Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-062Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 08/26/2025
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20250826
Well API #PTD #Log Date Log
Company Log Type AOGCC
E-Set#
BCU 24 50133206390000 214112 7/15/2025 AK E-LINE PPROF
T40803
BR 11-86 50733207370000 225057 7/30/2025 AK E-LINE Hoist
T40804
BR 11-86 50733207370000 225057 8/4/2025 AK E-LINE Perf
T40804
BR 11-86 50733207370000 225057 8/9/2025 AK E-LINE Perf
T40804
BRU 212-35T 50283200970000 198161 8/4/2025 AK E-LINE Perf
T40805
BRU 212-35T 50283200970000 198161 6/28/2025 AK E-LINE Perf
T40805
BRU 224-34T 50283202050000 225044 8/2/2025 AK E-LINE CBL
T40806
BRU 224-34T 50283202050000 225044 8/5/2025 AK E-LINE CBL
T40806
BRU 224-34T 50283202050000 225044 7/27/2025 AK E-LINE CBL
T40806
BRU 224-34T 50283202050000 225044 8/2/2025 AK E-LINE Punch
T40806
KTU 43-6XRD2 50133203280200 205117 7/26/2025 AK E-LINE Perf
T40807
MPL-13A 50029223350100 223017 8/10/2025 READ CaliperSurvey
T40808
NCIU A-21 50883201990000 224086 1/14/2025 AK E-LINE Plug/Perf
T40809
ODSN-16 50703206200000 210053 8/10/2025 READ CaliperSurvey
T40810
PBU 01-30A 50029216060100 225050 8/7/2025 HALLIBURTON RBT-COILFLAG
T40811
PBU 06-11A 50029204280100 225042 7/13/2025 HALLIBURTON RBT-COILFLAG
T40812
PBU 11-37A 50029227160100 219062 7/27/2025 HALLIBURTON RBT
T40813
PBU 14-43A 50029222960100 225041 7/31/2025 HALLIBURTON RBT-COILFLAG
T40814
PBU F-06B 50029200970200 225054 8/5/2025 HALLIBURTON RBT-COILFLAG
T40815
PBU L1-10A 50029213400100 225032 8/1/2025 HALLIBURTON RBT-COILFLAG
T40816
PCU 02A 50283200220100 224110 7/27/2025 AK E-LINE Perf
T40817
SRU 241-33 50133206630000 217047 7/28/2025 AK E-LINE Perf
T40818
WhiskeyGulch 1 50231200790000 221046 6/18/2025 AK E-LINE Packer
T40819
Please include current contact information if different from above.
T40813PBU 11-37A 50029227160100 219062 7/27/2025 HALLIBURTON RBT
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2025.08.27 08:12:23 -08'00'
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU 11-37A
Punch Tubing x2
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
219-062
50-029-22716-01-00
10775
Conductor
Surface
Intermediate
Liner
8678
80
3783
8550
3248
7500
20"
9-5/8"
7"
3-1/2" x 3-1/4" x 2-7/8"
7467
27 - 107
26 - 3809
25 - 8575
7525 - 10773
27 - 107
26 - 3803
25 - 8477
7491 - 8679
7505
470
4760
5410
10530
7525
1490
6870
7240
10160
9234 - 10702
4-1/2" 12.6# 13Cr80 21 - 7580
8716 - 8698
Structural
4-1/2" Baker S-3 Packer
7502
7470
David Bjork for Bo York
Operations Manager
David Bjork
david.bjork@hilcorp.com
907.564.4672
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028325
21 - 7542
N/A
N/A
82
Well Not Online
5177 1877
324
224
0
324-537
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
7502, 7470
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Gavin Gluyas at 1:04 pm, Aug 14, 2025
Digitally signed by David
Bjork (3888)
DN: cn=David Bjork (3888)
Date: 2025.08.14 12:23:31 -
08'00'
David Bjork
(3888)
RBDMS JSB 081825
J.Lau 11/4/25
ACTIVITY DATE SUMMARY
10/19/2024
***WELL S/I ON ARRIVAL***
TROUBLESHOOT RESTRICTION IN TBG HANGER (see log for details)
***CONT WSR ON 10/20/2024***
*****PERFORM WELL CONTROL DRILL W/ WSL*****
10/20/2024
***CONT WSR FROM 10/19/2024***
TROUBLESHOOT SCALE RESTRICTION FROM 0' SLM TO 50' SLM (see log for
details ~3.60 id)
TAG DEP SLV @ 7,525' MD W/ 3.6" CENT & 3.49" LIB (no impression)
BAIL 2 CUPS OF SCALE FROM 2-7/8 PLUG IN PTSA @ 7,538' MD W/ 10' x 2"
PUMP BAILER
SET 3-1/2" STANDING VALVE IN DEP SLV @ 7,500' SLM(undersize due to reduced
Well ID / 25' correction)
SET 3-1/2" BAIT SUB CATCHER ON 3-1/2" STANDING VALVE @ 7,525' MD
PULL 1" BK-DMY GLV FROM STA #4 @ 4,101' MD (4093' SLM) 8' correction
PULL 3-1/2" BAIT SUB CATCHER FROM 3-1/2" STANDING VALVE @ 7,525' MD
***CONT WSR ON 10/21/2024***
10/21/2024
***CONT WSR FROM 10/20/2024***
DUMP BAIL SAND W/ 10' x 3.5" DUMP BAILER. FROM 7501' SLM TO 7,484' SLM
(7,516.5' MD TO 7,499.5' MD)
TAG SAND @ ~7,499.5' MD W/ SAMPLE BAILER.
TAG ST# 1 DGLV @ 7,318' SLM (7,330' MD mandrel, 7,333.5' MD pocket, 15.5'
correction)
***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF WELL STATUS***
10/26/2024
***WELL SHUT IN ON ARRIVAL*** (TUBING PUNCH / CEMENT RETAINER)
RIG UP AKE PCE FUNCTION TEST WLV'S
PT 250L 3000H
CORRELATE CCL TO TUBING TALLY
PERFORATE TUBING WITH 3' 1-9'16 TUBING PUNCHER (7494-7497)
CCL STOP DEPTH= 7487.2' (CCL-TS=6.8'). CONFIRM SHOTS FIRED
SET NS 3.57" COMPOSITE CEMENT RETAINER @ 7485'
CCL STOP DEPTH=7476.7' (CCL-ME=8.3'). TAG AFTER SET
RDMO AKE
***WELL SHUT IN ON DEPARTURE*** PAD OP NOTIFIED
6/18/2025
LRS CTU #2 1.75" 0.156 WT Job Scope: IA Cmt SQZ
MIRU. MU YJ CTC, NS MHA w/ 3.7 drift nozzle. Tag at the hanger, 16' CTM. Change
up drift to 3.6" drift nozzle. Drift to 2500'. Finish swapping coil to diesel. MU NS
stinger drift w/ 3.6" nozzle. RIH.
******Job continued 6/19/25****
Daily Report of Well Operations
PBU 11-37A
Daily Report of Well Operations
PBU 11-37A
6/19/2025
LRS CTU #2 1.75" 0.156 WT Job Scope: IA Cmt SQZ ***Job continued from
6/18/25***
Tag cement retainer with nozzle 7507' CTM. Jet on top. Flag coil for depth reference.
MU NS stinger assembly. RIH and sting into retainer. Could not communicate through
tubing punches. POOH. BD NS stinger assembly. MU HES tubing punch with NS
MHA. RIH. Punch tubing at 7445-7448'. POOH. BD HES tubing punch BHA. MU
Northern Solutions CI CMT Retainer setting BHA. Correlate at the flag to COE. Set
NS retainer 7410'. Could not communicate through tubing punches. POOH.
***Job Continued 6/20/21***
6/20/2025
LRS CTU #2 1.75" 0.156 WT Job Scope: IA Cmt SQZ ***Job continued from
6/19/25***
Continue OOH w/ NS stinger assembly. MU YJ milling Assembly and 3.8" reverse
clutch mill. Mill scale down to 104'. POOH. Swap bits. RIH w/ YJ milling assembly and
3.60" reverse clutch mill. Tag CI Cement Retainer at 7423'. Begin milling. Push Cast
Iron Cement Retainer to lower Composite Bridge Plug. POOH. BD reverse clutch
junk mill. MU YJ venturi burnshoe bha. RIH. Tag composite bridge cement retainer
and CICR remnants at 7491'. Make a couple of venturi passes before milling. Milled
down to 7494.6' Stalled the motor. POOH to check. Recovered scale and sand. No
plug parts. MU YJ shoe with larger ID. Tag 7492' begin milling, Pump gel sweep
around.
***Job Continued 6/21/25***
6/21/2025
LRS CTU #2 1.75" 0.156 WT Job Scope: IA Cmt SQZ ***Job continued from
6/20/25***
Ran burn shoe down to 7495'. Stopped making progress. POOH. Recovered 1 slip
segment, sand and scale. Perform pipe maint. Swap pack offs. MU YJ milling
assembly and 3.63" junk mill. RIH. Mill and push cement retainers down to sand plug.
Swept debris with gel pill. Chase gel OOH. FP Tubing and IA to 2500'. BD YJ milling
assembly and 3.63" junk mill. RDMO.
***Job Incomplete***
7/26/2025
T/I/O=200/400/0 Temp=S/I (Assist SL with Circ out) Pumped 20 bbls of SW down
the TBG taking returns up the IA and to an open top tank. ******WSR Continued on 7-
27-2025******
7/26/2025
***WELL S/I ON ARRIVAL***
SET 3-1/2" BAIT SUB CATCHER ON TOP OF CEMENT RETAINER @ 7485' MD
*** CONT ON 7/27 ***
7/27/2025
******WSR Continued from 7-26-2025****** (TFS unit 1 Assist S-Line with Circ out)
Pumped 247 bbls of SW and 150 bbls of 1% KCL down the TBG and up the IA taking
returns to an open top tank for a log. ****WSR Continued on 7-28-2025****
Daily Report of Well Operations
PBU 11-37A
7/27/2025
*** WSR CONT FROM 7/26 ***
SET BK-DGLV IN STA #4 @ 4101' SLM
ESTABLISHED LLR OF 1.5bbls
RAN KJ, 2.80'' CENT, HES CBL/SPIN/TEMP LOG, SPINNER STOPPED WORKING,
DATA INCOMPLETE
*** WSR CONT ON 7/28 ***
7/28/2025
*** WSR CONT FROM 7/27 ***
RAN LDL FROM 7469' SLM TO SURFACE
BAILED 6 GAL OF SAND OFF TOP OF CATCHER @ 7483' SLM
JARRED ON CATCHER w/ 3-1/2" GR FOR 20 MINUTES
*** WSR CONT ON 7/29 ***
7/28/2025
****WSR Continued from 7-27-2025****** (TFS unit 1 assist S-Line with Circ out/Log)
Pumped 138 bbls of 1% KCL down the TBG for Log, Pumped a further 38 bbls of
DSL down the TBG and 45 bbls of DSL down the IA for Freeze Protects. Well left in
Slick Line control.
Final WHPS 1300/1200/200
7/29/2025
*** WSR CONT FROM 7/28 ***
PULLED EMPTY 3-1/2" BAIT SUB CATCHER
*** WELL LEFT S/I ON DEPARTURE ***
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in this pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU 11-37a
IA Packer Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
219-062
50-029-22716-01-00
ADL 0028325
10775
Conductor
Surface
Intermediate
Production
Liner
8678
80
3783
8550
3248
10755
20"
9-5/8"
7"
3-1/2" x 3-1/4" x 2-7/8"
8683
27 - 107
26 - 3809
25 - 8575
7525 - 10773
2230
27 - 107
26 - 3803
25 - 8477
7491 - 8679
none
470
4760
5410
10530
none
1490
6870
7240
10160
9234 - 10702 4-1/2" 12.6# 13Cr80 21 - 75808716 - 8698
Structural
4-1/2" Baker S-3 Perm
No SSSV
7502 7470
Date:
Bo York
Operations Manager
Dave Bjork
David.Bjork@hilcorp.com
(907) 564-5006
PRUDHOE BAY
09/02/2024
Current Pools:
PRUDHOE OIL
Proposed Pools:
PRUDHOE OIL
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
/
Digitally signed by Bo York
(1248)
DN: cn=Bo York (1248)
Date: 2024.08.20 14:43:16 -
08'00'
Bo York
(1248)
324-537
By Grace Christianson at 12:42 pm, Sep 19, 2024
SFD 9/19/2024 DSR-9/26/24
2230
10-404
* State witness MIT-IA to 3000 psi.
* Biennial MIT-IA to 3000 psi.
5:26 pm, Oct 01, 2024
MGR02OCT24
* Required compliance to CO 736 Rules for TOC and MITs.
JLC 10/2/2024
Gregory Wilson
Digitally signed by Gregory
Wilson
Date: 2024.10.02 14:28:22
-08'00'10/02/24
RBDMS JSB 100324
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Well Name: 11-37a API Number: 50-029-22716-01
Current Status: Not Operable PAL Rig: SL / EL / RWO
Estimated Start Date: September 2024 Estimated Duration: 5 day(s)
Regulatory Contact: Carrie Janowski
First Call Engineer: David Wages 713.380.9836
Second Call Engineer: David Bjork 907.564.4672 (O) 907.440.0331 (M)
AFE: Cost:
IOR: 73
Current Bottom Hole Pressure: 3300 psi @ 8,700’ TVD 7.3 PPGE
MASP: 2230 psi 0.1 psi/ft gas gradient
Last SI WHP: 0 psi Current
Min ID: 2.31” @ X @ 7536’ MD
Max Angle: 108 deg @ 10,580’ MD
70Deg: 8760’ MD
Partner Approval?: Required
AOGCC Approval?: 10-403/404 required
Brief Well Summary:
11-37A is a 2019 coiled tubing sidetrack targeting the 22P and 24P. Liner was successfully run and cemented as
planned but the liner lap test failed. Initial perforating of 578' ft in Z2A and Z2B was performed on rig. Initial
POP rates in HP were ~3100 GFR at 88% WC with minimal gas. While competitive, these rates were not as
expected.
Post rig wellwork consisted of setting a LTP and adding perfs in Z2A and toe perfs in Z2B. The well was POPd
into LP through a portable separator and rates came in at ~5500 GFR at 98% WC and 1.2MMSCF/D formation
gas. During the post rig add perf intervention a CBL was also pulled showing no cement isolation over the toe of
the well where it is suspected that the 24P is wet and in communication with the 22P perfs.
In June 2023, coil attempted set a CBP to isolate the toe of the well and the RPM verified water source but ran
into heavy scale. After milling attempts with very little progress, ops tried to POP and AL pressure dropped
from 1700 to 500 psi indicating a GLV issue. Following GLV C/O, they stacked the well out to GL then attempted
a TIFL that failed followed by bleeding the IA to 130 psi bringing the IA fluid level back to surface. A sample was
taken to the lab where elevated levels of Barium were seen indicating a PC leak.
Currently, there is a confirmed hole at 4109’ at the St#4 GLM, this will be addressed after the cement job via a
tubing patch. There is a PC leak that was identified via temp log at ~5710’, this will be addressed via the packer
squeeze. Once repaired, the well should make 120+ IOR.
History:
5/2016: LELs detected at 1:00 position on SC flutes, MIT-OA passed to liquid and N2.
7/2016: SL drift w/ 3.7” dmy whipstock, EL set HEX @8785’
Remainder of 2016 the OA was monitored and bled several times.
1/2017: EL perforated 8743’-8748’ per 2014 RPM
5/2017: Perforate 8622’ – 8632’, set posiset plug @ 8720’, dumped cement on plug
12/2018: SL set plug and obtain passing MIT-T and CMIT
6/2019: dmy valve, MIT, issues getting HEW WS to depth, stuck at 3630’, ERD from baker setting tool. Slickline
followed up and retrieved the WS and setting tool. Eline followed up and set the CTD sidetrack whipstock.
8/2019: CTD sidetrack.
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
9/2019: SL set LTP, pressure tested, installed LGLVs
10/2019: Coil RPM log, perforate 10,682’ – 10,702’, 10,569’ – 10,600’, 9909’ – 9940’. Ran CBL. Per 9334’ –
9365’, 9320’ – 9334’, 9234’ – 9254’.
2/20220: SL drift to deviation with 20’ x 1.75” to 8737’
7/2022: GLRD
3/2023: GLRD
5/2023: SO stuck open, replace
6/2023: Coil attempt to set CBP, unable to pass 9020’. 2x milling attempts failed.
7/2023: CMIT failed, unable to catch pressure, replace St#3 GLV, unable to MIT-T
6/2024: LDL found production casing leak at 5710’
Objective:
Packer squeeze to repair PC leak, tubing patch to repair leak in St#4 mandrel
Procedure:
Slickline:
1. Drift to deviation.
2. Set LTTP in LTP.
3. Dump 15’ of sand on top of LTP.
a. 15’ of sand in 4-1/2” tubing: 140#.
4. Dump 3-5 of sluggets on top of sand.
5. Pull St#4 GLV.
Eline
6. Punch tubing @ 7495 - 7498’.
a. In lowest most 10’ above the tubing packer.
7. Set cement retainer @ ~7485’.
a. In 2nd lowest pup above tubing packer.
Coil:
8. Sting into cement retainer.
9. Confirm circulation down coil and up the IA.
10. If not already done, Circ CTBS and IA to diesel.
a. IA volume = 263 bbls.
b. 1.75” coil x 4-1/2” tubing annulus volume to 4101’: 50 bbls.
c. Total volume diesel needed: 313 bbls.
11. Circ in cement up the IA via pump schedule below:
a. 2-5 bbls fresh water.
b. 50.5 bbls cement.
i. 4.5”x7” annulus volume from 7502 to 5350: 38 bbls.
ii. Volume inside 4.5” below cement retainer: 0.4 bbls.
iii. Add 1 bbls excess to lay in on top of retainer.
iv. TOC Target: 5350’ (~1500’ below surface casing shoe)
1. 1500’ below SC shoe @ 3809’: 5350’ MD/5344’ TVD.
2. Base of SC: 3809’ MD/3803’ TVD (1541’ TVD above planned TOC).
3. Leak depth @ 5710’ MD/5704’ TVD (360’ TVD below planned TOC).
12. Unsting from cement retainer.
13. Lay in remaining cement, if pressures are stable, reverse out excess
TOC no shallower than 5350' MD. - mgr
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
a. Note that any pressures and fluid movement will be acting on the PC leak, be careful to avoid
flushing cement into leak. Historically, the leaks seem to squeeze themselves off fairly easily
14. WOC.
15. MU motor and mill and mill up cement retainer to sand on top of LTTP.
16. Pressure test wellbore to 3000 psi.
17. MU nozzle or venturi and clean up all sand on LTTP/LTP.
18. POH and RDMO.
Slickline
19. Pull LTTP
20. Set Nipple reducer in either X nipple @ 7481’ or 7557’
a. POGLM ID: 1.991”
b. 1.781”profile needed
2. Install plug in nipple reducer for MITs after patch is set
Eline:
21. Pull CBL from LTP to surface
a. To meet CO 736 requirements
b. Send to OE, David.wages@hilcorp.com
22. Set lower packer per tie in below:
c. Element at ~4130’.
d. ~36’ between packer elements
Slickline
23. Install POGLM and upper patch packer into lower packer.
24. Install LGLVs per GL engineer.
25. MIT-T to 3000 psi
26. MIT-IA to 3000 psi
a. AOGCC witnessed
DHD/Integrity
27. Update database to flag as CO736
28. Update Integrity management system to include AOGCC witnessed MITs every 2 years
CBL to AOGCC upon completion - mgr
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Current Wellbore Schematic:
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Squeeze Wellbore Schematic:
TOC no shallower
than 5350' MD.
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Final Proposed WBD:
TOC no shallower
than 5350' MD.
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Tubing punch and retainer set Tie-In log
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Tubing Patch Tie-In log:
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
4-1/2” 13Cr tubing tally
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
POGLM Info:
11-37a
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
11-37a
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Well Name:11-37a API Number:50-029-22716-01
Current Status:Not Operable PAL Rig:SL / EL / RWO
Estimated Start Date:September 2024 Estimated Duration:5day(s)
Regulatory Contact:Carrie Janowski
First Call Engineer:David Wages 713.380.9836
Second Call Engineer:David Bjork 907.564.4672 (O)907.440.0331 (M)
AFE:Cost:
IOR:73
Current Bottom Hole Pressure:3300 psi @ 8,700’ TVD 7.3 PPGE
MASP:2230 psi 0.1 psi/ft gas gradient
Last SI WHP:0 psi Current
Min ID:2.31” @ X @ 7536’ MD
Max Angle:108 deg @ 10,580’ MD
70Deg:8760’ MD
Partner Approval?:Required
AOGCC Approval?:10-403/404 required
Brief Well Summary:
11-37A is a 2019 coiled tubing sidetrack targeting the 22P and 24P. Liner was successfully run and cemented as
planned but the liner lap testfailed. Initial perforating of 578' ft in Z2A and Z2B was performed on rig. Initial
POP rates in HP were ~3100 GFR at 88% WC with minimal gas. While competitive, these rates were not as
expected.
Post rig wellwork consisted of setting a LTP and adding perfs in Z2A and toe perfs in Z2B. The well was POPd
into LP through a portable separator and rates came in at ~5500 GFR at 98% WC and 1.2MMSCF/D formation
gas. During the post rig add perf intervention a CBL was also pulled showing no cement isolation over the toe of
the well where it is suspected that the 24P is wet and in communication with the 22P perfs.
In June 2023, coil attempted set a CBP to isolate the toe of the well and the RPM verified water source but ran
into heavy scale. After milling attempts with very little progress, ops tried to POP and AL pressure dropped
from 1700 to 500 psi indicating a GLV issue. Following GLV C/O, they stacked the well out to GL then attempted
a TIFL that failed followed by bleeding the IA to 130 psi bringing the IA fluid level back to surface. A sample was
taken to the lab where elevated levels of Barium were seen indicating a PC leak.
Currently, there is a confirmed hole at 4109’ at the St#4 GLM, this will be addressed after the cement job via a
tubing patch. There is a PC leak that was identified via temp log at ~5710’, this will be addressed via the packer
squeeze. Once repaired, the well should make 120+ IOR.
History:
5/2016: LELs detected at 1:00 position on SC flutes, MIT-OA passed to liquid and N2.
7/2016: SL drift w/ 3.7” dmy whipstock, EL set HEX @8785’
Remainder of 2016 the OA was monitored and bled several times.
1/2017: EL perforated 8743’-8748’ per 2014 RPM
5/2017: Perforate 8622’ – 8632’, set posiset plug @ 8720’, dumped cement on plug
12/2018: SL set plug and obtain passing MIT-T and CMIT
6/2019: dmy valve, MIT, issues getting HEW WS to depth, stuck at 3630’, ERD from baker setting tool. Slickline
followed up and retrieved the WS and setting tool. Eline followed up and set the CTD sidetrack whipstock.
8/2019: CTD sidetrack.
confirmed hole at 4109’ at the St#4 GLM,
liner lap testfailed
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
9/2019: SL set LTP, pressure tested, installed LGLVs
10/2019: Coil RPM log, perforate 10,682’ – 10,702’, 10,569’ – 10,600’, 9909’ – 9940’. Ran CBL. Per 9334’ –
9365’, 9320’ – 9334’, 9234’ – 9254’.
2/20220: SL drift to deviation with 20’ x 1.75” to 8737’
7/2022: GLRD
3/2023: GLRD
5/2023: SO stuck open, replace
6/2023: Coil attempt to set CBP, unable to pass 9020’. 2x milling attempts failed.
7/2023: CMIT failed, unable to catch pressure, replace St#3 GLV, unable to MIT-T
6/2024: LDL found production casing leak at 5710’
Objective:
Packer squeeze to repair PC leak, tubing patch to repair leak in St#4 mandrel
Procedure:
Slickline:
1. Drift to deviation.
2. Set LTTP in LTP.
3. Dump 15’ of sand on top of LTP.
a. 15’ of sand in 4-1/2” tubing: 140#.
4. Dump 3-5’ of sluggets on top of sand.
5. Pull St#4 GLV.
Eline
6. Punch tubing @ 7495 - 7498’.
a. In lowest most 10’ above the tubing packer.
7. Set cement retainer @ ~7485’.
a. In 2
nd lowest pup above tubing packer.
Coil:
8. Sting into cement retainer.
9. Confirm circulation down coil and up the IA.
10. If not already done, Circ CTBS and IA to diesel.
a. IA volume = 263 bbls.
b. 1.75” coil x 4-1/2” tubing annulus volume to 4101’: 50 bbls.
c. Total volume diesel needed: 313 bbls.
11. Circ in cement up the IA via pump schedule below:
a. 2-5 bbls fresh water.
b. 50.5 bbls cement.
i. 4.5”x7” annulus volume from 7502 to 4700: 49 bbls.
ii. Volume inside 4.5” below cement retainer: 0.4 bbls.
iii. Add 1 bbls excess to lay in on top of retainer.
iv. TOC Target: 1000’ above PC leak @ 5710’: 4700’ MD/4694’ TVD.
1. Base of SC: 3809’ MD/3803’ TVD (891’ TVD above planned TOC).
2. Leak depth @ 5710’ MD/5704’ TVD (1010’ TVD below planned TOC).
12. Un-sting from cement retainer.
13. Lay in remaining cement, if pressures are stable, reverse out excess
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
a. Note that any pressures and fluid movement will be acting on the PC leak, be careful to avoid
flushing cement into leak. Historically, the leaks seem to squeeze themselves off fairly easily
14. WOC.
15. MU motor and mill and mill up cement retainer to sand on top of LTTP.
16. Pressure test wellbore to 3000 psi.
17. MU nozzle or venturi and clean up all sand on LTTP/LTP.
18. POH and RDMO.
Slickline
19. Pull LTTP
20. Set Nipple reducer in either X nipple @ 7481’ or 7557’
a. POGLM ID: 1.991”
b. 1.781”profile needed
2. Install plug in nipple reducer for MITs after patch is set
Eline:
21. Run CBL from LTP to surface
a. To meet CO 736 requirements
b. Send to OE, David.wages@hilcorp.com
22. Set lower packer per tie in below:
c. Element at ~4130’.
d. ~36’ between packer elements
Slickline
23. Install POGLM and upper patch packer into lower packer.
24. Install LGLVs per GL engineer.
25. MIT-T to 3000 psi
26. MIT-IA to 3000 psi
DHD/Integrity
27. Update database to flag as CO736
28. Update Integrity management system to include AOGCC witnessed MITs every 2 years
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Current Wellbore Schematic:
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Squeeze Wellbore Schematic:
5350' MD
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Final Proposed WBD:
5350' MD
Superceded
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Tubing punch and retainer set Tie-In log
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
Tubing Patch Tie-In log:
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
4-1/2” 13Cr tubing tally
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
POGLM Info:
11-37a
11-37a Packer Squeeze
PTD: 219-062
API: 50-029-22716-01
11-37a
DATA SUBMITTAL COMPLIANCE REPORT
113/2020
Permit to Drill
2190620 Well Name/No. PRUDHOE BAY UNIT 11-37A p6 _. Operator
BP Exploration (Alaska) Inc. API No. 50-029-22716-01.00
MD 10775
TVD 8678 Completion Date
8/29/2019 Completion Status 1-0IL
Current Status 1 -OIL UIC No
REQUIRED INFORMATION
Directional Survey Yes
Mud Log No
Samples No V/
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES, GR/CCL/RPM
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data Digital
Dataset
Log Log Run Interval
OH I
Type Med/Frmt
Number Name
Scale Media No Start Stop
CH Received
Comments
ED C
31348 Digital Data
8470 10730
10/22/2019
Electronic Data Set, Filename: 11-
37A_MRPM_ PNC3D_RAW_PASS0IUP_13OCT
2019_BHl.las
ED C
31348 Digital Data
8496 8776
10/22/2019
Electronic Data Set, Filename: 11-
37A_MRPM_ PNC3D_RAW_PASS02UP_13OCT
2019 BHI.las
ED C
31348 Digital Data
10/22/2019
Electronic File: 11-
37A_MRPM_ PNC3D_RAW_PASS0IUP_13OCT
2019 BHI.dlis
ED C
31348 Digital Data
10/22/2019
Electronic File: 11-
37A MRPM PNC3D_RAW_PASS02UP_13OCT
2019 BHI.dlis
ED C
31348 Digital Data
10/22/2019
Electronic File:
BP 11 37 MRPM_PNC3D_13_OCT_2019_BHI.
meta
ED C
31348 Digital Data
10/22/2019
Electronic File:
BP_11_37_MRPM_PNC3D_13_OCT_2019_BHI.
meta.PDF
Log
31348 Log Header Scans
0 0
2190620 PRUDHOE BAY UNIT 11-37A LOG
HEADERS
ED C
31419 Digital Data
8210 10775
11/8/2019
Electronic Data Set, Filename: 11-
37A_LW D_ FINAL_ FIELD_COMPOSITE_24AUG
2019_BHI_CTK.Ias
ED C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A GR Res_ 24AUG2019_MD_FINAL_FIELD_
BHI_CTK.cgm j
AOCCC
Page 1 of 4
Friday, January 3, 2020
DATA SUBMITTAL COMPLIANCE REPORT
113/2020
Permit to Drill
2190620 Well Name/No. PRUDHOE BAY UNIT 11-37A Operator BP Exploration (Alaska) Inc. API No. 50-029-22716-01-00
MD
10775
TVD 8678 Completion Date 8/29/2019
Completion Status 1 -OIL Current Status 1 -OIL UIC No
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A_GR_Res_ 24AUG2019_TVDSS_FINAL_FIE
LD_BHI_CTK.cgm
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A_GR_Res _ 24AUG2019_MO_FINAL_FIELD_ I
BHI_CTK.pdf I
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A_GR_Res _ 24AUG2019_TVDSS_FINAL_FIE
LD_BHI_CTK.pdf
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A Final Surveys.csv
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A Final Surveys.pdf
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A Final Surveys.txt
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A Final Surveys.xlsx
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A_25_tapescan_BHI CTK.txt
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A_5_ tapescan_BHI_CTK.txt
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-37A_output.tap
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A_GR_Res _ 24AUG2019_MD_FINAL_FIELD_
BHI_CTK.fif
ED
C
31419 Digital Data
11/8/2019
Electronic File: 11-
37A GR Res 24AUG2019_TVDSS_FINAL_FIE
LD_BHI_CTK.tif
Log
31419 Log Header Scans
0 0
2190620 PRUDHOE BAY UNIT 11-37A LOG
HEADERS
ED
C
31420 Digital Data
8210 10490 11/8/2019
Electronic Data Set, Filename: 11-
37APB1_LWD_FINAL FIELD_COMPOSITE_19
AUG2019_BHI_CTK.las
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37AP81_GR_Res_19AUG2019_MD_FINAL_FIE
LD_BHI_CTK.cgm
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_GR_Res_19AUG2019_TVDSS_FINAL_
FIELD_ BHI_CTK.cgm
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_GR_Res_19AUG2019_MD_FINAL_FIE
LD_BHI_CTK.pdf
AOGCC
Page 2 of 4
Friday, January 3, 2020
DATA SUBMITTAL COMPLIANCE REPORT
1/3/2020
Permit to Drill 2190620 Well Name/No. PRUDHOE BAY UNIT 11-37A Operator BP Exploration (Alaska) Inc. API No. 50-029-22716.01.00
MD
10775
TVD 8678 Completion Date 8/29/2019
Completion Status 1 -OIL
Current Status 1 -OIL UIC No
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_GR_Res 19AUG2019_TVDSS_FINAL_
FIELD_ BHI_CTK.pdf
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-37APB1 Final Field Survey.csv
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-37APB1 Final Field
Survey.xlsx
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-37APB1 Final Surveys.pdf
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-37APB1 Final Surveys.txt
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_25_tapescan_BHI _CTK.txt
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_5_tapescan_BHI _CTK.txt
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-37APB1_output.tap
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1_GR _ Res 19AUG2019_MD_FINAL_FIE
LD BHI CTK.tff
ED
C
31420 Digital Data
11/8/2019
Electronic File: 11-
37APB1 GR Res_19AUG2019_TVDSS_FINAL_
FIELD_BHI_CTK.tif
Log
31420 Log Header Scans
0 0
2190620 PRUDHOE BAY UNIT 11-37A P81
LOG HEADERS
ED
C
31490 Digital Data
10738 6486
11/25/2019
Electronic Data Set, Filename: 11-
37A_C1_20191014_RBT_HAL_MEM_MAIN.las
ED
C
31490 Digital Data
11/25/2019
Electronic File: 11-
37A_C1_20191014_RBT_HAL_MEM.pdf
ED
C
31490 Digital Data
11/25/2019
Electronic File: 11-
37A_C 1 _20191014_RBT_HAL_MEM_img.tiff
ED
C
31490 Digital Data
11/25/2019
Electronic File: 11-
37A_C1 20191014_RBT_HAL_MEM_MAIN.dlis
ED
C
31490 Digital Data
11/25/2019
Electronic File: 11-
37A_C1_20191014_RBT_HAL_MEM_REPEAT.dI
is
Log
31490 Log Header Scans
0 0
2190620 PRUDHOE BAY UNIT 11-37A LOG
HEADERS
AOGCC Page 3 of 4 Friday, January 3, 2020
DATA SUBMITTAL COMPLIANCE REPORT
1/312020
Permit to Drill 2190620 Well Name/No. PRUDHOE BAY UNIT 11.37A Operator BP Exploration (Alaska) Inc.
MD 10775 TVD 8678 Completion Date 8/29/2019 Completion Status 1-0I1 Current Status 1-0I1
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
INFORMATION RECEIVED//
Completion Report lJ
Production Test Information/,;) NA
Geologic Markers/Tops (vYv;
COMPLIANCE HISTORY
Completion Date: 8/29/2019
Release Date: 4/23/2019
Description
Comments:
Compliance Reviewed B 1.
API No. 50-029-22716-01-00
LIC No
Directional / Inclination Data �� Mud Logs, Image Files, Digital Data Y /(I4 ,, Core Chips Y 1(4A)
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files `Y �' Core Photographs Y 1 A
>r
Daily Operations Summary Yl Cuttings Samples Y /I A Laboratory Analyses Y /NA'
Date Comments
Date: ll 7 (z
AOOCC Page 4 of 4 Friday, January 3, 2020
WELL LOG TRANSMITTAL #906043206
To: Alaska Oil and Gas Conservation Comm.
Attn.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Radial Cement Bond Log: 11-37A
Run Date: 10/14/2019
219062
31490
November 18, 2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of.-
Fanny
f:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
11-37A
Data in LAS format, Digital Log Image files
50-029-22716-01
RECEIVED
NOV 2 5 2019
AOGCC
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS ANC@halllliibu�rton.com and GANCPDC@USAANC.hou.
Date: w l Signed:
Baker
Hughes
PRINT DISTRIBUTION LIST
COMPANY BP Exploration Alaska Inc.
WELL NAME
11-37APB1
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Ride�m
STATUS
COMPANY
21 9062
31420
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, LR2-1
) E. Benson Blvd.
:h, AK 99508 or GANCPDC@bp365.onmicrosoft.com
LOG TYPE GR - RES
LOG DATE August 19, 2019
TODAYS DATE November 7, 2019
Revision
Final Replacement: No Details:
Rev. Requested by:
ADDRESS (FEDEX WILL NOT DELNER TO P.O. BOX)
PERSON ATTENTION
V
BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
FIELD I
FINAL
CD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN t
V, rMIN
# OF COPIES
j#OFCOPlEs
# OF COPIES
4 4 lu
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501 A _
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas *•*
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
j*** Stamp 'confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Christopher Ratzlaff
q n„ _ 2019
TOTALS FOR THIS PAGE: 0 1 4 1 0
Baker
Hughes
PRINT DISTRIBUTION LIST
COMPANY BP Exploration Alaska Inc.
WELL NAME
11-37A
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider@bhge.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P O. BOX)
PERSON ATTENTION
V
RP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Be... Blvd.
Anchorage, Alaska 99508
2 ConocoPhilops Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
No
21 9D 62
31419
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, LR2-1
I E. Benson Blvd.
