Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-0737. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 01-37 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-073 50-029-23633-00-00 14275 Conductor Surface Intermediate Production Liner 8993 80 3751 10079 4308 13475 20" X 34" 10-3/4" 7" 4-1/2" 8762 48 - 128 47 - 3798 45 - 10124 9965 - 14273 48 - 128 47 - 3452 45 - 8653 8524 - 8993 none 770 2480 5410 7500 13475 , 13815 , 13895 2280 5210 7240 8430 12524 - 13945 4-1/2" 13Cr85 43 - 9976 8864 - 8876 Structural 4-1/2" HES TNT Perm , 9857 , 8436 No SSSV 9857 8436 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028328 43 - 8534 589 432 26228 16693 2872 3519 1781 1949 907 296 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.03.10 11:47:38 - 08'00' Bo York (1248) By Gavin Gluyas at 12:05 pm, Mar 10, 2025 RBDMS JSB 031325 DSR-3/11/25JJL 4/9/25 ACTIVITYDATE SUMMARY 2/8/2025 LRS CTU #1, 1.5" CT, 0.134" WT Job Scope: Drift, Set CIBP, Add Perf MIRU, Complete ***Weekly BOP Test*** ***Function Test Bop on Well***. MU GR/CCL logging BHA OAL (14.25') Max OD (3.60"). Freeze protect the flowline 42bbls 60/40. Load the tubing w/ 254bbls slick 1% KCL w/ Safelube. Drift to 12,639', hard tag in perfs, can't jet past. POOH. MU/RIH w/ YJOS Milling bha w/ 3.70" Parabolic mill OAL (22.38"). ***Continue on 2-09-25 WSR*** 2/9/2025 LRS CTU #1 1.5"CT 0.134" WT Job Scope: Drift, Set CIBP, Ad Perf Run #2: Cont. RIH w/ YJOS Milling bha w/ 3.70" Parabolic mill OAL (22.38'). Tag 12,639', begin milling @ 1.0 bpm pushing returns to formation. Hard milling for 2hrs, 5 stalls all at 12,634.8 - 12,635.5', broke through hard spot, reamed down/up across problem area. PU above all perfs and shut down for dry drift clean to 13601'. Pick back up and reciprocate the mill from 12620 - 12660'. Dry drift from 12610' to 12670' clean. POOH. BD YJOS Milling BHA. Run #3: MU MHA & PT. MU HES GR/CCL logging tool (OAL = 14.25'). RIH. Stop at 13,600' to begin logging to 9,700' (50 ft/min). Stopped to paint correlation flag at 13,450'. After logging to 9,700', POOH. At surface, breakdown GR/CCL logging BHA. Run #4: MU YJOS 4-1/2" Alpha Big Boy CIBP BHA & RIH. Set CIBP at 13475'MD. PUH, paint correlation flag, pooh. At surface BD setting tool recover 1/2" ball. ***Continue on 2-10-25 WSR*** 2/10/2025 LRS CTU #1, 1.5 CT, 0.134" WT. Job Scope: Drift, Set CIBP, Add Perf Run #5: MU HES 2-7/8"x24' Maxforce, 6 SPF, 6 0deg phasing perf guns. Perforate interval 12,524 - 12,548'. Pump 5 bbls 60/40, 15 bbls diesel in tubing. Total FP 25 bbls 60/40, 15 bbls diesel in tubing. RDMO and head to MPC-39. ***Job Complete*** Daily Report of Well Operations PBU 01-37 Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 2/8/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240208 Well API #PTD #Log Date Log Company Log Type BCU 09A 50133204450100 224113 11/13/2024 YELLOWJACKET GPT-PERF BCU 09A 50133204450100 224113 10/30/2024 YELLOWJACKET GPT BCU 11A 50133205210100 224123 11/9/2024 YELLOWJACKET SCBL BCU 25 50133206440000 214132 11/2/2024 YELLOWJACKET SCBL END 2-74 REVISED 50029237850000 224024 12/5/2024 HALLIBURTON MFC24 HVA 10 50231200280000 204186 11/13/2024 YELLOWJACKET GPT-PERF KU 23-07A 50133207300000 224126 11/23/2024 YELLOWJACKET SCBL NCIU A-21 50883201990000 224086 11/29/2024 AK E-LINE CaliperSurvey PAXTON 6 50133207070000 222054 11/7/2024 YELLOWJACKET PERF PBU 01-37 50029236330000 219073 11/23/2024 BAKER MRPM PBU 06-15A 50029204590200 224108 12/26/2024 BAKER MRPM PBU 06-19B 50029207910200 224095 12/10/2024 BAKER MRPM PBU 07-29E 50029217820500 213001 11/26/2024 BAKER SPN PBU 14-31A 50029209890100 224090 11/10/2024 BAKER MRPM PBU 14-41A 50029222900100 224076 11/9/2024 BAKER MRPM SRU 241-33B 50133206960000 221053 11/5/2024 YELLOWJACKET GPT-PERF Revision Explanation: Annotations added to processed log. Please include current contact information if different from above. T40053 T40053 T40054 T40055 T40056 T40057 T40058 T40059 T40060 T40061 T40062 T40063 T40064 T40065 T40066 T40067 PBU 01-37 50029236330000 219073 11/23/2024 BAKER MRPM Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.02.07 13:25:23 -09'00' Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 1/16/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240116 Well API #PTD #Log Date Log Company Log Type AOGCC ESet # BCU 09A 50133204450100 224113 10/26/2024 YELLOWJACKET SCBL BCU 12A 50133205300100 214070 8/21/2024 YELLOWJACKET GPT-PLUG-PERF BRU 233-23T 50283202000000 224088 12/28/2024 AK E-LINE PPROF BRU 233-27 50283100260000 163002 12/31/2024 AK E-LINE PPROF BRU 243-34 50283201240000 208079 12/27/2024 AK E-LINE PPROF GP 03-87 50733204370000 166052 12/25/2024 AK E-LINE CBL GP AN-17A 50733203110100 213049 12/16/2024 AK E-LINE CBL GP AN-17A 50733203110100 213049 12/21/2024 AK E-LINE Perf GP BR-03-87 50733204370000 166052 1/3/2025 AK E-LINE CBL IRU 44-36 50283200890000 193022 1/3/2024 AK E-LINE Depth Determination/Plug IRU 44-36 50283200890000 193022 12/26/2024 AK E-LINE DepthDetermination KU 31-07X 50133204950000 200148 12/3/2024 AK E-LINE Perf MPU B-21 50029215350000 186023 1/4/2025 AK E-LINE PlugSettingRecord MPU H-08B 50029228080200 201047 12/28/2024 AK E-LINE Welltech MRU G-01RD 50733200370100 191139 12/12/2024 AK E-LINE IPROF MRU G-01RD 50733200370100 191139 12/18/2024 AK E-LINE Perf MRU M-25 50733203910000 187086 12/3/2024 AK E-LINE Perf MRU M-25 50733203910000 187086 12/19/2024 AK E-LINE Perf PBU 01-37 50029236330000 219073 11/23/2024 HALLIBURTON PPROF PBU 06-05 50029202980000 178020 12/21/2024 HALLIBURTON RBT PBU 06-19B 50029207910200 224095 12/11/2024 HALLIBURTON RBT PBU 11-38A 50029227230100 198216 11/27/2024 HALLIBURTON TEMP PBU 14-31A 50029209890100 224090 11/11/2024 HALLIBURTON RBT PBU L-103 50029231010000 202139 11/25/2024 HALLIBURTON IPROF PBU M-207 50029238070000 224141 12/25/2024 HALLIBURTON RBT PBU P2-55 50029222830000 192082 12/5/2024 HALLIBURTON PPROF PBU S-15 50029211130000 184071 11/18/2024 HALLIBURTON RBT TBU M-25 50733203910000 187086 12/13/2024 AK E-LINE Perf T39958 T39959 T39960 T39961 T39962 T39963 T39964 T39964 T39965 T39966 T39966 T39967 T39968 T39969 T39970 T39970 T39971 T39971 T39972 T39973 T39974 T39975 T39976 T39977 T39978 T39979 T39980 T39981 PBU 01-37 50029236330000 219073 11/23/2024 HALLIBURTON PPROF Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.01.16 13:56:40 -09'00' Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:219-073 6.50-029-23633-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14275 13815 9931 9857 None 13815, 13895 8435 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" X 34" 48 - 128 48 - 128 2280 770 Surface 3751 10-3/4" 47 - 3798 47 - 3452 5210 2480 Intermediate 10079 7" 45 - 10124 45 - 8653 7240 5410 Production Perforation Depth: Measured depth: 12560 - 13945 feet True vertical depth:8858 - 8876 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 43 - 9976 9857 8435Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 4308 4-1/2" 9965 - 14273 8524 - 8992 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 86811251941344 247210777 1100 16083 961 809 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork david.bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907)564-4672 Treatment descriptions including volumes used and final pressure: 13. Sr Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8993 Sundry Number or N/A if C.O. Exempt: 321-147 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … CTU Extended Perforating Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028328 & 0028329 PBU 01-37 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 1:03 pm, Jun 24, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.06.23 17:47:50 -08'00' Bo York SFD 6/24/2021DSR-6/24/21 RBDMS HEW 6/29/2021MGR30JUL2021 ACTIVITYDATE SUMMARY 6/6/2021 CTU #9, 1.75" CT - 33.6bbl, Job Objective: Extended Addperf. MIRU. ...In Progress... 6/7/2021 CTU #9, 1.75" CT - 33.6bbl, Job Objective: Extended Addperf RIH with Read Cased Hole memory GR/CCL, 2.375" carrier and 3.5" JSN. Tag CIBP at 13,795'ctm. Log correlation up to 10,400' panting white tie-in flag at 12,500'. Kill well with 1% KCL w/ SafeLube and POOH maintaining MCHF. Confirm +30' correction. Make up 2-7/8" Powerjet Omega perf guns, 6 spf and RIH. Perforate 12,560' - 12,580' and 12,647 - 12,657'. POOH keeping hole full. Begin to openhole undeploy guns. ...In Progress... 6/8/2021 CTU #9, 1.75" CT - 33.6bbl, Job Objective: Extended Addperf. Finish undeploying extended perforating string. RDMO. ***Complete. Well shut in and freeze protected on departure.*** Daily Report of Well Operations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y Samantha Carlisle at 2:55 pm, Mar 25, 2021 321-147 DSR 3/30/21  SFD 4/8/2021 10-404 MGR26MAY21 <HVQ5HTXLUHG" &RPP 4/8/21 dts 4/8/2021 JLC 4/8/2021 RBDMS HEW 4/8/2021 Add Perf Procedure 01-37 PTD:219-073 Well Name:01-37 Add Perf API Number:50-029-23633-00 Current Status:On-line Rig:CTU Estimated Start Date:04/08/2021 Estimated Duration:2days Regulatory Contact:Carrie Janowski Permit to Drill Number:219-073 First Call Engineer:David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number:212-00333 IOR 40 Current Bottom Hole Pressure:3,278 psi @ 8,800’ TVD 7.2 PPGE | Maximum Expected BHP:3300 psi @ 8,800’ TVD 7.3 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2420psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 634 psi (Taken on 4/26/20 service coil) Min ID:3.725” ID – XN profile @ 9,960’MD Max Angle:99 Deg @ 12,530’ Reference Log: MWD GR-CCL - Log Dated 20-Sept-2019 Brief Well Summary: 01-37 is rotary grass roots well completed in Z4A in Sept 2019. Objective: The objective of this procedure is to add Z4b and Z4a perfs in the midpoint of the lateral. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 210 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 209 bbls b. 4-1/2” Tubing - 13780’ X .0152bpf = 209 bbls 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Run past 12800’ctmd and log OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. 6. At surface, prepare for deployment of TCP guns. 7. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 8.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety * add Z4b and Z4a perfs in the midpoint of the lateral. *See note above regarding kill methods if pressure observed at surface after perforating. MU Lubricator. Standing orders flow chart included with this sundry request. 12560 - 12580 New perfs 12,560- 12,580 - (proposed) Date: 6/8/2020 Transmittal Number: 93769 BPXA WELL DATA TRANSMITTAL Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 The digital zip file for the well log package listed below is being provided to you via SharePoint. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com. SW Name Log Date Company Description Format 01-37 4/2/2020 Halliburton RBT/SCMT Zip File Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com Thank you, Mer Merion Kendall SIM Specialist ----------------------------------------------------------------------------------------------- BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK ----------------------------------------------------------------------------------------------- AOGCC https://bp365.sharepoint.com/sites/BPtoAOGCCElectronicPermittingandReporting/ Received by the AOGCC 06/08/2020 Received and signed by Abby Bell on 06/08/2020 PTD: 2190730 E-Set: 33331 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:219-073 6.50-029-23633-00-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14275 13815 8831 9857 None 13815, 13895 8436 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" X 34" 48 - 128 48 - 128 2280 770 Surface 3751 10-3/4" 47 - 3798 47 - 3452 Intermediate 10079 7" 45 - 10124 45 - 8652 7240 5410 Production Perforation Depth: Measured depth: 13780 - 13945 feet True vertical depth:8821 - 8876 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 43 - 9976 43 - 8534 9857 8436Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 4308 4-1/2" 9965 - 14273 8524 - 8992 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 25403818159 10241489 0 0 869 231 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Maharaj, Sanjeev Sanjeev.Maharaj@bp.com Authorized Name:Maharaj, Sanjeev Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075645644 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8993 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Set CIBP Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028329 & 028328 PBU 01-37 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Digitally signed by Sanjeev Maharaj Date: 2020.05.05 09:32:12 -08'00' By Samantha Carlisle at 3:37 pm, May 05, 2020 SFD 5/7/2020DSR-5/6/2020 RBDMS HEW 5/6/2020 MGR098JUN2020 ACTIVITYDATE SUMMARY 3/31/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf MIRU CTU. Stand by for scaffolding. Stand by for area activity clarification/plan forward. ***In Progress*** 4/1/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf Continue standby for area activity clarification. MU/RIH with 3.70" DJN drift for log/CIBP/Perf. Load well with 203bbl safelube, 7bbl FP cap. ***In progress*** 4/2/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf Continue RIH w/ 3.70 DJN nozzle. Tag 14160' CTM/14215mech. Weight back at 14153', pu 33' off bottom for safety flag. Paint white/blue safety flag at 14130'. POOH. Make up and RIH with HES memory cement bond log BHA, OAL: 26.57'. Load an kill well with 1% KCl. Log main pass from 14110 to 10150. Repeat pass from 13900 to 13350. MU/RIH with 4.5" BOT CIBP. ***In progress*** 4/3/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf Correct to ME at the red flag. Set BOT 1AA CIBP at 13895'. 6 bbl FP cap. POOH. Hand well over to LRS testers to flow/test (12hr). ***In progress*** 4/4/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf Continue standby for 12hr well test. Finish well test at 11 am. MU & RIH w/ 20' x 2- 7/8" PJO guns. Pump 135 bbls slick 1% KCL w/ Safelube down backside, 5 bbl 60/40 cap. Perforate 13780-13800. PU, paint yellow flag at 13500' for subsequent plug/perf runs. New corrected EOP= 13500-26.89=13473.11'. POOH, pump 40bbl safelube for chrome drag + FP cap. POOH. Hand well over to LRS testers for flowback/well test. ***In progress*** 4/5/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf Standby for well test post perf. Finish 12hr test. Hand well back over to coil for CIBP. ***In progress*** 4/6/2020 CTU#9 1.75" CT. Job Scope: Drift, RBT, Contingent plug & perf FP LRS surface lines. MU/RIH BOT 1AA 4.5" CIBP. Set CIBP at 13815. Freeze protect well with 38bbl of 60/40. DSO notified of well status. RDMO. ***Job Complete*** Daily Report of Well Operations PBU 01-37 DATA SUBMITTAL COMPLIANCE REPORT 1114!2020 Permit to Drill 2190730 Well Name/No. PRUDHOE BAY UNIT 01-37 MD 14275 TVD 8993 Completion Date 10/9/2019 REQUIRED INFORMATION Mud Log Nov� Operator BP Exploration (Alaska) Inc. Completion Status 1-011- Samples -OIL Samples No ✓ DATA INFORMATION List of Logs Obtained: MWD/GR/RES, MWDIGRIRESIDENINEU, GRICCLIRPM Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data ED C 31460 Digital Data Current Status 1 -OIL API No. 50-029-23533-00-00 UIC No Directional Survey Yes (from Master Well Data/Logs) Interval OH/ Start Stop CH Received Comments _ 63 v 14275 11/20/2019 Electronic Data Set, Filename: 01- 37 BHGE_LTK MEM_Composite_Drilling Depth Data.las 11/20/2019 Electronic File: 01- 37_BHGE_LTK_2MD_Memory Drilling Log.cgm 11/20/2019 Electronic File: 01- 37_BHGE_LTK 2TVDSS_Memory Drilling Log.cgm 11/20/2019 Electronic File: 01- 37_BHGE_LTK 5MD_Memory Drilling Log.cgm 11/20/2019 Electronic File: 01- 37_BHGE_LTK 5TVDSS_Memory Drilling Log.cgm 11/20/2019 Electronic File: 01- 37_BHGE_LTK_Composite_Drilling Depth Data.dls 11/20/2019 Electronic File: 01- 37_BHGE_LTK_2MD_Memory Drilling Log.pdf 11/20/2019 Electronic File: 01- 37_BHGE_LTK_2TVDSS_Memory Drilling Log.pdf 11/20/2019 Electronic File: 01- 37_BHGE_LTK_5MD_Memory Drilling Log.pdf 11/20/2019 Electronic File: 01- 37_BHGE_LTK 5TVDSS_Memory Drilling Log.pdf 11/20/2019 Electronic File: 01-37_BHGE_Final Surveys.csv AOGCC Page 1 of 3 Tuesday, January 14, 2020 DATA SUBMITTAL COMPLIANCE REPORT 1/14/2020 Permit to Drill 2190730 Well Name/No. PRUDHOE BAY UNIT 01-37 Operator BP Exploration (Alaska) Inc. API No. 50-029-23633-00-00 MD 14275 TVD 8993 Completion pate 101912019 Completion Status 1-0I1- Current Status 1-0I1- UIC Na 11/20/2019 Electronic File: 01-37_BHGE_Final Sunreys.pd j ED C 31460 Digital Data 11/20/2019 Electronic File: 01-37_BHGE_Final Surveys.txt ED C 31460 Digital Data 0 0 2190730 PRUDHOE BAY UNIT 01-37 LOG Log 31460 Log Header Scans HEADERS 9794 14194 11/25/2019 Electronic Data Set, Filename: 1- ED C 31499 Digital Data 37_MRPM_PNC3D_RAW_PASS01 UP_70CT201 9_BHl.las 10344 10621 11/25/2019 Electronic Data Set, Filename: 1- ED C 31499 Digital Data 37_MRPM_PNC3D_RAW_PASS02UP_7OCT201 9_BH I.las 11/25/2019 Electronic File: 1- ED C 31499 Digital Data 37_MRPM PNC3D_RAW_PASS0IUP_70CT201 9 BHI.dlis 11/25/2019 Electronic File: 1- ED C 31499 Digital Data 37_MRPM_PNC3D_RAW_PASS02UP 7OCT201 9 BHl.dlis 11/25/2019 Electronic File: ED C 31499 Digital Data BPi37_MRPM_PNC3D_07 0CT_2019_BHI.m _ eta_ 11125/2019 Electronic File: C 31499 Digital Data BP1_37_MRPM_PNC3D_07 OCT_2019_BHI.m �El) eta._ PDF 0 0 2190730 PRUDHOE BAY UNIT 01-37 LOG Lay 31499 Log Header Scans HEADERS Well Cores/Samples Information: Sample Interval Set Start Stop Sent Received Number Comments Name INFORMATION RECEIVED Completion Report 0 Directional 1 Inclination Data Mud Logs, Image Files, Digital Data Y l� Core Chips Y Production Test Informatio1 NA Mechanical Integrity Test Information Y 1 NA Composite Logs, Image, Data Files Core Photographs Y A Geologic Markers/Tops S Daily Operations Summary 0 Cuttings Samples pfl l./ Laboratory Analyses Y 1 AOGCC Page 2 of 3 Tuesday, January 14, 2020 DATA SUBMITTAL COMPLIANCE REPORT 1114/2020 Permit to Drill 2190730 Well Name/No. PRUDHOE BAY UNIT 01-37 MD 14275 TVD 8993 COMPLIANCE HISTORY Completion Date: 1019!2019 Release Date: 5/21/2019 Description Comments: Completion Date 10/9/2019 Date Operator BP Exploration (Alaska) Inc. Completion Status 1-0IL Current Status 1 -OIL Comments API No. 50-029-23633-00-00 UIC No '11q /2-0 2_DCompliance Reviewed By: Date: AOGCC Page 3 of 3 Tuesday, January 14, 2020 Baker Hughes PRINT DISTRIBUTION COMPANY BP Exploration Alaska Inc. WELL NAME 01-37 FIELD Prudhoe Bay Unit LIST 219073 31499 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com to acknowledge receipt of this data. COUNTY North Slope LOG TYPE BHI DISTRICT Alaska RPM:PNC3D LOG DATE October 7, 2019 AUTHORIZED BY Dirk Zei'lemaker EMAIL Dirk.zeiilemakerAbakerhughes.com TODAYS DATE November 21, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: -- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION BP North Slope_ EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 LD I FINAL CDIDVD FINAL SURVEY REPORT ELIM EOO LOGS (las, dlis, PDF, META, 6.I BP Exploration (Alaska) Inc. OGS COM, Final Surveys) (Compass) Anchorage, Alaska 99508 PRINTS Attn: David Itter # OF COPIE # OF COPIES # OF COPIES 4 4 4 4 4 2 ConocoPhillips Alaska Inc. 1 Attn. Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99501 3 ExxonMobil, Alaska 'Attn: Lynda M. Yaskell andlor Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4 SIaiC 131 :%la4ka - A0(,'C — : 1 Attn: Natural Resources Technician R 333 W. 7th Ave, Suite 100 \nchnrage, Ala�ka 995111 5 DNR - Division of Oil & Gas *`'x Attn: Garret Brown V 2 C �y West 7th Avenue, Suite 1100 J Z019 550 O[ Anchorage, Alaska 99501 C 6.I BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 1900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter 0 TOTALS FOR THIS PAGE: 0 1 4 0 0 Baker Hughes Eil PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc - WELL NAME 01-37 FIELD Prudhoe Bay Unit 219073 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or data. COUNTY PRUDHOE BAY LOG TYPE GR RES-DEN-NEU BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares bakerhu hes.com STATUS COMPANY LOG DATE September 21, 2019 TODAYS DATE November 19, 2019 Revision Final Replacement: No Details: Rev. Requested by: -- ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V i BP North Slope. :EGA. PBOC, PRB-20 (Office 109) :D&C Wells Project Aides E Attn: Bends Glassmalcer & Peggy O'Neil .900 E. Benson Blvd. :Anchorage, Alaska 99508 ---------------------------------- 2 I ConocoPhillips Alaska loc. 4 :Attn: Ricky Elgarico :ATO 3-344 :700 G Street ;Anchorage AK 9951D ............. ---------------- ---------- ......... .......... 31460 FIELD I FINAL CD/DVD FINAL SURVEY REPORT PRELIM LOGS LOGS (las, dlis, PDF, META, I CGM, Final Surveys) (Compass} # OF PRINTS # OF COPIES # OF COPIES # OF COPIES ---------------------------------- - ------------------ 3 :ExxonMobil, Alaska Atta: Lynda M. Vaskell and/or Lisa Boggs :3201 C Street, Suite 505 Anchora¢e. AK 99503 ....................................----............... 4: state of Alaska - AOGCC :Attu: Natural Resources Technitian :333 W. 7th Ave, Suite 100 :Anchorage, Alaska 99501 - -------------- 5:DNR- Division of Oil & Gas *** :Attn: Remour a Evaluation Section :550 West 7th Avenue, Suite 1100 :Anchorage, Alaska 99501 *** Sk"confidential" on all material deliver to DNR --------------.-- --------- ----- -------- ----------------------------------------------------------- 6?BP Exploration (Alaska) Inc. : Petrotechnical Data Center, LR2-1 :900 E. Benson Blvd. :Anchorage, Alaska 99508 Attn: Nancy Land! -- TOTALS FOR THiS PAGE: M 0 NA 2 0 2019 0 0 4 0 °OGCC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL MPLETION OR RECOMPLETION REPO( %ND LOG la. Well Status: Oil m Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25,105 20AAC 25.110 Development IZ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Service ❑ Slratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Aband.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 10/9/2019 279-073 - 3. Address: 7. Date Spudded: 15. API Number. P.O. Box 196812 Anchorage, AK 99519-6812 9/5/2019 50-029-23633-00-08 ' 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 9/19/2019 PBU 01-37 9 Ref Elevations KB 88,50 17. Field/Pool(s): Surface: 4793' FSL, 3869 FEL, Sec. 08, TI ON, RISE, UM • Top of Productive Interval: 2418' FNL, 463FWL, Sec. 09, T10N, R15E, UM GL 39.50 ' BF 41.29 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MDfrVD): 18. Property Designation: Total Depth: 247' FNL, 359W FWL, Sec. 09, TI ON, RISE, UM ' 11081'18960' ADL 028329 & 028328 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MDITVD): 19. DNR Approval Number: Surface: x- 698736 ' y- 5940437 - Zone - ASP 4 14275'18993' • 79-179 12. SSSV Depth (MDITVD): 20. Thickness of Permafrost MDfrVD: TPI: x- 703123 y- 5938622 Zone - ASP 4 Total Depth: x- 705192 y- 5940877 Zone - ASP 4 None 2008'11975' 5. Directional Or Inclination Survey: Yes JZ (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MDITVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) NIA 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation recordi� Acronyms may be used. Attach a separate page if necessary V eIE r MWD I OR I RES, MWD I OR I RES, MMI OR 1 RES I DEN I NEU, OR I CCL I RPM Nov 0 5 2019 23. CASING, LINER AND CEMENTING RECORD CASING Wr. PERGRADE FT. SETTING DEPTH MD SETTING DEPTH TVD SIZE CEMENTING RECORD '74MOLE UNT LED TOP BOTTOM TOP BOTTOM 20" x 34" 21.5# M53 48' 128' 46' 128' 42" 20 yds Concrete 10-314" 45.5# L-80 47' 3798' 47' 3452' 13-112" 1818 ax LiteCrete, 25B sx Class'G' 7" 26# L sc 45' 10124' 45' 8653' 9-718" 725 sx LiteCrete, 139 sx Class'G' 4-112" 12.6# 13Cre5 9965' 14273' 8524' 8992' 6-118" 494 sx Class'G' 24. Open to production or injection? Yes ® ' No ❑ 25. TUBING RECORD GRADE DEPTH SET (MD) PACKER SET (MDfrV If Yes, list each interval open (MDITVD of Top and Bottom; Perforation Size and Number; Date Perfd): 4-112" 12.6# 13Cr85 9976' 9857'/ 8436' 2-112" Gun Diameter, 6 spf I OAVI9 & 1019119 13828'- 13848' 8836 - 8843' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13864'- 13884' 8848'- 8855' Was hydraulic frecturing used during completion? Yes ❑ No R1 Per 20 AAC 25.283 (i)(2) attach electronic and printed information 13906'- 13915' 8862'- 8866' COMPLETION 13931'- 13945' 8871'- 8876' DAT FE (�JZM DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED VERIFIED 2100' Freeze Protect w/ 75 Bbls Diesel P7. PRODUCTION TEST Dale First Production: October 11, 2019 Method of Operation (Flowing, gas lit. etc.): Flowing Date of Test: 10/12/19 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 11 Test Period ­► 407 1529 1669 B3 3753 Flow Tubing 0 Press Casing Press: 1450 Calculated 24 Hour Rate -1. Oil -Bbl: 889 Gas -MCF: 3336 Water -Bbl: 3641 Oil Gravity - API (corr): WA Forth 10407 Revised 512017 CONTINUED ON PAGE 2 Submit ORIGINAL only %f/I ok",*xww N NOV 0 8 2019 tx• t7. r99 ,, 28. CORE DATA Conventional Core(s) Yes ❑ No 0 Sidewall Cores Yes No If Yes to either question, list formations and intervaw cored (MD+TVD of top and bottom of each), and summarize -oology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, cone chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top 42' 42' Well Tested? Yes ❑ No Permafrost - Base 2050' 2018' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 Top of Productive Interval 10241' 8742' AAC 25.071. Ugnu 5440' 4786' West Sak 7200' 8235' Colville Mudstone 7797' 6726' HRZ 9760' 8357' LCU 9956' 8517' Sag River 10104' 8637' Shublik 10147' 8671' Sadlerochit - Zone 4 10241' 8742' CGL - Zane 3 10570' 8929' Base of CGL - Zone 2 10750' 8993' Zane 3 (invert) 11550' 8983' Zone 4 12059' 8922' Zone 3 (Revert) 13903' 8861' Zone 2 14050' 8913' Formation at total depth: Zone 2 14050' 8919' 31. List of Attachments: LOT I FIT Summary, Summary of Daily Drilling Reports, Summary of Post -Rig Work, Surrey, Cement Report, As -Built, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Nocas, Noel Authorized Title: Si S cialist Contact Email: Noel.Nocas@bp.00m Authorized Signature: Date: �t % f Contact Phone: +19075645027 INSTRUCTIONS General: This forth is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 114 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requiremerrts of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 25. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 512017 Submit ORIGINAL Only TREE = GE TVD WELLHEAD-= VLV ANGLE AT TOP PERF: 71' @ 13828' ACTUATOR= GE MACHS ' Spm OKB. E LEV = INTERVAL NS z BF. ELEV = SQZ 20' X 34' NSUL KOP = 13828 -13848 CONDUCTOR, Max le =99° 12503'' 2-12" Dalian MD = 10479" 215.5#,A-53, Datxan TVD = 8800' SS D =1925' [10-&4" CSG, 45.5#, L-80 VAM 21,07 = 9.950 3798' ESTIMATED TDP OF CEMENT (09121119) 4900' Minimum ID = 3.725" @ 996W 4-112" HES XN NIPPLE TOP OF 4-1/2' LNR 9965° 4-112" TBG, 12.6#,13CR-05 VAM TOP, 9976' _0152 bpf, ID = 3.958' 7" CSG, 2E9, L-80 VARA TOP HC, ID x.276" 10124' . 