Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-164DATA SUBMITTAL COMPLIANCE REPORT
10/3/2019
Permit to Drill
2181640 Well Name/No. PRUDHOE BAY UNIT F -34C Operator SP Exploration (Alaska) Inc. API No. 50-029-21980-03-00
MD
13133
TVD 8776 Completion Date
6/11/2019 Completion Status 1 -OIL
Current
Status 1-0I1- UIC No
REQUIRED
INFORMATION
Mud Log No✓
Samples No ✓
/
Directional Survey Yes -/
DATA
INFORMATION
List of
Logs Obtained: MWD/GR/CCL, GR/CCURPM
(from Master Well Data/Logs)
Well
Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OHI
Type
Med/Frmt
Number Name
Scale Media No Start Stop CH
Received
Comments
ED
C
31245 Digital Data
10187 13133
9/25/2019
Electronic Data Set, Filename: F-
34C_LW D_FINAL_FI ELD_COMPOSITE_07JUN2
019 BHI CTK.las
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-
34C_GR_Res _ 07JUN2019_MD_FINAL_FIELD_B
HI_CTK.cgm
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-
34C_GR_Res _ 07JUN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-
34C_GR_Res _ 07JUN2019_MD_FINAL_FIELD_B
HI_CTK.pdf
ED
C
31245 Digital Data
9QS12019
Electronic File: F-
07JUN2019_TVDSS_FINAL_FIEL
34C_GR_Res _f
D_BHI_CTK.pd
ED
C
31245 Digital Data
9/25/2019
Electronic File: F -34C Final Field Surveys.csv
ED
C
31245 Digital Data
9/25/2019
Electronic File: F -34C Final Field Surveys.xlsx
ED
C
31245 Digital Data
9/25/2019
Electronic File: F -34C Final Surveys.pdf
ED
C
31245 Digital Data
9/25/2019
Electronic File: F -34C Final Surveys.txt
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-34C_25_tapescan_BHI _CTK.txt
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-34C_5_tapescan_BHI_CTK.bd
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-34C_output.tap
ED
C
31245 Digital Data
9/25/2019
Electronic File: F-
34C_GR_Res _ 07JUN2019_MD_FINAL_FIELD_B
HI CTK.tif
AOGCC
Pagel of 3
Thursday, October 3, 2019
DATA SUBMITTAL COMPLIANCE REPORT
101312019
Permit to Drill 2181640 Well Name/No. PRUDHOE BAY UNIT F -34C Operator BP Exploration (Alaska) Inc. API No. 50.029-21980-03-00
MD 13133 TVD 8776 Completion Date 6/11/2019 Completion Status 1-0IL Current Status 1 -OIL UIC No
ED C 31245 Digital Data 9/25/2019 Electronic File: F-
34C_GR_Res _ 07JUN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.tif
Log 31245 Log Header Scans 0 0 2181640 PRUDHOE BAY UNIT F -34C LOG
HEADERS
Log 31246 Log Header Scans 0 0 2181640 PRUDHOE BAY UNIT F -34C LOG
HEADERS
ED C 31246 Digital Data 10000 13040 9/24/2019 Electronic Data Set, Filename: F-
34C_MRPM_PNC3D_RAW—
PASSOIDOWN_10J
UN2019_BHl.las
ED C 31246 Digital Data 10000 13046 9/24/2019 Electronic Data Set, Filename: F-
34C_MRPM_ PNC30_RAW_PASS02UP_10JUN2
019_BHl.las
ED C 31246 Digital Data 9/24/2019 Electronic File: F-
34C_MRPM_PNC3D_RAW _PASS01 DOW N_10J
UN2019 BFiTdlis
ED C 31246 Digital Data 9/24/2019 Electronic File: F-
34C_MRPM_ PNC3D_RAW_PASS02UP_10JUN2
019 BH1AIIS
ED C 31246 Digital Data 9/24/2019 Electronic File: F -
34C_ MRPM_PNC3D_RAW_10JUN2019_BHl.me
to
ED C 31246 Digital Data 9/24/2019 Electronic File: F -
34C MRPM PNC3D RAW 10JUN2019 BHI.PD
F _ _ _ _ _
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
INFORMATION RECEIVED
Completion Report Directional / Inclination Data Mud Logs, Image Files, Digital Data /Y�/C':7 Core Chips Y1
Production Test Informatio Y NA Mechanical Integrity Test Information,,,Yfff/ NA Composite Logs, Image, Data Files Ix / Core Photographs Y ,1�
Geologic Markers/Tops Daily Operations Summary r r Cuttings Samples Y19 Laboratory Analyses Y N
AOGCC Page 2 of 3 Thursday, October 3. 2019
DATA SUBMITTAL COMPLIANCE REPORT
10/3/2019
Permit to Drill 2181640 Well Name/No. PRUDHOE BAY UNIT F -34C Operator BP Exploration (Alaska) Inc.
MD 13133 TVD 8776 Completion Date 6/11/2019 Completion Status 1-0I1- Current Status 1-0I1
COMPLIANCE HISTORY
Completion Date: 6/11/2019
Release Date: 12/14/2018
Description Date Comments
Comments:
Compliance Reviewed
Date:
API No. 50-029-21980-03-00
UIC No
AOGCC Page 3 of 3 Thursday, October 3, 2019
BA M 0PRINT DISTRIBUTION LIST
I UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME F -34C
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT
Alaska
AUTHORIZED BY Frank Schwarzrock
EMAIL frank.schwarzrockjgbhge.com
STATUS Final Replacement
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
III' North Slope.
VOA, PBOC. PRB-20 (Office 109)
D&C Wells Project Aids Agatha Bulks & Barbara Classmaker
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 3-344
700 G Street
99501
No
21 81 64
3 124 6
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com
to acknowledge receipt of this data.
LOG TYPE RPM:PNC3D
LOG DATE June 10, 2019
TODAYS DATE September 20, 2019
Revision
Details:
Rev. Requested by: ---
FIELDI
FINAL
CD/DVD
FINAL
PRELIM
(las, chs, PDF, META,
SURVEY
I
REPORT
LOGS
LOGS
CGM, Final Survey
(Compass)
# OF PRINTS
# OF COPIES
19 OF COPIES
IF OF COPIES
9 A 4 4 4 4
RFcE`VAE�D
SEP 1) .
3 ExxonMobil, Alaska 1
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC 1 1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100 ISI
'Anchorage, Alaska 99501
5 DNB - Division of Oil & Gas *** 1
Attn: Garret Brown
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
,Anchorage, Alaska 99508
Attn: David Itter 0
CC
TOTALS FOR THIS PAGE: 0 1 4 0 0
216164
BA ER 31245,
PRINT DISTRIBUTION LIST
UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME
F -34C
FIELD Prudhoe Bav Unit
COUNTY PRUDHOE BAY
BHI DISTRICT
Alaska
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, 1112-1
) E. Benson Blvd.
:h, AK 99508 or GANCPDC@bp365.onmicrosoft.com
Icknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE June 7, 2019
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Ridera(7bhge.cgm TODAYS DATE September 23, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
4
( RP North Slope.
EOA. PBOC. PRB-20 (Office 109)
D&C Wells Project Aides
Attu: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
FIELD
FINAL
CD/DVDFINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTSW
Or PRIM
# OF COPIES
# OF COPIES
# OF COPIES
4 4 4
REcelViz
2 4 9nfn
3 ExxonMobil, Alaska 1
Attn: Lynda M. Yaskell andic r Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC 1 1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
.Anchorage, Alaska 99501
51 DNR - Division of Oil & Gas *** 1
11 Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
611 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-I
'1900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: David Itter
TOTALS FOR THIS PAGE: 0 1 4 1 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISF'W
WELL IMPLETION OR RECOMPLETION REPO: AND LOG
1? 0 n q
la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class.
.. - 20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL 11 No.
No. of Completions: One
�.Egploratocy,
EA
Service ❑ Stratigraphic Test
2, Operator Name:
6. Date_CgM_ Susp., or Abend.:
14. Permit to Dnll Number/Sundry
BP Exploration (Alaska), Inc
6/11/2019
218-164 •
3. Address:
7, Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
5/31/2019
50-029-21980-03-00
4a. Location of Well (Governmental Section):
8. Date TO Reached
16. Well Name and Number
6/6/2019
PBU F -34C
9 Ref Elevations KB 64.38
17_ Field/Pool(s):
Surface: 2133' FNL, 2412' FWL, Sac. 02, T11N, R13E, UM
Top of Productive Interval: 1555' FSL, 4340' FVJL, Sec. 35, T12N, R13E, UM
GL 35.02 BF 35.67
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MDfrVD):
18, Property Designation:
Total Depth: 2865' FSL. 675' FWL, Sec. 36, T12N, R13E, UM
13117'18778'
ADL 028280 & 028277 '
41b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 651959 • y- 5974667 Zone - ASP 4
13133'/ 8776' •
87-035
12, SSSV Depth (MD/TVD):
PO Thickness of Permafrost MDr VD:
TPI: x- 653807 y- 5978393 Zone - ASP 4
Total Depth: x- 655394 y- 5979736 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21. Re-dml/Lateral Top Wndow
MDrrVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
10208'/ 8779'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/CCL, GR/CCL/RPM
23. CASING, LINER AND CEMENTING RECORD
CASING
Wt. PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
30'
110'
30'
110'
13-3/8•'
68#
L-80
30'
2688'
30'
2688'
17-1/2"
3723 cu ft Permafrost
9-5/8"
47#
L-80
29'
7483'
29'
6735'
12-1/4"
2059 ou it Class'G'
7"
26#
L -W
7333'
10142'
6613'
8737'
B-1/2"
472 eu it UteCrete, 281 ou it Class'G'
4-1/2"
11 12.6#
13cre0
8494'
10208'
7508'
8779'
6-1/8"
236 cu ft Class'G'
3-1/2'x3-1/4"
x2-7/8"
9.3#/6.6#
I Al 5#
L-80
9606'
13133'
8351'
8776'
4-1/4"
165 sx Class'G'
24. Open to production or injection? Yes IZ No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
GRADE DEPTH SET (MD) PACKER SET (MD/TV
Size and Number, Date Pend):
4-1/2" 12.6# 13Cr80 8021' 7974'17112'
2" Gun Diameter, 6 set 6/10/2019
11463'- 11650' 8751'- 8756'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11750'- 12850' 8762'- 8790' -
COMPLETION
-�
6 too
Was 0 AAC 25.28 unng used during completion? Yes ❑ No 0
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
DEPTHINTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED
VERIFIED
2500' Freeze Protect w/ 38 Bbls Diesel
Holl
27. PRODUCTION TEST
Data First Production: June 19, 2019
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date of Test: 62319
Hours Tested:
Production for
nil -Bbl:
Gaa-MCF:
Water -Bbl:
Choke So..
Gas -Oil Ratio:
e
Test Period y
512
1434
50
58
2803
Flow Tubing 200
Press
Casing Press:
820
Calwlated
24 Hour Rale y
Oil -Bbl:
1023
Gas -MCF:
2867
Water -Bbl:
100
Oil Gravity- Apt (cor):
Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
RBDMS1L6wJUL 9 8 2019 ,4-1, 9-4,1
28. CORE DATA I Conventional Core(s) Yes ❑ No Rl I - Sidewall Cores Yes ❑ No a
If Yes to either question, list formations and intervals coned (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No RI '
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
10148'
8741' separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Sag River
10148'
8741'
Kicked off from Parent Well
10208'
8779'
(F -34B)
Shublik
10229'
8792'
Sag River (Invert)
10569'
6791'
Shublik (Revert) (Fault)
11069'
8768'
Sag River (Invert)
11285'
8759'
Formation at total depth:
Sag River (From Base)
11285'
8759'
31. List of. Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Hartley, Josephine
Authorized Title : SIMS tial t Contact Email: Josephine.Hartley(gibp.com
Authorized Signature: p I I Contact Phone: +1 9075644570
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples ortests from a well must be submitted to the AOGCC, no matterwhen the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the Corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
TREE = CW4'
VVELLHEAD=
13 -SW CNV
ACTUATOR=
CNV SH 3000
OKB. ELEV =
65.64'
F03:EI.Elf=
64.36'
BF. BEV =
35.6T
KOP=
750D
Max Angle =
101- Q 10440'
DattxnlMD=
NA
JMD D 1FT F-34
689, L-80,
D= 12A15 -
Minimum ID = 2.31" @ 9616'
2-7/8" X NIPPLE IN UP
x
.0152 bpf, D = 3.958'
D = 8.681'
1 8021' 1
80, VAM TOP,
bpf, D = 3.958-
Z^1' NOTE *4-12" CHROME TOO"' WELL
.> -70° 10273'. MAX DLS:38.3°
10318'.
2192' -J4-12'HESX NP, D=3.813'
CJMs I FT MAN01a--_s
ST
MD
I ND
I DEV
I TYPE
I VLV I LATCH
PORI
DATE
5
3248
3244
13
MMG
DOME RK
16
0622/19
4
4975
4741
33
MMG
DOW RK
16
0822/19
3
6035
5588
40
MMG
DOME RK
16
0622/79
2
7059
6391
37
MMG
SO RK
24
0622119
1
7884
7043
40
KGB2
OW RK
0
0427/05
9616'
9660'
3 9.5WX 7'BKRG2ZXPLTP,
wl FMC LNR HGR D= 6.30'
MLLOUI` WNDOW (:F 34=7483'-75W
P A_tn•FFSYI,�n=i atT
FES X
HES XN
" X S BKR ZXP LTP
v/ HMO LNR HGR D = 4.42'
i' X 4-12• XO, D= 3.950'
LTPw/NS PfSA (06116119)
DEPLOY SLV, D = 3.00'
X W. D=
/16/19) 10205' '
M TOP, ^10205' MLLOUT WINDOW (F -34C) 10208' - 10217-
=285-
0217'=285' 11203' 11203' 3-3/16' X 2-7/8- XO, tD = 2.377'
PERFORATION SUMMARY
RET LOG: ON 06/11/19
ANGLEAT TOP PUiF: 90" @ 11463'
Note: Refer to Prodwfion DB for historical perf data
SIZE I SPF I INTERVAL I OPNSgz I SHOT SOZ
2'6 11463 - 11650 O
2' 6 11750 - 12850 O
STL, .0058 bpf, D =
DATE REV BY COWAABN 5
DATE I REV BY I COMMENTS
102389 ORIGNAL COMPLETION
4Ii9 CJIWJMD GLV (70(06118/19)
07108196 SRB SIDEMCK(F34A)
4/19 KR'JMD TREECIO
0413OMS N2ES SIOURACK(F346)
0627119 JNUJMD ADDED REE & OF ELEV
06113118 N-CDR2 CTD ST (F -W)
0627/19 JPK/JMO GLV (YO (0622/19)
06119/19 JMD DR -G HO CORRECTIONS
06/24/19 CJFYJMO SET LTPw /PISA & X NIPPLE
PRUDHOE BAY LM
WELL: F -34C
FERMI No: 205-053
AR No: 50-029-21980-03
SEC 2, T1 IN, R13F- 2133' FW & 2413 FW -
BP Exploration (Alaska)
North America - ALASKA - BP
Operation Summary Report
Page 1 of 15
Common Well Name: F-34
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date:
5/28/2019
End Date. 6/7/2019
%3-019CT-C: (2,401,556.00)
Project: PBU
Site: F
Rig Name/No.: CDR -2
Spud Date7Time: 10!7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor NABORSALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Dale From - To
Him
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
_ (usft) _
5/28/2019 16:00 -
19:00
3.00
MOB
P
PRE
PJSM FOR MOVING OFF WELL
- VERIFY 1T' x 12" WHEEL CHOCK IN PLACE
PRIOR TO MOVING OFF WELL
- RADIO COMMUNICATION WILL BE VERIFIED
PRIOR TO MOVING OFF WELL
- DRILLER / RIG MANAGER WILLASSIGN
SPOTTER LOCATIONS PRIOR TO MOVING
OFF WELL
- AGREEMENT WILL BE MADE ON WHAT THE
COMMAND FOR "STOP" WILL BE PRIOR TO
MOVING OFF WELL.
'- ALL INVOLVED WILL BE MADEAWARE OF
NO TWC INSTALLED.
JACK UP AND MOVE PITS. MOVE SUB OFF
ALSO
19:00 -
19:30
0.50
MOB
P
PRE
PERFORM TEST RUN WITH WALKING FOOT.
GOOD TEST _
19:30
20'00
0.50
MOB
P
PRE
INSTALL BOTH JEEPS.
ATTACHED TRUCKING. PEAKHASTOSWAP
'.TRUCK
2000 -
21:30
1.50
MOB
N
PRE
WAIT ON TRUCKING
21:30 -
00:00
2.50
MOB
P
PRE
i MOVE RIG TO F -PAD
5/29/2019 00:00 -
00:30
0.50
MOB
P
PRE
RIG ARRIVED LOCATION
0030 -
0400
3.50,
MOB—
P
PRE
PRE JOB SAFETY MEETING WITH CREWAND
TRUCK DRIVERS.
- EMPHASIS ON GOOD COMMUNICATION,
VERIFY STOP COMMAND.
- STOP BLOCK IN PLACE TO PREVENT RIG
FROM ROLLING BACKWARDS INTO WELL.
- VALVES ON TREE SHUT IN AND ALL
ANNULUS PRESSURES LESS THAN 50 PSI.
- DRILL SITE OPERATOR NOTIFIED AND
DECLINED WITNESSING RIG MOVE OVER
WELL.
- ANYONE CAN STOP THE JOB AT
ANYTIME.BE WATCHFUL
- SPOT MAIN & PIT SUBS
"RIG ACCEPTED AT 04:00"'
0400 -
1400
10.00
MOB
P
PRE
RIG UP CHECK LISTS
- LTT BETWEEN SWAB AND MASTER TO
3500# PASSED
- REMOVE TREE CAPAND NU ROPE AND MPL
- STAB INJECTOR, CHECK TREE BOLTS AND
SERVICE SWAB AND TANGO VALVES
- FLUID PACK COIL WITH 15 BELS OF
METHANOL FOR THE TRIP IN THE HOLE
_- CONDUCT PJSM_FOR TESTING BOPS
14.00 -
15:00
1.00
BOPSUR
P
PRE
LINE UP VALVES AND PUMP AND PURGE AIR
FROM SYSTEM.
CONDUCT SHELL TEST OF BOPS.
15.00 -
15:30
_
0.50
BOPSUR
P
PRE
CONDUCT RIG EVAC DRILLAND AAR WITH
BEARD CREW.
CONDUCT PRE -SPUD.
1530 -
1700
1.50
BOPSUR
P
PRE
LINE UP VALVES FOR BOP TEST #1.
Printed 8/25/2019 10:04:59AM ••All depths reported in Drillers Depths"
Common Well Name: F-34
Event Type: RE-ENTER- ONSHORE (RON)
Project: PBU
North America - ALASKA - BP Page 2 of 15
Operation Summary Report
- AFE No
Start Date. 5/28/2019 End Dale: 6!//2019 X3-019CT-C (2,401,556.00 )
Site: F
Spud Date/Time: 10/7
Rig Contractor. NABORSALASKA DRILLING INC.
Active datum: KB ®64.38usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
(hr) _. _ (usfl)
17:00 - 23:00 6.00 BOPSUR P
2300
- 00'.00
1.00
RIGID
P
5/30/2019 00:00
- 01:30
1.50
RIGID
P
j
01:30
- 02:00
0.50
RIGID
P
0200
1.00
STWHIP
P
- 0300
03:00 - 06:30 3.50 STWHIP P
06:30 - 1000 3.50 STWHIP P
Rig Release: 6/13/2019
BPUOI: USA00000752
Phase Description of Operations
PRE TEST ROPE AS PER AOGCC AND BP
GUIDELINES.
ALL TESTS TO 250 13500 PSI.
TEST IS WITNESSED BY AOGCC REP ADAM
EARL, WSLAND TOOLPUSHER.
TEST 1: IRV, STRIPPER, C9, C10
BACKWARDS -PASS
TEST 2: BLIND/ SHEARS, R1, BL1A, B1, B4
Rl FAILED. MOVE ON TO TEST LATER
TEST 3: ANNULAR (2-3/8"), TIW#1, 33, B2,
SO PASS
TEST 4: UPPER 2-3/8" PIPE /SUP, TIW #Y,
BL2, R2, T2, C15 PASS
TEST 5: C15, T1, C11 PASS
TEST 6: VARIABLES (2-3/8'1, C7, C9, C70, TV2
PASS
TEST 7: LOWER 2-3/8" PIPE / SLIP, C5, C6, C8,
'TW PASS RETEST Rl AFTER GREASE/
CYCLE. FAIL/PASS
TEST 8: CHOKE A, CHOKE C PASS
PERFORM ACCUMULATOR DRAW DOWN
TEST
INSTALL SAVER SUB
TEST 9: ANNULAR (3-1/2") C1, C4 PASS
ANNULAR FAIL/ PASS
TEST 10: VARIABLES (3-1/2") C2, C_3 PASS
PRE PULL TEST JOINT. REMOVE TEST RISERS
MAKE UP DRILLING RISERS. INSTALLING
FLOATS IN UOC
PRE INSTALL FLOATS
STAB INJECTOR ON TO WELL
PRESSURE TEST FLOATS AND DRILLING
_ LUBRICATORS TO 3500#.
PRE PRE SPUD WITH WARDS CREW
DETAILED DISCUSSION AROUND Hi
_ PROCEDURE WITH WARDS CREW.
WEXIT OPEN WELLBORE UP AGAINST CLOSED
CHOKE. FLOW CHECK
MAKEUP WINDOW MILLING BHA WHILE
FLOW CHECKING WELLBORE. WELL STATIC
RUN BHA#1 IN HOLE. MAKE UP INJECTOR.
INJECTOR ON: 02:45
WEXIT RIH WITH 3.80° WINDOW MILLING BHA#1
- RATE: 0.39 BPM IN, 0.63 BPM OUT. CIRC
PRESSURE: 113 PSI
- MUD WEIGHT: 8.31 PPG IN, 7.37 PPG OUT.
TAKING INITIAL ENTRY FLUIDS TO TIGER
TANK
- GR TIE IN TO HOT FOR OUR TOOLS. PU TO
9,200'. SWAP TO CCL MODE.
- LOG CCL DOWN TO LIGHT TAG WHIPSTOCK
AT 10225'UNCORRECTED.
WEXIT PICK UP OFF WHIPSTOCKAND CIRCULATE
WELL TO KCL THEN TO MUD.
TIE-IN CCL LOG WHILE CIRCULATING.
CORRECT -16 FT.
Printed 6/25/2019 10: 04 59A **All depths reported in Drillers Depths"
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 3 of 15
Operation Summary Report
Common Well Name: F-34
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 5/28/2019 End Date: 6/7/2019
X3-019CT-C: (2,401,556.00 )
Project: PBU
Site: F
_
Rig Name/No.: CDR-2
Spud Date/Time'. 10/7/1989 12:00:OOAM
Pog Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38us8 (above Mean Sea Level)
Date From -To
Him Task Code NPT Total Depth Phase
Description of Operations
(hr) (USM_
66
10:00 - 1030
_
0.50 STWHIP P WEXIT
WITH MUD AT SURFACE, PURGE CT RISER
OUT TO TIGER TANK THEN BRING RETURNS
BACK TO PITS.
CLOSE EDC, 10 MIN FLOW CHECK IS GOOD.
GO TO FULL RATE, EASE DOWN FOR LIGHT
TAG AT PINCH POINT.
10:30 - 1230
2.00 STWHIP P WEXIT
MILL 3.80' WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 10208.35' MD TO 10210.2'
MD
- RATE: 2.86 BPM IN, 2.87 BPM OUT
- MUD WEIGHT: 8.71 PPG IN, 8.61 PPG OUT
''. - DWOB: 1 - 3 KLBS
-'.CIRC PRESSURE: 3380 PSI
12:30 - 14:50
2.33 STWHIP P WEXIT
MILL 3.80° WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 10210.2' MD TO 10211.4'
SMD
- DROP RATE TO 2.5 BPM DUE TO VIBRATION
- RATE: 2.51 BPM IN, 2.52 BPM OUT
- MUD WEIGHT: 8.69 PPG IN, 8.61 PPG OUT
- DWOB: 34 KLBS
- CIRC PRESSURE: 3180 PSI
- BLEED OA FROM 800 TO 200 PSI.
14:50 - 1800
3.17 STWHIP P WEXIT
MILL 3.80"WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 10211.4' MD TO 102)(X' MD
- DROP RATE TO 2.3 BPM DUE TO VIBRATION
- RATE: 2.31 BPM IN, 2.32 BPM OUT
- MUD WEIGHT. 8.69 PPG IN, 8.60 PPG OUT
- DWOB: 34 KLBS
-CIRC PRESSURE: 2870 PSI
- MOVE RATE BACK UP TO 2.5 BPM WHEN
VIBRATION LEVELS FALL ENOUGH.
1800 - OOt00
6.00 STWHIP P 10,216.43 WEXIT
MILL 3.80`WINDOWIN 4-1/2" CASING PER
BAKER REP
- MANIPULATE RATES BETWEEN 2.4-2.8 BPM
TOATTEMPTTO MINIMIZE VIBRATION
- RATE: 2.78 BPM IN, 2.80 BPM OUT
- MUD WEIGHT: 8.69 PPG IN, 8.60 PPG OUT
- DWOB: 4 KLBS
- CIRC PRESSURE: 3337 PSI
- VIBRATIONS RUNNING IN THE 2'S
-JUST PRIOR TO MIDPOINT, BEGIN HAVING
TO PLAY WITH RATES TO KEEP IN THE 3'S
- WOB CARRYING AT 4-4.2K
5/31/2019 00:00 - 00:30
0.50 STWHIP P 10,21643 WEXIT
WINDOW MILL EXITED
00:30 - 03:30
3.00 STWHIP P 10,227.00 WEXIT
MILL 3.80° WINDOW IN 4-1/2" CASING
- RATE: 2.54 BPM IN, 2.54 BPM OUT
- MUD WEIGHT: 8.68 PPG IN, 8.59 PPG OUT
-DWOB: 34 KLBS
-CIRC PRESSURE: 3111 PSI
- DRILL RATHO_LE TO 10227'. LET DRILL OFF
03:30 - 04:00
0.50 STWHIP P 10,227.00 WEXIT
REAMING PASSES
- REAMING PASSES SHOWED MINIMAL
MOTOR WORK. CLEAN PASSES.
-COMEOFFLINE. DRY DRIFT WINDOW TO
TD, NO ISSUES
-PAINT YELLOW FLAG AT 10206' (10147.29-
10147.29'EDP)
EDP)
OPEN EDC
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
Common Well Name: F-34
Event Type: RE-ENTER- ONSHORE(RON)
North America - ALASKA - B la Page 4 of 15
Operation Summary Report
Start Date: 5/28/2019 End Date 6/7/2019
AFE No
X3-019CT-C: (2,401,558.00 )
Project: PBU Site: F
Rig Name/No.. CDR -2 Spud Date/Time: 10/7/1989 12:00.00AM Rig Release: 6/13/2019
Rig Contractor NABORSALASKA DRILLING INC.
Active datum: KB @64.38usR (above Mean Sea Level)
FOR 5 MINUTES, GOOD
INJECTOR ON: 09:20
BPUOI: USA00000752
Date From - To His
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
- LOG CCL DOWN FOR TIE-IN FROM 9970' TO
_ (usft) _
~10,227.00
_
04:00 - 05:00 1.00
STWHIP
P
10,227.00
WEXIT
MONITOR WELL FOR 10 MINUTES: STATIC
DISCUSS WITH ODE AND USE FLAG DEPTH
INSTEAD.
RIH TO FLAG AND CORRECT -20.8'. FIND
- FINGERPRINT FLOW USING 8OZ
BOTTOM AT 10226' WITHIN 0.8' OF DRILLED
RATHOLE DEPTH YESTERDAY.
DRILL 4.25" BUILD FROM 10226' MD TO 10239'
MEASURING DEVICE TIME TO FILL IS
MD
- FREE SPIN: 3500 PSI, 2.85 BPM
- RATE: 2.84 BPM IN, 2.86 BPM OUT. CIRC
TRENDING DOWN FROM 22 SEC TO WELL
PRESSURE: 3500-3800 PSI
- MUD WEIGHT: 8.71 PPG IN, 8.61 PPG OUT,
ECD: 10.28 PPG
OVER 3MIN
j
1400 - 1630 2.50 DRILL N 10,227.00
PROD1 SHAKER ISN'T WORKING PROPERLY__
PULLABOVE WINDOWAND PUMP B/U
- DISCUSS WITH CTD SUPERINTENDENT.
BEFORE TROUBLESHOOTING.
_
TROUBLESHOOT SHAKER.
DOWN_WARDT_REND. POOH
05:00 - 07:30 2.50
STWHIP
P
WEXIT
'POOH
WINDOW.
- MUD WEIGHT: 8.69 PPG IN, 8.61 PPG OUT
- RATE: 3.40 BPM IN, 3.22 BPM OUT
07:30 - 09:00 1.50
STWHIP
P
10,227.00
WEXIT
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
I- CLOSE EDC, POWER DOWN
- INJECTOR OFF: 08:00
- INSPECT LAST 50' OF CT, NO WEAR SPOTS
SEEN.
- MILL IS 3.79" GO, 3.78" NO-GO.
REAMER IS 3_.80", 3.79" N_ O -GO. _
09:00 - 09:30 0.50
DRILL
P
10,227.00
PROD1
MAKEUP 4.25" DRILLING BHA #2
- PICK UP 2-7/8" ULS MOTOR (2.75 DEGAKO)
AND 3" COILTRAK TOOLS
- MAKE UP 3.75 X 4.25' HYC BICENTER BIT
- SURFACE TESTED COILTRAK TOOL. GOOD
TEST.
- PRESSURE TEST OTS TO 3500 PSI HIGH
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths`•
FOR 5 MINUTES, GOOD
INJECTOR ON: 09:20
0930 - 1230 3.00 DRILL P I 10,227.00
PRODi RIH WITH 4.25" DRILLING BHA#2
- RATE: 0.50 BPM IN, 0.80 BPM OUT. CIRC
PRESSURE: 1300 PSI
- MUD WEIGHT: 8.64 PPG IN, 8.61 PPG OUT
- LOG CCL DOWN FOR TIE-IN FROM 9970' TO
~10,227.00
1230 - 1400 1.50 DRILL P
PROD1 CCL LOG DOES NOT HAVE CLEAR ENOUGH
FEATURES TO TIE-IN.
DISCUSS WITH ODE AND USE FLAG DEPTH
INSTEAD.
RIH TO FLAG AND CORRECT -20.8'. FIND
BOTTOM AT 10226' WITHIN 0.8' OF DRILLED
RATHOLE DEPTH YESTERDAY.
DRILL 4.25" BUILD FROM 10226' MD TO 10239'
MD
- FREE SPIN: 3500 PSI, 2.85 BPM
- RATE: 2.84 BPM IN, 2.86 BPM OUT. CIRC
PRESSURE: 3500-3800 PSI
- MUD WEIGHT: 8.71 PPG IN, 8.61 PPG OUT,
ECD: 10.28 PPG
-ROP: 20-60 FT/HR, WOB: 1-2 KLBS_
1400 - 1630 2.50 DRILL N 10,227.00
PROD1 SHAKER ISN'T WORKING PROPERLY__
PULLABOVE WINDOWAND PUMP B/U
BEFORE TROUBLESHOOTING.
