Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-118Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:218-118 6.50-029-21493-01-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11909 11683 8913 9808 None 11683 8384 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 34 - 114 34 - 114 1490 470 Surface 2487 13-3/8" 33 - 2521 33 - 2520 3450 / 5380 1950 / 2670 Intermediate 10294 9-5/8" 31 - 10326 31 - 8830 6870 4760 Liner 7664 7"x5-1/2"x4-1/2" 2326 - 9989 2326 - 8537 7240/7740/8430 5410/6280/7500 Liner 242 7" 10119 - 10361 8649 - 8861 8160 7020 Perforation Depth: Measured depth: 10435 - 11866 feet True vertical depth:8923 - 8847 feet Tubing (size, grade, measured and true vertical depth)5-1/2" 17# x 4-1/2" 12.6#, 13CU/30 - 10150 30 - 8676 9808 8384Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Perm Packer Liner 2035 3-1/2"x3-1/4"x2-7/9874 - 11909 8440 - 8832 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2881527317358 51 63 1 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Richards, Meredyth Meredyth.Richards@bp.com Authorized Name:Richards, Meredyth Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075644867 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8832 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028332 PBU 16-20A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Meredyth Richards Digitally signed by Meredyth Richards Date: 2020.04.16 07:58:21 -08'00' By Samantha Carlisle at 8:41 am, Apr 16, 2020 RBDMS HEW 4/16/2020 SFD 4/23/2020MGR24APR20DSR-4/16/2020 ACTIVITYDATE SUMMARY 3/9/2020 ***WELL S/I ON ARRIVAL***)perforating) BRUSH & FLUSH W/ BLB & 3.80'' GAUGE RING, TAG DEPLOYMENT SLEEVE AT 9844' SLM. BRUSH & FLUSH W/ BLB AND 2.0'' GAUGE RING FROM DEPLOYMENT SLEEVE TO DEVIATION/DOGLEG AT 10,553' SLM. LRS PUMPED A TOTAL OF 135bbls CRUDE DRIFT W/ 30' x 2.00" DUMMY GUN TO 10,385' SLM (~30* doglegs) DRIFT W/ 20' x 2,00" DUMMY GUN TO 10,503' SLM ***WELL S/I ON DEPARTURE*** 3/19/2020 ***WELL SHUT IN ON ARRIVAL*** MIRU ELINE ATTEMPT TO PERFORATE BUT UNABLE TO MAKE IT TO DEPTH. ***JOB CONTINUES ON 20-MAR-20 WSR*** 3/21/2020 ***JOB CONTINUES FROM 20-MAR-20 WSR***(adperf) PERFORATE FROM 10,497' - 10,505' (REFERENCE DEPTHS: 10492' - 10500') WITH 1.56", 6SPF, 60 DEG, HSC, PERFECTA GUNS. CORRELATED TO BAKER COILTRACK GR/RESISTIVITY DATED 10-MAR-2019 ***JOB CONTINUES ON 22-MAR-20 WSR*** 3/22/2020 ***JOB CONTINUES FROM 21-MAR-20 WSR***(adperf) PERFORATE 10,440' - 10,450' (REFERENCE DEPTHS: 10435' - 10445') AND 10,477' - 10,497' (REFERENCE DEPTHS: 10472' - 10492') WITH 1.56", 6SPF, 60 PHASE, HSC, PERFECTA PERF GUNS CORRELATED TO BAKER COILTRACK GR/RESISTIVITY DATED 10-MAR-2019 ***JOB COMPLETE, WELL SHUT IN ON DEPARTURE*** Daily Report of Well Operations PBU 16-20A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS i 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing❑ -"'t Change Approved "f7 Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set CIBP 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ I 5. Permit to Drill Number: 218-118 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 1 Stratigraphic ❑ Service 1 6. API Number: 50-029-21493-01-00 7. Property Designation (Lease Number): ADL 08332 8. Well Name and Number: PBU 16-20A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 11909 feet Plugs measured 11683 feet true vertical 8832 feet Junk measured None feet Effective Depth: measured 11683 feet Packer measured 9808 feet true vertical 8913 feet Packer true vertical 8384 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 34-114 34-114 1490 470 Surface 2487 13-3/8" 33-2521 33-2520 3450 / 5380 1950 / 2670 Intermediate 10294 9-5/8" 31-10326 31-8830 6870 4760 Liner 7654 7" x 5-1/2" x 4-112" 2326-9989 2326-8537 7240 / 7740 / 8430 5410 16280 / 7500 Liner 242 7" 10119 - 10361 8649-8861 8160 7020 Liner 2035 3-1/2" x 3-1/4" x 2-7/8" 9874-11909 8440-8832 10160 10530 Perforation Depth: Measured depth: 11473. 11866 feet True vertical depth: 8973 - 8847 feet Tubing (size, grade, measured and true vertical depth) 5-1/2" 27# x 4-1/2" 12.6# 13Cr80 30-10150 30-8676 Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Penn Packer 9808 8384 No SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mct Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 50 0 3828 1625 277 Subsequentto operation: No test available 14.Attachments:(Mquimdper20MC25.07025.071, a25,283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Meredylh Richards Contact Name: Meredyth Richards Authorized Title: Petroleum Engineer Contact Email: Meredyth.Richards@bp.com �7 Authorized Signature: Date: Ii 3 I Contact Phone: +1 907 564 4867 Form 10-404 Revised 04/2017 (fMGq�Ne1:Tl Rte^' Submit Original Only If �11q RBDMS- SEP 2 5 2019 Daily Report of Well Operations 16-20A Ar.TI V ITvnATF CTU #8-1.75" Coil, 0.156"wt Job Objective: Set CIBP and AddPerf MIRU. Perform weekly BOP test. ...Continued on WSR 8-24-19.......... 8/23/2019 CTU#8 1.75" CT. ***Continue from 8/23/19 WSR*** Job Objective: Set CIBP and AddPerf Continue BOP Test. Swap out BOP's due to lower blind/shear ram failing. Perform Weekly BOP Test. MU & RIH W HES 2.2" Logging Carrier & 2.30" Nozzle. Bullhead 1% KCL w/ Safelube. Drift to TO and then log up to 9650', painting a hite tie in flag at 11630'. Confirm +5' correction and corrected PBTD of 11894.3'. Make up Baker 2 7/8" CIBP and RIH. 8/24/2019 ...Continued on WSR 8-25-19.... CTU#8 1.75" CT. ***Continue from 8/24/19 WSR*** Job Objective: Set CIBP and AddPerf RIH with Baker 2-7/8" CIBP and tie into flag. Set CIBP with ME at 11863' (Top of CIBP 11682.52'). Trim pipe. MU & RIH w/ Sib 2.0" x 31' PJ Omega Perf Gun #1. TagIBP & correct depth. �Puh and Perforate Interval 11504' - 11535'. Pooh. All shots fired, ball recovered. MU & RIH w/ Sib 2.0" x 31' PJ Omega Perf Gun #2—Ta—gtPP & correct depth. Puh and Perforate Interval 11473'- 11504'. POOH and FP Well. Begin Rig down CTU. --------- 8/25/2019 ...Continued on WSR 8-26-19.... CTU#8 1.75" CT. ***Continue from 8/25/19 WSR*** Job Objective: Set CIBP and AddPerf Rig Down CTU. 8/26/2019 ***Job Complete*** TRff= WELLHEAD = ACTUATOR= KB. ELEV = REF ELEV = BF. BEV = KOP= — I Max Angle = W= 10371' FVD= 8800'SS 5-12 TBG, 17#, 13CR-SO VAM TOP, 2228" .0232 bpf, E TIEBACK EXTENSION, D = 7 -5F71 --E2316' 13-3/B" CSG, 72#, L-80, D = 12.347" 2621' Minimum ID = 2.377" @ 10807' 3-3116" X 2-7/8" XO 4-12 TBG, 12.6#, 13CR-80 VAM TOP, 0152 bpf, D = 3.958" 7" SCAB LNR D = 3.58' L-80,.0232 ITOP OF 7" LNR -- 10119" 12.6#, L-80, .0152 bpf, D = 3.958' 10160' 9-5/8" CSG, 47#, L-80, D = 8.681" 10326' 3-12' LNR, 9.3#, 13CR-85 STL, �—I 10334' .0087 bpf, D = 2.992" 4-112" X 7" DELTA WHIPSTOCK (11120118) 7" LNR, 299, L-80, .0371 bpf, :K) = 6,184' 3-114' LNR, 6.6#, 13CR-85 TCM, .0079 bpf, D = 2.85" PERFORATION SUMMARY REF LOG: BHI GRIRES ON 03/10/19 ANGLE AT TOP PERF: G6'@ 11473' Note: Refarto Pm4uction DB for Nstorical rf SIZE SPF MERVAL NS z I -PERFSUMMARYONPG2- I2-7/8" LNR 6.5#, 13C R-85 STL, .0058 bpf, D = 2.441" A/ wA SAFETY NOTES: WELL ANGLE > 70' @ 10576'- 16-20A 0 MAX DLS: 39.4'@ 10879'- CHROME TBG & LNR ( 7" X 5-1/2" XO, D = 4.892" 5-112" FES X NP, D = 4.562" 5-12" X 4-112" XO, D = 3.958" BKR ZXP R(R w / FLX LOCK LNR FIGR D = 6.310" ST! MD TVD DEV TYPE j VLV LATCH PDR!! DATE 6 3245 3234 16 KB _ ' DOME BK i6 0321/19 515MO14903, 04/02/19 JNUJMD ADDED REF &BF ELEV 44 KBG-21 SO I BK 20 03/21/191 4 6654158791 DRLG HO CORRECTDNS 43 KBG2DMY BK 0 11103/181 3 7731167031 7530 38 KBG-2� DMY BK 0 03/21/041 103121/04 2 8766 1 35 KBG-21 DMY BK 0 1 9717 8308 34 KBG-2! DMY BK 0 03/21/041 9786' 9797' 7' X 4-1/2' BKR S-3 PROD PKR, D = 3.875" 9674' --1370"DEPLOYME4TSLE FE,D=3.00" 9904"4-12' HES X NP, N = 3.813" 5-1/2" PORTED XO !" X 4-112" XO, D = FESX NP, D=3 X5-112"XO, D= 12" BOTPBRASSY, D=? 518" X 5-1/2' BOT 3-H WR, D = MLLOUT E%TENSION_ D=?? � T UU4B- —1512" X 4-12" XO, D= 3.958" 10136' 4-12' OTIS XN NIP, D = 3725" ' -F710160'--F4-112' TUBING TAL, D = 3.958" 10141' EXM T7 LOGGED I2/t5/B6 10334 3-1/2" X 3-3116" XO, D = 2.786" 1 MLLOUT WINDOW (16-20A)1036V -10369' 10807' 1—� 3-3/16" X 2-7/B- XO, D = 2.377" 1 11683' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 12/31185 ROWAN 35 ORIGINAL COMPLETION 0325/19 JPK/JMD GLV C/O (0321/19) 07/13186 ?? RWO 04101/19 MS/JMD PERFS 0321104 N4E5 RWO 04/02/19 JNUJMD ADDED REF &BF ELEV 03M3M9 N-CDR2 CTOST(16-20A) 0828/19 TFA/JMD SETCMTP&ADPERFS 03/14/19 JMD DRLG HO CORRECTDNS 0321/19 TWJMD FINAL ODE APPROVAL PRUDHOE BAYUNR WELL: 16-20A PERMIT No: 218-118 API No: 50-029-21493-01 ON, R75E, 2170.11' FEL & 251 SP Exploration (Alaska) PERFORATION SUMMARY REF LOG: BHI GR/RES ON 03/10/19 ANGLE AT TOP PERF: 96° @ 11473' Note: Refer to Production DB for tistOrical erfdata SIZE SPF PfTERVAL Oprisciz DATE 2" 6 11473-11535 O 0825/19 2' 6 11550-11614 O 0328)19 2" 6 11627-11667 O 0327/19 2" 6 11695-11726 C 0327/19 2" 6 11738-11769 C 0326/19 2- 6 11785-11816 C 0326/19 2" 6 11835-11866 C 0326/19 16-20A SAFETY NOTES: WELL ANGLE > 70" @ 10576'. MAX DLS: 39.4' @ 10879'. CHROME TBG & LNR DATE REV BY COMMENTS DATE REVBY COMMENTS 12/J1/85 ROWAN35 ORIGINAL COMPLETION 0325/19 JPK/JMD GLV C/O (03r21119) 07113/86 ?? RWO 04/01/19 MS/JMD PERFS 0321!04 N4E5 RWO 04/02/19 JNUJMO ADDED REF & BF ELEV 03/13119 N-GOR2 CTDST(16-20A) 0828/19 TFA/JMD SET CBP&ADPERFS 03/14/19 JMD DRLG HO CORRECTIONS 0321/19 TH/.BAD FINAL ODE APPROVAL PRUDHOE BAYUNfr WELL: 16-20A PERMrr No: 218-118 API No: 50-029-21493-01 BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181180 Well Name/No. PRUDHOE BAY UNIT 16.20A MD 11909 TVD 8832 Completion Date 3/28/2019 REQUIRED INFORMATION Mud Log No I/ DATA INFORMATION List of Logs Obtained: MWD / GR / RES Well Log Information: Log/ Electr Data Digital Dataset Type Med/Fant Number Name ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data ED C 30573 Digital Data Operator BP Exploration (Alaska) Inc. API No. 50-029-21493-01-00 Completion Status 1-0I1- Current Status 1 -OIL UIC No Samples No Directional Survey Yes Log Log Run Scale Media No AOGC'C Pagel of2 (from Master Well Data/Logs) Interval OH / Start Stop CH Received Comments 9578 11909 4/10/2019 _ Electronic Data Set, Filename: 16- 20A_LW D_ FINAL_ FIELD—COMPOSITE-1 OMAR 2019 BHI CTK.Ias 4/10/2019 Electronic File: 16- 20A_GR_Res _ 10MAR2019_MD_FINAL_FIELD_ BHI_CTK.cgm 4/10/2019 Electronic File: 16- 20A_GR_Res 10MAR2019_TVDSS_FINAL_FIE LD_BHI_CTK.cgm 4/10/2019 Electronic File: 16- 20A—GR _ Res_ 10MAR2019_MD_FINAL_FIELD_ BHI_CTK.pdf 4/10/2019 Electronic File: 16- 20A_GR_Res _ 10MAR2019_TVDSS_FINAL_FIE LD_BHI_CTK.pdf 4/10/2019 Electronic File: 16-20A Field Final Survey.csv 4/10/2019 Electronic File: 16-20A Field Final Survey.xisx 4/10/2019 Electronic File: 16-20A Final Survey Report.pdf 4/10/2019 Electronic File: 16-20A Final Survey Report.txt 4/10/2019 Electronic File: 16- 20A_25_tapescan_BHI CTK.txt 4/10/2019 Electronic File: 16-20A_5_tapescan_BHI_CTK.txt 4/10/2019 Electronic File: 16-20A_output.tap 4/10/2019 Electronic File: 16- 20A_GR_Res _ 1oMAR2019_MD_FINAL_FIELD_ BHI CTK.tif Monday, July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181160 Well Name/No. PRUDHOE BAY UNIT 16-20A MD 11909 TVD 8832 Completion Date 3/28/2019 ED C 30573 Digital Data Log C 30573 Log Header Scans Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report G) Production Test Informatio Y NA Geologic Markersfrops O COMPLIANCE HISTORY Completion Date: 3/28/2019 Release Date: 10/10/2018 Description Comments: Interval Start Stop Operator BP Exploration (Alaska) Inc. API No. 50-029-21493-01-00 Completion Status 1 -OIL Current Status 1 -OIL UIC No 4/10/2019 Electronic File: 16- 20A_ GR_ Res_ 10MAR2019_TVDSS_FINAL_FIE LD_BHI_CTK.tbf 0 0 2181180 PRUDHOE BAY UNIT 16-20A LOG HEADERS Sample Set Sent Received Number Comments Directional / Inclination Data D Mud Logs, Image Files, Digital Data Y / l'% Core Chips Y / Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files n Core Photographs Y Daily Operations Summary (D Cuttings Samples Y / NA Laboratory Analyses Y N Compliance Reviewed By: Date Comments Date: —7 l 1 1 1 I AOGCC Page 2 of 2 Monday. July 1. 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISF'^N WELL' MPLETION OR RECOMPLETION REPO': AND LOG f1 A16.w a.B Y 1V111 APR 2 4 2019 la. Well Status: Oil m • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ Class/ /'o e'er 20AAC 25.105 20AAC 25.110 G1NJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One I1b.Well DevelOpm of ry Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 3/28/2019 218.118 3. Address: 7. Date Spudded: 15, API Number: P.O. Box 196612 Anchorage, AK 99519-6612 3/3/2019 50-029-21493-01-00 , 4a. Location of Well (Govemmental Section): 8. Date TO Reached: 16. Well Name and Number. 3/10/2019 PBU 16-20A ' Surface: 1447' FNL, 1216 FWL. Sec. 24, T10N, R15E, UM Top of Productive Interval: 2552' FSL, 3012' FVvi, Sec. 13, T1 ON. R1 5E. UM 9 Ref Elevations KB 70 GL 36.40 . BF 38.53 17. Field/Pool(s): PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 1950' FSL, 2064'M, Sec. 13, T10N, RISE, UM ' 11893'18837' ADL 028332 • 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 719993 . y- 5929504 • Zone - ASP 4 11909'/ 8832' 79-081 12. SSSV Depth (MD/TVD): PO Thickness of Permafrost MD/TVD: TPI: x- 721670 y- SOS3s� - Zone - ASP 4 963 Total Depth: x- 720740 y- 5932923 Zone - ASP 4 None 1675' (Appmx.) 5. Directional or Inclination Survey: Yes [Z (attached) No ❑ 13. Water Depth, if Offshore. 21. Re-drill/Lateral Top Wndow MD61' Submit electronic and printed information p per 20 AAC 25.050 N/A (ft MSL) 1 10361' / 8861' - 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23, CASING, LINER AND CEMENTING RECORD CASING Wr. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 34' 114' 34' 114' 30" 19259 Poleset 13-3/8" 68#172# K -5511-e0 33' 2521' 33' 2521' 17-1/2" 2300 sx CS III, 400 sx CS 1. 150 sx CS II 9-5/8" 47# L-90 31' 10326' 31' 8830' 12-1/4" 500 sx Class'G, 500 sx CS I 7"x5-1/2" X41/2" 26#/17# /126# L-110113crso 2326 10150' 2326' 8878' Scab Liner 10135 sx Class'G' 7" 29# 1-410 10119' 10361' 8649' 8861' 8-1/2" 300 sx Class'G' -1/2"X3-i/4" X2-7/8" 9.3#/6.6# /6.5# t3Gra5 9874' 11909' ' 88439' 8832' 4-1/4" 119 sx Class'G' 24. Open to production or injection? Yes ® • No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): GRADE DEPTH SET (MO) PACKER SET (MD/TV 5-1/2" 17# 13Cr80 9928' 9808-18384- 808'/8384'2" 2"Gun Diameter, 6 sof 3/26/2019 - 3/28/2019 x 4-1/2" 12.6# 13Cr80 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11550'- 11581 8958'-8949 11587- 11614' 8948'- 8938' Was hydraulic fracturing used during completion? Yes ❑ No IZ Per 20 AAC 25.283 (i)(2) attach electronic and printed 11636'- 1163 6' 8930' - 8930' COMPLETION 1163T- 11667' 8930' - 8919' DA-(,r-�- 11695'- 11726' 8909'- 8897'Zg tor 5 information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 11738'- 11769' 8892'- 8880' 11785'- 11816' 8875'- 8864' VERIFIE 11835'- 11866' 8858'- 8847' 2200' Freeze Protect w/ 50 BBIs 60/40 McOH 27. PRODUCTION TEST Date First Production: April 1. 2019 Method of Operation (Flowing, gas lift, etc): Gas Lift Date of Test: 4/8119 Hours Tested' Production for Oil -Bbl: Gas -MCF: Water -Bbl. Choke Sive Gas -Oil Ratio: 24 Test Period y66 26 5069 83 398 Flow Tubing 0 Press Casino Press: 1609 Calculated 24 Hour Rata �► Oil -Bbl: 66 Gas -MCF: 26 Water -Bbl: 5069 Oil Gravity-API(wm: N/A Forth 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only //?* �zoo"? gBDMS -L1v APR 2 5 2019 •-41- r -S /9 0 28. CORE DATA Conventional Cores) Yes ❑ No 0 ( Sidewall Cores Yes ❑ No 0 , If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 - Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 10320' 8825' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sadlerochit-Zone 4 10320' 8825' Kicked off from Parent (16-20) 10361' 8861' CGL - Zone 3 10467' 8947' Base of CGL - Zone 2 10580' 9005' Zone 3 (Invert) 10787' 9005' Zone 4 11540' 8960' Formation at total depth: Zone 4 (From Base) 11540' 8960' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Hyatt, Trevor Authorized Title: SIM Sp ali Contact Email: Trevor.Hyatt@bp.com Authorized Signature: ate: Contact Phone: +1 907 564 4627 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole wail design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item I a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this "it is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071_ Item 31. Pursuant to 20 AAC 25.070, attach to this forth: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only TRIM = 5-12 TBG, 17#, 13CR40 VAM TOP, .0232 bDf. D=4.892- 113-3/8" CSG. 72#. L-80. D = 12.347' I Minimum ID = 2.377" @ 10807' 33/16" X 2-7/8" XO 4-12 TBG, 12.6#, 13CR40 VA TOP, .0152 bpf, D = 3.958' r scab LNR � 9955. I MLL OUT OBSTRUCTION. D = 3.58" 1 5-12' TBG, 17#, L-80, .0232 bpf, D = 4.892" I SAFETY NOTES: WELL ANGLE> 70" 9Li 10576'. 16-20A MAX( :39A- @ 10879'. CHROME TBG & LNR zo' 7•xs12•xo,D=a.esr L9 -5B" CSG, 47#, L-80. D - 8.881 10326- 3-1/2' LNR 9.3#, 13CR-85 STL, 10334' .0087 bpf, D = 2.992' 14-112"X 7" DELTA V*IPSTOCK (1120/18) 7" LNR, 29#.7L-80,0371bpf,D4' 13-1/4" LNR, 6.69, ISCR-85 TCI, .0079 bpf, D = 2.85• 10807' PI3RFORATDN SLATMIRY REF LOG: BH GRRES ON 03/10/19 ANGLE AT TOP PERF 103" Q 11550' Note: Refer to production DB for historical pert data SIZE I SPF I NIH2VAL I Opn/Sgz 1 DATE_ -PERF SUNNARY ON PG 2- LNR 6.5#, 13CR-85 STL, .0058 15-12" X 4-12' XO, D =5-12" 4 D= 3.958- BKR ZXP PKR w / FLX LOCK LNR HGR D = 6.310- ST MU TVD DEV I TYPE VLV LATCH PORT DATE 6 3245 3234 16 111G-2 DOME BK 16 03!21/19 5 5330 4903 44 KBG-2 SO BK 20 03/21/19 4 6654 5879 43 KBG-2 DMY BK 0 11/03118 3 7731 6703 38 KBG-2 DW BK 0 0321104 2 8766 7530 35 KBG-2 01187' BK 0 0321/04 1 9717 8308 34 KBG-2 DMY BK 0 0321/04 1 9797' ��7' X 4-12' BKR S-3 PROD PKR D= 3.8 9874' 3.70• DEPLOYMENT SLff1/F- D= 3.00" 8904' 4-1/2" HES X NP, D = 3.813' 9918' 4-12' MLESFD� D = 3.958- 9922' rxs12•PORT®xo,D=a.esz" 9944' 5-12' X4-12" XO, ID = 3.958- 9956' 4-12' HBS X NP, D = 3.813" 8973' 4-12• x5-12' XO, D= 3.958• 8978' 9.s8'UNDLE OVF3ZSH07 10019' S-1/2"BOT PBR ASSY,D=? 