HomeMy WebLinkAbout219-049Suspended Well Inspection Review Report Reviewed By:
P.I. Suprv
Comm ________
JBR 09/09/2025
InspectNo:susSAM250730122604
Well Pressures (psi):
Date Inspected:7/30/2025
Inspector:Austin McLeod
If Verified, How?Other (specify in comments)
Suspension Date:9/13/2020
#319-422
Tubing:0
IA:200
OA:240
Operator:Hilcorp North Slope, LLC
Operator Rep:Andrew Ogg
Date AOGCC Notified:7/25/2025
Type of Inspection:Subsequent
Well Name:PRUDHOE BAY UNIT E-35C
Permit Number:2190490
Wellhead Condition
Good. All valves operable. SSV opened to get tubing pressure. Flow line removed. No issues.
Surrounding Surface Condition
Good/clean. Typical pad gravel.
Condition of Cellar
Small amount of clean water (been raining for a few days). No sheen.
Comments
Pad map used.
Supervisor Comments
Photos (8)
Suspension Approval:Sundry
Location Verified?
Offshore?
Fluid in Cellar?
Wellbore Diagram Avail?
Photos Taken?
VR Plug(s) Installed?
BPV Installed?
Tuesday, September 9, 2025
9
9
9 9
9
9
9
9
9
9
9
9
2025-0730_Suspend_PBU_E-35C_photos_am Page 1 of 4 Suspended Well Inspection – PBU E-35C (PTD 2190490) AOGCC Inspection susSAM250730122604 Photos by AOGCC Inspector A. McLeod 7/30/2025 Wellhouse Production Tree
2025-0730_Suspend_PBU_E-35C_photos_am Page 2 of 4 Surface Safety Valve Production Tree
2025-0730_Suspend_PBU_E-35C_photos_am Page 3 of 4 Tubing Pressure Valve IA Pressure Valve
2025-0730_Suspend_PBU_E-35C_photos_am
Page 4 of 4
OA Pressure Valve
Well Cellar
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-35C
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
219-049
50-029-22557-04-00
8742
Conductor
Surface
Intermediate
Production
Liner
8703
80
3593
8518
8507
20"
10-3/4"
7-5/8"
8493
35 - 115
34 - 3627
33 - 8551
35 - 115
34 - 3622
33 - 8531
None
470
1730
4790
8507, 8535
1490
4560
6890
None
4-1/2" 12.6# L-80 31 - 8551
None
Structural
No Packer
None
None
Torin Roschinger
Operations Manager
Andy Ogg
andrew.ogg@hilcorp.com
907.659.5102
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028304
31 - 8531
N/A
N/A
100
200
30
0
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 7:53 am, Aug 13, 2025
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2025.08.13 05:45:17 -
08'00'
Torin Roschinger
(4662)
RBDMS JSB 081825
DSR-9/11/25JJL 9/5/25
ACTIVITY DATE SUMMARY
7/30/2025
T/I/O = 0/200/240. Temp = SI. AOGCC SU well Inspection Witnessed by Austin
McLeod. Pictures taken.
SV = C, WV = LOTO, SSV = C. MV = O. IA, OA = OTG. 09:30
Daily Report of Well Operations
PBU E-35C
E-35C
5
5
5
5
5
RBDMS HEW 9/22/2021
MGR11OCT2021 SFD 9/28/2021DSR-9/20/21
N
.Suspended Well Inspection Review Report
`
|nspectNo: susLOL218906140326
Date Inspected: 9/6/2031
Inspector: Lou Laubenstein Type of Inspection
VVeAName:
PRUDHOEBAY UNIT E'35[ '
Permit Number:
2190490 '
Suspension Approval:
Sundry ' # 319'422 '
Suspension Date:
9/13/3020
Location Verified?
`
)fVerified, How?
other (specify incomments)
Offshore?
11
Initial
Date AOGC[Notified: 8/27/2021 '
Operator: Hi|corp North Slope, LL[
Operator Rep: Andy Ogg
Wellbore Diagram Avail?
Photos Taken?
VVeU Pressures (psi): 30 ' Fluid inCellar? �]
|A� 100 ' 8PV Installed 7 []
OA0' VR P|og(s) Installed? []
Wellhead Condition
Wellhead was clean and in good condition, no leaks or visable issues could be seen. Temparary scaffold was erected around ,
the Wellhead.
Condition ofCellar
Cellar appeared tobefrea|and clear ofany debris o/contamination.
Surrounding SurfaceCondidon
A WellhOUse is on this well and the area inside and outside where clean and in order. /
`
Commen1s
Location verified onPad plot map and meUhousesignage '
SupervisorComments
/,
Photos(3)
14iJtL'\
TuesdaKSeptembe/14,2U21
N
41
r
IL
U C C-M)�
Ln (0 s,r,
LL
O
W 'r
J u U
ad
c N
.O J p
C:
/•� 0
<
W/��
C
rA----
C>U �O o
U) N o
U) Q � ,...s:.--.;�.��nar�re.w.sTs+�.rtw�=�,�a�*se�-.www•
3 0 C (oc� to
cn < 0) ffiA. � a
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22557-04-00Well Name/No. PRUDHOE BAY UNIT E-35CCompletion StatusSUSPCompletion DatePermit to Drill2190490OperatorHilcorp North Slope, LLCMD8742TVD8703Current StatusSUSP10/15/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/RES/ROPNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC5/21/20198551 8742 Electronic Data Set, Filename: E-35C_LWD_FINAL_FIELD_COMPOSITE_12MAY2019_BHI_CTK.las30811EDDigital DataC5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_MD_FINAL_FIELD_BHI_CTK.cgm30811EDDigital DataC5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_TVDSS_FINAL_FIELD_BHI_CTK.cgm30811EDDigital DataC5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_MD_FINAL_FIELD_BHI_CTK.pdf30811EDDigital DataC5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_TVDSS_FINAL_FIELD_BHI_CTK.pdf30811EDDigital DataC5/21/2019 Electronic File: E-35C Final Field Surveys.csv30811EDDigital DataC5/21/2019 Electronic File: E-35C Final Field Surveys.xlsx30811EDDigital DataC5/21/2019 Electronic File: E-35C Final Survey.txt30811EDDigital DataC5/21/2019 Electronic File: E-35C Final Surveys.pdf30811EDDigital DataC5/21/2019 Electronic File: E-35C_25_tapescan_BHI_CTK.txt30811EDDigital DataC5/21/2019 Electronic File: E-35C_5_tapescan_BHI_CTK.txt30811EDDigital DataC5/21/2019 Electronic File: E-35C_output.tap30811EDDigital DataThursday, October 15, 2020AOGCCPage 1 of 3E-,35C_LWD_FINAL_FIELD_COMPOSITE_12MAY2__019_BHI_CTK.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22557-04-00Well Name/No. PRUDHOE BAY UNIT E-35CCompletion StatusSUSPCompletion DatePermit to Drill2190490OperatorHilcorp North Slope, LLCMD8742TVD8703Current StatusSUSP10/15/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:Release Date:4/10/2019C5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_MD_FINAL_FIELD_BHI_CTK.tif30811EDDigital DataC5/21/2019 Electronic File: E-35C_GR_Res_12MAY2019_TVDSS_FINAL_FIELD_BHI_CTK.tif30811EDDigital DataC0 0 2190490 PRUDHOE BAY UNIT E-35C LOG HEADERS30811LogLog Header ScansThursday, October 15, 2020AOGCCPage 2 of 3
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22557-04-00Well Name/No. PRUDHOE BAY UNIT E-35CCompletion StatusSUSPCompletion DatePermit to Drill2190490OperatorHilcorp North Slope, LLCMD8742TVD8703Current StatusSUSP10/15/2020UICNoCompliance Reviewed By:Date:Thursday, October 15, 2020AOGCCPage 3 of 310/15/2020M. Guhl
1a. Well Status:
GINJ
Oil 1b. Well Class:
5 Exploratory
Service
Hilcorp North Slope, LLC
14. Permit to Drill Number/Sundry
219-049
5/9/2019
10/5/2019
GL PRUDHOE BAY, PRUDHOE OIL
4a.
Surface:
Top of Productive Interval:
Total Depth:
1187' FNL, 501' FEL, Sec. 06, T11N, R14E, UM
1368'FNL, 752' FEL, Sec. 06, T11N, R14E, UM
Surface: x- y- Zone -664470 5975877 ASP4
11.
Gas SPLUG Abandoned
20AAC 25.105
Suspended
20AAC 25.110
5
WINJ WAG WDSPL No. of Completions:
9/13/20
15.
50-029-22557-04-00
16.
PBU E-35C
Well Name and Number:
8742' / 8703'
30.50
17.
TPI:y- Zone -x-
Total Depth: x-y-Zone -664224 ASP45975691
8742' / 8703'
None
DNR Approval Number:19.
89-111
5. Directional or Inclination Survey:
Yes No
Submit electronic and printed information per 20 AAC 25.050 (ft MSL)
20.Thickness of Permafrost MD/TVD:
CASING WT. PER
FT.GRADE SETTING DEPTH MD
TOP BOTTOM
HOLE SIZE CEMENTING RECORD AMOUNT
PULLED
Location of Well (Governmental Section):
Field/Pool(s):
Date Comp., Susp., or Aband.:6.
Total Depth (MD/TVD):
CASING, LINER AND CEMENTING RECORD
TOP BOTTOM
22.
SETTING DEPTH TVD
7-5/8"
91.5#
45.5#
29.7#
NT-80
L-80
35'
33'8551'
35'
33'8531' 9-7/8"
260 sx Arctic Set (approx.)
485 sx Class 'G'
25.
GRADE PACKER SET (MD/TVD)
26.
4-1/2" 12.6# L-80 8551'
DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED
PRODUCTION TEST27.
Date First Production:
Date of Test:
Flow Tubing
Press
Oil-Bbl:
Oil-Bbl:
Gas-MCF:Water-Bbl:
Oil Gravity - API (corr):
Method of Operation (Flowing, gas lift, etc.):
Gas-Oil Ratio:Choke Size:
Water-Bbl:
Open to production or injection?Yes No 524.
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
H-40 115'30"20"
10-3/4"35 3627 13-1/2"1175 sx CS III, 375 sx Class 'G'35 3622
None
Gas-MCF:
Production for
Test Period
Calculated
24 Hour Rate
Hours Tested:
Casing Press:
115'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
TUBING RECORD
DEPTH SET (MD)
Yes No 5Was hydraulic fracturing used during completion?
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
ADL 028304
319-422
Other
12. SSSV Depth (MD/TVD):
Ref Elevations
BF 31.51
(attached)5
KB
Form 10-407 Revised 3/2020
Sr Pet Eng Sr Pet Geo Sr Res Eng
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Development
Stratigraphic Test
2.Operator Name:
3.Address:
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
7. Date Spudded:
8. Date TD Reached:
9.
10. Plug Back Depth(MD/TVD):
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
65.29
Water Depth, if Offshore:13.
N/A
0
API Number:
Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
23.
18.Property Designation:
21.Re-drill/Lateral Top Window
MD/TVD:
8551' / 8531'
1900' (approx)
Submit within 30 days of Completion, Suspension, or Abandonment
GR, ROP, RES
By Samantha Carlisle at 7:42 pm, Sep 28, 2020
Suspended Date
9/13/2020
MDG
RBDMS 10/13/2020 MDG
GDSR-10/14/2020MGR15OCT2020SFD 10/13/2020
If yes, list intervals and formations tested, briefly summarizing test results. Attach
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Permafrost - Base
Formation at total depth:
Contact Name:Noel Nocas
Contact Email: noel.nocas@hilcorp.com
Authorized Name:
Authorized Title:Operations Manager
Authorized Signature with Date:Contact Phone:(907)564-5278
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Kingak
28.CORE DATA
Conventional Core(s) Yes No 5 Sidewall Cores Yes No 5
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
Well Tested? Yes
8742'8703'
Top of Productive Interval
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered):
NAME MD TVD
Permafrost - Top No 5
31. Directional Surveys, Wellwork Daily Report Summary, Wellbore Schematic DiagramList of Attachments:
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
N/A N/A
Bo York
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2020.09.28 16:56:22 -08'00'
Bo York
ACTIVITY DATE SUMMARY
9/4/2019 Injectivity test Job cancelled No scaffold around well
9/6/2019
T/I/O=300/90/0 Temp= S/I (LRS Unit 76-Injectivity Test) Pumped 47 bbls crude down
TBG at approx 3.5 BPM. reduced rate due to TBG pressure. Continued to reduce
rate until TBG locked up at 65.6 bbls. Shut down and montiored pressure for 10
minutes. Pumped an additional .5 bbls until TBG locked up. (See log for details)
Bleed back 4 bbls crude Valve positions=SV,SSV,WV closed MV open CV's OTG
FWHP=480/142/0
9/2/2020
...Well shut in on arrival... (HES Eline - Set CIBP, Dump Bail Cement)
DRIFT TO 8,551' ELM WITH 3.66" JUNK BASKET.
SET 4-1/2" APLHA BIG BOY CIBP AT 8,535' ELM. (aogcc witnessed setting a
tagging cibp - Adam Earl)
...Job continued on 03-Sep-20 wsr...
9/3/2020
...Continued from 02-Sep-20... (HES Eline - Dump Bail Cement)
DUMP 28' OF 17PPG CEMENT ON TOP OF CIBP AT 8,535'. CEMENT PLUG
FROM 8,535' - 8,507'. (wait on cement 48hrs before testing)
***Job Complete, Well shut in on departure.***
9/9/2020
T/I/O = 850/80/0. Temp = SI. TBG FL (Pre MIT). No AL or flowline. TBG FL @
surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:50
9/13/2020
T/I/O = 850/100/Vac. Temp = SI. MIT x TBG Passed to 2203 psi (AOGCC
witnessed by Guy Cook). Max applied pressure = 2300 psi. Test pressure = 2200
psi. TBG FL @ surface. No flowline. Temp scaffolding installed in wellhouse. Used
.8 bbls of DSL to pressure the IA up to 2300 psi. The IA lost 76 psi in 15 minutes and
21 psi in the second 15 minutes for a total loss of 97 psi. Bled the TP (.9 bbls).
FWPs = 30/100/Vac.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:10
Daily Report of Well Operations
PBU E-35C
suspended
Final Survey Report
14 May, 2019
Design: E-35C
North America - ALASKA - BP
PBU
E
E-35
E-35C
500292255704
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
Map System:
Geo Datum:
Project
Map Zone:
System Datum:Alaska NAD27 State Plane Zones
NAD27 * OGP-Usa AK [4267*15864]
PBU, PBU, PRUDHOE
NAD27 * OGP-Usa AK / Alaska zone 4 [26734*15864]
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site Position:
From:
Site
Latitude:
Longitude:
Position Uncertainty:
Northing:
Easting:
Grid Convergence:
E, TR-11-14
usft
Map usft
usft
°1.24Slot Radius:in0.000
5,973,160.880
662,538.970
0.00
70° 19' 59.134 N
148° 40' 53.054 W
Well
Well Position
Longitude:
Latitude:
Easting:
Northing:
usft
+E/-W
+N/-S
Position Uncertainty
usft
usft
usftGround Level:
E-35, E-35
usft
usft
0.00
0.00
5,975,877.210
664,470.460
29.51Wellhead Elevation:31.51 usft0.00
70° 20' 25.430 N
148° 39' 54.924 W
Wellbore
Declination
(°)
Field Strength
(nT)
Sample Date Dip Angle
(°)
E-35C
Model NameMagnetics
BGGM2018 5/1/2019 16.90 80.95 57,430
Phase:Version:
Audit Notes:
Design E-35C
1.0 ACTUAL
Vertical Section:Depth From (TVD)
(usft)
+N/-S
(usft)
Direction
(°)
+E/-W
(usft)
Tie On Depth:8,531.22
234.090.000.0033.78
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 2
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
From
(usft)
Survey Program
DescriptionTool NameSurvey (Wellbore)
To
(usft)
Date 5/14/2019
MWD MWD - Standard302.15 8,531.22 E-35PB1 Survey 1 MWD-Standard (E-35P
MWD MWD - Standard8,551.00 8,742.00 Survey #1 (E-35C)
MD
(usft)
Inc
(°)
Azi
(°)
N/S
(usft)
E/W
(usft)
Northing
(usft)
TVDSS
(usft)
Easting
(usft)
Survey
TVD
(usft)
DLeg
(°/100usft)
V. Sec
(usft)
33.78 0.00 0.00 33.78 -31.51 0.00 0.00 5,975,877.210 664,470.460 0.00 0.00
302.15 0.20 57.90 302.15 236.86 0.25 0.40 5,975,877.467 664,470.851 0.07 -0.47
391.00 0.40 264.60 391.00 325.71 0.30 0.22 5,975,877.517 664,470.673 0.66 -0.35
480.10 1.10 267.30 480.09 414.80 0.23 -0.94 5,975,877.422 664,469.511 0.79 0.63
571.59 2.20 245.00 571.54 506.25 -0.55 -3.41 5,975,876.584 664,467.060 1.37 3.09
660.65 3.20 251.40 660.50 595.21 -2.07 -7.32 5,975,874.984 664,463.189 1.17 7.14
751.29 3.40 251.90 750.99 685.70 -3.71 -12.27 5,975,873.234 664,458.274 0.22 12.11
841.55 4.40 247.70 841.04 775.75 -5.85 -18.02 5,975,870.963 664,452.575 1.15 18.03
932.29 7.40 244.60 931.29 866.00 -9.68 -26.52 5,975,866.949 664,444.161 3.32 27.16
1,023.32 7.60 255.10 1,021.55 956.26 -13.74 -37.63 5,975,862.644 664,433.140 1.52 38.54
1,114.69 7.10 249.00 1,112.17 1,046.88 -17.32 -48.74 5,975,858.825 664,422.111 1.01 49.64
1,211.07 6.90 247.40 1,207.83 1,142.54 -21.68 -59.65 5,975,854.227 664,411.305 0.29 61.03
1,303.21 6.00 244.20 1,299.38 1,234.09 -25.90 -69.09 5,975,849.798 664,401.955 1.05 71.16
1,398.25 4.80 232.00 1,394.00 1,328.71 -30.51 -76.70 5,975,845.023 664,394.452 1.74 80.02
1,490.25 3.60 222.60 1,485.76 1,420.47 -35.01 -81.69 5,975,840.419 664,389.564 1.50 86.70
1,585.85 2.60 224.40 1,581.22 1,515.93 -38.77 -85.24 5,975,836.583 664,386.099 1.05 91.78
1,680.02 2.30 214.30 1,675.30 1,610.01 -41.86 -87.80 5,975,833.441 664,383.608 0.56 95.66
1,776.60 1.60 209.60 1,771.82 1,706.53 -44.63 -89.56 5,975,830.630 664,381.911 0.74 98.71
1,870.44 1.80 202.80 1,865.62 1,800.33 -47.13 -90.77 5,975,828.106 664,380.748 0.30 101.16
1,965.06 1.00 203.20 1,960.21 1,894.92 -49.26 -91.67 5,975,825.958 664,379.894 0.85 103.14
2,060.34 1.30 290.10 2,055.48 1,990.19 -49.65 -93.02 5,975,825.536 664,378.560 1.68 104.46
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 3
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
MD
(usft)
Inc
(°)
Azi
(°)
N/S
(usft)
E/W
(usft)
Northing
(usft)
TVDSS
(usft)
Easting
(usft)
Survey
TVD
(usft)
DLeg
(°/100usft)
V. Sec
(usft)
2,156.77 2.50 297.10 2,151.86 2,086.57 -48.31 -95.92 5,975,826.806 664,375.632 1.27 106.03
2,251.53 1.10 298.80 2,246.57 2,181.28 -46.94 -98.55 5,975,828.128 664,372.966 1.48 107.35
2,346.33 0.60 289.30 2,341.36 2,276.07 -46.33 -99.82 5,975,828.702 664,371.687 0.55 108.02
2,441.89 0.60 272.90 2,436.91 2,371.62 -46.14 -100.79 5,975,828.871 664,370.711 0.18 108.70
2,537.16 0.60 287.60 2,532.18 2,466.89 -45.97 -101.77 5,975,829.026 664,369.734 0.16 109.39
2,632.91 0.70 280.50 2,627.92 2,562.63 -45.71 -102.82 5,975,829.261 664,368.676 0.13 110.09
2,727.33 0.70 281.40 2,722.33 2,657.04 -45.49 -103.95 5,975,829.455 664,367.539 0.01 110.88
2,823.16 0.60 264.70 2,818.16 2,752.87 -45.42 -105.02 5,975,829.501 664,366.464 0.22 111.70
2,917.52 0.90 263.00 2,912.51 2,847.22 -45.56 -106.25 5,975,829.338 664,365.240 0.32 112.78
3,013.17 0.80 262.40 3,008.15 2,942.86 -45.74 -107.66 5,975,829.128 664,363.837 0.10 114.02
3,106.91 0.60 256.80 3,101.88 3,036.59 -45.93 -108.79 5,975,828.904 664,362.715 0.23 115.05
3,202.85 0.40 241.80 3,197.82 3,132.53 -46.21 -109.57 5,975,828.614 664,361.937 0.25 115.85
3,295.82 0.40 235.50 3,290.78 3,225.49 -46.54 -110.12 5,975,828.265 664,361.391 0.05 116.49
3,391.36 0.50 260.50 3,386.32 3,321.03 -46.80 -110.81 5,975,827.992 664,360.711 0.23 117.20
3,485.96 0.70 249.20 3,480.92 3,415.63 -47.07 -111.76 5,975,827.698 664,359.770 0.24 118.13
3,557.08 0.40 235.90 3,552.03 3,486.74 -47.37 -112.37 5,975,827.391 664,359.165 0.46 118.80
3,677.00 0.40 261.60 3,671.95 3,606.66 -47.66 -113.13 5,975,827.079 664,358.411 0.15 119.59
3,772.65 0.30 241.90 3,767.60 3,702.31 -47.83 -113.68 5,975,826.900 664,357.864 0.16 120.13
3,867.10 0.40 239.60 3,862.05 3,796.76 -48.11 -114.18 5,975,826.606 664,357.368 0.11 120.70
3,962.61 0.20 228.60 3,957.56 3,892.27 -48.39 -114.60 5,975,826.318 664,356.961 0.22 121.20
4,054.62 0.20 233.40 4,049.56 3,984.27 -48.60 -114.85 5,975,826.111 664,356.717 0.02 121.52
4,148.41 0.10 220.60 4,143.35 4,078.06 -48.75 -115.03 5,975,825.947 664,356.535 0.11 121.76
4,242.95 0.30 247.60 4,237.89 4,172.60 -48.91 -115.31 5,975,825.784 664,356.256 0.23 122.09
4,337.27 0.30 240.80 4,332.21 4,266.92 -49.13 -115.76 5,975,825.560 664,355.817 0.04 122.57
4,434.19 0.20 247.50 4,429.13 4,363.84 -49.31 -116.13 5,975,825.363 664,355.444 0.11 122.99
4,528.18 0.30 230.10 4,523.12 4,457.83 -49.54 -116.47 5,975,825.135 664,355.108 0.13 123.39
4,620.12 0.30 232.90 4,615.06 4,549.77 -49.84 -116.85 5,975,824.827 664,354.739 0.02 123.87
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 4
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
MD
(usft)
Inc
(°)
Azi
(°)
N/S
(usft)
E/W
(usft)
Northing
(usft)
TVDSS
(usft)
Easting
(usft)
Survey
TVD
(usft)
DLeg
(°/100usft)
V. Sec
(usft)
4,716.97 0.30 235.50 4,711.91 4,646.62 -50.13 -117.26 5,975,824.522 664,354.334 0.01 124.38
4,812.12 0.30 231.80 4,807.06 4,741.77 -50.43 -117.66 5,975,824.218 664,353.940 0.02 124.88
4,906.41 0.30 241.00 4,901.35 4,836.06 -50.70 -118.07 5,975,823.937 664,353.536 0.05 125.37
4,997.33 0.30 241.80 4,992.26 4,926.97 -50.93 -118.49 5,975,823.700 664,353.123 0.00 125.84
