Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-081Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 06/09/2025 Mr. Jack Lau Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 06/09/2025. Dear Mr. Lau, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 06/09/2025. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525) Date: 2025.06.09 14:30:46 - 08'00' Oliver Sternicki (4525) Hilcorp North Slope LLC.Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-offReport of Sundry Operations (10-404)06/09/2025Well NamePTD #API #Initial top of cement (ft)Vol. of cement pumped (gal)Final top of cement (ft)Cement top off date Corrosion inhibitor (gal)Corrosion inhibitor/ sealant dateF-10C21308650029204100365/29/25F-29B2111475002921627026.25/29/25F-33A20816350029226400145/29/25F-3619519650029226310035/29/25F-39190141500292210100175/29/25F-44A2051615002922130012.55/29/25F-47B21007950029222320215/29/25L-2512231065002923772001.8813/31/24117/29/24L-2532230485002923758004.1201.13/31/24127/29/24L-2542230305002923752003.8321.23/31/24137/29/24L-2922230255002923751003.3301.33/31/24147/29/24N-282141275002923524006.8504.711/19/242212/28/24N-302141245002923523003.5330.311/17/243.512/28/24PAVE1-122309450029237670019.910/27/24PWDW3-221908150029236340014.810/27/24S-40120607850029233130015.31130.511/15/24412/28/24PWDW3-221908150029236340014.810/27/24 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, September 12, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC PWDW3-2 PRUDHOE BAY UNIT PWDW3-2 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/12/2023 PWDW3-2 50-029-23634-00-00 219-081-0 W SPT 4328 2190810 1500 1533 1531 1531 1531 15 63 63 66 4YRTST P Guy Cook 7/22/2023 4 year MITIA. Testing completed with a Little Red Services pump truck and calibrated gauges. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT PWDW3-2 Inspection Date: Tubing OA Packer Depth 395 2262 2204 2209IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC230723142040 BBL Pumped:1.6 BBL Returned:1.8 Tuesday, September 12, 2023 Page 1 of 1           2190(81 CASED 3z11C HOLE Well Log Transmittal To: AOGCC Natural Resources Technician 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE: Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : BP Exploration (Alaska), Inc. SIM Data Manager Attn: Merion Kendall MB 7-5 900 Benson Blvd. Anchorage, AK 99508 GANCPDC_ Aa USAANC.hou.xwh.BP.COm and READ Cased Hole, Inc. Attn: Diane Williams 4141 B Street Suite 308 Anchorage, AK 99503 Diane.williams@readcasedhole.com 1) Injection Profile 2) f; Signed : :'v Print Name: 16 -Nov -19 1 CD RECEIVED MAR 0 2 2020 AOGCC 50-029-23634-00 �r. Date � b s ir' n t / READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL: READ-ANCHORAGE(C'DREADCASEDHOLECOM WEBSITE: WWW.READCASEDHOLE.COM hnps/'mdmsedhole-my.shuepointcowpmonW/diane_williems_mdcesedhole_w M/ mwMDe IftopMP_Tm=it.doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED rtt$ U / ZUZU 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown❑ s� Suspend El Perforate 0 Other Stimulate ❑ Alter Casing 11v Champ rrygrarit ❑ v Plug for Redrill ❑ Perforate Nev, Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Re -Pert Disposal 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ❑ Exploratory ❑ 5. Permit to Drill Number. 219-081 3. Address: P.O. Box 198812 Anchorage, AK 99519-6612 Stratigrephic ❑ Service 0 6. API Number: 50-029-23834-00-00 7 Property Designation (Lease Number): ADL 028312 & 028309 & Well Name and Number: PBU PWDW3-2 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE BAY UNDEFINED WATER DISPOSAL WELL 11. Present Well Condition Summary: Total Depth: measured 6317 feet Plugs measured None feet true vertical 6231 feet Junk measured None feet Effective Depth: measured 6218 feet Packer measured 4381 feet true vertical 6134 feet Packer true vertical 4324 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor 80 20" X 34" 47-127 47-127 Surface 3218 13-3/8" 46-3264 46-3226 5020 2260 Intermediate Production 6263 9-5/8" 45-6308 45-6222 6870 4760 Liner Perforation Depth: Measured depth: 5360-5977 feet True vertical depth: 5289-5896 feel Tubing (size, grace, measured and true vertical depth) 7" 26# x 5-1/7'17# L-80 42-4506 42-4447 Packers and SSSV (type, measured and 5-1/2" HES TNT Packer 4381 4324 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 11239 50 1500 Subsequent to operation: 15946 13 1400 14. Attachments:(requwr per 20 PAC 25.070.25.071, 825.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL 0 Copies of Lags and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ Sundry Number or N/A if C.O. Exempt: 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 319461 & 319-530 Authorized Name: Lastufka, Joseph N Contact Name: Thompson, Ryan Authorized Title: S Sped RsContact Email: RYAN.THOMPSON@bp.com Authorized Signature: Date: 2, /"!,a Contact Phone: +1 907 564 4535 Form 10404 Revised 04/2017 RBDMS t-' FEB 10 2020 Submit Original Only T/I/O= 500/0/0 Temp= SI LRS unit 42 Assist E -Line (Freeze protect TBG & FL) Road to 1/8/2020 location, Spot equipment. ***Job continued on 01/09/2020*** ***WELL SHUT IN ARRIVAL*** MIRU HES ELINE UNIT 4863 COLD WEATHER STAND BY 1/9/2020 ***CONT ON 1/11/2020 WSR ***Job continued from 01/08/2020*** LRS unit 42 Assist E -Line (Freeze protect TBG & FL) Pumped 120 bbls 60/40 down FL & TBG for FP from Mod bldg. FS3 operator notified 1/9/2020 of well status upon departure. FWHP= 1200/0/0. FL= 650 psi ***CONTINUE FROM 1/09/2020 WSR*** COLD WEATHER STANDBY RIG UP HES ELINE 1/10/2020 ***CONTINUE ON 1/11/2020 WSR*** ***CONTINUE FROM 1/10/2020 WSR***(hes eline - perforate) PERFORATE 5,945'- 5,977' WITH 4"x 32', 4 SPF, 90 DEGREE PHASING, HSC. PERFORATE 5,875' - 5,907' WITH 4"x 32', 4 SPF, 90 DEGREE PHASING, HSC. ALL PERFORATIONS CORRELATED TO BP PDCL AUG -7-2019. 1/11/2020 ***CONTIUNE ON 1/12/2020 WSR*** ***CONTINUE FROM 1/11/2020 WSR***(hes eline - perforate) PERFORATED 5,626 - 5,658', W/ 4"x 32', 4SPF, 90 DEGREE PHASING, HSC. PERFORATED 5,548 - 5,580', W/ 4"x 32', 4SPF, 90 DEGREE PHASING, HSC. CORRELATED TO BP PDCL AUG -7-2019. 1/12/2020 ***JOB COMPLETE, TURN WELL OVER TO DSO*** P W D W 3 —2 SAFETY NOTES: MAX DLS: 13.1' @ 50' f 127' 1 1 ki III -i 1-1 1934' H7" DB6 NIP, ID = 6.00" 215.5 #, AS3, J ID = 13-3/8" CSG, 68#, L-80 BTC, D = 12.415" 3264' Minimum ID = 4.452'@ 4489' 5-1/2" XN NIPPLE 7' TBG, 26#, L-80 VT HC, .0383 bpf, ID = 6.276" 4235' TOP OF 5-1/2' 4237' 51/2" TBG, 17#, L-80 VT HC, 4SO6' .0232 bpf, D = 4.892" PERFORATION SUMMARY REF LOG: ON / / ANGLE AT TOP PERF: 10" @ 5360' Note: Refer to Production DB for NSWCel Derf data SIZE SPF INTERVAL OPn1Sqz I DATE 3-1/8" 6 5360-5423 O 07/15/19 3-1/8" 6 5446-5478 O 07/15/19 3-118" 6 5548-5580 O 07/15/19 4" 6 5548-5580 O 01/12/20 3-118" 6 5626-5658 O 07/14/19 4" 6 5626-5658 O 01112/20 3-1/8" 6 5730-5793 O 07/14/19 4' 6 5875-5907 O 01/11/20 4" 6 5945-5977 O 01111/20 u—L 6216' L-80 VT, D=8.681• 630W 4350' 5-1/2" HES X NIP, ID = 4.562- 438V 9-5/8" X 5-1/2" HES PKR, D =4.791• 4417' I-1Si/2-HES X NP, D= j 4506'Iy 512" WLEG, U= 4$02' ELMD TT 07/13/19 DATE REV BY COMMENTS DATE REV BY COMMENTS 07/07/19 P-272 INRIAL COMPLETDN 01/1420 BTN/JMD ADPERFS/REPERFS 07/10/19 KP/JMD TREE INSTALLED 07/15/19 JMD DRLG HO CORRECTIONS 07/16/19 BG/JMD FINAL ODE APPROVAL 07/23/19 BTN/JMD NMAL PERFS 08/08/19 JNUJ ID ADDED OKB, BF, 8 COND PRUDHOE BAY UNIT WELL: PWDW3-2 PERMIT No: 219-081 API No: 50-029-23634-00 T1 ON, R1 4E. 4912' FSL 8 487; BP Exploration (Alaska) THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Ryan Thompson Interventions Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc,alasko.gov Re: Prudhoe Bay Field, Prudhoe Oil Undefined Water Disposal Pool, PBU PWDW3-2 Permit to Drill Number: 219-081 Sundry Number: 319-530 Dear Mr. Thompson: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, JPrice Chair DATED this&k day of November, 2019. IBDM&� NOV 2 5 2019 RECEIVED NOV 2 0 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of R qu((pp��[��[ (� �yy(p�'roon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ XV G V Su6pend ❑ Perforate p Other Stimulate ❑ Pull Tubing ❑ Change Approved Program Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: ' Exploratory ❑ Development ❑ 5. Permit to Drill Number: 219-081 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service Q 6. API Number: 50-029-23634-00-00 7, If perforating: What Regulation or Conservation Order governs well spacing in this pool? e. Well Name and Number: Will planned perforations require a spacing exception? Yes ❑ No 21 PBU PWDW3-2 9. Property Designation (Vaasa Number): x 10. Field/Pools: - ADL 028312 & 028309 PRUDHOE BAY, PRUDHOE OIL UNDEFINED WATER DISPOSAL WELL 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: I MPSP (psi): 1 Plugs (MD): Junk (MD): 6317 6231 6218 6134 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" x 34" 47-127 47-127 Surface 3218 13-3/8" 46-3264 46-3226 5020 2260 Intermediate Production 6263 9-5/8" 45-6308 45-6222 6870 4760 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 5360-5793 5289 - 5715 7" 2fi# x 5-1 /2" 17# L-80 1 42-4506 Packers and SSSV Type: 5-1/2" HES TNT Packer Packers and SSSV MD (ft) and TVD (ft): 4381 /4324 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary D Wellbore Schematic RI 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑ Service Zr 14. Estimated Date for Commencing Operations: December 15, 2019 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL RI Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Thompson, Ryan be deviated from without pnorwritten approval. Contact Email: RYAN.THOMPSON@bp.com Authorized Name: Thompson, Ryan Contact Phone: +1 907 564 4535 Authorized Title: Intervent Authorized Signature: Date: 11/101/ti COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: O Plug Integnty ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: 3BDMS' NOV 2 5 2019 Post Initial Injection MIT Req'd? Yes ❑ No ❑ / — Spacing Exception Required? Yes ❑ No 6V Subsequent Form Required: `Q G! APPROVED HE A Approved by: COMMISSIONER (1 COMMISSION COMMISSION Date. WE I' ?ii -1 0 R -I. G I N A L �GQ uN / �40 Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. _ Affachm'e0t� Pup icate 10-403 Sundry Application for Well PBU PWDW3-2 PTD#219-081 Expected Start Date: December 15, 2019 Current condition of well: Disposal Well, Operable, Injecting: Water Injection Rate: 35000 Bbls/Da Injection Pressure: 1400 psi Shut-in Wellhead Pressure: 200 psi Reservoirpressure: 2521 psi Well objective(s): PWDW3-2 is a newly drilled Disposal well currently online at 1800 psi wellhead pressure and —35,000 bpd of produced water injection. Injection expectations are for higher rates On 11/5/19 fullbore pumped a SBG treatment and on 11/16/19 SL drifted to 6,163, (ELM) & performed a ]PROF. The IPROF results indicate most of the injection is going into the top and bottom sets of perforations. In order to increase injection we will re -pert the middle two sets of perfs and adperfs in two new sections below. Proposed program: Adperf & Reperf per sheet using 4" Geodynamics guns. BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 COMPANY: BP EXPLORATION (ALASKA) INC. Well: PWDW3-2 PDCL LOG UWI: 500292363400 Elevation:85.79 Total Depth: 6317 Elevation Datum KB Primary Depth COMroI Log Components; Ali available gamma ray logs have been considered and appropnately incorporated into the composite PDC.GR PDCL tog, Note that FINAL, Depth - corrected data was used to create this GR PDCL and it may differ from FIELD prints. PDCL Date: 07-Au9,2019 PDCL-1 Start: 396 PDCL_,1 Stop: 6292.5 PDCL-1 : PWDW3 2 MWD.GRIAM BHGE 3-0W-2019 PDCL-2 Start: PDCL_2 Stop: PDCL 2: PDCL 3 Start: PDCL 3 Stop: PDCL 3: PDCL_4 Start: PDCL_4 Stop: PDCL 4: PDC1_5 Start: PDCL_5 Stop, PDCL 5: 5500 5550 5600 5350 5375 m 5425 5600 5650 5700 5450 5475 5500 5525 5850 5900 5950 5700 5725 5750 5775 5900 5950 wOPENDING PERFORATING PROCEDURE global wells organization Well: PWDW3-2 API #: ###p##pk#ppllp Primary Ph: —(907)564-4535 _ H2S Level: Date: 11/19/2019 Prod Engineer: Ryan Thompson Secondary Ph: (90_)301-1240 N/Appm CC or AFE: Reference Log PDLL LOG: DATE: 8/7/19 Company: BP _ Depths (from N 5,548' S,! 5626' S,t 5,8]5' 5" 5,945' 5,< Tie -In Log See Procedure Add 0_ _ feet to the tie-in log to be on depth with The reference log om-to) Feet SPF Orientation Phasing Zone PERF TYPE _ 5,580' —. --_ 32' ----- __ 4 Random 90° UG1 REPERF __--5,977----- General Comments: 4 ____.__ _ Random _—__.____ 90° __._._._ UG3 _.._..__.—_. REPERF 5,90]' _ 32 4 4 Random 90' UGl__ AOD PFRF —._._.___—.._..___._.__ 4 Random 90' ___ W52 ADDPERF Requested Gun Size 4'_ Charge Goo -Razor — Min Wellbore ID: _ 4,45" _ Max Swell in Liquid: 4_.16" Max Swell in Gas: NA is Drawdown Necessary/Desired/Unnecessary During Perforating Preferred Amount of Drawdown/Suggestions to Achieve Drawdown Cast Drift: - 6163_ ft MD on 11/16/2019 Est Res. Pressure @ _ 5,300' TVDss _ MD is _ 2521 —Psi Perforation Summary summary Dist Well: -PWDW3-2 Prod Engc _—.__----- Town : Dale: API In ..__.._....___...-.. 50-1129-23634-00 PeTD �--------��----------�--� - Arch Prod Engr P.D. Center General Comments: ___.—.____.___ Depths Gun Dix Orientation SPF Phasing Zone Atlperf/Reperf Balance Referenced to BH6 C/B/U —._._.___—.._..___._.__ D / B / U __._.._.._.._. __._. _-_.__._.____ .._.____.._._ _—._._--__.._—. --------- -------- ____----- __. _._.__—._.__._.._.—__._. O/8/U-..__._.._.._....._—.___._.._-__ ._.._._.__—_..__ __.._.____ .___—.._._.__._._ .._._._.._— _._ ..—._._._._._ 0 / B / U _...._._..__._....._.._.___._—._._ TREE= CNV 6" WELLHEAD = ACTUATOR= CMJSH 3000 OKB_ ELEV = 85.79' BE. ELEV = -41.29' KOP= 0 MaxA le= 13" 2410' Datum MD = NA Datum TVD = 07/15/19 PW D W 3 SAFETY NOTES: MAX DLS: 13.1" @ 50' 20"X34 COND, 127' 215.5#, A-53, 8" CSG, 68#, L-80 BTC, D = 12.415" 3264' ------------- Minimum ID = 4.45" @ 4489' 5-1/2" XN NIPPLE —i 26#, L-80 VT HC, .0383 bpf, ID = 6.276" 1 42; 5-1/2" TBG, 17#, L-80 VT HC, 4506' .0232 bpf, D = 4.892' PERFORATION SUMMARY REF LOG: _ ON _/_/_ ANGLE AT TOP PERF: 10" @ 5360' Note: Refer to Production DB for historical Derf data SIZE 1 SPF 1 INTERVAL O ntSz DATE 3-1/8" 6 5360-5423 O 07/15/19 3-1 /8" 6 5446 - 5478 O 07/15/19 3-1/8" fi 5548-5580 O 07/15/19 3-1 /8" 6 5626-5658 O 07/14/19 3-1/8" 6 5730-5793 O 07/14/19 1 6308' 1 1934' H7" DB6 NIP, E) =6.00" 4235' 1--� 7" X 5-1/2" XO, ID = 4.892" 4350' 5-1/2" HES X NIP, ID = 4.56 4381'95/8" X 5-1 /2" HES PKR, IO = 4.791" 4417' 5-1/2" HES X NP, ID = 4.562" 4489' S-1 /2" HES XN NP. ID = 4.455" 1 47u6 I- 1 !-VL" WLtYi, U = 4592'ELMDTT 07/13/191 DATE REV BY I COMMENTS DATE REV BY COMMEMS 07107/19 P-272 NOTAL COMPLETION 07/10/19 KP/JMD TREE INSTALLED 07/15/19 JMD DRLG HO CORRECTIONS 07/16/19 BG/JMD FINAL ODE APPROVAL 07Y23/19 BTN/JMD NOWL PERFS 08/08/19 JNL/JMD ADDED OKB, BE, & COND PRUDHOE BAY UNIT WELL: PWDW3-2 PERMIT No: 219-081 API No: 50-029-29634-00 F10N, R14E, 4912' FSL & 4873 BP Exploration (Alaska) TREE= CM/6" WELLHEAD= ACTUATOR= CNVSH 3000 OKB. ELEV= 85.79' BF. ELEV = -41.29' KOP= 0 Max Angle = 13° 2410' Datum MD = NA Datum TVD = O Ls -3/6" CSG, 68#, L-80 BTC, D = 12.415" 3264' J Minimum ID = 4.45" ae 4489' 5-1/2" XN NIPPLE 7" TBG, 26#, L-80 VT HC, .0383 bpf, ID = 6.276" 4235' TOP OF 5-1/2" TBG —F4237' 1 4312' 5-1/2 TBG,17#,L89-80 VT HC, 4506' .0232 bpf, IO = 4.2" PERFORATION SUMMARY REF LOG: _ ON _/_/_ ANGLE ATTOP PERF: 10° @ 5360' Note: Refer to ProdwVon DB for historical perf data SIZE SPF MTERVAL NS q z DATE 3-1/8" 6 5360-5423 O 07/15/19 3-1/8" 6 5446-5478 O 07/15/19 3-118" 6 5548-5580 O 07/15/19 3-1/8" 6 5626-5658 O 07/14/19 3-1/8" 6 5730-5793 O 07/14/19 4" 4 5875-5907 propos d 4" 4 5945-5977 propos d 1 6218' { 1 9-5/8" CSG. 47#, L-80 VT. D= 8.681" 1 1934' I—17" D136 NIP, ID = 6.00" 4235' 1—� 7" X 5-1/2" XO, ID = 5-1/2" HES X NIP, b = 4.562" '8" X 5-1/2° HES PKR, IO = 4.791" 5-1/2" HES X NP, ID = 4.562" 15-1/2- HES XN NP, ID=4.455" 1 4506'-15-1/2"VVLEG,ID=4$92" 4502' ELMD I -r 07/13/19 DATE REV BY COMMENTS DATE REV BY COMMENTS 07/07/19 P-272 NMAL COMPLETION 07/10/19 KP/JMD TREE INSTALLED 07/15/19 JMD DRLG HO CORRECTIONS 07/16/19 BG/JMD FINAL ODE APPROVAL 07Y23/19 BTWJMD INIRAL PERFS 08/08/19 JNL/JMD ADDED OKB, BF, & COND PRUDHOE BAY UNIT WELL: PWDW3-2 PERMrr N0: 219-081 API N0: 50-029-29634-00 HON, R14E, 4912' FSL & 4873 BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 10/14/2019 Permit to Drift 2190810 Well Name/No. PRUDHOE BAY UNIT PWDW3-2 Operator BP Exploration (Alaska) Inc. API No. 50-029-23634-00-00 MD 6317 TVD 6231 Completion Date 7/15/2019 Completion Status WDSP2 Current Status WDSP2 UIC No REQUIRED INFORMATION Mud Log No I// Samples No 1/ Directional Survey Yes DATA INFORMATION List of Logs Obtained: MWD/GR, MWD/GR/RES, CmtEv (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH _ _ Received Comments _ 0. 0 ED C 31243 Digital Data 3767 3548 9/24/2019 Electronic Data Set, Filename: PWDW3- 2_C1_20190706_RBT_HAL_FREE PIPE.Ias ED C 31243 Digital Data 6219 12 9/24/2019 Electronic Data Set, Filename: PWDW3- 2_C1_20190706_RBT_HAL_MAI N.las ED C 31243 Digital Data 6220 5976 9/24/2019 Electronic Data Set, Filename: PWDW3- 2_C1_20190706_RBT_HAL_REPEAT.las ED C 31243 Digital Data 9114/2019 Electronic File: PWDW3- 2_Ct_20190706_RBT_HAL.pdf ED C 31243 Digital Data 9/24/2019 Electronic File: PWDW3- 2_C1_20190706_RBT_HAL_FREE PIPE.dlis ED C 31243 Digital Data 9/24/2019 Electronic File: PWDW3- 2_C1_20190706_RBT_HAL_img.tiff ED C 31243 Digital Data 9/24/2019 Electronic File: PWDW3- 2_C 1 _20190706_RBT_HAL_MAI N.dlis ED C 31243 Digital Data 9/24/2019 Electronic File: PWDW3- 2_C1_20190706_RBT_HAL_REPEAT.dlis Log 31243 Log Header Scans 0 0 2190810 PRUDHOE BAY UNIT PWDW3-2 LOG HEADERS ED C 31288 Digital Data 112 6317 10/4/2019 Electronic Data Set, Filename: PWDW3- 2_BHGE_OTK_Mem_Composite _FE Drilling Data.las ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_2MD_Memory Drilling Log.cgm AOGCC Page 1 of 3 Monday, October 14, 20191 DATA SUBMITTAL COMPLIANCE REPORT 10/14/2019 Permit to Drill 2190810 Well Name/No. PRUDHOE BAY UNIT PWDW3-2 Operator BP Exploration (Alaska) Inc. API No. 50.029.23634.00.00 MD 6317 TVD 6231 Completion Date 7/15/2019 Completion Status WDSP2 Current Status WDSP2 UIC No ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2 BHGE_OTK_2TVDSS_Memory Drilling Log.cgm ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_5MD_Memory Drilling Log.cgm ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_STVDSS_Memory Drilling Log.cgm ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3-2_BHGE_OTK- VSS_RLT-MEM_Composite Drilling Dynamics Log.cgm ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_Mem _Composite—FE Drilling Depth Data.dls ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_2MD_Memory Drilling Log.pdf ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_2TVDSS_Memory Drilling Log.pdf ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_5MD_Memory Drilling Log.pdf ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3- 2_BHGE_OTK_5TVDSS_Memory Drilling Log.pdf ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3-2_BHGE_Final Survey Repon.csv ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3-2_BHGE_Final Survey Report.pdf ED C 31288 Digital Data 10/4/2019 Electronic File: PWDW3-2_BHGE_Final Survey Report.txt Log 31288 Log Header Scans 0 0 2190810 PRUDHOE BAY UNIT PWDW3-2 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED AOGCC Page 2 of 3 Monday, October 14, 2019 DATA SUBMITTAL COMPLIANCE REPORT 10114/2019 Permit to Drill 2190810 Well Name/No. PRUDHOE BAY UNIT PWDW3-2 Operator BP Exploration (Alaska) Inc. API No. 50-029-23634-00-00 MD 6317 TVD 6231 Completion Date 7/15/2019 Completion Status WDSP2 Current Status WDSP2 UIC No Completion Report Directional / Inclination Data Mud Logs, Image Files, Digital Data Y /(NCore Chips Y2 NA Test Information Y /� Mechanical Integrity Test Information Y/ NA Composite Logs, Image, Data Files U Core Photographs Y ((NAS� Geologic Markers/Tops YO Daily Operations Summary D Cuttings Samples Y / NA Laboratory Analyses Y / N8) COMPLIANCE HISTORY Completion Date: 7/15/2019 Release Date: 5/24/2019 Description Comments: Compliance Reviewed By: Date Comments Date: 0J '4 I I I AOGC(' Page 3 of 3 Monday, October 14, 2019 THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Ryan Thompson Interventions Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. o o g c c. a l a s k o. g o v Re: Prudhoe Bay Field, Prudhoe Oil Undefined Water Disposal Well Pool, PBU PWDW3-2 Permit to Drill Number: 219-081 Sundry Number: 319-461 Dear Mr. Thompson: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, " k:? Price Chair DATED this l 1 day of October, 2019. 