HomeMy WebLinkAbout218-139MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, March 24, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Guy Cook
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
L2-07B
PRUDHOE BAY UN PBU L2-07B
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 03/24/2023
L2-07B
50-029-22910-02-00
218-139-0
N
SPT
8084
2181390 2021
36 2751 2655 2612
178 205 205 205
OTHER P
Guy Cook
2/5/2023
2 year CMIT- TxIA per CO 736. Testing was completed with a Little Red Services pump truck and calibrated gauges.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN PBU L2-07B
Inspection Date:
Tubing
OA
Packer Depth
619 2742 2664 2642IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitGDC230205070119
BBL Pumped:4.1 BBL Returned:3.7
Friday, March 24, 2023 Page 1 of 1
IA remedial cement; 1-Oil completion
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, February 22, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
L2-07B
PRUDHOE BAY UN PBU L2-07B
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 02/22/2023
L2-07B
50-029-22910-02-00
218-139-0
N
SPT
8084
2181390 2021
2545 2755 2712 2682
176 179 177 176
OTHER F
Austin McLeod
1/22/2023
CO736. Two year CMIT-TxIA. Bump up from previous fail.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN PBU L2-07B
Inspection Date:
Tubing
OA
Packer Depth
2545 2752 2714 2683IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM230122191000
BBL Pumped:0.5 BBL Returned:4.1
Wednesday, February 22, 2023 Page 1 of 1
(retest; see mitSAM230122185655)
1-Oil producer; IA Remedial cement squeeze
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, February 22, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
L2-07B
PRUDHOE BAY UN PBU L2-07B
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 02/22/2023
L2-07B
50-029-22910-02-00
218-139-0
N
SPT
8084
2181390 2021
468 2734 2650 2607
179 179 177 177
OTHER F
Austin McLeod
1/22/2023
CO736. Two year CMIT-TxIA. TOC TVD 5278'. Did not bleed down-bumped up. Separate report.
30 MinPretest Initial 15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:
PRUDHOE BAY UN PBU L2-07B
Inspection Date:
Tubing
OA
Packer Depth
461 2734 2650 2607IA
2569
177
45 Min
2569
60 Min
Rel Insp Num:
Insp Num:mitSAM230122185655
BBL Pumped:4.3 BBL Returned:
Wednesday, February 22, 2023 Page 1 of 1
CO736. Two year CMIT-TxIA. TOC TVD 5278'. Did not bleed down-bumped up. Separate report.
F
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, February 22, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
L2-07B
PRUDHOE BAY UN PBU L2-07B
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 02/22/2023
L2-07B
50-029-22910-02-00
218-139-0
N
SPT
8084
2181390 2021
465 2745 2633 2598
158 159 156 156
OTHER P
Austin McLeod
1/22/2023
CO736. Two year MIT-T. Plug at 10,583' MD
30 MinPretest Initial 15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:
PRUDHOE BAY UN PBU L2-07B
Inspection Date:
Tubing
OA
Packer Depth
464 588 582 574IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM230122185304
BBL Pumped:2.6 BBL Returned:2.4
Wednesday, February 22, 2023 Page 1 of 1
CO736. Two year MIT-T. Plug at 10,583' MD
MEMORANDUM
State of Alaska
Permit Number: 218-139-0
Alaska Oil and Cas Conservation Commission
TO:Jim R ^ /
rq i
DATE: Monday, February 1, 2021
\BCS
P.I. Suppervem isor Z I
SUBJECT: Mechanical Integrity Tests
Packer Depth Pretest Initial
Hilcarp North Slope, LLC
Well
L2 -07B
FROM: Adam Earl
PRUDHOE BAY UN PBU L2 -07B
Petroleum Inspector
Tubing
Sre: Inspector
2852 -
Reviewed By:.
2707
P.1. Supry �7
NON -CONFIDENTIAL
Comm
Well Name PRUDHOE BAY UN PBU L2 -07B API Well Number 50-029-22910-02-00
Inspector Name: Adam Earl
Permit Number: 218-139-0
Inspection Date: 1/3112021
IDSA Num: mitAGE210201060518
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well
L2 -07B
Type Inj
N
TVD
Tubing
454
2852 -
2744
2707
PTD
2181390
Type Test
sPT
Test psi
2590
IA
467
493
ass -
487
BBL Pumped:
2.a
BBL Returned:
2.1
OA
215
214
213
213 '
Interval OTHER p/F P ✓
--
Notes: Tubing test as per CO 736 on producing well
Monday, February 1, 2021 Page I of I
MEMORANDUM
State of Alaska
Permit Number: 218-139-0
Alaska Oil and Gas Conservation Commission
To: Jim Regg 7 �lCtil GU2�
DATE: Monday, February 1, 2021
P.I. Supervisor I`�
Q�
SUBJECT: Mechanical Integrity Tests
Packer Depth Pretest Initial
Hilcory North Slope, LLC
Well L2 -07B Type Inj N' TVD Tubing 473 2873
L2 -07B
FROM: Adam Earl
PRUDHOE BAY UN PBU L2 -07B
Petroleum Inspector
Test psi 2590 IA
467
Src: Inspector
2767
Reviewed By
P.I. Supry
NON -CONFIDENTIAL
Comm
Well Name PRUDHOE BAY UN PBU L2 -07B API Well Number 50-029-22910-02-00
Inspector Name: Adam Earl
Permit Number: 218-139-0
Inspection Date: 1/31/2021
InSp Num: mitAGE210201061647
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well L2 -07B Type Inj N' TVD Tubing 473 2873
2821 - 2797
PTD
2181390
Type Test SPT
Test psi 2590 IA
467
2864 •
2767
2744 '
BBL Pumped: 6.3 BBL Returned: 5 OA z13 zza -
z23 222
Interval OTHER P/F P ✓
- —
Notes: Combo MIT of Tubing and I/A on producing well as per CO 736
Monday, February 1, 2021 Page 1 of I
DATA SUBMITTAL COMPLIANCE REPORT
7/19/2019
Permit to Drill 2181390 Well Name/No. PRUDHOE BAY UN PBU L2 -07B rF 1-0
Operator BP Exploration (Alaska) Inc. API No. 50-029-22910-02-00
MD 13703 TVD 8640 Completion Date 4/14/2019 Completion Status 1-0I1- Current Status 1-0I1- UIC No
REQUIRED INFORMATION / / /
Mud Log No ✓ Samples No.,/ Directional Survey Yes V
DATA INFORMATION
List of
Logs Obtained: MWD / GR / RES
(from Master Well Data/Logs)
Well Log
Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OH/
Type
Med/Frmt Number Name
Scale Media No Start Stop CH Received
Comments
ED
C
30845 Digital Data
10733 13M 5/29/2019
_
Electronic Data Set, Filename: 1-2-
07B_LWD_FINAL FIELD_COMPOSITE_02APR
2019_BHI_CTK.Ias
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_GR_Res _ 02APR2019_MD_FINAL_FIELD_
BHI_CTK.cgm
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_GR_Res _ 02APR2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_GR_Res _ 02APR2019_MD_FINAL_FIELD_
BHI_CTK.pdf
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_ GR_ Res_ 02APR2019_TVDSS_FINAL_FIEL
D_BHI_CTK.pdf
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-07B Final Field Suvreys.csv
ED
C
30845 Digital Data
5/29/2019
Electronic File: L2 -07B Final Field Suvreys.xlsx
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-07B Final Survey.pdf
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-07B Final Survey.bd
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_25_tapescan_BHI_CTK.txt
ED
C
30845 Digital Data
5/29/2019
Electronic File: L2 -07B_5_ tapescan_BHI_CTK.txt
ED
C
30845 Digital Data
5/29/2019
Electronic File: L2-07B_output.tap
ED
C
30845 Digital Data
5/29/2019
Electronic File: L2-
07B_GR_Res _ 02APR2019_MD_FINAL_FIELD_
BHI CTK.tif
AOGCC
Page] of 3
Friday, July 19, 2019
DATA SUBMITTAL COMPLIANCE
REPORT
711912019
Permit to Drill
2181390 Well Name/No. PRUDHOE BAY UN PBU 1-2-07B Operator BP Exploration (Alaska)
Inc. API No. 50-029-22910-02-00
MD
13703
TVD 8640 Completion Date 4/14/2019 Completion Status 1 -OIL
Current Status 1-0I1- UIC No
ED
C
30845 Digital Data
5/29/2019
Electronic File: 1-2-
07B_GR_Res _ 02APR2019_TVDSS_FINAL_FIEL
D_BHI_CTK.tif
Log
C
30845 Log Header Scans 0 0
2181390 PRUDHOE BAY UN PBU 1-2-07B LOG
HEADERS
Log
C
30846 Log Header Scans 0 0
2181390 PRUDHOE BAY UN PBU 1-2-07B PB1
LOG HEADERS
ED
C
30846 Digital Data 10733 12409
5/29/2019
Electronic Data Set, Filename: 1-2-
07BP81_LWD FINAL FIELD_COMPOSITE_29
MAR2019_B H I_CT K.la s
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
07BPB1_GR_Res_29MAR2019_MO_FINAL_FIE
LD_BHI_CTK.cgm
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
07BPB1_GR_Res_29MAR2019_TVDSS_FINAL_
FIELD_BHI_CTK.cgm
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-
07BPB1 GR_Res_29MAR2019_MD_FINAL_FIE
LD—BHICTK.pdf
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
07BPB1_GR_Res_29MAR2019_TVDSS_FINAL_
FIELD_BHI_CTK.pdf
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-07BPB1 Field Surveys.csv
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-07BPB1 Field Surveys.xlsx
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-07BPB1 Final Survey.pdf
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-07BPB1 Final Survey.txt
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
07BPB1_25_tapescan_BHI_CTK.txt
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
07BPB 1 _5_tapescan_BHI CTK.txt
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-07BPB1_output.tap
ED
C
30846 Digital Data
5/29/2019
Electronic File: 1-2-
078PB1_GR _ Res_ 29MAR2019_MD_FINAL_FIE
LD_BHI CTK.tif
ED
C
30846 Digital Data
5/29/2019
Electronic File: L2-
07BPB1_GR_ Res_ 29MAR2019_TVDSS_FINAL_
FIELD BHI CTK.tif
AOGCC
Page 2 of 3
Friday, July 19, 2019
DATA SUBMITTAL COMPLIANCE REPORT
7/19/2019
Permit to Drill 2181390 Well NamelNo. PRUDHOE BAY UN PBU 1-2.07B Operator BP Exploration (Alaska) Inc.
MD 13703 TVD 8640 Completion Date 4/14/2019 Completion Status 1 -OIL Current Status 1-0I1
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
INFORMATION RECEIVED
OCompletion Report
Production Test InformatiorI& NA
Geologic Markers/Tops O
COMPLIANCE HISTORY
Completion Date: 4/14/2019
Release Date: 10/30/2018
Description
Comments:
Compliance Reviewed
API No. 50-029-22910.02.00
UIC No
Directional / Inclination Data D Mud Logs, Image Files, Digital Data Y /e) Core Chips Y
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Filei,jf'Y �`�//-� Core Photographs Y
Daily Operations Summary 0 Cuttings Samples �/ NA / Laboratory Analyses Y
Date
Comments
Date: 71(1 1 ( l
AOGCC' Page 3 of 3 Friday. July 19-2019
HUGHES=)
PRINT
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME L2 -07B
FIELD Prudhoe Bay Unit
COUNTY PRUDHOEBAY
BHI DISTRICT Alaska
DISTRIBUTION LIST
218133
30 84 5
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, LR2-1
) E. Benson Blvd.
horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR - RES
LOG DATE April 2, 2019
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider@bh.ge.com TODAYS DATE May 28, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
Be North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
3 ExxonMobil, Alaska
Attn: Lynda M. Vaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska -AOGCC
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
FIELDI
FINAL
CD/DVD
FINAL
PRELIMLOGS
(las, dlis, PDF, META,
I
SURVEY
I
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN
ur rKIN
# OF COPIES
# OF COPIES
# OF COPIES
4 4 IG A 9
1 1
RECF�V
CC
5 DNR - Division of Oil & Gas *** 'l
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Nancy Landi
TOTALS FOR THIS PAGE: 0 2 4 2 0
BAJti(LRES C PRINT DISTRIBUTION LIST
111i %J 11711
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME L2-07BPBI
FIELD Prudhoe Bav Unit
COUNTY
PRUDHOE BAY
FINAL
BHI DISTRICT
Alaska
(las, dlis, PDF, META,
AUTHORIZED BY
Patrick Rider
EMAIL
Patrick. Rider(a)bhge.com
21 81 39
30 84 6
ase sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, 1-112-1
) E. Benson Blvd.
-horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR -RES
LOG DATE March 29, 2019
TODAYS DATE May 28, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TOP 0. BOX)
PERSON ATTENTION
Ij
) BP North Slope.
EOA, PBOC, PRB-20 (Drove 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Bemon Blvd.
Anchorage, Alaska 99508
2 Conoco'hillips Alaska Inc.
Attn: Ricky Elgarico
ATO 705
700 G Street
Anchorage, AK 99501
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ...
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
" Stamp "confidential" on all material deliver, to DNR
6 BP Exploration (Alaska) Inc.
Petroteehnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Nancy Landi
FIELD FINALCD/D
VD
FINAL
PRELIM
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS LOGS
CGM, Final Surveys)
(Compass)
#OFPRINTS
#OF COPIES
#OF COPIES
#OF COPIES
4 4
Re .ejx, �
TOTALS FOR FOR THIS PAGE: 0 2 4 2 0
STATE OF ALASKA
`LASKA OIL AND GAS CONSERVATION COMMIStO—N
WELL .MPLETION OR RECOMPLETION REPOT AND LOG
'gtAVtL)
MAY X18 gniq
la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ 11WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
Developm6�11, K Expldral�orl ,1❑
r�
I
Service ❑ Stratigraphic Test ❑
2. Operator Name:
S. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
4/14/2019
218-139
3, Address:
7. Date Spudded
15- API Number: r
P.O. Box 196612 Anchorage, AK 9951 M612
3/26/2019
50-029-22910.02-00
4a. Location of Well (Governmental Section):
e. Date TO Reached.
16. Well Name and Number.
4/1/2019
PBU 1-2-07B
Surface: 1315' FSL, 3802' FEL, Sec. 18, T1IN, RISE, UM 4
9 Ref Elevations KB 39.30
17. Field/Pool(s):
Top of Productive Interval: 1290' FSL, 334V FEL, Sec. 12, T11N, R14E, UM
GL 13.37 BF 14,43
PRUDHOE SAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 1945' FSL. 1761' FEL, Sec. 12, T71N, RUE, UM
13683'/ 8641'
ADL 028321, 028307 5 028302
4b, 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11, Total Depth (MD/TVD):
19. DNR Approval Number.
Surface: x- 692844 y- 5963212 r Zone - ASP 4
13703'1 864V r
84-62
TPI: x- 688229 y- 5968351 Zone - ASP 4
12. SSSV Depth (MD/TVD):
40 Thickness of Permafrost MDTrVD:
Total Depth. x- 689791 y- 5969046 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21. Re-dnll/Laleral Top Window
MD/fVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
10924'/ 8420'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES
23. CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM
TOP
BOTTOM
20"
27' 107'
27'
107'
30"
260 sx Arctic Set (Approx.)
9-5/8"
40#
L -e0
27' 4422'
27'
3734'
12-1/4"
350 sx PF'E', 210 ax Clam'G', 1848 sx PF'E', 200 sx PF'C'
7"
26#
L-80
25' 10785'
25'
8293'
8-4/2"
552 sx Class'G'
4-1/2"
12.6#
L -e0
10590' 10924'
8120'
8420'
6"
143 sx Class 'G'
3-1/7.3-1/4"
9.3#/6.6#
L -e0
10820' 13703'
8324'
8640'
4-1/4"
155 sx Cless'G'
x2-7/8"
/6.5#
24. Open to production or injection? Yes 0 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/fVD of Top and Bottom; Perforation
Size and Number; Date Perftl):
GRADE DEPTH SET (MD) PACKER SET (MD/T/
4-1/2" 12.6111 L-80 10605' 10550'/ 8084'
2" Gun Diameter, 6 spf 4/12/2019
11876'- 12188' 8648'- 8651' ,
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
12213'- 12401' 8651'- 8648'
Was hydmulicfmctudng used during completion? Yes ❑ No 0
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
12421'- 12600' 6648' - 8648' COMPLETION
12966'- 13245' 8639' - 8643'
13278'- 13680' 8643'-8641' DATE
N ZolS
RIFT D
DEPTH IMERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
2500' Freeze Protect w/ 35 Bbls Diesel, 5 Bble MCOH
27. PRODUCTION TEST
Data First Production: Apel 21, 2019
Method of Operation (Flowing, gas lift, etc.)Flowing
Dale of Test: 425/19
Hours Tested:
Production for
Oil -Bbl:
Gas-MDF:Water-Bbl:
Choke Sue-
Gas -Oil Ratio:
8
Test Period --11-496
1213
0
176
2446
Flow Tubing 577 Casino Press: Calculated Oil-Bbl'Gas-MCF: r Water -Bbl: Oil Gravity - API (con).
Press 1121 24 Hour Rate —11-1488 3638 0 N/A
Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
�q .: 69?01 ?'Yl RBDMS-WO-zMAY 0 9 2019 pt&
28. CORE DATA Conventional Corals) Yes ❑ No IZ ( Sidewall Cores yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes No R1
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
11620'
8825' separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
CGL - Zone 3
10941'
8435'
Base of CGL - Zone 2C
11004'
8489'
23SB - Zone 2B
11093'
8553'
22TS
11249'
8600'
Zone 1 B
11340'
8604'
TDF - Zone 1A
11620'
8625'
Formation at total depth:
Zone 1A
11620'
8625'
31. List of Attachments- Summary of Daily Drilling Reports, Summary of Post -Rig Work, Surveys, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R
Authorized Title: Specialist Contact Email: Ryan.Ciolkosz@bp.com
Authorized Signature: Date: 5/b/11Contact Phone: +1 907 564 5977
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10407 welt completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated Pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and panted logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple complefion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the coresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071,
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 512017 Submit ORIGINAL Only
TRff = 4-1116• CNV
VYBLHEAD=
FMC
ACTUATOR=
CIW SH 3000
KB. ELEV =
39.3'
REP TLEV =
39.3'
BF. AEV =
MAY
KOP=
1985'
Msx Angle =
93' @ 12394'
Datura MD=
NA
Datun TVD=
8800'SS
4-12'
3-1/4'
= 8.835'
61
Minimum ID = 2.31" @ 10830'
2-7/8" X NIP IN LTP PTSA
D = 3.958'
7-
3-12' LNR. 9.3#, L-80
A087 Gpf, D = 2.992'
1/2' MONOBORENOIPSTOC
RA PP TAGS @ 1093T (12/(
12.69. L-80..0152 baf. D = -.-
12-7/8' LNR. 6.5#. L-80 STL..005B buf. D = 2.441' I
L2 -07B
PRUDHOE BAY
SAF v NOTES: W ELL ANGLE> —70° @11166'.
MA. —S:31.70@11211*.
1/2' CAMCO BAL-O SSSV NP, D = 3.813'
GAS LIFT MANDRELS
ISTI
PERFORATION
PERFORATION SUMMARY
I-TVDIDEVI
REP LOG WAO GR -WR ON 04=19
TYPE
ANGLEAT TOP PE RF: 89" @ 11876'
Note:
Refer to Production OB for historical pert data
SIZE
SPF
NTERVAL
OWSgz
DATE
2'
6
11876-12188
O
04/12/19
2"
6
12213 - 12401
O
04/12/19
2-
6
i2421 -126W
O
04/12/19
2-
6
12966 - 13245
O
04/12/19
2-
6
13278 - 13680
O
04/12/19
12-7/8' LNR. 6.5#. L-80 STL..005B buf. D = 2.441' I
L2 -07B
PRUDHOE BAY
SAF v NOTES: W ELL ANGLE> —70° @11166'.
MA. —S:31.70@11211*.
1/2' CAMCO BAL-O SSSV NP, D = 3.813'
GAS LIFT MANDRELS
ISTI
MD
I-TVDIDEVI
PRUDHOE BAY UNIT
VALL: L2 -07B
PERMIT No: 218-139
AR No: 50-029-22910-02
SM 18, T71 N, R15E, 3511.01' FEL 8 4478.5T FTL
TYPE
I VLV
ILATCHIPORT
04/21/19 MWJMD� IATOCOORIRECTED(11)25/18SCMT)
DATE
1
4089
3496
44
05/06/19 NAUJMD ADDED PERF SUMMARY LOG 8 DATE
50
Ni
20
04/19/19
'2
7758
6094
45
�KBWLLS
KBG25
01(I7'
M
0
04/21/18
'3
10401
7958
34
KBG2LS
9bPTY
—
—
11/12/18
'STA 2 8 3 = BEHND CEMENT
X 4-1/2' BAKER S-3 PKR, D =
1/2' HES X NP, D=3.813'
10590' !D = 4. 375" R ZXP R(R w
D = 4.4375'
11263'
HMC HGR
145KB LTP w/PTSA STNGE R (04/18/19). D= 2.36' 11
MLLOUT WNIDOW (L2 -07B) 10924' -10933'
PRUDHOE BAY UNIT
VALL: L2 -07B
PERMIT No: 218-139
AR No: 50-029-22910-02
SM 18, T71 N, R15E, 3511.01' FEL 8 4478.5T FTL
DATE FIE/ BY 0OW49SM
DATE REV BY OORNASM
12/11/98 ONGINAL COMPLETION
04/21/19 MWJMD� IATOCOORIRECTED(11)25/18SCMT)
0&02104 JLMIVAK CTD SIDETRACK (1-2-07A)
0422/19 R=JMD# LTPw/PTSASEr(04/18/19)
04113/19 N -CM CTDSIDETRACK(L2-078)
05/01/19 RCIJMD FNALODEAPTROVAL
0421/19 TWJMD+ DRLG DRAFT
05/06/19 NAUJMD ADDED PERF SUMMARY LOG 8 DATE
0421/19 K5-vjw54 TFiEE CIO (04/14/19)
05/08/19 RCIJMD CORRE=PBTDPHRTEN
BP Exploration (Alaska)
04/21/19 JPKIJ ADF GLV CIO (4119/19)
05/08/19 JNJJMD CORRECETD PERF DEPM DATES
Printed 5!//2019 10*14:58AM **All depths are reported in Drillers Depths"
North America - ALASKA - BP
Page 1 or 15
Operation Summary Report
Common Well Name: 1.2-07
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 3/24/2019 End Date: 4/2/2019
X3 -0196F -C. (3,063,038.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud Daterhme: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Him
Task
Code NPT Total Depth Phase
Description of Operations
_ (hr)
_ lush)
3/24/2019 04:30 - 17:30 13.00
MOB
P PRE
MOVE RIG FROM 09-28B TO L2 -07B
-PJSM FOR MOVING RIG WITH PEAKAND
�NABORS CREWS.
- MOVE RIG OFF WELL 09 -288.
-INSTALL JEEPS
- MOVE RIG TO L2-0713
-TAKE OFF JEEPS
-SPOT STOP BLOCK
- VERIFY TREE VALVES CLOSED
-SPOT SUB OVER WELLAND SET DOWN
- SPOT PIT MODULEAND SET DOWN
- RIG ACCEPTED AT 1730
17:30 - 20:30 3.00
RIGU
P PRE
RIG UP
- COMPLETE RIG UP CHECKLISTS
- HOOK UP STEAM AND PIPING, ELECTRICAL
LINES INTERCONNECT
- VERIFY STEAM HEAT THROUGHOUT THE
RIG
- SPOTAUXILIARY EQUIPMENT
- RIG UP MP LINE
- LEAK TIGHT TEST SWAB AND MASTER
VALVES, GOOD.
NOTE: INSTALLED LOCKS AND TAGS ON
WINGSAND SWABS ON NGI WELLS 1 AND
12 -ALREADY SHUT IN AND LOCKED OUT BY
PAD OPERATOR ON 3-19-2019 _
20:30 - 00:00 3.50
RIGU
P PRE
REMOVE TREE CAP, INSTALL BOPS.
RIG UP
-INSTALL TURNBUCKLES ON BOPS.
-MU TEST JOINTASSEMBLY
3/25/2019 00:00 - 06:00 6.00
BOPSUR
P PRE
PREP BOPE TEST
-GREASE TREE, T1, T2 AND CHECK TORQUE
ON TREE FLANGE -GOOD
-FILL COIL WITH FRESHWATER
-PREP RIG FLOOR FOR BOP TEST
-CALIBRATE MICROMOTIONS
-PURGE AIR FROM SYSTEM.
Printed 5!//2019 10*14:58AM **All depths are reported in Drillers Depths"
Common Well Name: L2-07
Event Type: RE-ENTER- ONSHORE(RON)
Rig Name/No.: CDR -2
North America - ALASKA - BP Page 2 of 15
Operation Summary Report
Start Date: 3/24/2019
Site: L2
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hts Task
(hr)
06:00 - 14:00 8.00 BOPSUR
End Date: 4/2/2019
Code NPT Total Depth
(usft)
P
14:00 - 17:00 3.00 BOPSUR N
17:00 - 1745 0.75 BOPSUR P
APE No
K3 -0198F -C: (3,063,038.00 )
BPUOI:
Phase Description of Operations
PRE TEST BOPS AS PER AOGCC AND BP
REGULATIONS.
7-1/16" 5K STACK ANNULAR, BLIND/SHEAR
RAM, 2-3/8" PIPE/SLIP, 2-3/8" x 3-1/2"
VARIABLE RAM, 2-3/8" PIPE/SLIP RAM
AOGCC WITNESSED WAIVED BY BOB NOBLE
ALL TESTS TO 250 / 3500 PSI.
TEST 1: IRV, STRIPPER, C9, C10
BACKWARDS - PASS
TEST 2: BLIND / SHEARS, RI,BLIA,BI,B4—
PASS
REMOVE INJECTOR
TEST 3: ANNULAR (2-3/8"), TIW1, B3, B2, BLi -
PASS
,TEST 4: REDO, SMALL INCREASE IN
PRESSURE HALFWAY THROUGH
TEST 4: UPPER PIS, TIW2, BL2, R2, T2, C15 -
"'T2 FAIUFAIL"' TEST 4 PASS USING T1
TEST 5: C16, T1, C11 -PASS
TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2
-PASS
TEST 7: LOWER 2-3/8" P/S, C5, C6, C8, TV1 -
PASS
'TEST 8: CHOKE A, CHOKE C - PASS
HOLD PRE -SPUD & RIG EVAC DRILL WITH
DAY CREW COMING ON TOUR
CONDUCT DRAWDOWN TEST - PASS
REMOVE BOP TEST JOINTAND INSTALL 0.9'
SAVER SUB TO SPACE 3-1/2" SECTION
ACROSS ANNULAR AND VBRS. REINSTALL
TEST JOINT.
TEST 9: ANNULAR (3-1/2"), C1, C4. -
FAIUPASS
TEST 10: VARIABLES (3-1/2"), C2, C3 - PASS
FAILURES - T2 VALVE ON MPD LINE (BP
VALVE)
PRE BOP TEST COMPLETED, HOLD A PJSM TO
REPLACE T2 VALVE
- REMOVE TEST JOINT
- SUCK OUT STACK
SIMOPS - INSTALL BHI FLOATS WHILE
CHANGING OUT T2 VALVE
- RD MPLAND REMOVE T2 VALVE
- MU NEW VALVE & TORQUE
- SWAP OUT LUBRICATORS
-TEST DRILLING LUBRICATOR AND T2 VALVE
PRE GOOD PT ON DRILLING LUBRICATOR AND T2
VALVE
- REMOVE NIGHT CAPAND INSTALL QTS
- STAB INJECTOR AND PT QTS AND BHI
FLOATS
Printed 5!//2019 10:14:58AM **All depths are reported in Drillers Depths"
NorthAmerica- ALASKA - SP
Operation Summary Report
Common Well Name: L2-07
Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 3/24/2019
Project: Lisburne Site: L2
End Date: 4/2/2019
AFE No
K3 -0198F -C: (3,063 038 00 )
Page 3 of 15
Rig Name/No.: CDR -2 Spud Date rime: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC. _
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
17:45 - 18:30 0.75 BOPSUR P
PRE OPEN TO WELLAND FLOW CHECK
-PUMP METHANOL DOWN MPD LINE AND
FLUSH TREE AND STACK TAKING RETURNS
TO TIGER TANK UNTIL WE HAVE GOOD
METHANOL.
-OPEN MASTER VALVE WITH CLOSED CHOKE
AND MONITOR FOR PRESSURE -0 PSI.
-PUMP METHANOL DOWN MPD LINEAND
CHECK FOR LOSSES TAKING RETURNS TO
TIGER TANK., NO LOSSES
-MONITOR WELL FOR TEN MINUTES -STATIC
-BREAK OFF INJECTOR..
1830 - 1930 1.00 STWHIP P
WEXIT MAKE UP MILLING BHA
-HOLD PJSM
-MAKE UP MILLING BHA
-MAKE UP INJECTORAT 1915 HOURS
-TEST QTS TO 3500 PSI -GOOD TEST.
19:30 - 00:00 4.50 STWHIP P 10,900.00
WEXIT RIH
-PUMP RATE 0.4 BPM IN, 0.8 BPM OUTAT40
PSI.
-AT 3000' STOPAND FLUSH SURFACE LINES
OF METHANOL
.-CONTINUE RUN IN HOLE ATABOVE
'PARAMETERS
-AT 4600' OBSERVE OUT RATE INCREASE
AND DENSITY ON OUT MICROMOTION GO TO
6 PPG. STOPAND FLOW CHECK -DISCUSS
WITH WELL SUPERINTENDENT AND
CONTINUE IN HOLE HOLDING ONE TO ONE
RETURNS WITH CHOKE.
-TIE IN TO FORMATION (PDC) FROM 10750'
TO 10850' SENSOR DEPTH, -13' CORRECTION
-CIRCULATE KCLAT 4.25 BPM IN AND OUT
TAKING RETURNS TO TIGER TANK
NOTE BLED OFF IA FROM 1400 TO 800 PSI,
BLED OFF OA FROM 600 TO 300 PSI
NOTE:HELD KICK WHILE TRIPPING DRILL
WITH BEARD'S CREW. WELL SIMULATED
SHUT IN IN i MINUTE 13 SECONDS. AAR
HELD WITH CREW.
3/26/2019 00:00 - 01:00 1.00 STWHIP P 10,900.00
WEXIT CONTINUE TO CIRCULATE WELL TO 8.6 PPG
QUICK DRILL N
PUMPAT4.4 BPMAT3228 PSI
01:00 - 10:00 9.00 STWHIP P 10,931.00
WEXIT MILL3.8"WINDOW
-DRV TAG 924.9. DRY PICK UP 52K, DRY
DOWN Wi 22K
- RATE: 2.8 BPM IN, 2.33 BPM OUT
-UP WT 48K, DOWN WT 20K
- MUD WEIGHT: 8.58 PPG IN, 8.52 PPG OUT
- DWOB: 0.5- 3.7 KLBS
PRESSURE: 2418 PSI
10:00 - 10:15 1
_CIRC
0.25 STWHIP P
T 10,931.00
_
WEXIT PU OFF WINDOW TO SWAP RIG OVER TO
HIGHLINE POWER
****HOLD KWD DRILL....
SIMULATED INCREASED OUT RATE, PU OFF
BOTTOM AND FLOW CHECKED WELL,
SIMULATED WELL WAS STILL FLOWING AND
WELL WAS SHUT IN FOLLOWING OUR
STANDING ORDERS. MORE INFO ON
COMPLEX DRILL IN THE SAFETY COMMENTS
Printed 5/7/2019 10:14:58AM **All depths are reported in Drillers Depths**
North America - ALASKA - Blo
Operation Summary Report
Page 4 of 15
Common Well Name. L2-07
MONITOR WELL FOR 10 MINUTES AT BHA:
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 3/24/2019
End Date: 402019
X3 -0198F -C. (3,063,038 00 )
Project: Lisburne
Site: L2
- MUD WEIGHT: 8.58 PPG IN, 6.52 PPG OUT
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor. NABORSALASKA DRILLING INC.
-HOLD PJSM
BPUOI: USA00001105
Acbve datum: KB @39.30us8 (above Mean Sea Level)
MOTOR
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hO -
INDICATES WE HAVE EXITED THE WINDOW,
(usft)
RIH WITH 4-1/4" BUILD BHA#2
10:15 - 12:30 2.25
STWHIP P
10,934.00 WEXIT
CONTINUE MILLING 3.8" WINDOW
20'.00 - 20:45 0.75 DRILL P
2045 - 23'.30 2.75 DRILL P
23:30 - 00:00 0.50 DRILL P
MONITOR WELL FOR 10 MINUTES AT BHA:
- RATE: 2.7 BPM IN, 2.7 BPM OUT
-HOLD PJSM
- UP WT 48K, DOWN AT 20K
- INJECTOR OFF: 19:20
- MUD WEIGHT: 8.58 PPG IN, 6.52 PPG OUT
3.79" GO, 3.78" NO-GO
10,944.00 PROD1
- DWOB: 0.5- 3.2 KLBS
-HOLD PJSM
-CIRC PRESSURE: 2360 PSI
MOTOR
WE ARE NOT SEING ANYTHING THAT
-TEST OTS TO 250/3500 PSI -GOOD TEST
INDICATES WE HAVE EXITED THE WINDOW,
10,944.00 PROD1
RIH WITH 4-1/4" BUILD BHA#2
BOT HAND THINKS THEY STARTED V EARLY.
PRESSURE: 1010 PSI
WE ARE GOING TO CONTINUEAT 1'/HR UNTIL
-TIE IN TO FORMATION (PDC) FROM 10800'
WE SEE OUR WOB DROP OFF
12:30 - 1700 4.50 STWHIP P
10,944.00
WEXIT
GOOD INDICATION WE HAVE EXITED THE
-CLOSE EDC
BOTTOM OF THE WINDOW AT 10933.7.
