Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
219-100
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-22187-01-00Well Name/No. PRUDHOE BAY UNIT F-48ACompletion Status1-OILCompletion Date7/21/2019Permit to Drill2191000Operator Hilcorp North Slope, LLCMD13000TVD8866Current Status1-OIL6/28/2021UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:MWD / GR / ResNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC10/21/201912236 13000 Electronic Data Set, Filename: F-48A_LWD_FINAL_FIELD_COMPOSITE_20JUL2019_BHI_CTK.las31337EDDigital DataC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_MD_FINAL_FIELD_BHI_CTK.cgm31337EDDigital DataC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.cgm31337EDDigital DataC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_MD_FINAL_FIELD_BHI_CTK.pdf31337EDDigital DataC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.pdf31337EDDigital DataC10/21/2019 Electronic File: F-48A Final Field Svys.csv31337EDDigital DataC10/21/2019 Electronic File: F-48A Final Field Svys.xlsx31337EDDigital DataC10/21/2019 Electronic File: F-48A Final Surveys.pdf31337EDDigital DataC10/21/2019 Electronic File: F-48A Final Surveys.txt31337EDDigital DataC10/21/2019 Electronic File: F-48A_25_tapescan_BHI_CTK.txt31337EDDigital DataC10/21/2019 Electronic File: F-48A_5_tapescan_BHI_CTK.txt31337EDDigital DataC10/21/2019 Electronic File: F-48A_output.tap31337EDDigital DataC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_MD_FINAL_FIELD_BHI_CTK.tif31337EDDigital DataMonday, June 28, 2021AOGCCPage 1 of 3F-,48A_LWD_FINAL_FIELD_COMPOSITE_20JUL2__ _019_BHI_CTK.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-22187-01-00Well Name/No. PRUDHOE BAY UNIT F-48ACompletion Status1-OILCompletion Date7/21/2019Permit to Drill2191000Operator Hilcorp North Slope, LLCMD13000TVD8866Current Status1-OIL6/28/2021UICNoC10/21/2019 Electronic File: F-48A_GR_Res_20JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.tif31337EDDigital Data0 0 2191000 PRUDHOE BAY UNIT F-48A LOG HEADERS31337LogLog Header Scans0 0 2191000 PRUDHOE BAY UNIT F-48A PB1 LOG HEADERS31338LogLog Header ScansC10/21/201912381 12970 Electronic Data Set, Filename: F-48APB1_LWD_FINAL_FIELD_COMPOSITE_04JUL2019_BHI_CTK.las31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_MD_FINAL_FIELD_BHI_CTK.cgm31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.cgm31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_MD_FINAL_FIELD_BHI_CTK.pdf31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.pdf31338EDDigital DataC10/21/2019 Electronic File: F-48APB1 Final Surveys.csv31338EDDigital DataC10/21/2019 Electronic File: F-48APB1 Final Surveys.pdf31338EDDigital DataC10/21/2019 Electronic File: F-48APB1 Final Surveys.txt31338EDDigital DataC10/21/2019 Electronic File: F-48APB1 Final Surveys.xlsx31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_25_tapescan_BHI_CTK.txt31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_5_tapescan_BHI_CTK.txt31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_output.tap31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_MD_FINAL_FIELD_BHI_CTK.tif31338EDDigital DataC10/21/2019 Electronic File: F-48APB1_GR_Res_04JUL2019_TVDSS_FINAL_FIELD_BHI_CTK.tif31338EDDigital DataMonday, June 28, 2021AOGCCPage 2 of 3: F-,48APB1_LWD_FINAL_FIELD_COMPOSITE_04J__ _UL2019_BHI_CTK.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-22187-01-00Well Name/No. PRUDHOE BAY UNIT F-48ACompletion Status1-OILCompletion Date7/21/2019Permit to Drill2191000Operator Hilcorp North Slope, LLCMD13000TVD8866Current Status1-OIL6/28/2021UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:7/21/2019Release Date:7/17/2019Monday, June 28, 2021AOGCCPage 3 of 3M.Guhl 6/28/2021 PBU F‐48L1 (PTD 219‐068), PBU F‐48L1‐01 (PTD 219‐069), PBU F‐48A (PTD 219‐100) and PBU F‐48AL1 (PTD 219‐101) Note to File Well Names, Permit to Drill Numbers, and API Numbers Summary In April 2019, BP submitted Permit to Drill applications for two proposed well branches—PBU F‐48L1 and PBU F‐48L1‐01—to be drilled from the primary well PBU F‐48. BP’s intent was to drill L1 to a depth of 15,074’ MD, set a whipstock, and then drill L1‐01. In May 2019, AOGCC approved these applications. On July 2, 2019, BP spud the F‐48L1 well branch and drilled to 12,970’ MD. Subsequent problems with the casing window, wellbore instability, lost‐then‐recovered pipe, and down‐hole bridges resulted loss of this section of hole. A second whipstock was set and cemented at 12,465’ MD, isolating primary well F‐48. This isolation required the name of new planned borehole be changed from F‐48L1 to F‐48A and the name of the second planned well branch to be changed from F‐48L1‐01 to F‐48AL1. To minimize confusion from this name change, AOGCC requested BP submit two new Permit to Drill applications for F‐48A and F‐48AL1. These applications were approved by AOGCC on July 17, 2021. For clarity of record, all drilling operations previously conducted under F‐48L1 (beginning with the lost section of wellbore that was spud July 2, 2019) were reassigned to F‐48A. The lost section of hole drilled to 12,970’ MD is now named F‐48A PB1. On July 17,2021, the F‐48A wellbore was spud and drilled to a total depth of 13,000’ MD. Problems were again encountered, and the well was placed in operations shutdown status. On July 17, 2020, AOGCC extended this status through July 30, 2021. On May 14, 2021, AOGCC granted Hilcorp’s (BP’s successor as operator) request to end operations shutdown and place the well on production. Details In April 2019, BP submitted Permit to Drill applications for two proposed well branches to be drilled from the primary well PBU F‐48. In May 2019, AOGCC issued two Permits to Drill for PBU F‐48A L1 (PTD 219‐ 068, API 50‐029‐22187‐60‐00) and PBU F‐48A L1‐01 (PTD 219‐069, API 50‐029‐22187‐61‐00). BP’s intent was to drill L1 to a depth of 15,074’ MD, set a whipstock, and then drill L1‐01. On July 1, 2019, BP set a whipstock at 12,496’ MD and milled a window through the casing string. On July 2, 2019, BP began drilling the L1 well branch, reaching a total depth of 12,970’ MD that same day. Following a wiper trip into casing, the drilling bit and string encountered problems while attempting to pass downward through the casing window. After further milling (dressing) of the window, the operator was unable to get the drill bit below 12,900’ MD. Following a wiper trip, the drill string was eased down from 12,890’ and reamed back to bottom. After 5 feet of drilling, it appeared as new hole was being drilled. Two subsequent wiper trips were made to the casing window, then the hole began packing off at about 12,350’ MD. The operator was able to move pipe to 12,460’ MD, then during the evening of July 4th the pipe became stuck. On July 7th, the operator rigged up to recover the stuck pipe. On July 9th, the coiled tubing drill string was cut at 12,233’ MD. On July 11th, a new reel of coiled tubing was installed, a milling BHA was run in hole, and the top of the lost tubing was dressed. A fishing assembly was rigged up on July 12th, the operator latched onto the fish and began jarring. On July 13, the lost drill string was recovered. The hole was cleaned out to 12,455’ MD where a hard bridge was encountered. Unsuccessful attempts were made to ram through the bridge, then the hole was cleaned out to 12,498’ MD. On July 15th, a second whipstock was set and cemented at 12,465’ MD. Because of drilling problems, BP’s proposed operations were changed, requiring either revised or new Permit to Drill applications for AOGCC approval. For clarity of record, at AOGCC’s request on July 15th BP submitted two new Permit to drill applications: the wellbore formerly known as F‐48L1 was renamed F‐ 48A because the second whipstock at 12,465’ MD was cemented, which eliminated communication with the primary wellbore F‐48. To minimize confusion, the Permits to Drill for F‐48L1 (PTD 219‐068, API 50‐029‐22187‐60‐00) and PBU F‐ 48 L1‐01 (PTD 219‐069, API 50‐029‐22187‐61‐00) were cancelled, and two new applications were submitted for F‐48A (PTD 219‐100, API 50‐029‐22187‐01‐00) and F‐48AL1 (PTD 219‐101, API 50‐029‐ 22187‐62). All operations previously conducted in the wellbore formerly known as F‐48L1 were reassigned to F‐48A (PTD 219‐100). Because the section of wellbore drilled to 12,790’ MD was lost, this lost section is now labeled F‐48A PB1, and all information from that lost section are recorded under Permit to Drill number 219‐100 and labeled with the API Number of 50‐029‐22187‐70‐00. On July 17th, the F‐48A wellbore was spud and drilled to a total depth of 13,000’ MD. Problems were again encountered at the window and with bridges in the wellbore. On July 21, 2019 operations ceased in F‐48A and the well was placed in operations shutdown status. On July 17, 2020, AOGCC extended the operations shutdown status through July 30, 2021. On May 14, 2021, AOGCC granted Hilcorp’s (BP’s successor as operator) request to end operations shutdown and place the well on production. S. Davies May 21, 2021 Operator Name:2. Exploratory Development Service 5 Permit to Drill Number:219-100 6.API Number:50-029-22187-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 0028277, 0028280, 0028278 Property Designation (Lease Number):10. 341H 8. PBU F-48A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown POP Well, End Ops SD Op Shutdown GAS GSTOR WAG SPLUG Abandoned Oil 5 WINJ Exploratory Development 5Stratigraphic Service WDSPL 12. Attachments: PRESENT WELL CONDITION SUMMARY 13000 Effective Depth MD: 13cr80 11. 5/10/2021 Commission Representative: 15. Suspended Contact Name: Noel Nocas Contact Email: Noel.Nocas@hilcorp.com Authorized Name: Stan Golis Authorized Title:Sr. Area Operations Manager Authorized Signature: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Yes No Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: 4-1/2" TIW HBBP Packer Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8866 Effective Depth TVD:Plugs (MD):Junk (MD): Other Stimulate Re-enter Susp Well Suspend Plug for Redrill Perforate Perforate New Pool 12065, 8568 12710, 8639 Date: Liner 275 7" 12195 - 12470 8655 - 8842 7240 5410 Well Status after proposed work: 16. Verbal Approval: Change Approved Program 31 - 2755 31 - 2679 14. Estimated Date for Commencing Operations: BOP Sketch 32 - 112 Structural 6870 / 5750 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S3 Packer 12470 - 13000 8842 - 8866 4-1/2" 12.6#27 - 12257 Production 13000 8866 None None 32 - 112 13-3/8" 9-5/8" Contact Phone:907.564.5278 Date: 4760 / 3090 80 20"Conductor 2260 GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2724 5020 Intermediate 12432 29 - 12461 29 - 8836 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. 2323 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.05.03 13:43:23 -08'00' Stan Golis (880) By Meredith Guhl at 12:05 pm, May 04, 2021 321-227 DLB05/04/2021 DSR-5/5/21 X MGR14MAY21 dts 5/14/2021 JLC 5/14/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.05.14 12:23:08 -08'00' RBDMS HEW 5/17/2021 WELL: F-48A PTD:219-100 Well Name:F-48A API Number:50-029-22187-01 Current Status:Operations Shut Down Estimated Start Date:5/10/2021 Permit to Drill Number:219-100 First Call Engineer:Noel Nocas 907-564-5278 (O)907-229-9532 M Max. Anticipated Surface Pressure:2,323 psi (Based on 0.1 psi/ft. gas gradient) Min ID:3.805” ID Milled Parker SWN Nipple @ 12,245’ MD Max Angle:57 Deg @ 4628’ Brief Well Summary: The F-48 was planned to be a dual-lateral sidetrack in the Sag River Formation. During drilling in July 2019, the well experienced instability in the Shublik and after clean-up attempts, had difficulty exiting the window and ultimately decided to set another whipstock and try again. The next whipstock was cemented in place, shutting off the parent wellbore (making it F-48A officially). The new sidetrack planned to not drill as deeply into the Shublik with hopes to avoid the instability zone. The well successfully drilled the sump and re-entered the Sag and drilled ~200’ in the Sag before tripping for a lateral BHA. While tripping, instability in Shublik was again encountered and they had issues once more at the window while trying to clean it up. After all the issues trying to get through the window and Shublik instability, the team decided to rig down. It is believed that the previous frac job that was done on this well (both Ivishak and Sag frac’d in 1992) and the azimuth the well drilled through the Shublik is why it was more unstable than usual. Ultimately, there is 80’ of Sag open in the heel and 200’ open on the other side of the Shublik sump that may or may not be able to contribute (not sure if Shublik has caved in or not). The Sag in this area is of high quality and even if only the 80’ of heel footage is open, it has a chance of flowing on its own. There are several OH completions in this area, none of which have issues with solids production. It is unlikely that the Shublik will produce solids, given the fact that coiled tubing drilling wasn’t circulating them out, so it is unlikely they will flow to surface during producing conditions, plus the Shublik has probably collapsed by now. Objective: After considering options with the Operations Shutdown well F-48A, Hilcorp North Slope requests to change well status from Operations Shutdown to Development and attempt to produce from the open hole section that was drilled by CTD in 2019. An AOGCC Form 10-407 Report of Completion will also be filed. Attachments: 1. Wellbore Schematic 1a. Well Status: GINJ Oil 1b. Well Class: Exploratory Service Hilcorp North Slope, LLC 14. Permit to Drill Number/Sundry 219-100 7/2/2019 7/18/2019 GL PRUDHOE BAY, PRUDHOE OIL 4a. Surface: Top of Productive Interval: Total Depth: 362' FSL, 2863' FEL, Sec 02, T11, R13E, UM 3538' FSL, 3197' FEL, Sec. 34, T12N, R13E, UM 3828' FSL, 3011' FEL, Sec. 34, T12N, R13E, UM Surface: x- y- Zone -651959 5974883 ASP4 11. Gas SPLUG Abandoned 20AAC 25.105 Suspended 20AAC 25.110 WINJ WAG WDSPL No. of Completions: 7/21/2019 15. 50-029-22187-01-00 16. PBU F-48A Well Name and Number: 13000' / 8866' 35.73 17. TPI:y- Zone -646229 ASP4x-5980225 Total Depth: x-y-Zone -646409 ASP45980518 13000' / 8866' None DNR Approval Number:19. 87-035 5. Directional or Inclination Survey:Yes No Submit electronic and printed information per 20 AAC 25.050 (ft MSL) 20.Thickness of Permafrost MD/TVD: MWD / GR / Res CASING WT. PER FT.GRADE SETTING DEPTH MD TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED Location of Well (Governmental Section): Field/Pool(s): Date Comp., Susp., or Aband.:6. Total Depth (MD/TVD): CASING, LINER AND CEMENTING RECORD TOP BOTTOM 22. SETTING DEPTH TVD 9-5/8" 7" Conduct 68# 47# 26# NT-80 NT-80S 13CR80 32' 29' 12195' 12461' 12470' 32' 29' 8655'8842' 8836' 8-1/2" 12-/1/4"2760 cu ft Class 'G' 296 cu ft Class 'G' 25. GRADE PACKER SET (MD/TVD) 26. 4-1/2" 12.6# 13Cr80 27 - 12257' 12170' / 8639' DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED PRODUCTION TEST27. Date First Production: N/A N/A Date of Test: Flow Tubing Press Oil-Bbl: Oil-Bbl: Gas-MCF:Water-Bbl: Oil Gravity - API (corr): Method of Operation (Flowing, gas lift, etc.): Gas-Oil Ratio:Choke Size: Water-Bbl: Open to production or injection?Yes No24. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 12470' - 13000' 112'20" 13-3/8"31'2755'17-1/2"3790 cu ft Arctic Set II31'2679' 12071'/ 8572' Gas-MCF: Production for Test Period Calculated 24 Hour Rate Hours Tested: Casing Press: 112' ACID, FRACTURE, CEMENT SQUEEZE, ETC. TUBING RECORD DEPTH SET (MD) Yes NoWas hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed information ADL 028277 320-270 Other 12. SSSV Depth (MD/TVD): 4-1/2" Open Hole 07/18/2019 Ref Elevations BF 35.71 (attached) KB Form 10-407 Revised 3/2020 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Development Stratigraphic Test 2.Operator Name: 3. Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7. Date Spudded: 8. Date TD Reached: 9. 10. Plug Back Depth(MD/TVD): 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 64.83 Water Depth, if Offshore:13. N/A 1 API Number: Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 23. 18.Property Designation: 21.Re-drill/Lateral Top Window MD/TVD: 12470 / 8842 1910 / 1907 Submit within 30 days of Completion, Suspension, or Abandonment By Meredith Guhl at 3:21 pm, May 04, 2021 +(: RBDMS HEW 5/5/2021 Completion Date 7/21/2019 HEW GDSR-5/24/21SFD 5/24/2021 * SFD 5/24/2021 *(*See Note to File dated May 21/2021) MGR25JUN2021 If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost - Base Formation at total depth: Contact Name:Noel Nocas Contact Email: Noel.Nocas@hilcorp.com Authorized Name:Stan Golis Authorized Title:Sr. Area Operations Manager Authorized Signature with Date: Contact Phone:907.564.5278 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. 12464' 12470' 12555' 12788' 8838' 8842' 8886' 8888' Sag River Kicked off from Parent well (F-48) Shublik Sag River (from Base) Sag River (from Base) 28.CORE DATA Conventional Core(s)Yes No Sidewall Cores Yes No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. Well Tested? Yes 12788'8888' Top of Productive Interval 12464'8838' NoPermafrost - Top TVDMDNAME 30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered): Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 31. Summary of Drilling Reports, Wellbore Schematic, Directional SurveysList of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.05.03 13:35:00 -08'00' Stan Golis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y Samantha Cadisle at 1:52 pm, Jun 17, 2020 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown 0 Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other Extension through 0 7/30/2021 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 5. Permit to Drill Number: 219-100 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service El6. API Number: 50 029-22187-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 PBU F -48A 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028280. 028277 & 028278 PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13000 8866 13000 8866 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 32-112 32-112 Surface 2724 13-3/8" 31 -2755 31 -2679 5020 2260 Intermediate 12432 9-5/8" 29-12461 29-8836 6870/5750 4760/3090 Production Liner 275 7" 12195 - 12470 1 8655-8842 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None 4-1/2" 12.6# 13Cr80 27-12257 Packers and SSSV Type: 4-1/2" Baker S-3 Packer Packers and SSSV MD (ft) and TVD (ft): 12071 /8572 4-1/2" TIW HBBP Packer 12170/8639 12, Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: June 30, 2020 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Stone, Christopher be deviated from without prior written approval. Contact Email: Christopher.Stone(a)bp.com Authorized Name: Stone, Christopher Contact Phone: +1 907 564 5518 Authorized Title: D & K Pad / GC1 Lead Petroleum Engineer Digitally 16:43:21-08'r5tone Date: Authorized Signature: Christopher Stolle Date: 2020.06.17 16:43:21 -08'00' COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 320-270 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Operations shut down extension approved through 30 -July -2021 to allow new operator to evaluate and execute well work/drilling options. Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No IR Subsequent Form Required:10-404 APPROVED BYTHE Approved by: M ' COMMISSIONER COMMISSION Date: 7/17/2020 Comm. Comm. JLC 7/16/2020 JSr Pet Eng MGR16JUL20 Sr Pet Geo DLB 06/17/20 ISr Res Eng RBDMS HEW 7/21/2020 Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. F -48A was placed in Operations Shutdown due to a failed CTD sidetrack attempt where we lost the hole while drilling. BP would like to request an extension on F -48A to allow Hilcorp to have the opportunity to evaluate the well and determine whether or not they feel it is prudent to attempt to sidetrack again or repurpose the well as they see fit. TREE= 4-1/16"CNV WaL EAD- 13-5/8" FMC ACTUATOR= 13AK132 OKB. BEV = 64.83' BF. BBV = ._._ —_.35-71 KOP= _ --- --1800' Max Angle = 57" 6,i628" Datum MD = 12504' Datum TVD = 8800' SS OPS SHUTr- -WN Or CONDUCTOR, 112' D= 9-5/8" CSG, 47# L-80 HYD 563, D = 9.875" 1-1 1742' 13-3/8" CSG, 684t, NT -80 BUTT, ID = 12.415" 1—{ 2766' Minimum ID = 3.805" @ 12245' 4-1/2" PARKER SWN MILLED NIP 4-112" TBG, 12.6#, 13CR-80 VAM TOP, 12153' _0152 bpf, D = 3.958" 4-1/2" TBG STUB (10111/07) 12161' TOP OF 7" LNR 1219V 4-12" TBG, 12.6#, NT13-CR, 12257' _0152 bpf, D = 3.958" 9-5/8" CSG, 47#, NT -80S NSCC, ID = 8.681' 1246V 14-1/2'X 7' DELTA WHIPSTOCK L/_/19) 12466' 4-1/2-X 7" DELTA WHIPSTOCK (07/01/19) 1-1 12496' PERFORATION SUMMARY REF LOG: HLS BHCS ON 0729/91 ANGLE ATTOP PERF: 48'@ 12480' Note: Referto Production DB for historical perfdata SIZE SPF INTERVAL 0pnfSqz SHOT SQZ 2-78" 6 12480 -12530 C 1222/16 2-5/8" 6 12480 -12510 C 03/19/92 3-3/8" 6 12653 -12678 C 0927/91 PBTD 13093' 7" LNR 26#, 13CR-80, .0383 bpf, D = 6.276" 13176' F _48A SAFET" )TES: ***CHROME TBG & LNR* ' NOTE I— fORICAL PROBLEMS RETRIEVING TOOLS THRU THE TAILPIPE DEFORMITY /OBSTRUCTIONS IDENTIFIED ON BHTV SURVEY 08/02192 1732' 9-518" HES ES CEMENTER 2067' 4-112" HES X NIP, ID = 3.813" 3T MD I TVD I DEV TYPE I VLV LATCH PORT DATE 5 3126 2976 41 MMG DMY RK 0 0522119 4 6122 4772 52 MMG DMY RK 0 03/09/08 3 8144 5968 53 MMG DIMY RK 0 0522119 2 9721 6967 49 MMG DMY RK 0 1021/07 1 11092 7915 48 MMG DMY RK 0 0522119 12046' -j4-1/2" HES X NIP, ID= 3.813" 12065' 9-5/8" X4-12" CR S-3 PKIR ID = 3.870" 12090' 1--] 4-12" HES X NIP, ID = 3.813" 12166' -{ 9-5/8'X4-1/2" UNIQUE OVERSHOT 12169' RIGHT-HAND RELEASE LATCH 12170' 9-5/8" X4-12" TNV HBBP PKR D = 3.875" 12196' I-19-5/8" X 7" TNV LNR HGR D = ? 12223' I-14-1/2- PARKER SWS NP, [D= 3.813' 12245' 14-12" PARKER SWN NIP MILLED TO 3,805'(6/15/19) 12267'-j4-112" WLEG, D = 3.958" 12267' ELMD TT LOGGED 0927/91 MIL LOUT WINDOW (F -48A) 12470' -' 13000' I-101-1 12970' 1-10H 12540' ELM 1-1 TOC PLUG (06/17119) 12550' ELM 4-1/2" POSISET PLUG (06117/19) PRUDHOE BAY UNIT WELL: F -48A PERMIT No: 219-100 API No: 50-029-22187-01 SEC 2, T11 N, R13E, 3362' FSL & 2863' FEL DATE REV BY COMMENTS DATE REV BY COMMENTS 08/04191 N18E ORIGINAL COMPLETION 0624119 BTN/JMD MILL XN NP, SET PLUG & TOC 10122/07 NOES RWO 07/15/19 JNUJMD SET WHIPSTOCK & MILL OH 12/18/18 CJN/JMD PULLED IBP/BP STOP & REMO 0722/19 JNUJMD OPS SHUTDOWN (0721/19) 12/18/18 JPKIJMD GLV C/O (06/08/18) 12/18/18 JMG/JMD GLV C/O 12/06/18 BP Exploration (Alaska) 06/05/19 JPK/JMD I GLV C/O (0522/19) BER PRINT GHES TGE company COMPANY BP Exploration Alaska Inc. WELL NAME F-48APB1 FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(c)bhge.com STATUS Final COMPANY Replacement: No 219140 31338 DISTRIBUTION LIST Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE July 4, 2019 TODAYS DATE October 18, 2019 Revision Details: Rev. Requested by: FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES J#OFCOPIES ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION n V 1 BP North Slope. EOA, PBOC. PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 Benson Blvd. rage, Alaska 99508 Anchorage, 2 ConocoPhillips Alaska Inc. 1 Attu: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 Exxon Mobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 13201 C Street, Suite 505 (Anchorage, AK 99503 4 State of Alaska - AOGCC 1 1 iAttn: Natural Resources Technician 11 '333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 1 Attn: Resource Evaluation _550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 1900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 BAYER0PRINT DISTRIBUTION LIST UGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME F -48A FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska 219140 3133 1 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1_132-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE July 20, 2019 AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a)bhge.com TODAYS DATE October 18, 2019 Revision STATUS Final Replacement: No Details: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION Rev. Requested by: FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) IT -OF PRINTS # OF COPIES # OF COPIES 1# OF COPIES 4 4 4 4 4 4 4 t BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E.Benson Blvd. Anchorage, Alaska 99508 `YO n.. T 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 I ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 1 OGCC 1 5 DNR -Division of Oil & Gas *** 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 STATE OF ALASKA 4SKA OIL AND GAS CONSERVATION COMMIS: REPORT OF SUNDRY WELL OPERATION 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown 2 Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 219-100 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic El Service El6. API Number: 50-029-22187-01-00 7. Property Designation (Lease Number): ADL 028280, 028277 & 028278 8. Well Name and Number: PBU F -48A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: MWD / GR / RES PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 13000 feet Plugs measured None feet true vertical 8866 feet Junk measured None feet Effective Depth: measured 13000 feet Packer measured 12071, 12170 feet true vertical 8866 feet Packer true vertical 8572. 8639 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32-112 32-112 Surface 2724 13-3/8" 31 -2755 31 -2678 5020 2260 Intermediate 12432 9-5/8" 29- 12461 29-8836 6870 4760 Production Liner 275 7" 12195 - 12470 8655 -8842 8160 7020 Perforation Depth: Measured depth: None feet True vertical depth: feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 27-12257 27-8698 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Packer 12071 8572 true vertical depth) 4-1/2" TIW HBBP Packer 12170 8639 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Op Shutdown Subsequent to operation: Do Shutdown 14. Attachments: (required Per 20 AAC 25 070.25.071, & 25 283) 15. Well Class after work: Daily Report of Well Operations p Exploratory ❑ Development p Service ❑ Stratigraphic ❑ 16. Well Status after work: Oil Z Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-348 Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R Authorized Title: SIM Specialis Contact Email: Ryan. Ciolkosz(cDbp. com Authorized Signature: Date: I 1 Contact Phone: +1 907 564 5977 Al dU ----I v �/j/�/ GAJ 7 p (�(��{ Q Form 10-404 Revised 04/2017 O J 11 Y Y /�—�'A,a Submit Original Only Printed 7/25/2019 9:34:o0AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 1 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) - (usft) 6/30/2019 02:30 06:30 4.00 MOB P PRE RIG IS RELEASED FROM C -19C AT 0230 PREP FOR RIG MOVE AND PULLING OFF WELL. PJSM WITH PEAKAND NABORS CREWS THEN PULL OFF C-19. MOVE RIG TO F -PAD. 06:30 08:00 1.50 MOB P PRE ARRIVE F -PAD. REMOVE JEEPS FROM BOTH MODULES. MOVE SUB INTO POSITION TO PULLOVER THE WELL. 0800 0930 1.50 MOB P PRE UNHOOK THE TRACTOR AND HOOKUP THE WALKER. USE THE WALKER TO SPOT THE SUB THE FINAL DISTANCE OVER THE WELL. REMOVE THE WALKER AND SET THE SUB DOWN. _ 09:30 15:00 5.50 MOB P PRE SPOT THE PIT MODULE AND SET IT DOWN. ACCEPT RIG AT 10:30. CONDUCT PJSM FOR RIG UP CHECKLISTS. COMPLETE RIG UP CHECKLISTS. SPOT TIGER TANKAND AUXILLIARY EQUIPMENT. LTT ON TREE VALVES THEN REMOVE TREE CAP AND INSTALL BOPS. 15.00 18 30 3.50 RIGU P PRE SERVICE TREE VALVES. M/U INJECTOR. VALVE CREW VERIFIED TORQUE CIRCULATE FRESHWATER FORWARD TO FILL REEL. 18 30 2000 1 50 RIGU P PRE TEST BOTH VISUAL AND AUDIBLE LELALARM 5%/40% AND H2S ALARMS AT 5 PPM/ 10 PPM GOOD TEST PERFORM SHELL TEST TO 4000#. TROUBLESHOOT. C13 OR C14 LEAKING. (ISOLATION VALVES FOR C9 /C10 BACKWARDS TEST) CONTINUE WITH BOPE TEST 2000 0000 4.00 BOPSUR P PRE INITIAL BOPE TEST TO BOTH BP / AOGCC REQUIREMENTS WITNESS WAIVED BY AOGCC MATT HERRERA 7-1/16" ANNULAR, BLIND / SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" x 3.5 VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALL TESTS WILL BE 250 PSI LOW/ 3500 PSI HIGH HELD FOR 5 MIN EACH TEST 1: IRV, PACKOFF PASS TEST 2: BLIND / SHEAR, R1, BL1A, 81, B4 PASS - TEST 3: ANNULAR (2-3/8") TIW#1, B3, B2, BL1 PASS - TEST 4: UPPER 2-3/8" PIPE -SLIP, TIW#2, BL2, R2, T2, C15 PASS TEST 5: C16, T1, C11 PASS TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2. TV1 LEAKING BY ON LOW. BLEED PRESSURE OFF. SERVICE VALVE Printed 7/25/2019 9:34:o0AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 AFE No K3-019CR-C: (2,778,074.00 ) Page 2 of 35 Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. ' BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- ——_ (hr) (usft) 7/1/2019 00:00 03:30 3.50 BOPSUR P PRE INITIAL BOPE TEST TO BOTH BP /AOGCC REQUIREMENTS WITNESS WAIVED BY MATT HERRERA CONTD 7-1/16" ANNULAR, BLIND / SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" x 3.5' VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALL TESTS WILL BE 250 PSI LOW / 3500 PSI HIGH HELD FOR 5 MIN EACH - TEST 6: VARIABLES (2-3/8"), C7, C9, CIO, TVI. TV1 LEAKING BY ON LOW. BLEED PRESSURE OFF. SERVICE VALVE. TV1 STILL LEAKING . ISOLATE AND CONTINUE WITH TEST TEST 6: VARIABLES (2-3/8"), C7, C9, C10 PASS TEST 7: LOWER 2-3/8" PIPE -SLIP, C5, C6, C8, TV2 PASS TEST 8: CHOKE A, CHOKE C PASS ACCUMULATOR DRAWDOWN TEST REPLACE FAILED TV1 TEST 9: ANNULAR (3-1/2"), C1, C4, TEST REPLACEMENTTVI PASS TEST 10: VARIABLES (3-1/2"), C2, C3 PASS SERVICE TEST C14 PRIOR TO TESTING C9 / CIO BACKWARDS. STILL LEAKING. REBUILD C-13 03 30 04 00 _ 0.50 BOPSUR P PRE SIMOPS: BHI INSTALLED FLOATS / TESTED TO 4000#. GOOD TEST 04:00 - 06:00 2.00 BOPSUR P PRE FLUID PACK FOR C9 / C10 BACKWARDS TEST TEST 250 PSI LOW/ 3500# HIGH. GOOD TEST INSTALL DRILLING RISER. 06:00 - 06:30 0.50 KILLW P PRE CONDUCT RIG EVAC DRILL WITH WARD CREW. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 3 MIN. CONDUCT AAR FOLLOWED BY F-48 PRE -SPUD. 06:30 - 08:30 2.00 KILLW P PRE LINE UP VALVES AND PT DRILLING RISER, GOOD. FILL REEL WITH MUD. 08.30 10:00 1.50 KILLW P PRE CALIBRATE OUT MM WITH FRESH WATER. BUILD 50 BBLS HI -VIS MUD FOR BULLHEAD. CONDUCT PJSM FOR BULLHEADING WELL. 10:00 12:30 2.50 KILLW P PRE BULLHEAD WELL AT 5 BPM. PUMP 5 BBLS MEOH 270 BBLS KCL 50 BBLS HI -VIS MUD 147 BBLS MUD FINAL PUMP PRESSURE IS 1060 PSI. 1230 1300 0.50 STWHIP P WEXIT SHUT DOWN PUMP, ALLOW PRESSURE TO BLEED OFF. PURGE RISER OUT TO TIGER TANK. BRING RETURNS BACK INSIDE, 10 MIN LOSSES IS 6.4 BBLS. PJSM FOR PICKING UP WHIPSTOCK BHA, Printed 7/25/2019 934 OOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 3 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 i Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 13:00 13:30 0.50 STWHIP P WEXIT MAKE UP WHIPSTOCK BHA#1 - SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON -.13:35 13:30 14:00 0.50 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 12445' (FORMATION) WITH -25' CORRECTION 14:00 18:30 4.50 STWHIP P 12,496.00 WEXIT RIH WITH WHIPSTOCK BHA#1. 18 30 - 2200 2200 - 00:00 7/2/2019 0000 - 01:00 01 00 - 02:00 3 50 STWHIP 12,496.00 P i 2.00 i STWHIP WEIGHT CKAT 12400' IS 60K. I 12,496.00 P 1.00 STWHIP N DEPTH WITH SLB CBT LOG DATED 12,496.00 09 -SEPT -1991 - SET TOP OF WHIPSTOCKAT 12496' @ 30° 1.00 - PICK OFF WHIPSTOCKAND PAINT WHITE 12,496.00 STWHIP N Printed 7/25/2019 9 34:ooAM **All depths reported in Drillers Depths** - RATE: 0.98 BPM IN, 0.55 BPM OUT. CIRC PRESSURE: 1100 PSI MUD WEIGHT: 8.53 PPG IN, 8.44 PPG OUT WEIGHT CKAT 12400' IS 60K. -LOG GR TIE IN WITH -25' CORRECTION. - LOG CCL LOG. COLLARS CAME IN ON DEPTH WITH SLB CBT LOG DATED 09 -SEPT -1991 - SET TOP OF WHIPSTOCKAT 12496' @ 30° ROHS. STACK 5K. GOOD SET - PICK OFF WHIPSTOCKAND PAINT WHITE FLAG AT 12439.19'(12,359- EOP) - ATTEMPT TO BRING UP TO DRILLING RATE. 1009/6 LOSS RATE. — - WEXIT POOH ON LOSSES MUD WEIGHT: 8.51 PPG IN, 8.49 PPG OUT RATE: 0.54 BPM IN, 1.04 BPM OUT PUMP 1 DOWN COIL, CHARGE PUMP DOWN KILL LINE -PERFORM 10 MIN FLOW CHECK, FILL WELL, STATIC LOSS RATE AT SURFACE -12-15 BPH_. WEXIT PJSM, LAY DOWN WHIPSTOCK SETTING BHA MAKE UP WINDOW MILLING BHAAND STAND -BACK. PREPARE FOR DIAMOND SEAL TREATMENT. F-48 PRESPUD WITH ROY CREW. WEXIT PJSM WITH INCOMING CREW - RUN THROUGH VALVE ALIGNMENTAND HOW WE WILL -PULL THE LCM. WEXIT PUMP 16 PPB DIAMOND SEAL PILL - MIX AND PUMP 46 BBLS OF DIAMOND SEAL ONCE ALL PRODUCT DUMPED 20 BBLS FRESHWATER 154 BBLS OF 8.6 PPG OD -N. PUMPED AT 5.5 BPM @ 1500# TILL WITHIN 20 BBLS OF PERFS. - SLOW RATE TO 2 BPM @ 1184#. ONCE DIAMOND SEALAT PERFS. PRESSURE GRADUALLY BUILDING TO 1700# WHILE WE -PUSHED HALF THE PILL INTO PERF. STARTED BACKING RATE DOWN TO 1 BPM AS PRESSURE CONTINUED TO CLIMB. FINAL PRESSURE WAS 1 BPM @ 1645# SHUT PUMP DOWN. Printed 7/25/2019 9 34:ooAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 4 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 02:00 - 03:30 1.50 STWHIP N 12,496.00 WEXIT 1 HR SOAK PRESSURE SLOWLY FALLING FROM 1645# TO 173# - CLOSE IN MPD. EQUALIZE. OPEN SWAB. COME ONLINEAT 0.5 BPM. PRESSURE UP TO 650#. IMMEDIATELY. - DISCUSS WITH ODE. NOT WANTING TO GO ANY HIGHER. BLEED PRESSURE OFF. CIRCULATE ACROSS TOP TO ACCESS LOSS RATE. LOSSES HEALED TO 1:1. 