5,096.86 0.40 251.20 5,091.79 5,026.50 -51.16 -119.05 5,975,823.452 664,352.570 0.12 126.43
5,192.55 0.40 252.40 5,187.48 5,122.19 -51.37 -119.68 5,975,823.230 664,351.940 0.01 127.07
5,288.26 0.40 247.50 5,283.19 5,217.90 -51.60 -120.31 5,975,822.987 664,351.318 0.04 127.71
5,383.32 0.30 260.50 5,378.25 5,312.96 -51.77 -120.86 5,975,822.807 664,350.770 0.13 128.26
5,477.40 0.30 243.80 5,472.32 5,407.03 -51.92 -121.33 5,975,822.648 664,350.309 0.09 128.72
5,570.53 0.20 221.50 5,565.45 5,500.16 -52.15 -121.65 5,975,822.411 664,349.988 0.15 129.12
5,667.99 0.30 256.30 5,662.91 5,597.62 -52.33 -122.01 5,975,822.216 664,349.632 0.18 129.52
5,764.60 0.20 265.80 5,759.52 5,694.23 -52.41 -122.43 5,975,822.134 664,349.220 0.11 129.90
5,856.20 0.30 290.40 5,851.12 5,785.83 -52.33 -122.81 5,975,822.198 664,348.834 0.16 130.17
5,952.64 0.40 269.40 5,947.56 5,882.27 -52.25 -123.39 5,975,822.270 664,348.259 0.17 130.58
6,047.81 0.40 276.30 6,042.73 5,977.44 -52.22 -124.05 5,975,822.288 664,347.596 0.05 131.10
6,141.73 0.40 284.90 6,136.64 6,071.35 -52.10 -124.69 5,975,822.394 664,346.951 0.06 131.55
6,234.19 0.40 282.30 6,229.10 6,163.81 -51.95 -125.32 5,975,822.532 664,346.321 0.02 131.97
6,330.41 0.40 261.20 6,325.32 6,260.03 -51.92 -125.98 5,975,822.538 664,345.660 0.15 132.49
6,425.90 0.50 243.60 6,420.81 6,355.52 -52.16 -126.68 5,975,822.286 664,344.963 0.18 133.20
6,519.77 0.40 244.30 6,514.67 6,449.38 -52.49 -127.34 5,975,821.948 664,344.308 0.11 133.93
6,615.25 0.40 240.10 6,610.15 6,544.86 -52.80 -127.93 5,975,821.624 664,343.726 0.03 134.58
6,710.23 0.40 235.70 6,705.13 6,639.84 -53.15 -128.49 5,975,821.260 664,343.173 0.03 135.25
6,806.26 0.40 247.30 6,801.16 6,735.87 -53.47 -129.08 5,975,820.929 664,342.594 0.08 135.91
6,902.39 0.40 255.40 6,897.28 6,831.99 -53.68 -129.71 5,975,820.701 664,341.964 0.06 136.55
6,993.21 0.40 263.50 6,988.10 6,922.81 -53.80 -130.34 5,975,820.571 664,341.345 0.06 137.12
7,089.21 0.40 270.00 7,084.10 7,018.81 -53.83 -131.00 5,975,820.519 664,340.678 0.05 137.68
7,185.21 0.40 269.60 7,180.10 7,114.81 -53.84 -131.67 5,975,820.502 664,340.008 0.00 138.23
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 5
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
MD
(usft)
Inc
(°)
Azi
(°)
N/S
(usft)
E/W
(usft)
Northing
(usft)
TVDSS
(usft)
Easting
(usft)
Survey
TVD
(usft)
DLeg
(°/100usft)
V. Sec
(usft)
7,281.37 0.40 264.50 7,276.26 7,210.97 -53.87 -132.34 5,975,820.453 664,339.339 0.04 138.79
7,372.37 0.50 261.00 7,367.25 7,301.96 -53.96 -133.05 5,975,820.345 664,338.633 0.11 139.42
7,469.53 0.50 256.30 7,464.41 7,399.12 -54.13 -133.88 5,975,820.160 664,337.807 0.04 140.19
7,562.76 0.50 252.80 7,557.64 7,492.35 -54.35 -134.67 5,975,819.926 664,337.028 0.03 140.95
7,661.96 0.60 246.40 7,656.83 7,591.54 -54.68 -135.56 5,975,819.571 664,336.146 0.12 141.87
7,757.89 0.60 247.80 7,752.76 7,687.47 -55.07 -136.48 5,975,819.159 664,335.230 0.02 142.85
7,852.03 0.70 240.30 7,846.89 7,781.60 -55.54 -137.44 5,975,818.667 664,334.284 0.14 143.90
7,946.19 0.70 246.40 7,941.04 7,875.75 -56.06 -138.46 5,975,818.130 664,333.269 0.08 145.03
8,042.25 0.50 250.30 8,037.10 7,971.81 -56.44 -139.40 5,975,817.733 664,332.346 0.21 146.01
8,136.20 0.40 249.10 8,131.04 8,065.75 -56.69 -140.09 5,975,817.463 664,331.659 0.11 146.72
8,245.16 2.30 221.10 8,239.97 8,174.68 -58.48 -141.88 5,975,815.641 664,329.906 1.80 149.21
8,280.23 5.10 220.80 8,274.96 8,209.67 -60.19 -143.36 5,975,813.898 664,328.462 7.98 151.42
8,318.09 7.90 224.60 8,312.58 8,247.29 -63.31 -146.29 5,975,810.708 664,325.605 7.48 155.62
8,349.18 10.20 228.30 8,343.28 8,277.99 -66.67 -149.85 5,975,807.278 664,322.124 7.63 160.47
8,381.46 12.90 226.00 8,374.90 8,309.61 -71.07 -154.57 5,975,802.771 664,317.495 8.48 166.88
8,412.87 16.20 228.50 8,405.30 8,340.01 -76.41 -160.38 5,975,797.304 664,311.808 10.69 174.71
8,436.79 19.10 226.40 8,428.09 8,362.80 -81.32 -165.71 5,975,792.278 664,306.583 12.41 181.92
8,468.96 22.70 227.10 8,458.14 8,392.85 -89.18 -174.07 5,975,784.239 664,298.397 11.22 193.30
8,500.57 26.90 227.70 8,486.83 8,421.54 -98.15 -183.83 5,975,775.060 664,288.835 13.31 206.46
8,531.22 29.20 228.20 8,513.88 8,448.59 -107.80 -194.54 5,975,765.177 664,278.347 7.54 220.79
Tie in point
8,551.00 30.74 228.07 8,531.01 8,465.72 -114.39 -201.90 5,975,758.423 664,271.136 7.79 230.62
KOP - Top of Whipstockk
8,572.15 28.06 225.46 8,549.44 8,484.15 -121.50 -209.46 5,975,751.157 664,263.725 14.04 240.91
Interpolated Azimuth
8,600.23 24.85 221.76 8,574.57 8,509.28 -130.53 -218.10 5,975,741.933 664,255.287 12.85 253.21
Interpolated Azimuth
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 6
Project:
Company:Local Co-ordinate Reference:
TVD Reference:
Site:
North America - ALASKA - BP
PBU
E
BP
Final Survey Report
Well:
Wellbore:
E-35
E-35C Survey Calculation Method:Minimum Curvature
KB @ 65.29usft (E-35)
Design:E-35C Database:EDM R5K - Alaska PROD - ANCP1
MD Reference:KB @ 65.29usft (E-35)
North Reference:
Well E-35
True
D E F I N I T I V E
MD
(usft)
Inc
(°)
Azi
(°)
N/S
(usft)
E/W
(usft)
Northing
(usft)
TVDSS
(usft)
Easting
(usft)
Survey
TVD
(usft)
DLeg
(°/100usft)
V. Sec
(usft)
8,630.00 23.98 217.54 8,601.68 8,536.39 -140.00 -225.96 5,975,732.300 664,247.644 6.55 265.12
Interpolated Azimuth
8,660.16 25.40 212.96 8,629.09 8,563.80 -150.29 -233.21 5,975,721.856 664,240.617 7.90 277.03
Interpolated Azimuth
8,690.08 25.75 208.12 8,656.08 8,590.79 -161.40 -239.77 5,975,710.598 664,234.308 7.08 288.86
First Clean Survey
8,742.00 25.75 208.12 8,702.84 8,637.55 -181.30 -250.40 5,975,690.477 664,224.116 0.00 309.14
Projection to TD
5/14/2019 1:44:31PM COMPASS 5000.1 Build 81D Page 7
MEMORANDUM
TO: Jim Regg
P.I. Supervisor �� V
FROM: Guy Cook
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, September 16, 2020
SUBJECT: Mechanical Integrity Tests
Hilcorp North Slope, LLC
E -35C
PRUDHOE BAY UNIT E -35C
Sre: Inspector
Reviewed By:!�?n �
P.L Supry
Comm
Well Name PRUDHOE BAY UNIT E -35C API Well Number 50-029-22557-04-00 Inspector Name: Guy Cook
Permit Number: 219-049-0 Inspection Date: 9/13/2020
Insp Num: mitGDC200913144434
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well E -35C Type Inj N 'TVD8668
Tubing 853
2300
2224 - I 2203 -
-
PTD 2190490 Type TCSt SPT 2200
I
BBL Pumped_ 0.8 BBL Returned: 0.9
-
IA 100
OA 0
113
0
114 114
0 0
Interval) OTHER PIF P
_ _
Notes: MIT -T to 2200 psi for suspension post cement. Sundry 319-422. Testing completed with a triplex pump, bleed trailer and calibrated gauges.
Wednesday, September 16, 2020 Page I of I
THE STATE
oil �kiq
AD S" bylc#4040"'A
GOVERNOR MIKE DUNLEAVY
Aras Worthington
Interventions and Integrity Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU E -35C
Permit to Drill Number: 219-049
Sundry Number: 319-422
Dear Mr. Worthington:
Alaska Gil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
i
essie L. Chmielowski
Commissioner
DATED this I q day of September, 2019.
-3B®MS Y/t-/SEP 19 2019
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS'
APPLICATION FOR SUNDRY APPROVAL,,
20 AAC 25.280
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑
Suspend Q - Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development p
5. Permit to Drill Number: 219-049
3. Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stratigraphic El Service El6.
API Number: 50-029-22557-04 00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No 13
PBU E -35C
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028304
PRUDHOE BAY, PRUDHOE OIL
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(ft):
Effective Depth MD:
Effective Depth TVD:
MPSP (psi):
Plugs (MD):
Junk (MD):
8742
8703
8742
8703
None
None
Casing
Length
Size MD TVD
Burst
Collapse
Structural
Conductor
80
20" 35-115 35-115
1490
470
Surface
3592
10-3/4" 35-3627 35-3622
4560
1730
Intermediate
8518
7-5/8" 33-8551 33-8531
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
8551 -8742
8531 - 8703
4-1/2" 12.6#
L-80
31 -8551
Packers and SSSV Type: No Packer
Packers and SSSV MD (ft) and TVD (ft): No Packer
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary O Wellbore Schematic p
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑
14. Estimated Date for Commencing Operations: October 1, 2019
15. Well Status after proposed work:
Oil ❑ WINJ ❑ WDSPL ❑ Suspended Q
16. Verbal Approval: Date:
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Worthington, Aras J
be deviated from without prior written approval.
Contact Email: Aras.WorthingtontcDbp.com
Authorized Name: Worthington, Aras J Contact Phone: +1 907 564 4102
Authorized Title: Interventions & Integrity Enginee
Authorized Signature:/ Date: -1116'1,1P � !�
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
31q-yZ2
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test �* Location Clearance F]Other:
/`%- %- TC.
o —� `-'�� s
Post Initial Injection MIT Req'd? Yes ❑ No ❑
�BpMS SEP 19 2019
Spacing Exception Required? Yes 11 No ❑ Subsequent Form Required: 10 —,464
j 1 r APPROVED BYTHE
Approved by: lt7 {/� COMMISSIONER COMMISSION Date:
�--
� �" Dis
ORIGINAL ow%tt"
%rR i� Submit Form and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachment in Duplicate
bp
E-35 Suspend
Intervention Engineer
Aras Worthington (907) 564-4102
Production Engineer
Joleen Oshiro (907) 564-4606
Expected Start Date:
October 1, 2019
History
E -35C was an under the HOT play for coiled tubing drilling. The plan was kick-off in the Kingak
and drill the Ivishak target. While drilling through the shale, it was problematic keeping the system
clean due to shale instability. The decision was made to discontinue drilling through the Kingak.
Currently, the well is loaded with crude oil and 10.5# mud with polymer and black products. On
9/6/2019 an injectivity test was attempted down the tubing in an effort to pursue a fullbore cement
plug but there was no injectivity and the tubing locked up @ -3500 psi due to shale collapse. The
proposal is to suspend the well so that a potential Rotary Rig Sidetrack can be pursued in the
future.
Objective
Place an abandonment cement plug in the well above the existing openhole to fully secure
the well. Due to the Kingak shale collapse it is not desireable to try and re-enter/re-open the
"openhole" which has collapsed and has no injectivity.
Procedural steps
Coiled Tubing
1. RIH with a nozzle to 8551' MD (whipstock depth)
2. Lay in 10 bbls of 15.8 ppg Class G cement from 8500' MD to 7800' MD.
3. Freeze Protect upper 2500' of the well.
4. RDMO
Slickline
1. Tag TOC.
Fullbore ' I A'- �c./r-
1. WOC one week. MITT to 2500 psi. 'IO G.CC. `�o Oji 9�^� �`�'-"
WELLHEAD =
5M FMC
ACTUATOR =
DEV
KB. ELEV =
65.29'
BF. ELEV =
31.51'
KOP=
8349'
OPS SHUTDOWN I E-35 Current Status"° �""g`•"'""E""`�
]IT■ ■ r� 2205' 4-112' HES HXO SSSV NP, D = 3.813'
Max Angle = 20- C.ONDUCfOR,
Dat1m MD = u — 91.5#, H-40,
Dawn TVD = 8800' SS D = 19.124'
10-3/4" CSG, 45.5#, NT -80 BTC, ID
Minimum D = 3.80' 8551'
3627'
j 4-12' RKR MONOBORE WHPSTOCK w/RA $551'
[TAGS (0227119)
—75/8` CSG, 29.7#, L-80 NSCC, D = 6 87—� •-$551_' --
F4-12" THG, 12.6#, L -BO NSCC, — —8551'
.0152 bpf, D - 3 958` - - ._-. -- _----- ---
PERFORATION SMINIARY
REF LOG
ON
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
SQE SPF I INTERVAL I Opn/ SHOT I SQ
85.51 -R742 I I r*4
Cc'iR94 �85T.I�:;T:�9
ST
ND
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
4048
0
MER
DMY
BK
0
08/25!17
2
6731
6726
0
MER
DW
BK
0
08/25/17
1
8126
8120
0
MER
DW
BK
0
08/25/17
4 -1/2 -OPEN HOLE!---{ 8742'
—7200 1—j TOC (0127/19)
DATE REV BY COMMENTS
DATE REV BY COMMENTS
06/11/95 N28E ORIGINAL COMPLETION
--�--�
07/05/01 NORDIC 1 CTD SIDETRACK (E -35A)
12/07/10 NORDIC 1 CTD SIDETRACK (E -35B)
05113/19 N-CDR2 CTD OPS SHUTDOWN (E -35C)
05!15!19 ZB/JMD EDrrS TO OPS SHUTDOWN
0523119 ZB/JND FINAL ODE APPROVAL
MLLOUT WINDOW (E -35C) 8551' - 8561'
PRUDHOE BAY UNIT
WEi_L E 35C
PERMIT No: 219-049
API No: 50-029-22557-04
SEC 6, T11 N, RUE, 1187' FNL & 501' FEL
BP Exploration (Alaska)
f
WELLHEAD=
5MFMC
ACTUATOR =
91.5#, 1+40,
�U=19
KB. ELEV =
65.29',
BF. ELEV =
31.51',
KOP=
8349''
OPS SHUTD E-35 Proposed Suspend
2205'
Max Angle = _° @ _
20' COPDIJ 0R --�I
Datum MD =
91.5#, 1+40,
�U=19
Datum TV D - 8809 SS
.124'
LATCH
FORT DATE
10-314' CSG, 45.5#. NT -80 BTC, 1)= 9.950' 3627'
4053
Minimum 1)=3.80'@ 8551' 1
4-112' BKR MONOBORE WHPSTOCK w/RA 8551'
TAGS (02/27/19)
[7_5/8" CSG, 29.7#—,L 8-0 NSCC, D = 6.875'_-1— ----8551''
!a 4-12" TBG, 12.6i#, L-80 NSCC, —8551'
.0152 trpf, D — 3.958" j —_--- —
PBRFORATICIN SUMMARY
REF LOG
ON
ANGLEAT TOP P62F:
Note: Refer to Production DB for historical perf data
SIZE SPF M RVAL Opn/Sgz SHOT I SQ
4-1/2' 8551 - 8742 OH
Li
ro°
/2' HES HXO SSSV NP. D = 3.813°
GAS LIFT MANDRELS
ST
ND
TVD
DEV
TYPE
VLV
LATCH
FORT DATE
3
4053
4048
0
NER
DW
BK
0 08125/17
2
6731
6726
0
NER
DW
BK
0 08/25/17
1
8126
8120
0
MR i
DW( i
BK
0 08/25/17
—7200 TOC (0127119)
Cement in Tbg from 8500' MD to
7800' MD
�4-12 OPEN HOLE 8742'
DATE REV BY COMMENTS
DATE REV BY COMMENTS
09/11195 N28E ORIGINAL COMPLETION
07/05/01 NORDIC 1 CTD SIDETRACK (E -35A)
12/07110 NORDIC 1 CTD SIDETRACK (E -35B)
05113/19 N-COR2 CTD OPS SHUTDOWN (E -35C)
05/15/19 ZB/JMD EDITS TO OPS SHUTDOWN
105/23/191 ZB/JNU I MAL ODE APPROVAL 11
PRUDHOE BAY UNIT
WELL E -35C
PERNTT No: 219-049
AR No: 50-029-22557-04
SEC 6, T11 N, RUE, 1187' FNL & 501' FEL
BP Exploration (Alaska)
3
STATE OF ALASKA MAY 2 9
ASKA OIL AND GAS CONSERVATION COMMIS; 20
9
REPORT OF SUNDRY WELL OPERATION j L J
1. Operations Performed ��°"�
Abandon ElPlug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ElOperations'sh'u @� 72
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work5.
Development II
Stratigraphic ❑
Exploratory El
Service ❑
Permit to Drill Number: 219-049
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
6. API Number: 50-029-22557-04-00
7. Property Designation (Lease Number): ADL 028304
8.
Well Name and Number: PBU E -35C
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
MWD / GR / RES
10.
Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
None feet
measured
Conductor
Total Depth: measured
8742
feet
Plugs
true vertical
8703
feet
Junk
Effective Depth: measured
8742
feet
Packer
true vertical
8703
feet
Packer
Casing: Length: Size: MD
Structural
None feet
measured
Conductor
80
20"
Surface
3592
10-3/4"
Intermediate
8518
7-5/8"
Production
Liner
Perforation Depth:
Measured depth:
None
True vertical depth:
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and
true vertical depth)
feet
feet
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
35-115
35-3627
33-8551
4-1/2" 12.6# L-80
None
measured
None feet
measured
None feet
measured
None feet
true vertical
feet
TVD: Burst
35-115 1490
35-3622 4560
33-8531 6890
31 -8551
31 -8531
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl I Casing Pressure
Prior to well operation: Op Shutdown
Subsequent to operation: Oo Shutdown
14. Attachments: (required per 20 AAc 25 070 25 071, a 25 283) 15. Well Class after work:
Daily Report of Well Operations Q Exploratory ❑ Development p
Copies of Logs and Surveys Run RI 16. Well Status after work: Oil 2 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
Collapse:
470
1730
4790
Tubing Pressure
Service ❑ Stratigraphic ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
319-248
Authorized Name: Lastufka, Joseph N Contact Name: Browning, Zachary H
Authorized Title: IM Special' Contact Email: Zachary. Brown inqobp. com
Authorized Signature: Date: JZq /I Contact Phone: +1 907 564 5220
Form 10-404 Revised 04/2017 `'0107 ;I MS(�``ip.AY 3 01019 Submit Original Only
North America - ALASKA - BP
Operation Summary Report
Page 1 of 13
Common Well Name: E-35
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Project: PBU
Site: E
Rig Name/No.: CDR -2
Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
5/5/2019 18:00 20:30
2.50
MOB
P PRE
FINISH RIG DOWN
l
PULL RIG OFF WELL. INSTALL JEEPS
20:30 - 00:00
3.50
MOB
P PRE
MOVE RIG FROM DS15 TO E -PAD. 11.6 MILE
I
MOVE
5/6/2019 00:00 03:00
3.00
MOB
P PRE
REMOVE JEEPS.
PJSM. SPOT SUB AND MUD MODULE
***RIG ACCEPTED AT 03:_00*'*
03:00 08:00
5.00
RIGU
P PRE
BEGIN RU OPS
OPEN TREE VALVES TO MONITOR THERMAL
EXPANSION ON TREE.
PERFORM PASSING LTT TO 3500#
REMOVE TREE CAP, INSTALL BOPS.
08:00 11:30
T 3.50
BOPSUR
P PRE
MAKE UP TEST JOINT, PREP FOR BOP TEST.
FINISH RIG UP CHECKLISTS.
GREASE CREW SERVICES TREE VALVES AND
TORQUED TREE BOLTS
11:30 13:30
2.00
BOPSUR
P PRE
FLUID PACK LINES.
REVIEW PROCEDURE FOR BOP TEST.
REVIEW VALVE ALIGNMENT.
FLUSH AND FLUID PACK LINES.
— —
GET GOOD SHELL TEST TO 4500 PSI.
13:30 20:30
7.00
BOPSUR
P PRE
TEST BOPS AS PER BP AND AOGCC REGS.
TEST IS WITNESSED BY WSL AND
TOOLPUSHER, AOGCC BOB NOBLE
DECLINES WITNESS.
ANNULAR TESTED WITH 2" AND 3.5" TEST
JOINT. VARIABLES TESTED WITH 2.375" AND
3.5" TEST JOINT
ALL TESTS TO 250 / 3500 PSI.
TEST 1: IRV, STRIPPER, C9, C10
BACKWARDS - PASS.
TEST 2: BLIND / SHEARS, R1, BL1A, B1, B4 -
FAIL ON B1. BLEED OFF AND GREASE B1.
RETEST 2 - PASS. FAIL / PASS ON B1.
TEST 3: ANNULAR (2"), TIW 1, B3, B2, BL1 -
PASS
TEST 4: UPPER 2" PIPE / SLIPS, TIW 2, BL2,
T2, C15 - PASS
TEST 5: C16, T1, C11- PASS
TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2
PASS
TEST 7: LOWER 2" PIPE / SLIP, C5, C6, C8,
TV1- PASS
TEST 8: CHOKE A, CHOKE C- PASS
PERFORM ACCUMULATOR DRAW DOWN.
TEST 9: ANNULAR (3-1/2"), C1, C4 PASS
TEST 10: VARIABLES (3-1/2"), C2, C3 PASS
2030 2230
2 00
BOPSUR
P PRE
RIG DOWN TEST EQUIPMENT.
REMOVE TEST RISERS AND INSTALL
DRILLING RISERS
VALVE CHECKLIST.
TAKE RKB MEASUREMENTS FOR STACK
DRAWING
Printed 5/28/2019 10.33 27AM **All depths reported in Drillers Depths"
j
-4-
07 00
North America - ALASKA - BP
Page 2 of 13
02_30 03:00
Operation Summary Report
PRE INSTALL FLOATS IN UQC. STAB INJECTOR.
Common Well Name: E-35
-
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Project: PBU
Site: E
MICROMOTIONS.
Rig Name/No.: CDR -2
Spud Date/Time: 6/27/2001 12:00:OOAM
I Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
SYSTEM TO STORAGE PITS, PERSONAL H2S
I BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(u_sft)
22:30 00:00 1.50
BOPSUR N PRE
PJSM,
BRING VALVE CREW LUBRICATOR ON TO
RIG.
EVACUATE STACK TAKE MEASUREMENT TO
CLOSED SWAB
RIG UP EXTENSIONS /PULLING TOOL
STAB LUBRICATOR,
5/7/2019 00:00 - 02:30 2.50
WHSUR P PRE
PJSM, REVIEW COMMAND AND CONTROL
FOR TESTING LUBRICATOR
FLUID PACK TO TIGER TANK WITH
METHANOL.
PRESSURE TEST LUBRICATOR TO 3500#.
TOOK EXTENDED AMOUNT OF TIME FOR
PRESSURE TO STABILIZE DUE TO PRESSURE
RISING. (THERMAL)
TEST PASSED.
PULL TWC WITH 0# ON WELL. WELL WAS
STATIC
CLOSE MASTER/ SWAB. LTT. BLOW
LUBRICATOR DOWN TO TIGER TANK.
RECOVER TWC WITH SEAL INTACT.