01=37SAFFTY MAS ,..S 01 8S ' � 0267'. CHROME TBG& LNR PBTD 14 4-12' LNR, 12.8#, 13CR-05 VAM TOP, `L 14273' .0152 bpf, ID = 3.958' = REV BY COMMENTS 2LM_l REV BY 19 P.272 INITIALWELLBORE 10116!19 KP/JMD 10/10119NWJMD FNALODEAPPR( 10/10/19 IJTWJMDIPERFS 10/16/19 IJNUJMDIADDED OKB & BF 2021' I-14-12" HES X NIP, ID = 3-813- rraaaunoCI c ST PERFORATION SUMMARY TVD REF LOG_ ON 1 ! VLV ANGLE AT TOP PERF: 71' @ 13828' PORT Note: Refer to Production DB for tiislorical addata Spm SPF INTERVAL NS z SHOT SQZ 2-12" 6 13828 -13848 O 10108/19 34 2-12" 6 13864 -13884 O 10!08119 7540 2-12" 6 13905 -13915 O 10109M 9 0922!19: 2-12' 6 13931 -13945 O 10/09/19 PBTD 14 4-12' LNR, 12.8#, 13CR-05 VAM TOP, `L 14273' .0152 bpf, ID = 3.958' = REV BY COMMENTS 2LM_l REV BY 19 P.272 INITIALWELLBORE 10116!19 KP/JMD 10/10119NWJMD FNALODEAPPR( 10/10/19 IJTWJMDIPERFS 10/16/19 IJNUJMDIADDED OKB & BF 2021' I-14-12" HES X NIP, ID = 3-813- rraaaunoCI c ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 4122 3715 36 KGB -2 DOME BK 16 09130119 5 6186 5400 34 BK 20 09/30119. 4 7540 6515 35 SK 0 0922!19: 3 8151 7018 34 UBK 0 0922119 2 6725 7494 34 BK 0 0922119 1 9754 8352 36 BK 0 0982119. 982$' 4-12' HE5 X NIP, ID = 3.813' 9857' 7- X 4-12' HES TNT PKR lD= 3.856' 9B91' —j4-112" HES X NIP, ID =3.813' 9960' 1--�4-112' HES XN MP, ID = 3.725' 9965' 7" X 5' WFD LTP wfTIEBACK SLEEVE & VVFD HGR, D =4.29" 9976'4-12' WLEG, ID = 3.95W 9985' 5"X 4-12' XO, ID = 3.930" COMMENTS PRUDHOE BAY UNIT TREE NFO VYELL: 51-37 CONDUCTOR INFORMATION PERMIT No: 219-073 API No: 50-029623633-00 SEC 08, Ti ON. R15E, 4646' FSL & 3840' BP Exploration (Alaska) Page 1 of 1 Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project: PBU Rig Name/No.: PARKER 272 Operation summary Report 1 Start Data: 9/3/2019 Site: 01 I Soud DateRme: 9/5/2019 Rig Contractor: PARKER DRILLING CO. -- Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Date From - To 9/3/2019 123:00 - 00:00 9/4/2019 100:00 - 02:00 02:00 03:00 103:00 04:30 04:30 - 06:00 7-- 06:00 07:00 -- 09:00 Hrs i Task 1.00 MOB 2.00 1.00 End Date: 912 012 01 9 2:00:00AM AFE No HS4DW0019FK-EX-DI-DN- (7,293,574,00) i I Rig Release: 912212019 BPUOI: USA00008556 I Code NPT I Total Depth 1 Phase j Description of Operations P 1 -0.2 PRE RIG DOWN AND MOVE OFF OF 02-02 I COMPLETE RIG RELEASE VERIFICATION I CHECKLIST FOR 02-02 AT 23: 00 HRS HOLD PRE -RIG MOVE MEETING WITH SECURITY AT 23:15 HRS _ RIG OFF DS -02 AT 23:59 HRS — — —i—�-- MOB P -0.2 PRE MOVE ALL THREE MODULES FROM DS -02 MOB 1.50 MOB 1.50 MOB I 07:00 1.00—MOB 09:00 2.00 MOB 11:00 1 2.00 1 MO B ALONG WEST DOCK ROAD TOWARDS DS -01. AT THE INTERSECTION OF WEST DOCK ROAD AND EAST CHECKPOINT ACCESS ROAD AT 02:00 H RS P _ t -0.2 PRE T !MOVE ALL THREE MODULES ALONG EAST ' CHECK POINT ACCESS ROAD AND ONTO I DS -01. j -ALL THREE MODULES ON DS -01 AT 03:00 p� -0.2� PRE I SPOT DRILL MODULE OVER DUMMY WELL HOUSE. _ _ _ SPOT UTILITY MODULE AND MUD MODULE ..P 0.2 PRE f GENERAL RIG UP OPERATIONS RIG UP LINES IN INNER CONNECTS PLUG IN ELETRICAL CONNECTIONS IN INNER CONNECTS P 1 0.2 PRE I RAISE MASTAND SKID RIG FLOOR TO DRILL POSITION - MAX WEIGHT OFF HEADACHE RACK= 515 P -0.2 PRE I RIG UP LINES AND PREPARE RIG TO TAKE ON I FLUIDS MAKE UPALL CIRCULATING LINES - RIG UP DRILL MODULE AND MUD MODULE COMPLETE RIG ACCEPT CHECKLIST: 1 ACCEPT RIG AT 09:00 HRS _ _ 0.2 PRE PRE I TAKE ON FLUIDS TO PITS AND CONTINUE TO P RIG UP I- BEGIN OFFLOADING 8.6 PPG MAXDRIL-N TO j PITS SIMOPS: 1 BRIDLE DOWN AND SECURE LINES IN DERRICK I - CALIBRATE BLOCKS 1 NIPPLE UP DIVERTER SYSTEM — — -- Printed 11/4/2019 2:20:52PM **All depths reported in Drillers Depths" Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project: PBU Rig Name/No.: PARKER 272 tiE�CaIlk SP Operation Summary Report Start Date: 9/3/2019 I Ena Uare: arzurcu+o i Site: 01 Spud DaWriMe: 9/5/2019 Rig Contractor: PARKER DRILLING CO. — — -- Active datum: ACTUAL KB P272 @88.5ft (above Mean Sea Levu Date From - To ` Hrs I (hq _ 111:00 - 16:30 1 5.50 '16:30 ` 18:31 18:30 - 20:3' 20:30 - 21:C fi - �21= 21:30 122:00 23:00 9/512019 00:00 100:30 02:30 22:1 23:1 00: 00 02 - 03:00 0.50 MOB I Task Code NPT II TotalDepthPhase AFE No {H-S4DW0019FK-EX-DI-DN- (7,293,574.00) Rig Release: 9122/2019 BPUOI: USA00006556 Description of Operations —�-0.2 —rt PNIPPLE PPLE UP DIVERTER SYSTEM MOB P NIPPLE UP DIVERTER AND KNIFE VALVE ON RISERS NIPPLE UP LOW PRESSURE RISERS AND FLOW BOX �- INSTALL FLOW LINE AND HOLE FILL LINES INSTALL 4" VAVLES ON CONDUCTOR $IMOPS: 1- CALIBRATE PITS WITH QUADCO REP I - CONTINUE TAKING ON MAXDRIL-N TO PITS I - CONTINUE TO RIG UP RIG FLOOR EQUIPMENT i - PERFORM STOP THE JOB DRILL AN D AAR II WHILE LIFTING DIVERTER ANNULAR (INSUFFICIENT RIGGING) j CONTINUE TAKING ON MAXDRIL-N TO PITS I SIMOPS: BUILD 7 STANDS OF 5" HWDP WITH OFF-LINE STAND BUILDING EQUIPMENT -TEST FIRE AND _GAS ALARMS MOBILZE ALL SMALL PIECES OF BHA #1 TO RIG FLOOR AND VERIFY BHA#1 COMPONENTS IN PIPE SHED SIMOPS: �- LOCKED OUT WELLS 01-09A, 01-11 AND 103-16 PRIOR TO SPUD _ — ---- PERFORM DIVERTER FUNCTION TEST AND j KOOMY TEST - KNIFE VALVE OPENED AT 15 SEC, ANNULAR CLOS_ED_AT 33 SEC_ --. - — CONDUCT DIVERTER DRILL/ RIG EVACUATION DRILL AND _AAR _-- — 4 —.—, HOLD PRE -SPUD MEETING WITH YEAROUT'S CREW______--.— —— I RIG UP SLICK LINE AND GYRO DATA AND STAND BACK - PICK UP AND HANG SLICK LINE SHEAVES IN DERRICK -MAKEUP GYROAND STAND BACK --4— -- FILLALL LINES AND WELLAND CHECK FOR LEAKS I- PRESSURE TEST SURFACE LINES TO 350D PSI SIMOPS: 1 - HOLD PRE -SPUD MEETING WITH WOOD'S CREW— CONDUCT DIVERTER DRILL/ RIG EVACUATION DRILLAND AAR WITH WOOD'S CREW --_—-- PICK UP AND MAKE UP BHA #11, 13-112" DRILLING ASSEMBLY WITH 1.8' AKO MOTOR 1- VERIFY AKO ON MOTOR AND SCRIBE MOTOR AND ONTRAK PLUG IN AND VERIFY ONTRAK MAKE UP 13-112" BAKER VM3 BIT + — — -r ----I--- --- ------ -0.2 PRE I SERVICE RIG FLOOR EQUIPMENT Printed 11/4/2019 2:20:52PM "'AII depths reported in Drillers Depths`* Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project: PBU Rig Name/No.: PARKER 272 Operation Summary Replort --------- --- ;AFENo 1 Start Date: 9/3/21719 Site: 01 Spud Date/Time: Rig Contradm: PARKER DRILLING CO. — _— -- _ Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Date I End Dale: 9!20!2019 From - To ! Hra Task I Code ` NPT Total Depth hr) (ft) — ^80.9 I (7,293,574.00) Rig Release: 9/22/2019 BPUOI: USA00006556 Phase Description of Operations SURF 1 SPUD WELLAND DRILL 13-112" SURFACE HOLE FROM 147' MO TO 281' MD - CLEAN OUT TO BASE OF CONDUCTOR, 147' 'MD !I - 550 GPM, 840 PSI ON BOTTOM, 794 PSI OFF BOTTOM - 40 RPM, 1 KFT-LBS TORQUE ON BOTTOM, 1 !KFT-LBS TORQUE OFF BOTTOM, 10 KLBS IWOB - PU 60 KLBS, SO 60 KLBS, ROT 60 KLBS �- MUD WEIGHT INIOUT = e.6 PPG V TAKE GYRO SHOTS AT 50' AND 127' (BASE OF ,CONDUCTOR) DRILL DOWN 2 STANDS OF HEAVY WEIGHT THEN RACK BACKAND PICKUP FLEX _ !COLLARS_ ---._-- 280.9 I SURF I CHANGE OUT HYDRAULIC MOTOR ON TOPDRIVE BOLTS WERE DAMAGED DUE TO JARRING I ON PREVIOUS WELL (02-02 P&A) i 1- PREFORM VISUAL INSPECTION OF TOP .DRIVE - REMOVE AND REPLACE WITH USED MOTOR I AND NEW BOLTS i - NON -CODE BRIG REPAIR_ 363.9 SURF DRILL 13-112° SURFACE HOLE FROM 281' MD �I TO 364'M D, 364' TVD. - 550 GPM, 931 PSI ON BOTTOM, 888 PSI OFF i BOTTOM - 40 RPM, 2 KFT-LBS TORQUE ON BOTTOM, ' KFT-LBS TORQUE OFF BOTTOM, 10 KLBS iWOB - PU 61 KLBS, SO 61 KLBS, ROT 61 KLBS I - WASH 30 FT PRIOR TO GYRO, TAKE GYRO SHOTS AT 165', 263' !-MUD WEIGHT INIOUT = 8.7 PPG_ 921.9 SURF DRILL 13-112" SURFACE HOLE FROM 364' MD TO 922' MD, 922' TVD - 550 GPM, 1240 PSI ON BOTTOM, 1045 PSI OFF BOTTOM - 40 RPM, 3-9 KFT-LBS TORQUE ON BOTTOM, 1 KFT-LBS TORQUE OFF BOTTOM, 22 KLBS WOB PU 80 KLBS, SO 80 KLBS, ROT 80 KLBS - TAKE MWD SURVEYS EVERY -94' MD: NO SURVEYS PASS QC CONTINUE TO TAKE GYRO SURVEYS AS REQUIRED - WASH 30 FT PRIOR TO GYRO - MUD WEIGHT INIOUT = 8.7 PPG Printed 11/4/2019 2:20:52PM **AII depths repORed in Drillers Depths"* Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project: PBC -- Rio Name/No.: PARKER 272 opergton $urnmw Deport -------- _------ AFE No I Start Date: 9/3/2019 Site: 01 Spud Datelfime. Rig Contractor. PARKER DRILLING CO.— Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea LeveD Date From - To 18:00 - 00:00 Hrs Task Code (hr) 6.00 DRILL P 91612o19 j 00:00 - 12:00 12.00 'I l � 12:00 - 15:00 I 3.00 15:00 16:30 DRILL P I I I DRILL P NPT End Date: 9/201201a 9FK-EX-DI-DN- (7,293.574.00) Rig Release: 9/22/2019 BPUOI: USA00006556 Total Depth I Phase ` Description of Operations 1,329.9 T URF ? DRILL 13112" SURFACE HOLE FROM 922' MD TO 1330' MD, 1321' TVD - 550 GPM, 1330 PSI ON BOTTOM, 1080 PSI OFF BOTTOM, - 40 RPM, 4 KFT-LB5 TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 22 KLBS jWOB I- PU 93 KLBS, SO 90 KLBS, ROT 91 KLBS - TAKE MWD SURVEYS EVERY -94' MD - CONTINUE TO TAKE GYRO SURVEYS AS II REQUIRED I - WASH 30 FT PRIOR TO GYRO - MUD WEIGHT INIOUT = 8.7 PPG ` MWD SURVEY PASS SPERRY OC AT 1107' MD BUT NEXT SURVEYAT 1201' FAILED DIP. SURVEY AT 1295' MD PASSED SPERRY QC. 1,942.0 SURF I DRILL 13-112" SURFACE HOLE FROM 1330' MD !TO 1942' MD, 1918' TVD 1- 550 GPM, 1350 PSI ON BOTTOM, 1190 PSI } '.OFF BOTTOM, f - 40 RPM, 3 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 15-22 KLBS FWOB - PU 107 KLBS, SO 97 KLBS, ROT 101 KLBS -TAKE MWD SURVEYS EVERY -94' MD I - CONTINUE TO TAKE GYRO SURVEYS AS { REQUIRED WASH 30 FT PRIOR TO GYRO - MUD WEIGHT INIOUT = 8.8 PPG 2,243.0 ,I 1.50 DRILL P 1 2,243.0 SURVEYS CLEANED UP AND PASSED SPERRY QC AFTER 1295' MD BIT DEPTH (1233' SURVEY DEPTH) 3 CONSECUTIVE CLEAN MWD SURVEYS THAT MATCH GYRO PER VALIDATION CRITERIA OBTAINED AT SURVEY DEPTHS: 1233' MD, 1327' MD, 1423' MD. RIG DOWN AND RELEASE GYRO AT AFTER _ ! OBTAINING THIRD MATCHING SURVEY, — - SURF DRILL 13-112' SURFACE HOLE FROM 1294' MD TO 2243' MD, 2195' TVD - 550 GPM, 1460 PSI ON BOTTOM, 1300 PSI j OFF BOTTOM, 1- 40 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 4 KFT-LBS TORQUE OFF BOTTOM, 12-20 KLBS jWOB j - PU 116 KLBS, SO 96 KLBS, ROT 106 KLBS - TAKE MWD SURVEYS EVERY -94' MD 1- MUD WEIGHT INIOUT = 8.8 PPG I WELL SITE GEO CALLED BASE OF _ 'PERMAFROST 2011' MD, 1_981' TVD_ SURF PLANNED WIPER TRIP FROM BASE OF (PERMAFROST: CIRCULATE 2X BOTTOMS UP PRIOR TO PERFORMING WIPER TRIP, RACK BACK I STAND WITH EACH 130TTOMS UP. - 550 GPM, 1420 PSI - 40 RPM, 4-6 KFT-LBS TORQUE Printed 11/4/2019 2:20:52PM **AII depths reported in Drillers Depths** ALASKA Operation summary Report I AFE No Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Start Date: 9/312019 Project PBU Site: 01 Rig Name/No.: PARKER 272 1 Spud Dateffime: 8M Rig Contractor. PARKER DRILLING CO. -- -- _, Active datum: ACTUAL KB P272 G86.5ft (above Mean Sea Level) Date 16:30 From - To tars Task Code 19:00 , 2.50 DRILL P I 1 19:00 21:00 i 21:00 - 00:00 l 9/7/2019 , 00:00 2.00 3.00 - - L- - - 12:00 1 12.00 End Date: 9/20/2019 NPT Total Depth Phase (ft) --- 2,243.0 SURF H-S4DW0019FK-EX-Dl-DN- (7,293,574.00) Rig Release: 9122!2019 I BPUOI: USA00006556 Description of Operations PLANNED WIPER TRIP FROM BASE OF IPERMAFROST: PULL OUT OF THE HOLE FROM 2056' MD TO ITOP OF THE DRILL COLLARS AT 184' MD I- MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC - MUD WEIGHT IN/OUT = 8.8 PPG TIGHT HOLE: 1- 35 KLBS OVER PULLS FROM 2056' MD TO 1934' MD, ATTEMPT TO WORK THROUGH - ORIENT MOTOR HIGH SIDE AND WASH j THROUGH TIGHT SPOTS WITH 550 GPM, 1310 1 PSI �- 35 KLBS OVER PULLAT 1802' MD, ORIENT I MOTOR HIGH SIDE AND WASH THROUGH I TIGHT SPOTS WITH 550 GPM, 1192 PSI I CONTINUE PULLING ON ELEVATORS FROM 11785' MD TO 184' MD 1 MONITOR WELL WITH HOLE FILLAND TRIP } TANK: GOOD FILL i i- MONITOR THE WELL FOR 10 MIN AT THE IT_OP OF THE BHA: STATIC DRILL �P 1T 2,243.0 l SURF PLANNED WIPER TRIP FROM BASE OF (PERMAFROST: I II RUN IN THE HOLE ON ELEVATORS WITH BHA 1 #1 FROM 184' MD TO 2130' MD I - FILL PIPE EVERY 2000' MD - MONITOR WELL WITH TRIP TAN KAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT INIOUT = 8.8 PPG TAG FILLAT 2130' MD, 113' HIGH, WASH AND DRILL P DRILL P �I I 2,435.0 I 3,665.0 REAM TO BOTTOM 1- 550 GPM, 1500 PSI - 20 RPM, 1-12 KFT-LBS TORQUE SURF TDRILL 13-1!2° SURFACE HOLE FROM 2243' MD TO 2435' MO, 2356' TVD - 550 GPM, 1620 PSI ON BOTTOM, 1520 PSI OFF BOTTOM, - 40 RPM, 8 KFT-LBS TORQUE ON BOTTOM, 4 KFT-LBS TORQUE OFF BOTTOM, 155-20 KLBS I WOB - PU 127 KLBS, SO 98 KLBS, ROT 108 KLBS TAKE MWD SURVEYS EVERY -94' MD _ - MUD WEIGHT IN_IOUT_= 8.9 PPG SURF DRILL 13-112- SURFACE HOLE FROM 2435' MD TO 3665' MD, 3333' TVD 1- 550-650 GPM, 2170 PSI ON BOTTOM, 1630 PSI OFF BOTTOM, 1- 40 RPM, 10 KFT-LBS TORQUE ON BOTTOM, I I KFT-LBS TORQUE OFF BOTTOM, 12-30 KLBS IWOB PU 154 KLBS, SO 99 KLBS, ROT 123 KLBS - TAKE MWD SURVEYS EVERY 30' MD FOR DLS >5°1100 - TAKE MWD SURVEYS EVERY -94' MD FOR DLS <5°1100 1- MUD WEIGHT IN10UT = 8.9 PPG Printed 11/4/2019 2:20:52PM **All depths reported in Drillers Depths— opeMtion Sulrnmtary ROPOrt Common Well Name: 01-37 Start Data: 9/3/201 Event Type: DRL- ONSHORE (DON) I 9 End Date: 9120!2019 I L Project: PBU Site: 01 Rig NanxdNo.: PARKER 272 j Spud Da1&TI e: 9/5/2019 2:00:OOAM Rig Contractor. PARKER DRILLING CO — — - Active datum: ACTUAL KB P272 086.5R (above Mean Sea Level) Date From - TO ; Hrs Task Code NPT Total Depth I Phase AFE No 1 H-S4DW0019FK EX -Di -DN- (7,293,574.00 ) 7 i Rig Release: 912212019 BPUOI: USA00008556 Description of Operations __ �R}----—-----— 12:00 - 13:30 1.50 DRILL P 3,808.0 SURF DRILL 13-112' SURFACE HOLE FROM 3665' M 1 1330 - 16:30 16:30 - 17:30 i 17:30 18:30 I x18:30 20:00 --+-- I 3.00 DRILL ' P 3,608.0 1.00 1.00 DRILL P 3,808.0 i 1 I 1 I I DRILL P 3,808, I TO 3808' MD, 3460' TVD —T:--6--50 650 GP , 2160 PSI UN BOTTOM, 1820 PSI i OFF BOTTOM, 1- 40 RPM, 10 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM, 20-30 KLBS WOB - PU 170 KLBS, SO 108 KLBS, ROT 125 KLBS TAKE MWD SURVEYS EVERY -94' MD MUD WEIGHT IN/OUT = 9.0 PPG I 1 ANCHORAGE AND WELL SITE GEOS CALLED -� -- TD_AT3808'MD ___ SURF CIRCULATE 3X BOTTOMS UP, RACKING 1 STAND EVERY 20 MIN FROM 3808' MD TO I 3287' MD - 650 GPM, 1900 PSI - 50 RPM, 8 KFT-LBS TORQUE__ SURF PLANNED WIPER TRIP FROM TD TO BASE OF PERMAFROST: j PULLOUT OF THE HOLE ON ELEVATORS FROM 3287' MD TO 2368' MD I- MONITOR WELL FOR 10 MINUTES PRIOR TO i PULLING OFF BOTTOM: STATIC - PU 130 KLBS, SO 96 KLBS AT 2380' MD - MUD WEIGHT IN/OUT = 9.0 PPG - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL I TIGHT HOLE: - OVER PULLS UP 80 KLBS OVER FROM j 2375-2368' MD I- ORIENT MOTOR HIGH -SIDE AND ATTEMPT TO PULL PAST 2368' MD _WITH NO SUCCESS. 0 j SURF PLANNED WIPER TRIP FROM TD TO BASE OF PERMAFROST: 3,808.0 1 j PUMP OUT OF THE HOLE FROM 2368' MD TO 12238' MD, TOP OF PLANNED WIPER TRIP, I WITH NO ROTATION - CIRCULATE 1X BOTTOMS UP, RACK BACK STAND EVERY 20 MIN I- 550 GPM, 1540 PSI I- SIGNIFICANT AMOUNT OF CLAYAND IG_RA_VELAT_BO_TTOMSUP. _ --- SURF PLANNED WIPER TRIP FROM TD TO BASE OF PERMAFROST: Printed 1114!2019 2:20:52PM —All depths reported in Drillers Depths** RUN IN THE HOLE ON ELEVATORS WITH BHA #1, FROM 2238' MD TO 3808' MD I - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT 1- MUD WEIGHT INIOUT = 9.0 PPG TIGHT HOLE: - SET DOWN 30-50 KLBS FROM 2300' MD TO 13285' MD TO GET THROUGH t+rRi1R(tf�i'e�s `tt Op9mg(m Summwy Report r,...,mnn WON Name: 01-37 Event Type: DRL- ONSHORE (DON) 1 Start Date: 9!3!2019 1 End trate: arzuuzu I y Project PBU Ria Name/No.: PARKER 272 Site: 01 Spud Datemme: Rig Carrtractor PARKER DRILLING CO_ - - - - - - - KB P272 X86 5tt (above Mean Sea Laveq i AFE No H-S4DW0019FK-EX-D1l-DN- (7,293,574.00 } Rig Release: 9!22!2019 BPUOI: USA00006556 Active datum. ACTUAL Description of Operations Date i From 1 20:00 - 22:30 To I Hrs Task Code 11 NPT I Total Depth !I -Phase , (hr)` --- (ft)---------- -r------�� 3,808.0 SURF I CIRCULATE 3X BOTTOMS UP, RACKING 1 22:30 2.50 MILL P STAND EVERY 20 MIN FROM 3808' MD TO 13381' M D I 650 GPM, 1800 PSI �- 50 RPM, 8 KFT-LBS TORQUE 1 HOLE CLEANED UP AFTER 2.5X BOTTOMS UP J_ 00:00 1.50 -DRILL ` P 3,808.0 SURF. PULL OUT OF THE HOLE ON ELEVATORS WITH BHA #1 FROM 3381' MD TO 2151' MD 1 I 9!812019 00:00 - 02:00 1� 02:00 - 03:00 03:00 - 05:00 I -.-- _4------F--- 105:00 - 05:30 1 0.50 05.30 - 07:30 1 2.00 k - MONITOR WELL FOR 10 MINUTES PRIOR TO I. PULLING OFF BOTTOM: STATIC PU 158 KLBS, SO 102 KLBS AT 3381' MD } - MUD WEIGHT INIOUT = 9.1 PPG 1- MONITOR WELL WITH HOLE FILLAND TRIP I TANK: GOOD FILL NO HOLE ISSUES NOTED WHILE PULLING_ D8.0 I SURF i CONTINUE TO PULLOUT OF THE HOLE ON 1 ELEVATORS WITH BHA#1, FROM 2151' MD TO 1630' MD PU 120 KLBS, SO 100 KLBS AT 2151' MD MUD WEIGHT IN/OUT = 9.0 PPG MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL - ANO HOLE ISSUES NOTED WHILE PULLING_ 508.0 SURF 'SLIP AND CUT 336' OF DRILL LINE CALIBRATE BLOCKS.----.-- 108,0 LOCKS-_308.0 SURF PULL AND LAY DOWN BHA 81, FROM 630' MD PER BAKER DD MUD WEIGHT INIOUT = 9.0 PPG MONITORWELLWITHHOLEFILLANDTRIP ITANK: GOOD FILL RACK BACK 5" HWDP FOR NEXT HOLE SECTION 11 LAY DOWN JAR STAND - LAY DOWN FLEX COLLARS, ONTRAK AND MOTOR ASSEMBLIES i-DULLBITGRADE:5-3-FC-A-E-2-NO- 1i- CASING P 3,808.0 1 SURF I CLEAN AND CLEAR RIG FLOOR ~ r 38080 SURF RIG UP TO RUN 10-314", 45.5 #/FT, L-80, VAM21 CASING I P I 3,805.0 ! CASING - MAKE UP VOLANT TOOL AND BAIL I EXTENSIONS I- RIG UP DOYON CASING SPIDERS AND 1 10-314" ELEVATORS I I VERIFY PIPE COUNT 1N PIPE SHED_ _ Printed 11/4/2019 2:20:52PM `•AII depths reported in Drillers Depths" _:,....POW operation Slummary Rem ■ I� ------------- —� 'IAFENa Common Well Name: 01-37 H-S4DM019FK-EX-D7-DN- (7.293.574.00) Event Type: DRL- ONSHORE (DON) I Start Date: 913@019 End Dale: 91201,20 1 9 Project: PBU Site: 01 Rig NamelNo.: PARKER 272 Spud DaWflnle: 9/5/2019 2:00:OOAM Rig Contractor: PARKER DRILLING CO_ - - -- -� Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Date I From - To HrsTask Code I— _ (hr) - ---- - -- �07:30 - 20:30 rt 13.00 � CASING I P Rig Release: 9!2212011: BPUOI: USA00006556 NPT Total Depth 'I Phase (ft) -4— - - --� - -- 3,808.0 SURFRLU Description of Operations - BAK� SHOE TRACK CONNECTIONS - CHECK FLOATS: HOLDING - USE JET LUBE SEAL GAURD PIPE DOPE ON VAM 21 CONNECTIONS - TORQUE VAM21 CONNECTIONS TO 28,000 I FT -LBS FILL CASING EVERY 10 JOINTS OBTAIN PU/SO WEIGHTS EVERY -10 JTS - BREAK CIRCULATION EVERY 10 JTS AT 5 BPM FOR 25 BBLS TO 1 000'MD NO CIRCULATION THROUGH THE PERMAFROST BREAK CIRCULATION EVERY 10 JTS AT 5 BPM FOR 25 BBLS FROM BASE OF PERMAFROST TO 3430' MD RUN IN HOLE AT 40 70 FT/MIN FROM 1290' MD TO 3751' FT MD - MUD WEIGHT: 9.1 PPG IN, 9.1 PPG OUT POOR MAKE UP ON JOINT #86. BREAK OUT !AND LAY DOWN JOINTS #86 AND 985. j REPLACE WITH JOINTS #93 AND #94. WASH DOWN JOINT #87 AND MAKE UP HANGER JOINT, HANGER AND LANDING JOINT. WASH DOWN LANDING JOINT AND LAND ON THE RING. i - FINAL PU/SO = PU 174K, SO 105K I- MUD LOSSES WHILE RI H: 60 BBLS CENTRALIZATION: i- (1) 13.25" STRAIGHT BLADE CENT LOCKED DOWN 5' FROM PIN ON JOINT - (1) 13.25" STRAIGHT BLADE CENT LOCKED DOWN LOCKED DOWN MID JOINT ON JOINT B j- (1) 13.25" STRAIGHT BLADE CENT WITH (2)STOP RINGS V AND 15' FROM PIN ON JTS: C, 1-84 1- 87 TOTAL CENTRALIZERS, 174 TOTAL STOP RINGS Printed 111412019 2:20:52PM *"AII depths reported in Drillers Depths" Common Well Name: 01-37 Event Type: DRL-ONSHORE (DON) �t�1L e rc operation Swnmary Report - - - - --- - - - - -- AFE No Start Date: 9!3!2019 Project PBU I Site: 01 Rig NamelNo.: PARKER 272 1 Spud DateiTime: 915 Rig Contractor: PARKER DRILLING CO. - - -- - Active datum: ACTUAL KB P272 Q86.511 (above Mean Sea Level) Date From - To Hrs Task Code 20:30 - 00:003.50 I CASING P tno uaw. a,-m—w 9FK-EX-DI-DN- (7,293,574-00) Rig Release: 9/22/2019 BPUOI: USAOOOOS556 NPT 1 Total Depth 11 Phase Description of Operations r 3,808.0 SURF CIRCULATING AND CONDITION MUD STAGE UP TO CEMENTING RATE IN I BPM INCREMENTS TO FINAL CIRCULATING RATE OF 10 BPM. 1- 2 BPM, 383 PSI - 3 BPM, 395 PSI - 4 BPM, 399 PSI - 5 BPM, 380 PSI - 6 BPM, 385 PSI j-7 BPM, 405 PSI - 8 BPM, 400 PSI I - 9 BPM, 410 PSI -10 BPM, 220 PSI - CONDITION MUD TO 9.1 PPG, 19 YP - INITIAL PRESSURE AT CEMENTING RATE: 1425 PSI -FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 176 PSI I - CIRCULATE TOTAL OF 3 TIMES BOTTOMS IUP - RECIPROCATED PIPE 15 FT AT SURFACE AT I I 300 FT/MIN I SIMOPS: RIG UP AND BLOW AIR TO SLB CEMENTERS PRESSURE TEST CEMENT LINE 250/3500 I �PSI. GOOD TEST Printed 11/4/2019 2:20:52PM "All depths reported in Drillers Depths" #�toi�tArna i=Sf� Up_ erawn Summary Report --- -- ---- AFENo Cinmmnn Well Name: 01-37 „ 11— Event Type: DRL- ONSHORE (DON) Project: PBU Rig Name/No.: PARKER 272 Start Date: 9IW2019 1 End Data: erzartu' e rSite: 01 Spud DatelTme: 9/5/2019 2:00:06AM Rig Contractor. PARKER DRILLING CO_ Active datum: ACTUAL KB P272 tm86.5ft (above Mean Sea Levu Task Code i NPT `Total Depth Phase l Description of Operations 3,808.0 SURF i CEMENT 10-3/4" SURFACE CASING AS CEMT P FOLLOWS: - PUMP 100 BBLS OF 10.0 PPG MUDPUSH II SPACER AT 6 BPM, 125 PSI i- UN -STING VOLANT AND LAUNCH BOTTOM � jPLUG - PUMP 618.5 BELS (7818 SKS) OF 11.0 PPG LITECRETE LEAD AT 6 BPM, EXCESS VOLUME 350% (YIELD 1.91 CU.FTISK) - BOTTOM PLUG LANDED AT 376 BBLS OF j LEAD PUMPED, SHEAREDAT 800 PSI. I RECIPROCATED PIPE 15' AT SURFACE q WHILE PUMPING LEAD: SIGNIFICANT INCREASE IN DRAG AT 575 BBLS INTO LEAD. STOPPED RECIPROCATING AND LANDED ON THE RING AT 600 BELS INTO LEAD CEMENT. - STOP PUMPING LEAD AND SWITCH TO TAIL I WITH MUDPUSH RETURNS TO SURFACE - PUMP 53.4 BBLS (256 SKS) (CORRECTED TO j I 258 SKS ON 9126!19) OF 15.8 PPG CLASS G { } TAIL AT B BPM, EXCESS VOLUME 40%, (YIELD j 1.16 CU.FT/SK) UN -STING VOLANT AND KICK OUT TOP iPLUG WITH 10 BBLS OF WATER FROM ,CEMENTERS 9FK-EX-D1-DN- (7,293,574.00 ) BPUOI' USA00006556 Date From - To 9/9/2019 00:00 Hrs (hr) 3.50 PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.0 PPG MAXDRIL PER SCHLUMBERGER CEMENTICS PROGRAM - 261 BBLS DISPLACED AT 10 BPM: ICP 350 PSI (36% RETURN FLOW), FCP 780 PSI (44% 1 RETURN FLOW) - 73 BBLS DISPLACED AT 7 BPM: ICP 640 PSI 38% RETURN FLO CP 847 PSI (28% RETURN FLOW) 1- REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 660 I PSIU �- BMP PLUG AND INCREASE PRESSURE TO 1350 PSI AND HOLD FOR 5 MIN - BLEED OFF PRESSURE AND CHECK FLOATS: HOLDING - TOTAL DISPLACEMENT VOLUME 344.1 BBLS (MEASURED BY STROKES AT 95% PUMP EFFICIENCY) CEMENT IN PLACE AT 03:20 HRS FULLANNULAR FLUID COLUMN MAINTAINED AFTER CEMENT ENTERED ANNULUS yLO5T 27 8B! c nQ,::Qr_ THC .YOB_ A! ! AFTER CEMENT ROUNDED THE CORNER - 175 BBLS OF CEMENT RET R T Printed 11/4/2019 2:20:52PM "AII depths reported in Drillers Depths" NOM AM6rlir -At k "by operation Summary Report r- ­n Wpll Name: 01-37 Event Type: DRL- ONSHORE (DON) Start Date: 9!312019 End Data: 9/20/2019 I 3roiect: PBU Rig Name/No.: PARKER Site: 01 Spud DatWTime: Rig Contractor. PARKER DRILLING CO_ -- -- Active datum: ACTUAL KB P272 @86.511t (above Mean Sea Level) Date From - To i Hrs _ (hr) +03:30 _ 07:30 + 4.00 i I F07:30 10:30 10:30 I 3.00 Task Code •I NPT i Total Depth ! Phase CEMT AFE No i HS40W0019FK-EX-DI-DN- (7,293,574=) Rig Release: 912212019 SPUOI: USA00008556 Description of Operations —p + 3,808.0 SURF CLEAN RIG AND RIG DOWN CEMENT BOPSUR P 3,808.0 I � I I l � i � I �i 12:00 1.50 1 WHSL 12:00 - 17:00 1 5.00 117:00 - 16:00 1.00 BOPSUR I 1 I 1 BOPSUR P 08.0 s,s308.0 + 3,808.0 1 of 24 I EQUIPMENT DRAIN CEMENT RETURNS FROM STACK - SUCK OUT CELLAR i- BACK OUT LANDING JOINT AND LAY DOWN TO PIPE SHED j - DISCONNECT KNIFE VALVE AND FLUSH DIVERTER ANNULAR AND STACK WITH BLACK WATER PILL, WORKANNULAR SEVERAL TIMES RIG DOWN CASING TOOLS FROM RIG FLOOR - CLEAN AND CLEAR RIG FLOOR _-_CLEAN _SHAKER DECK AND PITS SURF NIPPLE DOWN DIVERTER SYSTEM [- NIPPLE DOWN, 20' DIVERTER LINE FROM BACK OF BOP DECK - BREAK BOLTS ON RISER AND DIVERTER IANNULAR NIPPLE DOWN KNIFE VALVE AND DIVERTER IANNULAR - MOBILIZE WELLHEAD TO BOP DECK NIPPLE DOWN RISER SIN -OPS: CLEAN PITS - REMOVE SPARE 10-314" CASING JOINTS FROM SHED - REMOVE SURFACE HOLE BHA COMPONENTS FROM SHED .-MOBILIZE INTERMEDIATE BHA _ j COMPONENTS TO PIPE SHED_—_.— SURF�NIPPLE UP FMC GEN 5 WELLHEAD PER FMC REPRESENTATIVE CLEAN AND STEAM SPEED HEADAND I CASING SPOOL -ORIENT AND INSTALL WELLHEAD SURF I NIPPLE UP SOP STACK - NIPPLE UP HIGH PRESSURE RISER AND j SPACER SPOOL NIPPLE UP BOP STACK FMC REP PRESSURE TEST SEAL ON WELL HEAD TO 1000 PSI FOR 15 MIN: GOOD TEST - CHANGE UPPER RAMS TO 4-112" x 7" VBR NIPPLE UP FLOW RISER -ATTACH TURNBUCKLES AND HOLE FILL LINES - INSTALL MOUSEHOLE i- NIPPLE UP CHOKE LINE SIMOPS: i- BRING IN 4-1/2" LINER TO PIPE SHED 1 INSTALL SECONDARY ANNULUS VALVES ON --_WELLHEAD -- ---- — — — SURF I FILL LINESAND PERFORM SHELLTEST CHECK TORQUE ON SOP FLANGES -- Printed 11/4/2019 2:20:52PM '"All depths reported in Drillers Depths*' Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project PBU Rig Name/NW PARKER 272 t�rsttTj � = l��.�► w ppemuon Summary report --- ---- AFENo Start ate: 9!312019 End Date: 9!20!2019 T Site: 01 Spud DatelTime: 91512019 2:00:OOAM Rig Contractor. PARKER DRILLING CO. - - - - - - -_ Active datum: ACTUAL KB P272 @88.5ft (above Mean Sea Level) Date From - To Mrs ` Task ` Cndp NPT 23:00 5.00 I BOPSUR 1 ------4--- , 18:00 9FK EX -DI -DN- (7,293,574.00 ) Rig Release: 9/22/2019 1 BPUOI: USA00006556 Total Depth Phase Description of Operations ifl)—----- — — --- -- 3,808.0 SURF TEST BO PER40GCCAND BP REQUIREMENT - TEST UPPER RAMS WITH 5" AND 7" TEST JOINTS TO 25015000 PSI FOR 5 CHARTED MIN - TEST LOWER RAMS WITH 4" AND 5" TEST I JOINTS TO 250/5000 PSI FOR 5 CHARTED MIN j -TEST ANNULAR WITH 4" AND 7- TEST JOINT TO 250/3500 PSI FOR 5 CHARTED MIN - TEST BLINDISHEAR RAMS, CHOKE MANIFOLD VALVES, IBOP, CHOKE AND KILL HCR, CHOKE AND KILL MANUAL VALVES, (2) NC50 FOSV, AND DART VALVE TO 250/5000 PSI FOR 5 CHARTED MIN l -TEST CHOKE MANIFOLD VALVE #8, 8, 9, AND 112 FROM BOTH DIRECTIONS i - TEST BOTH CLASS 2 FOSV FROM BOTH DIRECTIONS PERFORM DRAW DOWN TEST ON I I I, i ACCUMULATOR TEST FIRE AND GAS ALARMS FUNCTION ALL BOP COMPONENTS FROM BOTH THE RIG MANAGER'S OFFICE AND LER ` k I I [ALL TESTS WITNESSED BY RIG MANAGER I AND CSL AOGCC REPRESENTATIVE BOB NOBEL WAIVED WITNESS ON 0910912_019 AT 08:30 -- --3,808.0 t - SURF -� 1 BLOW DOWN AND RIG DOWN ALL TEST 123:00 - 23:30 0.50 BOPSUR P l I EQUIPMENT --fi-- 23:30 - 00:00 0.50 WHSUR P 3,808.0 SURF I INSTALL 9-15116 ID WEAR RING -DRIFT WEAR RING WITH BITAND GHOST I REAMER BEFORE INSTALLING l LID 4" TEST JT. ASSEMBLY -- - - -i----- 7" T 3,808.0 _ SURF MAKE UP AND RUN IN THE HOLE WITH BHA 9/1012019 100:00 - 02:00 2.00 DRILL P #2,9-718" INTERMEDIATE RSS ASSEMBLY TO 11 1785' MD PER BAKER MWD ! DD -MAKE UPAUTOTRAK, ONTRAKAND BCPM - MAKE UP 9-718" SMITH X616 BIT I- MAKE UP FILTER SUB, FLOAT SUB AND FLEX 3,808.0 SURF 'COLLARS ---- - - ---- RUN IN THE HOLE WITH BHA #2 ON 5" DRILL 02:00 X04:00 i 2.00 DRILL P ; PIPE STANDS FROM 785' MD TO 3437' MD 1 SHALLOW HOLE TEST MWD TOOLS AT 1286' MD: GOOD TEST V FILL PIPE EVERY 20 STANDS MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.0 PPG '- - r-�- - 3,808.0 SURF WAIT ON CEMENT TO REACH COMPRESSIVE 04:00 - 07:00 3.00 DRILL N STRENGTH - CEMENT IN PLACE AT 03:20 HRS ON 0 910 91201 9 - CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH AT 06:33 i 1 SIMOPS: - BUILD STANDS OF 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT- WORK 4-112" TUBING IN PIPE SHED - - Printed 111412019 220:52PM -All depths reported in Drillers Depths" ►-`op opem"Oln s't![fwwry,!tepQ!�AFE No Common W1e11 Name: 01-37 End Date: 9!20!2019 1 H-S4DW0019FK-EX-Di-DN- (7,293,574.