10038' 9-5B' X 5-12' BOT 3-H PKR, D= 7 10043' 0321119 S' MLLOIIT IXTB4SDN, D=?? 10048' 5-12' X 4-12" XO, D = 3.958' 10138• 4-12'076 XN NP,D=3.725' 10160' 4-1/2"TUBING TAL, D=3.958" 10141' ELM Ti LOGGf3712/15/88 10334. 3-1/2' X 3-3/16• xo, D = 2.766" MLLOUT WINDOW (1&20A) 10361'- 10369' DATE REV BY COMTBdfS DATE REV BY COMoSdTS 12131/85 ROWAN 35 ORIGINAL COMPLETION 0325119 JPKIJMU GLV CIO(03/21/19) 07113/86 ?? RWO 04/01/19 MS/JMD PERFS 0321/04 WES RWO 04/02119 JNL/JMU ADDED FIEF &BF ELEV 03113/19 N -COM CTD ST (16-211A) 03/14/19 JI1U DRLG HO CORRFl; TI M 0321119 TWJMD FNALODEAPPROVAL 13-3116'X 2-7/8" XO. D = 2.377" 1 I PBTD PRUDHOE BAY UNIT WELL: 16-20A PERVIIT No: 218-118 API No: 50-029-21493-01 SEC 24, T10K R15E, 2170.11' FEL & 2515.77' FTL BP Exploration (Alaska) TREE= ^N WFiLFEAD= MCFVOY 1 —20A SAFET NOTES: WELL ANGLE>70'@10576'. MAX L :39.4° L8) 10879'. CHROME TBG & LNR ACTUATOR= V IB. F3FY = 70' Iiff BEV = 70' BF. F3_Fi/ = 38.53' KOP= 2900' Max Angie= 113-@11716' Datum MD= 10371' Datum TVD= 8800' SS F; FfKMTiON SUMMARY 03/14/19 REF LOG: BH GFIRES ON 03/10/19 ORLG Fp COFZF�CTIONS ANGLEATTOPPERF: 103° @ 11550' 0321/19 Nate: Rafer b P oductnn DB for h'sbrical pert data FNAL ODEAFiidOVAL SPF Kn3WAL Opn/SW DATE _SIZE' 2" 6 11550-11814 O 03/28/19 2" 6 11627-11667 03/27/19 2" 6 11695-11726 O 03/27/19 2' 6 11738-11769 O 03/26/19 2" 6 11785-11816 O 03/28/19 2' 6 11635 - 11866 0 03/26/19 fiiUDFIDE BAY t1MF DOTE Fel/ BY OOMM3JT5 DATE REV BY OOMu6JT5 WELL,L, 16-20A 12131185 RDWAN 35 ORIGINAL COMfM.ERON 0325119 JRGJMD GLV CIO (03/21/19) PEFW No: 218-118 07/13166 ?? RWO 04101/19 MS/JND P3�S AR No: 50-029-21493-01 03/21104 NOES RWO 04/09J19 JNJJMD AfJO®Rff&BF AEV SFC 24, T10K R15F 2170.11' FEL & 2515.77' FN - 03/13/19 t4CfXt2 CTD ST (16.20A) BP Exploration (Alaska) Datum MD= 10371' SS 03/14/19 JMJ ORLG Fp COFZF�CTIONS 0321/19 l}YJMD FNAL ODEAFiidOVAL North America - ALASKA - BP Operation Summary Report Page 1 of 14 Common Weil Name: 16-20 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/3/2019 End Date. 3/10/2019 X3 -0198C -C: (1,550,392.20) Project: PBU Site: 16 Rig Name/No.. CDR -2 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations ._ __ _ (hr) _ (usft)_ _ 3/3/2019 02:00 - 0430 2.50 RIGD P PRE PREP RIG TO MOVE OFF 9-05 HOLD A PJSM WITH PEAK AND RIG CREW TO MOVE OFF 9-05 - DISCUSS SPOTTER POSITIONS -STOP COMMAND - STOP BLOCK IN PLACE - ALL TREE & CASING VALVES CLOSED (IA 8 OA PSI = 0 PSI ON BOTH) - NOTIFY DSO FOR MOVE OFF WELL MOVE RIG OFF WELL 04:30 - 0530 1.00 MOB P I PRE _ INSTALLJEEPS 05:30 - 06:00 0.50 MOB N PRE WO SECURITY, NEED 1 MORE 06:00 - 07:30, 1.50 MOB P PRE 2ND SECURITY ON LOCATION, MOVE TO DS16 NOTIFY DSO WE WILL BE BLOCKING ACCESS TO THEIR PADS NOTIFY P272 TO SUSPEND OPS WHILE WE _ ARE BLOCKING THE ACCESS ROAD TO DS16 07:30 - 08:00 0.50 MOB P PRE RIG ON DS16 HOLD A PJSM WITH PEAKAND RIG CREW TO MOVE OVER 16-20 - DISCUSS SPOTTER POSITIONS -STOP COMMAND - STOP BLOCK IN PLACE - ALL TREE & CASING VALVES CLOSED (IA & OA PSI = 0 PSI ON BOTH) - NOTIFY DSO FOR MOVE OVER WELL _ - MOVE RIG OVER WELL 08:00 - 09:30 1.50 MOB P PRE REMOVE JEEPS AND SPOT RIG AND PITS 09:30 - 19:00 9.50 MOB P PRE "'RIG SPOTTED AND ACCEPTED- - START RU OPS - GAVE PRE -SPUD TO BEARDS CREW AND RIG EVAC DRILLAT CREW CHANGE - CYCLE TREE VALVES THEN LTT M&S VALVES TO BREAK CONTAINMENT - MU MPL, NO TREE CAP AND NU BOPE _ -INSTALL INJECTOR. VERIFY CHECKLISTS 19:00 - 22:30 3.50 MOB P PRE FLUID PACK SYSTEM - FILL COIL WITH FRESHWATER. - PURGE ALL SURFACE LINES. - REVIEW STEPS TO CALIBRATE MICRO MOTIONS. - PERFORM SHELL TEST TO 3500# GOOD _ TEST 22:30 - 00:00 1.50 BOPSUR P PRE TEST BOPS AS PER AOGCC AND BP REGULATIONS. 7-1/16" 5K STACK: ANNULAR, BLIND/SHEAR RAM, 2-3/8" PIPE/SLIP, 2-3/8" x 3-1/2" VARIABLE RAM, 2-3/8" PIPE/SLIP RAM AOGCC WITNESSED BY BRIAN BIXBY ALL TESTS TO 25013500 PSI. TEST 1: IRV, STRIPPER, C9, C10 BACKWARDS - PASS TEST 2: BLIND / SHEARS, RI,BOA, BI,B4- PASS Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths•' North America - ALASKA - BP Operation Summary Report Common Well Name. 16-20 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 3/3/2019 Site: 16 AFE No End Date 'ill 0/2019 X3 -0198C -C:(1,550,392.20) Page 2 of 14 Rig Name/No.: CDR -2 Spud DateTme: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) 6.00 Date From - To Him Task Code NPT Total Depth Phase Description of Operations --_.. (hr) _ (usft) 3/412019 00:00 - 04:30 4.50 BOPSUR P PRE REMOVE INJECTOR SIMOPS: BHI INSTALL FLOATS, PT TO 3500# -PASS TEST 3: ANNULAR (2-3/8"), TIWl, 63, B2, BLl - PASS TEST 4: UPPER P/S, TIW2, BL2, R2, T$ C15 - PASS TESTS: C16, T1, C11 -PASS TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 PASS TEST 7: LOWER 2-3/8" P/S, C5, C6, C8, TV1 - PASS TEST B: CHOKE A, CHOKE C - PASS CONDUCT DRAWDOWN TEST, WITNESSED BY TOOLPUSHER AND WSL AND AOGCC REP BRIAN BIXBY- PASS REMOVE BOP TEST JOINT AND INSTALL 0.9' SAVER SUB TO SPACE 3-1/2" SECTION ACROSS ANNULAR AND VERS. REINSTALL TEST JOINT. 04:30 - 06:00 1.50 RIGU P 06:00 - 12:00 6.00 RIGU P I TEST 9: ANNULAR (3-1/2"), Cl, C4. - PASS TEST 10: VARIABLES (3-1/2"), C2, C3 - PASS _ NO FAILURES PRE REMOVE AND LAY DOWN TEST JOINT REMOVE TEST RISERS / INSTALL DRILLING RISERS_ PRE MU TEST PLATE TO UOC PRESSURE TEST BOTH MUD PUMPS (OPENED FOR MAINT) AND THE UOC - GOOD PT, RD TEST PLATE - MU NOZZLE, STAB ONTO RISER, DISPLACE FW WITH 52 BBLS OF MUD FOLLOWED BY 3 BBLS OF FRESH WATER - COIL SWAPPED TO MUD WITH FW SPACERS AT THE LEAD AND TAIL - RU VC LUBRICATOR - GIVE PRE -SPUD AND HOLD RIG EVAC DRILL FOR BUSH'S CREW - HOLD A PJSM TO PULL TWC, REVIEW PROCEDURE AND VERIFY WHP FROM WHEN THE TWO WAS SET - FLUID PACK STACKAND LUBRICATOR WITH NEAT METH AND PT TO 3500 PSI - PULL TWO- 1900 PSI ON TUBING WHEN TWO WAS SET - TWO PULLED, 1989 PSI ON THE WELL - CLOSE SWAB TO VERIFY TWO IS ABOVE THE SWAB - MASTER VALVE IS LEAKING AND CREWS ARE ABOUT TO CHANGE OUT Printed 4/1/2019 11:24:54AM **All dephls reported in Drillers Depths" Common Well Name. 16-20 Event Type: RE-ENTER- ONSHORE (RON) Project: PBU _ Rio Name/No.: CDR -2 North America - ALASKA - BP Operation Summary Report AFE No Start Date. 3/3/2019 End Date. 3/10/2019 X3 -0198C -C.(1,550,392. 20) Site: 16 Active datum: Kelly Bushing / Rotary Table C70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth —__ _ _ -__ (hr) (usft) _ 12:00 - 1415 2.25 RIGU P 14:15 - 15:30 1.25 RIGU P 15:30 - 19:30 4.00 RIGU P 19:30 - 2000 0.50 20:00 - 23:30 3.50 RIGU P RIGU N Rig Release: 3/13/2019 Page 3 of 14 Phase Descnpfion of Operations PRE CREWCHANGE - HOLD A PJSM WITH DAY CREW TO SERVICE TREE VALVES AND LTT - SERVICE TREE VALVES i - 1965 PSI WHP, CLOSE SWAB AND MASTER, BLEED OFF LUBRICATOR - LUBRICATOR BLED OFF, CLOSE WHITEY VALVE AND VERIFY NO PRESSURE BUILD UP - SWAB TEST IS GOOD, CLOSE WHITEY VALVE AND OPEN SWAB AND BLEED OFF - BLED OFF TO 0 PSI, CLOSE SWAB AND MONITOR MPL FOR ANY PRESSURE BUILD UP - GOOD 10 MINUTE NO FLOW TEST - PREP TO BLOW DOWN - PU VC LUBRICAOTR, LD THE TWC AND LOAD OUT PRE SPT LUBRICATOR CONNECTION AND PREP TO BH KILL THE WELL - FLUID PACK STACK - MU THE INJECTOR TO THE LUBRICATOR - PT THE QTS CONNECTION - GOOD PT LINE UP TO PUMP DOWN THE MPL TO BH KILL THE WELL PRE BH KILL WELL, WHIP = 1960 PSI, AT 220 SPM OR 5.25 BPM - PUMP 5 BBLS NEAT METH - 290 BBLS 1% KCL -40 BBLS HI -VIS PILL -150 BBLS MUD -PUMP PRESSURE INCREASING AS HI -VIS PILL ENTERS THE PERFS -DOWN ON PUMPS SHUT DOWN PUMP AND CLOSE THE CHOKE - PENDING PRESSURE AT 540 PSI THEN DROPPED TO <20PSI - LINE UP TO PUMP DOWN THE COILAND PUMP REMAINING 3 BBLS OF WATER TO THE TT - CLOSE CHOKEAND OPEN BLEED LINE TO PURGE THE LUBRICATOR -RECORD LOSS RATE ACROSS TOP. INITIAL WAS 70 BPH. DISCUSS WITH ODE / SUPT. LOSS RATE DOWN TO 35 BPH. - FLOW CHECK FOR 10 MIN. PJSM FOR BHA MAKEUP_.__ PRE MAKE UP BHA. STAB INJECTOR. TEST TOOL. NO COMMS WITH BHA. FILL HOLE, POP OFF WELL. TEST UQC. NO CONTINUITY. HANG BHA ON PDL WINCHS PRE TROUBLESHOOT UQC -PULL FLOW SUB. TEST WIRE. NO CONTINUITY. TROUBLESHOOT REEL -LEADS REVERSED IN INTERCONNECT, PUT UQC BACK TOGETHER AND TEST. PT UQC TO 3500# Printed 4/1/2019 11:24:54AM **Al dephts reported in Drillers Depths" Common Well Name'. 16-20 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Operation Summary Report Start Date: 313/2019 End Date. 3/10/2019 AFE No X3 -0198C -C'. (1,550,392.20 ) Page 4 of 14 Project: PBU Site: 16 ----VERIFY TORQUE ON SADDLE BOLT CLAMPS 03:00 - 04:00 1.00 STWHIP P 10,361.00 Rig Name/No.: CDR -2 j Spud Date rims: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor NABORS ALASKA DRILLING INC. DISCUSS TO MOVE FORWARD MILLING WINDOW BPUOI: USA00001931 Active datum. Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) CLOSE DRILLING CHOKE. SQUEEZE PILL Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _- (hr) (usft) - MUD WEIGHT: 8.70 PPG IN, 8.70 PPG OUT 1 Y 23:30 - 00:00 0.50 STWHIP P _ -CIRC PRESSURE: 2625 PSI WEXIT _ MAKE UP 3.80" WINDOW MILLING BHA#1 REP SUCTION POD ON PUMP 1 LEAKING. SWAP - PICK UP 2-718" XTREME MOTOR TO ONE PUMP - RATE: 2.65 BPM IN, 1.85 BPM OUT - MAKE UP 3.79" STRING REAMER, 3.80" - DWOB: 1.55 KLBS - CIRC PRESSURE: 2402 PSI WINDOW MILL WEXIT LOST PUMP#1, HP FLUID END HASA CRACK AND NEEDS TO BE REPLACED I - SURFACE TESTED TOOL. GOOD TEST. - PU OFF BOTTOM AND CIRCULATE ACROSS THE TOP TO KEEP THE HOLE FULL. CALL - PRESSURE TEST QTS TO 250 PSI LOW FOR OUT LRS TO PROVIDE A BACKUP PUMP TO CONTINUE OPS WHILE PUMP IS REPAIRED 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES PLAN FOWARD _- INJECTOR ON: 23: 25 3/5/2019 00:00 - 02:30 2.50 STWHIP P 9,812.00 WEXIT RIH WITH WINDOW MILLING BHA#1 TO THEM THAT THEY NEED TO TAKE THEIR TIME SWAPPING OUT THE BLOCK 00 NOT - RATE: 0.77 BPM IN, 0.23 BPM OUT. CIRC GET IN A RUSH, FOLLOW THE PROCEDURE TO THE LETTER FOR THE REPAIR AND GET PRESSURE: 981 PSI '-MUD WEIGHT: 8.71 PPG IN, 8.69 PPG OUT LOSING -60 BPH - LOG DOWN FOR TIE-IN FROM 9660' TO 9781' MD (FORMATION) WITH-4_COR_RECTION 02:30 - 03:00 0.50 STWHIP P 9,812.00 WEXIT _ ' CHECK SADDLE CLAMP BOLTS ON REEL Printed 4/1/2019 11:24:54AM "AII dephts reported in Drillers Depths" -LO/ TO INJECTOR AND REEL. VERIFYLO ----VERIFY TORQUE ON SADDLE BOLT CLAMPS 03:00 - 04:00 1.00 STWHIP P 10,361.00 WEXIT RIHANDTAGAT10361'STACK6K. 6DEEP. DISCUSS WITH ODE AND TOWN GEO. DISCUSS TO MOVE FORWARD MILLING WINDOW LOAD 25 BBLS OF 180K _SRV HIVIS PILL CLOSE DRILLING CHOKE. SQUEEZE PILL INTO PERFS_ 04:00 - 05:00 1.00 STWHIP P 10,361.00 _ WEXIT MILL 3.80' WINDOW IN 7" LINER PER BAKER w - ` REP FROM 10361' MD /1� ©ll/•`�) ✓ -RATE: 2.80 BPM IN, 1.84 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.70 PPG OUT 1 Y - DWOB: 1.22 KLBS _ -CIRC PRESSURE: 2625 PSI 05:00 - 06:00 1.00 STWHIP P 10,362.00 _ WEXIT MILL 3.80" WINDOW IN 7" LINER PER BAKER REP SUCTION POD ON PUMP 1 LEAKING. SWAP TO ONE PUMP - RATE: 2.65 BPM IN, 1.85 BPM OUT - MUD WEIGHT: 8.74 PPG IN, 8.65 PPG OUT - DWOB: 1.55 KLBS - CIRC PRESSURE: 2402 PSI 06:00 - 09:00 3.00 STWHIP IN 10,363.14 WEXIT LOST PUMP#1, HP FLUID END HASA CRACK AND NEEDS TO BE REPLACED - CALL WSUPTAND DISCUSS - PU OFF BOTTOM AND CIRCULATE ACROSS THE TOP TO KEEP THE HOLE FULL. CALL OUT LRS TO PROVIDE A BACKUP PUMP TO CONTINUE OPS WHILE PUMP IS REPAIRED - HOLD PJSM WITH CREW TO DISCUSS PLAN FOWARD - LINE UPACROSS THE TOPAND KEEP HOLE FULL WHILE WO BACKUP PUMP - TALKED TO THE CREW MEMBERS THAT WILL BE DOING THE REPAIR AND STRESSED TO THEM THAT THEY NEED TO TAKE THEIR TIME SWAPPING OUT THE BLOCK 00 NOT GET IN A RUSH, FOLLOW THE PROCEDURE TO THE LETTER FOR THE REPAIR AND GET EXTRA HELP IF YOU NEED IT. Printed 4/1/2019 11:24:54AM "AII dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 5 of 14 Common Well Name: 16-20 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/3/2019 End Date: 3/10/2019 X3 -0198C -C: (1,550,392.20 ) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table Q70.00usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) - (usR) 09:00 13:00 4.00 STWHIP P 10,363.14 WEXIT LRS RU AND PRESSURE TESTED, RIH TO CONTINUE MILLING THE WINDOW - WORK DOWN AT 0.1' INCRIMENTS TO MOTOR WORK THEN RESTART MILLING - MOTOR WORK STARTING AT 10363' - RATE: 2.72 BPM IN, 2.03 BPM OUT - MUD WEIGHT: 8.74 PPG IN, 8.65 PPG OUT -DWOB: 2.19 KLBS -CIRC PRESSURE: 2564 PSI - PUMP A25 BBL 180K HVP - PILL AT THE MILL CLOSE CHOKE A LITTLE TO SQUEEZE INTO PERFS - WOB SLOWLY DROPPING OFF STARTING AT 10365.5', DOWN TO 600-700_# 13.00 - 1890 5.00 STWHIP P 10,382.50 WEXIT PUMP#1 READYTOGO,PUOFFTHE WINDOW - PT PUMP - GOOD PT, ONLINE WITH BOT PUMPS, RELEASE LRS - RIH AND CONTINUE MILLING WINDOW - VIBRATION IN THE 4-5's - RATE: 2.82 BPM IN, 2.49 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.64 PPG OUT - OWOB: 2.19 KLBS - CIRC PRESSURE: 2567 PSI - NOT SEEING MUCH WOB OR DIFF PRESSURE, CONTINUE MILLING AT 1 FPH TO 10370.5' STRING REAMER AT THE BOTTOM OF THE WINDOW - WS TRAY = 13.8'- 5.33' TO PINCH POINT = 8.4T WINDOW - 10369.54' VIBRATION STARTING TO FALL OFF AT THE CALCULATED BOTTOM OF THE WINDOW - HOLD A PJSM TO MU THE BUILD BHA AND HANG IT FOR THE NEXT RUN - MILL 10' OF RAT HOLE TO 10381 - RAT HOLE MILLED, PU AND START REAMING PASSES - DRY DRIFT WINDOW. - PAINT FLAG FOR BOTTOM OF RATHOLE (10260.26 EDP)____ 1800 - 21:00 3.00 STWHIP P 10,382.50 WEXIT MONITOR WELL FOR 10 MINUTES: LOSSES - MUD WEIGHT: 8.71 PPG IN, 8.56 PPG OUT - RATE: 2.87 BPM IN, 2.74 BPM OUT - OPEN EDC - RATE. 2.99 BPM. CIRC PRESSURE: 2247 PSI T- 21:00 - 22:00 1.00 STWHIP I P 10,382.50 WEXIT LD BHA: MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC, POWER DOWN - INJECTOR OFF: 21:20 - 3.80" GO / 3.79" NOGO ON WINDOW MILL. REAMER 3.79' GO 13,78" NOGO Printed 4/12019 11:24:54AM **All dephts reported in Drillers Depths" North America - ALASKA - 13P Operation Summary Report Page 6 of 14 Common Well Name'. 16-20 -PICKUP 2-7/8" ULS MOTOR (3.17 DEG AKO) AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/3/2019 End Date. 3/10/2019 X3 -0198C -C: (1,550,392.20) Project: PBU Site: 16 - SURFACE TESTED TOOL. GOOD TEST. Rig Name/No.: CDR -2 Spud Daterrime: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. - INJECTOR ON: 22:30 BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) - RATE: 1.13 BPM IN, 1.43 BPM OUT. CIRC Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ (uslt) 3/6/2019 - 02:30 22:00 - 22:45 0.75 DRILL P 10,382.50 PROD? MAKE UP 4-1/4"BUILD BHA#2 10:00 - 11.30 1.50 DRILL N -DYNAMIC FLOW CHECK WELLAND POOH - 100' FROM SURFACE, JOG IN HOLE THEN _FLOW CHECK WELL 10,401.00 PROD1 GOOD NO FLOW -TAG UP - REMOVE THE INJECTOR (OFFAT 10:30) - PULL BHA, BIT IS BALLED UP GRADE = 1:1 - RERUN BHA - STAB ON (INJECTOR ON AT 11:15) - PT THE OTS Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths" -PICKUP 2-7/8" ULS MOTOR (3.17 DEG AKO) AND 3.0" COILTRAK TOOLS -MAKEUP HYCALOG4-1/4"SRFX3611M-B4 BICENTER BIT - SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 22:30 22:45 - 00:00 1.25 DRILL _ P 10,382.50 PRODi RIH WITH 4-1/4" BUILD BHA#2 - RATE: 1.13 BPM IN, 1.43 BPM OUT. CIRC PRESSURE: 1033 PSI 100:00 -MUD WEIGHT: 8.62 PPG IN_8.6.0_PPG OUT 3/6/2019 - 02:30 2.50 DRILL P 10,382.50 PROD1 RIH WITH 4-114" BUILD BHA #2 - RATE: 1.13 BPM IN, 1.43 BPM OUT. CIRC 'PRESSURE: 1033 PSI -- MUD WEIGHT: 8.62 PPG IN, 8.60 PPG OUT - LOG DOWN FOR TIE-IN FROM 9615' TO 9725' MD (FORMATION) WITH -6' CORRECTION _ SET DOWN IN X -NIPPLES. 