Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-169DATA SUBMITTAL COMPLIANCE REPORT 5113/2019 Permit to Drill 2181690 Well Name/No. PRUDHOE BAY UNIT 03-3281-1 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21141-60-00 MD 13925 TVD 8934 Completion Date 2/15/2019 Completion Status 1-0I1 Current Status 1-0I1- UIC No REQUIRED INFORMATION / Mud Log No V/ Samples No Directional Survey Yes DATA INFORMATION List of Logs Obtained: MWD/GR/RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30462 Digital Data 11028 13925 3/15/2019 Electronic Data Set, Filename: 03- 32BL1_LWD_FINAL FIELD_COMPOSITE_10FE B2019_BHI CTK.Ias ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1_ GR_ Res_ 10FEB2019_MD_FINAL_FIELD _BHI_CTK.cgm ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1—GR _ Res_ IGFEB2019_TVDSS_FINAL_Fl ELD_BHI_CTK.cgm ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1—GR _ Res_ 10FEB2019_MD_FINAL_FIELD _BHI_CTK.pdf ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1—GR _ Res_ 10FEB2019_TVDSS_FINAL_Fl ELD_BHI_CTK.pdf ED C 30462 Digital Data 3/15/2019 Electronic File: 03-32BL1 Final Survey Report.pdf ED C 30462 Digital Data 3/15/2019 Electronic File: 03-32BL1 Final Survey Report.txt ED C 30462 Digital Data 3/15/2019 Electronic File: 03-32BL1 Surveys.csv ED C 30462 Digital Data 3/15/2019 Electronic File: 03-32BL1 Surveys.xlsx ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 326 L 1 _25_ta pescan_BHI — CTK. tM ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 326 L 1 _5_tapescan_BHI _CTK.txt ED C 30462 Digital Data 3/15/2019 Electronic File: 03-32BL1_output.tap AOGC'C Page I of 3 Monday, May 13, 2019 DATA SUBMITTAL COMPLIANCE REPORT 5113/2019 Permit to Drill 2181690 Well Name/No. PRUDHOE BAY UNIT 03-32811 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21141-60.00 MD 13925 TVD 8934 Completion Date 2/15/2019 Completion Status 1-0IL Current Status 1 -OIL UIC No ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1_ GR_ Res_ IOFE62019_MD_FINAL_FIELD _BHI_CTK.tif ED C 30462 Digital Data 3/15/2019 Electronic File: 03- 32BL1_ GR_ Res_ IOFEB2019_TVDSS_FINAL_Fl ELD_BHI_CTK.tif Log C 30462 Log Header Scans 0 0 2181690 PRUDHOE BAY UNIT 03-32BL1 LOG HEADERS ED C 30491 Digital Data 11028 13925 3/26/2019 Electronic Data Set, Filename: 03- 32BL1 LWD FINAL FIELD_COMPOSITE_10FE B2019 BHI CTK.Ias ED C 30491 Digital Data 3 /2 612 01 9 Electronic File: 03- 32BL1 -GR _ Res_ IOFEB2019_MD_FINAL_FIELD _BHI_CTK.cgm ED C 30491 Digital Data 3/26/2019 Electronic File: 03- 32BL1_ GR_ Res_ 10FEB2019_TVDSS_FINAL_Fl ELD_BHI_CTK.cgm ED C 30491 Digital Data 3/26/2019 Electronic File: 03- 32BL1—GR _ Res_ 10FEB2019_MD_FINAL_FIELD _BHI_CTK.pdf ED C 30491 Digital Data 3/26/2019 Electronic File: 03- 32BL1_GR Res_ 10FEB2019_TVDSS_FINAL_Fl ELD_BHI_CTK.pdf ED C 30491 Digital Data 3/26/2019 Electronic File: 03-32BL1 Final Survey Report.pdf ED C 30491 Digital Data 3/16/2019 Electronic File: 03-32BL1 Final Survey Report.txt ED C 30491 Digital Data 3/2612019 Electronic File: 03-32BL1 Surveys.csv ED C 30491 Digital Data 3/26/2019 Electronic File: 03-32BL1 Sumeys.xlsx ED C 30491 Digital Data 3/16/2019 Electronic File: 03- 32BL1 _25_tapescan_B H I_CTK.txt ED C 30491 Digital Data 3/2 612 01 9 Electronic File: 03- 3- 3281-1 326L1 _5_ta pes can_B H I_CTK. txt ED C 30491 Digital Data 3/26/2019 Electronic File: 03-32BL1_output.tap ED C 30491 Digital Data 3/26/2019 Electronic File: 03- 32BL1_ GRK.t_ Res_ 10FE82019_MD_FINAL_FIELD BHI CTif AOGCC Page 2 of 3 Monday, May 13, 2019 DATA SUBMITTAL COMPLIANCE REPORT 511 312 01 9 Permit to Drill 2181690 Well Name/No. PRUDHOE BAY UNIT 03-32BL1 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21141-60-00 MD 13925 TVD 8934 Completion Date 2/15/2019 Completion Status 1-0I1 Current Status 1 -OIL UIC No ED C 30491 Digital Data 3/26/2019 Electronic File: 03- 32BL1_ GR_ Res_ 10FEB2019_TVDSS_FINAL_Fl ELD BHI CTK.tif Log C 30491 Log Header Scans 0 0 2181690 PRUDHOE BAY UNIT 03-32BL1 LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED�- Completion Report / vY Production Test Information Y / !� Geologic Markers/Tops YO COMPLIANCE HISTORY Completion Date: 2/15/2019 Release Date: 12/20/2018 Description Comments: Compliance Reviewed By: Sample Interval Set Start Stop Sent Received Number Comments Directional / Inclination Data Mud Logs, Image Files, Digital Data Y /(9 Core Chips Y /� Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files(!) Core Photographs Y /�/ Daily Operations Summary 0 Cuttings Samples Y / (D Laboratory Analyses Y /yfA) Date Comments Date: A0G('C Page 3 of 3 Monday, May 13, 2019 BA ER 'f PRINT DISTRIBUTION (LIST UGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 03-32BL1 FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Ridengbhge.com 218169 30491 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska)Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE February 10, 2019 TODAYS DATE March 25, 2019 Revision Final Survey Report was Revised STATUS Rev 1 Replacement: CD Details: Rev. Requested by: -- COMPANY ADDRESS (FEDEX PALL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. E.OA, PROC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 ExxonMobil, Alaska A": Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas ##e Attn: Resource Evaluation ,550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 `*. Stamp "confidential" on all material deliver to DNR_] 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Merion Kendall J FIELD FINAL CD/DVD FINAL PRELIM 0 (las, dli"s PDF, META, SURVEY I REPORT LOGS LOGS CCM, Final Surveys) (Compass) # OF PRINTS9 ur rKIN # OF COPIES I# OF COPIES I# OF COPIES 4 l MAR 2 6 2019 AOGCC TOTALS FOR THIS PAGE: 0 0 5 2 0 0 0 1 0 0 TOTALS FOR THIS PAGE: 0 0 5 2 0 I BA�EER PRINT DISTRIBUTION LIST 1 a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 03-32BL1 FIELD Prudhoe Bav Unit COUNTY PRUDHOEBAY BHI DISTRICT Alaska PRELIM AUTHORIZED BY Patrick Rider EMAIL Patrick.Rlder(C�bhQe.COm STATUS Final Replacement: COMPANY ADDRESS (FEGEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V 1 BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 2181-9 3046E Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE February 10, 2019 TODAYS DATE March 13, 2019 Revision No Details: Rev. Requested by: FIELD I FINALCD/DVD FINAL PRELIM LOGS I (las, dlis, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES lig OF COPIES I# OF COPIES 3 Exxonsdobik Alaska l Attn: Lynda M. Vaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Atm: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division atoll & Gas *** Attu: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska Inc. Petrotechnical Data Center, 1,112-1 900 E. Benson Blvd Anchorage, Aladin 99508 Attn: Rana Elghonimy 0 0 1 1 0 GCC 0 1 0 TOTALS FOR THIS PAGE: n 2 4 2 0 Winston, Hugh E (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, March 13, 2019 5:14 PM To: Winston, Hugh E (DOA) Cc: Guhl, Meredith D (DOA) Subject: RE: PBU 03-3261-1, PTD# 218-169, Well location verification Huey, I apologize, both Top of Productive Interval and Total Depth in 4a should have been taken from the East line, 4b is correct. TOP Interval should read: 526' FSL, 5042' FEL Total Depth should read: 263' FSL, 4919' FEL I'll be happy to provide you a corrected copy tomorrow. Good catch and thanks for letting me know! Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 1 Office: (907) 564-4091 Subsurface & Wells Wof n tin M.a'agemont BP Exploration Alaska 1900 E. Benson Blvd. I Room: 7178 I Anchorage, AK From: Winston, Hugh E (DOA) <hugh.winston@alaska.gov> Sent: Wednesday, March 13, 2019 4:07 PM To: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Cc: Guhl, Meredith D (DOA) <meredith.guhl@alaska.gov> Subject: PBU 03-3261-1, PTD# 218-169, Well location verification Hi Joe, My name is Huey, I am a Stat Tech for the AOGCC. I am working on inputting data from a completion report and I've run into a problem. The database we use calculates the state plane coordinates of the TPI and the BHL based on the governmental coordinates given in the report and then cross references these with the reported state plane coordinates given in the report. The problem is that the values aren't matching. Could you please verify that the coordinates given on the report are accurate? The coordinates in box 4b match with the data in the survey so we think the problem may be with the coordinates given in box 4a. Thanks for your help. API # 50029211416000 PTD# 218-169 Well: PBU 03-32BL1 STATE OF ALASKA nILASKA OIL AND GAS CONSERVATION COMMISS'^N WELL MPLETION OR RECOMPLETION REPOT AND LOG MAIR 1 � /iIM9 la. Well Status: Gil 0 * Gas ❑ SPLUG ❑ Other ❑ Abandoned Cl Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development gip; Exploratory p v Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6, Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 2/15/2019 218-169 ' 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 9951 M612 2/4/2019 50-029-21141-60-00 ' 4a. Location of Well (Governmental Section): S. Date TO Reached: 16. Well Name and Number. 2/9/2019 PBU 03-32BL1 ' Surface: 332' FSL, 796' M4, Sec 111 �T10N, R15E, UM Top of Productive Interval: 526' FSL, 5042' FIL, Sec. 10, TION, RISE, UM 9 Ref Elevations KB 57.79 GL 27.80 BF 28.98 17, Field/Pool(s): PRUDHOE BAY, PRUDHOE OIL Total Depth: 263 FSL, 4919' FIL, Sec. 10, TION, RISE, UM 10. Plug Back Depth(MD/TVD): 18, Property Designation: • 11294'/8635' ADL 028327 8 028328 4b, 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11, Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 714086 . y- 5936395 • Zone - ASP 4 13925'/ 8934' 74-017 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/rVD: TPI: x- 708245 y- 5936423 Zone - ASP 4 Total Depth: x- 708376 y- 5936166 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re�dnllll-ateral Top Nhndow MD1TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) , 12886'18640' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 31' 111' 31' 111' 30" 1925# Poleset 13-3/8" 72# LA0 31' 2514' 31' 2514' 17-1/2" 2400 sax CS III, 400 sx CS II 9-5/8" 47# L -w 29' 5206' 29' 4984' 12-1/4" 500 sx Class'G', 300 sx CS 1 7" 26# L-80 4326' 10899' 4214' 8630' 8-1/2" 358 sx LiteCrele, 93 sx Class'G 4-1/2" 12.6# 13CM 10743' 12886' 8527' 8640' 6-1/8" 590 sx Class'G' 3-1/2"x2-7/8" 9.3#16.5# tones 11495' 1 13925' 8631' 1 8934' 4-1/4" 114 ax Class'G' 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD7TVD of Top and Bottom; Perforation GRADE DEPTH SET (MD) PACKER SET (MD/TV Size and Number; Date Perld): 4-1/2" 12.6# 13Cr80 10754' 10677' 18482' 2" Gun Diameter, 6 stiff 2/152019 13574-13624 8746-8771 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13663 - 13676 8791 -8798 Was hydraulic fracturing used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed information 13690 -13706 8806-8815 COMPLETION 13724 - 13735 8824-8830 13770 - 13775 8849-8852 QAT 13762 -13787 8856-8859 2 13799 - 13804 8865-8868 VERIF ED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas Iib, etc.): WA Data of Test: Hours Teatetl: Production for Oil -Bbl: Gas -MDF: Water -Bbl: Choke Size Gas -Oil Ratio: Test Period y Flory Tubing Casino Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity, -API food: Press 24 Hour Rate --III Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only 'A ul Y/s 6jr-ZIi4P 19 RBDMS�af� MAR 141019 "Q�� (% ("JI 28. CORE DATA Conventional Corals) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of tap and bottom of each), and summarize ethology and presence of oil, gas orwater (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 13572' 6745' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071, Shublik 13132' 8658' Sadlerochit - Zone 4B 13572' 8745' 42SB - Zone 4A 13819' 8876' Formation at total depth: Zone 4A 13819' 8876' 31. List of Attachments: Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R Authorized Title: SI ialist Contact Email: Ryan.Ciolkosz@bp.com Authorized Signature: Date: 3I (3I) Contact Phone: +1 907 564 5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Is. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemaling-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals coretl and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only V1ELLFEAD= MCEVOy ACRYITOR= DEV OKB.ELB/= 6Y FEF BEV - 67.79' BF. BLV = 28.98' KCP= 2891' Max Angle = 115'@11161' Dalen MD= 10925' DakanTVD= 8588' I3-3/8' CBG. 720, L-80. D = 12.347' SAFETY NOTES: -4-1/2- CHROME TBG, LNR 6 C� 3-32 B L 1 & L2 "'" I— Des 28.s @ 111299'. Minimum ID = 2.377"" @ 10990' 3-1/2" X 2-7/8" XO L-00, D - 8.681' 4-12' TBG, 12.60,13 -CR -80 VAM TOP, .0152 bpf, D = 3.958• 17' LNR 26#, L -BO BTGM, .0383 bpf, D = 6276' 70899' 13-12' LNR 9.30, 13CR-85 STL, .0087 bpf, D = 2.992' 4-12'MONOBOREWHPSTOCK(02/17/19) MLLOUT WINDOW (03-328 L2) 11296--11304' REF LOU on / / ANGLEATTOP P3iF 50' Q 10895' Refer to PmdwbDn DB for Nstomal pert data SPF I INTERVAL Op VW I DATE -SEE RAGE2 FORSUMMARY- 9.3#. 13CW95 STL, .0087 bpf, D - 2.992' MLLOUT WINDOW (03-32B L7) 12888'- 12895- 4-1/2' LNR 12.6#, 13 -CR -80 .0152 bpf, D = 3.958' 2- HISS X NP, D=3.813' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORE DATE 4 3504 3477 20 MdG DONE RK 16 03/01/19 3 5788 5516 22 KBG2 SO BK 22 03/01/19 2 7909 7020 60 KBG2 OMY BK 0 03/14/18 1 10611 8436 46 KBG2 DMY BK 0 03/14/18 4328' 9-5/8• X 7' HmZXPN LTPwrrEBACK SLV, D = 620' 434V9-58' X 7• BKR FMC LNR HGR D = 6.10' MLLOM WINDOW (03-328) 5206 - 5223' oo"�r4-12-HES XNP. D=3.813' —1 70777' -4-12" HES X NP, D = 3.813' 10742' 4-12' HES XN NP MLL®TO 3.80' (1121/18) i 10743' 7X5H:DZXPLTPw/f�ACK SLV, D = 5.560' 10764' 4-12' VWBG, D = 3.958' 10766' 7'X 5" HIM HMC HGR D = 4.440• 10776' S' X 4-12' XO, D = 3.920' 10968' 3.70' DEPLOY SLV, D=3.00' 10990' 3-12' X 2-7/8' XO, D = 2.377' !, 03-328 L2 I 12-7/8• LNR 6.56, 13CR-a5 STL, -0058 bpf, D = 2.441' -� 12176' 11496' 13.625' DEPLOY SLV, D = 3.00' — 1161T -� 3-12• X 2-7/8' XO, D = 2.377' 03-32B L I PBTD —I 13904' 4L7/8- LNR 6.5#, 13CR-85 STL, .0058 bpf, D = 2.441 • -� 13926' 1s71s' - r n� 13499' 4-12• BKR CBP DATE RB/ BY CDRNAENTS DATE RLV BY (XMaf mm 03/13/86 OFIG14AL COMPLETION 03/13/19 JJJJAD CORRECTED PEW DATES (L1 05/06/94 SMETRACKNVORKOVB2 03/13/19 J JJrD P138=S (03326 1-2) 03/08/09 MES BDETRACK(03-328) 03/13/19 CJNJ D GLV C/O(03101/19) 02/23/19 WCOR2 CTD (03-32B L7 & 1-2) 03/04/19 JM) DIbG HO 00RfiIECTDNS 03/06/19 WJM) FINAL ODEAPPROVAL PRLAHOE BAY LW VVELL: 03-326 L7 & L2 PBtMT fib: 2090050,'218-169 AR No: 50-029-21141-02-00.(61) SEC 11, T1 OR R15F-332' FSL & 796' FVYL SP Exploration (Alaska) North Arnedra - ALASKA - BP Operation Summary Report Common Well Name: 03-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 2/4/2019 Eno Date: 2/10/2019 X3 -0198Y -C: (1,440,988,00) Project: PBU Site: 03 Active datum: KB @57.79usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth (hr) (usR) 2/4/2019 11:00 - 1215 1.25 RIGU P ---- 12:15 - 15:30 3.25 RIGU P 15:30 ` 4.00 RIGU P - 19:30 19:30 - 00:00 4.50 RIGU P 2/5/2019 .0000 - 0230 2.50 RIGU P 02:30 - 09:00 6.50 BOPSUR P Pagel of 9 BPUOI: USA00001395 Phase Descnption of Operations PRE FINISH RIG DOWN CHECKLISTS -PJSM WITH NES ON PULLING OFF WELL WITHOUT TWC. - ASSIGNED SPOTTERS, DISCUSSED 12X 12 WHEEL CHOCK. VERIFIED RADIO COMMUNICATION. - DISCUSSED WELL NOT HAVING A TWC 'INSTALLED. PRE MOVE RIG OFF WELL 12. MOVE DOWN PAD. SPOT MAIN SUB / PIT MODULE "`_RIG ACCEPTED 15:30_"' PRE PERFORM RIGUP CHECKLISTS - OPEN ALL TREE VALVES UP AGAINST TRANSDUCER TO MONITOR FOR THERMAL EXPANSION PRE PERFORM 3500# LTT BETWEEN SWAB AND MASTER VALVE - INSTALL MANAGE PRESSURE LINE - NIPPLE DOWN TREE CAP - NIPPLE UP BOPE STACK -STAB INJECTOR. PRE FLUID PACK REELAND RIG IRON - PURGE AIR OUT OF ALL LINES - VALVE CREW GREASE SWAB/ MASTER / TANGO VALVES - VALVE CREW TORQUE TREE -SHELLTEST TO 3700# GOOD PRE INITIAL BOPE TEST 250 PSI LOW /3500# HIGH TO BP, NABORS, AOGCC CRITERIA 7-1/16" SK STACK. ANNULAR, BLIND/SHEAR RAM, 2-3/8" PIPE/SLIP, 2-3/8" x 3-117' VARIABLE RAM, 2-3/8" PIPE/SUP RAM -TEST #10: IRV, PACKOFF, C9 BACKWARD, C10 BACKWARD PASS -TEST #01: MASTER, BLIND SHEAR RAM, R1, BL1A, B7, B4 PASS OPEN BLIND/SHEAR. TROLLEY INJECTOR BACK TO PIPE SHED. (SIMOPS: BHI INSTALL FLOATS IN UQC) - INSTALLTEST CAP MULTI -JOINT DRESSED FOR 2-3/8" - TEST#02: ANNULAR (2-318"), TIW#1, B3, B2, BL1 PASS - TEST#03: UPPER 2-3/8" PIPE/SLIP, TIW#2, BL2, R2, T2, C15 PASS - TEST #04: C16, T1, C11 PASS - TEST #05: VARIABLES (2-3/8"), C7, C9, C10, TV2-PASS - TEST #06: LOWER 2-3/8" PIPE / SLIPS, C5, C6, C8, TV1 - PASS - TEST #07: CHOKE A, CHOKE C - PASS START TESTING GAS ALARMS - CONDUCT DRAWDOWN TEST, RECORD CLOSING TIMES. RECONFIGURE TEST JOINT FOR REMAINING BOP TESTS. TEST #08: ANNULAR (3-1/2"), C1, C4- PASS TEST #09: VBRS (3-1/2"), C2, C4 - PASS Printed 3/11/2019 10:43:05AM "All depths reported in Drillers Depths" Printed 3/11/2019 10:43:05AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 2 of 9 Operation Summary Report Common Well Name: 03-32 AFE Na Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/4/2019 End Date: 2/10/2019 X3-019BY-C: (1,440,988,00) Project: PBU Site: 03 Rig Name/No.: CDR-2 Spud Date/Time: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 09:00 - 11:30 2.50 BOPSUR P PRE RD TEST EQUIPMENT AND RU TO TEST THE CTC AND THE BHI CHECK VALVES - PRESSURE UP TO 250 LOW PT, NO VISIBLE LEAKS - PRESSURE UP TO HIGH PT 4700 PSI - GOOD PT, BLEED OFF & TEST BHI DFCVS AND SERVICE CHOKE & KILL LINE VALVES '- LOAD VC LUBRICATOR ON THE RIG 11.30 - 13'.00 1.50 BOPSUR P PRE HOLD RIG EVAC WITH BOTH NABORS CREWS & VALVE CREW AT CHANGE OUT THEN SEND NIGHT CREW AND VC TO RU TO PULL TWO '- HOLD PRE-SPUD WITH BEARD'S CREW 13:00 - 15:30 2.50 BOPSUR P PRE FLUID PACK STACKTO PT VC LUBRICATOR - PRESSURE UP TO 250 FOR VISUAL LTT - GOOD LOW GO TO 3700 HIGH PT - PRESSURE IS INCREASING BECAUSE OF THERMAL EXPANSION, BLEED OFF AND RETEST LOW VISUALAND HIGH PT - GOOD PT, BLEED OFFAND OPEN UP TO TWO, (WELL ON VAC WHEN TWO WAS SET) TWO PULLED, 0 PSI ON WELL - CLOSE M & S VALVES, LTT CONFIRMED - LD TWC, CONFIRMED SEAL IS STILL INTACT, LOAD OUT -SWAP OUT METH PUPS 15:30 - 1T15 1.75 BOPSUR P PRE INSTALL NIGHT CAPAND PT - HOLD PJSM TO BH KILL WELL - LINE UP ON NEAT METH - ONLINE WITH KCLAT 4.7 BPM AT 2465 PSI - WHIP PEAKEDAT 2730 PSI THEN STARTED DROPPING-75 BELS AWAY 1715 - 2100 3.75 BOPSUR P PRE SHUT DOWN PUMP AND MONITOR WELL - INITIAL LOSS RATE -12 BPH - AS HIGH VIS PUSHED OUT. LOSS RATE WAS INCREASING TO 60 BPH - DISCUSS WITH ODE. DISCUSS SWAPPING TO MUD - TEST BREAK FROM PULLING TWC. - SWAP COIL OVER TO MUD. - BULLHEAD 30 BBLS HIVIS MUD, 170 BBLS MUD. CIRCULATE ACROSS TOP. LOSS RATE DOWN TO 4._0 BPH. 21:00 - 00:00 3.00 STWHIP P 5,155.00 WEXIT PERFORM FLOW CHECK. GOOD FLOW CHECK - FILL HOLE. 4.0 BPH LOSS RATE. -MAKE UP WHIPSTOCK BHA. -OPEN EDC, BREAK CIRCULATION. -0.54 BPM IN/0.59 BPM OUT - 8.80 PPG IN 18.81 PPG OUT _- LOSING PIPE DISPLACEMENT _ 2/6/2019 0000 - 0145 1.75 STWHIP P 5,155.00 WEXIT RIH WITH WHIPSTOCK SETTING BHA#1 - RATE: 0.51BPM IN, 0.43 BPM OUT. CIRC PRESSURE: 1560 PSI - MUD WEIGHT: 8.82 PPG IN, 8.83 PPG OUT Printed 3/11/2019 10:43:05AM **All depths reported in Drillers Depths" North America - ALASKA - SP Operation Summary Report Page 3 of 9 Common Well Name'. 