DEGREES RIGHT -NO ISSUES
10,950.00 PRODi
CONTINUE MILLING AT I'/HR FOR ('THEN
MD
• START MILLING RAT HOLE
- RATE: 2.78 BPM IN, 2.78 BPM OUT. CIRC
- 10938' PUMPA 10X10 LOW/HI-VIS PILLS
- MUD WEIGHT: 8.56 PPG IN, 8.51 PPG OUT,
- DRILLED TO 10944' START REAMING
-ROP-30-70 FT/HR WOB 2- 3KLBS
PASSES
- - --
-
i- DRY DRIFT IN BOTH DIRECTIONS CLEAN _
17:00 - 19:00 2.00 STWHIP P
10,944.00
WEXIT
POH
-MONITOR WELL FOR 10 MINUTES: STATIC
-OPEN EDC, POH
j - MUD WEIGHT: 8.6 PPG IN, 8.55 PPG OUT
-RATE: 2.5 BPM IN, 2 BPM OUT
19:00 - 20:00 1.00 STWHIP P
10,944.00
WEXIT
LD BHA
20'.00 - 20:45 0.75 DRILL P
2045 - 23'.30 2.75 DRILL P
23:30 - 00:00 0.50 DRILL P
Printed 50/2019 10:14:58AM **All depths are reported in Drillers Depths**
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
-HOLD PJSM
-CLOSE EDC, POWER DOWN
- INJECTOR OFF: 19:20
- MILL IS 3.79" GO, 3.78" NO-GO. REAMER IS
3.79" GO, 3.78" NO-GO
10,944.00 PROD1
MU BHA
-HOLD PJSM
-MAKE UP BUILD BHA WITH 2.1 DEGREE
MOTOR
-INJECTOR ON AT 2030 HRS
-TEST OTS TO 250/3500 PSI -GOOD TEST
-SURFACE TEST MWD TOOLS -GOOD
10,944.00 PROD1
RIH WITH 4-1/4" BUILD BHA#2
- RATE: 1.13 BPM IN, 1.59 BPM OUT. CIRC
PRESSURE: 1010 PSI
- MUD WEIGHT: 8.54 PPG IN, 8.51 PPG OUT
-TIE IN TO FORMATION (PDC) FROM 10800'
TO 10828' BIT DEPTH, -13' CORRECTION
WT CHECK PUMPS ON -UP WT 47K, DOWN
WT 20K
-CLOSE EDC
-RIH THRU WINDOW WITH NO PUMPS AT 25
DEGREES RIGHT -NO ISSUES
10,950.00 PRODi
DRILL 4.25" BUILD FROM 10944' MD TO 10950'
MD
- FREE SPIN: 2500 PSI, 2.78 BPM
- RATE: 2.78 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 2600-2900 PSI
- MUD WEIGHT: 8.56 PPG IN, 8.51 PPG OUT,
ECD: 10.3 PPG
-ROP-30-70 FT/HR WOB 2- 3KLBS
Printed 50/2019 10:14:58AM **All depths are reported in Drillers Depths**
North America -ALASKA - BP
Operation Summary Report
Page 5 of 15
Common Well Name'. L2-07
MD
ALE No
Event Type: RE -ENTER -ONSHORE (RON)
Start Date: 3/24/20'9
End Date: 4/2/2019
X3 -0198F -O. (3,063,038.00 )
Project: Lisburne
Site: L2
PRESSURE: 2600-2900 PSI
Rig Name/No.: CDR -2
Spud DateRme: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
_ _
ECD: 10.0 PPG
BPUOI: USA00001105
Active datum: KB Q39.30usft (above Mean Sea Level)
-ROP 30-115 FT/HR WOB 24KLBS
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operators
(hr)
05:30 - 10:00 4.50 DRILL P
(usf)
_
BUILD LANDED
3/27/2019 00:00 - 05:30 5.50
DRILL P
11,178.00 PROD7
_
DRILL 4.25" BUILD FROM 10950' MD TO 11178'
Printed 5f7/2019 10:14:58AM **AII depths are reported in Drillers Depths—
MD
- FREE SPIN: 2500 PSI, 2.78 BPM
- RATE: 2.68 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 2600-2900 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.58 PPG OUT,
ECD: 10.0 PPG
-ROP 30-115 FT/HR WOB 24KLBS
- PUMP 5X5 LOW 8 HI -VIS PILLS CLOSE TO
LANDING
05:30 - 10:00 4.50 DRILL P
11,230.00 PROD/
_
BUILD LANDED
'- CIRCULATE THE OH CLEAN THEN DYNAMIC
FLOW CHECK WELL
-GOOD DFC, POOH TO THE WINDOW
- OPEN EDC AND POOH AT MAX RATE
• HOLDING 10.0 PPG AT THE WINDOW
-AT SURFACE, JOG IN HOLE 200', PU THEN
FLOWCHECKAT50'
- REVIEW BHA HANDLING PROCEDURE
WHILE BLEEDING OFF WHP
- LOST 3 BBLS ON TOOH
-GOOD NO FLOW CHECK, PU THE INJECTOR
- INJECTOR OFFAT 09:20, CHANGE OUT BHA
-BIT GRADE =2-21 BTI BU
10:00 - 1300 3.00 DRILL P
11,230.00 PROD1
BHA MU WITH 1.1" MOTOR AND DURAFORCE
XD IMPACT BIT, INJECTOR ON AT 10:00
- PT THE OTS AND RIH
-LOG TIE IN
-CORRECT DEPTH -14(8 MIN)
- SURVEY AT 11192 FOR JORPS
13-.00 - 1800 5.00 DRILL P
11,230.00 PROD/
DRILL 4.25" LATERAL
-FREE SPIN: 3310 PSI, 2.78 BPM
- RATE: 2.78 BPM IN, 2.81 BPM OUT. CIRC
PRESSURE: 3310-3600 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.63 PPG OUT,
ECD: 10.1 PPG
- ROP 10-135 FT/HR WOB 24 KLBS
- LOOKS LIKE WE MAY HAVE CROSSED
FAULT #1 AT -11338'
1800 - 1930 1.50 DRILL P
11,700.00 PROD/
DRILL 4.25" LATERAL
- FREE SPIN: 3576 PSI, 2.74 BPM
- RATE: 2.75 BPM IN, 2.73 BPM OUT. CIRC
PRESSURE: 3576- 3670PSI
- MUD WEIGHT: 8.73 PPG IN, 8.69 PPG OUT,
ECD: 10.3 PPG
- ROP 130-155 FT/HR WOB 14 KLBS
-PUMPED MULTIPLE SWEEPS. CUTTINGS
RECOVERYINCREASED ^15%.
- PUMPED 15 BBLS OF HIVIS AT 11700' PRIOR
TO LONG WIPER.
Printed 5f7/2019 10:14:58AM **AII depths are reported in Drillers Depths—
Common Well Name: L207
Event Tyne. RE-ENTER- ONSHORE(RON)
Proiect: Lisburne
North America - ALASKA - BP Page 6 of 15
Operation Summary Report
Start Date: 3/24/2019 Eno Date'. 4/2/2019
Site: L2
Spud Date/time: 8/28/1998 12:00 OOAM
AFE No
X3 -0198F -C: (3,063,038.00 )
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001105
Active datum: KB @39.30us8 (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
(hr). - — - (usft)
19:30 - 21:00 1.50 DRILL P 11,700.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW
21:00 - 00:00 3.00 DRILL P
3/28/2019 00:00 - 04:00 4.00
04:00 - 06:30 2.50
06:30 - 09:00 2.50
FROM 11700' MD TO 10150MD
- RATE: 2.75 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 3567 PSI
- PERFORM 100' JOG PRIOR TOP PULLING
THROUGH WINDOW. OPEN EDC
- RATE: 4.1 BPM IN, 4.0 BPM OUT, 3382 PSI
CIRC PRESSURE.
WIPER UP TO 10150'.
- HIVIS SWEEPAT SURFACE, 65% INCREASE
IN CUTTINGS. CONTINUE TO CIRCULATE
UNTIL SHAKER CLEANED UP.
- LOG DOWN FOR TIE-IN FROM 10800' TO
10812' MD (FORMATION) WITH +5'
CORRECTION
_ 1 - TIE IN RA MARKER TO PDC LOG
11,832.00 PROD1 DRILL 4.25' LATERAL
- FREE SPIN: 3324 PSI, 2.79 BPM
- RATE: 2.75 BPM IN, 2.73 BPM OUT. CIRC
PRESSURE: 3576- 3670PSI
- MUD WEIGHT: 8.74 PPG IN, 8.66 PPG OUT,
ECD: 10.1 PPG
. ROP WO FT/HR WOB 1-3 KLBS
DRILL P 11,889.00 I
PROD1 DRILL 4.25" LATERAL
- FREE SPIN. 3416 PSI, 2.77 BPM
- RATE: 2.78 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3416-3720 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.78 PPG OUT,
ECD: 10.25 PPG
- ROP 80-120 FT/HR WOB 1-3 KLBS
- PERFORM BHA WIPERS AS NEEDED
- 11980'ROP DECLINING. WEIGHTTRANSFER
ISSUE. PERFORM 300' WIPER.
DRILL P 11,889.00
PROD1 DRILL 4.25" LATERAL
- FREE SPIN: 3416 PSI, 2.75 BPM
- RATE: 2.75 BPM IN, 2.75 BPM OUT. CIRC
PRESSURE: 3416- 3747 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.67 PPG OUT,
ECD: 10.17 PPG
- ROP 80 FT/HR WOB 1-3 KLBS
- PUMP 1OX10 PILLS
DRILL P 12,150.00
PROD1 WIPER TRIP TO THE WINDOW
- CHASE 1 OX10 PILLS TO THE WINDOW
- PUMP 1OX10 PILLS FOR THE CASED HOLE
- FIRST 10X10 BROUGHT UP 30% INCREASE
IN CUTTING, NOT MUCH MORE ON THE 2ND
10X10
- CLEAN TRIP TO THE WINDOW
I- LOG TIE IN, CORRECT DEPTH +6'AND RIH
Printed 5n12019 10:14:58AM **All depths are reported in Drillers Depths"
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @39.30usft (above Mean Sea Level)
North America - ALASKA - BP Page 7 of 15
BPUOI: USA00001105
Operation Summary Report
Common Weli Name: L2-07
APE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 3/24/2019 End Date. 4/2/2019 X3 -0198F -C: (3,063,038.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00 OOAM Rio Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @39.30usft (above Mean Sea Level)
BPUOI: USA00001105
Date From - To
Hm Task
Code NPT Total Depth
Phase Description of Operations
In
(usl
09:00 - 18:00
Soo DRILL
P 12,396.00
PRODt CLEAN TRIP BACK TO BOTTOM, DRILL 4.25"
LATERAL
- FREE SPIN: 3340 PSI, 2.75 BPM
- RATE: 2.75 BPM IN, 2.76 BPM OUT. CIRC
i PRESSURE: 3675- 3950 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.70 PPG OUT,
li WINDOW ECD: 10.22 PPG
'- ROP 80 FT/HR WOB 1-3.5 KLBS
- STICKY PU AT 12207'
•
- DRILLING SHALE FROM 12250 TO 12330'
THEN INTO A SAND LENS
1-862590°AT 12350
- NEW PLAN IS TO HOLD 88° THEN BACK UP
ABOVE SHALE BACK INTO Z1A
'18:00 - 21:00
3.00 DRILL
P 12,396.00
PROD1 'DRILL 4.25" LATERAL
- FREE SPIN: 3443 PSI, 2.81 BPM
- RATE. 2.82 BPM IN, 2.75 BPM OUT. CIRC
PRESSURE: 3416-3747 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.72 PPG OUT,
ECD: 10.36 PPG
- ROP 20 FT/HR WOB 1-3 KLBS
1
- PICKUPS OFF BOTTOM GETTING ERRATIC.
PU HOLE. OVERPULLING TO 80K 12170'. RIH
ANDPICKBACKUP, MOVINGAGAIN.
CLEANED UP
-JOG BELOW WINDOW. SLOW PUMPS TO
MINIMUM RATE. PULLTHROUGH WINDOW
121:00
WITHOUT ISSUE. TRAP WELLHEAD
PRESSURE. OPEN EDC _
- 00:00
3.00 DRILL
P 12,396.00
PROD1 PERFORM LONG WIPER TRIP TO 2000'
- RATE: 4.31 BPM IN, 3.96 BPM OUT. CIRC
PRESSURE: 3700PSI
- STEADY CUTTINGS COMING ACROSS
SHAKER. FEW SMALL SHALE PEBBLES
- PUMP 15 BBLS OF HIVIS. RIH WHILE HIVIS
COMINGOUTEDC. HIVISATSURFACE
BROUGHTA20%INCREASE
CONTINUE RUNNING IN HOLE. _
3/29/2019 0000 - 0200
2.00 DRILL
P 12,396.00
PRODi RIH
- 3.87 BPM IN RATE, 4.33 BPM OUT RATE
-8.79PPG IN, 8.70PPG OUT RATE
02:00 - 03:00
1.00 DRILL
P 12,409.00
PROD1 LOG TIE FROM 10800' TO 10810' MD FOR A
+13'CORRECTION
-PULL UP TO 10800'. CLOSE EDC. SWAP TO
CCL MODE
- LOG CCL FROM 10800 TO 11020' FOR LINER
TOP PLACEMENT.
- RIH TO TD. MINIMUM RATE THROUGH
SHALE.
- SET DOWN IN SHALE AT 12087'MD. PU AND
ORIENTAS DRILLED. SET DOWN AND POP
THROUGH SHALE.
- SET DOWN IN SHALE AT 12177'MO. PU AND
INCREASE RATE TO 1 BPM. RUN THROUGH
CLEANLY.
Printed 5/7/2019 10:14:58AM "All depths are reported in Drillers Deptl
North America - ALASKA - BP
Page 6 of 15
Operation Summary Report
Common Well Name: 12-07
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/24/2019 End Date: 4/2/2019
X3 -0198F -C: (3,063,038,00)
Project: Lisburne Site: L2
Rig Name/No.: CDR -2 Spud Date/Time: 8118/1998 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
_ _
03:00 - 06:00 3.00 DRILL P 12,409.00 PROD1
DRILL4.25' LATERAL FROM 12409' MD
- FREE SPIN: 3642 PSI, 2.77 BPM
�- ATTEMPT TO INITIATE DRILLING. ANNULAR
PRESSURE RAPID INCREASE (PACKOFF)
- WIDE SPORADIC. PULLED 75K TO PULL
FREE 1 ST TIME.
,-ATTEMPT TO INITIATE DRILLING. SAME. PU
I OFF BOTTOM IMMEDIATELY. PULLED BSK.
SEEING OVERPULL ON WOB.
DISCUSS WITH ODE. DECISION TO PREP
'FOR BILLET
- PERFORM 10 MIN DYNAMIC FLOW CHECK
2.81 BPM IN / 2.80 BPM OUT 1:1
-CONDITION WELLBORE FOR BILLET WHILE
MOVING FLUID AROUND FOR TRIP OUT+
06:00 - 14:30 8.50 DRILL N 12,409.00 PROD1
OPEN EDC AND POOH FOR BILLET
- MU BILLET BHA WHILE POOH
- STOP POOH AT 50' JOG IN HOLE 1001, PU TO
50' CLOSE THE EDC AND SHALLOW TEST
AGITATOR
- GOOD TEST AT 2.7 BPM, FLOW CHECK
WELL
- GOOD NO FLOW, TAG UP AND LD THE BHA
- 08:45 INJECTOR OFF
- PULL DRILLING BHAAND STAND BACK,
REMOVE BIT, BIT GRADE = 3-2 BC i BU i PN
MU BILLET BHA
•
- BILLET SCRIBBED FOR HS OF 2 SLIPS
- MU BHAAND RIH
- LOG TIE IN TO, GET UP B DOWN WT -S,
PUWT = 53K RIH WT=
- CLOSE EDC AND RIH
- 10943'3K TAG WITH THE BILLET IN THE
WINDOW BUT POPPED THROUGH
-SLOW DOWN THROUGH SHALES THAT WE
TAGGED ON WIPER TRIPS
- TAG AT 11380', PU AND TRY WORKING
DOWN
- NOT MAKING IT PAST SHALE AT 11372, PU
AND ROLL BILLET 180°
- DISCUSS OPTIONS WITH ODEAND WSUPT
NEWLON
- 11310' NEXT OPTION TO SET BILLET IN
CLEAN SAND, PUH SLOW MONITORING
ANNULAR PRESSURE TO ENSURE WE DO
NOT SWAB IN THE WELL
- DECISION MADE TO SET THE TOB AT 11310',
PUH TO 11290' THEN RIH TO 11322.18'
PLACING TOBAT 11310'
- BILLET SET AT 4300 PSI, SET 5K TO MAKE
SURE IT DOESN'T MOVE
- 6.8K WOB BILLET IS SET, PU IS CLEAN.
- HOLD A PJSM TO LD THE BILLET SETTING
BHAAND MU THE DRILLING BHA
- FLOW CHECK WELL, GOOD NO FLOW,
INJECTOR OFF AT 16:20
Printed 5/712019 10:14:58AM **All depths are reported in Drillers Depths"
North America - ALASKA - BP Page 9 of 15
Operation Summary Report
Common Well Name: 12-07
APE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/24/2019 End Date 4/2/2019
X3 -0198F -C. (3,063,038 00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud DatelTime: 8/28/1998 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30ustt (above
Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth Phase
Description of Operations
-
(hr) - (usft).
14:30 - 78:00
3.50 DRILL N 12,409.00 PROD1
BHA OOH, FUNCTION TEST ROPE
- BREAK DOWN RUNNING TOLAND LOAD
OUT
- FUNCTION TEST BOPE
- DEPLOY DRILLING BHA
- PRESSURE TEST OTS TO 250 PSI LOW FOR
5 MINUTES 13500 PSI HIGH FOR 5 MINUTES
_
-INJECTOR ON: 17:35
1800 - 2200
4.00 DRILL N 12,409.00 PRODi
RIH WITH 4-114" DRILLING BHA NS
- RATE: 0.55 BPM IN, 0.97 BPM OUT. CIRC
PRESSURE: 952 PSI
MUD WEIGHT: 9.77 PPG IN, 9.78 PPG OUT
MAINTAIN WINDOW ECD AT 10.4 PPG
- LOG DOWN FOR TIE-IN FROM 10800' TO
10838.21' MD (FORMATION) WITH -16'
CORRECTION
CIRCULATE 9.8 PPG OUT. CLOSE EDC.
22:00 - 0000
2.00 DRILL N 12,409.00 PROD1
KICKOFF BILLET
- DRY TAG BILLETAT 11312' BRING PUMPS
ONLINE. INITIATE DRILLINGAT 11310.53'
- FREE SPIN: 3523 PSI, 2.80 BPM
- RATE: 2.80 BPM IN, 2.80 BPM OUT, CIRC
PRESSURE: 3523-3625 PSI
- MUD WEIGHT: 8.90 PPG IN, 8.81 PPG OUT,
ECD: 10.53 PPG
-WOB: 0.3-0.8K.
- TIME DRILL FIRST FOOT. INCREMENTALLY
INCREASE ROP. _
3/30/2019 00:00 - 02:30
2.50 DRILL IN 11,482.00 PROD1
CONTINUE INCREASING ROP. GOOD
INDICATION WE HAD SUCCESSFUL KICKOFF
DRILL LATERAL FROM 11 314'MD TO 11482'
- FREE SPIN: 3673 PSI, 2.86 BPM
- RATE: 2.86 BPM IN, 2.87 BPM OUT.
- MUD WEIGHT: 8.92 PPG IN, 8.83 PPG OUT,
ECD: 10.67 PPG
ROP: 80-120_EVER, WO_B: 1.5-3.1 KLBS
02:30 - 05:30
3.00 '., DRILL N 11,664.00 PROD1
DRILL LATERAL FROM 71462' MD TO 11664
- FREE SPIN: 3725 PSI, 2.92 BPM
-RATE: 2.94 BPM IN, 2.92 BPM OUT.
- MUD WEIGHT: 8.91 PPG IN, 8.82 PPG OUT,
EGD: 10.63 PPG
-ROP: 80 FT/HR, WOB: 1.5-3.1 KLBS
_
-PERFORMING WIPERS AS NEEDED
D530 - OT 30
2.00 DRILL N 11,710.00 PROD1
DRILLED 400'WIPE TO THE WINDOW
- JOG IN HOLE BELOW BILLET THEN REDUCE
RATE TO 0.5 BPM T PULL THROUGH
- CLEAN PASS THROUGH BILLET, BACK TO
FULL RATE
- ECD AT THE WINDOW IS 10.67, PREP FOR
'MUD SWAP
07:30 - 10:15
2.75 DRILL N 11,710.00 PROD?
DRILL 4.25" LATERAL
'.- FREE SPIN: 3860 PSI, 2.92 BPM
RATE: 2.91 BPM IN, 2.92 BPM OUT.
- MUD WEIGHT: 8.93 PPG IN, 8.85 PPG OUT,
ECD: 10.66 PPG
- ROP: 35 - 135 FT/HR, WOB: 1.5 - 3.2 KLBS
-PERFORMING WIPERS AS NEEDED
Printed 5/7/2019 10:14:58AM **All depths are reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 12-07 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date 3/24/2019 End Date. 4/2/2019 X3 -0198E -C'. (3,063,038.00 )
Project: Lisburne Site: L2
Rig Name/No.:
Page 10 of 15
Rig Contractor. NABORS ALASKA DRILLING INC.
Active datum: KB @39.30usft (above Mean Sea Level)
BPUOI: USA00001105
Date From - To Him Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
10:15 - 14:00 3.75 DRILL
N 11,946.00
PROD1 DIFFERENTIALLY STUCK
- RELAXED THE WELL HOLDING 10.4 PPG
- PULLED TO 90K 2X BUT DID NOT PULL FREE
- MIX KCL SPACERS AND PREP TO PUMP LVT,
WSUPT NEWLON NOTIFIED
-ORIENTOR IS FREE TO MOVE AND WOO
SUB IS SHOWING WT CHANGES, DIFF STUCK
ON THE MWD BETWEEN THE DPS AND
ORIENTOR
-ONLINE WITH 10 KCL, 20 LVT AND 10 KCL
- 10 BBLS OF LVT OUT SHUT DOWN THE
PUMP AND ALLOWTO SOAK
-ECD CONTINUING TO DROP OFF WHILE
SOAKING, PULL TO 90K, NO MOVEMENT,
BRING PUMP ONLINE
- CALL ODE AND DISCUSS GETTING A CRUDE
TRUCK TESTEDAND READY IN CASE WE
NEED IT
- PUMP THE LAST 4 BOILS OUTAND TRY
WORKING PIPE
- NOTABLE TO WORK PIPE FREE, CIRC LVT
OUT, MONITOR BOTTOMS UP
SEND KCLSPACERSA_N_D LVTTO THE_ TT _
14:00 - 15'.30 1.50 DRILL
N 11,946.00
PROD1 LVT & SPACERS OUT
- STILLABLE TO ORIENT BUT NO CHANGE IN
WOB NOW
- ONLINE WITH 20 BBL PILL OF LVT WITH
SPACERS
- 10 BBLS LVT OUT, LET SOAK FOR 20 MIN
- PULLED FREEAFTER 3 MIN
_
- CIRC OUT LVTTHEN CONTINUE DRILLING
1530 - 1800 2.50 DRILL
N 12,000.00
PR0D7 DRILL 4.25" LATERAL
- FREE SPIN: 3630 PSI, 2.70 BPM
- RATE: 2.7 BPM IN, 2.71 BPM OUT.
- MUD WEIGHT: 8.93 PPG IN, 8.83 PPG OUT,
ECD: 10.77 PPG
- ROP: 65 FT/HR, WOO: 1.5 —2.9 KLBS
- PERFORMING WIPERS EVERY 100'
_
_- 12000'SWAP TO N EW MUD
18:00 - 20:30 2.50 DRILL
N 12,160.00
PRODI DRILL 4-1/4' LATERAL
- FREE SPIN: 3475 PSI, 2.87 BPM
— RATE: 2.87 BPM IN, 2.85 BPM OUT. CIRC
PRESSURE: 3475-3742 PSI
- MUD WEIGHT: 8.68 PPG IN, 8.64 PPG OUT,
ECD: 10.40 PPG AT WINDOW. WELLHEAD
PRESSURE
- ROP: 114 FT/HR, WOB: 1.8-2.8 KILOS
- MULTIPLE PICKUPS
Printed 5!7/2019 10:14:58AM **All depths are reported in Drillers Depths—
Common Well Name'. 12-07
Event Type'. RE-ENTER- ONSHORE(RON)
Project: Lisburne
Rig Name/No.: CDR -2
North America -ALASKA - BP I Page 11 of 15
Operation Summary Report
Start Date. 3/24/2019
Site: L2
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Him Task
___ (hr)
20:30 - 23:00 2.50 DRILL
23:00 - 00:00 1.00
3/31/2019 00.00 - 03:00 3.00
03:00 - 0630 3.50
DRILL
DRILL
DRILL
End Date: 4/2/2019 X3 -0198F -C:(3,063,038.00)
BPUOI: USA00001105
Code NPT Total Depth
Phase Description of Operators
(usft)
N 12,160.00
PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 12160' MD TO' MD
- RATE: 2.89 BPM IN, 2.88 BPM OUT. CIRC
PRESSURE: 3373 PSI
- PUMP 10 BBLS OF LOVIS / 10 BBLS HIVIS
- NO ISSUE PULLING BY BILLET OR WINDOW.
TRAP PRESSURE. OPEN EDC.
- INCREASE RATE. INDICATION OF
MICROMOTION GETTING PLUG UP.
-PJSM, BYPASS MICROMOTION. BACK
FLUSH MICROMOTION WITH AIR. SMALL
PIECES OFALUMINUM COMING BACK.
- LOG DOWN FOR TIE-IN FROM 10790' TO
10811.70' MD (FORMATION) WITH +4'
CORRECTION
- RUN BACK TO BOTTOM
N 12,214.00
PROD? DRILL 4-1/4' LATERAL
- FREE SPIN: 3421 PSI, 2.87 BPM
- RATE: 2.87 BPM IN, 2.86 BPM OUT. CIRC
PRESSURE: 3421 - 3673 PSI
- MUD WEIGHT: 8.70 PPG IN, 8.62 PPG OUT,
'ECD- 10.40 PPG AT WINDOW. WELLHEAD
PRESSURE
--ROP: 65 FT/HR, WOB: 2.4 - 2.8 KLBS
N 12,409.00
PROD? DRILL 4-1/4" LATERAL FROM 12214' MD
- FREE SPIN: 3541 PSI, 2.86 BPM
- RATE: 2.86 BPM IN, 2.86 BPM OUT. CIRC
PRESSURE: 3541-3911 PSI
- MUD WEIGHT: 8.72 PPG IN, 8.68 PPG OUT,
ECD: 10.46 PPG AT WINDOW
- ROP: 75-85 FT/HR, WOB: 2.0 - 3.0 KLBS
P 12,472.00
PROD? DRILL 4-1/4" LATERAL FROM 12409' MD
- FREE SPIN: 3541 PSI, 2.86 BPM
- RATE: 2.86 BPM IN, 2.86 BPM OUT. CIRC
PRESSURE: 3541 - 3943PSI
- MUD WEIGHT: 8.75 PPG IN, 8.70 PPG OUT,
ECD: 10.50 PPG AT WINDOW
-ROP: 85-112 FT/HR WOB: 2.0-3.0 KLBS
06:30 - 09:30 300 DRILL P 12,610.00 PROD1 DRILLED 450' WIPER TRIP TO WINDOW
CHASING PILLS
- CLEAN PASS THROUGH BILLET AND
WINDOW AT 0.5 BPM
- OPEN THE EDC AND POOH TO 10100' AT
MAX RATE PUMPING 10X10 PILLS
- CIRC BOTTOMS UP UNTIL CLEAN
- LOG TIE IN, +8'
- PILLS BROUGHT UP A LITTLE INCREASE IN
CUTTINGS THEN CLEANED UP
-CLOSE ECD AND RIH TO CONTINUE
DRILLING
Printed 5!7/2019 10:14:58AM **All depths are reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Common Well Name: 12-07 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date3/24/2019 Enc Date. 4/2/2019 X3 -0198F -C: (3,063,038.00 )
Project: Lisburne Site: L2
Page 12 of 15
Rig Name/No.: CDR -2
Spud DateRme: 8/28/1998 12:00 OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB Q39.30usft (above
Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usft)
09:30 - 15:15
5.75 DRILL P 12,610.00 PROD?
DRILL 4-1/4° LATERAL FROM 12409' MD
- FREE SPIN: 3590 PSI, 2.86 BPM
- RATE: 2.86 BPM IN, 2.87 BPM OUT. CIRC
PRESSURE: 3590-3943 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.68 PPG OUT,
ECD: 10.48 PPG AT WINDOW
- ROP: 80120 FT/HR, WOB: 2.0- 3.0 KLBS
- 12742' STARTING TO LOOSE RETURNS,
DRILL 5' PAST THEN PU 50', CLEAN PU
- LOSSING -24 BPH
- 393 BBLS OF 8.6 PPG MUD ON LOCATION
ECD AT THE WINDOW IS 10.55 PPG, BRING
DOWN TO 10.40 PPG
- CONTINUE DRILLING LOSSES DOWN TO 18
BPH, BRING OUTA LOAD OF NEW MUD TO
_
TOP OFF PITS AND STORAGE PIT
1515 - 18.30
3.25 DRILL P 13,013.00 PROD1
WIPER TO WINDOW SYEARLY, WE ARE
ABOUT TO LOSE A SWAB ON PUMP #2
- PU AND STARTED PULLING HEAVY WITH
ANN PSI INCREASING, RIH CLEAN, PU AGAIN
AND ANN PSI IS DROPPING OFF, POH
-
- BOTTOMS UP IS JUST A LOT OF SAND,
DISCUSSED WITH ODE TO PULL TO 4000' TO
CLEAN UP TANGENT SECTION
- PUMPED 10 x 10 AT 4000' CHASE OUT.
_
MINIMALSAND. RETURNS CLEAN.
18:30 - 19:30
1.00 DRILL P 13,013.00 PROD?
RIH BACK TO BOTTOM
{.
19:30 - 20:00
0.50 DRILL P 13,013.00 PROD1
PERFORM MPD KICK WHILE TRIPPING DRILL
WITH ASSISTANT DRILLER.
- STOPPED TRIPPING
- DRILLING CHOKE AND PRESSURE TRAPPED
IN 1 MIN 10 SEC.
- DISCUSSED NOTIFICATIONS. DISCUSSED
KICK IDENTIFICATION.
20:00 - 21:30
1.50 DRILL P 13,013.00 PROD?
RIH WITH 4-1/4° DRILLING BHA#5
- RATE: 2.77 BPM IN, 2.90 BPM OUT. CIRC
PRESSURE: 3580 PSI
- MUD WEIGHT: 8.76 PPG IN, 8.66 PPG OUT
MAINTAIN 10.4 PPG ECD
- LOG DOWN FOR TIE-IN FROM 10790' TO
10798' MD (FORMATION) WITH +17'
CORRECTION
-CLOSE EDC. RIH THROUGH WINDOWAND
BILLET WITHOUT ISSUE.
- SLOW RATE THROUGH SHALE. SAT DOWN
IN SHALE AT 12800' BRING RATE UP TO 1.3
BPM. RUN RIGHT THROUGH. _
21:30 - 00:00
2.50 DRILL P 13,122.00 PRODI
DRILL 4-1/4°LATERAL FROM 13014'MD TO
13122' MD
- FREE SPIN: 3758 PSI, 2.89 BPM
- RATE: 2.89 BPM IN, 2.86 BPM OUT. CIRC
PRESSURE: 3758-4040 PSI
- MUD WEIGHT: 8.76 PPG IN, 8.67 PPG OUT,
ECD: 10.52 PPG AT WINDOW WIDE OPEN
CHOKE
- ROP: 30-100 FT/HR, WOB: 2.0 - 3.5 KLBS
Printed 517/2019 10:14:58AM "All depths are reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Page 13 of 15
Common Well Name: L2-07
13320
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 3/24/2019
End Date: 4/2/2019
X3 -0198F -C: (3,063,038.00 j
Project: Lisburne
Site: L2
ECD: 10.52 PPG AT WINDOW WIDE OPEN
Rig Name/No.: CDR -2
Spud Date7Time: 8/28/1998 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
INCREASE IN LOSS RATE AT 13190'.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
HEAL LOSSES WITH CUTTINGS.
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_ _
(usft).
- RATE: 2.90 BPM IN, 2.71 BPM OUT. CIRC
4/1/2019 00:00 - 03:00 3.00
DRILL P
.
13,320.00 PROD1
DRILL 4-1/4' LATERAL FROM 13122'MDTO
03:00 - 05:00 2.00
05:00 - 07:00 2.00
DRILL P
DRILL N
07:00 - 11:00 4.00 DRILL P
Printed 5/7/2019 10:14:58AM ••A8 depths are reported in Drillers Depths"
13320
- FREE SPIN: 3805 PSI, 2.90 BPM
- RATE: 2.90 BPM IN, 2.51 BPM OUT. CIRC
I PRESSURE: 3758 - 4040 PSI
- MUD WEIGHT: 8.78 PPG IN, 6.73 PPG OUT,
ECD: 10.52 PPG AT WINDOW WIDE OPEN
CHOKE
-ROP: 30-100 FT/HR, WOB: 2.0-3.2 KLBS
INCREASE IN LOSS RATE AT 13190'.
CONTINUE DRILLING AHEAD TO ATTEMPT TO
HEAL LOSSES WITH CUTTINGS.
13,320.00
PROD? DRILL 4-1/4" LATERAL FROM 13320' LOSSES
HEALING TO -10 BPH
�- FREE SPIN: 3805 PSI, 2.90 BPM
- RATE: 2.90 BPM IN, 2.71 BPM OUT. CIRC
'PRESSURE: 3758-4161 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.74 PPG OUT,
ECD: 10.54 PPG AT WINDOW WIDE OPEN
CHOKE
ROP 90 FT/HR, WOB: 2.0-3.2 KLBS
MULTIPLE WIPERS WHILE CONTINUING TO
'DRILLAHEAD
LUBE CONCENTRATION AT 3.25
13,320.00
PROD1 DIFFERENTIALLY STUCK
- TRAP PRESSURE FOR 10.4 ECD.
- ATTEMPT PULL ON COIL.
- NO MOVEMENT, MIX KCL PILLS TO PUMP
LVT
- 05:55 ONLINE WITH SPACERS AND 20 BELS
OF LVT
PULLED FREEAT 7 BBLS OUT
13,439.00
PROD1 DRILLED OVER 400', PUMP LVT OUT OF THE
COILAND WIPER TRIP TO THE WINDOW
- REDUCE RATE THROUGH SHALES FROM
13000 TO 12780 AND AT THE BILLET
- PUMP LHVP'S ON TRIP OUT
- JOG AT THE WINDOW THEN PULL THROUGH
- PILLS FROM BOTTOMS UP UNLOADED A
LOT OF CUTTINGS
- OPEN EDC AND PUH TO 10100' PUMPING
LHVP'S, CIRC UNTIL WELL CLEANS UP WHILE
TYING IN
- CORRECT DEPTH +13', CONTINUE
CIRCULATING
- PILLS FROM CASED HOLE CLEANED UP THE
REST OF THE CUTTINGS SHAKER IS
BASICALLY CLEAN
- CLOSE EDC AND RIH TO CONTINUE
DRILLING
- CLEAN RUN TO TD NO SET DOWNS
Printed 5/7/2019 10:14:58AM ••A8 depths are reported in Drillers Depths"
North America - ALASKA - BP Page 14 of 15
Operation Summary Report
Common Well Name: 1.2-07 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/24/2019 End Date: 41212019 X3 -0198F -C: (3,063,038.00 )
Project: Lisburne Site: L2
Rig NameNo.: CDR -2 Spud Date/Time: 8/28/1998 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
13,700.00
BPUOI: USA00001105
Active datum: KB @39.30usR (above Mean Sea Level)
- PU AND WIPE TO THE WINDOW, SPLIT THE
Date From - To His Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(usn)___.
-REDUCE RATES THROUGH SHALES AND
11:00 - 16:00 5.00 DRILL
P 13,439.00
PROD1 DRILL 4-1/4" LATERAL FROM 13320' LOSSES
HEALING TO -10 BPH
- FREE SPIN: 3873 PSI, 2.89 BPM
- RATE: 2.89 BPM IN, 2.75 BPM OUT. CIRC
18:00 - 00:00 6.00 DRILL P
13,700.00
PRESSURE: 3873-4286PSI
- MUD WEIGHT: 8.79 PPG IN, 8.69 PPG OUT,
ECD: 10.63 PPG AT WINDOW WIDE OPEN
CHOKE
-ROP: 90 FT/HR, WOB: 2.0-3.2 KLBS
- TOOLFACE WRAPPING -2000 TO GET
DESIRED TOOLFACE
- 13,600' SWAP TO NEW MUD WITH 4% LUBES
-GEO'S WANT TO DROP DOWN, HOLD 88"
- NOT ABLE TO DROP IN ANGLE, GOT
PUSHED UP 3° IN 10' AT -13480
- SLOWLY STARTING TO DROP ANGLE
16:00 - 18:00 2.00 DRILL P
13,700.00
PROD1 LOST A SWAB AND LINER ON PUMP N2
- PU AND WIPE TO THE WINDOW, SPLIT THE
LAST 500' FOR FINAL PUSH TO TD AT 13962'
-REDUCE RATES THROUGH SHALES AND
'BILLET
- To CALLED AT 13700'CONTINUE PULLING
TO WINDOW
OPEN EDC AT WINDOW.
18:00 - 00:00 6.00 DRILL P
13,700.00
PROD1 CONDITION WELLBORE FOR LINER
- RATE: 4.46 BPM IN 14.45 BPM OUT
- LOG TIE IN FROM 10790' TO 10805' WITH +10'
CORRECTION.
- CLOSE EDC, RUN TO BOTTOM TO
CORRECTTD
- RATE: 2.83 BPM IN / 3.03 BPM OUT
MAINTAINING 10.4 PPG AT WINDOW
- RUN CLEANLY BY WINDOW AND BILLET
- PUMPED 15 BBLS HIVIS PILL
- TAG CORRECTED TO AT 13703' MD
- PERFORM WIPER TO WINDOW. OPEN EDC.
JET TRAY.
- CHASE OUT OF HOLE
-RATE: 4.39 BPM IN 13.89 BPM OUT
-TAG UP. RESET DEPTHS, START BACK TO
BOTTOM
4/2/2019 00:00 - 04:30 4.50 DRILL P
13,703.00
PROD? RIH
- RATE: 2.55 BPM IN, 2.99 BPM OUT. CIRC
PRESSURE: 679 PSI
I
- MUD WEIGHT: 8.61 PPG IN, 8.57 PPG OUT
- LOG DOWN FOR TIE-IN FROM 10790" TO
10831' MD (FORMATION) WITH -15'
CORRECTION
-CLOSEEDC, DRIFT THROUGH WINDOW
AND BILLETAT MINIMUM RATE. NO ISSUES
- CONTINUE TO BOTTOM AT MINIMUM RATE.
0.55 BPM IN 10.72 BPM
- RIH WEIGHT 12-15K @ 40 FPM. CONFIRMED
TD.
