Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-045CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and
know the content is safe.
From:Regg, James B (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: Producer 15-27 ( #219045) TTP Set Tubing & PC leak
Date:Saturday, December 31, 2022 11:53:16 AM
Attachments:image001.png
PBU 15-27B (PTD 2190450)
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Friday, December 30, 2022 8:26 AM
To: Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>
Subject: NOT OPERABLE: Producer 15-27 ( #219045) TTP Set Tubing & PC leak
Mr. Regg,
Producer 15-27 (PTD #219045) was identified with TxIA communication and sustained casing pressure on 12/04/22 after failing TIFL. The well has been secured with a tubing plug at 11332’
and a failing CMIT-TxIA was performed on 12/13/22. Subsequent leak detection logging identified TxIA + PC leak. At this time, the well is classified as NOT OPERABLE and will remain shut in
until well barriers are restored.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659-5102
M: (907) 232-1005
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Tuesday, December 6, 2022 11:09 AM
To: jim.regg@alaska.gov
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15-27B (PTD #219045) TIFL Failed, Exceeded IA MOASP
Mr. Regg,
Producer 15-27 (PTD #219045) was reported by operations to have rapidly increasing IA pressure on 12/4/22 and the well was shut-in. The well then failed a TIFL later on 12/4/22 indicating afailure of one or more barriers. IA pressure exceeded MOASP at 2373 psi on 12/4/22. The well is now classified as UNDER EVALUATION and is on the 28-day clock for diagnostics.
Plan Forward:
1. Slickline: Set DGLV
2. DHD: Re-TIFL
3. Further diagnostics as necessary
Please respond with any questions.
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Engineer
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you arehereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly andpermanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data.No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
DATA SUBMITTAL COMPLIANCE REPORT
9120/2019
Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-276 Operator BP Exploration (Alaska) Inc. API No. 50-029-22243-02-00
MD 16512 TVD 8704 Completion Date 6/24/2019 Completion Status 1 -OIL Current Status 1-0I1- UIC No
REQUIRED INFORMATION /
Mud Log No ✓ Samples No Directional Survey Yes t/
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES, GR/CCURPM
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
ED C 30962 Digital Data
ED C 30962 Digital Data
ED C 30962 Digital Data
ED C 30962 Digital Data
ED C 30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
ED
C
30962 Digital Data
(from Master Well Data/Logs)
Log Log Run Interval OH/
Scale Media No Start Stop CH Received Comments
14403 16512 7/8/2019 Electronic Data Set, Filename: 15-
27B LWD FINAL FIELD COMPOSITE 06JUN2
AOGCC Page] of 3 Friday, September 20, 2019
019_BHI_CTK.las
7/8/2019
Electronic File: 15-
27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B
HI_CTK.cgm
7/8/2019
Electronic File: 15-
27B_GR_Res _ 21JUN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
7/8/2019
Electronic File: 15-
27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B
HI_CTK.pdf
7/8/2019
Electronic File: 15-
27B_GR Res_ 21JUN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.pdf
7/8/2019
Electronic File: 15-27B Final Field Surveys.csv
7/8/2019
Electronic File: 15-278 Final Field Surveys.xlsx
7/8/2019
Electronic File: 15-27B Final Surveys.pdf
7/8/2019
Electronic File: 15-27B Final Surveys.txt
7/8/2019
Electronic File: 15-
27B_25_tapescan_BHI CTK.txt
7/8/2019
Electronic File: 15-27B_5_tapescan_BHI_CTK.txt
7/8/2019
Electronic File: 15-27B_output.tap
7/8/2019
Electronic File: 15-
27B_GR_Res _ 21JUN2019_MD_FINAL_FIELD_B
HI CTK.tif
AOGCC Page] of 3 Friday, September 20, 2019
DATA SUBMITTAL COMPLIANCE REPORT
9/20/2019
Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-27B Operator BP Exploration (Alaska) Inc. API No 50-029-22243-02-00
MD 16512 TVD 8704 Completion Date 6/24/2019
ED C 30962 Digital Data
ED C 30962 Log Header Scans
ED C 31172 Digital Data
ED C 31172 Digital Data
ED C 31172 Digital Data
ED C 31172 Digital Data
ED C 31172 Digital Data
ED C 31172 Digital Data
ED C 31172 Log Header Scans
Well Cores/Samples Information:
Name
INFORMATION RECEIVED
Completion Report 10
Production Test Information Y /MAI
Geologic Markers/Tops
AOGCC
Interval
Start Stop
Completion Status 1 -OIL Current Status I.OIL UIC No
7/8/2019 Electronic File: 15-
27B_GR_Res _ 21JUN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.tif
0 0 2190450 PRUDHOE BAY UNIT 15-27B LOG
HEADERS
11200 16466 9/4/2019 Electronic Data Set, Filename: 15-
27B_MRPM_ PNC3D_RAW_PASS0I UP_22JUL2
019_BHl.las
12100 12300 9/4/2019 Electronic Data Set Filename 15 -
Directional / Inclination Data
Mechanical Integrity Test InformationlYY INA
Daily Operations Summary I Y )
Page 2 of 3
Mud Logs, Image Files, Digital Data Y Core Chips Y /
Composite Logs, Image, Data FilesY Core Photographs Y /
Cuttings Samples Y NA Laboratory Analyses Y NA
Friday, September 20, 2019
27B_MRPM_PNC3D_RAW_PASS02UP_22JUL2
019 BHI.las
9/4/2019
Electronic File: 15-
27B_MRPM_ PNC3D_RAW_PASS0IUP_22JUL2
019 BHI.dlis
9/4/2019
Electronic File: 15-
27B_MRPM_PNC3D_RAW_PASS02UP_22JUL2
019 BHI.dlis
9/4/2019
Electronic File: 15-
27B_MRPM_PNC3D_RAW_22JUL2019_BHl.met
a
9/4/2019
Electronic File: 15-
27B_MRPM_PNC3D_RAW _22J U L2019_B H I.P D
F
0 0
2190450 PRUDHOE BAY UNIT 15-27B LOG
HEADERS
Sample
Set
Sent Received Number
Comments
Mud Logs, Image Files, Digital Data Y Core Chips Y /
Composite Logs, Image, Data FilesY Core Photographs Y /
Cuttings Samples Y NA Laboratory Analyses Y NA
Friday, September 20, 2019
DATA SUBMITTAL COMPLIANCE REPORT
9/10/2019
Permit to Drill 2190450 Well Name/No. PRUDHOE BAY UNIT 15-27B Operator BP Exploration (Alaska) Inc.
MD 16512 TVD 8704 Completion Date 6/24/2019 Completion Status 1-0I1 Current Status 1-011-
COMPLIANCE
-OILCOMPLIANCE HISTORY
Completion Date: 6/24/2019
Release Date: 4/12/2019
Description Date Comments
Comments:
Compliance Reviewed By:
API No. 50-029.22243-02-00
Date: It <?
UIC No
AOGC'C Page 3 of 3 Friday, September 20, 2019
BA M 0 PRINT DISTRIBUTION LIST
i UGHEB
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME 15-27B
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
AUTHORIZED BY Frank Schwarzrock
EMAIL frank. schwarzrock(a)bhge.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
4
BP North Slope.
FOA, PBOC. PRB-20 (Office 109)
D&C Wells Project Aids Agatha Burka & Barbara Glassmakcr
900 E. Benson Blvd,
Anchorage, Alaska 99508
I'm
219045
31172
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, 1-112-1
1 E. Benson Blvd.
:horage, Alaska 99505 or AKGDMINTERNAL@bp.com
LOG TYPE RPM:PNC3D
LOG DATE July 22, 2019
TODAYS DATE September 1, 2019
Revision
Details:
Rev. Requested by: --
FIELD/
FINALCD/DVD
FINAL
PRELIM
I
las, dlis, PDF, META,
(CGM,
SURVEY
REPORT
LOGS
LOGS
Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
1# OF COPIES
V
4 jj
2 ConocoPhillips Alaska Inc. RECEIVED i
Attn: Ricky Elgarico SEP 0 4 2019
ATO 3-344
788 G Street
AOGCC
Anchorage.
AK 99501
3 EsxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC '1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas •`.
Attn: Garret Brown
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: David Itter 0
TOTALS FOR THIS PAGE: 0 1 4 0 0
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Reddil ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set LTP 0
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0 Exploratory ❑
S. Permit to Drill Number 219-045
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Straligraphic ❑ Service ❑
1 6. API Number: 50-029-22243-02-00
7. Property Designation (Lease Number): AOL 028306 & 028303
S. Well Name and Number: PBU 15-27B
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth: measured 16512 feet Plugs measured None feet
true vertical 8704 feet Junk measured None feet
Effective Depth: measured 16458 feet Packer measured 11165 feet
true vertical 8706 feet Packer true vertical 7960 feet
Casing: Length. Size: MD: TVD: Burst: Collapse.
Conductor 80 20" 29-109 29-109 1490 470
Surface 3457 13-3/8" 29-3486 29-3485 3450/5020 1950/2260
Intermediate 3784 9-5/8" 26-3810 26-3809 6870 4760
Liner 7788 7" 3658-11446 3657-8191 7240 5410
Liner 3132 4-1/2" 11271-14403 8047-8717 8430 7500
Liner 5135 2-7/8" x 2-3/8" 11329 - 16464 8095-8705 11199 11776
Perforation Depth: Measured depth: 15457 - 16433 feet
True vertical depth: 8726-8706 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 24-11279 24-8054
Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 11165 7960
true vertical depth)
No SSSV Installed
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Subsequent to operation:
1818
7700
5
0
1004
14. Attachments: (re uired,r2o nnc 25.07025.071, s 25.283)
15. Well Class after work:
Daily Report of Well Operations 0
Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑
16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑
Copies of Logs and Surveys Run ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
Sun dry Number or N/A if C.O. Exempt:
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
MA
WA
Authorized Name: Brown, Don L. Contact Name: Brown, Don L.
Authorized Tide: Petroleum Engineer Contact Email: bmwd2ABP.com
t/�'�1
_ -
Authorized Signature: 061-1 Ce t"e �r 1 Date: g 9 c� Contact Phone: +1 9075644675
Form 10.404 Revised 04/2017 / 01 1 MMSIF'JAUG 2 12019 Submit Original Only
Daily Report of Well Operations
PBU 15-27B
7/23/2019
'WELL S/I ON ARRIVAL*** (Post CTD)
UNABLE TO PASS DEPLOYMENT SLV AT 11,325' SLM W/ 2.25" x 10' BAILER.
DRIFT TO DEVIATION AT 12,252' SLM W/ 2.00" CENT, 1.75" x 10' BAILER (No issues).
RAN READ 24 ARM CALIPER FROM 12,275' SLM TO SURFACE (Good data).
RAN DUMMY 45KB PACKER W/ DUMMY PTSA TO 11,325' SLM (Ring on brass TT lugs).
'*'JOB IN PROGRESS, CONTINUED ON 7/24/19 WSR***
**'CONTINUED FROM 7/23/19 WSR*'* (Post CTD)
SET BAKER 45KB PACKER, NS PTSA W/2.313" XX RSG AT 11,322'M (11,323' MOE).
****OAL = 10.99'- Min id = 2.313" AT X -NIPPLE IN PTSA AT 11,332' MD****
LRS PERFORMED SUCCESSFUL PRESSURE TEST ON LTP TO 2560 PSI.
SET 4-1/2" X -CATCHER IN 4-1/2" X -NIPPLE AT 11,191' SLM / 11,196' MD.
PULL BK-DGLV FROM ST #2 (7,778' MD) & RK-DGLV FROM ST #3 (3,549' MD).
SET RK-LGLV AT ST #3 (3,549' MD) & BK-OGLV AT ST #2 (7,778' MD).
CURRENTLY RIH W/ 4-1/2" GR TO PULL X -CATCHER SUB AT 11,196' MD.
7/24/2019
***JOB IN PROGRESS, CONTINUED ON 7/25/19 WSR***
'**CONTINUED FROM 7/24/19 WSR*'* (Post CTD)
PULL EMPTY 4-1/2" X -CATCHER SUB FROM 4-1/2" X -NIPPLE AT 11,196' MD.
EQUALIZE & PULL 2-7/8" XX -RSG BODY FROM 2-7/8" X -NIPPLE AT 11,332' MD.
SET 4-1/2" X -LOCK -FLOW THROUGH SUB W/ BP TANDEM GAUGES AT 11,196' MD.
RAN 4-1/2" CHECK SET TO 4-1/2" X -LOCK AT 11,196' MD (Tool indicates good set).
7/25/2019
*'*WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS**'
TREE =
WELLHEAD =
FMC
ACTUATOR=
16176
OKB_ ELEV =
6T
REF ELEV =
60.35'
BF._ELEV =
33.99'
KOP =
3810'
Max Angle =
96' 12521'
DaWrn MD =
Dah9n TVD =
NA
8800' SS
91.5 #, H-40,
D=19.124'
13-3/8' CSG, 68#, K-55 XO TO L-80
1338' CSG, 68#,L-80, ID =12.415"
19-58' CSG, 47#, L-80, D = 8.661' —3810'
Minimum ID = 2.313" @ 11332'
2-7/8" X NIPPLE IN PTSA
4-12' TBG, 12.6#, 13CR-85 VAM TOP,11279'
.0152 bpf, D = 3.958'
45KB BKR LTP w/ NS PTSA (0724119) 11322'
TOP OF 3-12' X 2-78' X 2-38' LNR 11329'
2-78' X NIP, D = 2.313' H 11332'
15-27B
3-12' LNR, 9.3#,13CR-85 STL, .0087 bpf, D = 2.992' 14319'
412' BKR WHPSTOCK (05)23/19) 14403'
4-1/2' LNR, 12.6111, L-80 BT -M, -14403'
.0152 bpf, D = 3.958'
2-78' LNR, 6.5#, 13CR-85 STL, .0058 bpf, D = 2.441' 15202-
9 374' X 3475" OH PACKFRS_ ID =1996^
TENDEKASWELLPKRNO
DEPTH
6
16176
5
15931'
4
15756'
3
15559
2
15406
1
15344'
INS 14JECTION VALVE - PBTD II 16458'
2-38- LNR, 4.7#, 13CR$5 HYD511, 16464'
.0039 bpf, D =1.995'
SAFL NOTES: WELL ANGLE > 70' @ 12145'.
MAX DLS: 18' @D 15492'. "'4-1/2' CHROME TBG &
LNR""
3 3549 3548 1 MM 00ME RK is 0724/19
2 7778 6128 64 KBG2 SO BK 20 0724/19
1 11096 7902 34 KBG2 DMY BK 0 05/18/10
3658' 1-19-5/8" X 7'
ITIEBACK SL6=V E, ID = 6.180'
3673' 9-518' X 7' BKR FLD(LOCK LNR HGP
[)=6.180"
MLLOUT WINDOW (15-27A) 3810'-3827-
( 4-12- HES X NIP. D = 3.813"
11166' 1-j7' X 4-1/2" HES TNT R(R. iD = 3.858'
11196' 4-1/Y HES X NP, D= 3.813'
11196' 412' XLOCK FLOWfHRU SUB w/DH GAUGES
11266- 4-12' HES XN NP MILLED TO 3.80' (520/19)
11271' 17' X 5' ZXPN HRD-E LTP w BKR FLIX-LOCK
HGR & TIEBACK SLV, ID = 410'
11279'
4-1/2'WLEG, D=3.958'
1129T5'X4-1/2-XO,D=3.820'
15
113- 29-
310- DEPLOYSLV, D =
13-112'X 2-78' XO. D= 2.360' 1
MLLOUT WINDOW (15-276)14403' -14407'
15202' 2-7/8' X 2-3/8' XO, D =1.910'
2-1W AICfMRPV 3LIR JOINT_ ID =1.995'
NO
DEPTH
NO. AICD
15
16933'
14
16392'
07/10/19 JMD DRLG HO CORRECTIONS
13
16320'
12
1624T
11
16134'
10
16061'
9
16019'
8
15890'
7
15848'
6
1580T
5
15705'
4
15663'
3
15622'
2
15499'
1
1595T
DATE REV BY COMMENTS
DATE REV BY COMMENTS
0211582 ORIGINAL COMPLETION
0881/19 JH/JMD FINAL ODE APPROVAL
05H9110 N7ES SIDETRACK (1S -27A
0624M9 N-CDR2 CTDST(15-27B)
07/10/19 JMD DRLG HO CORRECTIONS
0731/19 EPD/JMD GLV C/O (07124119)
0731119 EPD/JMD SET LTP w/PTSA & FLOTHRU SUB xdGAUAGES
PRUDHOE BAYUNR
WELL: 15-278
PERMR No: 219-045
API No: 50,029-22243-02
Winston, Hugh E (CED)
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Thursday, August 1, 2019 10:46 AM
To: AOGCC Reporting (CED sponsored)
Subject: POP PBU 15-27B / PTD # 219-045
Hello,
Please reference the following well:
Well Name: PBU 15-27A
Permit #: 219-045
API #: 50-029-22243-02-00
Date of Test: 7/29/19
Type of Test: IPT (Initial Production Test)
Choke Size: 26
Choke Unit:
Production Method: Flowing
Duration (Hours Tested): 4
Top Reference (Top Perf MD): 15457'
Bottom Reference (Bottom Perf MD): 16433'
Tubing Flowing (Pressure): 207
Casing Pressure: 1202
Total Test Rate (O, G, W): 125 / 67 / 2
24 -Hour Rate (O, G, W): 751/400/10
Gravity (Oil, API): 32.2
GOR (Gas -Oil Ratio): 533
This well began Production on
Method of Operations on this date: July 27, 2019
RgpMjko 0 12919
STATE OF ALASKA
\L SKA OIL AND GAS CONSERVATION COMMIS' N
WELL -IMPLETION OR RECOMPLETION REPO, AND LOG
11-4 X. %.P L.l V Is LA
JUL 2 4 2019
la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
GINJ 13 WINJ ❑ 20MC 25 .105 20AAC 25.110
WAG ❑ WDSPL ❑ No. of Completions: One
11b. Well Cla y`�)fl� f'fl�Y.
DavalOprrlefR $ ShAr❑
¢'
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
6/24/2019
219-045 '
3. Address:
7. Date Spudded:
15_ API Number:
P.O. Box 196612 Anchorage, AK 99519-0612
6/16/2019
50-029-22243-02-00
4a. Location of Well (Governmental Section):
8, Date TO Reached:
16. Well Name and Number
6/20/2019
PBU 15-278
Surface: 324' FNL, 58' FWL, Sec. 22, T1 IN. R14E. UM r
9 Ref Elevations KB 60.35 -
17. Field/Pool(s):
Top of Productive Interval: 478' FSL, 1203' FWL, Sec. 10, T1 IN. R14E, UM
31�
GL 32.21 BF 33.99
PRUDHOE BAY. PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 392p' FSL, 292' FEL, Sec. 09, T1 IN, R14E, UM •
16458';8706'
ADL 028306'& 028303
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11, Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 675968 y- 5961157 Zone - ASP 4
16512'18704'
78-084
TPI: x- 676957 y- 5987265 Zone - ASP 4 -
12. SSSV Depth (MDr VD):
20 Thickness of Permafrost MDRVD:
Total Depth: x- 675375 y- 5970700 Zane - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21, Re-dnll/Lateral Top Window
MD/ND:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
14403'/ 8717•
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, GR/CCL/RPM
23. CASING, LINER AND CEMENTING RECORD
CASING
Wf, PER
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
91.5#
H o
29'
109'
29'
109'
30"
232 cu It Coldest II
13-3/8"
68#
K -55/L-90
29'
3486'
29'
3485'
16"
2584 ou ft Coldset III, 460 cu fl Class'G'
9-5/8"
47#
L -ea
26'
3810'
26'
3809'
12-1/4"
2780 cu It Class'G'
T.
26#
L -e0
3658'
11446'
3657'
8191'
8-1/2"
221 ou it Class'G', 422 ou ft Class'G'
4-1/2"
12.6#
L-90
11271'
14403'
8047'
8717'
6-1/8"
505 or It Class'G'
2-718".2-3/8-'1&5#141.7#
tscres
1 11329'
16464'
8095'
8705'
4-1/4"
Uncemented Liner w/ AICD B Swell Packers
24. Open to production or injection? Yes 0 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom, Perforation
Size and Number; Date Perf l):
GRADE DEPTHSET (MD) PACKER SET (MD/TV
4-1/2" 12.6# 13Cr85 11279' 11165'17960'
2-3/8" Liner w/AICD 6/23/2019
15457' 8726' 16247' 8711'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
15499' 8727' 16320' 8710' COMPLETION
15622' 8731' 16392' 8708'
15663' 8731' 16433' 8706' D TE
Was hydraulicfracturing used during completion? Yes ❑ No 0
Per 20 AAC 25.283 (i)(2) attach electronic and printed
15705' 8729' Z zo(o
information
15807' 8724' t
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
15848' 8723' V IFI D
15890' 8720'
16019' 8718'
Freeze Protect w/ 245 Bible Diesel
16061' 8716'
16134' 8714'
27. PRODUCTION TEST
Date First Production: Not on Production
Method of Operation (Flowing, gas lift, etc.): WA
Dale of Test:
Hours Tested:
Produ dim for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Sire
Gas -Oil Ratio:
Test PeHod --►
Flow Tubing Casino Press. Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API room:
Press 24
Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
Af* M&Ii RBDMS-q�''JUL 2 5 2019 r7t-s V11(q G
28. CORE DATA Conventional Corals) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presenceof oil, gas orwater
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MO
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost- Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
12218'
8717•
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
TDF - Zone 1A
12218'
8717'
Kicked off from Parent Well
14403'
8717' '
(15-27A)
Formation at total depth:
Zone 1A
12218'
8717'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name. Hartley, Josephine
Authorized Title: ecialist Contact Email: Josephine.Hartley@bp.com
Authorized Signature: Date:1/7.4I 1 Contact Phone: +1 9075644570
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a wail schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in Rem 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the coresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this formwell schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
WELLHEAD=
FMC
ACTUATOR=
16175'
OKB. R =
6T
REF ELEV =
60.35'
BF. ELEV =
33.99'
KOP=
3810'
W16x Angle =
96'@ 12521'
Daban WD=
NA
Dabs TVD=
8800SS
U
JMD DRQ' T 15-2T,
1 109'
9t5 #, H14
D =19.124'
3/8' CSG, 68#, K-55 XO TO L-80 113'
13-31W CSG, 6Bl{,L-80, D =12.415' —C
Minimum ID = 3.725" @ 11266'
4-1/2" HES XN NIPPLE
9-5/8' WHPSTOCK (04/12/10) —F-3
4-1/2' TBG, 12.6#, 13CR-85 VAM TOP. 11279'
.0152 bpf, ID = 3.958'
1 11329' 1
14403'
1.0152 bpf, D = 3.958•
LNR 6.5#, 13CR-85 ST-, .0058 bpi, D = 2.441• 15202'
2374' X 3-475' OH PACKERS. I0=1.995"
TENDEKA SWB-L PKR NO
DEPTH
6
16175'
5
15931'
4
15755
3
15550
2
15406'
1
15344'
NS�
13CR415 HYD511, .0039 L
SAFE
/OTES: WELL ANGLE> 70'@ 12145'.
MAX ,:
18" @ 15492'. •'•4-12" CHROME TBG&
LNR"'
VLV
LATCH
4-12' HES X NP, 1)= 3.813•
2234'
3
GAS LFT MANDRELS
ST
WD
ND
OEV
TYPE
VLV
LATCH
PORT
DATE
3
3549
3548
1
Mr%'
DOW
RK
16
05/23/10
2
7778
6126
64
KBG2
SO
BK
20
0523/10
1
11096
7902
34
KBG2
OMY
BK
0
05/18110
TEBACKSLEEVF D=6.180'
3673' 9-58• X T BKR FLEK K LNR HGR
D = 6.180'
MLLOUTWINDOW(16-27A) 3810'-3827-
1113V 4-12-HESXNP,D=3.813'
11165* 17'
X 4-1/2' HES TNT PKR D = 3.858'
11196'
11266'
4-12'HES X NP, D=3.813'
4-12' HES XN NP, D = 3.725°
11271'
T X5'=HRDELTPw BKRFLEX-LOCK
HGR 8, TEBACK SLV, D = 4 20'
14
11278' 4-12'YVLBG,D=3.958'
11� 5' X 4-12' XO. D = 3.920'
11329• 11370' DE3'LOY SI
11345' 3712' X P
1 1431W 1131/2' X 2-7/8' XO, D =2.360'
MLLOUT WNDOW (15-27B) 14403'-14407'
5202 2-7/8' X 2-318' XO, D =1.910'
2-3/8" A1COMW SIIBJOINT- ID =1.985'
NO
DEPTH
NO. ADD
15
1643T
14
16392'
07/10/19 AD OFa-G HO CORRSMIONS
13
16320'
12
16247'
11
16134'
10
16061'
9
18019'
8
15890'
7
15848'
6
15807'
5
15705'
4
15663'
3
15622'
2
15499'
i
1 15457'
TATE RP/ BY OOkTA3w5
DATE F?EV BY COWRUENTS
02/15182 ONQUAL COMPLETION
06719/10 MFS SIDETRACK(15-27A)
06721179 N-COR2 CTD ST (15278)
07/10/19 AD OFa-G HO CORRSMIONS
PFUDHOE BAY LME
WELL 15-278
FEFUT Nb: 219-045
AR Nb: 50-029-2224302
. T11 N. RUE. 324' ETL & 58TWt
WL
North America - ALASKA- BP
Operation Summary Report
Page 1 of 13
Common Well Name: 15-27
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/13/2019
End Date: 6/21/2019
X3-019FG-C: (2,422,018.00 )
Project: PBU
Site: 15
Rig Name/No.: CDR -2
Spud Date/Time: 1/20/1992 12:00 OOAM
Rig Release: 5/2412019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
6/13/2019 06:30 - 07:00 0.50
MOB P
PRE
PREP TO MOVE OFF F -34C
07:00 - 09:00 2.00
MOB P
PRE
PRE JOB SAFETY MEETING WITH CREW AND
09:00 - 14'.00 5.00 MOB P
1400 - 1630 2.50 MOB P
1630 - 1830 2.00 MOB P
18:30 - 00:00 5.50 RIGU P
I
6/1412019 00:00 - 03:30 3.50 RIGU P
03:30 - 04:00 0.50 RIGU P
04:00 - 0700 3.00 RIGU P
TRUCK DRIVERS.
i- EMPHASIS ON GOOD COMMUNICATION,
VERIFY STOP COMMAND.