;h, AK 99508 or GANCPDC@bp365.onmicrosoft.com
LOG TYPE GR -RES
LOG DATE August 24, 2019
TODAYS DATE November 7, 2019
Revision
Details:
Rev. Requested by: ---
FIELDI
FINAL
CD/DVD
FINAL
PRELIM
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
at OF COPIES
I#OFCOPIES
# OF COPIES
NOV 0 8 2019
AOGCC
3 ExxonMobil, Alaska 1
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage. AK 99503
41 State of Alaska - AOGCC 1 1
Atm: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ... 1
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*e% Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Christopher Ratzlaff
TOTALS FOR THIS PAGE: 0 1 4 1 0
STATE OF ALASKA
3KA OIL AND GAS CONSERVATION COMMISSIq
cPORT OF SUNDRY WELL OPERATION
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Pull Tubing ❑ Operations shutdown
❑
Suspend ❑ Perforate 0 Other Stimulate ❑
Alter Casing ❑ Change Approved Program
❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑
Re-enter Susp Well ❑ Other:
❑
2. Operator Name: BP Exploration (Alaska), Inc
4, Well Class Before Work
Development 0
Exploratory ❑
5. Permit to Drill Number. 219-062
3. Address: P.O. Box 196612 Anchorage,
AK 99519-0612
Stratigraphic ❑
Service 11
6. API Number: 50-029-22716-01-00
7 Property Designation (Lease Number): ADL 028325
8.
Well Name and Number: PBU 1137A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10.
Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
R Em EIVED
11, Present Well Condition Summary:
Total Depth: measured 10775 feet Plugs
measured None feet Q
NOV17 Y 5 Z��Jry
true vertical 8678 feet Junk
measured None feet
Effective Depth: measured 10755 feet Packer
measured 7502 feet
true vertical 8683 feet Packer true
vertical 7469 feet AOGCC
Casing: Length: Size: MD:
TVD: Burst: Collapse:
Structural
Conductor 80 20" 27-107
27-107 1490 470
Surface 3783 9-5/8" 26-3809
26-3803 6870 4760
Intermediate 8550 7" 25-8575
25-8477 7240/8160 5410/7020
Production
Liner 3248 3-1/2" x 3-1/4" x 2-7/8" 7525-10773
7491 -8679
Perforation Depth. Measured depth: 9234-10702 feet
True vertical depth: 8716-8698 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80
21-7580 21-7542
Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer
7502 7469
true vertical depth)
No SSSV Installed
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-McF
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
385
706
2749
1717
786
Subsequent to operation:
92
1232
5469
1632
460
14. Attachments: (required per 20 MC 25.07025071, a 25250)
15. Well Class after work:
Daily Report of Well Operations 0
Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil 0 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
IGSTOR ❑ WINJ ❑
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and comect to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
N/A
Authorized Name: Alatalo, Travis
Contact Name: Alatalo, Travis
Authorized Title: Production Engineer
Contact Email: Travis.AlataloMp.com
Authorized Signature: t 1, 1 r , Contact Phone: +1 9075645351
Farm 10-404 Revised 04/2017 �e 1027//(' 3BDM&/NOV 90bflit lOnly
Daily Report of Well Operations
PBU 11-37A
ACTIVITVnATF SI IMMARV
CTU #9 1.75" coil
Job Objective: RPM log/CBUAdperf
Well flowing upon arival. MIRU. BOP test. MU & RIH w/ 2.25" DJN. Load well w/ 205 bbls 1 % slick
KCL w/ Safelube. Tag TD at 10753' CTM. Paint red flag at 10700' CTM, 53off bottom. POOH. MU
Baker RPM logging toolstring and RIH.
10/12/2019
"Continued on 10/13/19 WSR **
CTU #9 1.75" coil
** Continued from 10/12/19 WSR ** Job Objective: RPM log / CBL / Adperf
RIH with Baker RPM log. Log up @ 20 fUm from 10,730'- 8,450'. Repeat pass from 8,775'- 8,525'.
POOH. Confirm good data, +4' correction, tie into Baker MWD log Dated 23 -Aug -2019. MU & RIH
w/ 20' x 2" PowerJet perforating guns. Perforate 10682' - 10702'. POOH. Confirm shots fired, ball
recovered. MU & RIH w/ 31'x 2" PowerJet perforating guns. Perforate 10,569' - 10,600'. POOH.
Shots fired.
10/13/2019
**Continued on 10/14/19 WSR**
CTU #9 1.75" coil
**Continued from 10/13/19 WSR** RPM/CBUAdperf
Laydown perf gun #2, ball recovered. Trim 100' pipe. MU & RIH with 31'x 2" PowerJet gun #3.
Perforate 9909'- 9940'. Confirm shots fired, ball recovered. Standby for memory logger. MU & RIH
w/ HES memory cement logging tools. Log up from 10,750'- 8,500' at 35 fumin. Repeat log up from
10,750' - 8,500' at 35 f /min. POOH.
10/14/2019
**Continued on 10/15/19 WSR **
CTU #9 - 1.75" coil
Job Objective: RPM/CBUAdperf
POOH with HES cement bond log toolstring. Download data w/ -11' correction. Trim 100' pipe. MU
and RIH with 31'x 2" Power Jet perf gun #4. Perforate 9334'- 9365'. POOH. Confirm shots fired,
ball recovered. MU & RIH w/ 14' x 2" Power Jet pert gun #5. Perforate 9320'- 9334'. POOH.
Confirm shots fired, ball recovered.
Stand by for TCP personnel.
10/15/2019
** Continued on 10/16/19 WSR **
CTU #9 - 1.75" Coil
Job Objective: RPM/CBUAdperf
MU and RIH with 20'x 2" PowerJet perf gun #6. Perforate interval 9234'- 9254'. POOH. FP well
with 39 bbls 60/40. Confirm shots fired, ball recovered. Blowdown coil with N2. RDMO.
10/16/2019
.**Complete***
LHEAD = FMC 1
JATOR =
ELEV = 533 7• CSG, 29#, �64T <
iLEV = 2931' NT.13CR 80 NSCC,
6970' ID = 6.184'
4ng(e = 108• @ 10580'
n MD = NA 20• COND, 107'
nTVD= 8892'—ss
81.5#, H�10,
D =19.124'
9-5/8' CSG, 40#, L-80 BUTT, D = 8.835' 3809'
Minimum ID = 2.31" @ 7536'
2-718" X NIPPLE IN PTSA
TOP OF 3-12' X }1/4' X 2-7/8' LNR 7532'
13CR4I5 STL, .0087 bpf, ID = 2.992' 7578'
4-12' TBG, 1299, 13CR410 VALI TOP,
0152 bpf, ID = 3.958'
7580'
INTERVAL
CSG, 260, L-80, .0383 bpf, D = 6.276'
8447
SOZ
2-
42'X7- DELTA WHIPSTOCK (0 8570'
i,29#,NT-13CR-90NSCC,ID=6.184'
–8570
3-1/4'LNR6.6#,13CR415TC11,.0079bpf,10=2.85' 9164'
PERFORATION SUMMARY
REF LOG: BHI MWD
ANGLE ATTOP PERF: 70' @ 9234'
Note: Raterto Prodwfion DB for listoriml pertdata
SIZE
SPF
INTERVAL
z
SHOT
SOZ
2-
6
9234-9254
O
10/16119
0
2'
6
9320-9365
O
10/15/19
BK
2'
6
9445-9673
O
0828/19
1 KBG2 SO
2'
6
9909-9940
O
10/14/19
6595
2'
6
10199-10519
O
0828/19
7330
2-
6
10548-10578
O
0828/19
2'
6
10569-10600
O
10/13/19
2-
6
10682 -10702
O
10/13/19
PBTD 10755'
L-00 STL..0058 bpf. ID = 2.441' 1077T
2107 �4-1/2'H6XNP,D=3.8'
PA4I IPTUANnPPI S
ST
MD
TVDDEV
TYPE VLV
LATCH
PORT
DATE
5
2999
2994
5 KBG-2 DMV
BK
0
09/12/112
4
4101
4096
1 KBG DOME
BK
16
09/05119
3
5912
5906
1 KBG2 SO
BK
20
09/05/19
2
6601
6595
1 KBG2 OMY
BK
0
04/09,05
1
7330
7308
20 KBG2 OMY
BK
0
06/06/19
7481'
4-12' HES X NIP, D = 3.813'
75OX
7'X4-12'BKR 8J PKR ID=3.875'
7625'
4-12' KB LTP w/ PTSA (09,05/19)
7532'
3.70'DEPLOY SLV, I0=3.00'
7536'
2-7/
8'X NP,ID=2.31'
7557 3-12' X NP, ID - 2913'
I 7566' 1-14-12' HES XN NP, ID = 3.725•
7578' 3-12' X 33/16• XO, ID = 2.786'
7580' 442' WLEG, ID = 3.958•
7576' ELM TT LOGGED ON 07/30105
IMLLOUT WINDOW (11J7A) 8575'-8583WNDOW (11J7A) 8575'-8583'
9164' 3J116'X 2-718'X0, ID=2.377'
PRUDHOE BAY UNIT
WELL: 1"7A
PERMIT No: 2194M
API No: 50-029-22716-01
SEC 34 T11 N R15E 4029' FEL & 4884' FNL
DATE REV BY COMMENfS DATE REV BY COMMENTS
12101!96 046 ORKUNALCOMPLETION 09/19/19 RC/JMD FINAL ODE APPROVAL
04/10105 0-16 RWO 1024/19 KFMUMD ADPERFS (1011316119)
0628119 N-CDR2 CTD 1137 11/04/19 DD/JMD ADD COND NFO& MISSED ADPEF
09/05/19 JMD DRLG HO CORRECTIONS
09/10/19 MWJMD SET FLOWGAURD LTP w/PTSA & X NP
BP Exploration (Alaska)
09/10119 MWJMD GLV CIO (09105119) 11
BANCER pPdNT DISTRIBUTION LIST
UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME
FIELD
COUNTY
BHI DISTRICT
Prudhoe Bav Unit
PRUDHOE BAY
Alaska
AUTHORIZED BY Dirk Zeijlemaker
EMAIL Dirk.zeiilemaker@bakerhughes.com
2 190 62
31346
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, 1-112-1
) E. Benson Blvd.
:horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE RPM:PNC3D
LOG DATE October 13, 2019
TODAYS DATE October 18, 2019
Revision
STATUS Final Replacement:
No
Details:
Rev. Requested by:
---
COMPANY
FIELD I
FINAL
CD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
ADDRESS(FEDEx WILL NOT DELIVER TO P.O. Box)
LOGS
CGM, Final Surveys)
(Compass)
PERSON ATTENTION
Is OFnPRINTSff
Vr rMIN
OF COPIESn
# OF COPIES
# OF COPIES
n#
I IRP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
.Attn: Ricky Elgarico
ATO 3-344
OCT 2 2 20
700 G Street
Anchorage, AK 99501
AO G C C
3
1 ExxonMobil, Alaska
1
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
1
1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ***
1
Attn: Garret Brown
5.50 West 7th Avenue, Suite 1100
�I
.Anchorage, Alaska 99501
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: David Itter
0
TOTALS FOR THIS PAGE:
0
1
4
0
0
STATE OF ALASKA
'ALASKA OIL AND GAS CONSERVATION COMMISSnN
WELL MPLETION OR RECOMPLETION REPO( 4ND LOG
la. Well Status: Oil IZ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
Development p Exploratory ❑
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
Service ❑ Stretigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
8/29/2019
219-062 •
3. Address:
7. Date Spudded
15. API Number:
P.O. Box 196612 Anchorage, AK 99519.6612
8/14/2019
50-029-22716-01-00
4a. Location of Well (Governments[ Section).
8. Date TD Reached:
16. Well Name and Number:
8/23/2019
PBU 11-37A
9 Ref Elevations KB 53.50 •
17. Field/Pool(s):
Surface: 4628' FSL, 4639' FEL, Sec. 34, T11N, R15E, UM
Top of Productive Interval: 5104' FSL, 5191' FEL, Sec. 34, T11 N, R15E, UM
GL 27.31 r BF 29.31 '
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 1115' FSL, 4433' FEL, Sec. 27, T11N, R15E, UM -
10755' / 8683' •
ADL 028325 •
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11, Total Depth (MDITVD):
19. DNR Approval Number:
Surface: x- 708213 y- 5951091 Zone - ASP 4
10775'/ 8678'
70-054
12. SSSV Depth (MD/TVD).
40 Thickness of Permafrost MDRVD:
TPI: x- 707647 y- 5951552 Zone - ASP 4
Total Depth: x- 708366 y- 5952863 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes m (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
NIA (ft MSL)
21, Re-drill/Lateral Top Window
MDfrVD:
8575'/ 8477'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, GR/CCL/RPM
23. CASING, LINER AND CEMENTING RECORD
CASING
Wf. PER
FT
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM
TOP
BOTTOM
20"
91.5#MH4027'107'
27'
107'
30"260
sx Arctic Set (Approx.)
9-5/g•
47#3809'
26'
3803'
12-1/4"
2231 sx CS III, 335 sx Class'G'
7"
26#/29#
8575'
25'
8477'
8-1/2"
320 sx Class'G'
3-1/2"x3-1/4'
9.3#/6.6#10773'
7491'
8679'
4-1/8"
227 sx Class'G'
x2-7/8"
/6.5#
24. Open to production or injection? Yes IZ No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/iVD of Top and Bottom; Perforation
GRADE DEPTH SET (MD) PACKER SET (MD/TV
Size and Number; Date Perftl):
4-1/2" 12.6# 13Cr80 7580' 7502' / 7489'
2" Gun Diameter, 6 spf 8/28/2019
9445'-9673' 8768'-8773'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10199'- 10519' 8772' - 8752'
Was hydraulic fracturing used during completion? Yes ❑ No IZ
Per 20 AAC 25.283 (i)(2) attach electronic and printed
10548' - 10578' 6745'- 8736'
COMPLETION
information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
(l•',
VERIFIED
2500' Freeze protect w/ 40 Bbls Diesel, 5 Bible Meth
27. PRODUCTION TEST
Date First Production: September 7, 2019
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date M Test: W7119
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Sine
Gas -Oil Ratio:
12
Test Pedod -►
193
353
1375
90
1833
Flow Tubing 0
Casino Press:
Calculated
Oil -Bbl:
Gas -MCF:
Water-Blik
Oil Gravity - API(com.
Press
1460
24 Hour Rate -.►
385
706_
2749
WA
Form 10407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
�4 a -tl%- SEP 2 4 2019
P-
���9/5
28. CORE DATA Conventional Cores) Yes ❑ NO 0 Sidewall Cores Yes ❑ No R1
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize nrnology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost -Top
Well Tested? Yes ❑ No m
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
separate sheets to this form, if needed, and submit detailed test information per 20
Top of Productive Interval
9184'
8700'
AAC 25.071.
42SB - Zone 4A
8637'
8534' r
CGL -Zone 3
8689'
8575'
Base of CGL - Zone 2C
8845'
8631'
23SB - Zone 28
9184'
8700'
21 TS - Zone 2A
9355'
8753' f
Zone 2B (Invert) 1
10577'
8736'
Formation at total tlepth:
1
Zone 28 (From Base)
10577'
8736'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Surveys, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and cored to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R
Contact Email: Ryan.Ciolkosz@bp.com
Authorized Title: IM)Necialist rV7N
Authorized Signature: Date: O ' F� I Contact Phone: +1 907 564 5977
INSTRUCTIONS
General: This form is designed for submitting mplete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a wall schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 41b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this we11 is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate forth for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the coresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 512017 Submit ORIGINAL Only
TRFF =
WELLHEAD =
FMC
ACTUATOR=
7580'
KB. ELEV =
54'
REF ELEV =
53.5'
BF. ELEV =
29.31'
KOP =
6970
Max Arole =
108*R 0580'
Dabm MD =
NA
DatmTVD=
8800'SS
7' CSG, 290,
Ni ;=8,o NSCC, I
D =6.184'
_—#, CONJl1CiOR, —�
0-
-5/8' CSG, 400, L-80 BUR, D = 8.835' 3809'
iMinimum ID = 2.31" I@ 7536'
12-7/8" X NIPPLE IN PTSA
[TOP OF 3-12' X 3-19'X 2 -Ire' LNR I
1312' W R, 9.30,13CR45 STL, _0087 bpf, D =2.992' 757W
REF LOG: BHI MWD
1.4-12' TBG, 12 .60, 13CR410 VAM 7OP,
0152 bpL ID = 3.958'
7580'
SIZE
7' CSG, 260, L-80, .0383 bpf, D = 6.276' 8447'
1442-X 7- DELTA WHIPSTOCK (08102119)
7- CSG, 290, NT-13CR-40 NSCC, D = 6.184'
51!14
PERFORATION SUMMARY
REF LOG: BHI MWD
ANGLE AT TOP PERF: 81' @ 9445'
Note: Rehr to Production DB for historical perfdata
SIZE
SPF
INTERVAL
NS z
SHOT
I SOZ
2-
6
9445-9673
O
0828/19
09)12111
2-
6
10199-10519
O
0828/19
BK
2-
6
10548 -10578
O
0828/19
1
L-80 STL, .0058 bpf, D =
11-37A SA�=TYNOTES: WELL ANGLE >70'@8750' "
M. )OGLEG: 38' @ 8745"" CHROME TBG, LNR,
21OT 4-12'HESX NP,D=3.813'
r_ee , icr ueunaF� s
ST
MO
TVD
DEV
TYPE VLV
LATCH
PORT
DATE
5
2999
2994
5
KBG-2 DMY
BK
0
09)12111
4
4101
4098
1
KBG-2 DOME
BK
16
09/05/19
3
5912
5906
1
KBG-2 SO
BK
20
09/05/19
2
6601
6595
1
KBG-2 DMY
BK
0
04109105
1
7330
7308
20
KBG-2 DMY
BK
0
06/06/19
7481' --j4-12-HESXNP,ID=3.813'
7802' 7'X4-12-BKRS-3PKR,D=3.87
7626' 4-12" KB LTP W/ PTSA (09105119)
7632' 3.70' DEPLOY SLV, D=3.00'
7636' zare•xNP,D=zar
755T 3.12'XNP,ID=2.813'
7568'j4-12'HESXNNP,ID=3.725'
7578' 3-12' X 3-W16' XO, ID =2.786'
7580' 442'WLEG,ID=3.958'
7676 ELM TT LOGGED ON 07/30105
MLLOUT WNDOW (11-37A) 8575' -8583'
9184' 3 -W6 -X 2-7W XO, ID=2.37T
DATE
REV BY COMMENTS DATE I REV BY COMMENTS
12)01)96
046 ORIMALCOMPLETION 09119/19 RC/JMD FNALODEAPPROVAL
04110105
D-16 RWO
0WAM9 WCOR2 CTO (11-37A)
09/05/19
JMD DRUG HO CORRECTIONS
09/10/19
MHIJMD SET FLOWCAURD LTP W)PTSA & X NP
09/10/19
MWJMD GLV C/O (09/05/19)
PRUDHOE BAY UNIT
WELL: 11-37A
PERMIT No: 219-062
API No: 50-029-22716-01
T71 N, R75E, 4029' FEL & 488
BP Exploration (Alaska)
North America - ALASKA - Blo
Operation Summary Report
Page 1 of 22
Common Well Name'. 11-37 AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 8/20/2019 End Date. 8/24/2019 H-S4DW0019G5-EX-01-RN-(1,907,271,00)
Project: PBU Site: 11 -
Rig Name/No.: CDR -2 Spud DateRme: 11!//1998 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB Q53.50usft (above Mean Sea Level)
BPUOI: USA00001243
Date From - To
Hrs
Task Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)_
8/12/2019 07:00 - 13:30
8.50
MOB P
PRE PREJOB SAFETYMEETING WITH CREWAND
TRUCK DRIVERS.
- EMPHASIS ON GOOD COMMUNICATION,
VERIFY STOP COMMAND.
- STOP BLOCK IN PLACE TO PREVENT RIG
FROM ROLLING BACKWARDS INTO WELL.
- TREE & CASING VALVES ON TREE SHUT IN.
IA, OA AND ODA PRESSURES = 0/2010 PSI
- DRILL SITE OPERATOR NOTIFIED AND
DECLINED WITNESSING RIG MOVE OFF OF
WELL.
- ANYONE CAN STOP THE JOB ATANYTIME.
BE WATCHFUL
MOVE PITS AND RIG MODULE OFF WELLAND
MOVE TO 11-37A
- SPOT MAIN SUB
'- REMOVE SOW, INSTALL THE CRAWLER AND
SPOT RIG OVER WELL
MOVE PITSAND SPOT UP TO MAIN SUB
13:30 - 00:00
10.50
MOB P
PRE RIG IS SPOTTED BUT NOT ACCEPTED,
NABORS HAS REQUESTED TIME TO
REPLACE THE LOWER CHAIN SPROCKETS IN
BETWEEN WELLS AND THE REQUEST WAS
GRANTED. THE RIG WILL BE ACCEPTED
WHEN THE INJECTOR WORK IS COMPLETED
- INJECTOR MAINTENANCE
- LTT BOTH MASTERS AND SWAB VALVES TO
3500#
- SERVICE TREE VALVES
- HOOK UP MPD LINE
_
- COMPLETE RIG UP CHECKLIST
8/13/2019 0000 - 01:00
1.00
MOB P
PRE INJECTOR MAINTENANCE
COMPLETE INJECTOR MAINTENANCE AND
OPERATE INJECTOR
- INSTALLCOIL CONNECTOR
-PULLTESTTO 50K
- REHEAD BHI UQC
" RIG ACCEPT @ 00:00 HRS" _
01:00 - 05:30
4.50
BOPSUR P
PRE NU BOP'S
- PJSM
- "HOLD RIG EVAC DRILL- 3 MIN 14 SEC TO
MUSTER "
- LTT PERFORMED EARLIER
- REMOVE TREE CAP
-INSTALL BOPS
- INSTALL INJECTOR AND CHECK TREE
BOLTS _
05:30 - 07:00
1.50
BOPSUR P
PRE PREP TO TEST BOPE
- PURGE ALL SURFACE LINES AND COIL WITH
FRESH WATER
- PUMP 2 DISCHARGE PUMP CAP IS LEAKING,
BLEED OFF AND TIGHTEN
- SHELLTEST IS GOOD
Printed 9/19/2019 10:01:37AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 11-37
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 8/20/2019 End Date: 8/24/2019
Project: PBU Site: 11
Rig Name/No.: CDR -2 Spud Date/Time: 11/7/1996 12:00 OOAM
Rig Contractor: NABORSALASKA DRILLING INC.
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
_ (hr) _Waft)
07:00 - 13:30 6 _ .50 BOPSUR P PRE
13:30 - 17:15 3.75 BOPSUR P
17:15 - 1915 2.00
19:15 - 20:15 1.00
KILLW P
STWHIP P
8,570.00
PRE
PRE
8,570.00 WEXIT
Printed 9/19/2019 10 01 37AM •'AO depths reported in Drillers Depths"
Page 2 of 22
AFE No
H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
BPUOI:
Description of Operations
TEST BOPE AS PER AOGCC AND BP
GUIDELINES.
ALL TESTS TO 250 / 3500 PSI.
TEST WITNESS BY WSL AND TOOLP ISHER.
WAIVED BY AOGCC REP LOU LAUBENSTEIN
TEST 1: IRV, STRIPPER, C9, CIO
BACKWARDS - PASS
TEST 2: BLIND/ SHEARS, R1, BL1A, 81, 84
R1 - PASS HAD TO REPURGE SURFACE LINES
TEST 3: ANNULAR (2-3/6), TIW#1, B3, B2,
BL1-PASS
TEST 4: UPPER 2-3/8" PIPE / SLIP, TI W #2,
1312, R2, T2, C15 - PASS
TEST 5: CIS, T1, C11 - PASS
TEST 6: VARIABLES (2-3/8"), C7, C9, CIO, TV2 -
FAIL, GREASE VALVES 7,9 & 10 RETEST -
PASS
TEST 7: LOWER 2-3/8" PIPE / SLIP, C5, C6, Ce,
TV1-PASS
TEST 8: CHOKE A, CHOKE C - PASS
PERFORM ACCUMULATOR DRAW DOWN
TEST
INSTALL SAVER SUB
TEST 9: ANNULAR (3-1/2') Cl, C4- PASS
TEST 10: VARIABLES (3-1/2') C2, C3 - PASS
BOP TEST COMPLETED - TEST 6 WAS A
FAIL/RASS, REGREASE ALL 3 VALVES &
PASSED
- RD TEST EQUIPMENT
- GREASE KILL & CHOKE LINE VALVES AND
CHOKE MANIFOLD
- SWAP OUT LUBRICATOR AND GET RKUS
- INSTALL BHI FLOATS, TEST BODY 250/4700
THEN FLOATS TO 3500 PSI
- GOOD PT, STAB ON AND DISPLACE COIL TO
MUD
-PT LUBRICATOR
WELL KILL OPS
- GOOD PT, LINE UP TO BULLHEAD KILL WELL
- ONLINE WITH METHANOL TO THE TT
- CLOSE SWAB, OPEN WELL TO A CLOSED
CHOKE
- WHP=2331 PSI, ONLINE WITH 10 BBLS OF
METH, 290 BBLS OF KCL, 10 BBLS HVP, 146
BBLS OF MUD
- MAX PRESSURE AT BREAKOVER (9? 5 BPM
2780 PSI (55 BBLS OF KCL) IA 700
- FINAL INJECTION PRESSURE @ 5 BPM 1946
- PURGE INJECTOR TO TIGER TANK
- REDUCE RATE TO 1 BPM TAKING RETURNS
TO THE THE TIGER TANK (10 BBLS)
-BRING RETURNS INSIDE WITH AI FOR 1
CIRCULATION
- 10 MIN FLOW CHECKAT THE ROTARY -
GOOD NO FLOW
- INJECTOR OFF @ 19:15 HRS _
MU WINDOW MILLING BHA
- PJSM
-MU MILLING BHA
- INJECTOR ON @ 20:00 HRS
- PT QTS TO 3500#
North Arnerica -ALASKA - BP
Operation Summary Report
Page 3 of 22
Printed 9/19/2019 10:01:37AM "All depths reported in Drillers Depths"
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 8/20/2019 End Date: 8/24/2019
H-S4DW0019G5-EX-DI-RN-(1,907,271.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud DateTme: 11(7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Dale From - To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr) _
_ (usft)
_
00:00 3.75
STWHIP P 8,570.00 WEXIT
RIH WITH MILLING BHA
- RATE BPM 0.52 IN 0.87 OUT CIRC
PRESSURE 1152
=' HELD A D1 KWT DRILL" 1 MIN 2 SECS TO
SECURE THE WELL
- TIE IN FROM 8290' TO 8357' (NO
CORRECTION REQUIRED)
_-RIH
TO 8460' _
8/14/2019 00:00 - 01:30 1.50
STWHIP P 8,575.00 WEXIT
RIH 7O 8563
-RATE BPM 0.521N 0.67 OUT CIRC
PRESSURE 1152
'- MUD WEIGHT IN 8.5 PPG OUT 7.7 PPG
- TAKE RETURNS TO THE TIGER TANK
j
- BRING RETURN BACK INSIDE
-PU 43 SO 27
-RATE BPM IN 1.0 OUT to
- MUD WEIGHT IN 8.5 PPG OUT 8.5 PPG
- RIH AND LIGHTLY TAG PINCH POINT a 8575'
- OBSERVE NO FLOW AT THE SHAKERS
WHILE CLOSING EDC
01:30 - 1600 14.50
STWHIP P 8,57700 WEXIT
MILL 3.72" WINDOW PER BAKER REP FROM
8575' MD TO 8580.5' MD
.-RATE: 2.79 BPM IN, 2.78 BPM OUT
'-MUD WEIGHT: 8.59 PPG IN, 8.55 PPG OUT
-DWOB:1-4 KLBS
- FREE SPIN 2700 PSI ON BTM 2670 PSI
- LOOKS LIKE WE POPPED OUT AT 8580.5'
(5.5' WINDOW), WOB DROPPED OFF TO IK
AND CONTINUING TO FALL OFF
- CALL ODE LET HIM KNOW BUT WE AE STILL
GOING TO TIME MILLAS PER PLAN FOR AN 8'
WINDOW
',- 8583' AT 8' START MILLING RAT HOLE
- 8584.6 (WOB AT 3A9K)
'- 8586.7 WOB DROPPED OFF TO 1.5K
- MILLED RAT HOLE TO 8594', START
REAMING PASSES
- REAM PASSES LOOK GOOD, DRY DRIFT
16:00 - 21:30 5.50
STWHIP P 8,594.00 WEXIT
TRIPPING OPS
-DRY DRIFT IS CLEAN, FLOW CHECKAND
OPEN EDC
- GOOD NO FLOW, POOH AT MAX RATE
-PERFORM 10 MIN FLOW CHECK. WELL
STATIC
- LAY DOWN WINDOW MILLING BHA,
WINDOW MILL TIGHT 3.71"GO / 3.70" NOGG,
REAMER 3.72" GO 13.71" NOGO
21:30 - 00:00 2.50
DRILL P 8,594.00 PROD?
RIH WITH 4-1/8" DRILLING BHA #3
- RATE: 0.69 BPM IN, 0.92 BPM OUT. CIRC
PRESSURE: 826 PSI
MUD WEIGHT: 8.51 PPG IN, 8.54 PPG OUT
280'[LOG DOWN FOR TIE-IN FROM 8240' TO a280 -
[MID
MD(FORMATION) WITH -5' CORRECTION
(FORMATION)
Printed 9/19/2019 10:01:37AM "All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Page 4 of 22
Common Well Name: 11-37
- FREE SPIN: 3071 PSI, 2.80 BPM
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 8/20/2019
End Date: 8/24/2019
H-S4DW0019G5-EX-D1-RN-(1,907,271.00)
Project PBU
Site: 11
- ROP: 20-50 FT/HR, WOB: 1.0 — 2.5 KLBS
Rig Name/No.: CDR -2
Spud Date/rime: 11!7/1996 12:00:011AM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
HI VIS _
0600 - 0930 3.50 DRILL P 8,800.00
BPUOI: USA00001243
Active datum: KB @53.50usfl (above Mean Sea Level)
- BUILD LANDED, PUMP SWEEPS OUT
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
lush)
_
8/15/2019 00:00 - 06:00 6.00
DRILL P
8,800.00 PROD1
DRILL 4-118' BUILD
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"
- FREE SPIN: 3071 PSI, 2.80 BPM
- RATE: 2.82 BPM IN, 2.84 BPM OUT. CIRC
PRESSURE: 3071 — 3306PSI
- MUD WEIGHT: 8.60 PPG IN, 8.57 PPG OUT,
ECD: 10.00 PPG AT WINDOW
- ROP: 20-50 FT/HR, WOB: 1.0 — 2.5 KLBS
'- PERFORM 100'BHA WIPER
-LAND BUILD AT 8800' MD. PUMP 10/ 10 LO /
HI VIS _
0600 - 0930 3.50 DRILL P 8,800.00
PROD1 TRIPPING & BHA HANDLING OPS
- BUILD LANDED, PUMP SWEEPS OUT
- DYNAMIC FLOW CHECK AND POOH TO THE
WINDOW
- OPEN EDC AND POOH AT MAX RATE
- HOLDING 10.0 PPG AT THE WINDOW
- FLOW CHECK AT SURFACE, LOST 4 BBLS
DURING TOOH
-GOOD NO FLOW, PU THE INJECTOR AND LD
THEBHA
_'-INJECTOR OFF AT 8:35 _
09:30 - 17:00 7.50 DRILL P 8,800.00
PRODt TRIPPING OPS
- MU LATERAL BHA WITH STRIDER TOOL
- INJECTOR ON AT 10:05
- SHALLOW TEST STRIDER AT SURFACE 2.56
BPM AT 3126 PSI VIBRATION AT 2-3,2.85 BPM
AT 3671 PSI VIBRATION AT 4-5 ON THE BHI
SCREEN
- SHUT PUMPS OFF, OPEN EDC AND RIR
PUMPING
- LOG TIE IN WITH -10' CORRECTION
- PUH TO LOG CCL FOR TOL PLACEMENT
- SHALLOW TEST STRIDER ABOVE WINDOW
3167 PSI AT 2.5 BPM VIBRATION = 5, 3670 AT
2.85 BPM VIBRATION =6
- RIH TO CONTINUE DRILLING
-TAG AT 8771', PU, RIH AND TAGGED AT SAME
DEPTH AGAIN
- SEVERAL ATTEMPTS TO GET PAST 8771'
FAILED, CALL ODE AND SUGGEST PUH TO
LOG THE RA TO MAKE SURE WE ARE ON
DEPTH
- POOH AND LOG RA
-CORRECT DEPTH+30', WE WERE TAGGING
TD, PUH AND RELOG CCL
- RELOG SHOWS THE FIRST LOG IS FALLING
BEHIND, RIH TO RA MARKER AND WE ARE ON
DEPTH
- RIH TO To AND TAG ON _N DEPTH
17:00 - 0000 7.00 DRILL P 9,210.00
PRODi DRILL 4-118" LATERAL
- FREE SPIN: 3217 PSI, 2.67 BPM
- RATE: 2.67 BPM IN, 2.70 BPM OUT. CIRC
PRESSURE: 3217-3671 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.60 PPG OUT,
ECD: 10.00 PPG
- ROP: 80-100 FT/HR, WOB: 1.7 —2.3 KLBS
-PRESSURES EVERY TIME WE COME OFF
PUMP AND BACK ON CHANGING.
- DIFFERENTIAL RUNNING HIGH. 1500 PSI
FREE SPIN DIFFERENTIAL
- ROP SLOWED WHILE COMING INTO 24N
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
North America - ALASKA - BP Page 5 of 22
Operation Summary Report
Start Date: 8/20/2019 End Date: 8/24/2019
Site: 11
Spud Date/Time: 11/7/1996 12:00:OOAM
AFE No
(11,907,271.00)
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean See Level)
Date From - To Firs Task
Code NPT Total Depth Phase Description of Operations
(hr) _
_(usft)
8/16/2019 00:00 - 01:00 1.00 DRILL
P 9,250.00 PROD1 FINISH DRILLING TO 9250'
HAVING TO BRING RATE DOWN DO TO
DIFFERENTIALAT MOTOR CLIMBING
01:00 - 0230 1.50 DRILL
_
P 9,250.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW
- RATE: 2.64 BPM IN, 2.45 BPM OUT. CIRC
PRESSURE: 3992 PSI
-PUMPED SWEEPS. DIFFERENTIAL
j PRESSURE SPIKED TO 2000-2100#.
DECREASE RATE TO 2.36 BPM TO KEEP
PUMP PRESSURE BELOW 4500#.
- APPEARS STRIDER TOOL LOCKED IN
CLOSED POSITION.
- DISCUSS WITH ODE. PREPARE TO PULL
j
OUT OF HOLE FOR AGITATOR.
- WIPER TO WINDOW. PERFORM 200' JOG.
PULL THROUGH WINDOW WITHOUT ISSUE.
- OPEN EDC, BRING RATE UP TO 4.4 BPM.
JET WHIPSTOCK TRAY AND 7"
_ - PERFORM DYNAMIC FLOW CHECK.
0230 - 0930 7.00 DRILL
N 9,250.00 PROD? POOH FOR TOOL FAILURE
PERFORM SHALLOW TEST.
LD THE BHA
- BIT GRADE = 2-1, SAME AS THE LAST BIT,
SAME EXACTAND ONLY CUTTER IS
BROKEN???
- MU THE BHA
- INJECTOR ON 06:15
-
- SHALLOW TEST AGITATOR 2.5 BPM AT 2775
PSI 2.898PMAT3310PSI
-SHUTDOWN PUMPAND OPEN THE EDC
AND RIH
- LOG TIE IN, CORRECT -11' (VERIFY WITH WS
RA WEAR_E STILL ON DEPTH). _
09:30 - 19:30 10.00 DRILL
P 9,250.00 PROD? DRILL 4-1/8" LATERAL
- TAG AT MIN RATE ON DEPTH, PU, GET
PARAMETERS AND START DRILLING
- FREE SPIN: 3350 PSI, 2.80 BPM
- RATE: 2.80 BPM IN, 2.82 BPM OUT. CIRC
PRESSURE: 3350-3671 PSI
- MUD WEIGHT: 8.66 PPG IN, 8.60 PPG OUT,
ECD: 10.02 PPG
-ROP:80-140FT/HR,WOB: 1.5-2.6KLBS
-PERFORM BHA WIPERS EVERY 100'
_ DRILLED, PU'S ARE CLEAN_ _
19:30 - 22:00 2,50 DRILL
P 9,640.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW
- RATE: 2.85 BPM IN, 2.65 BPM OUT. CIRC
PRESSURE: 3622 PSI
- PUMPED 10 BELS LOVIS / 10 BBLS HIVIS.
NOTHING SIGNIFICANT BROUGHT UP.
