HomeMy WebLinkAbout219-121DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill 2191210 Well Name/No. PRUDHOE BAY UN POL S-20211-1 Operator BP Exploration (Alaska) Inc.
MD 12777 TVD 5213 Completion Date 11/19/2019 Completion Status 1-0IL Current Status 1-011-
REQUIRED
-OILREQUIRED INFORMATION
Mud Log No V/
Samples No 1/
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES, MWD/GR/RES/DEN/NEU, MWD/GR/RES/DEN/NEU
Well Log Information:
Log/ Electr
API No. 50-029-23647-60-00
UIC No
Directional Survey Yes
(from Master Well Data/Logs)
Data
Digital
Dataset
Log Log Run Interval OH /
Type
Med/Frmt
Number Name
Scale Media No Start Stop CH Received
Comments
ED
C
32007 Digital Data
94 12777 2/3/2020
-
Electronic Data Set, Filename: S-
202L1 _BH _LT K_MEM—Composite—Drilling
2021 -1
Depth Data.las
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK-
IMAGE_5MD_Memory Drilling Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK_2MD_Memory
Drilling Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-
2021-1_BH_LTK_2TVDSS_Memory Drilling
Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK_5MD_Memory
Drilling Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-
2021-1_BH_LTK_5TVDSS_Memory Drilling
Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S -202L1 BH_LTK-VSS_RLT-
MEM_Composite Drilling Dynamics Log.cgm
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-
2021-1_ BH_LTK_MEM_Composite_Drilling
Depth Data.dls
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK-
IMAGE_5MD_Memory Drilling Log.pdf
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK_2MD_Memory
Drilling Log.pdf
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-
2021-1_ BH_ LTK_2TVDSS_Memory Drilling
Log.pdf
AOGCC
Page 1 of 3
Tuesday, February 25, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill
2191210 Well Name/No. PRUDHOE BAY UN POL S -202L1 Operator BP Exploration (Alaska) Inc. API No. 50-029-23647-60-00
MD
12777
TVD 5213 Completion Date 11/19/2019
Completion Status 1 -OIL Current Status 1 -OIL UIC No
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_LTK_5MD_Memory
Drilling Log.pdf
ED
C
32007 Digital Data
2/3/2020
Electronic File: S -
202L1 BH_LTK_5TVDSS_Memory Drilling
Log.pdf
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_Final Survey
Report.csv
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-202L1_BH_Final Survey
Report.pdf
ED
C
32007 Digital Data
2/3/2020
Electronic File: S-2021-1_13H_Final Survey
Report.txt
Log
32007 Log Header Scans
0 0
2191210 PRUDHOE BAY UN POL S-2021-1
LOG HEADERS
Well Cores/Samples
Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report 'V
Production Test Information Y /8
Geologic Markers/Tops DY
COMPLIANCE HISTORY
Completion Date: 11/19/2019
Release Date: 9/17/2019
Description
Comments:
Directional / Inclination Data O Mud Logs, Image Files, Digital Data Y /l./ Core Chips Y /lRj
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files l� Core Photographs Y/6
Daily Operations Summary oY Cuttings Samples Y // Laboratory Analyses Y / to
Date Comments
AOGCC Page 2 of 3 Tuesday, February 25, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill 2191210 Well Name/No. PRUDHOE BAY UN POL S -202L1 Operator BP Exploration (Alaska) Inc.
MD 12777 TVD 5213 Completion Date 11/19/2019 Completion Status 1-0I1- Current Status 1-011-
Compliance
-OILCompliance Reviewed By: -
API No. 50-029-23647-60-00
UIC No
Date: "l(a T I ort 0.2--0
AOGCC Page 3 of 3 Tuesday, February 25, 2020
Baker Hughes PRINT DISTRIBUTION LIST
COMPANY BP Exploration Alaska Inc.
VVELL NAME s-202 ; L! ; C2' L 3: L}/
FIELD Prudhoe Bay Unit
COUNTY
BHI DISTRICT
PRUDHOE BAY
Alaska
219121
32007
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd. Anchorage, Alaska 99508 or
GANCPDC@bp365.onmicrosoft.com
Ito acknowledge receipt of this data.
LOG TYPE GR-RES-DEN-NEU
LTK: Density Image Log
AUTHORIZED BY Paul Cani7ares LOG DATE October 30, 2019
EMAIL Paul. Canizarespbakerhughes.com TODAYS DATE January 30, 2020
Revision
STATUS Final Replacement: No Details:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
----------------- ---------------------------- ---- -----
1 iBP North Slope.
EOA, PBOC, PRB-20 (Office 109)
:D&C Wells Project Aides
::Attn: Benda Glassmaker & Peggy O'Neil
'900 E. Benson Blvd.
:Anchorage, Alaska 99508
:.------- ------------------- --------------- ------------------------
Rev. Requested by: ---
FIELD /
FINAL
CD/DVD
FINAL
PRELIM
LOGS
las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
AUFtKiNib
OF COPIES
# OF COPIES
# OF COPIES
--------- 4 J� L 4 4 4
0 0 0 0 0
2 :ConocoPhillips Alaska Inc. 0 0 1 Q 0
Attn: Ricky Elgarico
ATO 3-344
700 G Streetf1�
!Anchorage, AK 99510
-- -- - --- ----- ------ tJ `
- .._
3 ExxonMobil Upstream Oil & Gas, US Conventional Q 0 0 0
c/o ExxonMobil Upstream Integrated Solutions Company
Attn: Technical Data Center (TDC)
22777 Springwoods village Parkway JV-2019-USONSHOR-288
i N2.2A.332
:Spring, Texas 77389
--------...-------------------------
------ - --------- ---- -- -------
----._...........---------------------------- - --- ...- -- - -- - ------------- -- -----
4 State of Alaska - AOGCC 0 0 1 0 0
,Attn: Natural Resources Technitian
:333 W. 7th Ave, Suite 100
:Anchorage, Alaska 99501
- - - ---------- --- ----- ---- ----
5 DNR - Division of Oil & Gas ** 0 0 1 0 0
!Atte: Rersource Evaluation Section
:550 West 7th Avenue, Suite 1100
:Anchorage, Alaska 99501
*** Stam confidential" on all material deliver to DNR
-------------------------- ------------- --------------- --------------------------- -----=
-----------------------------..._......--------------------------------- ... ..-... --
6 BP Exploration (Alaska) Inc. 0 0 0 1 0 0
iPetroteehnical Data Center, LR2-1
900 E. Benson Blvd.
:Anchorage, Alaska 99508
Attn: Nancy Landi
TOTALS FOR THIS PAGE: 0 0 4 0 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL )MPLETION OR RECOMPLETION REPC AND LOG
1a. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
Development 0 Exploratory ❑
GINJ ElWINJ ElWAG ❑ WDSPL ❑ No. of Completions: One
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Aband.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
11/19/2019
219-121 '
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
10/11/2019
50-029-23647-60-00
4a. Location of Well (Governmental Section):
8. Date TO Reached:
16. Well Name and Number:
10/23/2019
PBU S-2021-1
9 Ref Elevations KB 84 80
17. Field/Pool(s):
Surface: 3060' FSL, 4567' fEL, Sec. 35, T12N, R12E, UM
Top of Productive Interval: 3097' FSL, 5211' FEL, Sec. 35, T12N, R12E, UM
GL 37.90 ` BF 39.65
PRUDHOE BAY, POLARIS OIL '
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 3870' FSL, 1696' FEL, Sec. 27, T12N, R12E, UM
12777'/ 5213'
ADI 098257 R 098958
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 618885 • y- 5979263 Zone - ASP 4
12777'/5213'
83-47
TPI: x- 618240 y- 5979289 Zone - ASP 4
12. SSSV Depth (MD/TVD):
20 Thickness of Permafrost MDrrVD:
Total Depth: x- 616372 y- 5985314 Zone - ASP 4
None
1953'/ 1910'
5. Directional or Inclination Survey: Yes p (attached) No ❑
13. Water Depth, if Offshore:
21. Re-drill/Lateral TopWindow
M nrrvn
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
7480'/ 5131'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, MWD /GR/RES / DEN /NEU,MWD /GR/RES / DEN /NEU
23. CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM
TOP
BOTTOM
20"
129.45#
x-65
47' 162'
47'
162'
42"xDriven
13 yds Concrete
10-3/4"
45.5#
L-80
46' 3128'
46'
2902'
13-1/2"
1587 sx LiteCrete, 272 sx Class'G'
7-5/8"
29.7#
L-80
45' 6759'
45'
5287'
9-7/8"
692 sx Class 'G'
4-1/2"
12.6#
L-80
6060' 12777'
5169'
5213'
6-3/4"
Uncemented Slotted Liner
24. Open to production or injection? Yes Q No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom, Perforation
GRADE DEPTH SET (MD) PACKER SET (MD/TV
Size and Number, Date Perfd):
4-1/2" 12.6# L-80 5752' 5637'/5002'
4-1/2" Slotted Liner 10/16/2019
7480'- 12777' 5168'- 5213'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion?
Yes ❑ No ❑
Per 20 AAC 25.283 (i)(2) attach electronic and printed
DATE DEC 18 2019
�<-I_clzs AOGCC
information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production: December 3, 2019
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date of Test:
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Size
Gas -Oil Ratio:
Test Period �►
Flow Tubing
Press
Casing Press:
Calculated
24 Hour Rate
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravity - API (corr):
Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
X //a RB®MS DEC 2 3 2019
28. CORE DATA Conventional Core(s) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 '
If Yes to either question, list formations and interv— cored (MD+TVD of top and bottom of each), and summariz, ... iology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
6035'
5160'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Schrader Bluff OBa
6035'
5160'
Schrader Bluff OBb
6124'
5190'
Schrader Bluff OBc
6300'
5237'
Schrader Bluff OBd
6395'
5256'
Kicked off from Parent Well
7480'
5168'
Schrader Bluff OBc (Invert)
7495'
5166'
Schrader Bluff OBb
7685'
5131'
Schrader Bluff OBa (Fault)
11340'
5098'
Formation at total depth:
Schrader Bluff OBa
11340'
5098'
31. List of Attachments: Summary of Daily Drilling Reports, Survey, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Gorham, Bradley M
Authorized Title: S pecialis Contact Email: Bradley.Gorham@bp.com
nn QQ
Authorized Signature: Date:.jr� 1��"1 Contact Phone: 907-564-4649
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29,
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071,
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
TRFF =
WELLHEAD =
ACTUATOR=
KB. ELEV =
BF. ELEV =
KOP =
Max Angle = 98' 0 6848'
Dahm MD = 5831'
Datun TVD = X000
�n• rnNn —
S -2O2 FSAFET'" NOTES: WELL ANGLE > 70" 4y 5980'. MAX
DLS: k 0 6848'. "'CHROME TBG"'"
(L1, L2, L3, & L4)
10-3/4' CSG, 45.5#, L-80 VAM 21/BTC, 3128'
D = 9.950' �=
7-yff' 6-6-r Tom l9 y�rA
Minimum ID: 3.813" @ 2008'
4-1/2" HES X NIPPLE
4-1/2- TBG, 12.6#, 13CR-85 VAM TOP, --1 5752'
.0152 bof. ID = 3.958'
BAKER HOOK HANGER ASSY
w/ L2 SEALING LEM, ID = 3.688'
4-12- RA TAG 1-1 5894'
LEM #2 LOWER SEAL ASSY, D = 3.870- 5935'
BAKER HOOK HANGER ASSY 6001'
w/ L1 SEALING LEM, ID = 3.688'
2' RA TAG 1--� 6066'
LEM #1 LOWER SEAL ASSY, ID = 3.688' 6108'
7-5/8' CSG, 29.7#, L-80 VT HC, ID = 6.875- 6759'
I I
L2- 5,
7296 '/ l I
'0'AJ4.' E-6 G / I I
G- /io t1-- /�e - )''P �S-20i
b.i1c f. (OBd3
4-12' SLTD LNR, 12.6#, L-80,-
.0152 bpf, ID = 3.958'
2008' 1-14-12' HES X NP, D = 3.813'
GAS LIFT MANDRELS
ST MD I TVD I DEV I TYPE I VLV I LATCH I PORT I DATE
3 3491 13245 1 14KBG-2 DOME BK 1 16 12/02/19
2 4480 4192 27 KBG-2 DOME BK 16 12/02/19
1 5463 4914 57 KBG-2 SO BK 24 12/02/19
5539' 4-12' HES SLIDING SLEEVE, ID = 3.813'
5567' DOWNHOLE GAUGE
5637' 75/8' X 4-12' HES TNT PKR, ID = 3.856'
5669' 4-12' HES X NIP, ID = 3.813-
6736' HES X NIP, D = 3.813-
5743' --{7SB" X 5 12' BKR ZXP LTP w/ HGR BTIEBK, ID = 6.530'
5752' 4-12' WLEG, ID = 3.958'
5763' 19' SEAL BORE EXTENSION, ID = 4.75'
— 5783' —J512'X412'XO.ID=3.950'
4-12' S LTD LNR, 12.6#, L-80 DWC, .0152 bpf, ID = 3.958 11461'
` - - - - - - - - - - - - - - - - - - - - -LS (OA) LEM WINDOW 67'
L4(OA)--------------5849'-5662'
OPENING WIDTH = 3.33"
5902' 758' X 5-12' BKR Z)(P LTP w/ HGR BTIEBK, D = 6.530'
5921' 19-12' SEAL BORE EXTENSION, D = 4.75'
�- 5941' 5-12` X4-12' XO, ID = 3.950'
4-12' SLTD LNR, 12.6#, L-00 DWC, .0152 bpf, ID = 3.958 12961'
- - - - - - - - - - - - - - - - - - - - L4 (OBa) LEM WINDOW 69'
L3 (OBa) _ _ 6007'-6020
\ OPENING WIDTH = 3.33"
6060' 75/8' X 5-12' BKR ZXP LTP w/ HGR BTIEBK, ID = 4.810'
6093' 1-� 19 SEAL BORE EXTENSION, ID = 4.75-
W - 6112' J- 5-12' X 4-12' XO. ID = 3.970'
14-12' SLTD LNR 12.6#�L-00 DWC�.0152 bpf, ID = 3.958 I 12777'
L1 (OB_ _ _b)
_ __
7480' 6' FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
4-12' SLTD LNR,12.6#, L -B0 DWC, .0152 bpf, ID = 3.958 13184'
- - - - - - - - - - - - - - - - - - - - - -,
L2_(OBc)-----------
6876' 6' FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
DATE
I REV BY
COMMENTSDATE REV BY COMMENTS
11M7M9
P-272
ORIGINAL COMPLETION
12/03/1 9
JMD
DRLG HO CORRECTIONS
12104/19
BG/JMD
FINAL ODE APPROVAL
12112/19
TS/JMD
GLV C/O (12/02/19)
12117/19
JNUJMD
ADDED REF, BF ELEV & COND INFO
POLARIS UNIT
WELL: S-202, L1, L2, L3, 8 L4
PERMIT No: 219-120, (121), (122), (123), (124)
API No: 50-029-23647-00, (60), (61), (62), (63)
SEC 35. T12N. R12E. 3060' FSL & 456T FEL
BP Exploration (Alaska)
Printed 12/17/2019 11.21.21AM *'All depths reported in Drillers Depths"
North America - ALASKA - BP Page 1 of 55
Operation Summary Report
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task
Code NPT Total Depth
Phase Description of Operations
— L _ (hr)
- — (usft) -
9/22/2019 21:00 00:00 3.00
RIGID
P
PRE GENERAL RIG DOWN OPERATIONS
RIG DOWN RIG FLOOR
SKID FLOOR
LAY OVER DERRICK (375K MAX)
J- _RIG DOWN INTERCONNECTS
9/23/2019 00:00 03:00 3.00
MOB
P
PRE SEPARATE MODULES AND PREPARE TO
MOVE TO S -PAD
03:00 07:30 4.50
MOB
P 1
PRE MOVE ALL THREE MODULES TO OXBOW
ROAD -5 MILES
OBSERVE SIGNIFICANT CRACKING IN THE
ROAD BEHIND LEAD MODULE (MUD MOD)
NEAR THE LANDFILL
DISCUSS PLAN FORWARD WITH RIG MOVE
COORDINATOR AND FIELD ENGINEER,
DECISION MADE TO LAY ADDITIONAL MATS
AROUND THE LANDFILLAREA, AFTER MATS
ARE IN PLACE MOVE MUD MOD TO DS07 AND
ASSESS THE ROAD TO DETERMINE IF MORE
07:30 22:00 14.50
MOB
P
MATS WILL NEED TO BE PLACED
PRE STAGE RIG MODULES AND WAIT FOR
---
ADDITIONAL MATS TO BE LAYED IN FRONT
OF RIG
22:00 23:00 1.00
MOB
----
P
- - -
PRE MOVE DRILL MOD AND UTILITY MOD UP TO
23:00 00:00 1.00
MOB
P
MUD MOD AT THE LANDFILL
PRE LAYADDITIONAL MATS IN FRONT OF MUD
MOD
9/24/2019 00:00 00:30 0.50
MOB
P
PRE LAY ADDITIONAL MATS IN FRONT OF MUD
-- -
-. -
MOD
00:30 02:30 2.00
MOB
P
PRE MOVE MUD MOD TO DS07 AND INSPECT
ROAD
OBSERVE MINOR CRACKING IN THE ROAD
FROM MUD MOD IN 2 AREAS BETWEEN THE
LANDFILL AND DS07
DECISION MADE TO CONTINUE TO DS07
WITH DRILL MOD AND UTILITY MOD
02:30 - 05:00 2.50
MOB
P
PRE MOVE DRILL MOD AND UTILITY MOD TO DS07
WITH THE MUD MOD AND CONTINUE WITH
THE RIG MOVE TO FLOW 3
OBSERVE SIGNIFICANT CRACKING AND
UPHEAVING OF ROAD
05:00 12:00 7.00
MOB
P
PRE FIX ROAD AND LAY ADDITIONAL MATS
12:00 16:00 4.00
MOB
-
P
-
PRE MOVE RIG TO BOC
- ROAD BUCKLED UNDER DRILL MOD
16:00 - 20:00 4.00 ?
MOB
�P
LEAVING SIGNIFICANT HOLE IN THE ROAD,
DRILL MOD ABLE TO PULL OUT OF HOLE
PRE FIX ROADAND LAYADDITIONAL MATS
POSITION 2 LOADED MAT TRUCKS AND
LOADER BETWEEN MUD MOD AND DRILL
MOD WITH TOOL SERVICE REP TO INSPECT
ROAD FOR POTENTIAL INTEGRITY ISSUES
AFTER THE MUD MOD PASSES
Printed 12/17/2019 11.21.21AM *'All depths reported in Drillers Depths"
North America - ALASKA - BP Page 2 of 55
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881-00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
20:00 22:00 2.00 MOB P PRE MOVE RIG TO COLD STORAGE PAD
ROAD BUCKLED UNDER THE DRILL MOD IN
FRONT OF COLD STORAGE PAD, DRILL MOD
UNABLE TO PULL OUT OF DEPRESSION IN
ROAD
MUD MOD ABLE TO REACH PRICE PAD
DEVELOP PLAN FORWARD, DECISION MADE
TO LAY MATS IN FRONT OF DRILL MOD,
PLACE SAND BAGS AND TIMBERS AS
NECESSARY TO RECOVER DRILL MOD AND
DRIVE ONTO RIG MATS. FIX THE ROAD AND
_ LAY RIG MATS TO PRICE PAD_
22:00 00:00 2.00 MOB P PRE RECOVER DRILL MOD FROM DEPRESSION IN
ROAD
9/25/2019 00:00 13:30 I 13.50 MOB P PRE RECOVER DRILL MODULE
SHIM AND CRIB DRILL MODULE WITH
LUMBER AND SAND BAGS
ATTEMPT TO PULL DRILL MODULE OUT WITH
2 CAT D8 DOZERS: UNABLE TO PULL DRILL
MODULE OUT
MOBILIZE 2 ADDITIONAL CAT D8 DOZERS
PULL DRILL MODULE OUT OF THE HOLE IN
ROAD WITH 4 CAT D8 DOZERS
GET DRILL MODULE UP ON RIG MATS
13:30 16:30 3.00 MOB P PRE REMOVE LUMBER AND SAND BAGS FROM
ROAD AND PREP ROAD FOR REPAIR.
MOVE DRILL MODULE ON RIG MATS, AND
STAGE AT PRICE PAD
16:30 22:30 6.00 MOB P PRE ROADS AND PADS WORKING TO REPAIR
DAMAGED SECTION OF ROAD BETWEEN
DRILL MODULE AND UTILITY MODULE
2230 2300 0.50 MOB P PRE LAY RIG MATS OVER REPAIRED SECTION OF
ROAD UP TO UTILITY MODULE
23:00 23:30 0.50 MOB P PRE MOVE UTILITY MODULE FORWARD TO COLD
STORAGE PAD AND STAGE SO THAT TRAFFIC
_ CAN GET AROUND.
23:30 00:00 0.50 MOB P PRE WAIT ON MATS TO BE PLACED FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD
9/26/2019 0000 17:30 17.50 MOB P PRE WAIT ON MATS TO BE PLACED FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD
17:30 22:00 4.50 MOB P PRE MOVE MUD MODULE FROM PRICE PAD TO
N -PAD ACCESS ROAD
INSPECT ROAD: NO ISSUES NOTED
2200 23:30 1.50 MOB P PRE TROUBLESHOOT MUD MODULE MOVING
SYSTEM HYDRAULICS
2330 00:00 0.50MOB P PRE RESUME MOVING MUD MODULE TO
PLANNED STAGING AREAAT M -PAD ACCESS
_ _ _ ROAD
9/27/2019 0000 04:00 4.00 MOB P PRE MOVE DRILL MODULE AND UTILITY MODULE
FROM PRICE PAD TO PLANNED STAGING
AREA AT CC2A
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America -ALASKA - BP Page 3 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S - - -
-
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOL
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code 1 NPT Total Depth Phase
Description of Operations
(hr)—
-- (usft)
04:00 - 00:00 20.00
MOB P PRE
WAIT ON MATS TO BE PICKED UP FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD AND MOVED AHEAD TO BETWEEN
THE EASTAND CENTRAL CHANNELS OF THE
9/28/2019 00:00 - 14:00 14.00
14.00 - 2000 6.00
2000 - 23 00 3.00
MOB
MOB
KUPARUK RIVER.
SIMOPS:
- CLEAN RIG AND PERFORM PM
THROUGHOUT ALL 3MODULES
P PRE WAIT ON MATS TO BE PICKED UP FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD AND MOVED AHEAD TO BETWEEN
THE EAST AND CENTRAL CHANNELS OF THE
KUPARUK RIVER.
SIMOPS:
- CLEAN RIG AND PERFORM PM
- THROUGHOUT_ALL MODULES
P PRE MOVE MUD MODULE FROM M -PAD ACCESS
ROAD ACROSS THE KUPARUK RIVER AND ON
TO S -PAD ACCESS ROAD.
SOFT ROAD CONDITIONS IN SEVERAL
SPOTS ON THE SPINE ROAD ON THE WEST
SIDE OF THE KUPARUK RIVER, BUCKLED
SEVERAL RIG MATS
WILL REQUIRE DOUBLE MATTING IN
SEVERALAREAS PRIOR TO MOVING DRILL
MODULE ACROSS.
MOVE DRILL MODULE FROM CC2ATO M -PAD
AND STAGE THERE
MOB P PRE MOVE MUD MODULE ALONG S -PAD ACCESS
23:00 - 0000 1.00 MOB
9/29/2019 00 00 - 01 00 1 00 MOB
01 00 - 04.30 3.50
04 30 - 1530 11 00
1530 - 1900 3.50
1900 - 22.00 3.00
ROAD TO S -PAD AND ASSESS ROAD PRIOR
TO MOVING REMAINING MODULES
SOFT ROAD CONDITIONS ALLALONG S -PAD
ACCESS ROAD
- ACCESS ROAD WILL REQUIRE MATTING
PRIOR TO MOVING REMAINING MODULES
P PRE MOVE MATS AND CREATE A STAGING AREA
ON WEST SIDE OF KUPARUK RIVER BRIDGE
FOR DRILL MODULE AND UTILITY MODULE
THAT WILL ALLOW TRAFFIC TO PASS.
P PRE MOVE MATS AND CREATE A STAGING AREA
ON WEST SIDE OF KUPARUK RIVER BRIDGE
FOR DRILL MODULE AND UTILITY MODULE
THAT WILL ALLOW TRAFFIC TO PASS.
PRE MOVE DRILL MODULE FROM M -PAD TO
STAGING AREA ON WEST SIDE OF KUPARUK
RIVER
MOVE UTILTIY MODULE FROM CC2ATO
STAGING AREA ON WEST SIDE OF KUPARUK
RIVER_
PRE MOVE MATS FROM KUPARUK RIVER
CROSSINGS AHEAD OF RIG TO S -PAD
ACCESS ROAD. -
PRE MOVE DRILL MODULE AND UTILITY MODULE
FROM STAGING AREA ON WEST SIDE OF
KUPARUK RIVER TO S-PADACCESS ROAD
PRE MOVE DRILL MODULE AND UTILITY MODULE
ALONG S -PAD ACCESS ROAD TO S -PAD.
"All depths reported in Drillers Depths'"
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths**
North America
- ALASKA - BP
Page 4 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 .00 )
Project: PBU
Site: S
- - -- -
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
!i
Task
Code NPT
Depth Phase
Tot(u)
Description of Operations
( )
—
22:00 - 00:00
2.00
MOB
P
PRE
LOAD WELL HEAD EQUIPMENTAND
DIVERTER LINE INTO BOP DECK PRIOR TO
SPOTTING DRILL MODULE OVER WELL
9/30/2019 100:00 01:30
1.50
MOB
P
PRE
CONTINUE TO LOAD WELL HEAD EQUIPMENT
AND DIVERTER LINE INTO BOP DECK PRIOR
TO SPOTTING DRILL MODULE OVER WELL
01:30 - 03:00
1-50
MOB
P
PRE
SPOT DRILL MODULE OVER CONDUCTOR.
MOVE UTILITY MODULE AND MUD MODULE
INTO POSITION.
03 00 05.30
2.50
MOB
P
PRE
GENERAL RIG UP OPERATIONS
MAKE UP ELECTRICAL CONNECTIONS
BETWEEN MODULES.
MAKE UP LINES IN INTERCONNECTS
RAISE MASTAND SKID RIG FLOOR TO DRILL
POSITION
MAX WEIGHT OFF HEADACHE RACK = 505
KLBS
ACCEPT RIG AT 05:30
05 30 11:00
5.50
MOB
P
PRE
CONTINUE TO RIG UP
- BEGIN OFF LOADING 8.6 PPG MAXDRIL-N TO
PITS
BRIDLE DOWN AND SECURE LINES IN
DERRICK
CALIBRATE BLOCKS
NIPPLE UP DIVERTER SYSTEM
11 00 13:00
2.00
MOB
P
PRE
HOLD PRE -SPUD AND RIG EVACUATION
DRILLS WITH BOTH CREWS
SIMULATE ACTIVATING THE ESD AND
SHUTTING DOWN THE BACK UP POWER
SYSTEMS PRIOR TO EVACUATING THE RIG
13:00 18:00
5.00
MOB
+ P
PRE
CONTINUE TO RIG UP
I
j
NIPPLE UP DIVERTER AND KNIFE VALVE ON
RISERS
NIPPLE UP LOW PRESSURE RISERS AND
FLOW BOX
INSTALL FLOW LINE AND HOLE FILL LINES
INSTALL 4" VALVES ON CONDUCTOR
CALIBRATE PITS WITH QUADCO REP
BUILD STANDS OF 5" DRILL PIPE WITH
OFF-LINE STAND BUILDING EQUIPMENT
- TEST GAS ALARMS
18:00 19:00
1.00
MOB
P
PRE
PERFORM DIVERTER FUNCTION TEST AND
KOOMY TEST
KNIFE VALVE OPENED AT 20 SEC, ANNULAR
CLOSED AT 42 SEC.
AOGCC REPRESENTATIVE BRIAN BIXBY
WAIVED WITNESS AT 06.35 ON 09/30/2019
1
19:00 20:00
1.00
MOB
P
PRE
LINE UP AND PRESSURE TEST MUD LINES TO
_
_ 3500 PSI
20:00 21:30
1.50
MOB
P
PRE
PICK UP AND MAKE UP PARTIAL BHA#1,
13-1/2" DRILLING ASSEMBLY WITH 1.8° AKO
MOTOR PER BAKER DD
-VERIFY AKO ON MOTOR
- MAKE UP 13-1/2" BAKER VMD -3 BIT, MOTOR,
STABILIZER AND XO TO NC50
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 5 of 55
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00 OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
21:30 - 23:00 1.50 MOB P 162.00 PRE CLEAN OUT TO BASE OF CONDUCTOR AT 162'
23:00 - 00:00 1.00 DRILL P
10/1/2019 0000 - 04:30 4.50 DRILL P
0430 - 05:00 0.50 DRILL P
05 00 - 12:00 7.00 DRILL P
MD
-TAG ICE AND FILL AT 115' MD
400 GPM, 307 PSI ON/OFF BOTTOM
40 RPM, 1 KFT-LBS TORQUE ON/OFF
BOTTOM
7 KLBS WOB
PU 49 KLBS, SO 49 KLBS, ROT 49 KLBS
MUD WEIGHT IN/OUT = 8.6 PPG
200.00 SURF
SPUD WELLAND DRILL TO 200' MD TO MAKE
ROOM FOR MWD/GWD ASSEMBLY
400 GPM, 307 PSI ON/OFF BOTTOM
40 RPM, 1 KFT-LBS TORQUE ON/OFF
BOTTOM
7 KLBS WOB
PU 49 KLBS, SO 49 KLBS, ROT 49 KLBS
MUD WEIGHT IN/OUT = 8.6 PPG
RACK BACK HEAVY WEIGHT DRILL PIPE TO
MAKE UP REMAINDER OF BHA#1.
200.00 SURF
MAKE UP BHA #11, 13-1/2" DRILLING
ASSEMBLY WITH 1.8° AKO MOTOR AND
MWD/GWD TO 155' MD
- SCRIBE TOOL FACE ON MOTOR, ONTRAK
AND GYRODATA GWD
PLUG IN AND VERIFY ONTRAK
MAKE UP AND SCRIBE REMAINDER OF BHA
#1
200.00 SURF
SHALLOW HOLE TEST TOOLS AND TAKE
INITIAL GWD SURVEY AT 1 00'MD SURVEY
DEPTH.
493.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 200' MD
TO 493' MD, 490' TVD.