'- STOP BLOCK IN PLACE TO PREVENT RIG
FROM ROLLING BACKWARDS INTO WELL.
- VALVES ON TREE SHUT IN AND ALL
ANNULUS PRESSURES LESS THAN 50 PSI.
- DRILL SITE OPERATOR NOTIFIED AND
DECLINED WITNESSING RIG MOVE OVER
WELL.
-- ANYONE CAN STOP THE JOB AT ANYTIME
BE WATCHFUL
- MOVE MAIN AND PIT SUBS OFF WELL
INSTALLJEEPS
PRE MOVE TO DS 15
PRE RIG ON DS 15
-REMOVE JEEPS
-_SPOT MAIN SUB THEN INSTALL_ CRAWLER
PRE -SPOT RIG WITH CRAWLER
. - PJSM TO REVIEW PROCEDURE AND ASSIGN
SPOTTERS
- MOVE RIG BACK, TEST E -STOP, E -STOP
SHUT DOWN THE HYDRAULICS
- SPOT RIG OVER WELL
- RIG SPOTTED, HOLD AAR
-RD CRAWLER
- SPOT PITS
"'RIG ACCEPTED AT 18:30"'
PRE PJSM,
- RIG UP CHECKLISTS
- LTT BETWEEN SWAB AND MASTER TO
3500#. GOOD TEST
- NIPPLE UP MPD LINE, NIPPLE DOWN TREE
CAP.
- EVACUATE FLUID DOWN TO SWAB VALVE.
-INSTALL 7.06" TEST PLUG IN TEST SPOOL.
(1-112" MT BOX)
-NIPPLE UP BOPE
PRE NIPPLING UP BOPE
- PREPARE TEST JOINTAND TIWS
-INSTALL INJECTOR, REPLACE PACK -OFFS.
- VALVE CREW CHECK TORQUE ON TREE
BOLTS
PRE PRESPUD WITH WARDS (MICAH-S) CREW
PRE FLUID PACK FOR BOPE TESTING
-SHELL TEST BOPE
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths"
Common Well Name: 15-27
Event Type: RE-ENTER- ONSHORE (RON)
Protect: PBU
North America - ALASKA - BP
Operation Summary Report
Start Date. 6/13/2019 End Date: 6/21/2019
Site: 15
Spud Date/Time'. 1/20/1992 12:OO:OOAM
AFc No
X3-019FG-C. (2,422,018 00 )
Rig Release: 6/24/2019
Page 2 of 13
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usft (above
Mean Sea Level)
Date From - To
Hrs
Task Code NPT Total Depth
Phase Description of Operations
(hr)
(usR)
07:00 - 21:00
14.00
BOPSUR P
PRE PERFORM BI -ANNUAL BOPS TO 25015000 PSI
AS PER BP AND AOGCC REGULATIONS.
ALL RAMS TESTED ON RAM LOCKS
TEST GAS ALARMS: PASS
TEST WAIVED BY AOGCC REP LOU
LAUBENSTEIN
TEST 1: IRV, PACK -OFF, C9 BACKWARDS
AND C10 BACKWARDS TO 3500 PSI - PASS
TEST 2: BLINDS, B1, B4 (5000#) - BLINDS
FAILED MOVE TO TEST #3
TEST 3: ANNULAR 2-3/8"(3500#) THROUGH
TP3, TVI, TV2- PASS
TEST4: UPPER 2-3/8"PIPE/SLIP, TIW#1, 818
B4 AND R1, BL1A (5000#) - PASS
TEST 5: R2, C15, BL2, TIW#2 (5000#) - PASS
TEST 6: C16, C11, BLI (5000#)- PASS
TEST 7: C9, CIO, C7 (5000#) -PASS
TEST 8: C5, C6, C8 (5000#) - PASS
TEST 9: CHOKE A, CHOKE C - PASS
TEST 10: CI, C4, VBR's, TV1 (5000#) - PASS
'TEST 11: C2, C3, TV2, LOWER 2-3/8"
PIPE/SUP (5000#) PASS
'PERFORM DRAWDOWN TEST - PASS
TEST 12: ANNULAR -3 -1/2"(3500#) -PASS
TEST 13: VBRe— 3-1/2" (5000#) - PASS
TEST 14: C28C3-PASS
TEST 15: C9, C10 TO 4500 PSI PASS
REPAIR BLIND SHEARS AND SIMOPS INSTALL
BHI FLOATS AND TEST 7O 3500#. GOOD
TEST
TEST 16: RETEST BLIND SHEARS AND B3
(5000#) B3 INITIAL FAIL. CYCLE GREASE.
PASS
21:00 - 23.30
2.50
BOPSUR P
PRE - PULL TEST LUBRICATOR B ADAPTER
FLANGE
- PULLTEST PLUG (SEAL INTACT)
- MU ADAPTER FLANGE AND DRILLING
LUBRICATORS
2330 - 0000
0.50
BOPSUR P
PRE PJSM,
- PERFORM 250# 15000# TEST ON T1 PASS
6/15/2019 00:00 - 00:30
0.50
BOPSUR P
PRE PERFORM TEST 250#/5000#ON T2. PASS.
00:30 - 03:00
2.50
RIGU P
PRE RIG DOWN TEST EQUIPMENT.
- REVIEW PROCEDURE FOR PULLTWC /
BULLHEAD
- STAB INJECTOR WITH NOZZLE. LOAD COIL
WITH 8.6 PPG DRILLING MUD
- EVACUATE FLUID TO MASTER VALVE.
VALVE CREW TAKE MEASUREMENTS
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths"
North America - ALASKA - Bia
Operation Summary Report
Page 3of13
Common Well Name: 15-27
AFE No
Event Type: RE -ENTER -ONSHORE (RON) Start Date'. 6/13/2019 End Date: 6/21/2019
X3-019FG-C: (2,422,018.00)
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Datefrime: 1/20/1992 12:00:OOAM
Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr)_ Net)
0300 - 0800 5.00 RIG P PRE
PJSM,
-PU BPV LUBRICATOR. PERFORM
METHANOL PURGE TO TIGER TANK IN
PREPARATION FOR PRESSURE TEST.
-PERFORM PRESSURE TEST 7O 3500#
GOOD TEST.
-ATTEMPT TO GRAB TWC. NOLUCK.
-PERFORM LTT BETWEEN MASTER AND
SWAB TO 3500#.
- BLOW DOWN LUBRICATOR.
- PU THE PULLING LUBRICATOR AND
INSPECT THE TOOL.
- FOUND A ROLLED SHOULDER THAT
WOULDN'TALLOW THE TOOL TO FUNCTION
PROPERLY.
- MU TOOL STAB ON AND PT THE QTS.
- GOOD PT, OPEN M & S VALVES AND PULL
TWC.
- TWC IS PULLED WITH 2500 PSI UNDER
TWC.
CLOSE M&S VALVE, LTT THEN PURGE THE
- LUBRICATOR WITH 10 BBL OF METHANOL TO
THE TT.
RD VC LUBRICATOR.
08:00 - 12:30 4.50 KILLW P PRE
'PJSM,
-INSTALL NIGHTCAP AND PT TO 3500# GOOD
TEST.
-PRESSURE UPTO2500PSI WITH METHANOL
BETWEEN MASTER AND SWAB.
- OPEN MASTER VALVE.
- PUMP 10 BBLS 6.6PPG OF NEAT METHANOL
AT IBPM WITH 257OPSI.
- PUMP 290 BBLS OF 140° 8APPG 1% SLICK
KCL AT 5BPM WITH 2550 ICP.
-AFTER 130 BBLS AWAY PUMP PRESSURE AT
1000PSI.
-AFTER 230 BBLS AWAY PUMP PRESSURE AT
1300PSI.
-AFTER 270 BBLS AWAY PUMP PRESSURE AT
1800PSI.
- SWAP OVER TO HIGH -VIS PILL AND PUMP 44
BBLS. WITH 1850PSI.
- SWAP TO 8aPPG MUD AND PUMP 174 BBLS
AT 5BPM WITH 1850PSI FINAL PRESSURE AT
1960PSI.
- SHUT OFF PUMPSAND PRESSURE BLEEDS
TO 200PSI IN 10 MINUTES.
- PRESSURE DISIPATED TO 0 PSI
- OPEN SWAB AND PURGE LUBRICATOR TO
TIGER TANK WITH 10 BBLS OF MUD.
- LINE UP TO FLOW ACROSS THE TOP TO
ESTABLISH A LOSS RATE IF ANY
- NO LOSSES, FLOW CHECK WELL
- GOOD NO FLOW
- REMOVE NIGHT CAP, MU QTS TO THE
INJECTOR, STAB INJECTOR, CLOSE THE
SWAB AND PT THE QTS
- GOOD PT, OPEN SWAB AND FLOW CHECK
RIG ON HIGH -LINE POWER AT 11:00 HOURS.
Printed 7/8/2019 3:44:34PM "•All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 4 of 13
Operation Summary Report
Common Well Name. 15-27
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6 /1 312 0 1 9 End Date: 6/21/2019
X3-019FG-C: (2,422,018.00 )
Project PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00:OOAM
Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usR (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _ _ lust)
1230 - 1800 5.50 STWHIP P WEXIT
MILL WINDOW OPS
- PJSM TO MU THE MILLING BHA WHILE FLOW
CHECKING WELL
- GOOD NO FLOW, MU THE MILLING BHA
,- RIH WITH MILLING BHA, STOPAT 500' TO
INSPECT PIPE, GOOD RIH
- STOP AT 2500'& 7100' TO CHECK THE
SADDLE CLAMPS
- STOP AND PREP TO LOG TIE IN, OUT
DENSITY STARTING TO DROP OFF, LINE UP
TO TAKE RETURNS OUT TO THE TT
- PURGE LUBRICATOR AS WELL
- DENSITY AFTER LUBRICATOR PURGE STILL
RUNNING 7.9 TO 8.2.
- LOG TIE IN WITH -12' CORRECTION. TAG
WHIPSTOCK 14402'DRY.
1800 - 1930 1.50 STWHIP P 14,402.00 WEXIT
DISCUSS WITH WSUPT.
-CONTINUE TO CIRCULATE BOTTOMS UP TO
TIGER TANK
- DENSITY SLOWLY INCREASING TO WHATS
BEING PUMPED
-BRING BACK INSIDE. FINGERPRINT
_FLOWBACK. _
19:30 - 00:00 4.50 STWHIP P 14,404.90 WEXIT
MILL 3.80" WINDOW IN 4-1/2" LINER PER
BAKER REP FROM 14400.4' MD TO 14404.90'
MD
- RATE: 2.81 BPM IN, 2.80 BPM OUT
- MUD WEIGHT: 8.70 PPG IN, 8.54 PPG OUT
- DWOB: 0.9 — 3.8 KLBS
-CIRC PRESSURE: 3478 PSI
6/16/2019 0000 - 01:30 1.50 STWHIP P 14,406.60 WEXIT
MILL 3.80" WINDOW IN 4-1/2" LINER PER
BAKER REP FROM 14404 90' MD TO 14406.f'
- RATE: 2.81 BPM IN, 2.82 BPM OUT
- MUD WEIGHT: 8.64 PPG IN, 8.50 PPG OUT
- DWOB: 1.4 KLBS
-CIRC PRESSURE: 3478 PSI
01:30 - 05:00 3.50 STWHIP P 14,422.00 WEXIT
MILL 3.80" WINDOW IN 4-1/2° LINER PER
BAKER REP FROM 14406.6'
- RATE: 2.69 BPM IN, 2.71 BPM OUT
- MUD WEIGHT: 8.64 PPG IN, 8.50 PPG OUT
- DWOB: 1.4- KLBS
-CIRC PRESSURE: 3034 PSI
- DROP RATE 0.1 BPM TO CURB SOME OF
THE VIBRATION
- APPEARS WE ARE OFF AT 14407' FULL
TRAY LENGTH WOULD OF BEEN 12.3'
SAMPLE SHOWING 10% FORMATION.
-TIME MILL TO 14409', WOB HAS FALLEN
COMPLETELY OFF. MOTOR WORK HAS
FALLEN OFF ALSO.
- START WORKING ROP UP TO GET SOME
WOB RESPONSE.
- SAMPLE FROM 14409'[S 85% SAND
Printed 7/8/2019 3.44:34PM **All depths reported in Drillers Depths"
Common Well Name. 15-27
Event Type: RE-ENTER- ONSHORE(RON)
PBU
Active datum: RT @60.35usft (above Mean Sea L
Date From - To Hm
(hr)
0500 - 12:30 7.50
1230 - 19:30 7.00
North America - ALASKA - BP
Operation Summary Report
AFE No
Start Date: 6/13/2019 End Date: 6/21/2019 X3-019FG-Cr(2,422,018.00)
Site: 15
Spud Date/Time: 1/20/1992 12'.00:OOAM Rig Release: 6/24/2019
BPUOI: USA00000945
Task Code NPT Total Depth
(usft)
STWHIP P - _ 14,422.00
DRILL P 14,422.00
19.30
- 23:30
4.00
DRILL
N
14,422.00
2330
- 0000
0.50
DRILL
P
14,422.00
6/17/2019 00:00
- 00:30
0.50
DRILL
P
14,422.00
0030
- 0200
1.50
DRILL
N
14,422.00
02:00
- 10:00
8.00
DRILL
P
14,508.00
Page 5 of 13 1
Phase Description of Operations
WEXIT BEGIN REAMING WINDOWAT i FPM 14395-
14410'
- SEEING A LITTLE MOTOR WORK AT THE TOP
OF THE WINDOW
- MAKE A COUPLE MORE PASSES OR UNTIL
CLEAN
- MADE 7 TOTAL PASSES 3 DOWN AND 4 UP
AND WINDOW LOOKS CLEAN
- DRY DRIFT IN BOTH CORRECTIONS CLEAN
- DYNAMIC FLOW CHECK THEN POOH
- STOPAT 13478' AND PAINTA FLAG (WHITE)
- 3900' CHOKE IS PACKING OFF, LINE UP TO
BLOW DOWN RETURN LINE MICRO -MOTION
- 3700' PLUGGED OFF AGAIN, GOT BACK A
LOT OF FLAT METALAND CHUNKS OF CMT
FROM THE BLOW DOWN
-POOH
- FLOW CHECK WELL AND HOLD A PJSM TO
LD AND PU THE BRA'S
- LD THE BHAAND GAUGE MILLS
- INJECTOR OFF AT 12:15
MILLSARE IN GAUGE WINDOW = 3.79 GO
3.78 NO GO, STRING = 3.80 GO 3.79 NO GO
PRODI LATERAL DRILLING OPS
-MU THE DRILLING BHAAND STAND BACK
- CHANGE PACK -OFF AND TEST
- DEPLOY THE BHA, PT THE OTS AND RIH
- 4650' OUT MM PLUGGED OFF AGAIN, BLOW
DOWN
- RIH AT 4.0 BPM IN 14.4 BPM OUT. PUMPED
10 BBLS LOVIS , 20 BBLS HIVIS OUT AT 10540'.
- CONTINUE IN THE HOLE
-LOG TIE IN -27. RUN DOWN AND TAG
BOTTOM. PUMP 10 BBLS LOVIS / 20 BBLS
HIVIS. ONCE PILL IS OUT. START WIPER UP
TO 11000'
-SEEING MARKS ON PIPE. STOP
PROD1 TROUBLESHOOT INJECTOR
- MECHANICS / ELECTRICIANS ARRIVE.
- CHAINS OUT OF SYNC. HAD TO REPLACE
BOTH ENCODERS. _
PROD? LOG CCL FOR LINER TOP
PROD[ FINISH LOGGING CCL
PRODI DRESS PIPE
PRODI DRILL 4-1/4' LATERAL FROM 14424' MD TO
14508'
- FREE SPIN: 3350 PSI, 2.77 BPM
- RATE: 2.77 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3350 - 3656 PSI
- MUD WEIGHT: 8.64 PPG IN, 8.51 PPG OUT,
ECD: 10.2 PPG AT WINDOW
- ROP: 40- 60 FT/HR, WOB: 1.8 - 2.5 KLBS
Printed 7/8/2019 3:44:34PM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 6 of 13
Common Well Name. 15-27
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date 6/13/2019
End Date: 6/21/2019
X3-019FG-C. (2,422,018 00 )
Project: PBU
Site: 15
Rig Name/No.: CDR -2
Spud Daterrime: 1/20)1992 12:00:00AM
Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT ID60.35usft (above Mean Sea Level)
Date From - To Hire
Task Code NPT
Total Depth Phase
Description of Operations
11-00- (hr)
(usft)
1000 - 11:00 1.00
DRILL P
14,673.00 PROD1
DRILLER IS SEEING A 1.5 BBL INCREASE IN
PIT VOLUME
- PU OFF BOTTOM AND VERIFY NOTHING IS
BEING ADDED TO THE PITS
- DYNAMIC FLOW CHECK WELL, NOTIFY
WSUPT
- PREP TO SHUT DOWN AND FLOW CHECK
WELL THEN WE STARTED LOSING FLUID
- ZERO OUT MM AND MONITOR BOTTOMS
UPS
-- LOST 4.2 BBLS AND IN&OUTS ARE I:1
- NOW, THERE IS A FAULT MAPPED IN THIS
AREAAND COULD BE THE FAULT
- DRILLAHEAD 15' TO MAKE SURE WEARE
THROUGH IT IF ITS A FAULT
- NO CHANGE IN RATES, PU AND FINISH
CIRCULATING BOTTOMS UP
- BOTTOMS UP IS CLEAN, DISCUSS WITH
WSUPT, PUMP 20 BBLS OVER IF NO CHANGE
IN DENSITY OR RATE GO BACK TO DRILLING
11:00 - 18:00 7.00
DRILL P
14,673.00 PROD?
20 BBLS PAST BOTTOMS UP RATES AND
DENSITIES ARE GOOD, GO BACK TO
DRILLING
- DRILL 4-1/4" LATERAL FROM 14673' MD TO
14875'
- FREE SPIN: 3350 PSI, 2.77 BPM
- RATE: 2.56 BPM IN, 2.63 BPM OUT. CIRC
PRESSURE: 2970-3450 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.59 PPG OUT,
ECD: 10.2 PPG AT WINDOW
-ROP: 40-60 FT/HR, WOB: 1.4-3.1 KLBS
- PU'S ARE GETTING STICKY, LSRV RUNNING
-55k, BUMP UP TO -60K
18:00 - 20:30 2.50 DRILL P 1 14,875.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW
2030 - 2200 1.50 DRILL P
2200 0000 2.00 DRILL
P
FROM 14875' MD TO 13500' MD
- RATE: 3.74 BPM IN, 3.82 BPM OUT. CIRC
PRESSURE: 4050 PSI
-LOG DOWN FOR TIE-IN FROM 14000' TO
14026.23' MD (FORMATION) WITH +7'
CORRECTION
-TRAP PRESSURE. CLOSE EDC. LOG
ACROSS RA.
_- RUN TO BOTTOM
14,950.00 PROD? DRILL 4-1/4" LATERAL FROM 14875'MD TO
14950'
- FREE SPIN: 3460 PSI, 2.79 BPM
- RATE: 2.79 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 3460-3712 PSI
- MUD WEIGHT: 8.74 PPG IN, 8.59 PPG OUT,
ECD: 10.32 PPG
- ROP: 47 FT/HR, WOB: 2.8 KLBS
15,105.00 PROD? DRILL 4-1/4" LATERAL FROM 14950' 7015105'
- FREE SPIN: 3500 PSI, 2.79 BPM
- RATE: 2.79 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 3500- 3702 PSI
- MUD WEIGHT: 8.74 PPG IN, 8.62 PPG OUT,
ECD: 10.37 PPG
- ROP: 150 FT/HR, V408: 1.6 KLBS
- ROP RAPIDLY INCREASING. MAKING MORE
FREQUENT PICKUPS DUE TO RAPID ROP.
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depi
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 15-27
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019
End Date. 6/21/7019
Page 7 of 13
AFE No
X3-019FG-C: (2,422,018.00 )
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12.00 OOAM Rig Release: 6/24/2019
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code
NPT Total Depth
Phase
(hr)
_
Waft)
6/18/2019 00:00 - 02:00
2.00
DRILL
P
15,206.00
PROD1
0200 - 0600
4.00
DRILL
N
15,206A0
PRODt
0800 - 1000 4.00 DRILL N 15,206.00 PROD1
Printed 7/82019 344.34PM **All depths reported in Drillers Depths"
BPUOI'. USA00000945
Description of Operations
DRILL 4-1/4" LATERAL FROM 15105' TO 15206'
- FREE SPIN: 3500 PSI, 2.79 BPM
- RATE: 2.77 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 3500— 3672 PSI
- MUD WEIGHT: 8.76 PPG IN, 8.66 PPG OUT,
ECD: 10.25 PPG
- ROP: 90 FT/HR, WOB: 1.8 KLBS
DIFFERENTIALLY STUCK
- PULL TWICE ON PIPE TO 80K. VERIFY
ABILITY TO ORIENT.
-CONTINUE TO CIRCULATE WHILE GETTING
KCL AND LVT READY
- PUMP 10 BBLS KCL / 20 BBLS LVT 110 BELS
KCL
-SPOT 10 BBLS OF LVT OUT BIT. SHUT PUMP
DOWN. SOAK FOR 10 MIN.
- RIH AND PULLBACK INTO TENSION. PUMP
5 BBLS MORE OUT BIT SOAK FOR 20 MIN
- WORK PIPE. NO LUCK. PUMP REMAINDER
OF 20 BBLS OUT. LET SOAK.
-ATTEMPT ONE MORE TIME. DISCUSSWITH
ODE.
-CIRCULATE LVTAND SPACERS OUT.
- AGREE TO PUMP 40 BBLS OF LVT, WO OCN
AND ROUND TRIP MT PUP FOR 20 MORE
BBLS
KCL 8 LVT PUMPED OUT, VERIFY ORIENTOR
IS STILL FREE AND IT IS, SHUT DOWN PUMP
HOLDING 10.1 ECD
- SHUT DOWN PUMP AND ALLOW HOLE TO
RELAX WHILE HOLDING 10.0 ECD
- PU TO 86K AND HOLD, NO MOVEMENT
- SLACK OFF AND PU AGAIN TO 86K AND
HOLD, STILL NO MOVEMENT
- SLACK OFF TO 5K UNDER NEUTRAL WF SO
CREWS CAN WORK ON LINER WHILE
WAITING FOR ADDITIONAL MINERAL OIL
- 07:20 START PUMPING KCLAND 40 BBLS OF
MINERAL OIL
- PULL 75K BEFORE MINERAL OIL IS PUMPED
OUT OF THE BIT
- 08:20 10 BBLS OUT, SHUT DOWN PUMP
MAINTAINING 10.1 ECD AND ROLL THE
TOOLFACE
- 08:40 PULL TO 87K (80% OF YIELD), 2 PULLS
TO 86K WITH NO MOVEMENT
- 08:45 PUMP 5 BBLS OUT AND SOAK 10 MIN
THEN PULL 2X, REPEAT UNTIL FREE
- 15 BBLS OUT ECD AT 10.22 PPG AND WHIR
AT 474 PSI
- PUMP 5 MORE BBLS OUT
- WOB SUB IS NOW SHOWING -12K RIH AND
PU TO 85K
- SEEING GOOD WF TO THE WOB SUB
PULLED 85K WITH NO MOVEMENT SO WE
ARE STUCK BELOW THE WOB SUB
- PUMP 5 MORE BBLS OUT
-SLACK OFF AND PULLED 85K 2X
- PUMP 5 MORE BBLS OUT
North America - ALASKA - BP
Operation Summary Report
Page 8 of 13
Common Well Name: 15-27
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date. 6/21/2019
X3-019FG-C: (2,422,018.00 )
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00 00AM
Rig Release: 6/24/2019
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
10:00 - 18:00 8.00 DRILL P 15,206.00 PROD?
PULLED FREE, CIRCULATE MINERAL OILS
KCL OUT AND CHASE OOH
-ONLINE WITH PUMP MAINTAINING 10.1-10.4
ECD
- SLOWLY PULLED HEAVY UP TO 16K OVER
AT 14670, RIH IS CLEAN, PU 100' DEEPER AND
STILL SEEING THE SAME DRAG THROUGH
THE BSAD THEN CLEANED UPAFTER CTC
PULLED PAST THE MAPPED FAULT AT 14682',
DISCUSSED WITH WSUPT & ODE
- JOGGED AT THE WINDOW THEN PULLED
THROUGH, OPEN EDC AND PUMP AT MAX
RATE
- WASH ACROSS WS TRAYAND PULL UP TO
10550 PUMPING PILLS FOR THE END OF THE
TANGENT SECTION
- PULLED TO 3600' AND PUMPED LOW &
HI -VIS PILLS, BLEW DOWN THE OUT MM AND
GOT SOME CHUNKS OF CMT AND A LITTLE
METAL
'- RIH AT 100 FPM TO INCREASE AVS AND
PREP PITS TO SWAP MUD
- LOG TIE IN WITH A -24.5' CORRECTION
- RIH TO THE WINDOW AND CLOSE THE EDC
- SAT DOWN AND POPPED BY 14661'
1800 - 1930 1.50 DRILL P 15,206.00 PROD1
DRILL 4-1/4" LATERAL FROM 15206' TO 15301'
- FREE SPIN: 3500 PSI, 2.76 BPM
- RATE: 2.76 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3500- 3672 PSI
- MUD WEIGHT: 6.74 PPG IN, 8.60 PPG OUT,
ECD: 10.36 PPG
FOR 90 FT/HR, WOB: 1.8 KLBS
1930 - 2030 1.00 DRILL P 15,206.00 PROD1
PERFORM MUD SWAP.