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/3/2019 - �5ite: 07 1 project: PBU Spud Date�me: 9!5!2019 2:0O:OOAM Rig Release: 9122/2019 g Rig Name/No.: PARKER 272 BPUOI: USA00006556 Rig Contractor: PARKER DRILLING CO_ -- _ - ----- Active datum: ACTUAL KB P272 (M86.5ft (above Mean Sea I -S-0 Date From - To Hrs Task Code '.I NPT Total Depth i Phase ! Description of Operations --- - - - (h,) - 1 3,808.0 -T SURF +RIG UP AND PRESSURE TEST CA IN T 07:00 - 08:30 1.50 DRILL I p ~ 3500 PSI FOR 30 MIN -=9-0 MUD T N;OUT PPG - PUMPED 7 BBLS BLED BACK 7 BBLS - LOST 35 PSI IN FIRST 15 MIN I- LOST 11 PSI IN SECOND 15 MIN TEST MET BP CRITERIA PER 100218 I _ V P ESSURE TEST 3,808.0 SURF OUT FLOAT COLLAR AND CEMENT IN 08:30 - 12:00 3.50 DRILL P LDRILL SHOE TRACK FROM 3678' MD TO 3786' MD I j - 500 GPM, 1143 PSI ON BOTTOM, 1140 PSI j jOFF BOTTOM I I- 60 RPM, 7 KFT-LBS TO ON BOTTOM, 6 KFT-LBS TO OFF BTM, 2-5 KLBS WOB j PU 145 KLBS, SO 104 KLBS, ROT 120 KLBS MUD WEIGHT IN!_OU7_= 9.O PPG 12:00 12:30 0.50 DRILL P 3,808.0 SURF FROM 9.0 MAXDRIL-N TO 9.4 - j I PDISPLACE PG SNOWELL 750 GPM, 2,250 PSI j I j I I. - MONITOR WELL FOR 10 MIN. STATIC - --.� 3,808.0 SURF X13:30 DRILL p DRILL OUT REMAINING SHOE TRACKAND 20' 112:30 1.00 OF NEW HOLE FROM 3786' MD TO 3828' MD II 750 M, 170 PSI ON BOTTOM, 1697 PSI I i OFF BOTTOM 1- 80 RPM, 7 KFT-LBS TO ON BOTTOM, 6 ` j KFT-LBS TO OFF BTM, 5 KLBS WOB I - PU 145 KLBS, SO 104 KLBS, ROT 120 KLBS j 1 MUD WEIGHT INIOUT= 9.4 PPG _ -- - 13:30 14:00 0 0.50 .50 DRILL i p 3,808.0 SURF j 1 I CIRCULATE A BOTTOMS UP BEFORE I pER ORMINr I A7 i I �+' 750 GPM, 1840 PSI MUD WEIGHT IWOUT = 9.4 PPG -rt- -� 3,828.0 SURF 14:00 ' 15:00 1.00 DRILL P I j I RIG UP AND PERFORM LOT MUD WEIGHT: 9.4 PPG, 3808' TVD, 3460'M D I jPUMP 3.1 BBLS TO 980 PSI, BLEED BACK 2 (BBLS LOT EMW = 14.8 PPG ODE APPROVED LOT- -_ -- - -� -- ___- --------- -�INTI 15:00 - 00:00 T 9.00 DRILL P 5,152.0 .- -.- -- - _ DIRECTIONAL DRILL 9-7/8" INTERMEDIATE :HOLE FROM 3628' MD TO 5152' MD, 4550' TVD. 1 j I - 1324' IN 9 HRS, ROP 147.1 FT1HR WITH CONNECTIONS INSTANTANEOUS ROP X300 FT1HR -725 GPM, 2100 PSI ON BOTTOM, 2080 PSI I OFF BOTTOM 120 RPM, 10 KFT-LBS TO ON BOTTOM, 6 KFT-LBS TO OFF BTM, 4-9 KLBS WOB j j I PU 180 KLBS, SO 117 KLBS, ROT 135 KLBS I SURVEY EVERY - 90 FT ECD: ACTUAL = 10.2 PPG, CLEAN = 9.87 PPG MUD WEIGHT IN/OUT = 9.4 PPG - PUMP 35 BBL HIGH -VS SWEEPS EVERY 500- i-�--.L---�---SMD ----_------__-- Printed 11/4/2019 2:20:52PM •-AII depths reported in Drillers Depths"" operation Summary Report Common Well Name: 01-37 Event Type. DRL- ONSHORE (DON) Start Date: 9/3/2019 1 End Date: 9/2012019 Project: FiEW Site. 01 Rig Name/No.: PARKER 272 Spud DatelTime: 9/5/2019 2 oo=AM Rig Contractor. PARKER DRILLING CO. --- __ - Active datum: ACTUAL KB P272 Q86.5ft (above Mean Sea Level) Data From -To Hrs IaSK _(hr) -_L 9!1112019 100:00 - 12:00 12.00 DRILL 12:00 -00:00 it I I 12.00 _ --7--- 911 2f201 9 '00-00 - 12:00 12.00 Code I NPT P I DRILL I I P Total Depth MY - 6,670.0 --6,670.0 8,107.0 AFE No -DN- (7,293,574.00 ) Rig Release: 9/2212019 BPUOI: USA00006556 Phase i Description of Operations INT1 DIRECTIONAL DRILL 9-718" INTERMEDIATE I HOLE FROM 5152' MD TO 8670' MD. 1518' IN 12 HRS, ROP 127 FTIHR WITH � CONNECTIONS I- INSTANTANEOUS ROP 250-300 FTIHR 1- 725 GPM, 2376 PSI ON BOTTOM, 2367 PSI OFF BOTTOM i - 140 RPM, 14 KFT-LBS TO ON BOTTOM, 12 KFT-LBS TO OFF BTM, UP TO 15 KLBS WOB - PU 230 KLBS, SO 130 KLBS, ROT 164 KLBS -,SURVEY EVERY - 90 FT - ECD: ACTUAL= 10.2 PPG, CLEAN= 10.04 !PPG -MUD WEIGHT INIOUT = 9.419.5 PPG j - PUMP 35 BBL HIGH -VS SWEEPS EVERY 300-500' MD WITH 2O-50% INCREASE IN CUTTINGS BACK AT SHAK_ERS INT1 �DIRECTIONAL DRILL 9-718"INTERMEDIATE HOLE FROM 8670' MD TO 8107' MD. - 143T IN 12 HRS, ROP 120 FTIHR WITH CONNECTIONS - INSTANTANEOUS ROP 200-300 FT1HR 725 GPM, 2820 PSI ON BOTTOM, 2750 PSI OFF BOTTOM 1- 140 RPM, IS KFT-LBS TO ON BOTTOM, 14 KFT-LBS TO OFF BTM, UP TO 15 KLBS WOB - PU 254 KLBS, SO 150 KLBS, ROT 179 KLBS - SURVEY EVERY - 90 FT - ECD: ACTUAL = 10.78 PPG, CLEAN = 10.04 PPG 1- MUD WEIGHT IN/OUT = 10.219.5 PPG - PUMP 35 BBL HIGH -VS SWEEPS EVERY 1300-500' MD WITH 20-50% INCREASE IN 1 CUTTINGS BACK AT SHAKERS 9,221.0 INTI Printed 11/412019 2:20:52PM `*All depths reported in Drillers Depths ' - WEIGHT UP MUD SYSTEM TO 10.2 PPG P_RIORTO CM_2 ___----.----.- 6IRECTIONAL DRILL 9-718' INTERMEDIATE !HOLE FROM 6107' MD TO 9221' MD ' - 1114' IN 12 HRS, ROP 93 FT1HR WITH CONNECTIONS INSTANTANEOUS ROP 100-200 FTIHR 725 GPM, 3340 PSI ON BOTTOM, 3300 PSI OFF BOTTOM 1- 140 RPM, 20 KFT-LBS TO ON BOTTOM, 15 KFT-LBS TO OFF STM, UP TO 20 KLBS WOB PU 265 KLBS, SO 167 KLBS, ROT 197 KLBS SURVEY EVERY - 90 FT - ECD: ACTUAL = 11.25 PPG, CLEAN = 10.79 PPG - MUD WEIGHT IN/OUT = 10.2!10.2 PPG - PUMP 35 BBL HIGH -VS SWEEPS EVERY 500' MD WITH 20-25% INCREASE IN CUTTINGS I BACK AT SHAKERS I ! - COMPLETE WEIGHT UP TO 10.2 PPG PRIOR TO CM2 AT 8369' MD _ r —mnn Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project PBU Rig Name/No.: PARKER 272 14oft Mehl% = ALASM - BP operaftn Summary ill®port j Start Date: 9/312019 r-611 id Dateffima: 9/5/2019 I tna uwa: araacu 1 a AFE No H-S4DW0019FK EX -DI -ON- (7.293,574-00) Rip Release: 91221201E BPUOI: USA00006556 Rig Contractor. PARKER DRILLING CO_ - - - - Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Description of Operations Date From -To Hrs Task Code 1 NPT ` Total Depth i Phase I (hO 1 (ft) �— —~8.00 DRILL I P 9,617.0 IN 71 DIRECTIONAL DRILL 9-718' INTERMEDIATE 2:00 - 16:00 HOLE FROM 9221'M D TO 9617' MD 18:00 18:30 1 0.50 DRILL 18:30 20:30 ---k - - i21:00 20:30 2.00 I DRILL I 21:00 0.50 DRILL 00:00 i 3.00 DRILL i-7 OFF BOTTOM 1- 140 RPM, 20 KFT-LBS TO ON BOTTOM, 16 1 KFT-LBS TO OFF BTM, UP TO 20 KLBS WOB - PU 280 KLBS, $O 180 KLBS, ROT 205 KLBS SURVEY EVERY - 90 FT - ECD: ACTUAL a 11.35 PPG, CLEAN = 10.82 PPG - MUD WEIGHT IN/OUT = 10.5!10.5 PPG I - PUMP 35 BBL HIGH -V5 SWEEPS EVERY 500' MD WITH 2O-25% INCREASE IN CUTTINGS BACKATSHAKERS ------ . - -- -- Printed 11/412019 2:20:52PM **AII depths reported in Drillers Depths't - 396' IN 6 HRS, ROP 66 FT/HR WITH CONNECTIONS I- INSTANTANEOUS ROP 50-150 FT1HR - 725 GPM, 3440 PSI ON BOTTOM, 3400 PSI OFF BOTTOM ' 140 RPM, 19 KFT-LBS TO ON BOTTOM, 16 KFT-LBS TO OFF BTM, UP TO 20 KLBS WOB I PLI 276 KLBS, SO 172 KLBS, ROT 199 KLBS - SURVEY EVERY _ 90 FT i ! - ECD: ACTUAL = 11.45 PPG, CLEAN = 10.82 PPG MUD WEIGHT INIOUT = 10.5!10.5 PPG j- PUMP 35 BBL HIGH -VS SWEEPS EVERY 500' MD WITH 20-25% INCREASE IN CUTTINGS I SACK AT SHAKERS PUMP 1-35 BBL WEIGHTED SWEEP WITH �I 25% INCREASE M CUTTINGS BACKAT , I SHAKERS I II I INTRODUCE BLACK PRODUCT AND WEIGHT ji.UP MUD SYSTEM TO 10.5 PPG PRIOR TO THE TOP OF THE HRZ --- P 9,617.0 j rt INTI 'PERFORM RIG SERVICE I DRILL 9-718" INTERMEDIATE P 9,735.0 I I INTI DIRECTIONAL HOLE FROM 9617' MD TO 9735' MD — N 9,735.0 INTI CHANGE OUT SWAB IN MUD PUMP (REDUCED EFFICENCY RATE) --�-- P 9,955,0 INT1 DIRECTIONAL DRILL 9-7/8° INTERMEDIATE I HOLE FROM 9735' MD TO 9955' MD 220' IN 3 HRS, ROP 73 FTIHR WITH I CONNECTIONS - INSTANTANEOUS ROP 50-150 FT/HR 25 GPM 3500 PSI ON BOTTOM 3475 PSI i-7 OFF BOTTOM 1- 140 RPM, 20 KFT-LBS TO ON BOTTOM, 16 1 KFT-LBS TO OFF BTM, UP TO 20 KLBS WOB - PU 280 KLBS, $O 180 KLBS, ROT 205 KLBS SURVEY EVERY - 90 FT - ECD: ACTUAL a 11.35 PPG, CLEAN = 10.82 PPG - MUD WEIGHT IN/OUT = 10.5!10.5 PPG I - PUMP 35 BBL HIGH -V5 SWEEPS EVERY 500' MD WITH 2O-25% INCREASE IN CUTTINGS BACKATSHAKERS ------ . - -- -- Printed 11/412019 2:20:52PM **AII depths reported in Drillers Depths't operation Summary Report - – – — - – –– – AFE No Common Wall Name: 01-37 Event Type: DRL- ONSHORE (DON) iStart Date: 81Slzula Project: PBU Rig Name/No.: PARKER 272 Site: 01 I Spud DateMme: 9/5/2019 Rig Contractor: PARKER DRILLING CO.– – – – – – Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Date From - To 9/13/2019 00:00 - 02:30 -I- --- 02:30 - 04:00 04-00 - 05:30 x-- 05:30 - 07:00 � 07:00 08:30 �l I 08:30 10:00 Hrs 2.50 End Date: bilzwzu-i a �T Task Gods NPT I Total Depth _ (ft) _ DRILL P–-- –10,103.0 I 1.50 DRILL I I 1.50 DRILL 1.50 DRILL i I 1.50 DRILL (7,293,574.00) Rig Release: 9/2212019 BPUOI: USA00006556 Phase Description of Operations INTiDIRECTIONAL DRILL 9-718' INTERMEDIATE HOLE FROM 9955' MD TO 10103' MD -148' IN 2.5 HRS, ROP 59 FT1HR WITH 1 CONNECTIONS j- INSTANTANEOUS ROP 50-150 FT1HR - 700 GPM, 3300 PSI ON BOTTOM, 3275 PSI OFF BOTTOM j - 140 RPM, 20 KFT-LBS TQ ON BOTTOM, 16 I KFT-LBS TQ OFF BTM, UP TO 20 KLBS WOB PU 280 KLBS, SO 180 KLBS, ROT 205 KLBS SURVEY EVERY _ 90 FT I- ECD: ACTUAL= 11.35 PPG, CLEAN = 10.82 PPG - MUD WEIGHT IN/OUT =10.5110.5 PPG I t 1 P 10,103.0 INTI I } I P 10,108.0 INTI i I t P 10,113.0 INTI P 10,118.0 INTI I l 1` 1.50I DRILL P - BEGIN CONTROL DRILLING AT 9870' MD, OBSERVE TJA MARKER AT 9985 MD WITH RESISTIVITY, NO DRILLING BREAK OBSERVED AT TJA MARKER, DRILL ADDITIONAL 120' MD, 98' TVD PAST TJA MARKER PER CASING PICK MEETING WITH NO REVERSE DRILLING BREAK OBSERVED CIRCULATE BOTTOMS UP FOR SAMPLES 700 GPM, 3330 PSI - 140 RPM, 16 KFT-LBS TORQUE RECIPROCATE 60' 1- NO SAG RIVER FORMATION OBSERVED IN i BOTTOMS UP_SAMPLES__ DRILL ADDITIONAL V MD TO 10108' MD AND CIRCULATE BOTTOMS UP FOR SAMPLES - 700 GPM, 3330 PSI - 140 RPM, 16 KFT-LBS TORQUE RECIPROCATE 60' - NO SAG RIVER FORMATION OBSERVED IN !BOTTOMS UP SAMPLES DRILL ADDITIONAL 5' MD TO 10113' MD AND CIRCULATE BOTTOMS UP FOR SAMPLES 700 GPM, 3330 PSI 140 RPM, 16 KFT-LBS TORQUE I- RECIPROCATE 60' - NO SAG RIVER FORMATION OBSERVED IN BOTTOMS UP SAMPLES _ –_- DRILLADDITIONAL 5' MD TO 10118' MD AND CIRCULATE BOTTOMS UP FOR SAMPLES - 700 GPM, 3330 PSI - 140 RPM, 16 KFT-LBS TORQUE I - RECIPROCATE 80' I - NO SAG RIVER FORMATION OBSERVED IN ---.–.– ----- 10,123.0 INTI Printed 11/4/2019 2:20:5213M ••AII depths reported in Drillers Depths" BOTTOMS UP SAMPLES --- DRILL ADDITIONAL VMD TO 10123' MDAND CIRCULATE BOTTOMS UP FOR SAMPLES 1- 700 GPM, 3330 PSI 140 RPM, 16 KFT-LBS TORQUE RECIPROCATE 80' NO SAG RIVER FORMATION OBSERVED IN 1BOTTOM5UP 5AMPLES –_--- t i 1kfJ�SKA = �P 4pec tkm Mull maw R"rt ----- —~-- --- AFENo Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) II Start Date: 9/3/2019 1 tno Lisle: wAu/cu 1 a Project: PC Site: 01 Rig Name/No.: PARKER 272 Spud DalelTime: 9/5/2019 Rig Contractor. PARKER DRILLING CO.- Active O_Active datum: ACTUAL KB P272 @86.58 (above Mean Sea Level) Data j From - To i Hrs Task ` Code it NPT 111:30 _ t„ , _ - 11:30 r 1.50 t DRILL P I 17:00 5.50 DRILL I P 17:00 X17:30 0.50 17:30 - 19:302.00 I -DN- (7,293,574.00 ) Rig Release: 91221201: BPUOI: USA00006556 Total Depth ! Phase I Description of Operations (ft)_-! --.�R-D-I--N-5--DTO 1-01-28' MD -AN -D 10,128.0 INTI - E BOTTOMS UP FOR SAMPLES - 700 GPM, 3330 PSI 10,128.0 I I t I DRILL I P 10,128. I I DRILL P I k 10,128. I - 140 RPM, 16 KFT-LBS TORQUt I - RECIPROCATE 60' 1- SAG RIVER FORMATION OBSERVED IN BOTTOMS UP SAMPLES - OBSERVE TSGR RIVER ON RESISTIVITY AT 0104' MD SURVEY DEPTH - I INT1 I PULL OUT OF THE HOLE FROM BOTTOM AT 1 10128' MD TO 6682' MD I - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) WORK THROUGH TIGHT HOLE WITH 30-40 j KLBS OVER FROM 7790' MD TO 7613' MD - STOP AT 7613' MD RUN IN 3 STANDS TO 7886 AND CIRCULATE BOTTMS UP WITH 700 GPM, 13000 PSI - CONTINUE POLLING OUT OF THE HOLE, WORKTHROUGH TIGHT HOLE WITH 30-40 I KLBS OVER FROM 7600' MD TO THE GHOST j REAMER TD AT 7244' MD - PULL GHOST REAMER INTO SURFACE —CASING SHOE AT 6682' MD_ _ ��- 0 i INTI STAGE UP PUMPS AND CIRCULATE BOTTOMS UP 700 GPM, 2750 PS _ __ ()-I INTI RUN IN THE HOLE ON ELEVATORS FROM 16682' MD TO BOTTOM AT 10128' MD - WASH LAST STAND TO BOTTOM WITH 2 1 BPM, 600 PSI '-NO FILL OBSERVED 19:30 - 22:00 2.50 DRILL ` P ` 10,128.0 INTI STAGE UP PUMPS AND CIRCULATE HOLE { CLEAN 700 GPM, 3400 PSI 120 RPM, 18 KFT-LBS TORQUE - PUMP 35 BBL HIGH VIS SWEEP WITH 10% 1 INCREASE IN CUTTINGS BACKAT SHAKERS MONITOR WELL FOR 10 MIN (STATIC) _ - ! - 00:00 �- 2.00 DRILL P j 10,128.p INTI i PULL OUT OF THE HOLE ON ELEVATORS 22:00 1 FROM 101 28'MD TO 8653' MD AT MIDNIGHT - OBSERVE --30 KLBS OVERPULLAT 10000' 1 1 MD, PULL THROUGH AND WIPE TIGHT SPOT WITH NO ISSUES -r- 9/14/2019 100:00 -7--�PULL 04:00 4.00 DRILL P 10,128.0 INTI OUTTHE UN ML FROM 6530' MD TO THE OP OF THE BHA A7 - - I I -I- _---rt -----�--------- 10,128.0 INTI 1798' MD _ ___.-.--.-. 1 LAY DOWN BHA FROM 798' MD TO SURFACE rt 04.00 - 06:30 ; 2.50 DRILL P I BIT GRADE: 4 -6 -IN GAGE __.. - -- 3 - - 0 - 1.00 CASING P 10,128.0 ` INTI CLEAN AND CLEAR RIG FLOOR 1-- 06:30 - 07:30 I _ PULL WEAR BUSHING T 07:30 09:30 2.00 CASING P 10,128.0 INTI RIG UP CASING RUNNING TOOLS - RIG UP VOLANT TOOL, BAIL EXTENSIONS AND ELEVATORS -INSTALL PS -21 SLIPS DRESSED WITH 7" j SLIP BODIES DOUBLE STACK TONGS Printed 11!412019 2:20:52PM "All depths reported in Drillers Depths"` operation summary Report Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) 1 Start Date: 9!312019 End Date: 9120/2019 01 Project: PBU Site: Rio Name/No.: PARKER 272 1 Spud Date>Tme: 9/5/2019 2:00:00AM Rig Contractor. PARKER DRILLING CO Active datum: ACTUAL KB P272 G86.5ft (above Mean Sea L-0 Dat From - To 09:30 - 17:30 117:30 - 18:00 18:00 00:00 Hrs (hr) _ 1 8.00 Task CASING APE No H-S4DW0019FK EX -D1 -D N- (7,293,574.00 ) Rig Release: 912 212 0 1 9 BPUOI: USA00006556 Code NPT Total Depth 1 Phase Description of Operations ---(ftZ—--— ---. p 10,128.0 INT1 RUN 7", 26#, L-80, VAMTOP HC, INTERMEDIATE CASING TO THE SURFACE CASING SHOE AT 3798' MD CHECK FLOATS (HOLDING) j - USE JET LUBE SEAL GUARD PIPE DOPE TORQUE TURN CONNECTIONS TO 11,950 �- FT -LBS - RUN 1 FLOATING CENTRALIZERS ON I JOINTS 1-124 + SHOE TRACK FILL CASING EVERY 10 JOINTS OBTAIN PU150 WEIGHTS EVERY 10 JOINTS j- PU 117K, SO 107K �- MUD WEIGHT: 10.5 PPG IN, 10.5 PPG OUT HOLD 01 KICK WHILE TRIPPING DRILLAND AAR 10,128.0 1 INTI CIRCULATE 1X BOTTOMS UP AT THE SURFACE CASING SHOE - STAGE PUMPS UP TO 7 BPM, 600 PSI I — �- MONITOR WELL FOR 10 MIN (STATIC) 10,128.0`[NT1 'RUN 7',2e#, L-80, VAMTOP HC, � INTERMEDIATE CASING FROM 3798' MD TO 6448' MD USE JET LUBE SEAL GUARD PIPE DOPE TORQUE TURN CONNECTIONS T011,950 FT -LBS - RUN 1 FLOATING CENTRALIZERS ON 0.50 j CASING P I 6.00 1 CASING P 9/15/2019 +00:00 10:00 1 10.00 ; CASING � 'JOINTS 1-124 +SHOE TRACK I BREAK CIRCULATION EVERY 5-10 JOINTS j PER WELL PROGRAM AT 5 BPM FOR 25 BBL - OBTAIN PU1SO WEIGHTS EVERY 10 JOINTS �` 1l PU 180K SO 130K I- MUD WEIGHT: 10.5 PPG IN, 10.5 PPG OUT P 10,128.0 INTI RUN 7", 26#, L-80, VAMTOP HC, INTERMEDIATE CASING FROM 6448' MD TO i PLANNED SET DEPTH AT 10124' MD USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE TURN CONNECTIONS TO 11,950 FT -LBS - RUN 1 FLOATING CENTRALIZERS ON —t-- t —— -- - — — 10:00 - 14:00 4.00 1 CASING P i JOINTS 1-124 + SHOE TRACK - BREAK CIRCULATION EVERY 5-10 JOINTS PER WELL PROGRAM AT 5 BPM FOR 25 BBL CIRCULATE DOWN 5 CONSECUTIVE JOINTS AT 5 BPM TO COMPLETE A BOTTOMS UP 1 PRIOR TO THE HRZ - OBTAIN PUISO WEIGHTS EVERY 10 JOINTS 1- FINAL PU 276K SO 165K - MUD WEIGHT: 10.5 PPG IN, 10.5 PPG OUT 10,128.0 INT1 i STAGE PUMPS UP IN 1 SPM INCREMENTSTO MAXIMUM CEMENTING RATE OF 7 BPM _ 7 BPM, 668 PSI ICP, 710 PSI FCP !- RECIPROCATE 10' CONDITION MUD TO 18 YP SI MOPS: - RIG UP CEMENT EQUIPMENTAND PRESURE TEST LINES TO 4500 PSI Printed 11/412019 2:20:52PM -All depths reported in Drillers Depths" NoM ALO - SFS opematpon SumMary Report Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Start Date: 9/3/2019 tno vale: arcwcu Ia Project: PBU ­. "' Rig Name/No.: PARKER 272 Spud DatelTme: 915/2018 2:00:OOAM Rig Contractor: PARKER DRILLING CO_ -- -- _ Active datum: ACTUAL KS P272 @86.5ft (ah -a Mean Sea Level) Date ` From - To HTS __+_ (hr) (14:00 - 16:30 2.50 16:30 - i 117:00 it 18:30 - Task i Code I NPS Total Depth (ft) CASING I- P 10,128.0 17:00 0.50 CASING P 18:30 1.50 CASING i P 20:30 2.00 CASING I P x20:30 23:00 2.50 CASING P aft I AFE No TH-S4DW0019FK-EX-DI-DN- (7,293,574.00) Rig Release: 9122/2019 13PUOI: USA00006556 Phase Description of Operations � INTI CEMENT 7" INTERMEDIATE CASING AS I FOLLOWS: - PUMP 40 BBLS OF 11 PPG MUDPUSH II SPACER 9 6 BPM, 750 PSI -DROP BOTTOM PLUG PUMP 220.8 BBLS OF 11.5 PPG LITECRETE ESS VOLUME 10% (YIELD 1.71 CU.FTISK) I _ puMP 2e.8 BBLS OF 15.8 PPG CLASS G T S VOLUME 0% (YIELD 1.18 CU.FTISK) j - DROP TOP PLUG RECIPROCATED PIPE 10 FT AT SURFACE WHILE PUMPING CEMENT I- WASH UP ON TOP OF PLUGS WITH 10 BBL It OF WATER - PERFORM DISPLACEMENT WITH RIG I PUMPS AND 10.5 PPG LSND MUD PER SLB CADE - 360 BBLS DISPLACED AT 7 BPM: ICP 575 PSI, FCP 1060 PSI, DID NOT OBSERVE BOTTOM PLUG LAND 1- So BBLS DISPLACED AT 5 BPM: ICP 690 PSI, . FCP 930 PSI l- REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 730 PSI 1- BUMP PLUG AND INCREASE PRESSURE TO 11260 PSI, CHECK FLOATS - GOOD - TOTAL DISPLACEMENT VOLUME 373.6 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) CEMENT IN PLACE @ 16:30 - RECIPROCATE PIPE 10 FT AT SURFACE DURING DISPLACEMENT, STOP RECIPROCATION 335 BBL INTO DISPLACEMENT I- NO LOSSES DURING CEMENT JOB i----_ ---x-- 10,128.0 INTI CLOSE ANNULAR PREVENTERANQ ESTABLISH INJECTION DOWN THE 7" X 9-518" (ANNULUS 1- 1.5 BPM, 830 PSI TO BREAK DOWN THE FORMATION,- INJECT 5 BBL AT 700 PSI AFTER BREAKING DOWN THE FORMATION - ------+- --- - 10,12B.0 j INT1 I RIG DOWN CASING RUNNING TOOLS - RIG DOWN VOLANT TOOL, BAIL EXTENSIONS AND ELEVATORS - REMOVE PS -21 SLIPS ` 10,128.0 INTI I INSTALL T' PACKOFF - DRAIN STACK FMC ON LOCATION TO RUN IN LOCK DOWN SCREWS AND PRESSURE TEST PACKOFF TO 3500 PSI FOR 15 MIN I.-TESTAPPROVE_DBY_WS_UP -�-- --j----T-- 10,128.0 INTI CHANGE OUT UPPER RAMS TO 2-718" X 5" VBR I CLOSE BLIND RAMS AND MONITOR WELL I WITH CONTINUOUS HOLE FILL THROUGH I MUD CROSS SIMOPS: - --- _ CHANGE OUT SAVER SUB TO HT -38 Printed 1114/2019 2:20:52PM -All depths reported in Drillers Depthse' Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project PBU Ria Name/No.: PARKER 272 Operation Summary Report StartaD te: 9/3/2019 End Date: 9/2012019 Site: 01 Spud DatelTime: 91512019 2:00:OOAM Rig Contractor. PARKER DRILLING CO. KB P272 gh86 5ft (above Mean Sea Level) AFE No I H-S4DW0018FK-EX-DI-DN- (7.293.574.00) 1 Rig Release: 912212 0 1 9 BPUOI _USA00006556 Active datum. ACTUAL To Hrs Task i Cade !I NPT TotalDepth!I Phase Description of Operations Printed Date I From - i ---------- 10,128.0 INTI PRESSURE TEST UPPER RAMS To 260 PSI 23:00 - 00:00 1.00 CASING P j LOW AND 3500 PSI FOR 5 MIN EACH j TEST WITH 4" TEST JOINT PERFORM WEEKLY FUNCTION TEST OF ROPE - - -' --�- - --L------- 9/16/2019 00:00 - 00:30 0.50 � �~ CASING CASING i P ------ 10,128.0 -------- INTI I PRESSURE TEST UPPER RAMS TO 250 PSI LOW AND 3500 PSI FOR 5 MIN EACH I - TEST WITH 4-112" TEST JOINT CASING P 10,128.0 INTI RIG DOWN TESTING EQUIPMENT 00:30 - 01:30 1.00 - PULL TEST PLUG I SET WEAR BUSHING (8-15116" 1D) -_ _ fi __ -- i -- --+ 10,128.0 a -- r-- - INTI MAKE UP 6-118" PRODUCTION HOLE BHA TO 01:30 - 04:30 3.00 I CASING P i TOTAL LENGTH OF 795' MD SHALLOW HOLE TEST THE DIRECTIONAL TOOLS AT 795' MD I - tNJECT 2 BBL DOWN OA EVERY 2 HRS_ INTI RUN IN THE HOLE ON 4" DP FROM 795' MD TO 04:30 - 09:00 4.50 CASING P 1 1 { 10,128.0 I 19800' MD I 1- MUD WEIGHT: 10.5 PPG 1N/OUT -' -- -- +-- CA51NG P I CASING 10,126.0 I INTI WAIT ON CEMENT 108:00 - 13:00 4.00 i - FREEZE PROTECT OA WITH 105 BBL OF 8.8 I PPG DIESEL - INJECT AT 2 BPM, 950 PSI II I '- BUILD STANDS OF 4" DP OFFLINE i -PERFORM TABLE TOP D2 AND D4 DRILLS I WITH RUSSEL WOODS' CREW 1 PERFORM FULL D2 AND D4 DRILL WITH ' II I LYLE BUCKLER'S CREW _ 1------- - -�--- rt- --P CASING ____ 10,128.0 _ -.fi--- -- --- - INT1 PRESSURE TEST T' INTERMEDIATE CASK 13:00 - 14:30 1.50 TO 3500 PSI HIGH FOR 30 MIN -T TAPPROVED BY BP WSU_P-- - i -- - ---101280 INTI DRILL OUT CEMENT AND FLOAT COLLAR -�- �- 14:30 - 18:00 3.50 CASING j P 10.128.0 i FROM 9990' MD TO 10114' MD 1- WASH DOWN AT 250 GPM AND TAG THE TOP I OF CEMENT AT 9990' MD 250 GPM, 2350 PSI, 80 RPM, 10 KFT-LBS !TORQUE, UP TO IO KLBS WOB —1 — --—:——r-----� 10,128.0 ------ INTI DISPLACE WELL TO 8.6 PPG QUICKDRIL-N 18:00 20:30 2.56 CASING I P I PUMP 50 BBL SEAWATER, 40 BBL HIGH VIS SPACER, FOLLOWED BY 8.6 PPG I I QUICKDRIL-N I 300 GPM, MAX PRESURE 3670 PSI, FINAL PRESSURE 1750 PSI -MONITOR FOR 15_MIN_(TATIC) --- --�--* -t P t 10,128.0 _WELL INT1 iDRILL OUT CEMENT AND THE FLOAT SHOE 20:30 - 21:00 0.50 CASING ! TO 10124' MD ` MONITOR WELL FOR- 15 MIN (STATIC) - -- -�- -� -- - - rt_._._.-------- r- -10,128.0 P - -- - PROD1 I DIRECTIONAL DRILL 6-118" PRODUCTION 21:00 - 00:00 3.00 DRILL 1 HOLE FROM 10128' MD TO 10171' MD 43 FT IN 3 HRS: 14 FTIHR ROP j - 300 GPM, 1550 PSI ON/OFF BOTTOM 80 RPM, 10 KFT-LBS TORQUE ON, 9 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB I- PU 190 KLBS, 50 13OKLBS, ROT 153 KLBS SURVEY EVERY 30', NO BACK REAMING AT CONNECTIONS PG.- --MUD WEIGHT INIOUT = 8.6 PPG-.- -- - -- - Printed 11/4/2019 2:20:52PM •*AII depths reported in Drillers Depths" Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Project: PBU PARKER 272 ,AL0M _"8P operation Summary ROPOd Start Date: 9/3/2019 1 ena uara: ntcwZU i a i �Sile: 01 Soud DateJTme: 915/2019 2:00:00AM Rig Contractor. PARKER DRILLING CO. --- — — _ Active datum: ACTUAL KB P272 @86.511 (above Mean Sea Levu Data From - To Hrs Task _ (hr) _ 9/17/2019 100:00 - 12:00 .r DRILL 12:00 - 00:00 j 12.00 1 DRILL Code NPT Total Depth p + 10,640.0 P Phase AFE No tH-S4DW0019FK-EX-D1-DN- (7,293,574-00) I Rig Release: 9/22/2019 BPU01: USAOOg06556 Description of Operations PROD1 DIRECTIONAL DRILL 6-118" PRODUCTION HOLE FROM 10171' MD TO 10640' MD -469 FT IN 12 HRS: 39 FT/HR ROP WITH CONNECTIONS AND SURVEYS - 300 GPM, 1644 PSI ONIOFF BOTTOM - 150 RPM, 12 KFT-LBS TORQUE ON, 11 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB PU 207 KLBS, SO 130 KLBS, ROT 157 KLBS - SURVEY EVERY 3q' FOR DLS >5° �- MUD WEIGHT INIOUT = 8.7 PPG GASWATCH BACKGROUND AVERAGE= 100 UNITS, MAX = 1042 UNITS - SLOW ROP THROUGH THE SHUBLIK 10-20 FPH INSTANTANEOUS, TO THE TOP OF THE TSAD AT 10246' MD, ROP INCREASED TO 100 - 150 FPH INSTANTANEIOUS IN THE TSAD I - OBSERVE CONNECTION GAS INCREASING, I ALLOW MUD WEIGHT TO INCREASE TO 8.7 I I PPG TO MITIGATE CONN_E_CTIONGAS_, — —�---- I � 11,312.0 � PRODi DlRECTIONAL DRILL X118' PRODUCTION j HOLE FROM 10640' MD TO 11312' MD 872 FT IN 12 HRS: 56 FT1HR ROP WITH I CONNECTIONS AND SURVEYS 1- 300 GPM, 1680 PSI ON10FF BOTTOM - 150 RPM, 13 KFT-LBS TORQUE ON, 11 KFT-LBS TORQUE OFF, UP TO 15 KLBS WOB - PU 213 KLBS, SO 124 KLBS, ROT 154 KLBS - SURVEY EVERY 30' FOR DLS >5° MUD WEIGHT lN1OUT= 8.7 PPG GASWATCH BACKGROUND AVERAGE = 300 1 UNITS, MAX = 808 UNITS II :I -PUMP 35 BBL HIGH VIS SWEEP AT 10650' ` MD, WITH NO INCREASE IN CUTTINGS BACK I AT SHAKERS PUMP 35 BBL HIGH VIS SWEEP AT 11128' MD, 1 WITH NO INCREASE IN CUTTINGS BACKAT —.. SHAKERS--_.—-- ----- Printed 11/4/2019 2:20:52PM "All depths reported in Drillers Depths" - F� operaftil l S>uml nary Report Event Type: DRL- ONSHORE (DON) Start Date: 9!3@019 End Date: 9!20!2019 Project: PBU Site: 01 Rig K—No.: PARKER 272 1 Spud Daterrime: 9/5/2019 Rig Contractor: PARKER DRILLING CO. -- -- Active datum: ACTUAL KB P272 086.5ft (above Mean Sea Level) Date From - To Hrs Task j 9118!2019 100:00 - 12:00 r 12.00 112:00 -00:00 12.00 Code 1. NPT DRILL I P �1 AFE No — I H-S4DW0019FK-EX-Di-DN- (7,293,574.00 ) Rig Release: 9122!2019 BPU01: USA00006556 Total Depth I Phase i Description of Operations f— 12,253.0 1 PROD1 j DIRECTIONAL DRILL 6-118" PRODUCTION j HOLE FROM 11 312'MD TO 12253' MD 1- 941 FT IN 12 HRS: 78 FT/HR ROP WITH CONNECTIONS AND SURVEYS 1- 300 GPM, 1830 PSI ON10FF BOTTOM 1- 150 RPM, 16 KFT-LBS TORQUE ON, 13 1 KFT-LBS TORQUE OFF, UP TO 20 KLBS WOB I - PU 205 KLBS, SO 117 KLBS, ROT 147 KLBS - SURVEY EVERY 90' FOR DLS 15", EVERY 30' i FOR DLS -5° - MUD WEIGHT IN10UT = 8.7 PPG - GASWATCH BACKGROUND AVERAGE = 300 UNITS, MAX=1379 UNITS, OBSERVE GAS SPIKESAT BOTTOMS UP FROM SHUBLIK AFTER CONNECTIONS 13,160.0 j PROD1 Printed 111412019 2:20:52PML —All depths reported in Drillers Depths— I- PUMP 35 BBL HIGH VIS SWEEP AT 11590' MD WITH 50% INCREASE IN CUTTINGS BACK AT SHAKERS - PUMP 35 BBL HIGH VIS SWEEP AT 12184' j MD, WITH 25% INCREASE IN CUTTINGS BACK AT SHAKERS 1 DfRECTIONAL DRILL 6-118" PRODUCTION HOLE FROM 12253' MD TO 13180' MD - 907 FT IN 12 HRS: 76 FTIHR ROP WITH CONNECTIONS AND SURVEYS 300 GPM, 1950 PSI ONIOFF BOTTOM 150 RPM, 18 KFT-1-135 TORQUE ON, 13 jl KFT-LBS TORQUE OFF, UP TO 20 KLBS WOB, REDUCE WOB TO 12K PER WELL PROGRAM j BUCKLING MODELING j - PU 194 KLBS, SO 111 KLBS, ROT 143 KLBS - SURVEY EVERY 90' FOR DLS <5°, EVERY 30' FOR DLS >5° 1- MUD WEIGHT INIOUTa 8.8 PPG I - GASWATCH BACKGROUND AVERAGE = 300 UNITS, MAX = 1426 UNITS, OBSERVE GAS SPIKES AT BOTTOMS UP FROM SHUBLIK AFTER CONNECTIONS - PUMP 35 BBL HIGH VIS SWEEP AT 13015' j MD. WITH 50% INCREASE IN CUTTINGS BACK LAT SHAKERS --.