- 550 GPM, 1080 PSI ON BOTTOM, 980 PSI OFF
BOTTOM
- 50 RPM, 1 KFT-LBS TORQUE ON BOTTOM, 1
KFT-LBS TORQUE OFF BOTTOM, 10 KLBS
WOB
PU 72 KLBS, SO 64 KLBS, ROT 68 KLBS
SURVEY EVERY 90' WITH GWD
MUD WEIGHT IN/OUT = 8.6 PPG
SIGNIFICANT RUNNING PEA GRAVEL
OUTSIDE OF CONDUCTOR AND FILL ON
BOTTOM
- INCREASED MUD RHEOLOGY TO SLIGHTLY
ABOVE TARGET TO HELP CONTROL (PV:
12-18, YP: 90-130)
LOST 728 BBLS WHILE DRILLING FROM 162'
TO 490' MD
- SOME WATER FLOW IN 5-126 CONDUCTOR
NOTED: NOTIFIED PAD OPERATOR
- LOSSES HEALED UP WITH INCREASE IN
MUD RHEOLOGYAND INCREASE IN CLAY IN
CUTTINGS
- WATER FLOW IN S-126 STOPPED AFTER
LOSSES HEALED UP
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
Printed 12/17/2019 11:21:21 AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 6 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
12:00 00:00 12.00
DRILL P
1,570.00 SURF
DRILL 11-1/2" SURFACE HOLE FROM 493' MD
TO 1570' MD, 1557' TVD
550 GPM, 1475 PSI ON BOTTOM, 1390 PSI
OFF BOTTOM
50 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 3
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 104 KLBS, SO 99 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
CONTINUE TO TAKE GYRO SURVEYS WITH
GWDAS REQUIRED
MUD WEIGHT IN/OUT = 8.7/8.8 PPG
MWD SURVEYS CLEANED UP AND 3RD
CONSECUTIVE CLEAN SURVEY MATCHING
GWD WAS AT 1457'
10/2/2019 00 00 07:30 7.50
DRILL P
1,990.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 1570' MD
TO 1990' MD
550 GPM, 1800 PSI ON BOTTOM, 1395 PSI
OFF BOTTOM
- 50 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 3
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 110 KLBS, SO 100 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
MUD WEIGHT IN/OUT = 8.8 PPG
07:30 08 30 1 00
DRILL P
1,990.00 SURF
CIRCULATE 2 X BOTTOMS UP
-600 GPM @ 1750 PSI
-50 RPM @ 3K TORQUE
-RACK BACK STAND EVERY 20 MINUTES
-MONITOR WELL FOR 10 MINUTES, STATIC
08:30 1000 1.50
DRILL P
1,99000 SURF
POOH ON ELEVATORS FROM 1800' TO 216'
-PU WT 83K, SO WT 78K @ 1000'
-MUD WT IN AND OUT 8.9 PPG.
10.00 12:00 2.00
DRILL
P
1,990.00 SURF
RIH WITH 13 1/2" DRILLING BHA FROM 216' TO
1990' MD
-TIGHT SPOT 1655' TO 1690'20K DOWN WT
-WASH LAST STAND TO BOTTOM
12 00 00 00 1200
DRILL P
2,724.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 1990' MD
TO 2724' MD
600 GPM, 2200 PSI ON BOTTOM, 1830 PSI
OFF BOTTOM
50 RPM, 9 KFT-LBS TORQUE ON BOTTOM, 6
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 133 KLBS, SO 99 KLBS, ROT 112 KLBS
SURVEY EVERY 90', SURVEY EVERY 30' FOR
DOGLEGS >5 DEG/ 100'
—
MUD WEIGHT IN/OUT = 8.9 PPG
10/3/2019 0000 07:30 7.50
DRILL P
3,135.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 2724' MD
TO VMD
600 GPM, 200 PSI ON BOTTOM, 1870 PSI OFF
BOTTOM
50 RPM, 7 KFT-LBS TORQUE ON BOTTOM, 5
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 1 KLBS, SO 110 KLBS, ROT 120 KLBS
SURVEY EVERY 90', SURVEY EVERY 30' FOR
DOGLEGS >5 DEG/ 100'
MUD WEIGHT IN/OUT = 9.1 PPG
Printed 12/17/2019 11:21:21 AM
"All depths reported in Drillers Depths"
Printed 12/17/2019 11:21:21AM
**All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 7 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00
OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
07:30 09:30
2.00
DRILL
P
3,135.00
SURF
CBU x 3
-650 GPM, 2100 PSI
-50 RPM, 5K TO
-RACK BACK 1 STD EVERY 30 MIN
-FLOW CHCECK FOR 15 MIN, STATIC
09:30 11:00
1.50
DRILL
P
3,135.00
SURF
POOH ON ELEVATORS 2900-1830
-15K DRAG 2510-2475, WORK THRU ONCE
THEN OK
-TAKE CHECK SHOT SURVEYS X4 TO CHECK
>7 DEG DOG LEGS @ 2272. 2240, 2209, 1736
SURVEY DEPTHS
-MUD WT 9.0 PPG IN AND OUT
11:00 12:00
1.00
DRILL
P
3,135.00
SURF
RIH 1830-3135
-RIH ON ELEVATORS
-OBSERVED DRAG 20-40K @ 2515-2550,
2790-2825;2890-2910
- TAG BTTM NO FILL
12:00 14:00
2.00
DRILL
P
3,135.00
SURF
CBU X 2
-650 GPM, 50 RPM,2050 PSI, 5K TO
-RACK BACK 1 STD EVERY 20 MIN.
14:00 16:30
2.50
DRILL
P
3,135.00
SURF
POOH F/ SURFACE CSG
-MUD WT 9.0 PPG IN AND OUT
-MONITOR WELL FOR 10 MIN,STATIC
16:30 19:00
2.50
DRILL
P
3,135.00
SURF
LAY DOWN SURFACE HOLE BHA
-PJSM
-CLEAN CLAY OFF BHA COMPONENTS
19:00 19:30
0.50
DRILL
P
3,135.00
SURF
CLEAN AND CLEAR RIG FLOOR
19:30 20:30
1.00
CASING
P
3,135.00
SURF
RIG UP TO RUN 10 3./4" CASING
-PJSM
-RIG UP VOLANT CASING RUNNING TOOL
20:30 21:00
0.50
CASING
P
3,135.00
SURF
LUBRICATE RIG
21:00 00:00
3.00
CASING
P
3,135.00
SURF
RUN 10 3/4", 45#, L-80 CASING FROM
SURFACE TO 569'
-MAKE UP SHOE TRACK WITH 2 SPACE OUT
PUPS
-BREAK COLLAR OFF SPACE OUT PUPS AND
BAKER LOK
-CHECK FLOATS, GOOD.
-USE JET LUBE SEAL GAURD ON VAM 21
CONNECTIONS
-TORQUE TURN TO 26,250 FT/LBS
-FILL EVERY JOINT
-CIRCULATE EVERY 10TH JOINT 10 BPM FOR
5 MINUTES
-PU WT 56K, SO WT 56K
-MUD WT 9.0 PPG IN AND OUT
10/4/2019 00:00 08:00
8.00
CASING
P
3,135.00
SURF
RUN 10 3/4", 45#, L-80 CASING 569 TO 3128'
-LANDED ON LANDING RING.
-USE JET LUBE SEAL GAURD ON VAM 21
CONNECTIONS
-TORQUE TURN TO 26,250 FT/LBS
-FILL EVERY JOINT
-CIRCULATE EVERY 10TH JOINT 10 BPM FOR
5 MINUTES
-PU WT 150K, SO WT 105K @ 3128
-MUD WT 9.1 PPG IN AND OUT
Printed 12/17/2019 11:21:21AM
**All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 8 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
- _ (hr) - (usft)
_g_CONDITION
08:00 12:00 4.00 CASING P 3,135.00 SURF
CIR MUD FOR CSG
-CIR AT 10 BPM/ 330 PSI, 29% RETURNS
-RECIPROCATE PIPE 15 FTAT 1000 FPM
-PREP TO CMT, RU SLB CMTRS. REDUCE WT
TO 9.1, 18 YP; 13 PV
-PJSM W/ ALL PERSONNEL
RIG UPAND BLOWAIR TO_ SLB CEMENTERS
12:00 17:00 5.00 CASING P 3,135.00 SURF
CMT 10 3/4 CSG:
-PRESSURE TEST 3500 F/ 5 MIN
-PUMP 104 BBLS 10 PPG MUD PUSH @ 6 BPM;
100 PSI
-UN-STING VOLANT AND LAUNCH BOTTOM
PLUG
-PUMP 540 BBLS (1587 SKS) 11 PPG, LEAD
CMT @ 6 BPM (YIELD 1.91 CU FT/SK)
-PUMP 56.2 BBLS (256 SKS) 15.8 PPG TAIL
CMT @ 6 BPM (YIELD 1.16 CU FT/SK)
'-DROP TOP PLUG
-RECIPROCATED 18' AT SURFACE WHILE
PUMPING CMT AT6 BPM UNTIL MUD PUSH TO
SURFACE
-PERFORM DISPLACEMENT WITH RIG PUMPS
-220 BBLS AT 10 BPM: ICP 560 PSI, 13%
RETURNS, FCP 860 PSI, 13% RETURNS
50 BBLS DISPLACED AT 7 BPM: ICP 650 PSI,
9% RETURNS, FCP 700 PSI, 9% RETURNS
10 BBLS DISPLACED AT 3 BPM: ICP PSI, 10 %
RETURNS, FCP 700 PSI, 10% RETURNS
BUMP PLUG TO 1200 PSI, HOLD FOR 5 MIN,
BLEED OFF & OBSERVE FOR 10 MIN, NO
BACK FLOW.
-BTTM PLUG BURSTAT 400 PSI ABOVE PUMP
PRESSURE AT 280 BBLS LEAD CMT AWAY,
PUMP ADDITIONAL 60 BBLS LEAD THEN
SWITCH TO TAIL.
-OBSERVED GOOD CMTAT SURFACE @ 85
BBLS DISPLACEMENT, CIR OUT 205 BBLS
GOOD CMT.
-TOTAL LOSSES 35 BBLS
CMT WET 13:22
CMT IN PLACE 16:22
CLEAN RIG AND RIG DOWN CEMENT
EQUIPMENT
DRAIN CEMENT RETURNS FROM STACK
SUCK OUT CELLAR
BACK OUT LANDING JOINT AND LAY DOWN
TO PIPE SHED
- DISCONNECT KNIFE VALVE AND FLUSH
DIVERTER ANNULAR AND STACK WITH
BLACK WATER PILL, WORKANNULAR
SEVERALTIMES
- RIG DOWN CASING TOOLS FROM RIG
FLOOR
CLEAN AND CLEAR RIG FLOOR
CLEAN SHAKER DECKAND PITS
Printed 12/17/2019 11:21 21AM "'All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 9 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
-
-
^Site:
-J
Project: PBU
S
Rig Name/No.: PARKER 272
Spud Datelrime: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date
From - To Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
17:00 22:30 5.50
BOPSUR P 3,135.00
SURF
NIPPLE DOWN DIVERTER SYSTEM
NIPPLE DOWN 20' DIVERTER LINE FROM
BACK OF BOP DECK
BREAK BOLTS ON RISER AND DIVERTER
ANNULAR
NIPPLE DOWN KNIFE VALVE AND DIVERTER
ANNULAR
MOBILIZE WELLHEAD TO BOP DECK
NIPPLE DOWN RISER
SIMOPS:
CLEAN PITS
REMOVE SPARE 10-3/4" CASING JOINTS
FROM SHED
REMOVE SURFACE HOLE BHA
COMPONENTS FROM SHED
MOBILIZE INTERMEDIATE BHA
COMPONENTS TO PIPE SHED
22:30 23:00 0.50
BOPSUR P 3,135.00
SURF
LUBRICATE RIG
23:00 00:00 1.00
BOPSUR P
3,135.00
SURF
NIPPLE UP FMC GEN 5 WELLHEAD PER FMC
REPRESENTATIVE
CLEAN AND STEAM SPEED HEAD AND
CASING SPOOL
ORIENT AND INSTALL WELLHEAD
10/5/2019 00 00 0530 5.50
WHSU P 3,135.00
SURF
NIPPLE UP FMC GEN 5 WELLHEAD PER FMC
REPRESENTATIVE
CLEAN AND STEAM SPEED HEAD AND
CASING SPOOL
ORIENT AND INSTALL WELLHEAD
-TQ CSG HEAD X TBG SPOOL FLANGE
-TQ CSG HEAD TO HANGER
-INSTALL OA VALVES & DBL BLOCK IA/OA
VALVES
-TEST VOID TO 1000 PSI
SIMOPS:
NIPPLE UP BOP STACK
NIPPLE UP HIGH PRESSURE RISER AND
SPACER SPOOL
NIPPLE UP BOP STACK
CHANGE UPPER RAMS TO 7 5/8" CASING
RAMS
NIPPLE UP FLOW RISER
ATTACH TURNBUCKLES AND HOLE FILL
LINES
INSTALL MOUSEHOLE
NIPPLE UP CHOKE LINE
05:30 08.30 3.00
BOPSUR P 3,135.00
SURF
TQ HIGH PRESSURE RISER FLANGES, SET
TEST PLUG W/ 7 5/8 TEST JT. PURGE LINES,
FILL STACK, PERFORM SHELL TEST.
08:30 13:30 5.00
BOPSUR P 3,135.00
SURF
PRESSURE TEST BOPE:
-TESTANNULAR 4 & 5" TEST JTS, 3500 HIGH
250 LOW/ 5 MIN EACH
-TEST LOWER RAMS, 4 & 5" TEST JTS, 5K
HIGH/ 250 LOW/ 5 MIN EACH
-TEST CHOKE MANIFOLD, HCR CK AND KILL
LINES, 5K HOW, 250 LOW/ 5 MIN EACH
-TESTED ALARMS, PVTAND FLOW SHOW
-TEST WITNESSED BY JEFF JONES- AOGCC
Printed 12/17/2019 11 21 21A
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 10 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
-
Project: PBU
--
Site: S
- --
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
—
13:30 14:00 !
0.50
WHSUR
P
3,135.00
SURF
-
INSTALL WEAR BUSHING
-PULL TEST PLUG
-INSTALL LONG WEAR BUSHING 10" ID
14:00 17:30
3.50
I CASING
P
3,135.00
SURF
97/8"BHA
-PU & RIHW/ 9 7/8 HYCALOG TKC66 PDC,
AUTO TRACK, ONTRACK, LITHOTRACK.
- MAKE UP FILTER SUB, FLOAT SUB AND FLEX
COLLARS
17:30 19:00
1.50
CASING
P
3,135.00
SURF
RUN IN THE HOLE WITH BHA#2 ON 5" DRILL
PIPE STANDS FROM 908' MD TO 2993' MD
- SHALLOW HOLE TEST MWD TOOLS AT 910'
MD: GOOD TEST
FILL PIPE EVERY 20 STANDS
MONITOR WELL WITH HOLE FILLAND TRIP
TANK: GOOD DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
-PU/So = 98K/128K @ 2900'
19:00 20:00
1.00
CASING
P
3,135.00
SURF
CIRCULATE BOTTOMS UP
-
_
-550 GPM @ 1420 PSI
20:00 21:00
1.00
CASING
P
3,135.00
SURF
DISPLACE FROM 9.1 PPG MAX DRILL TO 9.3
PPG LSND
-650 GPM @1360 PSI
-ROTATE 50 RPM AND_ RECIPROCATE 90'
21:00 21:30
0.50
CASING
P
3,135.00
SURF
LUBRICATE RIG
21:30 00:0052
0
CASING
P
31135.00
SURF
HOLD DRILLS, WAIT ON CEMENT TO REACH
500 PSI
-WELL KILL DRILL WITH AAR
-FIRE DRILL
SIMOPS
-DERRICK INSPECTION
LOAD 4" PIPE INTO PIPE SHED.
10/6/2019 00:00 02:30
2.50
CASING
P
3,135.00
SURF
WELL KILL DRILL, WAIT ON CEMENT TO
REACH 500 PSI
-PERFORM TOP DRIVE DROPS INSPECTION
02:30 03:30
1.00
CASING
P
3,135.00 '',
SURF
RIG UP AND PRESSURE TEST CASING TO
3500 PSI FOR 30 MIN
- MUD WEIGHT IN/OUT = 9.3 PPG
PUMPED 3.8 BBLS BLED BACK 3.8 BBLS
LOST 35 PSI IN FIRST 15 MIN
LOST 10 PSI IN SECOND 15 MIN
TEST MET BP CRITERIA PER 100218
_
- WSUP APPROVED PRESSURE TEST
03:30 08:30
5.00
CASING
P
3,135.00
SURF
DRILL OUT FLOAT COLLAR AND CEMENT IN
SHOE TRACK FROM 2957' MD TO 3135' MD
- 750 GPM, 1810 PSI ON BOTTOM, 1740 PSI
OFF BOTTOM
- 60 RPM, 6 KFT-LBS TQ ON BOTTOM, 5
KFT-LBS TQ OFF BTM, 5-17 KLBS WOB
PU 125 KLBS, SO 100 KLBS, ROT 112 KLBS
_
MUD WEIGHT IN/OUT = 9.3 PPG
0830 0900
0.50
CASING
P
3,155.00
SURF
DRILL 3135-3155' MD
750 GPM, 1810 PSI ON BOTTOM, 1740 PSI
OFF BOTTOM
60 RPM, 6 KFT-LBS TQ ON BOTTOM, 5
KFT-LBS TQ OFF BTM, 5-17 KLBS WOB
PU 125 KLBS, SO 100 KLBS, ROT 112 KLBS
MUD WEIGHT IN/OUT = 9.3 PPG
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 11 of 55
Operation Summary Report
Common Well Name S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU - Site: S — - -
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
(hr)
_ _ _
(09:00 09:30 CASING P 3,(usft) SURF
CIRCULATE BOTTOMS UP BEFORE
I �
PERFORMING LOT
750 GPM, 1740 PSI
_
-MUD WEIGHT IN/OUT = 9.3 PPG
09:30 11:30 2.00 CASING P 3,155.00 SURF
RIG UP AND PERFORM LOT
MUD WEIGHT: 9.3 PPG, 2902' TVD, 3128' MD
PUMP 1.25 BBLS TO 357 PSI, BLEED BACK 1
'BELS
LOT EMW = 11.6 PPG
WSU P APPROVED LOT
11 30 23.30 12.00 DRILL P 4,427.00 INT1
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
j HOLE FROM 3155' MD TO 4427' MD, 4144' TVD.
1272' IN 12 HRS, ROP 106 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2070 PSI ON BOTTOM, 2050 PSI
OFF BOTTOM
120 RPM, 10 KFT-LBS TQ ON BOTTOM, 9
KFT-LBS TQ OFF BTM, 3-10 KLBS WOB
- PU 174 KLBS, SO 112 KLBS, ROT 131 KLBS
- SURVEY EVERY - 90 FT
- ECD: ACTUAL = 10.1 PPG, CLEAN = 9.94 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
- PUMP 35 BBL HIGH -VS SWEEPS EVERY 500'
MD WITH 25% INCREASE IN CUTTINGS
GASWATCH BACKGROUND RANGE = 50 TO
100 UNITS, MAX = 707 UNITS THROUGH COAL
SEAMS IN UG4 AND UG4A
23:30 00:00 0.50 DRILL P 4,427.00�INT1
LUBRICATE RIG
10/7/2019 00:00 12:00 12.00 DRILL P 5,824.00 INT1
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 4427' MD TO 5824' MD, 5082' TVD
1397 IN 12 HRS, ROP 116 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2350 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
120 TO 150 RPM, 15 KFT-LBS TQ ON
BOTTOM, 14 KFT-LBS TO OFF BTM, 15 KLBS
WOB
PU 217 KLBS, SO 120 KLBS, ROT 146 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL= 10.13 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
PUMP 35 BBL HIGH -VS SWEEPS AT 4688' MD
WITH 25% INCREASE IN CUTTINGS, 5161' MD
WITH 25% INCREASE IN CUTTINGS AND 5729'
MD WITH 75% INCREASE IN CUTTINGS
- GASWATCH BACKGROUND RANGE = 0 TO
50 UNITS, MAX AT 348 UNITS
* SPR'S AT 5545' MD, 4955' TVD
MP#1- 30 SPM= 160 PSI, 40 SPM= 220 PSI
MP#2- 30 SPM= 170 PSI, 40 SPM= 210 PSI
Printed 12/17/2019 11.2121AM
**All depths reported in Drillers Depths**
North America - ALASKA - BP
Page 12 or 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:0O:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
I
(usft)
-
12:00 22:00
-(hr)
10.00
DRILL P 6,742.00 INT1
— -
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 5824' MD TO 6742' MD, 5287' TVD
- 918' IN 10 HRS, ROP 92 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2360 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
75 TO 150 RPM, 16 KFT-LBS TQ ON BOTTOM,
15 KFT-LBS TQ OFF BTM, 15 KLBS WOB
ATTEMPT TO REDUCE VIBRATION BY
TURNING SOFT SPEED OFF WITH NO
(SUCCESS
PU 209 KLBS, SO 116 KLBS, ROT 140 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL= 10.06 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
PUMP 35 BBL HIGH -VS SWEEPS AT 6115' MD
WITH 25% INCREASE IN CUTTINGS, AND
6742' MD WITH LESS THAN 25% INCREASE IN
CUTTINGS
- GASWATCH BACKGROUND RANGE = 0 TO
150 UNITS, MAX AT 391 UNITS
I ' SPR'S AT 6742' MD, 5287' TVD
MP#1- 30 SPM= 180 PSI, 40 SPM= 240 PSI
MP#2- 30 SPM= 190 PSI, 40 SPM= 240 PSI
SIM OPPS WITH AD BUILD 4" STANDS OF DP
AND WORK 7-5/8" CASING
22:00 23:30 1 50 DRILL P 6,742.00 INT1
CIRCULATE BOTTOMS UP X 2 WITH SWEEP
DOWNLINK RIBS OFF
SURVEY ON BOTTOM
750 GPM, 2350 PSI
`
90 TO 100 RPM, 13 KFT-LBS
RECIPROCATE AT 750 FT/ HR
PU 193 KLBS, SO 116 KLBS
35 BBL HIGH -VIS SWEEP WITH 3%
INCREASE IN CUTTINGS
23:30 00:00 0.50 DRILL P
6,742.00 INTI
LUBRICATE RIG
10/8/2019 00.00 02:30 2.50 DRILL P
6,742.00 INT1
POOH ON ELEVATORS FROM 6742' MD TO
4322' MD
FLOW CHECK WELL, WELL IS STATIC
PU 209 KLBS, SO 116 KLBS
MUD WEIGHT IN/OUT = 9.3 PPG
PU 220 KLBS, SO 114 KLBS AT 6000' MD
30 KLBS OVERPULLAT 5493' MD
30 KLBS OVERPULLAT 4322' MDAND
_
OBSERVE WELL BEGIN TO SWAB
02:30 04:30 2.00 DRILL P 6,742.00 INT1
BACKREAM OUT OF HOLE FROM 4322' MD TO
3268' MD
750 GPM, 2030 PSI AT 4200' MD
60 RPM, 10 KFT-LBS TQ WITH 135 KLBS
ROTATING WEIGHT
BACKREAMING SPEEDS FROM 750 FT/ HR
TO 1500 FT/ HR
*AFTER PULLING FIVE STANDS AND
BOTTOMS UP ATTEMPTED TO PULL ON
ELEVATORS AT 3830' MD WITH NO SUCCESS
TILL SWABBING WITH NO OVERPULLS
Printed 12/17/2019 11 21.21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 13 of 55
Common Well Name: S-202
3080' MD
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
1.00
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
DRILL
P
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
I
Date IFrom - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
-- - --(hr)
- -
(usft)
P
i
04:30 - 05:00 0.50
DRILL P
6742.00 INT1
POOH ON ELEVATORS FROM 3270' MD TO
12:30 - 13:30 1.00
_J
DRILL I P
3080' MD
PU 155 KLBS
05:00
- 05:30
0.50
DRILL
P
-
INT1 CIRCULATE BOTTOMS UP FROM 10-3/4"
1.00
750 GPM, 1900 PSI
05:30
- 06:30
DRILL
P
06:30
I
07:30
I
P
1.00
DRILL
07:30
10:30
3.00
DRILL
I
P
i
10.30
INT1 RIH W 9 7/8" DRILLING BHA FROM 3080-6742
-RIH ON ELEVATORS
- 12:00
1.50 -
DRILL
P
it
1200
- 1230
0.50
DRILL
P
12:30 - 13:30 1.00
_J
DRILL I P
Printed 12/17/2019 11 21 21 AM *`All depths reported in Drillers Depths"
3080' MD
PU 155 KLBS
MONITOR WELL ON TRIP TANK
HOLE TAKING PROPER HOLE FILL
6,742.00
-
INT1 CIRCULATE BOTTOMS UP FROM 10-3/4"
CASING SHOE
750 GPM, 1900 PSI
RECIPROCATE 85' AT 1500 FT/ HR
FLOW CHECK WELL, WELL IS STATIC
6,742.00
INT1 SLIP AND CUT DRILLING LINE
CUT 68' OF DRILL LINE
CALIBRATE AMPHION SYSTEM
CHECK FLOOR SAVER / CROW_ N SAVER
6,742.00
INT1 TOP DRIVE INSPECTION
'DERRICK INSPECTION
6,742 00
INT1 RIH W 9 7/8" DRILLING BHA FROM 3080-6742
-RIH ON ELEVATORS
FILL PIPE EVERY 20 STDS
MUD WT IN 9.3 - MUD WT OUT 9.3
6,742.00
INT1 CIRCULATE AND CONDITION MUD
-750 GPM, 2360 PSI
-130 RPM, 13K TQ
-RECIPROCATE PIPE 60' @ 800 FT/HR
-PUMP HI -VIS SWEEP, 25% INCREASE IN
CUTTINGS.
*7 5/8 CSG ARRIVED - UNLOADED 22 JTS,
INSTALL IN PIPE SHED, STRAP, TALLY, DRIFT,
VAM REP INSPECT. UPDATE RUNNING TALLY.
6,764.00
INT1 DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 6742' MD TO 6764' MD, 5287' TVD
22" IN .2 HRS, ROP 92 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2360 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
- 100 RPM, 15 KFT-LBS TQ ON BOTTOM, 4
KFT-LBS TQ OFF BTM, 10 KLBS WOB
PU 209 KLBS, SO 116 KLBS, ROT 139 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL = 10.06 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
SPR'S AT 6742' MD, 5287' TVD
MP#1- 30 SPM= 180 PSI, 40 SPM= 240 PSI
MP#2- 30 SPM= 190 PSI, 40 SPM= 240 PSI
* SIM OPPS WITH AD BUILD 4" STANDS OF DP
AND WORK 7-5/8" CASING
6,764.00
INT1 CIR AND CONDITION HOLE FOR CASING.
-CBU X 1.5
750 GPM, 2360 PSI
-70-120 RPM, 13K TQ
-RECIPROCATE PIPE 60'@ 800 FT/HR
-PUMP HI -VIS SWEEP, 7% INCREASE IN
CUTTINGS.
-PU 221 K /SO 112K/ ROT 139K
*SIMOPS: BUILD 4" DP STANDS OFFLINE.
