Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
219-056
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:219-056 6.50-029-21382-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12881 11813 8727 8732 7940 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 32 - 112 32 - 112 1490 470 Surface 2464 13-3/8" 31-2495 31-2495 5380 2670 Intermediate 9043 9-5/8" 29 - 9072 29 - 8259 6870 4760 Liner 8796 7" 27 - 8823 27 - 8025 7240 5410 Liner 416 7" 8821 - 8415 8023 - 8415 8160 7020 Perforation Depth: Measured depth: 10150 - 11795 feet True vertical depth:8711 - 8728 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 25 - 8806 25 - 8009 8732 7940Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Hydro Set Packer Liner 4117 3-1/2"x3-1/4"x2-7/ 7712 - 11829 7011 - 8727 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 26815926696279 7333355 1672 101 202 207 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Torin Roschinger torin.roschinger@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:907.564.4887 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8762 Sundry Number or N/A if C.O. Exempt: 321-064 Junk Packer Printed and Electronic Fracture Stimulation Data 5 CTU Extended Perforating Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028325 PBU 11-11A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:18 am, Jun 22, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.06.21 12:47:51 -08'00' Bo York SFD 6/23/2021MGR30JUL2021DSR-6/24/21 RBDMS HEW 6/28/2021 SFD 6/23/2021 ACTIVITYDATE SUMMARY 5/27/2021 CTU6 1.75" CT Job Scope: Drift/Log & Adperf MIRU CTU6. Make up TBird CTC/MHA & 2.20" HES Logging GR/CCL/2.24" JSN . Bullhead 5 bbls MEOH followed by 170 bbls of 2% slick SKI w/Safelube down 13CR tubing. ***Job in Progress*** 5/28/2021 CTU6 1.75" CT Job Scope: Drift/Log & Adperf RIH w/HES Logging BHA w/2.24" JSN. Tag up 11,053' ctm, repeat w/same tag depth. Logged 11,053' ctm - 9,000' ctm at 50 fpm. Painted coil flag @ 10,098.4' ctm. Pooh and downloaded log data, -18.50 depth correction verified by OE. MU 500' of HES 2" Millennium guns and RIH. Correct depth at flag, RIH and shot interval 10,150- 10,650'. Pooh w/Gun Run #1. Lay down 500' of HES guns while on continuous hole fill .5 bpm. Secure well, RDMO CTU6. ***DSO will pop well*** Daily Report of Well Operations PBU 11-11A Operator Name:2. Exploratory Development Service 5 Permit to Drill Number:219-056 6.API Number:50-029-21382-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028325 Property Designation (Lease Number):10. 8. PBU 11-11A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Op Shutdown GAS GSTOR WAG SPLUG Abandoned Oil 5 WINJ Exploratory Development 5Stratigraphic Service WDSPL 12. Attachments: PRESENT WELL CONDITION SUMMARY 12881 Effective Depth MD: 13Cr80 11. 4/1/2021 Commission Representative: 15. Suspended Contact Name: Torin Roschinger Contact Email: Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Yes No Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8762 Effective Depth TVD:Plugs (MD):Junk (MD): Other Stimulate Re-enter Susp Well Suspend Plug for Redrill Perforate Perforate New Pool 8732, 7940 No SSSV Installed Date: Liner 4117 3-1/2"x3-1/4"x2-7/8" 7712 - 11829 7011 - 8727 Well Status after proposed work: 16. Verbal Approval: Change Approved Program 32 - 112 29 - 9072 29 - 8259 14. Estimated Date for Commencing Operations: BOP Sketch 31 - 2495 Conductor 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S-3 Hydro Set Packer 10820 - 11795 8714 - 8728 4-1/2" 12.6# 13Cr80 25 - 8806 Liner 11813 8727 none none 31 - 2495 2670 9-5/8" 7" Contact Phone:(907) 564-4887 Date: 1/29/2021 5410 2464 538013-3/8"Surface 4760 GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 80 20"32 - 112 470 Intermediate 9043 6870 Liner 8796 27 - 8823 27 - 8025 416 7"8821 - 9237 8023 - 8415 8160 7020 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. No 5Yes Casing Length MD TVD Burst 1490 Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. CTU extended perforating 55 Torin.Roschinger@hilcorp.com By Samantha Carlisle at 8:22 am, Feb 02, 2021 321-064 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.02.01 15:42:19 -09'00' Bo York 2470 MGR02FEB21 DLB 02/02/2021 10-404X DSR-2/2/21 Yption Required? Comm. 2/3/21 dts 2/3/2021 JLC 2/3/2021 RBDMS HEW 2/3/2021 Add Perf Procedure 11-11A PTD: 2190560 Well Name: 11-11A Add Perf API Number: 50-029-21382-01 Current Status: Flowing Rig: SL & CTU Estimated Start Date: 04/1/2021 Estimated Duration: 2 days Regulatory Contact: Carrie Janowski Permit to Drill Number: 2190560 First Call Engineer: Torin Roschinger (406) 570-9630 (c) Second Call Engineer: AFE Number: IOR 50 Current Bottom Hole Pressure: 3337 psi @ 8,800’ TVD 7.3 PPGE | SBHPS taken as analog from offset 11-39. Maximum Expected BHP: 3350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure: 2470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 1000 psi (Taken on 3/16/2020 from slickline) Min ID: 2.31” ID – 2-7/8” X Nip in PTSA @ 7712’MD Max Angle: 92 Deg @ 10430’ Reference Log: Baker RPM - Log Dated 11-Nov-2019 Brief Well Summary: 11-11A is a new CST completed in Z2A in August 2019. The well was underperforming relative to expectations and just 3 months after the well was drilled, 242’ of additional addperfs were shot in Nov 2019. During the perforating operations coil tagged down at 11478’ and were unable to m ill through the obstruction indicating damaged liner leaving the remaining 335’ of liner inaccessible. Objective: The objective of this procedure is to shoot 500’ of heel perfs from 10150-10650’ that were designated as a future opportunity during the initial completion to get more footage open in Z2A and increase production. This will add rate and provide more uniform drawdown along the lateral. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 165 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 137 bbls b. 4-1/2” Tubing - 7712’ X .0152bpf = 117 bbls c. 3-1/2” Liner - 897’ X .0079bpf = 7 bbls d. 2-7/8” Liner – 2211’ X .0056bpf = 13 bbls * Add Perf Procedure 11-11A PTD: 2190560 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Tag obstruction at 11478’ctmd encountered by coiled tubing during milling operations on 11/10/2019 prior to logging OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. 6. At surface, prepare for deployment of TCP guns. 7. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 8. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 9. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. 11-11A Addperf Schedule *HES 2” guns were used to estimate for this job. If unavailable, use another vendor as needed. Perf Interval Perf Length Gun Length Weight of Gun (lbs) 10150-10650 500 500 2800lbs (5.6ppf) 10. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 11. POOH. Stop at surface to reconfirm well dead and hole full. 12. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 13. RDMO CTU. 14. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet Assure excess fluids available if need to keep hole full. * See note above regarding kill methods if pressure observed on surface after perforating. Standing orders flow chart included with this sundry request. Add Perf Procedure 11-11A PTD: 2190560 Coiled Tubing BOPs Add Perf Procedure 11-11A PTD: 2190560 Equipment Layout Diagram Add Perf Procedure 11-11A PTD: 2190560 Standing Orders for Open Hole Well Control during Perf Gun Deployment Add Perf Procedure 11-11A PTD: 2190560 11-11A Mini Log Add Perf Procedure 11-11A PTD: 2190560 11-11A Tie-In Log Add Perf Procedure 11-11A PTD: 2190560 Add Perf Procedure 11-11A PTD: 2190560 Add Perf Procedure 11-11A PTD: 2190560 Add Perf Procedure 11-11A PTD: 2190560 Current Wellbore Schematic Add Perf Procedure 11-11A PTD: 2190560 Proposed Schematic STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED npr , o min 1. Operations Performed --.- Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operation -A C1V❑ Suspend ❑ Perforate 0 Other Stimulate ElAlter Casing 11Change Approved Program ❑ Plug for Reel ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 219-056 3. Address: P.O. Box 196612 Anchorage, AK 89519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-21382-01-00 7 Property Designation (Lease Number): ADL 028325 8. Well Name and Number: PBU 11-11A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12881 feet Plugs measured None feet true vertical 8762 feet Junk measured None feet Effective Depth: measured 11813 feet Packer measured 8732 feet true vertical 8727 feet Packer true vertical 7940 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 32-112 32-112 1490 470 Surface 2464 13-3/8" 31-2495 31-2495 5380 2670 Intermediate 9043 9-5/8" 29-9072 29-8259 6870 4760 Liner 8796 7" 27-8823 27-8025 7240 5410 Liner 416 7" 8821 -9237 8023-8415 8160 7020 Liner 4117 3-1/2" x 3-1/4" x 2-7/8" 7712-11829 7011 -8727 Perforation Depth: Measured depth: 10820 - 11795 feet True vertical depth: 8714-8728 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 25-8806 25-8009 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Hydro Set Pkr 8732 7940 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 162 181 3923 1336 384 Subsequent to operation: 717 1566 3014 1321 266 14. Attachments: frequlred Per 20 Me 25.070.25,071, &25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Alatalo, Travis Contact Name: Alatalo, Travis Authorized Title: Production Engineer Contact Email: Travis.AlataloQbp.com Authorized Signature: (�-"i�e�' �LrG--moi Date: Contact Phone: +1 9075645351 Form 10-404 Revised 04/2017 " ' Z/ r `�Az—kzthe ) 9 3SDMS rX/ DEC 19 2019 Submit Onginal Only Daily Report of Well Operations PBU 11-11A ACTIVITVnATF •Mv (LRS Unit 72 - Assist Coiled Tubing: Freeze Protect Flowline) Road to location, Arrive on location, Sign in with CTU, Sign onto RAP, Spot equipment, Begin RU to choke trailer ***WSR Continued on 11/9/2019 11-10-19*** CTU #8 1.75" coil 0.156WT Objective: RPM log, cont CIBP, cont Adperf LRS finish FP the flowline. Load well with 150 bbls 1 % slick KCL w/ Safelube and 10 bbl 60/40 meth cap. RIH w/ 2.26" DJN. Tag obstruction at 11475' CTM. Unable to jet past. POOH. MU/RIH with 1.69" milling bha + 2.30" 4 bladed junk mill. Unable to get passed 11472' CTM. Experienced 7 hard stalls all at this depth. Discuss with town. Plan forward to try with a 2.30" diamond parabolic mill. Experience chrome drag off bottom. FP coil and 10bbl meth cap. MU & RIH w/ 1.69" milling bha + 2.30" diamond parabolic mill. Tag obstruction at 11478' CTM. Mill on obstruction 11/10/2019 ***Job continued on 11/11/19 WSR*** CTU #81.75" coil 0.156WT Objective: RPM log, cont CIBP, cont Adperf Continue milling with 2.30" diamond parabolic mill. After —2 hours of milling, only make —0.5' of progress into obstruction and it is fairly sticky getting off of it. POOH to proceed with perforating. Trim 100' pipe, perform chain inspection and change packoffs. Town changed their mind and wants to proceed with RPM log prior to perforating. MU/RIH with Atlas logging RPM. Load well with 160 bbls 1% slick KCL w/ safelube. Log down from 7200'- 11450' at 30 fpm. Log up from 11450 - 9100' at 30 fpm. Pump borax solution down backside, push 30 bbls at 5 bpm into the perforations then log down from 9100'- 11450' while pumping borax. Pump 60 bbl borax push then log up from 11450' - 7200' at 30 fpm. Paint orange flag at 11100'. 11/11/2019 ***Job Continued on 11/12/19 WSR*** CTU #8 1.75" coil 0.156WT Objective: RPM log, cont CIBP, cont Adperf Finish logging at 30 fpm to 7200'. Pump 215 bbl 1 % slick KCL w/ Safelube flush behind borax. POOH. Confirm good data (+16' correction, correlated to Baker RPM dated 31 -July -2019). MU/RIH with gun #1 31' of 2" Power Jet. Perforate 11099'-11130'. POOH. Pump 30 bbls 1% slick KCL w/ Safelube down backside with 5 bbl 60/40 cap. Confirm shots fired, ball recovered. MU & RIH w/ gun #2, 31' of 2" PowerJet. Perforate 11070'- 11101'. Pump 5 bbl 60/40 cap down backside. POOH. 11/12/2019 ***Job Continued on 11/13/19 WSR*** CTU #8 1.75" coil 0.156WT Objective: RPM log, cont CIBP, cont Adperf Finish POOH. Confirm shots fired, ball recovered. Trim 100' pipe. MU & RIH w/ HES memory GR/CCL logging tools. Tag obstruction at 11478.7' CTM. Paint flag at 11000' and log up to 9150'. MU/RIH with gun #3 30' of 2" PJ. 31.33' of loaded to perforate 11,040-11071'. Pump 70bbl safelube CTBS for chrome drag + 101bbl FP cap. POOH. Confirm shots fired, ball recovered. MU & RIH w/ gun #4 of 30'2" PJ. Perforate 11010'- 11041'. POOH. 11/13/2019 ***Job Continued on 11/14/19 WSR*** CTU #8 1.75" coil 0.156WT Objective: RPM log, cont CIBP, cont Adperf Finish POOH w/ gun #4. Confirm shots fired, ball recovered. BOP test. Change packoffs and trim 100' pipe. MU/RIH with gun #5 30' of 2" PJ (31.33' loaded). Perforate 10909-10940. Pump safelube CTBS for chrome drag, 38bbl 60/40 freeze protect cap. POOH. *Will return to shoot the remaining 3, 2", 30' guns when SLB TCP has the materials.* 11/14/2019 ***Incomplete*** 11/19/2019 LRS Unit 42 - Heat Uprights 087 & 4471 to 120* for CTU CTU #8 1.75" coil 0.156WT Objective: Adperf MIRU CTU. Start BOP test. 11/28/2019 ***Job Continued on 11/29/19 WSR*** Daily Report of Well Operations PBU 11-11A **LRS Unit 42 Heat tanks for Coil** Circulated 170 bbls of I% slick KCL in tank 087. Starting Temp= 50* F Ending Temp= 100* F Circulated 70 bbls of 1 % slick KCL in tank 4471. Starting Temp= 50* F Ending Temp= 86*F 11/28/2019 ***WSR Continued on 11/29/2019*** *** WSR Continued from 11/28/2019*** (LRS 42 Heat Tanks For Coil) Circulated 215 bbls of 1 % KCL from tank # 4471, Starting Temp= 50*F Ending Temp=100*F 11/29/2019 ***Job Complete*** CTU #8 1.75" coil 0.156WT Objective: Adperf Complete BOP test. Load well w/ 145 bbls Slick 1% KCI w/ Safelube Perfortate 10880' - 10910'w/ SLB 2.0" Power Jet guns, 6 spf, 60* phasing Load well w/ 118 bbls 1% slick KCL w/ a elube. Perfortate 10850' - 10880'w/ SLB 2.0" Power Jet guns, 6 spf, 60* phasing wl gun . 11/29/2019 ***Job Continued on 11/30/19 WSR*** CTU #8 1.75" coil 0.156WT Objective: Adperf Continue RIH w/ gun #3. Perfortate 10820'- 10850'w/ SLB 2.0" Power Jet guns, 6 spf, 60* phasing. Freeze protect well with 38 bbls 60/40. Confirm shots fired, ball recovered. RDMO. 11/30/2019 ***Job Com tete*** 13-3/8" 11 11 A SAFETY NOTES: ***4-112" CHROME TBG***CHROME LNR***TOP JOINT OF 13318" CSG IS 68#I1(55 WITH BURST RATE OF 3450 PSI. WELL I IMT ANGLE > 70' @ 9579'. MAX DLS: 29.2" @9624. D= 12.347" H 2495' 7• TIEBACK CSG, 26#, LAO TCI, D = 6276' 2959' - Minimum ID = 2.31" @ 7712' 2-7/8" X NIPPLE IN PTSA TOP OF LNR ]718• 3-12• LNR, 9.3#,13CR-85 TCI,.0087 bpf, D =2.992"7766' - 3-1/4'LNR,6.6#,13CRA5TC11,.0079bpf,D=2.85' 8609' 1 8800' I 52 bpf, D = 3.958" 7' TIEBACK CSG, 26#, LA0 BTC -M. ID = 6.276" 8818' TOP OF 7" LNR 8821' ' 19-518" CSG, 47#, L-80, D=8.681" 4-1/2'X 7' DELTA WHIPSTOCK (06/06/19) -1 9072' 9232' 7" LNR, 299, L-80_0371 bpf, D = 6.184" -9232' PERFORATION SUMMARY REF LOG: BKR ATLAS RPM ON 08/10/19 ANGLE AT TOP PERF: 89' @ 10820' Note: Refer to Prodwbon DB for historical perfdata S¢E SPF I INTERVAL OprwSqz SHOT SOZ 2' 6 10820-10850 O 11/30/19 5458 5126 2" 6 10850 -10910 O 1129119 4 2" 6 10909-10940 O 11/14/19 0 0820/14 2" 6 11010-11071 O 11/13/19 BK 2" 6 11070 -11130 O 11/12/19 DMY 2" 6 11340-11545 O 08/11/19 KBG2 2" 6 11575-11795 O 08/11/19 7718' PBTD 11813' - 2-718"LNR,6.5#,13CRASSTL,.0058bpf,D=2.441° 11829' TD 12881' FESX NP, D=3.813" 57 MD TVD DEV TWE VLV ILATCHIPORTI DATE 6 35473516 25 KBG2 DOME BK 16 08/17/19 5 5458 5126 35 KBG2 SO BK 20 08/17/19 4 6408 58971 35 1 KBG2 DMV BK 0 0820/14 3 7229 65831 31 1 KBG2 DMY BK 0 05/16/06 2 8008 72761 25 1 KBG2 DMY BK 0 05/16/06 1 8620 78351 22 1 KBG2 DMY SK 0 1223/18 7712' 45 KB B LTP w/PTSA (08/16/19) 7718' 3.70'DEPL0FYSLV,D=3.00' 7721' 2-7/e" X NP, D =2.31' 3-12"HESXNP,D=2.813• 7744' 7756' H3-1rz•x3-3/ts°xo,0=z.7as• 8609' I4-12" HES X NP, D = 3_813 J 8727' 7" X 4-1/2" BKR S-3 PKR D = 8768' �4-12"HESX NP, ID=3.813" 8787' 4-12°HES XN NIP. ID =3.725" 8800' I-11-v2"WLEG,0=a956"i ELMDTTNOTLOGGED 8821' '— 9-5/8" X 7" -KR & TIEBACK. 3.870" MILLOUT YMDOW (11-11A) 9237' - 9246' DATE REV BY COMMENTS DATE REV BY COMMENTS 07MI185 ORIGINAL COMPLETION 0820/19 MTWJMD SETLTP wl PTSA & X NP (08/16/19) 1024189 RWO 10101/19 TWJMD F14ALODEAPPROVAL OSM7106 016 RWO 12102/19 KFWJMD ADPERFS 08/12119 N-CDR2 CTD SN)ETRACK (11-11A) 08/15/19 JMD DRLG HO CORRECTIONS 0820/19 JPKIJMD GLV C/O (08117/19) SEC PRUDHOE BAY UNrr WELL: 11-11A PERMrTNo: 219-056 API No: 50-029-21382-01 BP Exploration (Alaska) A a O O N 0 O O N U'1 ❑ W LL ❑ W LL - Y ❑ � \ \\i m _S Q W JI W JI N U X F W M O Z ❑ LL Q LL Q VI t% U LL N WI JI z JI z U N ~ Q WI Q LLI > > m Q N O Y Yl O LL N VJ (n N �i C LL O r d LL coN D O 6 O N �� ❑ � ❑ � N N J J j'. N N ❑ O N d O H F LL LL fn fn ¢ j Z Z E E U al rnI rnl rn� m m m m ~y m a � IL W U U U (7 Q Q Q Q S Q Q (� Oi 0 N z N N N N N N N N N N N N c F d ❑ LLIU NI E IL w EP N )i ll � H NLr ll p_ Nl yi IL H ll IL ll IL N IL d lL IL N IL L E o❑— 4 ly v IU af v Iy u_ IU v v p IY ti N E 'c = 'c K 'c of "c K "c K —I 4 4 4 " 4 4 C r O O mI O (7 U O (D S O (D U O (D 2 O O O O O N O O o (J () U ¢p QI a Q❑ Q QI= Y N N S N Q❑ N S N O d d d N O N N W �M W.-J W W W W W W W- W W W -m O Q U IL W O N W N N N N m N N N N N N N N LL O O K '- 7 a W W U m J 0u 0 Q 0 q a O � � N y J o (L 01 =r� o N N N m ON n N N U = E o n E J� Q a 0: z0 f m O d Z o Jf C � N G Y N d J 0 O d a a o > m pl a a z E z U 0 d U o U E � � m z D 0 2 vj m m m m m m m m m m m m m 0 w E o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Z m A m m m m m m m m m m m O m m m m m m m m m rn m m m O ❑ z o 0 0 0 0 0 0 0 0 0 0 0 0 > O O Q d c N N 0 O c ° N O W O Z OW < a E E _ Z O O ! LL O O K Z J o O f U U U U U U U U U U U U U E 0 Q c w 0 0 J; w w w w w w w w w w ❑W ❑W J OO ~ W A a GO F. G L O 0 0 O N W WI z Z OJ N LL Q " N > m Q $ O > U a m Q C7 m d d no Q W O U U J p � off'`-. _ ❑ y Y O aN n w m .off=I E 6Zi m C6 N m d Q �w oo W E U '0 > > W im❑ _rn N La m d � ❑ LL a c U o E (n E rn o WO_ '� N m d N 2 O � N N O d W x W O E LL E " U m J O d � N 0 4 E � E Z N m J 0 C J m J m o aM O N c d U U CO O O N c N O N d o U E Q Z c u i d E J a 0 E Q 0 0 m U Z y O — c Q h' d ❑ N E W � � VI O O N c d c D Q N c O QO 6 N ❑ m 2 � d N m N a Of m Z N O ~ o v m w E a W p O N N m in dK Z N F m U d c p m N y c2 Q o CO Q c o❑ m o in .E U U 'aU CL 6 mO EE a o Up7Z— UU❑❑ E xd V W 3 a ( GO F. G L O Baker Hughes PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc. WELL NAME IA FIELD Prudhoe Bay Unit 219056 3141P; Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, 1-112-1 ) E. Benson Blvd. :h, AK 99508 or GANCPDC@bp365.onmicrosoft.com COUNTY PRUDHOE BAY LOG TYPE GR - RES BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a)bhge.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TOP O. BOX) PERSON ATTENTION V t BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Beason Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G street I Anchorage. AK 99501 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 'late 01 Alaska -AVGCC Atm: Natural Resources Technician 11 1333 W. 7th Ave, Suite 100 .Anchorage, Alaska 99501 No LOG DATE August 1, 2019 TODAYS DATE November 7, 2019 Revision Details: Rev. Requested by: FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Survey I (Compass) # OF PRINTS It OF COPIES 17 OF COPIES 19 OF COPIES NOV 0 8 2019 AO(;rir 5 DNR - Division of Oil & Gas *** 1 Attn: Resource Evaluation 5511 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Christopher Ratzlaff TOTALS FOR THIS PAGE: 0 1 4 1 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL /MPLETION OR RECOMPLETION REPO AND LOG la. Well Status: Oil [a Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ ib. Well Class: • 2❑AAC 25.105 20AAC 25.110 Development ® Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Service ❑ Stretigrephic Test ❑ 2. Operator Name: 6, Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 8/12/2019 219-056 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 7/24/2019 50-029-21382-01-00 4a. Location of Well (Governmental Section): 8. Date TO Reached 16, Well Name and Number: 7/30/2019 PBU 11-11A Surface: 921' FSL, 328' FEL, Sec. 28, Tl lN, R15E, UM 1 9 Ref Elevations KB 58.00 ' 17. Field/Pool(s): C Top of Productive Interval: 3800' FSL, 1329' FEL, Sea 28, T11N, R15E, UM : GL 24.73 r BF 29.36 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18, Property Designation: Total Depth: 2646' FSL, 16(13' FWL, Sec. 27, T11N, R15E, UM r 11813'/8727' ADL 028325 1 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11, Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 707198 y- 5952636 Zone - ASP 4 4 12881'/ 8762' r 70-054 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MDrrVD: TPI: x- 706111 y- 5955487 Zone - ASP 4 Total Depth: x- 709137 y- 5954416 Zone - ASP 4 ' None 1900' (Approx.) ' 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Laleral Tap Wndow MDRVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9237'18415' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jeweand edoration record. Acronyms may be used. Attach a separate page if necessary gi tC E I V E D MAW/GR/RES, GR/CCL/RPM SEP 0 5 2019 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MO SETTING DEPTH TVD HOLE SIZECEMENTING RECORD AOG C OU T TOP BOTTOM TOP BOTTOM 20" 91.5# Iwo 32' 112' 32' 112' 30" 370 sx PF 13-3/8" 68#/72# K-5sL-80 31' 2495' 31' 2495' 17-1/2" 2500 sx PF'E', 400 sx PF'C', 100 sx PF'C' 9-5/8" 47# L-80 29' 9072' 29' 8259' 12-1/4" 500 sx Class'G'. 