03:30 04:30 1.00 STWHIP P 12,496.00 WEXIT MONITOR WELL FOR 10 MIN FLOW CHECK. WELL STATIC MAKE UP WINDOW MILLING BHA INJECTOR ON AT 04:15 TEST QTS TO 3500# GOOD TEST 04:30 07:00 2.50 STWHIP P 12,496.00 WEXIT RIH 0.49 BPM IN RATE / 0.98 BPM OUT RATE - -_ 8.53 PPG IN / 8.52 PPG OUT - 0700 0900 2.00 STWHIP P 12,501.00 WEXIT STOP AT FLAG AND CORRECT -31.2'. R I H DRY, TAG AT 12497'. START MILLING WINDOW. AT PINCH POINT RESET DEPTH TO 12501.3'. MILL 3.8" WINDOW IN 7" CASING PER BAKER REP FROM 12501.3' MD TO 12502.3' MD RATE: 2.83 BPM IN, 1.18 BPM OUT MUD WEIGHT: 8.60 PPG IN, 8.47 PPG OUT DWOB: 1 - 3 KLBS CIRC PRESSURE: 3310 PSI ECD = 10.57 PPG 09:00 16:20 7.33 STWHIP P 12,501.00 WEXIT CONTINUE MILLING WINDOW AT 12502.3'. BIG SLUG OF DIAMOND SEAL COMES BACK OVER SHAKER. ANNULAR PRESSURE AND ECD DROP AFTER i WELL CLEANS UP. RETURNS BETTER. MILL 3.8" WINDOW IN 7" CASING PER BAKER REP FROM 12502.3' MD TO 12510.5' MD. RATE: 2.85 BPM IN, 2.12 BPM OUT MUD WEIGHT: 8.57 PPG IN, 8.50 PPG OUT DWOB: 1 - 4.6 KLBS CIRC PRESSURE: 3030 PSI ECD = 9.90 PPG AT 12505.6' DWOB FALLS OFF TO 0.5K. CONTINUE TIME MILLING SCHEDULE. - REDUCE PUMP RATE TO 2.67 BPM TO HELP WITH VIBRATION. 12508' SAMPLE HAS 10% FORMATION. 16:20 - 18:00 1.67 STWHIP P 12,501.00 WEXIT MILL RATHOLE FROM 12510.5' TO 12519'. PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. ROP IS 20 FT/HR WITH 2.5K DWOB. 2.70 / 2.36 BPM WITH 8.55 / 8.48 PPG IN / OUT. CONDUCT REAMING PASS AT 1 FT/MIN. UP, DOWN, UP, NOTHING SEEN. DRY DRIFT TO 12519' IS CLEAN, SOLID TAG. PICK UP ABOVE WHIPSTOCKAND DYNAMIC FLOW CHECK, GOOD 1.0 / 0.77 BPM FOR 10 MIN. 18.00 20 30 2.50 STWHIP P 12,501 00 WEXIT MONITOR WELL FOR 10 MINUTES: STATIC MUD WEIGHT: 8.54 PPG IN, 8.47 PPG OUT RATE: 2.61 BPM IN, 2.00 BPM OUT Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 5 of 35 1 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project. PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 20:30 - 2200 1.50 STWHIP P 12,501.00 WEXIT MONITOR WELL FOR 10 MINUTES AT BHA: STATIC 22:00 - 00:00 2.00 DRILL 7/3/2019 00:00 - 01:30 1.50 DRILL 01 30 - 0430 3.00 DRILL ROP: 10-20 FT/HR, WOB: 1.5 - 3.0 KLBS 04:30 17:30 13.00 DRILL P 12,970.00 PROD1 DRILL 4-1/4" BUILD FROM 12,558' MD TO 12,970' MD FREE SPIN: 3200 PSI, 2.86 BPM RATE: 2.86 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3200 - 3420 PSI MUD WEIGHT: 8.61 PPG IN, 8.56 PPG OUT, ECD: 9.94 PPG AT WINDOW - ROP: 30 - 60 FT/HR, WOB: 1.5 - 3.0 KLBS. -AT 12670 PULL 150' WIPER, CLEAN PASS UP AND DOWN. AT 12730' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - AT 12820' PULL 150' WIPER, CLEAN PASS UP AND DOWN. - ROP SLOWS TOWARD 12950', DRILLING BACK UP THROUGH THE HARD SPOT ENCOUNTERED EARLIER JUST OUTSIDE THE WINDOW. - AT 12960' PUMP 5 BBLS LO / HI VIS SWEEPS, PREP FOR LONG WIPER. Printed 7/25/2019 9:34 OOAM **All depths reported in Drillers Depths" CLOSE EDC, POWER DOWN INJECTOR OFF: 20:30 LAY BHA DOWN. P 12,501.00 PROD1 RIH WITH 4-1/4" DRILLING BHA#3 RATE: 0.99 BPM IN, 1.08 BPM OUT. CIRC PRESSURE: 1001 PSI MUD WEIGHT: 8.51 PPG IN, 8.48 PPG OUT P 12,519.00 PROD1 RIH WITH 4-1/4" DRILLING BHA#3 RATE: 0.99 BPM IN, 1.08 BPM OUT. CIRC PRESSURE: 1001 PSI MUD WEIGHT: 8.51 PPG IN, 8.48 PPG OUT LOG DOWN FOR TIE-IN FROM 12,500' TO 12536.2' MD (FORMATION) WITH -27' CORRECTION DRY TAG BOTTOM. PU AND RECORD PARAMETERS P 12,558.00 PROD1 DRILL 4-1/4" BUILD FROM 12,519' MD TO 12,558' MD FREE SPIN: 3234 PSI, 2.80 BPM RATE: 2.80 BPM IN, 2.44 BPM OUT. CIRC PRESSURE: 3267 - 3413 PSI MUD WEIGHT: 8.59 PPG IN, 8.50 PPG OUT, ECD: 9.75 PPG AT WINDOW ROP: 10-20 FT/HR, WOB: 1.5 - 3.0 KLBS 04:30 17:30 13.00 DRILL P 12,970.00 PROD1 DRILL 4-1/4" BUILD FROM 12,558' MD TO 12,970' MD FREE SPIN: 3200 PSI, 2.86 BPM RATE: 2.86 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3200 - 3420 PSI MUD WEIGHT: 8.61 PPG IN, 8.56 PPG OUT, ECD: 9.94 PPG AT WINDOW - ROP: 30 - 60 FT/HR, WOB: 1.5 - 3.0 KLBS. -AT 12670 PULL 150' WIPER, CLEAN PASS UP AND DOWN. AT 12730' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - AT 12820' PULL 150' WIPER, CLEAN PASS UP AND DOWN. - ROP SLOWS TOWARD 12950', DRILLING BACK UP THROUGH THE HARD SPOT ENCOUNTERED EARLIER JUST OUTSIDE THE WINDOW. - AT 12960' PUMP 5 BBLS LO / HI VIS SWEEPS, PREP FOR LONG WIPER. Printed 7/25/2019 9:34 OOAM **All depths reported in Drillers Depths" Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE (RON) North America - ALASKA - BP Operation Summary Report Start Date: 6/30/2019 End Date: 7/21/2019 AFE No X3-019CR-C: (2,778,074.00) Page 6 of 35 Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - - (hr)— - -- -- - (usft) - 17:30 - 21:45 4.25 DRILL P 12,970.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 12970' MD RATE: 2.86 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 3280 PSI - OVERPULLAT WINDOW OF -3.5K JOG BACK IN AND PULL BACK THROUGH CLEAN. -OPEN EDC WITH BIT ABOVE WINDOW -ATTEMPT TO JET TRAY, SETTING DOWN 5-8K AT TOP OF OF WHIPSTOCK, CHANGE ORIENTATION AND ATTEMPT TO PASS THROUGH WITH PUMPS AT 2.16 BPM, TURN OFF PUMPS WITH MOTOR ORIENTATED AT 130L PASS THROUGH TOP OF WHIPSTOCK BUT HANG UP AT 12506' ATTEMPT TO WORK THROUGH AT DIFFERENT ORIENTATIONS AND PUMP RATES NOTABLE TO PASS THROUGH, CONTINUE WIPER TRIP TO 12000 AT 3.8 BPM THROUGH OPEN EDC. - RUN BACK IN HOLE TAG UP ON X NIPPLE AT 12045 CHANGE ORIENTATIONS WITH NO SUCCESS, SET DOWN 5K AND ROLL OREINTATOR AND PASS THROUGH AT 20L. SET DOWN ON X NIPPLE AT 12090' SET DOWN 5K AND ROLL ORIENTATOR AND PASS THROUGH, SET DOWN 5 K ON SWS NIPPLE AT 12245' AND ROLL ORIENTATOR AND PASS THROUGH. SET DOWN 5K ON TOP OF WINDOWAND ROLL OREINTATOR WITH NO SUCCESS. PICK UP CLEAN AND CLOSE EDC, PUMP AT 1 BPM TO ROLL BIT, TURN OFF PUMP AND ATTEMPT TO PASS THROUGH WINDOW. PICK UP PUMP AT 0.75 BPM TO TIGHT SPOT AND TURN OFF PUMPS AND ROLL ORIENTATOR WITH NO SUCCESS. -DISCUSS OPTIONS WITH ODE AND ACTING FIELD SUPERINTENDENT AND DECIDE TO PUMP SWEEP AND POOH FOR A WINDOW DRESSING RUN. 21.45 00:00 2.25 DRILL N 12.970 00 PROD1 PUMP 10 X 10 BBL LOW/HI VIS SWEEP AND POOH PUMP AT 3.8 BPM AT 3480 PSI STATIC FLOW CHECK FOR 10 MINUTES PRIOR TO REACHING BHA -NO FLOW 7/4/2019 01:00 - 04:00 3.00 DRILL N 12,970.00 PROD1 RIH WITH 3.80" WINDOW DRESSING BHA #4 - RATE: 0.51 BPM IN ,0.98 BPM OUT. CIRC PRESSURE: 885 PSI MUD WEIGHT: 8.60 PPG IN, 8.58 PPG OUT LOG DOWN FOR TIE-IN FROM 12,400' TO 12454.88' MD (FORMATION) WITH -31' CORRECTION - DRY TAG AT 12503' CLOSE EDC. PU AN D RECORD PARAMETERS Printed 7/25/2019 9 34:0OAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 7 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 04:00 06:00 2.00 DRILL N 12,970.00 PROD1 DRESS WINDOW PER BAKER REPAND OCN #3 - RATE: 2.87 BPM IN, 2.75 BPM OUT MUD WEIGHT: 8.67 PPG IN, 8.59 PPG OUT - DWOB: 1 - 4.6 KLBS CIRC PRESSURE: 3019 PSI ECD = 10.10 PPG MILUDRESS AT 1 FPM FROM 12498' TO 12511' -OBSERVE 40-60 PSI MOTOR WORK AT 12503, 12507 WITH NO INCREASE IN WOB - PULL UP TO 12498' MILUDRESS AT 1 FPM FROM 12498' TO 12511 X 3 MILLING UP AT 210 DEGREES, 60 DEGREES AND 0 DEGREES DRY DRIFT THROUGH WINDOW IS CLEAN, TAG AT 12517' FORMATION. BRING PUMPS UP TO 2.8 BPM, WASH DOWN TO 12519' WITH NOTHING SEEN. 0600 0900 3.00 DRILL N 12,970.00 PROD1 'PICK UP ABOVE WINDOW AND DO 50' JOG. OPEN EDC, FLOW CHECK WELL. NO FLOW. POOH. PUMP 3.8 BPM / 3550 PSI. REBEND MOTOR OFFLINE WHILE POOH, BUILD BHA #5 0616 07:16 1.00 DRILL N 12,970.00 PROD1 SWAP BHA'S -CHECK LAST 80' OF COIL FOR DAMAGE -GOOD -INJECTOR OFF AT 0025 HRS -STAND BACK BUILD BHA -RIH FROM DERRICK WITH WINDOW DRESSING BHA -MAKE UP INJECTOR AND TEST QTS TO 3500 PSI -GOOD -INJECTOR ON AT 0050 HOURS 09.00 10:00 1.00 DRILL N 12,970.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 09:05. INSPECT LAST 80' OF CT, NOTHING SEEN. BOTH MILLAND REAMER 3.80 GO, 3.79 NO-GO. MAKE UP 4.25" DRILLING BHA #5 - PICK UP 2-7/8" ULS MOTOR (2.3 DEG AKO) AND 3" COILTRAK TOOLS MAKE UP 4.25" HYC BICENTER BIT SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES INJECTOR ON: 09:40. 10.00 1300 3.00 DRILL N 12,970.00 PROD1 RIH WITH 4.25" DRILLING BHA#5 BREAK DOWN BHA #4 OFFLINE WHILE RIH. RATE: 0.52 BPM IN, 0.97 BPM OUT. CIRC PRESSURE: 955 PSI MUD WEIGHT: 8.59 PPG IN, 8.58 PPG OUT LOG DOWN FOR TIE-IN FROM 12410' MD (FORMATION) WITH -25' CORRECTION. Printed 7/25/2019 9 34:OOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. — - -- - — BPUOI: USA00000765 Active datum: datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 13:00 - 15:40 2.67 DRILL P 12,970.00 PROD1 CLOSE EDC. 1540 - 17:30 1.83 DRILL P 17 30 - 18:15 0.75 DRILL P PASS THROUGH WINDOW AT 30R, 20 FT/MIN, 0 PUMP WITH NO ISSUES. AFTER 12900' HAVING TROUBLE GETTING BACKTO BOTTOM. STACKING WEIGHT AND HAVING TO WASH DOWN. - PULL WIPER BACK TO 12650' AND PUMP 5 BBLS LO / HI VIS SWEEPS. DRAGGING WEIGHT, -6K ON DWOB THEN FALLS OFF. - RIH FROM 12650'. RUN 2.5 BPM / 10 FT/MIN THROUGH TROUBLE SPOT. STACKING WTAT 12890' - PICK UP 4K DWOB. RUN 2 BPM / 15 FT/MIN, STACKING WEIGHT AT 12960' - PULLING 65 - 68K WITH -7 DWOB. ANNULAR PRESSURE SPIKES 450 PSI. WIPER TRIP BACK TO WINDOW TO CLEAN THE HOLE. TURN AROUND JUST BELOW WINDOW AND RIH, CONTINUE TO TRY AND CLEAN OUT THE WELL. RIH 2.7 BPM / 15 FT/MIN STACK WT AT 12890'. PICKUP 3K OVERPULL ON DWOB. PULL SHORT WIPER AND RIH 2.7 BPM / 11 FT/MIN, WASH DOWN TO 12893'. PICKUP IS CLEAN. TRY AGAIN 2.7 BPM / 5 FT/MIN, STACKAT 12890'. PICKUP IS 59K. RIH 2.3 BPM / 10 FT/MIN, STACK WTAT 12892'. CONTINUE WORKING TO BOTTOM. OVERPULL TO 65K, -5K ON DWOB. BUILD WEIGHTED SWEEP. TRY TO PASS 12894 AT 1 BPM / 25 FT/MIN, STACKING WEIGHT. PICK UP AND TRY 2.7 BPM / 4 FT/MIN, STACKING WEIGHT. 12,970.00 PROD1 EASE DOWN FROM 12890' AND REAM BACK TO BOTTOM. AFTER 5 FTAPPEAR TO BE DRILLING NEW HOLE. DISCUSS SETTING BILLET WITH ODE. PULL WIPER TRIP TO WINDOW. AT 12670' ANNULAR PRESSURE INCREASES BY 300 PSI, RUN BACK DOWN. START 5 BBL WEIGHTED SWEEP DOWN THE CT. PULL THROUGH AGAIN, NOTHING SEEN. JOG 50' JUST BELOW WINDOW. PULL THROUGH WINDOWAT0.4 BPM, SLIGHT OVERPULL SEEN -3K ON DWOB. PULLABOVE WINDOWAND DOA60 FT JOG THEN OPEN EDC. PARTIAL PACKOFF WHILE DOING JOG. SWEEP BRINGS BACK FINE CUTTINGS ONLY. PERFORM DYNAMIC FLOW CHECK, GOOD. 12,970.00 PROD1 POOH FOR BILLET PERFORM DYNAMIC FLOW CHECK, GOOD PUMP WEIGHTED SWEEP AND PULL THROUGH 7" AT 20' PER MINUTE - AT 12350' PULL 25K OVER AND LOSE RETURNS, SUPSPECT PACK OFF, ABLE TO FUNCTION HOT AND NO DWOB OBSERVED WHILE TRYING TO WORK PIPE. +25K / -10K Printed 7/25/2019 9 34:OOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 9 of 35 Common Well Name: F-48 AT 12350' PULL 25K OVER AND LOSE AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F -- TO WORK PIPE WITH NO RETURNS. Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. - BRING COIL TO NEUTRAL WT AND SHUT I BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) COIL FROM 12350' TO 12460' BRING PUMPS Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) MAKE PROGRESS UP TO 12340' OPEN EDC (usft) _ 18:15 - 22:00 3.75 DRILL N 12,970.00 PROD1 WORK PIPE Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths" AT 12350' PULL 25K OVER AND LOSE RETURNS, SUPSPECT PACK OFF, ABLE TO FUNCTION HOTAND NO DWOB OBSERVED WHILE TRYING TO WORK PIPE. +25K/ -10K - REDUCE PUMP RATE TO 0.25 AND ATTEMPT TO WORK PIPE WITH NO RETURNS. - CLOSE EDC AND CONTINUE TO ATTEMPT TO WORK PIPE - BRING COIL TO NEUTRAL WT AND SHUT OFF PUMPS FOR 5 MINUTES, ABLE TO MOVE COIL FROM 12350' TO 12460' BRING PUMPS UP TO 2 BPM WITH NO RETURN 11.5 ECD AT DPS, DROP RATE TO 1 BPM AT 11.0 PPG ECD. MAKE PROGRESS UP TO 12340' OPEN EDC AND BRING PUMP UP TO 2.2 BPM / 4000 PSI 14.5 PPG ECD FOR SHORT DURATION, UNABLE TO ESTABLISH RETURNS, UNABLE TO MOVE PIPE. LINE UP DOWN BACK SIDE AND PRESSURE UP TO 500 PSI AND DUMP PRESSURE WITH NO SUCCESS TWICE NOTE: MONITORING ANNULUS PUMPING ACROSS TOP -STABLE FLUID COLLUMN, ANYTIME ECDS ARE OVER 11.0 PPG UNABLE TO MOVE PIPE. DISCUSS OPTIONS MOVING FORWARD WITH ODE, ACTING SUPERINTENDENT AND ACTING ETL-DECIDE TO LET ECDS BLEED DOWN TO 11.0 PPG BEFORE TRYING ADDITIONAL OPTIONS. 22 00 00:00 2.00 DRILL N 12,970.00 PROD1 WAIT ON ECDS BELOW PACK OFF TO BLEED DOWN TO 11 PPG WORK PIPE -20K / +20K EVERY HALF HOUR TO MINIMIZE COIL FATIGUE ECD AT 2200 HRS 13.7 PPG ECD AT MIDNIGHT 13.5 PPG NOTE: MONITORING ANNULUS PUMPING ACROSS TOP -STABLE FLUID COLLUMN 7/5/2019 00 00 08:00 8.00 DRILL N 12,970.00 PROD1 WAIT ON ECDS BELOW PACK OFF TO BLEED DOWN TO 11 PPG WORK PIPE -20K / +20K EVERY HALF HOUR TO MINIMIZE COIL FATIGUE ECD AT MIDNIGHT 13.5 PPG ECD AT 0230 HRS 12.9 ECD AT 0500 HRS 12.6 NOTE: MONITORING ANNULUS PUMPING ACROSS TOP PERIODICALLY -STABLE FLUID COLUMN. 0800 1800 10.00 DRILL N 12,970.00 PROD1 ECD AT 11.98 PPG, WORK PIPE -20K TO 70K, NO MOVEMENT. WAIT FOR ECD TO BLEED OFF. PUMP ACROSS TOP PERIODICALLY, MONITOR ANNULUS FLUID LEVEL. 18.00 23 15 5.25 DRILL N 12,970.00 PROD1 ECD AT 11.28 PPG. WAIT FOR ECD TO BLEED OFF. PUMP ACROSS TOP PERIODICALLY, MONITOR ANNULUS FLUID LEVEL. Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 10 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -------- - (hr) - (usft) 23:15 00:00 0.75 DRILL N 12,970.00 PROD1 WORK PIPE -ECD AT 11.0 START TO WORK PIPE BETWEEN NEUTRAL WIEGHT AND -25K LEAVING COIL IN COMPRESSION TO ATTEMPT TO FREE PIPE. 7/6/2019 00:00 09:00 9.00 DRILL N 12,970.00 PROD1 WORK PIPE -ECD AT 10.95 WORK PIPE BETWEEN +20K AND -25K LEAVING COIL IN COMPRESSION TO ATTEMPT TO FREE PIPE. WORKING PIPE EVERY 0.05 REDUCTION IN ECD TO PRESERVE COIL LIFE. 0900 12.00 3.00 DRILL N 12,970.00 PROD1 DISCUSS PLAN FORWARD WITH ODE AND WOS, ACTING WSUP. PJSM WITH CREWS FOR FREEING PIPE. ORIENT LOWSIDE. PULL 2 TIMES TO 75K, 80K. NO MOVEMENT. GO TO +20K WEIGHT AND OPEN DISCONNECT. CYCLE PIPE -20K TO 80 2 TIMES WITH OPEN DISCONNECT, NO MOVEMENT. CLOSE DISCONNECT. PUT -22K DOWN WEIGHTAND PRESSURE UP CT X TUBING ANNULUS. PUT 1000 PSI ON IT AND DUMP, SEE SMALL WEIGHT CHANGE. PUT 1500 PSI THEN 2400 PSI ON BACKSIDE THEN DUMP. REPEAT 35 TIMES. SAW SMALL INCREASE IN ANNULAR PRESSURE ON THE FIRST FEW DUMPS, THEN NOTHING. NO MOVEMENT. PULL TO 75KAND TRY PRESSURING ANNULUS TO 2400 PSI AND DUMPING. REPEAT 4 TIMES. ECD GOES TO 10.33 PPG WHEN PICKING UP. PUMP MIN RATE DOWN THE CT, NO RETURNS ECD GOES TO 11.73 PPG AND STAYS THERE. GO TO 52K WEIGHT AND WAIT FOR ELINE UNIT AND JET CUTTING TOOLS. 1200 0000 12.00 DRILL N 12,970.00 PROD1 WAIT FOR SLICKLINE AND ELINE UNIT. CONTINUE MONITOR FLUID LEVEL. NOTE: SLICK LINE CREWARRIVED ON LOCATION AT 2115 HRS, CHECKED INVENTORY AND RETURNED TO BASE FOR ADDITIONAL EQUIPMENT. 7/7/2019 00:00 01:30 1.50 FISH N 12,970.00 PROD1 RIG UP TO RECOVER STUCK PIPE -HOLD PRE JOB SAFETY MEETING WITH CREW -COME TO NEUTRAL STRING WEIGHT PLUS 10000-55K -CLOSE UPPER PIPE/SLIP RAMS AND CLOSE MANUALLOCKS -PERFORM PUSH PULL TEST TO 5K EACH -PRESSURE TEST TO 500 PSI. -CLOSE LOWER PIPE/SLIP RAMS -MONITOR ANNULUS THROUGH MANAGED PRESSURE DRILLING LINE. Printed 7/25/2019 9:34iOOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 11 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 01:30 06:00 4.50 FISH N 12,970.00 PROD1 RIG UP TO RECOVER STUCK PIPE -STRIP INJECTOR OFF WELL -INSTALL SLIPS AND DOG COLLAR ON COIL -OREINT MOTOR TO 30 DEGREES RIGHTAND OPEN EDC -POWER DOWN MWD TOOLS -INSTALL HOT TAP -TAP COIL AND LET MUD DRAIN FROM COIL. -CUT COIL -ATTACH ELINE CLAMPS AND PULL SLACK FROM COIL. 0600 0800 2.00 FISH N 12,970.00 PROD1 USE ONE LIFTING CLAMP AND 1 BACKUP CLAMP FOR EACH PULL. USING BLOCKS PULL ABOUT 50' OF CABLE EACH TIME. SEE SEVERAL 1-2K WEIGHT BOBBLES WHILE PICKING UP. PICK UP 8 TIMES. 0800 1230 4.50 FISH N 12,970.00 PROD1 CONDUCT PJSM WITH SLB AND NABORS CREW. RIG UP SHEAVES FOR CLEAR CABLE TRAVEL PATH DOWN TO SL UNIT. HOOK UP FREE CABLE END TO SL DRUM, SPOOL UP OLD ELINE CABLE ONTO SLICKLINE DRUM. PULL LAST 400' OUT BY HAND SO IT DOESN'T FALL THROUGH THE SHEAVE. 12:30 16:00 3.50 FISH N 12,970.00 PROD1 BRING OUT SHEAVES FOR SLICKLINE DRIFT RUN. RIG UP SLICKLINE WITH 1.70" DRIFT. ZERO DEPTH AT RIG FLOOR. RIH, CLEAN PASS. TAG CT CONNECTORAT 12306'. 1600 1730 1.50 FISH N 12,970.00 PROD1 POOH WITH SLICKLINE DRIFT. RIG DOWN SLICKLINE UNITAND MOVE OUT. 17:30 00:00 6.50 FISH N 12,970.00 PROD1 ELINE OPERATIONS -SPOT ELINE UNIT -HOLD PJSM -MOBILIZE ELINE TOOLS TO RIG FLOOR. -RIG DOWN NABORS QTS -RIG UP SLB PUMP IN SUB, QTS AND WIRELINE VALVES -RIG UP LUBRICATOR AND GREASE HEAD AND SHEAVES. 7/8/2019 0000 0300 3.00 FISH N 12,970.00 PROD1 RIG UP E LINE PRESSURE CONTROL EQUIPMENT -HOLD PJSM WITH ONCOMING RIG CREW. -STAB LUBRICATOR AND GREASE HEAD ONTO WIRE LINE VALVES -BREAK QTS TO ENSURE FOSV COULD BE OPENED PRIOR TO CUTTING COIL -MAKE UP QTS, AND FILL PCE FOR TESTING -DISCOVER LEAK AT LUBRICATOR TO GREASE HEAD CONNECTION. -RIG DOWN LUBRICATOR, GREASE HEAD AND WIRELINE VALVES -REPLACE ORING ON GREASE HEAD TO LUBRICATOR CONNECTION. Printed 7/25/2019 9:34:OOAM "All depths reported in Drillers Depths"' North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Page 12 of 35 Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 03 00 - 13:00 10.00 FISH N 12,970.00 PROD1 WAIT FOR ELINE CREW. CONTINUE MONITOR FLUID LEVEL. NOTE: ELINE CREW TIMED OUT, SEND BACK TO QUARTERS FOR REST PERIOD AT 0230 HOURS. WILL BE BACKAT NOON. FUNTION TEST BOPS: ANNULAR, VBR, AND BOTH HCRS. BOTH UPPER AND LOWER PIPE / SLIPS ALREADY FUNCTIONED CLOSED AND LOCKED. CAN'T FUNCTION BLINDS AT THIS TIME NOTE WAS SENT TO AOGCC 13:00 - 15:00 2.00 FISH N 12,970.00 PROD1 SLB ELINE CREW ARRIVES. PJSM WITH BOTH CREWS FOR TUBING PUNCH RUN. — — - RIG UP ELINE LUBRICATOR AND PCE. 15.00 1700 2.00 FISH N 12,970.00 PROD1 USE CHARGE PUMP THROUGH PUMP IN SUB TO FILL SLB RISER - LEAK TIGHT TEST OF ELINE RISER TO 500 PSI, GOOD. CLOSE TIW SO CT DOESN'T SEE ANY PRESSURE. BREAK OFF ELINE RISER AT QTS. REMOVE CT CONNECTOR FROM COIL STUB. ' M/U TUBING PUNCH BHA ON ELINE. 17 00 18:45 1.75 FISH N 12,970.00 PROD1 RIH WITH ELINE. TAG AT 12268' ELMD 1845 21:00 2.25 FISH N 12,970.00 PROD1 FIRE TUBING PUNCH PICK UP TO 12267' AND FIRE PUNCH PUNCH FROM 12263'-12261 NO CHANGE IN TUBING, IA OR OA PRESSURE POOH KEEPING HOLE FULL. AND MONITORING PRESSURES AT SURFACE MONITOR FOR FLOW FOR 10 MINUTES NO FLOW BREAK ELINE PRESSURE CONTROL EQUIPMENTAT QTS SUB RIG DOWN PUNCH TOOL SET PRESSURE CONTROL EQUIPMENT ON ODS OF RIG FLOOR 21:00 - 00:00 3.00 FISH N 12,970.00 PROD1 PREPARE TO CIRCULATE ON COIL TUBING HOLD PJSM WITH RIG CREW MAKE UP PUP JOINTS AND CROSSOVER MAKE UP EXTERNAL COIL TUBING CONNECTOR AND PULL TEST TO 40K. VERIFY ZERO PRESSURE PICK UP TO STRING WT TO 45 K CLOSEANNULAR OPEN LOWER SET OF PIPE/SLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS ATTEMPT TO CIRCULATE AT 0.25 BPM UNTIL PUMP PRESSURE REACHES 2500 PSI. -NO CIRCULATION NOTE: RELEASE E LINE CREWAT2300 HOURS WILL BE BACK AT 0700 HOURS NOTE: WHEN OPENING UPPER PIPE RAMS, STRING WT INDICATED 60K (WT INDICATOR 72K) Printed 7/25/2019 9:34:OOAM *'All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 13 of 35 Common Well Name: F-48 I AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 !X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations --— - -- (hr) (usft) - - 7/9/2019 00:00 03:00 3.00 FISH N 12,970.00 PR0D1 ATTEMPT TO CIRCULATE BRINGING PUMP RATE TO 0.25 BPM WITH A MAX PRESSURE OF 2500 PSI, OBSERVED A PRESSURE DROP AND RETURNS AFTER SITTING 15 MINUTES WITH PUMPS OFF AND HOLDING PRESSURE. BRING PUMPS UP GRADUALLY TO 3.3 BPM IN 3.3 BPM OUT AT 2190 PSI WITH DOWNSTREAM CHOKE PRESSURE AT 130 PSI. CIRCULATE SURFACE TO SURFACE TAKING RETURNS TO TIGER TANK. BRING RETURNS INSIDE AND CONTINE TO CIRCULATE UNTIL 2 BOTTOMS UP -RETURNS CLEAN UPON BRINGING TO PITS. FLOW CHECK FOR 10 MINUTES -STATIC_ 0300 0600 3 00 FISH N 12,970 00 PR0D1 WORK PIPE ATTEMPT TO FREE COIL LEFT IN HOLE 'REDUCE CLOSING PRESSURE ON ANNULAR TO 300 PSI PICK UP TO 75K STRING WEIGHT X 3 WITH NO MOVEMENT. BRING PUMPS UP TO 3.5 BPM AT 2000 PSI, WT INDICATOR AT 72K REDUCE CLOSING PRESSURE ON ANNULAR TO 300 PSI PICK UP TO 75K STRING WEIGHT X 3 WITH NO MOVEMENT BRING DOWN STRING WEIGHT TO 54K BRING PUMPS UP TO 2.3 BPM AT 1488 WORK PIPE BETWEEN 54K AND 75K. NO MOVEMENT 06 00 08:00 2.00 FISH N 12,970.00 PR0D1 CLOSE UPPER 2-3/8" PIPE / SLIP RAMS. TEST +/- 5K WEIGHT, GOOD. CLOSE LOWER 2-3/8" PIPE / SLIP RAMS. SLACK OFF BLOCKS ALL THE WAY. PT IN BETWEEN RAMS TO 500 PSI, GOOD. NSTALL TIW_VALVE. 08 00 0940 1.67 FISH N 12,970.00 PR0D1 WHILE WAITING FOR ELINE, LEAVE TIW OPEN TO MONITOR WELL. AFTER 30 MIN SMALL TRICKLE OF MUD IS SEEN COMING OVER THE TIW. SHUT IT AND INSTALL GAUGE, MONITOR AND RECORD RECORD PRESSURES AT THE CT AND THE MANAGED PRESSURE GAUGE BELOW THE LOWER PIPE / SLIP RAMS. NOTIFY WSUP. 0940 12.20 2.67 FISH N 12,970.00 PR0D1 DISCUSS WITH WSUP AND WOM. BLEED OFF 1/2 STYROFOAM CUP IN 10 MIN. PJSM WITH ELINE CREW. M/U ELINE BHA. TROUBLESHOOT COMS ISSUE WITH TOOL. 1220 1320 1 00 FISH N 12,970.00 PR0D1 REBUILD CABLE HEAD. 13:20 16:40 3.33 FISH N 12,970.00 PR0D1 M/U ELINE BHA FOR JET CUT CT. CUT OFF CT CONNECTOR, RUN CUTTER TOOL DOWN INSIDE CT. M/U ELINE BOPS TO WELL. RIH, LEAK TIGHT TEST RISER CONNECTION TO 500 PSI, GOOD. TIE-IN DEPTH. Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 Project: P B U Site: F AFE No X3-019CR-C: (2,778,074.00) Page 14 of 35 Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:40 - 17:00 0.33 FISH N 12,970.00 PROD1 REVIEW DEPTH TIE-IN AND CORRELATION WITH SLB ENGINEER. GET ON DEPTH AND CUT CT AT 12233'. MANAGED PRESSURE INCREASES FROM 96 TO 111 PSI WHEN CUT. CT PRESSURE UNCHANGED ABOUT 50 PSI. 17:00 - 19:00 2.00 FISH N 12,970.00 PROD1 POOH WITH JETCUT BHA ON ELINE 'PERFORM 10 MINUTE FLOW CHECKAT SURFACE GOOD. RIG DOWN CUTTING BHA BREAK DOWN SLB PRESSURE CONTROL EQUIPMENTAND MOVE TO OFF DRILLERS SIDE. 1900 21:00 2.00 FISH N 12,970.00 PROD1 PREPARE TO PICKUP COIL TUBING HOLD PJSM WITH RIG CREW MAKE UP PUP JOINTS AND CROSSOVER MAKE UP EXTERNAL COILTUBING CONNECTOR AND PULL TEST TO 40K. VERIFY ZERO PRESSURE PICK UP TO STRING WT TO 45 K CLOSE ANNULAR OPEN LOWER SET OF PIPE/SLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS PICK UP TO 62K STRING WEIGHT AND PICK COIL UP 5' SET IN SLIPS AND DOG COLLAR. MONITORING WELL PUMPING ACROSS TOP. 21 00 00.00 3.00 FISH N 12,970.00 PROD1 DEMOB SLB EQUIPMENT FROM RIG FLOOR. I PUT CHAINS BACK ON TUGGERS MONITORING WELL PUMPING ACROSS TOP. 7/10/2019 00:00 03:00 3.00 FISH N 12,970.00 PROD1 RIG UP TO PULL COIL HOLD PJSM WITH CREW CLOSE UPPER SET OF PIPE SLIP RAMS RUN IN MANUAL LOCKS, CLOSE LOWER SET OF PIPE SLIP RAMS AND PULL TEST TO 5K REMOVE EXTERNAL COIL CONNECTOR AND LIFT SUB INSTALL SPOOLABLE CONNECTOR UNABLE TO RELEASE HAND SLIPS MONITORING WELL WITH MPD LINE Printed 7/25/2019 9:34:o0AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 15 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 03 00 06:00 3.00 FISH N 12,970.00 PROD1 CUT OFF SP06LABLE CONNECTOR REINSTALL SPOOLABLE CONNECTOR ON COILAT INJECTOR INSTALL EXTERNAL COIL CONNECTORAND TEST TO 45K PICK UP TO STRING WT TO 45K CLOSEANNULAR OPEN LOWER SET OF PIPE/SLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS PICK UP STRING WT 50K AND REMOVE SLIPS CLOSE UPPER SET OF PIPE SLIP RAMS RUN IN MANUAL LOCKS, CLOSE LOWER SET OF PIPE SLIP RAMS AND PULL TEST TO 5K REMOVE EXTERNAL COIL CONNECTOR AND LIFT SUB DRESS CT STUB IN BOPS FOR INTERNAL DIMPLE CONNECTOR. MOVE CART OVER AND M/U DOUBLE ENDED CT SPOOLABLE CONNECTOR. 06:00 0830 2 50 FISH N 12,970.00 PROD1 PJSM FOR SPOOLING UP CUT CT. FOLLOW NABORS PROCEDURE TO STRIP DOWN OVER CTAND M/U RISER. PULL TEST CT CONNECTOR TO 60K. PRESSURE TEST TO 500 PSI FROM THE OUTSIDE THROUGH THE PUMP IN SUB. STRIP UP AND INSPECT CT CONNECTOR, GOOD. STRIP BACK DOWN AND ENGAGE TRACTION PRESSURE, GET 55K ON CT WITH INJECTOR. PT QTS, GOOD. OPEN LOWER AND UPPER PIPE/ SLIP RAMS. SPOOL UP CT CAREFULLY THROUGH THE STRIPPER, OVER THE GOOSENECKAND ONTO THE REEL. CIRCULATE ACROSS KILL LINE WHILE POOH. ESTABLISH EXCLUSION ZONE ON PIPE SHED, RIG FLOOR. 08 30 0930 1.00 FISH N 12,970.00 PROD1 WITH 6 WRAPS ON THE REEL, STOP AND INSPECT STRIPPER. CLOSE UPPER AND LOWER PIPE SLIP RAMS. PT IN BETWEEN RAMS TO 500 PSI, GOOD. OPEN STRIPPER AND INSPECT CT PACKOFF. PACKOFF IS GOOD, PUT IT BACK IN. PT PACKOFFS TO 500 PSI. FAIL 2 TIMES. REPLACE PACKOFF ELEMENT. PT IS GOOD. Printed 7/25/2019 9 34 LOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 16 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 09:30 13.00 3.50 FISH N 12,970.00 PROD1 CIRCULATE DOWN CT FOR POOH. CIRCULATE 0.79 / 0.58 BPM AT 1270 PSI. AROUND 1000 FT START GETTING LIGHT RETURNS BACK, STOP CT AND PUMP, OUT RATE GOES TO 0. SEND RETURNS OUT TO TIGER TANK FOR BOTTOMS UP, OUT DENSITY GOES BACK UP TO 8.5 PPG. GETTING 1:1 IN / OUT WHILE PUMPING OUT TO TIGER TANK, OUT DENSITY SOLID 8.56 PPG. PURGE CT RISER OUT TO TIGER TANK THEN FLOW CHECK FOR 15 MIN. SHOWING DIMINISHING TREND PAST 1.5 MIN TO FILLA 16 OZ CONTAINER. DISCUSS WITH WSUP, CONTINUE POOH TO 1300 1445 1.75 FISH N 12,970.00 PROW AT 500' OPEN CT RISER, WATCH FOR END OF PIPE. PULL END OF CT UP THROUGH RISER AND 'ATTACH CLAMP. CUT OFF END OF CT FOR INSPECTION. PREP TO PUMP FRESH WATER THROUGH REEL THEN PURGE. 'FUNCTION BLINDS. HES N2 ON LOCATION, PJSM TO RU, TEST LINE AND COOL DOWN PT PACKOFFS TO 250 LOW AND 3500 PSI HIGH - GOOD PT 14.45 0000 9.25 FISH N 12,970.00 PROD1 REEL BLOW DOWN & UNSTAB OPS - HOLD A PJSM WITH NABORS & HES CREW TO REVIEW PROCEDURES AND DISCUSS EXCLUSION ZONES PT N2 LINE TO 250 LOSW AND 4700 HIGH GOOD TEST, VERIFY VALVE LINE UP LINE UP N2 TO REEL, CONFIRMED RETURNS, INCREASE RATE TO 1800 SQFT/MIN FOR 11 MIN THEN SHUT DOWN BLEED OFF RESIDUAL PRESSURE TO ZERO PSI - OPEN LUBRICATOR TO TO VERIFY NO PRESSURE - NO PRESSURE, PU INJECTOR AND PREP COIL FOR GRAPPLE AND INSTALL - PJSM TO REVIEW PROCEDURE TO UNSTAB COIL - INSTALL GRAPPLE AND PULL TEST TO 2700 FT/LBS GOOD UNSTAB COILAND PULL TO REEL SECURE REELAND REMOVE REEL IRON OFF LOAD REEL ONTO TRUCK AND SECURE ON TRUCK LOAD NEW REELAND INSTALL SHIMS CHANGE OUT BRASS Printed 7125/2019 9.34 00AM ;`All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Page 17 of 35 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - - -- - - _ (hr) -T (usft) 7/11/2019 00:00 12:30 12.50 FISH N 12,970.00 PROD1 INSTALL REEL SHIM HUBS INSTALL SADDLE CLAMPS REPLACE BRASS IN INJECTOR PACKOFF REMOVE PACKING MATERIALS FROM REEL INSTALL DRIP PANS AND WEATHER STRIPPING CLEAN UP REELAREA CUT STRUT IN REEL TO ALLOW FOR INNER REEL IRON INSTALLING INNER REEL IRON AND PRESSURE BULKHEAD —FOUND ELINE INSIDE OF 3" NIPPLE BIRD NESTED FROM INJECTION. PULLED ELINE OUT AND HAD TO SPLICE THE WIRE FROM OUTSIDE OF THE BULKHEAD TO THE J -BOX.