HomeMy WebLinkAbout218-153MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, March 31, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
03-12A
PRUDHOE BAY UNIT 03-12A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 03/31/2023
03-12A
50-029-20392-01-00
218-153-0
W
SPT
8490
2181530 2122
1817 1808 1795 1814
6 7 6 6
4YRTST P
Austin McLeod
2/12/2023
Bump up from previous test. MITIA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT 03-12A
Inspection Date:
Tubing
OA
Packer Depth
2326 2627 2534 2503IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM230212193104
BBL Pumped:0.3 BBL Returned:3
Friday, March 31, 2023 Page 1 of 1
9
9
9
9
9
9
9
9
9
9 9 9 9
5HIHUWR,QVS5SWPLW6$0
9
9
Bump up from previous test.
James B. Regg Digitally signed by James B. Regg
Date: 2023.03.31 13:46:11 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, March 31, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
03-12A
PRUDHOE BAY UNIT 03-12A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 03/31/2023
03-12A
50-029-20392-01-00
218-153-0
W
SPT
8490
2181530 2122
1785 1806 1817
6 5 6
4YRTST F
Austin McLeod
2/12/2023
MITIA. Test bumped up. Separate report.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT 03-12A
Inspection Date:
Tubing
OA
Packer Depth
412 2505 2326IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM230212192545
BBL Pumped:2.7 BBL Returned:
Friday, March 31, 2023 Page 1 of 1
Refer to Insp Rpt# mitSAM230212193104
WELL LOG TRANSMITTAL #905493493
To: Alaska Oil and Gas Conservation Comm.
Atm.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Cement Bond Log: 03-12A
Run Date: 2/18/2019
2181 53
30 87 9
May 21, 2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
03-12A
Data in LAS format, Digital Log Image files
50-029-20392-01
RECEIVED
JUN 0 3 2019
AOGCC
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com and GANCPDC@USAANC.hou.
Date: roL�` 011 I Signed:
DATA SUBMITTAL COMPLIANCE REPORT
5/24/2019
Permit to Drill
2181530 Well Name/No. PRUDHOE BAY UNIT 03-12A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20392.01-00
MD
10745
TVD 8708 Completion Date
2/22/2019 Completion Status WAGIN
Current Status WAGIN UIC Yes
REQUIRED INFORMATION
/
Mud Log No I/
Samples No
Directional Survey Yes V
DATA
INFORMATION
List of Logs Obtained: MWD/GR/RES, Cement Evaluation
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OH I
Type
Med/Frmt Number Name
Scale Media No Start Stop CH
Received
Comments
ED
C-36459
Digital Data
8441 10745
3/14/2019
Electronic Data Set, Filename: 03-
12A_LW D_ FINAL_ FIELD_COMPOSITE_01 FEB2
019_BHI_CTK.Ias
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A_GR_Res _ O1FEB2019_MD_FINAL_FIELD_B
HI_CTK.cgm
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A_GR_Res _ 01FEB2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A_GR_Res-01FEB2019_MD_FINAL_FIELD_B
HI_CTK.pdf
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A_GR_Res _ 01FEB2019_TVDSS_FlNAL_FIEL
D_BHI_CTK.pdf
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A Final Survey Report.pdf
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A Final Survey.txt
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A_Final_Surveys.csv
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A_Final_Sumeys.Asx
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A_25_tapescan_B H I_CTK.t)d
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A_5_ tapescan_BHI_CTK.txt
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-12A_output.tap
ED
C
30459 Digital Data
3/14/2019
Electronic File: 03-
12A GR Res_ 01FEB2019_MD_FINAL_FIELD_B
HI CTK.Sf
AOGC('
Page 1 of 3
Friday, May 24, 2019
DATA SUBMITTAL COMPLIANCE REPORT
5/24/2019
Permit to Drill
2181530 Well NamelNo. PRUDHOE BAY UNIT 03-12A
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20392-01-00
MD
10745
TVD 8708 Completion Date 2/22/2019
Completion Status WAGIN Current Status WAGIN UIC Yes
ED
C
30459. Digital Data
3/14/2019
Electronic File: 03-
12A_GR_Res _ OIFEB2019_TVDSS_FINAL_FIEL
D_BHI_CTK.tif
Log
C
30459 Log Header Scans
0 0
2181530 PRUDHOE BAY UNIT 03-12A LOG
HEADERS
ED
C
30514 Digital Data
8441 10745 3/28/2019
Electronic Data Set, Filename: 03-
12A_LWD_FINAL _FIELD_COMPOSITE_01FEB2
019_BHI_CTK.Ias
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A_GR_Res_01FEB2019_MD_FINAL_FIELD_B
HI_CTK.cgm
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A GR—Res _ 01 FEB2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A_GR_Res_01FEB2019_MD_FINAL_FIELD_B
HI_CTK.pdf
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A_GR_Res_01FEB2019_TVDSS_FINAL_FIEL
D_BHI_CTK.pdf
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A Final Survey Report.pdf
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A Final Survey.txt
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A_Final_Surveys.csv
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A_Final_Surveys.xlsx
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A_25_tapescan_B H I_CTK.txt
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A_5_tapescan_BHI_CTK.td
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-12A_output.tap
ED
C
30514 Digital Data
3/28/2019
Electronic File: 03-
12A_ GR_Res_01FEB2019_MD_FINAL_FIELD_B
HI_CTK.tif
ED
C
30514 Digital Data
328/2019
Electronic File: 03-
12AGR_Res _ 01FEB2019_TVDSS_FINAL_FIEL
D_BH_I_CTK.tif
Log
C
30514 Log Header Scans
0 0
2181530 PRUDHOE BAY UNIT 03-12A LOG
HEADERS
AOGCC Page 2 of 3 Friday, May 24, 2019
DATA SUBMITTAL COMPLIANCE REPORT
512412019
Permit to Drill 2181530 Well Name/No. PRUDHOE BAY UNIT 03-12A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20392-01-00
MD 10745 TVD 8708 Completion Date 2/22/2019 Completion Status WAGIN Current Status WAGIN UIC Yes
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
INFORMATION RECEIVED
Completion Report (Y
Production Test Information Y /®
Geologic Markers/Tops oY
COMPLIANCE HISTORY
Completion Date: 2/22/2019
Release Date: 11/29/2018
Description
Comments:
Compliance Reviewed By:
Directional / Inclination Data 0
Mechanical Integrity Test Information Y / NA
Daily Operations Summary T
Date Comments
Mud Logs, Image Files, Digital Data Y /(A Core Chips Y
Composite Logs, Image, Data Files (J Core Photographs Y
Cuttings Samples Y /p A Laboratory Analyses Y NA
Date:
AOGO<' Page 3 of 3 Friday, May 24, 2019
BA UER �`� PRINT DISTRIBUTION LIST
i-�UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME
03-12A
FIELD Prudhoe Bay Unit
2181Fl. 3
30514
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com
to acknowledge receipt of this data.
COUNTY PRUDHOE BAY LOG TYPE
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick Rlder(O7bI1ge.COm
STATUS Rev
COMPANY
- RES
LOG DATE February 1, 2019
TODAYS DATE March 27, 2019
Revision Final Survey Report was Revised
Replacement: CD Details:
Rev. Requested by: ---
ADDRESS
-
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
I BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501 _
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska -AOGCC
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
FIELD
FINAL
CD/DVD
FINAL
PRELIM(las,
dlis, PDF, META,
SURVEY
I
REPORT
LOGS
LOGS
11
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
b OF COPIES
# OF COPIES
4 4 ll 1; J; JJ
0 0 1 1 0
0 0 1 0 10
5 DNR - Division of Oil & Gas ***
Attn: Resource Evaluation �qE qE'v E D
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501 MAR q e
** Stamp "confidential" on all material deliver to DNR MAR I 201 A'B
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Merion Kendall
TOTALS FOR THIS PAGE: 0 0 5 2 0
Winston, Hugh E (DOA)
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Thursday, March 21, 2019 4:19 PM
To: Winston, Hugh E (DOA)
Subject: RE: PBU 03-12A, PTD#218-153, Well class and status
Correct. Service, not Development
Thanks again!
Thank you,
Joe Lastufka
SIM Specialist
Cell: (907) 227-8496 1 Office: (907) 564-4091
Subsurface & Wells
+nf4rY:lA:IAtf M,.9CgS7yYhtltlC
BP Exploration Alaska 1900 E. Benson Blvd. I Room: 717B I Anchorage, AK
From: Winston, Hugh E (DOA) <hugh.winston@alaska.gov>
Sent: Thursday, March 21, 2019 4:17 PM
To: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Subject: RE: PBU 03-12A, PTD#218-153, Well class and status
This is good training for me so it's all good Q No need for a new copy, I'll edit the form directly.
Also, is the class still Service and not development?
Huey
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Thursday, March 21, 2019 4:12 PM
To: Winston, Hugh E (DOA) <hueh.winston@alaska.eov>
Subject: RE: PBU 03-12A, PTD#218-153, Well class and status
You are bad luck for me Huey!
It is an Injector (WAG).
Sorry about that, would you like a new copy tomorrow?
Thank you,
Joe Lastufka
SIM Specialist
Cell: (907) 227-8496 1 Office: (907) 564-4091
* Subsurface&Wells
"- IntomwiLt Mwagoment
BP Exploration Alaska 1900 E. Benson Blvd. Room: 717B Anchorage, AK
From: Winston, Hugh E (DOA) <hugh winston@alaska.gov>
Sent: Thursday, March 21, 2019 4:08 PM
To: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Subject: PBU 03-12A, PTD#218-153, Well class and status
Hi Joe,
I am inputting data from a 10-407 and the status and class that are listed are different than the status and class from the
permit to drill. It is listed as Oil development and I am not seeing any production information in our database. Could you
check this information please?
API#50029203920100
PTD#218-153
Well: PBU 03-12A
Huey
STATE OF ALASKA
'ASKA OIL AND GAS CONSERVATION COMMIS.,` I
WELL i jMPLETION OR RECOMPLETION REPO. AND LOG
L�; iib i IV
la. Well Status: Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
ib. Well Class
1 20AAC 25.105 20MC 25110
GINJ ❑ WINJ ❑ WAG W' 'WDSPL ❑ No. of Completions: One
a I Exploratory ❑
Service S tigraphic Test ❑
2. Operator Name.
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
2/222019
218-153
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
1/27/2019
50-029-20392-01-00
4a. Location of Well (Governmental Section):
8, Date TO Reached*NEW
131
i6. Well Name and Number:
?011PBU
03.12A
9 Ref Elevations KB 64
17. Field/Pool(s):
Surface: 985' FSL, a87' FWL, Sec. 11, TION, R15E, UM
Top Of Productive Interval: 1018' FSL, 3131' FWL, Sec. 11, TION, RISE, UM
GL 24.62 BF 26.90
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation.
Total Depth: 1388' FSL, 3449' FV&, Sec. 11, TION, R15E, UM
. 10730' / 8715'
ADL 028327
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 714158 y- 5937030 Zone - ASP 4
. 10745'/ 8708'
74-017
TPI: x- 716400 y- 5937147 Zone - ASP 4
12, SSSV Depth (MD/TVD):
20 Thickness of Permafrost MD/TVD
Total Depth: x- 716707 y- 5937527 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes EI (attached) No ❑
13. Water Depth, if Offshore:
21. Re-dnl/Laterel Top Window
MD/rVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
, 9176'/ 8759'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD / GR / RES, Cement Evaluation
23. CASING, LINER AND CEMENTING RECORD
CASING
Wr, PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
I
AMOUNT
PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
94#
H -4a
38'
118'
38'
118'
30"
550 sx Arctic Set
13-3/8"
72#
L-80
37'
2762' •
37'
2735'
17-112"
3000 sx Fondu, 400 sx AS II
9-55/81,
47#
L -M&95
35'
9176'
35'
8759'
12-12"
600 sx Class'G', 300 sx AS I, 75 sx AS I, 581 sx Class'G'
7-5/8"
29.7#
L-80
3253'
9176'.
3193'
8759'
Scab Liner
316 ax Class'G', 442 sx Class'G'
3-1/2"x3-1/4"
9.3#/6.6# 1
1acr85
8730'
10746-
8329'
8708'
4-1/4"
141 sx Class'G'
x2 -718"x2-3/8"
/8.5#/4.7#
lWre5rL-80
24. Open to production or injection? Yes m No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
GRADE DEPTH SET (MD) PACKER SET (MDFFV
5-12" 17n x 4-12^ 12 W L-80 8790' 8643'- 8245'
2" Gun Diameter, 8 sof 2/19/2019 - 2/222019
4-112" 126# L-80 8878'- 9003' 8896'/ 8490'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10050'-10082' 9035'-9020'
10555'- 10580' 8798' - 8785'
10580'- 10610' 8785'- 8771' TION COMPLE
10610' - 10670' 8771' - 8743' )E �
Was hydraulic fracturing used during completion?
Per 20 AAC 25.283 (i)(2) attach electronic and printed Yes ❑ No
10670'- 10700' 8743'- 8729' 2 Z 0/1
/5
information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
VERIFIE
10050'- 10700' 40 BOIs 9.2% HCL, 37 Bbis 11.9% HF Adds
27, PRODUCTION TEST
Dale First Injection: February 24, /2019
Method of Operation (Flowing, gas IBL etc.): Water Injection
Dale of Test:
Hours Testetl:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Sive'
Gas -Oil Ratio'
Test Period y
Flow Tubing
press
Casino Press:
Calclated
24 Hour Rate --►
Oil -Bbl:
Gas -MCF:
Wafer -Bbl:
Oil Gravity- API (oorr):
Form 10-407 Reviwd 52017 50niNUED ON PAGE 2 Submit ORIGINAL only
A P 0y MC9(7211WP-17 RBDMSP—rwMAR 2 12019 , c�) / s �
28. CORE DATA I Conventional Cones) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing lest results. Attach
Top of Productive Interval
9117'
8703'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Sadlerochit - Zone 4B
9117'
8703'
Kicked off from Parent (03-12)
9176'
8759'
42SB-Zone 4A
9223'
8805'
CGL - Zone 3
9292'
8871'
Base of CGL - Zone 2C
9346'
8919'
23SB - Zone 28
9469'
8987'
22TS
9560'
9016'
21 TS - Zone 2A
9712'
9071'
22TS (Invert)
9934'
9081'
Zone 2B
10078'
9022'
Zone 2C
10143'
8992'
Zone 3
10274'
8929'
Zone 4A
10360'
8888'
Zone 4B
10536'
8805'
Formation at total depth:
Zone 4B (From Base)
10536'
8805'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Hartley, Josephine
Authorized Title: pectalist Contact Email: Josephine.HartleyCbp.com
Authorized Signatu Date: N2.0/I1 Contact Phone: +1 9075644570
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (fop of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this forth: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production orwell test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
WELLHEAD=
FMC
ACTUATOR=
NDte: Refer to PToduct(on OB for historical perf data
KB. ELEV =
64'
BF. R =
26.9'
KOP=
2200'
Max Angle =
119' @ 10271'
Datum MD=
9284'
03kimTVD=
8800 SS
20' COND, 110'
9211, H-40,
D = 19.124'
L-80 VAM TOP, D = 8.681' 1-1 1640'
7-5/8" SCAB LNR
Minimum ID =1.93" @ 10713'
2-7/8" X 2-3/8" XO
OF 3-12' X 3-1/4" X 2-7/8' X 2-3/8' LNR/CMT87
AR 9.38, 13CR-85 STL, .0087 bpf, D = 2.992' 87
4-1/2" TBG, 12.6#, L-80 VAM TOR'TCII, 871
.0152 bpf, D = 3.958"
4-12' TBGIPC, 12.68, L-80 BTCAB-MOD, I 9003'
.0152 bof. ID = 3.958'
4-12' X 7-5/8' BKR DELTA WHIPSTOCK 9169'
w/RA TAGS (12/18/18)
295D75'.8L-80 FL4S, ^9169'
PERFORATION SUMMARY
REL LOG HB; GR CL ON 02/19/19
ANGLEATTOPPERF: 117° @ 10050'
NDte: Refer to PToduct(on OB for historical perf data
SIZE
SPF
INTERVAL
gNVSgz
SHOT
SOZ
2
6
10050 - 10082
O
0222/19
9113'
2
6
10555 - 10580
O
02/22/19
2
6
10580-10610
O
02/22/19
2
6
10610 - 10670
O
0220/19
2
6
10670 - 10700
O
02/19/19
SAFETYNOTES: —NOTE PWI ONLYINO MI INJECTION
ALLOW —WELLANGLE>70-@96IW_
03-12A MAXDL, .3.8. 91) 9518'..—CHROME LNR-
7Lr14- -11W 11W IF UK 5LV, U="f
7304' 9-5/8' X 7-5/8" TIW SN -6-H PKRw/ HYD HGR
8612'-�4-12-HESXNP,1D=3.813' I
7-5/8" X 4-12" HES TNT PKR. D = 3.856'
8720' 4-12" HES X NP, D = 3.813' I
8730' 45KB LTPw/PfSA&2-7/8-X NP, D=2.31
874W 3.70' DEPLOY SLV, D=3.00"
878T 3-12' X 3-3/16' XO, D = 2.786'
8788' 4-12"WLM, D=3.958' BEHIND
7 8878--1 4-12' BAKHR PBR ASSY, D=3.875' CT LNR
8900' x--15-12'
BKR MLLOUT BCFENSDN, D = 4.778'
8906'
5-12" X 4-12' XO, D = 3.90'
8998'
4-12' OTIS X NP, D = 3.813'
jFWVN2
FWW
4-12" WLEG, D=4.00'
9�
8873'
6_MD TT LOGGED 06/12/89
9093' 9-5/8'MARKER JOM BEHIND
CTD ST (03-12A)
CT LNR
9113'
H 9-5/8" MARKER J084r
MLLOUT WINDOW (03-12A) 9176'-9184'
X 2-7/8" XO. D = 2.377'
31/4' LNR, 6.6#, 13CR45 TCB, 9199'
.0079 bpf, D = 2.85'
2-7/8' LNR 6.58, 13CR-85 STL, .0058 bpf, D
L-80 HYD511, .0036 bpf, D = 1.920" I-1 10746' J '
DOTE I REV BY
111=79
I COAMtNfS
ORIGMAL COMPLETION
DATE I REV BY I COMMENTS
03/04/19 BGIJMD AOPERI
1UZBf86
T8N07/19
JWJMD FMLOOEAPPROVAL
jFWVN2
FWW
_
0320/19 GJB/ SET LTPw/PISA&X NP(02/09119)
IaAlO
02101/19
CTD ST (03-12A)
02/12/19 JMD
OFiLG HO OORRECTKM
3" X 2-3/8' XO,
D = 1.93'
PR DHOE BAY U TT
WELL: 03-12A
PERMIT Nx 218-153
AR Hb: 504Y29-20392-01
SEC 1l jl0r-, R15E, 965' FSL & 887' FWL
BP Exploration (Alaska)
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 03-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 1/24/2019 End Date. 2/1/2019 X3 -0198W -C: (1,820,528.00)
Project: PBU Site: 03
Rig Name/No.: CDR -2 Spud Daterrime: 10/17/1979 12:00:00AM Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001385
Active datum: KB @64.00usft (above Mean Sea Level)
Page 1 of 12 1
Date
From - To
Him
Task
Code
NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
1/24/2019
11:30
- 15:30
4.00
MOB
P
PRE
LTT COMPLETED, FINISH RD CHECKLIST FOR
___
_
_ _
MOVE TO DS 3_ _
15:30
- 17:00
1.50
MOB
P
PRE
RIG READY TO PULL OFF WELL
- HOLD PJSM TO MOVE RIG OFF WELL WITH
CREW AND NES DRIVERS
- VERIFIED ALL VALVES ARE CLOSED
- O PSI ON IA & OA
- CONFIRM ALL PERSONNEL GIVING
DIRECTIONS UNDERSTAND THE COMMAND
TO STOP SIGNAL
-12X12 IN PLACE TO KEEP RIG FROM
'MOVING BACK TOWARDS THE WELL
.- CALLED PAD OF TO WITNESS MOVE OFF
THE WELL BUT WAS BUSY
- MOVE PIT SUB OVER A FEW FEET THEN
MOVE MAIN SUB OFF WELL
17100
- 18:00
1.00
MOB
P
,
PRE
MAIN SUB OFF THE WELL, STAGE TO INSTALL
_
_
JEEPS AND PREP TO MOVE TO DS3
18:00
- 00:00
6.00
MOB
P
PRE
MOVE RIG
-HOLD PJSM WITH SECURITY, TOOL
SERVICE, AND RIG CREW FOR RIG MOVE
MOVE RIG FROM P PAD TO CENTRAL
CHECKPOINT GUARD STATION.
1/25/2019
00:00
- 03:30
3.50
MOB
P
9,168.00
PRE
MOVE RIG FROM CENTRAL GUARD SHACK
CHECK POINT TO DS 03
03:30
- 07:00
3.50
MOB
P
9,168.00
PRE
MOVE OVER WELL..
ARRIVE ON PAD
VERIFY PRESSURE ON IA / OA. SHUTALL
VALVES.
LAY DOWN HERCULITE AND 12 X 12 CHOCK
BLOCK.
PJSM FOR PULLING OVER WELL
PULL SUB OVER WELL.
07:00
- 08:30
1.50
RIGU
P
9,168.00
PRE
MAIN SUB SPOTTED
SPOT PIT SUB
08:30
- 10:00
1.50
RIGU
P
9,168.00
PRE
PIT SUB SPOTTED, ACCEPT RIG AND START
RU CHECKLIST
10:00
- 12:00
2.00
RIGU
P
9,168.00
PRE
- CYCLE TREE VALVES, 0 PSI ON WELL
- LTT MASTER & SWAB VALVES
- GOOD TEST, CONTINUE RU CHECK LIST
12:00
- 16:00
4.00
BOPSUR
P
9,168.00
PRE
PJSM TO MU THE MPD LINE, REMOVE TREE
_
CAP AND NU BOPE
16:00
- 21:30
5.50
BOPSUR
P
9,168.00
PRE
RIG UP
-INSTALL TURNBUCKLES ON BOPS
-GET RKBS
-MAKE UP NOZZLE
-FILL COIL WITH FRESHWATER
-PREP RIG FLOOR FOR BOP TEST
-PURGE AIR FROM SYSTEM.
-MU TEST JOINT ASSEMBLY
-LINE UP FOR SHELL TEST
-REVIEWED PRESSURE CROSS CHECK
VERIFICATION CHECKLIST
-SHELL TEST BOPS TO 250/3500 PSI FOR 5
MINUTES EACH -GOOD TEST
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 03-12
Event Type. RE-ENTER- ONSHORE(RON) Start Date: 1/24/2019 End Date: 2/1/2019
Project: PBU Site: 03
Rig Name/No.: CDR -2 Spud Date/Time: 10/17/1979 12:00:OOAM
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @64.00usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
(hr) (usft)
21:30 - 00:00 2.50 BOPSUR P 9,168.00 PRE
1/26/2019 00:00 - 05:30 5.50
05:30 - 06:00 0.50
0600 - 11:30
Page 2 of 12
AFE No
X3 -0198W -C'. (1,820,528.00 )
BPUOI: USA00001385
Description of Operations
TEST BOPS AS PER AOGCC AND BP
GUIDELINES TO 25013,500 PSI:
TEST 1: BLIND/SHEARS, R1, BL1A, 81, B4 -
PASS
TEST 2: ANNULAR (2-3/8"), TIW2, B3, 82, BL1 -
PASS
TEST3: UPPER 2-3/8" PIPE/ SLIPS, TIW1,
BL2, R2, T2, C75- FAIL/PASS-GREASEAND
CYCLE R2 AND RETEST GOOD.
TEST 4: C16, T1, C11 -PASS
NOTE: AOGCC INSPECTOR JEFF JONES
WAIVED WITNESS OF BOP TEST AT 1848
HRS.
BOPSUR P 9,168.00 PRE TEST BOPS AS PER AOGCC AND BP
GUIDELINES 70 250 / 3,500 PSI:
TEST 5: VBR (2-318"), C7, C9, C10, TV2 -PASS
TEST 6: LOWER -2-3/8" PIPE / SLIPS, C5, C6,
C8, TV1-PASS
'TEST 7: CHOKE A, CHOKE C - PASS
CONDUCT DRAWDOWN TEST, RECORD
CLOSING TIMES.
RECONFIGURE TEST JOINT FOR REMAINING
BOP TESTS.
TEST 8: ANNULAR (3-1/2"), Cl, C4
TEST 9: VBRS (3-1/2"), C2, C4 - PASS
TEST #10 IRV / RACKOFF / C9 & C10
BACKWARDS
SOPSUR
5.50 BOPSUR
NOTE: PRE SPUD MEETING HELD WITH
MICAH'S CREW -HAVE NOT HELD EVAC DRILL
DUE TO PHASE CONDITIONS, WILL HOLD
TABLE TOP PRIOR COMMENCING WELL
_OPERATIONS.
P1� 9,188.00 PRE BOP TEST COMPLETED
- HOLD A PJSM WITH GREASE CREW TO
CHECK
_TREE BOLTS AND CHECK BOLTS
P 9,168.00 PRE TREE BOLTS CHECKED, VALVE CREW
CHANGING
OUT
- HOLD A PJSM WITH NABORS AND VALVE
CREW
TO RU AND PULL THE T WC
- LOAD LUBRICATOR & TOOLS ON RIG
- MU PULLING TOOL, STAB ON AND TEST
- GOOD TEST, OPEN SWAB & MASTER
VALVESAND
PULLTWC
- VALVE PULLED 0 PSI ON WELL, CLOSE
MASTER &
SWAB VALVES AND IN FLOW TEST VALVES
- GOOD NO FLOW TEST, PU THE
LUBRICATOR, LD
TOOLS AND LOAD OUT
- BOTH SEALS STILL ON TWC
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths**
Common Well Name: 03-12
Event Type: RE-ENTER- ONSHORE (RON)
Proiect: PBU
North America - ALASKA - BP
Operation Summary Report
Start Date: 1/24/2019 Eno Date. 2/1/2019
Site: 03
AFE No
K3 -0198W -C:(1,820,528.00)
Page 3 of 12
Rig Name/NO.: QUR-2 Spud Date/rlrne: 10/17/1979 12:00:OOAM
Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001385
Active datum: KB ®64.00usft (above Mean Sea Level)
Date From - To Hire Task
Code NPT Total Depth
Phase Description of Operations
-_- - _ (hr)
(usft)__ _.
11:30 - 13:00 1.50 BOPSUR
P 9,168.00
PRE HOLD PJSM TO INSTALL BHI FLOATS THEN
TEST
THE QTS
-INSTALL FLOATS
- PT THE FLOATS
- GOOD PT, RD TEST HOSE, INSTALL NIGHT
CAP,
_
TESTAND PREP TO BHK THE WELL
13:00 - 15:00 2.00 KILLW
P 9,168.00 l
PRE HOLD A PJSM TO BULLHEAD KILL WELL
- VERIFY LINE UP, DISCUSS FLUIDS THAT
WILLBE
(PUMPED
i -ONLINE WITH 10 BBLS OF NEAT METH
- IAP = 0 PSI, OAP = 0 PSI
- RATE = 6.0 BPM AT 1288 PSI WHEN
iPRESSURE
STARTED SLOWLY DROPPING OFF
- SWAP TO 150 BBLS KCL
- SWAP TO 50 BBLS HI -VIS PILL
- SWAP TO 136 BBLS KCL
THIS WILL PLACE THE 50 BBL HI -VIS PILL
ACROSS
THE PERF
PUMPED 4 BBLS OF HI -VIS PILL OVER
DISPLACEMENT TO BOTTOM PERF, SHUT
DOWN
PUMP
WHIP =725 PSI AND IS SLOWLY BLEEDING
OFF
- HOLD A PJSM TO PT THE QTS ADN MU THE
MILLING BHA
15:00 - 16:00 1.00
KILLW P 9,168.00 PRE CRACK CHOKE OPEN TO BLEED OFF
16'.00 - 17'.00 1.00 STWHIP
RESIDUAL
194 PSI
- GOT BACK 3 BBLS, CLOSE CHOKE TO
MONITOR
AND CALL WSUPT EGBEJIMBA AS PER THE
WELL
MONITORING MATRIX AND WE ARE AT 0 PSI
WHP.
- AGREE TO OPEN UP AND TAKE UP TO 2
BBLS
MORE THEN CLOSE CHOKE TO MONITOR
- OPEN CHOKE, GOT BACK 0.5 BBLS THEN
WENT
TO ZERO FLOW
- FLOW CHECK WELL FOR 10 MINUTES
- GOOD 15 MIN FLOW CHECK, LINE UP TO
CIRC
ACROSS THE TOP AND SEE IF WE LOST ANY
FLUID
- NO LOSSES AFTER 15 MIN FLOW CHECK
P 9.168.00 WEXIT MU THE QTS, STAB ON, CLOSE THE SWAB
AND PT
- GOOD PT, BLEED OFF
- OPEN SWAB TO A CLOSED CHOKE, NO
PRESSURE
-OPEN CHOKE NO FLOW, FLOW CHECK
WELL
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 4 of 12
Common Well Name: 03-12 AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Dale'. 1/24/2019 End Date: 2/1/2019 X3 -0198W -C:(1,820, 528.00)
Protect: PBU Site: 03
Active datum: KB @64.00usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT
(hr)
17.00 - 1745 0.75 STWHIP P
17:45 - 22:00 4.25 STWHIP P
22:00 - 00:00 2.00
1/27/2019 0000 - 1030 10.50
STWHIP- -P
STWHIP P
1030 - 1430 4.00 STWHIP P
BPUOI: USA00001385
Total Depth
Phase Description of Operations
(uslt)
9,168.00
WEXIT GOOD NO FLOW, PU THE INJECTOR AND
DEPLOY
THE MILLING BHA
-TEST QTS TO 3500 PSI -GOOD TEST.
9,177.00
WEXIT 'RIH
- RATE: 0.05 BPM IN, 0.3 BPM OUT. CIRC
PRESSURE: 140 PSI
-TIE IN AT 8560'-8643'CORRECTION-30'
-RIH PUMPING AT MINIMUM RATE AND SWAP
TO
QUICK DRILL
-WT CHECK 45K UP, 28K DOWN AT 9100'
-RIH CAREFULLY, LIGHT TAG AT 9177' AT 0.5
BPM.
'-PICK UP OFF BOTTOM AND INCREASE PUMP
RATE
-INCREASE RATE TO 2.5 BPM IN 2.0 OUT AT
1350
PSI.