2030 - 0000 3.50 DRILL P 15,450.00 PROD?
DRILL 4-1/4"LATERAL FROM 15206'TO 15450'
- FREE SPIN: 3213 PSI, 2.81 BPM
- RATE: 2.81 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3213- 3488 PSI
- MUD WEIGHT: 6.60 PPG IN, 8.52 PPG OUT,
ECD: 10.3 PPG
- ROP: 90- 100 FT/HR, WOB: 1.8- 2.2 KLBS
6/19/2019 0000 - 0300 3.00 DRILL P 15,503.00 PROD1
DRILL 4-1/4°LATERAL FROM 15450'-15503'
- FREE SPIN: 3213 PSI, 2.81 BPM
- RATE: 2.81 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3213 - 3488 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
ECD: 10.3 PPG
- ROP: 20-40 FT/HR, WOB: 2.2 TO 2.8 KLBS
HAVING HARD TIME STAYING ON BOTTOM.
INCREASE LUBES TO 3%
500' WIPER TRIP
0300 - 0800 5.00 DRILL P 15,503.00 PROD?
DRILL 4-1/4" LATERAL FROM 15503'
- FREE SPIN: 3265 PSI, 2.73 BPM
- RATE: 2.72 BPM IN, 2.72 BPM OUT. CIRC
PRESSURE: 3213-3527 PSI
- MUD WEIGHT: 8.63 PPG IN, 8.71 PPG OUT,
ECD: 10.3 PPG
- ROP: 2040 FT/HR, WOB: 2.2 TO 2.8 KLBS
Printed 7/8/2019 3:44:34PM ""All depths reported in Drillers Depths"
North America - ALASKA - BP Page 9 of 13
Operation Summary Report
Common Well Name: 15-27 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Dale: 6/13/2019 End Date. 6/21/2019 X3-019FG-C'. (2,422,018.00 )
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Daterrime: 1/20/1992 12:00:00AM Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Hm Task Code NPT Total Depth Phase Description of Operations
(hr) _ _ (usft)
0800 - 10:30 2.50 DRILL P 15,660.00 PROD? WIPER TRIP
10:30 - 17:15 6.75
17:15 - 18:00 0.75
DRILL P
DRILL P
- DRILLED 450', WIPER TRIP TO WINDOW
- DID NOT SEE THE DRAG WE SAW
YESTERDAY THROUGH THE BSAD
-JOG IN HOLE BELOW THE WINDOW
- REDUCE RATE TO PULL THROUGH WINDOW
- OPEN EDC AND PUMP AT MAX RATE UP TO
'TIE IN DEPTH
- LOG TIE IN
-+5' CORRECTION, RIH
-CLOSE EDC AND RIH TO CONTINUE
DRILLING
15,660.00 PROW DRILL 4-114" LATERAL
- FREE SPIN: 3420 PSI, 2.80 BPM
- RATE: 2.81 BPM IN, 2.83 BPM OUT. CIRC
PRESSURE: 1734 — 3602 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
ECD: 10.3 PPG
- ROP: 20-40 FT/HR, WOB: 1.4 TO 3.7 KLBS
- DRILLING SHALE STARTED AT 15580' TO
_ 15850'BACK IN A SAND
15,980.00 PROD1 DRILL 4-1/4" LATERAL
- FREE SPIN: 3700 PSI, 2.88 BPM
RATE: 2.68 BPM IN, 2.91 BPM OUT. CIRC
PRESSURE: 3700-3906 PSI
- MUD WEIGHT: 8.73 PPG IN, 8.65 PPG OUT,
ECD: 10.5 PPG CHOKE 100% OPEN
- ROP: 20-40 FT/HR, WOB: 2.2 TO 3.4 KLBS
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths"
KWD DRILL WITH BEARD'S CREW,
COMMENTS ON SAFETY TAB
SIGNS OF PIPE LOCKING UP TRYING TO GET
BACK TO BOTTOM.
_ _
18:00 - 00:00 6.00 DRILL P
15,980.00 PROD?
WIPER TRIP TO WINDOW.
- PULLED 15K OVER AT 14715', 14683', 14651'
WOB AND SURFACE WEIGHT ERRATIC.
-19:45 15539' STARTED PACKING OFF.
ANNULAR PRESSURE SPIKING. DISCUSS
ECD MAXIMUMS WITH ODE.
- MANIPULATE PUMP RATE AND RUN BACK IN
THE HOLE. STACKED WEIGHT AT 14626'
-MANIPULATE PUMP RATE AND BHA
POSITION TO KEEP EVERYTHING MOVING.
- CONSISTENT ECD AND NO PUMP
FLUCTUATION. PULL THROUGH WINDOW
- TRAP 10.3 PPG AT WINDOW OPEN EDC,
JET WHIPSTOCKAND CHASE OUT OF HOLE.
6/20/2019 00:00 - 01:00 1.00 DRILL P
15,980.00 PROD?
CONTINUE WIPER
-4000' PUMP 10 BBLS HIVIS SWEEP.
-CHOKE PLUGGING WHEN HIT SURFACE.
BYPASS CHOKE AND BLOW DOWN
- CEMENT CHUNK, SHALE PIECES, WINDOW
METAL.
-TURNAROUND
01:00 - 0330 2.50 DRILL P
15,980.00 PROD1
RIH
-3.77 BPM RATE IN / 4.18 BPM OUT RATE
- 8.75 PPG IN / 8.58 PPG OUT. MINIMAL
SOLIDS ON SHAKER. CONTINUE IN THE
HOLE
- PERFORMED KICK WHILE TRIPPING DRILL
WITH BUSH CREW (SEE REMARKS)
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 10 of 13
Operation Summary Report
Common Well Name: 15-27 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/13/2019 End Date'. 6/21/2019 X3-019FG-C: (2,422,018.00 )
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/time: 1/20/1992 12:00 OOAM Rig Release: 6/24/2019
Active datum: RT Q60.35usft (above Mean Sea Level)
Date From - To Him Task
(hr)
0330 - 0430 1.00 DRILL
0430 - 0630 2.00 DRILL
06:30 - 07:15 0.75
0715 - 1300 5.75
DRILL
DRILL
BPUOI: USA00000945
Code NPT Total Depth
Phase Description of Operations
_ (usft)
_
P 15,980.00
PROD? - LOG DOWN FOR TIE-IN FROM 14000' TO
14028' MD (FORMATION) WITH *5'
CORRECTION
- TRAP 10.4 ECD. CLOSE EDC
- RUN THROUGH WINDOW WITHOUT ISSUE.
- 0.55 BPM IN RATE 10.69 BPM OUT RATE
-8.67 PPG IN /8.59 PPG OUT ECD AT
WINDOW 10.33 PPG
-RUN THROUGH WINDOW. DRILLER
NOTICED PACKOFF LEAKING. INCREASED
PRESSURE. STILL LEAKING.
P 15,980.00
PROD? PULLED THROUGH WINDOW.
-NOTIFIED WSUPT/ODE
- TRAP PRESSURE. CLOSE UPPER 2-3/8"
PIPE / RAMS. CLOSE ANNULAR
-OPEN EDC, BREAK CIRCULATION
- DEVELOPED APPROVED LEVEL II OCN.
-REPLACED PACKOFF ELEMENT/
EXTRUSION RINGS.
ROLLING TEST TO 860 PSI. GOOD TEST.
P 15,980.00
_-
PROD? PACK OFF CHANGED AND TESTED
-PUH TO VERIFY SLIP MARKS ON PIPE DID
NOT CAUSE ANY DAMAGE
'- PU 117' TO SLIP MARKS AND THEY ARE OK
- CLOSE THE EDC AND RIH REDUCING PUMP
PRESSURE THROUGH ALL SHALE INTERVALS
- RIH CLEAN PAST FAULT AT 14682'
P 15,980.00
PROD1 DRILL 4-1/4" LATERAL
- FREE SPIN: 3700 PSI, 2.88 BPM
- RATE: 2.88 BPM IN, 2.91 BPM OUT. CIRC
PRESSURE: 3700-3906 PSI
- MUD WEIGHT: 8.79 PPG IN, 8.66 PPG OUT,
ECD: 10.75 PPG CHOKE 100% OPEN
- ROP: 20-90 FT/HR, WOB: 2.2 TO 3.4 KLBS
- ECD'S AT THE WINDOW ARE AT 10.76 AND IS
OUT OF THE PARAMETERS IN THE WELL
PLAN, CALL ODE AND DISCUSS
-MAX ECD'S=WINDOW 11.0 EMW AND 11.5
EMWAT THE BHA
- HAVE TO PU EVERY ONCE AND A WHILE AS
Wt STACKS
Printed 7/82019 3:44:34PM "All depths reported in Drillers Depths"'
North America - ALASKA -BP
Operation Summary Report
Common Well Name: 15-27
Event Type: RE-ENTER- ONSHORE (RON) Start Date- 6/13/2019 End Date 6/21/2019
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Daterrime: 1/20/1992 12:00:OOAM
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To His Task Code NPT Total Depth Phase
(hr) (usft)
13:00 - 18:00 5.00 DRILL P 16,350.00 PROD1
1800
- 1930
1.50
DRILL
P
16,350.00
PROW
1930
- 2230
3.00
DRILL
P
! 16,508.00
PROD1
22:30 - 00:00 1.50 DRILL P 16,508.00 PROD?
6/21/2019 00:00 - 01:30 1.50 DRILL P 16,508.00 PROD?
Printed 7/8/2019 3:44:34PM **All depths reported in Drillers Depths"
Page 11 of 13
AFE No
X3-019FG-C (2.422 018 00 )
BPUOI: USA00000945
Description of Operations
WIPER TRIP DRILLED 350'
- PREP PITS FOR MUD SWAP WHILE
TRIPPING
- PULLING HEAVY WITH THE BHAABOVE THE
WINDOW THEN PULLED THROUGH
- ONLINE AT 0.5 BPM JUST TO MOVE FLUID
- PACKED OFF ON THE BHAABOVE THE
WINDOW ECD WENT TO 11.8 PPG THEN
DROPPED OFF
- OPEN THE EDC AND PUMP AT 1.0 BPM,
ESTABLISH RETURNS THEN INCREASE RATE
AND WORK EDC DOWN TO JET OUT TO THE
WINDOW PUMPING A 10 X 10 LHVP'S
- HAD A COUPLE LIGHT SET DOWNS BELOW
THE WINDOW THE LIGHT OVER PULLSAT
THE BIT
- CALL WSUPT NEWLON AND ODE TO
DISCUSS PULLING UP TO THE BOTTOM OF
THE LONG TANGENT SECTION TO MAKE
SURE THE WELL IS CLEAN UP TO THAT
POINT
- GETTING CONSISTANT CUTTINGS ACROSS
THE SHAKER, GRABA SAMPLE TO HAVE GEO
CHECK TO SEE IF IT'S SHALE
'- SAMPLE IS SAND BUT IT'S COATED WITH
SOMETHING THAT HE IS NOT SURE OF
- LOG DOWN FOR TIE-IN FROM 14000' TO
14027' MD (FORMATION) WITH +7'
CORRECTION
RIH
- 0.47 BPM IN RATE / 0.65 BPM OUT RATE
- 8.53 PPG IN / 8.67 PPG OUT RATE.
- 14,619', 15,670, 15732
SWAP MUD
DRILL 4-1/4" LATERAL
- FREE SPIN: 3130 PSI, 2.81 BPM
- RATE: 2.81 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 3130 — 3350 PSI
- MUD WEIGHT: 8.59 PPG IN, 8.47 PPG OUT,
ECD: 10.02 PPG CHOKE 100% OPEN
- ROP: 20-90 FT/HR, WOB: 2,2 TO 2.5 KLBS
- DRILLED WELL TO A 16508' UNCORRECTED
DEPTH
CONDITION WELLBORE FOR LINER
- 3.1 BPM IN RATE / 2.99 BPM OUT RATE
-8.60 PPG IN /8.51 PPG OUT MAINTAINING
10.13 PPG AT WINDOW
- SLIGHT OVERPULL AT 14618- 14611
- PERFORM 100' JOG 14450- 14550' PRIOR TO
PULLING THROUGH WINDOW
- PULLED THROUGH WINDOW WITHOUT
ISSUE. TRAPPED PRESSURE
CONDITION WELLBORE
-OPEN EDC
- 3.94 BPM IN RATE / 4.01 BPM OUT RATE
- 8.65 PPG IN 18.50 PPG OUT
-JET WHIPSTOCK. CHASE UPHOLE TO 1312
WHILE PUMPING A BOTTOMS UP.
- LOG DOWN FOR TIE-IN FROM 14000' TO
14031.89' MD (FORMATION) WITH +2'
CORRECTION
-RIH TO WINDOW. CLOSE EDC.
North America - ALASKA - BP
Operation Summary Report
Common Well Name'. 15-27 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6113/2019 End Date: 6/21/2019 X3-019FG-C: (2.422.01800)
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/Time: 120/1992 12:00 OOAM Rig Release: 6/24/2019
Page 12 of 13
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usR (above
Mean Sea Level)
Date From - To
Hrs Task
Code NPT Total Depth
Phase Description of Operations
_(hr)
(usft)
01:30 - 02:30
1.00 DRILL
P 16,512.00
PROD? RUN TO BOTTOM TO CORRECT TO
- 0.56 BPM IN RATE / 0.67 BPM OUT RATE
- 8.59 PPG IN /8.50 PPG OUT MAINTAINING
10.3 PPG ECDAT WINDOW
- SAT DOWN 4K AND POPPED BY 15508'
- CORRECTED TD 16512'
0230 - 09.30
7.00 DRILL
P 16,512.00
PROD1 PERFORM LONG WIPER TRIP TO SWAB
FROM 16512' MD TO O' MD
- RATE: 3.12 BPM IN, 2.95 BPM OUT. CIRC
PRESSURE: 3491 PSI
-8.64 PPG IN/8.51 PPG OUT
-JOGATWINDOW. PULLTHROUGH
. WITHOUT ISSUE.
- OPEN EDC, JET TRAY WITH 15 BBLS HIVIS
SWEEP.
- TRIP TO THE SWAB CHASING 180K LSRV
PILL
- PUMPANOTHER 180K LSRV PILL FOR 4000'
- PILLAT SURFACE WITH NO INCREASE IN
CUTTINGS OR CHOKE PLUGGING ISSUES
- 150' FROM SURFACE JOG IN HOLE
- TAG UP
09:30 - 12:10
2.67 DRILL
P 16,512.00
PROD? . CONTINUE LONG WIPER
'-TAGGED UP, NO PACKING OFF ISSUES.
-ZERO DEPTHS AND RIH
- PU WT AT 9200'- 37K
- PU Wr AT 111 00' = 52KAT MIN RATE
12:10 - 12:45
0.58 DRILL
P 16,512.00
PROD1 LOST POWER TO THE MAIN SUB, WELL IS
SECURED WITH THE DRILLING CHOKE
HOLDING 448 PSI FOR MANAGED PRESSURE
DRILLING AND INCREASED RACKOFF
PRESSURE, ALL HANDS HAVE REPORTED TO
THEIR STATIONS AND ARE STANDING BY
MONITORING
- BUMP WHP UP TO MAINTAIN BETWEEN 10.1
AND 10.4 EMW AT THE WINDOW
-STILL HAVE HIGH LINE POWER, LOST
POWER TO THE MAIN SUB, SOMETHING
INTERNAL TRIPPED AND KICKED US OFFLINE _
12:45 - 14:45
2.00 DRILL
P 16,512.00
PROD1 POWER IS RESTORED, TIE IN BREAKER ON
THE PIT SIDE TRIPPED DUE TO OVER
HEATING.
- NOTIFY ON CALL WSUPT NEWLON AND
DISCUSS PLAN FORWARD
- OK TO GO BACK TO WORK
-ONLINE WITH PUMP HOLDING 10.1 EMW AT
THE WINDOW, POOH & RIH TO CHECK THE
INJECTOR FUNCTIONS
- ALL IS GOOD, RIH
LOG TIE IN
- CLOSE EDC AND DRIFT TO TD AT MIN RATE
- CORRECT DEPTH -30' AND RIH TO WINDOW
- 14627 1.79k, 14655 1.2k
Printed 7/8/2019 3:44:34PM "All depths reported in Drillers Depths'"
North America - ALASKA -BP
Operation Summary Report
Page 13 of 13
Common Well Name: 15-27
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/13/2019
End Date: 6/21/2019
X3-019FG-C: (2,422,018.00 )
Project: PBU
Site: 15
Rig Name/No.: CDR -2
Spud Date/Time: 1/20/1992 12:00:o0AM
Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Hm
Task Code NET
Total Depth Phase
Description of Operations
(hr)
(usft)_
- CLEAN TRIP OOH, PULL THROUGH THE
14:45 - 20:30 5.75
DRILL P
16.51Z00 PRODt
TAG TD ON DEPTH
Printed 7/62019 3:44:34PM **All depths reported in Drillers Depths"
- SWAP TO LINER PILLAND DYNAMIC FLOW
CHECK WELL
-GOOD DYNAMIC FLOW CHECK
�- POOH LAYING IN LINER PILL WITHOUT
BEADS TO THE WINDOW
- CLEAN TRIP OOH, PULL THROUGH THE
WINDOWAND OPEN THE EDC
-ONLINE WITH THE EP MUD LUBE PILL,
PUMP DOWN TO THE EDC THEN REDUCE
'RATE TO 2.5 BPM
- 75 BBLS UP THE BACKSIDE START THE 9.8
PPG KWF DOWN THE COIL AND PUH TO
12350'
- LET FEW BBLS OF 9.8 OUT THEN POOH
LAYING IN
- PAINT WHITE FLAG AT 11129.79' BIT DEPTH
(11050' EDP)
- PAINT YELLOW FLAG AT 9017.77' BIT DEPTH
( 8937.98' EOP)
-PULL OUT HOLE
20:30 - 22:00 1.50 DRILL
P
l 16,512.00
PROD1
MONITOR WELL FOR 10 MINUTES STATIC
- PJSM FOR LAYING DOWN BHA
LAYING DOWN BHA.
22:00 - 22:30 0.50 BOPSUR
P
16,512.00
PROD1
WEEKLY BOPE FUNCTION TEST
22:30 - 0000 1.50 RIGU
P
16,512.00
PROD1
BREAK DOWN UOC
PJSM, BOOT E -LINE. PREP TO PUMP SLACK
OUT
BEGIN PUMPING SLACK OUT
SWAPPED OVER TO CON
Printed 7/62019 3:44:34PM **All depths reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Common Well Name. 15-27
Event Type: COM- ONSHORE (CON) Start Date. 6/22/2019 End Date: 6/24/2019
AFE No
(1,337,575.00 )
Page 1 of 3
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/time: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000945
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
6/22/2019 00:00 - 05:30 5.50 RIGU P 16,512.00 RUNPRD PUMP 314' OF POSSIBLE 209' FROM FACTORY
05:30 - 17:00 11.50 RUNCOM P
1700 - 20.00 3.00 RUNCOM P
2000 - 2200'. 2.00 RUNCOM P
22:00 - 00:00 2.00 RUNCOM P
Printed 7/8/2019 3'.47:47PM "All depths reported in Drillers Depths"
OUT. SURGE MULTIPLE TIMES
CUT 20' COIL DUE FLAT SPOT IN COIL.
-MAKE UP CTC. PULL TESTED TO 50K.
PRESSURE TEST COIL CONNECTOR TO
4500#
-REPLACE PACKOFF, TEST TO 250 LOW/
3500 PSI HIGH
- MAKE UP NOZZLE. LOAD / LAUNCH 7/8"
STEEL BALL. RECOVERED 718" -STEEL BALL
16,512.00
RUNPRD PREP FLOOR TO RUN COMPLETION
'- PJSM TO MU COMPLETION
- WALK THROUGH COMPLETION WITH
DRILLER, NS FIELD SPECIAISTAND TENDEKA
REP
- MU COMPLETION AS PER APPROVED
SUMMARY
- AICD'S & SWELL PACKERS RAN, MU LINER
- HOLD KWT DRILL, SAFETY JOINT PU AND
WELL SECURED ON 53 SECONDS, ALL
HANDS CALLED IN FROM STATIONS
STANDING BY
- HOLD AAR THEN REMOVE ALL EXCESS 2-3/8
LINER FROM PIPE SHED, COUNT VERIFIED
AND SWAP OVER TO 2-7/8" HANDLING
EQUIPMENT
_
- ALL 2-7/8" RAN, SWAP TO 3-1/2"
16,512.00
RUNPRD COMPLETION RAN
- CLEAN RIG FLOOR
-PREP TO RUN UPPER BHA, CHANGE
ELEVATORS TO 2-3/8 FOR PH6
- RUN PH6 AND HANG OFF IN UPPER 2-3/8"
COMBI'S
- RUN DEPLOYMENT SLEEVE AND PH6.
WEIGHTS 40K
-STRIP DOWN OVER BHAAND MU TO
LUBRICATOR
- TAG UP LENGTH = 1,91-
16,512,00
RUNPRD RIH
- 0.17 BPM IN RATE / 0.59 BPM OUT
- 8.71 PPG IN / 9.78 PPG OUT
- RIH WEIGHTAT 7500'17K.
- PU WEIGHT AT 10,300 48K UP 16K RIH
- PU WEIGHT AT 13,600 68K UP
16,512.00
RUNPRD BREAK CIRCULATION
- ATTEMPT TO GET 2 BPM. START LOSING 0.6
BPM.
BACK RATE DOWN.
GRADUALLY WORK RATE UP TO MAINTAIN 1-1
CIRCULATED 9.8 PPG FLUID OUT OF WELL.
STOP AT YELLOW FLAG 14291.69 -14254.89 =
-36.8'
PU WEIGHT 65K RIH WEIGHT 20K AT
WINDOW
Printed 7/8/2019 3'.47:47PM "All depths reported in Drillers Depths"
Common Well Name: 15-27
Event Type: COM- ONSHORE (CON)
PBU
Rig
North America - ALASKA- BP Page 2 of 3
Operation Summary Report
AFE No
Start Date6/22/2019 Eno Date. 6/24/2019 X3-019FG-C: (1,337,575.00 )
Site: 15
Active datum: RT @60.35usft (above Mean Sea Level)
Date From - To Hire Task
(hr)
6/23/2019 00:00 - 0300 3.00 RUNCOM
BPUOI: USA00000945
Code NPT Total Depth Phase Description of Operations
(usft)
P 16,512.00 RUNPRD RUN LINER INTO OPEN HOLE
03:00 - 07:00 4.00 RUNCOM P
07:00 - 11:30 4.50 RUNCOM P
- SET DOWN 15696',15776'.
- HAD TO WORK ITAT 15952' COUPLE TIMES.
KEEP COMING UNLATCHED FROM LINER.
�- FRICTION IN LINER IS ENOUGH TO PUMP G
SPEAR OFF
- CONTINUALLY HAVING TO WORK LINER.
WITHOUT PUMPS IS WORKING THE BEST.
- WORKING LINER BY PUMPING FOR SHORT
PERIODS AND RUNNING IN HOLE WITH PUMP
OFF
TD FLAG ON DEPTH AS WE WENT BY.
- WORKED DOWN TO 16464'. BREAK
CIRCULATION. PU WEIGHTS 9ETWEEN75-
85K WITHOUT PUMPS
- DISCUSSED WITH ODE. PUMP MINERAL OIL
16,512.00 RUNPRD PUMP 10 BBLS KCL 120 BBLS LVT / 10 KCL
'PUMP LVT OUT. ATTEMPT TWICE TO PULL
OFF BOTTOM. 87K PULL.
ATTEMPT BRINGING WELLHEAD PRESSURE
UP TO 500 PSI. NO LUCK.
- CIRC OUT LVT AND WAIT FOR RES DEV TO
REVIEW LINER SUMMARY BASED ON THIS
DEPTH.
GOTAPPROVAL TO LEAVE LINER WHERE IT
IS IF WE CAN'T GET ITANY DEEPER ONCE
THE LVT IS OUT
- LVT OUT, TRY WORKING DOWN ONLY, IF
NOTABLE TO GETANY MOVEMENT DOWN
WE ARE DONE
16,512.00 RUNPRD POOH
- CORRECT DEPTH TO GS
-POOH FOLLOWING PRESSURE SCHEDULE
- PUMP 55 BBLS OF FRESHWATER INTO REEL
FOR SLACK MANAGEMENT
- BLEED OFF PRESSURE AND FLOW CHECK
WELL
Printed 7/8/2019 3:47:47PM **All depths reported in Drillers Depths—
Common Well Name. 15-27
Event Type: COM- ONSHORE (CON)
North America - ALASKA - BP Page 3 of 3
Operation Summary Report
Start Date: 6/22/2019 End Date'. 6124/2019
AFE No
K3-019FG-C: (1,337,575.00 )
Project: PBU Site: 15
Rig Name/No.: CDR -2 Spud Date/Time: 1/20/1992 12:00:OOAM Rig Release: 6/24/2019
Active datum: RT @60.35usft (above Mean Sea I
Date From - To Him
(hr)
11:30 - 1930 8.00
1930 - 00:00 4.50
Task Code NPT
RUNCOM P
RUNCOM P
6/24/2019 00:00 - 01:30 1.50 RUNCOM P
01:30 - 0830 7.00
RIGD P
Total Depth
Phase Description of Operations
(usft)
16,512.00
RUNPRD LD BHAAND PERFORM SLACK MANAGEMENT
- GOOD NO FLOW, PU INJECTOR AND LD THE
LINER RUNNING TOOLS
- STAB INJECTOR, CLOSE MASTER VALVE
- FLUSH MPD LINE WITH FRESH WATER
- PUMP SLACK BACK, CLOSE SWAB & LTT
M&S VALVES
- REMOVE INJECTOR, INSTALL NIGHT CAP
AND TEST
-OPEN SWAB AND BLOW DOWN MPD LINE
- CLOSE TANGO VALVES
-OPEN MASTER VALVE AND FLOW CHECK
WELL
- GOOD NO FLOW, REMOVE INJECTOR AND
RU PIPE CUTTER
- CUT 340' OF COIL FOR 2% SLACK, RD
CUTTER
- MU CTC, PULL TEST TO 50KAND PT TO 4K
- MU STINGER AND NOZZLE, CLOSE MASTER
AND PUMP SLACK FORWARD
- PT LUBRICATOR CONNECTION
- HEAD UP BHI LOC. TEST UQC. GOOD TEST
'- MAKE UP BHA DOWN TO DBPV, TEST TO
3500#. GOOD TEST
- MAKE UP SEAL STINGER.