3BDMShE'4'0CT 14 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ( `LICATION FOR SUNDRY APPROVALS! 20 AAC 25.280 OCT 0 8 2019 DTS ab l/ f j41' 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ /t q lyr�4 4hu;down ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ hange A Prov d gram ❑ Plug for Reddll ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other Re-Perf Disposal Well 0 2, Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development ❑ 5. Permit to Drill Number 219-081 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stretigrephic ❑ Service IZ 6. API Number: 50-029-23634-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes Cl No 0 PBU PWDW3-2 ' 9. Property Designation (Lease Number): 10. Field/Pools: ' 1 ADL 028312 & 028309 PRUDHOE BAY. PRUDHOE OIL UNDEFINED WATER DISPOSAL WELL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft)'. Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 6317 6231 6218 6134 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" x 34" 47-127 47-127 Surface 3218 13-3/8" 46-3264 46-3226 5020 2260 Intermediate Production 6263 9-5/8" 45-6308 45-6222 6870 4760 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 5360- 5793 5289-5715 T. 26# x 5-1/2" 17# L-80 42-4381 Packers and SSSV Type: 5-1/2" HES TNT Packer Packers and SSSV MD (ft) and TVD (ft): 4381 14324 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑ Service 0 14. Estimated Date for Commencing Operations: October 20, 2019 15. Well Status after proposed work: G�IA55 TT Oil ❑ WINJ ❑ WDSPL 0' Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Thompson, Ryan be deviated from without prior written approval. Contact Email: RYARTHOMPSONOtiocom Authorized Name: Thompson, Ryan Contact Phone: +1907 564 4535 Authorized Title: Interventions Engineer Authorized Signature: Date: )0/7/1 1 / 1 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 31R-yU► Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ❑/ 3BDMSt�� OCT 14 2019 Spacing Exception Required? Yes ❑ No Ef Subsequent Form Required: p+401 APPROVED BYTHE Approved by. COMMISSIONER COMMISSION Date. ub to 2-0t 1 Form 10-403 Revised 04/2017 I6lq,te, ORIGINAL &-elj-loncin9 Submit Form and Approved application is valid for 12 months from the date of approval.Attachments in Duplicate 10-403 Sundi pplication for Well PBU PWDW3-2 PTDE )-081 Expected Start Date: October 20, 2019 Current condition of well: Water Disposal Well, Operable, Injecting: Water Injection Rate: -35,000 Bbls/Da Injection Pressure: 1400 psi Shut-in Wellhead Pressure: 200 psi Reservoirpressure: 2521 psi Well objective(s): PWDW3-2 is a newly drilled Disposal well currently online at -1800 psi wellhead pressure and -35,000 bpd of produced water injection. Injection expectations are for higher rates. The intent of this program is to perform a SBG, Drift to TD to verify all perfs are open, & re-perf (5360'- 5423', 5446'- 5478', 5548'- 5580', 5626'- 5658', 5730' - 5793') with Stim guns to help penetrate or clean out the perfs. Proposed program: 1. Pump SBG in tubing and flowline. 2. Drift to TD w/ -32'x 3 1/8" pert guns. 3. Re-perf per perf sheet using 2" stim guns. BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 WOPENDING PERFORATING PROCEDURE global wells organization Orientation Well: PWDW3-2 AN a: #######CKNPM Primary Ph. (907) H25 Level: Date: 10/7/2019 Prod Engineer: .......................... _._._._. Ryan Thompson Secondary Ph: (90]I 301-1240 N/A ppm CC or AFE: Reference Log MWD LOG: _ DATE: Company: BHGE Depths (from -b 5,_360'5; ._.._5,_446_.._. ._._..5; ._...5,_548• ------51 5,_626'._ ...-5,1 ._...5,730 _.... ...._..5; Tie -In Log See Procedure Add 0 feet to the He -In log to be on depth with the reference log am -to) Feet SPF Orientation Phasing Zone PERMPE 5,423'63' 6 Random 60° UGl REPERF .ERRE_PERF ..._._......._....._ ..—_—_._ 6 Rantlom 60° REPERF 5,580_ --32'_— 32' 6_ Random ° _-UGl UGI REPERF 32' _ _ _ 6_ _ _._____._ RandomUG -60 --.PREF REPERF 5,793' _ _ 63' _— 6 Random 60' UG1 REPERF Requested Gun Size 2" Charge Stimtube Min Wellbore ID: Is Drawdown Necessary/Desired/Unnecessary During Perforating Preferred Amount of Drawdown/Suggestions to Achieve Drawdown Last Drift: 6191 ft MDon 7/12/2019 Est Res. Pressure@ 4.45" Man Swell in Uquid: Update Max Swell in Gas: Update 5,300'TVDss MDis 2521 psi um_mary Oist own: -- nth Prod Engr P.D. Center Zone Adperf/Reperf TREE= CMV6" WELLHEAD = ACTUATOR= CMJ SH 3000 OKB. ELEV = 85.79' BF. ELEV = -4129' KOP = 0 Max Angle = 13-0241W Datum MD = NA Datum TVD = 07/15/19 w3WDW3-2 215.5#, A-53, D= 13-3/8" CSG, 68#, L-80 BTC, D = 12.415" 3264' Minimum ID = 4.45" @ 4489' 5-1/2" XN NIPPLE 7" TBG, 26#, L-80 VT HC, .0383 bpi, ID = 6.276" 4235' TOP OF 5-1/2" TBG 4237' EST TOC kf 4312' — 5-1/2" TBG, 17#, L-80 VT HC, 4505' .0232 bpf, D = 4.892' PERFORATION SUMMARY RE F LOG'. _ ON ANGLE AT TOP PERF: 10" @ 5360' Note: Refer to Production DB for historical Derf data SIZE I SPF I INTERVAL ONS z I DATE 3-1/8"6 07/10/19 5360-5423 O 07/15/19 3-1 /8" 6 5446-5478 O 07/15/19 3-1/8" 6 5548-5580 O 07/15/19 3-1/8" 6 5626-5658 O 07/14/19 3-1/8" 6 5730-5793 O 07/14/19 9-518" CSG, 47#, L-80 VT, D = 8.681" SAFETY ""TES: MAX DLS:13.1 ° @ 50' 1934' 1-17" 13136 NIP, ID = 6.00" 4235' 1-17" X 5-1/2" XO, ID = 4.892" 4350' —15-1/2" HES X NIP, ID = 4.5E 4387 9-5/8" X 5-1/2" HES PKR, ID = 4.791" 441T 5-1/2"HES X NP, D=4.562" { 4506' 1--15-1/2"WLEG, D=4.892" 4$02' ELMD TT 07/13/19 DATE REV BY COMMENTS DATE REV BY COMMENTS 07/07/19 P-272 NTML COMPLETION 07/10/19 KP/JMD TREE INSTALLED 07/15/19 JMD DRLGHOCORRECTIONS 07/16/19 BG/JMD F14AL ODE APPROVAL 07/23/19 BTN/JMD IN PERFS 08/08/19 JNUJMD ADDED OKB, BF, & COND PRUDHOE BAY UNIT WELL: PWDW3-2 PERMIT No: 219-081 API No: 50-029-29634-00 TION, RUE, 4912' FSL & 4873 BP Exploration (Alaska) BA ER PRINT DISTRIBUTION LIST 21 9081 31288 Ise sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 ) E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR -RES LOG DATE July 3, 2019 TODAYS DATE October 2, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY ADDRESS (FEDEX WILL NOT DELNER TO P.O. BOX) PERSON ATTENTION V .......................................................... FIELD UGHES a GE company CD/DVD COMPANY BP Exploration Alaska Inc. WELL NAME PWDW3-2 LOGS FIELD Prudhoe Bay Unit REPORT COUNTY PRUDHOEBAY CGM, Final Surveys) BHI DISTRICT Alaska # OF PRINTS AUTHORIZED BY Paul Canizares EMAIL Paul.CanizaresC&bhoe.com 21 9081 31288 Ise sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 ) E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR -RES LOG DATE July 3, 2019 TODAYS DATE October 2, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY ADDRESS (FEDEX WILL NOT DELNER TO P.O. BOX) PERSON ATTENTION V .......................................................... FIELD FINAL CD/DVD FINAL 0 0 PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES V N] ..................................... t :BP Nottn Slope. 0 0 0 0 0 EOA, PBOC, PRB-20 (Office 109) iD&C Wells Project Aides Attn: Benda Glasssnaker & Peggy O'Neil :900 E. Benson Blvd. i Anchorage, Alaska 99508 i_.._'-___...._._._...._....._._._._._...._.___._...._.._.................... 2 :ConoeoPhillips Alaska Inc. 0 0 1 0 Q ;Attu: Ricky Elgarico ;ATO 3-344 i :700 G Street Anchorage,AK 99510._...._____........._......._............_......._: 007 3 ,F.XXonMobil, Alaska .............................................. :Ala Q 0 i Q :Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street. Suite 505 C ;Anchorage, AK 99503 State of Alaska - AOGCC Attn: Natural Resources Technician 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 DNR - Division of Oil & Gas *.. Attn: Rersource Evaluation Section 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 BP Exploration(Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchomee. Alaska 99508 TOTALS FOR THIS PAGE: 0 0 4 0 0 WELL LOG TRANSMITTAL # To: Alaska Oil and Gas Conservation Comm. Atm.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Radial Cement Bond Log: PWDW3-2 Run Date: 7/6/2019 21108! 3 124 3 September 12, 2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 Data in LAS format, Digital Log Image files 50-029-29634-00 RECEDE® SEP 2 4 2019 aoGCC 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com and GANCPDC@USAANC.hou. Date: OzyZY Signed: STATE OF ALASKA `LASKA OIL AND GAS CONSERVATION COMMISB' 'N WELL jMPLETION OR RECOMPLETION REPO` AND LOG jIV nrt, n G ^n;n la. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class. 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL a • No. of Completions: One -� Development ❑ Exploratgr4y ❑ , Service 2 Strabgraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 7/15/2019 219-081 ' 3. Address: 7. Date Spudded: 75' API Number: P.O. Box 196612 Anchorage, AK 99519-6612 6/27/2019 50-029-23534-00-00 4a. Location of Well (Govemmental Section): 8. Date TD Reached: 16, Well Name and Number: 7/3/2019 PBU PWOW3-2 Surface: 4912' FSL, 4873' FEL, Sec. 03, T10N, R14E, UM Top Of Productive Interval: 184' FSL, 140' FEL, Sec. 33, T71 N. R14E, UM 9 Ref Elevations KB 85.79 GL 39.00 BF 41.29 17. Field/Pool(s): PRUDHOE BAY, PRUDHOE OIL UNDEFINED WATER DISPOSAL WELL 10. Plug Back Depth(MDfTVD): 18. Property Designation: Total Depth: 3D4' FSL, 287' FEL, Sec. 33, T1 IN, R14E, UM < 6218'16134' ADL 028312 5 028309 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number Surface: x- 676721 • y- 5945289 Zone - ASP 4 • 6317'16231' 77-044 TPI: x- 676161 y- 5945827 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth: x- 676031 y- 5945945 Zone - ASP 4 None 18681/1858, 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re -dr illLateal Top Window Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MDfM N/A 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD / OR, MWD / GR f RES, Cement Evaluation 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" x 34" 215.5# A-53 47' 127' 47' 127' 42' 18 yds Concrete 13-3/8" 68# L-80 46' 3264' 46' 3226' 18" 1802 sx LiteCrete, 315 sx Class'G' 9-518" 47# L-80 45' 6308' 45' 6222' 12-1/4" 992 sx Class'G' 24. Open to production or injection? Yes El • No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number, Date Perfd): GRADE DEPTH SET (MD) PACKER SET (MD/TV 7" 28# L-80 4506' 4381'14324' 3-1/8" Gun Diameter, 6 spf 7/14/19 -7/15/19 x 5-1/2" 17# L-80 5360'- 5423' 5289'- 5351' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 5446'- 5478' 5373'- 5405' Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed Yes ❑ No 0 5548'- 5580' 5474' - 5505' 5626'- 5658' 5551'- 5582' COMPLETION 5730'- 5793' 5653' - 5715' T information V RIhIED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Injection: July 27, 2019 Method M Operation (Flowing, gas lift, etc.): Produced Water Dale of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Sive Gas -Oil Ratio: Test Period y Flow Tubing 1400 Casing Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr)' Press 40 24 Hour Rate Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only rtiAIr''4'" RBDMS�M'AUG 1 k 1019kllY/ol 28. CORE DATA Conventional Consist Yes ❑ No 0 ' i Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top 42' 42' Well Tested? Yes ❑ No 0 Permafrost - Base 1910' 1900' If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 5308' 5237' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4 4534' 4475' Ugnu 4A 4548' 4488' Ugnu 3 4803' 4740' Ugnu 1 5308' 5237' West Bak 2 5920' 5840' West Salk 1 6181' ' 6097' Formation at total depth: West Bak 1 6181' 6097' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Summary of Post -Rig Work, As -Built Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certifv that the foreaoino is true and correct to the best of my knowledae. Authorized Name: Lastufka, Joseph N Contact Name: Gorham, Bradley M Authorized Title: 61INIXpecialist Contact Email: Bmdley.Gorham@bp.com Authorized Signature: Date: �j I' Contact Phone: 907-5644649 INSTRUCTIONS General: This form is designed for submitting a complete and corect well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of pernafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30, Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 512017 Submit ORIGINAL Only TREE= I CiIW6" WELLHEAD= ACTUATOR= C1W SH 3000 OKB. ELEV = 85.79' BF. ELEV= -4129' KOP= 0 Max Angle= Daturn MD= 13"@2410' NA Datun JMD DRLG HO CORRECTIONS ND= 2"X� —1_127 215.5#, A-53, ID= 3-3/8" CSG, 68#, L-80 BTC, D = 12.415" 3264' Minimum ID = 4.45" @ 4489' 5-1/2" XN NIPPLE 17- TBG, 26#, L-80 VT HC, .0383 bpf, ID = 6276 - TOP OF 5-1/2' TBG EST TOC 5-0/2" TBG, 17#, L-80 VTHC, 4$06' .0232 bpf, ID = 4.892' PBT'D 6218' 9-5/8" CSG, 47#, L-80 VT, D = 8.881' 6308' 1934' 1--�7" DB6 NIP, ID =6.00" 4235' 1-17" X 5-1/2" XO, ID = 4.892- 4360' 15-1/2" HES X NIP, ID = 4.562" 4381' 9-5/8" X 5-1/2" HES PKR, D = 4.791' 4417' I—J5-1/2" HES X NP, D = 4.562 4489' 115-1/2" HES XN NP, ID = 4-455- 1 4606' 115-1/2' WLEG, ID=4 892" 4502' ELMD TT 07/13119 DATE REV BY COMMENTS PERFORATION SUMMARY 07/07/19 P-272 INRIAL COMPLETION REF LOG: ON 11 KP/JMD TREE INSTALLED ANGLE AT TOP PERF: 10" @ 5360' JMD DRLG HO CORRECTIONS Note: Refer to Production DS for tistorical erfdata 07/16/19 SIZE SPF INTERVAL O NS z DATE 31/8" 6 5360-5423 O 07/15/19 3-1/8" 6 5446-5478 O 07/15/19 31/8" 6 5548-5580 O 07/15/19 31/8" 6 5626-5658 O 07/14/19 31/8" 6 5730-5793 O 07/14/19 PBT'D 6218' 9-5/8" CSG, 47#, L-80 VT, D = 8.881' 6308' 1934' 1--�7" DB6 NIP, ID =6.00" 4235' 1-17" X 5-1/2" XO, ID = 4.892- 4360' 15-1/2" HES X NIP, ID = 4.562" 4381' 9-5/8" X 5-1/2" HES PKR, D = 4.791' 4417' I—J5-1/2" HES X NP, D = 4.562 4489' 115-1/2" HES XN NP, ID = 4-455- 1 4606' 115-1/2' WLEG, ID=4 892" 4502' ELMD TT 07/13119 DATE REV BY COMMENTS DATE REV BY COMMENTS 07/07/19 P-272 INRIAL COMPLETION 07/10/19 KP/JMD TREE INSTALLED 07/15/19 JMD DRLG HO CORRECTIONS 07/16/19 BG/JMD FINAL ODE APPROVAL 07/23/19 BTN/JMD INRIAL PERFS 08/08/19 JNUJMD ADDED OKB, BF, & COND PRUDHOE BAY UNIT WELL: PWDW3-2 PERMIT No: 219-081 API No: 50-029-29634-00 T10N, R14E, 4912' FSL & 4873 BP Exploration (Alaska) Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: PWDW3-2 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (Pp) (psi) (BHP) (psi) (Ppg) 07/02/19 LOT 3,264.00 3,225.42 9.60 980.00 2,588.31 15.45 Page 1 of 1 North America - ALASKA - BP Operation Summary Report Page 1 of 15 1 Common Well Name: PWDW3-2 - 11:30 11:30 - 14:30 1430 AFE No Event Type. URL -ONSHORE (DON) WAIT ON RIG MATS TO BE PLACED ON ROAD Start Date: 6/23/2019 End Date. 7/3/2019 X3-019GW-C: (3,884,833.00 ) Project: PBUSAT 3.00 Site: PWDW-- DIVERTER ANNULAR _ AREA IN FRONT OF TARMAC CAMP Rig Name/No.: PARKER 272 MOB P Spud DateRme: 6/27/2019 12:01:OOAM WAIT ON RIG MATS TO BE PLACED ON Rig Release: 7f7/2019 Rig Contractor: PARKER DRILLING CO. -COMPLETE WORK ORDER INSPECTIONS OXBOW ROAD - PERFORM MAINTENANCE ON AUGER, TOP BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) DRIVE, SHAKERS AND OTHER EQUIPMENT P -0.46 _ Date From - To Him Task Code NPT Total Depth Phase Description of Operations SPOT AND LEVEL DRILL MOD OVER WELL (hr) - MARRY MUD MOD AND UTILITY MOD TO 6/23/2019 09:00 - 11:00 2.00 MOB P -0.46 PRE RIG DOWN ON 1-5-27 AND PREPARE TO MOVE WOODSCREW P -0.46 PRE RIG UP INTERCONNECTS BETWEEN TO PWDW3-2 MODULES P -0.46 PRE RAISE MAST -BRIDLE UP BLOCKS - PERFORM PRE -RAISE DERRICK INSPECTION -PERFORM DERRICK INSPECTION - 430 KLBS MAST OFF THE RACK '- TIEBACK LINES IN MAST - SKID RIG FLOOR FROM WELL CENTER TO MAST OVER POSITION - LOWER MAST TO HEADACHE RACK ----370 KLBS MAST ON THE RACK 1100 - 1330 2.50 MOB P -0.46 PRE SPLIT MODULES AND MOVE OFF WELL - STAGE MODULES AT PAD ENTRANCE AND PREPARE TO MOVE TO FIRST STAGING AREA 1330 - 1730 4.00 MOB P -0.46 PRE MOVE ALL 3 MODULES TO STAGING AREA AT EAST DOCK - PARK MODULES SO RIG MATS CAN BE _ 'MOVED 1730 - 0000 6.50 MOB P -0.46 PRE WAIT FOR RIG MATS TO BE PLACED ON ROAD - CHANGE OUT UPPER RAMS TO 9-5/8" FIXED ,BORE RAMS -CHANGE OUT LOWER RAMS TO 4-1/2" X 7" VARIABLE BORE RAMS -COMPLETE WORK ORDER INSPECTIONS PREP SHAKER BASE TO BE WELDED 6124/2019 0000 - 11:30 11:30 - 14:30 1430 - 0000 6/25/2019 00:00 - 1330 13.50 MOB 11.50 MOB P -0.46� PRE WAIT ON RIG MATS TO BE PLACED ON ROAD 21:30 MOB P y_ -0.46 PRE -COMPLETE WORK ORDER INSPECTIONS MOVE RIG MODULES TO SECOND STAGING 3.00 DIVERTER ANNULAR _ AREA IN FRONT OF TARMAC CAMP 9.50 MOB P -0.46 PRE WAIT ON RIG MATS TO BE PLACED ON 1 '.i -COMPLETE WORK ORDER INSPECTIONS OXBOW ROAD 6/25/2019 00:00 - 1330 13.50 MOB 13:30 - 21:30 8.00 MOB 21:30 - 0000 2.50 MOB 6/26/2019 0000 - 02:30 2.50 0230 - 03:00 0.50 RIGU RIGU Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" -COMPLETE WORK ORDER INSPECTIONS - PAINT FLANGE COVERS -ASSIST WIRING MOTOR ON SHAKERS - PERFORM HYD CHAMBER TEST ON DIVERTER ANNULAR P -0.46 PRE WAIT ON RIG MATS TO BE PLACED ON OXBOW ROAD -COMPLETE WORK ORDER INSPECTIONS - PERFORM MAINTENANCE ON AUGER, TOP DRIVE, SHAKERS AND OTHER EQUIPMENT P -0.46 PRE MOVEALL3MODULES FROMTARMAC CAMP TO PWDW3-2 P -0.46 PRE SPOT AND LEVEL DRILL MOD OVER WELL - MARRY MUD MOD AND UTILITY MOD TO DRILL MOD - HOLD PRESPUD MEETING WITH RUSSELL WOODSCREW P -0.46 PRE RIG UP INTERCONNECTS BETWEEN MODULES P -0.46 PRE RAISE MAST - PERFORM PRE -RAISE DERRICK INSPECTION - 430 KLBS MAST OFF THE RACK Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. PWDW3-2 Event Type. DRL- ONSHORE (DON) Start Date: 6/23/2019 End Date: 7/3/2019 Project: PBUSA7 Site: PWDW Rig Name/No.. PARKER 272 Spud Date/Time: 6/27/2019 12:01:OOAM Page 2 of 15 AFE No X3-019GW-C. (3,884,833.00 ) Rig Release: 7/'7/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: 500292363400 Active datum. ACTUAL KB - P272 Q85.79usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations _hr) - _ (usft) 03:00 - 03:30 0 .50 RIGU P -0.46 PRE SKID RIG FLOOR TO DRILLING POSITION - RAISE PIPE CAT - SKID HAUNCH - INSTALL ROOF TOP WALKWAYS AND _1 HANDRAILS 03.30 - 0630 3.00 RIGU P -0.46 PRE GENERAL RIG UP OPERATIONS - INSTALL MAN RIDERS AND SPOOL UP LINES - PERFORM DERRICK INSPECTION - RIG UP MUD LINES I'- RIG UP STEAM TO WELLHOUSE AND INSTALL CONDUCTOR VALVES ON 'CONDUCTOR - RIG UP PITS - SPOT CUTTINGS BOX - NIPPLE UP DIVERTER —ACCEPT RIG AT 06:30"' WBS:RIGU 0630 - 1430 8.00 RIGU P -046 PRE NIPPLE UP THE DIVERTER SYSTEM - NIPPLE UP 21-1/4" RISERS, 21-1/4" DIVERTER ANNULAR AND KNIFE VALVE WITH 16" DIVERTER EXTENSION OUT THE BACK OF THE RIG - HOOK UP ACCUMULATOR LINES AND _ ENERGIZE ACCUMULATOR - INSTALL FLOW RISER, FLOW LINE, AND TURNBUCKLES - PERFORM DIVERTER FUNCTION TEST SIMOPS: LOAD BHA INTO PIPE SHED 14:30 - 15:30 1.00 RIGU P -0.46 PRE HOLD RIG EVAC/DIVERTER/H2S DRILLAND PRESPUD MEETING WITH LYLE BUCKLERS CREW 15:30 - 17:30 2.00 RIGU P -0.46 PRE PERFORM DIVERTER FUNCTION TEST - KNIFE VALVE OPENED IN 20 SEC AND THE ANNULAR CLOSED IN 43 SEC - CHECK PVT AND FLOW ALARMS - TEST FIRE AND GAS ALARMS - TEST WITNESSED BYAOGCC REP GUY COOK 1730 - 2030 3.00 RIGU P 126.54 PRE BUILD STANDS OF 5" HWDP AND DP - HOIST BHA PIECES TO THE RIG FLOOR - FILL LINES AND PRESSURE TEST TO 3500 PSI (VISUAL LEAK TIGHT) - RUN IN THE HOLE WITH A STAND OF PIPE AND TAG BOTTOM AT 127' MD_ 20:30 - 22:00 1.50 RIGU N 126.54 PRE TROUBLESHOOT TOPORIVE - ELECTRICIAN REWIRE SERVICE LOOP TO TOP DRIVE BLOWER MOTOR SIMOPS: - BUILD STANDS OF 5" DP IN OFFLINE STAND _ BUILDING EQUIPMENT 22:00 - 00:00 2.00 DRILL P 128.54 SURF MAKE UP 16" SURFACE HOLE BHATO 96' MD - PICK UP 16" MILLTOOTH TRICONE, 1.5° AKO MUD MOTOR, MWD/LWD - MAKE UP STAND OF HWDP TO BHA WBS:SURF Printed 8/812019 11:57:37AM "All depths reported in Drillers Depths" Common Well Name. PWDW3-2 Event Type-DRL- ONSHORE(DON) Project PBUSAT Rig Name/No.: PARKER 272 North America - ALASKA - BP Operation Summary Report Page 3 of 15 Start Date'. 