Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-051Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 12/05/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20241217 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BCU 12A 50133205300100 214070 8/17/2024 YELLOWJACKET GPT-PERF BCU 19RD 50133205790100 219188 9/26/2024 YELLOWJACKET PERF-GPT BCU 24 50133206390000 214112 8/19/2024 YELLOWJACKET PERF BCU 25 50133206440000 214132 9/27/2024 YELLOWJACKET PLUG-PERF BLOSSOM 1 50133206480000 215015 9/30/2024 YELLOWJACKET GPT-PLUG-PERF HV B-17 50231200490000 215189 9/23/2024 YELLOWJACKET GPT KU 24-7 50133203520100 205099 10/3/2024 YELLOWJACKET PERF KU 13-06A 50133207160000 223112 12/5/2024 AK E-LINE Plug Setting KU 22-6X 50133205800000 208135 12/8/2024 AK E-LINE Perf KU 23-07A 50133207300000 224126 12/7/2024 AK E-LINE CBL MPU L-17 50029225390000 194169 10/5/2024 YELLOWJACKET PERF MPU R-103 50029237990000 224114 10/14/2024 YELLOWJACKET CBL MPU C-23 50029226430000 196016 11/29/2024 AK E-LINE Plug/cement MPU D-01 50029206640000 181144 11/26/2024 AK E-LINE Perf PBU 13-24B 50029207390200 224087 9/26/2024 YELLOWJACKET CBL PBU 06-07A 50029202990100 224043 9/29/2024 BAKER MRPM PBU 06-18B 50029207670200 223071 10/1/2024 BAKER MRPM PBU 07-32B 50029225250200 204128 10/28/2024 BAKER SPN PBU 14-32B 50029209990200 224073 10/12/2024 BAKER MRPM PBU H-13A 50029205590100 209044 10/23/2024 BAKER SPN PBU L2-20 50029213760000 185134 10/7/2024 BAKER SPN PBU L3-22A 50029216630100 219051 10/9/2024 BAKER PEARL 10 50133207110000 223028 9/25/2024 YELLOWJACKET GPT-PERF PEARL 11 50133207120000 223032 8/29/2024 YELLOWJACKET GPT-PLUG-PERF SRU 241-33 50133206630000 217047 8/23/2024 YELLOWJACKET PERF Please include current contact information if different from above. T39863 T39864 T39865 T39868 T39869 T39870 T39871 T39872 T39873 T39875 T39874 T39867 T39866 T39876 T39877 T39880 T39878 T39879 T39881 T39882 T39883 T39884 T39885 T39886 T39887 PBU L3-22A 50029216630100 219051 10/9/2024 BAKER Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.12.18 08:35:44 -09'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU L3-22A Greenstick IC Test Void Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-051 50-029-21663-01-00 13699 Conductor Surface Intermediate Liner Liner 8837 80 4071 9481 614 4014 12710 20" 13-3/8" 9-5/8" 7" 4-1/2" 8860 47 - 127 47 - 4118 45 - 9526 9352 - 9966 9683 - 13697 47 - 127 47 - 4022 45 - 8481 8319 - 8858 9683 - 8837 none 470 1950 4760 5410 8540 12710 , 13150 1490 3450 6870 7240 9020 11150 - 13577 4-1/2" 12.6# 13Cr85 43 - 9694 8930 - 8840 Structural 4-1/2" HES TNT Perm , 9575 , 8526 CAMCO TRDP1A-SSA , 2010 , 2010 9575 8526 Bo York Operations Manager Ryan Holt Ryan.Holt@hilcorp.com (907) 564-5102 PRUDHOE BAY, LISBURNE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028322 , 0028323 43 - 8633 Starting Head - IC Test Void Pumped approximately 3/4 cup of Greenstick to 3500 psi 548 608 1622 1452 1595 1897 2308 2274 610 592 N/A 13b. Pools active after work:LISBURNE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:54 pm, Nov 12, 2024 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Date: 2024.11.12 12:31:56 - 09'00' David Bjork (3888) DSR-11/21/24 RBDMS JSB 111824 WCB 2-7-2025 ACTIVITYDATE SUMMARY 10/19/2024 T/I/O = 550/2260/710. Temp 110°. Greenstick IC void (eval IAxOA). ALP = 2280 psi, online. Pumped ~1/3 of a gun into IC packing void. Appears to be not taking any more greenstick. Final WHPs = 550/2260/730. PPPOT-IC: Stung into test void with HPBT, 0+ psi. Bled void to 0 psi. Monitored for 10 min, pressure unchanged. Pressure IC void to 3500 psi, lost 70 psi in 1st 15 min, lost 30 psi in 2nd 15 min for a PASS. Bled void to 0 psi. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30 Daily Report of Well Operations PBU L3-22A () Pumped ~1/3 of a gun into IC packing void. Appears to be not taking any more greenstick. 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU L3-22A Greenstick IC Test Void Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-051 50-029-21663-01-00 13699 Conductor Surface Intermediate Liner Liner 8837 80 4071 9481 614 4014 12710 20" 13-3/8" 9-5/8" 7" 4-1/2" 8860 47 - 127 47 - 4118 45 - 9526 9352 - 9966 9683 - 13697 47 - 127 47 - 4022 45 - 8481 8319 - 8858 9683 - 8837 none 470 1950 4760 5410 8540 12710 , 13150 1490 3450 6870 7240 9020 11150 - 13577 4-1/2" 12.6# 13Cr85 43 - 9694 8930 - 8840 Structural 4-1/2" HES TNT Perm , 9575 , 8526 CAMCO TRDP1A-SSA , 2010 , 2010 9575 8526 Bo York Operations Manager Ryan Holt Ryan.Holt@hilcorp.com (907) 564-5102 PRUDHOE BAY, LISBURNE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028322 , 0028323 43 - 8633 Wellhead IC Test Void Pumped ~ 12 cups of Greenstick to 3500 psi 199 174 287 1162 1921 1973 2222 2304 586 606 N/A 13b. Pools active after work:LISBURNE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:42 pm, Sep 05, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.09.04 16:19:09 - 08'00' Bo York (1248) DSR-9/11/24 RBDMS JSB 091124 WCB 10-3-2024 ACTIVITYDATE SUMMARY 8/1/2024 T/I/O = 580/2240/640. Temp = 106°. Bleed OAP to 10 psi (eval TxIA). ALP = 2360 psi, online. OA FL @ 240'. Stung into IC void: 2200 psi. Bled OAP to BT to 10 psi in 2 hrs 30 min (gas). IC void unchanged. Attempted to bleed IC void to 0 psi without success. Torqued LDS to 450 FT/LBS. Did not do PPPOT-IC. Monitored OAP for 30 min. OAP increased 10 psi. Final WHPs = 580/2240/20. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30 8/3/2024 T/I/O = 720/1520/160. Temp = 108°. Bleed IAP to 0 psi, Greenstick IC (eval IAxOA). ALP = 1600 psi, online. IA FL @ 9350' (122' above sta# 1, SO). DSO SI well, TP @ 860 psi. T FL @ 6190' (525 above sta# 5, Dome). Bled IAP to OT to 15 psi in 7 hrs, TP unchanged, & OAP decreased 20 psi. IA FL inflowed to 4113' (sta# 6, Dome, 280 bbls), Monitored for 30 min. IAP unchanged. Final WHPs = 860/15/140. SV, WV = C. SSV, MV = O. IA, OA = OTG. 17:30 8/4/2024 T/I/O = 840/0+/0+. Temp = SI. Greenstick IC Packing port (eval IAxOA). Bled IA & OA to 0 psi in 2 min. Hold open bleed on both. Removed check from 10 o'clock side of packing port, J-stick present in IC void. Pumped 1 gun of greenstick, began pushing J-stick out return side. SV, WV = C. SSV, MV = O. IA, OA = OTG. 17:45 8/4/2024 T/I/O = 840/17/140. Temp = SI. Bleed IAP & OAP (pre Greenstick). ALP = 2450 psi, SI @ CV. IA FL @ 4116' (sta # 6 dome). OA FL @ 320' (19 bbls). Bled IAP to 0 psi in 5 hrs, held open bleed for 2 hrs. Bled OAP to 0 psi in 1 hr, held open bleed for 5 hrs. Monitored for 30 min. IAP & OAP unchanged. Final WHPs = 840/0/0. SV, WV = C. SSV, MV = O. IA, OA = OTG. 05:00 8/5/2024 T/I/O = 840/0+/0+. Temp = SI. Greenstick IC (eval IAxOA). Bled IA & OA to 0 psi in 2 min. Hold open bleed on both. Begin pumping greenstick into IC void, J-stick present in IC void. Pumped ~1.5 guns of greenstick, J-stick still coming from return side (mixture of both). SV, WV = C. SSV, MV = O. IA, OA = OTG. 17:30 8/6/2024 T/I/O = 840/0+/0+. Temp = SI. Greenstick IC (eval IAxOA). Bled IA & OA to 0 psi in 2 min. Hold open bleed on both. Begin pumping greenstick into IC void, J-stick present in IC void. Pumped ~1 gun of greenstick, J-stick still coming from return side (mixture of both). Greenstick solid from return sdie of well. Replace 1" bull plug on return side, continue pumping greestick into void. Pumped 0.5 gun to pack void, appears to be not taking anymore. Total greenstick pumped = ~3 guns. SV, WV = C. SSV, MV = O. IA, OA = OTG. 17:45 8/7/2024 T/I/O = 840/0+/0+. Temp = SI. PPPOT-IC PASSED (eval IAxOA). ALP = 2450 psi, SI @ CV. Heater working properly. IC void = 0+ psi. Bled void to 0 psi. Monitored for 10 min. Void pressure unchanged. Single port unable to purge. Pressured void to 3500 psi. Monitored for 30 min. Void lost 80 psi in he 1st 15 min & 20 psi in the 2nd 15 min for a total loss of 100 psi in 30 min. Bled void to 0 psi. SV, WV = C. SSV, MV = O. IA, OA = OTG. 03:00 Daily Report of Well Operations PBU L3-22A () Begin pumping greenstick into IC void, J-stickggg present in IC void. Pumped ~1.5 guns of greenstick, J-stick still coming from return side (mixture of both) g( ) Removed check from 10 o'clock side of packing port, J-stick present in IC void. Pumped 1 gun of greenstick, begang pushing J-stick out return side. ggg Pumped ~1 gun of greenstick, J-stick still coming from return sidegg g (mixture of both). Greenstick solid from return sdie of well. Replace 1" bull plug on() g return side, continue pumping greestick into void. Pumped 0.5 gun to pack void,gg g appears to be not taking anymore. Total greenstick pumped = ~3 guns Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:219-051 6.50-029-21663-01-00 PRUDHOE BAY, LISBURNE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13699 12710 8859 9575 None 12710, 13150 8526 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 47 - 127 47 - 127 1490 470 Surface 4071 13-3/8" 47 - 4118 47 - 4022 3450 / 4930 1950 / 2670 Intermediate 9481 9-5/8" 45 - 9526 45 - 8481 6870 4760 Liner 614 7" 9352 - 9966 8319 - 8858 7240 5410 Perforation Depth: Measured depth: 11150 - 13577 feet True vertical depth:8930 - 8840 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 43 - 9694 43 - 8633 9575 8526Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 4014 4-1/2" 9683 - 13697 9683 - 13697 9020 8540 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 5981727347067 3090912 1646 1060 252 560 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Sauve, Mark A Mark.Sauve@bp.com Authorized Name:Sauve, Mark A Authorized Title: Authorized Signature with Date:Contact Phone:+1 907 564 4660 Treatment descriptions including volumes used and final pressure: 13. GPMA/Lisburne Lead PE Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8837 Sundry Number or N/A if C.O. Exempt: N/A CAMCO TRDP1A-SSA 2010 2010 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Set CIBP Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028322 & 028323 PBU L3-22A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Mark Sauve Digitally signed by Mark Sauve Date: 2020.04.21 13:18:37 -08'00' By Samantha Carlisle at 1:34 pm, Apr 21, 2020 DSR-4/21/2020 RBDMS HEW 4/21/2020 SFD 4/28/2020MGR24APR20 ACTIVITYDATE SUMMARY 3/21/2020 CTU#8 1.75" CT. Drift/GR/CCL, Set CIBP MIRU. RIH w/HESS 2.7/8" logging carrier & 3.70" DJN. Load TBG with 228 bbls 1% KCL w/ Safelube. Tag CIBP at 13,136.4' ctm Log from compression up to 9400'. Flagged pipe at 12,700.2'. POOH. Log shows a +11.5' correction, making corrected EOP at flag = 12702.87. Make up and RIH with BOT CIBP. Set top of plug at 12710. Well freeze protected with 38bbl of 60/40. ***Job Continued on 3/22/20*** 3/22/2020 CTU#8 1.75" CT. Drift/GR/CCL, Set CIBP Continue OOH with HST. DSO notified of well status. RDMO. ***Job Complete*** Daily Report of Well Operations PBU L3-22A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS HLULIVE® FGR 1 ') -)n' 1. Operations Performed 7(7- Abandon ❑ Plug Perforations M Fracture Stimulate ❑ Pull Tubing ❑ Opereliogsshytdown * ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Atter Casing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. Set CIBP p 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development RI Exploratory ❑ 5. Permit to Drill Number: 219-051 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stretigraphic ❑ Service ❑ 6. API Number: 50-029-21663-01-00 7 Property Designation (Lease Number). ADL 028322 & 028323 8. Well Name and Number. PBU 1-3-22A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, LISBURNE OIL 11. Present Well Condition Summary: Total Depth: measured 13699 feet Plugs measured 13150 feet true vertical 8837 feet Junk measured None feet Effective Depth: measured 13150 feet Packer measured 9575 feet true vertical 8844 feet Packer true vertical 8526 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor 80 20" 47-127 47-127 1490 470 Surface 4071 13-3/8" 47-4118 47-4022 3450/4930 1950/2670 Intermediate 9481 9-5/8" 45-9526 45-8481 6870 4760 Liner 614 7" 9352-9966 8319-8858 7240 5410 Liner 4014 4-1/2" 9683-13697 9683-13697 9020 8540 Perforation Depth: Measured depth: 11150 -13577 feet True vertical depth: 8930-8840 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.69 13Cr85 43-9694 43-8633 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 9575 6526 true vertical depth) CAMCO TRDPIA-SSA 2010 2010 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 1 895 2619 1774 607 Subsequent to operation. 73 1091 3675 1750 593 14. Attachments: (required per 20 MC 25,070 25 s 25.283) 15. Well Class after work: Daily Report of Well Operations m Exploratory ❑ Development El Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I herebycertify that the foregoing fy regoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA Authorized Name: Sauve, Mark A Contact Name: Sauve, Mark A Authorized Title: GPMA/Lisbume Lea E Contact Email. Mark.SauveQbp.com Authorized Signature: Date: Z lr 0 Contact Phone: +1 907 564 4660 Form 10-404 Revised 04/2017 r' 6*—r-Vr`''�pMY� Dp ��— � ��,2D r o �� FEB 14 2020 Submit Original Only Daily Report of Well Operations PBU L3 -22A ACTNITynATF m uMRM n ev CTU#9 1.75" CT. Job Scope: Depth Log / CIBP MIRU CTU. Perform Weekly BOP Test. Freeze Protect Flowline w/ 4 bbls 60/40 Methanol. Begin Bullheading 1% KCL w/ Safelube down Tbg. 1/23/2020 ***Continue on 1/24/20 WSR*** CTU#9 1.75" CT. Job Scope: Depth Log / CIBP RIH w/ HES 2-7/8" Logging Carrier & 3.70" DJN. Bullhead 213 bbls 1% KCL w/ Safelube. Tag PBTD at 13585'. Log from compression up to 9400'. Flagged pipe at 13100'. Pooh. Confirm good data (+25' correction, correlated to SLB memory PPROF dated 28 -OCT -2019.) MU & RIH w/ Baker 4-1/2" CIBP. Set Top of CIBP at 13150'. Pooh. FP well with 38 bbls 60/40 Methanol. Confirm plug set and ball recovered. Rig Down CTU. 1/24/2020 ***Job Complete*** ELEV= 88.31' 13-318-CSG,68#, 70'A iLEV = 23A4 K55 BTC, 3100' D = 12.415' 4rga= 113" 11014' - -- nMD= 10116' ® q n TVD = 8900' SS 133/8' CSG, 729, L-80, D = 12.347' 4110' Minimum ID = 3.813" @ 2010' 4-1/2" HES X NIPPLE -5/8' CSG, 47#, L-80 NSOC XO TO L-80 BTCAS17• TOP OF 7- LNR 9352' 9- 58 I' WHIPSTOCK(07/11/19) 9526' 9518' CSG, 47#, L�0 BTC ID = 8.681' ^•9526' TOP OF 4-12' LNR9683• 4-12' TBG, 12.6#, 13CR-85 VT, 9694' .0152 bpf, D = 3958' 7" LNR, 26#, L-80 VAMTOP HC, 9966• .0383 bpf, ID = 6276' PBTD 13607• 13CR-85 VT, .0152 bpf, ID = 3.958' 13697- : WELL TE L3 22A SAFETYMAXDL5:014.15@ 13508'. -CHROME TBG &LNR^' 1 2010' 1 14-12- HES X NIP, ID = 3.813' 5 PERFORATIDN SUMMARY 4018 REF LOG: WA MMG ANGLE AT TOP PERF: 107" @ 11150' Nola: Refer a Pmdu09on DB for Nsbrical rfdaa SIZE SPF MERVAL z SHOT SQ7 2-7/8" 6 11150 -11367 O 0725/19 2-7/8" 6 11397-11809 O 0725/19 2-7/8" 6 11839 -12251 O 0725/19 2-7/8" 6 12281 -12693 O 0725/19 2-7/8" 6 12723-13135 O 0725/19 2-7/8" 6 13165 -13577 C 0725/19 PBTD 13607• 13CR-85 VT, .0152 bpf, ID = 3.958' 13697- : WELL TE L3 22A SAFETYMAXDL5:014.15@ 13508'. -CHROME TBG &LNR^' 1 2010' 1 14-12- HES X NIP, ID = 3.813' 5 4113 4018 34 MMG DOME RK 5 6715 6119 39 MMG SO RK 4 8119 7225 35 MMG DMY RK 3 8818 7830 27 MMG DMY RK 2 9270 8242 22 MMG DMY RK 1 9352' 1 a-7M'X 7' WFD LTP WITIEBACK SLEEVE & HGR. ID =6.210' MLLOUT WINDOW (L3 -22A) 9526'-9540' 9547' H442' HES X NIP, ID = 3.813' 9575' 7'X4-12' HESTNTPKR, D=3.856' 9609' 4-12' HES X NIP, ID = 3.813' 9678' 4-12' HES X NIP, ID 33.813' 9683' 7'X 5' WFD LTP WITEBACK 08/08/19 JPK/JMD GLV C/O 08/02/19 SLEEVE & HGR, ID = 4.330' 9694' 4-12' WLEG, D = 3.958' 9704' S' X 4-12' XO. D = 3.910' DATE REV BY COMMENTS DATE REV BY COMMENTS 112N86 INITIAL COMPLETION 012620 KFWJMD SETCBP(0124/20 0727119 P-272 SIDETRACK L3 -22A 07/30/19 JMD DRLG HO CORRECTIONS 08/08/19 JPK/JMD GLV C/O 08/02/19 0820/19 JNL/JMD ADDED REF & BF ELEVS 0820/19 JT/JMD FINAL ODE APPROVAL 16 06/02119 20 08/02/19 0 0726119 0 0726119 0 0726119 LISBURNE UNIT WELL: L3 -22A PERMIT No: 219-051 API No: 50-029-21663-01 BP Expbration(Aaska) Originated: Schlumberger PTS - PRINT CENTER 6411 A Street Anchorage, AK 99518 (907) 273-1700 main (907)273-4760 fax Delivered to: 4 s� AOGCC v \ ATTN: Natural Resources Technician II Alaska Oil & Gas Conservation Commision 333 W, 7th Ave, Suite 100 Anchorage, AK 99501 219051 TRANSMITTAL DATE TRANSMITTAL #® Schlumberger -Private C 0 s M t0 N 4) N O h a z EL O N N r N m m E 0 U z°1 0 a 7 m Eof m m m m m m m is m = U m U m m J m 6 m a 6 E ❑ Q Q Q ❑ E ❑ ❑ ❑ ❑ ❑ Q 0 m "rn JO m 'rn m "rn (n U E O 0 J om 'C OI 'C (n D7 0 m 'E m LL C Q C ❑ E O > 0 0 ❑ O ad o s Z. 0 0 0 J 0 0 0 =2C' ❑ O ❑ O m N m N rn N ❑ O Q o @ m@ m0° 1 E B m O W Q 2 E m E O i ❑ rn9 ❑ Q O N N 10 �O N O N ❑` N_ N ~ N N U Y M J Y (h J Y Cj J Y C1 J Y M E J ry M J� M J❑ M J Y M J Y M J Y N 0 N LL N J N J N J =y m« om ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ E'c2 �M w w 0(9 0� o� of vyI o(w9 0W UII m c2 2 c2 E 2 rn = o cS E 2 of Q � UI c'w 2 00 c2 o "m o Ti- _ 2 ) ca1 t) U Co a m — a m 1 9 a m u 1 a m 1 4 a t dl u m `o t E m u a m t 1 4 a m t a O m y y 0 N J y N O O N E _N W N N _N O J N W N❑ JN w w w N J W W W co) W N w N w N v m m m m m rn rn m m m a j N 0 0 0 0 0 0 0 0 o O � N N N N N N N N N N N O Q V V V O V O V V V V xx OU n o N d y N (n m 7 mm S2 m m m m m m m is „ m m m m m m m m m m m E ❑ Q Q Q ❑ ❑ ❑ ❑ ❑ ❑ ❑ z a m "rn m 'm m 'rn m "rn m "rn m 'm 'om m om w m w 0 0 0 0 0 0 0 0 0 0 0 ad o s 0 0 0 0 0 0 0 0 0 0 m U A E N m N m N m N m N m N rn N m N w N m m N N = d jp O W Q 2 E m E O i rn9 Q rn f U U U U U U U U U U U J =y m« om ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 3 �M w w w w w w w w w w w 7 c E E O U 0 O O CD0 g^, M O O D > a O J 'O z 2 Z Q } } } m U ❑ N N N a O O F p, C_ c C J Ln >. E O W W W J m C Z J C7 �' U' U' C7 O Q n n p O L L a o m0 mi mi mi }¢ U a m `p Q 1 m w 0 FN Z` N O N N N N N N O m U U J J Y J d J J J = a �� = a a CL W ll. ❑ lL 11 LL x C �� N n ,c .c x o K c omo c alo c a o o Em } Din A l Q ny Q pj O N N J E a K a K a K W U m W N W W W W N= cl LL «p dU W a v v e v0 2 ❑ d �y 10 oa LL n i1 E W W m m v a � 1 m J O a > m 0 n E E V Z U m a N a O O m QO J ro m 9 E CL O c d � U U C 0 O o H CON a n OD N C) o E U Q Z C O Q a Q M J o - O F- La o E V C N � c Q N a a ❑ d E M W m r = o E W_ O a A c N a Qa O U m a a o WE 0m 0 T Q 2 m O U ` N O O N N�N U 2 U m m m m m y rn w a 3 m m ❑ m O m O m ❑ a M❑ A YO N <0 S c O o N m om om m om o m r v O ❑ o 0 0 0 o J E C v c >0 mi m m m m O N f N N N N W E Q 0 O N W - n aO n S N W m h m Z p K a '� ~ m 0 ❑ a O O m y H Q c p o Z Q c o m p U U U U U c �, .0 E O O E a o CL i Ea ❑ ❑ ❑ ❑ ❑ ❑ m — LL o a 6 W W W W W J 3 Z— U a U U U of c E E O U r O 0 - LU iWLr- LU U Z Q J 0 - mo O" O UN O J `Q 1CC /C W V! Q a 5 19 I L 0 m 4 U U O I BA_ ICER 0 PRINT DISTRIBUTION LIST 21 9051 3120 Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, LR2-1 I E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU STK:Imag a Log LOG DATE July 23, 2019 TODAYS DATE October 2, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: -- COMPANY ADDRESS (FEDEX WILL NOT DELP/M TO P.O. BOX) PERSON ATTENTION IG t BP North Slope. EOA, PBOC, PRB-20 (Office 109) i D&C Wells Project Aides i Attn: Benda Glessmaker & Peggy O'Neil 900 E. Benson Blvd. ;Anchorage, Alaska 99508 2 iConc coPhillips Alaska Inc. :Attn: Ricky Elgarico G Street 3 EXXonMohiL Alaska Arm: Lynda M. V askell and/ar Lisa Boggs 3201 C Street. Suite 505 Anchorage. AK 99503 State of Alaska -AOUCC Attn: Natural Resources Technittan 333 W. 7th Ave, Suite 100 Anchorage. Alaska 99501 DNR- Division of Otl & Cas —' Attn: Rersourve Evaluation Section 550 West 7th Avenue, Suite 1100 .Anchorage, Alaska 99501 •a* Stamn "confidential" on all material deliver, BP Exploration (Alaska) Inc. Petmtechnical Data Center. LR2-1 900 F. Benson Blvd. Anchorage, Alaska 99508 Attn: Nancy Landi FIELD/ %J F -I a GE company CDjDVD COMPANY BP Exploration Alaska Inc. WELL NAME L3 -22A (las, tllis, PDF, META, FIELD Lisburne COUNTY PRUDHOE BAY # OF PRINTS BHI DISTRICT Alaska # OF COPIES #OFC PIES AUTHORIZED BY Paul Canizares EMAIL Paul. Canizares@bhoe.com 21 9051 3120 Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, LR2-1 I E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU STK:Imag a Log LOG DATE July 23, 2019 TODAYS DATE October 2, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: -- COMPANY ADDRESS (FEDEX WILL NOT DELP/M TO P.O. BOX) PERSON ATTENTION IG t BP North Slope. EOA, PBOC, PRB-20 (Office 109) i D&C Wells Project Aides i Attn: Benda Glessmaker & Peggy O'Neil 900 E. Benson Blvd. ;Anchorage, Alaska 99508 2 iConc coPhillips Alaska Inc. :Attn: Ricky Elgarico G Street 3 EXXonMohiL Alaska Arm: Lynda M. V askell and/ar Lisa Boggs 3201 C Street. Suite 505 Anchorage. AK 99503 State of Alaska -AOUCC Attn: Natural Resources Technittan 333 W. 7th Ave, Suite 100 Anchorage. Alaska 99501 DNR- Division of Otl & Cas —' Attn: Rersourve Evaluation Section 550 West 7th Avenue, Suite 1100 .Anchorage, Alaska 99501 •a* Stamn "confidential" on all material deliver, BP Exploration (Alaska) Inc. Petmtechnical Data Center. LR2-1 900 F. Benson Blvd. Anchorage, Alaska 99508 Attn: Nancy Landi FIELD/ FINAL CDjDVD FINAL PRELIM LOGS I (las, tllis, PDF, META, SURVEY REPORT LOGS CGM, Final Surve ) (Compass) # OF PRINTS # OF COPIES # OF COPIES #OFC PIES 1 TOTALS FOR THIS PAGE: 0 0 4 0 0 STATE OF ALASKA "SKA OIL AND GAS CONSERVATION COMMIS V WELL _JMPLETION OR RECOMPLETION REPO.,. AND LOG a 1a. Well Status: Oil IZ ' Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspentletl 111b. well class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development RI -Exploratory ❑ Service ❑ Stmtigraphic Test ❑ 2. Operator Name: 6, Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 7/27/2019 219-051 3. Address: 7. Date Spudded: t5' API Number: P.O. Box 196612 Anchorage, AK 99519-6612 7/11/2019 60-029-21663-01-00 ' 4a. Location of Well (Governmental Section): 8. Date TO Reached. 