- OPEN EDC AT WINDOW. JET TRAY AT 4.5
BPM. CHASE UP THROUGH 7" TO TUBING
TAIL.
- LOG DOWN FOR TIE-IN FROM 8260'
(FORMATION) WITH +2' CORRECTION
- CLOSE EDC. RIH AT MINIMUM RATE. SET
DOWN AT 9219' (24N) VERIFY AS DRILLED.
HAD TO BRING PUMP RATE UP TO 1 BPM.
- DROP RATE TO MINIMUM. SET DOWN AT
9289' MULTIPLE TIME. HAD TO BRING TO
DRILLING RATE TO MAKE IT THROUGH.
- INCREASE ECD TO 10.3 PPG AT WINDOW
- RUN CLEANLY TO BOTTOM
Printed 9/19/2019 10:01:37AM **Ali depths reported in Drillers Depths"
Printed 9/192019 10o1:37AM **All depths reported in Drillers Depths"
North America - ALASKA -
BP
Page 6 of 22
Operation Summary Report
Common Well Name. 11-37
AFE No
Event Type: RE -ENTER -ONSHORE (RON)
Start Date: 820/2019 End Date: 8/24/2019
H-S4DW0019G5-EX-D1-RN-(1,907,271.00 )
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud DatefTlme: 11/7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI. USA00001243
Active datum: KB @53.50usR (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth
Phase
Description of Operations
(hr) ..
_. (usR)
--_
22:00 - 00:00 2.00
DRILL PJ 9,715.00
PROD1
DRILL 4-1/8" LATERAL
- FREE SPIN: 3611 PSI, 2.87 BPM
- RATE: 2.87 BPM IN, 2.92 BPM OUT. CIRC
PRESSURE: 3611 -3791 PSI
'- MUD WEIGHT: 8.72 PPG IN, 8.64 PPG OUT,
ECD: 10.30 PPG
_
-ROP: 40-60 FT/HR, WOB. 2.0-2.6 KLBS__
8/17/2019 00:00 - 15'.30 15.50
DRILL P 9,880.00
PROD?
DRILL 4-1/8" LATERAL
- FREE SPIN: 3677 PSI, 2.85 BPM
- RATE: 2.84 BPM IN, 2.87 BPM OUT. CIRC
PRESSURE: 3677-3805 PSI
- MUD WEIGHT: 8.75 PPG IN, 8.69 PPG OUT,
ECD: 10.3 PPG
-ROP: 20-40 FT/HR, WOB: 3.0-4.2 KLBS
- DRILLED INTO THE 22N SHALE AT 9875'8714'
TVD, TURN DOWN AT 9930' AND DROP TO
i8719'TVD
- NOTABLE TO DROP ANGLE, REDUCE PUMP
RATE AND STACK Wi
- STILL NOT DROPPING DOWN IN ANGLE,
REDUCE RATE TO 2 BPM
- STARTING TO SEE A DROP IN NEAR BIT BUT
THEN GETTING PUSHED UP AGAIN
- DROPPED OUT OF THE 22N AT -10,090'215'
OF SHALE
15'.30 - 18'.00 250
_
DRILL P 10,180.00
PROD?
WIPER TRIP TO WINDOW
- JOG IN HOLE AT THE WINDOW
- PULL THROUGH WINDOWAND OPEN EDC
- POOH TO THE TT CHASING LOW 8 HI -VIS
PILLS
1800 - 19:00 1.00
DRILL P 10,180.00
PROD?
CLOSE EDC, RUN TO BOTTOM
- 0.42 BPM IN RATE / 0.53 BPM OUT
- OSK BOBBLE AT 9340'
- SAT DOWN AT 9387'. PU CLEAN, INCREASE
RATE TO 1.0 BPM. GO BY WITHOUT ISSUE
- DROP RATE BACK TO MIN RATE, RUN TO
BOTTOM.
19.00 - 19:30 0.50
_
DRILL P 10,218.00
PROD?
DRILL 4-118" LATERAL
- FREE SPIN: 3750 PSI, 2.77 BPM
- RATE: 2.77 BPM IN, 2.81 BPM OUT, CIRC
PRESSURE: 3750-3939 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.76 PPG OUT,
ECD10.31 PPG
- ROP: 60-70 FT/HR, WOB: 2.5 - 3.2KLBS
1930. - 2000 0.50
DRILL P 10,29200
PROD?
DECREASE RATE/INCREASE WOB TO
ASSIST IN BUILDING ANGLE
DRILL 4-1/8" LATERAL
- FREE SPIN: 3245 PSI, 2.51 BPM
- RATE: 2.57 BPM IN, 2. BPM OUT. CIRC
PRESSURE: 3245- PSI
- MUD WEIGHT: 8.82 PPG IN, 8.76 PPG OUT,
ECD: 10.31 PPG
- ROP: 30 FT/HR, WOB: 2.5 - 3.2KLBS
Printed 9/192019 10o1:37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/202019 End Date: 9/24/2019
Project: PBU Site: 11
Page 7 of 22
AFE No
+S4DW0019G5-EX-D1-RN- (1,907,271.00)
Rig Name/No.: CDR -2 Spud Date/Tlme. 11(7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Hrs Task
Code NPT Total Depth Phase
Description of Operations
(hr)
lusft)
2000 - 00:00 4.00 DRILL
P 10,329.00 PROD?
DRILL 4-1/8" LATERAL
- FREE SPIN: 3750 PSI, 2.77 BPM
- RATE: 2.72 BPM IN, 212 BPM OUT. CIRC
PRESSURE: 3750-3966 PSI
- MUD WEIGHT: 8.85 PPG IN, 8.76 PPG OUT,
ECD: 10.31 PPG
- ROP: 20-30 FT/HR, WOB: 2.5 — 4.SKLBS
-SLOWDRILLING. GOODWEIGHT
TRANSFER. TAKING MORE AND MORE
WEIGHT ON BIT TO GET MOTOR WORK.
8/18/2019 0000 - 0200 2.00 DRILL
P 10,378.00 PROW
DRILL 4-1/8' LATERAL
'- FREE SPIN: 3914 PSI, 2.91 BPM
,- RATE: 2.91 BPM IN, 2.93 BPM OUT. CIRC
PRESSURE: 3914-4065 PSI
- MUD WEIGHT: 8.84 PPG IN, 8.75 PPG OUT,
ECO: 10.30 PPG
- ROP: 15-20FT/HR, WOB: 4.5 — S.OKLBS
- MAKING MULTIPLE ATTEMPTS TO IMPROVE
DRILLING. RUN INTO BOTTOM TRYING TO
SEE SOME MOTOR WORK RESPONSE. VERY
LITTLE MOTOR WORK, SUSPECT BIT IS
WORN OUT. PREP TO SWAP WELL TO 9.8
PPG FOR BIT TRIP.
02:00 - 03:30 1.50 DRILL P 10,378.00 PROD? PERFORM 10 MIN DYNAMIC FLOW CHECK.
GOOD FLOW CHECK
- POOH FOR BIT
- 2.96 BPM IN RATE / 2.81 BPM OUT RATE
-9.75 PPG IN /8.75 PPG OUT
- LAY IN 9.8 PPG FLUID FROM 9750'
- 2K OF DRAG COMING THROUGH SUMP.
- PERFORM 1 00'JOG AT WINDOW.
- PULL THROUGH WINDOW WITHOUT ISSUE.
Printed 9/192019 10:01:37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE (RON) I Start Date: 8/20/2019 End Date: 8/2412019
Project: PBUI Site: 11
Rig Name/No.: CDR -2 Spud DateTme: 11/7/1996 12:00:1
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.50usft (above Mean Sea Level
Date From - To Firs Task Code NPT Total Depth Phase
(hr) _ _ (usft)_
03:30 - 12:00 8.50 DRILL P 10,378.00 PROD1
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths—
AFE No
Page 8 of 22
9G5 -EX -DI -RN- (1,907,271.00)
BPUOI: USA00001243
Description of Operations
POOH
- 2.71 BPM RATE IN 12.40 BPM RATE OUT
- 9.84 PPG IN / 9.81 PPG OUT
- SHALLOW TEST AGITATOR, 2.5 BPM AT 3000
I PSI AND 2.83 BPM AT 3500 PSI, AGITATOR
WORKING GOOD AT BOTH RATES
-FLOW CHECK WELL
GOOD NO FLOW, PU INJECTOR AND
INSPECT LAST 100' OF COIL FOR WEAR
- INJECTOR OFF AT 06:15
PULL BHATO THE BIT, BIT RUNG OUT
GRADE = 5-1 RO BT
- INJECTOR ON AT 06:45, RIH DISPLACING
COIL TO 8.6 MUD
- TIE IN, CORRECT DEPTH -10', CLOSE EDC
AND RIH
- INCREASE RATE BETWEEN SHALES TO
DISPLACE 9.8 KWF OUT OF THE WELL
MAINTAINING 00.5 ECD AT THE TOOL AND
>10.2 AT THE WINDOW
- WT CHANGES 0.6 TO 2.27K WOB AT - 9190,
9211, 9372, 9616, 9882, 10323 NO SET DOWNS
JUST WT CHANGES
- AT DRILLING RATE WITH ECD'S IN RANGE,
RIH TO CONTINUE DRILLING
- TAG AT 10350', NO MOTOR WORK
- SHUT DOWN PUMP AND PU, RIH TAG AGAIN
AT MIN RATE
- PU ABOVE 10300 (START OF SHALE) RIH AT
MIN RATE
TAG AT 10322, PU, INCREASE RATE TO 1.0
BPM, RIH TAG AT SAME DEPTH A LITTLE
INCREASE IN MOTOR WORK
- PU ABOVE SHALE
- CALL WOS AND ODE AND DISCUSS HAVING
TO WORK OUR WAY DOWN AT RATE TO
CLEAN UP THE WELL
- WOS & ODE AGREE, START WORKING
DOWN AT 10315' AT 5 FPM
- SEE A LITTLE MOTOR WORK AT 10320 THEN
CLEANED UP, STALLAT 10326'
- PU AND WORK DOWN AT 3 FPM, MADE IT
PAST WITH A LITTLE MOTOR WORK
- SET DOWN AT 10346 WITH A STALL, PU AND
WORK DOWN STARTING AT 10344'
-TAG BOTTOM, CLEANED UP THE
WELLBORE, CONTINUE DRILLING OPS
- STALL 10377, PU AND RESTART, BRING
PUMPS UP AND STALLING OR PACKING OFF,
PU IS CLEAN PU ABOVE SHALE TO 10275
- RIH TAG AT 10320, REDUCE PUMP TO MIN
RATE AND PU, RIH AND TAG AT 10318, PU AND
WORK DOWN SLOW AT RATE
- CLEAN TO TD, DRILLAHEAD, WATCHING
ANNULAR PRESSURE, SHALE AT 10320
MIGHT BE SLOUGHING OFF ON US
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE(RON) Start Dale: 8/20/2019 End Date:
Project: Pau Site: 11
Rig Name/No.: CDR -2 Spud Dalemme: 11!7/1996 12:00:00AM
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
(hr) _ (usft)
12:00 - 17:00 5.00 DRILL P 10,421.00
1700 - 1930 2.50 DRILL
10,378.00
Page 9 of 22
AFE No
H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
BPUOI: USAD0001243
Phase Description of Operations
PROD1 DRILLING OPS DRILL 4-i/8° LATERAL
- FREE SPIN: 3772 PSI, 2.72 BPM
- RATE: 2.76 BPM IN, 2.80 BPM OUT. CIRC
PRESSURE: 3887— PSI
— MUD WEIGHT: 8.84 PPG IN, 8.81 PPG OUT,
ECD: 10.28 PPG
- ROP: 70-140 FT/HR, WOB: 2.5-3.2KLBS
- DRILLED TO 10421, LOST DIFFERENTIAL, PU
AND STARTED PACKING OFF, REDUCE PUMP
RATE AND CONTINUE PUH
- PULLED TO 10250 WITH 10K OVER PULLS,
BRING PUMPS UP AND RIH SLOW, PACKING
OFF, REDUCE RATE AND PUH
- 10250 ONLINE WITH PUMP TO CIRC OUT
THE HI -VIS PILL IN THE COIL
- 10215 PACKING OFF AGAIN, REDUCE PUMP
TO MIN RATE WHILE PUH SLOW
- 9770' PACKING OFF AND PULLING HEAVY,
REDUCE PUMP TO MIN RATE, PULLING
CLEAN, ONLINE WITH PUMP
- 9674 PULLING HEAVYAND PACKING OFF,
REDUCE PUMP, RIH AND POPPED FREE
- PU AND PULL HEAVYAT 9660', RIH AND
POPPED FREE, INCREASE RATE AND PUH
- 9602 PULL HEAVY AT THE BIT, PULLED
THROUGH
- 9219 PULL -6K WOBAND PULLED THROUGH
- JOG IN HOLE AT THE WINDOW, PULL
THROUGH AT 0.5 BPM
- OPEN EDC AND PUMP AT MAX RATE, RIH TO
8660' WITH EDC OPEN PUMPING PILLS
- BOTTOMS UP FROM THE WS IS UNLOADING
A LOT OF LARGE GRAINY SAND a SHALE,
PUMP ANOTHER SET OF PILLS AND CIRC
UNTIL CLEAN
- 2ND SET OF PILLS IS CLEAN, LOG TIE IN
- DISCUSS PLAN FORWARD WITH TEAM NOW
THAT WE KNOW WHAT WE ARE DEALING
WITH. BASED ON GEO DATA, THE SHALE
THAT IS SLOUGHING IS VERY THIN (3') AND
SHOULD CLEAN UP. DECISION MADE TO
CONTINUE AS PER PLAN IF THE SHALE AREA
IS NOT PROBLEMATIC AND DOES NOT
PRODUCE LARGER PIECES OF SHALE THAN
WE HAVE SEEN. IF RIH TO BOTTOM IS
CLEAN, DRILL 100' OR FOR 1 -HR AND
PERFORM A MINI WIPER TO SEE HOW THE
SHALES ACTING. _
PROD1 CLOSE EDC, RIH AT MIN RATE
- SET DOWN AT 9219' MD WITH 7.7K, POPPED
BY TO 9221'. PU. ATTEMPT TO GET BY BY
INCREASING RATE TO 1.0 BPM. IMMEDIATE
STALL ON MOTOR. ATTEMPT TWICE. CALL
ACTING WSUPT. DISCUSS NEED TO DRILL
THROUGH.
PU AND ESTABLISH PARAMETER. RIH AT 30.
STALLED MOTOR TWICE. SLOW TO 3 FPH.
60 PSI MOTOR WORK SEEN, WASH DOWN
TO9300'. CHASE UPTO TUBING TAIL.
BOTTOMS UP CLEAN.
-CLOSE EDC.
Printed 9/19/2019 10:01 37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 11-37
BPUOI: USA00001243
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 8/20/2019 End Date: 8/24/2019
Project: PBU
Site: it
Rig Name/NoCDR-2
Spud Date/Time: 11/7/1996 12:00:OOAM
Page 10 of 22
AFE No
H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.50us8 (above Mean Sea Level)
BPUOI: USA00001243
Date From - To Hrs Task
Code NPT Total Depth Phase Description of Operations
(hr)
(us8)
19:30 - 20:30 1.00 DRILL
P 10,378.00 PROD1 RIH
- 0.50 BPM IN RATE / 0.64 BPM OUT RATE
- 8.71 PPG IN 18.70 PPG OUT
- SAT DOWN AT 9172' AND 9196' AND POPPED
THROUGH WITH 3.4K.
- SAT DOWN AGAIN AT 9219' WITH 7.7K.
ATTEMPT TO GET THROUGH AT 1.5 BPM. NO
LUCK.
-BRING TO DRILLING RATE. GET THROUGH.
DROP BACK TO MIN RATE.
- SAT DOWN AT 9354'
-9368' 200 PSI MOTORWORK. DRILLTO
9377' STACK 4KAND STALL. PULL-8.6KON
BIT.
- PU AND DISCUSS WITH TOWN TEAM.
CONSENSUS IS CUTTINGS LEFT BEHIND.
20:30 - 00'.00 3.50 DRILL
P 10,378.00 PROD1 CLEANOUT
- 2.80 BPM IN RATE 2.87 BPM OUT RATE
CIRCULATING PRESSURE: 3640 PSI
- 8.80 PPG IN / 8.69 PPG OUT
'- SET DOWN AT 9300'WITH 3.6K. PU CLEAN
'- SET DOWN AT 9371'W1TH 1,2K, MOTOR
WORK 100-250 PSL DRILL DOWN 709388'.
NO SET DOWN SEEN DOWN TO 9500'
-WIPER UP TO TUBING TAIL. COILWEIGHT
OVERPULLAT 9427. 0.5K DRAG BACK
THROUGH SHALE.
- PERFORM 100'JOG BELOW WINDOW.
PULL THROUGH WINDOW WITHOUT ISSUE.
- JET TRAY AT 4.4 BPM WITH 10 BBL LO / HI
VIS COMBO PILL. CHASE TO TUBING TAIL.
PUMP BOTTOMS UP.
- MINIMAL CUTTINGS RETURNED.
- LOG TIE IN WITH +3' CORRECTION.
-RIH THROUGH_ WINDOW _
8/19/2019 0000 - 0300 3.00 DRILL
P 10,378.00 PROD? CLEANOUT
- 0.80 BPM IN RATE 0.92 BPM OUT RATE
CIRCULATING PRESSURE: 1666 PSI
- 6.80 PPG IN / 8.69 PPG OUT
- TAKE WEIGHTAT 9220, 9287, 9362, 9377,
9391' STACK BETWEEN 2-5KAND GO BY.
- BRING RATE UP TO DRILLING RATE AT 9500'
- 2.80 BPM RATE IN / 2.87 BPM OUT RATE
-8.80 PPG IN /8.7 PPG OUT.
- RIH CLEAN TO 9916', START TAKING
WEIGHT AND DRILLING DOWN TO 9934'
-PU. PULL-11KATBIT. STARTEDTO
RACKOFF. PULLEDBY, DRAGGINGAND
GRADUALLY LOSING WEIGHT UP TO 9867'
- WIPER TO WINDOW.
-PULL THROUGH WINDOW BRING RATE
BACK UP.
Printed 9/19/2019 10-01:37AM "All depths reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Page 11 of 22
- -- - -
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 8/20/2019
End Date: 812412019
H-S4DW0019G5-EX-DI-RN-(1,907,271.00)
Project PBU
Site: 11
Rig Name/No.: CDR -2
Spud Datefrme: 11!7/1996 12:00 OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001243 _
Active datum: KS @53.50usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
Waft) — ..
_ 05__
0 - 45 2.75
3:00
_
DRILL P
10,378.00 PROD1
CLOSE EDC.
- RUN BACK TO BOTTOM
- 0.69 BPM IN RATE 10.83 BPM OUT RATE
-8.72 PPG IN /8.69 PPG OUT
- SMALL BOBBLE AT 9220'.
-SET DOWN AT 9300' 9387' HAD TO BRING
UP TO FULL RATE TO MAKE IT BY. WORK
MULTIPLE TIMES. POP BY.
- DROP BACK TO MIN RATE.
-9850' BRING UP TO DRILLING RATE
- WASHED DOWN TO 9972' MD, START
WORKING DOWN TO 10000' FALLING
FREELY. NO WOB RESPONSE. RUNDOWN
TO 10234'
- DRAG BACK 7O 9500' PUMP 10 BBL HIVIS
OUT BIT.
RIH
CONTINUE WORKING TO TD
- SET DOWN AT 10345 NO MOTOR WORK, PU
SET DOWN SAME SPOT
- PU TO 10300' THEN RIH TO SEE IF WE SET
DOWN AT 10320'
- SET DOWN AT 10329
- PU TO 10300 AND RIH 10 FPM AT DRILLING
'RATE, CLEANER AT SLOWER SPEED AND
MADE IT BACK TO BOTTOM
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 12 of 22
Operation Summary Report
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/20/2019 End Date: 8/242019
H-S4DW0019G5-EX-D7-RN- (1,907,271.00)
Protech PBU Site: 11
Rig Name/No.: CDR -2 Spud DateTme: 11/7/1996 12:00:00AM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usft)
05:45 - 12:30 6.75 DRILL P 10,378.00 PROD1
DRILL 4-1/8" LATERAL
- FREE SPIN: 3622 PSI, 2.80 BPM
- RATE: 2.80 BPM IN, 2.82 BPM OUT, CIRC
PRESSURE: 3893 PSI
- MUD WEIGHT: 8.79 PPG IN, 8.70 PPG OUT,
ECD: 10.29 PPG
- ROP: 90 FT/HR, WOB: IAKLBS
- DRILLED TO 10490' IN 1 HOUR, PU TO 10100'
AND VERIFY THE SHALE BEHIND USARE
BEHAVING
- 15K OVER PULL AT 10411 PULLED FREE,
10327 PULLED 7K OVER -4K AT THE BIT SAME
SPOT WE WERE SEEING YESTERDAY
- CLEAN AFTER 10327 to 10200, RIH AND
REDUCE PUMP RATE THROUGH 10300 SHALE
- SET DOWN AT 10131', PU AND RIH PAST
WITH A SMALL CHANGE IN Wf
- SET DOWN AT 10319, PU AND BRING PUMPS
TO FULL RATE, RIH AT 10 FPM
- TAG AT 1033V AND STALL, PU AND PULL
HEAVY TO 65K AND PULLED FREE
- RIH AT MIN RATE AND TAG AT 10333 WITH
WOB A LITTLE MOTOR WORK
- PU AND PULLED TO 80K, RIH AND PU,
PULLED TO 78K
- RIH SET DOWN THEN LOOKED LIKE WE
MOVED, BRING PUMP UP TO RATE
- PU AND WE ARE FREE, CONTINUE PUH AND
RECIPROCATE BETWEEN 10100 AND 10250
AND DISCUSS PLAN FORWARD WITH WSUPT
AND ETL
- PLAN IS TO RIH TO 10300 CIRC PILLS UP
WHILE POOH TO THE WINDOW. PUMP PILLS
FOR THE WINDOW AND 4-12" TUBING AND
LOOKAT WHAT THEY BRING UP
- 10300 PILLS HAD ABOUT 3040%
INCREASE IN DRILLED FINE CUTTINGS
-AT THE WINDOW, JOG IN HOLE, PULL
THROUGH WINDOW AND OPEN THE EDC.
CIRC PILLS FROM WINDOW OUT WHILE PUH
TO THE 4-1/2 TIMING PILLS FOR THE 4-1/2
- BOTTOMS UP PILL FROM THE WINDOW NOT
MUCH, THEN UNLOADED A LOT OF SHALE
AND SAND 709//30%
- WELL UNLOADED FOR 30 MINUTES WITH
LARGER CHUNKS TOWARDS THE END THEN
STARTED CLEANING
- CALLAND DISCUSS WITH WSUPT AND ODE
- CALL MADE TO SETA BILLET
Printed 9/192019 10:01:37AM **All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Page 13 of 22
Common Well Name'. 11-37
STATIC
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 8/20/2019
End Date: 8/24/2019
H-S4DW0019G5-EX-DI-RN-(1,907,271.00)
Project: FBU
-Site: 11 - --
—`
- MAKE UP BHA. VERIFY OD ON SETTING
Rig Name/No.: CDR -2
Spud Dale/Time: 11/7/1996 12:00:OOAM
_
Rig Release:
Rig Contractor NABORS ALASKA DRILLING INC.
PROD? RIH WITH 3.625' BILLET BHA45
_BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
PRESSURE: 845 PSI
Date From - To Him
Task Cade NPT
Total Depth Phase
Description of Operations
(hr)
_.
(usti)
12:30 - 18:00 5.50
DRILL N
10,490.00 PROD?
PREP WELL TO SET BILLET
1800 - 21:00
21.00 - 0000
-CLOSE EDC AND RIH PUMPING PILLS
-PASS THROUGH TO BOTTOM OF THE 24N AT
9220 CLEAN, RIH TO 9280 RAT HOLE FOR
BILLET
- RIH AND SET DOWN AT 9220, ODE CALLED
AND SAID SET DEPTH WILL BE SHALLOWER
HOLE IS CLEAN TO 9200' POOH CHASING
PILLS
-JOG IN HOLE AT THE WINDOW, PULL
THROUGH WINDOW, OPEN EDC, JET TRAY
CHASING PILLS UP TO 4-1/2 AT 35% AT 4.22
BPM
- BOTTOMS UP FROM THE WINDOW HAD
MINIMAL INCREASE IN CUTTINGS, JUST
SOME OF THE COURSE CAVINGS FROM THE
10320 SHALE.
-POOH
3.00 DRILL N 10,490.00 PROD? MONITOR WELL FOR 10 MINUTES AT BHA:
3.00 DRILL N
8/20/2019 00:00 - 03:00 3.00 DRILL N
03.00 - 03:30 0.50 DRILL N
03:30 - 04:00 0.50 BOPSUR P
04.00 - 05:00 1.00 DRILL P
Pnnted 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"
STATIC
- CLOSE EDC, POWER DOWN
- INJECTOR OFF: 18:07
- SWAP LQC OUT, STAND BHA BACK
- REPLACE FLOATS / TEST TO 3500#
- MAKE UP BHA. VERIFY OD ON SETTING
TOOLAND BILLET COMPONENTS
_
- INJECTOR ON: 20:35
9,020.00
PROD? RIH WITH 3.625' BILLET BHA45
- RATE: 0.36 BPM IN, 0.77 BPM OUT, CIRC
PRESSURE: 845 PSI
- MUD WEIGHT: 8.71 PPG IN, 8.71 PPG OUT
- LOG DOWN FOR TIE-IN FROM 8270' TO 8295'
MD (FORMATION) WITH -8' CORRECTION
-CLOSE EDC. ORIENT TO O°. RUN THROUGH
WINDOW. TOOK2.3KAT 8580'. RUN IN HOLE
TO SET DEPTH OF 9029.4'
-PRESSURE UPTO44001AT0.3 BPM. GOOD
INDICATION OF SETAND SHEAR. STACK 5K
ON BILLET.
- TOP OF BILLET SET AT 9020' MD AT 0°
ORIENTATION.
- PICK OFF CLEAN.
- PERFORM 10 MIN FLOW CHECK_.
9,020.00
PROD1 POOH. PERFORM MUD SWAP
- MUD WEIGHT: 8.56 PPG IN, 8.5 PPG OUT
- RATE: 4.04 BPM IN, 3.96 BPM OUT
-PERFORM 10 MIN FLOW CHECK. WELL
STATIC
- INJECTOR OFF:03:00
9,020.00
PROW BHA
_ - LD BILLET SETTING BHA _
9,020.00
PROD? WEEKLY BOPE FUNCTION TEST
- FUNCTION BLIND / SHEAR RAMS
- INSTALL 2-3/8" JOINT
- FUNCTION ANNULAR, UPPER 2-318" PIPE /
SLIP RAMS, VARIABLES, LOWER 2-3/8" PIPE /
_ _SLIP RAMS
9,020.00
PROD? REPLACE RACKOFF
- PRESSURE TEST TO 250 PSI LOW / 3500 PSI
HIGH GOOD TEST
- MU THE BHA
Pnnted 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 14 of 22
Common Well Name: 11-37 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/20/2019 End Date: 8/24/2019 H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
Project: PBU Site'. 11
Rig Name/No.: CDR -2 Spud Date/Time: 11/7/1996 12:00:OOAM Rig Release:
Rig COmrwtor: NABORS ALASKA DRILLING ING.
- CONTINUE DRILLING SWAP TO 11-37A
oruvr wnwvv levo
Active datum: KB @53.50usft (above Mean Sea Level)
- FREE SPIN: 3613 PSI, 2.91 BPM
Date From - To Him Task
Code NPT Total Depth
Phase Description of Operations
(hr) _
(usft). _
- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
0500 - 0800 3.00 DRILL
N 9,020.00
PR0D1 RIH HOLE OPS
PRESSURE: 230 PSI
_
- MU INJECTOR TO THE BHA, STAB ON AND
20:00 - 21:00 1.00 DRILL N 9,475.00
PRODt DRILL 4-1/6" LATERAL
TEST THE QTS
- FREE SPIN: 3613 PSI, 2.91 BPM
- INJECTOR ON AT 05:15
PRESSURE: 3613 - 3740 PSI
- GOOD PT RIH
i- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
- TIE IN -12' CORRECTION, CLOSE EDC AND
PRESSURE: 228 PSI
RIH TO TA BILLET _
08:00 - 10:30 2.50 DRILL
N 9,022.00
PRODt KO BILLETAND DRILLING OPS
- RATE: 2.91 BPM IN, 2.77 BPM OUT. CIRC
- TAG TOB AT 9021' NO PUMP
PRESSURE: 3556 PSI
- PU, ONLINE WITH PUMPS TO GET
SLOW RATE THROUGH WINDOW.
PARAMETERS
- CHASE UP TO TUBING TAIL, RUN BACK IN
- TAG AND STALLAT 9020.361, STALL AT 9020.2
- LOG DOWN FOR TIE-IN FROM 8260' TO 8291'
- KICK OFF BILLET AND DRILL4-1/8' LATERAL
MD (FORMATION) WITH *4' CORRECTION
- FREE SPIN: 3122 PSI, 2.85 BPM
TAKE WEIGHT AT 8688', 8705'.8717- HAD TO
- RATE: 2.85 BPM IN, 2.87 BPM OUT. CIRC
BRING RATE UP TO ROLL BY.
PRESSURE: 3318 PSI
- MUD WEIGHT: 8.54 PPG IN, 8.46 PPG OUT,
ECD: 10.29 PPG
- ROP: 90 FT/HR, WOB: 1.4KLBS
- TAG AT 9020 START TIME MILLING FIRST 1'
THEN START APPLYING WOB
'- MILLED l' STARTAPPLYING M0RE W0B AND
DIFFERENTIAL
- LOOKS LIKE WE MILLED OFF IN 2,
CONTINUE DRILLING AHEAD
- DRILLED 30', PULL BACK THROUGH AT MIN
RATE CLEAN, SHUT DOWN PUMP AND RIH,
PASSED THROUGH CLEAN
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"'
- CONTINUE DRILLING SWAP TO 11-37A
10:30 - 20:00 9.50 DRILL N 9,450.00
PR0D1 DRILL 4-1/8"LATERAL
- FREE SPIN: 3613 PSI, 2.91 BPM
- RATE: 2.92 BPM IN, 2.92 BPM OUT. CIRC
PRESSURE: 3613-3740 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
ECD: 10.30 PPG AT WINDOW WELLHEAD
PRESSURE: 230 PSI
_
-R0P: 30-40 FT/HR, W0B: 2.0-3.O KISS
20:00 - 21:00 1.00 DRILL N 9,475.00
PRODt DRILL 4-1/6" LATERAL
- FREE SPIN: 3613 PSI, 2.91 BPM
- RATE: 2.92 BPM IN, 2.92 BPM OUT. CIRC
PRESSURE: 3613 - 3740 PSI
i- MUD WEIGHT: 8.60 PPG IN, 8.52 PPG OUT,
''. ECD: 10.34 PPG AT WINDOW WELLHEAD
PRESSURE: 228 PSI
_ -R0P: 3040 FT/HR, W0B: 2.0-3.0 KLBS_
21:00 - 00:00 3.00 DRILL N 91482.00
PROD1 PERFORM LONG WIPER TRIP TO WINDOW
- RATE: 2.91 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3556 PSI
-SLOW RATE WHILE PULLING BY BILLET.
SLOW RATE THROUGH WINDOW.
- CHASE UP TO TUBING TAIL, RUN BACK IN
AT MAX RATE. 50% INCREASE IN CUTTINGS.
- LOG DOWN FOR TIE-IN FROM 8260' TO 8291'
MD (FORMATION) WITH *4' CORRECTION
- CLOSE EDC, RUN TO BOTTOM AT MIN RATE.
TAKE WEIGHT AT 8688', 8705'.8717- HAD TO
BRING RATE UP TO ROLL BY.
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"'
North America - ALASKA - BP
Operation Summary Report
Page 15 of 22
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 8/20/2019
End Date: 8/242019
H-S4DW0019G5-EX-D1-RN- (1,907,271.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud DateTme: 11/7/1996 12:00:OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To HM
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft) _
621/2018 0000 - 0930 9.50
DRILL N
9,65900 PRODi
DRILL 4-1/8" LATERAL 7O 9860'
0930 - 11:00 1.50 DRILL N
11:00 - 14:45 3.75 DRILL
M
- FREE SPIN: 3484 PSI, 2.82 BPM
- RATE: 2.82 BPM IN, 2.84 BPM OUT. CIRC
PRESSURE: 3484-3803 PSI
-MUD WEIGHT: 8.61 PPG IN, 8.58 PPG OUT,
ECD: 10.38 PPG CHOKE PRESSURE: 237
- ROP: 30-70 FT/HR, WOB: 1.8 — 2.8 KLBS
PERFORM BHA WIPERS AS NEEDED.
- DRILLED INTO A SHALE AT 9695' MD WISE
ITS NOT THE 22N
HAVING TROUBLE KEEPING WOB,
INCREASE LUBEST03%. ---
9,925.00 PROD? ,DRILL 4-1/8"LATERALTO 9925'
- AT 9910' PUMP 5 BBLS LO / HI VIS SWEEPS.
91925.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 9925' MD
.- RATE: 3.08 BPM IN, 3.03 BPM OUT. CIRC
PRESSURE: 3860 PSI
- 20K OVERPULL AT 9780' THEN POP FREE.
SLIGHT OVERPULL SEEN AT DWOB.
SLIGHT DRAG AND MOTOR WORK PULLING
'THROUGH 9370'SHALE AS TF ROLLS
AROUND TO KEEP UP WITH AS DRILLED TF.
- PUMP 0.5 BPM PULLING PAST BILLETAT OL
ORIENTATION, SEE 4K OVERPULL
- PERFORM JOG BELOW WINDOW.
- PULL THROUGH WINDO W AT 0.4 BPM, 20L,
25 FT/MIN NOTHING SEEN.
- TRAP PRESSURE AND OPEN EDC, PUMP 10
BBLS LO / HI VIS SWEEPS AROUND.
-JOG ACROSS WHIPSTOCK TRAY.
- SWEEP BRINGS BACKABOUT 20% EXCESS
CUTTINGS.
j - PULL UP TO TUBING TAIL PUMP 4.2 BPM
3900 PSI.
- PUMP ANOTHER 10 BBLS LO / HI VIS
SWEEPS AROUND AT TUBING TAIL.
- LOG DOWN FOR TIE-IN FROM 8260' MD
(FORMATION) WITH *5' CORRECTION.
-SECOND SWEEP BRINGS BACK SOME
SMALL SHALE PIECES.
- STOP ABOVE WINDOW AND CLOSE EDC.
- PASS THROUGH WINDOW AT 30L, 0 PUMP,
15 FT/MIN NOTHING SEEN.
- RIH TO BOTTOM PUMP 0.35 BPM 135 FT/MIN.
- RUN PAST BILLETAT OL, 0 PUMP, 25 FT/MIN
NOTHING SEEN.
- 2 - 4K WEIGHT SETDOWNS SEEN ON DWOB
AT 9398', 8418', 9430-
- SETDOWN AT 9760', PICK UP AND RIH AT 14
BPM, SLIGHT SETDOWN AT 9770' AND POP
THROUGH.
Printed 8/192019 10:01:37AM **All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 16 of 22
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 8/20/2019 End Date: 8/24/2019
H-S4DW0019G5-EX-D7-RN-(1,907,271.00)
Project: PBU Site: 11
Rig Name/No.: CDR -2 Spud DateTme: 11!7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KS @53.50usft (above Mean Sea Level)
Date From -To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usft)
14:45 - 17.00 2.25 DRILL N 9,925.00 PROW
DRILL 4-1/8" LATERAL TO FROM9925-TO
10031'
- FREE SPIN: 3800 PSI, 2.98 BPM
- RATE: 2.98 BPM IN, 2.98 BPM OUT. CIRC
I PRESSURE: 3800-4020 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.55 PPG OUT,
ECD: 10.30 PPG AT WINDOW, CHOKE
PRESSURE: 180-200 PSI
- ROP: 30-80 FT/HR, WOB: 1.9 - 2.8 KLBS
- PERFORM PICKUPS AS NEEDED TO KEEP
SLIDING.
AT 10025'PUMP 8 BBLS LO/HI VIS SWEEPS.
1700 - 2000 3.00 DRILL N 9,925.00 PROD1
STEERING IS VERY POOR, LAST SAMPLE IS
55% CHERT.
POOH FOR BIT.
