Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-088Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:219-088 6.50-029-21862-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12872 12857 9022 10347 12857 none 8644 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 34 - 114 34 - 114 1490 470 Surface 3446 13-3/8" 34 - 3480 34 -3480 4930 2670 Intermediate 10675 9-5/8" 32 - 10707 32 - 8923 6870 4760 Production 338 7" 10394 - 10732 8679 - 8943 8160 7020 Perforation Depth: Measured depth: 11150 - 12582 feet True vertical depth:8994 - 8985 feet Tubing (size, grade, measured and true vertical depth)30 - 10465 30 - 8734 10347 8644Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker SB-3A HYD PERM PKR Liner 2456 10416 - 12872 8696 - 9026 10570 11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 289157073898 2072441 1609 400 232 293 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Ryan Thompson Ryan.Thompson@hilcorp.com Authorized Name:Torin Roschinger Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-5280 Treatment descriptions including volumes used and final pressure: 13. Sr Operations Engineer Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9026 Sundry Number or N/A if C.O. Exempt: 321-241 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … CTU Extended Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028312 PBU 14-38A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Perforating 3-1/2" x 3-1/4" x 2-7/8" 4-1/2" 12.6# L-80 4-1/2" AVW TRSV SCSSV - locked open 2175 2175 By Meredith Guhl at 8:20 am, Jul 30, 2021 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), c=US, o=Hilcorp North Slope, LLC, ou=Prudhoe Bay East, email=Torin.Roschinger@hilcorp.com Date: 2021.07.30 04:59:06 -08'00' Torin Roschinger (4662) MGR30JUL2021 SFD 7/30/2021 , ADL 0028314, ADL 0047475 RBDMS HEW 8/2/2021 DSR-8/2/21 SFD 7/30/2021 ACTIVITYDATE SUMMARY 7/1/2021 CTU 9, 1.75" CT - 32.0bbl, Job Objective: Extended addperf MIRU. Perform weekly BOP test. ...Job in Progress... 7/2/2021 CTU 9, 1.75" CT - 32.0bbl, Job Objective: Extended Addperf. Finish BOP test. Continue RU. RIH with HES GR/CCL 2.20" carrier and 2.25" DJN. Test kill well with 264bbl of 1%KCl. Tagged high at 11708CTM. Could not jet off. POOH for motor and mill. OOH with logging BHA and have a +5.5' correction. RIH with 2.30" diamond parabolic milling asembly. Correct depth at flag and tag at 11719'. Eventually work through obstruction after multiple stalls and overpulls. Tag again at 12140' and push to 12250'. Wiper trip to above LTP to 10375'. Dry drift to PBTD at 12856'. Currently POOH. ...In Progress... 7/3/2021 CTU 9, 1.75" CT - 32.0bbl, Job Objective: Addperf Continue to POOH with 2.30" milling BHA. RIH with HES GR/CCL in 2.20" carrier with 2.25" DJN. Bobble through obstruction at 11,720'. Tag PBTD at 12858'. Log OOH at 50fpm. Have good log data with a -3' correction. Make up and RIH with 2" HES 6spf Maxforce perf gun and perforate 12551-12582, Reference log BKR MWD 10/6/2019. POOH and got hung up at 11958. Got free POOH. RIH with 2.28" Venturi and venturi down to tag at 11833' (deepest perf target is 11620'). Currently PUH for dry drift. ...In Progress... 7/4/2021 CTU 9, 1.75" CT - 32.0bbl, Job Objective: Addperf Dry drift from 10390' to tag at 11834' with 2.28" Venturi Junk Basket. OOH with venturi and muleshoe left in hole. Muleshoe: 2.30" x 0.7' . Make up and RIH with 2.29" 4-blade junk mill. Tagged muleshoe at 11830 and milled/pushed to PBTD. Dry drift from above LTP. Correct depth at PBTD and paint red flag at 11299.9. Corrected EOP at flag 11280.84'. POOH. Currently swapping BOPs. ...In Progress... 7/5/2021 CTU 9, 1.75" CT - 32.0bbl, Job Objective: Addperf Finish BOP swap and test. Perforate 11590' - 11621' (reference log Baker MWD 10/6/19). Bullhead kill well while POOH. Make up and RIH with extended adperf. Perforate 11150-11212 and 11379-11410 with HES 2" 6spf Maxforce - Reference log Baker MWD 10/6/19. POOH. Undeploy extended perforating string. Begin RD. ...In Progress... 7/6/2021 CTU 9, 1.75" CT - 31.9bbl, Job Objective: Addperf RDMO. ***Job Complete*** Daily Report of Well Operations PBU 14-38A Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:219-088 6.API Number:50-029-21862-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: Property Designation (Lease Number): 10. 8. PBU 14-38A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations …Fracture Stimulate …Repair Well … Operations shutdown CTU Extended Addperf … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 12872 Effective Depth MD: L-80 11. 6/1/2021 Commission Representative: 15. Suspended … Contact Name: Ryan Thompson Contact Email: Ryan.Thompson@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 9026 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill …Perforate …Perforate New Pool 10347 , 8644 Date: Liner 2456 3-1/2" x 3-1/4" x 2-7/8" 10416 - 12872 8696 - 9026 10570 11160 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 34 - 3480 34 - 3480 14. Estimated Date for Commencing Operations: BOP Sketch 34 - 114 Structural 6870 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker SB-3A HYD PERM PKR 11436 - 12551 8966 - 8982 4-1/2" L-80 30 - 10465 Production 12857 none none 34 - 114 470 13-3/8" 9-5/8" Contact Phone:(907)564-5280 Date: 5/14/21 4760 80 149020"Conductor 2670 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 3446 4930 Intermediate 10675 32 - 10707 32 - 8923 338 7"10394 - 10732 8679 - 8943 8160 7020 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2502 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. ADL 028312 , 028314 , 047475 9026 By Meredith Guhl at 12:37 pm, May 17, 2021 321-241 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.05.17 11:02:00 -08'00' Bo York MGR28MAY21 DLB05/17/2021 10-404X DSR-5/18/21  dts 6/4/2021 JLC 6/4/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.06.04 10:30:03 -08'00' RBDMS HEW 6/4/2021 X Extended Add Perf 14-38A PTD: 219-088 Well Name:14-38A API Number:500292186201 Current Status:Flowing Rig:CTU & Surface Deployed TCP Guns Estimated Start Date:6/1/21 Estimated Duration:2 Days Regulatory Contact:Carrie Janowski Permit to Drill Number:219-088 First Call Engineer:Ryan Thompson 907-564-5280 / 907-301-1240 Second Call Engineer:Dave Bjork 907-564-4672 / 907-440-0331 AFE Number:202-04015.08.02 IOR 100 Current Bottom Hole Pressure:3382 psi @ 8,800’ TVD 7.4 PPGE | 11/1/15 Max. Anticipated Surface Pressure:2502 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:1100 psi (Taken on 3/22/20) Min ID:2.31” ID @ 10431’ MD Max Angle:102° Deg @ 11,010’ MD Brief Well Summary: 14-38A is a CTD sidetrack from October 2019. The well has been a fulltime producer but has relatively low gross fluid rates. Objective: The objective of this program is to add additional perforations in the horizontal of the well to bring in more rate. Cerberus Modelling suggests making TD with ~471’ of 2” guns w/ 1.75” coil tubing. Extended Add Perf 14-38A PTD: 219-088 Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. MU and RIH with GR/CCL logging tools and ~2.2” nozzle. Pull jewelry log for tie in. 3. POOH and confirm good data. 4. Contact OE prior to perforating for final approval of tie-ins. 5. Perform gun run #1 shooting 31’ interval from 12,550 – 12,581’. 6. Bullhead kill the well w/ ~255 bbls of 8.4 ppg 1% KCl or 8.5 ppg seawater. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perfs = ~170 bbls 7. Freeze protect tubing as needed. Prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 9. Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. Extended perforating will include perf depths between 11,149’ – 11,620’. 14-38A Add perf Schedule ***There is a 1’ shift from reference log to Tie in Log. Reference log depths will be noted on schematic*** Assure fluid level remains at surface in tubing. If circulating across the top of the well, assure no excess flow. * Extended Add Perf 14-38A PTD: 219-088 11. RIH with perf gun and tie-in. Pickup and perforate intervals per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well is dead and hole is full. 13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 14. RDMO CTU. 15. RTP or FP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet * See note above regarding kill methods if pressure observed at surface after perforating. Make up coil tubing PCE and stab injector onto well. Standing orders flow chart included with this sundry request. Extended Add Perf 14-38A PTD: 219-088 As-built Schematic Extended Add Perf 14-38A PTD: 219-088 Proposed Schematic Extended Add Perf 14-38A PTD: 219-088 Coiled Tubing BOPs Extended Add Perf 14-38A PTD: 219-088 Equipment Layout Diagram Extended Add Perf 14-38A PTD: 219-088 Standing Orders for Open Hole Well Control during Perf Gun Deployment Standing Orders for Service Coiled Tubing Operations While Deploying Extended Length Perforating BHA WELL BEGINS FLOWING DURING OPEN HOLE DEPLOYMENT Pull BHA above blind/shear rams, and close blind/shears. Space out BHA with safety joint above slip bowl, set hand slips Install safety joint with open TIW Can BHA be pulled above blind/shear rams in a single pick? Pull hand slips YES NO Begin Notifications Close Upper Pipe/Slip Ram Close TIW Close choke valves, monitor and record SIWHP Close choke line. Monitor and record SIWHP Lower safety joint and space out over BOP, set hand slips Begin Notifications Extended Add Perf 14-38A PTD: 219-088 Tie-In Log DATA SUBMITTAL COMPLIANCE REPORT 1/3112020 Permit to Drill 2190880 Well Name/No. PRUDHOE BAY UNIT 14-38A Operator BP Exploration (Alaska) Inc. MD 12872 TVD 9026 REQUIRED INFORMATION Completion Date 10/27/2019 Completion Status 1-0IL Mud Log No V/ DATA INFORMATION List of Logs Obtained: MWD/GR/RES Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data ED C 31421 Digital Data AOGCC Samples No✓ Current Status 1 -OIL API No. 50-029-21862-01-00 UIC No Directional Survey Yes J (from Master Well Data/Logs) Log Log Run Interval OH I Scale Media No Start Stop CH Received Comments 10554 12872 11/8/2019 Electronic Data Set, Filename: 14- 38A_LWD_FINAL FIELD_COMPOSITE_07OCT 2019_BHI_CTK.las 11/8/2019 Electronic File: 14- 38A_GR_Res _ 070CT2019_MD_FINAL_FIELD_ BHI_CTK.ogm 11/8/2019 Electronic File: 14- 38A GR Res_ 070CT2019_TVDSS_FINAL_FlEL D_BHI_CTK.cgm 11/8/2019 Electronic File: 14- 38A_GR_Res _ 070CT2019_MD_FINAL_FIELD_ BHI_CTK.pdf 11/8/2019 Electronic File: 14- 38A_GR_Res _ 070CT2019_TVDSS_FINAL_FIEL D_BHI_CTK.pdf 11/8/2019 Electronic File: 14-38A Final Surveys.csv 11/8/2019 Electronic File: 14-38A Final Surveys.pdf 11/8/2019 Electronic File: 14-38A Final Surveys.txt 11/8/2019 Electronic File: 14-38A Final Surveys.Asx 11/8/2019 Electronic File: 14- 38A_25_tapescan_BHI CTK.txt 11/8/2019 Electronic File: 14-38A_5_ tapescan_BHI_CTK.txt 11/8/2019 Electronic File: 14-38A_output.tap 11/8/2019 Electronic File: 14- 38A_GR_Res _ 07OCT2019_MD_FINAL_FIELD_ BHI_CTK.tif Page I of Friday, January 31, 20201 DATA SUBMITTAL COMPLIANCE REPORT 1/3112020 Permit to Drill 2190880 Well Name/No. PRUDHOE BAY UNIT 1438A MD 12872 TVD 9026 Completion Date 10/27/2019 ED C 31421 Digital Data Log 31421 Log Header Scans Well Cores/Samples Information: Operator BP Exploration (Alaska) Inc. API No. 50-029-21862-01-00 Completion Status 1 -OIL Current Status 1-0I1- UIC No 11/8/2019 Electronic File: 14- 38A_GR_Res _ 070CT2019_TVDSS_FINAL_FIEL D_BHI_CTK.tif 0 0 2190880 PRUDHOE BAY UNIT 14-38A LOG HEADERS COMPLIANCE HISTORY Completion Date: 10/27/2019 Release Date: 6/13/2019 Description Date Comments Comments: --- --- — Compliance Reviewed By: Date: A00 ( Page 2 of 2 Friday, January 31, 2020 Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report YO Directional / Inclination Data O Mud Logs, Image Files, Digital Data Y / lTJ Core Chips Y /O Production Test InformatiorQT NA Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Core Photographs Y I Geologic Markers/Tops YO Daily Operations Summary DY Cuttings Samples Y/6 Laboratory Analyses Y / A COMPLIANCE HISTORY Completion Date: 10/27/2019 Release Date: 6/13/2019 Description Date Comments Comments: --- --- — Compliance Reviewed By: Date: A00 ( Page 2 of 2 Friday, January 31, 2020 RECEIVED Nnv 7 1 ma WELL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISR"N IMPLETION OR RECOMPLETION REPO AND LOG 1a. Well Status: Oil 21 Gas ❑ SPLUG ❑ Other Abandoned ❑ Suspended ❑ 1b. Well Class: /� (� 20AAC 25.105 20AAC 25.110 GINJ ❑ A0GrzC WAG EllWDSPL ❑ No. of Completions: One Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Camp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 10/27/2019 219-088 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 9951"612 10/3/2019 50-029.21862-01-00 4a. Location of Well (Governmental Section): e. Date TO Reached 16. Well Name and Number: 10/8/2019 PBU 14-38A 9 Ref Elevations KB 74.00 17. Field/Pool(s): Surface: 2421' FNL, 1623' FEL, Sec. 09, T10N, R14E, UM Top of Productive Interval: 5213' FNL, 5146' FEL, Sec. 09, T10N, R14E, UM . GL 40.06 . BF 43.01 ' PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Properly Designation: Total Depth: 1342' FNL, 1295' FEL, Sec. 17, T10N, R14E, UM 12857'19022' ADL 028312 028314 8 047475 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number Surface: x- 674879 y- 5937911 - Zone - ASP 4 12872'/ 9026' • 77-043 TPI: x- 671428 y- 5935039 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20Thickness of Permafrost MDrFVD: Total Depth: x- 670036 y- 5933599 Zone - ASP 4 None 1900' (Approx.) , 5. Directional or Inclination Survey: Yes ® (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/rVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 10732'/ 8943' ' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MND/GR/RES 23' CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# R-xo 34' 114' 34' 114' 30" 21500 Poleset 13-318" 68#/72# K -65/L-80 34- 3480• 34' 3480' 17-112" 2000 sx CS III, 600 sx Class'G', 175 sx CS II 9-5/8" 47# 1410 32' 10707' 32' 8923' 12-1/4" 880 sx Class'G' 7" 29# L -w 10394' 10732' 8679' 8943' 8-1/2" 257 sx Class'G' 3-1/2'x3-1/4" 9.3#/6.6# 1 12- 1 10416' 12872' 8696' 9026' 1 4-1/8" 137 sx Class'G' x2-7/8" 16.5# 24. Open to production or injection? Yes El No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/IVD of Top and Bottom; Perforation Size and Number, Date Perttl): I GRADE DEPTH SET (MD) PACKER SET (MD/ry 4-1/Z'12,6# L-80 10465' 10347-18644' Z' Gun Diameter, 6 spf 10/25/19 - 10/27/19 11436'- 11467' 8966'- 8964' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11660'- 11750' 8962' - 8966' , Was hydraulicfracluring used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed 12314'-12374' 8979' - 8974' 12520'- 12551' 8978' - 8982' COMPLEMN DATE I information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 10 L2 zom VERIFIED ow 2500' Freeze Protect w/38 Bois Diesel 27. PRODUCTION TEST Date First Production: November 7, 2019 Method of Operation (Flowing, gas lm, etc.): Gas Lift Date of Test: 11/8/19 Hours Tested: Prodction for Oil -Bbl: Gas -MCF: Waler-8b1: Choke Size Gas -Oil Ratio' 3 Test Pedod -111-96 294 135 85 3070 Flow Tubing 260 Press Casino Press: 1180 Calculated 24 Hour Rale -..1- Oil -Bbl: 767 Gas -MCF: 2354 Water -Bbl: 1083 Oil Gravity - API(oorl: N/A Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only g+�a i/ � �z6n1a•'�� RBDMSIL2 NOV 2 2 2019 Gr 28. CORE DATA Conventional Core(s) Yes ❑ No 0 1 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize ethology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 10725' 8937' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sadlerochit - Zone 4 10725' 8937' Kicked off from Parent Well 10732' 8943' Shublik (Invert) 12378' 8973' r Zone 4 (Revert) 12521' 8978' Formation at total depth. Zone 4 1 12521' 1 8978' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Hyatt, Trevor Authorized Title: M ecialist Contact Email: Trevor.Hyatt@bp.cem Authorized Signature: Data: C�• rl 1 Contact Phone: +1 907 564 4627 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 welt sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the comesponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory infomration required by 20 AAC 25.071, Item 31. Pursuant to 20 AAC 25.070, attach to this form', well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production orwell test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only TRFF = WELLHEAD= FMC ACTUATOR= SH 3000 KB. ELEV = 74' BF. ELEV = 43.01' KOP = 4024' Max Angle = 102-011011- 02" 11011'Datun DakinMD = 10645' Datum TVD = 8800' SS 133/8' CSG, 68#, K-55, D = 12.415• h. 68' 13-3/8' CSG, 72#, L-80, ID = 12.347• 348W Minimum ID = 2.313" @ 10431' 2-7/8•' X NIP IN LTP w/ PTSA ITOPOF7'LNR I TOP OF 3 -12"X3 -114"X2-79" LNR 19-5/8" CSG. 47#. L-80. D = 8.681' I 112' LNR, 93#,13CR-85 STL, - 10710• 087 bpf, D = 2.992' 2"X7- DELTA WHIPSTOCK(08/05119) 10726' 7 LNR, 29#, L-00, .0371 bpf, ID =6.184" �10726• 14-38A 6.6#, 13CR-85 TCII, .0079 bpf, ID = 2.85" -t__11225- PERFORATION 11225• PBTD 1285T 2-7/8' LNR, 6.5#,13CR-85 STL, 12872' .0058 bpf, D = 2.441" l_J FETY NOTES: WAIVERED WELL. T X IA MMUNICATION. WELL ANGLE > 70° 10862'. MAX DLS: 40.7'@ 10832'. CHROME LNR F98ET, iol0LTA r71r7A7iCal V/S71P_1 LN:IIS*]a 1E V:\1:01 2 PERFORATION SUMMARY 4202 17 REF LOG: BKR MWD ON 10/06/19 I DMY I P"0 ANGLE ATTOP PERF: 93' @ 11436' 06/06/92 Note: Refer to Produddon DB for tistoriwl rfdata SIZE SPF INTERVAL I OprjSqz I DATE 