300 sx PF'C' 7' 26# L-80 27' 8823' 27' 8025' Tieback 157 sx UteCrete, 806 sx Class'G' 7" 29# ow 8821' 9237' 8023' 8415' 8-1/7 340 sx Class'G' -1/2"x3-1/4" x2-7/8" 9.34/6.6# /6.5# tires 1 7712' 11829' 7011' 8727' 4-1/8" 213 sx Class'G' 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number, Date Pam): GRADEDEPTH SET (MD) PACKER SET (MWTV 4-112"12.6# 13Cr80 8806' 8732'/7940' 2" Gun Diameter, 6 apt 8/11/2019 11340'-11545' 8721'-8725' • 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11575'-11795* 8725' - 8728' . (;IMPLETION used during runic an pr yes ❑ NO D Was 0 AAC Per 20 AAC 25.283 (i)(2) attach electronic and printed zal 1 information DEPTHINTERVALWO) AMOUNT AND KIND OF MATERIAL USED VE— RI IEDr�I —2500' Freeze Protect w/ 38 Bbis Diesel, 6 Bbls 50/50 Meth 27. PRODUCTION TEST Data First Production: August 20, 2019 Method of Operation (Flowing, gas lift, .).Gas Lib Date of Test: 6/22/19 Hours Tested: B Production for Test Period �► Oil-Bbi ( Gas -MCF (4 Z Water -Bbl 25 Choke Sive: 85 Gas -Oil Ratio: 1455 Flow Tubing 0 Press Casino Press I 1268 Calculated 24 Hour Rate y Oil -Bbl: 481 Gas-MCF 2886 Water-Bbl: ]OD Oil Gri- API (com: 272 Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only YrGB Io/�jq RBDM%& SEP 112019 OGVe(411111 28. CORE DATA Conventional Cores) Yes ❑ No RI Sidew ill Cores Yes ❑ No IZZ If Yes to either question, list formations and intervais cored (MD+TVD of top and bottom of each), and summarize umology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost -Top Well Tested? Yes ❑ No a , Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 9552' 8680' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. CGL -Zone 3 9338' ' 8514' Base of CGL - Zone 2C 9369' I 8544' - 23SB - Zone 28 9481' 8639' 21TS - Zone 2A 9552' / 8680' Formation at total depth: Zone 2A 19552 8680' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Hyatt, Trevor Authorized Title: M S cialist Contact Email: Trevor.Hyatt@bp.cem Authorized Signature: le: EWAContact Phone: +1907 564 4627 INSTRUCTIONS General: This form is designed For submitting a complete and correctwell completion reportand log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry reportwhen the downhole well design is changed. All laboratory analytical reports regarding samples or tests from swell must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Farm 10-407 Revised 512017 Submit ORIGINAL Only J M D D R., F T 11 11 A SA Y NOTES: NR"T" CHROME TBG 'CHROME LNR"OP JOINT OF 13-3I8" CSG IS 6811/K55 WITH BURST RATE OF 3450 PSI. WELL ANGLE > 700 @ 9579'. MAX DLS: 29.2' @9624'. 209T — 4-12- HES X NP, D = 3.813' I H GAS LFTMANDRELS 13-3/8' CSG, 68/72#, K -55/L-80, D = 12.347" I -j 2495' r 7- TIEBACK CSG, 26#, L-80 TCI, D =6276' 2959' - Minimum ID = 2.31" @ 7712' 2-7/8" X NIPPLE IN PTSA TOP OF LNR —f7718' 3-12" LNR 9.3#, 13CR-85 TC8..0087 bpf, D = 2.992' 7756' �' 3-1/4'LNR6.6#.13CR4t5TCII..0079bp(D=2.85' 1 86 4-12- TBG, 12.6#, 13CRVAM TOP, I� 8800' F .Of 52 bpf, D = 3.958' TIEBACK CSG, 26#, L-00 BTC -M, ID = 6276' 8818' TOP OF 7" LNR 8821' 1 9072' 42" X 7" DELTA WHIPSTOCK 7" LNR, 29#, L-80..0371 bp( ID PERFORATION SUMMARY REF LOG: BKRATLAS RPM ON 08/10/19 ANGLE AT TOP PERF: 91" Q 11349 Note: Refer to PmdLcbon DB for Nsborical pertdata SIZE SPF INTERVAL I OprdSqz I SHOT I SQZ 2' 1 6 11340-11545 O 08/11/19 2" 6 11575-11795 O 08/11/19 PBTD 11813' 13CR-85 STL, .0058 bpf, D = 2.441" 11828' ® 12881' ST MD TVD DEV TWE VLV LATCH PORT DATE 6 3547 13516 1 25 KBG2 DOME BK 16 08/17/19 5 5458 5126 35 KBG2 SO BK 20 oam 7/19 4 6408 i97 35 KBG2 DMV BK 0 0820/14 3 7229 6583 31 KBG2 DMY BK 0 05/16/06 2 8008 7276 25 KBG2 DMY BK 0 05/16106 1 8620 7835 22 KBG2 DMY BK 0 1223/18 1 7712' H45 KB BKR LTP VdPTSA (08/16119) 7718' 3.70' DEPLOYSLV,D 7721' 2-7/8' X NP, D = 231' 7744' 3-12' HES X NP, D = 2813- - 813' 3-12' X 3-3/16' XO, D - 2.786' 8609' 3-3/16' X 2-7/8' XO, ID = 2.377- i 8686' 4-12" H6 X bP, D = 3.813- 8727' 7" X 4-12' BKR S-3 PKR D = 3.870' 6768' —14-12' HES X NP, D = 8787' 4-12" HESXN NIP, ID=3.725' { 8800' I4-12" WLEG, D = 3.958' ��ELMDTi NOT LOGGED 9-51W X 7" PKR 8 TIEBACK DATE REV BY COMMENTS DATE REV BY COMMENTS 07/1 1185=D16RVVD COMPLETION 0820119 MTH/JMD SET LTP Od PTSA 6 X NP (08/16/19) 1024188 RIND DSH7in08112N9 RACK (11-117408115/19ORRECTDNS 0820/19 8/17/19) MILLOUT WINDOW (11-11A) 9237' -9246' PRUDHOE BAYUNR WELL: 11-11A PERMIT No: 219-056 API NO: 50-029-21382-01 I, T11 N, R15E, 921' FSL 8 328' FEL BP Exploration (Alaska) Printed 9/3/2019 4:501OPM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 1 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3-019G4-C: (2,565,163,00) Project: PBU Site: 11 Rig Name/No.: CDR-2 Spud Date/Time: 6/27/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) _ Date From -To Him Task Code NPT Total Depth Phase Description of Operations __ __ _ (hr) (usft) _ 7/21/2019 18:00 - 19:00 3.00 MOB P PRE PRE JOB SAFETY MEETING WITH CREWAND TRUCK DRIVERS. - EMPHASIS ON GOOD COMMUNICATION, VERIFY STOP COMMAND. - STOP BLOCK IN PLACE TO PREVENT RIG FROM ROLLING BACKWARDS INTO WELL. - VALVES ON TREE SHUT IN. IA PRESSURE 0#, WSUPT DAVE NEWLON GAVE OK FOR THE SUSTAINED OA PRESSURE - DRILL SITE OPERATOR NOTIFIED AND DECLINED WITNESSING RIG MOVE OFF OF WELL. - ANYONE CAN STOP THE JOBAT ANYTIME. BE WATCHFUL MOVE PITS AND RIG MODULE OFF WELL. GET LINED UP ON PAD INSTALLJEEPS. SECURITY ARRIVED AT 16:30. 19:00 - 00:00 5.00 MOB P T PRE BEGIN MOVING RIG TOWARD DS11-11A. RIG AT LPC TURN OFF AT MIDNIGHT 7/22/2019 0000 - 03:30 3.50 MOB P PRE CONTINUE MOVE TO DSII MOVING AROUND FS2 AT CURRENT TIME _ARRIVE DS II. _ -03.30 - 15:00 11.50 MOB P PRE MIRU OVER WELL 11-11A - RIG ACCEPT 04:30 HRS - CONDUCT PJSM FOR RIG UP CHECKLISTS. - COMPLETE RIG UP CHECKLISTS. - SPOT TIGER TANKAND AUXILLIARY EQUIPMENT. - LTT ON TREE VALVES THEN REMOVE TREE CAP AND INSTALL BOPS. _ 1500 - 1600 1.00 MOB P PRE PERFORM RIG EVAC DRILL (MUSTER 3 MIN) HOLD PRESPUD MEETING WITH DRILL CREW 16:00 - 19:00 3.00 1 MOB P PRE SERVICE TREE VALVES. M/U INJECTOR. VALVE CREW VERIFIED TORQUE CIRCULATE FRESH WATER FORWARD TO FILL REEL. 1900 - 2000 1.00 MOB P PRE PERFORM SHELL TEST TO 4500#. GOOD TEST - NOTIFIEDAOGCC LOU LAUBENSTEIN OF PASSING SHELL TEST Printed 9/3/2019 4:501OPM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 2 of 19 Common Well Name: 11-11 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 7/21/2019 End Date: X3 -019G4 -C: (2,565,163,00) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Daterrime: 6/27/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations - - (hr) (usft) 20:00 - 00:00 4.00 BOPSUR P PRE INITIAL ROPE TEST PER BPAND AOGCC STANDARD. WITNESSED BY AOGCC LOU LAUBENSTEIN -TEST H2S/LELGASALARMS 5/10 PPM, 5/ �40% GOOD TEST -7-1/16" ANNULAR, BLIND/ SHEAR, 2-3/8" PIPE / SLIP, MUD X, 2-3/8"X 3-1/2" VARIABLE, 2-3/8" 'PIPE/SLIP -ALLTESTS 250 PSI LOW / 3500 PSI HIGH FOR 5 MIN EACH -TEST 1: IRV, PACKOFF, C9 BACKWARD, C10 BACKWARD PASS - - TEST 2: MASTER, BLIND / SHEAR, R1, BL1A, B1, B4 PASS -TEST 3: ANNULAR (2-3/8"), TIW#1, B3, B2, BL7 PASS -TEST4: UPPER 2-3/8" PIPE/ SLIP, TIW#2, BL2, R2, T2, C15 PASS - TEST 5: C76, T1, C11 CYCLE/GREASE C16 PASS -TEST B: VARIABLES (2-3/8"), C7, C9, C10, TV2 PASS -TESTT. LOWER 2-3/8" PIPE/ SLIP, C5, C6, C8, TVI PASS CONT'D ON 07-23-2019 7/23/2019 0000 - 01:30 1.50 BOPSUR P PRE -PERFORM ACCUMULATOR DRAW DOWN TEST - TEST 9: ANNULAR (3-1/2"), C1, C4 PASS - TEST 10: VARIABLE (3-1/2") C2, C_3_ PASS _ 01:30 - 05:30 4.00 KILLW P PRE RIG DOWN TEST EQUIPMENT - SWAP TO DRILLING RISERS -GREASE CHOKE MANIFOLD/STACK - INSTALL BHI FLOATS. PT OUTER BODY OF UQC -PRESSURE TEST MUD PUMP _ 05:30 - 06:30 1.00 KILLW P PRE DISPLACE COIL AND LOAD 19 BBLS OF NEAT METHANOL INTO COIL FOLLOWED BY 35 BBLS OF 8.4 BBLS OF KCL WITH SCAVENGER 06:30 - 07:00 0.50 KILLW P PRE PRESPUD MEETING WITH DRILL CREW TABLETOP EVAC DRILL 07:00 - 09:30 2.50 KILLW P PRE PULLTWC - HOLD PJSM WITH CREW AND REVIEW PROCEDURE - MOBILIZE LUBRICATOR AND EQUIPMENT TO RIG FLOOR. - MAKE UP PULLING TOOLAND MAKE LUBRICATOR UP TO WELL. _ 0930 - 1200 2.50 KILLW P PRE - INSTALL HARDLINE TO WELL(11-23) - FLUID PACK LINE - TEST TO 3500 PSI Printed 9/3/2019 4:50:1OPM "All depths reported in Drillers Depths" Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 3 of 19 Operation Summary Report '- REMOVE LUBRICATOR Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 7/21/2019 End Date: X3 -019G4 -C: (2,565,163.00 ) 15:30 - 16:30 Site: 11 KILLW Project: PBU Rig Name/No.: CDR -2 Spud Date/time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usfl (above Mean Sea Level) HOLD PJSM WITH CREW Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (us6). MAKE UP NOZZLE BHA WITH CHECKS 12:00 - 15:30 3.50 KILLW P PRE PULLTWC - HOLD PJSM WITH CREW AND REVIEW PROCEDURE WITH ONCOMING CREW - FLUID PACK STACK WITH METHANOL TO PT 16:30 - 18:00 1.50 I VC LUBRICATOR P PRE - WORK THROUGH COMMAND AND CONTROL VALVE CHECKLIST '- PRESSURE TEST LUBRICATOR TO 3500 PSI - GOOD PT - BLEED PRESSURE DOWN TO 2800 PSI - OPEN UP TO T WC - T WC PULLED, WELL PRESSURE - 2400 PSI - CLOSE MASTER VALVE, LTT 2400 PSI (WELL PRESSURE) CONFIRMED '- FLUSH TREE, BOP'S AND LUBRICATOR WITH 3 BBLS OF METHANOL TAKING RETURNS TO THE TIGER TANK -CLOSE SWAB VALVE - PERFORM LTT TO 3500 PSI - GOOD TEST -BLEED PRESSURE Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" • '- REMOVE LUBRICATOR LD TWC AND LUBRICATOR _ 15:30 - 16:30 1.00 KILLW P PRE WELL KILL "- HOLD PJSM WITH CREW MAKE UP NOZZLE BHA WITH CHECKS - MAKE UP INJECTOR AND TEST LUBRICATOR TO 3500 PSI -GOOD TEST 16:30 - 18:00 1.50 KILLW P PRE -HOLD PJSM WITH CREW FOR BLEEDING GAS FROM WELL - LINE UP TO BLEED GAS TO WELL 11-23 FLOWLINE OPEN MASTER AND SWAB VALVE- 2400 PSI ON WELL - BLEED GAS FROM WELL 11-11A TO WELL 11-23 - NOT ABLE TO FLOW HARD ENOUGH TO MAKE A DIFFERENCE —1800 - 2000 200 KILLW P PRE ATTEMPT BULLHEAD/KNOCK PRESSURE DOWN - STARTING PRESSURE = 2400 PSI -COME ONLINE WITH 20 BBLS METHANOLAT 1 BPM. PRESSURE STARTING TO FALL. - CHASE WITH 1% SLICK KCL W/ 0.6% BARALUBE WITH H2S SCAVENGER. - START INCREASING RATE AT 50 BELS AWAY TO 4.5 BPM. - ONCE FLUID TO PERFS. WELL STARTING TO PRESSURE UP. -COME OFFLINE. WELLBORE PRESSURE 0# 20:00 - 00:00 4.00 KILLW P 9,257.00 PRE RIH WITH NOZZLE BHA (INITIAL ENTRY) - 0.32 BPM RATE IN 10.37 BPM OUT. MAINTAIN 100-150 PSI ON CHOKE. - 8.34 PPG IN / 8.04 PPG OUT - LIGHTLY TAG WHIPSTOCK AT 9265' UNCORRECTED - PICKUP OFF WHIPSTOCK - BEGIN BOTTOM KILL - 3.1 BPM IN RATE / 2.94 BPM OUT RATE - 8.34 PPG IN 18.30 PPG OUT 1277# CIRC PRESSURE. - SWAP TO 8.6 PPG OD -N. - PURGE LUBRICATOR. Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" North America -ALASKA - BP Page 4 of 19 Operation Summary Report Common Well Name: 11-11 - 03:00 0.50 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3 -019G4 -C: (2,565,163.00 ) Project: PBU Site: 11 03:30 - 06:30 Rig Name/No.: CDR -2 Spud DateTme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. 06:30 - 14:00 BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) P - PRESSURE TEST QTS TO 3500 PSI HIGH Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) _. ' - RATE: 0.50 BPM IN, 0.95 BPM OUT, CIRC _ 7/24/2019 00:00 - 02:30 2.50 KILLW P 9,257.00 PRE PERFORM 10 MIN FLOW CHECK WELL 02:30 - 03:00 0.50 KILLW P 03:00 - 03:30 0.50 STWHIP P 03:30 - 06:30 . STWHIP P 3.00 06:30 - 14:00 7.50 STWHIP P 14:00 - 18:15 4.25 16:15 - 20.30 2.25 STWHIP P STWHIP P Printed 9/3/2019 4:50.10PM **All depths reported in Drillers Depths" STATIC -POOH -2.03 BPM RATE IN/ 1.54 BPM OUT 8.56 PPG IN /8.47 PPG OUT 9,257.00 PRE MONITOR WELL FOR 10 MINUTES AT BHA: STATIC . - INJECTOR OFF: 02:45 1 _ _ ____ _ LAY DOWN NOZZLE -BHA 9,257.00 WEXIT MAKE UP 3.720" MILLING BHA #2 - SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON: 03:35 _ _ 9,257.00 WEXIT RIH WITH 3.72° MILLING BHA #2 ' - RATE: 0.50 BPM IN, 0.95 BPM OUT, CIRC PRESSURE: 795 PSI - MUD WEIGHT: 8.59 PPG IN, 8.58 PPG OUT - TIE IN FROM 9121' TO 9220' (CORRECTION -CLOSE EDC -TAG WHIP STOCK (PINCH POINT) W/O PUMPS AT 9237' 9,247.20 WEXITMILL WINDOW FROM 9237 TO 9245' - RATE BPM IN 2.65 OUT - FREE SPIN 2669 PSI -PU 49 5O 25 - MUD WEIGHT 8.61 PPG IN, 8.50 PPG OUT ECD 9.71 -TAG @ 9238.7 AND START MILLING WINDOW -WOB 1-4 -08:30-RATE 2.59 BPM IN 2.61 BPM OUT, DUE TO PUMP #2 FAILURE (4 HRS) - 12:30 - RATE 2.80 BPM IN 2.82 BPM OUT HELD A D2 TABLE TOP DRILL WITH JEFF WARD (DRILLER) 9,257.35 WEXIT MILL RATHOLE FROM 9245' TO 9257' 2.84 BPM IN 12.86 BPM OUT MUD WEIGHT 8.59 PPG IN / 8.47 PPG OUT PUMP 5 BBLS LO / HI VIS SWEEPSAROUND. 9248' SAMPLE IS 60% FORMATION. PERFORM ONE UP, ONE DOWN, ONE UP PASS AT 1 FT/MIN.-OBSERVE 50 PSI MOTOR WORKAT TOP OF WINDOW TRANSITION DRY DRIFT -OBSERVE 1 K DRAG/OVERPULLAT TOP OF WINDOW TRANSITION PERFORM REAMING PASS FROM 9230'-9245' AND DRY DRIFT WITH SAME RESULTS PAINT YELLOW FLAG AT 9095.2 EDP / 9208.1' MILL DEPTH OPEN EDC PERFORM 10 MINUTE DYNAMIC FLOW _. CHECK 0.4 BBL LOSS 9,257.35 WEXIT POOH - 3.55 BPM IN / 3.05 BPM OUTAT 2627 PSI - FLOW CHECKAT 245' FOR TEN MINUTES -STATIC - FILL COIL WITH 15 BBLS OF FRESH WATER FOR CALIBRATING IN MICROMOTION Printed 9/3/2019 4:50.10PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 5 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date. X3 -019G4 -C: (2,565,163.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/Time: 6/2711985 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table Q58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ _ (hr) _ _ _ (usft) _ 20:30 - 2230 2.00 STWHIP P 9,257.35 WEXIT BHA HANDLE 2230 - 00:00 1.50 STWHIP P 7125/2019 00:00 - 02:00 2.00 STWHIP P 0200 - 0300 1.00 DRILL P 0300 - 05:40 2.67 DRILL P 0540 - 16.30 10.83 DRILL P Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" - HOLD PJSM WITH CREW -BREAK INJECTOR - INSPECT LAST 150' OF COIL -OBSERVE SCARING ON LAST 12 FEET OF COIL -LAY DOWN WINDOW MILLING BHA -CALIBRATE IN MICROMOTION '- MAKE UP NOZZLE, CLOSE SWAB AND _ CIRCULATE COIL BACK TO DRILLING FLUID 9,247.20 WEXIT CUT COIL - REMOVE UQC AND FLOAT - CUT 15' OF COIL -INSTALL CTC PULL TEST TO 50K 9,25735 PRODi CUT COIL - INSTALL UQC AND FLOATS - TEST CTC AND UQC TO 250/4500 PSI FOR 5 MINUTES EACH TEST FLOATS TO 3500 PSI 9,257.35 PRODt MAKE UP BUILD BHA - HOLD PJSM WITH CREW - MAKE UP BUILD BHA - INJECTOR ON AT 0250 HRS _ - TEST QTS TO 3500 PSI. _ 9,257.35 PROD1 RIH WITH BUILD BHA OPEN EDC - PUMP 0.50 BPM IN 11.04 BPM OUTAT 868 PSI -TIE IN DEPTH, CORRECT -20'. CLOSE EDC. 9,720.00 PROD1 RIH THROUGH WINDOW WITH NO ISSUES. TAG BOTTOM, PICKUP AND BRING PUMPS ON. START DRILLING BUILD FROM 9259' DRILL 4.125" BUILD FROM 9259' MD TO 9428' MD - FREE SPIN: 3000 PSI, 2.84 BPM - RATE: 2.83 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3000 - 3370 PSI - MUD WEIGHT: 8.53 PPG IN, 8.53 PPG OUT, ECD: 10.1 PPG WITH 200-250 PSI WHP - ROP: 50 -120 FT/HR, WOB: 1-3 KLBS AT 9410' PULL 150' WIPER, CLEAN PASS UP AND DOWN. AT 9428' PULL WIPER THROUGH WINDOW TO WORK OUT DIRECTIONAL PROBLEM, FIRST GOOD SURVEY IS BEHIND ON AZIMUTH. DISCUSS WITH ODE AND GEO, DECISION IS MADE TO CONTINUE DRILLING AND CATCH UP WITH ADDITIONAL BUILD FOOTAGE. AT 9565' PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. AT 9640 PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. DRILL TO TO OF BUILD AT 9720'. Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 6 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 7/21/2019 End Date. X3 -019G4 -C'. (2,565,163.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Dale From - To Hm Task Code NPT Total Depth Phase Description of Operations 16'30 - 19:30 3.00 DRILL P 9,720.00 PRODI PERFORM LONG WIPER TRIP TO WINDOW FROM 9720' MD - RATE: 2.84 BPM IN, 2.67 BPM OUT. CIRC PRESSURE: 2975 PSI - PERFORM 30 FT JOG BELOW WINDOW. -PULL THROUGH WINDOW AND OPEN EDC. - JET 7" CASING AT 4.27 BPM, ECD = 10.14 PPG ON OPEN CHOKE. - TIE IN LOG FROM 9195'-9229' CORRECTION +2' - CCL LOG FROM 8600'- 9000' P & C DEPTH. -START 9.8 PPG FLUID DOWN COIL - RBIH TO BOTTOM CLOSING EDC BEFORE PASSING THROUGH WINDOW. - WITH 9.8 PPG FLUID 10 BBLS OUT OF BIT POOH TO WINDOW MAINTAINING A 10.1 PPG ECDAT WINDOW •-OPEN EDC 1930 - 20:15 0.75 DRILL P 9,720.00 PROD1 POOH - PUMPING 9.8 PPG FLUID -DYNAMICFLOWCHECKFORIOMINUTES- 'LOSTI BBL GOOD. -PUMP 3.49 BPM IN/ 3.1 BPM OUTAT 2536 PSI MAINTAINING 10.1-10.4 PPG ECD '- AT7300'FEET NOTICEADROP ON IN —DENSITY, STOP TO INVESTIGATE _ 2015 - 21.30 1.25 DRILL N 9,720.00 PROD? RUN BACK IN HOLE TO WINDOWAND CIRCULATE WHILE MUD SYSTEM IS BROUGHT BACK UP TO WEIGHTAND 9.8 PPG FLUID IS AT BIT. NOTE: SEE IRIS REPORT 1386303 FOR MORE DETAILS _ 21'.30 - 23'30 200 DRILL P 9,720.00 PRODI POOH - PUMPING 9.8 PPG FLUID - PUMP 2.35 BPM IN / 2.0 BPM OUT AT 1748 PSI MAINTAINING 10.3 - 10.4 PPG ECD - AT 250' SLOWLY LOWER PUMP RATE PRIOR TO FLOW CHECK 2330 - 00:00 0.50 DRILL P 9,720.00 PROD1 BHA HANDLE - FLOW CHECK FOR TEN MINUTES - HOLD PJSM WITH CREW - BREAK INJECTOR AT 2335 HRS - INSPECT LAST 150' OF COIL -GOOD - LAY DOWN BUILD BHA_ _ 7/26/2019 0000 - 0030 0.50 DRILL P 9,720.00 PRODI BHA HANDLE _ - LAY DOWN BUILD BHA 00:30 - 01:00 0.50 DRILL P 9,720.00 PRODI FUNCTION TEST BOPS FUNCTION TESTANNULAR, UPPER AND LOWER PIPE SLIP RAMS, BLINDS AND HCRS FROM DRILLERS STATION -GOOD_ 01:00 - 02:00 1.00 DRILL P 9,720.00 PROD? BHA HANDLE - HOLD PJSM WITH CREW - MAKE UP LATERAL BHA - MAKE UP INJECTOR AT 0155 HRS - TEST QTS TO 3500 PSI -GOOD Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths** 05:00 - 06:00 1.00 DRILL P 06:00 - 13:30 7.50 DRILL P 13:30 - 1415 0.75 DRILL P 14:15 - 1600 1.75 DRILL P North America - ALASKA - BP Page 7 or 19 START TO FUNCTION AT 1.5 BPM, 487 PSI Operation Summary Report DIFFERENTIAL, LATERAL VIBRATION OF 1, AT Common Well Name: 11-11 2.8 BPM, 1200 PSI DIFFERENTIAL, LATERAL AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date. X3 -019G4 -C: (2,565,163.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. - TIE IN FROM 9195' TO 9224 CORRECTION BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) (usft) __ 02:00 - 05:00 300 DRILL P 9,720.00 PROW RUN IN HOLE WITH LATERAL BHA 05:00 - 06:00 1.00 DRILL P 06:00 - 13:30 7.50 DRILL P 13:30 - 1415 0.75 DRILL P 14:15 - 1600 1.75 DRILL P Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" - RIH TO 300' AND TEST BHA. AGITATOR START TO FUNCTION AT 1.5 BPM, 487 PSI DIFFERENTIAL, LATERAL VIBRATION OF 1, AT 2.8 BPM, 1200 PSI DIFFERENTIAL, LATERAL VIBRATION OF 1 TO 2. MUD WEIGHT IS 9.8 PPG. FV=46 - OPEN EDC - PUMP 0.5 BPM IN 10.86 BPM OUT AT 664 PSI - GRADUALLY BRING ECDS UP TO 10.1 PPG - TIE IN FROM 9195' TO 9224 CORRECTION -24 -OPEN EDC AND RIH 9,720.00 PROD1 DISPLACE 9.8# MUD OUT, EASE PUMP RATE UP SLOWLY TO KEEP ECD - 10.4 PPG. _ 9,720.00 PROD? DRILL 4.125" LATERAL FROM 9722' MD TO .9980' MD - FREE SPIN: 3050 PSI, 2.50 BPM - ONCE ALL 9.8# MUD OUT GO TO 2.8 BPM - RATE: 2.50 BPM IN, 2.51 BPM OUT. CIRC PRESSURE: 3050 - 3200 PSI - MUD WEIGHT: 8.71 PPG IN, 9.78 PPG OUT, . ECD: 10.1 PPG WITH 40 PSI WHP - ROP: 80 - 120 FT/HR, WOB: 1 KLBS - AT 9830'PUMP S BBLS LO/HI VIS SWEEPS AROUND. AT 9850' PULL 150' WIPER, CLEAN PASS UP _ _ _ AND DOWN. 9,980.00 PROD1 TWO BROKEN BOLTS ARE FOUND THAT HOLD THE SHAKER MOTORS ON. PULL WIPER TRIP TO WINDOW WHILE BOLTS ARE REPLACED. WHILE PULLING PAST 9530' ANNULAR PRESSURE INCREASES TO 11.4 PPG WITH 3K OVERPULL, RUN BACK IN. PULL BACK THROUGH, PACKING OFF AGAIN AT 9510'. STOP TO RUN BACK IN THEN CLEANS UP. CONTINUE WIPER TRIP TO WINDOW. 