02:30 - 05:00 2.50 DRILL _ P 10,401.00 PRODi DRILL4.25" BUILD FROM 10382'MD TO 10385 - FREE SPIN: 2567 PSI, 2.85 BPM - RATE: 2.85 BPM IN, 2.42 BPM OUT. CIRC ,PRESSURE: 2577-2640 PSI - MUD WEIGHT: 8.69 PPG IN, 8.59 PPG OUT, ECD: 9.67 PPG - HAVING HARD TIME GETTING DRILLING FROM RATHOLE. HAVING TO WORK TO GET DRILLING BETWEEN 11382' AND 11385'. TAKINGALOT OF WEIGHT 3.5ASK 05:00 - 07:15 2.25 �! DRILL P 10,401.00 PROD1 NOTABLE TO MAKE PROGRESS PAST 10402', PU AND SET DOWN MAX WOB WITH ONLY 100 PSI DIFFERENTIAL PRESSURE. PUMP 5X5 LHVP'S AND CALL ODE TO DISCUSS - PUMP 5X5 PILLS OUT AND ABOVE THE BHA, CLOSE EDC AND DRIFT TO TO - DRIFT TO TD IS CLEAN, PU TO UPWT+2' AND STOP, VERIFY ORIENTSATION OF 80' LOHS, BRING PUMPS TO FULL RATE -4.2K WOB, MINIMAL MOTOR WORKACTS LIKE THE BIT IS BALLED UP, HOLD 4K WOB AND SEE IF IT WILL PUSH THROUGH AND CLEAN UP - MADE A LITTLE HOLE BUT THE THEIR COULD BE SOME DAMAGED PILOT CUTTERS ON THE BIT. DD IS CONCERED WITH GETTING THE BUILD AND TURN HE NEEDS AND WE ARE 70'AWAY FROM GETTING CLEAN SURVEYS CALL ODE AND DISCUSS 07:15 - 10:00 2.75f DRILL N 10,40100 PROD1 DECISION MADE TO POOH AND CHECK THE BIT 10:00 - 11.30 1.50 DRILL N -DYNAMIC FLOW CHECK WELLAND POOH - 100' FROM SURFACE, JOG IN HOLE THEN _FLOW CHECK WELL 10,401.00 PROD1 GOOD NO FLOW -TAG UP - REMOVE THE INJECTOR (OFFAT 10:30) - PULL BHA, BIT IS BALLED UP GRADE = 1:1 - RERUN BHA - STAB ON (INJECTOR ON AT 11:15) - PT THE OTS Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Page 7 of 14 Operation Summary Report Common Well Name: 16-20 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 3/3/2019 End Date: 3/10/2019 X3 -0198C -C (1,550,392.20) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud Daterrime: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor. NABORSALASKA DRILLING INC. BPUOL USA00001931 Active datum: Kelly Bushing / Rotary Table @70,00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) - _ (usft) 11:30 - 14:30 3.00 DRILL N 10,401.00 PROD1 GOOD PT, RIH RIH WITH 4.25° DRILLING BHA#3 - RATE: 0.54 BPM IN, 0.75 BPM OUT. CIRC PRESSURE: 970 PSI �- MUD WEIGHT: 8.59 PPG IN, 8.56 PPG OUT - LOG DOWN FOR TIE-IN FROM 9680' WITH +1'CORRECTION CONTINUE RIH, TAG AT 12 TIMES. PICK UP AND ORIENT. OUT MM DENSITY GOES TO 7.68 PPG FOR A SHORT TIME. PERFORM PUMPS OFF FLOW CHECK, GOOD, NO FLOW. 0 LEL READINGS. RESUME CIRCULATION, EASE DOWN AND TRY TO PASS AT 180L TF, CAN'T PASS. PICK UP AND TURN ORIENTOR CONTINUOUSLY, TRY TO PASS AT 1 FT/MIN, CANT PASS. PICK UP SLIGHTLYAND TURN ORIENTOR ALL THE WAYAROUND IN BOTH DIRECTIONS WITH 25K DWOB, POP THROUGH AT 140L. 1430 - 1620 1.83 DRILL N 10,401.00 PRODi CONTINUE RIH. TAG AT 9915', PICK UP AND TRY AGAIN, CAN'T PASS. PUT 3.5K DWOB AND TURN ORIENTER, POP THROUGHAT40L. CONTINUE RIH, TAG AT 9958' j PUT 3.4K ON DWOB AND ROLL ORIENTOR, POP THROUGH AT 20L. CONTINUE RIH, TAG AT 10125'. PICK UPAND SET DOWN 3K DWOB AND ROLL ORIENTOR IN EACH DIRECTION, CAN'T PASS. PICK UP AND CLOSE EDC, PUMP 0.4 BPM THROUGH BITAND EASE PAST 10125' AT 180L, 25 FT/MIN, 0.4 BPM. SLIGHT WEIGHT BOBBLE AT 10140', POP THROUGH. PASS THROUGH WINDOW AT 30L, 18 FT/MIN, 0 PUMP NO ISSUES 16:20 - 18:30 2.17 DRILL P 10,472.00 PROD1 DRILL 4.25"BUILD FROM 10414'MD TO 10472' - FREE SPIN: 2450 PSI, 2.77 BPM - RATE: 2.76 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 2450-2700 PSI - MUD WEIGHT: 8.66 PPG IN, 8.58 PPG OUT, ECD: 9.64 PPG - ROP: 40-70 FT/HR, WOB: 1-3 KLBS 18:30 - 20:30 2.00 DRILL P 10,553.00 PROD1 DRILL 4.25"BUILD FROM 10472'MD TO 10553' MD - FREE SPIN: 2720 PSI, 2.97 BPM - RATE: 2.97 BPM IN, 2.89 BPM OUT. CIRC PRESSURE: 2718-2979 PSI - MUD WEIGHT: 8.66 PPG IN, 8.59 PPG OUT, ECD: 9.80 PPG - ROP: 40 - 70 FT/HR, WOB. 2-3 KLBS -DLSCOMINGAT30°. WIPER. DROPRATE 20:30 - 22:30 2.00 DRILL P 10,646.00 PRODt DRILL4.25" BUILD FROM 10553' MD TO 10646' - FREE SPIN: 2466 PSI, 2.69 BPM - RATE: 2.69 BPM IN, 2.65 BPM OUT, CIRC PRESSURE: 2466- PSI - MUD WEIGHT: 8.67 PPG IN, 8.62 PPG OUT, ECD: 9.80 PPG - ROP: 40 FT/HR, WOB: 2-3 KLBS Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 14 Common Well Name: 16-20 - FREE SPIN: 2466 PSI, 2.69 BPM AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 3/3/2019 Entl Date: 3/10/2019 X3 -0198C -C: (1,550,392.20 ) Project: PBU - Site: --- - MUD WEIGHT: 8.67 PPG IN, 8.62 PPG OUT, Rig Name/No.: CDR -2 Spud Daterrime: 12/11/1985 12:00:00AM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. -ROP: 40 FT/HR, WOB: 2-3 KLBS BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usfl (above Mean Sea Level) _. _ _ _ Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ (Usft) 22:30 - 00:00 1.50 DRILL P 10663.00 PROD1 DRILL 425'BUILD FROM 10646'TO 10663' 11:24:54AM **Al dephts reported in Drillers Depths" - FREE SPIN: 2466 PSI, 2.69 BPM - RATE: 2.69 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 2466- PSI - MUD WEIGHT: 8.67 PPG IN, 8.62 PPG OUT, ECD: 9.80 PPG -ROP: 40 FT/HR, WOB: 2-3 KLBS - PUMPED 10 BBLS LOVIS / 10 BELS HIVIS _. _ _ _ -PERFORM200'WIPER. 3!7/2019 00:00 - 02:30 2.50 DRILL P 10,756.00 PROD? I DRILL 4.25" BUILD FROM 10663' TO 10756' - FREE SPIN: 2814 PSI, 2.85 BPM '- RATE: 2.84 BPM IN, 2.71 BPM OUT. CIRC PRESSURE: 2814-3036 PSI - MUD WEIGHT: 8.70 PPG IN, 8.63 PPG OUT, ECD: 10.0 PPG AT WINDOW - ROP: 15-60_FT_/H_R, WOB: 3A KLBS 02:30 - 04:00 1.50 DRILL P 10,817,00 PROD1 DRILL4.25" BUILD FROM 10663' 7010817' - FREE SPIN: 2885 PSI, 2.85 BPM - RATE: 2.85 BPM IN, 2.72 BPM OUT, CIRC PRESSURE: 2885-3106 PSI - MUD WEIGHT: 8.69 PPG IN, 8.67 PPG OUT, ECD: 10.0 PPG AT WINDOW _ _ - ROP: 15-60 FT/HR, WOB: 2-3.5 KLBS _ ___ 04:00 - 06:30 2.50 DRILL P 10,817.00 PROD1 DRILL4.25'BUILD FROM 10817'TO10935'. !i ;- FREE SPIN: 2885 PSI, 2.85 BPM I- RATE: 2.87 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 2885-3129 PSI - MUD WEIGHT: 8.71 PPG IN, 8.64 PPG OUT, ECD: 10.0 PPG AT WINDOW - ROP: 15-30 FT/HR, WOB: 2-3.5 KLBS - AT 10920' PUMP 5 BBLS LO / HI VIS SWEEPS 0630 - 0820 1.83 DRILL P 10,817.00 PROD1 DRILL TO TO OF BUILD, HAVE MET OBJECTIVES FOR THAT SECTION. DYNAMIC FLOW CHECK ON BOTTOM IS GOOD, LOSS OF 0.7 BBLS IN 10 MIN. WIPER TRIP TO WINDOW WHILE PREPARING PITS FOR 9.8# FLUID SWAP. PULL THROUGH WINDOW, CLEAN PASS. OPEN EDC. PUMP B/U AT 4.0 / 3.8 BPM UNTIL RETURNS CLEAN UP. 08'.20 - 1200'. 3.67 DRILL P 10,817.00 PRODI CLOSE EDC AND RIH THROUGH WINDOW20 FT/MIN, 30L, 0 PUMP NO ISSUES. LAY IN 9.8# MUD FROM TO. PULL THROUGH WINDOWAND OPEN EDC, PUMP 9.8# TO SURFACE FOLLOW 9.8# PRESSURE SCHEDULE. 1200 - 14'.20 2.33 DRILL P 10,817.00 PRO01 MONITOR WELL FOR 10 MINUTESAT BHA: STATIC FILL WELL WITH 0.5 BBLSAFTER FLOW CHECK, OPEN RISER AND INSPECT LAST 50' OF CT FOR FLAT SPOTS, NONE FOUND. - INJECTOR OFF: 12:15 - AT 12:30 FILL WELL WITH 2.8 BELS. - REBEND MOTOR TO 1.18 DEG. 11:24:54AM **Al dephts reported in Drillers Depths" North America - ALASKA - BP Page 9 of 14 Operation Summary Report Common Well Name: 16-20 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/3/2019 End Date: 3/10/2019 X3 -0198C -C. (1,550,392.20 ) Project: PBU Site: 16 Rig Name/No.: CDR -2 1 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Active datum: Kelly Bushing / Rotary Table @7 Date From - To Hm _ (hr) 14:20 - 17:30 3.17 117:30 - 18:50 1.33 18:50 - 22:30 3.67 22:30 - 00:00 1.50 (above Mean Sea Level) Task Code NPT Total Depth Phase Description of Operations (usft).. DRILL P 10,817el) _ _. _ _PROD1 PROD1 RIH WITH 4.25" DRILLING BRA #4 - RATE: 0.53 BPM IN, 0.16 BPM OUT. CIRC PRESSURE: 900 PSI - MUD WEIGHT: 9.73 PPG IN, 9.72 PPG OUT - LOG DOWN FOR TIE-IN FROM 9680' WITH +5' CORRECTION -PICK BACK UPAND LOG CCL ACROSS LINER iTOPAREA. DRILL P 10,817.00 PROW RIH TO BOTTOM. -CIRCULATE 9.8 PPG FLUID OUT LOST 84A �BBLS OF 9.8 PPG DRILL P 11,170.00 PRODt DRILL 4.25" LATERAL FROM 10935' TO 11170' - FREE SPIN: 2919 PSI, 2.71 BPM - RATE: 2.71 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 2919-3198 PSI - MUD WEIGHT: 8.76 PPG IN, 8.70 PPG OUT, ECD: 10.0 PPG AT WINDOW MAINTAIN 130# WELLHEAD ROP: 70-100 FT/HR, WOB: 2-3.5 KLBS DRILL P 11,260.00 _ PROD1 DRILL 4.25" LATERAL FROM 11170 TO 11260 - FREE SPIN: 3050 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.79 BPM OUT. CIRC PRESSURE: 3050 - 3448 PSI - MUD WEIGHT: 8.77 PPG IN, 8.74 PPG OUT, ECD' 100 PPG AT WINDOW MAINTAIN 130# WELLHEAD ROP: 70-100 FT/HR, WOB: 2-3.5 KLBS _ 3/8/2019 00:00 - 02:30 2.50 DRILL P 11,400.00 PROD1 DRILL 4.25° LATERAL FROM 11260- 11431' - FREE SPIN: 3106 PSI, 2.90 BPM - RATE 2 90 BPM IN 2 80 BPM OUT CIRC 0230 - 04:30 2.00 DRILL P� 04:30 - 05:00 0.50 DRILL P PRESSURE: 3106- 3389 PSI - MUD WEIGHT: 8.78 PPG IN, 8.72 PPG OUT, ECD: 10.0 PPG AT WINDOW MAINTAIN 130# WELLHEAD - ROP: 90 FT/HR, WOB: 2-3 KLBS - PERFORMING BHA WIPERS AS NEEDED - PUMP 10 BBLS LOVIS / 10 BBLS HIVIS 11,431.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 11431' MD TO 9680' RATE: 2.93 BPM IN, 2.64 BPM OUT. CIRC PRESSURE: 3179 PSI -PERFORM 100'JOGATWINDOW. PULL THROUGH WITHOUT ISSUE. TRAP 665 PSI ON CHOKE - OPEN EDC. ONLINE 4.41 BPM IN / 4.12 BPM OUT. WIPER UP 7O 9600' SUBSTANTIAL AMOUNT OF CUTTINGS COMING ACROSS. -CONTINUE TO PUMP AT HIGH RATE UNTIL SHAKER CLEANS UP, SHAKER CLEANED UP AFTER SECOND BOTTOMS UP. - LOG DOWN FOR TIE-IN FROM 9680' TO 9729' MO (FORMATION) WITH +4' CORRECTION _- RIH_TO WINDOW 11,431.00 PROD1 RIH THROUGH WINDOW WITHOUT ISSUE. - 0.49 BPM IN 10.57 BPM OUT - 8.71 PPG IN 18.69 PPG OUT -MAINTAINING 10.0 PPG ECD AT WINDOW 258 PSI ON CHOKE - BOBBLE AT 10665' Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 10 of 14 Common Well Name: 16-20 - 16:00 4.50 AFF No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/312019 End Date: 3/10/2019 X3 -0198C -C: (1,550,392,20) Project: PBU--- N 5.50 WELLHEAD Rig Namei CDR -2 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. 10,300.00 PRODI CHOKE PLUGGING OFFATA DEPTH OF BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) SEVERAL LARGE PIECES OF RUBBER COME Date From - To Him Task Code NPT Total Depth Phase Description of Operations - (hr) _ (hr) -_-. _. (usft) PULL WIPER TO WINDOW TO CIRC B/U. 05:00 - 09:00 4.00 DRILL P 11,431.00 PROD1 _ DRILL4.25' LATERALFROM 11431 -TO 11539' 09.00 - 11:30 2.50 DRILL N 11:30 - 16:00 4.50 DRILL P 16:00 21:30 - MUD WEIGHT: 8.76 PPG IN, 8.69 PPG OUT, DRILL N 5.50 21:30 - 00:00 2.50 DRILL P Printed 4/112019 11:24:54AM **All dephts reported in Drillers Depths- - FREE SPIN: 3273 PSI, 2.99 BPM - RATE: 2.99 BPM IN, 2.91 BPM OUT. CIRC PRESSURE: 3273-3595 PSI - MUD WEIGHT: 8.76 PPG IN, 8.69 PPG OUT, ECD: 10.0 PPG AT WINDOW MAINTAIN 1401t WELLHEAD - AT 11480' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. 10,300.00 PRODI CHOKE PLUGGING OFFATA DEPTH OF 11539'. SEVERAL LARGE PIECES OF RUBBER COME ACROSS SHAKER. BYPASS AND PURGE CHOKE AND OUT MM WITH AIR. PULL WIPER TO WINDOW TO CIRC B/U. 1 00'JOG BEFORE WINDOW THEN TRAP 10.1 PPG PRESSURE, OPEN EDC. PUMP B/U AT 3.9 / 3.9 BPM. PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. AFTER B/U SHUT IN WELL, TRAP 10.0 PPG. PURGE CHOKE AND OUT MM WITH AIR. _ _ RUN BACK TO BOTTOM WITH NO ISSUES. 11,599.00 PROD1 DRILL 4.25" LATERAL FROM 11539' TO 11599 - FREE SPIN: 3300 PSI, 2.86 BPM - RATE: 2.85 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3300-3427 PSI �- MUD WEIGHT: 8.77 PPG IN, 8.56 PPG OUT, ECD: 10.0 PPG AT WINDOW MAINTAIN 120# _. _WELLHEAD 11,599.00 PROD1 WHILE DRILLING PURGE OUT MM WITH AIR AGAIN. AFTER PURGING IT READS DENSITY ABOUT 0.2 PPG LOW COMPARED TO MUD BALANCE READINGS. DISCUSS WITH CTD SUPT, DECIDE TO PULL OFF BOTTOM AND KNOCK OFF ACCESS CAP, TRY TO CLEAR OUT MM TUBE WITH WIRE, NOTABLE TO. PULL BACK TO WINDOW, PUMP B/U. MAINTAIN BOTTOMHOLE ECD PUMPING AT 0.1 BPM. PULL MICROMOTION APART. RUBBER JAMMED IN MICROMOTION. RUN THROUGH ZERO VERIFICATION ON MICRO MOTION. LOG TIE IN +1.5' RUN BACK _ _ _ TO BOTTOM SET DOWN 10590' AND 10605' 11,589.00 PROD1 DRILL 4.25' LATERAL FROM 11599' - FREE SPIN: 3350 PSI, 2.96 BPM - RATE: 2.99 BPM IN, 2.91 BPM OUT, CIRC PRESSURE: 3350- 3448 PSI - MUD WEIGHT: 8.78 PPG IN, 8.59 PPG OUT, ECD: 10.2 PPG AT WINDOW MAINTAIN 0# WELLHEAD - ROP IN THE 12-15 FPH AND TAPERING OFF. BEGINNING TO HAVE TO STACK4.5-5K ON BIT TO GET ANY MOTOR WORK. GR IS SHOWING SAND. Printed 4/112019 11:24:54AM **All dephts reported in Drillers Depths- North America - ALASKA - BP Operation Summary Report Page 11 of 14 Common Well Name: 16-20 - RATE: 2.85 BPM IN, 2.85 BPM OUT, CIRC AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/3/2019 End Date: 3/10/2019 X3 -0198C -C'. (1,550,392.20) Project: PBD Site: 16 .-4.5 TO 5K WOB. MINIMAL MOTOR WORK Rig Nama/No.: CDR -2 Spud Daterrime: 12/11/1985 12:00 OOAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) DOWN AT 180° OUT FROM AS DRILLED. Date From - To Him Task Code NPT Total Depth Phase Description of Operations (h£)_ (usft) 3/9/2019 00:00 - 03:00 3.00 DRILL P 11,63700 PROD1 DRILL 41 LATERAL FROM 116317011837 AND THROUGH WINDOW - OPEN EDC TO POSSIBLY LIBERATE MORE - FREE SPIN: 3300 PSI, 2.86 BPM Printed 4/1/2019 11,24:54AM **All dephts reported in Drillers Depths" - RATE: 2.85 BPM IN, 2.85 BPM OUT, CIRC PRESSURE: 3300 - 3427 PSI I - MUD WEIGHT: 8.78 PPG IN, 8.55 PPG OUT, ECD: 10.0 PPG AT WINDOW MAINTAIN Op WELLHEAD .-4.5 TO 5K WOB. MINIMAL MOTOR WORK - BIT CONDITION IN QUESTION. POOH FOR BIT. - DYNAMIC FLOW CHECK. MINIMAL LOSSES - PULL THROUGH AREA WE KEEP SETTING DOWN AT 180° OUT FROM AS DRILLED. - START PULLING OUT TO WINDOW -AT10400' PULLED TIGHT AND STALLED MOTOR. COME OFFLINE. - RIH AND STACK SK ON BITAND POPPED FREE. RIHTO10550'. STACK6.6KDOWN AND STALL MOTOR., PICKUP AND PULL FREE AND THROUGH WINDOW - OPEN EDC TO POSSIBLY LIBERATE MORE RUBBER - NO RUBBER ON BOTTOMS UP. -CLOSE EDC. RIH TO BASE OF BUILD. NO SIGN OF WHAT WE WERE SETTING DOWN ON. SUSPECT MORE RUBBER FLOATED. 03:00 - 05.00 2.00 DRILL P 11,637.00 PROD1 _ POOH LAYING 9.8 PPG FROM BASE OF BUILD AT 10664' -2.05 BPM IN/1.44 BPM OUT -9.8 PPG IN /8.60 PPG OUT PULL TO WINDOW WITHOUT ISSUE. OPEN EDC.POOH 05:00 - 06.30 1.50 DRILL N 11,637.00 PROD1 OUT MM PLUGGING AGAIN - DENSITY ON OUT 0.8 PPG LOW TO ACTUAL MUD WEIGHT. -ATTEMPT TO BLOW BACK. NOLUCK. - PJSM, FOR SNAKING MM_ 06:30 - 08:00 150 DRILL P 11,637.00 PROD1 POOH TO SURFACE - OUT MM READING ABOUT 0.6 - 0.7 PPG LOW. STILL TRACKING UP AND DOWN WITH DIFFERENT FLUIDS, JUST READING LOW. - DISCUSS WITH CTD SUPT, AGREE ON RISK MITIGATIONS FOR TRIP OOH. - VERIFY ON SLIGHT LOSSES WHILE POOH USING PVT READINGS - VERIFY OUT DENSITY EVERY 1000' WITH MUD BALANCE - MUD WEIGHT: 9.7 PPG IN, 9.7 PPG OUT _ (MUD BALANCE READINGS) 08:00 - 08:30 0.50 DRILL P 11,637.00 PROD? L/D BHA - MONITOR WELL FOR 10 MINUTESAT BHA: STATIC - FILL WELL WITH 1.1 BBLS AFTER FLOW CHECK - INJECTOR OFF: 08:20 - OPEN RISER AND INSPECT LAST 50' OF CT. - REMOVE BIT, GRADED 3-2 - LOOK DOWN THE STACK, ANNULAR ELEMENT APPEARS OK, Printed 4/1/2019 11,24:54AM **All dephts reported in Drillers Depths" 10:00 North America - ALASKA - BP Page 12 of 14 10:30 Operation Summary Report 2.00 Common Well Name: 16-20 - 14:30 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/3/2019 End Date: 3/10/2019 X3-0198C-C. (1,550,392 20) Project: PBU - - Site: 16 Rig Name/No.: CDR-2 Spud Dae/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORSALASKA DRILLING INC. CORRECTLY. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table C70.00usR (above Mean Sea Level) DRILL N 11,637.00 Date From- To Him Task Code NPT Total Depth Phase Description of Operations -FILL WELL WITH 1-2 BBLS EVERY 30 MIN_. DRILL N 11,637.00 X08:30 - 10:00 1.50 DRILL N 11,637.00 PROD1 TROUBLESHOOT OUT MM. 10:00 - 1030 0.50 10:30 - 1230 2.00 1230 - 14:30 2.00 14:30 - 1500 0.50 15:00 - 19:00 4.00 19:00 - 20:30 1.50 -PUMP 9.7# FLUID ACROSS THE STACK AT 5.2 -RIH HOLE. SET DOWN AND POP THROUGH 10650' 20:30 - 00:00 3.50 DRILL P 11,690.00 PRODt DRILL 4-1/4"LATERAL FROM 11631'MD TO 11690' MD li - FREE SPIN: 3153 PSI, 3.00 BPM j - RATE: 2.97 BPM IN, 2.96 BPM OUT. CIRC PRESSURE: 3153-3463 PSI - MUD WEIGHT: 8.77 PPG IN, 8.77 PPG OUT, ECD: 10.3 PPG - ROP: 10-30 FT/HR, WOB: 2.5 —3.5 KLBS -42N SHALE DRILLING. Printed 4/12019 11:24:54AM **All dephts reported in Drillers Depths" BPM, READING 9.1#. -CLOSE SWAB AND PUMP FRESHWATER ACROSS TOP, READING 8.54#. -TROUBLESHOOT WITH HELP FROM EMERSON TECH IN TEXAS - SOURCE ANOTHER MM FROM CDR3. - FINISH TROUBLESHOOTING STEPS, OPEN SWABAND FILL WELL WITH 1.8 BBLS. - OUT MM IS STILL NOT READING CORRECTLY. BOPSUR P 11,637.00 PROD? FUNCTION TEST BOPS, ALL GOOD. DRILL N 11,637.00 PROD1 PREP FOR CHANGING OUT MM. - REMOVE OLD MM -FILL WELL WITH 1-2 BBLS EVERY 30 MIN_. DRILL N 11,637.00 PROD1 INSTALL NEW MM. -CONTINUE FILLING WELL WITH 1-2 BBLS EVERY 30 MIN -AFTER INSTALLING NEW MM TEST WITH FRESH WATER AND 9.7# MUD, DENSITY READING IS GOOD. - ISOLATE OUT MM AND ZERO METER FOR FLOW. DRILL P 11,637.00 PROD1 MAKEUP 4.25" DRILLING BHA#5 -PICK UP 2-7/8" ULS MOTOR If 18 DEG AKO) AND Y COILTRAK TOOLS - MAKE UP HYC BICENTER BIT - SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES INJECTOR ON: 15: 00 _ DRILL P 11,637.00 PROD1 RIH WITH 4.25" DRILLING BHA#5 - RATE: 0.90 BPM IN, 0.72 BPM OUT. CIRC PRESSURE: 1270 PSI - MUD WEIGHT: 8.78 PPG IN, 9.79 PPG OUT -LOG DOWN FOR TIE-IN FROM 9680'. CORRECTION IN QUESTION. LOG HIGHER. SIGNATURE COMING IN AT+87' CORRECTION. -INVESTIGATE. EDP PIPE COUNTER READING SAME AS BHI COUNTER. PULL UP HOLE TO VERIFY UPPER TIE IN MARKER, DRILL P 11,637.00 PROD? RIH TO 10340' -SET DOWN AND OVERPULL. PULLFREE. RUN BY. MORE TRASH FLOATING AROUND -RIH HOLE. SET DOWN AND POP THROUGH 10650' 20:30 - 00:00 3.50 DRILL P 11,690.00 PRODt DRILL 4-1/4"LATERAL FROM 11631'MD TO 11690' MD li - FREE SPIN: 3153 PSI, 3.00 BPM j - RATE: 2.97 BPM IN, 2.96 BPM OUT. CIRC PRESSURE: 3153-3463 PSI - MUD WEIGHT: 8.77 PPG IN, 8.77 PPG OUT, ECD: 10.3 PPG - ROP: 10-30 FT/HR, WOB: 2.5 —3.5 KLBS -42N SHALE DRILLING. Printed 4/12019 11:24:54AM **All dephts reported in Drillers Depths" Common Well Name: 16-20 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Page 13 of 14 Operation Summary Report AFE No Stan Date. 3/3/2019 End Date. 3110/2019 X3 -0198C -C:(1,550,392.20) Site: 16 _ -- nig rvamemo.: wn-z I spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr)- (usft) 3/10/2019 00:00 - 05:30 - _ 4.50 DRILL P 11,690.00 _ PROD1 DRILL 4-14LATERAL FROM 11690'MD TO 11908' - FREE SPIN: 3145 PSI, 3.00 BPM - RATE: 2.95 BPM IN, 2.90 BPM OUT, CIRC PRESSURE: 3145 - 3463 PSI -MUD WEIGHT: 8.81 PPG IN, 8.77 PPG OUT, 'ECD: 10.3 PPG -ROP: 10-30 FT/HR, WOB: 2.5-3.5 KLBS - DAYLIGHT SAVINGS TIME. JUMP IHR 'FORWARD. - CONTINUE TO DRILL FORWARD TOWARD 05:30 - 08:00 2.50 DRILL P 11,690.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW FROM 11908' MD - RATE: 2.95 BPM IN, 2.76 BPM OUT. CIRC PRESSURE: 3065 PSI - PERFORM 100' FTJOG BELOW WINDOW, PULLTHROUGH WITH NO ISSUES. - OPEN EDC - PUMP ANOTHER 10 BBLS LO / HI VIS SWEEPSAROUND -PUMP 2X B/U AT 3.5 BPM - TIE IN DEPTH AT 9680', CORRECT +31. - RUN BACK TO WINDOWAND CLOSE EDC. - RUN BACK TO BOTTOM, NO ISSUES. - TAG AT 119091, CORRECTED DRILLED DEPTH. 08:00 - 14:00 6.00 DRILL P 11,690.00 _ PROD1 WIPER TRIP TO SURFACE - PUMP 10 BBLS HI -VIS FROM BOTTOM. - PULL 100' JOG BELOW WINDOW THEN PULL THROUGH. - OPEN EDC, PUMP 3.96 / 3.72 BPM TO SURFACE. MAINTAIN 10.0 PPG AT WINDOW. 