03-32 MOTORS, SERVICE RIG TIME FOR AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 2/4/2019 End Date: 2/10/2019 X3 -0198v -C: (1,440,988 00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. CONTINUE RIH, DRV TAG AT 12886'. BPUOI: USA00001395 Active datum'. KB @57.79us8 (above Mean Sea Level) WEXIT MILL 3.80" WINDOW IN 4-1/2" CASING PER Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (us8) - MUD WEIGHT: 8.83 PPG IN, 8.77 PPG OUT 01:45 - 06:15 4.50 STWHIP P 12,990.00 WEXIT - LOG DOWN FOR TIE-IN FROM 11100'TO - CIRC PRESSURE: 3085 PSI 2000 - 00'.00 4.00 STWHIP P 11347' MD (FORMATION) WITH -27.5' WEXIT MILL 3.80" WINDOW IN 4-1/2" LINER PER BAKER REP FROM 12889' MD TO 12893.1' MD CORRECTION SLOW PROGRESS, BACK RATE DOWN - RIH TO CCL LOGGING DEPTH - MUD WEIGHT: 8.70 PPG IN, 8.60 PPG OUT - LOG CCL DOWN FROM 12690' TO 12990' NO - DWOB: 3.0-3.5 KLBS -CIRC PRESSURE: 2758# LOSS RATE: 6 DATA POINTS BPH - PICK BACK UP TO 12690' 06:15 - 0900 2.75 STWHIP P 12,990.00 WEXIT DISCUSS SET DEPTH WITH ODE - WE ARE TIED INTO THE PDC LOG AND THE COLLARS AT DEPTH ARE COMING IN 6' DEEPER - SHIFT SET DEPTH FOR TOWS DOWN TO 12883' BASED ON COLLAR DEPTH -8' BELOW THE COLLAR -PU Wr=50K - RIH TO 12895.45' BOTTOM OF WS, PLACING TOWS AT 12883' (WS LENGTH = 12.45') -PU Wr= 50K, PU TO 45KAND STOP - CLOSE THE EDC AND SET WS AS PER PLAN 140°LOHS - WS SETAT 3700 PSI, WOB AT -3K WHEN WE SET, SET DOWN TO 3K FOR 6K WOB - WS IS SET NO MOVEMENT - PU OFF WS, WE ARE FREE ! -ON LINE WITH PUMP AT DRILLING RATE TO CHECK LOSS RATE BEFORE POOH LOSSES MINIMAL AT 0.3 BPM, _POOH 09:00 - 11:00 2.00 STWHIP P 12,990.00 WEXIT LOST 16 BBLS DURING TOOH - FLOW CHECK WELL - GOOD NO FLOW CHECK, PU INJECTOR AND LD THE WS SETTING TOOLS - 09:25 INJECTOR OFF - BHA LD, GAUGE MILL= 3.80 GO 3.79 NO GO, REAMER = 2.79 GO 2.78 NO GO - MU MILLING BHA - INJECTOR ON AT 10:45_ 111:00 11:30 0.50 STWHIP P 12,990.00 WEXIT INJECTOR NEEDS GEAR LUBE IN THE DRIVE Printed 3/11/2019 10:43.05AM **All depths reported in Drillers Depths" MOTORS, SERVICE RIG TIME FOR MAINTENANCE 11:30 - 14:00 2.50 STWHIP P 12,990.00 WEXIT RIH WITH MILLING BHA. TIE-IN DEPTH FROM 11200', CORRECT -30.5'. WEIGHT CHECK IS 48K. _ CONTINUE RIH, DRV TAG AT 12886'. 14:00 - 20:00 It= STWHIP P 12,990.00 WEXIT MILL 3.80" WINDOW IN 4-1/2" CASING PER BAKER REP FROM 12885.5' MD TO 12889' MD - RATE: 2.87 BPM IN, 2.72 BPM OUT - MUD WEIGHT: 8.83 PPG IN, 8.77 PPG OUT - DWOB: 2.0 - 3.0 KLBS - CIRC PRESSURE: 3085 PSI 2000 - 00'.00 4.00 STWHIP P 12,893.10 WEXIT MILL 3.80" WINDOW IN 4-1/2" LINER PER BAKER REP FROM 12889' MD TO 12893.1' MD SLOW PROGRESS, BACK RATE DOWN - RATE: 2.60 BPM IN, 2.52 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.60 PPG OUT - DWOB: 3.0-3.5 KLBS -CIRC PRESSURE: 2758# LOSS RATE: 6 BPH Printed 3/11/2019 10:43.05AM **All depths reported in Drillers Depths" North America - ALASKA - 13P Page 4 of 9 Operation Summary Report Common Well Name: 03-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Data. 2/4/2019 End Date. 2/10/2019 X3 -0198Y -C: (1,440.988 00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud DateRme: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 2/7/2019 0000 - 0200 2.00 STWHIP P 12,895.50 ' WEXIT MILL 3.80' WINDOW IN 4-1/2" LINER PER 02:00 - 0400 2.00 STWHIP P 04.00 - 05'.15 1.25 STWHIP P 05:15 - 05:30 0.25 STWHIP P 05:30 - 08:00 2.50 STWHIP P 08:00 - 09:45 1.75 STWHIP N 09:45 - 11:00 1.25 STWHIP P 1100 - 12:30 1.50 DRILL P BAKER REP FROM 12893.1' MD TO 12895.5' MD - RATE: 2.62 BPM IN, 2.52 BPM OUT - MUD WEIGHT: 8.71 PPG IN, 8.65 PPG OUT -DWOB: 2.5-3.5 KLBS - CIRC PRESSURE: 2832 PSI LOSS RATE 6 BPH - MILL EXITED 12894.5' -STRING REAMER EXITED_ AT 12895.5' 12,905.00 WEXIT BEGIN MILLING RATHOLE FROM 12895.5 TO Printed 3/11/2019 10:43:05AM **All depths reported in Drillers Depths" 12905 - RATE: 2.62 BPM IN, 2.57 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.65 PPG OUT - DWOB: 3.9 KLBS - CIRC PRESSURE: 2832 PSI LOSS RATE 5 BPH -ROP 4FPH - PUMP 5 BBLS LOVIS / 5 BELS HIVIS 12,905.00 WEXIT REAM WINDOW - PERFORM REAMING PASSES AT WMIN. - RATE: 2.63 BPM IN, 2.55 BPM OUT - PU: 42 KLBS, SO: 19 KLBS SHUT DOWN PUMPS, DRY DRIFT WINDOW 12,905.00 WEXIT PERFORM 10 MIN PUMP OFF FLOW CHECK -PAINT YELLOW FLAG 12870.65. - FLOW CHECK IS GOOD, OPEN EDC. - BOTTOMS UP SAMPLE HAS METAL, CEMENT, ONLY TRACE OF FORMATION. 12,905.00 WEXIT POOH. MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.70 PPG IN, 8.65 PPG OUT - RATE: 3.11 BPM IN, 2.90 BPM OUT OPEN EDC, POH -CIRC PRESSURE: 2585 PSI - PU 44 KLBS - PULL SLOWLY THROUGH SUMP AREA OF WELL, TRY TO CIRC DECENT SAMPLE UP. SAMPLE FROM SUMP DEPTH SHOWS JUST TRACE OF FORMATION. 12,905.00 WEXIT STOP 50' FROM TAG FOR FLOW CHECK. FLOW CHECK THROUGH NEEDLE VALVE ON RIG FLOOR, FLOW DIMINISHING SLOWLY. USE 12 OZ CUP TO FINGERPRINT FLOWBACK AS VOLUMESARE TOO SMALLTO RECORD WITH PVT SENSORS. FLOWBACKS STARTAT 24 SEC TO FILLA 12 OZ CUP, AFTER 1 HR 45 MIN FLOW HAS DIMINISHED TO>10 MIN TO FILL IT. TOTAL FLOWBACK VOLUME DURING THIS TIME IS 0.3 BELS, CONDUCT PJSM WHILE RECORDING FLOWBACKS. 12,905.00 WEXIT LIFT UP INJECTOR, OFF AT 10:00 INSPECT LAST 50' OF CT, NO FLAT SPOTS SEEN. LAY DOWN MILLING BHA #2. MILLAND REAMER 3.80" GO, 3.79" NO GO. 12,905.00 PROD1 MAKE UP I ST DRILLING SHA#3 AND TEST. INJECTOR ON AT 11:30, TOP SECTION OF TOOL TESTS BAD. Printed 3/11/2019 10:43:05AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 5 of 9 Common Well Name: 03-32 - 1600 3.00 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/4/2019 Eno Date'. 2/10/2019 X3 -0198Y -C: (1,440,986 00 ) Project: PBU Site: 03 12,905.00 PROD1 RIH WITH 4.25" DRILLING BHA#3. Rig Name/No.: CDR -2 Spud DateMme: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. -MUD WEIGHT: 8.67 PPG IN, 8.68 PPG OUT BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) (FORMATION) WITH -33' CORRECTION. Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) PASS WINDOW 15 FT/MIN, 0 PUMP, 140L NO (usfo _ 12:30 - 13:00 0.50 DRILL N 12,905.00 PROD1 PJSM WITH ONCOMING CREW FOR C/O BHA. 13'.00 - 1600 3.00 DRILL P 1600 - 1830 2.50 DRILL P 18:30 - 20:30 20:30 - 22:15 22:15 - 22:30 -2:30 - 0000 2.00 DRILL P 1.75 DRILL N 0.25 DRILL P 1.50 DRILL P Printed 3/1V2019 10.43:05AM **All depths reported in Drillers Depths" LIFT INJECTOR CART UP AND SLIDE BACK. OFF AT 12:15. MAKE UP NEW TOP SECTION. INJECTOR ON AT 12:45. BHI TOOL AND OTS TESTS GOOD. 12,905.00 PROD1 RIH WITH 4.25" DRILLING BHA#3. I - RATE: 0.52 BPM IN, 0.83 BPM OUT. CIRC PRESSURE: 1320 PSI -MUD WEIGHT: 8.67 PPG IN, 8.68 PPG OUT - LOG DOWN FOR TIE-IN FROM 11245' (FORMATION) WITH -33' CORRECTION. - UP WT AT WINDOW IS 49K. - CLOSE EDC. 13,020.00 PROD1 PASS WINDOW 15 FT/MIN, 0 PUMP, 140L NO ISSUES. TAG BOTTOM AT 12905'. PICK UP TO BREAKOVER + 2 FT, BRING PUMP TO 2.8 BPM. DRILL 4.25' LATERAL FROM 12905' MD TO 13020' MD - FREE SPIN: 3030 PSI, 2.83 BPM - RATE: 2.83 BPM IN, 2.50 BPM OUT. CIRC PRESSURE: 3000 - 3350 PSI - MUD WEIGHT: 8.74 PPG IN, 8.69 PPG OUT, ECD: 10.42 PPG - ROP: 70 - 110 FT/HR, WOB: 2 - 3 KLBS 13,102.00 PROD1 DRILL 4-1/4" LATERAL FROM 13020'MD TO 13102' - FREE SPIN: 3116 PSI, 2.92 BPM - RATE: 2.92 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 3142 - 3368 PSI - MUD WEIGHT: 8.68 PPG IN, 8.74 PPG OUT, ECD: 10.52 PPG - FOR 100-110 FT/HR, WOB: 2.8 - 3.5 KLBS 13,102.00 PROD1 DIFFERENTIALLY STUCK - PULL -15K ON WOB. ABLE TO ORIENT. STUCK BETWEEN DPS AND HOT - COME OFFLINE. LET RELAX 5 MIN. START MIXING SPACERS FOR LVT - WORK PIPE. DID NOT PULL FREE. -CIRCULATE WHILE FINISH RIGGING UP LVT - 2.89 BPM IN 12.69 BPM OUT - 8.73 PPG IN / 8.71 PPG OUT 10.47 PPG ECD WITH FULL OPEN CHOKE. - PUMP 10 BBLS 1% VISCOSIFIED KCL, 20 BBLS LVT, 10 BBLS VISCOSIFIED KCL - PUMP 10 BBLS LVT OUT BIT, SOAK FOR 20 MIN POP FREE - CONTINUE CIRCULATING SPACERS / LVT OUT 13,102.00 PROD1 LOG TIE IN AT RA -+7' CORRECTION - HEAD BACK TO DRILLING -CIRCULATE LVT OUT WHILE DRILLING 13,142.00 PROD1 DRILL 4-1/4" LATERAL FROM 13102'TO 13142' - FREE SPIN: 2982 PSI, 2.87 BPM - RATE: 2.87 BPM IN, 2.62 BPM OUT. CIRC PRESSURE: 2982 - 3368 PSI - MUD WEIGHT: 8.76 PPG IN, 8.69 PPG OUT, ECD: 10.50 PPG - ROP: 80 FT/HR, WOB: 2.8- 3.3 KLBS Printed 3/1V2019 10.43:05AM **All depths reported in Drillers Depths" Commor Well Name. 03-32 Event Type. RE-ENTER- ONSHORE(RON) North America -ALASKA - BP Operation Summary Report Start Date: 2/4/2019 Page 6 of 9 AFE No End Date. 2/10/2019 X3 -0198Y -C'. (1,440.988 00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time. 8/24/1984 12:00:OOAM Rig Release: Active datum: KB @57.79usft (above Mean Sea Date From - To HIM (hr) 2/8/2019 00:00 - 01.30 1.50 BPUOI: USA00001395 Task Code NPT Total Depth Phase Description of Operations (usft) - _--- 10111 P 1318600 PROD1 DRILL4-1/4"LATERAL FROM 13142'MD TO 01:30 - 0230 1.00 DRILL 13186 - FREE SPIN: 3033 PSI, 2.86 BPM - RATE: 2.87 BPM IN, 2.67 BPM OUT. CIRC PRESSURE: 3033-3329 PSI - MUD WEIGHT: 8.76 PPG IN, 8.73 PPG OUT, ECD: 10.49 PPG - ROP: 60-80 FT/HR, WOB: 2.2 - 3 4 KLBS P 13,210.00 PROD1 DRILL 4-1/4" LATERAL FROM 13186' TO 13210' - FREE SPIN: 3033 PSI, 2.86 BPM - RATE: 2.85 BPM IN, 2.66 BPM OUT. CIRC 'PRESSURE: 3033-3329 PSI - MUD WEIGHT: 8.77 PPG IN, 8.72 PPG OUT, ECD: 10.50 PPG - ROP: 40 FT/HR, WOB: 2.2 - 3.4 KLBS 13150' _ SAMPLE SHUBLIK 0230 - 0245 0.25 DRILL P 13,210.00 PROD1 150' BHA WIPER 0245 - 0500 2.25 DRILL P 13,265.00 PROD1 DRILL 4-1/4'LATERAL FROM 13210'7013290' 05:00 - 07:30 2.50 DRILL 07:30 - 1000 2.50 DRILL 1000 - 15:00 5.00 DRILL - FREE SPIN: 3060 PSI, 2.86 BPM - RATE: 2.86 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 3060-3270 PSI - MUD WEIGHT: 8.75 PPG IN, 8.71 PPG OUT, ECD: 10.50 PPG -ROP: 20-30 FT/HR, WOB: 3.4-4.2 KLBS P 13,265.00 PROD1 DRILL 4-1/4"LATERAL FROM 13290' - FREE SPIN: 3060 PSI, 2.88 BPM - RATE: 2.88 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 3060 PSI - MUD WEIGHT: 8.75 PPG IN, 8.71 PPG OUT, ECD: 10.52 PPG - ROP: 15 FT/HR, WOB: 3.0 KLBS - AT 13350' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. P 13,265.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW FROM 13360' MD TO 11 000'MD KEEP AS DRILLED TF THROUGH SHALES, NOTHING SEEN. - RATE: BPM 2.881N, 2.62 BPM OUT. CIRC PRESSURE: 2950 PSI - PULL THROUGH WINDOW AND OPEN EDC, PUMP 3.9 BPM. - STEADY AMOUNT OF CUTTINGS, NO DISCERNABLE INCREASE WITH SWEEPS - PULL THROUGH SUMP AREA IN ORIGINAL WELLAT 30 FT/MIN, NO INCREASE IN CUTTINGS ON THIS B/U. - CLOSE EDC, PASS THROUGH WINDOW AT 140L, 0 PUMP, 15 FT/MIN NOTHING SEEN - LOG DOWN FOR TIE-IN FROM 12920' (RA) +4.5' CORRECTION - RIH PAST SHALES WITH REDUCED PUMP, AS DRILLED TF NOTHING SEEN, P 13,265.00 PROD? DRILL 4-1/4' LATERAL FROM 13360'7013480' - FREE SPIN: 2850 PSI, 2.80 BPM - RATE: 2.80 BPM IN, 2.57 BPM OUT. CIRC PRESSURE: 3060 PSI - MUD WEIGHT: 8.70 PPG IN, 8.68 PPG OUT, ECD: 10.42 PPG AT BIT - ROP: 40.60 FT/HR, WOB: 2- 3.0 KLBS -AT 13450' PUMP 5 BBLS LO / HI VIS SWEEPS Printed 3/11/2019 1M43:05AM ••AII depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Common Well Name: 03-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date 2/4/2019 End Date: 2/10/2019 X3-019BY-C. (1,440,988 00 ) Project: PBU Site. 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00 OOAM Rig Release: Active datum: KB @57.79us8 (above Mean Sea Level) Page 7 of 9 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (us6) 1500 - 1900 4.00 DRILL P 13,356.00 PRODI DRILL 4-1/4' LATERAL FROM 13480'7013536' - FREE SPIN: 2800 PSI, 2.84 BPM - RATE: 2.84 BPM IN, 2.53 BPM OUT. CIRC PRESSURE: 2810 PSI '- MUD WEIGHT: 8.70 PPG IN, 8.66 PPG OUT, ECD: 10.34 PPG AT BIT - ROP: 10-20 FT/HR, WOB: 2 - 3.0 KLBS '- PULL 100' WIPER AT 13480' TO TRYAND IMPROVE ROP. 19:00 - 2230 3.50 DRILL P 13.650.00 PROD1 DRILL4-1/4- LATERAL FROM 13536'70 13651' - FREE SPIN: 2879 PSI, 2.84 BPM '- RATE: 2.84 BPM IN, 2.53 BPM OUT. CIRC PRESSURE: 3073 PSI - MUD WEIGHT: 8.72 PPG IN, 8.72 PPG OUT, ECD: 10 42 PPG AT BIT - ROP: 60 FT/HR, WOB'. 2 - 3.0 KLBS 2230 - 23'.30 1.00 DRILL P 13,669.00 PROW DRILL 4-1/4' LATERAL FROM 1365VTO 13669' - FREE SPIN: 2884 PSI, 2.83 BPM - RATE: 2.84 BPM IN, 2.53 BPM OUT. CIRC PRESSURE: 288470 3051 PSI - MUD WEIGHT: 8.72 PPG IN, 8.71 PPG OUT, ECD: 10.42 PPG AT BIT _.-ROP: 30 FT/HR, WOB:_2-3.0_K_L_B_S 23:30 - 00:00 0.50 DRILL P 13,669.00 PROW PERFORM LONG WIPER - PULL THROUGH WINDOW WITHOUT ISSUE. _- COME OFFLINE. 2/9/2019 00:00 - 00:15 0.25 DRILL P 13,669.00 PROD1 ATTEMPTED MULTIPLE TIMES TO OPEN EDC. NO COMMS WITH EDC. 0015 - 01:15 1.00 DRILL P 13,669.00 PROD1 FLOW CHECK, FINGERPRINT AGAINST PREVIOUS. DIMINISHING TIMES TO FILL 12 OZ CUP. LVT FLOATING IN LUBRICATOR FROM LAST DIFFERENTIAL STICKING EVENT. PURGE TO TIGER TANK. DISCUSS WITH ODE. PULLOUT OF HOLE 01.15 - 04'.00 I 2.75 1 DRILL N 13,669.00 PROD1 POOH - MUD WEIGHT: 8.74 PPG IN, 8.73 PPG OUT - RATE: 2.6 BPM IN, 2.0 BPM OUT - PUMPED 10 BBL HIVIS PILL WHILE PULLING THROUGH SUMP - STEADY BAND OF SOLIDS COMING ACROSS SHAKER. NO SIGNIFICANT INCREASE IN . CUTTINGS 04:00 - 06:00 2.00 DRILL N 13,669.00 PROD1 STOP 100' FROM SURFACE AND FLOWCHECK. FLOWBACK TREND SIMILAR TO LAST BHA, DIMINISHING SLOWLY. USE 12 OZ CUP FILL TIMES TO ESTABLISH DECREASING FLOWBACK TREND AS VOLUMES TOO SMALL TO RECORD ON PVT SENSORS. CONDUCT PJSM FOR CHANGING BHA. TOTAL VOLUME FLOWED BACK IS 0.3 BBLS. 0600 - 0700 1.00 DRILL N 13,669.00 PROD1 OPEN RISER, INSPECT LAST 50' OF CT FOR FLAT SPOTS, NONE FOUND. REMOVE BHA#3. INJECTOR OFF AT 06:20 BEND MOTOR TO 1.5 DEG. REPLACE STRIPPER ELEMENT, INSTALL NOZZLE -AND TORQUE UP. Printed 3/11/2019 10*43:05AM **All depths reported in Drillers Depths" Printed 3/11/2019 10.43:05AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 8 of 9 Operation Summary Report Common Well Name'. 03-32 AFE No Event Type'. RE -ENTER -ONSHORE (RON) Start Date'. 2/4/2019 End Date. 2/10/2019 X3-019BY-C: (1,440,988.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00:OOAM Rig Release. Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To HIM Task Code NPT Total Depth Phase Description of Operations (hr) __. Net) 07:00 - 08:15 1.25 DRILL P 13,669.00 PROD1 CLOSE SWAB. WU INJECTOR TO WELL, PT STRIPPER TO BOP TEST CRITERIA 250 / 3500 PSI. 08:15 - 0900 0.75 DRILL N 13,669.00 PROD? LIFT INJECTOR OFF WELL, REMOVE NOZZLE. WU BHA #4. TEST QTS TO 3500 PSI AND COILTRAK TOOL, GOOD. INJECTOR ON AT 08:50 09:00 - 12:00 3.00 DRILL N 13,669.00 PROD1 RIH WITH 4.25" DRILLING BHA #4 - RATE: 0.50 BPM IN, 0.79 BPM OUT. CIRC PRESSURE: 1530 PSI - MUD WEIGHT: 8.72 PPG IN, 8.76 PPG OUT - MAINTAIN 10.4 PPG AT WINDOW WHILE RIH. - LOG DOWN FOR TIE-IN FROM 11240' WITH -18' CORRECTION. 1200 - 1745 5.75 DRILL P 13,921.00 PRODi 'PASS THROUGH WINDOW WITH 0 PUMP, 140L, 20 FT/MIN NOTHING SEEN. DRILL 4-1/4" LATERAL FROM 13667 TO 13921' - FREE SPIN: 3000 PSI, 2.82 BPM - RATE: 2.82 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 3000-3200 PSI - MUD WEIGHT: 8.79 PPG IN, 8.73 PPG OUT, ECD: 10.47 PPG AT BIT - ROP: 60 - 70 FT/HR, WOB: 2 - 3.0 KLBS -AT 13770' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. AT 13820' PULL 150' WIPER, CLEAN PASS UP AND DOWN. - AT 13880'PUMP S BBLS LO/HI VIS SWEEP. -TO CALLED AT 13921 AFTER OWC SEEN AT 13885' - WIPER TO WINDOW 17'.45 - 20'.00 2.25 DRILL P 13.925.00 PROD1 WIPER - RATE: 2.81 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 2974 PSI - MUD WEIGHT: 8.81 PPG IN, 8.82 PPG OUT - PERFORM JOG AT WINDOW -DROP RATE. LOG RA TAG +8' CORRECTION - RUN TO BOTTOM AT MINIMUM RATE. -SETDOWNAT13270'. PICKUPANDTRY TWICE WITHOUT PUMPS. BRINGUPTO DRILLINGRATE. WORKTHROUGH - DROP RATE. RIH TO A CORRECTED TO OF 13925' - BRING PUMPS TO DRILLING RATE. - WIPER IN OPEN HOLE. TOOK OVERPULLS AT 13417, 13340, AND 13264' -JOGATWINDOW. PULL THROUGH WINDOW 2000. - 22'.40 2.67 DRILL P 13,925.00 PRODi OPEN EDC. - 3.81 BPM IN / 3.46 BPM OUT -8.80 PPG IN /876 PPG OUT -8000' STARTED GETTING SIGNIFICANT AMOUNT OF SHUBLIK. GEOLOGY VERIFIED. BIGGEST PIECES 1" x Vic 1/4". -CONTINUE CIRCULATING UP 7O 6500'. JOG IN HOLE 100'. PULL SLOWLY TO 6500' -TOOK 3 CIRCULATIONS TO CLEANUP. Printed 3/11/2019 10.43:05AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 9 of 9 Common Well Name. 03-32 DRILL P AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 214/2019 Eno Date. 2/10/2019 X3 -0198Y -C'. (1,440.988.00) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/time: 8/24/1984 12.00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) OPEN EDC 2240 - 0000 1.33 DRILL P 13,925.00 PROW RIR 2/10/2019 00:00 - 02:00 2.00 DRILL P - RATE: 3.63 BPM IN, 3.83 BPM OUT. CIRC PRESSURE: 3177 PSI - MUD WEIGHT: 8.79 PPG IN, 8.93 PPG OUT (MANUAL WEIGHT 8.7 PPG) PREPARE TO BACK FLUSH MICROMOTION AT WINDOW - MICROMOTION PLUGGING OFF. BACKFLUSH. BACK TO NORMAL CIRCULATION 13,925.00 PROD1 CONTINUE IN HOLE. LOG RA WITH +10' CORRECTION CLOSE EDC. - 0.25 BPM IN 0.28 BPM OUT - 8.74 PPG IN 18.75 PPG OUT BOBBLED THROUGH TROUBLE AREAS BUT NEVER SAT DOWN PERFORM DYNAMIC FLOW CHECK OFF 'BOTTOM. STILL LOSING FLUID CONTINUE TO BOTTOM. SEND BEADED LINER PILL 02:00 - 03:00 1.00 DRILL P 13,925.00 PROD1 LAY IN LINER RUNNING PILL -0.66 BPM IN /0.33 BPM - NO ISSUES PULLING THROUGH OPEN HOLE. -COME THROUGH WINDOW WITHOUT ISSUE. _ OPEN EDC 0300 - 05:30 2.50 DRILL P 13,925.00 PROD? EP MUD LUBE PILL - PUMP 30 BBLS OF EP MUD LUBE PILL. -CHASE WITH MUD SYSTEM, SEND TO TIGER TANK AT WINDOW CIRC 9.8# MUD AROUND. 05:30 - 08:20 2.83 DRILL P 13,925.00 PROD1 POOH AFTER 9.8# MUD AT BIT. FLAG PIPE AT 11105' EOP AND 10067' EDP. HOLD 10.5 PPG ECD FOR START OF TRIP AND SLOWLY REDUCE TO 9.8#. 08:20 - 09:00 0.67 DRILL P 13,925.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC, POWER DOWN - INJECTOR OFF: 08:30 LO DRILLING BHA, BIT IS 1-1. FLAT SPOT IS FOUND ON CT, 0.154" WALL THICKNESS IS 18% THICKNESS LOSS. DISCUSS WITH ODE AND DECIDE TO CUT IT OUT. 09:00 - FILL WELL WITH 2.7 BBLS. SWAP TO CON EVENT FOR THIS WELL. Printed 3/11/2019 10:43:OSAM **All depths reported in Drillers Depths" Common Well Name. 03-32 Event Type: COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Operation Summary Report Start Date. 2/10/2019 End Date 2/15/2019 Site: 03 AFE No X3-019BY-C: (482,803.00 ) Page 1 of 11 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. CUT OFF 170 FT OF CABLE. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) MAKE UP SWIVEL AND BALL CATCHER J Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr)_ (u_sft)_ 2/10/2019 09:00 - 11:00 2.00 CASING P 13,925.00 RUNPRD REMOVE BAKER UQC, PREP TO PUMP SLACK OUT. LAUNCH 7/8" DRIFTAND PUMP ITAROUND. 09:30 - FILL WELL WITH 2 BBLS, AFTER REEL VOLUME+ 10 BBLS CHECK CUT BACK 10' OF CT TO REMOVE FLAT SPOT NOZZLE, BALL NOT THERE. _ P INSTALL NEW CT CONNECTOR. RUNPRD MAKEUP NOZZLE AGAIN. RUNPRD PULL TEST TO 50K, GOOD. PRESSURE UP AGAIN AND SURGE, BALL IS PRESSURE TEST TO 4,500 PSI, GOOD. HEARD ROLLING. FILL WELL EVERY 30 MIN WITH ABOUT 2.5 BBLS 11:00 - 13:00 2.00 CASING P 13,925.00 RUNPRD M/U 1 JT OF PHe. PUMP EXCESS CABLE SLACK FORWARD OUT 13:00 - 14:30 1 1.50 1 CASING 1430 - 1500 0.50 CASING 15:00 - 16:30 1.50 CASING 16:30 - 19:30 3.00 CASING 1930 - 2000 0.50 CASING P OF THE REEL. RUNPRD CUT OFF 170 FT OF CABLE. MAKE UP SWIVEL AND BALL CATCHER J NOZZLE TO CT, MAKE UP RISER TO WELL. P 13,925.00 RUNPRD PJSM AND REVIEW PROCEDURE FOR CORRECTLY. DROPPING BALL. - DISCUSSED 3.0" HAND SLIPS / DOG COLLAR LAUNCH 7/8" DRIFTAND PUMP ITAROUND. AFTER REEL VOLUME+ 10 BBLS CHECK NOZZLE, BALL NOT THERE. _ P 13,925.00 RUNPRD MAKEUP NOZZLE AGAIN. RUNPRD LINER PRESSURE UP AGAIN AND SURGE, BALL IS HEARD ROLLING. AFTER REEL VOLUME+ 10 BBLS LIFT OFF _ _ INJECTOR, RECOVER BALL. P 1 13,925.00 RUNPRD PREP RIG FLOOR FOR MAKE UP LINER. RIG UP TONGS, INSPECT DIES AND BACKUPS. CREW DEPLOYED SAFETY JOINT IN 6:30 MIN VERIFY XO FOR SAFETY JOINT. RIG UP SAFETY JOINT. DISCUSSION AROUND MAKEUP OF 3-3/16" VERIFY PIPE COUNT WITH DRILLER, TP, WSL AND BTT REP. TCIICROSSOVER. RIG UP HOLE FILL LINE. CONDUCT PJSM AND REVIEW PROCEDURE FOR RUNNING LINER. P 13,925.00 RUNPRD M/U LINER AS PER APPROVED SUMMARY. - PICK UP 2-7/8" SHOE TRACK -MAKE UP FIRST FIVE JOINTS FILLING EVERY JOINT PER NABORS PROCEDURE. - FILLING EVERY 20 AFTER THIS -JOINT 281N HOLE. HAND SLIPS NOT BITING. REPLACE DIES 1930 - 2000 0.50 CASING P 13,925.00 RUNPRD KICK WHILE TRIPPING DRILL - DISCUSSED HAVING A BACK UP PLAN IF EQUIPMENT IN USE DOES NOT WORK CORRECTLY. - DISCUSSED 3.0" HAND SLIPS / DOG COLLAR COULD BE USED IN PLACE TO DEPLOY SAFETY JOINT. 