9,179.00 WEXIT MILL 3.80° WINDOW IN 7-5/8" SCAB LINER PER
BAKER REP FROM 9177' MD TO 9179' MD
RATE:.2.9 BPM IN, 2.65 BPM OUT
- MUD WEIGHT: 8.6 PPG IN, 8.53 PPG OUT
- DWOB:.5-1.4 KLBS
- CIRC PRESSURE: FREE SPIN 2236 PSI/
MILLING
2448-2520 PSI
NOTE: HOLD TABLE TOP EVACUATION DUE
TO H2S
DRILL WITH MICAH'S CREW. GOOD
DISCUSSION
_____ _ ANDAAR.
9,183.00 WEXIT MILL 3.80" WINDOW IN 7-5/8" SCAB LINER PER
BAKER REP FROM 9179' MD TO 91 83'MD
- RATE: 2.58 BPM IN, 2.51 BPM OUT
-MUD WEIGHT: 8.6 PPG IN, 8.53 PPG OUT
- DWOB: 3-3.5 KLBS
-CIRC PRESSURE: 2350-2400 PSI
9,183.70 WEXIT MILL EXITED THE BOTTOM OF THE WINDOW
AT 9183.7' (6.9' WINDOW)
THE
TIME MILLING FOR PTO DRESS
THE BOTTOM OF THE WINDOW WITH THE
STRING MILL
- MILL 10' OF RAT HOLE TO 9194'
14:30 - 16:00 1.50 STWHIP P 9,194.00 WEXIT RAT HOLE DRILLED, START BACK REAMING
PASSES
- i AT AS MILLED, 1 EACH AT 15' L&R OF 150°
- PASSAT 165` CLEAN SEEING A LITTLE
WORKAT THE BOTTOM ATAS MILLED
- PASS AT 135° IS CLEAN START HI -VIS PILL
- MAKE 1 DOWN AND UP PASS WHILE
PUMPING HI -VIS PILL OUT
Printed 3/11/2019 12:51:26PM "All depths reported in Drillers Depths"
Common Well Name. 03-12
Event Type: RE-ENTER- ONSHORE(RON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 1/24/2019
Page 5 of 12
AFE No
End Date. 2/1/2019 X3 -0198W -C. (1,820.528.00)
Project: PBU Site. 03
Rig Name/No.: CDR -2 Spud Date/Tirw 10/17/1979 12:00 OOAM Rig Release: 2/4/2019
Active datum: KB @64.00usft (above Mean Sea Level)
Date From - To Him Task Code NPT
(hr)
16:00 - 17:20 1.33 STWHIP P
BPUOI: USA00001385
Total Depth
Phase Description of Operations
(usft)
9,194.00
WEXIT WINDOW IS CLEAN, FLOW CHECK WELL TO
POOH
- WELL IS CHARGED UP A LITTLE, SAME AS IT
WAS YESTERDAY FROM THE BULLHEAD KILL
(TRAPPED PRESSURE)
- WELL DOWN TO A TRICKLE BUT WE ARE AT
3 BBLS RETURNED, CLOSE IN CHOKE TO
MONITOR FOR PRESSURE AND CALL WSUPT
EGBEJIMBAAS PER THE WMM
_
- IF NO PRESSURE BUILDS, AGREE TO OPEN
1720
UP TO SEE IF THE WELL IS FLOWING, AGREE
2.67
TO ONLY TAKE 1 BBL BACK THEN SHUT IN
P
AND CALL
WEXIT
- 0 PSI ON WH, OPEN CHOKE
- DOWN TO A TRICKLE THEN STOPPED AT 0.1
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths"
BBL FLOW BACK
- NO FLOW FROM WELL, START 10 MIN FLOW
_
_
CHECK
1720
- 2000
2.67
STWHIP
P
9,194.00
WEXIT
GOOD FLOW CHECK, POOH
- �i
-PUMP 3.5 BPM IN, 3.21 BPM OUT
20:00
- 22:15
2.25
STWHIP
P
9,194.00
WEXIT
70 MIN FLOWCHECK IS GOOD.
PJSM FOR UD BHA.
OPEN RISER AND INSPECT LAST 50' OF CT,
NO FLAT SPOTS SEEN.
VD BHA#1,
MILL IS 3.80" GO, 3.79" NO-GO.
STRING REAMER IS 3.79" GO, 3.78" NO-GO
MU BHA# INTO WELL, MAKE UP UQC AND
INJECTOR.
PRESSURE TEST QTS TO 3500 PSI, GOOD
NOTE: INJECTOR OFF AT 2010 HOURS/
INJECTOR ON AT 2145 HRS
22:15
- 00:00
1.75
DRILL
P
9,194.00
PROD?
RIH BHA#2
1/28/2019 0000
- 0030
0.50
DRILL
P
4
9,194.00
PROD?
RIH BHA#2
TIE-IN DEPTH FROM 8510' CORRECT -30'.
JUST ABOVE WINDOW, SHUTDOWN PUMP
AND CLOSE EDC.
00:30
- 03:45
3.25
DRILL
P
9,305.00
PROD?
DRILL 4.25" BUILD SECTION FROM 9194' MD
TO 9305' MD
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.85 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 2850-2950 PSI
- MUD WEIGHT: 8.59 PPG IN, 8.56 PPG OUT,
ECD: 9.43 PPG
- ROP: 25 -35 FT/HR, WOB: 1.5-3.5 KL_B_S _
0345
- 0415
0.50
DRILL
P
9,305.00
PROD?
WIPER TRIP FROM 9305'TO 9210'
NOTE:EXAMINE FIRST GOOD SURVEY TO
EXTRAPROLATE TO THE PLAN. DISCUSS
WITH ODE ABOUT EXTENDING BUILD 100' _
04:15
- 06:00
1.75
DRILL
P
9,412.00
PROD1
DRILL 4.25" BUILD SECTION FROM 9305' MD
TO 9425' MD
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.85 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 2850 - 2950 PSI
- MUD WEIGHT: 8.59 PPG IN, 8.56 PPG OUT,
ECD: 9.43 PPG
- FOR 25 -35 FT/HR, WOB: 1.5-3.5 KLBS
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths"
Common Well Name: 03-12
Event Type: RE-ENTER- ONSHORE (RON)
PBU
North America - ALASKA - BP Page 6 of 12
Operation Summary Report
Start Date'. 1/24/2019
Site: 03
Eno Date. 2/1/2019
AF'E No
K3 -0190W -C. (1,520,528.00 )
Rig Name/No.: GUR-2
Spud OateRime: 10/17/1979 12:00:OOAM
Rig Release: 2/4/2019
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI. USA00001385
Active datum: KB @64.00usft (above
Mean Sea Level)
Date From - To
Him
Task
Code NPT Total Depth
Phase
Description of Operations
._ _.
(hr)
(usft)
06:00 - 11:00
5.00
DRILL
P 9,412.00
PROD1
DRILL 4.25° BUILD SECTION FROM 9412' MD
TOx 'MD
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.88 BPM IN, 2.56 BPM OUT. CIRC
PRESSURE: 2850-2950 PSI
- MUD WEIGHT: 8.64 PPG IN, 8.64 PPG OUT,
ECD: 10.16 PPG
ROP: 25 -35 FT/HR, WOB: 1.5-3.5 KLBS
11:00 - 12:00
1.00
DRILL
P 9,550.00
PROD1
BUILD LANDED, WAIT FOR SURVEY THEN
POOH
- GOOD SURVEY, DYNAMIC FLOW CHECK
WELL
GOOD _DYNAMIC FLOW CHECK, POOH _
12:00 - 13:30
1.50
DRILL
P 9,550.00
PROD1
OPEN EDC
- WASH ACROSS WS THEN PUH TO LOG TIE
IN
-LOG TIE IN
-4' CORRECTION, LOG RA MARKER, RA ON
DEPTHAT9178'
13.30 - 18.15
4.75
DRILL
P 9,550.00
PROD1
STOP POOH, RIH FROM 8800' AND LAY IN 9.8
PPG KWF
- REMOVE 8.6 MUD FROM PITS TO
. ACCOMODATE THE 9.8 TO THE SYSTEM
- 9.8 KWF OUT, STARTING TO LOSE
RETURNS, POOH FILLING 1:1 TO RELENE
THE ECD.
18:15 - 18:30
0.25
DRILL
P 9,550.00
PROD1
COILATSURFACE, CIRCULATE AT MINIMUM
RATE WHILE WAITING FOR PARKER TO PASS
BY RIG.
-MEET WITH WSLAND RIG MANAGER FROM
PARKER AND DISCUSS PARKER RIG MOVING
_
PAST NABORS CDR 2, LINE OF
COMMUNICATION ESTABLISHED AND
EXPECTATIONS DISCUSSED.
-PARKER RIG PASSES BY WITH NO
PROBLEMS.
18:30 - 20:00
1.50
DRILL
P 9,550.00
PROD1
CHANGE OUT BHA
-HOLD PJSM WITH CREW FOR CHANGING
OUT BHA.
-FLOW CHECK WELL FOR 10 MINUTES -NO
FLOW
-BREAK OFF INJECTOR AT 1830 AND POOH
INSPECTING LAT 50' OF COIL FOR
WEAR -GOOD
-LAY DOWN BHA#2
-PICK UP BHA#3 AND MAKE UP INJECTOR AT
1945 HRS
-TEST QTS AND BHA -NO COMMS FROM MWD
-BREAK OFF INJECTOR AT 2000 HRS AND
CHANGE OUT BHA
CT/A/X/I/Wr/BHA
Printed 3/11/2019 12:51:26PM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 03-12
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 1/24/2019 End Date: 2/1/2019
Proiect: PBU Site: 03
AFE No
K3 -0198W -C: (1,820,528.00 )
Page 7 of 12
Hig Nam mo.: GDR -2 Spud Date/time: 10/17/1979 12:00:00AM
Rig Release: 2/4/2019
Rig Contractor. NABORS ALASKA DRILLING INC.
9,550.00
BPUOI: USA00001385
Active datum: KB @64.00usB (above Mean Sea Level)
PARTING AND THE ACTIONS THAT COULD
Date From - To Hrs Task
Code NPT Total Depth
Phase Description of Operations
(hr)
-20:00
(usft)
DRILL
- 00:00 4.00 DRILL
N 9,550.00
PROD? CHANGE OUT AND TROUBLE SHOOT BHA
DRILL
N
-CHANGE OUT PNC, EDC AND DPS- UNABLE
PRODt
RIH WITH BHA #3 TO 8530' AND PERFORM TIE
TO GET GOOD TEST.
IN. CORRECTION -30'
-LAY DOWN BHA
PUMPING RATE ..55 BPM IN, ..09 BPM OUT
!-BUILD TOOLS IN PIPE SHED -FOUND BAD
9.76 PPG IN /_9.71 PPG OUT _
PROD1
WET CONNECT ON USR
-PUMP RATE .75 BPM IN 10.07 BPM OUTAT
-PICKUP AND MAKEUP BHA WrIH NEW USR
START
STILL NOT TESTING.
INCREASES.
-FILLING ACROSS THE TOP.
-RAISE RATE TO FINAL CIRC RATE OF 4.05
BUILD BHA WITH 0 HOUR LOWER SECTION
-OBSERVE OUT RATE INCREASING OVER IN
WITH 40 HR USR, AND UPPER SECTION
RATE..
PROD?
FROM BUILD BHA, TEST IN HOLE ONLY CAN
BREATHING
SEE DPS. LAY DOWN BHA
-STOP PUMPS AND CLOSE IN CHOKE.
BUILD BHA WITH 0 HOUR UPPER SECTION,
SUPERINTENDENT TO DISCUSS SUSPECTED
40 HR USR AND 0 HOUR LOWER. DAISY
BREATHING
j
CHAINEDAND TESTED IN PIPESHED
IN PRESSURE INCREASES 1 PSI PER MINUTE
MAKE UP ON RIG FLOOR.
1/29/2019 00:00 - 00:15
00:15 - 02:45
02:45 - 04:30
04:30 - 06:00
0.25— —�
DRILL
I
�. P-
9,550.00
2.50
DRILL
PARTING AND THE ACTIONS THAT COULD
AND SHOULD BE TAKEN. GOOD DISCUSSION
_
9,550.00
1.75
DRILL
P
9,550.00
1.50
DRILL
N
9,550.00
Printed 3/1112019 12r51:26PM **All depths reported in Drillers Depths"
NOTE: HOLD KICK WHILE TRIPPING DRILL
WITH TOOLS OUT OF THE HOLE. DISCUSSED
THE SCENARIO OF AN ACCUMULATOR HOSE
PARTING AND THE ACTIONS THAT COULD
AND SHOULD BE TAKEN. GOOD DISCUSSION
_
BY THE CREW._
PRODt
FINISH MAKING UP BHA
-TEST MWD TOOLS -GOOD TEST
-TEST OTS TO 3500 PSI GOOD TEST.
INJECTOR ON AT 0010 HRS
PRODt
RIH WITH BHA #3 TO 8530' AND PERFORM TIE
IN. CORRECTION -30'
CONTINUE TO RIH TO WINDOW
PUMPING RATE ..55 BPM IN, ..09 BPM OUT
9.76 PPG IN /_9.71 PPG OUT _
PROD1
START TO DISPLACE TO 8.6 PPG.
-PUMP RATE .75 BPM IN 10.07 BPM OUTAT
START
-SLOWLY RAISE PUMP RATE AS OUT RATE
INCREASES.
-RAISE RATE TO FINAL CIRC RATE OF 4.05
BPM IN 14.0O BPM OUT
-OBSERVE OUT RATE INCREASING OVER IN
RATE..
PROD?
MONITOR WELL FOR SUSPECTED
BREATHING
-STOP PUMPS AND CLOSE IN CHOKE.
-SHUT IN PRESSURE 518 PSI, CALL WELLS
SUPERINTENDENT TO DISCUSS SUSPECTED
BREATHING
-DURING FIRST 10 MINUTES OF BEING SHUT
IN PRESSURE INCREASES 1 PSI PER MINUTE
TO 528 PSI. AFTER 10 MINUTES PRESSURE
STARTED TO DROP AT 3 PSI PER MINUTE.
-AFTER DISCUSSION WITH
SUPERINTENDENT AND WOM. AGREED TO
BLEED 2 BELS BACK AND MONITOR FOR 10
MINUTES.
-AFTER LINING UP, OPENED CHOKE FOR
APPROXIMATELY 1 MINUTE AND BLED FROM
478 PSI TO 448 PSI. NO RETURNS OBSERVED
SHUT BACK IN AND DISCUSS RESULTS
Printed 3/1112019 12r51:26PM **All depths reported in Drillers Depths"
NorthAmenca- ALASKA - BP
Operation Summary Report
Common Well Name: 03-12
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 1/24/2019
Project: PBU Site: 03
AFE No
End Date'. 2/112019 X3 -0198W -C:(1,820,528,00)
Rig Release: 2/4/2019
Page 8 of 12
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @64.00usR (above Mean Sea Level)
BPUOI: USA00001385
Date From - To Hrs Task
Code NPT Total Depth
Phase Description of Operations
(hr) _
_(us%)
_
06:00 - 07:00 1.00 DRILL
N 9,550.00
PROD1 MONITOR WELL FOR SUSPECTED
BREATHING
-DISCUSS RESULTS OF BLEED BACK WITH
WELLS SUPERINTENDENT AND WOM.
-AGREE TO PLAN FORWARD FROM WELLS
SUPERINTENDENT AND WOM TO FINISH
CIRCULATION TO 8.6 MUD THEN PERFORM
AN EXHALE TEST
- VERIFY LINE UP'S TO THE COIL AND TT
LINES
- HOLD A PJSM WITH ALL CREW MEMBERS
TO DISCUSS THE PLAN FORWARD
- VERIFY TT LINE IS CLEAR WITH AIR
0700 - 0745 0.75 DRILL
N 9,550.00
PRODi ON LINE WITH PUMP, OPEN CHOKE WHEN
ECD IS AT I O.O PPG
- RATE =0.50 BPM WHP =422 PSI ECD=
9.86 PPG ANN PSI = 4395 PSI
- CALL WSUPT NEED TO INCREASE PUMP
RATE TO INCREASE RETURN RATE TO KEEP
FROM FREEZING THE TT LINE, OK TO
INCREASE RATE
0745 - 1000 2.25 DRILL
N 9,550.00
PROD1 OUT DENSITY IS STABLE AT 8.72 PPG
-SHUTDOWN PUMPAND ALLOW WHP TO
STABILIZE TO START EXHALE TEST
- WHP STABLE AT 425 PSI, ZERO OUT MM AND
BLEED OFF 2 BBLS
- WHP STABILIZED AFTER 19 MIN AT 389 PSI
- DISCUSSED RESULTS WITH WOM AND
WSUPT
- PERFORM 2 MORE EXHALE TESTS OF 2
BBLS AND CALL BACK WITH RESULTS.
- STARTING PRESSURE AT 389 PSI, OPEN
CHOKE ABD BLEED BACK 2 MORE BBLS
- BLED BACK 2 BBLS, CLOSE CHOKE AND
MONITOR
- WHP HAS STABILIZED AT 343 PSI, OPEN
CHOKE AND BLEED BACK 2 MORE BBLS
- WHP HAS STABILIZED AT 292 PSI, CALL
WSUPT AND DISCUSS
1000 - 10:45 0.75 DRILL N 9,550.00 PROD? PLAN FORWARD, EXHALE TEST SHOWS
DOWNWARD TREND IN PRESSURE AND NO
INCREASE IN WHP
- PERFORM A DYNAMIC FLOW CHECK AT 0.2
BPM MAINTAINING 9.5 ECD, IF IN & OUT
RATES ARE STABLE CONTINUE ON WITH
DRILLING OPERATIONS WATCHING RETURNS
FOR CHANGES IN OUT RATE OR DENSITY AT
BOTTOMS UP AND DIVERT TO TIGER TANK
- START DYNAMIC FLOW CHECKAT 0.2 BPM,
TOOK 1.9 BBLS TO GET RETURNS
-WHP=116PSI ECD=9.6PPG ANNPSI=
4279 PSI
- LOOSING FLUID AT 0.2 BPM WHILE TRYING
TO MAINTAIN A 9.5 OR > ECD CALL WSUPT
AND DISCUSS
Printed 3/11/2019 12:51:26PM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 9 of 12
Common Well Name: 03-12
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 1/24/2019 End Date: 2/1/2019
X3 -0198W -C: (1,820,528.00)
Project: PBU --
_ Site: 03
Rig Name/No.: CDR -2
Spud Date/Time: 10/17/1979 12*00:IMAM
Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001385
Active datum: KB @64.00usft (above Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft) .
10:45 - 11:45
1.00 DRILL P 9,550.00 PROD1
DECISION MADE TO GO BACK TO DRILLING,
SHUT DOWN THE PUMP HOLDING 9.5 ECD.
CLOSE THE EDC AND RIH TO BOTTOM AT MIN
RATE
- STOP AT 9434' FOR JORPS
- WO L3 OCN TO DRILL WITH LOSSES
- INCREASE RATE TO 2.8 BPM TO SEE HOW
MANY BBLS IT TAKES FOR OUT RATE TO
STABILIZE
'- WELL TOOK 20 BBLS AND OUT RATE IS
STABLE AT 2.8 BPM NO LOSSES
I- L3 OCN TO DRILL WITH LOSSES IN HAND,
CONTINUE DRILLING OPERATIONS
11:45 - 17:00
5.25 DRILL P 9,550.00 PRODt
DRILL 4.25" BUILD SECTION FROM 9550' MD
' TO 9695' MD
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.88 BPM IN, 2.92 BPM OUT. CIRC
PRESSURE: 3250-3450 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.64 PPG OUT,
ECD: 10.06 PPG
-ROP: 25-50 FT/HR, WOB: 2.0-3.5 KLBS
- LOSSES = 31 BBLS IN 5.25 -HRS SINCE
RESTARTING DRILLING
1700 - 0000
7.00 DRILL P 9,550.00 PROD1
DRILL 4.25" BUILD SECTION FROM 9695' MD
TO 9890' MD
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.85 BPM IN, 2.83 BPM OUT. CIRC
PRESSURE: 3350-3500 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.64 PPG OUT,
ECD: 10.06 PPG
- 25 FT/HR, 0-3.5 KLBS
LOP:
ES = 4 N 7 -HR
-LOSSES=4I BBLS IN 7 -HRS
- L
NOTE: 150' WIPER TRIP AT 9850'
1/30/2019 00:00 - 05:15
5.25 DRILL P 10,003.00 PROD1
DRILL 4.25" LATERAL SECTION FROM 9890'
MO TO 10003' MO
- FREE SPIN: 2650 PSI, 2.85 BPM
- RATE: 2.88 BPM IN, 2.88 BPM OUT. CIRC
PRESSURE: 3350-3500 PSI
- MUD WEIGHT: 8.76 PPG IN, 8.72 PPG OUT,
ECD: 10.30 PPG
- ROP: 20 - 25 FT/HR, WOB: 2.0-3.5 KLBS
.-LOSSES= 16 BBLS IN -5 -HRS
05:15 - 06:15
1.00 DRILL P 10,000.00 PROD?
WIPER TRIP TO WINDOWAT 9185'
-PUMP 5X5 LOW/ HI VIS SWEEP.
-PULL TO WINDOW
- LOG TIE IN ACROSS WS RA
- CORRECT DEPTH -3' AND RIH TO CONTINUE
DRILLING
0615 - 11:00
4.75 DRILL P 10,000.00 PROD1
DRILL 4.25" LATERAL SECTION FROM 10003'
MD TO 10110' MD
- FREE SPIN: 3400 PSI, 2.86 BPM
- RATE: 2.88 BPM IN, 2.88 BPM OUT. CIRC
PRESSURE: 3350-3500 PSI
- MUD WEIGHT: 8.76 PPG IN, 8.72 PPG OUT,
ECD: 10.16 PPG
- ROP: 20 - 25 FT/HR, WOB: 2.0-3.7 KLBS
Printed 3/11/2019 12.51 26PM **All depths reported in Drillers Depths"
North America - ALASKA - Bla
Operation Summary Report
Common Well Name. 03-12
Event Type. RE-ENTER- ONSHORE(RON) Start Date. 1/24/2019 End Date: 2A/2019
Project: PBU Site: 03
Rig Name/No.: CDR -2 Spud Date/Time: 10/17/1979 12:00 OOAM
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @64.00usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
(hr) (usft)
11:00 - 11:30 0.50 DRILL P 10,110.00 PROD1
Page 10 of 12
AFE No
X3 -0198W -C. (1,820,52800)
BPUOI. USA00001385
Description of Operations
"`HELD A KWT DRILL WITH H2S AT
SURFACE—
DRILLER CALLED OUT A KWr DRILL AND
SIMULATED PICKING UP OFF BOTTOM AND
SHUTTING DOWN THE PUMP TO FLOW
CHECK THE WELL. THE DERRICK MAN SAID
THERE WAS STILL FLOW AT THE SHAKER
AND THE WELL WAS SIMULATED SHUT IN AS
PER OUR STANDING ORDERS. ALL HANDS
CALLED OUT FROM THEIR STATIONS AND
PRESSURES WERE BEING MONITORED. I
ELEVATED THE DRILL BY TELLING THE
DRILLER HIS RACKOFF WAS LEAKING AND
HE SIMULATED INCREASING THE RACKOFF
PRESSURE. I TOLD HIM THAT FAILED AND WE
NOW HAVE H2S ON THE RIG FLOOR. HE
SIMULATED SHUTTING IN HIS UPPER PIPE
RAMS AND TOLD ALL NON-ESSENTIAL
PERSONNEL TO EVACUATE THE RIG AND GO
TO THE PRIMARY MUSTER AREAAND HE AND
THE FLOOR HAND WOULD SECURE THE
WELL THEN MUSTER.
Printed 3/11/2019 12:51:26PM ""AII depths reported in Drillers Depths"'
DRILL FROM START TO FINISH TOOK 4:05
FOR MORE INFO, PLEASE REVIEW EWELLS
_
REPORT NUMBER 138446
11:30 - 17:30 6.00 DRILL P
1 10,110.00
PROD? DRILL 4.25" LATERAL SECTION FROM 10110'
MD TO 10400' MD
- FREE SPIN: 3800 PSI, 3.00 BPM
- RATE: 3.06 BPM IN, 3.03 BPM OUT. CIRC
PRESSURE: 3350 - 3500 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.81 PPG OUT,
ECD: 10.33 PPG
- ROP: 23 - 60 FT/HR, WOB: 2.0-3.7 KLBS
LOSSES = 42 BBLS IN 12 -HRS
1730 - 1900 1.50 DRILL P
10,460.00
PROD? DRILL 4.25" LATERAL SECTION FROM 10400'
MD TO 10460' MD
- FREE SPIN: 3800 PSI, 3.00 BPM
- RATE: 3.06 BPM IN, 3.03 BPM OUT. CIRC
PRESSURE: 3350-3500 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.81 PPG OUT,
ECD: 10.33 PPG
- ROP: 23 - 60 FT/HR, WOB: 2.0-3.7 KLBS
- LOSSES = 42 BELS IN 12 -HRS
- LONG WIPER TO WINDOW
1900 - 2230 3.50 DRILL P
10,460.00
PROD? PERFORM LONG WIPER TRIP TO WINDOW
FROM 10460' MD TO 8500' MD
- RATE'. 3.03 BPM IN, 3.02 BPM OUT. CIRC
PRESSURE: 4000 PSI
- OPEN EDCAT WINDOW, JETTRAYAT3.5
BPM. PULL SLOWLY THROUGH 7-5/8". JET
UP TO 8500'
- LOG DOWN FOR PDC TIE-IN FROM 8500' TO
8520' MD (FORMATIONS WITH «6'
CORRECTION
- LOG CCL LOG FROM 8600' TO 9150'. CLOSE
EDC, RUN THROUGH BUILD AT 9430'. STACK
WEIGHT. PUANDGOBY. STACKAGAINAT
9516'. PLAY WITH RATES, STAYAS DRILLED.
BRING RATE UP TO DRILLING RATE. SLIGHT
SET DOWN AND BOBBLE. RUN TO TD
WITHOUT ANYMORE ISSUE
Printed 3/11/2019 12:51:26PM ""AII depths reported in Drillers Depths"'
Common Well Name: 03-12
Event Type: RE-ENTER- ONSHORE (RON)
Project: PBU
North America - ALASKA - BP Page 11 of 12
Operation Summary Report
Stan Date: 1/24/2019
Site: 03
End Date: 2/1/2019
AFE No
K3 -0198W -C: (1,820.528.00)
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @64.00usR (above Mean Sea Level)
BPUOI: USA00001385
Date From - To
Him Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
22'.30 - 00:00
1.50 DRILL
P 10,487.00
PROD1
DRILL 4-1/4'LATERAL FROM 10460'MD TO
10487'
- FREE SPIN: 3760 PSI, 3.03 BPM
- RATE: 3.03 BPM IN, 3.02 BPM OUT. CIRC
PRESSURE: 3760-4009 PSI
- MUD WEIGHT: 8.66 PPG IN, 8.60 PPG OUT,
ECD: 10.30 PPG
- ROP: 15-20 FT/HR, WOB: 2.6-3.0 KLBS
-PERFORM MUD SWAP.
1/31/2019 0000 - 0400
400 DRILL
P 10.615.00
PRODi
DRILL 4-1/4" LATERAL FROM 10487'MD TO
10615
'- FREE SPIN: 3700 PSI, 3.04 BPM
- RATE: 3.04 BPM IN, 3.01 BPM OUT. CIRC
PRESSURE: 3700 - 3938 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.57 PPG OUT,
ECD: 10.1 PPG AT WINDOW CHOKE
PRESSURE: 262 PSI
-ROP: 48 FT/HR, WOB: 2.8-3.2 KLBS
PUMP 10 BBLS LOVIS / 10 BBLS HIVIS
PERFORM 1_50' BHA WIPER _
04:00 - 05'.45
1.75 DRILL
P 10615.00
PROD1
DRILL 41/4' LATERAL FROM 10615
- FREE SPIN: 3700 PSI, 3.04 BPM
-RATE: 3.04 BPM IN, 3.01 BPM OUT. CIRC
PRESSURE: 3700-3938 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.63 PPG OUT,
ECD: 10 PPGAT WINDOW CHOKE
PRESSURE: 195 PSI /(
-ROP: 48 FT/HR, WOB: 2.8-3.2 KLBS l•
_
0545 - 0700
1.25 DRILL
P 10,670.00
PROD1
GEO HAS CALLED TD, PU SLOW WHILE
CIRCULATING A BOTTOMS UP TO CONFIRM
07:00 - 09:00
2.00 DRILL
P 0 0^
PROD1
BOTTOMS UP SAMPLE STILL SHOWS WE ARE
q14
STILL IN Z4, CONTINUE DRILLING AS PER
PLAN
09:00 - 1030
1.50 DRILL
P 10,7 o
0
PROD1
STOP DRILLING AND CIRCA BOTTOMS UP
S
LOOKING FOR SHUBLIK OR HRZ
u{I
- BTM'S UP STILL SHOWING Z4, CONI
DRILLING
1030 - 1530
5.00 DRILL
P 10,7 OQ.
PROD1
TD CALLED, FLAG ASAM PLE AND PUMP U P A
`� i, f
SURVEY ON BOTTOM THEN POOH TO
WINDOW
- TOOL STARTING TO LOOSE COMMS, CALL
WSUPT & ODE AND DISCUSS
- GEO SAID HE IS SEEING A LITTLE MORE
PYRITE IN THE SAMPLE WHICH THEY WILL
SEE AT THE BASE OF THE SHUBLIK
- BELOW THE WINDOW, JOG IN HOLE 100'
THEN PU ABOVE THE WINDOW TO OPEN THE
EDC
- PULLED THROUGH THE WINDOW CLEAN,
OPEN EDC, JETACROSS WS TRAY AND PUH
SLOW THROUGH 7-5/8" SECTIONS TO 8500'
- WITH THE EDC OPEN THE TOOL IS
WORKING FINE IT LOOKS LIKE THE
AGITATION FROM THE AGITATOR MIGHT BE
AFFECTING A CONNECTION IN THE TOOL.
CALL ODE AND WSUPT AND DISCUSS TOOL
- LOG TIE IN WITH A+6' CORRECTION
- STILL GETTING A FAIR AMOUNT OF
CUTTINGS ACROSS THE SHAKER, RIH WHILE
CIRCULATING WELL CLEAN AND COMING UP
Printed 3/11/2019 12 51 **All depths reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Common Well Name: 03-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 1/24/2019 End Date: 2/1/2019 X3 -0198W -C'. (1,820,528.00)
Project: PBU Site: 03
Page 12 of 12
Rig Name/No.: CDR -2
Spud Date/Time: 10/17/1979 12:00:OOAM
Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001385
Active datum: KB (M64.00usft (above
Mean Sea Level)
Date From - To
Him
Task Code NPT Total Depth
Phase Description of Operations
_
(hr)
_ _ (usft)
15:30 - 15:45
0.25
DRILL P 10,744.00
PROD? PLAN FORWARD
- MIX BEADS INTO 35 BBLS OF DRILLING MUD
- PRELOAD LINER PILL IN THE COIL
- CLOSE EDC AND DRIFT TO TD AT MIN RATE
MAINTAINING 10.1 PPG AT THE WINDOW
- TAG AT 9446' BUT POPPED THROUGH
- TAG AT 9550' BUT POPPED THROUGH
'-TAG TD, PUMP LINER PILL TO BITAND POOH
LAYING IN
- IF WE ENCOUNTER TROUBLE DRIFTING TO
TO THIS ISA STOP POINT, POOH TO SWAP
OUT MWD TOOLS _
1545 - 1645
1.00
DRILL P 10,745.00
PRO01 TAG TD V DEEPER AT 10745', PU 5' OFF
AN F877RNA—m-17= HECK WELL
AT 0.2 BPM
- DYNAMIC FLOW CHECK IS GOOD, LOST 0.3
BBLS IN 10 MIN
- INCREASE RATE TO 1.0 BPM TO PUMP
LINER PILL TO THE BIT
- POOH LAYING LINER PILL 1:1, 3 BELS OPUT
POOH
- 9950' INCREASE RATE TO 3.0 BPM TO
.