2' 6 11436-11467 O 1027119 2' 6 11660-11750 O 1027119 2' 6 12314 -12374 O 1026119 2' 6 12520 -12551 O 1025119 PBTD 1285T 2-7/8' LNR, 6.5#,13CR-85 STL, 12872' .0058 bpf, D = 2.441" l_J FETY NOTES: WAIVERED WELL. T X IA MMUNICATION. WELL ANGLE > 70° 10862'. MAX DLS: 40.7'@ 10832'. CHROME LNR F98ET, iol0LTA r71r7A7iCal V/S71P_1 LN:IIS*]a 1E V:\1:01 2 4213 4202 17 MC-FMHO I DMY I P"0 ORIGINAL COMPLETION 06/06/92 3 5122 4982 42 MC-FMHO SO RK 22 11/07/19 4 6062 5666 43 MC-FMHO D RK 0 11/02/15 5 7054 6383 45 MC-FMHO DMY RK 0 11/02/15 6 7939 6997 46 MC-FMHO DMY RK 0 10/19/93 7 8827 7592 48 MC-FMHO DMY RK 0 06/06/92 8 10031 8464 42 MC-FMHO •DMY RK 0 02/04/90 V]9W Tr7111-07fiTATAi ki l;11111111&9IVAIVA 117;1104;ci8■43 IM'. "STA #4, #9 & 910 = EXTENDED PACKING 19-5/8" X 4-1/2' BAKER DB PKR I 1041W -145 BKR FLOGARD LTP WINS 10428' 3.70" DEPLOY SLV, ID=3.00' 10431• 2-79"X NIP, IIT=2.313' 10453• 3-1/2'X MP, ID = 2.813' 10454•4-12' OTIS XN NIP, ID =3.725' 10465• 4-12' RAKER SHEAROUTSUB { 10466• - 4-12• WL , D = _• 10447R MD TT LOGGED 06/04/92 10710• -j112-X3-1/4-XO,ID=2.786" MILLOUT WINDOW (14-38A)10732'-10738' 13-3/16"X 2-718" XO, ID = 2.377" 11971' -j2-7/8" PUP JTw/RA RAG DATE REV BY COMMENTS DATE REV BY COMMENTS 102688 ORIGINAL COMPLETION 10/29/19 TA/JMD INITIAL PERFS 0210590 LAST WORKOVER 11112/19 TJSIJMD SET LTP wl PTSA 8 X NP 18MOM9 NCDR2 CTD SIDETRACK 1438A 11/12119 TJS/JMD GLV C/O 11/07/19 10/14/19 KP/JMD TREE C/O 1121119 JNLUMD ADDED BF ELEV 10115/19 JMD DRLG HO CORRECTIONS 10115/19 TWJMD FINAL ODE APPROVAL PRUDHOE BAY UNIT WELL: 1438A PERMIT No: 219-088 API No: 50-029-21862-01 BP Exploration (Alaska) North America - ALASKA - BP Operation Summary Report Page 1 of 10 Common Weft Name: 14-38 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/25/2019 End Date. H-S4DW0019GV-EX-DI-RN- (2,044,244 00 ) Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Date/rime: 10/4/1968 12:00:OOAM Rig Release: Active datum: KB @7.4.00usR (above Mean Sea Date From - To His (hr) 9/25/2019 20:00 - 0000 4.00 Task Code NPT Total Depth Phase Description of Operations (usft) RIGU N 9/26/2019 00:00 - 05:00 5.00 RIGU N 0500 - 0000 19.00 RIGU N 9/27/2019 00.00 - 05:00 5.00 0500 - 0000 1900. RIGU N RIGU N 9/282019 00:00 - 05:00 5.00 RIGU N f11111CU 11/LV/LV IC 9.IJ.JLfM PRE RIG MAINTENENCE WHILE WAITING ON RIG MATS FOR MOVE -REPLACING DRAG CHAIN ASSEMBLY INCLUDING DRIVES '-CHECK ACCUMULATOR BOTTLES PRE RIG MAINTENENCE WHILE WAITING ON RIG MATS FOR MOVE -REPLACING DRAG CHAIN ASSEMBLY INCLUDING DRIVES -SPOT STOMPER FOOT FOR RIG MOVE -BLOW DOWN WATER LINES GREASING ALL ROMEO VALVES PRE CONTINUE WITH DRAG CHAIN MAINTENANCE. - REMOVE WSL LOCKS FROM L3-15 AND LPC -02. INSTALL LOCKS ON WELL 14-17AAND X-23. - CHANGE OUT FLAME UNIT ON BOILER - CHARGE ACCUMULATOR BOTTLES ON INJECTOR - CALIBRATED LEL SENSOR IN PITS -CHANGED SWABS, SEATS AND VALVES ON PUMP#1 - CHANGED OUT PRV ON BOP ACCUMULATORS AND AIR SYSTEM -CONTINUED REBUILDING DRAG CHAIN CHANGED OUT 3 VALVES IN PITS. PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE -REPLACING DRAG CHAIN ASSEMBLY -WORK ON PROCEDURES FOR UPCOMING WORKOVERS -CHANGE OIL IN AGITATORS -CLOSE LOUVERS FOR WINTER SEASON PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE - SERVICE OFF DRILLER SIDE TIOGA - CHANGE OIL ON AGITATORS - FINISH DRAG CHAIN - CLEAN UP UFD / MCC CABINETS IN PIT MODULE - SERVICE BOILER #1 - COMPLETE WORK ORDERS - INSTALL PLUMBING ON WATER FILTER FOR HOTWELL -HOUSEKEEPING NOTE:HOLD SPILL DRILL WITH RICK ROYS CREW, SIMULATED SPILLAT FUELING STATION. CREW RESPONSE TIME 1 MINUTE 32 SECONDS. PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE -SERVICE AND INSPECT LUBRICATORS -PLUMB HOT WELL FILTRATION SYSTEM -WORK ON PROCEDURES FOR UPCOMING WORKOVER CAMPAIGN. North America -ALASKA - BP Operation Summary Report Page 2 of 10 Common Well Name: 14-38 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/25/2019 End Date. H-S4DW0019GV-EX-DI-RN-(2,044.244.00) Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Daterrime: 10/4/1988 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI. USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (h0 _ Waft) 05:00 - 00:00 1900.RIGU N PRE RIG MAINTENANCE WHILE WAITING ON RIG 9/29/2019 00:00 - 05:00 5.00 RIGU N N 0500 - 00.00 1900. RIGU N 9/30/2019 0000 - 0500 5.00 RIGU N 0000 19.00 RIGU N 0500 10/1/2019 0000 - 21:00 21.00 RIGU N MATS FOR MOVE -CLEAN SUB VFD/MCC - SERVICE SKATE - TAKE OIL SAMPLES -PUT 2-5/8" ROLLERS IN SPARE GOOSENECK - WORK ON PROCEDURES FOR UPCOMING WORKOVER CAMPAIGN. - TAKE TOOL INVENTORY - GENERAL HOUSEKEEPING PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE -GENERAL HOUSEKEEPING -INSPECT ACCUMULATOR LINES AND HOSES '-WORK ON PROCEDURES FOR UPCOMING WORKOVER CAMPAIGN PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE - CHANGE OUT PRV ON TEST PUMP - REBUILD VALVE P9 - CONTINUE REVIEWING AND UPDATING RAO PROCEDURES - DO WALKDOWN ON 01-23A - CONTINUE RIG HOUSEKEEPING - SERVICE REELAND LEVEL WIND PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE - GENERAL HOUSEKEEPING - INSTALL NEW BOILER CHEMICAL INJECTION PUMP - WORK ON COMMAND AND CONTROL CHECKLIST FOR UPCOMING WORKOVER I _CAMPAIGN PRE RIG MAINTENANCE WHILE WAITING ON RIG MATS FOR MOVE - FIT TEST 13-5/8" ANNULAR TO LIFTING CRADLE - WORK ON RWO PROCEDURES - CONTINUE HOUSEKEEPING - CHANGE OUT 2 MORE VALVES IN PITS - COMPLETE WORK ORDERS - CHANGE OUT SUCTION GASKETS ON PUMPS - CLEAN OPS CAB AND PAINT FLOOR - LOCATE EQUIPMENTAT NOC FOR UPCOMING WORKOVER CAMPAIGN PRE PERFORM RIG MAINTENANCE WHILE WAITING ON RIG MATS TO BE SPOTTED FOR RIG MOVE - METAL ENGRAVED TAGS FOR NEW BOPS FOR UPCOMING WORKOVER CAMPAIGN - HOUSE KEEPING - REVIEW PROCEDURES FOR UPCOMING RWO. -PAINTING FLOORS AND RIG EQUIPMENT. North America - ALASKA - SP Page 3 of 10 Operation Summary Report Common Well Name. 14-38 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/25/2019 End Cate Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1988 12:00.00AM Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth __ _ (hr) (usft) 21:00 - 2300 2.00 RIGU P 2300 - 0000 1.00 RIGU P 10/2/2019 0000 - 0300 3.00 RIGU P 03:00 - 13:00 10.00 RIGU P 13-.00 - 17.30 4.50 nerzea 1 "zvlzu ie qas: nnnh RIGU N AFE No (2,044,244.00 ) BPUOI'. USA00000836 Phase Description of Operations PRE MOVE RIG OFF 1.2-08 - PRE JOB SAFETY MEETING WITH CREW AND TRUCK DRIVERS. - EMPHASIS ON GOOD COMMUNICATION, VERIFY STOP COMMAND. - STOP BLOCK IN PLACE TO PREVENT RIG FROM ROLLING BACKWARDS INTO WELL. TREE & CASING VALVES ON TREE SHUT IN. IA,OAAND PRESSURES= OHO PSI -DRILL SITE OPERATOR NOTIFIED AND DECLINED WITNESSING RIG MOVE OFF OF WELL. -MOVE RIG MODULE OFF WELL WITH WALKING FOOT. '- MOVE PITS AND RIG MODULE OFF WELL D _INSTALLJEEPS _ PRE MOVE RIG FROM L2 PAD TO DS 14 - MOVE RIG FROM L2 TO DS 18 ACCESS ROAD PRE MOVE RIG FROM L2 PAD TO DS 14 -MOVE RIG FROM WEST DOCK ROAD TO SPINE ROAD AT 0200 HRS -MOVE RIG FROM SPINE ROAD TO DS 14 AT 0300 HRS PRE MOVE RIG OVER TO 14-38A. -SPOT DRILLING SUB OVER WELL WITH WALKING FOOT. - SPOT PIT MODULE NEXT TO DRILLING SUB AND SET DOWN. -ACCEPT RIG AT 07:30. - COMPLETE RIG UP CHECKLISTS. - PJSM AND REVIEW PROCEDURE FOR LTT OF TREE VALVES. - GOOD LTT, LOTO MV 1 & 2, NO TREE CAP AND NU BOPE - BOP NU, MOVE INJECTOR OVER TO THE WELL - INJECTOR GOOSENECK SUPPORT IS BROKEN AND WILL NEED TO BE REPLACED -TEST H2S/LELGASALARMS S/10 PPM, 5/ 40% GOOD TEST PRE INJECTOR REPAIR - DRAFT UP PLAN TO SUPPORT THE GOOSENECK WITH PDL WINCHES WHILE MOVING THE CART OR MOVING COIL UP OR DOWN - PLAN APPROVED BY NAD MANAGER AND REVIEWED BY WSL& WSUPT EXECUTE APPROVED PLAN AS WRITTEN TO SUPPORT GOOSENECK -ATTACH PDL WINCH LINES TO THE GOOSENECK - MOVE CART BACK WHILE SLACKING OFF PDL WINCHES - CART MOVED, RUN COIL DOWN AND REMOVE BHI EQUIPMENT - CUT COIL AND PREP FOR GRAPPLE - INSTALL GRAPPLE, PULL TEST AND UNSTAB PIPE North America - ALASKA- BP Operation Summary Report Page 4 of 10 Common Well Name: 14-38 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/25/2019 End Date: H-S4DW0019GV-EX-Di-RN-(2,044,244.00) Project: PBU Site: 14 (hr) Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1988 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From - To ! Hm Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 17:30 - 23:00 1 5.50 RIGU N PRE SWAP OUT GOOSENECKASSEMBLIES I - HOLD PJSM WITH CREW FOR DISCONNECTING GOOSNECKAND REMOVAL WITH CRANE - DISCONNECT GOOSENECKAND REMOVE FROM RIG WITH CRANE -SWAP ROLLERSTONEWGOOSNECKAND PREP TO LIFT WITH CRANE. - LIFT NEW GOOSENECK INTO POSITION AND SECURE TO INJECTOR -STAB PIPE - INSTALL COIL CONNECTOR AND PULL TEST TO 50K - INSTALL UQC WITH NO FLOATS 23:00 - 0000 1.00 RIGU P PRE PREPARE FOR BORE TEST -M/U INJECTOR -DISPLACE COILAND SURFACE LINES TO FRESH WATER -VALVE SHOP OUT TO GREASE T1, T2, SWAB, _ AND CHECK TORQUE ON TREE FLANGES 10/3/2019 00:00 - 02:30 250 RIGU P PRE PREPARE FOR BOPE TEST - DISPLACE COIL AND SURFACE LINES TO FRESH WATER - VALVE SHOP OUT TO GREASE T1, T2, SWAB, AND CHECK TORQUE ON TREE FLANGES - SHELL TEST BOPS TO 250/3500 PSI FOR 5 MINUTES EACH -GOOD TEST 02:30 - 03:30 1.00 RIGU P PRE INITIAL BOPE TEST PER BP AND AOGCC STANDARD. WITNESS WAIVED BYAOGCC ADAM EARL - 7-1/16" ANNULAR, BLIND/ SHEAR, 2-3/8" PIPE / SLIP, MUD X, 2-3/8" x 3-1/7' VARIABLE, 2-3/8" PIPE / SLIP - ALL TESTS 250 PSI LOW 13500 PSI HIGH FOR 5 MIN EACH - TEST 1: IRV, RACKOFF, C9 BACKWARD, CW BACKWARD PASS 0330 - 0700 3.50 RIGU N PRE -TEST 2: MASTER, BLIND/ SHEAR, RI, BLIA, 61, B4 FAIL -GREASE R1 8 Bt - FAIL, GOOD LOW PT'S BUT SLOW BLEED OFFS DURING HIGH TROUBLE SHOOT TEST 2, OPEN BLIND SHEARS AND TEST AGAINST NIGHT CAP. - TEST 2: RETEST, LOW PT PRESSURE IS NOW CLIMBING CALL OUT GREASE CREW, BLEED OFF AND TRY AGAIN, PRESSURE INCREASING SUSPECT MASTER VALVE 1 8 2 ARE LEAKING - SERVICE UPPER MV R2 Printed 11/20/2019 4:13:32PM North America - ALASKA - BP Operation Summary Report Page 5 of 10 Common Well Name: 14-38 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/25/2019 End Date: H-S4DW0019GV-EX-01-RN- (2,044,244=) Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Daterrime: 10/4/1988 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) __ _ 07:00 - 12:30 5.50 RIGU P PRE TEST 2 RETEST: LOW PT IS GOOD GO TO HIGH, SLOW BLEED OFF BUMP UPAND STABILIZED - TEST 2: MASTER, BLIND / SHEAR, R1, BOA, B1, B4 -PASS - TEST 3: ANNULAR (2-3/8"), TIW#1, B3, B2, BL1 - PASS '- TEST 5: C16, T1, C11 -PASS - TEST 4: UPPER 2-3/8" PIPE / SLIP, TIW#2, BL2, R2, T2, C15 - PASS - TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 - PASS - TEST 7: LOWER 2-3/8" PIPE/ SLIP, CS, C6, C8, TV1-PASS - TEST 8: CHOKE A, CHOKE C - PASS - PERFORM ACCUMULATOR DRAW DOWN TEST - TEST 9: ANNULAR (3-1/2"), C1, C4 - PASS - TEST 10: _VARIABLE (3-1/2")C2,C_3-PASS 12:30 - 18:45 6.25 RIGU P PRE PREP FOR WELL KILL OPS '- RD TEST EOUIPMENTAND LUBRICATOR - RU DRILLING LUBRICATOR - INSTALL BHI FLOATS - RU BLEED HOSE FOR IA & OA PRESSURES -STAB INJECTOR ON STACK AND PT LUBRICATOR, OTS AND FLOATS - GOOD PT, LINE UP MPD LINE, PUMP NEAT METH TO THE OUT MM, CLOSE CHOKE AND PRESSURE UP TO 1000 PSI - CLOSE THE SWAB, UNLOCKAND OPEN MVS i & 2, WHP = 132 PSI -ONLINE WITH 10 BELS OF NEAT METH, 290 BBLS OF 1% KCL, 40 BBLS 160K HVPAND 174 BBLS OF MUD - IN RATE = 5.2 BPM AT 123 PSI INTIAL / 1945 PSI FINAL - SSSV = 725 PSI, IAP = 0 PSI, OAP = 0 PSI - MU BUILD BHA - SHUT DOWN PUMP WITH 5 BBLS OF HVP ABOVE THE TOP PERF - MONITOR WELL THROUGH MPD LINE, MAX WHP DURING KILL 1945 PSI - LINE UP TO DISPLACE THE COIL OVER TO MUD TAKING RETURNS OUT TO THE TT -OPEN SWAB AND PURGE INJECTOR TO TIGER TANK - 10 MINUTE FLOW CHECKAT ROTARY -STATIC - BREAK OF INJECTOR AND REMOVE NOZZLE -INJECTOR OFF@ 1845 1845 - 1915 0.50 DRILL P 10,741.00 PRODi MU BUILD BHA - PJSM - MU BUILD BHA - INJECTOR ON @ 1900 HRS - PT OTS TO 3500# Printed 11/20/2019 4:13.32PM Common Well Name: 14-38 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA- BP Page 6 of 10 Operation Summary Report Start Date. 9/25/2019 End Date. Site: 14 Spud Datef ime: 10/4/1988 12:00 OOAM AFE No 9GV-EX-Dl-RN- (2,G44,244 00 ) Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. Active datum, KB @74.00usft (above Mean Sea Level) BPU01: USA00000836 Date From - To Him Task Code NET Total Depth Phase Description of Operations (hr) _ (usft) 19 15 - 2245 3.50 DRILL P 10,741.00 PROD1 RIH WITH 4-1/8°BUILD BHA#1 - RATE: 0.8 BPM IN, 0.98 BPM OUT. CIRC PRESSURE: 974 PSI - MUD WEIGHT: 8.71 PPG IN, 8.7 PPG OUT - LOG DOWN FOR TIE-IN FROM10620' TO 10668' MD (FORMATION) WITH -30' CORRECTION CLOSE EDC - RIH-AND TAG AT 10741' 22.45 - 00'.00 1.25 DRILL P 10,761.00 PROD1 DRILL 4-1/8" BUILD FROM 10741' TO 10761' - FREE SPIN: 3071 PSI, 2.80 BPM - RATE: 2.7 BPM IN, 2..1 BPM OUT. CIRC PRESSURE 2900 - 3000PSI - MUD WEIGHT: 8.77 PPG IN, 8.59 PPG OUT, ECD: 10.00 PPG AT WINDOW - ROP: 20 FT/HR, WOB 0.5 - 1.0 KLBS 10/4/2019 00:00 - 03'.30 3.50 DRILL P 10.980.00 PROD1 DRILL 4-1/8°BUILD FROM 1076VTO 10980' - FREE SPIN: 3071 PSI, 2.80 BPM - RATE: 2.75 BPM IN, 2..2 BPM OUT. CIRC PRESSURE 3100 - 320OPSI - MUD WEIGHT: 8.77 PPG IN, 8.63 PPG OUT, ECD: 10.00 PPG AT WINDOW - ROP: 20- FT/HR, WOB 1.0 - 2 KLBS '- PUMP 5X5BBLAT TD OF BUILD SECTION NOTE: AT 10825 ENCOUNTER LOSS ZONE LOSING AT 1.3 BPM INITIAL -DISCUSS WITH ODE, START TO HEAL UP IMMEDIATELY, LOSING AT 0.35 BPM AT TD OF BUILD SECTION NOTE: WIPER TRIP FROM 10918'-10750' 03:30 - 10:45 7.25 DRILL P 10,980.00 PROD1 TRIPPING OPS FOR LATERAL BHA POOH TO THE WINDOW -OPEN EDC PUMP 10X10 BBL LO/HI VIS SWEEP WHILE POOH INCREASING PUMP RATE TO 4 BPM MAINTIAINING 0.35 BPM LOSS RATE AT 4 BPM AT 9400' -FLOW CHECK WE LL- LOST 28 BBLS ON THE TOOH -GOOD NO FLOW, PU THE INJECTOR AND TAG UP INJECTOR OFF AT 06:45 - LD THE BHA, BIT GRADE = 1-1 -INJECTOR ON AT 07:15, NABORS IS ADJUSTING THE INJECTOR SHIMS BEFORE RIH - RIH - LOG TIE IN, CORRECT -31', RIH - TAG AT 10747', PU AND ROLL PUMP AT 0.4 BPM, RAN PAST CLEAN 1045 - 1700 625 DRILL P 11.450.00 PROD1 DRILL 4-1/8" LATERAL SECTION FROM 10980' TO 11450' - FREE SPIN: 3066 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.75 BPM OUT. CIRC PRESSURE 3066-3300 PSI - MUD WEIGHT: 8.81 PPG IN, 8.78 PPG OUT, ECD: 10.16 PPG AT WINDOW - ROP: 70-120 FT/HR, WOB 1.0 - 2.5 KLBS Printed 11/20/2019 4:13:32PM Common Well Name: 14-38 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Page 7 of 10 Operation Summary Report Start Date: 9/25/2019 Eno Date. Site: 14 AFE No 9GV-EX-Di-RN- (2,044,244.00 ) Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 1700 - 2030 3.50 DRILL P 11,450.00 PROD? WIPER TRIP 20:30 - 00'.00 3.50 DRILL P - -� 11,609.00 10/5/2019 00:00 - 0600 6.00 DRILL P 06.00 - 08 45 2 75 DRILL P Printed 11/20/2019 4:13:32PM 11,860.00 11,900 00 - DRILLED 450', PULL WIPER TO THE WINDOW CHASING PILLSAND TIE IN -OPEN EDCATWINDOW. JETTRAYAT3.5 BPM. - 10X10 BBL LO/HI VIS SWEEP - LOG DOWN FOR TIE-IN FROM 10645'to 10669'(FORMATION) WITH +3' CORRECTION - PULL UP HOLE AND PERFORM CCL LOG FROM 10100-10600' -RIH - CLOSE EDC. RIH AT MINIMUM RATE. SET DOWN AT 10738' VERIFY AS DRILLED. HAD TO BRING PUMP RATE UP TO 1 BPM. - DROP RATE TO MINIMUM. SET DOWN AT 9289' MULTIPLE TIME. HAD TO BRING TO DRILLING RATE TO MAKE IT THROUGH. -INCREASE ECD TO 10.3 PPG AT WINDOW -TAG AT 10747', PU AND ROLL PUMPSAT 0.5 AND 1.0 BPM WITH NO SUCCESS. PUMPS OFF AND RUN THROUGH AT 30 FPM CLEAN PROD1 DRILL4-1/8" LATERALSECTION FROM 11450' TO 11609 - FREE SPIN: 3035 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.91 BPM OUT. CIRC PRESSURE 3066-3300 PSI - MUD WEIGHT: 8.85 PPG IN, 8.81 PPG OUT, ECD: 10.2 PPG AT WINDOW - ROP: 18-80 FT/HR, WOB 1.0 - 2.5 KLBS - AT 11578'STOPAND CIRCULATE FORA SAMPLE WHILE RECIPROCATING PIPE -GEOLOGIST SUSPECTS WE MAY BE IN SHUBLIK, SAMPLES SHOWED HIGH AMOUNTS OF PYRITE (20%) INDICATING TRANSITION ZONE PRIOR TO SHUBILIK - CONTINUE DRILLING PROD1 DRILL 4-118" LATERAL SECTION FROM 11609' TO 11900' - FREE SPIN: 3065 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.91 BPM OUT. CIRC PRESSURE 3066-3300 PSI - MUD WEIGHT: 8.85 PPG IN, 8.81 PPG OUT, ECD: 10.2 PPG AT WINDOW - ROP: 20-90 FT/HR, WOB 1.5 - 3.1 KLBS -PUMP PILLS FOR 11900' WIPER PRODI WIPERTRIPOPS - DRILLED 450' POOH CHASING PILLS TO THE WINDOW - PUMP PILLS FOR 7" - JOG IN HOLE BEFORE PULLING THROUGH THE WINDOW - OPEN EDC, POOH CHASING PILLS INTO THE 4-1/2 TT - LOG TIE IN, CORRECT *2.5' AND RIH TO THE WINDOW - CLOSE EDC, RIH LOOKING FOR RA, CAME IN AT 10736 Common Well Name: 14-38 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Page 8 of 10 Operation Summary Report Start Date: 9/25/2019 End Date. Site: 14 Spud Daterrime: 10/4/1988 12:00:OOAM AFE No H-S4DW0019GV-EX-D7-RN- (2,044,244.00 ) Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000836 Active datum: KB @74.00usB (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _.(hr). _ _ _ (usfQ_ 08:45 - 15:15 6.50 DRILL P 11,900.00 PROD1 DRILL 4-1/8"LATERAL SECTION FROM 11,900'-12241' - FREE SPIN: 3132 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.91 BPM OUT. CIRC PRESSURE 3140 — 3500 PSI - MUD WEIGHT: 8.89 PPG IN, 8.86 PPG OUT, ECD: 10.25 PPG AT WINDOW _- ROP: 20-90 FT/HR, WOB 1.3 - 3.3 KLBS 115:15 - 18:00 2.75 DRILL N 12,241.00 PROD1 STUCK PIPE OPS - DRILLED TO 12241' PU AND PULLING HEAVY 1 - WORK PIPE TO 90K SEVERAL TIMES '- MIX KCL PILLS AND PREP TO PUMP LVT - SHUT DOWN PUMP WHILE MAINTAINING 10.25 ECD - PU AND NO MOVEMENT 1 - ONLINE WITH KCL SPACERS AND LVT - 10 BBLS LVT OUT SHUT DOWN PUMP AND 'ALLOW TO SOAK - LVT IS PUSHING AWAY TO THE FORMATION 1 AND ECD IS DROPPING OFF '- CALL ODE AND DISCUSS HOW LOW WE CAN GO '- DROPPED TO 9.0 ECD PUMP UP TO 10.3, DROPPED TO 9.5, PU TO 85KAND PULLED FREE -CIRC OUT LVT AND SPACERS 18:00 - 2045 2.75 DRILL P 12,350.00 PROD1 DRILL 4-1/8" LATERAL SECTION FROM 12241'-12350 - FREE SPIN: 3132 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.91 BPM OUT. CIRC PRESSURE 3140-3500 PSI - MUD WEIGHT: 8.89 PPG IN, 8.86 PPG OUT, ECD: 10.25 PPG AT WINDOW - ROP: 20-90 FT/HR, WOB 1.3 - 3.3 KLBS NOTE: FREQUENT PICK UPS DUE TO TOOL FACE FLOPPING AND STACKOUTS. MOBILISE NEW MUD SYSTEM TO THE RIG. 20:45 - 00:00 3.25 DRILL P 12,350.00 PROD? WIPERTRIP - DRILLED 450' POOH CHASING PILLS TO THE WINDOW - PUMP PILLS FOR 7" -JOG IN HOLE BEFORE PULLING THROUGH THE WINDOW - OPEN EDC, POOH CHASING PILLS 10350' OBSERVED A 30% INCREASE IN DRILL CUTTINGS AT SWEEP AT SURFACE. - LOG TIE IN, CORRECT -4' AND RIH THROUGH WINDOW CLEAN - CLOSE EDC, RIH PERFORM JORPS SURVEY NOTE AT 10842' SAT DOWN MULTIPLE TIMES BUT EACH TIME FIVE FEET DEEPER, WORK THROUGH CLEAN AT 11860' 10/6/2019 00:00 - 01:00 1.00 DRILL P 12,350.00 PROD1 WIPERTRIP - RIH STARTING NEW MUD DOWN HOLE WITH 3% LUBES Printed 11/20/2019 4:13:32PM Common Well Name: 14-38 Event Type: RE-ENTER- Of Project: PBU North America - ALASKA - BP Operation Summary Report (RON) Start Date. 9/25/2019 End Date Site: 14 Spud Daterrime: 10/4/1988 12:00:OOAM AFE No Page 9 of 10 9GV-EX-Di-RN- (2,044 244 00 ) Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 01.00 - 11:30 10.50 DRILL P 12,440.00 PROD1 DRILL 4-1/8" LATERAL SECTION FROM rnnrou nrLW[u IL 4. 1 J.JLrM 12350'-12465' -NEW MUD COMING OUT BITAT START OF DRILLING. — FREE SPIN: 3076 PSI, 2.90 BPM - RATE: 2.91 BPM IN, 2.91 BPM OUT. CIRC PRESSURE 3140 — 3500 PSI - MUD WEIGHT: 8.89 PPG IN, 8.86 PPG OUT, ECD: 10.25 PPG AT WINDOW - ROP: 15-50 FT/HR, WOB 2.0 - 4.3 KLBS - DRILLING SHUBLIK SHALE FROM 12375 TO 12520 _ 11:30 - 1730 6.00 DRILL P 12875.00 PROD1 DRILL 4-1/8" LATERAL SECTION FROM 12465' TO 12875'TD(UNCORRECTED CALLED BY GEO) - FREE SPIN: 2996 PSI, 2.80 BPM - RATE: 2.81 BPM IN, 2.81 BPM OUT. CIRC PRESSURE 3140-3500 PSI - MUD WEIGHT: 8.78 PPG IN, 8.78 PPG OUT, ECD: 10.09 PPG AT WINDOW - ROP: 40-130 FT/HR, WOB 2.0-4.1 KLBS 17:30 - 00:00 6.50 DRILL P 12,875.00 PROD1 'WIPER TRIP - TD CALLED BY GEO, POOH CHASING PILLS TO THE WINDOW -PUMP PILLS FOR 7" - JOG IN HOLE BEFORE PULLING THROUGH THE WINDOW - OPEN EDC, POOH CHASING PILLSAT 10515' START PACKING OFF RUN BACK IN HOLEAND START ANOTHER LO/HI VIS SWEEP.RECIPROCATE THROUGH 7" AND CHASE SWEEP OUT OF HOLE TO 4500' OBSERVED A 30% INCREASE IN DRILL CUTTINGS AT SWEEP AT SURFACE WITH SHALE PIECES 0.25 TO 0.75 INCH IN SIZE .CHASE TO SURFACE TO CLEAN WELL BORE, JOG AT 1000'. NOTE: SHALES FOUND TO BE A MIX OF IVISHAK (12300'-12350') AND SHUBLIK _ (12380'-12530') 10/7/2019 00.00 - 04.15 4.25 DRILL P 12,87200 PROD? WIPER TRIP CHASE SWEEPS TO SURFACE, PULLING TO SWAB TO CLEAN WELL BORE. - RBIH - LOG TIE IN, CORRECT -32' AND CLOSE EDC, - RIH THROUGH WINDOW CLEAN - RUN TO TD CLEAN, TAG AT 12872' rnnrou nrLW[u IL 4. 1 J.JLrM North America - ALASKA - BP Operation Summary Report Common Well Name: 1438 Event Type: RE-ENTER- ONSHORE (RON) Start Date. 9/25/2019 Eno Date. Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1988 12:00:OOAM Rig Contractor: NABORSALASKA DRILLING INC. Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase (hr) (usft) 04:15 13:00 8.75 DRILL P 12,872.00 PROD1 13:00 - 17:15 4.25 –� —DRILL P 1715 - 1830 1.25 Printed 11/20/2019 4.13:32PM DRILL P Page 10 of 10 AFE No H-S40W0019GV-EX-DI-RN- (2,044,244.00 ) Rig Release: BPUOI: USA00000836 Description of Operations - POOH CHASING PILLS TO THE WINDOW - PUMP PILLS FOR 7" -JOG IN HOLE BEFORE PULLING THROUGH THE WINDOW - PULL THROUGH WINDOW, OPEN THE EDC AND JETACROSS THE WS AT MAX RATE POOH TO SURFACE CHASING PILLS FROM TD AND THE T' - - PUMP PILLS FOR 5000' START OF THE TANGENT I- PILLS BROUGHT LOT OF SMALL PIECES i OF SHALE THEN CLEANED UP JOG IN HOLE AT 150' FOR 300' AT MAX RATE, I WELL BORE IS CLEAN -TAG UP, ZERO DEPTHS AND RIH STILL PUMPING AT MAX RATE '- HOLDAKwTDRILL, DRILLER SIMULATED AND INCREASE IN OUT FLOW, STOPPED POOH, FLOW CHECKED THE WELL, OUT RATE WAS HIGHER THAN THE IN RATEAND THE WELL WAS SHUT IN FOLLOWING OUR STANDING ORDERS FOR MPD IN 27 SECONDS. ALL HANDS CALLED IN FROM THEIR STATIONS IN 1:12 TO COMPLETE THE DRILL - OUT MM STARTING TO PACK OFF, STOP RIH TO BLOW DOWN THEN RIH - LOG TIE IN, CORRECT -33', CLOSE THE EDC AND RIH __-TAG To AT 12875' 12,872.00 PROD? POOH OPS - DYNAMIC FLOW CHECK WELL WHILE PUMPING LINER PILL FOLLOWED BY 8.8 KWF -AT THE WINDOW, OPEN THE EDC AND DISPLACE WELL TO 9.8 KWF WHILE POOH - STOP AT 10324.66 (10245.23 EOP) AND PAINT TD FLAG (WHITE) - STOPAT 8084.66 (8005.23 EOP) AND PAINTA WINDOW FLAG (YELLOW) - 1000' SLOWLY BLEED OFF WHP 12,872.00 PROD? LAY DOWN LATERAL BHA - FLOW CHECK WELL GOOD NO FLOW, PU INJECTOR AND INSPECT COIL -POWERDOWN - INJECTOR OFF: 03:56 - INSPECT LAST 50' COILABOVE CTC - INJECTOR TROLLIED BACK PULL BHA OUT OF HOLE -BREAKBHADOWN. RINSEANDBLOW DOWN - LAY DOWN. SWAP TO CON REPORT 13B Common Well Name. 14-38 Event Type: COM- ONSHORE (CON) North America -ALASKA - BP Operation Summary Report Start Date: 10/7/2019 End Date Page 1 of 5 AFE No H-S4D W0019GV-EX-DI-RN- (1,592,544,00) Project: PBU - - Site: 14 Rig Narne/No.: CDR -2 Spud Date/rime: 10/4/1988 12:00:OOAM Rig Release: BPUOI: USA00000836 Active datum: KB @74.00usrt (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operafions (hr) (us8) 10/7/2019 1 18:30 - 20:30 2.00 CASING P 12,872.00 RUNCMP PREP TO RUN LINER 20.30 - 22:00 1.50 2200 CASING P Printed 11/202019 4:16:05PM 23:00 - 00.00 1.00 CASING P 10/8/2019 00:00 - 0730 7.50 CASING P Printed 11/202019 4:16:05PM - REMOVE COIL CONNECTOR AND UQC - INSTALL BOOT - MID CT TO 1 JT OF BTS -6 IN WELL, WU (INJECTOR. - PUMP ALL SLACK OUT AT 4 BPM AND MEASURE AND CUT 202.7'. '- INSTALL BOOT ON CT. - REMOVE JOINT OF BTS -6 FROM WELL NOTE: WHILE PUMPING SLACK ADD SHIM TO OFF DRILLER SIDE OF INJECTOR. 12.872.00 RUNCMP DRIFT COIL - INSTALL SWIVEL AND BALL CATCHER NOZZLE ON CT. - PJSM AND REVIEW PROCEDURE FOR DROPPING BALL. - DROP 7/8" BALL AND LAUNCH WITH 3000 PSI, BALL IS HEARD ROLLING. - CHASE WITH 8.8 # MUD TO DISPLACE REEL. - RECOVER 7/8" BALL. _ 12,872.00 RUNCMP PREP TORUN LINER PREPTONGS. INSPECT TOP DRIVE AND . COMPLETE CHECKLIST. ASSEMBLE XO FOR ELL CONTROL. - INSPECT RUNNING AND HANDLING EQUIPMENT. - WSL / RIG MANAGER / BOT FIELD SPECIALIST VERIFY JOINT COUNT AND RUNNING ORDER - PJSM AND REVIEW PROCEDURE FOR PICKING UP LINER. 12 872.00 RUNCMP MAKE UP LINER AS PER APPROVED LINER SUMMARY - MAKE UP SHOE TRACT - TEST FLOATS -GOOD - MAKE UP LINER FILLING EVERY 15 JOINTS 9.8 PPG KWF 12,872.00 RUNCMP MAKE UP LINER AS PER APPROVED LINER SUMMARY - MAKE UP LINER FILLING EVERY 15 JOINTS 9.8 PPG KWF - WSLAND BAKER FIELD SPECIALIST VERIFY JOINTS LEFT IN PIPE SHED PRIOR TO PICKING UP BCTLRT-CORRECT. NOTE: HOLD KICK WHILE TRIPPING DRILL WITH RICK ROY'S CREW. WELL SECURED IN 4 MINUTES 1 SECOND. CONDUCT AAR WITH CREW - WSL CHANGE OUT- ALL LINER RAN, VERIFY JOINT COUNT IN PIPE SHED - MU LINER RUNNING BHA, DRIFT COLLARS WITH 1.375 DRIFT -MU INJECTOR North America - ALASKA - BP Operation Summary Report Common Well Name: 14-38 Event Type: COM- ONSHORE (CON) Start Date: 10/7/2019 Eno Date. Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1988 12:00 OOAM Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB Q74.00usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth (hr) (usft) 0730 - 13:00 5.50 CASING P 12,872.00 13.00 - 17:30 Printed 11/20/2019 4:16:05PM 4.50 CASING P 12,872.00 Page 2 of 5 AFE No H-S4DW0019GV-EX-DI-RN-(1,592,544.00 ) Rig Release: Phase Description of Operations RUNCMP RIH OPS - STOP AT WINDOW FLAG DEPTH = 10672.84', EOP DEPTH = 8002' - CORRECT DEPTH -40.84' TO 10632' - RIH TO 10720' AND DISPLACE WELL TO 8.7 PPG MUD, LOSS RATE AT 0.7 BPM = 0.2 BPM, INCREASE RATE UNTIL LOSSES INCREASE WELL DISPLACED TO 8.7 PPG MUD, REDUCE RATE TO 0.1 BPM, HOLD 500 PSI WHPAND RIH WITH LINER -UP WT=51K, RIH Wr=26K - PUSHING ALL DISPLACEMENT AWAY AT 500 PSI WHP, DROP WHIP TO 400 PSI - SET DOWN AT 12577 PU WT 61 K, RIH, SET DOWN AT 12605 PU Wr = 61K. RIH, SET DOWN AT 12363, PU Wr = 60K - MADE DOWN TO 12664', STOP AND CIRCULATE AT 1 BPM 8100 PSI WHIP FORA FEW BBLS THEN TRY AGAIN - MADE IT DOWN TO 12636 AND WE ARE HAVING TO WORK IT DOWN WITH PU'S AND CIRCULATING - TAG 3 TIMES SOLID WITH CLEAN RIH WT'S AT 12867' S' FROM TD. CALL ODE AND CALL THIS GOOD - CALL OUT CMT CREW AND ESTABLISH CIRCULATION RUNCMP CIRCULATING OPS - LOW RETURN RATE ON BOTTOM, RECIPROCATE PIPE TO CLEAN UP THE OH - PU 5' PAST UP WTAND GET 1-1 RETURNS, INCREASE RATE TO 2.5 BPM, RIH AT 2.0 BPM TAG TD AND RETURNS DROP TO 1.1 BPM. CONTINUE RECIPROCATING TO TRYAND CLEAN UP - DECISION MADE TO SWAP TO KCL - KCLALL THE WAY AROUND, RIH AND SEE IF WE STILL HAVE GOOD RETURNS -GOOD RETURNS, GET UPAND DOWN Wr'S AND PREP TO DROPA BALLAND RELEASE FROM THE LINER - UP WT 71K THEN LEVELED OFF AT 62K, RIH WT=22K - LOAD 314" BALL - BALL ON SEAT AT 50.0 BBLS AND SHEARED AT 4100PSI. -SHUT DOWN PUMP AND PU TO VERIFY WE ARE RELEASED -PU Wr= 52KAND TRAVELED 4'CLEAN, SET BACK DOWN AND AND PREP TO PUMP CMT -ONLINE WITH PUMP, 1.49 BPM =765 PSI Common Well Name: 14-38 Event Type: COM- ONSHORE (CON) Rig Name/No.: CDR -2 Active datum: KB Q74.00u Date From - To 17:30 - 20:00 2000 - 2230 North America - ALASKA - BP Operation Summary Report 2.50 CEMT Printed 11/20/2019 4:16:05PM 12.872.00 Page 3 of 5 AFE No H-S4DW0019GV-EX-Di-RN- (1,592,544.00 ) BPUOI; USA00000836 Phase Description of Operations RUNCMP CIRCULATE BACK TO PITS 1.48 / 1.20 BPM AT 1166 PSI. - CEMENTERS GETTING RIGGED UP AND PRIMED UP. - CLEAR CEMENT FROM SR 6 8 7 AND BV2 - SEND CEMENTERS 3 BBLS OF 8.8# BRINE FOR PT. -PERFORM PRESSURE XCHECK VERIFICATION WITH WSLAND SLB PUMP OPERATOR GALT. WITNESS FUNCTION OF ELECTRONIC PRESSURE TRIP. -PRESSURE TEST SLB LINES TO 4700 PSI, GOOD. RUNCMP MIX AND PUMP 32.3 BBLS OF CEMENT: -CIRCULATE BACK TO PITS 1.5011.25 BPM AT 1340 PSI. - CEMENT WETAT 20:27 HRS. - PRE LOAD RIG SURFACE LINES WITH GEOVIS - SWAP TO CEMENT UNIT - ZERO IN MM ONCE DENSITY= 13.5 PPG - LOAD 32.3 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - RATE: 2.0 BPM IN, 1.67 BPM OUT - RATEAT 58 BBLS TOTAL PUMPED 1.5 BPM IN 1.2 BPM OUT. - ZERO OUT MM WITH CEMENT AT SHOE AT 75.7 BBLS AWAY - TAKE RETURNS TO PILL PIT FOR MANUAL STRAP - SHUT DOWN PUMPS AT 89.9 BBLS AWAY (13.2 BBLS CEMENT BEHIND PIPE) LAUNCH PEE WEE DART AND LINER WIPER PLUG AS FOLLOWS: - PICK UP TO BREAKOVER+16 FT (12841' MD) PER BTT REP, EXPOSE DOGS, -SET DOWN 10KAT 12852' MD AND LAUNCH PEE WEE DART. -PICKUP TO PRESSURE DROP. SIDE EXHAUST 3 BBLS CEMENT AND 3 BBLS EXHAUST PILL OPEN PUMP BLEED. SET BACK DOWN - PRESSURE UP ON WIPER PLUG AND ZERO IN MM AT 2000 PSI. -LINER WIPER PLUG SHEARED AT 3800 PSI '— DISPLACE LINER WIPER PLUG - DISPLACED AT 1.5 BPM: 2137 PSI LOST RETURNS AND REDUCED RATE TO 1 BPM AT 26.3 BBLS BBLS ON OUT MM, PUMPED (-6 BBLS SIDE EXHAUST) FOR 20.3 BBLS BEHIND PIPE - PLUG BUMPED AT 16.0 BBLS, 3300/4200 PSI (16 BBLS CALCULATED) - OPEN PUMP BLEEDER AND CHECK FLOATS. GOODTEST. CEMENT IN PLACE AT 2217 HRS Start Date: 1 01712 01 9 End Date. Site: 14 Spud Datw Time: 10/4/1988 12:00:00AM TILLING INC. Mean Sea Level) Hm Task Code NPT Total Depth (hr) (usft) 2.50 CEMT P 12,87200 2.50 CEMT Printed 11/20/2019 4:16:05PM 12.872.00 Page 3 of 5 AFE No H-S4DW0019GV-EX-Di-RN- (1,592,544.00 ) BPUOI; USA00000836 Phase Description of Operations RUNCMP CIRCULATE BACK TO PITS 1.48 / 1.20 BPM AT 1166 PSI. - CEMENTERS GETTING RIGGED UP AND PRIMED UP. - CLEAR CEMENT FROM SR 6 8 7 AND BV2 - SEND CEMENTERS 3 BBLS OF 8.8# BRINE FOR PT. -PERFORM PRESSURE XCHECK VERIFICATION WITH WSLAND SLB PUMP OPERATOR GALT. WITNESS FUNCTION OF ELECTRONIC PRESSURE TRIP. -PRESSURE TEST SLB LINES TO 4700 PSI, GOOD. RUNCMP MIX AND PUMP 32.3 BBLS OF CEMENT: -CIRCULATE BACK TO PITS 1.5011.25 BPM AT 1340 PSI. - CEMENT WETAT 20:27 HRS. - PRE LOAD RIG SURFACE LINES WITH GEOVIS - SWAP TO CEMENT UNIT - ZERO IN MM ONCE DENSITY= 13.5 PPG - LOAD 32.3 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - RATE: 2.0 BPM IN, 1.67 BPM OUT - RATEAT 58 BBLS TOTAL PUMPED 1.5 BPM IN 1.2 BPM OUT. - ZERO OUT MM WITH CEMENT AT SHOE AT 75.7 BBLS AWAY - TAKE RETURNS TO PILL PIT FOR MANUAL STRAP - SHUT DOWN PUMPS AT 89.9 BBLS AWAY (13.2 BBLS CEMENT BEHIND PIPE) LAUNCH PEE WEE DART AND LINER WIPER PLUG AS FOLLOWS: - PICK UP TO BREAKOVER+16 FT (12841' MD) PER BTT REP, EXPOSE DOGS, -SET DOWN 10KAT 12852' MD AND LAUNCH PEE WEE DART. -PICKUP TO PRESSURE DROP. SIDE EXHAUST 3 BBLS CEMENT AND 3 BBLS EXHAUST PILL OPEN PUMP BLEED. SET BACK DOWN - PRESSURE UP ON WIPER PLUG AND ZERO IN MM AT 2000 PSI. -LINER WIPER PLUG SHEARED AT 3800 PSI '— DISPLACE LINER WIPER PLUG - DISPLACED AT 1.5 BPM: 2137 PSI LOST RETURNS AND REDUCED RATE TO 1 BPM AT 26.3 BBLS BBLS ON OUT MM, PUMPED (-6 BBLS SIDE EXHAUST) FOR 20.3 BBLS BEHIND PIPE - PLUG BUMPED AT 16.0 BBLS, 3300/4200 PSI (16 BBLS CALCULATED) - OPEN PUMP BLEEDER AND CHECK FLOATS. GOODTEST. CEMENT IN PLACE AT 2217 HRS North America - ALASKA - BP Operation Summary Report Page 4 of 5 Common Well Name: 14-38 AFE No Event Type: COM- ONSHORE(CON) Start Date: 10/7/2019 Eno Data H-S4DW0019GV-EX-DI-RN-(1,592,544.00) Project: PBU Site: 14 Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1988 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000836 Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 CEMT P 12,872.00 RUNCMP -CLOSE PUMP BLEEDER, PRESSURE UPTO 1100 PSI ON COIL, PICK UPAND CONFIRM PRESSURE DROP - CIRCULATED CEMENT OUT OF HOLE. GOOD INDICATION OF EXHAUST CEMENT. - TEN MINUTE FLOW CHECK NO FLOW _ 23:00 - 00:00 1.00 CEMT P 12,872.00 RUNCMP POOH - POOH PUMPING AT 3.6 BPM -STOP AND FLOW CHECK AFTER THE FIRST 1000' FEET (TRIP SHEET SHOWING A 2BBL GAIN OVER ANTICIAPTED DISPLACEMENT.) TRACKED TO FLUID MOVEMENT IN PITS. _ -FLOW CHECK -STATIC 10/9/2019 00:00 - 00:45 0.75 CEMT P 12,872.00 RUNCMP CIRCULATE -CIRCULATE OUT GEO VIS AND COMPLETLV SWAP WELL OVER TO 8.4 PPG KCL TO ENSURE AN ACCURATE TRIP SHEET. PUMP AT 4 BPM 1_N AND OUT. 0045 - 0215 1.50 CEMT P 12,872.00 RUNCMP POOH - 4.06 BPM IN RATE /3.7 BPM OUT RATE - 8.43 PPG IN / 8.42 PPG OUT NOTE: RIG UP AND TEST LRS TO 4000 PSI GOOD 02:15 - 02:45 0.50 CEMT P 12,872.00 RUNCMP FREEZE PROTECT - PUMP 50 BBLS OF DIESEL INTO COILAT 3.5 BPM WITH LRS - WITH RIG PUMP UNTIL 5 BBLS OF DIESEL OUT THE END OF PIPE. 02:45 - 03:30 0.75 CEMT P _ 12,872.00 RUNCMP POOH POOH PUMPING AT 1.43 BPM IN 1.08 BPM OUT AT 80 FPM _ 03:30 - 07:15 3.75 CEMT - P 12,872.00 RUNCMP FLOW CHECK FLOW CHECK AT 300'- FLOWAT LUBRICATOR PUMP IN SUB T SHOWING A DECREASING TREND BUT NOT GOING TO ZERO DISCUSS WITH SUPERINTENDENT AND WELL OPS MANAGER, AGREE TO MONITOR FOR ANOTHER HALF HOUR AND DISCUSS IF FLOW DOES NOT STOP OR IF FLOW INCREASES. 0715 - 0815 1.00 CEMT P 12,872.00 RUNCMP FINGERPRINT DECREASING TREND, DISCUSS WITH WSUPT 8, RIG MANAGER AND AGREE TO CONTINUE WITH OPERATIONS - HOLD A PJSM WITH THE CREW LD BHA - BHA OOH, FLUID LEVEL IS STATIC JUST BELOW THE HANGER Printed 11/20/2019 4:16:05PM North America - ALASKA - BP Operation Summary Report Common Well Name. 14-38 Event Type. COM- ONSHORE (CON) Start Date: 119 Project: PBU Site: 14 Page 5 of 5 AFE No End Cate. H-S4DW0019GV-EX-Di-RN-(1,592,544.00) Rig Name/No.: CDR -2 Spud Date/Time: 10/4/1986 12'.00:00AM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000836 _ Active datum: KB @74.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations 08:15 - 00:00 15.75 RIGD P 12,872.00 POST RIG REEL OPS - SERVICE TREE AND TANGO VALVES - MU INJECTOR TO THE STACK - CLOSE MV #1, FLUID PACK TREE WITH METHANOL TO THE OUT MM - CLOSE SWAB AND LTT MV#1 - GOOD TEST, CLOSE MV #2 AND LTT - GOOD TEST, WELL IS SECURED - DISPLACE DIESEL OUT OF COIL TO FRESH WATER & JET STACK - PUMP CORROSION INHIBITED WATER INTO THE REEL FOLLOWED BY 10 BBLS OF NEAT METH - BLOW DOWN REEL WITH N2 AND BLEED OFF - UNSTAB PIPE AND SECURE AT THE REEL - PREP REEL TO OFF LOAD - OFF LOAD REEL - CONTINUE WITH CLEANING REEL BAY FOR UPCOMING UPGRADE - FLUSH RIG PIPING WITH FRESH WATER AND BLOWDOWN WITH BIG BOY COMPRESSOR - SAFEOUT BOPE STACK REMOVE RAMS 10/10/2019 0000 - 07'.00 7.00 RIGD P 12.872.00 POST CONTINUE OPENING RAMS. - PULL RAM BLOCKS / CLEAN RAM CAVITIES. - RIG DOWN CHECKLISTS - ND BOPE, NU TREE CAPAND TEST - GOOD TEST ON TREE CAP - CHECKLIST COMPLETED "'RIG RELEASED AT 07:00— Printed 11/20/2019 4:16:05PM T/1/0=0/0/0 Post CDR2. Removed CDR Test Spool #5. Installed tree cap, R/U lubricator, Set 4" FMC IS -A BPV #549 through CDR tree. Removed Kill line #2 and CDR tree #8. Installed new CIW FLS upper tree with SH -3000 (tag 104). Torqued to API specs. Pulled BPV #549. Installed FMC IS -A TTP #530. PT'd against TTP 300/low..5000/high.. pass. see "Field Charted Tests". Pulled 4" FMC IS -A TTP #530. R/D lubricator, installed tree cap, pt'd 500 psi. Job complete, see log for details. FWP's 0/0/0.SSV,SV,WV= C. MV=O, I/A, O/A = OTG. Note: AOGCC TEST REQUIRED WITHIN 5 DAYS OF POP DUE TO COMPONENT 10/10/2019 CHANGEOUT T/1/0= 40/vac/vac Temp= S/I (LRS Unit 70 - Liner Lap Pressure Test) Liner Lap Pressure Test Failed. TBG lost pressure to quickly to come off pump. Pumped 43 bbls 80*F crude down TBG to established a LLR of 1.4 bpm @ 2480 psi. Called in results to WSL. See log for details. Valve Positions: WV, SV, SSV, All hardline valves= closed; MV & Casing valves= open. 10/14/2019 FWHP's 1000/vac/vac (LRS Unit 70 - Liner Lap Pressure Test) ***Job Not Complete Due To Worley Crew Doing 10/14/2019 lWork In Area***** CTU#8 - 1.75" CT. Job Scope: Depth Log / Adperf ( Post CTD ) MIRU CTU. Perform Weekly BOP Test. MU & RIH w/ HES Logging Carrier & 2.35" Nozzle. Circulate safelube while rih. Drift to TD tag at 12846' and log up to 9900' painting a white tie- in flag at 12780'. Jet Liner Top from 10400'-10475' and POOH. 10/24/2019 ...Continued on WSR 10-25-19... CTU#8 - 1.75" CT. ***Cont. from WSR 10-24-19*** Job Scope: Depth Log / Adperf ( Post CTD ) Lay down logging tools and determine +10' correction. Corrected PBTD of 12856'. Make up Perf gun run #1 with 31.3 x 2.0" Powerjet Omega perf guns, 6 spf. RIH. Tie-in to PBTD tag and perforate 12520-12551', POOH. All shots fired, ball recovered. MU & RIH w/ Sib Perf Gun #2. Tag PBTD & Correct Depth. Puh & Perforate Interval 12343'- 12374'.?, Pooh. All shots fired, ball recovered. Trim 100' of coil, change pack offs. Make up Perf gun run #3 with 31.3 x 2.0" Powerjet Omega perf guns, 6 spf. RIH. Tie in to PBTD and pick up to shot depth. 