6/23/2019 End Date'. 7/3/2019 X3-019GW-C: (3,884,833.00 ) Site: PWDW Active datum: ACTUAL KS - P272 @85.79usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth (hr) (usft) 6/27/2019 00:00 - 0400 4.00 DRILL P 473.00 04:00 - 05:30 1.50 BPU01: 500292363400 Phase Description of Operations SURF CLEAN OUT TO THE BOTTOM OF THE CONDUCTOR AND DRILL 16" SURFACE HOLE FROM THE BOTTOM OF THE CONDUCTOR AT 127' MD TO 473' MD (346' IN 4 HOURS = 87 FT/HR WITH CONNECTIONS AND SURVEYS) - INSTANTANEOUS ROP = 100 - 120 FT/HR - 400 GPM, 750 PSI ON BOTTOM, 550 PSI OFF BOTTOM - 40 RPM, 3 - 4 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM - 20 KLBS WOB PU = 60 KLBS, SO = 60 KLBS, ROT = 57 KLBS - SURVEY FIRST 1000' MD PER SURVEY PROGRAM - MUD WEIGHT = 8.6 PPG IN/OUT FLOW PADDLE TIED BACK FOR FIRST 1000' MD PER PTD DRILL P 1 473.00 SURF POOH TO THE TOP OF THE DIRECTIONAL 05:30 - 14:00 8.50 DRILL 14:00 - 14:30 14:30 - 15:30 15:30 - 17:00 P -_964.00 I 1 0.50 DRILL P 1.00 DRILL N 1.50 DRILL N 1700 - 2300 6.00 DRILL N 964.00 964.00 964.00 964.00 TOOLS AT 96' MD TO PICK UP THE DRILL COLLARS AND JARS TO 403' MD. - PH TO BOTTOM SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 473' MD TO 964' MD (491' IN 8.5 HOURS = 58 FT/HR WITH CONNECTIONS AND SURVEYS) - INSTANTANEOUS ROP = 100 - 190 FT/HR - 600 GPM, 1450 PSI ON BOTTOM, 1350 PSI OFFBOTTOM - 50 RPM, 4 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM - 25 KLBS WOB - PU = 97 KLBS, SO = 94 KLBS, ROT = 97 KLBS - SURVEY FIRST 1 000'MD PER SURVEY PROGRAM - MUD WEIGHT = 8.8 PPG IN/OUT - FLOW PADDLE TIED BACK FOR FIRST 1000' MD PER PTD Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" - OBSERVE CLEAN SURVEYS WITH MWD AT 581' MD, DRILL TO 964' MD AND RUN GYRO BACK TO SURFACE, RELEASE GYRO AND SLICKLINE - BRAKE RELEASED ON TOP DRIVE WHILE SLIDING AND LOST HYDRAULIC PRESSURE ON TOP DRIVE WHILE DRILLING, DECISION MADE TO PULL OUT OF THE HOLE AND CHANGE OUT SERVICE LOOP BETWEEN THE LER HOUSE AND THE TOP DRIVE. SURF SERVICE RIG SURF RESTORE HYDRAULIC PRESSURE TO TOP DRIVE SURF PULL OUT OF THE HOLE FROM BOTTOM AT 964' MD TO THE TOP OF THE DIRECTIONAL BHAAT96' MD - MONITOR WELL FOR 10 MIN (STATIC) - NO ISSUES PULLING OUT OF THE HOLE SURF CHANGE OUT SERVICE LOOP FROM THE LER HOUSE TO THE TOP DRIVE - MONITOR WELL WITH CONTINUOUS HOLE FILL (STATIC) Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" Common Well Name: PWDW3-2 Event Type. DRL- ONSHORE (DON) North America - ALASKA - BP Operation Summary Report AEE No Start Date: 6/23/2019 End Date: 7/3/2019 X3-019GW-C: (3,884 833 00 ) Site: PWDW Page 4 of 15 Rig Name/No.: PARKER 272 Spud Date/Time: 6/27/2019 12:01:OOAM Rig Release: 7/712019 Rig Contractor: PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79us8 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 23:00 - 00:00 1.00 DRILL N 964.00 SURF RUN IN THE HOLE FROM 96' MD TO BOTTOM AT 964' MD NO ISSUES RUNNING IN THE HOLE _ 6/28/2019 00:00 - 06:00 6.00 DRILL P 1,434.00 SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 964' MD TO 1434' MD (470' IN 6 HOURS = 78 FPH WITH CONNECTIONS AND SURVEYS) - INSTANTANEOUS ROP = 60-180 FPH SLIDING AND ROTATING -550 GPM, 1350.1400 PSI ON BOTTOM, 1100 PSI OFF BOTTOM '- 50 RPM, 5-7 KFT-LBS TORQUE ON BOTTOM, - 3-4 KFT-LBS TORQUE OFF BOTTOM -25 KLBS WOB - PU = 97 KLBS, SO = 94 KLBS, ROT = 97 KLBS -SURVEY EVERY -94' MD FOR DOGLEGS< •5"/100' -MUD WEIGHT =8.8 PPG IN/OUT -NO LOSSES TO FORMATION WHILE DRILLING AHEAD NO BACKREAMING AT CONNECTIONS 0690 - 12 D0 6.00 DRILL P 1,774.00 T SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 1434' MD TO 1774' MD (340' IN 6 HOURS ,= 57 FPH WITH CONNECTIONS AND SURVEYS) -INSTANTANEOUS ROP=80-150 FPH - 550-600 GPM, 1400-1600 PSI ON BOTTOM, 1100-1200 PSI OFF BOTTOM - 20-25 KLBS WOB - PU = 117 KLBS, SO = 105 KLBS, ROT = 107 KLBS - SURVEY EVERY -94' MD FOR DOGLEGS < 5"/100' - MUD WEIGHT = 8.8 PPG IN/OUT - NO LOSSES TO FORMATION WHILE DRILLING AHEAD - NO BACKREAMING AT CONNECTIONS - SLIDE 100% IN ATTEMPT TO BUILD ANGLE TO PLANNED 10° INCLINATION; ASSEMBLY DROPPED TO 4.5' INCLINATION AT 1750'MD 1200 - 1500 3.00 DRILL P 2,010.00 SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 1774' MD TO 2010' MD (236' IN 3 HOURS = 79 FPH WITH CONNECTIONS AND SURVEYS) - INSTANTANEOUS ROP = 70-100 FPH SLIDING, 150-200 FPH ROTATING - 550 GPM, 1400-1500 PSI ON BOTTOM, 1100-1250 PSI OFF BOTTOM - 20-25 KLBS WOB - PU = 120 KLBS, SO = 107 KLBS, ROT= 116 KLBS - SURVEY EVERY -94' MD FOR DOGLEGS < 5°/100' - MUD WEIGHT = 8.8 PPG IN/OUT - NO LOSSES TO FORMATION WHILE DRILLING AHEAD - NO BACKREAMING AT CONNECTIONS - SLIDE 100% IN ATTEMPT TO BUILD ANGLE, EXCEPT FOR 50' AT BASE PERMAFROST; MINIMUM INCLINATION=4.4°AT 1842' MD, INCLINATION AT 2010' MD = &W Printed 8/8/2019 11:57:37AM **Ali depths reported in Drillers Depths— North America - ALASKA - BP Page 5 of 15 Operation Summary Report Common Well Name: PWDW3-2 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/23/2019 End Date', 7/3/2019 X3-019GW-C: (3,884,833.00) Project: PBUSAT Site: PWDW _ -- Rig Name/No.: PARKER 272 Spud Date/time: 6/27/2019 12:01:OOAM Rig Release: 7/7/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level Date From - To His Task Code NPT Total Depth Phase Description of Operations (ho (usft). 15:00 - 18:00 1.00 DRILL P 2,010.00 SURF PLANNED WIPER TRIPAT BASE 16:00 - 17:00 1.00 DRILL P 2,010.00 1700 - 18.00 1.00 DRILL P 2,010.00 18:00 - 00:00 6.00 DRILL P 11415.00 PERMAFROST: CIRCULATE THE HOLE CLEAN WITH 1 BOTTOMS UP - 600 GPM, 1450 PSI BACKREAM AT 50 RPM, 4 KFT-LBS TQ WHILE CIRCULATING TO AVOID WASHING OUT THE HOLE, RACK BACK A STAND EVERY 20 MINUTES - FLOW CHECK WELL FOR 10 MINUTES, STATIC _ - MUD WEIGHT= 8.8 PPG IN/OUT SURF 'PLANNED WIPER TRIP AT BASE PERMAFROST: TRIP OUT OF HOLE WITH 16" DRILLING ASSEMBLY FROM 2010' MD TO PREVIOUS TRIP DEPTH OF 964' MD ON ELEVATORS - PICKUP WEIGHT PULLING OFF BOTTOM = 120 KLBS - MONITOR THE WELL VIA TRIP TANK, GOOD DISPLACEMENT - PULLING SPEED 70-90 FPM - NO ISSUES PULLING OUT OF HOLE _ SURF PLANNED WIPER TRIP AT BASE PERMAFROST: TRIP IN THE HOLE WITH 16" DRILLING ASSEMBLY FROM 964' MD TO 2010' MD ON ELEVATORS - MONITOR THE WELL VIA TRIP TANK, GOOD DISPLACEMENT - RUNNING SPEED 70.90 FPM - NO ISSUES RUNNING IN HOLE SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 2010' MD TO 2669' MD (659' IN 6 HOURS = 110 FPH WITH CONNECTIONS AND SURVEYS) - INSTANTANEOUS ROP = 80-100 FPH SLIDING, 200-300 FPH ROTATING - 550-650 GPM, 1500-2050 PSI ON BOTTOM, 1300-1800 PSI OFF BOTTOM - 50-70 RPM, 5-9 KFT-LBS TORQUE ON BOTTOM, 3-4 KFT-LBS TORQUE OFF BOTTOM - 20-28 KLBS WOB - PU = 137 KLBS, SO = 114 KLBS, ROT = 127 KLBS - SURVEY EVERY ^94' MD FOR DOGLEGS < 5'/100' - MUD WEIGHT = 9.0 PPG IN/OUT - NO LOSSES TO FORMATION WHILE DRILLING AHEAD - NO BACKREAMING AT CONNECTIONS - SLIDE 50-85' PER STAND TO BRING INCLINATION TO PLANNED 10°, THEN BEGIN ROTATING DOWN FULL STANDS; ASSEMBLY IS BUILDING WHILE ROTATING (INC = 12.8° AT MIDNIGHT) - TOTAL DRILLING TIME FOR 24 HOUR PERIOD = 15.5 HOURS (65%) Printed 8/8/2019 11:57:37AM "All depths reported in Drillers Depths" Common Well Name. PWDW3-2 Event Type: DRL- ONSHORE (DON) Proiect: PBUSAT North America - ALASKA- BP Operation Summary Report Start Date: 6/23/2019 End Date: 7/3/2019 Site: PWDW Active datum: ACTUAL KB - P272 @85.79usR (above Mean Sea Level) Date From - To Fire Task Code NPT Total Depth . -_ - _ ___. (hr) (usft) 6/29/2019 00:00 - 05.30 5.50 DRILL P 3,274.00 05:30 - 08:00 2.50 DRILL P 0800 - 09:30 1.50 DRILL P 3,274.00 3,274.00 0930 - 1300 3.50 DRILL P 3274.00 1300 - 1330 0.50 DRILL P 3,274.00 1330 - 1600 2.50 CASING P 3,27400 Page 6 of 15 AFE No X3-019GW-Q (3,884.833.00) Rig Release: 7/7/2019 BPUOI: 500292363400 Phase Description of Operations SURF DIRECTIONAL DRILL 16" SURFACE HOLE FROM 2669' MD TOWARDS PLANNED CASING POINTAT 3274' MD - INSTANTANEOUS ROP = 80-100 FPH -SLIDING, 200-300 FPH ROTATING -650 GPM, 1950-2100 PSI ON BOTTOM, 1850 PSI OFF BOTTOM 70 RPM, 5-9 KFT-LBS TORQUE ON BOTTOM, 34 KFT-LBS TORQUE OFF BOTTOM - 18-28 KLBS WOB - PU = 145 KLBS, SO = 119 KLBS, ROT = 135 KLBS - SURVEY EVERY -94' MO FOR DOGLEGS < 5°/100' - MUD WEIGHT = 9.0 PPG IN/OUT - NO LOSSES TO FORMATION WHILE DRILLING AHEAD - NO BACKREAMING AT CONNECTIONS - ROTATE 100% (EXCLUDING SHORT MAINTENANCE SLIDES) TOP S_V4 AT 2709' MD SURF CIRCULATE HOLE CLEAN WITH 2 BOTTOMS UP - 800 GPM, 2400 PSI - 50 RPM, 5 KFT-LBS TORQUE - MUD WEIGHT IN/OUT = 9.2 PPG - RACK BACK 1 STAND EVERY 15 MIN TO 2960' MD SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 2960' MD TO THE TOP OF THE BHA AT 587' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM AND AT THE TOP OF THE BHA (STATIC) - MUD WEIGHT IN/OUT = 9.2 PPG SURF LAY DOWN BHA FROM 587' MD TO SURFACE - BIT GRADE: 6-7-1/8" OUT OF GAGE SURF CLEAN AND CLEAR RIG FLOOR SURF RIG UP CASING RUNNING EQUIPMENT - RIG UP VOLANT TOOL, SPIDER SLIPS, ELEVATORSAND BAIL EXTENSIONS WBS:SURFCSG Pnnted 6/8/2019 11 57 37A "All depths reported in Drillers Depths" Active datum: ACTUAL KB - P272 Date From - To 16:00 - 00:00 6/30/2019 00:00 - 04:00 04:00 - 08:00 5.79usft (above Mean Sea Level) Him Task Code (hr) 8,00 CASING P 4.00 4.00 CASING P NPT Total Depth (u_sft) 3,274.00 3,274.00 CASING P 3,274.00 BPUOI: 500292363400 Phase Description of Operations SURF RUN 13-3/8",68#, L-80, SURFACE CASING TO 2229' MDAT MIDNIGHT - CHECK FLOATS (HOLDING) - USE BEST -O -LIFE 2000 PIPE DOPE - TORQUE CONNECTIONS TO AVERAGE OF 10,000 FT -LBS TO MAKE UP TO THE MARK - RUN 1 CENTRALIZER PER JOINT TO WITHIN 50' OF CONDUCTOR - FILL CASING EVERY JOINTAND TOP OFF EVERY 10 TO THE BPRF, CIRCULATE DOWN EVERY 10TH JOINT AT 5 BPM, FOR 25 BBL FROM BPRF TO TD - CIRCULATE DOWN JOINTS AS NEEDED -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS - PU 165K, SO 107K AT 2229' MD - MUD WEIGHT: 9.1 PPG IN, 9.1 PPG OUT - WORKTHROUGH TIGHT HOLE WITH UP TO 30K UNDER STRING WEIGHT FROM -1800' MD TO 2_229' MD SURF RUN 13-3/8", 68#, L-80, SURFACE CASING FROM 2229' MD TO PLANNED SET DEPTH AT 3264' MD - USE BEST -O -LIFE 2000 PIPE DOPE MAKE UP BTC CONNECTIONS TO MARK WITH VOLANT TOOL (TORQUE TO AVERAGE OF 10 KFT-LBS) - RUN (1) 13-3/8" X 15-3/4" CENTRALIZER PER JOINT TO WITHIN 50' OF CONDUCTOR - FILL CASING WITH VOLANT TOOL EVERY JOINTAND TOP OFF EVERY 10 TO THE BPRF, CIRCULATE DOWN EVERY 10TH JOINT AT 5 BPM, FOR 25 BBL FROM BPRF TO TD - CIRCULATE DOWN JOINTS AT 5 BPM, 450-650 PSI AS NEEDED FOR TIGHT HOLE (^1800' MD TO THE SV4 BELOW -2900' MD); SIGNIFICANT IMPROVEMENT IN SLACKOFF WEIGHTS AFTER CIRCULATING (FROM 55-65 KLBS TO 120-135 KLBS AT 2900' MD TO 3200' MD) -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS - FINAL PICKUP WEIGHT 240 KLBS, SLACKOFF WEIGHT 145 KLBS - MUD WEIGHT: 9.1 PPG IN/OUT - NO LOSSES TO THE WELL WHILE RUNNING CASING - WASH FINAL THREE JOINTS AND LANDING JOINT DOWN AT 5 BPM, 390 PSI; OBSERVE ^2' OF FILL ON BOTTOM - LAND HANGER ON RING AS PLANNED AT 3264' MD SHOE DEPTH SURF STAGE UP PUMPS TO CEMENTING RATE AND CONDITION MUD TO CEMENTING PROPERTIES - STAGE UP FROM 3 BPM TO 10 BPM IN 1 BPM INCREMENTS, ALLOWING PRESSURE TO STABILIZE AT EACH FLOW RATE - ICP 360 PSI, FCP 190 PSI AT 10 BPM - CIRCULATE A TOTAL OF 8 BOTTOMS UP - FINAL MUD PROPERTIES PRIOR TO CEMENTING: PV = 21, YP = 20, MW =-9.15 PPG Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" North America - ALASKA- BP Page 7 of 15 Operation Summary Report Common Well Name: PWDW3-2 AFE No Event Type. DRL- ONSHORE (DON) Start Date. 6/23/2019 End Date: 7/3/2019 X3-019GW-C: (3,884,833.00 ) Project: PBUSAT Site: PWDW Ria Name/No.: PARKER 272 Spud DateTme: 6/27/2019 12:01:OOAM Rig Release: 7!7/2019 Active datum: ACTUAL KB - P272 Date From - To 16:00 - 00:00 6/30/2019 00:00 - 04:00 04:00 - 08:00 5.79usft (above Mean Sea Level) Him Task Code (hr) 8,00 CASING P 4.00 4.00 CASING P NPT Total Depth (u_sft) 3,274.00 3,274.00 CASING P 3,274.00 BPUOI: 500292363400 Phase Description of Operations SURF RUN 13-3/8",68#, L-80, SURFACE CASING TO 2229' MDAT MIDNIGHT - CHECK FLOATS (HOLDING) - USE BEST -O -LIFE 2000 PIPE DOPE - TORQUE CONNECTIONS TO AVERAGE OF 10,000 FT -LBS TO MAKE UP TO THE MARK - RUN 1 CENTRALIZER PER JOINT TO WITHIN 50' OF CONDUCTOR - FILL CASING EVERY JOINTAND TOP OFF EVERY 10 TO THE BPRF, CIRCULATE DOWN EVERY 10TH JOINT AT 5 BPM, FOR 25 BBL FROM BPRF TO TD - CIRCULATE DOWN JOINTS AS NEEDED -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS - PU 165K, SO 107K AT 2229' MD - MUD WEIGHT: 9.1 PPG IN, 9.1 PPG OUT - WORKTHROUGH TIGHT HOLE WITH UP TO 30K UNDER STRING WEIGHT FROM -1800' MD TO 2_229' MD SURF RUN 13-3/8", 68#, L-80, SURFACE CASING FROM 2229' MD TO PLANNED SET DEPTH AT 3264' MD - USE BEST -O -LIFE 2000 PIPE DOPE MAKE UP BTC CONNECTIONS TO MARK WITH VOLANT TOOL (TORQUE TO AVERAGE OF 10 KFT-LBS) - RUN (1) 13-3/8" X 15-3/4" CENTRALIZER PER JOINT TO WITHIN 50' OF CONDUCTOR - FILL CASING WITH VOLANT TOOL EVERY JOINTAND TOP OFF EVERY 10 TO THE BPRF, CIRCULATE DOWN EVERY 10TH JOINT AT 5 BPM, FOR 25 BBL FROM BPRF TO TD - CIRCULATE DOWN JOINTS AT 5 BPM, 450-650 PSI AS NEEDED FOR TIGHT HOLE (^1800' MD TO THE SV4 BELOW -2900' MD); SIGNIFICANT IMPROVEMENT IN SLACKOFF WEIGHTS AFTER CIRCULATING (FROM 55-65 KLBS TO 120-135 KLBS AT 2900' MD TO 3200' MD) -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS - FINAL PICKUP WEIGHT 240 KLBS, SLACKOFF WEIGHT 145 KLBS - MUD WEIGHT: 9.1 PPG IN/OUT - NO LOSSES TO THE WELL WHILE RUNNING CASING - WASH FINAL THREE JOINTS AND LANDING JOINT DOWN AT 5 BPM, 390 PSI; OBSERVE ^2' OF FILL ON BOTTOM - LAND HANGER ON RING AS PLANNED AT 3264' MD SHOE DEPTH SURF STAGE UP PUMPS TO CEMENTING RATE AND CONDITION MUD TO CEMENTING PROPERTIES - STAGE UP FROM 3 BPM TO 10 BPM IN 1 BPM INCREMENTS, ALLOWING PRESSURE TO STABILIZE AT EACH FLOW RATE - ICP 360 PSI, FCP 190 PSI AT 10 BPM - CIRCULATE A TOTAL OF 8 BOTTOMS UP - FINAL MUD PROPERTIES PRIOR TO CEMENTING: PV = 21, YP = 20, MW =-9.15 PPG Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 15 Common Well Name: PWDW3-2 AFE No Event Type'. DRL- ONSHORE (DON) Start Date. 6/23/2019 End Date: 7/3/2019 X3-019GW-C:(3,884, 833.00) Project PBUSAT Site: PWDW SURF CEMENT 13-3l8", 6811, L-80, BTC SURFACE Rig Name/No.: PARKER 272 Spud Date/time: 6/27/2019 12:01:OOAM Rig Release: 7!//2019 Rig Contractor. PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) TEST TO 250 PSI LOW, 4000 PSI HIGH FOR 5 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (110 (us8) 08:00 - 13:00 5.00 CASING P 3,274.00 SURF CEMENT 13-3l8", 6811, L-80, BTC SURFACE CASING AS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW, 4000 PSI HIGH FOR 5 MINUTES EACH - PUMP 100 BBLS OF 10.0 PPG MUDPUSH II SPACER @ 6 BPM, 350 PSI '- DISENGAGE VOLANT TOOLAND RELEASE BOTTOM PLUG. VISUALLY INSPECT BURST DISC AFTER PUSHING DOWN WITH PLUG LAUNCHING TOOL (INTACT) - PUMP 613 BBLS (1802 SACKSI OF it 0 PPC LITECRETE LEAD CEMENT @ 6 BPM - PLANNED LEAD VOLUME = 730 BELS, EXCESS VOLUME 350% ABOVE THE PERMAFROST AND 40% EXCESS BELOW THE PERMAFROST (YIELD 1.91 CU.FT/SK); STOP PUMPING LEADAND SWAP TO TAIL WHEN MUDPUSH OBSERVED BACK TO SURFACE - RECIPROCATE PIPE WITH 10' STROKES WHILE PUMPING, LAND ON RING AS EACH FLUID INTERFACE EXITS THE SHOE. STOP RECIPROCATION WHEN HOLE CONDITIONS DETERIORATED PART WAY THROUGH PUMPING TAIL CEMENT. - OBSERVE BOTTOM PLUG LAND ON STROKES (RETURN FLOW STOPPED) - PUMP 65 BBLS (315 SACKS) OF 15.8 PPG CLASS G TAIL @ 3-5 BPM (YIELD 1.16 CU.FT/SK) - DISENGAGE VOLANT TOOL AND RELEASE TOP PLUG - SCHLUMBERGER KICK OUT WITH 10 BBLS FRESH WATER - PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.1 PPG MAXDRIL-N PER SLB CEMENTICS PROGRAM - 392 BBLS DISPLACED AT 10 BPM: ICP 610 PSI, FCP 1080 PSI - 45 BBLS DISPLACED AT 7 BPM: ICP 834 PSI, FCP 910 PSI - REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 708 PSI - BUMP PLUG AT 4556 STROKES (ACTUAL PUMP EFFICIENCY 99.6%) AND INCREASE PRESSURE TO 1200 PSI. HOLD 1200 PSI FOR 5 MINUTES. BLEED OFF PRESSURE TO CHECK FLOATS -FLOATS GOOD. - TOTAL DISPLACEMENT VOLUME 476.1 BBLS - NO RECIPROCATION DURING DISPLACEMENT - 190 BELS OF CEMENT RETURNED TO SURFACE (CORRELATES TO 115% EXCESS IN PERMAFROST ASSUMING 40% EXCESS BELOW PERMAFROST) - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 23 BBLS - CEMENT IN PLACE AT 12:20 PM Printed 8/8/2019 11 57 37A **All depths reported in Drillers Depths** Common Well Name: PWDW3-2 Event Type. DRL- ONSHORE(DON) Project: PBUSAT North America - ALASKA- BP Operation Summary Report Start Date: 6/2312019 End Dale. 7/3/2019 Site: PWDW Spud DateTme: 6/27/2019 12:01:OOAM AFE No X3-019GW-C'. (3,884,833 00 ) Page 9 of 15 Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Levey BPUOI: 500292363400 Dale From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ _ 13:00 - 16:30 3.50 CASING P 3,274.00 SURF RIGDOWN AFTER CEMENT JOB - RIG DOWN CEMENT LINE - LAY DOWN LANDING JOINT -RIG DOWN VOLANT TOOLAND BAIL EXTENSIONS - DRAIN STACK AND FLUSH WITH BLACK WATER PILL, FUNCTION DIVERTER TO CLEAR CEMENT, MUD AND CLAY/GRAVEL - CLEAN PITS AND PREPARE TO TAKE ON LSND FLUID FOR NEXT HOLE SECTION 16.30 - 21:30 5.00 WHSUR P 3274.00 SURF NIPPLE DOWN DIVERTER AND 21-1/4" RISER SIMOPS: - CHANGE SAVER SUB AND UPPER AND 'LOWER IBOP - TAKE ON 9.6 PPG LSND FLUID FOR PRODUCTION HOLE SECTION 21:30 - 0000 2.50 WHSUR P 3,274.00 SURF NIPPLE UP FMC 13-5/8" NEW STANDARD BIG BORE WELLHEAD AND 13-5/8" HIGH PRESSURE RISERS - NIPPLE UP SPEED HEAD AND TORQUE ALL BOLTS TO SPEC NIPPLE UP RISER SPOOLS 7/1/2019 0000 - 01:00 1.00 WHSUR P 3,274.00 SURF CONTINUE TO NIPPLE UP 13-5/8" HIGH PRESSURE RISERSAND PRESSURE TEST WELLHEAD TO 1000 PSI FOR 15 MINS(PASS) 01:00 - 04:00 3.00 BOPSUR P 3,274.00 SURF NIPPLE UP BOPE IN THE FOLLOWING CONFIGURATION: ANNULAR PREVENTER, 9-5/8" FIXED UPPER RAMS, BLIND / SHEAR RAMS, MUD CROSS, 4-1/2" X T' VARIABLE LOWER RAMS 0400 - 11:00 7.00 BOPSUR P 3,274.00 SURF PRESSURE TEST ROPE TO 250 PSI LOWAND 5000 PSI HIGH (RAMS), 3500 PSI HIGH (ANNULAR) FOR 5 MIN EACH -AOGCC REP MATT HERRERA WAIVES WITNESS (24 HOUR NOTIFICATION PROVIDED 6/29/19 AT 10:28) - TEST THE ANNULAR WITH 5" TEST JOINT - TEST THE 9-5/8" FBRS WITH 9-5/8" TEST JOINT - TEST THE 4-1/2" X 7" VBRS WITH 5" AND 7" TEST JOINTS - FAIUPASS ON CHOKE VALVE NUMBER 10 (RE -BUILT IN PLACE), ALL OTHER TESTS PASS - PERFORM BLACKOUT TEST ON CONTROL PANELS - TEST ALARMS, PVT AND FLOW SHOW - RAM LOCKS NOT TESTED PER EMOC 10475 THAT PERMITS TESTING AT 6 MONTH INTERVAL (LAST TEST 4-29-19) - RE -TORQUE ALL BOLTS TO SPEC AFTER SHELLTEST SEE ATTACHED PRESSURE TESTING CHART 1100 - 1330 2.50 BOPSUR P 3,274.00 SURF CONTINUE TESTING BOPE - SEE DETAILS IN TIME ENTRYABOVE - TIME BROKEN OUT FOR ZERO RIG RATE (TIME TO NIPPLE UP AND TEST BOPE EXCEEDEDALLOTED 10 HOURS PER CONTRACT) Printed 8/8/2019 11:57.37AM **All depths reported in Drillers Depths" Common Well Name. PWDW3-2 Event Type'. DRL- ONSHORE (DON) North America -ALASKA - BP Page 10 of 15 Operation Summary Report AFE No Start Date: 6/23/2019 End Date. 7/3/2019 X3-019GW-C (3,884 833 00 ) Project: PBUSAT Site: PWDW Rig Name/No.: PARKER 272 Spud Date/Time: 6/27/2019 12:01:00AM Rig Release: 777/2019 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Le Date From - To Him Task (hr) 13:30 - 14'.30 1.00 BOPSUR 1430 - 1600 1.50 CASING 1600 - 1990 300 DRILL 1900 - 2000'. 