OFFLOAD VALVE CREW EQUIPMENT
j
-4-
07 00
NORMALIZE MAST
02_30 03:00
0.50 RIGU P—
PRE INSTALL FLOATS IN UQC. STAB INJECTOR.
03:00 04:30
1.50 RIGU P
PRE PRE SPUD WITH WARDS CREW, LINE UP TO
PUMP FORWARD AND CHECK
MICROMOTIONS.
04:30 07:00
2.50 RIGU N
PRE WHILE TRANSFERRING MUD FROM ACTIVE
SYSTEM TO STORAGE PITS, PERSONAL H2S
MONITORS DETECT H2S IN THE PUMP ROOM.
0 READINGS SEEN ON RIG SENSORS-
ENSORS.
07'00 - 09.30 2.50 RIGU
SWEEP THE RIG WITH 4 -GAS HANDHELD
DETECTORS, A MAX READING OF 42 PPM IS
SEEN IN THE PUMP ROOM JUST ABOVE THE
STORAGE PIT.
EVACUATE RIG, ALL CREWS MUSTER AND
ACCOUNTED FOR.
MAKE NOTIFICATIONS TO CT SUPT, PAD OF
AND WOS.
DISCUSS PLAN FOR RE-ENTERING RIG WITH
GWO HSE AND BP, NABORS SUPT_
N PRE ASST FIRE CHIEF+ FIRE CREWARRIVE
FROM BOC TO SWEEP RIG. MAX READING
OF 7 PPM H2S JUST ABOVE STORAGE PIT,
ZEROS EVERYWHERE ELSE.
DISCUSS PLAN FORWARD WITH CTD SUPT,
AGREE TO OFFLOAD ALL MUD FROM RIG AND
FLUSH ALL LINES AND PITS.
09:30 11'30 200 RIGU N PRE VAC TRUCKS ARRIVE WITH H2S SCAVENGER
PILLABOARD. HOOKUPTRUCKSAND
REMOVE ALL MUD FROM RIG. WHILE
REMOVING MUD FIRE CHIEF AND 1 FIRE
CREW STAND BY TO ASSIST. AFTER MUD IS
OFF RIG SWEEP PIT AREAAGAIN WITH
HANDHELD 4 -GAS MONITOR ALL CLEAR.
RECEIVE APPROVAL TO RE-ENTER RIG WITH
CREWS.
Printed 5/28/2019 10.33.27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 3 of 13
Common Well Name: E-35
01:00
1.00
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Project: PBU
Site: E
- 03:00
0.50
Rig Name/No.: CDR -2
Spud Date/Time: 6/27/2001 12:00:OOAM
09:00
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
111:30 - 14:00 2.50
RIGU N
PRE
CREW CHANGE AND VALVE CHECKLIST.
REVIEW INCIDENT WITH ONCOMING CREW
AND PLAN FORWARD.
GET MORE NO-SULF (H2S SCAVENGER) OUT
-
14:00 22:00 8.00
_
RIGU N I
PRE
AND MIX IT WITH 130 BBLS FRESH WATER_.
REVIEW PROCEDURE FOR FLUSHING PITS
AND LINES WITH RIG CREW.
FLUSH PITS AND LINES WITH NO-SULF+
CAUSTIC THEN WITH FRESH WATER.
SIMOPS - HYDRA RIG TECHNICIAN INSPECT
INJECTOR WHILE FLUSHING PITS.
SIMOPS - PT LUBRICATORS AND FLOATS TO
3500#. MAKE UP LOWER PORTION OF BHA.
22:00 00 00 2 00
RIGU N
PRE
CIRCULATE PIT TO PIT TO VERIFY
MICROMOTIONS.
SWAP COIL OVER TO 1% KCL
5/8/2019 00:00
01:00
1.00
RIGU
01:00
02:30
1.50
RIGU
02:30
- 03:00
0.50
STWHIP
03:00
09:00
6.00
STWHIP
N PRE
FINISH CIRCULATING COIL TO KCL.
N PRE
PERFORM AAR WITH WARDS CREW.
P WEXIT
PERFORM FLOW CHECK. STATIC. PJSM
FOR BHA MAKEUP
P 8,553.00 WEXIT
MAKE UP BHA#1
RIH WITH MILLING BHA#1
RATE: 0.50 BPM IN 0.45 BPM OUT. CIRC
0900 - 1430 550 STWHIP P
PRESSURE: 500 PSI
MUD WEIGHT: 8.39 PPG IN, 8.25 PPG OUT
INJECTOR ON 03:45
RIH, DISPLACE PUMP KCL MIN RATE TAKE
RETURNS OUT TO TIGER TANK.
TIE IN DEPTH FROM 8150', CORRECT -8'.
LIGHT TAG AT 8553'.
PICK UP AND CLOSE EDC, PUMP 10 BBLS
THEN OPEN EDC AGAIN FOR FLUID SWAP.
(EDC CIRC PORTS ARE 103 FT ABOVE BIT)
- SWAP WELL TO WATER THEN TO MUD.
PURGE RISER.
-AFTER MUD ALL THE WAYAROUND 10 MIN
FLOWCHECK IS GOOD, NO FLOW.
8,553.00 WEXIT BRING PUMPS TO 2.4 BPM, START CLOSING
CHOKE FOR 10.55 PPG AT WINDOW.
EASE DOWN TO 8551' AND START TIME
MILLING.
MILL 3.80" WINDOW IN 4-1/2" X 7-5/8"
' CASING/LINER PER BAKER REP FROM 8551'
MD TO 8554' MD
RATE: 2.39 BPM IN, 2.40 BPM OUT
MUD WEIGHT: 8.60 PPG IN, 8.51 PPG OUT
DWOB: 2 - 3 KLBS
CIRC PRESSURE: 3800 - 3900 PSI
KEEP ECD AT 10.55 PPG WHILE MILLING
WINDOW
- START ADDING BAROID BLACK PRODUCTS
TO MUD TO HELP WITH KINGAK EXIT
Printed 5/28/2019 10.33.27AM **All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Common Well Name: E-35 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019 X3 -0199H -C: (3,513,240.00)
Project: PBU Site: E --- --
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:OOAM Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Page 4 of 13
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
hr (usft)
- _ — + -- --
14:30 17:00 2.50 STWHIP N 1 8,584.00
- -
WEXIT BLACK PRODUCT COMES BACK AND BLINDS
I !
OFF SHAKER SCREENS.
TREAT SCREENS WITH BAROID SCREEN
CLEAN, NOT EFFECTIVE. ABOUT 60 - 70
BBUHR LOSSES OVER THE END OF THE
SCREEN AT 2.1 BPM.
CUTTINGS BOX FILLS UP, PICK UP OFF
BOTTOM AND CIRC AT MIN RATE, WAIT FOR
LARGER MESH SCREENS.
MAINTAIN > 10.55 PPG AT WINDOW WHILE
CIRCULATING.
SUPER SUCKERS ARRIVE AND EMPTY
CUTTINGS BOX.
--__
17:00 00:00 7.00 STWHIP P 8,560.00
WEXIT MILL 3.80" WINDOW IN 4-1/2" X 7-5/8"
' CASING/LINER PER BAKER REP FROM 8554'
MD TO 8560' MD
RATE: 2.39 BPM IN, 2.40 BPM OUT
MUD WEIGHT: 8.65 PPG IN, 8.57 PPG OUT
DWOB: 2 - 3 KLBS
CIRC PRESSURE: 4000 - 4200 PSI
5/9/2019 0000 0700 7.00 STWHIP P 8,564.00
WEXIT MILL 3.80" WINDOW IN 4-1/2" X 7-5/8"
CASING/LINER PER BAKER REP FROM 8560'
MD TO 8564' MD
RATE: 2.39 BPM IN, 2.40 BPM OUT
MUD WEIGHT: 8.65 PPG IN, 8.57 PPG OUT
DWOB: 2 - 3.9 KLBS
CIRC PRESSURE: 4200 - 4350 PSI
0700 11:00 4.00 STWHIP P 8,564.00
WEXIT PICK UP AND REAM WINDOW.
CLEAN PASS UP AND DOWN.
MILL 3.80" WINDOW AND RATHOLE IN 4-1/2" X
7-5/8" CASING/LINER PER BAKER REP FROM
8563' MD TO 8571.5' MD
RATE: 2.38 BPM IN, 2.40 BPM OUT
MUD WEIGHT: 8.67 PPG IN, 8.57 PPG OUT
DWOB: 2 - 3 KLBS
CIRC PRESSURE: 4200 - 4350 PSI
GETTING BETTER MOTOR WORKAND
PROGRESS SINCE THE PICKUP.
PUMP 5 BBLS LO / HI SWEEPS AROUND.
MILL TO END OF RATHOLE AT 8571.5' TOTAL
OF 10 FT WINDOW + 10 FT RATHOLE.
11:00 13:30 2.50 STWHIP P 8,571.50
WEXIT CONDUCT REAMING PASS UP AT 1 FT/MIN,
NOTHING SEEN. VERY SLIGHT MOTOR
WORK WITH NO DWOB AT 8553'.
DOWN PASS NOTHING SEEN.
UP PASS SAME SLIGHT MOTOR WORK AT
8553'.
DRY DRIFT IS CLEAN, TAG AT 8571.5'.
PICKUP ABOVE WINDOWAND OPEN EDC.
PUMP 2.44 BPM @ 4000 PSI WHILE WAITING
FOR 10.5# TO REACH BIT.
START 10.6# MUD DOWN CT.
CLOSE EDC AND GET MUD OUT THE BIT
THEN OPEN ITAGAIN FOR REST OF FLUID
SWAP.
DYNAMIC FLOW CHECK ON BOTTOM IS
GOOD.
Printed 5/28/2019 10 33:27AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 5 of 13
Common Well Name: E-35
OPEN EDC, POH
-
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/5/2019
End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00 )
Project: PBU
-
15:30 16:30 1.00 STWHIP P8,571.50
WEXIT MONITOR WELL FOR 10 MINUTES AT BHA:
Site: E
Rig Name/No.: CDR -2
Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
INJECTOR OFF: 15:40
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
GO. --- -
16:30 17:00 0.50 STWHIP j P 8,571.50
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
HOLD PJSM WITH LRS AND RIG CREW
_
r13:30 15:30 2.00
-- --
STWHIP P
-(usft) -
8,571.50 WEXIT
POOH
WELLHEAD.
TEST 1
MUD WEIGHT: 10.64 PPG IN, 8.57 PPG OUT
-PUMP 2 BBLS OF DIESELAT 30 DEGREES TO
ACHIEVE 2744 PSI INITIAL TEST PRESSURE
RATE: 2.15 BPM IN, 1.93 BPM OUT
Printed 5/28/2019 10:33.27AM **All depths reported in Drillers Depths**
OPEN EDC, POH
RATE: 2.16 BPM. CIRC PRESSURE: 3900 PSI
MAINTAIN 10.7 PPG FOR THE TRIP OUT,
UNTIL NEAR SURFACE.
-
15:30 16:30 1.00 STWHIP P8,571.50
WEXIT MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
CLOSE EDC, POWER DOWN
INJECTOR OFF: 15:40
MILLAND REAMER ARE 3.79" NO-GO, 3.80"
- - - - - -- - --- ' -- — - -
GO. --- -
16:30 17:00 0.50 STWHIP j P 8,571.50
WEXIT MAKEUP AND STAND BACK DRILLING BHA
17:00 20:30 3.50 STWHIP P 8,571.50
WEXIT MIT IA TO 2500 PSI
HOLD PJSM WITH LRS AND RIG CREW
-RIG UP LITTLE RED SERVICES TO PUMP
DOWN IA, AND MONITOR IA, OAAND
WELLHEAD.
TEST 1
-PUMP 2 BBLS OF DIESELAT 30 DEGREES TO
ACHIEVE 2744 PSI INITIAL TEST PRESSURE
AT 15 MINUTES PRESSURE WAS 2646 PSI
AT 30 MINUTES PRESSURE WAS 2596 PSI
AT 45 MINUTES PRESSURE WAS 2556 PSI -
NOT MEETING BP CRITERIA FOR A PASSING
TEST
TEST 2
-PUMP 0.2 BBLS OF DIESEL TO REPRESSURE
TO 2741 PSI
AT 15 MINUTES PRESSURE WAS 2700 PSI
AT 30 MINUTES PRESSURE WAS 2665 PSI
AT 45 MINUTES PRESSURE WAS 2635 PSI -
NOT MEETING BP CRITERIA FOR A PASSING
TEST
-DISCUSS RESULTS WITH ODE AND DECIDE
TO END TEST AND START LEVEL 2 OCN FOR
CONTINUING OPERATIONS.
-BLEED BACK TEST PRESSURE
-OPEN CHOKE AND MONITOR WELL FOR 10
MINUTES NO FLOW, NO PRESSURE
--OPEN BLINDS
20.30 21.30 1.00 DRILL P 8,571.50
PROD1 MAKE UP DRILLING BHA
-HOLD PJSM WITH CREW
-RUN BHA IN HOLE AND MAKE UP INJECTOR
-INJECTOR ON AT 2050 HRS
-TEST INJECTOR QTS TO 3500 PSI -GOOD
_TEST
21 30 2345 225 DRILL P 8,571 50
PROD1 RIH
-PUMPING AT MIN RATE .23 BPM AT 1200 PSI
WITH 8.6 PPG IN AND 10.5 OUT
-LOG TIE IN AT 8099'-8137' CORRECTED -9'
-_CONTINUE RIH TO 8545'
2345 00:00 0.25 DRILL P 8,571.50
PROD1 DISPLACE WELL TO 8.6 PPG QUICK DRILL N
-INCREASE PUMP RATE TO HOLD 11.3 PPG
ECD WHILE DISPLACING WELL, WITH 10
BBLS OF 8.6 PPG FLUID OUT OF PIPE START
MOVING UP HOLE TO RELIEVE ECD AT
WINDOW. -
Printed 5/28/2019 10:33.27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 6 of 13
Common Well Name: E-35
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
-- - - (hr) (usft)
5/10/2019 00:00 01:15 1.25 DRILL P 8,571.50 PROD1
DISPLACE WELL TO 8.6 PPG QUICK DRILL N
-INCREASE PUMP RATE TO HOLD 11.3 PPG
ECD WHILE DISPLACING WELL, WITH 10
BBLS OF 8.6 PPG FLUID OUT OF PIPE START
MOVING UP HOLE TO RELIEVE ECD AT
WINDOW.
NOTE: HAD TO SLOW DOWN PUMPS TO KEEP
MUD ON SHAKERS DUE TO MUD BEING
COAGULATED WITH ASPHALTINES AND
BLINDING OFF THE SCREENS.
LL -WE MAY WANT TO CONSIDER DROPPING
CONCENTRATION OF BARATROLAND SULTEX
IN HEAVY FLUIDS FOR KINGAK SECTION.
01 15 08:30 7.25 DRILL P 8,621.00 PROD1
'DRILL FROM 8572=8636'
-COME OFF PUMPS TRAPPING PRESSURE TO
MAINTAIN 10.8 PPG ECD AND CLOSE EDC
-PICK UP WT 32K DOWN WT 23K
I -BRING PUMPS ONLINE AT 2.2 BPM AT 4000
PSI FREE SPIN MW 8.75 PPG IN 8.67 PPG OUT
MAINTAINING AN ECD OF 10.75 PPG
-BPM IN 2.2 / OUT 2.24
-BHA WIPER TRIPS EVERY 50' DRILLED.
AT 8630' PUMP 5 BBLS LO / HI VIS SWEEPS.
AT 8632' BRIEF DRILLING BREAK. DISCUSS
WITH GEO, KEEP DRILLING PUMP UP
SAMPLE.
- AT 8636' SEE CHOKE IS PARTIALLY
PLUGGING, PULL THROUGH WINDOWAND
OPEN EDC, PUMP B/U.
- PERFORM JOG ABOVE WHIPSTOCK THEN
OPEN EDC.
- PUMP B/U AT 2.5 BPM THEN SHUT DOWM,
TRAP PRESSURE AND PURGE OUT MM AND
CHOKE
- PASS THROUGH WINDOW AT 180L, 0 PUMP,
20 FT/MIN WITH NO ISSUES.
0830 12.00 3.50 DRILL P 8,643.00 PROD1
DRILL 4.25" BUILD FROM 8636' MD TO 8643'
MD
FREE SPIN: 4160 PSI, 2.02 BPM
RATE: 2.02 BPM IN, 2.02 BPM OUT. CIRC
PRESSUREA100 - 4350 PSI
MUD WEIGHT: 8.82 PPG IN, 8.74 PPG OUT,
ECD: 10.6 -10.7 PPG AT WINDOW
- TRY SWAPPING HIGH PRESSURE FILTERS,
NO EFFECT ON HIGH CIRC PRESSURE.
- TRY REDUCING CHOKE AND INCREASING
CIRC RATE, NOTABLE TO INCREASE CIRC
RATE ENOUGH TO MAKE UP FOR REDUCED
CHOKE PRESSURE.
ROP: 8 - 30 FT/HR, WOB: 2 - 4 KLBS
AT 8643' CHOKE PRESSURE IS
FLUCTUATING > 200 PSI.
- PICK UP THROUGH WINDOW TO PURGE
CHOKE AGAIN.
BRING VAC TRUCK OUT TO PERFORM 150
BBLS DUMP AND DILUTE TO GET THE MUD
DENSITY DOWN, 8.7# HEAVY NOW.
- NOT DRILLING WELLAT 2 BPM.
Printed 5/28/2019 10 33 27A "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 7 of 13
Common Well Name: E-35
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI. USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
12:00 13:30 1.50 DRILL P 8,643.00 PROD1
CHOKE STILL SHOWING > 200 PSI PRESSURE
FLUCTUATIONS AFTER PURGING WITH AIR 2
TIMES.
PULLABOVE WINDOW AND PUMP 2X B/U.
TRAP PRESSURE AND SHUT DOWN, SHUT IN
WELL. INSPECT CHOKE CONE AND SEAT.
CONE AND SEAT LOOK OK. SNAKE OUT MM
WITH E -LINE BOTH TUBES, OK.
PRESSURE TEST CHOKE B AND CAP THAT
WAS OPENED UP, GOOD.
CIRC DILUTED MUD TO BIT AND CLOSE
ECD.
1330 1800 4.50 DRILL P 8,621.00
PROD1
- PASS THROUGH WINDOWAT 180L, 0 PUMP,
10 FT/MIN WITH NO ISSUES.
'DRILL 4.25" BUILD FROM 8643' MD TO 8673'
MD
FREE SPIN: 3900 PSI, 2.13 BPM
RATE: 2.14 BPM IN, 2.14 BPM OUT. CIRC
PRESSURE: 3900-4150 PSI
MUD WEIGHT: 8.75 PPG IN, 8.72 PPG OUT,
ECD: 10.6 -10.7 PPG AT WINDOW
ROP 10 - 15 FT/HR.
CONDUCT FREQUENT SHORT PICKUPS.
PUMP 3 EA LO VIS SWEEPS 5 BBLS EACH
'TO START THINNING THE MUD TO 20K LSRV
AS PER OCN#5.
18:00 23:15 5.25
DRILL P 8,742.00 PROD1
DRILL 4.25" BUILD FROM 8673' MD TO 8742'
MD
FREE SPIN: 3900 PSI, 2.13 BPM
RATE: 2.14 BPM IN, 2.14 BPM OUT. CIRC
PRESSURE: 3900-4150 PSI
MUD WEIGHT: 8.75 PPG IN, 8.72 PPG OUT,
ECD: 10.6 - 10.9PPG AT WINDOW
ROP 10-25 FT/HR.
CONDUCT FREQUENT SHORT PICKUPS.
-CONDUCT BHA WIPER TRIPS EVERY 50'
DRILLED AND LONG WIPER TRIPS AT EVERY
100' DRILLED
- PUMP 5 BBL LO VIS SWEEPS TO THIN THE
MUD TO 20K LSRV AS PER OCN#5.
23 15 0000 075 DRILL P 8,742.00 PROD1
LONG WIPER TRIP FROM 8742'
-5X5 BBL LO/HI VIS SWEEP AT BIT AT 8742'
-POOH TO BELOW WHIPSTOCK ORIENT
TOOLFACE 180 DEGREE REDUCE PUMP
RATE TO 0.25 AT 1786 PSI
-PULL THOUGH WINDOW WITH NO ISSUES
-INCREASE PUMP RATE TO 2.1 BPM
- PERFORM JOG ABOVE WHIPSTOCK THEN
OPEN EDC WITH 10X10 BBL LO/HI VIS SWEEP
AT EDC
- PUMP B/U AT 2.5 BPM WHILE JOGGING TO
8287' UNTIL SWEEP AT SURFACE
Printed 5/28/2019 10 33:27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 8 of 13
Operation Summary Report
Common Well Name: E-35
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019
X3-0199H-C: (3,513,240.00)
-p - - -
Project: PBU Site: E
Rig Name/No.: CDR-2 Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUO1: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
5/11/2019 00:00 03:45 r 3.75 DRILL P 8,742.00 PROD1
LONG WIPER TRIP FROM 8742'
PUMP B/U AT 2.5 BPM WHILE JOGGING TO
8287' UNTIL SWEEP AT SURFACE -WITH
SWEEP AT SURFACE 20% INCREASE IN
CUTTINGS.
-RUN BACK IN HOLE TO WINDOW, TIE IN TO
RA TAG CORRECTION -1' AND ATTEMPT TO
JET TRAY SET DOWN TWICE AT 8605' WITH
AS DRILLED TOOL FACE.
-PULLABOVE WINDOW, STOP PUMPS
TRAPPING PRESSURE TO MAINTIAN 10.7 ECD
-CLOSE EDC
-RUN THROUGH WINDOW AT 180° WITH NO
ISSUES
-COME BACK ON WITH PUMPS AT 0.5 BPM AT
1864 PSI AND RIH WITH AS DRILLED TOOL
FACE-STILL TAKING WEIGHT AT 8603',
INCREASE PUMP RATE TO 1 BPM AT 2317 PSI
AND RIH STILL TAKING WEIGHT AT 8603.
-DISCUSS SITUATION WITH ODE.AND DAY
WSL.
-REDUCE PUMP RATE TO 0.2 BPM AND PULL
THROUGH WINDOW CLEAN
-STOP PUMPING AND OPEN EDC WITH
TRAPPED PRESSURE TO MAINTIAN 10.7 ECD
-BRING PUMPS UP TO 2.3 BPM AT 4100 PSI
WITH SWEEP OUT EDC PLUS 10 BBLS CHASE
SWEEP TO 6500' WITH -SWEEP AT SURFACE
NO NOTICABLE INCREASE IN CUTTINGS.
-RUN BACK IN HOLE TO WINDOW
-AT WINDOW, STOP PUMPS TRAPPING
PRESSURE TO MAINTIAN 10.7 ECD
-CLOSE EDC
-RUN THROUGH WINDOW AT 180° WITH NO
ISSUES
-COME BACK ON WITH PUMPS AT 2.1 BPM AT
4078 PSI AND RIH WITH AS DRILLED TOOL
FACE, TAKING WEIGHT AT 8603'
Printed 5/28/2019 10:33 27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Common Well Name: E-35
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019
AFE No
X3 -0199H -C: (3,513,240.00)
Page 9 of 13
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
03:45 06:00 2.25 DRILL N 8,742.00
PROD1 WORK THROUGH TIGHT SPOT AT 8603'
FREE SPIN: 4150 PSI, 2.10 BPM
RATE: 2.11 BPM IN, 2.14 BPM OUT. CIRC
PRESSURE: 4150-4300 PSI
MUD WEIGHT: 8.81 PPG IN, 8.71 PPG OUT,
ECD: 10.6 - 10.9PPG AT WINDOW
-TAKE 2' BITE AND PU AND REPEAT. AT 1 FPM
OBSERVED MOTOR WORK FOR THE FIRST 3'
AND THEN DROPPED OFF.
'-WORK THROUGH AREAAGAIN AT 5 FPM NO
MOTOR WORK OBSERVED
-PICK BACK UP TO 8597, LOWER PUMP RATE
TO 0.25 BPM AND RIH TAKING WEIGHT AT
8607'
-PICK BACK UP TO 8598, RAISE PUMP RATE
TO 1 BPM AND RIH TAKING WEIGHT AT 8612'
-PICK BACK UP TO 8600, KEEP PUMP RATE AT
1 BPM AND RIH TAKING WEIGHT AT 8612'
-PICK BACK UP TO 8601, RAISE PUMP RATE
TO 2. BPMAND RIH TAKING WEIGHTAT 8612',
8617'8624' PICKING UP AND WORKING
THROUGH EACH AREA. PUMP 5X5 BBL LO/HI
VIS SWEEP.