Printed 12/17/2019 11 21 21 AM *`All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 14 of 55
Common Well Well Name. S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time:
9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date
From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
- -
-
(hr)
—
(usft)
-
13:30 16:00
2.50
DRILL
P
6,764.00
INT1
POOH ON ELEVATORS FROM 6764' MD TO
3080' MD
I
-FLOW CHECK
-PU 221 KLBS
HOLE TAKING PROPER HOLE FILL
-FLOW CHECK AT SHOE
1600 1700
1.00
DRILL
P
6,764.00
INTI
POOH ON ELEVATORS FROM 3080' MD TO
990" MD
-FLOW CHECKAT BHA
MONITOR WELL ON TRIP TANK
HOLE TAKING PROPER HOLE FILL
17:00 19:00
2.00
DRILL
P
6,764.00
INT1
POOH /LAYDOWN BHA & BIT
-LD JARS
RCK BACK 5" HWDP
-LD DIRECTIONAL & LOGGING BHA TOOLS
'-BITGRADE 3 -2 -_BT_ -A_ -X -I -ER -TD
19:00 19:30
0.50
CASING
P
6,764.00
INT1
CLEAN AND CLEAR RIG FLOOR
PULL WEAR BUSHING
19:30 20:00
0.50
CASING
P
6,764.00 1
INT1
SERVICE RIG
20:00 21:00
1.00
CASING
P
6,764.00r
INT1
RIG UP CASING RUNNING TOOLS
RIG UP VOLANT TOOL, BAIL EXTENSIONS
AND ELEVATORS
DOUBLE STACK TONGS
FOSV AND XO
-
-RU HOLE FILL LINE
21:00 00:00
3.00
CASING
P
800.00
INT1
RUN 7 5/8", 29.7#, L-80, VAMTOP HC,
INTERMEDIATE CASING TO 967' MD
CASING SHOE AT 3128' MD
CHECK FLOATS (HOLDING)
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
j
FT -LBS
RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACK
FILL CASING EVERY 10 JOINTS
10/9/2019 00:00 04:00
4.00
CASING
P
6,764.00
INT1
RUN 7 5/8", 29.7#, L-80, VAMTOP HC,
INTERMEDIATE CASING TO THE SURFACE
CASING SHOE AT 3128' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
FT -LBS
RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACK
1
FILL CASING EVERY 10 JOINTS
04:00 04:30
0.50
CASING
P
6,764.00
INT1
CIRCULATE B/U AT 10 3/4" CSG SHOE
7 BPM, 225 PSI
04:30 13:30
9.00
CASING
P
6,764.00
INT1
CONTINUE RUNNING 7 5/8",29.7#, L-80,
VAMTOP HC, INTERMEDIATE CASING TO THE
SET DEPTH AT 6758' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
FT -LBS
RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACKAND 113 - 161
FILL CASING EVERY 10 JOINTS
Printed 12/17/2019 1121 21AM
"Ali depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: S-202
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
Page 15 of 55
AFE No
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
13:30 18:30 5.00
CASING P 6,764.00
INT1 CONDITION MUD TO CEMENTING
PROPERTIES
STAGE UP TO 7 BPM IN 1 BPM INCREMENTS
7 BPM, 470 PSI ICP, 400 PSI FCP
RECIPROCATE PIPE 15'
SIMOPS:
RIG UP SLB CEMENT EQUIPMENT
FILL LINES WITH WATER AND PRESSURE
TEST TO 3500 PSI FOR 5 MINUTES
READY TO PUMP CEMENT AT 18:30, SLB
NOTICED AIR LEAK ON PUMP TRUCK
18:30 20:00 1.50
CASING N 6,764.00
INT1 CONTINUE TO CIRCULATE WHILE WAITING IN
SLB TO REPAIR AIR LEAK ON PUMP TRUCK
20:00 22:30 2.50
CASING P 6,764.00
INT1 CEMENT 7-5/8" INTERMEDIATE CASING AS
FOLLOWS:
- PUMP 40 BBLS OF 12.5 PPG MUDPUSH II
SPACER @ 2-5 BPM, 200 PSI
RELEASE BOTTOM PLUG
PUMP 143 BBLS OF 15.8 PPG CLASS G TAIL
@ 6 BPM, EXCESS VOLUME 40% (YIELD 1.16
CU. FT/SK)
DROP TOP PLUG
RECIPROCATED PIPE 10 FT AT SURFACE
WHILE PUMPING CEMENT
PERFORM DISPLACEMENT WITH RIG PUMPS
AND 9.3 PPG LSND MUD PER SLB CADE
- 150 BBLS DISPLACED AT 10 BPM: ICP 315
PSI, FCP 315 PSI
- 136 BBLS DISPLACED AT 7 BPM: ICP 160 PSI,
FCP 1500 PSI, CATCH PRESSURE 176 BBL
INTO DISPLACEMENT
- REDUCE RATE TO 3 BPM PRIOR TO PLUG
BUMP: FINAL CIRCULATING PRESSURE 1275
PSI
- BUMP PLUG AND INCREASE PRESSURE TO
1800 PSI, CHECK FLOATS - GOOD
- TOTAL DISPLACEMENT VOLUME 306.6 BBLS
(MEASURED BY STROKES @ 96% PUMP
EFFICIENCY)
- RECIPROCATE PIPE 10 FTAT SURFACE
DURING DISPLACEMENT, STOPPED
RECIPROCATION AFTER MUDPUSH EXITED
THE SHOE DUE TO EXCESSIVE PICK UP
WEIGHTS
NO LOSSES
C I P AT 22:36
22:30 2300 0.50
CASING P 6,764.00
INTI CLOSE ANNULAR PREVENTER ON LANDING
JOINTAND ESTABLISH INJECTION DOWN THE
7-5/8" X 10-3/4" CASING ANNULUS
2 BPM, UP TO 780 PSI
INJECT 5 BBL
23:00 00:00 1.00
CASING P 6,764.00
INTI LAY DOWN LANDING JOINT AND RIG DOWN
CASING RUNNING EQUIPMENT
10/10/2019 0000 01:30 1.50
CASING P 6,764.00
INTI RIG DOWN CASING RUNNING EQUIPMENT
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
- 225 GPM, 1220 PSI, 60 RPM, 8 KFT-LBS
TORQUE - — —
10/11/2019 00:00 01:00 1.00 DRILL P 6,764.00 INT1 DRILL OUT SHOE TRACK TO 6748' MD (10'
FROM SHOE)
300 GPM, 1780 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
— --
-MUD WEIGHT IN/OUT = 9.3 PPG
01:00 02:30 1.50 1 DRILL P 6,764.00 INT1 DISPLACE WELL FROM 9.3 PPG LSND TO 9.1
PPG QUICKDRIL-N
300 GPM, ICP 1850 PSI, FCP 1250 PSI
60 RPM, 8 KFT-LBS TORQUE
RECIPROCATE 80'
MONITOR WELL FOR 15 MIN (STATIC)
02:30 03:00 050 DRILL P 6,764.00 INTI DRILL OUT CEMENT AND FLOAT SHOE TO
6764' MD
300 GPM, 1225 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 15 MIN (STATIC)
Printed 12/17/2019 11.21 21 AM **All depths reported in Drillers Depths**
North America
- ALASKA
- BP
Page 16 of 55
FREEZE PROTECT OA WITH 85 BBL OF 9.8
Operation Summary Report
Common Well Name: 5-202
PPG BRINE AT 2 BPM, 900 PSI TO 700 PSI
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 .00 )
Project: PBU
19:00
Site: S
j CASING
P
6,764.00
INTI
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
ON 4" DP FROM 157' MD TO 6745' MD
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
SHALLOW TEST DIRECTIONAL TOOLS AT
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
19:00
(hr)
0.50
CASING
(usft)
6,764.00
INT1
101:30 - 04:00
2.50
CASING
P
6,764.00
INT1
INSTALL 7-5/8" CASING PACKOFF
INT1
PRESSURE TEST 7-5/8" CASING TO 3500 PSI
PRESSURE TEST PACKOFF TO 3500 PSI
FOR 30 MIN
FOR 15 MIN
TEST APPROVED BY WOS (WSUP DOA)
20:30
- 00:00
TEST APPROVED BY WOS (WSUP DOA)
DRILL
P
6,764.00
INT1
WASH DOWN AT 2 BPM FROM 6475' MD, TAG
SIMOPS:
TOP OF CEMENT AT 6606' MD
CHANGE OUT UPPER RAMS TO 2-7/8" X 5"
VBRS
CHANGE OUT SAVER SUB TO HT -38
04:00 05:30
1.50
CASING
P
6,764.00
INT1
CHANGE OUT UPPER RAMS TO 2-7/8" X 5"
VBRS
CHANGE OUT SAVER SUB TO HT -38
'05:30 08:30 T
3.00
CASING
P
6,764.00
INT1
PRESSURE TEST UPPER RAMS TO 250 PSI
LOWAND 3500 PSI HIGH FOR 5 MIN EACH
TEST WITH 4" AND 4-1/2" TEST JOINTS
08:30 - 09:30
1.00
CASING
P
6,764.00
INT1
'RIG DOWN TESTING EQUIPMENT
- PULL TEST PLUG AND SET WEAR BUSHING
(9" ID)
09:30 14:00
4.50
CASING
P
6,764.00
INT1
MAKE UP 6-3/4" PROD1 BHA TO TOTAL
LENGTH OF 157' MD
SIMOPS:
- 225 GPM, 1220 PSI, 60 RPM, 8 KFT-LBS
TORQUE - — —
10/11/2019 00:00 01:00 1.00 DRILL P 6,764.00 INT1 DRILL OUT SHOE TRACK TO 6748' MD (10'
FROM SHOE)
300 GPM, 1780 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
— --
-MUD WEIGHT IN/OUT = 9.3 PPG
01:00 02:30 1.50 1 DRILL P 6,764.00 INT1 DISPLACE WELL FROM 9.3 PPG LSND TO 9.1
PPG QUICKDRIL-N
300 GPM, ICP 1850 PSI, FCP 1250 PSI
60 RPM, 8 KFT-LBS TORQUE
RECIPROCATE 80'
MONITOR WELL FOR 15 MIN (STATIC)
02:30 03:00 050 DRILL P 6,764.00 INTI DRILL OUT CEMENT AND FLOAT SHOE TO
6764' MD
300 GPM, 1225 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 15 MIN (STATIC)
Printed 12/17/2019 11.21 21 AM **All depths reported in Drillers Depths**
FREEZE PROTECT OA WITH 85 BBL OF 9.8
PPG BRINE AT 2 BPM, 900 PSI TO 700 PSI
SHUT IN OA WITH 500 PSI
14:00
19:00
5.00
j CASING
P
6,764.00
INTI
RUN IN THE HOLE WITH 6-3/4" DRILLING BHA
ON 4" DP FROM 157' MD TO 6745' MD
SHALLOW TEST DIRECTIONAL TOOLS AT
400' MD
19:00
19:30
0.50
CASING
P
6,764.00
INT1
RIG UP TO PRESSURE TEST 7-5/8" CASING
19:30
- 20:30
1.00
CASING
P
6,764.00
INT1
PRESSURE TEST 7-5/8" CASING TO 3500 PSI
FOR 30 MIN
TEST APPROVED BY WOS (WSUP DOA)
20:30
- 00:00
3.50
DRILL
P
6,764.00
INT1
WASH DOWN AT 2 BPM FROM 6475' MD, TAG
TOP OF CEMENT AT 6606' MD
DRILL OUT FLOAT COLLAR AND CEMENT TO
6679' MD
- 225 GPM, 1220 PSI, 60 RPM, 8 KFT-LBS
TORQUE - — —
10/11/2019 00:00 01:00 1.00 DRILL P 6,764.00 INT1 DRILL OUT SHOE TRACK TO 6748' MD (10'
FROM SHOE)
300 GPM, 1780 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
— --
-MUD WEIGHT IN/OUT = 9.3 PPG
01:00 02:30 1.50 1 DRILL P 6,764.00 INT1 DISPLACE WELL FROM 9.3 PPG LSND TO 9.1
PPG QUICKDRIL-N
300 GPM, ICP 1850 PSI, FCP 1250 PSI
60 RPM, 8 KFT-LBS TORQUE
RECIPROCATE 80'
MONITOR WELL FOR 15 MIN (STATIC)
02:30 03:00 050 DRILL P 6,764.00 INTI DRILL OUT CEMENT AND FLOAT SHOE TO
6764' MD
300 GPM, 1225 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 15 MIN (STATIC)
Printed 12/17/2019 11.21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 17 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
03:00 12:00
9.00 DRILL P 7,386.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 6764' MD TO 7386' MD
622 FT IN 9 HRS: 69 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1500 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 162 KLBS, SO 77 KLBS, ROT 107 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
12:00 00:00 12.00 DRILL P 8,240.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 7386' MD TO 8240' MD
854 FT IN 12 HRS: 71 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1650 PSI ON/OFF BOTTOM
100 - 130 RPM, 9 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 150 KLBS, SO 80 KLBS, ROT 104 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
10/12/2019 00:00 12 00 12.00 DRILL P 8,971.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 8240' MD TO 8971' MD
731 FT IN 12 HRS: 61 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1720 PSI ON/OFF BOTTOM
100 - 130 RPM, 9 KFT-LBS TORQUE ON, 8
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 172 KLBS, SO 72 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 8280' MD,
10% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8850' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11 21.21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 18 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) ___
00:00 12.00 DRILL P I
12:00 9,7763.63. 00 PROD1
i DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 8971' MD TO 9763' MD
792 FT IN 12 HRS: 66 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1850 PSI ON/OFF BOTTOM
120 - 150 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 168 KLBS, SO 70 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 9128' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9414' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9606' MD,
.25% INCREASE IN CUTTINGS BACKAT
SHAKERS
PERFORM WEEKLY BOPE FUNCTION TEST
10/13/2019 0000 1500 15.00 DRILL P 10,740.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 9763' MD TO 10740' MD
977 FT IN 15 HRS: 65 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1880 PSI ON/OFF BOTTOM
120 - 130 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 175 KLBS, SO 35 KLBS, ROT 80 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 9891' MD,
75% INCREASE IN CUTTINGS BACK AT
(SHAKERS
UNABLE TO SLACK OFF WITHOUT
ROTATION DUE TO FRICTION, DECISION
MADE TO PULL OUT OF THE HOLE AND ADD
MORE PUSH PIPE BELOW THE HWDP
1500 18.30 3.50 DRILL P 10,740.00 PROD1
BACKREAM OUT OF THE HOLE FROM 10740'
MD TO 9411' MD
320 GPM, 1875 PSI
140 RPM, 12 KFT-LBS TORQUE
600-800 FPH PULLING SPEED
NO ISSUES WHILE BACKREAMING
MONITOR WELL FOR 10 MIN (STATIC)
OBSERVED A SIGNIFICANT AMMOUNT OF
FINE CUTTINGS AT SHAKERS WHILE
BAC KR EAM I N G
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 19 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
Site: S
Project: PBU
~i
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code I NPT Total Depth Phase
Description of Operations
(hr)
(usft)
18:30 - 22:00 3.50
DRILL P 10,740.00 PROD1
PULL OUT OF THE HOLE ON ELEVATORS
FROM 9411' MD TO THE 7-5/8" CASING SHOE
AT 6758' MD
- BACKREAM TIGHT SPOTS AT 8515' MD AND
7470' M D
- MONITOR WELL AT THE CASING SHOE FOR
10 MN (STATIC)
22 00 23:00 1.00
DRILL P 10,740.00 PROD1
CIRCULATE THE HOLE CLEAN
320 GPM, 1600 PSI
80 RPM, 7 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 10% INCREASE IN CUTTINGS
BACK AT SHAKERS
23:00 00:00 1.00
DRILL P 10,740.00 PROD1
PULL OUT OF THE HOLE ON ELEVATORS
FROM _6758' MD TO 4600' MD
10/14/2019 0000 01:00 1.00
DRILL P 10,740.00 PROD1
PULL OUT OF THE HOLE RACKING BACK THE
HWDP FROM 4600' MD TO 3282' MD
I
- MONITOR WELL FOR 10 MIN AT THE TOP OF
_
THE HWDP (STATIC)
01:00 05:30 4.50
DRILL P 10,740.00 PROD1
RUN IN THE HOLE ON ELEVATORS FROM
3282' MD TO BOTTOM AT 10740' MD
RUN ADDITIONAL 54 STANDS OF 4" DP
BELOW THE HWDP FOR A TOTAL OF 87
STANDS BELOW THE HWDP
WASH DOWN LAST STAND AT 2 BPM, 450
PSI -- -
05:30 1200 6.50
DRILL P 11,154.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 10740' MD TO 11154' MD
- 414 FT IN 6.5 HRS: 64 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1800 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 6 KLBS WOB
PU 175 KLBS, SO 40 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
PUMP 35 BBL HIGH VIS SWEEP AT 11027'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths"
10/15/2019 00:00 00:30 0.50 DRILL N 11,827.00 PROD1 TROUBLESHOOT MWD
GAMMA SENSORS NOT RESPONDING ON
AZITRACK
DISCUSS WITH TOWN GEO, DECISION
MADE TO CONTINUE DRILL WITH
RESISTIVITY SENSORS
00:30 17:30 17.00 DRILL P 12,777.00 PROD1 DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 11 827'MD TO 12777' MD
950 FT IN 17 HRS: 56 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1830 PSI ON/OFF BOTTOM
140 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 168 KLBS, SO 71 KLBS, ROT 108 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11880'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEPAT 12177'
MD, 25% INCREASE IN CUTTINGS BACK AT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12340'
MD, NO INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 20 of 55
Operation Summary Report
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW001 9CM-EX-D1 -DN- (16,199,881 00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00 OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
12:00 00:00
12.00
DRILL P 11,827.00
PROD1
:DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 111 54'MD TO 11 827'MD
673 FT IN 12 HRS: 56 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
!PROGRAM
320 GPM, 1770 PSI ON/OFF BOTTOM
140 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 6 KLBS WOB
PU 148 KLBS, SO 73 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11315'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL LOW VIS FOLLOWED BY 35
BBL HIGH VIS SWEEP AT 11 595'MD, 100%
INCREASE IN CUTTINGS BACKAT SHAKERS
- INCREASE LUBES TO 3% TO HELP WITH
DRAG (ADDED 1% NXS LUBE)
- PU WEIGHT REDUCED FROM 175 KLBS TO
148 KLBS
- SO WEIGHT INCREASED FROM 40 KLBS TO
73 KLBS
- TORQUE REDUCED FROM 11 KFT-LBS TO 9
KFT-LBS
ERRATIC PIPE MOVEMENT ON SURFACE
10/15/2019 00:00 00:30 0.50 DRILL N 11,827.00 PROD1 TROUBLESHOOT MWD
GAMMA SENSORS NOT RESPONDING ON
AZITRACK
DISCUSS WITH TOWN GEO, DECISION
MADE TO CONTINUE DRILL WITH
RESISTIVITY SENSORS
00:30 17:30 17.00 DRILL P 12,777.00 PROD1 DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 11 827'MD TO 12777' MD
950 FT IN 17 HRS: 56 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1830 PSI ON/OFF BOTTOM
140 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 168 KLBS, SO 71 KLBS, ROT 108 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11880'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEPAT 12177'
MD, 25% INCREASE IN CUTTINGS BACK AT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12340'
MD, NO INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 21 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
-_�
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs Task
Code
NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
17:30 - 19:30
2.00 DRILL
P
12,777.00
PROD1
CIRCUALTE THE HOLE CLEAN WITH 2X
BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 50% INCREASE IN CUTTINGS
BACK AT SHAKERS
MONITOR THE WELL PRIOR TO PULLING
OFF BOTTOM FOR 10 MIN_ (STATIC)
19:30 23:00
3.50 DRILL P
12,777.00
PROD1
PULL OUT OF THE HOLE FROM 12150' MD TO
THE 7-5/8" CASING SHOE AT 6758' MD
- MONITOR THE WELL AT THE CASING SHOE
FOR 10 MIN (STATIC)
-NO_ ISSUES PULLING THROUGH OPEN HOLE
23:00 00:00
1.00 DRILL P
12,777.00
PROD1
CIRCULATE BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE
10/16/2019 00:00 03:00
3.00 DRILL P
12,777.00
PROD1
RUN IN THE HOLE ON ELEVATORS FROM
6758' MD TO BOTTOM AT 12777' MD
- NO ISSUES RUNNING THROUGH OPEN
HOLE
03:00 05:00
2.00 DRILL P
12,777.00
PROD1
CIRCULATE THE HOLE CLEAN WITH 2X
BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 25% INCREASE IN CUTTINGS
BACK AT SHAKERS
- MONITOR THE WELL PRIOR TO PULLING
OFF BOTTOM FOR 10 MIN -(STATIC)
05:00 12:30
7.50 DRILL P
12,777.00
PROD1
PULL OUT OF THE HOLE TO RUN LINER
FROM 12777' MD TO THE TOP OF THE
DIRECTIONAL BHA AT 157' MD
MONITOR THE WELL FOR 10 MIN AT THE
CASING SHOE AND AT THE TOP OF THE BHA
_
(STATIC)
12:30 13:30
1.00 DRILL P
12,777.00
PROD1
LAY DOWN THE BHA
BIT GRADE:2-2-IN GAGE
13:30 1400
0.50 DRILL P
12,777.00
PROD1
CLEAN AND CLEAR THE RIG FLOOR
FUNCTION TEST THE BLIND RAMS
14:00 1500
1.00 CASING P
12,777.00
PROD1
RIG UP CASING RUNNING TOOLS
- AIR SLIPS, DOUBLE STACK TONGS, AND
_
ELEVATORS
15:00 22:00
7.00 CASING P
12,777.00
PROD1
RUN 4-1/2".12.6#, L-80, VAMTOP AND DWC
PROD1 SLOTTED LINER TO TOTAL LENGTH
OF 5297' MD
USE JET LUBE SEAL GUARD PIPE DOPE ON
VAM CONNECTIONS AND BEST -O -LIFE 2000
ON DWC CONNECTIONS
- TORQUE VAM CONNECTIONS TO 4440
FT -LBS AND DWC CONNECTIONS TO 6150
FT -LBS
- RUN 1 CENTRALIZER FREE FLOATING ON
EVERY OTHER JOINT
PU 92K, SO 77K
MAKE UP LINER BILLETASSEMBLY
SIMOPS:
- PERFORM TOP JOB AROUND THE
CONDUCTOR, PUMP 15 BBL OF CEMENT
Printed 12/17/2019 11:21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 22 of 55
Common Well Name: S-202
02:00
200
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
Project: PBU
Site: S -
- - - - -
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019
11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
L (usft)
22:00 - 00:00 2.00
CASING P
12,777.00
PROD1
CONTINUE IN HOLE TO 10030' MD ON 4" DRILL
10/17/2019 0000
02:00
200
CASING
P
02:00
03.30
1.50
CASING
P
03 30 - 0900 5.50 CASING P
09 00 - 15:00 6 00 CASING N
PIPE
PU 97K, SO 77K
12,777.00 PROD1 CONTINUE IN HOLE FROM 10030' MD TO
PLANNED SET DEPTH AT 12777' MD ON 4"
DRILL PIPE
TAG BOTTOM 2X WITH 15 KLBS
PU 160 KLBS, S-0-65 KLBS
12,777.00 PROD1 ATTEMPT TO RELEASE FROM LINER
- STAGE PUMP UP TO 5 BPM, 425 PSI PRIOR
TO DROPPING BALL TO CONFIRM FLOW PATH
DROP 1-1/4" PHENOLIC BALL, PUMP DOWN
AT 5 BPM, 425 PSI TO 500 STKS, LOWER RATE
TO 2 BPM, 250 PSI, BALL LANDED AT 622
STKS, CALCULATED = 839 STKS
- SET DOWN TO 65 KLBS, PRESSURE UP TO
2500 PSI, WORK PIPE FROM PICK UP WEIGHT
TO SLACKOFF WEIGHT WITH NO SUCCESS
STAGE PUMPS UP TO 4500 PSI IN 500 PSI
INCREMENTS AND WORK PIPE BETWEEN
PICK UP WEIGHTAND BLOCK WIEIGHTAT 35
KLBS WITH NO SUCCESS
- DISCUSS PLAN FORWARD WITH
ANCHORAGE TEAM, DECISION MADE TO
PULL LINER TOP TO THE RIG FLOOR AND LAY
DOWN THE BILLETASSEMBLY TO
TROUBLESHOOT
12,777 00 PROD1 PULL OUT OF THE HOLE FROM 12777' MD TO
THE TOP OF THE LINER AT SURFACE AT 5297'
MD
INSPECT SETTING TOOL, BALL ON SEAT AS
EXPECTED, NO ISSUES OBSERVED
12,777.00 PROD1 DISCUSS PLAN FOWARD WITH ANCHORAGE
TEAM, DECISION MADE TO RUN BILLET
ASSEMBLY WITH GS SPEAR
- WAIT FOR SPEAR / BILLET ASSEMBLY TO
ARRIVE ON LOCATION
SIMOPS:
SLIP AND CUT DRILL LINE
PEFORM PREVENTATIVE MAINTENANCE
WORK ORDERS
- DERRICK INSPECTION
Printed 12/17/2019 11 21 21 AM "All depths reported in Drillers Depths"
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth ! Phase Description of Operations
(hr) (usft)
15:00 21:30 6.50 CASING 'i, N 12,777.00 PROD1 MAKE UP NEW BILLET ASSEMBLY WITH GS
SPEAR AND RUN IN THE HOLE FROM 5297'
MD TO BOTTOM AT 12777' MD
FINAL PU 148 KLBS, SO 69 KLBS
BUMPER SUB OPEN AT 127 KLBS, CLOSED
AT 93 KLBS
CIRCULATE 1 DP VOLUME WITH THE LINER
TOP AT THE 7-5/8" CASING SHOE AT 5 BPM,
2250 PSI
CIRCULATE 1 DP VOLUME WITH LINER TOP
HALF WAY THROUGH OPEN HOLE AT 5 BPM,
2175 PSI
CIRCULATE 1 DP VOLUME WITH LINER ON
BOTTOM AT 5 BPM, 2250 PSI
PERFORM ALL CIRCULATIONS WITH PIPE IN
TENSION
SLACK OFF TO 65 KLBS WHILE
CIRCULATING AT 5 BPM, TAG BOTTOM AND
PICK UP TO RELEASE OFF LINER
_7 LINER TOP AT 7480' MD
21:30 00:00 2.50 CASING P 12,777.00 PROD1 PULL OUT OF THE HOLE FROM 7480' MD TO
_ 2840' MD AT MIDNIGHT
10/18/2019 00:00 01:30 1.50 CASING P 12,777.00 PROPULL OUT OF THE HOLE FROM 2840' MD PROMTO
SURFACE
INSPECT RUNNING TOOL, NO ISSUES
_ :OBSERVED
01:30 02:00 0.50 BOPSUR P 12,777.00 PROD2 CLEAN AND CLEAR RIG FLOOR
02:00 04:00 2.00 BOPSUR P 12,777.00 PROD2 RIG UP TO PRESSURE TEST BOPE
PULL WEAR BUSHING AND INSTALL TEST
'PLUG
RIG UP TEST JOINT
I- FILL LINES AND PURGE AIR FROM SYSTEM
04:00 - 08:30 4.50 BOPSUR t P 12,777.00 PROD2 TEST ROPE TO 250 PSI LOW, 3500 PSI HIGH
1 FOR 5 MINUTES EACH
TEST WITH 4" AND 4-1/2" TEST JOINTS
ALL TESTS CHARTED, SEE ATTACHED BOP
TEST CHARTS
TEST WITNESS WAIVED BY AOGCC REP
LOU LAUBENSTEIN
08:30 09:30 1.00 BOPSUR P 12,777.00 PROD2 RIG DOWN TESTING EQUIPMENT
- PULL TEST PLUG AND SET WEAR BUSHING
(9" ID)
- BREAK DOWN TEST JOINT
BLOW DOWN ALL SURFACE LINES
09:30 12:30 3.00 DRILL P 12,777.00 PROD2 MAKE UP 6-3/4" PROD2 BHA TO TOTAL
LENGTH OF 157' MD
SMITH AXEBLADE PDC BIT, AUTOTRAK
EXACT, MWD/LWD
12:30 17:30 5.00 DRILL P 7,292.00 PROD2 RUN IN THE HOLE WITH PROD2 DRILLING
BHA FROM 15T MD TO 7292' MD
SHALLOW HOLE TEST THE DIRECTIONAL
TOOLS AT 200' MD AND 600' MD
TAG OBSTRUCTION AT 7292' MD, ATTEMPT
TO WORK PAST OBSTRUCTION WITH UP TO
30 KLBS AND 6 BPM WITH NO SUCCESS
DISCUSS PLAN FORWARD WITH
ANCHORAGE TEAM, DECISION MADE TO
PERFORM OPEN HOLE SIDETRACK AT
CURRENT DEPTH
Printed 12/17/2019 11.21:21AM **All depths reported in Drillers Depths"'
North America - ALASKA - BP
Operation Summary Report
Page 24 of 55
Common Well Name S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
- - (hr) '_ — (usft) -I-
1T.30 00:00 6.50 DRILL P 7,292.00! PROD2
PERFORM OPEN HOLE SIDETRACK AT 7242'
MD
TROUGH UP TO 60', STAGING UP FROM 3'
TO 60' PER BAKER PROCEDURE
260 GPM, 1075 PSI
110 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
10/19/2019 00:00 13:00 13.00 DRILL P 7,284.00 PROD2
PERFORM OPEN HOLE SIDETRACK FROM
7242' MD TO 7284' MD
TIME DRILL PER BAKER PROCEDURE
260 GPM, 1075 PSI
110 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
UNABLE TO ACHIEVE OPEN HOLE
SIDETRACK, DECISION MADE TO ATTEMPT
TO SIDETRACK OFF THE OBSTRUCTION AT
7292' MD
13:00 22:00 9.00 DRILL P 7,348.00 PROD2
PERFORM OPEN HOLE SIDETRACK FROM
7284' MD TO 7348' MD
TIME DRILL PER BAKER PROCEDURE
260 GPM, 1075 PSI
100 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
WHILE TIME DRILLING OBSERVE LOSS OF
BIT WEIGHT, DISCUSS WITH ODE AND
INCREASE ROP TO MAINTAIN BIT WEIGHT,
OBSERVE INDICATION OF DEPARTURE FROM
PARENT WELLBORE WITH NEAR BIT
INCLINATION
22:00 00:00 2.00 DRILL P 7,444.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 7348' MD TO 7444' MD
96 FT IN 2 HRS: 48 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
260 GPM, 1075 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 4 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 115 KLBS, SO 89 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5°, NO BACK
REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
10/20/2019 00:00 01:00 I 1.00 DRILL P 7,537.00 FROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 7444' MD TO 7537' MD
93 FT IN 1 HRS: 93 FT/HR ROP
260 GPM, 1075 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 4 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 115 KLBS, SO 89 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5°, NO BACK
REAMING AT CONNECTIONS
I - MUD WEIGHT IN/OUT = 9.0 PPG
01:00 03:00 2.00 DRILL N 7,537.00 PROD2
PULL OUT OF THE HOLE ON ELEVATORS TO
THE SHOE AND RUN BACK TO BOTTOM
CALIBRATE THE CALIPER INSIDE THE
CASING
EVALUATE THE SIDETRACK JUNCTION ON
THE WAY BACK IN THE HOLE (NO ISSUES
RUNNING BACK INTO THE SIDETRACK)
Printed 12/17/2019 11.21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 25 of 55
Common Well Name: S-202
00:00
12.00
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00 OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
-- (hr--)
—
(us ft)- -
F
--DIRECTIONAL
03:00 - 12:00 9.00
DRILL P
8,015.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 7537' MD TO 8015' MD
12:00
00:00
12.00
DRILL
P
I
10/21/2019 00:00
12:00
12.00
DRILL
P
- 478 FT IN 9 HRS. 53 FT/HR ROP, ADJUST
ROP AS NEEDED FOR DIRECTIONAL
CONTROL
320 GPM, 1400 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 5 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 126 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5°, NO BACK
REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 7820' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
8,797.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 8015' MD TO 8797' MD
782 FT IN 12 HRS: 65 FT/HR ROP, ADJUST
ROPAS NEEDED FOR DIRECTIONAL
CONTROL
320 GPM, 1450 PSI ON/OFF BOTTOM
150 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 150 KLBS, SO 77 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
- MUD WEIGHT IN/OUT = 9.1 PPG
- PUMP 35 BBL HIGH VIS SWEEP AT 8110' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8393' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8677' MD,
25% INCREASE IN CUTTINGS BACK AT
SHAKERS
9,470.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 8797' MD TO 9470' MD
- 673 FT IN 12 HRS: 56 FT/HR ROP, ADJUST
ROP AS NEEDED FOR DIRECTIONAL
CONTROL, 140 FPH MAX
320 GPM, 1600 PSI ON/OFF BOTTOM
140 RPM, 8 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 147 KLBS, SO 77 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 9058' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9420' MD,
150% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11:21 21 AM **All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 26 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
12:00 - 00:00 1200 DRILL P 9,470.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 9470' MD TO 10465' MD
995 FT IN 12 HRS: 83 FT/HR ROP, LIMIT ROP
TO 140 FPH MAX
320 GPM, 1675 PSI ON/OFF BOTTOM
140 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 158 KLBS, SO 79 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 9606' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9893' MD,
50% INCREASE IN CUTTINGS BACK AT
'SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 10179'
MD, 75% INCREASE IN CUTTINGS BACKAT
SHAKERS
10/22/2019 00:00 - 12:00 12.00 DRILL P 11,530.00 PROD2
'DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 10465' MD TO 11 530'MD
1065 FT IN 12 HRS: 89 FT/HR ROP, LIMIT ROP
{ TO 140 FPH MAX
320 GPM, 1775 PSI ON/OFF BOTTOM
140 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 179 KLBS, SO 70 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 10465'
MD, 50% INCREASE IN CUTTINGS BACK AT
ISHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 10743'
MD, 50% INCREASE IN CUTTINGS BACK AT
ISHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 11027'
MD, 50% INCREASE IN CUTTINGS BACK AT
ISHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 11318'
MD, 50% INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 27 of 55
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date i From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
— (hr)
(usft) -
-
12:00 00:00 12.00
DRILL P 12,261.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 11 530'MD TO 12261' MD
731 FT IN 12 HRS: 61 FT/HR ROP, LIMIT ROP
TO 140 FPH MAX
320 GPM, 1875 PSI ON/OFF BOTTOM
140 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 178 KLBS, SO 67 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11600'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 11885'
MD, 10% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12165'
MD, 50% INCREASE IN CUTTINGS BACKAT
4
-
11
SHAKERS
- - --
10/23/2019 00:00 - 12:30
12.50
DRILL
P
13,189.00 PROD2
'DIRECTIONAL DRILL 6-314" PROD2 HOLE
I
�
FROM 12261' MD TO 13189' MD
928 FT IN 12.5 HRS: 74.3 FT/HR ROP, LIMIT
ROP TO 140 FPH MAX
320 GPM, 1888 PSI ON/OFF BOTTOM
140 RPM, 11-13 KFT-LBS TORQUE ON, 12
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 195 KLBS, SO 65 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 12451'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12761'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
12.30 14:00 1.50
DRILL P 13,189.00 PROD2
DOWNLINK RIBS OFF AND CIRCULATE HOLE
CLEAN AT TD WITH A 40 BBL HI -VIS SWEEP
SURFACE TO SURFACE
- 320 GPM, 1888 PSI, 140 RPM, 12.5 KFT-LBS
TORQUE
25% INCREASE IN CUTTINGS BACKAT
SHAKERS WITH SWEEP AT SURFACE
MONITOR WELL FOR 10 MIN: STATIC
Printed 12/17/2019 11.21 21 AM "All depths reported in Drillers Depths"'
North America - ALASKA - BP
Operation Summary Report
Page 28 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019
End Date: 11/15/2019
H-S41DW0019CM-EX-D1-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
14:00 - 21:30 i 7.50 DRILL P 13,189.00 PROD2
PLANNED WIPER TRIP: PULL OUT OF THE
HOLE FROM 13189' MD TO ABOVE THE 7-5/8"
SHOE
MONITOR WELL FOR 10 MINUTES: STATIC
PU 195 KLBS, SO 65 KLBS AT 13189' MD
MUD WT IN/OUT 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
TIGHT HOLE AT 12560' MD WITH UP TO 25
KLBS OVERPULL
I
- BACKREAM FROM 12560' MD TO 12630' MD
CONTINUE TO PULL ON ELEVATORS FROM
12630' MD TO 11630' MD
TIGHT HOLE AT 11630' MD WITH UP TO 25
KLBS OVERPULL
BACK REAM FROM 11630' MD TO 11120' MD
CONTINUE TO PULL ON ELEVATORS FROM
11120' MD TO 6680' MD' MD
21.30 23.00 1.50 DRILL P 13.189 00 PROD2
CIRCULATE THE HOLE CLEAN AT THE 7-5/8"
SHOE WITH 2X BOTTOMS UP
320 GPM, 1318 PSI
MONITOR WELL FOR 10 MINUTES: STATIC
23:00 00:00 1.00 DRILL P 13,189.00 PROD2
PLANNED WIPER TRIP: RUN IN THE HOLE
WITH 6 3/4" DRILLING BHA FROM 6758' MD TO
7537' MD
PU 139 KLBS, SO 85 KLBS AT 6758' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
SET DOWN 25 KLBS AT 7290' MD: SIDETRACK
JUNCTION
- ATTEMPT TO WORK THROUGH SIDETRACK
JUNCTION SEVERAL TIMES WITHOUT
SUCCESS
- WASH THROUGH JUNCTION AND INTO
SIDETRACK WITH 1 BPM, 232 PSI
CONTINUE TO RUN IN THE HOLE ON
ELEVATORS FROM 7345' MD TO 7537' MD
10/24/2019 00 00 03:30 3 50 DRILL P 13,189.00 PROD2
PLANNED WIPER TRIP: CONTINUE TO RUN IN
THE HOLE WITH 6 3/4" DRILLING BHA FROM
7537' MD TO 13189' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
PU 185 KLBS, SO 65 KLBS AT 13189' MD
TIGHT HOLE:
- 20 KLBS AT 11 790'MD; 15 KLBS AT 12050' MD,
15 KLBS AT 12350' MD, 25 KLBS AT 12500' MD
- 12540' MD: 25-30 KLBS: HAD TO WORK PIPE
SEVERAL TIMES TO GET THROUGH
Printed 12/17/2019 11.21:21 AM **All depths reported in Drillers Depths`*
North America - ALASKA - BP
Page 29 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
03:30 05:30 2.00 DRILL P
13,189.00 PROD2
CIRCULATE HOLE CLEAN AT TD PRIOR TO
PULLING OUT OF THE HOLE
CIRCULATE 2X BOTTOMS UP
320 GPM, 1976 PSI, 120 RPM, 11.5 KFT-LBS
iTROQUE
SPOT 4% LUBE PILL IN OPEN HOLE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
SINIFICANT INCREASE IN CUTTINGS AT FIRST
BOTTOMS UP. HOLE CLEANED UP AFTER
1.5X BOTTOMS UP STROKES
05.30 - 13:30 8.00 DRILL
P 13,189.00 ? PROD2
PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" DRILLING BHA FROM 13189' MD
TO 157' MD
MONITOR WELL FOR 10 MINUTES PRIOR TO
PULLING OFF BOTTOM AND AT 7-5/8" CASING
SHOE: STATIC
PU 185 KLBS, SO 65 KLBS AT 13186'M D
MUD WEIGHT IN/OUT = 9.1 PPG
PULL TO 12355' MD AND RUN BACK THROUGH
TO 12620' MD
NO ISSUES PULLING THROUGH OR
RUNNING BACK DOWN THROUGH TIGHT
SPOT OBSERVED ON WIPER TRIP
PULLABOVE JUNCTION TO 7260' MD AND
RUN BACK THROUGH TO 7339' MD
NO ISSUES PULLING THROUGH OR
RUNNING DOWN THROUGH SIDETRACK
JUNCTION
DROP 2.4" DRIFT ON STAND 69
13.30 15:00 1 50 DRILL PP 13,189.00 PROD2
LAY DOWN 6-3/4" DRILLING BHA PER BAKER
DD/MWD
REMOVE SOURCES
LAY DOWN WORN AND DAMAGED BHA
COMPONENTS
-DULL BIT GRADE: 1-1-NO-A-X-I-NO-
!TD
1500 15 30 0.50 CASING P 13,189.00 PROD2
RIG UP TO RUN 4-1/2" SLOTTED LINER
RIG UP DOYON CASING TONGS
VERIFY PIPE COUNT IN PIPE SHED
15.30 16:00 050 CASING P 13,189.00 PROD2
RIG SERVICE
- SERVICE TOP DRIVE AND RIG FLOOR
EQUIPMENT
16:00 0000 8.00 CASING P 13,189 00 PROD2
RUN 4.5", 12.6#, L-80,SLOTTED DWC LINER TO
6001' MD
USE BEST OF LIFE 2000 PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT-LBS
-RUN 1 FLOATING CENTRALIZERS ON EVERY
OTHER JOINT
PU 99 KLBS, SO 78 KLBS AT 6001' MD
10/25/2019 0000 0030 0.50 CASING P 13,189.00 PROD2
CONTINUE TO RUN 4.5", 12.6#, L-80,SLOTTED
DWC LINER FROM 6001' MD TO 6287' MD
USE BEST OF LIFE 2000 PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT-LBS
-RUN 1 FLOATING CENTRALIZERS ON EVERY
OTHER JOINT
Printed 12/17/2019 11 21 21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 30 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DWO019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
00:30 - 01:30 1.00
CASING P 13,189.00
PROD2
MAKE UP BILLET, GS SPEAR, BUMPER SUB
AND CIRC SUB PER NORTHERN SOLUTIONS
REPRESENTATIVE
101:30 0600 4.50
CASING P 13,189.00
PROD2
RUN IN THE HOLE WITH 4.5" SLOTTED LINER
ON 4" DRILL PIPE PER TALLY
FILL ON THE FLY WITH FILL UP HOSE
PICK UP AND SLACK OFF WEIGHTS
RTAKE
EVERY 5 STANDS
I i
MUD WEIGHT IN/OUT = 9.1 PPG
I
i
NO ISSUES RUNNING THROUGH SIDETRACK
JUNCTION OR THROUGH 12600'
TAG BOTTOM AT 13185' MD (-4' HIGH) 2X
WITH 5 KLBS.