100 DRILL 2000 - 21:00 1 1.00 21:00 - 22:00 1.00 Code NPT Total Depth Phase Description of Operations _(usft)_ _ P 3,274.00 SURF RIG DOWN ROPE TESTING EQUIPMENT AND SET 12-3/4" WEAR RING _ P 3,274.00 SURF PRESSURE TEST 13-3/8" SURFACE CASING TO 3500 PSI FOR 30 MINUTES AGAINST CLOSED BLIND/SHEAR RAMS - MUD WEIGHT 9.1 PPG, 7.8 BBLS TO PRESSURE UP, 7.8 BBLS BLED '- PASSING TEST PER BP PRACTICE 100218 ACCEPTANCE CRITERIA 313 (15 PSI LOST IN FIRST 15 MINUTES, 0 PSI LOST IN SECOND 15 MINUTES) - SEEATTACHED PRESSURE TESTING CHART AND CALCULATOR - RECEIVED WSUP APPROVAL TO PROCEED P 3.274.00 SURF MAKE UP 12-1/4" PRODUCTION HOLE RSS DRILLING ASSEMBLY FROM SURFACE TO 712' MD - NEW HYCALOG 12-1/4" TK66 PDC BIT, 9-1/2" AUTOTRAK RSS WITH PORTED FLOAT, ONTRAK (DIR / GR / RES / PWD) - RUN SMITH 6-1/2" HYDRAULIC JARS 559' BEHIND THE BIT _ P 3.274.00 SURF TRIP IN HOLE WITH 12-1/4" PRODUCTION HOLE DRILLING ASSEMBLY FROM THE TOP OF THE BHAAT 712' MD TO 2000' MD ON ELEVATORS - FILL PIPE EVERY 20 STANDS - TRIPPING SPEED 150 FPM - MONITOR WELL VIA TRIP TANK (GOOD DISPLACEMENT) - MUD WEIGHT 9.1 PPG IN/OUT - SHALLOW HOLE TEST MWD TOOLS AT 2000' MD GOOD TEST DRILL P 3,274.00 SURF SLIPAND CUT 78' OF 1-3/8" DRILLING LINE (9 DRILL 2200. - 22:30 0.50 DRILL 22.30 - 00:00 1.50 DRILL WRAPS) P 3,274.00 SURF TRIP IN THE HOLE WITH 12-1/4" PRODUCTION HOLE DRILLING ASSEMBLY FROM 2000' MD TO 3075' MD (100' ABOVE FLOAT COLLAR) - TRIPPING SPEED 150 FPM - MONITOR WELL VIATRIP TANK (GOOD DISPLACEMENT) MUD WEIGHT 9.1 PPG IN/OUT P 3,274.00 SURF WASH DOWN WITH 12-1/4" PRODUCTION HOLE DRILLING ASSEMBLY FROM 3075' MD TO 3161' MD - 450 GPM, 650 PSI - TAG CEMENT STRINGERS AT 3152' MD (23' ABOVE FLOAT COLLAR), INITIATE ROTATION AT 45 RPM, 5 KFT-LBS TO AND CONTINUE WASHING DOWN - TAG HARD CEMENT AT 3161' MD (14' ABOVE FLOAT COLLAR) P 3,274.00 SURF DRILL SHOE TRACK, CEMENT PLUGS AND FLOAT EQUIPMENT FROM 3161' MD TO 3254' MD (10' FROM THE 13-3/8" SHOE) -650 GPM, 1300 PSI, 45-120 RPM, 5-8 KFT-LBS To, 3-15 KLBS WOB -TAG CEMENT PLUGS AT 3273'MD(ON DEPTH) - 29 MINUTES TO DRILL CEMENT PLUGS, 38 MINUTES TO DRILL FLOAT COLLAR Printed 8/812019 11:57:37AM ••AAI depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name'. PWDW3-2 Event Type: DRL- ONSHORE(DON) Start Date: 6/23/2019 Project: PBUSAT Site: PWOW End Dale: 7/3/2019 X3-019GW-C: (3,884,833.00 ) Page 11 of 15 Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) BPUOI: 500292363400 Date From - To Hire Task Code NPT Total Depth Phase Description of Operations _ L (hr)_ (usH)_ 7/2/2019 00:00 - 00:30 0.50 DRILL P 3,274.00 SURF CONTINUE TO DRILL 13-3/8" SHOE TRACK TO 3254' MD (10' FROM THE 13-3/8" SHOE) _ - SEE DETAILS IN PREVIOUS REPORT 00:30 - 01:00 0.50 DRILL P 3,274.00 SURF DISPLACE WELL FROM 9.1 PPG MAXDRIL-N TO 9.6 PPG LSND - 950 GPM, 1700-1800 PSI, 120 RPM, 4 KFT-LBS To - PUMP 40 BBL 8.3 PPG HI -VIS FRESH WATER SPACER AND 40 BBL 9.6 PPG HI -VIS -SND SPACER AHEAD OF FULL HOLE VOLUME OF 9.6 PPG LEND MUD - ROTATE AND RECIPROCATE FULL STAND WHILE DISPLACING - TRACK BBL IN / BBL OUT FOR DISPLACEMENT 01:00 - 01:30 0.50 DRILL P 3,274.00 SURF DRILL OUT REMAINING 10'OF SHOE TRACK AND 10' OF RATHOLE FROM 3254' MD TO 3274' MD - 650 GPM, 950-1000 PSI, 120 RPM, 4 KFT-LBS TO, 2-9 KLBS WOB _ 01:30 - 0200 0.50 DRILL P 3,294.00 SURF DRILL 20'OF NEW FORMATION FROM 3274' MD TO LOT DEPTH AT 3294' MD - 975 GPM, 2000 PSI, 120 RPM, 4 KFT-LBS TO, 3-5 KLBS WOB 0200 - 0230 0.50 DRILL P 3,294.00 SURF CIRCULATE ONE BOTTOMS UP PRIOR TO PERFORMING LOT - 975 GPM, 2000 PSI, 120 RPM, 4 KFT-LBS To, 5 KLBS WOB -ROTATE AND RECIPROCATE FULL STAND WHILE CIRCULATING - FLOW CHECK WELL FOR 10 MINS AFTER _ BOTTOMS UP, STATIC 02:30 - 03:30 1.00 DRILL P 3,294.00 SURF PERFORM LOT ON 13-3/8" CASING SHOE TO 15.4 PPG - 3254' MD, 3225' TVD, 9.6 PPG MW, 980 PSI APPLIED SURFACE PRESSURE - PRESSURE BLEEDS FROM 980 PSI TO 740 PSI OVER 10 MIN - 5 BBLS TO PRESSURE UP, 5 BBLS BLED BACK - OBTAIN AUTHORIZATION TO PROCEED FROM ODE - SEE ATTACHED LOT CHART AND CALCULATOR Printed 8/8/2019 11'67:37AM "AII depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. PWDW3-2 Event Type: DRI-- ONSHORE (DON) Start Date: 6/23/2019 End Date: 7/3/2019 Project: PBUSAT Site: PWDW Rig Name/No.: PARKER 272 Spud Date/Time: 6/27/2019 12:01:OOAM AFE No K3-019GW-C: (3,884 833 00 ) Rig Page 12 of 15 Rig Contractor: PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (110 _ (usft) _ _ 03:30 - 12:00 8.50 DRILL P 4,687.00 PRODi DIRECTIONAL DRILL 12-114" PRODUCTION HOLE FROM 3294' MD TO 4687' MD (1393' IN 8.5 HRS = 164 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP = 150-270 FPH (AUTODRILLER LIMIT SET TO 270 FPH FOR HOLE CLEANING) - 975 GPM, 2000-2300 PSI, 120 RPM, 4-11 KFT-LBS TO, 6-18 KLBS WOB -MW IN/OUT =9.6 PPG - ECD: ACTUAL= 10.0-10.2 PPG, CALC = 9.9 PPG, HARDLINE = 11.5 PPG - NO LOSSES TO FORMATION WHILE DRILLINGAHEAD - SURVEY EVERY 100' FOR DOGLEGS < 5°1100' - NO BACKREAMING AT CONNECTIONS - OBTAIN FIRST DIRECTIONAL SURVEY 97' FROM LAST SURVEY IN SURFACE HOLE - DRILLING ON DIRECTIONAL PLAN WITH NO ISSUES - 13-3/8" CASING SHOE LOGGED ON DEPTH 12:00 - 15:30 3.50 DRILL P PUMP SWEEPS AS FOLLOWS: - 3740' MD: 40 BBL HI -VIS, 0% INCREASE IN CUTTINGS - 4405' MD: 40 BBL HI -VIS, 25% INCREASE IN CUTTINGS FORMATION TOPS: - SV3 @ 3344' MD - SV2 @ 3551' MD - SVII @ 3966' MD - UG4 @ 4534' MD - UG4A @ 4548' MD WBS: PROD? 5,190.00 PROD? DIRECTIONAL DRILL 12-114" PRODUCTION HOLE FROM 4687' MD TO 5190' MD (503' IN 3.5 HRS = 144 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP = 150-270 FPH (AUTODRILLER LIMIT SET TO 270 FPH FOR HOLE CLEANING) - 975 GPM, 2200-2400 PSI, 120 RPM, 4-12 KFT-LBS TO, 6-18 KLBS WOB - MW IN/OUT = 9.6 PPG - ECD :ACTUAL =10.0-10.2 PPG, CALC=9.9 PPG, HARDLINE = 11.5 PPG NO LOSSES TO FORMATION WHILE DRILLING AHEAD - SURVEY EVERY 100' FOR DOGLEGS < 5°/100' - NO BACKREAMING AT CONNECTIONS - DRILLING ON DIRECTIONAL PLAN WITH NO ISSUES PUMP SWEEPS AS FOLLOWS: - 4995' MD: 40 BBL HI -VIS, 75% INCREASE IN CUTTINGS TOP UG3 @ 4803' MD Printed 8/8/2019 11:57:37AM **All depths reported in Drillers Depths" Common Well Name: PWDW3-2 Event Type-. DRL- ONSHORE (DON) Project: PBUSAT North America - ALASKA - BP Page 13 of 15 Operation Summary Report AFE No Start Date: 6/23/2019 End Date: 7/3/2019 X3-019GW-C: (3,884,83300) Site: PWDW 12:01:OOAM Rig Contractor. PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 15:30 - 17:00 1.50 DRILL P 5,190.00 PROD1 SECURE THE WELL AFTER POSITIVE FLOW CHECK -OBSERVE 3% LEL IN SHAKER ROOM, GRADUALLY BUILDING TO 6% LEL - SPACE OUT AND FLOW CHECK THE WELL, GAS BREAKING OUT AT THE BELL NIPPLE AND WELL FLOWING - SECURE THE WELL WITH ANNULAR PREVENTER: SIDPP = 0 PSI, SICP = 0 PSI OVER 25 MINUTE MONITORING PERIOD - NOTE: IBOP WAS NOT CLOSED DURING THE . FLOW CHECKAND TOP DRIVE WAS HIGH IN THEAIR, SO THE FLOW COULD HAVE BEEN U -TUBING DOWN THE DRILL PIPE '- MAKE NOTIFICATIONS AND DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM; APPROVAL GIVEN TO OPEN THE WELLAND FLOW CHECK THROUGH OPEN CHOKE - FILL THE MUD GAS SEPERATOR AND OPEN THE WELL VIA THE CHOKE; FLOW CHECK FOR 10 MINS. STATIC ''- OPEN THE ANNULAR PREVENTER AND CIRCULATE BOTTOMS UP, NO FURTHER GAS .OBSERVED (0% LEL) AT SURFACE - GAS SHOW WAS LIKELY DUE TO HYDROCARBON BEARING COAL SEAMS NEAR THE TOP OF THE UG3 _ 17:00 - 00'.00 7.00 DRILL P 6,10500 PROD1 DIRECTIONAL DRILL 12-1/4" PRODUCTION HOLE FROM 5190' MD TO 6105' MD (915' IN 7 HRS = 131 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP = 100-270 FPH (AUTODRILLER LIMIT SET TO 270 FPH FOR HOLE CLEANING) - 975 GPM, 2400-2700 PSI, 120 RPM, 6-15 KFT-LBS TO, 6-20 KLBS WOB - MW IN/OUT = 9.6 PPG - ECD: ACTUAL = 10.040.2 PPG, CALC = 9.9 PPG, HARDLINE = 11.5 PPG - NO LOSSES TO FORMATION WHILE DRILLING AHEAD - SURVEY EVERY 100' FOR DOGLEGS < 5°/100' - NO BACKREAMING AT CONNECTIONS -DRILLING ON DIRECTIONAL PLAN WITH NO ISSUES -ACTUAL DRILLING TIME FOR 24 HR PERIOD = 12.7 HRS PUMP SWEEPS AS FOLLOWS: - 5630' MD: 40 BBL HI -VIS, 75% INCREASE IN CUTTINGS - 5916' MD: 40 BBL HI -VIS, 50% INCREASE IN CUTTINGS FORMATION TOPS: - UG1 @ 5308' MD - WS2 @_S920' MD Printed 6/6/2019 11 5737AM **All depths reported in Drillers Depths" Common Well Name: PWDW3-2 Event Type: DRL- ONSHORE (DON) PBUSAT North America - ALASKA- BP Operation Summary Report Start Date'. 6/23/2019 End Date: 7/3/2019 SitePWDW Active datum: ACTUAL KB - P272 (ID85.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth .. (hr) _.. _ (usft) Meg 00 - 02:30 2.50 DRILL P 6,317.00 Phase AFE No X3-019GW-C'. (3,884,83300) BPUOI: 500292363400 Description of Operations Page 14 of 15 PROD1 DIRECTIONAL DRILL 12-1/4" PRODUCTION HOLE FROM 6105' MD TO SECTION TD IN THE WS1 AT 6317' MD, 6231' TVD (212' IN 2 HRS = 106 P WITH CONNECTIONS) -- INSTANTANEOUS ROP = 100-270 FPH (AUTODRILLER LIMIT SET TO 270 FPH FOR HOLE CLEANING) 975 GPM, 2650-2750 PSI, 120 RPM, 8-15 KFT-LBS TO, 12-20 KLBS WOB - MW IN/OUT = 9.6 PPG - ECD: ACTUAL = 10.0-10.2 PPG, CALC = 9.9 PPG, HARDLINE = 11.5 PPG - NO LOSSES TO FORMATION WHILE DRILLING AHEAD SURVEY EVERY 100' FOR DOGLEGS < 5°/100' - NO BACKREAMING AT CONNECTIONS - DRILLING ON DIRECTIONAL PLAN WITH NO ISSUES . 12-1/4" PRODUCTION HOLE: 3043' DRILLED IN 22.5 HOURS (AVERAGE OF 135 FPH FROM START TO FINISH) PUMP SWEEPS AS FOLLOWS: 5630' MD: 40 BBL HI -VIS, 75% INCREASE IN CUTTINGS - 5916' MD: 40 BBL HI -VIS, 50% INCREASE IN CUTTINGS FORMATION TOPS: - UG1 @ 5308' MD - WS2 @ 5920' MD 0230 - 04'.00 1.50 DRILL P 6,317.00 PROD1 PLANNED SHORT TRIP: CIRCULATE THE HOLE CLEAN WITH TWO BOTTOMS UP PRIOR TO SHORT TRIP - 975 GPM, ICP 2750 PSI, FOP 2600 PSI, 120 RPM, 7 KFT-LBS TO - ECD: ACTUAL 10.1 PPG, CALC 9.9 PPG, HARDLINE 11.5 PPG - PUMP 40 BBL HI -VIS SWEEP ON BOTTOM, 25% INCREASE IN CUTTINGS - ROTATE AND RACK BACK ONE STAND EVERY 20 MINUTES WHILE CIRCULATING 0400 - 0800 4.00 DRILL P 6,317.00 PROD1 PLANNED SHORT TRIP: TRIP OUT OF THE HOLE WITH 12-1/4" DRILLING ASSEMBLY FROM 6040' MD TO 3262' MD -FLOW CHECK WELL FOR 10 MIN, STATIC - FINAL HOOKLOADS PULLING OFF BOTTOM'. PU 192 KLBS, SO 165 KLBS, ROT 170 KLBS - MONITOR THE WELL VIA TRIP TANK, GOOD DISPLACEMENT - PULLING SPEED 2045 FPM -ENCOUNTER TIGHT HOLE IMMEDIATELY AFTER PULLING OFF BOTTOM WITH CONSISTENT 10-20 KLBS DRAG AND UP TO :40 KLBS OVERPULL; WIPE EACH STAND CLEAN, TIGHT SPOT MOVING UPHOLE - PULL ON ELEVATORS TO 4047 MD - BACKREAM FROM 4047 MD TO 3262' MD - 120 RPM, 8 KFT-LBS TORQUE, 975 GPM, 2230 PSI Printed 8/8/2019 11 57 37A .*All depths reported in Drillers Depths" Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Date From - To Hm Task (hr) 08:00 - 10:00 2.00 DRILL 10:00 - 11:30 1.50 DRILL 11:30 - 1300 1.50 DRILL 13:00 - 15:00 2.00 DRILL 1500 - 1600 1.00 DRILL 16:00 - 17:00 1.00 DRILL 1700 - 1800 1.00 DRILL 1800 - 20'.30 2.50 DRILL Code NPT Total Depth North America - ALASKA - BP Page 15 of 15 (usft) Operation Summary Report Common Well Name. PWDW3-2 AFE No Event Type: DRL- ONSHORE (DON) Start Date. 6/23/2019 End Date: 7/3/2019 X3-019GW-C: (3,884,83300 ) Project: PBUSAT Site: PWDW Rig Name/No.: PARKER 272 Spud Daternme. 6/27/2019 12:01:OOAM Rig Release: 7/7/2019 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Date From - To Hm Task (hr) 08:00 - 10:00 2.00 DRILL 10:00 - 11:30 1.50 DRILL 11:30 - 1300 1.50 DRILL 13:00 - 15:00 2.00 DRILL 1500 - 1600 1.00 DRILL 16:00 - 17:00 1.00 DRILL 1700 - 1800 1.00 DRILL 1800 - 20'.30 2.50 DRILL Code NPT Total Depth Phase Description of Operations (usft) P 6,317.00 PROD1 PLANNED SHORT TRIP: CIRCULATE THE HOLE CLEAN - STAGE UP PUMPS IN 1 BPM INCREMENTS TO DRILLING RATE OF 975 GPM - 975 GPM, 2161 PSI, 120 RPM, 7 KFT-LBS TO P 6,317.00 PROD1 PLANNED SHORT TRIP: RUN IN THE HOLE ON ELEVATORS FROM 3256' MD TO 6317 MD '- FILL PIPE EVERY 1500' MD - MUD WEIGHT IN/OUT = 9.6 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - 20K LBS ADDITIONAL DRAG FROM 4300' MD TO 4700' MD - WASH LAST STAND TO 6317 MD - PU 202 KLBS, SO 162 KLBS AT 6317' MD P 6,317.00 PROW CIRCULATE 2X BOTTOMS UP AT TD -CIRCULATE A HIGH -VIS SWEEP - 975 GPM, 2635 PSI - PULL FROM 6317 MD TO 5974' MD AT 15 MIN _ PER STAND WHILE CIRCULATING P 6,317.00 PROD1 PUMP OUT OF THE HOLE FROM 5900' MD TO 4700' MD DUE TO WELL OUT OF BALANCE -MONITOR WELL PRIOR TO PULLING -- FLUIDS OUT OF BALANCE, FLOWING OUT DRILL PIPE BLEND FLUIDS IN PIT SYSTEM P 6,317.00 PROD1 CONTINUE TO PULL OUT OF THE HOLE ON ELEVATORS FROM 4700' MD TO 3250' MD - PU 137 KLBS, SO 97 KLBS AT 3250' MO - MUD WEIGHT IN/OUT = 9.6 PPG - MONITOR WELL WITH TRIP TANK AND HOLE FILL: HOLE TAKING PROPER FILL P 6,31200 PROD1 CIRCULATE BOTTOMS UPAT 13-3/8" CASING SHOE - 975 GPM, 2324 PSI - MUD WEIGHT IN/OUT = 9.6 PPG _ - MONITOR WELL FOR 10 MIN: STATIC P 6,317.00 PROD1 CONTINUE TO PULLOUT OF THE HOLE ON • ELEVATORS FROM 3250' MD TO 712' MD - PU 77 KLBS, SO 77 KLBS AT 712' MD - MUD WEIGHT IN/OUT = 9.6 PPG - MONITOR WELL WITH TRIP TANKAND HOLE FILL: HOLE TAKING PROPER FILL - MONITOR WELL FOR 10 MIN: STATIC P 6,31700 PROD? PULLAND LAY DOWN BHA#2 PER BAKER MWD/DD - LAY DOWN 5" HWDPAND JARS TO PIPE SHED - DULL BIT GRADE: i - 1 - CT - A - X - IN - BT - TD END PWDW3-2 DON EVENT AT 20:30 HRS Printed 8/e/2019 11:57:37AM "'All depths reported in Drillers Depths' Common Well Name. PWDW3-2 Event Type: COM- ONSHORE (CON) Project: PBUSAT Rig Name/No.: PARKER 272 Active datum: ACTUAL KB - P272 �a Date From - To 7/3/2019 20:30 - 21:00 North America - ALASKA - BP Operation Summary Report Start Date: 7/3/2019 End Dale: 7/7/2019 Site: PWDW Spud Daterrime: 6/27/2019 12*01:OOAM 9usft (above Mean Sea Level) Hrs Task Code (hr) 0.50 CASING P 21:00 - 23:00 2.00 CASING P 23:00 - 00:00 1.00 CASING P Page 1 of 8 AFE No X3-019GW-C: (2,972,563.00) BPUOI: 500292363400 NPT Total Depth Phase Description of Operations _ (usft) 6,317.00 RUNPRD CLEAN AND CLEAR RIG FLOOR. REMOVE BHA COMPONENTS FROM RIG FLOOR 'WBS: RUNPRD _ 6,317.00 RUNPRD RIG UP TO RUN 9-5/8" PRODUCTION CASING - RIG UP VOLANT TOOL, BAIL EXTENSIONS AND 9-5/8" HANDLING EQUIPMENT - RIG UP DOYON CASING FOR TORQUE TURN WITH VOLANT TOOL - PULL AND LAY DOWN WEAR RING SIMOPS: - AD: MAKE UP DRY HOLE TREE AND ADAPTER FLANGE IN BOP DECK -AD: MAKE _UP HANGER WITH FMC REP 6,317.00 RUNPRD RUN 9-5/8", 47#/FT, LBO, VAM21 CASING TO 125' MD - BAKERLOK SHOE TRACK -CHECK FLOATS: HOLDING - USE JET -LUBE SEAL GUARD PIPE DOPE - TORQUE VAM21 CONNECTIONS TO 31550 FT -LBS '- RUN IN THE HOLE AT 90 FT/MIN - MUD WEIGHT IN/OUT = 9.6 PPG 7/4/2019 0000 - 0630 6.50 CASING P 6,317.00 RUNPRD CONTINUE TO RUN 9-5/8", 47#/FT, LBO, VAM21 CASING FROM 125' MD TO 3262' MD, 13-3/8" CASING SHOE - USE JET -LUBE SEAL GUARD PIPE DOPE TORQUE VAM21 CONNECTIONS TO 31550 FT -LBS - RUN IN THE HOLEAT 90 FT/MIN - MUD WEIGHT IN/OUT = 9.6 PPG - FILL CASING ON THE FLY AND TOP OFF EVERY 10 JOINTS - OBTAIN PU / SO WEIGHTS EVERY 10 JTS - PU 160 KLBS, SO 150 KLBS AT 3262' MD CENTRALIZATION: - (1) 9-518" X 12" VOLANT HYDROFORM CENTRALIZER LOCKED DOWN 5' FROM PIN ON SHOE TRACK JOINT A - (1) 9-518" X 12" VOLANT HYDROFORM CENTRALIZER LOCKED DOWN MID JOINT ON SHOE TRACK JOINT B - (1) 9-5/8" X 12" VOLANT HYDROFORM CENTRALIZER FREE FLOATING ON SHOE TRACK JOINT - (1) 9-518" X 12" VOLANT HYDROFORM CENTRALIZER FREE FLOATING ON JOINTS 1-62 WITH STOP RING 5' AND 15' FROM PIN - 65 TOTAL CENTRALIZERS, 130 TOTAL STOP RINGS 06:30 - 07:00 0.50 CASING P 6,317.00 RUNPRD CIRCULATE A BOTTOMS UP PRIOR TO ENTERING OPEN HOLE STAGE UP TO 7 BPM, 150 PSI - FLOW CHECK WELL PRIOR TO CONTINUING TO RUN IN OPEN HOLE: STATIC Printed 8/8/2019 11:59:01AM "All depths reported in Drillers Depths" 1200 - 1900 7.00 19:00 - 0000 500 ' SIMOPS: -CONDITION MUD AT 5 BPM, 150 PSI CASING P 6,317.00 RUNPRD CONTINUE TO RUN 9-5/8", 47#/FT, LBO, VAM21 CASING FROM 3925' MD TO 6308' MD - USE JET -LUBE SEAL GUARD PIPE DOPE TORQUE VAM21 CONNECTIONS TO 31550 FT -LBS - RUN IN THE HOLE AT 90 FT/MIN . -MUD WEIGHT IN/OUT = 9.7/9.8 PPG - FILL CASING ON THE FLY AND TOP OFF EVERY 5 JOINTS - BREAK CIRCULATION EVERY 5 JOINTS AND WASHDOWN AT 5 BPM FOR 5 MIN - OBTAIN PU / SO WEIGHTS EVERY 200 FEET NO LOSSES WHILE RUNNING IN THE HOLE - MAKE UP HANGER PER FMC AND WASH DOWN ATS BPM - PU 304 KLBS, SO 234 KLBS WHEN LANDING HANGER CASING P 6,317.00 RUNPRD CIRCULATE AND CONDITION MUD PRIOR TO CEMENTING - RIG UP CEMENT LINE TO VOLANT - STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF BPM. -2 BPM, 255 PSI, 8% RETURN FLOW - 3 BPM, 280 PSI, 10% RETURN FLOW - 4 BPM, 310 PSI, 12% RETURN FLOW - 5 BPM, 360 PSI, 12% RETURN FLOW - 6 BPM, 420 PSI, 13% RETURN FLOW - 7 BPM, 475 PSI, 14% RETURN FLOW - CONDITION MUD TO 9.65 PPG, 9 PV, 16 YP - INITIAL PRESSUREAT CEMENTING RATE: 475 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 375 PSI - CIRCULATE A TOTAL OF 3x BOTTOMS UP - RECIPROCATED PIPE 15 FT AT SURFACE AT 400 FT/MIN - NO LOSSES WHILE CIRCULATING SIMOPS: - LAY DOWN STANDS OF 5" DRILL PIPE OFF-LINE - RIG UP SCHLUMBERGER CEMENTERS - PRESSURE TEST CEMENT LINES TO 250/4000 PSI FOR 5 CHARTED MIN Printed 8/8/2019 11:59:01AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 2 of 8 Operation Summary Report Common Well Name. PWDW3-2 AFE No Event Type. COM- ONSHORE (CON) Start Date: 7/3/2019 End Date: 7/7/2019 X3-019GW-C: (2,972,563.00) Project: PBUSAT Site: PWDW Rig Name/No.: PARKER 272 Spud Date/Time: 6/27/2019 12:01:OOAM Rig Release: 7/7/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) Date From - To Hrs Task Code NET Total Depth Phase Description of Operations (hr) (usft) 0700 - 09'.30 2.50 CASING P 6,317.00 RUNPRD CONTINUE TO RUN 9-5/8", 47#/FT, LBO, VAM21 CASING FROM 3262' MD TO 3925' MD - USE JET -LUBE SEAL GUARD PIPE DOPE - TORQUE VAM21 CONNECTIONS TO 31550 IFT-LBS - RUN IN THE HOLE AT 90 FT/MIN - MUD WEIGHT IN/OUT = 9.7 PPG '- FILL CASING ON THE FLYAND TOP OFF EVERY 10 JOINTS -OBTAIN PU / SO WEIGHTS EVERY 10 JTS - PU 190 KLBS, SO 170 KLBS AT 3925' MD 0930 - 1000 0.50 CASING P 6,317.00 RUNPRD 'PERFORM RIG SERVICE _-PREPARE TO CHANGE OUT PIPE CAT _CABLE 10:00 - 12:00 2.00 CASING N 1 6,31200 RUNPRD CHANGE OUTWORN OUT PIPE CAT CABLE 1200 - 1900 7.00 19:00 - 0000 500 ' SIMOPS: -CONDITION MUD AT 5 BPM, 150 PSI CASING P 6,317.00 RUNPRD CONTINUE TO RUN 9-5/8", 47#/FT, LBO, VAM21 CASING FROM 3925' MD TO 6308' MD - USE JET -LUBE SEAL GUARD PIPE DOPE TORQUE VAM21 CONNECTIONS TO 31550 FT -LBS - RUN IN THE HOLE AT 90 FT/MIN . -MUD WEIGHT IN/OUT = 9.7/9.8 PPG - FILL CASING ON THE FLY AND TOP OFF EVERY 5 JOINTS - BREAK CIRCULATION EVERY 5 JOINTS AND WASHDOWN AT 5 BPM FOR 5 MIN - OBTAIN PU / SO WEIGHTS EVERY 200 FEET NO LOSSES WHILE RUNNING IN THE HOLE - MAKE UP HANGER PER FMC AND WASH DOWN ATS BPM - PU 304 KLBS, SO 234 KLBS WHEN LANDING HANGER CASING P 6,317.00 RUNPRD CIRCULATE AND CONDITION MUD PRIOR TO CEMENTING - RIG UP CEMENT LINE TO VOLANT - STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF BPM. -2 BPM, 255 PSI, 8% RETURN FLOW - 3 BPM, 280 PSI, 10% RETURN FLOW - 4 BPM, 310 PSI, 12% RETURN FLOW - 5 BPM, 360 PSI, 12% RETURN FLOW - 6 BPM, 420 PSI, 13% RETURN FLOW - 7 BPM, 475 PSI, 14% RETURN FLOW - CONDITION MUD TO 9.65 PPG, 9 PV, 16 YP - INITIAL PRESSUREAT CEMENTING RATE: 475 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 375 PSI - CIRCULATE A TOTAL OF 3x BOTTOMS UP - RECIPROCATED PIPE 15 FT AT SURFACE AT 400 FT/MIN - NO LOSSES WHILE CIRCULATING SIMOPS: - LAY DOWN STANDS OF 5" DRILL PIPE OFF-LINE - RIG UP SCHLUMBERGER CEMENTERS - PRESSURE TEST CEMENT LINES TO 250/4000 PSI FOR 5 CHARTED MIN Printed 8/8/2019 11:59:01AM "All depths reported in