.- WIPER TO TUBING TAIL PRIOR TO LAYING IN
9.8 PPG
'- PUMPED MAX RATE. ON BOTTOMS UP 30%
INCREASE IN VERY COURSE CUTTINGS.
- CONTINUE TO CIRCULATE TILL CLEAN.
-CLOSEEDC. RIH AT MINIMUM RATE TO
9300' MD.
20:00 - 23:00 3.00 DRILL N 9,925.00 PROD1
PERFORM 10 MIN DYNAMIC FLOW CHECK
- POOH WHILE LAYING 9.8 PPG FLUID.
MAINTAIN 10.3 PPG ECD AT WINDOW.
- 2.71 BPM IN RATE / 2.25 BPM OUT RATE
-9.e PPG IN /9.8 PPG OUT _
2300 - 0000 1.00 DRILL N 9,92500 PRODI
PERFORM 10 MIN FLOW CHECK. GOOD
- SIMOPS: CHECK TORQUE ON SADDLE
CLAMPS ON REEL
- FUNCTION TEST AGITATOR AT 2.5 BPM / 2.6
BPM. GOOD INDICATION OF FUNCTION
- INJECTOR OFF: 23:08
- BIT 6 -2 -BT -N -X -I -LT -PR
- SWAP MWD TOOLS. RIH WITH BHA.
- INJECTOR ON: 23:54
- TEST QTS TO -35 - 00#. GOOD TEST _
8/22/2019 00:00 - 03:30 3.50 DRILL N 10,031 00 PRODi
RIH WITH 4-1/8" DILLING BHA#8
- RATE: 0.54 BPM IN, 0.94 BPM OUT. CIRC
PRESSURE: 845 PSI
- MUD WEIGHT: 9.78 PPG IN, 9.83 PPG OUT
- START HOLDING 10.3 PPG AT WINDOW.
- LOG DOWN FOR TIE-IN FROM 8255'
(FORMATION) WITH -10' CORRECTION
-CLOSE EDC. PU WEIGHT 44K / RIH WEIGHT
25K
- RUN THROUGH WINDOW AND BILLET
WITHOUT ISSUE.
- 1-3K BOBBLES AT 9605' AND 9775'
- CONTINUE TO FINISH CIRCULATING
WELLBORE BACK OVER TO 8.6 PPG.
0330 - 0500 1.50 DRILL N 10,114.00 PROD1
DRILL4-1/8' LATERAL
- FREE SPIN: 3843 PSI, 3.03 BPM
- RATE: 3.03 BPM IN, 3.01 BPM OUT. CIRC
PRESSURE: 3843-4048 PSI
- MUD WEIGHT: 8.72 PPG IN, 8.87 PPG OUT,
ECD: 10.3 PPG AT WINDOW
- ROP: 100- 150 FT/HR, WOB: 1.50-2.9 KLBS
Printed 9/190019 10:01:37AM "All depths reported in Drillers Depths"
North America - ALASKA - SP
Operation Summary Report
Page 17 of 22
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/20/2019 End Date: 8124/2019
H-S4DW0019G5-EX-D1-RN- (1,907,271.00)
Project PBU Site: 11
Rig Name/No.: CDR -2 Spud DateTme: 11/7/1996 12*00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) lush)
_
05:00 - 10:30 5.50 DRILL N 10,380.00 PROD1
DRILL 4-118" LATERAL 7O 10380'.
- FREE SPIN: 3388 PSI, 2.78 BPM
- RATE: 2.78 BPM IN, 2.81 BPM OUT. CIRC
PRESSURE: 3388-3577 PSI
-MUD WEIGHT: 8.71 PPG IN, 8.66 PPG OUT,
ECD: 10.3 PPG AT WINDOW
- ROP: 100 FT/HR, WOB: 1.50 KLBS
- AT 10180' PULL 150' WIPER TRIP, CLEAN
PASS UP AND DOWN.
- AFTER WIPER TRIP DRILLAT 3.06 / 3.09 BPM
- CIRC PRESSURE 3950 - 4200 PSI
- MUD WEIGHT 8.76 PPG IN 18,69 PPG OUT
- MAINTAIN 10.3# ECD AT WINDOW
-CONDUCT FREQUENT PICKUPS AS NEEDED
TO KEEP SLIDING
-GETTING SOME HEAVY PICKUPS, RAISE
-SRV OF MUD TARGET 60K.
- AT 10230' PUMP 5 BBLS LO / HI VIS SWEEPS
- AT 10282' PULL WIPER TRIP TO DISCUSS
INJECTOR ISSUE. 3 TABS ON THE CARRIER
BLOCKS HAVE BEEN FOUND BENT.
-
DECISION IS MADE TO INSPECT ON THE
NEXT WIPER TRIP.
- PICKUP AT 10337 IS 60K, 4K ON DWOB.
PULL SHORT WIPER TRIP.
- AT 10350' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND _
1030 - 1300 2.50 DRILL P 10,480.00 PROD?
DRILL 4-1/8° LATERAL TO 10480'.
-AT 10394' PULL 150' WIPER, CLEAN PASS UP
AND DOWN.
-AT 10465' PUMP 10 BBLS LO / HI VIS
SWEEPS AROUND, PREP FOR LONG WIPER
TRIP.
13:00 - 16:30 3.50 DRILL P 10,480.00 PROD1
PULL LONG WIPER TO WINDOW FROM
10480'.
PUMP 3.04 / 2.97 BPM.
MUD WEIGHT IN / OUT IS 8.78 / 8.68 PPG
CIRC PRESSURE 4000 PSI.
CLEAN PASS UP, SLIGHT DRAG THROUGH
THE SHALES.
PERFORM JOG BELOW WINDOW.
PULL THROUGH WINDOW AT 0.5 BPM, 25
FT/MIN, 20L TF, NOTHING SEEN.
TRAP PRESSURE AND OPEN EDC.
JET WHIPSTOCK TRAY AT 4.1 BPM.
PUMP 10 BBLS LO / HI VIS SWEEPS JUST
ABOVE WINDOW.
SWEEP BRINGS BACK ABOUT 30% EXCESS
CUTTINGS.
PICK UP TO TUBING TAIL, PUMP ANOTHER 10
BBLS LO / HI VIS SWEEP.
DURING THIS SWEEP CUTTINGS INCREASE
ABOUT40%.
TAKE PICTURES OF 3 BENT TABS ON
CARRIER BLOCKS.
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 18 of 22
Common Well Name: 11-37
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date:
8/20/2019
End Date: 824/2019
H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud Date/time: 11/7/1996 12:00:00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB (g?53.50us8 (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(htl
(usft)
1640- 19:00
2.50
DRILL
N
10,480.00
PROD1
DECISION IS MADE TO POOH TO CHANGE
OUT CARRIER BLOCKS.
TIE IN DEPTH, CORRECT -6'.
RUN BACK THROUGH WINDOW TO LAY IN 9.8
PPG FROM 9300' MD
PULL THROUGH BILLET AND WINDOW
PERFORM 10 MIN DYNAMIC FLOW CHECK
GOOD
19.00 - 21:00
2.00
DRILL
N
10,480.00
PROD1
POOHAT60 FPM WHILE MONITORING
CARRIER BLOCKS
- MUD WEIGHT: 9.75 PPG IN, 9 75 PPG OUT
-RATE: 1.68 BPM IN, 1.36 BPM OUT
MAINTAINING 10.3 PPGAT WINDOW
21:00 - 22:00
too
DRILL
N
10,480.00
PRODi
PERFORM AGITATOR TEST
- PERFORM 10 MIN FLOW CHECK. GOOD
- INJECTOR OFF: 21:39
-PULL BHA. BIT GRADED
2-1-CT-N-X-1-NO-RIG
-CLOSESWAB, PUT WELL ON MANAGED
PRESSURE. MAINTAINING 10.3-10.4 PPG ON
FORMATION
22:00 - 0000
2.00
DRILL
N
10,480.00
PRODi
PJSM FOR CHAIN REPAIR
-LO/TO INJECTOR.
-BEGIN REPAIRS _
8/23/2019 0000 - 02:00
2.00
DRILL
N
10,480.00
PROD1
INJECTOR REPAIR
0200 - 03:00
1.00
DRILL
N
T
10,480.00
PROD1
PJSM, TAKE WELL OFF MANAGED
PRESSURE. BLEED DOWN. FLOW CHECK
WELL. STATIC
OPEN SWAB
- MU BIT TO DRILLING BHA, INJECTOR ON:
0256
03:00 - 04:30
1.50
DRILL
N
_
10,480.00
PROD1
RIH WITH 4-1/8" DRILLING BHA#8
- RATE: 0.48 BPM IN, 0.68 BPM OUT. CIRC
PRESSURE: 812PSI
- START SENDING 8.6 PPG DOWN COIL
- MUD WEIGHT: 8.76 PPG IN, 9.70 PPG OUT
MAINTAINING 10.3 PPG AT WINDOW
WELLHEAD PRESSURE: 188 PSI
- LOG DOWN FOR TIE-IN FROM 8260' MD
(FORMATION) WITH -13' CORRECTION
- CLOSE EDC. PU 49K / RIH 26K
- RUN THROUGH WINDOW WITHOUT ISSUE.
04:30 - 07:30
3.00
DRILL
P
10,480.00
PROD1
RIH WITH 4-1/8" DRILLING BHA#8
- RATE: 0.61 BPM IN, 0.77 BPM OUT. CIRC
PRESSURE: 1203 PSI
- MUD WEIGHT: 8.76 PPG IN, 9.70 PPG OUT
MAINTAINING 10.3 PPG AT WINDOW
- RIH CIRCULATE 9.8# TO SURFACE
- SET DOWN AT 9306' AND POP THROUGH
- RECIPROCATE NEAR BOTTOM TO PUMP
REMAINING 9.6# MUD OUT
Printed 9/192019 10:01:37AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Wen Name: 11-37 AFE No
Event Type. RE-ENTER- ONSHORE (RON) Start Dale: 812012019 End Date: B/24/2019 H-S4DM
Page 19 of 22
(1,907,271.00)
Project: PBU. - _- _ _- :. Site: 11
Rig Name/No.: CDR -2 Spud DateRime: 11M1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50us8 (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (us6)
07:30 - 16:30 9.00 DRILL P 10,770.00
PROD1 DRILL 4-1/8" LATERAL FROM 10480' MD TO
10770' MD
- FREE SPIN: 3780 PSI, 2.91 BPM
- RATE: 2.90 BPM IN, 2.94 BPM OUT. CIRC
PRESSURE: 3800-4050 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.68 PPG OUT,
ECD: 10.25 PPG AT WINDOW
-ROP: 20-70 FT/HR, WOB:1-3 KLBS
-AT 10530' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND
-AT 10600' INCREASE MUD LUBES TO 3.25W
-AT 10608' PULL 150' WIPER TRIP. CLEAN
PASS UP AND DOWN.
- CONDUCT FREQUENT PICKUPS NEAR TO
li
'TOKEEPSLIDING.
16'30 - 2130 5.00 DRILL P 10,775.00
PROD1 CONDITION WELLBORE
- WIPER TO WINDOWAT DRILLING RATE.
- PULLED HEAVY AND STARTED STALLING
MOTOR AT 9410'- 9350'
-RIHANDSLOWPUMPS. PULLTHROUGH
WITH SOME DRAG.
- PULL BY BILLET AND WINDOW WITHOUT
ISSUE. JET TRAY WITH MAX RATE.
-JET 7" AND CHASE UP TO TUBING TAIL.
'- BOTTOMS UP BROUGHT BACK SHALE
CUTTINGS, VERY ROUNDED.
-LOG TIE IN WITH+4'CORRECTION. RIH AND
CONTINUE TO CIRCULATE AT MAX RATE TO
CLEANUP CUTTINGS. CUTTINGS CLEANED
UP ON SHAKER.
- CLOSED EDC, RIH AT MIN RATE, BOBBLE
AT 8688', 9229', 9454, 9595, 9610, 9779. RUN
THE REST OF THE WAY CLEAN
- CONFIRMED FINAL CORRECTED TD AT
0775' MD _
21:30 - 00'.00 2.50 DRILL P 10,775.00
PROD? CONDITION WELLBORE
- 3.08 BPM RATE IN / 3.00 BPM RATE OUT
-8.86 PPG IN /8.72 PPG OUT CIRC
PRESSURE: 4153 PSI 10.3 PPG ECD AT
WINDOW
-PULLAT25FPM. PULLEDHEAVYAND
STARTED PACKING OFF AT 9505'. HAVETO
WORK UP AND DOWN TO MANIPULATE
PUMPS THROUGH SHALE AT -9450' TO 9350',
DROP PUMP RATE TO 2.90 BPM. SLOWLY
PULLED THROUGH.
-PULLED UP TO BELOW BILLET. 150' JOG IN
THE HOLE. PULL UP TO BILLET. DROP PUMP
RATE AND PULL BY.
-RATE BACK UP TO 2.90 BPM, PULLTO
WINDOW. PERFORM 200' JOG. PUMPING 10
BBLSHIVIS. PULL THROUGH WINDOW
WITHOUT ISSUE
Printed 9/19/2019 10:01 37AM **All depths reported in Drillers Depths"
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE(RON;
Project: PBU
Rig Name/No.: CDR -2
North America - ALASKA - BP Page 20 of 22
Operation Summary Report
Start Date: 8/20/2019 End Date: 8/24/2019
Site: 11
AFE No
Rig Release:
(1,907,271,00)
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Hm Task
Code NPT Total Depth Phase Description of Operations
(hr)
_ (usft) __
8/24/2019 00:00 - 04:00 4.00 DRILL
P 10,775.00 PROD1 CONDITION WELL
-OPEN EDC, JET WHIPSTOCKAT 4.1 BPM.
- CHASE WITH 10 BBL LO / Al SWEEPS.
CHASE TO TUBING TAIL
- RIH TO TOP OF WINDOW. OUT DENSITY
JUMPED FROM 8.6 PPG TO 8.9 PPG. 30%
INCREASE IN CUTTINGS. COURSE SHALE.
-CIRCULATED 4.1 BPM JUST ABOVE WINDOW
TILL SECOND 10 BBL HIVIS SWEEP OUT EDC.
CHASE TO SWAB.
- CLEAN TRIP. TAG UP. RESET DEPTH.
0400 - 07:45 3.75 DRILL
P 10,775.00 PRODI RIH. MAINTAIN 10.3 PPG WHILE TRIPPING.
-1.04 BPM RATE IN / 1.53 BPM RATE OUT
- 8.74 PPG IN 18.66 PPG OUT MAINTAIN ECD
AT 10.3 PPG AT WINDOW
- TIE IN DEPTH FROM 8250', CORRECT -15'.
- PASSTHROUGH WINDOW AT 30L, 25 FT/MIN,
0 PUMP NOTHING SEEN.
- RIH AT 0.5 BPM.
- SET DOWN 8719', CLEAN PICKUP.
'- SET DOWN AT 8720', CLEAN PICKUP.
'- RIH AT HIGHER PUMP RATE TO 8800', PAST
ALL THE NEAR WINDOW SHALES. GO TO 3.1
BPM AND PULL BACK TO 8670'.
'- RIH FROM 8670' AT 0.5 BPM. 3K BOBBLE AT
8706'.
- PASS BILLET AT OL, 25 FT/MIN, 0 PUMP
NOTHING SEEN.
- CONTINUE RIH. 4K BOBBLE AT 9387' (2214).
- 3K BOBBLE AT 9530' (22N).
- RIH TO 9560' PAST THE 22N SHALE AND
PULLAT 3.1 BPM BACK THROUGH IT AT 20
FT/MIN.
- 5K OVERPULLAT 9405' THEN POP
THROUGH. NO ANNULAR PRESSURE
INCREASE HERE, ONLY MOTOR WORK.
- PULL BACK TO WINDOW TO CIRC CUTTINGS
OUTAT HIGH RATE.
- 100' JOG BELOW BILLET.
- PULL PAST BILLET AT OL, 25 FT/MIN, 0.5 BPM
NOTHING SEEN.
-JOG BELOW WINDOW.
- PULL THROUGH WINDO W AT 20L, 25 FT/MIN,
0.6 BPM NOTHING SEEN.
Pnnted 9/19/2019 10:O1 37AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 21 of 22
Common Well Name: 11-37
Phase Description of Operations
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 8/20/2019 End Date: 8/24/2019
H-S4DW0019G5-EX-DI-RN- (1,907,271.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud Date/Time: 11/7/1996 12:00:OOAM
Rig Release:
oi.. NAR11RAAI ARKA nRll I ING INC.
CUTTINGS.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
Phase Description of Operations
(hr) lush)
07:45 - 12:00 4.25 DRILL P 10,775.00
PROD1 TRAP PRESSUREAND OPEN EDC.
- PUMP 10 BBLS LO / HIGH VIS SWEEPS
AROUND AT 4.0 BPM / 4160 PSI.
- SWEEPS DO NOT BRING BACKANY EXCESS
CUTTINGS.
- PUMP B/U FROM TUBING TAIL, RETURNS
SLUG OF LARGER SHALE PIECES.
- RIH TO 8500'. TRAP PRESSURE AND CLOSE
EDC.
!
- PASS THROUGH WINDOWAT 20L, 30 FT/MIN,
0 PUMP NOTHING SEEN.
- RIH PUMP 0.5 BPM KEEP AS DRILLED TF.
- 5K SETDOWN AT 8705' THEN POP
THROUGH.
- SETDOWN AT 8710% PICK UP AND WASH
THROUGH AT 1.3 BPM.
- CONTINUE RIH AT 0.4 BPM.
- PASS BILLETAT OL, 25 FT/MIN, 0 PUMP
NOTHING SEEN.
- CONTINUE RIH 0.45 BPM.
- 3K BOBBLE AT 9350' (22N).
- SETDOWN AT 9450'(22N). PICKUP IS
CLEAN. WASH THROUGH AT 0.75 BPM.
- CONTINUE RIH 0.4 BPM.
- SK SETDOWN AT 10614'THEN POP
THROUGH.
!
- RIH TO 10850' PAST THE SHALES THEN PICK
UP BACK THROUGH THEM AT 3 BPM. CLEAN
!
PASS UP.
•
- RIH BACK TO TO AT 0.5 BPM.
- 6K SETDOWN AT 10530' THEN POP
THROUGH.
- 6K SETDOWN AT 10607' THEN POP
THROUGH.
- CONTINUE RIH, TAG TD AT 10773'.
- INCREASE LUBES IN 9.8# TO 3%.
START 9.8# BEADED PILL DOWN THE CT.
RECIPROCATE IN CLEAN SAND WHILE
PUMPING LINER PILL TO BIT.
1200 - 1400 2.00 DRILL P 10,775.00
PROD1 RIH, SET DOWN AT 10514'. CLEAN PICKUP
TRY TO WASH DOWN 11 TIMES AT VARIOUS
PUMP RATES AND RUNNING SPEEDS, NOT
ABLE TO. DISCUSS WITH ODE, DECISION IS
!
MADE TO SWAP BACK TO DRILLING MUD AND
CLEAN THIS AREA UP. POPTHROUGHON
THE 12TH TRY.
!
WITH 8.7# MUD TRY TO WORK THROUGH
SHALES, STACKING AT 10527'.
PICK UP SLOWLY, CIRC 9.8# OUT OF WELL
FOR CLEANOUT.
WITH MOST OF 9.8# OUT OF WELL GO TO 2.2
BPM, WORK BACK THROUGH SHALE ZONE
TO To AT 10773'.
PULL BACK TO 10500' AT 2 BPM, CLEAN PASS.
14:00 - 15:30 1.50 DRILL P 10,775.00
PROD1 RIH BACK THROUGH SHALE ZONE TO 10650'.
-SET DOWN AT 10610', CLEAN PICKUP.
- RIH TO 10770' AND PUMP 5 BBL WEIGHTED
SWEEP AROUND, MIX UP SECOND 9.8# BEAD
PILL.
- PUMP 9.8# BEAD PILL FOLLOWED BY 9.8#
MUD.
Printed 9/19/2019 10:01:37AM ••All depths reported in Drillers Depths"
Common Well Name: 11-37
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
Ria Name/No.: CDR-2
North America - ALASKA- BP
Operation Summary Report
Start Date: 8/20/2019 End Date: 8/24/2019
Site: 11 — -
AFE No
Page 22 of 22
(1,907,271.00)
Rig Contractor: NABORSALASKA DRILLING INC.
BPUO1: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level
Date From - To Him Task
Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
15:30 - 17:30 2.00 DRILL
P 10,775.00
PROD? POOH, LAY IN 9.8M BEAD PILL IN OPEN HOLE.
KEEP 10.3 PPG AT WINDOW WHILE POOH.
CLEAN PASS TO WINDOW, FEW MINOR
WEIGHT BOBBLES.
PULL PAST BILLETAT OL, 30 FT/MIN, 0.5 BPM
NOTHING SEEN.
PULLTHROUGH WINDOW AT 20L, 30 FT/MIN,
0.5 BPM NOTHING SEEN.
PERFORM 100'JOG ABOVE WINDOWTHEN
TRAP PRESSURE, OPEN EDC.
RIH AND JET WHIPSTOCK TRAY.
1730 - 0000 8.50 DRILL
P 10,775.00
PROD1 POOH
- MUD WEIGHT: 9.82 PPG IN, 9.80 PPG OUT
- RATE: 1.1 BPM IN, 0.91 BPM OUT
- PAINTED YELLOW FLAG AT 7283.79' BIT
DEPTH (7200.5' EDP), PAINTED WHITE FLAG
5133.68' BIT DEPTH (5049.94 EOP)
-STOPAT 100'. PERFORM 10 MIN FLOW
CHECK. WELL STATIC.
- INJECTOR OFF: 19:43
-INSPECT PIPE. FLAT SPOTABOVE COIL
'CONNECTOR.
-LAY DOWN DRILLING BHA
- PUMP 223' OF POSSIBLE 310' OF SLACK
OUT OF COIL
- CUT 31' OF COILAND E -LINE.
- MAKE UP CTC
Printed 9/19/2019 10:01:37AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 1 of 8 1
Common Well Name. 11-37
AFE No
Event Type: COM- ONSHORE (CON)
Stan Date.
8;25/2019 End Date
H-S40W0019G5-EX-DI-RW (1,229,063.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud Date/Time. 11/7/1996 12:00:00AM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From -To
Him Task
Code NPT Total Depth
Phase Description of Operations
(hr) _
(usft)
8/25/2019 00:00 - 03:00
3.00 CASING
P 10,775.00
RUNPRD PREP FOR LINER
- PULL TEST CTC TO 50K. GOOD
I -MAKE UP X -OVERS / SWIVEL
- PRESSURE TEST TO 4500# FOR 5 MIN.
! -BLEED DOWN, INSTALL NOZZLE
- LOAD / LAUNCH 718" STEEL BALL. PUMPED
REEL VOLUME. RECOVERED 7/8" STEEL
BALL
PREP FLOOR AND VERIFY_ COUNTS. _
03:00 - 04:00
1.00 CASING
P 10,775.00
RUNPRD PJSM, RUN PRODUCTION LINER
-MAKEUP SHOE TRACK TO 1ST JOINT OF
2-7/8"
- RUN 2-718" 6.5# 13Cr HYD511 LINER WITH
STANDOFF CONNECTORS
0400 - 04.30
0.50 CASING
P 10,775.00
RUNPRD KICK WHILE TRIPPING DRILL
- 2:30 TO DRILL FINISH.
-CONDUCTED AAR. DISCUSSED CREW
ADAPTING TO USING MANUAL SKATE
CONTROLS. _
0430 - 0630
2.00 CASING
P
10,775.00
RUNPRD 1 CONT'D RUN PRODUCTION LINER.
06:30 - 12:00
5.50 CASING
P
t 10,775.00
RUNPRD M/U 3-11W'X 2-7/8" XO.
CONTINUE M/U 3-1/4" LINER.
M/U 6 JTS OF BTS -6.
I
WU SWIVEL, WU INJECTOR.
TAG STRIPPER, SPACEOUT IS 4.5' IF NEED TO
STRIP UP LATER. _
12:00 - 15:00
3.00 CASING
T P 10,775.00
RUNPRD RIH.
PUMP ACROSS THE TOP.
PUT 250 PSI WHP TO GET BACK TO 10.3 PPG
AT WINDOW.
STOPAT FIRST FLAG, CORRECT -29' TO
8464.6'.
UP WEIGHT HERE IS 42K.
PASS THROUGH WINDOW WITH NO ISSUES.
RIH 40 FT/MIN CONTINUE PUMPING ACROSS
TOP HOLD 250 PSI WHP.
SETDOWNS AT 9430', 9450' (22N) THEN POP
THROUGH.
SETDOWNS AT 9580', 10220', 10540'.
AT 10620' SETDOWN, PUT 400 PSI ON CHOKE
AND P/U, CLEAN.
CONTINUE RIH.
SETDOWN AT 10850', P/U SET DOWN SAME
SPOT.
WORK PAST TO 10659'.
PICK UP IS GOOD AROUND 55K.
WORK PIPE LOSE GROUND BACK TO 10641'.
TRY TO WORK DOWN WITH LESS WHP, KEEP
350 PSI ON WHEN PICKING UP.
CYCLE PIPE 14 TIMES, CAN'T WORK PAST
10630'.
Printed 9/192619 10:03:27AM **All depths reported in Drillers Depths"
Common Well Name: 11-37
Event Type: COM- ONSHORE (CON)
Proiea: PBU
North America - ALASKA - BP Page 2 of 8
Operation Summary Report
Start Date: 8/25/2019 End Date:
Site: 11
AFE No
H-S4DW0019G5-EX-DI-RN- (1,229,063.00)
Rig Name/No.: CDR -2 Spud Date/Time: 11!7/1996 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
Phase Description of Operations
(hr)--(usft)
15:00 - 21:00 6.00 CASING P 10,775.00
RUNPRD PJSM FOR CIRCULATING WELL.
NOTIFY DSO.
KEEP 300 PSI WHP AND BURST DISK WITH
1400 PSI,
PUMP 2 BPM TO COMPRESS AIR IN THE
LINER.
WHEN AIR EXITS THE SHOE WHP AND PUMP
PRESSURE STARTS TO COME UP.
KEEP 300 PSI WHP CIRC AT 2 /1.3 BPM.
!,
RECIPROCATE PIPE TO TRY FOR BETTER
RETURNS, NO LUCK.
• AFTER 68 BELS AWAY PUMP 2 / 0.54 BPM AT
2600 PSI. RECIP PIPE OCCASIONALLY, NOT
HELPING MUCH WITH RETURNS.
AFTER 73 BBLS AWAY, LOSE RETURNS.
RECIPROCATE PIPE, REDUCE RATE TO 1
BPM. REDUCE WHP TO 200 PSI,
PULL BACK TO 10545' AND PARK, GETTING
MINIMAL RETURNS 0 - 0.2 BPM.
PULL BACK 7O 10500'INTO A CLEANER SAND.
TRY TO EASE THE RATE UP, MOVE PIPE UP
� ANOTHER I O'.
RECIPROCATE PIPE OCCASIONALLY
CONTINUE CIRCULATING. RATES 1.30 BPM
IN RATE / 0.63 BPM OUT RATE.
TAKE FLUID OUTSIDE WITH 30 BBLS FROM
BOTTOMS UP. DENSITY DROPPED TO 9.5
PPG LAST 7 BELS. THEN CAME BACK TO
9.78 PPG.
BRING BACK INSIDE. CIRCULATED TILL 8.7
PPG ARRIVED.
PERFORM 10 MIN PUMPS OFF FLOW CHECK.
WELL IS STATIC.
21:00 - 00:00 3.00 CASING P 10,775.00
RUNPRD CIRCULATE
- CIRCULATE 8.8 PPG OD -D TO SHOE. ONCE
AT SHOE INCREASE RATE TO 2.0 BPM
- ONCE 8.7 PPG CIRCULATED.
- COME OFFLINE. ATTEMPT WITH PUMPS
OFF. MOVE DOWN 30'
- BREAK CIRCULATION. 2.00 BPM IN RATE /
1.92 BPM OUT RATE
- PUMP 10 BBLS 1 %KCL 120 BBLS LVT / 10
BBLS KCL
8/26/2019 00:00 - 05:30 5.50 CASING P 10,775.00
RUNPRD PUMP 10 BBLS LVT OUT SHOE
- WORK FROM 10504 DOWN TO 10623'
-DRIVE BY TD FLAG. ON DEPTH
- PUMP 5 MORE BBLS OUT
- WORK DOWN TO 10634'
- PUMP LAST OF LVT OUT SHOE.
- WORK DOWN TO 10655'
- CIRCULATE LVT OUT
-ATTEMPT TO WORK DOWN FURTHER
WITHOUT ANY LUCK.
PUMP 10 BBLS 1%KCL 120 BBLS LVT / 10
BBLS 1%KCL
PUMP 8 BBLS OUT, WORK DOWN TO 10681'
MD
PUMP REMAINING LVT OUT IN SMALL
AMOUNTS AND CONTINUE WORKING PIPE.
CONTINUE WORKING PIPE DOWN TO 10709'.
CYCLE PIPE 9 TIMES AT 10709'. ALL LVT IS
Printed 9/19/2019 10:03:27AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 3 of 8
Common Well Name: 11-37
AFE No
Event Type: COM- ONSHORE(CON)
Start Date: 825/2019 End Date:
H-S4DW0019G5-EX-DI-RN-(1,229,063.00)
Project: PBU - — -
Site: 11 -
Rig Name/No.: CDR -2
Spud DaterTime: 1117/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KS @53.50usft (above Mean Sea Level)
Date From - To
Ars Task Code NPT Total Depth
Phase Description of Operations
(h0 _ (usft)
05:30 - 09:00
_ _
3.50 CASING P 10,775.00
RUNPRD CIRCULATE LVT OUT. KEEP 100 PSI WHIP.
WITH LVT OUT BRING RETURNS BACK TO
PITS.
PUMP 10 BBLS 3% KCL SPACER, 20 BBLS LVT,
10 BBLS 3% KCL SPACER.
PUMP 5 BBLS OUTAND START WORKING
PIPE.
WORK DOWN TO 10715' THEN LOSE GROUND
THEN MAKE IT BACK TO 10715'.
PUMP SMALLAMOUNTS OF LVT OUTAND
WORK PIPE. PICKUPS 60-70K.
WORK PIPE 17 TIMES, NO FURTHER
AFTER 10709'.
09:00 - 12:30
3.50 CASING P 10,775.00
_ _PROGRESS
RUNPRD CIRC LVT PILL OUT 2.43 / 2.35 BPM KEEP 100
PSI WHIP.
DISCUSS PLAN FORWARD WITH ODE,
DECISION IS MADE TO PUMP A LARGER LVT
PILLAS PER OCN #4.
CONTINUE CIRCULATING 2.43 / 2.35 BPM.
MOVE PIPE PERIODICALLY WHILE MIXING
LUBE PILL. _
12:30 - 15:00
2.50 CASING P 10,775.00
RUNPRD REVIEW OCN #4 WITH CREW.
PUMP 50 BBLS 4.25% LUBE PILL WITH NEW
MUD, 30 BBLS 3% KCL SPACER WITH 1 PPB
BEADS, 40 BBLS LVT, 10 BBLS 3% KCL
SPACER WITH 1 PPB BEADS.
PUMP 18 BBLS LVT OUT OF SHOE, ALLOW IT
TO SOAK 20 MIN.
PICK UP AND RIH, TAG AT 10762'.
PICK UP AND REPEAT 2 MORE TIMES, SAME
DEPTH. _
1500 - 16:30
1.50 CASING P 10,775.00
RUNPRD CIRCULATE SPACERS OUT 2.35 BPM.
KEEP WHP AT 150 PSI THEN INCREASE TO
250 PSI WITH LVT IN TUBING TO KEEP 1:1.
PURGE RISER.
BRING RETURNS BACK INSIDE.
GET 2 PICKUPS TO CONFIRM BREAKOVER
WEIGHT.
16:30 - 20:00
3.50 CASING P 10,775.00
RUNPRD PJSM THEN DROP 3/4"STEEL BALL.
LAUNCH BALL, HEARD ROLLING. BALL
LANDEDAT47BBLS. PRESSURE UPTO
4600# SHEARED.
PU TO BREAKOVER 44K. VERIFY RELEASE
TWICE.
CIRCULATE WELLBORE OVER TO 1% SLICK
KCL W/ 0.6 BARALUBE.
SLIP STREAM CEMENTERS 5 BBLS 1%KCL
FOR PT.
PJSM, REVIEWED PRESSURE
CROSSCHECK.
PRESSURE TEST LINES TO 50000. GOOD
TEST.
20:00 - 21:00
1.00 CASING P 10,775.00
RUNPRD WAIT FOR REMAINING FLUIDS TO ARRIVE.
LEVEL 2 ON ROADS.
Printed 9/192019 10:03:27AM ••AII depths reported in Drillers Depths**
North America - ALASKA - BP
Page 4 of 8
Operation Summary Report
Common Well Name: 11-37
AFE No
Event Type: COM- ONSHORE (CON) Start Date: 8/25/2019 End Date:
H-S4DW0019G5-EX-DI-RN- (1,229.1363.00)
Project: PBU Site: 11
Rig Name/No.: CDR -2 Spud Date/Time: 11/7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) .. _Nall) ._
21:00 - 0000 3.00 CASING P 10,775.00 RUNPRD
MIXAND PUMP 52.9 BBLS OF CEMENT:
- FILL LINES WITH WATER AND PRESSURE
TEST TO 5000 PSI FOR 5 MINUTES
- CEMENT WET AT 21:33 HRS.
- ZERO IN MM ONCE DENSITY = 13.5 PPG
-LOAD 52.9 BBLS 15.3 PPG CEMENT IN REEL
- SWAP TO RIG PUMP. CEMENT RUNNING
AWAY QUICKLY. CATCH AFTER 7.5 BBLS.
- BACK RATE DOWN TO KEEP 1-1 RETURNS
AS WE BUILT COLUMN HEIGHT TO KEEP
FROM PUSHING CEMENTAWAY.
PERFORM DISPLACEMENT WITH RIG PUMPS
- DISPLACE CEMENT WITH 8.33 PPG
EXHAUST PILL
- RATE: 1.53 BPM IN, 1.53 BPM OUT
- ZERO OUT MM WITH CEMENT AT SHOE AT
79.8 BBLS AWAY
- TAKE RETURNS TO PILL / TRIP FOR MANUAL
STRAP
- SHUT DOWN PUMPS AT 107.5 BBLS AWAY
(26.5 BBLS BEHIND PIPE)
LAUNCH PEE WEE DARTAND LINER WIPER
PLUG AS FOLLOWS:
� - PICK UP TO BREAKOVER -16 FT (10754' MD)
PER BTT REP, EXPOSE DOGS, SET DOWN AT
10748' MD (14 FT HIGHER)
- ATTEMPT TO SHIFT PEE WEE, PUMPED 1.7
BBLS. DID NOT SEE RELEASE. PU AND SET
DOWN AGAIN. PEEWEE LAUNCHED
- SHIFT PEE VTEE PLUG DOWN WITH 1500
PSI, PICK BACK UP TO AND SIDE EXHAUST
REMAINING 1 BBL OF CEMENT.
- SET DOWN 10KAT 10748' MD TO LAUNCH
WIPER PLUG.
- PRESSURE UPON WIPER PLUGANDZERO
MM.
- LINER WIPER PLUG SHEARED AT 3400 PSI
(0.3 BBLS)
DISPLACE LINER WIPER PLUG
-22.1 BBLS DISPLACEDAT 1.5 BPM: 2500 PSI
- PLUG BUMPEDAT 22.1 BBLS, 4000 PSI (22.1
BBLS CALCULATED)
- OPEN PUMP BLEED AND CHECK FLOATS,
GOOD TEST.
- CLOSE PUMP BLEED, PRESSURE UP TO
1500 PSI ON COIL, PICK UP AND CONFIRM
PRESSURE DROP
- CIRCULATE 10 BBLS EXHAUST PILL PRIOR
TO COMPLETELY UNSTINGING FROM LINER
- 3.29 BPM IN 13,11 BPM OUT. JET 800' OF
TUBING AT 25 FPM
- CEMENT IN PLACE: 00:00 HRS
50.2 BBLS CEMENT BEHIND PIPE, BASED ON
MANUALSTRAP.
- TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE. 0.6 BBLS 1.