14:10 -SHAKER BOLTS REPLACED, SHAKER BACK ON. CONTINUE WIPER TRIP TO WINDOW. AT 9323' OVERPULL 9K THEN POP FREE, NO ANNULAR PRESSURE INCREASE. PERFORM JOG BELOW WINDOW. PULLTHROUGH WINDOWAT 13 FT/MIN, 180L, 0.5 BPM WITH NO ISSUES. ABOVE WINDOW OPEN EDC. BLEED IA FROM 15_00 TO 500 PSI AT 14:20. 9,980.00 PRODI OPEN EDC, PUMP 10 BBLS LO / HI VIS SWEEPSAROUND. PUMP 4.05 BPM / 3340 PSI WHILE PICK UP SLOWLY. PUMP 2X B/U UNTIL RETURNS CLEAN UP. RIH TO WINDOW AND CLOSE EDC, TRAP 10.5 PPG PRESSURE. Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 19, Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date X3-019134-C'. (2,565.163 00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/Time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:00 - 17:00 1.00 DRILL P 9,980.00 PROD1 PASS THROUGH WINDOW AT 18OL, 15 FT/MIN, 0 PUMP NOTHING SEEN. LOG RA TIE-IN, CORRECT+1.5'. RIH AT 0.5 BPM, STACK WEIGHT AT 9503'. PICK UP AND POP THROUGH. MINOR SETDOWNSA FEW MORE TIMES. AT 9700' PICK BACK UP TO 9450', GO TO 2.8 BPM. NOTHING SEEN. CONTINUE RIH TO BOTTOM, KEEP 1 BPM WHILE RUNNING IN. _ 1700 - 2330 6.50 DRILL P 10,440.00 PROW DRILL 4.125" LATERAL FROM 9980' MD TO 10440' MD - FREE SPIN: 3500 PSI, 2.82 BPM - RATE: 2.82 BPM IN, 2.82 BPM OUT. CIRC PRESSURE: 3500 - 3700 PSI - MUD WEIGHT: 8.72 PPG IN, 8.67 PPG OUT, ECD: 10.16 PPG AT WINDOW WITH 140 PSI WHIP - ROP: 20 - 30 FT/HR, WOB: 2 - 3 KLBS -AT 10130' PERFORM 100' WIPER TRIP. -AT 10280'PERFORM 150'WIPER TRIP - PUMP 5X5 BBL LO/HI VIS SWEEP. -AT 10440' PERFORM WIPER TRIP AFTER PUMPING 10X10 BBL LO/HI VIS SWEEP. NOTE: CONTINUOUS OSCILLATING DRILLING STARTED AT 10202' MD 2330 - 0000 0.50 DRILL P 10,440.00 PROD? WIPER TRIP TO 7" - POOH PUMPING AT 2.84 BPM IN / 2.65 BPM OUT AT 3335 PSI - PUMP 5X5 BBL LO/HI VIS SWEEP. - JOG FROM 9350'-9450' Printed 9/3/2019 4:50 IOPM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 9 of 19 Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3�019G4-C: (2,565,163.00) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations . (hr) _ _ (usft) 7/27/2019 00:00 - 04:30 4.50 DRILL P 10,440.00 PROD? WIPER TRIPTO 7" - POOH PUMPING AT 2.84 BPM IN / 2.65 BPM OUT AT 3335 PSI - JOG FROM 9350'-9450' - PUMP 1OX10 BBL LO/HI VIS SWEEP - PULL THROUGH WINDOW AT 13 FT/MIN, 180L, 0.5 BPM WITH NO ISSUES. -CLEAN TRIP -ABOVE WINDOW OPEN EDC - PUMP 4 BPM AT 3560 PSI -JET TRAY -JET 7" WHILE PUMPING SWEEP OUT OF HOLE -TIE IN FROM 9200' TO 9222 CORRECTION +1' -CLOSE EDC RUN THROUGH WINDOW -PUMP 0.5 BPM IN 10.6 BPM OUT -AT 9487' SET DOWN 10K, ATTEMPT TO WORK THROUGH SEVERAL TIMES, START PICKING UP HEAVY, INCREASE PUMP RATE AND PICK BACK UP AND WORK FROM 9350'-9450 AT 2.8 BPM - DECREASE PUMP RATE TO 1 BPM AND RIH FROM 9450' TO 9509', PICK UP CLEAN AND RUN INTO 9750' '- INCREASE PUMP RATE TO 2.8 BPM AND PULL BACK UP TO 9350' - DECREASE PUMP RATE TO 1 BPM AND RIH SET DOWN 3K AT 9791', 98841, 9908', 99133' INCREASE RATE TO 2.8 BPM AT 10200 ONCE PAST SHALES AT 10025'CONTINUE TO RIH. -START SEEING DECREASE IN STRING WITH NO CORRESPONDING BIT WEIGHT AND AN INCREASE IN ECDS AND MWD ANNULAR PRESSURES INDICATING PACK OFF CONDITIONS. -DISCUSS WITH SUPERINTENDENT, ODE AND ETLAND DECIDE TO WORK PIPE UNTIL CONDITIONS IMPROVE AND PERFORM A _ WIPER TRIP TO 4000' _ 04:30 - 05'.00 0.50 DRILL N 10,440.00 PROD? WIPER TRIP TO 4000" - POOH PUMPING AT 2.80 BPM IN 12.65 BPM OUT AT 3335 PSI -SEE REDUCED RETURNS AT 9954, 9820', JOG IN HOLE 10'AND COMEBACK THROUGH - AT 9764' EXPERIENCE OVER PULL OF 17K AND LOSS OF RETURNS, WORK BACK DOWN REESTABLISH RETURNS. - RBIH TO 10066' ABLE TO REESTABLISH RETURNS WITH BHA IN SAND. Printed 9/3/2019 4'.50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 10 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3 -019G4 -C'. (2.565.163o0) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Daterrime: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor NABORSALASKA DRILLING INC. Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) 05:00 - 07:30 2.50 DRILL N 07:30 - 10:00 2.50 DRILL N 1000 - 12'.30 2.50 DRILL N 12:30 - 1430 200 DRILL N Total Depth Phase Description of Operations (usft) 10,440.00 PROD1 CONTINUE WORKING PIPE BOTH DIRECTIONSAT VARIOUS PUMP RATES TO MAINTAIN RETURNS AND PIPE MOVEMENT ABLE TO POOH AT SLOW SPEED AND REDUCED RATE HAVE TO WORK PIPE AND VARY RATES TO KEEP MOVING. AT 9580' PACKING OFF, RUN BACK IN AND POP FREE. INCREASE RATE TO 2 BPM AND PICK UP SLOW, STILL PACKING OFF. REDUCE RATE AND DRAG THROUGH THIS AREA. CONTINUED OVERPULLS ABOVE 9500'. . PULL THROUGH WINDOW, UP TO TUBING TAIL, 100' JOG IN TUBING TAIL. 10,440.00 PROD? OPEN EDC AT 8800'. PUMP 7 BBLS 9.8# SWEEP, POOH. SWEEP DOESN'T BRING BACK ANY SHALES, MODERATE INCREASE IN SAND RETURNS. . CONTINUE WIPER TRIP TO 4000'. SAND RETURNS GETTING LESS. 10,440.00 PROD? TURN AROUND AT 4000'AND RIH. PUMP 4.2/4.7 BPM. LOG TIE-IN FROM 9200'. CORRECT -10'. PUMP 10 BELS 9.8# SWEEP. TRY TO PASS WINDOW, STACKING AT 9244' (CLOSE TO BOTTOM OF WINDOW] TRY 20 DEG LEFTAND RIGHT OF LOWSIDE, NO GO. TRY LOWERING RATE TO 3.2 BPM, PASS WINDOW, RIH TO JET WHIPSTOCK TRAY. JET TRAY AT 4.16 BPM 13670 PSI. BOTTOMS UP FROM WEIGHTED SWEEP BRINGS BACKA LITTLE SAND, NO SHALE. RUN BACK TO WINDOW AND CLOSE EDC. 10,440.00 PROD1 TRY TO PASS WINDOW4 TIMES AT O PUMP, LOWSIDE TF, VARIOUS SPEEDS, NO GO. PICK UP AND ROLL PUMP THEN SHUT DOWN. RIH THROUGH WINDOWAT 180L, 10 FT/MIN, 0 PUMP NO ISSUES. PUMP 0.56 BPM WHILE RIH. AT 9400' PICK BACK TO 9350' AT 2.8 BPM, CLEAN PASS. 50' JOG AT 9500', CLEAN PASS. 50' JOG AT 9650', CLEAN PASS. 60' JOG AT 9760', CLEAN PASS. 50' JOG AT 98501, CLEAN PASS. STACK WEIGHT AT 991 0'WHILE CHANGING TF. PICK UP AND RUN PAST TO END OF SHALE ZONE. 50' JOG AT 10100', CLEAN PASS. 50' JOG AT 10250', CLEAN PASS. 50' JOG AT 10430', CLEAN PASS. Printed 9/3/2019 4:50:1OPM "All depths reported in Drillers Depths" North America - ALASKA - SP Page 11 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/21/2019 End Date: X3 -019G4-0(2,565,163.00) Protect: PSU Site: 11 -- Rig Name/No.: CDR -2 Spud DateTme: 6/27/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 14:30 - 15:30 1.00 DRILL P 10,454.00 PROD1 DRILL 4.125" LATERAL FROM 10440'MD TO 10454' MD - FREE SPIN: 3380 PSI, 2.79 BPM - RATE: 2.76 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3350-3600 PSI - MUD WEIGHT: 8.77 PPG IN, 8.71 PPG OUT, ECD: 10.29 PPG WITH 160 PSI WHIP - ROP: 60 - 120 FT/HR, WOB: 1 - 2 KLBS AT 10454 ANNULAR PRESSURE COMES UP BY 150 PSI, PICK UP FOR WIPER TRIP. CONTINUE PUMPING 2.8 BPM WHILE PULLING UP. ANNULAR PRESSURE FLUCTUATING 400 PSI DURING WIPER TRIP. RECIPROCATE PIPE BELOW MASSIVE SHALE UNTIL NEW MUD IS READY. 1530 - 1830 3.00 DRILL N 10,45400 PROD1 START NEW MUD DOWN CT. PULL VIPER TO WINDOW. KEEP 10.2 PPG ECD WHILE ON WIPER TRIP. 3K OVERPULL AT 9950'. RUN BACK DOWN AND PULL THROUGH CLEAN. AFTER PULLING THROUGH SHALE INCREASE RATE TO 2.7 BPM. 'CONTINUE WIPER TRIP TO WINDOW. PRESSURE UP AND OVERPULLAT 9734', RUN BACK IN AND PULL THROUGH AT 1.5 BPM. CLEAN PASS THROUGH UPPER SHALE AT 1 BPM, 25 FT/MIN. AT 9450 SLOW TO 10 FT/MIN, SLOWLY BRING RATE UP TO 2.7 BPM. OVERPULLAT 9322'AT 2 BPM, RUN BACK IN AND PULLTHROUGH AT 1 BPM. PULLTHROUGH WINDOWAT 0.5 BPM JOG 100' AT 2.7 BPM ORIENTED TO HIGH SIDE. SHUT DOWN PUMPSAND OPEN EDC BRING PUMPS TO 4 BPM AND JET TRAY -HAD TO REDUCE RATE AND ORIENT 150L TO PASS THROUGH BOTTOM OF WINDOW AT 9246' HAD TO ORIENT 135R ON THE WAY UP PAST IT. JOG TO 8700' WITH 10X10 BBL LO/HI VIS SWEEP COMING OUT. NO INCREASE IN CUTTING WITH SWEEP BACK TO SURFACE. TIE IN 9200'-8224' CORRECTION +1' 18:30 - 18:30 1.00 DRILL N 10,454.00 PROD1 WIPER TRIP TO BOTTOM - CLOSE EDC AND ORIENT 150L - PUMP 0.5 BPM IN 0.7 OUT AT 1635 PSI - CLEAN TRIP 19:30 - 00:00 4.50 DRILL P 10,729.00 PROD1 DRILL 4.125" LATERAL FROM 10454'MD TO 10729' MD - FREE SPIN: 3310 PSI, 2.8 BPM - RATE: 2.8 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3350 - 3600 PSI - MUD WEIGHT: 8.77 PPG IN, 8.81 PPG OUT, ECD: 10.29 PPG WITH 187 PSI WHP -150' WIPER TRIP AT 10600' WITH 5X5 BBL LO/HI VIS SWEEP. - ROP: 80 - 100 FT/HR, WOB. 1 - 2 KLBS Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 12 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type. RE-ENTER- ONSHORE(RON) Start Date: 7/21/2019 End Date: X3 -019G4 -C:(2,565,163.00) Project PBU Site: 11 Rig NametNo.: CDR -2 Spud DateTme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58-00usft (above Mean Sea Level) Date From - To Him Task Cade NPT Total Depth Phase Description of Operations (hr)_ _ (usft) _ 7/28/2019 00:00 - 04:00 4.00 DRILL P 10,960.00 PROD1 DRILL 4.125" LATERAL FROM 10729' MD TO 04:00 - 06'.30 2.50 DRILL P 10,960.00 06'.30 - 0800 1.50 09:00 - 12:00 4.00 DRILL P 10,960.00 DRILL P 11,33000 10960' MD - FREE SPIN: 3270 PSI, 2.8 BPM - RATE: 2.8 BPM IN, 2.73 BPM OUT. CIRC i PRESSURE: 3350-3600 PSI - MUD WEIGHT: 8.77 PPG IN, 8.81 PPG OUT, ECD: 10.29 PPG WITH 187 PSI WHP 150' WIPER TRIP AT 10760' WITH 5X5 BBL LO/HI VIS SWEEP. -10X10 BBL LO/HI VIS SWEEP AT 10800' - BHA WIPER AT 10858' PUMP 5X5 BBL LO/HI VIS SWEEPAT 10940' - ROP: 80 - 100 FT/HR, WOB: 1.5 - 2.5 KLBS PROD1 WIPERTOWINDOW. - KEEP 102 PPG ECD WHILE ON WIPER TRIP. .- PUMP 1 BPM THROUGH THE SHALES AND 2.8 BPM THROUGH THE SANDS - PULL THROUGH WINDOW AT 135L, 0.5 BPM, 15 FT/MIN WITH NO ISSUES. - PUMP 10 BBLS LO / HI VIS SWEEPS -100' JOG ABOVE THE WINDOW THEN OPEN EDC. - CLEAN 7" CASING UP TO TUBING TAILAT 4.2 BPM / 3600 PSI. -SWEEP BRINGS BACK SLIGHTLY MORE SAND, NOTHING ELSE. PROD1 TIE-IN DEPTH FROM 9180'. CORRECT *2.5'. TRAP PRESSURE AND CLOSE EDC. PASS THROUGH WINDOW AT 150L, 25 FT/MIN, 0 PUMP WITH NO ISSUES. PUMP 0.5 BPM WHILE RIH TO BOTTOM. SLIGHT WEIGHT BOBBLES THROUGH THE 9800-10000 SHALE. PROD1 DRILL 4.125" LATERAL FROM 10960' MD TO 11330' MD - FREE SPIN: 3320 PSI, 2.79 BPM - RATE: 2.78 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3350-3600 PSI - MUD WEIGHT: 8.62 PPG IN, 8.56 PPG OUT, ECD: 10.18 PPG AT WINDOW WITH 140 PSI WHP -AT 11 060'PUMP 5 BBLS LO / Al VIS SWEEPS -PULL 150'WIPER TRIP AT 11110'. CLEAN PASS UP AND DOWN. -AT 11220' PUMP 5 BELS LO / Al VIS SWEEPS -AT 11260' PULL 150' WIPER. CLEAN PASS UP Printed 9/312019 4:So:1OPM '*All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: 11-11 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 712112019 End Date: Project: PBU Site: 11 AFE No X3 -019G4 -C'. (2,565.163,00 ) Page 13 of 19 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table §58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) _ 1200 - 1330 1.50 DRILL N 11,330.00 PROD1 DRILLTO11330'. DIFFERENTIAL DRILLS OFF, TRY TO PICK UP AND CAN'T. DIFFERENTIALLY STUCK CYCLE PIPE 2 TIMES i5K TO 80K, NO MOVEMENT. SHUT DOWN PUMP 5 MIN, CYCLE PIPE 2 TIMES 1 OK TO 80K, THEN 90K, NO MOVEMENT. MIX SPACERS FOR PUMPING LVT. CONDUCT PJSM FOR PUMPING LVT. PUMP 10 BBLS 3% KCl, 20 BBLS LVT, 10 BELS 3% KCL. PUMP 10 BBLS OUTAND SHUT DOWN TO SOAK, TRAP 10.2 PPG. _ PULL ONCE TO 85K, PIPE IS FREE. 1330 - 1815 4.75 DRILL P 11,330.00 PROD? WIPER TO WINDOW, CIRCULATE OIL OUT OF WELL. REDUCE RATE AND KEEP AS DRILLED TF THROUGH SHALES. MAINTAIN 10.2 PPG ECD DURING TRIP. CLEAN PASS UP, MINOR WEIGHT BOBBLES THROUGH 9800 - 10000 SHALE. PULL THROUGH WINDOW AT 150L, 20 FT/MIN, 0.5 BPM, NOTHING SEEN. PERFORM 100 FT JOG ABOVE WHIPSTOCK. OPEN EDC AND JET 7" CASING UP TO TUBING TAIL. PUMP 10 BELS LO / HI VIS SWEEPS, SWEEPS BRING BACK SLIGHT INCREASE IN SANDS, NOTHING ELSE. LOG TIE-IN FROM 9180', CORRECT -6 FT. CLOSE EDC, PASS THROUGH WINDO W AT 150L, 15 FT/MIN, 0 PUMP WITH NO ISSUES. PUMP 0.5 BPM TO BOTTOM. 1815 - 0000 5.75 DRILL P 11,604.00 PROD? DRILL 4.125" LATERAL FROM 11 330'MD TO 11604' MD - FREE SPIN: 3380 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.79 BPM OUT. CIRC PRESSURE: 3350-3600 PSI - MUD WEIGHT: 8.64 PPG IN, 8.58 PPG OUT, ECD: 1024 PPG AT WINDOW WITH 117 PSI WHIP -AT 11410' PUMP 5 BBLS LO / HI VIS SWEEPS -PULL 150'WIPER TRIP AT 11110'. CLEAN PASS UP AND DOWN. -AT 11440' PERFORM BHA WIPER AND ON WAY BACK DOWN NOTICED STRING DRAG AND INCREASE IN ECDS -AT 11440' PERFORM 300' WIPER. TRIP -CLEAN PASS UP AND DOWN - AT 11525' PUMP 5 BBLS LO / HI VIS SWEEPS NOTE: SEEING WEIGHT TRANSFER ISSUES START INCREASING LUBES 0.5 PERCENT Printed 9/3/2019 4:50:1OPM "'All depths reported in Drillers Depths" North America - ALASKA - BP Page 14 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date. 7/21/2019 End Date: X3 -019G4 -C:(2,565,163.00) Project: PBU Site: 11 -- - - - -- -- Rig Name/No.: CDR -2 Spud Date/Time: 6/27/1985 12:00 OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table §58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _(hr) (usft) 7/29/2019 00:00 - 02:30 2.50 DRILL P 11,805.71 PROD1 DRILL 4.125" LATERAL FROM 11604'MD TO Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" 11805' MD - FREE SPIN: 3375 PSI, 2.81 BPM - RATE: 2.81 BPM IN, 2.79 BPM OUT. CIRC • PRESSURE: 3350 - 3600 PSI - MUD WEIGHT: 8.64 PPG IN, 8.58 PPG OUT, ECD: 10.24 PPG AT WINDOW WITH 117 PSI WHIP - PULL 300' WIPER TRIP AT 11651' AFTER 30K OVERPULL COMING OFF BOTTOM. CLEAN PASS UP AND DOWN. •- PUMP 5X5 BBL LO/HI VIS SWEEPAT 11651' - DRILLING AHEAD WITH LOTS OF PICK UPS DUE TO WEIGHT TRANSFER ISSUES. NOTE ADDING LUBES TO BRING UP LUBE CONCENTRATION 0.5 %-STOPADDING LUBES • AND ORDER NEW MUD AT 11700' 0230 - 0530 3.00 DRILL P 11,805.71 PROD1 WIPER TO WINDOW. - KEEP 10.2 PPG ECD WHILE ON WIPER TRIP. -PUMP I BPM THROUGH THE SHALES AND 2.8 BPM THROUGH THE SANDS - PULLTHROUGH WINDOWAT 150R, 0.5 BPM, 15 FT/MIN WITH 2K BOBBLE. - PUMP 10 BBLS LO / HI VIS SWEEPS - 100'JOG ABOVE THE WINDOWTHEN OPEN EDC. -CLEAN 7" CASING UP TO TUBING TAILAT 4.2 BPM 13800 PSI. -SWEEP BRINGS BACK 15% INCREASE IN SAND CUTTINGS -TIE IN FROM 9180', CORRECT -4'. 05:30 - 0730 2.00 DRILL P 11,80571 PROW CLOSE EDC AT WINDOW. PASSTHROUGH WINDOW AT 160L, 22 FT/MIN, 0 PUMP WITH NO ISSUES. RIH AT 0.5 BPM. AT 10575' BRIEF ANNULAR PRESSURE SPIKE TO 11 PPG. 07:30 - 18:00 10.50 DRILL P 12,270.00 PRODI DRILL 4.125" LATERAL FROM 11805' MD TO 12270' MD - FREE SPIN: 3300 PSI, 2.76 BPM - RATE: 2.78 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 3300-3600 PSI - MUD WEIGHT: 8.52 PPG IN, 8.66 PPG OUT, ECD: 10.24 PPG AT WINDOW WITH 81 PSI WHP - STILL PUMPING OLD MUD UP TO SURFACE. - ROP 100 - 150 FT/HR. - FREQUENT PICKUPS WHENEVER DIFFERENTIAL OR DWOB DRILLS OFF. - PUMP 5 BBLS LO / HI VIS SWEEPS AT 11900'. -PULL 200' WIPER AT 11955'. CLEAN PASS UP AND DOWN. - BLEED ODA FROM 250 TO 100 PSI. -AT 12065' PUMP 10 BBLS LO / HI VIS SWEEPS. - AT 12105' PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. - AT 12200' PUMP 5 BBLS LO / Al VIS SWEEPS. Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" North America -ALASKA - Blo Operation Summary Report Common Well Name: 11-11 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/21/2019 End Date: Protect: PBU --- Site:11-- - -- -- -- Rig Name/No.: CDR -2 Spud DateMnne: 6/27/1985 12:00:OOAM Rig Contractor: NABORSALASKA DRILLING INC. Active datum: Kelly Bushing / Rotary Table (ID58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase (hr) _ _ (us8) 1800 - 0000 6.00 DRILL P 12,270.00 PRODI 7/30/2019 00:00 - 01.00 1.00 j DRILL P 12,270.00 PROD1 01:00 - 05:30 4.50 DRILL P 12,596.00 PRODI Printed 9/3/2019 4:50AOPM **All depths reported in Drillers Depths" Page 15 of 19 AFE No K3 -019G4 -C: (2, 565,163.00 ) Release: Description of Operations WIPER TO 4000' - KEEP 10.2 PPG ECD WHILE ON WIPER TRIP. - PUMP 1 BPM THROUGH THE SHALESAND 2.8 BPM THROUGH THE SANDS PULL THROUGH WINDOWAT 150R, 0.5 BPM, 15 FT/MIN WITH 2K BOBBLE. - PUMP 10 BBLS LO / HI VIS SWEEPS 100' JOG ABOVE THE WINDOW X 2, THEN OPEN EDC. -EXPERIENCE MINOR PACK OFF JUSTABOVE WINDOW - ORIENT 150L JET TRAY -SET DOWN SK AT BOTTOM OF WINDOW, PICK UP ABOVE WINDOW CLOSE EDC AND ROLL BIT, OPEN EDC - CLEAN T' CASING UP TO TUBING TAILAT 4.1 BPM 13620 PSI. -SWEEP BRINGS BACK 15% INCREASE IN SAND CUTTINGS - CONTINUE TO PULL TO 4000' CHASING A 5X5 BBL LO HI VIS SWEEP. -SLIGHT INCREASE IN CUTTINGS WITH SWEEP OUT. - RUN BACK IN HOLE. TIE IN FROM 9180-9225.19 CORRECTION -13 - ORIENT 150L AND JET WHIPSTOCK TRAY WITH NO ISSUES - RUN IN HOLE PUMPING 0.45 BPM IN 10.7 BPM OUT AT 1757 PSI NOTE: BLEED DOWN ODA FROM 250 PSI TO 100 PSI WIPER TO 4000' - RUN IN HOLE PUMPING 0.45 BPM IN / 0.7 BPM OUT AT 1757 PSI _ DRILL 4.125" LATERAL FROM 12270' MD TO 12596' MD - FREE SPIN: 3500 PSI, 2.78 BPM - RATE: 2.78 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 3300-3600 PSI - MUD WEIGHT: 8.61 PPG IN, 8.56 PPG OUT, ECD: 10.26 PPG AT WINDOW WITH 100 PSI WHP - PULL 250' WIPER AT 12420'. CLEAN PASS UP AND DOWN. - FREQUENT PICKUPS WHENEVER DIFFERENTIAL OR DWOB DRILLS OFF. - PUMP 5 BBLS LO / HI VIS SWEEPS AT 12420'. - PULL 200' WIPER AT 12570'. CLEAN PASS UP AND DOWN.. - AT 12570' PUMP 5 BELS LO / HI VIS SWEEPS. North America - ALASKA- BP Operation Summary Report Common Well Name: 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3 -019G4 -C: (2,565,16100) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/time: 6/27/1985 12:00:OOAM Rig Release: Page 16 of 19 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) BPUOI: USA00001224 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 05:30 12:20 8.83 DRILL P 12,701.00 PROD? DRILL 4.125" LATERAL FROM 12586' MD TO 12701' MD - FREE SPIN: 3600 PSI, 2.82 BPM - RATE: 2.82 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3600-3800 PSI - MUD WEIGHT: 8.66 PPG IN, 8.58 PPG OUT, ECD: 10.11 PPG AT WINDOW WITH 100 PSI WHP - FREQUENT PICKUPS WHENEVER DIFFERENTIAL OR DWOB DRILLS OFF. - AT 12605' PUMP 5 BELS LO / HI VIS SWEEPS. STACKING WEIGHT, DIFFICULT SLIDING. - AT 12665'START NEW MUD DOWN THE CT. - AT 12700' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. 12:20 - 17:45 5.42 DRILL P 12,701.00 PROD1 WIPER TRIP FROM 12701' TO WINDOW - KEEP 10.2 PPG ECD AT WINDOW WHILE ON WIPER TRIP. - PUMP 1 BPM UP THROUGH THE SHALES AND 2.8 BPM THROUGH THE SANDS. PULL THROUGH WINDOWAT 150R, 0.5 BPM, 20 FT/MIN NOTHING SEEN. 100 FT JOG ABOVE THE WINDOW THEN OPEN THE EDC. PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. - PULL UP TO 8750' WHILE PUMPING 4.2 BPM. - WHILE DOING WIPER STOP IN 7" AND CHANGE OUT 2 ELASTOMER PADS. - THE 7" B/U AT HIGH RATE BRINGS BACK ABOUT 30% EXCESS SAND. SWEEPS DONT BRING BACK MUCH EXCESS. - TIE-IN DEPTH, CORRECT + 0.5 FT. - PASS THROUGH WINDOW AT 150L, 17 FT/MIN, 0 PUMP WITH NO ISSUES - RUN TO BOTTOM AT 0.5 BPM, AS DRILLED TF. 17:45 - 00:00 6.25 DRILL P 12,881.00 PROD1 DRILL 4.125" LATERAL FROM 12701' MD TO 12881' MD (UNCORRECTED) , -FFEE bVIN: 3770 PSI, 2.77 BPM - RATE: 2.77 BPM IN, 2.79 BPM OUT. CIRC PRESSURE: 3600-3800 PSI - MUD WEIGHT: 8.55 PPG IN, 8.48 PPG OUT, ECD: 10.15 PPG AT WINDOW WITH 124 PSI WHIP - FREQUENT PICKUPS WHENEVER DIFFERENTIAL OR DWOB DRILLS OFF. - AT 12770' PUMP 5 BBLS LO / HI VIS SWEEPS. STACKING WEIGHT, DIFFICULT SLIDING. -AT 12820' PUMP 5 BBLS LO / HI VIS SWEEPS. STACKING WEIGHT, DIFFICULT SLIDING CALLTDAT12881'. WELLOBJECTIVES HAVE BEEN MET. Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 17 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date: X3-019G4-C: (2,565,163 00) Project:-PBU Site: 11 Rig Name/No.: CDR-2 Spud Datefrime: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/31/2019 0000 - 0500 5.00 DRILL P 12,881.00 PROD1 CONDITION WELLBORE - PUMP 10X 10 SWEEP - POH FIRST OF TWO WIPER TRIPS - RATE BPM 2.78 IN 2.61 OUT - FREE SPIN 3365 PSI - 12600' SLIGHT PRESSURE INC WITH A MAX ECD OF 10.4 - RETURNS AT SHAKER 85% SHALE 15% SAND - 1188VOVERPULL 12K ECD 10.6 - 9945'OVERPULL 20K WOB-9 ECD 10.6 - 9835 OVERPULL 10K WOB-11 -9753OVERPULL20KWOB-11 ECD11.48 ATTEMPTING TO PACK OFF - DISCUSSED WITH ODE TO LOWER PUMP RATE TO 1 BPM - RIH TO 10215' - POH FROM 10215' TO 10074' WITHRATE 2.74 IN 2.61 OUT - 10074' REDUCE PUMP RATE TO 1 BPM IN .71 OUT 1976 PSI - POH FROM 10074' TO 9760'@ 1 BPM IN .71 'OUT - POH FROM 9760' TO 9631'@ 2.78 BPM IN 2.62 OUT - POH FROM 9631' TO 9449' @ 1 BPM IN .71 OUT - POH FROM 9449' TO 9350' @ 2.78 BPM IN !i 2.70 OUT (PUMP 10X10) - POH FROM 9350' TO 9277' @ 1.09 IN .95 OUT - PULL THROUGH THE WINDOW WITH .50 IN .40 OUT (TF 150R) -PULL 7O 9062'@2.76 BPM IN 2.69 OUT -JOG IN TO 9198' -OPEN EDC - CIRCULATE BPM 4.23 IN 4.21 OUT 3805 PSI (HOLE UNLOADED 100% SHALE) - LOG TIE IN (CORRECTED +2') -CLOSE EDC 0590 - 07 00 2.00 DRILL P 12,881.00 PROD1 CLOSE EDC. RIH, PASS WINDOW AT 150L, 15 FT/MIN, 0 PUMP NO ISSUES. RIH AT 0.5 BPM THROUGH THE SHALES. STACK WEIGHTAT 9531', PICK UP AND POP THROUGH. STACK WEIGHTAT 12571', PICK UP AND RUN THROUGH, STACK AT 12581'. RIH TO 12700' AND PICK BACK UP SLOWLY. SHORT PICKUP HEREAT 2.8 BPM THEN REDUCE RATE AND RIH TO BOTTOM. Printed 9/3/2019 4:50:10PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: 11-11 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/21/2019 Project PBU Site: 11 Rig Name/No.: CDR -2 Spud DaterhmW 6/27 AFE No End Date: X3 -019G4 -C.