16. Well Name and Number: 7/22/2019 PBU 1-3.22A - Surfare: 812' FNL, 833' FWL, Sec. 22, T1 IN, R15E, UM' 9 Ref Elevations KB 68 31 17_ Field/Pool(s): Top of Productive Interval: 1442' FNL, 4454' FWL, Sec. 22, T11 N, R15E, UM GL 21.76 • BF 23 44 PRUDHOE BAY, LISBURNE OIL - 10. Plug Back Depth(MD/TVD): 18. Property Designation. Total Depth: 439 FNL, 2468' FWL, Sec, 23, T1 IN, R15E, UM 13607'/ 8839' ADL 028322 & 028323 4b. 41b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 708096 - y- 5981492- Zone - ASP 4 - 13699'/ 8837' - 84-62 TPI: x- 711734 y- 5960963 Zone- ASP 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MDA -VD: Total Depth: x- 714997 y- 5962061 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes ® (attached) No ❑ 13. Water Depth, if Offshore' 21. Re-drill/Lateral Top Wlndaw MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9526'/ 8481' 22_ Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MAD /GR/RES / DEN /NEU, MWD /GR/RES / DEN /NEU 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTINGDEPTHMD SETTINGDEPTHTVD HOLE SIZEAMOUNT CEMENTING RECORD PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 47' 127' 47' 127' 30" 1725# Poll 13-3/8" 68#/72# K-5&L-eo 47' 4118' 47' 4022' 17-1/2" 2350 sx AS III, 600 sx Class'G", 150 sx AS 1 9-5/8" 47# L-80 45' 9526' 45' 8481' 12-1/4" 790 sx Claes'G', 300 sx AS I, 175 sx Class'G' 7" 26# L-80 9352' 9966' 8318' 8858' 8-1/2" 188 sx Class'G' 4-1/2" 12.6# 13cre5 9683' 13697' 8624' 8837' 6-1/8" 241 sx BiModal 24. Open to production or injection? Yes IZ - No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 1 2-7/8" Gun Diameter, 6 sot T 1t5_10 ? ' GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12,6# 13Cr85 9694' 9575' / 8527' 11150'-11367' 8930'-8894' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11397'- 11809' 8894'- 8890' Was hydraulic fracturing used during completion? Yes ❑ No m Per 20 AAC 25.283 (i)(2) attach electronic and printed 11839'- 12251' 8889'- 8875' 12281'- 12693' 8874'- 8861' COMPLETION 12723'- 13135' 8859 - 8844'D E 13165'- 13577' 8844'- 8840' /I1 20(9 -( information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED VE. FIE 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas lift, elc.): N/A Date of Test::: Hours Tested:: Production for OiL Gas-MCF: GMCF: Water -B01: Choke Sive Gas -Oil Ratio Test Penod —y Flow Tubing Press Casing Press: Calculated 24 Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity- API(com: Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only /jy RBDMS AUG 2 6 2019 p /t �P� 28. CORE DATA Conventional Core(s) Yes ❑ No 0 . I Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this forth, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost - Base If yes, list intervals and formations tested briefly summarizing test results. Attach Top of Productive Interval 9966' 8858, separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Kavik 9763' 8693' Lisburne - Wahoo 7 9966' 8858' Wahoo 6 10078' 8943' Wahoo 5 10308' 9070' Wahoo 6 (Invert) 10805' 9057' Wahoo7 11146' 8932' Formation at total depth: Wahoo 7 (From Base) 11146' 8932' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Survey, Cement Reports, Wellbore Schematic Diagram Information to be attached includes. but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Thompson, Jacob Authorized Title: ecialis Contact Email: Jacob.Thompson c@BP.com Authorized Signature: Date: 2%-� Contact Phone: +1 907 564 5579 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item lb. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only TREE= CNV WELLHEAD= MCEVOY ACTUATOR= BAKER KB. ELEV = 60' REF ELEV = 68.31' BF. ELEV = 23.44' KOP = 3100' Max A le= 113' 0 11014' Datum MD = 10116' Datum TVD= 8900'SS I 133/6' CSG, 68#, rE7O' K-55 BTC, IO=12A15' / 13-3/8' CSG, 72#, L-80, D = 12.347' 411W Minimum ID = 3.813" @ 2010' 41/2" HES X NIPPLE -5/8" CSG. 47#. L-80 NSCC XO TO L-80 BTC 461 198/8" CSG.47#. L-80 BTC. D = 8.681' I .0152 7" LNR, 26#, L-80 VAMTOP HC, 9999' .0383 bpf, ID = 6276" L3 -22A —PB To UNP 12.6#, 13CR35 VT, .0152 bpf, ID = 3.958" 14-12' HES X NP. ID = 3.813' 1 GAS LFT MANDRELS iT MD PERFORATION SUMMARY I DEV I TWE MAN I REF LOG: NIA ILATrHIPORTI ANGLE AT TOP PERF: 107'@ 11150' Note: Refer ID Pmdmfion DB fpr Nstoriml perfdata SIZE SPF 14TERVAL OprdSqz SHOT SOZ 2-71W 6 11150-11367 O 6119 39 2-718' 6 11397 -11809 O 08/02/19 4 2-71W 6 11839-12251 O DMY RK 2-7/8' 6 12281 -12693 O 107)25119 27 2-71W 6 12723 -13135 O 0726/19 2 2-71W 6 13165-13577 O RK —PB To UNP 12.6#, 13CR35 VT, .0152 bpf, ID = 3.958" 14-12' HES X NP. ID = 3.813' 1 GAS LFT MANDRELS iT MD I TVD I DEV I TWE MAN I VLV ILATrHIPORTI DATE 6 41134018 34 MMG DOME RK 16 08/D2H9 5 6715 6119 39 MMG SO RK 20 08/02/19 4 8119 7225 35 MMG DMY RK 0 0726/19 3 8818 7830 27 MMG DMY RK 0 0726/19 2 9270 8242 22 MMG DMY RK 0 0726/19 SSW X 7" WFD LTP W/ TIEBACK SLEEVE & HGR, ID = 6.210' MILLOUT WINDOW (L3 -22A) 9528'-9540' I 954T I ITX4-12'HESTNTPKR.D=3.856" I 14-12"HESXNIP.ID=3.813' I 14-12' HES X NP. ID =3.813" 1 X 5" WFD LIP W/TIEBACK 15"X 441T X0. ID=3.919' I DATE REV BY COMMENTS DATE REV BY COMMENTS 1124186 INITIAL COMPLETION 07127119 P-272 SIDETRACK (L3 22A) 07rMI9 JMD DRLG HO CORRECTIONS 08/08/19 JPK/JMD GLV C/O(OaMM9 0820(19 JNUJMD ADDED REF & BF ELEVS 0820119 JT/JMD FINAL ODE APPROVAL SP Explomtion (Alaska) Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: 1-3-22A Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (pp) (psi) (BHP) (psi) (ppg) 07/12/19 FIT 9,526.00 8,481.40 9.90 690.00 5,051.86 11.47 07/16/19 FIT 9,966.00 8,858.07 8.50 605.00 4,516.33 9.81 Page 1 of 1 North America - ALASKA - BP Operation Summary Report Page 1 of 24 Common Well Name: L3-22 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 70/2019 End Date: 7/23/2019 X3-019CC-C: (5,907,796,00) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud DateTme: 11/4/1986 12:00 OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUO1: USA00001272 Active datum: ACTUAL KB P272 (§68.31 usR (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 70/2019 17:30 - 19:30 2.00 MOB P -1.02 PRE RIG DOWN OFF OF PWDW3-2 AND STAGE MODULE FOR MOVE TO L3 -22A -COMPLETE PRE MOVE INSPECTIONS - SPLIT MODULES AND STAGE FOR MOVE AT •PAD ENTRANCE - REMOVE DUMMY WELL HOUSE AND RE -INSTALL GAUGES ON WELLHEAD 19:30 - 23.00 3.50 MOB P -1.02 I PRE MOVE RIG MODULE FROM FLOW 3 ALONG OXBOW ROAD TO INTERSECTION WITH WEST DOCK ROAD. 23:00 - 00:00 1.00 MOB P -1.02 PRE CONTINUE MOVING RIG MODULES ALONG WEST DOCK ROAD 7/8/2019 00:00 - 01:30 1.50 MOB P -1.02 PRE MOVE RIGALONG EAST DOCK ROAD TO ,TARMAC CAMP 01:30 - 06:00 4.50 MOB P -1.02 PRE MOVE RIG ALONG EAST DOCK ROAD FROM TARMAC CAMP TO L3 ACCESS ROAD AND ON TO L3. RIG ON LOCATION AT O6: OO HRS 06:00 - 09:30 3.50 MOB P -1.02 PRE SET DUMMY WELL HOUSE AND SPOT DRILL MODULE OVER 113-22 MATE UTILITY MODULE AND MUD MODULE TO DRILL MODULE INSTALL ROOF COVERS, TRANSITIONS AND FLOOR PLATES MAKE UP ELECTRICAL CONNECTIONS IN INNER -CONNECTS 09:30 - 10:00 0.50 MOB P -1.02 PRE RAISE MAST OFF DERRICK WITH 525 KLBS OFF THE RACK 10:00 - 1100 1.00 MOB P -1.02 PRE SKID RIG FLOOR TO DRILL POSITION SKID HAUNCH INTO POSITION RAISE PIPE CAT INSTALL FLOW LINE 11:00 - 1200 1.00 MOB P -1.02 PRE SPOT CUTTINGS BOX MAKE UP LINES IN INNER -CONNECTS _ ACCEPT RIG AT 1200 HRS. 12:00 - 17:30 5.50 WHSUR P -1.02 PRE NIPPLE DOWN TREE PER CAMERON REP -BLEED OFF CONTROL LINE AND REMOVE CAP -BEGIN MONITORING WELL THROUGH IA -SUCK OUT TREE - NIPPLE DOWN TREE FUNCTION AND MEASURE LOCK DOWN SCREWS - VERIFY HANGER THREADS 2-7/8" EUE AND INSTALL HP BPV - 9-1/4 TURNS FOR XO, 6 TURNS FOR HP LUG, 7-1/4 TURNS (1" GAP) FOR DART SIMOPS: - RIG UP HARDLINE FROM IA - COMPLETE RIGGING UP RIG FLOOR EQUIPMENT - INSTALL OFF-LINE MOUSEHOLES - CALIBRATE PITS AND GAS WATCH Printed 8/52019 12:08:03PM ••All depths reported in Drillers Depths" Common Well Name: L3-22 Event Type: RE-ENTER- ONSHORE (RON) Protect: Lisburne North America - ALASKA - BP Page 2 of 24 Operation Summary Report Start Date: 7/7/2019 End Date. 7/23/2019 Site: L3 AFE No (5,907,796.00 ) Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00,00AM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. SIMOPS: BPUOI: USA00001272 Active datum'. ACTUAL KB P272 @88.31 usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations . (hr) (usft) _ 17:30 - 20:30 3.00 BOPSUR P -1.02 PRE NIPPLE UP DSA, HIGH PRESSURE RISERS AND BOP STACK - NIPPLE UP STACK AND TORQUE ALL BOLTS -CONNECT FLOW LINE, DRAINS AND FILL UP LINE -OBTAIN RKB MEASUREMENT - INSTALL MOUSEHOLE 20:30 - 22:30 2.00 BOPSUR P -1.02 PRE CHANGE UPPER AND LOWER PIPE RAMS TO 2-7/8" x 5" VBR -OPEN DOORS AND INSPECT CAVITIES - INSTALL 2-7/8" x 5" VBR IN UPPER AND LOWER RAMS SIMOPS: CHANGE SAVER SUB FROM NC5_0 _T_O_HT38 _ 22:30 - 23:30 1.00 BOPSUR P -1.02 PRE RIG UP TO TEST BOPE - PURGE AIR FROM STACK AND LINES - MAKE UP TEST JOINTS AND TEST _ _ MANIFOLDS 23:30 - 00:00 0.50 BOPSUR P -1.02 PRE TEST BOPE - TEST FIRE AND GAS ALARMS 7/9/2019 00:00 - 05:00 5.00 BOPSUR P -1.02 PRE TEST BOPE PER AOGCC AND BP -TEST RAMS AND ANNULAR WITH 2-7/8" AND 4" TESTJOINTS -TEST UPPER AND LOWER 2-7/8"it 5" VBR WITH 250/5000 PSI FOR 5 CHARTED MIN - TESTANNULAR 70250/3500 PSI ! - TEST BLIND SHEARS AND CHOKE MANIFOLD VALVES 250/5000 PSI - TEST FIRE AND GAS ALARMS - PERFORM ACCUMULATOR DRAW -DOWN TEST AND FUNCTION HIGH/LOW BYPASS -PERFORM BLACKOUT TEST TEST WITNESS WAIVED BY AOGCC REP BOB NOBLE Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" SIMOPS: -LOAD 41/2" VAM TOP TUBING IN PIPE SHED _ AND PREP FOR INSPECTION _ 05:00 - 05:30 0.50 BOPSUR P -1.02 PRE RIG DOWN AND BLOW DOWN BOP TEST _ EQUIPMENT 0530 - 0700 1.50 WHSUR P -1.02 PRE PULL TEST DART AND HP BPV FROM WELL PER CAMERON WELLHEAD REP - MAKE UP T -BAR AND ATTEMPT TO PULL TEST DART: UNABLE TO GET ON DART WITH BEND IN T -BAR - PUMP OUT STACK - ENGAGE AND PULL TEST DART WITH T -BAR - ENGAGE AND PULL HP BPV FROM WELLHEAD - RIG DOWN T -BAR 07:00 - 07:30 0.50 WHSUR P -1.02 DECOMP RIG EVACUATION/ H2S DRILL AND AAR WITH RIG CREW WBS: DECOMP Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 3 of 24 Common Well Name: L3-22 - PUMP 20 BBLS DOWN THE TUBING TAKING AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 7/7/2019 End Date'. 7/23/2019 X3-019CC-C'. (5.907 796 00 ) Project: Lisburne Site: L3 - PUMP 40 BBLS DOWN THE IA TAKING Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00.00AM RETURNS UP THE TUBING TO THE OPEN TOP Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. TANK: 4 BPM SPUD]: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) ----MONITOR Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (h[) _ _ (usft)_ 07:30 - 09:00 1.50 WHSUR P -1.02 DECOMP RIG UP AND CIRCULATE OUT TOP OF WELL Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths** - PUMP 20 BBLS DOWN THE TUBING TAKING RETURNS FROM THE IA TO THE OPEN TOP TANK: 4 BPM, 1190 PSI - PUMP 40 BBLS DOWN THE IA TAKING RETURNS UP THE TUBING TO THE OPEN TOP TANK: 4 BPM -8.3 PPG IN/OUT ----MONITOR WELL FOR 10 MIN: STATIC 09:00 - 11:00 2.00 WHSUR P -1.02 DECOMP PULL TUBING HANGER TO FLOOR AND LAY DOWN -MAKEUP LANDING JOINT AND XO ,-ENGAGE HANGER WITH 8 TURNS - BACK OUT LOCK DOWN SCREWS '- PULL HANGER TO RIG FLOOR 80 KLBS TO COME OFF SEAT - PU 86 KLBS, SO 86 KLBS '- RIG DOWN LANDING JOINT - RIG UP TO PULL AND LAY DOWN 2-7/8" TUBING WITH CONTROL LINE 'SIMOPS: - RIG UP OA TO TIGER TANK AND BEGIN MONITORING FOR PACK -OFF CHANGE OUT 11:00 - 21:00 10.00 CASING P -1.02 DECOMP PULLAND LAY DOWN 2-7/8" TUBING WITH CONTROL LINEAND CHEMICAL INJECTION LINE FROM 9575' MD (9564'+ 10.57' RKR DIFFERENCE) -PRE-RIG JET CUTWASA PARTIALCUT - RECOVERED: 296 FULL JOINTS OF 2-7/8" TUBING, 5 GLM'S, 1 CHEMICAL INJECTION MANDREL, 2 FLOW COUPLINGS, 75 SS BANDS 21:00 - 21:30 0.50 CASING P -1.02 DECOMP _ RIG DOWN 2-7/8" HANDLING EQUIPMENT SIMOPS: - DRAIN STACKAND LAY DOWN MOUSEHOLE 21:30 - 23:30 2.00 BOPSUR P -1.02 DECOMP NIPPLE DOWN BOP STACKAND HIGH PRESSURE RISERS FOR TUBING SPOOLAND PACK -OFF CHANGE OUT -NIPPLE DOWN BOP STACKAND SECURE ON STUMP - PULL HIGH PRESSURE RISER AND DSA SIMOPS: - BUILD STANDS OF4" DRILL PIPE UTILIZING _ OFF-LINE STAND _BUILDING EQUIPMENT 23.30 - 0000 0.50 WHSUR P -1.02 DECOMP NIPPLE DOWN 13-3/8" x 11" TUBING SPOOL - FUNCTION LOCK DOWN SCREWS AND _ _CONFIRM NO CASING GROWTH _ 7/10/2019 00:00 - 01:00 1.00 WHSUR P -1.02 DECOMP CONTINUE TO NIPPLE DOWN 13-3/8" x 11" TUBING SPOOL PER CAMERON WELLHEAD REP -CLEAN AND INKCT PACK -OFF - BACK OUT LOCK DOWN SCREWS SIMOPS: - BUILD STANDS OF 4" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 4 of 24 Common Well Name: 13-22 - 06:00 3.00 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 7!7/2019 End Date: 7/23/2019 X3-019CC-C: (5,907,796.00 ) Project Lisburne Site: L3 P 1 -1.02 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00 OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. - PULL 9-5/8" CASING PACK -OFF WITH BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) '- CLEAN AND INSPECT WELLHEAD Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) INSTALL NEW 9-5/8" CASING PACK-OFFAND 01:00 - 02:30 1.50 WHSUR N -1.02 DECOMP WAIT FOR CAMERON WELLHEAD REP TO 02:30 - 03:00 0.50 WHSUR P -1.02 03:00 - 06:00 3.00 WHSUR P -1.02 06:00 - 07:00 1.00 WHSUR P 1 -1.02 07:00 - 0900 2.00 BOPSUR P -1.02 09'.00 - 1000 1.00 BOPSUR P -1.02 10.00 - 11'.00 1.00 WHSUR P -1.02 LOCATE AND GET TOOLS TO PULL 9-5/8" CASING PACK -OFF - PACK -OFF IN WELL IS THREADED AND DOES NOT HAVE THE "J" SLOTS FOR RUNNING/RETRIEVING - CAMERON HAND WENT TO TOOL SERVICE WAREHOUSE TO RETRIEVE THREADED PACK -OFF PULLING TOOL Printed 8/5/2019 12.05 03PM '•AII depths reported in Drillers Depths" SIMOPS: - BUILD STANDS OF 4" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT - LOAD PIPE SHED WITH REMAINDER OF -4-1/2" TUBING - NORM 2-7/8" TUBING AND JEWELRY DECOMP PULL 9-5/8" CASING PACK -OFF '- MAKE UP THREADED PULLING TOOL - PULL 9-5/8" CASING PACK -OFF WITH TUGGER '- CLEAN AND INSPECT WELLHEAD SIMOPS: -BUILD STANDS OF 4" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT DECOMP INSTALL NEW 9-5/8" CASING PACK-OFFAND NIPPLE UP NEW 13-3/8" TUBING SPOOL PER CAMERON WELLHEAD REP - INSTALL SECONDARY ANNULUS VALVES SIMOPS: -BUILD STANDS OF 4" DRILL PIPE UTILIZING _OFF-LINE STAND BUILDING EQUIPMENT DECOMP PRESSURE TEST HANGER SEALS 7O 3500 PSI FOR 15 CHARTED MIN - GOOD TEST: MET TEST CRITERIA PER BP PRACTICE 100218 TABLE 2 TYPE 3A -TESTAPPROVED BY BP WSUP -SEE ATTACHED DECOMP NIPPLE UP HIGH PRESSURE RISER AND BOP STACK - TORQUE ALL BOLTS TO SPEC - INSTALL TURNBUCKLES AND FILL UP / CIRCULATING LINES -INSTALL FLOW BOXAND LOW PRESSURE RISER -AIR UPALLAIR BOOTS -OBTAIN NEW RKB MEASUREMENT SIMOPS: - BUILD STANDS OF 4" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT DECOMP INSTALL TEST PLUG AND PRESSURE TEST BREAKS TO 250/3500 PSI FOR 5 MIN - INSTALLTEST PLUG AND FILL STACK - PURGE LINES AND TEST BREAKS: GOOD TEST DECOMP PULL TEST PLUG AND INSTALL 9.125" IS WEAR RING -LAY DOWN RUNNING TOOL Printed 8/5/2019 12.05 03PM '•AII depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: 13-22 Event Type. RE-ENTER- ONSHORE(RON) Start Date. 7(72019 Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Daterrime: 11/ Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Hm Task Code _ (hr) 11:00 - 17:00 6.00 STWHIP P 17:00 - 22:30 5.50 STWHIP P 22:30 - 00:00 1.50 STWHIP P — i 7/11/2019 00:00 - 02:00 2.00 STWHIP P Page 5 of 24 APE No End Date: 7/23/2019 X3-019CC-C:(5,907,796.00) NPT Total Depth (usn) 9,57298 9,572.98 Rig Release: 7/27/2019 Phase Description of Operations WEXIT MAKE UP MILLING ASSEMBLY AND 9-5/8" WHIPSTOCK PER SLB FISHING REPAND BAKER MWD - MOBILIZE BHA COMPONENTS TO RIG FLOOR - MAKE UP TRI -MILL, FLOATAND MWD TOOS AND SCRIBE '- SHALLOW HOLE TEST MWD: GOOD - PICK UP AND MAKE UP WHIPSTOCK TO TRI -MILL - MAKE UP AND RUN IN THE HOLE WITH THE REMAINDER OF THE MILLING ASSEMBLY: FILTER SUB, (9) 6-1/2" DRILL COLLARS AND (21) JTS OF 5" HWDP WBS: WEXIT WEXIT RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK AND WINDOW MILLING ASSEMBLY FROM 1046' MD TO 4828' MD, PICKING UP 4" DRILL PIPE FROM THE PIPE SHED. - RUN IN THE HOLE AT 45 FT/MIN PER SLB FISHING REP - PU 140 KLBS, SO 126 KLBS AT 4828' MD - MUD WEIGHT IN/OUT = 8.3 PPG MONITOR WELL WITH TRIP TANKAND HOLE _ FILL: GOOD DISPLACEMENT 9,572.98 WEXIT CONTINUE TO RUN IN THE HOLE WITH 9-5/8" WHIPSTOCKAND WINDOW MILLING ASSEMBLY FROM 4828' MD TO 6255' MD, ON STANDS 4" DRILL PIPE FROM THE DERRICK. - RUN IN THE HOLE AT 45 FT/MIN PER SLB FISHING REP - FILL PIPE EVERY 2000' - PU 157 KLBS, SO 133 KLBS AT 6030' MD - MUD WEIGHT IN/OUT = 8.3 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT 9,572.98 WEXIT CONTINUE TO RUN IN THE HOLE WITH 9-5/8" WHIPSTOCKAND WINDOW MILLING ASSEMBLY FROM 6255' MD TO 9477' MD, ON STANDS 4" DRILL PIPE FROM THE DERRICK. - RUN IN THE HOLE AT 45 FT/MIN PER SLB FISHING REP - FILL PIPE EVERY 2800' - PU 225 KLBS, SO 165 KLBS AT 9477' MO - MUD WEIGHT IN/OUT = 8.3 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name L3-22 Event Type. RE-ENTER- ONSHORE (RON) Start Date. 7/7/2019 End Date. 7/23/2019 Project. Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00:00AM Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase (-hr). _ (usft) - 02:00 03:30 1.50 STWHIP P 9,572.98 WEXIT Page 6 of 24 AFE No X3-019CC-C: (5,907,796.00 ) Rig Release: 7/272019 Description of Operations ORIENT AND SET SLB WHIPSTOCK - MAKE UP TOP DRIVE AND BREAK CIRCULATION: 120 GPM, 2280 PSI - ORIENT WHIPSTOCK WITH MWD: 10' ROHS AS PER BAKER MWD/DD .— — RUN IN THE HOLE AND TAG AT 9559' MD WITH 3-4 KLBS - TAGGED 15' HIGHER THAN EXPECTED - PICKED UP TO 9553' MD AND SLACKED OFF AND TOOK KLBS. - PICKED UP TO 9551' SLACKED OFF, BEGAN TAKING WEIGHT IMMEDIATELY. TOP OF WINDOW 9526' MD, 8481' TVD BOTTOM OF WINDOW 9540' MD, 8495' TVD SIMOPS: - LOAD PIPE SHED WITH 7" LINER AND INSPECT. - LOAD PIPE SHED WITH REMAINDER OF 4-1/2" TUBINGAND LINER AND INSPECT - RIG UP CONTINGENCY TANKS AND LINE _ FROM TANKS TO PUMP AND TO RIG. 20:00 - 21:00 1.00 STWHIP P 9,556.00 WEXIT CIRCULATE A HIGH VIS SWEEP AND CLEAN UP HOLE - 650 GPM, 3700 PSI - RECIPROCATE PIPE 15' AT SURFACE, NO ROTATION Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths** STOPPED AND DISCUSSED WITH ODE, WSUP AND ETL. 03:30 - 05:00 1.50 STWHIP P 9,556.00 WEXIT . DISPLACE WELL FROM 8.3 PPG FRESHWATER TO 9.9 PPG -SND MILLING FLUID WHILE DISCUSSING WHIPSTOCK SETTING DEPTH WITH ANCHORAGE TEAM. -600 GPM, ICP 2895 PSI 05:00 - 05:30 0.50 STWHIP P 9,556.00 WEX�T SET 1GF0ocmry nTn •n (enrrnn� WHIPSTOCK ANCHOR) PER SLB FISHING REP , - SET DOWN AND OBSERVE SHEAR AT 45 _ KLBS 05:30 - 20:00 14.50 STWHIP P 9,556.00 WEXIT MILL WINDOW IN 9-5/8"CASING AND-16'OF NEW FORMATION FROM 9526' MD TO 9556' MD, 8509' TVD - 400-265 GPM, 1800-1180 PSI, 130 RPM, 12-16 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM, 5-17 KLBS WOB - PU 203 KLBS, SO 165 KLBS, ROT 182 KLBS AT 9526' MD - WORK MILLS THROUGH WINDOW 80 RPM - 2 KFT-LBS INCREASE IN TORQUE EACH TIME WITH PUMPS ON - WORK MILLS THROUGH WINDOW WITH NO PUMPS / NO ROTATION: -3-5 K FT -LBS INCREASE IN DRAG AS UPPER MILL WENT THROUGH WINDOW TOP OF WINDOW 9526' MD, 8481' TVD BOTTOM OF WINDOW 9540' MD, 8495' TVD SIMOPS: - LOAD PIPE SHED WITH 7" LINER AND INSPECT. - LOAD PIPE SHED WITH REMAINDER OF 4-1/2" TUBINGAND LINER AND INSPECT - RIG UP CONTINGENCY TANKS AND LINE _ FROM TANKS TO PUMP AND TO RIG. 20:00 - 21:00 1.00 STWHIP P 9,556.00 WEXIT CIRCULATE A HIGH VIS SWEEP AND CLEAN UP HOLE - 650 GPM, 3700 PSI - RECIPROCATE PIPE 15' AT SURFACE, NO ROTATION Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths** Common Well Name: L3-22 Event Type. RE-ENTER- ONSHORE (RON) Proiect: Lisburne North America - ALASKA - BP Operation Summary Report Start Date. 7/7/2019 End Date'. 