Drillers Depths" Common Well Name: PWDW3-2 Event Type: COM- ONSHORE (CON) PBUSAT North America - ALASKA -BP Operation Summary Report AFE No Start Date: 7/3/2019 Site: PWDW End Date: 7/7/2019 (2,972,563.00) Page 3 of 8 Rig Contractor: PARKER DRILLING CO. BPUOI 500292363400 Active datum: ACTUAL KB - P272 @85,79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Desorption of Operations (hr) _ _ (us8) _ 7/5/2019 00:00 - 03:00 3.00 CEMT P 6,317.00 RUNPRD CEMENT 9-5/8" PRODUCTION CASING AS W: - PUMP 60 BBLS OF 12.5 PPG MUDPUSH II SPACER AT 6 BPM, 300 PSI -RELEASE BOTTOM PLUG - PUMP 205 BBLS (1151 SKS (CORRECTED TO 992 SKSA 40% EXCESS VOLUME, OF 15.8 PPG (YIELD: 1.16 CU.FT/SK) UNISLURRY LEAD_ CEMENT AT BPM, 400 PSI - DROP TOP PLUG AND WASH UP CEMENT LINE THROUGH BLEEDER - RECIPROCATE PIPE 15 FT AT SURFACE WHILE PUMPING CEMENT 0390 - 12'.00 9.00 CEMT N 6,317.00 PERFORM DISPLACEMENT WITH RIG PUMPS .AND 9.8 PPG BRINE - 180 BBLS DISPLACED AT 10 BPM: 400 PSI - 210 BBLS DISPLACED AT 7 BPM: ICP 188 PSI, FCP 1256 PSI - REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 1340 PSI - 'i- BUMP PLUG AND INCREASE PRESSURE TO 1900 PSI AND HOLD FOR 5 MIN - BLEED OFF PRESSURE AND CHECK FLOATS: FLOATS ARE NOT HOLDING - TOTAL DISPLACEMENT VOLUME 450 BBLS (MEASURED BY STROKES AT 96% PUMP EFFICIENCY) - RECIPROCATED PIPE 15 FT AT SURFACE DURING DISPLACEMENT, STOPPED RECIPROCATING 340 BBLS INTO DISPLACEMENT WHEN 50 KLBS ADDITIONAL DRAG OBSERVED. - CEMENT IN PLACE AT 2:53 - 9 HRS 22 MIN TO 50 PSI COMPRESSIVE STRENGTH RUNPRD PRESSURE BACK UPON CASING TO 1900 PSI AND HOLD UNTIL CEMENT REACHES 50 PSI COMPRESSIVE STRENGTH _ - PUMP 5 BBLS TO PUT PLUG BACK IN PLACE AND PRESSURE UP TO 500 PSI OVER BUMP PRESSURE SIMOPS: INITIATE INJECT DOWN THE 13-3/8" x 9-5/8" ANNULUS: - CLOSE ANNULAR AND PUMP 4 BBLS TO 320 PSI TO INITIATE INJECTION - INITIAL INJECTION 5 BBLS - INJECT 1 BBLAFTER BREAK OVER EVERY HOUR - INJECT 20 BBLS AT 500 PSI AND 2 BPM AFTER FIRST 1 HOUR INJECTION RIG DOWN CASING RUNNING EQUIPMENT AND SEND OUT LAY DOWN STANDS OF 5" DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT LOAD PIPE SHED WITH 7" TUBING CLEAN PITS Printed 8/8/2019 11:59:01 AM •`AII depths reported in Drillers Depths** North America - ALASKA - BP Page 4 of 8 Operation Summary Report Common Well Name. PWDW3-2 FLOATS: FLOATS NOT HOLDING AFE No Event Type: COM, ONSHORE (CON) Start Date: 7/3/2019 End Date: 7/7/2019 X3-019GW-O. (2,972,563.00 ) Project: PBUSAT Site: PWDW - HOLD PRESSURE ON FLOATS UNTIL 500 PSI Rig Name/No.: PARKER 272 Spud Daterrime: 6/27/2019 12:01:OOAM Rig Release: 7/12019 Rig Contractor. PARKER DRILLING CO. HRS BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) - CONTINUE TO INJECT I BBLAFTER BREAK Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations . _—_ _(hr)_ _ (usft)-- __ -_ 12:00 - 15:00 3.00 CEMT N 6,317.00 RUNPRD BLEED OFF PRESSURE AND CHECK CASING Printed 8/8/2019 11:59:01 AM "All depths reported in Drillers Depths" FLOATS: FLOATS NOT HOLDING - REAPPLY 1500 PSI ON CASING TO PUT CEMENT IN PLACE - HOLD PRESSURE ON FLOATS UNTIL 500 PSI COMPRESSIVE STRENGHT REACHED: -20:00 HRS - CONTINUE TO INJECT I BBLAFTER BREAK OVER EVERY HOUR SIMOPS: WORK 7" TUBING IN PIPE SHED 1500 - 1800 3.00 CASING N 6.317.00 RUNPRD CONTINUE TO WAIT ON CEMENT TO ACHIEVE 500 PSI COMPRESSIVE STRENGTH FREEZE PROTECT 13-31V'x 9-5/8" ANNULUS WITH 120 RRI AOF DIFSEL TO 2010- MID - 2 BPM, 1000 PSI - LEAVE 650 PSI ON ANNULUS - TOTAL 9.7 PPG -SND INJECTED PRIOR TO ;FREEZE PROTECT -40 BBLS SIMOPS: !-WORK7" TUBI NG IN PIPE SHED 1800 - 2000 2.00 CEMT N 6,317.00 RUNPRD CONTINUE TO WAIT ON CEMENT TOACHIEVE 500 PSI COMPRESSIVE STRENGTH WORK 7" TUBING -IN -PIPE SHED 20:00 - 20.30 0.50 CEMT N 6,317.00 RUNPRD BLEED OFF PRESSURE AND CHECK CASING FLOATS: FLOATS HOLDING RIG DOWN CEMENT LINES ON RIG_ FLOOR 20:30 - 00:00 3.50 CEMT N 6,317.00 RUNPRD BLEED OFF PRESSURE ON ANNULUS TO OPEN ANNULAR AND RIG DOWN LANDING JOINT - OBSERVE MORE FLOW THAN EXPECTED - CLOSE ANNULAR AFTER 10 BBLS RETURNED AND MONITOR PRESSURE BUILD UP - NOTIFY WOS AND ODE OF SITUATION - PRESSURE BUILT UP TO 130 PSI OVER 1 HOUR PERIOD PERFORM SEVERAL CONTROLLED BLEEDS TO FINGERPRINT WELL FIRST BLEED. - BLEED OFF 2 BBLS OVER 2.5 MIN AND CLOSE CHOKE - PRESSURE BUILT UP TO 123 PSI OVER 25 MIN SECOND BLEED: - BLEED OFF 2 BBLS OVER 3.5 MIN AND CLOSE CHOKE - PRESSURE BUILT UP TO 120 PSI OVER 25 MIN DISCUSSED BLEED RESULTS WITH WOS AND ODE Printed 8/8/2019 11:59:01 AM "All depths reported in Drillers Depths" Common Well Name. PWDW3-2 Event Type. COM- ONSHORE (CON) Project: PBUSAT Rig Name/No.: PARKER 272 Rig Contractor: PARKER DRILLING Active datum: ACTUAL KB - P272 @N Date From - To 7/6/2019 00:00 - 05:30 North America - ALASKA - BP Operation Summary Report Page 5 of 8 AFE No Start Date: 7/3/2019 End Date: 77/2019 X3-019GW-C: (2,972,563.00 ) Site: PWDW Dust: (above Mean Sea Level) His Task Code (hr) 5.50 CEMT N 05:30 - 09:30 4.00 CEMT N 7/7/2019 BPUOI: 500292363400 NPT Total Depth Phase Description of Operations (usft) 6,317.00 RUNPRD CONTINUE TO FINGERPRINT WELLAND TROUBLESHOOT PRESSURE ON 13-3/8" x 9-518" ANNULUS THIRD BLEED: - BLEED OFF 10 BBLS OVER 11 MIN AND CLOSE CHOKE - PRESSURE BUILT UP TO 125 PSI OVER 35 MIN DISCUSS RESULTS WITH WOS, ODE AND WOM AND DEVELOP A PLAN FORWARD CONTINUE TO MONITOR PRESSURE ON ANNULUS: 155 PSI AT 04:30 HRS BLED BACKATOTAL OF 24 BBLS OF DIESEL WAIT ON MUD PLANT TO BUILD 120 BBLS OF 9.8 PPG BRINE SIMOPS: - LOAD 4" DRILL PIPE IN PIPE SHED FOR L3 -22B _ 6,317.00 RUNPRD PUMP 130 BELS OF 9.8 PPG BRINE IN THE 13-3/8" x 9-5/8" ANNULUS - STAGE UP TO BPM, OBSERVE BREAK 'OVER AT 1030 PSI '- CONTINUE TO PUMP AT 4 BPM, 800-850 PSI '- SHUT DOWN PUMPSAND LINE UP TO CHOKE TO MONITOR PRESSURES -INITIALANNULUS PRESSURE AFTER PUMPING = 630 PSI - ANNULUS PRESSURE DECREASED 70215 PSI AFTER 1.5 HRS DISCUSS WITH ODE, WOS AND WOM. GET APPROVAL TO PERFORM CONTROLLED BLEEDS AND OBSERVE PRESSURES FIRST BLEED: - BLEED OFF 2 BELS OVER 5 MIN - INITAL PRESSURE: 214 PSI -PRESSUREAT END OF BLEED: 15 PSI - CLOSE CHOKE AND MONITOR: ANNULUS PRESSURE AFTER 10 MIN = 106 PSI SECOND BLEED: - BLEED OFF 2 BBLS OVER 9 MIN - INITAL PRESSURE: 106 PSI - PRESSURE AT END OF BLEED: 14 PSI - CLOSE CHOKE AND MONITOR: ANNULUS PRESSUREAFTER 10 MIN = 100 PSI SIMOPS: - TURN TIRES AND INSTALL TIE -RODS FOR RIG MOVE - RIG UP FOR CASING TEST Printed 8/13/2019 11:59:01AM **All depths reported in Drillers Depths** Comma- Well Name. PWOW3-2 Event Type: COM- ONSHORE (CON) Project: PBUSAT Rig Name/No.: PARKER 272 North America -ALASKA - BP Operation Summary Report Start Date. 7/3/2019 End Date. 7!7/2019 Site: PWDW Spud Date7Time: 6/27/2019 12:01:OOAM Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Date From - To Hrs Task (hr) 09:30 - 10:30 1.00 CASING 10.30 - 13'.00 2.50 CASING Page 6 of 8 AFE No X3-019GW-C:(2,972,563,00) Rig Release: 7/72019 BPUOI: 500292363400 Cade NPT Total Depth MONIT R' ANN Phase Description of Operations (usft) P 6,317.00 RUNPRD PRESSURETEST 9-5/8"CASING 7O 4000 PSI FOR 30 CHARTED MIN - PUMP 6.7 BELS TO PRESSURE UP, BLED BACK 6.7 BELS AFTER TEST - LOST 45 PSI IN THE FIRST 15 MIN - LOST S PSI IN THE SECOND 15 MIN - TEST MET CRITERIA PER BP PRACTICE 100218 - WOS APPROVED PRESSURE TEST P 6.317.00 RUNPRD RIG UP HALLIBURTON E -LINE TO PERFORM CBL ON 9-5/8" CASING - MOBILIZE E -LINE SHEAVES AND LOGGING TOOLS TO RIG FLOOR - RIG UP SHEAVES AND MAKE UP LOGGING TOOLS SIMOPS: CONTINUE TO PERFORM CONTROLLED BLEEDS AND OBSERVE PRESSURES ON 13-3/8" x 9-5/8" ANNULUS THIRD BLEED: - BLEED OFF 2 BBLS OVER B MIN -INITAL PRESSURE: 109 PSI '- PRESSURE AT END OF BLEED: 14 PSI - CLOSE CHOKE AND MONITOR: ANNULUS PRESSURE AFTER 10 MIN = 95 PSI i FOURTH BLEED: - BLEED OFF 2 BBLS OVER 15 MIN - INITAL PRESSURE: 96 PSI - PRESSURE AT END OF BLEED: 14 PSI - CLOSE CHOKE AND MONITOR: ANNULUS PRESSURE AFTER 15 MIN = 92 PSI FIFTH BLEED: - BLEED OFF 2 BBLS OVER 15 MIN - INITAL PRESSURE: 92 PSI - PRESSURE AT END OF BLEED: 14 PSI CLOSE CHOKE AND O . ULUS PRESSURE AFTER 30 MIN = 90 PSI 13:00 - 18:30 5.50 CASING P 6,317.00 RUNPRD PERFORM CBL ON 9-5/8" CASING FROM 8214' MD TO SURFACE - SEND LOGS TO PETROPHVSICIST FOR INTERPRETATION SIMOPS: CONTINUE TO PERFORM CONTROLLED BLEEDS AND OBSERVE PRESSURES ON 13-3/8" x 9-5/8" ANNULUS SIXTH BLEED: - BLEED OFF 1.8 BBLS OVER 31 MIN - INITAL PRESSURE: 90 PSI PRESSURE AT END OF BLEED: 14 PSI -CLOSE CHOKE AND MONITOR: ANNULUS PRESSURE AFTER 50 MIN = 77 PSI SEVENTH AND FINAL BLEED - BLEED OFF 1.8 BBLS OVER 5 HOURS - INITIAL PRESSURE: 77 PSI Printed 8/8/2019 11:59:01AM **All depths reported in Drillers Depths** 19:00 - 20:00 20:00 - 00:00 1.00 4.00 7(//2019 00:00 - 00:30 0.50 00:30 - 08:00 7.50 North America - ALASKA - BP Page 7 of 8 COMPLETE FINAL BLEED ON ANNULUS. Operation Summary Report FLOW STOPPED AFTER - 5.5 HRS Common Well Name: PWDW3-2 _ - - - — _--- AFE No Event Type: COM -ONSHORE (CON) Start Date: 7/3/2019 End Date: 7/7/2019 X3-019GW-C: (2,972,563,00) Project PBUSAT Site: PWDW WHSUR P 6,317.00 Rig Name/No.: PARKER 272 Spud Date/Time: 6/27/2019 lZ01.00AM Rig Release: 7/7/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: 500292363400 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations —(hr) (usft) 18:30 - 19:00 0.50 CASING P 8,317.00 RUNPRD RIG DOWN HALLIBURTON E -LINE UNIT 19:00 - 20:00 20:00 - 00:00 1.00 4.00 7(//2019 00:00 - 00:30 0.50 00:30 - 08:00 7.50 Printed 8/8/2019 11:59:01AM **All depths reported in Drillers Depths" SIMOPS: COMPLETE FINAL BLEED ON ANNULUS. FLOW STOPPED AFTER - 5.5 HRS DISCUSSED WITH WOS AND OPENED ANNULAR CASING P 6,317.00 RUNPRD RIG DOWN VOLANT _ _ BACK OUTAND LAY DOWN LANDING JO INT WHSUR P 6,317.00 RUNPRD INSTALLAND TEST 9-5/8"CASING PACK -OFF PER FMC REPRESENTATIVE '- MAKE UP RUNNING TOOLAND PACK -OFF ON RIG FLOOR - DRAIN STACKAND MONITOR OPEN OA VALVE -INSTALL PACK -OFF AND RUN IN LOCK ,DOWN SCREWS - PRESSURE TEST PACK -OFF TO 4000 PSI FOR 15 MIN: GOOD TEST - WOS APPROVED 9-5/8" PACK -OFF PRESSURE TEST RECEIVED APPROVAL FROM AOGCC TO . Gnr. T u F rnncpl FTION OPERATIONS 4ETEa RFVIFWOF THE CBL ON THE 9-5/8" CASINGAT 22 18 HRS SIMOPS: - MOBILIZE HANDLING EQUIPMENTAND TONGS TO RIG FLOOR FOR 7" x 5-1/2" COMPLETION - ORGANIZE COMPLETION EQUIPMENT IN PIPESHED RUNCOM P 6,317.00 RUNCMP RIG UP TO RUN COMPLETION - RIG UP DOYON CASING TONGS AND TORQUE TURN EQUIPMENT WBS: RUNCMP RUNCOM P 6,317.00 _ RUNCMP RUN 7" x 5-1/2" VTHC COMPLETION TO 4462' MD - BAKERLOK ALL CONNECTIONS BELOW THE PACKER - USE JET -LUBE SEAL GUARD PIPE DOPE ON ALL NON-BAKERLOK'ED CONNECTIONS -TORQUE 5-117 CONNECTIONS TO 6580 FT -LBS - TORQUE 7" CONNECTIONS TO 11950 FT -LBS - RUN IN THE HOLE AT 90 FT/MIN - MUD WEIGHT IN/OUT = 9.8 PPG - MONITOR WELL WITH TRIP TANK: GOOD DISPLACEMENT - PU 138 KLBS, SO 125 kLBS Printed 8/8/2019 11:59:01AM **All depths reported in Drillers Depths" Common Well Name: PWDW3-2 Event Type: COM- ONSHORE (CON) Project: PBUSAT Rig Name/No.: PARKER 272 North America - ALASKA - BP Operation Summary Report Start Date: 7/3/2019 Site: PWDW Spud Dater ime: 627/2019 Active datum: ACTUAL KB - P272 @85.79usft (above Mean Sea Level) Date From - To Hrs Task Code NPT _ (hr) 08:00 - 09:30 1.50 - RUNCOM P 09:30 - 11:30 2.00 11:30 - 13:30 13:30 - 17:00 2.00 BOPSUR P WHSUR P 3.50 WHSUR 117:00 - 17:30 0.50 WHSUR Printed 8/82019 P P AFE No End Date: 777/2019 X3-019GW-C:(2,972,563.00) M Rig Release: 7!72019 BPUOI: 500292363400 Page 8 of 8 Total Depth Phase Description of Operations (usft) 6,317.00 RUNCMP MAKE UP TUBING HANGER AND LAND 7" z 5-1/2" COMPLETION PER FMC -PUMP OUT STACK - MAKE UP LANDING JOINT AND XO FOR i HANGER - INSTALL J -PLUG IN TUBING HANGER ON RIG FLOOR MAKE UP LANDING JOINT TO HANGER — MAKE UP HANGER TO COMPLETION AND OPEN IA '- LAND HANGER IN TUBING SPOOLAND RUN IN LOCK DOWN SCREWS - BACK OUT LANDING JOINT AND LAY DOWN - RIG DOWN CASING RUNNING EQUIPMENT SIMOPS: PREP MUD MODULE FOR RIG MOVE _ 6,317.00 RUNCMP 'NIPPLE DOWN BOP STACK AND RACK BACK ON STUMP - PULL MOUSEHOLE AND LAY DOWN TO PIPE 'SHED ' - REMOVE CIRCULATING LINES AND TURNBUCKLES FROM STACK NIPPLE DOWN STACKAND SECURE ON STUMP - NIPPLE DOWN HIGH PRESSURE RISERS AND LAY DOWN TO PIPE SHED - INSTALL PLUGS IN FLOW LINE AND FLOW BOX 6,317.00 RUNCMP PREP WELLHEAD FOR ADAPTER FLANGE AND TREE -CLEAN AND INSPECT TUBING HANGER PROFILE PER FMC SIMOPS: - RIG DOWN INNERCONNECTS AND PREP MODULE FOR MOVE - RIG DOWN RIG FLOOR EQUIPMENTAND _ PREP FOR RIG MOVE 6,317.00 RUNCMP NIPPLE UP TREEAND ADAPTER FLANGE AND TEST - NIPPLE UP ADAPTER FLANGE AND TREE - PRESSURE TEST HANGER VOID TO 4500 PSI: GOOD TEST -ACTING WSUP APPROVED HANGER VOID PRESSURE TEST - PRESSURE TEST TREE TO 4500 PSI LEAK -TIGHT: GOOD TEST SIMOPS: - CONTINUE GENERAL RIG DOWN OPERATIONS THROUGHOUT RIG - BRIDLE UP BLOCKS - DISCONNECT MUD AND CEMENT LINES TO RIG FLOOR SKID RIG FLOOR TO RIG MOVE POSITION 6,317,00 RUNCMP CLEAN AND SECURE TREE AND CELLAR SIMOPOS: - LOWER MAST ON TO RACK: 361 KLBS RELEASE RIG AT 17:30 HRS 11:59:01AM **All depths reported in Drillers Depths** Daily Report of Well Operations PBU PWDW3-2 T/I/O=TWC/0/0. Post Parker RD temp valves #33, #71, #110. Installed new CIW 6" upper tree with SH 3000 SSV barrel. Torqued to API specs. 1191 FT/LBS. ***JOB IN PROGRESS"**. See log for 7/8/2019 details. Final WHP's TWC/0/0. T/I/O=TWC/0/0 R/U lubricator, PT'd tree through lubricator against TWC 300/low..5000/high.. pass. see "Field Charted Tests" Pulled 6" CIW "J" TWC #401 through tree. Shut barriers, R/D lubricator, 7/9/2019 PT'd tree cap 500 psi. FWP's 0/0/0 see log for details. T/1/0=vac/7/83 Temp = S/I ( LRS Unit 70 Circ Out Well and Set Packer) Heated (Rolled) diesel tanker from 50*F to 90*F. Pumped 5 bbls 50/50 meth spear down IA. ***WSR continued on 07-11- 7/10/2019 19*** ***WSR continued from 07-10-19*** ( LRS Unit 70 Circ Out Well and Set Packer) Pumped 5 bbls 50/50 meth/water spear, 290 bbis 122*F 2% kcl to warm up well, 90 bbls 120*F Corrosion Inhibited 2% kcl, down IA, up TBG, taking returns to open top tank. Pumped 2.28 bbls diesel down OA to diagnose possible communication issues between IA/OA (see log for details) continued with pump schedule. Pumped 90 bbls 115* corrosion inhibited 2% kcl down IA. Pumped 160 bbls 80*F diesel down IA. Freeze protected TxIA by U -tubing with reverse out skid for 1 hour. Freeze protected hardline to tanks with diesel. CMIT TxIA= PASSED to 2645/2676 psi. Pumped 4.7 bbls of 70* F Diesel to reach Max Applied Pressure. 1 st 15 min TxIA lost 72/73 psi, 2nd 15 min TxIA lost 37/35 psi. TxIA last 109/108 psi for a 30 min test. Bled back -4.2 bbls. MIT -T= PASSED to 3253 psi. Pumped 2.7 bbls of 70* F Diesel to reach Max Applied Pressure. 1st 15 min TBG lost 123 psi, 2nd 15 min TBG lost 47 psi. TBG lost 170 psi for a 30 min test. Bled back -1.7 bbls. MIT -IA = PASSED to 3210 psi. Pumped 2.4 bbls of 70* F Diesel to reach Max Applied Pressure. 1st 15 min IA lost 84 psi, 2nd 15 min IA lost 30 psi. IA lost 114 psi for a 30 min test. bled back -2.4 bbls. FWHP'S= VACNACNAC SV,WV,SSV= Closed MV,IA,OA= Open All hardline block valves 7/11/2019 and gate valves= Closed ***WELL S/I UPON ARRIVAL*** (new well post) PULLED B&R AND RHC PLUG BODY FROM 4,457' SLM RAN 10'x 3 3/8" DUMMY GUN (3.65" rings), TEL, 2 1/2" SAMPLE BAILER. --LOC TT @ 4,473' SLM. TAG HARD TO @ 6,191' SLM (wet cement) ***WELL LEFT S/I UPON DEPARTURE, FS3 NOTIFIED OF WELL STATUS UPON 7/12/2019 DEPARTURE*** —WELL SHUT IN ON ARRIVAL*** RIH W/ GAMMA/CCL PERFORM JEWELRY LOG FROM 6150' TO 4000'. LOGGED TT @ 4502' ELMD. 7/13/2019 ***CONTINUE ON 14-JUL-19 WSR*** TWO = 0/0/30. Temp = SI. Obtain sample (eval fluid in cellar). Cellar has –2" of clear fluid throughout. Circ ports are open w/ standing clear fluid level with the bottom lip of the circ port opening. Took sample from the cellar floor. 7/14/2019 HES E -line in control of valves upon departure. 08:30 ***CONTINUE FROM 13-JUL-19 WSR*** PERFORATE 5772'- 5793' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5751' - 5772' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5730'- 5751' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5637'- 5658' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5626'- 5637' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5559'- 5580' WITH 3-1/8" MILLENNIUM HMX, 6 SPF, 60 DEG PHASING ALL LOGS CORRELATED TO HES RCBL DATED 06-JUL-19 7/14/2019 ***CONTINUE ON 15-JUL-19 WSR *** Daily Report of Well Operations PBU PWDW3-2 ***CONTINUE FROM 14-JUL-19 WSR PERFORATE 5548'- 5559' WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5457'- 5478' WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5446'- 5457' WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5423'- 5402'WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5402'- 5381' WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING PERFORATE 5360'- 5381' WITH 3-1/8" MILLENIUM HMX, 6 SPF, 60 DEG PHASING ALL LOGS CORRELTAED TO HES RCBL DATED 06-JUL-19 RIH W/ TTTCU,HAU,QPC, CTF AND PERFORM SBHPS PER PROGRAM 7/15/2019 ***CONTINUE ON 16-JUL-19 WSR*** '*CONTINUE FROM 7-15-19 WSR*** RIGDOWN HES ELINE UNIT 4863 7/16/2019 `*'WELL S/I ON DEPARTURE, DSO NOTIFIED' FLOW STATION 3 LEGEND: AS—BUILT CONDUCTOR • EXISTING CONDUCTOR FS3 GRAPHIC SCALE 0 175 350 700 ( IN FEET ) 1 inch - 350 1L NOTES: 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. (EPSQ 26734) 2. BASIS OF VERTICAL CONTROL IS FS3. 2018 WELL BORE SUBSIDENCE STUDY HOLDING PBS11140A (ELEV.41.421 3. VERTICAL DATUM IS BPXA MLLW. 4. GEODETIC PORTIONS ARE NAD27. (EPSQ 4257) S BEARINGS AND DISTANCES SHOWN ARE ALASKA STATE PLANE GRID & FLOW STATION 3 AVERAGE SCALE FACTOR IS 0.9999353 7. DATE OF SURVEY. MAY 25, 2019. & REFERENCE FIELD BOOK: NS19-11 PP. 18-21. 9. COMPUTED RELATIVE ACCURACY (THIRD ORDER): BASELINE DISTANCE 1:13,610 BASELINE AZIMUTH: N/A ALLOWABLE VERTICAL CLOSURE 30.D1'; FOUND: 0.00' 10. NAD27 COORDINATES DERIVED USING TRIMBLE BUSINESS CENTER—HCE VER 3.92. 1. , .:.0 10200 SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MAY 25, 2019. BASIS OF COORDINATES: HELD COORDINATES OF RECORD FLOW STATION 3 MONUMENT 38 Y- 5,944.140.85 N- 4,515.20 X- 676,342.56 E— (—)5,904.64 NA027, ASP, ZONE 4 FS3 PLANT DESCRIPTION: OPERATOR MONUMENT 250'3 S, /00'1 W. OF S.W. CORNER MOD 4934. STEEL PLATE 1.18' ABOVE GRADE WITHIN PROTRACTED SECTION 3, T. 10 N., R. 14 E., UMIAT MERIDIAN, ALASKA NO. COORDINATES COORDINATES POSITION DMS POSITION D.DD OFFSETS IFLANGL LL. PWDw3-2 Y= 5,945,289.13 N= 5,545.30 70'15'21.920" 70.2560889' 4,912' FSL 39.1' 39.0' N/A X= 676,721.14 E= —5,271.43 14834'18.120" 148.5717000' 4,873' FEL DRAPER b bell �AS6 p F'�" FS3 m EOA FLOW STATION 3 C0"A AEOCS82 AS—BUILT CONDUCTOR en • n•r Ul• 1 1 ro 7 mum Em uaoautXn mw naouz iiA•u nem 1.350. WELL PWDW3-2 rro. WT[ Rn+snx er aX tle0 m�T Q � J Q 0 Q 0 V .0 � N M 0 E Q 0 V 0 M ''/�^� v+ L y m D O O o N Z a(La.a.� o LL z 3 s o z 3: .- O m O N m W O N o m n Q a g s s U p n n J J y5� w > 9 C y � ° ' m U b m p1 y � C a O N 9 U r LL LL' b t i a I o voi o `O 'v e Y � > O T > > 0 m m m O m e o m tU N O O Y O1 `b m r iO O h N n A N V c N 6 IL m Z n � b m � � c ei p Q C b O Z W N C L m A d c i w A o ? � o r U m a m N m N • .N.. n F v b w W b n A C O 'm o rm a E m m w w o 0 o S a N d d o o o zA c�7 0 u z0 p m a a a c a N N N N A N N 2 f° gggg=w az za aaaa � Z' a A C C O b C d Q W Q .O-. n o a c N?