-GETTING CHUNKY CUTTINGS BACKAT
SHAKER DISCUSS WITH ODE TO PULL ABOVE
WINDOW AND CLEAR CUTTINGS FROM
ABOVE US, CALL TRUCK TO FACIILITATE MUD
- -- i-
SWAP_- -- - -
06 00 10.30 4.50 DRILL N 8,742.00
PROD1 DISCUSS PLAN FOR MUD SWAP WITH MUD
ENGINEER AND ODE. DECISION IS MADE TO
SWAP TO A 9.5# SYSTEM.
RUN BACK DOWN TO CHECK HOLE
CONDITIONS WHILE NEW MUD SYSTEM IS
BEING BUILT.
PASS THROUGH WINDOW AT 180L, 0 PUMP,
15 FT/MIN WITH NO ISSUES.
TIE-IN DEPTH FROM 8580'.
STACK OUT AT 8588'. PICKUP AND GO
THROUGH AT 5 FT/MIN. HOLD 11.1 ECD
WHILE RIH.
STACKAT 8613', PICKUP IS 35K.
CONTINUE WORKING DOWN.
AT 8623' SET DOWN, PICKUP IS 48K WITH
-11 K ON DWOB.
CONTINUE TO PICKUP, DRAGGING HEAVY
WITH MOTOR WORK THEN POPS FREE.
CONTINUE PICKING UP TO WINDOW.
PULL THROUGH WINDOW AND PUMP B/U TO
CLEAR TUBING.
LARGE AMOUNT OF CUTTINGS COMING
BACK FOR 2X B/U.
RUN DOWN TO JUST ABOVE WINDOWAND
CLOSE EDC.
Printed 5/28/2019 10 33 27A
**All depths reported in Drillers Depths**
North America - ALASKA - BP Page 10 of 13
Operation Summary Report
Common Well Name: E-35 i AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019 X3 -0199H -C: (3,513,240.00 )
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:OOAM Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
_ _ (usft)
10:30 - 13:00 r 2.50 DRILL N 8,742.00 PROD1 PASS THROUGH WINDOWAT 180L, 0 PUMP,
�20 FT/MIN WITH NO ISSUES.
TAG AT 8616' AND PICKUP, -9K AT BIT.
13.00 - 1730 4.50 1 DRILL
WASH DOWN TO 8623' AND TAG, PICKUP IS
CLEAN, ANNULAR PRESSURE SPIKES.
PICK UP AND CIRCULATE THEN TRY AGAIN.
WASH THROUGH TO 8624' AND LIGHT TAG,
PICKUP IS HEAVY -12KON DWOB.
PICK UP TO WINDOW AND CIRC THIS LOAD
UP THE HOLE, CONTINUE KEEPING 11.1#
ECD.
WASH DOWN TO 8626' TAG AND STALL.
PICK UP TO WINDOW. PULL THROUGH
WINDOW AND PERFORM 50' JOG THEN OPEN
EDC.
LARGE AMOUNT OF CUTTINGS COMING
BACK FOR 2X B/U,
N 8,742.00 PROD1 'CLOSE EDC AND RIH, PASS WINDOW WITH
NO ISSUES.
TAG AT 8612' AT 1 BPM, PICK UP AND GO TO
17:30 - 19:00 1.50 DRILL N
19:00 - 00:00 I 5.00 DRILL N
'FULL RATE.
TAG AT 8621', PICKUP IS HEAVY 4K ON
DWOB.
WASH DOWN TO 8626' AND TAG, PICKUP IS
52K WITH -12.9K ON BIT.
PICK UP THROUGH WINDOW AND
CIRCULATE.
DISCUSS WITH ODE, CLEANOUT ISN'T
MAKING MUCH PROGRESS WITH RISK OF
GETTING STUCK.
OPEN EDC, CIRCULATE CASING CLEAN.
WAIT FOR 9.5# MUD FROM PLANT.
8,742.00 PROD1 DISPLACE WELL TO 9.5 PPG MUD
STOP PUMPS TRAPPING 11.1 PPG ECD WITH
CHOKE
OPEN CLOSE EDC
8,74200 PROD1 WORK THROUGH OPEN HOLE SECTION
FROM 8559-8671.4
-PASS THROUGH WINDOW AT 180L, 0 PUMP,
20 FT/MIN WITH NO ISSUES.
- FREE SPIN: 3738 PSI, 2.10 BPM
- RATE: 2.11 BPM IN, 2.13 BPM OUT. CIRC
PRESSURE: 3750-3900 PSI
- MUD WEIGHT: 9.6 PPG IN, 9.5 PPG OUT,
ECD: 10.6 - 10.9PPG AT WINDOW
- WORKING IN HOLE TAKING 2'-4' BITES
WHEN MOTOR WORK IS OBSERVED, PICKING
UP AND RUN BACK THROUGH SECTION
Printed 5/28/2019 10:33.27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 11 of 13
Common Well Name: E-35
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 5/5/2019 End Date: 5/13/2019
X3 -0199H -C: (3,513,240.00)
Site: E
Project: PBU
Rig Name/No.: CDR -2
Spud Date/Time: 6/27/2001 12:00:OOAM
Rig Release: 5/13/2019
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
5/12/2019 00:00 04:30 4.50
DRILL N 8,742.00 PROD1
WORK THROUGH OPEN HOLE SECTION
FROM 8671-8692
-PASS THROUGH WINDOWAT 180L, 0 PUMP,
i
20 FT/MIN WITH NO ISSUES.
- FREE SPIN: 3738 PSI, 2.10 BPM
RATE: 2.11 BPM IN, 2.13 BPM OUT. CIRC
PRESSURE: 3750-3900 PSI
- MUD WEIGHT: 9.6 PPG IN, 9.5 PPG OUT,
ECDA1.1PPG AT WINDOW
WORKING IN HOLE TAKING 2'-4' BITES
WHEN MOTOR WORK IS OBSERVED, PICKING
UP AND RUN BACKTHROUGH SECTION
-PUMPING 5X5 BBL LO/HI VIS SWEEPS AS
NEEDED
NOTE:SEEING LARGER SHALE CUTTINGS AT
SHAKER, DISCUSS WITH ODE, PUMP 5X5 BBL
LO/HI VIS SWEEP AND START WIPER TRIP TO
ABOVE WINDOW
0430 0630 2.00 DRILL N 8,742.00 PROD1 WIPER TRIP TO WINDOW
-PUMP 5X5 BBL LO/HI VIS SWEEP AND START
WIPER TRIP
- RATE: 2.11 BPM IN, 2.13 BPM OUT. CIRC
PRESSURE: 3750-3900 PSI
- MUD WEIGHT: 9.6 PPG IN, 9.5 PPG OUT,
ECD:11.1 PPG AT WINDOW
-POOH TO BELOW WHIPSTOCK ORIENT
TOOLFACE 180 DEGREE REDUCE PUMP
RATE TO 0.25
-PULL THOUGH WINDOW WITH NO ISSUES
-INCREASE PUMP RATE TO 2.1 BPM
- PERFORM JOG ABOVE WHIPSTOCK THEN
OPEN EDC WITH 10X10 BBL LO/HI VIS SWEEP
AT EDC
PUMP B/U AT 2.4 BPM WHILE JOGGING TO
8000' UNTIL SWEEP AT SURFACE
NOTE: CLEAN TRIP THROUGH OPEN HOLE
-TIE IN DEPTH FROM 8100'. CORRECT+10'.
CONTINUE CIRCULATING CASING CLEAN
WITH OPEN EDC AT 2.4 BPM.
LOTS OF CUTTINGS BACK.
06 30 09:30 3 00 DRILL N 8,742.00 PROD1 CLOSE EDC ABOVE WINDOW.
-PASS THROUGH WINDOWAT 180L, 0 PUMP,
15 FT/MIN WITH NO ISSUES.
- STACK WTAT 8623', PICKUP AND WASH
DOWN.
- NOTABLE TO GET BACK TO 8623',
STACKING AT 8620'. PICKUP AND DRAGGING
-4KAT BIT.
PICK UP THROUGH WINDOW AND CIRCULATE
HOLE CLEAN.
PUMP 10 BBLS LO / HI VIS SWEEPS AROUND.
DISCUSS PLAN FORWARD WITH ODE,
DECISION IS MADE TO RUN LINER WITH
MOTOR DUE TO POOR HOLE CONDITIONS.
TIE-IN DEPTH, CORRECT -1 FT.
CIRCULATE WELL CLEAN.
0930 12 00 2.50 DRILL N 8,74200 PROD1 LAY IN 10.5# MUD FROM 8600'.
PULL THROUGH WINDOWAND OPEN EDC,
LAY IN REMAINING MUD TO SURFACE.
POOH.
Printed 5/28/2019 10:33 27AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 12 of 13
Common Well Name: E-35 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date 5/5/2019 End Date: 5/13/2019 X3 -0199H -C: (3,513,240.00)
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00:00AM Rig Release: 5/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
-- (hr) -- (usft)
12:00 13:00 1.00 DRILL N 8,742.00 PROD1 MONITOR WELL FOR 10 MIN AT SURFACE
5/13/2019 00:00 04:30 4.50 RIGID P 8,742.00 POST BLOW DOWN COIL FOR COIL SWAP
PUMP 20 BBLS OF INHIBITED PILL FOLLOWED
WITH 10 BBLS OF METHANOL
HOLD PJSM WITH CREW FOR NITROGEN
BLOW DOWN
PRESSURE TEST NITROGEN LINES T04000
PSI
BLOW DOWN COIL WITH NITROGEN TO
TIGER TANK
ALLOW PRESSURE TO DISAPATE TO TIGER
TANK
REMOVE INJECTOR AND BREAKDOWN
NOZZLE BHA
04.30 0500 0.50 RIGID P 8,742.00 POST PREP FOR RDMO
BLOW DOWN SURFACE LINES
CUT COIL.
Printed 5/28/2019 10 33 27AM `*All depths reported in Drillers Depths**
I
STATIC.
L/D BHA#2. BIT IS 1-1.
13:00 16:00 3.00
DRILL
N
8,742.00
PROD1 PREP TO RUN LINER WITH MOTOR.
REMOVE BHI UQC.
PUMP SLACK OUT. -
16.00 2245 6.75
RIGID
P
8,742.00
POST DECISION IS MADE TO RIG DOWN AND MOVE
TO NEXT WELL.
PJSM WITH CREWS TO DISCUSS PLAN
FORWARD.
MAKE UP NOZZLE FOR FREEZE PROTECT.
'MAKE UP INJECTOR TO WELL.
RIH TO 2500'
RIG UP LITTLE RED SERVICES AND HOLD
PJSM WITH CREWS
LEAK TIGHT TEST LINES TO 250/4000 PSI
GOOD TEST
FREEZE PROTECT WITH DIESEL FROM 2500-
38 BBLS OF DIESEL FOLLOWED BY 5 BBLS
OF MEOH.
22:45 23:00 025
RIGID
P
81742.00
POST SET TWC
FLOW CHECK WELL FOR 10 MINUTES STATIC
HOLD PJSM WITH CREWS
REMOVE INJECTOR AND LAY DOWN NOZZLE
SET TWC WITH T BAR
CLOSE MASTER AND SWAB VALVES
SIMOPS: RIG UP HALLIBURTON N2 UNITAND
MIX INHIBITOR PILL
23:00 00:00 1.00
RIGD
P
8,742.00
POST BLOW DOWN COIL FOR COIL SWAP
MAKE UP NOZZLE
STAB ON INJECTOR AND TEST QTS TO 3500
PSI -GOOD TEST
DISPLACE COIL TO FRESH WATER TAKING
RETURNS TO TIGER TANK
PUMP 20 BBLS OF INHIBITED PILL FOLLOWED
WITH 10 BBLS OF METHANOL
5/13/2019 00:00 04:30 4.50 RIGID P 8,742.00 POST BLOW DOWN COIL FOR COIL SWAP
PUMP 20 BBLS OF INHIBITED PILL FOLLOWED
WITH 10 BBLS OF METHANOL
HOLD PJSM WITH CREW FOR NITROGEN
BLOW DOWN
PRESSURE TEST NITROGEN LINES T04000
PSI
BLOW DOWN COIL WITH NITROGEN TO
TIGER TANK
ALLOW PRESSURE TO DISAPATE TO TIGER
TANK
REMOVE INJECTOR AND BREAKDOWN
NOZZLE BHA
04.30 0500 0.50 RIGID P 8,742.00 POST PREP FOR RDMO
BLOW DOWN SURFACE LINES
CUT COIL.
Printed 5/28/2019 10 33 27AM `*All depths reported in Drillers Depths**
North America - ALASKA - BP Page 13 of 13
Operation Summary Report
Common Well Name: E-35 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/5/2019 End Date: 5/13/2019 X3 -0199H -C: (3,513,240.00)
Project: PBU Site: E
Rig Name/No.: CDR -2 Spud Date/Time: 6/27/2001 12:00 OOAM Rig Release: 5/13/2019
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00000707
Active datum: KB @65.29usft (above Mean Sea Level)
Date From - To Hrs
Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
05:00 11:00 6.00
RIGID
P 8,742.00
POST
PREP FOR LEAK TIGHT TEST.
TRIPLEX NOT WORKING, GET IT SWAPPED
OUT.
MOVE ON TO UNSTABBING PIPE WHILE
WAITING.
INSTALL GRAPPLE.
PJSM WITH CREW FOR UNSTABBING PIPE.
PULL TEST GRAPPLE.
ROLL PIPE OUT OF INJECTOR AND BACK TO
STORAGE REEL.
SECURE PIPE WITH CHAIN AND CUT OFF
TAIL.
RIG DOWN GRAPPLE.
11:00 18:00 7.00
RIGID
P 8,742.00
POST
LEAK TIGHT TEST ON SWAB AND MASTER
VALVE, GOOD
CHANGE OUT BOP RAMS TO 2-3/8"
CONFIGURATION.
CHANGE OUT GRIPPER BLOCKS TO 2-3/8"
REMOVE GOOSENECK AND CHANGE OUT
ROLLERS TO 2-3/8"
18:00 23:59 5.98
RIGID
P 8,742.00
POST
INSTALL GOOSENECK
REMOVE HIGH PRESSURE BULK HEADINNER
REEL IRON
NIPPLE DOWN BOPS
REPLACE PACKOFFS ON INJECTOR
WORK THROUGH RIG DOWN LIST.
LEAK TIGHT TEST TREE CAP TO 3500 PSI
-GOOD TEST
VERIFY ALL VALVES ON WELLHEAD ARE
CLOSED AND 0 PSI ON OAAND IA
RIG RELEASE AT 0000 HRS
"All depths reported in Drillers Depths"
Daily Report of Well Operations
E -35C
ACTIVITYDATF SUMMARY
5/13/2019
T/1/0=0/0/0 Set 4" CIW "H" TWC #431 through stack for CDR 2. FWP's TWC/0/0 see log
for details.
T/I/O=TWC/50/0. Post CDR, RD CDR kill line #2 and CDR tree #3. RU 4" CIW upper tree
torque to API specs. 886 FT/LBS. PT 300 psi low a nd 5000 psi high (PASSED). Pulled 4"
CIW "H" TWC #431 @ 125 ". PT tree cap to 500 psi (PASSED) ***JOB COMPLETE''. See
log for details
***CAUTION** Possible shale/rocks down hole. See picture in well file of debris that was on
5/15/2019
top of TWC.
North America - ALASKA - BP
PBU
E-35
E -35C
500292255704
Design: E -35C
Final Survey Report
14 May, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Site:
E
Well:
E-35
Wellbore:
E -35C
Design:
E -35C
BP
Final Survey Report
Local Coordinate Reference:
Well E-35
TVD Reference:
KB @ 65.29usft (E-35)
MD Reference:
KB @ 65.29usft (E-35)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-UsaAK [4267*15864] Using Well Reference Point
Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor
Site E, TR -11-14
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well E-35, E-35
Well Position +N/ -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore E -35C
Magnetics Model Name Sample Date
BGGM2018 5/1/2019
Design E -35C
Audit Notes:
Version: 1.0
Vertical Section:
Northing:
5,973,160.880 usft
Easting:
662,538.970 usft
Slot Radius:
0.000 in
Northing:
5,975,877.210 usft
Easting:
664,470.460 usft
Wellhead Elevation:
31.51 usft
Declination
16.90
Phase:
ACTUAL
Depth From (TVD)
+N/ -S
(usft)
(usft)
33.78
0.00
Latitude:
Longitude:
Grid Convergence:
Latitude:
Longitude:
Ground Level:
Dip Angle Field Strength
(°) (nT)
80.95 57,430
Tie On Depth: 8,531.22
+E/ -W Direction
(usft) (°)
0.00 234.09
70° 19'59+134 N
148° 40'53.054 W
1.24 '
70° 20'25.430 N
148' 39'54.924 W
29.51 usft
5/14/2019 1:44.31PM Page 2 COMPASS 5000.1 Build 81D
by
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well E-35
Project: PBU
TVD Reference:
KB @ 65.29usft (E-35)
Site: E
MD Reference:
KB @ 65.29usft (E-35)
Well: E-35
North Reference:
True
Wellbore: E -35C
(usft)
Survey Calculation Method:
Minimum Curvature
Design: E -35C
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program
Date 5/14/2019
(usft)
(usft)
From
To
(usft)
(usft)
(usft) Survey (Wellbore) Tool Name
Description
0.00
302.15
8,531.22 E-35PB1 Survey 1 MWD -Standard (E -35P MWD
MWD - Standard
8,551.00
8,742.00 Survey #1 (E -35C) MWD
MWD - Standard
0.00
Survey
MD
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
33.78
0.00
0.00
33.78
-31.51
0.00
0.00
5,975,877.210
664,470.460
0.00
302.15
0.20
57.90
302.15
236.86
0.25
0.40
5,975,877.467
664,470.851
0.07
391.00
0.40
264.60
391.00
325.71
0.30
0.22
5,975,877.517
664,470.673
0.66
480.10
1.10
267.30
480.09
414.80
0.23
-0.94
5,975,877.422
664,469.511
0.79
571.59
2.20
245.00
571.54
506.25
-0.55
-3.41
5,975,876.584
664,467.060
1.37
660.65
3.20
251.40
660.50
595.21
-2.07
-7.32
5,975,874.984
664,463.189
1.17
751.29
3.40
251.90
750.99
685.70
-3.71
-12.27
5,975,873.234
664,458.274
0.22
841.55
4.40
247.70
841.04
775.75
-5.85
-18.02
5,975,870.963
664,452.575
1.15
932.29
7.40
244.60
931.29
866.00
-9.68
-26.52
5,975,866.949
664,444.161
3.32
1,023.32
7.60
255.10
1,021.55
956.26
-13.74
-37.63
5,975,862.644
664,433.140
1.52
1,114.69
7.10
249.00
1,112.17
1,046.88
-17.32
-48.74
5,975,858.825
664,422.111
1.01
1,211.07
6.90
247.40
1,207.83
1,142.54
-21.68
-59.65
5,975,854.227
664,411.305
0.29
1,303.21
6.00
244.20
1,299.38
1,234.09
-25.90
-69.09
5,975,849.798
664,401.955
1.05
1,398.25
4.80
232.00
1,394.00
1,328.71
-30.51
-76.70
5,975,845.023
664,394.452
1.74
1,490.25
3.60
222.60
1,485.76
1,420.47
-35.01
-81.69
5,975,840.419
664,389.564
1.50
1,585.85
2.60
224.40
1,581.22
1,515.93
-38.77
-85.24
5,975,836.583
664,386.099
1.05
1,680.02
2.30
214.30
1,675.30
1,610.01
-41.86
-87.80
5,975,833.441
664,383.608
0.56
1,776.60
1.60
209.60
1,771.82
1,706.53
-44.63
-89.56
5,975,830.630
664,381.911
0.74
1,870.44
1.80
202.80
1,865.62
1,800.33
-47.13
-90.77
5,975,828.106
664,380.748
0.30
1,965.06
1.00
203.20
1,960.21
1,894.92
-49.26
-91.67
5,975,825.958
664,379.894
0.85
2,060.34
1.30
290.10
2,055.48
1,990.19
-49.65
-93.02
5,975,825.536
664,378.560
1.68
V. Sec
(usft)
0.00
-0.47
-0.35
0.63
3.09
7.14
12.11
18.03
27.16
38.54
49.64
61.03
71.16
80.02
86.70
91.78
95.66
98.71
101.16
103.14
104.46
5/14/2019 1:44:31PM Page 3 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company: North America - ALASKA -
BP
Local Co-ordinate Reference:
Well E-35
Project: PBU
TVD Reference:
KB @ 65.29usft (E-35)
Site: E
MD Reference:
KB @ 65.29usft (E-35)
Well: E-35
North Reference:
True
Wellbore: E -35C
Survey Calculation Method:
Minimum Curvature
Design: E -35C
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting DLeg
V. Sec
(usft) (')
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) ('/100usft)
(usft)
2,156.77
2.50
297.10
2,151.86
2,086.57
-48.31
-95.92
5,975,826.806
664,375.632
1.27
106.03
2,251.53
1.10
298.80
2,246.57
2,181.28
-46.94
-98.55
5,975,828.128
664,372.966
1.48
107.35
2,346.33
0.60
289.30
2,341.36
2,276.07
-46.33
-99.82
5,975,828.702
664,371.687
0.55
108.02
2,441.89
0.60
272.90
2,436.91
2,371.62
-46.14
-100.79
5,975,828.871
664,370.711
0.18
108.70
2,537.16
0.60
287.60
2,532.18
2,466.89
-45.97
-101.77
5,975,829.026
664,369.734
0.16
109.39
2,632.91
0.70
280.50
2,627.92
2,562.63
-45.71
-102.82
5,975,829.261
664,368.676
0.13
110.09
2,727.33
0.70
281.40
2,722.33
2,657.04
-45.49
-103.95
5,975,829.455
664,367.539
0.01
110.88
2,823.16
0.60
264.70
2,818.16
2,752.87
-45.42
-105.02
5,975,829.501
664,366.464
0.22
111.70
2,917.52
0.90
263.00
2,912.51
2,847.22
-45.56
-106.25
5,975,829.338
664,365.240
0.32
112.78
3,013.17
0.80
262.40
3,008.15
2,942.86
-45.74
-107.66
5,975,829.128
664,363.837
0.10
114.02
3,106.91
0.60
256.80
3,101.88
3,036.59
-45.93
-108.79
5,975,828.904
664,362.715
0.23
115.05
3,202.85
0.40
241.80
3,197.82
3,132.53
-46.21
-109.57
5,975,828.614
664,361.937
0.25
115.85
3,295.82
0.40
235.50
3,290.78
3,225.49
-48.54
-110.12
5,975,828.265
664,361.391
0.05
116.49
3,391.36
0.50
260.50
3,386.32
3,321.03
-46.80
-110.81
5,975,827.992
664,360.711
0.23
117.20
3,485.96
0.70
249.20
3,480.92
3,415.63
-47.07
-111.76
5,975,827.698
664,359.770
0.24
118.13
3,557.08
0.40
235.90
3,552.03
3,486.74
-47.37
-112.37
5,975,827.391
664,359.165
0.46
118.80
3,677.00
0.40
261.60
3,671.95
3,606.66
-47.66
-113.13
5,975,827.079
664,358.411
0.15
119.59
3,772.65
0.30
241.90
3,767.60
3,702.31
-47.83
-113.68
5,975,826.900
664,357.864
0.16
120.13
3,867.10
0.40
239.60
3,862.05
3,796.76
-48.11
-114.18
5,975,826.606
664,357.368
0.11
120.70
3,962.61
0.20
228.60
3,957.56
3,892.27
-48.39
-114.60
5,975,826.318
664,356.961
0.22
121.20
4,054.62
0.20
233.40
4,049.56
3,984.27
-48.60
-114.85
5,975,826.111
664,356.717
0.02
121.52
4,148.41
0.10
220.60
4,143.35
4,078.06
-48.75
-115.03
5,975,825.947
664,356.535
0.11
121.76
4,242.95
0.30
247.60
4,237.89
4,172.60
-48.91
-115.31
5,975,825.784
664,356.256
0.23
122.09
4,337.27
0.30
240.80
4,332.21
4,266.92
-49.13
-115.76
5,975,825.560
664,355.817
0.04
122.57
4,434.19
0.20
247.50
4,429.13
4,363.84
-49.31
-116.13
5,975,825.363
664,355.444
0.11
122.99
4,528.18
0.30
230.10
4,523.12
4,457.83
-49.54
-116.47
5,975,825.135
664,355.108
0.13
123.39
4,620.12
0.30
232.90
4,615.06
4,549.77
-49.84
-116.85
5,975,824.827
664,354.739
0.02
123.87
5/14/2019 1:44:31PM Page 4 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well E-35
Project:
PBU
ND Reference:
KB @ 65.29usft (E-35)
Site:
E
MD Reference:
KB @ 65.29usft (E-35)
Well:
E-35
North Reference:
True
Wellbore:
E -35C
Survey Calculation
Method:
Minimum Curvature
Design:
E -35C
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
4,716.97
0.30
235.50
4,711.91
4,646.62
-50.13
-117.26
5,975,824.522
664,354.334
0.01
124.38
4,812.12
0.30
231.80
4,807.06
4,741.77
-50.43
-117.66
5,975,824.218
664,353.940
0.02
124.88
4,906.41
0.30
241.00
4,901.35
4,836.06
-50.70
-118.07
5,975,823.937
664,353.536
0.05
125.37
4,997.33
0.30
241.80
4,992.26
4,926.97
-50.93
-118.49
5,975,823.700
664,353.123
0.00
125.84
5,096.86
0.40
251.20
5,091.79
5,026.50
-51.16
-119.05
5,975,823.452
664,352.570
0.12
126.43
5,192.55
0.40
252.40
5,187.48
5,122.19
-51.37
-119.68
5,975,823.230
664,351.940
0.01
127.07
5,288.26
0.40
247.50
5,283.19
5,217.90
-51.60
-120.31
5,975,822.987
664,351.318
0.04
127.71
5,383.32
0.30
260.50
5,378.25
5,312.96
-51.77
-120.86
5,975,822.807
664,350.770
0.13
128.26
5,477.40
0.30
243.80
5,472.32
5,407.03
-51.92
-121.33
5,975,822.648
664,350.309
0.09
128.72
5,570.53
0.20
221.50
5,565.45
5,500.16
-52.15
-121.65
5,975,822.411
664,349.988
0.15
129.12
5,667.99
0.30
256.30
5,662.91
5,597.62
-52.33
-122.01
5,975,822.216
664,349.632
0.18
129.52
5,764.60
0.20
265.80
5,759.52
5,694.23
-52.41
-122.43
5,975,822.134