7/23/2019 Site: L3 Spud DatefTime: 11/4/1986 12.00.00AM AFE No X3-019CC-C. (5,907,796.00 ) Rig Release: 7/27/2019 Page 7 of 24 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 STWHIP P 8,555.00 WEXIT PULL OUT OF THE HOLE ON ELEVATORS WITH 8-1/2" TRI -MILL ASSEMBLY FROM 9556' MD TO 1780' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC - PU 97 KLBS, SO 97 KLBS AT 1880' MD - MUD WEIGHT IN/OUT = 9.9 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD FILL STRAP DRILL_ STRING_ ON TRIP OUT_ _ __ 7/12/2019 00:00 - 00:30 0.50 STWHIP P 9,555.00 WEXIT CONTINUE TO PULLOUT OF THE HOLE ON ELEVATORS WITH 8-1/2" TRI-MILLASSEMBLY FROM 1780' MD TO 1056' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC - PU 90 KLBS, SO 90 KLBS AT 1056' MD - MUD WEIGHT IN/OUT = 9.9 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD FILL - STRAP DRILL STRING ON TRIP OUT - MONITOR THE WELL FOR 10 MIN PRIOR TO 'PULLING NON-SHEARABLES THROUGHT THE _ STACK: STATIC 00:30 - 03:00 2.50 STWHIP P 9,555.00 WEXIT PULLAND LAY DOWN TRI -MILL ASSEMBLY - RACK BACK 5" HWDP IN THE DERRICK -LAY DOWN 6-1/4" DRILL COLLARS, MWD AND MILLS -PILOT MILL: 1/2" UNDER GAUGE - LEAD MIL: 12" UNDER GAUGE - WATERMELON MILL: 3/16" UNDERGAUGE _STRAP OUT MATCHED -TALLY RUNNING IN 03:00 - 03:30 0.50 STWHIP P 9,555.00 WEXIT CLEAN AND CLEAR RIG FLOOR - FUNCTION BOP COMPONENTS AND FLUSH STACK - BLOW DOWN CHOKE AND KILL LINES - OPEN MANUAL VALVES ON STACK 03:30 - 07:30 4.00 DRILL P 9,555.00 WEXIT PICK UP AND MAKE UP BHA#2, 8-1/2" MOTOR ASSEMBLY PER BAKER MWD/DD - MAKE UP 1.7° AKO MOTOR AND MWD TOOLS - PLUG IN AND VERIFY MWD TOOLS - RUN IN AND SHALLOW HOLE TEST MWD - MAKE UP 8-12" HUGHES KYMERA BIT - PICK UP NON -MAG COLLARS - INSTALL SOURCES IN LOGGING TOOLS _ - PU 80 KLBS, SO 80 KLBS AT 930' MD 07:30 - 11:30 4.00 DRILL P 9,555.00 WEXIT RUN IN THE HOLE WITH BHA#2 ON ELEVATORS FROM 930' MD TO 9500' MO - FILL PIPE EVERY 20 STANDS - PU 200 KLBS, SO 150 KLBS AT 9500' MD - MUD WEIGHT IN/OUT = 9.9 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL. GOOD_ DISPLACEMENT _ 11'.30 - 13:00 1.50 DRILL P 9,555.00 WEXIT ORIENT MOTOR AND DRILL20' OF NEW FORMATION TO 9575' MD, 8527' TVD - ORIENT MOTOR HIGH -SIDE AND WORK THROUGH WINDOW, 5-10 KLBS DRAG - 500 GPM, 2750 PSI ON BOTTOM, 2700 PSI OFF BOTTOM, 10 KLBS WOB - PU 200 KLBS, SO 157 KLBS - MUD WEIGHT IN/OUT = 9.9 PPG Printed 8/52019 12,08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: 1-3-22 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 71212019 End Date 7/23/2019 X3-019CC-C: (5,907,796 00 ) Project: Lisburne Site: 13 Page 8 of 24 Rig Name/No.: PARKER 272 Spud DatatTime: 11/4/1986 12.00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations __ (hr) _. _ (usft) 13:00 - 1330 0.50 DRILL P 9,555.00 WEXIT CIRCULATE A BOTTOMS UP PRIOR PERFORMING FIT - 500 GPM, 2700 PSI, 40 RPM, 10 KFT-LBS TORQUE 1330 - 1400 0.50 DRILL P 9,555.00 WEXIT RIG UPAND PERFORM FIT TO 11.4 PPG EMW - TOP OF 9-5/8" WINDOW: 9526MD, 8481' TVD - MUD WEIGHT IN/OUT = 9.9 PPG - PRESSURE UP TO 690 PSI WITH 1.5 BBLS PUMPED .- BLEED BACK 1.5 BBLS - WSUP_APPROVED FIT 14'.00 - 00.00 10.00 DRILL P 9,555.00 _ INTI DIRECTIONALLY DRILL B-1/2" INTERMEDIATE HOLE FROM 9575' MD TO 9831' MD, 8740' TVD -256' IN 10 HRS: 25.6 FT/HR ROP WITH CONNECTIONSAND SURVEYS '-525 GPM, 3250 PSI ON BOTTOM, 2960 PSI 'OFF BOTTOM - 50 RPM, 11 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM - 15-20 KLBS WOB - PU 204 KLBS, SO 160 KLBS, ROT 178 KLBS AT 9831' MD - SURVEY EVERY 30' - NO BACKREAMING AT CONNECTIONS - ECD: ACTUAL 10.3 PPG, CLEAN HOLE 10.1 PPG, HARDLINE 11.9 PPG - MUD WEIGHT IN/OUT= 9.9 PPG WBS: INTI 7/13/2019 00:00 - 0400 4.00 DRILL P 9,967.00 INTI DIRECTIONALLY DRILL 8-1/2" INTERMEDIATE HOLE FROM 9831' MD TO 9967' MD - 136' IN 4.5 HRS: 30.2 FT/HR ROP WITH CONNECTIONS AND SURVEYS - 525 GPM, 3380 PSI ON BOTTOM, 3010 PSI OFFBOTTOM - 50 RPM, 9 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM - 20 KLBS WOB - PU 200 KLBS, SO 160 KLBS, ROT 180 KLBS AT 9967' MD - SURVEY EVERY 30' - NO BACKREAMING AT CONNECTIONS - ECD: ACTUAL 10.3 PPG, CLEAN HOLE 10.1 PPG, HARDLINE 11.9 PPG - MUD WEIGHT IN/OUT = 9.9 PPG CONTROL DRILL LAST 50' FOR REVERSE DRILLING BREAK. OBSERVE REVERSE DRILLING BREAKAT 9966' MD AND DRILLED 1 ADDITIONAL FOOT TO 9967' MD 04:00 - 06:00 2.00 DRILL P 9,967.00 INTI CIRCULATE UP SAMPLES FOR GEOLOGY TO CONFIRM LISBURNE - 525 GPM, 3000 PSI - 50 RPM, 7 KFT-LBS TORQUE WELL SITE GEOLOGISTS CONFIRMED LISBURNE IN SAMPLES 1122A INTI CASING POINT CALLED AT 9967' MD, 8858' TVD Printed 8/512019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 9 of 24 Common Well Name: 13-22 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 7!712019 End Date. 7/23/2019 X3-019CC-C: (5,907,796.00 ) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Daternme: 11/4/1986 12:00 OOAM Rig Release: 7/27/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 Q68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operators (hr) _ (usft) 06:00 - 07:30 1.50 DRILL P 9,967.00 INTI CONDITION MUD AND CIRCULATE HOLE CLEAN PRIOR TO PULLING OFF BOTTOM - 525 GPM, 3000 PSI - 50 RPM, 7 KFT-LBS TORQUE - PUMP 40 PPB DRILL -AHEAD PILL AS SWEEP, NO SIGNIGICANT INCREASE IN CUTTINGS - TAKE AN ADDITIONAL 5 SURVEYS AS REQUIRED - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC SIMOPS: - BLED OFF OA FROM 850PSI TO I OOPSI (0.25 BBLS) _ 0730 - 0800 0.50 DRILL P 9,967.00 INT1 CONTINGENCY WIPER TRIP: PULL ON ELEVATORS FROM 9810'MD TO 9455' MD, INSIDE 9-5/8" CASING WINDOW '- PU 200 KLBS, 5O 160 KLBS AT 9810'MD -PULLAT 50 FPM -MUD WEIGHT IN/OUT =9.9 PPG '- MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD FILL - TIGHT HOLE FROM 9810'MD TO 9760'MD WITH 16-25 KLB OVERPULLS - 5-10 KLBS OVERPULL NOTED WHEN PULLING LOGGING AND MWD TOOLS THROUGH WINDOW (8-3/8" OD) -5-8 KLBS OVERPULL WHEN PULLING BIT _ THRU WINDOW 08:00 - 09:30 1.50 DRILL P 9,967.00 INTI CONTINGENCY WIPER TRIP: RUN IN THE HOLE ON ELEVATORS FROM 9455' MD TO 9640' MD. I - SET DOWN 30 KLBS AND ATTEMPT TO WORK PIPE DOWN REAM DOWN FROM 9640' MD TO 9967' MD - 525 GPM, 3025 PSI - 50 RPM, 7 KFT-LBS TORQUE OBSERVE INCREASE IN PUMP PRESSURE AND TORQUE EVERY 15' AND WHILE TOOL JOINTS GOING THROUGH WINDOW. 0930 - 1030 1.00 DRILL P 9,967.00 INTI CONDITION MUD AND CIRCULATE BOTTOMS UPATTD - 525 GPM, 3000 PSI - 50 RPM, 7 KFT-LBS TORQUE - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" Common Well Name. 13-22 Event Type: RE-ENTER- ONSHORE(RON) Lisburne North America - ALASKA - BP Paye 10 or 24 Operation Summary Report Staff Date. 7q/2019 End Date. 7/23/2019 Site. L3 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth (hr) _ _ _ (usft) 1030 - 11:30 1.00 DRILL P 9,967.00 11:30 - 15:00 3.50 DRILL P 9,967.00 15:00 - 17:30 2.50 DRILL P 9,967.00 17:30 - 18:00 0.50 CASING P 18.00 - 18:30 0.50 WHSUR P 9,967.00 8,887.00 AFE No K3-019CC-C:(5,907,796,00) BPUOI: USA00001272 Phase Description of Operations INT1 PULL OUT OF THE HOLE ON ELEVATORS FROM 9967' MD TO 9455' MD, INSIDE 9-5/8" CASING WINDOW - PU 200 KLBS, $0 160 KLBS AT 9967' MD - PULL AT 50 FPM -MUD WEIGHT IN/OUT= 9.8 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD FILL - MONITOR WELL FOR 10 MIN AT 9-5/8" WINDOW: STATIC -PUMP DRYJOB DROP 2-3/8" DRIFT FOR UPCOMING LINER RUN AT 9655' MD: 30 KLB OVERPULL: - WORK ONE TIME, PULLED THROUGH WITH 10 KLBS PVERPULL - 5-10 KLBS OVERPULL NOTED WHEN PULLING LOGGING AND MWD TOOLS 'THROUGH WINDOW (8-3/8" OD) '- 5-7 KLBS OVERPULL WHEN PULLING BIT THRU WINDOW INTI CONTINUE TO PULL OUT OF THE HOLE ON ELEVATORS WITH BHA#2, FROM 9455' MD TO 927' MD - PU 98 KLBS, SO 98 KLBS AT 927' MD - MUD WEIGHT IN/OUT = 9.9 PPG - MONITOR WELL WITH TRIP TANK AND HOLE FILL: GOOD FILL - MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARBLES THROUGH STACK: STATIC INTI PULLAND LAY DOWN BHA#2 PER BAKER DD /MWD - LAY DOWN 5 JTS OF 5" HWDP, JARS AND i NM DRILL COLLAR -PULL SOURCES FROM BHA - LAY DOWN 2 JTS OF NM DRILL COLLARS, FILTER, ORD AND CCN - DRAIN MOTOR AND BREAK BIT - LAY DOWN BCPM, PONY SUB, STAB AND MOTOR -DULL BIT GRADE: 1 -1 -CT -S -E -I -NO- -TD INTI CLEAN AND CLEAR RIG FLOOR WBS: INTICSG INTI MAKE UP 7" TEST JOINT, DRAIN STACKAND PULL WEAR RING Printed 8/5/2019 12:08:03PM "All depths reported in Drillers Depths" Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths— North America - ALASKA - BP Page 11 of 24 Operation Summary Report Common Well Name: L3-22 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date 7/7/2019 End Data 7/23/2019 X3-019CC-C: (5,907,796.00 ) Project: Lisburne Site: 1_3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00:00AM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. _ BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 uslt (above Mean Sea Level Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) . _. (use) 18:30 - 20:00 1.50 BOPSUR P 9,967.00 INTI CHANGE UPPER PIPE RAMS FROM 2-7/8" x 5" VBR TO 7" RAMS - CLOSE BLIND/SHEAR RAMS AND FILL CHOKE MANIFOLD AND MGS .- MONITOR WELL DURING RAM CHANGE THROUGH MGS -DE-ENERGIZE ACCUMULATOR AND OPEN DOORS - CHANGE RAMS, CLOSE DOOR AND TORQUE TO SPEC SIMOPS: -MOBILIZE DOYON CASING RUNNING EQUIPMENT TO RIG FLOOR '- RIG UP CASING TONGSAND 7" HANDLING ,EQUIPMENT_ 20:00 - 21:00 1.00 BOPSUR P 9,967.00 INTI TEST 7" UPPER RAMS TO 250 PSI LOW/ 23500 PSI HIGH FOR 5 MIN EACH - RUN IN THE HOLE AND SET TEST PLUG - FILLALL LINES AND PURGE AIR FROM SYSTEM __ _ _ _ __ _—_ ; __ -PRESSURE TEST RAMS: GOOD TEST 21:00 - 21:30 0.50 WHSUR P 9,967.00 INT1 PULLAND LAY DOWN TEST PLUG INSTALL 9-1/8" ID WEAR RING BLOW DOWN AND RIG DOWN TEST -EQUIPMENT 21:30 - 00:00 2.50 CASING P 9,967.00 INTI RUN 7", 26#, L-80, VAMTOP LINER TO 644' MD - CHECK FLOATS: HOLDING - USE JET LUBE SEAL GUARD PIPE DOPE - BAKER-LOK SHOE TRACK JOINTS - TORQUE VAMTOP CONNECTIONS TO 11950 FT -LBS - RUN 9 FREE FLOATING CENTRALIZERS ON JOINTS 1-9 - FILL CASING EVERY 10 JOINTS - PU 50 KLBS, SO 50 KLBS AT 644' MD MAKE UP LINER HANGER/PACKER ASSEMBLY PER WEATHERFORD REP -ADD PAL MIX --PICKUP BUMPER SUB, XO TO 4" DRILL PIPE Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths— Common Well Name: L3-22 Event Type. RE-ENTER- ONSHORE (RON) Lisburne North America - ALASKA - BP Operation Summary Report Start Date: //7/2019 End Date: 7/23/2019 Site: L3 AFE No K3-019CC-C.(5,907,796.00) Page 12 of 24 Rig Name/No.: PARKER 272 Spud Date/Time. 11/4/1986 12:00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. _ _ BPUOI: USA00001272 Active datum: ACTUAL K8 P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ __ (hr) _ (usft) . _ . 7/14/2019 00:00 - 08:00 9.00 CASING P 9,967.00 INTI CONTINUE TO RUN RUN 7',26#, L-80, VAMTOP LINER ON 4" DRILL PIPE STANDS - FROM 664' MD TO 9526' MD - RUN IN THE HOLE AT 90 FPM - FILL PIPE EVERY 20 STD - MONITOR DISPLACEMENT WITH HOLE FILL AND TRIPTANK: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.9 PPG CIRCULATE 1.5x LINER VOLUME AFTER MAKING UP THE LINER HANGER - STAGE UP TO 5 BPM, 115 PSI CIRCULATE 1x ANNULAR VOLUME AT 4676' MD PER CIRCULATING STRATEGY - STAGE UP TO 7 BPM, 525 PSI CIRCULATE 1x ANNULAR VOLUME AT THE 9-5/8" CASING WINDOW, 9526' MD - STAGE UP TO 7 BPM, ICP 900 PSI, FCP 870 PSI CONTINUE RUNNING IN OPEN HOLE AT 90 FT/MIN TO 9946' MD '- PU 165 KLBS, SO 140 KLBS - NO HOLE ISSUES NOTED WHILE RUNNING IN -OBSERVED 2-3 KLBS ADDITIONAL DRAG IN OPEN HOLE MAKE UP CEMENT HEAD AND SINGLE AND TAf. Rr1TTOM AT BORT Mn 09:00 - 10:30 1.50 CEMT P 9,967.00 INTI CONDITION MUDAND CIRCULATE FOR CEMENTJOB STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF BPM. - @ 2 BPM, 310 PSI, 8% RETURN FLOW - @ 3 BPM, 375 PSI, 9% RETURN FLOW - @ 4 BPM, 480 PSI, 10% RETURN FLOW - @ 5 BPM, 665 PSI, 11% RETURN FLOW - @ 6 BPM, 865 PSI, 12% RETURN FLOW - @ 7 BPM, 1095 PSI, 14% RETURN FLOW - CONDITION MUD TO 9.9 PPG, 18 YP - INITIAL PRESSURE AT CEMENTING RATE: 1095 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 1080 PSI -CIRCULATE TOTALOF 1 TIMES BOTTOMS -UP CEMENTERS Printed 8/5/2019 12:08:03PM ••AII depths reported in Drillers Depths" North America - ALASKA - SP Operation Summary Report Common Well Name: L3-22 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date 7/7/2019 End Date: 7/23/2019 X3-019CC-C: (5,907,796.00 ) Project: Lisburne Site: L3 Page 13 of 24 Rig Name/No.: PARKER 272 Spud Date/Time. 11/4/1986 12:00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr). __._.._ _(usft) 10:30 - 11:30 1.00 CEMT P 9,967.00 INTI SET LINER HANGER PER WEATHERFORD REPRESENTATIVE - DROP 1.5" SETTING BALLAND PUMP DOWN ON SEAT - PRESSURE UP TO 2300 PSI AND SET HANGER -SET DOWN 50 KLBS AND CONFIRM HANGER SET - PRESSURE UP TO 3650 PSI TO SHEAR OUT BALL SEAT - CIRCULATE 10 BELS TO CONFIRM CIRCULATION - BLEED OFF PRESSURE AND PU 3' TO CONFIRM RELEASED FROM HANGER -STING BACK IN LINER HANGER PER WEATHERFORD REP 11:30 - 13:00 1.50 13:00 - 14:00 1.00 CEMT P - - 9,967.00 CEMT P 9,967.00 SIMOPS: -PRESSURE TEST LINES TO4700 PSI FOR CEMENTING INT1 CIRCULATEAND CONDITION PRIOR TO CEMENTING FOR CREW CHANGE AND SAFETY MEETINGS - 7 BPM, 1080 PSI INTI CEMENT 7"INTERMEDIATE LINER AS FOLLOWS: - PUMP 30 BBLS OF 13 PPG MUDPUSH II SPACER Q 5 BPM, 500 PSI - DROP 1ST DRILL PIPE WIPER DART -PUMP 38.8 BBLS OF 15.8 PPG CLASS G TAIL @ 5 BPM, EXCESS VOLUME 40% (YIELD 1.16 CU. FT/SK) - DROP DRILL PIPE WIPER DART - KICK OUT WITH 10 BBLS OF WATER ON PLUG PERFORM DISPLACEMENT WITH RIG PUMPS - 38 BBLS DISPLACED AT 7 BPM: @ 125 PSI - 11 BBLS DISPLACED AT 3 BPM: 30 PSI - FIRST LATCH WAS NOT SEEN - 8 BBLS DISPLACED AT 7 BPM: 136 PSI - 8 BBLS DISPLACED AT 3 BPM: 125 PSI - IST PLUG BUMPED AT 65 BBLS DISPLACED, BURST @ 476 PSI - 11 BBLS DISPLACED AT 7 BPM: 1240 PSI 6 BBLS DISPLACED AT 3 BPM: 365 PSI - SECOND LATCH UP CONFIRMED AT 82 BBLS DISPLACED, RELEASED @ 1747 PSI - 13 BBLS DISPLACED AT 7 BPM'. 1560 PSI - REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 750 PSI -TOTAL DISPLACEMENT VOLUME 101 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) -CHECK FLOATS - GOOD - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT INP : 0 BBLS -CEMENT IN PLACE AT 13:54 Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 14 of 24 Common Well Name. 13-22 - 23:30 1.00 BOPSUR P 23:30 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7!7/2019 End Date. 7/23/2019 X3-019CC-C'. (5,907,796 00 ) Project: Lisburne CASING P Site: L3 EQUIPMENT - PULL TEST PLUG AND INSTALL 9-1/8" ID Rig Name/No.: PARKER 272 WEAR RING Spud Date/time: 11/4/1886 12:00:00AM INTI PICK UPAND MAKE UP BHA#3,6-1/8" Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. _ 6-1/8" DRILLING ASSEMBLY PER BAKER BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 ustt (above Mean Sea Level) - MAKE UPAUTOTRAK, ONTRAKAND BCPM - PLUG IN AND VERIFY TOOLS Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 14:00 - 15:30 1.50 CEMT P 9,967.00 INT1 ;SET LINER TOP PACKER AND CIRCULATE OUT EXCESS CEMENT FROM ON TOP OF LINER TOP - PICK UP TnXPOSE DOG SUB AND SET DOWN ON LINER TOP 73 KLBS, 10 RPM - RIG DOWN CEMENT LINE AND TUGGER FROM CEMENT HEAD - PICK UP TO REMOVE RS PACK-OFFAND CIRCULATE EXCESS CEMENT OFF LINER TOP - PICK UP RUNNING TOOLABOVE LINER TOP AND MARK NO-GO. CIRCULATE NUT PLUG SWEEP SURFACE TO SURFACE AT 15 BPM, 2870 PSI --70 BBLS OF CONTAMINATED MUD PUSH AND CEMENT TO SURFACE ON BOTTOMS UP SIMOPS: RIG DOWN SLB CEMENTERS 15:30 - 16:00 0.50 CEMT P 9,967.00 INTI LAY DOWN CEMENT HEAD AND DRILL PIPE _ SINGLE 16:00 - 18:30 3.50 CEMT P 9,967.00 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 9352' MD TO SURFACE - MONITOR WELL FOR 10 MINUTES: STATIC PU 158 KLBS, 50132 KLBS AT 9352' MID 19:30 - 20:00 0.50 WHSUR P 9,967.00 INTI MAKE UP 41/2" TEST JOINT ASSEMBLY AND DRAIN STACK PULL WEAR RING 20:00 - 21:00 1.00 BOPSUR �I P 9,967.00 INTI CHANGE UPPER 7" RAMS TO 2-7/8" z 5" VBR - CLOSE BLINDISHEAR RAMS AND MONITOR WELL THROUGH MGS - DE -ENERGIZE ACCUMULATOR AND OPEN RAM DOORS - CHANGE UPPER RAMSAND CLOSE DOORS 21:00 - 22:30 1.50 BOPSUR P I 9,967.00 INT 1 PRESSURE TEST UPPER 2-7/8" z 5" RAMS TO 22:30 - 23:30 1.00 BOPSUR P 23:30 - 00:00 0.50 CASING P 7/15/2019 00:00 - 02.00 2.00 CASING P 02:00 - 04:30 2.50 CASING N Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" 250 PSI LOW, 3500 PSI HIGH - INSTALL TEST PLUG - FILL LINES AND PURGE AIR FROM SYSTEM - TEST UPPER RAMS WITH 2-7/8" AND 4-1/2" TEST JOINTS 9,967.00 111 RIG DOWN AND BLOW DOWN TEST EQUIPMENT - PULL TEST PLUG AND INSTALL 9-1/8" ID WEAR RING 9,967.00 INTI PICK UPAND MAKE UP BHA#3,6-1/8" DRILLING ASSEMBLY PER BAKER DD/MWD 9,967.00 INT1 CONTINUE PICK UP AND MAKE UP BHA#3, 6-1/8" DRILLING ASSEMBLY PER BAKER DD/MWD - MAKE UPAUTOTRAK, ONTRAKAND BCPM - PLUG IN AND VERIFY TOOLS 9,967.00 INT1 TROUBLESHOOT COMMUNICATION FAILURE WITH MWD TOOLS TROUBLESHOOT COMMUNICATION FAILURE WITH DRILL-LINKAND BAKER MWD Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 15 of 24 Common Well Name: 13-22 AFE No Event Type. RE-ENTER- ONSHORE(RON) Start Dale: 7/7/2019 End Date. 7/23/2019 X3-019CC-C:(5,907.796.00) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00 OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. _ BPUOI: USA00001272 Active datum: ACTUAL KS P272 @68.31 usR (above Mean Sea Level Date From - To Him Task Code NPT Total Depth Phase Description of Operations -- -- (hr)_ _ _(usft)_ 04.30 - 05:30 1.00 CASING P .. 9,967.00 INTI ,PRESSURE TEST 7" LINER AND 9-5/8" CASING_ TO 3500 PSI FOR 30 MIN - 9 BBLS TO PRESSURE UP, BLED BACK 8.9 BBLS - LOST 40 PSI IN THE FIRST 15 MIN. -LOST 20 PSI IN THE SECOND 15 MIN - TEST MET CRITERIA PER BP PRACTICE 100218 TEST 3B - TEST APPROVED BY WSUP SIMOPS: - CONTINUE TO TROUBLESHOOT COMMUNICATION FAILURE WITH DRILL -LINK BAKER MWD 05:30 - 06:30 1.00 CASING N 9,967.00 INT1 _AND CONTINUE TO TROUBLESHOOT COMMUNICATION FAILURE WITH DRILL -LINK ,AND BAKER MWD Y . _ _-RESET ALL SYSTEMS SEVERAL TIMES 06:30 - 0930 3.00 CASING P 8,967.00 INTI CONTINUE TO PICK UPAND MAKEUP BHA#3, 6-1/8" DRILLING ASSEMBLY PER BAKER DD/MWD TO 450'MD - PLUG INTO MWD TOOLS AND PROGRAM -LOAD NUCLEAR SOURCES '- SHALLOW HOLE TEST MWD TOOLS AT SURFACE AND FUNCTION DRILL -LINK: NO ISSUES PU SOKLBS, 5O 50 KLBS _ 09:30 - 10:00 0.50 CASING P 9,967.00 INTI HOLD SAFETY STAND DOWN WITH HUNDLEY'S CREWAND RIG PERSONNEL REVIEW SUMMER TIME OUT FOR SAFETY MATERIAL AND DISCUSS 10:00 - 12:00 2.00 CASING P 9,967.00 INT1 RUN THE HOLE WITH BHA #3, ON ELEVATORS WITH 4" DP TO 6130'MD - PU 110 KLBS, SO 100 KLBS - FILL PIPE EVERY 30 STD -MONITOR DISPLACEMENT WITH HOLE FILL AND TRIP TANK, GOOD DISPLACEMENT -MW IN/OUT =9.9 PPG 12.00 - 12:30 0.50 CASING P 9,967.00 INT1 HOLD SAFETY STAND DOWN WITH YEAROUT'S CREW REVIEW SUMMER TIME OUT FOR SAFETY MATERIALAND DISCUSS 12.30 - 14:30 2.00 CASING P 9,967.00 INTI CONTINUE TO RUN THE HOLE WITH BHA#3, ON ELEVATORS WITH 4" DP FROM 6130' MD TO 8969' MD - PU 165 KLBS, SO 130 KLBS - FILL PIPE EVERY 30 STD - MONITOR DISPLACEMENT WITH HOLE FILL AND TRIP TANK, GOOD DISPLACEMENT -MW IN/OUT=9.8 14:30 - 15:30 1.00 CASING P 9,967.00 INTI SLIP AND CUT DRILL LINE - CUT 68' OF DRILL LINE - CALIBRATE AMPHION SYSTEM _ - CHECK FLOOR SAVER / CROWN SAVER 15:30 - 18:00 2.50 CASING P 9,967.00 INT1 PERFORM KICK WHILE TRIPPING/WELL KILL DRILL AND AAR WITH RIG CREW -CREW RESPONSE TIME 1.5 MIN Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" NorthAnnerica- ALASKA - BP Operation Summary Report Common Well Name: L3-22 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 7/7/2019 End Date'. 7/23/2019 X3-019CC-C: (5,907,796.00 ) Page 16 of 24 Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud DateRme: 11/4/1986 12:00:00AM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 (0368.31 usft (above Mean Sea Level) 9807' MD Date From - To Him Task Code NPT Total Depth Phase Description of Operations - (hr) _ (usft) 18:00 - 18:30 0.50 CASING P 9,967.00 INTI CONTINUE TO RUN THE HOLE WITH BHA M3 Printed 8/512019 12:08:03PM **All depths reported in Drillers Depths" FROM 8969' MDAND TAG HARD CEMENTAT 9807' MD - WASH DOWN AT 2 BPM, 455 PSI - PU 179 KLBS, SO 145 KLBS AT 9800' MD _ -MWIN/OUT_=_9.9 18:30 - 23:30 5.00 CASING P 9,967.00 INTI DRILL OUT HARD CEMENT AND FLOATS TO ' 10' ABOVE THE SHOE FROM 9807' MD TO 9956' MD, 8858' TVD -250 GPM, 1560 PSI ON, 1460 PSI OFF BTM, 100 RPM, TRO 10K ON 7K OFF BTM, 8-10 KLBS WOB ,- PU 183K, SO 138K, ROT 157K AT 9956' MD - MUD WEIGHT IN/OUT = 9.9 PPG 23:30 - 00:00 0.50 CASING P 9,967.00 INTI CIRCULATE AND CONDITION MUD FOR _ _ _ _ __ _ _ DISPLACEMENT_ _ _ _ 7/16/2019 00:00 - 02:00 2.00 CASING P 9,967.00 INTI DISPLACE WELL FROM 9.9 PPG LSND TO 8.5 PPG QUIKDRIL-N - 350 GPM: ICP 2560 PSI, FCP 1536 PSI - MONITOR WELL FOR 15 MIN AFTER -DISPLACEMENT: STATIC 02:00 - 02:30 0.50 CASING P 9,967.00 INTI DRILL OUT CEMENT AND SHOE TO 9966'MD - 300 GPM, 120OPSI -100 RPM, 8 KFT-LBS TORQUE - MONITOR WELLAFTER DRILLING SHOE FOR 10 MIN: STATIC _ 02:30 - 03:00 0.50 l CASING P 9,967.00 INT1 DRILL OUT 20'OF NEW FORMATION 709986' MD 03:00 - 03:30 0.50 CASING P 9,967.00 INT1 CIRCULATE WELL CLEAN PRIOR TO PERFORMING FIT - 350 GPM, 1190 PSI - MUD WEIGHT IN/OUT = 8.5 PPG 03:30 - 0500 1.50 CASING P 9,967.00 INTI RI. UP AND PERFORM FIT TO 9.8 PPG EMW - 0966' MD 8658' TVD - MUD WEIGHT IN/OUT = 8.5 PPG - PUMP 2.2 BBLS, BLEED BACK 2.0 BBLS - PRESSURE UP TO 605 PSI ' - ODE APPROVED FIT SIMOPS: - PERFORM WEEKLY BOP FUNCTION TEST WHILE WAITING FOR ODE TO APPROVE FIT 05.00 - 12:00 7.00 DRILL P 10,263.00 PROD? DIRECTIONAL DRILL 61/8"PRODUCTION HOLE FROM 9986' MD TO 10263' MD, 9052' TVD - 277 FT IN 7.0 HRS: 39.6 FT/HR ROP WITH CONNECTIONS AND SURVEYS - 300 GPM, 1240 PSI ON BOTTOM, 1220 PSI OFF BOTTOM - 140 RPM, 9 KFT-LBS TORQUE ON, 7 KFT-LBS TORQUE OFF, 15 KLBS WOB - PU 170 KLBS, SO 150 KLBS, ROT 162 KLBS AT 10200' MD - SURVEY EVERY 30', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG 10103'- 10124' MD: LOST 65 BBLS OVER 35 BBLS Printed 8/512019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 17 of 24 Common Well Name. 1.3-22 - 04'.00 3.00 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7!7/2019 End Date. 7/23/2019 X3-019CC-C (5,907,79600) Project: Lisburne Site: L3 CONSULT WITH BAKER TECH SUPPORTAND Rig Name/No.: PARKER 272 Spud Daterrime: 11/4/1986 12:00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. DOWNLINKS, ROTATION, PUMPING AND BPUCI: USA00001272 Active datum. ACTUAL KB P272 @68.31usft (above Mean Sea Level) PROD1 CIRCULATE A 35 BBL HIGH -VS SWEEP Date From - To Him Task Code NPT Total Depth Phase Descnption of Operations (hr) (usft) 12:00 - 20:30 8.50 DRILL P 10,576.00 PROD1 DIRECTIONAL DRILL61/8"PRODUCTION -NO INCREASE IN CUTTINGS OBSERVED WITH SWEEP AT SURFACE HOLE FROM 10263' MD TO 10576' MD, 9113' PROD1 PULLOUT OF THE HOLE ON ELEVATORS FROM 10576' MD TO 7" LINER SHOE AT 9966' TVD MD - MONITOR WELL FOR 10 MIN PRIOR TO - 313 FT IN 8.5 HRS: 36.8 FT/HR ROP WITH PULLING OFF BOTTOM: STATIC -PULL AT 50-90 FPM IN OPEN HOLE CONNECTIONS AND SURVEYS - PU 180 KLBS, SO 150 KLBS AT 10576' MD -MONITOR WELL WITH HOLE FILLAND TRIP i- 300 GPM, 1270 PSI ON BOTTOM, 1250 PSI TANK: GOOD FILL - MUD WEIGHT IN/OUT: 8.6 PPG OFFBOTTOM - MONITOR WELL FOR 10 MIN AT 7" LINER SHOE: WELL STATIC '- 140 RPM, 9 KFT-LBS TORQUE ON, 7 KFT-LBS PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM 9986' MD TO 500' MD TORQUE OFF, 5.15 KLBS WOB - PU 50 KLBS, SO 50 KLBS AT 500' MD - MONITOR WELL FOR FOR 10 MIN PRIOR TO - PU 181 KLBS, $0 147 KLBS, ROT 159 KLBS PULLING NON-SHEARABLES THROUGH THE STACK: STATIC AT 10576' MO PROD? PULLAND LAY DOWN BHA#3 PER BAKER DD/MWD �- SURVEY EVERY 30', NO BACK REAMING AT -RACK BACK 4"HWDP -UNLOAD SOURCES CONNECTIONS - LAY DOWN BHA COMPONENTS PER BAKER MWD REPRESENTATIVE -MUD WEIGHT IN/OUT: 8.6 PPG 2030 - 2200 1.50 DRILL N 22:00 - 00:00 2.00 DRILL N 7/17/2019 00:00 - 01:00 1.00 DRILL N 01.00 - 04'.00 3.00 DRILL N 0400 - 0600 2.00 DRILL N Printed 8/5/2019 12:08:03PM "Ail depths reported in Drillers Depths"' $IMOPS: - DRIFT AND STRAP 13-3/8" CASING FOR L3-06 -(NEXT WELL) OUTSIDE. _ 10,576.00 PRODi TROUBLESHOOT MWD ISSUES AT 10576' MD MAGNETOMETER IN ONTRAK LOCKED UP. CONSULT WITH BAKER TECH SUPPORTAND UNABLE TO FREE MAGNETOMETER. ATTEMPT TO UNSTICK WITH ADDITIONAL DOWNLINKS, ROTATION, PUMPING AND PULLING STAND 10,576.00 PROD1 CIRCULATE A 35 BBL HIGH -VS SWEEP SURFACE TO SURFACE PRIOR TO PULLING OUT OF THE FOR FAILED MWD - 325 GPM, 1490 PSI -120 RPM, 8 KFT-LBS TORQUE - RECIPROCATE PIPE 90' DURING CIRCULATION -NO INCREASE IN CUTTINGS OBSERVED WITH SWEEP AT SURFACE 10,576.00 PROD1 PULLOUT OF THE HOLE ON ELEVATORS FROM 10576' MD TO 7" LINER SHOE AT 9966' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC -PULL AT 50-90 FPM IN OPEN HOLE - PU 180 KLBS, SO 150 KLBS AT 10576' MD -MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL - MUD WEIGHT IN/OUT: 8.6 PPG - MONITOR WELL FOR 10 MIN AT 7" LINER SHOE: WELL STATIC 10,576.00 PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM 9986' MD TO 500' MD - PU 50 KLBS, SO 50 KLBS AT 500' MD - MONITOR WELL FOR FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH THE STACK: STATIC 10,576.00 PROD? PULLAND LAY DOWN BHA#3 PER BAKER DD/MWD -RACK BACK 4"HWDP -UNLOAD SOURCES - LAY DOWN BHA COMPONENTS PER BAKER MWD REPRESENTATIVE Printed 8/5/2019 12:08:03PM "Ail depths reported in Drillers Depths"' Common Well Name: 1-3-22 Event Type: RE-ENTER- ONSHORE (RON1) Project: Lisburne North America - ALASKA - BP Page 16 of 24 Operation Summary Report Start Date: 7/7/2019 End Date 7/23/2019 Site: L3 AFE No X3-019CC-C. (5,907 796 00 ) I Nlg Name/NO.: HAKKER 272 Spud Date/Time: 11/4/1986 12:00:00AM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL N 10,576.00 PRODi PICKUP AND MAKEUP BHA #4, 6-118" 12:00 - 17:30 5.50 DRILL 17:30 - 20:30 3.00 DRILL 20:30 - 0000 3.50 DRILL 7/18/2019 00:00 - 01:30 1.50 DRILL 01:30 - 0400 2.50 DRILL 04.00 - 0900 5.00 - SHALLOW HOLE TEST TOOLS AT 156' MD DRILL 0900 - 1200 300 DRILL Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" DRILLING ASSEMBLY PER BAKER DD/MWD TO 450' MD - CHANGE OUT AUTOTRAK, ONTRAK, AND BCPM -PLUG IN AND VERIFY TOOLS - SHALLOW HOLE TEST TOOLS AT 156' MD (GOOD TEST) N 10,576.00 PROD? RUN IN THE HOLE WITH 4" DP ON ELEVATORS FROM 450' MD TO THE 7" LINER SHOE AT 9966' MD -ATTEMPT TO CALIBRATE CALIPER IN LWD, . BCPM NOT PULSING N 10,576.00 PROD1 TROUBLESHOOT BCPM - 300 GPM, 1588 PSI, 50 RPM, 7 KFT-LBS TORQUE .