AFTER B/U, SHUT IN WELLAND
TROUBLESHOOT SHAKER.
FINDA BAD RELAY IN THE PANEL, SHAKER
MOTORS ARE OK.
OPEN UP WELLAND RUN BACK THROUGH
WINDOW.
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths`•
North America - ALASKA - BP Page 5 of 15
Operation Summary Report
Common Well Name. F-34
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 5/28/2019 Eno Date'. 6/7/2019
X3-019CT-C'. (2,401,556 00 )
Project: PBU Site: F
Phase
Rig Name/No.: CDR -2 Spud Date/Time: 10/7/1989 12:00 OOAM
Rig Release: 6/13/2019
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usR (above Mean Sea Level)
Date From - To
His
Task
Code
NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
---
18:30
- 20:30
4 .00
DRILL
P
10,334.00
PROD?
DRILL 4.25" BUILD FROM 10239'MD TO 10334'
MD
- FREE SPIN: 3390 PSI, 2.87 BPM
- RATE: 2.87 BPM IN, 2.90 BPM OUT. CIRC
PRESSURE: 3370-3800 PSI
- MUD WEIGHT: 8.71 PPG IN, 8.62 PPG OUT,
ECD: 10.11 PPG AT WINDOW ON OPEN
CHOKE
-ROP: 20-60 FT/HR, WOB: 34 KLBS
20:30
- 21:00
0.50
DRILL
P
10,334.00
PROD1
BUILD RATE SHOWING 35.1' CALLODE.
DISCUSS WITH ACTING SUPT.
- WILL BE ABLE TO GET TO PLAN WITH
LATERAL BHA.
21:00
- 23:30
2.50
DRILL
P
10,334.00
PROD1
MONITOR WELL FOR 10 MIN. WELL STATIC
- 3.00 BPM RATE IN / 2.85 BPM RATE OUT
PPG IN/6.85 PPG OUT
PAINT WHITE FLAG AT 10182.95' (10103.45'
EDP) _
2330
- 0000
0.50
DRILL
P
10,334.00
PROD1
PERFORM 10 MIN FLOWCHECK. STATIC
CREW HANDOVER. PJSM FOR LAYING BHA
DOWN
INJECTOR OFF: 00:00
6/1/2019 00:00
- 00:30
0.50
DRILL
P
10,334.00
PROD1
'LAY DOWN BHA
00:30
- O1:00
0.50
DRILL
P
10,334.00
PRODt
PERFORM FUNCTION TEST ON BOPE
01:00
- 01:30
0.50
DRILL
P
10,334.00
PROD1
MAKEUP 4-1/4" DRILLING BHA#3
-PICK UP 2-7/8" ULS (1.1 DEG AKO)AND 3.0"
COILTRAKTOOLS
- MAKE UP 4-1/4" HYCALOG SRF13211 M -E2
BICENTER BIT
- SURFACE TESTED COIL TRAK TOOL. GOOD
TEST.
- PRESSURE TEST OTS FOR 5 MINUTES AT
3500#
- INJECTOR ON: 01:15
GOOD SHALLOW TEST OF AGITATOR.
- 2.2 BPM (724 PSI DIFF)
- 2.46 BPM ( 1055 PSI DIFF)
- 2.69 BPM (1138 PSI DIFF)
- 2.86 BPM (1390 PSI DIFF)
01:30
- 04:00
2.50
DRILL
P
10,334.00
PROO1
RIH WITH 4-1/4" DRILLING BHA#3
- RATE: 0.50 BPM IN, 1.0 BPM OUT. CIRC
PRESSURE: 1036 PSI
- MUD WEIGHT: 8.66 PPG IN, 8.64 PPG OUT
-DRIVE BY FLAG WITH A-21.5
- LOG DOWN FOR TIE-IN FROM 10250' TO
10299" MD (FORMATION) WITH -22
_CORRECTION
04:00
- 12:00
8.00
DRILL
P
10,334.00
PROD1
DRILL 4-1/4" LATERAL 7O 10590'
-FREE SPIN: 4160 PSI, 2.68 BPM
- RATE: 2.67 BPM IN, 2.73 BPM OUT. CIRC
PRESSURE: 4160 - 4330 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.62 PPG OUT,
ECD: 10.27 PPG
- ROP: 60 FT/HR, WOB: 2.5 -4.2 KLBS
Printed 6/25/2019 10:04'.59AM `•All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 6 of 15
Common Well Name: F-34
- 23:00
0.50
AFF No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/28/2019
End Data 6/7/2019
X3-019CT-C: (2,401,556.00 )
Project: PBU
Site: F
ECD: 10.14 PPG AT WINDOW
Rig Name/No.: CDR -2
Spud Date7Fime: 10!7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor. NABORSALASKA DRILLING INC.
-AT 10630' PULL 150' WIPER TRIP. CLEAN
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
-AT 10665'PUMP S BBLS LO/HI VIS SWEEPS.
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft)
TO PREP FOR LONG WIPER.
12_00 - 17:00 5.00
DRILL P
10 749.00 PROD1
DRILL 4.25" LATERAL FROM 10590' MD TO
17:00 - 19:30 2.50 DRILL
IF
1930 - 2230 300 DRILL P
22:30
- 23:00
0.50
DRILL P
23:00
- 00:00
1.00
DRILL P
6/2/2019 00:00 - 01:30 1.50 DRILL P
Printed 6/252019 10:04:59AM "All depths reported in Drillers Depths"
10749' MD
- FREE SPIN: 4100 PSI, 2.63 BPM
- RATE: 2.65 BPM IN, 2.67 BPM OUT. CIRC
PRESSURE: 4100-4290 PSI
- MUD WEIGHT: 8.83 PPG IN, 8.71 PPG OUT,
ECD: 10.14 PPG AT WINDOW
-ROP: 20-50 FT/HR, WOB: 3-4 KLBS
- AT 10590' PUMP 5 BBLS LO / HI VIS SWEEPS.
-AT 10630' PULL 150' WIPER TRIP. CLEAN
PASS UP AND DOWN.
-AT 10665'PUMP S BBLS LO/HI VIS SWEEPS.
i- CONDUCT FREQUENT PICKUPS WHENEVER
DRILLING SLOWS.
- AT 10740' PUMP 5 BBLS LO / HI VIS SWEEP
TO PREP FOR LONG WIPER.
CALL FOR TRUCKS FOR MUD SWAP.
10 749.00
PROD1 DRILL TO 10749' AND TRY TO PICK UP, CAN'T.
STILL ABLE TO ORIENT AND PUMP.
CLEAR OPEN HOLE VOLUME THEN SHUT
DOWN PUMP, RELAX HOLE FOR 5 MIN.
CYCLE PUMP 3 TIMES 20K TO 86K, NO
-MOVEMENT.
-BUILD SPACERS FOR PUMPING MINERAL OIL.
CONDUCT PJSM WITH MUD ENGINEER AND
PIT WATCHER.
PUMP 10 BBLS KCL WATER, 20 BBLS LVF, 10
BBLS KCL WATER.
SPOT 6 BBLS OUT, PULL 65K AND POP FREE.
PICK UP AND CIRC OIL AND SPACERS OUT TO
TIGER TANK.
10,749.00
PROD1 WIPER TRIP TO JET 7" AND TANGENT
SECTION.
PULL THROUGH WINDOW AND PERFORM 50'
JOG THEN OPEN EDC.
WIPER UP TO 7500'. RIH TO WINDOW.
CLOSE EDC _
10,749.00
PROD1 LOG DOWN FOR TIE-IN FROM 10240' 70
10267' MD (FORMATION WITH -12'
CORRECTION _
10,785.00
PROD? DRILL 4-1/4" LATERAL
- FREE SPIN: 4155 PSI, 2.72 BPM
- RATE: 2.72 BPM IN, 2.72 BPM OUT. CIRC
PRESSURE: 4130-4340 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.73 PPG OUT,
ECD: 10.33 PPG
_ - ROP: 58 FT/HR, WOB: 2.6KLBS _
10,825.00
PROD1 DRILL 4-1/4' LATERAL
- FREE SPIN: 4155 PSI, 2.72 BPM
- RATE: 2.72 BPM IN, 2.72 BPM OUT. CIRC
PRESSURE: 4130-4340 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.73 PPG OUT,
ECD: 10.33 PPG
- ROP: 58 FT/HR, WOB: 2.6KLBS
-PRESSURE INCREASING, HAVINGTO
DROP RATE BACK. START NEW MUD DOWN
COIL
Printed 6/252019 10:04:59AM "All depths reported in Drillers Depths"
07'.30 - 0900 1.50 DRILL N
09:00 - 12:00 3.00 DRILL P
1200 - 2030 8.50 DRILL P
2030 - 2300 2.50 DRILL P
BHA WIPERS AS NEEDED.
North America - ALASKA - BP
Page 7 of 15
PROD1 WORK STUCK PIPE
Operation Summary Report
-PULLED TO 1 X TO BOK
Common Well Name: F-34
-SLACK OFF TO NEUTRAL SHUT DOWN
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/28/2019 End Date: 6f7/2019
X3-019CT-C: (2,401,556.00 )
Project: PBU
Site: F
Rig Name/No.: CDR -2
Spud Date/Time: 10M1989 12:00 OOAM
Rig Release: 8/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
-2.6 BPM IN AND OUT 4219 PSI
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr)
_ (usft)_ _
11,078.00
01:30 - 0730 8.00
DRILL P 11,078.00 PROD?
DRILL 4-1/4" LATERAL "SWAPPING TO NEW
-PUMP SPACERS AND MOB ABOVE BHA
MUD"
-POH AT 2.81N / OUT 3800 PSI 30 FPH
- FREE SPIN: 3540 PSI, 2.85 BPM
TANK
- RATE: 2.83 BPM IN, 2.83 BPM OUT. CIRC
-OPEN EDC AND JET SLIDE
PRESSURE: 3540-3807 PSI
-RIH CLOSE EDC ABOVE WINDOW
- MUD WEIGHT: 8.64 PPG IN, 8.55 PPG OUT,
- TIE IN DEPTH CORRECT •8'.
ECD: 9.98 PPG
11,269.00
PRODi DRILL 4-1/4" LATERAL FROM 11078'to 11269
- ROP: 50-80 FT/HR, WOB: 2-3 KLBS
07'.30 - 0900 1.50 DRILL N
09:00 - 12:00 3.00 DRILL P
1200 - 2030 8.50 DRILL P
2030 - 2300 2.50 DRILL P
BHA WIPERS AS NEEDED.
Printed 8125/2019 10:04:59AM ••AII depths reported in Drillers Depths"
_ _-DIFFERENTIALLY STUCKAT 11078'M_D___
11,07&00
PROD1 WORK STUCK PIPE
-PULLED TO 1 X TO BOK
-SLACK OFF TO NEUTRAL SHUT DOWN
PUMPS AND RELAX PIPE,
-CHANGE TOOLFACE, ORIENTER FREE
-PULLED TO MAX BOK
-SLACK OFF TO NEUTRAL, BUILD SPACER
PILL
-2.6 BPM IN AND OUT 4219 PSI
-PUMP 10 BBLS KCL SPACER, 20 BELS. OF
MOB, 10 BBLS KCL SPACER
-DISPLACE B BBL OUT
-PIPE FREE WITH 60K
11,078.00
PRODt WIPER TRIP FROM 11078 TO ABOVE 7'
CASING SECTION AT 8000' MD
-PUMP SPACERS AND MOB ABOVE BHA
-POH AT 2.81N / OUT 3800 PSI 30 FPH
-DISPLACE KCLAND MOB PILLS TO TIGER
TANK
-OPEN EDC AND JET SLIDE
-3.18PM IN / 3.0 OUT 2680 PSI
-RIH CLOSE EDC ABOVE WINDOW
- TIE IN DEPTH CORRECT •8'.
__- CLEAN PASS TO BOTTOM _
11,269.00
PRODi DRILL 4-1/4" LATERAL FROM 11078'to 11269
-FREE SPIN: 4050 PSI, 2.78 BPM
- RATE: 2.78 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 4030 - 4300 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.56 PPG OUT,
ECD: 9.73 PPG AT WINDOW
- ROP: 20 - 50 FT/HR, WOB: 3 - 4.5 KLBS
- SHORT WIPER TRIP FROM 11130'.
- CONDUCT FREQUENT SHORT PICKUPS
WHENEVER DWOB OR DIFFERENTIAL
PRESSURE DRILLS OFF.
-AT 11185' PUMP 5 BBLS LO / HI VIS SWEEPS.
-AT 11209' PULL 150' WIPER, CLEAN PASS UP
AND DOWN.
- AT 11250' PUMP 5 BBLS LO / HI VIS SWEEPS.
11,350.00
PROD1 DRILL 4-1/4' LATERAL
- FREE SPIN: 4042 PSI, 2.59 BPM
- RATE: 2.59 BPM IN, 2.64 BPM OUT. CIRC
PRESSURE: 4042-4340 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.73 PPG OUT,
ECD: 10.35 PPG
- ROP: 45 FT/HR, WOB: 2.8 KLBS
- INCREASE LUBES TO 3.0%. THIN MUD WITH
70 BBLS LOVIS TO COMBAT ECD AND PUMP
PRESSURE
Printed 8125/2019 10:04:59AM ••AII depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. F-34
Phase Description of Operations
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 512812019
Project: PBU
Site: F
Rig Name/No.: CDR -2
Spud Date/Time. 1017/1969
Rig Contractor. NABORS ALASKA DRILLING INC.
- RATE: 2.79 BPM IN, 2.79 BPM OUT. CIRC
Active datum: KB 064.38usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
- _.. (hr)
23:00_ -_ 00:00 1.00
DRILL P
6/3/2019 100:00 - 02:30 2.50 DRILL P
Page 8 of 15 1
AFE No
End Date: 6/7/2019 X3-019CT-C:(2,401,556.001
BPUOI: USA00000752
Total Depth
Phase Description of Operations
(usft)
- RATE: 2.82 BPM IN, 2.61 BPM OUT. CIRC
11,383.00
PROD? DRILL 4-1/4' LATERAL
- FREE SPIN: 4150 PSI, 2.79 BPM
- RATE: 2.79 BPM IN, 2.79 BPM OUT. CIRC
PRESSURE: 4150-4340 PSI
-MUD WEIGHT: 8.75 PPG IN, 8.65 PPG OUT,
ECD: 10.17 PPG
- ROP: 45 FT/HR, WOB: 2.6 KLBS_
11,500.00
PROW DRILL 4-1/4' LATERAL
- FREE SPIN: 4150 PSI, 2.65 BPM
- RATE: 2.65 BPM IN, 2.65 BPM OUT. CIRC
PRESSURE: 4150-4450 PSI
- MUD WEIGHT: 8.77 PPG IN, 8.69 PPG OUT,
ECD: 10.20 PPG
- ROP: 45-70 FT/HR, WOB: 2-3.5KLBS
-APPEARS WE CROSSED FAULTAT 11413'
- DRILLED 7011,500'
0230 - 0720 4.83 DRILL P 11,500.00
PROD1 PERFORM LONG WIPER TRIP TO WINDOW
- RATE: 2.82 BPM IN, 2.61 BPM OUT. CIRC
PRESSURE: 4081 PSI
- PERFORM JOG AT WINDOW. PULL
THROUGH WINDOW.
-OPEN EDC, JET UP THROUGH 7" AND
TANGENT SECTION.
- 3.72 BPM RATE IN 13.58 BPM RATE OUT
- SHALE PIECES COMING ACROSS SHAKER
FROM JETTING 7". ROUNDED. APPEARS
THEY HAVE BEEN ROLLING AROUND IN
WELLBORE. MAKE SECOND PASS ACROSS
7"- SHAKER CLEANED UP
-TIE-IN DEPTH, CORRECT+6'.
CLOSE EDC AND PASS WINDOW.
RIH TO BOTTOM.
SET DOWN AT 10523', CHANGE TOOLFACE
AND NOTHING SEEN.
CONTINUE RIH TO BOTTOM.
07:20 - 09:00 1.67 DRILL P 11,571.00
PROW DRILL 4-1/4° LATERAL FROM 11500 TO 11571'
- FREE SPIN: 4100 PSI, 2.60 BPM
- RATE: 2.60 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 4150-4400 PSI
- MUD WEIGHT: 8.71 PPG IN, 8.69 PPG OUT,
ECD: 10.06 PPG AT WINDOW.
- ROP: 45-70 FT/HR, WOB: 2-3.5KLBS
09:00 - 10:30 1.50 DRILL N 11,571.00
PROD1 TRY TO PICKUP AT 11571'AND CAN'T,
DIFFERENTIALLY STUCK
SHUT DOWN PUMP AND RELAX HOLE.
CYCLE PIPE 20K TO 90K TWO TIMES, NO
MOVEMENT.
HOLD PIPE AT 50K AND BUILD SPACERS.
PUMP 10 BBLS KCL WATER, 20 BBLS LVT, 10
BBLS KCL WATER.
WITH 8 BBLS OUT CYCLE PIPE 1 OK TO 75K,
PIPE IS FREE.
PICK UPAND CIRCULATE LVT OUT TO TIGER
TANK.
Printed 625/2019 10:04:59AM **All depths reported In Drillers Depths"
North America - ALASKA - BP Page 9 of 15
Operation Summary Report
Common Well Name: F-34
0000
- 03:00
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date 5/28/2019
End Date 6/7/2019
X3-019CT-C (2,401 556 00 )
Project: PBU
Site: F
Rig Name/No.: CDR -2
Spud Date/Time: 10/7/1989 12:00.00AM
Rig Release: 8/13/2018
Rig Contractor: NABORS ALASKA DRILLING INC.
SPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_ (usft)
_
10:30 - 17:00 6.50
_
DRILL P
11,790.00 PROD1
CONTINUE DRILLING WHILE CIRCULATING
17:00 - 17:30 0.50
17:30 - 20:30 3.00
2030. - 00'.00 3.50
6/4/2019
0000
- 03:00
3.00
03:00
- 03:00
0.00
LVT OUT TO TIGER TANK.
DRILL 4-1/4' LATERAL FROM 11571 TO 11790'
- FREE SPIN: 3900 PSI, 2.74 BPM
- RATE: 2.74 BPM IN, 2.76 BPM OUT. CIRC
PRESSURE: 3950-4400 PSI
- MUD WEIGHT: 8.79 PPG IN, 8.65 PPG OUT,
ECD: 9.18 PPG AT WINDOW WHILE LVT IS IN
THEANNULUS.
- ROP: 50 -120 FT/HR, WOB: 2-3.5KLBS
- CONDUCT FREQUENT PICKUPS WHENEVER
DWOB OR DIFFERENTIAL PRESSURE DRILLS
OFF. GETTING HARD TO TURNAROUND ON
PICKUPS.
-AT 11650' PULL 150' WIPER TRIP. CLEAN
PASS UP AND DOWN.
- AT 11750' PUMP S BBLS LO VIS SWEEP. _
DRILL P 11,790.00 PROD? RESTART ORION ACQUISITION SYSTEM.
PULL SHORT WIPER WHILE REGAINING
MONITORING SYSTEM.
DRILL P 11,913.00 PRODI DRILL 4-1/4" LATERAL FROM 11790'TO 11913'
DRILL P
DRILL P
DRILL P
- FREE SPIN: 4070 PSI, 2.65 BPM
- RATE: 2.65 BPM IN, 2.64 BPM OUT. CIRC
PRESSURE: 4070- 4336 PSI
- MUD WEIGHT: 8.87 PPG IN, 8.77 PPG OUT,
ECD: 9.87 PPG AT WINDOW.
- ROP: 50 - 80 FT/HR, WOB: 2 - 4 KLBS
- HAVING TO PICK UP EVERY COUPLE FEET.
TRANSFER BECOMING AN ISSUE.
- PULLED 77K OFF BOTTOM. PERFORM
LONG WIPER
11913.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 11 913'MD TO 7500' MD
- RATE: 2.84 BPM IN, 2.65 BPM OUT. CIRC
PRESSURE: 4171 PSI.
- PERFORM 300' JOG AT BELOW WINDOW
- PULLED HEAVY AT WINDOW -2.5. RIH FREE.
- BRING MOTOR UP TO DRILLING RATE.
SLOW RATE JUST BELOW WINDOW
- PULLED THROUGH TIGHT UP THROUGH
WINDOW.
-OPEN EDC. JET DOWN ACROSS TRAY. JET
UP THROUGH 4-1/2" WHILE SLOWING RATE
DOWN THROUGH 7" AREA
11,913.00 PROD1 CONTINUE JETTING UP THROUGH LINER AND
SLOW FOR THE 7" CASING.
CHASE UP TO 7500'. RIH AND FLUSH BHA.
SIGNIFICANT AMOUNT OF SHALE COMING
ACROSS SHAKER.
CONTINUE TO CIRCULATE WELL CLEAN.
SHUBLIK PER GEO. ASSUMING THETWO
OVERPULLS AT 11175' ANO 11125' WERE THE
SOURCE OF THE SHALE. RUN BACK TO
WINDOW
11,913.00 PROD? - LOG DOWN FOR TIE-IN FROM 10,240 TO
10266' MD (FORMATION) WITH +12'
CORRECTION
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths"
Common Well Name. F-34
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
Rig
North America - ALASKA- BP
Operation Summary Report
Start Date. 5/28/2019 End Date: 6/7/2019
Site: F
Soud Date/time: 10/711989 12:00:00AM
AFE No
K3-019CT-C (2,401,556.00 )
Page 10 of 15 I
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Ars Task
Cade NPT Total Depth Phase Description of Operations
(hr)
(usft)
_
03:00 - 09:00 6.00 DRILL
P 11,913.00 PROD? DRILL 4-1/4" LATERAL FROM 11913' TO 12120'.
- FREE SPIN: 3945 PSI, 2.60 BPM
- RATE: 2.60 BPM IN, 2.59 BPM OUT. CIRC
PRESSURE: 3945-4302 PSI
- MUD WEIGHT: 8.75 PPG IN, 8.70 PPG OUT,
ECD: 10.34 PPG AT BIT
- ROP: 60-70 FT/HR, WOB: 2.5- 3.0 KLBS
'- FREQUENT PICKUPS
- TRUCKS ON THE WAY OUT FOR MUD SWAP
'- PICK UP FROM 12057' IS 68K, PULL 100'
WIPER. CLEAN PASS UP AND DOWN.
0900 - 1400 5.00 DRILL
_
P 11,913.00 PROD1 I START NEW MUD DOWN THE CT.
CONTINUE DRILLING FROM 12120'.
DRILL 4-1/4" LATERAL FROM 12120' TO 12315'.
-FREE SPIN: 3730 PSI, 2.83 BPM WITH NEW
.MUDAROUND
,- RATE: 2.83 BPM IN, 2.85 BPM OUT. CIRC
'PRESSURE: 3900-4150 PSI
- MUD WEIGHT: 8.64 PPG IN, 8.53 PPG OUT,
ECD: 10.07 PPG AT BIT, 9.72 PPG AT WINDOW
- ROP: 60-100 FT/HR, WOB: 2.5- 3.0 KLBS
- FREQUENT HEAVY PICKUPS WHENEVER
DIFFERENTIAL PRESSURE DRILLS OFF.
- INCREASE LUBES IN NEW MUD UP TO
325%.
- AT 12250 PUMP 10 BBLS LO / HI VIS SWEEPS
- AT 12280' PULL 150' WIPER TRIP, CLEAN
PASS UP AND DOWN.
1400 - 16:00 2.00 DRILL
P 12,338.00 PROD1 DRILL 4-1/4" LATERAL FROM 12315' TO 12368'.
- FREE SPIN: 3890 PSI, 2.77 BPM
- RATE: 2.77 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3900-4150 PSI
- MUD WEIGHT: 8.66 PPG IN, 8.55 PPG OUT,
ECD: 10.10 PPG AT BIT, 9.73 PPG AT WINDOW
- ROP: 60 - 90 FT/HR, WOB: 2.5- 3.0 KLBS
- FREQUENT PICKUPS WHENEVER
DIFFERENTIAL PRESSURE DRILLS OFF.
-STACKING WEIGHT OFF BOTTOM ON
TURNAROUNDS.
16:00 - 19:30 3.50 DRILL
_
P 12,338.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 12368' MD
I- RATE: 2.79 BPM IN, 2.65 BPM OUT. CIRC
PRESSURE: 3800 PSI
- SLIGHT OVERPULL THROUGH 11120
SHALES, ABOUT 3K ON DWOB.
- 100 FT JOG BELOW WINDOW.
- PULL THROUGH WINDOW AT 30L, 0.4 BPM,
SEE 4K ON DWOB. RUN BACK DOWN THEN
TRV AGAIN AT 10 FT/MIN, CLEAN.
- OPEN EDC, JET WHIPSTOCK TRAY. HADA
SET DOWN WHILE RUNNING THROUGH.
PICKED UP CLEAN. RUN BACK DOWN.
INCREASE RATE.
- PUMP 10 BELS LO / HI VIS SWEEPS.
-JET UP TO 7500' AT 4.0 BPM IN RATE/3.88
BPM OUT RATE. BOTTOMS UP FROM 7500'
BROUGHT SHALE PIECES. CLEANED UP
QUICKLY AFTER BOTTOMS UP. CONTINUE
TO BOTTOM _
19:30 - 20:00 0.50 DRILL
P 12,338.00 PROD1 - LOG DOWN FOR TIE-IN FROM 10,240 TO
10266' MD (FORMATION) WITH +5'
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Page 11 of 15
Common Well Name: F-34
- FREE SPIN: 3750 PSI, 2.80 BPM
AEE No
Event Type. RE-ENTER- ONSHORE(RON)
Start Date: 5/28/2019
End Date: 677/2019
X3-019CT-C:(2,401,556.00)
Protect: PBU
Site: F
'- MUD WEIGHT: 8.66 PPG IN, 8.53 PPG OUT,
Rig Name/No.: CDR -2
Spud Date/Time: 10!7/1989 12:00:00AM
Rig Release: 6/13/2019
Rig Contractor. NABORS ALASKA DRILLING INC.
- ROP: 60 FT/HR, WOB: 2.5- 3.0 KLBS
BPUOL USA00000752
Active datum: KB @64-38usft (above Mean Sea Level)
HAVING TO RECIPROCATE PIPE A LOT TO
Dale From - To Hire
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft)
_
2000 - 0000 4.00
DRILL P
12,442.00 PROD?
DRILL 4-1/4* LATERAL
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths"'
- FREE SPIN: 3750 PSI, 2.80 BPM
- RATE: 2.80 BPM IN, 2.80 BPM OUT, CIRC
PRESSURE: 3750-4150 PSI
'- MUD WEIGHT: 8.66 PPG IN, 8.53 PPG OUT,
ECD: 10.17 PPG
- ROP: 60 FT/HR, WOB: 2.5- 3.0 KLBS
HAVING TO RECIPROCATE PIPE A LOT TO
KEEP DRILLING.
6/5/2019 00:00 - 01:30 1.50 DRILL P
12,442.00
PROW DRILL 4-114" LATERAL
'- FREE SPIN: 4009 PSI, 2.79 BPM
- RATE: 2.79 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 4009- PSI
- MUD WEIGHT: 8.70 PPG IN, 8.53 PPG OUT,
ECD: 10.17 PPG
- ROP: 60 FT/HR, WOB: 2.5- 3.0 KLBS
HAVING TO RECIPROCATE PIPE A LOT TO
KEEP DRILLING.
01:30 - 03:00 1.50 DRILL N
12,486.00
PRODi DIFFERENTIALLY STUCK
.- PULL MULTIPLE TIMES TO 80K MULTIPLE
.TIMES. HOTORIENTS. STUCKABOVEDPS
.SOMEWHERE
- PUMP 10 BBLS KCL SPACER / 20 BELS LVT /
10 BBLS KCL SPACER
- PUMP 10 BBLS OUT. ALLOW TO SOAK. RIH
TO COMPRESSION/ PULL INTO TENSION AND
POPPED FREE.
- SHORT WIPER / GET LVT AND SPACERS
OUT BIT._
03:00 - 03:30 0.50 DRILL P
12,515.00
PROW DRILL 4-1/4" LATERAL
- FREE SPIN: 3945 PSI, 2.77 BPM
- RATE: 2.77 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 3945- PSI
- MUD WEIGHT: 8.70 PPG IN, 8.53 PPG OUT,
ECD: 9.62 PPG
- ROP: 60 FT/HR, WOB: 2.5-4.0 KLBS
- SPACERS AND MINERAL OILAT SURFACE.
SHORT WIPER WHILE DIVERTING TO TANK
03:30 - 04:00 0.50 DRILL P
12,515.00
PRODt PERFORM SHORT WIPER TRIP FROM 12512'
MD TO 12000' MD
- RATE: 2.79 BPM IN, 2.66 BPM OUT. CIRC
PRESSURE: 3639 PSI
-BRING FLUID BACK INSIDE. HEADBACKTO
BOTTOM
04:00 - 11:30 7.50 DRILL P
_
12,736.00
PROD? DRILL 4-1/4" LATERAL FROM 12515 TO 12736'.
- FREE SPIN: 3850 PSI, 2.82 BPM
- RATE: 2.82 BPM IN, 2.82 BPM OUT. CIRC
PRESSURE: 3945- 4332 PSI
- MUD WEIGHT: 6.70 PPG IN, 8.53 PPG OUT,
ECD: 10.11 PPG
- ROP: 60 FT/HR, WOB: 2.5-4.0 KLBS
- FREQUENT PICKUPS WHENEVER
PRESSURE AND DWOB DRILLS OFF.
- AT 12850' PUMP 10 BELS LO / HI VIS
SWEEPS.
- DIFFICULT TO TURN AROUND AFTER
PICKUPS.
- AT 12709' PULL 200' WIPER TRIP TRYING TO
GET BACK TO BOTTOM.
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths"'
North America - ALASKA - BP
Page 12 of 15 1
Operation Summary Report
--___ — - -
Common Well Name: F-34 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 5/28/2019 End Date. 6/7/2019 X3-019CT-C: (2,401,556.00 )
Project: PBU Site. F
Rig Name/No.: CDR -2 Spud DatelTime: 10!7/1989 12:00:00AM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752 _
Active datum: KB @64.38usR (above Mean Sea Level)
Date From - To - Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) - (usft)-
—
11:30 - 1730 6.00 DRILL P 12,736.00
PROD? PERFORM LONG WIPER TRIP FROM 12736'
MD TO 7500' MD
- RATE: 2.82 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 3920 PSI
'- PERFORM 1 00'JOG BELOW WINDOW.
- PULL THROUGH WINDOW WITH SLIGHT
WEIGHT BOBBLES, AROUND 3-5K ON DWOB.
- OPEN EDC AND JET WHIPSTOCK TRAY.