Printed 5/7/2019 10:14:58AM **All depths are reported in Drillers Depths-
North America - ALASKA - BP
Operation Summary Report
Page 15 of 15
Common Well Name: L2-07
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 3/24/2019
End Date: 4/2/2019
X3 -0198F -C'. (3,063,038.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud DateMme: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hm
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft)
04:30 - 08:30 4.00
DRILL P
13,703.00 PROD?
POOH
-PERFORM 10 MIN DYNAMIC FLOW CHECK 5
BPH LOSS RATE
- LAY BEADED LINER PILL FOLLOWED BY 9.8
PPG FLUID.
-AT THE WINDOW OPEN THE EDCAND POOH
DISPLACING WELL TO 9.8 KWF
- STOPAT 10608.19'AND PAINTATD FLAG
FOR LINER (EOP = 10524.26') YELLOW FLAG
- STOPAT 7829.19'AND PAINT A WINDOW
FLAG FOR LINER (EOP = 7745.26)
� - PERFORM AND KWT DRILL, WELL
CONFIRMED FLOWING AND SHUT IN IN 35
SECONDS, ALL REPORTED IN FROM THEIR
STATIONS IN 1:15
__
-ATSURFACE FLOW_C_HECK WELL
08:30 - 10:00 1.50
DRILL P
13,703.00 PROD1
GOOD NO FLOW, PU INJECTOR AND INSPECT
PIPE
INJECTOR OFF AT 09:00
- FOUND FLAT SPOTS >20k WEAR THAT WILL
NEED TO BE CUT OUT
LD BHA, BIT GRAGE =3-2 ILTIROI
SWAP TO CON TO RUN COMPLETION
Printed 5n/2019 10'1458AM **All depths are reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 1 of 16
Common Well Name. 1-2-07
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 4/2/2019
End Date: 4/14/2019 X3 -0198F -C (1,303,515.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud Datefrime: 8/28/1996 12:00 OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Ars
Task Code
NPT Total Depth
Phase Description of Operations
_ (hr)
_ (usft)-
4/2/2019 10:00 - 14:00 4.00
CASING P
P 13,703.00
RUNPRD PREP TO CUT PIPE -REMOVE UQC - CUT
PIPE (20') AND BOOT WIRE- MU CTC, PULL
TO 50K AND PT 7O 3500 PSI - MU 1 JOINT OF
PIPE, STAB ON AND PUMPED SLACK OUT -
PUMPED 170' OF 273' OUT, WE HAVE 193' OF
pHs TUBING TO ABSORB THE REMAINING
103' THAT DID NOT PUMP OUT- CHANGE
PACKOFFS SWAP TO CON TO RUN
COMPLETION
14:00 - 17:00 3.00
CASING P
13,703.00
_
RUNPRD, -MU BOT'S X -O& SWIVEL AND NOZZLE, LOAD
AND PUMP 7/8" DRIFT BALL
'- PT PACKOFFS, CLOSE SWAB, PT DOWN
COILAND MONITOR PRESSURE FROM MPD
LINE
. - GOOD PT, BLEED OFF PRESSURE AND
OPEN SWAB, FLOW CHECK WELL
,- GOOD NO FLOW, PU INJECTOR, BALL
_
y
RECOVERED
17:00 - 00:00 7.00 CASING P 13,703.00 RUNPRD PJSM, RUN LINER OPS
- MAKE UP LINER PER APPROVED TALLY.
- MAKE UP LINER RUNNING TOOL
- MAKE UP 6 JOINTS 2-3/8" PH -6
- FINAL TOP OFF OF PIPE. TOTAL LOSS 20.5
BBLS
4/3/2019 00:00 - 02:00 2.00 CASING P 13,703.00 RUNPRD RIH WITH 3-1/2" x 3-1/4" x 2-7/8" LINER ON
COIL
- RATE: 0.23 BPM IN, 0.63 BPM OUT. CIRC
PRESSURE: 1224 PSI
- MUD WEIGHT: 8.72 PPG IN, 9.82 PPG OUT
- TIE-IN TO (WHITE FLAG) AT 10833.85' WITH
-29.85' CORRECTION. CORRECT DEPTH TO
10804' MD
- PU WEIGHT @ 30 FPM 59K RIH WEIGHT
1T5K
-RIH TO WINDOW
0200 - 0330 1.50 CASING P 13,703.00 RUNPRD CIRCULATE WELLBORE OVER TO 8.6 PPG
-INITIAL RATE: 0.94 BPM / 0.89 BPM OUT
2050# CIRCULATING PRESSURE
-INITIAL MW 8.72 PPG IN / 9.83 PPG OUT
-FINAL RATE: 1.55 BPM IN / 1.52 BPM OUT
-FINAL MW 8.86 PPG/8.88 PPG 60K/
03:30 - 05:30 2.00 CASING P 13,703.00 RUNPRD RIH WITH LINER
- RATE: 1.0 BPM IN / 0.91 BPM OUT W/ 265 PSI
WH
- 8.86 PPG IN / 8.80 PPG OUT 2082 PSI
CIRCULATING PRESSURE
- BEGIN WORKING LINER FROM 12360' TO
12946'. TAG MULTIPLE TIMES. BRING
PUMPS ONLINE WITH WEIGHT STACKED.
- PUMPING THEN GETTING 20' ATA SHOT.
START STAGING LVTAND 1% KCL
Printed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths"'
North America - ALASKA - BP
Page 2 0/ 16
Operation Summary Report
Common Well Name: L2-07
AFE No
Event Type. COM- ONSHORE (CON) Start Date'. 4/2/2019 End Date. 4/14/2019
X3 -0196F -C: (1,303,615.00)
Project: Lisburne Site: L2
Rig Name/No.: CDR -2 Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
05:30 - 13:00 7.50 CASING P 13,703.00 RUNPRD
_
WORKING LINER TO BOTTOM
- SHUT DOWN PUMP, ALLOW OUT RATE TO
GO TO NO FLOW HOLDING 580 PSI WHP, PU
AND RIH
- TALK TO ODE ABOUT REDUCING WHP TO
260 PSI WITH NO PUMP, WE ARE ONLY
GETTING 20' AT A TIME WHILE PUMPING. PU'S
ARE CLEAN AND I THINK WE ARE FIGHTING
HYDRAULICS WITH WHP AND PUMPING.
LEAVE PUMP OFF WHILE RIH
-MADE 42', ONLINE WITH PUMP
- SHUT DOWN PUMPAND MADE 104'
- STOPPED MAKING PROGRESS AT 13351',
PUMP FOR 15 MIN THEN TRYAGAIN AND
MADE 75'
I- PU AND NOT GETTING ANY DEEPER,
DISCUSS WITH ODE TO DROP WHP TO
100PSI ON NEXT TRY
- PU AND MADE 10', BLEED WHP TO 100 PSI
ANDTRYAGAIN
- MADE 901, CIRCUILATE THEN TRY AGAIN
- WENT PAST TD FLAG AT 13581 -2' OFF
FROM PIPE STRETCH
- MADE IT DOWN TO 13683' 20' FROM TD
- DISCUSS LVT WITH ODE, KEEP WORKING IT
13:00 16:00 3.00 CASING P 13,703.00 RUNPRD
WORK LINER TO BOTTOM
- PUMP 15 BBLS SPACER, 20 BBLS LVT, 15
BBLS SPACER
- WITH 5 BBLS OIL OUT WORK PIPE 3 TIMES
WHILE PUMPING MIN RATE, TAGGING AT
SAME DEPTH 13683'.
- PUMP 2 MORE BBLS OIL OUT SHUT DOWN
PUMP TRAP 500 PSI WHP, LET SOAK 10 MIN
- WORK PIPE 3 MORE TIMES WITH NO PUMP.
TAGGING AT SAME DEPTH 13683'. HAVE 10
BBLS OIL OUT AT THIS POINT.
- PUMP 3 MORE BBLS OUT AND LET SOAK,
BLEED WHP DOWN TO 250 PSI AND WORK
PIPE 3 MORE TIMES WITH NO PUMP.
- MAKE 1 FT OF PROGRESS DOWN TO 13687'.
- PUMP REMAINING OIL OUT WHITE CT IS IN
TENSION. SOAK FOR 10 MIN AND WORK
PIPE 3 MORE TIMES, NO PROGRESS PAST
13687'.
- DISCUSS RESULTS WITH ODE.
16:00 - 18:00 2.00 CASING P 13,70300 RUNPRD
CIRCULATE LVF TO SURFACE, HOLD 220 PSI
WHP.
- DROP PRESSURE TO ZERO.
- ESTABLISH PU PARAMETERS. 68K TO 69K
WITH 13' TO BREAKOVER.
18:00 - 19:30 1.50 CASING P 13,703.00 RUNPRD
PJSM, FOR DROPPING BALL.
LOAD AND LAUNCH 5/8" STEEL BALL
- 3700 PSI @ 66.6 BBLS.
- PU AND VERIFY RELEASE. 13678' MD Q 54K
-SIMOPS: RU CEMENTERS
Printed 5/7/2019 10.15:41AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 1-2-07
Event Type: COM- ONSHORE (CON) Start Date. 4/2/2019
Project Lisburne Site: L2
Rig Name/No.: CDR -2 Spud Date/Time: 8/2
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs Task
_ (hr)
19:30 - 00:00 4.50 CASING
End Date: 4/14/2019
AFE No
X3 -0198F-0'. (1,303,615.00 )
— 1
Rig Release:
05
Page 3 of 16
Code NPT Total Depth Phase Description of Operations
_(u_sft)
P 13,703.00 RUNPRD CIRCULATE WELL OVER TO 1%KCL
- RATE: 1.51 BPM IN / 1.49 BPM OUT
CIRCULATING PRESSURE: 561#
-8.40 PPG IN /8.40 PPG OUT
SIMOPS: PRESSURE TEST CEMENTERS TO
4900#. GOOD TEST
Cement Liner:
MIX AND PUMP 36.2 BBLS OF CEMENT:
- CEMENT WET AT 21:16 HRS.
- ZERO IN MM ONCE DENSITY = 13.5 PPG
'- LOAD 36.2 BBLS 15.3 PPG CEMENT IN REEL
- SWAP TO RIG PUMP. CLEANUP LINES TO
SLB UNIT.
PERFORM DISPLACEMENT WITH RIG PUMPS
'- DISPLACE CEMENT WITH 8.4 PPG EXHAUST
PILL
- RATE: 2.0 BPM IN, 1.93 BPM OUT
-ZERO OUT MM WITH CEMENTAT SHOE AT
74.6 BBLS AWAY
- TAKE RETURNS TO TRIP TANK FOR MANUAL
STRAP
SHUT DOWN PUMPS AT 90.1 BBLS AWAY
(15.99 BBLS BEHIND PIPE) -
,LAUNCH PEE WEE DART AND LINER WIPER
PLUG AS FOLLOWS:
- PICK UP TO BREAKOVER +12 FT (13665' MD)
PER BTT REP, EXPOSE DOGS, SET DOWN AT
13777' MD (10 FT HIGHER)
-PU: 57 KLBS, SO:0 KLBS
- PUMP i BBL TO GET PEEWEE LAUNCHED.
NO LUCK. PICK UP AND ATTEMPT LAUNCH
AGAIN.
-SHIFT PEEWEE DART DOWN, PICK BACK UP
TO 13662' MD AND SIDE EXHAUST 3 BBLS OF
CEMENT AND 3 EXHAUST
- SET DOWN 10KAT 13777' MD
PRESSURE UP ON WIPER PLUG TO 2000#
AND ZERO MM.
- LINER WIPER PLUG SHEARED AT 3600 PSI
(0.4 BBLS)
DISPLACE LINER WIPER PLUG
- 17.9 BBLS DISPLACED AT 2.0 BPM: 2300 PSI
- PLUG DID NOT BUMP
- OPEN P3 BLEEDER, CHECK FLOATS. GOOD
TEST.
- START CIRCULATING AT LINER TOP.
-COUNTER IN RATE SHOWING 0.3 WITH NO
PUMPS ON. CALL ODE AND DISCUSS
DISCREPENCY BETWEEN PIT STRAP AND
THE ORION COUNTER. STING BACK IN.
PUMP 0.5 BBLS AND PRESSURE UP TO
4000#.. WIPER SEATED
-PRESSURE UPTO 1500 PSI ON OIL, PICK
UP AND CONFIRM PRESSURE DROP
- CEMENT IN PLACE: 0000 HRS
Printed Sn/2019 10:15:41AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 4 of 16
Common Well Name. 1-2-07
- 13:30
7.50
AFE No
Event Type. COM- ONSHORE (CON)
Start Date: 4/2/2019
End Date: 4/14/2019
X3 -0198F -C. (1,30361500)
Project: Lisburne -
Site: L2
0.50
14:00
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00 OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
- 0000
10.00
BPUOI: USA00001105
Active datum: KB @39.30usR (above Mean Sea Level)
. TOWN TEAM.
Date From - To Him
Task Code NPT
Total Depth Phase
Descnption of Operations
(hr)
RUNPRD OCN#4 APPROVED FOR RECOVERING PIPE.
(usfl)
REVIEW WITH CREWS, REVIEW EXCLUSION
4/4/2019 00:00 - 01:30 1.50
CASING P
13703.00 RUNPRD
CIRCULATE CEMENT
01:30 - 06:00 4.50 CASING N
06:00
- 13:30
7.50
CASING
N
13:30
- 14:00
RUNPRD STOPTRIPPING
CASING
N
0.50
14:00
MECHANICS
CASING
N
- 0000
10.00
4/5/2019 00:00 - 05:00 5.00 CASING N
Printed 5/7/2019 10:15:41AM —All depths reported in Drillers Depths"
- 11.7 PPG SLUG ON BOTTOMS UP,
- SECOND BOTTOMS UP CLEAN KCL.
- START TRIPPING OUT OF HOLE.
13,703.00
RUNPRD STOPTRIPPING
.-DRILLERHEARD OLD BANG. IMMEDIATELY
blovvhu
I - INVESTI�ED BY RIG MANAGER AND
MECHANICS
_ _- NOTIFIED SUPT_AND ODE.
13703.00
RUNPRD FORMULATE AND REVIEW PLAN FORWARD
FOR CT RECOVERY WITH RIG TEAM AND
. TOWN TEAM.
CIRCULATE WELL ACROSS THE TOP
CONTINUOUSLY, WELL STATIC.
_
13,703.00
RUNPRD OCN#4 APPROVED FOR RECOVERING PIPE.
REVIEW WITH CREWS, REVIEW EXCLUSION
ZONES ANDOCN#4.
13,703.00
RUNPRD CLOSE LOWER PIPE/SLIP RAMS, ACTIVATE
AUTOLOCKS.
INSTALL CT CLAMP BACKAT REEL.
RELAX CT WEIGHT BACK TO 5KAND
RELEASE CHAIN TRACTION PRESSURE.
NOTABLE TO SLIP CHAINS DUE TO BIND OF
LOOSE GRIPPER BLOCK.
ROLL CHAINS IN SMALL INCREMENTS WHILE
RAISING INJECTOR CART.
ROLL LOOSE GRIPPER BLOCK OUTAND
INSPECT CT.
REMOVE BRASS/ELEMENTS FROM
STRIPPER.
STRIP UP TO MAXIMUM HEIGHT. MARK PIPE
FOR CUT.
INSTALLHOTTAP. PRESSURE TEST TO 500#.
GOOD TEST
BLEED OFF MINIMALAMOUNT OF FLUID.
FLOW CHECK FOR 15 MIN.
REMOVE HOT TAP. CLEAN 1/2" HOLE.
STRIP DOWN TO JUST ABOVE CUT.
INCREASE TRACTION 1000#. GRAB PIPE
DISCUSS STORED ENERGY, AND MAKING
SMALL CUT TO CONTROL PIPE MOVEMENT
INITIATE CUTTING COI" CLEAN CUT.
STRIPPING ENOUGH E -LINE TO GET TO
SLICKLINE UNIT._
13,703.00
RUNPRD FINISH STRIPPING 300'OF CABLE OUTTO
GET BACKTO SLICKLINE UNIT.
PJSM WITH INCOMING CREW. GO OVER
PLAN FORWARD.
ADJUST UNIT LOCATION AND SHEAVES.
INSTALLAIR STRIPPER. POOH
FILL BACKSIDE. WELL FULL. SEE
COMMUNICATION ON COIL SIDE
POOH WITH 5 /16" E -LINE `
FILL CLAT HALFWAYPOINT.
OI
`ECOVERED ALL E -LINE TO THE ROOT _
RIG DOWN SLICKLINE
Printed 5/7/2019 10:15:41AM —All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 5 of 16
Common Well Name: 1-2-07
13,703.00
RUNPRD
AFE No
Event Type: COM- ONSHORE(CON)
Start Date: 4/2/2019
End Date. 4/14/2019
X3 -0198F -G(1, 303, 615.00)
Project: Lisburne
Site: L2
OFF THE RIG,
Rig Name/No.: GDR -2
Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30us8 (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
GROUND.
_ _.(usR)
05:00 - 06:15 1.25
CASING N
13,703.00 RUNPRD
PJSM, DISCUSS REAMING COIL FOR INSTALL
06:15 - 12:00 5.75 CASING N
12:00 - 16:00
16:00 - 19:00
19:00 - 00:00
4/6/2019 .00:00 - 0600
_ __L._.. _
06:00 - 1600
16:00 - 17:30
4.00 CASING N
OF CTC.
DISCUSS THOROUGH INSPECTION OF
REAMINGTOOLS. TOOLS AROUND HOLE.
INSTALL CT CONNECTOR ON COIL STUB
STICKING OUT OF THE WELL.
INSTALL XO AND TI W VALVE.
LEAK TIGHT TEST WITH CHARGE PUMP
PRESSURE, NO LEAKS.
13,703.00 RUNPRD FUNCTION TEST BOP ELEMENTS, VBR AND
ANNULAR. CAN t FUNCTION S UNTIL
CT IS D.
BOTH SETS OF 2-3/8" PIPE/SLIPS ALREADY
FUNCTIONED, CLOSED AND LOCKED.
REVIEW PROCEDURE FOR UNSTABBING CT.
REVIEW EXCLUSION ZONES.
UNSTAB CT AND SECURE AT REEL.
MOVE INJECTOR TO RIG FLOOR AND PREP
TO REMOVE FROM RIG.
REMOVE GRIPPER BLOCKS, STRIPPER.
CLEAN UP INJECTOR.
13,703.00 RUNPRD CONTINUE PREP INJECTOR FOR REMOVAL.
UNHOOK ALL HYDRAULIC AND ELECTRIC
LINES.
INSPECT FOR LOOSE ITEMS.
3.00 CASING N
13,703.00
RUNPRD
PJSM WITH PEAK CREWAND NABORS CREW
FOR LIFTING GOOSENECK AND INJECTOR
OFF THE RIG,
REVIEW LIFT PLAN AND PROCEDURE,
EXCLUSION ZONES.
LIFT GOOSENECK DOWN FROM RIG TO
GROUND.
REMOVE BROKEN INJECTOR
BRING NEW INJECTOR IN.
5.00 CASING N
13,703.00
RUNPRD
PLUMB INJECTOR BACK IN.
6.00 CASING N
13,703.00
RUNPRD
INJECTOR SWAP
- FINISH PLUMBING INJECTOR
- INSTALL STRIPPER TO INJECTOR WITH OLD
BRASS.
10.00 CASING N 13,703.00 RUNPRD INSTALL HYDRAULIC LINES AND ELECTRIC
LINES ON INJECTOR.
GO THROUGH COMMISIONNING CHECKLIST.
PULLTEST INJECTOR TO 100KLBS,
CALIBRATE WEIGHT INDICATOR AND
HYDRAULIC SENSORS.
1.50 CASING N 13,703.00 RUNPRD INSTALL GRAPPLE.
PJSM FOR STABBING PIPE.
PULL PIPE OFF REELAND INTO INJECTOR,
REMOVE GRAPPLE.
Printed 5!!/2019 10:15:41AM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 6 of 16
Operation Summary Report
Common Well Name: L2-07
- 00:00
1.50
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 4/2/2019
End Date. 4/14/2019
X3 -0198F -C: (1,303,615.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud Daternme: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USAOOOO1105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
CASING
(usft)
13,703.00
77:30 - 21:30 4.00
CASING N
73,703.00 RUNPRD
FiJSM AND REVIEW PROCEDURE FOR USING
21:30 - 22:30 1.00
HYDRAULIC DIMPLING TOOL.
INSTALL DOUBLE ENDED CONNECTOR ON
UPPER SECTION OF PIPE.
PERFORM 20 MIN FLOW CHECK. WELL
STATIC
CUT CTC, TIW OFF PIPE. REAM AND BEVEL
PIPE
CENTER LOWER DIMPLE CONNECTOR.
RIPDOWN. PULLtSTTO55K(45K
HANGING + 10K)
STRIP OFF, INSPECT. LOOKS GOOD.
STRIP DOWN AND TEST QTS FOR 5 MIN LO W
AND 3500 PSI FOR 5 MIN.
CASING N 13,703.00 RUNPRD PJSM, VERIFY VALVE CHECKLIST.
,-PULL 55K ON INJECTOR.
li-VERIFYO#ONMPD LINEAND O#ON CHOKE
LINE.
- BACK OUT MANUAL LOCKS ON TOP SET OF
PIPE RAMS
- OPEN BOTTOM SET
-CIRCULATE ACROSS TOP. IMMEDIATE
RETURNS. WELL FULL
OPEN TOP SET OF PIPE RAMS
- POOH WITH SPOOLABLE. GETMULTIPLE
WRAPS ON REEL.
- ROLL PUMP DOWN COIL. PERFORM
ROLLING TEST TO 600 PSI
-SPOOLABLE AND PACKOFF LOOKS GOOD
22:30
- 00:00
1.50
CASING
N
13,703.00
RUNPRD
POOH
- MUD WEIGHT: 8.40 PPG IN, 8.43 PPG OUT
-R_ATE: 0.72 BP_MI_N,__0.5.7B_P_M_ OUT
4/7/2019 00:00
- 03:30
3.50
CASING
P�,
13,703.00
RUNPRD
LD BHA:
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- BREAK OFF AT SWIVEL.
I- LAY DOWN (6) jOINTS OF 2-3/8" BTS -6
'- LAY DOWN LINER RUNNING TOOL.
RECOVERED 5/8" BALL
- SWAP TO 1-1/4" ELEVATOR FOR UPCOMING
_ LOGGING RUN
03'.30
- 04'.00
0.50
RIGID
P
10,827.00
OTHCMP
VERIFY FLUID LEVEL.
-CLOSE MASTER/SWAB
- PERFORM VISUAL LTT TO 3500#. NO LEAKS
- OPEN MASTER VALVE. MONITOR HOLE
THROUGH MPD LINE
- PJSM WITH HES N2 PUMPERS.
- VISUAL LTT ON COIL (SPOOLABLE) /
PACKOFF / P -SUB TO 3500# PRIOR TO
INITIATING N2 BLOW DOWN.
04'.00
- 07.30
3.50
RIGID
P
10,827.00
OTHCMP
HES RIGGED UPAND SECONDARY
RESTRAINTS INSTALLED.
PT NITROGEN LINES IS GOOD.
PURGE REEL WITH N2 OUT TO TIGER TANK.
ALLOW PRESSURE TO BLEED OUT TO TT.
Printed 5/7/2019 10:15:41AM **Ali depths reported in Drillers Depths"
Primed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths"
North America
- ALASKA -
BP
Page 7 of 16
Operation Summary Report
Common Well Name: 1-2-07
AFE No
Event Type: COM- ONSHORE(CON)
Start Date'. 4/2/2019
End Date. 4/14i2019
X3-0198F-C:(1,303,615,00)
Project: Lisburne
Site: L2
Rig Name/No.: CDR-2
Spud Daterrime: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB 039.30usft (above Mean Sea Level)
DataFrom -To
Hrs
Task
Code NET
Total Depth
Phase
Description of Operations
_(hr)
(usft)
07:30 - 14:00
6.50
RIGD
N
10,827.00
OTHCMP
PJSM FOR REMOVING INNER REEL IRON.
REMOVE INNER REEL 1502 LINE.
UNSTAB PIPE AND SECURE AT REEL
CUT OFF REMAINING PIPE TAIL.
PJSM WITH PEAKAND NABORS CREW FOR
REEL SWAP,
LOWER 2-3/8" REEL DOWN, LIFT 2" REEL
#38572 UP, INSTALL IN REEL STAND. _
1400 - 00:00
10.00
ROU
P
10,827.00
OTHCMP
INSTALL 2" COMPONENTS IN STRIPPER.
INSTALL 2" GRIPPER BLOCKS.
WORK ON GETTING WASHPIPE IN REEL.
CENTER BRACES TO CLOSE. DISCUSS WITH
TEAM.
MOVE FORWARD. ELECTRICIAN INSTALLED
PRESSURE BULKHEAD IN REEL.
CLEANED AND BEGIN DRESSING BOPE
STACK. RESIDUAL GREEN CEMENT IN
LOWER 2 CAVITIES. _
4/8/2019 00:00 - 06:00
6.00
RIGU
P
10,827.00
OTHCMP
FINISH DRESSING LOWER TWO SET OF
RAMS
REMOVE SHIPPING MATERIAL FROM COIL
DRESS AND INSTALL GRAPPLE. PULLTEST
GRAPPLE
PJSM FOR PULLING COIL ACROSS.
.
_
PULL COILACROSS.
06:00 - 09:30
3.50
BOPSUR
P
10,827.00
OTHCMP
TEST WIRE, GOOD.
INSTALL INTERNAL CT CONNECTOR. PULL
TEST TO 50K
INSTALL BOP TEST RISERS.
GREASE CREW SERVICES TREE VALVES AND
_
T1, T2. _
0930 - 11:00
1.50
BOPSUR
P
10,827.00
OTHCMP
PJSMAND REVIEW PROCEDURE FOR
TESTING BOPS.
REVIEW PRESSURE XCHECK VERIFICATION
WITH DRILLER.
FLUSH LINES, PURGE AIR FROM SYSTEM
SHELL TEST BOPS.
11:00 - 12:00
1.00
BOPSUR
P
10,827.00
OTHCMP
LEAK IS SEEN ON DOOR SEAL ON BOPS.
LEAK TIGHT TEST OF SWAB AND MASTER TO
3500# IS GOOD.
VAC FLUID OUT OF BOPS.
_
OPEN BOP DOOR AND REPLACE DOOR SEAL.
12:00 - 13:30
1.50
BOPSUR
P
10,827.00
OTHCMP
SHIFT CHANGEAND PJSM WITH ONCOMING
CREW.
COMPLETE VALVE CHECKLIST.
FLUSH LINES AND GET SHELL TEST.
Primed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Page 8 of 16
Common Well Name. 12-07
- 01:30
0.50
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 4/2/2019
End Date: 4/14/2019
X3 -0198F -C: (1.303.615 00 )
Project: Lisburne
Site: L2
LOAD REEL. ONCE RETURNS SEEN AT
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
OF ELINE OUT OF SHED.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
INSTALL P-SUBAND OTS.
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
OTHCMP BHI TESTED E -LINE >2000 MEGAOHMSAND
(usft)
CONTINUITY 51 OHMS.
13:30 - 19:30 6.00
BOPSUR P
10,827.00 OTHCMP
LINEUP VALVES FOR BOP TEST.
CONNECTOR TO 3830# GOOD TEST.
10,827.00
ALL TESTS TO 250 / 3500 PSI.
TEST IRV/RACKOFF/C9 AND C10
TEST WITNESS WAIVED BY AOGCC
5 MIN LOW TO 250 PSI AND 5 MIN HIGH TO
REPRESENTATIVE GUY COOK.
10,827.00
OTHCMP ADJUST VALVE LINEUP
START WITH TEST #2 SINCE INNER REEL
TEST INNER REEL IRON AND REEL SWIVEL
IRON NOT COMPLETED YET.
10,827.00
OTHCMP PERFORM VALVE CHECKLIST
TEST#2: BLIND/SHEARS, R1, BL1A, B1, B4,
LOAD AND LAUNCH 5/a" STEEL BALL
PASS
FLOWCHECK. WELLSTATIC
REMOVE NIGHTCAPAND INSTALLTEST
JOINT.
TEST #3: ANNULAR (2"), TIW #1, B3, B2, BI -1,
PASS
TEST #4: UPPER 2-3/8" PIPE / SLIPS, TIW #2,
BL2, R2, T2, C75, FAIL ON R2, FLUID IS SEEN
PAST THE VENT POINT.
GREASE R2 AND REDO TEST #4, PASS. FAIL/
PASS ON R2.
TEST #5: C16, T1, C11, PASS
TEST #6: LOWER 2" PIPE / SLIPS, C7, C9,
C10, TV2, PASS
TEST #7: C5, C6, C8, TVI PASS
TEST #8: CHOKE A, CHOKE C PASS
PERFORM ACCUMULATOR DRAWDOWN
INSTALL 0 9' SAVER SUB ON TEST JOINT
1930 - 22:30
22:30 - 0000
TEST #9 ANNULAR (2-3/8"), C1, C4 PASS
TEST #10 VARIABLE (2-3/8") C2, C3 PASS
3.00 DISPL P 10,827.00 OTHCMP COMPLETE INNER REEL IRON, AFTER
BRACE WAS CUT OUT FOR WASHPIPE.
LAY DOWN TEST JOINT
1.50 RIGU P
4/9/2019 00.00 - 01'.00 1.00 RIGU P
01:00
- 01:30
0.50
RIGU P
01:30
- 03:30
2.00
RIGU P
Printed 5172019 10:15:41AM **All depths reported in Drillers Depths**
MAKE UP 2" SAFETY JOINT.
PJSM, DISCUSS PUMPING SLACK OUT
OFFLINE.
RIG UP E -LINE STRIPPER TO T3 LOOP.
LOAD REEL. ONCE RETURNS SEEN AT
SHAKER.
INCREASE RATE. E -LINE MOVING. PULL309'
OF ELINE OUT OF SHED.
SIMOPS: FLOORHANDS SWAPPED RISERS/
INSTALL P-SUBAND OTS.
BLOW BACK HOSE, RIG DOWN HOSE AND
STRIPPER
10,827.00
OTHCMP BHI TESTED E -LINE >2000 MEGAOHMSAND
CONTINUITY 51 OHMS.
-BOOTE-LINE. INSTALL TEST PLATE
-FLUID PACK COIL. PRESSURE TEST COIL
CONNECTOR TO 3830# GOOD TEST.
10,827.00
OTHCMP FLUID PACK
TEST IRV/RACKOFF/C9 AND C10
BACKWARDS
5 MIN LOW TO 250 PSI AND 5 MIN HIGH TO
3500# PASS
10,827.00
OTHCMP ADJUST VALVE LINEUP
OPEN IRV. CLOSE SR8/SR9
TEST INNER REEL IRON AND REEL SWIVEL
704650#. GOOD TEST.
10,827.00
OTHCMP PERFORM VALVE CHECKLIST
PJSM FOR DROPPING 5/8" DRIFT BALL
LOAD AND LAUNCH 5/a" STEEL BALL
OPEN WELL TO STACK. PERFORM 10 MIN
FLOWCHECK. WELLSTATIC
RECOVER 5/8" STEEL BALL
Printed 5172019 10:15:41AM **All depths reported in Drillers Depths**
Common Well Name. 12-07
Event Type. COM- ONSHORE (CON)
Project: Lisbume
Rig Name/No.: CDR -2
North America - ALASKA - BP Page 9 of 16
Operation Summary Report
Start Date: 4/2/2019 End Date: 4/14/2019
Site: L2
Active datum: KB @39.30usft (above Mean Sea Level)
Dale From - To Him Task
(hr)
03:30 - 0500 1.50 PERFOB
05:00 - 06:30 1.50 PERFOB
0630 - 0800 1.50 PERFOB
08:00 - 09:00 1.00 PERFOB
09:00 - 12:00 3.00 PERFOB
12:00 - 13:30 1.50 PERFOB
Code
NPT Total Depth
Phase
(usft)
P
10,827.00
OTHCMP
N
10,827.00
OTHCMP
N
10,827.00
OTHCMP
N
10,627.00
OTHCMP
P
10,827.00
OTHCMP
P
13,685.00
OTHCMP
Printed 5(//2019 10:15:41 AM **All depths reported in Drillers Depths"
AFE No
K3 -0198F -C:(1,303,615,00)
BPUOI: USA00001105
Description of Operations
PJSM FOR BHA MAKEUP
- TIMER ON CCL / GAMMA RAY SET FOR
36HRS (03:15 BATTERY CONNECTED)
- MAKE UP BHA#7.
- TEST OTS TO 3500#
- ATTEMPT TO BREAK CIRCULATION, CAN'T.
PULL BACK TO SURFACE, 10 MIN NO -FLOW IS
GOOD.
PJSM FOR UD BHA, DISCUSS POSSIBILITY
OF TRAPPED PRESSURE IN THE BHA.
OPEN RISER, UD BHA. NO TRAPPED
PRESSURE SEEN,
PIPE SCALE IS FOUND BLOCKING THE
CHECK VALVE, DISCONNECT, SOME IN THE
CIRC SUB AS WELL.
M/U ALL 4 JTS OF 1-114" THAT ARE IN THE BHA
AND CIRC THROUGH THEM ON THE WELL,
BOT REP CLEAN OUTAND REBUILD CHECK
VALVE, DISCONNECT AND CIRC SUB.
HES REP INSPECT AND CLEAN OUT CARRIER
FOR LOGGING TOOLS.
PUSH AIR THROUGH MOTOR, GOOD. _
M/U BHA #8, SAME CONFIGURATION AS BHA
#7.
RI WITH BHA#8.
CIRCULATE 0.38 BPM / 362 PSI.
PARKAT 10300' FOR 5 MIN.
LOG DOWN FROM 10300' AT 50 FT/MIN. PUMP
1.6 BPM 12700 PSI WHILE LOGGING.
WEIGHT CHECK IS 54KAT 11100'. START
ADDING MORE BARALUBE TO SYSTEM.
PRESSURE INCREASING SLOWLYAS RIH.
WEIGHT CHECKAT 11600' IS 53K.
CONTINUE LOGGING DOWN, WEIGHT CHECK
AT 12000' IS 53K.
WEIGHT CHECKAT 123601S 53K.
WEIGHT CHECKAT 126001S 52K.
STARTING TO PUSH TO GET INTO THE WELL,
STACK ATAT 12665'.
UP WEIGHT IS 66K.
PICK UP AND LOAD 20 BBLS MUD INTO CT.
Common Welt Name'. L2-07
Event Type: COM- ONSHORE (CON)
North America - ALASKA - BP Page 10 of 16
Operation Summary Report
AFE No
Start Date: 4/2/2019 End Date: 4/14/2019 X3 -0198F -C: (1,303,615,00)
Project: Lisburne Site: L2
Rig Name/No.: CDR -2 Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usR (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
Phase Description of Operations
(hr) _ (us%)
13:30 - 16:00 2.50 PERFOB N 13,685.00
_ _
D
OTHCMP RIHAND TRYTO PASS ONCE MUISAT MILL.
RIH TO 12800', WEIGHT CHECK IS 50K.
BARALUBE CONCENTRATION IS AT 1%,
START INCREASE TO I.5W
PUMPANOTHER 10 BBLS MUD IN, FREE SPIN
AROUND 3800 PSI AT 1.6 BPM.
STARTING PUSH AT 12934', WEIGHT CHECK
IS 51K.
PUMPANOTHER 15 BBLS MUD IN, UP WT AT
12990' IS 51 K.
UP WT AT 13040' IS 49K.
CONTINUE WORKING DOWN PUMPING MUD
SWEEPS.
STACK WTAND PRESSURE UP AT 13140',
POSSIBLE MOTOR STALL. CLEAN PICKUP.
CONTINUE WORKING DOWN.
UP WEIGHT AT 13180' IS 52K. MUD COMING
OUT BIT NOW, WORK DOWN TO 13200'. UP
WEIGHT HERE IS 51K.
PICKUP AT 1323TIS 51 K. WORKDOWNTO
13287' PICKUP IS 51 K.
CONTINUE WORKING DOWN IN SMALL BITES,
CLEAN PICKUPS EACH TIME.
APPEAR TO BE NEAR HELICAL LOCKUP WITH
PERIODIC CEMENT STRINGERS.
PICKUPAT 13340' IS 52K, PULL 250' WIPER
TRIP. CLEAN PASS UP,
GETTING SMALL AMOUNT OF CEMENT BACK
WITH FIRST MUD B/U.
PUMP 16 BBLS MUD FOLLOWED BY 45 BELS
OF 3% NXS LUBE PILL.
RIH, STALL AT 13152'. UP WEIGHT IS 63K.