10/25/2019 ...Continued on WSR 10-26-19.... CTU#8 - 1.75" CT. ***Cont. from WSR 10-25-19*** Job Scope: Depth Log / Adperf ( Post CTD ) Perforate 12314-12345' with Pert gun run #3 with 31.3 x 2.0" Powerjet Omega perf guns, 6 spf, POOH. Shots fired, ball recovered. Make up Perf gun run #4 with 31.3 x 2.0" Powerjet 1719'- Omega perf guns, 6 spf, RIH. Tag PBTD & correct depth. Puh & Perforate Interval 11719'- 11750'. Pooh. All shots fired, ball recovered. MU & RIH w/ Sib Perf Gun #5. Tag PBTD & 11750'. 1L_ correct depth. Puh & Perforate Interval 11690'- 11721'. Pooh. All shots fired, ball recovered. Trim 1 00'of coil and PT stack. Make up Perf gun run #6 with 31.3 x 2.0" Powerjet Omega perf guns, 6 spf, RIH. Tag PBTD & correct depth. PUH to shot depth. 10/26/2019 ...Continued on WSR 10-27-19... CTU#8 - 1.75" CT. ***Cont. from WSR 10-26-19*** Job Scope: Depth Log / Adperf ( Post CTD ) Perforate 11660-11691' with Perf gun run #6 with 31.3 x 2.0" Powerjet Omega pert guns, 6 spf, POOH. All shots fired, ball recovered. Make up Perf gun run #7 with 31.3 x 2.0" Powerjet Omega perf guns, 6 spf, RIH. Tag PBTD & correct depth. Puh & Perforate Interval 11436'- 11467'. Pooh. Freeze Protect Tbg w/ 24 bbls 60/40 Methanol & 14 bbls of diesel. All shots fired, ball recovered. Rig Down CTU. 10/27/2019 ***Job Complete*** Daily Report of Well Operations PBU 14-38A `**WELL S/I ON ARRIVAL**` (ctd) RIGUP HES UNIT 046 RIH w/ LTP DRIFT TAG DEPLOYMENT SLV @ 10428' MD 11/3/2019 ***CONT. TO 11/4/19 WSR*** ***CONT. FROM 11/3/19 WSR*** (ctd) SET 4-1/2" LTP & NS PTSA @ 10,411' SLM LRS PRESSURE TEST LTP PASSED (see Irs log) PULLED 2-7/8" RSG X LOCK @ 10,417' SLM LTP PULLED UP TO 10336' SLM JARRED ON LTP FROM 10,336' SLM TO 10,323' SLM RAN 3.7" LIB (see log) 11/4/2019 ***CONT. TO 11/5/19 WSR*** T/I/O=-15/-7/-8 Temp=Sl Assist slickline load and test (CTD) Pumped 16.4 bbls crude down TBG. (SEE LOG FOR DETAILS) Pumped 4.15 bbls crude downTbg to test LTP. Start test at 2508 psi on Tbg. Tbglost 77 psi in 1 st 15 mins and 26 psi in 2nd 15 mins for a total loss of 11/4/2019 103 psi . Bled Tbg to 150 psi. Slickline in control of well per LRS departure. FWHP's=150/-9/- T/1/0=85/0/0 Temp=Sl (LRS Unit 70: Assist SL- Flush TBG) Loaded TBG with 10.3 bbls of Crude to assist SL down hole 11/5/2019 ***WSR Continued on 11/06/2019*** ***CONT. FROM 11/4/19 WSR*** (ctd) PULLED 4-1/2" LTP & NS PTSA @ 10,411' SLM (missing 1 slip and @ elements) MULTIPLE RUNS w/ MAGNETS & BAILERS TO TOP OF DEPLOYMENT SLV @ 10428- 11/5/2019 MD, ***WSR Continued from 11/05/2019*** T/1/0=92/vactvac Temp=Sl (Assist S-line: Pressure Test Liner Top Packer) Pumped 6.2 bbls of 60* crude down TBG to reach 2500 psi (max applied =2500 psi, target =2250 psi). 1st 15 min TP lost 61 psi. 2nd 15 min lost 28 psi for a total of 89 psi in 30 min. Bleed TP down bleed back aprox 1.8 bbls S-line on well on dep Wing shut swab open ssv open master open casing valves open to 11/6/2019 gauges ***CONT. FROM 11/5/19 WSR*** (ctd) RUN LTP DRIFT TO DEPLOYMENT SLV @ 10,428' MD SET 4-1/2" LTP & NS PTSA c@ 10 404' SLM (top of LTP at 10,416' and LTP PASSED 2500 PSI PRESSURE TEST (see Irs log) PULLED 2.31" X LOCK & RSG @ 10,414' SLM SET 4-1/2" WCS @ 10,392' SLM PULLED RK-DGLV'S @ 5122' MD & 3176' MD SET STA # 1 RK-LGLV @ 3176' MD SET STA # 3 RK-SO @ 5122' MD 11/6/2019 ***CONT. TO 11/7/19 WSR*** ***CONT. FROM 11/6/19 WSR*** (ctd) PULL CATCHER @ 10396' SLM 11/7/2019 ***WELL S/I ON DEPARTURE, DSO NOTIFIED*** by North America - ALASKA - BP PBU 14 14-38 14-38A 500292186201 Design: 14-38A Final Survey Report 08 October, 2019 Company: North Amence- ALASKA -BP Project: PBU Site: 14 Well: 14-38 Wellbore: 14-38A Design: 14-38A BP Final Survey Report Local Coordinate Reference: Well 14-38 ND Reference: KB a 74.00usft (61 :38 10/4/1988 00:00) MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'158641 Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734'1586, Using geodetic scale factor Site 14, TR -10-14 Site Position: 80.8E From: Map Position Uncertainty: 0.00 usft Well 14-38,14-38 Well Position -NI-S 0.00 usft 0.00 «E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 14-38A Northing: Easting: Slot Radius: 5,939,577.430 usft 674,150.480 usft 0.000 in Northing: 5,937,910.530 usft Easing: 674,878.910 usft Wnllhnad Pluwti— 43 n1 uQH Magnetics Model Name Sample Date Declination Dip Angle Design Audit Notes: Version: Vertical Section: BGGM2018 10/1/2019 16.67 80.8E 14-36A +N/ -S -E/-W Direction Latitude: Longitude: Grid Convergence: Field Strength (nT) 57,403 Phase: ACTUAL Tie On Depth: 10,700.00 Depth From (ND) +N/ -S -E/-W Direction (usft) (usft) (usft) (°) 0.00 0.00 0.00 229.07 Latitude: Longitude: Ground Level: 70° 14'26.346 N 148° 35'36.726 W 1.32 ° 70" 14' 9.789 N 148° 35' 16.679 W 40.06 usft 10/6/2019 3:14:OOPM Page 2 COMPASS 5000.1 Build 81D 50 BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 36 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCPI Survey Program Date 10/8/2019 From To (usft) (usft) Survey, (Wellbore) Tool Name Description 100.00 10,700.00 GyroData Gyro (14-38) GYD-CT-CMS Gyrodata cont.casing Ms 10,726.00 12,872.00 Survey#1 (14-38A) MWD MWD -Standard Survey MD Inc A=1 TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (-ft) (usft) (°/100usft) 30.99 0.00 0.00 30.99 43.01 0.00 0.00 5,937,910.530 674,878.910 0.00 100.00 0.16 243.07 100.00 26.00 -0.04 -0.09 5,937,910.484 674,878.825 0.23 200.00 0.10 283.76 200.00 126.00 -0.09 -0.30 5,937,910.437 674,878.617 0.11 300.00 0.06 172.16 300.00 226.00 -0.12 -0.37 5,937,910.404 674,878.540 0.13 400.00 0.06 218.76 400.00 326.00 -0.21 -0.40 5,937,910.311 674,878.517 0.05 500.00 0.10 131.36 500.00 426.00 -0.31 -0.37 5,937,910.213 674,878.552 0.11 600.00 0.07 88.39 600.00 526,00 -0.36 -0.24 5,937,910.160 674,878.679 0.07 700.00 0.04 131.27 700.00 626.00 -0.39 -0,15 5,937,910.141 674,878.767 0.05 800.00 0.09 168.95 800.00 726.00 -0.49 -0.11 5,937,910.042 674,878.811 0.06 900.00 0.08 315.00 900.00 826.00 -0.51 -0.14 5,937,910.013 674,878.777 0.16 1,000.00 0.09 89.51 1,000.00 926.00 -0.46 -0.12 5,937,910.064 674,878.805 0.16 1,100.00 0.15 126.65 1,100.00 1,026.00 -0.54 0.07 5,937,909.991 674,878.990 0.10 1,200.00 0.15 132.94 1,200.00 1,126.00 -0.71 0.27 5,937,909.828 674,879.195 0.02 1,300.00 0.23 147.68 1,300.00 1,226.00 -0.97 0.47 5,937,909.574 674,879.404 0.09 1,400.00 0.25 160.97 1,400.00 1,326.00 -1.34 0.65 5,937,909.202 674,879.591 0.06 1,500.00 0.37 134.28 1,500.00 1,426.00 -1.77 0.95 5,937,908.778 674,879.903 0.18 1,600.00 0.36 136.02 1,599.99 1,525.99 -2.23 1.40 5,937,908.337 674,880.363 0.01 1,700.00 0.39 127.84 1,699.99 1,625.99 -2.66 1.89 5,937,907.914 674,880.860 0.06 1,800.00 0.43 109.60 1,799.99 1,725.99 -3.00 2.51 5,937,907.593 674,881.490 0.14 1,900.00 0.49 79.37 1,899.99 1,825.99 -3.04 3.28 5,937,907.564 674,882.264 0.25 2,000.00 0.51 82.85 1,999.98 1,925.98 -2.91 4.15 5,937,907.719 674,883.123 0.04 V. Sec (usft) 0.00 0.09 0.28 0 36 044 0.48 0.42 0.37 040 045 0.39 0.30 0.26 0.28 0.39 0.44 0.40 0.32 0.07 -0.49 -1.23 10/&2019 3:14:OOPM Page 3 COMPASS 5000.1 Build 810 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN TVD TVDSS NiS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usR) (usfq (usft) (usft) (usft) (uri t) (°7100usft) (usft) 2,100.00 0.48 93.83 2,099.98 2,025.98 -2.88 5.01 5,937,907.766 674,883.981 0.10 -1.89 2,200.00 0.31 115.97 2,199.98 2,125.98 -3.03 5.67 5,937,907.635 674,884.646 0.23 -2.30 2,300.00 0.33 105.74 2,299.97 2,225.97 -3.22 6.19 5,937,907.450 674,885.171 0.06 -2.56 2,400.00 0.40 97.84 2,399.97 2,325.97 -3.35 6.81 5,937,907.339 674,885.796 0.09 -2.95 2,500.00 0.45 106.46 2,499.97 2,425.97 -3.51 7.53 5,937,907.197 674,888.522 0.08 -3.39 2,600.00 0.40 109.05 2,599.97 2,525.97 -3.73 8.24 5,937,906.988 674,887.234 0.05 -378 2,700.00 0.44 101.07 2,699.96 2,625.96 -3.92 8.95 5,937,906.817 674,887.944 0.07 -4.19 2,800.00 0.37 89.36 2,799.96 2,725.96 -3.99 9.65 5,937,906.763 674,888.646 0.11 -4.67 2,900.00 0.23 86.89 2,899.96 2,825.96 -3.98 10.17 5,937,906.790 674,889.168 0.14 -5.08 3,000.00 0.06 90.55 2,999.96 2,925.96 -3.97 10.42 5,937,906.806 674,889.421 0.17 -5.28 3,100.00 0.05 90.55 3,099.96 3,025.96 -3.97 10.52 5,937,906.808 674,889.517 0.01 -5.35 3,200.00 0.17 121.82 3,199.96 3,125.96 -4.05 10.69 5,937,906.733 674,889.688 0.13 -5.42 3,300.00 0.13 119.41 3,299.96 3,225.96 -4.18 10.91 5,937,906.604 674,889.916 0.04 -5.51 3,400.00 0.13 82.07 3,399.96 3,325.96 4.22 11.12 5,937,906.569 674,890.128 0.08 -5.64 3,500.00 0.65 11946 3,499.96 3,425.96 -4.48 11.73 5,937,906.320 674,890.740 0.55 -5.93 3,600.00 0.88 142.76 3,599.95 3,525.95 -5.37 12.69 5,937,905.452 674,891.719 0.38 -6.07 3,700.00 4.76 199.16 3,699.82 3,625.82 -9.91 11.79 5,937,900.900 674,890.927 4.34 -242 3,800.00 8.48 204.85 3,799.13 3,725.13 -20.52 7.33 5,937,890.186 674,886.713 3.77 7.91 3,900.00 9.75 210.90 3,897.87 3,823.87 -34.48 -0.12 5,937,876.061 674,879.592 1.59 22.68 3,925.00 10.19 213.02 3,922.49 3,848.49 -38.15 -2.41 5,937,872.339 674,877.385 2.29 26.81 3,950.00 11.03 217.19 3,947.07 3,873.07 -41.91 -5.06 5,937,868.519 674,874.823 4.55 31.28 3,975.00 11.61 218.85 3,971.58 3,897.58 -45.77 -8.08 5,937,864.586 674,871.890 2.66 36.09 4,000.00 12.31 220.46 3,996.04 3,922.04 -49.76 -11.39 5,937,860.524 674,868.676 3.10 41.21 4,025.00 13.13 221.94 4,020.42 3,946.42 -53.90 -15.02 5,937,856.301 674,865.146 3.53 46.66 4,050.00 13.62 222.40 4,044.75 3,970.75 -58.18 -18.90 5,937,851.926 674,861.364 2.01 52.40 4,075.00 14.60 222.06 4,068.99 3,994.99 -62.70 -23.00 5,937,847.320 674,857.374 3.93 58.45 4,100.00 15.38 221.52 4,093.14 4,019.14 -67.52 -27.31 5,937,842.400 674,853.179 3.17 64.86 10/&2019 3:14:OOPM Page 4 COMPASS 5000.1 Build 81D RE BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: Pau ND Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference! True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND 7VDSS NIS EW Northing Easting DLeg V. Seo (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100uefU (usft) 4,125.00 15.88 220.95 4,117.22 4,043.22 -72.58 -31.75 5,937,837.233 674,848.859 2.09 71.51 4,150.00 16.07 220.81 4,141.25 4,067.25 -77.79 -36.25 5,937,831.928 674,844.478 0.78 78.35 4,175.00 16.23 221.13 4,165.26 4,091.26 -83.04 -40.81 5,937,828.574 674,840.041 0.73 85.23 4,200.00 16.69 222.60 4,189.24 4,115.24 -88.31 -45.54 5,937,821.192 674,835.437 2.48 92.26 4,225.00 17.54 226.10 4,213.13 4,139.13 -93.57 -50.68 5,937,615.819 674,830.416 5.34 99.59 4,250.00 17.92 226.69 4,236.95 4,162.95 -98.82 -56.19 5,937,810.443 674,825.027 1.68 107.19 4,275.00 18.95 227.77 4,260.66 4,186.66 -104.18 -62.00 5,937,804.943 674,819.349 4.34 115.09 4,300.00 19.65 228.22 4,284.26 4,210.26 -109.71 -68.14 5,937,799.274 674,813.339 2.86 123.36 4,325.00 20.57 228.77 4,307.73 4,233.73 -115.41 -74.58 5,937,793.431 674,807.035 3.76 131.95 4,350.00 21.64 229.64 4,331.06 4,257.06 -121.29 -81.39 5,937,787.395 674,800.358 4.46 140.95 4,375.00 22.33 229.99 4,354.24 4,280.24 -127.33 -88.54 5,937,781.193 674,793.350 2.81 150.31 4,400.00 22.61 229.94 4,377.34 4,303.34 -133.47 -95.86 5,937,774.879 674,786.180 1.12 159.86 4,425.00 22.72 229.47 4,40041 4,326.41 -139.70 A03.21 5,937,768480 674,778.979 0.85 169.50 4,450.00 22.55 227.33 4,42348 4,349.48 -146.09 -110.40 5,937,761.929 674,771.935 3.36 179.12 4,475.00 22.70 227.11 4,446.56 4,372.56 -152.62 -117.46 5,937,755.235 674,765.030 0.69 188.73 L 4,500.00 23.05 226.89 4,469.59 4,395.59 -159.25 -124.57 5,937,748.445 674,758.079 1.44 1984 4,525.00 23.76 226.60 4,492.54 4,418.54 -166.05 -131.80 5,937,741.474 674,751.007 2.88 208.36 4,550.00 24.97 226.85 4,515.31 4,441.31 -173.12 -139.31 5,937,734.233 674,743.664 4.86 218.67 4,575.00 26.21 226.73 4,537.86 4,463.86 -180.52 -147.18 5,937,726.660 674,735.968 4.96 22946 4,600.00 27.35 226.62 4,560.17 4,486.17 -188.25 -155.37 5,937,718.744 674,727.956 4.56 240.71 4,625.00 28.04 226.52 4,582.31 4,508.31 -196.23 -163.81 5,937,710.563 674,719.706 2.77 252.32 4,650.00 28.92 226.49 4,604.28 4,530.28 -204.44 -172.46 5,937,702.160 674,711.251 3.52 264.231 4,675.00 29.91 225.99 4,626.06 4,552.06 -212.93 -181.32 5,937,693.464 674,702.584 4.08 278491 4,700.00 31.06 225.26 4,647.61 4,573.61 -221.80 -190.39 5,937,684.367 674,693.729 4.83 289.15 4,725.00 32.22 224.24 4,668.89 4,594.89 -231.12 -199.62 5,937,674.861 674,684.717 5.11 302.231 4,750.00 33.13 223.51 4,689.93 4,615.93 -240.85 -208.97 5,937,664.918 674,675.592 3.97 315.67 4,775.00 33.84 223.34 4,710.78 4,636.78 -250.86 -218.45 5,937,654.684 674,666.347 2.86 329.391 10/&2019 3:14:OOPM Page 5 COMPASS 5000.1 Build 81D 0b BP p Final Survey Report Company: North America -ALASKA -BP Local Coordinate Reference: Well 1438 Project: PBU TVD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 4,800.00 34.31 223.39 4,731.49 4,657.49 -261.05 -228.07 5,937,644.281 674,658.968 1.88 343.33 4,825.00 35.14 223.60 4,752.04 4,678.04 -271.38 -237.87 5,937,633.727 674,647.409 3.35 357.51 4,850.00 35.63 223.84 4,772.42 4,698.42 -281.84 -247.88 5,937,623.036 674,637.649 2.04 371.92 4,875.00 36.08 224.25 4,792.68 4,718.68 -292.37 -258.06 5,937,612.278 674,627.716 2.04 386.51 4,900.00 36.92 225.52 4,812.78 4,738.78 -302.90 -268.55 5,937,601.503 674,617.470 4.52 401.34 4,925.00 37.71 226.38 4,832.66 4,758.66 -313.44 -279.45 5,937,590.718 674,606.825 3.79 416.47 4,950.00 38.93 227.85 4,852.28 4,778.28 -323.98 -290.81 5,937,579.912 674,595.714 6.09 431.96 4,975.00 39.79 228.46 4,871.61 4,797.61 -334.56 -302.62 5,937,569.066 674,584.152 3.77 447.81 5,000.00 40.32 228.77 4,890.74 4,816.74 -345.19 -314.69 5,937,558.153 674,572.332 2.27 463.90 5,025.00 40.78 228.87 4,909.74 4,835.74 -355.90 -326.92 5,937,547.172 674,560.352 1.86 460.15 5,050.00 41.20 228.63 4,928.61 4,854.61 -366.69 -339.27 5,937,536.099 674,548.259 1.68 496.55 5,075.00 41.59 228.88 4,947.36 4,873.36 -377.56 -351.72 5,937,524.937 674,536.066 1.57 513.08 5,100.00 41.95 228.93 4,966.01 4,892.01 -388.51 -364.27 5,937,513.703 674,523.774 1.45 529.73 5,125.00 42.02 228.81 4,984:59 4,910.59 -399.51 -376.86 5,937,502414 674,511.437 0.43 54646 5,150.00 42.32 228.93 5,003.12 4,929.12 -410.55 -389.51 5,937,491.085 674,499A55 1.24 563.24 5,175.00 42.33 229.01 5,021.60 4,947.60 -421.60 -402.20 5,937,479.744 674,486.817 0.22 580.07 5,200.00 42.53 229.01 5,040.05 4,966.05 432.66 414.94 5,937,468.389 674,474.146 0.80 596.94 5,225.00 42.74 229.00 5,058.45 4,984.45 443.77 427.72 5,937,456,988 674,461.628 0.84 613.87 5,250.00 43.02 228.99 5,076.77 5,002.77 454.93 440.55 5,937,445.533 674,449.053 1.12 630.89 5,275.00 43.02 229.04 5,095.04 5,021.04 466.12 453.43 5,937,434.051 674,436.441 0.14 647.94 5,300.00 42.80 229.04 5,113.36 5,039.36 -477.28 466.28 5,937,422.599 674,423.850 0.88 664.96 5,325.00 42.97 229.10 5,131.67 5,057.67 -488.42 479.14 5,937,411.159 674,411.260 0.70 681.98 5,350.00 42.93 229.18 5,149.97 5,075.97 499.57 492.02 5,937,399.720 674,398.639 0.27 699.01 5,375.00 43.25 229.18 5,168.23 5,094.23 -510.73 -504.94 5,937,388.260 674,385.978 1.28 716.09 5,400.00 43.20 229.29 5,186.45 5,112.45 -521.91 -517.91 5,937,376.783 674,373.274 0.36 733.21 5,425.00 43.49 229.30 5,204.63 5,130.63 -533.10 -530.92 5,937,365.294 674,360.529 1.16 750.37 5,450.00 43.82 229.34 5,222.71 5,148.71 -544.35 -544.01 5,937,353.745 674,347.707 1.32 767.63 IOIWO19 3.14:OOPM Page 6 COMPASS 5000.1 Build 81D RE BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: Pau TVD Reference: KB Q 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KS @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi TVD NDSS NIS E/W Northing Easting DLeg V.Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 5,475.00 43.70 229.37 5,240.77 5,166.77 -555.61 -557.13 5,937,342.182 674,334.853 049 784.92 5,500.00 43.84 229.36 5,258.82 5,184.82 -566.88 -570.25 5,937,330.619 674,321.994 0.56 802.21 5,525.00 43.79 229.24 5,276.86 5,202.86 -578.16 -583.37 5,937,319.031 674,309.138 0.39 819.52 5,550.00 43.81 229.21 5,294.91 5,220.91 -589.46 -596.46 5,937,307.430 674,296.301 0.12 836.82 5,575.00 43.78 229.16 5,312.95 5,238.95 -600.77 -609.57 5,937,295.822 674,283.473 0.18 854.13 5,600.00 43.69 229.17 5,331.02 5,257.02 -612.07 -622.65 5,937,284.221 674,270.663 0.36 87141 5,625.00 43.79 229.16 5,349.06 5,275.08 -623.38 -635.73 5,937,272.619 674,257.852 0.40 888.69 5,650D0 43.59 229.23 5,367.16 5,293.16 -634.66 -648.80 5,937,261.035 674,245.047 0.82 905.96 5,675.00 43.73 229.19 5,385.24 5,311.24 -645.94 -661.87 5,937,249.460 674,232.245 0.57 923.22 5,700.00 44.10 229.26 5,403.25 5,329.25 -657.26 -675.00 5,937,237.835 674,219.381 1.49 940.56 5,725.00 44.03 229.18 5,421.21 5,347.21 -668.62 -688.16 5,937,226.177 674,206.483 0.36 957.95 5,750.00 44.10 229.30 5,439.18 5,365.18 -679.97 -701.33 5,937,214.524 674,193.581 0.44 975.34 5,775.00 43.99 229.19 5,457.15 5,383.15 -691.32 -714.50 5,937,202.876 674,180.883 0.54 992.72 5,800.00 43.90 229.25 5475.15 5,401.15 -702.65 -727.63 5,937,191.244 674,167.813 0.40 11010.07 5,825.00 44.07 229.17 5,493.14 5,419.14 -713.99 -740.78 5,937,179.600 674,154.936 0.72 1,027.43 5,850.00 43.97 229.16 5,511.11 5,437.11 -725.35 -753.92 5,937,167.940 674,142.059 0.40 1,044.80 5,875.00 43.96 229.19 5,529.11 5,455.11 -736.70 -767.06 5,937,156.293 674,129.194 0.09 1,062.16 5,900.00 43.86 229.22 5,547.12 5,473.12 -748.02 -780.18 5,937,144.664 674,116.335 0.41 1,079.49 5,925.00 43.80 229.15 5,565.15 5,491.15 -759.34 -793.29 5,937,133.048 674,103.499 0.31 1,096.81 5,950.00 43.89 229.18 5,583.18 5,509.18 -770.66 -806.39 5,937,121.424 674,090.663 0.37 1,114.12 5,975.00 43.64 229.18 5,601.24 5,527.24 -781.97 -819.47 5,937,109.820 674,077.843 1.00 1,131.42 6,000.00 43.70 229.11 5,619.32 5,545.32 -793.26 -832.53 5,937,098.229 674,065.053 0.31 1,148.68 6,025.00 43.86 229.08 5,637.37 5,563.37 -804.59 -845.60 5,937,086.603 674,052.247 0.65 1,165.98 6,050.00 43.72 229.00 5,655.42 5,581.42 -815.93 -858.67 5,937,074.963 674,039.449 0.60 1,183.28 6,075.00 43.42 229.08 5,673.53 5,599.53 -827.22 -871.68 5,937,063.370 674,026.703 1.22 1,200.51 6,100.00 43.85 229.05 5,691.63 5,617.63 -838.53 -884.71 5,937,051.768 674,013.937 1.72 1,217.76 6,125.00 43.66 229.03 5,709.68 5,635.68 -849.86 -897.77 5,937,040.135 674,001.148 0.76 1,235.05 10/82019 3: 14:OOPM Page 7 COMPASS 5000.1 Build 81D RE BP Final Survey Report Company: North America - ALASKA- BP Local Coordinate Reference: Well 14-38 Project: PBU ND Reference: KB Q? 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD NDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) i 6,150.00 43.67 226.96 5,727.77 5,653.77 -861.18 -910.80 5,937,028.512 873,988.389 020 1,252.31 6,175.00 43.61 229.03 5,745.86 5,671.86 -872.50 -923.82 5,937,016.893 673,975.635 0.31 1,269.56 6,200.00 43.42 229.08 5,763.99 5,689.99 -883.79 -936.82 5,937,005.315 673,962.899 0.77 1,286.78 6,225.00 43.21 229.09 5,782.18 5,708.18 -895.02 -949.78 5,936,993.786 673,950.204 0.84 1,303.93 6,250.00 43.17 229.15 5,800.41 5,726.41 -906.22 -962.72 5,936,982.291 673,937.531 0.23 1,321.04 6,275.00 43.05 229.33 5,818.66 5,744.66 -917.37 -975.66 5,936,970.840 673,924.853 0.69 1,338.12 6,300.00 42.88 229.34 5,836.95 5,762.95 -928.47 -988.58 5,936,959.441 673,912.190 0.68 1,355.16 6,325.00 42.66 229.46 5,655.30 5,781.30 -939.52 -1,001.47 5,936,948.098 673,899.561 0.94 1,372.14 6,350.00 42.91 229.47 5,873.65 5,799.65 -950.56 -1,014.38 5,936,936.766 673,886.916 1.00 1,389.12 6,375.00 42.94 229.42 5,891.96 5,817.96 -961.63 -1,027.31 5,936,925.400 673,874.241 0.18 1,406.14 6,400.00 42.95 229.36 5,910.26 5,836.26 -972.72 -1,040.24 5,936,914.016 673,861.571 0.18 1,423.18 6,425.00 43.13 229.52 5,928.53 5,854,53 -983.81 -1,053.21 5,936,902.623 673,848.868 0.81 1,440.24 6,450.00 42.94 229.52 5,948.80 5,872.80 -994.89 -1,066.19 5,936,891.250 673,836.152 0.76 1,457.30 6,475.00 43.27 229.56 5,965.05 5,891.05 -1,005.97 -1,079.18 5,936,879.867 673,823.415 1.32 1,474.38 6,500.00 43.27 229.63 5,983.26 5,909.26 -1,017.08 -1,092.23 5,936,868.460 673,810.629 0.19 1,491.52 6,525.00 43.38 229.72 6,001.44 5,927.44 -1,028.18 -1,105.31 5,936,657.061 673,797.813 0.50 1,508.67 6,550.00 43.63 229.59 6,019.58 5,945.56 -1,039.32 -1,118.43 5,936,845.618 673,784.959 1.06 1,525.88 6,575.00 43.79 229.70 6,037.65 5,963.65 -1,050.51 -1,131.59 5,936,834.131 673,772.058 0.71 1,543.16 6,600.00 44.05 229.65 6,055.66 5,981.66 -1,061.73 -1,144.81 5,936,822.806 673,759.102 1.05 1,560.50 6,625.00 43.88 229.65 6,073.65 5,999.65 -1,072.97 -1,158.04 5,936,811.066 673,746.140 0.68 1,577.85 6,650.00 44.07 229.63 6,091.64 6,017.64 -1,084.21 -1,171.27 5,936,799.522 673,733.178 0.76 1,595.21 6,675.00 44.02 229.57 6,109.61 6,035.61 -1,095.47 -1,184.50 5,936,787.954 673,720.208 0.26 1,612.59 6,700.00 43.93 229.46 6,127.60 6,053.60 -1,106.74 -1,197.70 5,936,776.381 673,707.271 0.47 1,629.95 6,725.00 44.19 229.62 6,145.57 6,071.57 -1,118.02 -1,210.93 5,936,764.797 673,694,309 1.13 1,647.33 6,750.00 44.25 229.45 6,163.48 6,089.48 -1,129.34 -1,224.20 5,936,753.178 673,681.311 0.53 1,664.77 6,775.00 44.53 229.46 6,181.35 6,107.35 -1,140.71 -1,237.49 5,936,741.505 673,668.290 1.12 1,682.25 6,800.00 4449 229.52 6,199.18 6,125.18 -1,152.09 -1,250.81 5,936,729.815 673,655.234 0.23 1,699.781 10/8@019 3:14:OOPM Page 8 COMPASS 50001 Build 810 BP Final Survey Report Company: North Amedoa- ALASKA -BP Local Coordinate Reference: Well 14-38 Project: PBU TVD Reference: KB@74.00us%(61:3810/4/198800:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi NO NDS$ NIS EM Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100asft) (us 6,825.00 44.64 229.53 6,216.99 6,142.99 -1,163.48 -1,264.16 5,936,718.122 673,642.157 0.60 1,717.32 6,850.00 44.92 229.51 6,234.73 6,160.73 -1,174.91 -1,277.55 5,936,706.384 673,629.033 1.12 1,734.93 6,875.00 44.85 229.44 6,252.45 6,178.45 -1,186.38 -1,290.96 5,936,694.613 673,615.893 0.34 1,752.57 6,900.00 45.16 229.44 6,270.12 6,196.12 -1,197.87 -1,304.39 5,936,682.810 673,602.732 1.24 1,770.25 6,925.00 45.31 229.50 6,287.73 6,213.73 -1,209.41 -1,317.86 5,936,670.966 673,589.513 0.62 1,788.00 6,950.00 45.53 229.46 6,305.28 6,231.26 -1,220.98 -1,331.42 5,936,659.086 673,576.250 0.89 1,805.81 6,975.00 45.41 229.57 6,322.61 6,248.81 -1,232.55 -1,344.98 5,936,647.205 673,562.968 0.57 1,823.63 7,000.00 45.60 229.57 6,340.33 6,266.33 -1,244.11 -1,358.55 5,936,635.329 673,549.866 0.76 1,841.46 7,025.00 45.65 229.75 6,357.81 6,283.81 -1,255.68 -1,372.17 5,936,623.450 673,536.318 0.55 1,859.33 7,050.00 45.69 229.92 6,375.28 6,301.28 -1,267.21 -1,385.84 5,936,611.602 673,522.924 0.51 1,877.21 7,075.00 45.68 229.68 6,392.75 6,318.75 -1,278.76 -1,399.50 5,936,599.744 673,509.534 0.69 1,895.10 7,100.00 45.85 229.70 6,410.19 6,336.19 -1,290.35 -1,413.16 5,936,587.843 673,496.148 0.68 1,913.01 7,125.00 45.83 229.81 5,427.60 6,353.80 -1,301.93 -1,426.85 5,936,575.942 673,482.732 0.33 1,930.94 7,150.00 45.90 229.77 644501 6,371.01 -1,313.52 -1,440.55 5,936,564.045 673,469.303 0.30 1,948.86 7,175.00 46.02 229.92 6,462.39 6,388.39 -1,325.11 -1,454.28 5,936,552.141 673,455.841 0.65 1,966.85 7,200.00 45.94 229.94 8,479.76 6,405.76 -1,336.68 -1,468.04 5,936,540.254 673,442.356 0.33 1,984.83 7,225.00 46.11 229.92 6,497.12 6,423.12 -1,348.26 -1,481.81 5,936,528.357 673,428.862 0.68 2,002.82 7,250.00 46.12 230.04 6,514.45 6,440.45 -1,359.85 -1,495.61 5,936,516.454 673,415.336 0.35 2,020.83 7,275.00 46.00 230.22 6,531.80 6,457.80 -1,371.39 -1,509.43 5,936,504.598 673,401.792 0.71 2,038.83 7,300.00 46.21 230.15 6,549.13 6,475.13 -1,382.92 -1,523.26 5,936,492.745 673,388.226 0.86 2,056.84' 7,325.00 46.07 230.14 6,566.46 6,492.46 -1,394.47 -1,537.10 5,936,480.876 673,374.661 0.56 2,074.87 7,350.00 46.32 230.32 6,583.76 6,509.76 -1,406.02 -1,550.97 5,936,469.017 673,361.066 1.13 2,092.91 7,375.00 46.20 230.37 6,601.05 6,527.05 -1,417.54 -1,564.87 5,936,457.172 673,347.431 0.50 2,110.96 7,400.00 46.26 230.37 6,618.34 6,544.34 -1,429.06 -1,578.78 5,936,445.338 673,333.799 0.24 2,129.01 7,425.00 46.50 230.81 6,635.59 6,561.59 -1,440.57 -1,592.74 5,936,433.504 673,320.108 1.19 2,147.10 7,450.00 46.26 230.73 6,652.83 6,578.83 -1,452.04 -1,606.74 5,936,421.713 673,306.379 1.02 2,165.20 7475.00 46.48 230.69 6,670.08 6,596.08 -1,463.50 -1,620.75 5,936,409.933 673,292.645 0.89 2,183.28, 101/2019 3: 14:OOPM Page 9 COMPASS 5000.1 Build 81D DOM BP Final Survey Report Company: North America - ALASKA - BP Local Coortlinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc An TVD TVDSS NIS EIW Northing Fasting DLeg V. Sec (usft) (°) (^) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,500.00 46.37 230.78 6,687.32 6,613.32 -1,474.96 -1,634.77 5,936,398.149 673,278.893 0.51 2,201.39 7,525.00 46.44 230.89 6,704.56 6,630.56 -1,486.40 -1,648.81 5,936,386.392 673,265.125 0.42 2,219.48 7,550.00 46.45 230.94 6,721.78 6,647.78 -1,497.82 -1,662.87 5,936,374.647 673,251.331 0.15 2,237.59 7,575.00 48.13 230.99 6,739.06 6,665.06 -1,509.20 -1,676.91 5,936,362.944 673,237.563 1.29 2,255.65 7,600.00 46.37 231.20 6,756.34 6,682.34 -1,520.54 -1,690.96 5,936,351.280 673,223.777 1.14 2,273.70 7,625.00 46.36 231.18 6,773.60 6,699.60 -1,531.88 -1,705.06 5,936,339.617 673,209.945 0.07 2,291.78 7,650.00 46.23 231.36 6,790.87 6,716.87 -1,543.19 -1,719.16 5,936,327.987 673,196.114 0.74 2,309.64 7,675.00 46.43 231.48 6,808.13 6,734.13 -1,554.47 -1,73329 5,936,316.386 673,182.244 0.87 2,327.91 7,700.00 46.28 231.68 6,825.39 6,751.39 -1,565.71 -1,747.47 5,936,304.819 673,168.335 0.83 2,345.98 7,725.00 46.40 231.69 6,842.65 6,768.65 -1,576.92 -1,761.66 5,936,293.280 673,154.410 0.48 2,364.05 7,750.00 46.51 231.83 6,859.87 6,785.87 -1,588.14 -1,775.89 5,936,281.738 673,140.442 0.60 2,382.15 7,775.00 46.32 231.97 6,877.11 6,803.11 -1,599.31 -1790.14 5,936,270.238 673,126.455 0.86 2,400.24 7,800.00 46.47 231.97 6,894.35 6,820.35 -1,610.47 -1,804.40 5,936,258.758 673,112.459 0.60 2,418.32 7,825.00 46.54 232.04 6,911.55 6,637.55 A1621.63 -1,818.69 5,936,247.266 673,098.431 0.35 2,436.43 7,850.00 46.22 232.28 6,928.80 6,854.80 A,632.73 -1,832.99 5,936,235.836 673,084.400 1All 2,454.50 7,875.00 46.39 232.27 6,946.07 6,872.07 -1,643.79 -1,847.28 5,936,224.448 673,070.365 0.68 2,472.55 7,900.00 46.39 232.49 6,963.32 6,889.32 -1,654.84 -1,861.62 5,936,213.070 673,056.286 0.64 2,490.62 7,925.00 46.24 232.75 6,980.58 6,906.58 -1,665.82 -1,875.99 5,936,201.765 673,042.182 0.96 2,508.66 7,950.00 45.87 233.00 6,997.93 6,923.93 -1,676.68 -1,890.34 5,936,190.571 673,028.087 1.65 2,526.63 7,975.00 46.40 233.07 7,015.26 6,941.26 -1,687.52 -1,904.74 5,936,179.402 673,013.941 2.13 2,544.61 8,000.00 46.15 233.18 7,032.54 6,958.54 -1,698.36 -1,919.19 5,936,168.230 672,999.745 1.05 2,56263 8,025.00 46.30 233.21 7,049.83 6,975.83 -1,709.18 -1,933.65 5,936,157.083 672,985.547 0.61 2,580.63 8,050.00 46.30 233.37 7,067.10 6,993.10 -1,719.98 -1,948.13 5,936,145.947 672,971.313 0.46 2,598.66 8,075.00 45.99 233.52 7,084.42 7,010.42 -1,730.72 -1,962.62 5,936,134.878 672,957.086 1.31 2,616.63 8,100.00 46.10 233.48 7,101.78 7,027.78 -1,741A2 -1,977.08 5,936,123.841 672,942.872 0.45 2,634.58 8,125.00 46.14 233.75 7,119.11 7,045.11 -1,752.11 -1,991.59 5,936,112.818 672,928.618 0.79 2,652.54 8,150.00 45.90 233.85 7,136.47 7,062.47 -1,762.74 -2,006.11 5,936,101.861 672,914.352 1.00 2,67047 1002019 3:14 OOPM Page 10 COMPASS 5000.1 Build 81D BP by Final Survey Report Company. North America -ALASKA -BP Local Coordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB (d 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) () Wait) (waft) (waft) (waft) (usft) (usft) (°1100usft) (usft) 8,175.00 46.24 233.85 7,153.81 7,079.81 -1,773.36 -2,020.64 5,936,090.906 672,900.065 1.36 2,688.41 8,200.00 48.24 233.89 7,171.10 7,097.10 -1,784.00 -2,035.23 5,936,079.925 672,885.733 0.12 2,706.40 8,225.00 46.68 233.38 7,188.32 7,114.32 -1,794.75 -2,049.82 5,936,068.845 672,871.395 2.30 2,724.47 8,250.00 47.44 232.80 7,205.35 7,131.35 -1,805.74 -2,064.45 5,936,057.518 672,857.021 3.48 2,742.72 8,275.00 47.68 232.34 7,222.22 7,148.22 -1,816.95 -2,079.10 5,936,045.968 672,842.636 1.66 2,761.14 8,300.00 48.01 232.27 7,239.00 7,165.00 -1,828.29 -2,093.77 5,936,034.299 672,828.238 1.34 2,779.64 8,325.00 48.51 232.15 7,255.65 7,181.65 -1,839.72 -2,108.51 5,936,022.531 672,813.767 2.03 2,798.27 8,350.00 48.54 232.13 7,272.20 7,198.20 -1,851.21 -2,123.30 5,936,010.696 672,799.250 0.13 2,816.97 8,375.00 48.82 232.27 7,288.71 7,214.71 -1,862.72 -2,138.14 5,935,998.848 672,784.686 1.20 2,835.72 8,400.00 48.95 231.86 7,305.15 7,231.15 -1,874.30 -2,152.99 5,935,986.928 672,770.104 1.34 2,854.53 8,425.00 48,96 230.99 7,321.57 7,247.57 -1,886.08 -2,167.73 5,935,974.834 672,755.641 2.62 2,873.37 8,450.00 49.51 230.56 7,337.89 7,263.89 -1,898.03 -2,182.40 5,935,962.526 672,741.254 2.53 2,892.29 8,475.00 49.65 230.17 7,354.10 7,280.10 -1,910.17 -2,197.06 5,935,950.052 672,726.881 1.37 2,911.32 8,500.00 49.59 229.76 7,370.30 7,296.30 -1,922,42 -2,211.64 5,935,937.467 672,712.588 1.27 2,930.36 8,525.00 49.85 229.43 7,386.46 7,31246 -1,934.78 -2,226.17 5,935,924.772 672,698.357 1.45 2,949.44 8,550.00 49.72 229.29 7,402.60 7,328.60 -1,947.21 -2,240.65 5,935,912.007 672,684.164 0.67 2,968.5? 8,575.00 49.59 229.60 7,418.79 7,344.79 -1,959.60 -2,255.13 5,935,899.267 672,669.979 1.08 2,987.58 8,600.00 49.93 229.97 7,434.94 7,360.94 -1,971.92 -2,269.70 5,935,886.632 672,655.697 1.77 3,006.66 8,625.00 49.90 230.43 7,451.03 7,377.03 -1,984.17 -2,284.40 5,935,874.051 672,641.291 1.41 3,025.78 8,650.00 50.13 230.87 7,467.10 7,393.10 -1,996.31 -2,299.21 5,935,861.567 672,626.765 1.63 3,044.93 8,675.00 50.31 231.27 7,483.09 7,409.09 -2,008.38 -2,314.15 5,935,849.151 672,612.104 1.42 3,064.13 8,700.00 50.02 231.50 7,499.11 7,425.11 -2,020.36 -2,329.15 5,935,836.827 672,597.387 1.36 3,083.32 8,725.00 50.02 231.61 7,515.17 7,441.17 -2,032.28 -2,344.16 5,935,824.572 672,582.664 0.34 3,102.45 8,750.00 49.65 231.37 7,531.30 7,457.30 -2,044.17 -2,359.11 5,935,812.334 672,567.996 1.85 3,12154 8,775.00 49.11 231.38 7,547.57 7,473.57 -2,056.02 -2,373.93 5,935,800.149 672,553.450 2.16 3,140.50 8,800.00 48.79 231.22 7,563.99 7,489.99 -2,067.80 -2,388.65 5,935,788.023 672,539.015 1.37 3,159.34 8,825.00 48.33 231.13 7,580.54 7,506.54 -2,079.55 -2,403.25 5,935,775.939 672,524.692 1.86 3,178.07 10/82019 3.14:00PM Page 11 COMPASS 5000.1 Build 81D HE BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS Fill Northing Easting DLeg V. Sec (usft) O V) (usft) (usft) (usft) (usft) (usft) (usft) ("1100usft) (usft) 8,850.00 48.13 231.29 7,597.19 7,523.19 -2091.23 -2417.78 5,935,763.925 672,510.434 0.93 3,19670 8,875.00 47.80 231.09 7,613.93 7,539.93 -2,102.87 -2432.25 5,935,751.956 672,496.240 1.45 3,215.26 8,900.00 47.68 231.19 7,630.74 7,556.74 -2,114.48 -2,446.66 5,935,740.017 672,482.106 0.56 3,233.75 8,925.00 47.27 231.13 7,647.64 7,573.64 -2,126.04 -2,461.01 5,935,728.133 672,468.028 1.65 3,252.16 8,950.00 47.13 231.24 7,664.63 7,590.63 -2,137.53 -2,475.30 5,935,716.308 672,454.007 0.65 3,270.49 8,975.00 46.91 231.24 7,681.67 7,607.67 -2,148.98 -2,489.56 5,935,704.530 672,440.015 0.88 3,288.77 9,000.00 46.53 231.35 7,698.81 7,624.81 -2,160.36 -2,503.77 5,935,692.824 672,426.081 1.55 3,306.95 9,025.00 46.43 231.57 7,716.02 7,642.02 -2,171.66 -2,517.94 5,935,681.204 672,412.168 0.75 3,325.07 9,050.00 46.10 231.70 7,733.31 7,659.31 -2,182.87 -2,532.11 5,935,669.668 672,398.270 1.37 3,343.11 9,075.00 45.79 231.95 7,750.69 7,676.69 -2,193.98 -2,546.23 5,935,658.239 672,384.408 1.43 3,361.06 9,100.00 45.72 232.22 7,768.13 7,694.13 -2,204.98 -2,560.36 5,935,646.910 672,370.539 0.82 3,378.94 9,125.00 45.43 232.30 7,785.63 7,711.63 -2,215.91 -2,574.48 5,935,635.658 672,356.678 1.18 3,396.77 9,150.00 45.06 232.31 7,803.23 7,729.23 -2,226.76 -2,588.53 5,935,624.481 672,342.887 1.48 3,414.49 9,175.00 45.15 232.55 7,820.88 7,746.88 -2,237.56 -2;602.56 5,935,613.361 672,329.105 0.77 3,432.17 9,200.00 44.82 232.59 7,838.56 7,764.56 -2,248.30 -2,616.60 5,935,602.297 672,315.325 1.32 3,449.81 9,225.00 44.60 232.70 7,856.33 7,782.33 -2,258.98 -2,630.58 5,935,591.305 672,301.596 0.93 3,467.37 9,250.00 44.49 232.86 7,874.15 7,800.15 -2,269.58 -2,644.54 5,935,580.377 672,287.882 0.63 3,464.87 9,275.00 44.05 233.05 7,892.05 7,818.05 -2,280.10 -2,658.47 5,935,569.544 672,274.202 1.84 3,502.28 9,300.00 44.00 233.44 7,910.02 7,836.02 -2,290.49 -2,672.39 5,935,558.828 672,260.528 1.10 3,519.61 9,325.00 43.38 233.61 7,928.10 7,854.10 -2,300.76 -2,686.28 5,935,548.244 672,246.884 2.52 3,536.82 9,350.00 42.97 234.D7 7,946.33 7,872.33 -2,310.85 -2,700.09 5,935,537.834 672,233.313 2.07 3,553.87 9,375.00 42.60 235.32 7,964.68 7,890.68 -2,320.67 -2,713.95 5,935,527.702 672,219.688 3.70 3,570.77 9,400.00 42.10 235.42 7,983.16 7,909.16 -2,330.24 -2,727.80 5,935,517.813 672,206.056 2.02 3,587.51 9,425.00 41.75 235.53 8,001.76 7,927.76 -2,339.70 -2,741.57 5,935,508.030 672,192.519 1.43 3,604.11 9,450.00 41.56 235.95 8,020.44 7,946.44 -2,349.06 -2,755.30 5,935,498.360 672,179.007 1.35 3,620.61 9,475.00 41.07 236.23 8,039.21 7,965.21 -2,358.27 -2,769.00 5,935,488.838 672,165.528 2.09 3,636.99 9,500.00 41.10 236.61 8,058.06 7,984.06 -2,367.35 -2,782.68 5,935,479.436 672,152.056 1.01 3,653.29 1OW019 3:14:OOPM Page 12 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-38 Project: PBU TVD Reference: KS @ 74.00usff (61 : 3810/4/1988 00:00) Site: 14 MD Reference: KB Q 74.00usft (61 : 3810/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting OLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (1100us11) (usft) 9,525.00 40.77 238.97 8,076.94 8,002.94 -2,376.33 -2,796.39 5,935,470.150 672,138.564 1.62 3,669.52 9,550.00 40.65 237.16 8,095.89 8,021.89 -2,385.19 -2,810.07 5,935,460.970 672,125.089 0.69 3,685.67 9,575.00 41.40 237.14 8,114.75 8,040.75 -2,394.09 -2,823.86 5,935,451.752 672,111.514 3.00 3,701.91 9,600.00 42.43 237.01 8,133.36 8,059.36 -2,403.17 -2,837.88 5,935,442.352 672,097.711 4.13 3,71845 9,625.00 43.45 236.70 8,151.66 8,077.66 -2,412.48 -2,852.14 5,935,432.713 672,083.673 4.17 3,735.32 9,650.00 45.31 236.43 8,169.53 8,095.53 -2,422.12 -2,866.73 5,935,422.743 672,069.310 7.48 3,752.66 9,675.00 46.72 236.45 8,186.89 6,112.89 -2,432.06 -2,881.72 5,935,412.455 672,054.557 5.64 3,770.50 9,700.00 47.75 236.39 8,203.86 8,129.86 -2,442.21 -2,897.01 5,935,401.953 672,039.507 4.12 3,788.70 9,725.00 49.22 236.49 8,220.43 8,146.43 -2,452.56 -2,912.61 5,935,391.247 672,024.153 5.89 3,807.26 9,750.00 49.68 236.68 8,236.68 8,162.68 -2,463.02 -2,928.46 5,935,380.419 672,008.547 1.91 3,826.10 9,775.00 50.48 237.04 8,252.73 8,178.73 -2,473.51 -2,944.51 5,935,369.566 671,992.743 3.41 3,845.09 9,800.00 51.13 237.60 8,268.53 8,194.53 -2,483.97 -2,960.82 5,935,358.730 671,976.683 3.13 3,864.27 9,825.00 50.78 237.91 8,284.27 8,210.27 -2,494.33 -2,977.24 5,935,347.993 671,960.507 1.70 3,883.46 9,850.00 50.65 238.09 8,300.10 8,226.10 -2,504.58 -2,993.65 5,935,337.362 671,944.340 0.76 3,902.58 9,875.00 50.18 238.04 8,316.03 8,242.03 -2,514.77 -3,010.00 5,935,326.795 671,928.231 1.89 3,921.61 9,900.00 49.71 238.06 8,332.12 8,258.12 -2,524.90 -3,026.24 5,935,316.296 671,912.235 1.88 3,940.5' 9,925.00 49.40 238.71 8,348.34 8,274.34 -2,534.87 -3,042.44 5,935,305.950 671,896.270 2.34 3,959.28 9,950.00 48.87 238.68 8,364.70 8,290.70 -2,544.70 -3,058.60 5,935,295.755 671,880.349 2.12 3,977.92 9,975.00 48.43 238.34 8,381.21 8,307.21 -2,554.50 -3,074.60 5,935,285.584 671,864.578 2.03 3,996.44 10,000.00 48.38 238.93 8,397.81 8,323.81 -2,564.23 -3,090.56 5,935,275.486 671,848.845 1.78 4,014.87 10,025.00 47.62 238.92 8,414.54 8,340.54 -2,573.82 -3,106.48 5,935,265.531 671,833.161 3.04 4,033.18 10,050.00 46.89 239.18 8,431.51 8,357.51 -2,583.26 -3,122.22 5,935,255.726 671,817.640 3.02 4,051.26 10,075.00 46.96 239.70 8,448.58 8,374.58 -2,592.55 -3,137.95 5,935,246.080 671.802A35 1.54 4,069.22 10,100.00 46.31 239.26 8,465.75 8,391.75 -2,601.78 -3,153.60 5,935,236.491 671,786.698 2.90 4,087.10 10,125.00 45.64 239.61 8,483.12 8,409.12 -2,610.92 -3,169.08 5,935,226.993 671,771.437 2.86 4,104.78 10,150.00 45.35 239.60 8,500.65 8,426.65 -2,619.94 -3,184.46 5,935,217.619 671,756.272 1.16 4,122.31 10,175.00 44.84 240.49 8,518.29 8,444.29 -2,628.78 -3,199.80 5,935,208.424 671,741.141 3.24 4,139.69 10/8/2019 3:14:OOPM Page 13 COMPASS 5000.1 Build SID by BP Final Survey Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCPt Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (waft) (°1100usft) (U$R) 10,200.00 44.28 240.49 6,536.11 8,462.11 -2,63742 -3,215.07 5,935,199.433 671,726.081 2.24 4,156.89 10,225.00 44.26 240.71 8,554.01 8,480.01 -2,645.99 -3,230.27 5,935,190.516 671,711.081 0.62 4,173.99 10,250.00 43.29 241.14 8,572.06 8,498.06 -2,654.39 -3,245.38 5,935,181.763 671,696.166 4.06 4,190.91 10,27500 42.72 240.00 8,590.34 8,516.34 -2,662.77 -3,260.24 5,935,173.044 671,681.514 3.86 4,207.62 10,300.00 42.94 240.70 8,608.68 8,534.68 -2,671.18 -3,275.01 5,935,164.297 671,666.944 2.10 4,224.29 10,325.00 41.66 241.89 8,62217 8,553.17 -2,679.26 -3,289.76 5,935,155.875 671,652.380 6.04 4,240.73 10,350.00 41.01 241.57 8,645.94 8,571.94 -2,687.08 -3,304.30 5,935,147.720 671,638.024 2.73 4,256.84 10,375.00 40.61 241.82 8,564.86 8,590.86 -2,694.83 -3,318.69 5,935,139.642 671,623.824 1.73 4,272.78 10,400.00 40.41 242.24 8,683.87 8,609.87 -2,702.44 -3,333.03 5,935,131.695 671,609.663 1.35 4,288.61 10,425.00 39.69 242.49 8,703.01 8,629.01 -2,709.91 -3,347.28 5,935,123.906 671,595.589 2.95 4,304.27 10,450.00 39.51 242.99 8,722.27 8,648.27 -2,717.20 -3,361.45 5,935,116.281 671,581.598 1.46 4,31975 10,475.00 39.48 243.01 8741.56 8,667.56 -2,724.42 -3,375.62 5,935,108.736 671,567.603 0.13 4,335.18 10,500.00 39.35 243.41 8760.87 8,686.87 -2,731.58 -3,389.78 5,935,101.255 671,553.604 1.14 4,350.57 10,525.00 39.23 243.80 8780.22 8,706.22 -2,738.62 -3,403.97 5,935,093.891 671,539.591 1.10 4,365.90 10,550.00 38.96 244.22 8,799.63 8,725.63 -2,745.52 -3,418.14 5,935,086.656 671,525.585 1.51 4,381.13 10,575.00 38.75 244.78 8,819.09 8,745.09 -2,752.28 -3,432.29 5,935,079.578 671,511.591 1.64 _ 4,396.2: 10,600.00 38.64 244.97 8,838.61 8,764.61 -2,758.91 -3,446.44 5,935,072.616 671,497.599 0.65 4,411.29 10,625.00 38.60 245.13 8,858.14 8,784.14 -2,765.49 -3,460.59 5,935,065.708 671,483.609 0.43 4,42629 10,650.00 38.18 245.16 8,877.73 8,803.73 -2,772.02 -3,474.68 5,935,058.858 671,469.678 1.68 4,44121 10,675.00 37.75 245.18 8,897.44 8,823.44 -2,77848 -3,488.64 5,935,052.078 671,455.874 1.72 4,455.98 10,700.00 37.71 245.20 8,917.22 6,843.22 -2,784.90 -3,502.52 5,935,045.338 671,442.141 0.17 4,470.68 Tte in to parent well 14-38 10,726.00 37.62 245.25 8,937.80 8,863.80 -2,791.56 -3,516.95 5,935,038.349 671,427.876 0.37 4,485.94 KOP-Top of Whipstock 10,742.81 41.28 239.76 8,950.78 8,876.76 -2,796.50 -3,526.40 5,935,033.187 671,418.538 30.06 4,496.32 Interpolated Azimuth 10,771.65 47.67 232.75 8,971.36 8,897.36 -2,807.76 -3,543.13 5,935,021.540 671,402.072 27.92 4,516.34 Interpolated Azimuth 10/8/2019 3:14:OOPM Page 14 COMPASS 5000.1 Build 810 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: PBU ND Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi ND 7VDSS WS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°ItOgusft) (usft) 10,801.91 53.91 226.76 8,990.49 8,916.49 -2,822.93 -3,560.97 5,935,005.962 671,384.592 25.68 4,539.76 First Good Survey 10,831.54 59.66 214.08 9,006.76 8,932.76 -2,841.79 3,576.92 5,934,986.738 671,369.090 40.67 4,564.16 10,861.74 69.12 209.80 9,019.81 6,945.81 -2,864.89 -3,591.27 5,934,963.315 671,355.279 33.82 4,590.14 10,891.89 79.12 205.32 9,028.05 8,954.05 -2,890.57 -3,604.84 5,934,937.332 671,342.507 36.11 4,617.06 10,921.83 86.83 198.61 9,031.71 8,957.71 -2,918.10 -3,615.73 5,934,909.557 671,332.063 34.02 4,643.47 10,951.81 94.89 192.75 9,031.26 8,957.26 -2,946.92 -3,623.82 5,934,880.555 671,324.641 33.23 4,668,47 10,980.46 101.73 186.70 9,027.12 8,953.12 -2,974.83 -3,628.62 5,934,852.543 671,320.493 31.72 4,690.38 11,010.56 101.91 190.16 9,020.95 8,946.95 -3,003.97 -3,632.93 5,934,823.314 671,316.852 11.27 4,712.73 11,040.61 101.21 193.94 9,014.93 8,940.93 -3,032.76 -3,639.08 5,934,794.396 671,311.376 12.54 4,736.23 11,070.71 101.41 197.43 9,009.02 8,935.02 -3,061 A7 -3,647.06 5,934,765.809 671,304.060 11.39 4,760.87 11,100.47 100.96 200.69 9,003.25 8,929.25 -3,088.76 -3,656.59 5,934,738.007 671,295.170 10.85 4,786.15 11,130.36 100.47 204.70 8,997.69 8,923.69 -3,115.85 -3,667.92 5,934,710.665 671,284.472 13.28 4,812.46 11,160.70 101.20 207.54 8,991.98 8,917.98 -3,142.60 -3,681.04 5,934,683.616 671,271.980 9.50 4,839.89 11,190.72 101.09 210.60 8,986.18 8,912.18 -3,168.34 -3,895.35 5,934,657.553 671,258.273 10.01 4,867.57 11,220.56 99.62 213.69 8,980.82 8,906.82 -3,193.19 -3,710.96 5,934,632.350 671,243.237 11.31 4,895.65 11,251.00 96.89 215.06 8,976.45 8,902.45 -3,218.05 -3,727.97 5,934,607.104 671,226.811 10.01 4,924.78 11,280.70 94.33 216.74 8,973.54 8,899.54 -3,241.99 -3,745.30 5,934,582.770 671,210.042 10.29 4,953,56 11,310.91 92.00 218.76 8,971.87 8,897.87 -3,265.84 -3,763.77 5,934,558.503 671,192.136 10.20 4,983.13 11,340.90 92.43 221.95 8,970.72 8,896.72 -3,288.67 -3,783.17 5,934,535.227 671,173.270 10.73 5,012.75 11,371.05 92.84 226.67 8,969.38 8,895.38 -3,310.22 -3,804.20 5,934,513.199 671,152.742 15.66 5,042.76 11,404.35 93.07 232.38 8,967.72 8,893.72 -3,331.80 -3,829.49 5,934,491.040 671,127.962 17.17 5,076.00 11,430.81 93.13 235.38 8,966.29 8,892.29 -3,347.37 -3,850.83 5,934,474.977 671,106.990 11.32 5,102.33 11,460.63 92.73 240.11 8,964.76 8,890.76 -3,363.26 -3,876.01 5,934,458.509 671,082.189 15.90 5,131.76 11,490.67 92.64 244.83 8,963.36 8,889.36 -3,377.12 -3,902.61 5,934,444.032 671,055.918 15.70 5,160.94 11,520.61 92.89 248.88 8,961.91 8,887.91 -3,388.88 -3,930.11 5,934,431.646 671,028.707 13.54 5,18941 11,552.29 92.89 255.94 8,960.31 8,886.31 -3,398.43 -3,960.25 5,934,421.394 670,998.798 22.26 5,218.44 10/82019 3:14:OOPM Page 15 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc An TVD TVDSS N/S E/W Northing Fasting DI -eq V. See (usft) N V) (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft _ 11,580.39 92.15 255.47 8,959.08 8,885.08 -3,405.36 -3,987.45 5,934,413.834 670,971.764 3.12 5,243.54 11,610.32 88.50 255.30 6,958.91 8,884.91 -3,412.91 -4,016.41 5,934,405.615 670,942.993 12.21 5,270.36 11,640.51 86.52 254.57 8,960.22 8,886.22 -3,420.75 -4,045.53 5,934,397.103 670,914.061 6.99 5,297.50 11,670.52 85.73 248.86 8,962.25 8,888.25 -3,430.14 -4,073.95 5,934,387.058 670,885.871 19.16 5,325.12 11,701.26 88.04 246.01 8,963.92 8,889.92 -3,441.92 -4,102.29 5,934,374.627 670,857.814 11.92 5,354.25 11,730.38 87.91 243.04 8,964.95 8,890.95 -3,454.44 -4,128.56 5,934,361.507 670,831.843 10.20 5,382.29 11,760.40 88.00 240.22 8,966.02 8,892.02 -3,468.69 -4,154.95 5,934,346.645 670,805.788 9.39 5,411.57 11,790.24 86.95 238.46 8,967.33 8,893.33 -3,483.89 -4,180.59 5,934,330.855 670,780.506 6.86 5,440.91 11,820.30 86.44 234.31 8,969.07 8,895.07 -3,500.50 4,205.58 5,934,313.671 670,755.914 13.89 5,470.66 11,850.25 87.54 230.28 8,970.64 8,896.64 -3,518.79 4,229.24 5,934,294.840 670,732.688 13.93 5,500.52 11,880.61 87.67 228.00 8,971.91 8,897.91 -3,539.03 -4,251.82 5,934,274.086 670,710.579 14.09 5,530.84 11,910.47 87.12 222.72 8,973.27 8,899.27 -3,560.35 4,272.68 5,934,252.286 870,690.228 11.13 5,560.57 11,940.41 85.95 218.82 8,975.08 8,901.08 -3,582.98 4;292.19 5,934,229.213 670,671.247 13.58 5,590.13 11,970.51 86.25 215.35 8,977.13 8,903.13 -3,608.93 4,310.29 5,934,204.848 670,653.703 11.54 5,619.50 12,000.56 85.97 211.41 8,979.17 8,905.17 -3,631.96 -4,326,79 5,934,179.444 670,637.797 13.11 5,648.36 12,030.40 83.85 208.23 8,981.81 8,907.81 -3,657.74 4,341.56 5,934,153.329 670,623.621 12.77 5,676.42 12,060.14 83.79 204.28 8,985.02 8,911.02 -3,884.25 4,354.64 5,934,126.523 670,611.163 13.21 5,703.67 12,090.27 83.57 203.28 8,988.33 8,914.33 -3,711.66 4,366.72 5,934,098.848 670,599.728 3.38 5,730.74 12,120.74 87.51 204.59 8,990.70 8,916.70 -3,739.42 4,379.04 5,934,070.813 670,588.053 13.62 5,758.24 12,150.96 90.28 206.55 8,991.29 8,917.29 -3,766.67 4,392.08 5,934,043.268 670,575.650 11.23 5,785.94 12,180.83 94.49 209.07 8,990.05 8,916.05 -3,792.88 4,405.90 5,934,016.744 670,562.438 16.53 5,813.56 12,210.42 95.41 213.17 8,987.48 8,913.48 -3,818.28 4,421.24 5,933,990.994 670,547.697 14.05 5,841.79 12,240.60 94.55 210.58 8,984.86 8,910.86 -3,843.81 -4,437.11 5,933,965.105 670,532.419 9.01 5,870.51 12,272.11 94.70 217.58 8,982.31 8,908.31 -3,869.81 4,454.70 5,933,938.708 670,515.440 22.15 5,900.83 12,300.61 94.86 218,43 8,979.94 8,905.94 -3,892.19 4,472.19 5,933,915.932 670,498.478 3.02 5,928.70 12,330.57 95.99 223.22 8,977.11 8,903.11 -3,914.75 4,491.68 5,933,892.924 670,479.516 16.36 5,95821 12,360.25 94.52 226.26 8,974.39 8,900.39 -3,935.74 4,512.48 5,933,871.459 670,459.208 11.34 5,987.67 10/&2019 3:14:OOPM Page 16 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 14-38 Project: PBU TVD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Site: 14 MD Reference: KB @ 74.00usft (61 : 38 10/4/1988 00:00) Well: 14-38 North Reference: True Wellbore: 14-38A Survey Calculation Method: Minimum Curvature Design: 14-38A Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi TVD NDSS NIS EIW Northing Easting DLeg V. Sec (usft) (•) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,392.29 91.38 227.58 8,972.74 8,898.74 -3,957.59 -4,535.85 5,933,849.073 670,436.355 10.63 6,019.64 12,425.01 91.20 230.42 8,972.00 8,898.00 -3,979.05 -4,560.53 5,933,827.049 670,412.176 8.69 6,052.35 12,450.28 88.74 230.26 8,972.01 8,898.01 -3,995.18 -4,579.99 5,933,810.477 670,393.104 9.76 6,077.61 12,480.27 84.87 231.45 8,973.69 8,899.69 -4,014.08 4,603.20 5,933,791.045 670,370.332 13.50 6,10754 12,510.16 82.82 233.66 8,976.89 8,902.89 -4,032.14 -4,628.79 5,933,772.437 670,347.168 10.05 6,137.20 12,540.77 83.23 237.15 8,980.61 8,906.61 4,049.39 4,651.80 5,933,754.615 670,322.569 11.40 6,167.39 12,570.58 84.01 239.75 8,983.92 8,909.92 4,064.89 4,677.05 5,933,738.536 670,297.693 9.05 6,196.62 12,600.26 87.73 242.29 8,986.06 8,912.06 4,079.23 4,702.94 5,933,723.602 670,272.144 15.16 6,225.57 12,630.35 87.36 246.76 8,987.35 8,913.35 4,092.16 4,730.07 5,933,710.050 670,245.320 14.89 8,254.54 12,660.78 88.19 248.94 8,988.53 8,914.53 -4,103.62 4,758.23 5,933,697.938 670,217.434 7.66 8,283.32 12,690.30 86.99 247.25 8,989.77 8,915.77 -4,114.62 4,785.59 5,933,686.304 670,190.336 7.02 6,311.20 12,720.63 83.67 245.41 8,992.24 8,918.24 4,126.75 4,813.27 5,933,673.534 670,162.945 12.50 6,340.07 12,751.05 80.46 244.15 8,996.44 8,922.44 -4,138.59 4,840.53 5,933,660.071 670,135.998 11.32 6,369.07 12,780.81 77.13 242.14 9,002.22 8,928.22 -4,152.77 4,686.57 5,933,646290 670,110.272 13.00 6,397.38 12,810.35 74.06 239.78 9,009.57 8,935.57 4,166.65 4,891.58 5,933,631.832 670,085.591 12.96 6,425.37 12,831.46 74.45 237.29 9,015.30 8,941.30 4,177.26 4,908.91 5,933,620.829 670,068.514 11.50 6,445.41 12,872.00 74.45 237.29 9,026.17 8,952.17 4,198.36 4,941.77 5,933,598.968 670,036.152 0.00 6,484.06 Projection to TD 10/82019 3: 14:OOPM Page 17 COMPASS 5000.1 Build 81D PM)Wt: PBU iMeunWEU ws�.rcxm ns. EDETAILS: 143 REFFRDICEwWMMilkl SRa: 14 rxymkr.ie 14384 �imae'. ww lCY,i�ueWM 1438 W(NWell: @I:MIWCNB0M) Mlllw:14384 Dp° kB0 438 swciRfOuwsIm. 0.3ncR.O.w) al: 144M tl 6ro9WA �"aoinRelmKB®14m16t: TmmMD700.00 a�s ma: AOGCC - Offsets within 500ft Fasting (2110 usNin) North America - ALASKA - BP PBU 14 14-38 14-38A 14-38A 500292186201 AOGCC Offset Well Report 08 October, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: 14 Site Error: 0.00usft Reference Well: 14-38 Well Error: O.00usft Reference Wellbore 14-38A Reference Design: 14-38A BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVO Reference: Well 14-38 KB @ 74.00usft (61 : 38 10/4/1988 00:00) KB @ 74.00usft (61 : 38 10/4/1988 00:00) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-38A Filter type: NO GLOBAL FILTER: Using user defined selection B fRenng criteria Reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 10/8/2019 From To Reference (usft) (usft) Sumey(Wellbors) Tool Name Description 100.00 10,700.00 GymData Gyro (14-38) GYD-CT-CMS Gymdata cont.casing mls 10,72600 12,872.00 Survey#1 (14-38A) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) 14 14-06 - 14-06 - 14-06 4,765.87 5,100.00 335.00 14-06 - 14-06A- 14-OGA 4,765.87 5,100.00 335.00 14-17 - 14-17 - 14-17 2,603.12 2,800.00 73.24 14 -17 -14 -17A -14-17A 2,603.12 2,600.00 73.24 14-17 - 14-17A- Plan #3 2,603.12 2,600.00 73.24 14-21 - 14-21 - 14-21 2,078.55 2,075.00 298.66 14 -21 -14 -21A -14-21A 2,078.79 2,075.00 298.66 14-21 - 14-21 A- 14-21A wpO8 2,078.78 2,075.00 298.66 14-22 - 14-22 - 14-22 1,853.25 1,850.00 190.19 14-22- 14-22A- 14-22A 1,853.25 1,850.00 190.19 14-22 - 14-22B - 14-22B 32.22 32.22 180.10 14-22 - 14-22B - 14-22B 1,842.35 1,850.00 190.04 14-37 - 14-37 - 14-37 3,471.66 3,475.00 53.69 14-39 - 14-39 - 14-39 2,000.09 2,000.00 122.40 14-40 - 14-40 - 1440 2,025.24 2,025.00 248.05 1440 - 14-40A- 14-40A 2,025.24 2,025.00 248.05 1440 - 14-40A- Plan #1 2,025.24 2,025.00 248.05 1444 - 14-44 - 1444 877.20 875.00 14.35 1444 - 14-44A- 1444A 879.16 875.00 14.37 1444 - 14-44AL1 - 1444AL1 Plan 3 879.16 875.00 14.37 1444 - 14-44APB1 - 1444A wpO8 879.16 875.00 14.37 1444 - 14-44APB1 - 1444APBI 879.16 875.00 14.37 1444 - 14-44PB1 - 1444PB1 877.20 875.00 14.35 Plan 1445 - Plan 1445 - 1445 wpO5 3,415.57 3,575.00 261.05 X X-09 - X-09 - X-09 12,871.65 12,750.00 406.06 10/8/2019 3:49:04PM Page 2 of 2 COMPASS 5000 1 Build 81D ) \o0 _ 0 EO ƒ k 22 a. `(§§§§k® \ 2kI ƒ$ .... . : !a#!a;/ ,2 };� y_\ )\§\§§j `� { 7` �))� ' Ly 0 { _ . : /||x - );( \/t# � - �k gL \#D { i ) \f ) /\)/: {/ƒ{ } \/ 0 f `�� )!! \ §\\ \ k ai � /!§ \�2 \ :\\\\ aj )( !` . )(§(k)2 !�— z 7 ! ) }? � \\\� ��/ t\\0° {) § ! _ - �!; 21 -[»))�( 2| al;22 - :� _ No 00 00 ) z z 0 (/ ) - � \EL CL- *t&2 $/ § !I!! §� { �}§\)w « a z �\\\\ ±!# );/\ ` ` /ƒ� 0 j \�4 �I \ } z \ ! z2\0D \\\\) \k/ )` \/o\}/( Baker g Hughes PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc. WELL NAME 14-38A FIELD Prudhoe Bav Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Pathck.RlderPbllge.COm STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V LOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 No 219098 3 142 1 Ise sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, L12-1 1 E. Benson Blvd. :h, AK 99508 or GANCPDC@bp365.onmicrosoft.com LOG TYPE GR- RES LOG DATE October 7, 2019 TODAYS DATE November 7, 2019 Revision Details: Rev. Requested by: --- FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, I SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES #QFCOPIES # OF COPIES 111 2 ConocoPhillipsAlaska Inc. 1 1 Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 A 3 ExxonMobil, Alaska 1 V Attn: Lynda M. Yaskell and/or Leonardo Elias NOV O 3201 C Street, Suite 505 .tc, Anchorage, AK 99503 oG CC /1 4 State of Alaska - AOGCC 1 1 /`I` Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas a** 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 •" Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Nancy Landi TOTALS FOR THIS PAGE: 0 1 4 1 0 THE STATE OIALASKA GOVERNOR MIKE DUNLEAVY Sean M. McLaughlin Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 14-38A BP Exploration (Alaska), Inc, Permit to Drill Number: 219-088 Surface Location: 2421' FNL, 1623' FEL, SEC. 09, R14E, UM Bottomhole Location: 1493' FNL, 1324' FEL, SEC. 17, R14E, UM Dear Mr. McLaughlin: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 v .aogcc.alaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, n J sie L�Chm elowskiki Commissioner DATED this 13 day of June, 2019. Rll— EEG VV_n STATE OF ALASKA i ASKA OIL AND GAS CONSERVATION COMMIS{ PERMIT TO DRILL 20 AAC 25.005 la. Type of Work: 1b. Proposed Well Class: Exploratory - Gas [I Service -WAG ❑ Service - Disp I] 1c. Specify if well is proposed for. Drill ❑ Lateral ❑ StreBgraphic Test ❑ Development -Oil 0 Service - Will ❑ Single Zone 0 Coalbed Gas ❑ Gas Hydrates ❑ Redrill 0 Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 Single Well ❑ 11. Well Name and Number. BP Exploration (Alaska), Inc Bond No. 295105380 , PBU 14-38A 3 Address: -TVD • 90 6. Proposed Depth: 610 12, Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 ,1 MD: 12941' ! 