= u o O O M N m N YrI W Ih � N m n N m 1l1 N T P O O O O O' NNT ' 0 t > b- o m W m m N N m a r m m m b w 0 o m 0 N m a m Q m m m o b Q N m C f S N N N O n O N m O b P P m N N Q Ont W N O W P N O O � Oni N N N N N N N N N N N NN N N w N N N N N NN 01 I� Y 0 O 0 N O W a a a ¢ W q 'J ._. N tn0 m N m N Ino 0 nm m b b b m tn0 tn0 Ino m tn0 N W N N P N V Omi m N Obi mN m O N N 0 N n M W to b b b T la n n n b m O P m N n N m n p w C N b N m N m N m N m N m N m N b N m N m N m N W N W N b N O M O m N N w N (7 N N t C N 'N 'A p m Q Yf P m p VI p N P@ N b P N P N P N P N P UI P N P N P N P N IN P@ L+ V m m pi pl OI OI W W W W W w w. W W W W W 2 2 2 m Yl N Ul IA . m Y) N m m b m b N b m m m b m 00 O_O>_> m Cp Cp O O N P n W N b n W Cl n b P m m n n C� O13 5 C w + t � v tt rc O d LL_ LL_ 3+ i p0 n m N n b m N N m O w O O N P b N a 022 ym ¢ ¢ U pU 3i g E O O W n N N N N O N O N O N O N W N b N N Q O N C 1m 1N @@ 10 P Ip NW V y + i E >O' LL LL m N N m m Q N m m m n n m W W Z O+ i O M O 0 ° (D 2 E W o 0 0 0 o m m m@ W N P n o 0 0 0 o m m m w o o Iv w m m@ N N m b O o 0 0 o W W W m N m b n n N m N N N M M P b b m n n m m m W N N N O W w m O m n m W m r N m@ W Ol O W P O O N Q H m CI w w w N N I7 N N pp pSp pp a a a ¢ W PS G rt N Z Z Z Z M b fA N O@ m@ w P w m b N w r O m m p O O O . O O O O O O O O N w N m m n m W W o m 6 n f = lh m E tWf d O C T Z v a m 3 3 o h 0o m n o 0 0 0 0 0 0 0 0 W m P a m m W m 0 O it h W W (O 0 b W 0 N M h 0 M h b N P Q P M fp O m M Q M h Q P w (p ` O N N a w N M O m b N W Q N 0 h m b 0 b b 0 O W W M m M O N P 0 h 0 N P 0 0 O P N O h M P M m Q b W W Q b a Z m m p N N d a d N D• d W �p N W M h F b N 0 N 0 0 0 W b h 0 M 0 0 0 P 0 N � O m m O a W 0 m 0 P h M b 0 0 0 6 F h N O w b M N m P y y U Cl N 1� O P 0 0 6 0 r N N M 01 O m P m N t0 r N m iY Q Q E N C No w 0 m m VW p b M b M b N b m w b 0 i(1 m b b N M b YI O YI W P b P b Q P P M P N P Q m M � m ro im' ro ro .o m m ro ro q r W b b thO m m m m b b b 0 0 0 b b 0 0 m 0 0h 0 IhD 0 0 0 0 Q Q F W m N M OP m N M Q NP m fh0 N O N h Q N P Q O 0 p VI h P m W f0 M M P M M 0 b m 0 P N 0 N N O O b m 0 m O WN CW'1 t0 0 0 N O 0 M 0 N 0 0 Q h m N N h 0 h y m W Q 0 N h 0 W MM W O N 0 M 0 h m O M p b . 0 0 0 0 0 m NN C O i Y M N M M M M M P Q N P N P Q Q N P N O 0 VI b Yf 0 N N 0 0 0 0 0 L L E m N m N m N m N N � N P Y P N P N Q N P N P Yl P b P N P N b � N � N �i N � N Q N Q N Ifl wP W W m W W W m w N M b b W N N N VI b N N N N N N N N N N N N N b b b Y1 dQ C d V A 9 C C U N 0 N m wh Q d 00 N ul M N 0 10i P m Q 0 h O 0 P N V M h uPl n N y m O W (O 0 N m 0 N Q m O 0 W q M (m0 b O r P O� d d U p U d R' T d l7 P b (O (O 0 0 W O M P 0 W W N N N N N N N m l7 u C Z 3 m i> C O d h P N M m M N N Q 0 M p O h b 0 Q M M VI M h O CI M r N b O M b N 0 � 0 r p p O h 0 V 6 CS h o b Q m P W 0 P O N 0 w Q W O 0 W' N M M N 0 � m 0 N N N N Q N 0 N h N 0 N 0 N 0 M M N M tQ'1 M p0 {+I ` m LL M M b w M N O W N b w M h h w N O N m h P W W O h O W b P O W O O N M M 0 Q P 0 h w^ 0 W N M O N !O W h h b b N Q Q M N N O W m M h m w O N M P N 0 h 0 m O N M M P 0 0 h 0 W O O N M O+ - - - - - - - - - N N N N tV N N N N lV N Cl m (7 m Cf m d >O d F ` h O M Q W b h N M P N w h W W O N M Q b w h 0 m O N N M P N N N N N N N N N N N M M M M M M M h h M N W CO h co h 0 b M P Q h I(1 M N O 0 M m b W h 0 Q 0 M M w fO P O P b 0 f0 O h W W O 0 W O H O m W a m g b N p OJ !p N N Y b M N M m O m pp b N 0 N O N h O P p O U Z d 0 O 00 n 0 N m m M N h 0 N N m 0 w b N m O P VI W Oi O YI pi b V1 m 0 P Y b m OI N W h Q P N O O M P w O b O fD 10 b P h Q W m W m O ' N N M O P O b W 0 m 0 W h 0 0 h m h O m O N O M N M Y O 0 N d O C T m U 4 N Ti i 0 0 �V io N m m Q m O o m n ry a m m w � m epi m Q w N n m m m m O O m l7 m OI p fC m N m m W N N m at y Q' m � mW r Nl 0 N p Q O m m r N W w O ill N N P m b m r W 0 O p Q O p m m m Vl YI m m m m� m b m r n n r r r m m m m m m N � V m 4) h Em m m r W n p N b r m f m O w m r O m m b O m O O m Q U 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 o c o 0 0 0 0 0 0 U 2 w w Q M U N N d a N N O N m m m m a or m N m m m n w N m n m o o m v m m o m m m m w n m n W m N m w n n W m W m C y y U N N W b m O m b N O r y N w m m N m at m m W n N m ?) Q Q E b C m m m m m m m N N N N WO mO r O mO CL Q Q f 2 W w 0 m 0 m m N b w N m m W r Q m O O r m r m m m m m n m r N m r N N P n m r m m m W m m m N 0 O m m O m n O Q O m m m m O W W n N m m Q b r m m O N Y y w m p b b r m O N m 4 m m n m w O N m P b r m w O L O N c m C m m W m m b n N n n n r r r N n n n m m m m m m m m m w w L T m N N N N Np N P p N p N Q N p N Q N �i � m Q m Q m Q b P b m m N P N m N 0 N N N In W m W 01 W W W W W w w w W OQi C b N N b m m N m b m m m b m m N b b m m m b m m m b m d d 3 E C U d d L O N ul Q P O bm Q O m' b m m Q m m m p W N m O m Q r O m W m N p N W Q W W m m m N P d� A h O m b m O m m m O N N n w N m m r w m m n Wm Cl Q m m m m 10 1?(9 (p 9 o �L Z m O r P O W m N Of m N a O m m m r W O m N m W m m N P W m m m m m m p p p Q Q V Q O Q W m h N b Vml N N m fO0 m d N IL d m m z a� m m W m N t0 O N m w N VI Oi N Yf m Q 0 � r O 4 r O Q ` W t7 (O m V b b b m m r p m m W m' O N m O Q w Q N m m r n r m app w b O ' O N m m m P N m W O r O m W m d O+ ❑ d I•: m P m b m m r m r p m Q t� m O m b m b Q Q N n P` n m W n W n W m W m N Q Q Q n N m m p m n m w P V N b at N t0 N m m P I� O Q tU di t7 fp O Ol (p O m N N ON m m p m m r m W O N m p m m r r m W W N m W b m m b W 10 m m N N N N N N w r m W N W 10 m m m m m m N m m W wO W0 O O O G C O Oj m p (•l O l7 Ol O l2 Ol Q N Q a m �I' b m n m n n a m m o N m w o a m n n a m m N Q m N g o 0 b o W o 0 o m o 0 o m m r m W W o 0 0 0 0 0 0 G o 0 0 0 of o 0 0 0 0 0 0 of of ai of of di 0 0 0 0 o a o 0 � u d N N N C E o 0 0 0 r m o m W N m m N W N r N b n n N W W W b n g m N m m W W n n Q N m m W m w N N m m m N W m b b n p W m m N m n n' m m m t0 m m b y 0 Q Q m W N m N n N n O N O m W N m m 0 N n w m Q m O Q �D m n m W O N m p m N r m w O � N m P P m W r m W O N m� n or m m m P 4 4 Q p p p Q Q aj Yf W V) N m U) N N N h N tp R t�a`w3 30 h r 0 C t pE ,@" U d F) $ S O m m a N m N Q Q m m m m N � N V N 0 0 o a m � w O m b O m m m ry 7 10 b m m W O o) C1 O Q r m m m m N oI m Q c m m m m C C N m N N e= m m m m 2 h b b b n m m m m m n Q ri n ro - m m m r m m b m 4 N n m m h N N m m n b m m O Q m o o b m b O O b m m r b m n O N Q m m b (0 m N Q b b m n r a m m m of ai a m 0 m mmm s N Q Q O C vmi mi n r O S a a O co m O n a L "oma by North America - ALASKA - BP PBUSAT PWDW PWDW3-2 PWDW3-2 500292363400 AOGCC Offset Well Report 24 July, 2019 Company: North America -ALASKA - BP Project: PBUSAT Reference Site: PWDW Site Error: 0,00usft Reference Well: PWDW3-2 Well Error: D00usft Reference Wellbore PWDW3-2 Reference Design: PWDW3-2 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well PWDW3-2 ACTUAL KB - P272 85.79usft ACTUAL KB - P272 85.79usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference PWDW3-2 Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 7/24/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description i 50.00 848.53 Survey #1 (PWDW3-2) GYRO -WD -SS Gyro while drilling single shots 884.81 3,204.44 Survey#2(PWDW3-2) MWD+IFR+MS-WOCA MIND +IFR+Multi Station W/O Crustal 3,301.50 8,317.00 Survey#3(PWDW3-2) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Site Name Offset Well - Wellbore - Design E% PW -3-1 PWDW3-I-PWDW3-I-PWDW3-1 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 2,750.13 2,800.00 499.99 712412019 1:41:32PM Page 2 of 2 COMPASS 5000.1 Build 81D } | k § a: E . ■k�2{§ l;2a!!I �E/..! )« \ k i` \} } /{ : 7f/; § k(} /§k§ \ 0� ® !|Eer 2{§ kEkL§ _\ \6/ | /f !! 0 )10 COD m 0 F k £ !!f a: E . ■k�2{§ l;2a!!I �E/..! )« \ k i` \} } /{ : 7f/; § /§k§ \ 0� ® 2{§ kEkL§ _\ \6/ | /f !! 0 )10 m 0 a: E . ■k�2{§ l;2a!!I �E/..! )« \ k i` \} } /{ : 7f/; § a: E . ■k�2{§ l;2a!!I �E/..! )« i` \} } /{ : 7f/; § /§k§ a: E . ■k�2{§ l;2a!!I �E/..! )« i` \} } /{ § _\ \6/ | /f F k £ {r( «! {(. lie! ! | ) a: E . ■k�2{§ l;2a!!I �E/..! \} } /{ § a: E . ■k�2{§ l;2a!!I �E/..! a: E . ■k�2{§ l;2a!!I E!!. _\ \6/ | /f a: E . ■k�2{§ l;2a!!I E!!. a: E . ■k�2{§ l;2a!!I m N L N J O C N E O [ C LL Q L O N U LL a m a c c N m m ¢ O x n E ^ E a m n = 0 O O❑ w X X S J E m m m m O 3 O 3 m �N m U O E n 3 j n Q p 00 0 0 E I a o n n J J m m o 0 0 o m ❑ n n L° w EM a m �� UI ❑ E ❑ w o Ci m UcNE @ m d 0`n m it rc Na Y❑ Z a c O N ❑ o ry Kim < X E c n W E V F D U y Q" a d i F e a E a E c r c E o u r o - a Ca O ❑� L C J J N a J n i Val ® fi -7 w K x m N> $' ¢ E m y c f E_ E m a E } Y o- N C a l o w w m a 4 i O m E m +' SII v tZ 3 3 111333999 E E g p3j m ; EE III a E o moa 2 Q m^ V m C a r W > Z m YQ a a I,r N o a IL F a O l LL U m m^ rn m O� m❑ Cl v 0 � N n r a m p O y� M fmD � O '� m>T 1 j 3 m Z E U p N a- o a- (l v m ?� a C7 vi m of o y a a m g¢i ookm LL y Y >_ Q n O O ~ aO E o c d o c 2 LL 0 = « j m m a U i 5 H 0 [7 y a w❑ Wm w° o.LL o c_ Q O w Q LL V F N Q o a N J w` p o O a E �a N o « J E n JD Ni ❑ � Z n 31 m O n 3 o v a io a 2❑ o F W Eo d P w`2 E O W'i n LL t E U n m iN m U - } E d N'K Q K n ❑ a m 34 a s `o . ti $ . N E mg ti m U h> r r m r m ub E Q i o a �'.' 4 @ 8 N a m m m m = m 6 e LL W 0 m r d) N ❑ D O D W m CEJ f❑ a O N N m m v a` k | ; � ( =z R i/ § 2 § k _ . : § � {!«$ \kklz|^ CD \{- ) &| !)f)E E E '!)m2|� u §!& <E !!r! | \) //\\ k |�§§) /,)7!§ ;.. ■ !f||` \\)§|f% _ k | I H i �m m >> o y c �m I E Z Y y n w o J c a LL m ^o n m m c g E a O 0 m v m m y E N n c y m a m m m m m _ � I m v i o v = s v L um m % O � m = x C x m o 0 m 0 n m O i � o 0 o pC 7 g i N a e E E o 0 N n p o ¢ o m o N 0 z m p w J ? w 4 Y r. a t E _ J 2 o O o o v a m o g m m 6 41 C ym m E o W w a❑ m m Z m C U N N N K Q a _ j � pj O 6n = L O () O C H ¢ J m a Y O a ¢ m m >> w w �m a E Z Y y n w o o O c a LL O m m E E > H m c g E a O 0 y v m m y E W ❑ w W y m a m m _ .qa LL v = s v L um m % O � m = x C x C o 0 0 `n o 0 o o a o 0 N n p o ¢ o m o N 0 ul O m p w J ? Vl r. E _ J 2 o 0 o o N o 0 6 41 C ym N ym > o W w N a E _ a _ j � OE o m ti o n m t O n ❑ W W N d J o n 0 O a 0 0 0 m m m O a ¢ m m >> w w �m yl o a Y y n w o o O c WU' 0 O m m E E > H m c g E a O 0 n F y Z ❑ W ❑ w W y m a m m >> � �m yl o a > n w s W o O LL WU' 0 O n W I o ¢ ❑ m o O 0 z Z F Z ❑ W ❑ w W E .qa LL v = s v L um m m E x C x C 0 `n 0 o o � N n p o ¢ o m o N d > ul O m p J ? Vl N E _ n 2 ti E o o N o 0 6 41 C ym N ym > o W w N a a m m >> � �m yl O m xx ,@ g n U o m m o a N m >> �m O m xx ,@ N u 7 E Z Z y b O O ;goo 0 7 E Z m w w v m U n � E a n z LL Z Z C J y E N U - p. O m mrE 3a° c LL Q a ym E v IIm N n m @ W E E o I I r> n U F � till m xu m " O m a'. I L JI L o � ^ E a 0o E m m � a 'fi aLL c a` m a o n am U NI m (� m N m' m m Em J L d'N E ti M.y E E �N OLD O `om EcEE E_ E E_ N O Y ❑ Z m 11 O .6 m aw o U m ~ ❑ m,W X'I F � m H s o m o Ea, , LL E U w n a E c N I"> N ^ m n m w w v m U n � E a n z LL Z Z C J y E m,J U - p. O OU l mrE 3a° c LL Q a ym E y Y N U N n m @ W m N r> n S m JI xu m " O m ❑ ❑ JI m o � ^ E a 0o E m m � a 'fi aLL O ¢ W am U n m (� m N a m �c L` a.r L d'N W` M.y c Imim O `om EcEE E_ E E_ E 15: a 11 O .6 m a U m ~ ❑ m,W m' F � m H s o o , o x LL E n a o c N N ^ m n 6 Y Y v 3 n 0 m w J � IL N r `o mT� m d 6 o dLL m ❑ m m 3 a E_ y EL s 5 v a ❑ m z m y c a O U1Nm R' Q N C V m E m oo m o E m c I m y tg 3 W m w w v m U n � E a n z LL Z Z C J y E U - p. O OU l mrE 3a° c LL Q a ym E y Y N U O m�n.. m @ W Z r> n S m JI xu m " g ❑ ❑ JI m o � ^ E a 0o E m R z al ❑''o z 'fi aLL O ¢ W am U n m (� m N jm � n �c L` a.r Imp d'N y E n c Imim O `om U E_ E 15: a 11 O .6 m t ° Elly oIQI� ❑ m,W m' F m w w v m U n � E a n z LL Z Z C J y E U - rx mrE a p c LL Q a ym E v Q m�n.. m N m y ' ri r> n z i xu m " g � a m o � ^ E a 0o E m z z O am U n E (� m N jm � n �c L` a.r m y E n n t Fr U O a m' m fi o o , o x LL E m° c m 6 Y 0 m y n a a � N m w w v m U n � E a n z LL Z Z C J y E rx mrE a ym E a` m�n.. ' w z i z z �- � a E a 0o E m z z O am w n n E e m L y jm � n e y E n n t m 2 O a m' fi o w o x F p c 6 Y 0 m y n a a � N r `o mT� m d 6 � EL s c n o c a � m E m oo m n ^ m m C ❑ m c y tg m a W m 0 o ~ N m Q ❑ � y � V Wv a E Pa E n m E m w w v m U n � E a n z LL Z Z C J m o n 'o r O S rx n ' w z z z �- o v O C E 0o E m z z O w n n E e m L y jm o n n t m 2 O i a Z J O c 0 y n a m `o EL c o c a m c y o m E y. d Z ti U F m o U m y ❑ m� m m❑ K 0 o O d o U 2 H S K S m o n 'o r O S n w z z z �- o v O C 0o E m T Yt O e m L y jm o 2 O i a J O y n a m MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To: Jim ReDATE: Wednesday, July 31, 2019 gg PJ. Supervisor �Q ` I Zl (�� SUBJECT: Mechanical Integrity Tests BP Exploration (Alaska) Inc. PWDW3-2 FROM: Brian Bixby PRUDHOE BAY UNIT PWDW3.2 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry ' gpp — NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT PWDW3-2 API Well Number 50-029-23634-00-00 Inspector Name: Brian Bixby Permit Number: 219-081-0 Inspection Date: 7/27/2019 - Insp Num: mi[BD6190727103656 Rel Insp Num: Packer Depth Pretest Initial I5 Min 30 Min 45 Min 60 Min Well PwDw3-z Typelnj w Typ 4324 Tubing 3iv zi 3x1 • 13x1 — PTD 2190810 ITYpe Test SPT Test psi 1500 IA 475 3245 - 3189 - 3180 BBL Pumped: 2.1 BBL Returned: 1.4 OA 82 421 - 384 - 364 Interval rNITAL P/F P Notes: Wednesday, July 31, 2019 Page 1 of I Regg, James B (CED)��� From: AK, GWO Projects Well Integrity<AKDCProjectsWelllntegrityEngineer@bp.com> Sent: Monday, August 5, 2019 4:17 PM To: Regg, James B (CED); Wallace, Chris D (CED); Brooks, Phoebe L (CED) Cc: AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Engineer; AK, GWO Projects Well Integrity Subject: BPXA July 2019 MIT Forms Attachments: MIT PBU July 2019.zip W1 Attached are the completed AOGCC MIT forms for tests performed by BP in July of 2019. Well: PTD: Notes: 1-3-22 1861750 MIT -T and CMIT-TxIA pre rig sidetrack to A bore. Sundry 318-045, now PTD 2190510 post ST. L-103 2021390 4 Year MIT -IA L-117 2011670 4 Year MIT -IA L-04 2061200 4 Year MIT -IA M-28 1860740 4 Year MIT -IA 132-29 1931470 4 Year MIT -IA 132-34 1950660 2 Year MIT -IA, Monobore PSI -09 2021240 MIT -T and MIT -IA for IA cement squeeze, sundry 319-234, MIT -IA post repair on injection PWDW3-2 2190810 Two pre injection MIT-IAs, one initial post injection MIT -IA V-100 2010590 4 Year MIT -IA Y-27 1900280 4 Year MIT -IA Ryan Hayes (Alt. Josh Prowant) Well Operations Specialist - Integrity BP Exploration (Alaska) Inc. PBOC — A212 Office: (907) 659-5297 / 5766 Cell: (206) 999-6347 Harmony — 2468 WO oaen .,.n, o.wNuwo 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit tot 'im.reaaAalaskaoovAOGCC.Inspectorslalilaskaril phoebebrook tlootaka gov OPERATOR: BP Exploration (Alaska) Inc. FIELD/UNIT/PAD: Prudhoe l GPB/PWDW3 DATE: 07/11/19 OPERATOR REP: AOGCC REP: .1rds wallacellitalaska al 217 /4-011 Well PWDW3-2 INTERVAL Code. Pressures: Pretest Initial 15 Min. 30 Min, 45 Min. BO Min. q=Four Year Cycle F=Fail PTD 2190810 Type Inj N Tubing 1500 - 1959 195fi 1958 ' N=Not injecting Type Test P Packer ND 4324 BBL Pump 2.4 IA 147 32101 3126 309fi Interval O Test Psi 1500 . BBL Return 2.4 - OA 21 357 3W 274- Result P Notes: Post packer setting MIT -IA on grassroots well. No witness requested. Will conduct Initial AOGCC MIT -IA post POI. ✓ Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBI -Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj 4 Tubing Type Test Packer TVD BBLPump IA I Interval Test psi BBL Return OA Result Notes: Well Pressures. Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type lnl Tubing Type Test Packer TVD BBLPump IAInterval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min, 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Indal 15 Min, 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Typa Test Packer WD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBLPump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min 45 Min. 60 Min. PTD Typelnj Tubing Type Test Packer WD BBL Pump IA Interval Test psi BBL ReturnOA Result Notes: TYPE INJ Codes TYPE TEST Codes INTERVAL Code. Result Code. W=Water P=Pressure Test 1=lndal Ted P=Pass G=Gas O= Other describe in Notes) q=Four Year Cycle F=Fail S=Slurry V= RequiredM Variance 1=lnwncleave 1= IMueaial wasemser O= Other (describe In notes) N=Not injecting Form 1 OA26 (Revised D1/2D17) MIT Pau Fri 07-11-19 Submit to: lim.reoaplalaska. aov. OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOOCC REP: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test AOOCC.Inspectorsr®alaska aov' phoebe bmoksrilialaskegov BP Exploration (Alaska) Inc. Pmdhoe Bay I PBD I PW DW3 Waived Witness ' chris.walla.M.Iaska oov q j\ 6,9,p-tZ(IL `l 1 Well PWDW38 INTERVAL Code. Pressures: Pretest Initial 15 Min, 3D Min. 45 Min. 60 Min, q=Four Year Oyda F=Feil PTD 2190810 Type Inj N - Tubing 218 219 219219 N = Not Injecting Type Test P Packer WD 4324 -1 RBL Pump 1.5 IA 1 1598 7523 1508 - Interval O Test psi 1500' BBL Return 1.4 OA 98 306 285 1 247 Result P Notes: i Pre injection AOGCC MIT -IA, witness waivetl Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type lnj Tubing Typa Test Packer WD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTDTy pa Inj Tubing Type Test Packer TVD LP BBump IA Interval Test psi BBL Return OA Result Notes: Well Pressures'. Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min, 30 Min. 45 Min. 60 Min, PTD Type Inj Tubing Type Test Packer WD BBLPump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj TubingType Test Packer TVD BBLPump IA Interval Test psi BBL Rehm OA Result Notes: Well Pressures: Pretest Initial 15 Min, 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer WD BBL Pump IA Interval Test psi BBL ReturnOA Result Notent: Well Pressures', Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD B91 -Pump IA Interval Test psi BBL Return OA Result Notes: TYPE INJ Code. WPE TEST dotting INTERVAL Code. Result Cotler W=Waley P=Pressure Test 1=initial Teat P=Pass G=Ges 0= Other (dain eIn Nobad q=Four Year Oyda F=Feil S=slurry V= Required by Variance 1=Inconclusive I=1Muabiai Wasrawarer o=other (bacon. in notes) N = Not Injecting Form 10-426 (Revised D1=17) MIT Peu PVKYAT 2 07-24-1e Boyer, David L (CED) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Thursday, May 30, 2019 10:25 AM To: Boyer, David L (CED) Subject: RE: Typo in PBU PWDW3-2 Assigned API Number Thanks Dave, we will update it accordingly Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W: (907)564-4649 C:(907)223-9529 Bradley.Gorham@bp.com From: Boyer, David L (CED) <david.boyer2@alaska.gov> Sent: Thursday, May 30, 2019 10:21 AM To: Gorham, Bradley M <Bradley.Gorham@bp.com> Cc: Davies, Stephen F (CED) <steve.davies@alaska.gov> Subject: Typo in PBU PWDW3-2 Assigned API Number Hi Bradley, We found a typo in the assigned API number for the BP PBU PWDW3-2 recently approved PTD application. On your Duplicate Copy, please change the API number to: 50-029-23634-00-00. Sorry for the error. Thank you, Dave Boyer AOGCC THE STATE ALASKA GOVERNOR MIKE DUNLEAVY Kenneth W. Allen Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.cogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Undefined Water Disposal Pool, PBU PWDW3-2 BP Exploration (Alaska), Inc. Permit to Drill Number: 219-081 Surface Location: 4912' FSL, 4874' FEL, SEC. 03, TION, R14E, UM Bottomhole Location: 304' FSL, 264' FEL, SEC. 33, TION, R14E, UM Dear Mr. Allen: Enclosed is the approved application for the permit to drill the above referenced service well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED thigZ f ad y of May, 2019. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMISSI PERMIT TO DRILL 20 AAC 25.005 la. Type of Work: 1b. Proposed Well Class. Exploratory - Gas ❑ Service -WAG ❑ Service - DispO 1c. Specify if well is proposed for: Drill O Lateral ❑ Stratigraphic Test ❑ Development - Oil ❑ Service -Winj ❑ Single Zone O Coalbed Gas ❑ Gas Hydrate❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development- Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket O Single Well ❑ 11 � Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 PBU PWDWi ' 3 Address: 6. Proposed Depth: 12. Field/POoI s : ( ) P.O. Box 196612 Anchorage, AK 99519-6612 MD: 6303' ND: 6221' PRUDHOE BAY, PRUDHOE DISPOSAL WELBAY L WATER 4a. Location of Well (Governmental Section). r6 � g g'Z� e 7. Property Designatlon (Lease Number): F $(� ` ADL 028312 & 028309 Surface: 4912' F2C, 4674' FEL, Sec. 03, TION, R14E, UM 8. DNR Approval Number: 13. Approximate spud date: Top of Productive Horizon: 74' FSL, 46' FEL, Sec. 33, T1 1N, R74E, UM 77-044 June 10, 2019 / Total Depth: 304' FSL, 264' FEL, Sec 33, T10N, R74E, UM 9. Acres in Property. 