- PUMP 10 BBLS LO / HI VIS SWEEPS
AROUND, JET 7" BACK TO 7500'
- OBSERVE INCREASE IN CUTTINGS OVER
THE SHAKER AT BOTTOMS UP AFTER
,JETTING THE 7" CONTAINING SOME SHUBLIK
AND SHALE PIECES
- TIE IN WITH +T CORRECTION
- NO ISSUES RUNNING THROUGH THE
WINDOW
'-OBSERVE 3 KLB WOB WHILE RUNNING IN
_ THE HOLEAT 11,100' MD
17:30 - 00:00 6.50 DRILL P 12,924.00 PRODt DRILL4-1/4" LATERAL FROM 12736' TO 12924'
FREE SPIN: 4050, 2.7 BPM
RATE: 2.67 BPM IN / 2.67 BPM OUT. CIRC
PRESSURE: 4150 - 4350 PSI
- MUD WEIGHT 8.74 PPG IN / 8.6 PPG OUT,
ECD: 10.44 PPG
- ROP: 40 - 80 FT/HR, WOB 2.5 - 4.0 KLBS
- OBSERVE COIL WEIGHT INCREASE FROM -2
KLBS TO 14 KLBSAFTER LONG WIPER TRIP
- SWAP TO NEW MUD SYSTEM AT 12880'
OBSERVE 400 PSI PUMP PRESSURE DROP
NOTE: HELD KICK WHILE DRILLING DRILL
WITH RICK ROY'S CREW -WELL SECURED IN
68 SECONDS (SIMULATED)
6/6/2019 00:00 - 04:00 4.00 DRILL P 13,020.00 PROD? DRILL 4-1/4" LATERAL FROM 12924' TO 13020'
FREE SPIN: 3560, 2.6 BPM
- RATE: 2.66 BPM IN / 2.65 BPM OUT. CIRC
PRESSURE: 3800-4000 PSI
- MUD WEIGHT 8.56 PPG IN / 8.52 PPG OUT,
ECD: 10.00 PPG
- ROP: 40 - 80 FT/HR, WOB 1.7 -3.0 KLBS
-FREQUENT PICKUPS AND SHORT WIPERS
DUE TO DIFFERENTIAL STICKING,
NOTE: EXPERIENCE ERATIC COIL Wr, FOUND
SMALL BITS OF RUBBER STARTING AT 12980'
SAMPLE DEPTH, DURING DISCUSSION WITH
ODE START EXPERIENCING PRESSURE
SPIKES, MAKE DECISION TO POOH AND
SWAP OUT MOTOR AND AGITATOR.
Primed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 13 of 15
Operation Summary Report
Common Well Name. F-34
- 13:30
1.00
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/28/2019
End Date: 617/2019
X3-019CT-C: (2,401,556.00 )
Project PBU
Site: F
- PULL THROUGH WINDOW WITH NO ISSUES
Rig Name/No.: CDR -2
Spud Dalerrime: 10/7/1989 12:00 GGAM
Rig Release: 6/13/2019
Rig Contractor: NABORSALASKA DRILLING INC.
AROUND, JET 7- BACK 707500'
BPUOI: USA00000752
Active datum: KB @64.38usR (above Mean Sea Level)
WITH SWEEPS OR BOTTOMS UP AT THE TOP
Date From - To Him
Task Code NET
Total Depth Phase
Description of Operations
(hr)
_ _ _
_ (usft)
PROD1 MONITOR WELL FOR 10 MINUTES AT BHA:
04:00 - 10:30 6.50
DRILL N
13,020.00 PROD1
POOH
10:30 - 11:30 1.00
11:30 - 12:30 1.00
DRILL N
DRILL P
12:30
- 13:30
1.00
DRILL N
13:30
- 18:00
4.50
DRILL N
18:00 - 20:00 2.00 DRILL P
Printed 6125/2019 10:04:59AM **All depths reported in Drillers Depths"
- RATE: 2.5 BPM IN, 2.46 BPM OUT. CIRC
PRESSURE: 4100 PSI, ADJUST RATE UP AS
ALLOWABLE BY PRESSURE.
- PUMP 5X5 LOW/HI VIS SWEEP
- PERFORM 100' JOG BELOW WINDOW.
- PULL THROUGH WINDOW WITH NO ISSUES
- OPEN EDC AND JET WHIPSTOCK TRAY.
- PUMP 10 BBLS LO / HI VIS SWEEPS
AROUND, JET 7- BACK 707500'
- NO SIGNIFICANT INCREASE IN CUTTINGS
WITH SWEEPS OR BOTTOMS UP AT THE TOP
OF THE 7" OR TANGENT SECTIONS
- FUNCTION TEST AGITATOR AT 200',
_AGITATOR IS WORKING
13,020.00
PROD1 MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
'-CLOSE EDC, POWER DOWN
-INJECTOR OFF: 10:30
- BIT GRADE 1 1 NO -A -X -1 -BR -PP
13,020.00
PROD1 FUNCTION TEST BOPE, CHANGE
PACKOFF/FLOATS.
,- FUNCTION TEST BOPE, FULL TEST DUE 6/12
'-HOLD KICK WHILE TRIPPING DRILLWITH
INJECTOR CART RAISED WITH WARD CREW.
WELL SECURED IN 116 SECS
-CHANGE OUT PACKOFF AND FLOATS.
PRESSURE TEST 250 LOW / 3500 HIGH FOR 5
MINUTES _
13,020.00
PROD1 MAKE UP 4.25" DRILLING BHA #4
- PICK UP 2-7/8" XTREME MOTOR (1.58° AKO)
AND 3" COILTRAK TOOLS
- MAKE UP 4.25" HYCALOG BICENTER BIT
(RE -RUN BIT FROM BUILD)
- PRESSURE TEST OTS TO 250 PSI LOW /
3500 PSI HIGH FOR 5 MINUTES
-INJECTOR ON: 13:30
13,020.00
PROD1 RIH WITH 4.25" DRILLING BHA#4 FROM
SURFACE TO 13021' MD
- MUD WEIGHT: 8.61 PPG IN, 8.53 PPG OUT
-LOG DOWN FOR TIE-IN WITH -26'
CORRECTION
- OBSERVE -7K WOB AT 10,418' MD, PICK UP
RUN BACK THROUGH WITH NO ISSUE
- OBSERVE -2K WOB AT 11,116' MD
- OBSERVE -4K WOB AT 11,196' MD
13,133.00
PRODt DRILL 4-1/4" LATERAL FROM 13030'7013133'
TO UNCORRECTED
- FREE SPIN: 3510, 2.75 BPM
- RATE: 2.75 BPM IN / 2.73 BPM OUT. CIRC
PRESSURE: 3950 PSI
- MUD WEIGHT 8.7 PPG IN / 8.59 PPG OUT,
ECD: 1021 PPG
- ROP: 40 - 80 FT/HR, WOB 1.7 -3.0 KLBS
Printed 6125/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 14 of 15
Common Well Name: F-34
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 5/2B/2019 End Date 6/7/2D19
-Project: PBU Site: F ..
Rig Name/No.: CDR -2 Spud Date/Time. 10/7/1989 12:00:OOAM
AFE No
X3-019CT-C'.(2,401,556.00)
Rig Release: 6/13/2019
Rig Contractor. NABORSALASKA DRILLING INC.
6PUO1: USA00000752
Active datum: KB @64.38usR (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(h9 (usft) __._
_
20:00 - 00:00 4.00 DRILL P 13,133.00 PROD1
WIPERTRIP
- RATE: 2.82 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 3920 PSI
- 4K OVERPULL AT 11130'
- 8K OVERPULL AT 11100' -WORK THROUGH
SECTION FROM 11050'-11200' UNTIL CLEAN
- OBSERVE INCREASE IN BORE AND
ANNULAR PRESSURE AT 10580 AND 10400'
JOG IN HOLE 100'X 2 AND PULL BACK
THROUGH
-- PERFORM 100' JOG BELOW WINDOW.
-PULL THROUGH WINDOW WITH SLIGHT
WEIGHT BOBBLES, AROUND 3-5K ON DWOB.
- WITH BITABOVEWINDOW OBSERVE SK
OVER ON COIL WEIGHT BUT NOT AT BITAT
10183' PULL UP TO 10100 AND THEN RBIH TO
10150'
'- OPEN EDC, INCREASE RATE TO 4 BPM AT
3800 PSI AND JET WHIPSTOCK TRAY.
- PUMP 5 BBLS LO / HI VIS SWEEPS AROUND,
JET 7" BACK TO 7500'
60/2019 0000 - 0430 4.50 DRILL P 13,133.00 PRODI
WIPERTRIP
-4 BPM AT 3800 PSI THROUGH OPEN EDC
- JET WHIPSTOCK TRAY.
-PUMPS BBLS LO/ HI VIS SWEEPS AROUND,
JET 7" BACK TO 7500' AT 20' PER MINUTE
-OBSERVE INCREASE IN FINE CUTTINGS
OVER THE SHAKER AT BOTTOMS UP AFTER
JETTING THE 7"
- OBSERVE SIGNS OF PACKING OFF AT 8075'
- OBSERVE LARGE INCREASE IN 0.25 TO
0.75" PIECES OF SHALE AT 2 X BOTTOMS UP
FROM THE 7"-SHUBLIK
- RUN BACK IN HOLE TO 8580'AND JET 7"
BACK TO 7500' AT 50' PER MINUTE RETURNS
ARE CLEANED UP.
- PICK UP WEIGHTABOVE WINDOW 50K,
SLACK OFF WEIGHTABOVE WINDOW 23K
- TIE IN WITH +3' CORRECTION
- NO ISSUES RUNNING THROUGH THE
WINDOW
- REDUCE PUMP RATE TO 0.5 BPM RUNNING
THROUGH SHALES
- OBSERVE -3K WOB AT 10,524' MD,
- PUMP 5 BBLS LO / HI VIS SWEEP
- TAG AT 13133'CORRECTED TO
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: F-34
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 5/28/2019 End Date. 6/7/2015
Proiecr: PBU Site: F
AFE No
Q 019CT-C(2,401,556.00 )
Page 15 of 15
Rig Name/No.: CDR -2 Spud Daterrime: 10!7/1989 12.00 OOAM
Rig Release: 6113/2p19
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI _USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Him Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
04:30 - 18:00 13.50 DRILL
P 13,133.00
PROD1 WIPER TRIP FROM TDAT 13,133' MD TO THE
SWAB
- RATE: 2.82 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 3900 PSI
- REDUCE PUMP RATE TO 0.5 BPM PULLING
THROUGH SHALES WITH A 100' JOG PRIOR
TO ENTERING THEM
- PUMP 10X10 SWEEP AT THE TOP OF THE
TANGENT SECTION AT 7500' MD OBSERVE
MINIMAL INCREASE IN CUTTINGS
- TIE INTO FORMATION WITH -22'
CORRECTION
- RUN IN THE HOLE FROM THE WINDOW
- OBSERVE 6 KLBS SET DOWN AT 10,500' MD,
PICK UP AND SET DOWN 4 KLBS AND PASS
THROUGH.
- OBSERVE SIGNIFICANT INCREASE IN
CUTTINGS AT BOTTOMS UP AFTER SET
DOWN POINT
- RUN BACK THROUGH TROUBLE SECTION
TO THE WINDOWAND JET TRAY
- PUMP 2 HI VIS SWEEPS WITH LARGE
INCREASE IN FINE CUTTINGS AT BOTTOMS
UP
- RUN BACK IN THE HOLE TO LAY IN LINER
PILL_
1800 - 2300 5.00 DRILL
P 13,133.00
PRODt - POOH LAYING IN LINER RUNNING PILL
-ABOVE WINDOW OPEN EDC AND JET TRAY
AT 4 BPM AT 3800 PSI
- POOH TO 7" PULL THROUGH 7" AT 40' PER
MINUTE AND JOG 7" NO INCREASED
CUTTINGS OBSERVED
- POOH AT SUPER MINUTE
-AT SURFACE JOG 500'
- MONITOR WELL FOR 10 MINUTES -STATIC.
-NOTE PAINT FLAGS AT 9383..2 (YELLOW) TD
_ _AND 6483.82 (WHITE) WINDOW.
23:00 - 00:00 1.00 DRILL
P 13,133.00
PROD? LAY DOWN BHA
INJECTOR OFF AT 2300 HRS
BIT 1 -1 -N -A -X -1 -TD
Printed 6/2512019 10:04:59AM **All depths reported in Drillers Depths**
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 1 of B
Operation Summary Report
Common Well Name F-34
AFE No
Event Type'. COM -ONSHORE (CON)
Start Dale'. 6/8/2019 End Date: 6/13/2019
X3-019CT-C: (1,331,514.00 )
Project: PBU -.
Site: F
Rig Name/No.: CDR -2
Spud Date/Time: 10!//1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00000752 _
Active datum: KB @64.38usft (above Mean Sea Level)
_
Date From - To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr) —
lust)
6/8/2019 00:00 - 00:30 0.50
CASING P 13,133.00 RUNPRD
CLEAR RIG FLOOR AND PREP FOR LINER
RUN
00:30 - 06:00 5.50
CASING P 13,133.00 RUNPRD
PREP FOR LINER RUN
RD BHI UOC
'- PUMPED.233' OF 276', WE HAVE 190+' OF
PH6 TO ABSORB THE REMAINING ELINE
- CUT 30' OF COIL TO REMOVE FLAT SPOT
-- BOOT ELINE
- REHEAD COIL WITH NABORS KENDALL
I
',CONNECTOR
- PULL TEST THE CTC TO 50K
PT CTC 250 LOWAND 4700 PSI HIGH
.- RD TEST PLATE
- LOAD 7/8" DRIFT BALLAND PUMP -BALL
RECOVERED
- PREP RIG FLOOR FOR LINER RUN
- HOLD PJSM FOR RUNNING LINER.
NOTE: PIPE COUNT IN PIPE SHED VERIFIED
BY WSLAND FIELD SUPERVISOR.
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
North America - ALASKA - l
Page 2 of 8
Operation Summary Report
Common Well Name: F-34
AFE No
Event Type: COM- ONSHORE(CON) Start Date: 6/8/2019 End Date. 6/13/2019
X3-019CT-C:(1,331,514,00)
Project: PBU Site: F
Rig Namil CDR -2 Spud Dale/Time: 10!7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI USA00000752
Active datum: KB @64.38usR (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) -_ (usfi)
06:00 - 23:30 17.50 CASING P 13,133.00 RUNPRD
RUN 2-7/8", 6.5# AND 3-1/4", 8.8#L -BO LINER
TO 13133' MD
- RUN 109 JTS, FILL PIPE EVERY 20 JTS
- RA TAG BETWEEN JOINTS 54 AND 55 TO BE
PLACEDAT 11,403' MD WITH LINER ON
BOTTOM
- HANGING WEIGHT = 36 KLBS, BLOCKS =
14.5 KLBS, STRING WEIGHT =21.5 KLBS
WHICH EXCEEDS THE INJECTOR CARRIAGE
LIMIT
- STRIP INJECTOR OVER LINER WHILE
HANGING OFF ON PIPE SLIP RAMS
RUN LINER ON COIL
- PRESSURE TEST QTS TO 3500 PSI LOW/
HIGH FOR 5 MINUTES
- INJECTOR ON: 04:45
- CONTINUE IN HOLE TO FIRST FLAG AT 8370
EDP CORRECTION OF +54.34'(FOUND DIRTY
COUNTER WHEELAND CLEANED OFF SAME
BEFORE PROCEEDING IN HOLE)
- RIH AT 40 FT/MIN FROM 10092' MD TO TO
.- PU 49K, SO 23K AT WINDOW
'- MUD WEIGHT: 8.63 PPG IN, 8.54 PPG OUT
I- RATE: 0.51 BPM IN, 0.70 BPM OUT. CIRC
PRESSURE: 1540 PSI
-MUD LOSSES WHILE RIH:0 BBLS
- TIGHT SPOT AT 12865'-12995' WORK
SEVERAL TIMES TURN OFF PUMPS AND
PASSTHROUGH.
AT SECOND FLAG 9300' EOP CORRECTION
OF-70.36'(NET CORRECTION OF -16.02'
FROM FIRST COUNTER)
- NOT ABLE TO PASS 13030', PUMP 20 BBL LVT
PILL, WITH 5 BBLS OUT OF LINER START
MAKING PROGRESSAGAIN.
- TAG TO AT 13133' MD, PICKUP AND VERIFY
TAG.
- TOP OF LINER' 9613' MD
- CIRCULATE LVT OUT OF THE HOLE.
- STACK 10K LBS AND CIRCULATE ON
BOTTOM FOR 5 MINUTES
- RATE: 2.08 BPM IN, 1.98 BPM OUT. CIRC
PRESSURE: 2520 PSI
- TAKE PU WEIGHT OFF BOTTOM 3 TIMES:
52K
NOTE: HAVE TO TURN OFF PUMPS TO GET
BACK TO BOTTOM
HOLD KICK WHILE TRIPPING DRILL WITH
WARD CREW WHILE PICKING UP LINER. 5:56
TO SECURE WELL. HELD AAR WITH CREW
AND TOOLPUSHER.
2330 - 0000 0.50 CASING P 13,133.00 RUNPRD RELEASE FROM LINER
- POSITION REEL FOR BALL DROP AT 13131'
- VERIFY BALL SIZE (3/4" STEEL) AND LOAD
INTO REEL
- ZERO VOLUME ON ORION
- BALL CONFIRMED ROLLING, RATE IN = 2.0
BPM, RATE OUT 1.7
-SET BACK TO BOTTOM WITH LINER TO
13133'
Printed 6/25/2019 10:06:47AM •`AII depths reported in Drillers Depths"
Common Well Name. F-34
Event Type: COM- ONSHORE (CON)
Project: PBU
North America - ALASKA - BP Page 3 of 8
Operation Summary Report
AFE No
Start Date: 6/8/2019 Eno Date: 611312019 X3-019CT-C: (1,331,514,00)
Site: F
Rig Name/No.: CDR -2 Spud Daterrme: 10!7/1989 12:OO:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usfi (above Mean Sea Level)
Date From - To Hrs Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(usfl)
-RUNPRD
—_
6/9/2019 00:00 -03:00 3.00 CASING
P 13,133.00
-BALL CONFIRMED ROLLING, RATE IN= 2o
BPM, RATE OUT 1.7
-SET BACKTO BOTTOM WITH LINER TO
13133'
-BALL ON SEATAT 51 BBLS, SHUTDOWN
PUMP AT 4700 PSI, HOLD FOR 4 MINUTES,
BLEED OFF AND REPRESSURE TO 4700 AND
HOLD FOR 3.5 MINUTES SHEARED AT 4700
PSI
-SHUTDOWN PUMPANDPUTOVERIFYWE
ARE RELEASED
- PU TO VERIFY WE ARE FREE, UP Wi = 45K
PULLED 3' CLEAN AND STOPPED
�- SWAP WELL OVER TO KCL, RATE IN=2
BPM, OUT RATE = 1.6 BPM, REDUCE RATE 1.5
BPM IN AND 1.2 OUT
- KCLAT THE SHOE, LOSSES IMPROVING
-KCL TO SURFACE IN& OUT RATES ARE I:1
AT 1.5,2.0 AND 2.5 BPM
- FINAL PRESSURE AT 1.5 BPM =560
'- SIMOPS, HOLD PJSM FOR CEMENTING AND
PTCMTLINET0250/ 5000PSI
Printed 6/25/2019 10:06:47AM ••AII depths reported in Drillers Depths"
Common Well Name: F-34
Event Type: COM- ONSHORE (CON)
Project: PBU
Rig Name/No.: CDR -2
North America - ALASKA - BP Page 4 of 8
Operation Summary Report
AFE No
Start Date: 6/8/2019 End Date: 6/13/2019 X3-019CT-C'. (1,331,514.00)
Site: F
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Hrs Task Code
NPT Total Depth Phase Description of Operations
(hr)
(usft) _
_
03:00 - 05:00 2.00 CASING P
13,133.00 RUNPRD CEMENT LINER
-MIX AND PUMP 38.6 BBLS OF CEMENT:
H WATER AND PRESSURE
TEST TO 25015000PSI FOR 5 MINUTES -GOOD
TEST
- CEMENT WET AT 0300 HRS.
-ZERO IN MM ONCE DENSITY =13.5 PPG
- LOAD 38.6 BBLS 15.3 PPG CEMENT IN REEL
-SWAP TO RIG PUMP. CLEANUP LINES TO
SLB UNIT.
- PERFORM DISPLACEMENT WITH RIG
PUMPS
- DISPLACE CEMENT WITH 8.5 PPG EXHAUST
PILL
- RATE: 2.0 BPM IN, 2.0 BPM OUT
- ZERO OUT MM WITH CEMENT AT SHOE AT
82.7 BBLS AWAY
- TAKE RETURNS TO PILL PIT FOR MANUAL
STRAP
- SHUT DOWN PUMPS AT 94.6BBLS AWAY (12
BBLS BEHIND PIPE)
-LAUNCH PEE WEE DARTAND LINER WIPER
PLUG AS FOLLOWS:
'- PICK UP TO BREAKOVER+I6 FT (13110 MD)
PER BTT REP, EXPOSE DOGS, SET DOWN AT
13122' MD (13 FT HIGHER)
- PU: 50 KLBS, SO: 13 KLBS
-SHIFT LINER WIPER PLUG DOWN, PICK
BACK UP TO 13110' MD AND SIDE EXHAUST 6
BBLS
- SET DOWN 10KAT 13122' MD AND LAUNCH
PEE WEE DART.
- PRESSURE UP ON WIPER PLUG AND ZERO
MM.
- LINER WIPER PLUG SHEARED AT 4600 PSI
(0.6 BBLS)
- DISPLACE LINER WIPER PLUG
- 23.8 BBLS DISPLACED AT 1.75 BPM: 2200 PSI
- PLUG BUMPED AT 23.8 BBLS, 2200 PSI (23A
BBLS CALCULATED)
-OPEN BLEEDER AND CHECK FLOATS. GOOD
TEST.
- CLOSE BLEEDER, PRESSURE UP 701500
PSI ON COIL, PICK UP AND CONFIRM
PRESSURE DROP
- CEMENT IN PLACE: 0500 HRS
- 388BBLS CEMENT BEHIND PIPE BASED ON
MANUALSTRAP
-TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 0 BBLS
05:00 - 06:00 1.00 CASING P
_
13,133.00 RUNPRD CIRCULATE EXHAUST PILL OUT
-PUMP 5 BBLS AT 0.5 BBLS PER MINUTE
AFTER PRESSURE DROP
-PICK UP OUT OF LINER TOP
-PUMP4 BPM AT 2620 PSI 1 FOR i RETURNS
06'.00 - 08'.30 2.50 CASING P
13,133,00 RUNPRD PULL OUT OF THE HOLE FROM 9613' MD TO
SURFACE
- MUD WEIGHT: 8.42 PPG IN, 8.45 PPG OUT
- RATE: 4.12 BPM IN, 4.07 BPM OUT, 2140 PSI
Printed 625/2019 10:06:47AM ••AII depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Common Well Name: F-34 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/8/2019 End Date: 6/13/2019 X3-019CT-C (1,331 514 00 )
Project: PBU Site: F
Page 5 of 8
Rig Name/No.: CDR -2
Spud Date/Time: 10/7/1989 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00000752
Active datum: KB @64.38usR (above Mean Sea Level)
Date From - To
Hm Task Cade NPT Total Depth
Phase Description of Operations
(hr) _ (usfl)
_
08:30 - 09:30
1.00 CASING P 13,133.00
RUNPRD LD BHA
- MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
-INJECTOR OFF: 08:30
- LD AND INSPECT LINER RUNNING TOOL: NO
_ISSUES
09'.30 - 15:30
6.00 EVAL P 13,117.00
OTHCMP MAKE UP AND RUN IN HOLE WITH RPM
LOGGING BHA
- REHEAD COIL FROM NABORS CONNECTOR
TO BOT CONNECTOR
- PERFORM 50 KLB PULL TEST
- PRESSURE TEST TO 4500 PSI - GOOD TEST
- PICK UP 70 JOINTS OF 1-1/4" CSH AND
LOGGING ASSEMBLY PER BHA #6
15:30 - 18:30
3.00 EVAL P 13,117.00
OTHCMP RUN IN THE HOLE TO LOGING DEPTH WITH
BHA #6 ON COIL
-INJECTOR ON AT 15:37
- RUNINTHEHOLEAT80FT/MIN
- 0.49 BPM IN / 0.50 BPM OUT, 370 PSI
-SHUT DOWN PUMPS WHILE RUNNING
THROUGH THE LINER TOP
-SEE SLIGHT _
18:30 - 22:45
4.25 EVAL P 1 13,117.00 1
OTHCMP PERFORM RPM LOGGING
-RUN FROM 9950' MD TO TO AT .4 BPM AT 30
FPM
-1825 HRS STOP AT TD FLAG FROM LINER
1
RUN -16.38 CORRECTION -DID NOTADJUST
1
DEPTHS ON RIG SCREENS, CONTINUE AT
1832 HRS.
-1911 HRS AT 12764' TAKE WEIGHT NOTABLE
TO PASS, PICK UP TO 12742' INCREASE PUMP
RATE TO 1.5 BPM AND SLOW SPEED TO 15
FPM PASS THROUGH AT 1917 HRS AND
MAINTAIN NEW PARAMETERS.
-1942 HRS AT 13092' TAKE WEIGHT MILL
UNTIL WE SEE SOME MILL OFF, PICK UP TO
13076' AND RUN THROUGH AT 1951 HRS
-1955 HRS TAG HARD BOTTOM AT 13134'
UNCORRECTED ON DEPTH COUNTERS ON
CORRECT CORRECTED DEPTH FOR PSTO.
-2000 HRS -POOH FROM 13134.2' LOGGINGAT
20 FPM, PUMPING AT 1.5 BPM AT 2610 PSI.
-2241 HRS STOP AT 994_9.7' JOG IN HOLE 10' _
22:45 - 00:00
1.25 EVAL P 13,117.00
OTHCMP POOH FROM 9960' TO 2700'
-PUMPING AT 1.5 BPM AT 2025 PSI 1.52 BPM
IN / 1.01 BPM OUT
-PAINT FLAGAT 9252.84 BIT DEPTH 6942' END
OF PIPE UNCORRECTED
6/10/2019 00:00 - 01:00
1.00 EVAL P 13,117.00
OTHCMP POOH FROM 2700' TO 2400'
-PUMPING AT 1.5 BPM AT 2025 PSI 1.52 BPM
IN 11.01 BPM OUT
-MONITOR WELL FOR 10 MINUTES -STATIC
-HOLD PJSM FOR LAYING DOWN BHA.
_ -INSPECT LAST 100' OF COIL -GOOD
01:00 - 05:00
4.00 EVAL P 13,117.00
OTHCMP LAY DOWN RPM BHA
- INJECTOR OFF AT 0110 HRS
- LAY DOWN 70 JOINTS OF 1.25" CSH
-LAY DOWN RPM BHA
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 6 of 8
Operation Summary Report
Common Well Name: F-34
AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/8/2019 End Date: 6/13/2019
X3-019CT-C. (1.331,514.00 )
Project: PBU Site: F
Rig Name/No.: CDR -2 Spud Date/Time: 10/7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft) _
0500 - 0600 1.00 EVAL P 13,117.00 OTHCMP
PERFORM LINER LAP TEST TO 2400 PSI -FAIL
- OBSERVE 450 PSI PRESSURE LOSS IN
FIRST 15 MINUTES AND NO DECREASING
TREND
- ATTEMPT SECOND TEST WITH NO
SUCCESS_ _
0600 - 1590 9.00 EVAL P 13,117.00 OTHCMP
WAIT ON FINAL PERF MEMO FROM RPM LOG
DATA. WAIT FOR HALLIBURTON TCP TO
PREPARE GUNS.
- RECIEVE FINAL PERFORATION MEMO FROM
ANCHORAGE TEAM AT 09: 30
- WAIT FOR HALLIBURTON TCP TO ADJUST
GUNS BASED ON NEW PERFORATION MEMO
- REPLACE SEATS AND VALVES IN MUD
PUMPS WHILE WAITING ON GUNS
- PREPARE RIG FLOOR, PIPE SHED AND
TALLY FOR PERF GUNS
- CHECK PACKOFF, RETEST TO 3500 PSI -
GOOD TEST
- HALLIBURTON ARRIVE ON LOCATION AT
14:00 HRS
1500 - 19.00 400 PERFOB P 13,117.00 OTHCMP
MAKE UP 1403.5' OF HALLIBURTON TCP 2"
MILLENIUM GUNS, 6 SPF
'- HOLD PJSM IN DOGHOUSE. LOAD GUNS
INTO THE SHED AND CONFIRM GUNS WITH
TALLY
- PICK UP GUNS PER HALLIBURTON TCP
- FIRING HEAD ON AT 17:00 HRS
- GUNS SET TO UNLOCK FOR FIRING
SEQUENCE AT 20:23 HRS
- MAKE UP REMAINDER OF BHA# 7
-MAKE UP INJECTOR AND TEST QTS -GOOD
TEST.
19:00 - 23'.00 4.00 PERFOB P 13,117.00 OTHCMP
RIH WITH PERF BHA
-PUMPAT0.26 BPMAT110 PSI, 0.27BPMIN/
/0.71 BPM OUT
- CORRECT DEPTH AT FLAG-6.35'AT 9177.71'
CORRECTED
- SLOW TO 30 FPM AT 200' ABOVE LINER TOP
-TAG PBTD AT 13113' WITH 2K, UP Wr 51K
DOWN WT 22K
- POOH TO 12851' (SHOT DEPTH)
-CIRCULATE WITH 150 PSI APPLIED
PRESSURE
- PERFORM PERF GUN OPERATING
SEQUENCE PER HALLIBURTON REP
23:00 - 00:00 1.00
PERFOB P
- GOOD SHOT INDICATION: FELT VIBRATION
AND LOST WELLHEAD PRESSUREA BBLS TO
CATCH INITIAL RETURNS
- - CIRULATE @ 1.03 GPM IN 10,68 OUT WITH
205PSI
APPLIED WHILE POH ( LOSSES TOTAL _1_BBL) _
13,117.00 OTHCMP POH WITH PERF BHA
- POH GPM IN 1.02 / OUT 0.67
Printed 625/2019 10:06:47AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Common Well Name: F-34
Event Type: COM- ONSHORE (CON)
Start Date: 6/8/2019
Project PBU - -
Site: F --
Rig Name/No.: CDR -2
Spud Date/time: 10/7/1989
Rig Contractor: NABORS ALASKA DRILLING INC.
RIGD P
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
(hr).
6/11/2019 00:00 - 03:00 3.00
PERFOB P
03:00 - 08:30 5.50 PERFOB P
08:30 - 09:00 0.50 RIGD P
09:00 - 12:00 3.00 RIGD P
12:00 - 17:30 5.50 RIGD P
17:30
- 20:30
3.00
RIGD P
20:30
- 00:00
3.50
RIGD P
6/12/2019 00:00
- 03:30
3.50
RIGD P
End Date: 6/13/2019
AFE No
X3-019CT-C: (1,331,514.00 )
BPUOI: USA00000752
Page 7 of 8
Total Depth
Phase Description of Operations
(usft)
_
13,117.00
OTHCMP POH WITH PERF BHA
- FLOW CHECK AT TOL. - STATIC
- POH GPM IN 1.0 / OUT 0.7
- POOH TO 2500' (BULL NOSE DEPTH) CIRC
PORT AT 850'
- JOG IN THE HOLE TO 4000'
- CIRCULATE GUN GAS FROM WELL TAKING
RETURNS TO THE TIGER TANK.