(2,565,163.00) Page 18 of 19 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From -To Hm Task Code NPT Total Depth Phase Description of Operations (hr) —_(usft). _ _ __ 07:00 - 10:30 3.50 DRILL P 12,881.00 PROD1 TAG AT 12881', OFFICIAL DRILLED TD DEPTH. WIPER TRIP TO SWAB. HOLD 10.2 PPG ECD WHILE PULLING TO SWAB, PUMP 1 BPM THROUGH THE SHALES, 2.8 BPM THROUGH THE SAND. SLOW DOWN POOH SPEED IN THE SAND 'SECTIONS. CLEAN PASS TO WINDOW. PULLTHROUGH WINDOWAT 150R, 20 FT/MIN, 0.5 BPM WITH -2K WEIGHT BOBBLE. PERFORM 100' JOG ABOVE WINDOW THEN OPEN EDC. PUMP 10 BBLS LO / HI VIS SWEEPS. 10:30 - 11:00T 0.50 DRILL P 12,881.00 PROD1 STOP CT ABOVE WINDOWAND CLEAN OUT METAL SHAVINGS FROM GOOSENECK TWO GOOSENECK ROLLERS ARE SEEN NOT TO BE TURNING WHILE POOH. STOP POOH, INSPECT ROLLERS. GET ROLLERS TURNING AGAIN AND RE-GREASEALL ROLLERS. 11:00 - 1330 2.50 DRILL P 12,881.00 PROD1 CONTINUE POOH. HOLD 10.2 PPG AT WINDOW WHILE POOH. _ 13:30 - 17:30 4.00 DRILL N 12,881.00 PROD? AT SURFACE, PICK UP CT OFF GOOSENECK WITH TUGGERAND CHANGE OUTALL8 GOOSENECK ROLLERS. ONE ROLLER HAS SEIZED BEARINGS, ONE HAS SEVERE WEAR THROUGH THE ROLLER INTO THE THROUGH BOLT. KEEP 10.2 PPG ECD AT WINDOW WHILE CHANGING OUT ROLLERS. 17:30 - 21'.30 4.00 DRILL P 12,881.00 PROD? RIH - RIH TO 9180' -RATE BPM IN .51 OUT .89 1711 PSI - LOG TIE IN (CORRECTED - 24') -CLOSE EDC - RIP, PASS WINDOW AT 150L, 15 FT/MIN, NO PUMP - MOMENTARY SET DOWN @ 9246' (POPPED THROUGH) - RIH @ 0.5 BPM THROUGH OPEN HOLE - SET DOWN WITH 7K @ 12585' AND POPPED THROUGH -RIHANDTAG BOTTOM 281' 21:30 - 00:00 2.50 DRILL P 12,881.00 PROD1 CIRCULATE@ 2.41 BPM 2.41 - PREPARE LINER PILL - DYNAMIC FLOW CHECK - GOOD - POP LAYING IN LINER RUNNING PILL Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 19 of 19 Operation Summary Report Common Well Name: 11-11 APE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 7/21/2019 End Date. X3 -019G4 -C: (2,565,163.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/rime: 6/27/1985 12:00:OOAM Rig Release'. Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 8/1/2019 00:00 - 04:00 4.00 DRILL P 12,881.00 PROD? POH - POOH FROM 10979' LAYING IN LINER PILL - ORIENT TF 150R -PULL THROUGH WINDOW WITHOUT ISSUES OPEN EDC JET TRAY FOR DISPLACING WELLABOVE THE WINDOW TO 9.8 PPG - RATE BPM 4.04 IN 3.50 OUT 3800 PSI ECD 11.0 - PERFORM AGITATOR TEST @ 300' RATE 2.8 BPM VIBRATION 1-2 . -FLOW CHECK WITH BHA BELOW BOP'S - STATIC - INJECTOR OFF Q 04:00 0400 - 0530 1.50 DRILL P 12,881.00 PRODt LAY DOWN BHA - PRE JOB MEETING - BREAK BHA OUT AND LAY DOWN. BIT IS 1-1 " SWAP TO CON EVENT FOR THIS WELL. " Printed 9/3/2019 4:50:10PM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 1 of 19 Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/12019 End Date: X3 -019G4 -C: (1,183,314.00) Project PBU Site: 11 Rig Name/No.: CDR -2 Spud DateRme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table Q58.00ustt (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ .. (usR) _ 8/1/2019 05:30 - 0600 0.50 CASING P 12,881.00 RUNPRD FUNCTION TEST BOPS. 0600 - 07:00 1.00 CASING P 12,881.00 RUNPRD BOOT CABLE. MAKE UP SINGLE JOINT OF PH6. PUMP EXCESS SLACK OUT OF CT, RECOVER 192' AND CUT OFF. 07:00 - 09:30 2.50 _ CASING P 12,881.00 RUNPRD 'CHANGE OUT STRIPPER. PRESSURE TEST TO BOP TEST CRITERIA, GOOD. 0930 - 1230 _ 3.00 CASING P 12,881.00 RUNPRD WHILE TAKING OFF TIW THE CT CONNECTOR IS SEEN TO MOVE SLIGHTLY. CUT OFF CT CONNECTOR AND REPLACE IT. PULL TEST AND PT NEW CONNECTOR, GOOD, INSTALL NOZZLE FOR BALL CATCHER. LAUNCH BALL WITH 3000 PSI, BALL IS HEARD ROLLING. SWAP REEL TO 8.6# MUD WHILE PUMPING BALLAROUND. 12.30 - 00 00 11 50 CASING P 12,881.00 RUNPRD PJSM WITH RIG CREWAND BTT FOR WU 'LINER. VERIFY TALLY AND JT COUNT WITH DRILLER, WSL BTTANDTOOLPUSHER WU LINER AS PER APPROVED TALLY. AFTER 30 JTS IN THE WELL CONDUCT D7 DRILL WITH ROY CREW, WHILE CREW IS FILLING PIPE. CREW BRINGS JT ON THE SKATE BACK DOWNAND BRINGS UP SAFETY JOINT. SAFETY JOINT IS MADE UP TO LINER AND TORQUED, RAN INTO WELL. WELL IS SECURED (SIMULATED BOP CLOSURE) IN 4.5 MIN. CONDUCTAAR. CONTINUE MAKING UP LINER PER APPROVED TALLY (PIPE COUNT OUT IS CORRECT) MU DEPLOYMENT SLEEVE ASSEMBLY (LINER WEIGHT 27K) MU & RIH WITH PHO HANG OFF ON PIPE/SLIP RAMS CONNECT THE COIL COIL ON @ 23:45 TEST QTS TO 3500 PSI_ 8/2/2019 0000 - 01:45 1.75 CASING P 12,881.00 RUNPRD RIH WITH LINER TO 9230' -CORRECT DEPTH AT FIRST FLAG (-17') TO 9112.85' -RATE 0.3 BPM 01:45 - 03:00 1.25 CASING P 12,881.00 RUNPRD DISPLACE 9.8 PPG FLUID OUT OF WELLBORE WITH 8.6 PPG RATE BPM 1.48 IN 1.46 OUT 257_5 PSI 0300 - 0430 1.50 CASING P 12,881.00 RUNPRD RIH WITH LINER @ 50 FPM ABOVE WINDOW W/O PUMPS PU 52 SO 23 RATE BPM 0.3 IN 0.5 OUT 1927 PSI HOLDING 230 ON CHOKE TAG UP WITH 20K @ 10902' CONT WORKING LINER TOWARD BOTTOM Printed 9/3/2019 4:51.08PM *'All depths reported in Drillers Depths" North America - ALASKA - BP Paget of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date X3-01904-C'. (1,183,314.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Data/Time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 0430 - 09:30 5.00 CASING P 12,881.00 RUNPRD START MIXING SPACERS FOR MINERAL OIL. STACK WEIGHT AT 10928' CIRCULATE HERE AT 1.5 BPM, PICK UP AND WORK PIPE, NO PROGRESS. PUMP 2.57 BPM / 2.57 BPM FOR 10 MIN. TRY TO PICK UP AND CAN'T. PICKING UP 78K THEN 88K, NO MOVEMENT. HANG AT 63K AND BUILD SPACERS FOR MINERAL OIL, PUMP 2.53/2.48 BPM AT 3200 PSI. PUMP 10 BBLS 3% KCL, 20 BBLS LVT, 10 BBLS 3% KCL. WITH 5 BBLS LVT OUT TRAP PRESSURE AND WORK PIPE 90K TO OK TWO TIMES, NO MOVEMENT. PUMP 3 MORE BBLS OUT. SOAK FOR 10 MIN. TRAP 430 PSI. WORK PIPE 90K TO OK TWO TIMES, NO MOVEMENT. PUMP 2 MORE BBLS OUT, SOAK FOR 10 MIN. WORK PIPE OK TO 90K TWO TIMES, NO MOVEMENT. PUMP 3 MORE BBLS OIL OUT. SOAK FOR 10 MIN WORK PIPE OK TO 90K PIPE IS FREE. CONTINUE RIH. WORK PIPE DOWN TO 11000', PUMP MIN RATEAND CONTINUE WORKING PIPE DOWN. KEEP 300-400 PSI WHP WHILE RIH. PUMP MIN RATE WHENEVER PICKING UP. WORK DOWN TO 11080' AND TRY TO WORK PAST, NO FURTHER PROGRESS. OIL IS OUT OF THE OPEN HOLE NOW AND INTO THE CASING. PICK UP SLOWLY WHILE CIRCULATING LVT TO SURFACE. HOLD 300 PSI WHP. TRY TO WORK BACK DOWN, LOSING GROUND BACK 7O 11030'. PARK HERE AND CIRCULATE LVT OUT AT 1.50 / 1.50 BPM 2180 PSI. HOLD 380 PSI WHP. Printed 913/2019 4: 51,08PM **All depths reported in Drillers Depths" Printed 9/3/2019 4.51 08PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 3 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: COM -ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C'. (1,183,314,00) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud DateTme: 6/27/1985 12:00:00AM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr)_ (usft) 09:30 - 14:00 4.50 CASING P 12,881.00 RUNPRD CONDUCT PJSM FOR PUMPING LVT. PUMP 10 BBLS 3% KCL, 20 BBLS LVT, 10 BBLS 3% KCL. WITH 4 BBLS OUT START WORKING PIPE. KEEP 260-380 PSI WHIP WHEN PUMPING MIN RATE OR PUMPS OFF. ABLE TO WORK DOWN TO 11099'. PUMP 2 MORE BBLS OUT AND SOAK FOR 10 MIN, RIH TO 111421. PUMP 1 BBL OUT AND SOAK, RIH TO 11164'. PUMP 2 BBLOUTAND SOAK. WORKTO 11178'. PUMP 2 MORE BBLS OUT AND LET SOAK WORK TO 11208'. TRY AGAIN, SAME DEPTH. PUMP LAST BBL OUT AND SOAK FOR 10 MIN. WORK DOWN TO 11256'.WORK PIPE HERE A FEW TIMES, MAKE IT TO 11266'. NO FURTHER PROGRESS. PICK UP TO BREAKOVER THEN CIRCULATE 1.5 BPM FOR 10 MIN. SAME TAG 11266'. PUMP 1.5 BPM FOR 10 MINS, PICKUP IS 65K. SHUT DOWN PUMPAND TRAP PRESSURE. WORK PIPE AGAIN, LOSING GROUND BACK TO 11230'. CIRC LVT + SPACERS OUT TO TIGER TANK Printed 9/3/2019 4.51 08PM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 19 Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE(CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C:(1, 183, 314.00) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Daterl-ime: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usB (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usfq _ 14:00 - 21:00 7.00 CASING P 12,881.00 RUNPRD LVT PILL#3. PUMP 10 BBLS 3% KCl, 20 BBLS LVT, 10 BBLS 3% KCL. PUMP 3 BBLS OUT AND SHUT DOWN, TRAP 250 PSI WHP. SOAK FOR 10 MIN, THEN RIH TO 11267'. PUMP 1 BELS OUTAND SOAK FOR 5 MIN. NO PROGRESS. PUMP 1 BELS OUTAND SOAK FOR 10 MIN. WORK DOWN TO 11298'. PUMP 1 BBLS OUTAND SOAK FOR 10 MIN, WORK DOWN TO 11298'. PUMP 1.5 BBLS OUTAND SOAK FOR 15 MIN. WORK TO 11337' PUMP 1 BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11349' PUMP 1 BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11361' PUMP i BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11393', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11464', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11506', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP I BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11547', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11559', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11584', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 4 MIN WORK DOWN TO 11622' WORKING LINER DOWN TO 11640' PUMP 1 BBL OUT AND SOAK FOR 4 MIN WORK DOWN TO 11669', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN ALL LVT OUT OF PIPE ATTEMPT TO WORK PIPE DOWN WITHOUT SUCCESS CIRCULATE LVT t SPACERS OUT TO TIGER TANK Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths" North America - ALASKA - Blo Page 5 of 19 Operation Summary Report Common Well Name 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C: (1,183,314 00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud DateTme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usa) 21:00 - 00:00 3.00 CASING P 12,881.00 RUNPRD LVT PILL#4. PUMP 10 BBLS 3% KCL, 20 BBLS LVT, 10 BELS 3% KCL. PUMP 3 BBLS OUT AND SHUT DOWN, TRAP 250 PSI WHP. SOAK FOR 10 MIN, WORK STRING DOWN TO 11673' PUMP I BBLOUTANDSOAK FOR 15 MIN WORK DOWN TO 11721', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 5 MIN WORK DOWN TO 11725', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 15 MIN WORK DOWN TO 11737', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUTAND SOAK FOR 10 MIN WORK DOWN TO 11735', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11755', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN PUMP 2 BBLs OUTAND SOAK FOR 15 MIN WORK DOWN TO 11769', TRICKLE PUMP @ 0.1 BPM WHILE WORKING PIPE DOWN _ INCREASE LUBE IN MUD FROM 3% TO 3.5% 8/3/2019 00:00 - 04:00 4.00 CASING N 12,881.00 RUNPRD PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11810' PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN 7O 11833' PUMP 1 BBL OUTAND SOAK FOR 10 MIN WORK DOWN TO 10831' PUMP 1 BBL OUTAND SOAK FOR 15 MIN WORK DOWN TO 11839', TRICKLE PUMP @ �OT'8FM ORILE WORKING PIPE DOWN PUMP 1 BBL OUT AND SOAK FOR 15 MIN ATTEMPT TO WORK PIPE DOWN - NO MOVEMENT WORK STRING FROM 90 - 0 TWO TIMES - NO MOVEMENT TRAP 430 PSI PUMP 2 MORE BELS OF LVT OUT OF PIPE (18 TOTAL BBLS OF LVT OUTSIDE OF PIPE) ALLOW TO SOAK FOR 10 MIN WORK STRING FROM 90 - 0 TWO TIMES - NO MOVEMENT PUMP REMAINING TWO BBLS OF LVT OUT OF PIPE ALLOW TO SOAK FOR 10 MIN (TOTAL LVT OUT OF PIPE - 20 BELS) WORK STRING FROM 90-O TWO TIMES - NO MOVEMENT REDUCE WHP TO 250 WORK STRING FROM 90 - 0 TWO TIMES - NO MOVEMENT CIRCULATE LVT FROM WELLBORE @ 2.5 BPM 3100 PSI Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 6 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/12019 End Date. X3 -019G4 -C: (1,183,314,00) -Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date?ime: 627/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table (?58.00usft (above Mean Sea Level) Date From- To Hrs Task Code NPT Total Depth Phase Description of Operations - - (hr) (usft) 0400 - 0800 4.00 CASING N 12,881.00 RUNPRD LVT PILL Its. PUMP 10 BBLS 3% KCL, 20 BBLS LVT, 10 BBLS 3% KCL. WITH 10 BBLS OF LVT OUT OF LINER, TRAP 320 PSI WHIP. SOAK 15 MIN. CYCLE PIPE OK TO 90K TWO TIMES, NO MOVEMENT. GO TO 10K WEIGHT, ROLL PUMP SLOWLY AND PICK UP TO 90K TWO TIMES, NO MOVEMENT. PUMP 3 MORE BBLS OUT, SOAK 20 MIN. WORK PIPE 10K TO 90K TWO TIMES, NO MOVEMENT. PUMP 3 MORE BBLS OUT, SOAK 20 MIN. WORK PIPE 10K TO 90K TWO TIMES, NO MOVEMENT. PUMP FINAL 3 BBLS OUT, SOAK 20 MIN. WORK PIPE 10K TO 90K TWO TIMES, NO MOVEMENT. 08.00 - 10.30 2.50 CASING N 12,881.00 RUNPRD DISCUSS PLAN FORWARD WITH AND TEAM ANDACTINGWSUP. CIRCULATE LVT OUT TO TIGER TANK 2.48/ 2.47 BPM HOLD 320 PSI WHIP. REDUCE WHIP AS LVT IS PUMPED OUT OF THE WELL. AFTER LVT OUT OF WELL CIRCULATE 2.01 1.98 BPM WITH 220 PSI WHIP. CONDUCT KICK WHILE TRIPPING DRILL WITH BUSH CREW. ALL PERSONS REPORT TO POSITION AND SECURE WELL (SIMULATED) IN 1 MIN 30 SEC. 10'.30 - 12:30 2.00 CASING N 12,881.00 RUNPRD CONDUCT PJSM FOR PUMPING EP LUBE. PUMP 30 BBL EP MUD LUBE PILL DOWN CT AND OUT TO TIGER TANK AT 2.48 / 2.43 BPM. KEEP 220 PSI WHIP. SLOW TO 2 BPM IN TUBING. SEND EP LUBE PILL OUT TO TIGER TANK. 12:30 - 14:00 1.50 CASING N 12,881.00 RUNPRD CLEAN PITS AND MIX UP BEADED SPACER AS PER OCN #4. 14:00 - 16:30 2.50 CASING N 12,881.00 RUNPRD PJSM WITH CREWS TO REVIEW OCN #4. PUMP 30 BELS BEADED 3% KCL SPACER, 40 BBLS LVT, 10 BELS BEADED SPACER. PUMP 22 BBLS OUT AND SOAK FOR 15 MIN, WORK PIPE 2 TIMES 10K TO 88K, NO MOVEMENT. PUMP 10 BBLS MORE OUT, SOAK 10 MIN. CYCLE PIPE 10K TO 90K TWO TIMES, NO MOVEMENT. 16:30 - 17:30 1.00 CASING N 12,881.00 RUNPRD CIRCULATE LVT #6 TO SURFACE AND OUT TO TIGER TANK. HOLD 490 PSI WHIP WHILE CIRCULATING LVT UP THE CASING. Printed 9/3/2019 4.51.08PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 7 of 19 Operation Summary Report Common Well Name. 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C. (1,183,314.00 ) Project: PBU Site: 11 Rig Nama/No.: CDR -2 Spud Date rime: 6/27/1985 12:00:00AM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) _. (usft) 1730 - 21:30 4.00 CASING P 12,881.00 RUNPRD RELEASE FROM LINER POSITION REEL FOR BALL DROP VERIFY BALL SIZE (3/4" STEEL) AND LOAD INTO REEL ZERO VOLUME ON ORION BALL CONFIRMED ROLLING, RATE IN = 2.5 BPM, RATE OUT 2.3 BALL ON SEAT AT 49.49 BELS PRESSURE UP TO 4500 PSI HOLD FOR 2 MINUTES (SHEARED) LOWER RATE TO .3 BPM PU Y AFTER BREAK OVER WITH 40K TO CONFIRM RELEASED FROM LINER SWAP WELL OVER TO KCL, RATE IN = 2.5 BPM, OUT RATE=2.238PM 1812PSI KCL @ SURFACE ESTABILISH RATE PRESSURES @ 1 -425 PSI, 1.5 - 740 PSI, 2- 1145 PSI & 2.5 BPM - 1625 PSI HOLD PJSM FOR CEMENTING AND PT CEMENT LINE TO 250/5000 PSI Printed 9/3/2019 4:51.08PM "Ali depths reported in Drillers Depths" MIX 54.7 BBLS OF CEMENT: CEMENT WET AT 21:19 HR . ZERO IN MM ONCE DENSITY=13.5 PPG LOAD 49.7 BBLS 15.3 PPG CEMENT IN REEL SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS DISPLACE CEMENT WITH 8.5 PPG EXHAUST PILL RATE: 2.5 BPM IN, 2.45 BPM OUT ZERO OUT MM WITH CEMENT AT SHOE AT 84.5 BELS AWAY TAKE RETURNS TO PIT FOR MANUAL STRAP j SHUT DOWN PUMPS AT 105.6.6BBLS AWAY (21.1 BBLS BEHIND PIPE) LAUNCH PEE WEE DARTAND LINER WIPER PLUG AS FOLLOWS: PICK UP TO BREAKOVER+16 FT (11812') PER BTT REP, EXPOSE DOGS, SET DOWN AT (11816) (14 FT HIGHER) PU: 42 KLBS, SO: 20 KLBS SHIFT PEEWEE DART TO WIPER PLUG DOWN, PICK BACK UP TO 11812' MD AND SIDE EXHAUSTS BBLS SET DOWN IOKAT 11816' MD AND PRESSURE UP TO 2000PSI. PRESSURE UP ON WIPER PLUG AND ZERO MM. LINER WIPER PLUG SHEARED AT 3250 PSI (0.37 BBLS) DISPLACE LINER WIPER PLUG 24.0 BBLS DISPLACED AT 2.0 BPM: 3616 PSI PLUG DID NOT BUMP WITH CALCULATE DISPLACEMENT OF 25.5, PUMPED ADDITIONAL 0.5 BBLS (PLUG DID NOT BUMP) FINAL RATE @ 1.5 BPM WITH 3540 PSI STATIC PRESSURE 1451 PSI) DISCUSS WITH ODE, DECISION TO NOT PUMP AN ADDITIONAL FLUID CEMENT IN PLACE: 0000 HRS 40.3.8BBLS CEMENT BEHIND PIPE BASED ON MM OUT 37.6 BBLS BASED ON MANUAL STRAP TOTAL LOSSES FROM CEMENT EXIT SHOE O CEMENT IN PLACE: 9 BBLS 8/4/2019 0000 - 0030 0.50 CEMT P 12,881.00 RUNPRD OPEN BLEEDER AND CHECK FLOATS. GOOD TEST. CLOSE BLEEDER, PRESSURE UP TO 1100 PSI ON COIL, PICK UPAND CONFIRM PRESSURE DROP 00:30 - 01:30 1.00 CEMT P 12,861.00 RUNPRD CIRCULATE EXHAUST PILL OUT PUMP 5 BBLS AT 0.5 BBLS PER MINUTE AFTER PRESSURE DROP PICK UP OUT OF LINER TOP PUMP 4 BPM AT 2253 PSI i FOR 1 RETURNS Printed 9/3/2019 4.51:O8PM "All depths reported in Drillers Depths" North America - ALASKA - SP Page 8 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C: (1,183,314.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud DateTme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations __ _ (hr) _ (usR) _ 21:30 - 00:00 2.50 CEMT P 12,681.00 RUNPRD CEMENTLINER MIX 54.7 BBLS OF CEMENT: CEMENT WET AT 21:19 HR . ZERO IN MM ONCE DENSITY=13.5 PPG LOAD 49.7 BBLS 15.3 PPG CEMENT IN REEL SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS DISPLACE CEMENT WITH 8.5 PPG EXHAUST PILL RATE: 2.5 BPM IN, 2.45 BPM OUT ZERO OUT MM WITH CEMENT AT SHOE AT 84.5 BELS AWAY TAKE RETURNS TO PIT FOR MANUAL STRAP j SHUT DOWN PUMPS AT 105.6.6BBLS AWAY (21.1 BBLS BEHIND PIPE) LAUNCH PEE WEE DARTAND LINER WIPER PLUG AS FOLLOWS: PICK UP TO BREAKOVER+16 FT (11812') PER BTT REP, EXPOSE DOGS, SET DOWN AT (11816) (14 FT HIGHER) PU: 42 KLBS, SO: 20 KLBS SHIFT PEEWEE DART TO WIPER PLUG DOWN, PICK BACK UP TO 11812' MD AND SIDE EXHAUSTS BBLS SET DOWN IOKAT 11816' MD AND PRESSURE UP TO 2000PSI. PRESSURE UP ON WIPER PLUG AND ZERO MM. LINER WIPER PLUG SHEARED AT 3250 PSI (0.37 BBLS) DISPLACE LINER WIPER PLUG 24.0 BBLS DISPLACED AT 2.0 BPM: 3616 PSI PLUG DID NOT BUMP WITH CALCULATE DISPLACEMENT OF 25.5, PUMPED ADDITIONAL 0.5 BBLS (PLUG DID NOT BUMP) FINAL RATE @ 1.5 BPM WITH 3540 PSI STATIC PRESSURE 1451 PSI) DISCUSS WITH ODE, DECISION TO NOT PUMP AN ADDITIONAL FLUID CEMENT IN PLACE: 0000 HRS 40.3.8BBLS CEMENT BEHIND PIPE BASED ON MM OUT 37.6 BBLS BASED ON MANUAL STRAP TOTAL LOSSES FROM CEMENT EXIT SHOE O CEMENT IN PLACE: 9 BBLS 8/4/2019 0000 - 0030 0.50 CEMT P 12,881.00 RUNPRD OPEN BLEEDER AND CHECK FLOATS. GOOD TEST. CLOSE BLEEDER, PRESSURE UP TO 1100 PSI ON COIL, PICK UPAND CONFIRM PRESSURE DROP 00:30 - 01:30 1.00 CEMT P 12,861.00 RUNPRD CIRCULATE EXHAUST PILL OUT PUMP 5 BBLS AT 0.5 BBLS PER MINUTE AFTER PRESSURE DROP PICK UP OUT OF LINER TOP PUMP 4 BPM AT 2253 PSI i FOR 1 RETURNS Printed 9/3/2019 4.51:O8PM "All depths reported in Drillers Depths" Common Well Name. 11-11 Event Type: COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Operation Summary Report Start Date: 8/1/2019 Site: 71 AFE No End Date: X3 -019G4 -C'. (1,183.31400) Page 9 of 19 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) _ 01:30 - 03:45 2.25 CEMT P 12,881.00 RUNPRD POH PERFORM DYNAMIC FLOW CHECK -GOOD POH PUMPING 4.1 BPM IN 3.72 BPM OUT 2093 PSI JET EACH GLM AND X -NIPPLE HELDA DI WELL CONTROL TRIPPING DRILL MIN 21SECS TO SECURE THE WELL 03:45 - 04:15 0.50 CEMT P 12,881.00 RUNPRD FLOW CHECK THE WELL WITH THE BHA BELOW THE BOPS HELD AN AAR FOR THE DRILL PJSM FOR LAYING DOWN BHA 0415 - 0500 0.75 CEMT P 12,881.00 RUNPRD LAY DOWN LINER BHA POOH TO 280' INJECTOR OFF Q 04:18 HRS PULL BHA TO THE RIG FLOOR 'BREAK CTC LAY DOWN BHA. RECOVER 3/4" BALL. _ 0500 - 0700 2.00 EVAL P 12,881.00 OTHCMP MAKE UP NOZZLE, MAKE UP INJECTOR TO WELL. JET STACK, FLUSH ALL SURFACE LINES. CUT OFF CT CONNECTOR INSTALL INTERNAL DIMPLE CONNECTOR. 07:00 - 0730 0.50 EVAL P 12,881.00 OTHCMP RIG EVAC EXERCISE WITH 1-12S DRILL WITH BUSH CREW. ALL CREWS MUSTER AND ACCOUNTED FOR IN 3 MIN. CONDUCTAAR. 