20:00 - 00.00 4.00 CASING P 13,925.00 RUNPRD LINER - MAKE UP FINAL 50 JOINTS OF 3-1/4" LINER -MAKEUP 3-1/4"X 10'PUP JOINT. FIL_LPIPE_ 2/11/2019 00:00 - 00:30 0.50 CASING P 13,925.00 RUNPRD CREWCHANGE KICK WHILE TRIPPING DRILL CREW DEPLOYED SAFETY JOINT IN 6:30 MIN DISCUSSION AROUND MAKEUP OF 3-3/16" TCIICROSSOVER. Printed 3/1112019 10:44:20AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 2 or 11 Operation Summary Report Common Well Name: 03-32 A-E No Event Type: COM- ONSHORE (CON) Start Date. 2/10/2019 End Date: 2/15/2019 X3 -0198Y -C'. (482,803.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USA00001395 Active datum: KB (§?57.79us8 (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description or Operations (hr)(us@) . _--- — - 00:30. - 02:30 2.00 CASING P 13,825.00 RUNPRD MAKE UP 3-1/2"ST-LX 3 -3/18"X -OVER Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths" BOT CTLRT. PICKUP 6 JOINTS OF 2-318" BTS -6 FILL PIPE 0230 - 0430 200 CASING P 13,925.00 RUNPRD RUN LINER ON COIL - PRESSURE TEST OTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 02:30 - MUD WEIGHT: 8.83 PPG IN, 9.73 PPG OUT - RATE: 0.17 BPM IN, 0.41 BPM OUT. CIRC PRESSURE: 1500 PSI - MUD LOSSES WHILE RIH: 15 BPH - STOP AT WHITE FLAG 12813.81'-12777= -36.81' CORRECTION. CORRECT DEPTH TO 12777' - PU WEIGHT AT 30 FPM AT 60K 0430 - 07.00 2.50 CASING P 13,925.00 RUNPRD RIH TO ABOVE WINDOW - CIRCULATE 9.8 PPG OUT - 0.95 BPM IN / 0.68 BPM OUT - 8.81 PPG IN / 9.79 PPG OUT ! CIRC PRESSURE 1964 PSI SLOWLY RAISE PUMP RATE AS PRESSURE Ili ALLOWS. 07.00 - 08.30 1.50 CASING N 13,925.00 RUNPRD PHASE 3 CALLED, CIRCULATE AT WINDOW. HOLD 200 PSI WHP WHILE CIRCULATING, • _ _ LOSSES 10 - 12 BBL/HR. 08.30 - 0930 1.00 CASING P ! 13,925.00 RUNPRD BACKTO PHASE 2, WT CHECK 58KTHEN RIH. PUMP 0.4 BPM. RIH, SET DOWN AT 13265'. PICKUPANDTRYAND WORKTHROUGH. ABLE TO WORK PAST, START WORKING LINER TO BOTTOM. MIX SPACERS FOR LVT. CONDUCT PJSM FOR PUMPING LVT. _L HAVE WORKED_ DOWN TO 13317'. 0930 - 14:00 4.50 CASING P ! 13,925.00 RUNPRD START 10 BELS SPACER + 20 BBLS LVT + 10 BBLS SPACER DOWN CT. PUMP 2 BBLS OUT AND WORK DOWN TO 13329' ! LET SOAK 5 MIN, CYCLE PIPE NO LUCK. PUMP 3 MORE BBLS OUT, LET SOAK CONTINUE PUMPING OUT 2-5 BBLS AT A TIME LET SIT FOR VARYING LENGTHS OF TIME. RIH WITH NO PUMP WORKING BEST, WORK DOWNTO13402'. CAN'T WORK PAST THIS SPOT TRY 10+ TIMES. PUMP REMINING LVT OUT, PICK UP 50' AND RIH, SAME SPOT. 1400 - 16.30 2.50 CASING P 13,925.00 RUNPRD RIH TO 13400'AND PUMP THE LVT TO SURFACE. KEEP 270 PSI WHP WHILE CIRCULATING OUT. TRY WORKING PIPE WHILE CIRCULATING LVT OUT, LOSING GROUND. - 16.30 - 1800 1.50 CASING P 13,925.00 RUNPRD MIX UP 15 BBLS BEADED SPACER, 20 BBLS LVT, 15 BBLS BEADED SPACER. INCREASE LUBES FROM 2.25% TO 3%. Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 3 of 11 Common Well Name: 03-32 - 05:45 2.75 AFE No Event Type: COM- ONSHORE (CON) Start Date 2/10/2019 End Date: 2/15/2019 X3 -0198Y -C'. (482,803.00 ) Project: PBU Site: 03 06:20 - 07:20 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. - 0740 0.33 BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) UNTIL 9.8 PPG ARRIVES Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) DIFFERENTIAL PRESSURE AT RUNNING TOOL (usft) CONSTANTAT 2300# SURFACE PRESSURE 18:00 - 20:15 2.25 CASING P 13,925.00 RUNPRD PUMP BEADED SPACER OUT. 20.15 - 21.30 1.25 CASING N 21:30 - 00:00 2.50 CASING N 2/12/2019 00:00 - 03:00 3.00 CASING N 03:00 - 05:45 2.75 CASING N 05:45 - 06:20 0.56 CASING N 06:20 - 07:20 1.00 CASING N 0720 - 0740 0.33 CASING N 07:40 - 12:00 4.33 CASING N Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths" - MAKE ATTEMPT. MAKE NO HEAD WAY. - PUMP 5 BBLS LVT OUT SHOE AND MAKE ATTEMPT WITH PUMPS OFF - LET SOAK FOR 10 MIN. -ATTEMPT AT SAME SPOT - PUMP 5 BBLS ADDITIONAL OUT. TRIED MULTIPLE TIMES AFTER 30 MIN SOAK. - CIRCULATE 15 BBLS OF BEADED SPACER OUT AT 2.4 BPM @ 2366#. -MAKE MULTIPLE ATTEMPT. PUANDRUNAT IT. LOSE GROUND BACK TO 13386' 13,925.00 _ RUNPRD CIRCULATE SPACERS/ LVT OUT OF WELL - 2.25 BPM IN / 2.11 BPM OUT '- BRING BACK INSIDE. - TRY ONE LAST TIME. NO LUCK. DISCUSS ,WITH ODE. PULL LINER TO WINDOW '- VERY RATTY PULLING TO WINDOW. AS SOON AS SHOE CAME THROUGH WINDOW. _ WEIGHTS SMOOTHED OUT _ 13,925.00 RUNPRD CONTINUE TO CIRCULATE WITH 6.6 PPG UNTIL 9.8 PPG ARRIVES 13,925.00 RUNPRD CIRCULATE 9.8 PPG IN - FOLLOW PRESSURE SCHEDULE TO KEEP DIFFERENTIAL PRESSURE AT RUNNING TOOL CONSTANTAT 2300# SURFACE PRESSURE - 1.88 BPM IN 11.48 BPM OUT -9.83 PPG IN /9.70 PPG OUT. - PERFORM DYNAMIC FLOW CHECK 0.49 BPM N/ 0.21 OUT - RE -PAINTED WHITE WINDOW FLAG (10067' EDP) _ 13,925.00 RUNPRD POOH -1.98 BPM IN / 114 BPM OUT -9.85 PPG IN /9.74 PPG OUT - CIRC PRESSURE: 2112 PSI W/ 50 PSI ON CHOKE LOSING 22-24 BPH PULLING OUT OF HOLE. 13,925.00 RUNPRD AT SURFACE, CIRC 18 BELS (B/U FROM SHOE)AROUND. SHUT DOWN FOR FLOW CHECK, FLOW DIMINISHED TO DROPS AFTER 20 MIN, PJSM FOR UD BHA WHILE FLOW CHECKING. 13,925.00 RUNPRD OPEN CT RISERAND INSPECT LAST50' OF CT FOR FLAT SPOTS, NOTHING SEEN. UD 6 JTS OF PH6 AND SELRT. 13,925.00 RUNPRD CONDUCT 01 DRILL WITH WARD CREW. RUN SELRT TOOL DOWN INTO PIPE SHED, PUT SAFETY JOINT ON SKATE AND BRING TO FLOOR. TORQUE UP XO AND SAFETY JOINT TO LINER, RUN IT IN FOR PROPER SPACEOUT. DRILLER CLOSES IN WELL CORRECT CLOSING ORDER (SIMULATED), CREWS GO TO STATIONS. TOTAL TIME TO SHUT IN WELL, 4 MIN. CON_DUCTAAR. 13,925.00 RUNPRD UD 3-1/4" LINER. FILL WELL EVERY 15 JTS. WELL IS TAKING ABOUT 2 BBL/HR MORE THAN PIPE DISPLACEMENT. Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths" Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths— North America - ALASKA - BP Page 4 of 11 Operation Summary Report Common Well Name: 03-32 AFE No Event Type: COM- ONSHORE (CON) Start Date'. 2/10/2019 End Date: 2/15/2019 X3 -0198Y -C'. (482,803.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00 OOAM Rig Release: Rig Contractor NABORSALASKA DRILLING INC. BPUOI USA00001395 Active datum: KB @57.79usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) (usf) _ 1200 - 1230 0.50 CASING P 13,925.00 RUNPRD FUNCTION TEST BOPS, GOOD. 1230 - 1930 7.00 CASING P 13,925.00 RUNPRD OFFLOAD 3-1/4"LINER. START LOADING PIPE SHED WITH 2-7/8" LINER. STRAP AND DRIFT LINER. FILL WELL WITH 2 BELS EVERY 30 MIN. DECISION IS MADE TO RUN A 2-318" BENT PUP WITH BULLNOSE ON AN INDEXING TOOL. REQUESTED 38 BBLS PUMPABLE CEMENT FROM SLB AT 16:15. 1930 - 0000 4.50 CASING P 13,925.00 RUNPRD RECEIVED APPROVED TALLY PJSM WITH CREW. VERIFIED PIPE COUNT MAKE UP SHOE TRACK. MAKEUP 61 JOINTS OF 2-7/8" 13CR-85 LINER 2/13/2019 00:00 - 02:00 2.00 CASING P 13,925.00 RUNPRD . LINER MAKE UP - MAKE UP REMAINING 16 JOINTS OF 2-718" 13Cr-85 LINER - MAKE UP XO, 20' PUP, CTLRT AND 7/8" BALL HIGHLOAD DISCONNECT, XO - MAKE UP 5 JOINTS OF 2-3/8" BTS -6 02:00 - 04:00 2.00 CASING P 13,925.00 RUNPRD RUN LINER ON COIL - PRESSURE TEST QTS TO 250 PSI LOW FOR S MINUTES 13500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 01:45 - LOAD EP MUD LUBE PILL/ 8.7 PPG MUD WHILE RUNNING IN HOLE - MUD WEIGHT: 8.73 PPG IN, 9.78 PPG OUT - RATE: 0.31 BPM IN, 0.49 BPM OUT. CIRC PRESSURE: 900 PSI - MUD LOSSES WHILE RIH: 29.3 BBLS - STOP AT WHITE FLAG 12699.12- 12658.92 = - 40' CORRECTION. _ RIH TO JUSTABOVE WINDOWAT 12865' 04.00 - 0630 _ 2.50 CASING P 13,925.00 RUNPRD CIRCULATE 9.8 PPG FLUID OUT - LEAD WITH 25 BBL EP MUD LUBE PILL - CHASE WITH 8.7 PPG SYSTEM - START INCREASING WHP AS 8.7 MUD COMES UPANNULUS. - SEND EP LUBE RIALTO TIGER TANK WHEN IT GETS TO SURFACE. 06:30 - 08:00 1.50 CASING P 13,925.00 RUNPRD BRING RETURNS INSIDE AND DROP RATE. PICKUP WT IS 571<. START RIH WITH LINER. KEEP 150 PSI WHP WHILE WORKING LINER TO BOTTOM. CLEAN PASS TO 13403, TAG. PICK UPAND WORK INDEXING MECHANISM. INDEX 12 TIMES, NOTABLE TO PASS. SIT ON BOTTOMAND PUMP MAX RATE 2.32 BPM 12370 PSI FOR 20 MIN. PICK UPAND INDEX 2 MORE TIMES, MAKE IT TO 13410'. SIT HERE AND CIRCULATE THEN START TO Printed 3/11/2019 10:44:20AM **All depths reported in Drillers Depths— North America - ALASKA - BP Operation Summary Report Common Well Name. 03-32 Event Type: COM- ONSHORE (CON) Start Date: 2/10/2019 End Date: 2/15/2019 Project: PBU Site: 03 AFE No X3 -0198Y -C: (482.803.00 ) Page 5 of 11 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB Q57.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 08:00 - 09:30 1.50 CASING P 13,925.00 RUNPRD TAG 13913', SOLID TAG. PICK UP TRY TO WORK DEEPER, TAG 3 TIMES HERE. CONSIDER THIS BOTTOM. DO 3 PICKUPS AT 0.3 BPM 130 FT/MIN AND I VERIFY BREAKOVER: 13897', 13896', 13896' WITH 68-70K EACH TIME. TRY TO WORK PIPE DOWN NOT ABLE TO i PASS 13913'. _ 09.30 - 1100 1 50 CASING P 13,925.00 RUNPRD CONDUCT PJSM AND REVIEW PROCEDURE FOR BALL DROP. DROP 5/8" ALUMINUM BALL AND LAUNCH AS PER NABORS PROCEDURE. BALL IS NOT HEARD ROLLING. 'SLOW DOWN PUMP RATE AT 40 BELS AWAY. .AFTER 60 BBLS AWAY BALL ISN'T SEEN. SURGE AGAIN WITH 3000 PSI. PICKUPCTTO 50KAND BACK DOWN AGAIN. CYCLE PUMP UPAND DOWN. GO TO MIN RATEAND PICK UP AND BACK DOWN. BALL GOES ON SEAT, SHEARS AT 4200 PSI. 11:00 - 1200 1.00 CASING P 13,925.00 RUNPRD CIRC KCLAROUND. AFTER 54 BBLS IN FLOW OUT STARTS TO DIVERGE FROM FLOW IN. `SHUT IN WELL, PURGE OUT MM WITH AIR THEN FLOWCHECK. OUT FLOW SLOWLY DIMINISHING, SIMILAR TO PREVIOUS ONES. TOTAL FLOWED BACK 20 MIN IS 2.1 BBLS. DISCUSS WITH WSUPAND ODE, AGREE TO HOLD WHP WHILE CIRCULATING KCL AROUND. 12:00 - 13:40 1.67 CASING P 13,925.00 RUNPRD CIRCULATE KCL ALL THE WAY AROUND. 350 PSI WHIP TO KEEP 1:1 RETURNS. AFTER KCL ALL THE WAY BACK SURFACE SLOWLY BLEED OFF WHIP. 13:40 - 15:30 1.83 CEMT P 13,925.00 RUNPRD SLB CEMENT CREWARRIVES. SPOT UNITS AND GET RIGGED UP. GO TO WIDE OPEN CHOKE AND SHUT DOWN PUMP FOR FLOW CHECK. FLOWBACK RATE IS SLOWLY DIMINISHING. AFTER 3 BBLS FLOW BACK IN 10 MIN SHUT IN, WHP LEVELS OUT DISCUSS PLAN FORWARD WITH WSUP AND SR WSL. AGREE TO CONDUCT 1 BBL BLEEDS THEN MONITOR PRESSURE BUILDUP EACH TIME, SHOWING DOWNWARD TREND. OPEN CHOKE AND BLEED REMAINING OFF. BLEEDING OFF SLOWLY. RESUME CIRCULATING 1 BPM. Printed 3/11/2019 10:44:20AM "'All depths reported in Drillers Depths" Printed 3/11/2019 10:44:20AM ••All depths reported in Drillers Depths" North America - ALASKA- BP Page 6 of 11 Operation Summary Report Common Well Name. 03-32 AFE No Event Type: COM- ONSHORE (CON) Start Dale: 2/10/2019 End Date. 2/15/2019 X3-0198Y-C. (482,803.00 ) Project: PBU Site: 03 Rig Name/No.: CDR-2 Spud DataTme: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 15:30 - 20:00 4.50 CEMT P 13,925.00 RUNPRD PJSM WITH SLB AND NABORS CREW FOR- PUMPING CEMENT. BATCH UP CEMENTAND SEND CEMENT VAN KCL WATER FOR PT. WSLAND PUMP OPERATOR REVIEW PRESSURE XCHECK VERIFICATION, AND WITNESS LOW PRESSURE TRIP AT 300 PSI. PT CEMENT LINE 7O 250/4700 PSI, GOOD. PUMP 26.7 BBLS CEMENT INTO CT THEN SHUTDOWN. FOAMY OUT MM NOT READING. SEND RETURNS OUTSIDE. NO LEL READINGS. SHUT DOWN PUMP AND SHUT IN, SEND EXHAUST FLUID TO CEMENT VAN. DISCUSS WITH WSUP AND WOM, AGREE TO CARRY ON WITH CEMENT JOB OUT TO TT, RELY ON OUT MM FOR CEMENT DISPLACEMENTS. CONTINUE DISPLACEMENT, ZERO OUT MM 'WHEN CEMENT AT SHOE. RETURNS STEADY OUT IN A COUPLE 'MINUTES. WITH 3 BBLS LEFT IN CT, SHUT DOWN AND 'PICK UP 12 FT. RIH LAND 10 FT HIGHER. ROLL PUMP TO PUSH PEE-WEE DART INTO LWP. PICK UPAND SIDE EXHAUST 3 BBLS CMT +3 BBLS EXHAUST. - STACK BACK DOWN 10KAND LAUNCH LWP WITH 3900 PSI, BUMP PLUG AT 13.9 BBLS. TOTAL OF 23.9 BBLS BEHIND PIPE BASED ON I D ALL 10 BBLS EXHAUST. PURGE RISER OUT TO TIGER TANKAND BRING RETURNS BACK INSIDE. PUMP ALL REMAINING EXHAUSTAND FOLLOW WITH 8.6 PPG MUD NOTE: LOSSES WHILE PUMPING EXHAUST AND MUD 6-20 BPH-DISCUSS WITH ODE. NOTE:-30 BBLS CEMENT CONTAMINATED RETURNS Printed 3/11/2019 10:44:20AM ••All depths reported in Drillers Depths" Common Well Name: 03-32 Event Type: COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Page 7 of 11 Operation Summary Report Start Date: 2/102019 End Date: 2/15/2019 Site: 03 Spud Date(Time: 8/24/1984 12:00:OOAM AFE No Rig Release: (482,803.00 ) Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) lush) 20:00 - 23:00 3.00 CEMT P 13,925.00 RUNPRD POOH WITH 10 BBLS OF 6.6 PPG MUD AT BHA POOH SWAP TO PUMPING KCLAT 10100 FEET. WITH COIL STATIONARYAT 10066 START TO • INCREASE CHOKE PRESSURE TO MAINTIAN 1 TO 1 RETURNS -DISCUSS WITH ODE AND WSUP. POOH INCREASING CHOKE PRESSURE TO MAINTIAIN CORRECT HOLE FILL. AT 9200' REDUCE PUMP RATE TO 1 BBL PER MINUTE TO MAINTIAIN MUD IN COIL FOR TRIP IOOH I DISCUSS BLEEDING PRESSURE OFF AT SURFACE/FINGER PRINTING WITH ODE AND WSUP NOTE: REPAINT EOP WINDOW FLAG AT 10066 NOTE: RETURNS CORRECT HOLDING 270 PSI 2300 - 2345 0.75 CEMT P 13,925.00 RUNPRD FLOW CHECK/FINGER PRINT AT 300' BLEED OFF i BBL OF FLUID AND SHUT IN -PRESSURE BLEED TO ZERO IN 0.5 BBLS BUT FLOW CONTINUED. AT 5 MINUTES OF SHUT IN PRESSURE READ -30 PSI. BLEED OFF I BBL OF FLUIDAND SHUT IN -PRESSURE BLEED TO ZERO IN. 25 BBLS BUT FLOW CONTINUED AT 5 MINUTES STILL ZERO PRESSURE. BLEED OFF AN ADDITONAL 0.25 BBLS AND FLOW STOPS. MONITOR FOR FLOWAT SHAKERS FOR 5 MINUTES NO FLOW, FILL RISER AND MONITOR FOR FLOW AT PUMP IN SUB ON RISER FOR 5 MINUTES_ NO 0 FLOW. 23:45 - 00:00 0.25 CEMT P 13,925.00 RUNPRD LAY DOWN CEMENTING BHA BREAK INJECTOR OFF AT 2345 HOURS. INSPECT 50' OF COILABOVE BHA -GOOD 2/14/2019 00:00 - 00:45 0.75 CEMT P 13,925.00 RUNPRD LAY DOWN CEMENTING BHA WHILE BREAKING COIL SWIVEL OBSERVE SMALL FLOW FROM TOP OF RISER. MAKE UP SWIVEL MAKE UP INJECTOR RIH WITH COIL TO POSITION BHA BELOW BOPS AND TEST OTS TO 3500 PSI. CHECK FOR FLOW THROUGH LUBRICATOR BLEEDER, TWO 500 ML TEST SHOW INCREASING FLOW. DISCUSS STATUS WITH WSUPAND WOMAND AGREE TO PLAN FORWARD. Printed 3/11/2019 10:44:20AM `•All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 11 Common Well Name: 03-32 AFE No Event Type: COM- ONSHORE (CON) Start Date'. 2/10/2019 Eno Date. 2/15/2019 X3 -0198Y -C. (482,803.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Daterrme: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB Q57.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (Usft) 00:45 - 07:00 8.25 CEMT P 13,925.00 RUNPRD _ MONITOR WELL AFTER 30 MINUTES CHOKE PRESSURE INCREASED TO 16 PSI. PUMP 0.50 BELS TO INCREASE WELLHEAD PRESSURE TO 58 PSI AT 0130 HRS. MONITOR PRESSURE. AT 0330 HRS WELLHEAD PRESSURE AT 52 PSI -STABLE DROP OF 1 PSI EVERY 20 MINUTES. BLEED OFF 0.5 BBLS TO ZERO PRESSURE AND NO FLOW SHUT IN FOR 10 MINUTES ZERO PRESSURE BUILD UP OPEN BLEEDER ON LUBRICATOR STILL HAVE FLOW- MONITOR FLOW IN 5 GALLON INCREMENTS WITH TIMESAS FOLLOWS; 8 MINUTES, 24 MINUTES, 30 MINUTES DISCUSS RESULTS WITH WSUPAND AGREE TO PROCEED WITH LAYING DOWN LINER RUNNING BHA. AT 0600 VEHICLEACCIDENT ON ROAD LEADING TO RIG, ROAD IS TEMPORARILY CLOSED. DISCUSS WITH SECURITY DISPATCH WHEN EMS VEHICLES WILL BE ALLOWED TO THE 'RIG IF NEEDED. 07:00 - 0730 0.50 CEMT P 13,925.00 RUNPRD FLOWBACK RATE SHOWING A DECREASING TREND. ROAD TO RIG IS REOPENED TO SINGLE LANE TRAFFIC. UD BTS -6 AND LINER RUNNING TOOL, RECOVER 5/8" ALUMINUM BALL. 07:30 - 08:30 1.00 CASING P 13,925.00 RUNPRD MAKE UP NOZZLE AND GET ON WELL, CIRC CT OVER TO MUD, VERIFY BALL SEATS AND OD OF LOGGING _ _'_ _ TOOLS. _ 08:30 - 1000 1.50 CASING N 13,925.00 RUNPRD PJSM FOR M/U LOGGING BHA. MAKE UP LOGGING BHAAS PER OCN #5. INJECTOR ON 10:00. TEST_ OTS TO 3500 PSI, GOOD. 10:00 - 12:30 2.50 CASING N 13,925.00 RUNPRD RIH. PUMP 0.3 BPM /980 PSI WHILE RIH. 12:30 - 13:30 1.00 CASING N 13,925.00 RUNPRD STOP AT 10500'FOR S MIN. LOG DOWN FROM 10500' TO TAG AT 30 FT/MIN. LIGHTTAGAT 11640', UNCORRECTED. PICK UPAND REPEAT, SAME DEPTH. STAY HERE FOR 5 MIN THEN PICK UP TO _ FLAG DEPTH. 13:30 - 14:45 1.25 CASING IN 13,925.00 RUNPRD LOG UP AT 30 FT/MIN. PUMP 2.5 BPM STOP AT 11300' NOZZLE DEPTH AND PAINT ORANGE FLAG. CONTINUE LOGGING UP TO 10500'. 14:45 - 16:50 2.08 CASING N 13,925.00 RUNPRD POOH FROM 10500'. PUMP 2.45 BPM. 16:50 - 18:00 1.17 CASING N 13,925.00 RUNPRD NEAR SURFACE, FLOW CHECK. FINGERPRINT, FLOW DIMINISHING SLOWLY SIMILAR TO OTHERS. HOLD PJSM WITH CREW FOR LAYING DOWN LOGGING BHA Printed 3/11/2019 10:44:2OAM **All depths reported in Drillers Depths`" Printed 3/11/2019 10*44:20AM `•AII depths reported in Drillers Depths' North America - ALASKA - BP Page 9 of 11 Operation Summary Report Common Well Name: 03-32 AFE No Event Type. COM- ONSHORE (CON) Start Date: 2/10/2018 End Date. 2/15/2019 X3 -0198Y -O. (482,803.00 ) Project PBU Site: 03 Rig Name(No.: CDR -2 Spud Daterrime: 8/24/1984 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: K8 @57.79usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:00 - 19:30 1.50 CASING N 13,925.00 RUNPRD LAY DOWN LOGGING BHA PREP FOR RUNNING GUNS WHILE WAITING TO VERIFY GOOD DATA ON LOGGING RUN,, WALK GUNS WITH HES ENGINEER, AGREE WITH LAYOUT 1930 - 2000 0.50 PERF P 13,925.00 OTHCMP PJSM TO MU GUNS AND RUNNING BHA DISCUSS FOLLOWING OUR PROCEDURES WELL CONTROL -MAKE SURE WE HAVE THE PROPER CROSSOVERS CALCULATED DRY GUN WEIGHT IS NOT GOING TO EXCEED THE PERF GUN ELEVATORS EXCLUSION ZONES WORKING UNDER SUSPENDED LOADS TAKING OUR TIME AND NOT TO GET INA HURRY NOTE: SUBMITTED 24 HR AOGCC NOTICE FOR BOP TEST FOR 2030 HRS ON 15TH OF FEBRUARY-RCVD REPLY FROM JEFF JONES. 2000 - 20.45 0.75 PERF P 13,925.00 OTHCMP MU THE PERF BHAAS PER MEMO PROGRAM FIRING HEAD FOR 7 -HRS AT 2030 HRS WILLACTIVATEAT 0330 20:45 - 21:00 0.25 PERF P 1 13,925.00 OTHCMP ALLGUNS RAN LD PERF GUN ELEVATORSAND MU THE _ RUNNING TOOLS WITH THE RIG ELEVATORS 21'.00 - 22:00 1.00 PERF P 13,925.00 OTHCMP MAKE UP PERF GUN RUNNING BHA. NOTE: MARKER PUP RAN BETWEEN JOINTS 10 AND 11 OF 1 1/4"CSH _ 2200 - 2230 0.50 PERF P 13,925.00 OTHCMP HOLD KICK WHILE TRIPPING DRILL WITH RICK ROY'S CREW TOLD DRILLER WE HAD FLOW OVER THE RISER WITH PIPE IN SLIPS ADDED COMPLICATION OF THE ACCUMULATOR PRESSURE NOT BUILDING BACK UP AFTER FUNCTIONING RAM AND RAM NOT CLOSING. HELD AAR WITH CREW TIME TO SHUT IN (SIMULATED) 3 MINUTES 40 SECONDS. REFER TO E WELLS Assessment Id 138888 FOR MORE INFORMATION. 22:30 - 00:00 _ 1.50 PERF P 13,925.00 OTHCMP MAKE UP PERF GUN RUNNING BHA. NOTE: BREAK CIRCULATION AT JOINT 40 OF 1 1/4" CSH _ 2/15/2019 10000 - 0200 2.00 PERF P 13,925.00 OTHCMP MAKE UP PERF GUN RUNNING BHA. MAKE UP INJECTOR TO BHAAND TEST OTS TO 3500 PSI -GOOD 02:00 - 08:00 4.00 PERF P 13,925.00 OTHCMP TAG UP ZERO DEPTH AND RIH AT 80 FPM GET WEIGHTS PRIOR TO ENTERING LINER 45K UP WT/ 21K DOWN WT AT 11384' AT 11384' REDUCE SPEED TO 30 FPM. STOPAT FLAG, CORRECT -7 FT TO CORRECTED LOG FLAG DEPTH. TAG AT 13918', TALLY PBTD IS 13904'. Printed 3/11/2019 10*44:20AM `•AII depths reported in Drillers Depths' Common Well Name: 03-32 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Page 10 of 11 Operation Summary Report Start Date: 2/10/2019 End Date: 2/15/2019 AFE No X3-019BY-C. (482,803 00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79us8 (above Mean Sea Level) Date From - To Him (hr) 06:00 - 07:00 1.00 07:00 - 08:40 1.67 08:40 - 1000 1.33 10:00 - 14:00 4.00 14:00 - 15:15 1.25 Task Code NPT Total Depth Phase Description of Operations . lust)_ .. _ PERF P 13,925.00 OTHCMP REVIEW HES LOG THAT WAS DONE ON THE PREVIOUS RUN. RECALCULATE CORRECTED FLAG DEPTH BASED ON ZEROING TOOLAT THE END OF THE BHA TO MAKE IT CONSISTENT WITH RIG PRACTICE. PULL BACK TO FLAG DEPTH AND CORRECT TO 13755'. RIH TAG AT 13912' VS TALLY DEPTH OF i r 13904'. CORRECT DEPTH TO THE TALLY PBTD. PERF P 13,925.00 OTHCMP PICKUP PAST SHOT DEPTH AND ACTIVATE FIRING HEAD WITH MOVEMENTS. KEEP 100 - 150 PSI WHIP ON DURING ALL MOVEMENTS. MOVE DOWN TO SHOT DEPTH 13805' (PUTS BOTTOM SHOT AT 13804') IST ATTEMPT WITH DOWN MOVEMENTS 30 ' FT/MIN, 0.3 BPM, NO INDICATION. 