- PUMP 20 BBL HI -VIS / WEIGHTED SEAWATER SWEEP IN AN ATTEMPT TO WASH OUT BCPM, NO SUCCESS N 10,576.00 PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM THE 7" LINER SHOEAT 9966' MD TO THE TOP OF THE BHAAT 450' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM AND AT THE TOP OF THE BHA (STATIC) -MUD WEIGHT IN/OUT=8.7 PPG -TEST MWD AT 5170'MD, 350 GPM, 1200 PSI, NO SUCCESS N 10,576.00 PROD1 LAY DOWN BCPM UNLOAD SOURCES N 10,576.00 PROD1 PICK UP NEW BCPM - PLUG INTO MWD TO CONFIRM COMMUNICATION - SURFACE TEST TOOLS (GOOD TEST) -LOAD SOURCES N 10,576.00 PRODi RUN THE HOLE WITH BHA#5, ON ELEVATORS V41TH 4" DP TO 10300' MD - FILL PIPE EVERY 30 STD, ENSURE TOOL IS PULSING EVERY FILL WITH 300 GPM -MONITOR DISPLACEMENT WITH HOLE FILL AND TRIP TANK, GOOD DISPLACEMENT -MW IN/CUT =8.7 PPG -OBSERVE TIGHT SPOT AT 10300' MD, SET DOWN 20 KLBS N 10,576.00 PRODt WASH AND REAM THROUGHT TIGHT SPOT FROM 10300' MD TO BOTTOM AT 10576' MD - 300 GPM, 1300 PSI, 100 RPM, 7-9 KFT-LBS TORQUE - OBSERVE ERRATIC TORQUE AND PARTIAL PACKOFFS WHILE REAMING DOWN Printed 8/5/2019 12:08:03PM **All depths reported in Drillers Depths" Common Well Name: 1-3-22 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Operation Summary Report Stan Date. 7/7/2019 End Date: 7/23/2019 AFE No K3-019CC-C.(5,907,796.00) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00:OOAM Rig Release: 7/27/2019 Page 19 of 24 Rig Contractor. PARKER DRILLING CO. Active datum: ACTUAL KB P272 @68.31 usfl (above Mean Sea Level) BPUOI: USA00001272 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ NsB)_._ 12:00 - 19:00 7.00 DRILL P 10,900.00 PROD? DIRECTIONAL DRILL 61/8" PRODUCTION HOLE FROM 10576' MD TO 10900' MD - 324 FT IN 7.0 HRS: 46 FT/HR ROP WITH CONNECTIONS AND SURVEYS - 300 GPM, 1380 PSI ON/OFF BOTTOM -120-140 RPM, 10 KFT-LBS TORQUE ON, 8 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB -PU 178 KLBS, SO 133 KLBS, ROT 154 KLBS AT 10858' MD - SURVEY EVERY 30', NO BACK REAMING AT i CONNECTIONS -MUD WEIGHT IN/OUT =8.7 PPG 19:00 - 00:00 5.00 DRILL P 7/19/2019 00:00 - 06:00 6.00 DRILL P 10,900.00 PROD1 11119.00 PROD1 Printed 8/512019 12:08.03PM **All depths reported in Drillers Depths" - DO NOTIFIED WSL THE STAR TRAK NOT WORKING, NOTIFY ODE, DECISION MADE TO CONTINUE DRILLING '- OBSERVE TORQUE SPIKE AND TOTAL LOST CIRCULATION AT 10900' MD MANAGE LOSSES PICK UP OFF BOTTOM TO 10858' MD, KEEP PIPE MOVING PERIODICALLY WHILE MANAGING LOSSES -- INITIALIZE HOLE FILL ON ANNULUS AT 5 BPM IN ATTEMPT TO FILL THE HOLE - PUMP 40 BBL DRILLAHEAD PILL, NO CHANGE IN LOSSES, MAINTAIN 1 BPM DOWN DRILLSTRING TO PREVENT PLUGGING - MAKE NOTIFICATIONS TO WOS (WSUP DOA) AND ODE - MOBILIZE SUPPORT FOR SEAWATER INJECTION LINE - BUILD AND PUMP 80 BBL DRILLAHEAD PILL WHILE BUILDING MUD VOLUME IN PITS -OBSERVE RETURNS WHEN DRILLAHEAD PILL EXITED THE BIT - STATIC LOSS RATE OF -200 BPH - DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM, RECEIVE APPROVAL TO DRILL 100' MD WITH >20 BPH LOSSES TO ASSESS LOSS RATE - BUILD MUD VOLUME AND PREPARE TO DRILLAHEAD - STATIC LOSS RATE HEALED TO 60-80 BPH WHILE BUILDING MUD VOLUME DIRECTIONAL DRILL 61/8" PRODUCTION HOLE FROM 10900' MD TO 11119' MD - 219 FT IN 6 HRS: 37 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 300 GPM, 1280 PSI ON/OFF BOTTOM - 120-140 RPM, 10 KFT-LBS TORQUE ON, 9 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 174 KLBS, SO 127 KLBS, ROT 152 KLBS AT 11100' MD - SURVEY EVERY 30', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.8 PPG - INITIAL DYNAMIC LOSS RATE -200 BPH, HEALED TO -60 BPH DYNAMIC LOSS RATE STARTRAK WORKING INTERMITTENTLY Common Well Name: 13-22 Event Type: RE-ENTER- ONSHORE(RON) Lisburne North America - ALASKA - BP Page 20 or 24 Operation Summary Report Start Date: 7/7/2019 Site: L3 Active datum: ACTUAL KB P272 @68,31 usft (above Mean Sea Level) Date From - To Hrs Task Code NPT (hr) 0600 - 1200 6.00 DRILL P 12:00 - 18:00 6.00 DRILL P 1800 - 0000 6.00 DRILL P AFE No End Date. 7/23/2019 X3-019CC-C'. (5,907,796.00 ) Release: 7/27/2019 Total Depth Phase Description of Operations lush) _ 11,285.00 PRODi DIRECTIONAL DRILL 61/8"PRODUCTION HOLE FROM 11119' MD TO 11285' MD - 166 FT IN 6 HRS: 28 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL ,- 310 GPM, 1430 PSI ON/OFF BOTTOM - 140 RPM, 10 KFT-LBS TORQUE ON, 9 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB -PU 175 KLBS, SO 128 KLBS, ROT 153 KLBS AT 11240' MD - SURVEY EVERY 30', NO BACK REAMING AT 'CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --90 BPH DYNAMIC LOSS RATE .- STARTRAK WORKING STEADY li - PUMP 40 BBL DRILLAHEAD PILLAT 11166' MD, NO CHANGE IN LOSS RATE - PUMP 80 BBL DRILLAHEAD PILLAT 11240' MD, NO CHANGE IN LOSS RATE 11,397.00 PRODi 'DIRECTIONAL DRILL 6118" PRODUCTION HOLE FROM 11285' MD TO 11397' MD '- 112 FT IN 6 HRS: 19 FT/HR ROP WITH CONNECTIONSAND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 310 GPM, 1370 PSI ON/OFF BOTTOM -140 RPM, 10 KFT-LBS TORQUE ON, 9 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 178 KLBS, SO 127 KLBS, ROT 151 KLBS AT 11397' MD - SURVEY EVERY 30', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG -75 BPH DYNAMIC LOSS RATE 11,804.00 PROD? DIRECTIONAL DRILL 61/8" PRODUCTION HOLE FROM 11397' MD TO 11804' MD -407 FT IN 6 HRS: 68 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 330 GPM, 1570 PSI ON/OFF BOTTOM - 120 RPM, 10 KFT-LBS TORQUE ON, 8 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 185 KLBS, SO 134 KLBS, ROT 152 KLBS AT 11804' MD - SURVEY EVERY 90', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --80 BPH DYNAMIC LOSS RATE - PUMP 35 BBL HI -VIS SWEEP AT 11723' MD, NO INCREAS IN CUTTINGS BACKAT SHAKERS Printed 8/5/2019 12-,08:03PM "All depths reported in Drillers Depths" Common Well Name. 13-22 Event Type: RE-ENTER- ONSHORE (RON) North America - ALASKA - BP Page 21 or 24 Operation Summary Report Start Date. 7/7/2019 End Date: 7/232019 AFE No X3-019CC-C'. (5,907,796.00 ) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Daterriime: 11/4/1986 12:00 OOAM Rig Release: 7/272019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- — - __ _-- . (hr) (usft) _ 7/202019 00:00 - 06:00 6.00 DRILL P 12,350.00 PRODi DIRECTIONAL DRILL61/8"PRODUCTION HOLE FROM 11 804'MD TO 12350' MD - 546 FT IN 6 HRS: 91 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 330 GPM, 1650 PSI ON/OFF BOTTOM - 120 RPM, 10 KFT-LBS TORQUE ON, 8 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 185 KLBS, SO 134 KLBS, ROT 152 KLBS AT 11804' MD - SURVEY EVERY 90', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --60_-80 BPH DYNAMIC LOSS RATE 06:00 - 12:00 6.00 DRILL P 12,788.00 PROD? 'DIRECTIONAL DRILL 6 1/8" PRODUCTION HOLE FROM 12350' MD TO 12788' MD - 438 FT IN 6 HRS: 73 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 330 GPM, 1680 PSI ON/OFF BOTTOM '- 120 RPM, 12 KFT-LBS TORQUE ON, 10 ' KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB PU 195 KLBS, SO 120 KLBS, ROT 152 KLBS AT 12750' MD SURVEY EVERY 90', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --60-80 BPH DYNAMIC LOSS RATE 12:00 - 18:00 6.00 DRILL P 12,962.00 PROD? DIRECTIONAL DRILL 61/8'PRODUCTION HOLE FROM 12788' MD TO 12962' MD - 174 FT IN 6 HRS: 29 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 330 GPM, 1650 PSI ON/OFF BOTTOM - 120 RPM, 12 KFT-LBS TORQUE ON, 10 KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB - PU 195 KLBS, SO 120 KLBS, ROT 152 KLBS AT 12750' MD - SURVEY EVERY 90', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --60-80 BPH DYNAMIC LOSS RATE Printed 8/5/2019 12:08r03PM •'All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 22 of 24 Common Well Name: -3-22 AFE No Event Type'. RE-ENTER- ONSHORE (RON) Start Date. 7F7/2019 End Date. 7/23/2019 X3-019CC-C: (5,907,796.00 ) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Date/rime: 11/4/1986 12.00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. _ BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations __._(hr)_ (usft) 18:00 - 00:00 6.00 DRILL P 13,090.00 PROD? DIRECTIONAL DRILL81/8'PRODUCTION HOLE FROM 12962' MD TO 13090' MD - 128 FT IN 6 HRS: 21 FT/HR ROP WITH CONNECTIONS AND SURVEYS, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 300 GPM, 1475 PSI ON/OFF BOTTOM - 80 RPM, 13 KFT-LBS TORQUE ON, 11 KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB - PU 187 KLBS, SO 115 KLBS, ROT 150 KLBS AT 13034' MD '- SURVEY EVERY 90', NO BACK REAMING AT 'CONNECTIONS -MUD WEIGHT IN/OUT =8.6 PPG --60-80 BPH DYNAMIC LOSS RATE -OBSERVE DIRECTIONAL TOOLS MALFUNCTIONING, DIFFERENT TOOLS . GOING IN/OUT AND DE -SYNCING, REQUIRE RECYCLE OF MUD PUMPS TO SYNC UP EACH TIME, ADJUST DRILLING PARAMETERS TO MAINTAIN SYNC 7/21/2019 00:00 - 02:00 2.00 DRILL P 13,114.00 PROD1 DIRECTIONAL DRILL 61/8'PRODUCTION HOLE FROM 13090' MD TO 13114' MD - 24 FT IN 2 HRS: 12 FT/HR ROP - 300 GPM, 1475 PSI ON/OFF BOTTOM - 80 RPM, 13 KFT-LBS TORQUE ON, 11 KFT-LBS TORQUE OFF, UP TO 5 KLBS WOO - PU 187 KLBS, $O 115 KLBS, ROT 150 KLBS AT 13034' MD -SURVEY EVERY 90', NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.6 PPG --80-80 BPH DYNAMIC LOSS RATE - UNABLE TO CONTINUE DRILLING WITH THE DIRECTIONAL TOOLS IN THEIR CURRENT CONDITION. DECISION MADE TO POOH AND CHANGE OUT DIRECTIONAL TOOLS _ 02:00 - 04:00 2.00 DRILL N 13,114.00 PROW CIRCULATE HOLE CLEAN WITH 1X BOTTOMS UP - 330 GPM, 1700 PSI, 120 RPM, 10 KFT-LBS TORQUE - RECIPROCATE 70' - MONITOR THE WELL FOR 10 MIN (STATIC _ _ _ LOSSES_)_ 04:00 - 05:30 1.50 DRILL N 13,114.00 PROD1 PULL OUT OF THE HOLE FROM 13114'MD TO 12270' MD - OBSERVE TIGHT HOLE FROM 12390' MD TO 12270' MD, ATTEMPT TO WORK THROUGH TIGHT HOLE WITH UP TO 40 KLBS OVER STRING WEIGHT WITH LITTLE SUCCESS --35 BPH STATIC LOSSES WHILE PULLING OUT OF THE HOLE Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 23 of 24 Operation Summary Report Common Well Name: L3-22 A=E No Event Type'. RE-ENTER- ONSHORE (RON) Start Date. 7!7/2019 Eno Date 7/23/2019 X3-019CC-C. (5,907 796 00 ) Project: Lisburne Site: L3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00DGAM Rig Release: 7/27/2019 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) _ 05:30 - 13:00 7.50 DRILL N 13:00 - 15:00 2.00 15:00 - 19:30 4.50 19:30 - 21:00 21:00 - 21:30 21:30 - 22:30 1.50 DRILL N DRILL N DRILL N 0.50 DRILL N 1.00 DRILL N 22:30 - 00:00 1.50 DRILL N 7/22/2019 00:00 - 01:00 1.00 01:00 - 01:30 0.50 01:30 - 05:00 3.50 DRILL N DRILL N DRILL N Total Depth Phase Description of Operabons (usft) 13,114.00 PROD? BACKREAM FROM 12270' MD TO 9966' MD - 330 GPM, 1550 PSI, 140 RPM, 10 KFT-LBS TORQUE -OBSERVE MULTIPLE TORQUE SPIKESAND THICK FILTER CAKE IN RETURNS WHILE BACKREAMING - UNABLE TO CONTINUE BACKREAMING AT 10795' MD DUE TO HOLE GEOMETRY ISSUES, CONTINUE PULLING OUT OF THE HOLE WHILE PUMPING 2 BPM TO THE 7" LINER SHOE AT 9966' MD 13,114.00 PROD1 CIRCULATE HOLE CLEAN WITH 1.5 BOTTOMS UP - 330 GPM, 1350 PSI - 100 RPM, 6 KFT-LBS TORQUE ,- PUMP 35 BBL HIGH VIS SWEEP SURFACE TO SURFACE, 25% INCREASE IN CUTTINGS • 'BACK AT SHAKERS - MONITOR THE WELL FOR 10 MIN (-35 BPH - LOSSES)_ _ 13,114.00 PROD? PULL OUT OF THE HOLE ON ELEVATORS FROM 9966'MD TO THE TOP OF THE BHAAT 446' MD • --35 BPH STATIC LOSSES WHILE PULLING OUT OF THE HOLE SIMOPS: - PRESSURE TEST THE CHOKE MANIFOLD _OFFLINE 13,114.00 PRODi LAY DOWN BHA FROM 446' MD TO SURFACE -BIT GRADE: 1 -1 -IN GAGE - NO OBVIOUS SIGNS OF REASON FOR MALFUNCTION OF DIRECTIONAL TOOLS 13,114.00 PROD1 CLEAN AND CLEAR RIG FLOOR 13,114.00 PROD1 RIG UP BOPE PRESSURE TESTING EQUIPMENT - PULL WEAR BUSHING AND SET TEST PLUG FILL STACK AND PURGE AIR FROM SYSTEM 13,114.00 PROD1 PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MIN EACH - TEST WITH 4-1/2" AND 2-7/8" TEST JOINTS -TESTALARMS, PVTAND FLOW SHOW - NO FAILURES -MONITOR WELL WITH CONTINUOUS HOLE FILL BELOW THE TEST PLUG (35 BPH LOSS RATE) - TEST WITNESS WAIVED BY AOGCC REP LOU LAUBENSTEIN 13,114.00 PROD1 COMPLETE BOPE TEST 13,11400 PROD1 RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG AND SET WEAR BUSHING _ (6-15/16" ID) 13,114.00 PROD? MAKE UP 6-1/8" BHA TO TOTAL LENGTH OF 446' MD -6-1/8" SKC613M-V3 PDC BIT (RERUN FROM LAST RUN) -AUTOTRAK, ONTRAK, SDN, STARTRAK - SURFACE TEST MWD TOOLS (GOOD TEST) Printed 8/52019 12:08:03PM "All depths reported in Drillers Depths`" Common Well Name: L3-22 Event Type. RE-ENTER- ONSHORE (RON) Project: Lisburne Rig Name/No.: PARKER 272 North America - ALASKA - BP Page 24 of 24 Operation Summary Report Start Date. 7/7/2019 Site: L3 Active datum: ACTUAL KB P272 @68.311 (above Mean Sea Level) Date From - To HIM Task Code (hr) 05:00 - 1400 9.00 DRILL N AFE No End Date. 7/23/2019 X3-019CC-C. (5,907,796.00 ) Rig Release: 7/272019 NPT Total Depth Phase Description of Operations (usft) 1.00 13,114.00 PROD1 RUN IN THE HOLE ON 4" DP FROM 446' MD TO 00:00 BOTTOM AT 13114' MD 2.50 - WASH THROUGH HIGH DLS HOLE SECTION FROM 10831' MD TO 10883' MD, WITH 5 BPM, 1400 PSI, 50 RPM, 10 KFT-LBS -WASH AND REAM HIGH DLS SECTION FROM 12375' MO TO BOTTOM AT 13114' MD WITH 330 GPM, 1950 PSI, 80 RPM, 9 KFT-LBS TORQUE --35 BPH LOSSES 14'.00 - 23:00 9.00 DRILL P 13,699.00 PROD? DIRECTIONAL DRILL 61/8" PRODUCTION 02:30 - 0800 5.50 DRILL P 0800 - 1030 2.50 DRILL P 23:00 - 00:00 1.00 DRILL P 7/23/2019 00:00 - 0230 2.50 DRILL P 02:30 - 0800 5.50 DRILL P 0800 - 1030 2.50 DRILL P Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths" ,HOLE FROM 13114' MD TO 13699' MD - 585 FT IN 9 HRS: 65 FT/HR ROP - 330 GPM, 1760 PSI ON/OFF BOTTOM - 80-120 RPM, 13 KFT-LBS TORQUE ON, 12 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 204 KLBS, SO 109 KLBS, ROT 151 KLBS AT 13604' MD '- SURVEY EVERY 901, NO BACK REAMING AT CONNECTIONS - MUD WEIGHT IN/OUT = 8.7 PPG --60-80 BPH DYNAMIC LOSS RATE - REDUCE PARAMETERS WHILE DRILLING WITH DIRECTIONAL TOOLS ACROSS HIGH DLS_FR_O_M 13538' MD TO 1361 0'MD 13,699.00 PROD1 CIRCULATE HOLE CLEAN WITH 2X BOTTOMS UP - 350 GPM, 1950 PSI -120 RPM, 11 KFT-LBS TORQUE 13,699.00 PROD1 CIRCULATE HOLE CLEAN WITH 2X BOTTOMS UP - 350 GPM, 1950 PSI - 120 RPM, 11 KFT-LBS TORQUE - PUMP TANDEM LOW VIS / HIGH VIS SWEEP, 10% INCREASE IN CUTTINGS BACKAT SHAKERS - MONITOR WELL FOR 10 MIN (STATIC LOSSES) 13,699.00 PROD: PULL OUT OF THE HOLE FROM BOTTOM AT 13699' MD TO THE TOP OF THE BHAAT 446' MD - MONITOR WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC LOSSES) --40 BPH LOSS RATE - DROP 2-3/8" DRIFT AT THE 7" LINER SHOE 13,699.00 PROD1 LAY DOWN BHA FROM 450' MD TO SURFACE -BIT GRADE: 1 -1 -IN GAGE - CLEAN AND CLEAR RIG FLOOR Printed 8/52019 12:08:03PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 1 of 6 Common Well Name: L3-22 - 22:00 3.00 AFE No Event Type. COM -ONSHORE (CON) Start Date: 7/23/2019 End Date: 7/27/2019 X3-019CC-C: (3,937,060.00 ) Project: Lisburne Site: L3 22:30 - 00:00 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4/1986 12:00:00AM P Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. - FILL LINER ON THE FLYAND TOP OFF BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) - PU 78K, SO 78K WITH LINER FULLY PICKED Date From - To Hrs Task Cade NPT Total Depth Phase Description of Operations (hr) (usft) 7/23/2019 10:30 - 12:00 1.50 CASING P 13,699.00 RUNPRD RIG UP LINER RUNNING EQUIPMENT RUNPRD CONTINUE IN HOLE TO THE T' LINER SHOE AT 9966' MD ON 4" DRILL PIPE - RIG UP DOUBLE STACK TONGS, ELEVATORS - RIH AT 90 FT/MIN _ - MUD LOSSES WHILE RIH: -_40 BPH _ AND AIR SLIPS 12:00 - 19:00 7.00 CASING P 19:00 - 22:00 3.00 CASING P 22:00 - 22:30 0.50 CASING P 22:30 - 00:00 1.50 CASING P 7/24/2019 00:00 - 01:30 1.50 CASING P LINER TO TOTAL LENGTH OF 4045' MD 01:30 - 10:00 8.50 CASING P SIMOPS: - RIG UP CEMENT TRUCKS - LAY DOWN STANDS OF 4" DP Printed 8/5/2019 12:08:39PM **AA depths reported in Drillers Depths" WBS:RUNPRD 13,699.00 RUNPRD RUN 4-1/2", 12.6#, 13CR-85, PRODUCTION LINER TO TOTAL LENGTH OF 4045' MD -CHECK FLOATS (HOLDING) - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 4440 FT -LBS - RUN 2 CENTRALIZER PER JOINT ON JOINTS 1-85 - FILL LINER ON THE FLYAND TOP OFF EVERY 10 JOINTS - PU 78K, SO 78K WITH LINER FULLY PICKED UP . MAKE UP LINER HANGER/PACKER ASSEMBLY - ADD GELTO HANGER VOID - CIRCULATE LINER VOLUME AT 5 BPM, 130 PSI MUD LOSSES WHILE RIH: -40 BPH 13,699.00 RUNPRD CONTINUE IN HOLE TO THE T' LINER SHOE AT 9966' MD ON 4" DRILL PIPE - RIH AT 90 FT/MIN _ - MUD LOSSES WHILE RIH: -_40 BPH _ 13,699.00 RUNPRD CIRCULATE 1.5X BOTTOMS UPATS BPM, 340 PSI - PU 160K, SO 130K - MUD LOSSES: -50 BPH 13,699.00 RUNPRD RUN INTO OPEN HOLE WITH LINER TO 11907' MOAT MIDNIGHT - PU 180K, SO 125K - MUD WEIGHT: 8.7 PPG IN, 8.7 PPG OUT -MUD LOSSES WHILE RIH: -40 BPH - NO ISSUES RUNNING THROUGH OPEN HOLE 13,699.00 RUNPRD RUN IN THE HOLE WITH 4-1/2" PRODUCTION LINER ON 4" OP FROM 11907' MD TO PLANNED SET DEPTH AT 13697' MD - WASH DOWN THE LAST STAND AT 2 BPM, 300 PSI, TAG BOTTOM AND PICK UP STRETCH +2' - NO ISSUES RUNNING THROUGH OPEN HOLE TO BOTTOM - FINAL PU 190K, SO 125K 13,699.00 RUNPRD STAGE UP PUMPS IN 1 BPM INCREMENTS TO CEMENTING RATE AT 5 BPM - 5 BPM, 640 PSI - RECIPROCATE 25' AT SURFACE - INITIAL LOSSES -110 BPH, FINAL LOSSES 80 BPH SIMOPS: - RIG UP CEMENT TRUCKS - LAY DOWN STANDS OF 4" DP Printed 8/5/2019 12:08:39PM **AA depths reported in Drillers Depths" North America - ALASKA - BP Page 2 of 6 Operation Summary Report Common Well Name. 13-22 Phase Description of Operations Event Type: COM- ONSHORE (CON) Project: Lisburne Start Date: 7/23/2019 Site: 1_3 Rig Name/No.: PARKER 272 Spud Date/Time: 11/4 Active datum: ACTUAL KB P272 068.31 usft (above Mean Sea Level) Date From - To Hrs Task Code (hr) 10:00 - 12:00 2.00 CASING P 12:00 - 12:300.50 CASING P 12:30 - 15:00 2.50 CASING P 15:00 - 18:30 3.50 18:30 - 19:30 1.00 CASING P AFE No End Date. 7/27/2019 X3-019CC-C.(3, 937,060 00) 7/27/2019 BPUOI: USP NPT Total Depth Phase Description of Operations (usft) 13,699.00 RUNPRD CEMENT4-1/2" PRODUCTION LINER AS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 4500 PSI FOR 5 MINUTES — PUMP 30 BBLS OF 8.6 PPG MUDPUSH II SPACER @ 5 BPM, 600 PSI - PUMP 142 BBLS OF 8.6 PPG BIMODAL 0 5 BPM, EXCESS VOLUME 100% (YIELD 3.31 _ CU.FT/SK) - DROP DRILL PIPE WIPER DART PERFORM DISPLACEMENT WITH SLB CEMENTPUMPS - 150 BBLS DISPLACED AT 5 BPM ICP 820 PSI, FCP 1150 PSI, SLOW TO 3 BPM FOR LATCH UP, LATCH UP CONFIRMEDAT 98 BBL DISPLACED - 9.7 BBLS DISPLACED AT 3 BPM: ICP 700 PSI, FOP 725 PSI - DISPLACEMENT FLUID: 159.7 BBL OF 8.6 PPG OUICKDRIL-N '- REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 725 PSI .