CLEAN OUT THE LEAD OF THE INVERTED
SECTION DOWN THROUGH THE HEALAND
THE BUILD
AT THE WINDOW JOG IN HOLE 100' THEN
POOH ABOVE THE WINDOW
- CLOSE THE CHOKE TO MAINTAIN 10.01 ECD
AND OPEN THE EDC
- 16:45 - 20:00
3.25
DRILL P 10,745.00
PROD? EDC IS OPEN, PUMP AT MAX RATE, JET
ACROSS WS THEN POOH TO SURFACE
FOLLOWING THE PRESSURE SCHEDULE FOR
8.6PPG MUD TO MAINTAIN 10.1 AT THE
WINDOW
NO SUBSTANTIAL CUTTINGS ON TRIP.
'.120:00 - 00:00
4.00
DRILL P 10,745.00
PRODi CONDITION WELLBORE
I
-2.49 BPM IN /2.63 BPM OUT
- 8.66 PPG IN 18.64 PPG OUT
- MAINTAIN 10.0 PPG AT WINDOW
FOLLOWING PRESSURE SCHEDULE.
- LOG TIE IN FROM 8500'70 8565'FOR A-31'
CORRECTION.
- RIH IN HOLE TO 9160'
- PAINT YELLOW FLAG AT 8515.05' BIT DEPTH
.(.8431.32' EOP) —_
2/1/2019 00:00 - 02:00
2.00
DRILL P 10,745.00
PROD1 POOH
- PAINT WHITE FLAG 6939.49' BIT DEPTH
(6855.76' EOP)
-1.04 BPM IN / 0.65 BPM OUT
-9.85 PPG IN /9.76 PPG OUT
02:00 - 03:30
1.50
DRILL P 10,745.00
PRODi MONITOR WELL FOR 10 MINUTES AT BHA'.
STATIC
-CLOSE EDC, POWER DOWN
- INJECTOR OFF: 02:45
-INSPECT 100' OF PIPE. GOOD
-LAY BHA DOWN.
Printed 3/11/2019 12.51 26PM "All depths reported in Drillers Depths.'
Common Well Name: 03-12
Event Type: COM- ONSHORE (CON)
Project: PBU
Rig Name/No.: CDR -2
Rig Contractor. NABORS ALASKA DRILLING Ih
Achve datum: KB @64.00usB (above Mean Sea
Date From - To His
(hr)
2/1/2019 03:30 - 04:15 0.75
04:15 - 0930 5.25
09.30 - 12.00 2.50
12:00 - 17:00 5.00
North America - ALASKA - BP
Operation Summary Report
Start Date: 2/1/2019 End Date'. 2/4/2019
S8e: 03
Spud Date/Time: 10/17/1979 12:00:OOAM
AFE No
X3 -0198W -C: (784,308,00)
BPUOI: USA00001385
Page 1 of 6
Task Code NPT Total Depth I
Phase Description of Operations
(usft) I
RUNPRD
BOPSUR P 10,745.00
RUNPRD PJSM, DISCUSS PLAN FORWARD
PERFORM WEEKLY BOPE FUNCTION _TEST
CASING P 10,745.00
RUNPRD LOCKOUT E -LINE. BHI REMOVE DOC
BRING BOT EQUIPMENT IN
- PUMP SLACK OUT
- PUMPED OUT 302', CUTAND BOOT ELINE
__
- DRIFT & MU SWIVEL, STINGER & NOZZLE,
I _
STAB ON AND PUMP 7/8" DRIFT BALL
- CHECK PACKOFFS, NEEDED TO BE
19:30 - 00:00
CHANGED
CASING P
- LOAD AND LAUNCH 7/8" STEEL BALL
RUNPRD
- CLOSE SWAB VALVE AND PRESSURE TEST
_ _PACKOFFS
CASING P 10745.00
RUNPRD GOOD TEST ON PACKOFFS, OPEN SWAB TO
- BREAK CIRCULATION
A CLOSED CHOKE, NO PRESSURE
FLOW CHECK WELL
GOOD NO FLOW
- PU INJECTOR AND CHECK FOR THE 7/8"
BALL
STEADILY PUTTING WELL ON CHOKE TO
- NO BALL, STAB BACK ON, ROLL REEL IN
HOLE AND PUMP AT MAX RATE
SHUT DOWN, TAG UP, VERIFY NO FLOW
AND PU THE INJECTOR TO CHECK FOR THE
BALL
RIH TO WINDOW FLAG
'- RECOVERED BALL, RU TO RUN LINER
CASING P
- PIPE COUNT VERIFIED WITH DRILLER, TP,
RUNPRD
ESL, BOT & NORTHERN SOLUTIONS
_ - HOLD A PJSM TO RUN LINER
' CASING P 10,745.00
RUNPRD MU LINER AS PER APPROVED SUMMARY
- HOLD A KWr DRILL, NOTABLE TO LATCH
SAFETY JOINT, JOINT WAS TO HIGH IN THE
V -DOOR. LOWERED THE SAFETY JOINT TO A
SCRIBED MARK ON THE JOINT AND THE
ELEVATORS LATCHED UP. DRILL COMPLETED
IN 4:18
HALFWAYTHROUGH THE LINER WE HAVE
LOST 7 BELS OF MUD
1700 - 1930 2.50
CASING P
10,745.00
RUNPRD
ALL LINER RAN, SWAP OVER TO 2-7/8
ELEVATORS TO PU THE COLLARS
VERIFIED COUNT. MAKEUP INJECTOR
__
_
I _
__
SWAP COILAND LINER OVER TO 8.7 PPG
19:30 - 00:00
4.50
CASING P
10,745.00
RUNPRD
RIH
- BREAK CIRCULATION
- CIRCULATED 9.8 PPG OUT OF WELL WHILE
STEADILY PUTTING WELL ON CHOKE TO
MAINTAIN BHPAT 4000' PER CON #3
RIH TO WINDOW FLAG
2/212019 00:00 - 02:30 2.50
CASING P
10,745.00
RUNPRD
RIH TO WHITE FLAG AT 9106.37'. -37.5'
CORRECTION TO 9068.88'.
CORRECT DEPTH. RUN INTO 9170'. PICKUP
INTO TENSION.
-CIRCULATE REMAINING 9.8 PPG FLUID OUT
WHILE INCREASING CHOKE PRESSURE
Printed 3/11/2019 12*52:OOPM **All dephts reported in Drillers Dephts"
North America - ALASKA - BP
Operation Summary Report
Page 2 of 6
Common Well Name: 03-12
AFE No
Event Type: COM- ONSHORE (CON) Start Date. 2/1/2019
End Date: 2/4/2019
X3 -0198W -C: (784,308.00)
Project PBU Site: 03
--- -
Rig Name/No.: CDR -2 Spud Date/Time: 10/17/1979
12:00:OOAM
Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001385
Active datum: KB @64 00usR (above Mean Sea Level)
Dale From - To His Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
02:30 - 08:20 5.83 CASNGi P
10,745.00 RUNPRD
RUN LINER IN OPEN HOLE
-0.25 BPM IN /0.35 BPM OUT
- 8.81 PPG IN 18.85 PPG OUT
- PU WEIGHT 49K @ 30FPM
- RIH WEIGHT 26K @ 30 FPM
- RIH CLEAN AT 50 FPM TILL 10242' MD
-BEGIN WORKING LINER. CIRCULATE IN
COMPRESSION.
- TRY MULTIPLE PUMP RATES. MAKE ITAS
DEEP AS 10300'
- CONTINUE TO CIRCULATE. DISCUSS LVT
WITH ODE. START BUILDING SPACERS
- ONLINE WITH SPACERS AND 20 BBLS OF
LVT
- CAN'T GET PRIME ON THE LVT, MOVE LVT
PUP TO ANOTHER SUCTION LINE
- PU AND TRY RIH, MADE IT TO 10307' THEN
SAT DOWN
-GOT GOOD PRIME, ONLINE WITH LVT
- PUMP 5 BBLS OF LVT OUT THEN LET SOAK
- PU TO 54K, RIH AND RAN PAST 70 10325'
- PU AND LOST IO', SET DOWN AT 10315',
PUMP 5 BBLS OF VLT OUT AND SOAK
. -CLEAN PU TO 54KAGAIN, RIH AND MADE IT
TO 10332 THEN 10334
- PUMP 2 BBLS OUT THEN WORK PIPE AGAIN
- WORKED DOWN TO 10358', PUMP 2 MORE
BBLS OUT
- PU AND WORKED DOWN TO 10434 WITH A
COUPLE SET DOWNS BUT POPPED
THROUGH TO THIS DEPTH
- PUMP 2 BBLS OUTAND LET SOAK, AND
MAKING HOLE
- DROVE BY YELLOW FLAG AT 10847' WITHIN
T OF CORRECTED DEPTH
- MADE IT DOWN TO 1 651
- PUMP 2 BBLS OF LVTTOUTAND LET SOAK
- WORKED DOWN TO 10723, PUMP THE LAST
2 BBLS OUT
"All dephts reported in Drillers Dephts"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 03-12
Event Type: COM -ONSHORE (CON)
Start Date: 2/1/2019
Project: PBU
Site. 03
Rig Name/No.: CDR -2
Spud Date/Time: 10/17/1974
Rig Contractor: NABORS ALASKA DRILLING INC.
8740.42'. LINE UP TO CIRCULATE LVT OUT O
Active datum: KB @64.00ush (above Mean Sea Level)
Date From - To Him
Task Code NPT
(hr)
-- -__
--
08:20 - 10:15 1 92
CASING P
End Date: 2/4/2019
AFE No
X3 -0198W -C: (784,308,00)
BPUOI: USA00001385
Page 3 of 6
Total Depth
Phase Description of Operations
lush)
10,745.00
RUNPRD LINER IS ON BOTTOM TOP OF LINERAT
8740.42'. LINE UP TO CIRCULATE LVT OUT O
THE WELL
DISCUSS STRATEGY TO CIRC A BOTTOMS UP
THEN FINGERPRINT THE TRAPPED
PRESSURE WE HAVE BEEN HOLDING
PLAN FORWARD
- CIRC OUT LVT, FINGERPRINT BLEED OFF AS
PER ODN #2 NOT TO EXCEED 23 BBLS (20
BBLS THE WELLTOOK TO GET 1:1 RETURNS
. WHEN PUMPING, +3 BBLS WE'RE ALLOWED
TO GET BACK BEFORE WE HAVE TO SHUT IN
FOLLOWING OUR WELL MONITORING MATRIX
ONUNE WITH PUMPAT 2.33 BPM IN AND OUT
WITH 285 PSI WHP, DECREASE WHP AS
NEEDED TO MAINTIAN 1:1 RETURNS
- OUT DENSITY DROPPING OFF, SEND
RETURNS TO TT AT 135 BBLS OUT
- RETURNS ARE CLEAN, WHP DOWN TO 109
PSI WITH A FULL OPEN CHOKE - 2.32 IN AND
' 2.25 OUT RATES
.- BOTTOMS UP IS CLEAN, PUMP A FEW BBLS
THEN BRING RETURNS INSIDE
- SHUT DOWN PUMP, CLOSE THE CHOKE
AND ALLOW PRESSURE TO STABILIZE
10:15 - 11:15 1.00 CASING P 10,745.00 RUNPRD WHP STABLE AT 455 PSI, OPEN CHOKE AND
START FINGERPRINT WITH WOS NEWLON
ON LOCATION
11:15 - 11:45 0.50 CASING P 10,745.00 RUNPRD GOT BACK 14.64 BBLS TO NO FLOW, CALL
11'45 - 1245 1.00 CASING N
12:45 - 15:15 2.50 CASING N
ODE AND DISCUSS A PLAN FORWARD TO
CIRC A BOTTOMS UP TO MAKE SURE THE
BLEED OFF DID NOT BRING ANY WELLBORE
FLUIDS INTO THE WELL
10,745.00 RUNPRD PLAN FORWARD
- CIRC A BOTTOMS UP, SHUT DOWN PUMP
AND FINGERPRINT AS PER OCN AND RP, IF
FINGERPRINT SHOWS DECREASING TREND
PUMP OFF AND POOH FOR CMT
WORKSTRING
ONLINE AT 2.85 BPM CIRCULATING A
BOTTOMS UP
- WELL TOOK 13.2 BBLS BEFORE GETTING
1:1 RETURNS
10,745.00 RUNPRD BOTTOMS UP IS CLEAN, PUMPADDITIONAL
15 BBLSAND SHUT DOWN PUMP
START FINGERPRINT
- 10 MINUTE FINGERPRINT- TREND IS
CONTINUALLY DECREASING IN RATE CALL
WOS AND DISCUSS
- WOS AGREES, DECREASING TREND IS
INLINE TO CONTINUE OPS
-ONLINE WITH PUMP TO PUMP OFF LINER
- PU IS CLEAN AT 45K, POOH
-STOP AND REPAINT WHITE WINDOW FLAG
BHI = 9070.25 (ORIGINAL CORRECTION WAS
TO 9068.88') 1.37' OFF
EDP = 6869.6
Printed 3/11/2019 12:52:OOPM **All dephts reported in Drillers Dephts"
North America - ALASKA - BP
Operation Summary Report
Page 4 of 6
Common Well Name. 03-12
- 19.00
2.25
AFE No
Event Type. COM- ONSHORE (CON)
Start Dale: 2A/2019
End Date: 2/4/2019
X3 -0198W -C: (784.308.00)
Project: PBU
Site: 03
2200
- 0000
Rig Name/No.: CDR -2
Spud Date/Time: 10/17/1979
12:00:OOAM
Rig Release: 2/4/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
1.50
CEMT
BPUOI: USA00001385
Active datum: KB @64.00usft (above Mean Sea Level)
DISCONNECT, XO, 17.66' OF 1" GSH HYDRIL
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_ (usft)
15:15 - 16:45 1.50
CASING P
10,745.00 RUNPRD
FLOW CHECK WELL
16:45
- 19.00
2.25
CASING
P
1900
- 2200'.
3.00
CEMT
N
2200
- 0000
2.00
CEMT
i
N
2/3/2019 00:00
- 01:30
1.50
CEMT
N
01:30 - 09:30 8.00 CEMT P
Printed 3/11/2019 12:52:00PM **All dephts reported in Drillers Dephts'•
-GOOD 20 MINUTE FLOW CHECK, WELL IS
DEAD, TAG UP, REMOVE THE INJECTOR AND
LD THE BHA
10,745.00
RUNPRD 'CUT OFF CTC AND REHEAD WITH SLIM CTC
- PULL TEST CTC TO 45K. GOOD TEST
- PRESSURE TEST CTC TO LOW 250 / HIGH
4000#
- PREP FLOOR FOR RUNNING WORKSTRING
10,745.00
RUNPRD CEMENTING WORK STRING
-MAKE UP NS ORCA STINGER, 1/2" BALL
DISCONNECT, XO, 17.66' OF 1" GSH HYDRIL
PUPS
- MAKE UP 52 JOINTS OF 1-1/4" CSH
WORKSTRING
- MAKE UP XO, 5/8" BALL DISCONNECT, XOv
- MAKE UP 2 JOINTS 2-1/16" CSH JOINTS
MAKE UP INJECTOR: 21:40
10,745.00',
RUNPRD RIH WITH CEMENTING WORKSTRING BHA#5
- RATE: 0.25 BPM IN, 0.70 BPM OUT. CIRC
PRESSURE: 1037 PSI
- MUD WEIGHT: 8.80 PPG IN, 8.84 PPG OUT
- STOPAT WHITE FLAG AT 8599.65'.
CORRECT TO 8565.44' MD (WHITE FLAG)
WITH-34.2'CORRECTION
-RIHWEIGHT20K. P_UWEIGHT41K _
10,745.00
RUNPRD RIH TO TOP OF LINER
- BREAK CIRCULATION
- 1.55 BPM @ 2103 PSI TOOK 3.9 BBLS TO
GET OUT RATE STABLE AT 1.43 BPM
- RIH TO 10650'. BREAK CIRCULATION 1.57
BPM @ 2260#
- PU WEIGHT 45K @ 30 FPM. RIH WEIGHT
21K
- OPEN PUMP BLEED. RIH AND STACK 10K
AT 10724'
- CLOSE PUMP BLEED. COME ONLINE WITH
PUMP.
- PRESSURE UP TO 3700# BEFORE DISC
WENT. GOOD INDICATION STUNG IN
- BREAK CIRCULATION 1.5 BPM @ 3055 PSI _
10,745.00
RUNPRD CONDITION WELLBORE FOR CEMENT
- MUD WEIGHT: 8.5 PPG IN, 8.85 PPG OUT
— RATE: 1.55 BPM IN, 1.46 BPM OUT CIRC
PRESSURE: 3063 PSI
- SLIP STREAM CEMENTERS KCL.
PRESSURE TEST CEMENTERS TO 4700#
-ONCE 1% KCL TURN CORNER. PUTWELL
ON CHOKE TO MAINTAIN 1:1. CALLAND
DISCUSS WELLBORE BREATHING WITH
ACTING WELLSUPT. FINISH CIRCULATING
11%KCLAROUND. CALLAND DISCUSS
CEMENTING STRATEGY WITH ODE
Printed 3/11/2019 12:52:00PM **All dephts reported in Drillers Dephts'•
Common Well Name: 03-12
Event Type: COM- ONSHORE (CON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 2/1/2019 End Date 2/4/2019
Page 5 of 6
AFE No
K3 -0198W -C: (784,308,00)
Project: PBU Site: 03
Rig Name/No.: CDR -2 Spud Date/Time: 10/17/1979 12oO:OOAM Rig Release: 2/4/2019
Active datum: KB @64.00usB (above Mean Sea Level)
Date From - To Hrs Task
(hr)
09:30 - 10:15 0.75 CEMT
10:15 - 14.00 3.75 CEMT
Code NPT Total Depth
(usit)
P 10,745.00
Phase
RUNPRD
P 10,745.00 RUNPRD
Printed 3/11/2019 12:52:OOPM «.AAI dephts reported in Drillers Dephts—
BPUOI: USA00001385
Description of Operations
RECEIVED OCN M5 TO BLEED OFF WHP FOR
CEMENT JOB AND MONITOR
- OPEN CHOKE AND HOLD SAME POSITION
TO BLEED OFF
- OUT RATE IS DECREASING AT EACH 1 MIN
INTERVAL
- IN AND OUT RATES ARE STABLE, GAINED
13.6 BBLS AND IS CONSISTANT WITH
PREVIOUS BLEED OFFS AT THE HIGHER MUD
WEIGHTS
s
OPEN CHOKE AND BLEED OFF RESIDUAL
WHP OF 66 PSI
- 0.8 BBL GAIN FROM 66 PSI BLEED OFF
- IN AND OUT RATES ARE STABLE, WHP AT 0
PSI
- WE HAVE MET THE TERMS OF THE OCN TO
CONTINUE OUR OPERATIONS TO PUMP CMT
HOLD A PJSM TO BATCH AND PUMP CMT
- DISCUSS MUSTER AREA, FLOW PATHS,
FLUIDS AND VOLUMES
- BOTTOMS UP IS CLEAN, NO CHANGE IN
RATE OR DENSITY
- BATCH UP CMT
- CMT WET AT 10:45, PUMPABLE TO 15:35
PUMP EXHAUST TO THE IN MMAND SHUT
DOWN
- LINE UP CMT VAN TO COIL
-ONLINE WITH 5 BELS OF KCL
- SWAP TO CMT, ZERO IN MM AT 13.5 PPG
AND PUMP 32.9 BBLS OF CMT INTO THE COIL
DOWN AND FLUSH CMT LINE
- ONLINE WITH PUMP, 6.2 BBLS DISPLACED
WHILE FLUSHING LINES
- ONLINE AT 3.3 BPM TO CATCH CMT,
CAUGHT CMT IN 9 BBLS
- 58.4 BBLS AWAY, ZERO OUT MM AND TAKE
RETURNS TO PIT
- OH VOLUME = 14.86 BBLS, -20.5 BBLS AWAY
STARTING TO LOOSE RETURNS -0 5 RPM
- 89.3 BBLS AWAY, SHUT DOWN PUMP WITH 2
BBLS OF CMT IN THE COILAND UNSTING
FROM ORCA VALVE
- OUT MM VOLUME = 29.8 BBLS OF CMT
BEHIND PIPE
- DISPLACE LAST 2 BBLS OF CMT OUT OF
THE COIL WITH EXHAUST PILL
- GOOD EXHAUST PILL AT THE END OF TOOL,
RIH TO WITHIN 10-15' OF THE VALVE
- POOH AT MAX RATE TO TOL, THEN RECIP
ACROSS THE TOL
- CMT BACK TO SURFACE, DUMPED 63 BBLS
TO CLEAN RETURNS
- RECIP ACROSS TOL 3 PASSES AT 5 FPM
- PUH SLOW TO 8300' JETTING AT MAX RATE
(37' ABOVE WHERE THE TOC WOULD HAVE
BEEN IN THE TUBING)
- RIH SLOW TO TOL WHILE DISPLACING TO
9.8 KWr
- PUH TO 8500' AND PUMP 10 BBLS OF KWF
OUT THEN CHASE OOH
Common Well Name. 03-12
Event Type: COM- ONSHORE (CON)
Project: PBU
North America - ALASKA- BP Page 6 of 6
Operation Summary Report
Start Date: 2/1/2019 End Date: 2/4/2019
Site: 03----- --- -----
Spud Date/Time: 10/17/1979 12:00:OOAM
AF'e No
K3 -0198W -C: (784,308.00 )
Rig Release: 2/4/2019
Rig Contractor: NABORSALASKA DRILLING INC.
Active datum: KB @64.00usB (above Mean Sea Level)
BPUOI: USA00001385
Date From - To
Him Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(us8)
14:00 - 15:50
1.83 CEMT
N 10,745.00
RUNPRD 10 BBLS OF 9.8 PPG KWF OUT, POOH
- 1:1 RETURNS WITH FULL OPEN CHOKE
- TRIP SHEET AT IS 1:1 AT 5500'
- 5200' GETTING THE LEAD OF THE 9.8 BACK
TO SURFACE AND WE ARE STARTING TO
LOOSING RETURNS, REDUCE RATE TO 1 BPM
TO REDUCE LOSSES. LOSS RATE DOWN TO
0.2 BPM, CALL ODE AND DISCUSS
- 500'RETURNS ARE STARTING TO IMPROVE
WITH 20 BBLS LOST, LAST FLUID LOSS TOOK
20 BBLS TO STABILIZE AND GET 1.1 RETURNS
1550 - 2000
4.17 CEMT
N 10,745.00
RUNPRD STOP 100' FROM SURFACE, MONITOR IN 8
OUT RATES THEN CALL ODE
- LOOSING -0.1 BPM, SHUT DOWN AND FLOW
CHECK, IF WELL STARTS FLOWING, SHUT IN
AND HOLD PRESSURE TO KEEP FROM
. FLOWING BACK CMT. LOST 21.9 BBLS TOTAL
ONTOOH
- GOOD NO FLOW, ONLINE TO CHECK LOSS
RATE
- LOST 0.1 BBLS IN 10 MIN
'- OK TO CONTINUE OPS TO LD WORK
STRING
- LAV DOWN WORKSTRING. RECOVERED
SNAP LATCH ASSEMBLY.
20:00 - 21:30
1.50 RIGID
P 10,745.00
POST CLEAN AND CLEAR RIG FLOOR
- MAKE UP NOZZLE BHA, GREASE CREW
SERVICE TREE.
LRS RIG UP TO CUSTOMER VALVE._
21.30 - 00'.00
2.50 RIGD
P 10,745.00
POST STAB INJECTOR.
LRS LOAD REEL WITH DIESEL / NEET
METHANOL
RIH TO 550'
PUMP DIESEL OUT NOZZLE, CHASE OUT OF
HOLE,
WELLBORE FREEZE PROTECTED TO 550'
WITH DIESEL. CAPPED THROUGH TREE
WITH NEET.
SHUT MASTER. FLUSH REMAINING NEET
METHAONOL OUT TO TIGER TANK
BREAK DOWN NOZZLE.
2/4/2019 00:00 - 04:00
4.00 RIGD
P 10,745.00
POST PERFORM SLACK MANAGEMENT
- REVERSE CIRCULATE
- CUT 220' COIL TUBING
-INSTALL CTO. PULL TEST TO 50K GOOD
TEST
- MAKE UP 4' STINGER / NOZZLE. PUMP
SLACK FORWARD
04:00 - 07:00
3.00 RIGD
P 10,745.00
POST BHIINSTALLUOC-
07:00 - 11:00
4.00 RIGD
P 10 745.00
POST LTT MASTER 8 SWAB VALVES WITH NEAT
METHANOL TO RD MPLAND NO BOPE
- GOOD TEST, RD MPL
- ND BOPE
- TEST TREE CAP WITH NEAT METHANOL
GOOD TEST, RIG RELEASED
Printed 3/11/2019 12:52:DOPM **All dephts reported in Drillers Dephts"
TWO = 0/0/0. Post CDR2 Tree conversion. RU CIW lubricator #68-840 with 6" CIW 'J'
TWC #408 and QTS. PT to 350/3500psi (PASS) Run down and set at 140". RD lubricator.
RD Target 90 #2. RD CDR2 Tree #5. Install 6" CIW Upper Tree Assy Serial #120420846-
01, with baker actuator. Torque to API specs. Torque MV x THA to API specs. RU CIW
lubricator 68-840 with 6"'J' pulling tool. PT to 350psi low and 5000psi high for 5 minutes
(PASS) Rundown and pull 6"'J' TWC 3408 at 135" RD lubricator and install tree cap. PT
to 500psi (PASS) RDMO ***Job Complete***SEE LOG FOR DETAILS Note: AOGCC
2/7/2019
Itesting required within 5 days of POP due to component change.
***WELL S/I UPON ARRIVAL***
RAN 3.79" CENT W/ 3.75" LIB TO TOP OF LINER @ 8,722' SLM (8,741' MD)(clean
impression of dep sleeve)
DRIFT W/ 2.25" CENT, 10'x 1-3/4" D.D. BAILER TO 8,800' SLM (no issues)
CURRENTLY STABBED ON W/ CALIPER, UNABLE TO STAB OFF DUE TO WINDS
2/8/2019
***CONT WSR ON 2/9/18***
T/1/0=0/0/8 Temp=S/I (LRS Unit 42 - Pressure test Liner Lap)
Pumped a total of 75 bbls down TBG in attempt to test Liner Lap and established a LLR of
2.9 bpm @ — 1300 psi. (Caught pressure @ 25 bbls away) See log for details. RDMO.
Hung info tag on V/SwabNW=Shut IA/OA=OTG.
2/8/2019
FWHP's=700/0/8
T/1/0=0/0/8 Temp=S/I (LRS Unit 42 - Assist Slickline: Liner Lap Test Post Liner Too
Packer
MIT -T to 2604 psi **PASSED** per SL WSL. Pumped 3.6 bbls of crude down TBG to reach
test pressure. 1st 15 min TBG lost 93 psi. 2nd 15 min TBG lost 42 psi, for a total loss of 135
psi in 30 min. Bled TBGP. Bled back— 3 bbls. RDMO.
SL in control of well upon LRS departure. Hung info tag on MV IA/OA=OTG.
2/9/2019
1FWHP's=0/0/8.
***CONT WSR FROM 2/8/19*** (ctd)
GOOD DATA ON PDS 24 ARM CALIPER
DRIFT TO TOL @ 8,741' MD W/ 45 KB PACKER DRIFT & PTSA STINGER (no issues)
SET 45KB PACKER W/ NS PTSA W/ 2.31 X -NIPPLE @ 8,729' MD, COE @ 8,730' MD
LRS PERFORMED PASSING MIT -T TO 2604psi
PULLED 2 7/8" XX -PLUG FROM PTSA @ 8,719' LM
DRIFTED W/ 10'x 2" DUMMY GUN (2.29" od rings) TO DOGLEG @ 9,394' SLM (34*
dogleg, see log for other issues)
2/9/2019
***CONT WSR ON 2/10/19***
***CONT WSR FROM 2/9/19*** (old)
RD SWCP 4516 SLICKLINE UNIT
2/10/2019
***WELL LEFT S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS***
CTU#8 1.75" CT Job Scope: Drift / CBL / Perforate
MI RU CTU. MU & RIH with Baker Milling bha & 2.29" 5-bld junk mill. Circulate well over 1%
Slick KCL w/ Safelube. Dry tag at 10700'. Flag coil at 10650'. Pooh. MU HES CBL and RIH.
Log up at 40 fpm from 10,669' to 9,000'. RIH to 10,669' for repeat pass.
2/18/2019
***Continued on 2/19/19***
Daily Report of Well Operations
03-12A
CTU#8 1.75" CT Job Scope: Drift / CBL / Perforate
Log repeat pass from 10,669' to 9,000' at 40 fpm with HES CBL. Pooh . Town analyzed
data and instructed to perforate as stated in the program. MU & RIH w/ 2.20" HES logging
carrier & 2.0" JSN. Tag 2-3/8" Liner Crossover at 10714'. Log from compression up to
8500'. Flag coil at 10660'. Pooh. Download good data, (zero correction). Tie into Baker
Hughes CoilTrack Log dated 31 -Jan- 2019. Trim 1 00'of pipe. MU & RIH w/ 2" x 30' HES
MaxForce perf gun #perforate from 10,670'- 10,700'. POOH. Confirm shots fired. Ball
recovered. RIH with Gun #2.
2/19/2019
1 ***Continued on 2/20/19 WSR***
CTU#8 1.75" CT Job Scope: Drift / CBL / Perforate
RIH w/ 2" x 30' HES MaxForce pert gun #2. Tag XO, correct depth. Perforate interval
10,640' - 10,670'. Pooh. MU & RIH w/ 2" x 30' HES MaxForce perf gun #3. Tag X , correct
depth. Perforate interval 10610'- 10640'. Pooh. Found thin spot in Coil at 6088'. Circulate
58 bbls of 60/40 methanol for freeze protect. Blow down reel w/ N2. Rig down. Go to SLB
yard for a pipe swap.
2/20/2019
***Job Incomplete***
CTU#8 1.75" CT Job Scope: Drift / CBL / Perforate
MIRU. Pump 1" drift ball. Test BOP's.
2/21/2019
***In Progress***
CTU#8 1.75" CT Job Scope: Drift / CBL / Perforate
MIRU. Pump 1" drift ball. Test BOP's.
2/21/2019
'**In Progress***
CTU#8 1.5" CT Job Scope: Drift / CBL / Perforate
Continue to test BOP's. MU BOT CTC/MHA. MU & RIH w/ 2" x 30' HES MaxForce pert gun
#4. Tag XO, correct depth. Perforate interval
2/22/2019
***Job In Progress***
CTU#8 15' CT Job Scope: Drift / CBL / Perforate
Continue to test BOP's. MU BOT CTC/MHA. MU & RIH w/ 2" x 30' HES MaxForce perf gun
#4. Tag XO, correct depth. Perforate interval 10,580'- 10,690'. Shots fired, ball recovered.
MU & RIH w/ 2" x 25' HES MaxForce pert gun #5. Tag XO and correct depth. Perforate
interval 10,555'- 10,580'. Injectivity test of 1.1 bpm @ 1962 psi. POOH. Shots fired, ball
recovered. MU & RIH w/ 2" x 25' HES MaxForce perf gun #5. Tag XO and correct depth.
Perforate interval 10,050'- 10,082'. POOH.