664,349.220
0.11
129.90
5,856.20
0.30
290.40
5,851.12
5,785.83
-52.33
-122.81
5,975,822.198
664,348.834
0.16
130.17
5,952.64
0.40
269.40
5,947.56
5,882.27
-52.25
-123.39
5,975,822.270
664,348.259
0.17
130.58
6,047.81
0.40
276.30
6,042.73
5,977.44
-52.22
-124.05
5,975,822.288
664,347.596
0.05
131.10
6,141.73
0.40
284.90
6,136.64
6,071.35
-52.10
-124.69
5,975,822.394
664,346.951
0.06
131.55
6,234.19
0.40
282.30
6,229.10
6,163.81
-51.95
-125.32
5,975,822.532
664,346.321
0.02
131.97
6,330.41
0.40
261.20
6,325.32
6,260.03
-51.92
-125.98
5,975,822.538
664,345.660
0.15
132.49
6,425.90
0.50
243.60
6,420.81
6,355.52
-52.16
-126.68
5,975,822.286
664,344.963
0.18
133.20
6,519.77
0.40
244.30
6,514.67
6,449.38
-52.49
-127.34
5,975,821.948
664,344.308
0.11
133.93
6,615.25
0.40
240.10
6,610.15
6,544.86
-52.80
-127.93
5,975,821.624
664,343.726
0.03
134.58
6,710.23
0.40
235.70
6,705.13
6,639.84
-53.15
-128.49
5,975,821.260
664,343.173
0.03
135.25
6,806.26
0.40
247.30
6,801.16
6,735.87
-53.47
-129.08
5,975,820.929
664,342.594
0.08
135.91
6,902.39
0.40
255.40
6,897.28
6,831.99
-53.68
-129.71
5,975,820.701
664,341.964
0.06
136.55
6,993.21
0.40
263.50
6,988.10
6,922.81
-53.80
-130.34
5,975,820.571
664,341.345
0.06
137.12
7,089.21
0.40
270.00
7,084.10
7,018.81
-53.83
-131.00
5,975,820.519
664,340.678
0.05
137.68
7,185.21
0.40
269.60
7,180.10
7,114.81
-53.84
-131.67
5,975,820.502
664,340.008
0.00
138.23
5/14/2019 1:44:31PM Page 5 COMPASS 5000.1 Build 81D
Company: North America -
ALASKA - BP
Project: PBU
Site: E
Well E-35
Well: E-35
Wellbore: E -35C
Design: E -35C
Survey
MD Inc
(usft) (°)
7,281.37
0.40
7,372.37
0.50
7,469.53
0.50
7,562.76
0.50
7,661.96
0.60
7,757.89
0.60
7,852.03
0.70
7,946.19
0.70
8,042.25
0.50
8,136.20
0.40
8,245.16
2.30
8,280.23
5.10
8,318.09
7.90
8,349.18
10.20
8,381.46
12.90
8,412.87
16.20
8,436.79
19.10
8,468.96
22.70
8,500.57
26.90
8,531.22
29.20
Tie in point
Easting DLeg
8,551.00
30.74
KOP - Top of Whipstockk
(usft)
8,572.15
28.06
Interpolated Azimuth
(usft)
8,600.23
24.85
Interpolated Azimuth
7,276.26
BP
Final Survey Report
5/14/2019 1:44:31PM Page 6 COMPASS 5000.1 Build 81D
Local Co-ordinate Reference:
Well E-35
TVD Reference:
KB @ 65.29usft (E-35)
MD Reference:
KB @ 65.29usft (E-35)
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting DLeg
V. Sec
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
264.50
7,276.26
7,210.97
-53.87
-132.34
5,975,820.453
664,339.339
0.04
138.79
261.00
7,367.25
7,301.96
-53.96
-133.05
5,975,820.345
664,338.633
0.11
139.42
256.30
7,464.41
7,399.12
-54.13
-133.88
5,975,820.160
664,337.807
0.04
140.19
252.80
7,557.64
7,492.35
-54.35
-134.67
5,975,819.926
664,337.028
0.03
140.95
246.40
7,656.83
7,591.54
-54.68
-135.56
5,975,819.571
664,336.146
0.12
141.87
247.80
7,752.76
7,687.47
-55.07
-136.48
5,975,819.159
664,335.230
0.02
142.85
240.30
7,846.89
7,781.60
-55.54
-137.44
5,975,818.667
664,334.284
0.14
143.90
246.40
7,941.04
7,875.75
-56.06
-138.46
5,975,818.130
664,333.269
0.08
145.03
250.30
8,037.10
7,971.81
-56.44
-139.40
5,975,817.733
664,332.346
0.21
146.01
249.10
8,131.04
8,065.75
-56.69
-140.09
5,975,817.463
664,331.659
0.11
146.72
221.10
8,239.97
8,174.68
-58.48
-141.88
5,975,815.641
664,329.906
1.80
149.21
220.80
8,274.96
8,209.67
-60.19
-143.36
5,975,813.898
664,328.462
7.98
151.42
224.60
8,312.58
8,247.29
-63.31
-146.29
5,975,810.708
664,325.605
7.48
155.62
228.30
8,343.28
8,277.99
-66.67
-149.85
5,975,807.278
664,322.124
7.63
160.47
226.00
8,374.90
8,309.61
-71.07
-154.57
5,975,802.771
664,317.495
8.48
166.88
228.50
8,405.30
8,340.01
-76.41
-160.38
5,975,797.304
664,311.808
10.69
174.71
226.40
8,428.09
8,362.80
-81.32
-165.71
5,975,792.278
664,306.583
12.41
181.92
227.10
8,458.14
8,392.85
-89.18
-174.07
5,975,784.239
664,298.397
11.22
193.30
227.70
8,486.83
8,421.54
-98.15
-183.83
5,975,775.060
664,288.835
13.31
206.46
228.20
8,513.88
8,448.59
-107.80
-194.54
5,975,765.177
664,278.347
7.54
220.79
228.07
8,531.01
8,465.72
-114.39
-201.90
5,975,758.423
664,271.136
7.79
230.62
225.46
8,549.44
8,484.15
-121.50
-209.46
5,975,751.157
664,263.725
14.04
240.91
221.76
8,574.57
8,509.28
-130.53
-218.10
5,975,741.933
664,255.287
12.85
253.21
5/14/2019 1:44:31PM Page 6 COMPASS 5000.1 Build 81D
by
ND
Company: North America
- ALASKA - BP
Project: PBU
Northing
Site: E
DLeg
Well: E-35
(usft)
Wellbore: E-35C
(usft)
Design: E-35C
(usft)
Survey
(°/100usft)
MD Inc
8,601.68
(usft) V)
-140.00
8,630.00
23.98
Interpolated Azimuth
6.55
8,660.16
25.40
Interpolated Azimuth
-150.29
8,690.08
25.75
First Clean Survey
7.90
8,742.00
25.75
Projection to TD
-161.40
BP
Final Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well E-35
KB @ 65.29usft (E-35)
KB @ 65.29usft (E-35)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Azi
ND
TVDSS
NIS
E/W
Northing
Easting
DLeg
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
217.54
8,601.68
8,536.39
-140.00
-225.96
5,975,732.300
664,247.644
6.55
212.96
8,629.09
8,563.80
-150.29
-233.21
5,975,721.856
664,240.617
7.90
208.12
8,656.08
8,590.79
-161.40
-239.77
5,975,710.598
664,234.308
7.08
208.12
8,702.84
8,637.55
-181.30
-250.40
5,975,690.477
664,224.116
0.00
V. Sec
(usft)
265.12
277.03
288.86
309.14
5114/2019 1:44:31PM Page 7 COMPASS 5000.1 Build 81D
AaeNhbT-NOM
Project: PBU Magnetic NOM. 1690
Site: E MagneW Feld
Well: E36 SUer0574aBan
Wellbore: E -36C ovao :e0 -e
Date.
Actual: E -36C vfaot
MDW BccMuot
WELLBORE DETAILS: E -35C
E -35C
E-35PB1
Tie on MD: 8531.22
AOGCC Offsets within 500ft
Easting (50 usftln)
REFERENCE INFORMATION
Coardinete(NIE) Reference: Well E-35, Two Nath
Vertical (TVD) Reference'. Mean Sae Level
Sactlon(VS) Ref=-= Slot -(0.00N, O.00E)
Measured Depth Reference: KB A6529usft 1E-35
Easting (50 usWin)
North America - ALASKA - BP
PBU
E
E-35
E -35C
E -35C
500292255704
AOGCC Offset Well Report
14 May, 2019
'A • •
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
0.00usft
Reference Well:
E-35
Well Error:
0.00usft
Reference Wellbore
E -35C
Reference Design:
E -35C
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well E-35
Mean Sea Level
KB @ 65.29usft (E-35)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference E -35C
Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria
Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA
Depth Range: Unlimited Scan Method: Tray. Cylinder North
Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic
Survey Program Date 5/14/2019
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
302.15 8,531.22 E-35PB1 Survey 1 MWD -Standard (E -35P MWD MWD - Standard
8,551.00 8,742.00 Survey #1 (E -35C) MWD MWD - Standard
5/14/2019 1:23:59PM Page 2 of 3 COMPASS 5000.1 Build BID
BP
0 bp Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well E-35
Project:
PBU
TVD Reference:
Mean Sea Level
Reference Site:
E
MD Reference:
KB @ 65.29usft (E-35)
Site Error:
0.00usft
North Reference:
True
Reference Well:
E-35
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
E -35C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
E -35C
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
E
E-01 - E-01 - E-01
960.69
950.00
62.90
E-01 - E -01A- E -01A
960.69
950.00
62.90
E-01 - E-01AP131 - E-01APB1
960.69
950.00
62.90
E-01 - E-0113 - E-01 B
960.69
950.00
62.90
E-02 - E-02 - E-02
2,059.35
2,050.00
341.50
E-02 - E -02A - E -02A
2,051.47
2,050.00
341.36
E-02 - E-02APB1 - E-02APB1
2,051.47
2,050.00
341.36
E-02 - E -02B - E -02B
2,051.47
2,050.00
341.36
E-03 - E-03 - E-03
780.60
775.00
130.71
E-03 - E -03A - E -03A
780.60
775.00
130.71
E-04 - E-04 - E-04
683.06
675.00
31.77
E-04 - E -04A - E -04A
682.64
675.00
31.77
E-05 - E-05 - E-05
1,988.79
1,975.00
151.86
E-05 - E -05A- E -05A
1,988.79
1,975.00
151.86
E-05 - E-05AP131 - E-05AP131
1,988.79
1,975.00
151.86
E-05 - E -05B - E -05B
2,010.34
2,000.00
152.21
E-05 - E -05C - E -05C
2,010.34
2,000.00
152.21
E-06 - E-06 - E-06
2,837.75
2,825.00
252.99
E-06 - E -06A - E -06A
2,837.75
2,825.00
252.98
E-101 - E-101 - E-101
751.88
750.00
218.12
E-103 - E-103 - E-103
1,922.32
1,975.00
163.48
E-103 - E-103 - E-103 wp05
1,922.32
1,975.00
163.48
E-103 - E-103PB1 - E -103P81
1,922.32
1,975.00
163.48
E-103 - E-103PB1 - E-103ph wp05
1,948.01
2,000.00
150.58
E-13 - E-13 - E-13
4,071.06
4,150.00
424.03
E-13 - E -13A - E -13A
4,071.06
4,150.00
424.03
E-14 - E-14 - E-14
3,032.58
3,100.00
315.25
E-14 - E -14A - E -14A
3,032.58
3,100.00
315.25
E-15 - E-15 - E-15
3,843.97
3,875.00
230.39
E-15 - E -1 5A - E-1 SA
3,840.26
3,875.00
230.37
E-15 - E-15AP131 - E-15AP131
3,840.26
3,875.00
230.37
E-15 - E-15AP132 - E-15AP132
3,840.26
3,875.00
230.37
E-15 - E-1513- E-158
3,840.26
3,875.00
230.37
E-15 - E-1513PI31 - E -1513P131
3,840.26
3,875.00
230.37
E-15 - E -15C - E -15C
3,844.93
3,875.00
230.39
E-15 - E -15D - E -15D
3,844.93
3,875.00
230.39
E-15 - E -15E - E -15E
3,844.93
3,875.00
230.39
E-16 - E-16 - E-16
3,955.61
3,950.00
432.87
E-16 - E -16A - E -16A
3,955.61
3,950.00
432.87
E-16 - E-16AP131 - E-16AP131
3,955.61
3,950.00
432.87
E-26 - E-26 - E-26
4,402.59
4,400.00
310.40
E-26 - E -26A- E -26A
4,402.59
4,399.98
310.40
E-29 - E-29 - E-29
3,154.20
3,150.00
485.92
E-29 - E -29A - E -29A
3,154.20
3,150.00
485.92
E-29 - E -29A- Plan #2
3,154.56
3,150.00
485.93
E-31 - E-31 - E-31
2,651.41
2,750.00
360.87
E-31 - E -31A- E -31A
2,656.24
2,750.00
361.10
E-33 - E-33 - E-33
5,978.98
5,975.00
426.74
E-33 - E -33A - E -33A
5,978.98
5,975.00
426.74
E-33 - E -33B - E -33B
5,978.98
5,975.00
426.74
E-36 - E-36 - E-36
5,230.07
5,250.00
320.07
E-36 - E -36A - E -36A
5,230.07
5,250.00
320.07
E-36 - E -36B - E -36B
5,230.07
5,250.00
320.07
5114/2019 1:23:59PM Page 3 of 3 COMPASS 5000.1 Build 81D
TREE =
WELLHEAD 7 5M FMC
ACTUATOR =
TVD
KB. ELEV
65.29'
BF. ELEV =
31.51'
KOP =
8349'
Max A le =
4053
Da
105/15/191 ZB/JMD I EDITS TO OPS SHUTDOWN
Da
DMY
OPS SHUTDI 'N
tun MD 20' CONDUCTOR, -1 115
tun TVD = 8800' SS 91.5#, H-40,
D =19.124"
10-3/4" CSG, 45.5#, NT -80 BTC, D = 9.950"3627
Minimum ID = " @ '
4-12' BKR MONOBORE WHIPSTOCK W/RA 8551'
TAGS (0227/19)
7-5/8" CSG, 29.7#, L-80 NSCC, o = 6.875- -8551'
4-1/2" TBG, 12.6#, L-80 NSCC,-8551'
0152 bof. ID = 3.958'
PERFORATION SUMMARY
RFF i
ON _!
ANGLE AT TOP PERF: _'
Note: Refer b Production DB for historical pert data
SG'_E SPF INTERVAL OpnfSqz SHOT SO
4-12' 1 8551 -8742 OH
E-3 5 C SAF 40TES: WELL ANGLE >
MAX --S: _°
HOI I
2205' 4-1/2' HES HXO SSSV NE, ID = 3.813'
Ll
4-12" OPEN HOLE 8742'
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
40480
105/15/191 ZB/JMD I EDITS TO OPS SHUTDOWN
MER
DMY
BK
0
08/25/17
2
6731
6726
0
MER
DMY
BK
0
08/25/17
1
8126
8120
0
MER
DMY
BK
0
08/25/17
7200 H Toc
DIATE REV BY OOMIVENTS
DATE REV BY COMMENTS
06/11/95 N28E ORIGINAL COMPLETION
07/05/01 NORDIC 1 CTD SIDETRACK (E -35A)
12/07/10 NORDIC 1 CTD SIDETRACK (E-3513)
_1 1_ CTD SIDETRACK (E -35C)
08/27/18 JMD BULT PROPOSED
105/15/191 ZB/JMD I EDITS TO OPS SHUTDOWN
MILLOUT WINDOW (E -35C) 8551' - 8561'
PRUDHOE BAY UNIT
WELL: E 35f_
PERMIT No: 2 19 0,11)
AR No: 50-029-22557-04
SEC 6, T11 N, R1 4E, 1187' FNL & 501' FEL
BP Exploration (Alaska)
BA ER % "
UGHES
a GE company
COMPANY BP E
WELL NAME
PRINT DISTRIBUTION LIST
ation Alaska Inc.
E -35C
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider(cDbhge.com
21 9049
6081 1
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com
Ito acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE May 12, 2019
TODAYS DATE May 20, 2019
Revision
STATUS Final Replacement: No Details:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
1 BP North Slope,
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
3 �ExxonMobil,Alaska
Attn: Lynda M. Yaskeli and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
Attn: Natural Resources Technician II
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Rev. Requested by:
FIELD /
FINAL
CD/DVD
FINAL
PRELIM
(las, dlis, PDF, META,
I
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
J# OF COPIES
1 1 1
RECEIVED
MAY 2 1 2019
5 DNR - Division ofOil & Gas ***
Attn! Resource Evaluation
550 West 7th Avenue, Suite 1100
(Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-I
900 E. Benson Blvd
Anchorage, Alaska 99508
Attn: Christopher Ratzlaff
TOTALS FOR THIS PAGE:
0 2 4 2 0
THE STATE
'ALASKA
GOVERNOR MIKE DUNLEAVY
Sean McLaughlin
Engineering Team Lead — CTD
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU E -35C
Permit to Drill Number: 219-049
Sundry Number: 319-248
Dear Mr. McLaughlin:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this t 7 day of May, 2019.
!RBDMS I / MAY 2 0 2019
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS
APPLICATION FOR SUNDRY APPROVAL.,
20 AAC 25.280
MAY 14 2019
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑, ti nnhrRby7f m
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0,
5. Permit to Drill Number: 219-049
3_ Address: P.O. Box 196612 Anchorage, AK
6
99519-6612
Stratigraphic El Service ❑
. API Number: 50-029-22557-04-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU E -35C -
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028304
PRUDHOE BAY, PRUDHOE OIL
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(ft): Effective Depth MD:
Effective Depth TVD:
MPSP (psi):
Plugs (MD):
Junk (MD):
8742
8703 8742
8703
None
None
Casing
Length Size MD TVD
Burst
Collapse
Structural
Conductor
80 20" 35-115 35-115
1490
470
Surface
3592 10-3/4" 35-3627 35-3622
4560
1730
Intermediate
8518 7-5/8" 33-8551 33-8531
6890
4790
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
8551 -8742
8531 -8703
4-1/2" 12.6#
L-80
31 -8551
Packers and SSSV Type: No Packer Installed
Packers and SSSV MD (ft) and TVD (ft): No Packer Installed
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 0 Wellbore Schematic 0
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑
14. Estimated Date for Commencing Operations: May 13, 2019
15. Well Status after proposed work:
Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date: 5/13/2019
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative: Mel Rixse
GINJ ❑ Op Shutdown 0 Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Browning, Zachary H
be deviated from without prior written approval.
Contact Email: Zachary. Browning(5bp.com
Authorized Name: Mclaughlin, Sean M Contact Phone: +1 907 564 5220
Authorized Title: Engineering Team Lead - CTD
Authorized Signature: ^,,y �. •- Date:
g1tY /' C1
1 !
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: -7
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other: 30 A-0 `C -C jp•- "'Il- i � — 14tq f
I Z„ Yko w_ S JVIG e-eo S v vie- m � a
c `, q
Post Initial Injection MIT Req'd? Yes 11 No ❑J 'IBDMS-1f`/MAY 2 0 2019
Spacing Exception Required? Yes ❑ No Subsequent Form Required: b,14 01
`
APPROVED BYTHE5,01
/
Approved by: COMMISSIONER COMMISSION Date: ` L `
v - ORIGINAL
1►(Q.��G Submit Form and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. ttachments in Duplicate
XyOlyp '1_45 S • /,;". "�
Lastufka, Joseph N
Subject: FW: E -35C Operations Summary
Joe,
E -35C Operations Summary:
Nabors CDR2 rigged up on well E -35C on 5/6/19 and the BOPE tested. A dual string window, 4-1/2" x 7-5/8", was milled
from 8551'- 8561' MD. The well kicked off in the Kingak TJC and the 4.25" open hole was drilled down to a depth of
8742' MD (8637.6 TVDss). This total depth is in the Kingak TJA, approximately 43' MD from the projected TSGR. During
drilling, Kingak cuttings/cavings began to increase and after a long wiper trip the rig was unable to work back to bottom.
Multiple cleanout runs were attempted over the next 1-2 days. It was determined that the wellbore had likely crossed a "
fault rubble zone and the Kingak shales were collapsing/caving into the hole. The decision was made to rig down rather
than attempt a second sidetrack. The well was freeze protected and the rig released off the well at 23:59 on 5/13/19. A
Well Operation Shutdown has been granted until the future utility of the wellbore and plan forward is determined.
The wellbore is currently loaded with 9.5 ppg drilling fluid in the open hole (8742' MD — 8551' MD), 10.5 ppg fluid from
the window up (8551' MD to 2500' MD) and 6.8 ppg diesel FP from 2500' MD to surface.
Thanks,
Zach Browning
CTD & RWO Engineer
BP Alaska
0:(907)564-5220
C: (907) 351-7941
Zachary.browning@bp.com
A good solution applied with vigor now is better than a perfect solution applied ten minutes later.
-General Yatton
TREE=
WC.LLHEAD =
ACTUATOR=
KB. ELEV =
5M FMC
65.29'
BF. ELEV =
31.51'
KOP = --
8349'
Max Argle =
Da
PORT
Da
3
OPS SHUTD WN E-35 SAF NOTES: WELL ANGLE>700@
MAX UK -S: _°
2206 4-1/2' HES HXO SSSV NP, D = 3.813'
tun MD = — 20" CONDUCTOR, 115'
Datum TVD = 8800' SS 91.5#, H-40,
D= 19.124"
10-3/4' CSG, 45.5#, NT -80 BTC, D = 9.950' 3627'
Minimum ID = " @ '
4-12" BKR MONOBORE WHIPSTOCK w/RA 8551'
TAGS (0227/19)
7-58" CSG, 29.7#, L-80 NSCC, D = 6.875" —8551'
4-12" TBG, 12.6#, L-80 NSCC, -8551'
.0152 bpf, D = 3.958"
PERFORATION SUMMARY
REF LOG:
ON f !_
ANGLE AT TOP PERF: _°
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL O dS z SHOT SQ
4-12' 8551 -8742 OH
w
CcT�_ ;i� ��L�►1�::73�y
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
4048
0
MER
DMY
BK
0
08/25/17
2
6731
6726
0
MER
DMY
BK
0
08/25/17
1
8126
81201
0
MER
DMY
BK
0
08/25/17
4-12" OPEN HOLE --1 8742'
-7200 —iTOC (0127/19)
DATE REV BY COMMENTS
DATE REV BY COMMENTS
08/11/95 N28E ORIGINAL COMPLETION
07105/01 NORDIC 1 CTD SIDETRACK (E -35A)
12107110 NORDIC 1 CTD SIDETRACK (E-356)
CTD SIDETRACK (E -36C)
0827/18 JMD 1BUILTPROPOSED
05/15/19 ZB/JMD JEDITS TO OPS SHUTDOWN
MILLOUT WINDOW (E -35C) 8551' - 8561'
PRUDHOE BAY UNIT
WELL: E -35C
PERMIT No: 219-049
API No: 50-029-22557-03
SEC 6, T11N, R14E, 1187' FNL & 501' FEL
BP Exploration (Alaska)
THE STATE
JALASKA
GOVERNOR MIKE DUNLEAVY
Sean Mclaughlin
Engineering Team Lead
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E -35C
BP Exploratoin (Alaska), Inc.