- TOTAL DISPLACEMENT VOLUME 159.7 EELS -CIPQ11:43 `TOTAL LOSSES FROM CEMENT EXIT SHOE _ TO CEMENT IN PLACE: 46 BELS 13,699.00 RUNPRD SET AND RELEASE FROM LINER HANGER - INCREASE PRESSURE TO 2500 PSI TO SET HANGER AFTER PLUG BUMP - SET DOWN 70K TO CONFIRM HANGER SET -CHECK FLOATS - GOOD - PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 60K, 15 RPM TO SET PACKER - NO LOSSES AFTER SETTING PACKER - PU TO REMOVE RS PACK -OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP - PU RUNNING TOOLABOVE LINER TOPAND MARKNO-GO - TOP OF LINER SETAT 9683'MD _ 13,699.00 RUNPRD DISPLACE 8.7 PPG OUICKDRIL-N WITH 8.5 PPG SEAWATER - 15 BPM, 2000 PSI --20 BBLS OF EXCESS CEMENT TO SURFACE ON BOTTOMS UP - LAY DOWN CEMENT HEAD - PERFORM 5 MIN ASSURANCE TEST ON PRODUCTION LINER (GOOD TEST) 13,699.00 RUNPRD PULL OUT OF THE HOLE FROM THE TOP OF THE LINER AT 9683' MD TO SURFACE - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE (STATIC) - LINER RUNNING TOOL INTACT CASING P 13,699.00 RUNPRD CUT AND SLIP DRILL LINE _ - RECLIBRAT_E_BLOCK HEIGHT IN AMPHION 19:30 - 20:30 1.00 CASING P 13,699.00 OTHCMP RIG UP CASING CREW TO RUN 2-7/8" PAC PIPE -RIG UP DOUBLESTACK TONGS AND ELEVATORS Printed 8/5/2019 12.08:39PM **All depths reported in Drillers Depths" Common Well Name. 1-3-22 Event Type: COM- ONSHORE (CON) Project: Lisburne North America - ALASKA- BP Page 3 of 6 Operation Summary Report AFE No Start Date: 7/23/2019 End Date. 7/27/2019 X3-019CC-C: (3,937 060 00 ) Site: L3 7/27/2019 Active datum. ACTUAL KB P272 088.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 CASING N 13,699.00 OTHCMP WAIT ON PERF GUNS TOARRIVE ON T LOCATION 21:30 - 2300 1.50 CASING P 13,699.00 OTHCMP LAY OUT PERF GUNS IN PIPE SHED 2300 - 0000 1.00 CASING P 13,699.00 OTHCMP PICK UP PERF GUNS TO 350'MD AT MIDNIGHT _ -SEE DETAILS IN NEXT_ TIME ENTRY 7/25/2019 00:00 - 02:30 2.50 CASING P _ 13,699.00 OTHCMP RUN IN THE HOLE WITH 2-7/8" PERFORATING GUNS TO 2457' MD - PICK UP PERFORATING GUNS PER HALLIBURTON TCP - PU 58 KBLS, SO 58 KLBS AT 2457' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT SEAWATER I_WOUT=B.S PPG _ 02:30 - 06:00 3.50 CASING P 13,699.00 RUN IN THE HOLE WITH 2-7/8" PERFORATING GUNS ON 2-7/8" PAC PIPE FROM 2457' MD TO 4031' MD - PU 70 KBLS, $0 70 KLBS AT 4031' MD - MONITOR WELL WITH HOLE FILL AND TRIP TANK: GOOD DISPLACEMENT SEAWATER IN/OUT =8.5 PPG 06:00 - 12:30 6.50 CASING P 13,699.00 OTHCMP RUN IN THE HOLE ON 4" DP FROM 4031' MD TO THE 4-1/2" LINER LANDING COLLAR AT 13607' MD - TAG UP ON PLUGS AND PICK UP 27' TO _ _ _ _ SPACE OUT GUNS ON DEPT_ H 12:30 - 1300 0.50 CASING P 13,699.00 OTHCMP ACTIVATE PERF GUNS - SHUT IN WELL WITH ANNULAR, AND PRESSURE UP WELLT02300 PSI -BLEED PRESSURE - BOTTOM PERFS AT 13577' MD, TOP PERFS AT 11150' MD 2277' - OS TOTAL - INITIAL LOSS RATE -300 BPH 13:00 - 17.30 4.50 CASING P 13,699.00 OTHCMP PULL OUT OF THE HOLE ON ELEVATORS FROM 13607' MD TO 4031' MD - MONITOR WELL AT THE TOP OF THE PERFS FOR 10 MIN (-60 SPH LOSS RATE) - PU 176K, SO 110K, AT 11135' MD SIMOPS: - LAY DOWN STANDS OF 4" OP WHILE PULLING OUT OF THE HOLE 17'.30 - 19:30 2.00 CASING P 13,699.00 OTHCMP LAY DOWN 50 JOINTS OF PAC PIPE FROM 4031' MD TO 2457' MD -RIG UP DOYON DOUBLE STACK TONGS 19:30 - 00:00 4.50 CASING P 13,699.00 OTHCMP LAY DOWN PERF GUNS FROM 2457' MD TO SURFACE - ALL GUNS FIRED 7/26/2019 00:00 - 00:30 0.50 CASING P 13,699.00 OTHCMP FINISH LAYING DOWN GUNS Primed 8/5/2919 12:08:39PM "All depths reported in Drillers Depths" Common Well Name: L3-22 Event Type: COM- ONSHORE (CON) Lisburne North America - ALASKA - BP Operation Summary Report Start Date7/23/2019 Site: L3 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Hrs Task Code (hr) 00:30 - 02:30 2.00 RUNCOM P End Date: 7/27/2019 Page 4 of 6 AFE No X3-019CC-C:(3,937,060.00) Rig Release: 7/27/2019 BPUOI: USA00001272 NPT Total Depth Phase Description of Operations (usft) 0230 - 0600 3.50 CASING N 13,699.00 RUNCMP RIG UP TO RUN 4-1/2" COMPLETION TUBING -TORQUE TURN ON DOUBLE STACK TONGS, '- NOTIFY CAMERON REP, CAMERON REP CHANGE DIES IN TONGS - ELEVATORS AND AIR SLIPS - REMOVE PERF GUNS FROM PIPE SHED CONFIRMED ALL LOCK DOWN SCREWS - LAY OUT COMPLETION EQUIPMENT IN PIPE SHED --50 BPH LOSS RATE - UNABLE TO PULL WEAR BUSHING WITH -ATTEMPT TO PULL WEAR BUSHING WITH NO SUCCESS Printed 8/5/2019 12:08:39PM "All depths reported in Drillers Depths'" WBS:RUNCMP 0230 - 0600 3.50 CASING N 13,699.00 RUNCMP TROUBLESHOOT TEST PLUG '- NOTIFY CAMERON REP, CAMERON REP INSPECTED LOCK DOWN SCREWS AND CONFIRMED ALL LOCK DOWN SCREWS 'WERE FULLY RETRACTED - UNABLE TO PULL WEAR BUSHING WITH HOIST, LATCH UP ELEVATORS ON DPAND PULL 25 KLBS WITH NO SUCCESS - NOTIFY WOS AND ODE --MOBILIZE NEW WEAR BUSHING PULLER TO :THE RIG '- INSTALL NEW WEAR BUSHING PULLERAND PULL 35K TO UNSEAT WEAR BUSHING, OBSERVE DAMAGE ON OUTSIDE OF WEAR RIG - ^50 BPH LOSS RATE SIMOPS: - LAY DOWN STANDS OF 4" DP WITH OFFLINE _ EQUIPMENT 06:00 - 21:00 15.00 CASING P 13,699.00 RUNCMP RUN 4-1/2", 12.6#, 13CR-85, VAMTOP TUBING TO SET DEPTH AT 9694' MD - TAG NO-GO WITH 10KAT 9699' MD, PICK UP ORIENT PIPE 180"AND TAG IN SAME SPOT - SPACE OUT AND LAND TUBING AT 9694'MD (6' INTO PBR), NO ISSUES LANDING TUBING HANGER - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE TURN CONNECTIONS TO 4440 FT -LBS - FINAL PU 137K, SO 116K - PARKER 272 BLOCK WEIGHT 35K - 8.5 PPG SEAWATER IN/OUT --50 BPH LOSS RATE SIMOPS: - LAY DOWN STANDS OF 4" DP WITH OFFLINE EQUIPMENT 21:00 - '21:30 0.50 CASING P 13,699.00 RUNCMP CAMERON REP ON LOCATION TO RUN IN LOCK DOWN SCREWS - RUN IN ALL BUT THE 4 LDS USED TO LOCK DOWN THE WEAR BUSHING -RIG UP TESTING EQUIPMENT TO PRESSURE TEST TUBING HANGER FROM ABOVE Printed 8/5/2019 12:08:39PM "All depths reported in Drillers Depths'" North America - ALASKA - BP Operation Summary Report Page 5 of 6 Common Well Name: 13-22 AFE No Event Type. COM- ONSHORE (CON) Start Dale. 7/23/2019 End Dale: 7/27/2019 X3-019CC-C: (3,937,060.00) Project: Lisburne Site: L3 - TEST PER OCN #6 TO ENSURE HANGER Rig Name/No.: PARKER 272 Spud Date/Tima: 11/4/1986 12:00:OOAM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. SEALS ARE NOT DAMAGED PRIOR TO BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _. .. _ _ (usft) _ 21:30 - 2200 0.50 CASING P 13,699.00 RUNCMP PRESSURE TEST TUBING HANGER SEALS Printed 8/5J2019 12'.08 39PM **All depths reported in Drillers Depths" FROM ABOVE TO 4500 PSI FOR 15 MIN (PASS) - TEST PER OCN #6 TO ENSURE HANGER SEALS ARE NOT DAMAGED PRIOR TO SETTING PACKER _ -TESTAPPROVED BY WSUP 22:00 - 00:00 2.00 CASING P 13,699.00 RUNCMP REVERSE CIRCULATE COMPLETION FLUIDS AS FOLLOWS: - 4 BPM, 500 PSI -154 BBL OF 120° CLEAN 3% KCL - 182 BBL OF 120° INHIBITED 3% KCL, LEAVES INHIBITED FLUID SHORT OF PACKER BUT HAS ENOUGH CONCENTRATION TO TREAT FULLANNULAR VOLUME BETWEEN SHEAR VALVE AND PACKER 220 BBL OF 120* CLEAN 3% KCL i- PUMPAN ADDITIONAL S BBL THEN PUMPS ' 6BL DOWN TUBING TO WASH RHC SEAT 7/27/2019 0000 - 01:00 1.00 CASING P 13,699.00 RUNCMP FINISH REVERSE CIRCULATING COMPLETION FLUIDS _ 01:00 - 03:00 2.00 CASING P 13,699.00 RUNCMP SET PACKER AND TEST TUBING AND IATO .3500 PSI HIGH FOR 30 MIN EACH - DROP BALL AND ROD .- ALLOW BALLAND ROD TO FALLTO RHC -M - PRESSURE TEST TUBING TO 3500 PSI (GOOD TEST) - OBSERVE INDICATION OF PACKER SETTING WHILE APPLYING PRESSURE TO TUBING AND LOSSES STOPPED - BLEED TUBING PRESSURE TO 2500 PSI PRESSURE TEST IATO 3500 PSI (GOOD TEST) - TESTS APPROVED BY WSUP - BLEED TUBING PRESSURE TO SHEAR VALVE IN GLM #6 - VALVE SHEARED WITH -2900 PSI DIFFERENTIAL - LINE UP AND PUMP BOTH WAYS WITH 2 BPM 200 PSI _ 03:00 - 03:30 0.50 CASING P 13,699.00 RUNCMP SETAND TEST TWC FROM BELOW 7O 3500 PSI - CAMERON REP ON LOCATION TO DRYROD IN TWC WBS RIGID 0330 - 0530 2.00 BOPSUR P 13,699.00 RUNCMP NIPPLE DOWN BOP STACK AND HIGH PRESSURE RISERS 05:30 - 06:00 O.SO BOPSUR P 13,699.00 RUNCMP CLEAN OUT HANGER PROFILE AND INSPECT AND RUN IN THE 4 LDS USED TO LOCK _ DOWN THE WEAR BUSHING 06:00 - 0700 1.00 BOPSUR P 13,699.00 RUNCMP NIPPLE UP THE ADAPTER FLANGE AND DRY HOLE TREE - TORQUE TO SPEC Printed 8/5J2019 12'.08 39PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. 13-22 AFE No Event Type: COM- ONSHORE (CON) Start Date. 7/23/2019 End Date: 7/27/2019 X3-019CC-C: (3,937,060.00 ) Project: Lisburne Site: L3 Page 6 of 6 Rig Name/No.: PARKER 272 Spud Daterrime: 11/411986 12:00:00AM Rig Release: 7/27/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001272 Active datum: ACTUAL KB P272 @68.31 usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft _-_ 07:00 - 10:00 3.00 BOPSUR P 13,699.00 RUNCMP PRESSURE TEST HANGER VOID 704500 PSI FOR 15 MIN (PASS) - TESTAPPROVED BY WSUP - PRESSURE TEST TREE TO 4500 PSI (VISUAL LEAK TIGHT) - SECURE WELL HOUSE SIMOPS: -GENERAL RIG DOWN Printed 8/5/2019 12:08:39PM "All depths reported in Drillers Depths" Sri Y CO Q � J a � Q u E it a N M t0 M ♦/� V/ r N N 0 7 N N N N N 6I y _ Z J J J -i LO O LL \ \ z' CO � \ }/ ` z' CO � z' CO !2| z' !2| \ ) ` ) ) . — ` | . — §! o P m N N n n'm N m e m w P w m o 0 0 0 o N n m W o N N o m m N m N m in m 0 0 0 0 0 O o 0 0 0 0 7 7 7„ 7„ ry N a H u mm � � O O N N U O O O O O O O O O O C7 O O O O O N O O O O O C O C O g m a � d n n d d d N Z a Q N n 0 N 0 0 W O N m 0 n 0 n Q 0 m 0 O O P 0 r P W m N w w O m b P N N Y W [O tG W N W b w m m 10 N VI N P P N N P P Q' J J jQ Q j� C O O Ot O O O W O w O w OCL w W O W O W O w O w O W O w O w O w O p O 0 3 a< M w w— O W P 0 O O N O m Q N P b N n O N b 0 m N m m m n m m m 0 O Q m Q N N O m m M 0 r N n m P N m 0 O P O W b N n d 9 w W W OI W p w W W w m m W 0 0 0 0 0 m 0 m � o Z N N N N N N N N N N N N 0 m N 0 N N N N C d q d G q U U L a o 0 __ C d d U Cd H 9 C co_ co_ O W b 0 0 N M m N P O O N w n m p u- m E 0 0 0 0 0 o c o 0 0 0 J F i 2 m Q w U ++ � c d rc tt LL LL W++ O n, N W O g g O O o IC O OO 0 O N O O N0 G N 0 O 0 0 0 0 W Cl N N m N 0 CI 0 M w til m 0 P P n P w W 0 r N N 0 �9 a 9 7 7 7 IL d w m � U QV C j 0 0 0 0 0 0 0 o w m w w w w m w w m W m ¢ Z+ o o ti d o d o di w w m di ai ai di ai ai of w "� E .- a _ o n 0 M l`9 1'J W l7 17 0 0 0 0 0 O M O 0 o w o m w N W N w N w N w N m N P O O [Ny O CI O Q O N O 0 O n O 0 O w O O O O N O 0 O P O N O 0 O n O 0 O W pN E 0 T m O O 0 w 0 0 0 O O N m m 0 0 0 m Q Q Q o N o m w e W n N P o N o n O vi N e o O b n Q OI ro m W n w n W 8 m N CNI NN 0 � N N N N N N N N N J J m a w r 00 0 m' N 0 0 0 N N r O W 0 0 n N 0 n Hl O O O O O O O O O O O O O O O O O O O O 5 .haao '� o ovoi Nm C d Qd H= m w w m QQ j N N Z d N N N Z J J J J J 00 m m m W m m n n �n N m m n i+� n n iro m m m b Q E o ry m o a ai ai ai di m ae ai m ai di ai m 0 ai of m of ac Q Q N m o P Of O N o 0 0 P 0 N 0 m 0 r 0 m 0 w O O o O N O o O e O N O m O n O 0 O W N a 0O d O C E o m m 0 Z Z U a O N wo v m o o m P v m N N N N O � N Cj m (pp f pj p1 OI 10 Oj a N 0 n lV 4 4 m O m O N 4 n W m N N � w O m m •' N N CY W P 4 b N m n J N w i pm O O N U O O O O O O O O Z N m O j O � 0 N � 0 N N � n n m a s m m 2 m b N m b 4 C! wN n w N m o 4 m 4 W m m o m W 0 o W w O N P W n w O W Q m m O N b b O w N m P YI m 0 m o 10 N w n m M w n 0 m w 7 0 P Y Y U Y 0Qj W p b h M pi O t7 O r h N � YI CM h N Rl r N 0 4 0 Q lNy Q Q ? N C O O O O O O O O O N M m 0 H N N m Ol V V N 100 t4O � r m l�1 n n n r r n n n n n r r n r r n n r r n n n n n n n n Q w W N Q N N 0 O b N 4 n 0 n N 4 M 4 m O N m W � W 0 n W O^ Yl N w m CJ w m 4 n M w ID w M w 0 m 4 [O Nw N O m W w P O Q 4 0 O N n 0 O m N w N b 0 0 0 4 4 V P 4 w w Nf (h M (V O to Oi 4 W P 0 t7 A i(1 t+l lV Oi (p N 01 O y w W 0 0 0 0 0 m 0 0 N n ! n P m P 0 Q m Q Yf Q 4 4 p 4 w 4 0 4 N 0 N Q N P N 4 4 4 4 O Q t m m W m m m w ro m C0 W m m b m b m m w m w m W m w b w b m b m m w m w m m t0 W m w m m m m 0 w 0 w m m C O c d u m y C C y O 4 O m w O m m m 0 n O O W N W N Cf W w 0 p m N N M N O O W w N w N N Vp d _U P � N7 O O N N N O 01 0 N 0 P W 4 O m m � r OI wm. 7 n^ N N O 4 O m m 0 Q 0 Q m 0 0 N m n m N w n Q lh O w m 4 w O w m m r p_ N 1� m n n n 0 n n n N tq m 0 N W 4 7 1lI 0 O) m t7 m oD 4 4 r C r b 0 0 O m n Q 0 0 r P C] w m w 4 r O M Of N N N q v m m b n n m m m 01 w O IL N C J m G_ V" m N W p p m m 4 r 4 w M W m w W 4 w N m N W W Orl m W Of 0 m 0 P In O P t"f 0 N N m m m m N b W mm OWl � M hmJ Cwl � CWI CWl C09 m M Ol N N m O N n m V N � n N Q m N N O N N N N m N 4 N m N m N r 0 m O N m 4 m m m n 0 w 0 4 N w a Y O d 17 CI 4 4 Q P d W W 0 0 n m m N m m m 0 m O P O m Q P m O m m N w Q 0 N N N N N N N N 0 n m Q n n N N m w W 0 N W N 4 m m 0 m m m 0 0 0 n r m w O N m N N O m W W m W 4 m O O O O N O w O P O N O m O r O m O w O O O O N O ty m CI m P 0 N n m m n 4 0 W W O O q f m Q N i+1 o o m W m o N 0 e 0 w 0 m m � 0 r m 0 W � m w o 4 0 N m m D n o o, a1 o N m m m a m 0 0 0 N n N n O O O N m N m N 0 n W n M N m n Cl r CI 0 0 n N N w (y m O N 0 ^ m O m O n O W N 4 N Q O O O C C OO OO � Ci 1A 0 O M 0 m N N N M M M p p pn N t7 th ty CI n � = V E m E 0 p N N N O Z J J J J J m m 1n m m m m co m m In m m m m m m m m m m m m m m m m 4 O 00 O O 0 O 0 O 0 O m O m O . O a O m O m O at O 0 O 0 O . O 0 O 0 O 0 O 0 O 0 O 01 O m O m O m O 0 O 0 O p Q G� O N N N N w N 4 N N N m N n N 0 N m N O w m N m M m Q 0 N w 0 6 n t7 m Ol m 1+f O O 4 N Q N Q 4 4 N 4 0 4 � di 0 O C T U ue N?v Ti O m ei r 0 i O N m CJ W m w W m n N n m m m P m m n O m N m n m N m 10 l7 W f0 P N Oi 0 n A A n m di W N< N Ih m O n m m W w 0 N N w W e Nm m m n m m W O O N m � � � � � '. r �- N N N N N N i d pU O C T 0a m33m" y N m n @ n O N @ m W Q m n @ m N n O O n m @ W m O N@ m n m OO r N CI Cl Y Q V V C! N r OI 0 �p t7 Ol 1� O N @ m m m n m W O O N N Q Q m m n m m W O N N CI @ m @@@ Q@@ P N m m m m m m m m m m W N m m m m m m m m W O m n O m m n m N n O P m m N O m m O m n m N m Q N m O C Q Q Q Q Q Q Q m N N N m N m m m m m m m m m m m m m m z� O 0 0 O o o O coo 0 m N 0 o o 0 0 0 m m W A e N n m m O W n O O O m N N N N m m N m m O m O m m m W m W P m n W n m m N N m Q Q Q m O M m m O m W W O N n A A m m m m n of n n m m m m m w m n n w w o; e; 9 m m ai m m ae ae ae m m m m m is di of di ai m m m m m m m ad m O O O O O O O O O O O O O O O O O O O O O O O O O O O m W O N m Q m m n m w O N W Q m m n m W O N N v N 65 N N m W m m m m N N m m P W O N om'f O N N N m m N m N N N U d U CN g W Q O O Q! W Cl IN W 0 W m m W V m m 0 m m fG n N n n m N W n m N m n Q e N at 0 0 0 0 0 0 > > Q m �� f P l7 M (7 W w CJ M w t'7 CN, f ' N N N C W •E d Y m w m m m m m m m � m m m a m m �i m W �i m w m W w m O' 0 j 00 id W m W _ b � O m " O U C d A C! @@ a M M m d � Y O N P Q N n n O_ O' N f m' Q m N w `_ ' w w O m m m 2 O a m n Q n Q Q N m N n W W O O N m m W W O m N H W W N W n N l7 N N O W n N N W m W W O O m m W n W W W N w O N W w N m n m O N W n Q n m N Q O Q O Q A N m p m W W VI n W w W O YI W n W N CJ W m O m n m W Cf A n W W N` m P O n m 0 of m N W t7 0 N �^ N m O Q W Q m m 0 W n n A w tG W 7 . . . . . . . . . N N N N N N N N N N N til Cd Y d pU O C T 0a m33m" y N m n @ n O N @ m W Q m n @ m N n O O n m @ W m O N@ m n m OO r N CI Cl Y Q V V C! N r OI 0 �p t7 Ol 1� O N @ m m m n m W O O N N Q Q m m n m m W O N N CI @ m @@@ Q@@ P N m m m m m m m m m m W N m m m m m m m m W O m n O m m n m N n O P m m N O m m O m n m N m Q N m O C Q Q Q Q Q Q Q m N N N m N m m m m m m m m m m m m m m z� O 0 0 O o o O coo 0 m N 0 o o 0 0 0 m m W A e N n m m O W n O O O m N N N N m m N m m O m O m m m W m W P m n W n m m N N m Q Q Q m O M m m O m W W O N n A A m m m m n of n n m m m m m w m n n w w o; e; 9 m m ai m m ae ae ae m m m m m is di of di ai m m m m m m m ad m O O O O O O O O O O O O O O O O O O O O O O O O O O O m W O N m Q m m n m w O N W Q m m n m W O N N v N 65 N m m m m m Q n W w t7 N N O m m m w W N W d U CN g W Q O O Q! W Cl IN W 0 W m m W V m m 0 m m fG n N n n m N W n m N m n Q e N at O PJ Ol C1 1A � O N Q N_ n N_ 01 N_ �� f P l7 M (7 W w CJ M w t'7 CN, f ' N N N N . •E d Y m w m m m m m m m � m m m a m m �i m W �i m w m W w m Ce W id m m m id W m W _ O U C d A C! M M m O N P Q N n n O_ O' N f m' Q m N w `_ ' w w O m j>m> d F S z m G W N w O A m W w N m n m O N W n Q n m N Q O Q O Q A N m p m W W VI n W w W O YI W n W N O m m N O m m O Cf A N N n N N m W W H Q OI Q N m m W m m VI n 0 of m N W t7 0 N �^ N m O Q W Q m m 0 W n n A w tG W 7 . . . . . . . . . N N N N N N N N N N N til Cd Y d pU O C T 0a m33m" y N m n @ n O N @ m W Q m n @ m N n O O n m @ W m O N@ m n m OO r N CI Cl Y Q V V C! N r OI 0 �p t7 Ol 1� O N @ m m m n m W O O N N Q Q m m n m m W O N N CI @ m @@@ Q@@ P N m m m m m m m m m m W N m m m m m m m m W O m n O m m n m N n O P m m N O m m O m n m N m Q N m O C Q Q Q Q Q Q Q m N N N m N m m m m m m m m m m m m m m z� O 0 0 O o o O coo 0 m N 0 o o 0 0 0 m m W A e N n m m O W n O O O m N N N N m m N m m O m O m m m W m W P m n W n m m N N m Q Q Q m O M m m O m W W O N n A A m m m m n of n n m m m m m w m n n w w o; e; 9 m m ai m m ae ae ae m m m m m is di of di ai m m m m m m m ad m O O O O O O O O O O O O O O O O O O O O O O O O O O O m W O N m Q m m n m w O N W Q m m n m W O N N v N 65 N N W O _ N m f m W m O W N m m f m w m N W n r b W Q N n w Q N N n Q O Wm m m CO N W p CO m m m N N N N w imp p N p O N � O P N _ N� N N N N (V N N N N N N Cl t7 Ol CI M (7 m m m t7 m CI m S p N d Q N m m m O N P n b m m m O o W W n m r p m n m m m 0 o O O N m m m m Q N m P W m Q i n o g s s m U a w mm 0 o' m N U m O Cdj � a v m = a a s m m m o m N N Q r m N m m O m Q m n n m N w o r ? a f m O N w O N N m N m P m N m N W N w n m w m O m m Ip O W N m N Q m n m O m i(f Q n O W m m w O N Y Y U ' P ut 0 0 Oi (G I� N t7 Cf N w b m m r Cl n 0 b P N J J Y Q a j N W Oi C Q N N fp n b m n W r N m 0 n W N O n O N m N m N O m Q m m m Q N P m P N N N m N Q Q F W y N m m r N N O p m b r w Q m W m m m m m m O m b m b O p m m N Q Cl rC N m m w O n m Q O N m N m m b N W m N W w O til b 0 N w W uN y W N N p m m th Nl N (O m O O m W P m^ Q P m P N N Q N m m N W W m m R m N r P r m C 0 0 O O O d O= m (a O m w m w m w b w m w m w m w (O w m m m w b m m w b w m m m m m m m m m � w w w w w m W m N N N N N N N N N N N m «d O m 'L ` C O d V m O p y T m w m N Q N r N l7 m 01 m N n m m m W m W O m O O N w m Cl! r N O m Q m n m O Q Q N Q N N N N N N N N N N N m l7 m m m m (7 l7 N t7 CI Ol M r o w o N N o N n m r n N w m pOf N p N N O w m n n W O n N m b W m m N n Q m O N m p N N m r m W N m P N m m W N P Q P IL m iy w Q O b m m Q N m O N w r m m m m O a O m O O m CI w n p m Q A m m N m O W m N Q w m b Of OI m 0 P ^ N �p O IG m m m m Q O m N O QI m N n th m N N N Q M m VI N (p Oi O lV O ��pp d� V O p d N m r mw w O N N Q Q N m n m w O � N m m P P W ro ro di m m O r N m m r b W mp w N mN Q O m n p Ol n N O N W m m 0 m m m C t") p N m m N m N nn r N m p Q W n m m W O N N m p N m n m W O O N m Q P N FS ?. N N Q b r m n W w O Q w N W N n O p m m m m m m dt 0 0 0 mi Cl M m N t7 N r W N (� Q h N O w w w m m w w w w o 0 0 0 0 0 0 0 L a m m N O n N P m m m O N n n m N W O m m N a m m m n n m m N m O O W m m �p N Cl m N N O w w lh m m m m el m m m m m N N N N N N N N N N N N V E { L N N N ; Z 3 J J J J O � D t0 m m 0 b tG OJ Ol m 0 0 b b b m m m 0 0 QI QI tG m Oj d Ih C m O C T C y L w d C n W O b w W b P N m m n n W mpy P�1pp m P m W W O m m C P V O Y Y O Y m N b N tOO N fO fp m I� n n m 0 m 0 7 $ C ci �+i m m m of m M ri ri ei m m ri ri m ni m m ci ei m m m m �b a b y ul M a m n o m n o N m e W p n m m a N � Z 0 � w 2 Q m m M m w m N m O Q p o rn o W' n m m N n m m P W Q n N m fS Q Q m n n n n 0 0 0 0 W W 0 O O U U 2 E `- ¢ ¢ w w p m N o m m m n m m a a m w o m e o n m Q m O W n m P n m m b N n m b m W N N m m P O n O b O n n m n W 0 O n N P m 0 b p m m O W P P O W m N N O W W 0 0 n b Q P m N N N O O O O_ W W W co W C w W O W O W O w O W O W O W O W O W O W O W O W O d m fp m m m m m m m m m m m b b 0 m m w m m m a � O= w w W w m m W m W W W W w W w w m W w w W W d O Z m w m N m m N m w . N m . m 0 m m b 0 m m m m b m N d 'L E C � V d O yd. d d U y m p m n m O m m m 0 W P m 0 O m m 0 O m m 0 m m of of M ri ri m ei m m of of ri of ei ei m m of m m of 0 0 0 n Z W D w m N n W n n o m N 0 m N O m P n 0 N W Q m QJ W m O m m W b N 0 N n 0 m N 0 b O m O m W p 0 0 N VI m m n n 0 0 0 O O m b m Q 0 b m n n m m 0 W W m m 0 VI m (ff m m 0 b� m� 10 � tQ tQ m m m IL M 2 J ` m c �y l7 m O w O mN n W m W w N m 0 W p N O p n n m m P Q n p N m O 0 W 'O m m P m N N P m N 0 b W m n W n fp t7 (V Oi m Cl m f O IA ry tC m (M O W 1� O C (O n d O e b 0 m m b 0 0 n n n 0 0 m m W W W W W W O O W Q n n O n m m m O N m 0 n m m n W m 0 N 0 m W 0 m W mm N m m n m O n m n 0 n 0 n O 0 0 0 0 W m W m W m 0 w W O m O Q O w O n O m O m m 0 0 0 0 m 0 0 0 0 0 0 0 0 m 0 m W W W W W W Fi E N n N w n O m m m W n n W m n N 0 O m P m P N m Q m CI N Q N b m m N W 0 n m m N 0 0 0 W m n a m N m O N n m m p N N N N m' Q W O N 0 W N N N m p N m m m p n P W p P m m W N N N N N N m m m m m m m m p p p m w 0 0 w m m n g u — d ¢ C J ¢ E E E E_ E N N r{ m O N n m m b m m P m n m m 0 g W N P n o n m m N N Q 0 m m m 0 O N N N P O Q m W O N Ol V N 0 Oi O l7 (V n 0 OO N m m A O b O N m m O O m O 0 p n O m n O O m n O' m 0 m m W N 0 p 0 6 m 6 m E" I� n n 0 0 m W 0 O O O N N N m m N m of m of ai of ai 0 0 0 0 0 0 0 0 0 0 0 0 � a a m d o -. n n I W W p n N N Q n n N m W Q n W w m't W N 6 W W O M M $$ W N YWI W^ N W W p n O m m O W N 0 N Q O m W W W M W O O D r N N N M M Q N N N m b W n n n m m H c .. 