--- opea#on Summary f tape ct Common Well Name: 01-37 Event Type: RRL- ONSHORE (DON) I Start Date: 913/2018 Project: PBU rt Site: 01 Rig Name/No.: PARKER 272 Spud DatelTime: 9!5!2019 Rig Contractor: PARKER DRILLING CO. - - -- Active datum: ACTUAL KB P272 #B86.5ft (above Mean Sea Level) Date From - TO Hrs Task Code NPT II Total (ft) i Phese Description of Operations __O --- ----------- ILL 8l1812019 12.00 DRILL P 13,834.0 I` PROD1 HOLE FROM 13160' MD1 O PRODUCTION 13834'MD 1 End Data: 8/20/2019 2:0O:OOAM —. Pte AFE No H-S4DW0019FK EX -D1 -DN- (7,293,574.00) i Rig Release: 912212019 BPUOI: USA00006556 12:00 18:00 j 6.00 18:00 I - 674 FT IN 12 HRS: 56 FT/HR ROP WITH CONNECTIONS AND SURVEYS �- 300 GPM, 1950 PSI ON/OFF BOTTOM 150 RPM, 15 KFT-LBS TORQUE ON, 12 KFT-LBS TORQUE OFF, UP TO 12 KLBS WOB, j REDUCE WOB TO 12K PER WELL PROGRAM BUCKLING MODELING f - PU 184 KLBS, SO 130 KLBS, ROT 147 KLBS i - SURVEY EVERY 80' FOR DLS 45°, EVERY 30' I FOR DLS >5" - MUD WEIGHT INIOUT = 8.7 PPG GASWATCH BACKGROUND AVERAGE = 300 I UNITS, MAX = 450 UNITS, OBSERVE GAS SPIKES AT BOTTOMS UP FROM SHUBLIK AFTER CONNECTIONS - PUMP 35 BBL HIGH VIS SWEEP AT 13775' MD, WITH 50% INCREASE IN CUTTINGS BACK i IAT SHAKERS ----- -- _. DRILL P 14,275.0 PRO61 I DIRECTIONAL DRILL 6 118` PRODUCTION HOLE FROM 13834' MD TO SECTION TD AT ! i 14275' MD 441 F� T IN B HRS: 74 FT/HR ROP WITH CONNECTIONS AND SURVEYS i - 300 GPM, 2000 PSI ON/OFF BOTTOM 1- 150 RPM, 16 KFT-LBS TORQUE ON, 15 I KFT-LBS TORQUE OFF, UP TO 12 KLBS WOB, I REDUCE WOB TO 12K PER WELL PROGRAM BUCKLING MODELING - PU 208 KLBS, SO 123 KLBS, ROT 145 KLBS - SURVEY EVERY 80' FOR DLS s5 EVERY 30' If FOR DLS >5" MUD WEIGHT INIOUT = 8.7 PPG ` - GASWATCH BACKGROUND AVERAGE = 300 ` E UNITS, MAX= 1180 UNITS, OBSERVE GAS -- it SPIKES AT BOTTOMS UP FROM SHUBLIK AFTER CONNECTIONS - + 14,275.0 PROW I CIRCULATE HOLE CLEAN WITH 1.5 BOTTOMS 19:00 1.00 DRILL P I P 19:00 - 21:30 -4- --- 21:30 - 22:00 j U 350 GPM, 2500 PSI 120 RPM, 12 KFT_-LBS_TOR_QUE ---_ 2.50-~ DRILL P r- ---� --- 14,275.0 ` PROD1 PULL OUT OF THE HOLE FOR SHORT TRIP TO I THE 7" CASING SHOE AT 101 24'MD I MONITOR WELL FOR 10 MIN PRIOR TO I PULLING OFF BOTTOM AND AT THE 7" SHOE I (STATIC) � - NO ISSUES PULLING THROUGH OPEN HOLE 0.50 fi DRILL P 14,275.0 PROD1 ICIRCULATE BOTTOMS UP - 350 GPM, 2000 PSI - 80 RPM, 6 KFT-LBS TORQUE - NO CUTTINGS OR GAS OBSERVED AT BOTTOMS UP - �- - -14,275.0 PROD1 CUT AND SLIP 88' OF DRILL LINE 22:00 - 23:00 1.00 DRILL P - RECALIBRATE BLOCK HEIGHT IN AMPHION _ SYSTEM AND CHECK CROWN-O-MATIC - .1-- - — - - - r - 14,275.0 PROD1 1 RUN IN THE HOLE FROM THE 7" CASING 23:00 00:00 1.00 DRILL P j - 'SHOE AT 101 24'MD TO 12470' MD - - - NO ISSUES RUNNING IN THE HOLE -- - - -- - r -------r------ -�-------- - -- Printed 11/4/2019 2:20:52PM -All depths reported in Drillers Depths" opergoon Summary Roport ML - Common Well Name: 01-37 Event Type: DRL- ONSHORE (DON) Stag Date: 9!3!2018 End Date: 912012019 Project: Anil +Site: 01 1 Spud Dater rime: NamelNo.: PARKER 772 Time: 9/5/2018 2:0O:OOAM Rig Contractor. PARKER DRILLING CO-- -- Active datum: ACTUAL KB P272 jm86.5ft (above Mean Sea Level) Task I Code NPT Total Depth Phase I Description of Operations — ------—— DRILL P 14,275.0 PROD1 I RUN IN THE HOLE FROM 12470' MD TO BOTTOM AT 14275' MD —i- NO ISSUES _RUNNING IN THE HOLE__ _ DRILL P 14,275.0 PROD1 I. CIRCULATE HOLE CLEAN WITH 2X BOTTOMS iUP 350 GPM, 2500 PSI I. - 120 RPM, 12 KFT-LBS TORQUE t - PUMP 35 BBL HIGH VIS SWEEP SURFACE TO SURFACE, NO INCREASE IN CUTTINGS BACKAT SHAKERS i GAS 10493 UNITS OF ENTRAINED �I GAS IN THE MUD AT BOTTOMS UP WITH 1% LEL IN THE SHAKER ROOM, MAKE NOTIFICATIONS TO WOS ODE AND WSUP —�-14,275.0 1 PROD1 I PULLOUT OF THE HOLE FROM 14275' MD TO 03:00 - 10:00 7.00 DRILL P I I THE TOP OF THE BHA AT 795' MD - MONITOR WELL FOR 10 MIN PRIOR TO I PULLING OFF BOTTOM AND AT THE 7" SHOE 1 1 I t NOTSSUES PULLING THROUGH OPEN HOLE DROP 2-318" DRIFT AT THE SHOE --�— `— — — 14,275.0 PROD1 LAY DOWN THE BHA FROM 795'M D TO 10:00 - 12:00 2.00 DRILL P j SURFACE } I j -MONITOR WELLAT THE TOP OF THE BNA FOR 10 MIN (STATIC) - BIT GRADE: 3 -4 -IN GAGE ---- AFE No I H-S4DW0019FK-EX-DI-0N- (7,293,574.00) Rig Release: 9/2212019 BPUOI: USAODOOB556 Date I From 9120!2019 �U:DD 01:00 - To j Hrs 01:00 .i 1.00 03:00 2.00 Printed 1114/2019 2:20:52PM -All depths reported in Drillers Depths" Common Well Name: 01-37 Event Type: COM- ONSHORE (CON) Project: PBU Rig Name/No.: PARKER 272 op"ation Sumoutry Report Start Date: 9!20/2019 End Date: 9/2212019 I Site: 01 Rig Contractor: PARKER DRILLING CO. -- Active datum: ACTUAL KS P272 @86.5ft (above Mean Sea _ Task Code NPT 1 Total Depth I Phase Description of Operations CASING P 14,275.0 RUNPRD CLEAN AND CLEAR RIG FLOOR " CASING P 14,275.0 RUNPRD RIG UP TO RUN 4-112" PRODUCTION LINER - DOUBLE STACK TONGS WITH TORQUE TURN _ SIDE DOOR ELEVATORS _AND AIR SLIPS_ CASING P 1 14,275.0 ` RUNPRDRUN 4-1171,12.6#, 13CR-85, VAMTOP PRODUCTION LINER TO TOTAL LENGTH OF 14308' M D - CHECK FLOATS (HOLDING) - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 4440 FT -LBS �- RUN 2 CENTRALIZERS PER JOINT ONE FLOATING BETWEEN STOP RINGS AT 5' AND 15' FROM THE PIN, 1 LOCKED DOWN 10' FROM THE BOX TO -50' BELOW T' SHOE - FILL ON THE FLY AND TOP OFF EVERY 10 } JOINTS - PU BOK, 50 75K J— k I !MAKE UP LINER HANGER/PACKER ASSEMBLY -- i-ADDGELMIX -- -- CASING { - P 14,275.0 RUNPRD I CIRCULATE 1X LINER VOLUME t - S BPM, 400 PSI —-- — -- CASING P--'14,275.0�RUNPRD C NTINUE IN HOLE TO 10124' MD (7" SHOE) ON 4" DRILL PIPE RIH AT 90 FTIMIN PU i60K, SO 115K __ I-- �— — -- -- —-- CASING P I 14,275.0 RUNPRD !CIRCULATE BOTTOMS UP 1 5 BPM, 675 PSI - OBSERVE 500 UNITS OF GAS AT BOTTOMS _ +- - CASING I P 14,275.0 RUNPRD I RUN INTO OPEN HOLE WITH LINER FROM 10124' MD TO PLANNED SET DE T MD, (TOL @ 9965'M - TIS CULATING, WASH DOWN LAST STAND AT 2 BPM OBTAIN PUISO WEIGHTS EVERY 5 STANDS PU 164K, SO 133K �- MUD WEIGHT: 8.8 PPG IN, 8.8 PPG OUT - MUD LOSSES WHILE RIH: -10 BPH — CASING P� 14,275.0 RUNPRD STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE i OF 5 BPM. 3 BPM, 775 PSI - @ 5 BPM, 1200 PSI CONDITION MUD TO 8.7 PPG, 5 PV, 15 YP INITIAL PRESSUREAT CEMENTING RATE: 1200 PSI - FINAL PRESSUREAT CEMENTING RATE AFTER HOLE CONDITIONED: 1100 PSI - CIRCULATE TOTAL OF 3 TIMES BOTTOMS UP 1 RECIPROCATED PIPE 10 FTAT SURFACE ` OBSERVE 500 UNITS OF GAS AT BOTTOMS DatelTime:91512019 2:00:00AM AFE No �H-S4DW0019FK EX -DI -DN- (2,258,000.00 ) Rig Release: 91221201£ ! BPU0I: USA00006556 Date From -TO 9/20/2019 12:00 - 12:30 x2:30 - 14:00 14:00 - 20:30 Hrs (hr) 0.50 1.50 6.50 20:30 21:00 0.50 121:00 - 00:00 3.00 9/21/2019 00:00 - 01:00 1.00 01:0004:00 i 3.00 — 104:00 - 07:30 1 3.50 Printed 11/4/2019 2:22:01PM **All depths reported in Drillers Depths" Common Well Name: 01-37 Event Type: COM- ONSHORE (CON) Project: PBU Rig Nama/No.: PARKER 272 Rig Contractor. PARKER DRILLING CO. 0j}MV00n S. um ary Roport Start Date: 9/20/2019 j End Date: 91=019 Site: 01 Spud Dateffime: 915!2019 2:00:00AM Active datum: ACTUAL KB P272 @86.58 (above Mean Sea Level) AFE No 9FK EX -DI -DN- (2,268,000.00) Rig Release: 9/2212015 BPUOI: USA00006556 Date From -To Hrs Task Code NPT Total Depth Phase Description of Operations I 0730 --09:30 2.00 CASING P 14,275.0 RUNPRD CEMENT 4-112" PRODUCTION LINER AS FOLLOWS: - FILL LINES WITH WATERAND PRESSURE I TEST TO 4500 PSI FOR 5 MINUTES - PUMP 30 BELS OF 12 PPG MUDPUSH II SPACER @ 5 BPM, 1000 PSI - PUMP 102 BBLS 2 EXTRA BBL FOR LINE VOLUME) qF 15.8 PPG CLASS G TAIL (M 5 _ BPM, EXCESS VOLUME 30% (YIELD 1.16 CU.FTISIq I- DROP DRILL PIPE WIPER DART - WASH UP LINES ON SURFACE RECIPROCATED PIPE 10 FT AT SURFACE WHILE PUMPING CEMENT PERFORM DISPLACEMENT WITH RIG PUMPS 155 BBLS DISPLACED AT 5 BPM: ICP 750 PSI, FCP 2080 PSI 12.5 BBLS DISPLACED AT 3 BPM: ICP 1500 j PSI, FCP 1800 PSI �- DISPLACEMENT FLUID: 167.5 BBLS OF 8.75 PPG, QUICKDRIL-N -LATCH UP CONFIRMED AT 102 BBLS 'DISPLACED REDUCE RATE TO 3 BPM PRIOR TO PLUG BUM P: FI NAL CIRCU LATING PRESSURE 1800 PSI iC�1 REASE PRE SURE AT PI UG 01 [UP TQ 2300 PSI, BLEED OFF AND CHECK FLOATS (HOLDING) I -TOTAL DISPLACEMENT VOLUME 187.5 UPLS - RECIPROCATE PIPE 10 FT AT SURFACE DURING DISPLACEMENT, STOPPED RECIPROCATION AFTER LATCH UP - TOTAL LOSSES FROM CEMENT EXIT 4 TO CEMENT IN PLACE: 0 BBLS 109:30 - 11:00 1 1.50 CASING P 1 T 14,275.0 RUNPRD SETAND RELEASE FROM LINER HANGER �- INCREASE PRESSURE TO 4200 PSI TO SET 'HANGER SET DOWN 50K TO CONFIRM HANGER SET - PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 60K, 15 RPM TO SET PACKER - PU TO REMOVE RS PACK -OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP - PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO. i- CIRCULATE OUT EXCESS CEMENT AND DISPLACE WELL TO SEAWATER AT 525 GPM, 2640 PSI --23 BBLS OF EXCESS CEMENT TO SURF6QL ON BOTTOMS UP 11:00 - 15:30 4.50 CASING P 14,275.0 RUNPRD PULL OUT OF THE HOLE FROM THE TOP OF THE LINER AT 9985' MD TO SURFACE - LAY DOWN LINER RUNNING TOOL, ALL _ ;COMPONENTS IN -TACT 15:30 - 16:30 1.00 RUNCOM P f '� 14,275.01 RUNCMP CLEAN AND CLEAR RIG FLOOR - FLUSH BOP STACK _ - PULL WEAR BUSHING -- 16:30 - 17:00 0.50 RUNCOM P 14,275.0fUNCMP ,RIG UP TO RUN 4-112" TUBING - SIDE DOOR ELEVATORS DOUBLESTACK TONGS WITH TORQUE TURN AIR SLIPS _ _ Printed 111412019 2:22:01 PM ""AII depths reported in Drillers Depths— Common Well Name: 01-37 Event Type: COM- ONSHORE (CON) Start Dale: 9!2012019 End Data: 9/22/2019 Project: PBU i Site: 01 Rig NamaiNo.: PARKER 272 1 Spud Detefrime: 915!2019 2:0O:OOAM Rig Contractor: PARKER DRILLING CO. -- -- Active datum: ACTUAL KB P272 @86.5ft (alcove Mean Sea Level) Date I From - To Hrs Task Code 17:00 - 00:00 7.00 RUNCOM P I� li I I 9/221201900:00 07:00 7.00 I RUNCOM I P 07:00 08:00 10:00 AFE No H-S4D W0019FK-EX-D 1 -DN- (2,268,000.00 ) Rig Release: 9/2212019 BPUOI: USA00006556 NPT Total Depth Phase Description of Operations ft--— ---— L 14 275.0 RUNCMP I RUN 4-117,12.6#, 13CR-85, VAMTOP I COMPLETION TUBING TO 5298' MD USE JET LUBE SEAL GUARD PIPE DOPE TORQUE CONNECTIONS TO 4440 FT -LBS I- THREAD LOCKALL CONNECTIONS BELOW IPACKER 14,275.0 RUNCMP 1 RUN 4-112", 12.6#, 13CR-85, VAMTOP I I COMPLETION TUBING FROM 5298' MD TO 9976' MO - TUBING SPACED OUT 5.39' FROM BOTTOM I OF PBR BASED ON TAG UP USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE TURN CONNECTIONS TO 4440 1 FT -LBS, VAM REP ON LOCATION - THREAD LOCKALL CONNECTIONS BELOW I PACKER PU 140K, SO 109K 4 SiMOPS: I _ LAY DOWN STANDS OF V DP WITH OFFLINE EQUIPMENT—. ----�-- ��_- -- r 08:00 1.00 RUNCOM P 14,275.0 RUNCMP RIG UP AND PERFORM ASSURANCE -- I I PRESSURE TEST ON LINER T03500 PSI FOR � 15 MIN —------ 10:00 2.00 I RUNCOM P 14,275.0 RUNCMP it RIG UPAND FREEZE PROTECT WELLBORE TO 21 00'MD L PUMP 75 BBL DOWN IA AT 3 BPM, 400 PSI I -ALLOW DIESELTO U -TUBE TOTUBING FOR 11 HR — — ---- —.—. r 14,275.0 RUNCMP I FMC REP ON LOCATION TO INSTALL TWC 11:30 1.50 RUNCOM P AND PRESSURE TEST TO 3500 PSI FOR 5 MIN - RIG DOWN AND BLOW DOWN TESTING EQUIPMENT — — 4.50 � SOPSUR P 14,275.0 RUNCMP I NIPPLE DOWN THE BOP STACK I I I BLOW DOWN ALL LINES I- CLEAN OUT FLOW BOX - RIG DOWN FLOW LINE AND TURN BUCKLES NIPPLE DOWN STACK AND RISERS _ - 21:00 5.00 i BOPSUR P I 14,275, RUNCMP NIPPLE UP ADAPTER FLANGE AND DRY HOLE 'TREE - CLEAN HANGER NECK PRIOR TO INSTALLING ADAPTER FLANGE PRESSURE TEST TUBING HEAD ADAPTER VOID TO 4500 PSI FOR 15 MIN, TEST APPROVED BY WOS (WSUP DOA) PRESSURE TEST TREE TO 4500 PSI FOR 5 j MIN (VISUAL LEAK TIGHT) SIMOPS: - GENERAL RIG DOWN "'*RIG RELEASED FROM 01-37 AT 21:00"' Printed 11/4/2019 2:22:01PM ••AII depths reported in Drillers Depths" THIO = TWC1010 Post Parker 272. RU Lubricator 68-839. Test new tree against < vv%,, 300/5000 psi (Pass) Charted and retained. Pull CIW "H" TWC from 130". RD Lubricator. **' 9/24/2019 Job Complete *** Final WHPs TWO = VACI010. MV=O, SSVISVIWV=C, IAIOA=OTG. T1110=TWCI010 Removed 4" Dryhole tree Temp #36 Installed new 4" GE Tree serial #5348543-5 Torqued to AP1 specs. Removed Piggyback valves from IA, Temp #115 and OA Temp #116. Installed tapped blinds with jewelry, Torqued to API specs. PT'd 2500 psi. 9124/2019 job in progress. CIO with night crew. see log for details. 1"*WELL SII ON ARRIVAL*** (new well post) RIGUP HES UNIT 046 LRS CIRC OUT W12% KCL AND U -TUBED DIESEL FOR FREEZE PROTECT DROPPED BALL AND ROD, TBG & IA TRACKING RIH W13.60" BELL GUIDE, 2" S TOOL TO SEAT B & R @ 9960' MD, STILL TRACKING 9/28/2019 **"CONT. TO 9129119 WSR*** T]1/0=0/vac/69 Temp=Sl Assist S -line (Circ -out) (B&R) Down IA up TBG down F -line pumped 5 bbl of 60140 followed by 358 bbls of 120* inhibited 2% KCL F -protect TxIA with 85 bbls of 95* diesel followed by 2.5 bbls of 60140 U-tube for 1 hour. Attemped to set packer two times by pumping total of 2.6 bbls of 40* diesel down TBG but had communication between TBG and IA. Attemped pressuring up on R&B by pumping 1.6 bbls dsl down TBG 9/28/2019 but communication to IA still was present. ***Job continued 09129119*** **Job continued from 09128119** Assist S -line (Circ-Out)(B&R) Pumped 1.4 bbls dsl down TBG to pressure up on B&R. Communication between TBG and IA was still present.Pumped 3.6 bbls of 40* diesel down TBG to check plug set Pumped 1.7 bbls to check DMV set. Pumped 250 bbls 120*f inhibited KCL to circ -out well. Then pumped 48 bbls DSL to freeze 9/29/2019 protect IA. ****Job continued on 09130119**** PULL BALL & ROD AT 9,960' MD RAN 10'x 2.25" PUMP BAILER TO 9,927' SLM (bailer empty) SET 4-112" XX PLUG AT 9,891' MD (tbg x is still communicatin Di IL Rn RFK_nrK-2 SHEAR OUT VALVE AT 4,122' MD (sheared) SET BK-DGLV AT 4,122' MD PULLED 4-112" XX PLUG AT 9,891' MD LRS CIRC 250 BBLS OF KCL, 48 BBLS OF DIESEL FREEZE PROTECT (see Irs log) DROP BALL AND ROD 9/29/2019 **'CONT. TO 9130119 WSR*** 1 P MIT- PULLED BALL & ROD AT 9,927' SLM PULL STA #5 DGLV AT 6,186' MD SET STA #5 SO GLV AT 6,186' MD PULL STA #6 DGLV AT 4,122' MD SET STA #6 LGLV AT 4,122' MD PULL RHC PLUG BODY AT 9,960' MD 9/3012019 *** CONT. TO 1011119 WSR *** Daily Report of Well operations PBU 01-37 3745 psi Target 3500 psi Max applied 3850 psi MIT IA PASSED @ 3743 psi Target 3500 psi Max applied 3850 psi....... Pumped 1.2 bbls dsl down TBG to ensure B&R looked to be seated. They did. Pumped 2.2 bbls of 40* diesel down TBG to set packer. Pumped .1 bbl of diesel down TBG to reach test psi for MIT T 1st test 1st 15 min TP lost 56 psi 2nd 15 min 25 psi for a total of 81 psi in 30 min. Bleed TP down. F -protect F -line. spear in to F -line with 5 bbls of 60140 followed by 39 bbls of crude shut IGV & psi up to 1500 psi with 1.5 bbls of 60140. Pumped 4.3 bbls of diesel down IA to reach test psi. 1st test 1st 15 min IAP lost 52 psi 2nd 15 min 18 psi for a total of 70 psi in 30 min Bleed IAP down bleed back -4 bbls S- 9/30/2019 line on well on dep. Wing shut swab shut ssv shut master open casing valves open to RAN 3.70" CENT & 1.75" SAMPLE BAILER TO 10,480' SLM (bailer empty). DRIFT TO DEVIATION AT 10,780' SLM WITH 30'x 2-718" DUMMY GUNS (3.17" max od). 10/1/2019 ***JOB COMPLETE 1 READY FOR COIL*** CTU #9. 1.75" Coll Objective: Drift, RPM, Adperf MIRU CTU. RIH wl motor and 3.70" 3 -bladed junk mill. Tag @ 14155', PUH and come onlir wl motor. Work down to 14174' without seeing any motor work. Pump 20 bbI gel pill off bottom & chase OOH. 10/6/2019 ...In progress... CTU #9. 1.75" Coil ***Continue from 10106119**�' Objective: Drift, RPM, Adperf MU & RIH w/ Baker RPM. Log from TD at 14173' CTM to 9800' at 20 fpm. Log repeat pass from 10600'- 10350'. POOH. Confirm good data. Correlate to Baker MWD log dated 9-20- 2019, +20' correction. Stand by for data analysis. Receive updated pert intervals, MU & RIH wl SLB TCP 2.5" PJO guns. 10/712019 1 ... in Progress... Objective: Drift, RPM, Adperf Perforate interval: -,,13828'- 13848' w/ SLB 2.5" Power Jet Omega 9 s, 6 spf, 60* phasing. Standby for TCP personnel Perforate interval: 13864'- 13884'w/ SLB 2.5" Power Jet Omega guns, 6 spf, 60* phasing. 10/8/2019 ...In Progress... Objective: Drift, RPM, Adperf Perforate interval: 13905'- 13915'wl SLB 2.5" Power Jet Ome a uns 6 spf, 60* phasing. Standby for TCP personnel. Perforate interval 13931' -13945' wl SLB 2.5" Power Jet -Omega guns, 6 spf, 60* phasing. Cap well wl 38 bbls 60140 methanol for freeze protect. RDMO 10/9/2019 1 ... In progress... Objective: Drift, RPM, Adperf RDMO 10/10/2019 q446 ar North America - ALASKA - BP PBU 01 01-37 01-37 600292363300 Design: 01-37 Final Survey Report 25 September, 2019 Company: North America - ALASKA - BP Project PBU Site: 01 W611. 01-37 Wellbore: 01-37 Design: 01-37 BP Final Survey Report Local Coordinate Reference- Well 01-37 TVD Reference: ACTUAL KB P272 @ 86.50usft MD Reference. ACTUAL KB P272 @ 86.50usft North Reference, True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE System Datum: Mean Sea Level Map System: Alaska NAD27 State Plane Zones Using Well Reference Point Geo Datum: NAD27' OGP-Usa AK [4267`15864] Using geodetic scale factor NAD27' OGP-Usa AK I Alaska zone 4[26734'1588 - Map Zone: 5,941,932.140 usft Latitude: 70' 14'43.905 N Northing: 148° 24' 24.004 W Site Position: Easting: 697,237.600 usft Longitude: 1.50 From: Map Sint Radius: 0-000 in Grid Convergence: — — — 0.00 usft u Position Uncertainty_ f 0. _ — — — — — --- -- — — — —�f — I Wel[ ---- ` _ 01-37 5,940,437.210 usft Latitude: 70° 14'28.819 N i Well Position +N1 -S 0.00 usft Northing: 698,738.060 usft Longitude. 148° 23'41.593 W +E1 -W 0.00 usft Easting: 45.10 usft Ground Level: 38.50 usft 1 Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 01-37 Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2018 9!1!2019 16.77 80.90 57,406 Design 01-37 Audit Notes: Phase: ACTUAL Tie On Depth: 41.40 Version: Depth From (VD) *Ef-W Direction Verdeal Section: (usm (usft) (ueR) (°j a, ae J nr. 000 35.00 COMPASS 5000 1 Build SID 9/25/2019 209:14PM Page 2 Company: North America - ALASKA - BP project; PBU Site: 01 W61L 01-37 Wellbore: 01-37 Design: 01-37 Survey Program From � 50.00 1,517.06 3,828.48 10,169.60 Survey Date 9/2512019 To (usft) Survey (Wellbore) 1,423.00 Survey#1 (01-37) 3,743.79 Survey 92 (01-37) 10,093.58 Survey #3 (01-37) 14,275.00 Survey #4 (01-37) MD Inc Am TV0 Neft) GYRO -WD -SS Gyro while drilling single shots (usft) 41.40 0.00 0.00 41.40 50.00 0.06 239.84 50.00 127.00 0.04 341.22 127.00 165.00 0.11 299.19 185.00 283.00 0.11 196.91 263.00 345.00 0.26 106.96 345.00 440.00 1.50 92.27 439.96' 537.00 3.21 55.52 538.90 577.00 3.43 84.76 576.83 950.00 435 86.87 659.61 BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calcuiabon Method: Database. Well 01-37 ACTUAL KB P272 @ 86.50usR ACTUAL KB P272 @ 86.50usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Tool Name Description 631.95 GYRO -WD -SS Gyro while drilling single shots 5,940,438.393 898,754.141 1.17 MWD+IFR+MS-WOCA MWD + IFR + Multi Station Wi0 Crustal 4.91 88.40 718.45 MWD+IFR+MS-WOCA MVD + IFR + Multi Station W/O Crustal 22.02 5,940,438.639 698,758.048 MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 763.00 5.30 87.45 762.28 875.78 1.15 26.99 5,940,439.071 696,783.008 TVDSS Nl5 EAR Northing Easting (usft) DLeg (°1100usit) V. See (us'ft} (usft) (usft) (Matt) (usft) 0.00 0.00 -45.10 0.00 0.00 5,940,437.210 698,736.060 950.00 7.30 -36.50 0.00 0.00 5,940,437.208 698,736.056 0.70 0.00 40.50 0.00 -0.05 5,940,437.212 698,736.013 0.10 -0.05 78-50 0.03 -0.08 5,940,437.241 698,735.976 0.22 -0.07 176.50 -0.01 -0.19 5,940,437.194 698,735.867 0.17 -0.19 258.$0 -6.14 -0.0+4 5,940;437.089 698,738.026 0.34 -0.07 353:A8 -0,26 1.49 5,940;436.994 698,737.560 1.42 1.38 68.80 6.10 5.55 5,940,437.259 698,741.615 1.66 5.34 450.40 490.33 0.10 7.86 5,940,437.517 698,743.917 0.56 7.6.' 583.11 0.55 14.15 5,940,438.129 698,750.195 1.00 13.81 870.00 631.95 0.71 18.11 5,940,438.393 898,754.141 1.17 17.87 719.00 4.91 88.40 718.45 0.85 22.02 5,940,438.639 698,758.048 0.91 21.49 763.00 5.30 87.45 762.28 875.78 1.15 26.99 5,940,439.071 696,783.008 0.82 28.37 815.00 5.69 85.69 814.04 727.54 42.24 5,940,440.116 698,778.235 1.23 41.26 950.00 7.30 89.06 948.17 861.67 1.79 55.17 5,940,440.307 898,791.162 1.18 53,71 1,045.00 8.35 92.07 1,042.28 955.78 1.84 1,047.76 0.87 68.92 5,940,439.902 696,804.931 0.51 68.80 1,138.00 8.69 94.28 1,134.26 0.06 83.89 5,940,439.477 698,819.914 0.90 81.04 1 II. 1,233.00 9.47 92.08 1,228.07 1,141.57 99.85 5,940,439.2 72 698,835.887 0.67 98.30 1,327.00 10.10 92.40 1,320.70 1,234.20 -0.57 118.01 5,940,438.204 698,854.075 1.99 113.4 4 1 1,423.00 11.80 96.99 1,414.95 1,328.45 -2.12 138.39 5,940,436.411 698,874.481 1.67 132.499 it 1,517.06 13.38 96.13 1,506.75 1,420.25 4.45 -----------------_---_ __ _ _ - � - - - -- --- --._..._ -- COMPASS 5000.1 Build 61 9/25/2019 2:09:14PM Page 3 BP 0 by Final survey Report Local Co-ordinate Reference. Wall 01-37 Company: North America - ALASKA- BP ND Reference: ACTUAL KB P272 Q 86.50usR Project PBU MD Reference: ACTUAL KB P272 Q $6.50usft Sft. 01True North Reference' Wall: 01-37 Survey Calculation Method: Minimum Curvature ilYsllbore: 01-37 Database: EDM R5K - Alaska PROD - ANCP1 Design: 01-37 Survey Inc 7yp NDSB NIS E1W Northing Easting OLeg lush4 (°MI)OUS t} V. Sac j 4usm I_ (MD { 1 [us D1 { iii (uaftl Eustq 180.84 (-ft) 5,940,434.357 698,897.027 1.42 153.52 ' 1,Bi0.59 14.66 97.25 7,597.50 1,511.00 -7.10 185.19 5,940,430.431 898,921.483 2.15 175.88 1,705.15 15.76 703.78 1,688.75 1,602.25 -11.87 210.89 5,940,423.730 698,947.188 1.82 188.58 1,799.61 16.91 108.33 1,779.40 1,692.90 -19.04 237.14 5,940,415.257 688,973.650 0.80 221.78 1,894.24 17.51 109.90 1,869.79 1,783.29 -28.22 264.05 5,940,405.925 699,001.013 0.63 245.15 198846 17,99 111.03 1,959.53 1,873.03 -38.26 1,962.95 -49.95 293.90 5,940,395.030 699,031.158 3.42 270.96 2,083.94 21.25 711.68 2,049.45 328.58 5,940,380.272 699,066.236 4.94 300.401 2,179.81 25.58 116.55 2,137.41 2,050.97 -65.63 366.72 5,940,360.222 699,104.920 4.18 331.79 2,274.94 28.99 121.01 2,221.95 2,135.45 -86.69 379.09 5,940,353.021 699,117.484 1.04 341.79 2,304.82 28.99 121.65 2,248.09 2,161.59 -94.22 392.91 5,940,344.581 699,131.531 7.40 352.85 2,337 51 31.24 123.43 2,276.37 2,188.87 -103.05 2,302.13 2,215.63 -112.19 406.69 5,940,335.781 688,145.545 9.52 363.80 2,368.13 34.15 12$.71 421.87 5,940,325.824 699,160.887 3.10 375.77 2,400.58 34.88 124.93 2,328.85 2,242.35 -122.56 450.25 5,940,308.414 698,189.890 0.93 397.97 2,461.60 34.68 125.86 2,378:99 2,292.49 -142.72 495.63.`, 5,940,278.134 699,236,078 2.11 433.65 2,558.81 36.25 123.70 2,458':54- -2,370.04 -174'.21 542.83 a ' 5,940;246.768 699,284.067 1.13 471.31 2,651.26 36.88 122.26 2,532:40 2,445.90 -204'.83 122.67 2,607.80 2,521.30 -235.38 590.83 5,940,217.502 899,332.860 0.43 509.7 2,745.72 37.20 2,596.67 -266.60 639.93 5,940,187.588 689,382.759 1.01 549.12 2,840.94 38.13 122.24 2,683.17 688.94 5,940,158.053 699,432.562 0.22 588.481 2,934.92 37.84 122.12 2,757.19 2,670.69 -287.44 735.40 5,940,128.998 899,482.808 0.74 628.4011 3,029.33 37.84 120.98 2,831.85 2,745.15 -327.81 787.13 5,940,100.675 699,532.292 2.46 667.801 3,124.56 35.63 121.63 2,907.92 2,821.42 -357.43 122.51 2,985.25 2,898.78 -386.56 833.82 5,940,072.782 699,579.539 0.81 705.17 3,219.41 35.06 2,976.29 -417.07 879.00 5,940,043.476 699,625.701 1.74 741.10 3,314.27 35.36 125.32 3,052.79 923.57 5,940,014.006 699,671.062 0.99 778.22 3,407.87 35.26 123.72 3,139.18 3,052.68 -447.73 970.85 5,939,985.166 699,719.120 2.73 814.10 1 3,502.49 37.41 121.30 3,215.40 3,128.90 -477.83 1,021.48 5,939,855.983 689 ,770.508 1.36 855. 08 3,598.38 38.69 120.91 3,290.91 3,204.41 -508.36 35.75 122.43 3,366.14 3,279.64 -538.34 1,070.10 5,939,927.300 699,819.922 3.26 894. 31 11 3,692.88 3,407.61 3,321.11 -554.26 1,095.01 5,939,912.044 699,845.235 1.14 814.24 - ._ 2 3,743.79 35.20 122.75 COMPASS 5000.1 Build 8117 9/25/2019 2:09:14PM Pape 4 BP TJpp Final Survey Report Local Co-ordlnata reference: Well 01-37 Company: North America - ALASKA - BP TVD Reference: ACTUAL KB P272 (8 86.50usft Project. PBU MD Reference: ACTUAL KB P272 @ 86.50usft site, 01True North Reference: well: 01-37 Surrey Calculation Method: Minimum Curvature Wellbore: 01-37 Database: EDM R5K - Alaska PROD - ANCP1 Design: 01-37 $la�+aq TVD NDS$ Nis E!W Northing EasUng DLeg (usft} i" 1700usitj V. Sec (usR) MD (usiq C! { 1 (usft) lusft} (unit} (usftj 1,135.96 luaR} 5,939,886.745 898,886.870 0.20 946.97 3,828.48 35.04 122.84 3,476.88 3,390.38 -580.65 1,165.11 5,939,86$.814 889,916.503 1.34 970.28 3,888.23 35.82 122.54 3,525.57 3,439.07 -599.35 1,212.48 5,939,840.675 699,964.622 0.88 1,008.43 3 35.88 121.12 3,602.73 3,516.23 -628.75 ,983.42 3,879.66 3,593.16 -657.41 1,260.16 5,939,813.264 700,013.048 0.14 1,047.07 4,078.38 35.87 120.89 3,669.44 -685.99 1,307.27 5,939,785.983 700,060.888 0.44 1,OB5.18I 4,172.46 35.81 121.59 3,755.94 1,354.35 5,839,758.153 700,108.720 0.13 1,123.14 4,286.97 35.88 121.78 3,832.56 3,746.06 -715.05 1,401.94 5,939,730.728 700,157.046 O.86 1,161.88 4,361.88 35.82 120.39 3,909.50 3,823.00 743.74 1,449.59 5,939,704.378 700,205.388 0.37 1,200.55 4,455.92 35.87 119.81 3,985.73 3,899.23 -771.36 1,239.78 1 119.74 4,062.19 3,975.89 -798.78 1,497.53 5,939,678.224 700,254.043 0.07 4,550.24 35.82 4,051,93 -826.09 1,545.34 5,939,852.183 700,302.552 0.03 11278.87 4,644.28 35.85 5 119.72 4,138.43 1,593.85 5,939,626.432 700,351.757 0.71 1,318.73 4,739.11 35.8 118.57 4,215.29 4,128.79 -853.14 1,642.29 5,938,801.587 700,400.888 0.28 1,358.761 4,833.08 35.85 118.12 4,291.45 4,204.95 -879.27 1,990.74 5,939;575:828 700,450.008 1.30 1,388.55 4,927.90 35.79 120.23 4,368.34: X1,281.8.4 -906.32 122.32 4,445.02 4,358.52 -935'.06 1;738.06 k,.. u 5,939;548.343 700,486.066 1,30 1,436.8211 5,022.46 35.88 4,520.68 4,434.19 -984.54 1,784.08 5,939,520.092 700,544.854 0.40 1,473.65 5,115.83 35.80 122.95 4,511.05 -994.56 1,830.65 5,939,491.314 700,592.187 0.18 1,510.8 5,210.57 35.77 122.67 4,597.55 -1,024.10 1,876.95 5,939,462.997 700,639.247 1.05 1,547.93 5,305.88 34.78 122.42 4,675.19 4,588.69 1,921.95 5,939,435.017 700,685.000 0.67 1,583.65 5,399.86 34.65 123.50 4,752.61 4,666.11 -1,053.28 122.56 4,830.56 4,744.06 -1,082.57 1,966.99 5,939,406.932 700,730.793 0.59 1,619.77 5,494.53 34.50 4,908.57 4,822.07 -1,111.29 2,012.28 5,839,379.415 700,776.828 0.22 1,658.09 5,589.20 34.52 122.20 4,986.19 4,899.69 -1,139.46 2,057.66 5,939,352.456 700,822.927 0.45 1,892.63 1 5,683.42 34.54 121.48 4,878.11 1,167.52 2,103.74 5,939,325.622 700,869.735 0.15 1,729.891 5,778.81 34.52 121.21 5,064.61 -1,195.63 2,149.80 5,939,298.725 700,916.314 0.38 1,786.90 5,873.53 34.52 121.82 5,142.82 5,056.32 1,803.28 122.42 5,220.54 5,134.04 -1,224.08 2,194.87 5,939,271.508 700,962.319 0.36 j 5,967.86 34.52 5,211.47 -1,252.88 2,239.66 5,939,243.874 701,007.842 0.42 1,839.07 1 6,061.84 34.52 123.12 5,297.97 2,284.77 5,939,215.541 701,053.717 0.14 1,875.00 � 6,157.10 34.43 123.30 5,376.50 5,290.00 -1,282.42 2,329.77 5,939,188.519 701,099.446 1.46 1,911-17 6,251.09 34.41 120.88 5,454.04 5,367.54 -1,310.64 COMPASS 5000.1 Build 81D 9/25/2099 2.09:14PM Page 5 BP TJby Final Survey Report Company: North America - ALASKA - BP Project: PBU LMNI Co-otduro4e TVD ReftranCG-. MD Reference: RolErence; well 01-37 ACTUAL KB P272 C 86.50usft ACTUAL KB P272 @ 86.50usfl SRO: 01 North Reference: True Well: 01-37 Wellbore: 01-37 Survey calculation Method: Database: Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Design: 01-37 Survey MD (usft) 1 6,345.92 6,440.06 8,534.88 6,829.44 6,724.66 6,819.71 6,913.65 7,008.83 7,103.37 7,198.12 7,292.38 7,387.31 7,481.55 7,575.75 7,670.30 7,764.98 7,859.52 7,954.23 8,048.66 8,142.42 8,237.54 8,332.23 8,427.22 8,521.10 8,615.76 8,710.94 8,805.39 1(') ( 1 34.45 34.55 34.68 34.70 34.66 34.62 34.63 34.68 34.73 34.56 34.57 34.fi2 34.67 34.64 34.62 34.70 34.65 34.62 34.40 34.42 34.55 33.96 33.35 33.24 33.83 33.87 32.49 121.03 122.43 121.50 120.44 119.38 119.79 119.29 120.03 121.04 122.82 123.72 123.38 123.78 123.32 122.90 123.33 123.00 123.07 122.35 121.66 121.04 120.88 120.80 120.52 119.60 119.61 115.70 TVD (usft) 5,532.26 5,609.84 5,687.88 5,765.63 5,843.94 5,922.14 5,998.44 6,077.73 6,155.46 8,233.41 6,311.01 6,389.18 6,466.71 6,544.19 6,621.99 6,699.87 6,777.62 6,855.55 6,933.36 7,010.71 7,089.12 7,187.38 7,246.45 7,324.92 7,403.83 7,482.87 7,561.93 TVD83 (usft) 5,445.76 5,523.34 5,601.38 5,679.13 5,757.44 5,835.64 5,912.94 5,991.23 6,088.98 6,146.91 6,224.51 6,302.68 6,380.21 8,457.69 8,535.49 6,613.37 6,691.12 8,769.05 6,846.88 6,924.21 7,002.62 7,080.88 7,159.95 7,238.42 7,317.33 7,396.37 7,475.43 N18 Waft) -1,338.21 -1,366.26 -1,394.77 -1,422.45 -1,449.48 -1,476.15 -1,502.47 -1,529.25 -1,556.60 -1,585.08 -1,614.41 -1,644.21 1,873'.83 -1,708.43 1,732.78 -1,762.19 -1,791.62 -1,820.96 -1,849.87 -1,877.95 -1,905.97 -1,933.39 -1,960.38 -1,986.70 -2,012.93 -2,039.12 -2,063.13 eft Weft) 2,375.75 2,421.10 2,466.80 2,512.94 2,559.80 2,608.89 2,653.32 2,700.35 2,746.72 2,792.43 2,837.13 2,882.06 2;926.70 2;971.34 3,015.35 3,061.45 3,106.47 3,151.60 3,196.61 3,241.54 3,287.53 3,333.24 3,378.44 3,422.75 3,467.98 3,514.08 3,559.83 Northing (USM 5,939,162.164 5,939,135.329 5,939,108.031 5,939,081.566 5,939,055.800 5,939,030.375 5,939,005.293 5,938,979.761 5,938,953.648 5,938,928.380 5,938,898.241 5,938,869.643 5,938,841.208 5,938;812.801 5,938,784.649 5,938,756.433 5,938,728.208 5,938,700.065 5,938,672.353 5,938,645.467 5,938,618.672 5,938,592.489 5,938,588.884 5,938,541.544 5,938,516.517 5,938,491.552 5,938,468.759 ung DLeg (usft} (° H6ousft) 701,146.134 701,192.204 701,238.833 701,285.488 701,333.142 701,380.811 701,427.924 701,475.842 701,522.704 701,569.148 701,614.604 701,660.300 701,705.702 701,751.111 701,796.872 7Q1,842.728 701,888.509 701,934.391 701,980.149 702,025.802 702,072.515 702,118.924 702,164.816 702,209.800 702,255.711 702,302.479 702,348.841 0.10 6.85 0.57 0.64 0.63 0.25 0.30 0.45 0.61 1.08 0.54 0.21 0.24 0.27 0.25 0.2 0.251 0.05 0.49 0.42 0.39 0.63 0.64 0.16 0.86 0.04 2.70 V. Sec (1-M 1,948.45 1,984.99 2,021.75 2,059.15 2,087.52 2,136.00 2,174.05 2,212.54 2,250.25 2,287.03 2,322.61 2,358.30 2,393.75 2,429.22 2,485.09 2,501.0 2,538.92 2,572.91 2,608.91 2,845.04 2,682.21 2,719.26 2,755.94 2,791.92 2,828.83 2,866.58 2,904.5511 - - - - - - - - - - - - COMPASS 5000 1 Build 610 9/25/2019 2:09:14PM Page 6 BP by Final Survey Report Local Co -ordinals Reference: Well 01-37 Company: North America - ALASKA - BP TVD Re%mnco: ACTUAL KB P272 @ 86.50usft Pmjed: PBUlIAI] Reference: ACTUAL KB P272 @ 86.50usft sem; 01True North Reference: Well: 01-37 Survey Caiculatlon Method: Minimum Curvature Wellbore: 01-37 Ueftbase: EDM RSK - Alaska PROD - ANCP1 Design. 