- POOH TO 2500'
- FLOW CHECK -STATIC__ _
13,117.00
OTHCMP LAY DOWN I-1/4" CSH AND SPENT PERF
'GUNS
i- PREJOB SAFETY MEETING
'- LIFT OFF INJECTOR
LAY DOWN PERF BHA
FIRED__
13,117.00
_-AL_LGUNS
POST MAKE UP NOZZLE FOR FREEZE PROTECT
--
MAKE UP INJECTOR TO WELL
13,117.00
POST FREEZE PROTECT WELL FROM 2500' MD
- RUN IN THE HOLE TO 2500' MD
- RIG UP LITTLE RED SERVICES AND HOLD
PJSM
LEAK TIGHT TEST LINES TO 2504000 PSI
'GOOD TEST
- FREEZE PROTECT WITH DIESEL FROM 2500'
MD WITH 38 BBLS OF DIESEL
13,117.00
POST BLOW DOWN COIL FOR REEL SWAP
- DISPLACE COIL TO FRESH WATER TAKING
RETURNS TO THE TIGER TANK
- FLUSH LINESAND COIL WITH FRESH
WATER
- RIG UP HALLIBURTON NITROGEN
- PUMP 36 BBLS OF CORROSION INHIBITED
FRESHWATER FOLLOWED BY 15 BBLS OF
METHANOL
- HOLD PJSM WITH CREW FOR NITROGEN
BLOW DOWN
- PRESSURE TEST NITROGEN LINES TO 4000
PSI
- BLOW DOWN COIL WITH NITROGEN TO
TIGER TANK
- MAXIMUM 3 BPM RATE AND 150 PSI
DOWNSTREAM OF CHOKE
- ALLOW PRESSURE TO DISAPATE TO TIGER
TANK
- REMOVE INJECTOR AND BREAKDOWN
NOZZLE BHA
13,117.00
POST PREPARE TO CHANGE OUT REEL
- REMOVE HIGH PRESSURE BULK HEAD
- UNSTAB COIL
- REMOVE INNER REEL IRON _
13,117.00
_
POST SWAP REELS
-REMOVE OLD 2 3/8" REEL 38571 -WL
-INSTALL NEW 2 3/8" REEL STRING #52429
-SHIM HUBS
13,117.00
POST REELS
(SWAP
- SHIM HUBS
- GRAPPLE INSTALLED AND PULL TESTED.
- PULL COILTO INJECTOR
-REMOVE GRAPPLE
- INSTALL COIL CUTTER
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 8 of e
Operation Summary Report
Common Well Name: F-34
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 6/8/2019 End Date: 6/13/2019
X3-019CT-C: (1,331,514.00)
Project: PBU
Sita: F
Rig Name/No.: CDR-2
Spud Date/Time: 10/7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor NABORS ALASKA DRILLING INC.
-
BPUOI: USA00000752
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To Hns
Task Code NPT Total Depth Phase
Description of Operations
(hr)
_ _ (usft)
—
03:30 - 00:00 20.50
RIGID P 13,117.00 POST
CUT COIL
- HOLD PJSM WITH CREW
- CUT 1300' OF COIL, BOOT THE VIRE AND
PUMP SLACK BACK, WE NEED 130' MORE
SLACK FOR 2%
- PUMPED SLACK BACK 3 TIMES WITH AND
THE WIRE DID NOT MOVE, CALL ODE
- CUT 200', TRY PUMPING SLACK BACKAGAIN
AND CALL OUT FOR 200 BBLS OF 120' FRESH
WATER
- WIRE DID NOT MOVE, CALL ODE AND
SUGGEST BOOTING THE WIRE, MU A CTC,
STINGER AND NOZZLE, PUMP SLACK
FORWARD THEN PUMP BACKAGAIN TO SEE
IF IT WILL MOVE
- CALL OUT BOT FOR CTC
- PULL TEST TO 40K AND PT TO 3500 PSI
- LOAD COIL WITH 120° FRESHWATER. NO
SUBSTANTIAL MOVEMENT.
- REVERSE CIRCULATE AT MAX RATE. NO
MOVEMENT. REMOVE INJECTOR. CUT SLIP
CONNECTOR OFF. WIRE DID NOT MOVE.
- PREPARE COIL FOR CTC.
- INSTALL AND PULL TEST TO 50K. RE-CUT.
'- INSTALLAND PULL TEST TO 50K.
HEAD UP BHI UQC
r-
6/13/2019 00:00 - 01:30 1.50 1
-
RIGD P 13,117.00 POST
FINISH MAKE UP OF BHI UQC WITHOUT
FLOATS
- PRESSURE TEST INNER REEL IRON, COIL
CONNECTOR, AND UQC TO 45009. GOOD
TEST
01'.30 - 03'.30 2.00
RIGD P 13,117.00 POST
PJSM,
-FOLLOW COMMAND AND CONTROL FOR
RIG BLOWDOWN
- BLOWDOWN COILAND RIG IRON
- RD MANAGE PRESSURE LINE
-FILL TREE WITH METHANOL. LTT BETWEEN
MASTER AND SWAB 7O 3500#. GOOD TEST
03:30 - 06:30 3.00
RIGID P 13,117.00 POST
BEGIN NIPPLE DOWN OF BOPE
INSTALL TREE CAP AND TEST TO 250 LOW
AND 3500 PSI HIGH
GOOD TEST
_RIG RELEASED AT 06:30"'
Printed 6/25/2019 10:06:47AM **All depths reported in Drillers Depths"
Daily Report of Well Operations
F -34C
n rrinrvnnrc SI IMM PY
T/I/O=Vac/0/0. Post CDR2. Set H TWC #296 @130". RD CDR2 tree #4 with killline #1. RU
new 4" Cameron tree tag #107 PT to low 300psi and high 5000psi for 5min ea. Passed.
6/14/2019
Pulled H TWC #296 @130". Job Complete. See log. Final WHP's VaG0/0.
*"WELL SHUT IN ON ARRIVAL***(post ctd)
DRIFTED TO 10,307' SLM wl 2.57" CENT, 1.5" S-BLR.
6/17/2019
***WSR CONTINUED ON 6/18/19***
T/1/0=0/525/66 Temp= S/I Assist S -Line (Test LTP) MIT -T PASSED to 2639 psi. (2750
Max, 2500 Target) Pumped 33 bbls Diesel, 9.4 bbls 50/50 down Tbg. to load/Reach test
6/18/2019
1pressure Loss of 24 psi 1st 15 min, Loss of 11 psi 2nd 15 min. FWHP=1300/75/40
***WSR CONTINUED FROM 6/17/19*** (ctd)
PERFORMED SBHP PER PROGRAM.
DRIFTED TO 9,613' MD w/ KB PACKER & PTSA STINGER DRIFT.
SET 45 KB PACKER & PTSAASSEMBLY IN LINER @ 9,606' MD. (Min ID: 2.31" x -nip)
LRS SUCCESSFULLY MIT -T TO 2,604 psi.
PULLED 2-7/8" XX PLUG FROM PTSAASSMBLY @ 9,603' SLM (9616' MD).
SET 4-1/2" X -CATCHER IN X -NIPPLE @ 7,997' MD.
PULLED RK-DGLV's FROM ST# 4 @ 4,975' MD & ST# 5 @ 3,248' MD.
SET RK-LGLV IN ST# 5 & RK-OGLV IN ST# 4.
PULLED EMPTY 4-1/2" X -CATCHER FROM 7,997' MD.
6/18/2019
***JOB COMPLETE, WELL LEFT S/I***
North America - ALASKA - BP
PBU
F
F-34
F -34C
500292198003
Design: F -34C
Final Survey Report
13 June, 2019
N ee
Company:
North America -ALASKA - BP
Project
PBU
Site:
F
Well:
F-34
Wellbore:
F -34C
Design:
F -34C
BP
Final Survey Report
Local Coordinate Reference:
Well F-34
TVD Reference:
KB @ 64.38usft (F -34B)
MD Reference:
KB @ 64.38usft (F -34B)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [28734'1586• Using geodetic scale factor
site —
_. F, TR -11-13
Site Position:
Northing:
5,972,527.290 ,it
Latitude:
70° 19'55.283 N
From:
Map
Easting:
650,960.700 usft
Longitude:
148'46'31.468W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.15 °
Well
F-34, F-34
Well Position
+N/ -S 0.00 usft
Northing:
5,974,667.000 usft
Latitude:
70° 20' 16.126 N
+E/ -W 0.00 usft
Easting:
651,959.000 usft
Longitude:
148' 46'1.057 W
Position Uncertainty
0.00 Usti
Wellhead Elevation:
35.67 usft
Ground Level:
35.02 usft
Wellbore
F -34C
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(nT)
BGGM2018 6/1/2019
16.82
80.94
57,425
_
Design
F -34C
I
Audit Notes:
Version:
Phase:
ACTUAL Tie On Depth: 10,198.74
Vertical Section:
Depth From (TVD)
-NI-S +E/ -W
Direction
(usft)
(usft) (usft)
V)
2571
0.00 0.00
35.28
61132019 8:27:21AM
Paye 2
COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company: North America - ALASKA- BP
Local Coordinate
Reference:
Well F-34
Project: PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site F
MD Reference:
KB @ 64.38usft (F -34B)
Well: F-34
North Reference:
True
Wellbore: F -34C
Survey Calculation Method:
Minimum Curvature
Design: F -34C
Database:
EDM R5K-Alaska PROD -ANCP1
Survey Program
Date 6/10/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
98.74
7,473.74 F-34 Srvy 2 GYD-CT-CMS
(F-34)
GYD-CT-CMS
Gyrodata cont.casing
m/s
7,498.74
10,198.74 F -34B Srvy 2
GYD-CT-CMS (F -34B)
GYD-CT-CMS
Gyrodata oont.casing
m/s
10,208.00
13,133.00 Survey#1 (F -34C)
MWD
MWD -Standard
Survey
MD
Inc Az,
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft)
(`) V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) ('1100usft)
(usft)
28.71
0.00
0.00
28.71
-35.67
0.00
0.00
5,974,667.000
651,959.000
0.00
0.00
98.74
0.18
223.41
98.74
34.36
-0.08
-0.08
5,974,666.919
651,958.926
0.26
-0.11
198.74
0.19
227.85
198.74
134.36
-0.31
-0.31
5,974,666.689
651,958.700
0.02
-043
298.74
0.20
229.95
298.74
234.36
-0.53
-0.56
5,974,666.460
651,958.448
0.01
-0.76
398.74
0.25
237.85
398.74
334.36
-0.76
-0.88
5,974,666.225
651,958.134
0.06
-1.13
498.74
0.34
258.68
498.74
434.36
-0.93
-1.36
5,974,666.041
651,957.662
0,14
-1.54
598.74
0.34
256.41
598.73
534.35
-1.06
-1.94
5,974,665.901
651,957.086
0.01
-198
698.74
0.33
262.54
698.73
634.35
-1.17
-2.51
5,974,665.783
651,956.514
0.04
-240
798.74
0.25
270.41
798.73
734.35
-1.20
-3.01
5,974,665.737
651,956.011
0.09
-2.72
898.74
0.19
298.29
898.73
834.35
-1.12
-3.38
5,974,665.809
651,955.646
0.12
-2.87
998.74
0.15
281.56
998.73
934.35
-1.02
-3.65
5,974,665.909
651,955.369
0.06
-2.94
1,098.74
0.09
276.45
1,098.73
1,034.35
-0.98
-3.86
5,974,665.940
651,955.162
0.06
3.03
1,198.74
0.09
250.46
1,198.73
1,134.35
-1.00
-4.01
5,974,665.919
651,955.011
0.04
-3.13
1,298.74
0.04
184.81
1,298.73
1,234.35
-1.06
-4.09
5,974,665.856
651,954.935
0.08
-3.23
1,398.74
0.13
113.74
1,398.73
1,334.35
-1.14
-3.99
5,974,665.778
651,955.038
0.12
-3.23
1,498.74
0.21
106.24
1,496.73
1,434.35
-1.24
-3.71
5,974,665.687
651,955.319
0.08
-3.15
1,598.74
0.30
107.33
1,598.73
1,534.35
-1.37
-3.28
5,974,665.566
651,955.748
0.09
-3.01
1,698.74
0.47
91.21
1,698.73
1,634.35
-1.45
-2.62
5,974,665.493
651,956.409
0.20
-2.70
1,798.74
0.45
78.54
1,798.72
1,734.34
-1.38
-1.83
5,974,665.578
651,957.202
0.10
-2.19
1,898.74
0.50
81.99
1,898.72
1,834.34
-1.25
-1.01
5,974,665.734
651,958.016
0.06
-1.80
6/13/2019 8:27:21AM Page 3 COMPASS 5000.1 Build 81D
ee
Company:
North America - ALASKA - BP
Project:
PBU
Site:
F
Well:
F-34
Wellbore:
F -34C
Design:
F -34C
Survey
MD
(usft)
199874
2,098.74
2,198.74
2,298.74
2,398.74
2,498.74
2,598.74
2,698.74
2,798.74
2,698.74
2,998.74
3,098.74
3,198.74
3,298.74
3,398.74
3,448.74
3,473.74
3,498.74
3,523.74
3,548.74
3,573.74
3,598.74
3,623.74
3,648.74
3,673.74
3,698.74
3,723.74
Inc
l°1
BP
Final Survey Report
Local Coordinate Reference:
Well F-34
TVD Reference:
KB 64.38usft (F -34B)
MD Reference:
KB @ 64.38usft (F -34B)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
6/132019 6.27 21AM Page 4 COMPASS 5000.1 Build BID
Azi
TVD
TVDSS
N/S
E/W
Northing
Easung
D1.e9
V. Sec
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(1100usft)
(usft)
0.44
106.20
199872
1,934.34
-1.29
-0.21
5,974,665.704
651,958.818
0.21
-1.18
0.18
147.91
2,098.72
2,034.34
-1.53
0.24
5,974,665.473
651,959.275
0.33
-1.11
0.17
164.37
2,198.71
2,134.33
-1.81
0.37
5,974,665.199
651,959.404
0.05
-1.26
0.22
141.62
2,298.71
2,234.33
-2.10
0.53
5,974,664.909
651,959.569
0.09
-1.41
0.42
13168
2,398.71
2,334.33
-2.50
0.92
5,974,664.523
651,959.970
0.21
-1.51
0.37
119.23
2,498.71
2,434.33
-2.90
1.47
5,974,664.133
651,960.533
0.10
-1.51
0.39
86.28
2,598.71
2,534.33
-3.03
2.10
5,974,664.010
651,961.157
0.22
-1.27
0.45
47.85
2,698.71
2,634.33
-2.75
2.73
5,974,664.308
651,961.782
0.28
-0.67
1.67
3.97
2,798.69
2,734.31
-1.03
3.12
5,974,666.033
651,962.139
1.38
0.96
3.75
10.17
2,898.57
2,834.19
3.64
3.80
5,974,670.719
651,962.722
2.10
5.17
7.21
18.64
2,998.10
2,933.72
12.81
6.38
5,974,679.936
651,965.120
3.54
14.14
10.12
20.92
3,096.95
3,032.57
26.97
11.53
5,974,694.192
651,969.976
2.93
2867
11.95
23.75
3,195.10
3,130.72
44.65
18.83
5,974,712.019
651,976.922
1.91
47.33
13.91
28.65
3,292.56
3,228.18
64.68
28.77
5,974,732.242
651,986.448
2.24
69.41
16.07
28.85
3,389.15
3,32477
87.35
41,21
5,974,755.162
651,998.428
2.16
95.11
17.23
28.90
3,437.05
3,372.67
99.90
48.13
5,974,767.843
652,005.090
2.32
109.3.`
17.97
28.95
3,460.88
3,396.50
106.51
51.78
5,974,774.531
652,008.611
2.96
116.86
18.70
29.09
3,484.61
3,420.23
113.39
55.60
5,974,781.484
652,012.286
2.93
124.68
19.38
29.28
3,508.25
3,443.87
120.51
59.58
5,974,788.682
652,016.117
2.73
132.79
20.18
29.52
3,531.77
3,467.39
127.88
53.73
5,974,796.135
652,020.120
3.22
141.20
20.70
29.78
3,555.20
3,490.82
135.47
68.05
5,974,803.808
652,024.285
2.11
149.89
21.66
30.00
3,578.51
3,514.13
143.30
72.55
5,974,811.727
652,028.626
3.85
158.88
22.41
30.14
3,601.68
3,537.30
151 Al
77.25
5,974,819.937
652,033.160
3.01
168.22
23.30
30.20
3,624.72
3,560.34
159.81
82.13
5,974,828.428
652,037.868
3.56
177.89
24.18
30.19
3,647.60
3,583.22
168.51
87.19
5,974,837.227
652,042.753
3.52
187.92
24.87
30.08
3,670.35
3,605.97
177.48
92.40
5,974,846.305
652,047.779
2.77
198.25
25.75
29.79
3,692.95
3,628.57
186.74
97.73
5,974,855.673
652,052.923
3.55
208.90
6/132019 6.27 21AM Page 4 COMPASS 5000.1 Build BID
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB @ 64.38usft (F-348)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
T/DSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
lush)
P)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(1100usR)
(usft) _
3,748.74
26.69
29.36
3715.37
3,650.99
196.35
103.19
5,974,865.387
652,058.176
3.84
219.89
3,773.74
27.71
28.93
3,737.61
3,673.23
206.33
108.75
5,974,875.478
652,063.538
4.16
231.25
3,798.74
28.61
28.67
3,759.65
3,695.27
216.67
114.43
5,974,885.929
652,069.011
3.63
242.97
3,823.74
29.32
28.60
3,781.52
3,717.14
227.30
120.24
5,974,896.670
652,074.596
2.84
255.00
3,848.74
30.30
28.63
3,803.21
3,738.83
238.21
126.19
5,974,907.698
652,080.325
3.92
267.34
3,873.74
30.90
28.67
3,824.73
3,760.35
249.37
132.29
5,974,918.986
652,086.199
2.40
279.98
3,898.74
31.39
28.70
3,846.13
3,781.75
260.72
138.50
5,974,930.452
652,092.174
1.96
292.82
3,923.74
32.00
28.75
3,867.40
3,803.02
272.24
144.81
5,974,942.095
652,098.251
2.44
305.87
3,948.74
32.53
28.82
3,888.54
3,824.16
283.93
151.23
5,974,953.918
652,104.439
2.13
319.13
3,973.74
33.41
28.84
3,909.51
3,845.13
295.85
157.79
5,974,965.967
652,110.756
3.52
332.65
3,998.74
33.94
28.79
3,930.32
3,865.94
308.00
164.48
5,974,978.244
652,117.189
2.12
346.43
4,023.74
34.43
28.74
3,951.00
3,886.62
320.31
171.24
5,974,990.691
652,123.697
1.96
360.38
4,048.74
34.87
28.74
3,971.58
3,907.18
332.77
178.07
5,975,003.289
652,130.277
1.76
374.50
4,073.74
34,50
28.80
3,992.12
3,927.74
345.24
184.92
5,975,015.895
652,136.870
1.49
388.64
4,098.74
34.48
28.85
4,012.73
3,948.35
357.65
191.74
5,975,028432
652,143.442
0.14
40271
4,123.74
34.57
28.87
4,033.32
3,968.94
370.06
198.58
5,975,040.977
652,150.028
0.36
418.79
4,148.74
34.73
28.88
4,053.89
3,989.51
382.50
205.45
5,975,053.559
652,156.637
0.64
430.91
4,173.74
34.96
26.92
4,07441
4,010.03
395.01
212.35
5,975,066.201
652,163.285
0.92
445.11
4,198.74
34.83
28.97
4,094.91
4,030.53
407.52
219.27
5,975,078.853
652,169.951
0.53
459.32
4,223.74
34.67
28.99
4,115.45
4,051.07
419.99
226.17
5,975,091.455
652,176.601
0.64
47348
4,248.74
34.67
28.97
4,136.02
4,071.64
432.43
233.06
5,975,104.032
652,183.237
0.05
487.62
4,273.74
34.54
28.92
4,156.59
4,092.21
444.85
239.94
5,975,116.592
652,189.855
0.53
501.73
4,298.74
34.33
28.87
4,177.21
4,112.83
457.23
246.77
5,975,129.103
652,196.433
0.85
51578
4,323.74
34.47
28.87
4,197.84
4,133.46
469.60
253.59
5,975,141.607
652,203.000
0.56
529.82
4,348.74
34.48
28.91
4,218.45
4,154.07
481.99
260.42
5,975,154.132
652,209.584
0.10
543.88
4,373.74
34.55
28.97
4,239.05
4,174.67
494.39
267.28
5,975,166.664
652,216.186
0.31
557.96
4,398.74
34.27
29.03
4,259.67
4,195.29
506.74
274.13
5,975,179.156
652,222.782
1.13
572.00
6/13/2019 8:27.21AM Page 5 COMPASS 5000.1 Build BIO
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc Azi
TVD
TVDSS
NIS
ENV
Northing
Eating DLeg
V. Sec
(usft)
(°) (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
4423.74
34.19
29.05
4,280.34
4,215,96
519.04
280.95
5,975,191.586
652,229.358
0.32
585.98
4,448.74
34.03
29.04
4,301.04
4,236.66
531.29
287.76
5,975,203.977
652,235.914
0.64
599.92
4,473.74
33.99
29.02
4,321.77
4,257.39
543.52
294.55
5,975,216.338
652,242.450
0.17
613.82
4,498.74
33.93
29.02
4,342.50
4,278.12
555.73
301.32
5,975,228.683
652,248.976
0.24
627.70
4,523.74
33.98
29.05
4,363.24
4,298.86
567.94
308.10
5,975,241.026
652,255.503
0.21
641.58
4,548.74
34.19
29.08
4,383.94
4,319.56
580.19
314.90
5,975,253.407
652,262.060
0.84
655.51
4,573.74
33.83
29.10
4,404.67
4,340.29
592.41
321.70
5,975,265.761
652,268.609
1.44
669.41
4,598.74
33.71
29.12
4,425.45
4,361.07
604.55
328.46
5,975,278.035
652,275.121
0.48
683.23
4,623.74
33.81
29.12
4,446.23
4,381.85
616.69
335.22
5,975,290.306
652,281.634
0.40
697.04
4,648.74
33.75
29.11
4,467.01
4,402.63
628.83
341.99
5,975,302.583
652,288.150
0.24
710.86
4,673.74
33.74
29.07
4,487.80
4,423.42
640.96
348.74
5,975,314.852
652,294.654
0.10
724.67
4,698.74
33.60
29.01
4,508.61
4,444.23
653.08
35547
5,975,327.103
652,301.134
0.58
738.44
4,723.74
33.49
29.01
4,529.44
4,46506
665.16
- 362.17
5,975,339.317
652,307.587
0.44
752.18
4,748.74
33.55
29.10
4,550.29
4,485.81
677.23
368.87
5,975,351.518
652,314.046
0.31
765.90
4,773.74
33.42
29.26
4,571.14
4,506.76
689.27
375.60
5,975,363.693
652,320.524
0.63
779.61
4,798.74
33.31
29.39
4,592.02
4,527.64
701.26
382.33
5,975,375.814
652,327.013
0.52
793.29
4,823.74
33.25
29.44
4,612.92
4,548.54
713.21
389.07
5,975,387.897
652,333.507
0.26
808.94
4,848.74
33.30
29.42
4,633.82
4,569.44
725.16
395.81
5,975,399.976
652,340.003
0.20
820.58
4,873.74
33.16
29.39
4,654.73
4,590.35
737.09
402.53
5,975,412.044
652,346.485
0.56
834.21
4,898.74
33.23
29.37
4,675.65
4,611.27
749.02
409.25
5,975,424.104
652,352.957
0.28
847.82
4,923.74
32.96
29.36
4,696.59
4,632.21
760.92
415.94
5,975,436.133
652,359.406
1.08
861.40
4,948.74
32.82
29.38
4,717.59
4,653.21
772.75
422.60
5,975,448.095
652,365.824
0.56
874.91
4,973.74
33.00
29.43
4,738.57
4,674.19
784.58
429.27
5,975,460.060
652,372.252
0.73
88842
4,998.74
32.79
29.45
4,759.57
4,695.19
796.41
435.94
5,975,472.017
652,378.684
0.84
901.92
5,023.74
32.99
29.39
4,780.56
4,716.18
808.23
442.61
5,975,483.973
652,385.111
0.81
915.43
5,048.74
33.23
29.29
4,801.50
4,737.12
820.13
449.30
5,975,496.010
652,391.559
0.98
929.01
5,073.74
32.84
29.27
4,822.46
4,758.08
832.02
455.97
5,975,508.029
652,397.982
1.56
942.57
6/13/2019
8:27:21AM
Page 6
COMPASS 5000.1 Build BID
so
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F-348)
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation
Method:
Minimum Curvature
Design
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc Azi
TVD
TVDSS
NIS
EIW
Northing
Easgng DLeg
V. Sec
(usft)
(') (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100uaft)
(usft)
5.098.74
32.87
29.31
4,843.46
4,779.08
843.85
462.60
5,975,519.990
652,404,376
0.15
95605
5,123.74
32.56
29.28
4,864.49
4,800.11
855.63
469.22
5,975,531.904
652,410.746
1.24
969.49
5,148.74
32.30
29.11
4,885.59
4,821.21
867.34
475.76
5,975,543.737
652,417.047
1.10
982.82
5,173.74
32.43
28.90
4,906.71
4,842.33
879.04
482.24
5,975,555.569
652,423.297
0.69
996.13
5,198.74
32.63
28.78
4,927.79
4,863.41
890.82
468.73
5,975,567.473
652,429.541
0.84
1,009.48
5,223.74
33.02
28.76
4,948.80
4,884.42
902.70
495.25
5,975,579.481
652,435.821
1.56
1,022.95
5,248.74
33.33
28.73
4,969.72
4,905.34
914.69
501.83
5,975,591.605
652,442.155
1.24
1,036.54
5,273.74
33.74
28.66
4,990.56
4,926.18
926.81
508.46
5,975,603.851
652,448.539
1.65
1,050.26
5,298.74
34.02
28.59
5,011.32
4,946.94
939.04
515.14
5,975,616.216
652,454.966
1.13
1,064.10
5,323.74
34.40
28.54
5,031.99
4,967.61
951.38
521.86
5,975,628.694
652,461.435
1.52
1,078.06
5,348.74
34.74
28.47
5,052.58
4,988.20
963.85
528.63
5,975,641.293
652,467.950
1.37
1,092.15
5,373.74
35.07
28.42
5,073.08
5,008.70
976.43
535.44
5,975,654.006
652,474.507
1.32
1,106.35
5,398.74
35.75
28.53
5,093.45
5,029.07
989.16
542.35
5,975,688.875
652,481.153
2.73
1,120.73
5,423.74
36.36
26.80
5,113.67
5,049.29
1,002.07
549.41
5,975,679.925
652,487.948
2.52
1,135.35
5,448.74
37.23
29.11
5,133.66
5,069.30
1,015.17
556.66
5,975,693.170
652,494.930
3.56
1,150.23
5,473.74
37.96
29.33
5,153.49
5,089.11
1,028.48
564.10
5,975,706.628
652,502.104
2.97
1,16540
5,498.74
38.43
29.44
5,173.14
5,108.76
1,041.95
571.89
5,975,720.248
652,509.414
1.90
1,180.78
5,523.74
39.01
29.48
5,192.65
5,128.27
1,055.57
579.38
5,975,734.016
652,516.827
2.32
1,196.33
5,548.74
39.27
29.44
5,212.04
5,147.66
1,069.31
587.14
5,975,747.909
652,524.307
1.04
1,212.03
5,573.74
39.50
29.44
5,231.36
5,166.98
1,083.12
594,94
5,975,761.878
652,531.822
0.92
1,227.81
5,598.74
39.86
29.64
5,250.60
5,186.22
1,097.01
602.81
5,975,775.921
652,539.409
1.53
1,243.70
5,623.74
39.85
30.05
5,269.79
5,205.41
1,110.91
610.78
5,975,789.975
652,547.098
1.05
1,259.65
5,648.74
39.48
30.36
5,289.04
5,224.66
1,124.70
618.81
5,975,803.925
652,554.844
1.68
1,275.54
5,673.74
40.41
30.24
5,308.20
5,243.82
1,138.56
626.91
5,975,817.944
652,562.659
3.73
1,291.53
5,698.74
39.49
29.80
5,327.37
5,262.99
1,152.46
634.94
5,975,832.002
652,570.407
3.85
1,307.52
5,723.74
39.42
29.48
5,346.67
5,282.29
1,166.27
642.79
5,975,845.965
652,577.982
0.86
1,323.33
5,748.74
40.18
29.49
5,365.88
5,301.50
1,180.20
650.67
5,975,860.051
652,585.574
3.04
1,339.25
61132019
8:27:21AM
Page 7
COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation
Method:
Minimum Curvature
Design:
F -34C
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting DLeg
V. Sec
(usft) V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (o/loousft)
(usft) _
5,773.74
39.45
29.55
5,385.08
5,320.70
1,194.12
658.56
5,975,874.136
652,593.176
2.92
1,355.17
5,798.74
38.56
29.34
5,404.51
5,340.13
1,207.83
666.29
5,975,887.991
652,600.632
3.60
1,370.83
5,823.74
38.60
28.94
5,424.05
5,359.67
1,221.44
673.88
5,975,901.756
652,607.945
1.01
1,386.33
5,848.74
38.89
28.70
5,443.55
5,379.17
1,235.15
681.43
5,975,915.615
652,615.208
1.31
1,401.87
5,873.74
38.85
28.72
5,463.01
5,398.63
1,248.91
688.96
5,975,929.524
652,622.463
0.17
1,417.46
5,898.74
39.10
28.74
5,482.45
5,418.07
1,262.70
696.52
5,975,943.462
652,629.740
1.00
1,433.08
5,923.74
39.20
28.55
5,501.84
5,437.46
1,276.55
704.09
5,975,957.464
652,637.024
0.62
1448.76
5,948.74
39.19
28.29
5,521.21
5,456.83
1,290.45
711.61
5,975,971.507
652,644.260
0.66
1,464.45
5,973.74
39.55
28.16
5,540.54
5,476.16
1,304.42
719.11
5,975,985.628
652,651.474
1.48
1,480.18
5,998.74
39.65
28.13
5,559.80
5,495.42
1,318.47
726.62
5,975,999.828
652,658.704
0.41
1,496.00
6,023.74
39.68
28.03
5,579.02
5,514.64
1,332.58
734.15
5,976,014.085
652,665.943
0.95
1,511.86
6,048.74
40.02
27.79
5,598.18
5,533.80
1,346.77
741.67
5,976,028.419
652,673.168
0.83
1,527.78
6,073.74
39.69
27.48
5,617.37
5,552.99
1,360.96
749.10
5,976,042.759
652,680.309
1.54
1,543.66
6,098.74
40.37
27.22
5,638.52
5,572.14
1,375.24
756.48
5,976,057.187
652,687.405
2.80
1,559.58
6,123.74
39.76
26.98
5,655.65
5,591.27
1,389,57
763.81
5,976,071.656
652,694443
2.52
1,575.51
6,148.74
38.96
26.77
5,674.98
5,610.60
1,403.71
770.98
5,976,085.940
652,701.322
3.24
1,591.20
6,173.74
40.12
26.67
5,694.26
5,629.88
1,417.92
778.14
5,976,100.296
652,708.188
4.65
1,606.93
6,198.74
40.01
26.71
5,713.39
5,649.01
1,432.30
785.36
5,976,114.816
652,715.122
0.45
1,622,85
6,223.74
38.74
26.84
5,732.72
5,668.34
1,446.46
792.51
5,976,129.116
652,721.977
5.09
1,638.53
6,248.74
39.96
27.02
5,752.05
5,687.67
1,460.59
799.69
5,976,143.389
652,728.868
4.90
1,654.21
6,273.74
40.18
27.21
5,771.18
5,706.80
1,474.92
807.02
5,976,157.858
652,735.911
1.01
1,670.14
6,298.74
38.69
27.35
5,790.49
5,726.11
1,489.03
814.30
5,976,172.115
652,742.901
5.97
1,685.87
6,323.74
39.61
27.41
5,809.87
5,745.49
1,503.05
821.56
5,976,186.274
652,749.874
3.68
1,701.50
6,348.74
40.16
27.41
5,829.06
5,764.68
1,517.28
828.94
5,976,200.651
652,756.963
2.20
1,717.38
6,373.74
38.73
27.46
5,848.36
5,783.98
1,531.37
836.26
5,976,214.892
652,763.993
5.72
1733.12
6,398.74
39.59
27.59
5,867.75
5,803.37
1,545.37
843.55
5,976,229.036
652,771.003
3.46
1,748.76
6,423.74
39.87
27.65
5,886.97
5,822.59
1,559.53
850.96
5,976,243.340
652,778.123
1.13
1,764.60
6/13/2019
8:27,21AM
Page 8
COMPASS
5000.1 Build BID
BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate
Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB Q 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation
Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
Azl
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(daft) 11
1°I
(usft)
lusB)
lusft)
(osft)
(usft)
Wait) (°1100usft)
(usft)
6,448.74
38.59
2255
5,906.34
5,841.96
1,573.54
858.29
5,976,257.496
652,785.162
5.13
1,780.26
6,473.74
38.55
27.44
5,925.89
5,861.51
1,587.37
865.48
5,976,271.464
652,792.076
0.32
1,795.71
6,498.74
39.36
27.43
5,945.33
5,880.95
1,601.32
872.72
5,976,285.557
652,799.033
3.24
1,811.28
6,523.74
38.95
27.46
5,964.71
5,900.33
1,615.33
880.00
5,976,299.710
652,806.022
1.64
1,826.92
6,548.74
37.91
27.38
5,984.30
5,919.92
1,629.12
887.16
5,976,313.644
652,812.897
4.16
1,842.31
6,573.74
38.04
27.26
6,004.00
5,939.62
1,642.79
894.22
5,976,327.450
652,819.678
0.60
1,857.54
6,598.74
38,62
27.28
6,023.61
5,959.23
1,656.57
901.32
5,976,341.372
652,826.501
2.32
1,872.90
6,623.74
38.58
27.46
6,043.15
5,978.77
1,670.42
908.49
5,976,355.364
652,833.388
0.48
1,888.35
6,648.74
37.27
27.58
6,062.87
5,998.49
1,684.05
915.59
5,976,369.131
652,840.210
5.25
1,903.57
6,673.74
37.40
27.50
6,082.75
6,018.37
1,697.49
922.60
5,976,382.713
652,846.946
0.56
1,918.59
6,698.74
38.37
27.35
6,102.48
6,038.10
1,711.12
929.67
5,976,396.479
652,853-738
3.90.