1 ND. •8966'ss PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): ADL 028312, 028314 & 047475 8. DNR Approval Number: 13. Approximate spud date' Surface: 2421' FNL, 1623' FEL, Sec. 09, T10N, R14E, UM 5213' FNL. 5147' FEL, Sec. 09, T10N, R14E, UM 77-043 August 1, 2019 Top of Productive Horizon: 9. Acres in Property: 2560 & 2512 14Distance to Nearest Property: Total Depth: 1493' FNL, 1324' FEL, Sec. 77, T10N, R74E, UM 9135 4b, Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: , 74.0 feet 15. Distance to Nearest Well Open Surface: x- 674879 y- 5937911 Zone - ASP 4 GL Elevation above MSL: 43.01 feet 51Same Pool: 16. Deviated wells. Kickoff Depth: 10731 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 102 degrees Downhole: 3400 Surface: 2520 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weioht Grade I Cou lin Len h MD TVD M12 TVD including stage data) 4-1/4" 3-1/7'x3-1/4" 931#6.6# 13CB0 STL/TCII 2510' 10430' 8633'ss 12940' 8966'ss 173 sx Class'G' X2-7/8" /6.5# /STL 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 11182 9279 None 11048 9180 10775,10796,10853,11018 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20' 2150# Poleset 34-114 34-114 Surface 3746 133/8" 2000 sx CS Ill. 600 ax Class'G', 125 sx CS II 34-3480 34-3480 Intermediate 10675 9-5/8" B80 sx Class'G' 32-10707 32-8923 Production Liner 788 7" 257 ax Class'G' 10394 - 11182 8679-9279 Perforation Depth MD (ft): 10608 - 10858 Perforation Depth TVD (ft): 8845-9038 Hydraulic Fracture planned? Yes ❑ No 0 . 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Hvaft. Trevor from without prior written approval. Contact Email Trevor.Hyattabp.cem Authorized Name Mclaughlin, Sean M Authorized Title En 'Bering Team Lead - CTD Contact Phone *1 907 564 4627 / Authorized Signature I Date 6 O jq Commission Use Only Permit to Drillq �� 8 ✓ Di Permit Approv, See cover letter for other Number: `9 – UQ V Dp API : 50- 029-21862-01-00 Date: ' requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 0 Other:B O PE 1 G'St -TZ) -_5�0 �s ' Samples req'd: Yes ❑ No e Mud log req'd: Yes ❑ No B/ "``t;�N H2S measures Yes Cd" No ❑ Directional svy req'd: Yes G3' No ❑ Spacing exception req'd: Yes ❑ No 123o/ Inclination -only svy req'd: Yes ❑ No 9' ,a,pDT0.J¢6y a�>7`r� NCL.4t 7 1 Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: 0.401 Redsetl5/2017 0 I G I N A L Form 1Submit Form and This permit is valid for 24 mont s from the date of approval (20 AAC 25.005(9)) Attachments in Duplicate y Rn?r te'AB 6.1111lot To: Alaska Oil & Gas Conservation Commission ,'♦/� 11 From: Trevor Hyatt 4& 41by CTD Engineer iej`♦,%VA Date: June 10, 2019 Re: 14-38A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well 14-38 with the Nabors CDR2 Coiled Tubing Drilling rig on or around August 1`t, 2019. Proposed plan for 14-38A: A 2,200' coil tubing drilling sidetrack will be drilled with the Nabors CDR2 rig. Prior to sidetrack, a flowback is planned for "'S days to confirm well integrity when the well is warm and flowing. The whipstock will be set pre -rig in the 7" liner. Then the rig will move in, test BOPE and kill the well. A 3.80" window+ 10' of rathole will be milled. The well will kick off in the Zone 4, with minor undulations planned in the 46P oil column. The well bore toes down towards the interpreted OWC at TD. The proposed sidetrack will be completed with a 3-1/2" x 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place and selectively perforated. This completion will completely isolate and abandon the parent Ivishak perfs. Rig Work (scheduled to begin August 1, 2019) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP: 2520 psi). 2 y ro 2. Mill 3.80" Window+ 10' of rathole 3. Drill build section: 4.25" OH, ^240' (30 deg DLS planned). 4. Drill lateral section: 4.25" OH, `1965' (12 deg DLS planned). S. Run 2-7/8" x 3-1/4" x 3-1/2" 13Cr liner to TD. 6. Pump primary cement job: 35.75 bbls, 15.3 ppg Class G, TOC at TOL (^'10,430 MD)*. 7. Perforate well with rig (`500'). 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. V: Valve & tree work 2. S: SBHPS, set LTP* (if necessary). Set live GLVs. 3. T: Portable test separator flowback. 4iro krcf- Operation Details: Mud Program: • • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (444 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion Fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, 13Cr solid liner: 11,236' MD —12,940' MD • 3-1/4", 6.6#, 13Cr solid liner: 10,715' MD —11,236' MD • 3-1/2", 9.3#, 13Cr solid liner: 10,430' MD -10,715' MD • A planned 35.75 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 10,430' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (440 psi over -balance) • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 102% inclination at kick off point is 38'. • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property — 9135' • Distance to nearest well within pool —510' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Perforating: • Perforating: —500' of perforations (on rig) - 2", 60 deg random phasing, 6 spf, perf guns. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • Drill Site 14 is considered an H2S pad. Maximum H2S reading on 14-21: 590 ppm (06/18/2002). Most recent H25 sample on 14-38: 18 ppm (10/12/1994) • Overall Lost circulation risk is considered medium. Reservoir Pressure: 0 • V-11 • The reservoir pressure on 14-38 is expected to be 3400 psi at 8800' TVDSS (7.43 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2520 psi. r Trevor Hyatt • CC: Well File CTD Engineer Joseph Lastufka 564-4627 TRREE= FMC GEJ 4 VYBLHFAD= FMC ACTUATOR= AXEFSON OKB. aEV = 74' BF. E LR(= 43.01' KOP= 4024' Max Angle = 50' @ 8700' Datum MD= 10582' Datum TVD= WW SS = 19.124' .%-TY NOTES: W AIVERED WELL. T X IA 14-38 �-JMMUNICARON. 101 113-3/8" CSG, 689, K-55, ID =12.415' 1-1 68' 72#, L-80, ID = 12.347 - Minimum ID = 3.725" @ 10454' 4-1/2" OTIS XN NIPPLE 7" LNR 3480' 9-5/8" CSG, 47#, L-80, D = 8.681- I1 10707' 1 PERFORATION SUMMARY REF LOG BRCS ON 10/2388 ANGLEAT TOPPER/: 42 @ 10608' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OpNSqz DATE 4" 4 10608 -10624 O 12/1988 3-3/8' 4 10646 - 10668 O 06/04/92 4- 4 10724 - 10727 O 12/1988 4" 4 10734-10742 O 12/19/88 4" 4 10744 - 10758 O 12/1988 4" 4 10762 - 10792 O 1211988 4' 4 10806 - 10810 O 12/1988 4' 4 10812-10828 O 12/1988 4" 4 10840 - 10848 O 12/1988 4' 4 10850- 10858 O 12MR118 wro ttora GAS LIFT MANDRELS COMMENTS ST MD ND I DEV I TYPE VLV LATCH PORT DATE 1 3176 3176 1 MC-FMHO DOME RK 16 05/13119 2 4213 4202 17 MC-FMHO DMY RK 0 08/06192 3 5122 4982 42 MC-FMH0 SO RK 20 05/13119 4 6062 5666 43 MC-FMHO RK 0 11102115 5 7054 6383 45 MC-FMHO DMY RK 0 11192115 6 7939 6997 46 MC-FMHO DMY RK 0 10119/93 7 8827 7592 48 MC-FMHO DMY RK 0 0606192 8 10031 8464 42 MC-FMHO 'DMY RK 0 02104/90 9 110137 8543 42 MC-FMHO RK 0 1 1121115 CHEMICAL MANDRELS STI MD TVDIDEVI TYPE VLV LATCH PORI DATE 10 10243 8622 42 MCFMHO RK 0 1121/15 —STA", #9 & 910= EXTENDED PACIDNG 10347' 9-50'X4-1/2"BAKER DB PKR 10454' H 4-12" OTIS XN NIR ID = 3.725" 10465' 412'fiAKER SFiEAROUT SUB 10465' 4-1/2' WLES, -m I 10447' EGAD TT LOGGED 06/04/92 DATE REV BY COMMENTS DATE REV BY COMMENTS 102688 ORIGINAL COMPLETION 07/12/16 JTG/JMD SET PXN PLUG (0708/16) 02105190 LAST WORKOVER 01/07/19 JUJMD PULL PLUG/SET PLUG W/FLLE 022601 SIS -MD FINAL 05/15/19 JMG/ IMD GLV C/O (05/13/19) 08/2801 RN/KAK CORRECTIONS 05/16/19 LLG/JMD (TILLED PXN P LU (05/14/19) 01/2003 BHC/TP CORREFT MN D AND 2175' NP 06/10/19 JNUJMD ADDED BF, COND, FIXED TBG E 11/25/15 SAVJMD GLV G/O & UPDATES (11/02/15) PRUDHOE BAY UNIT WELL: 14-38 PERMIT No: 9881030 AR No: 50-029-21862-00 SES 9, T10N, R14E, 5125' FEL & 137.18' FNL BP ExploraWn (Alaska) TRff= FMVIC-GEN 4 WflLLEAD= FTC ACTUATOR= AXELSON KB. R_EV = 74' BF. BFV = 4 KOP= 4024' Lim Angle = 50 Q 8700' Daum MD= 10587 Dst=TVD= sew SS 12.415- H 68' I 13-3/8" CSG, 72q, L-80, D=12.34T I Minimum ID = 3.725" @ 10454' 4-1/2" Otis XN Nip 14-38A ATOP OF 7• LNR i 10394' Topof3-1/2"13Crlher to 10,430' MD TO TO C tD TO L 52 bpf, D = 3.958' 10466- 3 -1/2"x 3-1/4"XO 10,715'M D SG. 47* L-80. 111=8691- 1-f-40 PEWORATION =5691- PEWORATION SUMMARY REF LOG: BRCS ON 10/23188 ANGLE AT TOP PERR 42@10608' Note: Refer to Production DB for historical perf data SIZE SPF I INTERVAL Opn/Sgz DATE 4• 4 10608- 10624 O 12119188 3-3/8" 4 10646 - 10668 O 06/04192 4" 4 10724 - 10727 O 12/19188 4• 4 10734 - 10742 O 12119188 4• 4 10744- 10758 0 12/19188 4- 4 10762-10792 0 12/19/88 4• 4 10806- 10810 O 12119!88 4' 4 10812- 10828 0 12119/88 4" 4 10840 - 10848 O 12/19188 4• 4 10850 - 10858 O 12/19188 TOW S 4-1/2"x 7"Dela at 10,731' MD O deg ROHS 11048' 11182' S TY NOTES: WAIVERED WELL. 2175' 1-14-12• AVA TRSV SSSV NP, D = GAS LFT MANOTIELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3176 3176 1 MGFMFIO 10447' T-2 3-1/4"x2-7/8"XO 2-7/8"13CriD kk 11,236'MD 2 4213 4202 17 W -RA -10 10775' T-2 BHC/TP CORRECT MN D AND 2175' NP 3 5122 4982 42 MGFMiO T-2 4 6062 5666 43 MGPMHD RK 7054 6383 45 MGFMiO T-2 6 7939 6997 46 MC -FLM RC 7 8827 7592 48 MGFLM RK 8 10031 8464 42 MGFNFIO RK 9110137185431 42 1 W-MIHO I I RK CHEIXAL MAFDR3-S ST MD ND DEV TYPE VLV LATCH PDRr MTE 10 10243 8622 42 lX-RVHOj I RK 10347' REV BY 9-5/8'X4.12" BAF�2 OB PKR 10454' 4-12" 0715 XN NP, D= 3.725" ORIGINAL COMPLETION W to 3.80" 02105/90 10465' LAST WORKOVER 4-12" BAKER SFEAROUT SUB 10466• —14-1/2" ALM. D=??? 10447' B_MD TT LOGGED 06/04/92 3-1/4"x2-7/8"XO 2-7/8"13CriD kk 11,236'MD 12,940'MD TD 3gueeze perf'S pre-r�. 2-7/8"Pup m ailcerJT TBD 10863' AVA LOT (2S X 1') (LOST 04/03/93) CORRECTIONS 10775' AVA LOT (LOST 10103/93) 1 11018' 1 DATE REV BY OONTVEN 5 DATE I REV BY I ODM*A84rS 1026/88 ORIGINAL COMPLETION 2//17 RJth jxxN PLUG SET 1227/96 02105/90 LAST WORKOVER 01110101 SISOAA OONVBiT®TOCANVAS 02!26101 SISND RNAL 0828101 RNIKAK CORRECTIONS 0120/03 BHC/TP CORRECT MN D AND 2175' NP I RK LATCH FROM STA## (LOST 08/02195) 1 PRUD IOE BAY LUT WELL' 14-38 PEFWT No: 1881030 ARM: 50-029-21862-00 ON, R14F 5125' FI38 137.18' PTL BP Exploration (Alaska) North America - ALASKA - BP PBU 14 14-38 PLAN 14-38A Plan: 14-38A WP04 BP Coil Tubing Report 28 May, 2019 BP by BP Coil Tubing Report Design: 14-38A W VU4 Project PBU, PBU, PRUDHOE System Datum: Mean Sea Level Map System: Alaska NAD27 State Plane Zones Using Well Reference Point Geo Datum: NA027' OGP-Usa AK (4267`15864] Using geodetic style factor Map Zone: NAD27' OGP-Usa AK / Alaska zone 4126734-1586, site 14, TR -10-14 Local Coordinate Reference: Well 14-38 Company. North Americe-ALASKA-BP ND Reference: Mean Sea Level Project: PBU MD Reference: KB @ 74.00usft (61 : 3810/4/1988 00:00) Site: 14 North Reference: True Well: 14-38 Survey Calculation Method: Minimum Curvature Wellbore: PLAN 14-38A Database: EDM R5K -Alaskaka PROD - ANCP1 Design: 14-38A W VU4 Project PBU, PBU, PRUDHOE System Datum: Mean Sea Level Map System: Alaska NAD27 State Plane Zones Using Well Reference Point Geo Datum: NA027' OGP-Usa AK (4267`15864] Using geodetic style factor Map Zone: NAD27' OGP-Usa AK / Alaska zone 4126734-1586, site 14, TR -10-14 Depth From (ND) +N/ -S (usft) Northing: Site Position: 0.00 EastFrom: Map Position Uncertainty: 0.00 usft Slot Radius: Slot Ra: Well 14-38, 14-38 Well Position -NI-S 0.00 usft Northing: +E/ -W 0.00 usft Easeng: 0.00 usft Wellhead Elevation: Position Uncertainty Wellbore PLAN 14-38A Magnetics Model Name Sample Date Declination BGGM2018 1011/2019 16.67 Desi n 14-38A WP04 9 Audit Notes: Version: Vertical Section'. Phase: PLAN Depth From (ND) +N/ -S (usft) (usft) -43.01 0.00 5,939,577.430 usft Latitude: 674,150480 usft Longitude: 0.000 in Grid Convergence: 5,937,910.530 usft Latitude: 674,878.910 usft Longitude: 43.01 usft Ground Level: Dip Angle Field Strength (nT) 80.88 57 403 Tie On Depth: 10.700.00 +E/ -W Direction (usft) (°) 0.00 228.81 70" 14'26 346 N 148'35'36+726 W 1.32 ° 70° 14'9.789 N 148° 35' 16.679 W 42.00 usft COMPASS 5000.1 Build 81D 528/2019 1:34:25PM Page 2 am North America - ALASKA - BP Company: Local Co-ordinate TVD Reference: MD Reference: Reference: Project: PBU 3810/4/1988 00:00) Site: 14 Well: 14-38 True Minimum Curvature EDM R5K Alaska PROD - ANCP1 Wellbore: PLAN 14-38A Description Design: 14-38A WP04 Survey Tool Program Date 5/28/2019 From To Gyrodata cont.casing Ms (usft) (usft) Survey (Wellbore) 100.00 10,700.00 GyroData Gyro (14-38) 10,700.00 12,940.79 14-38A WP04 (PLAN 14-38A) Planned Survey MD Inc Azi NIS (usft) -2,784.90 (usft) (°) (°) Fasting (usft) 671442141 10,700.00 37,71 245.20 TIP 10,736.00 37.66 245.15 KOP 10,756.00 39.23 243.73 End 9deg/100 -148.58 8,887.37 10,796.00 49.92 235.92 4 10,932.87 90.00 226.13 6 8,915.84 -2,873.73 10,974.30 102.00 222.87 8 11,744.30 102.00 202.01 7216.73 11,284.30 102.00 -3,854.70 8 871,292.541 30.00 11,370.51 90.00 221.06 9 11,540.51 80.00 24146 10 30.00 4,697.11 11,820.51 90.00 207.86 11 5,934,767.217 671,178.968 12,100.51 90.00 241.46 526/2019 1:34:25PM BP BP Coil Tubing Report Local Co-ordinate TVD Reference: MD Reference: Reference: Well 14-36 Mean Sea Level KB @ 74.00us1t (61 : 3810/4/1988 00:00) North Reference: Survey Calculation Method: Database: True Minimum Curvature EDM R5K Alaska PROD - ANCP1 Tool Name Description GYD-CT-CMS Gyrodata cont.casing Ms MWD MWD -Standard TVDSg (usft) 8,843.22 NIS (usft) -2,784.90 EIW (usft) -3.502.52 Northing (usft) 5,935,045.338 Fasting (usft) 671442141 DLeg (°/100usft) 0.00 V. Sec TFace (usft) (°) 4.46976 0.00 887771 -2784.14 -3,522.50 5,935,035.838 871,422.388 0.16 4,490.87 -148.58 8,887.37 -2,799.50 -3,533.77 5,935,030.073 671,417.301 9.00 4,502.85 -30.00 8,915.84 -2,873.73 -3,557.82 5,835,015.232 871,387.535 30.00 4,530.36 -30.00 8,961.89 -2,893.96 -3,854.70 5,834,932.780 871,292.541 30.00 4,656.10 -15.00 8,957.57 -2,923.29 -3683.54 5,934,902.797 871,284.398 30.00 4,697.11 -15.00 8,922.22 -3,062.86 -3,772.23 5,934,767.217 671,178.968 12.00 4,855.78 -87.81 8,897.27 -3,164.87 -3,829.64 5,934,657.908 671,123.947 12.00 4,966.16 8846 8,886.79 -3,248.89 -3,895.86 5,934,574.383 871,059.849 12.00 5,070.01 160.00 8,888.19 -3,352.71 -4,02775 5,934,465.532 870,930.252 72.00 5,238.96 90 .00 8,888.19 -3,549.04 -4,221.75 5,934,284.772 670,740.873 12.00 5,514.24 -90.00 8,888.19 -3,745.37 4,415.75 5,934,084.011 670,551.495 72.00 5,789.52 90.00 COMPASS 5000.1 Build 81D Page 3 by Company: North America - ALASKA - BP Project: PBU Local Co-ordinate Site: 14 Well 14-38 Well: 14-38 -3,502.52 Wellbore: PLAN 14-38A -2,794.14 Design: 14-38A WP04 KOP Planned Survey -3,533.71 MD Inc -2,813.73 (usft) (°) 4 12,380.51 89,72 13 -2,923.29 12,560.51 89.56 14 MD Reference: 12,580.92 76.00 15 8 12,940.79 76.00 TD at 12940.79 -3,352.71 Plan Annotations 10 Measured Vertical Depth Depth (usft) (usft) 10,700.00 8,843.22 10,736.00 8,871.71 10,756.00 8,887.37 10,796.00 8,915.84 10,932.87 8,961.89 10,974.30 8,957.57 11,144.30 8,922.22 11,264.30 8,897.27 11,370.51 8,886.19 11,540.51 8,886.19 11,820.51 8,888.19 12,100.51 8,886.19 12,380.51 8,886.88 12,560.51 8,888.02 12,680.92 8,903.13 12,940.79 8,966.00 BP BP Coil Tubing Report Local Coordinates -NIS +E/ -W Local Co-ordinate Reference: Well 14-38 -2,784.90 -3,502.52 TIP -2,794.14 -3,522.50 KOP -2,799.50 -3,533.71 TVD Reference: -2,813.73 Mean See Level 4 -2,893.96 -3,654.70 5 -2,923.29 -3,683.54 6 -3,062.86 MD Reference: 7 KB @ 74.00usft (61 : 38 101411988 00:00) 8 -3,246.89 -3,895.86 9 -3,352.71 -4,027.75 10 North Reference: -4,221.75 True -3,745.37 -4.415.75 12 -3,941.69 -4,609.74 13 -4,081.42 4,721.52 Survey Calculation Method: Minimum Curvature 15 -4,349.80 4,970.01 TD at 12940.79 Database: EDM R5K - Alaska PROD - ANCP1 A:I TVDSS Nis EM Northing Easting DLeg V. Sac TFace 1°) (usft) (usft) (waft) (usft) (usft) (°1100usft) (usft) (°) 207.86 8,886.88 -3941.69 -4,609.74 5,933863.254 670,362.115 12.00 6,064.80 -90.50 229.46 8,888.02 -4,081.42 -4,721.52 5,933,720.983 670,253.617 12.00 6,240.93 90.50 234.50 8,903.13 -4,154.86 -4.815.33 5,933,645.393 670,161.544 12.00 6,359.89 160.00 202.36 8,966.00 -0,349.80 -4,970.01 5,933,446.932 670,011.434 11.99 6,604.67 -93.99 Local Coordinates -NIS +E/ -W (usft) (usft) Comment -2,784.90 -3,502.52 TIP -2,794.14 -3,522.50 KOP -2,799.50 -3,533.71 End 9degll00 -2,813.73 -3,557.82 4 -2,893.96 -3,654.70 5 -2,923.29 -3,683.54 6 -3,062.86 -3,772.23 7 -3,164.87 -3,829.64 8 -3,246.89 -3,895.86 9 -3,352.71 -4,027.75 10 -3,549.04 -4,221.75 11 -3,745.37 -4.415.75 