PU 174 KLBS, SO 61 KLBS
OBSERVE BUMPER SUB OPEN AT 140 KLBS
BREAK CIRCULATION AND RELEASE SPEAR
FROM BILLET PER NORTHERN SOLUTIONS
REPRESENTATIVE
TOP OF BILLET AT 6876' MD
06:00 10 00 4.00
CASING j P 13,189.00
PROD2
PULL OUT OF THE HOLE ON ELEVATORS
WITH GS SPEAR AND BUMPER SUB FROM
6876' MD
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OUT OF THE HOLE: STATIC
PU 140 KLBS, SO 75 KLBS AT 6876' MD
MUD WEIGHT IN/OUT = 9.1 PPG
10:00 11:00 1.00
BOPSUR P 13,189.00
PROD3
PERFORM WEEKLY BOP FUNCTION TEST
AND CHANGE WEAR RING TO 7" ID
11:00 13:00 2.00
DRILL P 6,876.00
PROD3
PICK UPAND MAKE UP BHA#5, 6-3/4" PROD3
DRILLING ASSEMBLY PER BAKER DD/MWD
TO TOTAL LENGTH OF 157' MD
HYCALOG TKC56 PDC BIT, AUTOTRAK
EXACT, MWD/LWD
_
113:00 - 15:30 2.50
—
DRILL P 6,876.00
PROD3
RUN IN THE HOLE WITH PROD3 DRILLING
BHA FROM 157' MD TO 4414' MD
SHALLOW HOLE TEST THE DIRECTIONAL
TOOLS AT 500' MD
FILL PIPE EVERY 2000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
-
1- PU 83 KLBS, SO 79 KLBS AT 4414' MD
15:30 16:30 1.00
DRILL P 6,87600
PROD3
SLIP AND CUT 60' OF DRILL LINE
_
RECALIBRATE BLOCKS
16.30 18:00 1 50
DRILL P 6,876.00
PROD3
CONTINUE TO RUN IN THE HOLE WITH
PROD3 DRILLING BHA FROM 4414' MD TO TOP
OF BILLET AT 6876' MD
MUD WEIGHT IN/OUT = 9.1 PPG
PU 127 KLBS, SO 85 KLBS AT 6820' MD
TAG TOP OF BILLET AT 6876' MD 5 KLBS -
18 00 0000 6.00
STKOH P 6,876.00
PROD3
PERFORM OPEN HOLE SIDETRACK AT 6856'
MD PER BAKER DO
OBTAIN SURVEYS AT 6820' MD AND 6850' MD
TROUGH UP TO 30', STAGING UP FROM 3'
TO 30' PER BAKER PROCEDURE
300 GPM, 1257 PSI
120 RPM, 7 KFT-LBS TORQUE
PU 127 KLBS, SO 85 KLBS, ROT 99 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
Printed 12/17/2019 11 21 21 AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 31 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
10/26/2019 00:00 - 12:00 12.00
STKOH P
6,876.00 PROD3
PERFORM OPENHOLE SIDETRACK PER
12:00 - 00:00 12.00 DRILL P
10/27/2019 0000 - 0600 6.00 DRILL P
BAKER DD FROM 6856' MD TO 6876' MD
TIME DRILL PER BAKER PROCEDURE
300 GPM, 1267 PSI
_ - 1_00 RPM, 7 KFT-LBS TORQUE
7,637.00 PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 6876' MD TO 7637' MD
761 FT IN 12 HRS: 63.4 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1465 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 149 KLBS, SO 78 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
600 UNITS, MAX AT 1323 UNITS
DRILL TO 6940' MD, PULLBACK UP ABOVE
SIDETRACK DEPTH OF 6871' MD AND RUN
BACK THROUGH WITH NO ISSUES
GASWATCH BACKGROUND GAS INCREASED
AT 7300' MD
- PUMP 35 BBL HIGH VIS SWEEP AT 7259' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 7549' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
8,160.00 PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 7637' MD TO 8160' MD
- 523 FT IN 6 HRS: 87.2 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1575 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 157 KLBS, SO 72 KLBS, ROT 98 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
600 UNITS, MAX AT 1110 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 7861' MD,
50% INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11.21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 32 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
- - - -, (hr) (usft )
06:00 - 12:00 6.00 DRILL P 8,605.00
PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 8160' MD TO 8605' MD
- 445 FT IN 6 HRS: 74.2 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1575 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
I
TORQUE OFF, UP TO 8 KLBS WOB
PU 160 KLBS, SO 70 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 100 TO
400 UNITS, MAX AT 1156 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 8133' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8402' MD,
75% INCREASE IN CUTTINGS BACK AT
SHAKERS
12:00 - 17:00 5.00 DRILL P
9,000.00
PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 8605' MD TO 9000' MD
395 FT IN 5 HRS: 79.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1620 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 162 KLBS, SO 73 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 43 TO
140 UNITS, MAX AT 281 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 8705' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8970' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
17:00 1800 1.00 DRILL P 9,000.00
PROD3 PULL OUT OF THE HOLE FROM 9000' MD TO
8400' MD TO REPOSITION HWDP IN STRING
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING: STATIC
PU 163 KLBS, SO 74 KLBS AT 9000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
TIGHT HOLE: PULL 30 KLBS OVER FROM 8520'
MD TO 8485' MD
BACKREAM FROM 8485' MD TO 8400' MD
320 GPM, 1630 PSI, 50 RPM, 9-12 KFT-LBS
TORQUE
18:00 19.00 1.00 DRILL P 9,000.00
PROD3 RUN IN THE HOLE ON ELEVATORS FROM
8400' MD TO 9000' MD
PU 156 KLBS, SO 74 KLBS AT 8400' MD
Printed 12/17/2019 11 21.21 AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 33 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Site: S — — -
Project: PBU --
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usft)
119:00 00:00 5.00 DRILL P 9,514.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 9000' MD TO 9514' MD
514 FT IN 5 HRS: 102.8 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1783 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 164 KLBS, SO 76 KLBS, ROT 103KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
300 UNITS, MAX AT 888 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 9322' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
10/28/2019 00:00 06:00 6.00 DRILL P 10,000.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 9514' MD TO 1 0000'MD
- 486 FT IN 6 HRS: 81.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1895 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 169 KLBS, SO 69 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 65 TO
365 UNITS, MAX AT 2290 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 9618' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9914' MD,
50% INCREASE IN CUTTINGS BACK AT
SHAKERS
06:00 12 00 600 DRILL P 10,462.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 10000' MD TO 10462' MD
- 462 FT IN 6 HRS: 77.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1872 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 167 KLBS, SO 67 KLBS, ROT 106 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 110
UNITS, MAX AT 111 UNITS
PUMP 35 BBL HIGH VIS SWEEP AT 10282'
MD, 75% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 34 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task
Code NPT Total Depth Phase
Description of Operations
(hr) _
(usft)
12:00 00:00 12.00 DRILL
P
11,506.00
PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
F
FROM 10462' MD TO 11 506'MD
- 1044 FT IN 12 HRS: 87.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1878 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 178 KLBS, SO 61 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
410 UNITS, MAXAT720 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 10576'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10844' MD, 25% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEPAT 11125' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11409' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
10/29/2019 00.00 06.00 6.00 DRILL P
12,000.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 11506' MD TO 12000' MD
- 494 FT IN 6 HRS: 82.3 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1950 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 161 KLBS, SO 63 KLBS, ROT 105 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 58 TO
341 UNITS, MAX AT 810 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11723' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11975' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
Printed 12/17/2019 11.21.21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 35 of 55
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BP OL
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To i Hrs Task Code NPT Total Depth
Phase Description of Operations
- (hr) -- (usft)-
06:00 13:30 1
7.50 DRILL P 12,641.00
PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 12000' MD TO 12641' MD
641 FT IN 7.5 HRS: 85.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1940 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 164 KLBS, SO 58 KLBS, ROT 105 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 38 TO
315 UNITS, MAX AT 415 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12362' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
13 30 1500 1.50 DRILL P 12,641.00
PROD3 DOWNLINK RIBS OFF AND CIRCULATE HOLE
CLEAN AT TD WITH A 40 BBL HI -VIS SWEEP
SURFACE TO SURFACE
320 GPM, 2044 PSI, 140 RPM, 12.5 KFT-LBS
TORQUE
MUD WEIGHT IN/OUT = 9.1 PPG
50% INCREASE IN CUTTINGS BACKAT
SHAKERS WITH SWEEP AT SURFACE
MONITOR WELL FOR 10 MIN: STATIC
1500 21'00 6.00 DRILL P 12,641.00
PROD3 PLANNED WIPER TRIP: PULL OUT OF THE
HOLE FROM 12641' MD TO ABOVE THE 7-5/8"
SHOE
MONITOR WELL FOR 10 MINUTES: STATIC
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
TIGHT HOLE AT 11600' MD WITH UP TO 20
KLBS OVERPULL
BACKREAM FROM 11600' MD TO 10700' MD
AS NEEDED
CONTINUE TO PULL ON ELEVATORS FROM
_
10700' MD
�'
21 00 22.00 1.00 DRILL P 12,641.00
PROD3 CIRCULATE THE HOLE CLEAN AT THE 7-5/8"
SHOE WITH 1X BOTTOMS UP
320 GPM, 1412 PSI
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 10 MINUTES: STATIC
2200 00'00 2.00 DRILL P 12,641.00
PROD3 ~PLANNED WIPER TRIP: RUN IN THE HOLE
WITH 6-3/4" DRILLING BHA FROM 6740' MD TO
11126' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
NO ISSUES RUNNING IN THE HOLE
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Page 36 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT i Total Depth Phase
Description of Operations
(hr)_ (us_ft)
10/30/2019 00:00 01:00 1.00 DRILL P 12,641.00 PROD3
PLANNED WIPER TRIP: CONTINUE TO RUN IN
THE HOLE WITH 6 3/4" DRILLING BHA FROM
111 26'MD TO 12641' MD
- FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
01:00 03:30 2.50 DRILL P 12,641.00 PROD3
CIRCULATE HOLE CLEAN AT TD PRIOR TO
PULLING OUT OF THE HOLE
CIRCULATE 2X BOTTOMS UP
320 GPM, 1991 PSI, 120 RPM, 11 KFT-LBS
TORQUE
MUD WEIGHT IN/OUT = 9.1 PPG
SPOT 4% LUBE PILL IN OPEN HOLE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
SIGNIFICANT INCREASE IN CUTTINGS PRIOR
TO FIRST BOTTOMS UP. HOLE CLEANED UP
_
AFTER 1.5X BOTTOMS UP STROKES
0330 10.30 7.00 DRILL P 12,641.00 PROD3
PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" DRILLING BHA FROM 12641' MD
TO TOP OF B HA AT 156' MD
MONITOR WELL FOR 10 MINUTES PRIOR TO
PULLING OFF BOTTOM AND AT 7-5/8" SHOE:
STATIC
PU 185 KLBS, SO 61 KLBS AT 12641' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
NO HOLE ISSUES WHILE PULLING
DROP 2.4" OD DRIFT ON STAND #69 FOR
UPCOMING LINER RUN
10 30 13 00 2.50 DRILL P 12,641.00
PROD3
LAY DOWN 6-3/4" DRILLING BHA PER BAKER
DD/MWD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING BHATHROUGH STACK STATIC
REMOVE SOURCES
LAY DOWN WORN AND DAMAGED BHA
COMPONENTS
DULL BIT GRADE: 1 - 2 - BT - H - X - I - NO -
TD
1300 - 1330 050 CASING P 12,641.00 PROD3
RIG UP TO RUN 4-1/2" SLOTTED LINER
RIG UP DOYON CASING TONGS
VERIFY PIPE COUNT IN PIPE SHED
Printed 12/17/2019 11 21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 37 of 55
Common Well Name: S-202
21:30
1.00
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date. 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:0O:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Alive datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft)
13:30 - 20:30
1 7.00
CASING P
12,641.00 PROD3
RUN 4.5", 12.6#, L-80 SLOTTED LINER TO 5784'
20:30
21:30
1.00
CASING
21:30
00:00
2.50
CASING
P
P
10/31/2019 00:00 - 01:00 1.00 CASING
01:00 - 0200 1.00 CASING P
MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
RUN 4.5", 12.6#, L-80 VAMTOP SOLID LINER
FROM 5784' MD TO 6523' MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 4440 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
RUN A TOTAL OF 79 CENTRALIZERS AND 80
_ _STOP RINGS _
12,641.00 PROD3 MAKE UP BAKER SEAL BORE EXTENSION,
LINER HANGER AND LINER TOP PACKER
ASSEMBLY TO 6581' MD PER BAKER LINER
HANGER REPRESENTATIVE -
12,641.00 PROD3 CONTINUE TO RUN IN THE HOLE WITH 4.5"
SLOTTED/SOLID LINER ON 4"
DRILL PIPE PER TALLY FROM 6581' MD TO
11430' MD
RUN IN THE HOLE AT 90 FPM
PU 146 KLBS, SO 84 KLBS AT 11430' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- MUD WEIGHT IN/OUT = 9.1 PPG
CIRCULATE 25 BBLS (SOLID CASING VOLUME
PLUS 5 BBLS) AT THE 7-5/8" CASING SHOE
4 BPM, 165 PSI
12,641.00 PROD3 CONTINUE TO RUN IN THE HOLE WITH 4.5"
SLOTTED/SOLID LINER ON 4"
DRILL PIPE PER TALLY FROM 11430' MD TO
12641' MD
RUN IN THE HOLE AT 90 FPM
PU 155 KLBS, SO 81 KLBS AT 12641' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- MUD WEIGHT IN/OUT = 9.1 PPG
12,641 00 PROD3 DROP SETTING BALLAND SET LINER
HANGER / LINER TOP PACKER PER BAKER
LINER HANGER REPRESENTATIVE
- PRESSURE UP TO 2080 PSI AND SET LINER
HANGER
- SLACK OFF 100 KLBS AND CONTINUE TO
PRESSURE UP TO 4200 PSI TO SET LINER
TOP PACKER
- PICK UP AND SLACK OFF, OBSERVE DOG
SUB SHEAR WITH 70 KLBS, SET DOWN 90
KLBS
- PICK UP AND ROTATE AT 20 RPM, 2.5-5.5
KFT-LBS TORQUE, SET DOWN ON LINER 2X
WITH 70 KLBS TO VERIFY PACKER SET
- PULL RUNNING TOOL CLEAR OF LINER
HANGER / LINER TOP PACKER
Printed 12/17/2019 11:21.21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 38 of 55
Common Well Name: S-202
6060 MD
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
Project. PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
PROPER FILL
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
RIG UP TO TEST BOP
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
_ (hr)
6,060.00 PROD3
(usft)
02:00 - 04:30 2.50
CASING P
6,06000 PROD3
PULL OUT OF THE HOLE AND LAY DOWN
TEST WITH 4" AND 4-1/2" TEST JOINTS
LINER RUNNING TOOL FROM LINER TOP AT
Printed 12/17/2019 11:21 21 AM "All depths reported in Drillers Depths"
6060 MD
- MONITOR WELL FOR 10 MIN: STATIC
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
04:30 - 05:30 1.00 BOPSUR P
6,060.00 PROD3
RIG UP TO TEST BOP
MAKE UP TEST JOINT AND TEST MANIFOLD
PULL WEAR RING AND INSTALL TEST PLUG
FILL LINES AND PURGE AIR FROM SYSTEM
05:30 13:30 8.00 BOPSUR P
6,060.00 PROD3
TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
TEST WITH 4" AND 4-1/2" TEST JOINTS
ALL TESTS CHARTED
TEST WITNESS WAIVED BYAOGCC REP
GUY COOK
ONE FAIL PASS: UPPER IBOP FAILED TO
TEST.
CHANGE OUT UPPER IBOP AND RE -TEST
250/3500 FOR 5 CHARTED MIN EACH: GOOD
I
'TEST
i
PULL TEST PLUG AND RE -INSTALL 7" ID
WEAR RING
13:30 14:00 0.50 BOPSUR P
6,060.00 PROD3
RIG DOWN TEST EQUIPMENT
14:00 18:00 4.00 STWHIP P
6,060.00 PROD3
MAKE UP WHIPSTOCKAND MILLING
ASSEMBLY PER BAKER FISHING
REPRESENTATIVE TO 498' MD
18 00 21:00 3.00 STWHIP P
6,060.00 PROD3
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
498' MD TO 6063' MD
FILL PIPE EVERY 2000' MD
SHALLOW HOLE TEST TOOLS AT 90' MD: 275
GPM, 950 PSI
- MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
PU 114 KLBS, SO 94 KLBS AT 6000' MD
21:00 22:30 1.50 STWHIP P
6,060.00 PROD3
ORIENT AND SET BAKER WHIPSTOCK PER
BAKER FISHING REP
ORIENT WHIPSTOCK TO 340° (20'LOHS)
WASH DOWN 250 GPM AND TAG TOP OF
LINER AT 6063' MD
SET WHIPSTOCK PER BAKER FISHING REP:
SET DOWN 10 KLBS TO SHEAR ANCHOR
PICK UP 10 KLBS OVER TO VERIFY ANCHOR
SET
- SLACK OFF AND OBSERVE MILLS SHEAR
FROM SLIDE WITH 35 KLBS
TOW 6007' MD
BOW 6020' MD
Printed 12/17/2019 11:21 21 AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 39 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Daterrime: 9/30/2019 11:00:0013M
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
22:30 00:00 1.50 STWHIP P 6,060.00 PROD3
MILL WINDOW PER BAKER FISHING REP
FROM 6007' MD TO 6008' MD
250 GPM, 1260 PSI
80 RPM, 5-7 KFT-LBS TORQUE, ROT WEIGHT
104 KLBS
l - MUD WEIGHT IN/OUT_= 9.1 PPG
11/1/2019 00 00 10 00 1000 STWHIP P 6,041 00 PROD4
MILL WINDOW PER BAKER FISHING REP
FROM 6008' MD TO 6041' MD
250 GPM, 1260 PSI
80-100 RPM, 5-10 KFT-LBS TORQUE
PU 131 KLBS, SO 91 KLBS, ROT 102 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
TOP OF WINDOW: 6007' MD
BOTTOM OF WINDOW: 6020' MD
MILLTO 6041' MD, UPPER GAUGE MILL 3'
INTO FORMATION.
DRIFT MILLS THROUGH WINDOW BOTH WITH
AND WITHOUT PUMPS SEVERAL TIMES TO
CONFIRM CLEAN.
10:00 10:30 0.50 STWHIP P 6,041.00 PROD4
CIRCULATE HOLE CLEAN
PUMP 25 BBL HIGH VIS SWEEP SURFACE
TO SURFACE
350 GPM, 1850 PSI
100 RPM, 6 KFT-LBS TORQUE
10:30 13.30 3.00 STWHIP P 6,041.00 PROD4
PULL OUT OF THE HOLE ON ELEVATORS
WITH WINDOW MILLING ASSEMBLY FROM
6007' MD TO 372' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
PU 131 KLBS, SO 91 KLBS AT 6007' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
HOLD KICK WHILE TRIPPING DRILLAND AAR
WITH WOODS' CREW: CRT 1 MIN 42 SEC
13.30 15.00 1.50 STWHIP P 6,041.00 PROD4
PULL AND LAY DOWN MILLING ASSEMBLY
PER BAKER FISHING REPRESENTATIVE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BHA THROUGH STACK: STATIC
STAND BACK 4" HWDP
LAY DOWN MWD AND MILLS PER BAKER
PILOT MILL: 1/8" UNDER GAUGE
UPPER MILL: IN GAUGE
FLUSH STACK AND CLEAN AND CLEAR RIG
--
FLOOR -- —
15:00 16:30 1.50 DRILL P 6,041.00 PROD4
MAKE UP AND RUN IN THE HOLE WITH BHA
#7, 6-3/4", 1.8° AKO MOTOR ASSEMBLY TO
173' MD
ADJUST MOTOR BEND TO 1.8°
MAKE UP 6-3/4" HUGHES MILL TOOTH BIT,
MOTOR, STABILIZER, NAVIGAMMA, PULSER
AND FLEX COLLARS
Printed 12/17/2019 11.2121AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 40 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
1630 2000 3.50 DRILL P 6,041.00 PROD4
RUN IN THE HOLE WITH 6-3/4" MOTOR
ASSEMBLY FROM 173' MD TO 5946' MD
SHALLOW HOLE TEST TOOLS AT 1100' MD:
GOOD
FILL PIPE EVERY 2000' MD
PU 130 KLBS, SO 84 KLBS AT 5946' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
20:00 00 00 4.00 DRILL P 6,167.00 PROD4
ORIENT BIT HIGH -SIDE AND RUN THROUGH
WINDOW
- NO DRAG OBSERVED GOING THROUGH
WINDOW
DIRECTIONALLY DRILL 6-3/4" OBa PROD4
LATERAL BUILD SECTION FROM 6041' MD TO
6167' MD, 5205' TVD
126 FT IN 4 HRS: 31.5 FT/HR ROP WITH
CONNECTIONS
275 GPM, 1230 PSI ON/OFF BOTTOM
8 KLBS WOB
PU 136 KLBS, SO 87 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
11/2/2019
00:00 04:30
4.50 DRILL P
6,329.00
PROD4
DIRECTIONALLY DRILL 6-3/4" OBa PROD4
LATERAL BUILD SECTION FROM 6167' MD TO
6329' MD, 5158' TVD
162 FT IN 4.5 HRS: 36.0 FT/HR ROP WITH
CONNECTIONS
275 GPM, 1320 PSI ON/OFF BOTTOM
45 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, 8-15 KLBS WOB
PU 133 KLBS, SO 86 KLBS, ROT 103 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 17 TO
157 UNITS, MAXAT 302 UNITS
04.30 05 30 1.00 DRILL
P 6,329.00 PROD4
CIRCULATE HOLE CLEAN, PUMP 35 BBL HIGH
VIS SWEEP SURFACE TO SURFACE
350 GPM, 1800 PSI
50 RPM, 6-7 KF_T-LBS TORQUE _
05 30 09.00 3.50 DRILL P 6,329 00 PROD4
PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" MOTOR ASSEMBLY FROM 6329'
MD TO TOP OF THE BHAAT 173' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
PU 133 KLBS, SO 86 KLBS AT 6329' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILL AND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
2-4 KLBS ADDITIONAL DRAG NOTED WHILE
PULLING BHA THROUGH HIGH DOGLEG
SECTION OF THE BUILD
Printed 12/17/2019 112121AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 41 of 55
Common Well Name: 5-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-D1-DN- (16,199,881,00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft) _
09:00 09:30 0.50 DRILL P 6,329.00 PROD4 PULL AND LAY DOWN 6-3/4" MOTOR
Printed 12/17/2019 11:21 21 AM **All depths reported in Drillers Depths**
ASSEMBLY PER BAKER DD / MWD FROM 173'
MD
MONITOR THE WELL FOR 10 MIN: STATIC
PU 52 KBLS, SO 52 KLBS AT 172' MD
LAY DOWN MOTOR, STABILIZER,
NAVIGAMMA, PULSER AND FLEX COLLARS
DULL BIT GRADE: 1 -I -WT -A -E -I -NO-
--
—— BHA -
09:30 10:00 0.50 DRILL P 6,329.00
PROD4 CLEAN AND CLEAR RIG FLOOR
MOBILIZE TOOLS FOR 6-3/4" DRILLING
ASSEMBLY TO RIG FLOOR
10:00 13:30 3.50 DRILL P 6,329.00
PROD4 j PICK UP AND MAKE UP BHA #5,6-3/4" PROD3
DRILLING ASSEMBLY PER BAKER DD / MWD
TO TOTAL LENGTH OF 156' MD
- SMITH X516 PDC BIT, AUTOTRAK EXACT,
MWD/LWD
PLUG IN AND VERIFY COMMUNICATION
LOAD SOURCES
PU 42 KLBS, SO 43 KLBS AT 153' MD
1330 1630 3.00 DRILL P 6,329.00
PROD4 RUN IN THE HOLE WITH PROD4 DRILLING
BHA FROM 156' MD TO 6024' MD
SHALLOW HOLE TEST DD / MWD AT 1000'
MD
FILL PIPE EVERY 2000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
PU 127 KLBS, SO 87 KLBS AT 602_4' MD
1630 20:00 3.50 DRILL P 6,32900
PRO04 OBTAIN CALIPER READINGS AND LOG FROM
6030' MD TO 6329' MD PER BAKER MWD
- TAKE VERIFICATION SURVEYS AT 6239' MD,
6270' MD AND 6301' MD
20 00 00:00 4.00 DRILL P 6,561.00
PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6329' MD TO 6561' MD
232 FT IN 4 HRS: 58.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1500 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 143 KLBS, SO 83 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 64 TO
158 UNITS, MAX AT 489 UNITS
Printed 12/17/2019 11:21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 42 of 55
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
_ (hr) _f'
_ (usft)
11/3/2019 00:00 05:00 6.00 DRILL P
6,930.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6561' MD TO 6930' MD
- 369 FT IN 7 HRS (END DAYLIGHT SAVINGS):
52.7 FT/HR ROP WITH CONNECTIONS
- 320 GPM, 1535 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 140 KLBS, SO 81 KLBS, ROT 99 KLBS
SURVEY EVERY 30' FOR DLS > 5°, EVERY 90'
FOR DLS < 5° AS REQUIRED
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 278
UNITS, MAX AT 560 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 6593' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT6890' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
06:00 12:00 6.00 DRILL P 7,352.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6930' MD TO 7352' MD
422 FT IN 6 HRS: 70.3 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 143 KLBS, SO 82 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 310
UNITS, MAX AT 1057 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7186' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
12.00 00:00 12.00 DRILL P 8,143.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 7352' MD TO 8143' MD
- 791 FT IN 12 HRS: 65.9 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 140 KLBS, SO 82 KLBS, ROT 99 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 230 TO
600 UNITS, MAX AT 1245 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7446' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7728' MD, 100% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8015' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11:21:21AM "All depths reported in Drillers Depths"
North America - ALASKA - BP Page 43 of 55
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
11/4/2019 00:00 06:00 6.00 DRILL P 8,500.00 PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 8143' MD TO 8500' MD
357 FT IN 6 HRS: 59.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1690 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 145 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 650
UNITS, MAX AT 938 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8310' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
06:00 13:30 7.50 DRILL P 91058.00 PROD4 1 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 8500' MD TO 9058' MD
558 FT IN 7.5 HRS: 74.4 FT/HR ROP WITH
'CONNECTIONS
320 GPM, 1648 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
- PU 148 KLBS, SO 73 KLBS, ROT 99 KLBS
SURVEY EVERY 90'
i I I
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE=
450-700 UNITS, MAX AT 1315 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8590' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8792' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8970' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
13:30 14:30 1.00 DRILL P 9,058.00 PROD4 PULL OUT OF THE HOLE FROM 9058' MD TO
8396' MD TO POSITION HWDP IN STRING
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING: STATIC
PU 150 KLBS, SO 83 KLBS AT 9058' MD
MUD WEIGHT IN/OUT = 9.1 PPG
14:30 15:30 1.00 DRILL P 9,058.00 PROD4 RUN IN THE HOLE ON ELEVATORS FROM
8396' MD TO 9058' MD
- PU 156 KLBS, SO 89 KLBS AT 9058' MD
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 44 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
hr )
15:30 00:00 8.50 DRILL P 9,702.00 PROD4
DIRECTIONAL DRILL 6-3/4" PRO64 HOLE
FROM 9058' MD TO 9702' MD
644 FT IN 8.5 HRS: 75.8 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1821 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 162 KLBS, SO 77 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
- GASWATCH BACKGROUND RANGE _
390-840 UNITS, MAX AT 1363 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9234' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9515' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
11/5/2019 00 00 0600 6.00 DRILL P 9,702.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 9702' MD TO 10200' MD
- 498 FT IN 6 HRS: 83.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1822 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 154 KLBS, SO 74 KLBS, ROT 102 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
390-840 UNITS, MAX AT 1363 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9803' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10098' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
06.00 1200 6.00 DRILL P 10,557.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 10200' MD TO 10557' MD
- 357 FT IN 6 HRS: 59.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1800 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 8.5
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 160 KLBS, SO 75 KLBS, ROT 105 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
500-1100 UNITS, MAX AT 2060 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10370' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths*'
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths'"
North America - ALASKA - BP
Page 45 of 55
Operation Summary Report
Common Well Name: S-202
—
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
12:00 00:00 12.00
DRILL P 11,366.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 10557' MO TO 11 366'MD
809 FT IN 12 HRS: 67.4 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1930 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 177 KLBS, SO 60 KLBS, ROT 103 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
- GASWATCH BACKGROUND RANGE _
300-450 UNITS, MAX AT 990 UNITS
10700' MD: 3% LEL IN AIR ALARM AT SHAKER
DECK. MADE NOTIFICATIONS PER WELL
MONITORING MATRIX. GAS DISSIPATED
QUICKLY AND LEL LEVELS DROPPED BACK
TO 0.