*** INSTALL GRAPPLE, PULL COILACROSS AND STAB, CUT OFF GRAPPLE AND MU THE CTC ***MEG TEST ELINE TO CONFIRM ELINE INTEGRITY*** -MEG TEST IS GOOD, MU CTC 12.30 16.30 4.00 FISH N 12,970.00 PROD1 ' REEL MANAGEMENT STAB ON AND DISPLACE COIL TO FRESH 'WATER PUMP SLACK OUT CYCLING PUMPS PUMPED OUT 365' OF 389' PULL PH6 OUT, BOOT WIRE, CHANGE PACKOFFS (PACKOFFS DAMAGED WHILE STABBING COIL) MU NOZZLE, STAB ON, PT THE PACKOFFS AND UPPER QTS GOOD TEST, PU THE INJECTOR AND MU BOT CTC AND PT TO 4700 PSI 16:30 20:15 3.75 FISH N 12,970.00 PROD1 MAKE UP BHAAND RIH GOOD TEST, MU THE MILLING BHA RIH WITH MILLING BHA -CHECK SADDLE CLAMPS AT 2500', 7500' AND 11800' - TAG AT 1_2210' WITH 5_K __ 20:15 21:45 1.50 FISH N 12,970.00 PROD1 DRESS OF TOP OF FISH - GET PARAMETERS PUMP 2.5 BPM IN / 2.5 BPM OUT 2090 PSI, UP WT 48K / DOWN WT 21K - MILL OVER TOP OF FISH WITH DRESS OFF MILLAT 2-3.5K, PUMP 2.5 BPM AT 1900 - OBSERVE PRESSURE INCREASE AND ADDITIONAL WT ON BIT AT 12228' -SUSPECT TOP OF FISH. MILL TO 12229' - PICK UP TO 12970' TURN PUMPS OFF AND DRY DRIFT 12229.4 WITH 5K DOWN FLOW CHECK STATIC PICK UP OFF FISH AND INCREASE PUMP RATE TO 3 BPM FOR 15 BBLS AND THEN POH AT 3 BPM. 21:45 0000 2.25 FISH N 12,970.00 PROD1 POOH 3.0 BPM IN / 2.5 BPM OUT T 2040 PSI 7/12/2019 00:00 0130 1.50 FISH N 12,970.00 PROD1 POOH 3.0 BPM IN / 2.5 BPM OUT 2040 PSI FLOW CHECK WELL FOR 10 MINUTES -STATIC Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths- North America - ALASKA - BP Page 18 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 01:30 - 03:30 2.00 FISH N 12,970.00 PROD1 BHA OPERATIONS --- -- 03:30 - 07:00 3.50 _T FISH N 07:00 - 12:00 5.00 FISH N -HOLD PJSM WITH CREW FOR BHA HANDLING -LAY DOWN DRESS OFF BHA -MAKE UP FISHING BHA NOTE: GOOD INDICATION OF BEING OVER FISH WITH BURN SHOE. 12,970.00 PROD1 FISHING OPERATIONS RIH 0.29 BPM IN / 0.72 BPM OUT 661 PSI NOTE: HELD KICK WHILE TRIPPING DRILL WITH MICAH BUSH'S CREW WITH AAR TIME TO SECURE WELL 85 SECONDS (SIMULATED) STOP AT 12175' AND GET WT'S, PU WT = 51 K RIH WT = 25K RIH AND TAG HIGH AT 12186', PU AND RIH TAG SAME DEPTH, BASED ON THE TALLIES WE ARE TAGGING BETWEEN THE PKR AT 12170 AND THE NIPPLE AT 12223 - PU 100' AND RUN BACK DOWN, PU IS CLEAN RIH. MADE IT DOWN TO 12193, LOOKS LIKE WE HAVE SOME JUNK BESIDE US AND WE ARE PUSHING IT DOWN, CALL WSUPT & WOS I TO DISCUSS OPS DECISION MADE TO POOH FOR A VENTURI JUNK BASKET TO CLEAN OUT DEBRIS TO TOP OF FISH 12,970.00 PROD1 POOH FOR VENTURI JUNK BASKET BHA FLOW CHECK WELL GOOD NO FLOW, POOH HOLDING 100 PSI WHP PUMPING ACROSS THE TOP, WE CANNOT PUMP DOWN THE COIL WITH THE GS SPEAR AS IT COULD RELEASE THE BAIT i SUB BLEED OFF WHIP AND FLOW CHECK WELL GOOD NO FLOW, PU INJECTOR AND STBK THE COLLARS - AFTER INSPECTING THE MULE SHOE ON THE BAIT SUB WE NOTICED THAT THERE ARE GOUGES ON THE INSIDE OF THE SHOE WITH A LARGE RADIUS INDICATING WE MIGHT HAVE BEEN TAGGING UP AT THE 4-1/2" TUBING STUMP AT 12161'. CALL WSUPT & WOS TO DISCUSS - PUMP 7/8" DRIFT BALL FOR DISCONNECT -BALL RECOVERED Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 19 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr)_ _ (usft) 12:00 17:00 5.00 H N 12,970.00 PROD1 FISHING OPS BASED ON THE MARKS INSIDE THE MULE SHOE WE ARE GOING TO REVERT BACK TO OCN #9 AND MU THE FISHING BHA WITH AN INDEXING SUB TO ORIENT THROUGH THE TUBING STUMP IF WE TAG WHEN GOING BACK IN HOLDA PJSM TO MU THE FISHING BHA MU BHA WITH INDEXING SUB RIH CREW CHANGE - DISCUSS WITH BEARDS CREW FISHING OPS AND POTENTIAL FOR TRAPPED PRESSURE UNDER THE RESTRICTION AND MONITOR RETURNS STOP AT 12150 AND GET WT'S, PU WT = 54K RIH WT = 24K RAN PAST 12193 CLEAN LAST DEPTH WE TAGGED AT 12235' START TAKING WT, SET DOWN 15K AT 12241.64' - PU TO 10K OVER UP WT T AND VERIFY WE ARE LATCHED ON TO THE FISH - PULLED TO 64K WE ARE LATCHED ON, RIH TO 10K SURFACE WT, SAME DEPTH SHOULD BE FULLY ENGAGED ON THE FISH - START WORKING JAR HITS GOING DOWN COIL LIFE AT 2.5% 14 JAR HITS, HOLD DOWN WT AND CIRC TO VERIFY WELL IS FULL AND COOL DOWN JARS 0.5 BPM AT 1032 PSI 20 JAR HITS GOING DOWN NOT SEEING MUCH CHANGE IN DEPTH - AS PER OCN, LINE UP DOWN THE BACKSIDE AND PRESSURE UP TO 2000 PSI 17:00 18:30 1.50 FISH N 12,970.00 PROD1 PRESSURED UP TO 2000 PSI AND GOT 15K BACK IN STRING WT, RIH AND WE CAN MOVE DOWN TAG AT 12282', PU AND WE ARE MOVING FREE BLEED OFF WHIP AND COME ONLINE WITH PUMP AT 0.3 BPM WE ARE SEEING HIGHER CIRC PRESSURE AND COULD BE CIRCULATING DEBRIS UP AROUND US CALL WSUPT AND DISCUSS NOT PUMPING AND POOH TO SEE IF WE CAN WSUPT AGREES, POOH PULLING HEAVY AT 12231' 11' ABOVE WHERE WE STARTED JARRING RIH FREE, PU AND WE ARE PULLING 10K OVER AT SAME DEPTH 4X RIH TO WHERE WE TAGGED AT 12282' AND RAN PAST CLEAN TO 12350' STOP AND CALL WSUPT & ETLAND DISCUSS DECISION MADE TO WORK FISH OOH WITHOUT PUMPING, IF WE ARE NOT MAKING PROGRESS CALL WSUPT AND DISCUSS SLIGHT BOBBLE AT 12131 BUT PULLED THROUGH CLEAN CONTINUE POOH SLOW UNTILTHE BHA IS IN THE TUBING Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 20 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) -MONITOR WELL PUMPING ACROSS TOP OF Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - (hr) - --- (usft) i WELLAT 0.5 BPM HOLDING 100 PSI WELL 18:30 - 23:00 4.50 FISH N 12,970.00 PROD1 POOH Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths** -POOH TO 12070' OBSERVE OVER PULLS 2-3K -MONITOR WELL PUMPING ACROSS TOP OF i WELLAT 0.5 BPM HOLDING 100 PSI WELL HEAD PRESSURE. -STOP AT 200' AND MONITOR WELL PRIOR TO HAVING BHA ACROSS BOPS FOR 15 MINUTES -STATIC 23:00 00:00 1.00 FISH N 12,970.00 PROD1 LAY DOWN BHA -HOLD PJSM WITH CREW FOR LAYING DOWN BHAAND FISH -LAY DOWN FISHING BHA 7/13/2019 00:00 - 01:30 1.50 FISH N 12,970.00 PROD1 LAY DOWN BHA -LAY DOWN FISHING BHA -LAY DOWN RECOVERED BHA#5 NOTE: FOUND 1/2"-3/4" PEICES OF SHALE ON TOP OF CTC ON RECOVERED BHA NOTE: NO DAMAGE FOUND ON EXTERIOR OF FISH (BHA#5) NOTE: BIT ON BHA 5 GRADED 1-1 01:30 0230 1.00 FISH N 12,970.00 PROD1 SERVICE INJECTOR PERFORM POST JARRING INSPECTION 02:30 03:15 075 FISH N 12,970.00 PROD1 MAKE UP BHA# 9 -HOLD PJSM WITH CREW -MAKE UP NOZZLE BHA -MAKE UP INJECTOR AND TEST QTS TO 3500 PSI 03:15 0630 3.25 FISH N 12,970.00 PROD1 RIH TREAT LOW VIS MUD WITH GEOVIS XT AND BDF976 WHILE RUNNING IN HOLE ON THE FLY 3.5 BPM IN / 4.0 BPM OUT AT 2300 PSI Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 21 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Daterrime: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations �h�)-- _. — (usft) 06:30 16:30 10.00 FISH N 12,480.00 PROD1 CLEAN OUT OPERATIONS STOP RIH TO LOAD LOW VIS ON RIG, BUILD HIGH VIS PILLS AND REVIEW THE WELLS GROUP FILL CLEAN OUT RP HOLD A PJSM WITH THE CREW PUMP A 10 BBL HI VIS PILL FOR THE TUBING BEFORE WE GET STARTED AS WE ARE SEEING SOME SHALE FROM RIH BOTTOMS UP FROM HVP IS CLEAN - RIH DRY TO TAG RIH WT = 21 K PU WT = 51 K NO PUMP ( WITH PUMPS PU WT = 46K) - DRIFTED TO 12250 BUT STARTED SEEING WT BOBBLES AT 12170', PU AND START CLEAN OUT FORM 12150' - START FILL CLEAN OUT FOLOWING THE WELLS GROUP RP, NO MORE THAN 1 BBL BITES BASED ON TUBING OR LINER ID CHASING EACH BITE TO THE TT WITH 5X10 LOW & HIGH VIS PILLS - HAVEN'T SEEN MUCH AS FAR AS LARGE CUTTINGS MOSTLY FINES FROM THE LAST PILLS FROM 12300'. CONTINUALLY WATCH STRING WEIGHTS UP AND DOWN TO SEE IF WE ARE LOADING UP THE LONG TANGENT SECTION TO 2100 HARD TAG AT 12480' (UNCORRECTED) -25' CORRECTION WOULD PUT US AT 12,455'. PUMP SUPER HIGH VIS PILLAND TRY RAMMING THE BRIDGE TO SEE IF WE CAN BREAKTHROUGH PILLS OUT CAN'T BREAK THROUGH BRIDGE, POOH PUMPING & CHASING PILLS FOR SMART BHA WITH MOTOR & MILL PUMP LOW & HIGH VIS PILLS IN TANGENT SECTION - NO SIGNIFICANT AMOUNT OF CUTTINGS FROM PILLS FLOW CHECKAT SURFACE GOOD NO FLOW LD BHA 1630 2330 7.00 FISH N 12,480.00 PROD1 REEL OPS PUMP SLACK INTO REEL, RU CUTTER AND CUT 316' OF COIL FOR 2% SLACK - PUMP SLACK FORWARD, MU CTC, PULL TEST TO 50K, PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH PUMP SLACK FORWARD DID NOT FIND ELINE AFTER PUMPING SLACK FORWARD, ATTEMPT AGAIN WITH NO LUCK PUMPING AT 4.6 BPM. - RIH WITH COIL 1 00'AND SURGE/PUMP AT 4.6 BPM - HEAD UP BHI PRESSURE TEST BHI CONNECTOR 3500 PSI PRESSURE TEST CHECKS TO 250/3500 PSI FOR 5 MINUTES EACH. 23:30 00:00 0.50 FISH N 12,480.00 PROD1 MAKE UP CLEAN OUT BHA# 10 7/14/2019 00:00 00:30 0.50 FISH N 12,480.00 PROD1 MAKEUP MILL/ CLEAN OUT BHA # 10 Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 22 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 00:30 05:30 5.00 FISH N 12,480.00 PROD1 RIH 1.06 BPM IN / 1.55 BPM OUT AT 1160 PSI -SET DOWN 10KAT 12180' UNCORRECTED, 12160" CORRECTED -SUSPECT 4.5" TUBING STUB PICK UP 20' WITH NO OVER PULL RBIH AND SET DOWN AT SAME SPOT WITH -7K DISCUSS WITH ODE, AGREE TO FIND A HIGHER TIE IN POINT AND THEN PUMP AT 0.5 BPM WITH ECD CLOSED AND ATTEMPT TO PASS THROUGH. CLOSE EDC TIE IN FROM 11984' TO 12104' CORRECTION -8- - RIH AT 0.5 BPM IN / 0.63 BPM OUT AT 1362 PSI -PASS THROUGH 12172' WITH NO ISSUES. - TIE IN TO BETTER MARKER FROM 12390' TO 12460' -12' (PUTTING SET DOWN AT 12180 UNCORRECTED AT 12160') RIH AND TAG AT 12480' PULL UP TO 12000' PERFORM CCL LOG START TO SEE LIGHT READINGS ON OUT MICROMOTION STOP PUMPING AND FLOW CHECK NO FLOW, RESTART PUMPS AND READINGS CONTINUE ERRATIC ON OUT MICROMOTION. FLOW CHECK AGAIN NO FLOW, SHUT IN CHOKE WHILE MAKING CALL TO SUPERINTENDENT AGREE TO CIRCULATE TO TIGER TANK TO SEE IF MICROMOTIONS STABILIZE,. MICROMOTIONS STABILIZED FOR 5 MINUTES, BROUGHT RETURNS BACK INSIDE AND STARTED TO SEE MICROMOTION FLUCTUATIONS ON RATE AND DENSITY, SHUT IN AND CALL WELL SUPERINTENDENT, AGREE TO PURGE LUBRICATOR WITH MUD TO TIGER TANKAND CIRCULATE BOTTOMS UP OUT TIGER TANK MONITORING OUT RATE AND DENSITY. 05:30 08:00 2.50 FISH N 12,480 00 PROD1 CIRCULATE BOTTOMS UP WELL KILL LUBRICATOR PURGED TO TT CIRCULATE BOTTOMS UP PICKING UP SLOWAND HOLD 100 PSI WHIP -RATES IN/OUT = 2.23 / 2.20 DENSITY IN / OUT = 8.55 / 8.45 OUT MM RATE & DENSITY HAVE BEEN STABLE BOTTOMS UP IS CLEAN, PURGE LUBRICATOR SHUT DOWN PUMP AND FLOW CHECK WELL GOOD NO FLOW, CALL WSUPT, ODE AND WOS - GOOD TO PROCEDE WITH CLEAN OUT DOWN TO 12,498' Printed 7/25/2019 934 OOAM "All depths reported in Drillers Depths— North America - ALASKA - BP Operation Summary Report Page 23 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 08:00 13:30 5.50 FISH N 12,498.00 PROD1 FILL CLEAN OUT - RIH TO 12480, SEE INCREASE IN MOTOR WORK, START LOW & HIGH VIS PILLS DOWN COIL - CLEAN OUT TO 12498' TO ENSURE WE HAVE RAT HOLE FOR THE NEXT WS RUN PUH SLOW WAITING FOR PILLS CHASE PILLS TO 12150 AT 80 % 100' IN TO THE 4-1/2" TUBING - PACKING OFF AT THE TT, REDUCE RATE AND RIH SLOW, BRING RATE UP AND PU SLOW TO THE TT START 1OX10 LOW & HIGH VIS PILLSAND RIH TO 12498' POOH CHASING PILLS TO 12150 RIH TO 12495, CIRCULATE A BOTTOMS UP SHUT DOWN PUMP, OPEN EDC AND FLOW CHECK WELL - POOH PUMPING AT MAX RATE PUMPING PILLS IN THE -4-1/2 TANGENT SECTION JOG IN HOLE 500', PUH TO 150' AND FLOW CHECK WELL GOOD NO FLOW, PU THE INJECTOR AND POOH INSPECTING THE COIL FOR FLAT SPOTS - LD BHA, BHA OOH 13.30 1730 4.00 BOPSUR P 12 498.00 PROD1 PREP FOR TESTING BOPE REMOVE DFCV AND CHANGE PACKOFFS SWAP OUT LUBRICATORS FOR TESTING STAB INJECTOR AND DISPLACE COIL & MPD LINE TO WATER LTT MASTER VALVE #1 AND SWAB - GOOD LTT LTT MASTER VALVE #2 AND SWAB - GOOD LTT - SHELL TEST - GOOD TEST, STAB INJECTOR TO START TESTING BOPE Printed 7/25/2019 9 34 00A .*All depths reported in Drillers Depths" North America - ALASKA - BP Page 24 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 17:30 00:00 6.50 BOPSUR P 12,498.00 PROD1 TEST BOPE TO BOTH BP / AOGCC REQUIREMENTS WITNESS WAIVED BY AOGCC JEFF JONES 7-1/16" ANNULAR, BLIND / SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" x 3.5" VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALL TESTS WILL BE 250 PSI LOW/ 3500 PSI HIGH HELD FOR 5 MIN EACH -TEST 1: IRV, PACKOFF, C9, C10 BACKWARDS - PASS TEST 2: BLIND / SHEAR, R1, BL1A, B1, B4 - PASS TEST 3: ANNULAR (2-3/8") TIW#1, B3, B2, BL1 PASS TEST 4: UPPER 2-3/8" PIPE -SLIP, TIW#2, BL2, R2, T2, C15 - PASS TEST 5: C16, T1, C11 - PASS TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 FAILURE TV 2 -GREASE AND RETEST AFTER MIDNIGHT PASS TEST 7: LOWER 2-3/8" PIPE -SLIP, C5, C6, C8, TV1 - PASS TEST 8: CHOKE A, CHOKE C - PASS -ACCUMULATOR DRAWDOWN TEST -PASS TEST 9: ANNULAR (3-1/2"), C1, C4 - PASS TEST 10: VARIABLES (3-1/2"), C2, C3 - PASS 7/15/2019 0000 0030 0.50 BOPSUR P 12,498.00 PROD1 TEST BOPE TO BOTH BP / AOGCC REQUIREMENTS WITNESS WAIVED BY AOGCC JEFF JONES GREASE AND RETEST TV2 WITH MASTER VALVE, T1, B1, B4, AND NIGHTCAP TO 250/3500 PSI FOR 5 MINUTES EACH -PASS 0030 04:00 3.50 BOPSUR P 12,498.00 PROD1 RIG DOWN FROM BOP TEST RIG DOWN TEST EQUIPMENT SWAP TEST LUBRICATOR FOR DRILLING LUBRICATOR. INSTALL CHECKS TEST DRILLING RISER AND CHECKS TO 250/3500 PSI FOR 5 MINUTES EACH - DISPLACE WATER IN SURFACE LINES AND COIL WITH QUICK DRILL N 04:00 05.00 1.00 STWHIP N 12,498.00 WEXIT MAKE UP WHIPSTOCK BHA#11 HOLD PJSM WITH CREW MAKE UP BHA TEST QTS TO 3500 PS( -GOOD Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 AFE No X3-019CR-C: (2,778,074,00) Page 25 of 35 Project. PBU — -- -_-- Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- - (hr) --- --- -- --- - (usft) - 05:00 16:00 11.00 STWHIP N 12,470.00 WEXIT RUN IN HOLE WITH WHIPSTOCK BHA#11 0.30 BPM IN / 0.75 BPM OUTAT 784 PSI NOTE: PUMP TRIPS SET AT 930 PER OCN # 13 —HOLD KWT DRILL WHILE RIH*** LOG TIE IN LOG DOES NOT LOOK LIKE ANYTHING WE HAVE LOGGED BEFORE, PU TO 12300' AND RELOG - CORRECT DEPTH -21', SWAP TOOL OVER TO CCL AND LOG CCL FROM 12300 TO 12490 - WE ARE ON DEPTH WITH THE CCL LOG FROM THE OCN, SEND CCL LOGS TO ODE ODE AGREES WE ARE ON DEPTH, RIH TO 12493' AND GET UP WT WITH NO PUMP RIH TO 12493, PU TO 5K LESS THAN UP WT AND STOP TAG AT 12490', PU AND TAG AT SAME DEPTH, 3' HIGHER THAN PLAN PLACING THE 7" COLLAR 2' INTO OUR WINDOW, CALL ODE - DECISION MADE TO SET WS HIGHER WITH THE 7' COLLAR BELOW THE BOTTOM OF THE WINDOW WO OCN TO SET THE TOWS AT 12465' RECEIVE LEVEL 1 OCN, REPLY AND SET WS AS PER OCN #14 RIH TO 12483 (TOWS AT 12465'), PU WT = 54K, RIH TO 12483, PU TO 49K AND STOP. CLOSE EDC AND SET WS WS SET AT 3600 PSI, SET DOWN 1 K, WS IS SET, PU OFF WS AND OPEN EDC ONLINE WITH KCLAT MAX RATE POOH DISPLACING TO KCL STOP AT 12130.10' FOR A 12050.0' EOP FLAG THEN POOH - FLOW CHECK WELL ***REVIEW - GOOD NO FLOW, TAG UP AND LD THE WS RUNNING TOOLS TOOLS LD AND INSPECTED 1600 21 15 5.25 STWHIP N 12,470.00 WEXIT CEMENTING OPERATIONS REMOVE BHI FLOATS FROM UQC MU NOZZLE BHA WITH 1 JT OF PH6 RIH WITH CMT BHA CORRECT AT FLAG AT 12130 CORRECTION' -30' - UP WT 50K / DOWN WT 24K TAG PINCH POINT AT 12473' PICK UP 10' OFF WHIPSTOCKAND PAINT FLAG Printed 7/25/2019 9:34:OOAM *`All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 26 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - -- -------- - - (hr) - - -- (usft)- — - 2115 00:00 2.75 STWHIP N 12,470.00 WEXIT CEMENT WHIPSTOCK PRESSURE TEST SLB TO CUSTOMER VALVE TO 250/4000 PSI. PERFORM INJECTION TEST 1 BPM WITH CHOKE OPEN 1.03 BPM IN 10.99 OUT AT 281 PSI CLOSE CHOKE PUMP 1 BPM AT 1360 PSI. HOLD PJSM WITH CREWS BATCH UP 19 BBLS OF 15.8 PPG CEMENT SET ELECTRONIC TRIP AT 2500 PSI ON CEMENT UNIT AND TEST SAME GOOD. VERIFY MECHANICAL TRIP SET AT 4950 PSI - RUN INTO PINCH POINT AT 12473' PICK UP TO TOWS AT 12465' - PUMP 10 BBLS OF CEMENT AT 2 BPM AT 1000 PSI - TAKE OVER WITH RIG AND PUMP 5 BBLS OF KCL AT 1 BPM AT 600 PSI. FLUSH LINES TO CEMENT UNIT WITH CONTAM PILL PUMP 54.5 BBLS OF POWERVIS CONTAM PILL (CEMENT 1 BBL OUT OF NOZZLE) AT 2 BPM 800-950 PSI (AT 55 BBLS OF TOTAL DISPLACEMENT SLOW PUMP TO 1 BPM. - PUMPING AT 1 BPM POOH LAYING IN CEMENT 1 FOR 1 PULL UP HOLE TO 11836' LOSE 0.5 BBLS FROM TIME CEMENT WAS OUT NOZZLE UNTIL CHOKE CLOSED AT 11836' - BULL HEAD AT 1 BPM REACHING 2000 PSI AT 1.5 BBLS AWAY, DISCUSS WITH ODE, SLOW PUMPS TO 0.1-0.2 BPM AND MAINTAIN PRESSURE AT 2000 PSI UNTIL BBLS ARE i BULLHEADED. BLEED OF CHOKE PRESSURE TO ZERO PUMPAT4 BPM IN /4 BPM OUTAT2860 PSI AND WASH DOWN FROM 11836' TO 12460' THREE TIMES. 7/16/2019 00:00 01:15 1.25 STWHIP N 12,498.00 WEXIT CEMENT WHIPSTOCK - PUMPAT4 BPM IN /4 BPM OUTAT2860 PSI AND WASH DOWN FROM 11 836'TO 12460' THREE TIMES. 01.15 04:15 3.00 STWHIP N 12,470.00 WEXIT POOH -PUMP AT 4.24 BPM IN/ 4.0 BPM OUT AT 2482 PSI. - SLOW DOWN AT JEWELRY TO ENSURE GOOD FLUSHING - MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING NON SHEARABLES INTO THE BOPS.. 04:15 06.00 1.75 STWHIP N 12,470.00 WEXIT BHA OPERATIONS HOLD PJSM WITH CREW. BREAK INJECTOR. INSPECT LAST 50' OF COIL. LAY DOWN CEMENTING BHA.. INSTALL FLOATS IN UCC. MADE UP NOZZLE AND MAKE UP LUBRICATOR. TEST FLOATS TO 3500 PSI -GOOD JET STACK AT 4 BPM PU INJECTOR AND LD NOZZLE Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 27 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase i Description of Operations - (hr) - (usft) - - 06:00 11:30 5.50 STWHIP N 121470.00 WEXIT WINDOW MILLING OPS PJSM TO MU THE MILLING BHA MU THE BHA WITH 0.6° BENT MOTOR BHA RAN, SOMETHING IS WRONG WITH THE INJECTOR HOLD KICK WHILE MU BHA DRILL PU THE SAFETY JOING AND DEPLOY THE NOWSHEARABLE BHA BELOW THE BOP'S ***WELL SECURED WITH SAFETY JOINT IN 7:47 ALL HANDS CALLED IN FROM THEIR STATIONS IN 8:05*** - INJECTOR DIAGNOSIS IS OK, LD SAFETY JOINT AND MU THE INJECTOR RIH WITH MILLING BHA 12400 LOG TIE IN CORRECT DEPTH -19' CLOSE EDC, BRING PUMPS UP TO RATE AND GET WT'S AT 2.9 BPM, UP WT = 50K RIH WT = 21 K CIRC PSI = 2080 PSI - WASH DOWN LOOKING FOR CMT FROM '12460 TO 12470', OCN REQUIRED 50 PSI COMPRESSIVE STRENGTH 11 30 14:30 3.00 STWHIP N 12,470.00 WEXIT WINDOW MILLING OPS TAG PINCH POINT AT 12469.68' WITH KCL PU CHASING GREEN CMT TO THE TUBING TAIL, OPEN EDC TO DISPLACE COIL & WELL TO MUD TAKING RETURNS TO THE TIGER i TANK BOTTOMS UP BRING RETURNS INSIDE GET PARAMETERS ASTART MILLING THE WINDOWAS PER PLAN & BOT TAG PINCH POINT AT 12470.3 (SWAPPED OVER TO MUD) 14.30 0000 9.50 STWHIP N i 12,475.00 WEXIT MILL WINDOW FOR 12470.4 TO 12475.4 - IN RATE = 3.02 BPM OUT RATE = 2.06 BPM CIRC PRESSURE = 2650 PSI WOB = 1.7 - 3.4 K 7/17/2019 0000 01:45 1.75 STWHIP N 12,476.30 WEXIT MILL WINDOW FROM 12475.4 TO 12476.3 IN RATE = 2.92 BPM OUT RATE = 2.96 BPM CIRC PRESSURE = 2863 PSI WOB = 3 - 3.5K 01:45 0500 3.25 STWHIP N 12,487.00 WEXIT MILL RAT HOLE FROM 12476.3' TO 12487' IN RATE = 2.92 BPM OUT RATE = 2.96 BPM CIRC PRESSURE = 2863 PSI WOB = 1.3 - 3.8K TIME MILL FIRST FOOT AT V PER HOUR PUMP 10 X 10 BBL HI/LO VIS SWEEP REAM AT 0* TOOL FACE -CLEAN REAM AT 15° RIGHT TOOL FACE -CLEAN REAM AT 15° LEFT TOOL FACE -CLEAN DRY DRIFT WINDOW -CLEAN 05:00 10:00 5.00 STWHIP N 12,487.00 WEXIT POOH WITH WINDOW MILLING BHA OPEN EDC DYNAMIC FLOW CHECKAT 0.25 BPM IN / 0.25 BPM OUT GOOD - PUMP AT 4.04 BPM IN / 3.63 BPM OUT AT 3129 PSI - PAINT WHITE FLAG AT 12437.32 BIT DEPTH / 12298.9' EOP DEPTH FLOW CHECK AT SURFACE GOOD NO FLOW, LD THE BHA MILLS GAUGED WINDOW = 3.76 GO 3.75 NO GO STRING 3.80 GO 3.79 NO GO Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 28 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 13:30 3.50 DRILL N 12,487.00 PROD1 DRILL BUILD SECTION MU BUILD BHA WITH 2.86° MOTOR AND HYC DURAFORCE XD BIT RIH SLOWING DOWN FOR ALL JEWELRY AND PROFILES, BHA WAS TIGHT LOWERING IN THE WELL TIE IN FROM 12340' (CORRECT -22) 12450 - FINGERPRINT @ 3 BPM 50 SEC WITH .87 BBLS RETURNED CLOSE EDC RUN IN THE HOLE AND TAG 12487' FREE SPIN: 3100 PSI, 2.95 BPM RATE: 2.95 BPM IN, 2.95 BPM OUT. CIRC PRESSURE: 3200 - 3420 PSI - MUD WEIGHT: 8.58 PPG IN, 8.45 PPG OUT, ECD: 9.94 PPG AT WINDOW ROP: 30 - 60 FT/HR, WOB: 1.5 - 3.0 KLBS._ 13:30 1830 5.00 DRILL N 12,584.00 PROD1 DRILL 4-1/4" BUILD FROM 12,487' MD TO �I 12583' MD PU 49k SO 21 k FREE SPIN: 3100 PSI, 2.95 BPM RATE: 2.95 BPM IN, 2.95 BPM OUT. CIRC 'PRESSURE: 3200 - 3420 PSI MUD WEIGHT: 8.58 PPG IN, 8.45 PPG OUT, ECD: 9.94 PPG AT WINDOW ROP: 15 - 90 FT/HR, WOB: 1.5 - 3.0 KLBS. SETTING DOWN EARLY ACOUPLE TIMES. _I PUAND VERIFY TIE IN/COUNTERS 18:30 19:00 0.50 DRILL N 12,584.00 PROD1 PERFORM SHORT WIPER TRIP TO WINDOW RATE: 2.85 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900 PSI OPEN EDC, BRING UP TO MAX RATE. CHASE TO TUBING TAIL. PUMP BOTTOMS UP. NO CHANGE. LOG DOWN FOR TIE-IN (FORMATION) WITH +4' CORRECTION CLOSE EDC. LOG ACROSS RA TAG. RA TAG AT 12476' 19:00 00:00 5.00 DRILL N 12,677.00 PROD1 DRILL 4-1/4" BUILD FROM 12,584' TO 12677' FREE SPIN: 2943 PSI, 2.82 BPM RATE: 2.82 BPM IN, 2.84 BPM OUT. CIRC PRESSURE: 2943 - 3171 PSI MUD WEIGHT: 8.61 PPG IN, 8.47 PPG OUT, ECD: 10.08 PPG AT WINDOW ROP: 14 FT/HR, WOB: 2.0 - 2.7 KLBS CLEAN PICKUPS 7/18/2019 00:00 12:15 12.25 DRILL N 12,970.00 PROD1 DRILL 4-1/4" BUILD FROM 12677' MD TO 12970' FREE SPIN: 2981 PSI, 2.84 BPM RATE: 2.84 BPM IN, 2.86 BPM OUT. CIRC PRESSURE: 2981 - 3120 PSI MUD WEIGHT: 8.60 PPG IN, 8.48 PPG OUT, ECD: 10.1 PPG ROP: 10-90 FT/HR, WOB: 2.5-3.5 KLBS PULL TO WINDOW TO JET TRAYAND 7" AND CHASE TO TUBING TAIL. PULL 150' WIPER @ 12830' (NO ISSUES) CONT DRILLING BUILD SECTION (TOP OF SHUBLIK 12785') Printed 7/25/2019 9 34 OOAM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 29 of 35 Common Well Name: F-48 FREE SPIN: 2981 PSI, 2.84 BPM AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F ROP: 30-90 FT/HR, WOB: 2.5 - 3.5 KLBS Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. POH TO THE WINDOW BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) FREE SPIN 3360 PSI Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) TO 12570', POH TO 12450' usft OPEN EDC WHILE MAINTAINING 10.1 ECD AT --- . - - -- 12:15 - 12:30 0.25 -- DRILL P 13,000.00 PROD1 _ DRILL 4-1/4" BUILD FROM 12970' MD TO 13000' RIH @ 5 FPM, RATE BPM 3.75 IN 3.72 OUT, (SECTION TD) 12:30 - 18:00 5.50 DRILL 18.00 - 2230 4.50 DRILL 22:30 - 00:00 1.50 7/19/2019 00:00 - 01:30 1.50 DRILL DRILL Printed 7/25/2019 9:34:o0AM **All depths reported in Drillers Depths" FREE SPIN: 2981 PSI, 2.84 BPM RATE: 2.84 BPM IN, 2.86 BPM OUT. CIRC PRESSURE: 2981 - 3120 PSI - MUD WEIGHT: 8.60 PPG IN, 8.48 PPG OUT, ECD: 10.1 PPG ROP: 30-90 FT/HR, WOB: 2.5 - 3.5 KLBS PUMP 5X10 LOW/HI VIS SWEEP P 13,000.00 PROD1 POH FOR LATERAL BHA POH TO THE WINDOW RATE BPM IN 3.09 OUT 3.01 FREE SPIN 3360 PSI ATTEMPT TO PACK OFF @ 12648', STOP 'PUMPS AND PULLED THROUGH TIGHT SPOT TO 12570', POH TO 12450' OPEN EDC WHILE MAINTAINING 10.1 ECD AT THE WINDOW PUMP 10 BBLS HI VIS SWEEP RIH @ 5 FPM, RATE BPM 3.75 IN 3.72 OUT, 'TAGGED @ 12473' POH TO SURFACE CHASING CUTTINGS OUT OF THE HOLE, RATE 4.19 IN 3.73 OUT ECD 10.55 POH TO 500', JOG BACK IN THE HOLE TO 1000', POH TO SURFACE P 13,000.0 ROD1 RUN BACK IN HOLE WITH 4-1/4" DRILLING BHA #13 RATE: 4.05 BPM IN, 4.55 BPM OUT. CIRC PRESSURE: 3616 PSI MUD WEIGHT: 8.65 PPG IN, 8.51 PPG OUT SAT DOWN IN BOTH X NIPPLES. DROPPED THROUGH ONE AT 12,045' AND HAD UTILIZE HOT TO ROLL THROUGH ONE AT 12090 - LOG DOWN FOR TIE-IN FROM 12,380' TO 12485.97' MD (FORMATION) WITH -25' CORRECTION TRAP PRESSURE. CLOSE EDC. MADE ATTEMPT TO GET THROUGH WINDOW DRY. 12,476' MADE ATTEMPT AT MIN RATE. SAME DEPTH. - MADE ATTEMPT WITH 3K DOWN AND ATTTEMPTING TO ORIENT. - DISCUSSION WITH ODE AND ACTING WSUPT DAVE NEWLON. DECISION TO PULL FOR WINDOW DRESSING BHA. -OPEN EDC, PERFORM 10 MIN DYNAMIC FLOW CHECK WHILE MAINTAINING 10.2 PPG AT WINDOW. WELL STATIC N 13,000.00 PROD1 POOH MUD WEIGHT: 8.64 PPG IN, 8.49 PPG OUT RATE: 3.74 BPM IN, 3.30 BPM OUT N 13,000.00 PROD1 POOH MUD WEIGHT: 8.64 PPG IN, 8.49 PPG OUT RATE: 3.74 BPM IN, 3.30 BPM OUT AT 500' START SLOWLY TAKING CHOKE PRESSURE OFF WELL Printed 7/25/2019 9:34:o0AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 30 of 35 Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) — — — 01:30 - 02:30 1.00 DRILL N - 13,000.00 PROD1 PERFORM 10 MIN FLOW CHECK. WELL STATIC - INJECTOR OFF 01:40 -PULL BHA OUT OF WELL. SWAP MOTORS MAKE UP WINDOW DRESSING BHA INJECTOR ON: 02:25 PT QTS FOR 3500# FOR 5 MIN. GOOD TEST 02.30 04:30 2.00 DRILL N 13,000.00 j PROD1 RIH MUD WEIGHT: 8.59 PPG IN, 8.52 PPG OUT RATE: 1.02 BPM IN, 1.45 BPM OUT. INCREASE CHOKE PRESSURE TO MAINTAIN 10.0 PPG AT WINDOW - LOG DOWN FOR TIE-IN (FORMATION) WITH -28' CORRECTION CLOSE EDC DRY TAG AT 12477'. 04:30 08:00 350 DRILL N 13,000.00 PROD1 WORK MILLACROSS WINDOW RATE BPM IN 2.49 OUT 2.50 WORK MILLACROSS WINDOWAREA WITH NO ISSUES BACKREAM 3 PASSES (TF 180, 30 RHS, 30 LHS) OBSERVED 50-75 PSI DIFF @ 12471, 12475 & 12477 WHILE BACKREAMING WITH TF AT 180 78 PSI DIFF WHILE REAMING DOWN @ 12485', CONT PAST WITHOUT ISSUE - 60 PSI DIFF WITH 30 LHS @ 12482' & 12475' WHILE BACKREAMING 50 PSI @30 RHS @12482' PU 51 SO 21 DRY DRIFT WINDOW FROM 12455' TO 12497' (TAG@ 12497' - 8' BELOW ORIGINAL RATHOLE) OPEN EDC 08.00 11:00 3.00 DRILL N 13,000.00 1 PROD1 POOH TO 108' 1 PUMP 5X5 HI/LO SWEEP CHASE SWEEP OUT OUT THE HOLE RATE BPM IN 4.05 OUT 3.61 3500 PSI 11:00 - 12:00 1.00 1200 - 17:00 5.00 17:00 - 21:00 4.00 Printed 7/25/2019 9:34 OOAM DRILL N 13 000.00 PROD1 PERFORM 10 MIN FLOW CHECK. WELL DRILL DRILL STATIC PJSM INJECTOR OFF: 11:15 PULL WINDOW DRESSING BHA OUT OF WELL AND LD N 13,000.00 PROD1 REEL OPS CUT 15' OF COIL DUE TO GOUGING REHEAD COIL PULL TEST TO 50K, PRESSURE TEST TO 4300 PSI - BAKER REHEAD UQC - PRESSURE TESTED BODY (4200) AND DUAL FLOATS (3500) CHANGE RACKOFF PRESSURE TEST RACK_OFF TO 3500 PSI N 13,000.00 PROD1 RIH WITH LATERAL BHA MU LATERAL BHA INJECTOR ON: 17:30 PT QTS FOR 3500# FOR 5 MIN. GOOD TEST RIH WITH LATERAL BHA LOG DOWN FOR TIE-IN (FORMATION) WITH -28' CORRECTION "All depths reported in Drillers Depths" North America - ALASKA - BP Page 31 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USAD0000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:00 23:00 2.00 DRILL N 13,000.00 PROD1 CLOSE EDC. DRY DRIFTED TO 12497' TAGGED SOLID PU AND ESTABLISH PARAMETERS 2.80 BPM @ 3656#. WASH DOWN TO 12525'. MINIMAL MOTOR WORK AND NO INDICATION OF WOB REACTION. CHASE TO WINDOW. DROP RATE COME THROUGH WINDOW. OPEN EDC. CHASE TO TUBING TAIL. - RIH THROUGH WINDOW. RUN DOWN TO 12514'. SET DOWN. COME ONLINE AT 1 BPM. WENT BY. RIH TO 12600'. NEVER SEEANY WOB REACTION OR MOTOR WORK PUMPED 10 BBLS OF HIVIS. CHASE UP TO WINDOW. SLOW RATE TO MINIMUM. PULL THROUGH WINDOW WITHOUT ISSUE 23:00 00:00 1.00 DRILL N 13,000.00 PROD1 OPEN EDC JET TRAY. SET DOWN AT 12514'. FALL BY JET TRAY WITH EDC DOWN TO BOTTOM OF WINDOW 12544' JET FROM BOTTOM OF WINDOW AT 10 FPM 4.27 BPM IN RATE / 4.26 BPM OUT RATE. 8.67 PPG IN / 8.50 PPG OUT 7/20/2019 00:00 01:00 1.00 DRILL N 13,000.00 PROD1 FINISH WIPER AND PUMPING BOTTOMS UP CLOSE EDC ABOVE WINDOW. RUN THROUGH WINDOW DRY DOWN 12623' -COME ONLINE AT 1.0 BPM. DROP BYAND SET DOWN AGAIN AT 12630' PU AND START BRINGING UP TO DRILLING RATE. RIH TO 12650' 01.00 01:30 0.50 DRILL N 13,000.00 PROD1 START PICKING UPAT 10 FPM. START PULLING -4 ON WOB. MOTOR STALLING AND LOSING SOME RETURNS. WORK UP AND DOWN BETWEEN 12645 AND 12612. HAVING TO VERY PUMP RATE AND WORK UP AND DOWN TO KEEP MOTOR FROMSTALLING. PULL CLEANLY AT -12580'. CIRCULATE AT 2.80 BPM IN / 2.80 BPM OUT UP TO BELOW WINDOW. DROP RATE TO 0.5 BPM. NO ISSUES 01:30 04:00 2.50 DRILL N 13,000.00 PROD1 WIPER UP TO TUBING TAIL. PUMP HIVIS SWEEP UP. RIH TO ABOVE WINDOW. CLOSE EDC. ATTEMPT TO GET THROUGH WINDOW. SET DOWN AT 12475' TWICE. PU WEIGHT INCREASING AS WE PICK UP THE HOLE. - COME ONLINE AT DRILLING RATE AS WE PULL UP CLOSE TO TUBING TAIL WEIGHTS LOOKED BETTER. - OPEN EDC. ATTEMPT TO SET ON WINDOW WHILE CIRCULATING THROUGH EDC. -ORIENT HOT 90° LOHS AND 90° ROHS. NO CHANGE - WIPER TO TUBING TAIL. CALLAND DISCUSS OPTIONS WITH ODE AND WSUPT Printed 7/25/2019 9 34 00AM **All depths reported in Drillers Depths** Printed 7/25/2019 9 34.00AM **All depths reported in Drillers Depths— North America - ALASKA - BP Page 32 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 I End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR-2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr)-- — -- - - (usft) 04:00 05:00 1.00 DRILL N 13,000.00 PROD1 CLOSE EDC. BRING PUMP ONLINE AT 0.5 BPM. SLOWLY RUN IN HOLE. MONITORING DIFFERENTIAL ON MOTOR IN AN ATTEMPT TO GET THROUGH WINDOW. NO LUCK. STACKED UP TO 4K. PICKUP AND PUMP 10 BBLS OF 9.8 PPG HIVIS SWEEP - CLOSE EDC. BRING MOTOR UP TO DRILLING RATE. PUMP WEIGHTED SWEEP OUT FROM 12460' AND WIPER TO TUBING TAIL. MAINTAINING HIGH SIDE ORIENTATION. PERFORM A JOG AT TUBING TAIL. PERFORM DYNAMIC FLOW CHECK. 1:1. WEIGHTED SWEEP DID NOT BRING _ ANYTHING SUBSTANTIAL BACK. 05.00 0800 3.00 DRILL N 13,000.00 PROD1 POOH MUD WEIGHT: 8.64 PPG IN, 8.49 PPG OUT RATE: 3.74 BPM IN, 3.30 BPM OUT AT 500' START SLOWLY TAKING CHOKE 'PRESSURE OFF WELL 08:00 09:30 1.50 DRILL N 13,000.00 PROD1 PERFORM 10 MIN FLOW CHECK. WELL STATIC PJSM INJECTOR OFF: 08:41 PULL LATERAL BHA OUT OF WELLAND LD 09:30 - 10:00 0.50 DRILL N 13,000.00 PROD1 FUNCTION BOP's FUNCTION BSR INSTALL TEST JOINT FUNCTION BOP'S REMOVE TEST JOINT CLEAN DOWN TO SWAB WITH VAC 10:00 - 13:00 3.00 DRILL N 13,000.00 PROD1 MAKE UP VENTURI BHA i MAKE UP VENTURI BHA HELD ASAFETY DISCUSSION WITH CREW DUE TO HIGH WINDS WHILE MAKING UP BHA INJECTOR ON 12:44 _ PRESSURE TEST QTS 3500 PSI 13:00 - 1600 3.00 DRILL N 13,000.00 PROD1 RIH WITH VENTURI BHA to 12452' OPEN EDC RATE BPM .93 IN 1.20 OUT TIE IN @ 12350 (- 29 CORRECTED) Printed 7/25/2019 9 34.00AM **All depths reported in Drillers Depths— North America - ALASKA - BP Operation Summary Report Page 33 of 35 Common Well Name F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date. 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DatelTime: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. I BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (Usft) 16:00 18:00 2.00 DRILL N 13,000.00 PROD1 WORK VENTURIN ACROSS WINDOW CLOSE EDC RATE BPM IN 2.24 OUT 2.25 PU 46 SO 20 -WORK VENTURI FROM 12453' TO 12468' (TAG WITH 6K) - CLEAN PU ROTATE VENTURI 90 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12464' TO 12477' (TAG WITH 5K) - CLEAN PU - ROTATE VENTURI 90 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12469' TO 12477' (TAG WITH 4K) - CLEAN PU PU TO BREAK OVER AND LOW VENTURI TO 12477' (TAG WITH 4K) - CLEAN PU ROTATE VENTURI 90 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12472' TO 12477' (TAG WITH 4K) - CLEAN PU PU TO 12460' -WORK VENTURI FROM 12460' TO 12467' (TAG WITH 4K) - CLEAN PU - ROTATE VENTURI 180 DEG TOWARD THE RIGHT - WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU - ROTATE VENTURI 45 DEG TOWARD THE RIGHT - WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU PU TO 12457' ROTATE VENTURI 90 DEG TOWARD THE RIGHT - WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU - ROTATE VENTURI 45 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU - ROTATE VENTURI 45 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU ROTATE VENTURI 45 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU DYNAMIC FLOW CHECK - STATIC STOP PUMPS -WORK VENTURI FROM 12460' TO 12468' (TAG WITH 4K) - CLEAN PU BRING PUMPS BACK ONLINE ROTATE VENTURI 45 DEG TOWARD THE RIGHT -WORK VENTURI FROM 12457' TO 12468' (TAG WITH 4K) - CLEAN PU - PU TO 12440' -WORK VENTURI FROM 12440' TO 12468' (TAG WITH 4K) - CLEAN PU - ROTATE VENTURI 45 DEG TOWARD THE RIGHT Printed 7/25/2019 9.34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 34 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) Printed 7/25/2019 9*34:OOAM **All depths reported in Drillers Depths`* -WORK VENTURI FROM 12440' TO 12468' (TAG WITH 4K) - CLEAN PU - LEAVE 2K DOWN AND ROTATE VENTURI, PU TO 12455' - ROTATE TOOL COMPLETE ROUND TO THE LEFT - LOWER VENTURI TO SET DOWN 2K @ 12467' - ROTATE VENTURI TO THE RIGHT- NO SUCCESS PU TO 12411' RIH @ 30 FPM TO 12467' (TAG WITH 4K) - CLEAN PU - 18:00 22:00 4.00 DRILL N 13,000.00 PROD1 POOH WITH VENTURI 2.25 BPM RATE IN / 1.87 BPM OUT 8.68 PPG IN /8.52 PPG START WORKING WELL OFF CHOKE AT 1000' STOP AT 100'. PERFORM 10 MIN FLOW CHECK. WELL STATIC - EMPTY VENTURI. SCREEN PACKED OFF WITH SHALE AND ABOUT 1/2 GALLON IN LOWER SECTION OF BARREL. 22:00 23:00 1.00 DRILL N 13,000.00 PROD1 DISCUSSIONS WITH TOWN TEAM DEVELOP PLAN FORWARD. OCN #20 SUSPEND OPERATIONS. 