Printed 9/19/2019 10:03:27AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-37
Event Type: COM- ONSHORE (CON)
Project: PBU — -
Start Date. 8/252019 End Date:
Site: 11 -- _
Rig Name/No.: CDR -2
Spud DatelTime: 11/7/1996 12:00:OOAM
AFE No
Page 5 of 8
(1,229,063,00)
Rig Contractor. NABORSALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usft (above Mean Sea Level)
Date From - To
Him
Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
8/272019 0000 - 0430
4.50
CASING
P 10,775.00
RUNPRD
PLUG BUMPED AT CALCULATED VOLUME OF
22.1 BBLS
- BLEED PRESSURE OFF COILAND VERIFIED
FLOATS HOLDING
- PRESSURE UP AND PU TILL PRESSURE
DROPPED. IMMEDIATELY COME ONLINE
WITH PUMP. CIRCULATED 10 BBLS THEN
JETTED UP THE 800' MD THAT CEMENT
COULDN.T CAME UP TO.
BRING RATE UP TO 3.38 BPM IN RATE. GOOD
INDICATION ON OUT DENSITY OF
EXHAUSTED CEMENTAND CEMENT THAT,
CAME OVER LINER TOP. EXHAUST PILL
FROM LINER TOP TO 6800' MD.
- 3.38 BPM IN RATE 13.00 BPM OUT RATE
- 8.38 PPG IN 18.30 PPG OUT
PAINTED YELLOW FLAG 61
- PERFORM 10 MIN FLOW CHECK AT 100'
FROM SURFACE. PJSM FOR BHA LAY DOWN
- LAY 6 JOINTS OF 2-3/8" BTS -6 DOWN. LAY
•
DOWN LINER RUNNING TOOL. 3/4" STEEL
BALL RECOVERED
04:30 - 0600
1.50
CASING
P 10,775.00
OTHCMP
MAKEUP NOZZLE, JET STACK.
MAKE UP SLIM CONNECTOR, PULL TEST TO
50K GOOD.
06.00 - 09:00
3.00
BOPSUR
P 10,775.00
OTHCMP
VAC OUT STACK.
REMOVE DRILLING RISER, INSTALL BOP
TEST RISER.
GREASE CREW SERVICE TREE VALVES.
PUMP AND PURGE THROUGH ALL LINES.
09:00 - 09:30
0.50
BOPSUR
P 10,775.00
OTHCMP
LINE UP TO SHELL TEST BOPS.
PRESSURE UP TO 4000 PSI, GREASE FITTING
IS LEAKING ON ONE OF THE CHOKE VALVES.
09:30 - 0945
0.25
BOPSUR
P 10,775.00
OTHCMP
SAFETY STAND DOWN, MEETING WITH RIG
I
CREW TO DISCUSS SALE OF PRUDHOE BAY
_
FIELD TO ANOTHER OPERATOR_
0945 - 1200
2.25
BOPSUR
P 10,775.00
OTHCMP
CONTINUE SHELLTEST.
TROUBLESHOOT PRESSURE LOSS.
SHUT IN SECOND MASTER VALVE. GET
GOOD SHELL TEST.
Printed 9/192019 10:03:27AM **All depths reported in Drillers Depths*'
North America - ALASKA - So
Operation Summary Report
—--- —
Common Well Name: 11-37
Event Type: COM -ONSHORE (CON) Start Date: 025/2019 End Date:
Project: PBU Site: it
Active datum: K8 @53.50usft (above Mean Sea Level)
Date From - To Him Task
(hr)
12:00 - 19:30 7.50 BOPSUR
19:30 - 00:00 4.50 PERF
8/28/2019
00:00
- 01:00
1.00
PERF
OTHCMP TEST BOPS AS PER BP AND AOGCC
01.00
- 04:30
3.50
PERF
04:30 - 08:00 3.50 PERF
Page 6 of 8
AFE No
+S4DW0019G5-EX-Di-RN- (1,229,063.00)
BPUOI: USA00001243
Code NPT Total Depth
Phase Description of Operations
(usft)
P 10,775.00
OTHCMP TEST BOPS AS PER BP AND AOGCC
GUIDELINES. AOGCC WITNESS JEFF JONES
ALL TESTS TO 250 / 3500 PSI.
TEST I: IRV, CT PACKOFF - PASS
'TEST 2: BLIND / SHEARS, RI,BLlA,BI,B4-
PASS
TEST 3: ANNULAR (2-3/8"), TIW #1, B3, B2,
BL1 - PASS
TEST 4: UPPER 2-3/8" PIPE/ SLIPS, TIW #2,
BL2, R2, T2, C15 -FAIL R2. GREASE AND
'RE -TEST. FAILON TIW#2, FUNCTIONAND
RE -TEST, GOOD.
FAIL/PASS ON TIW#2, R2.
TEST 5: C16, T1, C11 - PASS
TEST 6: VBR (2-3/8"), C7, C9, C10, TV2
TROUBLESHOOT
TEST 6: C7, C9, C10. C10 FAIL/ PASS
TEST: VBR (2-318"), C5, C6, C8,TV2 PASS
TEST: CHOKE A, CHOKE C PASS
TEST: 2-3/8" PIPE /SLIPS, TV1, C1, C4 PASS
TEST: C2, C3 PASS
ACCUMULATOR DRAWDOWN
'TEST: C9/ C10 BACKWARDS PASS
P `10,775.00
OTHCMP RIG DOWN TEST EQUIPMENT.
PULL TEST RISERS AND INSTALL DRILLING
RISERS. TEST TO 3500# PASS
CIRCULATED COIL BACK TO 1 %KCL. OPEN
WELL TO CLOSED CHOKE, FILL WELL WITH
1.2 BBLS.
PERFORM A FAILING LINER LAP TO 2400#,
WELL BROKE OVER AT 2425#, LLR OF 0.25
BPM @ 2012#
FLOWCHECKWELL. WELLSTATIC
MAKE UP NORTHERN SOLUTION SWIVEL. PT
TO 3500#
BRING HALLIBURTON HANDLING EQUIPMENT
TO THE FLOOR
_
P 10,775.00
OTHCMP RIG UP HANDLING EQUIPMENT. VERIFY GUN
LAYOUT
PJSM FOR MAKING UP PERF GUNS
P 10,775.00
OTHCMP MU PERFORATING GUNS
- MAKE UP MAXFIRE FIRING HEAD
- MAKE UP (35) 2" PERF GUNS
- MAKE UP OWEN BALL DROP FH 12 BALL.
VERIFIED
-XO, 5/8" HIGHLOAD DISCONNECT
-MAKE UP 1-1/4" CSH (20) JOINTS
-3/4" HIGHLOAD DISCONNECT WITH
CROSSOVERS.
-DBPV
- (2) 2-1/16' CSH HYDRIL
- MAKE UP INJECTOR. TEST QTS TO 3500#
P 10 775.00
OTHCMP RIH WITH PERF BHA#11.
SLOW DOWN AT LINER TOP.
UP WEIGHTAT 10600'[S 50K.
LIGHT TAG AT 10768'.
STOP AND CORRECT DEPTH TO PBTD OF
10754.8'
Printed 9/192019 10:0327AM **All depths reported in Drillers Depths"
Common Well Name: 11-37
Event Type: COM- ONSHORE (CON)
Project: PBU
Rig Name/No.: CDR -2
Active datum: KB @53.50usfl (aoo
Date From - To
08:00 - 13:00
North America - ALASKA- BP
Operation Summary Report
__._. AFE No
Start Date: 8/252019 End Date:
Site: 11
Mean Sea Level)
Him Task
(hr)
5.00 PERF
Code NPT
P
13:00 - 20:00 7.00 PERF P
Page 7 of 8
:-Di-RN- (1,229,063.00 )
BPUOI: USA00001243
Total Depth
Phase Description of Operations
(usR)
10,775.00
OTHCMP PICKUP ABOVE SHOT DEPTH,
APPLY 125 PSI WHP AND START PUMP/
MOVEMENT SEQUENCE TO ACTIVATE FIRING
HEAD.
AFTER FINAL MOVEMENT GET ON DEPTH,
PLACE BULL PLUG AT 10590.7'.
GET GOOD SHOT INDICATION FROM
ACOUSTIC AND FLUID LOSS.
PERFORATED INTERVALS:
9445'-9673'
'
10548'-1�—
PUT 250 PSI WHP AND POOH. KEEP SPEED <
50 FT/MIN WHILE INSIDE LINER.
10 MIN FLOWCHECKAT LINER TOP IS GOOD,
NO FLOW.
CONTINUE POOH.
AT SURFACE PERFORM 2000' JOG OUT TO
TIGER TANK. GET SOME LIGHT RETURNS
BACK FOR ABOUT 5 BBLS THEN CLEANS UP.
PURGE RISER, CONTINUE POOH.
NEAR SURFACE, CONDUCT 20 MIN FLOW
'CHECK WHILE PJSM WITH HES AND RIG
CREW FOR UD PERF GUNS. _
10,775.00
OTHCMP OPEN RISER AND INSPECT LAST 100' OF CT.
!
NO FLAT SPOTS SEEN.
UD 2 JTS OF 2-1/16" CSH.
UD 19 JTS OF 1-1/4" CSH. FILL WELL EVERY
10 JTS.
WHEN PICKING UP LAST JOINT OF 1-1/4"
GETTING CO GAS READINGS ON THE FLOOR,
SOME BUBBLING SEEN IN THE STACK
M/U SAFETY JTAND SPACE OUT, CLOSE
ANNULAR.
CIRCULATE 5 BBLS OUT TO TIGER TANK
THAN OBSERVE FLUID, ONLY SLIGHT
BUBBLING NOW. ZERO GAS READINGS.
CONTINUE UD PERF GUNS. FILL WELL
EVERY 20 MIN.
AFTER 11 GUNS UD INTO A LONG BLANK
SECTION. TRAPPED PRESSURE IN THE
CONNECTIONS.
WHILE BREAKING A CONNECTION,
PERSONAL 1-12S MONITOR SHOWS A
READING OF 8 PPM H2S IN ADDITION TO CO
READING.
MAKE UP SAFETY JOINTAND RUN IN, CLOSE
ANNULAR.
DISCUSS WITH HES TCP REPS, WSUP AND
ACTING WOM, DECISION IS MADE TO CIRC
ACROSS TOP OUT TO TIGER TANK FOR
AWHILE AND LET PRESSURE DISSIPATE.
RIG DOWN SAFETY JOINT
LAY DOWN PERF GUNS -ALL GUNS FIRED AS
PER PLAN
RIG DOWN HALLIBURTON AND CLEAN RIG
FLOOR
Printed 9/192019 10:03:27AM **All depths reported in Drillers Depths"
Printed 9/19/2019 10:03:27AM "All depths reported in Drillers Depths"
North America -ALASKA
- BP
Page 8 of 8
Operation Summary Report
Common Well Name: 11-37
APE No
Event Type: COM- ONSHORE (CON)
Start Date: 8/25/2019 End Date:
H-S4DW0019G5-EX-DI-RN- (1,229.063.00)
Project: PBU
Site: 11
Rig Name/No.: CDR -2
Spud Dale/Time: 11/7/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001243
Active datum: KB @53.50usR (above Mean Sea Level)
Date From - To Hire
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
_ — (usf)
_
20:00 - 00:00 4.00
RIGD P 10,775.00
POST
RIG DOWN OPERATIONS
-CLOSE MASTER AND SWAB VALVES.
-MAKE UP NOZZLE AND STAB INJECTOR
-DISPLACE COIL TO FRESH WATER
-FLUSH SURFACE LINESAND JET BOPS
-BLOW DOWN COILAND SURFACE LINES.
-WORK THROUGH END OF WELL CHECK
'
_
LIST.
8/29/2019 00:00 - 04:00 4.00
RIGID P 10,775.00
POST
RIG DOWN
-WORK THROUGH RIG DOWN CHECKLIST
-RIG DOWN MPD LINE
'-LEAK TIGHT TEST SWAB AND MASTER
VALVE TO 3500 PSI
-CHANGE OUT RISERS TO TESTING RISERS
'-GREASE BOPS
I -NIPPLE DOWN BOPS
-INSTALLAND LEAK TIGHT TEST TREE CAP
TO 3500 PSI
NOTE RELEASE RIG AT 0400 HRS
NOTE: TUBING 0 PSI, IA 0 PSI, OA 25 PSI AT
RIG DOWN
Printed 9/19/2019 10:03:27AM "All depths reported in Drillers Depths"
Daily Report of Well Operations
PBU 11-37A
T/1/0=0/0/0. (Post CDR2). Set 4" H TWC #438 @130" w/ Lubricator 839. RD CDR2 Tree,
RU Production tree w/ SH 3000. PT'd against TWC 350/5000 PSI (Pass) Charted and
Retained. Pulled 4" H TWC #438 @130". RDMO. ***Job Complete***.
8/29/2019
MV=O, SSV/SVNW=C, IA/OA=OTG.
T/1/0=0/0/0 Freeze Protect TBG.(Post CTD) Freeze Protect TBG. W/ 45 bbls Diesel.
8/29/2019
FWHP=0/0/0
T/1/0=0/0/0. Load and leaktight test flowline/Freeze protect. Pumped 56 bbls DSL down FL
for FP. Pressured up FL to 2000 psi with 3 bbis DSL for leaktight test. Passed closed
9/1/2019
Win /Swab. Hung tag on WV. RDMO.
***WELL S/I ON ARRIVAL*** (CTD)
RAN 3.50" LIB TO DEPLOYMENT SLEEVE @ 7,510' SLM
RAN 45 KB PKR & PTSA DRIFT TO 7510' SLM
RAN X-LINE/X-LOCK/3.5" LIB TO DEPLOYMENT SLEEVE & X -NIPPLE
LOCATE X -NIPPLE @ 7463' SLM (7481' MD, +18' CORR.), TAG DEP SLEEVE AT 7,532'
MD.
SET 45 KB BKR LTP & PTSA w/2-7/8" XX PLUG IN DEP SLEEVE @ 7,532' MD (top of Itp -
7,525' md)
PERFORMED TEST ON LTP TO 2000 PSI.
SET 4 1/2" WHIDDON CATCHER ON LTP @ 7,525' MD
PULLED BK-DGLV'S FROM ST#3 & ST#4
SET BK-LGLV IN ST#4 @ 4,101' MD
9/4/2019
***JOB CONTINUED ON 05 -SEP -2019***
***CONTINUE WSR FROM 9/4/19***
SET BK-OGLV IN ST#3 @ 5,912' MD
PULLED EMPTY CATCHER FROM 7,530' MD
EQUALIZE 2 7/8" XX PLUG @ 7,513' SLM
PULLED 2 7/8" XX PLUG @ 7,513' SLM
DRIFTED 31'x 2.0" DMY GUNS, 1.75" S.BAILER, DEV OUT @ 8,780' SLM
9/5/2019
***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE***
i
North America - ALASKA - BP
PBU
11
11-37
11-37A
Design: 11-37A
500292271601
Final Survey Report
27 August, 2019
�� e
r
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-37
Wellborn:
11-37A
Design:
11-37A
BP
Final Survey Report
Local Co-ordinate Reference:
Well 11-37
ND Reference:
KB @ 53.50usft
MD Reference:
KB @ 53.50usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
She
11, TR -11-15
Latitude:
Site Position:
707,585.650
Northing:
From:
Map
Easting:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
11-37,11-37
Direction
Well Position
+N/ -S 0.00 usft
Northing:
(usft)
.El -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
11-37A
Magnetics
Model Name Sample Date
Declination
(°I
BGGM2018 8/1912019
16.81
Design
11-37A
5,949,527.780
usft
Latitude:
70° 15' 55.850 N
707,585.650
usft
Longitude:
148° 19' 17.134 W
0.000
in
Grid Convergence:
1.58 °
5,951,090.590 usft
708,212.770 usft
29.31 usft
Dip Angle
80 92
Field Strength
(nT)
57,411
Latitude: 70° 16'11.045 N
Longitude: 148° 18' 57.630 W
Ground Level: 27.31 usft
Audit Notes:
Version: 1.0
Phase:
ACTUAL
Tie On Depth:
8,99871
Vertical Section:
Depth From (TVD)
.N/ -S
+El -W
Direction
(usft)
(usft)
(usft)
(I
24.19
0.00
0.00
6.52
8/272019 12:03:46AM
Page 2
COMPASS 5000.1 Build 81D
by
BP
Final Survey Report
Company: North America -ALASKA - BP
Inc
Local Coordinate Reference:
Well 11-37
Project PBU
NIS
TVD Reference:
KB @ 53.50usft
Site: 11
DLeg
MD Reference:
KB @ 53.50usft
Well: 11-37
(usft)
North Reference:
True
Wellbore: 11-37A
(usft)
Survey Calculation Method:
Minimum Curvature
Design: 11-37A
0.00
Database:
EDM RSK - Alaska PROD - ANCPt
Survey Program Date 8126/2019
0.00
0.00
5,951,090.590
From TO
0.00
146.00
0.21
(usft) (usft) Survey (Wellbore)
Tool Name
Description
0.03
146.00 8,565.701: MWD - Standard (11-37)
MWD
MWD - Slandartl
0.17
8,567.00 8,998.71 Survey #1 (11-37APB1)
MWD
MWD -Standard
240.00
9,020.00 10,775.00 Survey #1 (11-37A)
MWD
MWD - Slandartl
5,951,090.699
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
24.19
0.00
0.00
24.19
-29.31
0.00
0.00
5,951,090.590
708,212.770
0.00
146.00
0.21
278.95
146.00
92.50
0.03
-0.22
5,951,090.619
708,212.549
0.17
240.00
0.17
66.76
240.00
186.50
0.12
-0.26
5,951,090.699
708,212.504
0.39
329.00
0.26
45.91
329.00
275.50
0.31
0.00
5,951,090.899
708,212.765
0.13
418.00
0.04
40.78
418.00
364.50
0.47
0.17
5,951,091.068
708,212.926
0.25
509.00
0.34
120.36
509.00
455.50
036
0.42
5,951,090.962
708,213.183
0.37
599.00
0.11
110.17
599.00
545.50
020
0.73
5,951,090.806
708,213.499
0.26
689.00
0.19
14.63
689.00
635.50
0.31
0.85
5951,090.924
708,213.614
0.25
781.00
0.12
73.62
781.00
727.50
0.49
0.98
5,951,091.102
708,213.740
0.18
838.00
0.21
123.30
638.00
784.50
0.44
1.13
5,951,091.066
708,213.886
0.28
932.00
0.19
86.40
932.00
878.50
0.36
1.43
5,951,090.989
708,214.188
0.14
1,026.00
0.55
60.58
1,025.99
972.49
0.59
1.98
5,951,091.236
708,214730
0.41
1,120.00
0.98
41.44
1,119.99
1,066.49
1.42
2.90
5,951,092.085
708,215.631
0.53
1,214.00
1.08
16.62
1,213.97
1,160.47
2.87
3.69
5,951,093.558
708,216.376
0.48
1,309.00
0.59
20.76
1,308.96
1,255.46
4.18
4.12
5,951,094.885
708,216.769
0.52
1,403.00
0.47
247.08
1,402.96
1,349.46
448
3.93
5,951,095.182
708,216.577
1.04
1,495.00
0.60
245.83
1,494.95
1,441.45
4.14
3.15
5,951,094.814
708,215.801
0.14
1,589.00
0.61
245.53
1,588.95
1,535.45
3.73
2.24
5,951,094.379
708,214.909
0.01
1,683.00
0.49
246.17
1,682.94
1,629.44
3.36
1.42
5,951,093.987
708,214.098
0.13
1,777.00
0.46
226.22
1,776.94
1,723.44
2.94
0.76
5,951,093.546
708,213.468
0.18
V. Sec
(usft)
0.00
0.01
0.09
0.31
0.49
0.41
0.28
0.41
0.59 _
0.5'
0.52
0.81
1.74
3.27
4.62
4.90
4.47
3.96
3.50
3.01
8/272019 12:03:46AM Page 3 COMPASS 5000.1 Build 81D
Im
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37A
Survey Calculation Method:
Minimum Curvature
Design:
11-37A
Database:
EDM R5K - Alaska PROD - ANCPt
Survey
MD
Inc
Azi
ND
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
1,870.00
0.56
218.83
1,869.94
1,81644
2.32
0.23
5,951,092 919
708,212.931
0.13
1,902.00
0.83
235.53
1,901.94
1,848.44
2.07
-0.06
5,951,092656
708,212.649
1.05
1,932.00
1.44
251.54
1,931.93
1,878.43
1.83
-0.60
5,951,092.401
708,212.119
2.27
1,964.00
2.30
247.73
1,963.91
1,910.41
1.46
-1.58
5,951,092.003
708,211.154
2.71
1,995.00
3.09
248.05
1,994.88
1,941.38
0.91
-2.93
5,951,091.418
708,209.819
2.55
2,025.00
3.84
251.75
2,024.82
1,971.32
0.29
4.63
5,951,090.754
708,208.133
2.61
2,056.00
4.63
253.68
2,055.74
2,002.24
-0.38
-6.82
5,951,090.017
708,205.966
2.59
2,088.00
5.15
257.75
2,087.62
2,034.12
-1.05
-9.46
5,951,089.277
708,203.343
1.95
2,119.00
5.55
256.85
2,118.49
2,064.99
-1.69
-12.28
5,951,088.563
708,200.542
1.32
2,146.00
5.61
259.07
2,145.36
2,091.86
-2.24
-14.85
5,951,087.945
708,197.991
0.83
2,245.00
5.80
260.62
2,243.87
2,190.37
-3.97
-24.53
5,951,085.945
708,188.357
0.25
2,339.00
6.08
261.10
2,337.36
2,283.86
-5.51
-34.14
5,951,084.136
708,178.799
0.30
2,433.00
6.26
260.97
2.430.82
2r377 32
-7.09
-44.12
5,951,082.286
708,168.868
0.19
2,527.00
6.22
281.29
2,524.26
2,470.76
-8.66
-54.21
5,951,080.432
708,158.821
0.06
2,620.00
6.19
262.96
2,618.72
2,56322
-10.04
-64.17
5,951,078.779
708,148.907
0.20
2,712.00
5.94
264.61
2,708.20
2,654.70
-11.10
-73.63
5,951,077.457
708,139.278
0.33
2,805.00
5.66
265.21
2,800.73
2,747.23
-11.93
-83.19
5,951,078.364
708,129.945
0.31
2,899.00
5.19
263.39
2,894.30
2,840.80
-12.81
-92.03
5,951,075.243
708,121.130
0.53
2,991.00
5.23
263.81
2,985.92
2,932.42
-13.75
-100.33
5,951,074.068
708,112.859
0.05
3,085.00
4.79
261.79
3,079.57
3,026.07
-14.79
-108.48
5,951,072.806
708,104.749
0.50
3,116.00
4.23
267.14
3,110.47
3,056.97
-15.03
-110.90
5,951,072.497
708,102.334
2.26
3,148.00
3.61
273.18
3,142.39
3,088.89
-15.03
-113.08
5,951,072.434
708,100.151
2.33
3,177.00
3.09
277.38
3,171.34
3,117.64
-14.88
-114.77
5,951,072.538
708,098.461
1.98
3,205.00
2.16
285.00
3,200.31
3,146.81
-14.64
-116.07
5,951,072.744
708,097.151
3.42
3,240.00
1.22
302.78
3,234.30
3,180.80
-14.28
-117.00
5,951,073.080
708,096.218
3.13
3,271.00
0.69
327.02
3,265.30
3,211.80
-13.94
-117.38
5,951,073405
708,095.830
2.11
3,300.00
0.60
354.84
3,294.29
3,240.79
-13.65
-117.49
5,951,073.699
708,095.713
1.11
V. Sec
(usft)
2.3'
2.05
1.75
1.27
0.57
-0.24
-1.16
-2.12
-3.07
-3.91
-6.73
-9.35
-12.05
-14.76
-17.26
-19.4'
-21.29
-23.17
-25.05
-27.01
-27.52
-27.77
-27.81
-27.72
-27.47
-27.18
-26.89
8272019 12: 03 46A Page 4 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America -
ALASKA
- BP
Local Coordinate
Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KS @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37A
Survey Calculation Method:
Minimum Curvature
Design:
11-37A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
An
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft(
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
3,33100
0.80
353.64
3,325.29
3,271.79
-13.27
-117.52
5,951,074.075
708,095.665
0.65
-26.52
3,424.00
0.69
203.17
3,418.29
3,364.79
-13.14
-117.81
5,951,074.198
708,095.372
1.55
-26.42
3,518.00
1.02
197.24
3,512.28
3,458.78
-14.46
-118.28
5,951,072.866
708,094.938
0.36
-27.79
3,612.00
0.94
204.98
3,606.26
3,552.76
-15.96
-118.86
5,951,071.352
708,094.406
0.16
-29.34
3,705.00
0.94
209.71
3,699.25
3,645.75
-17.31
-119.56
5,951,069.980
708,093.743
0.08
-30.77
3,765.00
0.93
197.59
3,759.24
3,705.74
-18.20
-119.95
5,951,069.078
708,093.377
0.33
-31,70
3,858.73
0.94
202.91
3,852.96
3,799.46
-19.64
-120.48
5,951,067.630
708,092.888
0.09
-33.18
3,951.07
0.82
204.28
3,945.29
3,891.79
-20.94
-121.04
5,951,066.315
708,092.357
0.13
-34.54
4,045.96
0.71
203.11
4,040.19
3,986.69
-22.10
-121.55
5,951,065.142
708,091.880
0.12
-35.75
4,140.25
0.83
331.90
4,134.46
4,080.96
-22.03
-122.11
5,951,065.192
708,091.327
1.47
-35.75
4,234.50
0.84
326.26
4,228.70
4,175.20
-20.85
-122.81
5,951,066.348
708,090.590
0.09
-34.66
4,326.53
0.87
329.21
4,320.72
4,267.22
-19.69
-123.54
5,951,067.489
708,089.826
0.06
-33.591
4,418.88
0.71
338.24
4,413.08
4,359.56
-18.56
-124.11
5,951,068.606
708,089.224
0.22
-32.52
4,511.16
0.69
330.73
4,505.33
- 4,451.83
-17.54
-124.60
5,951,069.608
708,088.712
0.10
-31.57
4,601.98
0.76
338.20
4,596.12
4,542.62
-16.51
-125.09
5,951,070.630
708,088.193
0.13
-30.60
4,692.72
0.64
338.70
4,686.88
4,633.38
-15.48
-125.50
5,951,071.649
708,087.757
0.13
-29.8:
4,786.64
0.49
323.08
4,780.79
4,727.29
-14.87
-125.93
5,951,072.447
708,087.303
0.23
-28.86
4,879.96
0.56
326.36
4,874.11
4,820.61
-13.97
-126.42
5,951,073.132
708,086.791
0.08
-28.22
4,971.48
0.72
333.96
4,965.62
4,912.12
-13.08
-126.92
5,951,074.006
708,086.267
0.20
-27.40
5,063.09
0.51
315.39
5,057.23
5,003.73
-12.27
-127.46
5,951,074.798
708,085.705
0.31
-2666
5,153.37
0.30
329.36
5,147.51
5,094.01
-11.78
-127.86
5,951,075.277
708,085.289
0.26
-26.22
5,246.91
0.34
322.78
5,241.04
5,187.54
-11.35
-128.15
5,951,075.700
708,084.985
0.06
-25.82
5,341.82
0.45
325.50
5,335.95
5,282.45
-10.82
-128.54
5,951,076.221
708,084.589
0.12
-25.34
5,434.08
0.38
315.51
5,428.21
5,374.71
-10.30
-128.96
5,951,076.726
708,084.155
0.11
-24.87
5,528.44
0.33
308.50
5,522.57
5,469.07
-9.91
-129.39
5,951,077.106
708,083.713
0.07
-24.53
5,625.30
0.63
320.53
5,619.42
5,565.92
-9.32
-129.94
5,951,077.675
708,083.140
0.33
-24.01
5,721.79
0.51
318.40
5,715.91
5,662.41
-8.59
-130.57
5,951,078.388
708,082.498
0.13
-23.36
8/272019 12:03:46AM Page 5 COMPASS 5000.1 Build 81D
fW"�M
BP
Final Survey Report
Company; North America -
ALASKA -
BP
Local Co-ordinate
Reference:
Well 11-37
Project: PBU
TVD Reference:
KB @ 53.50usft
Site: 11
MD Reference:
KB @ 53.50usft
Well: 11-37
North Reference:
True
Wellbore: 11-37A
Survey Calculation Method:
Minimum Curvature
Design: 11-37A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
Azi
ND
TVDSS
NIS
ENV
Northing
Eas0ng
DLeg
V. Sec
(usft) (1)
(1)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°110ousft)
(usft)
5,818.46
0.83
323.36
5,812.57
5,759.07
-7.71
-131.27
5,951,079.252
708,081.770
0.34
-22.5f
5,913.82
0.81
78.56
5,907.93
5,854.43
-7.02
-131.02
5,951,079.946
708,081.999
1.45
-21.85
6,010.56
0.72
61.46
6,004.66
5,951.16
-6.60
-129.82
5,951,080.405
708,083.191
0.25
-21.29
6,106.81
0.67
48.38
6,100.90
6,047.40
-5.93
-128.87
5,951,081.094
708,084.124
0.17
-20.52
6,202.11
1.11
75.38
6,196.19
6,142.69
-5.33
-127.56
5,951,081.733
708,085.417
0.63
-19.77
6,297.56
1.13
72.44
6,291.62
6,238.12
-4.81
-125.76
5,951,082.300
708,087.194
0.06
-19.06
6,393.36
0.98
56.79
6,387.41
6,333.91
-4.08
-124.18
5,951,083.077
708,088.759
0.34
-18.15
6,488.94
1.23
114.70
6,482.97
6,429.47
-4.06
-122.56
5,951,083.141
708,090.374
1.14
-17.94
6,521.18
1.25
119.30
6,515.20
6,461.70
-4.38
-121.94
5,951,082.841
708,091.003
0.31
-18.19
6,553.24
1.18
119.25
6,547.26
6,493.76
-431
-121.35
5,951,082.526
708,091.605
0.22
-18.45
6,585.66
1.10
126.33
6,579.67
6,526.17
-5.06
-120.81
5,951,082.193
708,092.156
0.50
-18.73
6,617.79
0.69
124.51
6,611.80
6,558.30
-5.35
-120.40
5,951,081.912
708,092.572
1.26
-18.98
6,649.08
0.24
159.40
6,648.09
6,589.59
-5.52
-120.22
5,951,081.749
708,092.755
1.64
-19.13
6,681.42
1.49
257.13
6,675.42
6,621.92
-8.67
-120.61
5,951,081.582
708,092.373
4.76
-19.33
6,713.55
3.12
266.21
6,707.52
6,654.02
-5.83
-121.89
5,951,081
395
708,091.098
5.18
-19.621
6,744.76
4.11
274.15
6,738.67
6,685.17
-5.80
-123.85
5,951,081.366
708,089.135
3.55
-19.87
6,776.99
5.16
273.03
6,770.80
6,717.30
-5.64
-126.45
5,951,081.454
708,086.533
3.27
-19.95
6,810.45
6.48
270.02
6,804.08
6,750.58
-5.56
-129.84
5,951,081.440
708,083.141
4.05
-20.26
6,841.16
7.44
269.16
8,834.57
6,781.07
-5.59
-133.56
5,951,081.309
708,079.423
3.14
-20.71
6,873.37
7.92
266.25
6,868.49
6,812.99
-5.76
-137.86
5,951,081.014
708,075.130
1.92
-21.37
6,904.51
8.38
265.86
6,897.31
6,843.81
-6.07
-142.26
5,951,080.589
708,070.736
1.49
-22.18
6,936.70
9.08
263.65
6,929.13
6,875.63
-6.52
-147.13
5,951,080.004
708,065.887
2.41
-23.17
6,969.68
10.15
264.24
6,961.65
6,908.15
-7.10
-152.61
5,951,079.273
708,060.427
3.26
-24.37
7,000.82
11.68
260.69
6,992.22
6,938.72
-7.88
-158.45
5,951,078.327
708,054.610
5.36
-25.82
7,032.96
13.08
256.89
7,023.61
6,970.11
-9.24
-165.20
5,951,076.789
708,047.898
5.04
-27.92
7,065.11
12.52
259.08
7,054.97
7,001.47
-10.72
-172.16
5,951,075.112
708,040.977
2.30
-30.19
7,096.01
14.67
254.76
7,085.00
7,031.50
-12.38
-179.23
5,951,073.254
708,033.961
7.69
-32.64 1
827/2019 12:03:46AM
Page 6
COMPASS
5000.1 Build 610
RE
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.51
Site:
11
MD Reference:
KB @ 53.50usR
Well:
11-37
North Reference:
True
Wellbore:
11-37A
Survey Calculation
Method:
Minimum Curvature
Design:
11-37A
Database:
EDM i - Alaska
PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
I
Northing
Easting
DLeg
V. Sec
(usft) (1)
(1)
(usft)
(usft)
(usft)
(waft)
(usft)
(usft)
(9100uaft)
(usft)
7,127.49
15.49
254.22
7,115.39
7,061.89
-14.57
-187.12
5951 070 845
708,026.134
2.64
-35T
7,157.70
16.26
253.35
7,144.45
7,090.95
-16.88
-195.05
5,951,068.318
706,018.267
2.67
-38.91
7,190.03
17.23
251.11
7,175.41
7,121.91
-19.73
-203.92
5,951,065.227
708,009.483
3.60
-42.75
7,222.24
18.32
250.90
7,206.08
7,152.58
-22.93
-213.22
5,951,061.770
708,000.278
3.39
-46.98
7,254.35
19.15
250.44
7,236.49
7,182.99
-26.35
-222.95
5,951,058.088
707,990.645
2.63
-51.48
7,285.79
19.35
250.90
7,266.17
7,212.67
-29.78
-232.73
5,951,054.388
707,980.963
0.80
-56ol)
7,318.20
19.75
254.85
7,296.72
7,243.22
-32.97
-243.09
5,951,050.914
707,970.696
4.26
-60.34
7,350.30
19.81
259.87
7,326.93
7,273.43
-35.34
-253.68
5,951,048.248
707,960.178
5.29
-63.90
7,382.10
20.50
262.65
7,356.78
7,303.28
-37.00
-264.51
5,951,046.289
707,949.399
3.71
-66.781
7,413.27
20.64
263.19
7,385.96
7,332.46
-38.35
-275.38
5,951,044.639
707,938.573
0.76
-69.35
7,445.60
20.17
264.45
7,416.26
7,362.76
-39.56
-286.58
5,951,043.115
707,927.406
1.99
-71.83
7,477.17
20.71
263.53
7,445.84
7,392.34
-40.72
-297.55
5,951,041.657
707,916.478
1.99
-74.23
7,509.39
21.06
266.22
7,475.95
7,422.45
-41.74
-308.96
5,951,040.317
707,905.074
3.17
-76.54
7,542.17
20.86
265.14
7,506.56
7,453.06
-42.63
320.68
5,951,039.112
707,893.411
1.33
-78.74
7,574.13
20.52
265.22
7,536.46
7,482.96
-43.58
-331.93
5,951,037.852
707,882.191
1.07
-80.96
7,606.37
20.96
264.57
7,566.61
7,513.11
44.59
-343.30
5,951,036.521
707,870.852
1.54
-83.2r
7,638.55
21.06
268.10
7,596.65
7,543.15
-45.53
-354.80
5,951,035.266
707,859.385
1.73
-85.50
7,671.79
21.02
265.80
7,627.67
7,574.17
46.37
-366.70
5,951,034.094
707,847.509
0.35
-87.69
7,705.50
21.68
26484
7,659.07
7,605.57
47.38
-378.93
5,951,032.753
707,835.311
2.22
-90.07
7,737.18
23.35
264.26
7,688.33
7,634.83
48.53
-391.01
5,951,031.265
707,823.273
5.32
-92.59
7,768.30
23.48
265.32
7,716.89
7,663.39
-49.65
-403.32
5,951,029.803
707,810.994
1.42
-95.10
7,800.06
23.32
264.49
7,746.04
7,692.54
-50.77
415.89
5,951,028.336
707,798.467
1.15
-97.64
7,894.02
20.67
266.50
7,833.15
7,779.65
-53.57
-450.96
5,951,024.568
707,763.489
2.93
-104.40
7,926.22
19.80
265.98
7,863.37
7,809.87
-54.30
-462.07
5,951,023.532
707,752.401
2.76
-106.39
8,021.69
20.10
262.92
7,953.11
7,899.61
-57.46
-494.48
5,951,019.481
707,720.092
1.14
-113.20
8,117.73
2127
265.35
8,042.96
7,989.46
-60.90
-528.22
5,951,015.103
707,686.461
1.51
-120.46
8,214.45
22.00
267.52
1
8,079.37
-63.11
-563.81
5,951,011.913
707,650.952
1.12
-126.69
8272019 12: 03 46A Page 7 COMPASS 5000.1 Build 81D
2,4H
x by
ti
BP
Final Survey Report
Company:
North America ALASKA- BP
Local Co-ordinate Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usR
Well:
11-37
North Reference:
True
Wellbore:
11-37A
Survey Calculation Method:
Minimum Curvature
Design:
11-37A
Database:
EDM R5K - Ataska PROD - ANCPI
Survey
MD Inc
Azi
TVD
WOES
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usR)
(usR)
(usR)
(usft)
(usR)
(usR)
(°/100usft)
(usft)
8,308.88
2007.