01-37 Survey NIS E/W Northing Easting DLeg V. Sec MD Azi Inc{") TVO 7VD55 (waft) NOR) (Haft) IuefU lusiq 1 °1100MM (USM (usft) (usft) 7,555.33 -2,082.87 3,606.78 5,938,450.283 702,396.293 3.28 2,944.7E 8,900.15 32.61 109.92 7,641.83 3,855.50 5,938,437.256 702,445.375 4 07 2,988.18 8,994.60 32.55 102.78 7,721.44 7,634.94 -2,097.16 3,705.34 5,938,429.770 702,495.428 3.16 3,034.02 9,088.85 32.83 97.26 7,800.70 7,714.20 -2,105.97 3,757.01 5,938,427.314 702,547.170 3.40 3,082.94 9,184.94 32.55 91.19 7,881.85 7,795.35 -2,109.79 7,961.13 7,874.63 -2,108.36 3,808.05 5,938,430.085 702,598.153 3.23 3,132.61 9279,25 33.08 85.65 7,953.23 -2,102.11 3,859.56 5,938,437.694 702,649.488 3.09 3,183.99 9,373.45 33.84 80.56 8,039.73 3,911.49 5,938,449.821 702,701.106 2.73 3,236.93 9,468.07 34.38 76.05 8,118.09 8,031.59 -2,091.35 -2,078.09 3,962.84 5,936,465.419 702,752.030 3.15 3,290.47 9,582.39 34.89 70.90 8,195.71 8,109.21 -2,057.96 4,013.95 5,938,485.891 702,802.648 0.57 3,344.54 9,856.96 35.10 70.04 8,273.18 8,186.68 0.49 3,399.06 69.89 8,350.39 8,263.89 -2,039.21 4,065.37 5,938,505.989 702,853.548 9,751.60 35.58 8,340.65 -2,020.01 4,116.84 5,938,526.538 702,904.496 0.43 3,453.75 9845,99 35.63 69.20 8,427.15 4,134.15 5,938,533.609 702,921.624 0.44 3,472.18 9,877.80 35.63 68.96 8,453.00 8,356.50 -2,013.40 -1,993.73 4;184.83: 5,938,55CS00 702,971.788 0.21 3,526.22 9,971.06 08 35.88 68.63 8,528.78 8,442.,48 -1 OB 4,236.04' 5,938,576.619 703,022.407 0.76 3,581.04 10,065.77 35. 67.39 8,605,72 8,519.22 ,873 1.59 3,597. 18 67.07 8,628.26 8,541.76 -1,966.75 4,251.06 5,938,589.918 703,037.256 10,093.58 36.06 8,601.85 -1,948.63 4,293.94 5,938,602.562 703,079.639 4.49 2 3,643.5 10,169.60 39.47 67.11 8,688.35 8,626.18 -1,940.73 4,312.81 5,938,810.951 703,098.298 3.79 3,683.5 10,201.39 40.65 67.49 8,712.68 -1,933.14 4,331.49 5,938,819.034 703,116.767 7.12 6 3,683.58 10,231.70 42.75 68.24 8,735.31 8,648.81 4,354.38 5,938,628.533 703,139.410 11.81 3,707.97 10,286.57 46.81 89.23 8,760.06 8,673.56 -1,924.24 6,779.51 8,693.01 -1,918.62 4,374.73 5,938,638.685 703,159.557 .44 3,729.87 10,295.74 49.54 69.72 8,711.91 -1,908.71 4,396.06 5,938,645.162 703,180.667 4 4.99 3,752.26 10,325.32 51.01 68.55 8,798.41 B,732.74 -1,899.72 4,420.61 5,938,854.794 703,204.973 3.10 3,778.30 10,358.75 51.90 70.23 8,819.24 8,751.74 -1,891.41 4,444.19 5,938,663.718 703,228.321 5.77 3,803.221 10,390.15 53.62 70.95 8,838.24 8,769.67 -1,883.25 4,468.06 5,938,672.507 703,251.964 6.36 3,828.39 10,421.10 55.57 71.28 6,856.17 j 58.40 71.28 8,873.67 8,787.17 -1,874.61 4,493.56 5,938,681.617 703,277.224 8.81 3,855.28 3,882.76 1 10,453.21 8,889.93 8,803.43 -1,865.68 4,519.53 5,938,691.431 703,303.058 6.68 10,485.2 80.51 70.92 8,817.50 -1,857.31 4,544.01 5,938,700.433 703 ,327.200 5.88 3,908.47 10,514.58 62.22 71.20 8,904.00 COMPASS 5000.1 Build 81D 9!16/2019 2:09:14PM Page 7 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 01-37 Project PBU TVD Reference: ACTUAL KB P272 @ 86.50usft Site; 01 MD Reference: ACTUAL KB P272 fM 86.50usft Well: 01-37 North Reference. True Wellbore: 01-37 Survey Calculation Method., Minimum Curvature Design, 01-37 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AzI TVD TVDSS NIS E1W Northing Easting DLeg V. Sec (usfl) i) [°I (waft) (usft) (waft) (usft) [vette (usft) (°If6ouaft) (asft) 10,547.72 63.94 71.63 8,919.01 8,832.51 -1,847.90 4,572.02 5,938,710.584 703,354.948 5.32 3,937.9e 10,579.31 65.91 72.86 8,932.39 8,845.89 -1,839.17 4,599.26 5,938,720.021 703,381.956 7.16 3,986.53 10,609.75 67.52 72.44 8,944.43 8,857.93 -1,830.83 4,825.96 5,938,729.083 703,408.421 5.44 3,994.48 10,643.51 88.99 72.49 8,956.93 8,870.43 -1,821.39 4,555.85 5,938,739.291 703,438.051 4.36 4,025.80 10,674.98 69.25 73.49 8,968.15 8,B81.65 -1,812.79 4,683.97 5,938,748.630 703,465.930 3.08 4,055.18 10,704.87 69.82 72.88 6,978.60 8,892.10 -1,804.69 4,710.77 5,938,757.435 703,492.511 2.70 4,083.17 10,736.57 71.73 72.27 8,989.70 8,903.20 -1,795.16 4,741.13 5,838,767.761 703,522.606 5.92 4,114.96 10,768.45 73.86 72.04 8,998.54 8,912.04 -1,786.41 4,768.30 5,938,777.220 703,549.533 7.17 4,143.47 10,799.36 75.99 71.71 9,006.57 8,920.07 -1,777.13 4,796.86 5,938,787.249 703,577.640 6.97 4,173.27 10,832.96 78.20 70.43 9,014.08 8,927.58 -1,766.50 4,827.84 5,938,798.887 703,606.324 7.55 4,205.94 10,864.91 79.87 68.65 9,020.15 8,933.65 -1,755.79 4,857.12 5,938,810.167 703,637.511 5.75 4,237.19 10,894.04 81.88 69.58 9,024.77 8,938.27 -1,745.78 4,884.08 5,938,820.892 703,664.195 6.90 4,265.82 10,929.45 84.68 70.92 9,028.92 8,942.42 -1,73 .89 4,917.17 5,938,831640 703,696.963 8.75 4,300.88 10,959.08 86.01 70.27 9,031.32 8,944.82 -1,723.08 4;945.03 1. 5,93%.644.182 703,724.547 4.99 4,330.30 10,989.27 87.84 71.71 9,032.94 B,946.44 -1,714.26 4,973.53 ' 5,938,854.748 703,752.777 7.71 4,360.38 11,022.34 89.77 71.59 9,033.63 8,947.13 -1,703.88 5,004.92 5,838,865.953 703,783.880 5.84 4,393.3r 11,053,37 91.55 70.88 9,033.27 8,946.77 -1,693.93 5,034.30 5,938,876.678 703,812.992 6.30 4,424.34 11,083.80 92.45 70.46 9,032.21 8,945.71 -1,683.86 5,063.00 5,938,887.497 703,841.411 3.26 4,454.67 11,116.52 94.05 71.21 9,030.38 8,943.86 -1,673.14 5,083.88 5,938,899.030 703,871.972 5.40 4,487.25 11,148.15 94.28 70.16 9,028.06 8,941.56 -1,652.70 5,123.63 5,938,910.245 703,991.455 3.39 4,518.70 11,177.86 94.58 70.38 9,025.76 8,939.26 -1,652.70 5,151.51 5,938,920.976 703,929.063 1.25 4,548.22 11,210.41 95.04 69.85 9,023.04 8,936.54 -1,641.67 5,182.01 5,938,932.808 703,959.261 2.15 4,580.54 11,243.15 95.32 69.16 9,020.08 8,933.58 -1,630.25 5,212.55 5,938,945.024 703,989.490 2.27 4,613.00 11,272.73 95.15 69.33 9,017.12 8,930.62 -1,619.82 5,240.07 5,938,956.176 704,016.725 2.86 4,642.28 11,367.33 97.08 68.71 9,006.23 8,919.73 -1,586.18 5,327.81 5,938,992.119 704,103.542 1.18 4,735.74 11,482.29 96.99 68.93 8,994.60 8,908.10 -1,552.13 5,415.69 5,939,026.473 704,190.488 0.25 4,829.44 11,557.03 97.21 67.19 8,982.88 8,896.38 -1,517.00 5,502.89 5,939,065.883 704,276.728 1.84 4,922.76 j 9125/2019 2.09:14PM Page 8 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference, Well 01-37 Project, PBU TVD Reference: ACTUAL KB P272 Q 86.50usft Site: 01 MD Reference: ACTUAL KS P272 C 86.50usft Well, 01-37 North Reference. True Wellbore: 01-37 Survey Calculation Method: Minimum Curvature Design: 01-37 Database: EDM R51K - Alaska PROD - ANCP1 Survey MD Azl TVD TVDSS NIS EAN Northing Easting DLeg V. Sec (usft) Cf (•1 (usft) (usft) (usft) (usft) (usft) (usft) (wousft) (usm 11,651.70 97.11 67.50 8,971.09 8,884.59 -1,480.82 5,589.58 5,939,104.334 704,362.424 0.34 5,015.85 11,746.22 96.95 64.16 8,959.51 8,873.01 -1,442.42 5,675.15 5,939,144.979 704,448.950 3.51 5,108.45 11,840.81 98.99 82.36 6,948.03 8,861.53 -1,400.18 5,759.00 5,939,189.416 704,529.649 1.89 5,200.37 11,935.86 96.99 61.09 8,938.47 6,649.97 -1,355.49 5,842.08 5,939,236.278 704,611.522 1.33 5,292.19 12,030.21 96.83 56.79 8,925.11 8,638.61 -1,307.17 5,922.30 5,939,286.687 704,690.432 4.53 5,382.18 12,125.13 96.86 53.50 8,913.79 8,827.29 -1,253.32 5,999.62 5,939,342.557 704,768.307 3.44 5,470.81 12,219.55 98.93 54.03 8,902.46 8,815.96 -1,197.91 6,075.23 5,939,399.935 704,840.424 0.58 5,558.18 12,314.33 96.77 53.98 8,891.15 8,804.85 -1,142.61 6,151.37 5,939,457.226 704,915.071 0.18 5,646.04 12,409.30 96.74 49.62 8,879.98 8,793.48 -1,084.30 6,225.46 5,939,517.464 704,987.601 4.55 5,732.70 12,503.24 99.09 50.13 8,867.04 8,780.54 -1,024.34 8,296.60 5,939,579.275 705,057.131 2.55 5,816.93 12,597.92 99.03 48.15 8,852.13 8,765.63 -983.17 6,367.31 5,939,642.280 705,126.201 2.07 5,901.07 12,692.02 99.06 46.73 8,837.34 8,750.84 -900.32 6,435.76 5,939,706.911 705,192.964 1.49 5,983.45 12,786.92 99.10 45.14 8,822.36 0,735.06 -835.15 6,003.10 5,939;773:831 705,258.553 1.65 6,055.36 12,882.03 99.00 43.52 8,801.40 -8,720.90 -76%96 61668.71. 5,939;842-.720 705,322.387 1.69 6,146.14 12,976.04 99.01 42.28 8,792.88 8,706.18 -699.95 601.93 5,939;91,2:575 705,383.773 1.30 6,224.79 13,070.77 98.75 41.74 8,778.06 8,691.56 -630.40 6,694.57 5,939,983.541 705,444.553 0.63 6,303.3f 13,185.51 98.41 41.42 8,765.57 8,679.07 -560.16 6,756.89 5,940,055.401 705,504.998 2.49 6,381.68 13,260.86 93.39 41.88 8,757.42 8,670.92 -489.07 8,819.9() 5,940,128.121 705,566.103 3.18 6,460.93 13,356.13 89.47 43.36 8,755.04 8,668.54 418.89 6,884.25 5,940,199.968 705,628.581 4.48 6,541.26 13,450.45 85.45 42.55 8,759.22 8,672.72 -349.94 8,948.45 5,940,270.582 705,690.934 4.35 6,621.11 13,545.56 82.10 42.21 8,789.54 8,683.04 -280.11 7,012.17 5,940,342.065 705,752.789 3.54 6,700.74 13,640.84 78.12 40.85 8,785.90 8,899.40 -209.86 7,074.39 5,940,413.924 705,813.136 4.41 6,779.02 13,735.43 74.29 40.42 8,808.45 6,721.95 -140.17 7,134.21 5,940,485.169 705,871.089 4.07 6,854.84 13,830.32 70.94 40.70 8,836.80 8,750.30 -71.38 7,193,08 5,940,555.482 705,928.125 3.54 8,929.51 13,924.58 69.34 40.91 8,868.82 8,782.32 -4.28 7,251.01 5,940,624.088 705,984.264 1.71 7,002.83 14,019.48 69.32 40.50 8,902.32 8,815.82 63.03 7,308.92 5,940,692.896 706,040.373 0.40 7,076.19 14,11478 69.26 40.35 8,938.02 8,849.52 130.89 7,366.72 5,940,762.252 706,096,365 0.16 7,149.59 9125/2019 2:09,14PM Page 9 COMPASS 5000 1 Build BID 9125/2019 2:09-14PM Page 10 COMPASS 5000.1 Build 810 BP 0 by Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 01-37 Project: PBU TVD Reference: ACTUAL KB P272 @ 86.50usft Site: 01 MD Reference: ACTUAL KB P272 @ 86.50usft Well: 01-37 North Reference: True Wellbore: 01-37 Survey Calculation Method: Minimum Curvature Design: 01-37 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD MOSS NIS E/W Northing Easting DLeg V. Sec (uaft) (1) 11) (usft) (uam (usft) (usft) Nam (waft} (^1100usft) (usft) 14,209.43 89.25 41.37 8,968.54 8,883.04 197.84 7,424.63 5,940,830.695 706,152.483 1.01 7,222.84 14,241.47 89.29 41.92 8,980.88 8,694.39 220.23 7,444.54 5,940,853.603 706,171.797 1.61 7,247.87 14,275.00 69.29 41.82 8,982.74 8,908.24 243.57 7,465.49 5,940,877.483 706,192.127 0.00 7,274.15 Projection to TO 9125/2019 2:09-14PM Page 10 COMPASS 5000.1 Build 810 1-Ww1oT—Nmh WELLBORE DETAILS: D1-37 RFF9gy0EiW0RNAn9N Project PBU ma.&w:m:1a ---� $169: 01 01-37 cuV.(dW µElRefe,enox ACTUAL KBP27Nulh P My:rticFieY WN ,IVq)Rebmm SV -(0J KB4O9DE) 5.SOveR hn6� Willi: 01-37 ::574!01 8ecla Da*F4ur�e AcTuOAOR,072@ by Wellborm 0137 Ptirm 0 NO wellboreda181sav „�pmy,nmfte,n9ivaiKaM72�e9,5pa9 A0t & 01-P 9nm:9ooupm Tie 9n MD: 41.40 Cekumfion MgYnd: MNnun Cu ve9w AOGCC - Offsets within 500ft East rig (250 uslVln) ++11 { U o J J J Jp c a o 0p V J J Jo Jo J V O u O p CO N 0 N V O yN1 �p tN/r pO flr o N Q O o 0 N 0 N {T e a p p O p o r 9 9 N L.. _ 3000 594300 - ._ _...101-04p II l 2759 594275 _. - - _ - ftp, 1 09 r q 544250 2259 594225 oo ` I ` _ � _ .. 2009 594299 - ofti ._ 1 �p o 594175 - ' $ 0 � : - �. m1.1�4A .. _ .. � •I �" �. % I .._ - - - - -. �I � I ' .. m . � � LL al � � �I � 5941759 85070 "O 1 c o _ ��947500 o 1250 594125 - - - - -woo- 594109 - p T_. - ��. v r - l �3B 5641000 0 I 8 _ _ _ _ _ o. __ ® If ...0 50 _ -�- t 0, . 5 _ _ 01-37 5940750 59407 01- 1 - - 5940500 594050 o � _ L&25A 4 090 ... C 5939750 M p O 1.3975 R m y o 5339593 593659 o - -- I 01 549 , , o I �-_C - I ' � I 4 031�A , o 0.1... 5939w9 P�1v I g� o moo- ' . L.. _ } : _ �" ; ` � o'er r o I 759 5939 . ..... _ ... .I O - 012 I -u�• � i l , � � I � 4 ,- h� .I � I _ I ... E i I - 9500 593850 - ... D, feyli .I 5995250 -, 593525 5999000 Ra 59077 - - II - .1,.01.05 l 03- B j I 101.266 ,� ; i I N � � 5937590 $9375 I el i 1 ' 39372 x a t1� s s N p mgs p p p p S p o p O C p p Easdng (250 uaRlln) by North America - ALASKA - BP PBU 01 01-37 01-37 01-37 WP10 500292363300 AOGCC Offset Well Report 25 September, 2019 Company: North America - ALASKA -BP Project; PBU Reference Site: 01 Sita Error. 0.00usft Reference Well: 01-37 Wag Error. 0.00usft Reference Wellbore 01-37 Reference Design: 01-37 WP10 Reference 01-37 WP10 BP Anticollision Report Local Co-ordinate Reference: TVO Reference: MD Reference: North Reference' Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Survey Tool Program Date 9!2512019 From NO GLOBAL FILTER: Using user defined selection & filtering criteria Filter type: Interpolation Method: MD Interval 25.00usft Error Model: Depth Range: Unlimited Scan Method: Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Survey Tool Program Date 9!2512019 From To (usft) (usft) Survey (Wellbore) 41.55 400.00 01-37 WP10 (01-37) 42.05 400.00 01-37 WP10 (01-37) 400.00 700.00 01-37 WP10 (0137) 400.00 700.00 01-37 WP10 (01-37) 700.00 1,000.00 01-37 WP10 (01-37) 700.00 1,000.00 01-37 WPI 0 (01-37) 1,000.00 1,400.00 01-37 WP10 (01-37) 1,000.00 1,400.00 01-37 WP10 (01-37) 1,400.00 3,855.00 01-37 WP10 (01-37) 1,400.00 3,855.00 01-37 WP10 (01-37) 3,855.00 10,077.00 01-37 WP10 (01-37) 3,855.00 10,077.00 01-37 WP10 (01-37) 10,077.00 14,254.36 01-37 WP10 (01-37) 10,077.00 14,254.36 01-37 WP10 (01-37) Well 01-37 PLAN KB - P272 88.65usft PLAN KB - P272 86.65usft True Minimum Curvature 1.00 sigma EDM R51K- Alaska PROD -ANCP1 Offset Datum ISCWSA Tray. Cylinder North Elliptical Conic Tool Name Descriptlon BLIND Blind drilling GYD-GC-SS Gyrodata gyro single shots BLIND Blind drilling GYD-GC-SS Gyrodats gyro single shots BLIND Blind drilling GYD-GC-SS Gyrodata gyro single shots BLIND Blind drilling GYD-GC-SS Gyrodata gyro single shots MyyD MWD - Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD - Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal IVWD MWD - Standard MWD+IFR+MS-WOCA MWD + lFR + Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Depth Depth Distance Site Name {usft) (usft} {uaft} offeet Well - Wellbore - Design 01 998. 875.00 479.80 01-01A-01-OIA-01-01A 998.862 2 975.00 479.80 01 -01A -01-0113-01-01B 982.88 875.00 304.04 01-02 - 01-02 - 01-02 984.85 975.00 183.37 01-03 - 01-03 - 0i-03 994.93 875.00 183.60 01-03 - 01-03A- 01-03A 985.99 975.00 88.47 01-04 - 01-04 - 01-04 985.99 875.00 6.47 01-04 - 01-D4A- 01-D4A 985.19 1,005.00 66.95 8 01-04 - 01-04B - 01-04B 988.37 875.00 80.47 01-05 - 01-05 - 01-05 993.54 975.00 0.53 01-05 - 01-05B - 01-05B 988.37 975.00 6 01-05 - 01-OSPB1 - 01-05PB1 5,194.13 5,400.00 3997.27.2 3 01-09 - 01-09 - 01-09 5,199.43 5,400.00 397.41 01-09 - 01-09A- 01-09A 397.92 400.00 152.41 01-38 - 01-36 - 01-38 400.84 400.00 150.31 01-36 - 01-36 - 01-35 WP16 03 9/2&2O19 2-25.07PM Page 2 of 2 COMR4SS 5000.1 Build BID Common Well Name: 01-371 OH Project: PBU -_— Event Type: DAL- ONSHORE (DON) Contractor: PARKER DRILLING CO. BPUOI: USA00006556 Job type: Primary Cement Company: SCHLUMBERGER Cemented String: SURFACE CASING c menong ROMA Report no.: 1 Report date: 9!9!2019 T-- — -- Spud Date7ime: 915/2019 Site_01----- r------- �+—— ----- Start Date: 9/3/2019 1 End Date: 812012019 I AFE NO.. Rig NamelNo.: PARKER 272 Rig Release: 912712019 1 H-S4DWOOt9FK-EX-01-DN-(7,293,574.00) (7,293,574.00 ) Active datum: ACTUAL Kia P272 @J86.5ft (above Mean See Level) Job end dateftime: 91812019 3:30AM Cement job start dateltime: 91912019 12:01AM Cementer. BRUCE PETERS String Size: 10.750 (in) . String Set TMD: 3,788.2 (ft) Hole Size: 13.500 (in) Pipe Movement: RECIPROCATING Rotating Torque (initlavglmax): (ft-lbf) Rotating Time (Start -End): RPM: SPM: Stroke Length: 15.00 (ft) Reciprocating Time (Start -End): 12:01:00 am - 2:30:00 am Recip Drag UplDown: - (kip) Slurry Type: SPACER10.00 Description: MUD PUSH Il Density: (ppg) Purpose: SPACER Class: Excess: Mix Method: Yield: Mix Water Ratio: Excess Slurry Volume: Density Measured by: DENSOMETER 0.0 (bbl) h+ Sacks Used: Water Volume: Slurry Volume: 100.0 (bbl) Excess Measured From: Other Volume:Viscosity: Total Vol in Well: PV: 12.00 (cp) YP: 18.000 (Ibf1100ft� 0.00 (stgt) Density: 9.05 (ppg) Mud Type: Gels 10 Sec: 5.000 (Ibf1100ft2) Gels 10 Min: 7 D00 (1bf7100ftz) Slurry Type: CEMENT11.00(ppg) LITE Description: LEAD SLURRY Density: Purpose: PRIMARY Class: 6.677 (gallsk94) Excess: 350.00 (4�a) Mix Method: ON -THE -FLY Yield: 1.9100 (ftlsk) Mix Water Ratio: Excess Slurry Volume: 481.0 (bbl) Density Measured by: DENSOMETER Sacks Used: 1,818.00 (941b sacks) Water Volume: 289.0 (bbl) 618.5 (bbl) Excess Measured Fromi EST. GAUGE HOLE Other Volume: Total Vol in Well: Slurry Volume: PV: 12.00 (op) YP: 18.000 (Ibf110DR� Vlscasily: 0.00 (slgt) Density: 9.05 (ppg) Mud Type: Gels 10 Sec: 5.000 (lbf1100tt°) Gels 10 Min: 7.000 (Ibf1100ft2) Concentration Unit Name Type Amount Units 0.050 GALISX D -AIR 3000L ANTIFOAM AGENT o.060 GAusx 0185 DISPERSANT 0.050 GAUSX D177 RETARDER Printed 11/4/2019 2:24:19PM Common Well Name. 01-37 ! OH - Project: PBU Event Type. DRL- ONSHORE (DON) Contractor: PARKER DRILLING CO. BPUOL• USA00006556 Thick time Thick (hr) temp. (°F) 6.221 Slurry Type: Purpose: Yield: Sacks Used: Other Volume: Mud Type: Gels 10 Sec: D047 D065 0167 Free water Free water (%) temp. (°F) 0.00 80.00 CEMENT PRIMARY 1. 1600 (ft'!sk) 258.50 (941b sacks) 5.000 (Ibf1100ft2) Name Thick time Thick (hr) temp. (°F) 4.521 68.00 Nor4i i i a = AtAgkk-16P Cen rlfting Report- - - �` r . Report no.: 1 Report date: 9!912019 J Site 01 Spud Date/Tims: 9/5/2018 - -I Start Date: 813!2 - End Date: 8l20l2D19 7 AFE No.: H-S4DW0019FK F -X -DI -DN- (7,293,574.00 ) Rig Name/No.: PARKER 272 Rig Release: 9122/2019 - - - - - - - _ - _ - �— t Active datum: ACTUAL KB P272 @86.51t (above Mean Sea Level) :w Fluid loss Fluid loss Fluid loss Comp Camp Comp Comp Comp Strength Comp Strength (c c130min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (Psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) .- 1-1 !mini Free water Free water N temp. (°F) 0.00 80.00 Printed 11/4/2019 2:24:19PM lows Fluid loss Fluid loss Fluid loss Comp G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Class: Mix Water Ratio: 5.078 (ga11sk94) Excess: 40.00(%) Mix Method: ON -THE -FLY (IF) 31.3 (bbl) Excess Slurry Volume: 15.3 (bbl) Density Measured by: DENSOMETER Water Volume: min)(psi) 53.4 (bbl) Excess Measured From: EST. GAUGE HOLE Total Vol in Well: 70.0 68.00 Slurry Volume: 9.05 (ppg) PV: 12-00 (cp) YP: 18.000 (IM1100ft2) Viscosity: 0.00 (s/qt) Density: Geis 10 Min: 7.000 (lbf/100ft2) A - Units Concentration Unit Type Amount 0.020 GAusx ANTIFOAMAGENT . 0.300 95 SWOC DISPERSANT 0.400 % BWOC FLUID LOSS Free water Free water N temp. (°F) 0.00 80.00 Printed 11/4/2019 2:24:19PM lows Fluid loss Fluid loss Fluid loss Comp Comp Camp Comp Comp Strength Strength Time Pressure 2 Comp Strength Temperature 2 (cc130min) temp. press. Strength Strength Pressure 1 Strength Temperature 1 2 (psi) (IF) (°F) (psi) Time 1 min)(psi) °F) min 70.0 68.00 mv��Lll Common Well Name: 01-3710H Project: PBU -- — _ Event Type DRL- ONSHORE (DON) Contractor. PARKER DRILLING CO. BPUOI: USA00006556 tage Stage Type no. 1 PRIMARY CEMENT Fluid pumped AMMM ; AtASCA'- ' 1C8'mpting Report - I Report date: 9/9/2019 Site: 01 -- — — -TSpud DatelTime: 915/2019 , — -- — --- End Date: 9120!2019 AFE No.: Start Date: 9!3!2019 1 Rig NamofNo.: PARKER 272 1 Rig Release: 9/22/2019 1 H-S4DW0019FK EX D1 -DN- (7,293,574.00) -- Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Returns Circulate Cmt Val to Total Annuiar Est. Top Est. Bottom Mud Circ. Mud Cir,. Top Bottom Plug Pressure (ft) (ft) Rate (gpm) Press. Plug (psi) Plug Bumped Bumped (psi) Float Pressure Held Heid (min) Prior (hr) Surface (bbl) Mud Lost (bbl) Flow After 0.0 3,798.0 Shoe Test Y Y Y Y 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: Positive Test (ppg) Positive Test Tool: N Volume Avg. Pumped Disp. (bbl) Rate Max DiSlurryTop Rate (bbvmin) Slurry TMD (ft) Slurry Base Start Mix Cmt Start Slurry TMD Pmp (ft) Pumping end dateltime Start Disp Foam Gas Type job Gas Vol Used (s�} BH circ. temp. Bh static temp. CEMENT 10-314" SURFACE CASING AS FOLLOWS: PUMP 100 BBLS OF 10.0 PPG MUDPUSH II SPACER AT 8 BPM, 125 PSI UN -STING VOLANTAND LAUNCH BOTTOM PLUG PUMP 618.5 BELS (1818 SKS) OF 11.0 PPG LITECRETE LEAD AT 8 BPM, EXCESS VOLUME 35D46 (YIELD 1.91 CU.FTISK) - BOTTOM PLUG LANDED AT 376 BBLS OF LEAD PUMPED, SHEARED AT 800 PSI. RECIPROCATED PIPE 15' AT SURFACE WHILE PUMPING LEAD: SIGNIFICANT INCREASE IN DRAG AT 575 BBLS INTO LEAD. STOPPED RECIPROCATING AND LANDED ON THE RING AT 600 BBLS INTO LEAD CEMENT. - STOP PUMPING LEAD AND SWITCH TO TAIL WITH MUDPUSH RETURNS TO SURFACE PUMP 53.4 BBLS (256 SKS) OF 15.8 PPG CLASS G TAIL AT 6 BPM, EXCESS VOLUME 40%. (YIELD 1.16 CU.FTISK) UN -STING VOLANTAND KICK OUTTOP PLUG WITH 10 BBLS OF WATER FROM CEMENTERS Printed 11/412019 2:24:19PM Liner Top Test Casing Test Shoe Test (ft} Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: Positive Test (ppg) Positive Test Tool: N Time: 30 (min) Tool: N Negative Test: (ppg) Negative Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: test: (hr) Hours Before Start: Time before Cml Found on Tool: N Interpretation Summary Log/Survey Evaluation 0.0 (ft) Cement Top: CBL Run: N How Determined: VISUAL CHECK Under Pressure: (Psi) TOC Sufficient: Y Bond Quality: Job Rating: EXCELLENT CET Run: N If Unsuccessful, Detection indicator: Bond Quality: Remedial Cement Required: N Temp Survey: N How Determined: Hrs Prior to Log: 17— (hr) CEMENT 10-314" SURFACE CASING AS FOLLOWS: PUMP 100 BBLS OF 10.0 PPG MUDPUSH II SPACER AT 8 BPM, 125 PSI UN -STING VOLANTAND LAUNCH BOTTOM PLUG PUMP 618.5 BELS (1818 SKS) OF 11.0 PPG LITECRETE LEAD AT 8 BPM, EXCESS VOLUME 35D46 (YIELD 1.91 CU.FTISK) - BOTTOM PLUG LANDED AT 376 BBLS OF LEAD PUMPED, SHEARED AT 800 PSI. RECIPROCATED PIPE 15' AT SURFACE WHILE PUMPING LEAD: SIGNIFICANT INCREASE IN DRAG AT 575 BBLS INTO LEAD. STOPPED RECIPROCATING AND LANDED ON THE RING AT 600 BBLS INTO LEAD CEMENT. - STOP PUMPING LEAD AND SWITCH TO TAIL WITH MUDPUSH RETURNS TO SURFACE PUMP 53.4 BBLS (256 SKS) OF 15.8 PPG CLASS G TAIL AT 6 BPM, EXCESS VOLUME 40%. (YIELD 1.16 CU.FTISK) UN -STING VOLANTAND KICK OUTTOP PLUG WITH 10 BBLS OF WATER FROM CEMENTERS Printed 11/412019 2:24:19PM Common Well Name: 01-371 OH Project: PBU _ _ Event7ype: DRL-ONSHORE (DON) Contractor: PARKER DRILLING CO- BPUOI: USA00006556 Site: 01 ---- Start Dale: 9!3!2019 End Date: 9/20/2019 Rig Name/No.: PARKER 272 Rig Release: 9!2212019 F Alive datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.0 PPG MAXDRIL PER SCHLUMBERGER CEMENTICS PROGRAM - 261 BBLS DISPLACED AT 10 BPM: ICP 350 PSI (36% RETURN FLOW), FCP 780 PSI (44% RETURN FLOW) 73 BBLS DISPLACED AT 7 BPM: ICP 640 PSI (38% RETURN FLOW), FCP 847 PSI (28% RETURN FLOW) REDUCE RATE TO 3 BPM PRIOR TO PLUG SUMP: FINAL CIRCULATING PRESSURE 660 PSI - BUMP PLUG AND INCREASE PRESSURE TO 1350 PSI AND HOLD FOR 5 MIN -BLEED OFF PRESSURE AND CHECK FLOATS: HOLDING TOTAL DISPLACEMENT VOLUME 344.1 BELS (MEASURED BY STROKES AT 96% PUMP EFFICIENCY) - CEMENT IN PLACE AT 03:20 HRS FULLANNULAR FLUID COLUMN MAINTAINED AFTER CEMENT ENTERED ANNULUS - LOST 27 BELS DURING THE JOB, ALL AFTER CEMENT ROUNDED THE CORNER 175 BBLS OF CEMENT RETURNS TO SURFACE Printed 11/4/2019 2:24:19PM Report no.: I � Report date_ 9/9/2018 — — —— ---- Spud Datar ime: 91512019 I AFE No.: H-S4DW0019FK-EX-D1-DN- (7,293.574.00) Common Well Name: 01-37 ! OH Project: PBU Event Type: DRL- ONSHORE (DON) Contractor. PARKER DRILLING CO. BPUOI: USA00006556 I Report date: 9/15/2019 - _ 7 Report no.: 2 _ _ _ _— T spud DatelTme: 9/5/2019 -- -- —� Start Date: 9/3/2019 End Date: 9/2012019 AFE No.: Rig NamelNo.: PARKER 272 1 Rig Release: 9/22/2019 H-S4DW0019FK EX -D1 -➢N- (7,293,574.00 ) I Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) — BR�t 111 Cement job start dateltime: 9/1512019 2:0OPM Job end date/time: 911512019 4:30PM Job type: Primary Cementer: Cement Company: SCHLUMBERGER 7.000 (in) String Set TMD: 10,123.9 (ft) Hole Size: 9.875 (in) Cemented String: INTERMEDIATE CASING 1 String Size: Pyr Pipe Movement: RECIPROCATING Rotating Torque (initlavglmax): (ft -(ft -IM RPM: Rotating Time (Start -End): - Recp Drag Up/Down: (kip) SPM: Stroke Length: Reciprocating Time (Start -End): i Slurry Type: SPACER Description: MUD PUSH II Density: 11.00 (ppg) Purpose: SPACER Class: Excess: Mix Method: Yield: Mix Water Ratio: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Sacks Used: Water Volume: Slurry Volume: 40.0 (bbl) Excess Measured From: Other Volume: Total Vol in Well: PV: 12.00 (cp) YP: 96.000 (Ibf1100ft� Viscosity: 46.00 (slgt) Density: 10.50 (ppg) Mud Type: Gels 10 Sec: 5.000 (117000ft) Gels 10 Min: 9.000 (Ibf1100ft-) Slurry Type: CEMENT11.50 LITE Description: LEAD SLURRY Density: (ppg) Purpose: PRIMARY Class: Mix Method: ON -THE -FLY Yield: 1.7100 (ftslsk) Mix Water Ratio: 5.465 (gal/sk94) Excess: Density Measured by: DENSOMETER Sacks Used: 725.10 (941b sacks} Water Volume: 94.3 (bbl) Excess Slurry Volume: Excess Measured From: Total Vol in Well: Slurry Volume: 220.8 (bbl) �~ 46.00 (S/qt) Other Volume: 10.50 (ppg) PV: 12.00 (cp) YP: 16.000 (Ibf1100ft� Viscosity: Mud Type: Density: Gels 10 Sec: 5.000 (Ibf110W) Gels 10 Min: 9.000 (Ibf1100ft') Concentration Unit Type Amount Units Name 0.050 GALISX D047 ANTIFOAM AGENT 1.000 % BWOC D065 DISPERSANT 0.150 % BWOC D167 FLUID LOSS 0.025 GAUSX D177 RETARDER Printed 11/412019 2:24:48PM Common Well Name: 01-3710H Project: PBU _ _ _.