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10934' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11 223'MD, 50% INCREASE IN
_
CUTTINGS BACK AT SHAKERS
11/6/2019 00:00 12:00 12.00 l
DRILL P 12,325.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 11 366'MD TO 12325' MD
959 FT IN 12 HRS: 80 FT/HR ROP WITH
CONNECTIONS
320 GPM, 2000 PSI ON/OFF BOTTOM
120 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 98 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 1345 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11515' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11800' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths'"
North America - ALASKA - BP
Operation Summary Report
Page 46 of 55 1
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 i End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project. PBU Site: s
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor PARKER DRILLING CO_ I BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft) J
12:00 - 20:30 8.50 DRILL P 13,022.00 PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 12325' MD TO 13022' MD
697 FT IN 8.5 HRS: 82 FT/HR ROP WITH
CONNECTIONS
320 GPM, 2050 PSI ON/OFF BOTTOM
120 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 180 KLBS, SO 81 KLBS, ROT 103 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 400
UNITS, MAX AT 730 UNITS
INCREASE LUBE CONCENTRATION TO 3%
DUE TO AN INCREASE IN TORQUE AND DRAG
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12363' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12644' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 13022' MD, 10% INCREASE IN
CUTTINGS BACKAT SHAKERS
2030 22:30 2 00 DRILL P 13,022.00 PROD4 CIRCULATE HOLE CLEAN WITH 2X BOTTOMS
IUP
350 GPM, 2250 PSI
140 RPM, 10 KFT-LBS TORQUE
RECIPROCATE FULL STAND
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 10% INCREASE IN CUTTINGS
BACK AT SHAKERS
22:30 00:00 1.50 DRILL P 13,022.00 PROD4 jPULL OUT OF THE HOLE FROM 13022' MD TO
10600' MD
MONITOR WELL FOR 10 MIN (STATIC)
OBSERVE -30 KLBS DRAG AT 10600' MD_
11/7/2019 00.00 0330 3.50 DRILL P 13,022.00PROD4 PULL OUT OF THE HOLE FROM 10600' MD TO
THE TOP OF THE WINDOW AT 6007' MD
- BACKREAM 1 STAND FROM 10567' MD TO
10477' MD, 320 GPM, 120 RPM, 900 FPH
- OBSERVE 30-40 KLBS OVERPULLAT -6190'
MD AND 6135' MD
- MONITOR THE WELL FOR 10 MIN AT THE
WINDOW (STATIC)
03:30 0430 1.00 DRILL P 13,022.00 PROD4 CIRCULATE BOTTOMS UP
350 GPM, 1550 PSI
80 RPM, 3 KFT-LBS TORQUE
_ NO CUTTINGS OBSERVED AT SHAKERS
04:30 11:00 6 50 DRILL P 13,022.00 PROD4 RUN IN THE HOLE TO BOTTOM AT 13022' MD
- OBSERVE DRAG FROM 10275' MD TO 10620'
MD
BACKREAM FROM 10620MD TO 10275' MD,
350 GPM, 140 RPM, 600 FPH
Printed 12/17/2019 11 21 21 AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 47 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU -
Site: S — - —
—
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019
11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
1 Total Depth
Phase
Description of Operations
(hr) -
--
(usft)
_
11.00 1400 3.00
DRILL P
13,022.00
PROD4
CIRCULATE HOLE CLEAN WITH 3X BOTTOMS
UP
350 GPM, 2400 PSI
140 RPM, 7 KFT-LBS TORQUE
OBSERVE SIGNIFICANT INCREASE IN
CUTTINGS BACK AT SHAKERS AT FIRST
BOTTOMS UP
CIRCULATE HIGH VIS / LOW VIS SWEEP
SUFACE TO SURFACE, NO INCREASE IN
CUTTINGS BACK AT SHAKERS
SPOT 280 BBL 4% LUBE PILL IN OPEN HOLE
_
i- MONITOR WELL FOR 10 MIN (STATIC)
14:00 20:00 6.00
DRILL P
13,022.00RP
OD4
PULL OUT OF THE HOLE FROM TD AT 13022'
MD TO THE TOP OF THE BHA AT 157' MD
MONITOR WELL FOR 10 MIN AT THE
WINDOW AND AT THE TOP OF THE BHA
(STATIC)
OBSERVE 10-20 KLBS AT 6210' MD AND 6135'
_
MD
2000 2130 1 50
DRILL P
13,022.00
PROD4
LAY DOWN BHA FROM 157' MD TO SURFACE
- BIT GRADE: 1 -1 -IN GAUGE
21:30 2200 0.50
DRILL P
13,022.00
PROD4
CLEAN AND CLEAR RIG FLOOR
_
_
�- PERFORM WEEKLY BOPE FUNCTION TEST
2200 2300 1.00
CASING P
13,022.00
PROD4
i MAKE UP WHIPSTOCK RETRIEVAL ASSEMBLY
WITH BAKER MWD TO 373' MD
23.00 0000 1.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP TO 1320' MD
11/8/2019 00 00 02:00 2.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP FROM 1320'
1_
IMDTO51001MID
02.00 03.00 1.00
CASING P
13,022.00
PROD4
CUTAND SLIP DRILL LINE
RECALIBRATE BLOCK HEIGHT IN AMPHION
— — -
—
SYSTEM
03.00 04.00 1.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE FROM 5100' MD TO THE
TOP OF THE WHIPSTOCK AT 6007' MD
I - CLEAN OUT WHIP STOCK RETRIEVAL SLOT
WITH 350 GPM, 1350 PSI
ORIENT HOOK
ENGAGE WHIPSTOCK, SHEAR ANCHOR AND
UNSEAT WHIPSTOCK WITH 75 KLBS
OVERPULL
0400 04.30 0.50
CASING P
13,022.00
PROD4
CIRCULATE BOTTOMS UP
350 GPM, 1350 PSI
DROP 2-3/8" DRIFT
MONITOR WELL FOR 10 MIN (STATIC) -
04:30 11:00 6.50
CASING P
13,022.00
PROD4
PULL OUT OF THE HOLE WITH WHIPSTOCK
FROM 6007' MD TO SURFACE
LAY DOWN WHIPSTOCKAND RETRIEVAL
ASSEMBLY
NOTE DIRECTION WHIPSTOCK CAME OUT
I OF THE HOLE -
1100 12:00 1.00
CASING P
13,022 00
PROD4
RIG UP TO RUN 4-1/2" SLOTTED LINER
DOUBLE STACK TONGS, AIR SLIPS AND
--
ELEVATORS
Printed 12/17/2019 11 21:21 AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 48 of 55
Common Well Name: S-202
AFE No
Event Type: Di ONSHORE (DON) Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU Site: S — -
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
1BPUO1:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase
Description of Operations
- (hr) i -- (usft)-
12.00 21:30 9.50 CASING f P 13,022.00
PROD4
'RUN 4.5'.12.6#, L-80 SLOTTED LINER TO
i
TOTAL LENGTH OF 6960 ' MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
ORIENT BENT JOINT TO THE DIRECTION
I THE WHIPSTOCK CAME OUT OF THE HOLE,
NO ISSUES ENTERING LATERAL WITH BENT
JOINT
MAKE UP HOOK HANGER ASSEMBLY WITH
_
INNER STRINGAND SLIMH_OLE MWD
21:30 00:00
2.50 CASING P
13,022.00
PROD4
i CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 6960' MD TO
11808' MD
_ —
RIH AT 90 FPM PER BAKER REP
11/9/2019 00:00 00:30 0.50 CASING P 13,022.00 PROD4
CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 11808' MD
TO PLANNED SET DEPTH AT 12961' MD
I
RIH AT 90 FPM PER BAKER REP
FINAL PU 140 KLBS, SO 75 KLBS
00:30 04:00 3.50 CASING P
13,022.00 PROD4
SET HOOK HANGER AND RELEASE
ORIENT HOOK HANGER TO 22° LOHS
120 GPM, 650 PSI
TAG BOTTOM OF WINDOW WITH HOOK
I
HANGER ON DEPTH, SET DOWN 15 KLBS
PICK UP AND ORIENT 158° ROHS, RIH PAST
BOTTOM OF WINDOW WITH HOOK HANGER
^3'
PICK UP AND ORIENT 22° LOHS, RIH AND
LAND HOOK HANGER ON BOTTOM OF
WINDOW, SET DOWN 15 KLBS
BREAK OUT OF STRING AND DROP BALL
PUMP BALL DOWN AND PRESSURE UP TO
3300 PSI, BLEED PRESSURE AND PICK UP TO
RELEASE FROM HANGER
PU WEIGHT REDUCED 20 KLBS AFTER
RELEASING FROM LINER
PRESSURE UP TO 4300 PSI TO SHEAR OUT
BALL SEAT
- TOP OF LINER AT 6001' MD, SHOE AT 12961'
MID
04:00 08:00 4.00 CASING P 13,022.00 PROD4
'PULL OUT OF THE HOLE FROM THE LINER
TOP AT 6001' MD AND LAY DOWN LINER
I RUNNING TOOL AND MWD
08:00 10:00 2.00 CASING P 13,022.00 PROD4
MAKE UP LEM ASSEMBLY TO TOTAL LENGTH
OF 220' MD
10:00 14:00 4.00 CASING P 13,022.00
PROD4
RUN IN THE HOLE WITH LEM ASSEMBLY ON
4" DP FROM 220' MD TO SET DEPTH AT 6108'
MD
SHALLOW HOLE TEST MWD AT 310' MD
ORIENT LEM PRIOR TO ENTERING HOOK
(HANGER
- LEM SEALASSEMBLY 16' INSIDE SEALBORE
EXTENSION ON LINER #3
14:00 16:00 2.00 CASING P 13,022.00 PROD4
DROP BALL, SET AND RELEASE FROM LINER
(HANGER
SET LINER TOP PACKER
LINER TOP AT 5902' MD
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 49 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs Task
Code
NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
16:00 20:00
4.00 CASING P
13,022.00
PROD4
PULL OUT OF THE HOLE FROM 5902' MD TO
SURFACE
�-
—
LAY DOWN RUNNING TOOLS AND MWD
20:00 22:30
2.50 CASING P
13,022.00
PROD4
MAKE UP WHIPSTOCKAND MILLASSEMBLY
TO 428' MD
22:30 00:00
1.50 T CASING
P
13,022.00
PROI
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
428' MD TO 3171' MD
- FILL PIPE EVERY 2000' MD
SHALLOW HOLE TEST TOOLS AT 900' MD:
275 GPM, 950 PSI
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
-MUD WEIGHT IN/OUT = 9.1 PPG
11/10/2019 00:00 01:30
1.50 CASING P
13,022.00
PROD4
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
3171' MD TO 5901' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
01:30 02:30
1.00
CASING P
3,022.00
PROD4
ORIENT AND SET BAKER WHIPSTOCK PER
BAKER FISHING REP
ORIENT WHIPSTOCK TO 343° (17°LOHS)
WASH DOWN 250 GPM AND TAG TOP OF
LINER
SET WHIPSTOCK PER BAKER FISHING REP:
SET DOWN 10 KLBS TO SHEAR ANCHOR
PICK UP 10 KLBS OVER TO VERIFY ANCHOR
SET
- SLACK OFF AND OBSERVE MILLS SHEAR
FROM SLIDE WITH 37 KLBS
TOW 5849' MD
BOW 5862' MD
02:30 15:00
12.50 DRILL P
5,884.00
PROD1
MILL WINDOW PER BAKER FISHING REP
FROM 5849' MD TO 5862' MD, DRILL NEW
FORMATION TO 5884' MD
325 GPM, 1650 PSI
100 RPM, 2-7 KFT-LBS TORQUE
PU 114 KLBS, SO 99 KLBS, ROT 102 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
REAM WINDOW 3X TO ESURE SMOOTH
OPENING, DRIFT WINDOW WITH NO PUMPS
OR ROTATION WITH NO ISSUES
CIRCULATE 35 BBL HIGH VIS SWEEP
SURFACE TO SURFACE, NO INCREASE IN
CUTTINGS OR METAL SHAVINGS BACK AT
SHAKERS
15:00 17:00
2.00 DRILL P
5,884.00
PROD1
PULL OUT OF THE HOLE FROM 5884' MD TO
THE TOP OF THE BHA AT 372' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM AND AT THE TOP OF
THE BHA (STATIC)
17.00 18:00
1.00 DRILL P
5,884.00
PROD1
LAY DOWN MILLING BHA FROM 372' MD TO
SURFACE
- MILLS GAUGE = PILOT MILL 3/16" OUT,
UPPER DRESS MILL IN GAUGE
Printed 12/17/2019 11:21:21AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 50 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date:
11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 .00 )
Project: PBU
Site: S --
-
—
-
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(usft) --
--
18:00 18:30
0.50
DRILL I
P
5,884.00
PROD1
CLEAN AND CLEAR RIG FLOOR
FLUSH BOP STACK
18:30 20:00
1.50
DRILL
P
5,884.00
PROD1
MAKE UP 6-3/4" MOTOR BHA TO TOTAL
LENGTH OF 174' MD
6-1/8" TRICONE BIT, MUD MOTOR WITH 1.5°
AKO, AND MWD
20:00 23:00
3.00
DRILL
P
5,884.00
PROD1
RUN IN THE HOLE ON 4" DP FROM 174' MD TO
BOTTOM AT 5884' MD
SHALLOW TEST THE MWD AT 11 00'MD
ORIENT MOTOR TO 17° LOHS PRIOR TO
ENTERING WINDOW, NO ISSUES TRIPPING
THROUGH WINDOW -
23:00 00:00
1.00
DRILL
P
5,897.00
PROD1
DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
BUILD SECTION FROM 5884' MD TO 5897' MD
275 GPM, 1200 PSI ON/OFF BOTTOM
5 KLBS WOB
PU 113 KLBS, SO 92 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
—
11/11/2019 00:00 09:30
9.50
DRILL
P
6,230.00
PROD1
DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
BUILD SECTION FROM 5897' MD TO 6230' MD
275 GPM, 1375 PSI ON/OFF BOTTOM
50 RPM, 5 KFT-LBS ON BOTTOM, 3 KFT-LBS
OFF BOTTOM, UP TO 15 KLBS WOB
PU 120 KLBS, SO 90 KLBS, ROT 100 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
- -',
MUD WEIGHT IN/OUT = 9.1 PPG
09:30 10 30
1.00
DRILL
P r
6 ,230.00
PROD1
CIRCULATE BOTTOMS UP
300 GPM, 1360 PSI
50 RPM, 4 KFT-LBS TORQUE
MONITOR WELL FOR 10 MIN (STATIC)
10.30 13 00
250
DRILL
P
6,23000
PROD1
PULL OUT OF THE HOLE FROM 6230' MD TO
THE TOP OF THE BHA AT 174' MD
MONITOR WELL FOR 10 MIN AT THE TOP OF
THE BHA (STATIC)
1300 1400
1.00
DRILL
P
6,230.00
PROD1
LAY DOWN BHA FROM 174' MD TO SURFACE
BIT GRADE: 1 -1 -IN GAUGE
14:00 15:30
1.50
DRILL
P
6,230.0
RPO O 1D
CLEAN AND CLEAR RIG FLOOR AND
PREPARE TO TEST BOPE
MAKE UP TEST JOINTS
DRAIN STACK
PULL WEAR BUSHING SET TEST PLUG
FILL STACK WITH WATERAND BLEED AIR
FROM SYSTEM
1530 20 30
5.00
DRILL
P
6,230.00
PROD1
PRESSURE TEST BOPE TO 250 PSI LOW AND
3500 PSI HIGH FOR 5 MIN EACH
- TEST WITH 4" AND 4-1/2" TEST JOINTS
NO FAILURES
TEST WITNESSED BYAOGCC REP BOB
NOBLE
20:30 21.00
0 50
DRILL
P
6,230.00
PROD1
RIG DOWN AND BLOW DOWN TESTING
EQUIPMENT
- PULL TEST PLUG AND INSTALL WEAR
BUSHING (7" ID)
Printed 12/17/2019 11 21 21AM **All depths reported in Drillers Depths**
Printed 12/17/2019 11.2121AM *`All depths reported in Drillers Depths"
North America
- ALASKA -
BP
Page 51 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
---- ---
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
- --
21:00 - 23:00 2.00
-
DRILL P
6,230.00
- -
PROD1
---- - - -
PICKUP AND MAKEUP BHA #12,6-3/4" PRODS
DRILLING ASSEMBLY PER BAKER DD / MWD
TO TOTAL LENGTH OF 158' MD
SMITH X516 PDC BIT, AUTOTRAK EXACT,
MWD/LWD
PLUG IN AND VERIFY COMMUNICATION
LOAD SOURCES
-
- PU 42 KLBS, SO 43 KLBS AT 153' MD - -
123:00 00:00 1.00
DRILL P
6,230.00
PROD1
RUN IN THE HOLE WITH ROTARY STEERABLE
ASSEMBLY FROM 158' MD TO 11 00'MD
SHALLOW TEST THE MWD AT 1100' MD, 300
GPM, 850 PSI
11/12/2019 00.00 02:00 2-00
DRILL P
6,230.00
PROD1
TRIP IN THE HOLE ON ELEVATORS FROM
1100' MD TO 5869' MD
NO ISSUES TRIPPING THROUGH WINDOW
02:00 06:00 1 4.00
DRILL P
6,230.00
PROD1
' MADD PASS FROM 5869' MD TO BOTTOM AT
6230' MD
300 GPM, 1200 PSI
OBTAIN 3 VERIFICATION SURVEYS
06:00 12:00 6.00
DRILL P
6,750.00
PROD1
DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 6230' MD TO 6750' MD
520 FT IN 6 HRS: 87 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1450 PSI ON/OFF BOTTOM
120 RPM, 6 KFT-LBS TORQUE ON, 5 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 133 KLBS, SO 84 KLBS, ROT 102 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 300
_
UNITS, MAXAT 1250 UNITS
12:00 00:00 12.00
DRILL P I
7,740.00
PROD1
DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 6750' MD TO 7740' MD
990 FT IN 12 HRS: 83 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 142 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 150
UNITS, MAX AT 828 UNITS
Printed 12/17/2019 11.2121AM *`All depths reported in Drillers Depths"
North America - ALASKA - BP Page 52 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
--(hr) -- -' -- - -(usft)
-- --
11/13/2019 00:00 12:00 12.00 DRILL P 8,778.00 PROD1
DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 7740' MD TO 8778' MD
1038 FT IN 12 HRS: 86.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1630 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 147 KLBS, SO 81 KLBS, ROT 101 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2440 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7743' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8014' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8300' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8585' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
12:00 00:00 12.00 DRILL P 9,622.00 PROD1
DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 8778' MD TO 9622' MD
- 844 FT IN 12 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1720 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 167 KLBS, SO 78 KLBS, ROT 107 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 350
UNITS, MAX AT 1060 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8870' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9134' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9419' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11:21 21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 53 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
11/14/2019 00:00 12:00
_
12.00 DRILL P 10,462.00 r PROD1
DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 9622' MD TO 10462' MD
840 FT IN 12 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1800 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 170 KLBS, SO 65 KLBS, ROT 106 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2259 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9705' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9996' MD, 25% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10279' MD, 25% INCREASE IN
CUTTINGS BACKAT SHAKERS
12:00 00:00 12.00 DRILL P 11,402.00 PROD1
DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 10462' MD TO 11402' MD
940 FT IN 12 HRS: 78 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1900 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 54 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2000 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10559' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10843' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEPAT 111255' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11.21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 54 of 55
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881 .00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM I Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
-- - (hr) -- - - — --- (usft) 1
11/15/2019 00:00 - 01:30 1.50 DRILL P 11,506.00 PR- 1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
Printed 12/17/2019 11.21.21AM **Ali depths reported in Drillers Depths**
SECTION FROM 11402 MD TO 11506 MD
104 FT IN 1.5 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1950 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 54 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 400
UNITS, MAX AT 700 UNITS
TD WAS CALLED EARLY DUE TO
ENCOUNTERING AN UNEXPECTED FAULT AT
10926' MD AND ENCOUNTERED LOW
RESISTIVITY, ATTEMPTED TO DECREASE
INCLINATION TO FIND TARGET SAND WITH
NO SUCCESS
01 30 03.30 2.00 DRILL P 11,506.00
PROD1 'CIRCULATE HOLE CLEAN WITH 2X BOTTOMS
UP
350 GPM, 2250 PSI
140 RPM, 11 KFT-LBS TORQUE
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP, 50% INCREASE IN CUTTINGS BACK
AT SHAKERS
MONITOR THE WELL FOR 10 MIN (STATIC)
03.30 10.00 6.50 DRILL P 11,506.00
PROD1 PULL OUT OF THE HOLE FOR PLANNED
SHORT TRIP FROM 11506' MD TO 7-5/8"
WINDOWAT 5849' MD
OBSERVE 20-30 KLBS DRAG AT 11005MD
BACKREAM FROM 11005' MD TO 10460' MD,
320 GPM, 120 RPM, 1000 FPM
- OBSERVE OVERPULL WITH THE BHA
STABILIZERS ACROSS THE WINDOW,
ATTEMPT TO WORK STABILIZERS THROUGH
WINDOW WITHOUT ROTATION WITH NO
SUCCESS, PUMP AND ROTATE TO PULL
STABILIZERS INTO WINDOW, ATTEMPT TO
DRESS WINDOW WITH STABILIZERS WITH
320 GPM, 40-60 RPM
- MONITOR THE WELL FOR 10 MIN AT THE
WINDOW (STATIC)
10:00 13:00 3.00 DRILL P 11,506.00
PROD1 RUN IN THE HOLE ON ELEVATORS FROM
5849' MD TO BOTTOM AT 11 506'MD
- NO ISSUES RUNNING THROUGH OPEN
HOLE
13.00 15.30 2.50 DRILL P 11,506.00
PROD1 CIRCULATE HOLE CLEAN ON BOTTOM
320 GPM, 1920 PSI
120 RPM, 10 KFT-LBS TORQUE
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP, 25% INCREASE IN CUTTINGS BACK
AT SHAKERS
- SPOT 290 BBL 4% LUBE SWEEP ON
BOTTOM
- MONITOR WELL FOR 10 MIN (STATIC)
Printed 12/17/2019 11.21.21AM **Ali depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 55 of 55
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
15:30 - 20:30 5.00 DRILL P 11,506.00 PROD1 PULL OUT OF THE HOLE FROM BOTTOM AT
20:30 - 22:00 1.50 DRILL P
11506' MD TO THE TOP OF THE BHAAT 156'
MD
- MONITOR WELL FOR 10 MIN AT THE
WINDOW AND THE TOP OF THE BHA (STATIC)
- NO ISSUES PULLING THROUGH OPEN
HOLE, OBSERVED 10-20 KLBS OVERPULL
WITH BHA STABILIZERS ACROSS WINDOW
11,506.00 PROD1 LAY DOWN BHA FROM 156' MD TO SURFACE
-BIT GRADE: 1 -1 -IN GAUGE
***END DON EVENT AT 22:00, SEE CON
EVENT***
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 1 of 4
Common Well Name: S-202 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 11/15/2019 End Date: 11/19/2019 H-S4DW0019CM-EX-DI-DN- (8,102,923.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs TaskCode NPT Total Depth Phase Description of Operations
(hr) _ (usft) _ -
11/15/2019 22:00 22 30 0.50 T CASING P 11,506.00 RUNPRD CLEAN AND CLEAR RIG FLOOR
- HOIST MILLING ASSEMBLY TO RIG FLOOR
22:30 00 00 1.50CASING P 11,506.00 RUNPRD MAKE UP WINDOW MILLING BHA WITH JUNK
BASKETS TO TOTAL LENGTH OF 61' MD
11/16/2019 00:00 02.30 2.50 CASING P 11,506.00 RUNPRD RUN IN THE HOLE WITH WINDOW MILLING
ASSEMBLY ON 4" DP TO 5880' MD
DRIFT WINDOW WITH MILLS UNTIL UPPER
MILL 3' OUTSIDE WINDOW WITH NO ISSUES
MONITOR WELL FOR 10 MIN (STATIC)
02:30 05:00 2.50 CASING P 11,506.00 RUNPRD PULL OUT OF THE HOLE FROM 5865' MD TO
THE TOP OF THE BHA AT 61' MD
NO ISSUES PULLING MILLS THROUGH
_ _ WINDOW_
05:00 06:00 1.00 CASING P 11,506.00 RUNPRD LAY DOWN MILLING ASSEMBLY FROM 61' TO
SURFACE
06:00 06:30 0.50 CASING P 11,506.00 RUNPRD MAKE UP WHIPSTOCK RETRIEVAL ASSEMBLY
WITH BAKER MWD TO 98' MD
06:30 09:30 3.00 CASING P 11,506.00 RUNPRD RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP FROM 98' MD
TO 5849' MD
SHALOW TEST THE MWD AT 2200' MD
CLEAN OUT WHIP STOCK RETRIEVAL SLOT
WITH 350 GPM, 1350 PSI
ORIENT HOOK
ENGAGE WHIPSTOCK, SHEAR ANCHOR AND
UNSEAT WHIPSTOCK WITH 100 KLBS
OVERPULL _
09:30 10:30 1.00 CASING P r 11,506.00 RUNPRD CIRCULATE BOTTOMS UP
350 GPM, 1350 PSI
DROP 2-3/8" DRIFT
MONITOR WELL FOR 10 MIN (STATIC)
10:30 - 15:30 5.00 CASING P 11,506.00 RUNPRD PULL OUT OF THE HOLE WITH WHIPSTOCK
FROM 5849' MD TO SURFACE
- LAY DOWN WHIPSTOCKAND RETRIEVAL
ASSEMBLY, NO ABNORMAL MARKINGS ON
,WHIPSTOCK
NOTE DIRECTION WHIPSTOCK CAME OUT
OF THE HOLE
15:30 - 16:30 1.00 CASING P 11,506.00 RUNPRD RIG UP TO RUN 4-1/2" SLOTTED LINER
- DOUBLE STACK TONGS, AIR SLIPS AND
ELEVATORS
16 30 00:00 7 50 CASING P 11,506.00 RUNPRD RUN 4.5", 12.6#, L-80 SLOTTED LINER TO
TOTAL LENGTH OF 5619 ' MD
USE BEST 0 LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
-RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
ORIENT BENT JOINT TO THE DIRECTION
THE WHIPSTOCK CAME OUT OF THE HOLE,
NO ISSUES ENTERING LATERAL WITH BENT
JOINT
MAKE UP HOOK HANGER ASSEMBLY WITH
INNER STRING AND SLIMHOLE MWD
SHALLOW TEST THE MWD AT 5619' MD
LINER WEIGHT PU 101 KLBS, SO 79 KLBS
Printed 12/17/2019 11 22.22AM **All depths reported in Drillers Depths""
North America - ALASKA - BP
Operation Summary Report
Page 2 of 4
Common Well Name: 5-202
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 11/15/2019
End Date: 11/19/2019
H-S4DW0019CM-EX-DI-DN- (8,102,923.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date
From - To
Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
11/17/2019
00:00 03:00 3.00
CASINGP
11,506.00 r
RUNPRD
CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 5619' MD TO
PLANNED SET DEPTH AT 11461' MD
RIH AT 90 FPM PER BAKER REP
NO ISSUES RUNNING THROUGH OPEN
HOLE
- FINAL PU 140 KLBS, SO 75 KLBS
03:00 05:00 2.00
CASING P
11,506.00
RUNPRD
SET HOOK HANGER AND RELEASE
ORIENT HOOK HANGER TO 17° LOHS
120 GPM, 600 PSI
TAG BOTTOM OF WINDOW WITH HOOK
HANGER ON DEPTH, SET DOWN 20 KLBS
PICK UP AND ORIENT 163° ROHS, RIH PAST
BOTTOM OF WINDOW WITH HOOK HANGER
-3-
-PICK UP AND ORIENT 17° LOHS, RIH AND
LAND HOOK HANGER ON BOTTOM OF
WINDOW, SET DOWN 20 KLBS
BREAK OUT OF STRING AND DROP BALL
PUMP BALL DOWN AND PRESSURE UP TO
3700 PSI, BLEED PRESSURE AND PICK UP TO
RELEASE FROM HANGER
- PU WEIGHT REDUCED 25 KLBS AFTER
RELEASING FROM LINER
PRESSURE UP TO 4150 PSI TO SHEAR OUT
BALL SEAT
TOP OF LINER AT 5843' MD, SHOE AT 11461'
MD
05:00 08:30 3.50
CASING P 11,506.00
RUNPRD
1 PULL OUT OF THE HOLE FROM THE LINER
TOP AT 5843' MD AND LAY DOWN LINER
RUNNING TOOLAND MWD
NO ISSUES WITH LINER RUNNING TOOL
08:30 11:30
3.00
CASING P
11,506.00
RUNPRD
MAKE UP LEM ASSEMBLYAND INNER STRING
WITH SLIMHOLE MWD TO TOTAL LENGTH OF
192' MD
11:30 15:30
4.00
CASING
P
11,506.00
RUNPRD
RUN IN THE HOLE WITH LEM ASSEMBLY ON
4" DP FROM 220' MD TO SET DEPTH AT 5935'
MD
SHALLOW HOLE TEST MWD AT 250' MD
ORIENT LEM PRIOR TO ENTERING HOOK
LHANGER
LEMSEALASSEMBLY 14'INSIDE SEALBORE
XTENSION ON LINER #4