1400 - 17:00 3.00 DRILL P 11,909.00 PROD? RUN BACK IN HOLE TO LAY IN BEAD PILL - TAG STRIPPER AND ZERO DEPTH. - RIH PUMP 2.5 BPM MAINTAIN 10.0 PPG AT WINDOW. - TIE-IN DEPTH FROM 9680', THEN PICK UP AND TIE-IN FROM 9500'. CORRECT +79'. 17:00 - 1730 0.50 DRILL P 11,909.00 PROD1 CHANGE OUT DEPTH ENCODER. 17:30 23:00 5.50 DRILL P 11,909.00 PROD1 RIH TO TD AT MINIMUM RATE, NO ISSUES RUNNING IN HOLE LAY LINER BEAD PILL FOLLOWED BY 9.8 PPG FLUID FROM 10664' MD PULL THROUGH WINDOW WITHOUT ISSUE. OPEN EDC. PERFORM 10 MIN DYNAMIC FLOW CHECKAT 9.8 PPG EQUIVALENT - 0.46 BPM IN / 0.44 BPM OUT. - PULL UPHOLE. LOG TIE IN TO VERIFY ENCODER CHANGE.+1'CORRECTION. - PAINTYELLOW FLAG 9641.93' BIT DEPTH (9562.52' CORRECTED EOP) - PAINT WHITE FLAG 7990.45' BIT DEPTH (7911.04' CORRECTED EOP) - POOH WHILE LAYING 9.8 PPG FLUID IN. Printed 4/1/2019 11:24:54AM **All dephts reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Page 14 of 14 Common Well Name: 16-20 AFE No Event Type: RE-ENTER- ONSHORE (RON) Stan Date: 3/3/2019 End Date. 3/10/2019 X3 -0196C -C: (1,550,392.20 ) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P 11,909.00 PROD? _ 10 MIN FLOW CHECK. GOOD FLOW CHECK INJECTOR OFF: 23:15 INSPECT LAST 50' OF PIPE FOR CHROME .ABRASION. PIPE LOOKS GOOD. Panted 4/112019 11:24.54AM **All dephts reported in Drillers Depths** Printed 411/2019 11.25:44AM "All depths reported in Drillers Depths"' North America - ALASKA - BP Page 104 Operation Summary Report Common Well Name: 16-20 AFE No Event Type: COM -ONSHORE (CON) Start Date: 3/11/2019 Eno Date: 3/13/2019 X3 -0198C -C: (843,827.00) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud Date/Time: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations __ (hr) (usft) - 3/11/2019 00:00 - 05:00 5.00 CASING P 11,909.00 RUNPRD PREP FOR LINER - REMOVE UQC AND BOOT E -LINE - INSTALL (1) JOINT OF 2-3/8" BTS -6 - PUMP 250' OF POSSIBLE 310' AMOUNT OF • E -LINE OUT. - MAKE UP NOZZLE. REPLACE PACKOFFS. PRESSURE TEST 250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN EACH. - LOAD AND LAUNCH 7/8" DRIFT BALL. PUMP COIL VOLUME FORWARD. RECOVERED 7/6" BALL. - MAKE UP BOT X -OVER AND SWIVEL. - RU FLOOR FOR RUNNING LINER _ 05:00 - 11:30 6.50 CASING P 11,90900 RUNPRD WU LINER AS PER APPROVED TALLY. AFTER JOINT #35 CONDUCT D7 DRILL WITH WARD CREW. DRILLER ACTIVATES BOP ALARM, SAFETY JOINT IS BOUGHT TO RIG FLOOR AND LATCHED UP, TORQUED UP. DRILLER SHUTS IN PIPE / SLIP, FOSV, HCR (SIMULATED) ALL CREWS REPORT TO CORRECT -STATIONS. WELL IS SECURED IN 4 MIN. CONDUCTAAR AND DOCUMENT FINDINGS. CONTINUE M/U 2-7/8" X 3-1/4" X 3-1/2" LINER STRING. M/U SELRTAND DRILL COLLARS. DRIFT DRILL COLLARS WITH 1.45" DRIFTAS THEY ARE PICKED UP. LAST DRILL COLLAR WON'T DRIFT, APPEARS TO BE 1" to. LEAVE THIS ONE OUT, RUN B INSTEAD OF 7. UPDATE BHA INFORMATION. M/U SWIVELAND INJECTOR. TEST QTS TO 3500 PSI, GOOD. 11.30 - 1330 2.00 CASING P 11,909.00 RUNPRD RIH WITH 2 -7/8"X3 -1/4"X3-1/2" COMPLETION. - RATE: 0.52 BPM IN, 0.80 BPM OUT. CIRC PRESSURE: 886 PSI - MUD WEIGHT: 9.84 PPG IN, 9.85 PPG OUT - STOPAT FIRST FLAG, 10121' UNCORRECTED. NABORS EDP COUNTER READS 7914.8'. - CORRECT DEPTH +9' TO 101301. Printed 411/2019 11.25:44AM "All depths reported in Drillers Depths"' North America - ALASKA- BP Operation Summary Report Page 2 of 4 Common Well Name: 16-20 AFE No Event Type. COM- ONSHORE (CON) Start Date: 3/11/2019 End Date' 3/13/2019 X3 -0198C -C: (843,827.00 ) Project: PBU Site: 16 _ RUNPRD RIH WITH 2 -7/8'X3 -1/4"X3-1/2" Rig Name/No.: CDR -2 Spud Date/Time: 12/11/1985 12:00 XAM Rig Release: 3/13/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) - PASS THROUGH WINDOW WITH NO ISSUES, Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (Usft) 13:30 16:30 3.00 CASING P 11,909.00 _ RUNPRD RIH WITH 2 -7/8'X3 -1/4"X3-1/2" COMPLETION. -UP WEIGHTAT WINDOW IS 53K. - PASS THROUGH WINDOW WITH NO ISSUES, RIH WTABOUT25K. - ROLL BY 2ND FLAG, RIGHT ON DEPTH. - STACK DEPTH AT 11815', PICKUP IS CLEAN 58K. - START WORKING LINER DOWN FROM 11815'. - CAN'T PASS 11845AFTER 3 ATTEMPTS, SIT HERE AND CIRCULATE A FEW MINUTES, STILL CAN'T PASS. - PICK UP 30 FTAND RIH FASTER, CAN'T PASS. - SIT HERE AND CIRCULATE MORE, MIX SPACERS FOR MINERAL OIL. 16:30 - 1900'. 2.50 CASING P 11,909.00 RUNPRD FINISH RIH TO BOTTOM. - WITH 4 BBLS CLOUT, GO TO MIN RATE AND START WORKING PIPE. - WORK REMAINING DISTANCE TO BOTTOM, TAG AT 11906'. - CIRC REMAINING OIL OUT OF WELL OUT TO TIGER TANK. _ - VERIFY PU WEIGHT OF 58K 19:00 - 20:00 I 1.00 CASING P 11,909.00 RUNPRD PJSM FOR LAUNCHING BALL -LOAD AND LAUNCH 5/8" STEEL BALL. BALL ON SEATAT 46 BBLS AWAY. SHEAREDOUT AT 4500 PSI -PICKUP TO BREAKOVERAT 11899'. PUS'. VERIFIED RELEASED. CLEAN INDICATION - STACK 12K DOWN. SIMOPS: RU CEMEN_TERS. VERIFY LINE. 20:00 - 21:00 1.00 CASING P 11,909.00 RUNPRD CIRCULATE I% KCLAROUND. - SIMOPS: PRESSURE TEST CEMENTERS TO 4700#. GOOD TEST. - INITIALLY WHILE CIRCULATING KCL TO SHOE, LOOSING 60 BPH. _ 21:00 - 00:00 3.00 CASING N 11,909.00 RUNPRD - 89 BBLS OF 1% KCLAROUND CORNER. RATE COMING ABOVE 1:1. FLOW.CHECK WELL. TREND HIGHER THAN NORMAL - SHUT DRILLING CHOKE TO MONITOR. PRESSURE CLIMBED TO 68 PSI AND FELL TO ZERO. - DISCUSS WITH SUPTAND WOM OF POSSIBLE BREATHING -CIRCULATE BOTTOMS UPAT 2.25 BPM IN / 2.04 BPM OUT CHOKE OF 5700 - NOTHING SEEN ON BOTTOMS UPAFTER GETTING KNOWN COLUMN BACK THERE. - WALK RATE DOWN WHILE MAINTAINING 570# WELLHEAD. -INITIAL PRESSURES: 584# CIRC / 530 # WELLHEAD - 5 MIN PRESSURES: 435# CIRC / 409# WELLHEAD - PERFORM EXHALE TEST. TOOK 1.51 BBLS TO BLEED TO 0# ON A DECLINING RATE - PERFORM 10 MIN FLOW CHECK. GOOD - DISCUSS WITH SUPT AND ODE. - - MOVE FORWARD WITH CEMENT JOB Printed 4/12019 11*25:44AM **All depths reported in Drillers Depths" Common Well Name. 16-20 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Operation Summary Report Start Date: 3/11/2019 End Date: 3/13/2019 n'� no K3 -0198C -C:(843,827.00) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud DaleMme: 12/11/1985 12:00:OOAM Rig Release: 3/132019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @7 Date From - To Hrs _ _ (hr) 3/12/2019 00:00 - 04:00 4.00 04.00 - 0700 3.00 i0usft (above Mean Sea Level) Task Code NPT Total Depth (usfl) CASING P 11,909.00 CASING P 11,909.00 Phase Description of Operations Page 3 of 4 RUNPRD PJSM, GET FLUIDS SITUATED. MIX AND PUMP 27.91 BBLS OF CEMENT: EMENT WET AT 01:42 HRS. -ZERO IN MM ONCE DENSITY= 13.5 PPG - LOAD 27.91 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - RATE: 1.96 BPM IN, 1.94 BPM OUT ZERO OUT MM WITH CEMENT AT SHOE AT 73 BBLS AWAY - TAKE RETURNS TO TRIP TANK FOR MANUAL STRAP . - SHUT DOWN PUMPS AT 83.8 BBLS AWAY (10.8 BBLS BEHIND PIPE) A ANIJ LINEH WIPER PLUG AS FOLLOWS: - PICK UP TO BREAKOVER+16 FT (11881' MD) PER BTT REP, EXPOSE DOGS, SET DOWN AT 11893' MD (14 FT HIGHER) - PU: 54 KLBS, SO: 0.6K KLBS - SHIFT LINER WIPER PLUG DOWN, PICK BACK UP TO 11881' MDAND SIDE EXHAUST 3+3 BBLS - SET DOWN 10K AT 11893' MO AND LAUNCH PEE WEE DART. - PRESSURE UP ON WIPER PLUG AND ZERO MM. - LINER WIPER PLUG SHEARED AT 2000 PSI (0.3BBLS) DISPLACE LINER WIPER PLUG - 13.9 BBLS DISPLACED AT 2 BPM - PLUG BUMPEDAT 13.9 BBLS, 1300 PSI (13.9 BBLS CALCULATED) - OPEN P3 AND CHECK FLOATS. GOOD TEST. - CLOSE P3, PRESSURE UP TO 1000 PSI ON COIL, PICK UP AND CONFIRM PRESSURE DROP - CEMENT IN PLACE: 03:15 HRS - TOTAL LOSSES FROM CEMENT EXIT SHOE TD CEMPNT IN PI ACP n RRI R - RECIPRICATE FROM 9100' TO LINER TOP WITH EXHAUST. - CIRCULATE CEMENT OUT OF HOLE AT 2.89 BPM IN / 2.74 BPM OUT - COME OFFLINE AFTER BOTTOMS UP. RATES DROPPED TO 00 BPM OUT. RUNPRD POH - MUD WEIGHT: 8.42 PPG IN, 8.38 PPG OUT - RATE: 2.51 BPM IN, 2.01 BPM OUT - RATE: 2.51 BPM. CIRC PRESSURE: 800 PSI - TRIP SHEET DISCREPANCY AT 5900', STOP HERE AND FLOW CHECK - FLOW CHECK IS GOOD, NO FLOW. - CONTINUE POOH Printed 4/1/2019 11 25 44A **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 4 Common Well Name: 16-20A FE No Event Type: COM- ONSHORE (CON) Start Date. 3/11/2019 End Date: 3/13/2019 X3 -0198C -C: (843,827.00 ) Project: PBU Site: 16 Rig Name/No.: CDR -2 Spud Daternme: 12/11/1985 12:00:OOAM Rig Release: 3/13/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001931 _ Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _— _. _. 07:00 - 08:30 1.50 CASING P _(usft) 11,909.00 RUNPRD - -__._ MONITOR WELL FOR 20 MINUTEST AT BHA: STATIC I- PREP RIG FLOOR TO UD COLLARS - PJSM WITH CREWS FOR UD COLLARS AND RUNNING TOOL. - INJECTOR OFF: 07:45 - INSPECT LAST 50' OF CT FOR CHROME WEAR, NONE FOUND. - LID 6 DRILL COLLARS AND RUNNING TOOL. RECOVER 5/8" STEEL BALL 0890 - 1130 300 RIGD P 11,909.00 RUNPRD _ M/U FREEZE PROTECT BHA - CUT OFF CABLE AND RE -BOOT. TAIL IS TOO LONG WILL BE ACROSS CHECK VALVES DURING FP RUN -M/U BHA#7 FOR FREEZE PROTECT. -M/U INJECTOR TO WELL. INJECTOR ON AT 09:15. '- RIH TO 2200' AND FREEZE PROTECT WITH 60/40 MEOH FROM THERE. - POOH, LAY IN MEOH FLOW CHECKAT SURFACE IS GOOD. 11:30 - 12:30 1.00 RIGD P 11,909.00 POST T _ TAG STRIPPER, CLOSE MASTER AND SWAB. - PUMP REMAINING MEOH OUT TO TIGER TANK - OPEN CT RISER, REMOVE CHECK VALVES .. FROM BHAAND M/U CT RISER TO WELL. 12:30 - 14:30 2.00 RIGD P 11,909.00 POST PUMP SLACK BACKWARDS. CUT OFF 290' OF CT TO GIVE 1.9% SLACK. _ - OFFLOAD CUT COIL. 14.30 - 17:00 2.50 RIGD P 11,909.00 POST DRESS END OF CT FOR CT CONNECTOR. INSTALL CT CONNECTOR AND PULL TEST TO 50K, GOOD. PRESSURE TEST TO 4700 PSI, GOOD. INSTALL NOZZLE WITH SIDE PORTS, MAKE _ UP CT RISER TO WELL. 17:00 - 00:00 7.00 RIGD P 11,909.00 POST PUMP SLACK FORWARD AND JET STACK INSTALL BHI UOC WITHOUT FLOATS. BLOW DOWN RIG / COIL WITH BIG BOY AIR. NIPPLE DOWN STACK/ MPD LINE. --- - _. __. WORK ON RIG DOWN CHECKLISTS. 3/13/2019 00:00 - 02:00 2.00 RIGD P 11,909.00 POST CONTINUE WITH NIPPLE DOWN PROCESS BLOW DOWN STEAM. INSTALL 4-1/16" FLANGE ON BOPE FOR NEXT WELL. NIPPLE UP TREE CAPAND FLANGE ON TANGO VALVES, FILL TREE AND KILL LINE FULL OF NEET METHANOL. LTT TREE CAP TO 3500# ALL TREE VALVES CLOSED RIG RELEASED AT 02:00 Pnnted 4/1/2019 11:25:44AM **All depths reported in Drillers Depths" Daily Report of Well Operations 16-20A Ar'.TI\/ITYnATF CI IMMARV T/1/0=0/0/0 POST CDR2. Removed Tapped blind & installed tree cap. Torqued tree cap to 1010ft lbs. R/U CIW lubricator # 839 with 6" J plug. PT'd lubricator Low 300psi, High 3500psi. Set 6" J TWC #408 @ 115" mid window. Performed LTT on TWC. R/D target 90 #3 from tree. R/D CDR upper tree tree #1. R/U 6" CIW production tree. Torqued MV x 3/14/2019 SSV to 1010 ft lbs. ***JOB CONTINUED on 3/15/2019*** FWHP= TWC/0/0 T/I/0= TWC/0/0 POST CDR2 ***Continued from 3/1412018*** Torqued MV x THA to 769 ft lbs. R/U CIW #839 W/ 6" J pulling tool. PT'd Tree against TWC Low 300 psi, High 5000 psi. Pulled 6" J TWC #408 @ 145" Mid Window. R/D CIW Lubricator. Installed tree cap 3/15/2019 1 assembly & PT'd to 500psi. RDMO ***Job Complete*** FWHP = Vac/0/0 See Lo for T/1/0=25/0/5 Temp=Sl (CTD) Pumped 1 bbl 60/40 followed by 1.25 bbls crude to pressure up TBG for Liner Lap Pressure Test. 3/19/2019 WSR Continued on 03-20-2019 ***WELL S/I UPON ARRIVAL*** (ctd) DRIFT W/ 11'x2" DMYGUN (2.30 od), DEVIATE OUT @ 10,560'SLM RAN 24 ARM PDS CALIPER FROM 10,560' SLM TO SURFACE (good data) SET 4 1/2" WHIDDON CATCHER ON LTP @ 9,854' SLM PULLED BK-DGLV'S FROM STA#5 @ 5,330' MD & STA#6 @ 3,245' MD 3/20/2019 ***CONT WSR ON 3/21/19*** ***WSR continued from 02-19-2019*** Liner Lap Pressure Test ***PASSED*** to 2377 psi, Max Applied Pressure=2400 Pressured TBG to 2401 psi with 2.25 bbls total. TBG lost 15 psi in 1st 15 minutes and 9 psi in 2nd 15 minutes for a total of 24 psi during 30 minute test. Bled back 2 bbls crude. Tag hung on WV. Valve positions=SV,WV.SSV closed MV open 3/20/2019 CV's OTG FWHP=500/0/5 ***CONT WSR FROM 3/20/19*** (ctd) SET BK-LGLV AT ST #6 (3,234' MD) & BK-OGLV AT ST #5 (5,330' MD). PULL EMPTY 4 1/2" WHIDDON CATCHER SUB FROM 9,854' SLM. 3/21/2019 ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*— LRS Unit 72- Arrive on location to heat UR #087, Begin RU to UR, ***WSR Continued on 3/23/2019 03-24-19*** ***WSR Continued from 03-23-19*** LRS Unit 72- Heat 230 bbls 1 % KCL w/ safe lube to 3/24/2019 140* in UR #087 CTU #8 - 1.5" coil. Job Scope: Post Rig Perforations MIRU. MU & RIH with memory GR/CCL with 2.2" carrier/2.25" nozzle. Tag TD at 11897'. Log up to 9599'. POH. MU pert gun #1 BHA. 3/25/2019 ***In Progress' CTU #8 - 1.5" coil. Job Scope: Post Rig Perforations Continue to MU & RIH w/ HES 2.0" x 32' Maxforce Perf Gun #1. Tag PBTD, correct depth. PUH & Perforate Interval 11835'- 11866.16'. Pooh. All shots fired, ball recovered. MU & RIH w/ HES 2.0" x 32' Maxforce Perf Gun #2. Ta—g—MID and correct depth. PUH & erforate interval 11,785'- 11,816.16'. POOH. All shots fired & ball recovered. Cut 100ft of coil from chrome management. C/O packoffs. Check chains. MU & RIH w/ HES 2.0" x 32' Maxforce Perf Gun #3. Tag PBTD and correct depth. PUH & Perforate interval 11,738' 11,769.16'. POOH. 3/26/2019 ***In Progress*** Daily Report of Well Operations 16-20A CTU #8 - 1.5" coil. Job Scope: Post Rig Perforations Continue to POOH. All shots fired & ball recovered. MU & RIH w/ HES 2.0" x 32' Maxforce Perf Gun #4. Tag PBTD and correct depth. _Perforate Interval 11,695'- 11,726.16'. POOH. All shots fired & ball recovered. MU & RIH w/ HES 2.0" x 32' Maxforce Perf Gun #5. Tag PBTD and correct depth. Perforate interval 11,635.84'- 11,667'. POOH. All shots fired & ball recovered. Trim pipe, change pack-offs. MU & RIH w/ HES 2" x 10' Maxforce Gun #6. 3/27/2019 ***In Progress*** CTU #8 - 1.5" coil. Job Scope: Post Rig Perforations Continue to RIH w/ HES 2" x 10' Maxforce Gun #6. RIH w/ HES 2.0" x 10' Maxfo e Perf Gun #6. Tag PBTD and correct depth. Perforate Interval 11,627'- 11,636.84'. POOH. All shots fired & ball recovered, gun covered in paraffin. MU & RIH w/ HES 2" x 32' Maxforce Gun V. RIH w/ HES 2.0" x 32' Maxforce Perf Gun V. Tag PBTD and correct depth. Perforate Interval 11,582.84'- 11,614'. POOH All shots fired & ball recovered, gun covered in paraffin. MU & RIH w/ HES 2" x 10' MaxforceGun #8. RIH w/ HES 2.0" x 32' Maxforce Pert Gun #8. Tag PBTD and correct depth. Perforate Interval 11,550'- t/ 11,581.16. POOH. Freeze Protect Tbg w/ Diesel. All shots fired, ball recovered. Rig own U. 3/28/2019 ***Job Complete*** e 00'..41�� North America - ALASKA - BP PBU 16 16-20 16-20A 500292149301 Design: 16-20A Final Survey Report 14 March, 2019 Company: North America - ALASKA - BP Project: PBU Site: 16 Well: 16-20 Wellbore: 16-20A Design: 16-20A BP Final Survey Report Local Coordinate Reference: Well 1620 TVD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E MD Reference: Kelly Bushing / Rotary Table (a2 70.00usft (NABORS 4E North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK (4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK /Alaska zone 4 (26734.1586, Using geodetic scale factor Site 16, TR -10-15 Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well 16-20.16-20 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 16-20A Magnetics Model Name Sample Date Declination 1°) BGGM2018 3/112019 17.08 Design 16-20A Audit Notes: Version: Phase: ACTUAL Vertical Section: Depth From (TVD) +N/ -S (usft) (usft) 31.47 0.00 5,927,441.990 usft 718,969.880 usft 0.000 in Latitude: Longitude: Grid Convergence: 5,929,503.600 usft Latitude: 719,992.800 usft Longitude: 38.53 usft Ground Level: Mill Field Strength (°) (nT) 80.91 57,423 Tie On Depth: +El -W (usft) 0.00 10,300.00 Direction (°) 11.18 70° 12'15.545 N 148' 14'4.567 W 1.66 70° 12' 35.521 N 148° 13'33.153 W 36.40usft 3/142019 10.'50:50AM Page 2 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: Paul TVD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method; Minimum Curvature Design: 16-20A Database: EDM R5K - Alaska PROD - ANCPI Survey Program Date 3/14/2019 From To (usft) (usn) Survey (Wellbore) - Tool Name Description 100.00 10,300.00 1 Sperry -Sun BOSS gyro multi (16-20) BOSS -GYRO Sperry -Sun BOSS gyro multishot 10,361.00 11,909.00 Survey #1 (1 6-20A) MWD MWD -Standard Survey MD Inc Azl TVD TVDSS NIS E/W Northing Easting DLeg (usft) r) CI (usft) (usft) (usft) (usft) (usft) (usft) (°noousn) 31.47 0.00 0.00 31.47 -38.53 0.00 0.00 5,929,503.600 719,992.800 0.00 100.00 0.32 189.80 100.00 30.00 -0.19 -0.03 5,929,503.411 719,992.773 0.47 200.00 0.30 186.39 200.00 130.00 -0.72 -0.11 5,929,502.873 719,992.712 0.03 300.00 0.30 189.00 300.00 230.00 -1.24 -0.18 5,929,502.353 719,992.657 0.01 400.00 0.27 171.61 400.00 330.00 -1.73 -0.19 5,929,501.861 719,992.665 0.09 500.00 0.27 167.50 499.99 429.99 -2.20 -0.10 5,929,501.401 719,992.764 0.02 600.00 0.32 186.39 599.99 529.99 -2.71 -0.08 5,929,500.894 719,992.798 0.11 700.00 0.30 178.61 699.99 629.99 -3.24 -0.11 5,929,500,354 719,992.788 0.05 800.00 0.38 192.50 799.99 729.99 -3.83 -0.17 5,929,499.767 719,992.739 0.11 900.00 0.32 183.00 899.99 829.99 4.43 -0.26 5,929,499.162 719,992.670 0.08 1,000.00 0.40 189.19 999.99 929.99 -5.06 -0.33 5,929,498.537 719,992.618 0.09 1,100.00 0.35 153.31 1,099.98 1,029.98 -5.67 -0.25 5,929,497.922 719,992.717 0.24 1,200,00 0.50 122.70 1,199.98 1,129.98 -6.18 0.26 5,929,497.428 719,993.236 0.27 1,300.00 0.35 154.11 1,299.98 1,229.98 -6.69 0.76 5,929,496.933 719,993.752 0.27 1,400.00 0.40 165.70 1,399.98 1,329.98 -7.31 0.98 5,929,496.326 719,993.989 0.09 1,500.00 0.48 176.70 1,499,97 1,429.97 -8.06 1.09 5,929,495.574 719,994.121 0.12 1,600.00 0.87 194.80 1,599.97 1,529.97 -9.05 0.96 5,929,494.587 719,994.025 0.26 1,700.00 0.50 133.20 1,699.96 1,629.96 -9.91 1.13 5,929,493.728 719,994.219 0.62 1,800.00 0.63 100.20 1,799.96 1,729.96 -10.31 1.99 5,929,493.357 719,995.089 0.34 1,900.00 0.65 72.10 1,899.95 1,829.95 -10.23 3.07 5,929,493.466 719,996.167 0.31 2,000.00 0.75 49.00 1,999.95 1,929.95 -9.62 4.10 5,929,494.099 719,997.183 0,30 V. Sec (usft) 0.00 -0.19 -0.73 -1.25 -1.74 -2.18 -267 -3.20 -3.79 -4.40 -5.02 -5.61 -6.01 -6.42 -6.98 -7.70 -8.69 -9.50 -9.72 -9.44 -8.65 3/142019 10:50:50AM Page 3 COMPASS 5000.1 Build 81D am BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: PBU TVD Reference: Kelly Bushing / Rotary Table Q 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing / Rotary Table Cts 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc An TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (') (") (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,100.00 0.57 33.69 2,099.94 2,029.94 -8.78 4.87 5,929,494.965 719,997.927 0.25 -7.67 2,200.00 1.13 29.39 2,199.93 2,129.93 -7.51 5.63 5,929,496.259 719,998.650 0.56 -6.27 2,300.00 1.43 30.89 2,299.90 2,229.90 -5.58 6.76 5,929,498.221 719,999.718 0.30 4.16 2,400.00 1.37 42.50 2,399.87 2,329.87 -3.63 8.21 5,929,500.215 720,001.108 0.29 -1.97 2,500.00 1.68 40.00 2,499.84 2,429.84 -1.64 9.97 5,929,502.256 720,002.815 0.31 0.33 2,600.00 2.35 40.80 2,599.78 2,529.78 1.03 12.27 5,929,504.983 720,005.034 0.67 3.39 2,700.00 4.88 31.60 2,699.57 2,629.57 6.20 15.84 5,929,510.261 720,008.450 2.59 9.16 2,800.00 8.03 31.19 2,798.92 2,728.92 15.80 21.69 5,929,520.027 720,014.015 3.15 19.71 2,900.00 10.00 34.50 2,897.68 2,827.66 28.93 30.22 5,929,533.401 720,022.165 2.04 34.24 3,000.00 11.87 34.80 2,995.86 2,925.86 44.54 41.01 5,929,549.310 720,032.493 1.87 51.64 3,100.00 12.66 35.50 3,093.58 3,023.58 61.92 53.25 5,929,567.039 720,044.224 0.82 71.07 3,200.00 14.85 35.30 3,190.70 3,120.70 81.31 67.03 5,929,586.827 720,057.433 2.17 92.77 3,300.00 17.12 31.10 3,286.83 3,216.83 104.38 8204. 