Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-045CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Producer 15-27 ( #219045) TTP Set Tubing & PC leak Date:Saturday, December 31, 2022 11:53:16 AM Attachments:image001.png PBU 15-27B (PTD 2190450) Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Friday, December 30, 2022 8:26 AM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com> Subject: NOT OPERABLE: Producer 15-27 ( #219045) TTP Set Tubing & PC leak Mr. Regg, Producer 15-27 (PTD #219045) was identified with TxIA communication and sustained casing pressure on 12/04/22 after failing TIFL. The well has been secured with a tubing plug at 11332’ and a failing CMIT-TxIA was performed on 12/13/22. Subsequent leak detection logging identified TxIA + PC leak. At this time, the well is classified as NOT OPERABLE and will remain shut in until well barriers are restored. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Tuesday, December 6, 2022 11:09 AM To: jim.regg@alaska.gov Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Producer 15-27B (PTD #219045) TIFL Failed, Exceeded IA MOASP Mr. Regg, Producer 15-27 (PTD #219045) was reported by operations to have rapidly increasing IA pressure on 12/4/22 and the well was shut-in. The well then failed a TIFL later on 12/4/22 indicating afailure of one or more barriers. IA pressure exceeded MOASP at 2373 psi on 12/4/22. The well is now classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan Forward: 1. Slickline: Set DGLV 2. DHD: Re-TIFL 3. Further diagnostics as necessary Please respond with any questions. Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Engineer Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you arehereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly andpermanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data.No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. DATA SUBMITTAL COMPLIANCE REPORT 9120/2019 Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-276 Operator BP Exploration (Alaska) Inc. API No. 50-029-22243-02-00 MD 16512 TVD 8704 Completion Date 6/24/2019 Completion Status 1 -OIL Current Status 1-0I1- UIC No REQUIRED INFORMATION / Mud Log No ✓ Samples No Directional Survey Yes t/ DATA INFORMATION List of Logs Obtained: MWD/GR/RES, GR/CCURPM Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data ED C 30962 Digital Data (from Master Well Data/Logs) Log Log Run Interval OH/ Scale Media No Start Stop CH Received Comments 14403 16512 7/8/2019 Electronic Data Set, Filename: 15- 27B LWD FINAL FIELD COMPOSITE 06JUN2 AOGCC Page] of 3 Friday, September 20, 2019 019_BHI_CTK.las 7/8/2019 Electronic File: 15- 27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B HI_CTK.cgm 7/8/2019 Electronic File: 15- 27B_GR_Res _ 21JUN2019_TVDSS_FINAL_FIEL D_BHI_CTK.cgm 7/8/2019 Electronic File: 15- 27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B HI_CTK.pdf 7/8/2019 Electronic File: 15- 27B_GR Res_ 21JUN2019_TVDSS_FINAL_FIEL D_BHI_CTK.pdf 7/8/2019 Electronic File: 15-27B Final Field Surveys.csv 7/8/2019 Electronic File: 15-278 Final Field Surveys.xlsx 7/8/2019 Electronic File: 15-27B Final Surveys.pdf 7/8/2019 Electronic File: 15-27B Final Surveys.txt 7/8/2019 Electronic File: 15- 27B_25_tapescan_BHI CTK.txt 7/8/2019 Electronic File: 15-27B_5_tapescan_BHI_CTK.txt 7/8/2019 Electronic File: 15-27B_output.tap 7/8/2019 Electronic File: 15- 27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B HI CTK.tif AOGCC Page] of 3 Friday, September 20, 2019 DATA SUBMITTAL COMPLIANCE REPORT 9/20/2019 Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-27B Operator BP Exploration (Alaska) Inc. API No 50-029-22243-02-00 MD 16512 TVD 8704 Completion Date 6/24/2019 ED C 30962 Digital Data ED C 30962 Log Header Scans ED C 31172 Digital Data ED C 31172 Digital Data ED C 31172 Digital Data ED C 31172 Digital Data ED C 31172 Digital Data ED C 31172 Digital Data ED C 31172 Log Header Scans Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report 10 Production Test Information Y /MAI Geologic Markers/Tops AOGCC Interval Start Stop Completion Status 1 -OIL Current Status I.OIL UIC No 7/8/2019 Electronic File: 15- 27B_GR_Res _ 21JUN2019_TVDSS_FINAL_FIEL D_BHI_CTK.tif 0 0 2190450 PRUDHOE BAY UNIT 15-27B LOG HEADERS 11200 16466 9/4/2019 Electronic Data Set, Filename: 15- 27B_MRPM_ PNC3D_RAW_PASS0I UP_22JUL2 019_BHl.las 12100 12300 9/4/2019 Electronic Data Set Filename 15 - Directional / Inclination Data Mechanical Integrity Test InformationlYY INA Daily Operations Summary I Y ) Page 2 of 3 Mud Logs, Image Files, Digital Data Y Core Chips Y / Composite Logs, Image, Data FilesY Core Photographs Y / Cuttings Samples Y NA Laboratory Analyses Y NA Friday, September 20, 2019 27B_MRPM_PNC3D_RAW_PASS02UP_22JUL2 019 BHI.las 9/4/2019 Electronic File: 15- 27B_MRPM_ PNC3D_RAW_PASS0IUP_22JUL2 019 BHI.dlis 9/4/2019 Electronic File: 15- 27B_MRPM_PNC3D_RAW_PASS02UP_22JUL2 019 BHI.dlis 9/4/2019 Electronic File: 15- 27B_MRPM_PNC3D_RAW_22JUL2019_BHl.met a 9/4/2019 Electronic File: 15- 27B_MRPM_PNC3D_RAW _22J U L2019_B H I.P D F 0 0 2190450 PRUDHOE BAY UNIT 15-27B LOG HEADERS Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data Y Core Chips Y / Composite Logs, Image, Data FilesY Core Photographs Y / Cuttings Samples Y NA Laboratory Analyses Y NA Friday, September 20, 2019 DATA SUBMITTAL COMPLIANCE REPORT 9/10/2019 Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-27B Operator BP Exploration (Alaska) Inc. MD 16512 TVD 8704 Completion Date 6/24/2019 Completion Status 1-0I1 Current Status 1-011- COMPLIANCE -OILCOMPLIANCE HISTORY Completion Date: 6/24/2019 Release Date: 4/12/2019 Description Date Comments Comments: Compliance Reviewed By: API No. 50-029.22243-02-00 Date: It <? UIC No AOGC'C Page 3 of 3 Friday, September 20, 2019 BA M 0 PRINT DISTRIBUTION LIST i UGHEB a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 15-27B FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Frank Schwarzrock EMAIL frank. schwarzrock(a)bhge.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION 4 BP North Slope. FOA, PBOC. PRB-20 (Office 109) D&C Wells Project Aids Agatha Burka & Barbara Glassmakcr 900 E. Benson Blvd, Anchorage, Alaska 99508 I'm 219045 31172 Ise sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, 1-112-1 1 E. Benson Blvd. :horage, Alaska 99505 or AKGDMINTERNAL@bp.com LOG TYPE RPM:PNC3D LOG DATE July 22, 2019 TODAYS DATE September 1, 2019 Revision Details: Rev. Requested by: -- FIELD/ FINALCD/DVD FINAL PRELIM I las, dlis, PDF, META, (CGM, SURVEY REPORT LOGS LOGS Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES 1# OF COPIES V 4 jj 2 ConocoPhillips Alaska Inc. RECEIVED i Attn: Ricky Elgarico SEP 0 4 2019 ATO 3-344 788 G Street AOGCC Anchorage. AK 99501 3 EsxonMobil, Alaska Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC '1 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas •`. Attn: Garret Brown 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter 0 TOTALS FOR THIS PAGE: 0 1 4 0 0 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Reddil ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set LTP 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ S. Permit to Drill Number 219-045 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Straligraphic ❑ Service ❑ 1 6. API Number: 50-029-22243-02-00 7. Property Designation (Lease Number): AOL 028306 & 028303 S. Well Name and Number: PBU 15-27B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 16512 feet Plugs measured None feet true vertical 8704 feet Junk measured None feet Effective Depth: measured 16458 feet Packer measured 11165 feet true vertical 8706 feet Packer true vertical 7960 feet Casing: Length. Size: MD: TVD: Burst: Collapse. Conductor 80 20" 29-109 29-109 1490 470 Surface 3457 13-3/8" 29-3486 29-3485 3450/5020 1950/2260 Intermediate 3784 9-5/8" 26-3810 26-3809 6870 4760 Liner 7788 7" 3658-11446 3657-8191 7240 5410 Liner 3132 4-1/2" 11271-14403 8047-8717 8430 7500 Liner 5135 2-7/8" x 2-3/8" 11329 - 16464 8095-8705 11199 11776 Perforation Depth: Measured depth: 15457 - 16433 feet True vertical depth: 8726-8706 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 24-11279 24-8054 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 11165 7960 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 1818 7700 5 0 1004 14. Attachments: (re uired,r2o nnc 25.07025.071, s 25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ Sun dry Number or N/A if C.O. Exempt: 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. MA WA Authorized Name: Brown, Don L. Contact Name: Brown, Don L. Authorized Tide: Petroleum Engineer Contact Email: bmwd2ABP.com t/�'�1 _ - Authorized Signature: 061-1 Ce t"e �r 1 Date: g 9 c� Contact Phone: +1 9075644675 Form 10.404 Revised 04/2017 / 01 1 MMSIF'JAUG 2 12019 Submit Original Only Daily Report of Well Operations PBU 15-27B 7/23/2019 'WELL S/I ON ARRIVAL*** (Post CTD) UNABLE TO PASS DEPLOYMENT SLV AT 11,325' SLM W/ 2.25" x 10' BAILER. DRIFT TO DEVIATION AT 12,252' SLM W/ 2.00" CENT, 1.75" x 10' BAILER (No issues). RAN READ 24 ARM CALIPER FROM 12,275' SLM TO SURFACE (Good data). RAN DUMMY 45KB PACKER W/ DUMMY PTSA TO 11,325' SLM (Ring on brass TT lugs). '*'JOB IN PROGRESS, CONTINUED ON 7/24/19 WSR*** **'CONTINUED FROM 7/23/19 WSR*'* (Post CTD) SET BAKER 45KB PACKER, NS PTSA W/2.313" XX RSG AT 11,322'M (11,323' MOE). ****OAL = 10.99'- Min id = 2.313" AT X -NIPPLE IN PTSA AT 11,332' MD**** LRS PERFORMED SUCCESSFUL PRESSURE TEST ON LTP TO 2560 PSI. SET 4-1/2" X -CATCHER IN 4-1/2" X -NIPPLE AT 11,191' SLM / 11,196' MD. PULL BK-DGLV FROM ST #2 (7,778' MD) & RK-DGLV FROM ST #3 (3,549' MD). SET RK-LGLV AT ST #3 (3,549' MD) & BK-OGLV AT ST #2 (7,778' MD). CURRENTLY RIH W/ 4-1/2" GR TO PULL X -CATCHER SUB AT 11,196' MD. 7/24/2019 ***JOB IN PROGRESS, CONTINUED ON 7/25/19 WSR*** '**CONTINUED FROM 7/24/19 WSR*'* (Post CTD) PULL EMPTY 4-1/2" X -CATCHER SUB FROM 4-1/2" X -NIPPLE AT 11,196' MD. EQUALIZE & PULL 2-7/8" XX -RSG BODY FROM 2-7/8" X -NIPPLE AT 11,332' MD. SET 4-1/2" X -LOCK -FLOW THROUGH SUB W/ BP TANDEM GAUGES AT 11,196' MD. RAN 4-1/2" CHECK SET TO 4-1/2" X -LOCK AT 11,196' MD (Tool indicates good set). 7/25/2019 *'*WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS**' TREE = WELLHEAD = FMC ACTUATOR= 16176 OKB_ ELEV = 6T REF ELEV = 60.35' BF._ELEV = 33.99' KOP = 3810' Max Angle = 96' 12521' DaWrn MD = Dah9n TVD = NA 8800' SS 91.5 #, H-40, D=19.124' 13-3/8' CSG, 68#, K-55 XO TO L-80 1338' CSG, 68#,L-80, ID =12.415" 19-58' CSG, 47#, L-80, D = 8.661' —3810' Minimum ID = 2.313" @ 11332' 2-7/8" X NIPPLE IN PTSA 4-12' TBG, 12.6#, 13CR-85 VAM TOP,11279' .0152 bpf, D = 3.958' 45KB BKR LTP w/ NS PTSA (0724119) 11322' TOP OF 3-12' X 2-78' X 2-38' LNR 11329' 2-78' X NIP, D = 2.313' H 11332' 15-27B 3-12' LNR, 9.3#,13CR-85 STL, .0087 bpf, D = 2.992' 14319' 412' BKR WHPSTOCK (05)23/19) 14403' 4-1/2' LNR, 12.6111, L-80 BT -M, -14403' .0152 bpf, D = 3.958' 2-78' LNR, 6.5#, 13CR-85 STL, .0058 bpf, D = 2.441' 15202- 9 374' X 3475" OH PACKFRS_ ID =1996^ TENDEKASWELLPKRNO DEPTH 6 16176 5 15931' 4 15756' 3 15559 2 15406 1 15344' INS 14JECTION VALVE - PBTD II 16458' 2-38- LNR, 4.7#, 13CR$5 HYD511, 16464' .0039 bpf, D =1.995' SAFL NOTES: WELL ANGLE > 70' @ 12145'. MAX DLS: 18' @D 15492'. "'4-1/2' CHROME TBG & LNR"" 3 3549 3548 1 MM 00ME RK is 0724/19 2 7778 6128 64 KBG2 SO BK 20 0724/19 1 11096 7902 34 KBG2 DMY BK 0 05/18/10 3658' 1-19-5/8" X 7' ITIEBACK SL6=V E, ID = 6.180' 3673' 9-518' X 7' BKR FLD(LOCK LNR HGP [)=6.180" MLLOUT WINDOW (15-27A) 3810'-3827- ( 4-12- HES X NIP. D = 3.813" 11166' 1-j7' X 4-1/2" HES TNT R(R. iD = 3.858' 11196' 4-1/Y HES X NP, D= 3.813' 11196' 412' XLOCK FLOWfHRU SUB w/DH GAUGES 11266- 4-12' HES XN NP MILLED TO 3.80' (520/19) 11271' 17' X 5' ZXPN HRD-E LTP w BKR FLIX-LOCK HGR & TIEBACK SLV, ID = 410' 11279' 4-1/2'WLEG, D=3.958' 1129T5'X4-1/2-XO,D=3.820' 15 113- 29- 310- DEPLOYSLV, D = 13-112'X 2-78' XO. D= 2.360' 1 MLLOUT WINDOW (15-276)14403' -14407' 15202' 2-7/8' X 2-3/8' XO, D =1.910' 2-1W AICfMRPV 3LIR JOINT_ ID =1.995' NO DEPTH NO. AICD 15 16933' 14 16392' 07/10/19 JMD DRLG HO CORRECTIONS 13 16320' 12 1624T 11 16134' 10 16061' 9 16019' 8 15890' 7 15848' 6 1580T 5 15705' 4 15663' 3 15622' 2 15499' 1 1595T DATE REV BY COMMENTS DATE REV BY COMMENTS 0211582 ORIGINAL COMPLETION 0881/19 JH/JMD FINAL ODE APPROVAL 05H9110 N7ES SIDETRACK (1S -27A 0624M9 N-CDR2 CTDST(15-27B) 07/10/19 JMD DRLG HO CORRECTIONS 0731/19 EPD/JMD GLV C/O (07124119) 0731119 EPD/JMD SET LTP w/PTSA & FLOTHRU SUB xdGAUAGES PRUDHOE BAYUNR WELL: 15-278 PERMR No: 219-045 API No: 50,029-22243-02 Winston, Hugh E (CED) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, August 1, 2019 10:46 AM To: AOGCC Reporting (CED sponsored) Subject: POP PBU 15-27B / PTD # 219-045 Hello, Please reference the following well: Well Name: PBU 15-27A Permit #: 219-045 API #: 50-029-22243-02-00 Date of Test: 7/29/19 Type of Test: IPT (Initial Production Test) Choke Size: 26 Choke Unit: Production Method: Flowing Duration (Hours Tested): 4 Top Reference (Top Perf MD): 15457' Bottom Reference (Bottom Perf MD): 16433' Tubing Flowing (Pressure): 207 Casing Pressure: 1202 Total Test Rate (O, G, W): 125 / 67 / 2 24 -Hour Rate (O, G, W): 751/400/10 Gravity (Oil, API): 32.2 GOR (Gas -Oil Ratio): 533 This well began Production on Method of Operations on this date: July 27, 2019 RgpMjko 0 12919 STATE OF ALASKA \L SKA OIL AND GAS CONSERVATION COMMIS' N WELL -IMPLETION OR RECOMPLETION REPO, AND LOG 11-4 X. %.P L.l V Is LA JUL 2 4 2019 la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ GINJ 13 WINJ ❑ 20MC 25 .105 20AAC 25.110 WAG ❑ WDSPL ❑ No. of Completions: One 11b. Well Cla y`�)fl� f'fl�Y. DavalOprrlefR $ ShAr❑ ¢' Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 6/24/2019 219-045 ' 3. Address: 7. Date Spudded: 15_ API Number: P.O. Box 196612 Anchorage, AK 99519-0612 6/16/2019 50-029-22243-02-00 4a. Location of Well (Governmental Section): 8, Date TO Reached: 16. Well Name and Number 6/20/2019 PBU 15-278 Surface: 324' FNL, 58' FWL, Sec. 22, T1 IN. R14E. UM r 9 Ref Elevations KB 60.35 - 17. Field/Pool(s): Top of Productive Interval: 478' FSL, 1203' FWL, Sec. 10, T1 IN. R14E, UM 31� GL 32.21 BF 33.99 PRUDHOE BAY. PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 392p' FSL, 292' FEL, Sec. 09, T1 IN, R14E, UM • 16458';8706' ADL 028306'& 028303 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11, Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 675968 y- 5961157 Zone - ASP 4 16512'18704' 78-084 TPI: x- 676957 y- 5987265 Zone - ASP 4 - 12. SSSV Depth (MDr VD): 20 Thickness of Permafrost MDRVD: Total Depth: x- 675375 y- 5970700 Zane - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21, Re-dnll/Lateral Top Window MD/ND: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 14403'/ 8717• 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, GR/CCL/RPM 23. CASING, LINER AND CEMENTING RECORD CASING Wf, PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H o 29' 109' 29' 109' 30" 232 cu It Coldest II 13-3/8" 68# K -55/L-90 29' 3486' 29' 3485' 16" 2584 ou ft Coldset III, 460 cu fl Class'G' 9-5/8" 47# L -ea 26' 3810' 26' 3809' 12-1/4" 2780 cu It Class'G' T. 26# L -e0 3658' 11446' 3657' 8191' 8-1/2" 221 ou it Class'G', 422 ou ft Class'G' 4-1/2" 12.6# L-90 11271' 14403' 8047' 8717' 6-1/8" 505 or It Class'G' 2-718".2-3/8-'1&5#141.7# tscres 1 11329' 16464' 8095' 8705' 4-1/4" Uncemented Liner w/ AICD B Swell Packers 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom, Perforation Size and Number; Date Perf l): GRADE DEPTHSET (MD) PACKER SET (MD/TV 4-1/2" 12.6# 13Cr85 11279' 11165'17960' 2-3/8" Liner w/AICD 6/23/2019 15457' 8726' 16247' 8711' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 15499' 8727' 16320' 8710' COMPLETION 15622' 8731' 16392' 8708' 15663' 8731' 16433' 8706' D TE Was hydraulicfracturing used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed 15705' 8729' Z zo(o information 15807' 8724' t DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 15848' 8723' V IFI D 15890' 8720' 16019' 8718' Freeze Protect w/ 245 Bible Diesel 16061' 8716' 16134' 8714' 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas lift, etc.): WA Dale of Test: Hours Tested: Produ dim for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Sire Gas -Oil Ratio: Test PeHod --► Flow Tubing Casino Press. Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API room: Press 24 Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only Af* M&Ii RBDMS-q�''JUL 2 5 2019 r7t-s V11(q G 28. CORE DATA Conventional Corals) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presenceof oil, gas orwater (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MO TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost- Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 12218' 8717• separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. TDF - Zone 1A 12218' 8717' Kicked off from Parent Well 14403' 8717' ' (15-27A) Formation at total depth: Zone 1A 12218' 8717' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name. Hartley, Josephine Authorized Title: ecialist Contact Email: Josephine.Hartley@bp.com Authorized Signature: Date:1/7.4I 1 Contact Phone: +1 9075644570 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a wail schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in Rem 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the coresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this formwell schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only WELLHEAD= FMC ACTUATOR= 16175' OKB. R = 6T REF ELEV = 60.35' BF. ELEV = 33.99' KOP= 3810' W16x Angle = 96'@ 12521' Daban WD= NA Dabs TVD= 8800SS U JMD DRQ' T 15-2T, 1 109' 9t5 #, H14 D =19.124' 3/8' CSG, 68#, K-55 XO TO L-80 113' 13-31W CSG, 6Bl{,L-80, D =12.415' —C Minimum ID = 3.725" @ 11266' 4-1/2" HES XN NIPPLE 9-5/8' WHPSTOCK (04/12/10) —F-3 4-1/2' TBG, 12.6#, 13CR-85 VAM TOP. 11279' .0152 bpf, ID = 3.958' 1 11329' 1 14403' 1.0152 bpf, D = 3.958• LNR 6.5#, 13CR-85 ST-, .0058 bpi, D = 2.441• 15202' 2374' X 3-475' OH PACKERS. I0=1.995" TENDEKA SWB-L PKR NO DEPTH 6 16175' 5 15931' 4 15755 3 15550 2 15406' 1 15344' NS� 13CR415 HYD511, .0039 L SAFE /OTES: WELL ANGLE> 70'@ 12145'. MAX ,: 18" @ 15492'. •'•4-12" CHROME TBG& LNR"' VLV LATCH 4-12' HES X NP, 1)= 3.813• 2234' 3 GAS LFT MANDRELS ST WD ND OEV TYPE VLV LATCH PORT DATE 3 3549 3548 1 Mr%' DOW RK 16 05/23/10 2 7778 6126 64 KBG2 SO BK 20 0523/10 1 11096 7902 34 KBG2 OMY BK 0 05/18110 TEBACKSLEEVF D=6.180' 3673' 9-58• X T BKR FLEK K LNR HGR D = 6.180' MLLOUTWINDOW(16-27A) 3810'-3827- 1113V 4-12-HESXNP,D=3.813' 11165* 17' X 4-1/2' HES TNT PKR D = 3.858' 11196' 11266' 4-12'HES X NP, D=3.813' 4-12' HES XN NP, D = 3.725° 11271' T X5'=HRDELTPw BKRFLEX-LOCK HGR 8, TEBACK SLV, D = 4 20' 14 11278' 4-12'YVLBG,D=3.958' 11� 5' X 4-12' XO. D = 3.920' 11329• 11370' DE3'LOY SI 11345' 3712' X P 1 1431W 1131/2' X 2-7/8' XO, D =2.360' MLLOUT WNDOW (15-27B) 14403'-14407' 5202 2-7/8' X 2-318' XO, D =1.910' 2-3/8" A1COMW SIIBJOINT- ID =1.985' NO DEPTH NO. ADD 15 1643T 14 16392' 07/10/19 AD OFa-G HO CORRSMIONS 13 16320' 12 16247' 11 16134' 10 16061' 9 18019' 8 15890' 7 15848' 6 15807' 5 15705' 4 15663' 3 15622' 2 15499' i 1 15457' TATE RP/ BY OOkTA3w5 DATE F?EV BY COWRUENTS 02/15182 ONQUAL COMPLETION 06719/10 MFS SIDETRACK(15-27A) 06721179 N-COR2 CTD ST (15278) 07/10/19 AD OFa-G HO CORRSMIONS PFUDHOE BAY LME WELL 15-278 FEFUT Nb: 219-045 AR Nb: 50-029-2224302 . T11 N. RUE. 324' ETL & 58TWt WL North America - ALASKA- BP Operation Summary Report Page 1 of 13 Common Well Name: 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date: 6/21/2019 X3-019FG-C: (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00 OOAM Rig Release: 5/2412019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 6/13/2019 06:30 - 07:00 0.50 MOB P PRE PREP TO MOVE OFF F -34C 07:00 - 09:00 2.00 MOB P PRE PRE JOB SAFETY MEETING WITH CREW AND 09:00 - 14'.00 5.00 MOB P 1400 - 1630 2.50 MOB P 1630 - 1830 2.00 MOB P 18:30 - 00:00 5.50 RIGU P I 6/1412019 00:00 - 03:30 3.50 RIGU P 03:30 - 04:00 0.50 RIGU P 04:00 - 0700 3.00 RIGU P TRUCK DRIVERS. i- EMPHASIS ON GOOD COMMUNICATION, VERIFY STOP COMMAND. '- STOP BLOCK IN PLACE TO PREVENT RIG FROM ROLLING BACKWARDS INTO WELL. - VALVES ON TREE SHUT IN AND ALL ANNULUS PRESSURES LESS THAN 50 PSI. - DRILL SITE OPERATOR NOTIFIED AND DECLINED WITNESSING RIG MOVE OVER WELL. -- ANYONE CAN STOP THE JOB AT ANYTIME BE WATCHFUL - MOVE MAIN AND PIT SUBS OFF WELL INSTALLJEEPS PRE MOVE TO DS 15 PRE RIG ON DS 15 -REMOVE JEEPS -_SPOT MAIN SUB THEN INSTALL_ CRAWLER PRE -SPOT RIG WITH CRAWLER . - PJSM TO REVIEW PROCEDURE AND ASSIGN SPOTTERS - MOVE RIG BACK, TEST E -STOP, E -STOP SHUT DOWN THE HYDRAULICS - SPOT RIG OVER WELL - RIG SPOTTED, HOLD AAR -RD CRAWLER - SPOT PITS "'RIG ACCEPTED AT 18:30"' PRE PJSM, - RIG UP CHECKLISTS - LTT BETWEEN SWAB AND MASTER TO 3500#. GOOD TEST - NIPPLE UP MPD LINE, NIPPLE DOWN TREE CAP. - EVACUATE FLUID DOWN TO SWAB VALVE. -INSTALL 7.06" TEST PLUG IN TEST SPOOL. (1-112" MT BOX) -NIPPLE UP BOPE PRE NIPPLING UP BOPE - PREPARE TEST JOINTAND TIWS -INSTALL INJECTOR, REPLACE PACK -OFFS. - VALVE CREW CHECK TORQUE ON TREE BOLTS PRE PRESPUD WITH WARDS (MICAH-S) CREW PRE FLUID PACK FOR BOPE TESTING -SHELL TEST BOPE Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths" Common Well Name: 15-27 Event Type: RE-ENTER- ONSHORE (RON) Protect: PBU North America - ALASKA - BP Operation Summary Report Start Date. 6/13/2019 End Date: 6/21/2019 Site: 15 Spud Date/Time'. 1/20/1992 12:OO:OOAM AFc No X3-019FG-C. (2,422,018 00 ) Rig Release: 6/24/2019 Page 2 of 13 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 07:00 - 21:00 14.00 BOPSUR P PRE PERFORM BI -ANNUAL BOPS TO 25015000 PSI AS PER BP AND AOGCC REGULATIONS. ALL RAMS TESTED ON RAM LOCKS TEST GAS ALARMS: PASS TEST WAIVED BY AOGCC REP LOU LAUBENSTEIN TEST 1: IRV, PACK -OFF, C9 BACKWARDS AND C10 BACKWARDS TO 3500 PSI - PASS TEST 2: BLINDS, B1, B4 (5000#) - BLINDS FAILED MOVE TO TEST #3 TEST 3: ANNULAR 2-3/8"(3500#) THROUGH TP3, TVI, TV2- PASS TEST4: UPPER 2-3/8"PIPE/SLIP, TIW#1, 818 B4 AND R1, BL1A (5000#) - PASS TEST 5: R2, C15, BL2, TIW#2 (5000#) - PASS TEST 6: C16, C11, BLI (5000#)- PASS TEST 7: C9, CIO, C7 (5000#) -PASS TEST 8: C5, C6, C8 (5000#) - PASS TEST 9: CHOKE A, CHOKE C - PASS TEST 10: CI, C4, VBR's, TV1 (5000#) - PASS 'TEST 11: C2, C3, TV2, LOWER 2-3/8" PIPE/SUP (5000#) PASS 'PERFORM DRAWDOWN TEST - PASS TEST 12: ANNULAR -3 -1/2"(3500#) -PASS TEST 13: VBRe— 3-1/2" (5000#) - PASS TEST 14: C28C3-PASS TEST 15: C9, C10 TO 4500 PSI PASS REPAIR BLIND SHEARS AND SIMOPS INSTALL BHI FLOATS AND TEST 7O 3500#. GOOD TEST TEST 16: RETEST BLIND SHEARS AND B3 (5000#) B3 INITIAL FAIL. CYCLE GREASE. PASS 21:00 - 23.30 2.50 BOPSUR P PRE - PULL TEST LUBRICATOR B ADAPTER FLANGE - PULLTEST PLUG (SEAL INTACT) - MU ADAPTER FLANGE AND DRILLING LUBRICATORS 2330 - 0000 0.50 BOPSUR P PRE PJSM, - PERFORM 250# 15000# TEST ON T1 PASS 6/15/2019 00:00 - 00:30 0.50 BOPSUR P PRE PERFORM TEST 250#/5000#ON T2. PASS. 00:30 - 03:00 2.50 RIGU P PRE RIG DOWN TEST EQUIPMENT. - REVIEW PROCEDURE FOR PULLTWC / BULLHEAD - STAB INJECTOR WITH NOZZLE. LOAD COIL WITH 8.6 PPG DRILLING MUD - EVACUATE FLUID TO MASTER VALVE. VALVE CREW TAKE MEASUREMENTS Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths" North America - ALASKA - Bia Operation Summary Report Page 3of13 Common Well Name: 15-27 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date'. 6/13/2019 End Date: 6/21/2019 X3-019FG-C: (2,422,018.00) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Datefrime: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr)_ Net) 0300 - 0800 5.00 RIG P PRE PJSM, -PU BPV LUBRICATOR. PERFORM METHANOL PURGE TO TIGER TANK IN PREPARATION FOR PRESSURE TEST. -PERFORM PRESSURE TEST 7O 3500# GOOD TEST. -ATTEMPT TO GRAB TWC. NOLUCK. -PERFORM LTT BETWEEN MASTER AND SWAB TO 3500#. - BLOW DOWN LUBRICATOR. - PU THE PULLING LUBRICATOR AND INSPECT THE TOOL. - FOUND A ROLLED SHOULDER THAT WOULDN'TALLOW THE TOOL TO FUNCTION PROPERLY. - MU TOOL STAB ON AND PT THE QTS. - GOOD PT, OPEN M & S VALVES AND PULL TWC. - TWC IS PULLED WITH 2500 PSI UNDER TWC. CLOSE M&S VALVE, LTT THEN PURGE THE - LUBRICATOR WITH 10 BBL OF METHANOL TO THE TT. RD VC LUBRICATOR. 08:00 - 12:30 4.50 KILLW P PRE 'PJSM, -INSTALL NIGHTCAP AND PT TO 3500# GOOD TEST. -PRESSURE UPTO2500PSI WITH METHANOL BETWEEN MASTER AND SWAB. - OPEN MASTER VALVE. - PUMP 10 BBLS 6.6PPG OF NEAT METHANOL AT IBPM WITH 257OPSI. - PUMP 290 BBLS OF 140° 8APPG 1% SLICK KCL AT 5BPM WITH 2550 ICP. -AFTER 130 BBLS AWAY PUMP PRESSURE AT 1000PSI. -AFTER 230 BBLS AWAY PUMP PRESSURE AT 1300PSI. -AFTER 270 BBLS AWAY PUMP PRESSURE AT 1800PSI. - SWAP OVER TO HIGH -VIS PILL AND PUMP 44 BBLS. WITH 1850PSI. - SWAP TO 8aPPG MUD AND PUMP 174 BBLS AT 5BPM WITH 1850PSI FINAL PRESSURE AT 1960PSI. - SHUT OFF PUMPSAND PRESSURE BLEEDS TO 200PSI IN 10 MINUTES. - PRESSURE DISIPATED TO 0 PSI - OPEN SWAB AND PURGE LUBRICATOR TO TIGER TANK WITH 10 BBLS OF MUD. - LINE UP TO FLOW ACROSS THE TOP TO ESTABLISH A LOSS RATE IF ANY - NO LOSSES, FLOW CHECK WELL - GOOD NO FLOW - REMOVE NIGHT CAP, MU QTS TO THE INJECTOR, STAB INJECTOR, CLOSE THE SWAB AND PT THE QTS - GOOD PT, OPEN SWAB AND FLOW CHECK RIG ON HIGH -LINE POWER AT 11:00 HOURS. Printed 7/8/2019 3:44:34PM "•All depths reported in Drillers Depths" North America - ALASKA - BP Page 4 of 13 Operation Summary Report Common Well Name. 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6 /1 312 0 1 9 End Date: 6/21/2019 X3-019FG-C: (2,422,018.00 ) Project PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ lust) 1230 - 1800 5.50 STWHIP P WEXIT MILL WINDOW OPS - PJSM TO MU THE MILLING BHA WHILE FLOW CHECKING WELL - GOOD NO FLOW, MU THE MILLING BHA ,- RIH WITH MILLING BHA, STOPAT 500' TO INSPECT PIPE, GOOD RIH - STOP AT 2500'& 7100' TO CHECK THE SADDLE CLAMPS - STOP AND PREP TO LOG TIE IN, OUT DENSITY STARTING TO DROP OFF, LINE UP TO TAKE RETURNS OUT TO THE TT - PURGE LUBRICATOR AS WELL - DENSITY AFTER LUBRICATOR PURGE STILL RUNNING 7.9 TO 8.2. - LOG TIE IN WITH -12' CORRECTION. TAG WHIPSTOCK 14402'DRY. 1800 - 1930 1.50 STWHIP P 14,402.00 WEXIT DISCUSS WITH WSUPT. -CONTINUE TO CIRCULATE BOTTOMS UP TO TIGER TANK - DENSITY SLOWLY INCREASING TO WHATS BEING PUMPED -BRING BACK INSIDE. FINGERPRINT _FLOWBACK. _ 19:30 - 00:00 4.50 STWHIP P 14,404.90 WEXIT MILL 3.80" WINDOW IN 4-1/2" LINER PER BAKER REP FROM 14400.4' MD TO 14404.90' MD - RATE: 2.81 BPM IN, 2.80 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.54 PPG OUT - DWOB: 0.9 — 3.8 KLBS -CIRC PRESSURE: 3478 PSI 6/16/2019 0000 - 01:30 1.50 STWHIP P 14,406.60 WEXIT MILL 3.80" WINDOW IN 4-1/2" LINER PER BAKER REP FROM 14404 90' MD TO 14406.f' - RATE: 2.81 BPM IN, 2.82 BPM OUT - MUD WEIGHT: 8.64 PPG IN, 8.50 PPG OUT - DWOB: 1.4 KLBS -CIRC PRESSURE: 3478 PSI 01:30 - 05:00 3.50 STWHIP P 14,422.00 WEXIT MILL 3.80" WINDOW IN 4-1/2° LINER PER BAKER REP FROM 14406.6' - RATE: 2.69 BPM IN, 2.71 BPM OUT - MUD WEIGHT: 8.64 PPG IN, 8.50 PPG OUT - DWOB: 1.4- KLBS -CIRC PRESSURE: 3034 PSI - DROP RATE 0.1 BPM TO CURB SOME OF THE VIBRATION - APPEARS WE ARE OFF AT 14407' FULL TRAY LENGTH WOULD OF BEEN 12.3' SAMPLE SHOWING 10% FORMATION. -TIME MILL TO 14409', WOB HAS FALLEN COMPLETELY OFF. MOTOR WORK HAS FALLEN OFF ALSO. - START WORKING ROP UP TO GET SOME WOB RESPONSE. - SAMPLE FROM 14409'[S 85% SAND Printed 7/8/2019 3.44:34PM **All depths reported in Drillers Depths" Common Well Name. 15-27 Event Type: RE-ENTER- ONSHORE(RON) PBU Active datum: RT @60.35usft (above Mean Sea L Date From - To Hm (hr) 0500 - 12:30 7.50 1230 - 19:30 7.00 North America - ALASKA - BP Operation Summary Report AFE No Start Date: 6/13/2019 End Date: 6/21/2019 X3-019FG-Cr(2,422,018.00) Site: 15 Spud Date/Time: 1/20/1992 12'.00:OOAM Rig Release: 6/24/2019 BPUOI: USA00000945 Task Code NPT Total Depth (usft) STWHIP P - _ 14,422.00 DRILL P 14,422.00 19.30 - 23:30 4.00 DRILL N 14,422.00 2330 - 0000 0.50 DRILL P 14,422.00 6/17/2019 00:00 - 00:30 0.50 DRILL P 14,422.00 0030 - 0200 1.50 DRILL N 14,422.00 02:00 - 10:00 8.00 DRILL P 14,508.00 Page 5 of 13 1 Phase Description of Operations WEXIT BEGIN REAMING WINDOWAT i FPM 14395- 14410' - SEEING A LITTLE MOTOR WORK AT THE TOP OF THE WINDOW - MAKE A COUPLE MORE PASSES OR UNTIL CLEAN - MADE 7 TOTAL PASSES 3 DOWN AND 4 UP AND WINDOW LOOKS CLEAN - DRY DRIFT IN BOTH CORRECTIONS CLEAN - DYNAMIC FLOW CHECK THEN POOH - STOPAT 13478' AND PAINTA FLAG (WHITE) - 3900' CHOKE IS PACKING OFF, LINE UP TO BLOW DOWN RETURN LINE MICRO -MOTION - 3700' PLUGGED OFF AGAIN, GOT BACK A LOT OF FLAT METALAND CHUNKS OF CMT FROM THE BLOW DOWN -POOH - FLOW CHECK WELL AND HOLD A PJSM TO LD AND PU THE BRA'S - LD THE BHAAND GAUGE MILLS - INJECTOR OFF AT 12:15 MILLSARE IN GAUGE WINDOW = 3.79 GO 3.78 NO GO, STRING = 3.80 GO 3.79 NO GO PRODI LATERAL DRILLING OPS -MU THE DRILLING BHAAND STAND BACK - CHANGE PACK -OFF AND TEST - DEPLOY THE BHA, PT THE OTS AND RIH - 4650' OUT MM PLUGGED OFF AGAIN, BLOW DOWN - RIH AT 4.0 BPM IN 14.4 BPM OUT. PUMPED 10 BBLS LOVIS , 20 BBLS HIVIS OUT AT 10540'. - CONTINUE IN THE HOLE -LOG TIE IN -27. RUN DOWN AND TAG BOTTOM. PUMP 10 BBLS LOVIS / 20 BBLS HIVIS. ONCE PILL IS OUT. START WIPER UP TO 11000' -SEEING MARKS ON PIPE. STOP PROD1 TROUBLESHOOT INJECTOR - MECHANICS / ELECTRICIANS ARRIVE. - CHAINS OUT OF SYNC. HAD TO REPLACE BOTH ENCODERS. _ PROD? LOG CCL FOR LINER TOP PROD[ FINISH LOGGING CCL PRODI DRESS PIPE PRODI DRILL 4-1/4' LATERAL FROM 14424' MD TO 14508' - FREE SPIN: 3350 PSI, 2.77 BPM - RATE: 2.77 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3350 - 3656 PSI - MUD WEIGHT: 8.64 PPG IN, 8.51 PPG OUT, ECD: 10.2 PPG AT WINDOW - ROP: 40- 60 FT/HR, WOB: 1.8 - 2.5 KLBS Printed 7/8/2019 3:44:34PM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 6 of 13 Common Well Name. 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date 6/13/2019 End Date: 6/21/2019 X3-019FG-C. (2,422,018 00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Daterrime: 1/20)1992 12:00:00AM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT ID60.35usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations 11-00- (hr) (usft) 1000 - 11:00 1.00 DRILL P 14,673.00 PROD1 DRILLER IS SEEING A 1.5 BBL INCREASE IN PIT VOLUME - PU OFF BOTTOM AND VERIFY NOTHING IS BEING ADDED TO THE PITS - DYNAMIC FLOW CHECK WELL, NOTIFY WSUPT - PREP TO SHUT DOWN AND FLOW CHECK WELL THEN WE STARTED LOSING FLUID - ZERO OUT MM AND MONITOR BOTTOMS UPS -- LOST 4.2 BBLS AND IN&OUTS ARE I:1 - NOW, THERE IS A FAULT MAPPED IN THIS AREAAND COULD BE THE FAULT - DRILLAHEAD 15' TO MAKE SURE WEARE THROUGH IT IF ITS A FAULT - NO CHANGE IN RATES, PU AND FINISH CIRCULATING BOTTOMS UP - BOTTOMS UP IS CLEAN, DISCUSS WITH WSUPT, PUMP 20 BBLS OVER IF NO CHANGE IN DENSITY OR RATE GO BACK TO DRILLING 11:00 - 18:00 7.00 DRILL P 14,673.00 PROD? 20 BBLS PAST BOTTOMS UP RATES AND DENSITIES ARE GOOD, GO BACK TO DRILLING - DRILL 4-1/4" LATERAL FROM 14673' MD TO 14875' - FREE SPIN: 3350 PSI, 2.77 BPM - RATE: 2.56 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 2970-3450 PSI - MUD WEIGHT: 8.69 PPG IN, 8.59 PPG OUT, ECD: 10.2 PPG AT WINDOW -ROP: 40-60 FT/HR, WOB: 1.4-3.1 KLBS - PU'S ARE GETTING STICKY, LSRV RUNNING -55k, BUMP UP TO -60K 18:00 - 20:30 2.50 DRILL P 1 14,875.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW 2030 - 2200 1.50 DRILL P 2200 0000 2.00 DRILL P FROM 14875' MD TO 13500' MD - RATE: 3.74 BPM IN, 3.82 BPM OUT. CIRC PRESSURE: 4050 PSI -LOG DOWN FOR TIE-IN FROM 14000' TO 14026.23' MD (FORMATION) WITH +7' CORRECTION -TRAP PRESSURE. CLOSE EDC. LOG ACROSS RA. _- RUN TO BOTTOM 14,950.00 PROD? DRILL 4-1/4" LATERAL FROM 14875'MD TO 14950' - FREE SPIN: 3460 PSI, 2.79 BPM - RATE: 2.79 BPM IN, 2.80 BPM OUT. CIRC PRESSURE: 3460-3712 PSI - MUD WEIGHT: 8.74 PPG IN, 8.59 PPG OUT, ECD: 10.32 PPG - ROP: 47 FT/HR, WOB: 2.8 KLBS 15,105.00 PROD? DRILL 4-1/4" LATERAL FROM 14950' 7015105' - FREE SPIN: 3500 PSI, 2.79 BPM - RATE: 2.79 BPM IN, 2.80 BPM OUT. CIRC PRESSURE: 3500- 3702 PSI - MUD WEIGHT: 8.74 PPG IN, 8.62 PPG OUT, ECD: 10.37 PPG - ROP: 150 FT/HR, V408: 1.6 KLBS - ROP RAPIDLY INCREASING. MAKING MORE FREQUENT PICKUPS DUE TO RAPID ROP. Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depi North America - ALASKA - BP Operation Summary Report Common Well Name: 15-27 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date. 6/21/7019 Page 7 of 13 AFE No X3-019FG-C: (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12.00 OOAM Rig Release: 6/24/2019 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase (hr) _ Waft) 6/18/2019 00:00 - 02:00 2.00 DRILL P 15,206.00 PROD1 0200 - 0600 4.00 DRILL N 15,206A0 PRODt 0800 - 1000 4.00 DRILL N 15,206.00 PROD1 Printed 7/82019 344.34PM **All depths reported in Drillers Depths" BPUOI'. USA00000945 Description of Operations DRILL 4-1/4" LATERAL FROM 15105' TO 15206' - FREE SPIN: 3500 PSI, 2.79 BPM - RATE: 2.77 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 3500— 3672 PSI - MUD WEIGHT: 8.76 PPG IN, 8.66 PPG OUT, ECD: 10.25 PPG - ROP: 90 FT/HR, WOB: 1.8 KLBS DIFFERENTIALLY STUCK - PULL TWICE ON PIPE TO 80K. VERIFY ABILITY TO ORIENT. -CONTINUE TO CIRCULATE WHILE GETTING KCL AND LVT READY - PUMP 10 BBLS KCL / 20 BBLS LVT 110 BELS KCL -SPOT 10 BBLS OF LVT OUT BIT. SHUT PUMP DOWN. SOAK FOR 10 MIN. - RIH AND PULLBACK INTO TENSION. PUMP 5 BBLS MORE OUT BIT SOAK FOR 20 MIN - WORK PIPE. NO LUCK. PUMP REMAINDER OF 20 BBLS OUT. LET SOAK. -ATTEMPT ONE MORE TIME. DISCUSSWITH ODE. -CIRCULATE LVTAND SPACERS OUT. - AGREE TO PUMP 40 BBLS OF LVT, WO OCN AND ROUND TRIP MT PUP FOR 20 MORE BBLS KCL 8 LVT PUMPED OUT, VERIFY ORIENTOR IS STILL FREE AND IT IS, SHUT DOWN PUMP HOLDING 10.1 ECD - SHUT DOWN PUMP AND ALLOW HOLE TO RELAX WHILE HOLDING 10.0 ECD - PU TO 86K AND HOLD, NO MOVEMENT - SLACK OFF AND PU AGAIN TO 86K AND HOLD, STILL NO MOVEMENT - SLACK OFF TO 5K UNDER NEUTRAL WF SO CREWS CAN WORK ON LINER WHILE WAITING FOR ADDITIONAL MINERAL OIL - 07:20 START PUMPING KCLAND 40 BBLS OF MINERAL OIL - PULL 75K BEFORE MINERAL OIL IS PUMPED OUT OF THE BIT - 08:20 10 BBLS OUT, SHUT DOWN PUMP MAINTAINING 10.1 ECD AND ROLL THE TOOLFACE - 08:40 PULL TO 87K (80% OF YIELD), 2 PULLS TO 86K WITH NO MOVEMENT - 08:45 PUMP 5 BBLS OUT AND SOAK 10 MIN THEN PULL 2X, REPEAT UNTIL FREE - 15 BBLS OUT ECD AT 10.22 PPG AND WHIR AT 474 PSI - PUMP 5 MORE BBLS OUT - WOB SUB IS NOW SHOWING -12K RIH AND PU TO 85K - SEEING GOOD WF TO THE WOB SUB PULLED 85K WITH NO MOVEMENT SO WE ARE STUCK BELOW THE WOB SUB - PUMP 5 MORE BBLS OUT -SLACK OFF AND PULLED 85K 2X - PUMP 5 MORE BBLS OUT North America - ALASKA - BP Operation Summary Report Page 8 of 13 Common Well Name: 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date. 6/21/2019 X3-019FG-C: (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00 00AM Rig Release: 6/24/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 18:00 8.00 DRILL P 15,206.00 PROD? PULLED FREE, CIRCULATE MINERAL OILS KCL OUT AND CHASE OOH -ONLINE WITH PUMP MAINTAINING 10.1-10.4 ECD - SLOWLY PULLED HEAVY UP TO 16K OVER AT 14670, RIH IS CLEAN, PU 100' DEEPER AND STILL SEEING THE SAME DRAG THROUGH THE BSAD THEN CLEANED UPAFTER CTC PULLED PAST THE MAPPED FAULT AT 14682', DISCUSSED WITH WSUPT & ODE - JOGGED AT THE WINDOW THEN PULLED THROUGH, OPEN EDC AND PUMP AT MAX RATE - WASH ACROSS WS TRAYAND PULL UP TO 10550 PUMPING PILLS FOR THE END OF THE TANGENT SECTION - PULLED TO 3600' AND PUMPED LOW & HI -VIS PILLS, BLEW DOWN THE OUT MM AND GOT SOME CHUNKS OF CMT AND A LITTLE METAL '- RIH AT 100 FPM TO INCREASE AVS AND PREP PITS TO SWAP MUD - LOG TIE IN WITH A -24.5' CORRECTION - RIH TO THE WINDOW AND CLOSE THE EDC - SAT DOWN AND POPPED BY 14661' 1800 - 1930 1.50 DRILL P 15,206.00 PROD1 DRILL 4-1/4" LATERAL FROM 15206' TO 15301' - FREE SPIN: 3500 PSI, 2.76 BPM - RATE: 2.76 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3500- 3672 PSI - MUD WEIGHT: 6.74 PPG IN, 8.60 PPG OUT, ECD: 10.36 PPG FOR 90 FT/HR, WOB: 1.8 KLBS 1930 - 2030 1.00 DRILL P 15,206.00 PROD1 PERFORM MUD SWAP. 2030 - 0000 3.50 DRILL P 15,450.00 PROD? DRILL 4-1/4"LATERAL FROM 15206'TO 15450' - FREE SPIN: 3213 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3213- 3488 PSI - MUD WEIGHT: 6.60 PPG IN, 8.52 PPG OUT, ECD: 10.3 PPG - ROP: 90- 100 FT/HR, WOB: 1.8- 2.2 KLBS 6/19/2019 0000 - 0300 3.00 DRILL P 15,503.00 PROD1 DRILL 4-1/4°LATERAL FROM 15450'-15503' - FREE SPIN: 3213 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3213 - 3488 PSI - MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT, ECD: 10.3 PPG - ROP: 20-40 FT/HR, WOB: 2.2 TO 2.8 KLBS HAVING HARD TIME STAYING ON BOTTOM. INCREASE LUBES TO 3% 500' WIPER TRIP 0300 - 0800 5.00 DRILL P 15,503.00 PROD? DRILL 4-1/4" LATERAL FROM 15503' - FREE SPIN: 3265 PSI, 2.73 BPM - RATE: 2.72 BPM IN, 2.72 BPM OUT. CIRC PRESSURE: 3213-3527 PSI - MUD WEIGHT: 8.63 PPG IN, 8.71 PPG OUT, ECD: 10.3 PPG - ROP: 2040 FT/HR, WOB: 2.2 TO 2.8 KLBS Printed 7/8/2019 3:44:34PM ""All depths reported in Drillers Depths" North America - ALASKA - BP Page 9 of 13 Operation Summary Report Common Well Name: 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Dale: 6/13/2019 End Date. 6/21/2019 X3-019FG-C'. (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Daterrime: 1/20/1992 12:00:00AM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 0800 - 10:30 2.50 DRILL P 15,660.00 PROD? WIPER TRIP 10:30 - 17:15 6.75 17:15 - 18:00 0.75 DRILL P DRILL P - DRILLED 450', WIPER TRIP TO WINDOW - DID NOT SEE THE DRAG WE SAW YESTERDAY THROUGH THE BSAD -JOG IN HOLE BELOW THE WINDOW - REDUCE RATE TO PULL THROUGH WINDOW - OPEN EDC AND PUMP AT MAX RATE UP TO 'TIE IN DEPTH - LOG TIE IN -+5' CORRECTION, RIH -CLOSE EDC AND RIH TO CONTINUE DRILLING 15,660.00 PROW DRILL 4-114" LATERAL - FREE SPIN: 3420 PSI, 2.80 BPM - RATE: 2.81 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 1734 — 3602 PSI - MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT, ECD: 10.3 PPG - ROP: 20-40 FT/HR, WOB: 1.4 TO 3.7 KLBS - DRILLING SHALE STARTED AT 15580' TO _ 15850'BACK IN A SAND 15,980.00 PROD1 DRILL 4-1/4" LATERAL - FREE SPIN: 3700 PSI, 2.88 BPM RATE: 2.68 BPM IN, 2.91 BPM OUT. CIRC PRESSURE: 3700-3906 PSI - MUD WEIGHT: 8.73 PPG IN, 8.65 PPG OUT, ECD: 10.5 PPG CHOKE 100% OPEN - ROP: 20-40 FT/HR, WOB: 2.2 TO 3.4 KLBS Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths" KWD DRILL WITH BEARD'S CREW, COMMENTS ON SAFETY TAB SIGNS OF PIPE LOCKING UP TRYING TO GET BACK TO BOTTOM. _ _ 18:00 - 00:00 6.00 DRILL P 15,980.00 PROD? WIPER TRIP TO WINDOW. - PULLED 15K OVER AT 14715', 14683', 14651' WOB AND SURFACE WEIGHT ERRATIC. -19:45 15539' STARTED PACKING OFF. ANNULAR PRESSURE SPIKING. DISCUSS ECD MAXIMUMS WITH ODE. - MANIPULATE PUMP RATE AND RUN BACK IN THE HOLE. STACKED WEIGHT AT 14626' -MANIPULATE PUMP RATE AND BHA POSITION TO KEEP EVERYTHING MOVING. - CONSISTENT ECD AND NO PUMP FLUCTUATION. PULL THROUGH WINDOW - TRAP 10.3 PPG AT WINDOW OPEN EDC, JET WHIPSTOCKAND CHASE OUT OF HOLE. 6/20/2019 00:00 - 01:00 1.00 DRILL P 15,980.00 PROD? CONTINUE WIPER -4000' PUMP 10 BBLS HIVIS SWEEP. -CHOKE PLUGGING WHEN HIT SURFACE. BYPASS CHOKE AND BLOW DOWN - CEMENT CHUNK, SHALE PIECES, WINDOW METAL. -TURNAROUND 01:00 - 0330 2.50 DRILL P 15,980.00 PROD1 RIH -3.77 BPM RATE IN / 4.18 BPM OUT RATE - 8.75 PPG IN / 8.58 PPG OUT. MINIMAL SOLIDS ON SHAKER. CONTINUE IN THE HOLE - PERFORMED KICK WHILE TRIPPING DRILL WITH BUSH CREW (SEE REMARKS) Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 10 of 13 Operation Summary Report Common Well Name: 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date'. 6/21/2019 X3-019FG-C: (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/time: 1/20/1992 12:00 OOAM Rig Release: 6/24/2019 Active datum: RT Q60.35usft (above Mean Sea Level) Date From - To Him Task (hr) 0330 - 0430 1.00 DRILL 0430 - 0630 2.00 DRILL 06:30 - 07:15 0.75 0715 - 1300 5.75 DRILL DRILL BPUOI: USA00000945 Code NPT Total Depth Phase Description of Operations _ (usft) _ P 15,980.00 PROD? - LOG DOWN FOR TIE-IN FROM 14000' TO 14028' MD (FORMATION) WITH *5' CORRECTION - TRAP 10.4 ECD. CLOSE EDC - RUN THROUGH WINDOW WITHOUT ISSUE. - 0.55 BPM IN RATE 10.69 BPM OUT RATE -8.67 PPG IN /8.59 PPG OUT ECD AT WINDOW 10.33 PPG -RUN THROUGH WINDOW. DRILLER NOTICED PACKOFF LEAKING. INCREASED PRESSURE. STILL LEAKING. P 15,980.00 PROD? PULLED THROUGH WINDOW. -NOTIFIED WSUPT/ODE - TRAP PRESSURE. CLOSE UPPER 2-3/8" PIPE / RAMS. CLOSE ANNULAR -OPEN EDC, BREAK CIRCULATION - DEVELOPED APPROVED LEVEL II OCN. -REPLACED PACKOFF ELEMENT/ EXTRUSION RINGS. ROLLING TEST TO 860 PSI. GOOD TEST. P 15,980.00 _- PROD? PACK OFF CHANGED AND TESTED -PUH TO VERIFY SLIP MARKS ON PIPE DID NOT CAUSE ANY DAMAGE '- PU 117' TO SLIP MARKS AND THEY ARE OK - CLOSE THE EDC AND RIH REDUCING PUMP PRESSURE THROUGH ALL SHALE INTERVALS - RIH CLEAN PAST FAULT AT 14682' P 15,980.00 PROD1 DRILL 4-1/4" LATERAL - FREE SPIN: 3700 PSI, 2.88 BPM - RATE: 2.88 BPM IN, 2.91 BPM OUT. CIRC PRESSURE: 3700-3906 PSI - MUD WEIGHT: 8.79 PPG IN, 8.66 PPG OUT, ECD: 10.75 PPG CHOKE 100% OPEN - ROP: 20-90 FT/HR, WOB: 2.2 TO 3.4 KLBS - ECD'S AT THE WINDOW ARE AT 10.76 AND IS OUT OF THE PARAMETERS IN THE WELL PLAN, CALL ODE AND DISCUSS -MAX ECD'S=WINDOW 11.0 EMW AND 11.5 EMWAT THE BHA - HAVE TO PU EVERY ONCE AND A WHILE AS Wt STACKS Printed 7/82019 3:44:34PM "All depths reported in Drillers Depths"' North America - ALASKA -BP Operation Summary Report Common Well Name: 15-27 Event Type: RE-ENTER- ONSHORE (RON) Start Date- 6/13/2019 End Date 6/21/2019 Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Daterrime: 1/20/1992 12:00:OOAM Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: RT @60.35usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase (hr) (usft) 13:00 - 18:00 5.00 DRILL P 16,350.00 PROD1 1800 - 1930 1.50 DRILL P 16,350.00 PROW 1930 - 2230 3.00 DRILL P ! 16,508.00 PROD1 22:30 - 00:00 1.50 DRILL P 16,508.00 PROD? 6/21/2019 00:00 - 01:30 1.50 DRILL P 16,508.00 PROD? Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths" Page 11 of 13 AFE No X3-019FG-C (2.422 018 00 ) BPUOI: USA00000945 Description of Operations WIPER TRIP DRILLED 350' - PREP PITS FOR MUD SWAP WHILE TRIPPING - PULLING HEAVY WITH THE BHAABOVE THE WINDOW THEN PULLED THROUGH - ONLINE AT 0.5 BPM JUST TO MOVE FLUID - PACKED OFF ON THE BHAABOVE THE WINDOW ECD WENT TO 11.8 PPG THEN DROPPED OFF - OPEN THE EDC AND PUMP AT 1.0 BPM, ESTABLISH RETURNS THEN INCREASE RATE AND WORK EDC DOWN TO JET OUT TO THE WINDOW PUMPING A 10 X 10 LHVP'S - HAD A COUPLE LIGHT SET DOWNS BELOW THE WINDOW THE LIGHT OVER PULLSAT THE BIT - CALL WSUPT NEWLON AND ODE TO DISCUSS PULLING UP TO THE BOTTOM OF THE LONG TANGENT SECTION TO MAKE SURE THE WELL IS CLEAN UP TO THAT POINT - GETTING CONSISTANT CUTTINGS ACROSS THE SHAKER, GRABA SAMPLE TO HAVE GEO CHECK TO SEE IF IT'S SHALE '- SAMPLE IS SAND BUT IT'S COATED WITH SOMETHING THAT HE IS NOT SURE OF - LOG DOWN FOR TIE-IN FROM 14000' TO 14027' MD (FORMATION) WITH +7' CORRECTION RIH - 0.47 BPM IN RATE / 0.65 BPM OUT RATE - 8.53 PPG IN / 8.67 PPG OUT RATE. - 14,619', 15,670, 15732 SWAP MUD DRILL 4-1/4" LATERAL - FREE SPIN: 3130 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.80 BPM OUT. CIRC PRESSURE: 3130 — 3350 PSI - MUD WEIGHT: 8.59 PPG IN, 8.47 PPG OUT, ECD: 10.02 PPG CHOKE 100% OPEN - ROP: 20-90 FT/HR, WOB: 2,2 TO 2.5 KLBS - DRILLED WELL TO A 16508' UNCORRECTED DEPTH CONDITION WELLBORE FOR LINER - 3.1 BPM IN RATE / 2.99 BPM OUT RATE -8.60 PPG IN /8.51 PPG OUT MAINTAINING 10.13 PPG AT WINDOW - SLIGHT OVERPULL AT 14618- 14611 - PERFORM 100' JOG 14450- 14550' PRIOR TO PULLING THROUGH WINDOW - PULLED THROUGH WINDOW WITHOUT ISSUE. TRAPPED PRESSURE CONDITION WELLBORE -OPEN EDC - 3.94 BPM IN RATE / 4.01 BPM OUT RATE - 8.65 PPG IN 18.50 PPG OUT -JET WHIPSTOCK. CHASE UPHOLE TO 1312 WHILE PUMPING A BOTTOMS UP. - LOG DOWN FOR TIE-IN FROM 14000' TO 14031.89' MD (FORMATION) WITH +2' CORRECTION -RIH TO WINDOW. CLOSE EDC. North America - ALASKA - BP Operation Summary Report Common Well Name'. 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6113/2019 End Date: 6/21/2019 X3-019FG-C: (2.422.01800) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 120/1992 12:00 OOAM Rig Release: 6/24/2019 Page 12 of 13 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _(hr) (usft) 01:30 - 02:30 1.00 DRILL P 16,512.00 PROD? RUN TO BOTTOM TO CORRECT TO - 0.56 BPM IN RATE / 0.67 BPM OUT RATE - 8.59 PPG IN /8.50 PPG OUT MAINTAINING 10.3 PPG ECDAT WINDOW - SAT DOWN 4K AND POPPED BY 15508' - CORRECTED TD 16512' 0230 - 09.30 7.00 DRILL P 16,512.00 PROD1 PERFORM LONG WIPER TRIP TO SWAB FROM 16512' MD TO O' MD - RATE: 3.12 BPM IN, 2.95 BPM OUT. CIRC PRESSURE: 3491 PSI -8.64 PPG IN/8.51 PPG OUT -JOGATWINDOW. PULLTHROUGH . WITHOUT ISSUE. - OPEN EDC, JET TRAY WITH 15 BBLS HIVIS SWEEP. - TRIP TO THE SWAB CHASING 180K LSRV PILL - PUMPANOTHER 180K LSRV PILL FOR 4000' - PILLAT SURFACE WITH NO INCREASE IN CUTTINGS OR CHOKE PLUGGING ISSUES - 150' FROM SURFACE JOG IN HOLE - TAG UP 09:30 - 12:10 2.67 DRILL P 16,512.00 PROD? . CONTINUE LONG WIPER '-TAGGED UP, NO PACKING OFF ISSUES. -ZERO DEPTHS AND RIH - PU WT AT 9200'- 37K - PU Wr AT 111 00' = 52KAT MIN RATE 12:10 - 12:45 0.58 DRILL P 16,512.00 PROD1 LOST POWER TO THE MAIN SUB, WELL IS SECURED WITH THE DRILLING CHOKE HOLDING 448 PSI FOR MANAGED PRESSURE DRILLING AND INCREASED RACKOFF PRESSURE, ALL HANDS HAVE REPORTED TO THEIR STATIONS AND ARE STANDING BY MONITORING - BUMP WHP UP TO MAINTAIN BETWEEN 10.1 AND 10.4 EMW AT THE WINDOW -STILL HAVE HIGH LINE POWER, LOST POWER TO THE MAIN SUB, SOMETHING INTERNAL TRIPPED AND KICKED US OFFLINE _ 12:45 - 14:45 2.00 DRILL P 16,512.00 PROD1 POWER IS RESTORED, TIE IN BREAKER ON THE PIT SIDE TRIPPED DUE TO OVER HEATING. - NOTIFY ON CALL WSUPT NEWLON AND DISCUSS PLAN FORWARD - OK TO GO BACK TO WORK -ONLINE WITH PUMP HOLDING 10.1 EMW AT THE WINDOW, POOH & RIH TO CHECK THE INJECTOR FUNCTIONS - ALL IS GOOD, RIH LOG TIE IN - CLOSE EDC AND DRIFT TO TD AT MIN RATE - CORRECT DEPTH -30' AND RIH TO WINDOW - 14627 1.79k, 14655 1.2k Printed 7/8/2019 3:44:34PM "All depths reported in Drillers Depths'" North America - ALASKA -BP Operation Summary Report Page 13 of 13 Common Well Name: 15-27 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date: 6/21/2019 X3-019FG-C: (2,422,018.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00:o0AM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hm Task Code NET Total Depth Phase Description of Operations (hr) (usft)_ - CLEAN TRIP OOH, PULL THROUGH THE 14:45 - 20:30 5.75 DRILL P 16.51Z00 PRODt TAG TD ON DEPTH Printed 7/62019 3:44:34PM **All depths reported in Drillers Depths" - SWAP TO LINER PILLAND DYNAMIC FLOW CHECK WELL -GOOD DYNAMIC FLOW CHECK �- POOH LAYING IN LINER PILL WITHOUT BEADS TO THE WINDOW - CLEAN TRIP OOH, PULL THROUGH THE WINDOWAND OPEN THE EDC -ONLINE WITH THE EP MUD LUBE PILL, PUMP DOWN TO THE EDC THEN REDUCE 'RATE TO 2.5 BPM - 75 BBLS UP THE BACKSIDE START THE 9.8 PPG KWF DOWN THE COIL AND PUH TO 12350' - LET FEW BBLS OF 9.8 OUT THEN POOH LAYING IN - PAINT WHITE FLAG AT 11129.79' BIT DEPTH (11050' EDP) - PAINT YELLOW FLAG AT 9017.77' BIT DEPTH ( 8937.98' EOP) -PULL OUT HOLE 20:30 - 22:00 1.50 DRILL P l 16,512.00 PROD1 MONITOR WELL FOR 10 MINUTES STATIC - PJSM FOR LAYING DOWN BHA LAYING DOWN BHA. 22:00 - 22:30 0.50 BOPSUR P 16,512.00 PROD1 WEEKLY BOPE FUNCTION TEST 22:30 - 0000 1.50 RIGU P 16,512.00 PROD1 BREAK DOWN UOC PJSM, BOOT E -LINE. PREP TO PUMP SLACK OUT BEGIN PUMPING SLACK OUT SWAPPED OVER TO CON Printed 7/62019 3:44:34PM **All depths reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Common Well Name. 15-27 Event Type: COM- ONSHORE (CON) Start Date. 6/22/2019 End Date: 6/24/2019 AFE No (1,337,575.00 ) Page 1 of 3 Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/time: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 6/22/2019 00:00 - 05:30 5.50 RIGU P 16,512.00 RUNPRD PUMP 314' OF POSSIBLE 209' FROM FACTORY 05:30 - 17:00 11.50 RUNCOM P 1700 - 20.00 3.00 RUNCOM P 2000 - 2200'. 2.00 RUNCOM P 22:00 - 00:00 2.00 RUNCOM P Printed 7/8/2019 3'.47:47PM "All depths reported in Drillers Depths" OUT. SURGE MULTIPLE TIMES CUT 20' COIL DUE FLAT SPOT IN COIL. -MAKE UP CTC. PULL TESTED TO 50K. PRESSURE TEST COIL CONNECTOR TO 4500# -REPLACE PACKOFF, TEST TO 250 LOW/ 3500 PSI HIGH - MAKE UP NOZZLE. LOAD / LAUNCH 7/8" STEEL BALL. RECOVERED 718" -STEEL BALL 16,512.00 RUNPRD PREP FLOOR TO RUN COMPLETION '- PJSM TO MU COMPLETION - WALK THROUGH COMPLETION WITH DRILLER, NS FIELD SPECIAISTAND TENDEKA REP - MU COMPLETION AS PER APPROVED SUMMARY - AICD'S & SWELL PACKERS RAN, MU LINER - HOLD KWT DRILL, SAFETY JOINT PU AND WELL SECURED ON 53 SECONDS, ALL HANDS CALLED IN FROM STATIONS STANDING BY - HOLD AAR THEN REMOVE ALL EXCESS 2-3/8 LINER FROM PIPE SHED, COUNT VERIFIED AND SWAP OVER TO 2-7/8" HANDLING EQUIPMENT _ - ALL 2-7/8" RAN, SWAP TO 3-1/2" 16,512.00 RUNPRD COMPLETION RAN - CLEAN RIG FLOOR -PREP TO RUN UPPER BHA, CHANGE ELEVATORS TO 2-3/8 FOR PH6 - RUN PH6 AND HANG OFF IN UPPER 2-3/8" COMBI'S - RUN DEPLOYMENT SLEEVE AND PH6. WEIGHTS 40K -STRIP DOWN OVER BHAAND MU TO LUBRICATOR - TAG UP LENGTH = 1,91- 16,512,00 RUNPRD RIH - 0.17 BPM IN RATE / 0.59 BPM OUT - 8.71 PPG IN / 9.78 PPG OUT - RIH WEIGHTAT 7500'17K. - PU WEIGHT AT 10,300 48K UP 16K RIH - PU WEIGHT AT 13,600 68K UP 16,512.00 RUNPRD BREAK CIRCULATION - ATTEMPT TO GET 2 BPM. START LOSING 0.6 BPM. BACK RATE DOWN. GRADUALLY WORK RATE UP TO MAINTAIN 1-1 CIRCULATED 9.8 PPG FLUID OUT OF WELL. STOP AT YELLOW FLAG 14291.69 -14254.89 = -36.8' PU WEIGHT 65K RIH WEIGHT 20K AT WINDOW Printed 7/8/2019 3'.47:47PM "All depths reported in Drillers Depths" Common Well Name: 15-27 Event Type: COM- ONSHORE (CON) PBU Rig North America - ALASKA- BP Page 2 of 3 Operation Summary Report AFE No Start Date6/22/2019 Eno Date. 6/24/2019 X3-019FG-C: (1,337,575.00 ) Site: 15 Active datum: RT @60.35usft (above Mean Sea Level) Date From - To Hire Task (hr) 6/23/2019 00:00 - 0300 3.00 RUNCOM BPUOI: USA00000945 Code NPT Total Depth Phase Description of Operations (usft) P 16,512.00 RUNPRD RUN LINER INTO OPEN HOLE 03:00 - 07:00 4.00 RUNCOM P 07:00 - 11:30 4.50 RUNCOM P - SET DOWN 15696',15776'. - HAD TO WORK ITAT 15952' COUPLE TIMES. KEEP COMING UNLATCHED FROM LINER. �- FRICTION IN LINER IS ENOUGH TO PUMP G SPEAR OFF - CONTINUALLY HAVING TO WORK LINER. WITHOUT PUMPS IS WORKING THE BEST. - WORKING LINER BY PUMPING FOR SHORT PERIODS AND RUNNING IN HOLE WITH PUMP OFF TD FLAG ON DEPTH AS WE WENT BY. - WORKED DOWN TO 16464'. BREAK CIRCULATION. PU WEIGHTS 9ETWEEN75- 85K WITHOUT PUMPS - DISCUSSED WITH ODE. PUMP MINERAL OIL 16,512.00 RUNPRD PUMP 10 BBLS KCL 120 BBLS LVT / 10 KCL 'PUMP LVT OUT. ATTEMPT TWICE TO PULL OFF BOTTOM. 87K PULL. ATTEMPT BRINGING WELLHEAD PRESSURE UP TO 500 PSI. NO LUCK. - CIRC OUT LVT AND WAIT FOR RES DEV TO REVIEW LINER SUMMARY BASED ON THIS DEPTH. GOTAPPROVAL TO LEAVE LINER WHERE IT IS IF WE CAN'T GET ITANY DEEPER ONCE THE LVT IS OUT - LVT OUT, TRY WORKING DOWN ONLY, IF NOTABLE TO GETANY MOVEMENT DOWN WE ARE DONE 16,512.00 RUNPRD POOH - CORRECT DEPTH TO GS -POOH FOLLOWING PRESSURE SCHEDULE - PUMP 55 BBLS OF FRESHWATER INTO REEL FOR SLACK MANAGEMENT - BLEED OFF PRESSURE AND FLOW CHECK WELL Printed 7/8/2019 3:47:47PM **All depths reported in Drillers Depths— Common Well Name. 15-27 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Page 3 of 3 Operation Summary Report Start Date: 6/22/2019 End Date'. 6124/2019 AFE No K3-019FG-C: (1,337,575.00 ) Project: PBU Site: 15 Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019 Active datum: RT @60.35usft (above Mean Sea I Date From - To Him (hr) 11:30 - 1930 8.00 1930 - 00:00 4.50 Task Code NPT RUNCOM P RUNCOM P 6/24/2019 00:00 - 01:30 1.50 RUNCOM P 01:30 - 0830 7.00 RIGD P Total Depth Phase Description of Operations (usft) 16,512.00 RUNPRD LD BHAAND PERFORM SLACK MANAGEMENT - GOOD NO FLOW, PU INJECTOR AND LD THE LINER RUNNING TOOLS - STAB INJECTOR, CLOSE MASTER VALVE - FLUSH MPD LINE WITH FRESH WATER - PUMP SLACK BACK, CLOSE SWAB & LTT M&S VALVES - REMOVE INJECTOR, INSTALL NIGHT CAP AND TEST -OPEN SWAB AND BLOW DOWN MPD LINE - CLOSE TANGO VALVES -OPEN MASTER VALVE AND FLOW CHECK WELL - GOOD NO FLOW, REMOVE INJECTOR AND RU PIPE CUTTER - CUT 340' OF COIL FOR 2% SLACK, RD CUTTER - MU CTC, PULL TEST TO 50KAND PT TO 4K - MU STINGER AND NOZZLE, CLOSE MASTER AND PUMP SLACK FORWARD - PT LUBRICATOR CONNECTION - HEAD UP BHI LOC. TEST UQC. GOOD TEST '- MAKE UP BHA DOWN TO DBPV, TEST TO 3500#. GOOD TEST - MAKE UP SEAL STINGER. - TEST QTS TO 3500#. 16,512.00 RUNPRD RIH WITH SEAL STINGER ASSEMBLY BHA #4 - RATE: 0.57 BPM IN, 1.05 BPM OUT. CIRC PRESSURE' 1088 PSI - MUD WEIGHT: 8.67 PPG IN, 8.62 PPG OUT - RIH WEIGHT 21 K / PU WEIGHT 50K AT 11240' -TAG AND SEE PRESSURE INCREASE AT 11365'. PRESSURE UP TO 2600#. BALL SEAT SHEARED. -BREAK CIRCULATION. 2.02 BPM IN /1.97 BPM. - ONLINE WITH DIESEL. 