— Event Type: DRL- ONSHORE (DON) Contractor: PARKER DRILLING CO. BPUOI: USA00006556 Thick time Thick (hr) temp. (°F) 546 122.00 AKA- SP come"Ung It@pt"t 729ft-k- I Report no.: 2 I Report date: 8115!2019 - -- -- —� Spud Datelfime: 91512019 - � - — - - - Start Date: 9/3/2019 _ - � End Date: 912012019 AFE No.: Rig NamelNo.: PARKER 272 1 Rig Release: 9/22/2019 1 H-S4DW0019FK-EX-DI-DN- (7,283,574.00 ) Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) �tl)� Free water Free water Fluid loss Fluid loss Fluid loss CompFStr-engtn mp Comp Strength Comp Time Comp Strength Pressure 2 Comp Strength Temperature 2 (%) temp. (cc130min) temp. press. Strength Time 1ure 1 Temperature 1 JStrength 2 (Psi) (" ) Mix Water Ratio: (,F) Sacks Used: (^F) (psi) 0...:.lqii 12.5 (bbl) (*Fl (min) Total Vol in Well: 0.00 82.0 Thick time Thick (hr) temp. (°F) 6.00 122.00 Free water Free water (%) temp. (°F) 0.00 80.00 Printed 11/4/2019 2:24ABPM Description: TAVL SLURRY Density: Excess: Mix Method: Excess Slurry Volume: Density Measured by: Slurry Volume: 26.6 (bbl) Excess Measured From: PV: 1.2.00 (cp) YP: 16.000 (Ibf/l00ft2) Viscosity: Amount Fluid loss Fluid loss I r (c630min) temp. TNS Strength ff) (psi) 31uny Type: CEMENT (min) purpose: PRIMARY Class: G -CLASS Yield: 1.1600 (f?lsk) Mix Water Ratio: 4.056 (gal1sk94) Sacks Used: 129.50 (941b sacks) Water Volume: 12.5 (bbl) Total Vol in Well: Other Volume: Density: i0.50 (ppg) Mud Type: Gels 10 Sec: 5.000 (lbf1100ft�) Geis 10 Min: 9,000 (lbf1100ft2) Name Type D047 ANTI FOAM AGENT D145A DISPERSANT GAS CONTROL AGENT D500 D167 FLUID LOSS D177 RETARDER Thick time Thick (hr) temp. (°F) 6.00 122.00 Free water Free water (%) temp. (°F) 0.00 80.00 Printed 11/4/2019 2:24ABPM Description: TAVL SLURRY Density: Excess: Mix Method: Excess Slurry Volume: Density Measured by: Slurry Volume: 26.6 (bbl) Excess Measured From: PV: 1.2.00 (cp) YP: 16.000 (Ibf/l00ft2) Viscosity: Amount Fluid loss Fluid loss Fluid loss Comp (c630min) temp. press. Strength ff) (psi) Time 1 (min) 26.0 122.00 Units Comp Comp I Comp Strength Strength Strength Time Pressure 1 I Temperature 1 2 15.80 (ppg) BATCH DENSOMETER 45.00 (B/qt) Concentration Unit 0.060 GAUSX 0.150 GAUSX 0.880 GAUSX 0.100 % BWOC 0.050 1 GAUSX Comp Strength Comp Strength Pressure 2 Temperature 2 (psi) I ('F) Common Well Name: 01 -37 1 OH Project: PBU Event Type. DRL-ONSHORE (DON) Contractor: PARKER DRILLING CO_ BPUOI: USA00006556 North t^�la - t� -�- a" C4mentt Report T Report no.: 2 1Report date; 9115/2019 — j Site:01 SpudDateTime_91512019 I End Date: 9/20/2018 j AFE No.: Start Date: 9!3!2019 Rig Narne1N0-: PARKER 272 Rig Release: 9!2212019 H-S4Dyy0018FK-EX-DI-DN- (7,283,574.00 ) F Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Ciro. Top Bottom Plug Pressure Float Pressure Temp Survey: ((t) (ft) Rate Press. Plug Plug Bumped Bumped Held Held no. (gpm) (psi} (pet) (min) 1 PRIMARY CEMENT 4,940.0 10,124.0 Y Y y Y Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pmp Pumping end dateltime Pumped Disp. Rate TMD TMD (bbl) Rate (bbllmin) (ft) (ft) Casing Test Test Pressure: 3,500.00 (psi) Time: 30 (min) Cement Found between Shoe and Collar: LoglSurvey Evaluation CSL Run: N Under Pressure: (psi) Bond Quality: N CET Run: N Bond Quality: Or) Temp Survey: N Hrs Prior to Log: (hr) Printed 11/4/2019 2:24:46PM Liner Overlap: (ft) Shoe Test F(T1LOT: (PP9) Tool: N Open Hole Length: (ft) Hours Before Start: Or) Liner Overlap: (ft) Positive Test: (Pp9) Negative Test: (Ppg) Time before test: (hr) Cmt Found on Tool: N interpretation Summary Cement Top: (ft) How Determined: TOC Sufficient: Job Rating: If Unsuccessful, Detection Indicator: Remedial Cement Required: N How Determined: Circulate Cmt Vol to I Total �nnuta Prior Surface Mud LostFlow (hO I (bbl) (bbl) After Start Disp Foam Gas Type Gas Vol BH circ. Bh static job Used temp. temp. (scq Liner Top Test Positive Test Tool: Negative Test Tool: GemnOng'RgMrt -': = : -- - — - - ` 1 Report data: 9/2112019 - - Report no.: 3 Common Well Name: 01-37 ! OHSpud DatelTme: 9/5/2019 Protect-PBU_ Site: 01- - --- - - - - - - Event Type COM- ONSHORE {CON) Start Date: 912012019 J �rEnd Dale: 912212019 AFE No. RigNamelNo.: PARKER 272 Rig Release: 9/22/2019 H-S4DW0019FK EX -DI -DN- (2,268,000.00 } Contractor. PARKER DRILLING CO. __ - - - - - - - -- - - - - - - - - _rActive datum: ACTUAL KS P272 @86.5ft (above Mean Sea Level) BPUOI: USA00006556 77- Cement job start dateltime: 9/21/2019 7:30AM Job end dateft9me: 9/21/2019 9:30AM Job type: Primary Cementer: Cement Company: SCHLUMBERGER String Set TMD: 14,273.0 (ft) Hole Size: 6.125 (in) Cemented String: PRODUCTION LINER 1 String Size: 4.500 (in) Pipe Movement: RECIPROCATING Rotating Time (Start -End): Reciprocating Time (Start -End): RPM: Recip Drag UplDown: - (k1p) 51urry Type: SPACER CEMENT 3urpose: SPACER Class: Yield: Mix Water Ratio: Sacks Used: Water Volume: Yield: Total Vol in Well: Other Volume: 2.859 (gallsk94) Mud Type: Density: 8.50 (ppg) Gels 10 Sec: 0.000 (Ibf1100tr) Geis 10 Min: 0.000 (lbf1106ft2) Slurry Type: CEMENT 15.80 (ppg) Excess: Purpose: PRIMARY Class: G -CLASS Yield: 1.16013 (ft3lsk) Mix Water Ratio: 2.859 (gallsk94) Soaks Used: 493.50 (941b sacks) Water Volume: 33.6 (bbl) Other Valume: 0.000 (Ibf1100f -) Viscosity: Total Vol in Well: Mud Type: Density: 8.50 (ppg) ..-- .., o..... n nnn rlhfll nfW) Gels 10 Min: 0.000 (Ibf1100fta) Printed 11/4/2019 2:25:45PM Rotating Torque (initlavglmax): (f -lbf) SPM: Stroke Length: Description: MUD PUSH 11 Density: Excess: Mix Method: Excess Slurry Volume: 0.0 (bbl) Density Measured by! Slung Volume: 30.0 (bbl) Excess Measured From: PV: 0.00 (cp) YP: 0.000 (lbfl100ftz) Viscosity: 12.00 (ppg) DENSOMETER 0.00 (slgt) Description: TAIL SLURRY Density: 15.80 (ppg) Excess: 30.00(%) Mix Method: BATCH Excess Slurry Volume: 23.5 (bbl) Density Measured by: DENSOMETER Slurry Volume: 102.0 (bbl) Excess Measured From: EST. GAUGE HOLE PV: 0.00 (cp) YP: 0.000 (Ibf1100f -) Viscosity: 0.00 (slgl) Common Well Name: 01-37 r OH - Event Type COM- ONSHORE (CON) Contractor: PARKER DRILLING CO. BPUOI: USA00006556 Name Type D206 ANTIFOAM AGENT D085 DISPERSANT D600 G GAS -BLOCK D157 FLUID LOSS 0177 RETARDER ANTIFOAM AGENT D047 Thick time Thick (hr) temp. (°F) 7.00 169.00 Stage Stage Typ no. 1 PRIMARY CEMENT Fluid pumped Free water Free water M temp. (`F) mer W,RepOt — -•-- ---- 9.,.;:::ti W w'=,psi ,_. Lt ".. - ---- F Report no.: 3J -- Report date: 9/21/2019 Sila: 01 - - - Spud Date/Time_9/512019 rt- - - - - - -- - - End Date: 9/22/2019 FAFE No.: smrt Date: sr2o1zo19 Rig Name/No.: PARKER 272 Rig Release: 9/22/2019 H-S4DW0019FK-EX-D1-DN- (2,268,000-00) T - Active datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) - Amount Fluid loss Fluid loss FlUd loss Comp (=130min) temp. press. Strength ("F) (psi) Time 1 (min) 0.00 80.001 34.0 169.00 Est. Top Est. Bottom Mud Girt. Mud Circ. (f{j (ft) Rats Press. (gpm) I (psi) Units Com Com Comp F p Strength . Strength Strength Time Pressure 1 Temperature i 1 2 Top Bottom plug I Pressure Float Pressure Plug Plug gumma Bumped Held Held (0) (min) Y Y Volume Avg. I Max Disp. I Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Pumped Disp. Rate TMDTMD Pmp date/time (bbl) Rate (bbVmin) (ft) (ft) Printed 11/4/2019 2:25:45PM Concentration Unit 0.100 GALISX 0.550 % BWOC 2.000 GALISX 0.100 % BWOC 0.110 GALISX 0.100 1 GAL/SX Comp Strength Pressure 2 (psi) Comp Strength Temperature 2 (°F) Retuma Circulate Cmt Vol to Total Annula Prior Surface Mud Lost Flow (hr) (bbl) (bbl) After Start DispI Foam Gas Type GasVol Stemp • B static ed tamp. am Common Well Name: 01-371 OH Project: PBU _ _ _ Event Type: COM- ONSHORE (CON) Contractor: PARKER DRILLING CO. BPUOI: USA00006556 Casing Teat Test Pressure: 3,500.00 (psi) Time: 5 (min) Cement Found between Shoe and Collar. CBL Run: Under Pressure: Bond Quality: CET Run: Bond Quality: Temp Survey: Hrs Prior to Log: Log/Survey Evaluation N (Psi) Printed 1114!2019 2:25:45PM jl # lll� Rr l't . Report no.: 3 1Reportdate_9/2112019 Site: 01 Spud DatelTime 91512019 1 — —---=- - AFE No.: Start Data: 8120/2019 End Date: 8122!2019 Rig NamelNo.: PARKER 272 Rig Release: 9122/2019 H-S4DW0019FK-EX-DI DN- (2,268,900.00 ) tActive datum: ACTUAL KB P272 @86.5ft (above Mean Sea Level) Shoe Test FITILOT: (Ppg) N Open Hole Length: (ft) Hours Before Start: (hr) Liner Overlap: (ft) Positive Test: (Ppg) NegativeTest (Ppg) Time before test: (hr) Cmt Found on Tool. N Interpretation summary Cement Top: (ft) How Determined: TOC Sufficient N Job Rating: If Unsuccessful, Detection Indicator. Remedial Cement Required: N How Determined: Liner Top Teat Positive Test Tool: Negative Test Tool: N N DRILL SITE 1 MON. 1-B 0 01-03 ■ 01-04 01-37 . 01-36 GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 Tmah - 100 ft. jEGEND AS -BUILT CONDUCTOR ■ EXISTING WELL GEODETIC POSITION(D.DD) CONTROL MONUMENT NQ 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4. NAD27. (EPSf:25734) 2. GEODETIC POSITIONS ARE NAD27. (EP%4267) 3. BEARINGS AND DISTANCES SHOWN ARE ALASKA STATE PLANE GRID. 4. DRILL SITE 1 AVERAGE SCALE FACTOR IS 0.9999443. 5. BASS OF VERTICAL CONTROL IS DRILL SITE 1. 2018 WELL BORE SUBSIDENCE STUDY FOR WELL 1-04 BASE FLANGE ELEVATION, EL 43.51'. 6. DATE OF SURVEY, JULY 27, 2019. 7. REFERENCE FIELD BOOK: WS -19 PGs. 15-18. 8. ESIIMATEO RELATIVE ACCURACY (THIRD ORDER): BASELINE DISTANCE: 1:353.624 BASELINE AZIMUTH: N/A ALLOWABLE VERTICAL CLOSURE: MOV. FOUND: MD0' 9. NAD27 COORDINATES DERIVED USING TRIMBLE BUSINESS CENTER-HCE, VER. 3.42. 10.GEODETIC COORDINATES DERIVED USING AUTODESC AUTOCAD CIVIL 3D 2016, VER. 120.8420. VICINa MINE SCALE: 1"= 800' 1 I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL COT OFD OTHEERjuLY27ETAILS ARE HELD COORDINATES OF RECORD DRILL STE 1 MONUMENT 1-8 Y 8.940,954.74 N. (-)1000.00 NAO278 67,44&73 SP, ZONE t 051 PLANTaOD DESCRIPTION: 8'4" STEEL PLATE WELDED ONTO 3' DIA. STEEL. PIPE, 2.0FTt ABOVE TUNDRA GRADE. NE CORNER DRILL SITE 1 GRAVEL PAD. MONUMENT IS IN FAIR CONDITION. LOCATED WITHIN PROTRACTED SECTION 8. T. 10 N., R. 15 WELL A.S.P. PLANT COORDINATES GEODETIC POSITION(DMS) GEODETIC POSITION(D.DD) NO. COORDINATES Y= 5,940,437.21 N= —1,777.72 70'1428.819° 70.2413386' 01-37 X= 698,736.06 E- 1,149.10 148'23'41.594" 148.3948871' neer: "'",. _, ARNHAR om 8 9 �` 9051 { cM AECCSE �VM � Mem � 1' - 100' :., UMIAT MERIDIAN, ALASKA SECTION PAD CELLAR BASE OFFSETS ELEVATION BOX EL FLANGE 4,793' FSL 39.5' 39.5' N/A 3,868' FEL ZE PRUDHOE BAY, ALASKA EOA DRILL SITE 1, WELL 01-37 1 G I CONDUCTOR AS—BUILT I THE STATE 01ALASKA GOVERNOR MIKE DUNLEAVY Kenneth W. Allen Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 01-37 BP Exploration (Alaska), Inc. permit to Drill Number: 219-073 Surface Location: 488' FNL, 1409' FWL, SEC. 08, Tl ON, RI 5E, UM Bottomhole Location: 260' FNL, 3597' FWL, SEC. 09, TION, R15E, UM Dear Mr. Allen: Enclosed is the approved application for the permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, ov Daniel T. Seamount, Jr. Commissioner 5 DATED thisZ I day of May, 2019. 4a. Location of Well (Governmental Section): Surface: 488' FNL,1409' FWL, Sec. 08, T10N, R15E, UM Top of Productive Horizon: 2451' FNL, 385' FWL, Sea 09, T1 ON, R15E, UM Total Depth: 260' FNL, 3597' FWL, See. 09, T10N, R15E, UM qb Location of Well (State Base Plane Coordinates - NAD 27): Surface: x- 698734 . y- 5940436 ' Zone - ASP 4 16. Deviated wells: Kickoff Depth: 600. feet Maximum Hole Angle: 97 degrees 18. Casing Program: 7. Property Designation (Lease Number): ADL 028329 & 028328 B. DNR Approval Number: 13. Approximate spud dale: 79-179 August 26, 2019 9. Acres in Property: 2501 & 2560 14. Distance to Nearest Property: 28000 10. KB Elevation above MSL: 87.15 • feet 15. Distance to Nearest Well Open to Same Pool: GL Elevation above MSL: 40.15 Jeet 211 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3332 ' Surface: 2442 Tao - Settina Depth - Bottom I Cement Quantity, c.f. or sacks Hole STATE OF ALASKA i ASKA OIL AND GAS CONSERVATION COMMISSh MAY 13 2019 Grade PERMIT TO DRILL I MD TVD MD I TVD jincium"m ata a team, 20 AAC 25.005 215.5# A-53 1a. Type of Work: ib. Proposed Well Class: Exploratory - Gas ❑ Service -WAG ElService - Disp❑ e 1c. Specify) I i po ditor: ®. Lateral ❑ Stratigraphic Test 11 Development -Oil m .Service Winj ❑ Single Zone 0. Coalbed Gas ❑ Gas Hydrates 13Drill Redrill ❑ Reentry ❑ Exploratory - Oil 13 Development - Gas ❑ Service - Supply 13Multiple Zone 11 Geothermal 11 Shale Gas EI VamTop HC 10077' 5. Band Blanket ® *Single Well ❑ 11. Well Name and Number. 2. Operator Name: BP Exploration (Alaska), Inc Bond No. 295105380 PBV 01-37 , Address: B. Proposed Depth: q_Q90-478 sx Class 'G' 12. FieldlPool(s): 3. MD: 14255' • TVD: 8987' • PRUDHOE BAY, PRUDHOE P.O. Box 196612 Anchara a AK 99519612 1 I OIL , 4a. Location of Well (Governmental Section): Surface: 488' FNL,1409' FWL, Sec. 08, T10N, R15E, UM Top of Productive Horizon: 2451' FNL, 385' FWL, Sea 09, T1 ON, R15E, UM Total Depth: 260' FNL, 3597' FWL, See. 09, T10N, R15E, UM qb Location of Well (State Base Plane Coordinates - NAD 27): Surface: x- 698734 . y- 5940436 ' Zone - ASP 4 16. Deviated wells: Kickoff Depth: 600. feet Maximum Hole Angle: 97 degrees 18. Casing Program: 7. Property Designation (Lease Number): ADL 028329 & 028328 B. DNR Approval Number: 13. Approximate spud dale: 79-179 August 26, 2019 9. Acres in Property: 2501 & 2560 14. Distance to Nearest Property: 28000 10. KB Elevation above MSL: 87.15 • feet 15. Distance to Nearest Well Open to Same Pool: GL Elevation above MSL: 40.15 Jeet 211 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3332 ' Surface: 2442 Tao - Settina Depth - Bottom I Cement Quantity, c.f. or sacks Hole Casio Weiaht Grade Counlino Len th I MD TVD MD I TVD jincium"m ata a team, 20"x34" 215.5# A-53 80' Surface Surface 167' 167' 260 sx Arctic Set (Anorox.) 42" Vam21 3850' Surface Surface 3850' • 3487' 2118 sx LiteCrete, 255 sx as 13-112" 10-314" 45.5# VamTop HC 10077' Surface Surface 10077' ' 8622' 490 sx Class'G' 9-718„ 7" 26# -80 8640' q_Q90-478 sx Class 'G' 6-118" 4-117 12.6# 13Cr85 VamTop 3 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) 19 Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Total Depth MD {ft): Surface Intermediate Production Liner Perforation Depth MD (ft): Hydraulic Fracture planned? size Yes ❑ No H Cement Volume Perforation Depth TVD 20. Attachments Property Plat ❑ BOP Sketch ® Drilling Program 0 Seabed Report ❑ 21. Verbal Approval: Commission Representative: hereby Certify a e foregoing is true and tne proCeGUre appnNeG herein wr I not Be devra from without prior written approval. Authorized Name Allen Kenneth W Authorized Title Engineering Team Lead S Authorized Signature �� P___Dat MD I TVD Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Drilling Fluid Program ® 20 AAC 25.050 requirements 0 Date Contact Name Nocas, Noel Contact Email Noel.Nocas@bp.com Contact Phone +1 9075645027 . �j Permit Approval See cover letter for other Permit to Drill /� API . 50- 00 r4 � `Kf Date: 5 requirements: Number /LLL IT Conditions of approval; If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, gas contained in shales: Other: 35-, 3q e& 1r Samples req'd: Yes �❑// No Mud log req'd: Yes ❑ No U H2S measures Yes tis No ❑ / Directional svy req'd: Yes No ❑ �{ t11L 6 ar! ry-r '%*%A& C"'e ��"��Spaexception req'd: Yes 11No Inclination -only svy req'd: Yes ❑ No -' 1 Tt3 � 1 c ©. 'A60-% I,", Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY1 Approved by: COMMISSIONER THE COMMISSION Date: L/! 7 6r�It'q ORIGINAL ((//���s_,jeJ�diSp!►2017 unit ie valid for 24 months from the date of approlral (20 AAC 25.005(g)) mORU •i+1i/� bmk Form and Form 10401 Revs This pe ' �(ttachments in Duplicate by oss To: Alaska Oil & Gas Conservation Commission From: Noel Nocas Date: May 13, 2019 RE: 01-37 Permit to Drill The 01-37 well is scheduled to be drilled by Parker 272 in August 2019. This grassroots well will target a horizontal oil pad on the eastern margin of DS -01 and the western flank of DS -03. The S- shaped production hole is planned in Ivishak Zones 2, 3 and 4 to provide 3 possible offtakes during the life of the well. The planned well is a modified slimhole design, with 10-3/4" surface casing set in SV4, 7" intermediate casing top setting Sag River, and 4-112° production liner. The maximum anticipated surface pressure from the Ivishak with a full column of gas from TD to surface is 2442 psi (assumes 7.2 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. (5,000 psi on initial test) A detailed operations summary is included with the permit application. If there are any questions concerning information on 01-37, please do not hesitate to use the contact information below. Noel Nocas Office: (907) 564-5027 Cell: (907) 229-9532 Email: noel.nocasAbp.com Attachments: Well Bore Schematic Directional Package BOPE Schematic Diverter Line Layout Diagram 01-37 PTD 1 5/13/2019 Planned Well Summary Well 01-37 vele ectiv Producer Oh eget, Ivishak Current Status Grass Roots Well Estimated Start Date: 1 8/26/2019 Time to Complete: 27.6 Days Appx Northing Easting Offsets TRS Surface 5,940,436.2 698,733.74 487.9' FNL - 10N 15E Sec 8 - Location 1 O 15E Sec 9 - 1409.4 FWL 706,191.37 Planned KOP: 600'MD Planned TD: 14,255 MD 18,900' TVDss Rig: Parker 2 1 GL -RT: 47 RTE ref MSL : 1 87.15 ` nirpe Pinnal — Bakpr wnn9 Northing Easting TVDss Offsets TRS Tgt 3 TSAD 5,938,586.58 703,026.01 8,535 2450.95' FNL 365.19' FWL 1 O 15E Sec 9 Tgt 6 BHL 5,940,865.04 706,191.37 8900 5020.22' FSL 3596.75 FWL 10N 15E Sec 9 Planned KOP: 600'MD Planned TD: 14,255 MD 18,900' TVDss Rig: Parker 2 1 GL -RT: 47 RTE ref MSL : 1 87.15 ` nirpe Pinnal — Bakpr wnn9 01-37 PTD 2 5/13/2019 --350 in the surface section Maximum Hole Angle: -350 in the intermediate section -97° in the production section All offset wells pass BP anti -collision scan criteria, but some offsets must Close Approach Wells: be shut-in to pass scan criteria - reference "Surface and Anti -Collision Issues" section. Surface to 1400' MD =GYRO ' Survey Program: 1400' MD to TD = MWD+IFR+MS ✓ Nearest Property Line: -28,000' - Nearest Well within Pool: -211'(01-09A)- 01-37 PTD 2 5/13/2019 Formation Tops and Pore Pressure Estimate (SOR) Formation top /Fluid contact Estimated top depth (TVDss) Most Likely Pore pressure (EMW ppb) Fluid type (for sands) GI 400' 8.43 Water BPRF 1930' 8.43 Water SV6 2300' 8.43 Water SV5 2770' 8.43 Water SV4 2850' 8.43 Water SV3 3450' 8.43 Water SV2 3650' 8.43 Water SV1 4050' 9.08 Water UG4 4640' 9.08 Water UG4A 4662' 9.08 Water UG3 4850' 9.08 Water UG1 5650' 9.08 Water W52 6106' 9.08 Water WS1 6360' 9.08 Water CM3 6620' 8.83 Gas* CM2 7075' 9.8 Gas* CMI 8100' 9.8 Gas* THRZ 8275' 10.1 Gas* BHRZ 8400' 10.1 Gas* LCU 8430' 9.95 Gas* TJA 8470' 9.95 Gas* TSGR 8535' 5.73 Gas/Oil TSHU 8565' 7.27 Gas/Oil TSAD 8630' 7.23 Gas 42N 8760' 7.16 Gas/Oil TCGL 8815' 7.15 Gas/Oil/Water BCGL 8870' 7.17 Oil/Water *Shale formation - Gas Cut Mud from isolated sand string iers 01-37 PTD 3 5/13/2019 Casing/Tubing Program Liner l 1fI/ R Grade Conn Hole Size Length Top MD Bottom MD 1 T Dss Tbg O.D. 42" 2(Y'x 34" 215.5# A-53 - 80' Surface 167.2'/ 80' 13-112" 10-314" 45.5# L-80 Vam 21 3,850 Surface 3,850'/ 3,400' 9-718" 7" 26# L-80 VAM TOP HC 10,077' Surface 10,077' 18,535' 6-118" 4-112" 12.6# 13Cr-85 VAM TOP 4,330' 9,927' 150' la 14,255' / 8,900' 9,92718,415' Tubing 4-112" 12.6# 13Cr-85 VAM TOP 9,927' Surface {- V into liner PBR} Mud Program Surface Mud Pro ernes: MMS 13-112" Hole Section i Qyppall Fl. �._.. �,. ..1] • . Pw Surface - 3,850' Mn 8.7-9.2 -1 6-20 35-80 <15 25-60 10 -11 Intermediate Mud Properties: LSND 9-718" Hole Section Boom � R. ww #L . UOT PH 3,850' MD - TSV1 9.2 -11.0 ' 8-18 18-25 <5 NA <20 8.5-9.5 TSV1 -TCM3 9.8-11.0 • 8 18 18-25 <5 NA NA <2D 8.5-9.5 <20 8.5-9.5 TCM3 -THRZ 10.1-11.0 • 8-18 18-25 <5 <5 <10 <20 8.5 - 9.5 THRZ -10 077' 10.3 -11.0 • B-18 18-25 Production Mud Properties, Water Based Pol mer Fluid 6-118' Hole Section 1�� APC F!'!'ftP!� aJi''i PH 8.5 - 9.5 10,077' MD - TD 8.5-9.8 - <8 12-20 <12 NA <4 I nnninn Pmnram 01-37 PTD 4 5/13/2019 Cement Program ;�VqF Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub -Surface Pressure Management: .f The closest injection wells are 01-09A and 03-16A — Both of these wells are long term shut ins and there are no plans to bring them on Injection. They will remain Shut in for the duration of the well. Anti -Collision: None. All offset wells pass BP Anti -collision Scan Criteria. However 01-09A should remain shut in for the duration of the well Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP 01-37 PTD 5/13/2019 Hydrogen Sulfide Reference "Drilling Critical Issues" section. Faults Reference "Drilling Critical Issues" section. Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations wiii be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (869-5893) for guidance. 01-37 PTD 6 5/13/2019 Well Control The 13-112° surface hole will be drilled with a diverter (see attached diverter layout). The 9-718" hole and 6-118" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for 01-37 will be 14 -days with function test every 7 -days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 -day BOP test period should not be requested. 9-718" Intermediate Interval Maximum anticipated BHP 2,543 psi at the TSGR at 8,532' TVDss 5.73 ppg EM Maximum surface pressure 1,690 psi at the TSGR 0.10 psilft gas gradient to surface 25 bbls with 12.1 ppg frac gradient. Kick tolerance Assumes 5.73 ppg pore pressure in the SGR + 0.5ppg kick intensity and 10.5 pp9 MW. Rams test to 3500 psi 1250 psi. Planned BOP test pressure Annular test to 3,500 psi 1250 psi Integrity Test —12-114" hole LOT after drilli n -g 20'-50' of new hole 9-518" Casing Test 3500 si surface ressure dm -4j o Drnr9nu_*inn Intarval 01-37 PTD 7 5/13/2019 Variance Requests 1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000 ft). This is a variance from 20 AAC 25.033. Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 10 bbis has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.6 — 9.2 ppg fluid will provide over balance to formation fluid. 5/1312019 01-37 PTD Drill and Complete Operations Summary Pre -Rig Operations 1. Install and survey 20" conductor and cellar box. 2. Weld on landing ring. 3. Level pad and prepare location. Rig Operations 1. MIRU Parker 272. 2. Nipple up diverter system and function test. Notify AOGCC 24 hours in advance of test. 3. MU 13-112" surface drilling assembly and drill to TD. POOH and LD drilling assembly. 4. Run 10-314" casing to TD and cement. Test casing to 3500 psi. 5. Nipple down diverter system. Nipple up 11" wellhead system. Nipple up BOPS and test to 5000 psi. a. (Configured from top to bottom: 13-518" annular preventer, 4-112" x 7" VERs in the upper, cavity, blind/shear rams, mud cross and 2-718" x 5" VBR's in the lower cavity). ➢ Test annular to 250 psi 13,500 psi 6. MU 9-718" intermediate RSS drilling assembly (DIRIGRIRES) and drill shoe track and 20'-50' formation.a ��^�. 7. Perform LOT. h.a-�� +Lo -r Vohrd To J400Z-L1C#01�u�G T� T 8. Drill to 9-718" section to TD. POOH and LD drilling assembly. 9. Run 7" casing to TD and cement. Test casing to 3500 psi. 10. Install 7" casing packoff and test to 3500 psi. Inject freeze protect into 7" x 10-314" annulus. 11. Swap 4-112" x 7" variable bore rams to 2-718" x 5" variable bore rams and test same to 3,500 psi � Ly�J �y.a5: -s.- *sg.•r' 12. MU 6-118" production drilling assembly and drill shoe track and 20'-50' formation 13. 13. Perform FIT. c'rr �- C,�S)A� (.Te'S'T �/T %SI�i�/Q Td 14. Drill 6-118" section to TD in the Ivishak Formation. POOH and LD drilling assembly. 15. Run 4-112" liner to TD and cement. Set hanger and liner top packer. POOH and LD liner running assembly. 16. Test liner 1 liner top packer to 3500 psi. 17. Run and land 4-112" completion. 18. Freeze Protect wellbore 19. Set TWC and test to 3500 psi. 20. Nipple down BOPS. Nipple up adapter and dry hole tree and test to 4500 psi. 21. RDMO Parker 272. Post -Rig Operations 1. Pull TWC and perform tree work as needed 2. Pump Corrosion inhibitor and set production packer 3. Run RPM log and Perforate Wellbore 4. Pull B&RIRHC. Set GL design 01-37 PTD 9 5/13/2019 01-37 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control I Reservoir Pressures A. Surface Hole: The SVs are expected to be at 8.43 ppg EMW. Formation pressures will be controlled with 8.7 — 9.2 ppg mud to section TD. The surface casing is planned to be set above possible free gas zones. . B. Intermediate Hole: The Ugnu is expected to be at 9.08 ppg EMW. This section will TD in the Sag River. Formation pressures will be controlled with 9.2 — 10.5 ppg mud (up to 11.0 ppg for shale stability if needed). C. Production Hole: The Sag River is expected to be 5.73 ppg EMW. The top of the Ivishak will be penetrated and is expected to be 7.23 ppg. Reservoir pressures will be controlled by using 8.5 — 9.8 ppg mud. II. Lost Circulation/Breathing A. Intermediate Hole 1: There are no expected fault crossings in the first intermediate hole. However, breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of high ECD's. B. Production Hole: There are 3 expected fault crossings in the production hole. Past wells have experienced severe lost circulation and well bore breathing in the Ivishak 111. Fault Locations Fault name Throw and MD TVDss direction and Lateran position Lost circulation formation intersect intersect ma nitude uncertain potential Fault # 1 11375' 8910' 0-10' DTE Low: <200 ft Low: <25% Fault # 2 11990' 8835' 10-15' DTE Low: <200 ft Low: <25% Fault # 3 13,500' MD 8670' 15-20' DTS Low: x200 ft Med: <75% & ,25% TVDss IV. Integrity Testing Test Point Fest Depth. Testtvpe IE^MWIb i 10-314" Shoe 20'-50' from the shoe LOT 12.1 7" shoe 20'-50' from the shoe FIT 9.7nno r 01-37 PTD 10 5/13/2019 V. Hydrogen Sulfide ,/ DS01 isconsidered an H2S site. Recent H2S data from the pad is as follows: W011 mama H2S Lapel Readina Date Comments Parent well (if sidetrack) #1 Closest SHL well H2S level #2 Closest SHL well H2S level #1 Closest BHL well H2S level #2 Closest BHL well H2S level #3 Closest BHL well H2S level #4 Closest BHL well H2S level Max. recorded H23 on padlfacility Other relevant H2S data (H2S alarms from rigs, etc. NIA 01-03 24 4130118 01-05 10 218113 Adjacent well 03-25A 30 111119 To the SE 1,500' 03-24B 10 2122118 To the SE -1,500' 03-22A 25 112119 To the 5E -1,500' 01-12A 14 11/24/18 To the NW -1,500' 01-07A 194 04/09/1990 NIA VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria. 01-09A should remain shut in for drilling operations. CONSULT THE DS01 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 01-37 PTD 11 5/13/2019 7 Tim= VARI -EAD = ACTUATOR = t&KB. ELEV _ BF. ELEV = Max Angle = -- Datum MO= ` Datum TVD= 8800'SS Muruo=D REV 3 20' COPD, -f 129.46 #, X-58. ® = 18.770' 10-/4' CSG, 45.511, L-80 BTC, ID = 9.950• ESTCuIATI� TOP OF CEMEW Minimum ID = 3.726" 4-112" HES XN NIPPLE TOP OF 4-112' LNR 9927• 4-112' TBG, 12.6#. 13CR45 VAIN TOP, _0152 bpf, D = 3.958' 7' CSG, 28#, L40 VAIN TOP HC, 0 -6-276- PERFORATION SLMMRY RBF La. _ _ .ON ^! J ANGLE AT TOP PERF: —' Note: Refer to Production DB for historical perf data 4-1/2' LNR. 12.611, 13CR-85 VARA TOP. 14255' .0152 W, ID = 3.958' ` SAFEn . TES o:WELL AN[X E > 7Q" -37 MAX Ol r: B CHROME TBG& LNR [4`1x2" FCS x Ni', D = 3.813" 1 - I r \ae Lrm= Q 5T MD I TVD Del/ TYPE VLV LATCH PORT DATE G 4028 3700 5 6181 5400 4 7575 6500 3 8208 7000 2 8838 7500 1 9898 8375 4-11rHIM XNP. D=3.813" 7" X4 -V2" AmTwRm ID=3.875" 4-112' HM X NP ID= 3.818" 4-1f2' H3S XN NP, D = 3.725" 7--Fr—x5" W1FD UP WTEBACK SLEEVE 8 WFD HGP, D = 4.42W -- d4-112" WLER ID=3.958" 5' 74-10- XO, D = 3.930' PRLDHOE BAY LW VALL• `d1-37 PFfBNT No: �.. AS No: 50 -029 - SBC 08, Ti OR R15E 4648' FSL 8 3840' Fla BP Exploration (Alaska) North America - ALASKA - BP PBU 01 01-37 PLAN 01-37 Plan: 01-37 WP09 Well Plan Survey Report 23 April, 2019 RE- Company Project syr, Well: Wellbore' Design: NorthAmerica- ALASKA - BP PBU 01 01-37 PIAN 01-37 01-37 WP09 Pro1ecit PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones ` Geo Datum: NAD27 ' OGP-Usa AK [4287'15864] Map Zone: NAD27 ` OGP-Use AK! Alaska zone 4 [26734'1586, Latitude: 70° 14'43.905 N site 01, TR -10-15 Site Position: 0.000 in From: Map Position Uncertainty: 0.00 usft Well 01-37 Well Position +W -S 0.00 usft 148° 23'41.662 W +El -W 0.00 usft Position Uncertainty 0.00 usft Wellbore PLAN 01-37 Magnetics Model Name Sample Date BGGM2018 11!112019 Design 01-37 WP09 Audit Notes: Version: Vertical Section: BP Well Plan Survey Report Northing: Easting: Slot Radius: Northing: Easting: Wellhead Elevation: Declination n 16.68 Local Co-ordinate Reference: Well 01-37 TVD Reference ' Plan KB P272 @ 87.15usft (Plan KB P272) MD Reference Plan KB P272 @ 87.15usft (Plan KB P272) North Raference, True Survey catculawn Method: Minimum Curvature Database EDM R5K - Alaska PROD - ANCP1 system Datum: Mean Sea Level Tie On depth: 42.05 Depth From (TVD) Using Well Reference Point +EI -W Direction (uaffJ Using geodetic scale factor Wait) 11 5,941,932.140 usft Latitude: 70° 14'43.905 N 697,237.600 usft L.ongltude: 148° 24' 24.004 W 0.000 in Grid Convergence: 1.50, 5,940,436.200 usft Latitude: 70° 14'28.810 N 698,733.740 usft Longitude: 148° 23'41.662 W 45.10 usft Ground Level: 40.00usft Dip Angle (9 Field Strength (nT) 80.89 57,400 Phase: PLAN Tie On depth: 42.05 Depth From (TVD) +N -S +EI -W Direction (uaffJ (usft) Wait) 11 42.05 0.00 0.00 75.00 COMPASS 5000.1 Build 81D 4123/2019 3:04:31AM Page 2 BP Well Plan Survey Report Company. North America - ALASKA- BP Local Co-ordinata Reference• Well 01-37 TVD Reference; Plan KB P272 @ 87.15usft (Plan KB P272) Project: PBU MD Reference Plan KB P272 0 67.15usft (Plan KB P272) SRO: D1 Well: 01-37 North Reference. True Survey Calculation Method: Minimum Curvature Wellbore PLAN 01-37 Database. EDM R5K - Alaska PROD - ANCP1 Design-. 