5,929,610.319 720,071.764 2.55 118.30 1 3,400.00 20.55 24.50 3,381.47 3,311.47 132.96 96.93 5,929,639.325 720,085.811 4.03 149.23 3,500.00 23.93 22.00 3,474.02 3,404.02 167.75 111.81 5,929,674.528 720,099.671 3.51 186.25 3,600.00 26.33 23.50 3,564.55 3,494.55 206.90 128.25 5,929,714.137 720,114.966 2.48 227.84 3,700.00 28.62 24.60 3,653.27 3,583.27 249.02 147.07 5,929,756.785 720,132.546 2.35 272.81 3,800.00 31.88 23.50 3,739.64 3,669.64 295.02 167.57 5,929,803.366 720,151.702 3.31 321.92 3,900.00 34.42 22.89 3,823.36 3,753.36 345.29 189.10 5,929,854.232 720,171.754 2.56 375.40 4,000.00 36.55 23.89 3,904.78 3,834.78 398.55 212.16 5,929,908.148 720,193.246 2.21 432.13 4,100.00 38.05 24.89 3,984.32 3,914.32 453.74 237.19 5,929,964.035 720,216.658 1.62 491.12 1 4,200.00 38.35 24.19 4,062.91 3,992.91 509.99 262.87 5,930,021.011 720,240.689 0.53 551.28 4,300.00 38.73 22.30 4,141.13 4,071.13 567.24 287.45 5,930,078.945 720,263.594 1.24 612.21 4,400.00 39.67 21.80 4,218.82 4,148.62 625.82 311.18 5,930,138.186 720,285.600 0.99 674.28 4,500.00 41.27 22.69 4,294.70 4,224.70 685.89 335.75 5,930,198.944 720,308.416 1.70 737.97 4,600.00 42.42 23.39 4,369.19 4,299.19 747.27 361.87 5,930,261.063 720,332.728 1.24 803.25 4,700.00 42.28 24.19 4,443.10 4,373.10 808.91 389.04 5,930,323.466 720,358.093 0.56 868.99 3/142019 10.50:50AM Page 4 COMPASS 5000.1 Build 81D 102 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: PBU TVD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD NDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ("1100usft) (usft) 4,800.00 42.43 24.60 4,516.99 4,446.99 870.27 416.87 5,930,385.605 720,384.119 0.31 934.58 4,900.00 42.67 24.39 4,590.66 4,520.66 931.81 444.90 5,930,447.930 720,410.351 0.28 1,000.39 5,000.00 42.87 24.30 4,664.07 4,594.07 993.67 472.90 5,930,510.584 720,436.528 0.21 1,066.51 1 5,100.00 43.07 24.60 4,737.24 4,667.24 1,055.72 501.11 5,930,573.425 720,462.919 0.29 1,132.85 5,200.00 43.90 24.69 4,809.80 4,739.80 1,118.27 529.81 5,930,636.779 720,489.780 0.83 1,199.77 5,300.00 43.67 25.30 4,8!11.99 4,811.99 1,180.98 559.04 5,930,700.316 720,517.176 0.48 1,266.97 5,400.00 44.08 26.39 4,954.08 4,884.08 1,243.36 569.26 5,930,763.540 720,545.560 0.86 1,334.01 5,500.00 44.22 26.39 5,025.83 4,955.83 1,305.75 620.22 5,930,826.808 720,574.688 0.14 1,401.23 5,600.00 44.36 28.30 5,097.40 5,027.40 1,367.78 652.30 5,930,889.744 720,604.946 1.34 1,468.30 5,700.00 43.63 28.00 5,169.33 5,099.33 1,429.04 685.07 5,930,951.923 720,635.922 0.78 1,534.75 5,800.00 43.18 28.69 5,241.98 5,171.98 1,489.51 717.70 5,931,013.322 720,666.768 0.65 1,60040 1, 5,900.00 42.68 28.80 5,315.20 5,245.20 1,549.23 750.45 5,931,073.965 720,697.768 0.51 1,665.34 6,000.00 41.97 29.50 5,389.13 5,319.13 1,608.04 783.25 5,931,133.698 720,728.834 0.85 1,729.39 6,100.00 41.42 29.69 5,463.80 5,393.80 1,665.87 816.10 5,931,192.467 720,759.983 0.56 1,792.50 6,200.00 40.78 30.60 5,539.16 5,469.16 1722.72 849.10 5931250.249 720,791.321 0.88 1,854.66 6,300.00 41.28 31.00 5,614.60 5,544.60 1,779.11 882.72 5,931,307.587 720,823.276 0.56 1,916.50 1 6,400.00 40.37 31.60 5,690.27 5,620.27 1,834.97 916.68 5,931,364.411 720,855.593 0.99 1,977.88 6,500.00 41.18 32.69 5,766.00 5,696.00 1,890.26 951.43 5,931,420.690 720,888.718 1.08 2,038.86 6,600.00 43.55 30.30 5,839.88 5,769.88 1,947.72 986.60 5,931,479.150 720,922.196 2.87 2,102.05 6,700.00 43.13 30.80 5,912.61 5,842.61 2,006.83 1,021 AS 5,931,539.244 720,955.341 0.54 2,166.80 6,800.00 41.75 30.30 5,986.41 5,916.41 2,064.94 1,055.79 5,931,598.327 720,987.935 1.42 2,230.46 6,900.00 39.85 24.60 6,062.13 5,992.13 2,122.84 1,085.93 5,931,657.080 721,016.382 4.18 2,293.11 7,000.00 40.32 22.89 6,138.64 6,068.64 2,181.78 1,111.86 5,931,716.746 721,040.575 1.20 2,355.961 7,100.00 41.00 22.30 6,214.50 6,144.50 2,241.94 1,136.89 5,931,777.603 721,063.843 0.78 2,419.82 7,200.00 40.22 21.00 6,290.42 6,220.42 2,302.43 1,160.91 5,931,838.767 721,086.088 1.15 2,483.83 7,300.00 39.67 20.60 6,367.08 6,297.08 2,362.45 1,183.71 5,931,899.423 721,107.129 0.61 2,547.13 7,400.00 39.33 20.39 6,444.25 6,374.25 2,422.03 1,205.98 5,931,959.625 721,127.654 0.37 2,609.90 311412019 10:50:50AM Page 5 COMPASS 5000.1 Build 81D BP bp Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: Pau TVD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A Database: EDM R5K - Alaska PROD - ANCPi Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V.Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/t00usft) (usft) 7,500.00 39.25 19.89 6,52164 6,451.84 2,481.48 1,227.78 5,932,019685 721,147.716 0.33 2,672.45 7,600.00 38.55 19.50 6,599.46 6,529.46 2,540.60 1,248.95 5,932,079.395 721,167.148 0.74 2,734.55 7,700.00 38.02 19.39 6,677.96 6,607.96 2,599.03 1,269.57 5,932,138.391 721,186.062 0.53 2,79586 7,800.00 37.83 19.39 6,756.84 6,686.84 2,657.00 1,289.98 5,932,196.935 721,204.769 0.19 2,856.70 7,900.00 37.67 19.30 6,835.91 6,765.91 2,714.77 1,310.26 5,932,255.264 721,223.357 0.17 2,917.30 8,000.00 37.60 18.80 6,915.10 6,845.10 2,772.49 1,330.19 5,932,313.536 721,241.597 0.31 2,977.79 8,100.00 37.48 18.60 6,994.39 6,924.39 2,830.20 1,349.72 5,932,371.793 721,259.442 0.17 3,038.19 8,200.00 37.22 18.10 7,073.89 7,003.89 2,887.78 1,368.82 5,932,429.905 721,276.856 0.40 3,098.39 8,300.00 36.97 18.10 7,153.65 7,083.65 2,945.11 1,387.56 5,932,487.753 721,293.915 0.25 3,158.26 8,400.00 36.57 17.69 7,233.76 7,163.76 3,002.08 1,405.96 5,932,545.226 721,310.641 0.47 3,217.71 8,500.00 36.32 17.80 7,314.20 7,244.20 3,058.69 1,423.96 5,932,602.334 721,326.990 0.28 3,276.74 8,600.00 36.07 17.00 7,394.90 7,324.90 3,115.07 1,441.53 5,932,659.200 721,342.901 0.43 3,335.45 8,700.00 35.65 17.39 7,475.94 7,405.94 3,171.03 1,458.84 5,932,715.641 721,358.580 0.48 3,393.71 8,800.00 35.32 17.30 7,557.37 7,467.37 3,226.44 1,476.15 5,932,771.528 721,374.264 0.33 3,451.42 8,900.00 35.00 17.60 7,639.13 7,569.13 3,281.38 1,493.42 5,932;828.941 721,389.923 0.36 3,508.67 9,000.00 34.43 18.00 7,721.33 7,651.33 3,335.60 1,510.82 5,932,881.846 721,405.743 0.61 3,565.21 9,100.00 34.17 17.80 7,803.94 7,733.94 3,389.22 1,528.14 5,932,935.750 721,421.493 0.28 3,621.20 9,200.00 35.73 19.30 7,885.90 7,815.90 3,443.52 1,546.38 5,932,990.556 721,438.139 1.78 3,678.01 9,300.00 36.12 20.80 7,966.88 7,896.88 3,498.64 1,568.50 5,933,046.228 721,456.642 0.96 3,735.97 9,400.00 35.72 22.80 8,047.87 7,977.87 3,553.10 1,588.28 5,933,101.302 721,476.824 1.24 3,793.63 9,500.00 35.45 23.10 8,129.19 8,059.19 3,606.69 1,610.97 5,933,155.523 721,497.942 0.32 3,850.59 9,600.00 34.82 23.10 8,210.97 8,140.97 3,659.62 1,633.55 5,933,209.092 721,518.969 0.63 3,906.90 9,700.00 33.85 23.39 8,293.54 8,223.54 3,711.45 1,655.80 5,933,261.540 721,539.707 0.98 3,962.06 9,800.00 32.88 24.10 8,377.06 8,307.06 3,761.79 1,677.95 5,933,312.503 721,560.371 1.05 4,015.74 9,900.00 32.00 24.69 8,461.46 8,391.46 3,810.64 1,700.10 5,933,361.979 721,581.089 0.94 4,067.96 10,000.00 31.13 25.80 8,546.66 8,476.66 3,857.99 1,722.42 5,933,409.954 721,602.018 1.05 4,118.74 10,100.00 30.05 26.89 8,632.74 8,562.74 3,903.59 1,744.99 5,933,456.195 721,623.254 1.21 4,157.85 3/142019 10:50:50AM Page 6 COMPASS 5000.1 Build 81D by Company: North Amenca-ALASKA-BP Project: PBU 8,914.57 Site: 16 1,777.19 Well: 16-20 Reference: Wellbore: 16-20A 32.51 Design: 16-20A Survey 8998.26 MD Inc TVD Reference: (usft) 1°I Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E 10 200.00 29.22 10,300.00 28.17 Tie-in Point MD Reference: 10,361.00 28.01 KOP - Top of Whipstock 4,157.79 10,381.93 29.56 Interpolated Azimuth North Reference: 10,413.78 36.19 Interpolated Azimuth 10,440.97 40.50 Interpolated Azimuth 4,172.52 10,475.25 48.17 First Good Survey 721,585.605 10,500.93 53.70 10,530.42 59.89 10,560.87 66.72 10,590.54 73.66 10,618.35 79.73 10,650.17 87.14 10,680.39 93.50 10,710.44 95.48 10,740.59 99.04 10,770.45 98.75 10,800.98 98.54 10,830.22 97.89 10,850.12 100.01 10,879.04 95.81 10,911.22 94.71 BP Final Survey Report 322.09 8,984.57 8,914.57 4,119.51 1,777.19 Local Co-ordinate Reference: Well 16-20 32.51 4,385.91 314.39 8998.26 8,928.26 TVD Reference: 1,759.06 Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E 721,630.434 31.82 4,402.24 MD Reference: 306.57 Kelly Bushing / Rotary Table @ 70.O0usft (NABORS 4E 8,938.33 4,157.79 1,737.83 5,933,710.064 North Reference: True 4,415.84 299.54 9,014.73 8,944.73 4,172.52 Survey Calculation Method: Minimum Curvature 721,585.605 32.88 4,425.89 292.16 Database: 8,948.37 EDM R5K-Alaska PROD -ANCP1 1,686.75 Azi TVD TVDSS N/S E/W Northing Basting DLeg V. Sec (°) (usft) (usft) 5,933,745.614 (usft) (usft) (usft) (usft) (°/1100usft) (usft) 27.39 8,719.66 8,649.66 8,945.84 3,947.60 1,767.54 5,933,500.835 721,644.515 0.87 4,215.40 28.50 8,807.38 8,737.36 3,990.01 1,790.04 5,933,543.888 721,665.761 1.18 4,261.37 27.89 8,861.20 8,791.20 4,015.33 1,803.61 5,933,569.585 721,678.588 0.54 4,288.83 14.85 8,879.56 8,809.56 5,933,742.784 4,024.67 1,807.23 5,933,579.030 721,681.940 30.84 4,298.70 358.43 8,906.35 8,836.35 8,932.80 4,041.72 1,809.00 5,933,596.120 721,683.204 34.72 4,315.77 347.68 8,927.69 8,857.69 4,058.40 1,806.89 5,933,612.728 721,680.612 29.16 4,331.72 337.37 8,952.22 8,882.22 4,081.12 1,799.58 5,933,635.231 721,672.644 30.64 4,352.60 330.85 8,968.41 8,898.41 5,933,704.229 4,090.02 1,790.84 5,933,652.862 721,663.392 29.18 4,36846 322.09 8,984.57 8,914.57 4,119.51 1,777.19 5,933,672.944 721,649.144 32.51 4,385.91 314.39 8998.26 8,928.26 4,139.73 1,759.06 5,933,692.630 721,630.434 31.82 4,402.24 306.57 9,008.33 8,938.33 4,157.79 1,737.83 5,933,710.064 721,608.692 34.07 4,415.84 299.54 9,014.73 8,944.73 4,172.52 1,715.16 5,933,724.124 721,585.605 32.88 4,425.89 292.16 9,018.37 8,948.37 4,186.27 1,686.75 5,933,737.040 721,556.803 32.75 4,433.87 284.19 9,018.20 8,948.20 4,195.68 1,658.07 5,933,745.614 721,527.868 33.73 4,437.55 274.80 9,015.84 8,945.84 4,200.62 1,628.56 5,933,749.692 721,498.226 31.84 4,436.67 264.74 9,012.02 8,942.02 4,200.51 1,598.70 5,933,748.712 721,468.380 35.14 4,430.77 255.39 9,007.40 8,937.40 4,195.43 1,569.67 5,933,742.784 721,439.517 30.95 4,420.16 245.19 9,002.80 8,932.80 4,185.26 1,541.30 5,933,731.796 721,411.451 33.04 4,404.68 235.36 8,998.61 8,928.61 4,170.93 1,516.20 5,933,716.739 721,386.782 33.35 4,385.75 228.85 8,995.51 8,925.51 4,158.86 1,500.69 5,933,704.229 721,371.636 34.02 4,370.91 218.15 8,991.52 8,921.52 4,138.11 1,481.02 5,933,682.914 721,352.576 39.41 4,346.74 207.90 8,988.56 8,918.56 4,11128 1,463.58 5,933,655.587 721,335.927 31.90 4,317.04 3/142019 10,50,50AM Page 7 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: PBU TVD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing / Rotary Table @ 70.00us0 (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usR) (°) (°) (usR) (usft) (usR) Waft) (usR) (usR) (°1100usft) (usR) 10,941.88 91.07 198.73 8,987.01 8,917.01 4,083.19 1,451.48 5,933,827.160 721,324.650 32.14 4,287.14 10,970.46 91.81 195.18 8,986.29 8,916.29 4,055.87 1,443.15 5,933,599.606 721,317.120 12.68 4,258.72 11,000.48 91.44 193.69 8,985.44 8,915.44 4,026.81 1,435.67 5,933,570.342 721,310.490 5.11 4,228.76 11,031.38 90.15 196.16 8,985.01 8,915.01 3,996.96 1,427.71 5,933,540.272 721,303.406 9.02 4,197.93 11,060.39 91.50 200.33 8,984.57 8,914.57 3,969.42 1,418.64 5,933,512.479 721,295.134 15.22 4,169.15 11,090.68 92.98 206.79 8,983.36 8,913.36 3,941.69 1,406.55 5,933,484.412 721,283.857 21.79 4,139.60 11,120.75 93.23 212.62 8,981.73 8,911.73 3,915.62 1,391.67 5,933,457.922 721,269.751 19.38 4,111.15 11,150.60 92.58 218.44 8,980.21 8,910.21 3,891.37 1,374.36 5,933,433.179 721,253.149 19.59 4,084.00 11,180.73 92.58 222.86 8,978.86 8,908.86 3,868.54 1,354.75 5,933,409.788 721,234.220 14.65 4,057.80 11,210.75 92.73 227.67 8,977.47 8,907.47 3,847.44 1,333.46 5,933,388.077 721,213.548 16.01 4,032.97 11,244.90 92.76 229.47 8,975.83 8,905.83 3,824.87 1,307.88 5,933,364.772 721,188.644 5.27 4,005.87 11,270.59 90.49 233.63 8,975.10 8,905.10 3,808.90 1,287.78 5,933,348.231 721,169.013 18.44 3,986.31 11,303.41 89.39 238.19 8,975.14 8,905.14 3,790.51 1,260.60 5,933,329.057 721,142.389 14.29 3,963.00 11,330.67 91.29 243.31 8,974.97 8,904.97 3,77720 1,236.83 5,933,315.056 721,119.013 20.03 3,945.33 11,360.95 90.61 245.17 8,974.47 8,904.47 3,764.04 1,209.56 5,933,301.111 721,092.143 6.54 3,927.14 11,391.38 89.54 239.65 8,974.43 8,904.43 3,749.95 1,182.61 5,933,286.245 721,065.608 18.48 3,908.09 11,420.60 WAS 236.61 8,974.93 8,904.93 3,734.53 1,157.80 5,933,270.105 721,041.260 11.01 3,888.15 11,445.64 92.21 232.93 8,974.78 8,904.78 3,720.09 1,137.35 5,933,255.077 721,021.244 20.90 3,870.02 11,472.94 98.37 230.91 8,972.74 8,902.74 3,703.31 1,115.93 5,933,237.676 721,000.319 16.93 3,849.40 11,506.19 101.02 228.84 8,967.71 8,897.71 3,682.13 1,090.80 5,933,215.782 720,975.822 15.28 3,823.76 11,534.62 103.65 225.71 8,961.64 8,891.64 3,663.30 1,070.40 5,933,196.360 720,955.979 14.19 3,801.32 11,563.99 107.31 225.61 8,953.80 8,883.80 3,643.52 1,050.16 5,933,176.001 720,936.324 12.47 3,777.99 11,595.38 108.68 222.30 8,944.10 8,874.10 3,622.03 1,029.44 5,933,153.922 720,916.240 10.94 3,752.90 11,625.56 110.80 220.90 8,933.91 8,863.91 3,600.79 1,010.58 5,933,132.143 720,898.007 8.27 3,728.40 11,655.27 111.71 217.56 8,923.14 8,853.14 3,579.35 993.07 5,933,110.201 720,881.130 10.92 3,703.97 11,685.70 111.42 214.69 8,911.95 8,841.95 3,556.50 976.39 5,933,086.869 720,865.123 8.82 3,678.32 11,715.86 112.77 211.47 8,900.60 8,830.60 3,533.09 961.13 5,933,063.027 720,850.559 10.86 3,652.39 3/142019 10.50.50AM Page 8 COMPASS 5000.1 Build 81D 3/142019 10:50:50AM Page 9 COMPASS 5000.1 Build 81D BP bp Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project'. PBU TVD Reference: Kelly Bushing I Rotary Table @ 70.00usft (NABORS 4E Site: 16 MD Reference: Kelly Bushing! Rotary Table @ 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sac (usfu (°I V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 11.746.15 11262 209.61 8,888.92 8,818.92 3,509.02 946.94 5,933,038.558 720,837.068 5.69 3,626.03 11,776.01 110A7 211.80 8,878.02 8,808.02 3,485.12 932.74 5,933,014.257 720,823.573 10.87 3,599.83 11,805.83 110.13 217.29 8,867.74 8,797.74 3,462.07 916.87 5,932,990.758 720,808.384 17.28 3,574.15 11,835,87 110.76 223.08 8,857.24 8,787.24 3,440.58 898.72 5,932,968.745 720,790.868 18.18 3,549.54 11,865.83 110.35 230.55 8,846.71 8,776.71 3,421.40 878.28 5,932,948.979 720,770.999 23.38 3,526.76 11,875.86 109.99 232.41 8,843.25 6,773.25 3,415.54 870.92 5,932,942.904 720,763.807 17.77 3,519.58 11,909.00 109.99 232.41 8,831.92 8,761.92 3,396.54 846.24 5,932,923.197 720,739.694 0.00 3,496.16 Projection to TD 3/142019 10:50:50AM Page 9 COMPASS 5000.1 Build 81D EM RP(eN: PBU /{1 ^^�•eAuxuPr7R6 xgeetam: n. DETAILS: 1620A IER1mCERFpNA1[x 1620A CoaAreYlWElaehnrcx' Nblifi.M. Rue PYP WPk 1620 y9� WNn111VRI Palaena: M1WBiimA/PodyiebY�i0.W�eAAQH00R60:61 ROi 1030 AchW: "M A'nwieE �NPaMerce: M1KI Y�'Y9/PWYiYMg1RfOA1g1PBM61E61 PoaYearaann MD: 10300.00 ceeuaew uePm'. u-P.eYPc�Yw. EPOg(200 uBW,P) 01 Q1 T Ql Z N O 0 0 0 C o ^ Y / 'ADD, N_ N O /1 A (D � /0 n ON D 0 3 ^. m rCr � G� m> m� ma A O D m -- ---- - m a'W PP -- - - m m°'WWW°i O J V V A (Nil 4Nl fNJ N++ O f0 0 J V A A N U U A A tOi] N O+ z PPPWWW W PPWWW°1 O1Tw4'W 4' W WPWWPPP 7 O JD JD J A WD 5.J W W N O W W V V A A U U U L A W N Wm+q'l 'W mm�mq'l+y',+mm+m=+a+q'l=amam tD- �' 0l D d W D D D D m D y D AD N N m N W + � D a U + N N N+++++++++ N W W W+ O+++ N N N N N O y W V V V W w W W W+ W W (O U N N N N W W W W A A N V W w q C O O O O U O O O O D U U AO D U U O O O O O O O D U T q ... 0 0 0 0 .... o ... 0 .... 0000000 n .... 0 0 0 0 0 0 0 o b 0 0 0 ..... 