4 y Q C T E va`i'n33c w' (D N O QpQ m m O m w N w m m Q w O n N O m Q N m m o O O O O$$m m CNl N N N O N VI N Vl n G IA w n IN S O O O O O W Omi $0 mw 0 0 m w a w ai m a di m of w W di m of ro m m ai m m ae ro ro ro m m W N N m m W N m m m n O $ N m N m m N N m W N m O O m N m n m w Q m m N n O N M m n N Q N N O N m N N N Q n O N w Q m Q m M w N m w W m Q w m m m W m m m O� of ai ai m di mi di a O, ai ai m of of m of m m m m m m m m ri ro m z� 6 = m N N N n Q N m m m m N O m N n$ Q m Q N m O m m N N Q M N O m m n n m m 0 10 O C CI C 01 m m n m m Q m w m m m m m m m m m m m m m m m m m n n n n n n n Q w N m m n WQ N m w' m m a N O p N N m n n w N W n N m n N O N N N O O N Q N O w N m O m N M W N N m O N W W W m O W O Q m m N N n O W W O w w n N W W O Q M N N W n n N W M m n m N Q N n N M Q O f0 A b C N Q m t0 Oi O O N V Q W t7 at b O N M m n at O N Y O p N p n O M W w M W W N n O P n O M W W m m VI N b W W W n n n WW O O N N N N M M f V m N f m N O M n N n n W m m m O Q N m m n m N O n d J w n Q m rW N m N n O N N n n n m O N N m N N 2 m n W w m w w w N w w w w O O O O m N w Q Q N N m n m m W � o c Oct m m m W m m m m m m w w c m o W o c w o m 0 w 0 w 0 w 0 m in W W 0 0 W 0 w 0 w 0 vy m m m m m m m m m m m m m m m m m m m m m m m m m m � o .m'.. w w w m w w Wm W W W m m w W w w w m m W rc m w w w w w p Z N N N N N m N N N N m N N N N N N N � m N N N m N N N N d O a s 1p m o m N a w N o N m m m a n m oy N a N o M o (mp � n n c m m N N a m a m m w m N m m W W N m 0] m Y Q m w w Q m w N N o m m N m mm N m w N J J rC N C m O w' O N m Q N N m N w Q w n w OM Q Q W Q m n m m W N N m O w n O M b w ¢¢ Q n N N N N N N N N Cr tV N N N Q lV N Cr n n N N n N W N m N m N W N w N w (V w N N m m m Q N m m m m n n n m m m LL' d L d S] m Z 22 m Q Q O Q Q Q Q Q ¢ ¢ f W W Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q O O C Z 9 C H c .. 4 y Q C T E va`i'n33c w' (D N O QpQ m m O m w N w m m Q w O n N O m Q N m m o O O O O$$m m CNl N N N O N VI N Vl n G IA w n IN S O O O O O W Omi $0 mw 0 0 m w a w ai m a di m of w W di m of ro m m ai m m ae ro ro ro m m W N N m m W N m m m n O $ N m N m m N N m W N m O O m N m n m w Q m m N n O N M m n N Q N N O N m N N N Q n O N w Q m Q m M w N m w W m Q w m m m W m m m O� of ai ai m di mi di a O, ai ai m of of m of m m m m m m m m ri ro m z� 6 = m N N N n Q N m m m m N O m N n$ Q m Q N m O m m N N Q M N O m m n n m m 0 10 O C CI C 01 m m n m m Q m w m m m m m m m m m m m m m m m m m n n n n n n n Q w N m m n WQ N m w' m m a N O p N N m n n w N W n N m n N O N N N O O N Q N O w N m O m N M W N N m O N W W W m O W O Q m m N N n O W W O w w n N W W O Q M N N W n n N W M m n m N Q N n N M Q O f0 A b C N Q m t0 Oi O O N V Q W t7 at b O N M m n at O N Y O p N p n O M W w M W W N n O P n O M W W m m VI N b W W W n n n WW O O N N N N M M f V N N N O Q m O w e m Q m N N w m N O Q m m O W J w n Q m rW N m N n O N N n n n m O N N m N N O m n W w m w w w N w w w w O O O O m N w Q Q N N m n m m W � o c Oct m m m W m m m m m m w w c m o W o c w o m 0 w 0 w 0 w 0 m 0 W W 0 0 W 0 w 0 w 0 vy m m m m m m m m m m m m m m m m m m m m m m m m m m � o .m'.. w w w m w w Wm W W W m m w W w w w m m m w w w w w p Z N N N N N m N N N N m N N N N N N N N N N N m N N N N d O o u o v c m m N N a m a m m w m N m m W W N m m m Q m w w Q m w N N o m m N m mm N m w n m m m O d U Q n O Q n O m fp w N N m Q n m N O m m m N m m m w Q F 4 d V d R' T OI w O O O0 N N m m m Q N m m m m n n n m m m LL' d L d S] m Z 22 m Q Q O Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q O O C Z 9 C H > OI m n N O N m O m w m Q O Q n W m w m m m Q O O O w 0T W m tP n fSl n m m N N O Q 0 m 9 N tsl m C c .. 4 y Q C T E va`i'n33c w' (D N O QpQ m m O m w N w m m Q w O n N O m Q N m m o O O O O$$m m CNl N N N O N VI N Vl n G IA w n IN S O O O O O W Omi $0 mw 0 0 m w a w ai m a di m of w W di m of ro m m ai m m ae ro ro ro m m W N N m m W N m m m n O $ N m N m m N N m W N m O O m N m n m w Q m m N n O N M m n N Q N N O N m N N N Q n O N w Q m Q m M w N m w W m Q w m m m W m m m O� of ai ai m di mi di a O, ai ai m of of m of m m m m m m m m ri ro m z� 6 = m N N N n Q N m m m m N O m N n$ Q m Q N m O m m N N Q M N O m m n n m m 0 10 O C CI C 01 m m n m m Q m w m m m m m m m m m m m m m m m m m n n n n n n n Q w N m m n WQ N m w' m m a N O p N N m n n w N W n N m n N O N N N O O N Q N O w N m O m N M W N N m O N W W W m O W O Q m m N N n O W W O w w n N W W O Q M N N W n n N W M m n m N Q N n N M Q O f0 A b C N Q m t0 Oi O O N V Q W t7 at b O N M m n at O N Y O p N p n O M W w M W W N n O P n O M W W m m VI N b W W W n n n WW O O N N N N M M f V PRO Q b N W m N W O f0 r W m W W' m A w n N W W m W m n m W n m O m W n A OI b W m m W A m b A m W O A Q W n N m W W W O N W P m b n A W W W W O O O lV (y � Q Q Q Q m N N b N h N m N b m m b Y1 m m b b W m fp fG fp O y y W o o W N b o n w m Q N m o W o m W W n N m m n m w A m o m m w m m m m m m m m m m m m m m m m m m m m A n A A A A n n A m m 0 m 0 0 m 0 m m 0 m m m 0 l m m 0 W p) m 0 0 m pl m O N O N m A m O m W m m w N O Q O N O m m W m m O p N m O Q W m W P N m m W m A O O W Q W P m W W W W m m m A A n n m m m m m m m m m m m 0 W m m m m m m m m m m m m m m m m m m m m m m m m m m m b tll m m m 0 OJ N m m 0 1 0 0 0 (C Ol m 0 0 m LLt O m N m m N m m O N W P N A m m O m m m O W w W m m m P N m Q m m n n m m m Q N O W W O O m m m m m n A A A n A A n n n n A A n n A A n m W A A m m m W m m o m N w o m m a m' m m m n A m m b m Q N 10 m b e m o 0 0 0 0 o w u> m m m ry o O m b 1D m m m m m m b b O N W W b m P W m m A W n m N m Q P b N N m m N O b w Q O N P N N W W m P Q O P W m N n b P W b n n N w b O b O b w m w N fp n m C N m b A W O R Q Q b w A n n w m O N m P P Q b b m m m m n n Aw m N m P P n P o n m m m A n o m m m 0 N m m m m n a a a w N m O o m A �n n m N m W n ry Q n m Q m m m p Q n m A m m cV m Q m A m N m m C m L C O O O O O _ N N N N mm m m- z m w w Q Q 'mm m mmmmm m m m m m m m m m m m m m > > ¢ W n m m m m m m 0 m W 0 2 m m m vi m m m m m m m m m m m m m w m 0 J op m m m m m m m m C mm O v m � P o Q n m P m n r Q N m n m m O m m b m Q b m W m C Q i d A O m N N O P N Q w Q m Q m M N N m m v q Q 1� w w N m m A N w n m m 0 m f0 r m n m m O (D O Vl O CI n r W W a s W W O m w N W N W m p O O O A w m m O m ¢ w m P N w m m N P m P m n A p P N O A N W m O m N m N P n O m P b b m Oi O N r Oi Oi Oi A A (p Ol Oi J J E N w NO m O m O � O N W N N w b m m A m m VI P N N N VI m O' m W N YI m m p m m m m M Ol O w A P w P mm m m A m W O O O N p w N N N m w _1 Ew m w m� m !+l Cl t7 m M t7 Cl OI th P P P P Q P P P P P O P ry w N N N m P.' n A A n A n A n n n A A A 3 < a w O y y W o o W N b o n w m Q N m o W o m W W n N m m n m w A m o m m w m m m m m m m m m m m m m m m m m m m m A n A A A A n n A m m 0 m 0 0 m 0 m m 0 m m m 0 l m m 0 W p) m 0 0 m pl m O N O N m A m O m W m m w N O Q O N O m m W m m O p N m O Q W m W P N m m W m A O O W Q W P m W W W W m m m A A n n m m m m m m m m m m m 0 W m m m m m m m m m m m m m m m m m m m m m m m m m m m b tll m m m 0 OJ N m m 0 1 0 0 0 (C Ol m 0 0 m LLt O m N m m N m m O N W P N A m m O m m m O W w W m m m P N m Q m m n n m m m Q N O W W O O m m m m m n A A A n A A n n n n A A n n A A n m W A A m m m W m m o m N w o m m a m' m m m n A m m b m Q N 10 m b e m o 0 0 0 0 o w u> m m m ry o O m b 1D m m m m m m b b O N W W b m P W m m A W n m N m Q P b N N m m N O b w Q O N P N N W W m P Q O P W m N n b P W b n n N w b O b O b w m w N fp n m C N m b A W O R Q Q b w A n n w m O N m P P Q b b m m m m n n Aw m m m w o w W P o w A A N m w N a W m n m a V w N m O o m m w NO N N w W w m m W m P w W W W n ry Q 0 W Q N b m N n m N m N o m io P P m m m Q w n m Q m A m N m m C m L C O O O O O _ N N N N mm m m- m m w w Q Q 'mm m mmmmm m m m m m m m m m m m m m m m m m m m m m 0 m W 0 2 m m m vi m m m m m m m m m m m m m m m m m m m m m m m C v m � P o Q n m P m n r Q N m n m m O m m b m Q b m W m C Q i d A O m N N O P N Q w Q m Q m M w Q 1� w w N m m A N w n m m 0 m f0 r m n m m O (D O Vl O CI n r W W m o n N A r o w w m o m n A w w m b m w o o m m w N w m b Q o m w n Q Q m o w m o m m p m m m m N O w A P w N W A m m m m m N p w N O m A m m w m� 10 10 m N m m m N Q P g v Q M (7 (7 ty w m m m ry N N N N m P.' O y y W o o W N b o n w m Q N m o W o m W W n N m m n m w A m o m m w m m m m m m m m m m m m m m m m m m m m A n A A A A n n A m m 0 m 0 0 m 0 m m 0 m m m 0 l m m 0 W p) m 0 0 m pl m O N O N m A m O m W m m w N O Q O N O m m W m m O p N m O Q W m W P N m m W m A O O W Q W P m W W W W m m m A A n n m m m m m m m m m m m 0 W m m m m m m m m m m m m m m m m m m m m m m m m m m m b tll m m m 0 OJ N m m 0 1 0 0 0 (C Ol m 0 0 m LLt O m N m m N m m O N W P N A m m O m m m O W w W m m m P N m Q m m n n m m m Q N O W W O O m m m m m n A A A n A A n n n n A A n n A A n m W A A m m m W m m o m N w o m m a m' m m m n A m m b m Q N 10 m b e m o 0 0 0 0 o w u> m m m ry o O m b 1D m m m m m m b b O N W W b m P W m m A W n m N m Q P b N N m m N O b w Q O N P N N W W m P Q O P W m N n b P W b n n N w b O b O b w m w N fp n m C N m b A W O R Q Q b w A n n w m O N m P P Q b b m m m m n n Aw M W Q N W m m O N N N IN O W m O m N N W W m m N P N P N m N m m m Q N W N n N r O m m m W N W N m Q Q n O N N mO o9 N m Q b Q n W N W N N N m m m l7 Q Q Q P N w m n n n m m W w � C .. Q y OC T o —e a m s c�a in33m w 3 1� m N m cm Y co Q M O O P N O m N N N P@@ P@@@@ @ Q@ Q Q @ P@ m M m m m m m m m m m m m m b m m m m m m n n n b N ON@ O r M n b n O m N m W O N b WN N b @ N b n n m m N N N N@ P Q @@@@@ P@@ P@ m b N r N W N W W m m b N m m m m m m m m m m m m m m m m m m m m m 0 P m Cl m m m O N O m W m n Q O N O O N M N b m W Cl n n n m m W N W p n o m m o N b w m m m n o m n b W m m m m W W O O O O N m@ N N N m m y N N m o'1 M M` M cf Ol M M M N 'Q a R a U N N m m O m m W O M N O . . @� m of � j o0 ac m p m� m b � 5 m Y m W N O n W Q m m m n m m m O n W A r o G F E w w aa @@ m n N o o m n o m m N m m N N m m m m a n m@ N W W N o I N N N W W m N N N m P n ('I N m m m W N N m W m m m$ r W N W N W n W m m O O i L L N N m mm m m m m w m m w m m m w w w m m m 2 N N N N N N m m. N N N m N N m N N N O 9 N m O m m m N m O N N @ W m C C U YI O ry N W W O m W m m P p 0 fp W W m m U O m W N V n W N@ n W N N t0 V n T P m d L 0 G u m> 02 C Z m m m m m m m m m m m m m m m m m m m J F? Z m O W J � N V N Oni N ONi W O Vml Y m N � r N C� Ci 0 N@ m m m VI r O r 0 w m O N@ m N ry O ry W n N m � W 1� IA m' N N n W N n m C 'z W W O b W W@ N n m m O M N@ N N @ m N m N O m N m m n m N N m m n n n n n n n n n n n n to n N n r Oim 0 m w r n n m n m n m n m n m n m n m n m n n m m n m n m n m n m n n m m 0 � m rm di C .. Q y OC T o —e a m s c�a in33m w 3 1� m N m cm Y co Q M O O P N O m N N N P@@ P@@@@ @ Q@ Q Q @ P@ m M m m m m m m m m m m m m b m m m m m m n n n b N ON@ O r M n b n O m N m W O N b WN N b @ N b n n m m N N N N@ P Q @@@@@ P@@ P@ m b N r N W N W W m m b N m m m m m m m m m m m m m m m m m m m m m 0 P m Cl m m m O N O m W m n Q O N O O N M N b m W Cl n n n m m W N W p n o m m o N b w m m m n o m n b W m m m m W W O O O O N m@ N N N m m y N N m o'1 M M` M cf Ol M M M N 'Q a R C) 0 LO North America - ALASKA - BP Lisburne L3 L3-22 L3 -22A L3 -22A 500292166301 AOGCC Offset Well Report 24 July, 2019 by Company: North America - ALASKA - BP Project: Lisburne Reference Site: L3 Site Error: 0.0ousft Reference Well: 1.3-22 Well Error: 0,00usft Reference Wellbore 1.3-22A Reference Design: 1.3-22A BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Output errors are at Database: Offset TVD Reference: Well L3.22 ACTUAL KB P272 @ 68.31 usft ACTUAL KB P272 @ 68.31 usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference 1.3-22A Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria (usft) Survey (Wellbore) Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 7/24/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 108.31 9,508.31 1 : Sperry -Sun BOSS gyro multi (1.3-22) BOSS -GYRO Sperry -Sun BOSS gyro multishot 9,528.00 9,650.48 Survey #1(1.3-22A) INC -TREND Inclinometer +known azi trend 9,681.16 9,912.47 Survey #2 (L3 -22A) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 10,007.86 13,699.00 Survey #3(L3 -22A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft( (usft) 04 04-22 - 04-22 - 04-22 10,970.88 12,893.00 405.14 L3 1.3-08 - 1.3-08 - L3-08 2,404.68 2,400.00 41061 1.3-10-1.3-10-1.3-10 1,396.99 1,400.00 368.45 1.3-11 - 1.3-11 - 1.3-11 2,387.26 2,375.00 32605 1.3-12 - 1.3-12 - 1.3-12 2,703.11 2,700.00 25740 1.3-15 - 1.315 - 1.3-15 917.32 900.00 23071 1.3-18 - 1.3-18 - 1.3-18 2,407.44 2,400.00 116.10 1319-13-19-L3-19 2,737.07 2,725.00 196.56 13-22 - L3-22 - 1.3-22 9,625.00 9,825.00 49.69 1.3 -22 -1.3 -22A -L3 -22A WP07 11,352.89 11,375.00 8.12 13-23 - 1.323 - 1.3-23 2,314.65 2,300.00 198.41 1.3-24-1.3-24-1.3-24 1,958.47 1,950.00 70.36 _325 - L3-25 - 1.3-25 325.63 325.00 230.84 _3-28 - L3-28 - 1.3-28 983.86 975.00 184.61 _330 - L3-30 - 1.3-30 3,365.54 3,350.00 212.31 13-31 - 1.3-31 - 1.3-31 2,442.78 2,425.00 378.77 1331 - 1.3-31 PB1 - 1.331 P01 2,442.78 2,425.00 378.77 72412019 10,07:21AM Page 2 of 2 COMPASS 5000.1 Build 81D m a w m � E D N X U � n' Q r N Y Y ❑ 0 J w a u E W q W � U O E g t i ❑ z °U' ¢ W � w S Z Y d D! m LL Q X O Y E � � ❑ E m i J o c N ry a M w C U m � � ❑ % � ❑ W O Y U o ° w z n U U o X m m c � p o N 8 ° � N a O N m W Q O 4 r n 0 a 0 N a O m O m g 5 v z E J O WE Y a z y Y y O U A ¢ Q I C :, I o y w � o E E a o E D N X U � W Q r N Y Y ❑ 0 J Z a u C W q W � O E g v ❑ ¢ W � y Z r O E � � ❑ E o c Y a s o y w ¢ `w E E a o E D N X U � y 0�aa 5 Q r N Y Y ❑ 0 J Z a u C W O O O g ¢ W � y 3 =O � E o Y v U _ ❑ % � ❑ W O Y U o ° w n U U o X m C O X p o a m � N i N a O O] 0 n 0 a 0 u > N o O m O m g 5 � o M E � n n o > N E o C % C ^ in o ❑ E ❑ W O € p � 6 � N o W U w > a y r n � v 0 a � a > 3 ❑ IL {L n ^ a m r � K tt o O J p m n a s p� 9 a o m o m F o o w ¢ `w E E a o 3 E N X U � y 0�aa 5 Q r N Y Y ❑ 0 N U r o =Y o n m n E J Z C W O O O g ¢ W 2 W 0 p =O � 1 U m❑ w U U X ❑ O X O 0 N N o O m O m g 5 Y 0 N C % C ^ ❑ E ❑ W O p n 0 > m � n a J p m n a s C � E � n c > u Eo o C ° > m o 4 N > 0 x N x � o m w w E v o y O N � m m m n m a n n c m 9 g m O m o o N U r o =Y o n m n E Z W O O g N U r o m n Z W O O 31 p E m m ; T O F- E z m n ^ m n ❑ O o N � U o r n E N W? C LL Q L EI m a a LL y d N n E J n Iry om oDa �E In O y 'a atm—p jDCu dp J O z z u a w U 7 � LD J W W d oa I m o t0 `- m o ^ o r d E p W E n m o LL F V> E t U L C o aN E E u m a z Iola U U m o p a4 d t O q O ¢ U n y n c i E J rn E z z n .- j d jp J 6 6 L � d E C N O yJj c U o dTZ l0 gi y E g v e a �y i L m d 0 a' 0 QY 6 m J _ ° F 8 C d C? C E oE_ E � � N o c m o! Qcm n� � yv h O y E o C m o g' n E U E a° z 1E -E U ._ .°. c N O N ¢ o a W m '2 C 0 m V E (^y 6 (n Od d K U N n 0 Y i n Z O w Q F Q W v Z o E LL J O Z d n d C ✓� c n D� m J~d o f y w w v 0 m a m 3 LL O o E ti ° m v 'o v m W w LL r O m nLL v C as«E n O o ° nx m Q O K y LL W a J v m p z W O d ¢ `d o E E E 1Z 2 n42 '- 'p o iJ w z a z z v Ci LL O C C E LL G JP d F K N z w1 G FmL V p E W m yYio n J m J d O J E a @ O b m c a 0 0 m c o'21.i o a r tymo „ d E a D r c E a 10 a w U m % d E d m O O w o m@ r r Ug U m U m F- 2 ■ )!) } k� ,k.\$/ 1;2a!! )§( �f . ƒ ®kk /)!|�\ \\\} ( � §Q\ }(\\ )!) . ,k.\$/ 1;2a!! )§( �f . ƒ ®kk /)!|�\ \\\} ( }(\\ !B@§@ k) / {ƒ / | : )!) . ,k.\$/ 1;2a!! )§( CD 2§§§ )§( �f . (\{|ƒ� /)!|�\ CD 2§§§ )§( �f . \\\} ( }(\\ !B@§@ k) �)2![ {f( 0 � wwV ! �& CD 2§§§ )§( �f . \\\} ( CD 2§§§ �f \\\} ( CD 2§§§ I � � \ //« $� /! 0 Q \/ !!! ]r |k= jet � z IL) \ ■!! I)! �{ 2 ; 0 Q \/ |k= jet � z z!. ■!! I)! �{ 2 ; {§\ }!$ /k \§)(0 aL (\ T 0 Q \/ jet z z!. 2 ; /k \§)(0 s c v L v •a •` m c oa o s 00 ° °0 3 Y ai a 0) `o v 3 o a cu -0 G C N N C Ol y 00 N N N V C O Y Q L Y U G } N b0 Q Y l% U c c O O C 3 O N h 0 0 N Z C Ul N` U Y N u Ol C. N CN Y -O r c O C :U � G y o Q N 'x o to a c— V v ° 3 E mu Em H a E N v L �+ N G N O L L Y T Y cu Y d to O N Ot O G w w = @ N 13 > w u m E= m NO > C' O C 2 L y, O L m O v a W — L 7 m O, m D E E .0 O o o 2 3 m a c L u @ > G N N A x OG E O1 N 3 yL.1 Y N c p G M C N A (O L lO Y W O C C Y E r ro> u a r v N 4 Y L C. a L 3 L H m N t O N m 3 o m N Y 0 o m 3 m Y � m•- E L z O v � c •y, c m E v c c O _ y _N M 3 u ~ m u a a °' M y Ea ov on0 o of v v �' v o 0 t o Q N 'u' N m 'y Y c 0 Y 000 ° (O V N N C' a bO N E C W > N > O C N C— O, ^� m Y j O m 0 GL E O Z �O' N> O y N c }a > N O. N G O N C Y y N m N L N 'O ED N O fm @ a.. Q V L N > tb 9 O E O O Y O) C CU O. ° N t� o o °c o N o 6 h E r a G ° o Q u >, M ._ L Vl O O_ T wV. a. m — Q> G_ m o a u v o ° n 3 3 'o 'E w E c w O >. N O 7 •— O N Cd% co bO p "� i Ol — Q ccOl N c n U u N c0 C N d V i E a °o X a Y Q o m a?& w o 3 a v o Eve >m rroc0c v Oj c C C' d 0 E N L N C O p V >, U` y 4L- V Ol H M '� u�.� p Cx1 t C YO Y i b0 fmp N $ E N o o '� G C m y w 0 Y "> o m m 3 G o o m C O -p N O Ln N V• e -i Y C- VO O V v 0 mJ u j Q O1 C m N ` wV, G 00 0)C aO• m ai ti V «. O y E O Y U N Y Y Y 3 u E o L N K •C H Y o u N bO O o d m w C Ncu a 0 E H 0 j H C G O N O_ m V O C U O N Y Ou v — V LLL Vf H Vf H N F -O w F-• LL V H 4A N THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Tyson Shriver Well Intervention Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Lisburne Oil Pool, PBU L3 -22A Permit to Drill Number: 219-051 Sundry Number: 319-207 Dear Mr. Shriven Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. a o gc c. a la sko.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 2sday April, 2019. RBDMSL*J APR 2 6 2019 STATE OF ALASKA -ASKA OIL AND GAS CONSERVATION COMMIS t APPLICATION FOR SUNDRY APPROVAi-„ 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Suspend ❑ Perforate ❑ Other Stimulate 0 Pull Tubing ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Operator Name: BP Exploration (Alaska), Inc 7- 2.t Well Class. 3. Address: P.O. Box 196612 Anchorage, AK99519-6812 c ❑ 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ APR 2 2 2013 Change pRppT1Qd Nt9Pm II Other Acid Stimulate / 01 Well Work Platform 5. Pemlit to Drill Number 219-051 - Development 0 Service ❑ 1 6. API Number: 50-029-21663-01-00 Well Name and Number: PBU 1-3-22A ' 9. Property Designation (Lease Number). I10. Field/Pools ADL 028322 8 028323 ' PRUDHOE BAY LISBURNE OIL 11 PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Deplh TVD(ft): Effective Depth MD: Effective Depth ND: MPSP (psi): Plus MD -13849' -8808' -13800' g ( ) Junk (MD): `6810' 2035 None None Casing Length Size MD TVD Burst Collap Structural wnuuutor 80 20" -48'--127' -48'--127' Surface 4072' 13-3/e" -47'--4119' 1490 470 Intermediate -9442' -47--4023 3450/4930 9-5/e" -45'- -9487'195012670 -45'--8453' 6870 Liner -664 7" -9320' - -9984' -8288'- -8862' 7240 4760 Liner -4015' 4-1/2" -9834'--13849' -8744'--8808' 5410 Perforation Depth MD (fl): Perforation Depth TVD (ft): Tubing Size: 9020 8040 -11500 - -13800 Tubing Grace: Tubing MD (ft): -6887 - -6810 4-1/2 12.8# 13Cr85 Packers and SSSV T ype: a1n^ HES TNT Packer -43 - -9839' Packers and SSSV MD (ft) and TVD (ft): -9200 / -8186 No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic ❑ 14. Estimated Date for Commencing Operations: July 22, 2018 . 15. Well Status after Proposed work: Oil 0 WINJ ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ Commission Representative: GINJ ❑ OI 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Authorized Name. Shriver, Tyson Contact Email: Contact Phone: Authorized Tide: Well Intervention Engineer Authorized Signature: 1,t �./ / ly_ Date (/ i r COMMISSION USE ONLY No SSSV Installed Development 0 Service ❑ WDSPL ❑ Suspended ❑ GSTOR ❑ SPLUG ❑ Shutdown ❑ Abandoned ❑ Shriver, Tyson Tyson.ShdverQbp.com +1 9075644133 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test all— Mechanical Integrity Test ❑ Location Clearance ❑ I _ 2 0j Other: A-)" � pP`e— 10-$-r 910 tSOO�S/ Post Initial Injection MIT Req'd? Yes ❑ No ❑RBD�AS/£' APR 2 6 20i Spacing Exception Required? Yes ❑ No L3/ Subsequent Form Required: 10-40y J APPROVED B Approved by: COMMISSIONER COMMISSIONYTHE Date � RIGINAL Form 10-403 Revised 04/2077 ,rt Submit Form and Approved application is valid for 12 months from the date of approval 1• Q 2y?3titiacn/a,ants in Duplicate `.f T/7iVv � Platform Floor Riser to platform floor lig Ii .i .i Annular Blind/Shear HydraulicalyActuated V Ive /Slip Coil Pipe' Choke Line pOcO" `/ I Kill Line 2-3/8" Pipe/Slip Coil Pipe/Slip • 7 x7 Spool O SSV Master Valve THA 0 1 l Tubing Head Ground Level THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Kenneth Allen Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.a ogcc.a la ska. gov Re: Prudhoe Bay Field, Lisburne Oil Pool, PBU L3 -22A BP Exploration (Alaska), Inc. Permit to Drill Number: 219-051 Surface Location: 812' FNL, 833' FWL, SEC. 22, Tl IN, RI 5E, UM Bottomhole Location: 312' FNL, 2574' FWL, SEC. 23, T1 IN, RI 5E, UM Dear Mr. Allen: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner �� DATED this _� day of April, 2019. STATE OF ASKA OIL AND GAS CONSE VAT ON COMMIS$APR 0 4 2019 PERMIT TO DRILL 20 AAC 25.005 .•. ss .•. n pe of Work: lb. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify Will❑ Lateral ❑ 7Reddll Strati graphic Test ❑ Development -Oil 0 - Service-Wnj ❑ Single Zone 0• Coalbed Gas ❑ Gas Hydrates❑ 0 • Reentry ❑ Exploratory - Oil ❑ Development -Gas ❑ Service -Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 5. Bond Blanket 0 • Single Well ❑ 11. Well Name and Number: 2. Operator Name: BP Exploration (Alaska), Inc Bond No. 295105380 • PBU L3 -22A Address: 3. 6, Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchors a AK 99519612 MD: 13849' • TVD: 8808' PRUDHOE BAY, LISBURNE OIL 4a Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028322 8 028323 8 DNR Approval Number. 