07:30 - 09:30 2.00 _ EVAL P 12,881.00 OTHCMP CHANGE OUT ALL 72 ELASTOMERS ON INJECTOR. PULL TEST CT CONNECTOR TO 50K, GOOD. PT TO 3500 PSI, GOOD. 09:30 - 19:00 9.50 EVAL N 12,881.00 OTHCMP PJSM WITH RPM CREW AND RIG CREW FOR MAKING UP RPM LOGGING TOOLS. VERIFY 1-1/4" CSH COUNT WITH DRILLER, BTT REPAND WSL. M/U BHA #6, LOGGING / CLEANOUT BHA. RATTLE EACH JOINTAS ITS PICKED UP. AFTER 35,65 JTS HOOK UP HEAD PIN TO SAFETY JOINTAND CIRCULATE THROUGH 1-1/4". INJECTOR ON @ 18:51 HRS PT QTS TO 3500 PSI 19:00 - 20:00 1.00 EVAL N 12,881.00 OTHCMP RIH WITH LOGGING / CLEANOUT BHA PUMP THROUGH BHAAT MAX RATE 1.8 BPM 2900 PSI REDUCE RATE TO 7500' @ 0.4 BPM, PnMed 9/3/2019 4:51 08PM **All depths reported in Drillers Depths" Common Well Name: 11-11 Event Type: COM- ONSHORE (CON) —. PBU North America - ALASKA - BP Operation Summary Report Start Date: 8/1/2019 End Date: Spud Date/Time: 6/27/1985 12:00:00AM Active datum: Kelly Bushing / Rotary Table @58.00usft (abov Date From - To Him Task (hr) 2000 - 00:00 4.00 EVAL 8/5/2019 00. 00 - 04:15 4.25 04:15 - 07:00 2.75 EVAL EVAL Mean Sea Level) Code NPT N N Total Depth (usft) 2,881.00 12,881.00 N 12,881.00 Page 10 of 19 APE No K3 -019G4 -C: (1,183,314,00) Rig Release: BPUOI: USA00001224 Phase Description of Operations OTHCMP START LOGGING FROM 7500' LOG IN @ 30 FPM RATE 1.75 BPM IN 1.75 BPM OUT OBSERVED A 200 PSI INCREASE @ 7720' NO WOB OBSERVED WORK AREA FROM 7700' TO 7730' PULL BACK TO 7500 AND RESTART LOG LOG FROM 7500' TO 10517'@ 30 FPM 1.75 BPM 3400 - 3660 PSI TAGGED AT 10517' ATTEMPTTO WORK PAST WITHOUT SUCCESS BU VOLUME SHOWED WIPER PLUG RUBBER PRESSURE INCREASED TO 3900 PSI DISCUSSED WITH ODEAND CELIBATE WSUP AND DECESION WAS MADE TO LOG OUT TO THE TOP OF THE LINER__ OTHCMP LOG OUT OF THE HOLE TO 10194'(5K OVERPULL, PRESSURE INCREASED FROM 4000 PSI TO 4400 PSI) ATTEMPT TO WORK PIPE DOWN WITHOUT 'SUCCESS CONTINUE TO WORK PIPE FROM 10194' TO 10189' DISCUSS WITH DELIGATE WSUP PUMP 5 BBL HI VIS SWEEP AT .5 BPM DOWN THE COIL, INCREASE TO 1.3 BPM AS IT EXITED THE MILL. CONT WORKING PIPE 5K UP AND DOWn PUMP A 5 BBL HI VIS SWEEP HOLD 250 PSI ON THE WELLHEADAND WORK PIPE DUMP WELLHEAD PRESSURE WITH SWEEP COMING OUT OF THE MILL RATE 1.12 BPM IN 1.11 BPM OUT STOP PUMPS, ALLOW PRESSURE TO BLEED DOWN TO 220 PSI, PRESSURE DOWN THE ANNULUS TO 500 PSI PULLED 16K OVER, PIPE POPPED FREE OTHCMP POOH RATE BPM 1.47 IN 1.17 OUT INCREASE RATE TO 1.70 /1.50 BPM PULL 40 FT/MIN. FLOW CHECK BEFORE BHA ENTERS BOPS, STATIC. OPEN RISER AND INSPECT LAST 100' OF CT, GOOD. Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths'" North America - ALASKA - BP Page 11 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE(CON) Start Date: 8/1/2019 End Date: X3-019G4-C:(1,183,314.00) Project: PBU Site: 11 Rig Name/No.: CDR-2 Spud Date/Time: 6/27/1985 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 07:00 - 14ol) 7.00 EVAL N 12,881.00 OTHCMP UD 2 JTS OF 2-1/16" CSH AND 105 JTS OF 1-1/4" CSH. AFTER JT#37 CONDUCT KICK DRILL WITH MICAH BUSH CREW. CREW LAYS DOWN JOINTAND GETS SAFETY JOINT ON THE SKATE. CREW PICKS UP SAFETY JOINTAND TORQUES IT UP, RUN IN TO CORRECT SPACEOUT. WELL IS SECURED (SIMULATED) AND CREWS REPORT TO STATIONS IN 3 MIN 30 SEC, CONDUCTAAR. CONTINUE UD 1-1/4" CSH. AT MARKER PUP PJSM WITH RPM CREWAND NABORS CREW. PULL REMAINING 10 JTS AND RPM TOOL OUT. UD 2 MORE JTS OF 1-1/4" CSH AND MILL AND MOTOR. _ _ 14:00 - 18:00 4.00 BOPSUR P 12,881.00 OTHCMP VAC OUT STACK INSTALL BOP TEST RISER. MAKE UP NOZZLE TO END OF CT. FLUSH CHOKE WITH WATER AND GREASE. REVIEW PROCEDURE FOR TESTING BOP'S FLUID PACK AND PERFORM SHELL TEST 1800 - 0000 8.00 BOPSUP P 12,88100 OTHCMP TEST BOPE AS PER AOGCC AND BP GUIDELINES. ALL TESTS TO 250 13500 PSI. TESTIS WITNESSED BY WSLAND TOOLPUSHER. ADAM EARL WITH AOGCC WAIVED TEST WITNESS 8/4/20190606HRS TEST 1: IRV, STRIPPER, C9, C10 BACKWARDS-PASS TEST2: BLIND/SHEARS, R1, BOA, 31, B4 PASS TEST 3: ANNULAR (2-3/8"), TIW#1, B3, B2, BL1 PASS TEST 4: UPPER 2-3/8" PIPE /SLIP, TIW 1112, BL2, R2, T2, C15 PASS TEST 5: C15, T1, C11 PASS TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 FAIL /PASS, GREASE TV2 AND RETEST TEST 7: LOWER 2-3/8" PIPE / SLIP, C5, C6, C8, TV1 PASS TEST 8: CHOKE A, CHOKE C PASS PERFORM ACCUMULATOR DRAW DOWN TEST INSTALL SAVER SUB TEST 9: ANNULAR (3-1/2") C1, C4 PASS PASS _TEST_ 10: VARIABLES (3-1/2") C2, C3 PASS _ 8/8/2019 00:00 - 02:30 2.50 BOPSUR P 12,881.00 OTHCMP PULLTESTJOINT. REMOVE TEST RISERS MAKE UP DRILLING RISERS. PRESSURE TEST TO 3500 PSI CHECK VALVE_ ALIGNMENT _ 02:30 - 03:30 1.00 EVAL P 12,881.00 OTHCMP PUMP 3/4" BALL THROUGH COIL WHILE DISPLACING COILAND SURFACE LINES TO KCL RECOVER BALL FROM NOZZLE Printed 9/3/2019 4:51,08PM "AII depths reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Page 12 of 19 Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C: (1,183,314.00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/Time: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) .0330 - 10:30 7.00 EVAL N 12,881.00 OTHCMP PJSM WITH RPM CREW AND RIG CREW FOR MAKING CLEANOUT TOOLS. VERIFY 1-1/4" CSH COUNT WITH DRILLER, BTT REP AND WSL. M/U BHA#7, CLEANOUT BHA. D1 WELL CONTROL DRILL WITH MICAH BUSH'S CREW 2:20 SEC TO SECURE WELL 'WITH SAFETY JOINT CONTINUE M/U 1-1/4" CSH. M/U 2-1/16" CSH. WU INJECTOR TO WELL. 10:30 - 13:30 3.00 EVAL N 12,881.00 OTHCMP RIH WITH CLEANOUT BHA. WT CHECKAT LINER TOP IS 33K. ENTER LINER 20 FT/MIN PUMP 1.75 BPM WITH 2080 PSI. CLEAN PASS TO 2-7/8" LINER TOP, SLIGHT PRESSURE INCREASE WHEN ENTERING. ,RIH 30 FT/MIN. WEIGHT CHECKAT 9650' IS 44K. CLEAN PASS TO 10250', DEEPER THAN YESTERDAYS STUCK POINT OF 10194'. PULL WIPER TRIP FROM 10250' BACK TO 10150'. CLEAN PASS, UP WT IS 42K. 13:30 - 17:00 3.50 EVAL N 12,881.00 OTHCMP RIH SLOWLY, TAG AT 10520' AND STALL. " UP WEIGHT IS 45K, CLEAN. PUMP 5 BBLS HI -VIS. EASE DOWN AND START MILLING. STALL AT 11520.5'. PICKUP IS 45K CLEAN. PULL WIPER TRIPLET SWEEP EXIT BIT. EASE DOWN AGAIN AND PARKAT 11520.43'. STALL AFTER A FEW MINUTES, UPWEIGHT IS 60K. BRING PUMP UP, STILL DRAGGING HEAVY. REDUCE PUMP AND RIH IS CLEAN. PICKUP IS CLEAN AT 1.77 BPM. PULL SHORT WIPER TRIP, START INCREASE LUBES IN FLUID SYSTEM TO 2% BARALUBE GOLDSEAL. CONTINUE MILLING FROM 10519.0'. STALL SEVERAL MORE TIMES IN THIS AREA. MAKE STEADY PROGRESS BY SITTING AND LET IT MILL OFF. BOTTOMS UP SAMPLE SHOWS ALUMINUM AND RUBBER FLAKES. AT 10522.5' PUMP 5 BBLS HI -VIS. INCREASE ROP. APPEAR TO BE MILLING CEMENT. CONTINUE MILLING TO 10530' PILLOUTOFMILL )1700 - 1845 1.75 EVAL N 12,881.00 OTHCMP POOH FROM 10530' TO 7500'@ 30 FT/MIN RATE 1.74 BPM IN 1.63 BPM OUT PRESSURE 2340 18:45 - 21:15 2.50 EVAL N 12,881.00 OTHCMP RIH TO 10530' @ 40 FT/MIN NO ISSUES DURING THE WIPER TRIP OBSERVED"STEEL WOOL"AND SMAL PIECES OF RUBBER WITH THE HI VIS PILLAT SURFACE Printed 9/3/2019 4:51:08PM *'All depths reported in Drillers Depths" North America - ALASKA - BP Page 13 of 19 Operation Summary Report Common Well Name: 11-11 APE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date: X3 -019G4 -C: (1,183,314,00) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud Date/Time: 6/27/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) BPUOI: USA00001224 Date From - To Him Task Code NPT Total Depth Phase Description of Operations _. (hj _ (um) 21:15 - 00:00 2.75 EVAL N 12,881 00 OTHCMP MILL FROM 10530' T610750' RATE 1.72 BPM IN 1.71 BPM OUT FREE SPIN - 2570 PSI TAG BOTTOM WITH 100 PSI INCREASE ON BOTTOM BUT MAKING NO HEAD WAY WOB (SURFACE) 2-5K PU 45 50 20 SET 5 K (SURFACE) DOWN WITHOUT PUMPS BRING PUMPS ONLINE WITH 100 PSI PRESSURE INCREASE OVER FREE SPIN ALLOW TIME FOR MILL TO WORK ON BOTTOM MAINTAIN 5-7 WOB (SURFACE) PRESSURE SLOWLY INCREASED TO 2770- 2900 PSI ROP 30-80 FPH j 200'WIPER TRIPAT 10800' -CLEAN PU RATE BPM 1.79 IN 1.77 OUT FREE SPIN 2680 PSI SLOWLY TAG BOTTOM WOB 2-6 (SURFACE) PRESSURE SLOWLY INCREASED TO 2770- 2900 PSI ROP SO FPH - @ 10669'WOB WENT TO O AND INC ROP TO 180 FPH TO 10674' . MOTOR STALLED Q 10874', PU CLEAN CONT MILLING FROM 10674' WOB 0 ROP 168 FPH 200' WIPER @ 10700' - CLEAN PU CONT MILLINGMIASHING FROM 10700' - 10750' WOB 0 PRESSURE 2950 ROP 100 PUMP 5 BBL HI VIS SWEEPSAS NEEDED BU FROM BELOW HARD CEMENT WAS BLINDING THE SHAKERS (CEMENT) _ 8!//2019 0000 - 01:00 1.00 EVAL N 12,881.00 OTHCMP CLEANOUT LINER 200' WIPER AT 10750' RATE 1.721N 1.74 OUT FREE SPIN 2830 MILL/ WASH FROM 10750' TO 10815' PRESSURE 2860 ROP 103 PUMPS BBLHIVIS PILL 01:00 - 04:00 3.00 EVAL N 12,881.00 OTHCMP LONG WIPER TRIP TO ABOVE TOL Q 40 FPM RATE IN 1.73 OUT 1.58 2880 PSI SIT DOWN WITH 3K (017708: WORK ACROSS AREA WITH NO FARTHER ISSUES PUMP A5 BBL HI -VIS WHILE RIH TO SWEEP TOL Printed 9/3/2019 4:51:08PM '•AII depths reported in Drillers Depths" Common Well Name: 11-11 Event Type: COM- ONSHORE(CON) Project: PBU Rig Name/No.: CDR -2 North America - ALASKA - BP Operation Summary Report Start Date: 8/1/2019 End Date: Site: 11 Spud Date/Time: 6/27/1985 12:00:00AM Page 14 of 19 AFE No X3 -019G4 -C'.(1,183,314,00) Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00us8 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usff) 04:00 - 0830 4.50 EVAL N 12,881.00 OTHCMP CLEANOUT LINER RATE 1.72 IN 1.74 OUT MUD WT 8.4 IN/OUT FREE SPIN 2790 MILL/ WASH FROM 10815' PRESSURE 2870 ROP 103 PUMP 5 BBL HI -VIS PILLS AS NEEDED 10866' WOB 3-4 PRESSURE 2900 ROP 100 10886,REDUCE ROP TO 73 AND INCREASE IN PRESSURE TO 2950 WOB 2-3 10888' ROP 100 PRESSURE 2804 WOB 2-3 200' WIPER @ 10915' MILL CEMENT FROM 10915'AT 60-100 FT/HR. AT 10935' PUMP 5 BBLS HI -VIS SWEEP. AT 10945' PULL 10V WIPER TRIP. CLEAN PASS UP AND DOWN. AT 1101 5'PULL 200' WIPER TRIP. CLEAN PASS UP AND DOWN. MILL TO 11100'. SWEEP HAS EXITED THE MILL. 0830 - 13'.00 4.50 EVAL N 12,881.00 OTHCMP 'LONG WIPER TO LINER TOP. 17811.63 BPM 8.42 / 6.39 PPG IN / OUT PUMP 5 BBL HI -VIS SWEEP EXITING MILLAT THE LINER TOP. PUMP SWEEP TO SURFACE. SWEEP DOES NOT BRING BACK ANY ADDITIONAL CUTTINGS. RIH TO BOTTOM. STACK WEIGHT AND STALLAT 9700'. PICKUP IS CLEAN, 45K. RUN PAST CLEAN TO 9750' THEN JOG BACK TO 9600'. CLEAN PASS BOTH WAYS. PUMP 5 BBLS SWEEP DOWN, CONTINUE RIH. 13:00 - 20:30 7.50 EVAL N 12,881.00 OTHCMP CONTINUE MILLING CMT PUMPING HI -VIS EVERY 100' OF MILLED CMT OR AS NEEDED INCREASE LSRV FROM 7K TO 15-20K 1.801N 1.79 OUT 2549 - 2906 PSI PUMP 5 BBL HI -VIS PILL 10450' POOH TO 7651'@ 50 FPM CHASING PILL OUT OF THE HOLE FLOW CHECK -STATIC 20:30 - 21:45 1.25 EVAL P 12,881.00 OTHCMP PERFORM PT ON LINER PRESSURE UP TO 2500 PSI 2 HESITATIONS 500 AND 1000 PSI 30 MIN TEST START 2520 PSI END 2398 PSI 2.3 BBLS PUMPED 2.4 BBLS BLED BACK (INCLUDES SOME RISER VOLUME) FINAL 15 MIN BLEED RATE AVG 3.2 PSIIMIN ON A DECLINING TREND 21'45 - 23:15 1.50 EVAL N 12,881.00 OTHCMP RIH TO 11450 @ 50 FPM RATE BPM IN 1.74 OUT 1.84 23:15 - 00:00 0.75 EVAL N 12,881.00 OTHCMP CONTINUE MILLING CMT 10450' TO 10490' PUMPING HI -VIS EVERY 100' OF MILLED CMT OR AS NEEDED 1.72 IN 1.75 OUT FREE SPIN 2930 PSI WOB 2-3 ROP 60 ON BTM PSI 3140-3180 Printed 9/3/2019 4:51:08PM "AII depths reported in Drillers Depths" Common Well Name: 11-11 Event Type: COM- ONSHORE (CON) PBU North America - ALASKA - BP Page 15 of 19 1 Operation Summary Report AFE No Start Date: 8/1/2019 End Dale: 7(3 -019G4 -C: (1,183,314.00) Site: 11 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) 8/8/2019 00:00 - 09:00 9.00 EVAL N 0900 - 1400 5.00 EVAL N 1400 - 1845 4.75 EVAL N 18:45 - 0000 5.25 EVAL P 8/9/2019 00:00 - 02:15 2.25 EVAL P 0215 - 0315 1.00 EVAL P 03:15 - 10:00 6.75 EVAL P BPUOI: USA00001224 Total Depth Phase Description of Operations (usft)._ _ 12,881.00 OTHCMP CONTINUE MILLING CMT FROM 10490' PUMPING HI -VIS PILLAS NEEDED 1.721N 1.74 OUT FREE SPIN 2930 PSI WOB 2-4 ON BTM PSI 3150 - 3190 ROP 30-60 PUMP 5 BBL HI VIS SWEEP SHORT WIPER TRIP TO FROM 10654' TO 9650'- CLEAN PASS UPAND DOWN 12,881.00 OTHCMP ' MILLED TO 11845% SAT DOWN 8K WITH 500 PSI INCREASE IN DIFFE-R-E-N-TI-AURTS-SKUTFE INDICATINGWEARE POSSIBLYATTHE LANDING COLLAR. DISCUSS WITH ODE WSUPT AND AGREE WE ARE AS DEEP AS WE WANT TO MILL. - PUMP 10 BBL HI -VIS PILL FOLLOWED BY 1% KCL .- PUMP HI -VIS OUT THEN POOH LAYING IN KCL '- STOP 200'ABOVE PBTD AND PAINT A WHITE FLAG FOR DEPTH REFEREANCE - STOP AT 7500'AND PAINT AN ORANGE FLAG '- AT THE TOL, LOAD A I/2"BALL TO OPEN THE CIRC SUB AND POOH 12,881.00 OTHCMP . PJSM TO LD CLEAN OUT BHA .-FLOW CHECK WELL - GOOD NO FLOW, PU THE INJECTOR AND INSPECT THE LAST 150' OF COIL - REMOVE INJECTOR AND LD THE CSH/BHA - INSPECT MILL IN GAUGE - VERY SLKIGHT AMOUNT OF METAL EMBEDDED IN MILL FACE -RECOVERED 112" BALL FROM CIRC SUB 12,881 00 OTHCMP PJSM TO MU LOGGING BHA - MU LOGGING BHA PER TALLY - SET RPM LOGGING TOOL FORA 5 H DELAY (SET TO START @ 01:34 HRS) - MU & RIH WITH CSH 12,881.00 OTHCMP MU RPM LOGGING BHA - RPM TOOL STARTED @ 01:34 - INJECTOR ON fid, 02:00 - PT QTS TO 3500 - BHA WT 1 O 12,881.00 OTHCMP RIH WITH RPM LOGGING BHA - RIH @ 80 FPM - RATE BPM 0.4 IN 0.8 OUT 302 PSI -VERIFY DEPTH A FLAG (7501 85) -3.43' DID NOT CORRECT - Q 7500' PU 34 SO 18 12,881.00 OTHCMP RPM LOGGING - LOG DOWN FROM 7600' @ 30 FPM - RATE BPM 0.4 IN 0.5 OUT 300 PSI - TAG AT 11841', PAUSE THEN LOG UP AT 20 FPM - END LOGGING AT 9135', POOH TO TOL - STOP AT 7600.26' (EDP 4193.51') AND PAINT A WHITE FLAG FOR DEPTH REFERENCEAND LOADA 1/2" BALLTO OPEN CIRC SUB WHILE POOH Printed 9/3/2019 4:51.08PM ••AAI depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. 11-11 Event Type: COM -ONSHORE (CON) Start Date: 8/1/2019 End Date: AFE No (1.183.314.00) Page 16 of 19 Project: PBU Site: 11 - FLOW CHECK AT SURFACE Rig Name/No.: CDR -2 Spud Date/Time: 8/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. DISCUSS RPM SOURCE 8 RED ZONE SPUD[: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usfi (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 16:00 6.00 EVAL P 12,881.00 OTHCMP BHA LAY DOWN Printed 9/3/2019 4:51:08PM "All depths reported in Drillers Depths" - FLOW CHECK AT SURFACE - PJSM TO REVIEW PROCEDURE AND DISCUSS RPM SOURCE 8 RED ZONE i MANAGMENT -GOOD NO FLOW, PU THE INJECTOR INSPECTING THE LAST 50' OF COILAND TAG UP - COIL LOOKS GOOD, REMOVE THE INJECTOR AND LD THE CSH -" HOLD A KWr DRILL"' WELL SECURED WITH SAFETY JOINT IN 2:26 ALL HANDS CALLED IN 2:34, HOLD AAR - PULL B LD THE SAFETY JOINTAND CONTINUE PULLING CSH - BHA OOH, NO 1/2" BALL RECOVERED, LOAD OUT LOGGING TOOL TO CHECK FOR AND _ SEND OFF DATA 16.00 - 16:30 0.50 EVAL P 12,881.00 OTHCMP CIRCULATE COIL TO RETRIEVE 1/2" BALL - MU NOZZLE BHA WITH CIRC SUB TO SEE IF THE BALL LANDS ON SEAT - STAB ON AND CIRCULATE VERY HIGH VIS -PILL -ONLINE WITH PUMP, PUMPED 2.7 BBLSAND PRESSURE SPIKED AND CIRC SUB SHEARED - PU THE INJECTOR AND RECOVERED THE BALL 16:30 - 2030 4.00 EVAL N 12,881.00 OTHCMP WAIT ON LOGS, PERF MEMO AND PERF GUNS -RPM LOGGING TOOL FAILED AND DID NOT RETRIEVE THE REQUIRED DATA - DISCUSS WITH ODE AND DECISION WAS MADE TO RERUN RPM LOG'S - NEW RPM LOGGING TOOLS WERE RESOURCED 20:30 - 00:00 3.50 EVAL N 12,881.00 OTHCMP MU RPM LOGGING BHA - PJSM FOR MAKING UP LOGGING BHA - MU UP LOGGING ASSEMBLY PER TALLAND BAKER REP INSTRUCTIONS FILL PIPE AND BREAK CIRC ON JT 35 8/10/2019 0000 - 0330 3.50 EVAL N 12,881.00 OTHCMP CONT MNU RPM LOGGING BHA - MU 1.25 CSH AND ASSOCIATED TOOLS - FILL PIPE AND BREAK CIRC ON JT 75 -BHAWT 10K - INJECTOR ON @ 03:30 - PT QTS TO 3500 If _ 03:30 - 06:00 2.50 EVAL N 12,881.00 OTHCMP RIH WITH RPM LOGGING TOOLS RATE BPM 0.41N 0.6 OUT - STOP AT 7600 AND WAIT FOR BAKER ATLAS TO START LOG 06:00 - 13:00 7.00 EVAL N 12,881.00 OTHCMP START LOGGING OPS - RIH LOGGING AT 30 FPM TO PBTD -TAG AT 11842.67' - PAUSE FOR 1 MIN THEN POOH LOGGING UP AT 20 FPM - STOP AT 7600', PAINT A FLAG, DROP A 1/2" BALL TO OPEN THE CIRC SUB AND POOH -GOOD INDICATION THE BALL LANDED AND SHEARED THE CIRC SUB OPEN AT 98 BELS -FLOW CHECKAT 100' FROM SURFACE Printed 9/3/2019 4:51:08PM "All depths reported in Drillers Depths" Rig Contractor. NABORSALASKA DRILLING INC. North America - ALASKA - BP Page 17 of 19 Operation Summary Report Common Well Name: 11-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/1/2019 End Date'. X3 -019G4 -C: (1,183,314.00 ) Project: PSU Site: 11 Rig Name/No.: GDR -2 Spud Date/Time: 6/27/1985 12,00 OOAM Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 13:00 - 18:00 5.00 EVAL N 12,881.00 OTHCMP BHAHANDLINGOPS -GOOD NO FLOW, PU THE INJECTOR AND TAG UP - REMOVE INJECTOR AND LD THE CSH I- LD RPM LOGGING TOOLS - DOWNLOAD DATA (GOOG DATA) - NOTIFY ODE AND WSUP - DATA SENT (11? 18:00 HRS 1800 - 0000 6.00 EVAL P 12,881.00 OTHCMP WAIT ON FINAL PERF MEMO FROM RPM LOG DATA, WAIT FOR HALLIBURTON TCP TO PREPARE GUNS. - RECIEVE FINAL PERFORATION MEMO FROM ANCHORAGE TEAM AT 20: 35 him - WAIT FOR HALLIBURTON TCP TO ADJUST GUNS BASED ON NEW PERFORATION MEMO -"HELD A FIRE DRILL WITH A CREW RESPONSE TIME OF 55 SECS" '- PREPARE RIG FLOOR, PIPE SHEDAND TALLY FOR PERF GUNS - HALLIBURTON ARRIVE ON LOCATION AT 23:05 HRS '- LOAD PERF GUNS IN SHED, REMOVE TAPE, 8/11/2019 00:00 0030 0.50 0030 - 0530 5.00 AND WALK THROUGH BHA PERF P 12,881.00 OTHCMP PREPARE PERF BHA — FINAL WALK DOWN WITH DRILLER _ - SET DELAY ON FIRING HEAD PERF P 12,881.00 OTHCMP MAKE UP 471' OF HALLIBURTON TCP 2" MILLENIUM GUNS, a SPF - HOLD PJSM - PICK UP GUNS PER HALLIBURTON TCP - FIRING HEAD ON AT 04:40 HRS - MAKE UP REMAINDER OF BHA# 10 - BHA WT 14K - INJECTOR ON @ 05:20 - PT QTS TO 3500 SPI Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Weil Name: 11-11 AFE No Event Type: COM- ONSHORE(CON) Start Date: 8/1/2019 End Date. X3-019G4-C'.(1,183,314o0) Project: PBU Site: 11 Page 18 of 19 Rig Contractor: NABORSALASKA DRILLING INC. Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) BPU01: USA00001224 Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft)_ 05:30 - 13:30 8.00 PERF P 12,881.00 OTHCMP RIH WITH PERF ASSEMBLY -CIRC AT MIN RATE - STOP AT FLAG 7603.44 (UNCORRECTED) - CORRECT DEPTH TO 7586.05' (-17.39- CORRECTION) -Wr CK=35K RIHWr=19K -RIH TO PBTD - DISCUSS PERF MEMO DEPTHS WITH TOWN BASED ON CORRECTED PBTD AND LENGTH FROM BULLNOSE TO BOTTOM SHOT - PERF MEMO REVISED TO BOTTOM SHOT DEPTH OF 117951, RECIEVED OCN FROM ODE TO CONFIRM CHANGE - TAG AT 11825.29, PU AND GET UP Wr AT 44K - RETAG, PU TO 5K LESS AT 39K AND STOP, CORRECTTO BOTTOM SHOTAT 11600.15' AND START THE FIRING SEQUENCE - RIH TO TAG, PU TO 11795' AND WAIT FOR GUNS TO FIRE -GUNS FIRED WITH GOOD INDICATION, POOH HOLDING 200 Psi WHP - LOST 2.6 BELS TO GET WHP BACK TO 200 PSI - ABOVE TOL, LOST 6.1 BELS ON TRIP TO TOL, BLEED OFF WHP SLOWLY, VERIFY 1:1 RETURNS THEN SHUT DOWN TO FLOW CHECK - GOOD NO FLOW, POOH - AT SURFACE, LOST 5 BELS FROM TOL TO SURF, SHUT DOWN PUMPAND RIH 700' - CIRCA BOTTOMS UP, PURGE LUBRICATOR THEN POOH TO FLOW CHECK - GOOD NO FLOW, VERIFY NO CO GAS WITH _ 4 -GAS METER AT _THE LUBRICATOR 13:30 - 18:00 4.50 PERF P 12,881.00 OTHCMP LD BHA OPS - NO GAS, PU THE INJECTOR, TAG UP, REMOVE INJECTOR AND LD THE BHA - 5 JTS FROM THE FIRING HEAD, STOPAND HOLD A PJSM WITH NABORS AND HES CREWS TO REVIEW PERF GUN HANDING PROCEDURES, DISCUSS - PERSONAL AND PROCESS SAFETY (WELL CONTROL), RED ZONE MANAGEMENT, ROLES AN RESPONSIBILITIES, TRAPPED PRESSURE AND CO GAS. TCP HAND HAS A PERSONAL CO METER ON HIM. - PULL LAST 5 JTS, SWAP OVER TO PERF GUN HANDLING EQUIPMENT. -COMFOR_MATION GUN HAD FIRED 1800 - 0000 6.00 PERF P 12,881.00 OTHCMP PUMP SLACK MANAGEMENT - REMOVE NOZZLE BHAAND STAB ON WELL - LINE UPAND PUMP SLACK BACK - PU INJECTOR, CUT OFF CTC, RU CUTTER AND CUT COIL - CUT 310' OF COIL- NO WIRE, MU CTC, PULL TEST TO 50K - MAKE UP STINGER AND PUMP SLACK FORWARD - REHEAD UQC FOR BHI - SERVICE TREE Pnmed 9/3/2019 4:51 08PM **All depths reported in Drillers Depths" Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 19 of 19 Operation Summary Report Common Well Name: 11 -it — - — --- — AFE No Event Type: COM- ONSHORE (CON) Start Date. 8/1/2019 End Date. X3 -019G4 -C. (1,183,314 00 ) Project: PBU Site: 11 Rig Name/No.: CDR -2 Spud DateRme: 6/27/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001224 Active datum: Kelly Bushing / Rotary Table @58.00usfi (above Mean Sea Levet) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft). — _ _ 8/12/2019 0000 - 07:00 7.00 PERF P 12,881.00 OTHCMP END OF WELL OPS - PT TEST BHI UQC - BLOW DOWN REEL - INSTALL NIGHT CAP AND BLOW DOWN SURFACE LINES - FLUID PACK & LTT ON MASTER AND SWAB VALVES TO 3500# -REMOVE MPD LINE -REMOVEBOPS -INSTALL TREE CAP - LTT TREE CAP TO 3500# RIG RELEASE AT 7:00 ON 8/12/2019 -MOVE TO 11-37A. Printed 9/3/2019 4:51:08PM **All depths reported in Drillers Depths" T/1/0=-17/0/0/0 Temp= SI Post rig work (Freeze protect TBG) Pumped 2 bbls 50/50 followed by 38 bbls dsl with a 4 bbl 50/50 meth cap. Valve positions= Campanion valves= 8/12/2019 closed MV= Closed CV= OTG FWHP= 1500/0/0/0 TWO = 0/0/0. Post CDR2 Tree conversion. Remove KL #6 and CDR2 Tree #2. Inspect MV ring grove. Install 5x7 FMC 120 upper tree. Torque MV x SSV to API specs. Torque THA x MV to API specs. RU CIW lubricator and PT against TWC to 350/5000psi for 5 minutes each (PASS) Run down and pull 4"'H' TWC #432 at 140" RD lubricator and install tree cap. PT 8/13/2019 Ito 500psi PASS). RDMO ***Job Complete*** SEE LOG FOR DETAILS Final WHIP 0/0/0. TWO. Vac/0/0. Set 4" H TWC #432 @ 120". PT tree cap to 500psi for 5min. Passed. Job 8/13/2019 Complete. See log. Final WHP's TWC/0/0. ***WELL S/I ON ARRIVAL*** (CTD) DRIFTED TO DEVIATION @ 9,653' SLM w/ 2.25" CENT, 1.75" S-BLR. DRIFTED TO TOL @ 7,718' MD w/ DPU & KB LTP DRIFT. SET 45 KB PACKER, PTSA w/ 2-7/8" XX PLUG IN TOL @ 7,712' MD. 8/16/2019 ***WSR CONTINUED ON 8/17/19*** T/I/0= vac/vac/62 Temp= S/I (LRS Unit 70 - Assist Slickline: Load and Test) PJSM, Rig up 8/16/2019 Ito P-Sub ***WSR continued on 08-17-19*** ***WSR CONTINUED FROM 8/16/19*** (CTD) LRS OBTAINED 2,500 psi PRESSURE TEST ON LTP. SET 4-1/2" CATCHER ON LTP @ 7,718' MD. PULLED BK-DGLV'S FROM STATION'S #5 & #6. SET BK-LGLV IN ST# 6 @ 3,547' MD. SET BK-OGLV IN ST# 5 @ 5,458' MD. PULLED EMPTY CATCHER FROM LTP @ 7,715' SLM. PULLED 2-7/8" XX PLUG FROM X-NIP IN LTP 7,721 MD (metal shavings & cement in plug body) 8/17/2019 ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** 1 ***WSR continued from 08-16-19*** (LRS Unit 70 - Assist Slickline: Load and Test) Pumped 6.7 bbls 55*F crude down TBG to set check LTP. MIT-T PASSED to 2420 psi, Target Pressure= 2250 psi, Max Applied Pressure= 2500 psi. Pressured TBG to 2496 psi with 2.5 bbls crude. TBG lost 52 psi in 1st 15 minutes and 24 psi in 2nd 15 minutes, for a total loss of 76 psi during 30 minute test. Bled back TBG to 200 psi, returned -1.5 bbls. Slickline in control of well upon LRS departure. 