0 0 0 0 0 + t t i+ W b V V J J V V V W W V V N U N W W W b W W+ W n q q o w W W W O++++ N N N N N C O y q N W W W W W W W W+ b W W U N W W VV V W W N VJ VVA O b N N A V W O OWV �AWr mO W �AWr WW WW WW NO N .bW ,WWV W W N N W 41 W O A t0 W i0 W V Ur N d q N V N W W V V V W W V V W J O + O O b b b W A V O V � + N N N+++++++++ N W W W+ O+++ N N N N N O y W V V V W w W W W+ W W (O U N N N N W W W W A A N V W w q C O O O O U O O O O D U U AO D U U O O O O O O O D U T q ... 0 0 0 0 .... o ... 0 .... 0000000 n .... 0 0 0 0 0 0 0 o b 0 0 0 ..... 0 0 0 0 0 + t t i+ W b V V J J V V V W W V V N U N W W W b W W+ W n q q o w 3 m F 3 3 c 2 v 3 � m q N NNN NNN w O p p o ? 3 b Z (�(� n J V a 0 ' 2 0 0 O O N N S > 8 all O + O +W a Z O O C O 00 c J D D D o N w 0 m m F 3 3 cw w N 3 m q N NNN NNN O 1 1 m m p v Q Z (�(� n J V a o 0 ' 00 00 N N S > z z D D m m 00 A A m m 00 8 0 m O a Printed 4/142019 9:46:20AM North America - ALASKA - BP Page 1 or 2 Cementing Report Common Well Name: 16-20 / 01 _ - - - Report no.: 1 Report date. 3/12/2019 Project PBU - - TSrt.: 16 Stan Date: 3/11/2019 End Date3/13/2019 Spud Date/Time: 12/11/1985 - Event Type: COM- ONSHORE (CON) AFE No X3 -0198C -C: (843,827.00 ) Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR -2 Rig Release: 3/13/2019 Ac ive datum: Kelly Bushing / Rotary Table @70.00usB (above Mean Sea Level) BPUOI-. USA00001931 eensrd Into mason Job type. Primary Cement job start date/time: 3/12/2019 12:OOAM Job end date/time: 3/12/2019 4:OOAM Cement Company: SCHLUMBERGER Cementer: Cemented Strang: PRODUCTION LINER 1 String Size. 2.875 (in) String Set TMD: 11,909.00 (usR) Hole Size: 4.250 (in) PIM Mevamard Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (imt/avg/ni (ft-Ibt) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name. CEMENT Fluids (1 W 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield: 1.3100 ((N/sk) Mix Water Ratio: 4.305 (gallsk94) Excess: 20.00(%) Mix Method: BATCH Sacks Used: 119.40 (941b sacks) Water Volume', 12.2 (bbl) Excess Slurry Volume: 4.6 (bbl) Density Measured by. DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 27.9 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: PV: YP: Viscosity'. Gels 10 Sec: Gels 10 Min: Addidvn Name Type Amount Units Concentration Unit D163 CEMENT 5.000 %BWOC D047 ANTIFOAMAGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.100 GAUSX DO65 DISPERSANT 1.000 %BWOC D600 GAS -BLOCK 1.500 GAUSX D167 FLUID LOSS 0.100 % BWOC Fluid Teeb Thick time Thick Free vrater Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cC30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (^F) ('F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min psi °F min 5.95 90.00 0.00 80.00 42.0 180.00 Printed 4/142019 9:46:20AM Printed 4/2412019 9:46:20AM North America - ALASKA - BP Page z m z Cementing Report Common Well Name : 18-20 / 01 . Report no.: 1 lReporldide,: 3/12/2019 Project: PBU � Site: 16 Spud Date/Time: 12/11/1985 Event Type: COM- ONSHORE (CON) Start Dale: 3/11/2019 End Date: 3/13/2019 AFE No.: X3-0198C-C: (843,827.00 ) Contractor NABORS ALASKA DRILLING INC. Rig Name/No.'. CDR-2 Rig Release: 3/13/2019 BPUOI: USA00001931 Active datum: Kelly Bushing / Rotary Table @70.00usft (above Mean Sea Level) Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom plug Pressure Float Pressure Relume Circulate Cmt Val to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held HeW Prior Surface Mud Lost Flow (gpm) (psi) (hr) (bbl) (bbl) After (p•9 (mm) 1 PRIMARY CEMENT 9,874.00 11,909.00 Y Y y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Pumped Disp. Rate TMD TMD pmp date/time job Usetl temp. 18hstatic temp. (bbl) Rate (bbymin) (usft) (usft) (sc() bbymin TMs Casing Test Shoe Teat Liner Top Teat Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (use) Time: (min) Tool: N Positive Test (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test', (hr) Cmt Found on Tool: N Log/Survey Ewlustlon Interpretation Summery CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient N CET Run: N ,lab Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 4/2412019 9:46:20AM BA ER 0 PRINT DISTRIBUTION LIST FUGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 16-20A FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(cDbhge.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V t BP North Slope, F.OA. PROC, PRP -20 (Offer 109) D&C Wells Project Aides Ann: Benda G'lassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 17011 G Street No 218113 30573 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com LOG TYPE GR - RES LOG DATE March 10, 2019 TODAYS DATE April 8, 2019 Revision Details: Rev. Requested by: FIELD I FINAL CD/DVDFINAL PRELIM LOGS (las, dlis, PDF, META, I SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES I#OFCOPIES 4 �u V APR 10 2019 Anchorage, AK 99501 AO G C C 3 EsxonMobll, Alaska 0 0 'I 0 0 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC 0 i 0 0 Alto: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** I 0 0 i 0 0 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR sBP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ,Attn: Rana Elghonimy TOTALS FOR THIS PAGE: 0 2 4 2 0 THE STATE °fALASKA GOVERNOR BILL WALKER John Egbejimba Engineering Team Leader — CTD & RWO BP Exploration (Alaska), Inc. P.O Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Main: 907.297.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 16-20A BP Exploration (Alaska), Inc. Permit to Drill Number: 218-118 Surface Location: 1447' FNL, 1216' FWL, SEC. 24, T10N, R15E, UM Bottomhole Location: 1995' FSL, 2052' FWL, SEC. 13, TION, R15E, UM Dear Mr. Egbejimba: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair k� J DATED this 1 ° day of October, 2018. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMISSI. PERMIT TO DRILL 20 AAC 25.005 u as,..%-4tJ Vr.�L:') 1a. Type of Work:1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ ic. Spei if well is proposed for. Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil 0 'Service -Winj ❑ Single Zone O Coalbed Gas ❑ Gas Hydrates❑ 1 0- Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone 11 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0' Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29SIO5380 PBU 16-20A ' 3 Address: 6. Proposed Depth: 12. FieldlPool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 11914' ' TVD: 8761 PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028332 ' Surface: 1447' 11216' 1 Sec. 24, TION, RISE, UM 6 DNR Approval Number: 13. Approximate spud date: 2551' FSL, 3015' 1 Sec. 13, T10N, RISE, UM Top of Productive Horizon: 79-081 February 1, 2019 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 1995' FSL, 2052' F44L, Sec. 13, T10N, RISE, UM 12890 4b, Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: - 70.0 feet 15. Distance to Nearest Well Open Surface: x- 719993 y- 5929504 Zone - ASP 4 GL Elevation above MSL: 38.10 feet to Same Pool. 165 16. Deviated wells: Kickoff Depth: 10355 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3643 - Surface: 2763 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole CasinoWeight Grade Cou lin Len 81 MD TVD M TVD includino stage data 4-1/4" 3-1/4'x2-7/8" 6.5#/6.5# 13Cr85 TCII/STL 2044' 9870' 1 8366'ss 11914' 876255 130 six Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (li Total Depth TVD (ffy. Plugs (measured): Effect. Depth MD (ff): Effect. Depth TVD (ff): Junk (measured). 10800 9245 10419 10419 8912 10440,10519 Casing Length Sin Cement Volume MD TVD Conductor/Structural 80 20" 1925# Poleset 34-114 34-114 Surface 2488 13-3I8" 2300 sx CS III, 400 sx CS II. 150 sx CS II 33-2521 33-2520 Intermediate 10294 9-5/8" 500 sx Class'G', 300 sx CS 1 31 -10326 31 -8830 Scab Liner 7824 7" x 5-12" x 4.12" 1065 sx Class'G' 2326-10150 2326-8676 Liner 580 7• 300 sx Class'G' 10119-10799 8649-9244 Perforation Depth MD (ff): 10320 - 10470 Perforation Depth TVD (fi 8825-8957 Hydraulic Fracture planned? Yes ❑ No if • " I & 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Leemhuis. Jacob from without prior written approval. Authorized Name Egbelimbe John Contact Email Jacob.LeemhuisCbp.com Authorized Title Engineering Team Leader- CTO & RWO Contact Phone +1 907 564 4989 Authorized Signature Date 1i 20 S Commission Use Only Permitto Ddll QQ /U Permit Approval See cover letter for other Number. G/CJ'/(!% API: 50- 029-21493-01-00 Date: requirements: Conditions of approval : If box is checked, well may not be used to explore for, lest, or produce coalbed meth ne, gas hydrates, or gas contained in shales: 17 Other: 6mFe'remT 1 O 351"0-!511.-.,L,. Samples mi Yes ❑ / No Mud log req'tl: Yes No 1CrvJ1`s. 1,1NFR CEMsn9T-T'b SfeTiS h'r H2Smeasures Yes Ld/ No Directional svy req'd: Yes No ❑/ —❑/ \kogZTArn3c.ETb ZO4fkc.2Si1ZCL)Spacingexceptionregd: Yes ❑ No Y Inclination Yes ❑ No -only Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: t O I i O ln a' Form 10-401 Revised 5/2017 This permit is valid for 24 r5orklB'fioln Ii t t�aido al (20 AAC 25.005(8)) Submit Form and VVVVV 11 `` /`l Ass ents in Duplicat /b, z.; To: Alaska Oil & Gas Conservation Commission From: Jacob Leemhuis CTD Engineer Date: October 1, 2018 Re: 16-20A Permit to Drill Request p Approval is requested for a permit to drill a CTD sidetrack lateral from well 16-20 with the Nabors CDR2 Coiled Tubing Drilling rig on or around February 1", 2019. Proposed plan for 16-20A: Well 16-20A is proposed as a pattern rotation side-track targeting unswept Zone 4A & 4B hydrocarbons. It will receive injection support from wells 03-04 and 16-02, as well as the planned MIST injector 16-14C. The side-track 16-20A will be a "1560' horizontal CST that will kick -out from the 16-20 parent in Zone 4. This well is planned to be drilled on or around February 1", 2019. During pre -rig work a 7" whipstock will be set at "'10,355' MD. The rig will move in, test BOPE and kill the well. A 3.80" window + 30' of rathole will be milled. The well will cross through Zone 4 and Zone 3 to target resources in 4A and 4B. The proposed side-track will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place and selectively perforated (post rig). Rig Work (scheduled to begin February 151, 2019) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2762 psi). 2. Mill 3.80" Window and rathole. 3. Drill production section: 4.25" OH, 1560'. 4. Run 3-1/4" x 2-7/8" 13Cr liner to TD. 5. Pump primary cement job: 25.7 bbis, 15.3 ppg Class G, TOC at TOL (9870 MD) •. 6. Freeze protect well to a min 2,200' TVDss. 7. Close in tree, RDMO. ' Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. V: Pull TWC (if set) 2. FB: liner lap test, PT LTP 3. SL: Set Baker LTP w/ PTSA stinger (if needed), set LGLVs, drift for coil perfjob. 4. C: Perforate (-200'). Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (201 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, 13Cr solid liner: 10,800' MD —11,914' MD • 3-1/4", 6.6#, 13Cr solid liner: 9870' MD —10,800' MD • A planned 26.9 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 9870' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (201 psi over -balance). ✓ • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 110', inclination at kickoff point is 28°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 12,690' • Distance to nearest well within pool — 165'(16-14B) Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Perforating: • Perforating will be completed post rig (-200'). Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • DS -16 is considered a H2S pad. Recent H2S reading on 16-20: 160 ppm (5/17/2018). Max recorded on the pad: 500 ppm on 16-15 (5/27/2012). • No fault crossings planned. • Lost circulation risk on 16-20A is considered Low. Reservoir Pressure: • The reservoir pressure on 16-20A is expected to be 3643 psi at 8800' TVDSS (7.96 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2763 psi. - • A min EMW of 8.4 ppg for this well will provide 201 psi over -balance to the reservoir. Jacob Leemhuis CC: Well File CTD Engineer Joseph Lastufka 564-4989 North America - ALASKA - BP PBU 16 16-20 PLAN 16-20A Plan: 16-20A WP02 BP Coil Tubing Report 27 September, 2018 BAIUGHES 0 1 a GE company Company: North America - ALASKA - BP Project: PBU Site: 16 Well: 16-20 Wellbore: PLAN 16-20A Design: 16-20A VVP02 BP ER BP Coil Tubing Report BA UGHES A mm0any Local Co-ordinate Reference: Wall 1620 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 •OGP-Usa AK [4267.15864) Using Well Reference Point Map Zone: NAD27 •OGP-Usa AK / Alaska zone 4 [26734.1586• Using geodetic scale factor Site 16, TR -10.15 Site Position: Northing: 5,927,441.990 usft Latitude: 70" 12'15.545 N From: Map Fasting: 718,969.880 usft Longitude: 148° 14'4,567 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.66 ° Well 16-20, 16-20 Well Position -NI-S 0.00 usft Northing: 5,929,503.600 usft Latitude: 70" 12'35 521 N +E/ -W 0.00 usft Easting: 719,992.800 usft Longitude: 148° 13'33.153 W Position Uncertainty 0.00 waft Wellhead Elevation: 38.53 usft Ground Level: 38.10usft Wellbore PLAN 16-20A Magnetics Model Name Sample Date Declination Dip Angle Field Strength f°I I"1 (nT) BOGM2018 2/1/2019 1712 8091 57,427 Design 16-20A WP02 Audit Notes: Version: Phase: PLAN Tie On Depth: 10.300 Do Vertical Section: Depth From (TVD) +N/ -S +EI -W Direction (usft) (usft) (usft) (°) -38 53 0.00 0.00 13.63 9/27/2018 11:09:OOAM Page 2 COMPASS 5000.1 Build 81D Company: North Amenca- ALASKA -BP BID Project: PBU Site: 16 Well: 16-20 Wellbore: PLAN 16-20A ER BP Coil Design: 16-20A WP02 Survey Tool Program Date 9/27/2018 IGHES From TO (usft) (usft) Survey (Wellbore) 100.00 10,300.00 1 Sperry -Sun BOSS gyro multi (16-20) 10,300.00 11,914.39 16-20A WP02 (PLAN 16-20A) Local Co-ordinate Reference: Planned Survey MD Inc Azi TVDSS (usft) I°1 1°1 (usft) 10,300.00 28.17 28.50 8,737.38 16-20 Actual Survey - TIP MD Reference: 10,318.85 28.11 28.29 8,754.00 LCUITSAD True 10,355.00 28.01 27.89 8,785.90 KOP Survey Calculation Method: 10,375.00 29.58 26.07 8,80343 Start DLS 35.00 TFO-30.00 Database: 10,394.68 35.70 20.17 8,820.00 42N Description 10,400.00 37.39 18.87 8,82427 10,405.00 39.00 17.74 8,828.20 Start DLS 35.00 TFO.85.00 10,437.34 41.30 0.51 8,853.00 42P 10,471.87 46.25 344.53 8,878.00 TCGL Northing Basting 10,500.00 51.69 333.63 8,896.49 10,565.72 67.29 313.85 8,930.00 BCGL (°/100usft) (usft) 10,600.00 76.29 305.49 8,940.72 10,650.61 90.00 294.16 8,946.77 Start DLS 35.00 TFO -70.00 0.00 3,997.83 9/27/2018 11:09:00AM Page 3 COMPASS 5000 1 Build 81D BID BA ER BP Coil Tubing Report IGHES ° Local Co-ordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD . ANCP1 Tool Name Description BOSS -GYRO Sperry -Sun BOSS gyro muftishot MWD MWD - Standard NIS EIW Northing Basting DLeg V. Sec TFace (usft( (usft) (usft( (usft) (°/100usft) (usft) (°) 3,990.01 1,790.04 5,933,543.888 721,665.761 0.00 4,299.42 0.00 3,997.83 1,794.26 5,933,551.827 721,669.759 0.60 4308.01 -119.39 4,012.84 1,802.27 5,933,567.057 721,677.326 0.60 4,324.48 -119.21 4,021.42 1,806.64 5,933,575.766 721,681441 9.00 4,333.85 -30.00 4,031.19 1,810.76 5,933,585.648 721,685.274 35.00 4,344.32 -30.00 4,034.17 1,811.82 5,933,588.662 721,686.244 35.00 4,347.47 -25.02 4,037.11 1,81279 5,933,591.624 721,687.128 35.00 4,350.55 -23.98 4,057.54 1,815.99 5,933,612.139 721,689.737 35.00 4,371.16 -85.00 4,081.04 1,812.75 5,933,635.533 721,685.816 35.00 4,393.23 -71.78 4,100.77 1,805.12 5,933,655.031 721,677.613 35.00 4,410.81 -80.20 4,145.47 1,771.35 5,933,698.730 721,642.556 35.00 4,446.10 -53.02 4,166.17 1,746.30 5,933,716.663 721,616.915 35.00 4,460.31 -42.81 4,190.99 1,702.85 5,933,742.233 721,572.761 35.00 4,474.20 40.19 9/27/2018 11:09:00AM Page 3 COMPASS 5000 1 Build 81D BP BP Coil Tubing Report BA <ER gU_GHES .„.,m. Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-20 Project: PBU TVD Reference: Mean Sea Level Site: 16 MD Reference: Kelly Bushing I Rotary Table @ 70.00usft (NABORS 4E Well: 16-20 North Reference: True Wellbore: PLAN 16-20A Survey Calculation Method: Minimum Curvature Design: 16-20A WP02 Database: EDM RSK - Alaska PROD - ANCP1 Planned Survey MD Inc AN TVDSS NIS EIW Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (1I100usft) (usft) (°) 10,700.00 95.83 277.86 8,944.24 4,204.57 1,655.62 5,933,754424 721,525.161 35.00 4,476.27 -70.00 10,719.21 98.00 27145 8,941.92 4,206.12 1,636.63 5,933,755.420 721,506.126 35.00 4,473.30 -70.84 Start Turn .35.34 10,733.00 98.00 266.58 8,940.00 4,205.88 1,622.98 5,933,754.788 721,492.493 35.00 4,469.85 -89.62 BCGL 10,800.00 98A0 242.90 8,930.68 4,188.54 1,559.43 5,933,735.604 721,429.474 34.99 4,438.03 -88.34 10,897.21 98.00 206.54 8,917.15 4,122.34 1,491.53 5,933,667.452 721,363.538 34.99 4,357.69 -87.54 Start Turn .12.12 10,900.00 98.00 208.21 8,916.76 4,119.91 1,490.22 5,933,664.987 721,362.298 12.00 4,355.02 -89.98 10,997.21 98.00 196.42 8,903.23 4,031.01 1,453.73 5,933,575.066 721,328.416 12.00 4,260.03 -89.18 Start DLS 12.00 TFO -160.00 11,000.00 97.69 196.31 8,902.85 4,028.36 1,452.95 5,933,572.395 721,327.715 12.00 4,257.27 .150.00 11,059.24 91.00 193.89 8,898.37 3,971.36 1,437.58 5,933,514.978 721,314.013 12.00 4,198.26 -160.02 Start DLS 12.00 TFO 90.00 11,100.00 91.00 198.78 8,897.66 3,932.27 1,426.12 5,933,475.565 721,303.701 12.00 4,157.56 90.00 11,200.00 90.96 210.78 8,895.95 3,841.65 1,384.30 5,933,383.774 721,264.533 12.00 4,059.64 90.09 11,258.00 90.91 217.74 8,895.00 3,793.75 1,351.67 5,933,334.945 721,233.318 12.00 4,005.40 90.29 _ TCGL 11,300.00 90.88 222.78 8,894.34 3,761.71 1,324.54 5,933,302.133 721,207.134 12.00 3,967.88 90.40 11,400.00 90.76 234.78 8,892.91 3,695.95 1,249.47 5,933,234.209 721,134.011 12.00 3,886.27 9046 11,444.24 90.69 240.09 8,892.35 3,672.14 1,212.20 5,933,209.332 721,097.453 12.00 3,854.36 90.65 Start DLS 12.00 TFO 30.00 11,500.00 96.48 243.45 8,868.86 3,645.83 1,163.20 5,933,181.804 721,049242 12.00 3,817.25 30.00 11,598.95 106.89 249.66 8,869.00 3,607.24 1,074.47 5,933,140.451 720,961.680 12.00 3,758.84 30.21 42P 11,600.00 106.80 249.72 8,868.70 3,606.89 1,073.53 5,933,140.075 720,960.748 12.00 3,758.28 31.46 11,631.42 110.00 251.82 8,858.78 3,597.07 1,045.38 5,933,129.437 720,932.901 12.00 3,742.10 31.48 Start Turn •12.77 11,700.00 110.00 243.06 8,835.32 3,572.37 985.93 5,933,103.018 720,874.197 12.00 3,704.10 -88.50 9/27/2018 11 09:00AM Page 4 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: 16 Well: 16-20 Wellbore: PLAN 16-20A Design: 16-20A WP02 Planned Survey MD (usft) 11.700 96 42N 11 800.00 11,900.00 11,914.39 TO at 11914.39 Plan Annotations Measured Depth (usft) 10,300.00 10,355.00 10,375.00 10,405.00 10,650.61 10,719.21 10,897.21 10,997.21 11,059.24 11,444.24 11,631.42 11,914.39 BP BP Coil Tubing Report BAFER �UGHES 1E- p-, Local Coordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4E North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP7 Inc Azi TVDSS NIS EIW Northing Easting DLeg V. Sec TFace (°) (°) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) (°) 110.00 242.94 8,835.00 3,571.96 985.12 5,933,102.585 720,873405 1200. 