23:00 00:00 1.00 DRILL N 13,000.00 PROD1 MAKE UP AND RUN IN HOLE WITH NOZZLE BHA#18 -INJECTOR ON: 23:35 1.04 BPM IN RATE / 1.56 BPM OUT RATE 8.60 PPG IN / 8.53 PPG OUT 7/21/2019 00:00 02:30 2.50 DRILL N 13,000.00 PROD1 RIH (CONT'D) 1.03 BPM IN RATE / 1.40 BPM OUT RATE 8.62 PPG IN / 8.52 PPG OUT 02:30 03:00 0.50 DRILL N 13,000.00 PROD1 CONFIGURING PITS FOR SWAP - LRS ON LOCATION/ PJSM. PT AGAINST CUSTOMER VALVE TO 3500# 03:00 05:30 2.50 DRILL N 13,000.00 PROD1 CIRCULATE - CIRCULATE 1% SLICK KCL W/ 0.6% BARALUBE 3.67 BPM IN RATE / 3.72 BPM OUT 8.43 PPG IN / 8.52 PPG OUT 0530 0630 1.00 DRILL N 13,000.00 PROD1 FREEZE PROTECT - LAY FREEZE PROTECTION (DIESEL) FROM 2500' - GREASE CREW SERVICE TREE INJECTOR OFF AT 07:07 Printed 7/25/2019 9*34:OOAM **All depths reported in Drillers Depths`* North America - ALASKA - BP Page 35 of 35 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 06:30 16:00 9.50 DRILL N 13,000.00 PROD1 START END OF WELL OPS REMOVE BAKER UQC CUT 20' OF COIL MU CTC AND PERFORM PULL TEST TO 50K HEAD UP BHI UQC PT TO 4500 PSI - GOOD TEST BLOW DOWN REELAND SURFACE LINES RD MPL REMOVE THE DRILLING RISER CHANGE THE ANNULAR ELEMENT INSTALL TEST RISER ND BOP's FLUSH MUD LINES MU TREE CAP FILL WITH METHANOL PERFORM LEAK TIGHT TEST RIG RELEASE @ 16:00 HRS Printed 7/25/2019 934 OOAM **All depths reported in Drillers Depths— 410' North America - ALASKA - BP PBU F-48 F-48APB1 500292218770 Design: F-48APB1 Final Survey Report 15 July, 2019 Company: North America - ALASKA - BP Project: PBU Site: F Well: F-48 Wellbore: F-48APB1 Design: F-48APB1 BP Final Survey Report Local Coordinate Reference: Well F-48 TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 OGP-Usa AK [4267`15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734`1586, Using geodetic scale factor Site F, TR -11-13 Site Position: Northing: 5,972,527.290 usft Latitude: 70° 19'55.283 N From: Map Easting: 650,960.700 usft Longitude: 148° 46'31 A68 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-48, F-48 Well Position +N/ -S 0.00 usft Northing: 5,974,882.730 usft Latitude: 700 20' 18.248 N +E/ -W 0.00 usft Easting: 651,958.630 usft Longitude: 148° 46'0+940 W Position Uncertainty 0.00 usft Wellhead Elevation: 35.71 usft Ground Level: 35.21 usft Wellbore F-48AP B 1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2018 7/1/2019 16.78 80.94 57,422 Design Audit Notes: Version: Phase: Tie On Depth: Vertical Section: Depth From (TVD) 0 +N/ -S +E/ -W 0 0 Direction 0 7/15/2019 9:01:31AM Page 2 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 7/15/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 12,495.89 1 : Schlumberger GCT multishot (F-48) GCT -MS Schlumberger GCT multishot 12,496.00 12,970.00 Survey #1 (F-48APB1) MWD MWD - Standard Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 29.12 0.00 0.00 29.12 -35.71 0.00 0.00 5,974,882.730 651,958.630 0.00 0.00 50.00 0.00 0.00 50.00 -14.83 0.00 0.00 5,974,882.730 651,958.630 0.00 0.00 58.60 0.23 150.58 58.60 -6.23 -0.02 0.01 5,974,882.715 651,958.639 2.67 -0.02 71.80 0.20 142.04 71.80 6.97 -0.06 0.04 5,974,882.674 651,958.667 0.33 -0.07 85.20 0.15 132.33 85.20 20.37 -0.09 0.06 5,974,882.645 651,958.695 0.43 -0.11 98.70 0.18 128.62 98.70 33.87 -0.11 0.09 5,974,882.620 651,958.725 0.24 -0.14 112.30 0.25 125.77 112.30 47.47 -0.14 0.13 5,974,882.590 651,958.766 0.52 -0.20 125.90 0.27 116.50 125.90 61.07 -0.17 0.19 5,974,882.560 651,958.820 0.34 -0.25 139.60 0.27 111.09 139.60 74.77 -0.20 0.25 5,974,882.535 651,958.879 0.19 -0.31 153.20 0.25 110.68 153.20 88.37 -0.22 0.30 5,974,882.514 651,958.937 0.15 -0.37 166.90 0.25 113.19 166.90 102.07 -0.24 0.36 5,974,882.493 651,958.993 0.08 -0.42 180.60 0.28 124.11 180.60 115.77 -0.27 0.41 5,974,882.464 651,959.049 0.43 -0.48 194.20 0.37 136.36 194.20 129.37 -0.33 0.47 5,974,882.414 651,959.108 0.83 -0.56 207.90 0.40 143.11 207.90 143.07 -0.40 0.53 5,974,882.345 651,959.168 0.40 -0.65 221.60 0.38 148.25 221.60 156.77 -0.47 0.58 5,974,882.270 651,959.223 0.29 -0.74 235.20 0.38 153.97 235.20 170.37 -0.55 0.63 5,974,882.192 651,959.268 0.28 -0.83 248.80 0.32 172.38 248.80 183.97 -0.63 0.65 5,974,882.114 651,959.294 0.93 -0.91 262.50 0.22 224.76 262.50 197.67 -0.69 0.64 5,974,882.057 651,959.282 1.86 -0.94 276.10 0.22 272.07 276.10 211.27 -0.70 0.59 5,974,882.039 651,959.238 1.30 -0.92 289.80 0.23 283.78 289.80 224.97 -0.70 0.54 5,974,882.045 651,959.185 0.34 -0.88 303.50 0.23 284.52 303.50 238.67 -0.68 0.49 5,974,882.057 651,959.131 0.02 -0.83 7/15/2019 9.01:31AM Page 3 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 317.30 0.23 283.05 317.30 252.47 -0.67 0.43 5,974,882.069 651,959.077 0.04 -0.78 331.10 0.20 284.63 331.10 266.27 -0.66 0.38 5,974,882.081 651,959.026 0.22 -0.74 344.90 0.13 301.62 344.90 280.07 -0.64 0.35 5,974,882.094 651,958.989 0.61 -0.70 358.70 0.07 333.02 358.70 293.87 -0.63 0.33 5,974,882.110 651,958.972 0.57 -0.68 372.60 0.02 5.36 372.60 307.77 -0.62 0.33 5,974,882.120 651,958.968 0.39 -0.67 386.40 0.00 37.96 386.40 321.57 -0.61 0.33 5,974,882.122 651,958.968 0.14 -0.67 400.20 0.00 132.71 400.20 335.37 -0.61 0.33 5,974,882.122 651,958.968 0.00 -0.67 413.90 0.02 211.27 413.90 349.07 -0.62 0.32 5,974,882.120 651,958.967 0.15 -0.67 427.60 0.05 215.08 427.60 362.77 -0.62 0.32 5,974,882.113 651,958.963 0.22 -0.67 441.40 0.08 218.38 441.40 376.57 -0.64 0.31 5,974,882.100 651,958.953 0.22 -0.67 455.30 0.08 217.55 455.30 390.47 -0.65 0.30 5,974,882.085 651,958.942 0.01 -0.68 469.10 0.10 218.50 469.10 404.27 -0.67 0.29 5,974,882.067 651,958.929 0.15 -0.68 482.90 0.13 224.15 482.90 418.07 -0.69 0.27 5,974,882.046 651,958.911 0.23 -0.68 496.90 0.15 229.99 496.90 432.07 -0.71 0.24 5,974,882.023 651,958.886 0.18 -0.68 510.80 0.17 240.27 510.80 445.97 -0.73 0.21 5,974,882.000 651,958.855 0.25 -0.68 524.80 0.17 256.34 524.80 459.97 -0.75 0.17 5,974,881.984 651,958.817 0.34 -0.66 538.80 0.17 276.70 538.80 473.97 -0.75 0.13 5,974,881.981 651,958.776 0.43 -0.63 552.80 0.13 294.40 552.80 487.97 -0.74 0.10 5,974,881.989 651,958.741 0.43 -0.60 566.70 0.10 305.90 566.70 501.87 -0.73 0.07 5,974,882.002 651,958.716 0.27 -0.58 580.60 0.05 315.26 580.60 515.77 -0.72 0.06 5,974,882.013 651,958.702 0.37 -0.56 594.50 0.02 319.10 594.50 529.67 -0.71 0.05 5,974,882.019 651,958.696 0.22 -0.55 608.50 0.00 298.53 608.50 543.67 -0.71 0.05 5,974,882.021 651,958.694 0.14 -0.55 622.50 0.02 271.60 622.50 557.67 -0.71 0.05 5,974,882.021 651,958.692 0.14 -0.55 636.50 0.05 260.43 636.50 571.67 -0.71 0.04 5,974,882.020 651,958.684 0.22 -0.54 650.50 0.07 255.58 650.50 585.67 -0.71 0.02 5,974,882.017 651,958.669 0.15 -0.53 664.50 0.10 260.31 664.50 599.67 -0.72 0.00 5,974,882.012 651,958.649 0.22 -0.52 678.70 0.10 273.25 678.70 613.87 -0.72 -0.02 5,974,882.010 651,958.625 0.16 -0.51 7/15/2019 9:01:31AM Page 4 COMPASS 5000.1 Build 8 1 D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 692.80 0.12 288.62 692.80 627.97 -0.71 -0.05 5,974,882.015 651,958.598 0.25 -0.49 707.00 0.10 300.75 707.00 642.17 -0.70 -0.07 5,974,882.026 651,958.573 0.22 -0.46 721.10 0.12 309.06 721.10 656.27 -0.69 -0.09 5,974,882.041 651,958.551 0.18 -0.43 735.20 0.12 312.66 735.20 670.37 -0.67 -0.12 5,974,882.060 651,958.528 0.05 -0.40 749.20 0.12 315.17 749.20 684.37 -0.65 -0.14 5,974,882.080 651,958.507 0.04 -0.37 763.30 0.10 320.45 763.30 698.47 -0.63 -0.15 5,974,882.099 651,958.488 0.16 -0.35 777.30 0.10 320.71 777.30 712.47 -0.61 -0.17 5,974,882.118 651,958.472 0.00 -0.32 791.20 0.08 325.21 791.20 726.37 -0.59 -0.18 5,974,882.135 651,958.459 0.15 -0.30 805.10 0.07 0.28 805.10 740.27 -0.58 -0.19 5,974,882.151 651,958.453 0.33 -0.29 819.00 0.08 44.50 819.00 754.17 -0.56 -0.18 5,974,882.167 651,958.459 0.41 -0.28 833.00 0.08 61.02 833.00 768.17 -0.55 -0.17 5,974,882.179 651,958.474 0.16 -0.28 847.00 0.08 61.91 847.00 782.17 -0.54 -0.15 5,974,882.188 651,958.491 0.01 -0.29 861.00 0.10 66.75 861.00 796.17 -0.53 -0.13 5,974,882.198 651,958.511 0.15 -0.29 875.00 0.10 77.37 875.00 810.17 -0.52 -0.11 5,974,882.206 651,958.534 0.13 -0.30 889.00 0.10 86.06 889.00 824.17 -0.52 -0.08 5,974,882.210 651,958.558 0.11 -0.32 903.00 0.10 86.73 903.00 838.17 -0.52 -0.06 5,974,882.212 651,958.582 0.01 -0.33 917.00 0.12 83.83 917.00 852.17 -0.51 -0.03 5,974,882.215 651,958.609 0.15 -0.35 930.90 0.13 79.78 930.90 866.07 -0.51 0.00 5,974,882.220 651,958.639 0.10 -0.37 944.90 0.15 76.86 944.90 880.07 -0.50 0.03 5,974,882.228 651,958.672 0.15 -0.39 958.80 0.13 78.39 958.80 893.97 -0.50 0.07 5,974,882.236 651,958.705 0.15 -0.40 972.70 0.13 74.91 972.70 907.87 -0.49 0.10 5,974,882.243 651,958.736 0.06 -0.42 986.70 0.13 70.11 986.70 921.87 -0.48 0.13 5,974,882.254 651,958.766 0.08 -0.43 1,000.60 0.13 70.60 1,000.60 935.77 -0.47 0.16 5,974,882.265 651,958.795 0.01 -0.45 1,014.50 0.15 70.51 1,014.50 949.67 -0.46 0.19 5,974,882.277 651,958.827 0.14 -0.46 1,028.50 0.15 71.11 1,028.50 963.67 -0.45 0.22 5,974,882.290 651,958.862 0.01 -0.48 1,042.40 0.17 73.59 1,042.40 977.57 -0.43 0.26 5,974,882.302 651,958.898 0.15 -0.49 1,056.40 0.18 74.46 1,056.40 991.57 -0.42 0.30 5,974,882.315 651,958.939 0.07 -0.51 7/15/2019 9:01:31AM Page 5 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: PBU Site: F Well: F-48 Wellbore: F-48APB1 Design: F-48APB1 Survey MD (usft) 1,070.30 1,084.10 1,098.00 1,112.00 1,125.90 1,139.90 1,153.80 1,167.80 1,181.70 1,195.70 1,209.70 1.223.70 1,237.70 1,251.60 1,265.50 1,279.40 1,293.40 1,307.40 1,321.40 1, 335.40 1,349.30 1.36130 1,377.30 1,391.40 1,405.40 1,419.40 1,433.40 BP Final Survey Report Local Co-ordinate Reference: Well F-48 ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 0.18 73.68 1,070.30 1,005.47 -0.41 0.34 5,974,882.327 651,958.981 0.02 -0.53 0.18 73.44 1,084.10 1,019.27 -0.40 0.38 5,974,882.341 651,959.022 0.01 -0.55 0.20 74.30 1,098.00 1,033.17 -0.38 0.43 5,974,882.354 651,959.066 0.15 -0.57 0.23 76.02 1,112.00 1,047.17 -0.37 0.48 5,974,882.369 651,959.117 0.22 -0.60 0.27 76.98 1,125.90 1,061.07 -0.36 0.54 5,974,882.384 651,959.175 0.29 -0.63 0.27 77.20 1,139.90 1,075.07 -0.34 0.60 5,974,882.400 651,959.239 0.01 -0.66 0.27 78.60 1,153.79 1,088.96 -0.33 0.67 5,974,882.415 651,959.303 0.05 -0.70 0.28 79.73 1,167.79 1,102.96 -0.32 0.73 5, 974, 882.429 651,959.369 0.08 -0.73 0.32 80.88 1,181.69 1,116.86 -0.30 0.80 5,974,882.443 651,959.440 0.29 -0.77 0.35 82.95 1,195.69 1,130.86 -0.29 0.89 5,974,882.456 651,959.521 0.23 -0.82 0.37 83.07 1,209.69 1,144.86 -0.28 0.97 5,974,882.468 651,959.608 0.14 -0.87 0.35 82.29 1,223.69 1,158.86 -0.27 1.06 5,974,882.481 651,959.695 0.15 -0.93 0.35 81.98 1,237.69 1,172.86 -0.26 1.14 5,974,882.495 651,959.780 0.01 -0.98 0.40 81.55 1,251.59 1,186.76 -0.25 1.23 5,974,882.509 651,959.869 0.36 -1.03 0.45 83.45 1,265.49 1,200.66 -0.23 1.34 5,974,882.525 651,959.971 0.37 -1.09 0.48 85.18 1,279.39 1,214.56 -0.22 1.45 5,974,882.538 651,960.083 0.24 -1.16 0.48 86.24 1,293.39 1,228.56 -0.21 1.57 5,974,882.549 651,960.200 0.06 -1.23 0.47 89.32 1,307.39 1,242.56 -0.21 1.68 5,974,882.556 651,960.316 0.20 -1.31 0.45 89.86 1,321.39 1,256.56 -0.21 1.79 5,974,882.559 651,960.428 0.15 -1.39 0.47 88.78 1,335.39 1,270.56 -0.21 1.91 5,974,882.563 651,960.541 0.16 -1.46 0.47 89.46 1,349.29 1,284.46 -0.20 2.02 5,974,882.567 651,960.654 0.04 -1.54 0.48 89.20 1,363.29 1,298.46 -0.20 2.14 5,974,882.571 651,960.770 0.07 -1.62 0.48 88.47 1,377.29 1,312.46 -0.20 2.25 5,974,882.575 651,960.888 0.04 -1.70 0.47 88.66 1,391.39 1,326.56 -0.20 2.37 5,974,882.581 651,961.004 0.07 -1.78 0.47 87.48 1,405.39 1,340.56 -0.19 2.49 5,974,882.587 651,961.119 0.07 -1.86 0.48 84.59 1,419.39 1,354.56 -0.19 2.60 5,974,882.597 651,961.235 0.19 -1.93 0.48 83.12 1,433.39 1,368.56 -0.17 2.72 5,974,882.612 651,961.351 0.09 -2.00 7/1512019 9.01:31AM Page 6 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: F Well: F-48 Wellbore: F-48APB1 Design: F-48APB1 Survey MD (usft) 1,447.50 1,461.50 1,475.60 1,489.70 1,503.80 1,517.90 1,532.10 1,546.30 1,560.50 1,574.70 1,588.60 1,602.50 1,616.40 1,630.30 1,644.30 1,658.30 1,672.30 1,686.40 1,700.50 1,714.60 1,728.70 1,742.90 1,757.00 1,771.10 1,785.00 1,799A0 1,81120 BP Final Survey Report Local Coordinate Reference: Well F-48 TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 0.50 83.12 1,447.49 1,382.66 -0.16 2.84 5,974,882.629 651,961.470 0.14 -2.07 0.50 83.67 1,461.49 1,396.66 -0.14 2.96 5,974,882.646 651,961.591 0.03 -2.15 0.50 84.21 1,475.59 1,410.76 -0.13 3.08 5,974,882.661 651,961.713 0.03 -2.22 0.48 85.05 1,489.68 1,424.85 -0.12 3.20 5,974,882.675 651,961.833 0.15 -2.30 0.40 84.85 1,503.78 1,438.95 -0.11 3.31 5,974,882.687 651,961.941 0.57 -2.36 0.25 75.75 1,517.88 1,453.05 -0.10 3.39 5,974,882.700 651,962.019 1.12 -2.41 0.25 8.31 1,532.08 1,467.25 -0.06 3.42 5,974,882.739 651,962.053 1.95 -2.41 0.75 300.49 1,546.28 1,481.45 0.02 3.35 5,974,882.815 651,961.976 4.90 -2.30 1.55 292.09 1,560.48 1,495.65 0.14 3.09 5,974,882.929 651,961.716 5.74 -2.03 2.30 292.37 1,574.67 1,509.84 0.32 2.65 5,974,883.101 651,961.271 5.28 -1.60 2.80 292.65 1,588.56 1,523.73 0.55 2.08 5,974,883.326 651,960.695 3.60 -1.03 3.02 293.93 1,602.44 1,537.61 0.83 1.43 5,974,883.592 651,960.041 1.65 -0.38 3.30 297.40 1,616.32 1,551.49 1.17 0.74 5,974,883.911 651,959.345 2.44 0.33 3.67 301.78 1,630.19 1,565.36 1.58 0.01 5,974,884.314 651,958.603 3.28 1.14 4.18 306.95 1,644.16 1,579.33 2.13 -0.78 5,974,884.841 651,957.804 4.43 2.08 4.88 312.48 1,658.12 1,593.29 2.84 -1.63 5,974,885.533 651,956.943 5.89 3.18 5.35 315.38 1,672.06 1,607.23 3.70 -2.53 5,974,886.381 651,956.028 3.83 4.42 5.60 316.07 1,686.10 1,621.27 4.67 -3.47 5,974,887.325 651,955.069 1.83 5.77 5.92 316.55 1,700.13 1,635.30 5.69 -4.44 5,974,888.328 651,954.072 2.30 7.18 6.13 316.73 1,714.15 1,649.32 6.77 -5.46 5,974,889.383 651,953.034 1.50 8.66 6.43 316.67 1,728.16 1,663.33 7.89 -6.52 5,974,890.484 651,951.954 2.13 10.21 6.85 316.50 1,742.27 1,677.44 9.08 -7.65 5,974,891.653 651,950.801 2.96 11.85 7.15 316.34 1,756.26 1,691.43 10.33 -8.83 5,974,892.874 651,949.592 2.13 13.57 7.70 316.10 1,770.24 1,705.41 11.64 -10.09 5,974,894.163 651,948.305 3.91 15.39 8.38 315.72 1,784.01 1,719.18 13.04 -11.45 5,974,895.532 651,946.924 4.91 17.33 8.85 315.34 1,797.95 1,733.12 14.54 -12.92 5,974,897.008 651,945.414 3.36 19.45 9.48 314.74 1,811.87 1,747.04 16.13 -14.51 5,974,898.565 651,943.795 4.52 21.69 7/15/2019 9:01.31AM Page 7 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,827.20 10.08 314.14 1,825.67 1,760.84 17.80 -16.21 5,974,900.195 651,942.064 4.35 24.07 1,841.30 10.55 313.77 1,839.54 1,774.71 19.55 -18.03 5,974,901.909 651,940.211 3.37 26.59 1,855.50 11.25 313.41 1,853.48 1,788.65 21.40 -19.97 5,974,903.721 651,938.229 4.95 29.27 1,869.60 11.82 313.14 1,867.30 1,802.47 23.33 -22.03 5,974,905.611 651,936.138 4.06 32.09 1,883.60 12.33 313.10 1,880.99 1,816.16 25.34 -24.16 5,974,907.569 651,933.960 3.64 35.01 1,897.60 13.08 313.10 1,894.64 1,829.81 27.44 -26.41 5,974,909.627 651,931.670 5.36 38.09 1,911.60 13.60 313.02 1,908.27 1,843.44 29.65 -28.77 5,974,911.784 651,929.266 3.72 41.31 1,925.80 14.07 313.00 1,922.05 1,857.22 31.96 -31.25 5,974,914.049 651,926.736 3.31 44.70 1,940.00 14.58 312.97 1,935.81 1,870.98 34.36 -33.82 5,974,916.392 651,924.118 3.59 48.21 1,954.00 14.88 312.92 1,949.35 1,884.52 36.78 -36.43 5,974,918.763 651,921.464 2.14 51.76 1,968.20 15.17 312.91 1,963.07 1,898.24 39.29 -39.13 5,974,921.215 651,918.718 2.04 55.43 1,982.30 15.45 312.90 1,976.67 1,911.84 41.82 -41.85 5,974,923.693 651,915.941 1.99 59.15 1,996.70 15.63 312.84 1,990.54 1,925.71 44.45 -44.68 5,974,926.260 651,913.061 1.25 63.00 2,011.20 15.85 312.61 2,004.50 1,939.67 47.12 -47.57 5,974,928.869 651,910.118 1.58 66.93 2,025.50 16.05 312.39 2,018.25 1,953.42 49.77 -50.47 5,974,931.465 651,907.168 1.46 70.85 2,039.80 16.35 312.29 2,031.98 1,967.15 52.46 -53.42 5,974,934.091 651,904.165 2.11 74.83 2,054.30 16.80 312.20 2,045.88 1,981.05 55.24 -56.48 5,974,936.809 651,901.047 3.11 78.95 2,068.70 17.18 312.03 2,059.65 1,994.82 58.06 -59.60 5,974,939.567 651,897.870 2.66 83.15 2,083.00 17.65 311.79 2,073.29 2,008.46 60.92 -62.79 5,974,942.360 651,894.628 3.32 87.42 2,097.30 18.18 311.54 2,086.90 2,022.07 63.84 -66.07 5,974,945.217 651,891.283 3.75 91.80 2,117.00 19.00 311.23 2,105.57 2,040.74 68.00 -70.78 5,974,949.272 651,886.488 4.19 98.06 2,147.00 20.28 310.93 2,133.82 2,068.99 74.62 -78.38 5,974,955.741 651,878.755 4.28 108.10 2,179.70 21.48 310.98 2,164.38 2,099.55 82.26 -87.19 5,974,963.200 651,869.801 3.67 119.70 2,214.50 22.43 311.46 2,196.65 2,131.82 90.83 -96.97 5,974,971.573 651,859.844 2.78 132.66 2,250.30 23.17 312.27 2,229.65 2,164.82 100.09 -107.30 5,974,980.621 651,849.329 2.25 146.49 2,286.10 23.82 313.17 2,262.49 2,197.66 109.78 -117.79 5,974,990.089 651,838.652 2.07 160.73 2,321.90 24.35 313.93 2,295.17 2,230.34 119.84 -128.37 5,974,999.938 651,827.863 1.72 175.32 7/15/2019 9.01:31AM Page 8 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 2,357.70 24.80 314.52 2,327.73 2,262.90 130.23 -139.04 5,975,010.104 651,816.987 1.43 190.20 2,393.00 25.45 315.20 2,359.69 2,294.86 140.80 -149.67 5,975,020.459 651,806.152 2.01 205.18 2,428.40 26.20 315.99 2,391.55 2,326.72 151.82 -160.46 5,975,031.255 651,795.143 2.33 220.60 2,463.80 26.70 316.89 2,423.25 2,358.42 163.25 -171.32 5,975,042.458 651,784.050 1.81 236.37 2,499.10 27.05 318.14 2,454.73 2,389.90 175.01 -182.10 5,975,054.004 651,773.038 1.88 252.32 2,534.40 27.40 319.64 2,486.12 2,421.29 187.18 -192.71 5,975,065.953 651,762.178 2.18 268.45 2,569.60 27.82 321.20 2,517.31 2,452.48 199.75 -203.10 5,975,078.312 651,751.534 2.38 284.72 2,605.10 28.30 322.63 2,548.64 2,483.81 212.90 -213.40 5,975,091.244 651,740.972 2.33 301.34 2,640.50 28.90 323.58 2,579.72 2,514.89 226.45 -223.58 5,975,104.586 651,730.528 2.13 318.17 2,675.90 29.82 324.07 2,610.58 2,545.75 240.46 -233.82 5,975,118.386 651,720.004 2.69 335.38 2,711.40 30.92 324.31 2,641.20 2,576.37 255.02 -244.32 5,975,132.724 651,709.211 3.12 353.16 2,746.90 31.78 324.22 2,671.52 2,606.69 270.01 -255.11 5,975,147.493 651,698.123 2.43 371.46 2,782.30 32.50 323.40 2,701.50 2,636.67 285.21 -266.23 5,975,162.461 651,686.698 2.38 390.13 2,817.80 33.37 321.67 2,731.29 2,666.46 300.52 -277.97 5,975,177.535 651,674.649 3.61 409.32 2,853.30 34.27 320.15 2,760.78 2,695.95 315.85 -290.43 5,975,192.611 651,661.881 3.48 429.02 2,888.80 35.13 319.27 2,789.97 2,725.14 331.27 -303.50 5,975,207.756 651,648.503 2.80 449.19 2,924.30 36.23 317.73 2,818.81 2,753.98 346.77 -317.22 5,975,222.977 651,634.471 4.00 469.88 2,959.60 37.45 315.78 2,847.06 2,782.23 362.18 -331.72 5,975,238.091 651,619.660 4.79 491.04 2,995.00 38.33 314.68 2,875.00 2,810.17 377.62 -347.03 5,975,253.209 651,604.040 3.13 512.78 3,030.60 38.95 314.34 2,902.80 2,837.97 393.20 -362.89 5,975,268.466 651,587.876 1.84 535.00 3,066.20 39.62 314.18 2,930.36 2,865.53 408.93 -379.03 5,975,283.866 651,571.418 1.90 557.52 3,101.80 40.50 313.70 2,957.60 2,892.77 424.83 -395.53 5,975,299.425 651,554.602 2.62 580.41 3,137.30 41.50 312.89 2,984.40 2,919.57 440.80 -412.48 5,975,315.047 651,537.331 3.19 603.67 3,172.50 42.40 312.34 3,010.57 2,945.74 456.73 -429.80 5,975,330.622 651,519.696 2.76 627.15 3,207.50 43.07 312.16 3,036.28 2,971.45 472.70 -447.38 5,975,346.231 651,501.797 1.95 650.84 3,242.60 43.88 312.15 3,061.75 2,996.92 488.91 -465.28 5,975,362.072 651,483.570 2.31 674.92 3,277.80 45.22 312.14 3,086.84 3,022.01 505.48 -483.59 5,975,378.265 651,464.930 3.81 699.55 7/15/2019 9:01:31AM Page 9 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) (I V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,312.90 46.82 311.87 3,111.21 3,046.38 522.38 -502.36 5,975,394.781 651,445.825 4.59 724.73 3,347.80 48.02 311.60 3,134.82 3,069.99 539.48 -521.54 5,975,411.494 651,426.307 3.49 750.34 3,382.80 48.72 311.54 3,158.07 3,093.24 556.84 -541.11 5,975,428.451 651,406.389 2.00 776.41 3,417.80 49.27 311.50 3,181.04 3,116.21 574.35 -560.88 5,975,445.554 651,386.264 1.57 802.73 3,452.90 49.77 311.44 3,203.83 3,139.00 592.03 -580.89 5,975,462.824 651,365.906 1.43 829.33 3,488.00 50.28 311.28 3,226.38 3,161.55 609.80 -601.08 5,975,480.183 651,345.362 1.49 856.12 3,523.10 50.83 310.99 3,248.68 3,183.85 627.63 -621.49 5,975,497.595 651,324.592 1.69 883.12 3,558.30 51.40 310.75 3,270.77 3,205.94 645.56 -642.21 5,975,515.099 651,303.515 1.70 910.39 3,593.40 52.00 310.66 3,292.53 3,227.70 663.53 -663.09 5,975,532.635 651,282.275 1.72 937.80 3,628.60 52.47 310.64 3,314.08 3,249.25 681.65 -684.21 5,975,550.329 651,260.801 1.34 965.49 3,663.80 52.78 310.64 3,335.45 3,270.62 699.87 -705.43 5,975,568.113 651,239.212 0.88 993.32 3,699.00 53.05 310.65 3,356.68 3,291.85 718.16 -726.74 5,975,585.967 651,217.541 0.77 1,021.26 3,734.10 53.08 310.68 3,377.77 3,312.94 736.45 -748.02 5,975,603.813 651,195.895 0.11 1,049.18 3,769.20 53.05 310.73 3,398.86 3,334.03 754.74 -769.29 5,975,621.674 651,174.261 0.14 1,077.10 3,804.20 53.07 310.78 3,419.89 3,355.06 773.01 -790.48 5,975,639.502 651,152.706 0.13 1,104.94 3,839.40 53.08 310.82 3,441.04 3,376.21 791.39 -811.78 5,975,657.452 651,131.038 0.10 1,132.94 3,874.60 53.33 310.84 3,462.13 3,397.30 809.82 -833.11 5,975,675.444 651,109.342 0.71 1,161.00 3,909.70 53.58 310.82 3,483.03 3,418.20 828.26 -854.45 5,975,693.444 651,087.638 0.71 1,189.06 3,944.40 53.58 310.83 3,503.63 3,438.80 846.51 -875.58 5,975,711.265 651,066.145 0.02 1,216.86 3,979.20 53.58 310.89 3,524.29 3,459.46 864.83 -896.75 5,975,729.150 651,044.600 0.14 1,244.73 4,013.90 53.60 310.90 3,544.88 3,480.05 883.12 -917.86 5,975,747.000 651,023.126 0.06 1,272.53 4,048.60 53.53 310.88 3,565.49 3,500.66 901.39 -938.97 5,975,764.842 651,001.657 0.21 1,300.32 4,083.40 53.55 310.88 3,586.17 3,521.34 919.71 -960.13 5,975,782.726 650,980.130 0.06 1,328.18 4,118.10 53.57 310.89 3,606.78 3,541.95 937.98 -981.24 5,975,800.565 650,958.661 0.06 1,355.96 4,152.90 53.55 310.86 3,627.45 3,562.62 956.30 -1,002.40 5,975,818.452 650,937.127 0.09 1,383.83 4,187.40 53.67 310.81 3,647.92 3,583.09 974.46 -1,023.42 5,975,836.181 650,915.752 0.37 1,411.47 4,221.80 53.68 310.74 3,668.30 3,603.47 992.56 -1,044.40 5,975,853.851 650,894.403 0.17 1,439.06 7/15/2019 9:01.31AM Page 10 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,256.50 53.70 310.73 3,688.85 3,624.02 1,010.81 -1,065.59 5,975,871.664 650,872.851 0.06 1,466.88 4,291.10 53.87 310.73 3,709.29 3,644.46 1,029.02 -1,086.75 5,975,889.445 650,851.334 0.49 1,494.66 4,325.70 53.90 310.70 3,729.68 3,664.85 1,047.26 -1,107.93 5,975,907.243 650,829.784 0.11 1,522.48 4,360.30 53.95 310.67 3,750.06 3,685.23 1,065.49 -1,129.14 5,975,925.038 650,808.215 0.16 1,550.30 4,394.90 54.20 310.66 3,770.36 3,705.53 1,083.74 -1,150.39 5,975,942.861 650,786.598 0.72 1,578.18 4,429.50 54.55 310.66 3,790.51 3,725.68 1,102.07 -1,171.73 5,975,960.748 650,764.897 1.01 1,606.17 4,464.10 54.90 310.66 3,810.49 3,745.66 1,120.47 -1,193.15 5,975,978.714 650,743.102 1.01 1,634.28 4,498.70 55.23 310.66 3,830.31 3,765.48 1,138.96 -1,214.67 5,975,996.754 650,721.217 0.95 1,662.50 4,526.50 55.60 310.63 3,846.09 3,781.26 1,153.86 -1,232.04 5,976,011.306 650,703.553 1.33 1,685.27 4,551.90 55.95 310.62 3,860.37 3,795.54 1,167.54 -1,247.98 5,976,024.654 650,687.341 1.38 1,706.17 4,577.30 56.32 310.62 3,874.53 3,809.70 1,181.27 -1,263.99 5,976,038.056 650,671.058 1.46 1,727.15 4,602.70 56.58 310.61 3,888.56 3,823.73 1,195.05 -1,280.06 5,976,051.507 650,654.714 1.02 1,748.21 4,628.20 56.67 310.61 3,902.59 3,837.76 1,208.91 -1,296.22 5,976,065.037 650,638.272 0.35 1,769.40 4,653.80 56.57 310.61 3,916.68 3,851.85 1,222.83 -1,312.45 5,976,078.618 650,621.766 0.39 1,790.67 4,678.90 56.22 310.68 3,930.57 3,865.74 1,236.44 -1,328.31 5,976,091.910 650,605.632 1.41 1,811.47 4,704.10 55.90 310.71 3,944.64 3,879.81 1,250.07 -1,344.16 5,976,105.217 650,589.509 1.27 1,832.27 4,729.30 55.68 310.64 3,958.81 3,893.98 1,263.66 -1,359.97 5,976,118.475 650,573.433 0.90 1,853.01 4,754.80 55.55 310.53 3,973.21 3,908.38 1,277.35 -1,375.95 5,976,131.838 650,557.178 0.62 1,873.95 4,782.70 55.62 310.45 3,988.98 3,924.15 1,292.29 -1,393.46 5,976,146.425 650,539.376 0.34 1,896.84 4,811.00 55.80 310.47 4,004.92 3,940.09 1,307.47 -1,411.25 5,976,161.232 650,521.284 0.64 1,920.10 4,839.60 55.93 310.46 4,020.97 3,956.14 1,322.83 -1,429.26 5,976,176.226 650,502.967 0.46 1,943.65 4,870.30 56.02 310.46 4,038.15 3,973.32 1,339.34 -1,448.62 5,976,192.340 650,483.279 0.29 1,968.95 4,900.60 56.10 310.48 4,055.07 3,990.24 1,355.65 -1,467.74 5,976,208.264 650,463.830 0.27 1,993.96 4,930.30 56.00 310.50 4,071.65 4,006.82 1,371.65 -1,486.48 5,976,223.877 650,444.774 0.34 2,018.47 4,959.60 55.87 310.61 4,088.06 4,023.23 1,387.43 -1,504.92 5,976,239.280 650,426.018 0.54 2,042.61 4,987.00 55.85 310.74 4,103.44 4,038.61 1,402.21 -1,522.12 5,976,253.708 650,408.524 0.40 2,065.18 5,014.40 55.73 310.86 4,118.85 4,054.02 1,417.02 -1,539.27 5,976,268.163 650,391.075 0.57 2,087.73 7/15/2019 9:01.31AM Page 11 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,041.90 55.58 310.99 4,134.36 4,069.53 1,431.89 -1,556.42 5,976,282.684 650,373.623 0.67 2,110.33 5,069.40 55.63 311.09 4,149.90 4,085.07 1,446.79 -1,573.54 5,976,297.233 650,356.211 0.35 2,132.93 5,097.00 55.65 311.10 4,165.47 4,100.64 1,461.77 -1,590.71 5,976,311.857 650,338.742 0.08 2,155.61 5,124.60 55.63 311.05 4,181.05 4,116.22 1,476.74 -1,607.89 5,976,326.475 650,321.267 0.17 2,178.30 5,152.20 55.57 311.02 4,196.64 4,131.81 1,491.69 -1,625.06 5,976,341.073 650,303.791 0.24 2,200.97 5,179.90 55.55 311.02 4,212.31 4,147.48 1,506.68 -1,642.30 5,976,355.713 650,286.256 0.07 2,223.72 5,207.50 55.72 310.99 4,227.89 4,163.06 1,521.63 -1,659.49 5,976,370.309 650,268.765 0.62 2,246.40 5,234.90 55.57 310.89 4,243.35 4,178.52 1,536.45 -1,676.58 5,976,384.781 650,251.382 0.62 2,268.92 5,262.50 55.42 310.72 4,258.98 4,194.15 1,551.32 -1,693.80 5,976,399.291 650,233.870 0.74 2,291.56 5,290.10 55.47 310.59 4,274.64 4,209.81 1,566.13 -1,711.04 5,976,413.747 650,216.330 0.43 2,314.18 5,317.80 55.28 310.54 4,290.38 4,225.55 1,580.95 -1,728.36 5,976,428.215 650,198.718 0.70 2,336.85 5,345.50 54.97 310.55 4,306.22 4,241.39 1,595.72 -1,745.63 5,976,442.633 650,181.155 1.12 2,359.46 5,373.20 54.95 310.58 4,322.12 4,257.29 1,610.47 -1,762.85 5,976,457.029 650,163.632 0.11 2,382.02 5,400.80 55.17 310.57 4,337.93 4,273.10 1,625.19 -1,780.04 5,976,471.393 650,146.154 0.80 2,404.53 5,428.00 54.98 310.56 4,353.50 4,288.67 1,639.69 -1,796.98 5,976,485.548 650,128.923 0.70 2,426.72 5,455.10 54.65 310.60 4,369.12 4,304.29 1,654.10 -1,813.80 5,976,499.611 650,111.814 1.22 2,448.75 5,482.20 54.27 310.62 4,384.87 4,320.04 1,668.45 -1,830.54 5,976,513.621 650,094.787 1.40 2,470.69 5,509.40 53.73 310.60 4,400.86 4,336.03 1,682.77 -1,847.25 5,976,527.602 650,077.796 1.99 2,492.59 5,536.40 53.43 310.58 4,416.89 4,352.06 1,696.91 -1,863.75 5,976,541.400 650,061.015 1.11 2,514.20 5,563.40 53.33 310.51 4,432.99 4,368.16 1,711.00 -1,880.22 5,976,555.149 650,044.267 0.42 2,535.76 5,590.60 53.10 310.40 4,449.28 4,384.45 1,725.13 -1,896.79 5,976,568.944 650,027.410 0.91 2,557.43 5,617.80 53.03 310.31 4,465.62 4,400.79 1,739.21 -1,913.36 5,976,582.682 650,010.561 0.37 2,579.05 5,644.90 53.10 310.28 4,481.91 4,417.08 1,753.22 -1,929.88 5,976,596.353 649,993.760 0.27 2,600.59 5,672.30 52.98 310.39 4,498.38 4,433.55 1,767.39 -1,946.57 5,976,610.182 649,976.788 0.54 2,622.36 5,700.10 52.85 310.58 4,515.15 4,450.32 1,781.79 -1,963.44 5,976,624.234 649,959.634 0.72 2,644.42 5,728.00 52.95 310.74 4,531 98 4,467.15 1,796.29 -1,980.32 5,976,638.387 649,942.464 0.58 2,666.56 5,755.90 53.08 310.84 4,548.76 4,483.93 1,810.85 -1,997.19 5,976,652.601 649,925.300 0.55 2,688.75 7/15/2019 9:01:31AM Page 12 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48AP61 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,783.80 53.23 310.92 4,565.49 4,500.66 1,825.46 -2,014.07 5,976,666.867 649,908.128 0.58 2,710.97 5,811.70 53.30 311.12 4,582.18 4,517.35 1,840.14 -2,030.94 5,976,681.196 649,890.965 0.63 2,733.23 5,839.60 53.17 311.51 4,598.88 4,534.05 1,854.89 -2,047.73 5,976,695.608 649,873.884 1.21 2,755.49 5,867.30 52.92 311.94 4,615.53 4,550.70 1,869.62 -2,064.25 5,976,710.001 649,857.069 1.53 2,777.56 5,895.00 52.60 312.29 4,632.29 4,567.46 1,884.41 -2,080.61 5,976,724.454 649,840.416 1.53 2,799.55 5,922.80 52.50 312.54 4,649.20 4,584.37 1,899.30 -2,096.90 5,976,739.005 649,823.825 0.80 2,821.57 5,950.70 52.50 312.66 4,666.18 4,601.35 1,914.28 -2,113.20 5,976,753.653 649,807.233 0.34 2,843.65 5,978.50 52.33 312.75 4,683.14 4,618.31 1,929.22 -2,129.38 5,976,768.263 649,790.745 0.66 2,865.64 6,006.40 52.18 312.86 4,700.22 4,635.39 1,944.21 -2,145.57 5,976,782.921 649,774.260 0.62 2,887.66 6,034.30 52.03 313.10 4,717.35 4,652.52 1,959.22 -2,161.68 5,976,797.601 649,757.853 0.87 2,909.63 6,062.20 51.83 313.39 4,734.56 4,669.73 1,974.27 -2,177.68 5,976,812.320 649,741.553 1.09 2,931.57 6,090.10 51.88 313.51 4,751.79 4,686.96 1,989.36 -2,193.61 5,976,827.083 649,725.322 0.38 2,953.48 6,118.00 52.08 313.60 4,768.97 4,704.14 2,004.51 -2,209.54 5,976,841.901 649,709.091 0.76 2,975.43 6,145.50 52.07 313.86 4,785.88 4,721.05 2,019.50 -2,225.21 5,976,856.575 649,693.116 0.75 2,997.10 6,173.00 51.75 314.11 4,802.84 4,738.01 2,034.53 -2,240.78 5,976,871.286 649,677.243 1.37 3,018.73 6,200.20 51.08 314.28 4,819.81 4,754.98 2,049.35 -2,256.03 5,976,885.794 649,661.703 2.51 3,039.97 6,227.50 50.43 314.45 4,837.08 4,772.25 2,064.14 -2,271.14 5,976,900.267 649,646.293 2.43 3,061.10 6,254.90 49.73 314.51 4,854.66 4,789.83 2,078.86 -2,286.14 5,976,914.683 649,631.005 2.56 3,082.10 6,282.30 49.18 314.49 4,872.47 4,807.64 2,093.45 -2,300.99 5,976,928.971 649,615.863 2.01 3,102.91 6,309.70 49.23 314.48 4,890.37 4,825.54 2,107.99 -2,315.79 5,976,943.203 649,600.774 0.18 3,123.65 6,337.10 49.50 314.51 4,908.22 4,843.39 2,122.56 -2,330.62 5,976,957.471 649,585.650 0.99 3,144.43 6,364.50 49.83 314.52 4,925.95 4,861.12 2,137.20 -2,345.51 5,976,971.808 649,570.465 1.20 3,165.30 6,391.90 50.12 314.54 4,943.57 4,878.74 2,151.92 -2,360.47 5,976,986.215 649,555.213 1.06 3,186.27 6,419.40 50.43 314.60 4,961.15 4,896.32 2,166.76 -2,375.54 5,977,000.749 649,539.849 1.14 3,207.41 6,446.80 50.77 314.64 4,978.54 4,913.71 2,181.63 -2,390.61 5,977,015.311 649,524.481 1.25 3,228.58 6,474.20 51.02 314.66 4,995.82 4,930.99 2,196.58 -2,405.73 5,977,029.943 649,509.056 0.91 3,249.83 6,501.60 51.22 314.75 5,013.02 4,946.19 2,211.58 -2,420.89 5,977,044.636 649,493.597 0.77 3,271.15 7/1512019 9:01:31AM Page 13 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,528.80 5137 314.92 5,030.03 4,965.20 2,226.55 -2,435.95 5,977,059.293 649,478.245 0.74 3,292.37 6,556.00 51.55 315.06 5,046.98 4,982.15 2,241.59 -2,450.99 5,977,074.025 649,462.898 0.77 3,313.64 6,583.20 51.75 315.16 5,063.85 4,999.02 2,256.70 -2,466.05 5,977,088.828 649,447.542 0.79 3,334.96 6,610.60 51.95 315.29 5,080.78 5,015.95 2,272.00 -2,481.22 5,977,103.812 649,432.060 0.82 3,356.51 6,638.00 52.13 315.44 5,097.63 5,032.80 2,287.37 -2,496.40 5,977,118.873 649,416.574 0.79 3,378.11 6,665.40 52.32 315.55 5,114.42 5,049.59 2,302.82 -2,511.58 5,977,134.007 649,401.084 0.76 3,399.76 6,692.80 52.58 315.61 5,131.12 5,066.29 2,318.33 -2,526.79 5,977,149.210 649,385.570 0.96 3,421.48 6,720.30 52.87 315.67 5,147.77 5,082.94 2,333.98 -2,542.09 5,977,164.541 649,369.957 1.07 3,443.36 6,747.80 53.18 315.70 5,164.31 5,099.48 2,349.70 -2,557.43 5,977,179.945 649,354.295 1.13 3,465.33 6,775.20 53.48 315.72 5,180.67 5,115.84 2,365.43 -2,572.78 5,977,195.361 649,338.634 1.10 3,487.31 6,802.70 53.77 315.73 5,196.98 5,132.15 2,381.28 -2,588.24 5,977,210.897 649,322.860 1.05 3,509.45 6,830.20 54.12 315.72 5,213.17 5,148.34 2,397.20 -2,603.76 5,977,226.497 649,307.021 1.27 3,531.68 6,857.30 54.47 315.71 5,228.99 5,164.16 2,412.95 -2,619.12 5,977,241.934 649,291.341 1.29 3,553.68 6,884.20 54.78 315.73 5,244.56 5,179.73 2,428.66 -2,634.44 5,977,257.323 649,275.714 1.15 3,575.61 6,911.00 55.10 315.75 5,259.95 5,195.12 2,444.37 -2,649.75 5,977,272.719 649,260.089 1.20 3,597.55 T 6,937.90 55.30 315.75 5,275.31 5,210.48 2,460.19 -2,665.16 5,977,288.225 649,244.360 0.74 3,619.64 6,964.70 55.33 315.80 5,290.56 5,225.73 2,475.98 -2,680.53 5,977,303.701 649,228.673 0.19 3,641.67 6,991.50 55.28 315.86 5,305.81 5,240.98 2,491.79 -2,695.88 5,977,319.191 649,213.004 0.26 3,663.71 7,018.40 55.37 315.88 5,321.12 5,256.29 2,507.66 -2,711.29 5,977,334.753 649,197.283 0.34 3,685.83 7,045.20 55.67 315.91 5,336.29 5,271.46 2,523.53 -2,726.66 5,977,350.300 649,181.590 1.12 3,707.92 7,072.40 55.78 315.95 5,351.61 5,286.78 2,539.68 -2,742.30 5,977,366.128 649,165.634 0.42 3,730.40 7,099.30 55.75 315.96 5,366.74 5,301.91 2,555.66 -2,757.76 5,977,381.795 649,149.853 0.12 3,752.64 7,126.10 55.82 315 99 5,381.81 5,316.98 2,571.60 -2,773.16 5,977,397.414 649,134.133 0.28 3,774.80 7,153.00 55.88 31605 5,396.91 5,332.08 2,587.62 -2,788.62 5,977,413.115 649,118.354 0.29 3,797.06 7,179.70 55.90 316.10 5,411.88 5,347.05 2,603.54 -2,803.95 5,977,428.722 649,102.700 0.17 3,819.16 7,206.30 55.75 316.11 5,426.82 5,361.99 2,619.40 -2,819.21 5,977,444.267 649,087.124 0.56 3,841.17 7,233.20 5565 316.07 5,441.98 5,377.15 2,635.41 -2,834.62 5,977,459.960 649,071.393 0.39 3,863.39 7/15/2019 9.01:31AM Page 14 COMPASS 5000. 