2/22/2019
**'Job In Progress'
CTU#8 1.5" CT Job Scope: Drift / CBL / Perforate / Contingent Acid
Continue to POOH. Shots fired, ball recovered. MU & RIH w/ 1.75" JSN. Circulate 3%
NH4CI around to surface. Pump 40bb19.2% HCL & 37bbl 11.9% HF acid treatment per
procedure. FP well. RDMO.
2/23/2019
***Complete***
T/1/0 = SSVNac/4. Temp = SI. Assist Ops w/ POI. IA FL @ near surface. OA cemented
to surface. Ops POI at 08:40 (PWI). Monitored WHPs and temp. Well appears stable at
16:20. Final WHPs = 1820/40/5.
2/24/2019
SV = C. WV, SSV, MV = O. IA, OA = OTG. 16:40
T/I/O = 1935/18/6. Temp = 1360. AOGCC MIT -IA PASSED to 2689 psi, Max Pressure =
2750 psi, Target Pressure = 2500 psi (reg compliance). State Witnessed by Lou
Laubenstein. IA FL @ surface. Used 4.9 bbls of DSL to pressure up IAP from 18 psi to
2750 psi. IA lost 49 psi in the 1st 15 min & 12 psi in the 2nd 15 min for a total loss of 61 psi
in 30 min. Bled IAP to 20 psi (3.4 bbls). Hung tags. Final WHPs = 1930/20/4.
2/27/2019
SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:00
0 by
North America - ALASKA - BP
PBU
03
03-12
03-12A
500292039201
Design: 03-12A
Final Survey Report
26 March, 2019
RECEIVED
MAR 2 6 2019
AOGCC
.•
Company:
North America - ALASKA - BP
Project:
PBU
Site:
03
Well:
03-12
Wellbore:
03-12A
Design:
03-12A
BP
Final Survey Report
Local Coordinate Reference:
Well 03-12
TVD Reference:
KB @ 64.00usft (13 :12 10/17/1979 00:00)
MD Reference:
KB @ 64.00usft (13 :12 10/17/1979 00:00)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project
PBU, PBU, PRUDHOE
Tie On Depth:
Map System:
Alaska NAD27 State Plane Zones
System Datum: Mean Sea Level
Gad Datum:
NAD27' OGP-Usa AK 14267'158641
Using Well Reference Point
Map Zone:
NAD27' OGP-Usa AK / Alaska zone 4 (26734.1586,
Using geodetic style factor
Site 03, TR -10-15
Site Position:
From: Map
Position Uncertainty: 0.00 Usti
Well 0312, 03-12
Well Position +N/ -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty 000 usft
Wellbore 03-12A
Magnetics Model Name
Design
Audit Notes:
Version:
Vertical Section:
BGGM2018
03-12A
Northing: 5,939,219.130 usft Latitude:
Easting: 712,287.910 usft Longitude:
Slot Radius: 0.000 in Grid Convergence:
Northing: 5,937,029.520 usft Latitude:
Easting: 714,158.000 usft Longitude:
Wellhead Elevation: 26.90 usft Ground Level:
Sample Date Declination Dip Angle Field Strength
(0) (°) (nT)
2/1/2019 17.11 60.92 57,429
Phase:
ACTUAL
Tie On Depth:
9,150.00
Depth From (TVD(
+NI -S
+EI -W
Direction
(usft(
(usft)
(usft)
1°I
24.70
0.00
0.00
80.59
70"14'13.210N
148° 17'8.774 W
1.61 °
70° 13'51,163 N
148' 16' 16,249 W
24.62 usft
3262019 9:21.:41AM Page 2 COMPASS 5000.1 Build BID
RE
BP
Final Survey Report
Company: North America - ALASKA- BP
Local Co-ordinate Reference:
Well 03-12
Project: PBU
TVD Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Site: 03
MD Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: 03-12A
Survey Calculation Method:
Minimum Curvature
Design: 03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program Date 2/6/2019
(°/100usft)
37.10
From To
0.00
37.10
(usft) (usft) Survey, (Wellbore)
Tool Name Description
0.00
50.00 9,150.00 Survey s2 (03-12)
GYD-GC-MS Gyrodata gyrocompassing m/s
0.00
9,16940 10,745.00 03-12A (03-12A)
MWD MWD -Standard
154.97
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Emoting
DLeg
Waft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
37.10
0.00
0.00
37.10
-26.90
0.00
0.00
5,937,029.520
714,158,000
0.00
50.00
0.06
154.97
50.00
-14.00
-0.01
0.00
5,937,029.514
714,158.003
0.47
75.00
0.09
149.69
75.00
11.00
-0.03
0.02
5,937,029.486
714,158.019
0.12
100.00
0.09
178.44
100.00
Woo
-0.07
0.03
5,937,029.449
714,158.031
0.18
125.00
0.17
188.91
125.00
81.00
-0.13
0.02
5,937,029.393
714,158.027
0.33
150.00
0.21
171.13
150.00
86.00
-0.21
0.02
5,937,029.311
714,158.031
0.28
175.00
0.17
182.18
175.00
111.00
-0.29
0.03
5,937,029,229
714,158.039
0.22
200.00
0.20
195.30
200.00
136.00
437
0.02
5,937,029.150
714,158.028
0.21
225.00
0.23
183.74
226.00
161.00
-0,46
0.00
5,937,029.057
714,158.016
0.21
250.00
0.26
191.28
250.00
186.00
-0.57
-0.01
5,937,028.951
714,158.005
0.18
275.00
0.30
185.28
275.00
211.00
-0.69
-0.03
5,937,028.830
714,157.991
0.20
300.00
0.22
178.45
300.00
236.00
-0.80
-0.03
5,937,028.716
714,157.989
0,34
325.00
0.23
195.21
325.00
261.00
-0.90
-0.05
5,937,028.620
714,157.980
0.27
350.00
0.30
192.27
350.00
286.00
-1.01
-0.07
5,937,028.507
714,157.956
0.29
375.00
0.27
178.38
375.00
311.00
-1.13
-0.08
5,937,028.384
714,157.948
0.30
400.00
0.25
185.15
400.00
336.00
-1.25
-0.09
5,937,028.270
714,157.948
0.15
425.00
0.30
183.17
425.00
361.00
-1.37
-0.10
5,937,028.150
714,157.943
0.20
450.00
0.28
185.85
450.00
386.00
-1.49
-0.11
5,937,028.024
714,157.936
0.10
475.00
0.31
188.84
475.00
411.00
-1.62
-0.12
5,937,027.896
714,157.923
0.13
500.00
0.32
173.13
500.00
436.00
-1.76
-0.12
5,937,027.760
714,157.925
0.35
525.00
0.37
174.58
525.00
461.00
-1.91
-0.11
5,937,027.611
714,157.945
0.20
V. Sec
(usft)
0.00
0.00
0.01
0.02
0.00
-0.01
-0.02
-0.04
-0.07
-0.10 _
-0.14
-0.16
-0.19
-0.24
-027
-0.29
-032
-0.35
-039
-0.41
042
3126/2019 9.21:41AM Page 3 COMPASS 5000.1 Build 81D
Survey
Well 03-12
KB @ 64.00usft (13: 12 10/17/1979 00:00)
KB @ 64.00usft (13: 12 10/17/1979 00:00)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD
Inc
BP
by
Final Survey Report
N/S
Company:
North Amenca- ALASKA -BP
Easting
Local Coordinate Reference:
Project:
PBU
(°)
TVD Reference:
Site:
03
MD Reference:
Well:
03-12
(usft)
North Reference:
Wellbore:
03-12A
550.00
Survey Calculation Method:
Design:
03-12A
550.00
Database:
Survey
Well 03-12
KB @ 64.00usft (13: 12 10/17/1979 00:00)
KB @ 64.00usft (13: 12 10/17/1979 00:00)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft)
(°)
(•)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(•/100usft)
550.00
0.41
174.17
550.00
486.00
-2.08
-0.09
5,937,027.442
714,152967
0.16
575.00
0.39
172.84
574.99
510.99
-2.25
-0.07
5,937,027.269
714,157.991
0.09
600.00
0.39
184.54
599.99
535.99
-2.42
-0.07
5,937,027.100
714,158.000
0.32
625.00
0.40
175.14
624.99
560.99
-2.59
-0.07
5,937,026.929
714,158.006
0.26
650.00
0.42
173.45
649.99
585.99
-2.77
-0.05
5,937,026.751
714,158.029
0.09
675.00
0.48
170.51
674.99
610.99
-2.96
-0.02
5,937,026.558
714,158.062
0.26
700.00
0.64
164.23
699.99
635.99
-3.20
0.03
5,937,026.322
714,158.124
0.68
725.00
0.65
165.83
724.99
660.99
-3.47
0.11
5,937,026.052
714,158.204
0.08
750.00
0.68
163.87
749.99
885.99
-3.75
0.18
5,937,025.774
714,158.288
0.15
775.00
0.62
163.31
774.99
710.99
-4.02
0.26
5,937,025.505
714,158.376
0.24
800.00
0.69
165.11
799.98
735.98
-4.30
0.34
5,937,025.232
714,158.461
0.29
825.00
0.72
163.97
824.96
760.98
-4.60
0.42
5,937,024.938
714,158.551
0.13
850.00
0.68
159.28
849.98
785.98
-4.89
0.52
5,937,024.651
714,158.855
0.28
875.00
0.70
156.30
874.98
610.98
-5.16
0.63
5,937,024.376
714,158.777
0.16
900.00
0.63
148.19
899.98
835.98
-5.42
0.76
5,937,024.123
714,158.918
0.47
925.00
0.66
142.80
924.98
860.98
-5.65
0.92
5,937,023.896
714,159.084
0.27
950.00
0.56
140.62
949.97
885.97
-5.86
1.09
5,937,023.692
714,159.255
0.41
975.00
0.65
143.44
974.97
910.97
-6.07
1.25
5,937,023.488
714,159.422
0.38
1,000.00
0.57
134.25
999.97
935.97
-6.27
1.42
5,937,023.293
714,159.602
0.50
1,025.00
0.54
144.32
1,024.97
960.97
-6.45
1.58
5,937,023.115
714,159.765
0.41
1,050.00
0.59
141.58
1,049.97
985.97
-6.65
1.73
5,937,022.922
714,159.919
0.23
1,075.00
0.52
145.24
1,074.97
1,010.97
-6.84
1.88
5,937,022.733
714,160.069
0.31
1,100.00
0.54
149.82
1,099.97
1,035.97
-7.04
2.00
5,937,022.541
714,160.198
0.19
1,125.00
0.53
154.09
1,124.97
1,060.97
-7.24
2.11
5,937,022.339
714,160-314
0.16
1,150.00
0.56
155.54
1,149.96
1,085.96
-7.46
2.21
5,937,022.126
714,160.421
0.13
1,175.00
0.55
160.27
1,174.96
1,110.96
-7.68
2.30
5,937,021.905
714,160.518
0.19
1,200.00
0.54
153.32
1,199.96
1,135.96
-7.90
2.39
5,937,021.689
714,160.818
0.27
V. Sec
(usft)
-0.43
-0.44
-0A6
-0.49
-0.50
-051
-049
-046
-043
-040
-0.37
-0.34
-0.29
-0.22
-0.13
-0.0'
0.12
0.24
0.38
0.51
0.62
0.73
0.82
0.90
0.96
1.01
1.07
3262019 9:21:41AM Page 4 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13 : 12 10/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft (13 :12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi
ND
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
1,225.00
0.56
153.46
1,224.96
1,160.96
-8.12
2.50
5,937,021.478
714,160.731
0.08
1,250.00
0.56
158.54
1,249.96
1,185.96
-8.34
2.60
5,937,021.258
714,160.837
0.20
1,275.00
0.51
154.10
1,274.96
1,210.96
-8.55
2.69
5,937,021.047
714,160.936
0.26
1,300.00
0.60
164.51
1,299.96
1,235.96
-8.78
2.78
5,937,020.823
714,161.026
0.54
1,325.00
0.60
157.91
1,324.96
1,260.96
-9.03
2.86
5,937,020.578
714,161.117
0.28
1,350.00
0.63
167.64
1,349.95
1,285.95
-9.28
2.94
5,937,020.325
714,161.203
0.43
1,375.00
0.61
164.30
1,374.95
1,310.95
-9.55
3.01
5,937,020.065
714,161.276
0.17
1,400.00
0.59
175.89
1,399.95
1,335.95
-9.80
3.05
5,937,019.809
714,161.329
0.49
1,425.00
0.62
179.88
1,424.95
1,360.95
-10.07
3.06
5,937,019.546
714,161.346
0.21
1,450.00
0.82
188.09
1,449.95
1,385.95
-10.33
3.04
5,937,019.277
714,161.335
0.36
1,475.00
0.53
191.74
1,474.95
1,410.95
-10.58
3.00
5,937,019.028
714,161.299
0.39
1,500.00
0.58
193.62
1,499.95
1,435.95
-10.82
2.95
5,937,018.791
714,161.252
0.21
1,525.00
0.63
190.10
1,524.95
1,460.95
-11.08
2.89
5,937;018.531
714,161.206
0.25
1,550.00
0.58
191.00
1,549.94
1,485.94
-11.34
2.84
5,937,018.270
714,161.165
0.20
1,575.00
0.62
192.67
1,574.94
1,510.94
-11.59
279
5,937,018.013
714,161.119
0.17
1,600.00
0.57
188.00
1,599.94
1,535.94
-11.85
2.74
5,937,017.756
714,161.079
0.28
1,625.00
0.61
194.83
1,624.94
1,560.94
-12.10
2.69
5,937,017.503
714,161.035
0.32
1,650.00
0.61
186.91
1,649.94
1,585.94
-12.36
2.64
5,937,017.241
714,160.992
0.34
1,675.00
0.61
196.07
1,674.94
1,610.94
-12.62
2.59
5,937,016.980
714,160.947
0.39
1,700.00
0.63
192.93
1,699.94
1,635.94
-12.88
2.52
5,937,016.716
714,160.886
0.16
1,725.00
0.59
192.61
1,724.93
1,660.93
-13.14
2.46
5,937,016.455
714,160.835
0.16
1,750.00
0.50
196.23
1,749.93
1,685.93
-13.37
2.40
5,937,016.223
714,160.783
0.39
1,775.00
0.51
204.73
1,774.93
1,710.93
-13.58
2.33
5,937,016.015
714,160.712
0.30
1,800.00
0.44
198.17
1,799.93
1,735.93
-13.77
2.25
5,937,015.821
714,160.641
0.35
1,825.00
0.42
209.55
1,824.93
1,760.93
-13.94
2.18
5,937,015.648
714,160.571
0.35
1,850.00
0.43
205.14
1,849.93
1,785.93
-14.10
2.09
5,937,015.481
714,160.490
0.14
1,875.00
0.37
203.21
1,874.93
1,810.93
-14.26
2.02
5,937,015.320
714,160.423
0.25
V. Sec
(usft)
1.14
1.20
1.26
1.31
1.35
1.38
1.41
1.41
1.37
.31
1.23
1.14
1.04
0.95
0.86
0.77 -
0.66
0.59
0.49
0.38
0.28
0.19
0.06
-0.03
-0.13
-0.24
-0.34
37262019 9:21:41AM Page 5 COMPASS 5000.1 Build 81D
NA
BP
Final Survey Report
Company:
North America- ALASKA - BP
Local Co-ordinate Reference:
Well 03-12
Project:
PBU
ND Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft (13: 1210/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
An
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
lust)
(usft)
(waft)
(usft)
(°/100usft)
1,900.00
0.31
200.07
1,699.93
1,835.93
-14.40
1.96
5,937,015.181
714,160.372
0.25
1,925.00
0.24
125.21
1,924.93
1,860.93
-14.50
1.98
5,937,015.088
714,160.394
1.36
1,950.00
0.46
83.11
1,949.93
1,885.93
-14.51
2.13
5,937,015.074
714,160.537
1.30
1,975.00
1.16
75.26
1,974.93
1,910.93
-14.44
2.47
5,937,015.160
714,160.879
2.83
2,000.00
1.66
71.46
1,999.92
1,935.92
-14.24
3.10
5,937,015.371
714,161.503
2.83
2,025.00
2.48
67.71
2,024.90
1,960.90
-13.91
3.98
5,937,015.730
714,162.378
2.54
2,050.00
3.31
65.93
2,049.87
1,985.87
-13.41
5.14
5,937,016.262
714,163.523
3.34
2,075.00
3.99
67.17
2,074.82
2,010.82
-12.78
5.50
5,937,016.935
714,164.965
2.74
2,100.00
4.82
69.23
2,099.74
2,035.74
-12.07
8.39
5,937,017.696
714,166.728
3.38
2,125.00
5.75
70.06
2,124.63
2,060.83
-11.27
10.55
5,937,018.556
714,168.863
3.73
2,150.00
6.69
69.13
2,149.49
2,085.49
-10.32
13.09
5,937,019.574
714,171.373
3.78
2,175.00
7.78
68.98
2,174.29
2,110.29
-9.20
16.03
5,937,020.782
714,174.280
4.36
2,200.00
9.13
69.08
2,199.02
2,135.02
-7.88
1946
5,937,022.194
714,177.674
5.40
2,225.00
10.24
68.95
2,223.66
2,159.86
-6.38
23.39
5,937,023.812
714,181.556
4.44
2,250.00
11.60
69.00
2,248.21
2,184.21
-4.68
27.81
5,937,025.635
714,185.926
5.44
2,275.00
13.03
69.76
2,272.63
2,208.63
-2.80
32.80
5,937,027.652
714,190.862
5.76
2,300.00
13.94
69.55
2,296.94
2,232.94
-0.77
38.26
5,937,029.833
714,198.268
3.65
2,325.00
15.48
69.57
2,321.12
2,257.12
1.44
44.21
5,937,032.218
714,202.150
6.16
2,350.00
16.88
69.81
2,345.13
2,281.13
3.86
50.74
5,937,034.820
714,208.612
5.61
2,375.00
17.94
69.47
2,368.98
2,304.98
6.46
57.76
5,937,037.621
714,215.548
4.26
2,400.00
18.61
69.34
2,392.72
2,328.72
9.22
65.10
5,937,040.586
714,222.804
2.68
2,425.00
18.74
69.12
2,416.41
2,352.41
12.06
72.58
5,937,043.636
714,230.205
0.59
2,450.00
18.98
69.15
2,440.06
2,376.06
14.94
80.13
5,937,046.727
714,237.671
0.96
2,475.00
19.05
69.19
2,463.70
2,399.70
17.84
87.74
5,937,049.838
714,245.199
0.28
2,500.00
19.25
69.35
2,487.32
2,423.32
20.74
95.41
5,937,052.958
714,252.783
0.83
2,525.00
19.30
69.00
2,510.92
2,446.92
23.67
103.13
5,937,056.109
714,260.410
0.50
2,550.00
19.19
69.10
2,534.52
2,470.52
26.62
110.82
5,937,059.273
714,268.018
0.46
V. Sec
(usft)
-042
-0.41
-0.28
0.08
0.73
1.66
2.88
4.43
6.30
8.56
11.22
14.31
17.91
22.03
26.67
31.9f
37.62
43.85
50.69
58.04
65.73
73.58
81.50
89.48
97 52
105.61
113.68
3262019 9: 21:4 YAM Page 6 COMPASS 5000.1 Build 81D
.., BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 03-12
Project: PBU
ND Reference:
KB @ 64.00usft (13
:12 10/17/1979 00:00)
Site: 03
MD Reference:
KB Q 64.00usft (13:
12 10/17/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: 03-12A
Survey Calculation Method:
Minimum Curvature
Design: 03-12A
Database:
EDM R5K - Alaska PROD - ANCPI
Survey
MD Inc
Azi
ND
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°Ito0usft)
(usft)
2,575.00
19.31
69.05
2,55812
2,494.12
29.56
118.52
5,937,062.434
714,275629
0.48
121.76
2,600.00
1920.
69.01
2,581.72
2,517.72
32.51
126.22
5,937,065.601
714,283.241
044
129.84
2,625.00
19.28
68.98
2,605.33
2,541.33
35.47
133.91
5,937,068.771
714,290.844
0.32
137.91
2,650.00
19.38
68.99
2,628.92
2,564.92
38.43
141.64
5,937,071.957
714,298.481
0.40
146.01
2,675.00
19.29
68.76
2,652.51
2,588.51
41.42
149.36
5,937,075.158
714,306.114
0.47
154.12
2,700.00
19.42
68.90
2,676.09
2,612.09
44.41
157.08
5,937,078.368
714,313.752
0.55
162.23
2,725.00
19.42
68.93
2,699.67
2,635.67
47.40
164.84
5,937,081.577
714,321.419
0.04
170.37
2,750.00
19.51
68.83
2,723.24
2,659.24
50.40
172.61
5,937,084.798
714,329.102
0.38
178.53
2,775.00
19.49
68.80
2,746.81
2,682.81
53.42
180.39
5,937,088.034
714,336.794
0.09
186.70
2,800.00
19.74
68.92
2,770.36
2,706.36
56.44
188.22
5,937,091.281
714,344.532
1.01
194.92
2,825.00
19.88
68.78
2,793.88
2,729.86
59.50
196.12
5,937,094.561
714,352.343
0.59
203.21
2,850.00
20.15
68.80
2,817.37
2,753.37
62.60
204,10
5,937,097.882
714,360.229
1.08
211.59
2,875.00
20.26
68.83
2,840.83
2,776.63
65.72
212.15
5,937,101.230
714,368.188
0.44
220.04
2,900.00
20.62
68.74
2,864.26
2,800.26
68.88
220.29
5,937,104.619
714,376.233
1.45
228.59
2,925.00
20.68
68.83
2,887.65
2,823.65
72.07
228.51
5,937,108.041
714,384.358
0.27
237.22
2,950.00
20.86
68.80
2,911.02
2,847.02
75.27
236.77
5,937,111.478
714,392.529
0.72
245.84 -
2,975.00
21.07
68.93
2,934.37
2,870.37
78.49
245.12
5,937,114.939
714,400.777
0.66
254.65
3,000.00
21.25
69.10
2,957.68
2,893.68
81.73
253.54
5,937,118.408
714,409.108
0.76
263.49
3,025.00
21.27
69.16
2,980.98
2,918.98
84.96
262.01
5,937,121.877
714,417.482
0.12
272.38
3,050.00
21.33
69.28
3,004.27
2,940.27
88.18
270.50
5,937,125.338
714,425.878
0.30
281.28
3,075.00
21.48
69.32
3,027.55
2,963.55
91.40
279.04
5,937,128.804
714,434.317
0.60
290.23
3,100.00
21.39
69.43
3,050.82
2,986.82
94.62
287.59
5,937,132.264
714,442.772
0.39
299.19
3,125.00
21.42
69.85
3,074.10
3,010.10
97.80
296.14
5,937,135.679
714,451.232
0.62
308.15
3,150.00
21.46
70.18
3,097.37
3,033.37
100.92
304.73
5,937,139.045
714,459.728
0.51
317.13
3,175.00
21.43
70.69
3,120.64
3,056.64
103.98
313.34
5,937,142.349
714,468.249
0.76
326.13
3,200.00
21.53
70.46
3,143.90
3,079.90
107.02
321.98
5,937,145.637
714,476.792
0.52
335.14
3,225.00
21.60
71.10
3,167.15
3,103.15
110.05
330.65
5,937,148.907
714,485.379
0.98
344.20
3262019 9:21 41AM
Page 7
COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North Amenca- ALASKA - BP
Local Co-ordinate Reference:
Well 03-12
Project:
Pau
ND Reference:
KB Q 64.00usft (13:12 10/17/1979 00:00)
Site:
03
MD Reference:
KB (r0 64.00usft (13: 12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
3250.00
2181
71.18
3,190.38
3,126.38
113.04
339.40
5,937,152.143
714,494.039
0.85
353.3,
3,275.00
21.91
71.27
3,213.58
3,149.58
116.03
348.22
5,937,155.388
714,502.764
0.42
362.50
3,300.00
22.09
71.35
3,236.76
3,172.76
119.03
357.09
5,937,158.639
714,511.546
0.73
371.74
3,325.00
22.20
71.46
3,259.92
3,195.92
122.04
366.02
5,937,161.896
714,520.388
0.47
381.05
3,350.00
22.29
71.69
3,283.05
3,219.05
125.03
375.00
5,937,165.141
714,529.278
0.50
390.39
3,375.00
22.39
71.72
3,306.18
3,242.18
128.01
384.02
5,937,168.379
714,538.212
0.40
399.78
3,400.00
22.30
71.76
3,329.30
3,265.30
130.99
393.05
5,937,171.612
714,547.149
0.37
409.17
3,425.00
22.28
72.00
3,352.43
3,288.43
133.94
402.06
5,937,174.815
714,556.073
0.37
418.55
3,450.00
22.35
71.94
3,375.56
3,311.56
136.88
411.08
5,937,178.008
714,565.012
0.29
427.93
3,475.00
22.25
72.07
3,398.69
3,334.69
139.81
420.11
5,937,181.194
714,573.947
0.45
437.31
3,500.00
22.28
72.08
3,421.83
3,357.83
142.72
429.12
5,937,184.364
714,582.873
0.12
446.68
3,525.00
22.20
72.21
3,444.97
3,380.97
145.63
438.13
5,937,187.519
714,591.793
0.38
456.04
3,550.00
22.15
72.33
3,488.12
3,404.12
146.50
447.11
5,937190.647
714,600.695
0.27
465,36
3,575.00
22.18
72.46
3,491.27
3,427.27
- 151.35
456.10
5,937,193.754
714,609.600
0.23
474.71
3,600.00
22.06
72.47
3,514.43
3,450.43
154.19
465.08
5,937,196.843
714,618.492
0.48
484.03
3,625.00
22.12
72.40
3,537.60
3,473.60
157.03
474.04
5,937,199.934
714,627.370
0.26
493.34
3,650.00
22.11
72.61
3,560.76
3,496.76
159.86
483.02
5,937,203.017
714,636.262
0.32
502.66
3,675.00
22.02
72.79
3,583.92
3,519.92
162.65
491.99
5,937,206.063
714,645.146
0.45
511.96
3,700.00
22.00
72.94
3,607.10
3,543.10
165.41
500.94
5,937,209.076
714,654.017
0.24
521.24
3,725.00
21.72
73.05
3,630.31
3,566.31
168.13
509.84
5,937,212.050
714,662.837
1.13
530.47
3,750.00
21.69
73.03
3,653.53
3,589.53
170.83
518.68
5,937,214.997
714,671.600
0.12
539.64
3,775.00
21.71
73.20
3,676.76
3,612.76
173.51
527.53
5,937,217.932
714,680.365
0.26
548.80
3,800.00
21.53
73.19
3,700.00
3,636.00
176.18
536.35
5,937,220.844
714,689.103
0.72
557.94
3,825.00
21.60
73.30
3,723.25
3,659.25
178.82
545.15
5,937,223.742
714,697.823
0.32
567.05
3,850.00
21.43
73.44
3,746.51
3,682.51
181.45
553.93
5,937,226.614
714,706,529
0.71
576.15
3,875.00
21.21
73.50
3,769.80
3,705.80
184.03
562.64
5,937,229.446
714,715.166
0.88
585.16
3,900.00
21.13
73.60
3,793.11
3,729.11
186.59
571.30
5,937,232.248
714,723.748
0.35
594.13
3262019 9.21:41AM
Page 8
COMPASS
5000.1 Build
81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13:
1210/17/1979 00:00)
Site'.