1,933.80
6,723.74
37.13
27.23
6,122.25
6,057.87
1,724.72
936.69
5,976,410.219
652,860.478
4.97
1,94896
6,748.74
36.89
27.07
6,142.21
6,077.83
1,738.11
- 943.56
5,978,423.745
652,867.072
1.03
1,963.86
6,773.74
37.34
26.78
6,16215
6,097.77
1,751.56
950.39
5,978,437.330
652,873.628
1.93
1,978.78
6,798.74
37.66
26.43
6,181.98
6,11780
1,765.17
957.20
5,976,451.072
652,880.166
1.54
1,993.83
6,823.74
37.78
26.21
6,201.76
6,137.38
1,778.88
963.98
5,976,464.915
652,888.668
0.72
2,008.93
6,848.74
36.44
26.14
6,221.69
6,157.31
1,792.41
970.64
5,976,478.582
652,893.046
5.36
2,023.83
6,873.74
36.36
26.11
6,241.81
6,177.43
1,805.73
977.17
5,976,492.031
652,898.306
0.33
2,038.47
6,898.74
37.04
26.07
6,261.86
6,197.48
1,819.15
983.74
5,976,505.579
652,905.603
2.72
2,053.22
6,923.74
37.04
26.07
6,281.81
6,217.43
1,832.68
990.36
5,976,519.236
652,911.945
0.00
2,068.09
6,948.74
35.89
26.08
6,301.92
6,237.54
1,846.03
996.89
5,976,532.710
652,918.204
4.60
2,082.75
6,973.74
36.81
26.02
6,322.05
6,257.67
1,859.34
1,003.40
5,976,546.151
652,924.439
3.68
2,097.38
6,998.74
36.67
25.88
6,342.09
6,277.71
1,872.78
1009.94
5,976,559.727
652,930.709
0.65
2,112.14
7,023.74
36.05
25.74
6,362.22
6,297.84
1,886.13
1,016.39
5,976,573.196
652,936.890
2.50
2,126.76
7,048.74
36.78
25.62
6,382.34
6,317.96
1,899.50
1,022.82
5,976,586,698
652,943.048
2.93
2,141.39
7,073.74
36.71
25.50
6,402.37
6,337.99
1,912.99
1,029.28
5,976,600.318
652,949.226
0.40
2,156.13
7,098.74
35.72
25.37
6,422.54
6,358.16
1,926.33
1,035.62
5,976,613.781
652,955.298
3.97
2,170.68
6/132019
8.27:21AM
Page 9
COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project:
PBU
TVD Reference:
KB Q 64.38usft (F -34B)
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCPi
Survey
MD
Inc Azi
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft)
(°) (°l
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft) _
7,12374
36.62
25.29
6,442.72
6,378.34
1,939.67
1,041.93
5,976,627.241
652,961.338
3.60
2,185.22
7,148.74
35.68
25.27
6,462.91
6,390.53
1,953.00
1,048.23
5,976,640.700
652,967.364
3.76
2,199.74
7,173.74
36.38
25.21
6,483.13
6,418.75
1,966.31
1,054.50
5,976,654.125
852,973.363
2.80
2,214.22
7,198.74
36.33
25.07
8,503.26
6,438.88
1,979.72
1,060.80
5,976,667.664
652,979.385
0.39
2,228.81
7,223.74
35.26
24.92
6,523.54
6,459.16
1,992.97
1,066.98
5,978,881.038
652,985.294
4.29
2,243.19
7,246.74
35.50
24.81
6,543.92
6,479.54
2,006.11
1,073.06
5,976,694.291
652,991.112
0.99
2,257.43
7,273.74
36.33
24.69
6,564.17
6,499.79
2,019.42
1,079.20
5,976,707.729
652,996.980
3.33
2,271.85
7,298.74
35.35
24.52
6,584.43
6,520.05
2,032.73
1,085.30
5,976,721.159
653,002.804
3.90
2,286.23
7,323.74
35.05
24.36
6,604.86
6,540.48
2,045.86
1,091.26
5,976,734.397
653,008.500
1.29
2,300.39
7,348.74
35.82
24.26
6,625.23
6,560.85
2,059.06
1,097.23
5,976,747.724
653,014.197
3.09
2,314.62
7,373.74
35.17
24.26
6,645.58
6,581.20
2,072.30
1,103.19
5,976,761.075
653,019.891
2.60
2,328.87
7,398.74
35.22
24.51
6666.01
6,601.63
2,085.42
1,109.14
5,976,774.315
653,025.573
0.61
2,343.02
7,423.74
35.54
25.26
6688.40
8,622.02
2,098.55
1,115.23
5,976,787.566
653,031.396
2.16
2,357.25
7,448.74
35.31
26.57
6,706.77
6,642.39
2,111.59
1,121.56
5,976,800.724
653,037.463
3.17
2,371.55
7,473.74
35.17
28.07
6,727.19
6,662.81
2,124.40
1,128.18
5,976,813.670
653,043.821
3.51
2,385.83
7,498.74
36.80
29.08
6,747.42
6,683.04
2,137.30
1,135.21
5,976,826.706
653,050.586
6.94
2,400.42
7,523.74
38.13
29.17
6,767.26
6,702.88
2,150.58
1,142.61
5,976,840.136
653,057,716
5.32
2,415.54
7,548.74
39.17
28.54
6,786.78
6,722.40
2,164.26
1,150.15
5,976,853.961
653,064.971
4.45
2,431.06
7,573.74
40.10
27.78
6,806.04
6,741.86
2,178.32
1,157.67
5,976,868.169
653,072.209
4.20
2,446.88
7,598.74
40.47
27.33
6,825.11
6,760.73
2,192.65
1,165.15
5,976,882.648
653,079.394
1.88
2,462.90
7,623.74
40.58
27.22
6,844.11
6,779.73
2,207.09
1,172.59
5,976,897.233
653,086.543
0.52
2,478.99
7,648.74
40.47
27.25
6,863.11
6,798.73
2,221.53
1,180.03
5,976,911.823
653,093.683
0.45
.2,495.07
7,673.74
40.32
27.25
6,882.15
6,817.77
2,235.94
1,187.45
5,976,926.373
653,100.807
0.60
2,511.11
7,698.74
40.47
27.23
6,901.19
6,836.81
2,250.34
1,194.86
5,976,940.924
653,107.929
0.60
2,527.15
7,723.74
40.30
27.22
6,920.24
6,855.86
2,264.74
1,202.27
5,976,955.473
653,115.045
0.68
2,543.19
7,748.74
40.21
27.23
6,939.32
6,874.94
2,279.11
1,209.66
5,976,969.984
653,122.143
0.36
2,559.19
7,773.74
40.26
27.21
6,958.40
6,894.02
2,293.47
1,217.05
5,976,984.490
653,129.236
0.21
2,575.18
6/13/2019
8:27:21AM
Page 10
COMPASS
5000.1 Build 81D
an
BP
Final Survey Report
Company:
Project:
Site:
North America - ALASKA - BP
PBU
F
Local Coordinate Reference:
TVD Reference:
MD Reference:
Well F-34
KB @ 64.38usft (F -34B)
KB (off 64.38usft (F-348)
Well:
F-34
North Reference:
True
Wellbore:
Design:
F -34C
F -34C
Survey Calculation Method:
Database:
Minimum Curvature
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easdng
DLeg
V. Sec
(usft)
(°)
(%
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(01100usft)
(usft)
7,798.74
40.30
27.18
6,977.47
6913.09
2,307.84
1,22444
5,976,999.012
853,136.329
0.18
2, 591. if
7,823.74
40.07
27.18
6,996.57
6,932.19
2,322.19
1,231.80
5,977,013.507
653,143.405
0.92
2,607.15
7,848.74
39.60
27.19
7,015.77
6,951.39
2,338.44
1,239.12
5,977,027.897
653,150.431
1.88
2,623.00
7,873.74
40.01
27.23
7,034.98
6,970.60
2,350.67
1,246.44
5,977,042.274
653,157.458
1.84
2,638.85
7,898.74
39.49
27.40
7,054.20
6,989.82
2,364.88
1,253.77
5,977,056.823
653,164.504
2.12
2,654.68
7,923.74
39.76
27.79
7,073.45
7,009.07
2,379.01
1,261.16
5,977,070.898
653,171.601
1.47
2,670.48
7,948.74
40.22
28.33
7,092.61
7,028.23
2,393.18
1,268.72
5,977,085.225
653,178.870
2.30
2,686.42
7,973.74
40.36
28.78
7,111.68
7,047.30
2,407.36
1,276.45
5,977,099.578
653,186.307
1.29
2,702.48
7,998.74
40.21
28.97
7,130.75
7,066.37
2,421.54
1,284.25
5,977,113.887
653,193.824
0.78
2,718.54
8,023.74
39.94
28.92
7,149.88
7,085.50
2,435.62
1,292.04
5,977,128.125
653,201.326
1.09
2,734.54
8,048.74
39.96
28.81
7,169.04
7,104.66
2,449.68
1,299.79
5,977,142.337
853,208.789
0.29
2,750.49
8,073.74
39.89
28.77
7,188.21
7,123.83
2,463.74
1,307.52
5,977,158.551
653,216.229
0.30
2,76643
8,098.74
39.77
28.80
7,207.41
7,143.03
2,477.78
1,31523
5,977,170.737
653,223.653
0.49
2,782.34
8,123.74
39.72
28.84
7,226.64
7,162.26
2,491.78
1,322.93
5,977,184.894
653,231.072
0.22
2,798.22
8,148.74
39.69
28.88
7,245.87
7,18149
2,505.77
1,330.64
5,977,199.033
653,238.495
0.16
2,814.09
8,173.74
39.31
28.99
7,265.16
7,200.78
2,519.69
1,338.34
5,977,213.102
653,245.905
1.55
2,829.90
8,198.74
39.53
29.20
7,284.47
7,220.09
2,533.56
1,346.06
5,977,227.127
653,253.341
1.03
2,845.68
8,223.74
40.21
29.45
7,303.66
7,239.28
2,547.53
1,353.90
5,977,241.254
653,260.905
2.79
2,861.62
8,248.74
40.86
29.63
7,322.66
7,258.28
2,561.67
1,361.92
5,977,255.548
653,268.627
2.64
2,877.79
8,273.74
41.15
29.67
7,341.53
7,277.15
2,575.92
1,370.03
5,977,269.964
653,276.450
1.16
2,894.11
8,298.74
41.00
29.60
7,360.37
7,295.99
2,590.20
1,378.15
5,977,284.402
653,284.281
0.63
2,91046
8,323.74
41.05
29.52
7,379.23
7,314.85
2,804.47
1,386.25
5,977,296.836
653,292.085
0.29
2,926.79
8,348.74
40.73
29.48
7,398.13
7,333.75
2,618.72
1,394.31
5,977,313.239
653,299.853
1.28
2,943.07
8,373.74
40.52
29.46
7,417.11
7,352.73
2,632.89
1,402.31
5,977,327.569
653,307.571
0.84
2,959.26
6,398.74
40.41
29.39
7,436.13
7,371.75
2,647.02
1,410.29
5,977,341.858
653,315.254
0.48
2,975.40
8,423.74
40.38
29.24
7,455.17
7,390.79
2,661.15
1,418.22
5,977,356.141
653,322.898
0.41
2,991.51
8,448.74
40.70
29.09
7,474.17
7,409.79
2,675.34
1,426.14
5,977,370.487
653,330.527
1.34
3,007.67
6/132019 827:21AM Page 11 COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB (off 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellbore:
F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCPI
Survey
MD
Inc
Aad
TVD
TVDSS
NIS
E(W
Northing
Easting DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (-1100usft)
(usft)
847374
40.89
29.00
7,493.09
7,428.71
2,689.61
1,434.07
5,977,384.923
653,338.165
0.80
3,023.91
8,498.74
40.66
28.99
7,512.02
7,447.64
2,703.90
1,441.98
5,977,399.361
653,345.788
0.92
3,040.14
8,523.74
40.72
28.96
7,530.98
7,466.60
2,718.15
1,449.88
5,977,413.776
653,353.392
0.25
3,056.34
8,548.74
39.99
28.84
7,550.03
7,485.65
2,732.33
1,457.70
5,977,428.102
653,360.926
2.94
3,072.43
8,573.74
40.74
28.60
7,569.08
7,504.70
2,746.53
1,465.48
5,977,442.455
653,368.417
3.06
3,086.51
8,598.74
41.07
28.32
7,587.97
7,523.59
2,760.92
1,473.28
5,977,457.001
653,375.924
1.51
3,104.77
8,623.74
41.30
28.12
7,606.79
7,542.41
2,775.42
1,481.07
5,977,471.660
653,383.412
1.06
3,121.10
8,648.74
41.21
28.01
7,625.58
7,561.20
2,789.97
1,488.82
5,977,486.360
653,390.871
0.46
3,137.46
8,673.74
40.76
27.97
7,644.46
7,580.08
2,804.45
1,496.52
5,977,500.991
653,398.271
1.80
3,153.72
8,698.74
41.10
27.95
7,663.34
7,598.96
2,818.92
1,504.20
5,977,515.609
653,405.654
1.36
3,169.97
8,723.74
40.46
27.93
7,682.27
7,617.89
2,833.34
1,511.85
5,977,530.186
653,413.011
2.56
3,186.16
8,748.74
40.72
27.92
7,701.26
7,636.88
2,847.71
1,519.46
5,977,544.708
653,420.335
1.04
3,202.29
8,773.74
40.69
27.91
7720.21
7,655.63
2,862.12
1,527.10
5,977,559.266
653,427.674
0.12
3,218.46
8,798.74
40.27
27.89
7,739.23
7,674.85
2,876.46
1,534.69
5,977,573.759
653,434.975
1.68
3,234.56
8,823.74
40.37
27.87
7,758.29
7,693.81
2,890.76
1,542.26
5,977,588.207
853,442.248
0.40
3,250.60
8,848.74
40.48
27.88
7,777.32
7,712.94
2,905.09
1,549.84
5,977,602.687
653,449.535
0.44
3,266.68
8,873.74
40.74
27.94
7,796.30
7,731.92
2,919.47
1,557.45
5,977,617.217
653,456.858
1.05
3,282.81
8,898.74
40.68
28.02
7,815.25
7,750.87
2,933.87
1,565.10
5,977,631.768
653,464.215
0.32
3,298.99
8,923.74
40.64
28.06
7,834.21
7,769.83
2,948.25
1,572,76
5,977,646.296
653,471.579
0.19
3,315.15
8,948.74
40.98
28.05
7,853.13
7,788.75
2,962.67
1,580.44
5,977,660.867
653,478.969
1.36
3,331.36
8,973.74
41.30
27.99
7,871.96
7,807.58
2,977.19
1,588.17
5,977,675.539
653,486.399
1.29
3,347.67
8,998.74
4141
27.90
7,890.73
7,626.35
2,991.78
1,595.91
5,977,690.283
653,493.842
0.50
3,364.05
9,023.74
41.41
27.83
7,909.48
7,845.10
3,006.40
1,603.64
5,977,705.055
653,501.272
0.19
3,380.45
9,048.74
41.20
27.77
7,928.26
7,863.88
3,021.00
1,611.34
5,977,719.804
653,508.670
0.85
3,396.81
9,073.74
41.15
27.71
7,947.08
7,882.70
3,035.56
1,619.00
5,977,734.522
653,515.034
0.25
3,413.13
9,098.74
40.88
27.66
7,965.94
7,901.56
3,050.09
1,626.62
5,977,749.201
653,523.360
1.09
3,429.39
9,123.74
40.86
27.61
7,984.84
7,920.46
3,064.58
1,634.21
5,977,763.843
653,530.652
0.15
3,445.61
6113/2019
8:2721AM
Page 12
COMPASS
5000.1 Build BID
M
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well F-34
Project:
PSU
TVD Reference:
KB @ 64.38usft (F -34B)
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well:
F-34
North Reference:
True
Wellborn:
F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc Azl
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft)
(°) (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (Wousft)
(usft)
9,145.74
40.69
27.58
8,003.78
7,939.40
3,079.05
1,641.77
5,977,778.462
653,537.920
0.68
3461.7°
9,173.74
40.49
27.57
8,022.76
7,958.38
3,093.47
1,649.30
5,977,793029
653,545.155
0.80
3,477.91
9,198.74
40.57
27.58
8,041.76
7,977.38
3,107.87
1,656.82
5,977,807.578
653,552.382
0.32
3,494.00
9,223.74
40.27
27.60
8,060.80
7,996.42
3,122.24
1,664.33
5,977,822.092
853,559.596
1.20
3,510.07
9,248.74
40.21
27.59
8,079.88
8,015.50
3,136.55
1,671.81
5,977,836.553
653,566.785
0.24
3,526.07
9,273.74
40.06
27.58
8,098.99
8,034.61
3,150.83
1,679.27
5,977,850.983
653,573.956
0.60
3,542.04
9,298.74
40.04
27.63
8,118.13
8,053.75
3,165.09
1,686.73
5,977,855.385
653,581.119
0.15
3,557.98
9,323.74
40.16
27.79
8,137.25
8,072.87
3,179.35
1,694.21
5,977,879.789
653,588.316
0.63
3,573.95
9,348.74
40.50
28.07
8,156.31
8,091.93
3,193.64
1,701.79
5,977,894.234
653,595.602
1.54
3,589.99
9,373.74
40.95
28.38
8,175.26
8,110.88
3,208.01
1,709.51
5,977,908.757
653,603.023
1.97
3,606.18
9,398.74
41.26
28.65
8,194.09
8,129.71
3,222.45
1,717.35
5,977,923.354
653,610.575
1.43
3,622.50
9,423.74
41.26
28.82
8,212.89
8,148.51
3,236.91
1,725.28
5,977,937.967
653,618.206
0.45
3,638.88
9,448.74
41.13
28.91
8,231.70
8,167.32
3,251.33
1,733.23
5,977,952.544
653,625.860
0.57
3,655.24
9,473.74
40.91
28.93
8,250.56
8,186.18
3,265.69
1,741.18
5,977,967.063
653,633.501
0.88
3,671.55
9,498.74
40.91
28.90
8,269.45
8,205.07
3,280.02
1,749.08
5,977,981.550
653,641.125
0.08
3,687.82
9,523.74
40.53
28.85
8,288.40
8,224.02
3,294.30
1,756.95
5,977,995.987
653,648.709
1.53
3,704.03
9,548.74
40.35
28.81
8,307.43
8,243.05
3,306.51
1,764.77
5,978,010.348
653,656.239
0.73
3,720.14
9,573.74
40.17
28.78
8,326.51
8,262.13
3,322.67
1,772.56
5,978,024.660
653,663.732
0.72
3,736.20
9,598.74
39.88
28.77
8,345.65
8,281.27
3,336.76
1,780.30
5,978,038.906
653,671.183
1.16
3,752.17
9,623.74
39.61
28.77
8,364.87
8,300.49
3,350.77
1,787.99
5,978,053.069
653,678.591
1.08
3,768.05
9,648.74
39.22
28.77
8,384.19
8,319.81
3,364.69
1,795.63
5,978,067.134
653,685.946
1.56
3,783.82
9,673.74
38.71
28.70
8,403.63
8,339.25
3,378.47
1,803.19
5,978,081.068
653,693.223
2.05
3,799.44
9,698.74
38.59
28.46
8,423.15
8,358.77
3,392.18
1,610.66
5,978,094.927
653,700.412
0.77
3,814.95
9,723.74
39.02
28.01
8,442.63
8,378.25
3,405.99
1,818.07
5,976,108.876
653,707.542
2.06
3,830.50
9,748.74
39.80
27.36
8,461.95
8,397.57
3,420.04
1,825.44
5,978,123.076
653,714.629
3.53
3,846.23
9,773.74
41.25
26.53
8,480.95
8,416.57
3,434.52
1,832.80
5,978,137.703
653,721.692
6.19
3,862.30
9,798.74
42.38
25.56
8,499.58
8,435.20
3,449.50
1,840.12
5,978,152.822
653,728.704
5.21
3,878.75
6/134019 8:27:21AM Page 13 COMPASS 5000.1 Build 81O
a
P
ry
m
O
N
Q
N
M
M
v
N
b
n
o
n
n
m
m
n
N
b
Q
M
m
v
m
m
P
o
N
n
m
M
q
b
m
m
o
0
N
m
N
W
N
W
N
m
P
m
m
O
m
n
w
Q
N
M
W
Q
n
m
N
m
b
O
N
W
m
b
N
m
m
r
n
m
m
N
N
N
e
INO
N
O
m
w
m
m
W
w
W
o
0
0
0
0
N
v
N
m
m
ei
ei
n
of
m
ri
6
e
e
P
v
6
e
a
6
6
e
6
e
v
e
N
Q
w
N
m
b
r
O
M
W
N
N
N
mm
n
N
P
IO
p
P
n
Q
a
m
m
N
O
W
N
N
N
N
N
N
N
w
Q
m
n
d
a
V
e7
O
e
P
m
t7
N
W
P
P
O
O
f
N
Y
N
N
M
Ol
N
g
O
Z
�
U
Q
w
�
O
j O
0 O
m m
LL LL m
(7
m
N
m
n
N
m
W
N
m
m
m
m
W
m
m
N
Q
N
N
m
� j G
N
P
Q
N
m
W
O
m
Cl
P
N
N
N
Q
l7
N
W
m
l7
m3
m
01
o
y
m
(7
P
Q
N
m
m
n
n
m
W
o
ri
LL � K
5 x
ri
m
m
m
ei
ai
n
w
N
ei
N
of
N
m
N
of
N
ri
N
ri
N
of
N
M
m
m
N
M
N
N
of
N
ei
N
ri
N
m N
N
N
N
N
N
N
N
m
N
N
n
O
N
t+1
N
N
m
l7
Q
n
b
O
N
P
r
m
n
N
(7
m
N
n
W
n
Q
N
N
N
m
C!
w
m
N
N
m
w
13
P
N
n
W
O
m
N
N
N
m
b
n
N
mj
m
Q
O
m
M
O
n
P
q m
m
O
N
N
W
N
N
N
m
N
m
N
O
m
N
m
m
m
N
Cf
n
W
W
m
Q
P
Q
P
P
N
N
N
N
C{�
y
C
C W
m
0
m
0
Ol
m
m
at
m
m
m
m
m
m
n
0
r
m
0
n
0
r
b
n
ml
n
Ol
n
0
n
d
�� w
mi n
n
W
n
W
n
W
n
W
n
w
n
w
n
W
n
w
n
m
n
w
n
W
n
w
n
m
m
m
n
m
m
m
W
w
w
W
C
4 O
io M1'
V d C73m
W
N
N
m
n
n
m
N
O
r
M
W
N
M
O
m
N
O
N
O
m
m
E C C i V
N
m
w
N
O
N
O
P
O!
M
m
W
M
m
m
N
1
M
m
N
Q
0
W
W
O`
r
NN
lk
M
m
1`r]
m
Ol
N
N
O` V m
V d T N
P
m
N
m
m
m
b
m
n
m
n
m
m
m
m
O
W
W
A
0
W
W
Wm
w
w
W
W
W
W
V Q `
m
>O o
q 0
r
O
m
m
m
N
NO
m
O
O
m
N
O
M
P
M'
b
N
W
m
W
e
O
W
O
Q
N
M
O
O
n
O
m
M
n
O
N
n
n
N
n
n
m
M
a
m
O
m
O
m
m
W
M
W
N
m
Q
M
m
O
m
0
W
VI
M
M
N
N
O
r
O
m
QI
O
UI
N
N
M
n
P
M
n
N
O
O
M
OI
N
W
m
P
P
Q
N
N
N
N
N
N
m
m
m
m
m
n
n
n
n
n
m
m
m
m
00 Z
=
U)
m
c
LL
N
fnp
n
Q
N
O
Q
M
N
Q
N
�
N
P
m
N
O
N
Q
N
m
O
N
m
N
m
O
w
N
N
W
N
m
W
m
N
N
M
W
N
n
m
N
O
N
N
m
Q
N
m
r
W
N
Q
b
n
W
O
N
P
N
N
m
N
^
m
P
P
P
N
N
N
N
N
N
m
m
10
mm
m
n
m
3
a;
W
W
N
O
Q
m
N
N
m
P
W
M
N
O
m
M
W
f
m
Q
w
m
W
n
m
Q
m
N
N
m
e
r
M
W
O
m
m
P
N
N
N
e
N
N
M
N
N
N
n
N
m
N
O
b
N
m
PN
m
m
n
m
W
m
O
n
N
r
Q
r
N
n
n
r
n
n
W
n
O
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
0
m
m
m
m
m
m
m
m
v
N
Q
N
b
n
O
N
M
P
m
N
O
W
n
e
N
N
W
W
W
n
m
n
N
W
N
N
m
W
N
O
N
W
W
r
M
N
N
W
m
N
n
N
W
m
m
t!
b
m
O
N
O
0
0
N
N
N
M
m
ebi
m
Q
a
m
Q
m
m
m
n
M
n
m
n
O
m
O
w
O
b
b
e
n
N
O
m
W
O
W
N
P
m
tp
r
Q
CI
N
N
N
O
O
N
b
P
n
J
Qp
P
M
e
y
P
Q
Q
Q
N
P
N
P
b
Q
n
Q
m
e
w
P
w
Q
m
O
m
e
W
Q
O
N
N
N
N
M
m
M
n
M
m
O
W
Q
W
(]
y
C �
Q
4
ET
Q
r
3
o m m m
z a LL ii ii
Q
Q
e
e
Q
P
P
e
e
Q
Q
e
Q
Q
P
a
E o
m m
9y b
'm o
So
y Q
m
m
n
Cl
n
m1
n
el
n
b
n
Cl
n
41
n
M
n
m
n
Pl
n
m
n
CI
r
m
n
6
r
ml
n
M
n
m
o
26
a N
N
m
N
m N
6 N
M
C'1
n
�-
m
m
m
m
w
w
m
o
o
b
0
0
0
0
c
c
o
ico
W
of
mi
mi
m
of
of
of
d
o
0
0
y O C
O
U d N ?i ?i ❑
N
vI m m m m b e m N m m m w m w m m W A n w m W b
m m m pp pp m m m P m N A m O A CI P O w A A m O N b W
W C) l7 th m Q P P P P P N m m m m m m r A A A W m m m W
q O C T
p O w d y y j
clai'n33o m
N m m m p O O n m m y Py O N N O m mm m N O yN m � Op m m
Vml N P< th N N r � 0 0 0 Owi W N W W m W W O O O O O O O
�. m ac ra m m of m ae ae ro ro m m m m ru oe m m m m rc m m m m ae
a W N m P P m m m m P W m N Q O h N m m Q m h P O O
O V) O V) m N N N m m P m m W 0 0 0
N O w m m m r h m m m m m m m m m m m b m m r A m
m m m m r r n h h h m n h n r A n w r r r A r h A A
N m m m m m mQ O P N m@ m O m m b O m O W @N m r m P
6 � m
P N m m m o m h m Q n r m m P m m o w m W n m m m
w b m N P W N N N m n 01 N w m m n m P m m m m m m m
m o 0 0 0 0 0 m m m w w w m w m m m m m m m m m m m m
N m@ n O@ O O r O m m m 0 N N P m m N N r
P N m N m N m m N n m@ N N Vl N m @ m m Q m O m N N m
O O O m O �
@ O @@ m m b b n O m m W N m m @ n O m n O m m m
m m m m W w o 0 0
N
io
N
O
n
m
m
r
n W
O
r m
m
N
r
N
W
m
O
P
m
m
P
N
O
O
W
Es
W
O
w
b
P
W
W m
P
P O
m
O
N
n
r
O
m
O
m
W m
m
m
m
m
m
Z
Q
b
y
m
P
m
A
W
n
P
W
m
O m
b
m
O
N
P
N
w
O
O
P O
b
D
a
P
N
m
m
Cl
m
m
m
m
m
w
w
W
a
m
m m
m
w
w
W
w
m
w
w
w
m
W m
w
w
m
w
3 m
Q
N
O
01
N
0
m
N m
m
w W
r
r
O
VPI
W
O
m
W
r
m m
0
OR
n
r
Q
J
C Y 0
m
m
m
N
b
O
y
l'l b
Cl
Ol
w
P
m
Pee Em
w�hn
f
nnrnn
W
N m
W
�nnn�
Cl
� C V m
nnnn�
nnnnm
nn�nn
K
�' C ei
of
m
m
ri
of
ei ri
m
m ei
ni
ei
vi
of
of
m
m
w
ri
ei m
m
m
M
n
of
LL
—�� m E
m m W
m
m
m
W
W
N m
m
m m
m
m
W
N
W
Vl
W
W
m
W
m
m
N b
m m
W
m
m
m
m
m
N
m
m
m
7 0
g O m
m
W
m
m
W
m m
m
m m
m
m
m
m
m
m
W
W'
V
q O C T
p O w d y y j
clai'n33o m
N m m m p O O n m m y Py O N N O m mm m N O yN m � Op m m
Vml N P< th N N r � 0 0 0 Owi W N W W m W W O O O O O O O
�. m ac ra m m of m ae ae ro ro m m m m ru oe m m m m rc m m m m ae
a W N m P P m m m m P W m N Q O h N m m Q m h P O O
O V) O V) m N N N m m P m m W 0 0 0
N O w m m m r h m m m m m m m m m m m b m m r A m
m m m m r r n h h h m n h n r A n w r r r A r h A A
N m m m m m mQ O P N m@ m O m m b O m O W @N m r m P
6 � m
P N m m m o m h m Q n r m m P m m o w m W n m m m
w b m N P W N N N m n 01 N w m m n m P m m m m m m m
m o 0 0 0 0 0 m m m w w w m w m m m m m m m m m m m m
N m@ n O@ O O r O m m m 0 N N P m m N N r
P N m N m N m m N n m@ N N Vl N m @ m m Q m O m N N m
O O O m O �
@ O @@ m m b b n O m m W N m m @ n O m n O m m m
m m m m W w o 0 0
N
io
O
O
m
N
CI
O
m
m
C'1 m
m
m
O
n
b
N
b
m
P
m
w W
W
w
O
N
w
b
b
n
P
O
m
P w
W
b
N
N
W
O
Q
M
M
m
b W
b
O
W
b
y
m
P
m
A
W
n
P
W
m
O m
b
m
O
N
P
N
w
O
O
P O
b
b
P
P
N
m
m
Cl
m
m
m
m
m
w
w
W
a
m
m m
m
w
w
W
w
m
w
w
w
m
W m
w
w
m
w
O
C Y 0
m
m
m
N
b
O
y
l'l b
Cl
Ol
w
P
m
m
P
f
m
W
N m
W
W
Cl
� C V m
b
b W
P
b
m
m
4 m q
^
m
b
b
A
m
W
W
W
W
w
w
W
O
W
m
Q
m
m
N <
b@
N
N
O W m U m
O
W
m
m
w
b
m
b P
P
P
W
b
m
b
b
w
w
n
W
m
b
W
b
W
b
w
b
O O
W W
O
w
O
w-
O
O
W
V
J `L z m O
b
Q
O
m
n
m
m
w
P
O
b
O
m
b
m
N
N
r
7 m
N
N
.-
m
w
q!