- TEST QTS TO 3500#.
16,512.00
RUNPRD RIH WITH SEAL STINGER ASSEMBLY BHA #4
- RATE: 0.57 BPM IN, 1.05 BPM OUT. CIRC
PRESSURE' 1088 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.62 PPG OUT
- RIH WEIGHT 21 K / PU WEIGHT 50K AT 11240'
-TAG AND SEE PRESSURE INCREASE AT
11365'. PRESSURE UP TO 2600#. BALL SEAT
SHEARED.
-BREAK CIRCULATION. 2.02 BPM IN /1.97
BPM.
- ONLINE WITH DIESEL. 1.98 BPM 12,01 BPM
-PUMP DIESEL AROUND LINER, POOH
LAYING IN DIESEL. HOLDING 450 PSI ON
WELLHEAD
16,512.00
RUNPRD POOH
- 1.70 BPM IN RATE / 1.20 BPM OUT RATE
-6.8 PPG IN /8.6 PPG
-TAG UP AND TRAP 450# ON WELLBORE.
-VALVE CREW GREASED AND CLOSED BOTH
SWAB AND MASTER VALVE
-PERFORM LTT BETWEEN MASTER AND
SWAB 7O 3500#. GOOD TEST
- OPEN CHOKE TO TIGER TANK. CIRCULATE
REMAINING DIESEL OUT OF REEL
-JET STACK WITH FRESHWATER. BLOW
DOWN STACK
16,512.00
POST RIG DOWN AND MOVE OFF
- REMOVING FLUID FROM PITS
- TRUCKS ON LOCATION TO MOVE OFF WELL
-BOP'S ND, NU TREE CAPAND TEST
"'RIG RELEASED AT 08:30"'
Printed 7/8/2019 3.47.47PM **All depths reported in Drillers Depths"
Daily Report of Well Operations
15-27B
ACTIVITYDATF SUMMARY
T/1/0=500/0/0 POST CDR2. Evacuated fluid down to taret 90. RID test spool #2 &
installed tree cap. Torqued treecap to 886 ft lbs. R/U CIW lubricator #839 with H plug & tool.
PT'd lubricator low 300psi, High 3500psi. Set 4" H TWC #440 @ 110". Performed LTT on
TWC. RID CIW lubricator. Evacuated fluid down to MV gate. RID CDR2 Target 90 #3. RID
CDR2 tree #6. Installed production tree. Torqued MVx THA to 553 ft lbs. Torqued MV x SSV
to 886 ft lbs. Installed Tapped blind on WV & torqued to 886 ft lbs. Modify & install Scaffold
6/24/2019
kit. *** Job in Progress*** Continued on day shift.
T/I/O = TWC/0/0. (Test and Pull). PT'd against TWC 350/5000 PSI (Pass) Charted and
Retained. Pulled 4" TWC #440 @130" w/ Lubricator 839. RDMO. ***Job Complete***.
6/25/2019
FWPs = 420/0/0.
CTU #8 1.5" 0.109 WT.
Objective: Drift/RPM
MIRU. Load well with 208 bbis 1% slick KCL w/ safelube. MU & RIH w/ 1.80" DJN drift.
7/20/2019
***Job Continued on 7/21/19 WSR***
CTU #8 1.5" 0.109 WT.
Objective: Drift/RPM
Continue RIH w/ 1.80" DJN drift. Tag TD at 16455' CTM. Lay in 1% slick KCL w/ safelube in
linerwhile POOH. RIH w/ Baker Atlas RPM. Log from bottom at 16,449' (CTM) to 11,150'.
Log repeat pass from 12,350'- 12,050'. POOH. Pump 38 bbl 50/50 freeze protect.
7/21/2019
***Job Continued on 7/22/19 WSR***
CTU #8 1.5" 0.109 WT.
Objective: Drift/RPM
Finish POOH. RDMO.
7/22/2019
***Job Complete***
by
North America - ALASKA - BP
PBU
15
15-27
15-27B
500292224302
Design: 15-27B
Final Survey Report
21 June, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Site:
15
Well:
15-27
Wellbore:
15-278
Design:
15-278
BP
Final Survey Report
Local Coordinate Reference:
Well 15-27
TVD Reference:
RT @ 60.35usft (15-27A)
MD Reference:
RT @ 60.35usft (15-27A)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27. OGP-Use AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
15, TR -11-14
Declination
Site Position:
Northing:
From:
Map
Easting:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
15-27,15-27
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore 15-27B
5,958,837.360 usft
676,296.980 usft
0.000 in
5,961,157.180 usft
675,967.790 usft
33.99 usft
Magnetics
Model Name Sample Date
Declination
Dip Angle
BGGM2018 7/1/2019
16.82 80.93
Design
15-27B
Audit Notes:
Version:
1 0 Phase:
ACTUAL
Tie On Depth:
Vertical Section:
Depth From (TVD)
+N/S
+El -W
(usft)
(usft)
(usft)
26.36
0.00
0.00
Latitude: 70° 17'35.236 N
Longitude: 148° 34'21,213 W
Grid Convergence: 1.34 °
Field Strength
(nT)
57,419
14,371.90
Direction
(°)
340.00
Latitude: 70" 17' 58.123 N
Longitude: 148° 34'29Z22 W
Ground Level: 32.21 usft
62112019 11:23:20AM Page 2 COMPASS 5000.1 Build 81D
M*
BP
Final Survey Report
Company: North America - ALASKA - BP
Inc
Local Coordinate Reference:
Well 15-27
Project: PBU
WS
WIN
TVD Reference:
RT @ 60.35usft (15-27A)
Site: 15
(usft)
(°)
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
(usft)
(usft)
North Reference:
True
Wellbore: 15-27B
26.36
0.00
Survey Calculation Method:
Minimum Curvature
Design: 15-27B
0.00
0.00
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program
Date 6/21/2019
0.90
186.30
431.33
From
To
-0.35
5,961,154.011
675,967.515
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
930.29
431.35
3,440.3515-27 Srvy1 MWD (15-27)
MWD
MWD -Standard
675,969.675
3,705.00
4,213.00 15.27APB1 Srvy 1 GVD GC SS (15-27AP
GVD-GC-SS
Gyrodata gyro single shots
1,430.24
4,307.01
11,405.1715-27APB1 Srvy 2 MWD+IFR+MS(15-27A
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
675,975.947
11,445.70
11,898.41 15-27APB1 Sivy 3 MWD+IFR+MS(15-27A
MWD+IFR+MS-WOCA
MWD + FIR +Multi Station W/O Crustal
1,939.12
11,926.82
14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
675,985.664
14,403.00
16,512.00 Survey#1(15-27B)
MWD
MWD -Standard
2,433.99
Survey
MD
Inc
An
TVD
TVDSS
WS
WIN
Northing
Eluding
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
26.36
0.00
0.00
26.36
-33.99
0.00
0.00
5,961,157.180
675,967.790
0.00
431.35
0.90
186.30
431.33
370.98
-3.16
-0.35
5,961,154.011
675,967.515
0.22
930.35
0.80
135.50
930.29
869.94
-9.54
1.66
5,961,147.681
675,969.675
0.15
1,430.35
0.87
84.33
1,430.24
1,369.89
-11.66
7.89
5,961,145.712
675,975.947
0.14
1,939.35
1.58
58.30
1,939.12
1,878.77
-7.59
17.70
5,961,150.010
675,985.664
0.17
2,434.35
1.28
112.80
2,433.99
2,373.64
-6.14
28.61
5,961,151.709
675,996.530
0.27
2,942.35
1.10
119.00
2,941.88
2,881.53
-10.71
38.10
5,961,147.370
676,006.129
0.04
3,440.35
0.85
180.50
3,439.82
3,379.47
-16.72
42.25
5,961,141.457
676,010.417
0.20
3,705.00
0.81
145.57
3,704.44
3,644.09
-20.22
43.29
5,961,137.977
676,011.539
0.19
3,800.00
0.78
156.02
3,799.43
3,739.08
-21.37
43.93
5,961,136.848
676,012.208
0.16
3,810.00
1.67
175.52
3,809.43
3,749.08
-21.58
43.97
5,961,136.641
676,012.252
9.70
3,827.00
1.81
184.77
3,826.42
3,766.07
-22.09
43.97
5,961,136.127
676,012.261
1.84
3,631.00
2.14
187.03
3,830.42
3,770.07
-22.23
43.95
5,961,135.990
676,012.250
8.48
3,894.00
0.27
48.65
3,893.41
3,833.06
-23.30
43.92
5,961,134.920
676,012.243
3.73
3,925.00
0.88
214.81
3,924.41
3,864.06
-23.44
43.84
5,961,134.770
676,012.166
3.69
3,958.00
1.66
210.54
3,957.40
3,897.05
-24.06
43.45
5,961,134.141
676,011.794
2.38
3,988.00
243
170.60
3,987.38
3,927.03
-25.07
43.34
5,961,133.137
676,011.698
5.22
4,019.00
2.37
112.44
4,018.36
3,958.01
-25.96
44.03
5,961,132.260
676,012.416
7.55
V. Sec
(usft)
0.00
-2.85
-9.53
-13.65
-13.18
-15.56
-23.09 -
-30.16
-33.81
-35.11
-35.31
-35.80
-35.92
-36.91
-37.03
-37.48
-38.38
-39.45
6212019 11:23:20AM Page 3 COMPASS 5000.1 Build 81D
502
BP
Final Survey Report
Company.
North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project
PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Well:
15-27
North Reference:
True
Wellbore:
15-278
Survey Calculation Method:
Minimum Curvature
Design:
15-27B
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
HIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(')
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100u8ft)
(usft)
4,052.00
1.50
74.39
4,051.34
3,990.99
-26.10
45.08
5,961,132.140
676,013.466
4.56
-39.95
4,082.00
2.26
5.57
4,081.33
4,020.96
-25.41
45.52
5,961,132.844
676,013.885
7.38
-3944
4,120.00
5.11
355.03
4,119.25
4,058.90
-22.98
45.44
5,961,135.274
676,013.754
7.68
-37.13
4,213.00
8.69
25.39
4,211.58
4,151.23
-12.50
48.10
5,961,145.812
676,016.163
5.37
-28.19
4,307.01
14.04
21.27
4,303.72
4,243.37
4.56
55.28
5,961,163.030
676,022.949
5.75
-14.63
4,332.13
15.71
16.14
4,328.00
4,267.65
10.66
57.34
5,961,169.183
676,024.856
8.46
-9.59
4,425.63
23.88
11.71
4,415.90
4,355.55
41.41
64.71
5,961,200.090
676,031.507
8.88
16.78
4,518.94
28.92
9.22
4,499.46
4,439.11
82.20
72.16
5,961,241.043
676,038.002
5.53
52.56
4,611.72
33.63
5.71
4,578.74
4,518.39
129.94
78.32
5,961,288.910
676,043.037
5.44
95.32
4,706.48
35.63
9.84
4,656.72
4,596.37
183.26
85.65
5,961,342.382
676,049.115
3.25
142.91
4,801.20
38.20
8.85
4,732.44
4,672.09
239.39
94.87
5,961,398.711
676,057.020
2.78
192.51
4,895.19
40.41
8.93
4,805.17
4,744.82
298.21
104.07
5,961457.725
676,064.841
2.35
244.63
4,989.47
45.44
6.66
4,874.19
4,813.64
361.60
112.71
5,961,521.501
676,071.994
5.56
301.43
5,083.77
49.03
6.98
4,938.20
4,877.85
430.53
120.94
5,961,590.398
676,078.607
3.82
363.20
5,177.72
53.97
6.64
4,996.67
4,936.32
503.52
129.65
5,961,663.562
676,085.604
5.27
428.81
5,272.11
58.18
7.17
5,049.34
4,988.99
581.25
139.07
5,961,741.491
676,093.203
4.48
498.63
5,366.05
62.61
5.32
5,095.74
5,035.39
662.42
147.92
5,961,822.841
676,100.153
5.02
571.88
5,459.43
65.64
4.13
5,136.49
5,076.14
746.14
154.83
5,961,906.695
676,105.099
3.44
648.19
5,553.83
68.50
2.88
5,173.26
5,112.91
832.91
160.14
5,961,993.558
676,108.369
3.27
727.91
5,647.48
67.26
1.70
5,208.53
5,148.18
919.59
163.61
5,962,080.294
676,109.809
1.77
808.18
5,741.62
66.52
1.52
5,245.48
5,185.13
1,006.15
166.04
5,962,166.872
676,110.214
0.81
888.68
5,836.48
65.88
1.03
5,283.76
5,223.41
1,092.92
167.97
5,962,253.659
676,110.114
0.82
969.56
5,928.88
65.28
358.54
5,321.96
5,261.61
1,177.04
167.66
5,962,337.747
676,107.833
2.54
1,048.71
6,023.05
66.01
357.44
5,360.80
5,300.45
1,262.77
164.65
5,962,423.382
676,102.815
1.32
1,130.31
6,116.98
65.01
359.90
5,399.74
5,339.39
1,348.22
162.66
5,962,508.753
676,098.824
2.61
1,211.28
6,211.08
65.46
359.27
5,439.16
5,378.81
1,433.66
162.04
5,962,594.152
676,096.204
0.77
1,291.78
6,305.65
63.52
0.77
5,479.89
5,419.54
1,519.01
162.06
5,962,679.467
676,094.226
2.50
1,371.97
62112019 11:23:20AM Page 4 COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company: North America
- ALASKA - BP
Local Co-ordinate Reference:
Well 15-27
Project: PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site: 15
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-27B
Survey Calculation Method:
Minimum Curvature
Design: 15-27B
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azl
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft) N
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(ud) (.1100usft)
(usft)
6,398.89
62.40
0.78
5,522.27
5461.92
1,602.05
153.18
5,962,762.504
678,093.404
1.20
1,449.62
6,493.56
62.89
3.02
5,565.76
5,505.43
1,686.08
165.97
5,962,846.570
676,094.227
2.16
1,527.63
6,587.39
62.73
5,49
5,608.66
5,548.31
1,769.30
172.17
5,962,929.909
676,098.467
2.35
1,603.71
6,681.24
63.70
4.36
5,650.95
5,590.60
1,852.77
179.35
5,963,013.518
676,103.699
1.49
1,679.69
6,775.21
63.41
5.44
5,692.80
5,63245
1,936.59
186.54
5,963,097.485
676,108.919
1.07
1,756.00
6,869.53
64.05
5.19
5,734.55
5,674.20
2,020.81
194.37
5,963,181.855
676,114.778
0.72
1,83246
6,964.41
62.86
845
5,776.95
5,716.60
2,105.25
202.98
5,963,266.464
676,121.400
1.73
1,908.86
7,058.03
63.41
6.02
5,819.26
5,758.91
2,188.27
212.04
5,963,349.670
676,128.522
0.72
1,983.77
7,152.03
64.95
5.91
5,860.20
5,799.85
2,272.42
220.84
5,963,434.003
676,135.341
1.64
2,059.85
7,246.21
64.29
6.34
5,900.56
5,840.21
2,357.03
229.92
5,963,518.790
676,142.435
0.81
2,136.24
7,339.83
64.22
6.19
5,941.23
5,880.88
2,440.85
239.12
5,963,602.801
676,149.672
0.16
2,211.86
7,434.46
64.95
5.45
5,981.84
5,921.49
2,525.88
247.78
5,963,688.005
676,156.343
1.05
2,288.80
7,528.69
65.59
4.62
6,021.26
5,960.91
2,611.14
255.29
5,963,773.408
676,161.854
1.05
2,366.35
7,622.63
66.15
5.28
6,059.67
5,999.32
2,696.55
262.69
5,963,858.963
676,167.250
0.88
2,444.08
7,716.33
64.12
4.94
6,099.06
6,038.71
2,781.22
270.27
5,963,943.783
676,172.838
2.19
2,521.05
7,810.04
63.41
5.41
6,140.49
6,080.14
2,864.93
277.85
5,964,027.646
676,178.456
0.88
2,597.13
7,904.29
64.36
4.62
6,181.98
6,121.63
2,949.23
285.24
5,964,112.093
676,183.875
1.26
2,673.81
7,998.24
65.07
4.43
6,222.10
6,161.75
3,033.92
291.94
5,964,196.905
676,188.591
0.78
2,751.10
8,092.62
66.02
3.54
6,261.18
6,200.83
3,119.62
297.91
5,964,282.719
676,192.550
1.32
2,829.59
8,185.97
64.87
3.89
6,299.97
6,239.62
3,204.35
303.41
5,964,367.547
676,196.065
1.28
2,907.33
8,279.30
62.95
4.11
5,341.01
6,280.66
3,287.96
309.26
5,964,451.267
676,199.950
2.07
2,983.90
8,373.92
63.50
4.09
6,383.64
6,323.29
3,372.22
315.30
5,964,535.639
676,204.015
0.58
3,061.01
8,467.93
63.93
3.57
6,425.27
6,364.92
3,456.32
320.93
5,964,619.843
676,207.673
0.67
3,138.12
8,561.83
64.67
3.37
6,465.99
6,405.64
3,540.78
326.05
5,964,704.389
676,210.815
0.81
3,215.73
8,655.73
62.91
5.76
6,507.46
6,447.11
3,624.74
332.74
5,964,788.485
676,215.537
2.95
3,292.34
8,749.74
62.05
4.62
6,550.90
6,490.55
3,707.77
340.28
5,964,871.661
676,221.135
1.41
3,367.78
8,844.09
63.78
5.32
6,593.86
6,533.51
3,791.45
347.56
5,964,955.486
676,226.454
1.95
3,443.93
6212019 11:23:26AM
Page 5
COMPASS
5000.1 Build BID
BP
by Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project: PBU
ND Reference:
RT @? 60.35usft (15-27A)
Site: 15
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-27B
Survey Calculation Method:
Minimum Curvature
Design: 15-27B
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Asi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft) P)
(')
(usR)
(usf)
(usR)
(usR)
(usR)
(usft) ('1100usft)
(usR)
8,938.08
66.75
5,04
6,633.18
6,572.83
3,876.46
355.27
5,965,040.646
676,232.165
3.17
3,521.17
9,032.88
66.82
4.88
6,670.55
6,610.20
3,963.26
362.80
5,965,127.591
676,237.663
0.17
3,600.16
9,126.64
66.16
6.25
6,707.95
6,647.60
4,048.83
371.13
5,965,213.326
676,243.991
1.51
3,677.72
9,220.47
64.88
6.40
6,746.83
6,686.48
4,133.70
380.54
5,955,298.392
676,251.407
1.37
3,754.26
9,315.73
6447
5.42
6,787.58
6,727.23
4,219.35
38941
5,965,384.216
676,258.266
1.02
3,831.70
9,409.35
64.48
5.29
6,827.92
6,767.57
4,303.46
397.29
5,965,468.486
676,264.178
0.13
3,908.05
9,503.33
64.62
4.92
6,868.31
6,807.96
4,387.99
404.84
5,965,553.157
676,269.747
0.39
3,984.89
9,597.68
64.78
5.17
6,908.63
6,848.28
4,472.95
412.34
5,965,638.274
676,275.256
0.29
4,062.17
9,691.72
64.75
5.73
6,948.72
6,888.37
4,557.64
420.42
5,965,723.115
676,281.350
0.54
4,138.98
9,786.60
65.02
5.48
6,988.99
6,928.64
4,643.13
428.81
5,965,808.781
676,287.735
0.37
4,216.46
9,879.34
63.61
6.92
7,029.19
6,968.84
4,726.22
437.83
5,965,892.047
676,294.806
2.07
4,291.44
9,973.49
59.85
9.12
7,073.78
7,013.43
4,808.31
449.37
5,965,974.381
676,304.418
4.49
4,364.64
10,066.93
55.90
10.62
7,123.46
7,063.11
4,886.26
462.91
5,966,052.619
676,316.127
4.44
4,433.25
10,161.82
52.30
12.66
7,179.09
7,118.74
4,961.53
478.39
5,966,128,227
676,329.834
4.17
4,498.69
10,255.91
48.33
14.71
7,239.17
7,178.82
5,031.87
495.47
5,966,198.944
676,345.270
4.54
4,558.95
10,348.99
46.30
17.36
7,302.28
7,241.93
5,097.62
514.35
5,966,265.116
676,362.595
3.02
4,614.2e
10,442.94
43.87
20.63
7,368.61
7,308.26
5,160.52
535.95
5,966,328.500
676,382.724
3.57
4,666.00
10,536.49
40.25
21.99
7,438.06
7,377.71
5,218.90
558.70
5,966,387.395
676,404.095
3.99
4,713.081
10,639.30
37.32
23.46
7,518.19
7,457.84
5,278.30
583.55
5,966,447.358
676,427.546
2.99
4,760.40
10,732.32
32.66
31.07
7,594.42
7,534.07
5,325.72
607.75
5,966,495.322
676,450.631
6.86
4,796.67
10,825.48
30.03
30.29
7,673.97
7,613.62
5,367.38
632.49
5,966,537.555
676,474.382
2.86
4,827.37
10,919.53
31.48
33.40
7,754.80
7,694.45
5,408.21
657.88
5,966,578.962
676,498.808
2.29
4,857.05
11,015.17
33.77
36.12
7,835.35
7,775.00
5,450.54
687.30
5,966,621.964
676,527.228
2.84
4,886.76
11,108.57
34.11
36.30
7,912.83
7,852.48
5,492.61
718.11
5,966,664.746
676,557.039
0.38
4,915.76
11,175.14
34.08
36.56
7,967.96
7,907.61
5,522.64
740.27
5,966,695.280
676,578.488
0.22
4,936.40
11,268.17
34.36
36.94
8,044.89
7,984.54
5,564.56
771.57
5,966,737.917
676,608.799
0.38
4,965.08
11,363.14
34.97
40.04
8,123.00
8,062.65
5,606.82
805.19
5,966,780.951
676,641.416
1.96
4,993.29
6/21/2019 11:23:20AM
Page 6
COMPASS
5000.1 Build 81D
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project: PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site: 15
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-278
Survey Calculation Method:
Minimum Curvature
Design: 15-27B
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
MD Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Basting OLsg
V. Sec
(usft) (°)
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (wousft)
(usft)
11,405.17
35.04
41.10
6,157.43
8,097.08
5,625.13
820.87
5,966,799.626
676,656.663
1.46
5,005.14
11,445.70
35.17
38.79
8,190.59
8,130.24
5,643.00
835.83
5,966,817.837
676,671.201
3.29
5,016.81
11,491.14
29.19
36.51
8,229.03
8,168.68
5,662.12
850.64
5,966,837.302
676,685.553
13.43
5,029.72
11,522.65
28.82
35.60
8,256.59
8,196.24
5,674.47
859.63
5,966,849.859
576,694.254
1.83
5,038.25
11,553.56
28.45
35.48
8,283.72
8,223.37
5,686.53
868.24
5,966,862.110
676,702.579
1.21
5,046.63
11,584.37
26.86
33.70
8,311.01
8,250.66
5,698.30
876.36
5,966,874.064
676,710.423
5.82
5,054.91
11,616.11
26.76
34.88
8,339.34
8,278.99
5,710.12
884.43
5,966,886.076
676,718.208
1.71
5,063.27
11,647.64
27.75
36.04
8,367.37
8,307.02
5,721.88
892.80
5,966,898.027
676,726.308
3.56
5,071.45
11,679.16
32.31
37.60
8,394.65
8,334.30
5,734.50
902.27
5,966,910.859
676,735.471
14.68
5,080.07
11,710.49
36.62
38.31
8,420.48
8,360.13
5,748.47
913.17
5,966,925.082
676,746.047
13.82
5,089.47
11,741.80
38.80
37.69
8,445.24
8,384.89
5,763.56
924.96
5,966,940.445
676,757.478
7.07
5,099.62
11,773.31
41.35
38.33
8,469.35
8,409.00
5,779.54
937.45
5,966,956.712
676,769.592
8.20
5,110.36
11,805.05
42.45
35.71
8,492.98
8,432.83
5,798.46
950.21
5,966,973.929
676,781.948
6.51
5,121,90
11,835.87
45.30
37.68
8,515.20
8,454.85
5,813.58
962.98
5,966,991.341
676,794.312
10.25
5,133.62
11,866.75
48.19
39.80
8,536.35
8,476.00
5,831.12
977.06
5,967,009.197
676,807.975
10.61
5,145.28
11,898.41
50.92
41.01
8,556.89
8,496.54
5,849.46
992.68
5,967,027.898
676,823.160
9.10
5,157.18
11,926.82
53.15
38.77
8,574.37
8,514.02
5,866.64
1,007.03
5,967,045.415
676,837.109
10.01
5,168.42
11,957.25
49.76
37.64
8,593.33
8,532.98
5,885.34
1,021.76
5,967,064.449
676,851.388
11.51
5,180.95
11,989.20
49.50
34.06
8,614.03
8,553.68
5,905.06
1,036.01
5,967,084.500
676,865.174
8.57
5,194.61
12,020.78
53.51
32,40
8,633.68
8,573.33
5,925.74
1,049.54
5,967,105.484
676,878.218