1.98 BPM 12,01 BPM -PUMP DIESEL AROUND LINER, POOH LAYING IN DIESEL. HOLDING 450 PSI ON WELLHEAD 16,512.00 RUNPRD POOH - 1.70 BPM IN RATE / 1.20 BPM OUT RATE -6.8 PPG IN /8.6 PPG -TAG UP AND TRAP 450# ON WELLBORE. -VALVE CREW GREASED AND CLOSED BOTH SWAB AND MASTER VALVE -PERFORM LTT BETWEEN MASTER AND SWAB 7O 3500#. GOOD TEST - OPEN CHOKE TO TIGER TANK. CIRCULATE REMAINING DIESEL OUT OF REEL -JET STACK WITH FRESHWATER. BLOW DOWN STACK 16,512.00 POST RIG DOWN AND MOVE OFF - REMOVING FLUID FROM PITS - TRUCKS ON LOCATION TO MOVE OFF WELL -BOP'S ND, NU TREE CAPAND TEST "'RIG RELEASED AT 08:30"' Printed 7/8/2019 3.47.47PM **All depths reported in Drillers Depths" Daily Report of Well Operations 15-27B ACTIVITYDATF SUMMARY T/1/0=500/0/0 POST CDR2. Evacuated fluid down to taret 90. RID test spool #2 & installed tree cap. Torqued treecap to 886 ft lbs. R/U CIW lubricator #839 with H plug & tool. PT'd lubricator low 300psi, High 3500psi. Set 4" H TWC #440 @ 110". Performed LTT on TWC. RID CIW lubricator. Evacuated fluid down to MV gate. RID CDR2 Target 90 #3. RID CDR2 tree #6. Installed production tree. Torqued MVx THA to 553 ft lbs. Torqued MV x SSV to 886 ft lbs. Installed Tapped blind on WV & torqued to 886 ft lbs. Modify & install Scaffold 6/24/2019 kit. *** Job in Progress*** Continued on day shift. T/I/O = TWC/0/0. (Test and Pull). PT'd against TWC 350/5000 PSI (Pass) Charted and Retained. Pulled 4" TWC #440 @130" w/ Lubricator 839. RDMO. ***Job Complete***. 6/25/2019 FWPs = 420/0/0. CTU #8 1.5" 0.109 WT. Objective: Drift/RPM MIRU. Load well with 208 bbis 1% slick KCL w/ safelube. MU & RIH w/ 1.80" DJN drift. 7/20/2019 ***Job Continued on 7/21/19 WSR*** CTU #8 1.5" 0.109 WT. Objective: Drift/RPM Continue RIH w/ 1.80" DJN drift. Tag TD at 16455' CTM. Lay in 1% slick KCL w/ safelube in linerwhile POOH. RIH w/ Baker Atlas RPM. Log from bottom at 16,449' (CTM) to 11,150'. Log repeat pass from 12,350'- 12,050'. POOH. Pump 38 bbl 50/50 freeze protect. 7/21/2019 ***Job Continued on 7/22/19 WSR*** CTU #8 1.5" 0.109 WT. Objective: Drift/RPM Finish POOH. RDMO. 7/22/2019 ***Job Complete*** by North America - ALASKA - BP PBU 15 15-27 15-27B 500292224302 Design: 15-27B Final Survey Report 21 June, 2019 Company: North America - ALASKA - BP Project: PBU Site: 15 Well: 15-27 Wellbore: 15-278 Design: 15-278 BP Final Survey Report Local Coordinate Reference: Well 15-27 TVD Reference: RT @ 60.35usft (15-27A) MD Reference: RT @ 60.35usft (15-27A) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27. OGP-Use AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site 15, TR -11-14 Declination Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well 15-27,15-27 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 15-27B 5,958,837.360 usft 676,296.980 usft 0.000 in 5,961,157.180 usft 675,967.790 usft 33.99 usft Magnetics Model Name Sample Date Declination Dip Angle BGGM2018 7/1/2019 16.82 80.93 Design 15-27B Audit Notes: Version: 1 0 Phase: ACTUAL Tie On Depth: Vertical Section: Depth From (TVD) +N/S +El -W (usft) (usft) (usft) 26.36 0.00 0.00 Latitude: 70° 17'35.236 N Longitude: 148° 34'21,213 W Grid Convergence: 1.34 ° Field Strength (nT) 57,419 14,371.90 Direction (°) 340.00 Latitude: 70" 17' 58.123 N Longitude: 148° 34'29Z22 W Ground Level: 32.21 usft 62112019 11:23:20AM Page 2 COMPASS 5000.1 Build 81D M* BP Final Survey Report Company: North America - ALASKA - BP Inc Local Coordinate Reference: Well 15-27 Project: PBU WS WIN TVD Reference: RT @ 60.35usft (15-27A) Site: 15 (usft) (°) MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 (usft) (usft) North Reference: True Wellbore: 15-27B 26.36 0.00 Survey Calculation Method: Minimum Curvature Design: 15-27B 0.00 0.00 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 6/21/2019 0.90 186.30 431.33 From To -0.35 5,961,154.011 675,967.515 (usft) (usft) Survey (Wellbore) Tool Name Description 930.29 431.35 3,440.3515-27 Srvy1 MWD (15-27) MWD MWD -Standard 675,969.675 3,705.00 4,213.00 15.27APB1 Srvy 1 GVD GC SS (15-27AP GVD-GC-SS Gyrodata gyro single shots 1,430.24 4,307.01 11,405.1715-27APB1 Srvy 2 MWD+IFR+MS(15-27A MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal 675,975.947 11,445.70 11,898.41 15-27APB1 Sivy 3 MWD+IFR+MS(15-27A MWD+IFR+MS-WOCA MWD + FIR +Multi Station W/O Crustal 1,939.12 11,926.82 14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 675,985.664 14,403.00 16,512.00 Survey#1(15-27B) MWD MWD -Standard 2,433.99 Survey MD Inc An TVD TVDSS WS WIN Northing Eluding DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) 26.36 0.00 0.00 26.36 -33.99 0.00 0.00 5,961,157.180 675,967.790 0.00 431.35 0.90 186.30 431.33 370.98 -3.16 -0.35 5,961,154.011 675,967.515 0.22 930.35 0.80 135.50 930.29 869.94 -9.54 1.66 5,961,147.681 675,969.675 0.15 1,430.35 0.87 84.33 1,430.24 1,369.89 -11.66 7.89 5,961,145.712 675,975.947 0.14 1,939.35 1.58 58.30 1,939.12 1,878.77 -7.59 17.70 5,961,150.010 675,985.664 0.17 2,434.35 1.28 112.80 2,433.99 2,373.64 -6.14 28.61 5,961,151.709 675,996.530 0.27 2,942.35 1.10 119.00 2,941.88 2,881.53 -10.71 38.10 5,961,147.370 676,006.129 0.04 3,440.35 0.85 180.50 3,439.82 3,379.47 -16.72 42.25 5,961,141.457 676,010.417 0.20 3,705.00 0.81 145.57 3,704.44 3,644.09 -20.22 43.29 5,961,137.977 676,011.539 0.19 3,800.00 0.78 156.02 3,799.43 3,739.08 -21.37 43.93 5,961,136.848 676,012.208 0.16 3,810.00 1.67 175.52 3,809.43 3,749.08 -21.58 43.97 5,961,136.641 676,012.252 9.70 3,827.00 1.81 184.77 3,826.42 3,766.07 -22.09 43.97 5,961,136.127 676,012.261 1.84 3,631.00 2.14 187.03 3,830.42 3,770.07 -22.23 43.95 5,961,135.990 676,012.250 8.48 3,894.00 0.27 48.65 3,893.41 3,833.06 -23.30 43.92 5,961,134.920 676,012.243 3.73 3,925.00 0.88 214.81 3,924.41 3,864.06 -23.44 43.84 5,961,134.770 676,012.166 3.69 3,958.00 1.66 210.54 3,957.40 3,897.05 -24.06 43.45 5,961,134.141 676,011.794 2.38 3,988.00 243 170.60 3,987.38 3,927.03 -25.07 43.34 5,961,133.137 676,011.698 5.22 4,019.00 2.37 112.44 4,018.36 3,958.01 -25.96 44.03 5,961,132.260 676,012.416 7.55 V. Sec (usft) 0.00 -2.85 -9.53 -13.65 -13.18 -15.56 -23.09 - -30.16 -33.81 -35.11 -35.31 -35.80 -35.92 -36.91 -37.03 -37.48 -38.38 -39.45 6212019 11:23:20AM Page 3 COMPASS 5000.1 Build 81D 502 BP Final Survey Report Company. North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-278 Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS HIS E/W Northing Easting DLeg V. Sec (usft) (') (') (usft) (usft) (usft) (usft) (usft) (usft) (°I100u8ft) (usft) 4,052.00 1.50 74.39 4,051.34 3,990.99 -26.10 45.08 5,961,132.140 676,013.466 4.56 -39.95 4,082.00 2.26 5.57 4,081.33 4,020.96 -25.41 45.52 5,961,132.844 676,013.885 7.38 -3944 4,120.00 5.11 355.03 4,119.25 4,058.90 -22.98 45.44 5,961,135.274 676,013.754 7.68 -37.13 4,213.00 8.69 25.39 4,211.58 4,151.23 -12.50 48.10 5,961,145.812 676,016.163 5.37 -28.19 4,307.01 14.04 21.27 4,303.72 4,243.37 4.56 55.28 5,961,163.030 676,022.949 5.75 -14.63 4,332.13 15.71 16.14 4,328.00 4,267.65 10.66 57.34 5,961,169.183 676,024.856 8.46 -9.59 4,425.63 23.88 11.71 4,415.90 4,355.55 41.41 64.71 5,961,200.090 676,031.507 8.88 16.78 4,518.94 28.92 9.22 4,499.46 4,439.11 82.20 72.16 5,961,241.043 676,038.002 5.53 52.56 4,611.72 33.63 5.71 4,578.74 4,518.39 129.94 78.32 5,961,288.910 676,043.037 5.44 95.32 4,706.48 35.63 9.84 4,656.72 4,596.37 183.26 85.65 5,961,342.382 676,049.115 3.25 142.91 4,801.20 38.20 8.85 4,732.44 4,672.09 239.39 94.87 5,961,398.711 676,057.020 2.78 192.51 4,895.19 40.41 8.93 4,805.17 4,744.82 298.21 104.07 5,961457.725 676,064.841 2.35 244.63 4,989.47 45.44 6.66 4,874.19 4,813.64 361.60 112.71 5,961,521.501 676,071.994 5.56 301.43 5,083.77 49.03 6.98 4,938.20 4,877.85 430.53 120.94 5,961,590.398 676,078.607 3.82 363.20 5,177.72 53.97 6.64 4,996.67 4,936.32 503.52 129.65 5,961,663.562 676,085.604 5.27 428.81 5,272.11 58.18 7.17 5,049.34 4,988.99 581.25 139.07 5,961,741.491 676,093.203 4.48 498.63 5,366.05 62.61 5.32 5,095.74 5,035.39 662.42 147.92 5,961,822.841 676,100.153 5.02 571.88 5,459.43 65.64 4.13 5,136.49 5,076.14 746.14 154.83 5,961,906.695 676,105.099 3.44 648.19 5,553.83 68.50 2.88 5,173.26 5,112.91 832.91 160.14 5,961,993.558 676,108.369 3.27 727.91 5,647.48 67.26 1.70 5,208.53 5,148.18 919.59 163.61 5,962,080.294 676,109.809 1.77 808.18 5,741.62 66.52 1.52 5,245.48 5,185.13 1,006.15 166.04 5,962,166.872 676,110.214 0.81 888.68 5,836.48 65.88 1.03 5,283.76 5,223.41 1,092.92 167.97 5,962,253.659 676,110.114 0.82 969.56 5,928.88 65.28 358.54 5,321.96 5,261.61 1,177.04 167.66 5,962,337.747 676,107.833 2.54 1,048.71 6,023.05 66.01 357.44 5,360.80 5,300.45 1,262.77 164.65 5,962,423.382 676,102.815 1.32 1,130.31 6,116.98 65.01 359.90 5,399.74 5,339.39 1,348.22 162.66 5,962,508.753 676,098.824 2.61 1,211.28 6,211.08 65.46 359.27 5,439.16 5,378.81 1,433.66 162.04 5,962,594.152 676,096.204 0.77 1,291.78 6,305.65 63.52 0.77 5,479.89 5,419.54 1,519.01 162.06 5,962,679.467 676,094.226 2.50 1,371.97 62112019 11:23:20AM Page 4 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-27B Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azl TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) N V) (usft) (usft) (usft) (usft) (usft) (ud) (.1100usft) (usft) 6,398.89 62.40 0.78 5,522.27 5461.92 1,602.05 153.18 5,962,762.504 678,093.404 1.20 1,449.62 6,493.56 62.89 3.02 5,565.76 5,505.43 1,686.08 165.97 5,962,846.570 676,094.227 2.16 1,527.63 6,587.39 62.73 5,49 5,608.66 5,548.31 1,769.30 172.17 5,962,929.909 676,098.467 2.35 1,603.71 6,681.24 63.70 4.36 5,650.95 5,590.60 1,852.77 179.35 5,963,013.518 676,103.699 1.49 1,679.69 6,775.21 63.41 5.44 5,692.80 5,63245 1,936.59 186.54 5,963,097.485 676,108.919 1.07 1,756.00 6,869.53 64.05 5.19 5,734.55 5,674.20 2,020.81 194.37 5,963,181.855 676,114.778 0.72 1,83246 6,964.41 62.86 845 5,776.95 5,716.60 2,105.25 202.98 5,963,266.464 676,121.400 1.73 1,908.86 7,058.03 63.41 6.02 5,819.26 5,758.91 2,188.27 212.04 5,963,349.670 676,128.522 0.72 1,983.77 7,152.03 64.95 5.91 5,860.20 5,799.85 2,272.42 220.84 5,963,434.003 676,135.341 1.64 2,059.85 7,246.21 64.29 6.34 5,900.56 5,840.21 2,357.03 229.92 5,963,518.790 676,142.435 0.81 2,136.24 7,339.83 64.22 6.19 5,941.23 5,880.88 2,440.85 239.12 5,963,602.801 676,149.672 0.16 2,211.86 7,434.46 64.95 5.45 5,981.84 5,921.49 2,525.88 247.78 5,963,688.005 676,156.343 1.05 2,288.80 7,528.69 65.59 4.62 6,021.26 5,960.91 2,611.14 255.29 5,963,773.408 676,161.854 1.05 2,366.35 7,622.63 66.15 5.28 6,059.67 5,999.32 2,696.55 262.69 5,963,858.963 676,167.250 0.88 2,444.08 7,716.33 64.12 4.94 6,099.06 6,038.71 2,781.22 270.27 5,963,943.783 676,172.838 2.19 2,521.05 7,810.04 63.41 5.41 6,140.49 6,080.14 2,864.93 277.85 5,964,027.646 676,178.456 0.88 2,597.13 7,904.29 64.36 4.62 6,181.98 6,121.63 2,949.23 285.24 5,964,112.093 676,183.875 1.26 2,673.81 7,998.24 65.07 4.43 6,222.10 6,161.75 3,033.92 291.94 5,964,196.905 676,188.591 0.78 2,751.10 8,092.62 66.02 3.54 6,261.18 6,200.83 3,119.62 297.91 5,964,282.719 676,192.550 1.32 2,829.59 8,185.97 64.87 3.89 6,299.97 6,239.62 3,204.35 303.41 5,964,367.547 676,196.065 1.28 2,907.33 8,279.30 62.95 4.11 5,341.01 6,280.66 3,287.96 309.26 5,964,451.267 676,199.950 2.07 2,983.90 8,373.92 63.50 4.09 6,383.64 6,323.29 3,372.22 315.30 5,964,535.639 676,204.015 0.58 3,061.01 8,467.93 63.93 3.57 6,425.27 6,364.92 3,456.32 320.93 5,964,619.843 676,207.673 0.67 3,138.12 8,561.83 64.67 3.37 6,465.99 6,405.64 3,540.78 326.05 5,964,704.389 676,210.815 0.81 3,215.73 8,655.73 62.91 5.76 6,507.46 6,447.11 3,624.74 332.74 5,964,788.485 676,215.537 2.95 3,292.34 8,749.74 62.05 4.62 6,550.90 6,490.55 3,707.77 340.28 5,964,871.661 676,221.135 1.41 3,367.78 8,844.09 63.78 5.32 6,593.86 6,533.51 3,791.45 347.56 5,964,955.486 676,226.454 1.95 3,443.93 6212019 11:23:26AM Page 5 COMPASS 5000.1 Build BID BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU ND Reference: RT @? 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-27B Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Asi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) P) (') (usR) (usf) (usR) (usR) (usR) (usft) ('1100usft) (usR) 8,938.08 66.75 5,04 6,633.18 6,572.83 3,876.46 355.27 5,965,040.646 676,232.165 3.17 3,521.17 9,032.88 66.82 4.88 6,670.55 6,610.20 3,963.26 362.80 5,965,127.591 676,237.663 0.17 3,600.16 9,126.64 66.16 6.25 6,707.95 6,647.60 4,048.83 371.13 5,965,213.326 676,243.991 1.51 3,677.72 9,220.47 64.88 6.40 6,746.83 6,686.48 4,133.70 380.54 5,955,298.392 676,251.407 1.37 3,754.26 9,315.73 6447 5.42 6,787.58 6,727.23 4,219.35 38941 5,965,384.216 676,258.266 1.02 3,831.70 9,409.35 64.48 5.29 6,827.92 6,767.57 4,303.46 397.29 5,965,468.486 676,264.178 0.13 3,908.05 9,503.33 64.62 4.92 6,868.31 6,807.96 4,387.99 404.84 5,965,553.157 676,269.747 0.39 3,984.89 9,597.68 64.78 5.17 6,908.63 6,848.28 4,472.95 412.34 5,965,638.274 676,275.256 0.29 4,062.17 9,691.72 64.75 5.73 6,948.72 6,888.37 4,557.64 420.42 5,965,723.115 676,281.350 0.54 4,138.98 9,786.60 65.02 5.48 6,988.99 6,928.64 4,643.13 428.81 5,965,808.781 676,287.735 0.37 4,216.46 9,879.34 63.61 6.92 7,029.19 6,968.84 4,726.22 437.83 5,965,892.047 676,294.806 2.07 4,291.44 9,973.49 59.85 9.12 7,073.78 7,013.43 4,808.31 449.37 5,965,974.381 676,304.418 4.49 4,364.64 10,066.93 55.90 10.62 7,123.46 7,063.11 4,886.26 462.91 5,966,052.619 676,316.127 4.44 4,433.25 10,161.82 52.30 12.66 7,179.09 7,118.74 4,961.53 478.39 5,966,128,227 676,329.834 4.17 4,498.69 10,255.91 48.33 14.71 7,239.17 7,178.82 5,031.87 495.47 5,966,198.944 676,345.270 4.54 4,558.95 10,348.99 46.30 17.36 7,302.28 7,241.93 5,097.62 514.35 5,966,265.116 676,362.595 3.02 4,614.2e 10,442.94 43.87 20.63 7,368.61 7,308.26 5,160.52 535.95 5,966,328.500 676,382.724 3.57 4,666.00 10,536.49 40.25 21.99 7,438.06 7,377.71 5,218.90 558.70 5,966,387.395 676,404.095 3.99 4,713.081 10,639.30 37.32 23.46 7,518.19 7,457.84 5,278.30 583.55 5,966,447.358 676,427.546 2.99 4,760.40 10,732.32 32.66 31.07 7,594.42 7,534.07 5,325.72 607.75 5,966,495.322 676,450.631 6.86 4,796.67 10,825.48 30.03 30.29 7,673.97 7,613.62 5,367.38 632.49 5,966,537.555 676,474.382 2.86 4,827.37 10,919.53 31.48 33.40 7,754.80 7,694.45 5,408.21 657.88 5,966,578.962 676,498.808 2.29 4,857.05 11,015.17 33.77 36.12 7,835.35 7,775.00 5,450.54 687.30 5,966,621.964 676,527.228 2.84 4,886.76 11,108.57 34.11 36.30 7,912.83 7,852.48 5,492.61 718.11 5,966,664.746 676,557.039 0.38 4,915.76 11,175.14 34.08 36.56 7,967.96 7,907.61 5,522.64 740.27 5,966,695.280 676,578.488 0.22 4,936.40 11,268.17 34.36 36.94 8,044.89 7,984.54 5,564.56 771.57 5,966,737.917 676,608.799 0.38 4,965.08 11,363.14 34.97 40.04 8,123.00 8,062.65 5,606.82 805.19 5,966,780.951 676,641.416 1.96 4,993.29 6/21/2019 11:23:20AM Page 6 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-278 Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Basting OLsg V. Sec (usft) (°) (') (usft) (usft) (usft) (usft) (usft) (usft) (wousft) (usft) 11,405.17 35.04 41.10 6,157.43 8,097.08 5,625.13 820.87 5,966,799.626 676,656.663 1.46 5,005.14 11,445.70 35.17 38.79 8,190.59 8,130.24 5,643.00 835.83 5,966,817.837 676,671.201 3.29 5,016.81 11,491.14 29.19 36.51 8,229.03 8,168.68 5,662.12 850.64 5,966,837.302 676,685.553 13.43 5,029.72 11,522.65 28.82 35.60 8,256.59 8,196.24 5,674.47 859.63 5,966,849.859 576,694.254 1.83 5,038.25 11,553.56 28.45 35.48 8,283.72 8,223.37 5,686.53 868.24 5,966,862.110 676,702.579 1.21 5,046.63 11,584.37 26.86 33.70 8,311.01 8,250.66 5,698.30 876.36 5,966,874.064 676,710.423 5.82 5,054.91 11,616.11 26.76 34.88 8,339.34 8,278.99 5,710.12 884.43 5,966,886.076 676,718.208 1.71 5,063.27 11,647.64 27.75 36.04 8,367.37 8,307.02 5,721.88 892.80 5,966,898.027 676,726.308 3.56 5,071.45 11,679.16 32.31 37.60 8,394.65 8,334.30 5,734.50 902.27 5,966,910.859 676,735.471 14.68 5,080.07 11,710.49 36.62 38.31 8,420.48 8,360.13 5,748.47 913.17 5,966,925.082 676,746.047 13.82 5,089.47 11,741.80 38.80 37.69 8,445.24 8,384.89 5,763.56 924.96 5,966,940.445 676,757.478 7.07 5,099.62 11,773.31 41.35 38.33 8,469.35 8,409.00 5,779.54 937.45 5,966,956.712 676,769.592 8.20 5,110.36 11,805.05 42.45 35.71 8,492.98 8,432.83 5,798.46 950.21 5,966,973.929 676,781.948 6.51 5,121,90 11,835.87 45.30 37.68 8,515.20 8,454.85 5,813.58 962.98 5,966,991.341 676,794.312 10.25 5,133.62 11,866.75 48.19 39.80 8,536.35 8,476.00 5,831.12 977.06 5,967,009.197 676,807.975 10.61 5,145.28 11,898.41 50.92 41.01 8,556.89 8,496.54 5,849.46 992.68 5,967,027.898 676,823.160 9.10 5,157.18 11,926.82 53.15 38.77 8,574.37 8,514.02 5,866.64 1,007.03 5,967,045.415 676,837.109 10.01 5,168.42 11,957.25 49.76 37.64 8,593.33 8,532.98 5,885.34 1,021.76 5,967,064.449 676,851.388 11.51 5,180.95 11,989.20 49.50 34.06 8,614.03 8,553.68 5,905.06 1,036.01 5,967,084.500 676,865.174 8.57 5,194.61 12,020.78 53.51 32,40 8,633.68 8,573.33 5,925.74 1,049.54 5,967,105.484 676,878.218 13.35 5,209.41 12,052.23 57.20 30.07 8,651.56 8,591.21 5,947.86 1,062.94 5,967,127.914 676,891.099 13.22 5,225.61 12,083.28 61.03 28.83 8,667.49 8,607.14 5,971.06 1,076.04 5,967,151.414 676,903.645 12.80 5,242.94 12,114.48 65.52 28.11 8,681.52 8,621.17 5,995.55 1,089.32 5,967,176.209 676,916.344 14.54 5,261.41 12,145.31 69.54 25.94 8,693.30 8,632.95 6,020.93 1,102.25 5,967,201.878 676,928.680 14.57 5,280.83 12,176.80 70.48 25.69 8,704.07 8,643.72 6,047.57 1,115.14 5,967,228.810 676,940.938 3.08 5,301.46 12,208.49 73.14 25.61 8,713.96 8,653.61 6,074.71 1,128.17 5,967,256.243 676,953.329 8.40 5,322.50 12,239.26 76.41 24.98 8,722.04 8,661.69 6,101.55 1,140.85 5,967,283.371 676,965.379 10.81 5,343.36 6/212019 11:23:20AM Page 7 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America -ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT 60.35usft (15-27A) Site: 15 MD Reference: RT 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-278 Survey Calculation Method: Minimum Curvature Design: 15-270 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 12,270.55 79.78 23.25 8,728.49 8,668.14 6,129.49 1,153.35 5,967,311.595 676,977.225 12.05 5,365.3E 12,301.53 84.81 22.44 8,732.65 