2ND TRY UP MOVEMENTS 30 FT/MIN, 0.3 BPM, NO INDICATION. 3RD TRY 0 PUMP, UP MOVEMENTS 30 FT/MIN, NO INDICATION PERF P 13,925.00 OTHCMP CREW CHANGE, REVIEW FIRING HEAD OPERATION AND SHOT DEPTH WITH ONCOMING DRILLER. 4TH TRY UP MOVEMENTS AT 50 FT/MIN, 0.4 BPM, NO INDICATION 5TH TRY UP MOVEMENTS 40 FT/MIN, 0 PUMP, NO INDICATION PERF P 13,925.00 OTHCMP DISCUSS RESULTS WITH ODEAND SR WSL (ALSO ACTING WSUP). DECISION IS MADE TO POOH AND REVIEW DATA FROM FIRING HEAD. USE SWABBING PRECAUTIONS FOR POOH IN CASE GUNS HAVE FIRED. KEEP 250 PSI WHP INSIDE LINER, SPEED <50 FT/MIN. PULLABOVE LINER TOP AND FLOWCHECK GOOD. GOES TO ZERO OUT RATE IN 19 MIN. CONTINUE POOH. AT 10500' OUT MM SHOWS LIGHT RETURNS, AROUND 8.2 PPG. STOP PIPE AND PUMP, FLOW CHECKAT THE RIG FLOOR. FLOW CHECK IS GOOD, NO FLOW. PURGE OUT MM WITH AIR. TAKE SOME RETURNS OUT TO TIGER TANK RETURNS CLEAN UP RIGHT AWAY. BRING RETURNS INSIDE, CONTINUE POOH. PERF P 13,925.00 OTHCMP STOPAT 100 FT FOR FLOW CHECK. FLOW CHECK IS GOOD, GOES TO ZERO ON OUT MM IN 15 MIN. CHECKAT RIG FLOOR, NO FLOW. CONDUCT PJSM FOR UD CSH WHILE WATCHING WELL. OPEN RISER AND INSPECT LAST 50' OF CT, NOTHING SEEN. WHILE RISER IS OPEN, OBSERVE SOME SLIGHT FLOW COMING UPTHE RISER. CLOSE RISERAND FLOW CHECKAGAIN, FLOW IS DIMINISHING BUT SURGING SLIGHTLY. Printed 3111/2019 10:44:20AM —All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 11 of 11 Common Well Name: 03-32 AFE No Event Type: COM- ONSHORE (CON) Start Date: 2/102019 End Date' 2/15/2019 X3 -0198Y -C. (482,803.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB ID57.79usft (above Mean Sea Level) Date From - To Hrs Task Cade NPT Total Depth Phase Description of Operations _ (hr). _ _.. _. _ (usft) 15:15 - 15:50 0.58 PERF P 13,925.00 OTHCMP _ CLOSE RISER AND RIH 500', PUMP OUT TO TIGER TANK. OUT DENSITY IS STEADY. GET BACK TO SURFACE AND PUMP 1 B/U _ FROM CIRC PORT DEPTH. 15:50 - 21:00 5.17 PERF P 13,925.00 OTHCMP FLOW CHECK AT SURFACE. ESTABLISH DIMINISHING TREND AFTER 30 MIN. OPEN RISER. UD 2 JTS BTS -6 AND 1-1/4" HYDRIL. 21:00 - 00:00 3.00 PERF P 13,925.00 OTHCMP LAY DOWN GUNS -HOLD PRE JOB SAFETY MEETING WITH CREW 2 JOINTS PRIOR TO BEING AT THE BOPS WITH THE FIRING HEAD. .i -PULL FIRING HEAD AND TOP GUN CONFIRM TOP SHOT FIRED. -HOLD PRE JOB SAFETY MEETING FOR LAYING DOWN GUNS -LAY DOWN PERF GUNS AND RIG DOWN AND CLEAN RIG FLOOR. "END OF 03-321311 AT MIDNIGHT" NEXT REPORT WILL BE 03-32BL2 Printed 3/112019 10:44:20AM • All depths reported in Drillers Depths" RECEIVED MAR 2 2 2019 AOGCC 0 by North America - ALASKA - BP PBU 03 03-32 03-32BL1 500292114160 Design: 03-32BL1 Final Survey Report 22 March, 2019 ae 5 Company: North America - ALASKA- BP Project: PBU Site: 03 Well: 03-32 Wellbore: 03-32BL1 Design: 03-32BL1 BP Final Survey Report Local Co-0rdinate Reference: Well 03-32 TVD Reference: KB @ 57.79usft(03-32B) MD Reference: KB @ 57.79usft (03-32B) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site 03, TR -10-15 Site Position: Northing: 5,939,219.130 usft Latitude: 70° 14' 13.210 N From: Map Easting: 712,287.910 usft Longitude: 148° 17'8.774 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.61 ° Well 03-32, 03-32 Well Position +N/ -S 0.00 usft Northing: 5,936,394.630 usft Latitude: 70' 13'44.941 N +E/ -W 0.00 usft Easting: 714,086.010 usft Longitude: 148° 16' 18.663 W Position Uncertainty 0.00 usft Wellhead Elevation: 28.98 usft Ground Level: 27.80 usft Wellbore 03-328L1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°) (°I uT) BGGM2018 2/1/2019 17.11 80.92 57,429 Design 03-32BL1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 12,861.33 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (1) 28.81 0.00 0.00 26934 3222019 2:33: 53AM Page 2 COMPASS 5000.1 Build 81D M BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 2/14/2019 From To (waft) (waft) Survey (Wellbore) Tool Name Description 60.89 5,198.39 03-32 Srvy 1 GCT MS (03-32) GCT -MS Schlumberger GCT multishot 5,206.00 5,448.49 03-32B Srvy 1 Inc+Trend (03-32B) INC+TREND Indinometer+ known azi trend 5,544.62 10,835.15 03-32B Srvy 2 MWD+IFR+MS (03-32B) MWD+IFR+MS-WOCA MWD- IFR+Multi Station W/O Crustal 10,905.84 11,447.3503-32B Srvy3 MWD+IFR+MS(03-32B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 11,460.11 12,861.33 03-32B Srvy 4 MWD+IFR+MS (03-32B) MWD+IFR+MS-WOCA MIND + IFR +Multi Station W/O Crustal 12,887.00 13,92500 Survey #1 (03-32BL1) MWD MWD -Standard Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg (usft) V) (') (usft) (waft) (waft) (usft) (usft) (waft) (°1100usft) 28.81 0.00 0.00 28.81 -28.98 0.00 0.00 5,936,394.630 714,086.010 0.00 60.89 0.00 165.25 60.89 3.10 0.00 0.00 5,936,394.630 714,086.010 0.00 73.89 0.02 253.31 73.89 16.10 0.00 0.00 5,936,394.629 714,086.008 0.15 86.99 0.03 276.14 86.99 29.20 0.00 -0.01 5,936,394.629 714,086.002 0.11 100.79 0.03 290.48 100.79 43.00 0.00 -0.01 5,938,394.630 714,085.995 0.05 114.49 0.02 306.31 114.49 56.70 0.00 -0.02 5,938,394.633 714,085.990 0.09 128.19 0.03 315.44 128.19 70.40 0.01 -0.02 5,936,394.637 714,085.985 0.08 141.99 0.05 316.76 141.99 84.20 0.01 -0.03 5,936,394.643 714,085.978 0.15 155.69 0.07 315.93 155.69 97.90 0.02 -0.04 5,936,394.653 714,085.968 0.15 169.39 0.08 311.31 169.39 111.60 0.04 -0.05 5,936,394.665 714,085.955 0.09 183.29 0.10 303.33 183.29 125.50 0.05 -0.07 5,936,394.678 714,085.937 0.17 197.09 0.12 297.86 197.09 139.30 0.06 -0.09 5,936,394.691 714,085.914 0.16 210.99 0.15 293.79 210.99 153.20 0.08 -0.12 5,936,394.704 714,085.884 0.23 224.79 0.17 291.50 224.79 167.00 0.09 -0.16 5,936,394.718 714,085.848 0.15 238.69 0.17 289.47 238.69 180.90 0.11 -0.20 5,936,394.731 714,085.809 0.04 252.49 0.17 288.50 252.49 194.70 0.12 -0.24 5,936,394.743 714,085.770 0.02 266.39 0.18 287.43 266.39 208.60 0.13 -0.28 5,936,394.755 714,085.729 0.08 280.19 0.18 287.51 280.19 222.40 0.15 -0.32 5,936,394.767 714,085.687 0.00 V. Sec (usft) 0.00 0.00 0.00 0.01 0.01 0.02 0.02 0.03 0.04 005 0.07 0.09 0.12 0.16 0.20 0.24 0.28 0.32 3/222019 2:33.53AM Page 3 COMPASS 5000.1 Build 81D by Company: North America- ALASKA - BP Project: PBU Site: 03 Well: 03-32 Wellbore: 03-32BL1 Design: 03-32BL1 Survey MD (usft) 294.09 307.89 321.79 335.69 349.59 363.39 377.29 391.09 404.89 418.69 432.49 446.29 480.19 474.09 487.89 501.79 515.69 529.49 543.39 557.29 571.19 585.19 598.79 612.39 626.29 640.29 654.19 Inc 1°) 0.18 0.18 0.18 0.18 0.18 0.18 0.20 0.20 0.18 0.20 0.25 0.28 0.30 0.32 0.33 0.32 0.32 0.30 0.32 0.32 0.28 0.27 0.27 0.27 0.28 0.28 0.28 BP Final Survey Report 3/2272019 2:33:53AM Page 4 COMPASS 5000.1 Build 810 Local Coordinate Reference: Well 03-32 TVD Reference: KB @ 57.79usft (03-32B) MD Reference: KB @ 57.79usft (03-32B) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 AN TVD TIDSS NIS ENy Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 287.72 294.09 236.30 0.16 -0.36 5,936,394.779 714,085.645 000 0.36 287.97 307.89 250.10 0.17 -0.40 5,936,394.791 714,085.604 0.01 0.40 288.71 321.79 264.00 0.19 -0.44 5,936,394.804 714,085.562 0.02 0.44 287.91 335.69 277.90 0.20 -0.48 5,936,394.816 714,085.520 0.02 0.48 287.33 349.59 291.80 0.21 -0.53 5,936,394.828 714,085.478 0.01 0.52 288.39 363.39 305.60 0.23 -0.57 5,936,394.840 714,085.437 0.02 0.56 289.27 377.29 319.50 0.24 -0.61 5,936,394.854 714,085.393 0.15 0.61 290.13 391.09 333.30 0.26 -0.66 5,936,394.869 714,085.347 0.02 0.65 290.86 404.89 347.10 0.27 -0.70 5,936,394.884 714,085.303 0.15 0.70 290.78 418.69 360.90 0.29 -0.74 5,936,394.899 714,085.260 0.14 0.74 291.13 432.49 374.70 0.31 -0.79 5,936,394.917 714,085.209 0.36 0.79 291.04 446.29 388.50 0.33 -0.85 5,936,394.936 714,085.149 0.22 085 290.56 460.19 402.40 0.36 -0.92 5,936,394.961 714,085.083 0.14 0.91 290.59 474.09 416.30 0.38 -0.99 5,936,394.986 714,085.011 0.14 0.98 290.54 487.89 430.10 0.41 -1.06 5,936,395.011 714,084.937 0.07 1.06 290.10 501.79 444.00 0.44 -1.14 5,936,395.036 714,084.863 0.07 1.13 290.22 515.69 457.90 0.47 -1.21 5,936,395.061 714,084.789 0.00 1.20 290.56 529.49 47170 0.49 -1.28 5,936,395.085 714,084.718 0.15 1.27 290.76 543.39 485.60 0.52 -1.35 5,936,395.109 714,084.647 0.14 1.34 291.21 557.29 499.50 0.55 -1.42 5,936,395.135 714,084.574 0.02 141 292.09 571.19 513.40 0.57 -1.49 5,936,395.160 714,084.506 0.29 148 292.91 585.19 527.40 0.60 -1.55 5,936,395.184 714,084.443 0.08 1.54 293.08 598.79 541.00 0.62 -1.61 5,936,395.207 714,064.383 0.01 1.60 293.19 612.39 554.60 0.65 -1.67 5,936,395.231 714,084.324 0.00 1.66 293.20 626.29 568.50 0.67 -1.73 5,936,395.255 714,084.262 0.07 1.72 292.94 640.29 582.50 0.70 -1.79 5,936,395.280 714,084.198 0.01 178 292.43 654.19 596.40 0.73 -1.86 5,936,395.305 714,084.134 0.02 1.85 3/2272019 2:33:53AM Page 4 COMPASS 5000.1 Build 810 BP Final Survey Report Company: Norm America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: Pau TVD Reference: KB @ 57.79usft (03-32B) Site: 03 MD Reference: KS @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc An TVD TVDSS NIS E/W Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100ueft) 667.99 0.23 291.97 667.99 610.20 0.75 -1.91 5,936,395.326 714,084.077 0.36 681.79 0.20 292.67 681.79 624.00 0.77 -1.96 5,936,395.345 714,084.029 0.22 695.59 0.20 292.06 695.59 637.80 0.79 -2.01 5,936,395.362 714,083.983 0.02 709.49 0.18 290.74 709.49 651.70 0.81 -2.05 5,936,395.377 714,083.940 0.15 723.39 0.17 290.82 723.39 665.60 0.82 -2.09 5,936,395.391 714,083.900 0.07 737.29 0.17 290.59 737.29 679.50 0.84 -2.13 5,936,395.405 714,083.861 0.00 751.09 0.17 290.23 751.09 693.30 0.85 -2.16 5,936,395.418 714,083.822 0.01 764.99 0.15 289.66 764.99 707.20 0.86 -2.20 5,936,395.430 714,083.785 0.14 778.89 0.10 287.74 778.89 721.10 0.87 -2.23 5,936,395.439 714,083.756 0.36 792.79 0.07 285.37 792.79 735.00 0.88 -2.25 5,936,395.445 714,083.737 0.22 806.59 0.05 282.79 806.59 748.80 0.88 -2.26 5,936,395.448 714,083.722 0.15 820.39 0.02 271.23 820.39 762.60 0.88 -2.27 5,936,395.449 714,083.714 0.22 834.29 0.00 248.70 - 834.29 776.50 0.88 -2.27 5,938,395449 714,083.712 0.14 848.09 0.00 227.37 848.09 790.30 0.88 -2.27 5,936,395449 714,083.712 0.00 861.99 0.00 180.44 861.99 804.20 0.88 -2.27 5,936,395.449 714,063.712 0.00 875.79 0.00 130.73 875.79 818.00 0.88 -2.27 5,936,395.449 714,083.712 0.00 889.59 0.00 104.17 889.59 831.80 088 -2.27 5,936,395.449 714,083.712 0.00 903.49 0.00 84.43 903.49 845.70 0.88 -2.27 5,936,395.449 714,083.712 0.00 917.39 0.02 73.56 917.39 859.60 0.88 -2.27 5,936,395.450 714,083.714 0.14 931.09 0.02 56.01 931.09 873.30 0.89 -2.27 5,936,395.452 714,083.718 0.04 944.89 0.02 37.78 944.89 887.10 0.89 -2.26 5,936,395.455 714,063.722 0.05 958.59 0.03 39.45 958.59 900.80 0.89 -2.26 5,936,395.460 714,083.725 0.07 972.29 0.07 55.57 972.29 914.50 0.90 -2.25 5,936,395.468 714,083.734 0.31 986.19 0.10 67.97 986.19 928.40 0.91 -2.23 5,936,395.477 714,083.752 0.25 999.99 0.13 75.66 999.99 942.20 0.92 -2.21 5,936,395.487 714,083.778 0.24 1,013.79 0.15 81.42 1,013.79 956.00 0.93 -2.17 5,936,395.494 714,083.811 0.18 1,027.59 0.18 87.10 1,027.58 969.79 0.93 -2.13 5,936,395.499 714,083.851 0.25 V. Sec (usft) 1 90 1.95 2.00 2.04 2.08 2.12 2.15 2.19 2.22 2.24 2.25 2.26 2.26 2.26 2.26 2.26 2.26 2.26 2.26 2.26 2.25 225 2.24 2.22 2.20 2.16 212 3*212019 2..33:53AM Page 5 COMPASS 5000.1 Build BID A BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57 79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BLI Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc An TVD TVDSS NIS E/W Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 1,041.49 0.18 92.62 1,041.48 983.69 0.93 -2.09 5,936,395.500 714,083894 0.12 1,055.29 0.18 97.55 1,055.28 997.49 0.93 -2.05 5,936,395.498 714,083.937 0.11 1,069.09 0.20 101.82 1,089.08 1,011.29 0.92 -2.00 5,936,395.491 714,083.983 0.18 1,082.89 0.20 104.55 1,082.88 1,025.09 0.91 -1.96 5,936,395.482 714,084.030 0.07 1,096.69 0.17 107.49 1,096.68 1,038.89 0.90 -1.91 5,936,395471 714,084.073 0.23 1,110.49 0.15 113.68 1,110.48 1,052.69 0.88 -1.88 5,936,395.458 714,084.109 0.19 1,124.29 0.15 120.42 1,124.28 1,066.49 0.87 -1.84 5,936,395.443 714,084.142 0.13 1,138.09 0.17 127.65 1,138.08 1,080.29 0.84 -1.81 5,936,395.422 714,084.174 0.21 1,151.89 0.18 136.26 1,151.88 1,094.09 0.82 -1.78 5,936,395.395 714,084.206 0.20 1,165.69 0.23 143.42 1,165.68 1,107.89 0.78 -1.75 5,935,395.358 714,084.239 0.41 1,179.49 0.30 150.68 1,179.48 1,121.69 0.72 -1.72 5,936,395.305 714,084.275 0.56 1,193.29 0.37 157.44 1,193.28 1,135.49 0.65 -1.68 5,936,395.233 714,084.311 0.58 1,206.99 0.42 162.57 1,206.98 1,149.19 0.56 -1.65 5,936,395.146 714,084.346 0.45 1,220.69 0.47 166.34 1,220.68 1,162.89 0.46 -1.62 5,936,395.044 714,084.377 0.42 1,234.39 0.50 169.76 1,234.38 1,176.59 0.35 -1.60 5,936,394.931 714,084.404 0.30 1,248.19 0.52 173.16 1,248.18 1,190.39 0.23 -1.58 5,936,394.810 714,084.426 0.26 1,26189 0.52 176.62 1,261.98 1,204.19 0.10 -1.57 5,936,394.686 714,084441 0.23 1,275.79 0.52 178.78 1,275.78 1,217.99 -0.02 -1.56 5,936,394.561 714,084.449 0.14 1,289.59 0.52 180.04 1,289.58 1,231.79 -0.15 -1.56 5,936,394436 714,084.454 0.08 1,303.39 0.50 181.72 1,303.38 1,245.59 -0.27 -1,56 5,936,394.313 714,084.456 0.18 1,317.19 0.50 183.21 1,317.18 1,259.39 -0.39 -1.57 5,936,394.193 714,084.454 0.09 1,330.89 048 184.50 1,330.88 1,273.09 -0.51 -1.58 5,936,394.076 714,084.449 0.17 1,344.69 0.47 185.90 1,344.68 1,286.89 -0.82 -1.59 5,936,393.962 714,084.442 0.11 1,358.49 0.48 187.01 1,358.48 1,300.69 -0.74 -1.60 5,936,393.848 714,084.433 0.10 1,372.29 0.48 188.05 1,372.28 1,314.49 -0.85 -1.61 5,936,393.733 714,084.421 0.06 1,385.99 0.50 189.30 1,385.98 1,328.19 -0.97 -1.63 5,936,393.616 714,084.406 0.17 1,399.89 0.53 190.82 1,399.88 1,342.09 -1.09 -1.65 5,936,393.493 714,084.388 0.24 V. Sec (usft) 2.08 2.04 1.99 1.94 1.90 1.87 1.83 1.80 1.77 1.74 1.71 167 1.64 1 62 1.59 1.58 1.57 1,56 1.56 1.57 1.57 1.58 1.59 1.61 1.62 1.64 1.67 3/22/2019 2:33:53AM Page 6 COMPASS 5000.1 Build BID „ger IJI) `�Hea BP Final Survey Report Company: North America -ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: KB Q 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32811 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) 1413.59 0.60 192.18 1,413.58 1,355.79 -1.22 -1.68 5,936,393.360 714,084.365 0.52 1,427.39 0.65 192.18 1,427.37 1,369.58 -1.37 -1.71 5,936,393.212 714,084.337 0.36 1,441.19 0.70 191.52 1,441.17 1,383.38 -1.53 -1.75 5,936,393.052 714,084.308 0.37 1,454.99 0.72 191.77 1,454.97 1,397.18 -1.70 -1.78 5,936,392.883 714,084.278 0.15 1,468.59 0.75 192.43 1,468.57 1,410.78 -1.87 -1.82 5,936,392.712 714,084.247 0.23 1,481.99 0.77 192.88 1,481.97 1,424.18 -2.04 -1.86 5,936,392.537 714,084.213 0.16 1,495.19 0.77 193.44 1,495.17 1,437.38 -2.21 -1.90 5,936,392.364 714,084.177 0.06 1,508.29 0.78 193.50 1,508.27 1,450.48 -2.39 -1.94 5,936,392.190 714,084.141 0.08 1,521.19 0.78 193.31 1,521.17 1,463.38 -2.56 -1.98 5,936,392.018 714,084.105 D.02 1,534.19 0.80 193.49 1,534.17 1,476.38 -2.73 -2.02 5,936,391.843 714,084.068 0.16 1,547.19 0.78 193.47 1,547.16 1,489.37 -2.91 -2.06 5,936,391.667 714,084.032 0.15 1,560.39 0.77 193.67 1,560.36 1,502.57 -3.08 -2.10 5,936,391.493 714,083.995 0.08 1,573.79 0.77 194.17 1,57376 1,515.97 -3.25 -2.15 5,936,391.317 714,083.956 0.05 1,587.39 0.77 194.29 1,587.36 1,529.57 -3.43 -2.19 5,936,391.138 714,083.816 0.01 1,600.89 0.77 194.84 1,600.86 1,543.07 -3.61 -2.24 5,936,390962 714,083.876 0.05 1,614.39 0.77 195.35 1,614.36 1,556.57 -3.78 -2.28 5,936,390.785 714,083.834 0.05 1,627.89 0.77 195.15 1,627.86 1,570.07 -3.96 -2.33 5,936,390.609 714,083.791 0.02 1,641.39 0.75 195.27 1,641.36 1,583.57 4.13 -2.38 5,936,390.435 714,083.749 0.15 1,654.89 0.73 195.92 1,654.85 1,597.06 4.30 -2.43 5,936,390.266 714,083.707 0.16 1,668.29 0.72 196.45 1,668.25 1,610.46 -4.46 -2.47 5,936,390.102 714,083.664 0.09 1,681.69 0.72 196.88 1,681.65 1,623.86 -4.62 -2.52 5,936,389.939 714,083.620 0.04 1,695.09 0.70 197.42 1,695.05 1,637.26 -4.78 -2.57 5,936,389.779 714,083.576 0.16 1,708.59 0.70 197.86 1,708.55 1,650.76 4.94 -2.62 5,936,389.620 714,083.531 0.04 1,722.09 0.68 198.42 1,722.05 1,664.26 -5.09 -2.67 5,936,389.465 714,083.484 0.16 1,735.59 0.68 199.09 1,735.55 1,677.76 -5.24 -2.72 5,936,389.311 714,083.437 0.06 1,749.09 0.68 199.45 1,749.05 1,691.26 -5.39 -2.78 5,936,389.159 714,083.389 0.03 1,762.59 0.67 200.48 1,762.55 1,704.76 -5.54 -2.83 5,936,389.008 714,083.339 0.12 V. Sec (usft) 1 69 1 73 1 76 1 80 1 84 1 88 1 92 1 97 2.01 2.05 2.10 2.14 2.18 2.23 2.28 2.33 2.38 2,43 248 2.53 2.58 2.63 2.68 2.73 2.78 284 2.89 3/22/2019 2:33:53AM Page 7 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-32 Project: PBU ND Reference: KB @ 57.79usft (03-328) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E(W Northing Eas0ng DLeg (usft) (°) (°) (usft) (usft) (usft) (waft) (usft) (usft) (°I100usft) 1,776.09 0.65 201.90 1,776.05 1,718.26 -5.69 -2.89 5,936,388.861 714,083.287 0.19 1789.59 0.63 202.30 1,789.55 1,731.76 -5.83 -2.94 5,936,388.720 714,083.234 0.15 1,802.99 0.62 202.23 1,802.94 1,745.15 -5.96 -3.00 5,936,388.583 714,083.182 0.07 1,816.49 0.62 202.86 1,816.44 1,758.65 -6.10 -3.05 5,936,388.447 714,083.130 0.03 1,829.99 0.62 202.50 1,829.94 1,772.15 -6.23 -3.11 5,936,388.310 714,083.078 0.01 1,843.49 0.60 201.94 1,843.44 1,785.65 -6.37 -3.16 5,936,388.176 714,083.028 0.15 1,856.89 0.60 202.16 1,856.84 1,799.05 -6.50 -3.22 5,936,388.044 714,082.979 0.02 1,870.39 0.60 201.56 1,870.34 1,812.55 -6.63 -3.27 5,936,387.912 714,082.930 0.04 1,883.89 0.58 200.56 1,883.84 1,826.05 -6.76 -3.32 5,936,387.781 714,082.883 0.17 1,897.39 0.57 200.02 1,897.34 1,839.55 -6.89 -3.37 5,936,387.652 714,082.840 0.08 1,910.79 0.52 199.34 1,910.74 1,852.95 -7.01 -3.41 5,936,387.531 714,082.800 0.38 1,924.19 0.45 198.61 1,924.14 1,866.35 -7.11 -3.45 5,936,387.423 714,082.766 0.52 1,937.59 0.37 198.44 1,937.54 1,879.75 -7.20 -3.48 5,936,387.331 714,082.739 0.60 1,950.99 0.27 196.71 1,950.94 1,893.15 -7.27 -3.50 5,936.367.259 714,082.718 0.75 1,964.49 0.15 193.68 1,964.44 1,906.65 -7.32 -3.51 5,936,387.211 714,082.706 0.89 1,977.99 0.10 180.11 1,977.94 1,920.15 -7.35 -3.52 5,936,387.182 714,082.702 0.43 1,991.39 0.12 156.61 1,991.34 1,933.55 -7.38 -3.51 5,936,387.158 714,082.709 0.36 2,004.89 0.17 137.62 2,004.84 1,947.05 -7.40 -3.49 5,936,387.131 714,082.729 0.51 2,018.39 0.25 125.41 2,018.34 1,960.55 -7.44 -3.46 5,936,387.100 714,082.767 0.68 2,031.89 0.33 117.77 2,031.84 1,974.05 -7.47 -3.40 5,936,387.066 714,082.826 0.66 2,045.29 0.40 112.61 2,045.24 1,987.45 -7.51 -3.32 5,936,387.033 714,082.905 0.56 2,058.79 0.38 107.25 2,058.74 2,000.95 -7.54 -3.23 5,936,387.004 714,082.992 0.31 2,072.29 0.33 96.70 2,072.24 2,014.45 -7.56 -3.15 5,936,386.988 714,083.074 0.61 2,085.79 0.35 83.40 2,085.74 2,027.95 -7.56 -3.07 5,936,386.991 714,083.153 0.60 2,089.29 0.40 74.31 2,099.24 2,041.45 -7.54 -2.99 5,936,387.011 714,083.239 0.57 2,112.49 0.45 68.83 2,112.44 2,054.65 -7.51 -2.89 5,936,387.044 714,083.331 0.49 2,125.89 0.52 64.41 2,125.83 2,068.04 -7.46 -2.79 5,936,387.093 714,083.433 0.59 V. See (usft) 2.95 3.01 3.07 3.12 3.18 3.24 329 3.35 3.40 3.45 3.49 3.53 3.56 3.58 3.60 3.60 3.60 3.58 3.54 3.48 3.41 3.32 3.24 3.16 3.07 2.98 2.88 3/222019 2..33.53AM Page 8 COMPASS 5000.1 Build BID BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU ND Reference: KB ,@ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi TVD NDSS NIS E/W Northing Easting DLe9 (usft) (°) (°) (usft) (usft) (waft) (usft) (usft) (usft) (°/t00usft) 2,139.29 0.58 59.90 2,139.23 2,081.44 -7.40 -2.68 5,936,387.156 714,083.545 0.55 2,152.69 0.63 54.29 2,152.63 2,094.84 -7.32 -2.56 5,936,387.236 714,083.661 0.58 2,166.19 0.68 49.19 2,166.13 2,106.34 -7.23 -2.44 5,936,387.335 714,083.779 0.57 2,179.69 0.75 44.92 2,179.63 2,121.84 -7.11 -2.31 5,936,387.454 714,083.899 0.65 2,193.19 0.80 40.21 2,193.13 2,135.34 -6.98 -2.19 5,936,387.592 714,084.019 0.60 2,206.69 0.85 35.78 2,206.63 2,148.84 -6.83 -2.07 5,938,387.748 714,084.134 0.60 2,220.09 0.88 30.45 2,220.03 2,16224 -6.66 -1.96 5,936,387.921 714,084.239 0.64 2,233.59 0.87 23.59 2,233.53 2,175.74 -6.47 -1.87 5,936,388.107 714,084.327 0.78 2,247.09 0.87 18.51 2,247.02 2,189.23 -6.28 -1.79 5,936,388.300 714,084.395 0.57 2,260.59 0.88 15.00 2,260.52 2,202.73 -6.08 -1.73 5,936,388.499 714,084.449 0.40 2,273.99 0.90 11.84 2,273.92 2,216.13 -5.88 AA9 5,936,388.702 714,084.492 0.40 2,287.49 0.88 9.83 2,287.42 2,229.63 -5 fib -1.65 5,936,388.909 714,084.525 0.27 2,300.99 0.87 7.89 2,300.92 2,243.13 -5.47 -1.61 5,936,389.114 714,084.551 0.23 2,314.39 0.85 6.56 2,314.32 2,256.53 -5.27 -1.59 5,936,389.314 714,084.571 0.21 2,327.89 0.83 7.55 2,327.81 2,270.02 -5.08 -1.57 5,936,369.511 714,084.589 0.18 2,341.29 0.82 7.18 2,341.21 2,283.42 4.89 -1.54 5,936,389.703 714,084.609 0.08 2,354.69 0.80 5.06 2,354.61 2,296.82 4.70 -1.52 5,936,389.892 714,084.624 0.27 2,368.09 0.75 4.08 2,368.01 2,310.22 4.52 -1.51 5,936,390.073 714,084.633 0.39 2,381.49 0.68 1.84 2,381.41 2,323.62 4.35 -1.50 5,936,390.240 714,084.637 0.56 2,394.89 0.62 359.82 2,394.81 2,337.02 4.20 -1.49 5,936,390.392 714,084.635 0.45 2,408.29 0.60 358.57 2,408.21 2,350.42 4.06 -1.50 5,936,390.534 714,084.629 0.18 2,421.69 0.60 356.94 2,421.61 2,363.82 -3.91 -1.50 5,936,390.674 714,084.620 0.13 2,434.99 0.58 355.50 2,434.91 2,377.12 -3.78 -1.51 5,936,390.810 714,084.607 0.19 2,448.09 0.55 354.92 2,448.01 2,390.22 -3.65 -1.52 5,936,390.939 714,084.592 0.23 2,461.29 0.48 355.09 2,461.21 2,403.42 -3.53 -1.53 5,936,391.057 714,084.579 0.53 2,474.49 0.43 355.58 2,474.41 2,416.62 -3.43 -1.54 5,936,391.161 714,084.567 0.38 2,487.69 0.38 356.25 2,487.60 2,429.81 -3.33 -1.55 5,936,391.254 714,084.558 0.38 V. Sec (usft) 2.76 264 2.52 240 2.27 2.15 2.04 1 94 1 87 1 80 1 75 1.71 1 68 1.65 1.62 1.60 1.57 1.56 1.55 1.54 1.54 1.55 1 55 1 56 1.57 1.58 1 59 3222019 2:33: 53AM Page 9 COMPASS 5000.1 Build BID NE BP Final Survey Report Company: North America -ALASKA -BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft(03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL7 Database: EDM R5K - Alaska PROD - ANCPt Survey MD Inc Azi TVD TVDSS NIS E/W Northing Eisting DLeg (usft) (°) (•) (usft) (usft) (usft) (usft) (usft) (usft) (•MOOusN) 2,500.69 0.27 358.18 2,500.80 2,443.01 -3.26 -1.55 5,936,391.328 714,084.552 0.84 2,513.99 0.17 3.09 2,513.90 2,456.11 -3.21 -1.55 5,936,391.379 714,084.550 0.78 2,527.19 0.17 13.61 2,527.10 2,469.31 -3.17 -1.55 5,936,391.417 714,084.555 0.24 2,540.39 0.27 26.80 2,540.30 2,482.51 -3.12 -1.53 5,936,391.465 714,084.572 0.84 2,553.49 0.33 35.99 2,553.40 2,495.61 -3.07 -1.49 5,936,391.524 714,084.607 0.59 2,566.59 0.37 43.95 2,566.50 2,508.71 -3.00 -1.44 5,936,391.586 714,084.656 0.48 2,579.69 0.42 50.24 2,579.60 2,521.81 -2.94 -1.37 5,936,391.649 714,084.721 0.50 2,592.89 0.52 52.26 2,592.80 2,535.01 -2.88 -1.29 5,936,391.719 714,084.804 0.77 2,606.09 0.62 52.48 2,606.00 2,548.21 -2.80 -1.18 5,936,391.802 714,084.905 0.76 2,619.29 0.67 54.65 2,619.20 2,561.41 -2.71 -1.07 5,936,391.894 714,085.022 0.42 2,632.49 0.70 58.73 2,632.40 2,574.61 -2.62 -0.93 5,936,391.984 714,085.152 OA3 2,645.69 0.72 60.87 2,645.60 2,587.81 -2.54 -0.79 5,936,392.070 714,085.291 0.25 2,658.89 0.70 57.91 2,658.80 2,601.01 -2.46 -0.65 5,938,392.157 714,085.429 0.32 2,672.09 0.70 44.03 2,672.00 2,614.21 435 -0.53 5,936,392.262 714,085.550 1.28 2,685.19 0.80 26.46 2,685.10 2,627.31 -2.22 -0.43 5,938,392.404 714,085.643 1.90 2,698.39 0.97 18.85 2,698.30 2,640.51 -2.03 -0.35 5,936,392.594 714,085.715 1.56 2,711.59 1.13 16.43 2,711.49 2,653.70 -1.80 -0.28 5,936,392.826 714,085.781 1.26 2,724.79 1.38 10.96 2,724.69 2,666.90 -1.52 -0.21 5,936,393.109 714,085.840 2.10 2,737.99 1.80 4.99 2,737.88 2,680.09 -1.15 -0.16 5,936,393.473 714,085.878 3.42 2,751.19 2.35 0.66 2,751.08 2,693.29 -0.68 -0.14 5,936,393.950 714,085.886 4.32 2,764.39 3.08 356.99 2,764.26 2,706.47 -0.05 -0.16 5,936,394.574 714,085.854 5.70 2,777.49 4.05 353.56 2,777.34 2,719.55 0.76 -0.23 5,936,395.383 714,085.761 7.58 2,790.69 5.13 351.64 2,790.49 2,732.70 1.81 -0.37 5,936,396A26 714,085.593 8.26 2,803.79 6.15 351.04 2,803.53 2,745.74 3.08 -0.56 5,936,397.693 714,085.363 7.80 2,816.89 7.17 351.58 2,816.54 2,758.75 4.58 -0.79 5,936,399.187 714,085.091 7.80 2,829.79 8.38 353.12 2,829.32 2,771.53 6.31 -1.02 5,936,400.910 714,084.812 9.52 2,842.99 9.72 355.00 2,842.36 2,784.57 8.38 -1.23 5,936,402.968 714,084.541 10.39 V. Sec (usft) 1.59 1.59 1.58 1.56 1.53 1.47 1.41 1.32 1.22 1.10 0.96 0.82 0.68 0.55 0.46 0.38 0.30 0.23 0.18 0.15 0.16 0.22 0.34 0.52 0.74 0.95 1.14 3222019 2:33:53AM Page 10 COMPASS 5000.1 Build 81D am BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-32 Project: PBU ND Reference: KB @ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi TVD TVDSS NIS EMI Northing Easgng DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) 2,856.19 10.82 356.70 2,855.35 2,797,56 10.72 -1.40 5,936,405.309 714,064.306 8.84 2,869.39 11.57 357.99 2,868.29 2,810.50 13.28 -1.52 5,936,407,864 714,084.115 5.99 2,884.39 12.17 359.05 2,682.97 2,825.18 16.37 -1.60 5,936,410.945 714,083.949 4.26 2,902.99 12.75 0.02 2,901.14 2,843.35 20.38 -1.63 5,936,414.955 714,083.803 3.31 2,933.29 13.53 1.11 2,930.64 2,872.85 27.27 -1.56 5,936,421.841 714,083.678 2.70 2,964.99 14.17 1.77 2,961.42 2,903.63 34.85 -1.37 5,936,429.429 714,083.654 2.08 2,996.69 14.55 1.98 2,992.13 2,934.34 42.71 -1.11 5,936,437.291 714,083.688 1.21 3,028.39 14.82 2.08 3,022.79 2,965.00 50.74 -0.83 5,936,445.326 714,083.745 0.86 3,060.09 15.05 2.59 3,053.42 2,995.63 58.91 -0.49 5,936,453.495 714,083.846 0.84 3,091.69 15.08 4.71 3,083.94 3,026.15 67.10 0.03 5,936,461.701 714,084.136 1.75 3,123.29 15.08 8.18 3,114.45 3,056.66 75.27 0.95 5,936,469.890 714,084.827 2.86 3,154.89 15.38 11.10 3,144.94 3,087.15 83.45 2.34 5,936,478.107 714,085.985 2.61 3,186.49 16.02 12.95 3,175.36 3,117.57 91.81 4.13 5,936,488.615 714,087.531 2.57 3,218.49 16.68 13.96 3,206.07 3,148.28 100.57 6.23 5,9363495.331 714,089.379 2.25 3,250.09 17.13 14.47 3,236.30 3,178.51 109.48 8.48 5,936,504.298 714,091.382 1.50 3,281.99 17.47 15.59 3,266.76 3,208.97 118.64 10.94 5,936,513.525 714,093.582 149 3,313.09 18.08 19.56 3,296.38 3,238.59 127.68 13.81 5,936,522.646 714,096.194 4.36 3,344.39 18.93 25.42 3,326.06 3,268.27 136.85 17.62 5,936,531.913 714,099.738 8.53 3,375.59 19.43 29.28 3,355.53 3,297.74 145.94 22.33 5,936,541.141 714,104.189 4.37 3,406.89 19.20 30.49 3,385.07 3,327.28 154.92 27.49 5,936,550.259 714,109.089 1.47 3,438.09 18.67 30.18 3,414.58 3,356.79 163.66 32.60 5,936,559.138 714,113.953 1.73 3,469.29 18.95 27.74 3,444.11 3,386.32 172.46 37.47 5,936,568.073 714,118.569 2.68 3,500.59 20.00 23.90 3,473.62 3,415.83 181.85 42.00 5,936,577.590 714,122.835 5.29 3,531.79 20.82 21.77 3,502.86 3,445.07 191.88 46.22 5,936,587.733 714,126.767 3.55 3,563.09 21.33 21.35 3,532.07 3,474.28 202.35 50.36 5,936,598.313 714,130.603 1.70 3,594.29 21.75 21.36 3,561.09 3,503.30 213.01 54.53 5,936,609.095 714,134.472 1.35 3,625.49 22.12 21.45 3,590.03 3,532.24 223.86 58.79 5,936,620.061 714,138.418 1.19 V. Sac (usft) 1.28 1.36 1.41 1 39 1.24 0.96 062 0.24 -0.19 -0.81 -1.83 -3.31 -5.19 -7.39 -9.75 -12.32 -15.29 -19.20 -24.02 -29.28 -34.50 -39.47 44.11 -48.44 -52.70 -57.00 -61.38 3/222019 2:33:53AM Page 11 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft(03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-3213) Well: 03-32 North Reference: True Wellbore: 03-32131-1 Survey Calculation Method; Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD NDS$ N/S Vill Northing Easting DLeg V. See (usft) (") (') (usft) (usft) (usft) (usft) (waft) (usft) (°AOOusft) (usft) 3,656.69 22.50 21.40 3,618.90 3,561.11 234.89 63.11 5,936,631.204 714,142.429 1.22 -65.83 3,687.99 23.03 21.28 3,647.76 3,589.97 246.17 67.52 5,936,642.605 714,146.514 1.70 -70.37 3,718.99 23.77 21.27 3,676.21 3,618.42 257.64 71.99 5,936,654.200 714,150.654 2.39 -74.97 3,750.09 25.10 21.60 3,704.52 3,646.73 269.62 76.69 5,936,666.302 714,155.014 4.30 -79.81 3,781.09 26.58 22.01 3,732.42 3,674.63 282.16 81.71 5,936,678.983 714,159.676 4.81 -84.98 3,812.09 27.53 22.38 3,760.03 3,702.24 295.22 87.04 5,936,692.183 714,164.630 3.11 -90.45 3,843.49 28.20 22.64 3,787.79 3,730.00 308.77 92.66 5,936,705.894 714,169.862 2.17 -96.23 3,874.89 28.50 22.68 3,815.42 3,757.63 322.53 98.40 5,936,719.810 714,175.213 0.96 -102.13 3,906.19 28.52 22.54 3,842.93 3,785.14 335.32 104.14 5,936,733.759 714,180.563 0.22 -108.04 3,937.49 28.50 22.38 3,870.43 3,812.64 350.13 109.85 5,936,747.721 714,185.876 0.25 -113.90 3,968.79 28.45 22.39 3,897.95 3,840.16 363.93 115.54 5,936,761.675 714,191.165 0.16 -119.75 4,000.19 28.43 22.38 3,925.56 3,867.77 377.76 121.23 5,938,775.657 714,196.465 0.07 -125.60 4,031.19 28.47 22.28 3,952.81 3,895.02 391.42 126.84 5,936,789.471 714,201.686 0.20 -131.37 4,062.39 28.47 22.26 3,980.24 3,922.45 405.18 132.48 5,936,803.388 714,206.929 0.03 -137.16 4,093.69 28.45 22.29 4,007.76 3,949.97 418.98 138.13 5,936,817.345 714,212.188 0.08 -142.98 4,124.99 28.43 22.33 4,035.28 3,977.49 432.77 143.79 5,936,831.290 714,217.453 0.09 A48.80 4,156.09 28.45 22.41 4,062.63 4,004.84 446.47 149.43 5,936,845.140 714,222.699 0.14 -154.59 4,186.69 28.43 22.47 4,089.53 4,031.74 459.94 154.99 5,936,858.762 714,227.877 0.11 -160.31 4,217.19 28.32 22.42 4,116.37 4,058.58 473.34 160.52 5,936,872.309 714,233.028 0.37 -166.00 4,247.39 28.25 22.31 4,142.96 4,085.17 486.57 165.97 5,936,885.692 714,238.095 0.29 -171.60 4,277.89 28.22 22.16 4,169.83 4,112.04 499.93 171.43 5,936,899.197 714,243.174 0.25 -177.21 4,308.59 28.25 22,04 4,196.88 4,139.09 513.38 176.89 5,936,912.803 714,248.254 0.21 -182.83 4,339.39 28.38 21.94 4,224.00 4,166.21 526.93 182.36 5,936,926.498 714,253.337 0.45 -168.46 4,370.09 28.57 21.81 4,250.98 4,193.19 540.51 187.82 5,936,940.230 714,258.403 0.65 -194.07 4,400.89 28.60 21.74 4,278.03 4,220.24 554.20 193.28 5,936,954.064 714,263.479 0.15 -199.69 4,431.69 28.55 21.98 4,305.08 4,247.29 567.87 198.77 5,936,967.886 714,268.573 0.41 -205.34 4,462.49 28.58 22.54 4,332.13 4,274.34 581.50 204.35 5,936,981.668 714,273.763 0.87 -211.07 3!222019 2:33:53AM Page 12 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°NOOusft) (usft) 4,493.29 28.60 22.89 4,359.17 4,301.38 595.10 210.04 5,936,995,419 714,279.066 0.55 -216.92 4,524.09 28.58 22.87 4,386.22 4,328.43 608.68 215.77 5,937,009.155 714,284.408 0.07 -222.81 4,554.99 28.62 22.75 4413.34 4,355.55 622.31 221.50 5,937,022.946 714,289.753 0.23 -228.70 4,585.79 28.70 22.65 4,440.37 4,382.58 635.94 227.20 5,937,036.730 714,295.065 0.30 -234.56 4,616.59 28.87 22.65 4,467.37 4,409.58 649.63 232.92 5,937,050.573 714,300.385 0.55 -24043 4,647.49 29.02 22.58 4,494.41 4,436.62 663.43 238.67 5,937,064.534 714,305.741 0.50 -246.34 4,678.29 28.98 22.36 4,521.34 4,463.55 677.23 244.37 5,937,078.489 714,311.054 0.37 -252.21 4,709.09 28.93 22.24 4,548.29 4,490.50 691.02 250.03 5,937,092.439 714,316.318 0.25 -258.02 4739.89 29.07 22.38 4,575.23 4,517.44 704.84 255.70 5,937,106.408 714,321.592 0.51 -263.85 4,770.59 29.12 22.69 4,602.06 4,544.27 718.63 261.42 5,937,120.352 714,326.919 0.52 -269.73 4,801.39 29.15 22.73 4,628.96 4,571.17 732.46 267.21 5,937,134.343 714,332.313 0.12 -275.68 4,831.99 29.30 22.63 4,655.67 4,597.88 746.24 272.97 5,937,148.285 714,337.680 0.52 -281.60 4,862.49 29.15 22.58 4,682.26 4,624.49 759.99 278.70 5,937,162.189 714,343.011 0.50 -287.49 4,892.79 28.80 22.45 4,708.79 4651.00 773.55 284.32 5,937,175.902 714,348.245 1.17 -293.26 4,923.39 28.55 22.36 4,735.64 4,677.85 787.13 289.91 5,937,189.629 714,353.454 0.83 -29902 4,954.29 28.45 22.49 4,762.79 4,705.00 800.76 295.54 5,937,203.412 714,358.689 0.38 -304.80 4,985.29 28.42 22.57 4,790.05 4,732.26 814.39 301.19 5,937,217.201 714,363.955 0.16 -310.61 5,016.19 28.42 22.51 4,817.23 4,759.44 827.97 306.83 5,937,230.937 714,369.205 0.09 -316.41 5,046.89 28.40 22.63 4,844.23 4,786.44 841.46 312.44 5,937,244.578 714,374.425 0.20 -322.17 5,077.19 28.37 22.68 4,870.89 4,813.10 854.75 317.98 5,937,258.022 714,379.594 0.13 -327.87 5,107.49 28.28 22.63 4,897.56 4,839.77 868.02 323.52 5,937,271.441 714,384.752 0.31 -333.56 5,137.79 28.20 22.72 4,924.26 4,866.47 881.25 329.05 5,937,284.821 714,389.901 0.30 -339.24 5,166.09 28.17 22.73 4,950.96 4,893.17 894.45 334.58 5,937,298.172 714,395.053 0.10 -344.92 5,198.39 28.17 22.78 4,977.67 4,919.88 907.64 340.11 5,937,311.514 714,400.209 0.08 -350.61 5,206.00 29.69 22.78 4,984.33 4,926.54 911.03 341.54 5,937,314.947 714,401.537 19.97 -352.07 5,223.00 28.89 20.81 4,999.16 4,941.37 918.76 344.62 5,937,322.752 714,404.406 7.37 -355.25 5,254.88 26.90 18.54 5,027.34 4,969.55 932.79 349.65 5,937,338.926 714,409.035 7.07 -36044 3222019 2:33:53AM Page 13 COMPASS 5000.1 Build BID BP Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 03-32 Project'. PBU TVD Reference: KB (03 57.79usft (03-326) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL7 Survey Calculation Method: Minimum Curvature Design: 03-32BL7 Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec lusft) 1") PI (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 5,352.11 24.85 10.81 5,114.84 5,057.05 973.73 36048 5,937,378.152 714,418.698 4.06 -371.75 5,448,49 24.10 1.88 5,202.59 5,144.80 1,013.30 364.93 5,937,417.834 714,422.018 3.91 -376.65 5,544.62 22.43 351.87 5,290.93 5,233.14 1,051.09 362.98 5,937,455.550 714,418.996 4.46 -375.14 5,638.45 22.12 342.15 5,377.79 5,320.00 1,085.64 355.03 5,937,489.857 714,410.070 3.94 -367.59 5,732.19 22.06 331.60 5,464.88 5,406.89 1,117.94 341.24 5,937,521.748 714,395.372 4.23 -354.18 5,831.67 21.97 322.61 5,556.94 5,499.15 1,149.16 321.05 5,937,552.388 714,374.304 3.39 -334.35 5,926.80 20.59 313.51 5,645.60 5,587.81 1,174.83 298.11 5,937,577.389 714,350.641 3.76 -311.70 6,021.67 19.71 304.07 5,734.69 5,676.90 1,195.28 272.75 5,937,597.113 714,324.714 3.55 -286.58 6,116.44 21.00 293.34 5,823.57 5,765.78 1,210.97 243.91 5,937,611.974 714,295.441 4.16 -257.93 6,212.34 24.20 285.77 5,912.12 5,854.33 1,223.12 209.20 5,937,623.139 714,260.401 4.50 -223.36 6,305.85 27.08 280.50 5,996.42 5,938.63 1,232.21 169.81 5,937,631.108 714,220.775 3.93 -184.08 6,404.48 29.23 276.23 6,083.38 6,025.59 1,238.92 123.79 5,937,636.505 714,174.582 2.99 -138.14 6,500.73 32.60 272.74 6,165.95 6,108.16 1,242.71 74.51 5,937,638.896 714,125.219 3.96 -88.91 6,594.26 36.06 269.89 6,243.18 6,185.39 1,243.86 21.80 5,937,638.551 714,072.496 4.08 -36.21 6,688.83 39.07 266.55 6,318.15 6,260.36 1,242.02 -35.81 5,937,635.070 714,014.973 3.84 21.41 6,784.88 41.81 261.58 6,391.26 6,333.47 1,235.50 -97.72 5,937,626.803 713,953.273 4.40 83.39 - 6,880.28 45.00 258.32 6,460.57 6,402.78 1,224.01 -162.23 5,937,613.489 713,889.715 4.09 148.03 6,976.61 48.54 256.93 6,526.54 6,468.75 1,208.95 -230.77 5,937,596.488 713,821.037 3.82 216.74 7,071.51 49.99 253.14 6,588.48 6,530.69 1,190.36 -300.21 5,937,575.938 713,752.158 3.39 286.39 7,167.19 52.71 250.37 6,648.24 6,590.45 1,166.94 -371.14 5,937,550.515 713,681.917 3.63 357.59 7,263.61 57.17 249.26 6,703.61 6,645.82 1,139.70 445.19 5,937,521.180 713,608.674 4.72 431.95 7,358.72 60.53 249.48 6,752.80 6,695.01 1,111.03 -521.36 5,937,490.360 713,533.355 3.54 508.45 7,454.42 61.72 250.06 6,799.02 6,741.23 1,082.05 -599.99 5,937,459.766 713,455.581 1.35 587.41 7,550.16 61.96 249.63 6,844.20 6,786.41 1,052.97 -679.23 5,937,427.847 713,377.204 0.47 666.98 7,644.27 61.70 250.04 6,888.63 6,830.84 1,024.37 -757.11 5,937,397.050 713,300.173 0.47 745.18 7,740.72 60.21 247.96 6,935.46 6,877.67 994.16 -835.82 5,937,364.626 713,222.351 2.44 824.24 7,836.71 59.65 247.77 6,983.55 6,925.76 962.86 -912.77 5,937,331.156 713,146.325 0.61 901.55 3222019 2:33: 53AM Page 14 COMPASS 5000.1 Build 81D M BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: K6 @ 57.79usft (03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellborn: 03-32131-1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DUB V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 7,933.11 60.50 246.87 7,031.65 6,973.86 930.65 -989.85 5,937,296.767 713,070.190 1.20 979.00 8,027.38 60.14 246.90 7,078.32 7,020.53 898.49 -1,065.18 5,937,262.490 712,995.810 0.38 1,054.70 8,123.40 59.66 246.60 7,126.48 7,068.69 865.70 -1,141.51 5,937,227.548 712,920.449 0.57 1,131.40 8,218.99 59.44 249.79 7,174.93 7,117.14 835.10 -1,218.00 5,937,194.785 712,844.859 2.89 1,208.24 8,314.89 60.00 253.28 7,223.30 7,165.51 808.88 -1,296.54 5,937,166.351 712,767.101 3.20 1,287.07 8,409.59 60.63 256.94 7,270.21 7,212.42 787.75 -1,378.03 5,937,142.977 712,688.246 3.42 1,366.80 8,505.93 61.28 261.84 7,317.00 7,259.21 772.26 -1,458.78 5,937,125.146 712,605.974 4.50 1,449.73 8,600.32 59.95 266.35 7,363.33 7,305.54 763.78 -1,540.55 5,937,114.350 712,524.478 4.39 1,531.59 8,697.11 58.79 268.24 7,412.65 7,354.66 759.85 -1,623.74 5,937,108.053 712,441.442 2.06 1,614.82 8,792.44 58.58 270.07 7,462.20 7,404.41 758.64 -1,705.16 5,937,104.540 712,360.084 1.65 1,696.26 8,887.81 57.50 268.79 7,512.68 7,454.89 757.84 -1,786.07 5,937,101.445 712,279.238 1.61 1,777.17 8,983.26 58.67 269.06 7,563.14 7,505.35 756.33 -1,867.08 5937,097.628 712,198.312 1.25 1,858.18 9,079.07 60.25 269.90 7,611.83 7,554.04 755.58 -1,949.59 5,937,094.543 712,115.859 1.81 1,940.70 9,174.79 59.36 269.39 7,65997 7602.18 755.07 -2,032.32 5,937,091684 712,033.181 1.04 2,02343 9,269.65 60.88 268.38 - 7,707.23 7,649.44 753.46 -2,114.55 5,937,087.745 711,951.033 1.85 2,105.67 9,365.52 60.09 268.23 7,754.46 7,696.67 751.00 -2,197.94 5,937,082.912 711,867.749 0.84 2,189.09 9,461.09 60.76 269.19 7,801.63 7,743.84 749.13 -2,281.03 5,937,078.686 711,784.744 1.12 2,272.20 9,556.62 60.08 268.93 7,848.78 7,790.99 747.77 -2,364.10 5,937,074.967 711,701752 0.75 2,355.28 9,652.31 61.07 268.86 7,895.79 7,838.00 746.16 -2,447.43 5,937,070.995 711,618.506 1.04 2,438.62 9,746.26 60.42 269.16 7,941.71 7,883.92 744.74 -2,529.39 5,937,067.253 711,536.629 0.75 2,520.58 9,842.83 61.34 268.55 7,988.70 7,930.91 743.05 -2,613.73 5,937,063.173 711,452.370 1.10 2,604.94 9,939.02 60.17 268.52 8,035.69 7,977.90 740.91 -2,697.63 5,937,058.647 711,368.568 1.22 2,688.86 10,034.33 58.81 268.13 8,084.08 8,026.29 738.51 -2,779.71 5,937,053.921 711,286.597 1.47 2,770.96 10,129.81 56.84 268.23 8,134.92 8,077.13 735.94 -2,860.48 5,937,049.062 711,205.934 2.07 2,851.76 10,225.62 54.27 268.79 8,189.11 8,131.32 733.68 -2,939.46 5,937,044.762 711,127.051 2.73 2,930.75 10,320.85 52.98 268.18 8,245.59 8,187.80 731.86 -3,016.10 5,937,040.564 711,050.497 1.45 3,007.42 10,417.34 50.38 268.56 8,305.41 8,247.62 729.70 -3,091.77 5,937,036.260 710,974.927 2.71 3,083.10 3/222019 2.33:53AM Page 15 COMPASS 5000.1 Build BID BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project. PBU TVD Reference: KB @ 57.79usft (03-328) Site: 03 MD Reference: KB @ 57.79usft (03-326) Well: 03-32 North Reference: True Wellbore: 03-3261.1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc An TVD NDSS NIS E/W Northing Easting DLeg V. Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (*/100usft) (usft) 10,512.94 47.07 269.78 8,368.47 8,310.68 728.64 -3,163.60 5,937,033.162 710,903.162 3.59 3,154.94 10,608.16 45.90 268.43 8,434.03 8,376.24 727.57 -3,232.64 5,937,030.132 710,834.183 1.60 3,223.99 10,704.03 46.63 268.81 8,500.31 8,442.52 725.90 -3,301.89 5,937,026.501 710,765.012 0.81 3,293.25 10,798.68 48.44 270.45 8,564.21 8,506.42 725.47 -3,371.70 5,937,024.083 710,695.242 2.30 3,363.06 10,835.15 48.44 270.25 8,588.40 8,530.61 725.63 -3,398.99 5,937,023.476 710,667.961 041 3,390.35 10,905.84 50.57 270.25 8,634.31 8,576.52 725.87 -3,452.74 5,937,022.184 710,614.225 3.01 3,444.10 10,937.63 58.94 270.56 8,652.63 8,594.84 726.06 -3,478.68 5,937,021.635 710,588.293 26.34 3,470.03 10,971.04 67.64 268.50 8,667.64 8,609.85 725.79 -3,508.49 5,937,020.524 710,558.501 26.61 3,499.84 11,002.02 76.20 269.11 8,677.24 8,619.45 725.18 -3,537.91 5,937,019.080 710,529.115 27.69 3,529.27 11,033.91 84.24 271.23 8,682.66 8,624.87 725.28 -3,569.31 5,937,018.289 710,497.728 26.05 3,560.66 11,065.22 91.56 272.83 8,683.80 8,626.01 726.39 -3,600.56 5,937,018.510 710,466.463 23.93 3,591.89 11,097.12 99.80 273.01 8680.65 8,622.86 728.00 -3,632.23 5,937,019.226 710,434.757 25.84 3,623.55 11,129.21 108.80 273.84 8.672.70 8,614.91 729.86 -3,663.23 6,937,020.196 710,403.718 28.47 3,654.52 11,160.86 115.23 276.33 8660.82 8,603.03 732.44 -3,692.43 5,937,021.950 710,374.458 21.29 3,683.69 11,192.23 107.71 275.02 8649.35 8,591.56 735.32 -3,721.46 5,937,024.001 710,345.360 24.28 3,712.69 11,224.81 101.78 270.72 8,641.05 8,563.26 736.88 -3,752.91 5,937,024.668 710,313.884 22.23 3,744.11 11,257.22 96.02 265.40 8,636.04 8,578.25 735.78 -3,784.88 5,937,022.667 710,281.954 24.05 3,776.10 11,289.42 89.47 262.89 8,634.50 8,576.71 732.50 -3,816.86 5,937,018.480 710,250,086 21.78 3,808.11 11,320.93 89.12 261.17 8,634.88 8,577.09 728.13 -3,848.06 5,937,013.228 710,219.022 5.57 3,839.36 11,352.54 89.36 261.18 8,635.30 8,577.51 723.28 -3,879.29 5,937,007.495 710,187.941 0.76 3,870.65 11,384.96 91.11 261.34 8,635.17 8,577.38 718.36 -3,911.33 5,937,001.661 710,156.053 5.42 3,902.74 11,418.03 91.66 261.61 8,634.37 8,576.58 713.46 -3,944.03 5,936,995.835 710,123.512 1.85 3,935.49 11,447.35 92.28 261.43 8,633.36 8,575.57 709.13 -3,973.01 5,936,990.693 710,094.665 2.20 3,964.52 11,460.11 92.74 261.39 8,632.80 8,575.01 707.23 -3,985.62 5,936,988.432 710,082.120 3.62 3,977.15 11,492.28 92.47 260.90 8,631.34 8,573.55 702.28 4,017.37 5,936,982.587 710,050.521 1.74 4,008.96 11,523.54 89.72 260.31 8,630.74 8,572.95 697.18 -4,048.20 5,936,976.612 710,019.848 9.00 4,039.85 11,555.44 88.35 259.26 8,631.28 8,573.49 691.53 4,079.59 5,936,970.068 709,988.634 5.41 4,071.30 322/2019 2:33:53AM Page 16 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: Pat.) TVD Reference: KB @ 57.79usft(03-32B) Site: 03 MD Reference: KB @ 57.79usft (03-32B) Well: 03-32 North Reference: True Wellbore: 03-32BL1 Survey Calculation Method: Minimum Curvature Design: 03-32BL1 Database: EDM R5K-Alaska PROD -ANCPi Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Seo (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100ue111t) (usft) 11,587.79 89.45 260.65 8631.90 8,574.11 685.88 -4,11144 5,936,963.525 709,956.962 548 4,103.21 11,619.58 89.48 260.67 8,632.20 8,574.41 680.73 4,142.80 5,936,957.479 709,925.755 0,11 4,134.64 11,651.66 89.31 262.09 8,632.54 8,574.75 675.92 -4,174.52 5,936,951.773 709,894.191 4.46 4,166.40 11,684.39 88.76 262.48 8,633.09 8,575.30 671.52 -4,206.95 5,936,946.461 709,861.901 2.06 4,198.88 11,715.33 88.76 260.47 8,633.76 8,575.97 666.94 -4,237.54 5,936,941.010 709,831.455 6.49 4,229.52 11,747.31 88.28 260.30 8,634.59 8,576.80 661.60 -4,269.06 5,936,934.778 709,800.101 1.59 4,261.10 11,779.38 88.45 261.54 8,635.50 8,577.71 656.54 -4,300.71 5,936,928.823 709,768.604 3,90 4,292.81 11,811.45 88.35 261.30 8,636.40 8,578.61 651.76 -4,332.41 5,936,923.143 709,737.056 0.81 4,324.56 11,843.53 88.21 261.61 8,637.36 8,579.57 846.99 -4,364.12 5,936,917.481 709,705.496 1.06 4,356.33 11,875.25 88.56 261.89 8,638.25 8,580.46 642.44 -4,395.50 5,936,912.043 709,674.260 1.41 4,387.76 11,907.62 89.38 264.26 8,638.83 8,581.04 638.54 -4,427.63 5,936,907.231 709,642.259 7.75 4,419.93 11,939.40 89.52 264.93 8,639.14 8,581.35 635,55 4,459.26 5,936,903.341 709,610.721 2.15 4,45160 11,971.07 89.00 264.74 8,639.55 8,581.76 632.70 -4,490.80 5,936,899.596 709,579.277 1.75 4,483.17 12,002.97 88.59 263.36 8,640.22 8,582.43 629.39 -4,522.52 5,938,895.392 709,547.665 4.51 4,514.92 12,035.15 88.73 265.19 8,640.97 8,583.18 626.18 4,554.53 5,936,891.276 709,515.761 5.70 4,546.97 12,066.96 88.66 264.59 8,641.70 8,583.91 623.35 -4,586.21 5,936,887.546 709,484.181 1.90 4,578.67 12,098.58 88.56 265.70 8,642.46 8,584.67 620.67 4,617.70 5,936,883.978 709,452.774 3.52 4,610.20 12,130.56 88.32 265.78 8,643.33 8,585.54 618.30 4,649.58 5,936,880.699 709,420.976 0.79 4,642.10 12,162.16 88.63 267.36 8,644.18 8,586.39 616.41 -4,681.11 5,936,877.916 709,389.513 5.09 4,67365 12,194.18 88.11 266.20 8,645.09 8,587.30 614.61 4,713.07 5,936,875.212 709,357.622 3.97 4,705.63 12,226.36 88.14 267.20 8,646.14 8,588.35 612.76 4,745.18 5,936,872.450 709,325.580 3.11 4,737.76 12,257.83 88.28 267.81 8,647.12 8,589.33 611.39 4,776.60 5,938,870.189 709,294.209 1.99 4,769.20 12,289.29 88.56 267.59 8,647.99 8,590.20 610.13 -4,808.03 5,936,868.036 709,262.836 1.13 4,800.63 12,321.43 88.59 267.62 8,648.79 8,591.00 608.79 4,840.13 5,936,865.783 709,230.787 0.13 4,832.75 12,353.30 88.01 268.11 8,649.73 8,591.94 607.60 -4,871.96 5,936,863.693 709,199.001 2.38 4,864.59 12,384.86 85.98 270.13 8,651.39 8,593.60 607.12 -4,903.47 5,936,862.315 709,167.519 9.07 4,896.10 12,416.70 84.57 270.59 8,654.01 8,596.22 607.32 4,935.20 5,936,861.614 709,135.798 4.66 4,927.83 3/222019 2.33:53AM Page 17 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU 8,581.84 Site: 03 Local Coordinate Reference: Well: 03-32 Well 03-32 Wellbore: 03-32BL1 708,666.782 Design: 03-32BL1 0.65 Survey 271.00 MD Inc 8,581.49 (usft) V) KB @ 57.79usft (03-3213) 12,448.72 86.88 12,480.51 89.59 12,511.67 89.83 12,544.13 88.59 12,576.10 89.14 12,607.73 89.83 12,639.00 91.54 12,670.90 93.22 12,703.03 94.56 12,734.70 96.66 12,766.18 97.90 12,798.33 95,56 12,830.19 92.74 12,861.33 92.02 Tie In Point 16.58 12,887.00 92.19 Top of Whipstock - KOP 8,587.13 12,905.76 89.94 Interpolated AZ 5,936,860.126 12,930.19 86.03 Interpolated AZ TVD 12,960.45 85.48 Interpolated AZ Northing 12,990.71 84.90 First Clean Survey V. Sec 13,020.68 85.33 13,050.35 85.02 13,080.38 85.20 BP Final Survey Report 272.58 8,639.63 8,581.84 627.27 Local Coordinate Reference: -5,403.86 Well 03-32 708,666.782 0.65 5,396.23 271.00 TVD Reference: 8,581.49 627.85 KB @ 57.79usft (03-3213) -5,422.61 5,936,868.309 708,648.028 14.64 MD Reference: 269.50 8,640.14 KB @ 57.79usft (03-328) 627.95 -5,447.02 5,936,867.723 708,623.627 North Reference: 17.14 5,439.37 True 8,642.38 8,584.59 626.38 -5,477.14 5,936,865.290 Survey Calculation Method: 708,593.559 Minimum Curvature 16.58 5,469.51 259.02 8,644.92 8,587.13 622.06 Database: -5,506.97 5,936,860.126 EDM R5K - Alaska PROD - ANCP1 708,563.865 Azi TVD TVDSS NIS FIN Northing 614.67 Easftng DLeg -5,535.89 V. Sec V) (usft) (usft) (usft) (usft) (usft) 8,649.97 (usft) (°It00usft) (usft) 270.58 8,656.40 8,598.61 607.64 -4,967.13 5,936,861.033 19.41 709,103.876 7.21 4959.75 272.50 8,657.38 8,599.59 608.50 4,998.89 5,936,860.986 708,481.281 709,072.107 10.45 4,991.50 274.53 8,657.54 8,599.75 610.41 -5,029.99 5,936,862.013 709,040.967 6.56 5,022.57 274.85 8,657.98 8,600.19 613.06 -5,062.33 5,936,863.747 709,008.559 3.95 5,054.89 275.68 8,658.62 8,600.83 615.99 -5,094.16 5,936,865.778 708,976.662 3.11 5,086.68 274.83 8,658.90 8,601.11 618.89 -5,125.66 5,936,867.777 708,945.098 3.46 5,118.14 272.66 8,658.53 8,600.74 620.93 -5,156.86 5,936,868.933 708,913.856 8.83 5,149.31 271.96 8,657.20 8,599.41 622.22 -5,188.70 5,936,869.314 708,881.989 5.70 5,181.14 269.84 8,655.02 8,597.23 622.72 -5,220.75 5,936,868.908 708,849.940 7.79 5,213.18 269.42 8,651.93 8,594.14 622.52 -5,252.27 5,936,867.810 708,818.444 6.76 5,244.70 270.89 8,647.94 8,590.15 622.60 -5,283.49 5,936,867.008 708,787.231 6.08 5,275.92 272.17 6,644.17 8,58638 623.45 -5,315.41 5,936,866.955 708,755.307 8.28 5,307.82 272.46 8,641.86 8,584.07 624.74 -5,347.15 5,936,867.337 708,723.538 8.90 5,339.55 272.59 8,640.57 8,582.78 626.11 -5,378.24 5,936,867.825 708,692.430 2.35 5,370.62 272.58 8,639.63 8,581.84 627.27 -5,403.86 5,936,868.255 708,666.782 0.65 5,396.23 271.00 8,639.28 8,581.49 627.85 -5,422.61 5,936,868.309 708,648.028 14.64 5,414.97 269.50 8,640.14 8,582.35 627.95 -5,447.02 5,936,867.723 708,623.627 17.14 5,439.37 264.50 8,642.38 8,584.59 626.38 -5,477.14 5,936,865.290 708,593.559 16.58 5,469.51 259.02 8,644.92 8,587.13 622.06 -5,506.97 5,936,860.126 708,563.865 18.15 5,499.39 252.29 8,647.48 8,589.69 614.67 -5,535.89 5,936,851.914 708,535.175 22.42 5,526.39 246.52 8,649.97 8,592.18 604.27 -5,563.55 5,936,840.739 708,507.819 19.41 5,556.17 241.79 8,652.53 8,594.74 591.23 -5,590.47 5,936,826.941 708,481.281 15.70 5,583.24 3/222019 2:33:53AM Page 18 COMPASS 5000.1 Build 81D RE BP Final Survey Report Company. North America - ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: KB @ 57.79usft (03-328) Site: 03 MD Reference: KB Q 57.79usft (03-328) Well: 03-32 North Reference: True Wellbore: 03-32BL7 Survey Calculation Method: Minimum Curvature Design: 03-328L1 Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Seo (usft) (°) (°) (waft) (usft) (usft) (usft) (usft) (usft) (°/100usft ) (usft) 13,110.50 83.47 236.25 8,655.51 8,597.72 575.81 -5,616.16 5,936,810.799 708,456.043 19.18 5,609.11 13,140.10 83.22 230.07 6,658.94 8,601.15 558.19 -5,639.68 5,936,792.521 708,433.035 20.75 5,632.83 13,170.02 8421 224.34 8,662.22 8,604.43 538.00 -5,661.49 5,936,771.714 708,411.806 19.32 5,654.87 13,200.03 83.04 218.59 8,665.56 8,607.77 515.66 -5,681.23 5,936,748.826 708,392.708 19.44 5,674.87 13,230.11 84.31 212.21 8,668.87 8,611.08 491.30 -5,698.54 5,936,723.988 708,376.099 21.50 5,692.46 13,250.59 81.70 208.39 8,671.37 8,813.58 473.76 -5,708.79 5,938,706.160 708,366.347 22.47 5,702.92 13,280.60 80.96 202.37 8,675.90 8,618.11 446.97 -5,721.50 5,936,679.021 708,354.402 19.98 5,715.94 13,310.87 83.63 206.77 8,679.96 8,622.17 419.70 -5,733.97 5,936,651.410 708,342.710 16.89 5,728.72 13,340.67 82.70 214.36 8,683.51 8,625.72 394.24 -5,749.01 5,936,625.536 708,328.406 25.48 5,744.05 13,371.12 82.08 221.01 8,687.54 8,629.75 370.36 -5,76745 5,936,601.152 708,310.653 21.74 5,762.77 13,400.63 79.51 215.32 8,692.27 8,634.48 347.48 -5,785.44 5,936,577.763 708,293.315 20.93 5,781.02 13,429.91 79.45 210.20 8,697.62 8,639.83 323.28 -5,801.01 5,936,553.132 708,278.437 17.19 5,796.88 13,459.90 75.40 204.35 8,704.15 8,646.36 297.28 -5,814.43 5,936,526.770 708,265.766 23.34 5,810.59 13,490.10 71.67 198.99 8,712.72 8,65493 270.39 -5,825.13 5,936,499.585 708,255.834 21.03 5,821.60 13,519.93 67.58 192.69 8,723.11 8,665.32 243.52 -5,832.77 5,936,472.506 708,248.954 24.08 5,829.56 13,550.28 64.66 185.40 8,735.41 8,677.62 216.14 -5,837.15 5,936,445.018 708,245.355 23.97 5,834.26 13,580.35 62.27 178.08 8,748.85 8,691.06 189.28 -5,637.99 5,936,418.144 708,245.283 23.18 5,835.40 13,610.24 59.50 171.44 8,763.41 8,705.62 163.30 -5,835.62 5,936,392.241 708,248.382 21.50 5,833.34 13,640.56 58.02 165.37 8,779.14 8,721.35 137.92 -5,830.43 5,936,367.022 708,254.296 17.80 5,82844 13,670.45 56.89 162.58 8,795.23 8,737.44 113.70 -5,823.48 5,936,343.016 708,261.931 8.73 5,82177 13,705.72 57.29 155.39 8,814.41 8,756.62 86.09 -5,812.87 5,936,315.720 708,273.321 17.15 5,811.48 13,728.87 57.30 159.93 8,826.92 8,769.13 68.08 -5,805.46 5,936,297.927 708,281.230 16.50 5,804.29 13,761.47 56.59 160.09 8,844.70 8,786.91 42.41 -5,796.12 5,936,272.527 708,291.295 2.22 5,795.24 13,791.25 57.32 153.03 8,860.95 8,803.16 19.53 -5,786.20 5,936,249.942 708,301.866 20.02 5,785.58 13,821.56 57.14 146.95 8,877.37 8,819.58 -2.52 -5,773.46 5,936,226.260 708,315222 16.88 5,773.10 13,850.49 56.85 139.43 8,893.14 8,835.35 -21.93 -5,758.94 5,936,209.277 708,330.284 21.82 5,758.81 13,875.93 57.04 134.32 8,907.03 8,849.24 -37.48 -5,744.38 5,936,194.144 708,345.288 16.85 5,744.42 322/2019 2,33:53AM Page 19 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: PBU Site: 03 Well: 03-32 Wellbore: 03-32BL1 Design: 03-32BL1 Survey MD Inc Azi (usft) 13,925.00 57.04 134.32 Projection BP Final Survey Report Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 03-32 KB @ 57.79usft (03-328) KB @ 57.79usft (03-328) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 ND NDSS NIS E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 8,933.72 8,875.93 -66.25 -5,714.92 5,936,166.227 708,375.547 0 00 5,715.30 3222019 2.'33:53AM Page 20 COMPASS 5000.1 Build 81D no PMO& PBU WELLBORE DETAILB'. 0332BL1 wEte+PxErrorawnw Bka. 03 Wal: 03.72 Wam10n1: 03-MOL1 w.,.�Li u nn menses 0 �� M wasew.®isi 03-32BL1 ffiB Te on MD: '1286133 mii0 T. vae�ilrvol aawmre wnsriml sxwnry0 aelo-mx SbI IOOttI.emEl Meeuretlawa.lmw. M..18uMIT3J]Bf c.aeamn Wnm. aummcay.en Easfing (200 usNln) Mean Bea Level North America - ALASKA - BP PBU 03 03-32 03-32BL1 03-32BL1 WP03 500292114160 AOGCC Offset Well Report 14 February, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: 03 Site Error: o0ousft Reference Well: 03-32 Well Error: 0.00usft Reference Wellbore 03-32BL1 Reference Design: 03-32BL1 WP03 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-32 Mean Sea Level KB @ 57.79usft (03-32B) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPI Offset Datum Reference 03-32BL1 WP03 Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria WARNING. There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 2/14/2019 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 60.89 5,198.39 03-32 Srvy 1 GCT MS (03-32) GCT -MS Schlumberger GCT multishot 5,206.00 5,448.49 03-32B Srvy 1 lnc+Tren l (03-32B) INC+TREND Inclinometer +known azi trend 5,544.62 10,835.15 03-32B Srvy 2 MWD+IFR+MS (03-32B) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 10,905.84 11,447.3503-32B Srvy 3 MWD+IFR+MS(03-328) MWD+IFR+MS-WOCA MWD +IFR+Muth Station W/O Crustal 11,460.11 12,861.3303-32B Srvy4 MWD+IFR+MS(03-32B) MWD+IFR+MS-WOCA MWD + IFR +Muth Station W/O Crustal 12,887.00 13,925.00 Survey #1 (03-32131-1) MWD MWD -Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 03 03-02 - 03-02 - 03-02 12,633.49 10,875.00 362.16 03-03-03-03-03-03 6,659.74 6,250.00 249.02 03-05 - 03-05 - 03-05 4,688.77 4,600.00 278.82 03-06 - 03-06 - 03-06 4,381.94 4,400.00 103.69 03-08-03-08-03-08 4,254.83 4,175.00 334.56 03-11 - 03-11 - 03-11 3,655.47 3,725.00 9.22 03-13-03-13-03-13 3,251.07 3,275.00 331.41 03-14 - 03-14 - 03-14 3,696.57 3,675.00 118.59 03 -14 -03 -14A -03-14A 3,682.88 3,650.00 118.23 03 -14 -03 -14B -03-14B 3,682.68 3,650.00 118.23 03-14-03-14BL1-03-14811 3,682.68 3,650.00 118.23 03-15 - 03-15B - 03-15B 8,600.00 7,625.00 354.90 03 -15 -03 -15C -03-15C 8,600A0 7,625.00 354.90 03-17 - 03-17 - 03-17 9,181.54 7,900.00 203.34 03-26 - 03-26 - 03-26 3,973.12 4,100.00 233.08 03-31 - 03-31 - 03-31 1,995.54 2,000.00 120.30 03 -31 -03 -31A -03-31A 1,995.54 2,000.00 120.30 03-32 - 03-32 - 03-32 5,515.60 5,525.00 35.06 03 -32 -03 -32A -03-32A 5,523.90 5,525.00 37.02 03-32 - 03-32B - 03-328 13,175.00 13,225.00 114.27 03-32-03-3281-7-03-32BL1 WP03 13,965.32 13,965.32 0.00 03-32 - 03-32BL2 - 03-32BL2 28.81 28.81 0.00 03-32-03-32BL2-03-32BL2 WP03 11,558.48 11,675.00 224.11 03-33 - 03-33 - 03-33 2,741.82 2,750.00 120.61 03 -33 -03 -33A -03-33A 2,741.82 2,750.00 120.60 03-33 - 03-33B - 03-338 2,747.01 2,750.00 120.66 03-33 - 03-33C - 03-33C 2,747.01 2,750.00 120.66 03-34 - 03-34 - 03-34 2,292.39 2,300.00 236.23 03 -34 -03 -34A -03-34A 2,292.39 2,300.00 236.23 03 -34 -03 -34B -03-34B 2,300.83 2,300.00 236.32 03-34 - 03-34CXX - Plan #4 2,292.39 2,300.00 236.23 21142019 12.50:00PM Page 2 of 2 COMPASS 5000.1 Build 81D Printed 3/122019 10:29:12AM North America - ALASKA - BP Pape 1 ore Cementing Report Common Well Name: 0332 / 03 Report no.: 1 Report date'. 2/13/2019 Project Pau Site: 03 Spud Date/Time: 8124/1984 Event Type: COM- ONSHORE (CON) Start Date: 2/10/2019 End Date: 2/15/2019 AFE No.: Contractor NABORSALASKA DRILLING INC. Rig Name/No.: CDR-2 Rig Release: X3-0198Y-C: (482,803.00) BPUOI. USA00001395 Active datum: KB ®57.79usft (above Mean Sea Level) Gemmel Infomnatlon Job type: Primary Cement job start date/time. 2/13/2019 3'.30PM Job end date/time: 2/13/2019 B:OOPM Cement Company: SCHLUMBERGER Cementer: Cemented String: PRODUCTION LINER 1 String Size: 2.875 (in) String Set TMD: 13,925.00 (usft) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NOMOVEMENT Rotating Time (Start-End): RPM'. Rotating Torque (initlavg/max): (ft-lbo Reciprocating Time (Start-End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: CEMENT Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G-CLASS Description: LEAD SLURRY Density. 15.30 (ppg) Yield. 1.3100 (ft'Isk) Mix Water Ratio: 4.287 (gal/sk94) Excess: 20.00(%) Mix Method: BATCH Sacks Used: 114.00 (941b sacks) Water Volume: 11.6 (bbl) Excess Slurry Volume: 4.4 (be/) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 23.9 (boll Slurry Volume: 28.6 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: PV: YP: Viscosity: Gels 10 Sec: Gels 10 Min: Additives Name Type Amount Units Concentration Unit 0163 CEMENT 5.000 %BWOC D047 ANTIFOAMAGENT 0.100 GAIJSX D206 ANTIFOAM AGENT 0.100 GAUSX D065 WEIGHTINGAGENT 1.000 %BWOC D600 G GAS-BLOCK 1.600 GAUSX D167 FLUID LOSS 0.100 %BWOC 0177 RETARDER 0.020 1 GAUSX Printed 3/122019 10:29:12AM Printed 3/12/1019 10:29:12AM Page 2 of 2 North America - ALASKA - BP Cementing Report. Common Well Name: 03-32 / 03 Report no.: 1 Report dale: 2/13/2019 Prelecl. pm- Site: 03 Spud Date/T�me: 8/24/1984 Event Type. COM- ONSHORE (CON) —} Start Date. 2/10/2019 i End Date: 2/15/2019 I AFE No.: Contractor: NABORS ALASKA DRILLING INC Rig Name/No.-. CDR-2 1 Rig Release: X3-0198Y-C'. (482,803.00) BPUOI: USA00007395 _._._ Active datum. KB (li)57.79ustt (above Mean Sea Level) Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. IMud Circ. Top Bottom Plug Pressure Floel Preuum Returns Circulate Cmt V01 to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Hald Prior Surface Mud Losl Flow (gpm) (Psi) (hr) (bbl) (bbl) After (psi) (min) 1 PRIMARY CEMENT 11,495.00 13,925.001 YI Iy Pumpitlp Schedule Fluid pumped Volume Avg. Max Disp. SlurryTop Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD Pmp date/time job Used te(bbl) Rate (bbl min) nMg,Cmt (usft) (sobbllmin Tub Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usf ) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N LoglSurvey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 3/12/1019 10:29:12AM THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin CTD and RWO SDE BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 03-32BL1 BP Exploration (Alaska), Inc. Permit to Drill Number: 218-169 Surface Location: 332' FSL, 796' FWL, SEC. 11, TION, R15E, UM Bottomhole Location: 245' FSL, 4947' FEL, SEC. 10, TION, R15E, UM Dear Mr. Mclaughlin: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.olaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 209-005, API No. 50-029-21141- 02-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Fl Chair DATED this2-6 day of December, 2018. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL 20 AAC 25.005 °�1c.:U .tlV LD nr7 • 1? ^ . 