PULL ANOTHER 1 00'WIPER TRIP FROM
113152', STILL DRAGGING A BIT ABOUT 2-4K
OVERPULL
WITH MUD COMING OUT BIT, RIH FROM
13052. STACK WEIGHT IMMEDIATELY. UP
WEIGHT IS 54K.
1600 - 2030 4.50 PERFOB N 13 685.00
OTHCMP PULL LONG WIPER TO LINER TOP, START TO
CONDITION KCL FLUID SLIGHTLY VISCOSIFY
AND ADD NXS LUBE.
STILL GETTING THIN, STEADY AMOUNT OF
CEMENT RETURNS,
CLEANS UP AFTER 1.5X B/U.
CONDITION FLUIDS AT LINER TOP. 4TH
DRUM GOING IN.
120:30 - 22:30 2.00 PERFOB N 13,685.00
OTHCMP RIH WITH LOGGING] CLEANOUT BHA#8
- RATE: 1.58 BPM IN, 1.67 BPM OUT. CIRC
PRESSURE: 2372 PSI
- MUD WEIGHT: 8.59 PPG IN, 8.52 PPG OUT
- PU 50 KLBS, SO 24.5 KLBS
- 12350' PU 49K SO 23K CIRC PRESSURE
3100#
Printed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths"
Printed 5/7/2019 10:15:41AM "All depths reported in Drillers Depths**
North America - ALASKA - SP
Page 11 of 16
Operation Summary Report
Common Well Name'. 12-07
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 4/2/2019 End Date. 4/14/2019
X3 -0198F -C: (1,303,615.00 )
Project: Lisburne
Site: L2
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth Phase
Deacnption of Operations
. (hr)
_ __-(usft)_ _
22:30 - 00:00 1.50
PERFOB N 13,685.00 OTHCMP
PICKU P AND GET PARAMETERS AFTER
PUMPING TAG AT 13345'
PUMP LINER ANNULAR VOLUME. COME
OFFLINE.
DRY TAG AT 13345'. GAINED 7K RIH DRY.
HYDRAULICS DEFINATELY PLAYING A ROLE
- RATE: 1.61 BPM IN, 1.59 BPM OUT. CIRC
PRESSURE: 3538 PSI FREE SPIN
- MUD WEIGHT: 8.61 PPG IN, 8.52 PPG OUT
- PU 48 KLBS, $O 21 KLBS
- CIRCULATING PRESSURE 3538#-3777#
�-MILLING CEMENT
- GETTING THIN, STEADYAMOUNT OF
CEMENT RETURNS.
4/10/2019 00:00 - 01:30 1.50
PERFOS N 13,685.00 OTHCMP
- MUD WEIGHT: 8.61 PPG IN, 8.52 PPG OUT
- PU 48 KLBS, SO 21 KLBS
- CIRCULATING PRESSURE 3536#-3777#
- GETTING STEADY MILLED RETURNS _
01:30 - 02:00 0.50
PERFOB N 13,685.00 OTHCMP
WIPER TRIP TO 12300'
- RATE: 1.61 BPM IN / 1.53 BPM OUT
- MW IN: 8.61 PPG IN / MW OUT: 8.53 PPG
-PU WEIGHT 47K. CIRCULATING PRESSURE:
_.
13400#
02:00 - 02:30 0.50
_
PERFOB N 13,685.00 OTHCMP
;RIH
- RATE: 1.61 BPM IN 11.53 BPM OUT
-MWIN: 8.61 PPG IN/MWOUT: 8.53 PPG
-RIH WEIGHT: 19.8K
02:30 - 05:30 3.00
PERFOB N 13,685.00 OTHCMP
_
MILL CEMENT FROM 13500' TO 13565'
- FREE SPIN: 3597 PSI, 1.60 BPM
- RATE: 1.60 BPM IN, 1.60 BPM OUT. CIRC
•
PRESSURE: 3634-3750 PSI
- MUD WEIGHT: 8.62 PPG IN, 8.53 PPG OUT
i- ROP: 30-60 FT/HR, WOB: 2.0 KLBS
'.- 13542' STALL
MILL TO 13630'.
05:30 - 07:30 2.00
PERFOB N 13 685.00 OTHCMP
PULL 100' WIPER FROM 13630' CLEAN PASS
UP AND DOWN.
MILL FROM 13630' TO 13650'.
WIPER TRIP FROM 13650' TO 12000'.
0730 - 08.30 1.00
PERFOB N 13,685.00 OTHCMP
BACK ON BOTTOM MILLING FROM 13650' TO
13678'
- FREE SPIN: 3450 PSI, 1.49 BPM
- RATE: 1.50 BPM IN, 1.50 BPM OUT. CIRC
PRESSURE: 3490-3650 PSI
- MUD WEIGHT: 8.62 PPG IN, 8.54 PPG OUT
- ROP: 30-60 FT/HR, WOB: 2 - 3 KLBS
-MILL T013678', CALL TD HERE. HAVE
REACHED E P ENOUGH Y
PERF OBJECTIVES AND MINIMIZE RISK OF
DEBRIS IN HOLE FROM MILLING UP PLUG.
08:30 - 10:30 2.00
PERFOB P 13,678.00 OTHCMP
PUMP 10 BBLS VIS SWEEPAROUND.
WIPER TRIP TO 10300' TO START LOGGING.
10:30 - 13:30 3.00
PERFOB P 13,678.00 OTHCMP
LOG DOWN FROM 10300' AT 50 FT/MIN, PUMP
1.5 BPM
LIGHT TAG AT 13669', WAIT HERE FOR 5 MIN.
PUMP 10 BBLS HI -VIS SWEEP.
LOG UP FROM 13669' AT 50 FT/MIN, PUMP 1.5
BPM.
STOPAT 11051.7'AND FLAG PIPE (10900'
EDP)
CONTINUE LOG UPAT 50 FT/MIN TO 10300'.
Printed 5/7/2019 10:15:41AM "All depths reported in Drillers Depths**
North America - ALASKA - BID Page 12 of 16
Operation Summary Report
Common Well Name: 1-2-07
BALL.
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 4/2/2019
Enc Date: 4/14/2019
X3 -0198F -C'. (1,303 615 00 )
Project: Lisburne
Site: L2
LAUNCH BALLAND PUMP 1.6 BPM.
Rig Name/No.: CDR -2
Spud Date/Time: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
HI -LINE TO GENS, RIG GOES DARK
BPUOI: USA00001105
Active datum: KB @39.30usft (above Mean Sea Level)
MOMENTARILY.
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
CONTINUE POOH.
1330 - 1700 3.50
PERFOB P
13,678.00 OTHCMP
AT 10300' STOP AND DROP 3/8" CIRC SUB
Printed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths**
BALL.
VERIFY BALL SIZE WITH WSL, DD, DRILLER
AND TOOLPUSHER.
LAUNCH BALLAND PUMP 1.6 BPM.
WHILE PUMPING BALLAROUND SWAP FROM
HI -LINE TO GENS, RIG GOES DARK
MOMENTARILY.
COME BACK ON AND GET ALL MONITORING
SYSTEMS WORKING AGAIN.
CONTINUE POOH.
BALL ON SEATAT 35 BBLS, SHEARS AT 2700
PSI.
PUMP 2.56 BPM / 3500 PSI.
1700 - 18:30 1.50 PERFOB P
13.678.00 OTHCMP
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- CLOSE EDC, POWER DOWN
-INJECTOR OFF: 17:00
-LAY DOWN MILLING BHA -MILL IN GAUGEAT
2.29"
-TAKE HLB LOGGING TOOLTO TRUCKAND
DOWNLOAD DATA
-NOTE HLB LOGGING DATA WAS NOT
READABLE -DISCUSS WITH ETLAND DECIDE
TO RUN AGAIN, CALL OUT FOR TOOLS.
-NOTE 1/4" DIAMETER BY 7.5" ROD FOUND
WEDGED IN MILL WHEN BREAKING DOWN
BHA._ _
18:30 - 19:00 0.50 PERFOB P
13,676.00 OTHCMP
SERVICE INJECTOR AND REEL
19:00 - 20:30 1.50 PERFOB P
13 678.00 OTHCMP
TEST LINER LAP
- PJSM WITH REVIEW OF PRESSURE CROSS
CHECK LIST
-PRESSURE UP 1700 PSI AT 2.4 BBLS
PUMPED. AT 1700PSI PUMPING AT 0.25 BPM
FULL INJECTION OCCURING WITH NO
PRESSURE INCREASE, STOP PUMPING AND
PRESSURE DECREASED TO 1200 PSI
BEFORE STARTING TO SLOW. CHECKED ALL
SURFACE LINES AND CONFIRM NO LEAKS AT
SURFACE. BLEED REMAINING PRESSURE
AND CALL ETLAND DISCUSS RESULTS.
APPROVAL TO CONTINUE OPERATIONS. RIG
DOWN TEST EQUIPMENT_.
2030 - 21:30 1.00 PERFOB N
13,678.00 OTHCMP
PJSM FOR BHA MAKEUP
- MAKE UP MOTOR AND MILL UP TO GAMMA
CCLTOOL
NOTE: WHILE PROGRAMMING GAMMA CCL
TOOL FOUND ISSUES WITH COMMUNICATION
WITH THE TOOL. DECISION MADE TO GET
ANOTHER TOOL FROM OFF LEASE.
NOTE: WHILE MAKING UP BHA DRIFT AND
RATTLE 1.25" CSH _
21:30 - 00:00 2.50 PERFOB N
13,678.00 OTHCMP
WAIT ON GAMMA CCL TOOL TO ARRIVE FROM
OFF SITE.
4/11/2019 00:00 - 01:00 1.00 PERFOB N
13,678.00 OTHCMP
WAIT ON GAMMA CCL TOOL TO ARRIVE FROM
OFF SITE.
Printed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 13 of 16
Operation Summary Report
Common Well Name: 1-2-07
BPUOI: USA00001105
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 4/2/2019 Eno Date: 4/14/2019
X3 -0198F -C: (1,303,615 00 )
Project: Lisburne
Site: L2
(usft)
Rig Name/No.: CDR -2
Spud DateRme: 8/28/1998 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @39.30usft (above Mean Sea Level)
BPUOI: USA00001105
Date From- To
Him
Task Code NPT Total Depth
Phase Description of Operations
_
(hr)
(usft)
01:00 - 02:30
1.50
_
PERFOB N 13,678.00
OTHCMP MAKE UPBHAFORCCL/GAMMALOG
-PJSM FOR BHA MAKEUP
-MAKE UP MAKE UP BHA FOR CCL / GAMMA
LOG
- TIMER ON CCL / GAMMA RAY SET FOR
48HRS (01:10 BATTERY CONNECTED)
TEST OTS TO 3500#
102:30 - 03:30
1.00
PERFOB N 13,678.00
OTHCMP UNABLE TO BREAK CIRCULATION DUE TO
PRESSURE BUILD UP
PULL BACK TO SURFACE, 10 MIN NO -FLOW IS
GOOD.
PJSM FOR LID BHA, DISCUSS POSSIBILITY
OF TRAPPED PRESSURE IN THE BHA.
OPEN RISER, LID BHA. NO TRAPPED
PRESSURE OBSERVED.
. PIPE DRIFT IS FOUND BLOCKING THE CHECK
VALVE.
MAKE BHA BACK UP AND TEST OTS TO 3500
PSL
03:30 - 05:30
2.00
PERFOB N 13,678.00
OTHCMP RIH
-BREAK CIRCULATION
-PUMP AT 0.28 BPM IN AND RATE OUT IS 0.62
AT 90 FPM, PUMP PRESSURE AT 656 PSI._
05:30 - 09:30
4.00
PERFOB N 13,678.00
OTHCMP PARK AT 10300' FOR 5 MIN.
LOG DOWN AT 50 FT/li PUMP 1 BPM WHILE
INSIDE LINER.
LIGHTTAGAT 13609', PICK UPAND CIRC 20
BBLS
DRY TAG AT 13606', WAIT HERE 5 MIN.
LOG UP AND STOP AT FLAG FROM PREVIOUS
RUN AND RE -PAINT IT. FLAG IS FOUND AT
10988' BAKER DEPTH (10836' EDP) ON THIS
RUN, WAS PAINTED AT 11052'(10900- EDP) ON
THE LAST RUN.
CONTINUE LOGGING UP TO 10300', WAIT
_
HERE FOR 5 MIN.
0930 - 11:00
1.50
PERFOB ? N 13,678.00
OTHCMP POOH WITH LOGGING/CLEANOUT BHA.
PUMP 1 BPM WHILE POOH.
11:00 - 12:00
1.00
PERFOB N 13,678.00
OTHCMP L/D BHA
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- OPEN RISER AND PICK UP CT, CAN'T TAG
STRIPPER
- INJECTOR OFF: 11:0_0 _
1200 - 1430
2.50
PERFOB P 13,683.00
OTHCMP REVIEW GR /CCL DATAAND PBTD
CALCULATIONS. -REVISE PBTD FROM 13678'
TO 13683' AFTER REVIEWING DATA
PREP RIG FLOOR FOR RUNNING PERF GUNS.
M / U SINGLE JOINT ELEVATORS.
REVIEW GUN LAYOUT.
CONDUCT PJSM FOR PICKING UP PERF
GUNS WITH HES AND NABORS CREW.
14:30 - 18.00
3.50
PERFOB P 13,683.00
OTHCMP M/U PERF GUNS AS PER PERF MEMO.
NOTE AT THE END OF RUNNING GUNS
INSTALL CROSSOVER AND MAKE UP TO COIL
WITHOUT FIRING HEAD. RUN IN HOLE 200'
WITH GUNS AND MAINTAIN HOLE FILLAND
WAIT TO SEE WHAT WEATHER IS
DOING -CURRENTLY PHASE 2 AND
CONDITIONS WORSENING.
Printed 5/7/2019 10:15:41 AM •'AII depths reported in Drillers Depths"
North America - ALASKA - BP
Page 14 of 16
Operation Summary Report
Common Well Name: 12-07 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 4/2/2019 End Date: 4/14/2019 X3 -0198E -C. (1,303,615 00 )
Site: L2
Rig Name/No.: CDR -2
Active datum: KB @39.30usR (above Mean Sea Level)
Date From - To Hm Task Code NP
(hr) ___ _
18:00 - 21:00 3.00 PERFOB P
21'.00 - 0000 3.00 PERFOB P
4/12/2019 00:00
- 00:30
0.50
PERFOB
P
00:30
- 04:15
3.75
PERFOB
P
04:15
- 05:30
1.25
PERFOB
P
BPUOI. USA00001105
T Total Depth
Phase Description of Operations
(ustl)
13,683.00
OTHCMP OBSERVE WEATHER
-MAINTAIN HOLE FILL -WELL IS STATIC
-HOLD SPILL DRILL WITH CREW, SIMULATING
SPILL IN MOTOR ROOM -WELL SECURED AND
ALL HANDS AT STATION BILL IN 2 MINUTES.
HOLD AAR AND REVIEW STATION BILL WITH
CREW.
-HOLD TABLE TOP 1-12S DRILL WITH
ABANDOMENT. SIMULATED 60 PPM 1-12S AT
SHAKERS. CREW SECURED WELLAND
'ABANDONDED RIG. DURING AAR WIND
DIRECTION WAS DISCUSSED AND PICKING
THE PROPER MUSTER POINT STAYING UP
WIND OF THE RELEASE. ALSO DISCUSSED
ESCAPE ROUTES AVOIDING AREAS THAT
COULD POSSIBLY HOLD H2S.
-
NOTE: WEATHER HAS NOT BEEN CALLED
PHASE 3 AS OF 2000 HRS, ACCESS ROAD TO
THE PAD HAS BEEN CLEARED AND PLAN
MADE WITH ROADS AND PADS TO MAINTAIN
A CLEAR ROAD WAY. CALL OUT
HALLIBURTON AT 2000 HRS TO RESTART
_
WELL OPERATIONS.
13,683.00
OTHCMP M/U PERF BHAAS PER PROGRAM
-FLOW CHECK WELL FOR 10
MINUTES -STATIC
-HOLD PJSM WITH CREW REMOVE
INJECTOR AND LAY DOWN 1 JT OF 21/16"
CSHANDXO
-SIMOP PROGRAM FIRING HEAD FOR 6
HOURS 15 MINUTES AND 1000 PSI
HYDROSTATIC AT 2125 HRS
-MAKE UP FIRING HEAD AND REMAINING
BHA.
-MAKE UP INJECTOR
13,683.00
OTHCMP FINISH MAKING UP INJECTOR
-TEST QTS TO 3500 PSI GOOD
13,683.00
OTHCMP BIH.
-PUMP 0..23 BPM IN / 0.55 BPM OUT AT 500
PSI WHILE RIB
-AT 10500' PU Wi=45 K RIH Wl=21K
-CORRECT AT FLAG TO 13529.75 +42.99
CORRECTION, (UNCORRECTED 13486.76) PU
W r=51 K
13,683.00
OTHCMP TAG PBTD AT 13680.33'UNCORRECTED
(CORRECTED = 13,683")
PUWf=51K RIHWr=20K
RETAG SAME DEPTH, PU Wr=50K
RE TAG, PU TO 50K STOP AND CORRECT
DEPTH TO BOTTOM SHOT
PBTD = 13,683 - 1.98' TO BTM SHOT = 13,680'
CORRECTED DEPTH TO BOTTOM SHOT
PU 70' AND START FIRING SEQUENCE
- 05: 10 FIRING SEQUENCE COMPLETED,
GUNS ON DEPTH WITH BOTTOM SHOTAT
13,680' HOLDING 150 PSI WHIP
- 05:18 GUNS FIRED (WEIGHT CHANGE AND
FLUID LOSS), POOH HOLDING 200 PSI WHP
- LOST 1.2 BELS BEFORE WHP STARTED
Printed 5/7/2019 10:15:41AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 15 of 16
Operation Summary Report
Common Well Name: 1.2-07 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 4/2/2019 End Date. 4/14/2019 X3-0198F-C (1,303,615.00 )
Project: Lisburne Site: L2
Rig Name/No.: CDR-2 Spud Date/Time: 8/28/1998 12,00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @J39.30us8 (above Mean Sea Level)
BPUOI: USA00001105
Date From - To
Him
Task Code NPT Total Depth
Phase Description of Operations
-.
(hr)
_ —. _ Wait)
05:30 - 09:30
4.00
PERFOB P 13,683.00
OTHCMP POOH AT 30 FT/MIN WHILE INSIDE LINER.
HOLD 250 PSI WHP.
AT LINER TOP BLEED OFF WHP FOR FLOW
CHECK.
TRIP SHEET IS -0.3 BBLS TO THIS POINT.
OBSERVE THIN TRICKLE OF FLUID THAT
STOPS AFTER A FEW MINUTES.
10 MIN FLOWCHECK IS GOOD, NO FLOW.
CONTINUE POOH.
AT 5400' RETURNS GETTING LIGHT.
STOP AND FLOW CHECK, NO FLOW. CHECK
WITH 4 -GAS METER, ZERO LEL, TRACES OF
CO = PERF GAS,
NOTIFY WOS AND CTD SUPT (SAME
DELEGATION)
SEND RETURNS TO TIGER TANK CONTINUE
POOH.
09:30 - 11:30
2.00
PERFOB P 13,683.00
OTHCMP PERFORM 3000' FT JOG AND SEND RETURNS
_ _ _
TO TIGER TANK.
11:30 - 00:00
12.50
PERFOB N 7 13,683.00
OTHCMP WAIT ON WEATHER. NO FLIGHTS OFF THE
SLOPE IN CASE OF INJURY.
4/13/2019 0000 - 0400
4.00
PERFOB N - 13,683.00
OTHCMP WAIT ON WEATHER. NO FLIGHTS OFF THE
SLOPE IN CASE OF INJURY.
WEATHER DROPS TO PHASE 1 CONDITIONS,
GUARDIAN FLIGHT SERVICES STILL NOT
AVAILABLE.
RECIEVE PERMISSION FROM BP WSUP AND
NABORS SUPERINTENDENT TO RESUME
OPERATIONS._
0400 - 0600
2.00
PERFOB P 13,683.00
OTHCMP -HOLD PJSM WITH CREW
-10 MINUTE FLOW CHECK -NO FLOW
-LAY DOWN PERF BHA
LAY DOWN I-1/4" CSH DOWN TO 300'.
06:00 - 11:00
5.00
PERFOB P 13,683.00
OTHCMP CONDUCTPJSM WITH HESAND NABORS
CREW.
UD REMAINING 10 CSH AND FIRING HEAD.
M/U SAFETY JTAND RUN IN WHILE
CHANGING TO SINGLE JT ELEVATORS.
UD PERF GUNS.
AFTER 12 GUNS OUT CONDUCT or DRILL
WITH WARD CREWAND HES PERF CREW.
DRILLER ACTIVATES BOP ALARM WITH PERF
GUN ON THE SKATE.
CREW SENDS PERF GUN DOWN AND LOADS
SAFETY JOINT ONTO SKATE.
MAKE UP SAFETY JOINT TO PERG GUN XO
AND RIH TO CORRECT SPACEOUT.
CREW REPORTS TO POSITIONS. WELL
SECURE IN 3 MIN 30 SEC.
CONDUCTAAR.
11:00 - 1200 1.00 PERFOB P 13,683.00 OTHCMP ALL PERF GUNS OUT, CLEAN AND CLEAR RIG
FLOOR.
OFFLOAD PERF GUNS AND HANDLING
EQUIPMENT.
PJSM FOR M/U FREEZE PROTECT NOZZLE.
Printed 517/2019 10:15:41AM **All depths reported in Drillers Depths"
Common Well Name: L2-07
Event Type: COM- ONSHORE (CON)
Protect: Lisburne
North America - ALASKA - BP Page 16 of 16
Operation Summary Report
AFE No
Start Date. 4/2/2019 End Date. 4/14/2019 X3.0198F-0.(1,303,615.00)
Site: L2
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @39.30usft (above Mean Sea Level)
Date From - To Hrs Task
(hr)
12:00 - 14:00 2.00 ROD
1400 - 15.00 1.00
15:00 - 17:00 200
-- 17:00 - 0000 7.00
RIGID
RIGID
RIGD
4/14/2019 00:00 - 04:00 4.00 RIGD
828/1998 12,00:OOAM Rig Release:
BPUOI: USA00001105
Code NPT Total Depth
Phase Description of Operations
P 13,683.00
POST M/U NOZZLE, GET ON WELL.
RIH, CONDUCT PJSM WITH LRS CREW FOR
PUMPING FREEZE PROTECT.
AT 2500' WAIT FOR DIESEL TO COME OUT
THE NOZZLE THEN POOH, LAY IN DIESEL 1:1
_ FOLLOWED BY 5 BBLS MEOH.
P 13,68300
POST AT SURFACE, 10 MIN FLOW CHECK WELL IS
'STATIC.
OPEN RISER, PULL CT UP INTO RISER.
MOVE INJECTOR OFF WELL.
GREASE CREW SERVICE TREE VALVES.
T -BAR IN_TWC.
_
P 13,683.00
POST TAKEOFF CHECK VALVES,
MAKE UP INJECTOR TO WELL.
PUMP CABLE BACK.
_ _
_ _ • RIG UP HYDRAULIC CUTTER CUT_300'_OF CT.
P 13,683.00
POST -HOLD PJSM AND REVIEW PROCEDURE FOR
EACH STEP
-UNABLE TO FIND WIRE, AFTER INSTALLING
CT CONNECTOR PUMP SLACK FORWARD TO
LOCATE WIRE.
-TEST WIRE AND MAKE UP LOC.
.-GREASE HCR AND MANUAL VALVES ON BOP
-PRESSURE TEST CT CONNECTOR AND UOC
TO 4700 PSI
-BLOW DOWN SURFACE LINES AND COIL
-VACUUM OUT STACK AND TREE TO MASTER
VALVE
-DISCONNECT MPD AND LEAK TIGHT TEST
_
SWAB VALVE WITH MEOH
P 13,683.00
POST -HOLD PJSM AND REVIEW PROCEDURE FOR
EACH STEP
-LEAK TIGHT TEST SWAB 7O 3500 PSI - GOOD
TEST
-NIPPLE DOWN BOPS
-WORK ON RIG DOWN CHECKLISTS.
-BLOW DOWN STEAM.
-NIPPLE UP TREE CAP AND FLANGE ON
TANGO VALVES.
FILL VOID BETWEEN SWAB AND TREE CAP
WITH NEAT METHANOL.
LTT TREE CAP TO 3500# WITH METHANOL
ALL TREE VALVES CLOSED
CALLACTING WELLS SUPERINTENDENT TO
DISCUSS MOVING OFF WELL WITH MORE
THAN 50 PSI ON OA-RECIEVE PERMISSION
TO MOVE
*" RIG RELEASE AT 0400 HOURS
Printed 5172019 10:15:41AM **All depths reported in Drillers Depths"
Daily Report of Well Operations
L2 -07B
ACTIVITYDATE SUMMARY
T/1/0=0/0/0 Set 4" CIW "H" TWC #294 Through Stack for CDR 2. FWP=TWC/0/0 see log
4/13/2019
for details.
T/I/O=TWC/0/0. Post CDR2. RD upper CDR2 tree #3 and target 90 #2. RU production upper
tree. Torqued to API spec. PT upper tree to low 300psi and high 5000psi for 5min. ea.
Passed. Not able to pull TWC. Changeout with day crew. Job in progress See log. Final
4/14/2019
WHP's TWC/0/0.
T/I/O=TWC/0/160 Made C/O with night crew. Made multiple runs to retrieve TWC. Was not
able to pull TWC due to debris on top of TWC. FWP's TWC/0/160 turned over job to TRP
4/15/2019
crew.
T/I/O=TWC/0/150. Post Tree Replacement. Pulled 4" "H" TWC #294 @125". PT tree cap to
4/15/2019
500 psi.(PASSED).***JOB COMPLETE***. See log for details. Final WHP's 0/0/150
***WELL S/I ON ARRIVAL***(post ctd)
STANDBY FOR RAP ACTIVATION
4/17/2019
***CONTINUE ON 04-18-2019 WSR***
T/1/0= 0/0/180 (LRS Unit 46 -Assist SL: Load & Test)
Pumped 11.7 bbls of crude down TBG to assist SL with setting LTP.
PT LTP to 2313 psi ****PASSED**** Target pressure= 2160 psi, Max applied 2400 psi.
Pumped 4.3 bbls of crude down TBG to achieve test pressure of 2393 psi. 15 min loss of 62
psi psi, 30 min loss of 18 psi, for a total loss of 80 psi in 30 mins. Bled TBG pressure to 300
psi. Bled back -1.6 bbls of crude.