8,672.30 6,157.77 1,165.27 5,967,340.148 676,988.473 16.44 5,387.87 12,333.41 89.00 23.26 8,734.37 8,674.02 6,187.10 1,177.63 5,967,369.756 677,000.141 13.39 5,411.20 12,364.85 91.88 22.29 8,734.13 8,673.78 6,216.08 1,189.80 5,967,399.015 677,011.627 9.67 5,434.27 12,398.02 93.28 21.99 8,732.72 8,672.37 6,244.92 1,201.53 5,967,428.122 677,022.683 4.59 5,457.36 12,427.56 93.80 22.15 8,730.78 8,670.43 6,274.10 1,213.36 5,967,457.562 677,033.824 1.72 5,480.73 12,458.99 94.38 22.64 8,728.53 8,668.18 6,303.08 1,225.30 5,967,486.817 677,045.085 2.41 5,503.88 12,490.31 94.93 22.05 8,725.99 8,665.64 6,331.96 1,237.17 5,967,515.958 677,056.273 2.57 5,526.95 12,521.41 95.93 19.68 8,723.05 8,662.70 6,360.88 1,248.20 5,967,545.134 677,066.618 8.24 5,550.37 12,554.46 94.73 18.88 8,719.98 8,659.63 6,391.94 1,259.06 5,967,576.438 677,076.752 4.36 5,575.84 12,585.07 92.43 18.36 8,718.07 8,657.72 6,420.89 1,268.82 5,967,605.606 677,085.825 7.70 5,599.70 12,615.87 91.95 18.08 8,716.89 8,656.54 6,450.13 1,278.44 5,967,635.056 677,094.760 1.80 5,623.88 12,647.52 92.19 16.42 8,715.75 8,655.40 6,480.33 1,287.82 5,967,665.471 677,103.428 5.30 5,649.06 12,679.48 92.29 15.21 8,714.50 8,654.15 6,511.06 1,296.52 5,967,696.390 677,111.409 3.80 5,674.96 12,710.70 92.94 13.33 8,713.07 8,652.72 6,541.28 1,304.21 5,967,726.784 677,118.386 6.37 5,700.73 12,742.62 94.63 12.15 8,710.97 8,650.62 6,572.35 1,311.23 5,967,758.002 677,124.680 6.45 5,727.52 12,773.54 95.14 11.93 8,708.33 8,647.98 6,602.48 1,317.66 5,967,788.272 677,130.399 1.80 5,753.63 12,803.94 95.55 11.91 8,705.50 8,645.15 6,632.09 1,323.91 5,967,818.024 677,135.955 1.35 5,779.32 12,836.84 94.87 12.84 8,702.51 8,642.16 6,664.09 1,330.93 5,967,850.180 677,142.225 3.49 5,806.99 12,867.85 93.46 13.03 8,700.26 8,639.91 6,694.24 1,337.86 5,967,880.474 677,148.440 4.59 5,832.95 12,897.87 93.73 13.17 8,698.38 8,638.03 6,723.42 1,344.65 5,967,909.804 677,154.545 1.01 5,858.05 12,929.68 94.04 13.27 8,696.22 8,635.87 6,754.31 1,351.90 5,967,940.860 677,161.077 1.02 5,884.60 12,961.82 91.74 12.83 8,694.60 8,834.25 6,785.58 1,359.15 5,967,972.287 677,167.589 7.29 5,911.50 12,993.26 89.58 11.22 8,694.24 8,633.89 6,816.33 1,365.70 5,968,003.175 677,173.416 8.57 5,938.15 13,025.27 90.09 10.60 8,694.33 8,633.98 6,847.76 1,371.76 5,968,034.737 677,178.737 2.51 5,965.62 13,054.59 91.74 7.80 8,693.87 8,633.52 6,876.69 1,376.45 5,968,063.772 677,182.744 11.08 5,991.21 13,086.62 92.67 7.53 8,692.63 8,632.28 6,908.41 1,380.71 5,968,095.581 677,186.269 3.02 6,019.55 621/2019 11:23:20AM Page 8 COMPASS 5000.1 Build 81D 50 BP Final Survey Report Company: North America - ALASKA - BP Local Coareinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15�27A) Site: 15 MD Reference: RT Q 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-278 Survey Calculation Method: Minimum Curvature Design: 15-276 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc An TVD TVDSS NIS E/W Northing Easting DLsg V. Sec (usft) (') O (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 13,118.10 92.80 6.93 8,691.13 8,630.78 6,939.61 1,384.67 5,968,126.858 877,189.495 1.95 6,047.51 13,148.94 91.88 3.36 8,689.87 8,629.52 6,970.29 1,387.43 5,968,157.597 677,191.538 11.94 6,075.40 13,179.56 90.47 1.59 8,689.24 8,628.89 7,000.87 1,388.76 5,968,188.200 677,192.143 7.39 6,103.69 13,211.33 89.65 0.78 8,689.21 8,628.86 7,032.64 1,389.41 5,968,219.968 677,192.056 3.63 6,133.31 13,243.74 88.31 357.78 8,689.79 8,629.44 7,065.04 1,389.01 5,968,252.345 677,190.890 10A41 6,16389 13,274.04 88.14 356.04 8,690.73 8,630.38 7,095.28 1,387.37 5,968,282.537 677,188.550 5.77 8,192.87 13,305.25 88.00 354.77 8,691.78 8,631.43 7,126.37 1,384.88 5,968,313.559 677,185.324 4.09 6,222.94 13,334.94 86.28 353.68 8,693.26 8,632.91 7,155.87 1,381.89 5,968,342.980 677,181.651 6.86 6,251.68 13,368.41 85,84 351.21 8,695.56 8,635.21 7,188.97 1,377.50 5,968,375.964 677,176.488 7.48 6,284.28 13,400.06 86.42 348.75 8,697.70 8,637.35 7,220.06 1,372.01 5,968,406.919 677,170.268 7.97 6,315.38 13,432.29 87.07 346.13 8,699.53 8,639.18 7,251.46 1,365.01 5,988,438.148 677,162.538 8.36 6,347.29 13,463.42 87.49 34543 8,701.00 8,640.65 7,281.61 1,357.37 5,968,468.102 677,154.196 2.62 6,378.22 13,495.24 8742 342.44 8,702.42 8,642.07 7,312.15 1,348.58 5,968,498.430 677,144.688 9.39 6,409.93 13,525.89 86.11 341.70 6,704.15 8,643.80 7,341.26 1,339.16 5,968,527.313 677,134.589 4.91 6,440.51 13,553.86 84.35 339.69 8,706.47 8,646.12 7,367.57 1,329.94 5,966,553.392 677,124.763 9.53 6,468.38 13,588.44 83.94 337.26 8,710.00 8,649.65 7,399.57 1,317.32 5,968,585.084 677,111.398 7.09 6,502.77 13,619.20 86.04 335.42 8,712.69 8,652.34 7,427.63 1,305.03 5,968,612.850 677,098.448 9.06 6,533.34 13,651.35 89.48 335.47 8,713.94 8,653.59 7,456.85 1,291.68 5,968,641.744 677,084.421 10.70 6,565.36 13,682.76 91.95 333.10 8,713.55 8,653.20 7,485.14 1,278.05 5,968,669.708 677,070.137 10.90 6,596.61 13,713.56 92.15 331.69 8,712.45 8,852.10 7,512.41 1,263.79 5,968,696.640 677,055.241 4.62 6,627.12 13,744.20 89.85 331.09 8,711.91 8,651.56 7,539.31 1,249.12 5,968,723.180 677,039.948 7.76 6,657.41 13,777.66 87.55 328.56 6,712.67 8,652.32 7,568.22 1,232.32 5,968,751.694 677,022.470 10.17 6,690.33 13,807.30 88.10 325.14 8,713.80 8,653.45 7,593.02 1,216.13 5,968,776.104 677,005.705 11.75 6,719.17 13,838.85 89.92 324.33 8,714.34 8,653.99 7,618.78 1,197.91 5,968,801.424 676,986.896 6.31 6,749.60 13,869.79 90.40 324.39 8,714.26 8,653.91 7,643.92 1,179.89 5,968,826.138 676,968.285 1.56 6,779.39 13,902.64 90.57 323.56 8,713.98 8,653.63 7,670.49 1,160.57 5,968,852.243 676,948.350 2.58 6,810.96 13,932.57 90.57 323.58 8,713.68 8,653.33 7,694.57 1,142.79 5,968,875.898 676,930.020 0.07 6,839.67 8212019 11:23:20AM Page 9 COMPASS 5000.1 Build BID bp Final BP Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-27B Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCPt Survey MD Inc AN TVD TVDSS N/S E/W Northing Easting DLeg V. See (usft) r) (°) (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 13,964.51 90.64 324.19 8,713.34 8,652.99 7,720.37 1,123.97 5,968,901.250 676,910.597 1.92 6,870.35 13,996.08 90.40 324.25 8,713.06 8,652.71 7,745.98 1,105.51 5,968,926.419 676,891.546 0.78 6,900.73 14,026.42 90.47 325.97 8,712.83 8,652.48 7,770.86 1,088.16 5,968,950.889 676,873.616 5.67 6,930.05 14,058.92 90.54 324.86 8,712.54 8,652.19 7,797.62 1,069.71 5,968,977.204 676,854.549 3.42 6,961.50 14,090.37 90.54 325.22 0,712.24 8,651.89 7,823.39 1,051.69 5,969,002.547 676,835.931 1.14 6,991.88 14,121.63 90.64 325.54 8,711.92 8,651.57 7,849.12 1,033.93 5,969,027.846 676,817.576 1.07 7,022.13 14,153.57 90.78 326.63 8,711.53 8,651.18 7,875.62 1,016.11 5,969,053.923 676,799.142 3.44 7,053.13 14,184.06 90.88 325.44 8,711.08 8,650.73 7,900.90 999.08 5,969,078.800 676,781.523 3.92 7,082.72 14,214.30 89.99 327.24 6,710.85 8,650.51 7,926.07 982.32 5,969,103.567 676,764.180 6.64 7,112.10 14,246.02 89.10 327.24 8,711.11 8,650.76 7,952.75 965.16 5,969,129.830 676,746.398 2.81 7,143.03 14,278.17 89.68 326.50 8,711.45 8,651.10 7,979.67 947.59 5,969,156.331 676,728.203 2.92 7,174.34 14,308.98 88.89 327.50 8,711.83 8,651.48 8,005.50 930.81 5,969,181.766 676,710.825 4.14 7,204.36 14,340.50 87.18 328.12 8,712.91 8,652.56 8,032.16 914.03 5,969,208.022 676,693.426 5.77 7,235.15 14,371.90 85.84 328.34 8,714.83 8,654.46 8,058.81 897.53 5,969,234.272 676,676.306 4.32 7,265.83 Tie In Point 14,403.00 86.36 328.22 8,716,94 8,656.59 8,085.20 881.21 5,969,260.274 676,659,380 1.72 7,296.21 -. KOP - Top of Whipstock 14,420.21 85.42 327.15 8,718.17 8,657.82 8,099.71 872.04 5,959,274.561 676,649.867 8.26 7,312.98 Interpolated Azimuth 14,450.53 83.05 325,32 8,721.22 8,660.87 8,124.78 855.27 5,969,299.236 676,632.522 9.86 7,342.28 Interpolated Azimuth 14,480.22 8274 323.52 8,724.89 8,664.54 8,148.74 838.13 5,969,322.787 676,614.826 6.11 7,370.66 First Good Survey 14,511.26 83.61 323.62 8,728.58 8,668.23 8,173.54 819.83 5,969,347.148 676,595.949 2.82 7,400.22 14,542.87 85.36 321.57 8,731.62 8,671.27 8,198.53 800.72 5,969,371.682 676,576.259 8.50 7,430.24 14,573.43 86.78 318.67 8,733.71 8,673.36 8,221.92 781.17 5,969,394.609 676,556.172 10.55 7,458.91 14,601.35 86.80 316.10 8,735.25 8,674.90 8,242.44 762.30 5,969,414.674 676,536.824 9.20 7,484.64 14,636.32 88.43 313.76 8,736.68 8,676.33 8,267.11 737.56 5,969,438.761 676,511.520 7.99 7,516.28 62112019 11:23:20AM Page 10 COMPASS 5000.1 Build 810 50 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-27B Survey Calculation Method: Minimum Curvature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azl TVD TVDSS N/S EAN Northing Easting DLeg V. Sec (usft) C) PI (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 14,661.34 88.44 311.53 8,737.36 8,677.01 8,284.06 719.17 5,969,455.267 676,492.734 8.91 7,538.5C 14,691.43 89.85 310.24 8,737.81 8,677.46 8,303.75 696.42 5,969,474.420 676,469.535 6.35 7,564.78 14,721.50 9071 308.84 8,737.66 8,677.31 8,322.89 673.23 5,969,493.012 676,445.906 5.46 7,590.70 14,755.44 92.06 308.02 8,736.84 8,676.49 8,343.98 646.65 5,969,513.472 676,418.843 4.65 7,619.61 14,781.40 91.69 305.07 8,735.99 8,675.64 8,359.43 625.81 5,969,528.426 676,397.646 11.45 7,641.25 14,811.38 92.88 303.31 8,734.80 8,674.45 8,376.26 601.03 5,969,544.673 676,372.482 7.08 7,665.54 14,840.65 93.41 302.17 8,733.19 8,672.84 8,392.07 576.45 5,969,559.898 676,347.538 4.29 7,688.80 14,871.19 91.84 298.89 8,731.79 8,671.44 8,407.56 550.16 5,969,574.772 676,320.910 11.90 7,712.35 14,900.65 91.72 295.90 8,730.88 8,670.53 8,421.11 524.04 5,969,587.703 676,294.461 10.15 7,734.02 14,935.10 91.07 291.83 8,730.04 8,669.69 8,435.04 492.55 5,969,600.891 676,262.657 11.96 7,757.88 14,960.94 92.92 291.15 8,729.14 8,668.79 8,444.50 468.52 5,969,609.785 676,238.416 7.63 7,774.99 14,990.95 92.86 289.84 8,727.63 8,667.28 8,454.99 440.45 5,969,619.618 676,210.105 4.36 7,794.45 15,020.92 91 So 289.23 8,726.46 8,666.11 8,465.00 412.22 5,969,628.967 676,181.658 4.67 7,813.51 15,050.75 91.72 287.25 8,725.60 8,665.25 8,474.34 383.91 5,969,637.634 676,153.131 6.65 7,831.97 15,081.48 91.32 285.49 8,724.78 8,664.43 8,482.99 354.43 5,969,645.598 676,123.466 5.87 7,850.18 15,113.18 90.68 283.25 8,724.23 8,663.88 8,490.86 323.73 5,969,652.742 676,092.590 7.35 7,868.08 15,140.77 91.90 281.94 8,723.61 8,663.26 8,496.87 296.81 5,969,658.124 676,065.540 6.49 7,882,93 15,170.76 93.59 281.06 8,722.17 8,661.82 8,502.85 267.46 5,969,663.407 676,036.058 6.35 7,898.59 15,195.77 91.23 280.67 8,721.12 8,660.77 8,507.56 242.92 5,969,667.540 676,011.418 9.56 7,911.40 15,220.62 90.18 279.98 8,720.81 8,660.46 8,512.01 218.48 5,969,671.420 675,986.876 5.06 7,923.95 15,250.48 88.77 283.45 8,721.09 8,660.74 8,518.07 189.25 5,969,676.795 675,957.513 12.54 7,939.64 15,282.18 88.47 286.99 8,721.85 8,661.50 8,526.39 158.67 5,969,684.394 675,926.754 11.20 7,957.92 15,310.93 88.40 289.14 8,722.64 8,662.29 8,535.30 131.35 5,969,692.663 675,899.234 7.48 7,975.63 15,344.92 88.31 29447 8,723.61 8,663.26 8,547.92 99.82 5,969,704.536 675,867.415 15.68 7,998.27 15,370.94 88.43 298.46 8,724.35 8,664.00 8,559.51 76.54 5,969,715.576 675,843.873 15.34 8,017.13 15,400.35 88.90 302.96 8,725.04 8,664.69 8,574.52 51.27 5,969,729.991 675,818.257 15.38 8,039.68 15,432.10 89.42 307.37 8,725.50 8,665.15 8,592.80 25.32 5,969,747.656 675,791.892 13.98 8,065.93 &212019 11:23:20AM Page 11 COMPASS 5000.1 Build 81D a BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: 15-276 Survey Calculation Method: Minimum CuNature Design: 15-27B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EM7 Northing Starting DLeg V. Sec (usft) (") 0 (usft) (usft) (usft) (usft) (waft) (usft) (°1100usR) (waft) _ 15,46545 88.19 311.68 8,726.20 8665.85 8,614.01 -0.39 5,969,768.261 675,765.692 1344 8,094.6E 15,491.61 88.68 316.36 8,728.92 8,666.57 8,632.18 -19.19 5,969,785.982 675,746.473 17.98 8,118.16 15,522.86 88.74 320.37 8,727.62 8,667.27 8,655.52 -39.94 5,969,808.833 675,725.181 12.83 8,147.19 15,550.61 87.27 322.36 8,728.58 8,668.23 8,677.18 -57.26 5,969,830.082 675,707.366 8.91 8,173.47 15,580.31 86.96 325.11 8,730.08 8,669.73 8,701.10 -74.80 5,969,853.577 675,689.267 9.31 8,201.94 15,611.39 89.02 327.40 8,731.17 8,670.82 8,726.92 -92.05 5,969,878.969 675,671.417 9.91 8,232.11 15,640.18 91.35 329.98 8,731.08 8,670.73 8,751.52 -107.01 5,969,903.224 675,655.887 12.07 8,260.34 15,670.37 91.66 331.44 8,730.28 8,669.93 8,777.84 -121.78 5,969,929.190 675,640.511 4.94 8,290.12 15,700.11 92.43 333.33 8,729.22 8,668.87 8,804.17 -135.55 5,969,955.192 675,626.123 6.86 8,319.58 15,730.25 93.35 335.10 8,727.70 8,667.35 8,831.27 -148.65 5,969,981.979 675,612.400 6.81 8,349.52 15,760.88 93.35 338.67 8,725.91 8,665.56 8,859.39 -160.65 5,970,009.807 675,599.743 11.64 8,380.05 15,792.68 91.75 339.43 8,724.50 8,664.15 8,889.06 -172.01 5,970,039.198 675,587.694 5.57 8,411.81 15,822.79 91.54 337.14 6,723.83 8,663.28 8,917.02 -183.14 5,970,066.888 675,575.908 7.63 8,441.90 15,850.85 93.84 336.30 8,722.32 8,661.97 8,942.76 -194.22 5,970,092.365 675,564.232 8.73 6,469.88 15,882.05 93.35 334.54 6,720.38 8,660.01 8,971.08 -207.17 5,970,120.368 675,550.621 5.84 8,500.92 15,910.60 90.74 330.76 8,719.34 8,658.99 8,996.42 -220.28 5,970,145.388 675,536.927 16.08 8,529.2C 15,940.81 91.60 328.21 8,718.72 8,658.37 9,022.43 -235.61 5,970,171.038 675,520.988 8.91 8,558.90 15,973.86 89.72 324.29 8,718.34 8,657.99 9,049.91 -253.97 5,970,198.070 675,501.995 13.15 8,590.99 16,000.54 90.83 323.30 8,718.22 8,657.87 9,071.43 -269.73 5,970,219.221 675,485.738 5.57 8,616.61 16,025.53 92.61 323.87 8,717.47 8,657.12 9,091.53 -284.55 5,970,238.968 675,470.444 7.48 8,640.57 16,050.69 93.07 326.56 8,716.22 8,655.87 9,112.17 -298.89 5,970,259.262 675,455.631 10.83 8,664.86 16,080.49 91.60 329.88 8,715.00 8,654.65 9,13748 -314.57 5,970,284.193 675,439.366 12.18 8,694.01 16,110.70 91.53 333.18 8,714.18 8,653.83 9,164.02 -328.96 5,970,310.390 675,424.355 10.92 8,723.87 16,140.71 91.17 335.91 8,713.47 8,653.12 9,191.11 -341.85 5,970,337.166 675,410.832 9.17 8,753.74 16,170.62 91.13 339.36 8,712.87 8,652.52 9,216.76 -353.23 5,970,364.540 675,398.811 11.53 8,783.61 16,200.79 90.92 342.57 8,712.33 8,651.98 9,247.27 -363.07 5,970,392.812 675,388.310 10.66 8,813.77 16,230.89 91.29 345.91 8,711.75 8,651.40 9,276.23 -371.24 5,970,421.570 675,379.462 11.16 8,843.77 6212019 11:23:20AM Page 12 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: PBU Reference: Site: 15 Well: 15-27 Wellbore: 15-278 Design: 15-27B Survey MD Inc (usft) l°) 16,260.97 91.01 16,290.86 91.44 16,320.71 91.44 16,350.72 91.11 16,380.40 92.27 16,411.06 92.70 16,440.92 91.26 16,475.80 91.81 16,512.00 91.81 Projeciton to TO BP Final Survey Report 621/2019 11: 23: 20AM Page 13 COMPASS 5000.1 Build 81D Local Coordinate Reference: Well 15-27 TVD Reference: RT @ 60.35usft (15-27A) MD Reference: RT @ 60.35usft (15-27A) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) _ 349.23 8,711.15 8,650.80 9,305.59 -37771 5,970,450.773 675,372.304 11.07 8873.5E 352.58 8,710.51 8,650.16 9,335.10 -382.44 5,970,480.156 675,366.892 11.30 8,902.92 355.62 8,709.76 8,649.41 9,364.77 -385.50 5,970,509.753 675,363.131 10.18 8,931.86 359.00 8,709.09 8,648.74 9,394.74 -386.91 5,970,539.675 675,361.022 11.31 8,960.50 2.36 8,708.21 8,647.66 9,424.40 -386.56 5,970,569.333 675,360.679 11.97 8,988.25 4.52 8,706.88 8,646.53 9,454.97 -384.72 5,970,599.940 675,361.800 7.18 9,016.35 7.86 8,705.85 8,645.50 9,484.64 -381.50 5,970,629.669 675,364.322 12.17 9,043.13 10.57 8,704.92 8,644.57 9,519.05 -375.92 5,970,664.202 675,369.097 7.93 9,073.56 10.57 8,703.77 8,643.42 9,554.62 -369.28 5,970,699.913 675,374.899 0.00 9,104.71 621/2019 11: 23: 20AM Page 13 COMPASS 5000.1 Build 81D Pmjnt PBU aammsemexom w LLBOREDETAiL3: 1S27e RE ENCEIWD TNM N Nan:ra SBs: 16 ry.Wrw 1527Bmaaineie(nR rOn WO 159. Tme Nam Well: 16-17 se.yNnnssr VM.CVDlflelaa,8'. nTBm35wn1152]n) WNRwm: 169B p1e 1527A NS)RO.. Apmal: 1698 Meawea PT��Vxanl nRl were: T..MD: 14371.90 teas.., WmW. wwnumC. AOGCC Offsets within 500ft Fasting (500 usMn) Fasting (500 usNin) �q6+640 �P North America - ALASKA - BP PBU 15 15-27 15-27B 15-27B 500292224302 AOGCC Offset Well Report 21 June, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: 15 Site Error: 0.00usft Reference Well: 15-27 Well Error. 0.00usft Reference Wellbore 15-27B Reference Design: 15-27B BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-27 RT @ 60.35usft (15-27A) RT @ 60.35usft (15-27A) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference 15-27B Fiber type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To Interpolation Method: MD Interval t00.