267.12
8,221.00
8,167.50
-64.69
-597.66
5,951,009.398
707,617.154
2.05
-132.1(
8,340.23
1942.
267.41
8,250.51
8,197.01
-65.19
-608.24
5,951,008.600
707,606.594
2.10
-133,80
8,372.84
17.78
271.76
8,281.41
8,227.91
-65.29
-618.64
5,951,008.220
707,596.207
6.58
-135.071
8,404.77
15.44
285.96
8,312.02
8,258.52
-63.97
-627.60
5,951,009.291
707,587.210
14.62
-134.781
8,436.68
14.30
303.65
8,342.88
8,289.38
-60.61
-634.97
5,951,012.439
707,579.752
14.61
-132.28
8,468.88
13.19
315.92
8,374.16
8,320.66
-55.77
-640.84
5,951,017.118
707,573.753
9.67
-128.14
8,501.16
14.19
326.93
8,405.53
8,352.03
-49.81
-645.56
5,951,022.947
707,568.869
8.63
-122.75
8,533.36
15.36
338.62
8,436.67
8,383.17
-42.53
-649.27
5,951,030.122
707,564.960
9.93
-115.94
8,565.70
16.11
353.26
8,467.81
8,41431
-34.08
-651.36
5,951,038.508
707,562.638
12.46
-107.78
8,567.00
16.19
353.77
8,469.06
8,415.56
-33.72
-651,40
5,951,038.866
707,562.587
12.53
-107.43.
8,595.22
19.09
351.00
8,495.95
8,442.45
-25.25
-652.55
5,951,047.302
707,561.204
10.70
-99.14.
8,625.30
27.00
350.00
8,523.61
8,470.11
-13.65
-654.51
5,951,058.844
707,558.926
26.33
-87.84
8,655.77
35.90
349.00
8,549.58
8,496.08
1.97
-657.42
5,951,074.369
707,555.584
29.26
-72.66
8,685.40
45.15
349.00
8,572.08
8,518.58
2044
-661.09
5,951,093.138
707,551.394
31.22
-54.32
8,715.89
55.17
348.86
8,591.58
8,538.08
43.79
-665.58
5,951,115.949
707,546.269
32.87
-32.031
8,745.64
65.80
353.64
8,606.23
8,552.73
69.34
-669.45
5,951,141.380
707,541.689
38.35
-7.0'
8,767.81
73.45
357.48
8,613.94
8,560.44
90.04
-671.04
5,951,162.029
707,539.527
38.13
13.301
6,795.38
78.03
6.57
8,620.74
8,567.24
116.70
-670.08
5,951,188.708
707,539.754
36.00
39.90
8,822.37
77.43
9.70
8,626.48
8,572.96
142.81
-666.35
5,951,214.905
707,542.761
11.55
66.26
8,848.04
77.15
11.86
8,632.13
8,578.63
167.41
-661.66
5,951,239.621
707,546.761
8.28
91.23
8,880.52
76.74
13.77
8,639.47
8,585.97
198.26
-654.65
5,951,270.653
707,552.922
5.87
122.68
8,910.96
76.83
15.88
8,646.43
8,592.93
226.90
-647.07
5,951,299.496
707,559.708
6.75
152.00
8,940.84
76.70
18.56
8,653.27
8,599.77
254.68
-638.46
5,951,327.502
707,567.546
8.74
180.58
8,970.82
77.40
21.05
8,659.99
8,606.49
282.17
-628.56
5,951,355.250
707,576.680
8.42
209.01
8,998.71
78.31
23.50
8,665.86
8,612.36
307.40
-618.22
5,951,380.753
707,586.313
9.19
235.25
Tie-in to 1137AP137
8272019 12: 03:46AM
Page 8
COMPASS
5000.1 Build SID
RES
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-37
Wellbore:
11-37A
Design:
11-37A
Survey
MD
Inc
(usft)
(°)
9,020.00
78.22
Kick -Off Point / Top
of Billet
9,050.37
81.62
9,081.08
81.15
9,110.65
80.16
9,142.27
78.73
9,170.45
75.97
9,200.52
71.85
9,230.65
69.75
9,260.59
68.45
9,290.32
70.54
9,322.40
74.64
9,350.13
78.46
9,380.25
80.62
9,410.38
80.22
9,441.57
80.69
9,472.82
83.66
9,500.38
86.22
9,530.76
88.89
9,560.27
91.69
9,590.64
91.90
9,620.62
90.95
9,650.52
91.41
9,68045
90.95
9,710.16
89.79
9,740.55
89.82
9,770.30
87.95
BP
Final Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 11-37
KB @ 53.50usft
KB @ 53.50usft
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Azi
TVD
TVDSS
NIS
FEW
Northing
Easting
DI -eq
V. Sec
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
25.20
8670.19
8,616.69
326.39
-609.63
5,951,399.973
707,594.379
7.84
255.0'
26.08
8,675.50
8,622.00
353.34
-596.69
5,951,427.271
707,606.566
11.54
283.34
22.84
8,680.10
8,626.60
380.97
-584.12
5,951,455.241
707,618.367
10.54
312.22
19.51
8,684.91
8,631.41
408.18
-573.58
5,951,482.723
707,628.149
11.61
340.44
16.06
8,690.70
8,637.20
437.77
-564.08
5,951,512.566
707,636.822
11.64
370.92
14.89
8,696.87
8,643.37
464.27
-556.75
5,951,539.254
707,643.422
10.60
398.08
15.05
8,705.20
8,651.70
492.17
-549.28
5,951,567.354
707,650.109
13.68
426.65
16.56
8,715.11
8,661.61
519.55
-541.54
5,951,594.934
707,857.095
8.45
454.73
19.30
8,725.79
8,672.29
546.16
-532.93
5,951,621.769
707,664.962
9.59
482.15
22.26
8,736.20
8,682.70
572.19
-523.05
5,951,648.059
707,674.120
11.68
509.13
25.86
8,745.80
8,692.30
600.12
-510.56
5,951,676.328
707,685.826
16.67
538.30
28.85
8,752.25
8,698.75
624.06
-498.17
5,951,700.604
707,697.552
17.31
563.49
33.70
8,757.72
8,704.22
649.37
-482.80
5,951,726.322
707,712.220
17.38
590.38
36.93
8,762.74
8,709.24
673,61
465.62
5,951,751.026
707,728.714
10.65
616.41
40.11
8,767.91
8,714.41
697.67
446.47
5,951,775.607
707,747.194
10.17
642.41 -
43.45
8,772.17
8,718.67
720.75
425.85
5,951,799.245
707,767.170
14.23
667.76
46.33
8,774.60
8,721A0
740.19
-406.47
5,951,819.217
707,785.996
13.95
689.28
50.03
8,775.90
8,722.40
760.42
-383.86
5,951,840.067
707,808.041
15.01
711.95
53.82
8,775.75
8,722.25
778.62
-360.64
5,951,858.895
707,830.751
15.97
732.66
57.71
8,774.79
8,721.29
795.69
-335.55
5,951,876.655
707,855.359
12.82
752.47
60.99
8,774.05
8,720.55
810.97
-309.77
5,951,892.638
707,880.705
11.39
770.57
63.38
8,773.43
8,719.93
824.92
-283.33
5,951,907.312
707,906.745
8.14
787.43
60.09
8,772.82
8,719.32
839.08
-256.98
5,951,922.203
707,932.694
11.10
804.50
57.08
8,772.62
8,719.12
854.57
-231.63
5,951,938.381
707,957.806
10.86
822.76
52.26
8,772.73
8,719.23
872.13
-206,84
5,951,956.623
707,981.898
15.79
843.02
49.06
8,773.31
8,719.81
890.98
-183.83
5,951,976.100
708,004.370
12.51
864.36
8272019 12:03:46AM Page 9 COMPASS 5000 1 Build 81D
am e
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 11-37
Project: PBU
TVD Reference:
KB @ 53.50usft
Site: 11
MD Reference:
KB @ 53.50usft
Well: 11-37
North Reference:
True
Wellbore: 11-37A
Survey Calculation
Method:
Minimum Curvature
Design: 11-37A
Database:
EDM R5K - Alaska
PROD - ANCP7
Survey
MD
Inc An
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°) V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(Wousft)
(usft)
9,800.38
88.28
45.40
8,774.30
8,720.80
911.39
-161.77
5,951,997.113
708,025.862
12.21
887.1/
9,830.48
90.21
40.11
8,774,69
8,721.19
933.48
-141.34
5,952,019.759
708,045.665
18.71
911.41
9,860.53
91.57
37.60
8,774.23
8,720.73
956.88
-122.50
5,952,043.666
708,063.858
9.50
936.79
9,890.45
89.39
36.51
8,773.98
8,720.48
980.75
-104.47
5,952,068.029
708,081.217
8.15
962.56
9,925.72
87.21
36.14
8,775.02
8,721.52
1,009.16
-83.59
5,952,096.996
708,101.304
8.27
993.15
9,950.86
87.42
33.92
8,776.20
8,722.70
1,029.72
-69.17
5,952,117.948
708,115.143
8.86
1,015.21
9,980.56
85.91
28.88
8,777.93
8,724.43
1,055.02
-53.73
5,952,143.662
708,129.880
17.69
1,042.10
10,010.75
89.32
26.19
8,779.19
8,725.69
1,081.76
-39.79
5,952,170.778
708,143.074
14.38
1,070.25
10,039.91
91.60
29.00
8,778.95
8,725.45
1,107.60
-26.28
5,952,196.978
708,155.858
12.41
1,09746
10,069.15
89.94
29.58
8,776.56
8,725.06
1,133.09
-11.98
5,952,222.861
708,169450
6.01
1,12441
10,100.61
91.63
32.99
8,778.13
8,724.63
1,159.97
4.35
5,952,250.179
708,185.032
12.10
1,152.97
10,131.05
93.84
34.25
8,776.87
6,723.17
1,185.29
21.18
5,952,275.951
708,201.157
8.35
1,180.04
10,160.54
93.96
37.25
8,774.67
8,721.17
1,209.16
38.37
5,952,300.292
708,217.677
10.16
1,205.71
10,190.53
94.15
41.82
8,772.55
8,719.05
1,232.23
57.41
5,952,323.874
708,236.068
15.21
1,230.78
10,220.22
94.03
40.09
8,770.43
8,716.93
1,254.59
76.82
5,952,346.766
708,254.851
5.83
1,255.21
10,251.16
93.48
37.26
8,768.40
8,714.90
1,278.70
96.11
5,952,371.389
708,273.467
9.30
1,281.3/
10,280.84
94.03
33.61
8,766.46
8,712.96
1,302.82
113.28
5,952,395.980
708,289.960
12.41
1,307.26
10,310.46
92.24
31.33
8,764.84
8,711.34
1,327.77
129.15
5,952,421.358
708,305.139
9.78
1,333.85
10,34045
91.26
27.56
8,763.92
8,710.42
1,353.87
143.89
5,952,447.853
708,319.144
12.98
1,361.45
10,370.52
89.51
23.10
8,763.72
8,710.22
1,381.04
156.75
5,952,475.368
708,331.247
15.93
1,389.91
10,400.66
90.55
19.16
8,763.70
8,710.20
1,409.15
167.61
5,952,503.764
708,341.328
13.52
1,419.07
10,430.46
91.84
15.13
8,763.08
8,709.58
1,437.61
176.39
5,952,532.457
708,349.318
14.20
1,448.34
10,460.42
95.41
13.41
8,761.19
8,707.69
1,466.58
183.76
5,952,561.620
708,355.883
13.22
1,477.96
10,490.36
98.84
10.38
8,757.47
8,703.97
1,495.65
189.89
5,952,590.839
708,361.201
15.23
1,507.53
10,520.27
103.47
8.43
8,751.69
8,698.19
1,524.59
194.68
5,952,619.900
708,365.196
16.75
1,536.83
10,550.71
106.14
6.40
8,743.91
8,690.41
1,553.76
198.48
5,952,649.171
708,368.188
10.89
1,566.25
10,580.34
108.48
4.34
8,735.09
8,681.59
1,581.92
201.13
5,952,677.392
708,370.058
10.32
1,594.53
827/2019 12.03:46AM
Page 10
COMPASS 5000.1 Build 81D
by
TVDSS
NIS
Company: North America
- ALASKA - BP
Project: PBU
DLeg
V. Sec
Site: 11
(usft)
(usft)
Well: 11-37
(usft)
(usft)
Wellbore: 11-37A
(usft)
(°1100usft)
Design: 11-37A
_
8,724.82
Survey
1,612.84
202.13
MD
Inc Azi
708,370.200
(usft)
1°) (°)
10 612.94
108.22
359.36
10,640.80
107.48
358.39
10,670.27
108.06
355.51
10,700.37
107.09
358.88
10,733.50
105.04
3.61
• 10,775.00
- 105.04
3.61
Projection to TD
8,698.20
BP
Final Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 11-37
KB @ 53.50usft
KB @ 53.50usft
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
_
8,724.82
8,671.32
1,612.84
202.13
5,952,708.321
708,370.200
14.52
1,625.3E
8,716.28
8,662.78
1,639.35
201.61
5,952,734.808
708,368.945
4.25
1,651.64
8,707.29
8,653.79
1,667.37
200.12
5,952,762.775
708,366.679
9.51
1,679.31
8,698.20
8,644.70
1,696.03
198.72
5,952,791-380
708,364.485
11.15
1,707.62
8,689.03
8,635.53
1,727.84
199.42
5,952,823.202
708,364.303
15.05
1,739.31
• 8,678.26
8,624.76
1,767.84
201.94
5,952,863.253
708,365.719
0.00
1,779.34
8272019 12:03:46AM Page 11 COMPASS 5000.1 Build 81D
VVaAbas: 1BJ7A WELLBORE 01E13]A: 113]A �RP£KEKb jOWN,o.
SSfi: 71 coaabmlBElFeleema KB@i ,metmn
Ve4al(14D)Iblaenm SM (OM,O
Aced: 1147A u,ym�i�me T..MD 8%8,7PB1 nwsxeaUmMftebarm_ rc0 53. C.
CNml fon Abe W' Mi CuveYe
AOGCC - Offsets within 500ft
Eestine (400 usWn)
North America - ALASKA - BP
PBU
11
11-37
11-37A
11-37A
500292271601
AOGCC Offset Well Report
27 August, 2019
hp
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
11
Site Error:
0.00usft
Reference Well:
11-37
Well Error:
0.00usft
Reference Wellbore
11-37A
Reference Design:
11-37A
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-37
KB @ 53.50usft
KB @ 53.50usft
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCPi
Offset Datum
Reference
11-37A
=filter type:
NO GLOBAL FILTER: Using user defined selection 8
filtering criteria
nterpolation Method:
MD Interval 25.001
Error Model:
ISCWSA
)epth Range:
Unlimited
Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft
Error Surface:
Elliptical Conic
Survey Program
Date 8/27/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
146.00
8,565.701. MWD -Standard (11-37)
MWD
MWD -Standard
8,567.00
8,998.71 Survey#1 (11-37APBl)
MWD
MWD - Standard
9,020.00
10,775.00 Survey#1 (11-37A)
MWD
MWD -Standard
Summary
Bite Name
Offset Well - Wellbore - Design
11
11-16 - 11-16 - 11-16
11-16 - 11-16PB1 - 11-1Spell
11-17 - 11-17 - 11-17
11-17 - 11-17A- 11-17A
11-18 - 11-18 - 11-1 B
11-22 - 11-22 - 11-22
11-22 - 11-22A - 11-22A
11-22 - 11-22ALl - 11-22ALl
11-37 - 11-37 - 11-37
11-37 - 11-37APB1 - 11-37A WP04
11-37 - 11-37APB1 - 11-37APB1
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
1,094,94 1,100.00 184.82
1,09414 1,100.00 184.82
2,095.96 2,100.00 133.94
2,099.06 2,100.00 133.98
2,046.08 2,050.00 70.69
841.44 850.00 238.47
846.06 850.00 238.58
846.06 850.00 238.58
8,885.50 8,950.00 164.69
10,513.10 10,500.00 5.32
10, 346.24 10, 355.65 102.43
8127/2019 12.34:29AM Page 2 of 2 COMPASS 5000 1 Build BID
kL7*• •
:!A
North America - ALASKA - BP
PBU
11
11-37
11-37APB1
500292271670
Design: 11-37APB1
Final Survey Report
27 August, 2019
Me
Company:
Nodh America -ALASKA -BP
Project:
PBU
Site:
11
Well:
11-37
Wellbore:
11-37APB1
Design:
11-37APB1
BP
Final Survey Report
Local Coordinate Reference:
Well 11-37
TVD Reference:
KB @ 53.50usft
MD Reference:
KB @ 53.50usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK - Alaska PROD - ANCP7
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Use AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
11, TR -11-15
Site Position:
From:
Map
Position Uncertainty:
0.00 usft
Well
11-37, 11-37
Well Position
-N/-S 0.00 usft
-E/-W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
11-37APB1
Magnetics
Model Name Sample Date
r� =7019 1 ?2 o➢nM
BGGM2018 8/1/2019
Design
11-37APB1
Northing: 5,949,527.780 call
Easting: 707,585.650 usft
Slot Radius: 0.000 in
Northing: 5,951,090.590 usft
Easting: 708,212.770 usft
Wellhead Elevation: 29.31 usft
Declination Dip Angle Field Strength
(°) l°l (nT)
16.84 80.93 57,413
Latitude: 70° 15' 55.850 N
Longitude: 148° 19' 17.134 W
Grid Convergence: 1.58 '
Latitude: 70° 16' 11.045 N
Longitude: 148° 18'57,630 W
Ground Level: 27.31 usft
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth: 8,565.70
Vertical Section:
Depth From (TVD)
-NI-S
-E/-W Direction
(usft)
(usft)
(usft) (°)
24 19
0 00
0 00 7 07
r� =7019 1 ?2 o➢nM
Page 2 COMPASS 5000.1 Build 81D
r by
BP
Final Survey Report
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well 11-37
Project:
Pau
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37APB1
Survey Calculation Method:
Minimum Curvature
Design:
11-37APB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program
Date 8/27/2019
From
TO
(usft)
(usft)
Survey
(Wellbore)
Tool Name
Description
146.00
8,565.701:
MWD - Standard (11-37)
MWD
MWD -Standard
6,567.00
10,490.00
Survey#1
(11-37APB1)
MWD
MWD -Standard
Survey
MD
Inc
Azi
TVD
TVDSS
NIS EAN
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft) (usft)
(usft)
(usft)
(°I100usft)
24.19
0.00
0.00
24.19
-29.31
000
0.00
5,951,090.590
708,212.770
0.00
146.00
0.21
278.95
146.00
92.50
0.03
-0.22
5,951,090.619
708,212.549
0.17
240.00
0.17
66.76
240.00
186.50
0.12
-0.26
5,951,090.699
708,212.504
0.39
329.00
0.26
45.91
329.00
275.50
0.31
0.00
5,951,090.899
708,212.765
0.13
418.00
0.04
40.78
418.00
364.50
0.47
0.17
5,951,091.068
708,212.926
0.25
509.00
0.34
120.36
509.00
455.50
0.36
0.42
5,951,090.962
708,213.183
0.37
599.00
0.11
110.17
599.00
545.50
0.20
0.73
5,951,090.806
708,213.499
0.26
689.00
0.19
14.63
689.00
635.50
0.31
0.85
5,951,090.924
708,213.614
0.25
781.00
0.12
73.62
781.00
727.50
049
0.98
5,951,091.102
708,213.740
0.18
638.00
0.21
123.30
838.00
784.50
0.44
1.13
5,951,091.066
708,213.886
0.28
932.00
0.19
86.40
932.00
878.50
0.36
1.43
5,951,090.989
708,214.188
0.14
1,026.00
0.55
60.58
1,025.99
972.49
0.59
1.98
5,951,091.236
708,214.730
0.41
1,120.00
0.98
41.44
1,119.99
1,066.49
1.42
2.90
5,951,092.085
708,215.631
0.53
1,214.00
1.08
16.62
1,213.97
1,160.47
2.87
3.69
5,951,093.558
708,218.376
0.48
1,309.00
0.59
20.76
1,308.96
1,255.46
4.18
4.12
5,951,094.885
708,216.769
0.52
1,403.00
0.47
247.08
1,402.96
1,349.46
4.48
3.93
5,951,095.182
708,216.577
1.04
1,495.00
0.60
245.63
1,494.95
1,441.45
4.14
3.15
5,951,094.814
708,215.801
0.14
1,589.00
0.61
245.53
1,588.95
1,535.45
3.73
2.24
5,951,094.379
708,214.909
0.01
1,683.00
0.49
246.17
1,682.94
1,629.44
3.36
1.42
5,951,093.987
708,214.096
0.13
1,777.00
0.46
226.22
1,776.94
1,723.44
2.94
0.78
5,951,093.546
708,213.468
0.18
1,870.00
0.56
218.83
1,869.94
1,816.44
2.32
0.23
5,951,092.919
708,212.931
0.13
V. Sec
(usft)
0.00
0.01
0.08
0.31
0.49
0.41
0.28
0.41
0.60
0.58
0.53
0.83
1.76
3.30
4.66
4.93
4.49
3.98
3.51
3.01
2.33
827/2019 1:22:03AM Page 3 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North Amenca-ALASKA-BP
Local Coordinate Reference:
Well 11-37
project:
PBU
ND Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37APB1
Survey Calculation Method:
Minimum Curvature
Design:
11-37APB1
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DI -eq
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100ueft)
1,902.00
0.83
235.53
1,901.94
1,848.44
2.07
-0,06
5,951,092.658
708,212.649
1.05
1,932.00
1.44
251.54
1,931.93
1,878.43
1.83
-0.60
5,951,092.401
708,212.119
227
1,964.00
2.30
247.73
1,963.91
1,910.41
1.46
-1.58
5,951,092.003
708,211.154
271
1,995.00
3.09
248.05
1,994.88
1,941.38
0.91
-2.93
5,951,091.418
708,209.819
2.55
2,025.00
3.84
251.75
2,024.82
1,971.32
0.29
4.63
5,951,090.754
708,208.133
2.61
2,056.00
4.63
253.68
2,055.74
2,002.24
-0.38
-6.82
5,951,090.017
708,205.966
2.59
2,088.00
5.15
257.75
2,087.62
2,034.12
-1.05
-9.46
5,951,089.277
708,203.343
1.95
2,119.00
5.55
256.85
2,118.49
2,064.99
-1.69
-12.28
5,951,088.563
708,200.542
1.32
2,146.00
5.61
259.07
2,145.36
2,091.86
-2.24
-14.85
5,951,087.945
708,197.991
0.83
2,245.00
5.80
260.62
2,243.87
2,190.37
-3.97
-24.53
5,951,085.945
708,188.357
0.25
2,339.00
6.08
261.10
2,337.36
2,283.86
-5.51
-34.14
5,951,084.136
708,178.799
0.30
2,433.00
6.26
260.97
2,430.82
2,377.32
-7.09
44.12
5,951,082.286
708,168.868
0.19
2,527.00
6.22
261.29
2,524.28
2,470.76
-8.66
-54.21
5,951,060.432
708,158.821
0.06
2,620.00
6.19
262.96
2,616.72
2,563.22
-10.04
-64.17
5,951,078.779
708,148.907
0.20
2,712.00
5.94
264.61
2,708.20
2,654.70
-11.10
-73.83
5,951,077.457
708,139.278
0.33
2,805.00
5.66
265.21
2,800.73
2,747.23
-11.93
-83.19
5,951,076.364
708,129.945
0.31
2,899.00
5.19
263.39
2,894.30
2,840.60
-12.81
-92.03
5,951,075.243
708,121.130
0.53
2,991.00
5.23
263.61
2,985.92
2,932.42
-13.75
-100.33
5,951,074.068
708,112.859
0.05
3,085.00
4.79
261.79
3,079.57
3,026.07
-14.79
-108.48
5,951,072.806
708,104.749
0.50
3,116.00
4.23
267.14
3,110.47
3,056.97
-15.03
-110.90
5,951,072.497
708,102.334
2.26
3,148.00
3.61
273.18
3,142.39
3,088.89
-15.03
-113.08
5,951,072.434
708,100.151
2.33
3,177.00
3.09
277.38
3,171.34
3,117.84
-14.88
-114.77
5,951,072.538
708,098.461
1.98
3,206.00
2.16
285.00
3,200.31
3,146.81
-14.64
-116.07
5,951,072.744
708,097.151
3.42
3,240.00
1.22
302.78
3,234.30
3,180.80
-14.28
-117.00
5,951,073.080
708,096.218
3.13
3,271.00
0.69
327.02
3,265.30
3,211.80
-13.94
-117.38
5,951,073.405
708,095.830
2.11
3,300.00
0 60
354.84
3,294.29
3,240.79
-13.65
-117.49
5,951,073.699
708,095.713
1.11
3,331.00
0.80
353.84
3,325.29
3,271.79
-13.27
-117.52
5,951,074.075
708,095.665
0.65
V. Sec
(usft)
2.0
1.74
1.25
0.54
-0.28
-1.22 i
-2.21
-3.19
4.05
-6.96
-9.67
-12.46
-15.27
-17.86
-20.10
-22.0'
-24.04
-26.00
-28.03
-28.57
-28.84
-28.90
-28.82
-28.57
-28.29
-28.00
-27.63
827/2019 1: 22:03AM Page 4 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 11-37
Project:
PBU
ND Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37APB1
Survey Calcutation Method:
Minimum Curvature
Design:
11-37APB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi
TVD
NDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(1)
V)
(usft)
(usft)
(usft)
(usft)
1 -ft)
(Usft)
(°1100usft)
(usft)
3,424.00
0.69
203.17
3418.29
3,364.79
-13.14
-117.81
5,951,074.198
708,095.372
1.55
-27.5,
3,518.00
1.02
197.24
3,512.28
3,458.78
-14.46
-118.28
5,951,072.866
708,094.938
0.36
-28.91
3,612.00
0.94
204.98
3,606.26
3,552.76
-15.96
-118.86
5,951,071.352
708,094.406
0.16
-3D46
3,705.00
0.94
209.71
3,699.25
3,645.75
-17.31
-119.56
5,951,069.980
708,093.743
0.08
-31.89
3,765.00
0.93
197.59
3,759.24
3,705.74
-18.20
-119.95
5,951,069.078
708,093.377
0.33
-32.83
3,858.73
0.94
202.91
3,852.96
3,799.46
-19.64
-120.48
5,951,067.630
708,092.888
0.09
-34.31
3,951.07
0.82
204.28
3,945.29
3,891.79
-20.94
-121.04
5,951,066.315
708,092.357
0.13
-35.67
4,045.98
0.71
203.11
4,040.19
3,986.69
-22.10
-121.55
5,951,065.142
708,091.880
0.12
-36.89
4,140.25
0.83
331.90
4,134.46
4,080.96
-22.03
-122.11
5,951,065.192
708,091.327
1.47
-36.89
4,234.50
0.84
326.26
4,226.70
4,175.20
-20.85
-122.81
5,951,066.348
708,090.590
0.09
-35.81
4,326.53
0.87
329.21
4,320.72
4,267.22
-19.69
-123.54
5,951,067.489
708,089.826
0.06
-34.75
4,416.88
0.71
338.24
4,413.06
4,359.56
-18.56
-124.11
5,951,068.606
708,089.224
0.22
-33.69
4,511.16
0.69
330.73
4,505.33
4,451.83
-17.54
-124.60
5,951,069.608
708,088.712
0.10
-32.75
4,601.96
0.76
338.20
4,596.12
4,542.62
-16.51
-125.09
5,951,070.630
708,088.193
0.13
-31.78
4,692.72
0.64
338.70
4,686.88
4,633.38
-15.48
-125.50
5,951,071.649
708,087.757
0.13
-30.80
4,786.64
0.49
323.08
4,780.79
4,727.29
-14.67
-125.93
5,951,072.447
708,087.303
0.23
-30.0'
4,879.96
0.56
326.36
4,874.11
4,820.61
-13.97
-126.42
5,951,073.132
708,086.791
0.08
-29.42
4,971.48
0.72
333.96
4,965.62
4,912.12
-13.08
-126.92
5,951,074.006
708,086.267
0.20
-28.60.
5,063.09
0.51
315.39
5,057.23
5,003.73
-12.27
-127.46
5,951,074.798
708,085.705
0.31
-27.87
5,153.37
0.30
329.36
5,147.51
5,094.01
-11.78
-127.86
5,951,075.277
708,085.289
0.26
-27.43
5,246.91
0.34
322.78
5,241.04
5,187.54
-11.35
-128.15
5,951,075.700
708,084.985
0.06
-27.04
5,341.82
0.45
325.50
5,335.95
5,282.45
-10.82
-128.54
5,951,076.221
708,084.589
0.12
-26.56
5,434.08
0.38
315.51
5,428.21
5,374.71
-10.30
-128.96
5,951,076.726
708,084.155
0.11
-26.10
5,528.44
0.33
308.50
5,522.57
5,469.07
-9.91
-129.39
5,951,077.106
708,083.713
0.07
-25.76
5,625.30
0.63
320.53
5,619.42
5,565.92
-9.32
-129.94
5,951,077.675
708,083.140
0.33
-25.25
5,721.79
0.51
318.40
5,715.91
5,662.41
-8.59
-130.57
5,951,078.388
708,082.498
0.13
-24.60
5,818.46
0.83
323.36
5,812.57
5,759.07
-7.71
-131.27
5,951,079.252
708,081.770
0.34
-23.81
8/27/2019 1:22.03AM Page 5 COMPASS 5000.1 Build BID
r. a
BID
Final Survey Report
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well 11-37
Project: PBU
TVD Reference:
KB @ 53.50usft
Site: 11
MD Reference:
KB @ 53.50usft
Well: 11-37
North Reference:
True
Wellbore: 11-37APB1
Survey Calculation Method
Minimum Curvature
Design: 11-37APB1
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
Azl
TVD
NDSS
NIS
EIW
Northing
Easting
DI -eq
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
5,91382
0.81
78.56
5,907.93
5,854.43
-7.02
-131.02
5951 079
946
708,081999
1.45
-23.1(
6,010.56
0.72
61.46
6,004.66
5,951.16
-6,60
-129.82
5,951,080.405
708,083.191
0.25
-22.52
6,106.81
0.67
48.38
6,100.90
6,047.40
-5.93
-128.87
5,951,081.094
708,084.124
0.17
-21.75
6,202.11
1.11
75.38
6,196.19
6,142.69
-5.33
-127.56
5,951,081.733
708,085.417
0.63
-20.99
6,297.56
1.13
72.44
6,291.62
6,238.12
4.81
-125.76
5,951,082.300
708,087.194
0.06
-20.26
6,393.36
0.98
56.79
6,387.41
6,333.91
-4.08
-124.18
5,951,083.077
708,088.759
0.34
-19.33
6,488.94
1.23
114.70
6,482.97
6,429.47
-4.06
-122.56
5,951,083.141
708,090.374
1.14
-19.11
6,521.18
1.25
119.30
6,515.20
6,461.70
-4.38
-121.94
5,951,082.841
708,091.003
0.31
-19.35'i
6,553.24
1.18
119.25
6,547.26
6,493.76
-4.71
-121.35
5,951,082.526
708,091.605
0.22
-19.61
6,585.66
1.10
126.33
6,579.67
6,526.17
-5.06
-120.81
5,951,082.193
708,092.156
0.50
-19.891
6,617.79
0.69
124.51
6,611.80
6,558.30
-5.35
-120.40
5,951,081.912
708,092.572
1.28
-20.131
6,649.08
0.24
159.40
6,643.09
6,589.59
-5.52
-120.22
5,951,081.749
708,092.755
1.64
-20.27
6,681.42
1.49
257.13
6,675A2
6,621.92
-5.67
-120.61
5,951,081.582
708,092.373
4.76
-20.48
6,713.55
3.12
266.21
6,70752
6,654.02
-5.83
-121.89
5,951,081.395
708,091.098
5.18
-20.78
6,744.76
4.11
274.15
6,739.87
6,685.17
-5.80
-123.85
5,951,081.366
708,089.135
3.55
-21.00
6,776.99
5.16
273.03
6,770.80
6,717.30
-5.64
-126.45
5,951,081.454
708,086.533
3.27
-21.1f
-
6,810.45
6.48
270.02
6,804.08
6,750.58
-5.56
-129.84
5,951,081.440
708,083.141
4.05
-21.50
6,841.16
7.44
269.16
6,834.57
6,781.07
-5.59
-133.56
5,951,081.309
708,079.423
3.14
-21.99
6,873.37
7.92
266.25
6,866.49
6,812.99
-5.76
-137.86
5,951,081.014
708,075.130
1.92
-22.69
6,904.51
8.38
265.86
6,897.31
6,843.81
-6.07
-142.26
5,951,080.589
708,070.736
1.49
-23.531
6,936.70
9.08
263.65
6,929.13
6,875.63
-6.52
-147.13
5,951,080.004
708,065.887
2.41
-24.58
6,969.68
10.15
264.24
6,961.65
6,908.15
-7.10
-152.61
5,951,079.273
708,060.427
3.26
-25.831
7,000.82
11.68
260.69
6,992.22
6,938.72
-7.88
-158.45
5,951,078.327
708,054.610
5.36
-27.33
7,032.96
13.08
256.89
7,023.61
8,970.11
-9.24
-165.20
5,951,076.789
708,047.898
5.04
-29.50
7,065.11
12.52
259.08
7,054.97
7,001.47
-10.72
-172.16
5,951,075.112
708,040.977
2.30
-31.83
7,096.01
14.67
254.76
7,085.00
7,031.50
-12.38
-179.23
5,951,073.254
708,033.881
7.69
-34.35
7,127.49
15.49
254.22
7,115.39
7,061.89
-14.57
-187.12
5,951,070.845
708,026.134
2.64
-37.50
8/272019 1:22:03AM
Page 6
COMPASS
5000.1 Build
81D
BP
Final Survey Report
Company:
North Amenca- ALASKA - BP
Local Cc -ordinate Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37APB1
Survey Calculation Method:
Minimum Curvature
Design:
11-37APB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
An
TVD
NDSS
NIS
E/W
Northing
Easting
Dl -eq
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
7,157.70
16.26
253.35
7,144.45
7,090.95
-1688
-195.05
5,951,068.316
708,018.267
2.67
-40.71
7,190.03
17.23
251.11
7,175.41
7,121.91
-19.73
-203.92
5,951,065.227
708,009.483
3.60
-44.68
7,222.24
18.32
250.90
7,206.08
7,152.58
-22.93
-213.22
5,951,061.770
708,000.278
3.39
49.00
7,254.35
19.15
250.44
7,236.49
7,182.99
-26.35
-222.95
5,951,058.088
707,990.645
2.63
-53.59
7,285.79
19.35
250.90
7,266.17
7,212.67
-29.78
-232.73
5,951,054.388
707,980.963
0.80
-58.20
7,318.20
19.75
254.85
7,296.72
7,243.22
-32.97
-243.09
5,951,050.914
707,970.696
4.26
-62.63
7,350.30
19.81
259.87
7,326.93
7,273.43
-35.34
-253.68
5,951,048.248
707,960.176
5.29
-66.29
7,382.10
20.50
262.65
7,356.78
7,303.28
-37.00
-264.51
5,951,046.289
707,949.399
3.71
-69.27
7,413.27
20.64
263.19
7,385.96
7,332.46
-38.35
-275.38
5,951,044.639
707,938.573
0.76
-71.95
7,445.60
20.17
264.45
7,416.26
7,362.76
-39.56
-286.58
5,951,043.115
707,927.406
1.99
-74.54
7,477.17
20.71
263.53
7,445.84
7,392.34
40.72
-297.55
5,951,041.657
707,916.478
1.99
-77.03
7,509.39
21.06
288.22
7,475.95
7,422.45
41.74
-308.985,951,040.317
707,905.074
3.17
-79.46
7,542.17
20.86
265.14
7,506.58
7,453.06
42.63
-320.68
5,951,039.112
707,893.411
1.33
-81.771
7,574.13
20.52
265.22
7,536.46
7,482.86
43.58
-331.93
5,951,037.852
707,882.191
1.07
-84.10
7,606.37
20.96
264.57
7,588.61
7,513.11
44.59
-343.30
5,951,036.521
707,870.852
1.54
-86.51
7,638.55
21.06
266.10
7,596.65
7,543.15
45.53
-354.80
5,951,035.266
707,859.385
1.73
-88.8!