4/18/2019
SL in control of well upon LRS departure. CVs OTG. Final WHPs= 300/0/190
***CONT WSR FROM 4/17/19*** (post ctd)
DRIFTED W/ 2.50" CENT, 1.75" SAMPLE BAILER TO DEVIATION @ 11,188' SLM
RAN DUMMY 4 1/2" LTP W/ STINGER ASSEMBLY TO DEPLOYMENT SLEEVE @ 10,827'
MD (unable to sting in)
RAN 4 1/2" BRUSH, 3.80" GAUGE RING, 3 1/2" BRUSH TO DEPLOYMENT SLEEVE @
10,818' SLM
RAN DUMMY 4 1/2" LTP W/ STINGER ASSEMBLY TO DEPLOYMENT SLEEVE @ 10,830'
MU (tt pins snearea and ring on no-go
ET 45KB LTP (11.5' oal, 2 7/8" rsg pluginstalled) IN DEPLOYMENT SLFFVF Q 1 n 9 0'
LRS PERFORMED PASSING MIT -T TO 2313psi
EQ AND PULLED 2 7/8" RSG PLUG FROM LTP @ 10,830' MD
SET 4 1/2" WHIDDON ON LTP @ 10,804' SLM
4/18/2019
***CONT WSR ON 4/19/19***
***CONT WSR FROM 4/18/19*** (ctd)
PULLED INT-DGLVAND SET INT-S/O IN STA#1 @ 4,089' MD
PULLED EMPTY 4 1/2" WHIDDON FROM 10,804' SLM
4/19/2019
***WELL S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS***
North America - ALASKA - BP
Lisburne
L2
L2-07
L2-07BPB1
500292291071
Design: L2-07BPB1
Final Survey Report
02 April, 2019
I ••
Company:
North America - ALASKA - BP
Project:
Lisburne
Site:
L2
Well:
12-07
Wellbore:
L2-07BPB1
Design:
L2-07BPB1
BP
Final Survey Report
Local Co-ordinate Reference:
Well 1-2-07
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project Lisburne, GPMA, LISBURNE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27 ° OGP-Usa AK [4267'15864[ Using Well Reference Point
Map Zone: NAD27 ° OGP-Usa AK / Alaska zone 4 [26734'1586• Using geode8c scale factor
Site L2, TR -11-15
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 usft Slot Radius:
Well
12-07, 1-2-07
Well Position
-NI-S 0.00 usft
N
+E/ -W 0.00 usft
E
Position Uncertainty
0.00 usft
Wellbore
L2-07BP61
Magnetics
Model Name Sample Date
Decl
BGGM2018 4/1/2019
Design
L2-07BPB1
Audit Notes:
Version:
Phase:
ACTUAL
Vertical Section:
Depth From (TVD)
+N/ -S
(usft)
(usft)
2487
0 00
5,957,405.920 usft
689,322.350 usft
0.000 in
orthing: 5,963,211.650 usft
asting: 692,843.820 usft
Wellhead Elevation: 14.43 usft
ination Dip Angle
16.99 80.9:
Tie On Depth:
,EI -W
(usft)
Goo
Latitude:
Longitude:
Grid Convergence:
Field Strength
(nT)
57,430
10904 16
Direction
(°)
80.00
Latitude:
Longitude:
Ground Level:
70° 17' 18.046 N
148' 28'2.759 W
1.44 °
70' 18' 14.250 N
148° 26' 15.842 W
13.37 usft
4/2/2019 2,23:26PM Pagc 2 COMPASS 5000.1 Build81D
1#2
Company: North America - ALASKA - BP
Project: Lisburne
Site: L2
Well: L2-07
Wellbore: L2-07BPB1
Design: L2-07BPB1
Survey Program Date 4/2/2019
From To
(usft) (usft) survey (wellbore)
180.03 4,367.03 2: MWD - Standard (L2-07)
4,424.06 10,904.16 3 : MWD + IFR [Alaska] (1-2-07)
10,924.00 12,409.00 Survey #1 (L2-07BPBl)
Survey
BP
Final Survey Report
Tool Name
MWD
MWD+IFR:AK
MWD
MD
Inc
Azi
TVD
TVDSS
(usft)
(°)
V)
(usft)
(usft)
24.87
0.00
000
24.87
-14A3
180.03
0.66
283.88
180.03
140.73
273.40
0.60
239.33
273.39
234.09
359.81
1.18
229.16
359.79
320,49
448.40
1.21
230.47
448.36
409.06
538.08
1.74
232.92
538.01
498,71
616.85
2.19
235.77
618.73
577.43
704.62
2.53
233.57
704.43
665.13
734.84
2.74
230.60
734.62
695.32
765.03
2.55
237.55
764.78
725.48
796.45
2.64
247.24
796.16
756.86
826.73
2.70
256.76
826.41
787.11
854.63
2.87
268.01
854.28
814.96
883.90
3.16
279.13
883.51
844.21
913.55
3.51
288.73
913.11
873.81
943.26
4.13
298.07
942.75
903.45
973.27
5.15
304.78
972.66
933.36
1,002.41
6.47
310.27
1,001.65
962.35
1,032.53
7.59
313.19
1,031.55
992.25
1,064.46
9.07
318.29
1,063.14
1,023.84
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Description
MWD - Standard
MWD, IFR [Alaska]
MWD - Standard
NIS EIN/
(usft) (usft)
0.00
0.21
0.09
-0.72
-1.91
-3.33
-4.90
-7.00
-7.85
-8.67
-9.32
-9.76
-9.93
-9.83
-9.41
-8.61
-7.34
-5.53
-3.07
0.25
0.00
-0.87
-1.81
-2.87
-4.28
-6.10
-8.30
-11.24
-12.34
-13.46
-14.72
-16.06
-17.40
-18.92
-20.59
-22.40
-24.46
-26.78
-29.53
-32.74
Northing
(usft)
5,963,211.650
5,963,211.842
5,963,211.698
5,963,210.858
5,963,209.630
5,963,208.161
5,963,206.537
5,963,204.369
5,963,203 486
5,963,202.639
5,963,201.952
5,963,201.485
5,963,201.276
5,963,201.339
5,963,201.718
5,963,202.466
5,963,203.690
5,963,205.437
5,963,207.824
5,963,211.062
Basting
(usft)
692,843.820
692,842.947
692,842.008
692,840.967
692,839.587
692,837.807
692,835.850
692,832.760
692,831.687
692,830.584
692,829.345
692,828.019
692,826.686
692,825.155
692,823.479
692,821.654
692,819.562
692,817.189
692,814.382
692,811.086
DLsg
(Wousft)
0.00
0.43
0.51
0.69
0.05
0.60
0.58
0.40
0.83
1.23
1.42
1.48
2.05
2.23
2.22
2.95
3.84
4.91
3.90
5.18
V. Sac
(usft)
0.00
-0.82
-1.77
-2.95
-4.55
-659
-9.02
-12.29
-1351
-14.7(
-16.12
-17.51
-18.86
-20.34
-21.91
-23.55
-25.36
-27.34
-29.61
-32.20
41212019 2.23:26PM Page 3 COMPASS 5000.1 Build BID
BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing
used by
CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing
used by
CDR -2)
Well:
1-2-07
North Reference:
True
Wellbore:
L2-07BPB1
Survey Calculation Method:
Minimum Curvature
Design:
L2-07BPB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (*1100usft)
(usft)
1,096.63
9.83
320.44
1,094.87
1,055.57
4.26
-36.18
5,963,214.963
692,807.548
2.60
-34.8°
1,191.18
10.16
324.75
1,187.99
1,148.69
17.30
-46.13
5,983,227.755
692,797.264
0.86
-42.43
1,286.46
10.00
328.21
1,281.80
1,242.50
31.19
-55.34
5,963,241.408
692,787.703
0.66
-49.08
1,381.73
10.25
328.73
1,375.59
1,336.29
45.47
.64.10
5,963,255.453
692,776.582
0.28
-55.23
1,413.51
10.16
323.47
1,406.86
1,367.56
50.14
-67.23
5,963,260.040
692,775.327
2.95
-57.50
1,445.12
10.06
320.18
1,437.98
1,398.68
54.50
-70.66
5,963,264.311
692,771.789
1.85
-60.12
1,477.05
9.84
317.22
1,469.43
1,430.13
58.64
-74.30
5,963,268.361
692,768.045
1.74
-62.99
1,572.49
10.17
312.31
1,563.42
1,524.12
70.30
-86.07
5,963,279.712
692,755.980
0.96
-72.55
1,667.68
9.73
316.61
1,657.18
1,617.88
81.80
-97.81
5,963,290.909
692,743.949
0.91
-82.12
1,76343
10.13
317.50
1,751.50
1,712.20
93.89
-109.06
5,963,302.703
692,732.396
0.45
-91.10
1,794.80
11.03
319.71
1,782.33
1,743.03
98.21
-112.86
5,963,306.927
692,728.482
3.15
-94.09
1,826.18
12.17
320.96
1,813.07
1,773 77
103.07
-116.89
5,963,311.681
692,724.334
3.72
-97.21
1,857.96
13.56
320.63
1,844.05
1,804.75
108.55
-121.38
5,963,317.046
692,719.722
4.38
-100,67
1,889.80
15.56
321.47
1,874.87
1,835.57
114.78
-126.39
5,963,323141
692,714.536
8.32
-104.54
1,921.67
18.13
320.72
1,905.37
1,866.07
121.96
-132.19
5,963,330.173
692,708.550
8.09
-109.00
1,953.37
20.49
322.55
1,935.29
1,895.99
130.19
-138.69
5,963,338.227
692,701.845
7.68
-113.97
1,985.15
22.74
326.12
1,964.83
1,925.53
139.70
-145.49
5,963,347.565
692,694.796
8.20
-119.03
2,016.78
25.15
326.13
1,993.74
1,954.44
150.36
-152.65
5,963,358.035
692,687.370
7.62
-124.22
2,048.46
27.56
325.64
2,022.12
1,982.82
162.00
-160.54
5,963,369.469
692,679.185
7.64
-129.97
2,080.06
30.05
325.56
2,049.83
2,010.53
174.57
-169.15
5,963,381.813
692,670.258
7.88
-136.26
2,111.90
32.97
325.92
2,076.95
2,037.65
188.32
-178.51
5,963,395.312
692,660.550
9.20
-143.09
2,143.71
36.05
324.56
2,103.16
2,063.86
203.12
-188.79
5,963,409.841
692,649.894
9.98
-150.65
2,175.01
37.10
322.40
2,128.30
2,089.00
218.10
-199.89
5,963,424.534
692,638.413
5.31
-158.98
2,206.90
37.53
320.01
2,153.66
2,114.36
233.16
-212.00
5,963,439.281
692,625.919
4.74
-168.29
2,238.63
38.15
317.07
2,178.72
2,139.42
247.74
-224.89
5,963,453.526
692,612.663
6.01
-178.45
2,270.49
39.91
316.22
2,203.47
2,164.17
262.33
-238.66
5,963,467.752
692,598.519
5.77
-189.48
2,302.44
42.49
313.39
2,227.51
2,188.21
277.15
-253.60
5,963,482.179
692,583.208
9.96
-201.62
4212019 2:23:26PM
Page 4
COMPASS 5000.1 Build 81D
RE
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well L2-07
Project:
Lisburne
ND Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
L2-07
North Reference:
True
Wellbore:
L2-07BPB1
Survey Calculation Method:
Minimum Curvature
Design:
L2-07BPB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
An
TVD
NDSB
WS
EIW
Northing
Basting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
2,334.38
4323
313.61
2,250.92
2,211.62
292.10
-269.36
5,963,496.724
692,567.071
2.36
-214.54
2,428.76
43.03
314.03
2,319.80
2,260.50
336.78
-315.91
5,963,540.187
692,519.387
0.37
-25263
2,524.70
42.92
315.13
2,390.00
2,350.70
382.68
-362.49
5,963,584.876
692,471.645
0.79
-290.53
2,556.66
42.55
316.59
2,413.47
2,374.17
39824
-377.60
5,963,600.045
692,456.148
3.31
-302.71
2,588.30
43.45
316.31
2,436.61
2,397.31
413.88
-392.46
5,963,615.297
692,440.885
2.91
-314.63
2,620.09
45.73
313.91
2,459.25
2,419.95
429.68
-408.22
5,963,630.687
692,424.731
8.92
-327.40
2,651.92
48.09
311.94
2,481.00
2,441.70
445.50
-425.24
5,963,646.067
692,407.308
8.68
-341.42
2,746.87
48.84
311.36
2,543.95
2,504.65
492.74
-478.35
5,963,691.918
692,353.008
0.91
-385.52
2,842.03
49.32
312.51
2,606.29
2,566.99
540.79
-531.84
5,963,738.580
692,298.308
1.04
-429.85
2,936.34
49.02
311.07
2,667.95
2,628.65
588.34
-585.04
5,963,784.749
692,243.906
1.20
473.99
3,032.53
48.61
312.73
2,731.29
2,691.99
636.68
-638.92
5,963,831.687
692,188.806
1.37
-518.65
3,127.69
47.59
313.86
2,794.84
2,755.54
685.25
-690.47
5,963,878.910
692,136.027
1.39
-560.99
3,222.24
46.66
316.41
2,859.18
2,819.88
734.34
-739.35
5,963,926.731
692,085.906
2.21
-600.60
3,317.78
45.24
319.16
2,925.61
2,886.31
785.18
-785.50
5,963,976.360
692,038.475
2.55
-637.22
3,412.63
44.80
320.56
2,992.66
2,953.36
836.46
-828.75
5,964,026.515
691,993.924
1.14
-670.91
3,508.22
43.46
321.87
3,061.27
3,021.97
888.33
-870.44
5,964,077.298
691,950.912
1.70
-702.9f
3,803.65
43.43
322.70
3,130.56
3,091.26
940.25
-910.59
5,964,128.159
691,909.452
0.60
-733.48
3,699.04
40.99
320.54
3,201.21
3,161.91
990.49
-950.35
5,964,177.365
691,868.417
2.98
-763.91
3,794.56
39.76
320.56
3,273.98
3,234.68
1,038.27
-989.66
5,964,224.116
691,827.890
1.29
-794.33
3,890.11
39.68
322.74
3,347.48
3,308.18
1,086.15
-1,027.54
5,964,271.004
691,788.794
1.46
-823.33
3,985.21
41.52
322.83
3,419.68
3,380.38
1,135.37
-1,065.06
5,964,319.240
691,750.029
1.94
-851.72
4,080.23
43.67
319.23
3,489.63
3,450.33
1,185.25
-1,105.81
5,964,368.066
691,708.216
3.31
-882.99
4,175.58
44.56
316.14
3,558.10
3,518.80
1,234.31
-1,150.29
5,964,415.958
691,662.292
2.44
-918.48
4,271.22
44.42
316.24
3,626.32
3,587.02
1,282.68
-1,196.69
5,964,463.115
691,614.671
0.16
-955.77
4,366.93
44.14
316.09
3,694.85
3,655.55
1,330.88
-1,242.97
5,964,510.109
691,567.172
0.31
-992.98
4,424.06
44.00
317.62
3,735.89
3,696.59
1,359.87
-1,270.14
5,964,538.391
691,539.266
1.88
-1,014.70
4,516.64
42.84
317.87
3,803.14
3,763.84
1,406.97
-1,312.93
5,964,584.371
691,495.283
1.27
-1,048.87
41212019 2:23: 26PM Page 5 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
1-2-07
North Reference:
True
Wellbore:
L2-07BPBI
Survey Calculation Method:
Minimum Curvature
Design:
L2-07BPBI
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
An
TVD
TVDSS
NIS
ENV
Northing
Pasting
DLeg
V. Sec
(usft)
(°)
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
_
4,580.64
42.51
317.43
3,850.19
3,810.89
1,439.03
-1,342.16
5,964,615.670
691,465.247
0.69
-1,071.88
4,674.54
43.94
317.69
3,918.61
3,879.31
1,486.49
-1,385.55
5,964,661.999
691,420.855
1.53
-1,106.37
4,769.08
42.88
317.26
3,987.29
3,947.99
1,534.37
-1,429.46
5,964,708.734
691,375.533
1.16
-1,141.30
4,863.85
43.44
317.82
4,056.42
4,017.12
1,582.20
-1,473.22
5,964,755.420
691,330.562
0.72
-1,176.09
4,956.34
44.38
318.66
4,123.05
4,083.75
1,630.05
-1,515.93
5,964,802.157
691,286.638
1.19
-1,209.84
5,049.64
45.66
319.26
4,189.01
4,149.71
1,679.82
-1,559.25
5,964,850.801
691,242.052
1.44
-1,243.87
5,143.59
45.04
318.66
4,255.03
4,215.73
1,730.23
-1,603.14
5,964,900.063
691,196.891
0.80
-1,278.33
5,239.21
44.45
320.22
4,322.95
4,283.65
1,781.36
-1,646.91
5,964,950.050
691,151.823
1.30
-1,312.56
5,331.90
45.75
318.96
4,388.38
4,349.08
1,831.34
-1,68948
5,964,998.919
691,107.988
1.70
-1,345.80
5,426.99
45.32
317.96
4,454.99
4,415.69
1,882.14
-1,734.48
5,965,048.538
691,061.899
0.87
-1,381.30
5,522.09
45.07
319.37
4,522.00
4,482.70
1,932.80
-1,779.04
5,965,098.034
691,015.852
1.08
-1,416.39
5,614.08
44.49
318.30
4,587.30
4,546.00
1,981.58
-1,821.69
5,965,145.702
690,971.971
1.03
-1,449.92
5,645.61
44.60
318.31
4,609,77
4,570.47
1,998.09
-1,836.40
5,965,161.834
690,956.841
0.35
-1,461.54
5,739.45
46.86
320.58
4,675.39
4,636.09
2,048.07
-1,879.99
5,965,211.670
690,911.964
2.80
-1,495.61
5,834.39
46.08
319.09
4,740.90
4,701.60
2,101.59
-1,924.30
5,965,263.029
690,866.320
1.29
-1,530.13
5,926.70
45.90
322.20
4,805.05
4,765.75
2,152.91
-1,966.39
5,965,313.254
690,822.931
2.43
-1,562.6
6,010.99
45.66
319.81
4,863.84
4,824.54
2,199.85
-2,004.39
5,965,359.203
690,783.739
2.06
-1,591.94
6,105.90
45.48
319.01
4,930.28
4,890.98
2,251.32
-2,048.49
5,965,409.517
690,738.340
0.63
-1,626.43
6,200.83
45.04
319.04
4,997.10
4,957.80
2,302.23
-2,092.70
5,965,459.271
690,692.834
0.46
-1,661.13
6,297.57
44.29
319.53
5,065.91
5,026.61
2,353.77
-2,137.06
5,965,509.653
690,647.166
0.85
-1,695.87
6,391.80
46.26
318.19
5,132.22
5,092.92
2,404.17
-2,181.12
5,965,558.908
690,601.836
2.32
-1,730.50
6,484.31
45.53
319.08
5,196.60
5,157.30
2,454.02
-2,225.02
5,965,607.612
690,556.672
1.05
-1,765.08
6,576.73
45.25
318.89
5,261.51
5,222.21
2,503.67
-2,268.19
5,965,656.129
690,512.239
0.33
-1,798.98
6,669.96
44.92
318.42
5,327.33
5,288.03
2,553.23
-2,311.81
5,965,704.556
690,467.373
0.51
-1,833.32
6,765.09
44.67
319.06
5,394.84
5,355.54
2,603.62
-2,356.01
5,965,753.785
690,421.895
0.54
-1,868.10
6,858.42
46.15
319.06
5,460.36
5,421.06
2,653.83
-2,399.56
5,965,802.857
690,377.075
1.58
-1,902.27
6,953.97
45.99
318.45
5,526.65
5,487.35
2,705.57
-2,444.92
5,965,853416
690,330.400
0.49
-1,937.96
4/22019 2:23:26PM Page 6 COMPASS 5000.1 Build BID
by
BP
Final Survey Report
Company:
North America -ALASKA -BP
Local Coordinate Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
12-07
North Reference:
True
Wellbore:
L2-07BPB1
Survey Calculation Method:
Minimum Curvature
Design:
L2-07BPB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
An
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
7,049.93
45.99
318.83
5,593.32
5,554.02
2,757.37
-2,490.53
5,965,904.027
690,283.481
0.28
-1,973.88
7,146.12
45.81
318.35
5,660.26
5,620.96
2,809.18
.2,536.22
5,965,954.841
690,236.480
0.40
-2,00988
7,246.35
45.43
317.91
5,730.36
5,691.06
2,862.53
.2,584.03
5,966,006.739
690,187.318
0.49
-2,047.70
7,341.63
45.14
317.17
5,797.40
5,758.10
2,912.48
-2,629.73
5,966,055.497
690,140.347
0.63
-2,084.04
7,437.47
45,27
317.10
5,864.93
5,825.83
2,962.32
-2,678.00
5,966,104.138
690,092.817
0.15
-2,120.94
7,532.78
45.29
317.04
5,931.99
5,892.69
3,011.91
-2,722.13
5,966,152.520
690,045.436
0.04
-2,157.76
7,628.20
4549
316.37
5,999.00
5,959.70
3,061.35
-2,768.71
5,966,200.744
689,997.601
0.55
-2,195.05
7,724.44
44.93
315.91
6,066.81
6,027.51
3,110.59
-2,816.04
5,966,248.755
689,949.031
0.67
-2,233.11
7,820.49
44.53
317.41
6,135.05
6,095.75
3,159.75
-2,862.42
5,966,296.701
689,901.399
1.18
-2,270.25
7,917.00
44.33
317.83
6,203.97
6,164.67
3,209.66
-2,907.96
5,966,345.420
689,854.602
0.37
-2,30643
8,012.17
44.04
316.44
6,272.22
6,232.92
3,258.27
-2,953.08
5,966,392.862
689,808.253
1.07
-2,34242
8,101.34
44.22
320.11
6,336.23
6,296.93
3,304.60
-2,994.38
5,966,438.109
689,765.775
2.88
-2,375.05
8,198.14
43.57
315.82
6,406.00
6,366.70
3,354.44
-3,039.29
5,966,488.773
689,719.608
3.15
-2,410.62
8,293.89
43.08
316.12
6,475.88
6,436.36
3,401.67
-3,084.95
5,966,532.818
689,672.753
0.56
-2,447.39
8,388.56
42.76
314.92
6,544.99
6,505.69
3,447.67
-3,130.11
5,966,577.639
689,626.423
0.93
-2,483.88
8,485.09
44.72
318.05
6,614.74
6,575.44
3,496.07
.3,176.03
5,966,624.847
689,579.285
3.02
-2,520.6f
8,580.20
44.14
318.25
6,682.66
6,643.36
3,545.67
-3,220.44
5,966,673.281
689,533.612
0.63
-2,555.82
8,676.15
44.42
319.71
6,751.36
6,712.06
3,596.21
-3,264.41
5,966,722.674
689,488.370
1.10
-2,590.34
8,773.09
44.35
318.02
6,820.64
6,781.34
3,647.27
-3,309.01
5,966,772.574
689,442.473
1.22
-2,625.40
8,869.36
43.93
319.62
6,889.73
6,850.43
3,697.73
-3,353.15
5,966,821.873
689,397.050
1.24
-2,660.11
8,965.93
46.33
319.51
6,957.85
6,918.55
3,749.81
-3,397.54
5,966,872.800
689,351.342
2.48
-2,694.78
9,062.30
45.19
317.61
7,025.09
6,985.79
3,801.65
-3,443.13
5,966,923.445
689,304.439
1.73
-2,730.67
9,156.46
44.88
317.99
7,091.64
7,052.34
3,851.08
-3,487.79
5,966,971.709
689,258.528
0.36
-2,766.07
9,252.37
44.68
317.49
7,159.72
7,120.42
3,901.06
-3,533.22
5,967,020.524
689,211.836
0.42
-2,802.13
9,347.43
44.13
316.62
7,227.63
7,188.33
3,949.77
.3,578.53
5,967,068.037
689,165.291
0.86
-2,838.29
9,443.68
44.19
318.34
7,296.68
7,257.38
3,999.19
-3,623.85
5,967,116.271
669,118.725
1.24
-2,874.34
9,537.90
44.86
319.44
7,363.86
7,324.56
4,048.96
-3,667.29
5,967,164.913
689,074.025
1.09
-2,908.48
422019 2:23:26PM Page 7 COMPASS 5000.1 Build 8/D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 12-07
Project:
Lisburne
TVD Reference:
K8 @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
1.2-07
North Reference:
True
Wellbore:
L2-07BPB1
Survey Calculation Method:
Minimum Curvature
Design:
L2-07BPB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Eating
DLeg
V. Sec
(usft)
V)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
1-10 _
9,634.19
50.19
32043
7428.86
7,389.56
4,103.31
-3,712.96
5,967,218.069
689,026.970
5.58
-2,944.02
9,730.40
50.75
320.10
7490.09
7,450.79
4,160.38
-3,760.40
5,967,273.894
688,978.091
0.64
-2,980.82
9,825.97
49.51
320.51
7,551.36
7,512.06
4,216.81
-3,807.24
5,967,329.106
688,929.815
1.34
-3,017.16
9,923.16
48.49
319.73
7,615.12
7,575.82
4,273.10
-3,854.27
5,967,384.166
688,881.364
1.21
-3,053.69
10,018.00
51.51
318.72
7,676.08
7,636.78
4,328.10
-3,901.72
5,967,437.928
688,832.518
3.29
-3,090.87
10,113.60
49.60
319.12
7,736.81
7,697.51
4,383.75
-3,950.23
5,967,492.306
688,782.598
2.02
-3,128.99
10,144.93
46.86
319.11
7,757.68
7,718.38
4,401.41
-3,965.52
5,967,509.571
688,766.858
8.75
-3,140.98
10,176.28
44.17
319.29
7,779.65
7,740.35
4,418.34
-3,980.13
5,967,526.119
688,751.815
8.59
-3,152.43
10,208.76
41.46
319.59
7,803.47
7,764.17
4,435.11
-3,994.49
5,967,542.512
688,737.037
8.37
-3,163.65
10,240.86
40.37
318.83
7,827.73
7,788.43
4,451.03
-4,008.22
5,967,558.071
688,722.901
3.73
-3,174.41
10,272.95
39.89
318.74
7,852.27
7,812.97
4,466.59
-4,021.85
5,967,573.274
688,708.880
1.51
-3,185.13
10,305.42 -
37.87
318.34
7,877.54
7,838.24
4,481.86
-4,035.34
5,967,588.196
688,695.001
6.27
-3,19577
10,337.76
35.70
319.46
7,903.44
7,864.14
4,496.45
-4,048.07
5,967,602.453
688,681.899
7.02
-3,205.77
10,369.97
35.19
318.81
7,929.68
7,890.38
4,510.58
-4,060.29
5,967,616.260
688,669.321
1.97
-3,215.35
10,402.07
33.51
320.32
7,956.18
7,916.88
4,524.36
-4,072.04
5,967,629735
688,657.222
5.87
-3,224.53
10,434.30
31.48
320.80
7,983.36
7,944.06
4,537.73
-4,083.04
5,967,642.818
688,645.882
6.35
-3,233.04
10,466.13
30.69
321.13
8,010.62
7,971.32
4,550.49
4,093.39
5,967,655.312
688,635.209
2.54
-3,241.02
10,498.60
28.26
322.45
8,038.89
7,999.59
4,563.04
4,103.28
5,967,667.601
688,625.004
7.75
-3,248.58
10,530.98
27.26
321.42
8,067.54
8,028.24
4,574.92
-4,112.58
5,967,679.233
688,615.407
3.43
-3,255.67
10,563.28
26.81
322.41
8,096.31
8,057.01
4,586.47
4,121.63
5,967,690.551
688,806.057
1.97
-3,262.58
10,599.58
26.46
324.13
8,128.76
8,089.46
4,599.51
4,131.36
5,967,703.337
688,595.994
2.33
-3,269.90
10,625.55
26.48
325.58
8,152.01
8,112.71
4,608.98
-4,138.03
5,967,712.627
688,589.091
2.49
-3,274.82
10,657.83
27.34
326.16
8,180.79
8,141.49
4,621.07
-4,146.22
5,967,724.506
688,580.588
2.79
-3,280.79
10,690.11
27.86
326.67
8,209.40
8,170.10
4,633.53
-4,154.49
5,967,736.747
688,571.999
1.77
-3,286.77
10,721.98
28.07
328.61
8,237.55
8,198.25
4,646.15
-4,162.49
5,967,749.160
688,563.681
2.93
-3,292.46
10,741.66
28.22
329.90
8,254.90
8,215.60
4,654.13
-4,167.24
5,967,757.014
688,558.733
3.18
-3,295.75
10,807.44
27.74
328.98
8,312.99
8,273.69
4,680.71
-4,182.93
5,967,783.176
688,542.369
0.98
-3,306.58
422019 2.23:26PM Page 8 COMPASS 5000.1 Build 81D
Company: North America - ALASKA - BP
Project: Lisburne
8,496.84
Site L2
-4,276.98
Well: 1-2-07
688,446.163
Wellbore: L2-07BPB1
Reference:
Design: L2-07BPB1
8,554.42
Survey
4,782.86
MD Inc
5,967,882.519
Waft) 1')
21.79
10,839.79
24.90
10,871.79
22.42
10,904.16
21.61
Tien Point
5,967,902.094
10,924.00
23.50
KOP - Top of Whipstock
--
10,945.52
25.59
Interpolated Azimuth
CDR -2)
10,976.82
31.65
Interpolated Azimuth
26.63
11,005.56
36.83
Interpolated Azimuth
North Reference:
11,035.47
41.77
First clean survey
5,967,947.894
11,067.06
47.16
11,095.62
53.22
11,125.53
60.76
11,155.61
68.16
11,185.77
76.44
11,210.65
83.25
11,233.98
87.76
11,260.40
86.53
11,290.59
87.11
11,320.77
86.10
11,353.13
85.94
11,380.83
87.05
11,410.67
86.01
11,442.24
86.15
BP
Final Survey Report
320.06
8,536.14
8,496.84
4,765.81
-4,276.98
5,967,865.833
688,446.163
Local Coordinate
Reference:
Well 1-2-07
8,554.42
8,515.12
4,782.86
-4,290.77
5,967,882.519
686,431.940
21.79
-3,395.05
TVD Reference:
323.68
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
4,802.83
-4,305.92
5,967,902.094
688,416.292
25.69
-3,406.50
--
MD Reference:
8,583.66
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
4,321.30
5,967,924.020
688,400.339
26.63
-3,417.77
328.38
North Reference:
8,553.53
True
4,336.62
5,967,947.894
688,384.402
27.76
-3,428.64
332.44
8,597.21
Survey Calculation Method:
Minimum Curvature
4,348.70
5,967,968.859
688,371.785
31.73
-3,436.84
337.12
8,599.04
Database:
4,891.75
EDM R5K - Alaska PROD - ANCP1
5,967,989.628
Azi
27.81
TVD
TVDSS
8,600.36
NIS
FJW
Northing
Basting DLeg
V. Sec
1°11
-3,448.20
lush)
342.55
(usft)
8,562.73
(usft)
(usft)
(usft)
(usft) (°NOOusft)
(usft)
321.32
8,342.00
8,603.82
8,302.70
4,973.85
4,692.48
-4,191.07
5,967,794.737
688,533.930 13.67
-3,312.55
311.43
349.89
8,371.32
8,566.77
8,332.02
4,392.68
4,701.78
4,199.66
5,967,803.810
688,524.904 14.60
-3,319.59
300.96
8,607.76
8,401.34
5,032.82
8,362.04
5,968,129.674
4,708.94
-4,209.60
5,967,810.711
688,514.981 12.36
-3,327.95
297.89
8,570.27
8,419.66
4,398.86
8,380.36
688,316.716
4,712.67
-4,216.23
5,967,814.270
688,508.258 11.22
-3,333.83
302.84
5,093.86
8,439.23
5,968,190.548
8,399.93
10.75
4,717.20
-4,223.93
5,987,818.599
688,500.446 13.62
-3,34062
308.26
8,466.70
8,427.40
4,725.96
-4,236.07
5,967,827.044
688,488.085 21.05
-3,351.06
311.96
8,490.46
8,451.16
4,736.39
4.248.40
5,967,837.160
688,475.486 19.42
-3,361.40
315.13
8,513.60
8,474.30
4,74946
-4,262.11
5,967,849.867
688,461451 17.82
-3,372.62
320.06
8,536.14
8,496.84
4,765.81
-4,276.98
5,967,865.833
688,446.163
20.25
-3,384.43
321.91
8,554.42
8,515.12
4,782.86
-4,290.77
5,967,882.519
686,431.940
21.79
-3,395.05
323.68
8,570.70
8,531.40
4,802.83
-4,305.92
5,967,902.094
688,416.292
25.69
-3,406.50
--
327.08
8,583.66
8,544.36
4,825.16
4,321.30
5,967,924.020
688,400.339
26.63
-3,417.77
328.38
8,592.83
8,553.53
4,849.44
4,336.62
5,967,947.894
688,384.402
27.76
-3,428.64
332.44
8,597.21
8,557.91
4,870.72
4,348.70
5,967,968.859
688,371.785
31.73
-3,436.84
337.12
8,599.04
8,559.74
4,891.75
4,358.60
5,967,989.628
688,361.347
27.81
-3,442.94
339.86
8,600.36
8,561.06
4,916.30
4,368.27
5,968,013.916
688,351.046
11.36
-3,448.20
342.55
8,602.03
8,562.73
4,944.83
4,377.98
5,968,042.190
688,340.607
9.10
-3,452.81
346.40
8,603.82
8,564.52
4,973.85
4,386.05
5,968,070.993
688,331.802
13.17
-3,455.71
349.89
8,606.07
8,566.77
5,005.44
4,392.68
5,968,102.399
688,324.363
10.77
-3,456.76
354.43
8,607.76
8,568.46
5,032.82
4,396.45
5,968,129.674
688,319.892
16.84
-3,455.71
356.27
8,609.57
8,570.27
5,062.51
4,398.86
5,968,159.286
688,316.716
7.07
-3,452.94
352.87
8,611.73
8,572.43
5,093.86
4,401.84
5,968,190.548
688,312.933
10.75
-3,450.43
422019 223:26PM Page 9 COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 1.2-07
Project: Lisburne
TVD Reference:
KB Q 39.30usft (Kelly Bushing used by
CDR -2)
Site: 12
MD Reference:
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
Well: L2-07
North Reference:
True
Wellbore: L2-07BP81
Survey Calculation Method:
Minimum Curvature
Design: L2-07BPB1
Database:
EDM RSK- Alaska
PROD -ANCP1
Survey
MD Inc
A=I
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sac
(usft) (°)
(°)
(usft)
(usft)
(usft(
(usft(
(usft)
(usft)
(1100us1t)
(usft)
11,470.87
86.50
349.08
8,613.56
8,574.26
5,122.07
-4,406.32
5,968,218.634
688,307.729
13.27
-3,449.94
11,503.21
87.30
347.33
8,615.31
8,576.01
5,153.68
-4,412.92
5,968,250.061
688,300.319
5.94
-3,450.95
III 11,530.69
86.28
345.83
8,616.85
8,577.55
5,180.37
-4,419.29
5,968,276.574
688,293.269
6.59
-3,452.59
11,580.66
85.73
344.94
8,618.94
8,579.64
5,209.30
-4,426.83
5,968,305.299
688,284.986
3.48
-3,455.00
11,592.12
85.42
348.68
8,621.37
8,582.07
5,239.83
4,433.99
5,968,335.636
688,277.049
11.89
-3,456.74
11,620.91
86.58
354.39
8,623.38
8,584.08
5,268.22
4,438.22
5,968,363.912
688,272.097
20.19
-3,455.97
11,650.88
85.70
356.63
8,625.39
8,586.09
5,298.03
4,440.56
5,968,393.648
688,268.992
8.01
-3,453.10
11,680.78
85.64
359.65
8,627.65
8,588.35
5,327.83
4,441.52
5,968,423.407
688,267.260
10.07
-3,448.88
11,710.91
86.01
3.50
8,629.85
8,590.55
5,357.86
4,440.70
5,968,453.450
688,267.315
12.80
-3,442.85
11,740.43
86.80
7.83
8,631.70
8,592.40
5,387.17
4,437.79
5,968,482.824
688,269.469
14.88
-3,434.90
11,770.81
86.59
10.71
8,633.45
8,594.15
5,417.10
4,432.90
5,968,512.868
688,273.584
9.49
-3,424.89
11,800.89
86.59
14.83
8,635.24
8,595.94
5,446.38
4,426.27
5,968,542.304
688,279.466
13.67
-3,413.27
11,830.49
86.12
18.50
8,637.12
8,597.82
5,474.67
4,417.80
5,968,570.805
688,287.206
12.47
-3,400.02
11,861.86
86.80
16.46
8,639.06
8,599.76
5,504.54
4,408.40
5,968,600.898
688,295.840
6.84
-3,385.57
11,894.84
87.85
11.16
8,640.60
8,601.30
5,536.52
4,400.54
5,968,633.067
688,302.876
16.37
-3,372.28
11,920.52
87.51
13.73
8,641.64
8,602.34
5,561.57
4,395.01
5,968,658.253
688,307.760
10.09
-3,362.4E
11,950.32
86.47
17.02
8,643.20
8,603.90
5,590.26
4,387.12
5,968,687.134
688,314.909
11.56
-3,349.73
11,980.48
87.05
21.36
8,644.91
8,605.61
5,618.69
4,377.22
5,968,715.809
688,324.071
14.49
-3,335.05
12,012.81
86.87
25.60
8,646.61
8,607.31
5,648.11
4,364.44
5,968,745.547
688,336.091
13.19
-3,317.35
12,040.68
86.19
28.41
8,648.31
8,609.01
5,673.07
4,351.72
5,968,770.825
688,348.166
10.28
-3,300.49
12,070.41
86.56
31.37
8,650.19
8,610.89
5,698.79
4,336.94
5,968,796.915
688,362.285
10.01
-3,28146
12,101.82
87.45
37.50
8,651.84
8,612.54
5,724.65
4,319.21
5,968,823.218
688,379.343
19.69
-3,259.51
12,138.13
89.75
41.02
8,652.72
8,613.42
5,752.75
-4,296.24
5,968,851.896
688,401.580
11.58
-3,232.02
12,160.23
88.53
43.26
8,653.06
8,613.76
5,768.13
-4,281.42
5,968,868.654
688,415.979
11.54
-3,214.57
12,190.74
87.33
48.04
8,654.16
8,614.86
5,790.44
-4,259.62
5,968,890.513
688,437.219
16.14
-3,189.41
12,220.75
85.79
51.32
8,655.96
8,616.66
5,809.82
-4,236.76
5,968,910.472
688,459.548
12.06
-3,163.55
12,251.54
85.27
54.77
8,658.36
8,619.06
5,828.27
-4,212.26
5,968,929.546
688,483.591
11.30
-3,136.20
4/22019 2:23:26PM
Page 10
COMPASS
5000.1 Build BID
by
Company: North America
- ALASKA - BP
Project: Lisburne
TVD Reference:
Site: L2
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well: 1-2-07
MD Reference:
Wellbore: L2-07BPB1
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Design: L2-07BPB1
North Reference:
Survey
True
MD Inc
AM
Survey Calculation Method
(usft)
12,280.13
64.19
56.85
12,310.90
86.38
60.17
12,340.22
88.74
57.27
12,371.54
90.34
59.95
12,409.00
90.34
59.95
Projection to TD
8,660.99
8,621.69
BP
Final Survey Report
41212019 2:23:26PM Page 11 COMPASS 5000.1 Build 81D
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
TVD
TVDSS
NIS
EIW
Northing
Beating DLeg V. Sec
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°Moousit) (usft)
8,660.99
8,621.69
5,844.27
-4,188.71
5,968,946.141
688,506.718 8.17 -3,110.23
8,663,52
8,624.22
5,860.29
-4,162.57
5,968,962.820
688,532.442 12.89 -3,08170
8,664.76
8,625.46
5,875.49
-4,137.54
5,968,978.664
688,557.073 12.74 -3,054.41
8,665.02
8,625.72
5,891.80
4,110.80
5,968,995.655
688,583.375 9.97 -3,02525
8,664.79
8,625.49
5,910.56
-4,078.38
5,969,015.238
688,615.306 0.00 -2,990.06
41212019 2:23:26PM Page 11 COMPASS 5000.1 Build 81D
North America - ALASKA - BP
Lisburne
L2
L2-07
L2 -07B
IIIkPj T
Design: L2 -07B
Final Survey Report
02 April, 2019
Company:
North America - ALASKA - 8P
Project:
Lisburne
Site:
L2
Well:
12-07
Wellbore:
L2 -07B
Design:
L2 -07B
BP
Final Survey Report
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
—I
Project Lisburne, GPMA, LISBURNE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864) Using Well Reference Point
Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734'1588, Using geodetic scale factor
Site
L2, TR -11-15
Site Position:
Northing:
5,957,405 920 usft
Latitude:
From:
Map
Easting;
689,322.350 usft
Longitude:
Position Uncertainty:
0.00 usft
Slot Radius:
1900 in
Grid Convergence:
Well
1.2-07, 1-2-07
Well Position
+N/ -S 0.00 usft
Northing:
5,963,211.650 usft
Latitude:
+EI -W 0.00 usft
Easting:
692,843.820 usft
Longitude:
Position Uncertainty
0.00 usft
Wellhead Elevation:
14.43 usft
Ground Level:
Wellbore
L2-078
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
V)
(°1 (nT)
BGGM2018 3/2912019
17.00
80.95
57,431
Design
L2 -07B
Audit Notes:
Version:
1.0 Phase:
ACTUAL
Tie On Depth: 11,290.59
Vertical Section:
Depth From (TVD)
FN/ -S
-E/-W
Direction
(usft)
(usft)
(usft)
(°)
24.87
0 00
000
0.00
70° 17' 18.046 N
148' 28'2,759 W
1.44 °
70° 18' 14.250 N
148' 26'15.842 W
13.37 usft
422019 3:15: 14PM Page 2 COMPASS 5000.1 Build 81D
am
BP
Final Survey Report
Company: North America - ALASKA - BP
Well 1-2-07
Project: Lisburne
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site: L2
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well: 1.2-07
True
Wellbore: 1.2-078
Minimum Curvature
Design: 12-078
EDM R5K - Alaska PROD - ANCP1
Survey Program Date 4/2/2019
(usft)
From To
(usft)
(usft) (usft) Survey (Wellbore)
Tool Name
180.03 4,367.032: MWD - Standard (L2-07)
MWD
4,424.06 10,904.16 3: MWD+ IFR [Alaska] (1-2-07)
MWD+IFR:AK
10,924.00 11,290.59 Survey#1 (L2-07BP61)
MWD
11,310.00 13,703.00 Survey #1 (1-2-07B)
MWD
Survey
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Description
MWD - Standard
MWD+ IFR [Alaska]
MWD - Standard
MWD - Standard
MD
Inc
AN
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
(usft)
(°)
(°J
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(110ousft)
24.87
0.00
0.00
24.87
-14.43
0.00
0.00
5,963,211.650
692,843.820
0.00
180.03
0.66
283.88
180.03
140.73
0.21
-0.87
5,963,211.842
692,842.947
0.43
273.40
0.60
239.33
273.39
234.09
0.09
-1.81
5,963,211.698
692,842.008
0.51
359.81
1.18
229.16
359.79
320.49
-0.72
-2.87
5,963,210.858
692,840.967
0.69
448.40
1.21
230.47
448.36
409.06
-1.91
-4.28
5,963,209.630
692,839.587
0.05
538.08
1.74
232.92
538.01
49871
-3.33
-6.10
5963,208.161
692,837.807
0.60
616.85
2.19
235.77
616.73
57743
4.90
-8.30
5,963,206.537
692,835.650
0.58
704.62
2.53
233.57
704.43
665.13
-7.00
-11.24
5,963,204.369
692,832.760
0.40
734.84
2.74
230.60
734.62
695.32
-7.85
-12.34
5,963,203.488
692,831.687
0.63
765.03
2.55
237.55
764.78
725.48
-8.67
-13.46
5,963,202.639
692,830.584
1.23
796.45
2.64
247.24
796.16
756.86
-9.32
-14.72
5,963,201.952
692,829.345
1.42
826.73
2.70
256.76
826.41
787.11
-9.76
-16.06
5,963,201.485
692,828.019
1.48
854.63
2.87
268.01
854.28
814.98
-9.93
-17.40
5,963,201.276
692,826.686
2.05
883.90
3.16
279.13
883.51
844.21
-9.83
-18.92
5,963,201.339
692,825.155
2.23
913.55
3.51
288.73
913.11
673.81
-9.41
-20.59
5,963,201.718
692,823.479
2.22
943.26
4.13
298.07
942.75
903.45
-8.81
-22.40
5,963,202.466
692,821.654
2.95
973.27
5.15
304.78
972.66
933.36
-7.34
-24.46
5,963,203.690
692,819.562
3.84
1,00241
6.47
310.27
1,001.65
962.35
-5.53
-26.78
5,963,205.437
692,817.189
4.91
1,032.53
7.59
313.19
1,031.55
992.25
-3.07
-29.53
5,963,207.824
692,814.382
3.90
li 1,064.46
9.07
318.29
1,063.14
1,023.84
0.25
-32.74
5,963,211.062
692,811.086
5.18
V. Sec
(usft)
0.00
0.21
0.09
-0.72
-1.91
-3.33
-4.90
-7.00
-7.BF
-8.67
-932
-976
-993
-983
-9.41
-8.61
-7.34
-5.53
-3.07
0,25
44212019 3:15:14PM Page 3 COMPASS 5000.1 Build 81D
az
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 1.2-07
Pmject:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usR (Kelly Bushing used by CDR -2)
Wall:
1.2-07
North Reference:
True
Wellbore:
L2 -07B
Survey Calculation Method:
Minimum Curvature
Design:
L2 -07B
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(1)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
1,096.63
9.83
320.44
1,094.87
1,055.57
4.26
-36.18
5,963,214.983
692,807.548
2.60
4.26
1,191.18
10.16
324.75
1,187.99
1,148.69
17.30
-46.13
5,963,227.755
692,797.264
0.86
17.30
1,288.46
10.00
328.21
1,281.80
1,242.50
31.19
-55.34
5,963,241.408
692,787.703
0.66
31.19
1,381.73
10.25
328.73
1,375.59
1,336.29
45.47
-64.10
5,963,255.453
892,778.582
0.28
4547
1,413.51
10.16
323.47
1,406.86
1,367.56
50.14
-67.23
5,963,260.040
692,775.327
2.95
50.14
1,445.12
10.06
320.18
1,437.98
1,398.68
54.50
-70.66
5,963,264.311
692,771.789
1.85
54.50
1,477.05
9.84
317.22
1,469.43
1,430.13
58.64
-74.30
5,963,268.361
692,768.045
1.74
58.64
1,572.49
10.17
312.31
1,563.42
1,524.12
70.30
-86.07
5,963,279.712
692,755.980
0.96
70.30
1,667.68
9.73
316.61
1,657.18
1,617.68
81.80
-97.81
5,963,290.909
692,743.949
0.91
81.80
1,763.43
10.13
317.50
1,751.50
1,712.20
93.89
-109.06
5,963,302.703
692,732.396
0.45
93.89
1,794.80
11.03
319.71
1,782.33
1,743.03
98.21
-112.86
5,963,306.927
692,728.482
3.15
98.21
1,826.18
12.17
320.96
1,813.07
1,773.77
103.07
-116.89
5,963,311.681
692,724.334
3.72
103.07
1,857.86
13.56
320.63
1,844.05
1,804.75
108.55
-121.36
5,963,317.046
692,719.722
4.38
108.55
1,889.80
15.56
321.47
1,874.67
1,835.57
114.78
-126.39
5,963,323.141
692,714.536
6.32
114.78
1,921.67
18.13
320.72
1,906.37
1,866.07
121.96
-132.19
5,963,330.173
692,708.550
8.09
121.96
1,953.37
20.49
322.55
1,935.29
1,895.99
130.19
-138.69
5,963,336.227
692,701.845
7.68
130.15
1,985.15
22.74
326.12
1,964.83
1,925.53
139.70
-145.49
5,963,347.565
692,694.796
8.20
139.70
2,016.78
25.15
326.13
1,993.74
1,954.44
150.36
-152.65
5,963,358.035
692,687.370
7.62
150.36
2,048.46
27.56
325.64
2,022.12
1,982.82
162.00
-160.54
5,963,369.469
692,679.185
7.64
162.00
2,080.08
30.05
325.56
2,049.83
2,010.53
174.57
-169.15
5,963,381.813
692,670.258
7.88
174.57
2,111.90
32.97
325.92
2,076.95
2,037.65
188.32
-178.51
5,963,395.312
692,660.550
9.20
188.32
2,143.71
36.05
324.56
2,103.16
2,063.86
203.12
-188.79
5,963,409.841
692,649.894
9.96
203.12
2,175.01
37.10
322.40
2,128.30
2,089.00
218.10
-199.89
5,963,424.534
692,638.413
5.31
218.10
2,206.90
37.53
320.01
2,153.66
2,114.36
233.16
-212.00
5,963,439.281
692,625.919
4.74
233.16
2,238.63
38.15
317.07
2,178.72
2,139.42
247.74
-224.89
5,963,453.526
692,612.663
6.01
24774
2,270.49
39.91
316.22
2,203.47
2,164.17
262.33
-238.66
5,963,467.752
692,598.519
5.77
262.33
2,302.44
42.49
313.39
2,227.51
2,188.21
277.15
-253.60
5,963,482.179
692,583.208
9.96
277.15
422019 3:15:14PM Page 4 COMPASS 5000.1 Build 81D
M
BP
Final Survey Report
Company:
North America - ALASKA- BP
Local Coordinate Reference:
Well 1-2-07
Project
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well.