Permit to Drill Number: 219-049
Surface Location: 1187' FNL, 501' FEL, SEC. 06, TI IN, R14E, UM
Bottomhole Location: 657' FNL, 801' FEL, SEC. 06, T11N, R14E, UM
Dear Mr. Mclaughlin:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
J ssie L. Chmielowski
Commissioner
DATED this lD day of April, 2019.
APR 01 2019
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMISE
PERMIT TO DRILL
20 AAC 25.005
1 a. Ty pg of yd(prJr
1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑
1 c. Specify if well is proposed for:
Drill j/'y�-,/4.ee� �f�t I
Stratigraphic Test ❑ Development - Oil 0 ' Service - Wnj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hydrates ❑
Redrill 0 • Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 .Single Well ❑
11 Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 29S105380
PBU E -35C
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 11318' TVD: 8997'ss'
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028304 '
Surface: 1187' FNL, 501' FEL, Sec. 06, T11N, R14E, UM
8. DNR Approval Number:
13. Approximate spud date:
2056' FNL, 10' FEL, Sec. 06, T11 N, R14E, UM
89-111
April 15, 2019
Top of Productive Horizon:
9. Acres in Property: 2469
14. Distance to Nearest Property:
Total Depth: 657' FNL, 801' FEL, Sec. 06, T11 N, R14E, UM
8900
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 65.29 • feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 664470 y- 5975877 Zone - ASP 4
GL Elevation above MSL: 30.50 -fee
750
16. Deviated wells: Kickoff Depth: 8575 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 108 degrees
Downhole: 3336 Surface: 2456
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weiqht Grade Coupling Length
MD TVD MD TVD (including stage data)
4-1/4" 3-1/4" 6.6# L-80 TCII 291'
8540' 8456'ss 8831' 8657'ss Uncemented Solid Liner
3-1/4" 2-3/8" 4.7# 0 HYD511 2928'
8390' 8318'ss 11318' ' 8997'ss 100 sx Class'G'
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
1
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
11202 9243
10880
10880
8988
8633, 8636, 8691, 10863
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 20" 260 sx Arctic Set (Aoorox.) 35-115 35-115
Surface 3592 10-3/4" 1175 sx CS III, 375 sx Class 'G' 35-3627 35-3622
Intermediate 9090 7-5/8" 485 sx Class 'G' 33-9123 33-8800
Liner 261 4-1/2" Uncemented Slotted Liner 8862-9123 8736-8800
Liner See Attached
Perforation Depth MD (ft): None Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Browninq. Zachary H
from without prior written approval.
Authorized Name Mclaughlin, Sean M Contact Email Zachary. Browning@bp.com
Authorized Title Engineering Team Lead - CTD & RWO Contact Phone +1 907 564 5220
-,
Authorized Signature ! `-- Date 3
.�, �
Commission Use Only
_
Permit to Drill/� Permit Approv See cover letter for other
API : �.� L7��_. 2 �'%_ � Date:
Number: — _� 0requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: [J/
_/
ptthher �vrww�ps Samples req'd: Yes ❑_/ No M/ Mud log req'd: Yes El No ua
� G
P� w ill j�)� I H2S measures Yes Q No ❑/Directional svy req'd: Yes Iry No 11�
Q 11
Spacing exceptio req'd: Yes ❑ No Inclination -only svy req'd: Yes No
6-rta-�n.c 2a/��C-2SS�Iz( �
a ,p�ro.9••�
Post initial injection MIT req'd: Yes ❑ No ❑
/ APPROVED BY %
Approved by: / COMMISSIONER THE COMMISSION Date: 1Q
l
Form 10-401 Revis; 5/2017
ORIGINAL ^& 0. la- -'f = el s
This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and
Attachments in Duplicate
Casing / Tubing Attachment
E-35B
Casinq Len th Size Cementing Record MD ND
Liner 659 3-3/16" 102 sx Class'G' 8692
9351 8642 -T
8819
Liner 2558 2-3/8" 50 sx Class'G' 86421-111200
8605 1-19246
To: Alaska Oil & Gas Conservation Commission
From: Zach Browning
CTD Engineer
Date: March 28, 2019
Re: E -35C Permit to Drill Request REVISION 1
by
Approval is requested for a permit to drill a CTD sidetrack lateral from well E -35B with the Nabors CDR2
Coiled Tubing Drilling rig on or around April 15`h, 2019.
Proposed plan for E -35C:
Drill a through tubing sidetrack on or around April 1", 2019. The coil sidetrack E -35C will be a 2 -string
sidetrack targeting oil resource under the HOT in Zone 2. It is planned to be drilled with a "slimhole" 2" reel for both
Kingak bighole section and the slimhole production hole. Currently the well has integrity with a good IA test to 2634 psi
on 6-5-18. Pre -rig the IA will be cemented to provide for the dual string kickoff as well as provide the cement packer
above the sidetrack location. A 4-1/2" whipstock will be set on a -line at 8575'. The rig will move in, test BOPE and kill the
well. A 3.80" window + 10' of rathole will be milled. The well kicks off in the Kingak (good cement is expected outside ,
casing, with the primary 7-5/8" TOC = 5045' MD based on volumetrics and 40% washout). The 4.25" hole section (-250')
will be drilled to the TSGR and a 3-1/4" L-80 drilling liner will be run across the Kingak and top set in the Sag. A liner
hanger is planned to hold this liner, but no cement will be pumped (See Request for Variance attached). The sole purpose
of this liner is to facilitate drilling without hole instability. The shoe will be milled, and the well will be drilled down below
the HOT and landed in Zone 2 where the horizontal will be drilled before toeing up above the HOT at TD. The total lateral
length in the production hole section is planned for 2500' MD. The proposed sidetrack will be completed with a 2-3/8" L-
80 solid liner, cemented in place and selectively perforated.
Rig Work (scheduled to begin April 15L, 2019)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2456 psi).
2.
Mill 3.80" Window + 10' of rathole
3.
Drill intermediate section: 4.25" OH, —256' (8 deg DLS in lateral planned).
4.
Run 3-1/4" protection string. Hang off NS liner hanger.
5.
Mill Aluminum shoe.
6.
Drill production section: 3.25" OH, 2486' (20 deg DLS build, 12 deg DLS lateral)
7.
Run 2-3/8" L-80 solid liner to TD.
8.
Pump primary cement job: 20.7bbls, 15.3 ppg Class G, TOC at TOL (8390 MD)*.
9.
Perforate —500' on the rig, 30' planned post rig (1.56" Perfecta guns, 6 spf).
10.
Freeze protect well to a min 2,200' TVDss.
11.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. V: Tree work as necessary
2. S: SBHPS, set LGLVs, set LTP if necessary. RU DPGL
3. F: assist SL in PT LTP if set
4. T: Portable test separator flowback if perf >500' on rig (3-5 days)
5. C: RPM. Perforate above HOT (-30')
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (507 psi over -balance to the reservoir).
Disposal:
• All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >11 must go to GNI.
Hole Size:
• 4.25" for the Kingak hole section
• 3.25" for production hole section
Liner Program:
• 3-1/4", 6.6#, L-80 solid liner (drilling liner): 8540' MD — 8831' MD
• 2-3/8", 4.7#, L-80 solid liner: 8390' MD — 11,318' MD
• A planned 20.7 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 8390' MD).
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (507 psi over -balance).
• A X -over shall be made up to a safetyjoint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 108°, inclination at kick off point is 33°.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property — 8900'
• Distance to nearest well within pool — 750'
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
Perforating:
• Perforating: —530' of perforations (500' on rig, 30' post -rig), 1.56", 60 deg random phasing, 6 spf, perf guns.
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (507 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards:
• E -pad is considered an H2S pad. Recent H2S reading on E-35: 20 ppm on 2/21/17. Max recorded on the pad: 130
ppm on E-102 (9/25/09).
• There are 4 predicted fault crossings along this well plan.
• Lost circulation risk on E -35C is considered Medium.
Reservoir Pressure:
• The reservoir pressure on E -35C is expected to be 3336 psi at 8800' TVDSS (7.29 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2456 psi.
• A min EMW of 8.4 ppg for this well will provide 507 psi over -balance to the reservoir.
Zach Browning CC: Well File
CTD Engineer Joseph Lastufka
564-5220
E -35C Request for Variance:
BP requests a Variance to AOGCC regulation 25 AAC 25.30(d)(5) where it states the following:
"intermediate and production casing must be cemented with sufficient cement to fill the annular space from
the casing shoe to a minimum of 500 feet above all significant hydrocarbon zones and abnormally geo-pressured strata
or, if zonal coverage is not required under (a) of this section, from the casing shoe to a minimum of 500 feet above the
casing shoe; if indications of improper cementing exist, such as lost returns, or if the formation integrity test shows an
inadequate cement job, remedial action must be taken";
Variance is requested for the E -35C 3-1/4" liner for the following reasons:
1. The 3-1/4" liner is intended as a drilling liner to allow the lateral to be drilled past the troublesome Kingak
shale, and is not considered by BP as an intermediate liner. The difference is that this liner is not intended to
provide zonal isolation, nor is it needed for well control to provide an expanded kick tolerance window.
2. Zonal isolation of the Sag-Ivishak is provided by the primary cement job performed for the 7-5/8" production
casing string. This cement job, performed on 03 -June -1995, was completed successfully with good returns
reported throughout the job and a solid plug bump. 228 bbls, 485 sx, class G cement was pumped. Assuming
40% washout the calculated TOC is at 5045' MD in the 9-7/8" x 7-5/8" annulus. This gives 3530' MD of cement
above KOP, and 741' MD is across the Kingak (721' TVD across the Kingak).
3. The 2-3/8" production liner will be brought 150' above the 3-1/4" drilling liner. This liner will be cemented to
the TOL, and it can be expected that some of the cement will U-tube behind the 3-1/4" liner providing some
isolation. The total annulus volume behind the 3-1/4" liner is only 1.9 bbls. This amount of excess volume is
planned for the 2-3/8" liner job in addition to our normal 20% OH volume.
4. It is documented that the Kingak is highly unstable when underbalanced and it is expected to collapse around
pipe in a short amount of time after reducing the bottom hole pressure to drill Ivishak. In many other wells in
Prudhoe the Kingak has been relied on to provide isolation when it has collapsed and a cement job was
impossible due to no circulation or injection capability.
5. The nature of the Kingak shale, its likelihood to collapse, its potential for permeability within the Kingak
Interval, and the Kingak and Sag River pore pressure relationship in this area are discussed in detail below.
Nature of the Kingak Shale
The Kingak formation is a Jurassic aged Shale that exists over most of the Greater Prudhoe Bay Unit. The Kingak Interval
varies in thickness from nearly 1400' in the western part of the field to 0' in the east, where it is completely truncated by
the Lower Cretaceous Unconformity (LCU). The interval is subdivided into 8 sub -units designated the JA (oldest) to the JH
(youngest). About 950' TVD of Kingak is preserved in the E-35 well. The LCU erodes into the Kingak JG subzone in the E-
35 area. From a geomechanical perspective, the Kingak is considered to be a time sensitive shale. Significant wellbore
stability issues have been encountered while drilling, casing and cementing the interval. Significant collapse of the shaly
portions of the Kingak into open annuli has been observed while drilling and collapse/expansion is expected to occur
behind uncemented casings.
Potential for permeability within the Kingak Interval
Throughout the Prudhoe Bay Area, the Kingak JF and the JD subzones are tightly cemented argillaceous siltstones.
Additionally, a 5-10' thick silty interval is also commonly associated with top of the JB sub -unit. The remaining Kingak
subzones are finer grained, fissile to semi fissile shales. The Kingak siltstones exhibit significant amounts of pyrite and
either glauconite or calcite cement. Slow ROP is commonly associated with the silty units. None of the silty intervals have
exhibited evidence of flow potential while being drilled. Historic drilling fluid losses in the Kingak are tied to faulting.
Several instances of gas cut mud have been encountered when drilling the Kingak Interval but there are no known
instances of a fluid influx.
Kingak and Sag River Pore Pressure Relationships
The pore pressure for the Kingak shale in the E-35 area ranges between 9.6 ppg —10.5 ppg. Kingak pore pressures are
indirectly estimated shale pressures derived from mud weights required to maintain wellbore stability. Isolated lenses of
permeable rock within the Kingak would inherit the shale pressure that they are contained in.
Based on near offset SBHP measurements, the Sag River and Ivishak most likely pore pressures in the E-35 area are
expected to be 6.80 ppg and 7.25 ppg respectively. If a Kingak interval with sufficient permeability to flow were to be
encountered, then the current expected cross flow path would be from the Kingak to the Sag River. Given the very large
disparity between the volumes of the two systems, the cross flow would equilibrate to the lower active reservoir pressure
very quickly.
E-35 Area Kingak Log section with 2 nearest offset wells.
8400
8500
8600
8700
F— 8800
8900
9000
9100
C-JJI, Filial Z-+MUYz VlV rrr\J
2 4 6 8 10 12 14 16 18 20
pp9
E -35C Pre -Drill PPFG Prediction
Min Pore Pressure
— Most Likely Pore Pressure
— Max Pore Pressure
— — Min Sand Frac: PR= 0.31
— — ML Sand Frac: PR= 0.33
Brumfield Shale Frac
overburden
— --�-,
-
I :I
1 :1
I :1
I :1
t.
I :1
:1
1
- --- -
-
1
I
1
I
i
1
1
TCUU
acct
HOT..:. ... ...
..
......... i
.�....:. .....:�......7.
....
POW .:.......:.....:.......:.......i
I .......:I........
....
2 4 6 8 10 12 14 16 18 20
pp9
E -35C Pre -Drill PPFG Prediction
Min Pore Pressure
— Most Likely Pore Pressure
— Max Pore Pressure
— — Min Sand Frac: PR= 0.31
— — ML Sand Frac: PR= 0.33
Brumfield Shale Frac
overburden
Well Slimhole 4 Ram BOP Schematic (example) Date
"Note: Updated schematic will be submitted once rig contracts are final.
Quick Test Sub to Otis 1.1 ft t
- — — -----
Top of7"Otis 0.0 ft ------
_._
CDR2 Rig's Dnp Pan
Distances from top of riser
Excluding quick -test sub
4 7-1/16" 6k Flange X 7" Otis Box
Top of Annular 6.0 ft AL
Top of Annular Element 6.7 ft
Bottom Annular 8.0 ft
CL Blind/Shears 9.3 ft
CL 2" Pipe/Slips 10.1 ft
B1
Kill Line
CL 2-318" x 3-1/2" VBRs 10
CL 2" Pipe/Slips 13.4 ft
CL of Top Swab 1 16.0 ft
CL of Flow Cross 1 17.4 ft
CL of Master 18.8 ft
LDS
LDS II
Ground Level
An
B2 B3 rib, B4
Swab
T1 je T2
Master
IA
OA
Choke Line
Test Pump Hose
TTS = 4-1/16" CNV
WELLHEAD =
5M FMC
ACTUATOR =
BAKER C
KB. ELEV =
65.29'
BF. ELEV -
34.79
KOP _
8349'
Max Angle =
97°
Datum MD =
9442
Datum TVD =
8800' SS
20' CDPDUCTOR 115'
91.5#, H-40,
D = 19.124'
10-3/4" CSG, 45.5#, NT -80 BTC. D= 9.950" J 3627
Minimum ID =1.780" @ 8648 '
2.70" BTT DEPLOY SLEEVE
FISH BKR 4" G BAIT SUB 3.70" X .62, 8633' CTM
OVERSHOT 3-63" X 2.20', OAL = 2.82'(5/26/18)
TOP OF 2-3M8 LNR 1-4 RBAW
TOP OF 2-7/8" LNR H 8691'
L4-irz_ i tS>, i Z.b#. L-80 NSCC, .0152 bpf, D = 3.958"
TOC CTD LNR (SCMT 10/09)
TOP OF 4-1/2' LNR
17-58' CSG, 29.7#, L-80 NSCC,
ID = 6.875' (OLD SDTRK WINDOW)
4-1/2" LNR, 12.6#, L-80 NSCT, D = 3.958'
2-7/8" WHPSTOCK (11/26/100
3-3/16" CSG, 6.2#, L-80 TC I..0076 bpi, D = 2-80'
8760' J
8760'
' Y NOTES: WELL ANGLE > 700 @ 8925'***
14-1/2" HES 1-000 SSSV tom, D= 3.813' 1
CCAS I IFT MANrIPP C
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
4048
0
MER
DMY
BK
0
08/25!17
2
6731
6726
0
MER
DMY
BK
0
08/25/17
1
6126
8120
0
MER
DMY
BK
0
08/-5/17
8636' CTM
—{ FISH: TOOLS LEFT IN HOLE - SEE R®LBVE
FOLDER FOR TOOL DRAWINGS (04/10118)
8648`
2.70" BTT DEPLOY SLV, D = 1.780"
86$9'
BKR LOC SMSEAL ASSY, D =2.39" 1
��'
♦�
=—[;
FISH:
2 FULL 45KB PKR SLIPS, 2 HALF PIECES
45KB PKR SLIPS - UNKNOWN DEPTH (11/17117)
8691'_
3-1/2' BKR DEPLOY SUB, D = 3-00' —
8691'
4-1/2' HES X NIP, D = 3.813" '-+^
8702'_
3-1/2^ X 3-3/16' XO, D= 2.786'
8703'7-5/8"
X 4-1/2" BKR SABL-3 PKR
W/ K A NCH, D = 3.87"
8727'
4-1 /2" HES X NIP, D = 3.813"
8738` j--�4-1/2" HES XN NIP, D = 3.725"
8760' -j4-1/2" WLEG, D= 3.95
8747' ELMD TT LOGGED 4/18/97
—9362
PERFORATION SLAuM ITY
RE= LOG: SLB MUL.TDCFRESS (FLOC)
GR/ RES/ NEU DEV ON 12/03/10
ANGLE AT TOP PERF: 24°@ 11080'
Wte: Refer to Production DB for historical perf data
SIZESPF HTERVAL OprdSgz SHOT SQ
2' 6 8981-9386 C 12/13/08
1-11/16" 6 11080-11110 S 12/06/10 09/11/17
3.3116" MLLOUT WINDOW (E -35B) 9351' - 9357'
^10880' TOC (09/11/17)
PBTD H 11163'
FISH: BKR FISHING BHA 10863'
14.23' LONG (09/12/17)
2-3/8" LNR 4.7#, L-80 STL, .0039 bpf, D = 1.992^ 11200'
j♦4
♦�
j♦�•" • " t
��
♦
��'
♦�
jt
—9362
PERFORATION SLAuM ITY
RE= LOG: SLB MUL.TDCFRESS (FLOC)
GR/ RES/ NEU DEV ON 12/03/10
ANGLE AT TOP PERF: 24°@ 11080'
Wte: Refer to Production DB for historical perf data
SIZESPF HTERVAL OprdSgz SHOT SQ
2' 6 8981-9386 C 12/13/08
1-11/16" 6 11080-11110 S 12/06/10 09/11/17
3.3116" MLLOUT WINDOW (E -35B) 9351' - 9357'
^10880' TOC (09/11/17)
PBTD H 11163'
FISH: BKR FISHING BHA 10863'
14.23' LONG (09/12/17)
2-3/8" LNR 4.7#, L-80 STL, .0039 bpf, D = 1.992^ 11200'
4-1/16" CIW
WELLHEAD =
5M FMC
ACTUATOR =
6AKER C
KB- ELEV =
65.29'
BF. ELEV =
34.79
KOF _
9;
Max Angie =
.9TH 9194'
battxrl MD
9442'
batten TV D =
880tP SS
L..E
20" oDPOUCTOR 115'
91.54, 11-40,
D = 19.124"
10-3/4" CSG, 45.5#, NT -80 BTC, D = 9.950"
F,5 :
14 112" Bkr Whipstock
a 112" Cerrcnt Retainer
4 1i?' GIHP
FISH: BKR 4" G BATT SUB 3.70'X.621,
OVERSHOT 3.63'X 2.20', OAL =2.82- (5/26118)
TOP OF 2-3/8" LNR
TOP OF 2-7/8' LNR
Minimum ID =1.780" @ 8648 '
2.70" BTT DEPLOY SLEEVE
L 4-112" TBG, 12.6#, L-80 NSCC, .0152 bpf, D = 3.958"
TOC CTO LNR (SCMT 10/09)
TOP OF 4-1/2' LNR I
175/8" CSG, 29.7#, L-80 NSCC,
ID = 6-875" (OLD SDTRK WINDOW)
4-1/2' LIR, 12.6#, L-80 NSCT, D = 3-958-
12-7/8* VVHPSTOCK (11/26/100
3-3116" CSG, 6.21/, L-80 TC1, .0076 bpf, D = 2.80"
I 7000• �
8610'
8825'
8633' CTM
C8648°
8$91'
j 8760'
8760'
C
a _. -sY NOTES: WELL ANGLE> 700 @ 8926'***
2206* 1--14-1 /2" HES HXO SSSV N K)D = 3.813"
r -A S I I! T UA Irv= c
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
4048
0
MER
DMY
BK
0
08/25/17
2
6731
6726
0
MER
OMY
BK
0
08/25/17
1
8126
8120
0
M�
DMY
BK
0
08/25/17
8636' CTM FISH TOOLS LEFT N HOLE - SEE REDLW
8648'
8889'
F-8747'--]
FOLDER FOR TOOL DRAWINGS (04/10/18)
2.70^ BTT DEPLOY SLV, ID = 1.780"
BKR LOC SUB/SEAL ASSY, D = 2.39"
,�
FISH
2 FtJLL 45KB PKR SLIPS, 2 HALF PES
♦�
OF 45KB PKR SLIPS - UNKNOWN DEPTH (11/17/17)
8$91'
3.1/2" BKR DEPLOY SUB, D = 3.00-
11
4-1/2' HES X NP, D = 3.813"
8702*
3 1 /2" X 3-3/16" XO, ID = 2.786"
8703�7-518-X4-U2'BK1RSAl3L-3PKRj
.87"
8727' H4-1/2'
HES X NP, K)=3 -813-
=3.813"
4-1/2" HES XN NP, D= 3.725'
8747' —�ELMD TT LOGGED 4/18/9
PERFORATION SUMMRY
RIF LOG: SLB MULTEXPRESS (FLE)O
GR/ RES/ NRY DEM ON 12/03/10
ANGLE AT TOP PERF: 24-@1108(Y
Note: Refer to Production DB for historical pert data
SIZE I SPFJ KrERVA1 10prVSqz I SHOT I
3-3/16' MLLOUT WINDOW (E -35B) 9351' - 9357'
10880' O/117
tt,I PBTD 111$3'
2' 6 8981-9386 C 12/13/08 FISH: BKR FISHING BHA _ 10863'
1-11/16" 6 11080-11110 S 12/06/10 09/11/17 114-23- LONG (09/12/17)
2-3/8" LW 4.7#, L-80 STL, .0039 bpf, D = 1.992" 11200•
♦�
��1:7-5�/8"�X4-1;r2";TWH13BP
r
PERFORATION SUMMRY
RIF LOG: SLB MULTEXPRESS (FLE)O
GR/ RES/ NRY DEM ON 12/03/10
ANGLE AT TOP PERF: 24-@1108(Y
Note: Refer to Production DB for historical pert data
SIZE I SPFJ KrERVA1 10prVSqz I SHOT I
3-3/16' MLLOUT WINDOW (E -35B) 9351' - 9357'
10880' O/117
tt,I PBTD 111$3'
2' 6 8981-9386 C 12/13/08 FISH: BKR FISHING BHA _ 10863'
1-11/16" 6 11080-11110 S 12/06/10 09/11/17 114-23- LONG (09/12/17)
2-3/8" LW 4.7#, L-80 STL, .0039 bpf, D = 1.992" 11200•
EE=
WELLHEAD 5MFMC
KB ELEV = 65.29
BF. ELEV = 34.79
KOP = 8349
Mix Angle = "
L73tum MD =
20" CONDUCTOR 115'
91.5#, 1-1-40,
08fum ND = 8800 SS
D =19.124"
TYPE
10-3/4" CSG, 45.5#, NT -80 BTC, D = 9.950' 1--F-3627'
Minimum ID = ' I
@
TOP OF 2-318- LNR 8390"
OF 3-1/4' LNR 1-+ 85,40'
WHIPSTOCK (__.�/.._._) 8575-
7-5/8' CSG, 29.7#, L-80 NSCC, D = 6.875' ^8575'
4-112' TBG, 12.6#, L-80 NSCC, ^-8575'
0152 bpf, D = 3.958"
13-114" LW #, L-80 TCt .— bpf, ID =� 8831'
PERFORATION SUMMARY
FI3= LOG:
ON
ANGLEATTOPPE - T
Note: Refer to Production DB for historical pert data
SIZE JSPFJ INTERVAL 10prVSqzl SQ
r�3 rr3
12 -34" -LW #, L-80 STL, ._ bpf, ID
I .,
E -3 5 + L Y NOTES: vv' Ft , i, rr L; s t: i1" fes
MAX Dt. S -
\OJ
2205' - �4-1 /2' FSS HDCO SSSV Nom, D = 3.813"
GAS I FT MA IunRra c
ST
MD
ND
DEV
TYPE
VLV
LATCH
PORT
DATE
3
4053
4048
0
MER
DMY
BK
0
08/25/17
2
6731
6726
0
MER
DMY
BK
0
08/25/17
1
8126
8120
0
MER
DMY
BK
0
08/25!17
7000' I- TOC j r_ }
8390' 3.70" 2270' DER OY SLV, ID = �'
8540' -13.70" DEPLOY SLV , D = 3.00'
8550' NS 3-114' LNBR HANGM
MLLOUT WINDOW (E -35C) 8575' - 8585'
DATE FEV BY COMMENTS
DATE REV BY CONIVUM
06111195 N28E ORIGINAL CONRPLETION
--"-
07/05101 NORDIC 1 CTD SIDETRACK (E -35A)
12107/10 NORDIC 1 CTD SIDETRACK (&35B)
—I—/— CTDSIDETRACK(E-35C)
08/27/18 JMD BMTRWOSED
2-38" PUP JT w /W\ TAG
PRUDHOE BAY LMT
W13L E35C
PERMT No:
AR W: 50-029-22557-03
SEC 6, T1 R R14E� 1187' F NL & 501' FEL.