2560 14. Distance to Nearest Property: 21491 ` 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10, KB Elevation above MSL: 86.25 feet 15. Distance to Nearest Well Open Surface: x- 676721 y- 5945289 Zone - ASP 4 GL Elevation above MSL: 39.10 feet to Same Pool: 06 16. Deviated wells: Kickoff Depth: 600 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 10 degrees Downhole: 2830 Surface: 2216 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Grade Cou lin Len th MD ND ND including sta a data215.5# A-53 80, Surface Surface 80' 80' 260 sx Arctic Set (AD0Mi MHasmaWeight 68# - 3282' Surface Surface 3282' 3246' 2150 sx LiteCrete, 312 sx Class'G' 47# L-80 V m 21 6303' Surface Surface 6303' 6221' 1046 sx Class'G' 19, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effect Depth MD (ft): Effect. Depth ND (fl): Junk (measured): Casing Length Size Cement Volume MD ND Conductor/Structural Surface Intermediate Production Liner F'ertorelion Depth MU Perforation Depth ND ft Hydraulic Fracture planned? Yes ❑ No O 20. Attachments Property Plat O BOP Sketch O Drilling Program O Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch O Seabed Report ❑ Drilling Fluid Program O 20 AAC 25.050 requirements O 21. Vernal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Gorham, Bradley M from without prior written approval. Authorized Name Allen, Kenneth W Contact Email Bradley.Gomam@bp.cem Authorized Title Engineering Team Lead Contact Phone 907-564-4649 Authorized Signature Data 1) V5 Only 'a$onall Permit to Dnll See cover letter for other q Q' API: p Permit Approval �'I Number: 50-07-9 `_O'+� �Z \ 363 -►0 -Q Data: 20I requirements: Conditions of appro11vall1: If box is checked, well may not be used to explore Tor, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ET Othi4 bye. -w4 jpa-TE51'Z'p A4 r Samples req'd: Yes ❑ No Mud log rebid. Yes ❑ No l /'• g L �� j� 1.� saPl Pct H2S measures Yes ❑ No 9� Directional svy req'tl: Yes Q'• No ❑ Spacing exception req'd: Yes ❑ No I� Inclination -only svy rebid: Yes ❑ No Er 6n� ��a+D t ANGen�Y�COt��- v? F AIR- zrO .l ✓ �145N PAbDZ-6II207- AEG~ 0 ❑ Post initial injection MIT req'd: Yes No ❑ G o R gT IGOd' o K,�j 21 4.Ltriff / APPROVED BY s/ 'lz Approved by. COMMISSIONER THE COMMISSION '] Date: / J, -k 61;4M Form 10.401 R&8d 52017 This permit is Valid for 241 0R ko1R[hf datAOF al L., (20 AAC 25.005(g)) M6 66 Form and V Attachments in Duplii 4W-14 9, 5/-Z3/fl by 0 To: Alaska Oil & Gas Conservation Commission From: Brad Gorham, ODE Date: May 22, 2019 RE: PWDW3-2 Permit to Drill The PWDW3-2 well is scheduled to be drilled by Parker 272 in June 2019. This grassroots well is a slant injector well targeting the Ugnu formation. The planned well is a two string, big bore well utilizing 13-3/8" surface casing and 9-5/8" production casing. This will be followed by a 5-1/2" x 7" tubing string.The surface casing will be set in the SV4 shale and the production casing will be set in the WS1. The maximum anticipated surface pressure from the WS1 with a full column of gas from TO to surface is 2,216 psi (assumes 8.87 ppg EMW most likely pore pressure and a 0.10 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 4,000 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on PWDW3-2, please do not hesitate to use the contact information below. Brad Gorham Office: (907) 564-4649 Cell: (907) 223-9529 Email: bradlev.00rham(bbp,com Attachments: Well Bore Schematic Diverter Line Layout Diagram Directional Package As -Staked Survey BOPE Schematic Area Review Map PWDW3-2 PTD 1 5/22/2019 Planned Well Summary Well PWDW3-2 Wee Injector b egt ve Ugnu Current Status Grass Roots Well Estimated Start Date: 1 6/10/2019 1 1 Time to Complete: 1 17.0 Days SurfaceNorthin Northing Eastin Offsets TRS Location 5,945,289 676,721 1 4912' FSL / 4874' FEL 1 10N 14E Sec 3 Planned KOP: 600' MD Planned TD: 6,303' MD / 6,135' NDss Rig:Parker 272 GL -RT: 47.2 RTE ref MSL : 86.25 Directional - BHGE WP03 Maximum Hole Angle: Northing Easting TVDss Offsets TRS Top 5,945,719 676,258 4,398 73.5' FSL / 45.6' FEL 11 N 14E Sec 33 U nu BHL 5,945,944 676,034 6,135 304' FSL / 264' FEL 11 N 14E Sec 33 Planned KOP: 600' MD Planned TD: 6,303' MD / 6,135' NDss Rig:Parker 272 GL -RT: 47.2 RTE ref MSL : 86.25 Directional - BHGE WP03 Maximum Hole Angle: `100 in the surface section -10 in the production section Close Approach Wells: PWDW3-1 fails Major risk - minor risked at 1/200 Survey Program: Reference attached directional program Nearest Property Line: -21,491' Nearest Well within Pool: -1,206' Hydraulic Fracture Planned? No PWDW3-2 PTD 2 5/22/2019 Formation Tops and Pore Pressure Estimate Formation Estimated Formation Top NDss Most Likely Pore Pressure EMW Fluid Type (for sands) G1 350 8.5 water SV6 1030 8.5 water BPF 1885 8.5 water SVS 2405 8.5 water SW 2640 9.39 water SV3 3207 9.23 water SV2 3406 9.18 water SVI 3817 9.11 water UG4 4398 9.02 water UG4A 4412 9.02 water UG3 4648 8.99 water UGI 5150 8.94 water WS2 5745 8.89 water WS1 6000 8.87 water PWDW3-2 PTD 3 5/22/2019 Casing/Tubing Program Hole Size Casing / Tbg O.D. WUFt Grade Conn Length Top MD / TVDss Bottom MD / TVDss 42" 20" x 34" 215.5# A-53 - 80' Surface 94'/ 80' 16" 13-3/8" 68# L-80 BTC 3,282' Surface 3,282'/ 3,160' 12-1/4" 9-5/8" 47# L-80 Vam 21 6,303' Surface 6,303'/ 6,135' Tubing 7" x 5- 1/2" 26# x 17# L-80 Vam Top HC ^4,500' Surface -4.500'/4,368' Mud Program Surface Mud Pro erties: MMH Depth Interval Density PV (cp) yp I4/700it� Surface- 13-3/8" TD SV4 8.5-9.6 1 6-20 1 35-80 Production Mud Properties: LSND Depth Interval Density ppgIb/ pV (cp) YP Ooftr 13-3/8" Shoe - WS 9.6-99 1 10-20 1 20-30 Logging Program surface Sample Catchers - not required for surface hole Drillin Dir/GR Oen Hole: I None Cased Hole: None Production I Sample Catchers - as requiredb Geology Drilling: I Dir/GR/RES Oen Hole: i None Cased Hole: I CBL PWDW3-2 PTD 4 5/22/2019 r Cement Program Surface _.. ...... ,..,.,. Lead Oen hole volume + 350% excess in permafrost and 40% excess below permafrost Lead TOC Target surface Basis Tail Oen hole volume + 40% excess + 80 ft shoe track Tail TOC 500 ft MD above casing shoe Spacer -100 bbls of Viscosified Spacer weighted to -10.5 Mud Push II Total Cement Lead 731.3 bbls, 4106 cult, 2150 sks of 11.0 ppg Dee CRETE -1.91 cuft/sk Volume Tail 64.4 bbls, 362 cult, 312 sks 15.8 ppg Class G - 1.16 cuft/sk Temp BHST 57° F Production _.. ...... ,..,.,. Lead N/A Lead TOC N/A Basis Tail Open hole volume + /o excess + 80 It shoe track Tail TOC -500 ft MD below surface casing shoe Spacer -50 bbls of Viscosified Spacer weighted to -11.0 Mud Push II Total Cement Lead N/A Volume Tail 216.2 bbls, 1214 cult, 1046 sks of 15.8 ppg Class G - 1.16 cuft/sk Temp BHST 118° F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub -Surface Pressure Management: No wells need to be shut-in for pressure management. Anti -Collision: All offset wells pass BP anti -collision scan criteria Offset Well Ownership Information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. Hydrogen Sulfide Reference "Drilling Critical Issues' section. Faults Reference "Drilling Critical Issues" section. Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. PWDW3-2 PTD 5 5/22/2019 Well Control The 16" surface hole will be drilled with a diverter (see attached diverter layout). The 12-1/4" hole hole section will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP test frequency for PWDW3-2 will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 12-1/4" Production Interval Maximum anticipated BHP 2,830 psi at the WS1 at 6,135' TVDss 8.87 ppq EM Maximum surface pressure 2,216 psi at the WS1 (0.10 psi/ft gas gradient to surface) 25 bbls with 11.60 ppg frac gradient. Kick tolerance Assumes 8.87 ppg pore pressure in the WS1 + 0.5 ppg kick intensity and 9.6 ppg MW. Planned BOP test pressure Rams test to 4,000 psi / 250 psi. Annular test to 3,500 psi / 250 psi Integrity Test—12-1/4" hole LOT after drilling 20'-50' of new hole 9-5/8" Casing Test 4,000 psi surface pressure PWDW3-2 PTD 6 5/22/2019 Variance Requests 1. (GRASSROOTS)To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000 ft). This is a variance from 20 AAC 25.033. Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.5 — 9.6 ppg fluid will provide over balance to formation fluid. PWDW3-2 PTD 7 5/22/2019 Drill and Complete Operations Summary Pre -Rig Operations 1. Install conductor and cellar box. Weld landing ring. Survey. Rig Operations 1. MIRU Parker 272. SS t 2. Nipple up diverter system and function test 241 "e ftdat , c.4L 3. MU 16" surface motor drilling assembly and drill to TD. POOH and LD drilling assembly. 4. Run 13-3/8" surface casing to TD and cement. 1. Nipple down diverter system. Nipple up 13-5/8" wellhead system and nipple up BOPE and test to 4,000 psi. (Configured from top to bottom: 13-5/8" annular preventer 9-5/8" FBR in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBR's in the lower cavity). a. Notify AOGCC 24 hrs in advance of full test. 5. Test surface casing to 4,000 psi. 6. MU 12-1/4" intermediate drilling assembly and drill shoe track and 20'-50' formation. 7. Perform LOT. G M1rSrwtC. T CST flA?}> z.& -r 1h 16- iTAz_ Y'NprA s o 40GC_C'_ 8. Drill to 12-1/4" section to TD, POOH and LD drilling assembly. 9. Rig up and run 9-5/8" casing to TD and wcement. 10. Rig up a -line unit and run CBL. GB L• V #rTM' -ra A, 0 G-ce- 11. Run 7" x 5-1/2" tubing with 9-5/8" x 5-1/2" production packer. /� 12. Circulate inxofQer A)&- 9.5 ppg brine cap. Allow brine to U-tube. �G,+206-5 Ae'eW�'!ST 13. Set TWC and test. _0 yam 14. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 4500 psi. 15. RDMO Parker 272. Post -Rig Operations: V: Tree work as Needed I SL Drop ClSe Set Packer. Pull AO RHC. Drift to -IA / p;e6-ezC (4�6,G�/Zy�� �a ��G� Tp FB: Circ I Seawater. Witnessed AOGCC MIT-T/MIT-IA /- /7� EL: Add Perfs. Expect -7 runs/120'. 4 c SUEL: SBHP pre Injection FB: Assist EL DHD: AOGCC MIT -IA PWDW3-2 PTD 8 5/22/2019 PWDW3-2 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Production Hole: The SV's are expected to be at a 9.39 ppg EMW and the Ugnu is expected to be 9.02 ppg EMW. Pressures will be controlled by using 9.6 — 9.9 ppg water based mud for the interval. II. Lost Circulation/Breathing A. There are no expected fault crossings for this well trajectory and the risk of lost circulation has been characterized as low. III. Fault Locations There are no planned fault crossings for this well trajectory. IV. Integrity Testing Test Point I Test Depth I Test type EMW Ib/ al Ji 13-3/8" Shoe 1 20'-50' from the 13-3/8" shoe I LOT 11.60 ppg PWDW3-2 PTD 9 5/22/2019 V. Hydrogen Sulfide ' Flow Station 3 is not considered an H2S site. There is no history off H2S on the pad The only previous well on this pad was a produced cretaceous water injector. VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but an offset must be shut-in to pass scan criteria: • PWDW3-1: Is inoperable and in process of being P&A'd. If P&A is not complete by time of execution, PWDW3-1 will remain shut-in for the entirety of PWDW3-2 drilling operations. THERE IS NO FS3 PAD DATA SHEET AS THERE HAS ONLY BEEN ONE PREVIOUS WELL DRILLED ON THIS PAD. PWDW3-2 PTD 10 5/22/2019 Well Name H2S Level Date of Reading #1 Closest SHL Well 112S Level N/A N/A N/A #2 Closest SHL Well H2S Level N/A N/A N/A #1 Closest BHL Well H2S Level N/A N/A N/A #2 Closest BHL Well H2S Level N/A N/A N/A #3 Closest BHL Well H2S Level N/A N/A N/A #4 Closest BHL Well H2S Level N/A N/A N/A Max Recorded H2S on Pad/Facility N/A N/A N/A VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but an offset must be shut-in to pass scan criteria: • PWDW3-1: Is inoperable and in process of being P&A'd. If P&A is not complete by time of execution, PWDW3-1 will remain shut-in for the entirety of PWDW3-2 drilling operations. THERE IS NO FS3 PAD DATA SHEET AS THERE HAS ONLY BEEN ONE PREVIOUS WELL DRILLED ON THIS PAD. PWDW3-2 PTD 10 5/22/2019 Y 0 Q m J Q >, u o cn E N �. i w 3 3 a Z a a a a a . C a r U z 3 r j N N � � m m � 3 x m e fi° em w Z C K u p U Y N S O c z z n z z S 2 ° a a LM S w U m U y C O a L 6 > a a O a m c a a u j 3 u e J u of zo 2 J f9 >❑> N o J 1- Z O r L N a OI ❑ r T f a Z m � y c c a n a a d m 3 . C r z � z 3 r j m m � N O a m e fi° em w Z C K u 3 w N p em O c Z W N S LM J J U . C 0 0 j m m N O a C O p e w Z C K u 3 w c C O O c Z W N S LM J J U 6 > a a O ; U a N 3 b e J J f9 L N OI ❑ r f I y c a n a v n m I N Y LL ° � 5 N a o r m O N O N M n o j > > o b m m a m b O o b O o 0 b O) CI b YI N n y O1 N m b ° b Q 0 . C 0 m m a C O p w Z C K O1 9 C w C O O c Z W N S 2 W ; U a N ❑ . C m a N ❑ r a n v n Z N a o r m N N N L O O O a j b ❑ 0 0 0 ��ii1 2 O N O N d a ppZ m a a a a a n Z y1 e c r o a s ° . C I I O O O O O O O O O O O O O O O m m m 3 m We N h N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o R a V O O O O O O O O N N N N N N O g O z U m Q w � % p� 5p a N n r % ry O O O O O O O O m fO n N N N N A N N L �j LL LL J S Q Q m m Q m Q m Q Q m m Q Q m m m O N O Q N M m fJ � O O O O O O O OO O W N m W W r LL z z a a m w 0 0 N N 0 N 0 N 0 0 N N 0 o N N M n W O N N m W b M M W Q O O O O O O O O O m N m b O r y U W W W m m W m W m W W m m W W m m W m O W Q W O O W O W O N C Q mr L C C N N N N N N N N N N N N N N N N N N N N N N M N M N M N M N °i ro m m w w �i w m m w m m m m m u % CO `m_ 0 0 0 0 0 0 0 0 o m b a W o m r m Q .� O O O O O O O O W w 2 a + a + O LL O N LL N O O O O O O N O Q Q W m m Q O O O O O O O O O �lI H m T � O N X09 CL z �� U N _C a QU $ Lh d) O N n N n N r N N r r N O n o N r N n N N N n r Q o M m + + � �i ri vi ni v of oo M ei ri of ry � m i U w LL y a p+ 0 0 0 0 0 o N o n o n m N b n O Q O O O O O O n O N O m O m O O W W W W W W m W M m r W N M Q Q N N m m n m W O O p 4' N N N z� N >mN m>N ���ggg oa000 o so oa 0000 0 a a a a a a o a o o o 0 0 o ui N N ui ui vi N m o ¢¢0 0 0 0 g 0 d W N N N N N N N d p p p p p p Q O O O O 0 0 0 0 o O O O O O O O O O N Q m b O H O a U m p M 0 0 0 0 0 0 m N N N1 Q > 9 y > S O p st m > Z d d d d d q N O O O O N O O O O O O N N O O G O O N O O g o O O O O v a o o m m O n o O 0 O 0 O O o n O N o w 9 O 9 O 0 o D O o O e N .6 rp o '� o h p, N N Q� ry m e a voi umi m$ � n m Z U 6 N Ti �i O N 6 �i p U 5Y a z i d E C �Saai-E w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d d d d o o d d d o o d o 0 o d o d d o ri d O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 6 d d o 0 0 0 0 0 0 0 0 0 0 0 0 0 qC b � J 0 0 � m m O {7 r m m H foo b w W r n m Q m b N O b b w m W O N W m m N m N m N w Q m N? N r W b O O Q tp � Vi �Np Opi r C N Oi r r N V N CQi N m Q N n N � N O di b Q m Q � O Q Q N C• frO (O f0 m m m ul Yl P w Q rn m N N . b m b N N N b N r b CI w -- r N N N N N m W N W m O CWJ v N m q 'J m b b m fro m m tr0 N m m b b m b m m m b b m m b w " N N N N N N m n d a m d c N rn r N M rn r N N Cl O m b N P m N O m m m r Q rn Q m Q m W m r W m w r N r r r N r r m N 0 N m e h b n n m m m 0 N m m a m m m r N N N N N N N N N N N z O P N O m m P N O O m (p N Cl O W O r m O W O r N r m m O N O N O m O m O P W O P W m Kr - - - - - - - - - z_ 0 n r Q$ m Q m n foo e wm N m n n r m m m b b w m m N Q m W O N Q m N � n n �i M m fmi cmi a v e m Q< 0 YO1 b N N N b m i� m va W m e w a w m w 8i m m Qw d� z Yl N N N N N VI N N N Q w P w Q rn N N N N N . b m b N N N b N r b CI w -- r N N N N O m W N W m O CWJ v N m f0 OI O Q N b r w N rn Q N m m Q W Q m m r w w co N N N rn r N M rn r N N Cl O m b N P m N O m m m r Q rn Q m Q m W m r W m w r N r r r N r r m N 0 N m e h b n n m m m 0 N m m a m m m r N N N N N N N N N N N z O P N O m m P N O O m (p N Cl O W O r m O W O r N r m m O N O N O m O m O P W O P W m Kr - - - - - - - - - z_ 0 m O (� N m Q m m N N N 0 O O N O m m W T m b f0 N N W N m m N N m m N w Q m O N Q m N m w O N r Q m y Q V Q O P Q Q< 0 YO1 b N N N b m N N N m VI N m b N N N P P w rnW Q Q w Q w N Q w Q W Q m Q w Q w P w Q rn N N N N N . b m b N N N b N r b CI w -- r N N N N O m W N N m O O W n N m W Q N Q N b r w N rn Q N m m Q W Q m m r w w co N N N N N N N rn r N M rn r N N Cl O m b N P m N O m m m r Q rn Q m Q m W m r W m w r N r r r N r r m N 0 N m e h b n n m m m 0 N m m a m m m r N N N N N N N N N N N z O P N O m m P N O O m (p N Cl O W O r m O W O r N r m m O N O N O m O m O P W O P W m Kr - - - - - - - - - z_ 0 m O (� N m Q m N W N N 0 O O by 0 b rn Q N Q 0 N pr Q N m m fp W O m M Q Q N^ 0 V1 Of 0 0 0 0 0 0 N 0 0 0 0 0 0 0 N N f N N f N N N N N N N m C N N N N N N N b O o O NO N 2 j w f -- �- - c �i 14 c4 N rn r N M rn r N N Cl O m b N P m N O m m m r Q rn Q m Q m W m r W m w r N r r r N r r m N 0 N m e h b n n m m m 0 N m m a m m m r N N N N N N N N N N N z O P N O m m P N O O m (p N Cl O W O r m O W O r N r m m O N O N O m O m O P W O P W m Kr - - - - - - - - - z_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N b N O b N N N N N N N N N N N N b O o O NO N w f -- �- - c �i 14 c4 n N N N ; N N ;O N N N i (0 W m m 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 e� a 9 Z a a a a s m O o 0 0 0 0 0 o m o 0 0 0 o N o o o N n o o 0 0 T w O O o O 0 0 O O 0 O 0 O 0 O 0 O 0 m 0 O 0 0 O O 0 O 0 m o O - n m rn O o O NO N w f -- - c �i 14 c4 n N N N ; N N ;O N N N (0 W m m n d a m d c a 9 m m m m m m m m m m m m m m m m m m mom m m m m 0 m 0 m m m m m m m m m m mmm m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o L d m f h oOO 0 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O O 0 0 O 0 O 0 O 0 O 0 O O 0 0 O O 0 0 O 0 O 0 a U o o a o 0 0 0 0 0 0 0 0 0 D Q N U W 0 � r Y d d Q W (h m Q N m m N mW Q V m m m n m O O n W > J >p U Q N m m m O N N Y !! Y Y E m P Q l+ml Q N Q Q V O Q W l7 l7 W n M m p (7 Cl M M M M N (7 M W m N N n m N N N N J R' d Z Z E C W� m m n t0 n t0 n (O n m n t0 n m n 0 n tG n tC 10 n n f0 n t0 n (O n 10 n 10 l0 n n t0 b n n tG n �G n v 5 5;= o �o m m m m m m m m mmm m m mmm m m m m m m n m O Q W Cl N_ O W n m Q m M N W m f0 m U pl Q m n N m m W O N (7 @ m m m m m O N l7 (7 Cd p C m m m N N m m m m m m m m m m m n n n n n 0 LLLy C In W m m m N VI @ m P m P m Q N Q m m Q Q N Q m Q m Q m Q N m Q Q m N P@ m Q m Q d rE O OQ1 OQl W m N w w dr Z m N m N m m m m N m Y) m m N m N N m m m m d p m m m `o N y c p Q b� bp n N 0 m m O a O m m CO v, n W N fn m U b U: q b T N N N Cl l7 l7 M N N CI M CI C'I M lh C C O T ry m N O S N O N O Q n N OI N Di t'f Cl m m m n 0 m m O O � Y1 N n Di th Q m VI ul m m N Cl m (7 to m m N M Cl M W Q Q Q Q Q Q P a t m +c m y �: m a `5 � O S m m m n m O m m m n til O W N W n Q N n m W M P W Of t7 n m m m m n m n m N m O m W n O m n A n W m n Q n m W M n W n m m m n O m m m m W N 10 t' O W m N OQ d m W O N Cf Cf V m m n m m W O NM M W ym O w N N CI Ol Ol o] to m m M M N M M C'1 !f Q Q Q Q Q P 4 z " W N n m m M m N m m o O l7 m m o O mm NN Q N N n 0 O 0 N m m m N O m o O 0 O m m m m m m m Q l7 m N m O m Cl m W m n m m m Q m Q W CI m m O m m QQ n m Q m n W m m O N N N m V P m m n m m W O N m P O 4 z� omm m mm m m mm m m m m mm m m mmm mmm m$ m mmm mmm mmmm mmmm m m N N m m m m m m m m m m m m N m m m m m a m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g 0 0 0 0 S o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q n o 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 g0 a 3 m p5 pp� p5p� p5p� o m 5 5 5 0 0 o W o 0 o m o o m n � O O O O@ O O N O O O m O O O O O O m N 0 S N pO O O S O m O O O 0 0 0 N pO Q m Q t q O C O M N! N N N t+i l7 th l7 m; @ v m N m n m W W O N {7 Q m N m a R A P U O C n b a m E� u y m gg c O C U6'rYn33 d a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 o a d m u _ 0 n ti w 0 0 0 0 0 0 0 0 0 0 00 00 0 0 0 0 0 0 0 0 0 0 0 0 o O O 0 o 0 0 0 0 0 0 0 0 o 0 d U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z U J � • d � N N O Q O m m � N N O r N W m m m W W O N m IU N b O W r A a s Q ? m W m m N m b m W P m W r m m o P W W M m >^ CJ m P N O n b N O W r P N W r P V^ N N p Q a z z E «" m ro m^ n n fo m ro ro m n n n n n mr n a r E w w n W a m o m m n m e m N o m o o S ur o N N N N N N N W o u O N N b^ m S N N N m p m m n m W W O N N m m pQ W W Or � « L C b m b b m PW b m b m b m V m P N Q b Q b P VI P VI Yl P P b P b Q O) m P mp m b W b W ur N m N = W m m m m W W w W b W Yf W b W b b N b N Zi b m m m N b b VI b b b m m b m d p O •_ V N m n r O m m OR W Q n O N N b m P t7 b W O, i Qr � A N Q P m m t7 Yl n m O N N r Oi r m W m Rl b N ur O n O w d d U y m n m m W N M Q P m m r m m W Yf m O f0 N ttl N (D C'l (SI Q � b f0 tSl b m A p > O O O J F 2 Z m 0 L O Q N N O m b n m n m O y [7 m W m n W ' P m r W O N r b b m P m N O Q b Cl m m O m W T m n m m W N CI Q Q m r m W O N N y m P Q Q Q P m m b m b b m m Ifl b m m m m m m m m CL Z m c m 'z C m a W m m Cl n O m m N m n P N N r b r O N m m m Q N f0 m n O �p b O n N S O r m m p {7 O m O r b P N W W m W m W b m m W O W W m N m N m b d m P r(1 W b m Yf b m n m m N W y O Q P P N Q W P Q P b m n r m W W O O rn A y m a m N O m l7 W n O b l'1 W r b O W O O m m b m N CIA W W N N N N N N N r n IPp N n m ANI O N N m Q m b n m m W O O _ N O O O O O VI N O O m O O m O O b O O b O O N O O r(1 O O b O O b O O b O O O O m N O O b O O b O O b O O N O O m O O m O O b O O ur O O m n W m W m W W W m m W W m m m W W W N m W W W a m g 0 o o 0 0 O 0 o o S 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 O o m o 0 0 0 0 0 0 0 0 0 0 0 112 0 0 0 0 0 0 0 o f o 1 r N 13 N as m pp33'' Lm Y v O o m m 3 z a a s a s o 0 0 0 0 0 o m o 0 0 0 0 0 W 0 0 0 `1i o ry I` S g a T a 0o o n O lA o O 0 O 0 O 0 O o O Q C) o O 0 O 0 0 0 O O 0 O b n 0 O 0 O 0 O m O N O yrj a t m r r m W O N N m P b b m n b b m m m b W y m O m m m N N m N m m T m Q N A J e C 4 0 d L N p O y d d m C A N t)a in33 m 'a \ \\ J� !