3,703.51 -69.45 110.00 230.29 8,801.12 3,520.86 907.57 5,933,049.244 720,797.377 12.00 3,635.57 -87.83 110.00 217.52 8,766.92 3,453.30 842.54 5,932,979.819 720,734.344 12.00 3,554.59 -87.81 110.00 21568 8,762.00 3,442.44 834.48 5,932,968.733. 720,726.601 12.00 3,542.14 -89.69 Vertical Local Coordinates Depth +NI -S +EI -W (usft) (usft) (usft) Comment 8,737.38 3,990.01 1,790.04 16-20 Actual Survey - TIP 8,785.90 4,012.84 1,802.27 KOP 8,803.43 4,021,42 1,806.64 Start OLS 35.00 TFO -30.00 8,828.20 4,037.11 1,812.79 Start DLS 35.00 TFO -85.00 8,946.77 4,190.99 1,702.85 Start OLS 35.00 TFO-70.00 8,941.92 4,206.12 1,636.63 Start Turn -35.34 8,917.15 4,122.34 1,491.53 Start Tum -12.12 8,903.23 4,031.01 1,453.73 Start OILS 12.00 TFO -160.00 8,898.37 3,971.36 1,437.58 Start OILS 12.00 TFO 90.00 8,892.35 3,672.14 1,212.20 Start OILS 12.00 TFO 30.00 8,858.78 3,597.07 1,045.38 Start Turn -12.77 8,762.00 3,442.44 834.48 TO at 11914.39 9/272018 11:09:00AM Page 5 COMPASS 50001 Build 81D North America - ALASKA - BP PBU 16 16-20 PLAN 16-20A 16-20A WP02 Anticollision Summary Report 27 September, 2018 BA ER BAT a GE company Company: North America - ALASKA - BP Project: PBU Reference Site: 16 Site Error: O.00usft Reference Well: 1&20 Well Error: O.00usft Reference Wellbore PLAN 1&20A Reference Design: 16-20A WP02 BP BA, �(ER Anticollision Report UGHES GE company Local Co-ordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4ES) Norm Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference 16-20A WP02 Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,300.00 to 11,914.39usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,388.29usft Error Surface: Elliptical Conic Survey Tool Program Date 9/27/2018 From To (usft) (usft) Survey (Wellbore) Tool Name 100.00 10,300.00 1 . Sperry -Sun BOSS gyro multi (1&20) BOSS -GYRO 10,300.00 11,914.39 16-20A WP02 (PLAN 16-20A) MWD Description Sperry -Sun BOSS gyro multishot MWD - Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) 16 16-01 - 16-01 - 16-01 Out of range 16-02 - 16-02 - 1&02 Out of range 16-04 - 16-04 - 16-04 Out of range 16-04 - 16-04A - 16-04A Out of range 16-05 - 18-05A - 16-05A Out of range 1&05- 16 -OSA- Plan #3 Out of range 16-13-16-13-1&13 10,750.00 10,800.00 1,211.62 1,033.30 614.43 Pass - Major Risk 16-13-16-13PB1-16-131301 10,750.00 10,800.00 1,211.62 1,033.30 614.43 Pass - Major Risk 16-13 - 16-13PB2 - 16-13PB2 10,750.00 10,800.00 1,211.62 1,033.46 614.28 Pass - Major Risk 16 -14 -16 -14A -16-14A 11,881.90 10,600.00 298.91 6.28 298.54 Pass - Minor 1110 1&14-1&148-1&148 10,859.52 11,575.00 143.33 3.44 142.96 Pass - Minor 1/10 16-14 - PLAN 16-14C - 1 &14C WP04 Out of range 16-19 - 16-19 - 16-19 Out of range 1&20-16-20-1&20 10,325.00 10,325.00 0.00 0.00 0.00 Pass-NOERRORS 16-21 - 16-21 - 1&21 Out of range 16-21 - 16-21A- 16-21A Out of range 16-22 - 16-22 - 16-22 Out of range 16-24 - 16-24 - 16-24 Out of range 16-27 - 16-27 - 16-27 Out of range 16-27 - 76-27A - 16-27A Out of range 16-27 - 16-27APBI - 16-27AP81 Out of range 16-30 - 16-30 - 16-30 Out of range 9/272018 10:55: 24AM Page 2 of 3 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Reference Site: 16 Site Error: 0oousft Reference Well: 16-20 Well Error: O.00ustt Reference Wellbore PLAN 16-20A Reference Design: 16-20A WP02 r BP BAT �(ER Anticollision Report UGHES ccromo.,�y Local Coordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4ES) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum leference Depths are relative to Kelly Bushing / Rotary Table @ Coordinates are relative to 16-20 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 - OGP-Use AK lentral Meridian is 150' 0'0.000 W ° Grid Convergence at Surface is: 1.67° Ladder Plot ----------- i 0 2000 4000 6000 8000 1 Measured Depth (2000 us1Vn) $ 16-05,16-05,16-05V1 $ 16-13,16-13PB1,16-13PB1 VO $ 16-27,16-27A,16-27AV1 -*f 16-05,16-05A, 16-0SA V5 $ 16-14,16-14,16-14 V10 $ 16-27,16-27,16-27V1 -� 16-05,16-05A, Plan #3 V1 $ 16-14,16-14A, 16-14AV11 $ 16-27,16-27APB1, 16-27APBI V1 -} 16-23,16-23,16-23 V1 -ate 16-14,16-14B, 16-14B V5 -jf 16-17,16-17A, 16-17A VO $ 16-23,16-23A, 16-23A V4 16-14, PLAN 16-14C, 16-14C WP04 VO -IIS 16-17,16-17,16-17 V1 $ 16-23,16-23APB1, Plan 16-23AWpO5V1 $ 16-18,16-18,16-18\11 -4- 16-30,16-30,16-30 Vl $ 16-23,16-23APB1, 16-23APB1 V10 $ 16-20,16-20,16-20\11 $ 16-04,16-04,16-04V1 -W 16-01,16-01,16-01 V2 $ 16-21,16-21A,16-21AVO $ 16-04,16-04A,16-04AV1 -&- 16-03,16.03,16-03 VI -jF 16-21,16-21,16-21 VI $ 16-19,16-19,16-19 V1 12000 91272016 Io5524AM Page 3 of COMPASS 5000.1 Build BID WELL DETNLS'. 16-20 GmundLeM 38.10 +W-9 V.w NorNing EaMng L aau0e Louglwtle 0.00 0.0 5929503800 719992.800 70°12'3552114 14W1333d53W WELLBORE OEFAIL& PIAN 162M Project: PBD am.a.minewm waasxmNar. caa'arece MAlreelerenm wet tbx, rmalMA Eta.; 16 Va WlRm MaS by Well: 1620 Wellbore: PLAN 16-20A MN FN seagm s]4nsm n'wuliirzoi M®6ue)L0u RekrmK6ry9wAnp1%4iBM 70 Wua(NIBW61Eb) Plan; 162MWP021162WPLAN 162441 vaa ewMml WELL DETNLS'. 16-20 GmundLeM 38.10 +W-9 V.w NorNing EaMng L aau0e Louglwtle 0.00 0.0 5929503800 719992.800 70°12'3552114 14W1333d53W WELLBORE OEFAIL& PIAN 162M REF RENOENpa84lATIM 16200 caa'arece MAlreelerenm wet tbx, rmalMA SE(:1 roNLt IAILS Va WlRm MaS Parent11 Nion(Ralewm 913-IJ004,00 Uln MorDe:I 030000 M®6ue)L0u RekrmK6ry9wAnp1%4iBM 70 Wua(NIBW61Eb) Inc cawlaom 3aRnae. ummmcumelre 4500 44W 4300 z00 �41w 0 04000 "*u 0 35M &: 4UAN'Po3 3400 Ib20AT4 3300 9/14) n 16444 Fault 3700 2500 3100 500 600 700 900 WHO IWO 1100 1200 1300 1400 1500 IWO 17W 1800 1900 2 r1%- - WO 2100 2200 1300 Wesl(•)/Easl(+) ((00 ustl/in) ar'. tl6Mi 16-20A WP02 p a]Un ..AT4 9131. IT)al 1191439 I1M' p 1u� ]'1 Lnn.JT IWti 11.nn wma- t sov a 9wrms350nrinauae pa.w. 14-bA D 161.A 17 1mtnL53suuno-X500 m lbNA r1 j .54NIum-12 77 j a9su: awmiu ntiu3yU3uuu AurtmsuwlFu-l.. F 1 Yun Tum -15'A 91xw sl,rrtn.s lxW7F119obp SW1nm-1x 1x .,[,I 815.c wo-wuu 911141 91 u11 p p y MeanM L)350 1100 335u 14W 34. 3500 3550 36M 3650 1]00 3150 3auu 3850 11cu 5950 JWu 4041 4100 41511 42M 42M 4319) 13.141 441p 4450 13 J0 '4550 4Wu 46y 4100 475u <1eW Ja50 4%U 495" 5Wu 51150 SIW 5150 Vertical Section at 13.63° (50 us0/in) -1 SE(:1 roNLt IAILS ANNOTATIDNS Sec MD Inc Azi MND +NPS -UW Oleg, TFace VSed Target TVD MD Annolalion 1 10300.00 28.17 2850 873730 399001 1790.04 000 000 4299A2 8737 38 10300 00 1620 Actual Survey -TIP 2 1D35500 28.01 2799 0785.90 401284 180217 0.60 -11939 432440 87859010355.00 KOP 3 1037500 2950 2607 8803A3 402142 183664 9.00 3000 433385 B803 43 10375,00 SIMMS 3500 TRO -3000 4 10405.00 3900 1774 802820 4037.11 1812.79 35.00 3000 435055 8828 20 10405 00 StadDLS35.00TFO-8500 5 10650.61 90.00 294.16 894677 419099 170285 3500 85.00 447420 8946771065061 StadDLS3590TFO 4000 6 1071921 9800 27145 094192 4206.12 163663 35.00 4000 4473.30 8941921071921 Slarl Turn -35.34 7 10897.21 98DD 20854 8917.15 412234 1491.53 3500 -90.00 4357.69 8917151089721 SIaNTurn 12.12 8 1D997,21 9800 196.42 890323 403101 1453.73 1200 -90.00 426003 89032310997.21 StatDLS120070-16000 9 1105924 9100 19389 889837 3971.36 1437.50 120D -16000 419826 8898 37 11059,24 Sta0DLS 1200 TFO90.00 10 1144424 9069 240.09 869235 3672.14 121220 12.00 90.00 3854.36 8892351144424 Stat XS 1200 TFO 30.00 11 11631.42 11000 25182 8850]8 359707 1045.38 1200 3000 374210 8858 7811631 A2 StartTum-1277 12 11914.39 110.00 215.68 876200 3442.44 83448 12.00 -90.00 3542.14 8762001191439 TD at 1191439 4500 44W 4300 z00 �41w 0 04000 "*u 0 35M &: 4UAN'Po3 3400 Ib20AT4 3300 9/14) n 16444 Fault 3700 2500 3100 500 600 700 900 WHO IWO 1100 1200 1300 1400 1500 IWO 17W 1800 1900 2 r1%- - WO 2100 2200 1300 Wesl(•)/Easl(+) ((00 ustl/in) ar'. tl6Mi 16-20A WP02 p a]Un ..AT4 9131. IT)al 1191439 I1M' p 1u� ]'1 Lnn.JT IWti 11.nn wma- t sov a 9wrms350nrinauae pa.w. 14-bA D 161.A 17 1mtnL53suuno-X500 m lbNA r1 j .54NIum-12 77 j a9su: awmiu ntiu3yU3uuu AurtmsuwlFu-l.. F 1 Yun Tum -15'A 91xw sl,rrtn.s lxW7F119obp SW1nm-1x 1x .,[,I 815.c wo-wuu 911141 91 u11 p p y MeanM L)350 1100 335u 14W 34. 3500 3550 36M 3650 1]00 3150 3auu 3850 11cu 5950 JWu 4041 4100 41511 42M 42M 4319) 13.141 441p 4450 13 J0 '4550 4Wu 46y 4100 475u <1eW Ja50 4%U 495" 5Wu 51150 SIW 5150 Vertical Section at 13.63° (50 us0/in) -1 0 AN COLLIMON SETTINGS Pmlaccr: Pau SR. : 16 bp Y Well; Well: ,6M DepM Range Fram: 10300.00 To 1t914.39 Wellbore: Pl 111F20A Reseal Linnand By: CeMre Distance: 138339 Plan: 1G -20A WP02(16-201PUN 1Gd0A) 0 AN COLLIMON SETTINGS COMPANY DETAILS: Nadh Ammiea-ALASKA-BP Inlerpola"n Me0ned: MD. raleval: 25.00 CalwbtiOn McMod: Mlninuen CunlMure DepM Range Fram: 10300.00 To 1t914.39 Emor System: ISON/SA Reseal Linnand By: CeMre Distance: 138339 Scan MHOed: Tree Cylinder Nodin Reference: Hen: 1620AWP0£(1620,PLAN I6 -20A) Error Soma: E%pacalCOnic - 16-03, Warning Method: Rules eased Ladder Plot Possible Magnetic Interference from: J6-20 KOP to 10,520'MID i6-20 fOi1 V 4 A O O e0i qI Oce iD b O O O o N N O O o O 0ce 0 O O N 0 0 0 o O O o 0 0 N o a 0 o 0 0 Measured Depth 00 W O N o 0 0 0 N O N 00 0 0 0 - ISO,, 16-05, 16-05 V1 -1601,1601, 1&01 W • 16-14, 16-148, 16-149 V5 - 16@,16-0; 16A2 V1 .1&04, 1601, 1694 V1 - 1605, 1605A 1605AV5 - 16-03, 1603, 1693 V1 • 16-14, PLAN 1&14C,16140 WP04 VO • 1637, 1627A 16-27A VI 1&W, 1694A 16-0 A V1 • 16-05, 1"SA, Plan e3 V1 -1&13, 1&13, 16-13 V1 - 1E1d 16-18, 1618 V1 • 1627, 1637, 1&27 Vt -1619, 16-19, 18-19 V1 1623, 1623, 1623 V1 • 16-13, 16-13PB2, 16-13P82 W • 1&2II, 16-20 1620 V1 - 16-27, 16-27APB1, 1627AFB1 V1 -16-24. 1624, 16-24 W 16-23,1&23A, 1623AV4 16-13. 1613PB1. 16-13FBt W -16,21.16-21A 1621A W . 1617, 16-17A 1&17AVO s 1&20A WW2 . 1633, 16334PB1, Ran 16-23AW05 V1. 1614. 1114. 16-14 V10 1831. 1&21, 1621 Vt . 1617, 1617, 1&17 V1 • 1623, 1623APS1, 16-23APB1 V10 - 1614,1&14A, 16-14AWI 16-22 16-22, I&M V1 1630,1&30,16 V1 �ER F UHES a U c"pa vy From Colour To MD 10300 -10520 10520 10600 10600 11100 11100- 11500 11500 11914 Project: PBU !•..•� Site: 16 (J �-J Well: 0 16.20 Wellbore: PLAN16.20A Plan: 16-20A WP02 (16.20/PLAN 16-20A) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 103002) To 11914.39 Error System: ISCWSA Results Limited By: Centre Distance: 1388.29 Scan Method: Trov. Cylinder North Reference: Plan: 16-20A WP02 (1620/PLAN 16-20A) Error Surface: Elliptical Conic Mmina Method: Rules Bash BA ER F UGHES .Nrs .riw N..I.e D. L .1. uo.onue. Depth Range: 10300.00 Toll From Colour ToMIDnag a59 sy . i199yi 0 re 1210IN l r vlaw lnsnn 1nR�n 1]90.04 0.00 0.00 4299.42 1802.27 0.60 -119.39 4324.40 1806.64 9.00 -30.00 4333.05 1812.79 35.00 -30.00 4350.55 1702,95 35.00 -05.00 4474.20 153663 35.00 -70,00 4473.30 149153 35.00 -90.00 4357.89 1453.73 1200. -90.00425003 1437.50 1200 -160.00 41MM 1212.20 12.00 90.00 3854.36 1045.38 12.00 30.00 3742.10 834.48 12.00 -90.00 3542.14 9JRYETPRJGRM3 Dep6 rrom o.q!' is 6wwFW ]ool loom Imoo.ao 1'. 3Pery-4n 9O90Npom�4 n6AI eoss.Gv1:0 10]99.) 1191439 162WVPo](MlS11620A MYN Azimuth from North7enre o Centre Separation I o uSl llln161] 141YB1,1613PB1 W .1610 16 p ibi9 V' ��l vs Centre tCtSaratio P J77 180 Azimuthfmm Nonhl°Ivs Centmto Centre Sepamlion[40usffinl m.s.nr NMFM meNxmn:1712. Ns sms7l s n tat, M e 11.a .4saYeMAle WELLBORE DETAILS: PLAN 1620A Proje PBU bysell: 1a h' e: Wdl: 16T0 1620 Parent1e WWbora: PLAN I6TOA T2 d1MD: 10300,00L°pNRebema mMD: Plan: i9•ELl WPUTPIus60011 MD (16TORLAN 16TOA) m.s.nr NMFM meNxmn:1712. Ns sms7l s n tat, M e 11.a .4saYeMAle WELLBORE DETAILS: PLAN 1620A ra;EEr�xcENraflnwncx 1620A Loa6rem Mhlflaas'em. VVWWN.T.Na VxkYIM))flMnmu. Mem10 1620 Parent1e axponryal ReMmm. .0 Nax,/Rolm T2 d1MD: 10300,00L°pNRebema mMD: KWkast NdeaisflnplflNryisWN@]0[Nefl(NPPCPSIES) LYaMem MUYM. MnmimLurvelue BAER UGHES tasting (lu0 usmml Mean Sea Level North America - ALASKA - BP PBU 16 16-20 PLAN 16-20A 16-20A WP02 Plus 500ft MD AOGCC Offset Well Report 27 September, 2018 (00 BAIUGHES AT GE company Company: North America -ALASKA - BP Project: PBU Reference Site: 16 Site Error: O.00usft Reference Well: 16-20 Well Error: O.00usft Reference Wellbore PLAN 16-20A Reference Design: 16-20A WP02 Plus 500ft MD BP ER Anticollision Report F UGHES GE rdnpany Local Co-ordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4ES) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP7 Offset TVD Reference: Offset Datum Reference 16-20A WP02 Plus 50Dft MD Centre to Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria Centre Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,300.00 to 12,414.39usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 9/27/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,300.00 1 . Sperry -Sun BOSS gym mufti (16-20) BOSS -GYRO Sperry -Sun BOSS gyro multishot 10,300.00 12,414.39 16-20A WP02 Plus 500ft MD (PLAN 16-20 MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design 16 16-14-16-148-16-14B 16-20 - PLAN 16-20A - 16-20A WP02 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) lush) 10, 886.90 11, 525.00 148.52 11,914.39 11,914.39 0.00 9272018 11:17:27AM Page 2 of 7 COMPASS 5000.1 Build 81D BP Anticollision Report Company: North Amenca- ALASKA - BP Local Co-ordinate Reference: Project: PBU TVD Reference: Reference Site: 16 MD Reference: Site Error: O.00usft North Reference: Reference Well: 16-20 Survey Calculation Method: Well Error: 0.00usft Output errors are at Reference Wellbore PLAN 16-20A Database: Reference Design: 16-20A WP02 Plus 500ft MD Offset TVD Reference: Offset Design 16 - 16-14 - 16-148 - 16-14B Survey Program: 101-CiY0-CT-CMS, acffiGY04T-CMS, 9542 -MWD, 991641 I WR•M&WOCA ftelereaEe Oflsel Measured Veni=l Measured VerMal gheeWllbore Centre Ceneero DaM6 Nw Gepth IlepM w -S BEIM Cenlre IPare luaftl (uaft) luaftl lean) (usft) (usft) 10,775.00 8934.15 11,750.00 8984.80 4368.31 1,52201 107.51 10,78376 0,932.94 11,72500 8,984.07 4,34896 Ism 19 175.74 10000.00 8,930.67 1170000 8.983.33 4,329.63 1490.35 165.68 10.0%.69 8,929.74 11,87500 8.962.69 4,310.36 1,47444 157.10 10,81822 8,92800 11650.00 8,982.14 4,291,13 1458.47 15061 10,832.31 0,926.18 11625.00 0,98170 4,271.96 144243 146.14 10,850.00 0,923.71 11,600.00 8,98142 4.252.00 1426.37 14384 10.859.52 8922.39 11,57500 8,98134 423360 1410.36 14333 10.87500 0,92023 11,550.00 8,98148 4214.35 1.394.41 14496 10.888.90 8.910.58 11,52500 0.981.83 4,195% 137851 14852 10.90000 8,916.75 11$00.00 0,98225 4,175.74 1382.65 15369 10,92004 0,913.96 11475.00 8,982.67 4,156.41 1,348.81 160.38 10,938.29 0.91142 11,45000 8,981.08 4,137.% 1,330.99 16769 10,956.13 8,90894 11.425.00 8.903.49 4,117,70 1,315.17 17581 10,975.00 8,9%31 11400.00 8,903.85 4,09847 1.299.20 18486 10,99049 8,904.15 11,375.00 8.984.16 4,079.37 1,283.07 194.82 11.61643 8,86371 10.90000 0,99284 3,720.92 97159 1%25 1163387 8.857.94 10,874.94 8,9043 3,701.54 96571 19256 11,85000 8.05242 10,850.00 8.9%.% 3,682.17 94000 19027 11,68833 8.846.83 10,02500 8.994.38 3,662]4 92420 18942 11,80345 8840.97 10.800.00 8994.67 3643.27 90060 108.93 11700.00 8,835.31 10,775.00 8994.87 3,6M 76 892.96 19169 11719.44 6.82866 10,75000 8,995.11 3,60,113 877.48 19659 11,738.14 8.8026 10.72500 8.9%.44 3584.30 %2.17 198.56 BAF�UGHES GE <d p Well 16-20 Mean Sea Level Kelly Bushing / Rotary Table Q 70.00usft (NABORS 4ES) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum 912712018 11:17:27AM Page 3 of 7 COMPASS 5000.1 Budd 61D Company: North America -ALASKA - BP Project: PBU Reference Site: 16 Site Error: 0,00usR Reference Well: 16-20 Well Error: 0 oousft Reference Wellbore PLAN 16-20A Reference Design: 16-20A WP02 Plus 500ft MD BP BIER Anticollision Report BIER GE company Local Co-ordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4ES) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP7 Offset TVD Reference: Offset Datum Offset Design 16 - 16-20 - 16-20 - 16-20 survey Pro,..: IMBOSS-GYRO Rehre.e Chet. Me4sure4 Venlcal Measured Ver6c41 De4et Wellbore cemre centre to Depth Depth Depth Depth eNs eV4 Co.. lu4ftl (..ft) (usm lusm lusm lusft) lean) 10,32500 875943 1032500 8,75943 4,000.39 1.79564 000 10,350.00 8]8149 10,WDD0 8,78148 4.010.76 1,801.17 000 10.374.99 8.80342 10.375.00 8,803.57 4,021.14 1,am65 0.32 10.399.63 8823.90 10,400.00 8,82566 4.031.52 1.012.06 2.98 10,4M45 8842.46 10.42500 8,847.73 4,04198 1.81738 884 10,446.12 B, 059.54 10,45000 8,869.74 4,052.52 1.822.60 16.M 10,,16683 8874.49 10,475.00 8,891.70 4,06343 1,82771 2632 10485.35 8.887.11 10,50000 0,913.59 4,074.41 1,83271 38.62 1050000 8.896.49 10,525.00 8,93543 4,085.53 183754 52.97 10.51580 890591 10.55000 8,95723 4,01an 1,542.51 6898 10.525.00 891103 10,57500 8,97897 4,108.13 1.847.34 88.50 10,538.75 8,918.13 10,600.00 9,000.66 4,11960 tau 11 104.99 10,550.00 8.92343 10,625.M %DM 35 4,131.11 1,856.83 12454 10,55606 8.926.08 10,65000 9844.07 4,142.57 1,861.50 14482 10.583.11 0,92898 10,87500 9.065.83 4.153.99 1,868.10 16579 10.57500 8,93340 10.700.00 9.08762 4,165.37 1870.65 18745 9/27/2018 11:17.27AM Page 4 of 7 COMPASS 5000.1 Build 8 t Company: North America - ALASKA - BP Project: PBU Reference Site: 16 Site Error: 0.0ousft Reference Well: 16-20 Well Error: 0.00usft Reference Wellbore PLAN 16-20A Reference Design: 16-20A WP02 Plus 5001[ MD BP A Anticollision Report B1TYEGHE$R 1 aGE company Local Coordinate Reference: Well 16-20 TVD Reference: Mean Sea Level MO Reference: Kelly Bushing / Rotary Table Q? 70.00usft (NABORS 4ES) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP7 Offset TVD Reference: Offset Datum Offset Design 16 - 16-20 - PLAN 16-20A- 16-20A WP02 survey Program: )008056 GYR0. 