03
MD Reference:
KB @ 64.00usft (13
: 12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCPI
Survey
MD Inc
Art
TVD
TVDSS
NIS
EIW
Northing
Eas6ng
DLeg
V. Sec
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°It00usft)
(usft)
3,925.00
21.06
73.84
3,81644
3,752.44
189.11
579.94
5,937,235.014
714,732.310
044
6030F
3,950.00
21.04
73.81
3,839.77
3,775.77
191.62
588.56
5,937,237.759
714,740.859
0.09
611.98
3,975.00
21.02
73.86
3,863.10
3,799,10
194.11
597.18
5,937,240.500
714,749.401
0.11
620.88
4,000.00
21.07
74.08
3,886.44
3,822.44
196.59
605.81
5,937,243.223
714,757.955
0.37
629.80
4,025.00
21.10
73.90
3,909.76
3,845.76
199.07
614.45
5,937,245.948
714,766.525
0.29
638.74
4,050.00
20.99
74.06
3,933.09
3,869.09
201.55
623.08
5,937,248.670
714,775.080
0.50
647.65
4,075.00
21.07
74.00
3,956.43
3,892.43
204.02
631.71
5,937,251.382
714,783.631
0.33
656.57
4,100.00
20.91
73.88
3,979.77
3,915.77
206.50
640.31
5,937,254.102
714,792.163
0.66
665,46
4,125.00
20.81
73.60
4,003.13
3,939.13
208.99
648.86
5,937,256.836
714,800.634
0.56
674.30
4,150.00
20.82
73.79
4,026.50
3,962.50
211.48
657.39
5,937,259.571
714,809.086
0.27
683.12
4,175.00
20.74
73.74
4,049.87
3,965.87
213.96
665.90
5,937,262.292
714,817.528
0.33
691.93
4,200.00
20.73
73.79
4,073.25
4,009.25
216.44
674.40
5,937,265.006
714,825.952
0.08
700.72
4,225.00
20.87
73.71
4,096.63
4,032.63
218.92
682.92
.5,937,267.732
714,834.400
0.57
709.53
4,250.00
20.71
73.77
4,120.00
4,056.00
221.41
691.44
5,937,270.457
714,842.845
0.65
718.34
4,275.00
20.69
73.66
4,143.38
4,079.38
223.88
69992
5,937,273.175
714,851.253
0.17
727.11
4,300.00
20.55
73.79
4,166.78
4,102.78
226.35
708.38
5,937,275.881
714,859.630
0.59
735.85
4,325.00
20.59
73.81
4,190.19
4,126.19
228.80
716.81
5,937,278.570
714,867.992
0.16
744.58
4,350.00
20.58
74.17
4,213.59
4,149.59
231.23
725.26
5,937,281.233
714,876.368
0.51
753.31
4,375.00
20.66
74.09
4,236.99
4,172.99
233.63
733.73
5,937,283.860
714,884.765
0.34
762.06
4,400.00
20.78
74.08
4,260.37
4,196.37
236.06
742.23
5,937,286.546
714,893.198
0.48
770.84
4,425.00
20.75
74.09
4,283.75
4,219.75
238.49
750.76
5,937,289.217
714,901.649
0.12
779.65
4,450.00
20.82
73.83
4,307.12
4,243.12
240.94
759.28
5,937,291.909
714,910.101
0.46
788.46
4,475.00
20.66
74.07
4,330.50
4,266.50
243.39
767.79
5,937,294.597
714,918.536
0.72
797.26
4,500,00
20.60
74.19
4,353.90
4,289.90
245.80
776.27
5,937,297.246
714,926.936
0.29
806.01
4,525.00
20.67
74.22
4,377.30
4,313.30
248.20
784.74
5,937,299.883
714,935.342
0.28
814.77
4,550.00
20.52
74.27
4,400.70
4,336.70
250.58
793.21
5,937,302.510
714,943.734
0.60
823.51
4,575.00
20.48
74.31
4,424.11
4,360.11
252.95
801.63
5,937,305.119
714,952.091
0.17
832.21
3/26/2019
9.21:4IAM
Page 9
COMPASS 5000.1 Build BID
RE
BP
Final Survey Report
Company:
North America - ALASKA- BP
Local Coordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB Q 64.00usft (13 :12 10/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft (13 :12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
An
ND
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
4.60000
20.53
7449
4,44753
4,383.53
255.31
810.07
5,937,307.713
714,960.455
0.32
840.9'
4,625.00
20.61
74.58
4,470.94
4,406.94
257.65
818.53
5,937,310.294
714,968.851
0.34
849.65
4,650.00
20.71
74.30
4,494.33
4,430.33
260.02
827.03
5,937,312.900
714,977.277
0.56
858.42
4,675.00
20.67
74.57
4,517.72
4,453.72
262.39
835.54
5,937,315.511
714,985.715
0.41
867.20
4,700.00
20.66
74.70
4,541.11
4,477.11
264.72
844.05
5,937,318.089
714,994.152
0.19
875.98
4,725.00
20.58
74.88
4,564.51
4,500.51
267.03
852.54
5,937,320.639
715,002.578
0.41
684.73
4,750.00
20.52
74.73
4,587.92
4,523.92
269.33
861.01
5,937,323.179
715,010.978
0.32
893.47
4,775.00
20.57
75.01
4,611.33
4,547.33
271.62
869.48
5,937,325.708
715,019.378
0.44
902.20
4,800.00
20.39
75.10
4,634.74
4,570.74
273.88
877.93
5,937,328.203
715,027.762
0.73
910.90
4,825.00
20.59
74.85
4,658.16
4,594.16
276.15
886.39
5,937,330.711
715,036.145
0.87
919.61
4,850.00
20.47
75.09
4,681.58
4,617.58
278.42
894.85
5,937,333.224
715,044.544
0.59
928.34
4,875.00
20.42
75.27
4,705.00
4,641.00
280.66
903.29
5,937,335.696
715,052.919
0.32
937.03
4,900.00
20.58
75.18
4,728.42
4,664.42
282.89
911.76
5,937,338.168
715,061.318
0.65
945.75
4,925.00
20.54
75.13
4,751.83
4,687.83
285.14
820.25
5,937,340.657
715,069.737
0.17
954.49
4,950.00
20.55
75.12
4,775.24
4,711.24
287.39
928.73
5,937,343.149
715,078.148
0.04
963.22
4,975.00
20.54
75.11
4,798.64
4,734.64
289.64
937.21
5,937,345.643
715,086.560
0.04
971.9'
5,000.00
20.53
75.12
4,822.06
4,758.06
291.90
945.68
5,937,348.135
715,094.967
0.04
980.68
5,025.00
20.76
75.22
4,845.45
4,781.45
294.15
954.20
5,937,350.632
715,103.420
0.93
989.46
5,050.00
20.64
75.11
4,868.84
4,804.84
296.42
962.74
5,937,353.136
715,111.894
0.50
998.26
5,075.00
20.72
75.19
4,892.23
4,828.23
298.68
971.28
5,937,355.640
715,120.360
0.34
1,007.04
5,10000
20.79
75.06
4,915.60
4,851.60
300.95
979.84
5,937,358.157
715,128.854
0.34
1,015.86
5,12500
20.77
74.90
4,938.98
4,874.98
303.25
988.41
5,937,360.697
715,137.351
0.24
1,024.69
5,150.00
20.83
74.96
4,962.35
4,898.35
305.56
996.98
5,937,363.248
715,145.854
0.25
1,033.53
5,175.00
20.75
75.03
4,985.72
4,921.72
307.86
1,005.55
5,937,365.788
715,154.356
0.34
1,042.36
5,200.00
20.85
74.86
5,009.09
4,945.09
310.16
1,014.12
5,937,368.336
715,162.860
0.47
1,051.19
5,225.00
20.84
74.64
5,032.45
4,968.45
312.50
1,022.71
5,937,370.918
715,171.372
0.32
1,060.04
5,250.00
20.88
74.54
5,055.82
4,991.82
314.87
1,031.29
5,937,373.527
715,179.684
0.21
1,068.89
3/26/2019 9:21:41AM Page 10 COMPASS 5000.1 Build 81D
by
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 03-12
Project: PBU
TVD Reference:
KB Q 64.00usft (13
:12 10/17/1979 00:00)
Site: 03
MD Reference:
KB Q? 64.00usft (13:
12 10/17/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: 03-12A
Survey Calculation Method:
Minimum Curvature
Design: 03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
ND
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(9100usft)
(usft)
5,275.00
20.91
74.50
5,079.17
5,015.17
317.25
1,039.88
5,937,376,149
715,188.405
0.13
1,077.7(
5,300.00
20.79
74.08
5,102.53
5,038.53
319.66
1,048.45
5,937,378.801
715,196.898
0.77
1,086.61
5,325.00
20.86
73.88
5,125.90
5,061.90
322.11
1,056.99
5,937,381.495
715,205.368
0.40
1,095.43
5,350.00
20.89
73.79
5,149.26
5,085.26
324.59
1,065.55
5,937,384.217
715,213.849
0.18
1,104.28
5,375.00
20.82
73.70
5,172.62
5,108.62
327.08
1,074.09
5,937,386.949
715,222.319
0.31
1,113.12
5,400.00
20.93
73.38
5,195.98
5,131.98
329.61
1,082.63
5,937,389.715
715,230.787
0.63
1,121.96
5,425.00
20.84
73.03
5,219.34
5,155.34
332.18
1,091.17
5,937,392.531
715,239.242
0.62
1,130.80
5,450.00
21.01
73.14
5,242.69
5,178.69
334.78
1,099.71
5,937,395.370
715,247.707
0.70
1,139.65
5,47500
21.09
72.71
5,266.02
5,202.02
337.42
1,108.29
5,937,398.250
715,256.212
0.70
1,148.55
5,500.00
21.09
72.69
5,289.35
5,225.35
340.09
1,118.88
5,937,401.167
715,264.721
0.03
1,15746
5,525.00
21.24
72.71
5,312.66
5,248.66
342.77
1,125.50
5,937,404.095
715,273.259
0.60
1,166.40
5,550.00
21.17
72.69
5,335.97
5,271.97
345.46
1,134.13
5,937,407.028
715,281.812
0.28
1,175.36
5,575.00
21.37
72.99
5,359.27
5,295.27
348.14
1,142.80
5,937,409.948
715,290.397
0.91
1,184.34
5,600.00
21.71
72.53
5,382.52
5,318.52
350.86
1,151.56
5,937,412:917
715,299.082
1.52
1,193.44
5,625.00
21.69
72.39
5,40575
5,341.75
353.65
1,160.38
5,937,415.951
715,307.813
0.22
1,202.59
5,650.00
21.86
72.61
5,428.96
5,364.96
356.43
1,169.22
5,937,418.990
715,316.575
0.75
1,211.7%
5,675.00
21.92
72.29
5,452.16
5,388.16
359.25
1,178.11
5,937,422.052
715,325.378
0.53
1,221.00
5,700.00
22.07
72.28
5,475.34
5,411.34
362.09
1,187.03
5,937,425.153
715,334.212
0.60
1,230.26
5,725.00
22.22
72.44
5,498.50
5,434.50
364.95
1,196.01
5,937,428.262
715,343.108
0.65
1,239.59
5,750.00
22.21
72.74
5,521.64
5,457.64
367.78
1,205.03
5,937,431.345
715,352.042
0.46
1,248.95
5,775.00
22.16
73.51
5,544.79
5,480.79
370.52
1,214.06
5,937,434.340
715,360.994
1.18
1,258.31
5,800.00
21.56
75.72
5,567.99
5,503.99
372.99
1,223.03
5,937,437.065
715,369.892
4.07
1,267.56
5,825.00
20.69
78.70
5,591.31
5,527.31
374.99
1,231.82
5,937,439.312
715,378.614
5.53
1,276.55
5,850.00
20.23
81.46
5,614.74
5,550.74
376.50
1,240.42
5,937,441.063
715,387.173
4.27
1,285.29
5,875.00
19.98
84.38
5,638.21
5,574.21
377.56
1,248.95
5,937,442.365
715,395.665
4.14
1,293.87
5,900.00
19.90
87.37
5,661.72
5,597.72
378.17
1,257.45
5,937,443.220
715,404.144
4.09
1,302.36
5,925.00
20.03
90.34
5,685.22
5,621.22
378.34
1,265.98
5,937,443.632
715,412.668
4.09
1,310.81
3/26/2019 9:21:41AM
Page 11
COMPASS 5000.1 Build 81D
56M
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 03-12
Project: PBU
TVD Reference:
KB @j 64.00usft (13:
12 10/17/1979 00:00)
Site: 03
MD Reference:
KB @ 64.00usft (13
: 12 10/17/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: 03-12A
Survey Calculation
Methodr
Minimum Curvature
Design: 03-12A
Database:
EDM RSK -
Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
EIW
Northing
Fasting
DLeg
V. Sec
(usft) V)
(')
(usft)
jusft)
(usft)
(usft)
(usft)
(usft)
(°M00usft)
(usft)
5,950.00
20.23
93.27
5,708.69
5,644.69
378.07
1,274.58
5,937,443.604
715,421.268
4.11
1,319.21
5,975.00
20.55
95.99
5,732.12
5,668.12
377.36
1,283.26
5,937,443.146
715,429.964
4.00
1,327.69
6,000.00
20.74
98.60
5,755.52
5,691.52
376.24
1,292.00
5,937,442.275
715,438.732
3.76
1,336.13
6,025.00
21.11
101.32
5,778.87
5,714.87
374.70
1,300.79
5,937,440.980
715,447.564
4.16
1,344.55
6,050.00
21.31
103.78
5,802.18
5,738.18
372.73
1,309.62
5,937,439.265
715,456.442
3.65
1,352.94
6,075.00
21.44
106.22
5,825.46
5,761.46
370.37
1,318.41
5,937,437.158
715,465.305
3.59
1,361.23
1 6,100.00
21.68
107.29
5,848.71
5,784.71
367.72
1,327.21
5,937,434.760
715,474.172
184
1,369.48
6,125.00
21.67
108.00
5,871.94
5,807.94
364.93
1,338.01
5,937,432.212
715,483.047
1.05
1,377.70
6,150.00
21.72
108.49
5,895.17
5,831.17
362.03
1,344.79
5,937,429.570
715,491.902
0.75
1,365.89
6,175.00
21.67
108.33
5,918.40
5,854.40
359.11
1,353.56
5,937,426.901
715,500.749
0.31
1,39406
6,200.00
21.65
108.21
5,941.63
5,877.63
356.22
1,362.32
5,937,424.258
715,509.590
0.19
1,402.23
6,225.00
21.65
108.27
5,964.87
5,900.87
353.33
1,371.08
5,937,421.622
715,518.428
0.09
1,41040
6,250.00
21.59
108.08
5,988.11
5,924.11
350.46
1,379.83
5,937,418.998
715,527.257
0.37
1,418.56
6,275.00
21.56
108.13
6,011.36
5,947.36
347.60
1,388.57
5,937,416.391
715,536.072
0.14
1,426.72
6,300.00
21.54
108.21
6,034.61
5,970.61
344.74
1,397.29
5,937,413.776
715,544.874
0.14
1,434.86
6,325.00
21.61
108.10
6,057.86
5,993.86
341.88
1,406.03
5,937,411.161
715,553.687
0.32
1,443.0-
6,350.00
21.52
108.13
6,081.11
6,017.11
339.02
1,414.76
5,937,408.553
715,562.498
0.36
1,451.15
6,375.00
21.71
108.02
6,104.35
8,040.35
336.16
1,423.52
5,937,405.946
715,571.330
0.78
1,459.32
6,400.00
21.50
108.16
6,127.60
6,063.60
333.30
1,432.27
5,937,403.337
715,580.157
0.88
1,467.49
6,425.00
21.51
107.93
6,150.86
6,088.86
330.46
1,440.98
5,937,400.747
715,588.947
0.34
1,475.62
6,450.00
21.44
108.20
6,174.12
6,110.12
327.63
1,449.68
5,937,398.157
715,597.725
0.48
1,48374
6,475.00
21.24
108.11
6,197.41
6,133.41
324.79
1,458.33
5,937,395.569
715,606.446
0.81
1,491.81
6,500.00
21.39
108.47
6,220.70
6,156.70
321.94
1,466.95
5,937,392.964
715,615.152
0.80
1,499.85
6,525.00
21.29
108.60
6,243.98
6,179.98
319.05
1,475.58
5,937,390.318
715,623.856
0.44
1,507.89
6,550.00
21.20
108.44
6,267.28
6,203.28
316.17
1,484.17
5,937,387.686
715,632.523
0.43
1,515.89
6,575.00
21.20
108.23
6,290.59
6,226.59
313.33
1,492.75
5,937,385.087
715,641.182
0.30
1,523.89
j, 6,600.00
21.10
108.32
6,313.91
6,249.91
310.50
1,501.32
5,937,382.503
715,649.823
0.42
1,531.881
31262019 9:21:41AM
Page 12
COMPASS 5000.1 Build 81D
an
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
We1103-12
Project: PBU
TVD Reference:
KB @ 64.00usft (13:
12 10/17/1979 00:00)
Site: 03
MD Reference:
KB @ 64.00usft (13:
1210/17/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: 03-12A
Survey Calculation Method:
Minimum Curvature
Design: 03-12A
Database:
EDM R5K -
Alaska PROD - ANCP1
Survey
MD Inc
Azi
ND
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft) V)
(')
(usft)
(usft)
(usft)
(usft)
(waft)
(usft)
(°It00usft)
(usft)
6,625.00
21.18
108.24
6,337.22
6,273.22
307.67
1,509.88
5,937,379.919
715,658.461
0.34
1,539.8E
6,65000
21.04
108.19
6,360.55
6,296.55
304.86
1,518.43
5,937,377.349
715,667.090
0.56
1,547.84
6,675.00
21.00
108.19
6,383.88
6,319.88
302.06
1,526.95
5,937,374.792
715,675.685
0.16
1,555.79
6,700.00
21.07
108.22
6,407.22
6,343.22
299.25
1,535.47
5,937,372.232
715,684.285
0.28
1,56374
6,725.00
20.98
108.38
6,430.55
6,366.55
296.44
1,543.99
5,937,369.659
715,692.877
0.43
1,571.66
6,750.00
20.96
108.32
6,453.90
6,389.90
293.62
1,552.48
5,937,367.085
715,701.445
0.12
1,579.60
6,775.00
20.87
108.20
6,477.25
6,413.25
290.82
1,560.96
5,937,364.530
715,709.996
0.40
1,587.50
6,800.00
20.85
108.19
6,500.61
8,436.61
288.04
1,569.41
5,937,361.992
715,718.528
0.08
1,595.39
6,825.00
20.96
108.46
6,523.97
6,459.97
285.24
1,577.88
5,937,359.429
715,727.072
0.58
1,603.29
6,850.00
20.77
108.26
6,547.33
6,483.33
282.43
1,586.33
5,937,356.865
715,735.598
0.81
1,611.16
8,875.00
20.62
108.18
6,570.71
6,506.71
279.67
1,594.72
5,937,354.342
715,744.065
0.61
1,618.99
6,900.00
20.59
107.94
6,594.11
6,530.11
276.94
1,603.09
5,937,351.854
715,752.503
0.36
1,62680
6,925.00
20.55
107.86
6,617.52
6,553.52
27424
1,611.45
5,937,349.392
715,760.935
0.20
1,634.60
6,950.00
20.82
107.81
6,640.92
6,576.92
271.55
1,619.82
5,937,346.939
715,769.375
0.29
1,64242
6,975.00
20.48
107.89
6,664.33
6,600.33
268.88
1,628.17
5,937,344.487
715,777.800
0.57
1,650.22
7,000.00
20.52
107.96
6,687.75
6,623.75
266.17
1,636.50
5,937,342.031
715,786.203
0.19
1,657.91
7,025.00
20.65
107.63
6,711.15
6,647.15
263.48
1,644.87
5,937,339.583
715,794.845
0.70
1,665.81
7,050.00
20.44
107.37
6,734.56
6,670.56
260.84
1,653.24
5,937,337.184
715,803.084
0.92
1,67364
7,075.00
20.46
107.43
6,757.99
6,693.99
258.23
1,661.57
5,937,334.809
715,811.489
0.12
1,68143
7,100.00
20.36
107.43
6,781.42
6,717.42
255.82
1,669.89
5,937,332.435
715,819.878
0.40
1,68921
7,125.00
20.38
107.29
6,804.85
6,740.85
253.02
1,678.19
5,937,330.076
715,828.253
0.21
1,69698
7,150.00
20.38
107.01
6,828.29
6,764.29
250.46
1,686.51
5,937,327.746
715,836.641
0.39
1,70477
7,175.00
20.31
107.06
6,851.73
6,787.73
247.91
1,694.82
5,937,325.437
715,845.021
0.29
1,712.55
7,200.00
20.48
107.46
6,875.16
6,611.16
245.32
1,703.14
5,937,323.089
715,853.410
0.88
1,720.33
7,225.00
20.41
107.46
6,898.59
6,834.59
242.70
1,711.47
5,937,320.706
715,861.811
0.28
1,728.12
7,250.00
20.30
106.99
6,922.03
6,858.03
240.13
1,719.78
5,937,318.368
715,870.186
0.79
1,73590
7,275.00
20.20
106.88
6,945.48
6,881.48
237.61
1,728.06
5,937,316.084
715,878.532
0.43
1,74365
326/2019 9:21:41AM
Page 13
COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company: North America - ALASKA- BP
Local Coordinate
Reference:
Well 03-12
Project: PBU
TVD Reference:
KB @ 64.00usft (13
:12 10/17/1979 00:00)
Site: 03
MD Reference:
KB @ 64.00usft (13
:12 10/17/1979 00:00)
Well: 03-12
North Reference:
Tme
Wellbore: 03-12A
Survey Calculation Method;
Minimum Curvature
Design: 03-12A
Database:
EDM RSK - Alaska PROD - ANCP1
Sumey
MD Inc
Azi
TVD
TVDSS
WS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
7,300.00
2007.
106.98
6,968.95
6,904.95
235.10
1,736.29
5,937,313.813
715,886.832
0.54
1,751.3f
7,325.00
20.07
106.94
6,992.44
6,928.44
232.60
1,744.50
5,937,311.544
715,895.105
0.05
1,759.05
7,350.00
19.99
106.72
7,015.92
6,951.92
230.12
1,752.69
5,937,309.299
715,903.368
0.44
1,766.73
7,375.00
19.90
106.87
7,039.42
6,975.42
227.66
1,760.86
5,937,307.068
715,911.599
0.41
1,774.38
7,400.00
19.85
108.86
7,062.93
6,998.93
225.19
1,768.99
5,937,304.834
715,919.799
0.20
1,782.00
7,425.00
19.80
106.57
7,086.45
7,022.45
222.75
1,777.11
5,937,302.627
715,927.985
0.44
1,789.61
7,450.00
19.75
106.57
7,109.98
7,045.98
220.34
1,785.22
5,937,300.446
715,936.156
0.20
1,797.22
7,475.00
19.57
106.76
7,133.52
7,069.52
217.93
1,793.28
5,937,298.264
715,944.279
0.76
1,804.77
7,500.00
19.46
108.56
7,157.09
7,093.09
215.53
1,801.28
5,937,296.098
715,952.344
0.51
1,812.27
7,525.00
19.54
106.28
7,180.65
7,116.65
213.18
1,809.28
5,937,293.967
715,960.412
0.49
1,819.79
7,550.00
19.32
106.66
7,204.23
7,140.23
210.82
1,817.26
5,937,291.837
715,968.451
1.01
1,827.27
7,575.00
19.49
106.49
7,227.81
7,163.81
208.45
1,825.22
5,937,289.695
715,976.475
0.72
1,834.73
7,600.00
19.32
106.42
7,251.39
7,187.39
206.10
1,833.18
5,937,287.569
715,984.504
0.69
1,842.21
7,625.00
19.16
106.00
7,274.99
7,210.99
203.80
1,841.09
5,937,285495
715,992.477
0.85
1,849.64
7,650.00
19.16
106.21
7,298.61
7,234.61
201.52
1,848.98
5,937,283444
716,000.421
0.28
1,857.04
7,675.00
18.89
106.33
7,322.24
7,258.24
199.24
1,856.80
5,937,281.384
716,006.305
1.09
1,864.3f
7,700.00
18.90
106.31
7,345.89
7,281.89
196.96
1,864.57
5,937,279.330
716,016.136
0.05
1,871.68
7,725.00
18.78
105.91
7,369.55
7,305.55
194.72
1,872.33
5,937,277.311
716,023.952
0.71
1,878.96
7,750.00
18.61
106.18
7,393.24
7,329.24
192.51
1,880.03
5,937,275.316
716,031.713
0.76
1,886.20
7,775.00
18.54
106.92
7,416.93
7,352.93
190.24
1,887.66
5,937,273.266
716,039.407
0.98
1,893.36
7,800.00
18.23
106.60
7,440.66
7,376.66
187.96
1,895.21
5,937,271.207
716,047.018
1.30
1,900.44
7,825.00
18.13
106.06
7,464.41
7,400.41
185.77
1,902.70
5,937,269.227
716,054.563
0.78
1,907.46
7,850.00
18.05
106.12
7,488.17
7,424.17
183.62
1,910.15
5,937,267.289
716,062.079
0.33
1,914.47
7,875.00
18.00
106.44
7,511.95
7,447.95
181.45
1,917.58
5,937,265.332
716,069.563
0.44
1,921.44
7,900.00
18.15
106.61
7,535.71
7,471.71
179.24
1,925.02
5,937,263.338
716,077.058
0.64
1,928.41
7,925.00
18.01
107.01
7,559.48
7,495.48
177.00
1,932.44
5,937,261.306
716,084.546
0.75
1,935.38
7,950.00
18.04
106.15
7,583.25
7,519.25
174.79
1,939.86
5,937,259.310
716,092.019
1.07
1,942.33
326/2019 9:21:41AM
Page 14
COMPASS 5000.1 Build 81D
1...6/ by
BP
Final Survey Report
Company:
North America, - ALASKA - BP
Local Co-ordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCPI
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/Vd
Northing
716,167.960
Easting
1.54
DLeg
V. Sac
(usft)
(•)
(°)
(usft)
(usft)
lust)
(usft)
(usft)
716,195.139
(usft)
1.53
(•/100usft)
(usft)
7,975.00
18.07
106.78
7607.02
7,543.02
172.60
1,947.29
5,937,257326
716,202.194
716,099.508
1.48
0.79
1,949.317
8,000.00
18.02
106.76
7,630.79
7,566.79
170.36
1,954.70
5,937,255.303
716,209.227
716,106.983
1.14
0.20
1,956.25
8,025.00
18.20
106.56
7,654.55
7,590.55
168.14
1,962.15
5,937,253.288
716,216.227
716,114.468
1.76
0.76
1,963.23
8,050.00
17.94
107.10
7,678.32
7,614.32
165.69
1,969.57
5,937,251.255
716,223.211
716,121.971
1.09
1.24
1,970.18
8,075.00
17.98
107.87
7,702.10
7,638.10
163.57
1,976.92
5,937,249.148
716,230.134
716,129.386
2.34
0.96
1,977.06
8,100.00
17.87
106.92
7,725.89
7,661.89
161.27
1,984.26
5,937,247.057
716,236.918
716,136.790
1.02
1.25
1,983.93
8,125.00
17.82
106.94
7,749.68
7,685.68
159.04
1,991.59
5,937,245.036
716,243.772
716,144.179
1.89
0.20
1,990.79
8,150.00
17.86
108.23
7,773.48
7,709.48
156.73
1,998.89
5,937,242.930
716,250.601
716,151.542
3.00
1.59
1,997.62
6,175.00
17.74
107.37
7,797.29
7,733.29
154.39
2,006.17
5,937,240.801
716,257.164
716,158.881
3.30
1.16
2,004.41
8,200.00
17.86
107.07
7,821.09
7,757.09
152.13
2,013.47
5,937,238.747
716,263.672
716,166.242
2.06
0.60
2,011.24
8,225.00
17.53
108.65
7,844.91
7,780.91
149.80
2,020.70
5,937,236.624
716,270.282
716,173.537
2.09
2.33
2,018.00
8,250.00
17.50
108.34
7,868.75
7,80475
147.41
2,027.84
5,937,234.441
716,276.714
716,180.737
3.56
0.39
2,024.65
8,275.00
17.50
107.06
7,892.59
7828.59
145.13
2,035.00
5,937,232.360
716,167.960
1.54
2,031.34
6,300.00
17.25
108.03
7,916.45
7,85245
142.88
2,042.12
5,937,230.313
716,195.139
1.53
2,037.99
8,325.00
17.07
109.13
7,940.34
7876.34
140.53
2,049.11
5,937,228.163
716,202.194
1.48
2,044.51
8,350.00
17.16
108.21
7,964.23
7,900.23
138.17
2,056.08
5,937,226.007
716,209.227
1.14
2,051
or
8,375.00
16.76
107.58
7,988.14
7,924.14
135.93
2,063.02
5,937,223.964
716,216.227
1.76
2,05748
8,400.00
17.03
107.68
8,012.06
7,948.06
133.73
2,069.94
5,937,221.961
716,223.211
1.09
2,063.95
8,425.00
16.58
108.97
8,036.00
7,972.00
131.46
2,076.80
5,937,219.885
716,230.134
2.34
2,070.35
8,450.00
16.54
109.85
8,059.96
7,995.96
129.09
2,083.52
5,937,217.709
716,236.918
1.02
2,076.59
8,475.00
16.92
108.88
8,083.90
8,019.90
126.71
2,090.31
5,937,215.517
716,243.772
1.89
2,082.90
8,500.00
16.23
107.85
8,107.86
8,043.86
124.46
2,097.08
5,937,213.462
716,250.601
3.00
2,089.20
8,525.00
15.71
110.18
8,131.90
8,067.90
122.22
2,103.58
5,937,211.410
716,257.164
3.30
2,095.25
8,550.00
16.21
110.61
8,155.93
8,091.93
119.82
2,110.03
5,937,209.198
716,263.672
2.06
2,101.22
8,575.00
16.09
108.78
8,179.95
8,115.95
117.48
2,116.57
5,937,207.041
716,270.282
2.09
2,107.29
8,600.00
15.25
109.88
8,204.02
8,140.02
115.25
2,122.94
5,937,204.989
716,276.714
3.56
2,113.21
8,625.00
15.42
111.23
8,228.13
6,164.13
112.93
2,129.13
5,937,202.845
716,282.967
1.58
2,118.94
326/2019 9:21:41AM Page 15 COMPASS 5000.1 Build BID
BP
Final Survey Report
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13 : 1210/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft It : 12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
NDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usR) (°)
V)
lush)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
8650.00
15.26
111.66
8,252.24
8,188.24
110.51
2,135.29
5,937,200.603
716,289.189
0.79
2,124.6:
8,675.00
14.95
111.91
8,276.37
8,212.37
108.09
2,141.34
5,937,198.358
716,295.304
1.27
2,130.19
8,700.00
15.23
112.21
8,300.51
8,236.51
105.65
2,147.37
5,937,196.086
716,301.403
1.16
2,135.74
8,725.00
15.19
113.28
8,324.64
8,260.64
103.11
2,153.42
5,837,193.723
716,307.521
1.13
2,141.29
8,750.00
15.14
113.69
8,348.76
8,284.76
100.50
2,159.42
5,937,191.288
716,313.590
0.47
2,146.79
8,775.00
15.14
114.50
8,372.90
8,308.90
97.84
2,165.38
5,937,188.793
716,319.624
0.85
2,152.23
8,800.00
14.95
115.47
8,397.04
8,333.04
95.10
2,171.26
5,937,186.221
716,325.581
1.26
2,157.59
8,825.00
14.95
115.85
8,421.19
8,357.19
92.31
2,177.07
5,937,183.594
716,331.471
0.38
2,162.86
8,850.00
14.91
116.51
8,445.35
8,381.35
89.46
2,182.85
5,937,180.918
716,337.329
0.70
2,168.10
8,875.00
15.23
117.37
8,469.49
8,405.49
86.52
2,188.65
5,937,178.138
716,343.204
1.56
2,173.34
8,900.00
15.14
117.81
8,493.62
8,429.62
83.49
2,194.45
5,937,175.272
716,349.082
0.58
2,178.57
8,925.00
15.30
118.27
8,517.74
8,453.74
80.40
2,200.24
5,937,172.352
716,354.969
0.80
2,183.78
8,950.00
15.35
118.81
8,541.85
8,477.85
77.24
2,206.05
5,937,169.362
716,360.861
0.60
2,188.99
8,875.00
15.58
119.23
8,565.95
8,501.85
74.01
2,211.88
5,937,166.295
716,366.779
1.02
2,194.21
9,000.00
15.24
120.83
8,590.05
8,526.05
70.69
2,217.63
5,937,163.136
716,372.622
2.18
2,198.34
9,025.00
15.48
121.20
8,614.15
8,550.15
67.27
2,223.30
5,937,159.887
716,378.392
1.04
2,204.31 1
9,050.00
15.55
121.95
8,638.24
8,574.24
63.77
2,229.00
5,937,156.548
716,384.186
0.85
2,209.43
9,075.00
15.72
122.45
8,662.32
8,598.32
60.18
2,234.70
5,937,153.121
716,389.986
0.87
2,214.46
9,100.00
15.91
123.13
8,686.37
8,622.37
56.49
2,240.43
5,937,149.596
716,395.816
1.06
2,219.51
9,125.00
15.95
123.68
8,710.41
8,646.41
52.71
2,246.16
5,937,145.982
716,401.648
0.62
2,224.54
9,150.00
15.96
123.60
8,734.45
8,670.45
48.91
2,251.88
5,937,142.340
716,407.475
0.10
2,229.57
Tie-in to Parent Well 03-12
9,169.40
16.05
123.56
8,753.10
8,689.10
45.95
2,256.34
5,937,139.509
716,412.013
0.47
2,23348
KOP - Top of Whipstock
9,194.13
12.21
148.35
8,777.10
8,713.10
41.83
2,260.56
5,937,135.509
716,416.355
28.64
2,236.97
Interpolated Azimuth
-
9,223S9
10.18
187.38
8,806.43
8,742.43
36.51
2,261.88
5,937,130.236
716,417.825
25.72
2,23741
Interpolated Azimuth
3/262019 9:21:41AM
Page 16
COMPASS
5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
Site:
03
MD Reference:
KB @ 64.00usft (13 : 12 10/17/1979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
EW
Northing
Fasting
DLeg
V. Sec
(usft) (1)
0
(usR)
(usft)
(usR)
(usft)
(usR)
(usR)
(°MOOuslit)
(usft)
9,254.30
18.35
214.50
8,835.81
8,771.81
29.91
2,258.83
5,937,123.546
716,414.959
34.14
2,233.3'
Interpolated Azimuth
9,269.48
21.07
222.63
8,850.10
8,786.10
25.93
2,255.62
5,937,119.479
716,411.871
25.40
2,229.50
First Good Survey
9,299.41
22.93
248.65
8,877.92
8,813.92
19.83
2,246.53
5,937,113.127
716,402.952
32.89
2,219.53
9,329.39
29.13
266.95
8,904.88
8,840.88
17.31
2,233.77
5,937,110.245
716,390.270
33.63
2,206.53
9,365.85
41.70
273.55
8,934.55
8,870.55
17.59
2,212.71
5,937,109.927
716,369.214
35.99
2,185.80
9,397.15
5203.