L2-07
North Reference:
True
Wellbore:
12-0713
Survey Calculation Method:
Minimum Curvature
Design:
L2 -07B
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
AAI
TVD
Mali;
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
0
(waft)
(usft)
(usft)
(usft)
(usft)
(usft)
(•It00usft)
(usft)
2,334.38
43.23
313.61
2,250.92
2,211.62
292.10
-269.36
5,963,496724
692,567.071
2.36
292.10
2,428.76
43.03
314.03
2,319.80
2,260.50
336.78
-315.91
5,963,540.187
692,519.387
0.37
336.78
2,524.70
42.92
315.13
2,390.00
2,350.70
382.68
-362.49
5,963,584.876
692,471.645
0.79
382.68
2,556.66
42.55
316.59
2,413.47
2,374.17
398.24
-377.60
5,963,600.045
692,456.148
3.31
398.24
2,588.30
43.45
316.31
2,436.61
2,397.31
413.88
-392.46
5,963,615.297
692,440.885
2.91
413.88
2,620.09
45.73
313.91
2,459.25
2,419.95
429.68
-408.22
5,963,630.687
692,424.731
8.92
429.68
2,651.92
48.09
311.94
2,481.00
2,441.70
445.50
425.24
5,963,646.067
692,407.308
8.68
445.50
2,746.87
48.84
311.36
2,543.95
2,504.65
492.74
-478.35
5,963,691.918
692,353.008
0.91
492.74
2,842.03
49.32
312.51
2,606.29
2,566.99
540.79
-531.84
5,963,738.580
692,298.308
1.04
540.79
2,936.34
49.02
311.07
2,667.95
2,628.65
588.34
-585.04
5,963,784.749
692,243.906
1.20
588.34
3,032.53
48.61
312.73
2,731.29
2,691.99
636.68
-638.92
5,963,831.687
692,188.806
1.37
636.68
3,127.69
47.59
313.86
2,794.84
2,755.54
685.25
-690.47
5,963,878.910
692,136.027
1.39
685.25
3,222.24
46.66
316.41
2,859.18
2,819.88
734.34
-739.35
5,963,926.731
692,085.906
2.21
734.34
3,317.78
45.24
319.16
2,925.61
2,886.31
785.18
-785.50
5,963,976.360
692,038.475
2.55
785.18
3,412.63
44.80
320.56
2,992.66
2,953.36
836.46
-828.75
5,964,026.515
691,993.924
1.14
836.46
3,508.22
43.46
321.87
3,061.27
3,021.97
888.33
-870.44
5,964,077.298
691,950.912
1.70
888.33
3,603.65
43.43
322.70
3,130.56
3,091.26
940.25
-910.59
5,964,128.159
691,909.452
0.60
940.25
3,699.04
40.99
320.54
3,201.21
3,161.91
990.49
-950.35
5,964,177.365
691,868.417
2.98
99049
3,794.56
39.76
320.56
3,273.98
3,234.68
1,038.27
-989.66
5,964,224.116
691,827.890
1.29
1,038.27
3,890.11
39.68
322.74
3,347.48
3,308.18
1,086.15
-1,027.54
5,964,271.004
691,788.794
146
1,086.15
3,985.21
41.52
322.63
3,419.68
3,380.38
1,135.37
-1,065.06
5,964,319.240
691,750.029
1.94
1,135.37
4,080.23
43.67
319.23
3,489.63
3,450.33
1,185.25
-1,105.61
5,964,368.066
691,708.216
3.31
1,185.25
4,175.58
44.56
316.14
3,558.10
3,518.80
1,234.31
-1,150.29
5,964,415.958
691,662.292
2.44
1,234.31
4,271.22
4442
318.24
3,626.32
3,587.02
1,282.68
-1,196.69
5,964,463.115
691,614.671
0.16
1,282.68
4,366.93
44.14
316.09
3,694.85
3,655.55
1,330.88
-1,242.97
5,964,510.109
691,567.172
0.31
1,330.88
4,424.06
44.00
31782
3,735.89
3,696.59
1,359.87
-1,270.14
5,964,538.391
691,539.266
1.88
1,359.87
4,516.64
42.84
317.87
3,803.14
3,763.84
1,406.97
-1,312.93
5,964,584.371
691,495.283
1.27
1,406.97
41./2019 3: 15.14PM Page 5 COMPASS 5000.1 Build 81D
ee
BP
Final Survey Report
Company:
North America -ALASKA - BP
Local C000 dmate Reference:
Well 1.2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
12-07
North Reference:
True
Wellbore:
L2 -07B
Survey Calculation Method:
Minimum Curvatura
Design:
L2 -07B
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Azl
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(*1100uaft)
(usft)
4,580.64
42.51
31743
3,850.19
3,810.89
1,439.03
-1,342.16
5,964,615.670
691,465.247
0.69
1,439.03
4,674.54
43.94
317.69
3,918.61
3,879.31
1,486.49
-1,385.55
5,964,661.999
691,420.655
1.53
1,486.49
4,769.08
42.88
317.26
3,987.29
3,947.99
1,534.37
-1,429.46
5,964,708.734
691,375.533
1.16
1,534.37
4,863.85
43.44
317.82
4,05842
4,017.12
1,582.20
-1,473.22
5,984,755.420
691,330.562
0.72
1,582.20
4,956.34
44.38
318.56
4,123.05
4,083.75
1,630.05
-1,515.93
5,964,802.157
691,286.638
1.19
1,630.05
5,049.64
45.66
319.26
4,189.01
4,149.71
1,679.82
-1,559.25
5,964,850.801
691,242.052
1.44
1,679.82
5,143.59
45.04
318.66
4,255.03
4,215.73
1,730.23
-1,803.14
5,964,900.063
691,196.891
0.80
1,730.23
5,239.21
44.45
320.22
4,322.95
4,283.65
1,781.36
-1,848.91
5,964,950.050
691,151.823
1.30
1,781.36
5,331.90
45.75
318.96
4,388.38
4,349.08
1,831.34
-1,689.48
5,964,998.919
691,107.988
1.70
1,831.34
5,426.99
45.32
317.96
4,454.99
4,415.69
1,882.14
-1,734.48
5,965,048.538
691,061.699
0.87
1,882.14
5,522.09
45.07
319.37
4,522.00
4,482.70
1,932.80
-1,779.04
5,965,098.034
691,015.852
1.08
1,932.80
5,614.08
44.49
318.30
4,587.30
4,548.00
1,981.58
-1,821.69
5,965,145.702
690,971.971
1.03
1,981.58
5,645.61
44.60
318.31
4,609.77
4,570.47
1,998.09
-1,836.40
5,965,161.834
690,956.841
0.35
1,998.09
5,739.45
46.66
320.58
4,675.39
4,636.09
2,049.07
-1,879.99
5,965,211670
690,911.964
2.80
2,049.07
5,834.39
46.08
319.09
4,740.90
4,701.60
2,101.59
-1,924.30
5,965,263.029
690,866.320
1.29
2,101.59
5,926.70
45.90
322.20
4,805.05
4,765.75
2,152.91
-1,966.39
5,965,313.254
690,822.931
2.43
2,152.91
6,010.99
45.66
319.81
4,863.84
4,824.54
2,199.85
-2,004.39
5,965,359.203
690,783.739
2.06
2,199.85
6,105.90
45.48
319.01
4,930.28
4,890.98
2,251.32
-2,048.49
5,965,409.517
690,738.340
0.63
2,251.32
6,200.83
45.04
319.04
4,997.10
4,957.80
2,302.23
-2,092.70
5,965,459.271
690,692.834
0.46
2,302.23
6,297.57
44.29
319.53
5,065.91
5,026.61
2,353.77
-2,137.06
5,965,509.653
690,647.166
0.85
2,353.77
6,391.80
46.26
318.19
5,132.22
5,092.92
2,404.17
-2,181.12
5,965,558.908
690,601.836
2.32
2,404.17
6,484.31
45.53
319.08
5,196.60
5,157.30
2,454.02
-2,225.02
5,965,607.612
690,556.672
1.05
2,454.021
6,576.73
45.25
318.89
5,261.51
5,222.21
2,503.67
-2,268.19
5,965,656.129
690,512.239
0.33
2,503.67
6,669.96
44.92
318.42
5,327.33
5,288.03
2,553.23
-2,311.81
5,965,704.556
690,467.373
0.51
2,553.23
6,765.09
44.67
319.06
5,394.84
5,355.54
2,603.62
-2,356.01
5,965,753.785
690,421.895
0.54
2,603.62
6,858.42
46.15
319.06
5,460.36
5,421.06
2,653.83
-2,399.56
5,965,802.857
690,377.075
1.58
2,653.83
6,953.97
45.99
318.45
5,526.85
5,487.35
2,705.57
-2,444.92
5,965,853.416
690,330.400
0.49
2,705.57
4!2/2019 315: 14PM
Page 6
COMPASS 5000.1 Build
81D
IWO
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing
used by
CDR -2)
Site:
L2
MD Reference:
KB C 39.30usft (Kelly Bushing
used by
CDR -2)
Well:
12-07
North Reference:
True
Wellbore.
12-07B
Survey Calculation
Method:
Minimum Curvature
Design:
L2 -07B
Database:
EDM RSK- Alaska PROD -ANCP7
Survey
MD Inc
Azi
TVD
TVDSS
N/S
ENtl
Northing
Easting DLeg
V. Sec
(usft) V)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
7,049.93
45.99
318.83
5,593.32
5,554.02
2,757.37
-2490.53
5,965,904.027
690,283481
0.28
2,757.37
7,146.12
45.81
318.35
5,660.26
5,620.96
2,809.18
-2,536.22
5,965,954.641
690,236.480
0.40
2,809.18
7,2413.35
45.43
317.91
5,730.36
5,691.06
2,862.53
-2,584.03
5,966,006.739
690,187.318
0.49
2,862.53
7,341.63
45.14
317.17
5,797.40
5,758.10
2,912.48
-2,629.73
5,966,055.497
690,140.347
0.63
2,912.48
7,437.47
45.27
317.10
5,864.93
5,825.63
2,962.32
-2,676.00
5,966,104.138
690,092.817
0.15
2,962.32
7,532.78
45.29
317.04
5,931.99
5,892.69
3,011.91
-2,722.13
5,966,152.520
690,045.436
0.04
3,011.91
7,628.20
45.49
316.37
5,999.00
5,959.70
3,081.35
-2,768.71
5,966,200.744
689,997.601
0.55
3,061.35
7,724.44
44.93
315.91
6,066.81
6,027.51
3,110.59
-2,816.04
5,966,248.755
689,949.031
0.67
3,110.59
7,820.49
44.53
317.41
6,135.05
6,095.75
3,159.75
-2,862.42
5,966,296.701
689,901.399
1.18
3,159.75
7,917.00
44.33
317.83
6,203.97
6,164.67
3,209.66
-2,907.96
5,966,345.420
689,854.602
0.37
3,209.66
8,012.17
44.04
316.44
6,272.22
6,232.92
3,258.27
-2,953.08
5,966,392.862
689,808.253
1.07
3,258.27
8,101.34
44.22
320.11
6,336.23
6,296.93
3,304.60
-2,994.38
5,968,438.109
689,765.775
2.88
3,304.60
8,198.14
43.57
315.82
6,406.00
6,366.70
3,354.44
-3,039.29
5,966,486,773
689,719.608
3.15
3,354.44
8,293.89
43.08
316.12
6,475.66
6,436.36
3,401.67
-3,084.95
5,966,532:818
689,672.753
0.56
3,401.67
8,388.56
42.76
314.92
6,544.99
6,505.89
3,447.67
-3,130.11
5,966,577.639
689,626.423
0.93
3,447.67
8,485.09
44.72
318.05
6,614.74
6,575.44
3,496.07
-3,176.03
5,966,624.847
689,579.285
3.02
3,496.07
8,580.20
44.14
318.25
6,682.66
6,643.36
3,545.67
-3,220.44
5,966,673.281
689,533.612
0.63
3,545.67
8,676.15
44.42
319.71
6,751.36
6,712.06
3,596.21
-3,264.41
5,966,722.674
689,488.370
1.10
3,596.21
8,773.09
44.35
318.02
6,820.64
6,781.34
3,647.27
-3,309.01
5,966,772.574
689,442.473
1.22
3,647.27
8,869.36
43.93
319.62
6,889.73
6,850.43
3,697.73
-3,353.15
5,966,821.873
689,397.050
1.24
3,697.73
8,965.93
46.33
319.51
6,957.85
6,918.55
3,749.81
-3,397.54
5,966,872.800
689,351.342
2.48
3,749.81
9,062.30
45.19
317.81
7,025.09
6,985.79
3,801.65
-3,443.13
5,966,923.445
689,304439
1.73
3,801.65
9,156.46
44.88
317.99
7,091.64
7,052.34
3,851.08
-3,487.79
5,966,971.709
689,258.528
0.36
3,851.08
9,252.37
44.68
317.49
7,159.72
7,120.42
3,901.08
-3,533.22
5,967,020.524
689,211.836
0.42
3,901.08
9,347.43
44.13
316.62
7,227.63
7,188.33
3,949.77
-3,578.53
5,967,068.037
689,165.291
0.86
3,949.77
9,443.68
44.19
318.34
7,296.68
7,257.38
3,999.19
-3,623.85
5,967,116.271
689,118.725
1.24
3,999.19
9,537.90
44.86
319.44
7,363.86
7,324.56
4,048.96
-3,667.29
5,967,164.913
689,074.025
1.09
4,048.96
41WO19 Z
15 14P
Page 7
COMPASS 5000.1 Build
81D
EEO
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 12-07
Project:
Lisburne
TVD Reference:
KB (a7 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
12-07
North Reference:
True
Wellbore:
1-2-07B
Survey Calculation Method:
Minimum Curvature
Design:
12-078
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MDInc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
(usft)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°It00usft)
9,634.19
320.43
7428.86
7,389.56
4,103.31
-3,712.96
5,967,218.069
689,026.970
5.58
9,730.40
320.10
7,490.09
7,450.79
4,160.38
-3,760.40
5,967,273.894
688,978.091
0.64
9,825.97
320.51
7,551.36
7,512.06
4,216.81
-3,807.24
5,967,329.106
688,929.815
1.34
9,923.16
319.73
7,615.12
7,575.82
4,273.10
-3,854.27
5,967,384.166
688,881.364
1.21
10,018.00
318.72
7,676.08
7,636.78
4,328.10
-3,901.72
5,967,437.928
686,632-518
3.29
10,113.60
319.12
7,736.81
7,697.51
4,383.75
-3,950.23
5,967,492.306
688,782.598
2.02
10,144.93
319.11
7,757.68
7,718.38
4,401.41
-3,965.52
5,967,509.571
688,766.858
8.75
10,176.28
319.29
7,779.65
7,740.35
4,418.34
-3,980.13
5,967,526.119
688,751.815
8.59
10,208.76
319.59
7,803.47
7,764.17
4,435.11
-3,994.49
5,967,542.572
688,737.037
8.37
10,240.86
318.83
7,827.73
7,788.43
4,451.03
-4,008.22
5,967,558.071
688,722.901
3.73
10,272.95
318.74
7,852.27
7,812.97
4,466.59
-4,021.85
5,987,573.274
688,708.880
1.51
10,305.42
318.34
7,877.54
7,838.24
4,481.86
-4035.34
5,967,588.196
688,695.001
6.27
10,337.76
319.46
7,90344
7,864.14
4,496.45
-4,048.07
5,967,602.453
688,681.899
7.02
10,369.97
318.81
7,929.68
7,890.38
4,510.58
-4,060.29
5,967,616.260
688,669.321
1.97
10,402.07
320.32
7,956.18
7,916.88
4,524.36
-4,072.04
5,967,629.735
688,657.222
5.87
10,434.30
320.80
7,983.36
7,944.06
4,53773
-4,083.04
5,967,642.818
688,645.882
6.35
10,466.13
321.13
8,010.62
7,971.32
4,550.49
-4,093.39
5,967,655.312
688,635.209
2.54
10,498.60
322.45
8,038.89
7,999.59
4,563.04
-4,103.26
5,967,667.601
688,625.004
7.75
10,530.98
321.42
8,067.54
8,028.24
4,574.92
-4,112.58
5,967,679.233
686,615.407
3.43
10,563.28
322.41
8,096.31
8,057.01
4,586.47
-4,121.63
5,967,690.551
688,606.057
1.97
10,599.58
324.13
8,128.76
8,089.46
4,598.51
-4,131.36
5,967,703.337
688,595.994
2.33
10,625.55
325.58
8,152.01
8,112.71
4,608.98
-4,138.03
5,967,712.627
688,589.091
2.49
10,657.83
27.34
326.16
8,180.79
8,141.49
4,621.07
-4,146.22
5,967,724.506
688,580.588
2.79
10,690.11
326.67
8,209.40
8,170.10
4,633.53
-4,154.49
5,967,736.747
688,571.999
1.77
10,721.98
328.61
8,237.55
8,198.25
4,646.15
-4,162.49
5,967,749.180
688,563.681
2.93
10,741.68
329.90
8,254.90
8,215.60
4,654.13
-4,167.24
5,967,757.014
688,558.733
3.18
10,807.44
328.98
8,312.99
8,273.69
4,680.71
-4,182.93
5,967,783.176
688,542.369
0.98
50.19
50.75
48.57
48.49
51.51
49.80
46.88
44.17
41.48
40.37
39.89
37.87
35.70
35.19
33.57
31.48
30.89
28.26
27.26
28.81
26.46
26.48
27.86
28.07
28.22
27.74
V. Sas
(usFp
4,703.31
4,160.38
4,216.81
4,273.10
4,328.10
4,383.75
4,401.41
4,418.34
4,435.11
4,451.03
4,466.59
4,481.86
4,496.45
4,510.58
4,524.36
4,537.73
4,550.49
4,563.04
4,574.92
4,586.47
4,589.51
4,608.98
4,621.07
4,633.53
4,646.15
4,654.13
4,680.71
422019 3.15 14PM Page 8 COMPASS 5000.1 Build 81D
102
Company:
North America - ALASKA - BP
Project•
Lisburne
Ste:
L2
Well:
1-2-07
wellbore:
1-2-078
Design:
L2 -07B
Survey
MID
Wait)
10,839.79
10,871.79
10,904.16
10,924.00
10,945.52
10,976.82
11,005.56
11,035.47
11,067.06
11,095.62
11,125.53
11,155.61
11,185.77
11,210.65
11,233.98
11,260.40
11,290.59
Tie-in Point
11,310.00
KOP
11,346.17
11,370.22
11,401.76
11,434.28
11,461.11
11,490.46
11,520.05
Inc
(1)
24.90
22.42
21.61
23.50
25.59
31.65
36.83
41.77
47.16
53.22
60.76
68.16
76.44
83.25
87.76
86.53
87.11
BP
Final Survey Report
86.46
345.03
8,603.12
8,563.82
4,963.44
Local Co-ordinate Reference:
5,968,060.651
Well 12-07
688,334.722
13.19
4,963.44
90.12
343.61
8,604.20
8,564.90
TVD Reference:
-4,393.16
5,968,095.188
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
10.85
4,998.24
89.69
342.63
8,604.24
MD Reference:
5,021.25
-4,400.15
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
888,316.491
4.45
5,021.25
88.93
341.88
North Reference:
8,565.32
5,051.29
True
5,968,147.792
688,306.112
3.39
5,051.29
86.59
340.65
Survey Calculation Method:
8,566.59
Minimum Curvature
-4,420.19
5,968,178.283
688,294.890
8.13
5,082.06
85.29
Database:
8,607.79
8,568.49
EDM R5K - Alaska
PROD - ANCP1
5,968,203.241
Aid
688,285.237
TVD
TVDSS
1415
E/W
Northing
8,571.47
Easting
DLeg
V. Sec
(°)
688,274.119
(usft)
(usft)
("t)
(usft)
(usft)
8,574.87
(usft)
(°NQOusft)
(usft)
321.32
688,262.071
8,342.00
8,302.70
4,692.48
-4,191.07
5,967,794.737
688,533.930
13.67
4,692.48
311.43
8,371.32
8,332.02
4,701.78
4,199.86
5,967,803.810
688,524.904
14.60
4,701.78
300.96
8,401.34
8,362.04
4,708.94
-4,209.60
5,967,810.711
688,514.981
12.36
4,708.94
297.89
8,419.66
8,380.36
4,712.67
-4,216.23
5,967,814.270
688,508.258
11.22
4,712.67
302.84
8,439.23
8,399.93
4,717.20
-4,223.93
5,967,818.599
688,500.446
13.62
4,717.20
308.26
8,466.70
8,427.40
4,725.96
-4,236.07
5,967,827.044
688,488.085
21.05
4,725.96
311.95
8,490.46
8,451.16
4,736.39
-4,248.40
5,967,837.160
688,475.486
19.42
4,736.39
315.13
8,513.60
8,474.30
4,749.46
-4,262.11
5,967,849.867
688,461.451
17.82
4,749.46
320.06
8,536.14
8,486.84
4,785.81
4,276.98
5,967,865.833
688,446.163
20.25
4,765.81
321.91
8,554.42
8,515.12
4,782.86
-4,290.77
5,967,882.519
688,431.940
21.79
4,782.86
323.68
8,570.70
8,531.40
4,802.83
-4,305.92
5,967,902.094
688,416.292
25.69
4,802.83
327.08
8,583.66
8,544.36
4,825.16
-4,321.30
5,967,924.020
688,400.339
26.63
4,825.16
328.38
8,592.83
8,553.53
4,849.44
4,336.62
5,967,947.894
688,384.402
27.76
4,849.44
332.44
8,597.21
8,557.91
4,870.72
-0,348.70
5,967,968.859
688,371.785
31.73
4,870.72
337.12
8,599.04
8,559.74
4,891.75
4,358.60
5,967,989.628
688,361.347
27.81
4,891.75
339.86
8,600.36
8,561.06
4,916.30
4,368.27
5,968,013.916
688,351.046
11.36
4,916.30
342.55
8,602.03
8,562.73
4,944.83
4,377.98
5,968,042.190
688,340.607
9.10
4,944.83
86.46
345.03
8,603.12
8,563.82
4,963.44
4,383.39
5,968,060.651
688,334.722
13.19
4,963.44
90.12
343.61
8,604.20
8,564.90
4,998.24
-4,393.16
5,968,095.188
688,324.063
10.85
4,998.24
89.69
342.63
8,604.24
8,564.94
5,021.25
-4,400.15
5,968,118.013
888,316.491
4.45
5,021.25
88.93
341.88
8,604.62
8,565.32
5,051.29
-4,409.76
5,968,147.792
688,306.112
3.39
5,051.29
86.59
340.65
8,605.89
8,566.59
5,082.06
-4,420.19
5,968,178.283
688,294.890
8.13
5,082.06
85.29
340.00
8,607.79
8,568.49
5,107.26
-4,429.20
5,968,203.241
688,285.237
541
5,107.26
83.05
338.17
8,610.77
8,571.47
5,134.53
-4,439.63
5,968,230.235
688,274.119
9.83
5,134.53
83.75
336.37
8,614.17
8,574.87
5,161.64
-4,450.98
5,968,257.043
688,262.071
649
5,161.64
4,W019 3:15:14PM Page 9 COMPASS 5000.1 Build 81D
40,11,11, BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
Site:
12
MD Reference.
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
Well:
L2-07
North Reference:
True
Wellbore:
L2 -07B
Survey Calculation Method:
Minimum Curvature
Design.
L2 -07B
Database:
EDM RSK-
Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft 1
11,550.42
85.45
340.36
8,617.03
8,577.73
5,189.74
-0,462.13
5,968,284.845
688,250.210
14.23
5,189.74
11,580.50
83.57
344.15
8,619.91
8,580.61
5,218.25
4,471.25
5,968,313.110
688,240.357
14.01
5,218.25
11,610.20
83.04
345.96
8,623.37
8,584.07
5,246.75
-4,478.86
5,968,341.402
688,232.021
6.31
5,246.75
11,840.83
82.67
348.48
8,627.18
8,587.88
5,276.38
-4,485.58
5,968,370.854
688,224.541
8.25
5,276.38
11,671.22
83.19
351.77
8,630.93
8,591.63
5,306.09
4,490.75
5,968,400.418
688,218.609
10.88
5,306.09
11,700.53
83.59
354.49
8,634.30
8,595.00
5,335.00
4,494.23
5,968,429.221
688,214.386
9.32
5,335.00
11,732.69
83.29
357.43
8,637.98
8,598.68
5,366.86
4,496.48
5,968,461.017
688,211.318
9.13
5,366.86
11,760.71
83.93
0.47
8,641.09
8,601.79
5,394.70
4,495.99
5,968,488.831
688,210.094
11.02
5,394.70
11,791.91
84.52
3.06
8,644.23
8,604.93
5,425.72
4,496.04
5,968,519.868
688,210.254
8.47
5,425.72
11,822.46
86.31
4.48
8,646.68
8,607.38
5,456.11
4,494.04
5,968,550.292
688,211.476
7.47
5,456.11
11,851.02
88.96
7.89
8,647.86
8,608.56
5,484.47
4,490.96
5,968,578.722
688,213.821
15.11
5,484.47
11,883.75
89.48
11.22
8,648.30
8,609.00
5,516.74
4,485.53
5,968,611.117
688,218.423
10.30
5,516.74
11,919.35
89.38
14.94
8,648.86
6,609.36
5,551.41
-4,477.47
5,968,645.979
688,225.584
10.45
5,551.41
11,940.52
90.00
16.78
8,648.77
8,609.47
5,571,77
4,471.69
5,968,686.483
688,230.845
9.17
5,571.77
11,971.15
88.62
19.58
8,649.14
8,609.84
5,600.87
-4,462.13
5,968,695.812
688,239.649
10.19
5,600.87
12,004.89
89.48
22.46
8,649.70
8,610.40
5,632.35
4,450.04
5,968,727.597
688,250.935
8.91
5,632.35
12,030.53
89.35
25.03
8,649.96
8,810.66
5,655.82
-4,439.71
5,968,751.319
688,260.652
10.04
5,655.82
12,060.79
89.17
27.23
8,650.35
8,611.05
5,682.98
-4,426.39
5,968,778.814
688,273.274
7.29
5,682.98
12,094.55
88.93
29.96
8,650.91
8,611.61
5,712.62
-4,410.23
5,968,808.853
688,288.662
8.12
5,712.62
12,123.07
90.00
33.63
8,651.18
8,611.88
5,736.85
4,395.21
5,968,833.464
688,303.057
13.40
5,736.85'
12,151.73
90.37
37.51
8,651.08
8,611.78
5,760.16
4,378.54
5,968,857.190
688,319.121
13.60
5,760.16'
12,180.64
91.04
40.47
8,850.73
8,611.43
5,782.63
4,360.36
5,968,880.114
688,336.723
10.50
5,782.63
12,210.45
89.69
42.00
8,650.54
8,611.24
5,805.04
4,340.71
5,968,903.026
688,355.788
6.84
5,805.04
12,240.47
88.22
44.91
8,651.09
8,611.79
5,826.83
4,320.07
5,988,925.333
688,375.862
10.86
5,826.83
12,270.59
91.51
49.33
8,651.16
8,611.86
5,847.32
4,298.00
5,968,946.379
688,397.390
18.29
5,847.32
12,300.74
89.88
52.79
8,650.79
8,611.49
5,866.26
4,274.56
5,968,965.918
688,420.339
12.68
5,866.26
12,330.42
90.28
56.05
8,650.75
8,611.45
5,883.53
4,250.42
5,968,983.797
688,444.022
11.07
5,883.53
4/2/2019 3.15.14PM
Page 10
COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America -ALASKA -BP
Local Co-ordinate
Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by
CDR -2)
Well:
1-2-07
North Reference:
True
Wellbore:
L2-0713
Survey Calculation Method:
Minimum Curvature
Design:
1-2-0713
Database:
EDM RSK-
Alaska
PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°NOOusft)
(usft)
12,363.16
92.46
61.37
8,649.97
8,610.67
5,900.52
-4,222.47
5,969,001.501
688,471.533
17.56
5,900.52
12,393.58
93.10
65.75
8,648.49
8,609.19
5,914.05
-4,195.27
5,969,015.719
688,498.375
14.53
5,914.05
12,417.15
91.14
68.28
8,647.62
8,608.32
5,923.24
4,173.59
5,969,025.468
688,519.811
13.57
5,92324
12,450.72
90.12
72.06
8,647.25
8,607.95
5,934.63
4,142.01
5,969,037.659
688,551.078
11.66
5,934.63
12,480.74
91.14
76.56
8,646.92
8,607.62
5,942.74
4,113.12
5,969,046.514
688,579.751
15.37
5,942.74
12,510.83
88.22
76.14
8,647.09
8,607.79
5,949.84
4,083.89
5,969,054.361
688,608.794
9.80
5,949.84
12,540.73
87.82
79.95
8,648.12
8,608.82
5,956.03
-4,054.66
5,969,061.298
688,637.852
12.80
5,956.03
12,569.71
90.77
82.98
8,648.48
8,609.18
5,960.33
-4,026.01
5,969,066.331
688,666.381
14.59
5,960.33
12,600.68
89.63
84.38
8,648.37
8,609.07
5,963.74
-3,995.23
5,969,070.529
688,697.062
5.83
5,963.74
12,630.52
92.12
87.96
8,647.91
8,608.61
5,965.73
-3,965.46
5,969,073.285
608,726.762
14.61
5,965.73
12,662.01
92.67
90.78
8,646.60
8,607.30
5,966.08
-3,934.01
5,969,074.439
688,758.198
9.12
5,966.08
12,693.79
91.57
94.79
8,645.42
8,606.12
5,964.54
-3,902.29
5,969,073.710
688,789.939
13.08
5,964.54
12,725.92
91.72
99.12
8,644.50
8,605.20
5,960.65
-3,870.42
5,969,070.642
688,821.899
13.48
5,960.65
12,752.14
91.78
100.43
8,643.70
8,604.40
5,958.20
-3,844.59
5,969,066.857
688,847.830
5.00
5,956.20
12,783.64
93.35
98.85
8,642.29
8,602.99
5,950.93
-3,813.57
5,969,062.386
688,878.976
7.07
5,950.93
12,810.53
92.61
95.56
8,640.89
8,601.59
5,947.56
-3,788.93
5,969,059.703
688,905.689
12.52
5,947.56
12,840.61
92.39
93.43
8,639.58
8,600.28
5,945.21
-3,756.98
5,969,058.118
688,935.696
7.11
5,945.21
12,872.74
90.86
91.30
8,638.67
8,599.37
5,943.88
-3,724.89
5,969,057.617
688,967.804
8.16
5,943.88
12,900.84
89.57
89.31
8,638.56
6,599.26
5,943.73
-3,696.79
5,969,058.189
668,995.894
8.44
5,943.73
12,930.33
89.14
86.76
8,638.89
8,599.59
5,944.74
-3,667.32
5,969,059.956
689,025.325
8.77
5,944.74
12,960.69
89.97
84.45
8,639.13
8,599.83
5,947.07
-3,637.06
5,969,063.059
689,055.521
8.08
5,947.07
12,990.69
88.62
82.49
8,639.50
8,600.20
5,950.48
-3,607.25
5,969,067.233
689,085.223
7.93
5,95048
13,020.63
86.93
7943
8,640.66
8,601.36
5,955.18
-3,577.71
5,969,072.689
689,114.632
11.67
5,955.18
13,053.16
87.76
78.45
8,642.17
8,602.87
5,961.41
-3,545.82
5,969,079.739
689,146.351
3.95
5,961.41
13,080.42
89.02
82.12
8,642.93
8,603.63
5,966.01
-3,518.97
5,969,085.024
689,173.076
14.23
5,966.01
13,110.62
90.06
86.58
8,643.18
8,603.88
5,968.98
-3,488.93
5,969,088.766
689,203.032
15.16
5,968.98
13,143.57
91.66
92.04
8,642.68
8,603.36
5,969.38
-3,455.99
5,969,090.008
689,235.940
17.27
5,969.38
422019 315: 14PM Page 11 COMPASS 5000.1 Build 81D
RE,
BP
Final Survey Report
Company:
North America - ALASKA- BP
Local Co-ordinate Reference:
Well 1-2-07
Project:
Lisburne
TVD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Site:
L2
MD Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
Well:
12-07
North Reference:
True
Wellbore:
L2 -07B
Survey Calculation Method:
Minimum Curvature
Design:
L2 -07B
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting
DI -eq
V. Sec
(usft)
(°)
(°)
(usft)
Waft)
(usft)
(usft)
(usft)
(usft)
(°NOOusft)
(usft)
13,173.09
91.20
96.50
8,641.94
5602.64
5,967.18
-3426.57
5,969,088.567
689,265.406
15.18
5,967.18
13,203.14
89.72
101.32
8,641.70
8,602.40
5,962.53
-3,396.90
5,969,084.678
689,295.191
16.78
5,962.53
13,230.56
87.33
102.91
8,642.41
8,603.11
5,956.78
-3,370.10
5,969,079.616
689,322.126
10.47
5,956.78
13,260.59
90.89
106.83
8,642.88
8,603.58
5,949.07
-3,341.09
5,969,072.661
689,351.323
17.63
5,949.07
13,290.43
90.49
105.90
8,642.52
8,603.22
5,940.67
-3,312.46
5,969,064.992
689,380.156
3.39
5,940.67
13,320.52
89.39
102.72
8,642.55
8,603.25
5,933.23
-3,283.31
5,969,058.307
689,409.488
11.18
5,933.23
13,355.61
90.15
100.17
8,642.69
8,603.39
5,926.27
-3,248.92
5,969,052.230
689,444.042
7.58
5,926.27
13,380.56
91.69
98.62
8,642.29
8,602.99
5,922.20
-3,224.31
5,969,048.791
689,468.748
8.76
5,922.20
13,413.42
91.17
95.79
8,641.47
8,602.17
5,918.08
-3,191.72
5,969,045.510
689,501.428
8.75
5,918.08
13,445.94
90.67
92.79
8,640.94
8,601.64
5,915.65
-3,159.30
5,969,043.911
689,533.899
9.35
5,915.65
13,470.45
89.48
91.44
8,640.91
8,601.61
5,914.74
-3,134.81
5,969,043.635
689,558.405
7.34
5,914.74
13,505.99
91.75
90.76
8,640.53
8,601.23
5,914.06
-3,099.28
5,969,043.865
689,593.937
6.67
5,914.06
13,531.00
90.64
89.88
8,640.01
8,600.71
5,913.92
-3,074.28
5,969,044.368
689,618.935
5.66
5,913.92
13,561.35
91.17
91.00
8,639.53
8,60023
5,913.69
-3,043.93
5,969,044.914
689,649.274
4.08
5,913.69
13,590.94
88.31
92.34
8,639.66
8,600.36
5,912.82
-3,014.36
5,969,044.811
689,678.858
10.67
5,91282
13,620.08
86.78
90.12
8,640.91
8,601.61
5,912.20
-2,985.25
5,969,044.933
689,707.966
9.25
5,912.2C
13,650.81
90.92
90.85
8,641.53
8,602.23
5,911.94
-2,954.54
5,969,045.461
689,738.677
13.68
5,911.94
13,686.98
91.78
91.09
8,841.15
8,601.85
5,911.67
-2,938.37
5,969,045.603
689,754.841
5.52
5,911.67
13,703.00
91.78
91.09
8,640.03
8,600.73
5,910.98
-2,902.38
5,969,045.842
689,790.840
0.00
5,910.98
Projection to TD
422019 3: 15:14PM Page 12 COMPASS 5000.1 Build BID
m
PmJeW: Llsbw
n..u.em.x.