8/17/2019 1 FWHP's 200/vac/64 ris m Q �t J C Q Q 4) V � Eit Cl Q a N N M r }I L r Q C1 r Q N p Z a. LO o LL O N T 7 M t f \cc ¥ )k5 t f I O O w O m N N m W N m W b M W O w N N m r b n r W m O O m m W O W O m W m b P b N m m m p o 0 0 o c o 0 0 0 0 0 0 7 0 0 0 0 0 0 o a .� 00 ? o 00 m = ur > > u 80 b N U O O O O O O O O O O O O O O O O O O O O O r H O ❑ .- Z Z a 0 ` s q q � O O b b n W m T O O m m r N P Q N m pm O b N N b m N O N N W N m N w m P m C C a fb0 O (00 E N m W w W W m m W w m m W m W m m c a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T m E� g a n n n n n n r n n n n n r n n n n n r n r ❑W W y �i Y Y H� Q m N m m n m m P b n W N W b w m< 00 V N w m O m m W m et O M N O m m P m n m N m 1A n n m O O P N O b P IA P m w f0 m m m b m b m b b b m b m n r m m m m mN bN C O C m m b m m (O m m Nm Nmb Nmm NW m Nb mm Nm N mm mmN mmN mbN mfN0 mmN m w 2 N b b N b b o m b YI VI N b m m N N VI N 0 m C m m m' 9 Q m q O O O O O O O O O O O O N N N N N N o A w m U m U m W T A m E 7 7 7 K L m a Z u >❑ 0 J N O F f q O � r a m ❑ d EO N r f m w m W W P b m b m O m N w a V O N O O N O N P P N O r O W W P Q N N 3 O O O O O O O O O O O O O O IL d m C ❑ m ii M o0 0 00 $ 0 00 0 w m m m a m m m m 0 0 0 w w N N P NN Q N P N P N P N P N P N P N Q N PP N a P Q & P P P Q m E N w N W P b m n m m O_ --' --- m q d A � N Z ❑ ❑>> e U � F •.• m m m a 0 0 0 0 0 0 0 0 0 0 o a rn m m m 0 0 0 0 0 0 0 0 o O w m W W w w m w w O N t0+! a N (00 m 0 OI 0 o o W W N W m w P m m m m W n W m w m 0 F r m m N m O m b m N N m O N U O O m m Q Q m O m P r m P P b r O m U1 w O m P W fO h m W P m P N W VI m � a m o o N N m N ^ N m n N m o9 N m n N m N W N N O O m r a a' m a 3 E " Ea T m o o N N o n O m O m N n N m O N Cl o N N N n W o P o Q m N m W o P m N m m JQ p p o 0 0 0 0 0 0 0 0 0 0 o c 0 0 0 0 0 0 o E a < a L Om Z a - - - .-o O O o P o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o P E 0 n b ai o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 a 0 N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W N m m P m 0 m r W m o" q �n (o b � w n � .. Q x o q ❑� o n � O m m o E o va"m330 m f'n n d U O C T a a m E o° a a 0 m 0 3 9i 0y N O O N a P b m a O m m m N N m m M mN P O Q W m W m O N b P m N � N O N m n N m N N N W' Q n m P n n m m O N N m OI O f7 N P m IN Q m (V O 1� N Cl m N P N n m O N D N m P N m m n b m O N m P m n m m O 8 h h � � U J Q N m m O N N O Q m b N n m m O N P N O O O m N ON m P m Q p m N M N N N N N O N P m N m m fO Ol m N m W n N W N m N n m m N W N N n P n m W N {7 P m m n W Cl Q Cl m m O m m p O m N m O m N n O W n O m m m m �� N N N N O O O O W W W m m n d e n n n n n n n n n n n n n n n n n n n n n n n n n n n W h N O m N N N P m m N p N Q O N W N b O W m P n M m N N O V pN p V N 0 O N N m m N W n m p O^ O p W ry m C m b m m P m Q m m m n m n n n n n m m m N W m O fD O N N N V t C N N N N N N N N N N N N N N N N N N N m N C'1 m m m W C Y d m N W N m N W N m N W N m m W N W N W N W m W N N W W N W N W N W N m N m N W m W N W N W N W N W N W d -t Y] N N N m m m N N m N m m N N N N N N N N N N N N N N n m o O O^ m W P m m O W m m n o M m m m n^ Q O O N W W N n O O m Q O N m m P n P W N O N P VI 1� fO O Cl m n W O VI r 1� N O (O N n l7 0 Q N Cf V �O f� b N m m N N N N M M M b W � m N y Q m m Q W m W N n W n n O N W O Q l`m') n m N CJ m n qr � � W m N m b b m O' b � m m N N P Om r Q O O Y O P N m w m m w ao n W N m m< m Ct 01 N !l O W W n CI N Q Q P O P P N Q m Q P Q N P m Q n m m m W C7 ON ` N N Cl Q O N W N m m m n m W N O N l'f P q N N N N N N N N N (V N t7 CI N m N m m m t7 m N P Q P P Q Q d Z: a p » m m N m m m m O H m N W N N Q O W< O O W W W m m m n W N W m P N m W n OI Q O Q W m N W W W W W W W m n N N m P W N W m Q O N W P m N n W W W W m W m m W W W_ W O_ m m m N_ n Q_ m m_ N m_ m n_ N m W_ m W n O_ m P N_ M m_ P_ O N_ _ _ _ N N N N m N m N N O n n m O n O m O m N m N m O N m N N m N N Q N P n W W m m m O N N m P m W N n m W O O W O O O N P N N Q Q N N m m n m W W O O N m m N m m W W N N W m W m N N N N N N m m m N m O N m N n m m O N N N m m N n ' N N m N m m m N m m m W m P W m m n N Q O P N m N m O d C a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 a o 0 0 N 0 m 0 a 0 m 0 mm 0 n 0 m W 0 o 0 0 N 0 0 m a 0 m 0 m 0 n 0 m 0 m 0 o 0 0 ry 0 m 0 a 0 m 0 m o n q � � m 0 W W W W O N N m N n N I N n O O m n 0 Q n N Ol W Q N n O m W Q P O S Q N m Q Q N [7 m N O N M P, N N N n W N A m N W p N O W A N C'1 O n P � W n @ fO n ONi W0 N N N N N N N (y N W CI W Q Q Q Q Q P N N N N N N N W 9 m N N N n W Cl w N n n N m m A N N N n N Q w N m O N C Q SO J � O � O m n N b N N m n N m N Nn N O@ p N m a O n W O N m O m m Q N P m N N N N N m W @ P I� m n CI m n N m m Cl b m N N m m W m W b m W N m m P N m m O Cl pm O@ m N b O N m P O m N m N N W n N P W N C d O O O O O O O O O O O O O O O O O O O O O O O O O O O W ._. C M@ @ LQ N bm A n p W N O N m b m b m m O m m W O O N N w {'I @@ N N m b n t M loi N W N O! W OI w w w CI @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ Y N N N N N N N N N N N N N N N N N N N N N N N N N N W w w W W w w w W W W W W C) b Q P m N N O SO n W P N W O n m m m P P m W O m N N w P W O O N W N W m W b W W N N W O m N P n W N P n W N Q n W N W m O N N n W Cl N n W N W N W m W n n P N m O N O W P N m n w m w N W O n W A m m m W ^ N m N m Q W pp O N O N O N M O N O n W W W W O O N N N - P@- W m n F m m W W O O z 2 n N N@ m m n m N N W m t7 W m m @ N m P m Cl P m P m m m N N n m N N N m m m n m O N N f O N N m N n N m Q O m n m M N O m m y N O m n N w O m m Q Cl O m n m m m n m m O N Cl @ N N m n m W O O N w@ N m m @ Q @ P P Q N N N N N m N N m N m m m m m m m m m m m >O d F N f� N N m m N f m m n m N N � m n n m m C m m m e N M e m m e n n 0 f� m m m O m m e m n N m N m W C < n O m m n O r Cl Y P N A m O W N m O m m O N O m N h n m m W O N m@ P N m n m m m O N m m e N m n P P Q Q@ P N m N N N N N m N N N N m m m m m m m m m O r W 0 N O Yf ONl m 0 N T O ci m w m W m m N N ea m m m m m m m m m m W m m N m m a m m w NO N CI N N N N N w N n N n N N N w w O O w m n N m w m w n m � e E a ¢ ¢ c m o m 0 0 0 0 0 0 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ma 0 0 0 0 0 o O o 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 w o N m It N e n m w o N m Q N b A m W o ry m e o. a m m N d U d N i 3 0 v'1 IQ LM i N Q m N b O N m O W n W W n O m m W W n N Q N O O W m n b b O W N m N m N N m id m a of m n o ei vi m � e n d m vi m n ai c ro N n o Z Z u m m m W n n n n n m W m W W W W W W W00 O O O O❑ O W w j ❑ r r w w O O O O m O W W Q N m Q N m N Q n n m m m W n W W W O O N O O H O O VI f ry W CNG Q � p O m ti F 0 a N A m°rc 2 x C C (.J n t"1 r W N V V WW m n P U N P O lA W W N b W m W Q O n m W N N Cl P m E m m m o n b 0 0 0 0 0 o W om 0 o O W W W W W W W w m E m C n o 0 0 0 0 0 0 0 0 0 0 m 0 0 0 0 0 0 0 0 0 0 0 �• o W m W O � Q pp n P n N m N P m Q Q m O W n W n N Q m 0 n W W W m O N m d N N Q b n W O Np W V o m�l m b N N Obl OWl L a W n m m 0 p Q P L QmP Q Q N b b N b m m W m m b N O' W m b W W b W b co b W b W m W m W W W b W m W N W b W b W b W W b W W W W W W b W d O _ C N V N 9 C C d m W b m Q n m b m O O m W N O N Q W 0 0 O O O f' U d K T t] W d L d 2 _ 0 0 _ _ _ J F2 A. W O N n o m m m m ^b m N W N N W Q n W W O m W m n m N N m N n < m m W N W N Q W m W n N m n W m m m m W N P n W O N P m n m m O m N N N m N P_ m_ m_ m_ m_ m_ n_ n_ m_ 0 m W_ m_ _ `Z w N W o o N Q m m n w N n n N n Q m P Q m m Q m N O m n m W N N O W N O Q W n n O op m W' W O N O N W N m Q n W m m b n m P m N O M N N N m N N n N O Q t0 Q m � m m >❑ w F � 0 0 N Q m m n W N n n N n Q m Q Q mW m P m Ol O m n m N N N O W N O Y m n n O Nm W W W W O m n N m W m Q Q b l0 W N n m W O O m O W m N m N Q Cl P Q P ❑� > w m �o m r I m O O m N m N N N m O lA n m m m O n W W m m n O n m O O N b n b P O W Q m Q m n n W n m m O N N N N N Q Q m m b m W O O W W ��� fmJ Cm'1 M Oml tm'I N m m lA N N N m {m'I N m a m a m I O N m W m m m P N m Q W n Q W P n m W m m Q O Q Q Q N N N O O W W W m ^ m n ¢ N N N N N N N N N N N N N N N ry U u — y u E o 5 5 5 ¢ ¢ ¢ p E_ E E o m O O N m O O n m O m O O O O N O o'f O P O m O W O F O m O W O O O O n N f m O W O O n n n n n W m m W W 0 0 0 0 0 m W WT W O W y W d W d ❑ O C E w b rn T y_ Z U 6 N �i zi D N i W b Q N n b N W W W n n N n Q b b n W W O W Cl W W YI W w N w O N n W w W b n b W N N M O m t0 w W N n W O N b b O b b n$ W n n b W 0 O N Z Z O_ O O O O O _ N N N N N N N N N N CII N N N N N 00 � � b b N h N V1 U W n w b VI b n b b W b b P O b Q h m b Q M O W O � OU d W F O O m a 0 ¢ rc m q 2 N n N n p pV O N W W O w b m b N W N W O N W W 6 Q N N N N O W OPl Oml N 0 N N O N w m b P n n W Y W O W 1V n w N P n O W b w N Q 1O O N Q Q Q Q b W W n W n n P n m n n p b m n w w n b W b N W W m O N N b W W P n O W vI W YI P b P t'1 n W W W W b eJ O W N O O W P w N b n b n N Vl d m n m N W b M w N N W W b m n n P fp O b W W b P W N n W Q b N (O W O b N w N Q C d C P Q Q P P Q P O V Q P Q P V Q P Q P W W w e] o'f N N N i a G� N Yf N N N N N N N N N y Vj b m b N Yf w b N YI b N Z= b W b W b W GI w W m b W b w w W b w b w YI w b m b w b w b w b w m w b W b w w W b w N W m W b W N W w b b N N N N N N N N N N m b b b b w N b b w b b d p u m 9 C V 0 Q P ' W P O n N N W N N O N^ w N b b n W n b O b n b b n P O O N n b M n Q n W n O W d U d U d� O� T q N _ O m O w O P O N O W OI n W P cp 01 41 W .9 N b W F n 1� N n W n n W ID n 0 N w w m m W b ❑ OC J >O F `2 Z b OR C O Q W t7 N w W Q b W N VI fV w b b W P O w O O b N Q (O N n n w W O O b O O P b n w M 61 O Q N N N O b ry � w m W m r m n m Q fq b O n b w n m w W W w m p m W e- m m 1q n m N f0 b N b b n N m O N m O m O W n n m n N W n W O n W f0 b W m m P Q m M N b C. N N N N N N N N N N N N N N N N N N N N N N N N N m Z Z OI C O w W w n O W Y1 w O W O n w N P m m w N O W W m m N w n W N W P Q Q Q Q Q Q Q Q Q b N N N b Q Q w m Vl w W fO f0 W W m fp W w (O b b w w IG w w w m O � d W W fp n O W b fp O W O n W N Q b b (p N O W W N Q b m w n b W O m O W O n O W O b O b O b O b O n O b O W O W W O O W O O b w w w w w w n n n n n n n n n n n n n n n n � c0 W m m pl pl m pl Ol m m m m 0 !G pl m Ol m m 0 m 0 0 0 P W W w N b w O O W W W w w b w W O O N b O b N n W 1D b m W O W b n O N P Q w N n Q W w w n n n b b w w O N N l7 W Q P P Q W W Cl y Q � a m W 4 m W N N n') W f m f b Ip N CI w W m m b O n W m P ' n W N W W W W w W b w W n n P m W JQ m b N Y) W lel P W b W IU 1D N n OI n n m m w O W W W Cl W b m n W at W m W O W O W w W n b m b N V d V C t Y, Q a E d Y � O m N i O N y b d ap W N M W W O N n W W b n W M O f0 b O W O O N m O N n O O W 6 P P W W W w b W n n b m w W W W W O W$ W W W W W W W W W W W W W W W W W W W m W O O O p .. O _ LL W q O L d T j O E g d m 0 LL 0 c�a`ril3 3 o m o b VI n C) O b b m W n m ' b N N 0 P O m n Q QA O O P n n W N m pm O m m m Q..O b N m m N n p n P OI b N. N 1m N N N N N N N N N N N N N . N N N 10 N b 1b0 11 i0 m m b b b m m m m m m m m m m m m 0 m 0 b m m b m m N C m m m m m m 0 m m m m m 0 m m m m m m m m m m m m m >O m m F O O P n n W N m m m m m m 0 m m m N N n n P W P N W P W N N N m m P m n n n n n n n n n n n n n n n n n n n n n n n n n n n O C m m m m m m m m m m m m m m m m m m m m m m m m m m m z� 0 m m m P W m N P O m m m m m m m m W O m 0 0 0 W O Y W N O W W n Q N W O W m m n 0 P N m n P n N N N N N N N N N N N N 0 N N W 0 m m O m N m P Q n W m n P m O W O m b O m m W O O m W 0 0 m m NO O O O W W O 0 m m m m m m m m m m m m m m m m m m W` W W w w m m m m m m m m m m .o 0 m ui Na um b v m m m P iz W Q P O m Q n W m N m b n w m P O P n P O P 0 m n Q m m n P m O m n O O N O O C n N C) O O O O N O O O C O O O O O N N N m p n O m 0 w N b 0 Q n O m m 0 N m m M CI P P Q P m m m b b m n n n n m m m � v m d m 0 O P n N m w a N m n O b O m n N O P w N W m m w Cf w O P m n w w n m M m O w w o O n w o n m b m M O W m C m m P P m O O O O O Oi W w w w O N Ol N n Z Z n N 0 N 0 w N N M N m m Q w m m W m M n C) m W W O Q P N P m P W P P P N P m P n P W P O m 0 N 0 N m 0 Q X 0 YI N N O W 0 m b C) N w W m n b C O C N N b b b m b COm b 0 b 0 m 0 N O VI O m O W m Q w Q W Q w P w P w Q p O 7 O Q m Q m Q b b m m m m m N w N N N N m m b N b b m m N W N b b b p Z= W b w m W m m W m m w m w m b w w O m w rn w O m m w O O o O n n w o P m N P P m f P O m O n m m N m m w Q W W w w N m w m o o M o CJ w Q, o a m C y 0 Q O N N O 0 Q P b b Q b P O Q m N G Q m N N n Q Q Q Q W C d N N N N m m N n m m m m m n 0 d m Wp d e P n m m O b n Q N Q� �� A O yd. d (J P O n N m N 0 w N N n Q m � W Q m n Cl m W 0 C) m n W a a 0 O o CI C) n O 0 m b W N N Q N O b 0 n m O T A N h Q P Q Q N NI? (7 N N H ti N d a P F E 2 b x moo: Z Q P O m m N N m m Pm P O m N n m w 0 0 0 P P 0 N m 0 w > Yl m N (7 CO P N m w m b N n O m O P W O r O w m P P m U Y m r O N m 0 m M _ w W m i n m 0 m m W m N 0 N w m P Q N b_ m m_ O b m P_ 0 P m P_ Q Q_ N Q_ O Q_ 0 0 Cl_ n 0 m_ m_ Q W Cl W_ W 0_ N_ N N N N N N m p . N N N N N N N . ro e e. N e e e ro. N e. . N N . N N N . N . N . N . N O O O N N n n n n n m _ W c�a`ril3 3 o m o b VI n C) O b b m W n m ' b N N 0 P O m n Q QA O O P n n W N m pm O m m m Q..O b N m m N n p n P OI b N. N 1m N N N N N N N N N N N N N . N N N 10 N b 1b0 11 i0 m m b b b m m m m m m m m m m m m 0 m 0 b m m b m m N C m m m m m m 0 m m m m m 0 m m m m m m m m m m m m m >O m m F O O P n n W N m m m m m m 0 m m m N N n n P W P N W P W N N N m m P m n n n n n n n n n n n n n n n n n n n n n n n n n n n O C m m m m m m m m m m m m m m m m m m m m m m m m m m m z� 0 m m m P W m N P O m m m m m m m m W O m 0 0 0 W O Y W N O W W n Q N W O W m m n 0 P N m n P n N N N N N N N N N N N N 0 N N W 0 m m O m N m P Q n W m n P m O W O m b O m m W O O m W 0 0 m m NO O O O W W O 0 m m m m m m m m m m m m m m m m m m W` W W w w m m m m m m m m m m .o 0 m ui Na um b v m m m P iz W Q P O m Q n W m N m b n w m P O P n P O P 0 m n Q m m n P m O m n O O N O O C n N C) O O O O N O O O C O O O O O N N N m p n O m 0 w N b 0 Q n O m m 0 N m m M CI P P Q P m m m b b m n n n n m m m � v m d O N YI Cl n m 0 m m Q mQ 0 m m b O n N m W m w N n w m m n N O r m b Y Owl O r b 0 0 Q N 0 m 001 d .7 0 W m Q b Q O m 81 n N h N W Q w N n Q 0 0 Q X 0 YI N N O W 0 m b C) N w W m n b C O C N N b b b m b COm b 0 b 0 m 0 N O VI O m O W m Q w Q W Q w P w P w Q m Q O Q m Q m Q b b m m m m m N w N N N N m m b N b b m m b W N b b b p Z= W b w m W m m W m m w m w m b w w O m w rn w O m m w w w W W W W C d O U d C C y 0 Q O N N O 0 Q P b b Q b P O Q m N m N N n Q Q Q Q W C d N N N N m m N n m m m m m n 0 m m b P n m m O b n Q N Q� �� A O yd. d (J P O n N m N 0 w N N n Q m � W Q m n Cl m W 0 C) m n W OO Yf t� 0 VI CI C) n O 0 m b W N N Q N O b 0 n m O T A N h Q P Q Q N NI? (7 N N SV N d a F E 2 b N P b n 10 m N m 0 m O n . Q m w m N m 0 m 0 b O P w _ w W W O W S 0 n N N . O b m_ b b b_ b b_ Q N b_ m m_ O b m P_ 0 P m P_ Q Q_ N Q_ O Q_ 0 0 Cl_ n 0 m_ m_ Q W Cl W_ W 0_ N_ N N N N N N m p . N N N N N N N . N N . N N N N N N N N . N N . N N N . N . N . N . N . N Z J c�a`ril3 3 o m o b VI n C) O b b m W n m ' b N N 0 P O m n Q QA O O P n n W N m pm O m m m Q..O b N m m N n p n P OI b N. N 1m N N N N N N N N N N N N N . N N N 10 N b 1b0 11 i0 m m b b b m m m m m m m m m m m m 0 m 0 b m m b m m N C m m m m m m 0 m m m m m 0 m m m m m m m m m m m m m >O m m F O O P n n W N m m m m m m 0 m m m N N n n P W P N W P W N N N m m P m n n n n n n n n n n n n n n n n n n n n n n n n n n n O C m m m m m m m m m m m m m m m m m m m m m m m m m m m z� 0 m m m P W m N P O m m m m m m m m W O m 0 0 0 W O Y W N O W W n Q N W O W m m n 0 P N m n P n N N N N N N N N N N N N 0 N N W 0 m m O m N m P Q n W m n P m O W O m b O m m W O O m W 0 0 m m NO O O O W W O 0 m m m m m m m m m m m m m m m m m m W` W W w w m m m m m m m m m m .o 0 m ui Na um b v m m m P iz W Q P O m Q n W m N m b n w m P O P n P O P 0 m n Q m m n P m O m n O O N O O C n N C) O O O O N O O O C O O O O O N N N m p n O m 0 w N b 0 Q n O m m 0 N m m M CI P P Q P m m m b b m n n n n m m m � v m d n m A A n M Q m r m b m W n N A b N W m O N P b W n m N b �[ N N m m m m m p m m m m b A m W m O n A N A t7 A m r tp r A A m m fV m m Z Z _ _ _ _ O O t0 m b W N 0 O P m N W N b W n m N P r O m m Q r N N P N n N W O m N m n o Q r m O W n A m m W O a g d d r r O Z a - .� d d d W W A P N Q P n A b A Q Q W b m � r W m Q M m O N b N A r Q W 0 m O P n b O O m N W b W ¢ A m m n W m m ip rp, P P m W N0 O N OPi N A n O r t t U Y m m UI W N N m m W O Oi N N m O n Cl A N N r Y N O r N N G m^ m N N N fm3 m C N N m P m n N P P V m P O b N m b m m m fD yy N m b W m N r b r n r O m m W m W m m W P W A W T r n r r A A A A r n A r r r n r r r O r O r O r O r O r O r O r O r W W- `L 0 m 0 r m N N N N m � T l+l frp Q m M N N r m m W A m r 0 m O A P m A 0 O N ' O O m m O W IQ m n W' V m N N W{^p m m b m M N O W r m N Q N O m m A w m A P m el M N r d m r m m m m m w w m m m m n m m m m m m w m m m m w d p C C {dj d d O N N W W m Ol d P m m m m m W m OI m O O N m m A O w d U m m � N b W pp m W N P n O N m n O m m m P n W N l ydj T Z W O O � N Y m Nm O PWf O N m R w� vmi h O r b O O h W fp N m Ol O m O_ Q Cl W r b m �_ W p N N N N N N N N N N N N N N N N - - - - - - - - s - Z � O Q m W A m Cl O S O W � W � m Imo Oml m bp O m Np W P ONl 0 h N N N p t0 b ro 0 IPO IPO N 0 0 m m N m p0 t0 m A m N I m m m b m N N m m n m m m m m b b m m m m m. m m m w m. m n m m m m a m m m n m m m m 9 m m Ol m d F ` O m W A m m O O Q W A N m m m m W m O m m m Q N m m r A M1 m Oi O N N O O N C) Q N m P P m m m n n n n n n n n n n n n n n n n n n n n n n n n ^ FS � m ro m m m m m m m ro m ao m. m m m m m m m m m m. m m n o VI m P m O N m m n P O m N m a A m o m m O b m n m mm m m OI w N m r W e r O b m m P m m P P P P P P P m P N N N N N N Q a m m N P W N W N m n N P b n P O P Q m m M b m m g m r O m m N IN r N m P Q W m n m N m A m N m m r P 01 m m n m m m W w m m W m p e E A m o m m m m r a P m m m m b P m m m 0 m o e n Oo o o c o ry av o a7 0 0 0 0 0 0 0 0 0 0 o W W W O coi O b D w O N N m N P N n N O q m m m W m W N P Q v m P b P m n n o m m m m m w m W maiTi33o w - � A C .. i .. d U 000 O Q Y d L_ gO m Q N W m Q N O N N O A N W N' m N A A M m A W N Q N h N N N m A N pOp A W N O W W N p m (Qp W N W N W Q A mNR w N N Y 100 01 N O b O'^ tp b O N Q b m W m m W W W W W W O O O O O N N N N N O N M l'1 - - - - - - .