1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48AP81 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 7,259.90 55.65 316.06 5,457.05 5,392.22 2,651.28 -2,849.92 5,977,475.520 649,055.780 0.03 3,885.44 7,286.60 55.58 316.03 5,472.13 5,407.30 2,667.14 -2,865.21 5,977,491.068 649,040.169 0.28 3,907.47 7,313.40 55.58 316.02 5,487.28 5,422.45 2,683.05 -2,880.56 5,977,506.662 649,024.501 0.03 3,929.58 7,340.10 55.48 315.99 5,502.39 5,437.56 2,698.89 -2,895.85 5,977,522.183 649,008.895 0.39 3,951.59 7,366.90 55.38 316.00 5,517.59 5,452.76 2,714.76 -2,911.18 5,977,537.741 648,993.246 0.37 3,973.66 7,393.80 55.48 316.01 5,532.86 5,468.03 2,730.70 -2,926.57 5,977,553.360 648,977.542 0.37 3,995.81 7,420.60 55.50 316.00 5,548.04 5,483.21 2,746.58 -2,941.91 5,977,568.932 648,961.885 0.08 4,017.89 7,447.50 55.42 316.03 5,563.29 5,498.46 2,762.53 -2,957.30 5,977,584.559 648,946.178 0.31 4,040.05 7,474.30 55.35 316.05 5,578.52 5,513.69 2,778.40 -2,972.61 5,977,600.121 648,930.550 0.27 4,062.10 7,501.00 55.40 316.05 5,593.69 5,528.86 2,794.22 -2,987.86 5,977,615.625 648,914.985 0.19 4,084.07 7,527.80 55.58 316.04 5,608.87 5,544.04 2,810.12 -3,003.18 5,977,631.208 648,899.339 0.67 4,106.16 7,554.50 55.67 316.07 5,623.95 5,559.12 2,825.99 -3,018.48 5,977,646.761 648,883.729 0.35 4,128.19 7,580.80 55.42 316.10 5,638.83 5,574.00 2,841.61 -3,033.52 5,977,662.074 648,868.375 0.96 4,149.88 7,607.10 55.23 316.14 5,653.79 5,588.96 2,857.20 -3,048.51 5,977,677.355 648,853.071 0.73 4,171.51 7,633.30 55.37 316.14 5,668.70 5,603.87 2,872.73 -3,063.44 5,977,692.580 648,837.835 0.53 4,193.05 7,659.60 55.33 316.12 5,683.66 5,618.83 2,888.33 -3,078.43 5,977,707.869 648,822.530 0.16 4,214.68 7,685.90 55.08 316.05 5,698.66 5,633.83 2,903.89 -3,093.41 5,977,723.119 648,807.239 0.98 4,236.28 7,712.20 54.88 315.97 5,713.76 5,648.93 2,919.38 -3,108.37 5,977,738.308 648,791.970 0.80 4,257.82 7,738.60 54.80 315.93 5,728.96 5,664.13 2,934.89 -3,123.38 5,977,753.512 648,776.653 0.33 4,279.40 7,765.10 54.88 315.93 5,744.22 5,679.39 2,950.46 -3,138.44 5,977,768.768 648,761.273 0.30 4,301.07 7,791.50 55.03 315.94 5,759.38 5,694.55 2,965.99 -3,153.48 5,977,783.990 648,745.931 0.57 4,322.68 7,817.90 54.98 315.94 5,774.52 5,709.69 2,981.53 -3,168.52 5,977,799.222 648,730.580 0.19 4,344.31 7,844.10 54.78 316.00 5,789.59 5,724.76 2,996.94 -3,183.41 5,977,814.324 648,715.378 0.79 4,365.74 7,870.50 54.42 316.04 5,804.89 5,740.06 3,012.42 -3,198.35 5,977,829.502 648,700.125 1.37 4,387.25 7,897.40 53.92 316.06 5,820.63 5,755.80 3,028.13 -3,213.49 5,977,844.892 648,684.674 1.86 4,409.06 7,924.40 53.65 316.14 5,836.58 5,771.75 3,043.82 -3,228.59 5,977,860.278 648,669.256 1.03 4,430.85 7,951.20 53.57 316.19 5,852.48 5,787.65 3,059.38 -3,243.54 5,977,875.533 648,654.003 0.33 4,452.42 7/15/2019 9:01:31AM Page 15 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,978.40 53.47 316.14 5,868.66 5,803.83 3,075.16 -3,258.68 5,977,890.998 648,638.540 0.40 4,474.29 8,005.50 53.30 315.96 5,884.82 5,819.99 3,090.82 -3,273.78 5,977,906.348 648,623.130 0.82 4,496.04 8,032.50 53.27 315.79 5,900.96 5,836.13 3,106.36 -3,288.85 5,977,921.574 648,607.751 0.52 4,517.69 8,059.50 53.30 315.61 5,917.10 5,852.27 3,121.85 -3,303.97 5,977,936.754 648,592.325 0.55 4,539.33 8,086.90 53.23 315.46 5,933.49 5,868.66 3,137.52 -3,319.35 5,977,952.109 648,576.630 0.51 4,561.28 8,114.10 53.13 315.42 5,949.79 5,884.96 3,153.03 -3,334.62 5,977,967.310 648,561.042 0.39 4,583.06 8,141.40 53.12 315.42 5,966.17 5,901.34 3,168.59 -3,349.95 5,977,982.550 648,545.403 0.04 4,604.89 8,168.60 53.03 315.49 5,982.51 5,917.68 3,184.09 -3,365.21 5,977,997.734 648,529.840 0.39 4,626.63 8,195.80 52.95 315.57 5,998.89 5,934.06 3,199.59 -3,380.42 5,978,012.921 648,514.314 0.38 4,648.35 8,223.20 52.90 315.56 6,015.41 5,950.58 3,215.20 -3,395.73 5,978,028.216 648,498.697 0.18 4,670.21 8,250.30 52.82 315.49 6,031.77 5,966.94 3,230.61 -3,410.86 5,978,043.320 648,483.254 0.36 4,691.81 8,277.20 52.73 315.42 6,048.04 5,983.21 3,245.88 -3,425.89 5,978,058.277 648,467.924 0.39 4,713.23 8,303.90 52.58 315.36 6,064.24 5,999.41 3,260.99 -3,440.79 5,978,073.082 648,452.715 0.59 4,734.45 8,330.80 52.43 315.32 6,080.61 6,015.78 3,276.17 -3,455.80 5,978,087.954 648,437.410 0.57 4,755.79 8,357.60 52.35 315.35 6,096.97 6,032.14 3,291.27 -3,470.72 5,978,102.748 648,422.184 0.31 4,777.02 8,384.50 52.08 315.41 6,113.45 6,048.62 3,306.40 -3,485.65 5,978,117.573 648,406.949 1.02 4,798.27 8,411.40 51.75 315.53 6,130.04 6,065.21 3,321.49 -3,500.50 5,978,132.361 648,391.799 1.28 4,819.44 8,438.30 51.50 315.69 6,146.74 6,081.91 3,336.56 -3,515.25 5,978,147.128 648,376.745 1.04 4,840.53 8,465.10 51.23 315.79 6,163.47 6,098.64 3,351.56 -3,529.86 5,978,161.821 648,361.835 1.05 4,861.46 8,491.90 50.90 315.89 6,180.32 6,115.49 3,366.51 -3,544.39 5,978,176.477 648,347.013 1.27 4,882.31 8,518.70 50.55 315.94 6,197.28 6,132.45 3,381.41 -3,558.82 5,978,191.083 648,332.281 1.31 4,903.05 8,545.50 50.47 315.90 6,214.32 6,149.49 3,396.27 -3,573.21 5,978,205.645 648,317.596 0.32 4,923.74 8,572.40 50.52 315.81 6,231.44 6,166.61 3,411.16 -3,587.66 5,978,220.241 648,302.843 0.32 4,944.49 8,599.20 50.52 315.70 6,248.48 6,183.65 3,425.98 -3,602.10 5,978,234.763 648,288.114 0.32 4,965.17 8,626.10 50.52 315.60 6,265.58 6,200.75 3,440.83 -3,616.61 5,978,249.312 648,273.303 0.29 4,985.93 8,652.90 50.47 315.49 6,282.63 6,217.80 3,455.59 -3,631.09 5,978,263.774 648,258.526 0.37 5,006.61 8,679.80 50.37 315.42 6,299.77 6,234.94 3,470.37 -3,645.64 5,978,278.252 648,243.687 0.42 5,027.34 7/15/2019 9:01:31AM Page 16 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-46 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,706.70 50.38 315.36 6,316.92 6,252.09 3,485.12 -3,660.19 5,978,292.703 648,228.842 0.18 5,048.06 8,733.60 50.48 315.30 6,334.06 6,269.23 3,499.86 -3,674.76 5,978,307.150 648,213.969 0.41 5,068.79 8,760.50 50.52 315.25 6,351.17 6,286.34 3,514.61 -3,689.37 5,978,321.597 648,199.068 0.21 5,089.54 8,787.29 50.47 315.18 6,368.21 6,303.38 3,529.28 -3,703.93 5,978,335.969 648,184.213 0.27 5,110.21 8,814.10 50.40 315.08 6,385.29 6,320.46 3,543.93 -3,718.51 5,978,350.317 648,169.339 0.39 5,130.87 8,840.80 50.35 315.01 6,402.32 6,337.49 3,558.48 -3,733.04 5,978,364.572 648,154.518 0.28 5,151.43 8,867.60 50.33 314.95 6,419.42 6,354.59 3,573.07 -3,747.64 5,978,378.856 648,139.633 0.19 5,172.06 8,894.50 50.33 314.90 6,436.59 6,371.76 3,587.69 -3,762.30 5,978,393.177 648,124.680 0.14 5,192.76 8,921.40 50.32 314.85 6,453.77 6,388.94 3,602.30 -3,776.97 5,978,407.484 648,109.716 0.15 5,213.45 8,947.90 50.33 314.77 6,470.69 6,405.86 3,616.67 -3,791.44 5,978,421.561 648,094.959 0.24 5,233.84 8,974.39 50.42 314.68 6,487.58 6,422.75 3,631.03 -3,805.94 5,978,435.621 648,080.175 0.43 5,254.24 9,000.79 50.47 314.63 6,504.39 6,439.56 3,645.34 -3,820.42 5,978,449.630 648,065.410 0.24 5,274.58 9,027.20 50.42 314.58 6,521.21 6,456.38 3,659.63 -3,834.91 5,978,463.631 648,050.627 0.24 5,294.94 9,053.89 50.47 314.51 6,538.21 6,473.38 3,674.07 -3,849.58 5,978,477.765 648,035.672 0.28 5,315.50 9,080.29 50.40 314.42 6,555.02 6,490.19 3,688.32 -3,864.10 5,978,491.722 648,020.863 0.37 5,335.84 9,106.70 50.32 314.34 6,571.87 6,507.04 3,702.55 -3,878.64 5,978,505.648 648,006.043 0.38 5,356.17 9,132.89 50.40 314.30 6,588.58 6,523.75 3,716.64 -3,893.07 5,978,519.442 647,991.332 0.33 5,376.32 9,159.20 50.35 314.23 6,605.36 6,540.53 3,730.78 -3,907.58 5,978,533.289 647,976.538 0.28 5,396.58 9,185.60 50.23 314.16 6,622.23 6,557.40 3,744.94 -3,922.14 5,978,547.147 647,961.694 0.50 5,416.87 9,211.90 50.25 314.09 6,639.05 6,574.22 3,759.02 -3,936.66 5,978,560.926 647,946.900 0.22 5,437.07 9,238.29 50.38 314.05 6,655.90 6,591.07 3,773.14 -3,951.25 5,978,574.751 647,932.026 0.51 5,457.36 9,264.79 50.32 313.99 6,672.81 6,607.98 3,787.32 -3,965.92 5,978,588.629 647,917.070 0.29 5,477.75 9,291.20 50.30 313.92 6,689.68 6,624.85 3,801.43 -3,980.55 5,978,602.434 647,902.158 0.22 5,498.06 9,317.70 50.30 313.87 6,706.60 6,641.77 3,815.56 -3,995.24 5,978,616.269 647,887.183 0.15 5,518.43 9,344.10 50.22 313.85 6,723.48 6,658.65 3,829.63 -4,009.88 5,978,630.035 647,872.265 0.31 5,538.71 9,370.60 50.18 313.82 6,740.44 6,675.61 3,843.73 -4,024.57 5,978,643.834 647,857.298 0.17 5,559.05 9,397.10 50.13 313.76 6,757.42 6,692.59 3,857.81 -4,039.25 5,978,657.612 647,842.329 0.26 5,579.37 7/15/2019 9:01:31AM Page 17 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48AP61 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9,423.60 50.07 313.74 6,774.42 6,709.59 3,871.87 -4,053.94 5,978,671.369 647,827.362 0.23 5,599.68 9,449.89 50.05 313.70 6,791.30 6,726.47 3,885.80 -4,068.51 5,978,665.001 647,812.516 0.14 5,619.81 9,476.20 50.03 313.66 6,808.20 6,743.37 3,899.73 -4,083.09 5,978,698.629 647,797.654 0.14 5,639.96 9,502.70 49.85 313.61 6,825.25 6,760.42 3,913.72 -4,097.77 5,978,712.324 647,782.695 0.69 5,660.22 9,529.20 49.72 313.56 6,842.36 6,777.53 3,927.68 -4,112.43 5,978,725.975 647,767.758 0.51 5,680.43 9,555.70 49.70 313.49 6,859.50 6,794.67 3,941.60 -4,127.08 5,978,739.594 647,752.824 0.22 5,700.62 9,582.29 49.58 313.42 6,876.72 6,811.89 3,955.53 -4,141.79 5,978,753.228 647,737.837 0.49 5,720.85 9,608.49 49.52 313.34 6,893.71 6,828.88 3,969.23 -4,156.28 5,978,766.624 647,723.073 0.33 5,740.76 9,634.60 49.50 313.28 6,910.67 6,845.84 3,982.85 -4,170.73 5,978,779.948 647,708.352 0.19 5,760.59 9,660.70 49.25 313.29 6,927.66 6,862.83 3,996.43 -4,185.15 5,978,793.234 647,693.660 0.96 5,780.37 9,686.70 49.05 313.34 6,944.67 6,879.84 4,009.92 -4,199.46 5,978,806.432 647,679.081 0.78 5,800.01 9,712.70 48.88 313.35 6,961.74 6,896.91 4,023.38 -4,213.73 5,978,819.601 647,664.550 0.65 5,819.60 9,738.79 48.63 313.31 6,978.94 6,914.11 4,036.84 -4,228.00 5,978,832.769 647,650.011 0.97 5,839.19 9,764.60 48.52 313.33 6,996.02 6,931.19 4,050.12 -4,242.07 5,978,845.758 647,635.666 0.43 5,856.51 9,790.39 48.33 313.29 7,013.13 6,948.30 4,063.35 -4,256.11 5,978,858.704 647,621.363 0.75 5,877.78 9,816.39 48.02 313.24 7,030.47 6,965.64 4,076.63 -4,270.22 5,978,871.693 647,606.990 1.20 5,897.12 9,842.39 47.73 313.29 7,047.91 6,983.08 4,089.85 -4,284.26 5,978,884.621 647,592.684 1.12 5,916.38 9,868.39 47.48 313.33 7,065.44 7,000.61 4,103.02 -4,298.24 5,978,897.506 647,578.449 0.97 5,935.55 9,894.39 47.23 313.39 7,083.05 7,018.22 4,116.15 -4,312.14 5,976,910.351 647,564.282 0.98 5,954.65 9,920.39 47.03 313.52 7,100.74 7,035.91 4,129.26 -4,325.97 5,978,923.173 647,550.187 0.85 5,973.68 9,946.29 46.97 313.60 7,118.40 7,053.57 4,142.31 -4,339.70 5,978,935.944 647,536.200 0.32 5,992.60 9,972.29 46.82 313.65 7,136.17 7,071.34 4,155.41 -4,353.44 5,978,948.759 647,522.198 0.59 6,011.56 9,998.29 46.55 313.72 7,154.01 7,089.18 4,168.47 -4,367.12 5,978,961.544 647,508.257 1.06 6,030.46 10,024.29 46.32 313.80 7,171.93 7,107.10 4,181.50 -4,380.73 5,978,974.295 647,494.390 0.91 6,049.28 10,050.29 46.05 313.89 7,189.93 7,125.10 4,194.50 -4,394.26 5,978,987.013 647,480.599 1.07 6,068.02 10,076.29 45.87 313.97 7,208.00 7,143.17 4,207.47 -4,407.72 5,978,999.703 647,466.880 0.73 6,086.69 10,102.10 45.68 313.97 7,226.00 7,161.17 4,220.31 -4,421.03 5,979,012.271 647,453.312 0.74 6,105.17 7/15/2019 9:01.31AM Page 18 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft (usft) 10,128.00 45.35 313.98 7,244.15 7,179.32 4,233.14 -4,434.33 5,979,024.828 647,439.758 1.27 6,123.63 10,154.00 45.02 314.03 7,262.48 7,197.65 4,245.95 -4,447.59 5,979,037.369 647,426.236 1.28 6,142.06 10,180.00 44.93 314.08 7,280.87 7,216.04 4,258.73 -4,460.80 5,979,049.876 647,412.774 0.37 6,160.42 10,206.00 44.90 314.14 7,299.28 7,234.45 4,271.51 -4,473.98 5,979,062.383 647,399.338 0.20 6,178.77 10,232.00 44.92 314.15 7,317.69 7,252.86 4,284.29 -4,487.15 5,979,074.897 647,385.911 0.08 6,197.11 10,258.00 45.00 314.09 7,336.09 7,271.26 4,297.08 -4,500.34 5,979,087.416 647,372.466 0.35 6,215.47 10,283.49 44.90 314.07 7,354.13 7,289.30 4,309.61 -4,513.28 5,979,099.678 647,359.279 0.40 6,233.46 10,309.10 44.80 314.14 7,372.29 7,307.46 4,322.18 -4,526.25 5,979,111.982 647,346.059 0.44 6,251.51 10,334.60 44.82 314.22 7,390.38 7,325.55 4,334.70 -4,539.14 5,979,124.242 647,332.920 0.23 6,269.47 10,360.10 44.78 314.29 7,408.47 7,343.64 4,347.24 -4,552.01 5,979,136.517 647,319.800 0.25 6,287.42 10,385.70 44.75 314.31 7,426.65 7,361.82 4,359.83 -4,564.91 5,979,148.843 647,306.647 0.13 6,305.44 10,411.10 44.78 314.30 7,444.68 7,379.85 4,372.33 -4,577.71 5,979,161.073 647,293.597 0.12 6,323.31 10,436.39 44.80 314.24 7,462.63 7,397.80 4,384.76 -4,590.47 5,979,173.248 647,280.590 0.18 6,341.12 10,461.90 44.98 314.12 7,480.70 7,415.87 4,397.31 -4,603.38 5,979,185.530 647,267.428 0.78 6,359.11 10,487.40 45.03 314.16 7,498.73 7,433.90 4,409.87 -4,616.32 5,979,197.823 647,254.236 0.23 6,377.13 10,513.20 44.95 314.30 7,516.98 7,452.15 4,422.59 -4,629.39 5,979,210.278 647,240.912 0.49 6,395.35 10,538.70 45.03 314.29 7,535.01 7,470.18 4,435.18 -4,642.29 5,979,222.603 647,227.757 0.31 6,413.37 10,564.29 45.22 314.17 7,553.07 7,488.24 4,447.83 -4,655.29 5,979,234.985 647,214.510 0.81 6,431.49 10,589.79 45.38 314.11 7,571.01 7,506.18 4,460.46 -4,668.29 5,979,247.341 647,201.251 0.65 6,449.60 10,615.29 45.50 314.07 7,588.90 7,524.07 4,473.10 -4,681.34 5,979,259.715 647,187.948 0.48 6,467.76 10,640.89 45.72 314.03 7,606.81 7,541.98 4,485.82 -4,694.49 5,979,272.164 647,174.546 0.87 6,486.04 10,666.49 45.95 314.03 7,624.64 7,559.81 4,498.58 -4,707.70 5,979,284.656 647,161.088 0.90 6,504.38 10,691.99 46.10 314.04 7,642.35 7,577.52 4,511.34 -4,720.89 5,979,297.141 647,147.640 0.59 6,522.72 10,717.49 46.25 314.04 7,660.01 7,595.18 4,524.12 -4,734.11 5,979,309.658 647,134.160 0.59 6,541.10 10,742.89 46.38 314.08 7,677.55 7,612.72 4,536.90 -4,747.31 5,979,322.161 647,120.705 0.52 6,559.46 10,768.39 46.50 314.11 7,695.12 7,630.29 4,549.76 -4,760.58 5,979,334.747 647,107.177 0.48 6,577.92 10,794.09 46.58 314.11 7,712.80 7,647.97 4,562.74 -4,773.98 5,979,347.456 647,093.524 0.31 6,596.56 7/15/2019 9:01:31AM Page 19 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,819.70 46.70 314 19 7,730.38 7,665.55 4,575.71 -4,787.34 5,979,360.151 647,079.905 0.52 6.615.16- ,615.16-10,845.20 10,845.20 46.83 314.30 7,747.85 7,683.02 4,588.67 -4,800.65 5,979,372.840 647,066.337 0.60 6,633.731 10,870.89 47.00 314.38 7,765.40 7,700.57 4,601.79 -4,814.07 5,979,385.678 647,052.656 0.70 6,652.48 10,896.49 47.07 314.51 7,782.85 7,718.02 4,614.90 -4,827.44 5,979,398.521 647,039.020 0.46 6,671.20 10,921.79 47.13 314.67 7,800.07 7,735.24 4,627.91 -4,840.64 5,979,411.260 647,025.562 0.52 6,689.73 10,946.99 47.37 314.78 7,817.18 7,752.35 4,640.94 -4,853.79 5,979,424.012 647,012.154 1.00 6,708.22 10,972.19 47.48 314.85 7,834.22 7,769.39 4,654.02 -4,866.95 5,979,436.821 646,998.728 0.48 6,726.78 10,997.29 47.55 314.89 7,851.18 7,786.35 4,667.07 -4,880.07 5,979,449.611 646,985.349 0.30 6,745.281 11,022.39 47.72 314.96 7,868.09 7,803.26 4,680.17 -4,893.20 5,979,462.438 646,971.956 0.71 6,763.82 11,047.29 47.82 315.03 7,884.83 7,820.00 4,693.21 -4,906.24 5,979,475.206 646,958.658 0.45 6,782.25 11,072.29 47.97 315.02 7,901.59 7,836.76 4,706.33 -4,919.35 5,979,488.057 646,945.286 0.60 6,800.79 11,097.39 48.12 315.02 7,918.37 7,853.54 4,719.53 -4,932.54 5,979,500.990 646,931.828 0.60 6,819.45 11,122.49 48.23 315.01 7,935.11 7,870.28 4,732.76 -4,945.76 5,979,513.948 646,918.341 0.44 6,838.15 11,147.49 48.38 314.95 7,951.74 7,886.91 4,745.96 -4,958.97 5,979,526.872 646,904.873 0.63 6,856.81 11,172.60 48.43 314.90 7,968.41 7,903.58 4,759.22 -4,972.26 5,979,539.860 646,891.312 0.25 6,875.59 11,197.60 48.40 314.86 7,985.00 7,920.17 4,772.41 -4,985.51 5,979,552.782 646,877.798 0.17 6,894.28 11,222.60 48.37 314.78 8,001.60 7,936.77 4,785.59 -4,998.77 5,979,565.684 646,864.277 0.27 6,912.96 11,247.59 48.35 314.72 8,018.21 7,953.38 4,798.73 -5,012.04 5,979,578.560 646,850.751 0.20 6,931.63 11,272.70 48.30 314.69 8,034.90 7,970.07 4,811.93 -5,025.37 5,979,591.480 646,837.157 0.22 6,950.38 11,297.69 48.33 314.65 8,051.52 7,986.69 4,825.05 -5,038.64 5,979,604.328 646,823.623 0.17 6,969.03 11,322.70 48.37 314.65 8,068.14 8,003.31 4,838.18 -5,051.93 5,979,617.188 646,810.065 0.16 6,987.71 11,347.60 48.38 314.66 8,084.68 8,019.85 4,851.26 -5,065.17 5,979,629.998 646,796.564 0.05 7,006.32 11,372.49 48.45 314.67 8,101.20 8,036.37 4,864.35 -5,078.41 5,979,642.813 646,783.061 0.28 7,024.93 11,397.60 48.43 314.73 8,117.86 8,053.03 4,877.57 -5,091.77 5,979,655.755 646,769.442 0.20 7,043.71 11,422.60 48.37 31484 8,134.46 8,069.63 4,890.74 -5,105.04 5,979,668.652 646,755.910 0.41 7,062.40 11,447.69 48.40 314.99 8,151.12 8,086.29 4,903.98 -5,118.32 5,979,681.623 646,742.362 046 7,081.15 11,472.79 48.35 315.19 8,167.79 8,102.96 4,917.27 -5,131.57 5,979,694.639 646,728.850 0.63 7,099.90 7/15/2019 9:01:31AM Page 20 COMPASS 5000.1 Build 81D WEI BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,497.79 48.23 315.38 8,184.43 8,119.60 4,930.53 -5,144.70 5,979,707.631 646,715.454 0.74 7,118.56 11,522.89 48.10 315.55 8,201.17 8,136.34 4,943.86 -5,157.81 5,979,720.692 646,702.071 0.72 7,137.26 11,547.79 47.92 315.73 8,217.83 8,153.00 4,957.09 -5,170.75 5,979,733.658 646,688.867 0.90 7,155.77 11,572.49 47.78 315.92 8,234.40 8,169.57 4,970.23 -5,183.52 5,979,746.530 646,675.844 0.80 7,174.08 11,597.10 47.68 316.10 8,250.96 8,186.13 4,983.33 -5,196.16 5,979,759.372 646,662.934 0.68 7,192.29 11,621.60 47.60 316.31 8,267.46 8,202.63 4,996.40 -5,208.69 5,979,772.182 646,650.143 0.71 7,210.39 11,646.10 47.52 316.54 8,284.00 8,219.17 5,009.50 -5,221.16 5,979,785.025 646,637.418 0.77 7,228.48 11,670.60 47.40 316.73 8,300.56 8,235.73 5,022.62 -5,233.55 5,979,797.893 646,624.761 0.75 7,246.53 11,694.99 47.40 316.81 8,317.07 8,252.24 5,035.70 -5,245.85 5,979,810.721 646,612.202 0.24 7,264.48 11,719.60 47.45 316.83 8,333.72 8,268.89 5,048.92 -5,258.25 5,979,823.681 646,599.537 0.21 7,282.60 11,744.20 47.40 316.81 8,350.36 8,285.53 5,062.12 -5,270.64 5,979,836.636 646,586.876 0.21 7,300.72 11,768.79 47.47 316.81 8,367.00 8,302.17 5,075.33 -5,283.04 5,979,849.586 646,574.217 0.28 7,318.83 11,793.39 47.53 316.85 8,383.62 8,318.79 5,088.56 -5,295.45 5,979,862.559 646,561.543 0.27 7,336.96 11,817.99 47.57 316.90 8,400.22 8,335.39 5,101.81 -5,307.86 5,979,875.552 646,548.870 0.22 7,355.11 11,842.60 47.53 316.93 8,416.83 8,352.00 5,115.07 -5,320.26 5,979,888.559 646,536.201 0.19 7,373.27 11,867.20 47.43 316.94 8,433.46 8,368.63 5,128.31 -5,332.64 5,979,901.550 646,523.555 0.41 7,391.40 11,891.79 47.37 316.97 8,450.10 8,385.27 5,141.54 -5,345.00 5,979,914.525 646,510.936 0.26 7,409.50 11,916.39 47.37 316.98 8,466.76 8,401.93 5,154.77 -5,357.35 5,979,927.502 646,498.322 0.03 7,427.60 11,940.89 47.33 316.98 8,483.36 8,418.53 5,167.95 -5,369.64 5,979,940.424 646,485.764 0.16 7,445.62 11,965.60 47.23 316.98 8,500.13 8,435.30 5,181.22 -5,382.03 5,979,953.442 646,473.113 0.40 7,463.77 11,990.29 47.30 316.95 8,516.88 8,452.05 5,194.48 -5,394.40 5,979,966.443 646,460.472 0.30 7,481.91 12,014.60 47.32 317.02 8,533.36 8,468.53 5,207.54 -5,406.59 5,979,979.257 646,448.021 0.23 7,499.77 12,034.39 47.32 317.12 8,546.78 8,481.95 5,218.19 -5,416.50 5,979,989.706 646,437.898 0.37 7,514.32 12,048.10 47.33 317.17 8,556.07 8,491.24 5,225.58 -5,423.36 5,979,996.954 646,430.895 0.28 7,524.40 12,061.89 47.30 317.27 8,565.42 8,500.59 5,233.02 -5,430.24 5,980,004.253 646,423.861 0.58 7,534.54 12,075.70 47.35 317.33 8,574.78 8,509.95 5,240.48 -5,437.13 5,980,011.573 646,416.826 0.48 7,544.69 12,089.39 47.37 317.34 8,584.06 8,519.23 5,247.89 -5,443.95 5,980,018.838 646,409.853 0.16 7,554.76 7/15/2019 9:01.31AM Page 21 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48APB1 Survey Calculation Method: Minimum Curvature Design: F-48APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,103.20 47.30 317.45 8,593.41 8,528.58 5,255.36 -5,450.83 5,980,026.171 646,402.829 0.77 7,564.91 12,116.99 47.40 317.53 8,602.76 8,537.93 5,262.84 -5,457.68 5,980,033.506 646,395.826 0.84 7,575.05 12,130.79 47.52 317.57 8,612.09 8,547.26 5,270.34 -5,464.54 5,980,040.868 646,388.813 0.90 7,585.22 12,144.59 47.47 317.78 8,621.41 8,556.58 5,277.87 -5,471.39 5,980,048.249 646,381.813 1.18 7,595.39 12,158.29 47.48 318.03 8,630.67 8,565.84 5,285.36 -5,478.16 5,980,055.602 646,374.894 1.35 7,605.48 12,171.89 47.62 318.26 8,639.85 8,575.02 5,292.83 -5,484.86 5,980,062.938 646,368.049 1.62 7,615.51 12,185.49 47.57 318.43 8,649.02 8,584.19 5,300.34 -5,491.53 5,980,070.304 646,361.224 0.99 7,625.55 12,199.09 47.32 318.53 8,658.22 8,593.39 5,307.84 -5,498.17 5,980,077.668 646,354.433 1.92 7,635.56 12,212.59 47.25 318.52 8,667.38 8,602.55 5,315.27 -5,504.74 5,980,084.965 646,347.715 0.52 7,645.47 12,226.19 47.38 318.47 8,676.60 8,611.77 5,322.75 -5,511.37 5,980,092.315 646,340.940 0.99 7,655.46 12,239.79 47.40 318.59 8,685.81 8,620.98 5,330.25 -5,518.00 5,980,099.679 646,334.162 0.67 7,665.46 12,253.29 47.37 318.76 8,694.95 8,630.12 5,337.72 -5,524.56 5,980,107.005 646,327.452 0.95 7,675.39 12,266.79 47.27 318.84 8,704.10 8,639.27 5,345.18 -5,531.09 5,980,114.337 646,320.765 0.86 7,685.31 12,280.39 47.30 318.96 8,713.32 8,648.49 5,352.71 -5,537.66 5,980,121.732 646,314.046 0.68 7,695.29 12,293.99 47.42 319.03 8,722.54 8,657.71 5,360.26 -5,544.23 5,980,129.147 646,307.330 0.96 7,705.28 12,307.49 47.28 319.13 8,731.68 8,666.85 5,367.77 -5,550.73 5,980,136.516 646,300.676 1.17 7,715.20 12,320.99 47.18 319.31 8,740.85 8,676.02 5,375.27 -5,557.20 5,980,143.887 646,294.053 1.23 7,725.10 12,334.49 47.30 319.41 8,750.02 8,685.19 5,382.79 -5,563.66 5,980,151.275 646,287.447 1.04 7,735.00 12,347.99 47.45 319.48 8,759.16 8,694.33 5,390.34 -5,570.12 5,980,158.689 646,280.838 1.17 7,744.92 12,361.49 47.43 319.59 8,768.29 8,703.46 5,397.90 -5,576.57 5,980,166.122 646,274.233 0.62 7,754.85 12,374.99 47.37 319.77 8,777.43 8,712.60 5,405.48 -5,583.00 5,980,173.566 646,267.651 1.08 7,764.77 12,388.49 47.27 319.92 8,786.58 8,721.75 5,413.07 -5,589.40 5,980,181.019 646,261.099 1.10 7,774.67 12,401.99 47.32 320.00 8,795.73 8,730.90 5,420.66 -5,595.78 5,980,188.483 646,254.565 0.57 7,784.57 12,415.49 47.43 320.04 8,804.88 8,740.05 5,428.27 -5,602.16 5,980,195.963 646,248.030 0.84 7,794.49 12,428.99 47.37 320.10 8,814.01 8,749.18 5,435.89 -5,608.54 5,980,203.452 646,241.499 0.55 7,804.40 12,442.39 47.25 320.23 8,823.10 8,758.27 5,443.46 -5,614.85 5,980,210.885 646,235.038 1.14 7,814.23 12,455.79 47.23 320.34 8,832.20 8,767.37 5,451.02 -5,621.14 5,980,218.324 646,228.600 0.62 7,824.05 7/15/2019 9.01:31AM Page 22 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: F Local Co-ordinate Reference: Well: F-48 Wellbore: F-48APB1 Design: F-48APB1 Survey TVD Reference: MD Inc KB @ 64.83usft (ORIG KELLY BUSHING) (usft) (°) 12,469.19 47.37 12,482.59 47.57 12,495.89 47.73 Tie -in -Point 12,496.00 47.73 KOP - Top of Whipstock North Reference: 12, 520.01 50.40 Interpolated Azimuth 12,550.01 57.97 Interpolated Azimuth 12,580.24 66.90 First Clean Survey 12,610.27 76.17 12,641.60 86.89 12,671.27 89.23 12,700.19 89.75 12,730.11 89.69 12,760.31 89.23 12,790.45 90.46 12,820.28 90.25 12,850.29 94.09 12,875.09 96.99 12,910.28 98.69 12,970.00 98.69 Projection to TD (usft) BP Final Survey Report 7/15/2019 9:01:31AM Page 23 COMPASS 5000.1 Build 81D Local Co-ordinate Reference: Well F-48 TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 320.39 8,841.28 8,776.45 5,458.61 -5,627.42 5,980,225.778 646,222.167 1.08 7,833.87 320.42 8,850.34 8,785.51 5,466.22 -5,633.71 5,980,233.258 646,215.720 1.50 7,843.72 320.41 8,859.30 8,794.47 5,473.79 -5,639.98 5,980,240.704 646,209.305 1.20 7,853.53 320.41 8,859.38 8,794.55 5,473.85 -5,640.03 5,980,240.766 646,209.252 0.00 7,853.61 324.72 8,875.11 8,810.28 5,488.26 -5,651.04 5,980,254.945 646,197.956 17.53 7,871.63 329.32 8,892.66 8,827.83 5,508.67 -5,664.22 5,980,275.081 646,184.358 28.12 7,895.50 333.34 8,906.64 8,841.81 5,532.17 -5,677.03 5,980,298.316 646,171.079 31.80 7,921.35 334.67 8,916.14 8,851.31 5,557.75 -5,689.49 5,980,323.634 646,158.102 31.15 7,948.46 339.58 8,920.75 8,855.92 5,586.26 -5,701.50 5,980,351.890 646,145.520 37.55 7,977.38 346.48 8,921.75 8,856.92 5,614.60 -5,710.15 5,980,380.050 646,136.300 24.54 8,003.87 355.02 8,922.01 8,857.18 5,643.12 -5,714.79 5,980,408.464 646,131.080 29.58 8,027.71 1.82 8,922.16 8,857.33 5,673.01 -5,715.62 5,980,438.330 646,129.650 22.73 8,049.92 12.90 8,922.44 8,857.61 5,702.91 -5,711.75 5,980,468.303 646,132.905 36.72 8,068.90 21.61 8,922.53 8,857.70 5,731.66 -5,702.82 5,980,497.231 646,141.251 29.18 8,083.56 28.79 8,922.34 8,857.51 5,758.64 -5,690.13 5,980,524.453 646,153.394 24.08 8,094.33 35.92 8,921.20 8,856.37 5,783.95 -5,674.10 5,980,550.084 646,168.910 26.97 8,101.59 44.60 8,918.80 8,853.97 5,802.77 -5,658.17 5,980,569.221 646,184.455 36.74 8,104.22 57.58 8,913.98 8,849.15 5,824.62 -5,631.10 5,980,591.617 646,211.065 36.86 8,101.37 57.58 8,904.96 8,840.13 5,856.27 -5,581.27 5,980,624.267 646,260.243 0.00 8,089.90 7/15/2019 9:01:31AM Page 23 COMPASS 5000.1 Build 81D North America - ALASKA - BP PBU F-48 F -48A 500292218701 Design: F -48A Final Survey Report 24 July, 2019 Company: North America - ALASKA - BP Project: PBU Site: F Well: F-48 Wellbore: F -48A Design: F -48A BP Final Survey Report Local Coordinate Reference: Well F-48 TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-UsaAK [4267*15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site F, TR -11-13 Site Position: 650,960.700 usft From: Map Position Uncertainty: 0.00 usft Well F-48, F-48 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore F -48A Magnetics Model Name Sample Date BGGM2018 7/1/2019 Design F -48A Audit Notes: Northing: 5,972,527.290 usft Easting: 650,960.700 usft Slot Radius: 0.000 in Northing: 5,974,882.730 usft Easting: 651,958.630 usft Wellhead Elevation: 35.71 usft Declination 16.78 Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) +N/ -S (usft) (usft) -3.48 0.00 Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: Dip Angle Field Strength (°) (nT) 80.94 57,422 Tie On Depth: 12,455.79 +E/ -W Direction (usft) (I 0.00 316.60 70' 19' 55.283 N 148° 46'31.468 W 1.15 ° 70° 20' 18.248 N 148'46'0.940 W 35.21 usft 7/24/2019 10.49.52AM Page 2 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A (usft) Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 7/24/2019 (usft) (usft) From To (usft) (usft) (usft) Survey (Wellbore) Tool Name Description 0.00 50.00 12,455.79 1 : Schlumberger GCT multishot (F-48) GCT -MS Schlumberger GCT multishot 12,467.00 13,000.00 Survey #1 (F -48A) MWD MWD - Standard 0.00 Survey MD Inc Azi TVD TVDSS NIS ENV Northing Easting DLeg (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 29.12 0.00 0.00 29.12 -35.71 0.00 0.00 5,974,882.730 651,958.630 0.00 50.00 0.00 0.00 50.00 -14.83 0.00 0.00 5,974,882.730 651,958.630 0.00 58.60 0.23 150.58 58.60 -6.23 -0.02 0.01 5,974,882.715 651,958.639 2.67 71.80 0.20 142.04 71.80 6.97 -0.06 0.04 5,974,882.674 651,958.667 0.33 85.20 0.15 132.33 85.20 20.37 -0.09 0.06 5,974,882.645 651,958.695 0.43 98.70 0.18 128.62 98.70 33.87 -0.11 0.09 5,974,882.620 651,958.725 0.24 112.30 0.25 125.77 112.30 47.47 -0.14 0.13 5,974,882.590 651,958.766 0.52 125.90 0.27 116.50 125.90 61.07 -0.17 0.19 5,974,882.560 651,958.820 0.34 139.60 0.27 111.09 139.60 74.77 -0.20 0.25 5,974,882.535 651,958.879 0.19 153.20 0.25 110.68 153.20 88.37 -0.22 0.30 5,974,882.514 651,958.937 0.15 166.90 0.25 113.19 166.90 102.07 -0.24 0.36 5,974,882.493 651,958.993 0.08 180.60 0.28 124.11 180.60 115.77 -0.27 0.41 5,974,882.464 651,959.049 0.43 194.20 0.37 136.36 194.20 129.37 -0.33 0.47 5,974,882.414 651,959.108 0.83 207.90 0.40 143.11 207.90 143.07 -0.40 0.53 5,974,882.345 651,959.168 0.40 221.60 0.38 148.25 221.60 156.77 -0.47 0.58 5,974,882.270 651,959.223 0.29 235.20 0.38 153.97 235.20 170.37 -0.55 0.63 5,974,882.192 651,959.268 0.28 248.80 0.32 172.38 248.80 183.97 -0.63 0.65 5,974,882.114 651,959.294 0.93 262.50 0.22 224.76 262.50 197.67 -0.69 0.64 5,974,882.057 651,959.282 1.86 276.10 0.22 272.07 276.10 211.27 -0.70 0.59 5,974,882.039 651,959.238 1.30 289.80 0.23 283.78 289.80 224.97 -0.70 0.54 5,974,882.045 651,959.185 0.34 303.50 0.23 284.52 303.50 238.67 -0.68 0.49 5,974,882.057 651,959.131 0.02 V. Sec (usft) 0.00 0.00 -0.02 -0.07 -0.11 -0.14 -0.20 -0.25 -0.31 -0.37 -0.42 -0.48 -0.56 -0.65 -0.74 -0.83 -0.90 -0.94 -0.92 -0.88 -0.83 7/24/2019 10:49:52AM Page 3 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 317.30 0.23 283.05 317.30 252.47 -0.67 0.43 5,974,882.069 651,959.077 0.04 -0.78 331.10 0.20 284.63 331.10 266.27 -0.66 0.38 5,974,882.081 651,959.026 0.22 -0.74 344.90 0.13 301.62 344.90 280.07 -0.64 0.35 5,974,882.094 651,958.969 0.61 -0.71 358.70 0.07 333.02 358.70 293.87 -0.63 0.33 5,974,882.110 651,958.972 0.57 -0.68 372.60 0.02 5.36 372.60 307.77 -0.62 0.33 5,974,882.120 651,958.968 0.39 -0.67 386.40 0.00 37.96 386.40 321.57 -0.61 0.33 5,974,882.122 651,958.968 0.14 -0.67 400.20 0.00 132.71 400.20 335.37 -0.61 0.33 5,974,882.122 651,958.968 0.00 -0.67 413.90 0.02 211.27 413.90 349.07 -0.62 0.32 5,974,882.120 651,958.967 0.15 -0.67 427.60 0.05 215.08 427.60 362.77 -0.62 0.32 5,974,882.113 651,958.963 0.22 -0.67 441.40 0.08 218.38 441.40 376.57 -0.64 0.31 5,974,882.100 651,958.953 0.22 -0.6811 455.30 0.08 217.55 455.30 390.47 -0.65 0.30 5,974,882.085 651,958.942 0.01 -0.66 469.10 0.10 218.50 469.10 404.27 -0.67 0.29 5,974,882.067 651,958.929 0.15 -0.68 482.90 0.13 224.15 482.90 418.07 -0.69 0.27 5,974,882.046 651,958.911 0.23 -0.68 496.90 0.15 229.99 496.90 432.07 -0.71 0.24 5,974,882.023 651,958.886 0.18 -0.68 510.80 0.17 240.27 510.80 445.97 -0.73 0.21 5,974,882.000 651,958.855 0.25 -0.68 524.80 0.17 256.34 524.80 459.97 -0.75 0.17 5,974,881.984 651,958.817 0.34 -0.66 538.80 0.17 276.70 538.80 473.97 -0.75 0.13 5,974,881.981 651,958.776 0.43 -0.64 552.80 0.13 294.40 552.80 487.97 -0.74 0.10 5,974,881.989 651,958.741 043 -0.61 566.70 0.10 305.90 566.70 501.87 -0.73 0.07 5,974,882.002 651,958.716 0.27 -0.581 580.60 0.05 315.26 580.60 515.77 -0.72 0.06 5,974,882.013 651,958.702 0.37 -0.5611 594.50 0.02 319.10 594.50 529.67 -0.71 0.05 5,974,882.019 651,958.696 0.22 -0.55 608.50 0.00 298.53 608.50 543.67 -0.71 0.05 5,974,882.021 651,958.694 0.14 -0.55 622.50 0.02 271.60 622.50 557.67 -0.71 0.05 5,974,882.021 651,958.692 0.14 -0.55 636.50 0.05 260.43 636.50 571.67 -0.71 0.04 5,974,882.020 651,958.684 0.22 -0.541 650.50 0.07 255.58 650.50 585.67 -0.71 0.02 5,974,882.017 651,958.669 0.15 -0.541 664.50 0.10 260.31 664.50 599.67 -0.72 0.00 5,974,882.012 651,958.649 0.22 -0.521 67870 0.10 273.25 678.70 613.87 -0.72 -0.02 5,974,882.010 651,958.625 0.16 -0.51 7/24/2019 10 49.52AM Page 4 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 692.80 0.12 288.62 692.80 627.97 -0.71 -0.05 5,974,882.015 651,958.598 0.25 -0.49 707.00 0.10 300.75 707.00 642.17 -0.70 -0.07 5,974,882.026 651,958.573 0.22 -0.46 721.10 0.12 309.06 721.10 656.27 -0.69 -0.09 5,974,882.041 651,958.551 0.18 -0.44 735.20 0.12 312.66 735.20 670.37 -0.67 -0.12 5,974,882.060 651,958.528 0.05 -0.41 749.20 0.12 315.17 749.20 684.37 -0.65 -0.14 5,974,882.080 651,958.507 0.04 -0.38 763.30 0.10 320.45 763.30 698.47 -0.63 -0.15 5,974,882.099 651,958.488 0.16 -0.35 777.30 0.10 320.71 777.30 712.47 -0.61 -0.17 5,974,882.118 651,958.472 0.00 -0.33 791.20 0.08 325.21 791.20 726.37 -0.59 -0.18 5,974,882.135 651,958.459 0.15 -0.30 805.10 0.07 0.28 805.10 740.27 -0.58 -0.19 5,974,882.151 651,958.453 0.33 -0.29 819.00 0.08 44.50 819.00 754.17 -0.56 -0.18 5,974,882.167 651,958.459 0.41 -0.28 833.00 0.08 61.02 833.00 768.17 -0.55 -0.17 5,974,882.179 651,958.474 0.16 -0.28 847.00 0.08 61.91 847.00 782.17 -0.54 -0.15 5,974,882.188 651,958.491 0.01 -0.29 861.00 0.10 66.75 861.00 796.17 -0.53 -0.13 5,974,882.198 651,958.511 0.15 -0.30 875.00 0.10 77.37 875.00 810.17 -0.52 -0.11 5,974,882.206 651,958.534 0.13 -0.31 889.00 0.10 86.06 889.00 824.17 -0.52 -0.08 5,974,882.210 651,958.558 0.11 -0.32 903.00 0.10 86.73 903.00 838.17 -0.52 -0.06 5,974,882.212 651,958.582 0.01 -0.34 917.00 0.12 83.83 917.00 852.17 -0.51 -0.03 5,974,882.215 651,958.609 0.15 -0.35 930.90 0.13 79.78 930.90 866.07 -0.51 0.00 5,974,882.220 651,958.639 0.10 -0.37 944.90 0.15 76.86 944.90 880.07 -0.50 0.03 5,974,882.228 651,958.672 0.15 -0.39 958.80 0.13 78.39 958.80 893.97 -0.50 0.07 5,974,882.236 651,958.705 0.15 -0.41 972.70 0.13 74.91 972.70 907.87 -0.49 0.10 5,974,882.243 651,958.736 0.06 -0.42 986.70 0.13 70.11 986.70 921.87 -0.48 0.13 5,974,882.254 651,958.766 0.08 -0.43 1,000.60 0.13 70.60 1,000.60 935.77 -0.47 0.16 5,974,882.265 651,958.795 0.01 -0.45 1,014.50 0.15 70.51 1,014.50 949.67 -0.46 0.19 5,974,882.277 651,958.827 0.14 -0.46 1,028.50 0.15 71.11 1,028.50 963.67 -0.45 0.22 5,974,882.290 651,958.862 0.01 -0.48 1,042.40 0.17 73.59 1,042.40 977.57 -0.43 0.26 5,974,882.302 651,958.898 0.15 -0.49 1,056.40 0.18 74.46 1,056.40 991.57 -0.42 0.30 5,974,882.315 651,958.939 0.07 -0.51 7/24/2019 10.'49:52AM Page 5 COMPASS 5000.1 Build 81D BP 0 by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F-48A Survey Calculation Method: Minimum Curvature Design: F-48A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (I V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 1,070.30 0.18 73.68 1,070.30 1,005.47 -0.41 0.34 5,974,882.327 651,958.981 0.02 -0.53 1,084.10 0.18 73.44 1,084.10 1,019.27 -0.40 0.38 5,974,882.341 651,959.022 0.01 -0.55 1,098.00 0.20 74.30 1,098.00 1,033.17 -0.38 0.43 5,974,882.354 651,959.066 0.15 -0.57 1,112.00 0.23 76.02 1,112.00 1,047.17 -0.37 0.48 5,974,882.369 651,959.117 0.22 -0.60 1,125.90 0.27 76.98 1,125.90 1,061.07 -0.36 0.54 5,974,882.384 651,959.175 0.29 -0.63 1,139.90 0.27 77.20 1,139.90 1,075.07 -0.34 0.60 5,974,882.400 651,959.239 0.01 -0.66 1,153.80 0.27 78.60 1,153.79 1,088.96 -0.33 0.67 5,974,882.415 651,959.303 0.05 -0.70 1,167.80 0.28 79.73 1,167.79 1,102.96 -0.32 0.73 5,974,882.429 651,959.369 008 -0.73 1,181.70 0.32 80.88 1,181.69 1,116.86 -0.30 0.80 5,974,882.443 651,959.440 0.29 -0.77 1,195.70 0.35 82.95 1,195.69 1,130.86 -0.29 0.89 5,974,882.456 651,959.521 023 -0.82 1,209.70 0.37 83.07 1,209.69 1,144.86 -0.28 0.97 5,974,882.468 651,959.608 0.14 -0.87 1,223.70 0.35 82.29 1,223.69 1,158.86 -0.27 1.06 5,974,882.481 651,959.695 0.15 -0.92 1,237.70 0.35 81.98 1,237.69 1,172.86 -0.26 1.14 5,974,882.495 651,959.780 0.01 -0.97 1,251.60 0.40 81.55 1,251.59 1,186.76 -0.25 1.23 5,974,882.509 651,959.869 0.36 -1.03 1,265.50 0.45 83.45 1,265.49 1,200.66 -0.23 1.34 5,974,882.525 651,959.971 037 -1.09 1,279.40 0.48 85.18 1,279.39 1,214.56 -0.22 1.45 5,974,882.538 651,960.083 0.24 -1.16 1,293.40 0.48 86.24 1,293.39 1,228.56 -0.21 1.57 5,974,882.549 651,960.200 0.06 -1.23 1,307.40 0.47 89.32 1,307.39 1,242.56 -0.21 168 5,974,882.556 651,960.316 0.20 -1.31 1,321.40 0.45 89.86 1,321.39 1,256.56 -0.21 1.79 5,974,882.559 651,960.428 0.15 -1.38 1,335.40 0.47 88.78 1,335.39 1,270.56 -0.21 1.91 5,974,882.563 651,960.541 0.16 -1.46 1,349.30 0.47 89.46 1,349.29 1,284.46 -0.20 2.02 5,974,882.567 651,960.654 004 -1.54 1,363.30 048 89.20 1,363.29 1,298.46 -0.20 2.14 5,974,882.571 651,960.770 007 -1.62 1,377.30 0.48 88.47 1,377.29 1,312.46 -0.20 2.25 5,974,882.575 651,960.888 0.04 -1.69 1,391.40 0.47 88.66 1,391.39 1,326.56 -0.20 2.37 5,974,882.581 651,961.004 0.07 -1.77 1,405.40 0.47 87.48 1,405.39 1,340.56 -0.19 2.49 5,974,882.587 651,961.119 0.07 -1.85 1,419.40 0.48 84.59 1,419.39 1,354.56 -0.19 2.60 5,974,882.597 651,961.235 0.19 -1.92 1,433.40 0.48 83.12 1,433.39 1,368.56 -0.17 2.72 5,974,882.612 651,961.351 0.09 -1.99 7/24/2019 10.49:52AM Page 6 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,447.50 0.50 83.12 1,447.49 1,382.66 -0.16 2.84 5,974,882.629 651,961.470 0.14 -2.06 1,461.50 0.50 83.67 1,461.49 1,396.66 -0.14 2.96 5,974,882.646 651,961.591 0.03 -2.14 1,475.60 0.50 