m
O
m
m
b
b
N
m
m
N
m
Q
b r
m m
m
N
b
m
N
m
N N
Nb
n
O
m
b
W
n O
N
W
N
N
h
O
m
b
W
m b
W
N
b
b
w
w
W
O
O
O
O
^'
N
N
N
m
N
N
@
P
P
P
VI b
m
m
w
m
m p Cl
t7
�
P
P
P
P
P
Q
P P
P
P
P
P
Q
Q
Q
P
P
O
C P
P
P
P
Q
z 2
q O C T
p O w d y y j
clai'n33o m
N m m m p O O n m m y Py O N N O m mm m N O yN m � Op m m
Vml N P< th N N r � 0 0 0 Owi W N W W m W W O O O O O O O
�. m ac ra m m of m ae ae ro ro m m m m ru oe m m m m rc m m m m ae
a W N m P P m m m m P W m N Q O h N m m Q m h P O O
O V) O V) m N N N m m P m m W 0 0 0
N O w m m m r h m m m m m m m m m m m b m m r A m
m m m m r r n h h h m n h n r A n w r r r A r h A A
N m m m m m mQ O P N m@ m O m m b O m O W @N m r m P
6 � m
P N m m m o m h m Q n r m m P m m o w m W n m m m
w b m N P W N N N m n 01 N w m m n m P m m m m m m m
m o 0 0 0 0 0 m m m w w w m w m m m m m m m m m m m m
N m@ n O@ O O r O m m m 0 N N P m m N N r
P N m N m N m m N n m@ N N Vl N m @ m m Q m O m N N m
O O O m O �
@ O @@ m m b b n O m m W N m m @ n O m n O m m m
m m m m W w o 0 0
N
io
n b Q N N m m m N m W m n m W n n e W m Np mp m P m N
Q n m N N n O m m W W m W N N m W m W
W W W O O O N N N m W W P y Q P N N N N N m m
m L� Q P P N N N N N N N N N N N N N N N N N N N YI N N N N
m G;
a
oc
a
m a n 3 3 m W
W m n O m W n N W N O W p n N n^ N W N O W r
m O m O N Q W N m r m W n 1p N m m W O N m W m O
m m N N N N m N N N N N IA m VI N N m m m n n r m m m m
n n n n r r n n n n n n n r n r r r n n n n r r n n
� ci m m m m e6 m m m m m m of � m m m m ee m m m ¢i ru m m m
2
Q O O O W N n W N W Q W Q r O O W W P W O m W W
Cl W W N' 0 Oi Y O m W m t7 r M N n W f V P W N m Ol Q W
N W th W Q P N N W m m W r r n m W m W W
m O N O m O P W N w m m m Q O w N W P Q m ( w(pp N N
Vl N m N w w O O O r m m r m 0 W N Q m m m 0 m� b m m
w W w W W m m m w m m m m m m m m
r P W N m G N W m N m N W W N N W m W r O W W O N
P P W W m P O O W W m N N P pr W m W r W P �Pp O
N N r P m O W W
N N N l7 W W P P P P N N N b m m r n r W W m W W W W O
S �
7
g
Q
N
N
m
4
m
O O
N N
O
m
O
W
r
W
N
W
W
N
N
N
r
P
N
W
m
m
b
r
W N
O m
O
W
N
W
Q
N
m
r
N
m
N
W
P
W
m
W
N
O
O
W
n
N
m
N
as
U
W
m W
n W
P
n
P
fD N
O
Q
m
b
m
O
W
W
N
O
n
N
N
O
r
m
P
W
n N
N N
W
N
N
N
n
N
W
R
P
O
N
W m
W Q
b
n
m
Z
P W
Q
W
n
O
W
m
W
N
r
W
n
N
N O
O
W
O
W
W
r
m W
N
Vy'
W
m
Q
W A
W
N
W
0
P
r
W
N
n
Q
1%
pf
W
n
O
m
W
W W
P
m
N
m
W
W
W
m
n
m
n
W
n r
m W
r
m
p
Q
Q
P P
�
A J
J O
m
N
W
m
W
m
m
N N
m
N
N
p
N
N
m
N
�
Q
W
m w
0
0
W
W
pi
Oi
N
m
T
m
W
T
Oi
m
W
m
pi
m
Oi
m m
pi
pi
a
qI
m
m
Oi
m
Oi
m
W
m m
m
2
m
m
m CO
N N
m
N
m
N
Lim A a
m
N
m
N
m
m
N
N
m
N
w
N
N
m
N
N N
m
N
m
m
N
N
N
N m
N
C
A O
LL v J Y
N N q
m
m
O
W
r
Q
N
W
N
W
m
W r
O
N
W
P
C
N
m
m
m
N
N
m
N
j Q
Nq
m
O�
m
b
Q
O
m
m
O
P
m
r
W
O
W
9 C V J
O
O
mW
m
O
P
NN
m
W O
O
q
mJ mJ
Ifl
n
w
N
O
r
m
m
m W
m m
m
m
m
m
m m
m b
m
m
m
m
W
Q A
W
b
W
m
N W
N
N
W
O
N
m
n
m
N
m
O
m
W
O
m
P
Q
N
m
N N
W
W
O
O
O
O
N
N
P
N
N
N
N
qqN
�A
N
N
N
N
N
P
N
W
N
N
VWI
N N
N
N
y
N
N
VQI
N
N
p
1q
N
N
N
N
p
N
V V q E
Q
N
N
N
N
N
N
N
W Q
Q
22
N
N
N
N
N
N
N N
N
N
N
N
N
N
N N
N
O
o
F � Z N O
a
oc
a
m a n 3 3 m W
W m n O m W n N W N O W p n N n^ N W N O W r
m O m O N Q W N m r m W n 1p N m m W O N m W m O
m m N N N N m N N N N N IA m VI N N m m m n n r m m m m
n n n n r r n n n n n n n r n r r r n n n n r r n n
� ci m m m m e6 m m m m m m of � m m m m ee m m m ¢i ru m m m
2
Q O O O W N n W N W Q W Q r O O W W P W O m W W
Cl W W N' 0 Oi Y O m W m t7 r M N n W f V P W N m Ol Q W
N W th W Q P N N W m m W r r n m W m W W
m O N O m O P W N w m m m Q O w N W P Q m ( w(pp N N
Vl N m N w w O O O r m m r m 0 W N Q m m m 0 m� b m m
w W w W W m m m w m m m m m m m m
r P W N m G N W m N m N W W N N W m W r O W W O N
P P W W m P O O W W m N N P pr W m W r W P �Pp O
N N r P m O W W
N N N l7 W W P P P P N N N b m m r n r W W m W W W W O
S �
7
g
Q
N
N
m
4
m
m
N m
r
W
N
Q O
Q
b
W
m
r
W
N
m
b r
W
b
b
O
O
m
Q
a
m
P
W
m W
n W
P
n
P
fD N
O
Q
m
b
m
O
W
W
N
O
n
N
N
O
r
m
P
W
n N
N N
W
N
N
N
n
N
W
R
P
O
N
W m
W Q
b
n
m
N
P W
Q
W
n
O
W
m
W
N
r
W
n
N
N O
O
W
O
W
W
r
m W
N
Vy'
W
m
p b
O
W
N
W
0
P
r
W
N
n
Q
1%
pf
W
n
O
m
W
W W
P
m
N
m
W
W
W
m
n
m
n
W
n r
m W
r
m
p
Q
Q
P P
H
N
m
N
W
m
W
m
m
N N
m
N
N
p
N
N
m
N
�
Q
W
m w
0
0
W
W
pi
Oi
N
m
T
m
W
T
Oi
m
W
m
pi
m
Oi
m m
pi
pi
a
qI
m
m
Oi
m
Oi
m
W
m m
m
2
m
m
m CO
N N
m
N
m
N
m
m
m
N
m
N
m
m
N
N
m
N
w
N
N
m
N
N N
m
N
m
m
N
N
N
N m
N
C
A O
C
LL
N
C Y d C W
m
m
Q
Q
N n
m
Nq
m
1�
m
m
n
n
N r
m
m
m
0
O
n
W m
m m
N
r
W
9 C V J
O
O
mW
m
O
P
NN
m
W O
O
q
O
Ifl
n
w
N
O
r
m
m
m W
m m
m
m
m
m
m m
m b
m
m
m
m
W
Q A
W
b
W
m
N W
N
N
W
O
N
m
n
n
N
m
O
m
W
O
m
P
Q
N
m
N N
O
p A y U
m
O O
N
N
P
N
m
W
O
N
Q
n
W
N
N m
O
P
m
W
N
N
m
Q
V g T q
W W
W
W
W
W
W
W
W
O
O
O
Q
O
N
N
N
N
W
W
W Q
Q
22
N
N
N
N
N
N
N N
N
N
N
N
N
N
N N
N
O
o
F � Z N O
a
oc
a
m a n 3 3 m W
W m n O m W n N W N O W p n N n^ N W N O W r
m O m O N Q W N m r m W n 1p N m m W O N m W m O
m m N N N N m N N N N N IA m VI N N m m m n n r m m m m
n n n n r r n n n n n n n r n r r r n n n n r r n n
� ci m m m m e6 m m m m m m of � m m m m ee m m m ¢i ru m m m
2
Q O O O W N n W N W Q W Q r O O W W P W O m W W
Cl W W N' 0 Oi Y O m W m t7 r M N n W f V P W N m Ol Q W
N W th W Q P N N W m m W r r n m W m W W
m O N O m O P W N w m m m Q O w N W P Q m ( w(pp N N
Vl N m N w w O O O r m m r m 0 W N Q m m m 0 m� b m m
w W w W W m m m w m m m m m m m m
r P W N m G N W m N m N W W N N W m W r O W W O N
P P W W m P O O W W m N N P pr W m W r W P �Pp O
N N r P m O W W
N N N l7 W W P P P P N N N b m m r n r W W m W W W W O
S �
7
g
Q
N
N
m
4
m
m
N m
r
W
N
Q O
Q
b
W
m
r
W
N
m
b r
W
b
m
O
O
m
Q
a
m
P
O m
m
P
O
fD N
W
n
Q
N
Q
r
N
Q
Q
N N
W
N
m
N
m
r
K
n
n r
m
m
m
W W
m
m
o
0
0
0
0
d
m Q
Q
Q Q
Q
Q
Q
P Q
P
Q
N
N
N
N
N
N
m
N N
m
N
N
N
N
N
m
/1a
W Z
�
J
C
LL
N
m
m
Q
Q
N n
m
Nq
m
1�
m
m
n
n
N r
m
m
m
0
O
n
W m
m m
N
r
Q
m
Q
W
O
Q
N
N$
m
W O
O
q
O
Ifl
n
w
N
O
r
m
m
m W
m m
m
m
m
m
m
m
m m
m b
m
m
m
m
m
m
W
m
W
b
W
m
m
m
m
m
m m
r
O
n
r
n
n
r
r
m
a
oc
a
m a n 3 3 m W
W m n O m W n N W N O W p n N n^ N W N O W r
m O m O N Q W N m r m W n 1p N m m W O N m W m O
m m N N N N m N N N N N IA m VI N N m m m n n r m m m m
n n n n r r n n n n n n n r n r r r n n n n r r n n
� ci m m m m e6 m m m m m m of � m m m m ee m m m ¢i ru m m m
2
Q O O O W N n W N W Q W Q r O O W W P W O m W W
Cl W W N' 0 Oi Y O m W m t7 r M N n W f V P W N m Ol Q W
N W th W Q P N N W m m W r r n m W m W W
m O N O m O P W N w m m m Q O w N W P Q m ( w(pp N N
Vl N m N w w O O O r m m r m 0 W N Q m m m 0 m� b m m
w W w W W m m m w m m m m m m m m
r P W N m G N W m N m N W W N N W m W r O W W O N
P P W W m P O O W W m N N P pr W m W r W P �Pp O
N N r P m O W W
N N N l7 W W P P P P N N N b m m r n r W W m W W W W O
S �
7
g
Q
N
N
m
4
BP
bp Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project: PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Site: F
MD Reference:
KB @ 64.38usft (F-348)
Well: F-34
North Reference:
True
Wellbore: F -34C
Survey Calculation
Method:
Minimum Curvature
Design: F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°NOOusft)
(usft)
12,045.85
86.99
102.79
8,786.63
8,722.25
5,155.15
2,470.92
5,979,870.779
654,324.766
14.97
5,635.47
12,077.10
87.05
107.87
8,788.25
8,723.87
5,146.90
2,501.00
5,979,863.143
654,355.012
16.24
5,646.11
12,105.84
87.91
111.00
8,789.52
8,725.14
5,137.35
2,528.08
5,979,854.141
654,382.270
11.28
5,653.95
12,140.64
89.14
112.22
8,790.41
8,726.03
5,124.54
2,560.42
5,979,841.989
654,414.863
4.98
5,682.17
12,165.82
90.34
110.19
8,790.53
8,726.15
5,115.43
2,583.89
5,979,833.360
654,438.514
9.36
5,668.30
12,196.11
90.89
107.60
8,790.20
8,725.82
5,105.62
2,612.55
5,979,824.136
654,467.358
8.74
5,676.84
12,230.77
91.66
104.47
8,789.43
8,725.05
5,096.05
2,645.84
5,979,815.243
654,500.842
9.30
5,588.26
12,254.41
90.92
102.31
8,788.90
8,724.52
5,090.58
2,668.83
5,979,810.237
654,523.936
9.66
5,697.07
12,285.64
90.89
98.74
8,788.40
8,724.02
5,084.87
2,699.53
5,979,805.158
654,554739
11.43
5,710.14
12,316.09
93.44
96.90
8,787.25
8,722.67
5,080.73
2,729.67
5,979,801.630
654,584.956
10.32
5,724.17
12,343.93
90.86
96.36
8,786.21
8,721.83
5,077.52
2,757.30
5,979,798.979
654,612.645
9.47
5,737.51
12,376.46
87.61
94.64
8,786.64
8722.26
5,07441
2,789.68
5,979,796.519
654,645.071
11.30
5,753.67
12,407.04
89.02
91.64
8,787.54
8723.16
5,072.73
2,820.19
5,979,795.464
654,675.613
10.84
5,769.92
12,437.76
88.03
89.72
8,788.33
8,723.95
5072.37
2;850.90
5,979,795.721
854,706.318
7.03
5,787.36
12,465.99
88.43
87.67
8,789.21
8,724.83
5,073.01
2,879.11
5,979,796.935
654,734.505
7.40
5,804.18
12,497.72
88.00
85.41
8,790.20
8,725.82
5,074.92
2,910.76
5,979,799.490
654,766.112
7.25
5,824.0'
12,535.89
86.59
90.02
8,792.00
8,727.62
5,076.44
2,948.85
5,979,801.782
654,804.156
12.62
5,847.26
12,556.05
85.75
93.04
8,793.34
8,728.96
5,075.91
2,968.95
5,979,801,653
654,824.267
15.52
5,85844
12,585.20
87.60
96.32
8,795.04
8,730.66
5,073.53
2,997.95
5,979,799.866
654,853.305
12.90
5,873.25
12,614.78
89.85
99.36
8,795.69
8,731.31
5,069.50
3,027.24
5,979,796.428
654,882.670
12.78
5,886.87
12,645.93
91.38
102.37
8,795.36
8,730.98
5,063.83
3,057.83
5,979,791.179
654,913.365
10.84
5,899.75
12,676.43
89.54
105.56
8,795.11
8,730.73
5,056.27
3,087.42
5,979,784.421
654,943.099
12.07
5,910.83
12,706.64
91.75
104.20
8,794.77
8,730.39
5,048.51
3,116.61
5,979,777.258
654,972.440
8.59
5,921.36
12,738.31
92.46
101.62
8,793.61
8,729.23
5,041.44
3,147.46
5,979,770.815
655,003.421
8.44
5,933.41
12,772.04
92.00
98.24
8,792.30
8,727.92
5,035.63
3,180.65
5,979,765.678
655,036.724
10.11
5,947.84
12,795.56
92.06
95.50
8,791.46
8,727.08
5,032.82
3,203.99
5,979,763.340
655,060.109
11.65
5,959.02
12,828.70
91.54
93.17
8,790.42
8,726.04
5,030.32
3,237.01
5,979,761.507
655,093.177
7.20
5,976.05
6/132019 8:27:21AM
Page 17
COMPASS
5000,1 Build 81D
by
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well F-34
Project: Pau
TVD Reference:
KB @ 64.38usft (F -34B)
Site. F
MD Reference:
KB @ 64.38usft (F -34B)
Well: F-34
North Reference:
True
Wellbore: F -34C
Survey Calculation Method:
Minimum Curvature
Design: F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc An
TVD
TVDSS
NIS
E/W
Northing
Easdng OL99
V. Sec
(usft)
V) (°)
(usft)
(usft)
(usft)
(usft(
(usft)
(usft) (°/100usft)
(usft)
12,857.96
90.55
89.74
8,789.89
8,725.51
5,029.57
3,266.25
5,979,761.357
655,122.425
12.20
5,992.33
12,887.59
90.98
67.54
8,789.49
8,725.11
5,030.28
3,295.87
5,979,762.660
655,152.019
7.56
6,010.01
12,916.18
92.36
87.95
8,788.86
8,724.28
5,031.40
3,324.43
5,979,764.363
655,180.543
5.04
6,027.42
12,946.33
91.94
91.18
8,787.53
8,723.15
5,031.63
3,354.55
5,979,765.202
655,210.654
10.80
6,04501
12,975.93
69.91
94.32
8,787.05
8,722.67
5,030.21
3,384.11
5,979,764.381
655,240.231
12.63
6,060.92
13,005.94
90.43
97.55
8,786.96
8,722.58
5,027.11
3,413.95
5,979,761.884
655,270.131
10.90
6,075.63
13,035.65
92.70
99.06
8,786.15
8,721.77
5,022.82
3,443.34
5,979,758.191
655,299.594
9.18
6,089.10
13,066.54
96.72
101.81
8,783.61
8,719.23
5,017.25
3,473.60
5,979,753.234
655,329.967
15.75
6,102.03
13,095.81
96.09
107.06
8,780.35
8,715.97
5,010.00
3,501.76
5,979,746.558
655,358.264
17.95
6,112.38
13,133.00
96.09
107.06
8,776.40
8,712.02
4,999.15
3,537.12
5,979,736.426
655,393.827
0.00
6,123.94
Projection to TO
61IN2019 8..27.21AM Page 18 COMPASS 5000.1 Build BID
m
r+ 1hELLBORE DETAILS: F31C acFw[r+c[rtua+unnw
Prood; PWMgeFCMR'.M
SW: F pp eq,wenr F -31C coaeinma lM>:l aerereare waiF3l.T NoS
Nm: Fa4 T/ n.a0sr.fsr�r vgocailrvol aaie.�®: uwn SM MA
W4gbww P44C yml opxp:wa� F_UB sacwn rysl aeira�ar KB@R IMAM)
Aalutl: FA/C Mm�mvm e� Tam MD: 10188.74 Mwvrea W.,Wtm. rcaIiFmc mFlae1
CYwkbn MaTW. MlinnmCwe4e
AOGCC Offsets within 500ft
Easting (250 usNin)
by
North America - ALASKA - BP
PBU
F-34
F -34C
F -34C
500292198003
AOGCC Offset Well Report
13 June, 2019
0 ee
Company:
North America- ALASKA - BP
Project:
PBU
Reference Site:
F
Site Error:
0 00usft
Reference Well:
F-34
Well Error:
0.00usft
Reference Wellbore
F -34C
Reference Design:
F -34C
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well F-34
KB @ 64.38usft (F -34B)
KB @ 64.38usft (F -34B)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference
F -34C
Filtertype:
NO GLOBAL FILTER: Using user defined selection& filtering cetera
Interpolation Method:
MD Interva125.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tmv. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program
Date 6/13/2019
From
To
(usft)
(usft) Survey(Wellbore)
Tool Name
98.74
7,473.74 F-34 Srvy 2 GYD-CT-CMS (F-34)
GYD-CT-CMS
7,498.74
10,198.74 F -34B Srvy 2 GYD-CT-CMS (F -34B)
GYD-CT-CMS
10,208.00
13,133.00 Survey#1 (F -34C)
MWD
Desoription
Gyrodata wntcesing Ms
Gyrodata wnt.casing mts
MWD - Standard
6/13/2019 &57:41AM Page 2 of 4 COMPASS 5000.1 Build 81D
BP
by gnticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well F-34
Project:
PBU
ND Reference:
KB @ 64.38usft (F -34B)
Reference Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Site Error:
0.00usft
North Reference:
True
Reference Well:
F-34
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
F -34C
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
lush)
(usft)
(usk)
F
F-05 - F-05 - F-05
4,757.78
5,125.00
489.78
F-05 - F -05A- F -05A
4,757.78
5,125.00
489.78
F-05 - F -05B - F -05B
4,757.78
5,125.00
489.78
F-08 - F-08 - F-08
2,682.38
2,675.00
450.39
F-08 - F -08A - F -08A
2,682.38
2,675.00
450.39
F-08 - F -08B - F -08B
2,682.38
2,675.00
450.39
F-09 - F-09 - F-09
2,472.83
2,475.00
345.05
F-09 - F -09A - F -09A
2,472.83
2,475.00
345.05
F-09 - F -09B - F -09B
2,475.14
2,475.00
345.07
F-09 - F -09C - F -09C
2,475.14
2,475.00
345.07
F-10 - F-10 - F-10
2,672.12
2,675.00
199.02
F -10 -F -10A -F -10A
2,672.12
2,675.00
199.02
F-10 - F-1 OB - F-100
2,672.12
2,675.00
199.02
F-10 - F -10C - F -10C
2,672.12
2,675.00
199.02
F-10 - F-10CPB1 - F-tOCPB1
2,672.12
2,675.00
199.02
F-11 - F-11 - F-11
2,647.35
2,650.00
85.77
F -11 -F -11A -F -11A
2,647.35
2,650.00
85.77
F-11 - F -11B- F -11B
2,647.35
2,650.00
85.77
F-12 - F-12 - F-12
2,923.90
2,925.00
25.83
F-12 - F -12A - F -12A
28.71
28.34
35.02
F-13 - F-13 - F-13
3,504.99
3,475.00
114.89
F-13 - F -13A- F -13A
3,504.99
3,475.00
114.89
F-13 - F-138 - F -13B
3,488.46
3,475.00
114.58
F-13 - F-13BP81 - F-13BPBI
3,488.46
3,475.00
114.58
F-13 - F-1 3C - F-1 3C
3,488.46
3,475.00
114.58
F-14 - F-14. F-14
4,088.90
4,000.00
168.05
F-18 - F -18A - F -18A
10,190.83
10,575.00
143.87
F-20 - F-20 - F-20
2,760.92
2,775.00
365.40
F-21 - F-21 - F-21
4,709.25
4,825.00
229.67
F -21-F-21 Pet -F-21 Pet
5,164.57
5,300.00
227.65
F-29 - F-29 - F-29
2,670.92
2,675.00
307.98
F-29 - F -29A- F -29A
2,647.56
2,650.00
307.86
F-29 - F -29B - F -29B
2,647.56
2,650.00
307.86
F-29 - F-29BPB1 - F-29BPB1
2,647.56
2,650.00
307.86
F-30 - F-30 - F-30
1,117.55
1,125.00
132.35
F-30 - F -30A - F -30A
1,117.55
1,125.00
132.35
F-31 - F-31 - F-31
1,223.20
1,225.00
218.86
F-31 - F -31A- F -31A
1,223.20
1,225.00
216.88
F-31 - F-31APBI - F-31APB1
1,223.20
1,225.00
216.86
F-32 - F-32 - F-32
2,747.33
2,750.00
100.97
F-33 - F -33A - F -33A
11,365.10
11,100.00
271.38
F-33 - F-33APBI - F-33APB1
11,322.12
11,100.00
234.08
F-34 - F-34 - F-34
7,796.74
7,800.00
32.28
F-34 - F -34A - F -34A
8,750.19
8,775.00
39.35
F-34-F-34APB1-F-34APBI
8,750.19
8,775.00
39.35
F-34 - F -34B - F -34B
10,504.05
10,600.00
193.94
F-34 - F -34C - F -34C WP02
13,129.07
13,150.00
11.69
F-35 - F -35A - F -35A
13,119.54
13,800.00
301.52
F-36 - F-36. F-36
2,580.41
2,675.00
391.72
F-36 - F-361-1 - F-361-1
2,580.41
2,675.00
391.72
F-36 - F-361.2 - F -36L2
2,580.41
2,675.00
391.72
F-36 - F-361-3 - F-361.3
2,580.41
2,675.00
391.72
F-37 - F-37 - F-37
3,003.12
3,000.00
54.54
6/13/2019 8�57.41AM Page 3 of 4 COMPASS 5000.1 Build 81D
BP
�Ay
#. ; by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well F-34
Project:
PBU
TVD Reference:
KB @ 64.38usft (F -34B)
Reference Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Site Error:
0.00usft
North Reference:
True
Reference Well;
F-34
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
F -34C
Offset TVD Reference:
Offset Datum
Summary
2,987.78
3,000.00
54.43
6/132019 8:57:41AM Page 4 of 4 COMPASS 5000.1 Build 81D
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Dffset Well - Wellbore - Design
(usft)
(usft)
(usft)
F
F-37 - F -37A - F -37A
2,987.78
3,000.00
54.43
F-37 - F-37AU - F-37ALl
2,987.78
3,000.00
54.43
F-37 - F-37APB1 - F-37APB1
2,987.78
3,000.00
54.43
F-37 - F-37APB2 - F-37APB2
2,987.78
3,000.00
54.43
F-38 - F-38 - F-38
2,570.65
2,575.00
441.60
F-38 - F -38A - F -38A WPD3
2,570.65
2,575.00
441.60
F-39 - F-39 - F-39
1,449.32
1,450.00
178.17
F-39 - F -39L1 - F-39LI
1,449.32
1,450.00
178.17
F-39 - F-39L1-01XX - F-391_1-01
28.71
28.37
179.86
F41 - F-41 - F41
2,674.10
2,675.00
85.41
F-41 - F41 A - F -41A
2,674.10
2,875.00
85.41
F-41 - F41 PBI - F-41 PB1
2,674.10
2,675.00
85.41
F-42 - F42 - F-42
4,903.04
4,750.00
263.77
F-42 - F -42A - F -42A
4,902.67
4,750.00
263.77
F -48 -F -48-F48
1,499.36
1,500.00
217.11
F -48 -F -481_1-F-481.1 WP04
1,499.36
1,500.00
217.11
F48 -F -0811-01-F-481_1-01 WP04
1,499.36
1,500.00
217.11
UAT TEST SITE ONLY
TEST WELL X_WP-TEST WELL - TEST WELL
3,003.12
3,000.00
54.54
TEST WELL X_WP-TEST WELL A -TEST WELL
2,987.78
3,000.00
54.43
TEST WELL X_WP-TEST WELL AP81-TESTWELLAPBI
2,987.78
3,000.00
54.43
TEST WELL X WP -TEST WELL APB2-TEST WELLAPB2
2,987.78
3,000.00
54.43
6/132019 8:57:41AM Page 4 of 4 COMPASS 5000.1 Build 81D
Printed 7/2/2019 10:41:00AM
Pulp 1 of 2
North Amenc6- ALASKA -BP
Cementing Report
Common Well Name: F-34 / 03
Report ria.: 1 Report date: 6/9!2019
Proje 1 PBU
Site F
Spud Date/time: 10!7!1889 _
Event Type: COM- ONSHORE (CON)
Star! Date: 61812018 End Dale: 6/1 312019
AFE No.:
Contractor. NABORS ALASKA DRILLING INC.