111 i.. la. Type of Work: Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for: Drill ❑ Lateral 0 • 11b. Stratigraphic Test ❑ Development - Oil 0 • Service - Wrij ❑ Single Zone 0 • Coalbed Gas ❑ Gas Hydrates❑ Rednll ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 'Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 • PBU 03-3261_1 " 3. Address: 6, Proposed Depth: F 12. (s): Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 13965' TVD: 8880'ss PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028327 8 028328 - Surface: 332' FSL, 796' FV%&. Sec. 11, T1 ON, R15E, UM 8. DNR Approval Number: 13. Approximate spud date: 430' FSL, 5046' FEL, Sec. 10, T10N, R15E, UM Top of Productive Horizon: 74-017 February 11, 2019 9. Acres in Property: 2560 14. Distance l0 Nearest Property: Total Depth: 245' FSL, 4947' FEL, Sec. 10, TION. R15E, UM 24120 4b Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 57.79 -feet 15. Distance to Nearest Well Open Surface. x- 714086 y- 5936395 • Zone - ASP 4 GL Elevation MSL: 27B5 • feet to Same Pool: above 393 16. Deviated wells: Kickoff Depth: 12867 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3266 Surface: 2396 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Weiqht Grade COUDIRO Len th MD TVD vin TVD(including steps data) 9.2#/6.5# 13Cr80 STL 2565 11400' 8577'w 13965' 8880'ss 140 sx Class'G' 1tl 19, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. DepthTVD (ft): Junk (measured): 15803 8645 13499 13499 8641 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 1925# Polesel 31 - 111 31 - 111 Surface 2483 13-318" 2400 sx CSIII, 400 sx CS 11 31 .2514 31-2514 Intermediate 5177 35/8" 500 sx Class'G', 300 sx CS 1 29-5206 29-49154 Liner 6571 7" 358 ax LiteCrete. 93 sx Class'G' 4328-10899 4214-8630 Liner 5056 4-1/2' 590 sx Class'G' 10743 - 15799 8527-8645 Perforation Depth MD (ft): 10895 - 15600 Perforation Depth TVD (ft): 8627-8647 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Ciolkosz. Rvan R from without prior written approval. Authorized Name Mclaughlin, Sean M Contact Email Ryan.Ciolkou*bp.com Authorized Title CTD 8 RWO SDE Contact Phone +1 907 564 5977 Authorized Signature /�� • Date IV14 1 6 Commission Use Only Permit to Drill �/ — ��/-r Number: ``77 API: 50- 029-21141-60-00 Permit Approval Date: See cover letter for other requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmeth ne, gas hydrates, or gas contained in shales: Other. �y Samples mq'd: Yes ❑ No Mud log req'd: Yes ❑ No 6d" PE eST ) O �SoC% T S H2S measures Yes (9' No Directional svy req'd: Yes 6X No ❑ —❑/ Spacing exception req'd: Yes ❑ No tai Inclination -only svy req'd: Yes ❑ No Post initial injection MIT req'd: Yes ❑ No ❑ p pess-z=PS 4% itj- O % W APPROVED BY I Approved by: COMMISSIONER THE COMMISSION Date: V7— kl F�qn TO -001 Revised 5/2017 P o.Rjj I G �r �p ( (g)) yR ����8 v This ermit is valid fo h tl o vel 20 AAC 25.005 Submit Form and \� X/_ /�� AoeMm?, u licete�, To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Rig: CDR2 ObpCTD Engineer Target Reservoir: Ivishak Zone 4 Date: December 13, 2018 Re: 03-32B L1 Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 03-3213. 03-32B L1 will be the first lateral of two drilled from the 03-32B wellbore targeting the Ivishak Zone 4. Well was initially completed in the Sag river in 2009 and there is no remaining value/opportunity in parent bore Proposed plan: BP will drill a through tubing sidetrack with a Nabors CDR2 on or around Feb 11th. 2019. CTU will set a CTD whipstock at -12867' for the L1 lateral. CDR2 will mill a 3.80" window in the 4-1/2" liner and drill an Ivishak L1 lateral to -13965' MD. The rig will run, cement and perforate the 2-7/8" 13Cr-80 liner with the top at -11400' MD. The rig will then set another whipstock at 11294', mill at 3.80" window and drill lateral L2 to -12281' MD. The lateral will be completed with a 3-1/2" x 2-7/8" 13Cr-80 liner (Top at -10970' MD) which will be cemented to the top of the Ivishak and perforated. CTD Drill and Complete 03-32B L1 program: Rig Start Date: Feb 11'h, 2019 Pre -Rig Work: (scheduled to begin Aug 15th, 2018) 1. S: Dummy GLMs. Drift. 2. F: A/SL: Load IA. MIT -IA. 3. C: Mill XN. Dummy WS Drift. Set WS with Baker 2 Stage WS System. 4. V: Pre -CTD Tree Work. Rig Work:-e4JAeur 461tc& /a Ile 1. MIRU and test BOPE. Maximum expected surface pressure with ggas (0.10 si/ft) to syrface is 2,467 psi. T'C�T /SORE 'Tb 30Osi 2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling fluid. 3. PU drilling BHA with GR/Resistivity 4. Drill 4.25" hole to L1 lateral TD. 5. Run 3-1/2"x 2-7/8" 13CR-80 liner. 6. Pump primary cement bringing TOC to 7. Perforate liner 8. Set 4-1/2" whipstock at 11294' MD and 9. Drill 4.25" hole to L2 lateral TD 10. Run 3-1/2" x 2-7/8" 13CR-80 liner TOL, 29 bbls of 15.3 ppg liner cmt planned` mill 3.80" window. k'10 W"T�rov5 )� jJ1 C-� 11. Pump primary cement. bring TOC to Top of Ivishak -11,829', 7.4 bbls of 15.3 ppg liner cement planned. 12. Freeze protect well, RDMO Post Rig: 1. V: Tree work as necessary. 2. C: Perforate L2 lateral Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4 ppg brine. • Miliing/drilling: 8.4 ppg drilling fluid for milling window and drilling (534 psi over -balance ). Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.25" Liner Program: • 3-1/2", 9.2#, 13CR-80, STL Solid Liner 11,400' MD — 11430' MD • 2-7/8", 6.5#, 13CR-80, STL Solid Liner 11,430' MD — 13,965' MD • A minimum of 29 bbls of 15.3 ppg cement will be used for cementing the L1 Liner. (TOC =TOL) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 900 . • Magnetic and inclination surveys will be take_ n every 30 ft. • Distance to nearest property — 24,120' • Distance to nearest well within pool — 393' Logging • MWD directional, Gamma Ray and Resistivity will be run over the entire open hole section and contingent CBL run post rig if needed. Perforating: • 2" HES Millennium, 1-1/4" CSH work string • The primary barrier for this operation: a minimum EMW of 8.4 ppg. - • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures All wells pass BP Anti -Collison Risk Requirements. Hazards • DS 03 is an 1-12S drill site. Reservoir Pressure • The reservoir pressure is expected to be 3,266 psi at 8,700' TVDSS. (7.22 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,396 psi. • An EMW of 8.4 ppg for this well will provide 534 psi over -balance to the reservoir. Managed Pressure Drilling — • MPD techniques may be used to improve hole stability. - • An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole stability. • A pressure schedule w i be used for tripping In/Out of the hole. The purpose of the pressure schedule for tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the choke. • At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for hole stability. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka North America - ALASKA - BP PBU 03 03-32 PLAN 03-32131-1 Plan: 03-32BL1 WP03 BP Coil Tubing Report 12 December. 2018 pk&4� Well 03-32 F f)ti Mean Sea Level Company: North America -ALASKA - BP Project: PBU Site: 03 Well: 03-32 Wellhore: PLAN 03-32BL1 Design: 03-32BL1 WP03 BP BP Coil Tubing Report Local Coordinate Reference: Well 03-32 TVD Reference: Mean Sea Level MD Reference: KB @ 57.79usft (03-328) North Reference: True Survey Calculation Method: Minimum Curvature - Database: EDM R5K - Alaska PROD - ANCP1 ject PBU, PBU, PRUDHOE p System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Datum: NAD27' OGP-Usa AK [4267.15864] Using Well Reference Point p Zona: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586° Using geodetic scale factor Site 03, TR -10 -15 ---_-- Site Position: Northing: 5,939,219.130 usft Latitude: 70° 14' 13.210 N From: Map Easting: 712,287.910 usft Longitude: 148° 17'8.774 W Position Uncertainty: 0 D usft Slot Radius: 0.000 in Grid Convergence: 1.61 ° Well 03-32, 03-32 Well Position •N/ -S 0.00 usk Northing: 5,936,394.630 usft Latitude: 70° 13'44.941 N +El -W 0.00 daft Easting: 714,086.010 usft Longitude: 148" 16'18,863 W Position Uncertainty 0.00 usft Wellhead Elevation: 28.98 usft Ground Level: 27.65 usft i Wellbore PLAN 03-32BL1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2018 2/112019 17.11 80.92 57,429 Design 03-32BL1 WP03 Audit Notes: Version Phase: PLAN Tie On Depth: 12,861.33 Vertical Section: Depth From (TVD) -NI-S +EI -W Direction (usft) (usft) (usft) (°) -28.98 0.00 0.00 20.00 12/122018 2:06:15PM Page 2 COMPASS 5000.1 Build 81D ee Company: North America - ALASKA - BP Well 03-32 Project: PBU Mean Sea Level MD Reference: Site: 03 North Reference: True Well: 03-32 Minimum Curvature Database: Wellbore: PLAN 03-32BL1 MWD + IFR + Multi Station W/O Design: 03-32BL1 WP03 Survey Tool Program Data 12/12/2018 MWD+IFR+MS-WOCA From To (usft) (usft) Survey (Wellbore) MWD+IFR+MS-WOCA 60.89 5,198.39 03-32 Srvy 1 GCT MS (03-32) 5,206.00 5,448.49 03-32B Srvy 1 Inc+Trend (03-32B) MWD 5,544.62 10,835.15 03-32B Srvy 2 MWD+IFR+MS (03-32B) 10,905.84 11,447.35 03-328 Srvy 3 MWD+IFR+MS (03-32B) NIS 11,460.11 12,861.33 03-32B Srvy 4 MWD+IFR+MS (03-328) 12,861.33 13965.32 03-32BL1 WP03(PLAN 03-32811) TFace Planned Survey (usft) (usft) (usft) MD Inc Azi TVDSS (usft) 1°1 1°1 (usft) 12,661.33 92.02 272.59 8,582.78 TIP 0.00 626.77 12,876.00 92.11 272.59 8,582.25 KGP 0.00 627.47 12,896.00 90.73 271.43 8,581.76 3 -140.00 627.56 12,900.00 90.30 271.07 6,581.72 12,936.00 86,44 267.83 8,582.74 4 708,617.635 14.00 12,995.23 85.33 259.59 8,587.00 TSGR 708,559.377 14.00 13,000.00 85.24 258.93 8,587.39 13,100.00 83.61 244.96 8,597.15 13,200.00 82.35 230.91 8,609.44 13,268.97 61.75 221.18 8,619.00 TSHU -97.35 536.56 13,300.00 81.55 216.79 8,623.51 13,400.00 81.25 202.63 8,638.54 13,496.00 81.46 189.04 8,853.04 5 -94.26 465.35 12/12/1018 2:06:15PM BP BP Coil Tubing Report Local Coordinate Reference: Well 03-32 TVD Reference: Mean Sea Level MD Reference: KB @ 57.79usft (03-32B) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Tool Name Description GCT -MS Schlumberger GCT multishot INC -TREND Inclinometer +known azi trend MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD - Standard NIS ENy Northing Easting DUB V. Sec TFace (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 626.11 -5,378.24 5,936,867.825 708,692.430 0.00 -1,251.12 0.00 626.77 -5,392.88 5,936,868.072 708,677.772 0.61 -1,255.50 0.00 627.47 -5,412.86 5,936,868.206 708,657.781 9.00 -1,261.68 -140.00 627.56 -5,416.86 5,936,868.180 708,653.781 14.00 -1,262.96 -140.00 627.22 -5,452.83 5,936,866.816 708,617.635 14.00 -1,275.59 -140.00 620.75 -5,511.50 5,936,858.691 708,559.377 14.00 -1,301.73 -98.00 619.87 -5,516.17 5,936,857.672 708,554.731 14.00 -1,304.16 -97.41 589.11 -5,610.56 5,936,824.250 708,461.259 14.00 -1,365.34 -97.35 536.56 -5,694.46 5,936,769.347 708,378.893 14.00 -1,443.41 -95.99 489.21 -5,743.57 5,936,720.621 708,331.146 14.00 -1,504.71 -94.26 465.35 -5,762.88 5,936,696.227 708,312.525 14.00 -1,533.73 -92.91 379.71 -5,811.76 5,936,609.232 708,266.098 14.00 -1,630.93 -92.28 288.62 -5,837.59 5,936,517.455 708,242.863 14.00 -1,725.36 Page 3 COMPASS 5000.1 Build 81D by TVDSS Company: North Amenca - ALASKA - BP Project: PBU Northing Site: 03 (usft) Well: 03-32 (usft) Wellbore: PLAN 03-328Ll Design: 03-32BL1 WP03 Planned Survey 8,653.65 MD Inc 284.72 (usft) (°) 5,936,513.534 13,500.00 80.97 13,600.00 68.96 13,650.22 63.07 TSAD 8,700.00 13,700.00 57.32 13,729.64 54.00 B 8,724.75 13,800.00 54.00 13,853.04 54.02 42N 8,741.47 13,854.74 54.01 42P 5,936,304.683 13,900.00 54.00 13,965.32 54.00 TD at 13965.32 5,936,250.713 Plan Annotations 8,814.00 Measured Vertical Depth Depth (usft) (usft) 12,861.33 8,582.78 12,876.00 8,582.25 12,896.00 8,581.76 12,936.00 8,582.74 13,496.00 8,653.04 13,729.64 8,741.47 13,965.32 8,880.00 BP BP Coil Tubing Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: An TVDSS +N/ -S N/S ENV Northing (°) (usft) 626.11 (usft) (usft) (usft) 188.76 8,653.65 627.47 284.72 -5,838.20 5,936,513.534 181.30 8,679.58 288.62 188.78 -5,846.82 5,936,417.396 177.15 8,700.00 -84.46 142.94 -5,846.22 5,936,371.592 172.54 8,724.75 13.99 99.95 -5,842.39 5,936,328.736 169.53 8,741.47 75.78 -5,838.59 5,936,304.683 157.36 6,782.83 21.33 -5,822.40 5,936,250.713 148.18 8,814.00 -16.79 -5,802.78 5,936,213.172 147.89 8,815.00 -17.95 -5,802.05 5,936,212.026 140.06 8,841.61 .47.54 -5,780.54 5,936,183.062 128.76 8,880.00 -84.46 -5,742.84 5,936,147.227 Local Coordinates +N/ -S +E1 -W (usft) (usft) Comment 626.11 -5,378.24 TIP 626.77 -5,392.88 KOP 627.47 -5,412.86 3 627.22 -5,452.83 4 288.62 -5,837.59 5 75.78 -5,838.59 6 -84.46 -5,742.84 TD at 13965.32 Well 03-32 Mean Sea Level KB @ 57.79usft (03-328) True Minimum Curvature EDM R5K - Alaska PROD - ANCP t Easting DLeg (usft) (°1100usft) 708,242.363 14.00 708,236.472 14.00 708,238.365 13.94 708,243.419 14.06 708,247.904 14.00 708,265.632 13.99 708,286.319 13.99 708,287.080 13.99 708,309.429 13.99 708,348.154 13.99 V. Sec (usft) -1,729.24 -1,822.33 -1,865.21 -1,904.29 -1,925.70 -1,971.33 -2,000.44 -2,001.29 -2,021.73 -2,043.54 TFace -15000 -149.96 -148.01 -146.32 -144.03 -93.59 -92.56 -90.96 -92.43 -93.33 12/12/2018 2:06:15PM Page 4 COMPASS 5000.1 Build 81D 0414l� by North America - ALASKA - BP PBU 03 03-32 PLAN 03-32BL1 03-32BL1 WP03 Anticollision Summary Report 13 December, 2018 r as Company: North America- ALASKA - BP Project: PBU Reference Site: 03 Site Error: 0.0ousn Reference Well: 03-32 Well Error: 0 oousft Reference Wellbore PLAN 03-32BL1 Reference Design: 03-32BL1 WP03 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-32 Mean Sea Level KB @ 57.79usft (03-32B) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP 1 Offset Datum Reference 03-32BL1 WP03 Filter type: NO GLOBAL FILTER: Using user defined selection &littering criteria WARNING: There is hidden light data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 12,861.33 to 13,965.32usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,593.65usft Error Surface: Elliptical Conic Survey Tool Program Date 12/13/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 60.89 5,198.39 03-32 Srvy 1 GCT MS (03-32) GCT -MS Schlumberger GCT multishot 5,206.00 5,448.49 03-32B Srvy1 Inc+Trend(03-32B) INC+TREND Inclinometer +known azi trend 5,544.62 10,835.1503-32B Srvy 2 MWD+IFR+MS(03-32B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,905.84 11,447.3503-32B Srvy3 MWD+IFR+MS(03-32B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 11,460.11 12,861.3303-32B Srvy4 MWD+IFR+MS(03-32B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,861.33 13,965.32 03-32BL1 WP03 (PLAN 03-32BL7) MWD MWD -Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) 03 03-02 - 03-02 - 03-02 12,872.74 11,300.00 532.56 571.11 100.87 Pau - Major Risk 03-16-03-16-03-16 13,424.51 10,675.00 1,240.03 250.84 1,060.81 Pass - Major Risk 03 -16 -03 -16A -03-16A 13,424.51 10,675.00 1,240.03 250.84 1,060.81 Pau - Major Risk 03-19-03-19-03-19 13,936.33 10,800.00 794.77 791.23 26.91 Pass - Major Risk 03-23-03-23-03-23 13,136.33 10,325.00 1,434.23 816.28 709.30 Pass - Major Risk 03 -32 -03 -32B -03-32B 13,174.62 13,225.00 114.27 1.46 114.27 Pass - NOERRORS 12132018 1:19,53PM Page 2 of COMPASS 50001 Build 81D Company: North America - ALASKA - BP Project: PBU Reference Site: 03 Site Error: O.00usft Reference Well: 03-32 Well Error: 0.00usft Reference Wellbore PLAN 03-32BLI Reference Design: 03-32BL1 WP03 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-32 Mean Sea Level KB @ 57.79usft(03-32B) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to KB @ 57.79usft (03-32B) Coordinates are relative to: 03-32 Onset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.63° 1600- e =0 1200- 0 0 0 C• 12 le 800- y m U 0 U cc 400- U Ladder Plot 2500 5000 L E G7LQQ D 10000 12500 15000 Measured Depth (2500 usRAn) $ 0315,03156,03158\/0 -4- 0332,03-326,03326\/0 -A- 03-19,0319,0319V1 $ 0315,0315C,0315CV0 $ 0332,PLAN03-ML2,0332BL2NP03V0 -k- 0320,0320A,0320AV1 $ 0302,0302,03-02\/1 $ 0332,0332,03J2V4 -&- 0320,0320,0320 V1 -} 0303,03-03,03-03V1 ♦- oam'o -33A,03"Vi $ 0323,0323,0323\/3 $ 0307,03- 7A,03-07AV8 iE 0333,1XjMB,(Xl-WBV3 $ 0326,0326,0326V4 $ 03D7,03 -07,03-07V1 -ar 0333,03-33,0333\/2 $ 0321,0321A,0321AV0 -*- 0308,0308,03-08V1 -4- 03M,0333C,0333CV0 -0- 0321,0321,0321 V1 $ 0311,0311,0311 V5 $ 0334,0334,0334V4 $ 0317,03-17,0317V1 -6- 0314,0314BL1,0314BL1 VO $ 0334,0334A,0334AV1 -gar- 03-13,03.13,03.13V1 -11111r 0314,0314,03-14V1 -41� 0334,0334CXX, Plan#4 V2 -111- 0312,PLAN0312A,0312AWP09V0 12/132018 1:19:53PM Page 3 of 3 COMPASS 5000.1 Build 81D PmSke: PBU n:nmmmmexom WELLBORE DETAILS' PLAN 03-32BL1 NB NCENfam TM 3�1• Nw.trwm:l�n 03 0332BL7 CO a wBlc Well: V�ICND)Wa ftn&s,viermn 9>p1.5/®an VeBmIgV0lwaerm'. MmnPM.00 IIIA WMICe3r PIAN 0332BL1 a Pa11:M W�I8Ure: 03328 D,,h "B7 Plan: 0}328L1 WP03 l,ffiII//e1 zl®iml � ��.. @57 y nmaeraxml Theon MD: 12861.33 DNg py,NNll loa Mn..C.. W£LLMTNLS: 0132 .N -B .EFW Nffl EasMg L WtAe Lm Wce 0.00 0.00 5938384900 711080.010 70°13'14.941N 148°16'1586300 West(-)/Eot(+) (200 usWin) 80) SECMNDETAfLS ANNDTATIONS See MD 4g Ad wTVD .WS -&W DNg TF" VSen TwW TW MD Annotalion 1 12861.33 92.02 27259 858278 626.11 537824 900 0.00-1251.12 858278 12861.33 TP 2 12876.00 92.11 772.59 858225 626.77 -539288 0.67 0.00-1255.50 658225 12876.00 NDP 3 12896.00 90.73 277.43 8581.76 627.47 541286_I 3- BU -140.00-1261.68 858136 12896.00 3 4 1293600 8644 267.83 8582.74 627.22 -545283 14A0 -14000-1275.59 8582.74 12936.00 4 5 1349600 81.46 189.04 8653.04 188.62 583759 14.00 .9800-172536 865304 13495.00 5 '3729154 5400 169.53 874147 75.78 583859 14.00 -150.00-1925.70 8741.47 13729.64 6 7 1396532 54.00 128.76 8880.00 -84.46 5742.84 14.00 -W.00.2W354 8880.00 13965.32 TDatl3965.32 West(-)/Eot(+) (200 usWin) 80) 8430 .II 3- BU P 3 now==���'C��i�- BSN TIY West(-)/Eot(+) (200 usWin) 80) 8430 3- BU P 3 BSN TIY I(OY i 8550 'ISBN 86N N 8SW N.313L1 ll 5 8]00 ISNJ 8]50 6 BeoO J2Y 1332M. T3 8850 - 2 716' 893J Tpetl %S J1 � II+WI �] 108n. T 3303 -2350 32N -i)W 3108 -2050 -2003^-1950 -1000 -1650 -1803 4750 iM -1650 -1600^1550 15W -1450 -14W -1350 -1360 -12507I2W X1150 1IW -1050 IWO A50�-9C0 850 -BN -750 -M 450 fi00 -550^-500 -45( Vertical Section at 20.00° (50 usft/in) aze Preload: Pau BNe: 03 Well: 0332 ANTI -COLLISION SETTINGS CCMPANY DETAILS. None AmemN-M M- BP InarpmeBon Moral MD, oriental : 25.00 Calmlacon Memoe. Mmimu ncen,stare 113880 Depth Rape From 1258133 To 1358532 Error System: ISCWSA Nods To SYNByPMn ResuBs Untied By: Came Dwarce'. 1593.85 Seen Method'. Trey. Cylinder NoM Walloons: PLAN03-MLI Reference: Plan: 03-MBL1 WT03(03-32PIAN 0"2BL1) Error Surface: EfflolmlCons Plan: 0332&.7 WPO3 ManInOMebrod: Rules Based c a2 N m 03.328 Ladder Plot 03-32BL 1 WP03 03• From Colour To MD 12861 —13100 13100 13270 13270 113880 13880 13965 WRY PROGRAM North Amedm- ALASI(A BP +mm mm mmn +mmmaammw +mxmxsmwv+ mm+mm+v+ m+x vu.m+x.+.veer w Dean From Nods To SYNByPMn Tocl m 80.89 5198.39 0332 SM1 GCT NIS(O-M) GCT -MS +mamv. a.mm roam 5206.00 5448.49 03-32B Sr,l lnnTmnd(03328) INC -TREND mam+.,m...nx +mamar,mmv+ +mxmw.ma„nn 5544.82 1083515 03328 Srvy 2 NAD+IFR+MS(03328) MWDHFR+MSWDCA +ma mm.mmn roam+. m+<w a.mImmnw wm 1090584 11b7.35 03328 Srvy 3 MM+IFR+MS(() 3=) MWD+IFR+MS­MCA -11.1 11460.11 12861.33 0332BSrvy4MWD+IFR+MS(0132B) MWD+IFR+M3WCCA mm ern,—mmcw .11-1 12861.33 13985.32 W-32KI WP03(PLAN0332BL1) MWD -mm mm mmn +ms mmnmrz+n -mxmv.mvw -o>+ama m+en +m+av+ 03-32B P.pct: PBU Site: 03 WELL DETAILS: M1hCOLLISION SEfnNGS COMMNY DETAILS: NoM Amarice- AtASI(A - BP GrounOLinnn 27.65 IMerpobtlon MemoB: 10,Imemal:25.0 CBI. Mon Methm Miolmum Cuaabrt Well: 03-32 NorMing: 5936394630 Depb Range From: 12861,33 Tp 13865.32 Enor System: ISCWSA Wellbore: PUN03-32BL1 EaeOng714086010 Resulb DmBee By: Cenbe Dist nm'. 