84.21 1,475.59 1,410.76 -0.13 3.08 5,974,882.661 651,961.713 0.03 -2.21 1,489.70 0.48 85.05 1,489.68 1,424.85 -0.12 3.20 5,974,882.675 651,961.833 0.15 -2.29 1,503.80 0.40 84.85 1,503.78 1,438.95 -0.11 3.31 5,974,882.687 651,961.941 0.57 -2.35 1,517.90 0.25 75.75 1,517.88 1,453.05 -0.10 3.39 5,974,882.700 651,962.019 1.12 -2.40 1,532.10 0.25 8.31 1,532.08 1,467.25 -0.06 3.42 5,974,882.739 651,962.053 1.95 -2.40 1,546.30 0.75 300.49 1,546.28 1,481.45 0.02 3.35 5,974,882.815 651,961.976 4.90 -2.29 1,560.50 1.55 292.09 1,560.48 1,495.65 0.14 3.09 5,974,882.929 651,961.716 5.74 -2.02 1,574.70 2.30 292.37 1,574.67 1,509.84 0.32 2.65 5,974,883.101 651,961.271 5.28 -1.59 1,588.60 2.80 292.65 1,588.56 1,523.73 0.55 2.08 5,974,883.326 651,960.695 3.60 -1.02 1,602.50 3.02 293.93 1,602.44 1,537.61 0.83 1.43 5,974,883.592 651,960.041 1.65 -0.38 1,616.40 3.30 297.40 1,616.32 1,551.49 1.17 0.74 5,974,883.911 651,959.345 2.44 0.34 1,630.30 3.67 301.78 1,630.19 1,565.36 1.58 0.01 5,974,884.314 651,958.603 3.28 1.15 1,644.30 4.18 306.95 1,644.16 1,579.33 2.13 -0.78 5,974,884.841 651,957.804 4.43 2.08 1,658.30 4.88 312.48 1,658.12 1,593.29 2.84 -1.63 5,974,885.533 651,956.943 5.89 3.18 1,672.30 5.35 315.38 1,672.06 1,607.23 3.70 -2.53 5,974,886.381 651,956.028 3.83 4.43 1,686.40 5.60 316.07 1,686.10 1,621.27 4.67 -3.47 5,974,887.325 651,955.069 1.83 5.77 1,700.50 5.92 316.55 1,700.13 1,635.30 5.69 -4.44 5,974,888.328 651,954.072 2.30 7.19 1,714.60 6.13 316.73 1,714.15 1,649.32 6.77 -5.46 5,974,889.383 651,953.034 1.50 8.67 1,728.70 6.43 316.67 1,728.16 1,663.33 7.89 -6.52 5,974,890.484 651,951.954 2.13 10.21 1,742.90 6.85 316.50 1,742.27 1,677.44 9.08 -7.65 5,974,891.653 651,950.801 2.96 11.85 1,757.00 7.15 316.34 1,756.26 1,691.43 10.33 -8.83 5,974,892.874 651,949.592 2.13 13.57 1,771.10 7.70 316.10 1,770.24 1,705.41 11.64 -10.09 5,974,894.163 651,948.305 3.91 15.39 1,785.00 8.38 315.72 1,784.01 1,719.18 13.04 -11.45 5,974,895.532 651,946.924 4.91 17.34 1,799.10 8.85 315.34 1,797.95 1,733.12 14.54 -12.92 5,974,897.008 651,945.414 3.36 19.45 1,813.20 9.48 314.74 1,811.87 1,747.04 16.13 -14.51 5,974,898.565 651,943.795 4.52 21.69 7/24/2019 10:49:52AM Page 7 COMPASS 5000.1 Build 81D s 400, BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,827.20 10.08 314.14 1,825.67 1,760.84 17.80 -16.21 5,974,900.195 651,942.064 4.35 24.07 1,841.30 10.55 313.77 1,839.54 1,774.71 19.55 -18.03 5,974,901.909 651,940.211 3.37 26.59 1,855.50 11.25 313.41 1,853.48 1,788.65 21.40 -19.97 5,974,903.721 651,938.229 4.95 29.27 1,869.60 11.82 313.14 1,867.30 1,802.47 23.33 -22.03 5,974,905.611 651,936.138 4,06 3209, 1,883.60 12.33 313.10 1,880.99 1,816.16 25.34 -24.16 5,974,907.569 651,933.960 3.64 35.01 1,897.60 13.08 313.10 1,894.64 1,829.81 27.44 -26.41 5,974,909.627 651,931.670 5.36 38.08 1,911.60 13.60 313.02 1,908.27 1,843.44 29.65 -28.77 5,974,911.784 651,929.266 3.72 41.31 1,925.80 14.07 313.00 1,922.05 1,857.22 31.96 -31.25 5,974,914.049 651,926.736 3.31 44.70 1,940.00 14.58 312.97 1,935.81 1,870.98 34.36 -33.82 5,974,916.392 651,924.118 3.59 48.20 1,954.00 1488 312.92 1,949.35 1,884.52 36.78 -36.43 5,974,918.763 651,921.464 2.14 51.76 1,968.20 15.17 312.91 1,963.07 1,898.24 39.29 -39.13 5,974,921.215 651,918.718 2.04 55.43 1,982.30 15.45 312.90 1,976.67 1,911.84 41.82 -41.85 5,974,923.693 651,915.941 1.99 5914 1,996.70 15.63 312.84 1,990.54 1,925.71 44.45 -44.68 5,974,926.260 651,913.061 1.25 62.99 2,011.20 15.85 312.61 2,004.50 1,939.67 47.12 -47.57 5,974,928.869 651,910.118 1.58 6692 2,025.50 16.05 312.39 2,018.25 1,953.42 49.77 -50.47 5,974,931.465 651,907.168 1.46 70.84 2,039.80 16.35 312.29 2,031.98 1,967.15 52.46 -53.42 5,974,934.091 651,904.165 2.11 74.82 2,054.30 16.80 312.20 2,045.88 1,981.05 55.24 -56.48 5,974,936.809 651,901.047 3.11 78.94 2,068.70 17.18 312.03 2,059.65 1,994.82 58.06 -59.60 5,974,939.567 651,897.870 2.66 83.14 2,083.00 17.65 311.79 2,073.29 2,008.46 60.92 -62.79 5,974,942.360 651,894.628 3.32 87.40 2,097.30 18.18 311.54 2,086.90 2,022.07 63.84 -66.07 5,974,945.217 651,891.283 3.75 91.78 2,117.00 19.00 311.23 2,105.57 2,040.74 68.00 -70.78 5,974,949.272 651,886.488 419 98.04 2,147.00 20.28 310.93 2,133.82 2,068.99 74.62 -78.38 5,974,955.741 651,878.755 4.28 108.07 2,179.70 21.48 310.98 2,164.38 2,099.55 82.26 -87.19 5,974,963.200 651,869.801 3.67 119.67 2,214.50 22.43 311.46 2,196.65 2,131.82 90.83 -96.97 5,974,971.573 651,859.844 2.78 132.63 2,250.30 23.17 312.27 2,229.65 2,164.82 100.09 -107.30 5,974,980.621 651,849.329 2.25 146.45 2,286.10 23.82 313.17 2,262.49 2,197.66 109.78 -117.79 5,974,990.089 651,838.652 2.07 16069 2,321.90 24.35 313.93 2,295.17 2,230.34 119.84 -128.37 5,974,999.938 651,827.863 1.72 175.28 7/24/2019 10.,49:52AM Page 8 COMPASS 5000.1 Build 81D Lip BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 2,357.70 24.80 314.52 2,327.73 2,262.90 130.23 -139.04 5,975,010.104 651,816.987 1.43 190.15 2,393.00 25.45 315.20 2,359.69 2,294.86 140.80 -149.67 5,975,020.459 651,806.152 2.01 205.14 2,428.40 26.20 315.99 2,391.55 2,326.72 151.82 -160.46 5,975,031.255 651,795.143 2.33 220.55 2,463.80 26.70 316.89 2,423.25 2,358.42 163.25 -171.32 5,975,042.458 651,784.050 1.81 236.32 2,499.10 27.05 318.14 2,454.73 2,389.90 175.01 -182.10 5,975,054.004 651,773.038 1.88 252.28 2,534.40 27.40 319.64 2,486.12 2,421.29 187.18 -192.71 5,975,065.953 651,762.178 2.18 268.41 2,569.60 27.82 321.20 2,517.31 2,452.48 199.75 -203.10 5,975,078.312 651,751.534 2.38 284.69 2,605.10 28.30 322.63 2,548.64 2,483.81 212.90 -213.40 5,975,091.244 651,740.972 2.33 301.31 2,640.50 28.90 323.58 2,579.72 2,514.89 226.45 -223.58 5,975,104.586 651,730.528 2.13 318.15 2,675.90 29.82 324.07 2,610.58 2,545.75 240.46 -233.82 5,975,118.386 651,720.004 2.69 335.37 2,711.40 30.92 324.31 2,641.20 2,576.37 255.02 -244.32 5,975,132.724 651,709.211 3.12 353.16 2,746.90 31.78 324.22 2,671.52 2,606.69 270.01 -255.11 5,975,147.493 651,698.123 2.43 371.46 2,782.30 32.50 323.40 2,701.50 2,636.87 285.21 -266.23 5,975,162.461 651,686.698 2.38 390.14 2,817.80 33.37 321.67 2,731.29 2,666.46 300.52 -277.97 5,975,177.535 651,674.649 3.61 409.34 2,853.30 34.27 320.15 2,760.78 2,695.95 315.85 -290.43 5,975,192.611 651,661.881 3.48 429.04 2,888.80 35.13 319.27 2,789.97 2,725.14 331.27 -303.50 5,975,207.756 651,648.503 2.80 449.22 2,924.30 36.23 317.73 2,818.81 2,753.98 346.77 -317.22 5,975,222.977 651,634.471 4.00 469.91 2,959.60 37.45 315.78 2,847.06 2,782.23 362.18 -331.72 5,975,238.091 651,619.660 4.79 491.08 2,995.00 38.33 314.68 2,875.00 2,810.17 377.62 -347.03 5,975,253.209 651,604.040 3.13 512.81 3,030.60 38.95 314.34 2,902.80 2,837.97 393.20 -362.89 5,975,268.466 651,587.876 1.84 535.02 3,066.20 39.62 314.18 2,930.36 2,865.53 408.93 -379.03 5,975,283.866 651,571.418 1.90 557.55 3,101.80 40.50 313.70 2,957.60 2,892.77 424.83 -395.53 5,975,299.425 651,554.602 2.62 580.43 3,137.30 41.50 312.89 2,984.40 2,919.57 440.80 -412.48 5,975,315.047 651,537.331 3.19 603.68 3,172.50 42.40 312.34 3,010.57 2,945.74 456.73 -429.80 5,975,330.622 651,519.696 2.76 627.16 3,207.50 43.07 312.16 3,036.28 2,971.45 472.70 -447.38 5,975,346.231 651,501.797 1.95 650.84 3,242.60 43.88 312.15 3,061.75 2,996.92 488.91 -465.28 5,975,362.072 651,483.570 2.31 674.92 3,277.80 45.22 312.14 3,086.84 3,022.01 505.48 -483.59 5,975,378.265 651,464.930 3.81 699.54 7/24/2019 10:49 52AM Page 9 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,312.90 46.82 311.87 3,111.21 3,046.38 522.38 -502.36 5,975,394.781 651,445.825 4.59 724.71 3,347.80 48.02 311.60 3,134.82 3,069.99 539.48 -521.54 5,975,411.494 651,426.307 3.49 750.32 3,382.80 48.72 311.54 3,158.07 3,093.24 556.84 -541.11 5,975,428.451 651,406.389 2.00 776.38 3,417.80 49.27 311.50 3,181.04 3,116.21 574.35 -560.88 5,975,445.554 651,386.264 1.57 802.68 3,452.90 49.77 311.44 3,203.83 3,139.00 592.03 -580.89 5,975,462.824 651,365.906 1.43 829.28 3,488.00 5028 311.28 3,226.38 3,161.55 609.80 -601.08 5,975,480.183 651,345.362 1.49 856.06 3,523.10 50.63 31099 3,248.68 3,183.85 627.63 -621.49 5,975,497.595 651,324.592 1.69 883.04 3,558.30 51.40 310.75 3,270.77 3,205.94 645.56 -642.21 5,975,515.099 651,303.515 1.70 910.31 3,593.40 52.00 310.66 3,292.53 3,227.70 663.53 -663.09 5,975,532.635 651,282.275 1.72 937.71 3,628.60 52.47 310.64 3,314.08 3,249.25 681.65 -684.21 5,975,550.329 651,260.801 1.34 965.38 3,663.80 52.78 31064 3,335.45 3,270.62 699.87 -705.43 5,975,568.113 651,239.212 0.88 993.20 3,699.00 53.05 31065 3,356.68 3,291.85 718.16 -726.74 5,975,585.967 651,217.541 0.77 1,021 13 3,734.10 53.08 310.68 3,377.77 3,312.94 736.45 -748.02 5,975,603.813 651,195.895 0.11 1,049.04 3,769.20 53,05 310.73 3,398.86 3,334.03 754.74 -769.29 5,975,621.674 651,174.261 0.14 1,076.95 3,804.20 5307 310.78 3,419.89 3,355.06 773.01 -790.48 5,975,639.502 651,152.706 0.13 1,104.77 3,839.40 53.08 310.82 3,441.04 3,376.21 791.39 -811.78 5,975,657.452 651,131.038 010 1,132.77 3,874.60 53 33 310.84 3,462.13 3,397.30 809.82 -833.11 5,975,675.444 651,109.342 0.71 1,160.81 3,909.70 5358 310.82 3,483.03 3,418.20 828.26 -854.45 5,975,693.444 651,087.638 0.71 1,188.87 3,944.40 53.58 310.83 3,503.63 3,438.80 846.51 -875.58 5,975,711.265 651,066.145 0.02 1,216.65 3,979.20 53.58 310.89 3,524.29 3,459.46 864.83 -896.75 5,975,729.150 651,044.600 0.14 1,244.51 4,013.90 5360 310.90 3,544.88 3,480.05 883.12 -917.86 5,975,747.000 651,023.126 0.06 1,272.30 4,048.60 53.53 31088 3,565.49 3,500.66 901.39 -938.97 5,975,764.842 651,001.657 0.21 1,300.08 1 4,083.40 53.55 310.88 3,586.17 3,521.34 919.71 -960.13 5,975,782.726 650,980.130 0.06 1,327.93 4,118.10 53.57 310.89 3,606.78 3,541.95 937.98 -981.24 5,975,800.565 650,958.661 0.06 1,355.71 l 4,152.90 53.55 310.86 3,627.45 3,562.62 956.30 -1,002.40 5,975,818.452 650,937.127 0.09 1,383.56 4,187.40 53.67 310.81 3,647.92 3,583.09 974.46 -1,023.42 5,975,836.181 650,915.752 0.37 1,411.19 4,221.80 53.68 310.74 3,668.30 3,603.47 992.56 -1,044.40 5,975,853.851 650,894.403 0.17 1,438.77 7/2412019 10:49:52AM Page 10 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,256.50 53.70 310.73 3,688.85 3,624.02 1,010.81 -1,065.59 5,975,871.664 650,872.851 0.06 1,466.58 4,291.10 53.87 310.73 3,709.29 3,644.46 1,029.02 -1,086.75 5,975,889.445 650,851.334 0.49 1,494.35 4,325.70 53.90 310.70 3,729.68 3,664.85 1,047.26 -1,107.93 5,975,907.243 650,829.784 0.11 1,522.15 4,360.30 53.95 310.67 3,750.06 3,685.23 1,065.49 -1,129.14 5,975,925.038 650,808.215 0.16 1,549.97 4,394.90 54.20 310.66 3,770.36 3,705.53 1,083.74 -1,150.39 5,975,942.861 650,786.598 0.72 1,577.84 4,429.50 54.55 310.66 3,790.51 3,725.68 1,102.07 -1,171.73 5,975,960.748 650,764.897 1.01 1,605.81 4,464.10 54.90 310.66 3,810.49 3,745.66 1,120.47 -1,193.15 5,975,978.714 650,743.102 1.01 1,633.91 4,498.70 55.23 310.66 3,830.31 3,765.48 1,138.96 -1,214.67 5,975,996.754 650,721.217 0.95 1,662.12 4,526.50 55.60 310.63 3,846.09 3,781.26 1,153.86 -1,232.04 5,976,011.306 650,703.553 1.33 1,684.88 4,551.90 55.95 310.62 3,860.37 3,795.54 1,167.54 -1,247.98 5,976,024.654 650,687.341 1.38 1,705.77 4,577.30 56.32 310.62 3,874.53 3,809.70 1,181.27 -1,263.99 5,976,038.056 650,671.058 1.46 1,726.75 4,602.70 56.58 310.61 3,888.56 3,823.73 1,195 05 -1,280.06 5,976,051.507 650,654.714 1.02 1,747.80 4,628.20 56.67 310.61 3,902.59 3,837.76 1,208.91 - -1,296.22 5,976,065.037 650,638.272 0.35 1,768.98 4,653.80 56.57 310.61 3,916.68 3,851.85 1,222.83 -1,312.45 5,976,078.618 650,621.766 0.39 1,790.24 4,678.90 56.22 310.68 - 3,930.57 3,865.74 1,236.44 -1,328.31 5,976,091.910 650,605.632 1.41 1,811.03 4,704.10 55.90 310.71 3,944.64 3,879.81 1,250.07 -1,344.16 5,976,105.217 650,589.509 1.27 1,831.83 4,729.30 55.68 310.64 3,958.81 3,893.98 1,263.66 -1,359.97 5,976,118.475 650,573.433 0.90 1,852.56 4,754.80 55.55 310.53 3,973.21 3,908.38 1,277.35 -1,375.95 5,976,131.838 650,557.178 0.62 1,873.48 4,782.70 55.62 310.45 3,988.98 3,924.15 1,292.29 -1,393.46 5,976,146.425 650,539.376 0.34 1,896.37 4,811.00 55.80 310.47 4,004.92 3,940.09 1,307.47 -1,411.25 5,976,161.232 650,521.284 0.64 1,919.62 4,839.60 55.93 310.46 4,020.97 3,956.14 1,322.83 -1,429.26 5,976,176.226 650,502.967 0.46 1,943.15 4,870.30 56.02 310.46 4,038.15 3,973.32 1,339.34 -1,448.62 5,976,192.340 650,483.279 0.29 1,968.45 4,900.60 56.10 310.48 4,055.07 3,990.24 1,355.65 -1,467.74 5,976,208.264 650,463.830 0.27 1,993.45 4,930.30 56 00 310.50 4,071.65 4,006.82 1,371.65 -1,486.48 5,976,223.877 650,444.774 0.34 2,017.94 4,959.60 5587 310.61 4,088.06 4,023.23 1,387.43 -1,504.92 5,976,239.280 650,426.018 0.54 2,042.08 4,987.00 55.85 310.74 4,103.44 4,038.61 1,402.21 -1,522.12 5,976,253.708 650,408.524 0.40 2,064.64 5,014.40 55.73 310.86 4,118.85 4,054.02 1,417.02 -1,539.27 5,976,268.163 650,391.075 0.57 2,087.18 7/24/2019 10: 49 52A Page 11 COMPASS 5000 1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,041.90 55.58 310.99 4,134.36 4,069.53 1,431.89 -1,556.42 5,976,282.684 650,373.623 0.67 2,109.77 5,069.40 55.63 311.09 4,149.90 4,085.07 1,446.79 -1,573.54 5,976,297.233 650,356.211 0.35 2,132.36 5,097.00 55.65 311.10 4,165.47 4,100.64 1,461.77 -1,590.71 5,976,311.857 650,338.742 0.08 2,155.04 5,124.60 55.63 311.05 4,181.05 4,116.22 1,476.74 -1,607.89 5,976,326.475 650,321.267 0.17 2,177.72 5,152.20 55.57 311.02 4,196.64 4,131.81 1,491.69 -1,625.06 5,976,341.073 650,303.791 0.24 2,200.38 5,179.90 55.55 311.02 4,212.31 4,147.48 1,506.68 -1,642.30 5,976,355.713 650,286.256 0.07 2,223.12 5,207.50 55.72 310.99 4,227.89 4,163.06 1,521.63 -1,659.49 5,976,370.309 650,268.765 0.62 2,245.79 5,234.90 55.57 310.89 4,243.35 4,178.52 1,536.45 -1,676.58 5,976,384.781 650,251.382 0.62 2,268.30 5,262.50 55.42 310.72 4,258.98 4,194.15 1,551.32 -1,693.80 5,976,399.291 650,233.870 0.74 2,290.93 5,290.10 55.47 310.59 4,274.64 4,209.81 1,566.13 -1,711.04 5,976,413.747 650,216.330 0.43 2,313.54 5,317.80 55.28 310.54 4,290.38 4,225.55 1,580.95 -1,728.36 5,976,428.215 650,198.718 0.70 2,336.21 5,345.50 54.97 310.55 4,306.22 4,241.39 1,595.72 -1,745.63 5,976,442.633 650,181.155 1.12 2,358.81 5,373.20 54.95 310.58 4,322.12 4,257.29 1,610.47 -1,762.85 5,976,457.029 650,163.632 0.11 2,381.36 5,400.80 55.17 310.57 4,337.93 4,273.10 1,625.19 -1,780.04 5,976,471.393 650,146.154 0.80 2,403.86 5,428.00 54.98 310.56 4,353.50 4,288.67 1,639.69 -1,796.98 5,976,485.548 650,128.923 0.70 2,426.04 5,455.10 54.65 310.60 4,369.12 4,304.29 1,654.10 -1,813.80 5,976,499.611 650,111.814 1.22 2,448.06 5,482.20 54.27 310.62 4,384.87 4,320.04 1,668.45 -1,830.54 5,976,513.621 650,094.787 1.40 2,469.99 5,509.40 53.73 310.60 4,400.86 4,336.03 1,682.77 -1,847.25 5,976,527.602 650,077.796 1.99 2,491.88 5,536.40 53.43 310.58 4,416.89 4,352.06 1,696.91 -1,863.75 5,976,541.400 650,061.015 1.11 2,513.49 5,563.40 53.33 310.51 4,432.99 4,368.16 1,711.00 -1,880.22 5,976,555.149 650,044.267 0.42 2,535.04 5,590.60 53.10 310.40 4,449.28 4,384.45 1,725.13 -1,896.79 5,976,568.944 650,027.410 0.91 2,556.69 5,617.80 53.03 310.31 4,465.62 4,400.79 1,739.21 -1,913.36 5,976,582.682 650,010.561 0.37 2,578.31 5,644.90 53.10 310.28 4,481.91 4,417.08 1,753.22 -1,929.88 5,976,596.353 649,993.760 0.27 2,599.84 5,672.30 52.98 310.39 4,498.38 4,433.55 1,767.39 -1,946.57 5,976,610.182 649,976.788 0.54 2,621.60 5,700.10 52.85 310.58 4,515.15 4,450.32 1,781.79 -1,963.44 5,976,624.234 649,959.634 0.72 2,643.65 5,728.00 52.95 310.74 4,531.98 4,467.15 1,796.29 -1,980.32 5,976,638.387 649,942.464 0.58 2,665.78 5,755.90 53.08 310.84 4,548.76 4,483.93 1,810.85 -1,997.19 5,976,652.601 649,925.300 0.55 2,687.96 7/24/2019 10:49:52AM Page 12 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft (usft) 5,783.80 53.23 310.92 4,565.49 4,500.66 1,825.46 -2,014.07 5,976,666.867 649,908.128 0.58 2,710.17 5,811.70 53.30 311.12 4,582.18 4,517.35 1,840.14 -2,030.94 5,976,681.196 649,890.965 0.63 2,732.43 5,839.60 53.17 311.51 4,598.88 4,534.05 1,854.89 -2,047.73 5,976,695.608 649,873.884 1.21 2,754.68 5,867.30 52.92 311.94 4,615.53 4,550.70 1,869.62 -2,064.25 5,976,710.001 649,857.069 1.53 2,776.74 5,895.00 52.60 312.29 4,632.29 4,567.46 1,884.41 -2,080.61 5,976,724.454 649,840.416 1.53 2,798.72 5,922.80 52.50 312.54 4,649.20 4,584.37 1,899.30 -2,096.90 5,976,739.005 649,823.825 0.80 2,820.73 5,950.70 52.50 312.66 4,666.18 4,601.35 1,914.28 -2,113.20 5,976,753.653 649,807.233 0.34 2,842.81 5,978.50 52.33 312.75 4,683.14 4,618.31 1,929.22 -2,129.38 5,976,768.263 649,790.745 0.66 2,864.79 6,006.40 52.18 312.86 4,700.22 4,635.39 1,944.21 -2,145.57 5,976,782.921 649,774.260 0.62 2,886.81 6,034.30 52.03 313.10 4,717.35 4,652.52 1,959.22 -2,161.68 5,976,797.601 649,757.853 0.87 2,908.78 6,062.20 51.83 313.39 4,734.56 4,669.73 1,974.27 -2,177.68 5,976,812.320 649,741.553 1.09 2,930.70 6,090.10 51.88 313.51 4,751.79 4,686.96 1,989.36 -2,193.61 5,976,827.083 649,725.322 0.38 2,952.61 6,118.00 52.08 313.60 4,768.97 4,704.14 2,004.51 -2,209.54 5,976,841.901 649,709.091 0.76 2,974.56 6,145.50 52.07 313.86 4,785.88 4,721.05 2,019.50 -2,225.21 5,976,856.575 649,693.116 0.75 2,996.23 6,173.00 51.75 314.11 4,802.84 4,738.01 2,034.53 -2,240.78 5,976,871.286 649,677.243 1.37 3,017.85 6,200.20 51.08 314.28 4,819.81 4,754.98 2,049.35 -2,256.03 5,976,885.794 649,661.703 2.51 3,039.09 6,227.50 50.43 314.45 4,837.08 4,772.25 2,064.14 -2,271.14 5,976,900.267 649,646.293 2.43 3,060.22 6,254.90 49.73 314.51 4,854.66 4,789.83 2,078.86 -2,286.14 5,976,914.683 649,631.005 2.56 3,081.22 6,282.30 49.18 314.49 4,872.47 4,807.64 2,093.45 -2,300.99 5,976,928.971 649,615.863 2.01 3,102.02 6,309.70 49.23 314.48 4,890.37 4,825.54 2,107.99 -2,315.79 5,976,943.203 649,600.774 0.18 3,122.75 6,337.10 49.50 314.51 4,908.22 4,843.39 2,122.56 -2,330.62 5,976,957.471 649,585.650 0.99 3,143.53 6,364.50 49.83 314.52 4,925.95 4,861.12 2,137.20 -2,345.51 5,976,971.808 649,570.465 1.20 3,164.40 6,391.90 50.12 314.54 4,943.57 4,878.74 2,151.92 -2,360.47 5,976,986.215 649,555.213 1.06 3,185.37 6,419.40 50.43 314.60 4,961.15 4,896.32 2,166.76 -2,375.54 5,977,000.749 649,539.849 1.14 3,206.51 6,446.80 50.77 314.64 4,978.54 4,913.71 2,181.63 -2,390.61 5,977,015.311 649,524.481 1.25 3,227.67 6,474.20 51.02 314.66 4,995.82 4,930.99 2,196.58 -2,405.73 5,977,029.943 649,509.056 0.91 3,248.92 6,501.60 51.22 314.75 5,013.02 4,948.19 2,211.58 -2,420.89 5,977,044.636 649,493.597 0.77 3,270.24 7/24/2019 10:49:52AM Page 13 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EJW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,528.80 51.37 314.92 5,030.03 4,965.20 2,226.55 -2,435.95 5,977,059.293 649,478.245 0.74 3,291.45 6,556.00 51.55 315.06 5,046.98 4,982.15 2,241.59 -2,450.99 5,977,074.025 649,462.898 0.77 3,312.72 6,583.20 51.75 315.16 5,063.85 4,999.02 2,256.70 -2,466.05 5,977,088.828 649,447.542 0.79 3,334.05 6,610.60 51.95 315.29 5,080.78 5,015.95 2,272.00 -2,481.22 5,977,103.812 649,432.060 0.82 3,355.59 6,638.00 52.13 315.44 5,097.63 5,032.80 2,287.37 -2,496.40 5,977,118.873 649,416.574 0.79 3,377.18 6,665.40 52.32 315.55 5,114.42 5,049.59 2,302.82 -2,511.58 5,977,134.007 649,401.084 0.76 3,398.84 6,692.80 52.58 315.61 5,131.12 5,066.29 2,318.33 -2,526.79 5,977,149.210 649,385.570 0.96 3,420.56 6,720.30 52.87 315.67 5,147.77 5,082.94 2,333.98 -2,542.09 5,977,164.541 649,369.957 1.07 3,442.44 6,747.80 53.18 315.70 5,164.31 5,099.48 2,349.70 -2,557.43 5,977,179.945 649,354.295 1.13 3,464.40 6,775.20 53.48 315.72 5,180.67 5,115.84 2,365.43 -2,572.78 5,977,195.361 649,338.634 1.10 3,486.38 6,802.70 53.77 315.73 5,196.98 5,132.15 2,381.28 -2,588.24 5,977,210.897 649,322.860 1.05 3,508.52 6,830.20 54.12 315.72 5,213.17 5,148.34 2,397.20 -2,603.76 5,977,226.497 649,307.021 1.27 3,530.75 6,857.30 54.47 315.71 5,228.99 5,164.16 2,412.95 -2,619.12 5,977,241.934 649,291.341 1.29 3,552.75 6,884.20 54.78 315.73 5,244.56 5,179.73 2,428.66 -2,634.44 5,977,257.323 649,275.714 1.15 3,574.68 6,911.00 55.10 315.75 5,259.95 5,195.12 2,444.37 -2,649.75 5,977,272.719 649,260.089 1.20 3,596.62 6,937.90 55.30 315.75 5,275.31 5,210.48 2,460.19 -2,665.16 5,977,288.225 649,244.360 0.74 3,618.70 6,964.70 55.33 315.80 5,290.56 5,225.73 2,475.98 -2,680.53 5,977,303.701 649,228.673 0.19 3,640.74 6,991.50 55.28 315.86 5,305.81 5,240.98 2,491.79 -2,695.88 5,977,319.191 649,213.004 0.26 3,662.77 7,018.40 55.37 315.88 5,321.12 5,256.29 2,507.66 -2,711.29 5,977,334.753 649,197.283 0.34 3,684.89 7,045.20 55.67 315.91 5,336.29 5,271.46 2,523.53 -2,726.66 5,977,350.300 649,181.590 1.12 3,706.98 7,072.40 55.78 315.95 5,351.61 5,286.78 2,539.68 -2,742.30 5,977,366.128 649,165.634 0.42 3,729.46 7,099.30 55.75 315.96 5,366.74 5,301.91 2,555.66 -2,757.76 5,977,381.795 649,149.853 0.12 3,751.70 7,126.10 55.82 315.99 5,381.81 5,316.98 2,571.60 -2,773.16 5,977,397.414 649,134.133 0.28 3,773.86 7,153.00 55.88 316.05 5,396.91 5,332.08 2,587.62 -2,788.62 5,977,413.115 649,118.354 0.29 3,796.12 7,179.70 55.90 316.10 5,411.88 5,347.05 2,603.54 -2,803.95 5,977,428.722 649,102.700 0.17 3,818.22 7,206.30 55.75 316.11 5,426.82 5,361.99 2,619.40 -2,819.21 5,977,444.267 649,087.124 0.56 3,840.23 7,233.20 55.65 316.07 5,441.98 5,377.15 2,635.41 -2,834.62 5,977,459.960 649,071.393 0.39 3,862.45 7/24/2019 10:49:52AM Page 14 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,259.90 55.65 316.06 5,457.05 5,392.22 2,651.28 -2,849.92 5,977,475.520 649,055.780 0.03 3,884.49 7,286.60 55.58 316.03 5,472.13 5,407.30 2,667.14 -2,865.21 5,977,491.068 649,040.169 0.28 3,906.53 7,313.40 55.58 316.02 5,487.28 5,422.45 2,683.05 -2,880.56 5,977,506.662 649,024.501 0.03 3,928.63 7,340.10 55.48 315.99 5,502.39 5,437.56 2,698.89 -2,895.85 5,977,522.183 649,008.895 0.39 3,950.64 7,366.90 55.38 316.00 5,517.59 5,452.76 2,714.76 -2,911.18 5,977,537.741 648,993.246 0.37 3,972.71 7,393.80 55.48 316.01 5,532.86 5,468.03 2,730.70 -2,926.57 5,977,553.360 648,977.542 0.37 3,994.86 7,420.60 55.50 316.00 5,548.04 5,483.21 2,746.58 -2,941.91 5,977,568.932 648,961.885 0.08 4,016.94 7,447.50 55.42 316.03 5,563.29 5,498.46 2,762.53 -2,957.30 5,977,584.559 648,946.178 0.31 4,039.10 7,474.30 55.35 316.05 5,578.52 5,513.69 2,778.40 -2,972.61 5,977,600.121 648,930.550 0.27 4,061.15 7,501.00 55.40 316.05 5,593.69 5,528.86 2,794.22 -2,987.86 5,977,615.625 648,914.985 0.19 4,083.12 7,527.80 55.58 316.04 5,608.87 5,544.04 2,810.12 -3,003.18 5,977,631.208 648,899.339 0.67 4,105.21 7,554.50 55.67 316.07 5,623.95 5,559.12 2,825.99 -3,018.48 5,977,646.761 648,883.729 0.35 4,127.24 7,580.80 55.42 316.10 5,638.83 5,574.00 2,841.61 -3,033.52 5,977,662.074 648,868.375 0.96 4,148.93 7,607.10 55.23 316.14 5,653.79 5,588.96 2,857.20 -3,048.51 5,977,677.355 648,853.071 0.73 4,170.56 7,633.30 55.37 316.14 5,668.70 5,603.87 2,872.73 -3,063.44 5,977,692.580 648,837.835 0.53 4,192.10 7,659.60 55.33 316.12 5,683.66 5,618.83 2,888.33 -3,078.43 5,977,707.869 648,822.530 0.16 4,213.73 7,685.90 55.08 316.05 5,698.66 5,633.83 2,903.89 -3,093.41 5,977,723.119 648,807.239 0.98 4,235.33 7,712.20 54.88 315.97 5,713.76 5,648.93 2,919.38 -3,108.37 5,977,738.308 648,791.970 0.80 4,256.86 7,738.60 54.80 315.93 5,728.96 5,664.13 2,934.89 -3,123.38 5,977,753.512 648,776.653 0.33 4,278.45 7,765.10 54.88 315.93 5,744.22 5,679.39 2,950.46 -3,138.44 5,977,768.768 648,761.273 0.30 4,300.11 7,791.50 55.03 315.94 5,759.38 5,694.55 2,965.99 -3,153.48 5,977,783.990 648,745.931 0.57 4,321.72 7,817.90 54.98 315.94 5,774.52 5,709.69 2,981.53 -3,168.52 5,977,799.222 648,730.580 0.19 4,343.35 7,844.10 54.78 316.00 5,789.59 5,724.76 2,996.94 -3,183.41 5,977,814.324 648,715.378 0.79 4,364.78 7,870.50 54.42 316.04 5,804.89 5,740.06 3,012.42 -3,198.35 5,977,829.502 648,700.125 1.37 4,386.29 7,897.40 53.92 316.06 5,820.63 5,755.80 3,028.13 -3,213.49 5,977,844.892 648,684.674 1.86 4,408.10 7,924.40 53.65 316.14 5,836.58 5,771.75 3,043.82 -3,228.59 5,977,860.278 648,669.256 1.03 4,429.89 7,951.20 53.57 316.19 5,852.48 5,787.65 3,059.38 -3,243.54 5,977,875.533 648,654.003 0.33 4,451.46 7/24/2019 10.49:52AM Page 15 COMPASS 5000.1 Build 81D BP Final Survey Repoli Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,978.40 53.47 316.14 5,868.66 5,803.83 3,075.16 -3,258.68 5,977,890.998 648,638.540 0.40 4,473.33 8,005.50 53.30 315.96 5,884.82 5,819.99 3,090.82 -3,273.78 5,977,906.348 648,623.130 0.82 4,495.08 8,032.50 53.27 315.79 5,900.96 5,836.13 3,106.36 -3,288.85 5,977,921.574 648,607.751 0.52 4,516.72 8,059.50 53.30 315.61 5,917.10 5,852.27 3,121.85 -3,303.97 5,977,936.754 648,592.325 0.55 4,538.36 8,086.90 53.23 315.46 5,933.49 5,868.66 3,137.52 -3,319.35 5,977,952.109 648,576.630 0.51 4,560.32 8,114.10 53.13 315.42 5,949.79 5,884.96 3,153.03 -3,334.62 5,977,967.310 648,561.042 0.39 4,582.09 8,141.40 53.12 315.42 5,966.17 5,901.34 3,168.59 -3,349.95 5,977,982.550 648,545.403 0.04 4,603.92 8,168.60 53.03 315.49 5,982.51 5,917.68 3,184.09 -3,365.21 5,977,997.734 648,529.840 0.39 4,625.66 8,195.80 52.95 315.57 5,998.89 5,934.06 3,199.59 -3,380.42 5,978,012.921 648,514.314 0.38 4,647.38 8,223.20 52.90 315.56 6,015.41 5,950.58 3,215.20 -3,395.73 5,978,028.216 648,498.697 0.18 4,669.24 8,250.30 52.82 315.49 6,031.77 5,966.94 3,230.61 -3,410.86 5,978,043.320 648,483.254 0.36 4,690.83 8,277.20 52.73 315.42 6,048.04 5,983.21 3,245.88 -3,425.89 5,978,058.277 648,467.924 0.39 4,712.25 8,303.90 52.58 315.36 6,064.24 5,999.41 3,260.99 -3,440.79 5,978,073.082 648,452.715 0.59 4,733.47 8,330.80 52.43 315.32 6,080.61 6,015.78 3,276.17 -3,455.80 5,978,087.954 648,437.410 0.57 4,754.81 8,357.60 52.35 315.35 6,096.97 6,032.14 3,291.27 -3,470.72 5,978,102.748 648,422.184 0.31 4,776.03 8,384.50 52.08 315.41 6,113.45 6,048.62 3,306.40 -3,485.65 5,978,117.573 648,406.949 1.02 4,797.29 8,411.40 51.75 315.53 6,130.04 6,065.21 3,321.49 -3,500.50 5,978,132.361 648,391.799 1.28 4,818.46 8,438.30 51.50 315.69 6,146.74 6,081.91 3,336.56 -3,515.25 5,978,147.128 648,376.745 1.04 4,839.54 8,465.10 51.23 315.79 6,163.47 6,098.64 3,351.56 -3,529.86 5,978,161.821 648,361.835 1.05 4,860.47 8,491.90 50.90 315.89 6,180.32 6,115.49 3,366.51 -3,544.39 5,978,176.477 648,347.013 1.27 4,881.32 8,518.70 50.55 315.94 6,197.28 6,132.45 3,381.41 -3,558.82 5,978,191.083 648,332.281 1.31 4,902.06 8,545.50 50.47 315.90 6,214.32 6,149.49 3,396.27 -3,573.21 5,978,205.645 648,317.596 0.32 4,922.75 8,572.40 50.52 315.81 6,231.44 6,166.61 3,411.16 -3,587.66 5,978,220.241 648,302.843 0.32 4,943.50 8,599.20 50.52 315.70 6,248.48 6,183.65 3,425.98 -3,602.10 5,978,234.763 648,288.114 0.32 4,964.18 8,626.10 50.52 315.60 6,265.58 6,200.75 3,440.83 -3,616.61 5,978,249.312 648,273.303 0.29 4,984.94 8,652.90 50.47 315.49 6,282.63 6,217.80 3,455.59 -3,631.09 5,978,263.774 648,258.526 0.37 5,005.62 8,679.80 50.37 315.42 6,299.77 6,234.94 3,470.37 -3,645.64 5,978,278.252 648,243.687 0.42 5,026.35 7/24/2019 10.49:52AM Page 16 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 8,706.70 50.38 315.36 6,316.92 6,252.09 3,485.12 -3,660.19 5,978,292.703 648,228.842 0.18 5,047.06 8,733.60 50.48 315.30 6,334.06 6,269.23 3,499.86 -3,674.76 5,978,307.150 648,213.969 0.41 5,067.79 8,760.50 50.52 315.25 6,351.17 6,286.34 3,514.61 -3,689.37 5,978,321.597 648,199.068 0.21 5,088.54 8,787.29 50.47 315.18 6,368.21 6,303.38 3,529.28 -3,703.93 5,978,335.969 648,184.213 0.27 5,109.21 8,814.10 50.40 315.08 6,385.29 6,320.46 3,543.93 -3,718.51 5,978,350.317 648,169.339 0.39 5,129.87 8,840.80 50.35 315.01 6,402.32 6,337.49 3,558.48 -3,733.04 5,978,364.572 648,154.518 0.28 5,150.42 8,867.60 50.33 314.95 6,419.42 6,354.59 3,573.07 -3,747.64 5,978,378.856 648,139.633 0.19 5,171.05 8,894.50 50.33 314.90 6,436.59 6,371.76 3,587.69 -3,762.30 5,978,393.177 648,124.680 0.14 5,191.75 8,921.40 50.32 314.85 6,453.77 6,388.94 3,602.30 -3,776.97 5,978,407.484 648,109.716 0.15 5,212.44 8,947.90 50.33 314.77 6,470.69 6,405.86 3,616.67 -3,791.44 5,978,421.561 648,094.959 0.24 5,232.83 8,974.39 50.42 314.68 6,487.58 6,422.75 3,631.03 -3,805.94 5,978,435.621 648,080.175 0.43 5,253.22 9,000.79 50.47 314.63 6,504.39 6,439.56 3,645.34 -3,820.42 5,978,449.630 648,065.410 0.24 5,273.56 9,027.20 50.42 314.58 6,521.21 6,456.38 3,659.63 -3,834.91 5,978,463.631 648,050.627 0.24 5,293.91 9,053.89 50.47 314.51 6,538.21 6,473.38 3,674.07 -3,849.58 5,978,477.765 648,035.672 0.28 5,314.48 9,080.29 50.40 314.42 6,555.02 6,490.19 3,688.32 -3,864.10 5,978,491.722 648,020.863 0.37 5,334.82 9,106.70 50.32 314.34 6,571.87 6,507.04 3,702.55 -3,878.64 5,978,505.648 648,006.043 0.38 5,355.14 9,132.89 50.40 314.30 6,588.58 6,523.75 3,716.64 -3,893.07 5,978,519.442 647,991.332 0.33 5,375.29 9,159.20 50.35 314.23 6,605.36 6,540.53 3,730.78 -3,907.58 5,978,533.289 647,976.538 0.28 5,395.54 9,185.60 50.23 314.16 6,622.23 6,557.40 3,744.94 -3,922.14 5,978,547.147 647,961.694 0.50 5,415.83 9,211.90 50.25 314.09 6,639.05 6,574.22 3,759.02 -3,936.66 5,978,560.926 647,946.900 0.22 5,436.03 9,238.29 50.38 314.05 6,655.90 6,591.07 3,773.14 -3,951.25 5,978,574.751 647,932.026 0.51 5,456.32 9,264.79 50.32 313.99 6,672.81 6,607.98 3,787.32 -3,965.92 5,978,588.629 647,917.070 0.29 5,476.70 9,291.20 50.30 313.92 6,689.68 6,624.85 3,801.43 -3,980.55 5,978,602.434 647,902.158 0.22 5,497.00 9,317.70 50.30 313.87 6,706.60 6,641.77 3,815.56 -3,995.24 5,978,616.269 647,887.183 0.15 5,517.37 9,344.10 50.22 313.85 6,723.48 6,658.65 3,829.63 -4,009.88 5,978,630.035 647,872.265 0.31 5,537.64 9,370.60 50.18 313.82 6,740.44 6,675.61 3,843.73 -4,024.57 5,978,643.834 647,857.298 0.17 5,557.98 9,397.10 50.13 313.76 6,757.42 6,692.59 3,857.81 -4,039.25 5,978,657.612 647,842.329 0.26 5,578.30 724/2019 10: 49 52A Page 17 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 9,423.60 50.07 313.74 6,774.42 6,709.59 3,871.87 -4,053.94 5,978,671.369 647,827.362 0.23 5,598.61 9,449.89 50.05 313.70 6,791.30 6,726.47 3,885.80 -4,068.51 5,978,685.001 647,812.516 0.14 5,618.74 9,476.20 50.03 313.66 6,808.20 6,743.37 3,899.73 -4,083.09 5,978,698.629 647,797.654 0.14 5,638.88 9,502.70 49.85 313.61 6,825.25 6,760.42 3,913.72 -4,097.77 5,978,712.324 647,782.695 0.69 5,659.13 9,529.20 49.72 313.56 6,842.36 6,777.53 3,927.68 -4,112.43 5,978,725.975 647,767.758 0.51 5,679.34 9,555.70 49.70 313.49 6,859.50 6,794.67 3,941.60 -4,127.08 5,978,739.594 647,752.824 0.22 5,699.53 9,582.29 49.58 313.42 6,876.72 6,811.89 3,955.53 -4,141.79 5,978,753.228 647,737.837 0.49 5,719.76 9,608.49 49.52 313.34 6,893.71 6,828.88 3,969.23 -4,156.28 5,978,766.624 647,723.073 0.33 5,739.66 9,634.60 49.50 313.28 6,910.67 6,845.84 3,982.85 -4,170.73 5,978,779.948 647,708.352 0.19 5,759.49 9,660.70 49.25 313.29 6,927.66 6,862.83 3,996.43 -4,185.15 5,978,793.234 647,693.660 0.96 5,779.26 9,686.70 49.05 313.34 6,944.67 6,879.84 4,009.92 -4,199.46 5,978,806.432 647,679.081 0.78 5,798.90 9,712.70 48.88 313.35 6,961.74 6,896.91 4,023.38 -4,213.73 5,978,819.601 647,664.550 0.65 5,818.48 9,738.79 48.63 313.31 6,978.94 6,914.11 4,036.84 -4,228.00 5,978,832.769 647,650.011 0.97 5,838.06 9,764.60 48.52 313.33 6,996.02 6,931.19 4,050.12 -4,242.07 5,978,845.758 647,635.666 0.43 5,857.38 9,790.39 48.33 313.29 7,013.13 6,948.30 4,063.35 -4,256.11 5,978,858.704 647,621.363 0.75 5,876.65 9,816.39 48.02 313.24 7,030.47 6,965.64 4,076.63 -4,270.22 5,978,871.693 647,606.990 1.20 5,895.99 9,842.39 47.73 313.29 7,047.91 6,983.08 4,089.85 -4,284.26 5,978,884.621 647,592.684 1.12 5,915.24 9,868.39 47.48 313.33 7,065.44 7,000.61 4,103.02 -4,298.24 5,978,897.506 647,578.449 0.97 5,934.41 9,894.39 47.23 313.39 7,083.05 7,018.22 4,116.15 -4,312.14 5,978,910.351 647,564.282 0.98 5,953.50 9,920.39 47.03 313.52 7,100.74 7,035.91 4,129.26 -4,325.97 5,978,923.173 647,550.187 0.85 5,972.53 9,946.29 46.97 313.60 7,118.40 7,053.57 4,142.31 -4,339.70 5,978,935.944 647,536.200 0.32 5,991.45 9,972.29 46.82 313.65 7,136.17 7,071.34 4,155.41 -4,353.44 5,978,948.759 647,522.198 0.59 6,010.40 9,998.29 46.55 313.72 7,154.01 7,089.18 4,168.47 -4,367.12 5,978,961.544 647,508.257 1.06 6,029.30 10,024.29 46.32 313.80 7,171.93 7,107.10 4,181.50 -4,380.73 5,978,974.295 647,494.390 0.91 6,048.11 10,050.29 46.05 313.89 7,189.93 7,125.10 4,194.50 -4,394.26 5,978,987.013 647,480.599 1.07 6,066.85 10,076.29 45.87 313.97 7,208.00 7,143.17 4,207.47 -4,407.72 5,978,999.703 647,466.880 0.73 6,085.52 10,102.10 45.68 313.97 7,226.00 7,161.17 4,220.31 -4,421.03 5,979,012.271 647,453.312 0.74 