wy;wex.m.n. ,ry
WELLBORE DETAILS: L2 -07B raweB'sMuwArw
I
L2 -07B ca++aa ((w Relmwa WsILf.o7. uwx
WWI: 1.2
sy Snl�
IAean
V.fmllMll Rel.ance Sw L.rel
WWbms: LZOM�
L2.07BPB1
AWUY: L2 -07B
em+.mveieatl
uwwnaomu Pd.e.n: �l0"ONE, MUAwmWCOR
Twos MD: 1128059
agilflon uanm: wrmmc.vaLu.
by
North America - ALASKA - BP
Lisburne
L2
L2-07
L2 -07B
L2 -07B
AOGCC Offset Well Report
07 May, 2019
� se
Company: North America - ALASKA - BP
Project: Lisburne
Reference Site: 12
Site Error: O.00usft
Reference Well: 12-07
Well Error: O.00usft
Reference Wellbore 1-2-07B
Reference Design: 1-2-07B
BP
Anticollision Report
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
Mean Sea Level
MO Reference:
KB @ 39.30usft (Kelly Bushing used by CDR -2)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K-Alaska PROD -ANCP1
Offset TVD Reference:
Offset Datum
Reference
L2 -07B
Filtertype:
NO GLOBAL FILTER: Using user defined selection & fhering criteria
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program
Date W12019
From
To
(usft)
(usR) Stairway (Wellbore)
Tool Name
Description
180.03
4,367.032: MWD - Standard (L2-07)
MWD
MWD -Standard
4,424.06
10,904.163: MWD+ IFR [Alaska](L2-07)
MWD+IFR:AK
MWD +IFR[Alaska]
10,924.00
11,290.59 Survey #1(L2-07BPB1)
MWD
MWD -Standard
11,310.00
13,703.00 Survey #1(L2-0713)
MWD
MWD - Standard
&72019 10:06:33AM Page 2 of 3 COMPASS 5000.1 Build BID
BP
by Anticollision Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 12-07
Project:
Lisburne
TVD Reference:
Mean Sea Level
Reference Site:
1.2
MD Reference:
KB Q 39.30us6 (Kelly Bushing used by CDR -2)
Site Error:
O.00usR
North Reference:
True
Reference Well:
L2-07
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
L2 -07B
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
L2 -07B
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
18
18-11 - 16-11 B - 18-11 B
11,957.02
14,025.00
156.42
18-11-18-11 BPB2-18-11BPB2
12,006.50
14,050.00
213.46
18-11-18-118PB3-18-11 BPB3
12,003.48
14,050.00
209.35
18-11 - PLAN 18-11C CTD Concept Lateral - 18-11C CTD Concept Lateral
12,006.50
14,050.00
213.46
L1
L2
12-03 - 12-03 - 1-2-03
860.67
875.05
121.19
12-03 - L2 -03A - 1-2-03A
862.36
875.00
121.23
12-06 - 12-06 - 1-2-08
459.59
475.00
183.24
1-2-07 - 12-07 - 1-2-07
11,210.44
11,375.00
238.57
12-07-L2-07BPB1-L2-07BPB7
12,507.32
12,409.00
43.30
12-08 - 1-2-08 - 1-2-08
316.65
325.00
179.49
12-08 - 1-2-08A- 1.2-08A
310.28
325.00
179.40
1.2-08 - PLAN 1-2-08B - L2 -08B WPOB
310.28
325.00
179.40
12-10 - 12-10 - 1-2-10
340.68
350.00
198.44
12-11 - 1-2-11 - 1-2-11
1,345.61
1,350.00
102.53
12-11 - 1-2-11 PB1 - 1-2-11 PB1
1,345.61
1,350.00
102.53
12-11 - L2-11PB2 - L2-11PB2
1,345.61
1,350.00
102.53
12-13 - 1-2-13 - 1-2-13
1,824.32
1,825.00
101.75
1-2-13 - L2 -13A- 12-13A
1,826.86
1,825.00
101.79
L2 -14 -L2 -14-L2-14
1,546.33
1,550.00
270.02
12-14 - L2 -14A- L2 -14A
1,546.33
1,550.00
270.02
L2 -14 -L2 -14B -L2 -14B
1,546.33
1,550.00
270.02
12-14 - L2 -14C - 12-14C
1,546.33
1,550.00
270.02
L2 -16 -L2 -16-L2-16
1,904.28
1,900.00
308.20
12-20 - 1-2-20 - 1-2-20
2,150.00
2,125.00
340.25
12-20-1.2-20PB1-1-2-20PB1
2,150.00
2,125.00
340.25
L2-21 - 1.2-21 - L2-21
2,275.00
2,225.00
215.27
L2 -21 -L2 -21A -L2 -21A
2,275.00
2,225.00
215.27
L2 -21 -L2 -21B -L2 -21B
2,275.00
2,225.00
215.27
L2-24 - 1-2-24 - 12-24
2,244.77
2,200.00
408.17
1-2-25 - 1-2-25 - 12-25
2,600.00
2,525.00
249.97
12-29 - 1-2-29 - 12-29
2,555.98
2,425.00
353.47
L2 -29 -L2 -29A -L2 -29A
2,555.96
2,425.00
353.47
12-29 - L2-29PB1 - 1-2-29PB1
2,555.98
2,425.00
353.47
1-2-33 - 1-2-33 - L2-33
2,681.85
2,525.00
418.71
Not
51712019 10..06:33AM Page 3 of COMPASS 5000.1 Build 81D
Printed 517/1019 9'.43'.13AM
North America - ALASKA - BP
Page 1 or 2
Cementing Report
Common Well Name: L2-07 / 04
Report no.: 1 Report date: 4/3/2019
Project Lisburne
— - Site:
l2 -- -
-- - Spud DateRms: 8/28/1988
Event Type: COM- ONSHORE (CON)
Siert Date: 4/2/2019 End Date: 4114/2019
AFE No.:
Contractor NABORS ALASKA DRILLING INC. Rip
NameMo.: CDR -2 Rig Release:
X3 -0198F -C: (1,303,615.00 )
BPUOI: USA00001105
Active datum: KB �38.30usft (above Mean Sea Leve0
General Information
Job type: Primary
Cement job start date/time: 4/3/2019 7:30PM
Job end date/time: 4/4/2019 12,00AM
Cement Company: SCHLUMBERGER
Cementer: DYLAN WAUGH
Cemented String: PRODUCTION LINER 1
String Size: 2.875 (in)
String Set TMD: 13,703.00 (usft) Hole Size: 4.250 (in)
Pipe Movement
Pipe Movement. NO MOVEMENT
Rotating Time (Start -End).
RPM:
Rotating Torque (initlavg/max): (ft -16)
Reciprocating Time (Start -End).
Recip Drag Up/Down: - (kip)
SPM: Stroke Length.
Field Name: CEMENT
Fluids (1 of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
LEAD SLURRY Density: 15.30 (ppg)
Yield: 1.3100 (ft3lak)
Mix Water Ratio:
4.306 (gallskg4) Excess:
10.00(%) Mix Method
Sacks Used: 155.00 (9411p sacks)
Water Volume:
15.9 (bbi) Excess Slurry Volume:
3.3 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
36.2 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type'.
Density:
PV:
YP: Viscosity:
Gels 10 Sec:
Gels 10 Min:
Addftives
Name
Type
Amount
Units
Concentration Unit
D163
CEMENT
5.000 %BWOC
D047
ANTIFOAMAGENT
0.100 GAUSX
D206
ANTIFOAMAGENT
0.100 GAUSX
D065
DISPERSANT
1.000 %BWOC
D600 G
GAS -BLOCK
1.500 GAUSX
D167
FLUID LOSS
0.100 %BWOC
77
Fluid Teets
Thick time
Thick Free water
Free water
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp Comp
Comp Strength
Comp Strength
(hr)
temp. (%)
temp.
ac/30min)
temp.
press.
Strength
Strength
Strength Strength Time
Pressure 2
Temperature 2
('F)
('F)
("F)
(psi)
Time 1
Pressure 1
Temperature 1 2
(psi)
(°F)
min
°F (min)
6.38
90.00 0.00
80.00
40.0
168,001
1
Printed 517/1019 9'.43'.13AM
Printed 5!7/2019 9:43:13AM
North America - ALASKA- SP
Page 2 of 2
Cementing Report
Common Well Name: L2-07 / 04
Report no.: 1 Report date: 4/3/2019
Project Lisburne
Spud Date/Time: 6/28/1898
Event Type: COM- ONSHORE (CON)
- Start Date: 4/2/2019 End Date: 4/14/2019
AFE No.:
Contractor: NABORS ALASKA DRILLING
INC.
Rig Name/No.: CDR-2 Rig Release:
X3-0196F-C: (1,303,615.00)
BPUOI: USA00001105
_
_
Active datum: KB @39.30usft (above Mean Sea Level)
Sages
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
Top
Bottom
plug
Pressure
Bost
Pressure
Returns
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rate
Press.
Plug
Plug
I
Bumped
I
Bumped
Hem
Held
Prior
Surface
Mud Lost
Flow
(gpm)
(psi)
(hr)
(bbl)
(bbl)
After
(psi)
(min)
1
PRIMARYCEMENT
13,703.001
1y
plunphig Schedule
Fluid pumped
Volume Avg.
Max Disp.
Slurry Top Slurry Base Start Mix Cml Start Slurry
Pumping end
Start Disp Foam Gas Type
Gas Vol
BH circ.
Bh static
Pumped Disp.
Rate
TMD TMD Pmp
date/time
job
Used
temp.
temp.
(bbl)
Rate
(bbl/min)
(usft) (usft)
(sco
(bbl/min
Test
Casing Test
Shoe Test
Liner Top Test
Test Pressure: (psi)
FIT/LOT:
(ppg)
Liner Overlap:
(usft)
Time: (min)
Tool:
N
Positive Test:
(Ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar:
N
Open Hale Length:
(usft)
Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr)
Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top:
(usft)
Under Pressure: (psi)
How Determined
Bond Quality:
TOC Sufficient :
N
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required:
N
His Prior to Log: (hr)
How Determined:
Printed 5!7/2019 9:43:13AM
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Ryan Ciolkosz
Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.alaska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L2-0713
BP Exploration (Alaska), Inc.
Permit to Drill Number: 218-139
Surface Location: 1315' FSL, 3802' FEL, SEC. 18, TI IN, RI 5E, UM
Bottomhole Location: 1967' FSL, 1496' FEL, SEC. 12, T1 IN, R14E, UM
Dear Mr. Ciolkosz:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
DATED this° day of October, 2018.
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS4
PERMIT TO DRILL
20 AAC 25.005
la. Type of Work:1b.
Proposed Well Class. Exploratory - Gas [IService - WAG ❑ Service - Disp❑
1c. Specify if well is proposed for:
Drill 11Lateral ❑
Stratigraphic Test ❑ Development - Oil 0' Service -Winj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hydrates❑
Redrill 0 J Reentry ❑
Exploratory - Oil ❑ Development- Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 - Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU 1-2-0713
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage. AK 99519-0612
MD: 13962' TVD: 8599'ss
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well Governmental Section):
( )
7. Property Designation (lease Number):
ADL 028321, 028307 & 028302 -
8 DNR Approval Number.
13. Approximate spud date:
Surface: 1315' FSL, 3802' FEL, Sec. 18, T11N ,R15E, UM
620' FSL, 3389' FEL, Seo. 12, T11 N, R14E, UM
84-62
December 15, 2018
Top of Productive Horizon:
9. Acres in Property: 2480 & 2560
14. Distance to Nearest Property:
Total Depth: 1967' FSL, 1496 FEL, Sec. 12, T11 N ,R14E, UM
25000
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10, KB Elevation above MSL: 39.30 feet
15. Distance to Nearest Well Open
Pool:
Surface: x- 692844 ' y- 5963212 Zone - ASP 4
GL Elevation above MSL: 11.80 feet
2 game
16. Deviated wells: Kickoff Depth: 10924 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 92 degrees
Downhole: 3407 ' Surface: 2567
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casino Weiqht Gmde I Courilina Len th
MD I TVD TVD (including stage data)
4-1/4" 3-1/2"x3-1/4" 9.2#16.6# L-80 STL/TC11 3132'
10830' 8294'ss 13962' 8599'ss 180 sx Class'G' ✓
X2-718" /6.5# IST
19 PRESENT WELL CONDITION SUMMARY (To be completed for Rednll and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measurad):
Effect. Depth MD (ft):
Effect. Depth ND (it):
Junk (measured):
12956 8657
10583,11764
10583
8114
12921
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 2(' 260 six Arctic Set (Approx.) 27-107 27-107
Surface 4395 9-5/8' 350 sx PF'E', 210 sx Cass'G'. 1948 sx PF'E'. 200 sx 1 27-4422 27-3734
Intermediate 10760 7' 552 sx Class'G' 25-10785 25-8293
Liner 445 4-1/2" 143 sx Class'G' 10590 - 11035 8120-8519
Liner 2002 3-112'x8-3/16'.2-Il8^ 189 sx Class'G' 10954 - 12956 8447-8657
Perforation Depth MD (ft): 11575 - 12880 Perforation Depth TVD (ft): 8639-8659
Hydraulic Fracture planned? Yes ❑ No 0 '
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Ciolkosz. Rvan R
from without prior written approval.
Contact Email Ryan.CiolkoszC�bp.com
Authorized Name Ciolkosz, Ryan R
Authorized Title Drilling Engineer Contact Phone +1 907 564 5977
Authorized Signature Date j UI Z 3/ 1 Q
.1
Commission Use Only
Permit to Drillq
v8'/�/
API: 50- 029-22910-02-00
Per Approval
See cover letter For other
Number:
Date:
requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed inne, s hydrates, or gas contained in shales: E
Q.✓n✓t to
/fdPETESLTC7sbcpa?7 AR amples req'd: Yes ❑/ No Mud log req'd: Yes No
Other: SSSplesni
O
� .❑J
/Q/1W re-�,cI ,,,��✓f��.=lr`vk ��Dte✓e��Y H2S measures Ves f3 No ❑ Directional svy req'tl: Yes la No ❑
/
V
r20 A4c ZqS ; /�z�w + Spacing exception req'd: Yes ❑ No Inclinationonly svy ni Yes ❑ No U/
/U • V99 -7 ie S a v/�/ ry w Post initial injection MIT req'tl: Yes ❑ No ❑
/
APPROVEDBY
Approved by: COMMISSIONER THE COMMISSION Date: 10 I3D le
' 6o/�„zY/
'FAy -s01 Revised 5/2017 This permit is valid fiZAL royal (20 AAMCG25.P00"i ubm8Fnand
Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Ryan Ciolkosz Rig: CDR2 by
CTD Engineer Target Reservoir: Ivishak Zone 1 �N
Date: October 23, 2018
Re: L2 -07B Permit to Drill Request
Approval is requested for a permit to drill a CTD sidetrack from well 1-2-07A. 1_2-07A is a 2004 Z1A/B Ivishak
CTD lateral from 12-07 (which was a 1998 Z1A/B Ivishak producer). The well has a production casing leak at
7380' MD. This will need to be repaired prior to sidetracking the well via a packer cement squeeze. Parent well,
L2 -07A has no remaining value and there are no good opportunities to add new perforation to improve well
performance.
Proposed plan: Drill a through tubing sidetrack with the CDR 2 Coiled Tubing Drilling rig on or around
December 15th, 2018. Slickline will pull the dummy GLV from station #3. E -line unit will set a CBP and a
cement retainer over the open GLM. Service coil will then perform a packer squeeze to repair the IA leak at
7380'. Coil will then mill out the cement and cement retainer and slickline will log the cement. A CIBP will be
set to isolate the L2 -07A wellbore and a CTD whipstock will be set pre -rig CDR 2 will mill a 3.80" window in
the 4-1/2" liner and drill an Ivishak well in Zone 1: The lateral will be completed with a 3-1/2" x 3-1/4' x 2-7/8"
L-80 liner which will be cemented and perforated.
CTD Drill and Complete L2 -07B program: Rig Start Date: Dec 25th, 2018
Pre -Rig Work: (scheduled to begin Sept 15'h, 2018)
1. S: Pull X plug at 10,583' MD, Pull GLV from station #3
2. E: Set CBP & Pressure test, Set Cement Retainer
3. C: IA Cement Squeeze
4. C: Mill cement and plug
5. F: MIT -IA
6. S: Dummy WS drift, Memory SCMT
7. E: Set CIBP, Set Whipstock 5v n1D2Y 3/g-�$�
8. F: A/EL Pressure test whipstock/ MIT -T
9. V: Tree Work
Rig Work: I
1. MIRU and test BOPE to 250 psi low and 3,500 psi high. (MASP: 2545)
2. Mill 3.80" window and 10' of rathole. Swap to 8.6 drilling mud
3. Drill 4-1/4" Build and lateral with GR/Resistivity to TD
4. Run 3-1/2" x 3-1/4" x 2-7/8" L-80 liner
5. Pump primary cement leaving TOC at TOL'. 37.2 bbls of 15.3 ppg liner cmt planned
6. Test liner lap to 2,400 psi.
7. Run RPM log and Perforate Liner
8. Freeze protect well, set BPV, RDMO
Post -Rig Work:
V: Install second swab (so CTU can RDMO post N2 lift and keep well flowing). Tree work.
Pull TWC/BPV if necessary
S: Set solid 4.5" LTP with PTSA stinger (if fail liner lap PT on rig)
F: Assist SL PT LTP (if set)
CT: N2 lift (no GLMs that are deep enough to kick off)
5. V pending: remove secc,,.j swab
6. E pending: shoot 20' Sag perls for in-situ gas lift (if well cannot flow naturally on its
7. S pending : set extended (-40'), 4.5" LTP with sliding sleeve and changeable orific(
situ gas lift). Set in closed position. SL open sliding sleeve after passing PT.
8. F pending: PT LTP.
9. CT pending: N2 lift after in-situ LTP is set
* Approved alternate plug placement per 20 AAC 25.112(i)
5C. 1'� �Vrr
Mud Program:
• Well kill: 8.4 ppg brine.
• Milling/drilling: 8.6 ppg drilling fluid for milling window and drilling (352 psi over -balance )
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 4.25"
Liner Program:
• 3-1/2", 9.2#, L-80, STL Solid Liner 10,830' MD - 10,870' MD
• 3-1/4", 6.6#, L-80, TC -II Solid Liner 10,870' MD — 11,700' MD
• 2-7/8", 6.5#, L-80, STL Solid Liner 11,700' MD — 13,962' MD
• A minimum of 37.2 bbls of 15.3 ppg cement will be used for liner cementing. (TOC =TOL)
• The primary barrier for this operation: a minimum EMW of 8.4 ppg. -
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional
• See attached directional plan. Maximum planned hole angle is 91°.
• Magnetic and inclination surveys will be taken every 30 ft.
• Distance to nearest property — 25,000'
• Distance to nearest well within pool — 200'
Logging
• MWD directional, Gamma Ray and Resistivity will be run over the entire open hole section.
RPM log will be run inside the production liner prior to perforating.
Perforating:
• 2" MaxForce, 1-1/4" CSH work string
• The primary barrier for this operation: a minimum EMW of 8.4 ppg.
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures
• All wells pass BP Anti -Collison Risk Requirements. The planned L2 -07B Trajectory is within
148ft of the 18-11 B wellbore. There is no expected significant reservoir pressure differential
between L2 -OB and 18-11 B wellbore. The L2 -07B well is being drilled solely within the same
reservoir as 18-11 B is completed.
Hazards j
• L2 pad is an H2S pad.
Reservoir Pressure
The reservoir pressure is expected to be 3,407 psi at 8,407' TVDSS. (7.6 ppg equivalent).
Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,567 psi.
An EMW of 8.4 ppg for this well will provide 265 psi over -balance to the reservoir.
Managed Pressure Drilling —
• MPD techniques may be used to improve hole stability. t
An automatic choke w maintain a target ECD at the window or the duration of drilling to
improve hole stability.
A pressure schedule will be used for tripping In/Out of the hole. The purpose of the pressure
schedule for tripping is to maintain the same bottom hole pressure at the window by applying
surface pressure via the choke.
At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only
being used for hole stability.
Ryan Ciolkosz CC: Well File
CTD Engineer Joseph Lastufka
North America - ALASKA - BP
Lisburne
L2
L2-07
PLAN L2-0713
Plan: L2-0713 WP03
BP Coil Tubing Report
22 October, 2018
Company:
North America - ALASKA - BP
Project:
Lisburne
Site:
L2
Well:
12-07
Wellbore:
PLAN 1-2-078
Design:
1-2-0713 WP03
BP
BP Coil Tubing Report
Local Coordinate Reference:
Well 1-2-07
TVD Reference:
Mean Sea Level
MD Reference:
KB Q 39.30usft (ORIG KELLY BUSHING) -
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project Lisburne, GPMA, LISBURNE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Gap, Datum: NAD27' OGP-Usa AK [4287'15884] ° Using Well Reference Point
Map Zone: NAD27 - OGP-Usa AK / Alaska zone 4 126734.1586, ° Using geodetic scale factor
Site
L2, TR -11-15
Site Position:
689,322.350 usft
From:
Map
Position Uncertainty:
0.00 usft
Well
L2-07, 1-2-07
Well Position
+N/ -S 0.00 usft
-E/-W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
PLAN L2 -07B
Magnetics
Model Name Sample Date
BGGM2018 1/1/2019
Design
L2 -07B WP03
Audit Notes:
Version:
Phase:
Vertical Section:
Depth From (TVD)
(usft)
-1443
Northing:
5,957,405.920 Usti,
Easting:
689,322.350 usft
Slot Radius:
0.000 in
Northing:
5,963,211.650 usft '
Easting:
692,843.820 usft "
Wellhead Elevation:
14.43 usft
Declination
Dip Angle
17.13
80.9
PLAN Tie On Depth:
-N/-S -E/-W
(usft) (usft)
0.00 0.00
Latitude:
Longitude:
Grid Convergence:
Field Strength
(nn
6 57,440
10,904.16
Direction
(°I
80.00
Latitude:
Longitude;
Ground Level:
70° 17' 18.046 N
148' 28'2.759 W
1.44 °
70' 18' 14.250 N
148' 26'15.842 W
' 11.80usft
10/222018 4:47.20PM Page 2 COMPASS 5000 1 Build 81D
Company: North America - ALASKA - BP
Project: Lisburne
Site: 12
Well: 12-07
Wellbore: PLAN 1.2-078
Design: 1-2-0713 WP03
Survey Tool Program Date 10/22/2018
From To
(usft) (usft) Survey (Wellbore)
180.03 4,367.032: MWD - Standard (L2-07)
4,424.06 10,904.16 3! MWD + IFR [Alaska] (1-2-07)
10,904.16 13,962.08 1-2-07B WP03 (PLAN 1-2-07B)
Planned Survey
MD Im;
26.00
An
TVDSS
(usft) (°)
36.53
V)
(usft)
10,904.16
21.61
300.96
8,362.04
1.2-07 Actual Suvey - TIP
5,987,837.308
688,472.571
MD Reference:
10,924.00
23.50
297.89
8,380.36
KOP
57.89
North Reference.
319.12
10,942.25
25.00
299.53
8,397.00
TCGL
78.62
Method:
324.98
10,944.00
25.14
299.68
8,398.58
Start DLS 22.00 TFO 25.00
EDM R5K - Alaska PROD - ANCP1
10,984.00
33.31
306.44
8,433.47
Start DLS 22.00 TFO
26.00
Local Coordinate Reference:
Well 12-07
11,000.00
36.53
22.00
308.94
11,009.34
3843
Mean Sea Level
310.23
BCGL
5,987,837.308
688,472.571
MD Reference:
11,100.00
57.34
KELLY BUSHING)
318.93
11,102.63
57.89
North Reference.
319.12
23SS
22.00
11,200.00
78.62
Method:
324.98
11,234.50
86.00
688,422.814
326.78
SWR Tum 12.03
EDM R5K - Alaska PROD - ANCP1
16.00
11,241.50
86.00
-4,354.85
327.62
22TS
22.00
MWD
11,284.50
86.00
8,556.51
332.79
21TS/Fauft #1
MWD+IFR:AK
MWD + IFR
(Alaska]
BP
BP Coil Tubing Report
8,446.59
4,733.00
Local Coordinate Reference:
Well 12-07
688,477.040
22.00
TVD Reference:
25.00
Mean Sea Level
4,736.62
-4,251.31
5,987,837.308
688,472.571
MD Reference:
22.00
KB Q 39.30usft (ORIG
KELLY BUSHING)
22.95
8,514.59
4,784.06
North Reference.
5,967,883.529
True
22.00
-3,402.33
Survey Calculation
Method:
Minimum Curvature
-4,299.83
5,967,885.170
688,422.814
Database:
EDM R5K - Alaska PROD - ANCP1
16.00
Tool Name
Description
-4,354.85
5,967,954.825
688,365.990
22.00
MWD
MWD - Standard
15.90
8,556.51
4,885.12
-4,374.01
MWD+IFR:AK
MWD + IFR
(Alaska]
22.00
-3,459.27
13.70
MWD
MWD -Standard
4,377.79
5,967,988.376
688,342.180
NIS
E1W
Northing
Easting
DLeg
V. Sec TFace
4,399.10
(usft)
(usft)
(usft)
(usft)
(°Moousft)
(usft) (°)
90.18
4,708.94
-4,20960
5,967,810.711
688,514.981
0.00
-3,327.95
0.00
4,712.67
-4,216.23
5,967,814.270
688,508.258
11.22
-3,333.83
-33.36
4,716.27
-4,222.80
5,967,817.703
688,501.598
9.00
-3,339.68
25.00
4,716.64
-4,223.45
5,967,818.052
688,500.942
9.00
-3,340.25
23.50
4,727.39
-4,239.70
5,967,828.384
688,484.422
22.00
-3,354.38
25.00
8,446.59
4,733.00
-4,246.94
5,967,833.801
688,477.040
22.00
-3,360.54
25.00
8,454.00
4,736.62
-4,251.31
5,987,837.308
688,472.571
22.00
-3,364.22
22.95
8,514.59
4,784.06
-4,298.37
5,967,883.529
688,424.314
22.00
-3,402.33
21.93
8,516.00
4,785.74
-4,299.83
5,967,885.170
688,422.814
22.00
-3,403.47
16.00
8,551.90
4,856.84
-4,354.85
5,967,954.825
688,365.990
22.00
-3,445.31
15.90
8,556.51
4,885.12
-4,374.01
5,967,982.605
688,346.112
22.00
-3,459.27
13.70
8,557.00
4,890.99
4,377.79
5,967,988.376
688,342.180
12.00
-3,461.97
90.02
8,560.00
4,928.21
4,399.10
5,968,025.032
688,319.922
12.00
-3,476.50
90.18
102212018 4:47:20PM Page 3 COMPASS 5000.1 Build 81D
BP
3
BP Coil
Tubing Report
Company: North America
- ALASKA - BP
Local Coordinate Reference:
Well 1-2-07
Project: Lisburne
TVD Reference:
Mean Sea Level
Site: L2
MD Reference:
KS @ 39.30usft (ORIG KELLY BUSHING)
Well: L2-07
North Reference:
True
Wellbore: PLAN L2 -07B
Survey Calculation
Method:
Minimum Curvature
Design: L2 -07B WP03
Database:
EDM RSK- Alaska
PROD -ANCP1
Planned Survey
MD Inc
An
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
TFace
(waft) (°)
(°)
(usft)
(u6ft)
(usft)
(usft)
(usft)
(°I100usft)
(waft)
(')
11,300.00
86.00
334.66
8,561.08
4,942.07
-4,405.95
5,968,038.711
688,312.725
1200.