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,848.56usft Error Surface: Elliptical Conic Survey Program Date 6/21/2019 From To lush) lush) Survey (Wellbore) Tool Name Description 431.35 3,440.35 15-27 Srvy 1 MWD (15-27) MWD MWD - Standard 3,705.00 4,213.00 15-27APB1 Srvy 1 GYD GC SS (15-27AP GYD-GC-SS Gymdata gyro single shots 4,307.01 11,405.1715-27APB1 Srvy 2 MWD+IFR+MS(15-27A MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 11,445.70 11,898.41 15-27APB1 SrW 3 MWD+IFR+MS (15-27A MWD+IFR+MS-WOCA MWD + IFR +Muth Station W/O Crustal 11,926.82 14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A) MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal 14,403.00 16,512.00 Survey#1 (15-27B) MWD MWD -Standard 61212019 11:29:15AM Page 2 of 4 COMPASS 5000.1 Build BID BP by Anticollision Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: RT @ 60.35usft (15-27A) Reference Site: 15 MD Reference: RT @ 60.35usft (15-27A) Site Error: O.00usft North Reference: True Reference Well: 15-27 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore 15-27B Database: EDM RSK-Alaska PROD -ANCP1 Reference Design: 15-27B Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well -Wellbore - Design (usft) (usft) (usft) 75 15-05 - 15-05 - 15-05 4,093.46 4,200.00 594.60 15 -05 -15 -OSA -15-05A 4,093.46 4,200.00 594.60 15-05 - 15-05APB1 - 15-05APB1 4,093.46 4,200.00 594.60 15-05 - 15-050 - 15-058 4,093.46 4,200.00 594.60 15-05 - 15-05BPB1 - 15-05BPB1 4,093.46 4,200.00 594.60 15-06 - 15-06 - 15-06 4,168.70 4,300.00 304.80 15 -06 -15 -06A -15-06A 4,168.70 4,300.00 304.80 15-06 - 15-06APB1 - 15-06APBI 4,168.70 4,300.00 304.80 15-16 - 15-16 - 15-16 4,027.65 4,100.00 306.90 15 -16 -15 -16A -15-16A 4,027.65 4,100.00 306.90 15-16 - 15-16B - 15-16B 4,034.58 4,100.00 306.88 15-16 - 15-16BPB1 - 15-16BPBI 4,034.58 4,100.00 306.88 15-16 - 15-16C - 15-16C 4,034.58 4,100.00 306.88 15-16 - 15-16CPB1 - 15-16CPB1 4,034.58 4,100.00 306.88 15-16 - 15-16CPB2 - 15-16CPB2 4,034.58 4,100.00 306.88 15-17 - 15-17 - 15-17 3,915.59 4,000.00 125.87 15-18 - 1578 - 15-18 2,067.00 2,100.00 163.01 15 -18 -15 -18A -15-18A 2,087.00 2,100.00 163.01 15-19 - 15-19 - 15-19 4,001.14 4,000.00 165.37 15 -19 -15 -19A -15-19A 4,001.14 4,000.00 165.37 15-21 - 1521 - 15-21 1,389.67 1,400.00 31.49 15 -21 -15 -21A -15-21A 1,396.69 1,400.00 32.05 15-22 - 1522 - 15-22 392.50 400.00 63.86 1527 - 1527 - 15-27 4,093.59 4,100.00 2.74 15 -27 -15 -27A -15-27A 14,687.91 14,700.00 55.63 15-27 - 15-27APBI - 15-27APB1 12,232.28 12,270.00 93.02 15-28 - 15-28 - 15-28 691.72 700.00 121.34 15-28 - 15-28A - 15-28A 691.72 700.00 121.34 1528 -15 -28B -15-28B 13,241.12 13,900.00 95.33 15-28- 15-28BPB1 - 15-288PB1 691.72 700.00 121.34 15-28 - 15288PB2 - 15288PB2 691.72 700.00 121.34 15-29 - 15-29 - 15-29 192.24 200.00 180.80 15-29 - 15-29A- 15-29A 192.24 200.00 180.80 15-29 - 15-29APB1 - 15-29APB1 192.24 200.00 180.80 1549 - 15-298 - 15-298 198.06 200.00 180.86 15-29-15-29BPB1-15-29BPB1 198.06 200.00 180.86 15-33 - 15-33 -15-33 2,875.53 2,900.00 124.71 15 -33 -15 -33A -15-33A 2,875.53 2,900.00 124.71 15-33 - 15-338 - 15338 2,875.53 2,900.00 124.71 15-33 - 15-33C - 1533C 2,875.53 2,900.00 124.71 15-33 - 15-33PB1 - 15-33PBI 2,875.53 2,900.00 124.71 15-33-15-33PB2-1533PB2 2,875.53 2,900.00 124.71 15-41 - 1541 - 15-41 7,652.51 7,600.00 463.09 15 -41 -1541A -1541A 7,652.51 7,600.00 463.09 1541 - 15-41 B - 1541 B 7,652.51 7,600.00 463.09 15-41 - 15-41 BPB1 - 1541 BP81 7,652.51 7,600.00 463.09 15-43 - 15-43 - 1543 595.88 600.00 245.32 15-44 - 15-44 - 1544 1,677.92 1,700.00 190.75 1545 - 1545 - 1545 1,471.92 1,500.00 191.36 1545 - 1545A- 1545A 1,471.92 1,500.00 191.36 1545 - 15-45APBI - 1545APB1 1,471.92 1,500.00 191.36 15-45 - 1545APB2 - 1545AP62 1,471.92 1,500.00 191.36 15-45 - 1545B - 15458 1,471.92 1,500.00 191.36 6212019 11:29:15AM Page 3 of 4 COMPASS 5000.1 Build 81D .e Company: North America - ALASKA - BP Project: PBU Reference Site: 15 Site Error: 0.00usft Reference Well: 1527 Well Error: 0.00usft Reference Wellbore 15278 Reference Design: 15278 Summary Site Name Offset Well - Wellbore- Design 15 15-45- 15-455PB1 - 15456PB1 15-45 - 15-45C - 15-45C 15-45 - 15-45CPBI - 1545CPB1 15-45 - 1545D - 15-45D 15-45-1545DPB1-1545DPB1 15-45 - 1545P01 - 1545PB1 15-46 - 1546 - 15-46 15-46 - 154611 - 1546LI 15-46-154611 PB1-15461-1 PB1 15-49 - 1549 - 15-49 15-49 - 1549A- 1549A 15-49-15-49APBI-1549AP81 15-49 - 15498 - 15498 15-49 - 1549C - 15-49C 1549-1549PB1-1549PB1 K K-10 - K -10D - K -10D K-10 - K-10DPB1 - K-10DP81 BP Anticollision Report Local Co-ordinate Reference: Well 15-27 TVD Reference: RT @ 60.35usft (15-27A) MD Reference: RT @ 60.35usft (1527A) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K-Alaska PROD -ANCP1 Offset TVD Reference: Offset Datum Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 1,471.92 1,500 00 191.36 1,471.92 1,500 00 191.36 1,471.92 1,500.00 191.36 1,471.92 1,500.00 191.36 1,471.92 1,500.00 191.36 1,471.92 1,500.00 191.36 1,768.74 1,800.00 93.79 1,768.74 1,800.00 93.79 1,768.74 1,800.00 93.79 1,091.38 1,100.00 259.69 1,091.38 1,100.00 259.69 1,091.38 1,100.00 259.69 1,091.38 1,100.00 259.69 1,091.38 1,100.00 259.69 1,091.38 1,100.00 259.69 14,851.88 15,325.00 664.71 14, 917.29 14,313.00 1,504.23 62112019 1129: 15AM Page 4 of 4 COMPASS 5000.1Build 81D BA �� PRINT DISTRIBUTION LIST t UGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 15-27B FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider@bhge.com STATUS COMPANY Final Replacement: ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION 4 1 I BP North Slope. EOA, PBOC. PRB-20 (Office 1091 D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ,Attn: Nancy Landi 2190 45 30 96 2 ase sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. :rotechnical Data Center, 1-112-1 ) E. Benson Blvd. :h, AK 99508 or GANCPDC@bp365.onmicrosoft.com LOG TYPE GR - RES LOG DATE June 21, 2019 TODAYS DATE July 3, 2019 Revision No Details: Rev. Requested by: FIELD/ FINAL CD/DVDF,ETA, D FINAL PRELIM (las, d1Ch PM I SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTSFur rKIN # OF COPIES IF OF COPIES # OF COPIES 01 01 1 11 0 RECEIVED 0 1 1 1 1 1 0 1 0 0 1 0 1 1 1 0 0 TOTALS FOR THIS PAGE: 0 2 4 2 0 i THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-27B BP Exploration (Alaska), Inc. Permit to Drill Number: 219-045 Surface Location: 324' FNL, 58' FWL, SEC. 22, TI 1N, R14E, UM Bottomhole Location: 3950' FSL, 251' FEL, SEC. 09, THN, R14E, UM Dear Mr. Mclaughlin: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, l 2:sie L. Chmielowski Commissioner DATED this L day of April, 2019. IIGVL_1 V LCL/ STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL MAR 2 6 2019 20 AAC 25.005 Is. Type of Work: ib. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify iflyeljiq fyr% Drill ❑ Lateral ❑ Stratigrephic Test ❑ Development - Oil 0. Service - Wnj ❑ Single Zone 0• Coalbed Ga s(`.M�Ydtl1IMh�R6 m Redrill 0- Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 PBU 15-27B - 3 Address: 6. Proposed Depth: 12. FieldlPool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 16536' • TVD: 8666'ss PRUDHOE BAY, PRUDHOE OIL 4a Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028306 8 028303 8, DNR Approval Number: 13. Approximate spud date: Surface: 324' FNL, 58' FVVL, Sec.22, TllN, R74E, UM 478' FSL, 1202' FVWL, Sec. 10, TI IN, R14E, UM 78-084 June 1, 2019 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 3950' FSL, 251' FEL, Sec. 09, T11 N. R74E, UM 7165 4b Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 60.35. feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 675968 • y- 5961157 Zone - ASP 4 GL bove Elevation aMSL: 3220 •feet 16. Deviated wells: Kickoff Depth: 14400 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 93 degrees Downhole: 3370 • Surface: 2500 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hale Casinq Weidhl Grade I Coupling Len th MD TVD MD TVD (includinq stage data) 4-112" -1/2"x2-7/8" 93#/6.5# 13Cr85 STUHYD511 5200 11310' 8019'ss 16510' 8667'ss Uncemented Liner w/ACID &Swell x2-3/8" /4.7# Packers 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured). Effect. Depth MD (8): Effect. Depth TVD (ft): Junk (measured): 14870 8732 11903 11903 8560 None Casing Length Size Cement Volume MD TVD Concluctor/Structural 80 20" 232 ou It Coldest II 29-109 29-109 Surface 3457 13-3'8" 2584 cu It Coldest III. 460 cu If Class'G' 29-3486 29-3485 Intermediate 3784 am.. 2780 cu It Class'G' 26-3810 26-3809 Liner 7788 7• 221 cu It Class'G'. 422 cu H Class'G' 3658-11446 3657-8191 Liner 3591 4-1/2' 505 cu it Class'G' 11271 - 14862 8047-8732 Perforation Depth MD (ft): 11462 -14720 Perforation Depth TVD (ft): 8204-8729 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Hartlev. Josephine from without prior written approval. Contact Email Josephine.Hartley(8)bp.cem Authorized Name Mclaughlin, Sean M Authorized Title Engine -ng Team Lead - CTD & RWO Phone +1 9075644570 QContact Z S J/_Z5 Authorized Signature ,/-'- Date Commission Use Only Permit to Drill Permit Approval See cover letter for other Number: `J�7 API: 50- 029-22243-02A0' Date: requirements: Conditions of approval : If box is checked, welt may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: OthecV(A�ETE23•r'%b 35oOR!S Samples req'd: Yes ❑ IN W Mud log req'd: Yes ❑/ No 63' H2S measures Yes [2/ No ❑ Directional svy req'd: Yes C3 No 0 Spacing exception mq'd: Yes ❑ No Inclination -only svy req'd: Yes ❑ No 5 Post initial injection MIT req'd: Yes ❑ No 11/O /n' q -S'OfJ 5✓dh* e ��1/�� �rif�K/ BY APPROVED Approved by: COMMISSIONER THE COMMISSION Date: I. 1 Form 10401 Revi 1 5/2017 This permit is valid for 24 months from the date of approval (20 AAC 25.005(9)) Submit Farm and M�QIIA9R� AftachmarrtsinDuplicate To: Alaska Oil & Gas Conservation Commission From: Josi Hartley CTD Engineer Date: March 25, 2019 Re: 15-27B Permit to Drill Request Obp Approval is requested for a permit to drill a CTD sidetrack from well 15-27A with the Nabors CDR2 Coiled Tubing Drilling rig on or around June 19, 2019. Proposed plan for 15-27B: The sidetrack 15-27B will be a 2136' horizontal CST that will kick -out from the 15-27A Ivishak producer. The CST will be drilled to the north and will target remaining oil potential that has not yet been recovered in existing completions in Zone 1. The well will utilize an open hole Autonomous Inflow Control Device (AICD) completion to manage the high gas volumes that are expected from a GD well. The sidetrack will be drilled on or around June 1", 2019. The rig will move in, test BOPE and kill the well. The 3.80" window will be milled off a 4-1/2" monobore whipstock set pre - rig. The well kicks -off in Zone 1, geo steer low in section and potentially dip into the stratigraphic BSAD. The proposed sidetrack will be completed with 2-3/8" x 2-7/8" x 3-1/2" 13CR liner with an AICD and swell packer completion. Rig Work (scheduled to begin June 1", 2019) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2500 psi). 2. Mill 3.80" Window + 10' of rathole. 3. Drill production lateral: 4.25" OH, ^2136' (12 deg DLS planned). ' 4. Run 3-1/2" x 2-7/8" x 2-3/8" 13Cr liner with Swell Packers and AICDs to TD. 5. Freeze protect well to a min 2,200' TVDss. 6. Close in tree, RDMO. s Post -Rig Work: 1. V: Tree work as needed. 2. SL: Drift and Set LTP. Set and test LTP 3. FB: PT LTP. 4. CT: RPM. N2 Lift. 5. T: Test wel I. Set KO Gas Lift Design for potential PBGL. Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (430 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >ll must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-3/8", 4.7#, HYD 511, 13Cr liner with AICDs and Swell Packers: 15,175' MD -16,510' MD • 2-7/8", 6.5#, STL, 13Cr solid liner: 14,390' MD -15,175' MD • 3-1/2", 9.3#, STL 13Cr solid liner: 11,310' MD -14,390' MD • The primary barrier for this operation: a minimum EMW of 8.4 ppg (430 psi over -balance). ✓ • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 96', inclination at kickoff point is 86'. • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property -17,165' ' • Distance to nearest well within pool —615' (15-29A) Logging: MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Gamma Ray / CCL / RPM log planned post -rig through the entire production liner. Perforating: • No perforating is planned for this well. AICD/Swell Packer completion. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • DS 15 is considered an H2S pad. Most recent H25 reading on 15-27A: 12 ppm (09/28/18). Maximum H2S reading on the pad: 50 ppm on 15-21A (2/24/01). • Lost circulation risk on 15-27B is considered Low. Reservoir Pressure: • The reservoir pressure on 15-27B is expected to be 3370 psi at 8700' TVDSS (7.45 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2500 psi. • A min EMW of 8.4 ppg for this well will provide 430 psi over -balance to the reservoir. Josi Hartley CC: Well File CTD Engineer Joseph Lastufka 564-4570 TREE= CMN WELLHEAD = FMC ACTUATOR= BAKER KB. B -EV = 67' BF. 3EV = ? KOP= 3810' Max Angle = 96'@ 12521' Datum MD= NA Datum ND= saw SS. 20• CORD, 91.5 #, H-40, D= 19.124' 13-318' CSG, 688, K-55 XO TO L-80 13-3/8• CSG. 68#,L-80, D= 12.415- Minimum ID = 3.725" @ 11266' 4-112" HES XN NIPPLE 479. L-80, D = 8.681" 15-27A SAP. NOTES: WELL ANGLE > 70' @ 12177'. "'4-12" CHROME TBe**ORIG WELL NOT SHOWN BELOW WHPSTOCK"' 13C R-85 VAM TOP, .0152 6pf, D = T LW 4422• .0383 = 3.813• GAS LFT MANDRAS ST PEFFORATION SM ARY TVD I DEV Rff LOG: MAO on 05/16/10 VLV LATCH ANGLEAT TOP PEW. 33-@ 11467 DATE Note: Refer to RadueOon OB for Istorieaf perf data SIZE SPF INTERVAL Opn/Sgz DATE 2-12' 6 11462-11472 O 0210SM8 2-112' 6 11484 - 11494 O 06117118 2-7/8' 6 12500-129W C 05/16110 2-7/8' 6 13620- 14180 C 05/16110 2-71W 6 14360- 14720 C 05116110 13C R-85 VAM TOP, .0152 6pf, D = T LW 4422• .0383 = 3.813• GAS LFT MANDRAS ST MD TVD I DEV I TYPE I VLV LATCH PORT DATE 3 3549 3548 1 MAG DOME RK 16 0523110 2 7778 6126 64 KBG2 SO BK 20 0523110 1 11096 7902 34 KBG2 DMY SK 0 05/18110 365V I9-5/8' X 7' BKR ZXP LTP w /11RACK SLt ID=6.19' 3673' 9-5/9' X 7' BKR FLIXLOCK LNR HGl7, D = 6.180' MLLOUT VNPDOW(15-27A) 3810'-3827- Nll' Eb.i PBTD H 14773- DATE REV BY COMMENTS DATE I REV BY COMMENTS 02!15192 ORIGINAL COMPLETIONADFERFS (06117118) 0 ES SIDETRACK(15-27A) 05119NN� RIC C DRLG HO OORRECTIONS 0525/10 WECJPJC GLV 00 (05123110) 7 08!09110 HIJHD DR -G DRAFT COFffCTIDNS 0012118 BTWJMD SET ISO PLUG 8 ADPERFS r X 4-1/2" FES TNT PKF 471x-- HES X NP. D= 12' FES XN NP, D - 3.725- T X 5' ZXPN HRD-E LTPw /TEBACK SLV. D = 4.20' 11_2W I 7- X 5- BKR FLEXLOCK HGF , ID= 4.220• 11287-1 5- X 4-12' XO, D = 31 ISO PLM (02/05118) 11 PRUDHOE BAY tlr1T WELL: 15-27A PEFW No: 2100230 AR No: 50-029-22243-01-00 SEC 22, TIM RME 324' FPL 8 58' FWL BP Bcploration (Alaska) TREE= WELHEAD= FMC ACTUATOR= DEVI 103. ELE/ = 6T BF. E_EV = ? KOP= 3810' Max Angle = _° @ ' Datum MID ' Datum TVD= 8800'SS PROPOSE REV 2 20' COPD, 110' 91.5 #, H-40, D = 19.124" 13-3/8" CSG, 68#, K-55 XO TO L-80 113' 13-3/8" CSG, 68#,L-80, D =12.415" 3510' Minimum ID =3.725"@ 11266' 4-1/2" HES XN NIPPLE V=&681, .0152 bpf, D = 3.958" j45KB LTP �-j 11300' TOP OF LNR 1131W SAFE TOTES: WELL ANGLE > 70" @ _'. 15-27P MAX DLS:_* @ '. **`4-1/2" CHROME TBG& LNR`*` 41/2' LNR 12.6#, L-80 MT -M, —14400' i' .0152 bpf, D=3.958" 2-7/8" LNR, 6.5#,13CR-80, _bpf, ID=_" — 15175' 2-3/8" X 3. OH PACKERS, ID = NO DEPTH 10 9 8 7 6 5 4 3 2 1 2-3/8" LNR,_#, 13CR80, ._ bpf, D = — 16510' GASLFTMANDRELS ISTI MD I TVDj DEVI TYPEI VLV ILATCHI PORT DATE 3 3549 3548 1 MNG MG DOME RK 16 05/23/10 2 7778 6126 64 K SO BK 20 05/23/10 1 11096 7902 34 KBG2 fJA4Y BK 0 05/18/10 3656' H9-5/8"X7"BKR ZXP LTPw/FLIX-LOCK TACK SLEEVE, D = 6.180" 3673' 9-5/8" X 7" BKR FLEXLOCK LNR HGR D=6.180' MLLOIJT WN)OW(15-27A) 3810'-382T jV 4-1/2"HES X NP, D=3.813' 11165' -17"X4-1 /2" HES TNT PKR, D = 3.856" 11196' 4-1/2" HES X NP, D = 3.813" 11266' 4-1/2" HES XN NP. D = 3.725' I7" X " ZXPN 0. HRE LTPw /BKR FLEX -LOCK HGRB TEBP,CK SLV, D=4.20" 41/2" WLEG. D = 3 9SW -1 11310' H3.70' DEPLOY SLV, ID=3.00" 3-1/2" _ X NIP, ID = 2.813" 14390' 3-1/2" X 2-7/8" XO, D = _" MILLOUT WINDOW (15-27B) 14400'- 5175- 2-7/8" z 2-3/8" XO, ID = " 2-38"AICD JOINT. ID= " NO DEPTH NO. AICD 10 02/15/92 9 05119/10 8 SIDETRACK(15-27A) 7 CTD ST (15-2713) 6 12/17/18 JND 5 01/15/19 4 BULT PROPOSED REV 1 3 2 1 DATE FEV BY COMM34TS DATE REV BY COMMENTS 02/15/92 CRIGINALCOMPLETION 05119/10 WlS SIDETRACK(15-27A) CTD ST (15-2713) 12/17/18 JND BULT PFnPOSED 01/15/19 ZB/JMD BULT PROPOSED REV 1 PRUDHOE BAY LUT WB -L: 15-276 PEFUT No: API No: 50-029-22243-01-01 . T11 N R14E 324' FNL & 58' FWL North America - ALASKA - BP PBU 15 15-27 PLAN 15-27B OrIiM61 W-14T11OM BP Coil Tubing Report 22 March, 2019 R e Company: North America - ALASKA - BP Project: PBU Site: 15 Well: 15-27 Wellbore: PLAN 15-27B Design: 15-27B WP05 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones , Geo Datum: NAD27' OGP-Usa AK [4267.15864] Map Zone: NAD27 ° OGP-Usa AK / Alaska zone 4 [26734.1586, Site 15, TR -11-14 5,958,837.360 usft Site Position: Easting: From: Map Well 15.27 Position Uncertainty: 0.00 usft Mean Sea Level Well 15-27,15-27 RT @ 60.35usft (15-27A) Well Position °N/ -S 0.00 Left N Latitude: .E/ -W 0.00 usft E Position Uncertainty 0.00 usft EDM R5K - Alaska PROD - ANCP7 Wellbore PLAN 15-27B Mean Sea Level Magnetics Model Name Sample Date Decl Dip Angle Field Strength BGGM2018 7/1/2019 Using geodetic scale factor Design 15-27B WP05 Audit Notes: 16.82 Version: Phase: PLAN Vertical Section: Depth From (TVD) -NI-S husk) (usft) Direction -33.99 0.00 BP 5,958,837.360 usft BP Coil Tubing Report Easting: Local Coordinate Reference: Well 15.27 TVD Reference. Mean Sea Level 0.000 in MD Reference: RT @ 60.35usft (15-27A) North Reference: True Latitude: Survey Calculation Method: Minimum Curvature 675,967.790 usft Database: EDM R5K - Alaska PROD - ANCP7 Elevation: System Datum: Mean Sea Level Ground Level: ination Using Well Reference Point Dip Angle Field Strength Using geodetic scale factor Northing: Wellhead 5,958,837.360 usft Latitude: Easting: 676,296.980 usft Longitude: Slot Radius: 0.000 in Grid Convergence: orthing: 5,961,157.180 usft • Latitude: asting: 675,967.790 usft Longitude: Elevation: 33.99 usft Ground Level: ination Dip Angle Field Strength (nT) 16.82 80.93 57.419 Tie On Depth: 14,371 90 +EI -W Direction (usft) (°) 0 00 340 A0 70° 17'35.236 N 148'34'21.213W 1.34 ° 70° 17'58.123 N 148' 34'29.222 W 32.20 usft 322/2019 2:17,09AM Page 2 COMPASS 5000.1 Build BIO BP BP Coil Tubing Report Company: North America - ALASKA - BP Northing Easting Project: PBU DLeg V. Sec Site: 15 (usft) (usft) (usft) Well: 15-27 (°1100usft) (usft) Wellbore: PLAN 15-278 5,969,234.272 676,676.306 Design: 15-276 WP05 0.00 7,265.83 Survey Tool Program Date 3/22/2019 882.79 5,969,257.765 From To 1.73 7,293.28 (usft) (usft) Survey (Wellbore) 872.11 Tool Name 431.35 3,440.35 15-27 Srvy 1 MWD (15-27) 9.00 MWD 3,705.00 4,213.00 15-27APB1 Srvy 1 GYD GC SS (15-27AP GYD-GC-SS 4,307.01 11,405.17 15-27APB1 Srvy 2 MWD+IFR+MS (15-27A MWD+IFR+MS-WOCA 11,445.70 11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS (15-27A MWD+IFR+MS-WOCA 11,926.82 14,371.90 15-27A Srvy 1 MWD+IFR+MS (15-27A) MWD+IFR+MS-WOCA 14,371.90 16,536.00 15-27B WP05 (PLAN 15-27B) MWD Planned Survey 5,989,386.332 676,551.914 MD Inc Azi TVDSS NIS (usft) 1°1 (I (usft) (usft) 14,371.90 85SA 328.34 8,654.48 8,058.81 TIP 5,969,457.520 676,443.848 14,400.00 86.31 328.22 8,656.40 8,082.65 KOP 5,969,490.942 676,349.855 14,420.00 84.93 327.06 8,657.93 8,099.50 Start DLS 12.00 TFO -140.00 5,969,502.323 676,280.888 14,460.00 81.26 323.94 8,662.73 8,132.22 Start DLS 12.00 TFO 50.00 478.80 5,969,505.962 14,500.00 83.69 319.76 8,667.97 8,153.39 14,570.11 88,00 312.52 8,673.06 8,213.75 Start DLS 12.00 TFO -90.00 12.00 14,600.00 88.00 308.93 8,674.10 8,233.23 14,700.00 88.07 296.92 8,677.54 8,287.45 14,800.00 88.23 284.91 8,680.78 8,323.07 14,870.00 88.38 276.51 8,682.85 8,336.06 Start DLS 12.00 TFO 89.00 14,900.00 88.45 280.11 8,683.66 8,340.40 15,000.00 88.71 292.11 8,686.17 8,368.09 15,100.00 89.03 304.11 8,688.15 8,415.12 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description MWD - Standard Gyrodata gyro single shots MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD+ IFIR +Multi Station W/O Crustal MWD - Standard Well 15-27 Mean Sea Level RT Q 60.35usft (15-27A) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 EIW Northing Easting DLeg V. Sec TFace (usft) (usft) (usft) (°1100usft) (usft) (') 897.53 5,969,234.272 676,676.306 0.00 7,265.83 0.00 882.79 5,969,257.765 676,661.013 1.73 7,293.28 -14.29 872.11 5,969,274.354 676,649.949 9.00 7,312.76 -140.00 849.63 5,969,306.535 676,626.708 12.00 7,351.19 -140.00 825.14 5,969,337.123 676,601494 1200. 