01-37 WP09 Survey Tool Program Deis 412=019 From To lusft} (usft) Survey (Wellbore) Tool Name Description 42.05 400.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 42.05 400.00 01-37 WP09 (PLAN 01-37) GYD-GC-SS Gyrodate gyro single shots it 400.00 700.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 400.00 700.00 01-37 WP09 (PLAN 01-37) GYD-GC-SS Gyrodata gyro single shots 700.00 1,000.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling I I, 700.00 1,000.00 01-37 WP09 (PLAN 01-37) GYD-GC-SS Gyrodeta gyro single shots 1,000.00 1,400.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 1,000.00 1,400.00 01-37 WP09 (PLAN 01-37) GYD-GGSS Gyrodata gyro single shots 1,400.00 3,855.00 01-37 WP09 (PLAN 01-37) MWD MWD - Standard 1,400.00 3,855.00 01-37 WP09 (PLAN 01-37) MWD+IFR+MS-WOCA MWD + LFR + Muhl Station W!O Crustal 3,855.00 10,078.00 01-37 WP09 (PLAN 01-37) MWD MWD - Standard 3,855.00 10,078.00 01-37 WP09 (PLAN 01-37) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,078.00 14,254.77 01-37 WP09 (PLAN 01-37) MWO MWD - Standard 10,078.00 14,254.77 01-37 WP09 (PLAN 01-37) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W!O Crustal Planned Survey Inc Au TVD TVDSS NIS E1W Nordling Fasting DLeg TFace MD ("} (uaft) lush) (usftl (usft) {Haft) iusft) C1100usft) (') E (usft) 42.05 (1) 0.00 0.00 42.05 -45.10 0.00 0.00 5,940,438.200 698,733.740 0.00 0-00 !, 0.00 0.00 100.00 12.65 0.00 0.00 5,940,436.200 698,733.740 0.00 0.00 100.00 200.00 0.00 0.00 200.00 112.85 0.00 0.00 5,940,436.200 698,733.740 D.00 0.00 300.00 0.00 0.00 300.00 212.85 0.00 0.00 5,940,436.200 698,733.740 0.00 0.00 400.00 312.85 0.00 0.00 5,940,436.200 698,733.740 0.00 0.00 400.00 0.00 0.00 487.15 0.00 0.00 487.15 400.00 0.00 0.00 5,940,438.200 698,733.740 0.00 0.00 'i G1 500.00 0.00 0.00 500.00 412.85 0.00 0.00 5,940,438.200 886,733.740 0.00 0.00 Start Build 1.00 599.99 512.84 0.00 0.67 5,940,436.223 698,734.812 1,00 90.0 600.00 1.00 90.00 699.98 612.81 0.00 3.49 5,940,436.292 698,737.229 1.00 0.00 700.00 2.00 90.00 712.71 0.00 7.85 5,940,436.407 698,741.589 1.00 0.00 800.00 3.00 90.00 799.86 900.00 4.00 90.00 899.68 812.53 0.00 13.96 5,940,436.588 698,747.691 1.00 0.00 COMPAS.3Vj� K i Bu,.W 8 f 412312019 3,04,31AM Page 3 SIP 0 by Well Plan Survey Report Local Co-ordinate Reference: Well 01-37 Company. North America - ALASKA - BP TVD Reference; Plan KS P272 @ 87.15us1t (Plan KB P272) Project PBU MD Reference• Plan KB P272 @ 87 15usft (Plan KB P272) SRO; 01 North Reference• True Well: 01-37 Survey Calculation Method: Minimum Curvature Wellbore: PLAN 01-37 ellbo; PLAN 01-37 Database EDM R5K - Alaska PROD - ANCP7 Design Planned Survey inc Aa TVD TVDSS Nts FEW Northing Easting DLeg TFace MD f) 1°) (usft) Waft) lusft) tusft) lush! (usft) (-1100usm (1) (usft) 5.00 90.00 999.37 912.22 0.00 21.80 5,940,43e.775 698,755.534 1.00 0.00 1,000.00 Start Build 2.00 7.00 90.00 1,098.81 1,011.66 0.00 32.26 5,940,437.050 698,765.982 2.00 0.0 1,100.00 90.00 1,187.83 1,110.68 0.00 46.17 5,940,437.417 698,779.893 2.00 0.00 1,200.00 9.00 90.00 1,296.31 1,209.16 0.00 63.54 5,940,437.875 698,787.250 2.00 0.00 1,300.00 11.00 Start Build 3.00 90.00 1,393.83 1,308.78 0.00 85.18 5,940,438.445 898,818.883 3.00 0.00 1,400.00 14.00 90.00 1,490.28 1,403.13 0.00 111.90 5,940,439.150 698,845.593 3.00 0.00 1,500.00 17.00 90.00 1,585.10 1,497.95 0.00 143.62 5,940,439.988 688,877.307 3.00 0.D0 1,600.00 20.00 Start DLS 3.00 TFO 60-74 97.12 1,678.58 1,591.44 -2.28 179.01 5,940,438.637 898,812.741 3.00 80.7 1,700.00 21.62 1,770.95 1,683.80 -9.13 218.71 5,940,432.789 698,950.602 3.00 54.08 1,800.00 23.50 103.22 1,900.00 25.58 108.43 1,861.92 1,774.77 -20.51 256.61 5,940,422.459 688,990.786 3.00 48.45 2,000.00 27.82 112.87 1,951.26 1,864.11 -36.41 298.60 5,940,407.676 699,033.182 3.00 43.71 2,075.12 29.59 115.79 2,017.15 1,930.00 -51.29 331.46 5,940,393.665 699,066.416 3.00 39.74 I BPRF 30.16 118.68 2,038.72 1,951.57 -58.77 342.58 5,840,388.479 699,077.675 3.00 37.16 2,100.00 2,124.06 2,038.91 -81.55 386.41 5,940,364.822 698,124.142 3.00 36.40 2,200.00 32.64 119.99 34.61 122.26 2,188.88 2,101.73 -103.85 425.30 5,940,343.806 699,161.802 3.00 33.58 2,277.85 Start 6298,19 hold at 2277.85 MD 122.26 2,207.12 2,118.97 -110.56 435.94 5,840,337.173 699,172.414 0.00 0.00 2,300.00 34.61 34.61 122.26 2,289.42 2,202.27 -140.88 483.97 5,940,308.133 699,221.225 0.00 0.00 2,400.00 34.61 122.26 2,371.72 2,284.57 -171.20 532.00 5,940,279.094 699,270.036 0.00 0.00 2,500.00 34.61 122.26 2,387.15 2,300.00 -176.88 541.00 5,840,273.650 699,279.186 0.00 0.001 2,518.74 SVG 34.61 122.26 2,454.03 2,366.88 -201.52 580.03 5,940,250.054 699,318.847 0.00 0.00 2,600.00 34.61 122.26 2,536.33 2,449.18 -231.84 628.06 5,940,221.014 699,367.658 0.00 0.00 2,700.00 122.26 2,618.63 2,531.48 -262.15 676.09 5,940,191.975 699,416.489 0.00 0.00 2,800.00 34.61 COMPASS 5000.1 Build 81D 4/23/2019 3:04:31AM Page 4 BP 0 }gyp Well Plan Survey Report Local Co-ordinaW Reference: Well 01-37 Company North America company -ALASKA- BP WD Reference. Plan KB P272 @ 87.15usit (Plan KB P272) ProjeLt MD Reference Plan KB P272 @ 87.15usft (Plan KB P272) Site: 01 North Reference True Wall: 01-37 Wk Survey Calculation Method: Minimum Curvature alPLAN 01-37 Database. EDM R5K- Alaska PROD - ANCPi Design 01-37 WP09 Planned Survey MD Inc Aa TVD NDSS NIS EW Northing Eesdng (U51" DL"TFacs (°1104usltj 1°) (USM(0)1°) (usft) (usft) (waft) (usa) 724.12 (uatt) 5,940,162.935 699,465.280 0.00 0.00 2,900-00 34.61 122.26 2,700.94 2,613.79 -292.47 772.15 5,940,133.896 699,514.091 0.00 0.00 3,000.00 34.61 122.26 2,783.24 2,696.09 -322.79 122.26 2,837.15 2,750.00 -342.65 803.61 5,940,114.874 699,546-063 0.00 0.00 3,065.50 34.61 EOCU 122.26 2,857.15 2,770.00 -350.02 815.29 5,940,107.817 689,557.925 0.00 0.00 3,089.80 34.61 SV6 122.26 2,865.54 2,778.39 -353.11 820.18 5,940,104.856 699,562.802 0.00 0. 00 3,100.00 34-81 2,850.00 -379.49 861.97 5,940,079.590 899,805.369 0.00 0-00 3,187.00 34.61 122.26 2,937.15 SV4 122.26 2,947.85 2,860.70 -383.43 868.21 5,840,075.816 fi99,611.713 0.00 0• 00 3,200.00 34.61 122.26 3,030.15 2,943.00 -413.74 918.25 5,940,046.777 699,660.524 0.00 0.00 3,300.00 34.61 3,025.30 -444.06 984.28 5,940,017.737 899,709-335 000 0.00 3,400.00 34.61 122.26 3,112.45 1,012.31 5,939,988.697 699,758.145 0.00 0.00 3,500.00 34.61 122.26 3,194.76 3,107.61 -474.38 1,060.34 5,939,959.658 899,806.958 0.00 0.001 3,600.00 34.61 122.26 3,277,06 3,189.91 -504.70 1,1D8.37 5,939,930-818 699,855.767 0.00 0.00 3,700.00 34.61 122.28 3,359.36 3,272.21 -535.02 34.61 122.26 3,441.67 3,354.52 -565.33 1,156.40 5,939,901.578 699,904.578 0.00 0.00 3,800.00 3,487.15 3,400,00 -582.09 1,182.94 5,939,885.530 698,931.553 0.00 0.00 3,855.26 34.81 122.26 10 3!4"0.00 3,523.97 3,436.82 -595.85 1,204.43 5,939,872.539 689,953.389 0.00 3,900.00 34.61 122.26 3,450.00 -600.51 1,212.12 5,939,867.888 899,981.206 0.00 0.00 3,916.02 34.61 122.26 3,537.15 SV3 122.28 3,606.27 3,519.12 -825.97 1,252.46 5,939,843.499 700,O02.200 0.00 0.0 4,000.00 34.61 1,300.49 5,939,814.460 700,051.011 0.00 0.00 4,100.00 34.61 122.26 3,888.58 3,801.43 -656.29 1,328.84 5,939,797.321 700,079.819 0.00 D.00 4,159.02 34.61 122.26 3,737.15 3,650.00 -674.18 SV2 3,770.88 3,663.73 -666.61 1,348.52 5,839,785-420 700,099-822 0.00 0.00 4,200.00 34.61 122.26 3,766.03 -716.82 1,398.56 5,939,756.360 740,148.633 O.QO 0.00 4,300.00 34.61 122.28 3,853.18 1,444.59 5,939,727.341 700,197.444 0.00 0.00 4,400.00 34.61 122.26 3,935.49 3,848.34 -747.24 COMPASS 5000.1 Build 8 4/23/2019 3:04:31AM Page 5 Company; North America -ALASKA- BP Project: PBU Site: 01 well, 01-37 Wellbore PLAN 01-37 Design: 01-37 WP09 BP Well Plan Survey Report Local Co-ordinate Reference, TVD Reference MD Reference: North Reference Survey Calculation Mathod. Databaae. Well 01-37 Plan KB P272 @ 87 15usft (Plan KB P272) Plan KB P272 @ 87.15usft (Plan K13 P272) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Planned Survey FJW Northing fasting DLeg TFace MD Inc Am ?VD TVDSS NIS Iusm 111.1911111) (usft) (7001 ;117007sft} t°} (USM (0) (°) (usft) (usfti 1,492.62 5,939,698.301 700,246.255 O.DO 0.00 4,500.00 34.61 122.26 4,017.79 3,930.64 -777.56 1,540.65 5,939,869.261 700,295.066 000 0,00 4,600.00 34.61 122.26 4,100.09 4,012.94 -807.88 1,562.28 5,939,656.186 700,317.043 0.00 0.00I' 4,645.03 34.81 122.26 4,137.15 4,050.00 -821.53 SVi0.00 122.28 5,182.40 4,095.25 -838.20 1,588.68 5,839,840.222 700,343.877 0.00 0.00 4,700.00 34.81 4,264.70 4,177.55 -868.51 1,636.71 5,939,511.182 700,392.688 0.00 4,800.00 34.81 122.26 1,684.74 5,939,582.142 700,441.499 0.00 0.00 4,900.00 34.61 122.26 4,347.00 4,259.85 -698.83 1,732.77 5,939,553.103 700,490.309 0.00 0.00 5,000.00 34.fi1 122.28 4,429.31 4,342.16 -929.15 1,780.80 5,939,525.083 700,539.120 0,00 0.00 5,106.00 34.61 122.26 4,511.61 4,424.46 -959.47 1,828.84 5,939,495.023 700,587.931 0.00 0.00 5,200.00 34.61 122.25 4,593.91 4,506.76 -989.79 -1,020.10 1,876.87 5,939,465.984 700,638.742 0.00 0.00 5,300.00 34.61 122.26 4,676.22 4,589.07 0.00 0.00 122.26 4,727.15 4,640.00 -1,038.87 1,906.59 5,939,448.012 706,668.950 5,381.89 34.81 UG4046.97 4,749.15 4,882.00 1, 1,919.43 5,939,440.250 700,679.997 0.00 0.00 5,388.62 34.61 122.26 UG4A 122.26 4,758.52 4,671.37 -1,050.42 1,924.90 5,939,436.944 700,685.553 0.00 0.00 0.00 5,400.00 34.61 4,753.67 -1,080.74 1,972.93 5,939,407.905 700,734.364 0.00 5,500.00 34.61 122.26 4,840.82 -1,111.06 2,020.96 5,939,378.865 700,783.175 0.00 0.06 5,800.00 34.61 122.28 4,923.13 4,835.98 0.001 122.26 4,937.15 4,850.00 -1,116.22 2,029.14 5,939,373.916 700,791.493 0.00 5,617.04 34.81 UG30.00 5,005.43 4,918.28 1,141.38 2,088.89 5,939,349.825 700,831.986 0.00 '1 5,700.00 34.81 122.26 5,000.58 -1,1711.69 2,117.62 5,939,320.786 700,880.797 0.00 0.00 5,800.00 34.61 122.26 5,087.73 -1,202.01 2,165.05 5,939,291.746 700,929.608 0.00 0.00 5,900.00 34.61 1122.26 5,170.04 5,082.89 2,213.08 5,939,262.706 700,978.419 0.00 0.00 6,000.00 34.61 122.26 5,252.34 5,165.19 -1,232.33 0.00 6.06 34.61 122.28 5,334.64 5,247.49 -1,262.85 2,281.11 5,939,233.667 761,027.230 0.00 0.00 8,100.00 5,418.95-1,323.28 -1,292.97 2,309.15 5,939,204.627 701,076.041 6,200.00 34.81 122.28 5,412.10 -1,323.28 2,357.18 5,939,175.587 701,124.852 0.00 0.00 6,300.00 34.81 122.26 5,499.25 1,353.80 2,405.21 5,939,146.548 701,173.663 0.00 0.00 8,400.00 34.61 122.26 5,581.55 5,494.40 COMPASS 5000. i Build 81D 4/2311019 3:04.11AM Page 6 BP 0 by Well Plan Survey Report Company. North America - ALASKA - BP Local Co-ordinate Reference Well 01-37 Project: PBU ND Reference! plan K6 P272 ® 87.15usft (Plan KB P272) Site 91 MD Reference- Plan KS P272 @ 87.150sft (Plan KS P272) Well: 01-37 North Reference True Wellbore, PLAN 01-37 Survey Calculation Method Minimum Curvature Design: 01-37 WP09 Database EOM R5K- Alaska PROD - ANCP1 Planned Survey MD Inc An TVD WOW NIS EfW Northing Easting DLeg TFace Nam 1°) 1°) (usft) (ush) (waft) (usfq quem (-ft) (°1100usft) {°) 6,500.00 34.61 122.26 5,683.86 5,576.71 -1,383.92 2,453.24 5,939,117.508 701,222.473 0.00 0.00 6,589.05 34.61 122.26 5,737.15 5,650.00 -1,410.92 2,496.01 5,939,091.647 701,265.942 0.00 0.00 UG1 6,600.00 34.61 122.26 5,746.16 5,659.01 -1,414.24 2,501.27 5,939,086,469 701,271.284 0.00 0.00 6,700.00 34.81 122.26 5,828.46 5,741.31 -1,444.56 2,549.30 5,939,059.429 701,320.095 0.00 0.00 6,800.00 34.61 122.26 5,910.77 5,823.62 -1,474.87 2,597.33 5,939,030.389 701,368.906 0.00 0.00 6,900.00 34.61 122.26 5,993.07 5,905.92 -1,505.19 2,845.36 5,939,001.350 701,417.717 0.00 0.00 7,000.00 34.61 122.26 6,075.37 5,988.22 -1,535.51 2,693.39 5,938,972.310 701,466.528 0.00 0.00 7,100.00 34.61 122.28 8,157.68 6,070.53 -1,565.83 2,741.43 5,938,943.270 701,515.339 0.00 0.00 i 7,143.10 34.61 122.26 6,193.15 6,106.00 -1,578.90 2,762.13 5,938,930.753 701,536.378 0.00 0.00 W32 7,200.00 34.61 122.26 8,239.98 6,152.83 -1,596.15 2,789.46 5,938,914.231 701,564.150 0.00 0.00 7,300.00 34.61 122.28 6,322.28 6,235.13 -1,626.46 2,837.49 5,938,885.191 701,612.961 0.00 0.00 7,400.00 34.61 122.26 6,404.59 6,317.44 -1,656.78 2,885.52 5,938,856.151 701,661.772 0.00 0.00 7,451.72 34.61 122.26 6,447.15 6,360.00 -1,672.46 2,910.36 5,938,841.133 701,687.015 0.00 0.00 WS1 7,500.00 34,81 122.26 6,486.89 6,399.74 -1,687.10 2,933.55 5,938,827.112 701,710.583 0.00 0.00 7,600.00 34.61 122.26 6,569.19 6,482.04 -1,717.42 2,981.58 5,938,798.072 701,759.394 0.00 0.00 7,700.00 34.61 122.26 6,851.50 6,564.35 -1,747.74 3,029.61 5,938,769.032 701,808.205 0.00 0.00 7,767.62 34.61 122.26 6,707.15 6,620.00 -1,768.24 3,082.09 5,938,749.395 701,841.211 0.00 o.ao CM3 7,800.00 34.61 122.25 6,733.80 6,646.65 -1,778.05 3,077.64 5,938,739.993 701,857.016 0.00 0.00 7,900.00 34.61 122.26 6,816.10 6,728.95 -1,808.37 3,125.67 5,938,710.953 701,905.827 0.00 0.00 6,000.00 34.51 122.26 6,898.40 6,811.25 -1,838.69 3,173.70 5,938,681.914 701,954.637 0.00 0.001 8,10a.ao 34.61 122.26 6,980.71 6,893.56 -1,869.01 3,221.74 5,938,652.874 702,003.448 0.00 0.001 8,200.00 34.61 122.26 7,063.01 6,975.86 -1,899.33 3,269.77 5,938,623.834 702,052.259 0.00 0.001, 8,300.00 34.61 122.26 7,145.31 7,058.16 -1,929.64 3,317.80 5,938,594195 702,101.070 0.00 0,00 412312019 3:04:31AM Page 7 COMPASS 5000.1 Build 81D BP 0 by Well Plan Survey Report Local Co-ordinate Reference Well 01-37 Company' North America - ALASKA - BP TVD Reference, Plan KB P272 Q 87.15usft (elan KB P272) Prolact PBU MD Reference Plan KB P272 C 87.15usft (plan KB P272) Sita= 01 North Reference True Walk 01-37 WalkWal Survey Calculation Method: Minimum Curvature PLAN 91-37 yore: PLAN Database' EDM R5K-Alaska PROD -ANCP1 Dastgn: WP09 Planned Survey MD Inc Azi ND TV0SS ft1S EIVH Northing Easting DLeg TPace (°I (°I (usf" (usf4 (usfq (usftl Waft) (usft) rmoovsft) (rift) (°) 34.61 122.26 7,162.15 7,075.00 -1,935.85 3,327.62 5,938,588.855 702,111.054 0.00 0.00 8,320.45 CM2 34.61 122.26 7,227.62 71140.47 -1,959.96 3,365.83 5,938,565.755 702,149.881 0.00 0,00 8,400.00 7,309.92 7,222.77 -1,990.28 3,413.86 5,938,536.715 702,198.692 0.00 0.00 8,500.00 34.61 122.26 34.61 122.26 7,372.50 7,285.35 -2,013.33 3,450.38 5,938,514.635 702,235.805 0.00 0.00 8,576.03 Start DLS 3.00 7FO.111.24 121.07 7,392.26 7,305.11 -2,020.46 3,461.93 5,938,507.819 702,247.536 3.00 111.24 8,600.00 34.36 33.42 115.96 7,475.28 7,388.13 -2,047.08 3,510.87 5,938,482.496 702,297.157 3.00 -110.26 8,700.00 32.71 110.62 7,559.11 7,471.96 -2,068.65 3,560.92 5,938,462.251 702,347.764 3.00 -106.02 8,800.00 7,643.50 7,556.35 -2,085.12 3,611.96 5,938,447.142 702,399.216 3.00 -101.54 8,900.00 32.22 105.10 9,000.00 31.99 99.47 7,728.22 7,641.07 -2,096.42 3,663.84 5,938,437.208 702,451.373 3.00 -96.88 9,100.00 32.00 93.81 7,813.05 7,725.90 -2,102.54 3,716.42 5,938,432.477 702,504.093 3.00 -92.11 32.27 88.19 7,897.75 7,810.60 -2,103.46 3,769.56 5,938,432.963 702,557.230 3.00 -87.31 9,200.00 9,300.00 32.78 82.69 7,982.08 7,894.93 -2,099.16 3,823.10 5,938,438.664 702,610.639 3.00 42.55 9,400,00 33.52 77.37 8,055.82 7,978.67 -2,089.68 3,876.91 5,938,449.583 702,864.174 3.00 -77.91 9,500.00 34.48 72.29 8,148.74 8,061.59 -2,075.03 3,930.83 5,938,465.632 702,717.688 3.00 -73.48 9,546.74 35.00 70.00 8,187.15 8,100.00 -2,088.42 3,956.03 5,938,474.903 702,742.650 3.00 -69.24 Start 631.04 hold at 9546.74 MD - CM1 8,230.78 8,143.63 -2,055,97 3,984.74 5,938,486.105 702,771.071 0.00 0.00 9,600.00 35.00 70.00 70.00 8,312.70 8,225.55 -2,036.35 4,038.64 5,938,507.135 702,824.431 0.00 0.00 9,700.00 35.00 70.00 8,352.15 8,275.00 -2,024.51 4,071.18 5,938,519.832 702,656.645 0.00 0.00 9,760.37 35.00 THRZ 35.00 70.00 8,394.61 8,307.46 -2,016.73 4,092.53 5,938,528.166 702,877.790 0.00 0.00 9,800.00 70.00 8,476.53 8,389.38 -1,997.11 4,146.43 5,938,549.198 702,931.150 0.00 0.00 9,900.00 35.00 70.00 8,487.15 8,400.00 -1,994.57 4,153.42 5,938,551.924 702,938.070 0.00 0.00 9,912.97 35.00 BHRY 35.00 70.00 8,517.15 8,430.00 -1,987.39 4,173.16 5,938,559.626 702,957,6`12 0.00 0,0 9,949.59 LCU COMPASS 5000.': Build 81D 4/2312019 3:04:31AM Page 8 BP Well Plan SuRey Report Company: North America - ALASKA- 13P Local Co-ordinate Reference Well 01-37 Plan KB P272 ® 87.15usft (Plan KB P272) Project PBU TVD Reference, MD Reference, Plan KB P272 @ 87.15usft (Plan KB P272) Site. U1 Well; 01-37 North Reference. True Survey Calculation Method Minimum Curvature PLAN 01-37 Wellbore PLAN Database. EDM R5K - Alaska PROD - ANCP1 Design: WP09 Planned Surmry Inc Azr TVD TVDSS NIS WIN Northing Easting DLeg TFaca MD (°) (usft) (usft) (usft) (usfo (usft) (usft) (°110cusm (°) (usfq r) 9,998.42 35.00 70.00 8,557.15 8,470.00 -1,977.81 4,199.48 5,938,569.895 702,963.668 0.00 0.00 TJA 10,000.00 35.00 70.00 8,558.44 8,471.29 -1,977.50 4,200.33 5,938,570.226 702,984.510 0.00 0.00 10,077.77 35.00 70.00 8,622.15 8,535.00 -1,962.24 4,242.25 5,938,586.583 703,026.010 0.00 0.00 Start 21.69 hold at 10077.77 MD - TSGR - 7 8,639.91 8,552.78 -1,957.99 4,253.94 5,938,591.143 703,037.582 0,00 0.00 10,099.46 35.00 70.00 Start Build 5.50 35.04 70.00 8,640.36 8,553.21 -1,957.88 4,254.23 5,938,591.257 703,037.869 6.50 0.00 10,100.00 10,114.49 35.98 70.00 8,652.15 8,565.00 -1,955.00 4,262.14 5,938,594.342 703,045.697 5.50 0.00 TSHU 10,i97.79 41.39 70.00 8,717.15 8,630.00 -1,937.20 4,311.04 5,938,613.424 703,094.114 6.50 0.00 TSAD 41.54 70.00 8,718.B1 8,631.68 -1,936.70 4,312.42 5,938,613.962 703,095.477 6.50 0.00 10,200.00 48.04 70.00 8,789.75 8,702.80 -1,912.62 4,378.58 5,938,539.777 703,180.977 6.50 0.00 10,300.00 53.97 70.00 8,847.15 8,760.00 -1,888.37 4,445.20 5,938,665.769 703,226.927 6,50 0.001 10,391.28 42N 10,400.00 54.54 70.00 8,852.26 8,765.11 -1,885.95 4,451.86 5,938,668.370 703,233.526 6.50 0.00 10,493.05 60.58 70.00 8,902.15 8,815.00 1,859.10 4,525.62 5,938,697.151 703,306.551 6.50 0.00 i TCGL 61.04 70.00 8,905.54 8,818.39 -1,857.03 4,531.32 5,938,699.375 703,312.192 6.50 0.00 10,500.00 67.54 70.00 8,948.90 8,861.75 -1,826.23 4,615.94 5,938,732.391 703,395.964 8.50 0.00 10,600.00 68.98 70.00 8,957.15 8,870.00 -1,819.16 4,635.37 5,938,739.973 703,415.200 6.50 0.00 10,622.26 BCGL 74.04 70.00 8,981.80 8,894.65 -1,793.95 4,704.63 5,938,766.995 703,483.764 6.50 0.0 10,700.00 10,804.00 80.54 70.00 9,003.60 8,916.65 -1,760.60 4,798.24 5,938,802.742 703,574.464 6.50 0.00 10,900.00 87.04 70.00 9,014.62 8,927.47 -1,726.62 4,889.61 5,938,839.173 703,668.897 6.50 0.00 87.81 70.00 9,015.15 8,928.00 -1,722.57 4,900.75 5,938,843.519 703,677.925 8.50 0.00 10,911.87 Landing Point (Mid -2C) COMPASS 5000. -j Build 81D 4123/2019 3:04:31AM Page 9 BP 0 by Well Plan Surrey Report Local Co-ordinate Reference. Well 01-37 Company- North America - ALASKA - BP TVD Reference. Plan KB P272 Q 87.15usft (Plan KB P272) project PBU MD Reference Plan KB P272 ® 87.15usft (Plan KB P272) Site. 01 North Reference True Well: 01-37 Survey Calculation Method: Minimum Curvature Wellbore' PLAN 01-37 Database EDM R5K - Alaska PROD - ANCP1 Design, 01-37 WP09 Planned Survey Inc Am ND 7VDSS NIS En Northing Easting DLeg TFace MD (1 (usft) (usft) (waft) (us ! (usfq Wall) (°I100usft) (°) (usft) (°) 80.00 70.00 9,015.80 8,928.65 -1,711.03 4,932.45 5,938,855.890 703,709.313 6.50 0.00 10,945.61 Start Build 2.000.00 9,015.28 e,92B.13 -1,692.43 4,983.56 5,938,875.830 703,759.905 2.00 11,000.00 91.09 70.00 11,100.00 93.09 70.00 9,011.64 8,924.49 -1,658.25 5,077.46 5,938,912.469 703,852.868 2.00 0.00 11,200.00 95.09 70.00 9,004.51 8,917.36 -1,624.14 5,171.18 5,938,949.039 703,945.657 2.00 0.00 97.00 70.00 8,994.44 8,907.29 -1,591.62 5,260.53 5,938,983.900 704,034.108 2.00 0-00 11,285.61 Start 230.00 hold at 11295.01 MD 70.00 8,993.91 8,908.76 -1,590.13 5,264.82 5,938,985.496 704,038.158 0.00 0.001, 11,300.00 97.00 70.00 8,981.72 8,894.57 -1,556.18 5,357.89 5,939,021.688 704,130.494 0.00 0.00 11,400.00 97.00 11,500.00 97.00 70.00 8,969.53 8,882.38 -1,522.23 5,451.16 5,939,058.280 704,222.830 0.00 0.00 11,525.61 97.00 70.00 8,966.41 8,879.26 -1,513.54 5,475.05 5,939,067.602 704,246.482 0.00 0.00 Start Tum -2.62 97.00 68.13 8,957.35 8,870.20 -1,487.16 5,544.00 5,939,095.791 704,314.712 2.50 -89.89 11,600.00 97.00 55.61 8,945.16 8,858.01 -1,448.16 5,635.27 5,939,137.174 704,404.913 2.50 89.85 11,700.00 63.09 8,932.97 8,845.82 -1,405.20 5,724.73 5,939,182.484 704,493.207 2.50 -89.85: 11,800.00 97.00 11,900.00 97.00 60.57 8,920.78 8,833.64 -1,358.34 5,812.22 5,939,231.631 704,579.424 2.50 -89.851 12,000.00 97.00 58.05 8,908.60 8,821.45 -1,307.67 5,897.56 5,939,284.522 704,653.396 2.50 -89.85 12,100.00 87.00 55.53 5,896.41 8,809.26 -1,253.31 5,980.59 5,939,341.054 704,744.962 2.50 -89.85 12,125.61 97.00 54.88 8,893.29 8,806.14 -1,238.80 8,001.47 5,939,356.107 704,765.448 2,50 -89.96 Start 333.00 hold at 12125.61 MD 8,864.23 8,797.08 -1,196.33 6,061.86 5,939,400.156 704,824.694 0.00 0.00 12,200.00 97.00 54.88 12,300.00 97.00 54.88 8,872.04 8,784.89 -1,139.23 6,143.04 5,939,459.374 704,904.341 0.00 0.00 97.00 54.88 8,859.85 8,772.70 -1,082.13 6,224.23 5,939,518.591 704,983.989 0.00 0.00 12,400.00 97.00 54.88 8,652.71 8,765.56 -1,048.66 6,271.81 5,939,553.301 705,030.673 0.00 0.00 12,458.51 Start Turn -3.02 53.53 8,847.66 8,760.51 -1,024.66 6,305.15 5,939,578.168 705,063.366 3.00 89. 12,500.00 97.00 8,835.48 8,748.33 -963.72 8,383.49 5,939,641.142 705,140.061 3,00 -89.82 12,600.00 97.00 50.61 12,700.00 97.00 47.59 8,823.29 8,736.14 -898.75 6,458.50 5,939,708.072 705,213.331 3.00 -89.82 COMPASS 5000.7 Build eiD 4/23/2019 3:04:31AM Page 10 Company: North America - ALASKA - BP Project: PSU TVDSS site 01 EIW Well: 01-37 Easting Wellbore PLAN 01-37 TFace Design, 01-37 WP09 (usfo Planned Survey (weft) MD Inc lusm (USM (°) 1°1100usftj 12,800.00 97.00 12,900.00 97.00 12, 908.61 97.00 Start 280.00 hold at 12908.81 MD 13,000.00 97.00 13,100.00 97.00 13,158.61 97.00 Start DLS 4.00 TFO 180.00 13,200.00 95.34 13,300.00 91.34 13, 333.61 90.00 Start DLS 4.00 TFO 180.00 8,710.72 13,400.00 87.34 13,500.00 83.34 13,600.00 79.34 13,700.00 75.34 13,800.00 71.34 13,833.61 70.00 Start 421.76 hold at 13833.61 MD 13,900.00 70.00 14,000.00 70.00 14,100.00 70.00 14,200.00 70.00 14,254.77 70.00 TD at 14254.77 41.29 BP Well Plan Survey Report Local Coordinate Reference, Well 01-37 ND Reference Plan KB P272 Q 87.15usft (Plan K8 P272) MD ReferencePlan KB P272 Q 87.1 Susft (Plan KB P272) North Reference- True Survey Calculation Method. Minimum Curvature Database EDM R5K- Alaska PROD -ANCP1 Azl ND TVDSS NIS EIW Northing Easting DI -09 TFace 8786.38 (usfo (usft) (weft) (ust" lusm Waft) 1°1100usftj 8,781.42 44.57 8,811.10 8,723.95 -829.91 6,529.99 5,939,778.769 705,282.973 3.00 -89.82 41.55 8,798.91 8,711.76 -757.40 6,597.74 5,939,853.036 705,348.794 3.00 49.80 41.29 8,797.87 8,710.72 -750.98 6,603.40 5,939,859.595 705,354.280 3.00 -90.17 41.29 8,786.73 8,699.58 -682.83 6,863.25 5,939,929.299 705,412.312 0.00 0.00 41.29 8,774.54 8,687.39 -608.25 6,728.75 5,940,005.573 705,475.815 0.00 0,00 41.29 8,767.40 8,680.25 -564.54 8,767.14 5,940,050.281 705,513.037 0.00 0.00 41.29 8,762.95 8,675.80 -533.62 6,794.29 5,940,081.899 705,539.361 4.00 180.00 41.29 8,757.12 8,669.97 -458.63 6,860.15 5,940,158.600 705,603.219 4,00 -180.00 41.29 8,756.72 8,669.57 -433.37 6,882.33 5,940,184.429 705,624.723 4.00 -180.00 41.29 8,758.26 8,671.11 -383.51 6,9213.12 5,940,235.426 705,667.181 4.00 41.29 8786.38 6,679.23 -308.64 6,991.88 5,940,312.004 705,730.937 4.00 41.29 8,781.42 8,694.27 -234.37 7,057.10 5,940,387.961 705,794.175 4.00 41.29 8,803.33 8,716.18 -161.07 7,121.47 5,940,462.926 705,856.588 4.00 41.29 8,831.98 8,744.83 -89.10 7,184.68 5,940,536.534 705,917.871 4.00 41.29 8,843.11 8,755.96 -65.27 7,205.81 5,940,560.910 705,938.165 4.00 41.29 8,985.81 8,778.66 -18.40 7,245.77 5,940,608.848 705,978.078 0.00 41.29 6,900.01 8,812.86 52.21 7,308.78 5,940,681.061 706,038.198 0.00 41.29 8,934.22 8,847.07 122.82 7,370.78 5,940,753.274 706,098.319 0,00 41.29 8,988.42 8,881.27 193.42 7,432.79 5,940,825.487 705,158.440 0.00 41.29 8,987.15 8,900.00 232.09 7,466.75 5,940,865.037 706091.368 0,0D 180.00 -180.00 -180.00 :. -180.00 -180.00 180.00 0.00 0.00 I: 0.00 13.00 0.00 i 4/23/2019 3:04:31AM ?age 11 COMPASS 5000.1 BU#d 81D Company- NorthAmerica- ALASKA - BP Project: PBU S1Ye. 01 WOR. 01-37 wellborn. PLAN 01-37 Designs 01-37 WP09 Casing Points Plan Annotations BP Well Plan Survey Report Local Coordinate Reference: TVD Reference MD Reference; North Refararice Survey Calculation Method: Database Vertical Casing Hole Measured Vertical Diameter Diameter Depth Depth (In) (in) Waft) (usR) Name 10.750 13.500 3,855.26 3,487.15 10 311V 7.000 9.875 10,077.77 8,622.15 7" 4.500 6.125 14,254.77 6,987.15 4112" 11,295.61 8,994.44 Measured Vertical Depth Depth (uslit) (USM 500.00 500.00 1,000.00 999.37 1,300.013 1,296.31 1,800.00 1,585.10 2,277.85 2,188.88 8,576.03 7,372.50 9,546.74 8,187.15 10,077.77 8,622.15 10,099.45 8,639.91 10,945.61 9,015.80 11,295.61 8,994.44 11,525.61 8,966.41 12,125.61 8,893.29 12,458.61 8,852.71 12,908.61 8,797.87 13,158.61 8,767.40 13,333.61 8,756.72 13,833.61 8,843.11 14,254.77 8,987.15 Local Coordinates +N! -S +EI -W (usft) (usft) Comment 0.00 0.00 Start Build 1.00 0.00 21.80 Start Build 2.00 0.00 63.54 Start Build 3.00 0.00 143.62 Start DLS 3.00 TFO 60.74 -103.85 425.30 Start 8298.19 hold at 2277.85 MD -2,013.33 3,450.38 Start OLS 3.00 TFO -111.24 -2,068,42 3,958.03 Start 531.04 hold at 9546.74 MD -1,962.24 4,242.25 Start 21.69 hold at 10077.77 MD -1,957.99 4,253.94 Start Build 6.50 -1,711.03 4,932.45 Start Build 2.00 -1,591.62 5,260.53 Start 230.00 hold at 11295.81 MD -1,513.54 5,475.05 Start Tum -2.52 -1,238.80 6,001.47 Start 333.00 hold at 12125.61 MD -1,048.66 5,271.81 Start Tum -3.02 -750.98 6,603.40 Start 250.00 hold at 12905.81 MD -564,54 6,767.14 Start DLS 4.00 TFO 180.00 -433.37 6,882.33 Start DLS 4.00 TFO 180.00 -65,27 7,205.61 Start 421.15 hold at 13833.61 MD 232.09 7,466.75 TO at 14254.77 Well 01-37 Plan K8 1272 @ 87.15usft (Plan KB P272) Plan KB P272 C 87.15usft (Plan KB P272) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 COMPASS 5000.1 Build 810 412311019 3:04:31AM Page 12 Obp North America - ALASKA - BP PBU 01 01-37 PLAN 01-37 01-37 WP09 Anticollision Summary Deport 23 April, 2019 company; North America -ALASKA- BP project PBU Reference Site' 01 Site Error 0.00usft Reference We11, 01-37 Well Error! 0.00usft Reference Wellbore PLAN 01-37 n....:.... nl-A7 vuPnQ BP Anticollision Report Local Co-ordinate Reference TVD Reference MD Reference North Reference. Surrey Calculation Method Output errors are at Database Offset TVD Reference - Well 01-37 Plan KB P272 Q 87.15usft (Plan KB P272) Plan KB P272 @ 87.15usft (Plan KB P272) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 01-37 WP09 Filter type,. NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,621.27usft Error Surface: Elliptical Conic Survey Tool Program Data 4!23!2019 From (uaft) To (usft) Survey (Wellbore) Tool Name Descnptwn 42.05 400.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 42.05 400.00 01-37 WP09 (PLAN 0137) GYD-GCSS Gymdata gyro single shots 400.00 700.