Printed 12/17/2019 11 22 22A "All depths reported in Drillers Depths—
North America - ALASKA - BP Page 3 of 4
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 11/15/2019 End Date: 11/19/2019
H-S4DW0019CM-EX-DI-DN- (8,102,923 00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
- - (hr) --
- - - (usft)
15:30 21:30 6.00
CASING P 11,506.00 RUNPRD
SET AND RELEASE FROM LINER HANGER
CONFIRM STABBED IN HOOK HANGER
ASSEMBLY
DROP BALLAND PUMP DOWN TO BALL
SEAT
PRESSURE UP TO 2500 PSI, OBSERVE
INDICATION OF PUSHER TOOLACTIVATING
AND SETTING PACKER
ATTEMPT TO INCREASE PRESSURE TO 4100
PSI TO ACTIVATE RELEASE MECHANISM,
BURST DISK PREMATURELY BURST AT 3980
PSI
UNABLE TO RELEASE FROM LINER,
PERFORM LEFT HAND RELEASE
PROCEDURE TO RELEASE FROM LINER
-AFTER RELEASING FROM LINER AND PRIOR
TO PULLING OUT OF PACKOFF, PERFORM 5
MIN ASSURANCE TEST ON LTP TO 3500 PSI
(GOOD TEST)
LINER TOP AT 5743' MD
21:30 22:30 1.00
CASING P — 11,506.00 RUNPRD
PULL 2 STANDS TO 5566' MD
CUTAND SLIP DRILL LINE
- RECALIBRATE BLOCK HEIGHT
2230 0000 1.50
CASING P 11,506.00 RUNPRD
PULL OUT OF THE HOLE FROM 5566' MD TO
2500' MD
MONITOR WELL FOR 10 MIN (STATIC_ )
11/18!2019 00:00 01:30 1.50
CASING P r 11,506.00 1 RUNPRD
PULL OUT OF THE HOLE FROM 5566' MD TO
2500' M D
LAY DOWN RUNNING TOOLS AND MWD
NO ISSUES WITH RUNNING TOOL
PERFORM WEEKLY BOPE FUNCTION TEST
01:30 02:00 0.50
RUNCOM P 11,506.00 RUNCMP
CLEAN AND CLEAR RIG FLOOR
02:00 04:00 2.00
RUNCOM P 11,506.00 RUNPRD
RIG UP TO RUN TUBING
- DOUBLE STACK TONGS WITH TORQUE
TURN
-AIR SLIPS, CASING ELEVATORS
- SLB I -WIRE SPOOL
04 00 19:30 15.50
RUNCOM P 11,506 00 RUNPRD
RUN 4-1/2", 12.6#, 13CR-85, COMPLETION
TUBING TO TOTAL LENGTH OF 5752' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 4440
FT -LBS
RIH AT 90 FPM PER HES
MUD WEIGHT IN/OUT 9.1 PPG
FINAL PU 100 KLBS, SO 80 KLBS
PARKER 272 BLOCK WEIGHT 35 KLBS
SPACE OUT AND TERMINATE I -WIRE
LAND TUBING AND RUN IN LOCK DOWN
SCREWS
19:30 21:30 2.00
RUNCOM P 11,506.00 RUNPRD
DISPLACE WELL TO 9.8 PPG BRINE
4 BPM, 300 PSI
SPOT INHIBITED 9.8 PPG BRINE FROM
SURFACE TO WLEG
OVER DISPLACE BY 5 BBL, PUMP 5 BBL
DOWN TUBING TO WASH OFF RHC PLUG
Printed 12/17/2019 11.22.22AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 4 of 4
Common Well Name: S-202 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 11/15/2019 End Date: 11/19/2019 H-S4DW0019CM-EX-DI-DN- (8,102,923.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
(hr)
21:30 - 23:00 1.50
23:00 - 00:00 1.00
11/19/2019 00:00 - 01:30 1.50
101:30 - 06:00 4.50
I
06 00 - 14.00 8.00
Printed 12/17/2019 11:22 22AM *'All depths reported in Drillers Depths`*
escription of Operations
T TUBING AND IA
ST TUBING TO 3500 PSI FOR
EST)
DUCTION PACKER SET AT
TO 2000 PSI
RE ON TUBING AND
T IA TO 3500 PSI FOR 30 MIN
VED BY WSUP
URE FROM TUBING TO
VE IN GLM#3
BBL EACH WAY TO CONFIRM
800_-900 PSI
FOR 1 HR PRIOR TO
C
D FOR INSTALLING TWC
IN STACK
W BOX
ON TO INSTALL TWC
TACK
ST TWC FROM BELOW TO
MIN (GOOD TEST)
OP STACKAND HIGH
RS
SER
W LINE, TURN BUCKLES AND
ON BOP STACK AND STAND
ON RISERS, PULLAND LAY
VOID TO 4500 PSI FOR 15
)
500 PSI (VISUAL LEAK
RE
- GENERAL RIG DOWN OPERATIONS
t"*RIG RELEASED AT 14:00"'
Task
Code NPT
Total Depth
Phase D
RUNCOM
I P
_ (usft)
11,506.00
RUNPRD PRESSURE TES
- PRESSURE TE
30 MIN (GOOD T
- OBSERVE PRO
2050 PSI
- BLEED TUBING
HOLD PRESSU
PRESSURE TES
(GOOD TEST)
TESTS APPRO
BLEED PRESS
SHEAR OUT VAL
- PUMP BOTH 5
SHEAR, 2 BPM,
11,506.00
RUNCOM
P
RUNPRD MONITOR WELL
INSTALLING TW
BUILD DRY RO
RIG UP TO DRA
SUCK O_UT_FL_O
RUNCOM
P
11,506.00
RUNPRD
FMC ON LOCATI
DRAIN BOPE S
INSTALL TWC
PRESSURE TE
3500 PSI FOR 5
RUNCOM
-
P
11,506.00
-
j RUNPRD
NIPPLE DOWN B
PRESSURE RISE
PULL FLOW RI
RIG DOWN FLO
FILL UP LINE
BREAK BOLTS
BACK
BREAK BOLTS
DOWN
RUNCOM
P
11,506.00
RUNPRD
NIPPLE UP TREE
-TEST ADAPTER
MIN (GOOD TESL
TEST TREE TO,
TIGHT)
SUCK OUT TRE'
TERMINATE I W
SIMOPS:
Printed 12/17/2019 11:22 22AM *'All depths reported in Drillers Depths`*
escription of Operations
T TUBING AND IA
ST TUBING TO 3500 PSI FOR
EST)
DUCTION PACKER SET AT
TO 2000 PSI
RE ON TUBING AND
T IA TO 3500 PSI FOR 30 MIN
VED BY WSUP
URE FROM TUBING TO
VE IN GLM#3
BBL EACH WAY TO CONFIRM
800_-900 PSI
FOR 1 HR PRIOR TO
C
D FOR INSTALLING TWC
IN STACK
W BOX
ON TO INSTALL TWC
TACK
ST TWC FROM BELOW TO
MIN (GOOD TEST)
OP STACKAND HIGH
RS
SER
W LINE, TURN BUCKLES AND
ON BOP STACK AND STAND
ON RISERS, PULLAND LAY
VOID TO 4500 PSI FOR 15
)
500 PSI (VISUAL LEAK
RE
- GENERAL RIG DOWN OPERATIONS
t"*RIG RELEASED AT 14:00"'
North America - ALASKA - BP
PBU
S
S-202
S -202L1
500292364760
Design: S -202L1
Final Survey Report
18 November, 2019
Baker
Hughes
BP
Jll�p Final Survey Report Baker
Hughes
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
5-2021-1
Design:
S-2021-1
Local Co-ordinate Reference:
Well S-202
TVD Reference:
ACTUAL KB P272 @ 84.80usft
MD Reference:
ACTUAL KB P272 @ 84.80usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point
Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
S, TR -12-12
Site Position:
Northing:
5,980,854.540 usft
Latitude:
700 21' 23.002 N
From:
Map
Easting:
617,919.920 usft
Longitude:
149° 2'32.343 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
0.90 °
Well
S-202
Well Position
+N/ -S 0.00 usft
Northing:
5,979,262.560 usft
Latitude:
70° 21'7+196 N
+E/ -W 0.00 usft
Easting:
618,885.120 usft
Longitude:
149° 2'4.867 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
37.90 usft
Ground Level:
37.90 usft
Wellbore
S-2021-1
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(nT)
BGGM2018 10/1/2019
16.57
80.91
57,411.35520249
Design
S-2021-1
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth: 46.90
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(°)
46.90
0.00
0.00
338.35
11/18/2019 3: 20 45P
Page 2
COMPASS 5000.15 Build 90
Survey
MD
Inc
BP
TVD
TVDSS
N/S
bSurvey
Northing
Easting
DLeg
V. Sec
Baker
p
Final SuryReport
(usft)
Hughes
Company: North America - ALASKA - BP
(usft)
Local Co-ordinate Reference:
Well S-202
(°/100usft)
Project: PBU
46.90
TVD Reference:
ACTUAL KB P272 @ 84.80usft
46.90
Site: S
0.00
MD Reference:
ACTUAL KB P272 @ 84.80usft
618,885.120
Well: S-202
0.00
North Reference:
True
159.26
Wellbore: S-2021-1
13.96
Survey Calculation Method:
Minimum Curvature
5,979,262.522
Design: S -202L1
0.17
Database:
EDM R5K - Alaska PROD - ANCP1
0.00
Survey Program Date 11/18/2019
192.78
107.98
-0.11
0.04
From To
618,885.162
0.10
-0.11
249.87
(usft) (usft) Survey (Wellbore)
Tool Name
Description
165.07
-0.07
98.76 1,457.62 Survey #1 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
0.32
-0.11
1,515.57 3,039.76 Survey #2 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
340.74
255.94
3,078.60 3,078.60 Survey #3 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
618,885.187
0.43
3,172.96 6,729.26 Survey #4 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
340.31
433.08
6,786.12 12,777.00 Survey #5 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
5,979,262.890
618,884.951
Survey
MD
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
46.90
0.00
0.00
46.90
-37.90
0.00
0.00
5,979,262.560
618,885.120
0.00
0.00
98.76
0.09
159.26
98.76
13.96
-0.04
0.01
5,979,262.522
618,885.135
0.17
-0.04
192.78
0.00
41.48
192.78
107.98
-0.11
0.04
5,979,262.454
618,885.162
0.10
-0.11
249.87
0.18
63.63
249.87
165.07
-0.07
0.12
5,979,262.495
618,885.242
0.32
-0.11
340.74
0.26
298.83
340.74
255.94
0.10
0.07
5,979,262.657
618,885.187
0.43
0.06
433.08
0.18
340.31
433.08
348.28
0.33
-0.16
5,979,262.890
618,884.951
0.19
0.37
525.71
0.26
337.50
525.71
440.91
0.66
-0.29
5,979,263.219
618,884.816
0.09
0.73
617.86
0.18
309.73
617.86
533.06
0.95
-0.49
5,979,263.502
618,884.620
0.14
1.06
710.75
0.79
125.86
710.75
625.95
0.67
-0.08
5,979,263.227
618,885.031
1.04
0.65
802.03
2.61
115.66
801.98
717.18
-0.60
2.31
5,979,261.996
618,887.434
2.01
-1.41
894.35
3.88
102.66
894.15
809.35
-2.20
7.25
5,979,260.480
618,892.401
1.58
-4.71
985.90
5.66
104.77
985.38
900.58
-4.03
14.64
5,979,258.768
618,899.817
1.95
-9.14
1,080.50
6.87
108.98
1,079.42
994.62
-7.06
24.50
5,979,255.895
618,909.724
1.37
-15.59
1,174.93
8.63
110.74
1,172.98
1,088.18
-11.40
36.46
5,979,251.740
618,921.758
1.88
-24.05
1,268.85
9.93
119.88
1,265.67
1,180.87
-17.93
50.08
5,979,245.427
618,935.471
2.09
-35.14
1,363.75
10.20
122.70
1,359.11
1,274.31
-26.55
64.24
5,979,237.037
618,949.771
0.59
-48.37
1,457.62
13.52
127.62
1,450.97
1,366.17
-37.74
79.93
5,979,226.097
618,965.636
3.69
-64.56
1,515.57
15.03
132.99
1,507.13
1,422.33
-47.00
90.80
5,979,217.012
618,976.643
3.46
-77.18
1,609.93
15.66
139.23
1,598.13
1,513.33
-64.99
108.06
5,979,199.301
618,994.192
1.87
-100.27
11/18/2019 3:20.45PM
Page 3
COMPASS 5000.15 Build 90
Survey
MD
BP
Azi
ND
TVDSS
N/S
E/W
Northing
Easting
Baker 89
1"
Final Survey Report
(')
Hughes
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
(usft)
Project: PBU
ND Reference:
ACTUAL KB P272 @ 84.80usft
(usft)
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
1,688.20
Well: S-202
North Reference:
True
5,979,176.606
Wellbore: S -202L1
Survey Calculation Method:
Minimum Curvature
1,737.16
Design: S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
1,633.89
Survey
MD
Inc
Azi
ND
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(')
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
1,704.50
19.79
146.14
1,688.20
1,603.40
-87.96
125.33
5,979,176.606
619,011.817
4.89
-127.99
1,737.16
22.27
147.74
1,718.69
1,633.89
-97.79
131.71
5,979,166.884
619,018.356
7.79
-139.48
1,768.14
23.59
149.19
1,747.22
1,662.42
-108.08
138.02
5,979,156.697
619,024.827
4.63
-151.37
1,800.01
24.95
150.10
1,776.27
1,691.47
-119.38
144.64
5,979,145.500
619,031.622
4.43
-164.31
1,895.26
26.83
152.03
1,861.96
1,777.16
-155.78
164.74
5,979,109.422
619,052.294
2.16
-205.56
1,989.23
25.76
152.73
1,946.20
1,861.40
-192.66
184.04
5,979,072.856
619,072.178
1.19
-246.96
2,084.22
26.47
155.63
2,031.50
1,946.70
-230.30
202.23
5,979,035.519
619,090.965
1.54
-288.66
2,178.02
29.06
158.33
2,114.50
2,029.70
-270.52
219.27
5,978,995.577
619,108.641
3.07
-332.33
2,211.11
31.36
158.95
2,143.09
2,058.29
-286.02
225.34
5,978,980.170
619,114.946
7.01
-348.97
2,242.35
33.60
159.95
2,169.44
2,084.64
-301.73
231.22
5,978,964.558
619,121.078
7.37
-365.75
2,272.90
35.69
161.09
2,194.57
2,109.77
-318.11
237.01
5,978,948.280
619,127.124
7.16
-383.10
2,305.40
36.32
161.76
2,220.87
2,136.07
-336.22
243.09
5,978,930.270
619,133.495
2.29
-402.18
2,337.03
35.45
162.18
2,246.49
2,161.69
-353.85
248.83
5,978,912.736
619,139.512
2.86
-420.68
2,367.50
34.73
162.12
2,271.42
2,186.62
-370.52
254.20
5,978,896.152
619,145.145
2.37
-438.16
2,400.03
34.75
162.17
2,298.16
2,213.36
-388.16
259.88
5,978,878.601
619,151.107
0.11
-456.65
2,430.92
35.52
162.02
2,323.42
2,238.62
-405.08
265.35
5,978,861.775
619,156.840
2.51
-474.39
2,462.68
37.24
162.40
2,348.99
2,264.19
-423.02
271.10
5,978,843.933
619,162.877
5.46
-493.19
2,494.29
38.29
162.30
2,373.97
2,289.17
-441.46
276.97
5,978,825.583
619,169.039
3.33
-512.50
2,526.79
39.05
162.35
2,399.35
2,314.55
-460.81
283.14
5,978,806.337
619,175.510
2.34
-532.76
2,557.05
39.11
162.61
2,422.84
2,338.04
-479.00
288.88
5,978,788.241
619,181.540
0.58
-551.78
2,588.78
38.58
163.02
2,447.55
2,362.75
-498.02
294.76
5,978,769.325
619,187.721
1.86
-571.62
2,622.51
38.26
163.79
2,473.98
2,389.18
-518.10
300.75
5,978,749.337
619,194.025
1.71
-592.50
2,651.20
37.01
164.08
2,496.70
2,411.90
-534.94
305.60
5,978,732.584
619,199.139
4.40
-609.94
2,683.75
35.84
164.07
2,522.89
2,438.09
-553.52
310.90
5,978,714.086
619,204.736
3.59
-629.17
2,714.44
35.14
165.22
2,547.88
2,463.08
-570.70
315.62
5,978,696.985
619,209.727
3.15
-646.88
2,745.52
34.73
166.06
2,573.36
2,488.56
-587.94
320.03
5,978,679.817
619,214.414
2.03
-664.53
2,776.92
34.62
166.52
2,599.18
2,514.38
-605.30
324.27
5,978,662.533
619,218.923
0.90
-682.23
11/18/2019 3:20:45PM
Page 4
COMPASS 5000.15 Build 90
Survey
MD
Inc
BP
ND
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
Baker
p
(°)
Final Survey Report
(usft)
Hughes
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 5-202
(usft)
Project:
PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
2,540.27
Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
2.14
Well:
S-202
North Reference:
True
2,651.40
Wellbore:
S -202L1
Survey Calculation Method:
Minimum Curvature
619,227.079
Design:
S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
170.21
Survey
MD
Inc
Azi
ND
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft
(usft)
2,808.35
34.43
167.66
2,625.07
2,540.27
-622.66
328.25
5,978,645.237
619,223.177
2.14
-699.83
2,840.13
33.68
168.84
2,651.40
2,566.60
-640.08
331.87
5,978,627.876
619,227.079
3.15
-717.36
2,871.93
32.76
170.21
2,678.01
2,593.21
-657.21
335.04
5,978,610.800
619,230.519
3.73
-734.45
2,903.48
31.69
171.88
2,704.70
2,619.90
-673.83
337.66
5,978,594.229
619,233.405
4.41
-750.87
2,934.19
30.55
173.39
2,730.99
2,646.19
-689.57
339.70
5,978,578.525
619,235.692
4.50
-766.25
2,965.77
29.72
174.22
2,758.30
2,673.50
-705.33
341.42
5,978,562.795
619,237.654
2.94
-781.53
2,997.97
28.94
174.46
2,786.37
2,701.57
-721.03
342.97
5,978,547.127
619,239.458
2.45
-796.69
3,029.12
28.38
175.18
2,813.70
2,728.90
-735.90
344.32
5,978,532.273
619,241.044
2.11
-811.02
3,039.76
28.20
175.15
2,823.07
2,738.27
-740.93
344.75
5,978,527.256
619,241.548
1.70
-815.85
3,078.60
27.19
175.78
2,857.46
2,772.66
-758.92
346.17
5,978,509.288
619,243.263
2.71
-833.10
3,172.96
23.79
177.85
2,942.63
2,857.83
-799.45
348.48
5,978,468.802
619,246.206
3.72
-871.62
3,205.03
22.91
180.16
2,972.07
2,887.27
-812.16
348.70
5,978,456.102
619,246.633
3.96
-883.51
3,235.87
21.10
182.40
3,000.66
2,915.86
-823.71
348.45
5,978,444.550
619,246.567
6.47
-894.16
3,267.80
19.97
185.16
3,030.57
2,945.77
-834.88
347.72
5,978,433.367
619,246.013
4.66
-904.27
3,330.38
18.43
190.19
3,089.67
3,004.87
-855.27
345.01
5,978,412.947
619,243.626
3.61
-922.22
3,424.67
15.61
199.80
3,179.84
3,095.04
-881.88
338.07
5,978,386.226
619,237.113
4.21
-944.40
3,519.82
13.16
209.96
3,272.01
3,187.21
-903.32
328.32
5,978,364.640
619,227.706
3.69
-960.73
3,614.63
11.39
223.06
3,364.67
3,279.87
-919.51
316.54
5,978,348.261
619,216.181
3.47
-971.43
3,709.05
11.22
239.43
3,457.28
3,372.48
-931.00
302.26
5,978,336.550
619,202.087
3.39
-976.84
3,802.91
11.42
256.02
3,549.34
3,464.54
-937.89
285.38
5,978,329.393
619,185.316
3.46
-977.02
3,897.98
12.45
270.20
3,642.37
3,557.57
-940.13
265.99
5,978,326.847
619,165.970
3.26
-971.95
3,992.53
13.96
280.13
3,734.43
3,649.63
-938.09
244.57
5,978,328.549
619,144.519
2.88
-962.15
4,086.74
16.20
289.05
3,825.40
3,740.60
-931.80
220.95
5,978,334.463
619,120.810
3.42
-947.59
4,181.50
18.44
297.30
3,915.88
3,831.08
-920.61
195.13
5,978,345.242
619,094.818
3.50
-927.67
4,276.00
20.84
304.35
4,004.88
3,920.08
-904.26
167.97
5,978,361.152
619,067.397
3.56
-902.45
4,370.62
23.74
309.10
4,092.43
4,007.63
-882.75
139.28
5,978,382.207
619,038.377
3.61
-871.87
4,465.23
26.51
313.05
4,178.09
4,093.29
-856.32
109.06
5,978,408.154
619,007.747
3.42
-836.16
11/18/2019 3:20:45PM
Page 5
COMPASS 5000.15 Build 90
by BP
Final Survey Report Baker
Hughes
Company: North America - ALASKA -
BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S -202L1
Survey Calculation
Method:
Minimum Curvature
Design: S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
ENV
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
4,559.49
28.92
314.66
4,261.53
4,176.73
-825.93
77.47
5,978,438.032
618,975.682
2.68
-796.26
4,654.63
32.06
316.04
4,343.50
4,256.70
-791.58
43.58
5,978,471.842
618,941.245
3.38
-751.83
4,748.63
35.01
317.55
4,421.85
4,337.05
-753.71
8.05
5,978,509.134
618,905.125
3.26
-703.53
4,844.09
37.86
316.99
4,498.64
4,413.84
-712.08
-30.42
5,978,550.149
618,866.001
3.01
-650.64
4,938.94
40.92
317.47
4,571.94
4,487.14
-667.89
-71.29
5,978,593.677
618,824.446
3.24
-594.50
5,033.31
44.03
316.43
4,641.53
4,556.73
-621.34
-114.79
5,978,639.526
618,780.210
3.38
-535.18
5,127.83
46.72
316.86
4,707.93
4,623.13
-572.43
-160.97
5,978,687.697
618,733.269
2.86
-472.69
5,222.28
49.76
316.70
4,770.82
4,686.02
-521.10
-209.21
5,978,738.255
618,684.221
3.22
-407.18
5,317.37
52.83
318.18
4,830.28
4,745.48
-466.43
-259.38
5,978,792.110
618,633.198
3.45
-337.86
5,411.18
55.33
319.19
4,885.31
4,800.51
-409.37
-309.52
5,978,848.365
618,582.161
2.80
-266.33
5,505.83
58.24
320.57
4,937.15
4,852.35
-348.82
-360.53
5,978,908.098
618,530.203
3.31
-191.23
5,601.08
61.08
322.45
4,985.26
4,900.46
-284.47
-411.66
5,978,971.617
618,478.055
3.43
-112.56
5,695.74
64.15
323.49
5,028.80
4,944.00
-217.37
-462.27
5,979,037.898
618,426.397
3.39
-31.53
5,790.51
66.23
324.08
5,068.57
4,983.77
-147.97
-513.09
5,979,106.479
618,374.489
2.27
51.72
5,885.08
67.18
324.46
5,105.96
5,021.16
-77.46
-563.81
5,979,176.170
618,322.659
1.07
135.97
5,980.20
69.64
324.46
5,140.96
5,056.16
-5.50
-615.22
5,979,247.304
618,270.120
2.59
221.83
6,074.80
69.83
325.21
5,173.73
5,088.93
67.05
-666.33
5,979,319.026
618,217.870
0.77
308.11
6,169.30
73.18
325.23
5,203.70
5,118.90
140.65
-717.44
5,979,391.797
618,165.599
3.55
395.37
6,263.73
76.20
324.29
5,228.63
5,143.83
215.02
-769.99
5,979,465.323
618,111.880
3.34
483.89
6,359.15
78.85
323.80
5,249.24
5,164.44
290.43
-824.69
5,979,539.848
618,055.996
2.82
574.16
6,453.15
81.47
322.70
5,265.31
5,180.51
364.63
-880.10
5,979,613.154
617,999.418
3.02
663.56
6,547.98
84.01
322.57
5,277.29
5,192.49
439.39
-937.19
5,979,686.991
617,941.158
2.68
754.11
6,641.87
86.78
323.18
5,284.83
5,200.03
514.00
-993.67
5,979,760.691
617,883.508
3.02
844.29
6,708.02
88.93
323.52
5,287.30
5,202.50
567.04
-1,033.12
5,979,813.086
617,843.218
3.29
908.14
6,729.26
89.61
323.89
5,287.57
5,202.77
584.15
-1,045.69
5,979,830.000
617,830.378
3.64
928.68
6,786.12
92.54
324.83
5,286.51
5,201.71
630.35
-1,078.82
5,979,875.661
617,796.529
5.41
983.84
6,816.02
94.86
324.97
5,284.58
5,199.78
654.76
-1,095.97
5,979,899.794
617,778.990
7.77
1,012.86
11/18/2019 3:20:45PM Page 6 COMPASS 5000.15 Build 90
by BP
VI.! -Final Survey Report Baker
Hughes
Company: North America - ALASKA -
BP
Local Co-ordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S -202L1
Survey Calculation Method:
Minimum Curvature
Design: S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
ENV
Northing
Easting DLeg
V. Sec
(usft) V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
6,848.25
97.64
325.24
5,281.07
5,196.27
681.03
-1,114.30
5,979,925.773
617,760.250
8.67
1,044.04
6,879.69
99.48
325.32
5,276.39
5,191.59
706.59
-1,132.01
5,979,951.039
617,742.142
5.86
1,074.32
6,910.71
99.87
325.57
5,271.18
5,186.38
731.77
-1,149.35
5,979,975.943
617,724.402
1.49
1,104.13
7,004.96
100.56
323.04
5,254.46
5,169.66
807.10
-1,203.46
5,980,050.393
617,669.104
2.74
1,194.10
7,099.99
100.65
322.42
5,236.97
5,152.17
881.43
-1,260.03
5,980,123.812
617,611.373
0.65
1,284.06
7,194.95
100.56
321.65
5,219.49
5,134.69
955.01
-1,317.45
5,980,196.472
617,552.798
0.80
1,373.63
7,289.33
100.59
321.79
5,202.17
5,117.37
1,027.84
-1,374.92
5,980,268.374
617,494.179
0.15
1,462.53
7,383.65
99.85
322.47
5,185.44
5,100.64
1,101.12
-1,431.90
5,980,340.729
617,436.048
1.06
1,551.65
7,478.97
100.62
322.19
5,168.50
5,083.70
1,175.37
-1,489.23
5,980,414.053
617,377.558
0.86
1,641.81
7,573.73
100.62
322.33
5,151.04
5,066.24
1,249.02
-1,546.23
5,980,486.785
617,319.394
0.15
1,731.30
7,605.96
100.65
322.31
5,145.09
5,060.29
1,274.09
-1,565.60
5,980,511.543
617,299.638
0.11
1,761.74
7,637.38
100.44
323.12
5,139.34
5,054.54
1,298.67
-1,584.31
5,980,535.817
617,280.541
2.62
1,791.49
7,668.70
99.77
323.27
5,133.84
5,049.04
1,323.35
-1,602.78
5,980,560.207
617,261.680
2.19
1,821.25
7,700.61
98.11
322.85
5,128.88
5,044.08
1,348.55
-1,621.72
5,980,585.095
617,242.341
5.36
1,851.65
7,732.80
96.50
322.81
5,124.79
5,039.99
1,373.99
-1,641.01
5,980,610.225
617,222.651
5.00
1,882.42
7,763.46
94.89
321.55
5,121.75
5,036.95
1,398.09
-1,659.72
5,980,634.021
617,203.566
6.66
1,911.72
7,796.10
92.93
321.27
5,119.52
5,034.72
1,423.54
-1,680.03
5,980,659.146
617,182.856
6.07
1,942.87
7,827.01
91.36
321.55
5,118.37
5,033.57
1,447.68
-1,699.30
5,980,682.977
617,163.211
5.16
1,972.41
7,858.40
90.78
322.62
5,117.78
5,032.98
1,472.44
-1,718.58
5,980,707.426
617,143.537
3.88
2,002.54
7,953.14
88.88
325.74
5,118.06
5,033.26
1,549.25
-1,774.02
5,980,783.337
617,086.894
3.86
2,094.38
8,047.51
89.91
326.98
5,119.06
5,034.26
1,627.81
-1,826.29
5,980,861.051
617,033.385
1.71
2,186.68
8,143.19
89.88
327.73
5,119.23
5,034.43
1,708.37
-1,877.90
5,980,940.780
616,980.505
0.78
2,280.60
8,238.14
89.73
326.71
5,119.56
5,034.76
1,788.20
-1,929.31
5,981,019.776
616,927.843
1.09
2,373.76
8,333.18
88.14
324.29
5,121.32
5,036.52
1,866.50
-1,983.13
5,981,097.209
616,872.796
3.05
2,466.40
8,427.86
88.53
322.61
5,124.07
5,039.27
1,942.53
-2,039.49
5,981,172.324
616,815.243
1.82
2,557.85
8,522.32
91.84
322.71
5,123.77
5,038.97
2,017.62
-2,096.77
5,981,246.489
616,756.778
3.51
2,648.77
8,616.58
90.08
320.99
5,122.19
5,037.39
2,091.73
-2,154.99
5,981,319.659
616,697.401
2.61
2,739.13
11/18/2019 3:20:45PM
Page 7
COMPASS 5000.15 Build 90
_ b BP
Final Survey Repoli Baker SHughes
Company: North America
- ALASKA - BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S-2021-1
Survey Calculation
Method:
Minimum Curvature
Design: S-2021-1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
N/S
ENV
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
8,649.40
89.91
323.19
5,122.19
5,037.39
2,117.62
-2,175.15
5,981,345.226
616,676.830
6.72
2,770.64
8,681.06
89.82
325.03
5,122.27
5,037.47
2,143.27
-2,193.71
5,981,370.574
616,657.868
5.82
2,801.32
8,712.52
89.85
326.06
5,122.36
5,037.56
2,169.21
-2,211.51
5,981,396.227
616,639.661
3.28
2,832.00
8,807.01
89.33
328.78
5,123.03
5,038.23
2,248.82
-2,262.38
5,981,475.014
616,587.535
2.93
2,924.76
8,838.88
89.12
330.26
5,123.47
5,038.67
2,276.28
-2,278.55
5,981,502.215
616,570.939
4.69
2,956.25
8,870.70
89.15
331.32
5,123.95
5,039.15
2,304.05
-2,294.07
5,981,529.733
616,554.975
3.33
2,987.79
8,902.12
91.60
335.32
5,123.74
5,038.94
2,332.12
-2,308.18
5,981,557.569
616,540.429
14.93
3,019.08
8,934.01
91.09
338.53
5,122.99
5,038.19
2,361.45
-2,320.67
5,981,586.691
616,527.472
10.19
3,050.94
8,969.00
89.12
338.35
5,122.93
5,038.13
2,393.99
-2,333.53
5,981,619.021
616,514.101
5.65
3,085.93
8,997.07
88.90
337.30
5,123.41
5,038.61
2,419.97
-2,344.12
5,981,644.837
616,503.098
3.82
3,114.00
9,092.07
89.87
336.07
5,124.43
5,039.63
2,507.21
-2,381.72
5,981,731.457
616,464.126
1.65
3,208.95
9,187.21
90.92
335.41
5,123.78
5,038.98
2,593.94
-2,420.81
5,981,817.553
616,423.669
1.30
3,303.98
9,281.62
92.12
337.38
5,121.27
5,036.47
2,680.42
-2,458.59
5,981,903.409
616,384.516
2.44
3,398.30
9,376.21
92.06
338.41
5,117.82
5,033.02
2,768.00
-2,494.16
5,981,990.404
616,347.563
1.09
3,492.82
9,470.72
92.09
342.24
5,114.40
5,029.60
2,856.91
-2,525.96
5,982,078.799
616,314.366
4.05
3,587.20
9,565.92
92.13
345.97
5,110.89
5,026.09
2,948.40
-2,552.01
5,982,169.848
616,286.869
3.92
3,681.84
9,661.18
92.22
348.68
5,107.28
5,022.48
3,041.26
-2,572.89
5,982,262.360
616,264.515