159365 Scan Mauro¢ Tim Cylbtler Nath 14M AN 00 -1925 70 Laftce: 70° IT 44.941 N Refeence: O3MBL1 WP03 Enor Surface: EllipticalCOnb Plan' 03-32BL1 WP03 L Longau0e: 148° 16' 18863 W m.amN, atiiaW 1:.I+ Warning MMN1 Rube Based Depth Range: 12861.33 To 13965.32 Fran CObur TOMO 12861 13100 13100 13270 13270 13680 13880 13965 20 BECTIONDETALS O}JN mn VI Sec MD Inc An WD -WS -V-W .,,S iaa.laa. 1 12861.33 9262 27259 8502.78 626.11 4378.24 000 0.00-12%12 2 MIS 92.11 272.59 850225 On" 9392.80 0.61 0.00-1295.26 R$N50 900 -140A0-126169 4 12930.00 W.11 267.83 050274 627.22 8452.83 14.00 -126.00 -127569 5 134%.W 51.45 109.26 0653.04 266.62 5937,59 14.M -IMM-1725.36 6 137A 64 54. W 169.53 074147 7576 -503659 14M AN 00 -1925 70 7 13965.32 54.00 128.76 5880.00 -84.46 4742.84 14.M 8000-M4354 SURY RWRPN w Cenbe Separation [10 usMn] m.amN, atiiaW 1:.I+ BECTIONDETALS O}JN mn VI Sec MD Inc An WD -WS -V-W Dleg TFace VSed 1 12861.33 9262 27259 8502.78 626.11 4378.24 000 0.00-12%12 2 MIS 92.11 272.59 850225 On" 9392.80 0.61 0.00-1295.26 3 12696.[0 50.73 27143 05817,8 62T47 5412.66 900 -140A0-126169 4 12930.00 W.11 267.83 050274 627.22 8452.83 14.00 -126.00 -127569 5 134%.W 51.45 109.26 0653.04 266.62 5937,59 14.M -IMM-1725.36 6 137A 64 54. W 169.53 074147 7576 -503659 14M AN 00 -1925 70 7 13965.32 54.00 128.76 5880.00 -84.46 4742.84 14.M 8000-M4354 SURY RWRPN DerahFmm Degh Ta S."Mi n T.1 60.09 5190.39 0342 Srvy 1 GCT MS 103321 GCT -MS Smw 544849W82B Srvy 1 lnc Tre 10382B) M.TRENO 5544.62 10035.15 W928 SM 2 MBDNFReMS(OMM) MWDHFR+MSWOCA 1D90S.Ba 11.735 03MB Srvy 3 MWONFRVMS(03 13) MW IM -MS CA 11460.11 1286133 03828 Srvy 4 MLLDNFR+MS(03R0) MM+IM-MSWCA 486133 13965.32 0382BL1 %h1`03 (P 0382111,1) MND Depth Range: 12861.33 To 13965.32 Klmulh Som Nonh (•)w CeMm b Cere Sege fton I30 wMn) O}JN mn VI 2621 aI ON,MX'M RmNw .1. ossa Daze os�ays asv, asva. rovaW osn, al.z, ronv� v. wu N.mm r, amn, ms.as ew ms m12 R 12A vaow a. R.a mazeum azv4m roe mzww 12 M12I rov.roar,0osa.W rota..MW m 1Am31Aw ossa mMew mza,..V1 m.nu vmm aR Os��Mw mM mIDW 9 w nYN.MN.mNV< mMm%. N]aW ME ProHN: PBU wme mn�.wn WELLBORE DETAILS: PLAN 03-32BLI fEiHtB2EINFIXMNiKN Mq.e:xm.�iii 9M: W nemmearen 03-a2BL1 G.aareu":Pe.--VMN32. iueNVU Well: 0332 s.ansems.i Vmm0vgeuxam. nwns.Lew WWConr. PLAN W-02BL1 °°'"d°B° Ob32B seam Nsladamre: Sld-(O.aoN, e0oE1 PYn: W32BL1 WPWPIuabWRMD Tie an MD' 12881.33 I.I�a.ea 0su 8ek`ena: rce�n.n.nlmasel CSlolemnfMmm ltinmmGr9ua Mean See Level North America - ALASKA - BP PBU 03 03-32 PLAN 03-3281-1 03-32131-1 WP03 Plus 500ft MD AOGCC Offset Well Report 12 December, 2018 RE Company: North America - ALASKA - BP Project: PBU Reference Site: 03 Site Error: O.00usft Reference Well: 03-32 Well Error: O.00usft Reference Wellbore PLAN 03-32BL1 Reference Design: 03-32BL1 WP03 Plus 500ft MD BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-32 Mean Sea Level KS @ 57.79usft (03-32B) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 03-32BL1 WP03 Plus 500ft MD From Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria WARNING. There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,643.65usft Error Surface: Elliptical Conic Survey Tool Program Date 12/12/2018 From To (usft) (usft) Survey (Wellbore) 6089 5,198.39 03-32 Srvy 1 GCT MS (03-32) 5,206.00 5,448.49 03-32B Sivy 1 Inc+Trend (03-32B) 5,544.62 10,835.15 03-32B Srvy 2 MWD+IFR+MS (03-32B) 10,905.84 11,447.35 03-32B Srvy3 MWD+IFR+MS(03-328) 11,460.11 12,861.33 03-32B Srvy4 MWD+IFR+MS(03-32B) 12,861.33 14,465.32 03-32811 WP03 Plus 500ft MD (PLAN 03 Tool Name Description GCT -MS Schlumberger GCT multishot INC+TREND Inclinometer +known azi trend MWD+IFR+MS-WOCA MWD+IFR +Multi Station W/O Crustal MWD+IFR+MS-WOCA MIND + IFR +Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD -Standard 12/12/2018 2:52: 15PM Page 2 of 269 COMPASS 5000.1 Build 81D 03-02 - 03-02 - 03-02 12,633.49 BP 362.16 by 6,659.74 Anticollision Report 249.02 Company: North Amenca- ALASKA - BP Local Coordinate Reference: Well 03-32 Project: PBU TVD Reference: Mean Sea Level Reference Site: 03 MD Reference: KB Q 57.79usft (03-32B) Site Error: O.00usft North Reference True Reference Well: 03-32 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore PLAN 03-32BL1 Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: 03-32BL1 WP03 Plus 500ft MO Offset TVD Reference: Offset Datum Summary 1,913.30 1,925.00 632.41 03-13 - 03-13 - 03-13 3,251.07 Reference Offset Centre to 03-14 - 03-14 - 03-14 3,696.57 Measured Measured Centre Site Name 3,682.68 Depth Depth Distance Offset Well - Wellbore Design (usft) (usft) (usft) 03-02 - 03-02 - 03-02 12,633.49 10,875.00 362.16 03-03 - 03-03 - 03-03 6,659.74 6,250.00 249.02 03-04 - 03-04 - 03-04 5,267.54 5,100.00 640.00 03-05 - 03-05 - 03-05 4,688.77 4,600.00 278.82 03-06 - 03-06 - 03-06 4,381.94 4,400.00 103.69 03-07 - 03-07 - 03-07 4,148.09 4,075.00 529.32 03 -07 -03 -07A -03-07A 4,150.85 4,075.00 529.56 03-08 - 03-08 - 03-08 4,254.83 4,175.00 334.56 03-11-03-11-03-11 3,655.47 3,725.00 9.22 03-12-03-12-03-12 1,913.30 1,925.00 632.41 03 -12 -PLAN 03 -12A -03-12A WP09 1,913.30 1,925.00 632.41 03-13 - 03-13 - 03-13 3,251.07 3,275.00 331.41 03-14 - 03-14 - 03-14 3,696.57 3,675.00 118.59 03 -14 -03 -14A -03-14A 3,682.68 3,650.00 118.23 03-14 - 03-148 - 03-148 3,682.68 3,650.00 118.23 03-14 - 03-14BL1 - 03A4BL7 3,682.68 3,650.00 118.23 D3 -15-03-15B-03-158 8,600.00 7,825.00 354.90 D3 -15-03-15C-0&1 SC 8,600.00 7,625.00 354.90 [13-16 - 03-16 - 03-16 13,425.00 10,675.00 1,240.03 [13-16 - 03A6A - 03-16A 13,425.00 10,675.00 1,240.03 D3-17 - 03-17 - 03-17 9,181.54 7,900.00 203.34 03-19 - 03-19 - 03-19 13,925.00 10,700.00 801.93 03-20 - 03-20 - 03-20 8,341.00 7,225.00 939.37 03 -20 -03 -20A -03-20A 8,337.52 7,200.00 938.09 )3-21-03-21-03-21 10,965.02 9,200.00 1,114.64 D3 -21 -03 -21A -03-21A 10,968.52 9,200.00 1,114.62 33-23 - 03.23 - 03-23 13,150.00 10,450.00 1,450.91 33-26 - 03-26 - 03-26 3,973.12 4,100.00 233.08 )3-29 - 03-29 - 03-29 9,745.00 8,375.00 833.91 )3 -29 -03 -29A -03-29A 9,745.00 8,375.00 833.91 )3-31-03-31-03-31 1,995.54 2,000.00 120.30 )3 -31 -03 -31A -03-31A 1,995.54 2,000.00 120.30 )3-32 - 03-32 - 03-32 5,515.60 5,525.00 35.06 )3 -32 -03 -32A -03-32A 5,523.90 5,525.00 37.02 )3-32 - 03-32B - 03-32B 13,175.00 13,225.00 114.27 33-32 - PLAN 03-32BL1 - 03-32BL1 WP03 13,965.32 13,985.32 0.00 )3 -32 -PLAN 03-32BL2-03-32BL2 WP03 11,594.74 12,100.00 809.98 33-33 - 03-33 - 03-33 2,741.82 2,750.00 120.61 )3-33 - 03-33A - 03-33A 2,741.82 2,750.00 120.60 33-33 - 03-338 - 03-338 2,747.01 2,750.00 120.66 )3-33 - 03-33C - 03-33C 2,747.01 2,750.00 120.66 )334 - 03-34 - 03-34 2,292.39 2,300.00 236.23 )334 -03 -34A -03-34A 2,292.39 2,300.00 236.23 )3-34 - 03-348 - 03-348 2,300.83 2,300.00 236.32 )3-34 - 03-34CXX - Plan M4 2,292.39 2,300.00 236.23 )3-37-03-37-03-37 9,934.75 7,625.00 1,377.41 12/122018 2:52: 15PM Page 3 of 269 COMPASS 5000.1 Build 81D E= C1w WELLHEAD= MCEVOY ACTUATOR= BAKER KB. E -EV = 67 BF. FLEV = 30.7 KOP= 2891' Aix Angle = 115' Q 11161' Datum AD = 15718' Datum ND= 8588' 13-3/8' CSG, 72N. L-80. D = 12.347- 2614' Minimum ID = 3.726" @ 10742' 4-1/2" HES XN NIPPLE 19-5/8- VWPSTOCK (02170/09) --I 6206' 9-5/8• CSG. 478, L-80. D=8.681- -6206' SAFETY NOTES ^-4-112- CHRDME TBG, LNR 03-32B 10892' "ORIG WELL 03-32A NOT SHOWN BELOW WHIPSTOCK" 997Y 4-12' I -ES X NNP. D = 3.813' PERFORATION SUMMARY Rff LOG: SLB MND on 02-26-09 ANGLE AT TOP PERF: 50' @ 10895' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE 2-718' 6 10895 - 10925 O 11/07/16 2-7/8' 6 11630 - 11662 O 05V14/18 2-718' 6 11659 - 11691 O 05/14/18 2-718' 6 11688 - 11720 O OS13118 2-7/8' 6 11720 - 11750 O 05V13/18 2-718' 6 12130 - 12250 O 03/07109 2-718' 6 12380 - 12550 O 03/07/09 2-7/8' 6 12690 - 12810 C 03107/09 2-7/8' 6 13595 - 14167 C 03/07/09 2-7/8' 6 14240- 14454 C 03/07/09 2-7/8' 6 14673 - 15230 C 03107/09 2-7/8' 6 15294 - 15600 C 03107/09 bpf, D = 3.958' --j 10764' BTGM, .0383 bpf, D= 6.276' I -i 1 12' LNR, 12.68, 13 -CR -80 VAM TOP GAS LFT MANDRELS ST AD I TVD I DEV I TYPE I VLV I LATCH PORF DATE 4 3504 3477 20 AMG DOAE RK 16 03/14/18 3 5788 5516 22 KBG2 SO BK 20 03/14/18 2 7909 7020 60 KBG2 DIY BK 00 DRI-GDRAFTOORRECIDNS 10611 8436 46 KBG2 D SK 0 14118 PBTD 1-I 15718' 4328' 9-5/8' X 7' HRD ZXP LTP w /TEBACK SLV, D = 610' 4343' 9-5/8' X 7' BKR HMC LNR HGR. D = 6.' hQLOIfT WNDOW (03-32B) 5206' - 5223' DATE REV BY COMAIEMTS DATE REV BY COAMENTS 03113186 ORIGINAL COMPLETION 11/08/16 ARD/JW ADIPERFS(11107/16) 05106194 SILEFRACKIWORKOVER 07/12117 JPKIJAO GLV CIO(07110117) 03108109 N9ES SIDETRACK (03-328) 03/20/18 CJWJAD GLV C/O (03/14/18) 03/10/09 PJC DRLG DRAFT CORRECTIONS 05t22/18 ,KF/JAD SEF CIBFfADPERFS 0525/09 SWC/PJC GLV CIO (04/02109) 06/22/10 RCIAD DRI-GDRAFTOORRECIDNS 1677' -j7- X 4-12' BKR S-3 PKR- D = 3.870- 10711' 4-12' FES X —NIP -1D -=-3-8-13--j 10742' 4-12' HES XN NP, D -737-72-5T] 10743' 7' X 5' FRDZXPLTPw/TEBACK SLV, D=5.560' 70764' 4-12'WL6G, D=3.956' 10765'7' X S FRD FMc LNR HGF{ ll 4.440' 10776' Y X 4-12' XO, D = 3.920' BKR CIBP PRUDHOE BAY UNIT WELL. 03-328 PSMT No: 42090050 APINb: 50-029-21141-02-00 SEC 11, T10N1 R15E 337 FSL 8 796' FWL BP Exploration (Alaska) VYH.LFFAD= W1>rk/OY ACRJATOR= BAKERC KB. ELEV = 67 BF. ELEV = 30.7' KOP= Wax Angle = - wawWD= 2891' 115' @ 11161' _-- 15718' ohm TVD = 8588' 13-3/8• CSG. 7211. L-00, D= 12.347• 03-s2B, L1 & L2 Minimum ID = 3.726" @ 10742' 4-1/2" HES XN NIPPLE 19.5/8' V*WSTOCK (02/10009) — 6206' 9-5/8" CSG, 470, L-80, D=8.681' —6208' n9arnAmKaAsllnr WLOO SB YKOan62-2669 AK ATTOPi 9•®16695 Ill: Ills! R6atctm®la 666461 11.1216,41.1 �- 9i MBNAL pv Opw m 2-]-7 R 8 10695-10925 o O UWn I6 2-7iE' 6 116E-11� O 05HN6 2-]T 6 11666 - 11691 0 661 o 2-7W 6 f16m-I1m O MIN8 2-T? 6 11T10-11750 0 w1wa 2-]a' 6 121]0-12258 O 03 m 2-7W 6 12m0 -126m O 0307.09 2-75 6 1AM. 12610 c 030]09 2-7R 6 13m6-14167 c 03A m 2 -]IS 6 142q-14451 c 0307.09 2-7.Q 6 14673-IVM C 03ATm 2-w 6 1991-15600 c M7M 4-Irr Iftnobore VW*SWu�cASH��jj 11.1216,41.1 �- {04��6Y. �+•�y J ,1. 6�i 7L It f TYPE VLV 370• Deployment SLV 11400' 14-12" Monohore VNlostock I 412 LW 12(K 13CR80VAM-lUR..01MW. D=3958' 16788 SAFETY NOTES: -4-1/2" CHFDM E TBG, LNR 8 MPPLES"""WELL ANGLE> 70' 10892'"""ORIG WELL 8 03-32A NOT SHOWN BELOW WHIPSTOCK"- a_�n•uxvA® m=aal a - GAS LFT VAMIWLS ST MJ TVD DEV TYPE VLV LATCH PORT DATE 4 3504 3477 20 MNG DOW RK 16 03/14/18 3 5788 5516 22 KBG2 SO BK 20 03!14/18 2 7909 7020 60 KBG2 OM1' BK 0 03114/18 1 10611 8436 46 KBG2 CW BK 0 03/14/18 J -5remZXP UP w/TEBACK SL9V. D "X T H = 620' 4343 X r 9KR t -M. LNR MGF( U-5. MLLOUr WIDOW (03.328) 5206' - 522T DATE REV BY CORRBGS DATE FEV BY COMVBJ)S 03/13186 ORKANAL COMPLETION 11/08116 MDJM) AOFBIFS(11/07/16) 0510604 SIDETRACWWORKDVHt 07112117 JFK/JMJ GLV CIO (07110117) 0310&09 N9ES SIDETRACK (0-32B) 03/20/18 CJNJM) GLV CIO (03/14118) 03/10/09 PJC DTiG ORAFT COMMUIOS 05/22/18 JCF/JMJ SETCBRADUlFS M75/09 SWCIPJC GLV C/O (04102/09) 0622/10 FriJMJ DRLGOFWFTCOfa7ECTXXS D - 3.813' FES XN NP. D = SLV, D= 5.560- 41/2• wLEG, D= 3.85 7' X 5' HRD HMC LNR HCR D = 4.440- 5'X4 -112"X0. D=3.1 12-7/8". 6.4#. 1301-80 I PRUCHOE BAY LMT WELL 03328 PER W M: IM90050 API N6: 50-029-21141-02-00 SEC 11, T1 OR RI 5E. 33Z FSL 8 796' FWL BP Exploration (Alaska) Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 Quick Test Sub to Otis -1.1 ft = --' - Top of 7" Otis I 0.0 ft �COR2 Rig's Onp Pan Distances from top of riser Excluding quick -test sub 7-1116" 6k Flange x 7" Otis Box Top of Annular 6.0 ft Hydril 7 1/16" Top of Annular Element 6.7ft Annular Bottom Annular 8.0 H � CL Blind/Shears 9.3H CL 2-318" Pipe/Slips B1 B2 B3 Kill Line Pal Cu 2-3/8" x 3-1/2" VERB 12.6 ft 0 CL 2-3/8" Pipe/Slips 13.4 k CL of Top Swab 16.0 H �- Swab T1 CL of Flow Cross 17.4 H FIA CL of Master 18.8 ftLDS Los O Ground Level 0 T2 Choke Line Test Pump Hose PBU 03-32BL1 Permit 218-169 Coordinate Conversion Check (NAD 27 Lat/Long to NAD 27 ASP) onvert from: • LLh Enter let -Ion in decimal degrees Lat 70.2291502778 Lon -148.2719063889 or degrees -minutes -seconds Lat N 70-13-44.94100 Lon W 148-16-18.86300 or drag map marker to a location of interest Ellipsoid Height (m) SPC UTM XYZ Enter a longitude as shown in DDDMMSS ssssss format Input datum NAD27 I Output datum Dont see a datum in the list? Click here to learn more. overted coordinates will he in output datum. xport Results to M:J�M * t ®�,� LLh SrcLat 70 22915D2778 N7013" 94100 DestLat 70.22915D2778 N701344.94100 Siglat ±0.000000 (aresec) SrcLon -148.2719063889 W148161&86300 DestLon -148.2719063889 W1481618,86300 Siglon A 000000 (aresec) SrcEht NIA SPC Zone AK 4-5004 Northing (m) 1,809,416.710 Northing 5.936,394 656 (usft) Northing (ift) 5,936,406.529 Easting (m) 217,653-853 Easting 714,086 016 (usft) Easting (ift) 714,087.444 Convergence 01 3734.62 (dms) Scale factor 0.99995207 NAD27 UTM (m) Zone 6 Northing 7,791,754.750 Easting 451.984.112 Convergence -011149.03 (dms) Scale factor 0.99962820 Combined NIA factor USNG Le" I Sources XYZ (m) X NIA Y NIA Z NIA USNG 6WVC5198491754 AOGCC December 18, 2018 TRANSMITTAL LETTER CHECKLIST WELL NAME: �1 �3 Z��� PTD: Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL:, Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter ECK OPTIONS TEXT FOR APPROVAL LETTER /MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. 21,�61-dk'S API No. 50-02 7_f/rid U� k (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. )etween ou-oy In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_ from records, data and logs acquired for well name on ermit . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator to the spacing exception that may assumes the liability of any protest occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample 0' ample aand ls fromor Cham 10' l s are first can lit saml le inow tervals throng tar eto ones.ere Please note the following special condition of this permit: testing of coal bed methane is not allowed for Non -Conventional production or production (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on the AOGCC water quality and quantity. (Comnanv Name) must contact to obtain advance approval of such water well testin ro am. the AOGCC to specify types of Regulation 20 AAC 25.071(a) authorizes In to the well logging program proposed by well logs to be run. addition (Company Name) in the attached application, the following well logs are also required for this well: Well Logging ✓ Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAYS NIT0332BL1____ . ---Program DEV _ Well bore seg ❑ I PTD#:2181690 Company _B_ P EXPLORATIONSAI ASKA) INC __ _ Initial Class/Type DE_V / PEND__GeoArea 890 Unit 11650 On/Off Shore On __ Annular Disposal ❑ Administration 17 1 2 3 4 5 6 7 8 9 10 Appr Date 11 12 SFD 12/18/2018 13 14 I15 16 18 Engineering 19 20 21 22 23 24 25 26 27 Appr Date ( 28 29 (h G -R lZ)l4/1x30 31 32 Geology Appr Date SFD 12/18/2018 Nonconven, gas contormsto A531,U5.U3UQ.1.A),g.Z.A-U) Perm it fee attached - - - - - - - - - - ------ - - - - - _ _ _ _..._ NA Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ Surface Location lies within ADL0028327; Top Prod Int & TD lie within ADL0028328... Unique well. name and number - - - - - - - - - - - - - - ... Yes Well located in.a defined. pool.. _ _ _ ... _ _ Yes ..... _ _ PRUDHOE BAY, PRUDHOE.OIL POOL -64015, governed by CO 341E Well located proper distance from drilling unit.boundary..... _ .... Yes _ _ CO 341F, Rule 2:. There shall be no restrictions. as to well spacingexceptthal.no pay shall be Well located proper distance_from other wells_ _ _ .. _ _ _ _ _ _ _ Yes .... _ _ _ opened_ in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to Sufficient acreage. available indrillingunit....... _ ...... Yes _ _ CO 341 F, Rule 2.- If. deviated, is, wellbore platincluded.. _ _ _ _ ... - - - - .. _ _ Yes - Operator only affected party- - - - - - -- - - - - - - ... _ _ Yes Operator has appropriate_ bond in force _ _ _ _ Yes ... Permit can be issued without conservation order _ _ _ _ ..... - Yes Permit can be issued without administrativeapproval_ _ _ _ _ _ _ _ _ _ _ _ Yes Can permit be approved before 15 -day wait . .. . . . . . . . .... _ _ _ ... _ _ Yes Well located within area and -strata authorized by. Injection Order # (put 10# in. comments). (For. NA_- AII wellswithin114_mile area of review identified (For service well only) _ .... - - - - _ NA _ _ ... - - _ _ ... Pre -produced injector duration of pre production less than 3 months. (For service well only) .. NA Conductor skiing -provided ______ _ _ _ _ _ .. - _ _ _ NA . _ . CTD sidetrack from. existing 4 1/2". production liner _ Surface casing protects all known USDWs . _ _ _ _ _ NA_ - - _ ... _ CTD sidetrack from existing 4-1/2" production liner - GMT vol adequate to circutate.on conductor _& surf csg . . . . ......... . . . . . . . ... NA. _ _ . _ _ _ . CTD sidetrack from existing 4-1/2" production liner .... . CMT. vol adequate to tie-in long string to.surf csg. . . . ..... . . . . . ... - _ _ _ _ _ _ NA ..... - _ CTD sidetrack from existing 4-1/2". production liner - - - - CMT will cover all known productive horizons _ ...... Yes Casing designs adequate for CJ, BA permafrost--- - - - - - - - -- --- - - - - - - - - Yes _ _ _ _ _ _ _ CTD sidetrack from existing 4-1/2".production liner. . Adequate tankage.or reserve pit .. . . . . . . . . . . . ... _ _ _ - - - Yes . .. - - - CDR 2 will be utilized in ongoing CTD drill ng operations. If. a. re -drill., has_a 10-403 for abandonment been approved - - ---- - - - - - - - - - - - - NA Adequate wellbore separation proposed _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ ______ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ No anlicollision issues, BP risk criteria are all passed.. If diverter required, does it meet_ regulations--- - - - - - - - - - ---- - - - - - ---- - - - NA- CTD sidetrack from existing 4-1t2" production liner Drilling fluid, program schematic & equip list adequate_ __ _ _ _ _ _ _ _ ___ _ _ _ . _ . Yes _ _ _ All operations performed withoverbalancedfluid _ BOPEs, do they meet regulation . ... . . . . .... . . . .. . - - - - - - - . Yes- BOPE.press rating appropriate; test to (put psig in comments)_ - _ ... _ _ .... _ _ Yes 5000 psi BOPE will be. pressure tested to 3500 psi Choke manifold complies w/API. RP -53 (May 84)- - - --- - - - - - --- - - - - - - - Yes Work will occur without operation shutdown . .. . . . . . . . . ........ . . . ... . . . Yes Is presence. of H2$ gas probable.. _ _ _ .. Yes ... _ _ _ _ Standard BP H2S monitoring wilt be. in place_ .Mechanical condition of wells within AOR verified (Forservice well only) ... _ _ _ . _ NA .. - - - - _ this weU is a.producer.Permit can be issued w/o hydrogen sulfide measures _ ....... _ _ ... - - - _ No ....... DS 03 wells are. 1-12S -bearing, H2S measures.are required._ Data. presented on potential overpressure zones ... _ _ _ _ _ _ _ _ . Yes _ _ _ _ Planned mud weights appearadequate to control the. operator's forecast of estimated pore pressures._ _ ... . Seismic analysis. of shallow gas.zones.... . . . . ..... . . ....... _ _ _ _ _ _ NA.. _ _ _ Should higher pore pressures be encountered, SP has immediate access to nearby fluidmixingfacilities. Seabed condition survey (if off -shore) .. . . . . ........ . . . . . . ...... . . ...NA .. Managed pressure drilling techniques may be utilized to improve hole stability. _ .. Contact name/phone for weekly_ progress reports [exploratory only] .. . . . . . ........ . NA Geologic Engineering is Date: Date Date Commissioner: Date . omm r � LSg z�zn ke,