Rig Name/No.: CDR -2 Rig Release: 611312019
X3-019CT-C-(1,331,514.00 )
BPUOI' USA0000D752
Active datum: KB 664.38usft (above Mean Sea Level)
General Information
Job type: Primary
Cement job start date/time'. 6/9/2019 3'. OOAM
Job end date/time: 6/9/2019 5 OOAM
Cementer. RICHARD GRANT
Cement Company: SCHLUMBERGER
Size'. 2.875 (in)
String Set Ti 13,133.00 (usft) Hole Size: 4.250 (in)
Cemented String: PRODUCTION LINER
1
String
Pipe Movement
Pipe Movement: NO MOVEMENT
RPM:
Rotating Torque (iniUavg/max): (ft-Ibf)
Rotating Time (Start -End):
Reciprocating Time (Start -End):
Recip Drag Up/Down: - (kip)
SPM: Stroke Length:
Fluid Name: CEMENT
Fluids (1 of 1)
Slurry Type. CEMENT
PRIMARY
Class:
G -CLASS Description: TAILSLURRV Density: 15.30 (ppg)
Purpose
Yield. 1.3100 (ft/sk)
Mix Water Rate:
4.305 (gal/sk94) Excess: 20.00(%) Mix Method: BATCH
Sacks Used: 165.50 (94ib sacks)
Water Volume:
17.0 (bbl) Excess Slurry Volume: 6.4
(bbl) Density Measured by: DENSOMETER
Total Vol in Well:
Slurry Volume: 38.6 (bbl) Excesa Measured From: EST. GAUGE HOLE
Other Volume.
Mud Type-.
Density:
PV:
YP: Viscosity:
Gels 10 Sec:
Gels 10 Min:
Additives
Name
Type
Amount
Units
Concentration Unit
5.000 %BWOC
D163
CEMENT
0.100 GALISX
D047
ANTIFOAM AGENT
0,100 GAL/SX
D206
ANTIFOAMAGENT
1.000 %BWOC
D065
DISPERSANT
1.500 GAL/SX
D600 G
GAS -BLOCK
0.100 %BWOC
D167
I GAS CONTROL AGENT
Fluid Tests
Thick time
Thick
Free water
Free water
Fluid loss
Fluid loss
Fluitl loss
Comp
Comp
Comp
Comp
Comp Strength
Pressure 2
Comp Strength
Temperature 2
(hr)
temp.
(%)
temp.
(cd30min)
temp.
press.
Strength
Strength
Strength
Strength Time
(psi)
('F)
(`F)
(`F)
(^F)
(psi)
Time 1
Pressure 1
Tempe ature 1
°F
2
(min)
si
min
6.35
186.00
0.00
80.00
48.0
180.00
Printed 7/2/2019 10:41:00AM
Printed 7122019 10:41:OOAM
Page 2 of 2
North America - ALASKA - BP
Cementing Report
Report —no.t TReport date : 6/9/2019
Common Wall Name: F-34 / 03
– _PBU __--
1 Site. F
,Spud Date/Time: 10/1/1989 -
_– --
Prolett
_.--
Date. 6/13/2019
AFE No.:
Event Type: COM- ONSHORE (CON)
Start Date' 6/62019 .End
Contractor: NABORS ALASKA DRILLING
INC.
Rig Name/No.' CDR-2 Rig Release'. 6/13/2019–1.%3-019CT-C:
1,331,614.00 )
8PUO1: USA00000762
Active datum: KB ®64.36ustt (above Mean Sea Level)
Stages
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
TopBottom
Plug
Pressu-
Doet
Pressure
Rawms
Circulate
Cmt Vol to
TOfel
Annular
M.
(usft)
(usft)
Rate
Press.
Plug
Plug
gumpea
gumpea
Held
Ham
Prior
Surface
Lost
Flaw
After
(gpm)
(psi)(hr)
(psi)
(min)
(bbl)
(bbl)
1
PRIMARYCEMENT
9,613.00
13,133.
1
v
y
Pumping Schedule
Fluid pumped
Volume
I Avg.
Max Disp.
I SlurryTop Slurry Base Start Mix Cmt
Start Slurry
Pumping end
Start Dill
Foam Gas Type
Gas Vol
BH circ.
Bh static
Pumpetl
Disp.
Rete
TMD TMD
Pmp
date/time
job
Used
temp.
temp.
(UbQ
Rate
(bbVmin)
(usft) (usft)
bbVmin
Teeb
Casing Test
Shoe Test
Liner Top Test
Test Pressure: (psi)
FIT/LOT'.
(ppg) Liner Overlap:
(usft)
(min)
Tool:
N Positive Test'
(ppg)
Positive Test Tool:
N
Time:
Cement Found between Shoe and Collar
N
Open Hole
Length: (usft) Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr) Time before test.
(hr)
Cmt Found on Tool'.
N
Log/Survey, Evaluation
Interpretation Summary
CBL Run: N
Cement Top:
(usft)
Under Pressure: (psi)
How Determined:
Bond Quality:
TOC Sufficient:
N
CET Run: N
Job Rating:
Bond Quality
If Unsuccessful, Detection Indicator:
Remedial Cement Required:
N
Temp Survey: N
Him Prior to Log: (hr)
How Determined:
Printed 7122019 10:41:OOAM
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Sean M. McLaughlin
CTD & RWO SDE
BP Exploration (Alaska), Inc.
P.O Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
ww .aogcc.alaska.gov
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU F -34C
BP Exploration (Alaska), Inc.
Permit to Drill Number: 218-164
Surface Location: 2133' FNL, 2412' FWL, SEC. 02, TI IN, R13E, UM
Bottomhole Location: 2838' FSL, 797' FWL, SEC. 36, T12N, R13E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
A
DATED this I y day of December, 2018.
STATE OF ALASKA
4SKA OIL AND GAS CONSERVATION COMMISSIt
PERMIT TO DRILL rrr r
20 AAC 25.005
la. Type of Work:1b.
Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑
1c. Specify if well is proposed for:
Drill 13Lateral ❑
Stratigraphic Test ❑ Development -Oil 0 • Service-Winj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hydrates❑
Redrill 0. Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 "Single Well ❑
11. Well Name and Number.
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU F -34C -
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 13280' TVD: 8706'ss
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of WellGovernmental Section):
(
7 Pro pert/ Designation (Lease Number):
• ADL 028280 & 028277 -
8 DNR Approval Number:
13. Approximate spud date:
Surface: 2133' FNL, 2412' FV&, Sec. 02, Tl1 N, R13E, UM
1551' FSL, 4340 F%NL, Sec. 35, T12N, R13E, UM
87-035
December 19, 2018
Top of Productive Horizon :
9. Acres in Property: 2560
14. Distance to Nearest Property:
Total Depth: 2838' FSL, 797' FWL, Sec. 36, T12N, R13E, UM
4500
4b Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 64.38. feet
15, Distance to Nearest Well Open
t Same Pool:
Surface: x- 651959 . y- 5974667 " Zone - ASP 4
GL bove Elevation aMSL: 35.99 feet
15
16. Deviated wells: Kickoff Depth: 10210 ' feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees
Downhole: 3203 Surface: 2323 -
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade Couolina Len th
MD TVD MD TVDinclutlin sta etlata
4-1/2" 3-1/4"x2-7/8" 6.6#16.5# L-80 TCII/STL 3670'
9610' 8290'ss 13280' 8706'ss 186 sx Class'G'
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk( measuretl):
10850 9082
None
10762
9042
None
Casing Length Size Cement Volume MD TVD
Conductor(Structural 80 20" 30-110 30-110
Surface 2658 133/6" 3723 cu 8 Permafrost 30-2688 30-2688
Intermediate 7454 9-sre' 2059 ou it Class'G' 29-7483 29-6735
Liner 2809 7" 472 cu It LiteCrete. 281 cu ft Class'G' 7333-10142 6613-8737
Liner 2356 41/2" 236 cu ft Class'G' 8494-10850 7508-9082
Perforation Depth MD (ft): 10635 -10735 Perforation Depth TVD ft): 8987-9030
Hydraulic Fracture planned? Yes ❑ No ❑
20. Attachments Properly Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22, 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Hartlev. Josephine
from without prior written approval.
Contact Email Josephine.HartleyObp.com
Authorized Name Mclaughlin, Sean M
Authorized Tille CTD & RIND SDE Contact Phone +1 9075644570
Authorized Signature iL/` Date I 17.1412!
Commission Use Only
Permit to Drill
11
API: 50- 029-21980-03-00
Permit App
vat,
-G
See cover letter for other
Number:
pale:
requirements:
Conditions of approval : If box is checked. well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Other. b Samples req'd: Yes No UthMud log req'd: Yes ❑/ No Q
,❑/
H2S measures Yes L7 No Directional svy req'd: Yes !8- No ❑
Spacing exception req'd: Yes No i!/ Inclination -only svy req'd Yes ❑ No ii
•❑
P LLGewEn1"r' P�(L ro A III u 1) Post initial injection MIT req'd: Yes ❑ No ❑
Q>4 eeveD Ary -spy -E p Loc-
APPROVED BY
1t�'
Approved by: COMMISSIONER THE COMMISSION Dale: tZl t`,
ir)�1I
Formt0-4ot Revised 5/2017 This permit is valid f 4 nfhs"lforrl the a Liproval (20 AAC 25.005(8)) Submit and
Attachments
enlsinDuplicate
To: Alaska Oil & Gas Conservation Commission
From: Josi Hartley
CTD Engineer
Date: November 29, 2018
Re: F -34C Permit to Drill Request
1•'ti'W by
00"e
Approval is requested for a permit to drill a CTD sidetrack lateral from well F -34B with the Nabors CDR2
Coiled Tubing Drilling rig on or around December 19`x', 2018.
Proposed plan for F -34C: The sidetrack F -34C will be a —3070' horizontal CST that will kick -out from the F -34B Ivishak
Producer. The CST will be drilled to the east and will access an undeveloped fault block. The sidetrack will be drilled on or
around December 19', 2018. The rig will move in, test BOPE and kill the well. The 3.80" window will be milled off a 4-1/2"
monobore whipstock set pre -rig. The well kicks -off in the Sag River, build through the Shublik and invert back into the Sag,
where the well will be drilled in zone for the remaining duration. The proposed sidetrack will be completed with a 3-1/4" x
2-7/8" L-80 solid liner, cemented in place and selectively perforated.*
RigWork (scheduled to begin December 191", 2018)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2323 psi).
2.
Mill 3.80" Window+ 10' of rathole.
3.
Drill production build section: 4.25" OH, —160'(35 deg DLS planned).
4.
Drill production lateral: 4.25" OH, "2910' (12 deg DLS planned).
5.
Run 3-1/4" x 2-7/8" L-80 liner to TD.
6.
Pump primary cement job: 38.4 bbis, (185 sacks, 1.17 ft3/sack) 15.3 ppg Class G, TOC at
TOL (9610 MD).*
7.
Perforate ^1500' based on drilling logs.
8.
Freeze protect well to a min 2,200' TVDss.
9.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. V: Tree work as necessary
2. S: Set UP if necessary. Set live valves. SBHP (pre POP for regional PPFG understanding)
3. F. Pressure test LTP if set)
4. T: Flowback
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (640 psi over -balance).
Disposal:
• All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >S% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >11 must go to GNI.
Hole Size:
• 4.25" for entirety of the production hole section.
Liner Program:
• 2-7/8", 6.5#, L-80 solid liner: 11,600' MD —13,280' MD
• 3-1/4", 6.6#, L-80 solid liner: 11,600' MD -9,610' MD
• A planned 38.4 bbis of 15.3 ppg cement will be used for liner cementing (TOC = TOL at —9610' MD).
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (640 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 100% inclination at kickoff point is 53'
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property line — 4,500'
• Distance to nearest well within pool — 150' (F -35A)
Logging:
MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
Perforating:
• Perforating: —1500' of perforations, 2" / 2.5" Millenium, 60 deg random phasing, 6 spf, perf guns.
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (640 psi over -balance).
• A X -over shall be made up to a safetyjoint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards: ✓
• F -pad is considered an H2S pad. Most recent H25 Level on Parent (F -34B) is 10 ppm. Max recorded on the pad: 160
ppm on F-24 (5/15/2007).
• Three fault crossings planned
o Fault #1: 15-45' DTS throw expected
o Fault #2: 10-40' DTN throw expected
o Fault #3: 5-25' DTE throw expected
• Lost circulation risk on F -34C is considered Low.
Reservoir Pressure:
• The reservoir pressure of F -34C is expected to be 3203 psi at 8800' TVD55 (7.0 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2323 psi.
• A min EMW of 8.4 ppg for this well will provide 640 psi over -balance to the reservoir.
Josi Hartley CC: Well File
CTD Engineer Joseph Lastufka
564-4570
by
North America - ALASKA - BP
PBU
F-34
PLAN F -34C
IJFam MILOWd7;1IYA
BP Coil Tubing Report
28 November, 2018
Company:
North America - ALASKA - BP
Project:
PBU
Site:
F
Well:
F-34
Wellbore:
PLAN F -34C
Design:
F -34C WP02
BP
BP Coil Tubing Report
Local Coordinate Reference:
Well F-34
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 64.38usft (F -34B) '
North Reference:
True
Survey Calculation Method:
Minimum Curvature -
Database:
EDM R5K - Alaska PROD - ANCP7
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Use AK [4267`15864) Using Well Reference Point
Map Zone: NAD27 •OGP-Usa AK / Alaska zone 4 126734`1586• Using geodetic scale factor
Site
F, TR -11-13
•*
Site Position:
Northing:
5,972,527.290 usft
Latitude:
70° 19' 55.283 N
From:
Map
Easting:
650,960.700 usft
Longitude:
148° 46'31.468 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.15 `
Well
F-34, F-34
Well Position
+N/ -S 0.00 usft
Northing:
5,974,667.000 usft
Latitude:
70` 20' 16.126 N
-El-W 0.00 usft
Easting:
651,959.000 usft •
Longitude;
148° 46' 1.057 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
35.67 usft
Ground Level:
35.99 usft
Wellbore
PLAN F -34C
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(nT)
BGGM2018 1/1/2019
17.05
80.95
57,442
Design
F -34C WP02
Audit Notes:
Version:
Phase:
PLAN
Tie On Depth: 10,19874
Vertical Section:
Depth From (TVD)
+NI -S
-El-W
Direction
(usft)
(usft)
(usft)
(I
-35 67
000
0 00
36.35
1128/2018 8:48:49AM
Page'
COMPASS 5000.1 Build 81D
50
Company: North America -ALASKA - BP
Well F-34
TVD Reference:
Project PBU
MD Reference:
KB Q 64.38usft (F -34B)
North Reference:
Site: F
Survey Calculation Method:
Minimum Curvature
Database:
Well: F-34
EIW
Northing
(usft)
Wellbore: PLAN F -34C
(usft)
3,725.00
Design: F -34C
WP02
3,725.96
1,932.49
Survey Tool Program
Date 11/28/2018
1,933.93
5,978,438.763
From
To
5,978,453.765
3,749.26
(usft)
(usft) Survey (Wellbore)
3,783.46
98.74
7,473.74 F-34 Srvy 2 GYD-CT-CMS
(F-34)
7,498.74
10,198.74 F -34B Srvy 2 GYD-CT-CMS
(F -34B)
10,198.74
13,280.00 F -34C WP02 (PLAN F -34C)
3,852.03
Planned Survey
5,978,557.226
3.880.83
1,936m
MD
Inc Azi
1,932.66
TVDSS
(usft)
(°) (°)
5,978,710.098
(usft)
10,198.74
50.66
11.59
8,709.26
F -34B Actual Survey - TIP
-10.00
653,811.879
10,200.00
50.77
11.40
8,710.06
10,210.00 •
51.64
9.90
8,716.32
KOP
653,771.303
12.00
10,229.14
53.14
8.82
8,728.00
TSHU
10,230.00
53.20
8.78
8,728.52
3
10,270.00
65.58
1.14
8,748.87
4
10,300.00
75.93
359.27
8,756.74
10,339.46
89.57
357.04
8,763.71
Invert
10,340.72
90.00
356.97
8,763.71
6
10,369.73
100.00
355.19
8,761.19
End 35deg1100ft
10,400.00
100.00
351.50
8,755.93
10,500.00
100.00
339.31
8,738.57
10,534.73
100.00
335.08
8,732.54
7
BP
BP Coil Tubing Report
Local Coordinate Reference:
Well F-34
TVD Reference:
Mean Sea Level
MD Reference:
KB Q 64.38usft (F -34B)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANC P1
Tool Name
Description
DLeg
GYD-CT-CMS
Gyrodata contcasin9
m/s
GYD-CT-CMS
Gyrodata cont.casing
m/s
MWD
MWD -Standard
NIS
EIW
Northing
(usft)
(usft)
(usft)
3,725.00
1,932.30
5,978,430.117
3,725.96
1,932.49
5,978,431.076
3,733.62
1,933.93
5,978,438.763
3,748.57
1,936.40
5,978,453.765
3,749.26
1,936.50
5,978,454.450
3,783.46
1,939.32
5,978,488.703
3,811.75
1, 939.41
5, 978, 516.9 81
3,850.78
1,938.15
5,978,555.976
3,852.03
1,938.08
5,978,557.226
3.880.83
1,936m
5,978,585.979
3,910.43
1,932.66
5,978,615.503
4,005.56
1,907.89
5,978,710.098
4,037.08
1,894.64
5,978,741.345
Easting
DLeg
V. Sec
TFace
(usft)
(°1100usft)
(usft)
(%
653,815.279
0.00
4,145.41
0.00
653,815.454
14.57
4,146.29
-53.86
653,816.738
14.57
4,153.31
-53.74
653,818.898
9.00
4,166.82
-30.00
653,818.990
9.00
4,167.43
-29.34
653,821.117
35.00
4,19665
-30.00
653,820.631
35.00
4,219.48
-10.00
653,818.574
35.00
4,250.17
-9.38
653,818.483
35.00
4,251.14
-9.10
653,815.931
35.00
4,273.16
-10.00
653,811.879
12.00
4,294.96
-89.08
653,785.193
12.00
4,356.89
-88.94
653,771.303
12.00
4,374.42
-89.63
1128/2018 8:48:49AM Page 3 COMPASS 5000.1 Build 81D
BP
BP Coil Tubing Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well F-34
Project.
PBU
TVD Reference:
Mean Sea Level
Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Well
F-34
North Reference
True
Wellbore:
PLAN F -34C
Survey Calculation Method:
Minimum Curvature
Design:
F -34C WP02
Database:
EDM RSK- Alaska PROD -ANCP1
Planned Survey
MD
Inc
Azi
TVDSS
NIS
E1W
Northing
Easbng
DLeg V.
Seo
TFace
(usft)
(°)
(°)
(usft)
(weft)
(usft)
(usft)
(usft)
(*iloousft) (usft)
(°)
10,600.00
100.00
343.03
8,721.20
4,097.06
1,871.68
5,978,800.844
653,747.136
1200.
4,409.11
89.31
10,699.73
100.00
355.19
6,703.88
4,193.33
1,853.16
5,978,896.711
653,726.675
12.00
4475.67
88.94
8
10,700.00
99.97
355.20
8,703.84
4,193.59
1,853.14
5,978,896.973
653,726.647
12.00
4,475.87
160.00
10,759.53
93.25
357.64
8,696.99
4,252.57
1,849.46
5,978,955.863
653,721.775
12.00
4,521.19
160.00
9
10,800.00
93.32
2.51
8,694.67
4,292.96
1,849.52
5,978,996.244
653,721.010
12.00
4,553.75
89.00
10,900.00
93.40
14.53
8,688.78
4,391.51
1,864.28
5,979,095.060
653,733.768
12.00
4,641.86
89.28
10,919.53
93.40
16.88
8,687.62
4,410.28
1,869.55
5,979,113.928
653,738.662
12.00
4,660.10
89.99
10
11,000.00
93.52
7.20
8,682.76
4,488.74
1,886.29
5,979,192.708
653,753.802
12.00
4,733.21
-89.00
11,100.00
93.53
355.18
8,676.59
4,568.34
1,888.36
5,979,292.328
653,753.854
12.00
4,814.66
-89.58
11,109.66
93.52
354.02
8,676.00
4,597.94
1,887.45
5,979,301.903
653,752.753
12.00
4,821.85
-90.33
TSGR
11,119.53
93.51
352.83
8,675.39
4,607.73
1,886.32
5,979,311.666
653,751.426
12.00
4,829.07
-90.40
11
11,200.00
93.96
2.50
8,670.14
4,687.86
1,883.05
5,979,391.714
653,746.534
12.00
4,891.67
87.00
11,239.53
94.15
7.25
8,667.34
4,727.14
1,886.40
5,979,431.047
653,749.087
12.00
4,925.26
87.63
12
11,300.00
90.07
13.26
8,665.11
4,786.56
1,897.16
5,979,490.672
653,758.636
12.00
4,979.52
124.00
11,379.53
64.72
21.17
8,668.73
4,862.37
1,920.84
5,979,566.929
653,780.572
12.00
5,054.48
12422
13
11,400.00
84.90
23.63
8,670.58
4,881.21
1,928.41
5,979,585.927
653,787.957
12.00
5,074.27
86.00
11,500.00
85.89
35.63
8,678.64
4,967.69
1,977.61
5,979,673.375
653,835.391
12.00
5,173.08
85.78
11,579.53
86.80
45.15
8,683.73
5,028.06
2,028.98
5,979,734.774
653,885.528
12.00
5,252.15
84.81
14
11,600.00
86.98
47.61
8,684.84
5,042.16
2,043.78
5,979,749.170
653,900.034
12.00
5,272.28
86.00
11,700.00
87.90
59.58
8,689.32
5,101.34
2,124.03
5,979,809.959
653,979.070
12.00
5,367.52
85.87
11/28/2018 8:48.49AM Page 4 COMPASS 5000.1 Build 81D
by
BP
BP Coil Tubing Report
Company: North America- ALASKA - BP
Local Co-ordinate Reference:
Well F-34
Project: PBU
TVD Reference:
Mean Sea Level
Site: F
MD Reference:
KB @ 64.38usft (F -34B)
Well: F-34
North Reference:
True
Wellbore: PLAN F -34C
Survey Calculation
Method.
Minimum Curvature
Design: F -34C WP02
Database:
EDM RSK- Alaska PROD
-ANCP1
Planned Survey
MD Inc
Azi
TVDSS
i
ENV
Northing
Easting
DI -eq
V. Sec
TFace
(usft) VI
(°)
(use)
(usft)
(usft)
(usft)
(usft)
1°7100usft)
(use)
1°I
11,779.53
88.70
69.10
8,691.58
5,135.73
2,195.61
5,979,845.783
654,049.926
1200.