7,388.86 50.00 776.72 5,989,386.332 676,551.914 12.00 7,452.74 .5945 754.08 5,969,405.281 - 676,528.827 12.00 7,478.80 -90.00 670.34 5,969,457.520 676,443.848 12.00 7,558.39 -89.87 577.15 5,969,490.942 676,349.855 12.00 7,623.73 -8946 508.47 5,969,502.323 676,280.888 12.00 7,659.43 -89.07 478.80 5,969,505.962 676,251.125 12.00 7,673.65 89.00 382.93 5,969,531.403 676,154.643 12.00 7,732.47 88.90 294.91 5,969,576.351 676,065.548 1200. 7,806.76 88.60 31222019 2: 17:09AM Page 3 COMPASS 5000.1 Build 81D 3222019 2:17:09AM Page 4 COMPASS 5000.1 Build 810 BP by BP Coil Tubing Report Company: North America -ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: Mean Sea Level Site: 15 MD Reference: RT (a3 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: PLAN 15-27B Survey Calculation Method: Minimum Curvature Design: 15-27B WP05 Database: EDM R5K - Alaska PROD - ANCPI Planned Survey MD Inc Azi TVDSS NIS ENV Northing Easgng OLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (MR) ('I100usft) (usft) (') 15,150.00 89.21 310.11 8,688.92 8,445.27 255.06 5,969,605.557 676,025.008 12.00 7,848.72 88.36 Start OLS 12.00 TFO .90.60 15,200.00 89.16 304.11 8,689.64 8,475.42 215.20 5,969,834.765 675,984.461 12.00 7,890.68 -90.50 15,300.00 89.09 292.11 8,691.17 8,522.44 127.17 5,969,679.710 675,895.355 12.00 7,964.98 -90.41 15,350.00 89.07 286.11 8,691.98 8,538.80 79.96 5,969,694.955 675,847.773 12.00 7,996.50 -90.23 Start DLS 12.00 TFO 88.60 15,400.00 89.23 292.11 8,692.72 8,555.16 32.73 5,969,710.202 675,800.185 12.00 8,028.02 88.50 15,500.00 89.58 304.10 8,693.76 8,602.17 -55.31 5,969,755.143 675,711.070 12.00 8,102.32 88.41 15,600.00 89.95 316.10 8,694.17 8,666.47 -131.66 5,969,817.626 675,633.238 12.00 8,188.85 88.29 15,700.00 90.31 328.09 8,693.95 8,745.22 -192.99 5,969,894.920 675,570.089 12.00 8,283.83 88.24 15,800.00 90.67 340.09 8,693.09 8,835.00 -236.61 5,969,983.648 675,524.384 12.00 8,383.11 88.261 15,900.00 90.99 352.08 8,691.64 8,931.88 -260.61 5,970,079.930 675,498.120 12.00 8,482.36 88.3711 16,000.00 91.27 4.08 8,689,65 9,031.62 -263.95 5,970,179.560 675,492.445 12.00 8,577.22 88.54 j 16,050.00 91.39 10.08 8,688.49 9,081.20 -257.79 5,970,229.267 675,497.442 12.00 8,621.71 88.781 Start DLS 12.00 TFO 86.00 16,100.00 91.80 4.09 8,687.09 9,130.78 -251.63 5,970,278.973 675,502.443 12.00 8,666.19 -86.00 , 16,200.00 92.56 352.11 8,683.27 9,230.47 -254.93 5,970,378.551 675,496.807 12.00 8,761.00 -86.17 16,300.00 93.21 340.11 8,678.22 9,327.24 -278.86 5,970,474.733 675,470.620 12.00 8,860.12 -86.63 16,330.00 93.37 336.51 8,676.49 9,355.07 -289.92 5,970,502.287 675,458.905 12.00 8,890.05 -87.23 Start DLS 12.00 TFO 92.00 16,400.00 93.05 344.92 8,672.57 9,420.98 -312.99 5,970,567.635 675,434.305 12.00 8,959.87 9200 16,500.00 92.47 356.92 8,667.74 9,519.43 -328.73 5,970,665.684 675,416.266 12.00 9,057.77 92.471 16,536.00 92.23 1.23 8,666.27 9,555.38 -329.31 5,970,701.612 675,414.843 12.00 9,091.75 93.05 TO at 16536.00 3222019 2:17:09AM Page 4 COMPASS 5000.1 Build 810 BP by BP Coil Tubing Report Company: North America - ALASKA - BP Local C"rdlnate Reference: Well 15-27 Project: PBU TVD Reference: Mean Sea Level Site: 15 MD Reference: RT @ 60.35usft (15-27A) Well: 15-27 North Reference: True Wellbore: PLAN 15-278 Survey Calculation Method: Minimum Curvature Design: 15-27B WP05 Database: EDM R5K - Alaska PROD - ANCP7 Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 15-27B Polygon 0.00 0.00 0.00 9,237.57 -1,093.85 5,970,366.000 674,658.000 70° 19'28.973 N 148° 35' 1.149 W - plan misses target center by 8705.73usft at 16536.00usft MD (8666.27 TVD, 9555.38 N. -329.31 E) - Polygon Point 1 0.00 0.00 0.00 5,970,366.00 674,658.00 Point 0.00 696.54 499.48 5,971,074.00 675,141.00 Point 0.00 657.23 981.72 5,971,046.00 675,624.00 Point 0.00 255.66 1,000.33 5,970,645.00 675,652.00 Points O.DO -74.29 1,121.64 5,970,318.00 675,781.00 Point 0.00 -571.35 1,416.10 5,969,828.00 676,087.00 Point 0.00 -833.91 1,307.92 5,969,563.00 675,985.00 Point 0.00 -1,135.74 1,381.87 5,969,263.00 676,066.00 Point 0.00 -1,213.21 631.81 5,969,168.00 675,318.00 Point 10 0.00 -142.71 241.74 5,970,229.00 674,903.00 Point 11 0.00 0.00 0.00 5,970,366.00 674,658.00 15-27B Fault 4 0.00 0.00 0.00 10,469.75 -955.95 5,971,601.000 674,767.000 70° 19'41.092 N 148' 34'57.128 W - plan misses target center by 8736.87usft at 16536.00usft MD (8666.27 TVD, 9555.38 N. -329.31 E) Polygon Point 1 0.00 0.00 0.00 5,971,601.00 674,767.00 Point 0.00 -431.01 -646.31 5,971,155.00 674,131.00 Point 0.00 -974.63 -1,268.25 5,970,597.00 673,522.00 Point 0.00 -431.01 -646.31 5,971,155.00 674,131.00 15-27B T1 0.00 0.00 8,694.00 8,787.06 -182.09 5,969,937.000 675,580.000 70' 19'24.543 N 148° 34'34,536 W - plan misses target center by 30.39usft at 15732.93usft MD (8693.73 TVD, 8773.76 N, -209.42 E) - Point 15-27B Fault 1 0.00 0.00 0.00 8,804.86 339.50 5,969,967.000 676,101.000 70' 19'24.718 N 148'34'19.313 W - plan misses target center by 8696.70usft at 15175.32usft MD (8689.28 TVD, 8461.06 N, 235.27 E) -Polygon Point 1 0.00 0.00 0.00 5,969,967.00 676,101.00 Point 0.00 -662.36 432.64 5,969,315.00 876,549.00 Point 0.00 -1,250.73 738.96 5,968,734.00 676,869.00 Point 0.00 -662.36 432.64 5,969,315.00 676,549.00 15-27B Fault 5 0.00 0.00 0.00 7,618.34 -1,491.90 5,968,738.000 674,298.000 70° 19' 13.047 N 148° 35' 12.758 W - Plan misses target center by 8861 74usft at 15628 48usft MD (8694.17 TVD 8687.55 N -150.77 E) 3222019 2:17:09AM Page 5 COMPASS 5000.1 Build 810 BP BP Coil Tubing Report Company: North Amedce- ALASKA - BP 5,968,738.00 500.77 Project: PBU 964.81 5,969,080.00 Site: 15 5,968,946.00 Well: 15-27 Wellbore: PLAN 15-27B Design: 15-278 WP05 - Polygon Point 1 0.00 0.00 Point 2 0.00 198.34 Point 3 0.00 319.52 Point 4 0.00 196.34 15-27B Fault 2 0.00 0.00 0.00 7,201.62 - plan misses target center by 8744.58usft at 14371.90usft MD (6654.48 TVD, 8058.81 N, 897.53 E) - Polygon Point 1 0.00 0.00 Point 2 0.00 275.35 Point 3 0.00 620.62 Point 0.00 275.35 15-27B T2 0.00 0.00 8,666.00 9,556.65 - plan misses target center by 5.35usft at 16536.00usft MD (8666.27 TVD, 9555.38 N, -329.31 E) Point 15-27B Fault 3 0.00 0.00 0.00 8,174.60 - plan misses target center by 8821.97usft at 14371.90usft MD (8654.48 TVD, 8058.81 N, 897.53 E) Polygon Point 1 0.00 0.00 Point 2 0.00 1,743.60 Casing Points Measured Depth (usft) 16,536.00 Vertical Depth (usft) 8,666.27 27/8" Name Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: 0.00 5,968,738.00 500.77 5,968,946.00 964.81 5,969,080.00 500.77 5,968,946.00 -15.18 5,968,356.000 0.00 5,968,356.00 1,440.94 5,968,665.00 3,142.60 5,969,050.00 1,440.94 5,968,665.00 -324.12 5,970,703.000 2,604.51 5,969,390.000 0.00 5,969,390.00 -1,708.75 5,971,093.00 Casing Hole Diameter Diameter (in) (in) 2.875 4.250 Well 15-27 Mean Sea Level RT @ 60.35usft (15-27A) True Minimum Curvature EDM R5K - Alaska PROD - ANCP7 674,298.00 674,794.00 675,255.00 674,794.00 675,784.000 675,784.00 677,218.00 678,911.00 677,218.00 675,420.000 678,380.000 678,380.00 676,631.00 70" 19'8.950 N 148" 34'29.664 W 70° 19'32.112 N 148' 34'38.682 W 70'19'18.515N 148°33'13.212W 3222019 2:17:09AM Page 6 COMPASS 5000.1 Build 81D F ee Company: Project: Site: Well: Wellbore: Design: Formations Plan Annotations North America - ALASKA - BP PBU 15 15-27 PLAN 15-27B 15-27B VVP05 Measured Depth (usft) 11,576.89 12,010.30 11,857.82 11,874.29 11,986.62 12,177.64 12,142.60 12,254.22 Measured Depth (usft) 14,371.90 14 400.00 14,420.00 14,460.00 14,570.11 14,870.00 15,150.00 15,350.00 16,050.00 16,330.00 16,536.00 BP BP Coil Tubing Report Vertical Depth (usft) Name Lithology 8,244.00 TSAD 8,567.00 22P 8,470.00 26N 8,481.00 26P 8,552.00 22N 8,644.00 PGOC 8,632.00 7000 8,685.00 TDF Vertical Local Coordinates Depth +N/ -S +El -W (usft) (usft) (usft) Comment 8,654.48 8,058.81 897.53 TIP 8,656.40 8,082.65 882.79 KOP 8,657.93 8,099.50 872.11 Start DLS 12.00TFO-140.00 8,662.73 8,132.22 849.63 Start DLS 12.00 TFO-60.00 8,673.06 8,213.75 776.72 Start DLS 12.00 TFO -90.00 8,682.85 8,336.06 508.47 Start DLS 12.00 TFO 89.00 8,688.92 8,445.27 255.06 Start DLS 12.00 TFO -90.50 8,691.98 8,538.80 79.96 Start DLS 12.00 TFO 88.50 8,688.49 9,081.20 -257.79 Start DLS 12.00 TFO -86.00 8,676.49 9,355.07 -289.92 Start OLS 12.00 TFO 92.00 8,666.27 9,555.38 -329.31 TO at 16536.00 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Dip Dip Direction Well 15.27 Mean Sea Level RT @ 60.35usft (15-27A) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Checked By: Approved By: Date: I 3/222019 2: 17:09AM Page 7 COMPASS 5000.1 Build 81D North America - ALASKA - BP PBU 15 15-27 PLAN 15-27B 15-27B WP05 Anticollision Summary Report 22 March, 2019 Company: North Amedw- ALASKA -BP Project: PBU Reference Site: 15 Site Error: O.00usft Reference Well: 15-27 Well Error: O.00usft Reference Wellbore PLAN 15-278 Reference Design: 15-27B WP05 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-27 Mean Sea Level RT @ 60.35usft (15-27A) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 15-27B WP05 MWD Filter type: NO GLOBAL FILTER'. Using user defined selection 8 filtering criteria WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 14,371.90 to 16,536.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,850.96usft Error Surface: Elliptical Conic Survey Tool Program Date 3/22/2019 From To (usft) lush) Survey(Wellbom) Tool Name Description 431.35 3,440.35 15-27 Srvy 1 MWD (15-27) MWD MWD- Standard 3,705.00 4,213.00 15-27AP61 Srvy 1 GYD GC SS (15-27AP GYD-GC-SS Gyrodata gyro single shots 4,307.01 11,405.1715-27AP81 Srvy 2 MWD+IFR+MS (1 5-27A MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 11,445.70 11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS (15-27A MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 11,926.82 14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 14,371.90 16,536.00 15-27B WP05 (PLAN 15-27B) MWD MWD - Standard 322/2019 12:46.23AM Page 2 of 4 COMPASS 5000.1 Build 81D BP by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-27 Project: PBU TVD Reference: Mean Sea Level Reference Site: 15 MD Reference: RT @ 60.35usft (15-27A) Site Error: O.00usft North Reference: True Reference Well: 15-27 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore PLAN 15-27B Database: EDM R5K-Alaska PROD -ANCP7 Reference Design: 15-27B WPO5 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) 15 15-05 - 15-05 - 15-05 Out of range 15-05 - 15-05A - 15-05A Out of range 15-05 - 15-05APB1 - 15-05APB1 Out of range 15-05 - 15 -OSB - 15-05B Out of range 15-05 - 15-05BPBI - 15-OSBPBI Out of range 15-18 - 15-18 - 15-16 Out of range 15-18 - 15-18A- 15-18A Out of range 15-21 - 15-21 - 15-21 Out of range 15-21 - 15-21 A - 15-21A Out of range 15-22 - 15-22 - 15-22 Out of range 15 -27 -15 -27A -15-27A 14,671.90 14,700.00 80.16 1.50 80.16 Pass-NOERRORS 15-28-15-28B-15-288 14,996.90 12,125.00 1,643.50 176.84 1,476.11 Pass - Major Risk 15-28 - 15-28BPB1 - 15-28BPB7 Out of range 15-28 - 15-28BPB2 - 15-28BPB2 14,996.90 12,100.00 1,663.35 177.20 1,498.16 Pass -Major Risk 15-29 - 15-29 - 15-29 15,821.90 12,950.00 988.98 351.27 637.52 Pass - Major Risk 15-29 - 15-29A- 15-29A 14,921.90 12,675.00 790.12 175.03 628.23 Pass - Major Risk 15-29 - 15-29APB1 - 15-29APB1 15,021.90 12,356.00 981.42 198.68 792.11 Pass- Major Risk 15 -29 -15 -29B -15-29B 16,536.00 14,250.00 1,169.04 333.61 834.50 Pass - Major Risk 15-29 - 15-29BPB1 - 15-29BPB1 Out of range 15-33 - 15-33 - 15-33 Out of range 15-33 - 15-33A- 15.33A Out of range 15-33 - 15-33B - 15-33B Out of range 15-33 - 15-33C - 15-33C Out of range 15-33 - 15-33PB1 - 15-33PBI Out of range 15-33 - 15-33PB2 - 15-33PB2 Out of range 15-45 - 15-45 - 15-45 Out of range 1545 - 15-45A- 1545A Out of range 15-45 - 15-45APB1 - 1545APB1 Out of range 1545 - 15-45AP82 - 1545APB2 Out of range 1545 - 1545C - 1545C Out of range 15-45 - 1545CPB1 - 1545CPB1 Out of range 1546 - 1546 - 1546 Out of range 15-46 - 154611 - 15461-1 Out of range 1546-154611 PB1-15461.1 PB7 Out of range K K-10 - K-1 OC - K-1 OC Out of range K-1 0 - K-1 OD - K-1 OD 16,307.47 14,475.00 714.39 299.87 419.30 Pass -Major Risk 312212019 12:46:23AM Page 3 of COMPASS 50001 Build 81D as Company: North America- ALASKA - BP Project: PBU Reference Site: 15 Site Error: 0 0ousft Reference Well: 15-27 Well Error: 0.o0usft Reference Wellbore PLAN 15-27B Reference Design: 15-278 WP05 BP Anticollision Report Local Co-ordinate Reference: Well 15-27 TVD Reference: Mean Sea Level MD Reference: RT @ 60.35usft (15-27A) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP7 Offset TVD Reference: Offset Datum Reference Depths are relative to RT @ 60.35usft (15-27A) Coordinates are relative to: 15-27 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.34° 1800- ,1350- 0 800- ,1350- O TU n Ulu 900- (2 c d U 0 C w 450- 0 0 Q$ K-10, K -10D, VO -8- 1505,1505B,15-05BVO Ladder Plot 15-05,1505APB1, 15-05APB1 V2 -� 154D5,1505BPB1, 1505BPB1 VO 1505,1505A., 15405AV2 43- 1516,15168, 15-16BVO $ 1516,1516CPB2,1516CPB2VO $ 15-16,1516BPB1, 1516BPB1 VO --)F 1516,15-16C, 15-16C VO -Ar 1516,1516A, 15-16A V3 -1t- 1516,1516,1516V5 $ 1516,1516CPB1, 1516CPB1 VO � i�1, 1a 1, 10- I v i T Isaa, IS3Jl., ictoo,-w I 60& 1541,1541AMVIAV2 12WO 1533,1533P9§,Q@3PB2 V1 18000 $iI�QW, '61$4f�BID,ttS( W n}� 15-03,1543,1543V1 -Ar 15-05,15-006WB1, 150aAM1 V2 -I- 1506,15064, 15-06A V4 $ 15-06,15-06,15-0BV1 $ 15-17,15-17,15-17V4 15-18,1518A, 15-18A V4 - 1518,1518,1518V1 -� 15-21,1521A, 15-21AV7 ♦- 1521,15-21,1521 V6 $ 1522,1522,15-222 V1 $ 1527,15-27A, 1S-VAVO $ 1546,154611PB1, 15461-1 PB1 V1 $ 15-06,154611,154611 W $ 1549,1549A,1549A V5 -)E- 1549,1549APB1, 1549APB1 V2 -I- 1549,1549PB1, 15.49PB1 V1 -I- 1549,1549C, 15-49CVO $ 15-49,15-49,15-49\/2 $ 1549,15496,15496 VO $ 1519,1519,1519\12 -X- 1519,1519A, 1519AV2 3222019 12:46:23AM Page 4 of 4 COMPASS 5000 1 Build 81D 1 1 I I I I I I 1 I I I I I i I I I I I I I 1 I 1 1 I 1 I I I 1 1 1 I I I I 1 I I _1 I I I I I I I I I 1 � I I 1 I I I I I I I 1 I I I I K-10,K-10C,K K-10,K-10DPB 1 I I GCVO ,K-10DPB1V0 +3- I :LEGEND I 1545,1545BP 1545,1545AP I I I ,1545BPB1 V3 ,15-05APB1V3 I I I I I 1533,'1533B, 5-33BV2 15-33,(1533A, 533AV2 15-05,1505APB1, 15-05APB1 V2 -� 154D5,1505BPB1, 1505BPB1 VO 1505,1505A., 15405AV2 43- 1516,15168, 15-16BVO $ 1516,1516CPB2,1516CPB2VO $ 15-16,1516BPB1, 1516BPB1 VO --)F 1516,15-16C, 15-16C VO -Ar 1516,1516A, 15-16A V3 -1t- 1516,1516,1516V5 $ 1516,1516CPB1, 1516CPB1 VO � i�1, 1a 1, 10- I v i T Isaa, IS3Jl., ictoo,-w I 60& 1541,1541AMVIAV2 12WO 1533,1533P9§,Q@3PB2 V1 18000 $iI�QW, '61$4f�BID,ttS( W n}� 15-03,1543,1543V1 -Ar 15-05,15-006WB1, 150aAM1 V2 -I- 1506,15064, 15-06A V4 $ 15-06,15-06,15-0BV1 $ 15-17,15-17,15-17V4 15-18,1518A, 15-18A V4 - 1518,1518,1518V1 -� 15-21,1521A, 15-21AV7 ♦- 1521,15-21,1521 V6 $ 1522,1522,15-222 V1 $ 1527,15-27A, 1S-VAVO $ 1546,154611PB1, 15461-1 PB1 V1 $ 15-06,154611,154611 W $ 1549,1549A,1549A V5 -)E- 1549,1549APB1, 1549APB1 V2 -I- 1549,1549PB1, 15.49PB1 V1 -I- 1549,1549C, 15-49CVO $ 15-49,15-49,15-49\/2 $ 1549,15496,15496 VO $ 1519,1519,1519\12 -X- 1519,1519A, 1519AV2 3222019 12:46:23AM Page 4 of 4 COMPASS 5000 1 Build 81D am A'p10G; WELL DETAILS: 1527 WELLBORE DETAILS: PIAN 15.Z78 REFERR INFOFWTJON pm WTm Nm6 Mepnm fBB Site: 76 GmI 32.20 Inc CoVeira(TVD): WMn S27Tma N9M da Fia. Wap: 7627 Norbinl: Nastin9: 5961157.100 PererHieonMe: 16271 VSe*n VDI: MaaaOea Level s�reMqAne 819 WNbeFx PIAN 16278 9:875007581 Tie an MD: 14371.90 Se49n NSC Sbt.