\` /zz �— !|m !|2!)§ §a;!!;§!;§§§222 ®®k]]/§/§ • |ki(I;C414 :___/;_ ! cj 0 . § CL f \ �� ■ 2\° / \ !\` §a;!!;§!;§§§222 ®®k]]/§/§ • |ki(I;C414 :___/;_ ! cj 0 . § 0 a m N a a � U O N » Q U 0 0 N N � N N Q W W � N N r r a d 3aa �Q ui pp U �p a z z E ¢ 6 C 9 y O L b d a C O C V y a a V o d ,�`a_ m V W K U a d O >�> Z O Dd J F� N r � O Ir D T N g d m n N 0. m � W N m c a m m c a a m c N (Op D 10 n W m $ U 0 A r 2 d Q o m o W o n N O O N r 3 m a W d F C 0 0 U o m o N q O n W Z j m Q N r N N d JJJJ N N O N V a N N N N N n V Q > O N N N z°a � � 4 O T N Q � Qi by 9 T C D N E d a O a C V d p va` in33o a U North America - ALASKA - BP PBUSAT PWDW PWDW3-2 PWDW3-2 PWDW3-2 WP03 Anticollision Summary Report 21 May, 2019 by Company: North Anal -ALASKA - BP Project: PBUSAT Reference Site: PWDW Site Error: 0.00usft Reference Well: PWDW3-2 Well Error: 0gousft Reference Wellbore PWDW3-2 Reference Design: PWDW3-2 WP03 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well PWDW3-2 PLAN KB - P272 @ 8625usft PLAN KB - P272 @ 86.25usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum tolerance PWDW3-2 WP03 'filter type: NO GLOBAL FILTER. Using user defined selection 8 filtering criteria Reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA iepth Range: Unlimited Scan Method: Tray. Cylinder North tesubs Limited by: Maximum center -center distance of 825.59usft Error Surface: Elliptical Conic Survey Tool Program Data 5/21/2019 From To Reference (usft) (usft) Survey(Wellbore) Tool Name Description 47.15 1,000.00 PWDW3-2 WP03 (PWDW3-2) BLIND Blind drilling 47.15 1,000.00 PWDW3-2 WP03 (PWDW3-2) GVD-GC-SS Gymdata gyro single shots 500.00 3,282.00 PWDW3-2 WP03(PWDW3-2) MWD MWD - Standard 500.00 3,282.00 PWDW3-2 WP03(PWDW3-2) MWD+IFR+MS-WOCA MWD+IFR +Multi Station W/O Crustal 3,282.00 6,303.04 PWDW3-2 WP03(PWDW3-2) MWD MWD -Standard 3,282.00 6,303.04 Pill WP03(PWDW3-2) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) EX PW -3-1 PWDW3-I-PWDW3-I-PWDW3-1 773.03 775.00 181.55 136.69 44.93 Pass - Minor 1/200 &21/2019 2:48:33PM Page 2 of 3 COMPASS 5000.1 Build 81D RE Company: North America -ALASKA - BP Project: PBUSAT Reference Site: PWDW Site Error: 0,00usft Reference Well: PWDW3-2 Well Error: 0.00usft Reference Wellbore PWDW3-2 Reference Design: PWDW3-2 WP03 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well PWDW3-2 PLAN KB - P272 Q 86.25usft PLAN KB - P272 @ 86.25usft True Minimum Curvature 1.00 sigma EDM RSK- Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to PLAN KB - P272 @ 86.25usft Coordinates are relative to: PWDW3-2 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 - OGP-Usa AK Central Mendian is 150° 0'0.000 W - Grid Convergence at Surface is 1.34° Ladder Plot 800- 600- 400— ---------- 00 i x o N i i II i C y__ O i � d aoo i C U-- ---- -- ------ 200— U ----200U -----1---- ----- --- -------- 0_-____- 0 750 1500 2250 3000 3750 4500 Measured Depth (750 usWin) LEGEND -6- PWDVJ3-1, PWDW3-1, PWDVV3-1 V1 $ PWDW3-2 WP03 &21/2019 2..48:33PM Page 3 of 3 COMPASS 5000.1 Build 81D (u(/Ssn 001) (+)9>.toW(-)97noS 00 1100 1200 M O a N a M a 3fi00 3200 p � zaoo e 0 2400 1 � M 2000 m c° M CD 3 � 1 16W V o n 3 1200 � r B00 v a nnn > U e y y y y> > 3 3 (ui sn 007) 9idaQ learywaA aruy LL JAM Qy3 e'a Uoo ma ._ n e�-w �oo�oo � oo oa.�oo �:" Qg�3g Fqo oc �or� B�V'gFFF O w zero �a r5 L E&a imp; .-vo Q oe888 F �i 3333 as A r� 1�r`ai ��33333 oommm a����� 3N MINN .ya �_Nnan 00 1100 1200 M O a N a M a 3fi00 3200 p � zaoo e 0 2400 1 � M 2000 m c° M CD 3 � 1 16W V o n 3 1200 � r B00 v a nnn > U e y y y y> > 3 3 (ui sn 007) 9idaQ learywaA aruy LL u 3 j222� sz=e� Qw32^m a ;a IN m ro6Noo O M \ a ng sa 8 S FAV R o pp N R�" N8 6 f`rt.B. 51z3114 Area of Review— PWDW3-2 Well Name Distance From Planned Well(ft) Annulus l magrity Top of Pool (WDss) TOC AVOW -� MIT -IA Passed tol9]9psi on9/12/18 n., Gne YY WY,hwN Mm party °tea 550' Caliper Indicated Tbg buckling/axial displacement at -3,600' Pumped 98 bbls of 15.8 ppg Clan,G cement. Assuming 30% MD. Well is planned to have the injection interva l P&A'd -32W washout, the estimated TOC is at 4601'AD. Qt prior to the drilling of PWDW3-2. v.sr MIT -IA passed to 3,000 psi on 4/13/2012 Pumped 102 bills of 15.8 ppg Class G cement No losses were 0]-22/0]-22A 1206' MIT -OA passed to 2,000 p psi on 4/13/2012 -3268 reported during the cement job. This places the TOC, assuming 30% washout at 6,094' M0. OD PWDW3.2 n., Gne YY WY,hwN Mm party °tea pA u+.Mw Qt v.sr rAw' ry �PWDW3 2 PWDW3-1 i 1 EAST DOCK 33 I 34 I �THISMWECT 4 VICINITY MAP NTS LEGEND: + AS -STAKED CONDUCTOR ■ EXISTING CONDUCTOR 3 NOTES: \< 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. 2. BASIS OF LOCATION IS FLOW STATION 3 MONUMENTS 3A AND 3B. FLOW STATION 3 3. VERTICAL DATUM IS BPXA MLLW. 4. GEODETIC POSITIONS ARE NAD27. 5. FLOW STATION 3 AVERAGE SCALE FACTOR IS: 0.9999353. 6. DATE OF SURVEY: MAY 20, 2019. 7. REFERENCE FIELD BOOK: NS19-11 PP. I1-13. GRAPHIC SCALE 0 175 350 700 ( IN FEET ) 1 inch = 350 ft. LOCATED WITHIN PROTRACTED SECTION 3, T. 10 N., R. 14 E., UMIAT MERIDIAN, ALASKA WELL NO. I A. P. COORDINATES PLANT COORDINATES GEODETIC POSITION DMS) GEODETIC POSITION(D.DD) SECTION OFFSETS PAD ELEVATION CELLAR BOX EL. BASE FLANGE EL. PWDW3-2 Y= 5,945,289.05 X= 676,720.84 N— 5,545.29 E_ —5,271.74 70'1521.919" 148'34'18.129" 70.2560887' 148.5717024' 4,912' FSL 4,874' FEL 39.1' N/A N/A bell tliAWN: DRAPER by p DKED: E ACOBS DAIS: 5 20 9 IXtAXWG FRB19 F53 01 EOA FLOW STATION 3 AS—STAKED CONDUCTOR WELL PWDW3-2 ��_ 1 of 7 COAD AECC582 NDuA7�1A eaw 1=350' m 5/20/1 lmlm ion WmnlunaxKuo .0 10, DAIS RE'ASM BY OIK `\ 1160' `--------------------_--------- Parker 272 on Well I i Enter/Exit _ - PWDW3-2 _f 75' Radius ------- WDW3-1 I Ignition Sources I II B 4947 1 9 / 7 I II � � I 95 4 4 2 �— 4924 4916 I I I \1 48 95 4937 4 I94 M 91 4917 4925 976 97 4941I I \ 9 4923 I I I^ 4944 I I 4914 4943 4992 I I 4909 4908 97 I I 4901 4902 490319 3 95 95 95 94 99 I I I 3 I 4 7 4913 4910 4940 I I. 4905 4904 4912 4911 I I I I Liz 4932 N 4930 90 I I 4934 931 4906 90 9 B \ 4816 4994 I I I I ISI � I \ -r r n - `\ 921— \ \v I I \ 1 ` 92 I \ I �I 1 2 1 1 — Drawing not to Enter/Exit � Ilvll� 1 I' � 1 I • WELL !- WELL INJECTOR DATE: 5/1/2018 SCALE: V= 200' MAP DATE : 2017 PBU - FS3 For current Well and Service information please see One Map AK (hftps://onemap-alaska.bpweb.bp.com) OS 4495lMXd Parker Rig 272/273 New Diverter Layout Showing Distance to Ignition Sources in Red. JGS 1-2-2016 Air Heaters I Rig Boilers Exclusion Zone Loader Parking Prohibited 20' 7 Vac Trucks �j 75' 11' \ New , Diverter \Vent Line E-50'> \ � Note 1 -All ignition sources are outside the 75' radius from the end of the diverter vent line. Boilers are located on a deck 2 levels below the air heaters on the rig. Note 2 -An exclusion zone will be used to keep the loader from parking in the 75' radius around the diverter vent. Notes Diverter Plan for Well 1-5-27 1 - This diverter vent line configuration is identical in length to previous designs. 2 - There is no change in distances to ignition sources. All dimensions remain the same. FRUDHOE BAY UNIT WELL' PVVDVV32 PERAU No: API No: 50-029--00 SEC _, T_N, R � 'FEL 8 ' FNL DATE REV By C.OMMH�lIS anTe REV By cor�naars NfR4L COMPLETION 04!29/19 JMD BUILT PROPOSED 04/30!19 BG/JMD BUILT PROPOSED REV 1 04/30179 BGlJMD BUILT PROPOSED REV BP Exploration (Alaska) 2 2 ig ggg F- I I •ol 0 �I ,rinif Y+rn �MfeGG Ke „ro c. — a .ann� raa . i1Y9(CO 1rKN �M taut w2 VO tv p, wr JY rKw. nuK(n rJi� nNOn1El v �NL�OJ� x _.Y 2'vJ We OrVCRiEP LONrrC_a� r1-r9C.trP I I.K \Yi N1NOR<� RV�rrrir.0 •00� sl nu'L.. sy v.G. Lsr w.•. •a �� ns xu ox�Vy PRUDHOE BAY DRILLING BIG BORE WELLHEAD SYSTEM PRUDHOE BAY.ALASKA Rixse, Melvin G (CED) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Thursday, May 23, 2019 1:17 PM To: Rixse, Melvin G (CED) Subject: RE: PTD 219-081, PBU PWDW3-2, 9.5 ppg to 500' Freeze Protect Mel, The fluid density is picked based depending on the pore pressures of what formations were drilled and what hydrostatic overbalance needs to be maintained. In this particular scenario it is not necessary to utilize a 9.8 ppg brine as the highest PP formation we are opening is 9.39 ppg EMW. The 9.5 ppg brine will be circulated out and corrosion inhibited fluids will be circulated during the post well work which will mitigate any risk of freezing. As far as the 500' of brine is concerned, this was also a typo, a non -freezable fluid will be placed across the entire permafrost interval. As for your area of review question, the well in question should be PWDW3-1 the original well that the PWDW3-2 is going to replace. Thanks, Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W: (907)564-4649 C:(907)223-9529 Bradlev.Gorha m @bp.com From: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Sent: Thursday, May 23, 2019 11:33 AM To: Gorham, Bradley M <Bradley.Gorham@bp.com> Subject: RE: PTD 219-081, PBU PWDW3-2, 9.5 ppg to 500' Freeze Protect Brad, Regarding step #12 of your procedure (page 8): AOGCC usually sees a 9.8 ppg brine as a non-freezing fluid at a several feet below the wellhead where it is protected from weather. I assume in your post rig work, BPXA will circulate in corrosion inhibited seawater before winter? AOGCC requests confirmation that 9.5 ppg fluid will not be left at surface in winter. Also, what is the justification for a 9.5 ppg brine cap to only 500'MD when bopf is 1978'MD? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin. Rixse(@alaska.gov). Transform Points I X Source coordinate system COP POLI, PWD W3- 7?�arget coordinate system State Plane 1927 - Alaska Zone d Albers Equal Area (-154) Datum: Datum: NAD 1927- North America Datum of 1927 (Mean) NAD 1927 - North America Datum of 1927 (Mean) IS L9 Type values into the spreadsheet or copy and paste columns of data from a spreadsheet using the keyboard shortcuts Ctd+C to (copy and Ctrl+V to paste. Then click on the appropriate arrow button to transform the points to the desired coordinate system. < Back Finish Cancel Help From: Gorham, Bradley M <Bradlev.Gorham@bp.com> Sent: Thursday, May 23, 2019 9:48 AM To: Rixse, Melvin G (CED) <melvin.rixse@alaska.aov> Subject: RE: PTD 219-081, PBU PWDW3-2, 13-3/8" #/ft Mel, You are correct that the schematic is incorrect, that was an oversight on my part. The surface casing will be 68#. Let me know if you have any other questions. Thanks, Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W:(907)564-4649 C:(907)223-9529 Bradlev.Gorham@bo.com From: Rixse, Melvin G (CED) <melvin.rixse@alaska.i=_ov> Sent: Thursday, May 23, 2019 9:31 AM To: Gorham, Bradley M <Bradlev.Gorham@bp.com> Subject: PTD 219-081, PBU PWDW3-2, 13-3/8" #/ft Brad, The schematic states 13-3/8" will be 72#. The program states 68#. Is the schematic incorrect? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.Rixse(aalaska.gov). Rixse, Melvin G (CED) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Thursday, May 23, 2019 11:16 AM To: Rixse, Melvin G (CED) Subject: RE: PTD 219-081, PBU PWDW3-2, Production hole cementjob Mel, The number you calculated is correct for 30% excess. We are planning for 40% excess, which was incorrectly noted on the PTD, however the volume submitted in the permit does equal 40%. Let me know if you have any other questions. Sorry for the minor mistakes as you know this was a high priority well and clearly I didn't review as thoroughly as usual. Let me know if there are any other questions. Thanks, Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W:(907)564-4649 C:(907)223-9529 Bradlev.Gorham@bp.com From: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Sent: Thursday, May 23, 2019 10:42 AM To: Gorham, Bradley M <Bradley.Gorham@bp.com> Subject: RE: PTD 219-081, PBU PWDW3-2, Production hole cement job Brad, My numbers for production hole cement volume are a little lower (^'14%). (Probably my spreadsheet) Can you confirm TOC in 12.25" x 9.625" is ^3782' MD is correct (w/30% excess)? Rixse, Melvin G (CED) To: Gorham, Bradley M Subject: RE: PTD 219-081, PBU PWDW3-2, 9.5 ppg to 500' Freeze Protect Brad, Regarding step #12 of your procedure (page 8): AOGCC usually sees a 9.8 ppg brine as a non-freezing fluid at a several feet below the wellhead where it is protected from weather. I assume in your post rig work, BPXA will circulate in corrosion inhibited seawater before winter? AOGCC requests confirmation that 9.5 ppg fluid will not be left at surface in winter. Also, what is the justification for a 9.5 ppg brine cap to only 500'MD when bopf is 1978'MD? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you area n unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.Rizsegalaska.govl. TRANSMITTAL LETTER CHECKLIST WELL NAME: PB U� Pw1)W 3 — -:1, PTD: a 19 - ©S I Development a ervice _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: Pry u 444 o�'15 POOL: "✓a-he.l�- D � sP os u � Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 hi accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50 --- from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sam le intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Cornn Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of / well logs to be run. In addition to the well logging program proposed by V(Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, tv/ composite curves for well logs run must be submitted to the AOGCC within 90 'JAVQ after com letion, sus ension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUD UNDEFIN WDSP - 6400 Well Name: PRUD.HOE_BAY UNIT PWDW3_2 Program 58R _ Well bore seg ❑ PTD#:2190810 Company BP EXPLORATION_LALAS_KA)_INC. Initial Classrrype SER ./ PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal n Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date &C 541-1 111 0 2 Lease number appropriate. .. _ _ _ Yes 3 Unique well. name and number _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 4 Well located in.a defined pool _ _ _ _ _ _ _ _ _ Yes 5 Well located proper distance from drilling unit. boundary. _ _ _ Yes I6 Well located proper distance from other wells.. _ _ _ Yes 7 Sufficient acreage. available in drilling unit. _ _ _ ..... _ _ _ Yes 8 If deviated, is. wellbore plat. included _ _ _ _ _ _ Yes 9 Operator only affected party. _ _ ........... . . . . . . . . . . Yes 10 Operator has. appropriate bond in force ... ...... _ Yes _ 11 Permitcan be issued without conservation order..... _ _ _ _ _ _ _ _ Yes _ Appr Date 12 Permit can be issued without administrative approval _ _ _ _ _ _ _ Yes 13 Can permit be approved before 15 -day wait.. _ _ _ Yes DLB 5/23/2019 ...... 14 Well located within area and strata authorized by Injection Order # (put. 10# in. comments), (For, Yes AID 4G issued on 10/15/2015 for EOA 15 All wells within 1/4 mile area of review identified (For service well only) _ _ _ _ Yes ..... _ _ 16 Pre -produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31 05.030(j.1 A),(j.2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA 18 Conductor string. provided .. ..... _ _ . _ Yes 20 conductor to 80'. and fully cemented Engineering 19 Surface casing. protects all. known USDWs . . . . . . . . . . . .......... Yes _ _ _ _ Surface casing shoe set. in the SV4 shale. Permafrost covered 20 CMT vol adequate, to circulate. on conductor& surf. csg _ _ _ _ _ _ Yes . ..... Fully cemented 13-3/8" w/ 350% excess across permafrost 21 CMT vol adequate. to tie-in long string to surf csg.. .. _ _ .. Yes 22 CMTwill cover all knownproductive horizons_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ...... Yes 23 Casing designs adequate for C,. T, B &.permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ Yes 13-3/8".68# surface casing, _9-5/8" 47# casing from surface to TD _ 24 Adequate tankage or reserve pit _ _ _ _ _ _ _ Yes .. Adequate tankage and truck support for operations 25 If a re -drill, has a 10-403 for abandonment been approved ... _ _ _ _ _ _ _ _ NA _ _ new well.. 26 Adequate wellbore separation proposed.... _ _ _ _ _ _ _ _ _ _ _ Yes _ All BP separation. criteria are satisfied _ _ ....... 27 If diverter required, does it meet regulations_ . . . . . _ _ _ _ _ Yes _ Well site is on the north side of flow station 3, no flow lines Appr Date 28 Drilling fluid program schematic .& equip list adequate. _ _ _ _ _ _ _ _ _ _ Yes All fluid. weights will be.above expected pore pressures. MGR 5/23/2019 29 BOPEs, do they meet regulation _ _ _ _ _ _ .... _ Yes 3 ram stack and annular w/ flow cross will meet regulations . 30 ROPE press rating appropriate; test to (put psig in comments) Yes 4000 psi test pressure for BOPS, 5M psi rated BOPE 31 Choke. manifold complies w/API RP -53 (May 84).. .. _ _ _ _ Yes 132 Work will occur without operation shutdown.. _ . . . .. . .......... . . . . Yes Parker 272 will be on continuous.operations ........ 33 Is presence of H2S gas probable _ ............. . . .. . . . .... No. _ Flow station 3.is not considered an H2S site 34 Mechanical condition of wells within AOR verified (For. service weu only) .. _ _ _ _ _ _ _ ... Yes _ _ _ 2 wells identified PWVW3-1 and 07-22, both_ reviewed 35 Permit can be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ Yes _ _ .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ....... Geology 36 Data.presented on potential overpressure zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . Appr Date 37 Seismic analysis of shallow gas. zones _ _ _ _ NA DLB 5/23/2019 38 Seabed condition survey (if off -shore) _ _ ___ _ _ _ _ _ _ _ _ _ NA..... _ 39 Contact name/phone for weeklyprogress reports [exploratory only] .. _ NA_ _ Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date &C 541-1 111 0