6,104.00 7/24/2019 10.49:52AM Page 18 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,128.00 45.35 313.98 7,244.15 7,179.32 4,233.14 -4,434.33 5,979,024.828 647,439.758 1.27 6,122.46 10,154.00 45.02 314.03 7,262.48 7,197.65 4,245.95 -4,447.59 5,979,037.369 647,426.236 1.28 6,140.88 10,180.00 44.93 314.08 7,280.87 7,216.04 4,258.73 -4,460.80 5,979,049.876 647,412.774 0.37 6,159.24 10,206.00 44.90 314.14 7,299.28 7,234.45 4,271.51 -4,473.98 5,979,062.383 647,399.338 0.20 6,177.58 10,232.00 44.92 314.15 7,317.69 7,252.86 4,284.29 -4,487.15 5,979,074.897 647,385.911 0.08 6,195.92 10,258.00 45.00 314.09 7,336.09 7,271.26 4,297.08 -4,500.34 5,979,087.416 647,372.466 0.35 6,214.27 10,283.49 44.90 314.07 7,354.13 7,289.30 4,309.61 -4,513.28 5,979,099.678 647,359.279 0.40 6,232.26 10,309.10 44.80 314.14 7,372.29 7,307.46 4,322.18 -4,526.25 5,979,111.982 647,346.059 0.44 6,250.31 10,334.60 44.82 314.22 7,390.38 7,325.55 4,334.70 -4,539.14 5,979,124.242 647,332.920 0.23 6,268.26 10,360.10 44.78 314.29 7,408.47 7,343.64 4,347.24 -4,552.01 5,979,136.517 647,319.800 0.25 6,286.22 10,385.70 44.75 314.31 7,426.65 7,361.82 4,359.83 -4,564.91 5,979,148.843 647,306.647 0.13 6,304.23 10,411.10 44.78 314.30 7,444.68 7,379.85 4,372.33 -4,577.71 5,979,161.073 647,293.597 0.12 6,322.10 10,436.39 44.80 314.24 7,462.63 7,397.80 4,384.76 -4,590.47 5,979,173.248 647,280.590 0.18 6,339.90 10,461.90 44.98 314.12 7,480.70 7,415.87 4,397.31 -4,603.38 5,979,185.530 647,267.428 0.78 6,357.89 10,487.40 45.03 314.16 7,498.73 7,433.90 4,409.87 -4,616.32 5,979,197.823 647,254.236 0.23 6,375.91 10,513.20 44.95 314.30 7,516.98 7,452.15 4,422.59 -4,629.39 5,979,210.278 647,240.912 0.49 6,394.13 10,538.70 45.03 314.29 7,535.01 7,470.18 4,435.18 -4,642.29 5,979,222.603 647,227.757 0.31 6,412.15 10,564.29 45.22 314.17 7,553.07 7,488.24 4,447.83 -4,655.29 5,979,234.985 647,214.510 0.81 6,430.26 10,589.79 45.38 314.11 7,571.01 7,506.18 4,460.46 -4,668.29 5,979,247.341 647,201.251 0.65 6,448.37 10,615.29 45.50 314.07 7,588.90 7,524.07 4,473.10 -4,681.34 5,979,259.715 647,187.948 0.48 6,466.52 10,640.89 45.72 314.03 7,606.81 7,541.98 4,485.82 -4,694.49 5,979,272.164 647,174.546 0.87 6,484.80 10,666.49 45.95 314.03 7,624.64 7,559.81 4,498.58 -4,707.70 5,979,284.656 647,161.088 0.90 6,503.15 10,691.99 46.10 314.04 7,642.35 7,577.52 4,511.34 -4,720.89 5,979,297.141 647,147.640 0.59 6,521.48 10,717.49 46.25 314.04 7,660.01 7,595.18 4,524.12 -4,734.11 5,979,309.658 647,134.160 0.59 6,539.86 10,742.89 46.38 314.08 7,677.55 7,612.72 4,536.90 -4,747.31 5,979,322.161 647,120.705 0.52 6,558.21 10,768.39 46.50 314.11 7,695.12 7,630.29 4,549.76 -4,760.58 5,979,334.747 647,107.177 0.48 6,576.67 10,794.09 46.58 314.11 7,712.80 7,647.97 4,562.74 -4,773.98 5,979,347.456 647,093.524 0.31 6,595.30 7/24/2019 10,49:52AM Page 19 COMPASS 5000.1 Build 8 1 D .1001N - by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,819.70 46.70 314.19 7,730.38 7,665.55 4,575.71 -4,787.34 5,979,360.151 647,079.905 0.52 6,613.91 10,845.20 46.83 314.30 7,747.85 7,683.02 4,588.67 -4,800.65 5,979,372.840 647,066.337 0.60 6,632.47 10,870.89 47.00 314.38 7,765.40 7,700.57 4,601.79 -4,814.07 5,979,385.678 647,052.656 0.70 6,651.22 10,896.49 47.07 314.51 7,782.85 7,718.02 4,614.90 -4,827.44 5,979,398.521 647,039.020 0.46 6,669.94 10,921.79 47.13 314.67 7,800.07 7,735.24 4,627.91 -4,840.64 5,979,411.260 647,025.562 0.52 6,688.46 10,946.99 47.37 314.78 7,817.18 7,752.35 4,640.94 -4,853.79 5,979,424.012 647,012.154 1.00 6,706.95 10,972.19 47.48 314.85 7,834.22 7,769.39 4,654.02 -4,866.95 5,979,436.821 646,998.728 0.48 6,725.50 10,997.29 47.55 314.89 7,851.18 7,786.35 4,667.07 -4,880.07 5,979,449.611 646,985.349 0.30 6,744.00 11,022.39 47.72 314.96 7,868.09 7,803.26 4,680.17 -4,893.20 5,979,462.438 646,971.956 0.71 6,762.54 11,047.29 47.82 315.03 7,884.83 7,820.00 4,693.21 -4,906.24 5,979,475.206 646,958.658 0.45 6,780.97 11,072.29 47.97 315.02 7,901.59 7,836.76 4,706.33 -4,919.35 5,979,488.057 646,945.286 0.60 6,799.51 11,097.39 48.12 315.02 7,918.37 7,853.54 4,719.53 -4,932.54 5,979,500.990 646,931.828 0.60 6,818.17 11,122.49 48.23 315.01 7,935.11 7,870.28 4,732.76 -4,945.76 5,979,513.948 646,918.341 0.44 6,836.87 11,147.49 48.38 314.95 7,951.74 7,886.91 4,745.96 -4,958.97 5,979,526.872 646,904.873 0.63 6,855.53 11,172.60 48.43 314.90 7,968.41 7,903.58 4,759.22 -4,972.26 5,979,539.860 646,891.312 0.25 6,874.30 11,197.60 48.40 314.86 7,985.00 7,920.17 4,772.41 -4,985.51 5,979,552.782 646,877.798 0.17 6,892.99 11,222.60 48.37 314.78 8,001.60 7,936.77 4,785.59 -4,998.77 5,979,565.684 646,864.277 0.27 6,911.67 11,247.59 48.35 314.72 8,018.21 7,953.38 4,798.73 -5,012.04 5,979,578.560 646,850.751 0.20 6,930.34 11,272.70 48.30 314.69 8,034.90 7,970.07 4,811.93 -5,025.37 5,979,591.480 646,837.157 0.22 6,949.08 11,297.69 48.33 314.65 8,051.52 7,986.69 4,825.05 -5,038.64 5,979,604.328 646,823.623 0.17 6,967.74 11,322.70 48.37 314.65 8,068.14 8,003.31 4,838.18 -5,051.93 5,979,617.188 646,810.065 0.16 6,986.41 11,347.60 48.38 314.66 8,084.68 8,019.85 4,851.26 -5,065.17 5,979,629.998 646,796.564 0.05 7,005.01 11,372.49 48.45 314.67 8,101.20 8,036.37 4,864.35 -5,078.41 5,979,642.813 646,783.061 0.28 7,023.62 11,397.60 48.43 314.73 8,117.86 8,053.03 4,877.57 -5,091.77 5,979,655.755 646,769.442 0.20 7,042.40 11,422.60 48.37 314.84 8,134.46 8,069.63 4,890.74 -5,105.04 5,979,668.652 646,755.910 0.41 7,061.08 11,447.69 48.40 314.99 8,151.12 8,086.29 4,903.98 -5,118.32 5,979,681.623 646,742.362 0.46 7,079.83 11,472.79 48.35 315.19 8,167.79 8,102.96 4,917.27 -5,131.57 5,979,694.639 646,728.850 0.63 7,098.59 7/24/2019 10.49:52AM Page 20 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU ND Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,497.79 48.23 315.38 8,184.43 8,119.60 4,930.53 -5,144.70 5,979,707.631 646,715.454 0.74 7,117.25 11,522.89 48.10 315.55 8,201.17 8,136.34 4,943.86 -5,157.81 5,979,720.692 646,702.071 0.72 7,135.95 11,547.79 47.92 315.73 8,217.83 8,153.00 4,957.09 -5,170.75 5,979,733.658 646,688.867 0.90 7,154.45 11,572.49 47.78 315.92 8,234.40 8,169.57 4,970.23 -5,183.52 5,979,746.530 646,675.844 0.80 7,172.76 11,597.10 47.68 316.10 8,250.96 8,186.13 4,983.33 -5,196.16 5,979,759.372 646,662.934 0.68 7,190.97 11,621.60 47.60 316.31 8,267.46 8,202.63 4,996.40 -5,208.69 5,979,772.182 646,650.143 0.71 7,209.07 11,646.10 47.52 316.54 8,284.00 8,219.17 5,009.50 -5,221.16 5,979,785.025 646,637.418 0.77 7,227.16 11,670.60 47.40 316.73 8,300.56 8,235.73 5,022.62 -5,233.55 5,979,797.893 646,624.761 0.75 7,245.21 11,694.99 47.40 316.81 8,317.07 8,252.24 5,035.70 -5,245.85 5,979,810.721 646,612.202 0.24 7,263.16 11,719.60 47.45 316.83 8,333.72 8,268.89 5,048.92 -5,258.25 5,979,823.681 646,599.537 0.21 7,281.28 11,744.20 47.40 316.81 8,350.36 8,285.53 5,062.12 -5,270.64 5,979,836.636 646,586.876 0.21 7,299.40 11,768.79 47.47 316.81 8,367.00 8,302.17 5,075.33 -5,283.04 5,979,849.586 646,574.217 0.28 7,317.51 11,793.39 47.53 316.85 8,383.62 8,318.79 5,088.56 -5,295.45 5,979,862.559 646,561.543 0.27 7,335.65 11,817.99 47.57 316.90 8,400.22 8,335.39 5,101.81 -5,307.86 5,979,875.552 646,548.870 0.22 7,353.80 11,842.60 47.53 316.93 8,416.83 8,352.00 5,115.07 -5,320.26 5,979,888.559 646,536.201 0.19 7,371.96 11,867.20 47.43 316.94 8,433.46 8,368.63 5,128.31 -5,332.64 5,979,901.550 646,523.555 0.41 7,390.09 11,891.79 47.37 316.97 8,450.10 8,385.27 5,141.54 -5,345.00 5,979,914.525 646,510.936 0.26 7,408.19 11,916.39 47.37 316.98 8,466.76 8,401.93 5,154.77 -5,357.35 5,979,927.502 646,498.322 0.03 7,426.29 11,940.89 47.33 316.98 8,483.36 8,418.53 5,167.95 -5,369.64 5,979,940.424 646,485.764 0.16 7,444.30 11,965.60 47.23 316.98 8,500.13 8,435.30 5,181.22 -5,382.03 5,979,953.442 646,473.113 0.40 7,462.46 11,990.29 47.30 316.95 8,516.88 8,452.05 5,194.48 -5,394.40 5,979,966.443 646,460.472 0.30 7,480.59 12,014.60 47.32 317.02 8,533.36 8,468.53 5,207.54 -5,406.59 5,979,979.257 646,448.021 0.23 7,498.46 12,034.39 47.32 317.12 8,546.78 8,481.95 5,218.19 -5,416.50 5,979,989.706 646,437.898 0.37 7,513.01 12,048.10 47.33 317.17 8,556.07 8,491.24 5,225.58 -5,423.36 5,979,996.954 646,430.895 0.28 7,523.09 12,061.89 47.30 317.27 8,565.42 8,500.59 5,233.02 -5,430.24 5,980,004.253 646,423.861 0.58 7,533.22 12,075.70 47.35 317.33 8,574.78 8,509.95 5,240.48 -5,437.13 5,980,011.573 646,416.826 0.48 7,543.38 12,089.39 47.37 317.34 8,584.06 8,519.23 5,247.89 -5,443.95 5,980,018.838 646,409.853 0.16 7,553.45 7/24/2019 10:49:52AM Page 21 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: F -48A Survey Calculation Method: Minimum Curvature Design: F -48A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,103.20 47.30 317.45 8,593.41 8,528.58 5,255.36 -5,450.83 5,980,026.171 646,402.829 0.77 7,563.60 12,116.99 47.40 317.53 8,602.76 8,537.93 5,262.84 -5,457.68 5,980,033.506 646,395.826 0.84 7,573.74 12,130.79 47.52 317.57 8,612.09 8,547.26 5,270.34 -5,464.54 5,980,040.868 646,388.813 0.90 7,583.91 12,144.59 47.47 317.78 8,621.41 8,556.58 5,277.87 -5,471.39 5,980,048.249 646,381.813 1.18 7,594.08 12,158.29 47.48 318.03 8,630.67 8,565.84 5,285.36 -5,478.16 5,980,055.602 646,374.894 1.35 7,604.17 12,171.89 47.62 316.26 8,639.85 8,575.02 5,292.83 -5,484.86 5,980,062.938 646,368.049 1.62 7,614.21 12,185.49 47.57 318.43 8,649.02 8,584.19 5,300.34 -5,491.53 5,980,070.304 646,361.224 0.99 7,624.24 12,199.09 47.32 318.53 8,658.22 8,593.39 5,307.84 -5,498.17 5,980,077.668 646,354.433 1.92 7,634.26 12,212.59 47.25 318.52 8,667.38 8,602.55 5,315.27 -5,504.74 5,980,084.965 646,347.715 0.52 7,644.17 12,226.19 47.38 318.47 8,676.60 8,611.77 5,322.75 -5,511.37 5,980,092.315 646,340.940 0.99 7,654.16 12,239.79 47.40 318.59 8,685.81 8,620.98 5,330.25 -5,518.00 5,980,099.679 646,334.162 0.67 7,664.17 12,253.29 47.37 318.76 8,694.95 8,630.12 5,337.72 -5,524.56 5,980,107.005 646,327.452 0.95 7,674.09 12,266.79 47.27 318.84 8,704.10 8,639.27 5,345.18 -5,531.09 5,980,114.337 646,320.765 0.86 7,684.01 12,280.39 47.30 318.96 8,713.32 8,648.49 5,352.71 -5,537.66 5,980,121.732 646,314.046 0.68 7,694.00 12,293.99 47.42 319.03 8,722.54 8,657.71 5,360.26 -5,544.23 5,980,129.147 646,307.330 0.96 7,703.99 12,307.49 47.28 319.13 8,731.68 8,666.85 5,367.77 -5,550.73 5,980,136.516 646,300.676 1.17 7,713.91 12,320.99 47.18 319.31 8,740.85 8,676.02 5,375.27 -5,557.20 5,980,143.887 646,294.053 1.23 7,723.81 12,334.49 47.30 319.41 8,750.02 8,685.19 5,382.79 -5,563.66 5,980,151.275 646,287.447 1.04 7,733.71 12,347.99 47.45 319.48 8,759.16 8,694.33 5,390.34 -5,570.12 5,980,158.689 646,280.838 1.17 7,743.63 12,361.49 47.43 319.59 8,768.29 8,703.46 5,397.90 -5,576.57 5,980,166.122 646,274.233 0.62 7,753.56 12,374.99 47.37 319.77 8,777.43 8,712.60 5,405.48 -5,583.00 5,980,173.566 646,267.651 1.08 7,763.49 12,388.49 47.27 319.92 8,786.58 8,721.75 5,413.07 -5,589.40 5,980,181.019 646,261.099 1.10 7,773.39 12,401.99 47.32 320.00 8,795.73 8,730.90 5,420.66 -5,595.78 5,980,188.483 646,254.565 0.57 7,783.30 12,415.49 47.43 320.04 8,804.88 8,740.05 5,428.27 -5,602.16 5,980,195.963 646,248.030 0.84 7,793.21 12,428.99 47.37 320.10 8,814.01 8,749.18 5,435.89 -5,608.54 5,980,203.452 646,241.499 0.55 7,803.13 12,442.39 47.25 320.23 8,823.10 8,758.27 5,443.46 -5,614.85 5,980,210.885 646,235.038 1.14 7,812.96 7/24/2019 10:49:52AM Page 22 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: F Local Co-ordinate Reference: Well: F-48 Wellbore: F -48A Design: F -48A Survey TVD Reference: MD Inc KB @ 64.83usft (ORIG (usft) (°) 12,455.79 47.23 Tie -In Point 12,467.00 47.35 KOP - Top of Whipstock KELLY BUSHING) 12,488.69 51.86 Interpolated Azimuth 12,516.96 61.56 Interpolated Azimuth True 12,546.79 66.72 Interpolated Azimuth 12,571.67 73.05 First Clean Survey Method: 12,600.07 78.64 12,629.96 86.83 12,659.92 95.84 12,690.56 96.31 12,722.48 97.02 12,751.42 94.45 12,780.84 96.09 12,810.83 95.97 12,840.77 95.81 12,870.74 96.64 12,901.13 96.18 12,931.22 95.50 12,960.85 95.65 13,000.00 95.65 Projection to TD 320.34 BP Final Survey Report 7/24/2019 10:49:52AM Page 23 COMPASS 5000.1 Build 81D Local Co-ordinate Reference: Well F-48 TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 320.34 8,832.20 8,767.37 5,451.02 -5,621.14 5,980,218.324 646,228.600 0.62 7,822.78 320.38 8,839.80 8,774.97 5,457.37 -5,626.39 5,980,224.559 646,223.219 1.08 7,831.00 320.73 8,853.85 8,789.02 5,470.12 -5,636.88 5,980,237.097 646,212.472 20.84 7,847.48 324.50 8,869.36 8,804.53 5,488.90 -5,651.18 5,980,255.577 646,197.804 36.07 7,870.94 335.00 8,882.39 8,817.56 5,512.06 -5,664.62 5,980,278.460 646,183.892 36.07 7,897.00 341.19 8,890.95 8,826.12 5,533.72 -5,673.30 5,980,299.939 646,174.774 34.53 7,918.71 347.70 8,897.90 8,833.07 5,560.23 -5,680.66 5,980,326.291 646,166.880 29.68 7,943.02 355.28 8,901.68 8,836.85 5,589.51 -5,685.03 5,980,355.473 646,161.925 37.18 7,967.30 4.42 8,900.98 8,836.15 5,619.40 -5,685.11 5,980,385.352 646,161.236 42.81 7,989.07 15.10 8,897.73 8,832.90 5,649.38 -5,679.95 5,980,415.431 646,165.783 34.69 8,007.31 24.63 8,894.02 8,829.19 5,679.16 -5,669.19 5,980,445.424 646,175.936 29.74 8,021.56 34.74 8,891.12 8,826.29 5,704.14 -5,654.95 5,980,470.684 646,189.671 35.87 8,029.92 44.58 8,888.41 8,823.58 5,726.67 -5,636.28 5,980,493.582 646,207.880 33.77 8,033.46 56.24 8,885.25 8,820.42 5,745.64 -5,613.33 5,980,513.014 646,230.432 38.67 8,031.48 66.81 8,882.17 8,817.34 5,759.82 -5,587.19 5,980,527.718 646,256.278 35.12 8,023.82 77.86 8,878.91 8,814.08 5,768.84 -5,558.85 5,980,537.319 646,284.430 36.76 8,010.91 89.24 8,875.51 8,810.68 5,772.23 -5,528.89 5,980,541.310 646,314.312 37.24 7,992.79 100.53 8,872.43 8,807.60 5,769.68 -5,499.12 5,980,539.368 646,344.130 37.39 7,970.48 111.60 8,869.55 8,804.72 5,761.54 -5,470.82 5,980,531.796 646,372.581 37.19 7,945.12 111.60 8,865.69 8,800.86 5,747.19 -5,434.60 5,980,518.192 646,409.085 0.00 7,909.81 7/24/2019 10:49:52AM Page 23 COMPASS 5000.1 Build 81D Amaaumr�a Nunn Project PBU i WELLBORE DETAILS: F -48A REFERENCE INFORMATION : Magi Nodh 1878' Site: F MaWn Fina I F -48A C—dinate (NtE) Referenac. VNI FA8, Tme Nardi bpWell: F48 seerytn:57atzanTl Verfioal(TVD)Relerenae: K8@64.MSft(ORIGKELLYBUSHING) dP''' Wellbore: F4BA DipAnple 80941 Swton(VS)Reference. %ot-(B.00N,000E) ACtual: F -49A Date 7n2019, F-48 Measured Depth Refer— K8@64.83usR(ORIGKELLYBUBHING) Wodei BGGVQ01B Tie On MD: 12455.79 Celauledon Methods Minimum Cumtum AOGCC Offsets within 500ft Easting (300 usRlin) Easting (300 usf /in) North America - ALASKA - BP PBU F-48 F -48A F -48A 500292218701 AOGCC Offset Well Report 24 July, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: F Site Error: 0.00usft Reference Well: F-48 Well Error: 0.00usft Reference Wellbore F -48A Reference Design: F -48A BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well F-48 KB @ 64.83usft (ORIG KELLY BUSHING) KB @ 64.83usft (ORIG KELLY BUSHING) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference F -48A Filter type: NO GLOBAL FILTER Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 7/24/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 12,455.79 1 : Schlumberger GCT multishot (F-48) GCT -MS Schlumberger GCT multishot 12,467.00 13,000.00 Survey #1 (F -48A) MWD MWD - Standard 7/24/2019 10:57:54AM Page 2 of 3 COMPASS 5000 1 Build 81D BP Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Reference Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Site Error: 0.00usft North Reference: True Reference Well: F-48 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F -48A Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: F -48A Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) F F-11 - F-11 - F-11 1,472.68 1,475.00 300.85 F-11 - F -11A- F -11A 1,472.68 1,475.00 300.85 F-11 - F-11 B- F-11 B 1,472.68 1,475.00 300.85 F-12 - F-12 - F-12 1,522.87 1,525.00 188.23 F-12 - F -12A - F -12A 29.12 28.79 180.74 F-13 - F-13 - F-13 1,550.80 1,550.00 67.64 F-13 - F -13A- F-1 3A 1,550.80 1,550.00 67.64 F-13 - F-1 3B - F-1 3B 1,558.86 1,575.00 67.63 F-13 - F-13BPB1 - F-13BPB1 1,558.86 1,575.00 67.63 F-13 - F-1 3C - F-1 3C 1,558.86 1,575.00 67.63 F-14 - F-14 - F-14 1,799.30 1,800.00 20.22 F-30 - F-30 - F-30 1,380.93 1,400.00 328.16 F-30 - F -30A- F -30A 1,380.93 1,400.00 328.16 F-32 - F-32 - F-32 1,499.24 1,500.00 328.86 F-34 - F-34 - F-34 1,498.98 1,500.00 217.11 F-34 - F -34A- F -34A 1,498.98 1,499.98 217.11 F-34 - F-34APB1 - F-34APB1 1,498.98 1,499.98 217.11 F-34 - F -34B - F -34B 1,500.35 1,500.00 217.11 F-34 - F -34C - F -34C 1,500.35 1,500.00 217.11 F-36 - F-36 - F-36 4,094.65 4,425.00 418.95 F-36 - F-361-1 - F-361-1 4,094.65 4,425.00 418.95 F-36 - F-361-2 - F-361-2 4,094.65 4,425.00 418.95 F-36 - F-361-3 - F-361-3 4,094.65 4,425.00 418.95 F-37 - F-37 - F-37 1,498.08 1,500.00 153.38 F-37 - F -37A- F -37A 1,507.95 1,525.00 153.45 F-37 - F-37AL1 - F-37AL1 1,507.95 1,525.00 153.45 F-37 - F-37APB1 - F-37APB1 1,507.95 1,525.00 153.45 F-37 - F-37APB2 - F-37AP82 1,507.95 1,525.00 153.45 F-39 - F-39 - F-39 1,474.86 1,475.00 38.86 F-39 - F-391-1 - F-391-1 1,474.86 1,475.00 38.86 F-39 - F-391-1-01XX - F-391-1-01 29.12 28.82 35.88 F-41 - F-41 - F-41 1,499.49 1,500.00 131.07 F-41 - F-41 A - F-41 A 1,499.49 1,500.00 131.07 F-41 - F-41PB1 - F-41 P131 1,499.49 1,500.00 131.07 F-48 - F-48AP61 - F-48APB1 12,770.80 12,825.00 70.47 F-48 - F-48APB1 - F-481-1 WP04 12,998.59 13,075.00 8.21 F-48 - PLAN F-48AL1_OLD - F-48AL1 29.12 29.12 0.00 F-48 - PLAN F-48AL1_OLD - F-481-1-01 WP04 12,475.00 12,475.00 0.11 R UAT TEST SITE ONLY TEST WELL X_WP - TEST WELL - TEST WELL 1,498.08 1,500.00 153.38 TEST WELL X_WP - TEST WELL A - TEST WELL 1,507.95 1,525.00 153.45 TEST WELL X_WP - TEST WELLAPBI - TEST WELLAPBI 1,507.95 1,525.00 153.45 TEST WELL X_WP - TEST WELL APB2 - TEST WELLAPB2 1,507.95 1,525.00 153.45 7/24/2019 10: 57 54A Page 3 of 3 COMPASS 5000 1 Build BID TREE= 4-1/16"CIW WELLHEAD = 13-5/8" FMC - --------------------------- ACTIJATOR= OKB. ELEV = BAKER 64-83' BF- EEV = 35.7_1' Max Angle = Datum MD = 1800' 57° @ 4628' 12504' DatumTVD=--- 8809SS OPS SHU' :)WIN 20" CONDUCTOR, 112' ID= " 9-5/8" CSG, 47# L-80 HY D 563, ID = 9.875" 1742' 13-3/8" CSG, 68#, NT -80 BUTT, ID = 12.415" 2755' Minimum ID = 3.805" @ 12245' 4-1/2" PARKER SWN MILLED NIP 14-1/2" TBG, 12-6#, 13CR-80 VAM TOP, 12153' .0152 bpf, ID = 3.958" 4-112" TBG STUB (10/11/07) 12161' TOP OF 7" LNR 12196- 14-1/2- TBG, 12.6#, NT13-CR 12257' .0152 bpf, ® = 3.958" 9-5/8" CSG, 47#, NT -80S NSCC, ID= 8.681" 12461' 4-1/2" X 7- DELTA WHPSTOCK x!_/19) 12466- 14-1/2"X X 7" DELTA WHIPSTOCK (07/01/19) 12496' PERFORATION SUMMARY REF LOG: HLS BHCS ON 0729/91 ANGLE AT TOP PERF: 48° @ 12480' Note: Referb Production DB for historical perFdata SIZE SPF 1ITERVAL n/S z SHOT SQZ 2-7/8" 6 12480-12530 C 1222/16 2-0/8" 6 12480- 12510 C 03/19/92 3-3/8" 6 12653-12678 C 0927/91 - — -- PBTD 13093' - 7" LNR 26#. 13CR-80, .0383 bpf, ID = 6276" 13175' F _48A SAFE 3TES: —CHROME TBG & LNR'" NOTE: FoSTORICAL PROBLEMS RETRIEVING TOOLS JETHRU THE TAILPIPE DEFORMITY/ OBSTRUCTIONS IDENTIHED ON BHTV SURVEY 08/02/92 1732' 9-5/8" HES ES CEMENTER 2067' 4-1/2" HESX Np, ID= 3.813" GAS LIFT MANDRELS 3T MD I TVD DEV I TYPE I VLV LATCH I PORT DATE 5 3126 2976 41 MMG DMY RK 0 0522/19 4 6122 4772 52 MMG DMY RK 0 03/09/08 3 8144 5968 53 MMG DMY RK 0 0522/19 2 9721 6967 49 MMG DMY RK 0 10/21/07 1 11092 7915 48 MMG DMY RK 0 0522/19 12045' 1--�4-1/2" HES X NIP, ID= 3.813" 12065' - 9-5/8" X4-1 /2" CR S-3 PKR ID = 3.870" 12090' I—j4-1/2" HES X NIP, ID = 3.813" 12158' 975/8" X4-112" UNIQUE OVERSHOT 12169' RIGHT-HAND RELEASE LATCH 12170' 9-5/8" X4-1/2" TIW HBBP PKR ID = 3.875" 12195' —19-5/8" X 7" TM/ LNR HGR ID = ? 12223' �4-1 /2" PARKER SWS NIP, ID = 3.813" 12245' 14-1/2" PARKER SWN NIP MILLED TO 3.805" (6/15/19) 12257' I�4-112" WLEG, ID = 3.958" 12257' ELMD TT LOGG® 09/27/91 7 - MILLOUT WINDOW (F -48A) 12470' -' 12540' ELM 12550' ELM DATE REV BY COMMENTS DATE REV BY COMMENTS 08104191 N18E ORIGINAL COMPLETION 06/24/19 BTN/JMD MaL XN NIP, SET PLUG & TOC 10/22/07 N4ES RWO 07/15/19 JNUJMD SET WHIPSTOCK & MILL OH 12/18/18 CJN/JMD PULLED IBP/IBP STOP & REMO 0722/19 JNUJMD OPS SHUTDOWN 0721/19 12/18/18 JPK/JMD GLV C/O 06/08/18) 12/18/18 JMG/JMD GLV C/O 12/06/18 06/05/19 JPK/JMD GLV C/O (05/22/19) 13000' I --10H 12970' I--JOH TOC PLUG (06/17/19) 4-1/2" POSISET PLUG (06/17/19) PRUDHOE BAY UNIT WELL: F -48A PERMIT No: 219-100 API No: 50-029-22187-01 SEC 2, T11 N, R13E, 3362' FSL & 2863' FEL BP Exploration (Alaska) THE STATE V_W1041",_M11601,25 49 GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Leader — CTD & RWO BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU F -48A Permit to Drill Number: 219-100 Sundry Number: 319-348 Dear Mr. McLaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, J sie L. Chmielowski Commissioner DATED this 30 day of July, 2019. BDMS t'"' JUL 312019 SCANNED M63 0 1 2019 STATE OF ALASKA F KA OIL AND GAS CONSERVATION COMMISSIO Ar,PLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 JUL 2 3 niq 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ 4 a I;I Suspend ❑ Perforate ❑ Other Stimulate ElPull Tubing ❑ Change Approved Program 11 Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development M' 5. Permit to Drill Number: 219400 1 Address: P.O. Box 196612 Anchorage, AK 6. API Number: 50-029-22187-01-00 99519-6612 Stratigraphic ❑ Service ❑ 7, If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No M PBU F48A 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028280. 028277 & 028278 PRUDHOE BAY, PRUDHOE OIL 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13000 -8852 13000 -8852 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 32-112 32-112 Surface 2724 13-3/8" 31 -2755 31 -2678 5020 2260 Intermediate 12432 9-5/8" 29-12461 29-8836 6870 4760 Production Liner 275 7" 12195 - 12470 8655-8842 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): None 4-1/2" 12.6# 13Cr80 27-12257 Packers and SSSV Type: 4-1/2" Baker S-3 Packer Packers and SSSV MD (ft) and TVD (ft): 12071 /8572 4-1/2" TIW HBBP Packer 12170/8639 12. Attachments: Proposal Summary M Wellbore Schematic M 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development M ' Service ❑ 14. Estimated Date for Commencing Operations: July 21, 2019 15. Well Status after proposed work Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: 7/22/19 GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: Mel Rixse GINJ ❑ Op Shutdown M Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Ciolkosz, Ryan R be deviated from without prior written approval. Contact Email: Ryan.Ciolkosz@bp.com Authorized Name: Mclaughlin, Sean M Contact Phone: +1 907 564 5977 Authorized Title: Engineering Team Lead - CTD Authorized Signature: & ///T-�l/ In- J • Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: coq-�u� Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ❑l IBDMS AJUL 3 11019 Spacing Exception Required? Yes ❑ No G Subsequent Form Required:`Q i APPROVED BYTHE Approved by: ;� COMMISSIONER COMMISSION Date: q/ C� {�• -, _v r ORIGINAL %1tC_,; Zy3�%�-� Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. �& 7� /q -7z,� --,Submit Form and Attachments in Duplicate 10-403 Sunary Application for Well PBU F -48A PTD#2iy-100 Expected Start Date: July 21, 2019 To whom it may concern, F -48A and AU were originally planned to be dual lateral Sag wells. While drilling the F -48L1 lateral, hole instability was encountered in the Shublik and the drilling BHA was detained inside the 7" casing. The BHA was retrieved from the well bore and a new whipstock was set and cemented in place in an attempt to avoid the instability zone. While drilling the F -48A lateral, the rig continued to experience sloughing formation that was unable to be removed from the hole and continued to packoff around the BHA resulting in high over pulls. Several attempts were made to clean out the well unsuccessfully. We are concerned about continuing to progress forward and sticking another BHA below the tubing tail which could result in losing future wellbore utility. The plan is to take a step back and evaluate our options for this well going forward. Weare requesting approval for an Operations Shutdown. The second whipstock was set at 12465' and the F -48A lateral drilled to 13000' before the hole issues began. The rig swapped the well over to 8.6 ppg brine and 2500' of diesel freeze protect before leaving the well last night. Ryan Ciolkosz 907-244-4357 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 TRIS== 4-1/16" CNV WELLHEAD= 13-5/8" FMC ACTUATOR= BAKER OKB. B -EV = 64.83' BF. ELEV = 35.7_1' KOP = 180V Max Angle = 57" @ 4628' Datum MD = 12504' Datum TV 8800' SS OPS SHUTE VN 20" CONDUCTOR 112' ID " 9-5/8" CSG, 47# L-80 HY D 563, ® = 9.875" —1742- 13-3/8" CSG, 68#, NT -80 BUTT, ID = 12.415" 2755' Minimum ID = 3.805" @ 12245' 4-1/2" PARKER SWN MILLED NIP 4-1/2" TBG, 12.6#, 13C R-80 VA TOP, 12153' .0152 bpf, ID = 3.958" 4-1/2" TBG STUB (10/11/07) 12161' TOP OF 7" LNR 12195' 4-1/2" TBG, 12.6#, NT13-CR 1225T .0152 bpf, ® = 3.958" 9-5/8" CSG, 47#, NT -80S NSCC, ID = 8.681" 12461- 4-V2- X 7" DELTA WHIPSTOCK /19) 12465- 4-1/2- X 7" DELTA WHIPSTOCK (07/01/19) 12496' PERFORATION SUMMARY REF LOG: HLS BHCS ON 0729/91 ANGLE AT TOP PERF: 48" @ 12480' Note- Refertn Pnwhirtion DR for Nstmirat nerfdata SIZE SPF INTERVAL OpnfSqz SHOT SQZ 2-7/8" 6 12480-12530 C 1222/16 MMG 2-5/8" 6 12480-12510 C 03/19/92 4772 3-318" 6 12653-12678 C 0927/91 03/09/08 PBTD 13093' 7" LNR, 26#, 13C R-80, .0383 bpf, ID = 6.276" 13176- F -48A SAFETY ES: —CHROME TBG & LNR'** NOTE: HIS ORICAL PROBLEMS RETRIEVING TOOLS THRU THE TAILPIPE DEFORMITY I OBSTRUCTIONS IDENTIFIED ON BHN SURVEY 08/02/92 1732' 9-5/8" HES ES CEMENTER 2067' 41/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS iT MD I TVD DEV I TYPE I VLV LATCH PORT DATE 5 3126 2976 41 MMG DMY RK 0 0522/19 4 6122 4772 52 MMG DMY RK 0 03/09/08 3 8144 5968 53 MMG DMY RK 0 0522/19 2 9721 6967 49 MMG DMY RK 0 1021107 1 11092 7915 48 MMG DMY RK 0 0522/19 12045' j --d 4-1/2" HES X NP, ID = 3.813" 12065' 9-5/8" X4-1/2" CR S-3 PKR, ID = 3.870" _ _ _- 12090' j --j4-1/2" HESS X NP, ID = 3.813" 'i 12156' ! 9-5/8'X4-1/2" UNIQUE OVERSHOT 12169' RIGHT-HAND RELEASE LATCH 12170' 9-5/8" X4-1/2" TIW HBBP PKR, O = 3.875" 12195' —I9-5/8" X 7" TIW LNR HGR ID = ? 12223' 14-1/2" PARKER SWS NP, ID= 3.813" 12245' —14-1/2" PARKER SWN NIP MILLED ITO 3.805" (6/15119) 12257' 4-1/2" WLEG, ®= 3.958" 12257' ELMD TT LOGGED 09/27/91 7" MILLOUT WINDOW (F -48A) 12470' -' t' 13000' OH 12970' off 12540' ELM TOC PLUG (06/17/19) 12550' ELM 4-1/2" POSBET PLUG (06/17/19) DATE REV BY COMMENTS DATE REV BY COMMENTS 08/04/91 N18E ORIGINAL COMPLETION 06/24/19 BTN/JMD MILL XN NP, SET PLUG & TOC 10/22/07 N4ES RWO Wit 5/19 JNUJMD SET WHIPSTOCK & MILL OH 12/18/18 CJN/JMD PULLED IBP/BP STOP & REMO 0722119 JNUJMD OPS SHUTDOWN 0721/19 12/18/18 JPK/JMD GLV C/O 06/08/18 12/18/18 JMG/JMD GLV C/O 12/06/18 06/05/19 JPK/JMD GLV C/O (05/22/19) PRUDHOE BAY UNIT WELL: F -48A PERMIT No: 219-100 API No: 50-029-22187-01 EC 2, Tl lN, R13E, 3362' FSL & 2863' FEL BP Exploration (Alaska) 1 Davies, Stephen F (CED) From:Rixse, Melvin G (CED) Sent:Monday, July 22, 2019 1:46 PM To:Ciolkosz, Ryan R Cc:Davies, Stephen F (CED); Lastufka, Joseph N; Roby, David S (CED) Subject:RE: PTD #219-100/219-101 Ryan, BPXA has verbal approval for an operations shutdown. Please submit a 10‐403 describing the status of the well. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907‐793‐1231 Office 907‐223‐3605 Cell CONFIDENTIALITY NOTICE: This e‐mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e‐mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907‐793‐1231 ) or (Melvin.Rixse@alaska.gov). cc. Steve Davies, Dave Roby From: Ciolkosz, Ryan R <Ryan.Ciolkosz@bp.com> Sent: Monday, July 22, 2019 12:29 PM To: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com>; Sperry, Nathan <Nathan.Sperry@bp.com> Subject: PTD #219‐100/219‐101 Mel, F‐48A and AL1 were originally planned to be dual lateral Sag wells. While drilling the F‐48L1 lateral, hole instability was encountered in the Shublik and the drilling BHA was detained inside the 7” casing. The BHA was retrieved from the well bore and a new whipstock was set and cemented in place in an attempt to avoid the instability zone. While drilling the F‐48A lateral, the rig continued to experience sloughing formation that was unable to be removed from the hole and continued to packoff around the BHA resulting in high over pulls. Several attempts were made to clean out the well unsuccessfully. We are concerned about continuing to progress forward and sticking another BHA below the tubing tail which could result in losing future wellbore utility. The plan is to take a step back and evaluate our options for this well going forward. We are requesting approval for an Operations Shutdown. The second whipstock was set at 12465’ and the F‐48A lateral drilled to 13000’ before the hole issues began. The rig swapped the well over to 8.6 ppg brine and 2500’ of diesel freeze protect before leaving the well last night. Ryan Ciolkosz 907‐244‐4357 THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Sean McLaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 199612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU F -48A BP Exploration (Alaska), Inc. Permit to Drill Number: 219-100 Surface Location: 3362' FSL, 2863' FEL, SEC. 02, TI IN, R13E, UM Bottomhole Location: 3785' FSL, 1271' FEL, SEC. 34, T12N, R13E, UM Dear Mr. McLaughlin: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, TNP-L, lJ� Jessie L. Chmielowski Commissioner DATED this ) + day of July, 2019. E_CE ' "' STATE OF ALASKA 4LASKA OIL AND GAS CONSERVATION COMMI N JUL 15 Z�f PERMIT TO DRILL 20 AAC 25.005 REVISED: Approved Permit to.b I,/( /,, Drill name / API change la. Typq,ofp�q� ��q�* 10Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for: Drill "�4�dterAl "w✓LT- ` Stratigraphic Test ❑ Development - Oil Q Service - Wnj ❑ Single Zone Q Coalbed Gas ❑ Gas Hydrates ❑ Redrill Q Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket Q Single Well ❑ 11 Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 PBU F48A Address: 3. 6. Proposed Depth: l VP: X86 I �" 12. Field/Pool(s): ^ P.O. Box 196612 Anchorage, AK 99519-6612 MD: 1.r6 TVD: 15 7�9q PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property ues y anon (Lease Nu..._ _ , Y Kt B ADL 028280, 028277 & 028278 � wos Surface: 3362' FSL, 2863' FEL, Sec. 02, T11N, R13E, UM 8. DNR Approval Number: 13, Approximate spud date: 3538' FSL, 3198' FEL, Sec. 34, T12N, R13E, UM To of Productive Horizon: Top 87-035 Jwm-se-2019 '1 P Total Depth: 3785' FSL, 1271' FEL, Sec. 34, T12N, R13E, UM 9. Acres in Property: 2560 14. Distan to Nearest Property: 7824 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 64.83 feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 651959 y- 5974883 Zone - ASP 4 GL Elevation above MSL: 35.73 feet 180 16. Deviated wells: Kickoff Depth: 1 I7-4*116 1 feet At -jle/tq 17. Maximum Anticipated Pressures in prig (see 20 AAC 25.035) .0 ___% `oma Maximum Hole Angle: fie$ degrees Downhole: 3137 Surface: 2254 18, Casing Program: Specifications To - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade CouDlina Length MD TVD MD I TVD (including stage data) 4-1/4" 2-7/8" 6.5# L-80 STL 1777' 12647' 8853'ss 4Ad24 Uncemented Solid / Slotted Liner 7 . D, 19PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13175 9307 12496, 12540, 1 2550 12496 8859 12533,12540 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 260 sx Arctic Set (Aoorox.) 32-112 32-112 Surface 2724 13-3/8" 3790 cu ft Arctic Set II 31 -2755 31 -2678 Intermediate 12432 9-5/8" 2760 cu ft Class'G' 29-12461 29-8836 Production Liner 980 7" 296 cu It Class'G' 12195 - 13175 8655-9307 Perforation Depth MD (ft): 12480 - 12678 Perforation Depth TVD (ft): 8849-8981 Hydraulic Fracture planned? Yes ❑ No Q 20. Attachments Property Plat ❑ BOP Sketch Q Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements Q 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Ciolkosz. Rvan R from without prior written approval. Authorized Name Mclaughlin, Sean M Contact Email Ryan. Ciolkoszpbp.com Authorized Title Engineering Team Lead - CTD Contact Phone +1 907 564 5977 Authorized Signature S. m, Date .