7,671.79
21.02
265.80
7,627.67
7,574.17
-46.37
-366.70
5,951,034.094
707,847.509
0.35
-91.15
7,705.50
21.68
264.84
7,659.07
7,605.57
-47.38
-378.93
5,951,032.753
707,835.311
2.22
-93.65
7,737.18
23.35
264.26
7,688.33
7,634.83
-48.53
-391.01
5,951,031.265
707,823.273
5.32
-96.29
7,768.30
23.48
265.32
7,716.89
7,663.39
-49.65
403.32
5,951,029.803
707,810.994
1.42
-98.92
7,800.06
23.32
264.49
7,746.04
7,692.54
-50.77
415.89
5,951,028.336
707,7911.467
1.15
-101.57
7,894.02
20.67
266.50
7,833.15
7,779.65
-53.57
450.96
5,951,024.568
707,763.489
2.93
-108.67
7,920.22
19.80
265.98
7,863.37
7,809.87
-54.30
462.07
5,951,023.532
707,752.401
2.76
-110.761
8,021.69
20.10
262.92
7,953.11
7,899.61
-57.46
494.48
5,951,019.481
707,720.092
1.14
-117.88
8,117.73
21.27
265.35
8,042.96
7,989.46
-60.90
-528.22
5,951,015.103
707,686.461
1.51
-125.45
8,214.45
22.00
267.52
8,132.87
8,079.37
-63.11
-563.81
5,951,011.913
707,650.952
1.12
-132.02
8,308.88
20.07
267.12
8,221.00
8,167.50
-64.69
-597.66
5,951,009.398
707,617.154
2.05
-137.76
8272019 1r22:03AM
Page 7
COMPASS 5000.1 Build
81D
BP
bp
Final
Survey Report
Company: North America
- ALASKA - BP
Local Co-ordinate
Reference:
Well 11-37
Project: PBU
TVD Reference:
KB @ 53.50ush
Site: 11
MD Reference:
KB @ 53.50ush
Well: 11-37
North Reference:
True
Wellbore: 11-37APB1
Survey Calculation Method:
Minimum Curvature
Design: 11-37APB1
Database:
EDM R5K - Alaska
PROD - ANCPi
Survey
MD Inc
AN
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V.Sec
lush) (°)
(°)
(usR)
(usR)
(usR)
(usR)
(usR)
(usR)
(°/100usR )
(usR)
8,340.23
1942.
267.41
8,250.51
8,197.01
-65.19
-608.24
5,951,008.600
707,606.594
2.10
-139.5E
8,372.84
17.78
271.76
8,281.41
8,227.91
-65.29
-618.64
5,951,008.220
707,596207
6.58
-140.93
8,404.77
15.44
285.96
8,312.02
8,258.52
-63.97
-627.60
5,951,009.291
707,587.210
14.62
-140.73
8,436.68
14.30
303.65
8,342.88
8,289.38
-60.61
-634.97
5,951,012.439
707,579.752
14.61
-138.31
8,468.88
13.19
315.92
8,374.16
8,320.66
-55.77
-640.84
5,951,017.118
707,573.753
9.67
-134.221
8,501.16
14.19
326.93
8,405.53
8,352.03
49.81
-645.56
5,951,022.947
707,568.869
8.63
-128.881
8,533.36
15.36
338.62
8,436.67
8,383.17
42.53
-649.27
5,951,030.122
707,564.960
9.93
-122.12
8,565.70
16.11
353.26
8,467.81
8,414.31
-34.08
-651.36
5,951,038.508
707,562.638
12.46
-113.99
Tie -in -point
8,567.00
16.19
353.77
8,469.06
8,415.56
-33.72
-651.40
5,951,038.866
707,562.587
12.53
-113.64
KOP - Top of Whipstock
8,595.22
19.09
351.00
8,495.95
8,442.45
-25.25
-652.55
5,951,047.302
707,561.204
10.70
-105.37
Interpolated Azimuth
8,625.30
27.00
350.00
8,523.61
8,470.11
- -15.65
-654.51
5,951,058.844
707,558.926
28.33
-94.10
Interpolated Azimuth
8,655.77
35.90
349.00
8,549.58
8,496.08
1.97
-657.42
5,951,074.369
707,555.584
29.26
-78.971
Interpolated Azimuth
8,685.40
45.15
349.00
8,572.08
8,518.58
20.84
-661.09
5,951,093.138
707,551.394
31.22
-60.68
Interpolated Azimuth
8,715.69
55.17
348.86
8,591.58
8,538.08
43.79
-665.58
5,951,115.949
707,546.269
32.87
-38.46
First Clean Survey
8,745.64
65.80
353.64
8,606.23
8,552.73
69.34
-669.45
5,951,141.380
707,541.689
38.35
-13.59
8,767.81
73.45
357.48
8,613.94
8,560.44
90.04
-671.04
5,951,162.029
707,539.527
38.13
6.76
8,795.38
78.03
6.57
8,620.74
8,567.24
116.70
-670.08
5,951,188.708
707,539.754
36.00
33.34
8,822.37
77.43
9.70
8,626.48
8,572.98
142.81
-666.35
5,951,214.905
707,542.761
11.55
59.71
8,848.04
77.15
11.86
8,632.13
8,578.63
167.41
-661.66
5,951,239.621
707,546.761
8.28
84.70
8,880.52
76.74
13.77
8,639.47
8,585.97
198.26
-654.65
5,951,270.653
707,552.922
5.87
116.18
8,910.96
76.83
15.88
8,646.43
8,592.93
226.90
-647.07
5,951,299.496
707,559.708
6.75
145.54
627/2019 122..03AM
Page 8
COMPASS
5000.1 Build BID
go
BP
Final Survey Report
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well 11-37
Project:
PBU
TVD Reference:
KB @ 53.50usft
Site:
11
MD Reference:
KB @ 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
11-37APB1
Survey Calculation Method:
Minimum Curvature
Design: 11-37APB1 Database: EDM R5K - Alaska PROD - ANCPt
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
8,940.84
7670
18.56
8,653.27
8,599.77
254.68
-638.46
5,951,327.502
707,567.546
8.74
174 It
8,970.82
77.40
21.05
8,659.99
8,606.49
282.17
-628.56
5,951,355.250
707,576.680
8.42
202.66
8,998.71
78.31
23.50
8,665.86
8,612.36
307.40
-618.22
5,951,380.753
707,586.313
9.19
228.97
9,028.46
78.19
25.88
8,671.92
8,618.42
333.86
-606.06
5,951,407.540
707,597.741
7.84
256.731
9,062.31
79.01
28.50
8,678.61
8,625.11
363.37
-590.89
5,951,437.459
707,612.080
7.96
287.88
9,090.44
78.44
30.77
8,684.11
8,630.61
387.35
-577.25
5,951,461.803
707,625.051
8.17
313.35
9,120.49
76.86
32.57
8,690.54
8,637.04
412.33
-561.85
5,951,487.200
707,639.762
7.87
340.04
9,152.33
75.38
36.09
8,698.18
8,644.68
437.85
-544.42
5,951,513.194
707,656.475
11.70
367.52
9,180.69
74.42
38.82
8,705.57
8,652.07
459.59
-527.77
5,951,535.379
707,672.515
9.89
391.13
9,215.93
72.00
43.47
6,715.75
8,662.25
484.99
-505.59
5,951,561.383
707,693.985
14.38
419.07
9,244.93
70.22
46.20
8,725.14
8,671.64
504.45
-486.25
5,951,581.367
707,712.779
10.82
440.76
9,274.79
70.69
50.34
8,735.13
8,681.63
523.17
-465.25
5,951,600.663
707,733.247
13.16
461.93
9,305.34
70.89
53.26
8,745.19
8,691.89
541.01
-442.55
5,951,619.120
707,755.413
9.05
48242
9,335.16
70.83
56.47
8754.97
8,701.47
557.22
-419.55
5,951,635.961
707,777.989
10.17
501.34
9,365.38
69.99
58.32
8,765.10
8,711.60
572.56
-395.57
5,951,651:959
707,801.536
6.40
519.52
9,395.65
72.13
57.61
8,774.92
8,721.42
587.75
-371.30
5,951,667,811
707,825.375
7.41
537.5E
9,426.06
75.34
55.91
8,783.44
8,729.94
603.75
-346.89
5,951,684.481
707,849.332
11.84
556.46
9,455.64
78.91
53.26
8,790.03
8,736.53
620.46
-323.40
5,951,701.834
707,872.351
14.90
575.94
9,485.55
82.57
51.28
8,794.84
8,741.34
638.52
-300.05
5,951,720.535
707,895.182
13.87
596.74
9,515.60
85.02
50.47
8,798.09
8,744.59
657.37
-276.88
5,951,740.017
707,917.824
8.58
618.29
9,545.45
87.24
47.84
8,800.11
8,746.61
676.85
-254.36
5,951,760.107
707,939.801
11.51
640.39
9,575.13
92.85
47.72
8,800.08
8,746.58
696.78
-232.38
5,951,780.643
707,961.211
18.91
662.88
9,605.40
96.86
43.99
8,797.52
8,744.02
717.78
-210.75
5,951,802.229
707,982.258
18.06
686.38
9,635.44
100.57
43.12
8,792.97
8,739.47
739.29
-190.29
5,951,824.300
708,002.111
12.68
710.25
9,665.20
101.52
41.74
8,787.27
8,733.77
760.85
-170.58
5,951,846.393
708,021.213
5.56
734.07
9,695.29
101.50
39.77
8,781.26
8,727.76
783.19
-151.34
5,951,869.250
708,039.834
6.42
756.60
9,725.21
99.35
39.96
8,775.85
8,722.35
805.77
-132.48
5,951,892.347
708,058.062
7.21
783.34
&27/2019 1:22:03AM Page 9 COMPASS 5000.1 Build 81D
BP
Final Survey Report
company: North America - ALASKA - BP
Local Co-ordinate Reference:
We1111-37
Project: PBU
TVD Reference:
KB @ 53.50usft
Site. 11
MD Reference:
KB @ 53.50usft
Well: 11-37
North Reference:
True
Wellbore: 11-37APB1
Survey Calculation Method:
Minimum Curvature
Design: 11-37APB1
Database:
EDM R5K-Alaska
PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
PJW
Northing
Easting
DLeg
V. Sec
(usft) (')
V),
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('/t00usft)
(usft)
9,755.14
96.08
38.50
8,771.83
8,718.33
828.74
-113.72
5,951,915.827
708,076.171
11.95
808.41
9,789.68
92.02
39.02
8,769.39
8,715.89
855.60
-92.16
5,951,943.272
708,096.985
11.85
837.75
9,815.37
90.98
WAS
8,768.72
8,715.22
875.91
-76.44
5,951,964.005
708,112.134
10.75
859.84
9,845.19
90.71
35.31
8,768.28
8,714.78
900.07
-58.96
5,951,988.635
708,128.935
3.96
885.96
9,875.26
90.37
32.66
8,768.00
8,714.50
925.00
-42.16
5,952,014.019
708,145.044
8.88
912.77
9,904.27
92.09
31.19
8,767.38
8,713.88
949.61
-26.82
5,852,039.047
708,159.683
7.80
939.09
9,935.08
90.92
30.05
8,766.57
8,713.07
976.11
-11.13
5,952,065.974
708,174.640
5.30
967.32
9,965.50
91.44
31.46
8,765.94
8,712.44
1,002.25
4.42
5,952,092.528
708,189.462
4.94
995.17
9,995.53
89.85
33.12
8,765.60
8,712.10
1,027.63
20.46
5,952,118.343
708,204.793
7.65
1,022.34
10,026.21
92.67
36.98
8,764.93
8,711.43
1,052.74
38.07
5,952,143.923
708,221.700
15.58
1,049.42
10,055.40
91.26
38.26
8,763.93
8,710.43
1,075.84
55.87
5,952,167.511
708,238.861
6.52
1,074.54
10,085.35
89.79
38.92
8,763.65
8,710.15
1,099.25
74.55
5,952,191.426
708,256.885
5.38
1,100.07
10,115.29
88.03
41.30
8,764.22
8,710.72
1,122.14
93.84
5,952,214.341
708,275.526
9.89
1,125.16
10,150.61
85.11
42.09
8,766.33
8,712.83
1,148.47
117.29
5,952,241,802
708,298.237
8.56
1,154.17
10,175.43
84.15
40.26
8,768.65
8,715.16
1,167.06
133.55
5,952,260.842
708,313.983
8.30
1,174.63
10,210.33
86.62
40.69
8,77146
8,717.96
1,193.52
156.13
5,952,287.915
708,335.821
7.18
1,203.67
10,235.40
88.96
38.92
8,772.43
8,718.93
1,212.77
172.17
5,952,307.594
708,351.317
11.70
1,224.74
10,265.21
91.97
36.41
8,772.19
8,718.69
1,236.36
190.38
5,952,331.679
708,366.867
13.15
1,250.39
10,295.51
92.70
33.45
8,770.95
8,717.45
1,261.18
207.71
5,952,356.966
708,385.506
10.05
1,277.15
10,325.33
89.63
29.37
8,770.35
8,716.85
1,286.61
223.25
5,952,382.821
708,400.328
17.12
1,304.31
10,355.65
89.72
28.33
8,770.52
8,717.02
1,313.17
237.87
5,952,409.771
708,414.216
3.44
1,332.46
10,392.32
90.68
23.23
8,770.39
8,716.89
1,346.18
253.82
5,952,443.206
708,429.239
14.15
1,367.18
10,420.32
89.88
19.62
8,770.26
8,716.76
1,372.24
264.04
5,952,469.538
708,438.740
13.21
1,394.30
10,450.16
92.15
18.47
8,769.73
8,716.23
1,400.44
273.78
5,952,497.995
708,447.691
8.53
1,42349
10,490.00
92.15
18.47
8,768.23
8,714.73
1,438.20
286.39
5,952,536.089
708,459.253
0.00
1,462.51
Projection to TD
8/27/2019 1.22:03AM Page 10 COMPASS 5000.1 Build 81D
am
AOGCC - Offsets within 500ft
EasYn0 (300 usWin)
�� � WELLBDRE DETt-3]APB13]APB1
Sb: 1�
T/�1 Coad 0+Ela w�d�i l�nwlnn
WM: 1147
mvp�snu. ewa(nro)aenanw. rca@v1.50 L
7
WNGac 11-VAPB1
m D%affl 9aWilvSlaDvenm W IMAM)
L..'N'�•bn�uenm.
AMiW: N41APB1
l�/ wy em�mi TlG an MD: 8595]0 �
M.C.M.mM
AOGCC - Offsets within 500ft
EasYn0 (300 usWin)
North America - ALASKA - BP
PBU
11
11-37
11-37APB1
11-37APB1
500292271670
AOGCC Offset Well Report
27 August, 2019
an
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
11
Site Error:
0.00usft
Reference Well:
11-37
Well Error:
0.00usft
Reference Wellbore
11-37APB1
Reference Design:
11-37APB1
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-37
KB @ 53.50usft
KB @ 53.50usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
11-37AP81
Offset
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Measured
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program
Date 8/27/2019
Offset
From
To
Measured
(usft)
(usft) Survey (Wellbore)
Tool Name Description
146.00
8,565.70 1L MWD- Standard (11-37)
MWD MWD - Stantlard
8,587.00
10,490.00 Survey#1(11-37APB7)
MWD MWD - Stantlard
Summary
11
11-16 - 11-18 - 11-18
11-16 - 11-16PB1 - 11-16PB1
11-17 - 11-17 - 11-17
11-17 - 11-17A- 11-17A
11-18 - 11-18 - 11-18
11-22 - 11-22 - 11-22
11-22 - 11-22A - 11-22A
11-22 - 11-22ALl - 11-22ALl
11-37 - 11-37 - 11-37
11-37 - 11-37A - 11-37A
1.094.94 1,100.00 184.82
1,094.94 1,100.00 184.82
2,095.96 2,100.00 133.94
2,099.06 2,100.00 133.98
2,048.08 2,050.00 70.69
841.44 850.00 238.47
846.06 850.00 238.58
848.06 850.00 238.58
8,885.50 8,950.00 184.69
10,474.31 10,450.00 105.69
8/272019 127.50AM Page 2 of 2 COMPASS 5000 1 Build 81D
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
04
11
11-16 - 11-18 - 11-18
11-16 - 11-16PB1 - 11-16PB1
11-17 - 11-17 - 11-17
11-17 - 11-17A- 11-17A
11-18 - 11-18 - 11-18
11-22 - 11-22 - 11-22
11-22 - 11-22A - 11-22A
11-22 - 11-22ALl - 11-22ALl
11-37 - 11-37 - 11-37
11-37 - 11-37A - 11-37A
1.094.94 1,100.00 184.82
1,094.94 1,100.00 184.82
2,095.96 2,100.00 133.94
2,099.06 2,100.00 133.98
2,048.08 2,050.00 70.69
841.44 850.00 238.47
846.06 850.00 238.58
848.06 850.00 238.58
8,885.50 8,950.00 184.69
10,474.31 10,450.00 105.69
8/272019 127.50AM Page 2 of 2 COMPASS 5000 1 Build 81D
Ynnlea 9/192019 4:46:04PM
North America - ALASKA - BP
Page 1 or 2
Cementing Report
Common Well Name. 11-37 / 02
"- '
-
Repono.: iProleclPBU-- ----
i Report date. 8/2 /2
019Si[e
- — - -
Event Type: COM -ONSHORE (CON)
--- -—
11
Start Date 8/25/2019
SpudDate/Tme1171996
-
Contractor NABORS ALASKA DRILLING INC.
— _
End Date,
: -2 1 Rig Release
Rig Name/No.CDR — -
AFE N0 :
H-S4DW0019G5-EX-DI-RN- (1,229,063.00)
BPUOI:
8PIFUSA00001243
Ac9ve datum: KB Q53.50usfl (above Mean Sea Leveg -
- - - - -- - - _
General Information
Job type: Primary
Cement job start date/time: 8/26/2019 9:OOPM
Job end date/time: 8/27/2019 12:OOAM
Cement Company: SCHLUMBERGER
Cemented String: PRODUCTION LINER 1
String Size:
Cementer: SHANE LOFGREN
2.875 (in)
String Set TMD: 10,773.00 (usfl) Hole Size: 4.125 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Rotating Time (Start -End):
RPM:
Rotating Torque (init/avg/max): (ft-lbf)
Reciprocating Time (Start -End):
Recip Drag Up/Dom: - (kip)
SPM: Stroke Length:
FW Nuea: CEMENT
Fillets (1 of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
TAIL SLURRY Density: 15.30(ppg)
Yield. 1.3100 (fN/sk)
Mix Water Ratio:
4.290 (gapsk94) Excess:
20.00(%) Mix Method: BATCH
Sacks Used. 226.70 (94Ib sacks) Water Volume:
23.2 (bbl) Excess Slurry Volume:
8.8 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
52.9 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
PV:
YP:
Gels 10 Sec:
Gels 10 Min:
Viscosity:
Additives
Name
Type
Amount Units
Concentration Unit
D163
CEMENT
D047
ANTIFOAM AGENT
5.000
%BWOC
D208
0.100
GAUSX
ANTIFOAM AGENT
D065
0.100
GAUSX
D600
DISPERSANT
GAS -BLOCK
1.400
%BWOC
D187
FLUID LOSS
1.500
GAUSX
0.100
%BWOC
PIuld Trite
Thick 8me
(hr)
Thick
temp.
Free grater
Free water
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp
Comp Strength
Comp Strength
('F)
(%)
temp.
(cU30min)
temp.
press.
Strength
Strength
Strength
Strength Time
Pressure2
Temperature 2
(°F)
('F)
(psi)
Time 1
Pressure 1
Temperature 1
2
(psi)
('F)
5.32
180.001
0.00
80.00
—38.01
180.00
min
psi
(^F)
min
Ynnlea 9/192019 4:46:04PM
North America - ALASKA - Bp
Cementing Report
Common Well Name: 11-37 / 02 --- —'— - —
Project:PBU_-Site: 11
Event Type: COM (CON)
ON) - - - _ - -- -- --- — _
Start Date'. 8/25/2019 End Date
Corrector. NABOBS ALASKA DRILLING INC R
_ _
BPUOI: USA00001243
_
-
_ - _
ig Name/No.. CDR -2 Rig Release:
Casing Tat
Active datum: KB @53.50usft (above Mean Sea Level)
Test Pressure:
(psi)
FIT/LOT:
Stages
Liner Overlap:
Stange Stage Type
Time:
Est. Top EstBottom
ud.
MCircTo
. Mud Circ. pBottom
N
Positive Test:
(usft)
(usft)
Plug Pressure
Rate Press, Plug Plug
Floet Pressure
gomped gumPetl Held Hem
(gPm) (psi)
1 PRIMARYCEMENT7,532.00
Negative Test:
(ppg)
10,773.00
Hours Before Start:
(hr)
Time before test:
(hr)
y Y v
v
Found on Tool:
N
Pumping Schedule
Log/Survay Evaluation
Fluid pumped
Volume
Avg.Max
Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start
pumping entl
Under Pressure:
Pumped
Disp.
Rate
TMD
ISlurry
TMD
Bond Quality:
Pmp
date/time
(bbl)
Rate
(bbl/min)
(usft)
(usft)
TOC Sufficient
N
Printed 9/19/2019 4:48:04PM
mepon no.: 1 ___[ Report date: 8/27/2019
Spud Datemme:11/7%1998 -- — -
AFE No.: - -- _— -
H-S4DW0019G5-EA-Dt-RN- (1,229,093.00) — —
Returns
Page 2 of 2
Prior Surface Mud Lost Flow
(hr) (bbl) (bbl) Atter
Start DispI Foam I Gas Type I Gas Vol I BH circ. I Bh static
lob Used temp, temp.
Positive Test ToolN
Negative Test Tool. N
Tea%
Casing Tat
Shoo Teat
Test Pressure:
(psi)
FIT/LOT:
(ppg)
Liner Overlap:
(usft)
Time:
(min)
Tool:
N
Positive Test:
(Ppg)
Cement Found between Shoe and Collar: N
OPen Hole Length:
(usft)
Negative Test:
(ppg)
Hours Before Start:
(hr)
Time before test:
(hr)
Found on Tool:
N
Log/Survay Evaluation
CBL Run:
N
interpretation
Interpretation Summary
Under Pressure:
(psi)
Cement Top:
(usft)
Bond Quality:
Haw Determined:
CET Run:
N
TOC Sufficient
N
Bond Quality:
Job Rating:
Temp Survey:
N
If Unsuccessful, Detection Indicator:
Him Prior to Log:
(hr)
Remedial Cement Required:
N
How Determined:
Printed 9/19/2019 4:48:04PM
mepon no.: 1 ___[ Report date: 8/27/2019
Spud Datemme:11/7%1998 -- — -
AFE No.: - -- _— -
H-S4DW0019G5-EA-Dt-RN- (1,229,093.00) — —
Returns
Page 2 of 2
Prior Surface Mud Lost Flow
(hr) (bbl) (bbl) Atter
Start DispI Foam I Gas Type I Gas Vol I BH circ. I Bh static
lob Used temp, temp.
Positive Test ToolN
Negative Test Tool. N
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Sean Mclaughlin
Engineering Team Lead
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.009cc.olaska.gov
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 11-37A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 219-062
Surface Location: 4628' FSL, 4639' FEL, SEC. 34, TI IN, R15E, UM
Bottomhole Location: 1208' FSL, 876' FWL, SEC. 27, TI IN, R15E, UM
Dear Mr. Mclaughlin:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
r
DATED this day of April, 2019.
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMIS9
PERMIT TO DRILL
20 AAC 25.005
HEUE11/ED
APR 17 ?qtq
Ia. Type of Work:1b.
Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑
1c. Specify t�I all is proposed for.
Drill ❑ Lateral ❑
Stretigraphic Test 11 Development -Oil 0 Service -Winj ❑ Single Zone 0
Coalbed GaS ❑ Gas Hydrates
Rednll 0 Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5, Bond Blanket 0 Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU 11-37A
3. Address:8653.5
6. Proposed Depth. ,
12. Field/Pool(s):
P.O. Box 196612 Anchorage. AK 99519-6612
MD: 10862' TVD:ss 8600'ss r
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028325
Surface: 4628' FSL, 4639 FEL, Sec. 34, T71 N, R15E, UM
8. DNR Approval Number:
13. Approximate spud date:
Top of Productive Horizon: 4610' FSL, o FEL, Sec. 33, T11 N, R15E, UM
70-054
July 15, 2019 ,
9. Acres in Property: 2560
14. Distance t0 Nearest Property:
Total Depth: 1208' FSL, 876' FWL, Sec. 27, T11 N, R15E, UM
30590
4b, Location of Well (State Base Plane Coordinates - NAD 27):
10, KB Elevation above MSL: 53.5 feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 708213 y- 5951091 Zone - ASP 4
GL Elevation above MSL: 27.0 feet
1000
16. Deviated wells: Kickoff Depth: 8570 feel
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 110 degrees
Downhole: 3373 Surface: 2493
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casino Weight Grade Coudina Length
MD TVD MD TVD(including stage data
4-1/4" 3-1/4'x2-7/8" 6.6#/6.5# 13Cr85 TCII/STL 3361'
7500' 7414'ss 10862' 8600'ss 281 sx Class'G' v/
19PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft). Total Depth TVD (ft):
Plugs (measured):
Effect, Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
10440 8858
8710, 8720,8990,9272
8710
8603
9144
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 217 260 sx Arctic Set (ADDrox.) 27-107 27-107
Surface 3783 9.5a, 2231 sx CS III. 335 sx Class'G' 26-3809 26-3803
Intermediate 9302 7' 320 sx Class'G' 25-9327 25-8891
Production
Liner 1235 4-1/2" Uncemented Slotted Liner 9205-10440 8876-8858
Perforation Depth MD (ft): 8622-10417 Perforation Depth TVD (ft): 8521 - 8658
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Ciolkosz. Ryan R
from without prior written approval.
Authorized Name Mclaughlin, Sean M Contact Email Ryan.Ciolkoszlpbp.com
Authonzed Title Engineering Team Lead - CTD Contact Phone *1 907 564 5977
ty
Authorized Signature — ✓ Date Y1 611 q
Commission Use Only
Permit to Drill API: 50- 029-22718-01-00 Permit Approval See cover letter for other
Number: a 19-•Q� Date: y 3
,� requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: {�
Other: Samples req'd: Yes ❑ No &W, Mud log neq'd: Yes ❑ No 9"
1-12S measures Yes Ei No ❑ Directional svy req'd: Yes W No ❑
Spacing exception req'd: Yes ❑ No V Inclinationonly svy req'd: Yes ❑ No e
Post initial 11
MIT mq'd: Yes ❑/�
1
�,rT c.. &e 11-0 Will,ZSR/ ��Z� � a•'p�ro"e�" ��' `�"`"�'� p)#Jnjection
2PPROVED
7No
BY
Approved by: I THE COMMISSION Date:riVV1
URI VII4ML. AVVp
Form 10401 Revised! _ ) /` �� � R 14 �l F�
(//otiipyl_/ hls p n is valid for 24 months from the tlate of approval (20 AAC 25.005(8)) Submit Farm and
Attachments in Duplicate
B. Arlie/n
To: Alaska Oil & Gas Conservation Commission�IrI�
From: Ryan Engineer
2 by
CTD Engineer ''�
Date: April 16, 2019
Re: 11-37A Permit to Drill Request
Approval is requested for a permit to drill a CTD sidetrack lateral from well 11-37 with the Nabors CDR2
Coiled Tubing Drilling rig on or around July 1"_y_,2019.
Proposed plan for 11-37A:
The sidetrack 11-37A will be a "'2292' horizontal CST that will kick -out from the 11-37 parent in Zone 4B. The CST
will establish competitive offtake as a 24P and 22P lateral. The sidetrack will be drilled on or around July 151h, 2019. During
pre -rig work it is proposed to set a 4-1/2" x 7" Delta whipstock at a kickoff depth of ^8570' MD. It is planned to mill the
3.80" window + 10' of rathole with service coil (See window milling addendum attached). The rig will move in, test BOPS
and kill the well. The well will drill from Zone 4 to Zone 2 and then remain in Zone 2 for the duration. The proposed
sidetrack will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place. The cased hole will be logged
(GR/CCL/RPM) and selectively perforated.
Pre -Rig Work (scheduled to begin May 1'h, 2019)
1.
SL
Dummy GLMs. MIT -IA. Drift for Whipstock
2.
EL
Set Delta Whipstock.
3.
C
Mill XN. Mill Window.
4.
V
Pre -CTD Tree work.
Rig Work (scheduled to begin July 151i, 2019)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2493 psi). A0
2.
Drill production section: 4.25" OH, `2292' (30 deg DLS build, 12 deg DLS lateral planned).
3.
Run 3-1/4" x 2-7/8" 13Cr liner to TD.
4.
Pump primary cement job: 58 bbis, 15.3 ppg Class G, TOC at TOL (^'7500' MD)*.
5.
Perform Cleanout/Logging run with GR/CCL/RPM.
6.
Perforate Wellbore. 2" Millennium guns planned ("600', 6spf, planned).
7.
Freeze protect well to a min 2,200' TVDss.
8.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. V: Valve & tree work
2. SL/FB: Set LTP if needed. PT LTP. Set KO GLD. Drift pre CT
3. T: Portable test separator flowback (if perf 500' or more), about 5 days
4. POP well and flow.
P -4--a
PTt>
2)4-6(oZ
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (471 psi over -balance).
Disposal:
• All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >11 must go to GNI.
Hole Size:
• 4.25" for entirety of the production hole section.
Liner Program:
• 2-7/8", 6.5k, STL, 13Cr solid liner:
• 3-1/4", 6.6ff, TCII, 13Cr solid liner:
9170' MD —10,861' MD
7500' M D — 9170' M D
• A planned 58 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 7500' MD).
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (471 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 110°, inclination at kick off point is 16'.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property — 30,590'
• Distance to nearest well within pool — 1000'
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
• GR/CCL/RPM cased hole logs will be run inside the production liner.
Perforating:
• Perforating: —600' of perforations, 2", 60 deg random phasing, 6 spf, perfguns.
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (471 psi over -balance).
• A X -aver shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards:
• DS 11 is an H2S pad. Max recorded H2S reading on 11-37: 22 ppm on 11/16/18. Max H2S recorded on the pad: 825
ppm on 11-01 on 2/7/16.
• One potential fault crossing with a 5' DTS throw and low Lost circulation potential.
• Lost circulation risk is considered Low.
Reservoir Pressure:
• The reservoir pressure on 11-37A is expected to be 3373 psi at 8800' TVDSS (7.37 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2493 psi. ✓
• A min EMW of 8.4 ppg for this well will provide 471 psi over -balance to the reservoir.
V
Ryan Ciolkosz CC: Well File
CTD Engineer Joseph Lastufka
564-5977
BKR C
3F. ELEV_ _
(OP =
Vla�le - 94"
)abet MD =
)akm ND= I
NT-13CR-80 NSOC,
D = 6.184"
ID= I
9-5/8" CSG, 40k, L-80 BUrT, D = 8.835" —t 3809'
Minimum ID = 3.726" @ 7646'
4-1/2" HES XN NIPPLE
1.4-12" TBG, 12.611 13CR80 VAM TOP,
0152 bpf, D = 3.958'
7' CSG. 269. L-80..0383 bof. D = 6.276"
8769'
ITOPOF4-1/2"LNR
4-12" LNR, 12.69, L-80 XO TO 13CR-80 NSCi
PHWORATDN Sll&MARY
REF LOG: NOT ON DEPTH w/ MWD
ANGLEAT TOP PEF F: 20' @ 8822'
Nobe: Refer to Production 06 for historical pert data
SIZE
SPF
INTERVAL
Opn/Sqz
SHOT
SQZ
2-12"
6
8622-8632
O
05/15/17
RWO
2-12"
6
8743 -8748
C
01/17/17
DNN BK
3-318'
6
8758 -8773
C
03/17/15
0523/16 RCTIJMD
3-W'
6
8800 -8808
C
0925/97
KBG-2
3-3/8"
12
8812 - 8814
C
07/1797
2-718'
6
8815-8820
C
12/10/01
1
3-39"
6
8854 - B860
C
07/31/05
3-38'
6
8890-8898
C
07/31/05
6574
338"
6
8902-8906
C
07/31/05
3-31W
6
8918-8926
C
07/31/05
7330
3-39"
6
8953 -8973
C
08101/11
09/12/11
338"
6
9160-9165
C
082397
11-37 MA- JOGL G: 6E@ 843E `CHRO ME TBG,"
LNR, & CSG"'"
2087' 4-12' HES X NW,- = 3.813"
GAS LFT MANDRELS
7481' 4-12" 116 X NP, D = 3.813'
7502' 7' X4-12"BKR S-3 PKR, D= 3.875"
j 7580' -14-12- WLEr, D=3.958"
7576'—NEM Tr LOGGED ON 07/30/05
8710' EST TOC (OS/16/17)
8720' POSISET PLUG (05115117)
899W 1-17' HES EZSV (04/07/05)
9� 7"X4 =3SS
PKK D 905
.905'
9262' 4-12' PORTED JOI
MILLOUT WNDOW (1137) 9356'
i
DATE
REV BY
COMMENTS
lST
I REV BY I COMMENTS
MD
TVD
DEV
TYPE
VLV
POffr
DATE
RWO
5
2999
2973
5
KBG-2
DNN BK
0
09/12/11
CSGI LNR CORRECTION PER TALLY
04/16/19
JNUJMDJELEVATIONCORRECTIONS
0523/16 RCTIJMD
FISHED BP 05117/16)
4
4111
4075
1
KBG-2
DONE BK
16
09/12/11
3
5912
5885
1
KBG-2
DOKE BK
16
09/12/11
2
6601
6574
1
KBG-2
0&N BK
0
04/19/05
1
7330
7288
20
KBG-2
SO BK
22
09/12/11
7481' 4-12" 116 X NP, D = 3.813'
7502' 7' X4-12"BKR S-3 PKR, D= 3.875"
j 7580' -14-12- WLEr, D=3.958"
7576'—NEM Tr LOGGED ON 07/30/05
8710' EST TOC (OS/16/17)
8720' POSISET PLUG (05115117)
899W 1-17' HES EZSV (04/07/05)
9� 7"X4 =3SS
PKK D 905
.905'
9262' 4-12' PORTED JOI
MILLOUT WNDOW (1137) 9356'
i
DATE
REV BY
COMMENTS
DATE
I REV BY I COMMENTS
1210198
0-16
ORIGINALCOWLETION
07/19/16
CJSUMD SETH EX PLUG 07/17/16)
04/1085
0-16
RWO
01/31/17
MS/JMD ADPERFS (01/17/17)
03/17/15 CJS/PJC
SET CBP/ADPERF
05117/17
W/JM SET PLUG/CMT&ADPERFS
03118/15
PJC
CSGI LNR CORRECTION PER TALLY
04/16/19
JNUJMDJELEVATIONCORRECTIONS
0523/16 RCTIJMD
FISHED BP 05117/16)
0620/16
RM/JMD
CORRECTED OA CMT -REMOVED
PRUDHOE BAY UNIT
WELL:911-37
PERMIT No:9961740
API No: 50-029-22716-00
T71 N, R15E, 4029' FEL & 488
BP Exploration (Alaska)
TREE= Cow
WELLFEAD=
FMC
ACTUATOR=
BKRC
103. BEV to
54'
BF. BEV =
r.
KOP=
6970'
Msx Angle =
94• Q 9483'
DsWm MD=
9120'
Dslum TVD=
8800' Ss
11-37A&. PROPOSED
7' GSC, 290, 64• c
NT -13032-80 NSOC,
D=6.164'
0. ?