13. Approximate spud date: Surface: 812' FNL, 833' FWL, Sec. 22, T11N, R15E, UM • 1452' FNL, 4478' FVA-, Sec. 22, T11 N, R15E, UM 84-62 July 3, 2019 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: 312' FNL, 2574' FVW, Sec. 23, T11 N. R15E, UM Total Depth: 17150 Well Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.33 -feet 15. Distance to Nearest Well Open 4b Location of (State to Same Pool: Surface: x- 708096 • y- 5961492 Zone - ASP 4 GL Elevation above MSL: 22.38 • feet 030 16. Deviated wells: Kickoff Depth: 9487 ' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 112 degrees Downhole: 3468 Surface: 2612 Cement Quantity, c.f. or sacks 18, Casing Program: Specincetions Top -Setting Depth - Bottom Hole CasingWeight Grade Coupling Len h MD TVD TVD (includingstage data) 8-1/2" 7" 26# L-80 VamToP HC 6649320' 8288' 9984' 8882' 167 sx Class'G' 6-1/8" 4-1/2" 12.6# VamTo 4015' 9834' 8744 13849' 8808' 446 sx Class'G' PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re Entry Operations) 19 Total Depth MD (tt): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk( measured): 10480 9399 I 9874,9884 9874 8811 9858 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 1725# Poleset 39-119 39-119 Surface 4072 13-3I8" 2350 sx AS III, 600 sx Class'G'. 150 sx AS 1 38-4110 38-4014 Intermediate 9833 95/8' 790 sx Class'G', 300 sx AS I, 175 sx Class'G' 36-9869 36-8806 Production Liner 862 7" 300 sx Class'G' 9618-10480 8568-9399 Perforation Depth MD (ft): 8718-10221 Perforation Depth TVD (fl): 8663-9147 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Thompson. Jacob from without prior written approval. Contact Email Jacob.ThompsonCQBP.com Authorized Name Allen, Kenneth W '1 907 564 5579 Authorized Title Engineering Team Lead Contact Phone Authorized Signature -_�• ��_ Dat 7 / CommissionfUse Only Permit to Drill '7 G�� API : 50- 029-21663-01-00 Permit Approval Date: See cover letter for other requirements: Number: Conditions of approval : If box iiss7checked, not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ,wwell �may Other:B©P=L-r!Er i 4rxit V 3�LJwT� i Samples req'd: Yes 0 N 9/ Mud log req'd: Yes 0No 14 H2S measures Yes 4s No 11 Directional svy req'd: Yes 4d" No ❑ 1 iLof Spacing exception req'd: Yes ❑ No l� Inclina8ononly svy req'd: Yes ❑ No L � CL • 0 (0!a AP_ 0 V. y) Post initial injection MIT req'd: Yes ❑ No ❑ h {lprr4o 1T use -Lt ow 1055W5 1 APPROVED BY Approved by COMMISSIONER THE COMMISSION Date: 25"� Form 10-401 Revised 5# �Xhi�mlt IS valid fc 2} rpgr,tis&ttf AL -vat (20 AAC 25.005(9)) Submit encs n D tttiii 1 ` VVV 1 �rl�,twpf� /(//� Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Jacob Thompson Date: April 3, 2019 RE: L3 -22A Permit to Drill Well History: 1-3-22 was originally drilled and completed in 1986. After a high GOR additional perforations were added in 2016. Since the well had suffered from low productivity and has been shut-in since August 2017. L3-22 has no remaining value as all reasonable attempts to restore performance have been exhausted. Scope of Work: The sidetrack plan for the L3 -22A well includes the following operations. Pre -rig, a inflatable bridge plug with 25' of dump bailed cement will be placed in the production liner above the Lisburne and Ivishak. Once the cement has setup, the top of cement for each plug will be determined with a drift run followed. The top plug will be pressure tested. Next, the 2-7/8" tubing will be jet cut. The rig will then move over the well and pull the 2-7/8" tubing. A clean out run will then be performed if deemed necessary, followed by the setting of an EZSV bridge plug in preparation of the whipstock exit at -9,470' MD. An 8.-1/2" hole will be drilled down to the the top of the Lisburne formation and a 7° intermediate Liner will be set there. A 6-1/8° production hole will be drilled in the Wahoo reservoir. The production liner will be a cemented and perforated. 4-1/2" tubing will then be run to the top of the production liner. MASP: 2,612 psi Estimated Start Date: July 3rtl 2019 If there are any questions concerning information on L3 -22A, please do not hesitate to use the contact information below. Jacob Thompson Office: (907) 564-5579 Cell: (907) 854-4377 Email: Jacob.lhompson@bp.com Attachments: Well Bore Schematic Proposed Pre -Rig Schematic Directional Package BOPE Schematic 272 Email correspondence for changes to the sundry. 1_3-22A PTD 1 4/3/2019 Planned Well Summary Well L3 -22A W pe Producer Obaect ve Lisburne Current Status Shut in. Estimated Start Date: 7/3/2019 Time to Com lete: 24.5 Da Yis Surface I I'll oIII in 1 Eastina Offsets TRS Location 1 5,961,491 708 096 4467 FSL / 4446 FEL 11 N 15E Sec 22 - Northinp :21stin TVDss Offsets TRS TLSB 5,960,953 711,757 8792 1 1452' FNL / 803' FEL I 11N 15E Sec 22 BHL 5,962,188 715,099 8,739 1 312' FNL / 2705' FEL 1 11N 15E Sec 23 Planned KOP: 9,487' MD Planned TD: .13,849' MD / 8,739' TVDss Rig: Parker 272 GL -RT: 1 46.95 RTE ref MSLY, Fw69.33 Directional - Baker wp05 ll 9487' MD `38.250 in the intermediate section Maximum Hole Angle: -1120 in the production section Close Approach Wells: N/A Surface to 9,409' MD = Bos GYRO (Old) 9409' to 9,800' MD = 17 �,, Survey Program: 9800' to 9984 = MWD + IFR a-0 C-'NY•R.E,Ul 9984' MD to TD = MWD+IFR+MS Nearest Property Line: -17,150' Nearest Well within Pool: 1 -1,030' 1-3-22A PTD 2 4/3/2019 Formation Tops and Pore Pressure Estimate (SOR) Depth Form. (TVDss) Pore Pressure Sand FG Shale FG ML (PPg) ML (PPg) ML (Ppg) THRZ 8200 10.2 14.27 17 KOP 8360 10.2 14.29 17.03 LCU/Zn2 8400 10.2 14.29 17.03 TSAD 8401 7.4 12.87 16.19 8484g7.41 1 12.88 16.2 21 N 84844 VamTop 13.05 16.3 21 P 85494 13.05 16.3 8550 12.88 16.2 86291 Tubing 12.88 16.21 TKVK8630 VamTop 14.15 16.96 8793 9.9 14.16 16.98 Lisburne 8792 Wahoo 6.2 12.28 15.87 Invert 9047 6.24 12.34 15.95 9100 6.25 12.35 15.97 Casing/Tubing Program Hole Size Liner / Wt/Ft Grade Conn Length Top MD I TVDss Bottom MD I TVDss MST Tbg O.D. 9470'- 9,984' MD 9.8 - 10.6 • 10-15 20-30 <8 NA <20 8.5-95 . 8_112^ 7° 26# L-80 VamHC 664' 9320' 18,219 150' lap 9,984'18,793' g_1/g" ° q /, 12.6# 13Cr-85 VamTop 4,015' 9,834' / 8,675' 150' la 13,849'18,739' 9,839'/ 8,679' Tubing 4'/�' 12.6# 13Cr-85 VamTop 8,765' Surface -5' into liner TBS Mud Program Intermediate Mud Properties: LSND 8-1/2" Hole Section Depth Interval Density PV (�) lbl UOtt' API FL HTHP FL MST pH 9470'- 9,984' MD 9.8 - 10.6 • 10-15 20-30 <8 NA <20 8.5-95 . Production Mud Pro erties: Water Based P mer Fluid 6-118" Hole Section Depth Interval Density PV (cp)lW UOkz ppl FL HTHP FL MBT pH 9,984" MD - TD 1 8.5-9.5 -1 <8 I 12-20 <12 NA <4 1 8.5 - 9.5 1-3-22A PTD 3 4/3/2019 Logging Program 8-1/2" Intermediate Sam le Catchers - as required by Geology Drilling: Dir/GRI RES Oen Hole: I None Cased Hole: I N/A 6-1/8" Production Sam le Catchers - as uired b Grolooy Drilling, Dir/GR/Nue/Den/ oflima e 0 en Hole: None Cased Hole: None Cement Program Casino Size 1 7" 26# L-80 VamTop HC Intermediate LeadN/A NIA Lead TOC NIA Basis Tail 200' above DP x CSG + Liner La + Open hole volume + 40% excess + 85 It shoe track Tail TOC 1 200' above TOL Spacer 1 -25 bbls of Viscosifed Spacer weighted to -11.0 Total Cement Lead NIA Volume Tail 34.9 bbls, 195.8 cult, 167.4 sks 15.8 lb/gal Class G - 1.17 cuft/sk Temp I BHST 169° F Casin Size 4.1/2' 12.60 13Cr-85VarnTop Liner Lead NIA Lead TOC N/A Basis Tail 200' above DP x CSG + Liner La + Open hole volume + 30% excess + 85 ft shoe track Tail TOC 200' above TOL Spacer -25 bbls of Viscosified Spacer weighted to -11.0 ppq Total Cement Lead N/A Volume Tail 92.9 bible, 521.6 cult, 445.8 sks 15.8 lb/al Class G - 1.17 cuft/sk Temp BHST 180° F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub -Surface Pressure Management: No pressure management plan is required. Anti -Collision: All offset wells pass BP Anti -collision Scan Criteria. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP L3 -22A PTD 4 4/3/2019 Hydrogen Sulfide 1 -3 -Pad is considered an 1-12S site. Recent 1-12S data from the pad is as follows: Well Name H2S Level Readina Date Comments Parent well (if sidetrack) #1 Closest SHL well 1-12S level #2 Closest SHL well H2S level #1 Closest BHL well 1-12S level #2 Closest BHL well H2S level #3 Closest BHL well 1-12S level #4 Closest BHL well 1-12S level Max. recorded 1-12S on pad/facility Faults No Faults are anticipated. Drilling Waste Disposal 1-3-22 110 ppm 07/03/2017 2,612 si at the Ivishak 0.10psi/ft gas gradient to surface 0-18 0 ppm 04/22/2017 Assumes 7.8 ppg pore pressure in the SAD + 0.5 ppg kick intensity 1-3-24 60 ppm 05/12/1997 Rams test to 3,500 psi / 250 psi. 1-4-11 750 ppm 03/10/1998 Prod. Hole 1-3-10 40 ppm 10/09/2017 Prod. Hole 04-22 n/a Int. hole 04-21 375 02/18/2017 Int. hole 1-3-24 999 1991 • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. Well Control The 8-1/2" hole section will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequencywill be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-112" Intermediate Interval Maximum anticipated BHP 3,468 psi at the Ivishak at 8,550' TVDss 7.8 ppg EMW Maximum surface pressure 2,612 si at the Ivishak 0.10psi/ft gas gradient to surface 25 bbls with 11.4 ppg frac gradient. Kick tolerance Assumes 7.8 ppg pore pressure in the SAD + 0.5 ppg kick intensity and 10.3 ppa MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Annular test to 3,500 psi / 250 psi Ante ri Test — 8-112" hole FIT after drilling20'-50' of new hole 7" Liner Test 3,500 psi surface pressure 1-3-22A PTD 5 4/3/2019 6-118" Production Interval Maximum anticipated BHP 2,940 psi in the LSB at 9,047' TVDss 6.25 ppg EMW Maximum surface pressure 2,035 psi 0.10psi/ft gas gradient to surface Kick tolerance Infinite with >9.7 ppg frac gradient. Assumes an 6.25 ppg max pore pressure in the LSB + 0.5 ppg kick intensity and 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Annular test to 3,500 psi / 250 psi Inte ritTest - 6-1/8" hole FIT after drilling20'-50' of new hole Liner. To Packer 3,500 psi surface pressure Planned completion fluids 8.5 ppg seawater / 2,200 ft diesel to 1,935 ft TVDss Variance Requests The Lisburne formation can be highly fractured with high lost circulation potential. Assuming zonal !cam " isolation requirements are met on the 7" liner cement job, and if lost circulation occurs prior to drilling 20 ft. of new formation, it is requested to drill to production section TD without obtaining a FIT. A similar event occurred in 2015 on L1-23 (PTD 215-060) and a variance request was granted. Pre Rig Summary 1. Run flapper checker. Dummy gas lift valves. MIT -IA to verify valves set. Pull chemical injection valve, flush chemical line, set dummy, test line. Pressure test control lines. 2. A/SL.Load IA. MIT -IA. Load TBG, obtain step rate test. 3. RIH with TTBT plug and set at -9,864' MD 4. Dump Bail 25' of cement on top of TTBT plug TOC -9,839' MD. 5. D&T TOC. RIH with TTBT plug and set at -9,707 MD 6. Dump bail 25' of cement on top of the TTBT plug. TOC -9,682' MD. 7. D&T TOC. Drift for jet cut. 8. MIT -T 3,500 psi. CMIT-TxIA 3,500 psi. Negative pressure test 9. Jet cut tubing at 9,520' MD. 10. Circ out. CMIT-TxIA 3,500 psi. MIT -OA 1,100 psi. 11. Set TRSSSV hold open sleeve. 12. Cement control/chemical lines that fail PT. 13. PPPOT-T. PPPOT-IC. Function LDS. 14. Set BPV. Install Dry Hole Tree. Configure annular valves. "Red Text Indicates changed operational steps when compared to the approved sundry. See attached emails for more details. L3 -22A PTD 6 4/3/2019 Drill and Complete Operations Summary 1. Move in Parker 272. ' 2. Nipple up BOPE and test to 3,500 psi. 1* 241a� we re o 3. Pull 2-7/8" tubing from pre -rig cut at -9,520' MD. 4. Make cleanout run to tubing stub if deemed necessary 5. Rig up a -line and set EZSV at -9,487' MD and pressure test. 6. Change out 9-5/8" pack -offs and tubing spool. 7. Run and set whipstock at 9,486' MD and mill window and 20' of new formation from middle of the window. Perform FIT to 11.4 ppg EMW tr:IT* 4 T -M 8. Drill 8-1/2" hole to top of the Lisburne to TD at -9,984' MD. r ✓?b �- R. 371 9. Run 7" liner and cement to 200 ft above the TOL at -9.,�W MD. 10. Pressure test casing to 3,500 psi. FFC a5 �,, `r�5; Jr. j� pG GC 11. Drill out of 7" liner and perform FIT to 9.7 ppg EMW. 12. Drill 6-1/8" horizontal production hole in the Lisburne to TD of -13,849' MD. 13. Run 4-1/2" chrome liner and cement. 14. POOH and lay down liner running tool. 3d r. µ JOJKAS�� 15. Pressure test liner and liner top packer to 3,500 psi. i6r 16. PU perf guns and perforate. 17. Run 4-1/2" chrome completion tubing. Sting into tieback receptacle and set production packer. 18. Pressure test the tubing and inner annulus to 3,500 psi each. 19. Freeze protect well. 20. RDMO. Post-Riq Operations 1. V: tree work/Pull BPV 2. SL: DGLVs 3. C: Set retainers/acid job/mill retainers (assumes 4 acid stages) 4. SL: LGLVs 5. T: Flowback (while coil mills, acid clean up, and obtain test) L3 -22A PTD 7 4/3/2019 L3 -22A Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures B. Intermediate Hole: The Ivishak is expected to be at a 7.8 ppg EMW. Reservoir pressures will be controlled with a 9.8 —10.8 ppg mud to ensure stability in the HRZ, LCU, and Kavik Shales. ✓ C. Production Hole: The Lisburne is expected to be at a 6.25 ppg EMW. Reservoir pressures will be controlled by using 8.5 — 9.5 ppg water based mud. II. Lost Circulation/Breathing A. Intermediate Hole: There are no expected fault crossings in the intermediate hole. However, there could be seismic faults or fractures in the Ivishak. B. Production Hole: There are no expected fault crossings in the Production hole. By nature, the Lisburne is a highly fracture formation that is prone to lost circulation. - III. Fault Locations N/A IV. Integrity Testing Test Point Test Depth Test type EMW (Ib/gap 9-5/8" Window 20'-50' from the middle of the window FIT 11.4 ppg 7" shoe 20'-50' from the 7° shoe FIT 9.7 ppg V. Hydrogen Sulfide L3 -Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Readino Date Comments Parent well (if sidetrack) #1 Closest SHL well H2S level #2 Closest SHL well H2S level #1 Closest BHL well H2S level #2 Closest BHL well H2S level #3 Closest BHL well H28 level #4 Closest BHL well H2S level Max. recorded H2S on pad/facility L3-22 110 ppm 07/03/2017 L3-18 0 ppm 04/22/2017 L3-24 60 ppm 05/12/1997 L4-11 750 ppm 03/10/1998 Prod. Hole L3-10 40 ppm 10/09/2017 Prod. Hole 04-22 n/a Int. hole 04-21 375 02/18/2017 Int. hole 1-3-24 999 1991 VI. Anti -Collision Issues ➢ None. All offset wells pass BP Anti -collision Scan Criteria. CONSULT THE L3 -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. L3 -22A PTD 8 4/3/2019 TREE= Cfw VIBLHEAD= MCEVOY ACTUATOR= 84KER KB. f3 -EV = 60' BF. ELEV = 23.44' KOP= 3100' Max Angle = 39'@ 7200' Datum 11D 10028' DatumWD= 89W Ss L3-22 13-3/8• CSG, 68M, , 70' K-55 BTC, D = 12.415' O 20" COPDLCTOR.91.5#, H40, D =19.124' 118' C Minimum ID = 2.250" @ 9654' 2-7/8" CAMCO D NIPPLE 13-3/B' CSG, 72#, L -B0, D = 12.347' 4110' 8516' CSG. 47#. L-80 NSCC XO TO L-80 BTC 461T ITOPOF7'LNt r--1 9631 '.PC, 6.501, L-80 l3)E BR0. 9666' D = 2.441' 47#, L-80 BTC, D = 8.681' 9868' PEWORATDN SUMNKRY REF LOG: LIT/CPL ON 11/20/86 ANGLE AT TOP FEW: 18' @ 9718' Nota: Refer to Production DB for historical perf data SIZE SPF MEiVAL OpNSgz SHOT I SOZ 2-18" O 9718-9742, O 09/13/18 BK 2-1/8' S 9942-10002 C 03Y13B7 36 T 6 10043 - 10083 C 0525/15 4 2-116' S 10043 - 10126 C 03/23/87 BK T 6 10092 - 10127 C 0525115 24 2-W 'S 10141-10219 C 03/23187 6 T 6 10158 - 10173 C 05125/15 RKP T 6 10196-10221 C 0525115 Selective Shots C 7' LN1. 29#, L-80 BTC, .0371 hpf, D = 6.184' SA NOTES: CHEMICAL MANDRELS TYPE VLV LA KBMG-L I DAM B GAS LFT MANDRELS ST MI)JIVDIDWITYPEMANI DATE REV BY COMMENTS 11!24186 VLV I LATCH I PORT DATE 2 2811 2811 4 MGFMID DOME BK 16 12/17/18 3 5390 5063 36 W FLM DOW BK 16 12/17/18 4 7531 6754 38 M0,F7MPI0 DOME BK 16 09/3N17 5 8944 7942 24 MC'FMHD SO BK 20 09/30/17 6 9475 8433 20 MC FMiD RKO RKP 0 03/31/87 8682' a51s• x 19-5/8- X 7- TIEBACK D=?' 85/8' X 7• BOT SHORTY HY D HGR. D = 7' 2-7/8' CAMCO D NP, D = 2.25' 9874' Es7TOC(09/12/18) �CIJ m DATE REV BY COMMEWS DATE REV BY COMMENTS 11!24186 INTTAL COMPLETION 09/28/18 DDIJAID ADDED BF ELEV 8 COAD PFO 02/22/14 PJC FUORMAT DRAWING 12/16/18 ZV/JMD GLV CJO(12117118) 06/22/15 DMJbD ADFE FS (05/25/15) 10/16/17 GJBIJkD GLV C/O (09130/17) 07/30/18 TAIJbD SAND PLUG (07/17/18) 09/18/18 ALVY/JMD TAG SAND, DUMP CWr. ADfE2FS LISBURrE LUT WEL L3-22 PBUT No: /1861750 AR No: 50-029-21663-00 7Z T11K RISE, 812 Ftd. B 833' BP Bcploration (Alaska) T17 E= CNV WELLHEAD= KMOY ACTUATOR= BAKER KB. E.27 = 60' BF. E -EV = 23.44' ROP= 3100' Max Angle = 39' rQ 7200' Datum MD = 10028' DatumTVD=- 8900'SS 13-3/8" CSG, 68#, , K-55 BTC, V= 12.415" •DOCTOR,91.5#,K,40 D=19.124" tts' Minimum ID = 2250"@ 9654' 2-7/8" CAMCO D NIPPLE 13-3/8" CSG, 72#, L-80, D = 12.347" 4110' CSG, 47#. L-80 NSOC XO TO L-80 BTC 4617' Prr -ijg j�tcutat-9,520'M D LNR 2-7/8' TBGPC, 6.5#, L-80 EE8RD, .0058 bpf, ID= 2.441" j9-5/8" CSG, 47#. L -8o BTC, D= 8.681 PERFORATION SLI. MRY RE= LOG: LDTICTL ON 11/20/86 ANGLE AT TOP FES: 18" @ 9718' Note: Peter to Production DB for historical pert data SIZE SPF I ME2VAL Opn1Sgz SHOT SOZ 2-1/8' O 9718-9742 O 09/13/18 5390 2-1/8' 'S 9942-10002 C 03/23/87 4 2' 6 10043 - 10083 C 0525/15 09/30117 2-1/8' 'S 10043 - 10126 C 03123/87 SO BK 20 2' 6 10092 - 10127 C 0525/15 MGF" 2-1/8' 'S 10141 - 10219 C 0323/87 2' 6 10158 - 10173 C 0525/15 2' 6 10196 - 10221 C 0525115 Selective Shots L 7" LW 299, L-80 BTC, .0371 bpf, D = L3-22 LE NOTES: 12-7/8"CAMTRDPiA-SSATRSSSV,D=2.312- I ST KU TVD DEV TYPEMAN VLV LATCH PORE DOTE 2 2811 2611 4 MGFNRO DOME BK 16 12/17/18 3 5390 5063 36 MGFNiO DONE BK 16 12/17118 4 7531 6754 38 MGFNiD DONE BK 16 09/30117 5 8944 7942 24 MGFNHO SO BK 20 09130117 6 9475 8433 20 MGF" RKEJ RKP 0 03131187 9682' 9-5/8" X 2-7/8- BRWYN FIB PKI 9618' 9-5/8" X 7" TIEACIC D=?' ��� 9-5/8' X 7' BOT SHORTY FRY 966,4• 2-7/8" CANIDO D NP, D = 22 9666' rI2-7/8" VVLEG, D- 2.4, 9682' —New TOC#2 9707' _—TTBT Pluj.. 9847' i—j 7' MARKER JOINT (2 �— T NWRl03R JONT(20 9839' —New TOC#1 _9_884'—T13TPJug#1 9874' —EST TOC (09/12/18) 9984' 7OPOFSAND(09/121 FISH - 2-12" JD DOG SPRING (05/11108) DATE REV BY I CONIA34TS DATE I REV BY I COMMENTS 11124186 INITIAL COMPLETON 09/28/18 DD'JN) ADDED BF EEV 8 COPD NFO 0222114 PJC REFORMAT DPAV44G 12/18118 ZV/JMD GLVCJO(12/17/18) 0622/15 DHS/JND ADPERFS(0525115) 10/16/17 GJB/JND GLV C/O (09/30117) 07/30/18 TA/JNO SAND PLUG (07/17118) 09/18/18 NLW/JND TAG SAND, DLW OMT, ADPE7FS LISBl1RTE (NT WE_L L3-22 PERMIT Nb: 9861750 API Nb: 50-029-2166300 >2, T11 N, RI5F-817 FN- 8 833' BP Exploration (Alaska) TREE= aw PROPOS' 7 WE-LHEAD= MCEVOY ACR)ATOR= BAKER REV 1 K8. g 6Q 13-38" CSG, 68#, 1 . , KOP=� 3100' K-55 BTC, Max Angle= _"� D=12.415" Datum MD= 0—C DsWm TVD= 89W SS 13-3/8" CSG, 72#, L-80, D = 12.347' 41' Minimum ID = " 9-51W CSG, 47#, L-80 NSOC XO TO L-80 BTC 4-1/2" TBG, 12.6#, 13 -CR .0152 bpf, D = 3.958' TOP OF 7" LNR ITOP OF 4-1/2' LNR I 7' LNR, 26#, L-80 VAMTOP HC, .0383 bpf, D = 6.276' PERFORATION SIIMTMRY tiff LOG: ON ANGLEAT TOP PERF: _' @ _' Note: Refer to Production DB for historical pert data M. -I. I.— 17 D = 3.958" L3-22, SAI NOTES: 14-112' HES X NP, D=3.813" 1 GAS I IFT MANDRAc ST MD TVD DEV TYPE MAN VLV LATCH PORT DATE 6 5 4 3 2 1 HES X NP, D = 3813- 19-518' X 4-1/2" PKR D = " I 14-12"HES X NP. D=3.813" 1 14-12" HES X NP. D = 3.813" 1 MLLODT WINDOW (1-3-22A) 9470' - 9487' DATE REV BY COMu NTS DATE RLV BY COMMBNIS 1124186 INITIALCOMPLETION SIDETRACK(1-3-22A) 01/03/18 JND BUILT PROPOSED 01/03118 JMD BUILT PROPOSED REV 1 X 4-1/2" WFD HGR, D= LWURN LINT WELL: 1-3-22A PNMT No: AR No: 50-029-21663-01 SEC 22, T11 N, R15E, 817 FNL & 833' BP Exploration (Alaska) J � .L Lo co E a. _ a Q � CD N N A {i C d N N M J C A, Z Afi _J J J J d 7r z Q a 0 E m S o o 3 Q a `g' y N N N z z J J ?•' z 3: m m z J J J e m m w \ N O N N O m y d Of y N O N N N c '� �m vLL`iu33p a` it7 im inLLn 33 mN I N r N 0. m m ay W tpm0� Qj W C d I /by, cH lJ � a � ggqy W u N N Q > W N m mY W O j Y Y E y a u E v g g ? W > D a «0 - U o u C C D P L W � LL O W W W y W v W E • UO � y D• >. W o 0 0 f Z N 0 m n m o l tl N m N M < W � C CL o m EL W m t = rc m o c Y q o i m y o Z w m c Y L 0— O z w 3 u W p m m m m 'P o n N O � W N W 6 z a E ¢ W m o J W m W J J 3 g c ry N Z (7 N a p p m o Z 0 n G a n W z Q a 0 E m S o o 3 Q a `g' y N N N z z J J ?•' z J J J e w O m y d Of y N O N a° a c '� vLL`iu33p a` it7 im inLLn z Q a 0 r << ! §) 9 0 q § w LQ k0 IR LQ IQ _ ~ ~ ~ ~ )}}!{§ -- \ k / \ ( \ \ \ k§ ! a a a ;!|!$; ; w ww . w w , - , )§§)0k &f® �)�j \)§(§2 , � &\� CD. . ; ) k : ! j §! :! §j§kt(k^ / ~ 2 : 75 . ;\t&&§ ;«<«a§ ¥ ■c !ƒ<<<<< : 24 \AA\\\ ! li 16{ E | s\ 32■ e CL ! ,alae !}a�( , | (a|m m| Z. 'm \ || §� \ �\!