276.87
8,955.92
8,891.92
19.72
2,190.01
5,937,111.408
716,346.459
33.89
2,16375
9,430.26
63.98
282.00
8,973.44
8,909.44
24.39
2,162.38
5,937,115.295
716,318.717
38.39
2,137.27
9,460.56
73.99
287.29
8,984.30
8,920.30
31.57
2,135.08
5,937,121.698
716,291.217
36.82
2,111.50
9,491.94
73.09
300.60
8,993.23
8,929.23
43.75
2,107.64
5,937,133.088
716,263.449
40.77
2,086.43
9,518.03
70.89
312.18
9,001.32
8,937.32
58.43
2,087.70
5,937,147.192
716,243.100
43.03
2,069.15
9,550.30
88.70
323.55
9,012.50
8,948.50
80.82
2,067.41
5,937,169.003
716,222.183
33.75
2,052.80
9,580.03
68.76
330.84
9,023.30
8,959.30
104.09
2,052.41
5,937,191.833
716,208.533
22.85
2,041.81
9,610.28
67.85
336.38
9,034.49
8,970.49
129.25
2,039.92
5,937,218.631
716,193.333
17.28
2,033.60
9,642.52
68.16
342.25
9,046.57
8,982.57
157.20
2,029.37
5,937,244.270
716,181.993
16.91
2,027.76 '
9,670.51
69.25
345.50
9,056.74
8,992.74
182.25
2,022.13
5,937,269.102
716,174.046
11.50
2,024.72
9,700.56
69.36
345.58
9,067.36
9,003.36
209.47
2,015.11
5,937,296.111
716,166.257
0.44
2,022.24
9,730.66
71.86
349.19
9,077.40
9,013.40
237.16
2,008.92
5,937,323.607
716,159.284
13.65
2,020.66
9,760.68
78.50
353.90
9,085.13
9,021.13
265.83
2,004.68
5,937,352.143
716,154.230
27.36
2,021.171
9,790.43
82.62
0.24
9,090.01
9,026.01
295.11
2,003.19
5,937,381.375
716,151.910
25.17
2,024.491
9,822.83
84.78
3.83
9,093.57
9,029.57
327.29
2,004.34
5,937,413.569
716,152.141
12.87
2,030.881
9,850.50
90.34
5.35
9,094.75
9,030.75
354.84
2,006.55
5,937,441.164
716,153.570
20.83
2,037.561
9,884.15
98.53
8.10
9,092.15
9,028.15
388.12
2,010.47
5,937,474.548
716,156.544
25.66
2,046.881
9,910.23
103.86
11.58
9,087.08
9,023.08
413.32
2,014.83
5,937,499.856
716,160.189
24.27
2,055.30
9,940.51
106.84
17.36
9,079.06
9,015.06
441.58
2,022.11
5,937,528.309
716,166.666
20.87
2,067.10
9,969,96
111.03
19.45
9,069.51
9,005.51
468.00
2,030.90
5,937,554.972
716,174.698
15.73
2,08009
3262019 9:21:4IAM
Page 17
COMPASS
5000.1 Build BID
RE
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Wall 03-12
Project:
PBU
TVD Reference:
KB @ 64.00usft (13 :12 10/1711979 00:00)
Site:
03
MD Reference:
KB Q 64.00usft (13 :12 1 0/1 711 979 00:00)
Well:
03-12
North Reference:
True
Wellbore:
03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Eas0ng
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(uaft)
(usft)
(°1100usft)
(usft)
10,000.41
116.07
1926.
9,057.35
8,993.35
494.33
2,040.15
5,937,581.551
716,183.195
16.56
2,093.5:
10,030.43
117.28
27.24
9,043.85
8,979.85
518.95
2,050.72
5,937,606.461
716,193.059
24.09
2,107.97
10,081.49
117.00
33.49
9,029.67
8,965.67
542.78
2,064.68
5,937,630.678
716,206.340
17.93
2,125.65
10,090.13
117.69
40.08
9,016.51
8,952.51
563.14
2,079.90
5,937,651.462
716,220.973
20.58
2,143.99
10,120.49
117.84
46.81
9,002.35
8,938.35
582.63
2,096.36
5,937,671.466
716,238.869
19.62
2,165.39
10,150.60
118.33
54.21
8,988.16
8,924.16
599.51
2,118.84
5,937,688.920
716,258.858
21.74
2,188.35
10,179.10
118.14
61.02
6,974.66
8,910.66
612.95
2,140.02
5,937,702.951
716,279.654
21.06
2,211.45
10,212.11
118.38
71.16
8,959.00
8,895.00
624.71
2,168.55
5,937,715.463
716,305.837
27.08
2,239.54
10,23(1.07
118.73
76.35
8,946.59
8,882.59
631.09
2,188.43
5,937,722.459
716,327.526
17.61
2,262.17
10,270.55
118.89
86.08
8,930.91
8,866.91
635.43
2,216.51
5,937,727.595
716,355.466
26.25
2,290.58
10,302.22
118.86
94.87
8,915.59
8,851.59
635.20
2,244.20
5,937,728.151
716,383.152
24.30
2,317.86
10,329.84
118.41
103.21
8,902.34
8,838.34
631.39
2,268.11
5,937,725.024
716,407.158
26.55
2,340.82
10,359.43
118.13
110.09
8,888.31
8,824.31
623.93
2,293.05
5,937,718.273
716,432.305
20.50
2,364.21
10,390.45
117.30
118.25
8,873.86
8,809.86
612.69
2,318.07
5,937,707752
716,457.633
23.44
2,387.06
10,419.06
117.75
125.56
8,860.63
8,796.63
599.30
2,339.59
5,937,694.972
716,479.520
22.77
2,406.10
10,450.18
117.87
133.10
8,846.09
8,782.09
581.87
2,360.86
5,937,678.153
716,501.272
21.37
2,4242-
10,480.26
118.35
139.97
8,831.90
8,767.90
562.63
2,379.10
5,937,659.442
716,520.049
20.21
2,439.07
10,510.83
118.24
144.59
8,817.41
8,753.41
541.35
2,395.56
5,937,638.635
716,537.107
13.31
2,451.83
10,540.56
118.80
138.30
8,803.20
8,739.20
520.93
2,411.82
5,937,618.691
716,553.945
18.68
2,464.54
10,569.24
117.48
134.18
8,789.67
8,725.87
502.67
2,429.31
5,937,600.940
716,571.945
13.48
2,478.81
10,601.10
117.40
128.41
8,774.98
8,710.98
484.03
2,450.54
5,937,582.903
716,593.697
16.07
2,496.71
10,630.20
118.00
124.47
8,761.45
8,697.45
468.72
2,471.26
5,937,568.197
716,614.842
12.16
2,514.65
10,659.53
117.78
118.77
8,747.72
8,683.72
455.14
2,493.33
5,937,555.247
716,637.280
17.19
2,534.19
10,693.65
118.01
113.79
8,731.75
8,667.75
441.80
2,520.35
5,937,542.674
716,664.673
12.92
2,558.67
10,707.57
117.86
111.83
8,725.23
8,661.23
437.03
2,531.69
5,937,538.230
716,676.138
12.49
2,569.07
10,745.00
117.86
111.83
8,707.74
8,643.74
424.72
2,562.41
5,937,526.803
716,707.192
0.00
2,597.37
Projection to TD
326/2019 9:21:41AM
Page 18
COMPASS
5000.1 Build 81D
M
Company:
North America - ALASKA- BP
Project:
PBU
Site:
03
Well:
03-12
Wellbore:
03-12A
Design:
03-12A
BP
Final Survey Report
Local Coordinate Reference:
Well 03-12
ND Reference:
KB @ 64.00usft (13: 12 10/17/1979 00:00)
MD Reference:
KB Q 64.00usft (13 :12 10/17/1979 00:00)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
3282019 9:21:41AM Page 19 COMPASS 5000.1 Build 81D
PBU
^a^waTa+Nd^7DETAILS
0312ANBfERBNCflProject
st.a.e.Nont�tlWN:
+0312A Coaalrem(NLINMaerice. Wary o3tRirvaNoras+.aW
0}72
s®ae v.nmmrolael«wreftw swLwal
Wtllbom: 0312A
°°^?'°'O°0312 seaw Nsl nela•�re.vm-1O00N,OM)
Nin: 0312A
see�wawra�i MD: giW.00 "a OwN Nebrwoa. NB@64WWtJI3:11 ttl1n19R9wW1
CaloYallon NeNod. Ftimmum Curcalue
EmUng (200 usNin)
Mean Sea Level
+�e
bp
�� �
North America - ALASKA - BP
PBU
03
03-12
03-12A
03-12A
AOGCC Offset Well Report
06 February, 2019
502
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
03
Site Error:
obousft
Reference Well:
03-12
Well Error:
0-00usft
Reference Wellbore
03-12A
Reference Design:
03-12A
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 03-12
Mean Sea Level
KB @ 64.00usft (13: 12 10117/1 97 9 00:00)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
03-12A
Filter type:
NO GLOBAL FILTER: Using user defined selection & littering criteria
WARNING: There is hidden fight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program
Date 2/62019
From
To
Reference
(usft)
(usft) Survey (Wellbore)
Tool Name Description
50.00
9,150.00 Survey #2 (03-12)
GYD-GC-MS Gyrodata gyrocompassing m/s
9,169.40
10,745.00 03-12A (03-12A)
MWD MWD -Standard
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
03
03-04 - 03-04 - 03-04
5,430.54
5,650.00
130.91
03-05 - 0345 - 03-05
4,712.84
4,925.00
388.92
03-06 - 03-06 - 03-06
2,531.11
2,525.00
489.64
03-07 - 0307 - 03-07
2,407.29
2,400.00
373.28
03 -07 -03 -07A -03-07A
2,388.60
2,375.00
373.03
03-08 - 0308 - 03-08
2,410.41
2,400.00
246.77
03-11 - 03-11 - 03-11
2,363.65
2,375.00
119.51
0313 - 0313 - 03-13
1,999.71
2,000.00
106.34
0314-0314-03-14
1,974.72
1,975.00
232.19
0314 -03 -14A -03-14A
1,981.95
1,975.00,
232.22
03-14-03-14B-03148
1,981.95
1,975.00
232.22
03-14 - 03-14BLI - 03-14BLI
1,981.95
1,975.00
232.22
03-26 - 0326 - 0326
4,517.43
4,950.00
454.08
03-33 - 03.33 - 03-33
5,667.58
6,000.00
32.26
03 -33 -03 -33A -03-33A
5,667.58
6,000.00
32.26
03 -33 -03 -33B -03-33B
5,672.73
6,000.00
31.72
03-33 - 03-33C - 03-33C
5,672.73
6,000.00
31.72
0335 - 03-35 - 03-35
3,427.62
3,500.00
255.50
0335 -PLAN 03 -35A -03-35A WP01
3,427.62
3,500.00
255.50
0336 - 0336 - 03-36
2,177.78
2,175.00
39.79
0336 -03 -36A -03-36A
7,149.46
7,825.00
25.60
09
16
16-14 - PLAN 16-14C - 16-14C WPD4
9,500.00
15,850.00
295.55
ZWO19 8:31:13AM Page 2 of 3 COMPASS 5000.1 Build 81D
Company:
North America- ALASKA - BP
Project:
PBU
Reference Site:
03
Site Error:
0 00usft
Reference Well:
03-12
Well Error:
0.00usft
Reference Wellbore
03-12A
Reference Design:
03-12A
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well 03-12
Mean Sea Level
KB @ 64.00usft (13: 1210/17/197900:00)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to KB @ 64.00usft (13: 12 10/17/1979 Coordinates are relative to: 03-12
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 Stale Plane Zones, NAD27' OGP-Use AK
Central Mendian is 150° V0.000 W ° Grid Convergence at Surface is: 1.63"
2/62019 8,31:13AM Page 3 of 3 COMPASS 5000.1 Build SID
Printed 3/18Q019 10:10:OOAM
North America - ALASKA - BP
Page 1 of 2
Cementing Report
Common Well Name: 03-12 / 01
-
�eport no.'. 1 'Report date: 2/3/2019
Project: PBU
Site:
03
'Spud DeteRime'. 10H 7/1979
Event Type. COM- ONSHORE (CON)
Start Dale: 2/1/2019 End Dale: 2/4/2019
AFE No.:
Contractor'. NABORS ALASKA DRILLING INC. Rig Name/No.'. CDR -2 '', Rig Release: 2/4/2019
X3 -0198W -C: (784,308 00 )
BPUOI: USA00001385
Active datum: KB @64.00u ft (above Mean Sea Level)
General Inforrrtatlon
Job type: Primary
Cement job start date/time'. 2/3/2019 10 45A
Job end datettime: 2/4/2019 12 54P
Cement Company: SCHLUMBERGER
Cementer:
Cemented String: LINER 1
String Size: 2.875 (in)
String Set TMD: 10,745.00 (usft) Hole Size: 4.250 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Rotating Time (Start -End):
RPM:
Rotating Torque (init/avg/max): (ft-Ibf)
Reciprocating Time (Start -End):
Recip Drag Up/Down: - (kip)
SPM: Stroke Length:
Fluid Nemo: CEMENT
Flulds (1 of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
LEAD SLURRY Density: 15.30 (ppg)
Yield 1.3100 ("sk)
Mix Water Ratio:
Excess:
20.00(%) Mix Method. BATCH
Sacks Used: 141.00 (941b sacks)
Water Volume:
0.0 (bbl) Excess Slurry Volume:
5.5 (bbl) Density Measured by. DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
32.9 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
PV:
YP: Viscosity:
Gels 10 Sec:
Gels 10 Min:
AddENee
Name
Type
Amount Units
Concentration Unit
D163
CEMENT
5.000
%BWOC
D047
ANTIFOAMAGENT
0.100
%BWOC
D208
ANTIFOAMAGENT
0.100
%BWOC
D065
DISPERSANT
1.000
%BWOC
D600
GAS -BLOCK
1.500
%BWOC
D167
FLUID LOSS
0.100.%
Bwoc
F1uld Tests
Thick time
ThickFree
water
Free vrater
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp
Comp Strength
Comp Strength
(hr)
temp.
(%)
temp.
(ccJ30min)
temp.
press.
Strength
Strength
Strength
Strength Time
Pressure 2
Temperature 2
(°F)
(°F)
(°F)
(psi)
Time 1
Pressure 1
Temperature 1
2
(psi)
(°F)
min(psi)
°F
(min)
4.83
0.00
80.00
44.0
175.00
1,000.00
Printed 3/18Q019 10:10:OOAM
North America -ALASKA - BP Page 2 or 2
Cementing Report
Common Well Name: 03-12 / 01
Fluid pumped
Volume
Avg.
Reportno . 1 Report date' 2/3/2019
Prelecf. PBU
- — --
_._
Site. a3
-
Spud Date/Time. WH7/1979 -
Event Type. COM ONSHORE (CON)
r
Start Date. 2/1/2018
_
�Entl Date' 2/4/2019
AFE No
Contractor: NABORS ALASKA DRILLING INC._
Rate
Rig Name/No.: CDR -2
Rig Release: 2/4/2019
X3 -0198W C: (784,308,00)
BPUOI: USA00001388
job
F–Aclive datum�64.00usR (above Mean Sea Leval)
Used temp.
temp.
Time before test:
(bbl)
sftgu
(bbl min)
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
Top
Bottom
Plug
Pressure
Float
Pressure
Returns
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rate
Press.
Plug
Plug
Bumped
Bumped
Hem
Hem
N
Prior
Surface
Mud Lost
Flow
Bond Quality:
(gpm)
(psi)
Temp Survey:
N
(psi
Remedial Cement Required'
(min)
Him Prior to Log:
(hr)
(bbl)
(bbl)
After
1
RIMARY CEMENT
8,740.00
10,745.00
ling Schedule
Fluid pumped
Volume
Avg.
Max Oisp.
Slurry Top
Slurry Base Sart Mix Cmt
t Mix Cmt
S
Start Slurry
Pumping end Start Diap
Foam
Gas Type
Gas Vol BH circ.
Bh static
(ppg) Positive Test Tool: N
Pumped
Disp.
Rate
TMD
TMD
Pm p
datettime
job
Hours Before Start:
Used temp.
temp.
Time before test:
(bbl)
Rate
.LA„_._,
(bbl min)
(usft)
(usft)
Cmt Found on Tool:
N
(scf)
Tuft
Liner
Test Pressure:
(psi)
FIT/LOT:
(ppg)
Liner Overlap:
(usft)
Time:
(min)
Tool:
N
Positive Test:
(ppg) Positive Test Tool: N
Cement Found between Shoe and Collar: N
Open Hole Length:
(usft)
Negative Test:
(ppg) Negative Test Tool: N
Hours Before Start:
(hr)
Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretation Summary
CBL Run:
N
Cement Top:
(usft)
Under Pressure:
(psi)
How Determined:
Bond Quality:
TOC Sufficient:
N
CET Run:
N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator
Temp Survey:
N
Remedial Cement Required'
N
Him Prior to Log:
(hr)
How Determined:
Printed 3/18/2019 10:10:OOAM
BAER00 PRINT DISTRIBUTION LIST
FlUGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME 03-12A
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
2 18 153
30 45 9
ase sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
:rotechnical Data Center, 1.112-1
E. Benson Blvd.
:horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR - RES
LOG DATE January 31, 2019
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider@bhge.com TODAYS DATE March 13, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
I BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConucoPhillips Alaska Inc.
Atm: Ricky Elgarico
1ATO 708
760 G Street
Anchorage, AK 99501
3 Exxon Mobil, Alaska
Attn: Lvnda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
FIELD I
FINAL
CD/DVD
FINAL
PRELIM
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN
Ur MIN
# OF COPIES
I#uFCOPIES
# OF COPIES
4 lu IG 4 JJ I;
0 1 0 1 1 1 1 1 0
RECEIVED
4 State of .Alaska - AOGCC 0 1 1 0 0
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division ofOil & Gas *** 0 0 B 0
Attn: Resource Evaluation
550 West 71h Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alasla) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
.Anchorage, Alaska 99508
,Attn: Rana Elghoni my
TOTALS FOR THIS PAGE:
0 2 4 2 0
MEMORANDUM
TO: Jim Regg l p
P.I. Supervisor
FROM: Lou Laubenstein
Petroleum Inspector
NON -CONFIDENTIAL
i
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, March 6, 2019
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC.
03-12A
PRUDHOE BAY UNIT 03-12A
Sre: Inspector
Reviewed By:
r
P.I. Supry 5�
Comm
Well Name PRUDHOE BAY UNIT 03-12A API Well Number 50-029-20392-01-00 Inspector Name: Lou Laubenstein
Permit Number: 218-153-0 Inspection Date: 2/27/2019
Insp Num: mitLOLI90227154527
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well F 03-12A 7 Type lnj w- TVD s'--''9 -Tubing 1935 1918 1919 iQ8 -
PTD z1s1s3o Type Test sPTTest psi 2057 IA 1s nso- 901 N,89
BBL Pumped: 4.9 BBL Returned:1, 3.4 OA 1 4 T
Interval ! OTHER P/F IP
Notes: Post CTD redrill
Wednesday, March 6, 2019 Page 1 of I
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Ryan Ciolkosz
Drilling Engineer
BP Exploration (Alaska), Inc.
P.O Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 03-12A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 218-153
Surface Location: 965' FSL, 887' FWL, SEC. 11, TI ON, R15E, UM
Bottomhole Location: 1394' FSL, 3494' FWL, SEC. 11, TION, R15E, UM
Dear Mr. Ciolkosz:
333 West 7th Avenue
Anchorage, Alaska 99501
Main: 907.297.1433
Fax: 907.276.7542
www.aogcc.claskd.gov
Enclosed is the approved application for the permit to redrill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
k
DATED this ?-q day of r�weMb�r, 2018.
STATE OF ALASKA
.SKA OIL AND GAS CONSERVATION COMMISSIC�
PERMIT TO DRILL
20 AAC 25.005
REGE E)
np\ n g ?p?$
1a. Type of Work:1b.
Proposed Well Class: Exploratory - Gas ❑ Service - WAG 0 1 Service - Disp❑
1c. Specify if well is proposed for:
Drill ❑ Lateral ❑
Strafigraphic Test ❑ Development - Oil ❑ Service -Winj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hydratgs,❑
Redrill 0 - Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 'Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380'
PBU 03.12A
3 Address:
6. Proposed Depth:
12. Field/Pod(s):
P.O. Box 196612 Anchors a AK 99519-6612
MD: 10784' • TVD: 8618'ss
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028327
g DNR Approval Number:
13. Approximate spud date:
Surface: 965' FSL, 887' FWL, Sec. 11, T10N, R15E, UM '
1018' FSL. 3131' FWL, Sec. 11, TION, RISE, UM
74-017
January 1, 2019
Top of Productive Horizon:
9. Acres in Property: 2560
14. Distance to Nearest Property:
Total Depth: 1394' FSL, 3494' FWL, Sec. 11, T10N, R15E, UM
702( 1 % '/ 2-
4b Location of Well (State Base Plane Coordinates - NAD 27):
10, KB Elevation above MSL: 64 -feet
15. Distance to Nearest Well O n
Surface: x- 714158 . y- 5937030 Zone - ASP 4
GL Elevation above MSL: 26.15 'feet
[0 Sas e Poole
16. Deviated wells: Kickoff Depth: 9170 feet
17. Maximum Anticipated Press in prig (see 20 AAC 25.035)✓
Maximum Hole Angle: 115 degrees
Downhole: 3476 Surface: 2576 '
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Len m
MD TVD vin TVD (tincludino sta edata)
4-1/4" 3-1/4"x2-7/8" 66#/6.5# 13Cr85 STLITCII 2024'
8760' 8294'ss 10784' 8618'ss sx Class'G'
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (it): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
9733 9276
9266
9266
8846
9265
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 20" 550 sx Arctic Set 38-118 38-118
Surface 2730 13-3/8" 3000 sx Fondu. 400 sx AS II 37-2767 37-2740
Production 9657 9-5/8" 600 sx Class'G', 300 sx AS I, 75 sx AS 1 36-9693 36-9240
Scab Liner 6356 7-5/8" 442 sx Class'G'. 316 sx Class'G' 3253-9610 3193-9165
Scab Liner 254 11/2' 67 sx Class'G' 9262-9516 8642-9079
Perforation Depth MD (ft): 9120-9470 Perforation Depth TVD (it): 8706-9037
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Huard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Browning. Zachary H
from without prior written approval.
Contact Email Zachary.erowning0bp.com
Authorized Name Ciolkosz, Ryan R
Authorized Title Drilling Engineer Contact Phone *1 907 564 5220
Authorized Signature Gy''� Date /J / r7 ( 18
sr
Commission Use Only
Permit to Drill _
Permit Approval
See cover letter for other
Number: Z2 ��
API: 50- 029-20392-01-00
Date:
requirements:
Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas h rates, or gas contained in shales.
Other:is oi' E %Fs -r — b' -3A-bO�4 v Samples req'd: Yes ❑/ No H Mud log req'd: Yes ❑ No
Gia L't o f#pG GC �R JW� f 0 Q H2S measures Yes IR No ❑lDirectional svy req'dYFf N ❑
Z6A.4C_2S_Spacing exception req'd: Yes 11 NInclination-only svy req'd: Yes 11 No
APPRouWj
,1Post initial injection MIT req'd: Yes ❑ No ❑
A�e.b.,.d➢ avl�v�a,,-e Pl� ��aeelt4RM�T�E.(� �pi4/Q-C_2.5,//j.(.:',
f
fb — q6 r1 POS -r Q 11 L1N1G APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date: r I2.g're
� � V 4AP Nle+RL.d bmitF^Ia
Form tOJ01 Revised 5/2017 This permit is valid for 4 e royal (20 AAC 25.005(8)) Submit Pons and
Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Zach Browning
CTD Engineer
Date: November 7, 2018
Re: 03-12A Permit to Drill Request
`%N#0
bpi
Approval is requested for a permit to drill a CTD sidetrack lateral from well 03-12 with the Nabors CDR2
Coiled Tubing Drilling rig on or around January 15t, 2019.
Proposed plan for 03-12A:
The coil sidetrack 03-12A will be a 1614' injector sidetrack targeting injection into the Zone 2B and 4B
sands. The CST will be drilled as part of the 2019 East of Sag drilling campaign. It is scheduled to be drilled on or around
February 11t, 2019. During pre -rig work it is proposed to set a 7-5/8" Delta whipstock with TOWS at 9,170' MD in the 7-
5/8" scab liner. The rig will move in, test BOPE and kill the well. A 3.80" window+ 10' of rathole will be milled. The well
will be U-shaped; kick off in Zone 4, dip down into Zone 2 and toe up into the top of the reservoir. The proposed sidetrack
will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place and selectively perforated.
Rig Work (scheduled to begin February V, 2019)
1.
MIRU and test HOPE 250 psi low and 3,500 psi high (HASP 2576 psi).
2.
Mill 3.80"Window +30'ofrathole
3.
Drill production section: 4.25" OH, —1,614' (Build with 35 deg DLS, 20 deg DLS in lateral
planned).
4.
Run 3-1/4" x 2-7/8" 13Cr liner to TO 3
5.
Pump primary cement job: s, 15.3 ppg Class G, TOC at TOL (8760 MD)*.
6.
Freeze protect well to a min 2,500' TVDss.
7.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(1)
Post -Rig Work:
1. SL/FB: Drift with dummy pert guns. Set LTP if needed.
2. C: CBL, 100' of perforations: 2" Millennium guns.
3 k Pc r
Well Details for 03-12A:
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (464 psi over -balance).
Disposal:
• All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >11 must go to GNI.
Hole Size:
• 4.25" for entirety of the production hole section.
Liner Program:
• 2-7/8", 6.5#, STL 13C olid liner: 10,784' MD -9950' MD
• 3-1/411, 6.6#, TC Cr solid liner: 9950' MD -8760' MD
• A planned .0 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 8760' MD).
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (464 psi over -balance). -
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 115", inclination at kickoff point is 71°.
• Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run.
• Distance to nearest property -17,425'
• Distance to nearest well within pool -300' (planned 16-14C) / 764' (09-03A) '
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
• Cement bond log will be run post rig inside the production liner.
Perforating:
• Perforating: -100' of perforations, 2", 60 deg random phasing, 6 spf, pert guns.
• Perforating planned post rig on service coil.
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards: W,
• DS 3 is considered an 1-12S pad. No recent H2S data on 03-12 (injector). Max recorded on the pad: 1100 ppm on 03-
02 (1/19/11).
• There is one planned fault crossing along this well plan with medium loss potential.
• Overall Lost circulation risk on 03-12A is considered Medium. '
Reservoir Pressure:
• The reservoir pressure on 03-12A is expected to be 3476 psi at 9022' TVDSS (7.41 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2576 psi.
• A min EMW of 8.4 ppg for this well will provide 464 psi over -balance to the reservoir.
Injector Area of Review: /
• An AOR has been done for all wells within Y. mile. It is attached to the PTD request.
Zach Browning CC: Well File
CTD Engineer Joseph Lastufka
564-5220
03-12A AOR
Distance
Top Of Oil
Top of
Top of
from
of 011 Pool
Top of Cement
Resrvoir
Cmt Ops
Mechanical
Well Name
Planned
Status
Status
Pool (TSAR,
(TSAD, TVDss)
Cement
Cement
Determined By—
Status
ZanN lsolallon
Summary
Integrity
Comments
MD)
(MD)
(TVDss)
Well het
Estimated TOC (1587'
3/11/2018:
VOlumetric(no
annular cement) and
600 sks of 15.8
MIT -IA
03-12
NA
Operable Injector- LTSI
9090
8613
9107
7668
Open perts
Parent well
recorded losses)
Production packer set at
class
passed t0
8653' MD.
2490 psi.
Non -
Estimated TOC (2118'
operable:
annular cement) and
TxIA.
03-30
Pcsiset at 9090'with class
9/10/2019 -
Producer: Non-operable.
G cement in liner and
S00 sks 15.8
CMIT -TxIA
P&A'd in preparation for
Volumetric (no
tubing from 9090'-7800'
ppg class G and
passed to
TAA Communication discovered September
1320
sidetrack.
9140
86431
69121
6572
recorded losses)
P&A'd
MD (8/11/18).
300 sks CSS
13691 psi.
2017. Sidetrack planned Spring 2019.
Estimated TOC (1628'
3/21/2015:
GM3A •
annular cement) and
MIT -IA
•
Volumetric (no
Pert open for
Production packer at 8721'220
sks of 15.8
passed to
730
Producer: On -Line
12922
8633
7387
7157
recorded losses)
production
MD.
ppg class
3500 psi
Estimated TOC and 270 113
11/2/2018:
Class G 9289'-9841' CHIP
500 sks 15.8
MIT -IA
03-32
'
Volumetric(no
P&A with 03-
@ 7815', 176 R3 Class G
ppg class G and
passed to
1260
P&A'd moved to 03-32A
9388
8638
7536
6955
recorded losses)
32A Sidetrack
7631-7766
300 sks C51
3182 ps1
11/2/2018'
03-32AEstimated
TOC P&A
MIT1A
Volumetric Ino
P&A with 03-
Cement 85]1' and CIBP @
285 sks 15.8
passed to
1295
P&A'd moved to 03-32B
9267
8627
7426
6868recorded
losses)
1328 Sidetrack
5227'
ppg class
13182 psi
Estimated TOC and packer
03-33A '
set @ 10,113' MD, ]licit
12/06/16
15.6 ppg LARC Cement in
500 sks 15.9
MIT -IA
Volumetric Ino
P&A via 03-
IA from 9950'-10113'and
ppg class G and
Passed to
1150
P&A'd moved to 03-33C
10383
8654
8528
7168
recorded losses)
33B sidetrack
18 bbls Class G P&A
300 sks CS
3436 psi
12/06/16
03-33C
Estimated TOC (1518' of
MIT -IA
'
Volumetric Ino
Perf open for
annular cement) and
235 sks 15.8
Passed to
960
Injector On-line
1 10578
8645
90541
7558
recorded losses)
injection.
packer set at 10,338' MD.
ppg class
3436 si
Estimated TOC (1500'
Planned 607 sks
Planned MIT
planned
planned
Planned
annular cement) and
of 15.8 ppg
IA to 3500
Scheduled to be drilled before 03-12A. Watch
1300
Planned Well
9184
8643
7684
]232
Volumetric
planned perfs
production packer.
class G.
psi.
Schedule.
Estimated TOC (1500'
Planned 465 sks
Planned MIT.
16-14C
planned
planned
Pis ad
annular cement) and
15.8 pp"
IA to 3500
Cu rently scheduled after 03-12A. Watch for
430
Planned Well
10291
8749
8800
7673
CBL
planned perts
production packer
G.
psi.
placement on the schedule.