2.84
3,775.85
9,755.64
92.74
350.55
5,103.19
5,018.39
3,134.08
-2,589.90
5,982,354.892
616,246.035
2.05
3,868.41
9,850.79
92.19
349.54
5,099.10
5,014.30
3,227.71
-2,606.34
5,982,448.240
616,228.119
1.21
3,961.49
9,945.81
91.08
350.60
5,096.39
5,011.59
3,321.26
-2,622.72
5,982,541.516
616,210.260
1.61
4,054.49
10,040.73
91.26
351.65
5,094.45
5,009.65
3,415.03
-2,637.36
5,982,635.027
616,194.135
1.12
4,147.04
10,135.91
90.28
354.58
5,093.17
5,008.37
3,509.50
-2,648.76
5,982,729.300
616,181.231
3.25
4,239.06
10,229.43
89.85
355.47
5,093.06
5,008.26
3,602.67
-2,656.87
5,982,822.318
616,171.645
1.06
4,328.65
10,322.13
90.83
355.12
5,092.51
5,007.71
3,695.05
-2,664.48
5,982,914.563
616,162.577
1.12
4,417.33
10,419.83
91.41
356.76
5,090.60
5,005.80
3,792.48
-2,671.39
5,983,011.865
616,154.117
1.78
4,510.44
10,514.74
90.93
355.65
5,088.66
5,003.86
3,887.16
-2,677.67
5,983,106.426
616,146.336
1.27
4,600.76
10,609.49
90.37
356.29
5,087.59
5,002.79
3,981.67
-2,684.33
5,983,200.809
616,138.179
0.90
4,691.06
11/18/2019 3:20:45PM
Page 8
COMPASS 5000.15 Build 90
by BP
Final Sulvey Report Baker
Hughes
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
Project:
PBU
ND Reference:
ACTUAL KB P272 @ 84.80usft
Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well:
S-202
North Reference:
True
Wellbore:
S -202L1
Survey Calculation Method:
Minimum Curvature
Design:
S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi
TVD
TVDSS
N/S
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
10,701.41
89.82
356.28
5,087.44
5,002.64
4,073.40
-2,690.29
5,983,292.422
616,130.769
0.60
4,778.51
10,798.34
89.85
355.19
5,087.72
5,002.92
4,170.06
-2,697.50
5,983,388.947
616,122.029
1.12
4,871.02
10,894.99
89.39
355.72
5,088.36
5,003.56
4,266.40
-2,705.16
5,983,485.149
616,112.843
0.73
4,963.39
10,989.80
89.42
357.32
5,089.34
5,004.54
4,361.03
-2,710.91
5,983,579.665
616,105.589
1.69
5,053.47
11,084.44
88.84
358.38
5,090.78
5,005.98
4,455.59
-2,714.46
5,983,674.149
616,100.539
1.28
5,142.67
11,178.84
88.84
359.39
5,092.69
5,007.89
4,549.95
-2,716.30
5,983,768.462
616,097.206
1.07
5,231.05
11,273.70
87.83
0.58
5,095.45
5,010.65
4,644.77
-2,716.32
5,983,863.259
616,095.677
1.64
5,319.19
11,368.68
88.07
1.45
5,098.84
5,014.04
4,739.67
-2,714.64
5,983,958.169
616,095.852
0.95
5,406.78
11,463.28
87.95
359.71
5,102.13
5,017.33
4,834.21
-2,713.68
5,984,052.698
616,095.309
1.84
5,494.30
11,558.26
87.86
2.25
5,105.60
5,020.80
4,929.10
-2,712.06
5,984,147.599
616,095.426
2.67
5,581.90
11,652.58
89.94
3.98
5,107.41
5,022.61
5,023.26
-2,706.94
5,984,241.815
616,099.056
2.87
5,667.53
11,747.60
91.90
4.68
5,105.89
5,021.09
5,117.99
-2,699.76
5,984,336.640
616,104.724
2.19
5,752.93
11,843.39
91.14
7.73
5,103.35
5,018.55
5,213.17
-2,689.41
5,984,431.968
616,113.561
3.28
5,837.59
11,937.42
89.80
10.54
5,102.57
5,017.77
5,305.99
-2,674.49
5,984,525.008
616,127.011
3.31
5,918.36
12,032.79
87.90
12.91
5,104.49
5,019.69
5,399.34
-2,655.11
5,984,618.646
616,144.900
3.18
5,997.98
12,127.83
85.84
16.03
5,109.68
5,024.88
5,491.22
-2,631.41
5,984,710.875
616,167.143
3.93
6,074.63
12,222.14
86.71
18.59
5,115.81
5,031.01
5,581.06
-2,603.41
5,984,801.140
616,193.712
2.86
6,147.80
12,315.65
86.75
20.21
5,121.14
5,036.34
5,669.11
-2,572.40
5,984,889.668
616,223.317
1.73
6,218.21
12,412.32
85.43
22.58
5,127.73
5,042.93
5,758.90
-2,537.22
5,984,979.998
616,257.063
2.80
6,288.69
12,444.95
83.85
21.47
5,130.78
5,045.98
5,789.02
-2,525.04
5,985,010.300
616,268.766
5.91
6,312.19
12,478.64
82.15
20.78
5,134.89
5,050.09
5,820.21
-2,512.99
5,985,041.675
616,280.320
5.44
6,336.74
12,506.56
81.09
20.17
5,138.96
5,054.16
5,846.08
-2,503.33
5,985,067.699
616,289.569
4.37
6,357.22
12,539.23
78.77
19.55
5,144.67
5,059.87
5,876.33
-2,492.40
5,985,098.117
616,300.015
7.34
6,381.31
12,571.48
77.54
19.06
5,151.29
5,066.49
5,906.12
-2,481.96
5,985,128.064
616,309.975
4.09
6,405.15
12,602.09
75.88
18.95
5,158.32
5,073.52
5,934.29
-2,472.26
5,985,156.378
616,319.227
5.43
6,427.75
12,635.17
73.84
18.99
5,166.96
5,082.16
5,964.48
-2,461.88
5,985,186.732
616,329.125
6.17
6,451.99
12,665.96
71.97
19.12
5,176.01
5,091.21
5,992.30
-2,452.27
5,985,214.694
616,338.289
6.09
6,474.30
11/18/2019 3:20:45PM Page 9 COMPASS 5000.15 Build 90
BP
by
Final Survey Report Baker
Hughes
Company: North America
- ALASKA - BP
Project: PBU
Local Coordinate Reference:
Site: S
Well: S-202
Wellbore: S -202L1
TVD Reference:
Design: S -202L1
Survey
MD Inc
MD Reference:
(usft) (°)
12,696.44
70.46
12,729.16
69.85
12,777.00
69.85
Projection to TD
Design Annotations
Survey Calculation Method:
Measured
Vertical
Depth
Depth
(usft)
(usft)
12,777.00
5,213.42
Local Coordinates
+N/ -S +E/ -W
(usft) (usft) Comment
6,090.77 -2,417.16 Projection to TD
11/18/2019 3:20:45PM Page 10 COMPASS 5000.15 Build 90
Local Coordinate Reference:
Well S-202
TVD Reference:
ACTUAL KB P272 @ 84.80usft
MD Reference:
ACTUAL KB P272 @ 84.80usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Azi TVD
TVDSS
NIS
E/W Northing
Easting DLeg
V. Sec
(°) (usft)
(usft)
(usft)
(usft) (usft)
(usft) (°/100usft)
(usft)
19.61 5,185.83
5,101.03
6,019.52
-2,442.71 5,985,242.064
616,347.423 5.18
6,496.07
19.76 5,196.94
5,112.14
6,048.50
-2,432.34 5,985,271.200
616,357.328 1.91
6,519.18
19.76 5,213.42
5,128.62
6,090.77
-2,417.16 5,985,313.700
616,371.838 0.00
6,552.87
Local Coordinates
+N/ -S +E/ -W
(usft) (usft) Comment
6,090.77 -2,417.16 Projection to TD
11/18/2019 3:20:45PM Page 10 COMPASS 5000.15 Build 90
AOGCC - Offsets within 500ft
Easting (2000 usft/in)
Bakery ..<
Hughes
610000 611000 612000 613000 614000 615000 616000 617000 618000 619000 620000 621000 6 2200 0 623000 624000 625000 626000
S-102 S-122 I
j S -122P62 i I
5-122PB3 " 1Q° - - S-122PB1
59870006 ,
- 5987000
S-20OA °,202' S 20 11 S*2021-2' S-2020
S- 02L
5986000 ------ - O _ 5-2021-2
10 _ 60 —j 5986000
S-03 °O _ _ _ -S-2021-3
102P
1 - - - - j S -15P131
5985000
- — _. - ° - - - S 2021- - - S-15 - - + 5985000
S -13A
p y0p0 5-20 - 5-16
S-202 4 9000
c 5984000 - - S -44A — �_ 1 110000 8000 — - - - — 5984000 Z
NKUPST o
8000
�.
0 5983000 - - - O — - 408(1 _1_.. - 5983000ta
0_ 5-401 ®® O 700 o
0
0) 0°° 70 0 0
� O
0 5982000 - X000 Op_2 p®pO6p -- - �- - 5982000 C
Z S-01 C o ��
Z) 20 130 n 6 00 00
9
5981000 03 o0
5981000
801 0 1
o v Op I
S-01 A 01 0
5980000 S-171 -5 O — - 5980000
Q, 0 17CPB1 `T' S-1 P131 0
Q) o S-288 S-17CA32- -
co o S -28A S -135P81 O' S-218
5979000 o ` -I 0 _._......_
L - OpO � 5979000
5-126 0 0o A o 5-18
o� o
CD 600 0 0 �0 0 h00 'O° S-02 "_ 5-27
O
5978000 5978000
S I128PB2 O S-40
0 op0 2 p0 0 _ S_29
610000 611000 612000 613000 614000 615000 61600 81 61 lbs $ 19000 620000 621000 622000 623000 624000 625000 626000
Easting (2000 usft/in)
Project: SBU
Up
REFERENCE INFORMATION
Site: S
Parent Wellbore: S-2021-1
Coordinate (WE) Reference: Well 5-202, True North
Well: S-20:
Northing: 5979262.560
Tie on MD: 6848.25
Wellbore: S-20:
Easting: 618885.120
Design: S-20:
AOGCC - Offsets within 500ft
Easting (2000 usft/in)
Bakery ..<
Hughes
610000 611000 612000 613000 614000 615000 616000 617000 618000 619000 620000 621000 6 2200 0 623000 624000 625000 626000
S-102 S-122 I
j S -122P62 i I
5-122PB3 " 1Q° - - S-122PB1
59870006 ,
- 5987000
S-20OA °,202' S 20 11 S*2021-2' S-2020
S- 02L
5986000 ------ - O _ 5-2021-2
10 _ 60 —j 5986000
S-03 °O _ _ _ -S-2021-3
102P
1 - - - - j S -15P131
5985000
- — _. - ° - - - S 2021- - - S-15 - - + 5985000
S -13A
p y0p0 5-20 - 5-16
S-202 4 9000
c 5984000 - - S -44A — �_ 1 110000 8000 — - - - — 5984000 Z
NKUPST o
8000
�.
0 5983000 - - - O — - 408(1 _1_.. - 5983000ta
0_ 5-401 ®® O 700 o
0
0) 0°° 70 0 0
� O
0 5982000 - X000 Op_2 p®pO6p -- - �- - 5982000 C
Z S-01 C o ��
Z) 20 130 n 6 00 00
9
5981000 03 o0
5981000
801 0 1
o v Op I
S-01 A 01 0
5980000 S-171 -5 O — - 5980000
Q, 0 17CPB1 `T' S-1 P131 0
Q) o S-288 S-17CA32- -
co o S -28A S -135P81 O' S-218
5979000 o ` -I 0 _._......_
L - OpO � 5979000
5-126 0 0o A o 5-18
o� o
CD 600 0 0 �0 0 h00 'O° S-02 "_ 5-27
O
5978000 5978000
S I128PB2 O S-40
0 op0 2 p0 0 _ S_29
610000 611000 612000 613000 614000 615000 61600 81 61 lbs $ 19000 620000 621000 622000 623000 624000 625000 626000
Easting (2000 usft/in)
WELL DETAILS: S-202
WELLBORE DETAILS: S-202
REFERENCE INFORMATION
Ground Level: 37.90
Parent Wellbore: S-2021-1
Coordinate (WE) Reference: Well 5-202, True North
Northing: 5979262.560
Tie on MD: 6848.25
Vertical (TVD) Reference: ACTUAL KB P272 @ 84.80usft
Easting: 618885.120
Section (VS) Reference: Slot -IO.00N, 0.00E
Latittude: 70" 21' 7.196 N
Measured Depth Reference: ACTUAAL KB P272 84.80usft
Longitude: 149" 2' 4.867 W
Calculation Method: Minimum Curvature
AOGCC - Offsets within 500ft
Easting (2000 usft/in)
Bakery ..<
Hughes
610000 611000 612000 613000 614000 615000 616000 617000 618000 619000 620000 621000 6 2200 0 623000 624000 625000 626000
S-102 S-122 I
j S -122P62 i I
5-122PB3 " 1Q° - - S-122PB1
59870006 ,
- 5987000
S-20OA °,202' S 20 11 S*2021-2' S-2020
S- 02L
5986000 ------ - O _ 5-2021-2
10 _ 60 —j 5986000
S-03 °O _ _ _ -S-2021-3
102P
1 - - - - j S -15P131
5985000
- — _. - ° - - - S 2021- - - S-15 - - + 5985000
S -13A
p y0p0 5-20 - 5-16
S-202 4 9000
c 5984000 - - S -44A — �_ 1 110000 8000 — - - - — 5984000 Z
NKUPST o
8000
�.
0 5983000 - - - O — - 408(1 _1_.. - 5983000ta
0_ 5-401 ®® O 700 o
0
0) 0°° 70 0 0
� O
0 5982000 - X000 Op_2 p®pO6p -- - �- - 5982000 C
Z S-01 C o ��
Z) 20 130 n 6 00 00
9
5981000 03 o0
5981000
801 0 1
o v Op I
S-01 A 01 0
5980000 S-171 -5 O — - 5980000
Q, 0 17CPB1 `T' S-1 P131 0
Q) o S-288 S-17CA32- -
co o S -28A S -135P81 O' S-218
5979000 o ` -I 0 _._......_
L - OpO � 5979000
5-126 0 0o A o 5-18
o� o
CD 600 0 0 �0 0 h00 'O° S-02 "_ 5-27
O
5978000 5978000
S I128PB2 O S-40
0 op0 2 p0 0 _ S_29
610000 611000 612000 613000 614000 615000 61600 81 61 lbs $ 19000 620000 621000 622000 623000 624000 625000 626000
Easting (2000 usft/in)
Obp
North America - ALASKA - BP
PBU
S
S-202
S -202L1
S -202L1
500292364760
AOGCC Offset Well Report
19 November, 2019
Baker
Hughes,
♦�
S-2021-1
bp
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
.�'
MD Interval 25.00usft Error Model: ISCWSA
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
S -202L1
Reference Design:
S-2021-1
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
ACTUAL KB P272 @ 84.80usft
ACTUAL KB P272 @ 84.80usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Baker
Hughes
Reference
S-2021-1
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
Unlimited Scan Method: Tray. Cylinder North
Results Limited by:
Maximum centre distance of 500 Error Surface: Pedal Curve
Survey Program
Date 11/19/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
98.76
1,457.62 Survey #1 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
1,515.57
3,039.76 Survey #2 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
3,078.60
3,078.60 Survey #3 (S -202L1)
GYRO -WD -SS
Gyro while drilling single shots
3,172.96
6,729.26 Survey #4 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
6,786.12
12,777.00 Survey #5 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
11/19/2019 12:14:59PM Page 2 of 4 COMPASS 5000.15 Build 90
ek+00, BP
r
P Anticollision Report Baker s
��* Hughes
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
ACTUAL K8 P272 @ 84.80usft
Reference Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
S -202L1
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-2021-1
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
BEECH
EX NKUPST
HURLST
Plans: Gwydyr Development (SHL)
S
S-01 - 5-01 - S-01
7,170.90
5,675.00
293.64
S-01 - S-01 A- S-01 A
7,170.90
5,675.00
293.64
S-01 - S-01 B- S-01 B
7,169.24
5,675.00
292.89
5-01 - S-01 C- S-01 C
7,169.24
5,675.00
292.89
S-02 - IGNORE ME - Plan 3
4,975.06
5,075.00
464.39
S-02 - 5-02 - S-02
4,974.96
5,075.00
464.38
S-02 - S -02A - S -02A
4,975.12
5,075.00
464.40
S-02 - S-02ALl - S-02ALl
4,975.12
5,075.00
464.40
S-02 - S-02ALl PB1 - S-02AL1 P131
4,975.12
5,075.00
464.40
S-02 - S-02APB1 - S-02APB1
4,975.12
5,075.00
464.40
S-03 - S-03 - S-03
9,009.87
6,600.00
412.10
S-115 - S-115 - S-115
8,224.62
5,675.00
289.58
5-118 - S-118 - S-118
6,297.25
5,500.00
176.54
S-126 - S-126 - S-126
542.73
525.00
112.68
S-128 - S-128 - S-128
593.23
575.00
165.20
S-128 - S-128PB1 - S-128PB1
486.56
468.00
160.96
S-128 - S-128PB2 - 5-128PB2
593.23
575.00
164.84
5-134 - S-134 - S-134
1,258.58
1,250.00
108.02
S-135 - S-135 - S-135
225.31
225.00
32.81
S-135 - 5-135P81 - S-135PB1
225.31
225.00
32.81
5-135 - S-135PB2 - S -135P62
225.31
225.00
32.81
S-15 - S-15 - S-15
738.44
725.00
231.57
S-15 - S-15PB1 - S-15PB1
738.44
725.00
231.57
S-16 - S-16 - S-16
741.23
725.00
125.58
S-16 - S-16PB1 - S-16PB1
741.23
725.00
125.58
S-17 - 5-17 - 5-17
667.27
650.00
13.48
S-17 - S -17A - S -17A
667.27
650.00
13.48
S-17 - S-17AL1 - S-17AL1
667.27
650.00
13.48
5-17 - S-17AL1 PB1 - S-17AL1 PB1
667.27
650.00
13.48
S-17 - S-17APB1 - S-17APB1
667.27
650.00
13.48
S-17 - S -17B - S-176
667.27
650.00
13.48
5-17 - S -17C - S -17C
667.27
650.00
13.48
S-17 - S-17CPB1 - S-17CP61
667.27
650.00
13.48
S-17 - S-17CP62 - S-17CPB2
667.27
650.00
13.48
S-18 - S-18 - S-18
634.48
625.00
96.48
S-18 - S -18A - S -18A
637.51
625.00
96.55
S-18 - S-1813 - S-1 8B
637.51
625.00
96.55
5-200 - S -200A - S -200A
10,975.13
7,525.00
479.07
S-202 - 5-202 - 5-202
12,672.78
12,641.00
60.68
S-202 - S-2021-2 - S-2021-2
12,735.69
12,675.00
83.49
S-202 - S-2021-3 - 5-2021-3
9,476.11
9,450.00
55.03
S-202 - S-2021-4 - S-2021-4
11,515.20
11,506.00
118.84
S-214 - PLAN S-214 - NB - S-214 WP09 NB
956.01
950.00
30.44
5-214 - PLAN 5-2141-1 - OBD - S-21411 WP09 - OBD
956.01
950.00
30.44
S-214 - PLAN S-2141-1-01 - OBB - S-2141-1-01 WP09 OBB
956.01
950.00
30.44
S-214 - PLAN S-2141-1-02 - OBC - S-2141-1-02 WP09 - OBC
956.01
950.00
30.44
11/19/2019 12:14:59PM Page 3 of 4 COMPASS 5000.15 Build 90
Summary
Reference
BP
Centre to
bpAnticollision
Measured
Report
Centre
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
ND Reference:
ACTUAL KB P272 @ 84.80usft
Reference Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
S-2021-1
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-2021-1
Offset ND Reference:
Offset Datum
Summary
Baker
Hughes
11119/2019 12:14:59PM Page 4 of 4 COMPASS 5000.15 Build 90
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
S
S-214 - PLAN S-2141-2 - OBA- 5-21412 WP09 - OBA
956.01
950.00
30.44
5-214 - PLAN S-2141-3 - OA - 5-2141-3 WP09 - OA
956.01
950.00
30.44
S-215 - S-215 - S-215
1,461.83
1,475.00
221.25
S-217 - S-217 - 5-217
909.87
900.00
53.86
5-218 - S-218 - S-218
1,086.84
1,075.00
28.16
S-27 - S-27 - S-27
5,145.16
5,250.00
457.31
5-27 - S -27A - S -27A
5,145.16
5,250.00
457.31
S-27 - S-27APB1 - S-27APB1
5,145.16
5,250.00
457.31
S-27 - S -27B - S -27B
5,145.01
5,250.00
457.30
S-28 - S-28 - S-28
5,661.00
5,375.00
160.68
5-28 - S -28A - S -28A
5,661.00
5,375.00
160.68
S-28 - S-286 - S -28B
5,661.40
5,375.00
160.56
S-28 - S-28BPB1 - S -286P61
5,661.40
5,375.00
160.56
S-29 - S-29 - S-29
3,956.25
4,350.00
314.36
S-29 - S -29A - S -29A
3,953.48
4,350.00
314.36
5-29 - S-29ALl - S-29AL1
3,953.48
4,350.00
314.36
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown) - Plan S -40B v3.0
46.90
46.60
17.48
(Kodiak Brown)
S-40 - S-40 - 5-40
891.75
875.00
18.57
S-40 - S -40A - S -40A
891.75
875.00
18.57
S-44 - S -44A - S -44A
8,347.02
6,100.00
472.36
Baker
Hughes
11119/2019 12:14:59PM Page 4 of 4 COMPASS 5000.15 Build 90
THE STATE
JALASKA
GOVERNOR MIKE DUNLEAVY
Kenneth Allen
Engineering Team Lead
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
Re: Prudhoe Bay Field, Schrader Bluff Oil Pool, PBU S -202L1
BP Exploration (Alaska), Inc.
Permit to Drill Number: 219-121
Surface Location: 3060' FSL, 4567' FEL, SEC. 35, T12N, R12E, UM
Bottomhole Location: 4027' FSL, 1636' FEL, SEC. 27, T12N, R12E, UM
Dear Mr. Allen:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the permit to drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 219-120, API No. 50-029-23647-
00-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely, r
ssie L. Chmielowski
Commissioner
DATED this 19 -day of September, 2019.
STATE OF ALASKA
kLASKA OIL AND GAS CONSERVATION COMMIS, J
PERMIT TO DRILL
20 AAC 25.005
s
1a. Type of Work:1b.
Proposed Well Class: Exploratory - Gas ❑ Service - WAG ElService - Disp❑
1c. Specify if well is proposed for:
Drill ❑ Lateral 0
Stratigraphic Test ❑ Development - Oil 0 Service - Winj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 Single Well ❑
11 Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU S-2021_1
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 13000' TVD: 5163'
PRUDHOE BAY, SCHRADER
BLUFF OIL `
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
AdL 028257 & 028258
Surface: 3060' FSL, 4567' FEL, Sec. 35, T12N, R12E, UM
g DNR Approval Number:
13. Approximate spud date:
Top of Productive Horizon: 3009' FSL, 5168' FEL, Sec. 35, T12N, R12E, UM
83-47
October 10, 2019
9. Acres in Property: 2560
14. Distance to Nearest Property:
Total Depth: 4072' FSL, 1636' FEL, Sec. 27, T12N, R12E, UM
2000
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 78.28 feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 618885 y- 5979263 Zone - ASP 4
GIL Elevation above MSL: 37.9 feet
1900 �
16. Deviated wells: Kickoff Depth: 6977 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees
Downhole: 3611 Surface: 2719
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade Coupling Length
MD TVD MD TVD (including stage data)
42^ 20" x 34" 215.5# A-53 115'
Surface Surface 115' 115' 60 sx Arctic Set (Aoorox.)
13-3/2" 10-3/4" 45.5# L-80 Vam 21 3130'
Surface Surface 3130' 2887' x LiteCrete, sx Class'G'
9-7/8" 7-5/8" 29.7# L-80 VamTop HC 6741'
Surface Surface 6741' 5274' sx Class 'G'
6-3/4" 4-1/2" 12.6# L-80 DWC 5703'
7297' 5188' 13000' 5163' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
Casing Length Size Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes ❑ No ❑
20. Attachments Property Plat 0 BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch 0 Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements
21' Verbal Approval: Commission Representative: Date
hereby certify a e toregoing is true and the procedure approved herein will not be deviated Contact Name Gorham, Bradley M
from without prior written approval.
Authorized Name Allen, Kenneth W Contact Email Bradley Gorham@bp.com
Authorized Title Engineering Team Lead Contact Phone 907-564-4649
Authorized Signature �" Date
V�6
Commission Use OnIv
Permit to Drillu
API: 50-oZ9-"aZ36%+ —' 0-00
Permit Approval
See cover letter for other
I
Number:
D
requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydra es, or gas contained in shales:
Other: Ion Q Q La T—&—$—r TO 3 Samples req'd: Yes ❑ No P/ Mud log req'd: Yes No t!!'
—❑ `
/
Vo"v1 a -*r +o 20 44C ZyS.G3a`�, H2S measures Yes V No Q Directional svy req'd: Yes LAY No ❑
-e- /
CO -1 U %res5 % 1114EAj 0� !" r Spacing exce1ption req'd: Yes ,❑, J�/t No 1_9/ Inclination -only svy req'd: Yes ❑ No 0-11
��
C_ a yy� Lo y�, �—� Ir&p"o �"�'- 7'? �" T. 6 VY�( �C��sC Post initial injection MIT req'd: Yes ❑ No ❑
1
APPROVED BY
Approved by:COMMISSIONER THE COMMISSION Date:
ORIGINALForm 10-401 Revised 5/2017 This permit is valid for 24 months from thval (20 AAC 25.005(g)) Submit Form and
Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Brad Gorham, ODE
Date: September 3, 2019
RE: S-202 Permit to Drill
The S-202 well is scheduled to be drilled by Parker 272 in October 2019. This grassroots well is a
horizontal mulit-lat producer targeting the Schrader Bluff sands. The planned well is a penti-lat,
slimhole design using a 10-3/4" surface casing, 7-5/8" intermediate casing, and 4-1/2" production
liners. The surface casing will be set in the SV3 shale. The intermediate casing will be set in the OBd,
and the production intervals will be completed with slotted liners.
The maximum anticipated surface pressure from the Schrader Bluff with a full column of gas from TD
to surface is 1,848 psi (assumes 8.6 ppg EMW most likely pore pressure and a 0.1 psi/ft gas
gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3
rams and an annular). The BOP rams and annular will be tested to 3,500 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on S-202, please do not hesitate to use the contact
information below.
Brad Gorham Office: (907) 564-4649 Cell: (907) 250-3209 Email: Bradley.gorham(a bp.com
Attachments:
Well Bore Schematic Diverter Line Layout Diagram
Directional Package As -Staked Survey
BOPE Schematic
S-202 PTD 1 9/3/2019
Planned Well Summary
Well S-202 Well Producer Target Schrader
Type Ob ective Bluff
Current Status Grass Roots Well
Estimated Start Date: 1 10/10/ 1 Time to Complete: 1 67.2 Da s
Surface
Northing
Eastin
= Offsets
I TRS
Location
5,979,262.30
618,885
1 3060' FSL / 4567' FEL
I 12N 12E Sec 35
OBd — S-202
OBb Lateral 1
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,980,141
617,592
5,150
3958' FSL / 565' FEL
12N 12E Sec 34
TD
5,985,530
616,425
5,193
4086' FSL / 1639' FEL
12N 12E Sec 27
OBb Lateral 1
OBc Lateral 2
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,918
617,755
5,186
3733' FSL / 406' FEL
12N 12E Sec 34
TD
5,985,517
616,429
5,084
4072' FSL / 1636' FEL
12N 12E Sec 27
OBc Lateral 2
OBa Lateral 3
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,980,407
617,399
5,094
4227' FSL / 754' FEL
12N 12E Sec 34
TD
5,985,559
616,531
5,133
4113' FSL / 1533' FEL
12N 12E Sec 27
OBa Lateral 3
S-202 PTD 2 9/3/2019
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,583
618,021
5,063
3394' FSL / 146' FEL
12N 12E Sec 34
TD
5,985,587
616,516
5,066
4141' FSL / 1547' FEL
12N 12E Sec 27
S-202 PTD 2 9/3/2019
OA Lateral 4
OBd - S-202
Planned KOP: 610' Planned 13,000' MD / 5,193' TVDss
TD:
OBb Lateral 1
Planned KOP: 6977' Planned 13TD: ,000' MD / 5,084' TVDss
OBc Lateral 2
Planned KOP: 7297' Planned 13,000' MD / 5,133' TVDss
TD:
OBa Lateral 3
Planned KOP: 6025' Planned 13,000' MD / 5,066' TVDss
TD:
OA Lateral 4
Planned KOP: 5810' Planned 13,000' MD / 5,020' TVDss
_F TD:
Rig: Parker 272 GL -RT: 38.28 RTE ref MSL : 78.28
Directional - BHGE WP08
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,366
618,218
5,037
3174' FSL / 5232' FEL
12N 12E Sec 35
TD
5,985,633
616,598
5,020
4185' FSL / 1465' FEL
12N 12E Sec 27
OBd - S-202
Planned KOP: 610' Planned 13,000' MD / 5,193' TVDss
TD:
OBb Lateral 1
Planned KOP: 6977' Planned 13TD: ,000' MD / 5,084' TVDss
OBc Lateral 2
Planned KOP: 7297' Planned 13,000' MD / 5,133' TVDss
TD:
OBa Lateral 3
Planned KOP: 6025' Planned 13,000' MD / 5,066' TVDss
TD:
OA Lateral 4
Planned KOP: 5810' Planned 13,000' MD / 5,020' TVDss
_F TD:
Rig: Parker 272 GL -RT: 38.28 RTE ref MSL : 78.28
Directional - BHGE WP08
Hydraulic Fracture Planned? No
S-202 PTD 3 9/3/2019
-43° in the surface section
-900 in the intermediate section
Production section
-1000 - OBb
Maximum Hole Angle:
-1000 - OBc
-1000 - OBd
--970 - OBa
-93° - OA
All offset wells pass BP anti -collision scan criteria, but some offsets
Close Approach Wells:
must be shut-in to pass scan criteria - reference "Surface and Anti -
Collision Issues" section.