12 -3,941.69 -4,609.74 13 -4,081.42 4,721.52 14 -4,154.86 -4,815.33 15 -4,349.80 4,970.01 TD at 12940.79 5482019 1:34:25PM Page 4 COMPASS 5000.1 Build 81D by North America - ALASKA - BP PBU 14 14-38 PLAN 14-38A 14-38A WP04 Anticollision Summary Report 28 May, 2019 WE Company: North America - ALASKA - BP Project: PBU Reference Site: 14 Site Error: O.00usft Reference Well: 14-38 Well Error: 0.0Ousft Reference Wellbore PLAN 14-38A Reference Design: 14-38A WP04 BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-38 Mean Sea Level KB @ 74.00usft (61 : 38 10/4/1988 00:00) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-38A WP04 Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering omens Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,700.00 to 12,940.79usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1 490.98usft Error Surface: Elliptical Conic Survey Tool Program Date 5/28/2019 From To (usft) (usft) Survey(Wellbom) 100.00 10,700.00 GyroData Gyro (14-38) 10,700.00 12,940.79 14-38A WP04 (PLAN 14-38A) Summary Site Name Offset Well - Wellbore - Design 14 14-17 - 14-17 - 14-17 14-17 - 14-17A - 14-17A 14-17 - 14-17A - Plan k3 14-21 - 14-21 -14-21 14-21 -14-21A - 14-21A 14-21 -14-21A - 14-21A wP08 14-22 - 14-228 - 14-228 14-22 - 14-22B - 14-22B 14-38 - 14-38 - 14-38 14AO - 14AO - 14.40 14-40 - 14-40A- 14-40A 14AO - 14AOA- Plan #1 14A4 - 14A4 - 14-44 14A4 - 14<4A- 14-44A 14-44 - 1444ALl - 14-44ALl Plan 3 14A4-14A4APB1-14-44A wp08 14A4-14>4AP61-14-44APB1 14-44 - 14A4PB1 - 14-44PB1 X X-09 - X-09 - X-09 X-09 - X -09A - X -09A X-09 - X -09B - X-098 Tool Name Description GVD-CT-CMS Gymdata contcasing Ms MWD MWD - Standard Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 11,000.00 11.175.00 256.41 12,806.62 12,925.00 402.34 12,308.64 12,446.00 507.98 12, 925.00 12,475.00 1,255.95 Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 11.81 256.41 Pass-NOERRORS Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 282.27 221.90 Pass - Major Risk 214.83 293.09 Pass - Major Risk 230.17 1,026.43 Pass -Major Risk 57282019 12:42:36PM Page 2 of 3 COMPASS 5000.1 Build 61D RE. Company: North America - ALASKA - BP Project: PBU Reference Site: 14 Site Error: 0.00usft Reference Well: 14-38 Well Error: 0,00usft Reference Wellbore PLAN 14-38A Reference Design: 14-38A WPO4 BP Anticollision Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-38 Mean Sea Levet KB @ 74.00usft (61 : 38 10/4/1988 00:00) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to KB Q 74.00usft (61 : 38 10/4/1988 Coordinates are relative to: 14-38 Offset Depths are relative to Onset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150° V0.000 W ° Gntl Convergence at Surface is: 1.33' Ladder Plot } 1440,1440A,1440A V4 -EIj- 1440,1440A, Plan#1 V1 $ 14-40,14-40,14-40V1 $ 14-37,14-37,14-37V1 --F 14-06,14-06A, 14-06A V2 -A- 14-06,14-06,14-06 V4 —� 14-17,14-17A, Plan#3V4 $ 14-17,14-17A, 14-17AV2 Measured Depth (2500 usftln) -IF 1444,1444AL1, 1444AL1 Plan 3 VO -� 1444,14 44A,1444A V4 �— 14-04,14A4AP31,14A4APB1V17 $ 1444,1444APB1,1444Av MV11 $ 1444,14-04P81, 1444PB1 V6 $ X -09,X -09,X-09\/9 $ X-09,X-09A,X-09AV4 ♦- X-09,X-09B,X-09BV23 -d- 1421,14-21A,14-21AHpOBV26 —6— 14-39,14-39,14-39V1 $- Plan 14-05, Plan 1445,1445vpO5V0 $ 14-38,14-38,14-38V1 -� 14-22,14-22A, 14-22A V1 �f 14-22,14-22B, 14-22B VO -Ar 14-22,14-22B, 14-22B V0 } 14-22,14-22,14-22V1 5/28/2019 12: 42:35PM Page 3 of 3 COMPASS 5000,1 Build 81D WELL DETAILS'. 1436 WELLBOREfDETAILSr.PLAN 14 mgne cNorh 16bpREB P*MIN80NWTION Me WTrIIvNoM144;1 Ground Level: 42.00 Cool&nablNtl: t4d1143B,T.NoM MpnelKFeM Northing: 5937910.530 Parent14.38 Veniel(TVD): MealSeal 9lnv,Ih 14025enEasOng: 674878.910 10700.00 Seabn NSC W (000N,9.00G DPAn le. 90. LaBitude: 70°14'9789N MoaveSe Dwth,8B@7400SSA(61:361041198300A0) D.. 1011201 Longitude: 148° 35' 16.679 W Ceh8elbnI*#N: MnumOCmelSS MWaI:BGOMi01 C_ - SECTIONDETAOS ANNOTATIONS Sec MD Me An wTVD -W-S +FJ.W DIe9 TF= VSeotTalgel TVD MD Annols80n 1 1070090 37.71 245.20 OW22 -2784.90 350252 0.00 0.00 4469.76 8843.22 10700-0) TP 2 10736.00 37.56 245.15 8871.71 -2794.14 _1522,50 0.16 -14858 4490.87 8871.71 10736.00 SOP 3 10756.00 39.23 243.73 8887.37 -2799.50 -3533.71 9.00 -30.00 4502.85 8887.37 10756.00 EIId9d*100 4 10796.00 49.92 235.92 891581 -281373 -355792 30.00 .30.00 453036 891584 1079600 4 5 1093297 90.00 226.13 8961.89 .2693.96 -365470 3DW -15.00 4656.10 8961.89 10932,87 5 6 10974.30 Watt 22237 895757 -2923.29 .368354 30.00 .15.00 4697.11 895757 10974.30 6 T 11144.30 102.00 202.01 892222 -3062.86 -377223 12.00 -90.00 4855.78 892222 11144.30 7 8 11264.30 10200 216.73 8897.27 -316487 -3829.64 1200 90.00 4966.16 8897,27 11264.30 8 9 11370.51 90.00 221.06 8886.19 -324689 3895.86 1200. 160.00 5070.01 8886.19 11370.51 9 10 11540.51 90.07 241.46 8886,19 .3352.71 4027.75 12.00 9000 5238.96 888619 11540.51 10 11 11820.51 90.00 207,86 888619 -3549.04 4221.75 12.00 -90.00 5514.24 8806.19 11820.51 11 12 12100.51 90.00 241.46 8986.19 -3745.37 5415.75 12.00 90.00 5789.52 WAS 12100.51 12 13 12380.51 89,72 20796 888698 .3941.69 4603.74 12.00 -90.50 606480 8886.88 12380.51 13 14 12560.51 89.56 229.46 8888.02 -4001.42 472152 12.07 90.50 624093 888802 12560.51 14 15 7268092 76.00 134.07 8907.13 4154.86 4875.33 1200 160.00 635999 8903.13 12680.92 15 16 12907.79 Hall 202% 8966.00 4349.80 4970.01 12.00 .90.00 660467 896fi00 12440.79 TO 12940.79 C_ West( -)/East(+) (200 usft/in) 35 - B]20 ■■■■��',.�.!��■■ 111, 970 4 ,,•����■�®���,I-��■■■ III' 8800 TP aw :1 �■■►r■.r.�.�■■a■■i�■■■■ 4-38P TI 1438A r ■��■■!®■a ■■■t1■■■FIR■ BAD T'P OWS 88 IN, K P 89 -9 10 11 2 1 14 1 1438 T4 8 West( -)/East(+) (200 usft/in) 35 - B]20 970 8800 TP aw 4-38P TI 1438A 1438AT BAD T'P OWS 88 IN, K P 89 -9 10 11 2 1 14 1 1438 T4 8 IS 311 "X2] " 896 m 12940 T I 39A PO4 901 908 912 - 8 M n Se evel awn SIM SIM 52011 5100 5400 5500 5600 5700 5800 5900 6000 6100 6200 6300 0700 6500 6600 6700 6800 6900 7000 7100 ]200 7400 7400 7500 7600 ]]W Vertical Section at 228.810 (100 usft/in) Ladder Plot Measurea Uepm (iuu u$rum) m.+sMumaw �—umal1.a IVVV>la axgzlB,%pN Tavle vw �uR wffi.. a¢.ta6w fan. 1. as wII u.'oe—. w4+am.�mnw a��laa�imn %A.xmd FinavvY —ia4 cam dam.". 'aR 14.R v1 1.Ia waw -'—WJ ��am uW Daman —uuw–ww— 1RA 14-11 From Colour To MD 10700 10900 10900 11000 MN COWSION SMINGS COMPANY DETAII-S: Norte Ammka-M W- SP Project: POU 12850 12850 $Ne: 14 otNrpolBOon MObod: MD.NNna1.29.00 Calculation Med,ne: Min orro CurVaMre WBN: 14+75 Mplit Range From: 10700M11012940]9 ERor Splem: IMMA Welbw PUN 144511 Results l -looked By'. Centre Distance' 149095 Reference: PM¢14-30A%W14(14-MMIAN 144tMj San Method: Tray. Cylinder NOM Error Surface: ElliputalConic Dest$D: 1448AWP04 Warning Method: Rules Based Ladder Plot Measurea Uepm (iuu u$rum) m.+sMumaw �—umal1.a IVVV>la axgzlB,%pN Tavle vw �uR wffi.. a¢.ta6w fan. 1. as wII u.'oe—. w4+am.�mnw a��laa�imn %A.xmd FinavvY —ia4 cam dam.". 'aR 14.R v1 1.Ia waw -'—WJ ��am uW Daman —uuw–ww— 1RA 14-11 From Colour To MD 10700 10900 10900 11000 11000 12750 12750 12850 12850 12941 SURV PRWIVkM NOMNrerioo-ALASIU-9P Depth From Depot To SUIveyRlen Tool 100.00 107MOD GywDaN.Gyro(1449) GYD-CT-CMS 10700.00 12940.79 143aA %AP04 (PLAN 14441 MM NE oa+a.v1.,n v, +aW wN +u] V+ P1gsel: PBU SXe: 14 WELL DETAILS: ANTFCOLLISIDN SETTINGS Grouna Level: 42.00 1 parpN 140]0000 Well: 14-38 NmhBng: 5937910.530 Range Fram: To 12940.78 Reaulb Limned By: Centre D6tan®: 1490.88 Wellb4ve: PLAN1448A Easting: 674878,910 Referenm: 14-38A W1M4 Plan: 1438AWP04 Lallitude 70* 12850- - -12941 Lonailude: 14814'9789960 - Depth Range: 10700.00 To 12940.79 From Colour TO MD 120 10700- 10900 10900-11000 110 & j 11000-12750 MD 100 "30 12750 12850 Dlq 12850- - -12941 7 COMPANY DETAILS: NoMAme+in-ALASIU-BP Cakulatkn Mca+od', hoMimumc olog Error Sr%m: ISCWSA scan MNace: TreerNOM Error Surface: EllicalCMk W4mm9 MNadl'. Rubs MS WB8Kd5ed 1BO Azenuthfrom Nodhllw Cerme W Cenee Sepera8on [10 usRfmI Sec MD +A. v a22e +anew 1W .N2 -s .V.W Dlq TFau Ysck .a 0)00.00 1171 w.a+ee.xmva aa. o... aa+a«.mmw 804332 -'Y784.go -3502.53 0.00 .2..row +ax +az v+ +av411sa. 3733 24515 W7 53].)1 016 COMPANY DETAILS: NoMAme+in-ALASIU-BP Cakulatkn Mca+od', hoMimumc olog Error Sr%m: ISCWSA scan MNace: TreerNOM Error Surface: EllicalCMk W4mm9 MNadl'. Rubs MS WB8Kd5ed SLRVEYPROGRM4 DeMOFmm Oe Tc Burvey4Mm Tool 10000 10700M Gy+oDM Gyro( W GYMS 10]00.00 1240.79 ITMAWP04(P 1446.41 MWD Depth Range:,10700.00 To 12940.79 Azim W 0 from N dM I•I vs Cemre m Lenue sem m8on 10 ue50n1 14-M SE0110NDETAIL9 Sec MD Inc Aa 1W .N2 -s .V.W Dlq TFau Ysck 1 0)00.00 1171 3].]1 245.20 804332 -'Y784.go -3502.53 0.00 0.00 4459.76 00 3733 24515 W7 53].)1 016 -148,58 44N,87 3 10]58.00 39I'M 243.)3 M87 37 ])99.60 -354794.14 9.00 4DW 450205 4 10798.0 49.M 235.92 0915.04 -2813.73 -3557.82 300 -30.00 453036 5 10032.87 9000 2ffi_13 0%1.89 -209398 3654.]0 3000 -1500 406,10 6 1097430 103.00 22287 W575] -292329 -358354 W.W -15.W 469),11 11144.30 102.00 202.01 892222 3062.88 -37823 120 4000 4855.78 a fl3N.3D 10200 216.73 5077 -3184,8) -382.64 12.00 90.00 4986.16 9 11370.51 90.0 2106 0886.19 NOW -389558 12.0 160005010,01 10 11540.51 60.0 241.48 0896.19 -335271 402775 1200 W.W 528.W 11 1102.51 W.0 27.89 8886.19 -3548.04 421 ]5 1200 4000 551424 12 12100,51 90W N1.46 OON19 -37453) 4415)5 12.0 90.00 5709.52 13 12360,51 09.72 2DTW 8998.9a 494169 /509.74 120 90M 6064.90 14 12560.51 0 W 22.46 8898.02 4081.42 472152 1200 W.50 e]4D.W 15 1260.92 MOO 234.W BW3.13 AIKW +1815.3343 1200 160.06359.89 16 12940]0 M.OD 22.36 6066.60-U49 497001 1200 40,00 604.6) SLRVEYPROGRM4 DeMOFmm Oe Tc Burvey4Mm Tool 10000 10700M Gy+oDM Gyro( W GYMS 10]00.00 1240.79 ITMAWP04(P 1446.41 MWD Depth Range:,10700.00 To 12940.79 Azim W 0 from N dM I•I vs Cemre m Lenue sem m8on 10 ue50n1 14-M RE P, : Psll f}1, ipm,n.niN.mn WELLBORE DETAILS: PUN 1439A REfE1ENCENrORIMipry rnp+�cremie sell: 10 She coamnw(we)RYmnm'. WY 16]e, iwexaa wac u3e �"`°": �`� vYo®ilrv%Rpmrm: Ns.ii 6ea Le,Y wain.,: PLAN u78A .WY.-rom fieWt%(VP6)R.iererm'. voi-ro66x.66oE) Peleik Welle.re: 1438 Dea n: 1a3eAWPUPIYBeWNMD B yllffi/Jp us� MewMOePI Rpm,. NB@71WUA161'. J01WM3M,AW wm'.em®i T,on MD: 10700.00 cpy wWM A..-GmeLn AOGCC Spider Plot - Offsets within 200ft Eeseng (100 us Win) North America - ALASKA - BID PBU 14 14-38 PLAN 14-38A 14-38A WP04 Plus 500ft MD AOGCC Offset Well Report 28 May, 2019 by Company: North America -ALASKA - BP Project: PBU Reference Site: 14 Site Error: 0.00usft Reference Well: 14-38 Well Error: 0 0ousft Reference Wellbore PLAN 14-38A Elliptical Conic e_¢an VJPnd Plus500k MD BP Anticollisicn Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: output errors are at Database: Offset TVD Reference: Well 14-38 Mean Sea Level KB (gD 74.00usft (61 :38 10/4/1988 00:00) True Minimum Curvature 1 00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference 14-38A WP04 Plus 5008 MO Fitter type; NO GLOBAL FILTER: Using user defined selection 8 tittering criteria Reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Tray. Cylinder North Depth Range: Unlimited Scan Method: Centre Results Limited by: Maximum center-eenter distance of 200 00usft Error Surface: Elliptical Conic Survey Tool Program Date 512 812 01 9 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,700.00 GyroData Gyro (14-38) GVD-CT-CMS Gyrodata cont.casing Ms 10,700.00 13,4407914-38AWP04 Plus 5001 MD (PLAN 14-38 MWD MWD -Standard 528/2019 1:51:45PM Page 2 of 2 COMPASS 5000.1 Build 81D Reference Offset Centre to Measured Measured Centre r14 Depth Depth Distance (usft) (usft) (usft) llbore - Design 2,603.12 2,600.00 7324 4-1714-17A 2,803.12 2,800.00 73.24 2,603.12 2,600.00 73.24 14-17 - 14-17A- Plan #3 1,853.25 1,850.00 190.19 1422 - 1422 - 14-22 1,853.25 1,850.00 190.19 14-22 - 14-22A- 14-22A 32.22 32.22 180.10 14-22 - 14-22B - 14-22B 1,842.35 1,850.00 190.04 14-22 - 14228 - 14-22B 3,471.66 3,475.00 53.69 14-37 - 14-37 - 14-37 12,925.00 12,925.00 0.00 1438 - PLAN 14-38A- 14-38A WP04 2,000.09 2,000.00 122.40 14-39 - 1439 - 1439 877.20 875.00 14.35 14-44 - 14-44 - 1444 879.16 875.00 14.37 14-44 -14-44A- 1444A 879.16 875.00 14.37 1444 - 1444ALl - 1444ALl Plan 3 879.16 875.00 14.37 1444 - 14-44APB1 - 1444A wp08 879.18 875.00 14.37 14-44 - 1444APB1 - 1444APB1 877.20 875.00 14.35 1444 - 1444PBI - 14-44P81 X 528/2019 1:51:45PM Page 2 of 2 COMPASS 5000.1 Build 81D Well Bighole Quick Test Sub to Otis Top of 7" Otis Distances from top of riser Excluding quick -test sub Top of Annular CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 ----------------- i ... --- Top of Annular Element 6.7 tt Bottom Annular 8.0 ft CL Blind/Shears CL 2-3/8" Pipe/Slips 10.1 tt a1 B2 Kill Line CL 2-3/8" x 3-1/2" VBRs 12.6 h CL 2-3/8" Pipe/Slips 13.4 k dril 7 Ill Annular Rig's Drip Pan 7-1116" Sk Flange X T' Otis Box CL of Top Swab 16.0 ft �-- Swab . T1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS O IA Ground Level T2 Choke Line Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: rB ck- I1 J D A PTD: :3s I I — O 8�6 _�/ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: PrajhogPOOL: Pr U� ft 0 Pd n I I Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50--______. be a function of the original (If last two digits Production should continue to reported as in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by logs (Company Name) in the attached application, the following well are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT 14-3$A.Program DEV ._ Well bore seg ❑ PTD#: 2190880 Company BP EXPLORATION (ALASKA) INC _ Initial Class/Type DEV / PENp_ _GeoArea 890 _. _ Unit 1t5-0—. On/Off Shore On. Annular Disposal —I Administration 1 Permit fee attached _ _ _ NA Commissioner: D� Date: 12 Lease number appropriate.. _ _ _ _ _ _ _ .. Yes _ f40 3 Unique well name and number _ _ _ No 14 _ _ _ Well located in a. defined pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 5 Well located proper distance from drilling unit boundary _ _ Yes 6 Well located proper distance from other wells. _ Yes 7 Sufficient acreage_ available in drilling unit.. _ _ _ _ Yes 8 If deviated, is wellbore plat included _ _ _ _ _ _ Yes Directional plan view and wellbore prifile included. 9 Operator only affected party _ _ _ Yes 10 Operator has.approprate bond in force _ _ _ Yes 11 Permit can be issued without conservation order. _ _ _ _ _ _ Yes _ Appr Date 12 Permit can be issued without administrative approval _ _ _ _ .. _ _ Yes _ DLB 6/11/2019 13 Can permit be approved before 15 -day wait.. ... _ _ _ Yes 14 Well located within area and.strata authorized by. Injection Order# (pot. 0# in. comments), (For NA 15 All wells within 114. mile area_of review identified (For service well only) . _ NA 16 Pre -produced injector duration. of pre -production less than.3 months. (For service well only) NA.. 17 Nonconven, gas conforms to AS31,05.030Q.1. A),Q.2.A-D) _ _ _ _ _ _ _ NA_ 18 Conductor string_ provided ....... NA _ . _ CTD sidetrack, all drilling will be within the reservoir Engineering 19 Surface casing protects all. known USDWs . . ..... . . . . . ....... . . . .... NA _ _ CTD sidetrack, all drilling will be within the reservoir 20 CMT vol adequate to circulate on conductor. & surf csg _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ CTD sidetrack, all drilling will be within the reservoir 21 CMT vol adequate to tie-in long string to surf csg ...... _ _ _ NA.... CTD sidetrack, all drilling will be within the reservoir 22 CMT will cover all known productive horizons. _ _ _ _ _ _ _ _ Yes _ _ _ _ Fully cemented production liner 23 Casing designs adequate for C, T, B & permafrost _ _ Yes _ 24 Adequate tankage or reserve pit _ .. _ _ Yes CDR2 is ongoing operation,.good truck support _ 25 If a. re -drill, has. a 10-403 for abandonment been approved _ _ _ _ _ _ Yes Sundry 319-290 is approved, Variance to 20AAC25,112(i) approved. 26 Adequate wellbore separation proposed_ _ ... _ _ Yes Planned wellpath passes all BP separation criteria for major risk 127 If,diverter required, does it meet regulations. _ NA CTD sidetrack, all drilling will be within the reservoir Appr Date 28 Drilling Fluid program schematic & equip, list. adequate.... Yes All fluids are overbalance to reservoirpressure MGR 6/13/2019 29 BOPEs, do they meet regulation _ _ _ _ _ _ _ Yes _ 4 ram, 1 annular stack. for CTD drilling _* ... 30 BOPEpress rating appropriate; lest to (put psig in comments). Yes _ 5M BOPE stack, tested to 3500 psi,.MASP 2520 psi 31 Choke. manifold complies w/API RP -53 (May 84)... _ _ _ _ Yes 32 Work will occur without operation shutdown _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ CDR2 is ongoing operations 33 Is presence. of H2S gas probable. _ _ _ ..... .. _ _ _ Yes _ DS14. is an H2S pad, Standard SP monitoring equipment/procedures will be implemented 34 Mechanical.condition of wells within AOR verified (For service well only) . . ...... . . . . . NA_ _ _ _ _ _ _ _ This well is a development well 35 Permit. can be issued w/o hydrogen sulfide measures...... _ _ _ _ No _ _ DS 14 wells are_H2S-bearing. H2S measures are required. Geology 36 Data, presented on potential overpressure zones. _ _ . .... _ Yes Appr Date 37 Seismic. analysis of shallow gas. zones.. DLB 6/11/2019 38 Seabed condition survey (if off -shore) _ _ _ _ _ _ ... _ _ NA 39 Contact name/phone for weekly_ progress reports [exploratory only] _ . _ _ NA Geologic Engineering Public Commissioner: D� Date: Commissioner: Date Commissioner Date f40 v