BP Explormfion (Alaska)
North America - ALASKA - BP
PBU
E
E-35
E -35C
Plan: E -35C WP04
BP Coil Tubing Report
05 February, 2019
Company:
North America - ALASKA - SP
Project:
PBU
Site:
E
Well:
E-35
Wellbore:
E -35C
Design:
E -35C WP04
BP
BP Coil Tubing Report
Local Co-ordinate Reference:
Well E-35
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 65 29usft (E-35)
North Reference:
True s
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Aiackn Penn - Amro,
Project PBU, PBU, PRUDHOE V
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27 ' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 (26734'1586, Using geodetic scale factor
Site E, TR -11-14
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well E-35, E-35
Well Position +N/ -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore E -35C
Magnetics Model Name Sample Date
BGGM2018 5/1/2019
Design E -35C WP04
Audit Notes:
Version: Phase:
Vertical Section: Depth From (TVD)
(usft)
-31.51
Northing:
5,973,160.880 usft
Latitude:
70° 19' 59.134 N
Easting:
662,538.970 usft
Longitude:
148° 40'53,054 W
Slot Radius:
0.000 in
Grid Convergence:
1.24 °
Northing:
5,975,677.210 usft
Latitude:
70° 20'25430 N
Easting:
664,470.460 usft
Longitude:
148° 39'54.924 W
Wellhead Elevation:
31.51 usft
Ground Level:
30.50 usft
Declination
Dip Angle Field
Strength
(nT)
16.90
80.95
57,430
Tie On Depth: 8,563.28
N/ -S +E/ -W
Direction
isft) (usft)
(°)
L00 0.00
330.28
1
2/5/2019 11:17 38AM Page 2
COMPASS 5000.1 Build 810
Lip
BP
BP Coil Tubing Report
Company: North America - ALASKA - BP
To
Project: PBU
Local Co-ordinate Reference:
Well E-35
Site: E
TVD Reference:
Mean Sea Level
Well: E-35
MD Reference:
KB @ 65.29usft (E-35)
Wellbore: E -35C
North Reference:
True
Design: E -35C WP04
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Tool Program Date 2/5/2019
-
- -
From
To
(usft)
i
(usft) Survey (Wellbore)
Tool Name
Description
302.15
8,563.28
8,563.28 E-35PB1
11,317.65 E -35C
Survey 1 MWD -Standard (E -35P
WP04 (E -35C)
MWD
MWD
MWD - Standard
MWD - Standard
Planned Survey
MD
(usft)
8,563.28
8,575.00 s
8,595.00
8,600.00
8,635.00
Inc
(°)
31.70
32.89
31.09
30.69
27.89
Azi
(�)
228.00
228.08
228.08
228.08
228.08
TVDSS
(usft)
8,476.22
8,486.13
8,503.09
8,507.38
8,537.90
NIS
(usft)
-118.65
-122.84
-129.91
-131.63
-143.07
EIW
(usft)
-206.63
-211.29
-219.17
-221.08
-233.82
Northing
(usft)
5,975,754.064
5,975,749.777
5,975,742.528
5,975,740.771
5,975,729.057
Easting
(usft)
664,266.497
664,261.934
664,254.209
664,252.337
664,239.852
DLe 9
(°HOOusft)
0.00
10.16
9.00
8.00
8.00
V. Sec
(usft)
-0.61
-1,93
-4.17
-4.72
-8.33
TFace
0.00
2.09
-180.001
-180.00
180.00 ;
8,700.00
8,800.00
8,830.92
8,900.00
9,000.00
9,023.85
9,100.00
9,200.00
9,300.00
9,400.00
27.88
29.56
30.46
42.63
61.30
6584
60.26
56.19
56.65
61.52
216.95
200.62
196.01
207.14
216.33
217.98
202.07
178.98
154.93
132.28
8,595.40
8,683.22
8,710.90
8,765.46
8,826.88
8,837.49
8,872.17
8,925.35
8,981.23
9,033.09
-165.39
-207.23
-221.90
-259.73
-325.87
-342.88
-401.25
-483.85
-564.04
-632.12
-254.28
-277.06
-281.91
-297.49
-339.35
-352.24
-386.25
-401.98
-383.36
-332.63
5,975,706.296
5,975,663.965
5,975,649.190
5,975,611.031
5,975,543.996
5,975,526.709
5,975,467.617
5,975,384.689
5,975,304.940
5,975,237.985
664,219.886
664,198.028
664,193.502
664,178.760
664,138.367
664,125.845
664,093.135
664,079.219
664,099.594
664,151.803
8.00
8.00
8.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
-17.57
-42.62
-52.96
-78.09
-114.78
-123.15
-156.99
-220.93
-299.80
-384.08
-95.001
-85.15
-70.82
33.19
24.191
18.44 -
114.97
-107.71
-95.421
-81.98
9,500.00
9,600.00
9,700.00
9,725.90
9,800.00
9,900.00
69.74
7997
91 10
9400
93.42
92.29
112.22
94.39
77.69
73.40
58.56
38.57
9,074.67
9,100.95
9,108.78
9,107.63
9,102.81
9,097.78
-679.91
-701.63
-694.67
-688.22
-658.20
592.44
-255.90
-162.44
-63.50
-38.45
28.90
103.39
5,975,191.896
5,975,172.230
5,975,181.358
5,975,188.360
5,975,219.846
5,975,287.226
664,229.551
664,323.465
664,422.222
664,447.118
664,513.790
664,586.812
20.00
20.00
20.00
20.00
20.00
2000
-463.61
526.82
-571.82
-578.63
-585.95
-565.76
-70.221
61.85
-57.14
-55.82
-91.75
-92.72
2/5/2019 11:17:38AM Page 3
COMPASS 5000.1 Build 81D
Company: North America - ALASKA
- BP
Project: PBU
Local Co-ordinate Reference:
Well E-35
Site: E
Well: E-35
TVD Reference:
Wellbore: E -35C
Mean Sea Level
Design: E -35C WP04
Planned Survey
MD Reference:
MD Inc
Azi
(usft) (°f
(°)
10,000.00
90.88
18.61
10,097.90
89.39
359.08
10,100.00
89.39
359.34
10,200.00
89.41
11.34
10,282.90
89.44
21.29
10,300.00
89.44
19.23
10,400.00
89.46
7,23
10,500.00
89.50
355.23
10,562.90
89.53
347.68
10,600.00
89.61
343.23
10,700.00
89.83
331.23
10,800.00
90.07
319.24
10,827.90
90.13
315.89
10,900.00
98.26
312.91
10,986.74
108.00
309.14
11,000.00
108.00
307.47
11,096.74
108.00
295.26
11,100.00
107.70
295.00
11,182.65
100.00
288.55
11,200.00
100.00
290.67
11,300.00
100.00
302.86
11,317.65 y
100.00
305.01
2/5/2019 11:17:38AM
BP
BP Coil Tubing Report
Page 4
COMPASS 5000.1 Build 810
Local Co-ordinate Reference:
Well E-35
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 65.29usft (E-35)
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD
- ANCP1
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
9,095.00
-505.10
150.97
5,975,375.575
664,632.465
20.00
-513.51
-93.72
9,094.76
-408.84
165.95
5,975,472.138
664,645.330
20.00
-437.33
-94.28
9,094.79
-406.74
165.92
5,975,474.237
664,645.254
12.00
-435.49
90.00
9,095.84
-307.36
175.21
5,975,573.790
664,652.355
12.00
-353.79
90.00
9,096.67
-227.90
198.46
5,975,653.733
664,673.856
12.00
-296.31
89.87
9,096.84
-211.86
204.38
5,975,669.900
664,679.424
12.00
-285.31
-90.00
9,097.81
-114.70
227.23
5,975,767.533
664,700.133
12.00
-212.26
-89.98
9,098.73
-14.91
229.37
5,975,867.339
664,700.089
12.00
-126.66
-89.86
9,099.26
47.25
220.04
5,975,929.269
664,689.393
12.00
-68.05
-89.751
9,099.54
83.15
210.72
5,975,964.956
664,679.295
12.00
-32.25
-89.00
9,100.02
175.19
172.10
5,976,056.120
664,638.661
12.00
66.83
9,100.11
257.19
115.18
5,976,136.846
664,579.964
12.00
166.26
-88.97
-88.91 I
9,100.06
277.78
96.36
5,976,157.013
664,560.695
12.00
193.47
-88.90
9,094.80
328.05
45.04
5,976,206.142
664,508.287
12.00
262.57
-20.001
9,075.11
383.46
-18.57
5,976,260.143
664,443.489
12.00
342.22
-2022 _.
9,071.01
391.28
-28.46
5,976,267.740
664,433.426
12.00
353.92
-89.741 _
9,041.12
439.08
-106.87
5,976,313.806
664,353.991
12.00
434.30
-88.11
9,040.12
440.39
-109.68
5,976,315.061
664,351.154
12.00
436.84
-140.00
9,020.33
470.06
-184.13
5,976,343.080
664,276.078
12.00
499.51
-140.08
9,017.32
475.79
-200.22
5,976,348.460
664,259.864
12.00
512.47
89,82
8,999.95
520.05
-287.99
5,976,390.786
664,171.156
12.00
594.42
88.94
8,996.89
529.76
-302.41
5,976,400.170
664,156.527
12.00
609.99
89,81
Page 4
COMPASS 5000.1 Build 810
b
Well E-35
ND Reference:
Mean Sea Level
MD Reference:
BP
p
True
Survey Calculation Method:
Minimum Curvature
Database:
BP Coil Tubing Report
Company:
North America
- ALASKA - BP
Project:
Pau
Site:
E
Well:
E-35
Wellbore:
E -35C
Design:
E -35C WP04
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
8,563.28
8,476.22
-118.65
-206.63
E-35PB1 Actual Survey - TIP
8,575.00
8,486.13
-122.84
-211.29
KOP
8,595.00
8,503.09
-129.91
-219.17
End 9deg/100ft
8,635.00
8,537.90
-143.07
-233.82
4
8,830.92
8,710.00
-221.90
-281.91
End 8deg/100ft
9,023.85
8,837.49
-342.88
-352.24
6
9,725.90
9,107.63
-688.22
-38.45
7
10,097.90
9,094.76
-408.84
165.95
End 20deg/100ft
10,282.90
9,096.67
-227.90
198.46
9
10,562.90
9,099.26
47.25
220.04
10
10,827.90
9,100.06
277.78
96.36
11
10,986.74
9,075.11
383.46
-18.57
12
11,096.74
9,041.12
439.08
-106.87
13
11,182.65
9,020.33
470.06
-184.13
14
11,317.65
8,996.89
529.76
-302.41
TD at 11317.65
21512019 11:1738AM Page 5
Local Co-ordinate Reference:
Well E-35
ND Reference:
Mean Sea Level
MD Reference:
KB @ 65.29usft (E-35)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
COMPASS 5000.1 Build 81D
North America - ALASKA - BP
PBU
E-35
E -35C
E -35C WP04
Anticollision Summary Report
05 February, 2019
by
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
0 00usft
Reference Well:
E-35
Well Error:
0.00usft
Reference Wellbore
E -35C
Reference Design:
E -35C WP04
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well E-35
Mean Sea Level
KB @ 65.29usft (E-35)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
teference E -35C WP04
liter type: NO GLOBAL FILTER. Using user defined selection & filtering criteria WARNING: There is hidden tight data in this project
iterpolation Method: MD Interval 25.00usft Error Model: ISCWSA
iepth Range: 8,563.28 to 11,317.65usft Scan Method: Tray. Cylinder North
results Limited by: Maximum center -center distance of 1,328.39usft Error Surface: Elliptical Conic
Survey Tool Program
From
(usft)
302.15
8,563.28
Date 2/5/2019
To
(usft) Survey (Wellbore) Tool Name Description
8,563.28 E-35PB1 Survey 1 MWD -Standard (E -35P MWD MWD - Standard
11,317.65 E -35C WP04 (E -35C) MWD MWD - Standard
21512019 11 18 08AM Page 2 of 5 COMPASS 5000. 1 Build 81D
by
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
O.Oousft
Reference Well:
E-35
Well Error:
0 Oousft
Reference Wellbore
E -35C
Reference Design:
E -35C WP04
Summary
BP
Anticollision Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well E-35
Mean Sea Level
KB @ 65 29usft (E-35)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
2/5/2019 11:18:08AM Page 3 of 5 COMPASS 5000. 1 Build S1D
Reference
Offset
Centre to
No -Go
Allowable
Site Name
Measured
Measured
Centre
Distance
Deviation
Warning
Offset Well - Wellbore - Design
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
(usft)
E
E-01 - E-01 - E-01
E-01 - E-01 A- E-01 A
Out of range
E-01 - E-01APB1 - E-01APB1
Out of range
E-01 - E-01 B- E-01 B
Out of range
E-02 - E-02 - E-02
Out of range
E-02 - E -02A - E -02A
Out of range
E-02 - E-02APB1 - E-02APB1
Out of range
E-02 - E-026 - E-028
Out of range
E-03 - E-03 - E-03
Out of range
E-03 - E -03A - E -03A
Out of range
E-05 - E-05 - E-05
Out of range
E-05 - E -05A - E -05A
Out of range
E-05 - E-05APB1 - E-05AP61
Out of range
E-05 - E-058 - E-058
Out of rangeOut
E-05 - E -05C - E -05C
9,988.28
12,647.00
1,175.32
137.16
1,04675
of range
Pass Major
E-06 - E-06 - E-06
- Risk
E-06 - E -06A - E -06A
Out of range
E-101 - E-101 - E-101
Out of range
E-12 - E-1 2A - E-1 2A
11,147.20
9,425.00
966.47
115.44
86036
Out of range
Pass Major
E-13 - E-13 - E-13
- Risk
E-13 - E -13A - E -13A
Out of range
E-14 - E-14 - E-14
Out of range
E-14 - E-1 4A - E-1 4A
Out of range
E-15 - E-15 - E-15
Out of range
E-15 - E-1 5A - E-1 5A
Out of range
E-15 - E-15AP81 - E-15AP81
Out of range
E-15 - E-15AP132 - E-15AP62
Out of range
E-15 - E-156 - E-156
Out of range
E-15 - E -1 58P81 - E-15BPB1
Out of range
E-15 - E -15C - E -15C
Out of range
E-15 - E -15D - E -15D
Out of range
E-15 - E -15E - E -15E
Out of range
E-16 - E-16 - E-16
10,045.39
9,175.00
71.11
11.65
68.96
Out of range
Pass - Minor 1/10
E-16 - E -16A - E -16A
E-16 - E-16APB1 - E-16AP131
9,770.57
9,225.00
59.64
4.14
55.91
Pass - Minor 1/10
E-26 - E-26 - E-26
9,993.59
9,057.00
168.68
9.91
168.68
Pass - NOERRORS
E-26 - E -26A - E -26A
10,038.28
8,875.00
1,242.04
85.14
1,161.54
Pass - Major Risk
E-28 - E-28 - E-28
9,863.28
9,825.00
476.31
98.14
397.31
Pass - Major Risk
E-28 - E -28A - E -28A
Out of range
E-28 - E-28APB1 - E-28AP81
Out of range
E-29 - E-29 - E-29
Out of range
E-29 - E -29A - E -29A
Out of range
E-29 - E -29A -Plan #2
Out of range
E-31 - E-31 - E-31
Out of range
E-31 - E -31A- E -31A
Out of range
E-33 - E-33 - E-33
Out of range
E-33 - E -33A - E -33A
Out of range
E-33 - E-336 - E -33B
Out of range
E-35 - E-35 - E-35
8,881.11
8,900.00
129.60
0.24
129.60
Out of range
Pass - NOERRORS
E-35 - E -35A - E -35A
E-35 - E -35B - E -35B
8,881.11
8,900.00
129.60
0.27
129.60
Pass - NOERRORS
E-35 - E-35PB1 - E-35PB1
8,881.11
8,900.00
12960
0.33
12960
Pass - NOERRORS
E-36 - E-368 - E -36B
8,881.11
8,900.00
129.60
0.24
129.60
Pass - NOERRORS
9,263.28
11,808.00
767.27
146.11
649.58
Pass - Major Risk
2/5/2019 11:18:08AM Page 3 of 5 COMPASS 5000. 1 Build S1D
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
0.00usft
Reference Well:
E-35
Well Error:
0.00usft
Reference Wellbore
E -35C
Reference Design:
E -35C WP04
BP
Anticollision Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well E-35
Mean Sea Level
KB @ 65 29usft (E-35)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
E
E-38 - E-38 - E-38
11,113.28
9,000.00
842.69
92.07
756.80
Pass - Major Risk
E-38 - E -38P81 - E -38P61
11,113.28
9,000.00
842.69
92.20
756.67
Pass - Major Risk
E-38 - E -38P82 - E-38PB2
11,113.28
9,000.00
842.69
92.20
756.67
Pass - Major Risk
2/5/2019 11:18:08AM Page 4 of 5 COMPASS 5000 1 Build 81D
by
BP
Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well E-35
Project:
PBU
7VD Reference:
Mean Sea Level
Reference Site:
E
MD Reference:
KB @ 65.29usft (E-35)
Site Error:
0 00usft
North Reference:
True
Reference Well:
E-35
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1 00 sigma
Reference Wellbore
E -35C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
E -35C WP04
Offset ND Reference:
Offset Datum
Reference Depths are relative to KB @ 65.29usft (E-35) Coordinates are relative to: E-35
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.26°
Ladder Plot
-X- E-35,E-35PB1,E-35PB1 V3$ FOS Mb-p,�V000 usn)$ E -38,E -38,E -38V1
e8u
-� E -35,E -35A, E -35A V5 $ E-101, E-101, E-101 V4 -$- E-38, E-38PB2, E-38PB2 V1
$ E-103, E-103, E-103 wp05 V1
E -15,E -15C, E -15C V9
$ E -14,E -14A, E -14A V2
-e-- E-1 03, E-1 03PB1, E-1 03ph wp05 V1
-- E-15,E-15APB1,E-15APB1V2
-- E -14,E -14,E -14V1
$ E-103,E-103PB1,E-103PB1 V15
-B- E -15,E -15,E -15V3
E-28,E-28AP131,E-28APB1 V1
E -31,E-31 A, E-31 A V31
$ E -15,E -15A, E -15A V2
-- E -28,E -28A, E -28A V2
-� E-31, E-31, E-31 V6
$ E -15,E -15B, E -15B V2
$ E -28,E -28,E-28 V 1
-¢- E -01,E-01 A, E-01 A V4
- E-15,E-15APB2, E-15APB2 V2
$ E-03, E -03A, E -03A V3
$ E -01,E -01,E-01 V1
E -15,E -15D, E -15D VO
$ E-03, E-03, E-03 V3
$ E-01,E-01APB1,E-01APB1 V1
-#- E-15,E-1513P131,E-1513PB1 V2
- E-13,E-13A,E-13AV1
$ E-01, E-01 B, E-01 B VO
-$- E-26, E -26A, E -26A V4
-- E -13,E -13,E-13 V 1
21512019 11 18:08AM Page 5 of 5 COMPASS 5000 1 Build 81D
Site: E
AilmulsmTrteNarlh WELLBORE DETAILS: E -35C REFERENCE INFORMATION
Project: PBU Mapnetc Nada: tsso°I
0 by
Well, E-36 Mae f i tl E -35C C-Idl.t.(W Reference. WaIE35,Tme North
Strengui 57473E n1� Ven.1(TVD)Wer- Mean Sea Leval
Wellbore: E -36C �D@'93�W Parent Wellbore: E-35PB1 Section lV6) Reference: slot-(0.00N.0.00E)
Plan: E•35CW�04 MatletBGGM707�easuradDeplhRaterence. KB@65.29usn(E-J5)
I_ Ti.Tie on MD: 8563.28
___ . I-__ - -._ .-__. _._ Cekulation Method: Minimum CuNalure
1400
1200
r ---------------------
SECTIONDETAILS
---------------
_ _ ANNOTATIONS
E -35C V !t Pdl't
- --
I000
Sec MD Inc Azi
sSTVD 44-S +E/ -W
Dleg
TFace VSect Target
TVD MD Annotation
C
1 8563.28 31.70 228.00
8476.22 -118.65 -206.63
0.00
0.00 -0.61
8476.22 8563.28 E-35PB1 Actual Survey -TIP
800
2 8575.00 32.89 228.08
8486.13 -122.84 -211.29
10.16
2.09 -1.93
8486.13 8575.00 KOP
3 8595.00 31.09 228.08
8503.09 -129.91 -219.17
9.00
180.00 -4.17
8503.09 8595.00 End 9deg/100ft
E-35CT4
4 8635.00 27,89 228.08
8537.90 -143.07 -233.82
8.00
180.00 -8.33
8537.90 8635.00 4 1O
600
'I'D
5 8830.92 30.46 196.01
8710.00 -221.90 -281.91
8.00
-95.00 52.96
8710.00 8830.92 End Bdeg/100ft
O
"
at 11317.65
e-35CT3
6 9023.85 65.84 217.98
8837°49 -342.88 35224
20.00
33.19 -123.15
8837.49 9023.85 6400
E-35CWR04
7 9725.90 94.00 73.40
9107.63 58822 -38.45
20.00
-114.97 -578.63
9107.63 9725.90 7
+
8 10097.90 89.39 359.08
9094.76 .408.84 165.95
20.00
-91.75 -437.33
9094.76 10097.90 End 20deg/1008
=zoo
9 10282.90 89.44 21.29
9096.67 -227.90 198.46
12.00
90.00 -296.31
9096.67 10282.90 9
-
10 10562.90 89.53 347.68
9099.26 4725 220.04
12.00
-90.00 58.05
9099.26 10562.90 10
2
11 10827.90 90.13 315.89
9100.06 277.78 96.36
12.00
59.00 193.47
9100.06 10827.90 11
o
KOE
12 1 0986.74 108.00 309.14
9075.11 383.46 -18.57
12.00
-20.00 342.22
9075.11 10986.74 12
C `
End9deg/100ft
0
13 11096.74 108.00 295.26
9041.12 439.08 -106.87
12.00
-90.00 434.30
9041.12 11096.74 13
14 11182.65 100.00 288.55
9020.33 470.06 -184.13
12.00
-140.00 499.51
9020.33 11182.65 14
J-..