(6G.M O. DqAqIe Daaipn: 1621BWPofi attitu Lapitu0e: 70° 1 '29. N LOngiWOe: 140'34'29.222 W 2 1440040 Mmwmtl Oew MT ..351a8(15 T/A) 16 CekUgun MNkd', Mii.remCuvgum I GIM, Mo4eI:pGGM201 saW sane 69aE Bsz9 8560 SON SECTIONOETAILS ANNOTATIONS Sac MD Inc Azi nTVD 4WS 4EFW DIeg TFwe VSW Ta" TVD MD Anna n 1 14371.90 85.84 328.34 8654.48 8068.81 89253 0.00 0.00 7265.83 8654.48 14371.90 TIP 2 1440040 86.31 328.22 0656.40 808265 86279 173 -1429 729328 865640 1440000 KOP 3 14420.2 64.93 327.06 8657.93 8099.50 872.11 9.00 -14040 731276 865793 1442000 Stan DIS 12.ODTFO-140.00 4 1446040 81.26 323.94 8662.73 813222 84963 1200 -14000 7351.19 866273 14460.00 Stmt OLS 12.00TF040.00 11457011 88.00 312.52 8673.06 8213.75 776.72 12.00 E00D 7452.74 867306 14570.11 Start OLS 12.00TFO-90.00 6 74870.00 88.38 276.51 868285 833606 508.47 1200 .90.00 765943 868205 14070.06 Stat DLS12.007089.00 7 1515000 89.21 310.11 868092 8W5.27 25606 1200 89.06 784872 868B92 15150.00 Siert OLS 12.00 TFO-90.50 6 1535000 89.07 286.11 869148 9538.80 7996 12.00 -9050 799650 8691.98 15350.00 Start OLS 1200TFO88..50 91065000 9739 10.08 868B49 9081.20 -257.79 1210 88.50 8621.71 868&49 16050.00 Sten OLS 12.00TF0�86.00 10 76330.00 9337 336.51 867649 935607 -289.92 1200 8600 8890.05 867649 16330.00 Sten DLS 12.00TFO92.W 11 1653640 92.23 1.23 866627 9555.38 32931 1200 92.00 9091.75 866627 76536.00 1Dg 16536.06 saW sane 69aE Bsz9 8560 SON -1900 -1200 -1000 -800 -600 dW -200 0 200 000 -W- 800 1000 1200 1400 1600 1800 2000 22W West( -)/East(+) (200 usft/in) III■■■`�CJiT:IRVP_ti�■■■■■■■ 1-7 5 I\■■\\ ■_■■■■■ \■ I■\■■���■`r WIMM■■■■■■ ■\\■■S .: , iiWNL US. MEN ■■■��_ww ism MEN ■■1_��i■■■�\,�i�■ ■■■■ -1900 -1200 -1000 -800 -600 dW -200 0 200 000 -W- 800 1000 1200 1400 1600 1800 2000 22W West( -)/East(+) (200 usft/in) 55W 5600 5706 5800 5900 6060 6106 6206 6306 WW 6506 6600 6706 68W 6900 7000 7106 7206 7300 7906 75W 7600 "M 7800 7900 8006 8106 6206 8306 9406 8506 8600 8700 8806 8900 9006 91W 9206 9300 9906 Vertical Section at 340.00° (100 usft/in) 1-7 5 5-279 I OP 1S21 3TI tMD SI2 TFO- 000 S DLsI OD 89 .D S12 TFO- W M165 00 DL 12W FO 6 W DLS I W TF `903 Sten LSI WTF 88.50 Lev 55W 5600 5706 5800 5900 6060 6106 6206 6306 WW 6506 6600 6706 68W 6900 7000 7106 7206 7300 7906 75W 7600 "M 7800 7900 8006 8106 6206 8306 9406 8506 8600 8700 8806 8900 9006 91W 9206 9300 9906 Vertical Section at 340.00° (100 usft/in) PMJW: POU Bill 16 ANTFCOLLISM SETTINGS COMMNY DETAILS: Nwm America-ALASI(A-B+ Merponlonmamul. wjfflerval:2500 CNwlaEcnMmoo Min roulcurnbre Well: 16.27 DepM Range Fmm: 1437100 To 16536.00 Ermr Syebm: ISCWSA 3400.35 Raub Lnuad By Centre Dlownce: 185006 San Ma iod Trav CyMOer None IAh6bon: PLAR15.27B Redolence'PWAS-27BWP05(1527/PlAN1S27B) Enor Surtax: 810alConic Plan: 16-27OWP06 W YArnhg MMoO. Runs Bostic! Ladder Plat x116 wt¢, Fittw I'll Il i'll 1 IlsrM SURVEYPROGRM4 Nam Amerke-ALASWI-0o Hruw DepM Tc g Tool 431.35 3400.35 K.10 K.11IIIllll -l0F4ElIW q vN Ii }WgtY 370500 rGµ HmW new 15-27APB1 Billy 1 GYD GC SS(1S27APB1) K-10 K,1M -Will++sq+YYgrsc-BW� W 11405.17 -RKIlli .6eI n 11445.70 +�sb,�u iscvr w�q w�ev saw Haxn M lfflrMS-WOCA 11826.82 14371.80 r Asn Hme�. Hmre�w + ~+JPR•MSiV%MA _ _ 1437100 16536.00 15-27B WP05 (PLMI 16276) a H46sK r>vw +Iso.rsux, e6rvrle � n +Hq �eorem, �sbsm va r +rsna ram r iso Hmet rs >aq fanw n ny 11x6 aaew nw�}s¢w +�saa r.a, oma rsecw +we. H+x.wmw� rna Hee+e�nese+w +na. Asn. saw «sn r>ay.navw +�>a nn. Hnve From Colour To MD 14372 14650 14650 14800 14800 16536 SURVEYPROGRM4 Nam Amerke-ALASWI-0o Depm Fmon DepM Tc SurveyPMn Tool 431.35 3400.35 15-27 Srvy 1 MWD (15-27) MWD 370500 421300 15-27APB1 Billy 1 GYD GC SS(1S27APB1) GYD-Gl 4307.01 11405.17 15-27AP91 Smy 2 AM -IM-MS(16.27APB1) MYrDNFR-MSW9CA 11445.70 1188811 15-27APB1 Sr13' 3 MM-IFR>M(15-27AP01) M lfflrMS-WOCA 11826.82 14371.80 15.27ASrvy 1 MWD•IFR•10S(1537A) ~+JPR•MSiV%MA _ _ 1437100 16536.00 15-27B WP05 (PLMI 16276) MWD am WELL DETAILS: ANTICOLLISION SETTINGS COMPANY DETAILS: NmmA-ALASIU-BP PWjod: PBU Sb9: 16 GmumJ Lnel: 32.20 utnpolB MBMW: MD,YbrvaL25W CalculaOonflemiud Mirlmum Curvature Well: 16-27 Numbing: 5961157.180 Dem Rena From: 1437180 To 16536.00 Rmr Spmm: ISCWSA Wellbore: PLAN16.278 Eeseng: 675967.79➢ RnMb Limial By: Centre➢stance: 1850.96 Sun MBMW: Tree Cylinder NOM Plan: 16-27BWPO6 L8811We70' 1T 58.123 N Reference: 15270 WP05 Error Surface: EIIiPBcalConm Longitude'. 1413' 34.29.222 W Warning MMhod: Ruin BUM Depth Range: 14371.90 To 16536.00 Sl9NVE1MOGRAM Degn From DeuM To SbveM.n Tod 431.35 3440.35 IiV 8rvy 1 MWD (1i27) MM 370500 421300 1S27APBt Srvy 1 GTD GC SS(1S27MB1) M_3G B 43W.01 11405.17 152TN91 SIvy 2 MWD+IM.MB(1537MB1) MWDNFR+MAWCGA 11445.70 1189641 1S27p 1SM3MW +IFR+MS (1S27M81) 81ND+IFR+MS0CCA 119M82 14371.90 159ASrvy 1 MMAM+MS(1S27A) MND+I1FIR+M54MOOA 14371.90 165M 00 15278 WF115(PLAN 15-278) MWD 14371.90 To 16536.00 A2imum from NCM1.1K centre W centre senernon IM Muni ISP, IS0.l 15AeN ISR I1YPe1. 11 ISm.1 ., 1.. V4 19A I19I.W IYR 119191, 11 .1 ISY ISYLIPB+ I14mm"1111¢111¢. ISI. Vt "Int. NAS Iiq ISR 116PNK IW ISP iY 1 W 159159. IS9 VIISR ISYl1, ISY.I N S1M 1YIM V! YD 1 ISR.ISP.SR 1515&91, IS 1yva 1YID. 1326 yS'1111 iMN 159Il1159& Y1R SIIA S1I. 11a .IQ IiSS,SSW9. NV[ 111 SRY ISYA IS�1Y1 eK I�nl 1N 1Y$RA1, 1S]M�N 1 ISPIS11IOIµ11SEBYO 1S11P1. N 1531. 11211 . "..I4lOSAIMK 11 S 151 . IYW IMK I'll. 1,u. ISA SA1ISO R IY V, ".. SYIY ISO3108,R0m1 ➢ Su,1S..11Ie91 11R,SY5W 1,0, ISYI.1YK 11A".. SY 1Y. iY VVI 1SY.1SYaI5�Y 1Sm, ISu. ISU V1 SECTION DETAILS Sec MO Inc ft TVD +WB +EI -W Deg TFeu VSM 1 1437180 M84 320.34 8854.40 8058.81 897.53 O. W 0,00 7265.03 2 144W00 66.31 32822 WMA0 MR 65 602.79 1.73 -14.28 ]2133.20 3 1442000 U93 32].06 %57.93 0099.50 072.11 9.00 -140.M 731276 4 1446000 81.26 32394 W6273 013232 049.63 12,00 -140.00 7351.19 5 14570.11 80.00 312.52 W7386 021375 77812 12.00 BOW 74U 74 6 14870.00 0836 276.51 8588.05 SON 50647 1200. 4 OO 709,43 7 15150.00 0921 310.11 W80.92 844527 255.06 12.00 89.00 784672 0 15350.00 8907 288.11 0691.98 8538.80 79.98 1200 40.50 7886.50 9 1605000 91.39 10,00 8580.49 9061.20 -257,79 12.00 88.50 W2171 1D 1633000 8337 335.51 WIS 49 9355,07 -28992 1200. MDO 889005 Sl9NVE1MOGRAM Degn From DeuM To SbveM.n Tod 431.35 3440.35 IiV 8rvy 1 MWD (1i27) MM 370500 421300 1S27APBt Srvy 1 GTD GC SS(1S27MB1) M_3G B 43W.01 11405.17 152TN91 SIvy 2 MWD+IM.MB(1537MB1) MWDNFR+MAWCGA 11445.70 1189641 1S27p 1SM3MW +IFR+MS (1S27M81) 81ND+IFR+MS0CCA 119M82 14371.90 159ASrvy 1 MMAM+MS(1S27A) MND+I1FIR+M54MOOA 14371.90 165M 00 15278 WF115(PLAN 15-278) MWD 14371.90 To 16536.00 A2imum from NCM1.1K centre W centre senernon IM Muni ISP, IS0.l 15AeN ISR I1YPe1. 11 ISm.1 ., 1.. V4 19A I19I.W IYR 119191, 11 .1 ISY ISYLIPB+ I14mm"1111¢111¢. ISI. Vt "Int. NAS Iiq ISR 116PNK IW ISP iY 1 W 159159. IS9 VIISR ISYl1, ISY.I N S1M 1YIM V! YD 1 ISR.ISP.SR 1515&91, IS 1yva 1YID. 1326 yS'1111 iMN 159Il1159& Y1R SIIA S1I. 11a .IQ IiSS,SSW9. NV[ 111 SRY ISYA IS�1Y1 eK I�nl 1N 1Y$RA1, 1S]M�N 1 ISPIS11IOIµ11SEBYO 1S11P1. N 1531. 11211 . "..I4lOSAIMK 11 S 151 . IYW IMK I'll. 1,u. ISA SA1ISO R IY V, ".. SYIY ISO3108,R0m1 ➢ Su,1S..11Ie91 11R,SY5W 1,0, ISYI.1YK 11A".. SY 1Y. iY VVI 1SY.1SYaI5�Y 1Sm, ISu. ISU V1 L$ AOGCC Spider Plot Easting (200 usfn) WELLBORE DETAILS: P 1S2119 ISfE18CVFCH Tm Sib: 16 xgi.x n coa¢�.e1xElwkex• xxltsn.imwn 15S2113llltfl: 16,27 A 6WmE F 1&m Wsvu15-27Au�u W OM.OWE) Design: l6 IW061%.SO0RMD �,� TW on MD: 14371.90 bifiee� My gey�., MF®evvcu AOGCC Spider Plot Easting (200 usfn) by North America - ALASKA - BP PBU 15 15-27 PLAN 15-27B 15-27B WP05 Plus 500ft MD AOGCC Offset Well Report 22 March, 2019 by Company: North America - ALASKA - BP Project: PBU Reference Site: 15 Site Error: O.00usft Reference Well: 15-27 Well Error: O.00usft Reference Wellbore PLAN 15-27B Reference Design: 15-276 WPO5 Plus 500ft MO BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-27 Mean Sea Level RT Q 60.35usft (15-27A) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference 15-27B WP05 Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center, distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 3/22/2019 From To lush) (usft) Survey (Wellbore) Tool Name Description 431.35 3,440.3515-27 Srvy1 MWO(15-27) MWD MWD - Standard 3,705.00 4,213.00 15-27APB7 Srvy 1 GYD GC SS (15-27AP GYD-GC-SS Gyrodam gyro single shots 4,307.01 11,405.1715-27APB7 Srvy 2 MWD+IFR+MS(15-27A MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal 11,445.70 11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS(15-27A MWD+IFR+MS-WOCA MWD+IFR +Multi Station W/O Crustal 11,926.62 14,371.9015-27A Srvy1 MWD+IFR+MS (1 5-27A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 14,371.90 17,038.0015-27B WPOS Plus 50011 MID (PLAN 15-27 MWD MWD - Standard 3/222019 2.19: 17AM Page 2 of 3 COMPASS 5000.1 Build 81D BP bp Anticollision Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-27 Project: PBU TVD Reference: Mean Sea Level Reference Site: 15 MD Reference: RT @ 60.35usft (15-27A) Site Error: O.00usft North Reference: True Reference Well: 15-27 Survey Calculation Method: Minimum Curvature Well Error: 0 oousft Output errors are at 1.00 sigma Reference Wellbore PLAN 15-278 Database: EDM RSK- Alaska PROD -ANCP7 Reference Design: 15-27B WPOS Plus 500ft MD Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 15 15-17-15-17-15-17 3,874.28 3,950.00 122.41 15-18 - 15-18 - 15-18 2,090.38 2,125.00 163.14 15 -18 -15 -18A -15-16A 2,090.38 2,125.00 163.14 15-19 - 15-19 - 15-19 4,045.68 4,050.00 164.61 15 -19 -15 -19A -15-19A 4,045.68 4,050.00 164.61 15-21 - 15-21 - 15-21 1,365.32 1,375.00 30.22 15 -21 -15 -21A -15-21A 1,347.95 1,350.00 29.92 15-22 - 15-22 - 15-22 392.50 400.00 63.86 15-27 - 15-27 - 15-27 4,118.56 4,125.00 1.60 15-27 - 15-27A- 15-27A 14,672.29 14,700.00 80.16 15-27 - 15-27APB1 - 15-27APB1 12,202.02 12,225.00 64.62 15-27 - PLAN 15.278 - 15-27B 26.36 26.36 0.00 15-27 - PLAN 15-278 - 15-27B WPOS 16,536.00 16,536.00 0.00 15-28 - 15-28 - 15-28 716.74 725.00 121.43 15-28 - 15-28A- 15-28A 715.74 725.00 121.43 15-28 - 15-288 - 15-28B 13,252.91 13,750.00 77.67 15-28 - 15-28BPB1 - 15-28BPB1 716.74 725.00 121.43 15-28 - 15-28BPB2 - 15-28BPB2 716.74 725.00 121.43 15-29 - 15-29 - 15-29 241.91 250.00 181.55 15-29 -15-29A- 15-29A 241.91 250.00 181.55 15.29 - 15-29APB1 - 15-29APB1 241.91 250.00 181.55 15-29 - 15-298 - 15-29B 247.71 250.00 181.70 15-29 - 15-29BPB1 - 15-29BPB1 247.71 250.00 181.70 15-33 - 15-33 - 15-33 2,875.53 2,900.00 124.71 15 -33 -15 -33A -15-33A 2,875.53 2,900.00 124.71 15.33 -15 -33B -15-33B 2,875.53 2,900.00 124.71 15-33 - 15-33C - 15-33C 2,875.53 2,900.00 124.71 15-33 - 15-33PB1 - 15-33PB1 2,875.53 2,900.00 124.71 15-33 - 15-33PB2 - 15-33PB2 2,875.53 2,900.00 124.71 15A4 - 15-44 - 15-44 1,628.91 1,650.00 189.66 15-45 - 15-45 - 15AS 1,447.96 1,475.00 190.76 15-45 - 15-45A- 1 SASA 1,447.96 1,475.00 190.76 15A5 - 15-45APB1 - 15d5APB1 1,447.96 1,475.00 190.76 15AS - 15-45APB2 - 15d5APB2 1,447.96 1,475.00 190.76 15A5 - 15-456 - 15<5B 1,447.96 1,475.00 190.76 15-45 - 15-45BPBI - 15A5BPB1 1,447.96 1,475.00 190.76 15A5 - 15-45C - 15-45C 1,44296 1,475.00 190.76 15A5 - 15-45CPB1 - 15-45CPB1 1,447.96 1,475.00 190.76 15<5 - 15-45D - 15-45D 1,447.96 1,475.00 190.76 15-45 - 15-45DPB1 - 15A5DPB7 1,447.96 1,475.00 190.76 15-45 - 15-45PB1 - 15-45PB1 1,447.96 1,475.00 190.76 15AB-15-46-1546 1,720.89 1,750.00 92.02 15-46 - 15-46L1 - 15-46L1 1,720.89 1,750.00 92.02 1 SAS -15-46L1 PB1-15-46L1 P81 1,720.89 1,750.00 92.02 K 3/22/2019 2 19:17AM Page 3 of 3 COMPASS 5000.1 Build 81D Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 Quick Test Sub to Otis 1.1 ft -- — Top of 7" Otis 1 0.0 ft 4 COR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub 7-1116" 6x Flange x 7.Olis Box Top of Annular 6.0 ft lirll 7 1118 Top of Annular Element 6.7ft Annular Bottom Annular C1 Blind/Shears 9.3ft Ci 2-3/8" Pipe/Slips 10.1 ft B1 L B2 BS 14 Choke Line Kill Line C 2-3/8" x 3-1/2" VBRs 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CL Of Top Swab 16.0tt �— Swab Test Pump Hose i T1 i T2 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LD�----S O IA OA LDS O Ground Level 0 Remark: AOGCC PTD No. 219-045 Coordinate Check 28 March 2019 INPUT Geographic, NAD27 PBU 15-27A Latitude: 70 17 58.12300 Longitude: 148 34 29.22200 OUTPUT Stale Plane, NAD27 5004 -Alaska 4, U.S. Feet 1/1 NorthingN. 5961157.198 EastinglX: 675967.784 Convergence: 1 20 30.57409 Scale Factor: 0.999935175 Corpscon v6.0.1, U.S. Army Corps of Engineers TRANSMITTAL LETTER CHECKLIST WELL NAME: 4'S/V 2r ,7 PTD: � 19 — 0 ✓ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_ -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company_Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company– Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Namel must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 da s after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHHOE BAY UNIT 15-2713 — Program DEV _ Well bore seg ❑ PTD#.2190450 Company BP EXPLORATION (ALASKA) INC.__-_ _ _ Initial Class/Type DEV/PEND GeoArea 690 _ ----Unit EU-- On/Off Shore O4 Annular Disposal ❑ Administration 1 Permit fee attached. _ _ _ _ _ _ _ _ _ NA. Date . Commissioner Date 12 Lease number appropriate Yes _ Surface Location lies within ADL0028306; Top Prod Int & TD lie within ADL0028303..... I'I3 Unique well. name and number ........ _ _ Yes ......... . . i4 Well located in. a_defined pool.. . . . . . ......... Yes _ PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 3410 .................... _ _ _ 5 Well located proper distance from drilling unit boundary . . . . ....... . . . . Yes CO 3416, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be 6 Well located proper distance from other wells_ .... Yes _ _ opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO 7 Sufficient acreage available in.drilling unit _ _ _ _ Yes 3410, Rule 2.. 8 If deviated, is wellbore plat included _ Yes 9 Operator only affected party- - - - - - - - - - - --- - - - - Yes - 10 Operator has. appropriate bond in force _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 11 Permit can be issued without conservation order .............. . . . . . . . ... . Yes Appr Date 12 Permit can be issued without administrative_ approval . . . . . . . . ........... . . . . Yes _ 13 Can permit be approved before 15 day wait_ Yes SFD 3/28/2019 _ _ _ _ _ _ _ _ _ _ 14 Well located within area and.strata authorized by Injection Order # (put 10# igcomments)_(For. NA....... . 15 All wells _within 114. mile area. of review identified (For service well only)...... _ _ _ _ NA... _ 16 Pre -produced injector: duration of pre production less than 3 months (For service well only) .. NA 17 18 Nonconven, gas conforms to AS31,05.030U.1.A),(j.2.A-D) _ _ _ _ _ _ _ _ _ _ Conductor string_ provided. .......... .... . . . . . _ . NA, . NA_ _ _ .. . _ _ _ _ _ CTD sidetrack belexistin ow. g_produclion tubing from production liner Engineering 19 Surface casing. protects all known USDWs _ _ _ _ _ _ ... NA _ _ _ CTD sidetrack be)ow.existing_production tubing from production liner 20 CMT vol adequate to circulate. on conductor & surf.csg _ . _ _ _ _ _ _ _ _ _ _ NA . CTD sidetrack below existing_ production tubing from production liner 21 CMT vol adequate to tie-in long string to surf csg. . . . . . . . ......... . _ . NA _ _ _ _ CTD sidetrack below.existing.production tubing from production liner _ 22 CMT, will coverall known. productive horizons . . . . . . ..... . . . . . . . .. .... NA _ _ _ _ CTD sidetrack, Autonomous Inflow Liner will be uncemented, entire lateral in the reservoir 23 Casing designs adequate for C,.T B & permafrost.... _ _ _ _ _ ... _ _ _ _ _ Yes 24 Adequate tankage or reserve pit .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes ... _ _ CDR 2 will be on continuous operations. 25 If a, re -drill, has. a 10-403 for abandonment been approved _ _ . _ .... _ _ .... NA_ _ _ Extending the lateralin the existing pool _ _ _ 26 Adequate wellbore separation proposed. _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ ..... Meets all. BP wellbore separation criteria ... 27 If diverter required, does it meet regulations _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ NA_ _ _ _ _ _ CTD sidetrack Appr Date 28 Drilling fluid program schematic & equip list adequate, . ... . .. . . . . . . . ........ . Yes ...... _ . MGR 4/11/2019 29 BOPEs, do they meet regulation . . . . ... . .. . . . . . . ... . . . ........ . . Yes _ _ _ .... 5K BOPE tested to 3L500 psi _ _ _ .............. 30 BOPE press rating appropriate; test to (put prig in comments)_ _ _ _ _ _ _ _ .... Yes _ _ 5K BOPE tested to 3500 psi 31 Choke manifold complies w/API RP -53 (May 84) _ .. _ _ _ _ _ _ _ _ _ _ _ _ Yes 32 Work will occur without operation shutdown. _ _ _ _ _ _ _ _ _ Yes 33 Is presence. of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .... Yes _ _ _ _ _ _ DS15. is considered an H2S_ pad._ BP standard monitoring in place............ 34 Mechanical. condition of wells within AOR verified (For service well only.). _ . _ _ _ NA _ _ _ . Development well _____ 35 Permit can be issued w/o hydrogen sulfide measures .... _ _ No. _ _ .... _ DS 15 wells are H2S-bearing. H2S measures are required. Geology 36 Data presented on potential overpressure zones _ _ _ _ _ ... Yes .... _ _ Expected reservoir pressure is 7,45 ppg EMW; will be drilled using.8:4 ppg mud &. coiled.tubing, Appr Date 37 Seism ie analysis of shallow gas zones _ _ _ _ _ _ ______ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ Should higher pore.pressures be encountered, BP has. immediate access to nearby fluid.mixing facilities.. SFD 3/28/2019 38 Seabed condition survey.(if off -shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ....NA.. _ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ _ _ _ .. . .. ... . . . .... . . ..... 39 Contactname/phone for weekly progress reports [exploratory only] ...... . . . . .... . . NA_ Geologic Engineering Public Commissioner: Date: Commissioner: Date . Commissioner Date