- r N N N N N lV N N N N (V [V N N N N N N N d N Q N P W P W W W D P N' N O P m W N P N N O O A A N P W P N m W N m N O N W W A W N N N P N N (V N �l VI Oi pl Oi pi M tV l7 Ol t7 �C [V N P A r m x m � °1 0 J O N Q m W N m N N b O m N N W m m O N m N N N w m m O p m Q O Q m V A Q b b N N W m O N W O A N N Q N mQ N Q A O W w m N N w P n O l7 (O q O O O O O O O O O O O O O O O O O O O O O O O O O O w P w N O @ w N w O w N C! @ O O W m N@ N A O N A@ N O W T @ w Ni w@ O N w N A m O N m O w O A m O@@ C_ N P @ P P @ It It @ p@ p@ y@ @ Q @ @ w m w w Qm ym ym ym (ywyll Cwl CNJ L tl@ N Ip N N N N N N N YI N@ N @ N N N N V@I N N N N N h N Q" rn m m w w w w w w w W m m W m m w w W w w w w w w m w 2 V] N N N N N N N N N N N N N N N N N N N N N N N N N N W m O w O W A W P w P N A l7 O W m W W P pm O m N O A w N M Cl {7 O W m m A A A m w w N m N m< N N 0 N m O W (O W N N m O W w m N N m P A O W b 01 m m m W W O O O N N N N N W P P P P N N N b W � I Q m N O W m A A m N N Q Q Cl N N O O m m m m m - A A b b b m m O N W N A m A � W m O to O Q N CI m m Q A b N b N Q P Q m W N A W m@ A N N A m Q Q Q t0 N N m A A m m m b m m b b b A A A A A A A A A A A A A A A m m m t0 m m (O m m m m b m b m m m m m m m m m m m b b m m m m 0 m m m m b m CI m m m m 0 0 0 0 b m 0 m Oj of Cl 0 i p p NQ M N O N Q Q Q m W N A m W P O N N Q f0 N 0 0 A (G i(1 i(1 tG w N N 1� Ol N N N N N fV Cl N N N N N N N N ry N N (V w n (7 N N b W m m l7 17 w C] N A A A A A A A A A A A A h A A A A A A A A A A A A A o C m m m m m m m m m of m m m m m m m m m m m m m m m m m O N p O w m Q O m P O O m N N N Q N M Cl m N N A Q Q N w A O W P w w N m A w A w N N Q N N O m w w m W w A w O m m w N N N 0 0 0 0 0 0 0 0 0 0 o W m m m m m m w o w W w w m w NN W N wN ^ N N m m m A N Q N m A N N N m O N A A m w N A m N O N A Q A Q A O A CJ m Q W m N A A Ni O m W O m b A O W m O O W O m O m W W n' a n n M N n W e m a `D a WN n e0 v m m m m n O O O O O O O � O O O O p O O N O O O l7 O OI O O O w W O O O N N N N N w m Q Q Q N � tl N Z N n m a m d a U 6 N i i 0 N m m m O m n m m P m n O P n N n N n m O N P b m m m m m m W o m Cf m m V P P P m m m m m m d N N N N N N N N N N N N N m W v m o N m W n m P m N o 0 m m O m b n m O m O m m n m w w Q b m m N n b b b m m P P N O m N m m m Q n w N N m m C n O m� W' CbI ul w n m m m m w w o 0 0 0 C m m m m m ae oe m ai a m di w W O O O O O O O O O O O O O n n n n r n n r r r n n n n N Q O Q m W m Q m m N m m n W N m m Q O r Q r m w c b b m m n n n m W m o 0 c m m m m m m m m m m P P v C a v e 6 6 6 6 v a o Q v W m m m m m m m m m m m m d m m m m m m 2 m m m m m m . m m m m m m m m n m Q m m m w n w w w m m n m n n m Q m N N N N N N N O N n Q r Om m W m b r r n n m m m W W W W c> O f NO m W. m Q O O O p O O O O O y H m N N m b b r n n m m 0 0 dd p C N .N- �2 f = 6 v Z N A m b m m O P N w m m m m Np m m m Q m n m Q m 9 0 b m p m m m m m m m w m w m W m O n O r n r N n 35 N r r n n n n n m m m m m m r m n m n m m m m w m w m g n n r r n r m r m n v n e n vmi n m ' n p C z� ro ro m m m m rC m m m m m m n m o m n m m m n W m m m m m m m n n n n n m m W O N r m m N m m N W ;!C l N O O N W n W m b c> O f NO m W. m Q O O O p O O O O O y H m N N m b b r n n m m 0 0 dd p C N .N- �2 f = 6 v Z N A C) 0 LO c m Al U U CD O Q 5K0+ �� North America - ALASKA - BP PBU 11 11-11 11-11A 11-11A 500292138201 AOGCC Offset Well Report 31 July, 2019 by Company: North America -ALASKA -BP Project: PBU Reference Site: 11 Site Error: 0.00usft Reference Well: 11-11 Well Error: 0.0ousft Reference Wellbore 11-11A Reference Design: 11-11A BP Anticollision Report Local Coordinate Reference: TVD Reference: MO Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-11 Kelly Bushing / Rotary Table @ 58.00usft (DOYON 16) Kelly Bushing / Rotary Table @ 58.00usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference 11-11A Filter type: NO GLOBAL FILTER: Using user defined selection S filtering criteria Reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Data 7/31/2019 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,200.00 1: Schlumberger GCTmultishol(11-11) GCT -MS Schlumberger GCT multishot 9,232.00 12,881.00 Survey#1(11-11A) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 04 11 11-08-11-08-11-08 2,668.80 2,675.00 133.54 11-09-11-09-11-09 1,426.17 1,425.00 230.24 1"9 -11 -09A -11-09A 1,427.06 1,425.00 230.26 11-10- 11-10- 11-10 3,392.10 3,375.00 54.89 11-10-11-t0A-11-t0A 3,392.10 3,375.00 54.89 11-11 -11-11 -11-11 9,506.32 9,575.00 125.57 11-13 - 11-13 - 11-13 2,643.59 2,650.00 241.98 11 -13 - 11-13A- 11-13A 2,643.59 2,650.00 241.98 11-14- 11-14- 11-14 1,558.79 1,600.00 286.51 11-14-11-14PB1-11-14PB1 1,558.79 1,600.00 286.51 11-14-11-25-11-25 1,556.96 1,600.00 286.51 11 -14 -11 -25A -11-25A 1,556.96 1,600.00 286.51 11-23 - 11-23 - 11-23 551.28 550.00 174.13 11 -23 -11 -23A -11-23A 571.65 575.00 174.61 11-23 - 11-23B - 11-23B 558.71 575.00 174.29 11-23 - 11-23BPBI - 11-23BPB1 558.71 57500 174.29 11-26-11-28-11-26 3,041.98 3,200.00 402.34 11-27-11-27-11-27 3,038.59 3,150.00 220.55 11-28-11-28-11-28 1,250.80 1,275.00 89.80 11 -28 -11 -28A -11-28A 1,256.84 1,275.00 90.06 11 -28 -11 -28B -11-28B 1,256.84 1,275.00 90.06 11-33- 11-33- 11-33 1,394.38 1,400.00 36.50 11-35-11-35-11-35 2,615.79 2,625.00 401.97 11-36-11-36-11-36 1,690.49 1,725.00 473.50 Plan Lisburne - Plan Lisburne - Lisburne Wp 1.0 1,526.61 1,525.00 60.39 L3 1-3-31 - 13-31 - 13-31 9,686.47 11,150.00 384.13 7/31/2019 10.49'13AM Page 2 of COMPASS 5000.1 Build 81D N O L N q c� w a m K O S > n n c n _ gg Q U 9 y �2 a m w; E 0 O W Q J N ❑ W U a1N O K X❑ x p m Q m m m N W E LL 8 o 0 0 o a o E a _ a K o a a O O O o a o E ❑ O N m o d v D E N N C X C u nF m? a w E0 fi N E c o d E U .. c 'm 0 a C ❑'.Z d v y g a w o f O ~ all xLD a v y n c E U FL p U fn y o u a d N Q m n c r o N m m a u aE nW E = C C m D I U � v y a m u y '. C a n > Q � ❑ d a zc m E Y V% O a of m C m .0 W K m W W y d U a�J F E S �j Z' N aL ❑ ' Q 9 E s ti s O 0 t Ll E 0 N N K C W LD LL Qv T � ❑.Y D o ti y g � m a O n CL ❑ t0 �i N r Z > v S U y LL lV w m m K IQ O oC N w a E E'0 c c ~ H r 3 > > o Z w Z w w y Q Q U o p C7 w O O o z O p LL' J J d m W LL LL W 0 m p W; E LL y y y '. U Q Q O (a7 LL LL U W w O Z w Z W J » V U' Z z z w m o z Z w p w m D o � � ❑O z o o LL wm ¢❑¢I Y _ p a p C EZ N ry m W V Z ,YS ELL v p •E.• `. i Z 0 cE ycE O0 )a `aa a ?wiQce�° dE F U Q 6E E E c@ E v c m E E O E m U a W U m 0 U U d w m ❑ 0 0 0 00r❑ FL~Ey'-' f 2 (7 § §!y_z § ) . : _> }# - \ �!\§ \ ft k � 0 L •k �ƒ ;� k|\� \|.0 / c �# !� k(k \k ~ X22 § C2 - \ C, ° )!r) - - � E L�2� \|®|i% - 1 I -A i It— I (A Regg, James B (CED) Z(�DSJ From: Rixse, Melvin G (CED) Sent: Monday, July 22, 2019 7:12 PM To: Hyatt, Trevor Cc: AK, GWO Rig Nabors CDR2 Well Site Leader; Warren, Abigail M; Perl, John R; Sperry, Nathan; Thompson, Doug; Regg, James B (CED) Subject: PTD 219-056Re: 11-11A BOP Test Pressure Trevor, BPXA has AOGCC approval to test BOPE to 3500 psi on PBU 11-11A PTD219-056, (Rig CDR2) while operating under the permit to drill for the 11-11A sidetrack and the Sundry to mill the window. Please assure this approval email is available on the rig for AOGCC inspectors. Mei Rixse > On Jul 22, 2019, at 7:00 PM, Hyatt, Trevor <Trevor.Hyatt@bp. com> wrote: > Mel, > We just moved over to 11-11A for a CTD sidetrack. It was noticed that, in our approved sundry, it was marked to test the BOP to 4000 psi (at that time we were going to mill the window pre -rig). We were unable to mill the window pre -rig. Therefore, we are going to mill the window with CDR2. > The permit to drill states to test to the normal 3500 psi test pressure. > We would like clarification on the two test pressures and if we have approval to test the BOP to 3500 psi for milling the window and drilling? > Thanks for the help and see the attached approved sundry and permit to drill for reference. > Trevor Hyatt > BP Exploration (Alaska) > GWO— Drilling Engineer > Coil Tubing Drilling & Rig Workover > Trevor. Hyatt@bp.com<mailto:Trevor.Hyatt@bp.com> > Cell: 907-223-3087 > <11-11A Appr Permit 4-12-19.pdf> > <11-11 Appr Sundry 4-12-19.pdf> THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 11-11A BP Exploration (Alaska), Inc. Permit to Drill Number: 219-056 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.aIaska.gov Surface Location: 921' FSL, 328' FEL, SEC. 28, TI 1N, RI 5E, UM Bottomhole Location: 2698' FSL, 1681' FWL, SEC. 27, TI IN, RISE, UM Dear Mr. Mclaughlin: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, �p /'6 -- ssi4d e L.C Jhmielowski Commissioner DATED this 12 day of April, 2019. STATE OF ALASKA 111SKA OIL AND GAS CONSERVATION COMMISS' - PERMIT TO DRILL 20 AAC 25.005 RECEIVED 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if well is pro r Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development -Oil 0 'Service-Wnj ❑ Single Zone 0. Gas Redrill 0- Reentry [311ElCOalbed Exploratory - Oil Development - Gas ❑ Service - Supply Multiple Zone LH�C�}acC❑ Gecthe 2. Operator Name: 5. Bond Blanket 0 - Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 PBU 11-11A 3, Address: 6. Proposed Dept: 12. Field/Pool(s): P.O. Box 196612 Anchors a AK 99519-8612 MD: 12850' • TVD: 8685'ss • PRUDHOE BAY, PRUDHOE - 4a. Location of Well (Governmental Section):OIL 7. Property Designation (Lease Number): ADL 028325 Surface: 921' FSL, 326' FEL, Sec.28, T71N, R15E, UM S. DNR Approval Number: 13. Approximate spud date. Top of Productive Horizon: 3783' FSL, 1448' FEL, Sec. 28, T11 N ,R15E, UM 70-054 July 1, 2019 9. Acres In Property: 2560 14. Distance to Nearest Property: Total Depth: 2698' FSL, 1681' FVvt, Sec. 27, T11 N, R15E, UM 29706 ' 4b Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 58 - is 15. Distance to Nearest Well Open to Same Pool: Surface: x- 707198 ' y- 5952636 Zone - ASP 4 GL Elevation above MSL: 26.36 - feet 16. Deviated wells: Kickoff Depth: 9238 feet 17. Maximum Anticipated Pressures in prig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3419 - Surface: 2539 - 18. Casing Program: Specifications Top - Setting Dept - Bottom Cement Quantity, c.f. or sacks Hole Casino Weiqht Grade Coupling Length MD TVD MD I TVD (inciuding stage data) 4-1/4" 3-1/4"x2-7/8" 6.6#/6.5# 13Cr85 STL/FCII 4082' 8768' 7915'55 12850' 8685'55 278 sx Class'G' 19PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 9758 8911 9315 9315 8489 9577 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20' 370 sx PF II 32-112 32-112 Surface 2464 133x6- 2500 sx PF'E'. 400 sx PF'C'. 100 sx PF'C' 31 -2495 31-2495 Intermediate 9043 9.5/8' 500 sx Class'G', 300 sx PF'C' 29-9072 29-8259 Tieback Liner 8796 7' 157 sx LiteCrete. 806 sx Class'G' 27-8823 27-8025 Liner 937 7' 340sx Class'G' 8821-9758 8021-8911 Perforation Dept MD (ft): 9225-9634 Perforation Depth TVD (ft): 8404-8793 Hydraulic Fracture planned? Yes ❑ No 0 ' 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Dept Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements El 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Brownino. Zachary H from without prior written approval. Authorized Name Mclaughlin, Sean M Contact Email Zachary.Browning(Mbp.cem Authorized Title Engineering Team Lead - CTD Contact Phone +1 907 564 5220 Authorized Signature k Date S Commission Use DAN Permit to Drill T� - '7/ AN : 50- 029-21382-01-00 Permit Approval 1 See cover letter for other Number: Date' l requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbedmeth ne, gas hydrates, or bas contained in shales: Other: ©tIi el—Fstd'SrjQ\ Samples req d: Yes ❑ No Mud log req'd: Yes ❑ No Q H2S measures Yes No ❑ Directional svy req'd: Yes td/ No ❑ Y�TC I �C`� Q�_ Spacing exception req'd: Yes ❑ No � Inclination -only svy mq'd: Yes ❑ No �L �# � 1Y" Post initial injection MIT req'd: Yes ❑ No ❑ I6 -94o7 P65'I'OQS ,. APPROVED BY Approved by:13, COMMISSIONER THE COMMISSION Date: Form 10-401 Revised 5/2017 This permit is valid for 24 v 120 AAC 25.005 Submit Form n Duplicate G� (/ To: Alaska Oil & Gas Conservation Commission From: Zach Browning CTD Engineer Date: April 3, 2019 Re: 11-11A Permit to Drill Request 1�40b p Approval is requested for a permit to drill a CTD sidetrack lateral from well 11-11 with the Nabors CDR2 Coiled Tubing Drilling rig on or around July 1", 2019. Proposed plan for 11-11A: The sidetrack 11-11A will be a "3612' horizontal CST that will kick -out from the 11-11 parent in Zone 4. The CST will establish competitive offtake in the southern portion of the 11-08i waterflood pattern. The sidetrack will be drilled on or around July 1't, 2019. During pre -rig work it is proposed to set a 4-1/2" x 7" Delta whipstock at a kickoff depth of 9238' MD. It is planned to mill the 3.80" window+ 10' of rathole with service coil. The rig will move in, test BOPE and kill the well. The well will drill from Zone 4 to Zone 2 and then remain in Zone 2 for the duration. The proposed sidetrack will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner and cemented in place. The cased hole will be cleaned out, logged (GR/CCL/RPM) and selectively perforated. Pre -Rig Work (scheduled to begin May V, 2019) 1. SL Dummy GLMs. Drift for Whipstock 2. EL Set Delta Whipstock. 3. C Mill XN. Mill Window. 4. V Pre -CTD Tree work. Rig Work (scheduled to begin July 1", 2019) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2539 psi). 2. Drill production section: 4.25" OH, ^3612' (25 deg DLS build, 8 deg DLS lateral planned). 3. Run 3-1/4" x 2-7/8" 13Cr liner to TD. 4. Pump primary cement job: 57.5 bbis, 15.3 ppg Class G, TOC at TOL (`8768' MD)*. 5. Perform Cleanout/Logging run with GR/CCL/RPM. 6. Perforate Wellbore. 2" Millennium guns planned (^'1200', 6spf, planned). 7. Freeze protect well to a min 2,200' TVDss. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(1) Post -Rig Work: 1. V: Valve & tree work 2. SL/FB: PT Liner lap. Set LTP/PT LTP (if necessary). Set LGLVs 3. T: Portable TS flowback and well test (if perf 500' or more) Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (425 psi over -balance). Disposal: • All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must gotOGNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >31 must go to GNI. Hole Size: 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5k, STL, 13Cr solid liner: • 3-1/4", 6.6k, TCII, 13Cr solid liner: 9650' MD -12,850' MD 8768' MD -9650' MD • A planned 57.5 bbis of 15.3 ppg cement will be used for liner cementing (TOC = TOL at -8768' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (425 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 90% inclination at kickoff point is 18% • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property- 29,706' - • Distance to nearest well within pool - 620' - Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • GR/CCL/RPM cased hole logs will be run inside the production liner. Perforating: • Perforating: -1200' of perforations, 2', 60 deg random phasing, 6 spf, perf guns. • The primary barrier for this operation: a minimum EMW of 8.4 ppg (425 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: DS 11 is an H2S pad. Max recorded H2S reading on 11-11: 34 ppm on 11/16/18. Max H2S recorded on the pad: 825 ppm on 11-01 on 2/7/16. No planned fault crossings. Lost circulation risk is considered Low. . Reservoir Pressure: • The reservoir pressure on 11 -IIA is expected to be 3419 psi at 8800' TVDSS (7.47 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2539 psi. • Amin EMW of 8.4 ppg for this well will provide 425 psi over -balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joseph Lastufka 564-5220 TREE= 5X7 FMC 120 WEFU-EAD= GRAY GEN2 ACTUATOR = BAKERC OKB. AE/ = 59 BF. HEV = LATCHIFOFZTI KOP= 2800' Max Angle = 37" @ 5900' Datum MD= 9701' Datum ND= 88001 SS Minimum ID = 3.725" @ 8787' 4-1/2" HES XN NIPPLE bpf, D = 1958 - ID = 6.276' 1 O 7'LNR PERFORATION SUN"RY REF LOG: BFCS ON 07/08M ANGLE AT TOP PERF: 18" Q 9225' Note: Refer to Production DB for taskincal pert data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 2' 6 9225-9235 O 05/01/17 2' 6 9484- 9490 C 1226/16 2-7/8' 6 9532-9552 S 04/07/14 08126/15 3-1/8' 0 9568-9588 S 08/15/04 10115/89 3-3/8' 6 9568-9588 S =15/04 0826/15 3-3/8' 6 9570-9588 C 1024/15 33/8' 6 9602- 9634 S 02/08/86 08/26/15 33/8' 6 9602-9634 C 1024/15 33/8' 6 9604-9614 S 02/03/95 08,126/15 33/8" 6 9614- 9632 S 0123195 08"26/15 3318' 6 9640-9650 S 02/08186 0826/15 UADE2 REAMED CEA63,li (10103/15) 9669' C (PBTD WAS 9717) 7- LNR, 29ff, L-80, .0371 bpf, D = 6.184' 9758' 11-11 [SAFL JOINTTO1.3318' SG IS6BOIK12" CHROME 55WITH ST RATE OF 3450 PSI 2 - FES X W. D=3.8 GAS LFT MANDRELS ST MD I TVO I DEV I TYPE VLV LATCHIFOFZTI RWO DATE 6 3547 3516 25 KBG2 DOW BK 16 1223/18 5 5458 5126 35 KBG2 SO 8K 20 1223/18 4 6408 58971 35 1 KBG2 DMY BK 0 0820114 3 7229 658331 KBG2 OMY BK 0 05/16106 2 8008 7276 25 KBG2 DW BK 0 05/16/06 1 8620 7835 22 KBG2 DMY BK 0 1223/18 8727' 1-17- X 412' BKR S3 PKR. D = 3.870' 8787' 1-1412' FES XN NE, D= 3.725' BMD TT NOT LOGGED 8821' 9-5/8• X 7- PKR 8 TEBAC -967T FISH PILLED E -LIC TOOLSTRNJG (-23') BUT LET PART OF MEZVVHLS EXPANDING ]ADAPTOR SETTING TOOL 8 HEX F LUG (5/15/1 DATE REV BY COAMBJTS DATE REV BY COWAENrS 07111185 ORIGINAL COMPLETION 11106121117 tNVXW1 SET NTENVE.L HEX RUG (06111/17) 10124189 RWO 01/03/18 GJB/ CAM CIO (12123118) 05/17106 D16 RIND 11 0522/17 MS/JAD ADPE2FS 8 SET HEX RUG 8 TOOL STRING 0522117 GJB/JkC SET FISH ADAPTOR TOOL 8 REX FLOG 0523117 BTNJMD WKW1ID ADPERF OEPTHS(OS/01/17) PRUDHOE BAY UNIT WELL 11-11 PHRMT No: '1851410 AH No: 50-029-21382-00 T11 K R15H 921' FSL 8 328'FEL BP Exploration (Alaska) TREE= VYBLHEAD= GRAY GEN 2 ACfUATDR= OKE. ELEV = 58' BF.EEV= KOP= 2800' Max Angle = _° Datum MD= Datum TVD= 8800'SS PROPOSED REV 1 12-347" H 2495' Minimum ID = " @ D = 3.958" 1 8768' 1 )=6.276' N 8818- W7- LNR 8821' 4-12' X T DELTA WHIPSTOCK (_! / ) '.. 9233' 7' LNR 298, LA0, .0371 bpf, D =6.184" 3-1/4' LNR, 6.6#, L-80 TC11, .0079 bpf, W:-- 2.85" PERFORATION SUMMARY REF LOGON _/ I ANGLEATTOP PERF:_ Note: Refer to Production M for historical Derf data PBTD — I2-7/8" LNR 6.511, 13 -CR STL, .0058 bpf, ID = 2 441" I� _ I ORK;INAL COMPLETION 03f06/19j _JM) !, BULT PROPOSE) 03/06119 Z iMb I BUILT PROPOSED REV 1 0 ON 209T—4-1/2'fESX W. D=3.813" GAS LIFT MANDRELS ST M) SAFET )TES: ***4-12' CHROME 11-11 I TYPE IS S' CSG 8#IK55 WITH BURST RATE OF3450 PSI 1 8768' 1 )=6.276' N 8818- W7- LNR 8821' 4-12' X T DELTA WHIPSTOCK (_! / ) '.. 9233' 7' LNR 298, LA0, .0371 bpf, D =6.184" 3-1/4' LNR, 6.6#, L-80 TC11, .0079 bpf, W:-- 2.85" PERFORATION SUMMARY REF LOGON _/ I ANGLEATTOP PERF:_ Note: Refer to Production M for historical Derf data PBTD — I2-7/8" LNR 6.511, 13 -CR STL, .0058 bpf, ID = 2 441" I� _ I ORK;INAL COMPLETION 03f06/19j _JM) !, BULT PROPOSE) 03/06119 Z iMb I BUILT PROPOSED REV 1 0 ON 209T—4-1/2'fESX W. D=3.813" GAS LIFT MANDRELS ST M) I TVD I DEV I TYPE VLV LATCH PORT DOTE 6 3547 3516 25 KBG2 DONE BK 16 1223/18 5 5458 5126 35 KBG2 SO BK 20 1223/18 4 6408 5897 35 KBG2 DMY BK 0 06/20/14 3 7229 6583 37 KBG2 Dk4Y BK 0 05/16/06 2 8008 7276 25 KBG2 DW BK 0 05/16/06 1 8620 7835 22 KBG2 DW BK 0 1223/18 1/2" HES X NP, D=3.813' 1 X 4-12' BKR S-3 PKR D = 3.870" -1_8 788' —j 4-12" HES X NP, D = 3.813" a76e 3.70" DEPLOY SLV, D =3.00' 3-12" HES X NP, D = 2.813' 8787 -� 4-12" HES XN NP MLLED TO 3.80" (_/_/—) 3-12"X3-114'XO.D=2786" 8800' �4-12"VYLED, D=3.958' ELW Tr NOT LOGG® 8821' H 9-58" X 7" PKR 8 TIEBACK MILLOUT WINDOW (11-11 A)9238'-9248' 60' -� 3-114" X 2-78" XO, D = 2.377' PRUDHOE BAY Wr WHl 11 -IIA PERMITND: API No: 5D-029-21382-01 SEC 28, T1 1N, R1 SE, 921' FSL 8 328' FEL BP Exploration (Alaska) all Y Q O J Q a a) L Co � Q a •= ' O U •C a Z a � � � a m 0 N CL w 0 z3 z 3: c d J 9 N � c dw w a m c o y J J (� d > d � O D m V N r m � m ew r d o v 0 n Q H 2 J J U i 0 W 7 > > 9 s i d J 9 y � D c dw w a m c o y J J (� d > d � O D m V r W m r d H 2 J J U 0 W 7 > > 9 s m i 0 r 45 m 45 0 0 O O 0 O c_ m V m H 2 i d c ¢ ¢ f 2 0 ` d o O m LL d a c a ', h NLL6 i i d m i 0 r t c_ c i d c u C ` d o O LL d a c ', h NLL6 i i d i f m i 0 r a O n O O O O N n b m N N O m m O n O O O N N m m W Q 3 O u m > wE 8 � ~ O N V mry N Z m !