|0 00 0 0 0 0 0 0 00 0 0 o 0 0 a 0 o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a 3 m m H Z Z N a a o O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O o O O O o O o O 5 R N N d N N N N N N N N N N N N N O O O O Z C U A m w W D m K m n m m n w N r N a N n n O a o N o b W m m m m N m N P O !1 a s N N N n m w O N 0 m N m r O P N N m 61 Y N N m m W N O m O m ro m m m m n ' ^ - a Q o m m O N m w N tev m N uwi P N O O G N m O N r O W N O N O w w 1 n m W O m N P r P M m p 0 0 0 o w w w W w W m t C m m m m m m m m im m im m m m m m m m= m m m w w w w w w w m w w W w W rm O 6 Y m c - D C y r N O N N n CI N W 4` m W m1 O O N w N r W Q K q p p V P Y N O r O O O O N N N N N N N m V d T pi c6of ni of ti m ei ri w m m ei m ei Z 3 G m o J F E 2 m O W= N W O O P O O m O O O N w P m NN m r r m m m m W O O b N P N NISI m m m me 2 O 0 N 0 O 0 O o O m r o O 0 O 0 O 0 O o O P O P O m b w N o O Q m a mP N pW N N N m rw m pm n A N N d O P N I(1 v b m M m w m w In m W w o Cf m W W M w w m N m n n n o m N N m N C N r m p N P N m m m W w n N N P r N m r m w r m m C C m N m N 0 N m m 0 b m (D m m 0 m m m b m m r 0 m m m m m m m m m m m m m m m m m m m m m m m m m m OR m m m m m m m e 6 d 6 6 6 v a e a 6 d 6 6 e v a m m JQ m m m 0 m �p N N N N CI t7 lN�l M a7 N m p M O Ip Q E d ¢ Q 9 D L a N N N O O O N N O O O O O Y m p O Y C O W O n O J O m O N m w w N O O N m O O N N M r W n O N N N N � O m � N O m N Ip b m b n A n r r Y m m m W W N w a W w P W w m O W W Y w W w � w ' � yY m y O C m 6 y p W G C O O O O O W f0 O N N W W N P w W m O O O O � N N N N N N N N N w w a d m_ ~ z z a a m d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 O 0 o 0 0 0 0 0 0 0 o 0 o. 0 0 0 0 0 0 0 a d O O N N W q m O Q r W N N W P N m W m W W n 3 a N (O m Q m P W N P N m N N w a s O N b m m N N m m y N m m m r W N P r m w W m w W o u g g�� c w Q Q m m m N N O W W m m m r 9 W w W w w w w w W m m m m m m m a b m m b m m O m O m O m O {p O b O m O m O m w O m m O m m W w m C ZN N N N N N N N N N N N N N N N a o C V d C V W w m m m N O f7 m m M m b P W 9 C V m m o o o m m Q d .d. a ry of vi of w a of 6 w ei e n W m b b m m m n n n n m m W m m n: d L d a m m of n m wi of m ei m M of m ei m ri C O W N P N O b w m P N W N N m m �- T Q N N N b m n b n 10 m fO w W O 1r r r N b d T 9 d m C Z m C c m a 0 N o O m r m O o O 0 O o O W r o O o O n N o O 0 O 0 O 0 m 0 O N M w N O N O O e N N e N b W n b w N N N PN W W n w W m O dw n m m m m m m m m w w W W W w o m m ro m m ae m m ai m m re m m m of � z a m N m m W o W N m m m H m m o m W m m N N m n n n W m P t�l N Q b m r m m m m m w w W w o 0 0 o a 0 m C m m w m m m m m ro m w di w m W a z� m m m m Wm m m m Q m r m m W m m O W n N N W m N N m N W 6 e 6 e ^ 0 0 0 0 0 0 o m w m L a m N N N W nQ W m N W m P O b a m M l7 lm�l p l7 Q Q e P N N N m m m m q a O U y p0. 5 L � E a s O a E a a � L> N N N C a N N Nci p w Z J J J J J O O m N N m O n O w P ffi W O b a W O 7 N O b w CLt0 T a � Q m W N W W N O h O N O J � m O r 'j O W r O �j P N N O O N O O m a O W w O n I I d N 00a i G Rot a m n o 0 N o o 0 0 o w m W o 0 m o 0 0 o m I � m m vi ai of ae o 0 0 0 0 N n n n o 0 0 0 0 0 0 a tYn m W m m w m o O 0 o p 0 Q n N N n W A W r q r W n W n q n W n W Q J N m N Q O Q N r N m O m 0 N m N O N O N O N O N A W N f u o A n $ r ac a = `' Z Z E 3 O N m m c ¢ ¢ a f a a a m Q O 0 0 0 0 0 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O d N N d O O O O O O O O O O O O O O O O O 0 m m 0 O O O O O O O g O U Z O O O n m O O O O O O O O O Q M O O O O U O W m m J O O O m 0.6 O O T W N N S O N O O V y W O O O O !I O O O O W O O O d S 2 Q m N Y m A O A m m O O m m O N m Q Q m m n m W O c O O � O � � 9 � � � � 3 � � � r � N nj m m d a IY O C d O q m f0 O N W O Q W m m r N N j m N A N O O m N n Q o.0 Oo.m�i b N n m W Q O N m m Y n m n n m r co m e r $ m W m O m O N N N m Q 0 N 0 b 0 n E N W O O N N m Q Q N N m n r N N m m m m m Cl m t'J m N N N d g g N N O n O O m O N N N N m O Q N N O Q m N N O m N m W O W m N m N m W m m N m W m W m N N m O N O m m A n Q W r W W m m m n n A b Q; Q A m n W m W m O A n A m m m m N O m rW O m N m N Q m m mm W m � N O N W n m O r m b b N W d y W m m m m m m m m m m m W W m W O6 C d m cob O O m O m O b O m O m O m O m O m O m O m O m O b O b co b 0w W� m m m m W W m y m W W W W m W W m W W W W m m m W m L rd O V CU y Q N OI m m O N m N Q m n N m O N m N n m m N L d m m N m O m N Q N N O m m m Wy IN m O Q d d rd, d m A N b N m m m O N S N N WR � N N O O O Ori y m d Sy d V d W O co m N m m Q N m m r m W W O N m Q Q N U d d Q N N VI N N N N O m Q n N n m m A m m Q m A A M m W m m N b r m N A O N N N W m m N n N m W N m Q m m O h 0 ul m S N m Q N Cl N N O O Oi m YI m m r 0 N N m Q m O O N m m N W N m O n n N N N m m r n n w n f0 m m m fs1 (O ISI N Vl N N lr Q m � N n m m Q m m O W Q O N O m Q O m N N O m m m b m m O) O) m IA W m w m m m m m m m m m m m m m m m a m z 3 Nm m m m m W m m m Q m N m m m YI o N N m m m N D O N r O r m m m m m N N Q m N O O m m W m m m m m m r m n N A W b N m Q p o 0 o m W 01 m W m m m m m m m m m w w a di di a W w to m m m m ae m m ao m di oe to m O CcP d N m N N m m m m m m p m Q Q Q Q Q Q Q Q Q w W W m m m n m A r r n n n n n tO N N � Oi f0 N N N N N N O n Q Q Q Q Q Q Q Q Q W m W W m m m m m m m m m r r n n A r n n n n I ¢m O O tYn m W m m w m o O 0 o p 0 Q n N N n W A W r q r W n W n q n W n W Q J N m N Q O Q N r N m O m 0 N m N O N O N O N O N A W N f o A n $ ac a = `' E 3 O m m c ¢ ¢ a f a C n O O O N O G O O N O O O n m O O O O O O O O O Q M O O O O OO O y m J O O O m 0.6 O O T W N N S O N O O V y W O O O O !I O O O O W O O O d S 2 Q m N Y m A O A m m O O W O O N m Q Q m m n m W O c O O � O � � 9 � � � � 3 � � � r � N nj IY O C d O q a o.0 Oo.m�i I�.' r m C Z m n 0 b Q m m m n n n m m m m O m F � V Omi 0 � N N m m m c m A o e d c E Q$ a d a m uain33 p a m epi o m m � umi r m w o N O O O m m O N W N n O O O O O O O O O O N 0 0 o P N m m Vm O ro m 0 0 0 0 0 0 0 0 0 0 m m w w m m m m m m m N m b ON OV m N O N N M N N m m m m m ma m N M m m N r 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O N b N N N N N O O O O O O O O O O C m m v � J O p � m C Z m n 0 b Q m m m n n n m m m m O m F � V Omi 0 � N N m m m c m A o e d c E Q$ a d a m uain33 p a n N m W n N n m W N N O m n h m m m m ae W m m ae < O m Q W N O N m N m m Q 0 m 0 m m m b m m m m m m m n Qn I C� n m m n M a r r n n m 1Q0 N YQ1 P P Cl N n W m b W O m W m m O m b N W n m m m o n $ w w o 0 Q N W n n Q Q Q Q P P Q Q N N n n n n n n n n n n O W N !1 m O N N OOi m N m Q O m N m Q m n n m m m N N Q O 0 co m m o n Q m 1� N N N N w m m m a w w N m W N m m N N m m N N C m W N m m M V OJ N W N t0 O l'] O m m Q m m Cl m N b tO fU m m ro ro m e n N n n m b m m N W N O m N m P O m O N n m N Q N O 0 n P b m N N N N O Q Q CW) n n n n n n n n n n ae m ru m m co m m ae a Q N O m n N M N O R I(f IV OI N N W O' O m m m 0 0 m m m m m m m m m m m m m m m m < O Q P Q O O Q V< e e c a a e v v a a m w W W W m m m m m m m m m m m m m m m m m w m m m m rn rn w m m `m m m m m m m m m .m+ C O q a O L O O O N b O O O O O O^ m O O O O O O O O O n p O o m m O O O O O O R OO o O O O O O p O O P m O O CNI J O O O O O O Oml ' 0 0 0 0 0 O O O O Q r N W W p Q N m n m W m m O Nm Q N m n m m C6 C6 � o q 6� � - - A � V m ani I m epi o m m � umi m w o N a a ei .r 6 6 6 a P n n n n n n n d NM m W N n m T m P N m m Vm O ro N 2- N W W O P N N m m w w m m m N m N N N m b ON OV m N O N N M N N m m m m m m N M m m N W n N m W n N n m W N N O m n h m m m m ae W m m ae < O m Q W N O N m N m m Q 0 m 0 m m m b m m m m m m m n Qn I C� n m m n M a r r n n m 1Q0 N YQ1 P P Cl N n W m b W O m W m m O m b N W n m m m o n $ w w o 0 Q N W n n Q Q Q Q P P Q Q N N n n n n n n n n n n O W N !1 m O N N OOi m N m Q O m N m Q m n n m m m N N Q O 0 co m m o n Q m 1� N N N N w m m m a w w N m W N m m N N m m N N C m W N m m M V OJ N W N t0 O l'] O m m Q m m Cl m N b tO fU m m ro ro m e n N n n m b m m N W N O m N m P O m O N n m N Q N O 0 n P b m N N N N O Q Q CW) n n n n n n n n n n ae m ru m m co m m ae a Q N O m n N M N O R I(f IV OI N N W O' O m m m 0 0 m m m m m m m m m m m m m m m m < O Q P Q O O Q V< e e c a a e v v a a m w W W W m m m m m m m m m m m m m m m m m w m m m m rn rn w m m `m m m m m m m m m .m+ C O q a O L O O O N b O O O O O O^ m O O O O O O O O O n p O o m m O O O O O O R OO o O O O O O p O O P m O O CNI J O O O O O O Oml ' 0 0 0 0 0 O O O O Q r N W W p Q N m n m W m m O Nm Q N m n m m C6 C6 � o q 6� � - - A � V m ani I 0 'm 3 m z z n a a h as N N d p J_ J_ Z U Y Y a NN J J ❑ Am O m of a mm� m pm Vv pJ � Y d d U N QI d1 E N m o 2 w Y C p O L O N 20 m N N N K O c u .q -O E c ii � u m� s 10 v c a m ❑ O m m rc u rc m a U 2 am 0 N O N o >❑> o J F� zZ N O c q m 0 c 0 Um' O O. N d CLT m C t0 a m a zo m m � a i ti n e m N L N ro 0 i V aCN p p 0 YV ; O J 0 CI b 5 a 0 0 o a y a w L a 6 of E N N N o O m M n m❑ Z J J J J J a OI O C N CL N ❑ O m 6 N U Iq o a m ti a Qa N N N N 0 O � � a d N W M � � m a am �� � s m N N p a a � Y Y Y ei J z z E = d55 0 I d y rc � m o � C d d m m- 9 i y 4 q o 5` O V m b v a t 0 0 o Y Z3 4— O C O d d T d IL z m rn C m L d J m q 3 d a a b E m z 1A A A b m A 1FFb FNF tFFb N N rJn y$ 3 a 3 N a 3 P r p o vai H 3 U m m A J p 5 a m n n m m m N n m m m 0 n W In q n y 3G N W O N M t7 W CI W W W ro Cl O Q bl O W N N W N < A p A C WW W W N G� (p y m tD W p 17 N W (p N A t0 W W � b W Y I(1 W V O O O 4J Yf W N W O O O OI g3 o maw N O N m N Q! fp W m of ae ac m ae ai rc ae m o: <e m W m m �o o� m a: m �o m a: m w a; o; w Q 0 N N A A N O O {"I C VI O, Cl m V O V W W N VI A E m a N V VI 1dq Q fb N w pi W O O A N N W A Cf W N O f0 N (7 N A W W O A m O W d VI W A W OI W N O Cl CI W t7 O m A W Cl N W A A A W Ol W N N W L j N N Y pn N N N b N m N m N O W A 10 A N A W N op N N Ifl A O N O N A N W p m W Of O W W W bi O W W co W O co O W W O W O 0 W 0 0 0 O J J J 0 O i a Z J J Q O a b C N O W " a_ w n_ m ro w m t°�a u�i3 �3o o 'm a m z z m a. a 4 a � s N N J J ❑ m m � ai w a W N N J Q a a U S Y Y J O J -L Z m E 4 c ❑w 5 a a r � cc e @ 5 S 4 E c u m c m m -0 m U K m t m a A > A 3 r Z N 0 C ❑ O p ❑ m m T O O O m O y N m n m m O O m Q O Of A O m {my IL O 0❑ o H v o CL m O C O O O Q y O O O m m m w m N C1 Q p 3 E N m N� JJ pw N❑ J ❑ W❑ E a e m c r r Cl c c c e c c w c � U F t w m ti w N y y m m m m` r m n N w m o Q m m N m w o 3 n m w O w Q O N n Q m N Q m N m m t7 m N f0 w n m Q Cf N O W S ch l7 M M Pf w C'l M Q V Q N m n N W C E 0 0 U Q N O O N Q l7 N N n m w jy Cf m Q m O m Q Q Q m N O w O m n m m O m w m Q m Q Q N M O J qr � h 1n N YI 10 fO p 2 � a m w mw wm w o o n e'i m m Q Q m m m m m m m m.6 m m m m N C O 3 E m y M O O O O O Q Q N N n N O L N N N 6 g O Q Q YOf 0 m at O wn Q 0 m m NJ 2 J C O O b ON C A V O C a O A 0a �b North America - ALASKA - BP Lisburne L3 L3-22 L3 -22A L3 -22A WP05A Anticollision Summary Report 21 March, 2019 Company: North America - ALASKA - BP Project: Lisburne Reference Site: L3 Site Error: 0 00usft Reference Well: 13-22 Well Error: 0.00usft Reference Wellbore L3 -22A Reference Design: 1_3-22A WPOSA BP Anticollision Report Local Co-ordinate Reference: Well 1.3-22 TVD Reference: PLAN KB P272 @ 69.33usft (1.3-22A PLAN) MD Reference: PLAN KB P272 @ 69.33usft (L3 -22A PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference L3-22AWPOSA Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,409.33 to 13,849.47usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,580.36usft Error Surface: Elliptical Conic Survey Tool Program Date 3/21/2019 From To (usft) Wall) Survey (Wellborn) Tool Name Description 109.33 9,409.33 1 : Sperry -Sun BOSS gyro multi (1-3-22) BOSS -GYRO Sperry -Sun BOSS gyro multishot 9,409.33 9,800.00 L3 -22A WP05A(1-3-22A) BLIND Blind drilling 9,800.00 9,984.00 1_3-22A WP05A(L3-22A) MWD MWD- Standard 9,800.00 9,984.00 L3-22AWP05A(L3-22A) MWD+IFR MWD +IFR correction 9,984.00 13,849.47 L3 -22A WP05A(1-3-22A) MWD MWD -Standard 9,984.00 13,849.47 1_3-22A WP05A(1-3-22A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) 04 D4-22 - 04-22 - 04-22 10,995.71 12,650.00 373.80 67.17 320.94 Pass - Minor 1200 04 -22 -04 -22A -04-22A 11,101.23 12,460.00 764.42 545.89 252.07 Pass - Major Risk 04 -33 -04 -33B -04-33B 13,113.37 17,295.00 1,367.57 568.11 801.80 Pass -Major Risk L3 L3 -22 -L3 -22-L3-22 9,728.62 9,725.00 35.08 0.07 35.08 Pass - NOERRORS 1.3-24 - 1.3-24 - L3-24 Out of range L3-28 - 1-3-28 - L3-28 Out of range Plan 1-3-26 - Plan 1.3-26 - L3-26 wp09 Out of range 32112019 2:56:42PM Page 2 of 3 COMPASS 5000.1 Build 81D RE Company: North America - ALASKA - BP Project: Lisburne Reference Site: 1_3 Site Error: 0.00usft Reference Well: 1_3-22 Well Error: oo0usft Reference Wellbore 1_3-22A Reference Design: L3 -22A WP05A BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well U-22 PLAN KB P272 @ 69.33usft (L3 -22A PLAN) PLAN KB P272 @ 69.33usft (L3 -22A PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to PLAN KB P272 @ 59.33usft (L3-22 A Coordinates are relative to: L3-22 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK Central Meridien is 150' 0'0.000 W' Grid Convergence at Surface is: 1.59° 1600- 1200- 800- (D 600- � 1200- 0 0 v C 0 re p ^n 800- 0 d U 0 C cc 400_ U 0 0 Ladder Plot 2500 5000 7500 10000 Measured Depth (2500 usftfin) --JZ— 1_328,1_328,1_328V1 -Ar 0422,04-22,04-22 V1 —Z— 0422,0422A,04-22AVO $ 04 3,04-33B4O4336VO $ L324,L3-24,L324V1 $ L331,L331,L331 V1 -*- L331,L3-31PB1,L3-31PB1 VO LEGEND -XF L3-23,L3-23,L323V1 -!r L318,L318,L318V1 -i-- 1_3-15,L315,L315V2 $ L308,L3-08,L-3-O8V1 $ L325,L325,L325VO ♦- L3-30,L330,L3.3OV1 -i- L312,L312,1_312V1 12500 15000 -Ar- Plan L326, Plan L326, L3-26Y4)09V0 -+- L3-11, L3-11, L3-11 V1 $ L322,L322,L322V1 -*- 1_310,1_3-10,L310VO -f L319,L319,L319V1 -Ar L4 -11,L4 -11,L4 -11V1 $ L322AVW405A 31212019 2:56:42PM Page 3 of 3 COMPASS 5000.1 Build 81D r so ME ■■■■■■ o sosoRm� OEM ONE N So ■ $$gt$$FgBo 0 ■■■■� ■■■■1. M , , ■■■■AE�■ QFYN �easssssaeyy�$izPinxi� mai �ii•wwgR �aS�6&mrvN ^€i$nm$e - mom ■■ ■RA■■■■\\\i■■■��■1. ■■■■\i. 1\■■II■1.,, , , , ■�1!\■■■■1\�®®�■■I■1 ■�„■■■■",��7,�m ■■ „ �ME■■■1E■] HA ME ■Mq■■■■■INNI■I■■1,,, ■�■�\■■■1 lMMEM■1.,, ■■■�\■■■Id, /I■■■1 ■\1■■■�I■■■■■■■1:.. OEYM (u!/Nsn 004) (+)9uoN/(-)91nog 39�m SVRRSR�s 632- Noa���IIE-24u5i �s�asssssgsms�s �o oovovo�o�o�o �g^=sss$ass.ssss o _ wee mono 3R�93 S33$a�«o�SS�� w4�6&�S3R333�$^v z -xi Ul gig 20 =3888,««rr88e mSY� R RrrRRg:R���s,a a, �mSos8_Se g�g�r •u3,=a p (uyysn OS) yldad reotuap anal o sosoRm� N fiToy&�s�a�-`6 Ft $$gt$$FgBo ? � 2�mgg'g�gCy�Cg�o�oa. 1019NNN QFYN �easssssaeyy�$izPinxi� mai �ii•wwgR �aS�6&mrvN ^€i$nm$e - 2 Egg 9 EMU 39�m SVRRSR�s 632- Noa���IIE-24u5i �s�asssssgsms�s �o oovovo�o�o�o �g^=sss$ass.ssss o _ wee mono 3R�93 S33$a�«o�SS�� w4�6&�S3R333�$^v z -xi Ul gig 20 =3888,««rr88e mSY� R RrrRRg:R���s,a a, �mSos8_Se g�g�r •u3,=a p (uyysn OS) yldad reotuap anal 9„;;¥¥ jgsggg% #®@! � MEM / !-.g | /t., iuinsn aszl OUMLON oer�: bp North America - ALASKA - BID Lisburne L3 L3-22 L3 -22A 1-3-22A WP05A Plus 500ft MD AOGCC Offset Well Report 21 March, 2019 Company: North America -ALASKA - BP Project: Lisburne Reference Site: L3 Site Error: O.00usft Reference Well: 1-3-22 Well Error: O.DOusft Reference Wellbore _3-22A Reference Design: _3-22A WP05A Plus 500ft MD BP Antioollision Report Local Co-ordinate Reference: Well 1-3-22 TVD Reference: PLAN KB P272 Q 69.33usft (1-3-22A PLAN) MD Reference: PLAN KB P272 @ 69.33usft (L3 -22A PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference L3 -22A WP05A Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria Date 3/21/2019 Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Summary Survey Tool Program Date 3/21/2019 Offset Centre to From TO Measured Centre (usft) (usft) Survey (Wellbore) Tool Name Description 109.33 9,409.33 1 : Sperry -Sun BOSS gyro multi (1-3-22) BOSS -GYRO Sperry -Sun BOSS gym multishot 9,409.33 9,800.00 L3 -22A WP05A Plus 500ft MD (1-3-22A) BLIND Blind drilling 9,800.00 9,984.00 L3 -22A WP05A Plus 500ft MD (1-3-22A) MWD MWD - Standard 9,800.00 9,984.00 L3 -22A WP05A Plus 500ft MID (1-3-22A) MWD+IFR MWD +IFR correction 9,984.00 14,349.47 L3 -22A WP05A Plus 500ft MID(1-3-22A)MWD 2,725.00 MWD - Standard 9,984.00 14,349.471-3-22A WP05A Plus 500ft MID (1-3-22A) MWD+IFR+MS-WOCA MIND +IFR+Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 04 L3 L3-18 - 1-3-18 - 1-118 2,408.46 2,400.00 116.10 1-119 - L3-19 - 1-119 2,738.09 2,725.00 196.56 1122 - 1-122 - 1-122 9,728.62 9,725.00 35.08 L122-L122A-L122A 45.89 45.89 0001 1-3-22-L3-22A-L122A WP05A 13,725.00 13,725.00 0.00 2 1-123 - L123 - 1-123 2,315.67 2,300.00 198.41 1-3-24 - L124 - 1-124 1,959.49 1,950.00 70.36 L3-28 - L128 - 1-128 984.90 975.00 184.61 Plan 1-3-26- Plan _126 - L3-26 wp09 1,076.61 1,075.00 118.38 L4 3/212019 3:29:50PM Page 2 of 2 COMPASS 5000.1 Build BID TRANSMITTAL LETTER CHECKLIST WELL NAME: 1�15_& L -Y- � q / PTD: /Development Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field &Pool PRUDHOE BAY, LISBURNE OIL - 640144 Well Name: PRUDHOE BAY UN LIS L3 -22A Program DEV Well bore seg ❑ PTD#:2190510 Company BE EXPLORATION (ALASKA) INC. Initial Class/Type _ DEV / PEND GeoArea 890 Unit 1]650 On/Off Shore On Annular Disposal —I 2 3 10 11 Appr Date 12 SFD 4/5/2019 13 14 15 16 17 Engineering Appr Date 28 MGR 4/25/2019 29 30 31 32 33 34 Permit fee attached. - . ....... - - - . . 35 Geology 36 Appr Date 37 SFD 4/5/2019 38 Commissioner 39 Permit fee attached. - . ....... - - - . . NA- Lease number appropriate . . . . . . . ...... ........ . . .. Yes - - Surface Location lies within ADL9028322; Top Prod Int & TD lie within ADL0025323. Unique well. name and number - - - - . - Yes Commissioner Well located in a. defined pool - - - - - - - - - - - - _ _ _ _ - _ Yes PRUDHOE BAY, LISBURNE OIL , 640144, governed by CO 2078.. Well located proper distance. from drilling unit boundary. - - - Yes - - - CO 2078, Rule 3. The well spacing unit shall be. one producing well per governmental quarter.section..No. Well located proper distance from other wells- - - - - - - - - - - Yes - pay may be opened in a well closer than 1,000 feet to the pay opened. in another well -or opened in a- Sufficient acreage available in. drilling unit . . . . .... . . .... . - - - Yes well which is closer than -500 feet to the. boundary of the affected area.. As planned, this well will. _ .... .. - If deviated, is wellbore plat. included - - - - - - - - - _ - Yes conform to. the spacing requirements of CO 207B, Rule 3., Operator only affected party- - - - - - - - - - - - ------ - - - - - - - - Yes - - - - Operator has. appropriate. bond in force . .. . ....... . . . . . . . . - Yes Permit can be issued without conservation order- - - - Yes Permit can be issued without administrativeapproval... _ - - - - - ... Yes Can permit be approved before 15 -day wait- - - - - - - - - - - - - .. - - - Yes Well located within area and strata authorized by.lojection Order # (put. 10# in comments) (For- NA. All wells within 1/4 -mile area -of review identified (For service well only). ..... ... - NA.. - - - - - - - - - - - ------- - Pre -produced injector: duration of pre production fess than 3 months. (For service well only) .. NA... - - -- - - - - - - - - - Nonconven, gas conforms to AS31.05,0300.1.A),(J.2.A-D) ---- - - - - - - - ---- - - - - NA - Conductor string. provided - - - .. _ - NA . - Sidetrack from existing 9-5/8" intermediate. casing Surface casing protects all known USDWs - - - - - - - - - - - - -- - - - - - - . NA..... Sidetrack from existing 9-5/8" intermediate casing CMT vol adequatetocirculate-on conductor & surf.csg .......... - _ - _ - - ... - NA- - - - Sidetrack from existing 9-5/8" intermediate casing - - CMT vol adequate to tie-in long string to surf mg- . . . . . . . . . . . . ............ . NA- Sidetrack from existing 9-5/8" intermediate. casing - - CMT.will cover all known productive horizons- - - - _ _ - - - - - - - - .. Yes Fully cemented intermediate and production casing Casing designs adequate for C, T, B & permafrost.... - - - - - .. Yes Adequate tankage -or reserve pit - - - - - - - . Yes Parker 272 is an ongoing operation - - If a-redrill, has. a 10-403 for abandonment been approved - - - - - - - - - - - - - - - - - - - - Yes On a separate sundry- Adequate wellbore separationproposed. . . . . . . . . ......... . . - - - _ .... Yes - Wellbore.meets-all BP separation rules.......- If.d[verter required, does it meet regulations_ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ NA Sidetrack from existing 9-5/8" intermediate casing Drilling Fluid. program schematic & equip list adequate- - - ....... - - - - - .. Yes All fluids should -be overbalanced to reservoir .. BOPEs, do they meet regulation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - _ 5M BOPE tested to 3500 psi,.$ ram, 1 annular BORE -press rating appropriate; test to (put psig in comments)_ - - - - - - - Yes 5M BORE Jested l0 3500 psi . .. . . . . . . . . ........ . Chokemanifold complies w/API RP -53 (May 84)- - - - - - - - -------- - - - - - - - - -- Yes Work will occur without operation shutdown- - - - --- -- - - - - - - - - - _ .... - - Yes - Parker 272 is an ongoing operation - - - - - - - - - - - - - - Is, presence of H25 gas. probable . ....... . . . . . . . . . . - - - .. Yes L3 is an H2$ pad: BE H2S monitoring and controls will be in place Mechanical.condition of wells within AOR verified (For service well only) ---- - - - - - - - - - - NA.. - - - - - This well is a producer Permit can be issued w!o hydrogen. sulfide measures . . . . ..... . . . . . . . ...... No. - - - - - - L3-Pad.wells are H25-bearing-1-12$.measures, are required. Datapresentedon potential overpressure zones .. . . . .. . ... . . . . . . ... . . . . . . . Yes _ .... Planned mud weights appear adequate to control the, operator's forecast of most IikEly pore pressures, .. Seismic analysis of shallow gas. zones .... . . . . . . . . . . . ....... . . . . . . . . NA, _ , - - High likelihood for encountering lost circulation within. Lisburne as discussed in the Drilling Critical - Seabed condition survey (if off -shore) ............... . . . . . . . ... . - NA........ Issues section of this application, - - - - - Contact name/phone for weekly. progress reports[exploratoryonly] ......... . . . . . . . NA _ - - - - - - .......... Geologic Engineering Public High likelihood for encountering lost circulation within Lisburne as discussed in the Drilling Critical Commissioner: Date: Commissioner: Dale Commissioner Date Issues section of this application. Y12-611