( t Commission Use Only Permit to Drill Z H O C7 API: 50- 029-22187-01-00 Permit Approval See cover letter for other Number: Y1�OC9 Date: ' requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, ga by tes, or gas contained in shales: Other: lbC9p I �� Y �d 3��D 1� 7 Samples req'd: Yes ❑p, No M Mud log req'd: Yes ❑ No H2S measures Yes L'1 No ❑ Directional svy req'd: Yes W No ❑ Spacing exception req'd: Yes ❑ No F� Inclination -only svy req'd: Yes ❑ No Post initial injection MIT req'd: Yes ❑ No ❑ y APPROVED BY Approved by: ( % COMMISSIONER THE COMMISSION Date: 1 I / l Form 10-401 Revised 5/2017 This permit i5 valid for 24 m�plhRUGle '.'^0 AAC 25.005 Submit Form and P my$v�l.lf (gI) Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz,b p CTD Engineer x ,N.ay Date: July 15, 2019 Re: F -48A L1 Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well F-48 with the Nabors CDR2 Coiled Tubing Drilling rig on or around July 16th, 2019. 11( The parent well, F-48, has no remaining value and there are no good opportunities to add new perforations to improve well performance. Proposed plan: Drill a through tubing sidetrack with the CDR 2 coil tubing drilling rig on or around July 16th, 2019. CDR 2 will set a whipstock and downsqueeze cement into the F-48 perforations and F-48APB1, then mill a 3.80" window through the 7" casing and drill the F -48A Sag lateral. CDR2 will then run slotted liner and set a billet at i 12647' MD. The rig will then drill F -48A L1, a second lateral, and complete with a slotted liner tied back into the F - 48A parent bore. CTD Drill and Complete F -48A & F-48AL1 program Rig Work: 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. (MASP 2254psi) 2. Set Whipstock and down squeeze cement around whipstock. Mill 3.80" window and 10' of rathole. Swap to 8.6 drilling mud 3. Drill 4-1/4" Build and lateral with GR/Resistivity to F -48A TD 4. Run 2-7/8" 6.4# L-80 Solid/Slotted liner to within —650' of TD 5. Set flow through billet at 12647' MD 6. Drill L1 4-1/4" build and lateral with GR/Resistivity to F-48AL1 TD 7. Run Solid/Slotted 2-7/8" 6.4# L-80 liner to within —150' of TD 8. Freeze protect well, RDMO Post -Rig Work: 1. V: Pull BPV if set. Tree Work as necessary 2. S: Set Live GLVs. 3. T: New well flowback up to 5 days Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (715 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. F-48AL1 Liner Program: • Openhole 14,093 MD — 13,943' MD • 2-7/8", 6.5#, STL, L-80 slotted liner: 13,943' MD —12,830' MD • 2-7/8", 6.5#, STL, L-80 solid liner: 12,830' MD — 12,550' MD • 3-1/4", 6.6#, STL, 13Cr solid liner: 12,550' MD —12,200' MD • The primary barrier for this operation: a minimum EMW of 8.4 ppg (715 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 104', inclination at kick off point is 48°. • Magnetic and inclination surveys will betaken every 30 ft. • Distance to nearest property —9,550' • Distance to nearest well within pool —508' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Anti -Collision Failures: • All wells pass BP Anti -Collison Risk Requirements. Hazards: • F pad is an H2S pad. • No potential fault crossing are expected. • Lost circulation risk is considered Low. Reservoir Pressure: • The reservoir pressure on F-48AL1 is expected to be 3137 psi at 8819' TVDSS (6.84 ppg equivalent). MPD • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2254 psi. �/C l • A min EMW of 8.4 ppg for this well will provide 715 psi over -balance to the reservoir. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka 564-5977 North America - ALASKA - BP PBU F-48 F-48AL1 Plan: F-48AL1 WP04 BP Coil Tubing Report 19 April, 2019 Company: North America - ALASKA- BP Project: PBU Site: F Well: F-48 Wellbore: PLAN F-48ALl Design: F-48ALl WP04 BP BP Coil Tubing Report Local Co-ordinate Reference: Well F-48 TVD Reference: Mean Sea Level MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 ' OGP-Usa AK [4267'158641 Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site F, TR -11-13 Site Position: From: Map Position Uncertainty: 0.00 usft Well F-48, F-48 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore PLAN F-48ALl Magnetics Model Name Sample Date BGGM2018 7/1/2019 Design F-48ALl WP04 Audit Notes: Version: Vertical Section: Northing: 5,972,527.290 usft Easting: 650,960.700 usft Slot Radius: 0.000 in Northing: 5,974,882.730 usft Easting: 651,958.630 usft Wellhead Elevation: 35.71 usft Declination 1°I 16.78 Phase: PLAN Depth From (TVD) +N/ -S (usft) (usft) -35.71 0.00 Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: Dip Angle Field Strength 1°I (nT) 80.94 57,422 Tie On Depth: 12,653.00 +E/ -W Direction (usft) (I 0.00 90.00 70' 19' 55.283 N 148' 46' 31.468 W 1.15 ' 70° 20' 18.248 N 1480 46'0.940 W 35.73 usft 4/19/2019 12: 12 35P Page 2 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: PBU Site: F TVD Reference: Mean Sea Level Well: F-48 Wellbore: PLAN F-48ALl KB @ 64.83usft (ORIG KELLY BUSHING) Design: F-48ALl WP04 Survey Tool Program Date 4/19/2019 True From To Survey Calculation (usft) (usft) Survey (Wellbore) 50.00 12,455.79 1 : Schlumberger GCT multishot (F-48) 12,455.79 12,653.00 F -48A WP04 (PLAN F -48A) 12,653.00 14,093.00 F-48ALl WP04 (PLAN F-48AL1) Planned Survey Tool Name Description MD Inc Azi TVDSS (usft) (°) (°) (usft) 12,653.00 90.00 346.88 8,852.58 KOP 12,693.00 99.85 336.89 8,849.14 2 12,700.00 100.27 334.43 8,847.92 12,800.00 103.88 298.80 8,826.34 12,900.00 102.40 262.86 8,802.88 12,908.00 102.06 260.01 8,801.18 3 646,144.257 0.00 -5,702.51 13,000.00 95.61 250.95 8,787.03 13,078.30 90.00 243.39 8,783.19 4 -5,717.68 5,980,408.374 646,128.192 13,100.00 90.05 246.00 8,783.19 13,200.00 90.25 258.00 8,782.92 13,300.00 90.45 270.00 8,782.31 13,400.00 90.62 281.99 8,781.37 13,493.00 90.76 293.15 8,780.24 5 35.00 -5,885.17 -96.56 13,500.00 90.74 292.31 8,780.15 13,600.00 90.41 280.32 8,779.14 13,700.00 90.06 268.32 8,778.73 BP BP Coil Tubing Report 4/19/2019 12:12:35PM Page 3 COMPASS 5000 1 Build 81D Local Co-ordinate Reference: Well F-48 TVD Reference: Mean Sea Level MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Tool Name Description GCT -MS Schlumberger GCT multishot MWD MWD - Standard MWD MWD - Standard NIS EIW Northing Easting DLeg V. Sec TFace (usft) (usft) (usft) (usft) (°I100usft) (usft) (°) 5,599.01 -5,702.51 5,980,364.625 646,144.257 0.00 -5,702.51 0.00 5,636.80 -5,714.84 5,980,402.154 646,131.159 35.00 -5,714.84 -45.00 5,643.08 -5,717.68 5,980,408.374 646,128.192 35.00 -5,717.68 -80.00 5,713.04 -5,783.51 5,980,476.977 646,060.964 35.00 -5,783.51 -80.43 5,730.91 -5,877.44 5,980,492.942 645,966.698 35.00 -5,877.44 -88.12 5,729.75 -5,885.17 5,980,491.622 645,958.993 35.00 -5,885.17 -96.56 5,706.93 -5,973.02 5,980,467.032 645,871.634 12.00 -5,973.02 -125.00 5,676.61 -6,045.01 5,980,435.260 645,800.273 12.00 -6,045.01 -126.40 5,667.34 -6,064.63 5,980,425.592 645,780.852 12.00 -6,064.63 89.00 5,636.49 -6,159.56 5,980,392.827 645,686.573 1200. -6,159.56 8900 5,626.05 -6,258.82 5,980,380.378 645,587.545 12.00 -6,258.82 89.03 5,636.47 -6,358.09 5,980,388.787 645,488.094 12.00 -6,358.09 89.11 5,664.51 -6,446.61 5,980,415.020 645,399.036 12.00 -6,446.61 89.22 5,667.21 -6,453.06 5,980,417.593 645,392.529 12.00 -6,453.06 -91.50 5,695.25 -6,548.85 5,980,443.686 645,296.196 12.00 -6,548.85 -91.51 5,702.77 -6,648.39 5,980,449.188 645,196.538 12.00 -6,64839 -91.63 4/19/2019 12:12:35PM Page 3 COMPASS 5000 1 Build 81D 4/19/2019 12: 12 35P Page 4 COMPASS 5000.1 Build BID BP by BP Coil Tubing Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well F-48 Project: PBU TVD Reference: Mean Sea Level Site: F MD Reference: KB @ 64.83usft (ORIG KELLY BUSHING) Well: F-48 North Reference: True Wellbore: PLAN F-48ALl Survey Calculation Method: Minimum Curvature Design: F-48ALl WP04 Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi TVDSS N/S EM Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (0/100usft) (usft) (°) 13,793.00 89.74 257.17 8,778.89 5,691.05 -6,740.50 5,980,435.600 645,104.690 12.00 -6,740.50 -91.68 6 13,800.00 89.72 258.01 8,778.92 5,689.55 -6,747.33 5,980,433.958 645,097.888 12.00 -6,747.33 91.00 13,900.00 89.52 270.01 8,779.59 5,679.12 -6,846.60 5,980,421.528 644,998.857 1200 -6,846.60 91.00 14,000.00 89.34 282.01 8,780.59 5,689.57 -6,945.87 5,980,429.957 644,899.409 12.00 -6,945.87 90.92 14,093.00 89.20 293.17 8,781.78 5,717.62 -7,034.37 5,980,456.208 644,810.357 12.00 -7,034.37 90.80 TD at 14093.00 4/19/2019 12: 12 35P Page 4 COMPASS 5000.1 Build BID North America - ALASKA - BP PBU F-48 F-48AL1 F-48AL1 WP04 Anticollision Summary Report 27 June, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: F Site Error: 0.00usft Reference Well: F-48 Well Error: 0.00usft Reference Wellbore F-48AL1 Reference Design: F-48ALl WP04 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well F-48 Mean Sea Level KB @ 64.83usft (ORIG KELLY BUSHING) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference F-48ALl WP04 Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 12,653.00 to 14,093.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,606.39usft Error Surface: Elliptical Conic Survey Tool Program Date 6/27/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 12,455.79 1 : Schlumberger GCT multishot (F-48) GCT -MS Schlumberger GCT multishot 12,455.79 12,653.00 F -48A WP04 (F -48A) MWD MWD - Standard 12,653.00 14,093.00 F-48ALl WP04 (F-48AL1) MWD MWD - Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) F F-12 - F-1 2A - F-1 2A Out of range F-30 - F-30 - F-30 Out of range F-30 - F -30A - F -30A Out of range F-36 - F-36 - F-36 Out of range F-36 - F-361_1 - F-361_1 Out of range F-36 - F -36L2 - F-361_2 Out of range F-36 - F-361_3 - F-361_3 Out of range F-37 - F -37A - F -37A 12,728.00 13,300.00 1,072.09 351.75 732.75 Pass - Major Risk F-37 - F-37AL1 - F-37ALl 12,728.00 13,300.00 1,072.09 351.75 732.75 Pass - Major Risk F-37 - F-37APB1 - F-37APB1 12,728.00 13,300.00 1,072.09 351.75 732.75 Pass - Major Risk F-37 - F-37APB2 - F-37APB2 12,728.00 13,300.00 1,072.09 351.75 732.75 Pass - Major Risk F-39 - F-39 - F-39 14,093.00 13,275.00 508.19 419.86 134.33 Pass - Major Risk F-39 - F-391_1 - F -39L1 14,093.00 13,275.00 508.19 419.86 134.33 Pass - Major Risk F-39 - F-391-1-01XX - F-391-1-01 Out of range F-48 - F-48 - F-48 12,762.77 12,875.00 221.23 12.30 221.23 Pass - NOERRORS F-48 - F48A - F48A WP04 12,674.67 12,675.00 2.71 0.02 2.71 Pass - NOERRORS R R-34 - R-34 - R-34 13,378.00 14,075.00 1,417.75 384.22 1,034.82 Pass - Major Risk R-42 - R-42 - R-42 12,878.00 16,500.00 928.57 307.23 622.72 Pass - Major Risk T T-01 - T-01 - T-01 13,737.75 9,575.00 1,269.85 705.63 643.84 Pass - Major Risk UAT TEST SITE ONLY TEST WELL X_WP - TEST WELL A - TEST WELL 12,728.00 13,325.00 1,074.42 399.09 686.45 Pass - Major Risk TEST WELL X_WP - TEST WELL APB1 - TEST W 12,728.00 13,325.00 1,074.42 399.09 686.45 Pass - Major Risk TEST WELL X_WP - TEST WELL APB2 - TEST W 12,728.00 13,325.00 1,074.42 399.09 686.45 Pass - Major Risk 6/27/2019 2:16:54PM Page 2 of 3 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: PBU Reference Site: F Site Error: 0.00usft Reference Well: F-48 Well Error: 0.00usft Reference Wellbore F-48ALl Reference Design: F-48ALl WP04 BP Anticollision Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well F-48 Mean Sea Level KB @ 64.83usft (ORIG KELLY BUSHING) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum reference Depths are relative to KB @ 64.83usft (ORIG KELLY Coordinates are relative to: F-48 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK ;entral Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.16° 1 Ladder Plot 0 2500 5000 L E G7L5QQ D 10000 12500 15000 Measured Depth (2500 usftfin) -'W, TESTWELL A, TEST WELL A VO F-36,F-361-3,F-3613VO - - F-30, F-30, F-30 V1 TEST WELL APB2, TEST WELL APB2 VO $ F-36, F-361-1, F -36L1 VO $ F-30, F -30A, F -30A VO TEST WELL APB I, TEST WELLAPB1VO $ F-48, F-48, F-48 V1 R-44, R-44, R-44 VO 11 V4 $ F-48,F-48AWP04V0 $- F -14,F -14,F -14V1 -1 AV3- F-37, F-37, F-37 V1 $ F-13,F-13C,F-13CVO -11 B V2 -rte F-37,F-37AL1,F-37AL1 VO F-13, F-1 3BPB1, F-1 3BPB1 VO 11 V1 .. F-37, F -37A, F -37A VO -r}- F-13, F-13, F-13 V 1 -1 2A VO $ F-37, F-37APB1, F-37AP131 VO F-13, F -13A, F -13A VO 3 V1 $ F-37, F-37APB2, F-37APB2 VO F-13, F-1 3B, F-1 3B VO -34BV22 T-01, T-01 , T-01 V1 F-41, F-41 , F-41 VO 6/27/2019 2:16.54PM Page 3 of 3 COMPASS 5000.1 Build 81D bp 0 -- Project: PBU ---.WELL DETAILS: F-48 _ WELLBORE DETAILS: PLAN F-48AL� -- I� REFERENCE INFORWTION Dleg TFace VSect Target Azimuths to True Nodh MagneticNodh: 16.78*� 7400 F-3741.1 . I-01, h Site: F Well: F48 Wellbore: PLAN F-48AL1 Design: F-48ALl WP04 Ground Level: 35.73 Northing: 5974882.730 Eastin 651958.630 N i, LongiLaffitude: 148tude: 70' ' 46' 0.940 W- �I1 Parent Wellbore: PLAN F-48A� Tie on MD: 12653.00 -8.248 Coordinate(N1E): Well F48, True North Vedical(ND): Mean Sea Level Calculatiepth on Method: hod: Mni@64.83 sft(0 GKELLYBUSHING) Magnetic Field streDipM&:86.94' I� -M. DateGGM2019 Sec MD Inc Azi SECTION DETAILS ssTVD +NIS +EI -W Dleg TFace VSect Target ANNOTATIONS TVD MD Annotation 7400 F-3741.1 . I-01, h 1 12653.00 90.00 346.88 8852.58 5599.01 -5702.51 0.00 0.00 -5702.51 8852.58 12653.00 KOP 7200 F -37A 2 12693.00 99.85 336.89 8849.14 5636.80 -5714.84 35.00 -05.00 -5714.84 8849.14 12693.00 2 a 3 12908.00 102.06 260.01 8801.18 5729.75 -5885.17 35.00 -80.00 -5885.17 8801.18 12908.00 3 7000 4 13078.30 90.00 243.39 8783.19 5676.61 -6045.01 12.00 -125.00 -6045.01 8783.19 13078.30 4 5 13493.00 90.76 293.15 8780.24 5664.51 -6446.61 12.00 89.00 -6446.61 8780.24 13493.00 5 6 13793.00 89.74 257.17 8778.89 5691.05 -674050 12.00 -91.50 -6740.50 8778.89 13793.00 6 6800 I. 7 . 14093.00 --- 89.20 _ 293.17 - 8781.78 5717.62 -7034.37 _. _.. -- -_ 12.00 91.00 -7034.37 __ _ -- - _.-_ 8781.78 14093.00 TO at 14093.00 c o 8550 8600 8650 7 O W1 8700 '-"8750 N 8800' 8850 O 8900 7 w `it 8950 9000 F-48AL1 WP04 TD at 14093 00 I 6600 F-48AL �,.. O 6400 O N \ ^6200 v 85(10 P-,91.1 6000 i O F-39 5800- 00 F-48ALI WP04 J 5600 TD at 14093.00 6 5 4 3 KOP C so11 r-49AWPo4 5400 J 5200 50001 o 41 4800 i R-44 46001 78007600 7400 -7200 -7000 -6800 -6600 -6400 6200 6000 -5800 -5600 -54 - 00 -5200 -5000 -0800 -0600 -4400 4200 West( -)/East(+) (200 usft/in) I �\ KOP 3 1 2 7*aD`§* 0Y.4 -7100 -7050 -7000 6950 6900 -6850 6800 6750 -6700 6650 -6600 -6550 6500 -6450 -6400 6350 6300 6250 6200 6150 -6100 6050 -6000 -5950 -5900 -5850 -5800 -5750 -5700 -5650 -5600 -5550 -5500 -5450 -5400 -5350 -5300 -5250 -5200 Vertical Section at 90.00° (50 usft/in) Project: PBU bp Site: F 0 Well: F-48 Wellbore: PLANF-48ALI Plan: F-48AL1 WP04 a1 F-48 ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 12653.00 To 14093.00 Error System: ISCWSA Results Limited By: Centre Distance: 1606.39 Scan Method: Tray. Cylinder North Reference: Plan: F-48ALi WP04 (F-48/PLAN F-48AL1) Error Surface: EllipticalConic W W Warning Method: Rules Based +r. 60_�00 From Colour To MD 12653 12750 12750 12800 12800 14000 14000 14093 N N N N N N N W E.1 j j W W W W W W W W W W W W W W W W A A EP [P J O J 00 e0 w O N O EO N O O O N O N N O N W W A A N N O N O N O N En N O 0, J N O J (b DO O ED O O j N O N O Elf O M O O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O Measured Depth (50 usfVin) + TEST LL% WP , TEST .-TEST V.eWEu TEST—A s TESTY.ELL%WP TESTWELLAPB25TESTWELLAPB3v0+F-34,F WELLWELL . TEST TF V1 LAVD + F -3f, F34 Vt2 -e Fa4. F-3a,F-16 a APB1FJ]AP , 91 V6 eF-37, F-3)APB2. F-2 Vo + -13C 13, F, F -13C VO ,. F-13BP91. F13BPB1 Vo SURVEY PROGRAM North America - ALASKA - BP Wv, TEST PE1,F PET,6 WELLAPS1, TEST W LAPBI W « "Sr Foe, F36 V1 +Tat,—TL V1 . F-39. 1-39. Fl. v1 F -13,F -13,F-13 V1 - F-1BA, F1-0 Depth From Depth To Survey/Plan Tool - 11 a Fos, F, F-]612 VO : F.3T F-1. F-1 VD F.13B, B VD —B, 50.00 12455.79 1 : Schlumberger GCTmultishot (F-48) GCT -MS F -11A _I 'A V3V4 afiF-36-]6L2u, F—VD +F..�m, FaeL 1xx, FaDL VO aFa3F-01.—VB 12455.79 12653.00 F -48A WP04 (PLAN F -48A) MWD . Fn. FnS, -8 V2 +F-t2F-t 2,F-12 V1 F 12 F-32AF]2NV1V0 aF-3a, PUN F -34C, F -]4C ]4 + F , F�40, F -34B V22 WP02 VD + a 1 F1.1. + CB, --V1 a—VO F-37 V1 . —AL1 FJ D ], —A, Fa2ATV01 V R.42 R,2, RA2VE aR�34.—R-34 V1 a ,F-3WF11.vE + MVD « F -1M4, F-14, F-14 V1 — ru, F41A V0 – 1PB1 V0 a FiML1 WP04 12653.00 14093.00 F-48ALl WP04 (PLAN F-48AL1) MWD Project: PBU Site: F WELL DETAILS ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA- BP - Ground Level: 35.73 Interpolation Method: MD,intewal:25.00 Calculation Method: Minimum Curvature Well: F-48 Norhting: 5974882.730 Depth Range From: 12653.00 To 14093.00 Error System: ISCWSA Wellbore: PLAN F-48AL1 Easting: 651958.630 Results Limited By: Centre Distance: Scan Method: Tray. Cylinder North Plan: F-48AL1 WPO4 Lattitude: 70° 20' 18.248 N 1606.39 Reference: F48ALI WP04 Error Surface: EllipticalConlc Warning Method: Rules Based 90.00 Longitude: 148° 46' 0.940 W 8852.58 5599.01 -5702.51 0.00 )00 )93 11 SURVEYPROGRAM Depth From SECTION DETAILS Tool 50.00 Sec MD Inc Azi TVD -NIS +E/ -W Oleg TFace VSect 12653.00 1 12653.00 90.00 34638 8852.58 5599.01 -5702.51 0.00 0.00-5702.51 2 12693,00 99.85 336.89 8849.14 5636.80 -5714.84 35.00 -45,00 -5714.84 4D 3 12908.00 102.06 260.01 8801.18 5729.75 -5885.17 35.00 50.00 -5885.17 4 13078.30 90.00 243.39 8783.19 5676.61 5045.01 12.00 -125.005045,01 '50 5 13493.00 90.76 293.15 8780.24 5664.51 5446.61 12.00 89.00 5446.61 6 13793.00 89.74 257.17 8778,89 5691.05 5740.50 12.00 51.50 5740.50 100 7 14093.00 89.20 293.17 8781.78 5717.62 -7034.37 12.00 91.00 -7034.37 )00 )93 11 Depth Range: 12653.00 To 14.093.00 (NO 3�/ - - 220 \_ ' 200 301 180 160 F -48A WP04 140 300/ A 60 VVPO 92 31 100` ° / 80 12744 60 40 180 Azimuth from North [°] vs CetcltFto Centre Separation [10 usftlin] F -7d. PLAN F -34C, F3 - VO F-36, F-36, F-36 V1 FAB, PUN F -4M - VB F-37, -AM F-37APB2 V0 R-42, R-42, R-42 V0 F->•, F -34B, F-340 V. IM, I... F -36L2 V0 F-37, F-37, F-37 Vt T-01, T-01. T41 Vt -4, R -3A R-34 VI F-34. FJ4. F-34 V12 F-36, F -36L3, F -36L3 W F-37, F-37AL1, F-37AL1 V0 F-39, F-39, F-39 V1 F-30 F-30. F-30 V1 F-34, F -34A, F -3W Vt6 F-36, F-360, F -36L1 V0 F-37, F -37A. F-37AW F-39, F -39L1, F -39L1 VC 1. FJM, F -3M Vo F-34, -01 F-3MP91 V16 FAB, FAB, FAB V1 F-37, F-37APB1, F-37APB1 Vo F- ib, F -39L1-0119!, F -19L1-01 VO R -d4, R -N. R-44 V0 A_ - 180 Azimuth from North [°J vs Centre to Centre Separation [30 usf /in] -, F-14, F-14 V1 F-13, FAX, F -13C Vo F-13, F-13BPB1. F-13BPB1 Vo F-13, F-13, F-13 V1 FAA, FAA. F.13AV0 90 !0 F-13. F -13B, P -13B Vo F-41, -, F41 VB F-41, F -41A. F -41A V0 F-41, F-81. F PB1 VB F-1 V/Po4 SURVEYPROGRAM Depth From Depth To Survey/Plan Tool 50.00 12455.79 1,SchlumbergerGCTmultishot(F48) GCT -MS 12455.79 12653.00 F48A WP04 (PLAN F48A) MWD 12653.00 14093.00 F48AL1 WP04 (PLAN F48AL1) MWD Depth Range: 12653.00 To 14.093.00 (NO 3�/ - - 220 \_ ' 200 301 180 160 F -48A WP04 140 300/ A 60 VVPO 92 31 100` ° / 80 12744 60 40 180 Azimuth from North [°] vs CetcltFto Centre Separation [10 usftlin] F -7d. PLAN F -34C, F3 - VO F-36, F-36, F-36 V1 FAB, PUN F -4M - VB F-37, -AM F-37APB2 V0 R-42, R-42, R-42 V0 F->•, F -34B, F-340 V. IM, I... F -36L2 V0 F-37, F-37, F-37 Vt T-01, T-01. T41 Vt -4, R -3A R-34 VI F-34. FJ4. F-34 V12 F-36, F -36L3, F -36L3 W F-37, F-37AL1, F-37AL1 V0 F-39, F-39, F-39 V1 F-30 F-30. F-30 V1 F-34, F -34A, F -3W Vt6 F-36, F-360, F -36L1 V0 F-37, F -37A. F-37AW F-39, F -39L1, F -39L1 VC 1. FJM, F -3M Vo F-34, -01 F-3MP91 V16 FAB, FAB, FAB V1 F-37, F-37APB1, F-37APB1 Vo F- ib, F -39L1-0119!, F -19L1-01 VO R -d4, R -N. R-44 V0 A_ - 180 Azimuth from North [°J vs Centre to Centre Separation [30 usf /in] -, F-14, F-14 V1 F-13, FAX, F -13C Vo F-13, F-13BPB1. F-13BPB1 Vo F-13, F-13, F-13 V1 FAA, FAA. F.13AV0 90 !0 F-13. F -13B, P -13B Vo F-41, -, F41 VB F-41, F -41A. F -41A V0 F-41, F-81. F PB1 VB F-1 V/Po4 WELLHEAD = 13-5/8" FMC ACTUATOR = VLV OKB. ELEV = 64.83' BF- ELEV = 35.71' KOP = 1800' Max Angle = _" @ Datum MD = 05/22/19 Datum TVD = 8800' SS PROPOSEL F -48A & F-48AL1 20" CONDUCTOR 112' ID= — 9-5/8" CSG, 47# L-80 HYD 563, ID = 9.875" 1742' 13-3/8" CSG, 68#, NT -80 BUTT, ID = 12.415" 2755 - Minimum ID = 3.725" @ 12245' 4-1/2" PARKER SWN NIPPLE SAP VOTES:—CHROME TBG& LNR"' NOTi- -jSTORICAL PROBLEMS RETRIEVING TOOLS THRU THE TAILPIPE. DEFORMITY/ OBSTRUCTIONS IDENTIFIED ON BHTV SURVEY 08/02/92 1732' 9-5l8" HES ES CEMENTER 2057' 4-1 /2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3126 2976 41 MMG DMY RK 0 05/22/19 4 6122 4772 52 MMG DMY RK 0 03/09/08 3 8144 5968 53 MMG OMY RK 0 05/22/19 2 9721 6967 49 MMG OMY RK 0 10/21/07 1 11092 7915 1 48 MMG DMY RK 0 05/22/19 12045- 1--{4-1/2- HES X NIP, ]D=3.813- 12066- D=3.813" 12065- 1--� 9-5/8" X4-1/2" CR S-3 PKR, ID = 3.870" 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, 12153' 12090' 14-1 /2" HES X NIP, ID = 3.813" I .0152 bpf, D = 3.958" 4-1/2" TBG STUB (10/11/07) 12161' 12163' 9-5/8" X4-1/2" UNIQUE OVERSHOT 12169' RIGHT-HAND RELEASE LATCH 12170' 9-5/8" X4-1/2' TIW HBBP PKR, ID = 3.875" TOP OF 7" LNR I 12195' TOPOF_LNR 12200' 4-1/2" TBG, 12.6#, NT13-CR 1225T 0152 bpf, D = 3-958" 9-5/8" CSG, 47#, NT -80S NSCC, D = 8-681" 1-� 12461' 4-1/2" X 7" DELTA WHIPSTOCK I3-1/4" LNR, _#, 13CR-85 TCI, ._ bpf, D = I- 12550' BILLET (_r_r_� 1264T 4-1/2" X 7" DELTA WHIPSTOCK (07/01/19} 12496' PERFORATION SUMMARY REF LOG: ON r / ANGLE AT TOP PERE " @ ' Note: Refer to Production DB for historical Derf data F-48 A 113000-144251 SLTD F-48AL1 1 112830-136701 SLID I I 1 PB -M -L_13093- 7- 13093'7" LNR, 26#, 13CR-80, .0383 bpf, ID = 6276" 13175' 12195' -1 9-5/8" X 7" TIW LNR HGR, ID = ? I 12200° 3.70" DEPLOY SLV, D = 3.00" 12223' 4-1/2" PARKER SWS NIP, ID = 3.813- 12M' I-� 4-1 /2" PARKER SWN NP MILLED TO 3.80" 12257' 14-1 /2" WLEG, ID = 3.958" I 12r 257' ELMD TT LOGGED 09/27/91 MILLOUT WINDOW 12550' 3-3/16" X 2-7/8" XO, D= 2-377" 12830' 2-7/8" LNR, #, L-80 STL, -_ bpf, D = _" 12830' -13670- L1-01 - 2-7/8" SLTD LNR 13670- - 13820' 4-1/a" OPEN HOLE ........................ .----...... ,.Li \ .............................. --- ............................. I .................... �- 14424' -15074' 4-1/4" OPEN HOLE ........................................ A 13000' 1--12-7/8" LNR, #, L-80 STL, bpf, D=_" DATE REV BY CO SIEWS DATE REV BY COMMENTS 08/04!91 N18E ORIGINAL COMPLETION 10122!07 N4ES RWO _J_J_ CTD MULTI -LAT 06110/19 MD BUILT PROPOSED 07/15/19 JNUJMD CORRECTIONS TO PROPOSED PRUDHOE BAY UNIT WELL: F -48A & AL1 PERMIT No: 1910860, -219-068, '219-069 AR No: 50-029-22187-00 (01) (62) SEC 2, T11 N, RI 3F- 3362' FSL & 2863' FEL BP Exploration (Alaska) Well Bighole Quick Test Sub to Otis Top of 7" Otis Distances from top of riser Excluding quickest sub Top of Annular CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 Top of Annular Element 8.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2-3/8" Pipe/Slips 10.1 ft Kill Line "Iwo r CL 2-318" x 3-112" VBRs CL 2-3/8" Pipe/Slips CL of Top Swab CL of Flow Cross CL of Master LDS LDS Ground Level I ----I 12.8 ftIb 13.4 ft10 CDR2 Rig's Drip Pan t 7-1116" fik Flange X 7` oae Boa �- Swab f T1 T2 Choke Line Test Pump Nose 1 Davies, Stephen F (CED) From:Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent:Tuesday, July 16, 2019 9:48 AM To:Boyer, David L (CED) Cc:Davies, Stephen F (CED); Rixse, Melvin G (CED) Subject:RE: Change in Scope fpr F-48 Lateral Thanks Dave! I’ve cascaded the decision internally to (hopefully) eliminate any possible confusion during the drilling / reporting. Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 | Office: (907) 564-4091 --------------------------------------------------------------------------------------------------- BP Exploration Alaska | 900 E. Benson Blvd. | Room: 717B | Anchorage, AK --------------------------------------------------------------------------------------------------- From: Boyer, David L (CED) <david.boyer2@alaska.gov> Sent: Tuesday, July 16, 2019 9:44 AM To: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Cc: Davies, Stephen F (CED) <steve.davies@alaska.gov>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Subject: Change in Scope fpr F‐48 Lateral Joe, Steve, Mel, and I discussed the naming for the new F‐48 PTD’s submitted yesterday. We agree on the well names: F‐48A (50‐029‐22187‐01‐00) and F‐48AL1 (5‐029‐22187‐62‐00) submitted by BP. Everyone is in consensus that reusing the ‐60 and ‐61 from the previous laterals will only cause confusion in the future for BP and AOGCC. Thank you for calling our attention to this issue. Dave B. 1 Davies, Stephen F (CED) From:Boyer, David L (CED) Sent:Tuesday, July 16, 2019 9:44 AM To:Lastufka, Joseph N Cc:Davies, Stephen F (CED); Rixse, Melvin G (CED) Subject:Change in Scope fpr F-48 Lateral Joe, Steve, Mel, and I discussed the naming for the new F‐48 PTD’s submitted yesterday. We agree on the well names: F‐48A (50‐029‐22187‐01‐00) and F‐48AL1 (5‐029‐22187‐62‐00) submitted by BP. Everyone is in consensus that reusing the ‐60 and ‐61 from the previous laterals will only cause confusion in the future for BP and AOGCC. Thank you for calling our attention to this issue. Dave B. 1 Davies, Stephen F (CED) From:Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent:Monday, July 15, 2019 3:18 PM To:Davies, Stephen F (CED); Boyer, David L (CED); Rixse, Melvin G (CED) Subject:F-48A / AL1 Directional Surveys Attachments:F-48A WP04_.txt; F-48AL1 WP04_.txt Steve / David / Mel, These revised PTD’s will be delivered shortly. These are renamed previously approved PTD’s (F‐48L1 is now F‐48A #219‐ 068 and F‐48L1‐01 is now F‐48AL1 #219‐069). Please let me know if anyone has questions. We plan to spud F‐48A sometime later this afternoon / evening. Thank you for all of your help! Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 | Office: (907) 564-4091 --------------------------------------------------------------------------------------------------- BP Exploration Alaska | 900 E. Benson Blvd. | Room: 717B | Anchorage, AK --------------------------------------------------------------------------------------------------- 1 Davies, Stephen F (CED) From:Rixse, Melvin G (CED) Sent:Monday, July 15, 2019 8:02 AM To:Ciolkosz, Ryan R Cc:Davies, Stephen F (CED); Lastufka, Joseph N Subject:RE: PTD# 191-086; F-48 Wellbore Abandonment Ryan, AOGCC is good with this. We look forward to your paperwork today. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907‐793‐1231 Office 907‐223‐3605 Cell CONFIDENTIALITY NOTICE: This e‐mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e‐mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907‐793‐1231 ) or (Melvin.Rixse@alaska.gov). cc. Steve Davies From: Ciolkosz, Ryan R <Ryan.Ciolkosz@bp.com> Sent: Sunday, July 14, 2019 2:39 PM To: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Subject: PTD# 191‐086; F‐48 Wellbore Abandonment Mel, Due to issues while drilling, we would like to sidetrack the current well at the parent wellbore by setting a new whipstock. The new whipstock will be set at 12475’, which is 20’ above the previous whipstock. The new whipstock will be cemented in the hole by means of down squeezing 10‐15 bbls of Class G cement. This is to prevent the whipstock from dislodging from the casing. The cement will be squeezed into the Sag perforations, which are the only remaining perforations in the parent F‐48 wellbore. Therefore, the new lateral names will change from F‐48 L1 and F‐48 L1‐01 to F‐ 48A and F‐48A L1. If you are good with this, we will update the paperwork and send it to you tomorrow. Thank you, Ryan Ciolkosz 907‐244‐4357 TRANSMITTAL LETTER CHECKLIST WELL NAME: N3 iL E — 4—S A PTD: 113,19— 100 ✓Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: ?V'U A Q -e. bav POOL: 1 (/ (,C G� d P 9 Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of J well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#:2191000 Company BP ExplorationJAlaska.)_Inc. Initial Class/Type _Well Name: PRUDHOE._BAY _UNIT F -48A _Program DEV Well bore seg ❑ DEV / PEND GeoArea 890 _ Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 1 Permit_fee attached_ - - - - - -- NA_ . . 2 Lease number appropriate_ Yes - - - - - - - 3 Unique well -name and number _ - _ - Yes 4 Well located in.a defined pool - - - - - - - - - - - - - - - - Yes 5 Well located proper distance from drilling unit -boundary Yes 6 Well located proper distance from other wells- - I - - - - Yes 7 Sufficient acreage available in.drilling unit - - .. - _ _ _ - Yes _ 8 If -deviated, is wellbore plat included - . - - - - Yes - - - Directional plat & wellbore profile included._ . 9 Operator only affected party Yes - 10 Operator has -appropriate_ bond in force - - - - - - Yes 11 Permit can be issued without conservation order Yes Appr Date 112 Permit can be issued without administrativ_e_approval Yes 13 Can permit be approved before 15 -day wait- - - - - - - . Yes . . DLB 7/16/2019 14 Well located within area and strata authorized by Injection Order # (put_ 10# in -comments) (For NA . _ . 15 All wells within.1/4_mile_area_of review identified (For service well only)- - - - - - - NA_ - - - - - 16 Pre -produced injector: duration of preproduction less than_3 months _(For service well only) NA_ - - - - - - - - 17 __Nonconven, gas conforms to AS31.05.030(j.1_.A),0.2.A-D) _ _ _ ------------------ NA - - - - - - - - - - - - - - - - - - - - - - 18 Conductor string provided . NA_ - - - - - CTD sidetrack, all drilling below production_ tubing. All drilling in the reservoir_. Engineering 19 Surface casing_ protects all known_ USDWs NA CTD sidetrack_, all drilling below production_ tubing. All drilling.in the reservoir. _ - - - 20 CMT vol_ adequate to circulate on conductor_ & surf _csg NA_ CTD sidetrack, all drilling below production -tubing. All drilling.in the reservoir. - - - - - - 21 CMT vol adequate to tie-in long string to surf csg_ NA - - - - - - CTD sidetr_ack_, all drilling below production_ tubing. All drilling in the reservoir. 22 CMT will cover all known_ productive horizons_ - - - - - - - - - NA - - - Slotted -liner -with blank_ near window. All drilling and window in the reservoir 23 Casing designs adequate for C, -T_, B_&_ permafr_ost_ Yes Drilling from existing wellbore, in the reservoir only. Drilling through cemente_d_pe fs from parent well 24 Adequate tankage or reserve pit - Yes Drilled from CDR2._Ongoing operations. Good truck support in.PBU. 25 If_a_re-drill, has a 1.0-403 for abandonment been approved Yes Drilling through cemented -perforations from existing parent wellbore.. Parent abandoned with squeezed cement 26 Adequate wellbore separation -proposed - - - - - - Yes Planned wellpath_passes all BP se pa ratio n_ criteria - - 27 If diverter required, does it meet_ regulations_ - - - - - NA_ - - - AII_ drilling in the_ reservoir from existing parent Appr Date 28 Drilling fluid_ program schematic -&- equip list_adequat_e Yes - - - - - - All fluids will -be overbalanced_ to reservoir MGR 7/17/2019 29 BO_PEs,_do they meet regulation - - - - - - - - - Yes . - 5K BOPE, Standard CTD configuration_ - . 30 _BOPEpress rating appropriate; test to -(put psig in comments). Yes BOPE will be tested to -3-500 psi 31 Choke_manifold complies w/API_RP-53 (May 84)_ - - - - Yes 32 Work will occur without operation shutdown_ Yes CDR2 is in c_ontinuous_ongoin operations_ '33 Is presence_ of H2S gas_ probable Yes - F pad_ is considered an H2S pad._ BP monitoring equipment will be. in place 34 Mechan cal_conditiong of wells within AOR verified (For -service well only) NA_ - - - .. _ . This is a producer. 35 Permit can be issued w/o hydrogen_ sulfide measures _ _ - - - - . . No. _ - - _ - F -Pad wells are H2S-bearing. H2S measures are required. Geology �36 -Data-presented on potential overpressure zones Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date Seismic analysis of shallow gas _zones _ - - - NA_ DLB 7/16/2019 I37 38 Seabed condition survey -(if off -shore) - - - - - - - - - - - - - - - NA_ - - 39 Contact name/phone for weekly -progress reports_ [exploratory only] NA_ Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date