13.35
5,209.41
12,052.23
57.20
30.07
8,651.56
8,591.21
5,947.86
1,062.94
5,967,127.914
676,891.099
13.22
5,225.61
12,083.28
61.03
28.83
8,667.49
8,607.14
5,971.06
1,076.04
5,967,151.414
676,903.645
12.80
5,242.94
12,114.48
65.52
28.11
8,681.52
8,621.17
5,995.55
1,089.32
5,967,176.209
676,916.344
14.54
5,261.41
12,145.31
69.54
25.94
8,693.30
8,632.95
6,020.93
1,102.25
5,967,201.878
676,928.680
14.57
5,280.83
12,176.80
70.48
25.69
8,704.07
8,643.72
6,047.57
1,115.14
5,967,228.810
676,940.938
3.08
5,301.46
12,208.49
73.14
25.61
8,713.96
8,653.61
6,074.71
1,128.17
5,967,256.243
676,953.329
8.40
5,322.50
12,239.26
76.41
24.98
8,722.04
8,661.69
6,101.55
1,140.85
5,967,283.371
676,965.379
10.81
5,343.36
6/212019 11:23:20AM
Page 7
COMPASS
5000.1 Build 81D
BP
by Final Survey Report
Company: North America
-ALASKA - BP
Local Coordinate
Reference:
Well 15-27
Project: PBU
TVD Reference:
RT 60.35usft (15-27A)
Site: 15
MD Reference:
RT 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-278
Survey Calculation Method:
Minimum Curvature
Design: 15-270
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
12,270.55
79.78
23.25
8,728.49
8,668.14
6,129.49
1,153.35
5,967,311.595
676,977.225
12.05
5,365.3E
12,301.53
84.81
22.44
8,732.65
8,672.30
6,157.77
1,165.27
5,967,340.148
676,988.473
16.44
5,387.87
12,333.41
89.00
23.26
8,734.37
8,674.02
6,187.10
1,177.63
5,967,369.756
677,000.141
13.39
5,411.20
12,364.85
91.88
22.29
8,734.13
8,673.78
6,216.08
1,189.80
5,967,399.015
677,011.627
9.67
5,434.27
12,398.02
93.28
21.99
8,732.72
8,672.37
6,244.92
1,201.53
5,967,428.122
677,022.683
4.59
5,457.36
12,427.56
93.80
22.15
8,730.78
8,670.43
6,274.10
1,213.36
5,967,457.562
677,033.824
1.72
5,480.73
12,458.99
94.38
22.64
8,728.53
8,668.18
6,303.08
1,225.30
5,967,486.817
677,045.085
2.41
5,503.88
12,490.31
94.93
22.05
8,725.99
8,665.64
6,331.96
1,237.17
5,967,515.958
677,056.273
2.57
5,526.95
12,521.41
95.93
19.68
8,723.05
8,662.70
6,360.88
1,248.20
5,967,545.134
677,066.618
8.24
5,550.37
12,554.46
94.73
18.88
8,719.98
8,659.63
6,391.94
1,259.06
5,967,576.438
677,076.752
4.36
5,575.84
12,585.07
92.43
18.36
8,718.07
8,657.72
6,420.89
1,268.82
5,967,605.606
677,085.825
7.70
5,599.70
12,615.87
91.95
18.08
8,716.89
8,656.54
6,450.13
1,278.44
5,967,635.056
677,094.760
1.80
5,623.88
12,647.52
92.19
16.42
8,715.75
8,655.40
6,480.33
1,287.82
5,967,665.471
677,103.428
5.30
5,649.06
12,679.48
92.29
15.21
8,714.50
8,654.15
6,511.06
1,296.52
5,967,696.390
677,111.409
3.80
5,674.96
12,710.70
92.94
13.33
8,713.07
8,652.72
6,541.28
1,304.21
5,967,726.784
677,118.386
6.37
5,700.73
12,742.62
94.63
12.15
8,710.97
8,650.62
6,572.35
1,311.23
5,967,758.002
677,124.680
6.45
5,727.52
12,773.54
95.14
11.93
8,708.33
8,647.98
6,602.48
1,317.66
5,967,788.272
677,130.399
1.80
5,753.63
12,803.94
95.55
11.91
8,705.50
8,645.15
6,632.09
1,323.91
5,967,818.024
677,135.955
1.35
5,779.32
12,836.84
94.87
12.84
8,702.51
8,642.16
6,664.09
1,330.93
5,967,850.180
677,142.225
3.49
5,806.99
12,867.85
93.46
13.03
8,700.26
8,639.91
6,694.24
1,337.86
5,967,880.474
677,148.440
4.59
5,832.95
12,897.87
93.73
13.17
8,698.38
8,638.03
6,723.42
1,344.65
5,967,909.804
677,154.545
1.01
5,858.05
12,929.68
94.04
13.27
8,696.22
8,635.87
6,754.31
1,351.90
5,967,940.860
677,161.077
1.02
5,884.60
12,961.82
91.74
12.83
8,694.60
8,834.25
6,785.58
1,359.15
5,967,972.287
677,167.589
7.29
5,911.50
12,993.26
89.58
11.22
8,694.24
8,633.89
6,816.33
1,365.70
5,968,003.175
677,173.416
8.57
5,938.15
13,025.27
90.09
10.60
8,694.33
8,633.98
6,847.76
1,371.76
5,968,034.737
677,178.737
2.51
5,965.62
13,054.59
91.74
7.80
8,693.87
8,633.52
6,876.69
1,376.45
5,968,063.772
677,182.744
11.08
5,991.21
13,086.62
92.67
7.53
8,692.63
8,632.28
6,908.41
1,380.71
5,968,095.581
677,186.269
3.02
6,019.55
621/2019 11:23:20AM
Page 8
COMPASS
5000.1 Build 81D
50
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coareinate
Reference:
Well 15-27
Project: PBU
TVD Reference:
RT @ 60.35usft (15�27A)
Site: 15
MD Reference:
RT Q 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-278
Survey Calculation
Method:
Minimum Curvature
Design: 15-276
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
An
TVD
TVDSS
NIS
E/W
Northing
Easting DLsg
V. Sec
(usft) (')
O
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°HOOusft)
(usft)
13,118.10
92.80
6.93
8,691.13
8,630.78
6,939.61
1,384.67
5,968,126.858
877,189.495
1.95
6,047.51
13,148.94
91.88
3.36
8,689.87
8,629.52
6,970.29
1,387.43
5,968,157.597
677,191.538
11.94
6,075.40
13,179.56
90.47
1.59
8,689.24
8,628.89
7,000.87
1,388.76
5,968,188.200
677,192.143
7.39
6,103.69
13,211.33
89.65
0.78
8,689.21
8,628.86
7,032.64
1,389.41
5,968,219.968
677,192.056
3.63
6,133.31
13,243.74
88.31
357.78
8,689.79
8,629.44
7,065.04
1,389.01
5,968,252.345
677,190.890
10A41
6,16389
13,274.04
88.14
356.04
8,690.73
8,630.38
7,095.28
1,387.37
5,968,282.537
677,188.550
5.77
8,192.87
13,305.25
88.00
354.77
8,691.78
8,631.43
7,126.37
1,384.88
5,968,313.559
677,185.324
4.09
6,222.94
13,334.94
86.28
353.68
8,693.26
8,632.91
7,155.87
1,381.89
5,968,342.980
677,181.651
6.86
6,251.68
13,368.41
85,84
351.21
8,695.56
8,635.21
7,188.97
1,377.50
5,968,375.964
677,176.488
7.48
6,284.28
13,400.06
86.42
348.75
8,697.70
8,637.35
7,220.06
1,372.01
5,968,406.919
677,170.268
7.97
6,315.38
13,432.29
87.07
346.13
8,699.53
8,639.18
7,251.46
1,365.01
5,988,438.148
677,162.538
8.36
6,347.29
13,463.42
87.49
34543
8,701.00
8,640.65
7,281.61
1,357.37
5,968,468.102
677,154.196
2.62
6,378.22
13,495.24
8742
342.44
8,702.42
8,642.07
7,312.15
1,348.58
5,968,498.430
677,144.688
9.39
6,409.93
13,525.89
86.11
341.70
6,704.15
8,643.80
7,341.26
1,339.16
5,968,527.313
677,134.589
4.91
6,440.51
13,553.86
84.35
339.69
8,706.47
8,646.12
7,367.57
1,329.94
5,966,553.392
677,124.763
9.53
6,468.38
13,588.44
83.94
337.26
8,710.00
8,649.65
7,399.57
1,317.32
5,968,585.084
677,111.398
7.09
6,502.77
13,619.20
86.04
335.42
8,712.69
8,652.34
7,427.63
1,305.03
5,968,612.850
677,098.448
9.06
6,533.34
13,651.35
89.48
335.47
8,713.94
8,653.59
7,456.85
1,291.68
5,968,641.744
677,084.421
10.70
6,565.36
13,682.76
91.95
333.10
8,713.55
8,653.20
7,485.14
1,278.05
5,968,669.708
677,070.137
10.90
6,596.61
13,713.56
92.15
331.69
8,712.45
8,852.10
7,512.41
1,263.79
5,968,696.640
677,055.241
4.62
6,627.12
13,744.20
89.85
331.09
8,711.91
8,651.56
7,539.31
1,249.12
5,968,723.180
677,039.948
7.76
6,657.41
13,777.66
87.55
328.56
6,712.67
8,652.32
7,568.22
1,232.32
5,968,751.694
677,022.470
10.17
6,690.33
13,807.30
88.10
325.14
8,713.80
8,653.45
7,593.02
1,216.13
5,968,776.104
677,005.705
11.75
6,719.17
13,838.85
89.92
324.33
8,714.34
8,653.99
7,618.78
1,197.91
5,968,801.424
676,986.896
6.31
6,749.60
13,869.79
90.40
324.39
8,714.26
8,653.91
7,643.92
1,179.89
5,968,826.138
676,968.285
1.56
6,779.39
13,902.64
90.57
323.56
8,713.98
8,653.63
7,670.49
1,160.57
5,968,852.243
676,948.350
2.58
6,810.96
13,932.57
90.57
323.58
8,713.68
8,653.33
7,694.57
1,142.79
5,968,875.898
676,930.020
0.07
6,839.67
8212019 11:23:20AM Page 9 COMPASS 5000.1 Build BID
bp
Final
BP
Survey Report
Company: North America
- ALASKA - BP
Local Coordinate
Reference:
Well 15-27
Project: PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site: 15
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: 15-27B
Survey Calculation Method:
Minimum Curvature
Design: 15-27B
Database:
EDM R5K - Alaska PROD - ANCPt
Survey
MD Inc
AN
TVD
TVDSS
N/S
E/W
Northing
Easting DLeg
V. See
(usft) r)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (9100usft)
(usft)
13,964.51
90.64
324.19
8,713.34
8,652.99
7,720.37
1,123.97
5,968,901.250
676,910.597
1.92
6,870.35
13,996.08
90.40
324.25
8,713.06
8,652.71
7,745.98
1,105.51
5,968,926.419
676,891.546
0.78
6,900.73
14,026.42
90.47
325.97
8,712.83
8,652.48
7,770.86
1,088.16
5,968,950.889
676,873.616
5.67
6,930.05
14,058.92
90.54
324.86
8,712.54
8,652.19
7,797.62
1,069.71
5,968,977.204
676,854.549
3.42
6,961.50
14,090.37
90.54
325.22
0,712.24
8,651.89
7,823.39
1,051.69
5,969,002.547
676,835.931
1.14
6,991.88
14,121.63
90.64
325.54
8,711.92
8,651.57
7,849.12
1,033.93
5,969,027.846
676,817.576
1.07
7,022.13
14,153.57
90.78
326.63
8,711.53
8,651.18
7,875.62
1,016.11
5,969,053.923
676,799.142
3.44
7,053.13
14,184.06
90.88
325.44
8,711.08
8,650.73
7,900.90
999.08
5,969,078.800
676,781.523
3.92
7,082.72
14,214.30
89.99
327.24
6,710.85
8,650.51
7,926.07
982.32
5,969,103.567
676,764.180
6.64
7,112.10
14,246.02
89.10
327.24
8,711.11
8,650.76
7,952.75
965.16
5,969,129.830
676,746.398
2.81
7,143.03
14,278.17
89.68
326.50
8,711.45
8,651.10
7,979.67
947.59
5,969,156.331
676,728.203
2.92
7,174.34
14,308.98
88.89
327.50
8,711.83
8,651.48
8,005.50
930.81
5,969,181.766
676,710.825
4.14
7,204.36
14,340.50
87.18
328.12
8,712.91
8,652.56
8,032.16
914.03
5,969,208.022
676,693.426
5.77
7,235.15
14,371.90
85.84
328.34
8,714.83
8,654.46
8,058.81
897.53
5,969,234.272
676,676.306
4.32
7,265.83
Tie In Point
14,403.00
86.36
328.22
8,716,94
8,656.59
8,085.20
881.21
5,969,260.274
676,659,380
1.72
7,296.21 -.
KOP - Top of Whipstock
14,420.21
85.42
327.15
8,718.17
8,657.82
8,099.71
872.04
5,959,274.561
676,649.867
8.26
7,312.98
Interpolated Azimuth
14,450.53
83.05
325,32
8,721.22
8,660.87
8,124.78
855.27
5,969,299.236
676,632.522
9.86
7,342.28
Interpolated Azimuth
14,480.22
8274
323.52
8,724.89
8,664.54
8,148.74
838.13
5,969,322.787
676,614.826
6.11
7,370.66
First Good Survey
14,511.26
83.61
323.62
8,728.58
8,668.23
8,173.54
819.83
5,969,347.148
676,595.949
2.82
7,400.22
14,542.87
85.36
321.57
8,731.62
8,671.27
8,198.53
800.72
5,969,371.682
676,576.259
8.50
7,430.24
14,573.43
86.78
318.67
8,733.71
8,673.36
8,221.92
781.17
5,969,394.609
676,556.172
10.55
7,458.91
14,601.35
86.80
316.10
8,735.25
8,674.90
8,242.44
762.30
5,969,414.674
676,536.824
9.20
7,484.64
14,636.32
88.43
313.76
8,736.68
8,676.33
8,267.11
737.56
5,969,438.761
676,511.520
7.99
7,516.28
62112019 11:23:20AM
Page 10
COMPASS 5000.1 Build 810
50
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project:
PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Well:
15-27
North Reference:
True
Wellbore:
15-27B
Survey Calculation Method:
Minimum Curvature
Design:
15-27B
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azl
TVD
TVDSS
N/S
EAN
Northing
Easting
DLeg
V. Sec
(usft)
C)
PI
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(9100usft)
(usft)
14,661.34
88.44
311.53
8,737.36
8,677.01
8,284.06
719.17
5,969,455.267
676,492.734
8.91
7,538.5C
14,691.43
89.85
310.24
8,737.81
8,677.46
8,303.75
696.42
5,969,474.420
676,469.535
6.35
7,564.78
14,721.50
9071
308.84
8,737.66
8,677.31
8,322.89
673.23
5,969,493.012
676,445.906
5.46
7,590.70
14,755.44
92.06
308.02
8,736.84
8,676.49
8,343.98
646.65
5,969,513.472
676,418.843
4.65
7,619.61
14,781.40
91.69
305.07
8,735.99
8,675.64
8,359.43
625.81
5,969,528.426
676,397.646
11.45
7,641.25
14,811.38
92.88
303.31
8,734.80
8,674.45
8,376.26
601.03
5,969,544.673
676,372.482
7.08
7,665.54
14,840.65
93.41
302.17
8,733.19
8,672.84
8,392.07
576.45
5,969,559.898
676,347.538
4.29
7,688.80
14,871.19
91.84
298.89
8,731.79
8,671.44
8,407.56
550.16
5,969,574.772
676,320.910
11.90
7,712.35
14,900.65
91.72
295.90
8,730.88
8,670.53
8,421.11
524.04
5,969,587.703
676,294.461
10.15
7,734.02
14,935.10
91.07
291.83
8,730.04
8,669.69
8,435.04
492.55
5,969,600.891
676,262.657
11.96
7,757.88
14,960.94
92.92
291.15
8,729.14
8,668.79
8,444.50
468.52
5,969,609.785
676,238.416
7.63
7,774.99
14,990.95
92.86
289.84
8,727.63
8,667.28
8,454.99
440.45
5,969,619.618
676,210.105
4.36
7,794.45
15,020.92
91 So
289.23
8,726.46
8,666.11
8,465.00
412.22
5,969,628.967
676,181.658
4.67
7,813.51
15,050.75
91.72
287.25
8,725.60
8,665.25
8,474.34
383.91
5,969,637.634
676,153.131
6.65
7,831.97
15,081.48
91.32
285.49
8,724.78
8,664.43
8,482.99
354.43
5,969,645.598
676,123.466
5.87
7,850.18
15,113.18
90.68
283.25
8,724.23
8,663.88
8,490.86
323.73
5,969,652.742
676,092.590
7.35
7,868.08
15,140.77
91.90
281.94
8,723.61
8,663.26
8,496.87
296.81
5,969,658.124
676,065.540
6.49
7,882,93
15,170.76
93.59
281.06
8,722.17
8,661.82
8,502.85
267.46
5,969,663.407
676,036.058
6.35
7,898.59
15,195.77
91.23
280.67
8,721.12
8,660.77
8,507.56
242.92
5,969,667.540
676,011.418
9.56
7,911.40
15,220.62
90.18
279.98
8,720.81
8,660.46
8,512.01
218.48
5,969,671.420
675,986.876
5.06
7,923.95
15,250.48
88.77
283.45
8,721.09
8,660.74
8,518.07
189.25
5,969,676.795
675,957.513
12.54
7,939.64
15,282.18
88.47
286.99
8,721.85
8,661.50
8,526.39
158.67
5,969,684.394
675,926.754
11.20
7,957.92
15,310.93
88.40
289.14
8,722.64
8,662.29
8,535.30
131.35
5,969,692.663
675,899.234
7.48
7,975.63
15,344.92
88.31
29447
8,723.61
8,663.26
8,547.92
99.82
5,969,704.536
675,867.415
15.68
7,998.27
15,370.94
88.43
298.46
8,724.35
8,664.00
8,559.51
76.54
5,969,715.576
675,843.873
15.34
8,017.13
15,400.35
88.90
302.96
8,725.04
8,664.69
8,574.52
51.27
5,969,729.991
675,818.257
15.38
8,039.68
15,432.10
89.42
307.37
8,725.50
8,665.15
8,592.80
25.32
5,969,747.656
675,791.892
13.98
8,065.93
&212019 11:23:20AM Page 11 COMPASS 5000.1 Build 81D
a
BP
Final Survey Report
Company:
North America
- ALASKA - BP
Local Coordinate
Reference:
Well 15-27
Project:
PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Well:
15-27
North Reference:
True
Wellbore:
15-276
Survey Calculation Method:
Minimum CuNature
Design:
15-27B
Database:
EDM R5K -
Alaska PROD - ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
EM7
Northing
Starting
DLeg
V. Sec
(usft)
(")
0
(usft)
(usft)
(usft)
(usft)
(waft)
(usft)
(°1100usR)
(waft) _
15,46545
88.19
311.68
8,726.20
8665.85
8,614.01
-0.39
5,969,768.261
675,765.692
1344
8,094.6E
15,491.61
88.68
316.36
8,728.92
8,666.57
8,632.18
-19.19
5,969,785.982
675,746.473
17.98
8,118.16
15,522.86
88.74
320.37
8,727.62
8,667.27
8,655.52
-39.94
5,969,808.833
675,725.181
12.83
8,147.19
15,550.61
87.27
322.36
8,728.58
8,668.23
8,677.18
-57.26
5,969,830.082
675,707.366
8.91
8,173.47
15,580.31
86.96
325.11
8,730.08
8,669.73
8,701.10
-74.80
5,969,853.577
675,689.267
9.31
8,201.94
15,611.39
89.02
327.40
8,731.17
8,670.82
8,726.92
-92.05
5,969,878.969
675,671.417
9.91
8,232.11
15,640.18
91.35
329.98
8,731.08
8,670.73
8,751.52
-107.01
5,969,903.224
675,655.887
12.07
8,260.34
15,670.37
91.66
331.44
8,730.28
8,669.93
8,777.84
-121.78
5,969,929.190
675,640.511
4.94
8,290.12
15,700.11
92.43
333.33
8,729.22
8,668.87
8,804.17
-135.55
5,969,955.192
675,626.123
6.86
8,319.58
15,730.25
93.35
335.10
8,727.70
8,667.35
8,831.27
-148.65
5,969,981.979
675,612.400
6.81
8,349.52
15,760.88
93.35
338.67
8,725.91
8,665.56
8,859.39
-160.65
5,970,009.807
675,599.743
11.64
8,380.05
15,792.68
91.75
339.43
8,724.50
8,664.15
8,889.06
-172.01
5,970,039.198
675,587.694
5.57
8,411.81
15,822.79
91.54
337.14
6,723.83
8,663.28
8,917.02
-183.14
5,970,066.888
675,575.908
7.63
8,441.90
15,850.85
93.84
336.30
8,722.32
8,661.97
8,942.76
-194.22
5,970,092.365
675,564.232
8.73
6,469.88
15,882.05
93.35
334.54
6,720.38
8,660.01
8,971.08
-207.17
5,970,120.368
675,550.621
5.84
8,500.92
15,910.60
90.74
330.76
8,719.34
8,658.99
8,996.42
-220.28
5,970,145.388
675,536.927
16.08
8,529.2C
15,940.81
91.60
328.21
8,718.72
8,658.37
9,022.43
-235.61
5,970,171.038
675,520.988
8.91
8,558.90
15,973.86
89.72
324.29
8,718.34
8,657.99
9,049.91
-253.97
5,970,198.070
675,501.995
13.15
8,590.99
16,000.54
90.83
323.30
8,718.22
8,657.87
9,071.43
-269.73
5,970,219.221
675,485.738
5.57
8,616.61
16,025.53
92.61
323.87
8,717.47
8,657.12
9,091.53
-284.55
5,970,238.968
675,470.444
7.48
8,640.57
16,050.69
93.07
326.56
8,716.22
8,655.87
9,112.17
-298.89
5,970,259.262
675,455.631
10.83
8,664.86
16,080.49
91.60
329.88
8,715.00
8,654.65
9,13748
-314.57
5,970,284.193
675,439.366
12.18
8,694.01
16,110.70
91.53
333.18
8,714.18
8,653.83
9,164.02
-328.96
5,970,310.390
675,424.355
10.92
8,723.87
16,140.71
91.17
335.91
8,713.47
8,653.12
9,191.11
-341.85
5,970,337.166
675,410.832
9.17
8,753.74
16,170.62
91.13
339.36
8,712.87
8,652.52
9,216.76
-353.23
5,970,364.540
675,398.811
11.53
8,783.61
16,200.79
90.92
342.57
8,712.33
8,651.98
9,247.27
-363.07
5,970,392.812
675,388.310
10.66
8,813.77
16,230.89
91.29
345.91
8,711.75
8,651.40
9,276.23
-371.24
5,970,421.570
675,379.462
11.16
8,843.77
6212019 11:23:20AM
Page 12
COMPASS
5000.1 Build 81D
by
Company: North America
- ALASKA - BP
Project: PBU
Reference:
Site: 15
Well: 15-27
Wellbore: 15-278
Design: 15-27B
Survey
MD Inc
(usft) l°)
16,260.97
91.01
16,290.86
91.44
16,320.71
91.44
16,350.72
91.11
16,380.40
92.27
16,411.06
92.70
16,440.92
91.26
16,475.80
91.81
16,512.00
91.81
Projeciton to TO
BP
Final Survey Report
621/2019 11: 23: 20AM Page 13 COMPASS 5000.1 Build 81D
Local Coordinate
Reference:
Well 15-27
TVD Reference:
RT @ 60.35usft (15-27A)
MD Reference:
RT @ 60.35usft (15-27A)
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
_
349.23
8,711.15
8,650.80
9,305.59
-37771
5,970,450.773
675,372.304
11.07
8873.5E
352.58
8,710.51
8,650.16
9,335.10
-382.44
5,970,480.156
675,366.892
11.30
8,902.92
355.62
8,709.76
8,649.41
9,364.77
-385.50
5,970,509.753
675,363.131
10.18
8,931.86
359.00
8,709.09
8,648.74
9,394.74
-386.91
5,970,539.675
675,361.022
11.31
8,960.50
2.36
8,708.21
8,647.66
9,424.40
-386.56
5,970,569.333
675,360.679
11.97
8,988.25
4.52
8,706.88
8,646.53
9,454.97
-384.72
5,970,599.940
675,361.800
7.18
9,016.35
7.86
8,705.85
8,645.50
9,484.64
-381.50
5,970,629.669
675,364.322
12.17
9,043.13
10.57
8,704.92
8,644.57
9,519.05
-375.92
5,970,664.202
675,369.097
7.93
9,073.56
10.57
8,703.77
8,643.42
9,554.62
-369.28
5,970,699.913
675,374.899
0.00
9,104.71
621/2019 11: 23: 20AM Page 13 COMPASS 5000.1 Build 81D
Pmjnt PBU
aammsemexom w LLBOREDETAiL3: 1S27e RE ENCEIWD TNM
N Nan:ra
SBs: 16
ry.Wrw 1527Bmaaineie(nR rOn WO 159. Tme Nam
Well: 16-17
se.yNnnssr VM.CVDlflelaa,8'. nTBm35wn1152]n)
WNRwm: 169B
p1e 1527A NS)RO..
Apmal: 1698
Meawea PT��Vxanl nRl
were: T..MD: 14371.90
teas.., WmW. wwnumC.
AOGCC Offsets within 500ft
Fasting (500 usMn)
Fasting (500 usNin)
�q6+640
�P
North America - ALASKA - BP
PBU
15
15-27
15-27B
15-27B
500292224302
AOGCC Offset Well Report
21 June, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
15
Site Error:
0.00usft
Reference Well:
15-27
Well Error.