103MMM Reler¢npe met Measured Vertiedl Measured Vertical greet Wellbore Centre centmto Depth Depth Depth Depth ANIS •V M Centre teen) lusa) (oan) (urn) leen) (usft) (u.n) 10.300.00 0.737H 10.300.00 873730 3,990.01 1)90.04 000 10325.00 8]59.43 10,325.00 8,759.43 4,000,39 1,795 64 000 10,350.00 0.781.49 10,350.00 0.70149 4,010.76 1,801.17 0.00 10,375.00 0.003.43 1037500 8,803.43 4.02142 1,806.54 0.00 1040.00 8824.27 10400.00 8.824.27 4031.17 1.011.82 000 10.425.00 8,843.64 10,42500 8,843.64 4,04952 1,815.48 000 10.00 .0 8,062.40 10.45000 8,86240 4066.00 1.815.60 00 10,47500 8,8W.15 10,475.00 800015 4,083.22 1,81212 000 10,500.00 889849 10.500.00 8696.49 4,10.77 1.805.12 000 10,525.00 8.91103 10.52500 0,91103 4,11824 1741.76 0.00 10,550.00 0,92343 10,550.0 8923.43 4,13522 178139 000 10,5750 0,933.40 1057500 8933.40 4,15132 176501 000 10.800.0 0,94072 10,60.0 8,94072 4,166.17 1,746.30 0.0 10.625.0 8945.21 10.62500 8,94511 4,17841 172561 000 10,6500 891897 10.65000 0,946.7] 4,190.74 1,7041 000 10,675.00 8946.15 10,675.00 8946.15 4.199.39 1.67990 0.00 10,700.00 8.94,1.24 10.700.00 sW 24 4.204.57 1,65562 0.00 10725.00 8,941.12 1072500 8.941.12 4206.16 1,630.0 0.00 10.750.00 8,937.64 107W.0 8.937.64 4201.0 1,800.28 OW 1077500 0,934.15 10,7/500 Best 15 4,198 09 1,582.24 00 10.800.0 893367 10,9)00 893067 4,108.54 1.55943 OW 10,825.00 6,927.19 10.82500 8927.19 4,17551 1.53834 0.00 10,850.00 8923.71 10850.00 8923.71 4,15960 1.51949 0.00 10875.00 0.920.23 10,875.00 8sM 23 4,140.80 1,50333 0.00 10.90.00 8,918.75 10,90.00 8,91675 4,119.91 1490.22 0.00 10925.0 0,913.27 10050 8.913.27 4,097.79 1,479.10 0.0 10,950.0 090979 10,9500 8.90]9 4,075.12 1,40 .16 00 10,975.0 0.906.31 10,9750 890.31 4,051,95 1.,160 44 0.0 11.000.00 890281 11.000.00 0,902.84 4,028.36 1,452.95 000 11,025.00 8,900.11 11.025.00 8900.11 4,004.45 1.446.19 000 11,050.00 0.89060 11.05000 8,998.60 3.980.32 1439.03 0.00 11,7500 0,890.00 11,0750 8.899.08 3.956.13 1433.55 0.00 11,10.0 0,09765 11,10.0 8,89765 393227 1426.13 00 11.125W 089721 1112500 8,097.21 390802 141746 0.0 11150.00 8,896.78 1115000 0,896.78 388506 1,40.59 0.0 11175.00 sees 36 1117500 0,OWN 386345 1,390.52 00 11200.00 8,895.94 1120000 8,09594 3.04165 135430 000 11.22500 8895.52 11225.00 8895.52 3,820.52 137095 0.00 11.250.0 8,895.11 1126.0 8.895.11 3.500 12 1,356.51 0.00 11.2750 0,094.72 11,2750 8894.72 3,780.50 134103 o.0 11,3000 8894.33 11.300.0 8894.33 3,76171 132454 00 11.32500 0.893.95 11.32500 8093.95 3,743.82 1,307 09 000 11,350.00 8.8059 11,35000 8,093.59 372685 1,280.73 0.00 11375.00 8,893.24 11,37500 8,89324 3.710.09 1,269.50 0.00 1140.00 8892.90 11,40.00 8.892.90 3,805.95 1,24947 000 114250 0,092.56 114250 8.892.50 3,882.7 1,22&68 00 1145000 8.892.24 1145000 8,09224 3,869.29 1.207,20 00 11,475.00 8.891.11 11.475.00 8891.11 3657.25 1,185.32 00 9/27/2018 11:17.27AM Page 5 of 7 COMPASS 5000.1 Build 81D BP Anticollision Report Company: North America -ALASKA - BP Local Coordinate Reference: Project: PBU TVD Reference: Reference Site: 16 MD Reference: Site Error: O.00usft North Reference: Reference Well: 1620 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore PLAN 16-20A Database: Reference Design: 16-20A WP02 Plus 500ft MD Offset TVD Reference: BAF�UGHES a GE company Well 1620 Mean Sea Level Kelly Bushing / Rotary Table @ 70.00usft (NABORS 4ES) True Minimum Curvature 1 Do sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design 16- 16 -20 -PLAN 16 -20A -16-20A WP02 Survey Program: 10080SS,GVR0, 10 140 Reference Offset Measured Vertical Measured Verfical OffsetMebore Centre Centre to Depth Depth Depth Depth eW4 4E1*1 cent. hush) (.01) (ush) (ueffl (usal lust lush) 11,50000 0,080.85 11 ,500 00 8,880.85 364583 1,163.20 0.00 11.525.00 8,885.0 11.52500 8,08547 3.635.0 1,140.90 0 G 11.550.00 8,88097 11,550.00 8880.97 3,624.96 1,118.48 000 11,575.00 8,87537 11,57500 0,87537 3,615.% 1,098.00 0.00 11,600 00 8.8069 11,800.00 ease 69 3,606.90 1.073.53 000 11,62500 8,86.93 11,62500 8,060.93 3,598.98 1,051.12 0Do 1185000 8,852.42 11.85000 8,05242 3,59120 1,020.91 06 11,675.00 8,84388 11.675.00 8,84186 3.582.43 1,007.16 0.00 11,700.00 0.83531 11,700.00 8,03531 3.5827 905.93 0.00 11,72500 8,826.76 11,72500 a828.76 3.561.15 96530 0.00 11 750,00 8,818.21 11 750M sale 21 3,540.00 84532 0.00 11.775M 8,80965 11,]950 8,80965 3,53536 92008 06 11,800.00 e801.10 11800.00 0,801.10 3,520.86 90.50 06 11,825.00 0]92.55 1182500 8]92.55 3,50536 889.93 000 11,850.0 0,7840 11,050.00 8,784.00 3.468.89 873.18 000 11,075.00 8,77544 11.075.00 8,77544 3.01.52 057.37 0.00 1190.00 8)68.89 11.90.0 0]66.89 3.453.30 64255 00D 11,91439 Vin 97 11,91439 9.76197 3,442.44 83440 0.00 9/27/2018 11: 17:27AM Page 6 of 7 COMPASS 5000.1 Build 81D Company: North America -ALASKA - BP Project: PBU Reference Site: 16 Site Error: 0.00usft Reference Well: 16-20 Well Error: 0.00usft Reference Wellbore PLAN 16-20A Reference Design: 16-20A WP02 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: WER J"a GE ES Well 16-20 Mean Sea Level Kelly Bushing / Rotary Table Q 70.00usft (NABORS 4ES) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to Kelly Bushing / Rotary Table Q Coordinates are relative to: 16-20 Offset Depths are relative to Offset Datum Coordinate System is Alaska NA027 State Plane Zones, NAD27' OGP-Use AK Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.67° 9/27/2016 11. 17:27AM Page 7 of 7 COMPASS 5000. 1 Build 61D WELLFEAD= ACTUATOR= KB. ELB/ = BF ELS/ = r V MCEVOY BAKER KOP= 2900' Max Angle = M' 5600' Datum kD= 10371' Datum TVD = 81W SS. i-12 TBG, 17#, 13CR-80 VAMI .0232 bpf, D = 4.892" Tr -BACK D(T845DN D = 7 13-38' CSG 72#. L-80. D = 12: Minimum ID = 3.725" @ 10138' 4-112" OTIS XN NIPPLE 16 _2 O v (� SAFE I Y NOTES: 4-12" & 5-12 G.' CHROME TB TVD I DEVI 20' LATCH 2133' S7/2'HESXPp,D=4.882" DATE 2228• 5-72• X 4-12• XO. 10 3.956• ST MD TVD I DEVI TYPE VLV LATCH PORT DATE 6 3245 3234 16 IWG2 DOME BK 16 08/19/07 5 5330 4903 44 KBG2 DOME BK 16 08/19107 4 6654 5879 43 K8Cr2 SO BK 24 08/19/07 3 7731 6703 38 KBG-2 MY BK 0 032L04 2 8788 7530 35 KBG2 OM2" BK 0 0321A4 1 9717 8308 34 KBCr2 DMN BK 0 0321AM I 8786' I 17'X 4-1/2"BKR S-3 PROD PIOZ D - 3.875" 1 1-1/2TBG,12.6#,13CR-80VAMTOP, 9918'OM15'—j4-12-Mla6HOF- 3.1 .0152 bpf, D = 3.958" 8822' 7' X 5-12• PORTED XO. C 8944' 872'X4 -12'X0, D=3. r SGB LHR 9966' 9866' a/2• fiES X w, D = 3.81 9973' OUT OBSTRl1CTIOR D = 3.56' 9981'j I I 10018' 5-12' BOT PBRASSY, D = 7 ANGLE AT TOP P134=: 28' Q 10320' Nola: Refer to Production DB for bisID&al peri data 10036' 958' X 5-12' liOT 3-H Plfft, D =1 3.17#, L-80, .0232 bpf, D - 4.89T 10048'— 0048' OpnISW I DATE 31/8' 4 TOP TOP OF 7" LM 10178' O 12/1586 3-3/8' 10048'872' 10327 - 10387 - X 4-12• XO. D = 3.958' 71 .0152 bpf. D = 3.958• D = 8.681' 7" 0' f --I4-12' TUBfJG TAL, D = 3.958' 1' l3M TT LOGO 12/1586 8• HNTER6VELL 363-700 HEX PLUG (12/10/17) SLM FISH - 8 - Y PECPS OF HB( PLUG SLIPS & 6' PECES OF HE=X PLUG SLIPS & THE ELEAM, PCS N VVEIL PC FOLDER (088'. DATE FERFORATLON SUMMARY COMMENTS REF LOO: BFCS ON 122785 12!3185 ANGLE AT TOP P134=: 28' Q 10320' Nola: Refer to Production DB for bisID&al peri data SIZE SPF NT92VAL OpnISW I DATE 31/8' 4 10320- 10394 • O 12/1586 3-3/8' 4 10327 - 10387 - O 05/05/92 318' 4 10434-10450 ' C 12115/86 3-38• 4 10462-10470. C 11/13193 D = 8.681' 7" 0' f --I4-12' TUBfJG TAL, D = 3.958' 1' l3M TT LOGO 12/1586 8• HNTER6VELL 363-700 HEX PLUG (12/10/17) SLM FISH - 8 - Y PECPS OF HB( PLUG SLIPS & 6' PECES OF HE=X PLUG SLIPS & THE ELEAM, PCS N VVEIL PC FOLDER (088'. DATE REV BY COMMENTS DATE REV BY COMMENTS 12!3185 RDWAN35 ORIGINAL COMPLETION 08108/17 BSEIAV PLLL®PART OFFISH 07113M ?? FMO 12/14/17 rrCIJMD SET HEX PLUG 03121/04 NOES RWO 04/12118 KP/JMD TT8£CIO(04AW18) 01/20108 JLWTLH LFDATE DRAWNG(X NP) 02119/08 DRM-H TfaMP 47 LFDATES 0710517 MS/JAD SET FISH (0624117) I FBH-BP VVTfH TOP BROKEN (05/10/961 1 RaDHOE BAY UNIT WB -L: 16-20 PEMM T No: -1852850 AR No: 50-02921493-00 SEr- 24, T/OT{ R15E, 2170.11' FEF & 2515.77' FtL BP 6tploratiob (Alaska) TREE= 631' CAL13 N W131FEAD= MCEVOY ACTUATOR= BAKER KB. aB/ = 70' BF. B.EV = Reler to Production 08 for Alalorkal pot date KOP= 2900' Max Angle = 44' Q 5600' Datum MD= 10371' 0&tumTVD= sew SS 5.12 TBG, 170, 13CR-00 VAM TOP, I--2228' .0232 Epf, D = 4.89Y TEmci<DnEm*N, D=7.50• 2316' 13-3/8' CSC, 7210, L -W, D=12.34T 2621• Minimum ID = 3.725" @ 10138' 4-1/2" OTIS XN NIPPLE 4-12 TBG, 12.610, 13CR-80 VAM TOP, .0152 W. D = 3.858' ITOPOF7'LNR I 15-51' CSG. 4710. L-80. D - 8.681' 1 X .0371 16— O w SAFEI Y NOTES: 4-12' 8 5-112' CHROME TBC - L H 20' 7'x S12'XO, D-4.892' 212.7' S72'HESX NP,D=4.582' 2228' S12' X 412' XO, D = 3.858' 232T BKR ZXP PKR w/ FLX LOCK LNZ HGR D=8.310' ST PERFORATION SUMMARY TVD REF LOG: SHCS ON 12/21155 TYPE A NGL E A T TOP PERF: 28• Q 10320' Note: Reler to Production 08 for Alalorkal pot date SIZE SPF NTE.RVAL O n18gz DA 1 KBG2 DONE 10320 - 103910 O 12115/58 516 3 -]IS' 4 10321 - 10381 0 03103/92 3-115' 4 10/]/ - 104s0 C t2/1 SMS 3-315• 4 10452 -land C 11113193 .0371 16— O w SAFEI Y NOTES: 4-12' 8 5-112' CHROME TBC - L H 20' 7'x S12'XO, D-4.892' 212.7' S72'HESX NP,D=4.582' 2228' S12' X 412' XO, D = 3.858' 232T BKR ZXP PKR w/ FLX LOCK LNZ HGR D=8.310' ST AU TVD I DEVI TYPE VLV LATCH PORI DATE 6 3245 32341 16 1 KBG2 DONE BK 16 08119107 5 5330 DR/1L.H 44 K3G-2 DONE BK 16 0&19/07 4 6654 43 KBG-2 SO BK 24 08/19/07 3 7731 :6703 38 KBCr2 CMY BK 0 0321104 2 8766 35 KBG-2 DMf BK 0 0321/04 1 9717 34 KBG-2 DA4Y &( 0 0321/04 DATE REV BY I COWENTS DATE FEV BY COWENTS 12!31185 ROWAN 35 ORKaNNAL COMPLETION 08/09N7 BSEMM7 PUD® PART OFFISH 0711316 7? RWO 12/14/17 JTCfJW SET HD(PLUG 03121104 NUB RNO 04/12/18 KR" TREECIO(04/08118) 01120108 XM TLH UPDATE DRAWING (X 02/19/08 DR/1L.H TRIT4W { UPDATES 07/05/17 M AU SET FISH (0624117) X 4-12• BKR S-3 PROD FK '0' OE P.OYMHNT 5LV I2'HESNP,D=3.813' 12' MLLESHOE, ID -3.9511P X 5-12' PORTED XO, D = 4. 12' X 4-12' XO, D= 3.958' 12'FE9XNP,D=3.813' 12' X 5-12' XO, D = 3.958- v 11JOlEOVBtSFDT 1/2' BOT PBR ASSY. D =? MLLOUT D(TE SKK D = 7? 12' X 4-12' XO, D= 3.958' 12' OTIS XN NP. D = 3.725' 1/2' TUSING TAIL, D- 3.958' M TT LOGGED 12/15M fyta FISH - 8 - 2' PECES OF HB( PLUG SLIPS 8 3 - 8' PECES OF HB( PLUG SLIPS 8 THE H93BNT, PICS N V1LLL PD FOLDER (08107111 PRUDHOEBAY LNT WB -L: 16-20 PERhAT No: '1852850 AR No: 50-029-21493-00 SEC 24, TIOR R75E, 2170.1 V R3 8 2515 BP Exploration (Alaska) Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 Quick Test Sub to Otis -1.1 ft - - - - --— Top of 7" Otis 0.0 ft _.--- .—.—.—.—._._. *.—.—.—.—. CL 2-3/8" Pipe/Slips 81 Kill Line CL 2-3/8" x 3-1/2" VBRs 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft Drip Pan �— 7-1116" 5k Flange X 7" Otis Box dril 7 1116" Annular B3 CL of Top Swab 16.0 ft t CL of Flow Cross CL of Master 18.8 ft LDS O IA OA LDS O Ground Level T2 Choke Line Test Pump Hose Distances from top of riser Excluding quick -test sub Top of Annular 6.0 ft Top of Annular Element 6.7ft Bottom Annular 8.0 ft CL Blind/Shears CL 2-3/8" Pipe/Slips 81 Kill Line CL 2-3/8" x 3-1/2" VBRs 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft Drip Pan �— 7-1116" 5k Flange X 7" Otis Box dril 7 1116" Annular B3 CL of Top Swab 16.0 ft t CL of Flow Cross CL of Master 18.8 ft LDS O IA OA LDS O Ground Level T2 Choke Line Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: �/'8 Development —Service Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: 40L POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50- (If last two digits _- Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - _-� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing Program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are / also required for this well: ✓/ Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 - _ Well Name: PRUDHOE BAY UNIT 16-2.OA _ Program DEV_ _ Well bore seg ❑ PTD#:2181180 Company BP EXPLORATION_(ALAS INC. _ _. _ _ ._ Initial Class/Type _ DEV/ PEND GeoArea 890__ _ Unit !IUQ_On/Off Shore DA- Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31,05.030Q.1. A) (y2.A-D) _ _ NA 1 Permit fee attached- - _ - _ _ - - NA - 2 Lease number appropriate.. _ .. _ _ _ .. Yes Entire Well lies within ADL0028332. 3 Unique well name and number _ _ _ ... _ _ _ _ Yes 4 Well located in a. defined pool- _ _ - - _ - _ _ _ - _ _ Yes - PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341E 5 Well located proper distance from drilling unit boundary - _ _ _ Yes CO 341F, Rule 2:. There shall be no restrictions as to well. spacing. except that. no pay shall be - 6 Well located proper distance from other wells - - - _ _ _ _ _ Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to 7 Sufficient acreageavailablein. drilling unit _ _ - - Yes CO 341 F, Rule 2.... 8 If ..deviated, is. wellbore plat included - - - - - - - - - - - - - - - - - - - _ - Yes 9 Operator only affected party..... . . .. . . . ...... . . . . Yes 10 Operator has appropriate bond in force _ _ _ _ _ _ _ _ _ _ _ Yes Appr Date 11 Permit can be issued without conservation order. _ _ _ _ _ _ .. _ Yes SFD 10/2/2018 12 Permit can be issued without administrative -approval _ _ _ .. ..... Yes ... 13 Can permit be approved before 15 -day wait_ _ _ _ _ _ _ _ _ _ _ _ _ Yes 14 Well located within area and strata authorized by Injection Order # (put. 10# in.. comments) (For. NA. 15 All wellswithin1/4 mile.ama.of review identified (For service well only) - - - _ .. .... _ NA 16 Pre -produced injector: duration of pre production less than 3 months(Forservice well only) NA_ 18 Conductor string. provided - . NA ... Redrill out of existing production tubing.. Engineering 19 Surface casing. protects all.known USDWs - - - - _ .. ... NA _ CTD sidetrack from existing. production tubing. 20 CMT vol adequate to circulate -on conductor & surf.csg - - - - ---- - - - - - - -- - - - - - NA.. _ _ _ - CTD sidetrack. from existing production tubing.. _ _ _ _ _ 21 CMT vol adequate to tie-in tong string to surf csg_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ - - - CTD sidetrack from existing production tubing I22 CMT will cover. all known productive horizons . . . ...... . . . ... . . . . . .. _ _ Yes - - _ Fully cemented across- production hole 23 Casing designs adequate for C, T, B &, permafrost _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - 24 Adequate tankage or reserve Pit _ _ .. _ _ _ _ _ _ _ _ _ _ _ _ Yes _ ....... 25 If a re -drill, has, a 10003 for abandonment been approved _ _ _ _ _ _ _ _ _ _ _ _ Yes _ Sundry 318-371- 26 Adequate wellbore separationproposed- - _ - - - .. _ _ _ Yes _ _ - Anticollision shows -no anti collision risk failures 27 If.diverter required, does it meet regulations, . . . . . . . . ... . . . ..... . .... NA- _ _ No drilling on diverter Appr Date 28 Drilling fluid program schematic & equip list adequate_ _ _ _ - .. _ Yes - _ Reservoir pressure.at 3287 psi, -Drilling with 8.6 fluid at 723 psi overbalance MGR 10/82018 29 BOPEs do they meet regulation - - - - - - - - - - -- - - - - Yes _ .. MASP 2389 psi, Test BOPEs to -3500 psi - 30 BOPS.press rating appropriate; lest to (put prig in comments).. _ _ _ _ - _ _ Yes 31 Choke manifold complies w/API RP -53 (May 84)- - - . - - - - - _ _ _ _ _ _ _ _ Yes - - - - - - - - - - - - - - -- - - - - - 32 Work will occur without operation shutdown_ _ _ _ ... Yes - - - - - - - - 33 Is presence of H2S gas probable-- - - - -- - - - - - - - - - - - - Yes _ _ - H2$ sensors required 34 Mechanical.condition of wells within AOR verified (For service well only) _ _ _ _ NA 35 Permit can be issued w/o hydrogen sulfide measures ... _ _ _ _ .. _ _ .. _ _ _ _ No - DS 16 wells are. H2S-bearing. H2S measures are required. Geology 36 Data.presented on potential overpressure zones_ _ _ _ _ _ _ ___- -Yes _ -Ex ected reservoir pressure is 7.96 ppg EMW; will be drilled usin9.0.4 pP9 mud & coiled tubing, Appr Date 37 Seismic analysis of shallow gas. zones_ _ _ _ _ _ ..... _ _ NA .. _ _ Should higher pore. pressures be encountered, BP has immediate access to nearby fluid. mixing facilities.. SFD 10/2/2018 38 Seabed condition survey -(if off -shore) - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----- - NA 39 Contact name/phone for weekly progress reports [exploratory only] ... _ _ _ _ _ NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Co . er Date