North America - ALASKA - BP
PBU
03
03-12
PLAN 03-12A
Plan: 03-12A WP09
BP Coil Tubing Report
25 September, 2018
BAIGHES
TER
1 a GE company
P Y
Company:
North America -ALASKA - BP
Project:
PBU
Site:
03
Well:
03-12
Wellbore:
PLAN 03-12A
Design:
03-12A WP09
BP
03, TR -10-15
BA. ICER
BP Coil Tubing Report
rj IGHES
From:
Map
cEmmaa
Local Co-ordinate Reference:
Well 03-12
Slot Radius:
TVD Reference:
Mean Sea Level
MD Reference:
KB Q 64.00usft (13:
12 10117/1979 00:00)
North Reference:
True '
Easting:
Survey Calculation Method:
Minimum Curvature
Wellhead Elevation:
Database:
EDM RSK - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK /Alaska zone 4 [26734'1586• Using geodetic scale factor
Site
03, TR -10-15
Site Position:
Northing:
From:
Map
Fasting:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
03-12, 03-12
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore PLAN 03-12A
Magnetics Model Name Sample Date Declination
l°I
BGGM2018 2/1/2019 17.11
Design 03-12A WP09
Audit Notes:
Version: Phase: PLAN
Vertical Section: Depth From (TVD) +NIS
(usft) (usft)
-26.90 0.00
5,939,219.130 usft
712,287.910 usft
0.000 in
5,937,029.520 usft
714,158.000 usft
26.90 usft
Latitude:
Longitude:
Grid Convergence:
Latitude:
Longitude:
Ground Level:
Dip Angle Field Strength
1°) (nT)
80.92 57,429
Tie On Depth: 9,150.00
+FJ -W Direction
(usft) (I
0.00 8063
70'14'13.210N
148° 17'8+774 W
1.61 °
70° 13'51.163 N
148° 16' 16.249 W
26.15 usft
9252018 2: 29: 11PM Page 2 COMPASS 5000.1 Build 81D
Company: North Amanda - ALASKA - BP
Well 03-12
Project: PBU
Mean Sea Level
Site: 03
KB @ 64.00usft (13 : 12101171197900:00)
Well: 03-12
True
Wellbore: PLAN 03-12A
Minimum Curvature
Design: 03-12A WP09
EDM R5K - Alaska PROD - ANCP1
Survey Tool Program Date 9/25/2018
GVD-GC-MS
From To
Gyrodata gyrocompassing
(usft) (usft) Survey (Wellbore)
50.00 9,150.00 Survey #2 (03-12)
9,150.00 10,784.39 03-12A WP09 (PLAN
03-12A)
Planned Survey
! ,
MD Inc Azi
(usft)
9,150.00 15.96
123.60
03-12 Actual Survey -TIP
9,170.00 16.05
123.56
KOP
TVDSS
9,190.00 14.52
127.15
Start DLS 35.00 TFO 150.00
ENV
9,194.16 13.28
130.32
42N
9,200.00 11 62
135.87
9,230.00 7.33
198.67
Start DLS 35.00 TFO 95.00
(usft)
9,232.66 7.30
205.99
42P
9,263.10 13.13
260.40
TCGL
(usft)
9,300.00 24.89
277.69
9,321.81 32,24
282.00
BCGL
2,251.88
9,388.64 55.21
288.61
25N
9,400.00 59.14
289.32
9,405.71 61.12
289.66
25P
BP to
BP Coil Tubing Report BJUGHES
.GEc..p ny
Local Co-ordinate Reference:
Well 03-12
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 64.00usft (13 : 12101171197900:00)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
9/252018 2:29:11PM Page 3 COMPASS 5000.1 Build 81D
Tool Name
Description
GVD-GC-MS
Gyrodata gyrocompassing
m/s
! ,
MWD
MWD - Standard
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(usft)
(usft(
(°/100usft)
(usft)
V)
8,670.45
48.91
2,251.88
5,937,142.340
716,407.475
0.00
2,229.78
0.00
8,689.67
45,86
2,256.47
5,937,139.421
716,412.154
0.45
2,233.81
-7.01
8,708.97
42.81
2,260.78
5,937,136.502
716,416.541
9.00
2,237.56
150.00
8,713.00
42.19
2,261.55
5,937,135.901
716,417.337
35.00
2,238.23
150.00
8,718.71
41.33
2,262.48
5,937,135.071
716,418.282
35.00
2,239.00
146.93
8,748.36
37.34
2,263.97
5,937,131.124
716,419.890
35.00
2,239.82
141.50
8,751.00
37.03
2,263.84
5,937,130.807
716,419.770
35.00
2,239.65
95.0
8,781.00
34.71
2,259.57
5,937,128.365
716,415.570
35.00
2,235.06
8774
8,815.86
35.05
2,247.70
5,937,128.369
716,403.688
35.00
2,223.39
34.01
8,835.00
36.87
2,23744
5,937,129.902
716,393.387
35.00
2,213.57
17.57
8,883.00
49.51
2,193.38
5,937,141.284
716,348.988
35.00
2,172.16
13.78
8,889.16
52.62
2,184.36
5,937,144.129
716,339.881
35.00
2,163.76
8.90
8,892.00
54.27
2,179.69
5,937,145.649
716,335.168
35.00
2,159.43
8.51
9/252018 2:29:11PM Page 3 COMPASS 5000.1 Build 81D
BP
BP Coil Tubing Report
JUGHES
a GEmmpa
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Wall 03-12
Project: PBU
TVD Reference:
Mean Sea Level
Site: 03
MD Reference:
KB @ 64.00usft (13:
12 10117/1979 00:00)
Well: 03-12
North Reference:
True
Wellbore: PLAN 03-12A
Survey Calculation
Method:
Minimum Curvature
Design: 03-12A WP09
Database:
EDM R5K - Alaska PROD - ANCPI
Planned Survey
MD Inc
Azi
TVDSS
NIS
EMI
Northing
Easting
DI -eq
V. Sec TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft) (')
9,434.23
71.00
291.19
8,903.56
63.36
2,155.30
5,937,154.049
716,310.530
35.00
2,136.84
8.34
Start Tum 21.15
9,438.65
71.00
292.12
8,905.00
64.91
2,151.41
5,937,155.481
716,306.600
2000.
2,133.26
89.90
24N
9,487.80
71.01
302.52
8,921.00
86.20
2,110.19
5,937,175.597
716,264.786
2000.
2,096.05
91.68
24P
9,500.00
71.00
305.10
8,924.97
92.62
2,100.60
5,937,181.740
716,255.023
2000.
2,087.64
90.57
9,573.80
71.02
320.71
8,949.00
139.98
2,049.64
5,937,227.628
716,202.743
19.99
2,045.07
92.47
22N
9,600.00
71.00
326.25
8,957.53
159.88
2,034.90
5,937,247.099
716,187.448
2000.
2,033.77
91.14
9,674.23
71.00
341.95
8,981.70
222.81
2,004.34
5,937,309.140
716,155.109
19.99
2,013.87
92.57
Start DLS 20.00 TFO 40.00
9,684.82
72.63
343.37
8,985.00
232.41
2,001.34
5,937,318.649
716,151.841
20.00
2,012.47
40.00
22P
9,700.00
74.98
345.37
8,989.24
246.45
1,997.42
5,937,332.573
716,147.518
20.00
2,010.89
39.55
9,772.86
86.45
354.50
9,001.00
317.08
1,984.98
5,937,402.809
716,133.082
20.00
2,010.12
39.00
Invert
9,795.25
90.00
357.23
9,001.69
339.39
1,983.37
5,937,425.063
716,130.837
20.00
2,012.16
37.5
Start OLS 20.00 TFO 40.00
9,800.00
90.73
357.84
9,001.66
344.13
1,983.16
5,937,429.803
716,130.497
20.00
2,012.73
40.00
9,900.00
105.90
11.05
8,987.19
442.29
1,990.57
5,937,528.124
716,135.114
20.00
2,036.03
40.00
9,904.25
106.53
11.64
8,986.00
446.29
1,991.37
5,937,532.146
716,135.803
20.00
2,037.47
41.94
22P
9,956.10
114.07
19.24
8,968.00
493.11
2,004,22
5,937,579.309
716,147.319
20.00
2,057.77
42.11
22N
9,962.66
115.00
20.26
8,965.28
498.73
2,006.24
5,937,584.982
716,149.176
20.00
2,060.68
44.75
Start Tum 22.07
10,000.00
115.00
28.50
8,949.50
529.52
2,020.20
5,937,616.159
716,162.252
20.00
2,079.47
88.26
9252018 2:29: 11PM
Page 4
COMPASS 5000.1
Build
81D
Company:
North America -ALASKA - BP
Project:
PBU
Site:
03
Well:
03-12
Wellbore:
PLAN 03-12A
Design:
03-12A VYP09
Planned Survey
MD
(usft)
10,050.87
24P
10,072.15
24N
10,100.00
10,117.10
25P
10,140.77
25N
10,200.00
10,263.82
BCGL
10,300.00
10,375.04
TCGL
10,400.00
10,431.82
42P
10,500.00
10,521.73
42N
10,542.66
Start Turn -22.07
10,600.00
10,700.00
10,760.72
TSADIHRZ
10,784.39
TD at 10784.39
BP
BP Coil Tubing Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
BA ER
F�UGFIES
GE comp,,.
Well 03-12
Mean Sea Level
KB @ 64.00usft (13, 12 10/17/1979 00:00)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Inc
Azi
TVDSS
NIS
EAN
Northing
Easting
DLeg
V. Sec
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
115.00
39.73
8,928.00
567.63
2,046.01
5,937,654.985
716,186.973
2000.
2,111.14
115.01
44.42
8,919.00
581.94
2,058.93
5,937,669.654
716,199.479
20.00
2,126.22
115.00
50.57
8,907.23
598.99
2,077.53
5,937,687.222
716,217.589
20.00
2,147.35
115.02
54.34
8,900.00
608.43
2,089.82
5,937,697.007
716,229.599
2000.
2,161.01
115.02
59.57
8,890.00
620.12
2,107.79
5,937,709.206
716,247.235
20.00
2,180.65
115.00
72.64
8,864.97
641.82
2,156.77
5,937,732.285
716,295.572
19.99
2,232.50
115.03
86.73
8,838.00
652.15
2,213.53
5,937,744.225
716,352.013
19.99
2,290.19
115.00
94.71
8,822.71
651.74
2,246.29
5,937,744.745
716,384.773
20.00
2,322.45
115.00
111.26
8,791.00
636.51
2,312.33
5,937,731.392
716,451.214
19.98
2,385.12
115.00
116.78
8,780.45
627.30
2,332.98
5,937,722.776
716,472.120
20.03
2,404.00
115.02
123.80
8,767.00
612.76
2,357.87
5,937,708.952
716,497.407
20.00
2,426.19
115.00
138.85
8,738.19
572.08
2,404.14
5,937,669.597
716,544.811
19.99
2,465.21
115.01
143.65
8,729.00
556.73
2,416.46
5,937,654.602
716,557.564
20.00
2,474.87
115.00
148.27
8,720.16
541.01
2,427.08
5,937,639.192
716,568.625
20.00
2,482.79
115.00
135.61
8,695.92
500.18
2,459.05
5,937,599.289
716,601.740
19.99
2,507.68
115.00
113.54
8,653.66
449.06
2,533.21
5,937,550.301
716,677.319
19.98
2,572.53
115.02
100.14
8,628.00
433.15
2,585.76
5,937,535.892
716,730.299
19.99
2,621.78
- 115.00
94.92
8,618.00
430.34
2,607.02
5,937,533.687
716,751.627
20.00
2,642.30
TFace
1°)
87.60
88.91
88.81
88.83
88.87
87.34
86.90
88.51
86.48
88.83
88.33-
8689
88.83
89.18
-87.32
-85.29
-87.04
-89.20
9/252018 2:29: 11PM Page 5 COMPASS 5000 1 Build 81D
BP
BP Coil Tubing Report
BF�UGHES
a GEmmpany
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 03-12
Project:
Pau
TVD Reference:
Mean Sea Level
Site:
03
MD Reference:
KS @ 64.00usft (13' 12 10/17/1979 0000)
Well:
03-12
North Reference:
True
Wellbore:
PLAN 03-12A
Survey Calculation Method:
Minimum Curvature
Design:
03-12A WP09
Database:
EDM RSK - Alaska PROD - ANCP1
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
9,150.00
8,670.45
48.91
2,251.88
03-12 Actual Survey - TIP
9,170.00
8,689.67
45.86
2,256.47
KOP
9,190.00
8,708.97
42.81
2,260.78
Start DLS 35.00 TFO 150.00
9,230.00
8,748.36
37.34
2,263.97
Start DLS 35.00 TFO 95.00
9,434.23
8,903.56
63.36
2,155.30
Start Turn 21.15
9,674.23
8,981.70
222.81
2,004.34
Start DLS 20.00 TFO 40.00
9,795.25
9,001.69
339.39
1,983.37
Start DLS 20.00 TFO 40.00
9,962.66
8,965.28
498.73
2,006.24
Start Turn 22.07
10,542.66
8,720.16
541.01
2,427.08
Start Turn -22.07
10,784.39
8,618.00
430.34
2,607.02
TO at 10784.39
91252018 2:29: 11PM Page 6 COMPASS 5000.1 Build 81D
North America - ALASKA - BP
PBU
03
03-12
PLAN 03-12A
03-12A WP09
Anticollision Summary Report
25 September, 2018
BA UGHES
1 aGEcom an
p Y
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
03
Site Error:
0,00usft
Reference Well:
03-12
Well Error:
0.00usft
Reference Wellbore
PLAN 03-12A
Reference Design:
03-12A WP09
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
BA ER
I UGHES
a
GE .m,,
Well 03-12
Mean Sea Level
KB @ 64.00usft (13 1210/171197900:00)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCPi
Offset Datum
teference
03-12A WP09
Centre to
'liter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Measured
nterpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
)epth Range:
9,150.00 to 10,784.39usft Scan Method:
Tray. Cylinder North
tesults Limited by:
Maximum center -center distance of 1,274.73usft Error Surface:
Elliptical Conic
Survey Tool Program Date 9/25/2018
From To
(usft) (usft) Survey Wellbore) Tool Name Description
50.00 9,150.00 Survey #2 (03-12) GYD-GC-MS Gyredata gyrocompassing m/s
9,150.00 10,784.3903-12A VVP09(PLAN 03-12A) MWD MWD - Standard
Summary
Site Name
Offset Well - Wellbore - Design
03
03-04 - 03-04 - 03-04
03-05 - 03-05 - 03-05
03-06 - 03-06 - 03-06
03-07 - 03-07 - 03-07
03-07 - 03-07A - 03-07A
03-08 - 03-08 - 03-08
03-11 - 03-11 - 03-11
03-12 - 03-12 - 03-12
03-13 - 03-13 - 03-13
03-14 - 03-14 - 03-14
03-14 - 03-14A- 03-14A
03-14 - 03-14B - 03-14B
03-14 - 03-14BL1 - 03-14BL1
03-26 - 03-26 - 03-26
03-33 - 03-33A - 03-33A
03-35 - 03-35 - 03-35
03-35 - PLAN 03-35 - 03-35A WP01
03-36 - 03-36A - 03-36A
09
09-03 - 09-03A- 09-03A
09-03 - 09-03A- Plan#7 09-03AApproved
16
16-14 - PLAN 16-14C - 16-14C WP04
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation Warning
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
(usft)
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
9,150.00 9,150.00 0.00 0.00 0.00 Pass-NOERRORS
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
10,425.00 11,300.00 1,269.05 51546 873.21 Pass - Major Risk
Out of range
Out of range
Out of range
10,175.00 11,625.00 934.39 163.12 769.55 Pass - Major Risk
10,164.54 11,599.98 944.35 217.21 727.19 Pass - Major Risk
9,507.14 15,900.00 330.74 203.20 129.28 Pass - Major Risk
91252018 1:58.54PM Page 2 of 3 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
03
Site Error:
O.00usft
Reference Well:
03-12
Well Error:
O.00usft
Reference Wellbore
PLAN 03-12A
Reference Design:
03-12AWPO9
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
BIUGHES
a GE mmpany
Well 03-12
Mean Sea Level
KB @ 64.00usft (13: 1210/17/1979 00:00)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to KB @ 64.00usft (13 : 12 10/17/1979 Coordinates are relative to: 03-12
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.63°
Ladder Plot
$ 03-04, 03-04, 03-04 V1
�f 0305,03-05,03-05%0
$ 03 -06,031D6,03 -06V1
$ 03-07,03-07,03-07V1
$ 03-07,03-07A03-07AV8
$ 03-08,03-08,03-08V1
-F 03-11,03-11,03-11 V5
$ 0312,0312,0312V1
Measured Depth (2000 usftlin)
LEGEND
-ir 03-14, 0314, 03-14 Vt
$ 03-14,03-14A,03-14AV12
$ 0314,03-14B4O3-14BVO
-rs- 0314,0314BL1, 0314BL1 V0
-rh- 0326,0326,03-26V4
-A- 03-33,03-33,0333V2
$ 03-33,0333A,0333AV1
-)E 0333,0333B4O3336V3
$ 0335,0335,03-35V1
-*- 0335, PLAN03-35,0335AV\P01 VO
$ 03-36,03-36,03-36V1
$ 0336,0336AO336AV5
-XF 0903,0903A,0903AVO
-� 0903,0903A,Plar*70903AApprovedV0
-� 16-14, PLAN 16-14C, 16-14CV\PO4VO
$ 0312AV4109
9252018 1:58..54PM Page 3 of 3 COMPASS 5000.1 Build 81D
WELL DETAILS: 0312
Ground Level: 26.15
NOMIy Ezi UUXude Lon94.de
0.00 0.00 5937029.520 714158.000 70'13'51, W3 14W 16-16.249 IN
WELLBORE DETAILS: PLAN 03-12A
Project:
03-12A
In9'exm.m n r
��
0Plan:
50e: 01
03
Wait: 03.12
Parent Wellbore03-12
WuyaocFetl
ry kP ID3.c
Tie on MD:9150.00
Wellbore: PIAN 0112A
sec
�~
Im
n3.12A WPW 10312/PLAN O].12A)
&I
DI1
r.Nex SoAoal
WELL DETAILS: 0312
Ground Level: 26.15
NOMIy Ezi UUXude Lon94.de
0.00 0.00 5937029.520 714158.000 70'13'51, W3 14W 16-16.249 IN
WELLBORE DETAILS: PLAN 03-12A
RETERENCENF01441TION
03-12A
CMard.(WE3RN ,. WC1012.TM3a WM
SECTUNDETALS
WMCX11JW1)RBW. Umnse eel
Parent Wellbore03-12
8ecaon N9lRare : $10 (OOON.OWE)
Tie on MD:9150.00
nbaN.edOwm Rebm'�: n8N64.01kMU3: 1210117MMOOSM
sec
cmmem 6wmd Mlvmmcw,Xre
1100
IW0
900
800
G 700
600
CD
T
400J
C �
j 300\
,G 200
O
VI 300
03-12A WP09
03-12A TI
001111.104
BAKER
7. ES
U3 -33C 03.12 vaun5
03-12A
0330
400, 26 1
1400 1500 1600 1700 1800 1900 2000 21W 2200 2300 2400 2500 2W0 2700 2800 2900 3000 31W 3201
West( -)/East(+) (100 usft/in)
.60o
2]M"
Ui-I2A WWF)
TAlNIR2 03-12 Actual Suncy-TIP 95 M' Y 75W DUO Sinn Exil -TOWS To HnN111
XLSU
03-12A WP09 KOP 03-12A T2
42N SUM OLS 3500 TFO 15000
T 42N
X]SV. J2P SUM 207
p 4 SUMOLS J5 UU TF095 r0
�tlIWU-icci
4
Nx50�OL
6e. Tun 21.13
N
n X9W °$5N
�24N
y X950-�2N SUM OLS2000TF040W
F '22N
1. 22P Sion Tum 2207
.IUM
Ul-@PTI
SUM OLS 2UUII TM 4UW
9050
91W
Mean SMIC-In.M1. 1450 15. I55a I.. IGso no. 111. IXuu I55n Ive'l 1950 2aao 2.30 21.0 2130 2200 22M 23M 2150 2400 2450 2500 2550 24U1 WSU 270U 2750 2XCO 2950 29M 2950 RUM 3050 31W 3150 32W Jxsn 33M
Vertical Section at 80.63' (50 usfi/in)
SECTUNDETALS
AN40TATIDNS
sec
MO
Im
Azi
&I
aEUS
</.W
Deg
TFace
Vasa Target
TVD
MD
Annotation
1
9150.00
15.96
123.60
0670.45
48.91
2251.88
0.00
0.00
2229.78
867045
9150.00
03-12AL1ualSumay-TIP
2
9170.00
16.05
123.56
8689.67
45.86
2256.47
OA5
d.01
2233.81
8689,67
9170.00
KOP
3
9190.00
14.52
127.15
8700.97
42.81
2260.78
9.00
150.00
2237.56
8708.97
9190.00
StanDLS35.00TF0150.00
4
9230.00
7.33
198.67
8748.36
37.34
2263.97
35.00
150.00
2239.82
8748.36
9230.00
StaeDLS35.00TF095.00
5
943413
71.00
291.19
8903.56
63.36
2155.30
35.00
95.00
2136.84
8903.56
9434.23
StanTurn 21.15
6
967423
71.00
341.95
8981.70
222.81
2004.34
20.00
90.00
2013.87
8981.70
9674.23
Start DLS20.00TF040Ae
7
979525
90.00
357.23
9001.69
339.39
1983.37
20.00
40.00
2012.16
9001E9
9795.25
Start DLS 20.00 TFO 40.00
8
996266
115.00
20.26
8965.28
498.73
2006.24
20.00
40.00
2060.68
8965.28
996266
StartTurn 22.07
9
10542.66
115.00
148.27
8720.16
541.01
2427.08
20.00
90.00
2482.79
6720.1610542.66
StartTum-22.07
10
10794.39
115.00
94.92
061&00
430.34
2607.02
20.00
-90.0
2642.30
861800
10784.39
TD at 10784.39
1100
IW0
900
800
G 700
600
CD
T
400J
C �
j 300\
,G 200
O
VI 300
03-12A WP09
03-12A TI
001111.104
BAKER
7. ES
U3 -33C 03.12 vaun5
03-12A
0330
400, 26 1
1400 1500 1600 1700 1800 1900 2000 21W 2200 2300 2400 2500 2W0 2700 2800 2900 3000 31W 3201
West( -)/East(+) (100 usft/in)
.60o
2]M"
Ui-I2A WWF)
TAlNIR2 03-12 Actual Suncy-TIP 95 M' Y 75W DUO Sinn Exil -TOWS To HnN111
XLSU
03-12A WP09 KOP 03-12A T2
42N SUM OLS 3500 TFO 15000
T 42N
X]SV. J2P SUM 207
p 4 SUMOLS J5 UU TF095 r0
�tlIWU-icci
4
Nx50�OL
6e. Tun 21.13
N
n X9W °$5N
�24N
y X950-�2N SUM OLS2000TF040W
F '22N
1. 22P Sion Tum 2207
.IUM
Ul-@PTI
SUM OLS 2UUII TM 4UW
9050
91W
Mean SMIC-In.M1. 1450 15. I55a I.. IGso no. 111. IXuu I55n Ive'l 1950 2aao 2.30 21.0 2130 2200 22M 23M 2150 2400 2450 2500 2550 24U1 WSU 270U 2750 2XCO 2950 29M 2950 RUM 3050 31W 3150 32W Jxsn 33M
Vertical Section at 80.63' (50 usfi/in)
Project: Pau
Site: 03
Well: 0342
WaWrore: PLAN03.12A
Pm:03-12A WPOB (03-121PLAN03.12A)
ANTFCOUMION SETTINGS
COMPANY DETAILS: NOMAmrtice-AIASNA-BP
Interpola8onhlelhod 1011),intena1:25D0
Calculabon MCMod. MinimureCuroature
DepthRange Fmm: 9150.00 To 10784.39
Error System'. ISCMA
Results Lioness By: Centre Distance: 1274.73
Scan Method: Trey. Cylinder Noel
Reference: Plan: 03-12A MOD(03-1&PLAN 0341 )
Error Surface: ENpOoalConic
Mann, Modred, Rubs Based
adrier Pint
03-04, 03-04, 0304 V1
- 0345, 03-05.0305 VO
- 03-08. 0345. 03-05 Vt
- 03-07. 03407. 0347 V1
0347, 034rA, 03-0TA VB
03-08. 0348. 0348 V1
Measured Depth (50 usfUin)
-03-11, W11, 03.11 V5
- 03-12, 03-12, 03-12 V1
03-13, M13, 03-13 V1
03-14, 03-14, 03-14 Vt
a 0}14, 03.14A, 03-14AV12
03-14, 03.14B. 01148 VO
03.14, 03-14BL1. 03-14911 VO
- 034D5. 0345. 03.25 V4
-. 03-33. 03., 03a3 W
- 03.33. 0133A, 0333A V1
03-33, 03338, 0333B V3
0333,03330.03-33CW
03-35, 0345, 03-35 V1 • 1&14, PLAN 10-14C, 19-14L M04 VO
03-35, PLAN 03.35, 0335AM01 VO o 03.13A VYP08
• 0338, 0335.0305 V1
0308, 0305A, 03.35A VS
-09-03. OB03A, OB -030,W
09-03, 0903A, PIa070903AAppr.aW VO
BA ER
F�UGHES
a GE comlw "
From Colour To MD
9150----9310
9310 9380
9380 10784
Possible Magnetic Interference:
From KOP to 9,310' MD
Project:
PBU
Site:
03
Well:
03-12
Wellbore:
PLAN03-12A
Plan: 03-12A WP09 (03-12/PLAN
03-12A)
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America - ALASKA - BP
8erpolation Method: MD, interval: 25.00
Calculation Method: Minimum Curvature
Depth Range From: 9150.00 To 10784.39
Error System: ISCWSA
Results Limited By: Centre Distance: 1274.73
Scan Method: Trav Cylinder North
Reference: Plan: 03-12A WP09(03-12/PLAN 03-12A)
Error Surface. Elliptical Conic
Warning Method, Rules Based
Depth Range. 9150.00 To 10784.39
if 0100 -----7-1
90
80
7d
60
From
Colour To MD
9150
9310
9310
9380
9380
10784
BA ER
F�UGHES
Gnaw15
.Nia .EU womin9 5.5.9 r.,w: xwinut11 In".w.
saa 0.00 sm9asw 714151.900 70•LT$1A69N 1x•u•x.2xw
a00 Mu me IPJ Ivu .1415 .FJ -W U09 TFace V550
1 9150.00 15.96 123.60 8670.45 48.91 2251.88 0.00 0.00 2229.78
2 9170.00 16.05 123.56 6689.67 45.86 2256.47 0.45 -7.01 2233.81
3 9190.00 14.52 127.15 8706.97 42.81 2260.78 9.00 150.00 2237.56
4 9230.00 7.33 198.67 8748.36 37.34 2263.97 35.00 150.00 2239.82
5 9434.23 71.00 291.19 8903.56 63.38 2155.30 35.00 95.00 2136.84
6 9574.23 71.00 341.95 8981.70 222.81 2004.34 20.00 90.00 2013.87
7 9795.25 90.00 357.23 9001.89 339.39 1983.37 20.00 40.00 2012.16
8 9962.66 115.00 20.26 8965.28 498.73 2006.24 20.00 40.00 2060.68
9 10542.66 115.00 148.27 8720.16 541.01 2427.08 20.00 90.00 2482.79
10 10784.39 115.00 94.92 8618.00 430.34 2607.02 20.00 .90.00 2642.30
De71N Flan De ih To S -WPI- Ta01
50.00 9150.00 5uwWQ(0112, GYDGLMS
915000 10754.39 MWD
20
IDD y ,OG LEGEND
180 9112.0s12, W2v1 - OLD, 09 a w. PU07asaxnpvlae9 v@ 60
0139.0.3 M 03.Il4v1 . 11414. PIAN 16140, 14140 wva4 ua
Azimuth from North [°]vsCentre to Centre Separation [10usfiAh-°'°'"°AzimuthromNGrth[°]vsCenteeoCentreSeparation[40usNin]
0
y
V
03-364
Mean Sea Level
Pro'Ba: PBU
I
c� 'T win
M Wrt wm. 1111
Site: 01
CoaammlNElnNwxea. M0312. T.F
Wall: 03-12
veaema. tYm Sea tnd
e (WOl aa
Wet. PLANOY12A
-�
PIan:O112AWP09PIus B00NMDIO3-19PLANO}IM)
ewvi.�1
0112A VW09
wnm
WELLBORE DETAILS. PLAN W -12A
BEFECd3WENsmtAMiNm
03-11A
CoaammlNElnNwxea. M0312. T.F
veaema. tYm Sea tnd
e (WOl aa
Parent Wellbme: 03-12
sacmalvs)B.mrzrce: 9-(awRaWE)
Tie on MD: 915D00
Aka°aetlOMbRelare�. KB@6400eee(13121W12II919WU0)
0112A VW09
CAWWh.Ne9 M.aaa C.Wee
Easting (100 usfn)
03-33A
03-12A WP09 Plus 5Wt MD
0
0
0 03-33B
03-33
BJUGHES
a GE(ompen,
03-36
0112A VW09
Oo
O
S
O
O�
SOO�
O
O
�
16-14C WP04
9000
yo
o
y
03-12F WP09
Plus 5000 MO
Oa
'OHO
O
5�
00
6;^
00
eO
�O
03-12
o
�
�
�
o
N
6
�O
Q
yy
yo
�o
y
0335A WP01
03-05
, p3-35
0104
0
0
0 o
e
o
0 0
o e o
0
o
Easting (100 usMin)
0 0 0
0 0
0
0
0 03-33B
03-33
BJUGHES
a GE(ompen,
03-36
North America - ALASKA - BP
PBU
03
03-12
PLAN 03-12A
03-12A WP09 Plus 500ft MD
AOGCC Offset Well Report
25 September, 2018
BA UGHES
1 aGEcom company Y
Company:
North America -ALASKA - BP
Project:
PBU
Reference Site:
03
Site Error:
0.00usft
Reference Well:
03-12
Well Error:
0 0ousft
Reference Wellbore
PLAN 03-12A
Reference Design:
03-12A WP09 Plus 500ft MD
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
BA ER
I UGHES
eE«m y
Well 03-12
Mean Sea Level
KB @ 64.00usft (13 12 10/17/1979 00:00)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
03-12A WP09 Plus 500ft MD
Centre to
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Centre
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
9,150.00 to 11,284.39usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program Date 912512018
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
50.00 9,150.00 Survey #2 (03-12) GYD-GC-MS Gyrodata gyrocompassing m/s
9,150,00 11,284.39 03-12A WP09 Plus 500ft MD (PLAN 03-12 MWD MWD- Standard
Summary
Site Name
Offset Well - Wellbore - Design
03
03-12 - 03-12 - 03-12
03-12 - PLAN 03-12A - 03-12A VVP09
D9
16
Reference
Offset
Centre to
Measured
Measured
Centre
Depth
Depth
Distance
(usft)
(usft)
(usft)
9,150.00
9,150.00
0.00
10,784.39
10,784.39
0.00
9252018 2:41:33PM Page 2 of 2 COMPASS 5000.1 Build BID
TREE = Cwv 6318'
WEUJiFAD=
FMC
ACTUATOR=
AXEISON
KB. ELEV =
64'
W. ELEV =
--I
KOP=
2260'
Max
15 PJC PLLLNPREDLICER(12/25/14)
tunAD=
9315
Datum
WINS' K-22 ANCHOR SEAL ASSY, D= 4.00'
TVD= 6600'SS 0=19.124'
518' CSG, 47#, L-80 FrY D 563, D = 8.881' 1640'
1-5/8' BOV%EN CSG PATCH, D = 9.06' 1840' - 1642'
13-318' CSG, 72#, L-80 BTC, D = 12.347' 2762'
2' TBG, 17#, L-80 TCA .0232 bpi, D = 4.89r 3162'
E: PVA
0V-1 is INJECTION ALLOWED-ONLY/NOMI
169T 9-518' IES ES CEMENTER
162W 9-58' BKR ISOZON: ECP, D = 8.720'
r2169' S7/Y HES X NP, D=4.56r
244
t 2322' 958'FOC
3' 9-518' FOC
TOP OF 7-58' SCAB LNR 7294'
AM TOP HC PORTID SEAL STEM, D = 6.83• 7299'
��■�x.