-3,480.83
90.08
11,400.00
86.00
346.69
8,568.05
5,036.03
-4,438.90
5,968,131.790
688,277.368
12.00
-3,496.97
90.42
11,500.00
86.00
358.72
8,575.03
5,134.80
-4,451.56
5,968,230.193
688,262.187
12o0
-3,492.28
90.42
11,514.50
86.00
0.46
8,576.04
5,149.26
-4,451.66
5,968,244.645
688,261.711
12.00
-3,489.87
90.06
Start DLS 12.00 TFO -90.00
11,556.94
86.02
355.35
8,579.00
5,191.55
-4,453.21
5,968,286.883
688,259.081
12.00
-3,484.05
-90.00
14N-7000
11,600.00
86.06
350.17
8,581.98
5,234.15
-4,458.61
5,968,329.332
688,252.580
12.00
-3,481.98
-89.64
11,664.50
86.20
342.42
8,586.34
5,296.62
-4,473.85
5,968,391.386
688,235.750
12.00
-3,486.13
-89.29
Start DLS 12.00 TFO 89.60
11,700.00
86.24
346.69
8,588.68
5,330.76
-4,483.28
5,968,425.270
688,225.444
12.00
-3,489.49
89.50
11,767.18
86.39
354.77
8,583.00
5,396.88
-4,494.08
5,968,491.080
688,212.956
12.00
-3,488.64
89.22
TDF
11,800.00
86.49
358.71
8,595.04
5,429.57
-4,495.94
5,968,523.713
688,210.254
12.00
-3,484.80
88.70
11,900.00
86.89
10.72
8,600.84
5,528.86
4,487.74
5,968,623.196
688,215,898
12.00
-3,459.48
88.45
12,000.00
87.42
22.73
8,605.82
5,624.36
4,459.05
5,968,719.371
688,242.127
12.00
-3,414.65
87.76
12,100,00
88.07
34.72
8,609.77
5,711.82
-4,411.12
5,968,808.033
688,287.797
12.00
-3,352.26
87.16
12,200.00
88.80
46.70
8,812.52
5,787.46
4,346.04
5,968,885.309
688,350.910
12.00
-3,275.03
86.68
12,300.00
89.58
58.68
8,613.94
5,847.95
-4,266.66
5,968,947.821
688,428.709
12.00
-3,186.35
86.36
12,352.19
90.00
64.92
8,614.13
5,872.60
-4,220.69
5,968,973.639
688,474.027
12.00
-3,136.80
86.19
Start DLS 12.00 TFO 87.00
12,400.00
90.30
70.65
8,614.00
5,890.67
-4,176.44
5,968,992.834
688,517.794
12.00
-3,090.09
87.00
12,500.00
90.91
82.64
8,612.94
5,913.72
4,079.33
5,969,018.370
688,614278
12.00
-2,990.45
87.02
12,600.00
91.49
94.63
8,610.84
5,916.10
-3,979.56
5,969,023.310
688,713.945
12.00
-2,891.78
87.14
12,682.20
91.91
104.49
8,608.39
5,902.48
-3,898.64
5,969,011.768
688,795.182
12.00
-2,814.46
87.39
Start DLS 12.00 TFO.92.00
12,700.00
91.84
102.35
8,607.81
5,898.35
-3,881.33
5,969,008.084
688,812.589
12.00
-2,798.13
-92.00
12,800.00
91.37
90.36
8,605.01
5,887.31
-3,782.17
5,968,999.594
688,911.999
12.00
-2,702.39
-92.07
1012212018 4:47:20PM
Page 4
COMPASS 5000.1 Build
BID
1,020
Company:
North America - ALASKA - BP
Project:
Lisburne
Site:
L2
Well:
L2-07
Wellbore:
PLAN L2 -07B
Design:
L2 -07B WP03
Planned Survey
Well 12-07
MD
Inc
(usR)
(°)
12,900.00
90.84
12,962.20
90.49
Start DLS 12.00
TFO 90.00
13,000.00
90.48
13,100.00
90.47
13,200.00
90.43
13,242.20
90.40
Start DLS 12.00
TFO -90.00
13,300.00
90.40
13,400.00
90.38
13,500.00
90.35
13,522.20
90.34
Start DLS 12.00
TFO 91.00
13,600.00
90.17
13,700.00
89.95
13,800.00
89.73
13,802.20
89.73
Start DLS 12.00
TFO, .90.00
13,900.00
89.73
13,962.20 •
89.74
TD at 13962.20
5,939.36
BP
BID Coil Tubing Report
Local Coordinate Reference:
Well 12-07
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 39.30usft (ORIG KELLY BUSHING)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Azi
TVDSS
NIS
FJW
Northing
Basting
DLeg
V. Sec
TFace
(°)
(usft)
(usR)
lush)
(waft)
(usR)
('Moll
(usR)
(I
78.36
8,603.08
5,897.11
-3,682.85
5,969,011.948
669,011.025
12.00
-2602.88
-9241
70.91
8,602.36
5,913.58
-3,622.93
5,969,029.945
689,070.506
12.00
-2,541.00
-92.64
75.45
8,602.04
5,924.52
-3,586.75
5,969,041.807
689,106.387
12.00
-2,503.48
90.00
87.45
8,601.21
5,939.36
-3,488.05
5,969,059.182
689,204.671
12.00
-2,403.70
90.04
99.45
8,600.42
5,933.36
-3,388.41
5,969,055.741
689,304.420
12.00
-2,306.62
90.14
104.51
8,600.12
5,924.61
-3,347.15
5,969,048.050
689,345.891
12.00
-2,267.50
90.23
97.57
8,599.71
5,913.55
-3,290.45
5,969,038445
689,402.851
12.00
-2,213.59
-90.00
85.57
8,599.02
5,910.81
-3,190.67
5,969,038.267
689,502.660
12.00
-2,115.80
-90.05
73.57
8,598.38
5,928.87
-3,092.51
5,969,058.845
689,600.326
12.00
-2,015.99
-90.13
70.91
8,598.25
5,935.64
-3,071.37
5,969,066.154
689,621.280
12.00
-1,994.00
-90.21
80.24
8,597.90
5,955.00
-2,996.10
5,969,087.437
689,696.022
12.00
-1,916.51
91.00
92.24
8,597.80
5,961.54
-2,896.50
5,969,096.530
689,795.418
12.00
-1,817.29
91.04
104.24
8,598.08
5,947.23
-2,797.72
5,969,084.763
689,894.533
12.00
-1,722.49
9105
104.50
8,598.09
5,946.68
-2,795.59
5,969,084.273
689,898.673
12.00
-1,720.49
91.02
92.77
8,598.55
5,932.02
-2,699.06
5,969,072.097
689,993.538
12.00
-1,627.97
-90.00
85.30
8,598,63
_ 5,933.07
-2,638.92
5,969,074.738
690,055.629
12.00
-1,566.59
-89.94
10/22/2018 4:47:20PM Page 5 COMPASS 5000.1 Build 81D
by
BP
BP Coil Tubing Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 12-07
Project:
Lisburne
TVD Reference:
Mean Sea Level
Site:
L2
MD Reference:
KB @ 39.30usft (ORIG KELLY BUSHING)
Well:
1-2-07
North Reference:
True
Wellbore:
PLAN 12-0713
Survey Calculation Method:
Minimum Curvature
Design:
12-0713 WP03
Database:
EDM RSK- Alaska PROD -ANCP7
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
Irish)
(usft)
Comment
10,904.16
8,362.04
4,708.94
-4,209.60
L2-07 ACtual Suvey - TIP
10,924.00
8,380.36
4,712.67
-4,216.23
KOP
10,944.00
8,398.58
4,716.64
-4,223.45
Start DLS 22.00 TFO 25.00
10,984.00
8,433.47
4,727.39
4,239.70
Start DLS 22.00 TFO 25.00
11,234.50
8,556.51
4,885.12
4,374.01
Start Turn 12.03
11,514.50
8,576.04
5,149.26
4,451.66
Start DLS 12.00 TFO-90.00
11,664.50
8,586.34
5,296.62
4,473.85
Start DLS 12.00 TFO 89.50
12,352.19
8,614.13
5,872.60
4,220.69
Start DLS 12.00 TFO 87.00
12,682.20
8,608.39
5,902.48
-3,898.64
Start DLS 12.00 TFO -92.00
12,962.20
8,602.36
5,913.58
-3,622.93
Start DLS 12.00 TFO 90.00
13,242.20
8,600.12
5,924.61
-3,347.15
Start DLS 12.00 TFO -90.00
13,522.20
8,598.25
5,935.64
-3,071.37
Start DLS 12.00 TFO 91.00
13,802.20
8,598.09
5,946.68
-2,795.59
Start DLS 12.00 TFO -90.00
13,962.20
8,598.83
5,933.07
-2,636.92
TD at 13962,20
10222018 4.'4720PM Page 6 COMPASS 5000.1 Build 81D
North America - ALASKA - BP
Lisburne
L2
L2-07
PLAN L2 -07B
L2 -07B WP03
Anticollision Summary Report
22 October, 2018
102
Company:
North America - ALASKA - BP
Project:
Lisburne
Reference Site:
L2
Site Error:
0.00usft
Reference Well:
12-07
Well Error:
0.00usft
Reference Wellbore
PLAN L2 -07B
Reference Design:
L2 -07B WP03
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well L2-07
Mean Sea Level
KB @ 39.30usft (ORIG KELLY BUSHING)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
L2 -07B WP03
Centre to
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
10,904.16 to 13,96220usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,593.73usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 1 0/2212 01 8
Centre to
No -Go
From
To
Measured
Measured
(usft)
(usft) Survey Wellbore)
Tool Name
DescdpNon
180.03
4,367.032: MWD - Standard (L2-07)
MWD
MWD -Standard
4,424.06
10,904.163: MWD+ IFR [Alaska](L2-07)
MWD+IFR:AK
MWD + IFR [Alaska]
10,904.16
13,962.08 L2 -07B WP03 (PLAN 1-2-0713)
MWD
MWD - Standard
SRe Name
Offset Well - Wellbore - Design
18
18-11 - 18-11 B - 18-11 B
18-11 - 18-11 BPB2 - 18-11 BPB2
18-11 - 18-11 BPB3 - 18-11 BPB3
L1
L7-01 - L7-01 - L1-01
L7-01 - Floral 19 L7 -01A- Plan #119
L2
1-2-07 - 12-07 - 1-2-07
1-2-07 - L2 -07A- 1-2-07A
L2-07 - L2-07AP61 - L2-07APB1
1-2-21 - 1.2-21 - 1-2-21
1-2-25 - L2-25 - 12-25
1-2-29 - 12-29 - 12-29
NGI
NGI-01 - NGI-01 - NGI-01
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
(usft)
11,939.64
13,975.00
136.08
8.17
133.34
Pass - Minor 1/50
11,972.31
13,975.00
193.08
12.87
191.38
Pass - Minor 1150
11,972.39
13,975.00
189.01
12.89
187.30
Pass - Minor 1150
11,804.16
11,50000
632.00
343.03
290.64
Pass - Major Risk
11,179.16
13,000.00
477.66
346.22
208.05
Pass - Major Risk
11,204.16
11,325.00
190.21
0.35
190.21
Pass-NOERRORS
11,204.16
12,150.00
1,010.50
1.89
1,010.50
Pass-NOERRORS
10,925.00
10,925.00
0.00
0.36
0.00
Pan -NOERRORS
Out of range
Out of range
Out of range
13,957.43
8,925.00
1,167.09
220.74
1,051.94
Pass -Major Risk
10/222018 1:57.20PM Page 2 of COMPASS 5000.1 Build 81D
Jolk BP
bp Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Project:
Lisburne
TVD Reference:
Reference Site:
L2
MD Reference:
Site Error:
O.00usft
North Reference:
Reference Well:
1-2-07
Survey Calculation Method:
Well Error:
O.00usft
Output errors are at
Reference Wellbore
PLAN -2-07B
Database:
Reference Design:
12-078 WP03
Offset TVD Reference:
Well 1-2-07
Mean Sea Level
KB @ 39.30usft (ORIG KELLY BUSHING)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference Depths are relative to KB Q 39.30usft (ORIG KELLY Coordinates are rela9ve to: 1-2-07
Offset Depths are relative to Onset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Centrel Meridien is 150' 0' 0.000 W' Gntl Convergence at Surface is: 1.47'
Ladder Plot
$ L2-29,L2-29PB1,L2-29PB1 V1
$ 1-2-29,1-2-29,1-2-29V1
t L2-29,L2-29A,L2-29AV0
$ 18-11,18-11BPB2,18-11BPB2VO
-0- 18-11,18-11 BPB3,18-11 BPB3 VO
-14- 18-11, 1B -11B, 1811 BVO
-} 18-18,18-18B, 1B-1BBV4
-F 12-13,12-134,1-2-13AV3
-6- L2 -13,L2 -13,L2 -13V1
-0- 1-2-10,12-10,1-2-10V1
MeaW0dL�C8p1M500 uslUn)
-F L2 -14,L2 -14,L2-14\/3
-1&- 1-2-14,1-2-14A,-2-14AV3
-9- 1-2-07,1-2-07A, 1-2-07AV4
$ L2-07, L2-07APB1, L2-07APB1 V1
$ L2 -07,1-2-07,1-2-07V15
$ 1-2-21,12-21,12-21 V2
-F 1-2-21,1-2-21A,12-21AV6
-1&- 12-21,1-2-218,12-21BVO
-i&- 1-1-01,1_11-01.1-1-01\13
-t- 1-1-01, Plan#119 L1-01 A,Plan #119V2
$ L2 -08,L2 -08,L2 -08V1
�F 1-2-11,1-2-11 PB1,12-11PB1 V1
-� 1-2-11,12-11PB2, 1-2-11 PB2V2
1-2-11,1-2-11,1-2-11 V2
$ L2 -03,L2 -03,L2 -03V1
$ 12-03,1-2-034,12-03AV6
$ 1-2-16,1-2-16,1-2-16 V1
-4- NGI-01, Nl1, NGI-01 V2
-E- 1-233,1-233,1-233 V1
-Ar L2 -24,L2 -24,L2 -24V1
10/222018 1:57:20PM Page 3 of 3 COMPASS 5000,1 Build 81D
by
Project: Lisburne
WELLBORE DETAILS: PUN L2-0713 nEBHiE INFQ TLTN
�' a
�PL2-0713
nlN'B7NNNSne WaRU47T=Nw
wall:
lieee
IINDIPdam®'. B S.LW6
WYIWM PUN L2.07B
S (vs)Naaenm W.DWNom
Parent WallOme: L2-07 8b.Mo,fl8eNaw'8S@39IDw(M1DBELYBL6MWlPlm:
L2.07B WP03
y�l/lV
Te On MD:10904.16 alaebn844a1 u6..C...
f
6800
F
oMCI
N
800
0 0
5400
0SZW
O
5000
4800
4600
4400
IDA,0
WELL DETAILS: U47
GmudLena[ 1180
♦W.S
+E/ -W
wft,
an������
Eft
LO#w.
WngA e
000
000
5853311850
892&3620 7P19'16250N
140°2515842W
RN
SECTIONDETAILS
ANNOTATIONS
Sec
MD
Inc
Ali
wTVD
.N -S -EIV
Dag
TFace VSect Target
SSTVD MO An0066W
1
10904.16
21.61
300.96
936204
4708.94 .4209.60
0.00
0.00-3327.95
8362.04 10904.16 _2.07AcWalSWay-TP
2
10924.00
23.50
297.89
8360.36
471267 -4216.23
11.22
.3336-3333.83
8380.36 10924.00 KOP
3
10944.00
25.14
299.68
8398.58
4716.64 -4223.45
9.00
25.00.3340.25
8398.58 10944.00 Sbn DLS22.D0TF025.D0
4
10984.00
3331
306.44
8433.47
472739 423970
2200
25.00-3354.38
a433.47 4984,00 StanDLS2200TFO25.00
5
1128.50
86.0032678
8556.51
4885.12 -4374.01
22.00
25.00-3459.27
855651 11234.50 San Tum1203
6
11514.50
86. OD
0.46
8576.04
514916 41451.66
12.00
90.00-3489.87
8576.04 11514.50 StutDS12.00TFO.90.00
7
11664.50
86.20
8242
8586.8
5296.62 -447385
12.00
-90.00-3486.13
858681166450 StanDLS12.00TF08950
12352,19
90.00
64.92
8614.13
5872.60 4220.69
12.00
89.50-3136.80
8614.13 1235219 SWDLS12.00TF087.00
9
12682.20
91.91
104.49
8608.39
5902.48 -3898.64
12.00
87.00.2814.46
8608.39 12682.20 SbODLS12.DOTFO-9200
10
1296220
90.49
7091
8602.36
591358 -362293
12.00
-92.00-2541.0)
860236 1296220 SOOLS12007090.00
11
13242.20
90.10
104.51
8600.12
592461 .387.15
12.00
9000 .2267.50
$600.12 13242.20 SbnDLS12.W TFO-90.00
12
13522.20
90.8
70.91
8598.25
593544 -3071.37
12.00
.90.00-1994.00
8598.25 13522.20 SWADLS 1200TF091.00
13
13802.20
8973
10150
8598.09
5946.68 -7795.59
12.00
9100.1720.49
8598.09 13802.20 SW OLS1200 TF040.00
14
13962.20
89.74
85.30
859B.83
593307 .2636.92
12.00
-90.00-156659
8598.07 13962.20 TOatl3962.20
f
6800
F
oMCI
N
800
0 0
5400
0SZW
O
5000
4800
4600
4400
IDA,0
-5200 -5000 48W 4600 4400 42M 4M0 -38M -3600 -34M -3200 -3000 -2800 -2600 -24M .2200 -2000 -IBM -16W
West( -)/East(+) (200 usillin)
an������
RN
P�-m�ON
���1
ME
P
8200
-
IlNE
��i�'�
I �-
�==Muf
..N
I�..s�■�
P>-
�■.....ON�
-5200 -5000 48W 4600 4400 42M 4M0 -38M -3600 -34M -3200 -3000 -2800 -2600 -24M .2200 -2000 -IBM -16W
West( -)/East(+) (200 usillin)
Vertical Section at 80.000(100 usNin)
RN
P
8200
-
I �-
11
Mlwl
rry=
Y
BI
- -
3
UL31 WTF
100 D)
� _-�
JI/2'14
WIOW1
84M
Su DLS 12
XT 9.50\
Sun ULS'2
Wlh 2300
.EL]1i 11 121,
UTi
�T
1.2
.W
8503
111
.mJ rin
.
7M
,e6W
-
I 1
i
1
1
1.322W 11025W
87M
87M
Sw
-
nM
12wl
0-92
1
Sun
LS I2U
n`0- 00
woo
12.7 O.W
Sunl)I.S l2 WI108]LO
HT
89
.Jtk&1
89M
4000
y9M
MEW
- JE00 4100 .Poro -24`0 .3803
-34100 -lUA
-3500
34W
-llW -]200 -IICO -lqp
391q
33041
-E]0]
-E6M
-2500
SAU
3100
-2Lp
-2100 30.'U
-IWO
.1300
-IJOJ
-1600 -1503
-1400
-11.0ILIO
-1100
.10[O
.9.p
.800
-700
6C0 S.
Vertical Section at 80.000(100 usNin)
Project: UsOWru ANTFC=SION SETTINGS COMPANY DETABS. NOMAnlerica-ALASKA-BP
t� BNa: Lt IMerpolat al elhad MD,MWM1:2BOD CakulatlOn McMaO: NSnbilumCuNaNre BAT(ER
�r Wall. L20T Dep9i Range From: 10904.18To13%220 Ermr Gyatem ISCVYSA GHES
"'���1NN��� Results LimiMO By: Centre Disern e:1593,73 Snn WKM. T2v. Cylinder NoM
Wellbore: PLANET-078, Rek7aace: Plan: U-07B WP03 (L2-07NLAN LT-078) Error &alace: E llp6cel Conk GE company
Plan: LS478 WP03 (L2-07IPLAN L2478) Waaa, McNaa'. Rubs eased
c
N
an
Lr
L2-07
Ladder Plot
18-11BPB3
18-118
18-110PB2
L2 -07B WP03
1 BPB2 / 18-11 BPB3
Possible Magnetic Interference from:
KOP to 11,100'MD
b O W A N . J . N O W A lT O) J (D fP O W A IT Qi J m IP O
O O O O O O Op O O O O O O O O O O O Op O O O O O O Op Op O O O
O O O O O O O O O O O O O O O O O O p O O O O O p O O O
Measured Depth (100 usft(n)
- L2-29, L2-29PB1, L2-29PB1 V1
- U-13. L2.13, L2-13"
- L?W, L2-07PP81. U47VB1 VI
- U-08, 1248A, 12-084 V2
-12-16, 12-18, U-16 V1
- L2-29, U-29, L2-29 V1
-12-10, 1-10, L2-10 V1
-1?07.1107. L207 V15
-12-08. PLAN l2-1)68. L2L6B WA70
W- NGWI.NGI-01, NGI-01 W
-L2-29,12-29A L2 -29A W
u L2-05,12-0812-06 V4
- L2-21, L2-21,1231 VL
- U-08. L2-08, U48 V1
- L2-33, 1?33, 1233 Vt
-1&11, 1811 3PB2 1811 3PB2 W
-U-14, 1b14C. U -14C W
-U21, L2 -21A U -21A W
-L2-11, L2 11P91, U-ilMl V1
-12-24. ETN, L2-24 V1
-15-01. 15 -fl BP03, 18-11BPB3 W
-12-14, 12-149.U-14BW
-L221, U -21R L2 -21B W
-12-11, 4-11P62, 12-11M W
-U-20. L PBI L230PB1 Vl
18-1113, 18-119 V0
-1.2-14 L2-14, L&u V3
-u-0t. a-01, L141 %3
-IStt U-11 1 11 W
- 12-20, L2-20. L230 V1
-18-18,15-158, WOW
+L2-14, 1244A, U-14AW
-L1-01, PlaM119 1-1-01A Plan M19W-L2-0 L2-03, L2-03 V1
-12-07B Wfl13
-12-13. L2 -13A L2 -13A V3
- L2-07, 1207A 1 WA V4
- 12-25, 1235,1235 V1
-L203, uzL L2-03AV8
From Colour To MD
10904
11100
11100
11300
11300
11800
11800
12100
12100 -
13962
S6RY£YPRWMM
oWT Ilo, oertll To 5,$'o,Tool
180.03 AP5703 Y: MND-SbgaE n2-0]1 'Am
M24.0e 10900.1. ]: MVA+IFRINnlul(,?07) MM.JMIK
10900.18 13902N UARBW IPIANuvs) MWD
18-118PB3 34 0
1Q-11BPB2 1
L rn o 30 I' u 12-07A 1 3 v
LEGEND '22 -11 L2- A¢� 140
35 0
90 a 16n, Ian BPe2. IbnePe2 v0 ' @N, @N, @07-
a 1611, IaIIBPB], 1611BP0] VO w L141, L"I, L1-01 V3 ,
2 D --1611,16118 M1113 V0'L1-01, PIMN119-1.01A, PW 0119W 2 - .240 6e
' A2 -07, M,1 MW NGILI40I-01, NGI4IW
aU.2106
180
180 Travelling CylinderA2imulh(TFO+AZI)['] vs Centre to Gene Separation (40 us88n1
Travelling Cylinder Azimuth (TFO•AZI) ['] vs Centre to Centre Separation [10 us8fin]
Project:
Lisburne
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America - ALASKA - BP
HATFIR
Calculation Method: Minimum Curvature
{-,
bSite:
L2
HES
t'
Well:
1-2.07
Interpolation Method: MD, interval: 25.00
Error System: ISCWSA
rr�
oa�v
Depth Range From: 10904.16 To 13962.20
Scan Method: Tray Cylinder
North
Wellbore:
PLAN L2.07B
Results Limited By: Centre Distance: 1593.73
Error Surface: Elliptical Conic
Plan:
L2.07B WP03
Reference: Plan: 1-2-07B WP03 (1-2-071PLAN L2 -07B)
Warning Method: Rules Based
G�wo9
u..1: 11.0
DepthRange:
P 9
10904.16
From Colour To MD
To 13962.20
w+ a v xwMme
0.90 0.99 9ru ,,.9r9
Brtl 9
.�
Lloll
7P194410K
lW2e19949W
L949IW.
10904 ""
11100
sec MD Inc An
Tv0
.W.E
.Er -W
deg
TFace vsect
Possible Magnetic Interference:
1
10904.18 21.61 30098
838204
470894
4209.60
0.00
0.00 -3327.95
From KOP to 11,100' MD
3
11100
11300
2
10924.00 2950 297.89
8380.38
471287
4216.23
11.22
-33.38 -3333.83
11800
3
4
10944.00 25.14 299.68
109840033.31 306."
8398.58
&33.47
4716.64
472739
422345
423970
900
2200
25.00 -3340.25
25.00 -3354.38
5
11231.50 8600 32878
8556.51
4885.12
437401
2200
25.00 -3459.27
11800
12100
6
1151450 8800 0.48
8576.04
514926
4451.88
12.00
90.00 -3489.87
11084.50 W2034242
858034
U90V
.4473.85
1200
9000 -34MA3
4&11300
_7
80
13962
8
12352.19 WOO 64.92
W1413
587280
4220.69
12.00
89.50 -3136.80
32
9
12862.20 91.91 104.49
8808.39
590248
-M%.84
1200
8700 -281646
f01298220
90.49 7091
W02.36
5913.58
-3022.93
12.00
-92.00 4541.00
11
1324210 W40 104.51
W0012
5924.81
-3317.15
12.00
9000 -2257.50
12
13522.20 9034 70.91
8598.25
5935.84
-3071.37
12.00
-90.00 -1994.00
13
IM02.20 8873 10450
859809
5948.88
-2795.59
12.00
9100 -1]2049
14
13982.20 89.74 85.30
8598.83
5933.07
-2838.92
12.00
-GOOD -1596.59
S6RY£YPRWMM
oWT Ilo, oertll To 5,$'o,Tool
180.03 AP5703 Y: MND-SbgaE n2-0]1 'Am
M24.0e 10900.1. ]: MVA+IFRINnlul(,?07) MM.JMIK
10900.18 13902N UARBW IPIANuvs) MWD
18-118PB3 34 0
1Q-11BPB2 1
L rn o 30 I' u 12-07A 1 3 v
LEGEND '22 -11 L2- A¢� 140
35 0
90 a 16n, Ian BPe2. IbnePe2 v0 ' @N, @N, @07-
a 1611, IaIIBPB], 1611BP0] VO w L141, L"I, L1-01 V3 ,
2 D --1611,16118 M1113 V0'L1-01, PIMN119-1.01A, PW 0119W 2 - .240 6e
' A2 -07, M,1 MW NGILI40I-01, NGI4IW
aU.2106
180
180 Travelling CylinderA2imulh(TFO+AZI)['] vs Centre to Gene Separation (40 us88n1
Travelling Cylinder Azimuth (TFO•AZI) ['] vs Centre to Centre Separation [10 us8fin]
Pmjw: Llebums V
WELLBORE DETAILS: PLAN L2 -07B eEFEBENaNFow.wrlu, ER
by SNs: L2 �P F. U -07B oaereie lw,a kre we, uuti xm `p�eyy`
Y WWI: L2-07 f\J�✓[. vemmfM1'ol Rmam®: M®�5®,evel nUC44ES
WWlbore: PUN L2 -07B 2-07aGEcomgamy__Plm: L2.=WP03PIusWM1MD Tem MD: 10804.18L Lyy yp.sgAn. µ�im�m Cunsue
Easeng (100 usWin)
Mean Sea Level
by
North America - ALASKA - BP
Lisburne
L2
L2-07
PLAN 1-2-0713
L2-0713 WP03 Plus 500ft MD
AOGCC Offset Well Report
22 October, 2018
Company:
North America - ALASKA - BP
Project:
Lisburne
Reference Site:
L2
Site Error:
0.0ousit
Reference Well:
L2-07
Well Error:
0.00usft
Reference Wellbore
PLAN L2 -07B
Reference Design:
L2-078 WP03 Plus 50011 MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well L2-07
Mean Sea Level
K8 Q 39.30usft (ORIG KELLY BUSHING)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCPi
Offset Datum
Reference
1-2-0713 WP03 Plus 500ft MD
Filtertype:
NO GLOBAL FILTER: Using user defined selection 8 ftftering criteria
From
Interpolation Method:
MD Interval 25.00ustt Error Model:
ISCWSA
Depth Range:
10,904.16 to 14,462.20usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 10/22/2018
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
180.03
4,367.032: MWD - Standard (L2-07)
MWD
MWD - Standard
4,424.06
10,904.16 3: MAID + IFR [Alaska](L2-07)
MWD+IFR:AK
MWD + IFR [Alaska]
10,904.16
14,462.20 1-2-078 WP03 Plus 500ft MD (PLAN 12-07
MWD
MWD -Standard
Summary
Site Name
Offset Well - Wellbore - Design
18
18-11 - 18-11 B - 18-11 B
18-11 - 18-11 BP82 - 18-118PB2
18-11 - 18-11 BPB3 - 18-11 BPB3
1.2
1.2-07 - 12-07 - 12-07
1.2-07 - 1.2-07A - 1-2-07A
1.2-07 - L2-07APB1 - L2-07APB1
1-2-07 - PLAN L2-0713- L2-078 WP03
NGI
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
11,960.77 14,025.00 148.76
11, 984.12 14, 00 0.00 195.47
11, 994.06 14, 02 5.00 195.35
11, 204.16 11, 325.00 190.21
10,925.00 10,925.00 0.00
10,925.00 10,925.00 0.00
13,525.00 13,525.00 0.02
10/222018 3:49:25PM Page 2 oft COMPASS 5000.1 Build 81D
I WE:=
4-1/16"CNV
WH.LHfAD=
FMC
ACTUATOR=
BAKER C
KB. ELEV =
39.3'
BF. ELEV =
7
KOP=
1965'
Max Angle =
W612630'
12630'
Datum MO=
4893'
Datum TVD =
88o0'SS
1 9-5/8' CSC,. 4011. L-80. D= 8.835" 1
Minimum ID =2.372"@ 10954'
3.7" BKR KB LNR TOP PKR
L2 -07A I SAR VOTES: WELL ANGLE> -701 @ 11208
PRUDHOE BAY
CracF9�aida � r;.e
ISTI
MD
ITVDIDEVI
I INTERVAL
TYPEVLV
DATE
LATCH
PORT
DATE
7
4009
3498
44
KBG2LS
ON11'
M
0
04/21/18
2
7758
6094
45
KBG2LS
OM1'
M
0
0421/18
3
10401
7958
34
KEK
DMY
8JT
0
12104/99
17" X 4-1/2" BAKER S-3 PKR D = 3.958" 1
10683' x-14-112" PX PLOG (0421118)
10590' 7'X4-12'BKRZXPPKRw
4-12' TBG, 12.6k, L-80, .0152 bpf, D = 3.958' 10606' D = 4.4375'
10608 4-12" WLEG, D = 3.958'
10612' S• X 4-12" XO
7' CSG, 2611, L-80, D = 6.276' 10786'
O ELMD NOT LOGGED
PERFORATION SUNfAkRY
REF LOG: SLB CNL ON 05/31/04
ANGLE AT TOP PERF: 86° @ 11575'
rote: Refer to Production DB for historical perf data
SIZE
SPF
I INTERVAL
Opn/Sgz
DATE
2'
6
11575 - 11606
O
03/13/18
2"
6
11619 - 11660
O
03/13/18
2"
6
11855 - 12055
C
05131/04
2'
6
12100- 12170
C
05/31/04
2"
6
12195-12245
C
os/31/04
2"
6
12325 - 12405
C
05131/04
2"
6
12445 - 12495
C
05/31/04
2'
6
12585 - 12635
C
05/31/04
2"
6
12700-128M
C
05/31/04
4-1/2" LW 12.6#. L-80, .0152 bpf. D =
1 }3/16" LNR 6.211. L-60..0076 bnf. D = 2370" I
10864' x-13.7"
BKR LNR TOP WR. D = 2.372"
10881'
3.7"BKRDEPLOYWWFSLV,D=3
10980'
10991'
3-12" HES X NP, D = 2.812"
3-12" X 3-3/16" XO, D
MLLOUT VVPDOW 11035' - 11041'
JCFJMD ADPERF'SBSETCIBP
DATE
REV BY COKENTS
DATE
REV BY OOM ENTS
12111/98
ORIGINAL COMPLETION
03/19/18
JCFJMD ADPERF'SBSETCIBP
06/02104 JLMIKAK CTD SIDETRACK(L2-07A)
05/0&18
ZV/JMJ GLV OO(0421/18)
01/01/10
JJ/RPC GLV UPDATE (12119/09)
05/09118
LLG/JMJ SET PX PLUG (04121/18)
08/15/17
JUJr,D CORRECT® CBPM3TH TYPO
05109/18
JMJ !UPDATED SAFETY NOTES
10/17/17
JDMJMJ MLLED B RUSHED CEPS
11IO6117
CJWJM) GLV GO (10/31117)
XO. D = 2.372"
12931' CTM
PRUDHOE BAY UNIT
WELL' L2 -07A
R94AT ND: *M40530
AR ND: 50-029-22910-01
SEC 18, T71 N, R15E, 3511.01' FEL 8 4478.5T FrL
BP B7ploration (Alaska)
TREE = 4.1/16'OW
WBJ--FAD=
FMC
ACRIATOR=
BAKHEC
KB. B.EV =
39.3'
BF. EL87 =
PORT
KOP=
1965'
MwAngle =
96't$12630'
Damm AD=
4893'
Olhnn TVD =
88W SS
L2-0lB
Proposed
PRUDHOE BAY
9-58' CSG, 408, L-80. D = 8.835. 11 4426'
Proposed Top of IA Cement -
1 4-12' TBG, 12.6#, L-80, .0152 bpf, D = 3.958' I
R 9.2#, L-80 SR. D = 2992" I— 1087W
KB Packer Whipstock 10924'
13.7'BKRLNRTOPPKRD-2.372' I
1-12' HES X NP. D = 2.812'
D = 3.953'
MLLOUF VYNDOW 11035'- 11041'
2-78' LNIK 6.58, L-W..W58 bpf, D - 2.441' 12966'
SAP-. AOTES:
GAS LIFT MANDRELS
STI
ND
I ND
I DEV
I TYRE
I VLV
ILATCH
PORT
D47E
1
4088
3498
44
KBG2LS
DMY
IAT
2
7758
1
6094
45
KBG2L5
CM1'
BAT
3
10401
7958
34
KBG2LS
DMY
INR
10660' 1 17- X 4-1/2' BAKER S-3 PKK D= 3.958-
------I
4-1/2' HES X NP, D = 3.813'
14-12'HES XW. D=2.813' 1
131/4' 6.4# LA0 TCI I
10961'3-12'
X 3-3/16' XO, D= 2.786'
11784'WFf
EXT RANGE CBP (03/13/18)
11806'
3-3/16' X 2-78' XO, K); 2.372'
01101/10 JJ/RPC GLV IPDATE(12/19/09)
/
12931' CTM—FSK
MILLED
10/17/17 JDN#JM7 MLLED&PUSHED C13PS
GBPS (10/1617)
DATE REV BY CONVENTS
DATE REV BY CONNBJTS
1211188 ORIGINAL COMPLETION
03119/18 .KF/AV ADPBiFS & SET GIBP
0682104 JLMIKAK CTD SIDETRACK(L2-07A)
01101/10 JJ/RPC GLV IPDATE(12/19/09)
08115117 JUJM7 CORRECTED OBP DEPTH TYPO
10/17/17 JDN#JM7 MLLED&PUSHED C13PS
11/06/17 CJWJAND GLV 00 (10131/17)
PRIOHDE BAY WT
WELL L2 -07A
FBWT N7: 41040530
AR No: 50-029-22910-01
SM 18, T71 R R15E, 3511.01' FTL & 4478.5T FTL
BP Exploration (Alaska)
Well Bighole
CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17
Quick Test Sub to Otis
Top of 7" Otis
O.Oft
— —.................. -----------
—CDR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
7.1/16" Sk Fiange X 7" Otis Box
Top of Annular
s
Hydril 7 1/16"
Top of Annular Element
6.7 ft
Annular
Bottom Annular
CL Blind/Shears
CL 2-318" Pipe/Slips
10.1 ft
B1 B2 a3 e4 Choke Line
Kill Line
CL 2-3/8" x 3-1/2" VBRs 12.6 ft
CL 2-3/8" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft i
�— Swab Test Pump Hose
T1 O T2
CL of Flow Cross 17.4 H
�-- Master
CL of Master 18.8 ft
LDS 0
IA
OA
LDS 0
Ground Level
0
Remark:
AOGCC
PTD No. 218-139 Coordinate Check
24 October 2018
INPUT
Geographic, NAD27
PBU L2 -07B
Latitude: 70 18 14.25000
Longitude: 148 26 15.84200
OUTPUT
State Plane, NAD27
5004 -Alaska 4, U.S. Feet
1/1
NorthingN-. 5963211. 673
E esti n g/X: 692843.809
Convergence: 1 28 15.2 594 5
Scale Factor: 0.999942246
Corpscon v6.0.1, U.S. Army Corps of Engineers
TRANSMITTAL LETTER CHECKLIST
WELL NAME: lAlt L
PTD: Z
✓ Development _ Service _ Exploratory Stratigraphic Test _ Non -Conventional
FIELD: POOL: / f tJ1
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. _'API No. 50- _-
function
(If last two digits
Production should continue to be reported as a of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company—Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
er Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150
Well Name: PRUDHOE BAY UN PBU L2-07B Program DEV Well bore seg ❑
PTD#:2181390 Company BP EXPLORATCt9- A$KA� INC. _ Initial Class/Type
DEV./ PDEND GeoArea 890 _ -_ -- _ Unit 1165.E On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven, gas conforms to AS31,05.0300.1.A),(j.2.A-D) ........ . . . . . . . . . ....
NA
1
Permit fee attached _ _ _ _ _ ....... .... - . - .
NA
2
Lease number appropriate.. - _ _ ...
Yes
_ _ _ Surface location in ADL 028321, portion of wellbore passes thru ADL 028307, top prodintervaland TO in..... .
3
Unique well. name and number _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..
Yes
ADL 028302 _ _
4
Well located in a defined pool _ ...
Yes
_ PRUDHOE BAY, PRUDHOE OIL POOL - 64015,. governed by CO 341 F _ _ _ _ _ _ _ _
5
Well located proper distance from drilling unit. boundary .... . . . . . . . ............
Yes
CO 341 F, Rule 2:- There shall be no restrictions. as to well spacingexceptthat, no pay shall be
6
Well located proper distance from other wells _
Yes
_ _ _ opened in a well closer than 500 feet to. the boundary of the affected. area. Planned well conforms to
7
Sufficient acreage. available indrillingunit.. _ _
Yes
CO 341 F, Rule 2.-
8
If. deviated, is wellbore plat. included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - _ ....
Yes
9
Operator only affected party - - - - ---- - - - - - - - - - - - - - - _ _ .... _ _
Yes-
10
Operator has appropriate bond in force - - ............ . . . . . .
Yes
Appr Date
11
Permit can be issued without conservation order_ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ _ _ _ _ _ ... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - .
12
Permit can be issued without administrativeapproval_ _ ...... _ _ _ _
Yes
. . . . . . . .........
SFD 10/24/2018
13
Can permit be approved before 15-day wait- - - - - - - - - - - -------- _ _
Yes
- - - - - - - - .......... _ _ - - - - - - - _ _ ........ - - - - - - - - - - - - - - - - -
14
Well located within area and. strata authorized by. Injection Order # (put 10# in.comments) (For.
NA
.... _ _ _ _ _ ... _ _ _ _ . .............
15
All wells within 1/4 mile.areaof review identified (For service well only) _ ......
NA
_ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ .......... - - - - - - _ - - - - - - - - - - - - ............. - - - -
116
Pre-produced injector: duration of pre production less than 3 months. (For service well only) - -
NA.
118
Conductor stringprovided.. _ .. ..... ..... . . . . . . . . ... . . .
NA
... Coiled tubing drilling lvishak sidetrack in zone._ _ ........
Engineering 119
Surface casing. protects all.known USDWs _ _ . . . . . . ...........
NA
_ _ _ Coiled tubing drilling lvishak sidetrack in zone._
1,20
CMT vol adequate to circulate-on conductor_& surf,csg _ _ _ __________ _ _ _ _ _ _ _ _ _ _
NA
_ _ _ Coiled tubing drilling lvishak sidetrack in zone._
121
CMT vol adequate. to tie-in long string to surf csg_ ..... _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _
NA
_ .. Coiled tubing drilling lvishak sidetrack in zone._ ...
22
CMT will Coverall known productive horizons- - _ - _ _ _ . . . . . . . ......
Yes
_ _ _ Production liner will be-fully cemented from TO intoparentwellbore
23
Casing designs adequate for C, T B & permafrost- - - _ _ _ _ ..... _ _ _ _
Yes
24
Adequate tankage.or reserve pit - ... --- - - - - - - - - - -- - - - - - -
Yes
CDR rig #2, has demonstrated adequate pit volumes
25
If a re-drill, has_a 10403 for abandonment been approved ... . . . . . . . . . . ........
Yes
_ _ _ _ Sundry 318-386 is fully approved. Includes plans for cmt packer squeeze
26
Adequate wellbore separation proposed _ _ _ _ _ _ .... - - - - - - _
Yes
_ Close- approach.to 18-116 approved because drilling lhru tubing
27
If,diverter required, does it meet regulations- - - _ _ _ _ _ _ _ ..
NA
Appr Date
28
Drilling fluid program schematic & equip list adequate- - - _ .. _ _ _ _ _
Yes
MGR 10/29/2018
29
BOPEs,.do they meet regulation _ ... _ _ _ _ _ _ _
Yes
_ _ _ Fully compliant.
30
BOPE_press rating appropriate; test to(putpsig in comments)_ _ _ _ _ _ ...
Yes
31
Choke. manifold complies w/API. RP-53 (May 84). . . . . . . . ......... _ _
Yes
_ _ _ ......... - - - - - - - - - - - - - - - - - - - -
32
Work will occur without operation shutdown. ....... . . . . . . . . _
Yes -
- ........ - - - . - - . - ....... _ .. _ _ _ _ _ .......
33
Is presence. of H2$ gas probable _ - - - . _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ _ . Yes, standard BP 112S_ hazards operalions.in place_ _
34
Mechanical condition of wells within AOR verified (For service well only) .. _ _ _ _ _
NA
LZ-07B-wilt bia an lvishak producer-
35
Permit can be issued w/o hydrogen sulfide measures_ _ _ _ _ _ _ _ _ _ _ _ _ _____ _ _ _
No.
.... L2-Pad wells are H2S-bearing._ H2S measures are required....
Geology
36
Data.presented on potential overpressure zones. _ _ _ .....
Yes
_ _ _ _ - Horizontal- redrill development well; will. kick off infvishak Zone. 1. and remain within that zone,
Appr Date
X37
Seismic analysis of shallow gas zones ____________ _ _ _ _ _ _
NA
_ _ Expected reservoir pressure is 7,6-ppg EAAW; will be drilled using 8.4 - 0.6.ppg mud & coiled tubing.
SFD 10/24/2018
38
Seabed condition survey (if off-shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _____ _ _ _ _ _ _ _ _ _ _ _____
NA
_ _ Should higher -pore _pressures be encountered, BP has immediate access to nearby fluid.mixing facilities..
39
Contact name/phone for weekly progress reports [exploratory only) . _ _
NA
Geologic Engineering
Date: Date Date
Commissioner: Commission omm' sio er
If1S
10( 3c,