0.00usft
Reference Wellbore
15-27B
Reference Design:
15-27B
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 15-27
RT @ 60.35usft (15-27A)
RT @ 60.35usft (15-27A)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference
15-27B
Fiber type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
To
Interpolation Method:
MD Interval t00.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,848.56usft Error Surface:
Elliptical Conic
Survey Program
Date 6/21/2019
From
To
lush)
lush) Survey (Wellbore)
Tool Name
Description
431.35
3,440.35 15-27 Srvy 1 MWD (15-27)
MWD
MWD - Standard
3,705.00
4,213.00 15-27APB1 Srvy 1 GYD GC SS (15-27AP
GYD-GC-SS
Gymdata gyro single shots
4,307.01
11,405.1715-27APB1 Srvy 2 MWD+IFR+MS(15-27A
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
11,445.70
11,898.41 15-27APB1 SrW 3 MWD+IFR+MS (15-27A
MWD+IFR+MS-WOCA
MWD + IFR +Muth Station W/O Crustal
11,926.82
14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A)
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
14,403.00
16,512.00 Survey#1 (15-27B)
MWD
MWD -Standard
61212019 11:29:15AM Page 2 of 4 COMPASS 5000.1 Build BID
BP
by Anticollision Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project:
PBU
TVD Reference:
RT @ 60.35usft (15-27A)
Reference Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Site Error:
O.00usft
North Reference:
True
Reference Well:
15-27
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
15-27B
Database:
EDM RSK-Alaska PROD -ANCP1
Reference Design:
15-27B
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well -Wellbore - Design
(usft)
(usft)
(usft)
75
15-05 - 15-05 - 15-05
4,093.46
4,200.00
594.60
15 -05 -15 -OSA -15-05A
4,093.46
4,200.00
594.60
15-05 - 15-05APB1 - 15-05APB1
4,093.46
4,200.00
594.60
15-05 - 15-050 - 15-058
4,093.46
4,200.00
594.60
15-05 - 15-05BPB1 - 15-05BPB1
4,093.46
4,200.00
594.60
15-06 - 15-06 - 15-06
4,168.70
4,300.00
304.80
15 -06 -15 -06A -15-06A
4,168.70
4,300.00
304.80
15-06 - 15-06APB1 - 15-06APBI
4,168.70
4,300.00
304.80
15-16 - 15-16 - 15-16
4,027.65
4,100.00
306.90
15 -16 -15 -16A -15-16A
4,027.65
4,100.00
306.90
15-16 - 15-16B - 15-16B
4,034.58
4,100.00
306.88
15-16 - 15-16BPB1 - 15-16BPBI
4,034.58
4,100.00
306.88
15-16 - 15-16C - 15-16C
4,034.58
4,100.00
306.88
15-16 - 15-16CPB1 - 15-16CPB1
4,034.58
4,100.00
306.88
15-16 - 15-16CPB2 - 15-16CPB2
4,034.58
4,100.00
306.88
15-17 - 15-17 - 15-17
3,915.59
4,000.00
125.87
15-18 - 1578 - 15-18
2,067.00
2,100.00
163.01
15 -18 -15 -18A -15-18A
2,087.00
2,100.00
163.01
15-19 - 15-19 - 15-19
4,001.14
4,000.00
165.37
15 -19 -15 -19A -15-19A
4,001.14
4,000.00
165.37
15-21 - 1521 - 15-21
1,389.67
1,400.00
31.49
15 -21 -15 -21A -15-21A
1,396.69
1,400.00
32.05
15-22 - 1522 - 15-22
392.50
400.00
63.86
1527 - 1527 - 15-27
4,093.59
4,100.00
2.74
15 -27 -15 -27A -15-27A
14,687.91
14,700.00
55.63
15-27 - 15-27APBI - 15-27APB1
12,232.28
12,270.00
93.02
15-28 - 15-28 - 15-28
691.72
700.00
121.34
15-28 - 15-28A - 15-28A
691.72
700.00
121.34
1528 -15 -28B -15-28B
13,241.12
13,900.00
95.33
15-28- 15-28BPB1 - 15-288PB1
691.72
700.00
121.34
15-28 - 15288PB2 - 15288PB2
691.72
700.00
121.34
15-29 - 15-29 - 15-29
192.24
200.00
180.80
15-29 - 15-29A- 15-29A
192.24
200.00
180.80
15-29 - 15-29APB1 - 15-29APB1
192.24
200.00
180.80
1549 - 15-298 - 15-298
198.06
200.00
180.86
15-29-15-29BPB1-15-29BPB1
198.06
200.00
180.86
15-33 - 15-33 -15-33
2,875.53
2,900.00
124.71
15 -33 -15 -33A -15-33A
2,875.53
2,900.00
124.71
15-33 - 15-338 - 15338
2,875.53
2,900.00
124.71
15-33 - 15-33C - 1533C
2,875.53
2,900.00
124.71
15-33 - 15-33PB1 - 15-33PBI
2,875.53
2,900.00
124.71
15-33-15-33PB2-1533PB2
2,875.53
2,900.00
124.71
15-41 - 1541 - 15-41
7,652.51
7,600.00
463.09
15 -41 -1541A -1541A
7,652.51
7,600.00
463.09
1541 - 15-41 B - 1541 B
7,652.51
7,600.00
463.09
15-41 - 15-41 BPB1 - 1541 BP81
7,652.51
7,600.00
463.09
15-43 - 15-43 - 1543
595.88
600.00
245.32
15-44 - 15-44 - 1544
1,677.92
1,700.00
190.75
1545 - 1545 - 1545
1,471.92
1,500.00
191.36
1545 - 1545A- 1545A
1,471.92
1,500.00
191.36
1545 - 15-45APBI - 1545APB1
1,471.92
1,500.00
191.36
15-45 - 1545APB2 - 1545AP62
1,471.92
1,500.00
191.36
15-45 - 1545B - 15458
1,471.92
1,500.00
191.36
6212019 11:29:15AM Page 3 of 4 COMPASS 5000.1 Build 81D
.e
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
15
Site Error:
0.00usft
Reference Well:
1527
Well Error:
0.00usft
Reference Wellbore
15278
Reference Design:
15278
Summary
Site Name
Offset Well - Wellbore- Design
15
15-45- 15-455PB1 - 15456PB1
15-45 - 15-45C - 15-45C
15-45 - 15-45CPBI - 1545CPB1
15-45 - 1545D - 15-45D
15-45-1545DPB1-1545DPB1
15-45 - 1545P01 - 1545PB1
15-46 - 1546 - 15-46
15-46 - 154611 - 1546LI
15-46-154611 PB1-15461-1 PB1
15-49 - 1549 - 15-49
15-49 - 1549A- 1549A
15-49-15-49APBI-1549AP81
15-49 - 15498 - 15498
15-49 - 1549C - 15-49C
1549-1549PB1-1549PB1
K
K-10 - K -10D - K -10D
K-10 - K-10DPB1 - K-10DP81
BP
Anticollision Report
Local Co-ordinate Reference: Well 15-27
TVD Reference: RT @ 60.35usft (15-27A)
MD Reference: RT @ 60.35usft (1527A)
North Reference: True
Survey Calculation Method: Minimum Curvature
Output errors are at 1.00 sigma
Database: EDM R5K-Alaska PROD -ANCP1
Offset TVD Reference: Offset Datum
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
1,471.92 1,500 00 191.36
1,471.92 1,500 00 191.36
1,471.92 1,500.00 191.36
1,471.92 1,500.00 191.36
1,471.92 1,500.00 191.36
1,471.92 1,500.00 191.36
1,768.74 1,800.00 93.79
1,768.74 1,800.00 93.79
1,768.74 1,800.00 93.79
1,091.38 1,100.00 259.69
1,091.38 1,100.00 259.69
1,091.38 1,100.00 259.69
1,091.38 1,100.00 259.69
1,091.38 1,100.00 259.69
1,091.38 1,100.00 259.69
14,851.88 15,325.00 664.71
14, 917.29 14,313.00 1,504.23
62112019 1129: 15AM Page 4 of 4 COMPASS 5000.1Build 81D
BA �� PRINT DISTRIBUTION LIST
t UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME 15-27B
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider@bhge.com
STATUS
COMPANY
Final Replacement:
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
4
1 I BP North Slope.
EOA, PBOC. PRB-20 (Office 1091
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ***
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
,Attn: Nancy Landi
2190 45
30 96 2
ase sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
:rotechnical Data Center, 1-112-1
) E. Benson Blvd.
:h, AK 99508 or GANCPDC@bp365.onmicrosoft.com
LOG TYPE GR - RES
LOG DATE June 21, 2019
TODAYS DATE July 3, 2019
Revision
No Details:
Rev. Requested by:
FIELD/
FINAL CD/DVDF,ETA, D
FINAL
PRELIM
(las, d1Ch PM
I
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTSFur
rKIN # OF COPIES
IF OF COPIES
# OF COPIES
01 01 1 11 0
RECEIVED
0 1 1 1 1 1 0 1 0
0 1 0 1 1 1 0 0
TOTALS FOR THIS PAGE: 0 2 4 2 0
i
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Sean Mclaughlin
Engineering Team Lead
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
w .aogcc.alaska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-27B
BP Exploration (Alaska), Inc.
Permit to Drill Number: 219-045
Surface Location: 324' FNL, 58' FWL, SEC. 22, TI 1N, R14E, UM
Bottomhole Location: 3950' FSL, 251' FEL, SEC. 09, THN, R14E, UM
Dear Mr. Mclaughlin:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
l
2:sie L. Chmielowski
Commissioner
DATED this L day of April, 2019.
IIGVL_1 V LCL/
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS
PERMIT TO DRILL MAR 2 6 2019
20 AAC 25.005
Is. Type of Work:
ib. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑
1c. Specify iflyeljiq fyr%
Drill ❑ Lateral ❑
Stratigrephic Test ❑ Development - Oil 0. Service - Wnj ❑ Single Zone 0•
Coalbed Ga s(`.M�Ydtl1IMh�R6
m
Redrill 0- Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU 15-27B -
3 Address:
6. Proposed Depth:
12. FieldlPool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 16536' • TVD: 8666'ss
PRUDHOE BAY, PRUDHOE
OIL
4a Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028306 8 028303
8, DNR Approval Number:
13. Approximate spud date:
Surface: 324' FNL, 58' FVVL, Sec.22, TllN, R74E, UM
478' FSL, 1202' FVWL, Sec. 10, TI IN, R14E, UM
78-084
June 1, 2019
Top of Productive Horizon:
9. Acres in Property: 2560
14. Distance to Nearest Property:
Total Depth: 3950' FSL, 251' FEL, Sec. 09, T11 N. R74E, UM
7165
4b Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 60.35. feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 675968 • y- 5961157 Zone - ASP 4
GL bove Elevation aMSL: 3220 •feet
16. Deviated wells: Kickoff Depth: 14400 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 93 degrees
Downhole: 3370 • Surface: 2500
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hale Casinq Weidhl Grade I Coupling Len th
MD TVD MD TVD (includinq stage data)
4-112" -1/2"x2-7/8" 93#/6.5# 13Cr85 STUHYD511 5200
11310' 8019'ss 16510' 8667'ss Uncemented Liner w/ACID &Swell
x2-3/8" /4.7#
Packers
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured).
Effect. Depth MD (8):
Effect. Depth TVD (ft):
Junk (measured):
14870 8732
11903
11903
8560
None
Casing Length Size Cement Volume MD TVD
Concluctor/Structural 80 20" 232 ou It Coldest II 29-109 29-109
Surface 3457 13-3'8" 2584 cu It Coldest III. 460 cu If Class'G' 29-3486 29-3485
Intermediate 3784 am.. 2780 cu It Class'G' 26-3810 26-3809
Liner 7788 7• 221 cu It Class'G'. 422 cu H Class'G' 3658-11446 3657-8191
Liner 3591 4-1/2' 505 cu it Class'G' 11271 - 14862 8047-8732
Perforation Depth MD (ft): 11462 -14720 Perforation Depth TVD (ft): 8204-8729
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Hartlev. Josephine
from without prior written approval.
Contact Email Josephine.Hartley(8)bp.cem
Authorized Name Mclaughlin, Sean M
Authorized Title Engine -ng Team Lead - CTD & RWO Phone +1 9075644570
QContact
Z S
J/_Z5
Authorized Signature ,/-'- Date
Commission Use Only
Permit to Drill
Permit Approval
See cover letter for other
Number: `J�7
API: 50- 029-22243-02A0'
Date:
requirements:
Conditions of approval : If box is checked, welt may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
OthecV(A�ETE23•r'%b 35oOR!S Samples req'd: Yes ❑ IN W Mud log req'd: Yes ❑/ No 63'
H2S measures Yes [2/ No ❑ Directional svy req'd: Yes C3 No 0
Spacing exception mq'd: Yes ❑ No Inclination -only svy req'd: Yes ❑ No 5
Post initial injection MIT req'd: Yes ❑ No 11/O
/n' q
-S'OfJ 5✓dh* e ��1/�� �rif�K/
BY
APPROVED
Approved by: COMMISSIONER THE COMMISSION Date: I. 1
Form 10401 Revi 1 5/2017 This permit is valid for 24 months from the date of approval (20 AAC 25.005(9)) Submit Farm and
M�QIIA9R�
AftachmarrtsinDuplicate
To: Alaska Oil & Gas Conservation Commission
From: Josi Hartley
CTD Engineer
Date: March 25, 2019
Re: 15-27B Permit to Drill Request
Obp
Approval is requested for a permit to drill a CTD sidetrack from well 15-27A with the Nabors CDR2 Coiled
Tubing Drilling rig on or around June 19, 2019.
Proposed plan for 15-27B: The sidetrack 15-27B will be a 2136' horizontal CST that will kick -out from the 15-27A Ivishak
producer. The CST will be drilled to the north and will target remaining oil potential that has not yet been recovered in
existing completions in Zone 1. The well will utilize an open hole Autonomous Inflow Control Device (AICD) completion to
manage the high gas volumes that are expected from a GD well. The sidetrack will be drilled on or around June 1", 2019.
The rig will move in, test BOPE and kill the well. The 3.80" window will be milled off a 4-1/2" monobore whipstock set pre -
rig. The well kicks -off in Zone 1, geo steer low in section and potentially dip into the stratigraphic BSAD. The proposed
sidetrack will be completed with 2-3/8" x 2-7/8" x 3-1/2" 13CR liner with an AICD and swell packer completion.
Rig
Work (scheduled to begin June 1", 2019)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2500 psi).
2.
Mill 3.80" Window + 10' of rathole.
3.
Drill production lateral: 4.25" OH, ^2136' (12 deg DLS planned). '
4.
Run 3-1/2" x 2-7/8" x 2-3/8" 13Cr liner with Swell Packers and AICDs to TD.
5.
Freeze protect well to a min 2,200' TVDss.
6.
Close in tree, RDMO.
s
Post -Rig Work:
1. V: Tree work as needed.
2. SL: Drift and Set LTP. Set and test LTP
3. FB: PT LTP.
4. CT: RPM. N2 Lift.
5. T: Test wel I.
Set KO Gas Lift Design for potential PBGL.
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (430 psi over -balance).
Disposal:
• All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >ll must go to GNI.
Hole Size:
• 4.25" for entirety of the production hole section.
Liner Program:
• 2-3/8", 4.7#, HYD 511, 13Cr liner with AICDs and Swell Packers: 15,175' MD -16,510' MD
• 2-7/8", 6.5#, STL, 13Cr solid liner: 14,390' MD -15,175' MD
• 3-1/2", 9.3#, STL 13Cr solid liner: 11,310' MD -14,390' MD
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (430 psi over -balance). ✓
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 96', inclination at kickoff point is 86'.
• Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run.
• Distance to nearest property -17,165' '
• Distance to nearest well within pool —615' (15-29A)
Logging:
MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
Gamma Ray / CCL / RPM log planned post -rig through the entire production liner.
Perforating:
• No perforating is planned for this well. AICD/Swell Packer completion.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards:
• DS 15 is considered an H2S pad. Most recent H25 reading on 15-27A: 12 ppm (09/28/18). Maximum H2S reading on
the pad: 50 ppm on 15-21A (2/24/01).
• Lost circulation risk on 15-27B is considered Low.
Reservoir Pressure:
• The reservoir pressure on 15-27B is expected to be 3370 psi at 8700' TVDSS (7.45 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2500 psi.
• A min EMW of 8.4 ppg for this well will provide 430 psi over -balance to the reservoir.
Josi Hartley CC: Well File
CTD Engineer Joseph Lastufka
564-4570
TREE= CMN
WELLHEAD =
FMC
ACTUATOR=
BAKER
KB. B -EV =
67'
BF. 3EV =
?
KOP=
3810'
Max Angle =
96'@ 12521'
Datum MD=
NA
Datum ND=
saw SS.
20• CORD,
91.5 #, H-40,
D= 19.124'
13-318' CSG, 688, K-55 XO TO L-80
13-3/8• CSG. 68#,L-80, D= 12.415-
Minimum ID = 3.725" @ 11266'
4-112" HES XN NIPPLE
479. L-80, D = 8.681"
15-27A SAP. NOTES: WELL ANGLE > 70' @ 12177'.
"'4-12" CHROME TBe**ORIG WELL NOT SHOWN
BELOW WHPSTOCK"'
13C R-85 VAM TOP, .0152 6pf, D =
T LW
4422•
.0383
= 3.813•
GAS LFT MANDRAS
ST
PEFFORATION SM ARY
TVD
I DEV
Rff LOG: MAO on 05/16/10
VLV
LATCH
ANGLEAT TOP PEW. 33-@ 11467
DATE
Note: Refer to RadueOon OB for Istorieaf perf data
SIZE
SPF INTERVAL
Opn/Sgz
DATE
2-12'
6 11462-11472
O
0210SM8
2-112'
6 11484 - 11494
O
06117118
2-7/8'
6 12500-129W
C
05/16110
2-7/8'
6 13620- 14180
C
05/16110
2-71W
6 14360- 14720
C
05116110
13C R-85 VAM TOP, .0152 6pf, D =
T LW
4422•
.0383
= 3.813•
GAS LFT MANDRAS
ST
MD
TVD
I DEV
I TYPE I
VLV
LATCH
PORT
DATE
3
3549
3548
1
MAG
DOME
RK
16
0523110
2
7778
6126
64
KBG2
SO
BK
20
0523110
1
11096
7902
34
KBG2
DMY
SK
0
05/18110
365V I9-5/8' X 7' BKR ZXP LTP w /11RACK SLt
ID=6.19'
3673' 9-5/9' X 7' BKR FLIXLOCK LNR HGl7,
D = 6.180'
MLLOUT VNPDOW(15-27A) 3810'-3827-
Nll' Eb.i
PBTD H 14773-
DATE REV BY COMMENTS
DATE I REV BY COMMENTS
02!15192 ORIGINAL COMPLETIONADFERFS
(06117118)
0 ES SIDETRACK(15-27A)
05119NN�
RIC C DRLG HO OORRECTIONS
0525/10 WECJPJC GLV 00 (05123110)
7
08!09110 HIJHD DR -G DRAFT COFffCTIDNS
0012118 BTWJMD SET ISO PLUG 8 ADPERFS
r X 4-1/2" FES TNT PKF
471x-- HES X NP. D=
12' FES XN NP, D - 3.725-
T X 5' ZXPN HRD-E LTPw /TEBACK
SLV. D = 4.20'
11_2W I 7- X 5- BKR FLEXLOCK
HGF , ID= 4.220•
11287-1 5- X 4-12' XO, D = 31
ISO PLM (02/05118) 11
PRUDHOE BAY tlr1T
WELL: 15-27A
PEFW No: 2100230
AR No: 50-029-22243-01-00
SEC 22, TIM RME 324' FPL 8 58' FWL
BP Bcploration (Alaska)
TREE=
WELHEAD=
FMC
ACTUATOR=
DEVI
103. ELE/ =
6T
BF. E_EV =
?
KOP=
3810'
Max Angle =
_° @ '
Datum MID
'
Datum TVD=
8800'SS
PROPOSE
REV 2
20' COPD, 110'
91.5 #, H-40,
D = 19.124"
13-3/8" CSG, 68#, K-55 XO TO L-80 113'
13-3/8" CSG, 68#,L-80, D =12.415" 3510'
Minimum ID =3.725"@ 11266'
4-1/2" HES XN NIPPLE
V=&681,
.0152 bpf, D = 3.958"
j45KB LTP �-j 11300'
TOP OF LNR 1131W
SAFE TOTES: WELL ANGLE > 70" @ _'.
15-27P
MAX DLS:_* @ '. **`4-1/2" CHROME TBG&
LNR`*`
41/2' LNR 12.6#, L-80 MT -M, —14400' i'
.0152 bpf, D=3.958"
2-7/8" LNR, 6.5#,13CR-80, _bpf, ID=_" — 15175'
2-3/8" X 3. OH PACKERS, ID =
NO DEPTH
10
9
8
7
6
5
4
3
2
1
2-3/8" LNR,_#, 13CR80, ._ bpf, D = — 16510'
GASLFTMANDRELS
ISTI
MD
I TVDj
DEVI
TYPEI
VLV
ILATCHI
PORT
DATE
3
3549
3548
1
MNG
MG
DOME
RK
16
05/23/10
2
7778
6126
64
K
SO
BK
20
05/23/10
1
11096
7902
34
KBG2
fJA4Y
BK
0
05/18/10
3656' H9-5/8"X7"BKR ZXP LTPw/FLIX-LOCK
TACK SLEEVE, D = 6.180"
3673' 9-5/8" X 7" BKR FLEXLOCK LNR HGR
D=6.180'
MLLOIJT WN)OW(15-27A) 3810'-382T
jV 4-1/2"HES X NP, D=3.813'
11165' -17"X4-1 /2" HES TNT PKR, D = 3.856"
11196' 4-1/2" HES X NP, D = 3.813"
11266' 4-1/2" HES XN NP. D = 3.725'
I7" X " ZXPN 0.
HRE LTPw /BKR FLEX -LOCK
HGRB TEBP,CK SLV, D=4.20"
41/2" WLEG. D = 3 9SW
-1 11310' H3.70' DEPLOY SLV, ID=3.00"
3-1/2" _ X NIP, ID = 2.813"
14390' 3-1/2" X 2-7/8" XO, D = _"
MILLOUT WINDOW (15-27B) 14400'-
5175- 2-7/8" z 2-3/8" XO, ID = "
2-38"AICD JOINT. ID= "
NO
DEPTH
NO. AICD
10
02/15/92
9
05119/10
8
SIDETRACK(15-27A)
7
CTD ST (15-2713)
6
12/17/18
JND
5
01/15/19
4
BULT PROPOSED REV 1
3
2
1
DATE
FEV BY
COMM34TS
DATE REV BY COMMENTS
02/15/92
CRIGINALCOMPLETION
05119/10
WlS
SIDETRACK(15-27A)
CTD ST (15-2713)
12/17/18
JND
BULT PFnPOSED
01/15/19
ZB/JMD
BULT PROPOSED REV 1
PRUDHOE BAY LUT
WB -L: 15-276
PEFUT No:
API No: 50-029-22243-01-01
. T11 N R14E 324' FNL & 58' FWL
North America - ALASKA - BP
PBU
15
15-27
PLAN 15-27B
OrIiM61 W-14T11OM
BP Coil Tubing Report
22 March, 2019
R e
Company:
North America - ALASKA - BP
Project:
PBU
Site:
15
Well:
15-27
Wellbore:
PLAN 15-27B
Design:
15-27B WP05
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones ,
Geo Datum: NAD27' OGP-Usa AK [4267.15864]
Map Zone: NAD27 ° OGP-Usa AK / Alaska zone 4 [26734.1586,
Site
15, TR -11-14
5,958,837.360 usft
Site Position:
Easting:
From:
Map
Well 15.27
Position Uncertainty:
0.00 usft
Mean Sea Level
Well
15-27,15-27
RT @ 60.35usft (15-27A)
Well Position
°N/ -S 0.00 Left
N
Latitude:
.E/ -W 0.00 usft
E
Position Uncertainty
0.00 usft
EDM R5K - Alaska PROD - ANCP7
Wellbore
PLAN 15-27B
Mean Sea Level
Magnetics
Model Name Sample Date
Decl
Dip Angle Field Strength
BGGM2018 7/1/2019
Using geodetic scale factor
Design
15-27B WP05
Audit Notes:
16.82
Version:
Phase:
PLAN
Vertical Section:
Depth From (TVD)
-NI-S
husk)
(usft)
Direction
-33.99
0.00
BP
5,958,837.360 usft
BP Coil Tubing Report
Easting:
Local Coordinate Reference:
Well 15.27
TVD Reference.