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 400.00 700.00 01-37 WP09 (PLAN 01 -37) GYD-GC-SS Gyrodata gyro single shots 700.00 1,000.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 700.00 1,000.05 01-37 WP09 (PLAN 01-37) GYD-GC-SS Gyrodata gyro single shots 1,000.00 1,400.00 01-37 WP09 (PLAN 01-37) BLIND Blind drilling 1,000.00 1,400.00 01-37 WP09 (PLAN 01 -37) GYD-GC-SS Gyrodata gyro single shots 1,400.00 3,855.00 01-37 WP09 (PLAN 01-37) MWD MWD+IFR+MS-WOCA MWD - Standard MWD + IFR + Multi Station W/O Crustal 1,400.00 3,855.00 01-37 WP09 (PLAN 0137) 3,855.00 10,078.00 01-37 WP09 (PLAN 01-37) MWD MWD+IFR+MS-WOCA MWD - Standard MWD + IFR + Mufti Station WIO Crustal 3,855.00 10,078.00 01-37 WP09 (PLAN 01 -37) 10,078.00 14,254.77 01-37 VVP09 (PLAN 01-37) MWD MWD+IFR+MS-MCA MWD - Standard MWD + IFR + Multi Station W/O Crustal 10,078.00 14,254.7! 01-37 WP09 (PLAN 01-37) 4/23/2019 2:11:3d4M Page 2 of 4 COMPASS 5000.1 Build 61D Company:. North America - ALASKA - BP Project PBU Reference Slte 01 Site Error: 0,00usft Reference Well, 01-37 Well Error 0.00usft Reference Wellbore PLAN 01-37 Reference Design. 01-37 WP09 '5 u0inlary site Ng:lnw offer: Wall - YYQilbore - f]cegr� O1 01-01A- 01-01A- 01-01A 01-01A- 01-01B - 01-01 B 01-02 - 01-02 - 01-02 01-03 - 01-03- 01-03 01-03 - 01-03A- 01-03A 01-04 - 01-04 - 01-04 01-04 - 01-04A- 01-04A 01-04 - 01-046 - 01-04B 01-05 - 01-05 - 01-05 01-05 - 01-05B - 01-05B 01-05 - 01-05PBI - 01-05PB1 01-06 - 01-06 - 01-06 01-06 - 01-06A- 01-OBA 01-09 - 01-09 - 01-09 01-09 - 01-09A- 01-09A 01-12 - 01-12 - 01-12 01-12 - 01-12A - 01-12A 01-26 - 01-26 - 01-26 01-26 - 01-28A- 01-26A 01-35 - 01-36 - 01-36 01-36 - 01-38 - 01-36 WP16 03 03-16 - 03-16A - 03-16A 03-22 - 03-22 - 03-22 03-22 - 03-22A - 03-22A 03-24 - 03-248 - 032413 03-25 - 03-25 - 03-25 03-25 - 03-25A - 03-25A BP Antioollision Report Local Co-ordinate Reference - TVD Reference: MD Reference., North Reference. Survey Calculation Method° Output errors are at Database Offset TVD Reference' Well 01-37 Plan KB P272 87 15usft (Plan KB P272) Plan KB P272 87 15usft (Plan KB P272) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference Offset Centre to No -Go Allowable Pass - Major Risk Measured Measured Centre Distance Deviabon Warning Depth Depth Distance Waft) from Plan Pass - Major Risk (usft) (usft) (usttl 290.12 (usip Pass - Major Risk 999.31 975.00 480.20 23.18 457.02 Pass - Minor 11200 999.31 975.00 480.20 23.18 457.02 Pass - Miner 1/200 983.37 975.00 304.38 39.91 264.47 Pass - Major Risk 985.55 975.00 183.65 39.04 144.62 Pass - Major Risk 995.83 975.00 183.87 40.33 143.54 Pass - Major Risk 988.88 975.00 65.98 44.07 21.92 Pass - Major Risk 986.68 975.00 65.98 44.07 21.92 Pass - Major Risk 995.88 1,000.00 66.44 45.27 21.18 Pass - Major Risk 989.07 975.00 59,19 22.51 36.69 Pass - Minor 11200 994.24 975.00 59.23 39.51 19.73 Pass - Major Risk 989.07 975.00 59.19 22.51 36.69 Pass - Minor 11200 1,386.74 1,375.00 240.92 42.56 198.70 Pass - Major Risk 1,393.50 1,375.00 241.19 43.37 198.17 Pass - Major Risk 5,195.40 5,400.00 397.33 81.22 320.41 Pass - Minor 1/200 5,200.69 5,400.00 397.53 81.27 320.42 Pass - Minor 1/200 389.15 375.00 715.78 17.96 697.82 Pass- Minor 1/200 11,547.23 11,300.00 1,076.15 1,055.69 55.41 Pass - Major Risk 9,223.77 9,825.00 803.01 871.08 391.76 Pass - Major Risk 9,231.58 9,825.00 802.22 871.18 391.75 Pass - Major Risk 398.42 400.00 151.98 25.68 125.28 Pass - Major Risk 401.14 400.00 149.85 25.91 123.95 Pass - Major Risk 13,071.48 15,311.00 976.78 329.27 658.83 Pass - Major Risk 11,479.04 13,360.00 953.22 279.84 682.90 Pass - Major Risk 11,641.67 13,052.00 967.54 273.05 894.41 Pass - Major Risk 11,163.47 14,804.00 1,228.50 290.12 941.54 Pass - Major Risk Out of range 14,204.42 12,395.00 944.15 305.79 638,21 Pass - Major Risk 412312019 2:11:36AM Page 3 of 4 COMPASS 5000.1 Suits 81D company; North America - ALASKA- BP Project; PBU Reference S1W 01 Site Error 0.00usft Reference Well 01-37 Well Error: 0.00usR Reference Wallbore PLAN 01-37 Reference Design- 01-37 WP09 BP Anticoliision Report Local Co-ordinate Reference: N0 References MD Reference: North Reference. Survey Calculation illethod, Output errors are at Database Offset TVD Reference, Well 01-37 Plan KB P272 @ 87.15usft (Plan KB P272) Plan KB P272 @ 87.15usft (Plan KB P272) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum teferenoe Depths are relative to Plan KB P272 @ 87.15usft (Plan KB Coordinates are relative to: 0137 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK ventral Meridian is 150° 0' 0.000 W' Grid Convergence at Surface is: 1.5V 1 Ladder Plot 0 2500 5000 7500 10000 125UU 15UUU Measured Depth (2500 usfflm) 01-04,01-04A,01-04AV7 —A• 03-16,03-16A,03-1 BA V5 —4— 01-09,01-09A,01-0gAV1 $ 01-04,01-04B4O1-04BV0 03,24,03-248,03-24BV0 01-09,01-09,01-09V2 $ 01-04,01-04,01-04V2 —0— 01 -01 A, 01 -0 1 A, 01 -01 A V7 $ 03-25,03-25,03-25V1 �E• 01-05,01-05PB1,01-05MIV2 $ 01-01 A, 01-018.01-WElV6 —IIE 0325,03-25A,03-25AV1 —� 01-05,01-058,01-05BV11 $ 01-06,01-06,01-06V1 $ 01-36,01-36,0136WP16 V0 �} 01-05,01-05,01-05V3 $ 01-06,01-06A,01-06AV1 $ 01-36,01-36,0136V(l $ 01-12,01-12,01-12V3 01 -03,01-03A, 01 -03A V1 01-02,01-02,01-02V2 $ 0 1 -1 2,01-12A, 0 1 -1 2A V3 —fir- 01-03,01-03,01-03V2 $ 0137V4P08 2:41:36AM -.4 .) r COMPASS 5000.1 Build 81D Pr0je51 PBM Sltr 01 Wool 01-7 WOOFS PLAN01-37 Design 01.87WP08 ' SECTION DETAILS WELLBORE DETAILS PLAN 01-37 RBIa*NM NF0"TION Sec MD Inc Am TVD +14)-5 +EiNVX Dlap TFace VSed 1 4205 0.00 9 DO 42 D5 0.00 0 DO 000 0 DO 000 2 560.60 0-00 000 500.00 0.00 0.D0 0.00 O DO 0.00 3 1000 00 5.00 90.06 999.37 0.00 2180 1.60 90.00 2106 4 13DO.90 11.00 90.00 129631 0-00 6354 2.00 0.00 6137 5 1606 -DO 2000 90,00 158510 000 14362 3.D0 0.00 138 73 6 2277 M 3461 122.26 2188 08 -103:05 425.311 3.00 60.74 38393 7 8576 D3 34.61 12226 7372 50 -2013.33 345038 0.00 0.00 281172 8 0674 35.00 7000 818715 -2086.42 3856 D3 3.00 -11124 32M 40 9 10077 77 3500 7600 862215 -1962.24 4242.25 0.00 000 3589.83 10 1009945 35.00 70.00 8639.91 -1957.99 4253.94 000 0.00 360223 11 18945.61 9000 70.00 901580 -1711.03 4M2A5 6.50 0.00 432154 12 1129661 9700 70.00 OBR44 -1591.62 526053 200 0.00 466934 13 11525 61 9700 7000 8966 41 -151354 547505 0.00 0.00 489676 14 12125.61 97.110 64.88 8893.29 -1238 80 600147 250 -90.00 547635 15 12458.51 97.00 5488 8652 TI -104&66 627181 0.00 O.DO 5786.70 16 1280&61 9700 4129 879767 75(198 66M40 3.00 -WOO 618403 17 13158.61 97.00 41.29 976740 -SU 54 676714 090 0-00 639044 18 13333.61 9000 41.29 8756.72 -433.37 6882 33 400 18D.00 6535.65 19 1383361 7008 41.29 8843.11 •6527 7205.61 400 18&00 694319 20 1425477 7000 4129 696715 232.D9 7466.75 0 D (LOU 1272.40 0 Vertical Section at 75,001 (600 usitlin) Sten Build LDO Gl Srsrt Build,z00 il%MBuid 3.00 17.011' SWnDLS3.0077060.74 MOD BPRFSm ' A:mliebTnellom WELLBORE DETAILS PLAN 01-37 RBIa*NM NF0"TION WfU 01-37 WPO P mwwkNoeh-'bar Ihcn,kFeNi sbeNI�6T3e9 n -------'-- -- Par6td Wellbore NO Wellbore date l Tie on MO 9205 -'-----._.^ -_ IauaaelN�lRdwence *Mal-7'f"Nom VwkWaMR�'°� �' KBP2720V.15udt(� NB Sm%m IVs)RebmM Blot-tOMKO oE) Ka P272@8715ue6;T'IeaK8 P77a', P272i -- -.-_- SU EYPROGRAlA om.. 12m8 CASINGOErNCa 42DD Mbewved Depth Rder PW Tod BLIND S { ilpdetlYlG1®18 MD I7D4A (?e1'4�tiBr K6hod AhnmImCllVdul9 - LIDS 400.00 706.00 0137WP091PL.AN0137j R 540 -- 1200 LIG / StmWLS 3.00 TFO -111.24 ANNOTATIONS 700.OD 1000.OG 0137WP09(P 0137) BLIND 6110 7MA JOOD.00 0137WP08SPLAN0137j m- 7 MIR WS I TVD MD Adnota8on o 4112" 500.00 500.00 StadBuia1.00 999.37 1000.00 SWBd1d2.00 1296.31 1300,04 ShOB413.00 1585.16 1600,00 SMOLS3A0TFO60.74 2188.88 2277.85 S1ad6298.19holdat2277.85MD 7372.50 8576.03 StariDLS3.00TFO-111.24 8187.15 9546.74 SM531A4holdat9546.74MD 8622.15 10077.77 &3it21.69h0I7attO077.77MD 8639.91 10099.46 ShftBU0d6.50 9015,80 10945.61 uftd9uild2.00 89944411295.61 NaIt230.010holdat11295.61 NU 11966.41 11525.61 Stadium -2.52 88932912125.61 W333.00hold at12125.61MD 8852.71 1245B.61 StartTum-3.02 8797.87 12908.61 Stad250.00 hold atl2908.61 MO 8767.40 13168.61 StutDLS4.00TFO180.00 8756,72 13333.61 SbrtDLS4.00TFO180.00 8843.11 131133.61 StaA421.15holdat13833.61M 8987.15 t4254.77 TDat1425437 _ 0 .a o ID3w° C -130 7" West( -)/East(+) 01'-'37 WPO9 01-3717au113 4 112" 01 STT6 TD at 14254.77 01-3778tart421. 15 holdat 1383361 MD 01-37 Fault4 StartDLS4.00TF0 181100 Slam DLS4 OOTFO 150.00 91%mnf. 01-37T4 Stanli0,00ho1dat12909.61MD 01-37 Poh'Ban SLan155m-3.02 01.37Pmih2 O.L-3773 .$tart33300hold et12125.6Lt D 01.3772 St lTnrn-2.52 OS -3771 SM23000holdat 11295.61 MD Stan Byild6.50 StaaBuild200 7 T � a [T J �1 ti Oo 0 0 o e o o a a a o 0 0 0 0 0 0 0 SV6 300 WfU 01-37 WPO 61st y ]9 4� 714° 360D SV3 -- -.-_- SU EYPROGRAlA M CASINGOErNCa 42DD SV1 Tod BLIND S T .-- MO Name 3487.16 385525 10314' �, 98621610077.77 T' 3¢e 10.759 7000 4.500 MD I7D4A 6087 15 14254 77 4 14' �- LIDS 400.00 706.00 0137WP091PL.AN0137j R 540 -- LIG / StmWLS 3.00 TFO -111.24 700.OD 1000.OG 0137WP09(P 0137) BLIND W52 7MA JOOD.00 0137WP08SPLAN0137j GYDGZ:88 WS I Skmt531,04ho4dat9546.74MD 6600- N CM3 � 4' S1att21.69hold7t1007T.77MD CM2 r� Start Tum -3.02 100000 1400.00 01-3-WP09(R.PNO1-37j GYD{X153 i S4r[Build6.50 780d250.DOlwldatl29ORAIMD i� 7"•"-. S1adDL54.40TF0180.00 MWD CM1 '� ,� St.A42IA5holdetl383361MD ' "Oo, 1400.00 MOO 0141WP09FLAND1.37) A, + ,'_, . TD at 14254,71 41n" - 9D0 NMhgPomt(M,d-2Q ... 4,+... - StactBudd200 MWD•IFR+MSWOCA Srar1x30.00hoWet:11295.61 MA 14254.77 0137WP09{PIANO1.5) Start Tum -2.52 1020 Start333 00 holdat 12125.61 MD an KB P272 87.15uaR (Plan KB P272) J � O 8 N p yyNyO 8 N ppb ppb J S Vertical Section at 75,001 (600 usitlin) 0 .a o ID3w° C -130 7" West( -)/East(+) 01'-'37 WPO9 01-3717au113 4 112" 01 STT6 TD at 14254.77 01-3778tart421. 15 holdat 1383361 MD 01-37 Fault4 StartDLS4.00TF0 181100 Slam DLS4 OOTFO 150.00 91%mnf. 01-37T4 Stanli0,00ho1dat12909.61MD 01-37 Poh'Ban SLan155m-3.02 01.37Pmih2 O.L-3773 .$tart33300hold et12125.6Lt D 01.3772 St lTnrn-2.52 OS -3771 SM23000holdat 11295.61 MD Stan Byild6.50 StaaBuild200 7 T � a [T J �1 ti Oo 0 0 o e o o a a a o 0 0 0 0 0 0 0 West( -)/East(+) +NI -S +PAV Nore,m0 Ground Level Eea000 4000 Lamde Longpdak 61st 000 900 5940438,200 68879,0740 70'14128,810N 148'23'41862W -.-_- SU EYPROGRAlA CASINGOErNCa .. _ . - DeplhFrom DBpihTe SuIveAw 42Dj 4D000 0137WPOBFLPN01�971 Tod BLIND T .-- MO Name 3487.16 385525 10314' �, 98621610077.77 T' 3¢e 10.759 7000 4.500 d2 4O0,1p 0I-VWPOO(RAN0137) GYDGC-M 6087 15 14254 77 4 14' �- 400.00 706.00 0137WP091PL.AN0137j LUNO -- 4DO,00 700DO 0137WPOB(PLd O"I3 0YD4" 700.OD 1000.OG 0137WP09(P 0137) BLIND 7MA JOOD.00 0137WP08SPLAN0137j GYDGZ:88 1000AD 14DO.00 nt37WFo9pLANO1-37I BLIND 100000 1400.00 01-3-WP09(R.PNO1-37j GYD{X153 +40ox 38M00 al3'WPDO(PLPND+-37) MWD 1400.00 MOO 0141WP09FLAND1.37) MW1)4IFR+MS•WDCA 3&%W 10078.00 O137W'PO9(PLNJ0137) MWD I 389500 10D7800 0+ 37WP09(PLAN0137) MWD•IFR+MSWOCA l 14254.77 0137WP09{PIANO1.5) MWD LIOMDO 1O07800 1425477 Ot37WPD9"0'-vj MfWD M-NISMOCA J U1 ANTI-caLLISIONSETTINpS c�ommy OETAII.S North Amenca-AIASKA-BP Pmject P611 - - - — -� gulahonNlelhod NlmanumEurvslure by Sae 01 Interpolation Al Fm 42 5 70 14254 .2600 Errors stem ISCWSA LLIJ KRa PLA 9ep81 Ra Wd 4 (,,ant 1ionee 1 Seen W&W Trsv 21maer North 0 W�Nbor! PlAN01-37 ResuICz11m0anoe (,,ant I ErrorSOrlace Effpem,Conic artt1911 O1S7 WP08 Reference Plan 07-37 WP09 (91.373�1AN Dti37) Warning Method Rules Based -� L-aader Plot Measured Depth (400 usftlin) +mu�wau. o,a,�v, o,ae, otu. m.oeva m-+yw-,e.. m,s,vs-ot-0s,mm�o,arv, . m�maw, o,-0wv, +2 a:-o,-as+e .mor -w. o,age,aevo +m -,x, m.n, o+-ttw �osl4o oaaww -o,m otaa�, �raHv, .. o,m. m-e,mvz o,m.o�,msvx otaq m410 -vx-pi-N.A h,e1-0,Rvr x,m,mm,owwvx .. .2f, was m.s ,.ma.erasaer ormPw va �•m-n.wae. o,�w o+mr�. oxa,a, o,a,80 voan.m�n www .: was wau.wawv, m418,ot.o=e vn .. .oue�. o,auvi .. e,a4ows W-1-,.asa.oya. mat v+ •o,ae, etas, waevrtew From Colour To MD 42 600 600 1100 1100 2000 2000 7000 7000 8500 8500 11300 11300 12100 12100 14255 SURVEY PROGRAM North America -ALASKA -BP Oeytlr From Deptir To SurveylPlan Too( 42.06 400 00 O]-371A�PO9 4PLAN 01-37) 4205 40000 0137 WPW (PLAN (11-37) GLIND VO -GC -SS 4DO 00 70D DO 01-37 WP09 (PLAN 0147) BLIND BLINDG_S5 400 00 70000 01-37 MOO (PLAN 01-37) aYDQBLIND 700 00 1000 00 01-37 WP09 (PLAN 01.37) 700.00 1000.00 01-37"M (PIAN. 17.1 GY043C-BB 1000.00 1400.00 0137 WPO9 (PLAN D1-371 BLIND 100(j.00 14.0.00 01.37 WP09 4P1AN 01.37) GYD43C.SS I 1400 DO 3856 00 01.37 YWOD (PLAN 01-37) MWti 14.0.00 3855.00 01-37 WPO9 (PLAN 01 37) 4FR+MS-WDCA 3856.00 385500 10076.00 01-37 WPo9 (PLAN 01.371 10078 00 0137 VePO9 (PLAN 01-37) MWD ATM.+IFR+MS-UK)CA 1 D076.00 142664 77 tl337 WPo9 (PLAN 0137) 77 01-5? WP09 (PLAN 01-371 MWD MWD+IFR+h%-WOGA 10078.00 14264 Obp . 0149, al -0e, ol-0e vt ffl a, 014e, -W Depth To SuivayfiPlan 42.05 400 DO 01-V MOO 4205 400.00 01-37 IAP09 40000790-0 09-37 "US400.00 oem, 41.aS1. 6F25A vi 700.00 01-37 MOB 700,au 7000.00 01-37 WP09 700.00 1000.60 01-37 MOB 100000 1400.00 01-37 VMS ,GOO 13C1400.00 01-37 MOB 1400do 3655.00 01_37 MOO 1400.00 3855,00 0147 WPOB 3855.00 10079.00 01.97 MOO 3855.00 10078 -DO 01-37 M09 10076.90 14254.77 01}97 WPO9 10078.00 1425477 9137 MOB - � WELL DETAILS ANTI -COLLISION SEMMOS COMPANY DETA3LS North -menca-ALASKA-OP Pfgect P8O $Ra: 01 Ground Level 40-00 BtterpakthonMatIlod MO, interval 25.00 CohWonMethod NBnpnuriCurvaturs W49, O"T Norhtmg 5840436.200 Depth Range From 4205 To 385500 Error System ISCWSA WelborePLAN 01.97 Esstmg 688733 740 RedUft Luded By Centre D1stanre 162121 Scan Method Trey c-lbr ler North Dasigm41 97WPO9 I La9sude 70' 14' 28.810 N I Rabmnce 01-37 WP08 Error Surface EllpBcalComc Langliudo 148" 2S 41 662 W Warping Method Rulee Based SURVEYPROGRAM BECTIONDETAIIS Taal 01-12. al -IN, n1.12AI 0149, al -0e, ol-0e vt ffl a, 014e, -W seaDID Ina Ala TVD +Ni -s +EPW Dietl TFVsaer 37) BLIND oem, 41.aS1. 6F25A vi al -K w.00 1. a1.0 l v2 W., o2-185, _tmA 5' 03, 0141, 01.0 vz 42.05 0-00 0.96 42.05 0.00 000 0-0 0.00 000 31) GYD_GCSS2 Dill, ai42. 8D•R vt From Colour TO MD 900.110 0.OD 0.00 500.00 0.00 900 0 DO O. 00000 37) BUND - 100000 500 90.00 99937 0.00 2180 1.00 90.00 2106 37) GYD43C-99 4 1.10000 it 00 90.00 1286.31 0.00 63.54 200 D.00 51.37 37) BUND 42 600 5 1600-0 2000. 90,00 158510 0.00 143.62 3.00 000 13973 371 GYD-GCSS 8 2277 B6 34 81 12226 21IS-103,85 425.30 3.90 60 74 38393 37) BLIND 600 1100 7 6578.03 34 61 12226 7372.50 -2093.33 3450.38 0 00 0.00 2819 72 37) OYD-OC 8 9546.74 3S.00 'e no 818715 -206842 3956.113 3.00 -11124 3286.40 371 14WD 1 100 2000 9 10077 77 3600 7a 00 9822 15 -106224 4242.75 000 0.00 35M9.83 37) MND+IFR+Ms•WOCA 0.00 0,00 W2 23 37) MWO 2000 3855 17 10945 6 90,00 70.00 9015 80 -1711.33 4932.45 6.50 0.00 432154 373 1OWD+1FR+M&WOCA 92 1129561 9700 70.00 699444 -1591.02 5260.53 2-0 900 4669.34 371 MWO 13 11573.61 9700 7a.00 ONG 41 •1513.54 547508 OAO 0.00 4806.76 37) WWD+IFR+M5*X)CA id 1212561 8700 54.86 8693.29 423880 800147 2.50 -90.00 5476.35 '15 12456.61 97.00 5488 8852.71 1WB.68 6271.81 0.00 040 578670 g DepthRange:�eQPJ 16 f2908.61 8700 4129 8797 e7 -750.98 8803.40 3.90 -90.00 616403 I-� J��d� 17 i315e.81 07 gD 4129 976740 -66,54 678714 0.09 0.00 679044 18 13333 61 90.00 41 7.9 8756.72 -433.37 8882.33 4 00 160 40 8535.65 19 13833.61 7000 4129 8843 t1 -6527 7205.61 4.00 180.00 694319 20 14254,77 MOO 4129 099715 232-0 7488.76 000 0.00 727240 180 Azimuth from North ['] ve Centre to Centre Separation [u9ft] AanAlthfrPrk"hr)w Centre M Centre Separation [30 u61dh) GI4/. 01.0w al -0 Vr 01-12. al -IN, n1.12AI 0149, al -0e, ol-0e vt ffl a, 014e, -W 0144 01aa. 01.08 w of 2L vi -x al -74 v1 014e, bl aak 01.885 VI ". co -A G3 -a VI al4 0141. 01-01 v2 014L 0481. 0l4 w 8145, 01-05A� al.= vl oem, 41.aS1. 6F25A vi al -K w.00 1. a1.0 l v2 W., o2-185, _tmA 5' 03, 0141, 01.0 vz mac Gla6, 01-36lYPle v0 01-00 81.06. ol-0 v11 arae V0 D}?2, 04x5, G>-av, w Olae GI.]6. G1.]6 w 01 n 0145, p145v3 D141A. 01-01A. 8141Avr Dill, ai42. 8D•R vt .m, dtm, W1 v2 01-12 01-12. 01-12 v3 0141-, 01416, m.Dte w mom, m-, al -0W Vt 0147 Yuaee WELL DETAILS ANT1X;OLL ISION 6ETTlNus -~� coAAPANY DF.TA9_S Narth nlrrenca-ALAS%A-OP Pmpd PSU . _._. - .._ ... _. _.. hds -- � CaloulBOPnWhGel MinlmumcurvatUm by Gro Norhoef 6940 rphRan RangeMabod aaad.feTo 14 R0 ..,_ SNe- 01 Norhdng 5940438.200 Depth Range FiOm 3865.00 TO 74264 77 Ener System ISGWSA Wer: 01-37 EeeOng 688733.740 Rasub Ljn%bd 7y Centre Distance 162127 I Sven Method Trav Cyhrmfor North Webaw: PLAN 04-37 Loftde 70° 74' 28610 N Referenew 01.37 WOO Error surface nle Rulo5 Based basion 01.37 WPOS Longitude 148'23'41662W I +Naming Method RuIBs Based SECYIDAIOETAILS suRVEYPR➢GRRM - ... . .. . __ . . ._... Be. MC Inc 4a TVD +W.9 Er -W ➢kp TF -ft 1/600 Depth From DeptF To SurveylPW .__ _. Tn01 1 BLIND 42.06 400:00 0137 WN (PLAN 01+37) GYD-GC.A6 42 05 400 00 400.00 01-37 WPOS (PLAN 01-37) 70000 0117 WPO9 (PLAN 0117) BUND I 400110 700.00 0137 JJPOB (PLAN 01.37) OYD.GCSS 00.00 1000.00 0, -r VJPOB (PLAN 0137) BUND . 700.00 1000.00 Oi�i7 WP04 LPL AN 01371 GYD43CSS 1000.00 1400.00 07-37 WOO (PLM101.37) BLIND 1d60.00 14pO.O11 01.37 WOO (PLAN Oi-371 GYD-GC-SS 1408.00 3aSLOO 01-17 WPO9 (PLAN 01-37) 01.37 WP04 (PLAN 01 17.1 MWD MND+IFR+MSWOGA 1400.00 3655.00 3655.00 1007800 9137 WPO9 (PLAN 01-37) LUDIFR+MSNJGCA 3856.00 10076.90 01-37 WPO9 (PLAN 01-37) I 10076.00 14264 77 0137 WPW (PLAN 0137) WOO 01-371 MWD MWD+FR+4'&wDCA ^0075.00 14254.77 01.37 (PLAN 650 From Colour Tc MD Depth lenge: 3855.00)' o 14254,77 3855 7000 8500 11900 12100 14255 1 4205 SO000 080 000 (00 4205 0-00 000 0.00 500 00 0 On 0.00 0,00 0.00 11.00 0.00 0110 000 3 1000.00 5.00 9000 904.37 0.00 2150 '1 DO 90 OO 2106 000 61,37 4 1300 p0 71.00 90.00 1295.31 0 00 53,54 158510 0.00 14362 2-00 300 0,00 73873 5'1500.00 6 227785 20.00 34,61 9000 t22.26 27aS 98 -103.85 425.30 300 6074 383.98 289172 7 85i7603 34.61 26 750 201833 3450.38 122 372 70.00 8187 l5 -20SB 42 3856.03 0W 3.00 0.00 -11124 3286.40 a 9546.74 9 loon 77 35.00 35 7000 SS2215 -1962.24 4242.28 0.00 000 3589.83 1010099 45 -OC 35.00 7000 8639.81 -1957.99 4253 94 0 O6 000 3602.23 11 -0945.5190 00 70.00 801580 -1711.03 4932A5 650 0.00 432154 1 12 1128551 97 00 70.00 8994 44 -158162 5269.53 2.00 0.00 4869.34 13 11525.61 9700 70.00 B966 41 -1513.54 547505 0.00 0.00 4696.76 5476.35 'i 4 12125 d9 9700 5408 8893.29 -1238.80 5001.47 8B 685271 -1048.66 627181 250 0.00 -90.00 0.00 57aS.00 .70 - 5 12458.61 0661 9700 54 6 4129 8797.87 -nUo 0767 03 14 3 110 as 0.90 1e .3158.61 97 00 4129 8787 40 5564.54 275872 -433.37 6802 38 0.00 4 00 639044 18000 853566 18 73333.61 19 i3B33,ti'i 80.00 70.00 4129 41.29 884311 5527 7205.61 w00 150.00 694319 20 +4254.77 L 70 00 4'i 24 8987 15 232.09 7465.75 5.00 0.00 7272.40 W M -0N V) C1-12, of -IM M4 MVe MB, Ma1Bw mae. M44 Mab V1 M,M-MW Mae 01 e---441111 6PB1. m�nBl V] OSIa, m.tae.-im Ve osa m� vn maa m-z�a, m -Me w M -Mw oJ-A.W..%GJ lAVT 11, 01-8 3 a4-01�. 81019. P1a1B V6 180 Azimuth from North nw Ctetoeto Centra Seperafion[30 uaelin) w1 , M -aa Bine w alae P1-�, B1 -0e V] Mae, a1aM, Ol-M V1 e9dti C4e5"V1 4104, olaM. Mdx w mss, py1M, m-ar� v1. m.m,otm m-mvl maemm m -es alPtew m -n. o>•arti m.svlw Awe, alm,Maevs m.a-w.a, mazes otm,Mm.Ma4 v4 M-oe. Ptaell.maat v1. swr wvoe by North America - ALASKA - BP PBU 01 01-37 PLAN 01-37 01-37 WP09 Plus 500ft MD AOGCC Offset Well Report 23 April, 2019 &mWrbT N T.. ... _. Nac.:s.ce'.I.. WELLBORE 6ETr11L5 PLAN 01-31NPCRM4rIt1K Projee— PRU i „*" :� ceadlrete[NpRe1e<�: wan01a7,rararlarur � by Wei: 07 i' ���:1, 01-37 I vSxfi. SJRA�m' S10HOAirz®a7.Isuortivknxerz7zl Wee; PLA se 4 sUm dpjhRaW.e P6nKaaoµams] Walmoix PLAN 01-07 om.:7vtaoll�i cured Dopdt Rele<erm: Plan KB PlTx@i B7.15raK(Pkn K9 P272) peslpn: 01,4;WP08 Plus WOR MD Mdetao[i�olsi Tie an Ma 4245 CdcUelon Mstl od: MNmrmCw-wN AOGC`C SDider Plot BP 0 by Anticollision Report Company: North America - ALASKA - BP Local Co-orcilm" Reference. PF019Ct PBU TVD Reference Relamnce Site: 01 MD Reference: Site Error 0.0ousft North Reference. Reference Well! 01-37 survey Calculation Method: Well Error 0.00usft Output errors are at Reference Wellbore PLAN 01-37 Datstrase. Reference Design: 01-37 WP09 Plus 500ft MD Offset TVD Reference RefaYenee 01-37 WP09 Plus 500ft MD BLIND Filter type: NO GLOBAL FILTER: Using user defined seledien & FiRering criteria Intarpolatlon Method: MD Interval25.00usft Error Model: Depth Range: Unlimited Scan Method: Results Limited by, Ma>amum center -center distance of 200.00usft Error Surface: Well 01-37 Plan KB P272 a 87.15usft (Plan KB P272) Plan KB P272 @ 87.15usft (Plan KB P272) True Minimum Curvature 1.00 sigma EDM RSK- Alaska PROD -ANCP1 Offset Datum ISCWSA Tray. Cylinder North Elliptical Conic Survey Tool Program Date 4!23!2019 From (usm To {usfo Survey (Wellbore) Tool Name Desenphon 42.05 400.00 01-37 WP09 Plus 5008 MD (PLAN 01-37) BLIND Blind drilling 42.05 400.00 01-37 WP09 Plus 500ft MD (PLAN 01-37) GYD-GC-SS Gyrodata gyro single shots 400.00 700.00 01-37 WP09 Plus 50011 MD (PLAN 01-37) BLIND Blind drilling 400.00 700.00 01-37 WP09 Plus 500ft MD (PLAN 01-37) GYD-GC-SS Gyrodata gyro single shots 700.00 1,000.00 01-37 WP09 Plus 500ft MD (PLAN 01-37) BLIND Blind drilling 100.00 1,000.00 01-37 WP09 Plus 500ft MD (PLAN 01-37) GYD-GC-SS Gyrodata gyro single shots 1,000.00 1,400.00 01-37 WP09 Plus 500ft MD (PLAN 01-37) BLIND Blind drilling 1,000.00 1,400.00 0137 WP09 Plus 500ft MD (PLAN 01-37) GYD-GC-SS Gyroda% gyro single shots 1,400.00 3,855.00 a1-37 WP09 Plus 500ft MD (PLAN 01-37) MVO MWD - Standard 1,400.00 3,655.00 01-37 WP09 Plus 50011 MD (PLAN 01-37) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 3,855.00 10,078.00 01-37 WP09 Plus 5008 MD (PLAN 01-37) MWD MWD - Standard 3,855.00 10,078.00 01-37 WPo9 Plus 500ft MD (PLAN 01-37) MWD+IFR+MS-WOCA MVO + IFR + Multi Station W10 Crustal 10,078.00 14,754.77 01-37 WP09 Plus 500ft MD (PLAN 01-37) MWD MWD -Standard 10,078.00 14,754.77 01-37 WP09 Plus 500ft MD (PLAN 0137) MWD+IFR+MS-VOCA MWD + IFR + Mufti Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Depth Depth Distance Sita Name Offset Well - Wellbore - Design (usft) (usfo (Deft) 01 01-03 - 01-03-01-03 985.55 975.00 183.65 01-03 - 011-03A- 01-03A 995.63 975.00 183.B7 01-04 - 01-04 - 01-04 986.68 975.00 65.98 01 -04 -01 -04A -01-04A 986.68 975.00 65.98 01-04 - 01-04B - 01-04B 995.88 1,000.00 68.44 01-05 - 01-05 - 01-05 988.07 975.00 59.19 01-05 - 01-05B - 01-05B 994.24 975.00 59.23 01-05-01-05PB1-01-05PB1 989.07 975.00 59.19 01-36 - 01-38 - 01-36 398.42 400.00 151.96 01-36 - 01-36 - 01-36 WP16 401.14 400.00 149.85 01-37 - PLAN 01-37 - 01-37 WP09 14,254.77 14,254.77 0.00 03 4/23/2019 3:27:52AM Page 2 of 2 COMPASS 5000. i Build 81D I Gr •,v I tea. :!4 st' sag m .ti' 1335' ■.V DATE:7116Ml3 WELL INJECTOR • _ _- T i _ ,- C SCALE -.I"=7--' ?E U - DSI WELL SLOT WICONDUCTOR ® MAP DATE 2412 Notes Diverter Plan for Well 01-37 1 - This diverter vent line configuration is identical in length to previous designs. 2 - There is no change in distances to ignition sources. All dimensions remain the same. PARKER 272 DIVERTER RISER SPOOL. SPACER 21-1/4" 2M PSI R-73 FLANGED STD RING GROOVE 11'-3 15/16" OVERALL LENGTH DIVERTER VENT SPOOL 21-1/4" 2M PSI R-73 FLANGED STD RING GROOVES W/ 16" CLASS 3001 ANSI B16.5 OUTLET S-10" OVERALL LENGTH DRIL DIVERTER ANNULAR iP 21-1/4* X 2000 PSI UD x FLANGE -73 RING GROOVE SER SPOOL, SPACER -1/4" 2M PSI -73 FLANGED 'D RING GROOVE -10" OVERALL LENGTH 6° 300 PSI CWP DO% FULL PORT OPENING YDRAULICALLY ACTUATED NIFE GATE VALVE LITH CLASS 3000 ANSI 816.5 FLANGE 6" DIVERTER VENT UNE LOW= BELL NIPPLE CA WELL 3r DIA. PIPE SEAL WELBEB TO TIE BOTTOM OF TIE FLOWSOX TOP of ROTARY TABLE _- 30- a' ' - - - IMI ouL TRIPLE INFLATABLE RUMSEAL WELL BELL NIPPLE, BOTTOM OF ROTARY BEAM - - 16' ON UPPER, 16' T L 3" CASING FILL OUTLET (OW OO F 2) -., .._. ..Y.. 13 5/W' SM BOTTOM LITE FLANGE 16' KEMPER SEAL -O -GRIP (1 EA) 3' DK STD. 011RET - -.. - (1 IA) r DAL STD. wn.EF t A tow I I � I I 3 MBCH LOCK DOWN FLANGE f ! E ANNULAR BDP. - ' 13-0/8' SM 9iAFFER I]R i9^I I 13-5/a' 5M STUDDED TOP 5M FLANGED BDTTOII � � n NAM TYPE SON 13 5/W' 5M NIH 6012 DDUBLE BDP 13 5/B' 5M SIIIDED TOP 13 5/6' 5M RAILER BOTTOM C,+ CELLAR DECK PLATFC W/ 3-1/2' MANUAL LOOM W/ 11' BOOSTER a � DRILLING CROSS: 13 S/B' 5M STUDDED TOP - 13 5/a' 5m FANGED BOTTOM ' W (2) 3 1/5' SM SIDE OUTLETS ,1[ I ' KILL LINE 2-1/16' 5M FLEX HOSE 1 3 I I i 3 8 1 2-1/1W' SE1 X 3-1/6' 5M DSA llr- 5M RANGED MANUAL CATE W1LVE 3-1/8. 5M FANGED HYDRAULIC GATE VALVE IE 61 I PoW TYPE TKK+: Ile I Its Ili 13 5/W' 5M NOY 5012 SINGLE BOP 13 5/6' SY STUDDED TOP - - I ! I �' .•. I _ Y. i I l 13 5/B' 5Y FANGED BOTTOM MEMO II 11 lI , E 7 11 iLk • "'I TOPPLE UP: r !3 � SPACER SPOOL 13 5/B' 5M FAKE TOP 13 5/6' SM HANGED BOTTOM CHOW UNE; J -1r6' 5M RANGED MANUAL GAZE VALVE SPACER SPOOL 3-1/6 5M FANGED HYDRAULIC GTE VALVE r� 13 5/W' 5M FLANGE TOP 3-1/6' 5M FLEX HOSE 13 5/6' 5M RANGED BOTTOM DOUBLE SRIDDEO ADAPTER 13 5/6' sM FANGED TOP II' SM FLANGED BOFTOM CELLAR AND WELL HEAD CONFIGURATION WN SPOOL ASSEMBLY ARE FOR REFERENCE ONLY NE ARE 11' 5111 FLANGED LOP DEPENDENT ON OPERRIOR'S N FLANGED BOTTOM REpU6IEMENTS CONS WAD ASSEMBLY 11' SM FLANGED TOP 60`2 BOP STACK (DRAFT 8.3.17 L.C.) Rixse, Melvin G (CED) From: Nocas, Noel <Noel.Nocas@bp.com> Sent: Monday, May 20, 2019 11:27 AM To: Rixse, Melvin G (CED) Subject: RE: PTD 219-073, PBU 01-37 3 wells requiring Minor 1/200 flags to pass collision risk Hi Mel, Thank you for getting back to me on this PTD. Please see the following response to your email: Well 01-01A/B: 01-01A is the parent wellbore for 01-01B and 01-01C. 01-01A was drilled in 1984 and sidetracked in 1991 to 01-01B. In 2007 01-01B was sidetracked to 01-01C. 01-01B was P&A'd and a 9-5/8" x 7" liner top in the parent bore isolates the A and B wellbores. (there are no integrity concerns in 01-01C that would indicate communication with the old wellbores) 01-37 DOES NOT fail to the current (operable and online) 01-01C Well 01-05 this well has been P&A'd and sidetracked for 01-05B. 01-05B is currently not -operable and shut in with a downhole plug (tested to 2452psi 2017). Well 01-12 is the parent wellbore for 01-012A. In 2002 it was sidetracked to 01-012A. The well plan fails only to 01-12 and not to 01-12A which is producing. Prior to the sidetrack the parent well was abandoned and integrity testing does not indicated communication between the two wellbores. Thank you for your time and attention, please do not hesitate to contact me with any additional questions. Best, Noel Noel Nocas Drilling Engineer — BP Alaska noel.nocas@bp.com o. 907-564-5027 c. 907-229-9532 1 v " Mhava we IT war- i W*'Wa * vF.HNKr,Pwr W Ift"t From: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Sent: Monday, May 20, 2019 11:13 AM To: Nocas, Noel <Noel.Nocas@bp.com> Subject: PTD 219-073, PBU 01-37 3 wells requiring Minor 1/200 flags to pass collision risk TRANSMITTAL LETTER CHECKLIST WELL NAME: EV -37 PTD: `ye? - `X73 ✓ Development _ Service Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: Z�L�Ze POOL:ae, Ci Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to fail compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Cmpany has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Cgmaany Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, sus erasion or abandonment of this well. Revised 2/2015