� N m b m b b b N N N Y] N N O a p !9 p f O > = r � o @ m � = m d O m O N N N N N N N N N N O N O n n n n n n n n n n y v v c w O 3�rF-�p W n � N eNJ CWJ N ONi Cmt n Q YNI W m m N N Q Q Q O N N Q N b y o c m m m a m m Om1 to 0 o O o � Op W t y N O O O O O O O O O O O O O � f w S c e o b C V y� O Q m N N m O m O p O W 10 d n N N n Q m m N n N O d` jy •A N N Q Q m m p b N W W m O K d pL u ad E c_ a e e e e v v a s a a s d Q C L i�F N N N N N N N N N N N N N > O U a N N N N N N N N N N N N N F f z N O N w W w m m m m m m m m m N 2 U N N N N N N N N N N N N E N y� � y N r ^ ^ n N N m O b N N Q O O O w 2 x 0 o N m n N m o M N N N N N N N N N N N N N N N Z b w a � 2 � O ~ o o m m o o N o o m o (V 0 h m tp 0 0 0 h Oi N Q N b m cl m tm'f Q Q P Q N N N N m w E F' U 4 e m m voWi m m o m m m 0 021 a o d w n o a � j Qm W Y n d U a _ 2 N a Q N Q C) N N O W O N 0 N b (O Q d ! m W W M m b n r N Q Q Q N O O v a t -o a ry m c E � � m ni a a a zo m E m o 0 0 0 o N 10. o m 0 O O T O m m m N m O W O p n m O r n LL � N d O m N m ♦ W O N n O n W O O N N N N N m m J m J Q Q, y -a e H °i O ,� of 1 ai a0 of ai Z ai of of V' of 06 W = 'n C G F C O U 6 N �i Ti O N 6 vi1 R OO O n O ^ N O m N O Q m nn w O N N n O N O O Ol N m n w N m n YI n Q N n O O Q: Q• 0 b b b b m Opi pw p w O O O b m N m mP m m 1Q0 N m w t0 0 ,D m 0 0 0 0 N C m m oC m rD m m m m m m m m m m m m oC W >O d F � a m m Q m w m m o N o N w Q o O w W n W m W o N W Q m Q N Q o O n W g m rn T d P P n W o O n N W W m 0 0 m m m w w w w Ol m� w W OI � N_ N m m n W W W a N m Q Q N N m n n O � " C� S W a W m OI Oi Oi 01 O O o C O O o 0 0 o O O O r ¢ � m � r ui n a di w m 0 O w m n w W n N N O m N Q N w m m P N m w W n E .o nj d c N N n N P N N N W�pp Op w P N P N w O t°J a` iii33 o a Y O Y pm N V N � O � p wmm pw 2 tm+l t+l W w m� n m ImO� N YN�1 q m m o m z 2 O r � > d a d w 2 Q n n n o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d O n n N N Q N w W O O m m w m m O m m n N Q w n N W N m N Q N m m N P lV V N IA (V O Oi O N O N n m N O O Oi O [V C w N N m M Om m O m O m O m O m O O O O O O O O O O O O O rc d o a d u a V ty O A m n N m N W Q m N m N m N Q W Q m Q N N N N N N N N N N N w N W N w N w w 10 w W N N W w N N N N N N N N N N N N N N N N N m N N m N N O m O W O m m Q N w O N m O w W wN O] N W m r n N N O pnp i mp O O N OP'1 Oi � IL n 1N0 m N N p F O U co m m m m n m n n a N w m N m m N o m m N P N N O m m n N Q m O n m N m m N w m Q W m n m N W n N y O Q N m n m n O O m n N f w Q n n W h n n n m m m N N N N Q Q Q m m m N N N C N N N N N N N N N N N N N N N N N N N N 2 j OO O n O ^ N O m N O Q m nn w O N N n O N O O Ol N m n w N m n YI n Q N n O O Q: Q• 0 b b b b m Opi pw p w O O O b m N m mP m m 1Q0 N m w t0 0 ,D m 0 0 0 0 N C m m oC m rD m m m m m m m m m m m m oC W >O d F � a o n m N n 0 o N W W W Np 0 0 N W N w w N 0 0 0 0 0 0 0 0 T d P P n W o O n N p c 0 di o 0 0 0 o 0 ai o O D O o O m o O m W o O o O ai � N_ N m m n W W W a N m Q Q N N m n n C� S W a W m OI Oi Oi 01 O O o C O O o 0 0 o O O ¢ � m � r ui n a di w m of m w m w m ai m m m di m di ai m m m ai m m a m of m a m of di m m — E .o nj d c c t°J a` iii33 o a c o m z a i u o n m m o o m 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T d P P n W o O n N o 0 c 0 di o 0 0 0 o 0 ai o O D O o O m o O m W o O o O ai � N_ N m m n W W W O N m Q Q N N m n n C� S W a W Oi OI Oi Oi 01 O O o C O O o 0 0 o O O 01 E .o nj d c t°J a` iii33 o a a i u m N i m r O m m m n r N m m m w w P o P m r m fn m P m m Q m w m O m Q m P p m r O O N n m m O m N m m P N P O N m N n w m m N O m O m O O O w m m O W W W O O O O m Q Q m N O O W n m m N O W W W W m m m O O O O O O O O O O O W w W O W m m m m m m m w W W W m m m m m m w m m m m m m m m n r m w m m m m W m w m m m a o? z m ,n m m Wa Ifl m m m m w m m m. m m m m m F m m m m a � J � N O O O p O O O O O m r O m m m n r N m m m w w P o P m r m fn m P m m Q m w m O m Q m P p m r O O N n m m O m N m m P N P O N m N n w m m N O m O m O O O O O O O O O O O O O O O O O O O O O O m N O O O O O O O O O O O O O O O O O O O O O O O m m m m m m m m m m m m m m m m m m m m m m m n r m w m m m m W m w m m m a o? z m ,n m m Wa Ifl m m m m w m m m. m m m m m m m m m m a � J � N O O O p O O O O O O O O O O H W r 0 = m O r Q Q m m O AC ma n n n n n n n r n n n n n O n n O n N mN O W N H r W m W W n W m N N m N W m O N m O w N m m m O W n O N m Q m m N r w O Q m w r m O n N m O N r Q r m W N M w m m W O N r N C W Q N O N n N O W Q N N M-4 m W n r m w m m m m W m w m m m a o? z m ,n m m N Ifl m m m m w m m m. m m m m m m m m m m N N O O O p O O O O O O O O O O H W r O m O r Q Q m m O AC ma n n n n n n n r n n n n n O n n O n O n n O n O n O n O n O n W W W m W N m O n t0 O m W O N W m m n w m n w m Q r W W N A O m n N r N m N Cl n W m W m w f m m m m m w O W m W m m P W m m W m m w W y W m Q m W m W f0 N N m m m Ip fp m m m f0 M-4 m. m m m m w m m m m W m w m m m a o? z m ,n m m N Ifl m m m m w m m m. m m m m m m m m m m N m m n Q O n O m m W m W m Q m m m m N O m m m H W r m Q m O r Q Q m m O m W m m W b N W m N O m w m m Q N m m W P m n N m m C n N O m m 0 m m m m W m m O N m N m N N m w P m Q O m Q W W m W N m O n t0 O m W O N W m m n w m n w m Q r W W w 2 m Q M O O N n m W r w O W m n m P O N V W Q O Cl m O Q tC m VI n n N Ci m 0 a m N w N N Oi w m Q w m 0 m N N O O O O W W m m m n n n n n n n r n n - - - - - - - - - - - Z 0 N A O m O N n r N r N W N W N V W m N rW O W m w f N m m P N m n N O N (7 m W m p N p m N m N N m m m m m m m m m m m N m m (p m n m W m m N m m b N b n W m m tp W m f0 m f0 f0 m W W W m Ip fp m m 1O f0 f0 10 m. m m W m W m m m m m m m W of [O m m m m m m m m m m m N m m m m >m e� m W W W m N W O O O O O N m W W n W W m O OP _ N N N t0 O m W O N W m m n w m n w m Q r W W N m N n N n O O O O O M N N m (p O o o G O o 0 0 0 m n m N m m m m m m O O O O O m m Q N O . N Q m m of bi m ai ai m ai o o d o o m m m of rn ti m m m m m m m m m m m m W W m w W m m m m m m m m m m m e� O a o 0 0 o 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 o O O O 0 o 0 0 0 O 0 o 0 0 0 0 0 0 o O d O o o G O o 0 0 0 O m O O O 0 0 0 0 O 0 O 0 O o m n O O O o O N o Q m w O O N m w_ Q m m m n m W O N N N Q m m r' it c S d O C d' b L OI 0 O d d y d C N Uo` H33 o a D ro 3 3 o m vNi m m m o w m of m D m m m m w z OI m 0 U, m O O F � C O O O m M N M m n Q m m U m U Z Z N N a n n m N m �Op m 0 a r a m m '— a u"i O Z m > io qin m a J O O O 0 o V x 2 n o 0 0 0 0 Q m m m o m m 8 m a P n o m v o0 8 m m Pm m Y n m� N •= mm ¢ i � y c 0 0 0 n n n n n n n n O 10 0 n m N � j Q W W P M N 0 O O M N N M m Q m P N O O P S m h N N m O n r Cl Vl CI U 0 y O C t d" m C rn O O m O O L+ � t N N N m Ifl N m m M O O O O — Z � c w m n Cl N m^ l't m P 5 a O O m N Q m O O N O N m O m m m m w m z m m m m N? m n q N. nW � 0 o 0 ry m D V U N V m VI r O d w ry P m N N Q o N n e� o w N o m m Q m m ,m` m m e ae m o m m� n vi of n n W o_ . K L m d $ m> o C 2 3 H C a Y 0 Q^ N Q v n$ p Q Z= F f Z N O os N m O1 m m O Z N m m m r r Z Z O O N S O O S O O O O O O O m O m m m m m m mm m w m m m N N N N YI N m m e m N m, N N O � F N m m O CL N m m m m m w 2 m o O a� o� 92 U o� oY o O IL m 9 m v N m m O Q N YmI m r N m Oi a n n n n n m N N m 46 f c m Z O o m o 0om o m 6. o � o � m P r O N y m m m m m m m m m m C O SI P L � z— N N n o N a m c m W m n r u u Q � � w m v ¢ o iA cc o n s e m ¢N m m m m m a° a° a° p V r g6 z¢ t na na na o v d L m C ¢ ¢ a E 3 ¢ ¢ ¢ zO m o o O Q o o m f2 2 D o v o voi e m w D ro 3 3 3 D m r N OI m 0 U, N O � O U z Z Z n a e a u"i io io qin J O O O n n r o m m m m o m m 8 m a P n o m v o0 8 m m Pm n m� N o r 0 0 0 n n n n n n n n OI o n 10 0 n m N � W N N M m Q m P N O O P S m h N N m m O n Qm p p p p N N N C t d" P mm m VI m N Vl m m m OI m W m Q N N m L+ � m N N N m Ifl N m m m m Z mO m n Cl N m^ l't m P ID O O m N Q m O O N O N m O m m m m m z m m m m N? m n q N. nW � 0 o 0 ry m ow o N n e� o w N o m m Q m m a e m e ae m o m m� n vi of n n W o_ ,o H C O H Y 0 Q^ N Q v n$ b w Z= N r N O R Z O N N m r Z Z O N S O O S O O O O O O O m O m m m m m m mm m n m n m m m N N N N YI N m m e m N m, mo O � F N r N m m m m m o a� o� 92 o� oY o O 9 m O n N m Oi a di N m N N m c m o o m o 0om o m 6. o � o � SI P L c c u u � � w v o iA cc c c c cvi w amo a° a° a° r m'o r g6 z¢ t na na na v d L m ¢ ¢ a m C 9 y O L w d a L O O a � p E E c 2 q C V m O i y L q 3 m m U u m K r q rc d a 5 Q Em N E 2 S S U m O E >a Q ? m E m z h 0 1 i a L a N a o m 3 m m a 5 Q 3 a S S E >a Q ? y o 0 J ry N N 0 Q Q m O O O m N �d CL i C ® 0 m Q O N 0 o. 0 T C O Q C S m B rn Q L W t°�ay33o a 0 0 0 m C N E a m E a o w m n� a o m N o� vwi m m o o ry N W7 7 7 7 N N f C D O O V � O O w w N N fO N n r f0 P O N O f� r n N n n tD N O P th N r of � W 0 O fp C 0 O O r r P 0 N w P n O N N t'f N n P O N n P O r l7 N n J w� W 0 w 0 n t0 VI P w N O 0 n n n f � P O W P O N N n P n ro w 0 N r m _ O l7 O r r IW N O N N w O L N Ol r (O at of 0 w O O VI N N 0 N U y"' m Vl A P P P P N N Yf N N t0 b w r d N m.6.6.6 m W m m m m m m �o= a o0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m o 0 0 0 0 0 0 0 0 0 0 0 L O m N mw N 0 (O Ot m at Q! 0 at n p N N by North America - ALASKA - BP PBU 11 11-11 11-11A 11-11A WP04 Anticollision Summary Report 05 April, 2019 Lip Company: North America - ALASKA - BP Project: PBU Reference Site: 11 Site Error: 0.00usft Reference Well: 11-11 Well Error: 0,00usft Reference Wellbore 11-11A Reference Design: 11-11A WP04 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-11 Mean Sea Level Kelly Bushing / Rotary Table @ 58.00usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum reference 11-11A WP04 Centre to ilter type: NO GLOBAL FILTER. Using user defined selection 8 filtering criteria rterpolation Method: MD Interval 25.00usft Error Model: ISCWSA lepth Range: 9,200.00 to 12,850.00usft Scan Method: Tray. Cylinder North results Limited by: Maximum center -center distance of 1,481.30usft Error Surface: Elliptical Conic Survey Tool Program Date 4/5/2019 — From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 9,200.00 1Schlumberger GCTmultishot(11-11) GCT -MS Schlumberger GCT multishot 9,200.00 12,850.00 11-11A WP04(11-11 A) MWD MWD - Standard Summary Site Name Offset Well - Wellbore - Design 04 04-05 - 04-05 - 04-05 04-05 - 04-05A - 04-05A 11 11-08 - 11-08 - 11-08 11-09 - 11-09 - 11-09 11-09 - 11-09A - 11-09A 11-10 - 11-10 - 11-10 11-10 - 11-10A - 11-10A 11-11 - 11-11 - 11-11 11-13 - 11-13 - 11-13 11-13 - 11-13A - 11-13A 11-14 - 11-14 - 11-14 11-14 - 11-14PB1 - 11-14PB1 11-14 - 11-25 - 11-25 11-14 - 11-25A- 11-25A 11-23 - 11-23 - 11-23 11-23 - 11-23A - 11-23A 11-23 - 11-23B - 11-23B 11-23 - 11-23BPB1 - 11-236PBI 11-26 - 11-26 - 11-26 11-27 - 11-27 - 11-27 11-28 - 11-28 - 11-28 11-28 - 11-28A - 11-2BA 11-28 - 11-288 - 11-28B 11-31 - 11-31 - 11-31 11-32 - 11-32A- 11-32A 11-33 - 11-33 - 11-33 11-35 - 11-35 - 11-35 11-36 - 11-36 - 11-36 Plan Lisburne - Plan Lisburne - Lisburne Wp 1.0 L3 L3-31 - 13-31 - 13-31 1331 - 1.3-31 PBI - 1.3-31 PBI Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 12,763.02 10,137.00 1,443.89 424.18 1,019.69 Pass - Major Risk 12,810.75 10,294.00 999.51 356.60 643.57 Pass - Major Risk 12,450.00 9,775.00 1,357.93 423.69 941.84 Pass - Major Risk Out of range Out of range Out of range Out of range 9,500.00 9,625.00 195.28 14.37 181.86 No Error Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 9,388.53 12,850.00 768.32 292.24 636.87 Pass - Major Risk Out of range 10,691.93 9,400.00 568.78 159.54 410.74 Pass - Major Risk Out of range Out of range 9,625.00 11,200.00 9,511.42 10,737.00 462.39 155.02 309.11 Pass - Major Risk 650.24 173.11 493.61 Pass- Major Risk 4/52019 9:2T23AM Page 2 of 3 COMPASS 5000 1 Build 810 Company: North America - ALASKA - BP Project: PBU Reference Site: 11 Site Error: 0,00usft Reference Well: 11-11 Well Error: 0.00usft Reference Wellbore 11-11A Reference Design: 11-11A WP04 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset NO Reference: Well 11-11 Mean Sea Level Kelly Bushing / Rotary Table @ 58.00usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to Kelly Bushing / Rotary Table @ Coordinates are relative to: 11-11 Jffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK ventral Meridian is 150° 0' 0.000 W' Grid Convergence at Surface is: 1.58° Ladder Plot 1600 -- -- - -- - - -- } ------- 0 ; I 31zoo o i i to to rz C/o 800- LD 00 L - -- Q `w --- 400- 0 00 0 0 2500 5000 7500 10000 12500 15000 Measured Depth (2500 us♦Un) 11-08,11-08,11-08V1 -Ar 11-28,11-28,11-28Vl -X- 0405,04-05,04-05Vl 11-09,11-09A, 11-09A V2 f 11-28,11-28B, 11-28B V0 43- 11-32,11-32A, 11-32A V0 11-09,11-09,11-09V1 $ 11-28,11-28A, 11-28AV10 $ 11-14,11-14,11-14V1 11-10,11-10,11-10V1 $ 11-31,11-31,11-31 V1 -♦ 11-14,11-14PB1, 11-14PB1 V1 11-10,11-10A, 11-10A V0 $ 111'6,11-36,11-36V1 11-14,11-25A, 11-25AV4 11-11,11-11,11-11 V1 -k- 13-31,13-31,13-31 V1 -9111r- 11-14,11-25,11-25Vl 11-23,11-23BPB1, 11-23BPB1 V0 -Ar- 1331, 1331 P81, 1-331 Pat VU -$- 11-13,11-13A, 11-13AV3 11-23,11-23A, 11-23A V1 4*- 11-33,11-33,11-33Vl $ 11-13,11-13,11-13Vl 11-23,11-23B, 11-23B V0 -d- 11-26,11-26,11-26V1 $ 11-35,11-35,11-35V1 4/5@019 9:2723AM Page 3 of 3 COMPASS 5000.1 Build 810 § !§ ; | 9G| � ,a„;„...... ©//----^^^2 ! } / :- 2 / }\ ! §(ui/ t / / / / / a t \]! |E ! @@! §)h\ . ;Am§ (\{ , | §o LL- p9l: � \ }§( i i ; ; i H;i,'-!!)(I !R§§leeR�g ee;Ee§§R 29;§§77 ! ( ! !. \ ( y�! � by North America - ALASKA - BP PBU 11 11-11 11-11A 11-11A WP04 Plus 50011 MD AOGCC Offset Well Report 05 April, 2019 Company: North America -ALASKA- BP Project: PBU Reference Site: 11 Site Error: 0 oousft Reference Well: 11-11 Well Error: 0,00usft Reference Wellbore 11-11A Reference Design: 11-11A WP04 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-11 Mean Sea Level Kelly Bushing / Rotary Table @ 58.00usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 11.11A WP04 Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Centre to Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.O0usft Error Surface: Elliptical Conic Survey Tool Program Date 4/5/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 10000 9,200.00 1 Schlumberger GCT multishot (11-11) GCT -MS Schlumberger GCT multishot 9200.00 13,350.00 11-11 A WP04 Plus 500ft MD(11-11 A) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 04 11 11-08 - 11-08 - 11-08 2,668.80 2,675.00 133.54 11-10-11-10-11-10 3,392.10 3,375.00 54.88 11 -10 -11 -10A -11-10A 3,392.10 3,375.00 54.88 11-11 - 11-11 - 11-11 9,500.00 9,625.00 195.28 11-11 - 11.11A- 11-11A WP04 12,850.00 12,850.00 0.00 11-23-11-23-11-23 551.28 550.00 174.13 11-23 - 11-23A- 11-23A 571.65 575.00 174.61 11-23 - 11-23B - 11-238 558.71 575.00 174.29 11-23 - 11-23BPB1 - 11-23BPB1 558.71 575.00 174.29 11-28-11-28-11-28 1,250.60 1,275.00 89.80 11 -28 -11 -28A -11-28A 1,256.84 1,275.00 90.06 11 -28 -11 -28B -11-28B 1,256.84 1,275.00 90.06 11-33-11-33 - 11-33 1,394.38 1,400.00 36.50 Plan Lisburne- Plan Lisburne - Lisburne Wp 1.0 1,526.61 1,525.00 60.39 L3 4/52019 10:41:27AM Page 2 of 2 COMPASS 5000.1 Build 81D Well BighDie Quick Test Sub to Otis Top of 7" Otis Distances from top of riser Excluding quick -test sub Top of Annular CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 --- ---- o�l.—._._._ _._._._ _ 4 Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears CL 2-318" Pipe/Slips 10.1 ft 81 Kill Line CL 2-3/8" x 3.112 VBRs CL 2-3/8" Pipe/Slips 13.4 ft Riga Dnp Pan 7-1116' 51, Flange x T' Chis Bos dril 7 1116" Annular CL of Top Swab 16.0 k �-- Swab oe T, CL of Flow Cross 17.4 ft �-- Master CL of Master 18.8 ft LDS O IA 8J& OA LDS Ground Level T2 Choke Line Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: ZIL�Z c/ ! �_ ! PTD: 2.1 v Development Service —Exploratory _ Stratigraphic Test —Non -Conventional FIELD: Glc _ POOL: �j l / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are / also required for this well: Well Logging Requirements er Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST yield i£ Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#:2190560 Company BP EXPLQRATION (ALASKA) INC _ Initial Class/Type _ _ Well Name: PRUDHOE BAY UNIT 11-11A _ Program DEV _ Well bore seg ❑ DEV / PEND _GeoArea 890 _ Unit 11450 On/Off Shore _OnAnnular Disposal ❑ Administration 1 Permit fee attached _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ NA.... 2 Lease number appropriate.. _ _ _ _ _ _ _ _ ....... Yes _ Entire well in ADL0028325. 3 Unique well name and number _ - - - - - - - - - Yes 4 Well located in a. defined pool.. _ _ _ _ ..... _ Yes _ _ PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341G '5 Well located proper distance from drilling unit boundary ........ _ Yes CO 341G, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be _ 6 Well located proper distance from other wells _ _ _ _ _ .. _ ... Yes opened. in a well closer than 500 feet to the boundary of She affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit. _ _ _ .. _ _ _ _ Yes _ 341G, Rule 2... 8 If deviated, is wellbore plat included .. _ _ _ _ _ _ _ ... Yes 9 Operator only affected party... _ _ _ _ _ _ _ _ _ _ . Yes _ 10 Operator has. appropriate bond in force ... _ _ .. _ _ _ _ Yes _ 11 Permit can be issued without conservation order _ _ _ Yes Appr Date 12 Permit can be issued without administrative.approval _ _ ... _ _ _ _ _ _ Yes _ 13 Can permit be approved before 15 -day wail Yes SFD 4/9/2019 _ _ _ _ _ _ _ _ ... 14 Welllocated within area and strata authorized by Injection Order # (put. 10# in comments) (For NA 15 All wells. within 1/4 mile area. of review identified (For service well only). _ _ . _ _ _ _ _ _ _ _ NA. 16 Pre -produced injector: duration of pre production less. than. 3 months. (For service well only) .. NA_ _ _ _ _ _ _ _ _ .......... 17 1 onconvQn, gds conforms to AS31.05,030Q.1.A),tj.2.A-D) _ _ _ _ _ ...... _ _ _ _ NA 18 Conductor string_ provided ............ . . . . . _ _ _ _ _ _ _ .... NA ...... CTD sidetrack below production tubing. All drilling within the reservoir... . Engineering 19 Surface casing_ protects all. known USDWs _ _ _ _ _ _ _ _ _ _ .. NA..... _ CTD sidetrack below. production tubing All. drilling within the reservoir.. 20 CMT vol adequate to circulate on conductor & surf _csg _ _ _ _ ...... _ _ NA... _ CTD sidetrack below production tubing.. All drilling within the reservoir. 21 CMT vol adequate to tie-in long string to surf csg_ _ _ _ _ _ _ _ _ _ .. NA.. CTD sidetrack below production tubing.. All drilling within the reservoir. 22 CMT will coverall known productive horizons _ _ _ _ _ _ ... Yes _ Fully cemented production line[ 23 Casing designs adequate for C, T, B &_ permafrost. . . . . . ....... . Yes 24 Adequate tankage.or reserve pit _ _ _ _ _ _ _ _ _ _ _ Yes Drilled from CDR 2, Ongoing operations________ 25 If. a, red[ill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ _ _ Yes _ _ Variance to 25.112(i) approved.foralternate plug placement 26 Adequate wellbore separation proposed _ _ _ _ .. _ _ _ _ Yes _ _ _ Directional wellplan meets all BP separations criteria 27 If diverter required, does it meet regulations. _ _ _ _ _ _ _ _ _ _ _ _ NA _ CTD sidetrack below. production Iubing..All drilling within the reservoir. Appr Date 28 Drilling fluid program schematic & equip list adequate... _ _ _ _ _ _ _ _ _ ____ Yes _ _ _ _ All drilling overbalanced to reservoir _ _ _ .......... MGR 4/12/2019 29 BOPEs, do they meet regulation _ _ _ _ ..... _ Yes _ _ _ 5K BOPS, standard CTD BOPE 30 BOPE press rating appropriate: test to_(put prig in comments)_ _ _ _ _ Yes _ .. BOPE will be tested to 3500 psi 31 Choke manifold complies WAR. RP -53 (May 84)_ _ _ _ _ _ ... . .. . . . . . ... Yes 32 Work will occur without operation shutdown _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 33 Is presence of H2S gas probable _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ Yes . _ _ _ _ DS 11 is an H2S pad. ,BP standard monitoring in place. 34 Mechanical condition of wells within AOR verified (For service well only) __ _ _ _ _ _ _ _ _ _ ___ NA..... _ _ Development producer 35 Permit can be issued w/o hydrogen sulfide measures..... .... _ No_ _ _ _ _ D$ 11 wells are. H2S-bearing. H2S measures are required. Geology 36 Data.presented on potential overpressure zones. _ _ _ ... _ Yes _ _ _ _ .. Expected reservoir pressure is 7,47 ppg EMW: will be drilled using 8.4 ppg mud & coiled tubing. - Appr Date 137 Seismic analysis of shallow gas. zones_ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA, .. _ .. _ _ Should higher pore_ pressures be encountered, BP has_immediate access to nearby fluid mixing facilities.. . SFD 4/9/2019 38 Seabed condition survey (if off -shore) .... _ ....... _ _ _ _ NA..... _ _ _ _ _ . ...... ..... . . . . . . . . 39 Contact name/phone for weekly. progress reports [exploratory only) ..... . . . . . . . . ....NA Geologic Engineering Public Commissioner: Date: Date Date Commissioner: Commissioner