Mean Sea Level
0.000 in
MD Reference:
RT @ 60.35usft (15-27A)
North Reference:
True
Latitude:
Survey Calculation Method:
Minimum Curvature
675,967.790 usft
Database:
EDM R5K - Alaska PROD - ANCP7
Elevation:
System Datum:
Mean Sea Level
Ground Level:
ination
Using Well Reference Point
Dip Angle Field Strength
Using geodetic scale factor
Northing:
Wellhead
5,958,837.360 usft
Latitude:
Easting:
676,296.980 usft
Longitude:
Slot Radius:
0.000 in
Grid Convergence:
orthing:
5,961,157.180 usft •
Latitude:
asting:
675,967.790 usft
Longitude:
Elevation:
33.99 usft
Ground Level:
ination
Dip Angle Field Strength
(nT)
16.82
80.93
57.419
Tie On Depth: 14,371 90
+EI -W
Direction
(usft)
(°)
0 00
340 A0
70° 17'35.236 N
148'34'21.213W
1.34 °
70° 17'58.123 N
148' 34'29.222 W
32.20 usft
322/2019 2:17,09AM Page 2 COMPASS 5000.1 Build BIO
BP
BP Coil Tubing Report
Company: North America - ALASKA - BP
Northing
Easting
Project: PBU
DLeg
V. Sec
Site: 15
(usft)
(usft)
(usft)
Well: 15-27
(°1100usft)
(usft)
Wellbore: PLAN
15-278
5,969,234.272
676,676.306
Design: 15-276 WP05
0.00
7,265.83
Survey Tool Program
Date 3/22/2019
882.79
5,969,257.765
From
To
1.73
7,293.28
(usft)
(usft) Survey (Wellbore)
872.11
Tool Name
431.35
3,440.35 15-27 Srvy 1 MWD (15-27)
9.00
MWD
3,705.00
4,213.00 15-27APB1 Srvy 1 GYD GC
SS (15-27AP
GYD-GC-SS
4,307.01
11,405.17 15-27APB1 Srvy 2 MWD+IFR+MS
(15-27A
MWD+IFR+MS-WOCA
11,445.70
11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS
(15-27A
MWD+IFR+MS-WOCA
11,926.82
14,371.90 15-27A Srvy 1 MWD+IFR+MS (15-27A)
MWD+IFR+MS-WOCA
14,371.90
16,536.00 15-27B WP05 (PLAN 15-27B)
MWD
Planned Survey
5,989,386.332
676,551.914
MD
Inc Azi
TVDSS
NIS
(usft)
1°1 (I
(usft)
(usft)
14,371.90
85SA 328.34
8,654.48
8,058.81
TIP
5,969,457.520
676,443.848
14,400.00
86.31 328.22
8,656.40
8,082.65
KOP
5,969,490.942
676,349.855
14,420.00
84.93 327.06
8,657.93
8,099.50
Start DLS 12.00 TFO -140.00
5,969,502.323
676,280.888
14,460.00
81.26 323.94
8,662.73
8,132.22
Start DLS 12.00 TFO 50.00
478.80
5,969,505.962
14,500.00
83.69 319.76
8,667.97
8,153.39
14,570.11
88,00 312.52
8,673.06
8,213.75
Start DLS 12.00 TFO -90.00
12.00
14,600.00
88.00 308.93
8,674.10
8,233.23
14,700.00
88.07 296.92
8,677.54
8,287.45
14,800.00
88.23 284.91
8,680.78
8,323.07
14,870.00
88.38 276.51
8,682.85
8,336.06
Start DLS 12.00 TFO 89.00
14,900.00
88.45 280.11
8,683.66
8,340.40
15,000.00
88.71 292.11
8,686.17
8,368.09
15,100.00
89.03 304.11
8,688.15
8,415.12
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Description
MWD - Standard
Gyrodata gyro single shots
MWD + IFR + Multi Station W/O Crustal
MWD + IFR + Multi Station W/O Crustal
MWD+ IFIR +Multi Station W/O Crustal
MWD - Standard
Well 15-27
Mean Sea Level
RT Q 60.35usft (15-27A)
True
Minimum Curvature
EDM R5K-Alaska PROD -ANCP1
EIW
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(°1100usft)
(usft)
(')
897.53
5,969,234.272
676,676.306
0.00
7,265.83
0.00
882.79
5,969,257.765
676,661.013
1.73
7,293.28
-14.29
872.11
5,969,274.354
676,649.949
9.00
7,312.76
-140.00
849.63
5,969,306.535
676,626.708
12.00
7,351.19
-140.00
825.14
5,969,337.123
676,601494
1200.
7,388.86
50.00
776.72
5,989,386.332
676,551.914
12.00
7,452.74
.5945
754.08
5,969,405.281 -
676,528.827
12.00
7,478.80
-90.00
670.34
5,969,457.520
676,443.848
12.00
7,558.39
-89.87
577.15
5,969,490.942
676,349.855
12.00
7,623.73
-8946
508.47
5,969,502.323
676,280.888
12.00
7,659.43
-89.07
478.80
5,969,505.962
676,251.125
12.00
7,673.65
89.00
382.93
5,969,531.403
676,154.643
12.00
7,732.47
88.90
294.91
5,969,576.351
676,065.548
1200.
7,806.76
88.60
31222019 2: 17:09AM Page 3 COMPASS 5000.1 Build 81D
3222019 2:17:09AM Page 4 COMPASS 5000.1 Build 810
BP
by
BP Coil Tubing Report
Company: North America
-ALASKA - BP
Local Coordinate
Reference:
Well 15-27
Project: PBU
TVD Reference:
Mean Sea Level
Site: 15
MD Reference:
RT (a3 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: PLAN 15-27B
Survey Calculation
Method:
Minimum Curvature
Design: 15-27B WP05
Database:
EDM R5K - Alaska PROD - ANCPI
Planned Survey
MD Inc
Azi
TVDSS
NIS
ENV
Northing
Easgng
OLeg
V. Sec
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(MR)
('I100usft)
(usft)
(')
15,150.00
89.21
310.11
8,688.92
8,445.27
255.06
5,969,605.557
676,025.008
12.00
7,848.72
88.36
Start OLS 12.00 TFO .90.60
15,200.00
89.16
304.11
8,689.64
8,475.42
215.20
5,969,834.765
675,984.461
12.00
7,890.68
-90.50
15,300.00
89.09
292.11
8,691.17
8,522.44
127.17
5,969,679.710
675,895.355
12.00
7,964.98
-90.41
15,350.00
89.07
286.11
8,691.98
8,538.80
79.96
5,969,694.955
675,847.773
12.00
7,996.50
-90.23
Start DLS 12.00 TFO 88.60
15,400.00
89.23
292.11
8,692.72
8,555.16
32.73
5,969,710.202
675,800.185
12.00
8,028.02
88.50
15,500.00
89.58
304.10
8,693.76
8,602.17
-55.31
5,969,755.143
675,711.070
12.00
8,102.32
88.41
15,600.00
89.95
316.10
8,694.17
8,666.47
-131.66
5,969,817.626
675,633.238
12.00
8,188.85
88.29
15,700.00
90.31
328.09
8,693.95
8,745.22
-192.99
5,969,894.920
675,570.089
12.00
8,283.83
88.24
15,800.00
90.67
340.09
8,693.09
8,835.00
-236.61
5,969,983.648
675,524.384
12.00
8,383.11
88.261
15,900.00
90.99
352.08
8,691.64
8,931.88
-260.61
5,970,079.930
675,498.120
12.00
8,482.36
88.3711
16,000.00
91.27
4.08
8,689,65
9,031.62
-263.95
5,970,179.560
675,492.445
12.00
8,577.22
88.54 j
16,050.00
91.39
10.08
8,688.49
9,081.20
-257.79
5,970,229.267
675,497.442
12.00
8,621.71
88.781
Start DLS 12.00 TFO 86.00
16,100.00
91.80
4.09
8,687.09
9,130.78
-251.63
5,970,278.973
675,502.443
12.00
8,666.19
-86.00
,
16,200.00
92.56
352.11
8,683.27
9,230.47
-254.93
5,970,378.551
675,496.807
12.00
8,761.00
-86.17
16,300.00
93.21
340.11
8,678.22
9,327.24
-278.86
5,970,474.733
675,470.620
12.00
8,860.12
-86.63
16,330.00
93.37
336.51
8,676.49
9,355.07
-289.92
5,970,502.287
675,458.905
12.00
8,890.05
-87.23
Start DLS 12.00 TFO 92.00
16,400.00
93.05
344.92
8,672.57
9,420.98
-312.99
5,970,567.635
675,434.305
12.00
8,959.87
9200
16,500.00
92.47
356.92
8,667.74
9,519.43
-328.73
5,970,665.684
675,416.266
12.00
9,057.77
92.471
16,536.00
92.23
1.23
8,666.27
9,555.38
-329.31
5,970,701.612
675,414.843
12.00
9,091.75
93.05
TO at 16536.00
3222019 2:17:09AM Page 4 COMPASS 5000.1 Build 810
BP
by
BP Coil
Tubing Report
Company: North America - ALASKA - BP
Local C"rdlnate Reference: Well 15-27
Project: PBU
TVD Reference:
Mean Sea Level
Site: 15
MD Reference:
RT @ 60.35usft (15-27A)
Well: 15-27
North Reference:
True
Wellbore: PLAN 15-278
Survey Calculation Method:
Minimum Curvature
Design: 15-27B WP05
Database:
EDM R5K - Alaska PROD - ANCP7
Targets
Target Name
- hit/miss target Dip Angle Dip Dir.
TVD
+N/ -S
+E/ -W
Northing
Easting
-Shape (°) (°)
(usft)
(usft)
(usft)
(usft)
(usft) Latitude
Longitude
15-27B Polygon 0.00 0.00
0.00
9,237.57
-1,093.85
5,970,366.000
674,658.000 70° 19'28.973 N
148° 35' 1.149 W
- plan misses target center by 8705.73usft at 16536.00usft MD
(8666.27 TVD, 9555.38 N. -329.31 E)
- Polygon
Point 1
0.00
0.00
0.00
5,970,366.00
674,658.00
Point
0.00
696.54
499.48
5,971,074.00
675,141.00
Point
0.00
657.23
981.72
5,971,046.00
675,624.00
Point
0.00
255.66
1,000.33
5,970,645.00
675,652.00
Points
O.DO
-74.29
1,121.64
5,970,318.00
675,781.00
Point
0.00
-571.35
1,416.10
5,969,828.00
676,087.00
Point
0.00
-833.91
1,307.92
5,969,563.00
675,985.00
Point
0.00
-1,135.74
1,381.87
5,969,263.00
676,066.00
Point
0.00
-1,213.21
631.81
5,969,168.00
675,318.00
Point 10
0.00
-142.71
241.74
5,970,229.00
674,903.00
Point 11
0.00
0.00
0.00
5,970,366.00
674,658.00
15-27B Fault 4 0.00 0.00
0.00
10,469.75
-955.95
5,971,601.000
674,767.000 70° 19'41.092 N
148' 34'57.128 W
- plan misses target center by 8736.87usft at 16536.00usft MD
(8666.27 TVD, 9555.38
N. -329.31 E)
Polygon
Point 1
0.00
0.00
0.00
5,971,601.00
674,767.00
Point
0.00
-431.01
-646.31
5,971,155.00
674,131.00
Point
0.00
-974.63
-1,268.25
5,970,597.00
673,522.00
Point
0.00
-431.01
-646.31
5,971,155.00
674,131.00
15-27B T1 0.00 0.00
8,694.00
8,787.06
-182.09
5,969,937.000
675,580.000 70' 19'24.543 N
148° 34'34,536 W
- plan misses target center by 30.39usft at 15732.93usft MD (8693.73 TVD, 8773.76
N, -209.42 E)
- Point
15-27B Fault 1 0.00 0.00
0.00
8,804.86
339.50
5,969,967.000
676,101.000 70' 19'24.718 N
148'34'19.313 W
- plan misses target center by 8696.70usft at 15175.32usft MD
(8689.28 TVD, 8461.06
N, 235.27 E)
-Polygon
Point 1
0.00
0.00
0.00
5,969,967.00
676,101.00
Point
0.00
-662.36
432.64
5,969,315.00
876,549.00
Point
0.00
-1,250.73
738.96
5,968,734.00
676,869.00
Point
0.00
-662.36
432.64
5,969,315.00
676,549.00
15-27B Fault 5 0.00 0.00
0.00
7,618.34
-1,491.90
5,968,738.000
674,298.000 70° 19' 13.047 N
148° 35' 12.758 W
- Plan misses target center by 8861 74usft at 15628 48usft MD (8694.17 TVD 8687.55 N -150.77 E)
3222019 2:17:09AM
Page 5
COMPASS 5000.1 Build 810
BP
BP Coil Tubing Report
Company: North Amedce- ALASKA - BP
5,968,738.00
500.77
Project: PBU
964.81
5,969,080.00
Site: 15
5,968,946.00
Well: 15-27
Wellbore: PLAN 15-27B
Design: 15-278 WP05
- Polygon
Point 1
0.00
0.00
Point 2
0.00
198.34
Point 3
0.00
319.52
Point 4
0.00
196.34
15-27B Fault 2 0.00 0.00
0.00
7,201.62
- plan misses target center by 8744.58usft at 14371.90usft MD (6654.48 TVD, 8058.81
N, 897.53 E)
- Polygon
Point 1
0.00
0.00
Point 2
0.00
275.35
Point 3
0.00
620.62
Point
0.00
275.35
15-27B T2 0.00 0.00
8,666.00
9,556.65
- plan misses target center by 5.35usft at 16536.00usft MD (8666.27 TVD, 9555.38 N,
-329.31 E)
Point
15-27B Fault 3 0.00 0.00
0.00
8,174.60
- plan misses target center by 8821.97usft at 14371.90usft MD (8654.48 TVD, 8058.81
N, 897.53 E)
Polygon
Point 1
0.00
0.00
Point 2
0.00
1,743.60
Casing Points
Measured
Depth
(usft)
16,536.00
Vertical
Depth
(usft)
8,666.27 27/8"
Name
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
0.00
5,968,738.00
500.77
5,968,946.00
964.81
5,969,080.00
500.77
5,968,946.00
-15.18 5,968,356.000
0.00
5,968,356.00
1,440.94
5,968,665.00
3,142.60
5,969,050.00
1,440.94
5,968,665.00
-324.12 5,970,703.000
2,604.51 5,969,390.000
0.00 5,969,390.00
-1,708.75 5,971,093.00
Casing Hole
Diameter Diameter
(in) (in)
2.875 4.250
Well 15-27
Mean Sea Level
RT @ 60.35usft (15-27A)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP7
674,298.00
674,794.00
675,255.00
674,794.00
675,784.000
675,784.00
677,218.00
678,911.00
677,218.00
675,420.000
678,380.000
678,380.00
676,631.00
70" 19'8.950 N 148" 34'29.664 W
70° 19'32.112 N 148' 34'38.682 W
70'19'18.515N 148°33'13.212W
3222019 2:17:09AM Page 6 COMPASS 5000.1 Build 81D
F ee
Company:
Project:
Site:
Well:
Wellbore:
Design:
Formations
Plan Annotations
North America - ALASKA - BP
PBU
15
15-27
PLAN 15-27B
15-27B VVP05
Measured
Depth
(usft)
11,576.89
12,010.30
11,857.82
11,874.29
11,986.62
12,177.64
12,142.60
12,254.22
Measured
Depth
(usft)
14,371.90
14 400.00
14,420.00
14,460.00
14,570.11
14,870.00
15,150.00
15,350.00
16,050.00
16,330.00
16,536.00
BP
BP Coil Tubing Report
Vertical
Depth
(usft) Name Lithology
8,244.00 TSAD
8,567.00 22P
8,470.00 26N
8,481.00 26P
8,552.00 22N
8,644.00 PGOC
8,632.00 7000
8,685.00 TDF
Vertical
Local Coordinates
Depth
+N/ -S
+El -W
(usft)
(usft)
(usft)
Comment
8,654.48
8,058.81
897.53
TIP
8,656.40
8,082.65
882.79
KOP
8,657.93
8,099.50
872.11
Start DLS 12.00TFO-140.00
8,662.73
8,132.22
849.63
Start DLS 12.00 TFO-60.00
8,673.06
8,213.75
776.72
Start DLS 12.00 TFO -90.00
8,682.85
8,336.06
508.47
Start DLS 12.00 TFO 89.00
8,688.92
8,445.27
255.06
Start DLS 12.00 TFO -90.50
8,691.98
8,538.80
79.96
Start DLS 12.00 TFO 88.50
8,688.49
9,081.20
-257.79
Start DLS 12.00 TFO -86.00
8,676.49
9,355.07
-289.92
Start OLS 12.00 TFO 92.00
8,666.27
9,555.38
-329.31
TO at 16536.00
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Dip
Dip Direction
Well 15.27
Mean Sea Level
RT @ 60.35usft (15-27A)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Checked By: Approved By: Date: I
3/222019 2: 17:09AM Page 7 COMPASS 5000.1 Build 81D
North America - ALASKA - BP
PBU
15
15-27
PLAN 15-27B
15-27B WP05
Anticollision Summary Report
22 March, 2019
Company:
North Amedw- ALASKA -BP
Project:
PBU
Reference Site:
15
Site Error:
O.00usft
Reference Well:
15-27
Well Error:
O.00usft
Reference Wellbore
PLAN 15-278
Reference Design:
15-27B WP05
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 15-27
Mean Sea Level
RT @ 60.35usft (15-27A)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
15-27B WP05
MWD
Filter type:
NO GLOBAL FILTER'. Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
14,371.90 to 16,536.00usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,850.96usft Error Surface:
Elliptical Conic
Survey Tool Program Date 3/22/2019
From To
(usft) lush) Survey(Wellbom) Tool Name Description
431.35
3,440.35 15-27 Srvy 1 MWD (15-27)
MWD
MWD- Standard
3,705.00
4,213.00 15-27AP61 Srvy 1 GYD GC SS (15-27AP
GYD-GC-SS
Gyrodata gyro single shots
4,307.01
11,405.1715-27AP81 Srvy 2 MWD+IFR+MS (1 5-27A
MWD+IFR+MS-WOCA
MWD + IFR +Multi Station W/O Crustal
11,445.70
11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS (15-27A
MWD+IFR+MS-WOCA
MWD + IFR +Multi Station W/O Crustal
11,926.82
14,371.9015-27A Srvy1 MWD+IFR+MS(15-27A)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
14,371.90
16,536.00 15-27B WP05 (PLAN 15-27B)
MWD
MWD - Standard
322/2019 12:46.23AM Page 2 of 4 COMPASS 5000.1 Build 81D
BP
by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 15-27
Project:
PBU
TVD Reference:
Mean Sea Level
Reference Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Site Error:
O.00usft
North Reference:
True
Reference Well:
15-27
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN 15-27B
Database:
EDM R5K-Alaska PROD -ANCP7
Reference Design:
15-27B WPO5
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
15
15-05 - 15-05 - 15-05
Out of range
15-05 - 15-05A - 15-05A
Out of range
15-05 - 15-05APB1 - 15-05APB1
Out of range
15-05 - 15 -OSB - 15-05B
Out of range
15-05 - 15-05BPBI - 15-OSBPBI
Out of range
15-18 - 15-18 - 15-16
Out of range
15-18 - 15-18A- 15-18A
Out of range
15-21 - 15-21 - 15-21
Out of range
15-21 - 15-21 A - 15-21A
Out of range
15-22 - 15-22 - 15-22
Out of range
15 -27 -15 -27A -15-27A
14,671.90
14,700.00
80.16
1.50
80.16
Pass-NOERRORS
15-28-15-28B-15-288
14,996.90
12,125.00
1,643.50
176.84
1,476.11
Pass - Major Risk
15-28 - 15-28BPB1 - 15-28BPB7
Out of range
15-28 - 15-28BPB2 - 15-28BPB2
14,996.90
12,100.00
1,663.35
177.20
1,498.16
Pass -Major Risk
15-29 - 15-29 - 15-29
15,821.90
12,950.00
988.98
351.27
637.52
Pass - Major Risk
15-29 - 15-29A- 15-29A
14,921.90
12,675.00
790.12
175.03
628.23
Pass - Major Risk
15-29 - 15-29APB1 - 15-29APB1
15,021.90
12,356.00
981.42
198.68
792.11
Pass- Major Risk
15 -29 -15 -29B -15-29B
16,536.00
14,250.00
1,169.04
333.61
834.50
Pass - Major Risk
15-29 - 15-29BPB1 - 15-29BPB1
Out of range
15-33 - 15-33 - 15-33
Out of range
15-33 - 15-33A- 15.33A
Out of range
15-33 - 15-33B - 15-33B
Out of range
15-33 - 15-33C - 15-33C
Out of range
15-33 - 15-33PB1 - 15-33PBI
Out of range
15-33 - 15-33PB2 - 15-33PB2
Out of range
15-45 - 15-45 - 15-45
Out of range
1545 - 15-45A- 1545A
Out of range
15-45 - 15-45APB1 - 1545APB1
Out of range
1545 - 15-45AP82 - 1545APB2
Out of range
1545 - 1545C - 1545C
Out of range
15-45 - 1545CPB1 - 1545CPB1
Out of range
1546 - 1546 - 1546
Out of range
15-46 - 154611 - 15461-1
Out of range
1546-154611 PB1-15461.1 PB7
Out of range
K
K-10 - K-1 OC - K-1 OC
Out of range
K-1 0 - K-1 OD - K-1 OD
16,307.47
14,475.00
714.39
299.87
419.30
Pass -Major Risk
312212019 12:46:23AM Page 3 of COMPASS 50001 Build 81D
as
Company:
North America- ALASKA - BP
Project:
PBU
Reference Site:
15
Site Error:
0 0ousft
Reference Well:
15-27
Well Error:
0.o0usft
Reference Wellbore
PLAN 15-27B
Reference Design:
15-278 WP05
BP
Anticollision Report
Local Co-ordinate Reference:
Well 15-27
TVD Reference:
Mean Sea Level
MD Reference:
RT @ 60.35usft (15-27A)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP7
Offset TVD Reference:
Offset Datum
Reference Depths are relative to RT @ 60.35usft (15-27A) Coordinates are relative to: 15-27
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK
Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.34°
1800-
,1350-
0
800-
,1350-
O
TU
n
Ulu 900-
(2
c
d
U
0
C
w 450-
0
0
Q$ K-10, K -10D, VO
-8- 1505,1505B,15-05BVO
Ladder Plot
15-05,1505APB1, 15-05APB1 V2
-� 154D5,1505BPB1, 1505BPB1 VO
1505,1505A., 15405AV2
43- 1516,15168, 15-16BVO
$ 1516,1516CPB2,1516CPB2VO
$ 15-16,1516BPB1, 1516BPB1 VO
--)F 1516,15-16C, 15-16C VO
-Ar 1516,1516A, 15-16A V3
-1t- 1516,1516,1516V5
$ 1516,1516CPB1, 1516CPB1 VO
� i�1, 1a 1, 10- I v i T Isaa, IS3Jl., ictoo,-w I
60& 1541,1541AMVIAV2 12WO 1533,1533P9§,Q@3PB2 V1 18000
$iI�QW, '61$4f�BID,ttS( W n}� 15-03,1543,1543V1
-Ar 15-05,15-006WB1, 150aAM1 V2
-I- 1506,15064, 15-06A V4
$ 15-06,15-06,15-0BV1
$ 15-17,15-17,15-17V4
15-18,1518A, 15-18A V4
- 1518,1518,1518V1
-� 15-21,1521A, 15-21AV7
♦- 1521,15-21,1521 V6
$ 1522,1522,15-222 V1
$ 1527,15-27A, 1S-VAVO
$ 1546,154611PB1, 15461-1 PB1 V1
$ 15-06,154611,154611 W
$ 1549,1549A,1549A V5
-)E- 1549,1549APB1, 1549APB1 V2
-I- 1549,1549PB1, 15.49PB1 V1
-I- 1549,1549C, 15-49CVO
$ 15-49,15-49,15-49\/2
$ 1549,15496,15496 VO
$ 1519,1519,1519\12
-X- 1519,1519A, 1519AV2
3222019 12:46:23AM Page 4 of 4 COMPASS 5000 1 Build 81D
1
1
I
I
I
I
I
I
1
I
I
I
I
I
i
I
I
I
I
I
I
I
1
I
1
1
I
1
I
I
I
1
1
1
I
I
I
I
1
I
I
_1
I
I
I
I
I
I
I
I
I
1
�
I
I
1
I
I
I
I
I
I
I
1
I
I
I
I
K-10,K-10C,K
K-10,K-10DPB
1
I
I
GCVO
,K-10DPB1V0 +3-
I
:LEGEND
I
1545,1545BP
1545,1545AP
I
I
I
,1545BPB1 V3
,15-05APB1V3
I I
I I
I
1533,'1533B, 5-33BV2
15-33,(1533A, 533AV2
15-05,1505APB1, 15-05APB1 V2
-� 154D5,1505BPB1, 1505BPB1 VO
1505,1505A., 15405AV2
43- 1516,15168, 15-16BVO
$ 1516,1516CPB2,1516CPB2VO
$ 15-16,1516BPB1, 1516BPB1 VO
--)F 1516,15-16C, 15-16C VO
-Ar 1516,1516A, 15-16A V3
-1t- 1516,1516,1516V5
$ 1516,1516CPB1, 1516CPB1 VO
� i�1, 1a 1, 10- I v i T Isaa, IS3Jl., ictoo,-w I
60& 1541,1541AMVIAV2 12WO 1533,1533P9§,Q@3PB2 V1 18000
$iI�QW, '61$4f�BID,ttS( W n}� 15-03,1543,1543V1
-Ar 15-05,15-006WB1, 150aAM1 V2
-I- 1506,15064, 15-06A V4
$ 15-06,15-06,15-0BV1
$ 15-17,15-17,15-17V4
15-18,1518A, 15-18A V4
- 1518,1518,1518V1
-� 15-21,1521A, 15-21AV7
♦- 1521,15-21,1521 V6
$ 1522,1522,15-222 V1
$ 1527,15-27A, 1S-VAVO
$ 1546,154611PB1, 15461-1 PB1 V1
$ 15-06,154611,154611 W
$ 1549,1549A,1549A V5
-)E- 1549,1549APB1, 1549APB1 V2
-I- 1549,1549PB1, 15.49PB1 V1
-I- 1549,1549C, 15-49CVO
$ 15-49,15-49,15-49\/2
$ 1549,15496,15496 VO
$ 1519,1519,1519\12
-X- 1519,1519A, 1519AV2
3222019 12:46:23AM Page 4 of 4 COMPASS 5000 1 Build 81D
am
A'p10G;
WELL DETAILS: 1527
WELLBORE DETAILS: PIAN 15.Z78
REFERR INFOFWTJON
pm WTm Nm6
Mepnm
fBB
Site: 76
GmI 32.20
Inc
CoVeira(TVD): WMn S27Tma N9M
da Fia.