7294' --I10' T1W TIEBACK SLV, D = 7
7304' 8-518• X 7-58' TTN SPF6-H FlCR w / HYD HGR
8622' 4-1IY FES X NP, D = 3.813'
BM' 7-516" X 4 -IW PTEs TNr PKR D = 3.856•
Minimum ID = 2.813" @ 9286'
11/05179
3-112" HES X NIPPLE (SCAB LNR)
OFIGiNAL COMPLETION
ISKRAS
8736' 4-1/2- FR6X FP, D=3.813'
878WW 4-vY WLEG, D = 3.955
W1M#1
4-12' TBG, 12.60, L-80 VAM TOP/Tq, 8789'
15 PJC PLLLNPREDLICER(12/25/14)
8878' 4-12- BAKER PBR ASSY, D = 3.875•
0152 bpf, D = 3.958"
RWO
WINS' K-22 ANCHOR SEAL ASSY, D= 4.00'
04M7/15
M16
8888' 7-518' X 4-12' BKR SAIL -3 PI(R, D = 4.00' ',
16/0 SCAB LNRw/SLDSLV&CMT(090
04/28/15
8900' 5-12' BKR MLLOUT IXTBNSICN; D = 4.778'
CRLG HO CORFECTRONS
'16 OS/JND ADFERFS(10106116)
8906' 5 -12'X4 -12'X0, D=3.90'
JMD
DEPTI-I SIFT PER TALLY
B99O' 4-12'OILSX TP D=3.813'
41/7 TBG -PC, 12.69, L-80 BTC AB -MOO,
.0152 bbf, D = 3.958'
PERFORATION SUMMARY
Riff LOG: BRCS ON 1429179
ANGLE AT TOP PEW: 17' @ 9118'
Note: Refer to Production DB for historical perf data
SIZE SPF I INTERVAL jOprVSqzj SHOE I SOZ
SEEPAGE 2 FOR FEIFORATON DATA
4-12' TBG -PC, 126#, L-80 BTC AB -MOD,
.0152 bpf, D = 3.958'
EST TOC (08128116)
PBTO (092616)
3-12' SCAB LW 9.3#, 13cr85, 0.0087 bpl
(0928116), D = 2.992'
7-518' LNR SCAB, 29.7#, L-80 FL4S,
.0459 bpf, D = 6.875'
9-58' CSG, 4744, L -8D BTC, D = 8.681'
9267' H 7-5/8' X 4-12' TIVV SS -BB R(R. D= 7
I 9266' I
10
DATE
��■�x.
��;%{.v,:� 65Iiiil7i�Irl.rS'?:JiY).'.e1 $�M'.i
REV BY COMMENTS
11/05179
14NN2
OFIGiNAL COMPLETION
ISKRAS
112w88
W1M#1
RWO
15 PJC PLLLNPREDLICER(12/25/14)
10
DATE
FIEV BY
COMMENTS
REV BY COMMENTS
11/05179
14NN2
OFIGiNAL COMPLETION
15 CK/JMD FNALOOE APPROVAL
112w88
W1M#1
RWO
15 PJC PLLLNPREDLICER(12/25/14)
02124188
RAM3
RWO
rlDlkTFlE
16 G�1 RLL PISSH& PLUG (06122&27116)
04M7/15
M16
RWO
16/0 SCAB LNRw/SLDSLV&CMT(090
04/28/15
JAD
CRLG HO CORFECTRONS
'16 OS/JND ADFERFS(10106116)
11413(#15
JMD
DEPTI-I SIFT PER TALLY
17 JMJMD CORRECTION TO CLOSED SLD SLV
FRJDFDE BAY LIMIT
WELL: 03-12
PERMIT No: 9790580
AR No: 50-029220392-00
SEC i i,=N,R15E, 966 FSL & 887' F
BP EXPJoration (Alaska)
03-12
P FORATION SUW WRY
REF LOG: BRCS ON 10129179
ANGLEAT TOP PEW: 17" @ 9118'
Note: Refer to Production CB for historical perf data
SIZE
SIPF
INTERVAL
OprdSgz
SHOT
SOZ
3-31W
4
9120-9140
S
05/27184
1120186
31/8"
4
9120-9140
O
1227/86
RLL FISH & PLUG (0622&27116)
13/8'
4
9120-9140
O
04/09189
042615
1118'
4
9142-9148
S
12107/86
JMD
13/8'
4
9144-9160
S
05/27/84
1120/86
11/8'
4
9144-9160
O
1227186
13/6'
4
9144 - 9160
O
04/09!89
1318"
4
9175-9192
S
05/27/84
1120/86
1118'
4
9175-9192
O
1227186
3-318"
4
9175-9192
O
04/09/89
1318'
4
9196-9206
S
0527184
112x86
11/8'
4
9196-9206
O
1227/86
1318"
4
9196-9206
O
04/09/89
1318"
4
9210-9220
S
02/23/80
1120/86
11/8'
4
9210-9220
O
1227186
1318'
4
9210-9220
O
04/09189
1318'
4
9242-9252
S
05/27/84
1120!86
1318"
4
9242-9252
O
04/09/89
3-318'
4
9275-9290
S
05/27/84
1120/86
1318"
1
9290-9295
O
06112/89
1318"
1
9350-9364
O
0612/89
138'
4
9374-9404
S
0223/80
1120186
13/8'
4
9414-9428
S
OWN80
1120/86
3 -NT
4
9446- 9474
S
0527184
1120/86
138'
1
9446-9474
O
06/12189
2-112'
6
9446-9456
O
10/06116
2-1/2'
6
9460-9470
O
1010616
DATE
REV BY
OONWENTS
DATE REV BY
CONVA94TS
11105179
RWN2
ORGINAL COMPLETION
05/01/15 CK/JMD FNALOCEAPFROVAL
112&88
WWI 81
RWO
05104/15 PJC
RLLN1PR®11C82(12f25114)
0224189
RWN 3
fNYO
062616 GIB/
RLL FISH & PLUG (0622&27116)
04117115
DAA
TNYO
10/0616 AT
SCAB LNt w/SLD SLV&CMT(0922
042615
JMD
DRLG HO COFFlECTIOP6
10/1616 DS/AV
ACPERFS (10106/16)
04130/75
JMD
DEPTH SHFT PER TALLY
05/30/17 JMJMD
CORECTIDN TO CLOSED SLD SLV
PFUDHOE BAY UNIT
WELL: 0112
PHUT No- '1790580
APINo: 50-029-20392-00
SEC 11,TKKR15E, 965' FSL & 887' FWL
BP Ekploratfon (Alaska)
TrEE=
WELLHEAD=
FMC
ACTUATOR=
DATE REV BY COWARM
1% ELB/=
64'
BF. BEV =
?
KOP
mw
Mm Angle
0224189
Tatum MD=
_
Datum TVD =
8800'SS
PROPOS.-)
REV 1
zo"conn,tto•
92#, 1440,
D =19.124'
CSG, 479, L-80 VAM TOP, D=8.881" -� 164W
/8• BOWB4 CSG PATCH. D - 9.06" 1868' - 164
TOP OF 7-5/8" SCAB LR H 72W
VAM TOP HC PORT® SEAL STEN, ID = 6.83" 7299'
Minimum ID = 2.377" @ 9950'
3-1/4" X 2-778" XO
4-1/2" TBG, 12.6#, L-80 VAMTORFC1,
.0152 bpf, ID = 3-958"
03-12 ALLOWED MAX;
.AX DLS:—NOT- @ ONL. INO MI CHROME LNRn�
2169' —j 5512' FES X NP, D = 4.562'
2322' 9-5/8' FOC
2443' 9-5/8" FOC
3162' 5 -12'X4 -12'X0, D=3.958'
3263' 9-5/8' X 7-5/8" BKR 2RH 2XP LTP, D = 6.77
3274' 9-5/8' X 7-5/8" BKR ■ PLFJCLOCK HGR D =
_?
873 —14-12- HESS X W. D = 3.813'
8780' 3.70• DEPLOY SLV, D = 3.00-
8789' H4 -112"!A D=3.958'
8878' 4-12"BAKBR PSR ASSY, D=3.875"
8896' K-22 ANCHOR SEAL ASSY, D=4.00"
8896' H 7-5/8' X 4-12" BKR SABL-3 PKR D = 4.00'
8900' H 5-12' BKR MLLOLIT EXTBJSKK D=4.778'
890 5-12' X 4-12• XO, D = 3.90"
j.4 -V2' TBG -PC, 12.6#, L-80 BTCAB-MOD. 9003• 9003' 4-12' WLEG, ID=4.00"
0152 bpi, D = 3.858•
8973'ELMD TT LOGE® 06/12/89
9093'&518" MAR ERJOW
17-5/8' WHIPSTOCK (_/_
7-5/8" LR SCAB, 29.7#, L-80
.0459 bpf, D = 6.875'
518' CSG. 47#. L-80 BTC. D =
—9214'
PERFORATION SU hAkF?Y
REF LOG: ON
ANGLEATTOPFEW _°
We: Refer to Produc8on DB for historical perf data
D = 2.377'
LNR, _#, 13 -CR _, h 10784'
ID =
DATE
REV BY
OO&fAN S
DATE REV BY COWARM
11105179
RWN 2
OMGINAL COMPLEnON
05/02!18 GS/JM BULT PROPOSED REV 1
11/26186
WWI #1 RWO
0224189
RWN3
WN0
04117115
0-16
RWO
_I_I_
CTD ST (03-12A)
05/01/18
JND
BUILT PROPOSED
PRUDHOE BAY LINO'
WELL 03-12A
P97MT No:
AR N0: 50-029-20392-01
SFC 11,TDN, R15l, 969 FSL & 887' FAL
BP Brplorallon (Alaska)
Well Bighole CDR2-AC 4 Ram BOP Schematic Date
Quick Test Sub to Otis -1.1 ft
Top of 7" Otis 1 0.0 ft
4DDR2 Rig's Dnp Pan
Distances from top of riser
Excluding quick -test sub
f 7-1/16" 5k Flange X T' Otis Box
Top of Annular _ 6.0 ft
Hydril 7 1118"
Top of Annular Element 6.7 ftA1B
Annular
Bottom Annular
CL Blind/Shears
CL 2-3/8" Pipe/Slips 10.1 ft
B3
Kill Line
CL 2-318" x 3-1/2" VBRs 12.6 h
CL 2-318" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft
�-- Swab
T1
CL of Flow Cross 17.4 ft
Master
CL of Master 18.8 k
LDS 0
IA
OA
LDS
Ground Level
T2
Choke Line
Test Pump Hose
03-12A Contingent Acid Design Basis
Volume to Top Perf:
178 bbls 158 bbls TBG and 20 bbls liner
Gross Volume Across Perfs:
0.98 bbls 100' in 3'/d"' liner
Net Perf Footage:
100' of perfs covering Ivishak
Acid Design:
19.9 gpf 12% HCI — 45 bbls
19.9 qpf 9/1 Mud Acid — 45 bbls
Diversion Design:
5 bbls OiISEEKER
Fluid Requirements
Fluid Type
Volume al
Volume bbl
3% NH4CI + F103
19,152
456
12% HCI
1,890
46
9/1 Mud Acid
1,890
46
7.5% OiISEEKER
210
5
Diesel
2,310
55
Ammonium Chloride Recipe
Additive
SLB Code
Concentration
Quantity
NH4CI
N/A
250 ppt
4998 Ibs
Surfactant
F103
2 gpt
46 qal
12% HCI Recipe
Function
SLB Code
Concentration
Quantity
Acid Corrosion Inhibitor
A264
4 gpt
7.7 gal
Flowback Aid
F103
2 gpt
3.9 gal
Iron Control
L058
20 ppt
38.6 Ibs
Anti -emulsifier
W054
5 gpt
9.7 gal
9/1 Mud Acid Recipe
Function
SLB Code
Concentration
Quantity
Acid Corrosion Inhibitor
A264
4 gpt
7.7 gal
Flowback Aid
F103
2 gpt
3.9 gal
Iron Control
L058
20 ppt
38.6 Ibs
Anti -emulsifier
W054
5 gpt
9.7 gal
Mutual Solvent
U067
50 gpt
96.6 gal
Diversion Recipe
Function
SLB Code
Concentration
Quantity
Gelling Agent
J570
75 gpt
15.8 gal
NH4CI
N/A
250 ppt
52.5 Ibs
Methanol
N/A
10 gpt
2.1 gal
CT Mud Acid Pump Schedule
Stage
Description
Step
Fluid T e
Volume
bbls
Cum.
Volume
bbls
Pump Rate
(bpm)
Pump
Pressure
(psi)
Comment
Freeze Protect
1
Diesel
55
55
Max
1800
See details previous
Fluid packing
2
3% NH4CI
135
190
Max
1800
See details previous
HCI Stage
3
12% HCI
22.5
213
1-2
1800
See details previous
Mud Acid
4
9/1 Mud Acid
22.5
236
1-2
1800
See details previous
Flush
5
3% NH4CI
23
1 259
1-2
1 1800
See details previous
Diversion
6
OilSEEKER
5
264
1-2
1800
See details previous
Spacer
7
3% NH4CI
23
287
1-2
1800
See details previous
HCI Stage
8
12% HCI
22.5
310
1-2
1800
See details previous
Mud Acid
9
9/1 Mud Acid
22.5
333
1-2
1800
See details previous
OverBush
10
3% NH4CI
275
608
0.5 - Max
1800
See details previous
Rixse, Melvin G (DOA)
From: Hartley, Josephine <Josephine.Hartley@bp.com>
Sent: Thursday, November 29, 2018 8:46 AM
To: Rixse, Melvin G (DOA)
Cc: Lastufka, Joseph N
Subject: RE: PTD218-153, PBU 03-12A Stimulation
Hi Mel,
I had another look at my cement numbers for 03-12A and I think I found our differences. It looks like one of my numbers
for the length of the 7-5/8" was transcribed, resulting in a lower overall cement volume. Another difference is my excess
cement volume (20% vs your 30%), which results in a difference of 2.25 bbls. Here are my current numbers:
Thank you for catching my mistake.
-Josi Hartley
From: Summers, Matthew
Sent: Wednesday, November 28, 2018 3:51 PM
To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Cc: Hartley, Josephine <Josephine.Hartley@bp.com>; Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Subject: RE: PTD218-153, PBU 03-12A Stimulation
Hi Mel,
I will have to defer your question on cementing to Josephine & the Coil Drilling Team. I am the New Well Intervention
Engineer for most of our wells and am responsible for the post rig wellwork we execute.
On your first request about additional stimulation details:
Following perforating the injectivity test would be performed using a column of 1%KCI (8.35 ppg 0.434 psi/ft). The shale
frac gradient in this area is 16.3 ppg (0.85 psi/ft). Expected Reservoir Pressure is 3,300 psi & 178F @ 8,800' TVDss
Our target would be injection at -2 bpm (equating to 2,900 bwpd) and we would not exceed a pressure of 2,000 psi
which aligns with our Produced Water/Seawater injection supply pressure from the plant.
Bottom
Top Length
ID
OD
Capacity XS
Shoe Track
10784
10704
801
2.441
0
0.005788305
1
0.463064387
OH x 2-7/8
10704
9950
754.
4.25
2.875
0.009517073
1.2
8.611047698'
OH x 3.1/4
9950
9170
7801
4-25
3.25
0.007285798
1.2
6.819506509
7-5/8" x 9-1/4
9170
9003
167'
6.875
3.25
0.035654872
1
5.954363586
4-1/2" x 3-1/4"
9003
8895
1081
3.958
3.25
0.004957513
1
0.535411416
7-5/8" x 3-1/4"
8895
8789
106
6.875
3.25
0.035654872
1
3.779416408
4.1/2" x 3-1/4"
8789
8760
291
3.958
3.25
0.004957513
1
0.14376788
Side Exhaust
2
TOL Excess
2
Total
30.30657788'
Thank you for catching my mistake.
-Josi Hartley
From: Summers, Matthew
Sent: Wednesday, November 28, 2018 3:51 PM
To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Cc: Hartley, Josephine <Josephine.Hartley@bp.com>; Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Subject: RE: PTD218-153, PBU 03-12A Stimulation
Hi Mel,
I will have to defer your question on cementing to Josephine & the Coil Drilling Team. I am the New Well Intervention
Engineer for most of our wells and am responsible for the post rig wellwork we execute.
On your first request about additional stimulation details:
Following perforating the injectivity test would be performed using a column of 1%KCI (8.35 ppg 0.434 psi/ft). The shale
frac gradient in this area is 16.3 ppg (0.85 psi/ft). Expected Reservoir Pressure is 3,300 psi & 178F @ 8,800' TVDss
Our target would be injection at -2 bpm (equating to 2,900 bwpd) and we would not exceed a pressure of 2,000 psi
which aligns with our Produced Water/Seawater injection supply pressure from the plant.
(
In the attached word doc I've included additional details on fluids. The estimates provided are based on similar post
perforating stimulations we have performed on other recent injectors & WAG wells in the area assuming 100' of perfs.
Max treating pressure during the Acid job would be 1800 psi and average fluid weights through the well during
stimulation would be -8.4 ppg.
-Matt
From: Rixse, Melvin G (DOA) <melvin.rixse@alaska.eov>
Sent: Wednesday, November 28, 2018 1:53 PM
To: Summers, Matthew <Matthew.Summers@bp.com>
Subject: RE: PTD218-153, PBU 03-12A Stimulation
Matt,
must be missing something on your cement volume calculation for the primary cement job of 24.0 bbls. Can you
please review my calculations below to confirm where we differ?
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (MeIyin.Rlxse@alaska.aovI.
01
Volume w/
Depth From:
Depth To:
Delta
ID
OD
Capacity[bbl/ft]
Volume
Excess
Excess t
10784
10704
80
2.441
0
0.0058
0.46
0.00
0.46 S
2
10784
9950
834
4.25
2.875
0.0095
7.94
0.30
10.32 1
3
9950
9170
780
4.25
3.25
0.0073
5.68
0.30
7.39 1
6
9170
9003
167
6.875
3.25
0.0357
5.95
0.00
5.95 1
6
8896
8789
107
6.875
3.25
0.0357
3.82
0.00
3.82 1
3
9003
8896
107
3.958
3.25
0.0050
0.53
0.00
0.53 1
3
8789
8760
29
3.958
2.875
0.0072
0.21
0.00
0.21 1
Side exhaust
2.00
Excess above TOL
2.00
Total
32.68
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (MeIyin.Rlxse@alaska.aovI.
01
From: Rixse, Melvin G (DOA)
Sent: Wednesday, November 28, 2018 10:47 AM
To:'Summers, Matthew' <Matthew.Summers@bp.com>
Subject: PTD218-153, PBU 03-12A Stimulation
Matt,
With what weight fluid will you be performing your injectivity test to 2000 psi? What is the assumed fracture
gradient for the Ivishak confining shates?
Please add detail regarding the fluid volumes/weights and pressures you plan to utilize to perform the acid stim.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin. RixsePalaska.zovI.
From: Summers, Matthew <Matthew.Summers@bp.com>
Sent: Tuesday, November 27, 2018 3:S8 PM
To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>; Lastufka, Joseph N <Joseph.Lastufka@hp.com>
Subject: RE: 03-12A PTD
Hi Mel,
See the details below for the contingent stimulation we are proposing. I've underlined the key change to the CT scope
from the original Post -Rig Work in the Permit to Drill for 03-12A:
1. SL/FB: Drift with dummy perf guns. Set LTP if needed.
2. C: CBL, 100' of perforations: 2" Millennium Guns, contingent Acid Stim based on post pert infectivity
Stimulation Details: Acid Stim to be based on post perf injectivity test. If injectivity less than 2 bpm @ -2,000 psi acid
stim will likely be performed.
• Approximate Volumes Expected: -45 bbls HCI & -45 bbls of Mud Acid assuming 100' of perfs.
Please let me know if you need any other information. Thank you,
Matt Summers
x50661 M:(907)952-1682
From: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Sent: Monday, November 26, 2018 3:36 PM
To: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Cc: Summers, Matthew <Matthew.Summers@bp.com>
Subject: RE: 03-12A PTD
Joe,
Have the engineer send me an email discussing which step in the post rig ops the event would occur. I should be able
to approve by writing it into the permit to drill and attaching his email.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.RixsePalaska.zovI.
From: Lastufka, Joseph N <Joseph. Lastufka @ bp.com>
Sent: Monday, November 26, 2018 3:15 PM
To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.aov>
Cc: Summers, Matthew <Matthew.Summers@bp.com>
Subject: 03-12A PTD
Mel,
Would it be possible to include a contingent Acid Stint as part of the post Rig work on 03-12A? We've discovered in some
of our recent injectors that we need an acid stim after shooting the initial perforations for injection targets to be met. It
would be preferable to request the stim as part of the Permit to Drill so that there won't be any delay on site if a stim is
necessary.
Please let me know if you have any questions, we'll provide the specifics on the acid stim if you agree that it can be
included in the PTD.
Thank you,
Joe Lastufka
SIM Specialist
Cell: (907) 227-8496 1 Office: (907) 564-4091
r
v Subsurface & Wells
;n!omkacian Msraye+nonr
BP Exploration Alaska 1900 E. Benson Blvd. I Room: 717B I Anchorage, AK
03-12A Contingent Acid Design Basis
Volume to Top Perf:
178 bbls 158 bbls TBG and 20 bbls liner
Gross Volume Across Perfs:
0.98 bbls 100' in 3 '% liner
Net Perf Footage:
100' of perfs covering Ivishak
Acid Design:
19.9 gpf 12% HCI — 45 bbls
19.9 gpf 9/1 Mud Acid — 45 bbls
Diversion Design:
5 bbls OiISEEKER
Fluid Requirements
Fluid Type
Volume al
Volume bbl
3% NH4CI + F103
19,152
456
12% HCI
1,890
46
9/1 Mud Acid
1,890
46
7.5% OilSEEKER
210
5
Diesel
2,310
55
Ammonium Chloride Recipe
Additive
SLB Code
Concentration
Quantity
NH4CI
N/A
250 ppt
4998 Ibs
Surfactant
F103
2 gpt
46 qal
12% HCI Recipe
Function
SLB Code
Concentration
Quantity
Acid Corrosion Inhibitor
A264
4 gpt
7.7 gal
Flowback Aid
F103
2 gpt
3.9 gal
Iron Control
L058
20 ppt
38.6 Ibs
Anti -emulsifier
W054
5 gpt
9.7 gal
9/1 Mud Acid Recipe
Function
SLB Code
Concentration
Quantity
Acid Corrosion Inhibitor
A264
4 gpt
7.7 gal
Flowback Aid
F103
2 gpt
3.9 gal
Iron Control
L058
20 ppt
38.6 Ibs
Anti -emulsifier
W054
5 gpt
9.7 gal
Mutual Solvent
I U067
50 gpt
96.6 gal
Diversion Recipe
Function
SLB Code
Concentration
Quantity
Gelling Agent
J570
75 gpt
15.8 gal
NH4CI
N/A
250 ppt
52.5 Ibs
Methanol
N/A
10 gpt
2.1 qal
CT Mud Acid Pump Schedule
Stage
Description
Step
Fluid Type
Volume
bbls
Cum.
Volume
bbls
Pump Rate
(bpm)
Pump
Pressure
(psi)
Comment
Freeze Protect
1
Diesel
55
55
Max
1800
See details previous
Fluid packing
2
3% NH4CI
135
190
Max
1800
See details previous
HCI Stage
3
12% HCI
22.5
213
1-2
1800
See details previous
Mud Acid
4
9/1 Mud Acid
22.5
236
1-2
1800
See details previous
Flush
5
3% NH4CI
23
259
1-2
1800
1 See details previous
Diversion
6
OilSEEKER
5
264
1-2
1800
See details previous
Spacer
7
3% NH4CI
23
287
1-2
1800
See details previous
HCI Stage
8
12% HCI
22.5
310
1-2
1800
See details previous
Mud Acid
9
9/1 Mud Acid
22.5
333
1-2
1800
See details previous
Overflush
10
3% NH4Cl
275
608
0.5 - Max
1800
See details previous
Davies, Stephen F (DOA)
From: Browning, Zachary H <Zachary.Browning@bp.com>
Sent: Tuesday, November 13, 2018 2:04 PM
To: Davies, Stephen F (DOA)
Subject: RE: PBU 13-12A (PTD 218-153) - Question
No pre -production planned, we plan to perforate, establish injectivity and acidize if the rate is too low.
Thanks, Zach
From: Davies, Stephen F (DOA) <steve.davies@alaska.gov>
Sent: Tuesday, November 13, 2018 11:16 AM
To: Browning, Zachary H <Zachary.Browning@bp.com>
Subject: PBU 13-12A (PTD 218-153) - Question
Zach,
Will BP's planned PBU 03-12A injection well be pre -produced for 30 days or more, or will it simply be flowed back for
clean up?
Thank you,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
)AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies(aalaska.eov.
Remark:
N
AOGCC
PTD No. 218-153 Coordinate Check
9 November 2018
INPUT OUTPUT
Geographic, NA027 State Plane, NAD27
5004 -Alaska 4, U.S. Feel
PBU 03-12A ill
Latitude: 70 13 51.16300 NorthingN: 5937029.562
Longitude: 148 16 16.249 EastinglX: 714157.988
Convergence: 1 37 37.14676
Scale Factor: 0.999952101
Corpscon v6.0.1, U.S. Army Corps of Engineers
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD:
Development /Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: Zat-7 POOL:�Lr j
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
0---
No. , API No. 50-_-_----.
(If last two digits
(If
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150
PTD#:2181530 Company BP EXPLORATION (ALASKAN INC. - Initial Classlrype _
_ Well Name: PRUDHOE BAY UNIT 0-3ml 2A Program SER _ Well bore seg ❑
SERI PEND _GeoArea 890 Unit 11650 ___ On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven, gas conforms to AS31.05.0300.1.A),0.2.A-D) _ .......
NA
1
Permit fee attached _ -- - --- - - - - - - - - - - - - - - - - - - - - -
NA
- - - - - - - - - - - - - -
2
Lease number appropriate.. - _ _ . _
Yes
Entire well in ADL 028327, . _
3
Unique wellname and number - - - _ _ _ _ _ . _ _ _ _ _ _
Yes
Previously permitted as 198-236, but that Permit to Drill expired in November 2000._
4
Well located in. a. defined pool- - - . . ... . ............... . . . .
Yes
_ _ _ PRUDHOE BAY, PRUDHOE OIL POOL -64015,governed by CO 341E - - - - - -
5
Well located proper distance from drilling unit. boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..
Yes
CO 341F, Rule 2:. There shall be no restrictions. as. to well, spacing.except that. no pay shall be
�6
Well located proper distance from other wells . ............ .... ......
Yes
opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to
7
Sufficient acreageavailable in drilling unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
CO 341F, Rule 2.- -
8
If deviated, is wellbore plat. included _ _ _ _ _ .. _ _ _ _ _ _
Yes
9
Operator only affected party - - - - - - - - - - _ .. _ _ _
Yes
10
Operator has.appropriate_ bond in force _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
Appr Date
11
Permit can be issued without conservation order. _ _ _ _ _ _ _ ........... . .
Yes
12
Permit can be issued without administrativeapproval_ _ _ _ _
Yes
SFD 11/13/2018
13
Can permit be approved before 15 -day wait_ . . ..............
Yes
_ _ _ _ ........... .. _ _
14
Well located within area and. strata authorized by Injection Order # (put. 10# in.comments). (For.
Yes
_ _ _ _ - Prudhoe Bay Unit, Eastern Operating Area.is governed byAIO 4Gissued10/15/2015... .
15
All wells -within 1/4.mite.area.of review identified (For service well only).. - - -
Yes
- PBU 03-30, 09-03A, 03-32, 03-32A, 03 -33C,_03 -30A,. and 16-14C..
16
Pre -produced injector. duration of pre production less than.3 months, (For service well only)
No.
_ Noneplannedper BP email 1.1113/2Q18. . . . ... ........... .
18
Conductor string.provided _ _ _ .... _ _ _ _ _ _ _ _ _ _ _
Yes
_ . _ . This is a CTD sidetrack from an existing parent wellbore_
Engineering
19
Surface casing. protects all -known USDWS ___ _ _ _ _ _ _ _ _ _ _ _ _ _ ....
Yes
..... This is a CTD sidetrack from an existing parent wellbore..
20
C.MT vol adequate to circulate -on conductor & sud.csg ............ _ _ _ _ _
NA
_ _ _ This is a CTD sidetrack from an existing parent wellbore.
21
CMT.vol adequate to tie-in long string to.surf csg_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. .... ,
NA
_ _ _ _ This is a CTD sidetrack from an existing parent wellbore..
22
CMT will cover all knownproductive horizons - _ _ _ _ _ _ _ _ _ _ _
Yes
_ _ - Fully cemented solid liner_
23
Casing designs adequate for C, T B 8 permafrost- . . .............. _ .
NA
- - - This is a CTD sidetrack from an existing parent wellbore _
24
Adequate tankage -or reserve pit ... . . . . . . . . . . . . ....... . . _ _ _ _
Yes _
_ CDR2 rig will be utilized
25
If a re -drill, has,a 10-403 for abandonment been approved . . . . . . . . ........... . ..
NA
... _ _ Approved alternate plug placement with fullycemenled production. liner
26
Adequate wellbore separation proposed _ _ _ _ - _ _ _
Yes _
_ _ _ _ _ No collision riskfailures
27
If diverter required, does it meet regulations . . . . . . . . . . . . ....... . .....
NA
_ - This is a CTD sidetrack from an existing parent wellbore...
Appr Date
28
Drilling fluid program schematic & equip list adequate. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
MGR 11/29/2018
i29
BOPEs, do they meet regulation _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ _
Yes
30
BOPE.press rating appropriate; test to (put psig in comments) ..... . .............
Yes
_ ... 3500 psi pressure test, 5000 psi rating .... -
31
Choke manifold complies w/API RP -53 (May 84)________ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _
Yes
32
Work will occur without operation shutdown. _ _ _ _ _ _ _ ______ _ _ _ _ _
Yes
33
Is presence. of H2$ gas probable - _ _ ___ ____
Yes
.... DS3 is considered an H2S pad, standord.prwedures.in place
34
Mechanical condition of wells within AOR verified (For. service well only) - - - - - - - - - - -
Yes
_ _ - Review attached toprogram- - - - - - -
_
35
Permitcan be issued w/q hydrogen. sulfide measures . .. ... . . . .. . . . . . . - - - .. -
No
OS 03 wells are
_ _ _ ng. H2S measures are required.- -
Geology
36
Data, presented on potential overpressure zones . . . . . . .....................
Yes
Expected reservoirpressure is 7.4ppg EMW.. _ ... _ .......
Appr Date
37
Seismic analysis, of shallow gas -zones....... .............
NA.
- - - - - - - - - ........... _ . _ . _ .. _ .. .
SFD 11/13/2018
38
Seabed condition survey (if off -shore) . .. . . . . . . . . .............
NA
39
Contact name/phone for weekly progress reports. [exploratory only] - - - - - - _ _
NA
Geologic Engineering P
Commissioner: Date: 0� Commissioner: Date off/'"oner Date
'Pli