ID=-' I
9-5/8' CBG, 400• L-80 BUR. D - 8.835' *
Minimum ID = 3.726" @ 7667'
4-1/2" HES XN NIPPLE
4-12' TBG. 12.69, 13CR-80 VAM TOP,
.0152 bp1, D = 3.858'
1 7678' 1
3-1/4', 6.5#, TCL 13CR-65 9170'
Baker 4-12' x 7• DELTA VV PSTOCK J8670'
PERFORATION SUMMARY
REF LOO: NOT ON DEPTH e / MIND
ANOLEAT TOP PERF: 20.0 8622'
New: Refer to Pre•oslbn oa for aYbrtalped raw
5ME
SPF
INTERVAL
aan•a
SNOT
SOz
r.
a
622 - 9933
O
:5/1
DAM
2-1rs•
•
1743-1748
c
n5117
ovn7
1
3-317•
0
9719-5773
C
03117/15
3 5911
a -an•
•
8100 - 8808
O
99a5RN
16
0-316•
12
8912 -8514
c
07"?N?
DMV
2-7Al•
•
91115 - 9920
c
+2naN+
2D
a -ala•
•
8954-8860
c
071a1as
3-3189
a
a9ao - 81211
c
o7n7RlS
Gale•
s
8802 - oas
c
07171.:
3 -ala•
8
800-8828
C
07n1n5
3-318•
s
1258 - 1778
p
8.173117
,-,a-
6
9180 -Has
O
0812MT
a-1789
•
0201.-92.2
c
08170177
•-trs• alto
0203 - 10417
SLOTIC 12MIN0
FA
. 7 NOTES: WELL ANGLE> 70• Q 9078'•••
X DOGLEG: 14.6• @ 8437' ••• CHROME TBG,
R, 8CSG •••
2072' 4-12' HESX NP, D = 3.813'
GAS LFT MANDRELS
ST AID
TVD
DEV
TYPE
VLV
07/19/16 CJSIJND SET FFX PLUG (07/17/16)
FORE
DATE
5 zsse
2992
s
KBG2
DAM
BK
0
09/12/11
4 4101
4095
1
KBG-2
DOME
BK
16
09/12/11
3 5911
5905
1
KBG-2
DONE
BK
16
09/12/11
2 6601
6595
1
KBG-2
DMV
BK
0
04109/05
1 7330
7307
2D
KBG-2
$O
SK
22
09/12/11
{7'X4-12'BKRS-3PKKD=3.875.
3.70' DEIDY SLEEVE io=3.OP
X NFPLE
'HES XN NP. D = 3.725'
7678• B.MTTLOGG®ON07TJ0/OS
2-7/8', 6.50. STL, 13CR-85 _ - 108s�
DATE REV BY
COMMENTS
DATE I REV BY I CDAMBJIS
12101196 616
ORIGINAL COMPLEnON
07/19/16 CJSIJND SET FFX PLUG (07/17/16)
04/10105 M16
FANO
01/31/17 A18./JA1D ADPEFFS(01/17117)
03/17115 CJS/ PJC
SET CBPP ADPEFF
05/17/17 WWJRC SET PLUGICMT 8 ADPEFFS
03/16/15 PJC
CSGI LN2 COF03a)DN PER TALLY
05/23/16 RCVJM
RSFEDBP(05117/16)
0620/16 RMJND CDffiT:CT®OA C'YR-RBvWED
PRUDHOE BAY UNT
VVE31L 11-37
Fi31NIT N7:'1961740
API N7: 50.029-2271600
Tl IR RI 5F 4029' FB- 8 4884' FTL
BP Blplorallon (Alaska)
by
North America - ALASKA - BP
PBU
11
11-37
PLAN 11-37A
Plan: 11-37A WP04
BP Coil Tubing Report
11 April, 2019
lett PBU, PBU, PRUDHOE
I System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Datum: NAD27' OGP-Usa AK 14267'156641 Using Well Reference Point
I Zone: NAD27' OGP-Usa AK / Alaska zone 4 (26734'1586 Using geode8c scale factor
Site
11, TR -11-15
BP
Site Position:
by
Northing:
BP Coil Tubing Report
From:
Map
Company:
North America - ALASKA - BP
Position Uncertainty:
Local Co-ordinate Reference:
Well 11-37
Project:
PBU
11-37,11-37
TVD Reference:
Mean Sea Level
Site:
11
Northing:
MD Reference:
KB Q 53.50usft
Well:
11-37
708,212.770 usft
North Reference:
True
Wellbore:
PLAN 11-37A
Survey Calculation Method:
Minimum Curvature
Design:
11-37A WP04
Database:
EDM R5K - Alaska PROD - ANCP1
lett PBU, PBU, PRUDHOE
I System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Datum: NAD27' OGP-Usa AK 14267'156641 Using Well Reference Point
I Zone: NAD27' OGP-Usa AK / Alaska zone 4 (26734'1586 Using geode8c scale factor
Site
11, TR -11-15
—�-�
Site Position:
Northing:
5,949,527.780 usft
From:
Map
Easting:
707,585-650 usft
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Well
11-37,11-37
Well Position
-NI-S 0.00 usft
Northing:
5,951,090.590 usft
+EI -W 0.00 usft
Easting:
708,212.770 usft
Position Uncertainty
0.00 usft
Wellhead Elevation:
29.31 usft
Wellbore PLAN 11-37A
Magnetics Model Name Sample Date Declination
BGGM2018 8/1/2019 16.84
Design 11-37A WP04
Audit Notes:
Version: Phase: PLAN
Vertical Section: Depth From (TVD( +NI -S
(usft( (usft(
-29.31 0.00
Latitude: 70° 15'55S50 N
Longitude: 148° 19'17 134 W
Grid Convergence: 1.56
Latitude: 70° 16' 11.045 N
Longitude: 148° 18' 57.630 W
Ground Level: 27.00 usft
Dip Angle Field Strength
(nT)
80.93 57,413
Tie On Depth: 8,533.36
+E/ -W Direction
(usft) (°)
000 7.07
4/112019 12.27.42PM Fage 2 COMPASS 5000.1 Build SID
Company:
North America - ALASKA -BP
Project:
PBU
Site:
11
Well:
11-37
Wellbore:
PLAN 11-37A
Design:
11-37AWP04
Survey Tool Program
Date 4/11/2019
From
To
Well 11-37
(usft)
(usft) Survey (Wellbore)
146.00
8,533.36 1 : MWD - Standard (11-37)
8,533.36
10,862.20 11-37A WP04 (PLAN 11-37A)
Planned Survey
Mean Sea Level
MD
Inc AzI
(usft)
8,533.36
15.36
338.62
Actual Survey 11-37
8,557.05
15.82
349.49
TSAD
True
8,565.70
16.11
353.26
TIP
8,570.00
16.37
354.94
KOP
8,590.00
18.07
352.96
4
EDM R5K - Alaska PROD - ANCP1
8,600.00
20.92
350.08
8,630.00
29.62
344.68
5
8,64042
32.48
347.14
42N
8,645.19
33.80
348.14
42P
MWD - Standard
8,700.00
49.38
356.19
8,712.98
53.13
357.53
TCGL
EIW
Northing
8,800.00
78.53
4.26
8,801.61
79.00
4.37
6
(usft)
(usft)
BP
BP Coil Tubing Report
41112019 12.27.42PM Page 3 COMPASS 5000.1 Build BID
Local Co-ordinate Reference:
Well 11-37
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 53.50usft
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Tool Name
Description
MWD
MWD -Standard
MWD
MWD - Standard
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(usft)
(usft)
('I100usft)
(usft)
C)
8,383.17
-42.53
-649.27
5,951,030.122
707,564.960
0.00
-122.16
0.00
8,406.00
-36.43
-651.00
5,951,036.170
707,563.058
1246
-116.32
86.41
8,414.31
-34.08
-651.36
5,951,038.508
707,562.638
12.46
-114.03
75.93
8,418.44
-32.88
-651.48
5,951,039.701
707,562.481
1249
-112.86
61.85
8,437.54
-27.00
-652.11
5,951,045.567
707,561,690
9.00
-107.10
-20.00
8,446.97
-23.70
-652.61
5,951,048.850
707,561.101
30.00
-103.89
-20.00 _
8,474.08
-11.25
-65549
5,951,061.217
707,557.871
30.00
-91.89
-17.29
8,483.00
-6.03
-856.80
5,951,066.389
707,556.425
30.00
-86.87
25.00
8,487.00
-3.48
-657.36
5,951,068.924
707,555.796
30.00
-84.41
22.89
8,527.89
32AA
-661.90
5,951,104.706
707,550.260
30.00
49.32
22.05
8,538.00
42.53
-662.45
5,951,114.776
707,549.431
30.00
-39.38
15.97
8,571.38
121.21
-660.75
5,951,193.472
707,548.954
30.00
38.92
15.14
8,571.70
122.79
-660.63
5,951,195.053
707,549.030
30.00
40.50
12.31
41112019 12.27.42PM Page 3 COMPASS 5000.1 Build BID
Company:
North Americo- ALASKA - BP
Project:
PBU
Site:
11
Well:
11-37
Wellbore:
PLAN 11-37A
Design:
11-37A WP04
Planned Survey
MO
Inc
(usft)
(°)
8,845.12
79.00
BCGL
Well 11-37
8,900.00
79.00
8,955.18
79.00
TD
8,997.10
79.00
24N
9,000.00
79.00
9,061.61
79.00
7
9,100.00
76.73
9,102.67
76.57
24P
KB @ 53.50usft
9,167.20
72.91
23N
9,177.26
72.36
24N
North Reference:
9,196.51
71.33
23P
9,200.00
71.15
9,220.72
70.07
22N
9,222.11
70.00
8
Minimum Curvature
9,232.42
70.00
24P
9,282.12
70.00
22P
Database:
Azl
(°)
BP
BP Coil Tubing Report
4/112019 12:2742PM Page 4 COMPASS 5000.1 Build 81D
Local Co-ordinate Reference:
Well 11-37
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 53.50usft
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft(
(usft(
(usft(
(usft)
(°It00usft)
(usft(
(°)
9.69
8,580.00
165.16
-655.41
5,951,237 546
707,553.078
12.00
83.19
9048
16.39
8,590.47
217.61
-643.26
5,951,290.315
707,563.770
12.00
136.74
90.66
23.14
8,601.00
268.56
-624.95
5,951,341.741
707,580.657
12.00
169.55
90.62
28.26
8,609.00
305.63
-607.12
5,951,379.292
707,597.463
12.00
228.53
90.48
28.61
8,609.55
308.13
-605.76
5,951,381.831
707,598.748
12.00
231.18
90.61
36.14
8,621.31
359.17
-573.40
5,951,433.746
707,629.687
12.00
285.82
90.72
40.24
8,629.38
388.66
-550.20
5,951,463.865
707,652.052
12.00
317.95
120.00
40.53
8,630.00
390.64
-548.52
5,951,465.891
707,653.681
12.00
320.12
119.14
47.60
8,647.00
435.36
-505.29
5,951,511.784
707,695.661
12.00
389.82
119.07
48.73
8,650.00
441.76
-498.14
5,951,518.379
707,702.630
12.00
377.05
117.21
50.91
8,656.00
453.57
-484.16
5,951,530.568
707,716.277
12.00
39049
116.87
51.30
8,657.12
455.64
-481.59
5,951,532.710
707,718.787
12.00
392.86
116.19
53.68
8,664.00
467.54
-466.09
5,951,545.033
707,733.951
12.00
406.58
116.06
53.84
8,664.47
468.31
-465.04
5,951,545.833
707,734.981
12.00
407.47
115.28
52.52
8,668.00
474.12
-457.28
5,951,551.851
707,742.573
12.00
414.19
-90.06
46.17
8,685.00
504.53
-421.86
5,951,583.229
707,777.134
12.00
448.73
-91.08
4/112019 12:2742PM Page 4 COMPASS 5000.1 Build 81D
M
Company:
North America - ALASKA - BP
Project
PBU
Site:
11
Well:
11-37
Wellbore:
PLAN 11-37A
Design:
11-37A WP04
Planned Survey
MD
(usft)
9,287.97
23N
9,300.00
9,308.43
23P
9,340.60
22N
9,369.11
9
9,381.94
22P
9,400.00
9,437.12
OWC
9,500.00
9,559.07
10
9,600.00
9,691.82
11
9,700.00
9,800.00
9,802.17
12
9,900.00
10,000.00
10,092.17
13
10,100.00
4111/2019 12:27:42PM
BP
BP Coil Tubing Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 11-37
Mean Sea Level
KB @ 53.50usft
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
Inc
Azi
TVDSS
NIS
ENY
Northing
Easting
DLeg
V. Sec
TFace
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
O
70.00
45.43
8,687.00
508,36
-417.92
5,951,587.167
707780.965
1200.
453.02
-90.23
70.00
43.89
8,691.12
515.40
-409.98
5,951,595.426
707,788.687
12.00
461.98
-90.36
70.00
42.81
8,694.00
522.16
-004.54
5,951,601.337
707,793.966
12.00
468.37
-90.01
70.00
38.71
8,705.00
545.05
-384.81
5,951,624.759
707,813.052
12.00
493.51
-90.71
70.00
35.07
8,714.75
566.47
-368.73
5,951,646818
707,828.531
12.00
516.75
-90.67
71.34
35.88
8,719.00
576.34
-361.70
5,951,656.672
707,835.284
12.00
527.41
30.00
73.22
37.00
8,724.50
590.17
-351.48
5,951,670.786
707,845.114
12.00
542.40
29.73
77.11
39.24
8,734.00
618.39
-329.33
5,951,699.607
707,866.478
12.00
573.13
29.39
83.75
42.89
8,744.45
665.09
-288.61
5,951,747.410
707,905.885
12.00
62449
28.82
90.00
46.24
6,747.67
707.08
-247.25
5,951,790.528
707,946.072
12.00
671.25
28.21
94.25
43.78
8,746.15
735.99
-218.33
5,951,820224
707,974.177
12.00
703.50
-30.00
103.75
38.12
8,731.79
804.34
-158.95
5,951,890.189
708,031.643
12.00
778.65
-30.09
102.88
38.59
8,729.91
810.59
-154.01
5,951,896.567
708,036.409
12.00
785.45
152.00
92.23
44.17
6,716.77
884.79
-88.55
5,951,972.550
708,099.783
12.00
867.15
152.11
92.00
44.29
8,716.69
866.35
-87.03
5,951,974.147
708,101.255
12.00
868.88
152.85
91.86
32.55
8,713.38
962.82
-26.38
5,952,052259
708,159.764
12.00
952.24
-90.50
91.63
20.54
8,710.33
1,052.07
18.21
5,952,142.706
708,201.865
12.00
1,046.30
-90.90
91.36
9.48
8,707.92
1,140.93
42.04
5,952,232.185
708,223.228
12.00
1,137.42
-91.26
91.36
10.42
8,707.73
1,146.63
43.39
5,952,239.926
708,224.367
12.00
1,145.23
89.50
Page 5
COMPASS 5000.1 Build 810
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-37
Wellbore:
PLAN 11-37A
Design:
11-37A WP04
Planned Survey
MD
(usft)
10,200.00
10,292.17
14
10,300.00
10,400.00
10,492.17
15
10,500.00
10,600.00
10,673.32
18
10,700.00
10,800.00
10,862.22
TD at 10862.22
BP
Blo Coil Tubing Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Inc
Ald
TVDSS
NIS
E1W
Northing
P)
(°)
(usft)
)usft)
(usft)
(usft)
91.43
22.43
8,705.28
1,244.35
7160
5,952,336.380
9144
33.49
8,702.96
1,325.61
114.74
5,952,418.802
91.44
32.55
8,702.76
1,332.17
119.00
5,952,425.477
91.41
20.55
8,700.27
1,421.44
163.60
5,952,515.936
91.32
9.48
8,698.07
1,510.30
187.44
5,952,605.420
92.13
9.01
8,697.84
1,518.02
188.69
5,952,613.172
102.49
2.90
8,685.12
1,616.48
199.03
5,952,711.878
110.00
358.12
8,664.61
1,686.80
199.71
5,952,782.181
110.00
1.53
8,655.48
1,711.86
199.63
5,952,807.235
110.00
14.30
8,621.28
1,804.75
212.54
5,952,900.435
• 110.00
22.24
• 8,600.00
1,860.22
230.85
5,952,956.394
Well 11-37
Mean Sea Level
KB @ 53.50usft
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Fasting
DLeg
V. Sec
TFace
(usft)
(°NOOusft)
(usft)
(°)
708,249.922
1200.
1,243.69
89.52
708,290.788
12.00
1,329.65
89.82
708,294.868
12.00
1,336.69
-90.00
708,336.980
12.00
1,430.76
-90.02
708,358.348
12.00
1,521.89
-90.32
708,359.391
1200.
1,529.70
-30.00
708,366.997
12.00
1,628.69
-30.01
708,365.732
12.00
1,698.55
-30.80
708,364.961
12.00
1,723.42
89.42
708,375.292
12.00
1,817.18
87.81
708,392.063
12.00
1,874.49
88.64
4/11/2019 12:27:42PM Page 6 COMPASS 50001 Build 81D
BP
BP Coil Tubing Report
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well 11-37
Project:
PBU
ND Reference:
Mean Sea Level
Site:
11
MD Reference:
KB (d 53.50usft
Well:
11-37
North Reference:
True
Wellbore:
PLAN 11-37A
Survey Calculation Method:
Minimum Curvature
Design: 11-37A WP04 Database: EDM R5K - Alaska PROD - ANCP1
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
•N/ -S
-EI-VV
(usft)
(usft)
(usft(
(usft)
Comment
8,533.36
8,383.17
-42.53
-649.27
Actual Survey 11-37
8,565.70
8,414.31
-34.08
-651.36
TIP
8,570.00
8,418.44
-32.88
-65148
KOP
8,590.00
8,437.54
-27.00
-652.11
4
8,630.00
8,474.08
-11.25
-655.49
5
8,801.61
8,571.70
122.79
-660.63
6
9,061.61
8,621.31
359.17
-573.40
7
9,222.11
8,664.47
468.31
-465.04
8
9,369.11
8,714.75
566.47
-368.73
9
9,559.07
8,747.67
707.08
-247.25
10
9,691.82
8,731.79
804.34
-158.95
11
9,802.17
8,716.69
886.35
-87.03
12
10,092.17
8,707.92
1,140.93
42.04
13
10,292.17
8,702.96
1,325.61
114.74
14
10,492.17
8,698.07
1,510.30
187.44
15
10,673.32
8,664.61
1,686.80
199.71
16
10,862.22
8,600.00
1,860.22
230.85
TO at 10862.22
4/112019 12:27:42PM Page 7 COMPASS 5000.1 Build 810
North America - ALASKA - BP
PBU
11
11-37
PLAN 11-37A
11-37A W PO4
Anticollision Summary Report
11 April, 2019
z by
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
11
Site Error:
O.00usft
Reference Well:
11-37
Well Error:
O.00usft
Reference Wellbore
PLAN 11-37A
Reference Design:
11-37A WP04
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-37
Mean Sea Level
KB @ 53.50usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
11-37A WP04
Filter type:
GLOBAL FILTER APPLIED: All wellpalhs within 200'+ 100/1000 of reference
Interpolation Method:
MD Interval 100.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,283.80usft Error Surface:
Elliptical Conic
Survey Tool Program Date 4/11/2019
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
146.00 8,533.361: MWD- Standard (11-37) MWD MWD- Standard
8,533.36 10,862.2011-37A WP04(PLAN 11-37A) MWD MWD -Standard
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
04
04-05 - 04-05 - 04-05
Out of range
04-05 - 04-05A- 04-05A
Out of range
11
11-02-11-02-11-02
3,206.00
3,200.00
513.81
47.83
467.84
Pass - Major Risk
11-04 - 11-04 - 11-04
3,804.98
3,800.00
512.19
44.87
469.97
Pass- Major Risk
11 -04 -11 -04A -11-04A
3,806.77
3,800.00
512.21
44.88
469,98
Pass - Major Risk
11-04 - 11-04APBI - 11-04APB1
3,806.77
3,800.00
512.21
44.88
469.98
Pass- Major Risk
11-16-11-16-11-16
1,094.94
1,100.00
184.82
17.64
167.18
Pass - Major Risk
11 -16 - 11-16PBI - 11 -16PB1
1,094.94
1,100.00
184.82
17.64
167.18
Pass - Major Risk
11-17 - 11-17 - 11-17
2,096.00
2,100.00
133.94
29.71
104.23
Pass - Major Risk
11-17 - 11-17A - 11.17A
2,099.15
2,100.00
133.98
29.74
104.25
Pass - Major Risk
11-18-11-18-11-18
1,996.66
2,000.00
70.05
26.84
43.22
Pass - Major Risk
11-22 - 11-22 - 11-22
791.85
800.00
237.70
16.07
221.63
Pass- Major Risk
11-22 - 11-22A- 11-22A
796.52
800.00
237.75
16.17
221.58
Pass- Major Risk
11-22 - 11-22AL1 - 11-22ALl
796.52
800.00
237.75
16.17
221.58
Pass- Major Risk
11-37-11-37-11-37
8,93273
9,000.00
206.92
0.64
206.92
Pass-NOERRORS
11-38-11-38-11-38
5,890.47
5,900.00
730.26
41.52
690.61
Pass - Major Risk
11 -38 -11 -38A -11-38A
5,890.47
5,900.00
730.26
41.52
690.61
Pass - Major Risk
4/11/2019 10:42,13AM Page 2 of 3 COMPASS 5000.1 Build BID
0 hp
Company:
North America -ALASKA - BP
Project:
PBU
Reference Site:
11
Site Error:
O.00usft
Reference Well:
11-37
Well Error:
0.00usR
Reference Wellbore
PLAN 11-37A
Reference Design:
11-37A WP04
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-37
Mean Sea Level
KB @ 53.50us%
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to KB @ 53.50usft
Coordinates are relative to: 11-37
Offset Depths are relative to Offset Datum
Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150' 0'0,000 W °
Grid Convergence at Surface is: 1.59'
Ladder Plot
Measured Depth (2000 usfUin)
LEGEND
-Ar 11-02,11-02,11-02 V1
-A- 11-18,11-18,11-18V1
$ 11-22,11-22,11-22V1
—!� 11-04,11-04,11-04 V1
—4— 11-07,11-37,11-37V1
—K— 11-22,11-22AL1,11-22AL1 VO
$ 11-04,11-04A, 11-04A V1
$ 11-38,11-38,11-38V6
—rte 11-22,11-22A, 11-22A VO
$ 11-04,11-04AP61,11-04APB1
V1 $ 1138,11-38A, 1138A V2
} 11-16,11-16,11-16V1
$ 11-17,11-17,11-17V1
$ 04-05,04-05A, 04OSAVl
$ 11-16.11-16PB1, 11-16PB1 V1
—XE 11-17,11-17A, 11-17A V13
$ 04-05,04-05,04-05 V1
$ 11-37AWP04
4/1112019 10:4213AM Page 3 of 3 COMPASS 5000 1 Build 81D
2800
2611U
2"^^
Imurhs uTme Ncdn
Magnetic NOM: i6 e4°
Magnefc Field
9reNth 574132snT
OIpmgk'. 90.92°
Oale. 8/112019.
MpdeI: BGGMM10
11-37A WP04 04-0,
West( -)/East(+) (200 usR/in)
tl4UU w KOTIP
P
8450 d3a
4 �
8500
11-37A WP04 I1-37A1WP04
5550 /BML
��� 11-37AT3.
tmwW 24P 6
8" I Maras,
N
7 II -37A R
8]00'�OWC 8 II-37ATI 16
8750 9 12 13 14
Is
� 11
9
F. 8800-
8850
8900-
-IMea015$B Lgy} 0 50 100 150 200 750 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 14M 1450 15W 1550 1600 16M 1700 1750 ISM 1850 1900
Vertical Section at 7.07° (50 ustVin)
DETAILS: 11-37
WELLBORE DETAILS: PLAN 11-37A,
PEFERE EINFI'> 1108
bWELL
n
Project: PBII
ANNOTATIONS
7"
Sita: 11
Gra Level
Am
Co Wtl11f3],TnIeMM
-WS
Well: 11.3]
Northing: 5051090.590
No 5!r51
ParaM Wellbore:
V.6,A(lt4Et
VedkaN7V111. Meen6BONI
TVD
Wellbore: .374
Eaitude: 7081611.0
853& 1
Te on MO: 8533.36 I'
j
6,WWpM
338.62
1147APUN
Design: ll -07A WP04
70°i6''57.63N
LattLongitude
549.27
W.Icu4mbDepin: K3@53,50uch
0.00
-122.16
Longitutle: 148° 18' 5].630 W
',
MinimmCumi
Gk4albn Metlp4: Minilwm Cun'alure
2800
2611U
2"^^
Imurhs uTme Ncdn
Magnetic NOM: i6 e4°
Magnefc Field
9reNth 574132snT
OIpmgk'. 90.92°
Oale. 8/112019.
MpdeI: BGGMM10
11-37A WP04 04-0,
West( -)/East(+) (200 usR/in)
tl4UU w KOTIP
P
8450 d3a
4 �
8500
11-37A WP04 I1-37A1WP04
5550 /BML
��� 11-37AT3.
tmwW 24P 6
8" I Maras,
N
7 II -37A R
8]00'�OWC 8 II-37ATI 16
8750 9 12 13 14
Is
� 11
9
F. 8800-
8850
8900-
-IMea015$B Lgy} 0 50 100 150 200 750 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 14M 1450 15W 1550 1600 16M 1700 1750 ISM 1850 1900
Vertical Section at 7.07° (50 ustVin)
SECTIONDETAILS
ANNOTATIONS
Sec
MD
Inc
Am
ssND
-WS
-EFW
Dleg
TFace
VSect Target
TVD
MD Anwation
1
8533.36
15.36
338.62
8383.17
4153
549.27
0.00
0.00
-122.16
8383.17
8533.36 Actual&u 11.37
I 2
8565.70
16.11
353.26
8414.31
-34.08
551.36
12.46
86.41
-114A3
8414.31
856570 TIP
3
8570.00
16.37
354.94
8418.44
-3248
551.48
12.49
51.85
.112.86
8418.44
8570.00 KOP
4
8590.00
18.07
352.96
8437.54
-27.00
552.11
9.00
-20.00
-107.10
8437.54
8590.00 4
5
8630.00
29.52
344.68
8474.08
-11.25
555.49
30.00
-20.00
-91,59
8474.08
8630.00 5
6
8801.61
79.00
4.37
8571.70
122.79
.660.63
30.00
25.00
40.50
8571.70
8801.61 6
7
9061.61
79.00
36.14
8621.31
359.17
37340
12.00
90.00
285.82
8621.31
9061.61 7
8
9222.11
70.00
5384
856447
468.31
465.04
12.00
120.00
407.47
8654.47
9222.11 8
9
9369.11
70.00
35.07
8714.75
566.47
-368.73
12.00
-90.00
516.75
8714.75
9369.11 9
10
9559.07
90.00
46.24
8747.67
707.08
-247.25
12.00
30.00
67115
8747.67
955907 10
11
9691.82
103.75
38.12
8731.79
804.34
-158.95
12.00
-30.00
778.65
8731.79
9691.82 11
12
980217
92.00
44.29
8716.69
886.35
-87.03
12.00
152.00
868.88
8716.69
980217 12
13
10092.17
91.36
9.48
8707.92
1149.93
42.04
12.00
.9050
1137.42
8707.92
1009Z17 13
14
10292.17
91.44
33.49
8702.96
1325.61
114.74
12.00
89.50
1329B5
8702961029217
14
15
10492.17
91.32
9.48
8698.07
1510.30
187.44
12.00
-90.001521,59
8698.071049217
15
16
10673.32
110.00
358.12
8664.61
1686.80
19971
12.00
-30.00
169855
8664.61
10673.32 16
17
1086212110.00
2214
860900
1860.22
230A5
12.00
90.001874.49
8600.001086222
TD at 10862.22
2800
2611U
2"^^
Imurhs uTme Ncdn
Magnetic NOM: i6 e4°
Magnefc Field
9reNth 574132snT
OIpmgk'. 90.92°
Oale. 8/112019.
MpdeI: BGGMM10
11-37A WP04 04-0,
West( -)/East(+) (200 usR/in)
tl4UU w KOTIP
P
8450 d3a
4 �
8500
11-37A WP04 I1-37A1WP04
5550 /BML
��� 11-37AT3.
tmwW 24P 6
8" I Maras,
N
7 II -37A R
8]00'�OWC 8 II-37ATI 16
8750 9 12 13 14
Is
� 11
9
F. 8800-
8850
8900-
-IMea015$B Lgy} 0 50 100 150 200 750 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 14M 1450 15W 1550 1600 16M 1700 1750 ISM 1850 1900
Vertical Section at 7.07° (50 ustVin)
Projeot: PEW
Site: 11
Well: 1147
Wellbore: PLAN7147A
Plan: 1147AWP00
ANT OLLISIDN SMWGS
COMPANY DEUR NUMAme,ca-AIASRA-BP
Infe,pola0oo Method 100,imemitZ.00
Cacubeon Method: M1tivoumCu uus
Depth Rage Fmm. 853326 To 1086222
Error System: ISCWSA
Resub Limbed By: Centre Dislance:1283.80
Scan Method Tra, Cylinder Nadh
Reference: Pb¢11-37AWP04(1147IPlANll-37A)
Bra, Surface: EllipicalConc
Warning Method Rules Based
Ladder Plot
Measured Depth (100 usft/in)
1.2 1-1 11.1si- 11.0
wt. oem�wvwv� - v�o•e�m
From Colour To MD
8533 8720
8720 9050
9050 10862
SURVEY PROGRAM NOM Amapa-ALASIW-W
Depth Frohn Depth To SumyPhn Tool
146.00 5533.36 1:MWD-SbMam 111471 MWD
6533.36 10862.20 11-37AWP04(PIAN11-37A) MWD
Ez
Pro]eet: Pau
SR.: 11
WELL DETAILS:
AMI-0MISION SETTINGS
COMPANY DETAILS: Nonh America - ALASKA - BP
Gtomld Lsval: 27.0
IntelpoWton Me0lod'. Mgintamal:25.00
Calculatam Method: Mmirmxm Curvature
Well: 1147
Nmhting' 5951090.590
DepNRan,Fmm'. 053325To 1066222
Eno. s"w.: IS6WSA
We9bdm: PLAN II -37A
Easting: 708212770
ftmulbRe Mm1 B, CtntrA 1283.80
M.MMS"ce: Tra,810b,1indw NOdh
Plan: 11.37.4 WP04
Lattongioxle: 70° 16' N
WP04u
Enor
57.63
LorgltWe: 148° 18' 57.830 W
VAum gMethod: Rules B%ed
Depth Range: 8533.36 To 10862.22
180
Azimuth from Nodh C] vs Centre to Centre Separation [10 Won]
SECTION DETAILS
Sec MDInc A9 TMD 1145 +V/ DIW TFace V ect
1 9533.38 15.36 338.62 8383.17 AZ53 449.27 oW 0.00 422.ifi
2 8565.70 16.11 353.26 8414.31 44.08 -651.36 12.46 86.41 -114.03
3 9570.W 16.37 354.94 8418." -3288 851.48 12,49 61.65 -112.86
4 MW.W 19.07 352.% 8437.54 -27.00 452.11 9.00 -20.00 -10].10
5 BMW 29,62 3",88 8474.03 -11.25 455.49 30.00 -0.00 -91.89
6 5801.61 79.00 4.37 8571.70 122.79 860.63 30.00 25.00 40.50
7 8061,61 79.00 35.14 8621.31 359.17 -573.40 12.00 90.00 2M.82
0 9222.11 70.00 53.84 8%4.47 468.31 1,65.04 1200. 120.W 407.47
9 9369.11 70.00 35.07 8714.75 %6.47 468.73 12.00 40.00 516.75
109559.07 90.00 48.24 8747.67 707.08 -247.25 12.00 30.00 671.25
11 9691.52 103.75 38.12 8731.79 904.34 -158.95 12.00 40.00 778.65
12 9802.17 92.00 44.29 8716.69 886.35 87.03 12.00 152.00 80,88
13 10092.17 91.36 9,48 8707.92 1140.93 4204 12.00 .40.501137.42
14 10292.17 91.44 33.49 8702% 1325.61 114.74 12.00 89.50 1329.65
15 10492.17 91.32 9." 8698.07 1510.30 187.44 12.00 40.00 1521.89
16 1073.32 110.00 358.12 8664.61 1686.80 199.71 12.00 30.01) 1698.55
BIIRYEYPROGRAM
DepNFmm DeMTo $.wmMlan T.1
146.00 8533.36 1: MVYD-SdrdaN 11147) MWD
85M.36 1
0%2.20 1147AWP04IPLW 11-37A) AND
Depth Range: 8533.36 To 10862.22
AZImu from NOM I'I vs Cemm toCmmrc Separmmmi301, Vmj
11-37
114. 9p, n w V� nM. W[NPn.11..1 vt 11-17. 11.111-. 9-0, vlt 942 iu7 nal vi 1'.. 1- ]M. 11- wus wK. oamv� val. uylu. 11,.11 w v �6. 11-11n1n ,w 11191.
Project: PBU
e f %Tu�xmn m.+au•
WELLBORE DETAIIS:_PIAN _11-3]A
_,i nEF6+ErvcFixFauwlgx
by
Well: 11.]7
Wellbore: PIAN 11-37AB
Design: 11-17A WP04 Plus 60%1MD
P4m m
se.�q�.smmT
�w viw+a.
we,�occ�,aiel
11-37A
ii-37
7lle on MD. 8533.38
Md t t Pnmenre wdlltil.TUNUM
`/eAedMolBdrem: *.Seslyd
4�u�yppN pGye® -MOOKOMM
celWe6on ixmoe. udmumcuA
A
_h'tiGe",
North America - ALASKA - BP
PBU
11
11-37
PLAN 11-37A
11-37A WP04 Plus 500ft MD
AOGCC Offset Well Report
11 April, 2019
1Nr
�eN= by
Company:
North Amanda -ALASKA -BP
Project:
PBU
Reference Site:
11
Site Error:
0 0ousft
Reference Well:
11-37
Well Error:
o.0ousft
Reference Wellbore
PLAN 11-37A
Reference Design:
11-37A WP04 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-37
Mean Sea Level
KB @ 53.50usft
True
Minimum Curvature
1.00 sigma
EDM RSK- Alaska PROD - ANCP1
Offset Datum
Reference
11-37A WP04 Plus 5008 MD
:filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
nterpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
lepth Range:
Unlimited Scan Method:
Trani, Cylinder North
Results Limited by:
Ma,rimum centerranter distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program Date 4/11/2019
From To
(usft) (usft) Survey (Wellbore) Tool Name
146.00 8,533.361: MWD - Standard (11 -37) MWD
8,533.36 11,362.22 11-37A WP04 Plus 500ft MD (PLAN 11-37 MWD
Summary
Site Name
Offset Well - Wellbore - Design
11
11-18- 11-16 - 11-16
11 -16 - 11-16PB1 - 11-16PB1
11-17 - 11-17 - 11-17
11 -17 - 11-17A- 11-17A
11-18 - 1148 - 11-18
11-37 - 11-37 - 11-37
11 -37 - PLAN 11-37A - 11-37A Ili
Description
MWD - Standard
MWD - Standard
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
1,084.94 1,100.00 184.82
1,094.94 1,100.00 184.82
2,095.96 2,100.00 133.94
2,099.06 2,100.00 133.98
2,046.08 2,050.00 70.69
8,850.38 8,925.00 166.21
10,862.22 10,862.22 0.00
41112019 12: 12 14PM Page 2 of 2 COMPASS 5000.1 Build 81D
Well Bighole
CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17
Quick Test Sub to Otis
Top of 7" Otis
0.0ft
--------- ---- ---
CDR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
t-- 7-1/16" Sk Flange x T' Due Box
Top of Annular
6.0 ft
dril 7 1116,
Top of Annular Element
6.7ft
Annular
Bottom Annular
8.0 ft
CL Blind/Shears
CL 2-3/8" Pipe/Slips
10.1 ft
B1 82 B3 B6 Choke Line
Kill Line
CL 2-3/8" x 3-1/2" VBRS 12.6 It l
CL 2.3/8"Pipe/Slips 13.4ft
CL of Top Swab 16.0 ft •
jt� Swab Test Pump Hose
oeT1 fT2
CL of Flow Cross� Master
CL of Master 78.8 k
LDS
IA
OA
LDS O
Ground Level
0
TRANSMITTAL LETTER CHECKLIST
WELL NAME: PB (-,L I t— 3-7-- A
PTD: gn� 1 Cl — O (21,
/Development —Service Explotatory _ Stratigraphic Test Non -Conventional
FIELD:d. POOL: PV' u
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50 -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
-� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
J
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
v
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015