-200
End Bdeg l0oft q
15 11317.65 100.00 305.01
8996.89 529.76 -302.41
12.00
90.00 609.99
8996.89 11317.65 TD at 11317.65
%
E -35C T I " 9
___. _...._
-400'
6
d 20deg/100ft
-600
_7 - E -35C T2
800
-1000
_
F-SPnI
y
-1200......
180.__,__
- -
0 1600 -1400 1200
-1000 -800 600^-40800
00 -200 0 200 400 600 800 1000 1200 1400 1600 1600
West( -)/East(+) (200 usft/in)
830U�
fl400.,,
E -35C
WP04
L'-35PD1A.tea1
Surv.V-TIP
O 85001
'KOP
-
4 E3 d9dc8/10011
8G00-
O
O
8700
l:asc n
y 8800-
I'-+>I'Iii
EnJ Sdeg/10011
Q
U 8900.' r.
'
G
:
E-3 5C 14
90001
1.15C W,114
a
4]
7
9100
E-351: T3
'IU at 11317 GS
14
13
9200 �.
9300
E -35C T2
EnJ 203.8/10011
9 10
12
II
-935 -880 -825 -770 -715 -660 -605 -550
Mean Sea Level
-495
-440 385 -330
_. _.."110
275 - -220 -165 -110 55 0 -- 55
165 220 275 330 385
440 495 550 605- 660 715 770 825 - 890 935 990 1045 1100 1155 1210
Vertical Section at 330.28°
(55 usft/in)
Project: PBU
Site: E
Well: E-36
Wellbore: E -36C
j Plan: E -36C WP04
ANTI -COLLISION SETTINGS
8750
8750
9150
COMPANY DETAILS: North America - ALASKA - BP
Interpolation Method: MD, Interval: 25.00
Depth Range From: 856328 To 11317.65
9700
Calculation Method: Minimum Curvature
Results Limited By: Centre Distance; 1328.39
Reference: Plan: E -35C WP04 (E -351E -35C)
11318
Error System: ISCWSA
Scan Method: Tw Cylinder North
Error Surface: EllipticalConic
Warning Method: Rules Based
tvteasurea ueptn (iuu ustt/In)
EJS, E- aEEJS V2 + EUt, 1.1, E-01 V, E-05, ELSC, —. a E-15 E-150, E-158 Vp -EJ6, E.36A, E-364 VS
+EO1,E t Pitt, E-BtAPB1 Vt aEd5, EO50,E85B V0 �E-0J E03,E-0]V3
EJS, EaWBt. E- J - Ut. EU1B. E-018 v0 -' E-15 E-15BPB1, E-15BP8111 . E-36, EJ68. E368 V0 E -1J, E-114, E-1>4 V t
JS. EJSA, E-]$AVS1V E EUS, EUX, EUSA V1 «E -2q E -2W, E -261V4 +-6 EJB, —Vt •E -1J. E-17,E-1]Vt
E iD3. E 1 - — E— E -02q V0 - E-101, E.1D1, E-10 V4 - E-26. E-26 E -M V4 a EJB, EJBPB2, E-
0]. E-107 V] c EU2, EV2AP81, EU14PB1 VO - E-15. E -15E, E -15E Vo E-29. E -29q, E -29A V2 —2 V 1 E-06, ELS, EU6 V1
+E-103, E-11 E-11 wrW V1 �EU2, E-02. EU2V1 <E.15. E -t SC.Ei5C V9 EJ6 EJBPBI, 81 V1 dEU6. EiCJ1, E-0 64 V4
E-1DJ - E-t6Jpn wP65 V 1 « EU2, EU2B E- - E 2B. E.— Ppn 62 V4 + E-12. E -12A. E—VQ
D2B V0 » E -t5, E-15AP81. E I-1 v2 + E-28 E -2B, E-29 V, +E-101, E-1WPB1, E-103PB1 V15 + EU4, E -04A, E -D44 V3 x E-15, E-15 E-15 V7 .- Eit, r— El— + E-14. E-14 81 Ev1V2 E-12
EJt, E -31A E -]1A t Up, E-04 EU4 V1 + 615. E-1. E154V2 . E -2B, E-264PB1. E—Bi vt E t6
Jt, E-]1 V6vJ a5, EUS. EUS V t ^' E33. EJ], EJ3 V1 + E -2B. E -.A, E-284 v2 PB - 164P81, E- , vD
E -E-15. E-158 E-158 V2 --,—B. EJJB VD 26.E -2B V1
EJIq, E-0Iq VE . EUS, EU54P81, EU63PBt v1 - E-15. E-1— E -161P82 V2 E-76, EJ6. EJ6 Vt + E -0J, EU]A. EUN vJ a EJSC —, VD
From Colour To MD
8563
8750
8750
9150
9150
9700
9700
10100
10100
11318
SURVEY PROGRAM North America -ALASKA- BP
Depth From Depth To Survey/Plan Tool
302.15 856328 E -35P81 Survey 1 MWD -Standard (E-35PB1r1AWD
8563.28 11317.65 E -35C =4 (E -35C) MWD
Project: PBU
Site: E
TAILS:
ANTFCOLLISION SETTINGS
COMPANY DETAILS: North America - ALASKA - BP
0.50
Interpolation Method: MD, interval: 25.00
Calculation Method: Minimum Curvature
Well: E-36
nNorhUng:
975877.210
Depth Range From: 856328 Tc 11317.65
Error System: ISCWSA
Wellbore: E -35C
64470.460
Results Limned By: Cenhe Distance: 1328.39
Scan Method: Tray. Cylinder North
Plan: E-38CWP040a
20'25.430N
39' 54.924 W
Reference: E -35C WP04
Error Surface: ElIipticalConic48°
10.16 2,09 -1.93
3
8595.00 31.09 226.08
Warning Method: Rules Based
Depth Range: 8563.28T01317.65 11317.65
From Colour To MD
Depth Range: 8563.28 To 11317,65
40
33&-- -_0 _
2 855 30
10 12 _
0031 0
E-16AP 999" _
300, - -�J----��.. 60
X120
>C.. _. 100 9815
�H 9771
T0044 2b V
575 ---�-. --------_ . ---�---� - --BUD
SECTION DETAILS
Sec
MD Inc AA
TVD +WS
-E/-W
Dleg TFace VSect
1
8563.28 31.70 228.00
8476.22 -118.65
-206.63
0.00 0.00 -0.61
2
8575.00 32.89 228.08
8486.13 -12284
-211.29
10.16 2,09 -1.93
3
8595.00 31.09 226.08
8503.09 -129.91
-219.17
9.00 180.00 4.17
4
8635.00 27.89 228.08
8537.90 -143.07
-233.82
8.00 180.00 5,33
5
8830.92 30.46 196.01
8710.00 -221.90
-281.91
8.00 -95.00 -52.96
6
9023.85 65.84 217.98
8837.49 -34288
-352.24
20.00 33.19 -123.15
7
9725.90 94.00 73.40
9107.63 588.22
-38.45
20.00 -114.97 578.63
8
10097.90 89.39 359.08
9094.76 408.84
165.95
20.00 -91.75 -437.33
9
10282.90 89.44 21.29
9096.67 -227.90
198.46
12.00 90.00 -296.31
10
10562.90 89.53 347.68
9099.26 47.25
220.04
12.00 -90.00 58.05
11
10827.90 90.13 315.89
9100.06 277.78
96.36
12.00 59.00 193.47
12
10986.74 108.00 309.14
9075.11 383.46
-18.57
12.00 -20,00 342.22
13
11096.74 108.00 295.26
9041.12 439.06
-106.87
12.00 -90.00 434.30
14
11182.65 100.00 288.55
9020.33 470.06
-184.13
12.00 -140.00 499.51
15
11317.65 100.00 305.01
8996.89 529.76 -302.41
12.00 90.00 609.99
100
SURVEYPROGRAM
E-35
Depth From Depth To Survey/Plan
Tool
302.15 8563.28 E-35PB1 Survey 1 MWDStandard (E-35PBMWD
8563.28 11317.65 E -35C WP04 (E -35C)
150'
MWD
Depth Range: 8563.28 To 11317,65
40
33&-- -_0 _
2 855 30
10 12 _
0031 0
E-16AP 999" _
300, - -�J----��.. 60
X120
>C.. _. 100 9815
�H 9771
T0044 2b V
575 ---�-. --------_ . ---�---� - --BUD
87201-
720884
8 84-x_:40.... .9742
50
16ba6 60
617 88
60
9735
80
70�
120 E.3,571
SM9
100
24
120
10035
120
80
140
E -16A
��-_ 160
E -35A'
90
-- 180
100
E-35
'1H0� - _
.200
210 '-
150'
150
- 220
E -16A
110
E-16 ��_ 240
leo
120
Travelling Cylinder Azimuth (TFO+AZI)1°] vs Centre to Centre Separation
130 usrein]
E-36 E-36 E-35 V2
E41. E-01. E -D1 V1
E.M. -C. E-OSL VO
E-15, E-150, E-150 W E-36 E -M, E -3W V5
E-03, E-03. E-03 V3
160
Travelling CylinderAzimuth (TFO+AZI) 1*] vs Centre to Centre Separation
E-35. E -35B. E -35B VO
E-36 E-35Pe1. E-11 V3
E41, E-01-1, E-01AP81 V1
E41, 1418, E41B Vo
EAS, E-065, E-058 VD
E-15, E-15BPB1, E-158PB1 V2 E-36 E-368, E -MB VO
E-13. E-, E-134 V1
[10 usftlin]
E35, E -35A, E- S V5
E42. E42A, E -M VO
E -W, E454, 8E-064 VI
E-101. E-101, E-101 V4
E-26 E -26A, E -26A V4 E -Y, E-38, E-36 V1
E-26 E-26, E-26 V4 E-38. E- PB2, E -M- V1
E-13, E-13. E-13 V1
E -O6 E-06 E -OB VI
E -1W, E -1W, E -1W V7
E42, E42APB1, E42AP81 VO
E-15, E -E. E -15E VO
E-26 E-244, E-244 V2 >e, E-3BPB1, E-36PB1 V1
E -1W, E-iW, E-103 wP0 V1
E-02, E-02. EA2 V1
E-15. E -15C. E -15C V9
E-26 Plan V4 E-14, E-144, E- V2
-, E-0BA, E-084 V4
E-12,
E -t W, E-1 WP81, E-1 WE-.
pl, Mp05
Vt E-02, E -02B. E -02B VO
E-15, E-15APB1, E-184PB1
V2 E-29. E -2B, E-29 V11 E-14. E-14, E-14 V1
E --VO
E-1 W, E -f WP81. E-1 WPB1 V15
E-04, E -04A, E.- V3
E-15, E-15, E-15 V3
E -W. E-334, E -33A V2 E-23, E-28AP81, E-2MPBI V1
E-12, E-12, E-12-12 V1
E-16, E-16, E-16 V1
E-31, E -31A. E -31A V31
E-04. E-Dd, E-04 V1
E-15. E -15A. E-1 5A V2
E-33, E-37, E -W V1 E-28, E -28A, E -28A V2
E-16 E-16AP81, E-164PB1 VO
E-31, E-31, E-31 V6
E46. E -W, E45 V t
E-15, E-158. E -15B V2
E- E -B, E-330 V0 E-28, E -2B, E -2B V1
E-16, E-164, E-1 W V0
E-01, E -01A, E41A V4
E-05. E-OSAPB1, E-09APB1 V1
E-15. E-15APB2. E-15APB2
V2 E->6. E-38 E-36 V1 E -W, E-035, E -0]A V3
E -35C WP04
bp$I�e
0Wellbore:
Project: PBU
E
Well: E36
E -36C
j Plan: E -36C WP04 Plus 600FtMD
-- --- --- --- ----.
MimwssmT N ra,
�reE N rN 169D9
rroc F u l
6 DiDngle:80..95'1
I
Madel eGGM39t 'i.
WELLBORE DETAILS E -36C
E•36C
E-35PB1
Tie on MD* 8563.28
REFERENCEiNFORWTION
True North
Co-Vetl'ticai ND)Reference Meain sea
section VsjReference slot -(6.69N oe69E)
Measured Depth Reference: KB@ 65.29usff(E-35)
Calculation Wthad. Minimum Curvature
masung ( iuu usmrn)
Mean Sea Level
North America - ALASKA - BP
PBU
E
E-35
E -35C
E -35C WP04 Plus 500ft MD
AOGCC Offset Well Report
05 February, 2019
lip
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
0.00usft
Reference Well:
E-35
Well Error:
0 00usft
Reference Wellbore
E -35C
Reference Design:
E -35C WP04 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well E-35
Mean Sea Level
KB @ 65.29usft (E-35)
True
Minimum Curvature
1 00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference E -35C WP04 Plus 500ft MD
Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria WARNING: There is hidden tight data in this project
Interpolation Method: MD Interval25.00usft Error Model: ISCWSA
Depth Range: Unlimited Scan Method: Tray. Cylinder North
Results Limited by: Maximum center -center distance of 200,00usft Error Surface: Elliptical Conic
Survey Tool Program Date 2/5/2019
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
302.15 8,563.28 E-35PB1 Survey 1 MWD -Standard (E -35P MWD MWD - Standard
8,563.28 11,817.65 E -35C WP04 Plus 500ft MD (E -35C) MWD MWD - Standard
Summary
21512019 11 5034AM Page 2 of 3 COMPASS 5000.1 Build 81D
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design 9
(usft)
(usft)
(usft)
E
E-01 - E-01 - E-01
960.69
950.00
62.90
E-01 - E -01A- E -01A
960.69
950.00
62.90
E-01 - E-01APB1 - E-01APB1
960.69
950.00
62.90
E-01 - E-01 B- E-01 B
960.69
950.00
62.90
E-03 - E-03 - E-03
780.60
775.00
130.71
E-03 - E -03A - E -03A
780.60
775.00
130.71
E-04 - E-04 - E-04
683.06
675.00
31.77
E-04 - E -04A - E -04A
682.64
675.00
31.77
E-05 - E-05 - E-05
1,988.79
1,975.00
151.86
E-05 - E -05A - E -05A
1,988.79
1,975.00
151.86
E-05 - E-05APB1 - E-05APB1
1,988.79
1,975.00
151.86
E-05 - E -05B - E -05B
2,010.34
2,000.00
152.21
E-05 - E -05C - E -05C
2,010.34
2,000.00
152.21
E-103 - E-103 - E-103
1,922.32
1,975.00
163.48
E-103 - E-103 - E-103 wp05
1,922.32
1,975.00
163.48
E-103 - E-103PB1 - E-103PB1
1,922.32
1,975.00
163.48
E-103 - E-103PB1 - E-103ph wp05
1,948.01
2,000.00
150.58
E-16 - E-16 - E-16
10,045.39
9,17500
71.11
E-16 - E-1 6A - E-1 6A
9,759.49
9,250.00
61.10
E-16 - E-16APB1 - E-16APB1
9,993.59
9,057.00
168.68
E-35 - E-35 - E-35
8,881.11
8,900.00
129.60
E-35 - E -35A- E -35A
8,881.11
8,900.00
129.60
E-35 - E-356 - E -35B
8,881.11
8,900.00
129.60
E-35 - E -35C - E -35C WP04
11,317.65
11,317.65
0.00
E-35 - E-35PB1 - E-35PB1
8,881.11
8,900.00
129.60
21512019 11 5034AM Page 2 of 3 COMPASS 5000.1 Build 81D
by
tit
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
E
Site Error:
0.00usft
Reference Well:
E-35
Well Error:
0,00usft
Reference Wellbore
E -35C
Reference Design:
E -35C WP04 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well E-35
Mean Sea Level
KB @ 65 29usft (E-35)
True
Minimum Curvature
1 00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to KB @ 65.29usft (E-35) Coordinates are relative to: E-35
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK
Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.26°
21512019 11:50 34AM Page 3 of 3 COMPASS 5000 1 Build 81D
Well Bighole 4 Ram BOP Schematic (example) Date
*Note: Updated schematic will be submitted once rig contracts are final.
UUICK i est sub to Ut
Top of 7" Otis
Distances from top o
Excluding quick -test
Top of Annular
Top of Annular Elemi
Bottom Annular
CL Blind/Shears
CL 2-3/8" Pipe/Slips
CL 2-3/8" x 3-1/2" VBR
CL 2-3/8" Pipe/Slips
CL of Top Si
CL of Flow C
CL of Master
LDS
LDS
/Ground Leve
1 1
e
Hose
Well Slimhole 4 Ram BOP Schematic (example) Date
*Note: Updated schematic will be submitted once rig contracts are final.
Quick Test Sub to Otis 1.1 ft —' —' —' —' —' -
Top of7"Otis 0.0 ft —.—.—.—._._._.—. —.—.—.—.—._
CDR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
4 7-1116" 6k Flange X 7" Otis Box
Top of Annular 6.0 ft
Top of Annular Element 6.7 ft
Bottom Annular 8.0 ft
CL Blind/Shears 9.3 ft
CL 2" Pipe/Slips 10.1 ft
81
Kill Line
Cr 2-3/8" x 3-1/2" VBRs 12.6 ft
CL 2" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft
CL of Flow Cross 17.4 ft
CL of Master 18.8 ft
LDS
LDS
Ground Level
1/16" Annular I
B2 s Bs 41,B4
Swab
T1 .6e T2
Master
IA
OA
Choke Line
Test Pump Hose
Davies, Stephen F (DOA)
From: Browning, Zachary H <Zachary.Browning@bp.com>
Sent: Wednesday, April 3, 2019 6:25 AM
To: Davies, Stephen F (DOA)
Cc: Schwartz, Guy L (DOA); Lastufka, Joseph N
Subject: RE: PBU E-35 (PTD 219-049) - Questions
Steve,
There were no changes to any of the attachments listed below.
Thanks, Zach
From: Davies, Stephen F (DOA) <steve.davies@alaska.gov>
Sent: Tuesday, April 2, 2019 5:50 PM
To: Browning, Zachary H <Zachary.Brown ing@bp.com>
Cc: Schwartz, Guy L (DOA) <guy.schwa rtz@alaska.gov>
Subject: PBU E-35 (PTD 219-049) - Questions
Zach,
I'm reviewing BP's second Permit to Drill application for PBU E-35. Since the initial application was denied, AOGCC's file
for that application was closed. New Permit to Drill and API Numbers will be assigned to the second application. To that
end, I am assuming that the BP Coiled Tubing Report, Anti -collision Summary Report, AOGCC Offset Well Report, and
Casing/Tubing Attachment that accompanied the initial application remain unchanged. These reports and the
attachment did not accompany BP's second application, but to save time I can photocopy them if they remain
unchanged. Please confirm that there are no changes. Has anything changed on the three schematic drawings that
accompanied the initial application changed? If not, I will photocopy them too.
Thank you,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov.
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
C
PTD:l�`r7
Development Service _ Exploratory _ Stratigraphic Test Non -Conventional
FIELD: s POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50- - - -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -) from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150
PTD#: 2190490 Company BP EXPLORATION (ALASKA) INC Initial Class/Type
Well Name: PRUDH-QE BAY UNIT E_35C._ _. Program DEV Well bore seg
DEV / PEND GeoArea 890 Unit 11_650 On/Off Shore On Annular Disposal
Administration
1
Permit fee attached_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NA.
2
Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
.... Entire well in ADL0028304
3
Unique well. name and number _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
Previous application for PBU E-35C was DENIED. That redrill was renamed PBV E-35CXX -
4
Well located in.a defined pool......... . . . . ... _ _ _ _ _
Yes
_ - - PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341E
5
Well located proper distance from drilling unit. boundary .. .... _ _
Yes
_ CO 3416, Rule 2: There shall be no. restrictions. as to well spacing except that no pay shall be
6
Well located proper distance from other wells _ _ _ ......
Yes
_ opened in a well closer than 500 feet to the boundary of the. affected. area. Planned well conforms to CO
7
Sufficient acreage available in.drilling unit_ _ _ _ ...... _ _ ......
Yes
_ _ 341G, Rule 2.-
8
If deviated, is wellbore platincluded.. _ _ _ _ _
Yes
9
Operator only affected party- - - - - - - - - - -
Yes
10
Operator hasappropriatebond in force _ _ _ ...... _ _ ..... _
Yes
11
Permit can be issued without conservation order- - - .......... . . . .
Yes
Appr Date
12
Permit can be issued without administrative approval _ _ _ _ _ _ _ _ _
Yes
13
Can permit be approved before 15-0aywait.
Yes
SFD 4/3/2019
_
14
Well located within area andstrataauthorized by Injection Order # (put. 10# in. comments). (For.
NA...
15
All wells within 1/4 mile area of review identified (For service well only). - - - _
NA
16
Pre-produced injector; duration of pre production less than 3 months. (For service well only) ..
NA--
17
Nonconven. gas conforms to AS31,05,030Q.1. A),Q:2.A-D) . _ _ _ _ _
NA___
118
Conductor string. provided .. _ _ . . . . . . . . . . . . ................. _
NA- - _
..... CTD sidetrack from existing well
Engineering
19
Surface casing. protects all-known USDWs.. ....
- - -
NA _ _ _
. _ ...CTD sidetrack from existing well - _ _ ...... .
20
CMT, vol adequate to circulate on conductor& surf csg ...... . . . . ....... . .
NA.....
_ _ _ CTD sidetrack from existing well....
21
CMT vol adequate to tie-in long string to surf csg. . . . . . . . . ......... . _ ..
NA. _ _
_ _ _ . CTD sidetrack from existing well
22
CMT will coverall knownproductivehorizons. _ _ _ _ _ _ _ ..
Yes
_ _ . - 3-1/4" liner wit Oot be cemented with small volume variance approved with expected.Kingkak. swelling _
23
Casing designs adequate for CJ, B &- permafrost ........ _ _ ...... _
Yes
24
Adequate tankage or reserve pit . _ _ _ .... _ _ _
Yes
_ _ - Rig CDR 2.will be ongoing operations-
25
If a-re-drill, has 10-40for abandonment been approved _ _ _
Yes
Voa--. e...�-e .4-o- zq-ry/iCrL /%u�-%��/�yyle_��_
26
Adequate wellbore separation proposed. - - - _ _ _ _ _
Yes ...
All offset wells pass BP separation criteria
27
If diverter required, does it meet regulations_ _ _ _ _ .. _ . - -
NA - -
_ _ _ _ . CTD sidetrack from existing well
Appr Date
11128
Drilling fluid. program schematic & equip list adequate_ _ ...... _ _ _ _ _ ....
Yes
... _
MGR 4/10/2019
29
BOPEs, do they meet regulation -- - - - - - - - - - - - - - - - - - - - - - - - ---- -
Yes _ .
_ _ Coil Tubing ROPE tested to 3500 psi - -
30
BOPE-press rating appropriate; test to-(put prig in comments) _ _ _ _ _
Yes
_ 5000 psi rated BODE
131
Chokemanifold complies w/API_RP-53 (May 84)- - - - .. .. _ _ _ _ _ _ _
Yes
!32
Work will occur without operation shutdown--_Yes
. _
_ _ Rig CDR.2. will be ongoing operations
33
Is presence of H2S gas. probable - - - - - - - _ _ _ _ - - - _ - .
Yes - -
- - - . E pad is an H2$ pad, Standard 112S. monitoring will be utilized
34
Mechanical condition of wells within AOR verified (For service well only) _ _ _ _ .. -
NA _
..... Development well
35
Permit can be issued w/o hydrogen. sulfide measures _ _ _ . _ _ ... _
.No_ _ ..
_ _ _ E-Pad wells are. H2S-bearing. H2S measures are required. ......
Geology
36
Data. presented on potential overpressure zones _ _ _ _ _ ..
Yes _ ..
- - - - Planned mud weights appear adequate to control the operator's forecast of estimated pore pressures. -
Appr Date
37
Seismic analysis of shallow gas. zones- - - _ ... _ _ _ ..... _ _ ..
NA - _
_ _ _ . Should higher-pore. pressures be encountered, BP has immediate access to nearby fluidmixingfacilities..... .
SFD 4/3/2019
38
Seabed condition survey-(if off-shore) ...NA..
-
- - - - - Managed pressure drilling. techniques may be utilized to improve hole stability..
39
Contact.name/phone for weekly progress reports[exploratoryonly]........ _ _ _
NA- - -
.. _
Geologic . Engineering Date Public Date Four fault crossings: medium risk of lost circulation. Noted in Drilling Hazards section of application. SFD