5,437.63
85.33
16
11,800.00
88.73
71.55
8,692.14
5,142.62
2,214.88
5,979,853.061
654,069.049
12.00
5,454.60
89.50
11,900.00
86.87
83.56
8,694.25
5,164.12
2,312.33
5,979,876.537
654,166.037
12.00
5,529.69
89.44
12,000.00
89.06
95.56
8,696.06
5,164.90
2,412.12
5,979,879.333
654,265.791
12.00
5,589.47
89.19
12,100.00
89.30
107.55
8,697.50
5,144.90
2,509.91
5,979,861.327
654,363.953
12.00
5,631.34
88.97
12,159.53
89.45
114.70
8,698.15
5,123.46
2,565.40
5,979,841.017
654,419.661
12.00
5,646.96
88.80
16
12,200.00
89.45
109.84
8,698.54
5,108.13
2,602.84
5,979,826.449
654,457,800
12.00
5,656.81
-90.00
12,300.00
89.47
97.84
8,699.48
5,084.26
2,699.75
5,979,804.543
654,554.972
12.00
5,695.03
-89.95
12,400.00
89.52
85.84
8,700.37
5,081.05
2,799.51
5,979,803.361
654,854.771
12.00
5,751.5984
12,439.53
89.54
81.10
8,700.69
5,085.55
2,838.77
5,979,808.651
654,693.930
12.00
5,778.48
-89.73
17
12,500.00
89.55
88.35
8,701.17
5,091.10
2,890,95
5,979,815.426
654,753.972
12.00
5,818.63
90.00
12,600.00
89.57
100.35
8,701.95
5,083.53
2,998.47
5,979,809.869
654,853.824
12.00
5,871.52
89.94
12,700.00
89.61
112.35
8,702.67
5,055.43
3,094.25
5,979,783.715
654,949.944
12.00
5,905.66
89.85
12,719.53
89.62
114.70
8,702.80
5,047.63
3,112.15
5,979,776.285
654,968.002
12.00
5,910.00
89.76
18
12,800.00
89.62
105.04
8,703.34
5,020.31
3,187.74
5,979,750.509
655,044.123
12.00
5,932.61
-90.00
12,900.00
89.65
93.04
8,703.98
5,004.63
3,286.32
5,979,736.828
655,142.989
12.00
5,978.61
-89.94
12,999.53
89.68
81.10
8,704.56
5,009.71
3,385.54
5,979,743.919
855,242.076
12.00
6,041.52
-89.86
19
13,000.00
89.68
81.15
8,704.57
5,009.79
3,386.00
5,979,744.001
655,242.539
12.00
6,041.86
90.00
13,100.00
89.69
93.15
8,705.12
5,014.74
3,485.69
5,979,750.978
655,342.104
12.00
6,104.95
90.00
13,200.00
89.71
105.15
8,705.64
4,998.87
3,584.24
5,979,737.102
655,440.943
12.00
6,150.57
89.93
13,280.00
89.74
114.75
8,706.03
4,971.60
3,659.35
5,979,711.364
655,516.583
12.00
6,173.14
89.87
TD at 13280.00
1112812018 8:48'49AM
Page 5
COMPASS
5000.1 Build 81D
C
O
CL
9
EE
m c Q
m a W m
m v
ai m
c0a w33o" a
a
a
m � o
r
E m m
E
O W O N m tl m m m N O O m O n' T m
m 7 O N W Y W W W Q A m Cl
N CJ m W m W p p1 W W W W O m N m m N m W i
W W W W W W m m m m m m W m m m t0 m
m-? — — — — — — — — — — — — — N (V N N Cf t7 lO
a + _
A
C
D
O
O
V ON m W Ol l7 m CI A W l7 O A m Cl W N Cl O
Ed O m
d Y] {7 W H! N O A W N O A A N m m Cl m A W
O W a
Z% M N Cl CI m m V Y Y Y Y V O W N N N W m O
N OJ N� n W y m W N W V N M m N W O m M
O N Y m m Of O W m r m m W W O O O O
� �_ m d; m m at a1 a1 m m m m m m Oj m d; OJ lO m at
P O O O N M W C 0 M M t C M M M m W. O
N L n O O O A A Ap q r m m m m m m m m m m m O
m O O O O OI {"1 01 N W W M n n n N CW'I W� Om
N- N N N . . V m A W � N m m r- O n W N
m.0 0 0 0 0 0 0 0 0 0 ` ''' f
rt
b
by
North America - ALASKA - BP
PBU
F
F-34
PLAN F -34C
F -34C WP02
Anticollision Summary Report
29 November, 2018
0 by
Company:
North America -ALASKA -BP
Project:
PBU
Reference Site:
F
Site Error:
0,00usft
Reference Well:
F-34
Well Error:
0.00usft
Reference Wellbore
PLAN F -34C
Reference Design:
F -34C WP02
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well F-34
KB @ 84.38usft (F -34B)
KB @ 64.38usft (F -34B)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
F -34C WP02
Fitter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
10,198.74 to 13,280.00usft Sun Method:
Trev. Cylinder North
Results Limited by:
Maximum center -center distance of 1,525.13usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 11/29/2018
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
98.74
7,473.74 F-34 Srvy 2 GYD-CT-CMS (F-34)
GYD-CT-CMS
Gyrodata contusing m/s
7,498,74
10,198.74 F -34B Srvy 2 GYD-CT-CMS (F -34B)
GYD-CT-CMS
Gyrodata contusing Ms
10,198.74
13,280.00 F -34C WP02 (PLAN F -34C)
MWD
MWD - Standard
1112912018 2,15:45PM Page 2 of 4 COMPASS 5000.1 Build BID
BP
bp Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well F-34
Project:
PBU
ND Reference:
KB Q 64.38usft (F -34B)
Reference Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Site Error:
0 00usft
North Reference:
True
Reference Well:
F-34
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
F -34C WP02
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
F
F-05 - F -05A - F -05A
10,248.74
11,964.00
1,16095
187.06
989.03
Pass - Major Risk
F-06 - F-06 - F-06
Out of range
F-06 - F -06A- F -06A
Out of range
F-12 - F -12A- F -1 2A
Out of range
F-14 - F-14 - F-14
10,660.78
10,300.00
1,064.72
620.59
459.39
Pass - Major Risk
F-18 - F-18 - F-18
13,278.30
10,775.00
798.73
131.97
703.16
Pass - Major Risk
F-18 - F-1 8A - F-1 8A
10,327.65
10,700.00
173.17
151 46
36.74
Pass - Major Risk
F-19 - F-19 - F-19
11,723.74
11,250.00
871.22
18666
701.72
Pass - Major Risk
F-19 - F-1 9B - F -19B
Out of range
F-21 - F-21 - F-21
Out of range
F-21 - F-21PB1 - F-21PB1
Out of range
F-30 - F-30 - F-30
Out of range
F-30 - F -30A - F -30A
Out of range
F-32 - F-32 - F-32
Out of range
F-33 - F -33A - F -33A
11,367.80
11,075.00
275.69
206.02
85.33
Pass - Major Risk
F-33- F-33APB1 - F-33APB11
11,326.91
11,075.00
240.70
207.67
54.54
Pass- Major Risk
F-34 - F-34 - F-34
10,205.86
10,400.00
569.73
48.09
522.69
Pass - Major Risk
F-34 - F -34A - F -34A
10,823.74
10,525.00
739.89
96.62
649.94
Pass - Major Risk
F-34 - F-34APBI - F-34APB1
10,823.74
10,525.00
739.89
96.69
649.88
Pass - Major Risk
F-34 - F -34B - F -34B
10,506.34
10,600.00
192.05
8.21
192.05
Paw -NOERRORS�
F-35 - F -35A- F -35A
13,241.96
13,725.00
289.53
227.99
79.34
Pass -Major Risk
F-36 - F-36 - F-36
Out of range
F-36 - F-36LI - F -36L7
Out of range
F-36 - F -36L2 - F-3612
Out of range
F-36 - F-3613 - F-3613
Out of range
F-37 - F-37 - F-37
Out of range
F-37 - F -37A - F -37A
Out of range
F-37 - F-37ALl - F-37AL1
Out of range
F-37 - F-37APB1 - F-37APBI
Out of range
F-37 - F-37APB2 - F-37APB2
Out of range
F-39 - F-39 - F-39
Out of range
F-39 - F-3911 - F -39L1
Out of range
F-39 - F -39L1-01 XX - F-39LI-01
Out of range
F-41 - F41 - F41
Out of range
F41 - F41A- F41A
Out of range
F41 - F41PB1 - F41PB1
Out of range
F42 - F42 - F42
Out of range
F42-F42A-F42A
Out of range
F48 - F48 - F48
Out of range
F48 - PLAN F48Lt - F-481-1 WP04
Out of range
F48 - PLAN F48LI-01 - F481-1-01 WP04
Out of range
1112912018 2: 15 45P Page 3 of 4 COMPASS 5000.1 Build 81D
0 by
Company:
Project:
Reference Site:
Site Error:
Reference Well:
Well Error:
Reference Wellbore
Reference Design:
North America - ALASKA - BP
PBU
F
0.00usR
F-34
0.00usft
PLAN F -34C
F -34C WP02
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well F-34
KB @ 64.38usff (F -34B)
KB @ 64.38usR (F-3413)
True
Minimum Curvature
1 00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to KB @ 64.38usff (F -34B) Coordinates are relative to: F-34
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0'0,000 W ° Grid Convergenceat Surfaceis: 1.16°
1600-
,1200-
0
600-
1200-
0
O
m
Um 800-
C
C
d
U
0
w
cc 400-
0
-4- F-09,
$ F-09,
$ F-09,
� F ,
-X- F-10,i0-1OA,F-10AV1
-A- F -10,F -10,F -10V5
Ladder Plot
$ F-10,F-10B,F-10BV2
$ F-10,F-10C,F-10CV0
-� F-05, F-0SA, F -05A V6
�F F -05,F -05B, F -05B VO
-� F-05, F-05, F-05 V6
-t- F-08, F -08B, F -08B VO
$ F-08, F-08, F-08 V1
$ F-08, F-0BA, F-0SA V5
-♦ F -11,F -11,F-11 V4
�F F-11,F-11A,F-11AV3
T r-."r-oc.ry<v r 1 r T rvi, v rx,r v..., ..-w r
��33, F -33A, F-33dWo 1000 F-39, F -3d,/1 15000
$ F-3� W%0usffn) -Ar F39,F-39,F-39L1VO
�F F-34, F-34, F-34 V12
-t- F-34,F-34A,F-34AV16
-_- F34, F34APB1,F-34APB1 V16
$ F35, F-35, F-35 V1
$ F-35, F35A, F -35A VO
F36, F-36, F-36 V 1
fir(- F-36, F-361-2, F-361.2 VO
-� F-36,F-36L3,F-360VO
-� F-36,F-36L1,F-36L1 VO
$ F42, F42A, F-42AV4
$ F-23,F-23BVO
$ F-23, F-23, F-23 V1
� F-23,F-23AV2
-f F-31,F
-1� F-31,F-31APB1, F-31APB1 VO
� F-31, F-31, F-31 V1
$ F-30, F-30, F-30 V1
$ F-30, F30A, F30A VO
� F -14,F -14,F -14V1
� F-13, F -13C, F -13C VO
11/292018 Z 15.45PM Page 4 of 4 COMPASS 5000.1 Build 810
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
__ _
I
ILF-37,
III_
_JIIII:LEG
-09,F-09- _f-29-,F-29BPBIF=
-096,F-098V10F-29,
F-296, F-296
F -29A
ND
BPB4 VW _ _ _ _ALNPo]VOI
0
4
0-09C,F-09CV0F-29,F-29A,
7APB1
$ F-10,F-10B,F-10BV2
$ F-10,F-10C,F-10CV0
-� F-05, F-0SA, F -05A V6
�F F -05,F -05B, F -05B VO
-� F-05, F-05, F-05 V6
-t- F-08, F -08B, F -08B VO
$ F-08, F-08, F-08 V1
$ F-08, F-0BA, F-0SA V5
-♦ F -11,F -11,F-11 V4
�F F-11,F-11A,F-11AV3
T r-."r-oc.ry<v r 1 r T rvi, v rx,r v..., ..-w r
��33, F -33A, F-33dWo 1000 F-39, F -3d,/1 15000
$ F-3� W%0usffn) -Ar F39,F-39,F-39L1VO
�F F-34, F-34, F-34 V12
-t- F-34,F-34A,F-34AV16
-_- F34, F34APB1,F-34APB1 V16
$ F35, F-35, F-35 V1
$ F-35, F35A, F -35A VO
F36, F-36, F-36 V 1
fir(- F-36, F-361-2, F-361.2 VO
-� F-36,F-36L3,F-360VO
-� F-36,F-36L1,F-36L1 VO
$ F42, F42A, F-42AV4
$ F-23,F-23BVO
$ F-23, F-23, F-23 V1
� F-23,F-23AV2
-f F-31,F
-1� F-31,F-31APB1, F-31APB1 VO
� F-31, F-31, F-31 V1
$ F-30, F-30, F-30 V1
$ F-30, F30A, F30A VO
� F -14,F -14,F -14V1
� F-13, F -13C, F -13C VO
11/292018 Z 15.45PM Page 4 of 4 COMPASS 5000.1 Build 810
Em
Pmjwt: PBV mix =P -1
F -34C RE%e✓Er lxlauuTrcx
SM: IF uy,.mrw1OoaaretelNElRelmm�: well Fadine revm
Well: F-30 a.yenwuwvenin Mol R00m'm. n5nn 5®Lwd
WaOtwfx PLAN F.34C a A lea �ml R+ 90 ro WNa ME)
PI
FJ/CWPO2 �J rl.aameml]4 ne 5a.3misnlia�
C9lwean Lefwe: N.imemcu0en
N.£LL DETAILS: F-34
GMWd Le901: 35.88
.W-8 .EFW Num EaWM Le016Ne
nm nn. 59]4667900 851959400 70'20'16.12614
SECIIONDETAILS
Sae
MD
Inc
An
mlW
.WS
+&W
Dleg
TFaee VSect TXW
1
10198.74
50.66
11.59
870926
3725.00
1932.30
0.00
OW 4145.41
2
1021060
51.64
990
871632
3733.62
1933.93
14.57
-53.85 4153.31
3
10230.00
5320
8.70
8728.52
3749.26
193650
9.00
-30.00 4167.47
4
10270.00
6558
1.14
8748.87
3183.46
193932
35.00
-30.00 4196.65
5
10340.72
90.00
356.97
8763.71
3852.03
1938.08
3560
.10.00 4251.14
6
10369.73
100.00
355.19
8761.19
3880.83
1936.11
35.00
-1000 427316
7
10534.73
100.00
335.08
8732.54
403708
1894.64
12.00
-90.00 4374.42
8
10699.73
10060
355.19
870368
4193.33
185316
12.00
90.00 447567
9
10759.53
9325
35764
86%99
4252.57
184946
12.00
160.00 4521.19
10
10019.53
93.40
16.88
8687.62
441028
186955
12.00
89.00 4660.10
11
1111953
93.51
352.83
867539
4607.73
1086.32
1200
59.00 4829.07
12
1123953
94.15
7.25
8667.34
4727.14
1886.40
12.00
87.00 492528
13
1137953
84.72
21.17
8688.73
4862.37
1920.64
12.00
124.00 5054.18
14
1157953
8660
45.15
8603.73
5028.06
2028.98
12.00
86.00 5252.15
15
11779.53
88.70
69.10
869168
5135.73
219561
12.00
86.00 5437.63
16
12159.53
89.45
114.70
8698.15
5123.46
2565.40
12.00
8950 5616.96
17
12439.53
8954
81.10
8700.69
5085.55
2838.77
12.00
90.00 5778A8
18
12719.53
8962
11170
870260
504763
311215
12.00
90.00 591900
19
1299953
8968
81.10
8704.56
5009.71
336554
12.00
.90.00 604152
20
13280.00
89.74
11475
8706.03
4971.60
365935
12.00
90.00 6173.14
aim
UK
910
F-3
1200 1400 1600 1800 j0ce 2200 2400 2600 2090 3000 3200 3400 3000 3800 4000 4200 4Cg 4600 4800
West( -)/East(+) (200 usft/in)
6240
6040
ANNOTATIONS
5840
TO
MD hwddlan
G
0709.26
10198]4 F-34BAcWaISur*y-TIP
a56a
871632
10210.00 I(OP
872852
10230.00 J
pO54IX
874867
10270.00 4
0763.71
10340.72 5
N
8761.19
10369.73 End 356WOOR
X20
873254
10534.73 7
+
870368
10699.73 8
8696.99
10759.53 9
X500
p
8687.62
1D919.53 10
8675.39
11119.53 11
480
866734
11239.53 12
8668.73
11379.53 13
�a6o
86877311579.53
14
0
8691.68
11779.53 15
8698.15
12159.53 16
8700.69
1243953 17
070280
12719.53 10
420
870456
12999.53 19
870603
13280.00 TDK1328000
400
380
360
F-3
1200 1400 1600 1800 j0ce 2200 2400 2600 2090 3000 3200 3400 3000 3800 4000 4200 4Cg 4600 4800
West( -)/East(+) (200 usft/in)
7PA-....I
i..-
- 4f2___4
F-
4C T1 -3dCT
'-3dCT
R21
mHU
Mvn
)dRAc ISuv
=nP
F- TE
a
3 T
9 In 11 13 13
.11 A
F-3
1200 1400 1600 1800 j0ce 2200 2400 2600 2090 3000 3200 3400 3000 3800 4000 4200 4Cg 4600 4800
West( -)/East(+) (200 usft/in)
9200
Near 34W 35M 3b30 37M 39W 3. 40.14 4107 43074310 4400 4507 WO. 4100 d8C0 dW] 5400 51W 52M 5300 X00 SSW
Vertical Section at 36.35° (100 usNin)
- 4f2___4
F-
4C T1 -3dCT
'-3dCT
R21
mHU
Mvn
)dRAc ISuv
=nP
F- TE
a
3 T
9 In 11 13 13
.11 A
Id IS
16
1
IB
19
aI1R
M
51
11
F 33Ma/1 m
I I MM31
F'XI
9200
Near 34W 35M 3b30 37M 39W 3. 40.14 4107 43074310 4400 4507 WO. 4100 d8C0 dW] 5400 51W 52M 5300 X00 SSW
Vertical Section at 36.35° (100 usNin)
Project:
PBU
by Site:
F
Well:
F-34
Wellbore:
PLAN F-33
Plan:
F -34C WP
Possible Magnetic Interference:
From KOP to 10,380' MD
wer+y+F>•0
Depth Range: 10198.74 To 13280.00
Azimuth from North [y vs Centre to Centre Separation (10 uslMn)
From
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America -ALASKA - BP
10380
Interpolation Method: MD, interval: 25.00
Calculation Method: Minimum Curvature
10580
Depth Range From: 10198.74 To 13280.00
Error System: ISCWSA
IC
Results Limited By: Centre Distance: 1525.13
Seen Method: Tray. Cylinder North
)2
Reference: Plan: F -34C WP02 (F-34/PLAN F34C)
Error Surface: Elliptical Conic
Warning Method: Rules Based
Depth Range: 10198.74 To 13280.00
Azimuth from North [y vs Centre to Centre Separation (10 uslMn)
From
Colour To MD
10199
10380
10380
10580
10580
13280
I LEGEND
Grmee UM ]cMl
rW4 NoMlnp Eam", u iMM rmmiNbo
o.W 0.00 ..l. uwY.NO 1Pm-MANN Iw M•1Lnw
Sec MD Inc mi WD 4WS +V -W Dies TFace Wed
1 10198.74 50.88 11.58 077384 3725.00 1932.30 000 0.00 4145.41
2 10210.00 5164 9.80 878070 3733.62 1833.93 14.57 -53.08 4153.31
3 10230 00 53.20 8.76 8792.90 374810 1938.50 8.00 -3000 4167.43
4 10270.00 65.58 1.14 8013.25 3783.48 1939.32 3500 -30.00 4190.85
5 10340.72 9000 358s7 8828.09 3852.03 1938.08 35.00 -10.00 4251.14
8 1036973 100.00 35519 88259 3880.83 1998.11 35.00 -10,00 4273.16
7 10534.73 100.00 335.08 0790.92 4037.08 1894.84 12.00 -90.00 4374.42
8 10099,73 10000 355.19 0768.28 419393 1853.16 12.00 8000 4475.87
9 10759.53 9325 357,64 6701.37 4252.57 1848.48 12,00 180 00 4521.19
10 10919.53 93.40 less 875200 441038 1869.55 1200 Beep 4800.10
11 11119.53 93.51 352.03 8739P 4607.73 1886.32 12.13D -89.00 482907
12 11239.53 84.15 7.25 8731.72 4727.14 1886.40 12.00 87.00 4925.28
13 11379.53 8412 21.17 8733.11 4862,37 1920.64 12.00 12440 504,48
14 11579.53 IS 80 45.15 0748.11 5020.06 2028.98 12.00 80,00 5252.15
15 11779.53 8870 69.to 8766.05 513513 2195.61 12.00 88.00 5,13703
10 12159.53 89.45 114.70 8762.53 5123.48 2565.40 12.00 09.50 546.98
17 12439.53 8854 81.10 8765.07 5085.55 2836.77 12.00 -90.00 5778,48
18 1271953 89.62 11470 8767.10 5047.63 3112.15 1200 90.00 5910.00
19 12988.53 09.08 81.10 8760.94 5009.71 3385.54 12.00 -90.0D 8041.52
20 13280.00 89.74 11075 8770.41 4971.80 3859.35 12.00 90.00 6173.14
ik
5JRYETFNCGPAN
+F44, F-1411, F. 13 V22
pqq From Dego To 8uvgfln
Tool
W74 70574 1`4m$ry2GY0.CT4M51F34
GYGCT.CMS
74M 74 1018874 F4W8Sry2GY6CT-CM51F44MI
GYDCTL S
101074 1328000 F34C4W02(PLANI`W)
MNO
v Fb, FW4, F45i08
+F44, F-1411, F. 13 V22
rF-18,F-18•F-18 V12
a 144, F.14, F.% VI2
+FAIT. F -IM, F-169 V0
sF-U.F-14AF V16
a F.te F-1% F -19W
eF44 F-3MP[h F3 81 V16
r F45 F43N, FJ50W
+F-35, F.a F.SWVP
+F33. F-Mmo. F45111W
F-14 F-14, F -14W
Azimuth from North [ol vs Centre to Centre Separation [40 ustilin)
40
E b g t2 usmin)
KB ® 84.Musfl (F.NB)
m ' ��B�E DETAILS: PLAN F-34C FEF&BLffW�LOtUmTice�
Pmj a PBU
.NPT°i
,}.'
Blb: F
F39C CoadineblWE)Pdamrte WM Fb.Trv�N�M
WN: Fd
�fi]Mii�i� VwOm'(IW)RM&mm: I(B@6fa&MILa1B1
W wm PLAN F-
fy'JJI/l/�1'
°wm�in= IF MB s°°°"f/sl Pel®nm: Lm-Io.BOn,000D
%m: F-24CWP02MsO MIMD
sem. Te on MD: 10198.74 Nmwma oEnm Berererce. sB@U.BB�m(FMB)
Ce�aismn namm: Nrrtvn Gmaue
E b g t2 usmin)
KB ® 84.Musfl (F.NB)
by
North America - ALASKA - BP
PBU
F-34
PLAN F -34C
F -34C WP02 Plus 500ft MD
AOGCC Offset Well Report
27 November, 2018
by
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
F
Site Error:
0.00usft
Reference Well:
F-34
Well Error:
0 oousft
Reference Wellbore
PLAN F -34C
Reference Design:
F -34C WP02 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well F-34
Mean Sea Level
KB @ 64.38usft (F -34B)
True
Minimum Curvature
1 00 sigma
EDM R5K-Alaska PROD -ANCPt
Offset Datum
Reference
F -34C WP02 Plus 50011 MD
GYD-CT-CMS
Filter type:
NO GLOBAL FILTER'. Using user defined selection & filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
EIIiptcal Conic
Survey Tool Program Date 11/27/2018
From To
(usft) (usft) Sumey (weighers)
98.74 7,473.74 F-34 Srvy 2 GYD-CT-CMS (F-34)
7,498.74 10,198.74 F -34B Srvy 2 GYD-CT-CMS (F -34B)
10,198.74 13,78000 F -34C WP02 Plus 50011 MD (PLAN F -34C
Tool Name
Description
GYD-CT-CMS
Gyrodata contcasing mls
GYD-CT-CMS
Gyrodate cont.casing Ms
MWD
MWD -Standard
11272018 3:46.33PM Page 2 of 109 COMPASS 50001 Build 810
BP
bp Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well F-34
Project:
PBU
ND Reference:
Mean Sea Level
Reference Site:
F
MD Reference:
KB @ 64.38usft (F -34B)
Site Error:
0.00usft
North Reference:
True
Reference Well:
F-34
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN F -34C
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
F -34C WP02 Plus 500ft MD
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
F
F-10 - F-10 - F-10
2,672.12
2,675.00
199.02
F-10 - F -10A - F -10A
2,672.12
2,675.00
199.02
F-10 - F -10B - F -10B
2,672.12
2,675.00
199.02
F-10 - F -10C - F -10C
2,672.12
2,675.00
199.02
F-10-F-10CP81-F-10CPB1
2,672.12
2,675.00
199.02
F-11 - F-11 - F-11
2,647.35
2,650.00
85.77
F-11 - F -11A- F -11A
2,647.35
2,650.00
85.77
F-11 - F-11 B- F-11 B
2,647.35
2,650.00
85.77
F-12 - F-12 - F-12
2,923.90
2,925.00
25.83
F-12 - F -12A- F -12A
28.71
28.34
35.02
F -13 -F -13-F-13
3,504.99
3,475.00
114.89
F-13- F -13A- F -13A
3,504.99
3,475.00
114.89
F -13 -F -138 -F -13B
3,488.46
3,475.00
114.58
F-13- F-13BPB1 - F-13BPB1
3,488.46
3,475.00
114.58
F-13 - F-1 3C - F -13C
3,488.46
3,475.00
114.58
F-14 - F-14 - F-14
4,088.90
4,000.00
166.05
F-18 - F-1 BA- F-1 BA
10,327.66
10,700.00
173.17
F-30 - F-30 - F-30
1,117.55
1,125.00
132.35
F-30 - F -30A - F -30A
1,117.55
1,125.00
132.35
F-32 - F-32 - F-32
2,747.33
2,750.00
100.97
F-34 - F-34 - F-34
7,796.74
7,800.00
32.26
F-34 - F -34A - F -34A
8,750.19
8,775.00
39.35
F-34 - F-34APB1 - F-34APBI
8,750.19
8,775.00
39.35
F-34 - F -34B - F -34B
10,506.35
10,600.00
192.05
F-34 - PLAN F -34C - F-34 #1
28.71
28.71
0.00
F -34 -PLAN F -34C -F -34C WP02
13,280.00
13,280.00
0.00
F-37 - F-37 - F-37
3,003.12
3,000.00
54.54
F-37 - F -37A - F -37A
2,987.78
3,000.00
54.43
F-37 - F-37ALl - F-37AL1
2,987.78
3,000.00
54.43
F-37 - F-37APB1 - F-37APB1
2,987.78
3,000.00
54.43
F-37 - F-37APB2 - F-37APB2
2,987.78
3,000.00
54.43
F-39 - F-39 - F-39
1,449.32
1,450.00
178.17
F-39 - F-391-1 - F-391-1
1,449.32
1,450.00
178.17
F-39 - F-391-1-01XX - F-3911-01
28.71
28.37
179.86
F-41 - F-41 - F-41
2,674.10
2,675.00
85.41
F-41 - F -41A - F -41A
2,874.10
2,675.00
85.41
F-41 - F-41 PB1 - F-41 PB1
2,674.10
2,675.00
85.41
1127/2018 3.46.33PM Page 3 of 3 COMPASS 5000 1 Build 81D
TRff= 4-1116"CIW
WBLFE/AD=
13-518"CIW
ACTUATOR=
BAKER
OKB. EEV =
65.64'
BF. B -EV =
36.62'
KOP=
7500'
Max Angle =
65` @ 10652'
-
Datum MD=
10356
Datum TVD=
8800'SS
13-3/8' CSG, 68#, L-80, D= 12.415"
Minimum ID = 3.726" @ 8008'
4-112" HES XN NIPPLE
11 9-518" CSG, 47#, L-80 NSCC, D = 8.681' 1
FERFORATIONSLA WRY
REF LOG: AkNO DFF1/GR1R S ON 04125105
ANGLE AT TOP PERF: 65 @ 10635'
Note: Refer to Production DB for historical perf data
SIZE SFF M RVAL Opn/Sgz SHOT SOZ
2-718" 4 10635 - 107351 O 1061011051
F _34 SAFE TOTE: PARENT WELLBORE NOT SHOWN
ELOW WHIPSTOCK ."4-12" CHROME TBG 8
[LBNR***
2192' 41/2" HES X NP, D = 3.813'
GAS LFT MANDRELS
ST
MD
TVD
DEV TYPE
VLV
LATCH FORT
DATE
5
3248
3244
13 MMG
DOME
PoC 16
05/10/05
4
4975
4741
33 MMG
SO
RK 20
05/10/05
3
6035
5588
40 MMG
OM1'
RK 0
04/27105
2
7059
6391
37 MMM
DMY
RK 0
04127/05
1
7884
7043
40 KG82
DMY
RK 0
04127/05
733 —19-5/8' X 7- BKR C-2 ZXP LTP,
w / FMC LNR HGR, D = 6.30'
MLLOUT WINDOW (F348) 7483-75W]
14-1/2" FES X NP. D = 3.813' 1
7'X 4-1/2' BKR S3 PKK D = 3.875-
700]' 4-1/2' HES X NF, D = 3.813'
8008' 4-12" HES XN NP, D = 3.725'
8021'4-12" WLE{i. D = 3.958'
6493' 7" X 4-12" BKR ZXP LTP
w/FMC LNR HGP. ID=4.44'
4-112"TBG, 1 8021'
13CR \ \
13CR-80, VAM TOP, 1
.0152 bpf, D = 3.958'
7" LNR, 26#, L-80, BTC -M, 10142'
.0383 bpf, D= 6.276"
FBTD 10762'
12.6#, 13CR-80 VAMTOP, .0152 bpf, D=3.958" -
DATE REV BY 00Mu84TS
DATE REV BY COMMB4TS
1023/89 ORIGINAL COMPLEnON
08/15/17 LLGIJME SEF SLP STOP w BP GAUGE
07108496 SRB SIDETRACK(F-34A)0322/18
DG/JMJ PILLED SLP STOP&BP GAUGE
04130105 N2ES SIDETRACK(F-3413)
05110/05 DTR/PJC GLV CIO
06/01/05 JAFn-FL PEWORATTONS
05128/07 JAF/PJC DRLG DRAFT ACTIONS
D = 3.950'
P UDHOE BAY LUT
WELL F -34B
PERM! No: `2050530
AP No: 50-029-21980-02
SEC 2, T11 N, RI 3F- 2133' FNL & 2413' FWL
BP Exploration (Alaska)
TREE=
V113LFEAD=
13.5/8' C1W
ACMTOR=
ITYPEI
OKB. ELEV =
65.64'
BF. ELEV =
36.62'
KOP=
7500'
Max Angle =
—° @ —'
Datum MD
RK
Datum
05110/05
PROPOSPtL F -34C
13u�
ND= 880D'SS 5g# L�0
D- 12.415'
Minimum ID = 3.726" @ 8008'
4-1/2" HES XN NIPPLE
19-5/8' CSG. 470. L-80 NSOC. D = 8.681' 1
SAFE. .407E"`4-12- CHIROME TW**
a-uc r A rW nP =
GAC I FT MANf1RFI S
ST MD
I TVDI
DEV
ITYPEI
VLV JILATCHIPORTI
D = 3.958'
DATE
5 3248
3244
13
MMD
DOME
RK
16
05110/05
4 4975
4741
33
WAG
SO
RK
20
05110/05
3 6035
5588
40
MW
DMY
RK
0
04/27/05
2 7059
6391
37
MMG
CMY
RK
0
04127/05
1 7884
7043
40
KGB2
CW
RK
0
04/27/05
LT'9-518' X LBKR C-2 ZXP LTP,
w / MAC LNR HGR D = 6.30'
MLLOUT WNDOW (F -34B) 7483' - 7500'
3' H 4-1/2- HES X NP, D= 3.813'
17'X4-1/2' BKR^ S-3 PKK D=3.875' i
4-1/2* FPS X NP, D= 3.813'
4-V2' FFS XN NP, D= 3.725'
3, 12.6#, 8021'
REV BY
8021' —j4 -1/Y VYLl--1.�. D=3.958'
VAM TOP,
1023189
D = 3.958'
8493' 7' X 5' BKR ZXP LTP
SRB
SIDETRACK(F-34A)
w / HMC LNR HGR, D = 4.42'
04130105
J9610'
8517' S' X 4-12' XO,
_I I_
D = 3.950'
TOL 9610'
3.70- DEPLOY SLV, D= 3.00'
17' LW 26#, L-80 BTC -M, .0383 bpf, D = 6.276' I
4-1/2' LNR, 12.6#, 131
.0152 bpf, D = 3.958'
L6#, L-80 TCI 1..007!
PE iFORATION S11NWRY
REF LOG: ON _I /
ANGLEATTOPPERF. _-@ '
Note: Refer to Production DB for historical perf data
I Pffm�
bpf, ID = 2-441' 13280'
MLLOUT WIDOW (F -34C) 10210' -
11600' H3-1/4' X 2-7/8' XO. D=
DATE
REV BY
COWNTS
DATE I REV BY COMMENTS
1023189
ORIGINALCOMPLETION
07108196
SRB
SIDETRACK(F-34A)
04130105
WES
SIDETRACK (F -34B)
_I I_
CTD ST (F -34C)
11/19118
JMD
BUILT PROPOSED
PRUDHOE BAY LW
WELL: F -34C -
PERMR No:
AR No: 50-029-21980-03
SEC 2, T11 N, R13E, 213Y RC 8 2413' FWL
BP Exploration (Alaska)
Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17
Quick Test Sub to Otis
Top of 7" Otis 1 0.0 it
CDR2 Rig's Dnp Pan
Distances from top of riser
Excluding quick -test sub
F— 7-1116" 6k Flanes X 7" pis Boz
Top of Annular 6.0 ft
aril7r
Top o/Annular Element 6.7ft Annulalar
Bottom Annular
8.0 ft
CL Blind/Shears
9.3 ft
Q 2318" Pi e/Sli s
10.1 ft
�e1#IFn.krly{�.a� iki cMn:r
Alk di
III 3g v3-12"- Ill �
1,0
CL2-318"Pipe/Slips Millin
2-38"Pimislips -
CL of Top Swab 16.0 ft
f— Swab Test Pump Hose
TI f T2
CL of Flow Cross 17.4 ft
Master
CL of Master 18.8 ft
LDS O
IA
OA
LDS O
Ground Level
Remark:
AOGCC
Permit to Drill No. 218164
10 December 2018
INPUT OUTPUT
Geographic, NA027 State Plane, NAD27
5004 -Alaska 4, U.S. Feet
PBU F -34C 111
Latitude: 70 20 16.12600 NorthinglY: 5974666.986
Longitude: 148 46 01.05700 EastinglX: 651959.009
Convergence: 1 09 40.19392
Scale Factor: 0.999926231
Corpscon v6.0.1, U.S. Army Corps of Engineers
TRANSMITTAL LETTER CHECKLIST
WELL NAME: Ag /" _' v"�
PTD: 2 -19 --ICV
ZDevelopment _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: POOL: �/t c%( C/ /
Check Boa for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. API No. 50- _
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
_� from records, data and logs acquired for well
name on permit .
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Comfy Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(dx2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, PRUDHOE OIL -640150
PTD#:2181640 Company BP EXPLORATION (ALASKA). INC. _ Initial Class/Type
_Well Name: PRUDHOE BAY UNIT F -34C _Program DEV Well bore seg ❑
_DEV / PEND _GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven. gas conforms to AS31.05A30lj.1..A),(j.2.A-D) _ _ _ _ _ _ _
NA
_ _ _ ... . .
1
Permit fee attached.. .. ...... _ _ _
NA
2
lease number appropriate_ _ _ _ _ _ _ _ _ _
Yes
Surface Location lies within ADL0028280; Top Prod Int & TO lie within ADL0028277......
II3
Unique well. name and number - - - - _ _ _ _
Yes
14
Well located in.a defined pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F
5
Well located proper distance. from drilling unit. boundary _ ...
Yes
CO 341 F, Rule 2:. There shall be no restrictions. as to well spacing_ except that. no pay shall be
6
Well located proper distance. from other wells _ _ _ _ _ _ _
Yes
opened in a well closer than 500 feet to.the boundary of the affected area, .Plannedwell conforms to _
7
Sufficient acreage available indrilling unit. .. .... _ _
Yes
CO 341 F, Rule 2._
8
If. deviated, is wellbore plat included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
9
Operator only affected party..... _ _ _ _ _
Yes
10
Operator has. appropriate bond in force . _ _ _ _ _ _ _ _
Yes
Appr Date
11
Permit can be issued without conservation order_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
12
Permit can be issued without administrative.approval ........ .. _ _
Yes
SFD 12110/2018
13
Can permit be approved before 15 -day wait. _ _ _ _ . ... ..
Yes
14
Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For.
NA.
................. . .
15
All wells within 1/4 mile.area of review identified (For service wep only). _ _ _ _ _ _ _ _ _
NA.........
16
Pre -produced injector duration of pre -production less than 3 months (For service well. only) ..NA.
..... ...........
18
Conductor string_ provided ...... . ................... . . . . . . . . . . . . . . .
NA_ _
_ _ This is a CTD sidetrack from an existing production liner.....
Engineering
19
Surface casing protects all.known USDWs .. ..
NA.
This is a CTD sidetrack from an existing production liner....
20
CMT vol adequate to circulate on conductor & surf csg
NA.
This is a CTD sidetrack from an existing production. liner............................. .
21
CMT vol adequate to tie-in long string to surf csg. . . . . . . . ............. .. . .
NA..
_ This is a CTD sidetrack from an existing production liner_
22
CMT will cover all known productive horizons . ...... . .......... . .. . . . . . .
Yes
_ _ Fully cemented production liner
23
Casing designs adequate for C, T, B & permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
Fully cemented production liner .
24
Adequate tankage. or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
CDR 2 has been utilized extensively. across the north slope
25
Jfa re -drill, has,a 10-403 for abandonment been approved . . . . . . . . .... ......
NA
_ Alternate_ plug_ placement per 20 AAC 25.112(i)
126
Adequate wellbore separation proposed _ _ _ _ _ _
Yes
_ No BP collision risk failures _ _ _ _
!27
If.diverter required, does it meet regulations, _ . _ _ . _ _ . _ . .... _ _ _ .
NA. _
.. _ This is a CTD sidetrack from an existing production liner
Appr Date
28
Drilling fluid. program schematic & equip list adequate. _ _ _ _ _ _ _ _
Yes
All drilling in zone with mud weight greater than reservoir gradient
MGR 12/14/2018
29
BOPEs, do they meet regulation _ _ _
Yes _
_ _ _ . _
30
BOPE.press rating appropriate: test to (put psig in comments) . .. . ...............
No........
3500 psi..
31
Choke manifold complies w/API RP -53 (May 84)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes _
_ _ _ _ _ _ _ . _ _ _ . _ _ ............... _ .....................
32
Work will occur without operation shutdown _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..
Yes .
.................................
33
Is presence of H2S gas probable ........ .. _ _
Yes
_ _ Standard 112S monitoring will be utilized
34
Mechanical. condition of wells within AOR verified (For. service well only) _ _ _ _ _ _ _ _ _
NA
This well is a producer
35
Permit can be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
No
_ F -Pad wells are_H2S-bearing, H2S measures are required.. _ _
Geology
36
Data presented on potential overpressure zones . . . ..................
Yes
.. . Expected reservoir pressure is 7A.ppg EMW: will be drilled using 8.4 ppg mud & coiled tubing. _ .... .... .
Appr Date
37
Seismic.analysis of shallow gas zones ... ....................... _ _
NA
_ _ _ _ Should higher pore_ pressures be encountered, BP has immediate access to nearby, fluid mixing facilities.
SFD 12/10/2018
138
Seabed condition survey -(if offshore) ........................... _
NA
_ _ .........................
39
Contact name/phone for weekly. progress reports [exploratory only] ..
NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Date
D T's /Z./)N 1R (Z77) 'z vltd