Wap: 7627
Norbinl:
Nastin9: 5961157.100
PererHieonMe: 16271
VSe*n VDI: MaaaOea Level
s�reMqAne 819
WNbeFx PIAN 16278
9:875007581
Tie an MD: 14371.90
Se49n NSC Sbt.(6G.M O.
DqAqIe
Daaipn: 1621BWPofi
attitu
Lapitu0e: 70° 1 '29. N
LOngiWOe: 140'34'29.222 W
2 1440040
Mmwmtl Oew MT ..351a8(15 T/A)
16
CekUgun MNkd', Mii.remCuvgum
I GIM,
Mo4eI:pGGM201
saW
sane
69aE
Bsz9
8560
SON
SECTIONOETAILS
ANNOTATIONS
Sac MD
Inc
Azi nTVD
4WS
4EFW
DIeg
TFwe VSW Ta"
TVD MD Anna n
1 14371.90
85.84
328.34 8654.48
8068.81
89253
0.00
0.00 7265.83
8654.48 14371.90 TIP
2 1440040
86.31
328.22 0656.40
808265
86279
173
-1429 729328
865640 1440000 KOP
3 14420.2
64.93
327.06 8657.93
8099.50
872.11
9.00
-14040 731276
865793 1442000 Stan DIS 12.ODTFO-140.00
4 1446040
81.26
323.94 8662.73
813222
84963
1200
-14000 7351.19
866273 14460.00 Stmt OLS 12.00TF040.00
11457011
88.00
312.52 8673.06
8213.75
776.72
12.00
E00D 7452.74
867306 14570.11 Start OLS 12.00TFO-90.00
6 74870.00
88.38
276.51 868285
833606
508.47
1200
.90.00 765943
868205 14070.06 Stat DLS12.007089.00
7 1515000
89.21
310.11 868092
8W5.27
25606
1200
89.06 784872
868B92 15150.00 Siert OLS 12.00 TFO-90.50
6 1535000
89.07
286.11 869148
9538.80
7996
12.00
-9050 799650
8691.98 15350.00 Start OLS 1200TFO88..50
91065000
9739
10.08 868B49
9081.20
-257.79
1210
88.50 8621.71
868&49 16050.00 Sten OLS 12.00TF0�86.00
10 76330.00
9337
336.51 867649
935607
-289.92
1200
8600 8890.05
867649 16330.00 Sten DLS 12.00TFO92.W
11 1653640
92.23
1.23 866627
9555.38
32931
1200
92.00 9091.75
866627 76536.00 1Dg 16536.06
saW
sane
69aE
Bsz9
8560
SON
-1900 -1200 -1000 -800 -600 dW -200 0 200 000 -W- 800 1000 1200 1400 1600 1800 2000 22W
West( -)/East(+) (200 usft/in)
III■■■`�CJiT:IRVP_ti�■■■■■■■
1-7
5
I\■■\\
■_■■■■■
\■
I■\■■���■`r
WIMM■■■■■■
■\\■■S
.: , iiWNL
US.
MEN
■■■��_ww
ism
MEN
■■1_��i■■■�\,�i�■
■■■■
-1900 -1200 -1000 -800 -600 dW -200 0 200 000 -W- 800 1000 1200 1400 1600 1800 2000 22W
West( -)/East(+) (200 usft/in)
55W 5600 5706 5800 5900 6060 6106 6206 6306 WW 6506 6600 6706 68W 6900 7000 7106 7206 7300 7906 75W 7600 "M 7800 7900 8006 8106 6206 8306 9406 8506 8600 8700 8806 8900 9006 91W 9206 9300 9906
Vertical Section at 340.00° (100 usft/in)
1-7
5
5-279
I
OP
1S21 3TI
tMD SI2 TFO- 000
S DLsI OD
89
.D
S12
TFO-
W
M165
00
DL 12W FO
6
W
DLS I
W TF `903
Sten LSI
WTF
88.50
Lev
55W 5600 5706 5800 5900 6060 6106 6206 6306 WW 6506 6600 6706 68W 6900 7000 7106 7206 7300 7906 75W 7600 "M 7800 7900 8006 8106 6206 8306 9406 8506 8600 8700 8806 8900 9006 91W 9206 9300 9906
Vertical Section at 340.00° (100 usft/in)
PMJW: POU
Bill 16
ANTFCOLLISM SETTINGS
COMMNY DETAILS: Nwm America-ALASI(A-B+
Merponlonmamul. wjfflerval:2500
CNwlaEcnMmoo Min roulcurnbre
Well: 16.27
DepM Range Fmm: 1437100 To 16536.00
Ermr Syebm: ISCWSA
3400.35
Raub Lnuad By Centre Dlownce: 185006
San Ma iod Trav CyMOer None
IAh6bon: PLAR15.27B
Redolence'PWAS-27BWP05(1527/PlAN1S27B)
Enor Surtax: 810alConic
Plan: 16-27OWP06
W
YArnhg MMoO. Runs Bostic!
Ladder Plat
x116 wt¢, Fittw
I'll Il i'll 1 IlsrM
SURVEYPROGRM4 Nam Amerke-ALASWI-0o
Hruw
DepM Tc
g
Tool
431.35
3400.35
K.10 K.11IIIllll -l0F4ElIW
q vN
Ii }WgtY
370500
rGµ HmW new
15-27APB1 Billy 1 GYD GC SS(1S27APB1)
K-10 K,1M -Will++sq+YYgrsc-BW�
W
11405.17
-RKIlli .6eI
n
11445.70
+�sb,�u iscvr w�q w�ev
saw Haxn
M lfflrMS-WOCA
11826.82
14371.80
r Asn Hme�. Hmre�w +
~+JPR•MSiV%MA
_ _ 1437100
16536.00
15-27B WP05 (PLMI 16276)
a H46sK r>vw +Iso.rsux, e6rvrle
�
n
+Hq �eorem, �sbsm va r
+rsna ram
r iso Hmet rs
>aq fanw
n
ny
11x6 aaew
nw�}s¢w
+�saa
r.a, oma rsecw
+we. H+x.wmw�
rna Hee+e�nese+w +na. Asn. saw
«sn r>ay.navw
+�>a nn. Hnve
From Colour To MD
14372 14650
14650 14800
14800 16536
SURVEYPROGRM4 Nam Amerke-ALASWI-0o
Depm Fmon
DepM Tc
SurveyPMn
Tool
431.35
3400.35
15-27 Srvy 1 MWD (15-27)
MWD
370500
421300
15-27APB1 Billy 1 GYD GC SS(1S27APB1)
GYD-Gl
4307.01
11405.17
15-27AP91 Smy 2 AM -IM-MS(16.27APB1)
MYrDNFR-MSW9CA
11445.70
1188811
15-27APB1 Sr13' 3 MM-IFR>M(15-27AP01)
M lfflrMS-WOCA
11826.82
14371.80
15.27ASrvy 1 MWD•IFR•10S(1537A)
~+JPR•MSiV%MA
_ _ 1437100
16536.00
15-27B WP05 (PLMI 16276)
MWD
am
WELL DETAILS: ANTICOLLISION SETTINGS COMPANY DETAILS: NmmA-ALASIU-BP
PWjod: PBU
Sb9: 16 GmumJ Lnel: 32.20 utnpolB MBMW: MD,YbrvaL25W CalculaOonflemiud Mirlmum Curvature
Well: 16-27 Numbing: 5961157.180 Dem Rena From: 1437180 To 16536.00 Rmr Spmm: ISCWSA
Wellbore: PLAN16.278 Eeseng: 675967.79➢ RnMb Limial By: Centre➢stance: 1850.96 Sun MBMW: Tree Cylinder NOM
Plan: 16-27BWPO6 L8811We70' 1T 58.123 N Reference: 15270 WP05 Error Surface: EIIiPBcalConm
Longitude'. 1413' 34.29.222 W Warning MMhod: Ruin BUM
Depth Range: 14371.90 To 16536.00
Sl9NVE1MOGRAM
Degn From DeuM To SbveM.n Tod
431.35 3440.35 IiV 8rvy 1 MWD (1i27) MM
370500 421300 1S27APBt Srvy 1 GTD GC SS(1S27MB1) M_3G B
43W.01 11405.17 152TN91 SIvy 2 MWD+IM.MB(1537MB1) MWDNFR+MAWCGA
11445.70 1189641 1S27p 1SM3MW +IFR+MS (1S27M81) 81ND+IFR+MS0CCA
119M82 14371.90 159ASrvy 1 MMAM+MS(1S27A) MND+I1FIR+M54MOOA
14371.90 165M 00 15278 WF115(PLAN 15-278) MWD
14371.90 To 16536.00
A2imum from NCM1.1K centre W centre senernon IM Muni
ISP, IS0.l 15AeN ISR I1YPe1. 11 ISm.1 ., 1.. V4 19A I19I.W IYR 119191, 11 .1 ISY ISYLIPB+ I14mm"1111¢111¢. ISI. Vt "Int. NAS
Iiq ISR 116PNK IW ISP iY 1 W 159159. IS9 VIISR ISYl1, ISY.I N S1M 1YIM V!
YD 1
ISR.ISP.SR 1515&91, IS 1yva 1YID. 1326 yS'1111
iMN 159Il1159&
Y1R SIIA S1I. 11a .IQ IiSS,SSW9. NV[
111
SRY ISYA IS�1Y1
eK
I�nl
1N 1Y$RA1, 1S]M�N
1
ISPIS11IOIµ11SEBYO 1S11P1. N 1531. 11211 . "..I4lOSAIMK
11 S 151 . IYW IMK I'll. 1,u. ISA SA1ISO R IY V, ".. SYIY
ISO3108,R0m1 ➢ Su,1S..11Ie91 11R,SY5W 1,0, ISYI.1YK 11A".. SY 1Y. iY VVI
1SY.1SYaI5�Y 1Sm, ISu. ISU V1
SECTION DETAILS
Sec
MO
Inc
ft
TVD
+WB
+EI -W
Deg
TFeu VSM
1
1437180
M84
320.34
8854.40
8058.81
897.53
O. W
0,00 7265.03
2
144W00
66.31
32822
WMA0
MR 65
602.79
1.73
-14.28 ]2133.20
3
1442000
U93
32].06
%57.93
0099.50
072.11
9.00
-140.M 731276
4
1446000
81.26
32394
W6273
013232
049.63
12,00
-140.00 7351.19
5
14570.11
80.00
312.52
W7386
021375
77812
12.00
BOW 74U 74
6
14870.00
0836
276.51
8588.05
SON
50647
1200.
4 OO 709,43
7
15150.00
0921
310.11
W80.92
844527
255.06
12.00
89.00 784672
0
15350.00
8907
288.11
0691.98
8538.80
79.98
1200
40.50 7886.50
9
1605000
91.39
10,00
8580.49
9061.20
-257,79
12.00
88.50 W2171
1D
1633000
8337
335.51
WIS 49
9355,07
-28992
1200.
MDO 889005
Sl9NVE1MOGRAM
Degn From DeuM To SbveM.n Tod
431.35 3440.35 IiV 8rvy 1 MWD (1i27) MM
370500 421300 1S27APBt Srvy 1 GTD GC SS(1S27MB1) M_3G B
43W.01 11405.17 152TN91 SIvy 2 MWD+IM.MB(1537MB1) MWDNFR+MAWCGA
11445.70 1189641 1S27p 1SM3MW +IFR+MS (1S27M81) 81ND+IFR+MS0CCA
119M82 14371.90 159ASrvy 1 MMAM+MS(1S27A) MND+I1FIR+M54MOOA
14371.90 165M 00 15278 WF115(PLAN 15-278) MWD
14371.90 To 16536.00
A2imum from NCM1.1K centre W centre senernon IM Muni
ISP, IS0.l 15AeN ISR I1YPe1. 11 ISm.1 ., 1.. V4 19A I19I.W IYR 119191, 11 .1 ISY ISYLIPB+ I14mm"1111¢111¢. ISI. Vt "Int. NAS
Iiq ISR 116PNK IW ISP iY 1 W 159159. IS9 VIISR ISYl1, ISY.I N S1M 1YIM V!
YD 1
ISR.ISP.SR 1515&91, IS 1yva 1YID. 1326 yS'1111
iMN 159Il1159&
Y1R SIIA S1I. 11a .IQ IiSS,SSW9. NV[
111
SRY ISYA IS�1Y1
eK
I�nl
1N 1Y$RA1, 1S]M�N
1
ISPIS11IOIµ11SEBYO 1S11P1. N 1531. 11211 . "..I4lOSAIMK
11 S 151 . IYW IMK I'll. 1,u. ISA SA1ISO R IY V, ".. SYIY
ISO3108,R0m1 ➢ Su,1S..11Ie91 11R,SY5W 1,0, ISYI.1YK 11A".. SY 1Y. iY VVI
1SY.1SYaI5�Y 1Sm, ISu. ISU V1
L$
AOGCC Spider Plot
Easting (200 usfn)
WELLBORE DETAILS: P 1S2119 ISfE18CVFCH Tm
Sib: 16
xgi.x n
coa¢�.e1xElwkex• xxltsn.imwn
15S2113llltfl:
16,27
A
6WmE F 1&m
Wsvu15-27Au�u
W OM.OWE)
Design: l6 IW061%.SO0RMD
�,�
TW on MD: 14371.90 bifiee� My
gey�., MF®evvcu
AOGCC Spider Plot
Easting (200 usfn)
by
North America - ALASKA - BP
PBU
15
15-27
PLAN 15-27B
15-27B WP05 Plus 500ft MD
AOGCC Offset Well Report
22 March, 2019
by
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
15
Site Error:
O.00usft
Reference Well:
15-27
Well Error:
O.00usft
Reference Wellbore
PLAN 15-27B
Reference Design:
15-276 WPO5 Plus 500ft MO
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 15-27
Mean Sea Level
RT Q 60.35usft (15-27A)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference
15-27B WP05 Plus 500ft MD
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center, distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 3/22/2019
From
To
lush)
(usft) Survey (Wellbore)
Tool Name
Description
431.35
3,440.3515-27 Srvy1 MWO(15-27)
MWD
MWD - Standard
3,705.00
4,213.00 15-27APB7 Srvy 1 GYD GC SS (15-27AP
GYD-GC-SS
Gyrodam gyro single shots
4,307.01
11,405.1715-27APB7 Srvy 2 MWD+IFR+MS(15-27A
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
11,445.70
11,898.41 15-27APB1 Srvy 3 MWD+IFR+MS(15-27A
MWD+IFR+MS-WOCA
MWD+IFR +Multi Station W/O Crustal
11,926.62
14,371.9015-27A Srvy1 MWD+IFR+MS (1 5-27A)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
14,371.90
17,038.0015-27B WPOS Plus 50011 MID (PLAN 15-27
MWD
MWD - Standard
3/222019 2.19: 17AM Page 2 of 3 COMPASS 5000.1 Build 81D
BP
bp Anticollision Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 15-27
Project:
PBU
TVD Reference:
Mean Sea Level
Reference Site:
15
MD Reference:
RT @ 60.35usft (15-27A)
Site Error:
O.00usft
North Reference:
True
Reference Well:
15-27
Survey Calculation Method:
Minimum Curvature
Well Error:
0 oousft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN 15-278
Database:
EDM RSK- Alaska PROD -ANCP7
Reference Design:
15-27B WPOS Plus 500ft MD
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
15
15-17-15-17-15-17
3,874.28
3,950.00
122.41
15-18 - 15-18 - 15-18
2,090.38
2,125.00
163.14
15 -18 -15 -18A -15-16A
2,090.38
2,125.00
163.14
15-19 - 15-19 - 15-19
4,045.68
4,050.00
164.61
15 -19 -15 -19A -15-19A
4,045.68
4,050.00
164.61
15-21 - 15-21 - 15-21
1,365.32
1,375.00
30.22
15 -21 -15 -21A -15-21A
1,347.95
1,350.00
29.92
15-22 - 15-22 - 15-22
392.50
400.00
63.86
15-27 - 15-27 - 15-27
4,118.56
4,125.00
1.60
15-27 - 15-27A- 15-27A
14,672.29
14,700.00
80.16
15-27 - 15-27APB1 - 15-27APB1
12,202.02
12,225.00
64.62
15-27 - PLAN 15.278 - 15-27B
26.36
26.36
0.00
15-27 - PLAN 15-278 - 15-27B WPOS
16,536.00
16,536.00
0.00
15-28 - 15-28 - 15-28
716.74
725.00
121.43
15-28 - 15-28A- 15-28A
715.74
725.00
121.43
15-28 - 15-288 - 15-28B
13,252.91
13,750.00
77.67
15-28 - 15-28BPB1 - 15-28BPB1
716.74
725.00
121.43
15-28 - 15-28BPB2 - 15-28BPB2
716.74
725.00
121.43
15-29 - 15-29 - 15-29
241.91
250.00
181.55
15-29 -15-29A- 15-29A
241.91
250.00
181.55
15.29 - 15-29APB1 - 15-29APB1
241.91
250.00
181.55
15-29 - 15-298 - 15-29B
247.71
250.00
181.70
15-29 - 15-29BPB1 - 15-29BPB1
247.71
250.00
181.70
15-33 - 15-33 - 15-33
2,875.53
2,900.00
124.71
15 -33 -15 -33A -15-33A
2,875.53
2,900.00
124.71
15.33 -15 -33B -15-33B
2,875.53
2,900.00
124.71
15-33 - 15-33C - 15-33C
2,875.53
2,900.00
124.71
15-33 - 15-33PB1 - 15-33PB1
2,875.53
2,900.00
124.71
15-33 - 15-33PB2 - 15-33PB2
2,875.53
2,900.00
124.71
15A4 - 15-44 - 15-44
1,628.91
1,650.00
189.66
15-45 - 15-45 - 15AS
1,447.96
1,475.00
190.76
15-45 - 15-45A- 1 SASA
1,447.96
1,475.00
190.76
15A5 - 15-45APB1 - 15d5APB1
1,447.96
1,475.00
190.76
15AS - 15-45APB2 - 15d5APB2
1,447.96
1,475.00
190.76
15A5 - 15-456 - 15<5B
1,447.96
1,475.00
190.76
15-45 - 15-45BPBI - 15A5BPB1
1,447.96
1,475.00
190.76
15A5 - 15-45C - 15-45C
1,44296
1,475.00
190.76
15A5 - 15-45CPB1 - 15-45CPB1
1,447.96
1,475.00
190.76
15<5 - 15-45D - 15-45D
1,447.96
1,475.00
190.76
15-45 - 15-45DPB1 - 15A5DPB7
1,447.96
1,475.00
190.76
15-45 - 15-45PB1 - 15-45PB1
1,447.96
1,475.00
190.76
15AB-15-46-1546
1,720.89
1,750.00
92.02
15-46 - 15-46L1 - 15-46L1
1,720.89
1,750.00
92.02
1 SAS -15-46L1 PB1-15-46L1 P81
1,720.89
1,750.00
92.02
K
3/22/2019 2 19:17AM Page 3 of 3 COMPASS 5000.1 Build 81D
Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17
Quick Test Sub to Otis 1.1 ft -- —
Top of 7" Otis 1 0.0 ft
4 COR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
7-1116" 6x Flange x 7.Olis Box
Top of Annular 6.0 ft
lirll 7 1118
Top of Annular Element 6.7ft Annular
Bottom Annular
C1 Blind/Shears 9.3ft
Ci 2-3/8" Pipe/Slips 10.1 ft
B1 L B2 BS 14 Choke Line
Kill Line
C 2-3/8" x 3-1/2" VBRs 12.6 ft
CL 2-3/8" Pipe/Slips 13.4 ft
CL Of Top Swab 16.0tt
�— Swab Test Pump Hose
i T1 i T2
CL of Flow Cross 17.4 ft
Master
CL of Master 18.8 ft
LD�----S O
IA
OA
LDS O
Ground Level
0
Remark:
AOGCC
PTD No. 219-045 Coordinate Check
28 March 2019
INPUT
Geographic, NAD27
PBU 15-27A
Latitude: 70 17 58.12300
Longitude: 148 34 29.22200
OUTPUT
Stale Plane, NAD27
5004 -Alaska 4, U.S. Feet
1/1
NorthingN. 5961157.198
EastinglX: 675967.784
Convergence: 1 20 30.57409
Scale Factor: 0.999935175
Corpscon v6.0.1, U.S. Army Corps of Engineers
TRANSMITTAL LETTER CHECKLIST
WELL NAME: 4'S/V 2r ,7
PTD: � 19 — 0
✓ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50 -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-_
-� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company_Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company– Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Namel must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150
Well Name: PRUDHHOE BAY UNIT 15-2713 — Program DEV _ Well bore seg ❑
PTD#.2190450 Company BP EXPLORATION (ALASKA) INC.__-_ _ _ Initial Class/Type
DEV/PEND GeoArea 690 _ ----Unit EU-- On/Off Shore O4 Annular Disposal ❑
Administration
1
Permit fee attached. _ _ _ _ _ _ _ _ _
NA.
Date .
Commissioner Date
12
Lease number appropriate
Yes
_ Surface Location lies within ADL0028306; Top Prod Int & TD lie within ADL0028303.....
I'I3
Unique well. name and number ........ _ _
Yes
......... . .
i4
Well located in. a_defined pool.. . . . . . .........
Yes
_ PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 3410 .................... _ _ _
5
Well located proper distance from drilling unit boundary . . . . ....... . . . .
Yes
CO 3416, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be
6
Well located proper distance from other wells_ ....
Yes
_ _ opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO
7
Sufficient acreage available in.drilling unit _ _ _ _
Yes
3410, Rule 2..
8
If deviated, is wellbore plat included _
Yes
9
Operator only affected party- - - - - - - - - - - --- - - - -
Yes
-
10
Operator has. appropriate bond in force _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
11
Permit can be issued without conservation order .............. . . . . . . . ... .
Yes
Appr Date
12
Permit can be issued without administrative_ approval . . . . . . . . ........... . . . .
Yes _
13
Can permit be approved before 15 day wait_
Yes
SFD 3/28/2019
_ _ _ _ _ _ _ _ _ _
14
Well located within area and.strata authorized by Injection Order # (put 10# igcomments)_(For.
NA.......
.
15
All wells _within 114. mile area. of review identified (For service well only)...... _ _ _ _
NA...
_
16
Pre -produced injector: duration of pre production less than 3 months (For service well only) ..
NA
17
18
Nonconven, gas conforms to AS31,05.030U.1.A),(j.2.A-D) _ _ _ _ _ _ _ _ _ _
Conductor string_ provided. ..........
.... . . . . . _ .
NA, .
NA_ _
_ .. .
_ _ _ _ _ CTD sidetrack belexistin
ow. g_produclion tubing from production liner
Engineering
19
Surface casing. protects all known USDWs _ _ _ _ _ _ ...
NA
_ _ _ CTD sidetrack be)ow.existing_production tubing from production liner
20
CMT vol adequate to circulate. on conductor & surf.csg _ . _ _ _ _ _ _ _ _ _ _
NA
. CTD sidetrack below existing_ production tubing from production liner
21
CMT vol adequate to tie-in long string to surf csg. . . . . . . . ......... . _ .
NA
_ _ _ _ CTD sidetrack below.existing.production tubing from production liner _
22
CMT, will coverall known. productive horizons . . . . . . ..... . . . . . . . .. ....
NA
_ _ _ _ CTD sidetrack, Autonomous Inflow Liner will be uncemented, entire lateral in the reservoir
23
Casing designs adequate for C,.T B & permafrost.... _ _ _ _ _ ... _ _ _ _ _
Yes
24
Adequate tankage or reserve pit .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
... _ _ CDR 2 will be on continuous operations.
25
If a, re -drill, has. a 10-403 for abandonment been approved _ _ . _ .... _ _ ....
NA_ _
_ Extending the lateralin the existing pool _ _ _
26
Adequate wellbore separation proposed. _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ ..... Meets all. BP wellbore separation criteria ...
27
If diverter required, does it meet regulations _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
NA_
_ _ _ _ _ CTD sidetrack
Appr Date
28
Drilling fluid program schematic & equip list adequate, . ... . .. . . . . . . . ........ .
Yes
...... _ .
MGR 4/11/2019
29
BOPEs, do they meet regulation . . . . ... . .. . . . . . . ... . . . ........ . .
Yes _
_ _ .... 5K BOPE tested to 3L500 psi _ _ _ ..............
30
BOPE press rating appropriate; test to (put prig in comments)_ _ _ _ _ _ _ _ ....
Yes
_ _ 5K BOPE tested to 3500 psi
31
Choke manifold complies w/API RP -53 (May 84) _ .. _ _ _ _ _ _ _ _ _ _ _ _
Yes
32
Work will occur without operation shutdown. _ _ _ _ _ _ _ _ _
Yes
33
Is presence. of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ....
Yes _
_ _ _ _ _ DS15. is considered an H2S_ pad._ BP standard monitoring in place............
34
Mechanical. condition of wells within AOR verified (For service well only.). _ . _ _ _
NA
_ _ _ . Development well _____
35
Permit can be issued w/o hydrogen sulfide measures .... _ _
No. _
_ .... _ DS 15 wells are H2S-bearing. H2S measures are required.
Geology
36
Data presented on potential overpressure zones _ _ _ _ _ ...
Yes ....
_ _ Expected reservoir pressure is 7,45 ppg EMW; will be drilled using.8:4 ppg mud &. coiled.tubing,
Appr Date
37
Seism ie analysis of shallow gas zones _ _ _ _ _ _ ______ _ _ _ _ _ _ _ _ _
NA_ _
_ _ _ Should higher pore.pressures be encountered, BP has. immediate access to nearby fluid.mixing facilities..
SFD 3/28/2019
38
Seabed condition survey.(if off -shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ....NA..
_ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ _ _ _ .. . .. ... . . . .... . . .....
39
Contactname/phone for weekly progress reports [exploratory only] ...... . . . . .... . .
NA_
Geologic
Engineering
Public
Commissioner:
Date:
Commissioner:
Date .
Commissioner Date