Survey Program:
Reference attached directional program
Nearest Property Line:
2000'
Nearest Well withinPool:
-1,900'
Hydraulic Fracture Planned? No
S-202 PTD 3 9/3/2019
Formation Tops and Pore Pressure Estimate S
Formation
Estimated
Formation
Top (TVDss)
Most Likely
Pore
Pressure
(EMW ppg)
Fluid Type (For
Sands)
G1
335
8.4
SV6
1540
8.4
Gas associated with
coals
BPRF
1862
8.6
Gas associated with
coals
EOCU
2080
8.4
Gas associated with
coals
SV5
2180
8.4
Gas associated with
coals
SW
2318
8.6
Gas associated with
coals
SV3
2719
8.6
Gas Hydrates
SV2
2852
8.7
Gas Hydrates
SV1
3196
8.7
Gas Hydrates
UG4
3534
8.85
UG4A
3575
8.85
UG3
3877
8.85
Heavy Oil
UG1
4424
8.7
Heavy Oil
UG Ma
4688
8.7
Water / Heavy Oil
UG Mb1
4740
8.7
Water / Heavy Oil
UG Mb2
4750
8.7
Water / Heavy Oil
UG Mc
4783
8.7
Water/ Heavy Oil
SB Na
4920
8.7
Water/ Heavy Oil
SB Nb
4939
8.7
Viscous Oil
SB OA
5047
7.7
Viscous Oil
SB OBa
5082
7.7
Viscous Oil
SB OBb
5107
7.7
Viscous Oil
SB OBc
5143
7.7
Viscous Oil
SB OBd
5173
7.7
Viscous Oil
SB OBe
5245
8.6
SB OBf
5290
8.6
SB OBf Base
5325
8.6
S-202 PTD 4 9/3/2019
Casing/Tubing Program
OBd - S-202
Hole Size
Casing /
Wt/Ft
Grade
Conn
Length
Top
Bottom
(Ib/100ft2)
Tbg O.D.
8.5-9.1
6-20
35-80
lateral
MD / TVDss
MD / TVDss
42"
20" x 34"
215.5#
A-53
-
115'
Surface
115'/ 115'
13-1/2"
10-3/4"
45.5#
L-80
Vam 21
3,130'
Surface
3,130'/ 2,809'
9-7/8"
7-5/8"
29.7#
L-80
VarnTop HC
6,741'
Surface
6,741'/ 5,196'
6-3/4"
4-1/2"
12.6#
L-80
DWC
6,259'
6,109'/ 5,093'
13,000'/ 5,193'
150' lap
Tubing
4-1/2"
12.6#
13Cr
Vam Top
5,665'
Surface
5,665' / 4,921'
-5' into liner TBS)
OBb - Lateral 1
6-3/4" 4-1/2" 12.6# L-80 DWC 5,703' 7,297'/ 5,110' 13,000'/ 5,084'
OBc - Lateral 2
6-3/4" 4-1/2" 12.6# L-80 DWC 6,023' 6,977'/ 5,166' 13,000'/ 5,133'
OBa - Lateral 3
6-3/4" 4-1/2" 12.6# L-80 DWC 6,975' 6,025'/ 5,068' 13,000' / 5,066'
OA - Lateral 4
6-3/4" 4-1/2" 12.6# L-80 DWC 7,190' 5,810' / 4,984' 13,000'/ 5,020'
Mud Program
Surface Mud Properties: MMH
Depth Interval
�PPg�y
PV (cp)
YP
10-3/4" Shoe - TD
1 9.1 -9.5
1 10-20
(Ib/100ft2)
Surface - 13-1/2" TD
8.5-9.1
6-20
35-80
Intermediate Mud Properties: LSND
Depth Interval
Density
PV (cp)
YP
Ib/100ft2
10-3/4" Shoe - TD
1 9.1 -9.5
1 10-20
20-30
Production Mud Properties: Water Based Fluid
Depth Interval
Density
PV (cp)
YP
Ib/
7-5/8" Shoe - TD of each
lateral
8.9-9.4
<12
12-20
L3 O.W-C/
<: O -C)
S-202 PTD 5 9/3/2019
Logging Program
Surface I Sample Catchers - not required for surface hole
Drilling: Dir/GR/RES
Oen Hole: None
Cased Hole: None
Intermediate Sample Catchers - as required by Geology
Drilling: Dir/GR/RES/DEN/NEU/AZIMUTHAL DENSITY
Oen Hole: None
Cased Hole: None
Production ample Catchers - as required by Geology
Drilling: Dir/GR/RES/DEN/NEU/AZIMUTHAL DENSITY
Oen Hole: None
Cased Hole: None
Cement Program
Surface
Lead
Oen hole volume + 350% excess in permafrost and 40% excess below permafrost
Lead TOC
Target surface
Basis
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
500 ft MD above casing shoe
Spacer
-100 bbls of Viscosified Spacer weighted to -10.0 Mud Push 11
Total Cement
Lead
632.2 bbls, 3549 cuft, 1858 sks of 11.0 ppq LiteCRETE - 1.91 cuft/sk V
Volume
Tail
53 bbls, 298 tuft, 255 sks 15.8 ppg Class G - 1.17 cuft/sk
Temp
BHST 55° F
Intermediate
Lead
N/A
Lead TOC
N/A
Basis
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
1500' above Schrader Bluff formation
Spacer
-40 bbls of Viscosified Spacer weighted to -12.50 Mud Push II
Total Cement
Lead
N/A
Volume
Tail
142 bbls, 798 cuft, 687 sks 15.8 ppg Class G - 1.16 cuft/sk ✓
Temp
BHST 94° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Sub -Surface Pressure Management:
The following wells will be shut-in for reservoir pressure purposes while drilling:
• S-201
Anti -Collision:
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling ✓
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling ✓
Offset Well Ownership Information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP.
S-202 PTD 6 9/3/2019
Hydrogen Sulfide
Reference "Drilling Critical Issues" section.
Faults
Reference "Drilling Critical Issues" section.
Drilling Waste Disposal
• There is no annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
S-202 PTD 7 9/3/2019
Well Control
The13-1/2" surface hole will be drilled with a diverter (see attached diverter layout). The 9-7/8" hole and
6-3/4" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure
rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface
pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi.
BOP test frequency for S-202 will be 14 days with function test every 7 days. Except in the event
of a significant operational issue that may affect well integrity or pose safety concerns, an
extension to the 14 day BOP test period should not be requested.
9-7/8" Intermediate Interval
Maximum anticipated BHP
2,381 psi in the SB at 5,325' TVDss 8.6 ppg EMW
Maximum surface pressure
1,848 psi in the SB 0.10psi/ft gas gradient to surface
25 bbls with 11.80 ppg frac gradient.
Kick tolerance
Assumes 8.6 ppg pore pressure in the SB + 0.5 ppg kick
intensity and 9.30 ppg MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Integrity Test — 9-7/8" hole
LOT after drilling 20'-50' of new hole
7-5/8" Casing Test
3,500 psi surface pressure
6-3/4" Production Interval
The base plan is to not conduct the production hole FIT's. See Variance request 2.
S-202 PTD 8 9/3/2019
Variance Requests
1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling
surface hole, it is requested to drill without a flow paddle for the first portion of the surface
hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in
the flow line (<1000 ft). This is a variance from 20 AAC 25.033.
Procedures/Safeguards with paddle removed:
• Fluid levels will be monitored in the pits for both gains and losses while drilling.
Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred.
• The well will be monitored for flow when the pumps are off at each connection.
• The planned 8.6 — 9.1 ppg fluid will provide over balance to formation fluid.
Given that the planned depth of the intermediate casing is in the target reservoir (Schrader
Bluf), and all of the planned production laterals do not depart from the Schrader Bluff
formation, it is requested to forgo the planned FIT's for the production hole intervals.
a. Please note that if there are any issues during the intermediate cement job (ie.losses)
which would result in not meeting AOGCC or BP cement requirements, or there is u -
tube upon drilling out the shoe — this varince will not apply.
b, h oGGG V tv i FkI OF- 17-`4.7 4 C e� ye t -i- .10 1
a PP tea} C6C *-o Ge < V O -V r 4LK'C- AWL at.T V-0 ac�1
1--6 Za A A -c 2. , c3-66)
S-202 PTD 9 9/3/2019
S-202 SB Multi-lat operations Summary
Pre -Rin Work:
1. Install a 20" conductor and landing ring and obtain survey of conductor location.
Drilling Riq Operations:
1. MIRU Parker 272. J
2. Nipple up diverter system and function test. PU 5" DP and stand back in derrick.
3. MU 13-1/2" drilling assembly directionally drill surface hole to 10-3/4" casing point within the SV3
(3,130' MD).
4. Run and cement the 10-3/4" surface casing back to surface.
5. Nipple down diverter and nipple up wellhead. Nipple up BOPE and test to 3,500 psi. Top to T
bottom: annular preventer, 7-5/8" rams, blind/shear, mud cross, 2-7/8" x 5" VBR.
6. Pressure test 10-3/4" casing to 3,500 psi.
7. MU 9-7/8" directional drilling assembly on 5" DP.
8. Displace the well to LSND drilling fluid. I -t
9. Drill out the float equipment and 20' of new formation. Perform a LOT. 4�i-A�-I.DT-s r►fSY'
10. Drill to TD in the OBd.
11. Circulate and condition the hole as needed. Perform short trip if deemed necessary. POOH.
12. MU and run 7-5/8" casing to TD and cement...-�
13. Pressure test 7-5/8" casing to 3,500 psi. �ay- �T � r�a.we e 5241 vdr3i-.
14. Install and test 7-5/8" pack -off. e -ro C_ oe Z,S; a,3p�
15. Initiate injection into OA to ensure annulus is open for future freeze protection.
16. Swap upper rams to 2-7/8" x 5" VBR's and test.
17. PU 6-3/4" drilling assembly and RIH to the float collar.
18. Displace well over to reservoir drilling fluid system.
19. Flowcheck for 15 minutes. 2S �Q
20. Drill out shoe track, circulate and condition mud. Drill 20' of new formation.
21. Flowcheck for 15 minutes and perform FIT. FIT will not be conducted, if variance a roval is
granted, unless there are issues during the cement job and/or there is U-tube upon drilling out the
shoe then this variance will not apply.
22. Directionally drill ahead to TD geo-steering through the OBb to TD.
23. Circulate and condition the hole as needed. Perform short trip if deemed necessary. POOH.
24. MU and run 4-1/2" slotted liner with aluminum billet liner top. Position billet in a tangent section in
preparation for OBc sidetrack. POOH.
25. RIH with 6-3/4" drilling assembly with to aluminium billet. Trench lowside for sidetrack and time
drill off billet for OBc lateral.
26. Directionally drill to the planned TD in the OBc. Circulate and condition mud and POOH.
Contingency: Perform short trip and ensure BHA travels smoothly past aluminium billet, both in
and out of the hole.
27. MU and run 4-1/2" slotted liner with an aluminium billet liner top. Position billet in a tangent
section in preparation for OBd sidetrack. POOH.
28. RIH with 6-3/4" sidetracking / drilling assembly with MWD/GR/Res/Den/Neu to aluminium billet.
Trench lowside for sidetrack and time drill off billet for OBd lateral.
29. Directionally drill ahead to TD geo-steering through the OBd to TD. Contingency: Perform short
trip and ensure BHA travels smoothly past aluminum billet, both in and out of the hole.
30. MU and run 4-1/2" slotted liner with liner hanger and liner top packer. POOH.
S-202 PTD 10 9/3/2019
31. PU the 7-5/8" whipstock assembly. Set the whipstock in position to drill the OBa lateral. Orient
and set whipstock. Shear off the whipstock, mill window and POOH.
32. RIH with 6-3/4" drilling assembly with to whipstock. Directionally drill to the planned TD of OBa
lateral. Circulate and condition mud. Contingency: Perform short trip and POOH.
33. Pull whipstock #1. Run and set 4-1/2" slotted liner and hook hanger. POOH and LD liner running
string. Run Baker Lateral Entry Module #1 with ZXP liner top packer. POOH.
34. PU the 7-5/8" whipstock assembly. Set the whipstock in position to drill the OA lateral. Orient
and set whipstock. Shear off the whipstock, mill window and POOH.
35. RIH with 6-3/4" drilling assembly with to whipstock. Directionally drill to the planned TD of the OA
lateral. Circulate and condition mud. Contingency: Perform short trip and POOH.
36. Pull whipstock #2. Run and set 4-1/2" slotted liner and hook hanger. POOH and LD liner running
string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. POOH.
37. MU 4-1/2", L-80 completion assembly and RIH, tag up in PBR, space out and land tubing hanger.
38. Drop ball & rod and set production packer. Individually test tubing and IA to 3,500 psi each.
39. Shear DCK valve. Reverse circulate diesel freeze protection. Allow diesel to U-tube so that T x IA
is freeze protected down to —2000' TVD.
40. Install and test TWC and test from above and below to 3,500 psi.
41. Nipple down BOPE. Nipple up adapter flange and dry hole tree and test each to 4,500 psi.
42. Secure well and RDMO
Post -Rig Work:
• V: Tree work/pull BPV
• S: Pull B&R/LGLV's/SBHP
• T: Flowback
S-202 PTD 11 9/3/2019
S-202 Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hole: The UG4 and UG3 are expected to be a 8.85 ppg EMW. Formation pressures
will be controlled with a 9.1 — 9.5 ppg mud to TD.
B. Production Hole: The Schrader Bluff O sands are all expected to be at a 7.7 ppg EMW. Reservoir
pressures will be controlled by using 8.9 — 9.4 ppg water based mud.
II. Lost Circulation/Breathing
A. Production Hole: There are 2 expected fault crossings in the production hole.
III. Fault Locations
Formation Where
Fault Encountered
MD
Intersect
TVDss
Intersect
Throw Direction Uncertainty
and Ma nitude
Lost Circ
Potential
Fault 1 - OBd
6282
5165
0-15' High: >300'
Low
Fault 2 - OBd
7316
5150
15-30' High: >300'
Low
IV. Integrity Testing
Test Point Test Depth Testtype EMW (lb/gall)
10-3/4" Shoe 20'-50' from the 10-3/4" shoe LOT 11.60 ppg
7-5/8" Shoe 20'-50' from the 7-5/8" shoe FIT N/A
S-202 PTD 12 9/3/2019
V. Hydrogen Sulfide
S -Pad is considered an 1-12S site. Recent 1-12S data from the Dad is as follows:
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling
CONSULT THE S -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
S-202 PTD 13 9/3/2019
Well Name
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
S -40A
56 ppm
12/15/16
#2 Closest SHL Well H2S Level
S -17C
19 ppm
03/29/15
#1 Closest BHL Well H2S Level
S-201
180 ppm
03/09/12
#2 Closest BHL Well H2S Level
S-200
10 ppm
08/14/00
Max Recorded H2S on Pad/Facility
I S -27B 1
140 ppm
01/10/12
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling
CONSULT THE S -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
S-202 PTD 13 9/3/2019
WELLHEAD =
ACTUATOR =
I8. ELEV =--- —
B_F. ELEV =
Ntix _Angle =
Datum MD =_
Datum ND
PROPOSED S-202
REV 1 (L1, L2, L3, & L4)
10-3f4" CSG, 45.5#, L-80, D = 9.950"
Minimum ID: '
SAFETY NOTES:
4-1/2" HES X NP, D = 3.813"
17-518- X 4-1/2" BKR PRM PKR, D= 3-875" 1
4-1/2" HES X NP, D = 3.813"
4-112" HES X NI'. D = 3.813"
6660° -I7-5/8" X 5-1/2" BKR ZXP LTP/TE BK, D = 4.970"
4 19' SEAL BORE FXTFNSION, ID :-7475"
4-1 /2" TBG, 12-6#, L-80, .0152 bpf, D = 3.958" — -J4-1/2' FLUTTED WLEG, D = 3-958"
5-112" X 4-112" XO. D = 3.958"
BAKER HOOK HANGER ASSY
w / L2 SEALING LEM, D = 3.688" - - - - - - - - - - - - - - - - - - - - -, L5 (OA) LEM WINDOW
L4 (OA)
7-518" RA T AG —
- - - - - - - - - - - - - - - - - - - - -' OPENING WIDTH = 3.33"
7-518" X 5-1/2" BKR ZXP LTPMEBK, ID = 4.970"
LEM #2 LOWER SEAL ASSY, D = 3.90" —� 19 1f2' SEAL BORE EXTBJSION D = 4-75"
IBAKER HOOK HANGER ASSY I 6025°
w / L1 SEALING LEM, D = 3.688"
7-5/8" RA TAG —
LEM #1 LOWER SEAL ASSY, D = 3.88" —
7-518" CSG, 29.7#, L-80, ID = 6.875" I 6741° 1
1
I
I
I
i
I
I
I
I
'S-202
_ I (OBd}
4-1/2" SLTD LNR, 12-6#, L-80, 13000' 1
0152 bpf, ID = 3-958"
5-1/2" X 4-1/2" XO, D = 3.910"
- - - - - - - - - - - - - - - - - - - -, L4 (OBa) LEM WINDOW
U (OBa) _
- - - - - - - - - - - - - - - - - - -' -
OPENING WIDTH = 3.33"
7-5/8" X 5-1/2" BKR ZXP LTWflEBKK, D = "
.75"-19' SEAL BORE D(TI34SION, ID = 4-75-
- - - - - - - - - - - - - - - - - - - - - - -
----------------------
L1 (OBb)
1�-------------------------
7297' I 6" FLOW THRU ALUMINUM BI_LET LNR
(BEHIND SLOTTED LINER)
-----------------------
L2 (OBC)
6977' 6" FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINERI
DATE REV BY CONNEI`ITS
DATE REV BY COMMENTS
! t_ ORIGINAL COMPLETION
10/30/18 JND BLIT PROPOSED
10/31/18 BGIJMD BUILT PROPOSED REV 1
POLARIS 11MT
WELL= S-202, L1, L2, L3, L4, & L5
PERMT No:
API No -
SEC, T
o:SEC _,T 2N,R Ev'FSL&`'FWL
BP Exploration (Alaska)
CHOKE LINE
3-1/8' SM FLANGED MANUAL CATE VALVE
3-1/8' SM FLANGED HYDRAULIC GATE VALVE
3-1/8' SM FLEX HOSE
CELLAR AND WELL HEAD CONFIGURATION
ARE FOR REFERENCE ONLY k ARE
DEPENDENT ON OPERATOR'S
REQUIREMENTS
� f'Il it
NIPPLE UP:
SPACER SPOOL
13 5/8' 5M FLANGE TOP
13 5/8' SM FLANGED BOTTOM
SPACER SPOOL
13 5/8' SM FLANGE TOP
13 5/8' 5M FANGED BOTTOM
DOUBLE STUDDED ADAPTER
13 5/8' SM FANGED TOP
11' SM FLANGED BOTTOM
CASING SPOOL ASSEMBLY
11' SM FLANGED TOP
11' SM FLANGED BOTTOM
CASING HEAD ASSEMBLY
11' 5M FANGED TOP
6012 '30F STACK (DRAFT
DRILLING CROSS:
13 5/8' SM STUDDED TOP
13 5/8' SM FLANGED BOTTOM
W (2) 3 1/8' 5M SIDE OUTLETS
KILL UNE:
2-1/16' SM FLEX HOSE
2-1/16' SM X 3-1/8' SM D.S.A.
3-1/8' SM FLANGED MANUAL GATE VALVE
3-1/8' SM FLANGED HYDRAULIC GATE VALVE
RAM TYPE BOP:
13 5/8' SM NOV 6012 SINGLE BOP
13 5/8' SM STUDDED TOP
13 5/8' SM FLANGED BOTTOM
8.3.17 L.C.)
FLOWBOX BELL NIPPLE:
0/L WELL
32 DN. PIPE SEAL WELDED TO THE BOTTOM OF THE FLOWBOX
TOP OF ROTARY TABLE _
30-3 8'
d –
,, -
I
[
INNER DIA TRIPLE INFLATABLE RUBBER SEAL WELL
BOTTOM OF ROTARY BEAM
I ;
_4,j
BELL NIPPLE;
16' DIA UPPER, 18' DN LOWER
. .. �.
3' CASING FILL OUTLET (QTY OF 2)
13 5/8" 5M BOTTOM LITE RANGE
16' KEMPER SEAL—O—GRIP
(1 EA) 3' DIA STD. OUTLET
(1 EA) 2' DIA STD. OUTLET
7 11
DUTCH LOCK DOWN FLANGE
—�
ANNULAR BOP:
13-5/8' SM SHAFFER LXT
-
13-5/8' 5M STUDDED TOP
i
—IT,
13-5/8' SM FLANGED BOTTOM
P
RAM TYPE BOP:
.
13 5/8' SM NOV 6012 DOUBLE BOP
13 5/8' 5M STUDED TOP
CELLAR DECK PLATFORM
13 5/8' SM RANGED BOTTOM
_
W/ 3-1/2MANUAL LOCKS W/ 11' BOOSTER
CHOKE LINE
3-1/8' SM FLANGED MANUAL CATE VALVE
3-1/8' SM FLANGED HYDRAULIC GATE VALVE
3-1/8' SM FLEX HOSE
CELLAR AND WELL HEAD CONFIGURATION
ARE FOR REFERENCE ONLY k ARE
DEPENDENT ON OPERATOR'S
REQUIREMENTS
� f'Il it
NIPPLE UP:
SPACER SPOOL
13 5/8' 5M FLANGE TOP
13 5/8' SM FLANGED BOTTOM
SPACER SPOOL
13 5/8' SM FLANGE TOP
13 5/8' 5M FANGED BOTTOM
DOUBLE STUDDED ADAPTER
13 5/8' SM FANGED TOP
11' SM FLANGED BOTTOM
CASING SPOOL ASSEMBLY
11' SM FLANGED TOP
11' SM FLANGED BOTTOM
CASING HEAD ASSEMBLY
11' 5M FANGED TOP
6012 '30F STACK (DRAFT
DRILLING CROSS:
13 5/8' SM STUDDED TOP
13 5/8' SM FLANGED BOTTOM
W (2) 3 1/8' 5M SIDE OUTLETS
KILL UNE:
2-1/16' SM FLEX HOSE
2-1/16' SM X 3-1/8' SM D.S.A.
3-1/8' SM FLANGED MANUAL GATE VALVE
3-1/8' SM FLANGED HYDRAULIC GATE VALVE
RAM TYPE BOP:
13 5/8' SM NOV 6012 SINGLE BOP
13 5/8' SM STUDDED TOP
13 5/8' SM FLANGED BOTTOM
8.3.17 L.C.)
`1
0
}
c
w
N
s�
S �
{
4l
+
4
Y
�
q, --4 •�
[.
f
I•iii .r � t'�'
� �.
C
Ti�o
.I
um-ww+-�•.,.:+a ..uc..-,
..a a,r�ar.«u.«us..r».r.m=
u r» ry
One Map A6iska
a
c..
_ awr �•• rr.�sna.«. � e«_.
� �a.. w• aww.
M
`® �.wmer � Y:epa.
.as l.MsG'.r9r Jt: nnU. Yai nt M.
.rat lc) �}..w9:�'M9xmMLe'i N P• G e
+�
M•r•Ow•wq Ys•iTav
— Mw
�r-ssn yyW�vwp�wy`w�•�ym�h vAM
0•ay..n ViiIV P/lllV L1FD�
•w•'P`••�—•
'•
.r.••�. v .MM•�•f:I.i�.i
aM:ftf•YTMA .a ••e«]
WVI<AIMM- vr]
4.15
Iv
G+]+pt i`aa
T W.y� � � �� s�
..—......—._ .....
�
S 4Sa
90: CC] SM
KM.Y•A.Oi1Sw.nY«.�+•. .fMi.d Pw
1�p•[Fa�A.u•a• • e
�y
y�a.wa..a•+m.SLeY
%W
Notes Diverter Plan for Well L5-03
1 - This diverter vent line configuration is identical in length to previous designs.
2 - There is no change in distances to ignition sources. All dimensions remain the same.
i
■ 15
I I
■1
j 3
■7 j ��
I I �
■ SS18
■ 1281
■ 134i i — — PUNT
■ 16
■ 126i
■ 2+71 S PAD
j ■ 2181 MON. S-1
I I
I i
I �{% 1
■ 135 N6$(Oi
■ 17 45�
S-202
■ 40
I I
I I
I I
I I
I
I I
■ 18
I I
I I
S—PAD
GRAPHIC SCALE
0 50 100 200
( IN FEET )
1 inch = 100 ft.
NOTES:
LEGEND:
AS—BUILT CONDUCTOR
EXISTING CONDUCTOR
OPERATOR MONUMENT
1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. (EPSC:26734)
2. BASIS OF VERTICAL CONTROL IS S—PAD MONUMENT S-4, REFERENCE 2018 WELL
BORE SUBSIDENCE STUDY HOLDING MON. S-4 (ELEV. 38.647
3. VERTICAL DATUM IS BPXA M.S.L
4. GEODETIC POSITIONS ARE NA027. (EPSC:4267)
5. BEARINGS AND DISTANCES SHOWN ARE ALASKA STATE PLANE GRID
5. S—PAD AVERAGE SCALE FACTOR IS: 0.9999165.
6. DATE OF SURVEY. JULY 17, 2019.
7. REFERENCE FIELD BOOK: NS19-17 PP. 22-27.
8. COMPUTED RELATIVE ACCURACY (THIRD ORDER}
BASELINE DISTANCE: 1:15,502
BASELINE AZIMUTH: N/A
ALLOWABLE VERTICAL CLOSURE ±0.01'; FOUND: 0.001'
9. NAD27 COORDINATES DERIVED USING TRIMBLE BUSINESS CENTER—HCE. VER 3.92.
VICINITY MAP
NTS
ssr ooafse rfe .,s
Tiimot F. Bamhort
p 10200
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS AS—BUILT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF JULY 17, 2019.
BASIS OF COORDINATES:
HELD COORDINATES OF RECORD
S—PAD MONUMENT S-1
Y= 5,979,431.54 N= 1,400.72
X- 619,321.07 E= 1,423.66
NAD27, ASP, ZONE 4 S—PAD PLANT
DESCRIPTION: OPERATOR MONUMENT, PUNCH
MARK ON EAST END OF PIPE SUPPORT FOR
RELIEF UNE
—N—
I
LOCATED WITHIN PROTRACTED SEC. 35, T. 12 N., R. 12 E., UMIAT MERIDIAN, ALASKA
WELL
NO.
A.S.P.
COORDINATES
PLANT
COORDINATES
GEODETIC
POSITION(DMS)
GEODETIC
POSITION(D.DD)
SECTION
OFFSETS
PAD
ELEVATION
CELLAR
BOX EL.
BASE
FLANGE EL.
S-202
Y= 5,979,262.56
X= 618,885.12
N= 964.67
E= 1,592.49
70'21'07.196"
149'02'04.867"
70.3519989'
149.0346853'
3,060' FSL
4,567' FEL
38.1'
37.9'
N/A
r
DRAVft
JACOBS
p
DATE�.DRAPER
7/22/19
DRAWWG
FR819 wos o2
WOA S—PADS``
AS—BUILT CONDUCTOR LOCATION
WELL S-202
1 1
�M
AECC582
SM IL FWAXED WE
vAN.AxA 92W31'x100'
SCALL
DD MWM FDR DWORMAIM
DATE RENSIOH BY CHK
391
TREWS
DD 120 GV
tEWS
10 120 GV
REF: 00120M1078965
Oc!o ..i nolo.,,.
7 ucYna+v.v[ ■vn+vr,
LV
II -5000 COMPLETION
:,:tiw inn •,"`a,.
WITH I-WIREwct
nz-'tm
_
FOR 4%-5000 X -MAS iP.EE�
'q®,rw�stw
•oz -+z -os 41aHT
-
—. _
20 X 7% X 4%
nurn*w m-iz-a� � ••+�w.u.
nwnnw ez•u m 0012DM1078965- 2
LC}
C0
L
iN
0
0
North America - ALASKA - BP
PBU
S
S-202
PLAN S-2021-1 OBB
Plan: S-2021-1 WP08 OBB
BP Well Plan Survey Report
01 November, 2018
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point
Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
S, TR -12-12
BP
70° 21'21002 N
0 by
Map
BP Well Plan Survey Report
0.00 usft
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well:
S-202
North Reference:
True
Wellbore:
PLAN S-2021-1 OBB
Survey Calculation Method:
Minimum Curvature
Design:
S-20211 WP08 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point
Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
S, TR -12-12
Site Position:
70° 21'21002 N
From:
Map
Position Uncertainty:
0.00 usft
Well
S-202
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
PLAN S-2021-1 OBB
Magnetics
Model Name Sample Date
Wellhead Elevation:
BGGM2018 11/1/2019
Design
S-2021-1 WP08 OBB
Audit Notes:
Version:
Phase:
Vertical Section:
Depth From (TVD)
(usft)
40.00
Northing:
5,980,854.540 usft
Latitude:
70° 21'21002 N
Easting:
617,919.920 usft
Longitude:
149' 2'32+343 W
Slot Radius:
0.000 in
Grid Convergence:
0.90 °
Northing:
5,979,262.300 usft
Latitude:
700 21'7.194 N
Easting:
618,885.010 usft
Longitude:
1490 2'4,870 W
Wellhead Elevation:
38.28 usft
Ground Level:
38.28 usft
Declination Dip Angle Field Strength
C) V) (nT)
16.53 80.91 57,408
PLAN Tie On Depth: 40.00
+N/ -S +E/ -W Direction
(usft) (usft) V)
0.00 0.00 340.00
11/1/2018 8:13.23AM Page 2 COMPASS 5000.1 Build 81D
by
BP
BP Well Plan Survey Report
Company: North America - ALASKA - BP
EIW
Project: PBU
Easting
DLeg
Site: S
(usft)
(usft)
Well: S-202
(usft)
(°I100usft)
Wellbore: PLAN
S-2021-1 OBB
0.00
Design: S-2021-1 WP08 OBB
618,885.010
Survey Tool Program
Date 10/31/2018
0.00
From
To
618,885.010
(usft)
(usft) Survey (Wellbore)
Tool Name
40.00
2,000.00 5-20211 WP08 OBB (PLAN S-2021-1 OBB
GYD-GC-SS
2,000.00
3,130.00 5-2021-1 WP08 OBB (PLAN 5-2021-1 OBB
MWD
2,000.00
3,130.00 S-2021-1 WP08 OBB (PLAN S-20211 OBB
MWD+IFR+MS-WOCA
3,130.00
6,741.00 S-2021-1 WPOB OBB (PLAN S-2021-1 OBB
MWD
3,130.00
6,741.00 S-20211 WP08 OBB (PLAN S-20211 OBB
MWD+IFR+MS-WOCA
6,741.00
13,000.00 S-2021-1 WP08 OBB (PLAN 5-2021-1 OBB
MWD
6,741.00
13,000.00 S-20211 WP08 OBB (PLAN 5-2021-1 OBB
MWD+IFR+MS-WOCA
Planned Survey
0.00
0.00
MD
Inc Azi TVD
TVDSS
(usft)
(°) (°) (usft)
(usft)
40.00
0.00 0.00 40.00
-38.28
100.00
0.00 0.00 100.00
21.72
200.00
0.00 0.00 200.00
121.72
300.00
0.00 0.00 300.00
221.72
395.00
0.00 0.00 395.00
316.72
GC1
100.00
-0.55
400.00
0.00 0.00 400.00
321.72
500.00
0.00 0.00 500.00
421.72
600.00
0.00 0.00 600.00
521.72
610.00
0.00 0.00 610.00
531.72
Start Build 1.00
5,979,261.059
618,892.763
700.00
0.90 100.00 700.00
621.72
800.00
1.90 100.00 799.97
721.69
900.00
2.90 100.00 899.88
821.60
910.00
3.00 100.00 909.86
831.58
Start Build 2.00
0.00
1,000.00
4.80 100.00 999.65
921.37
1,100.00
6.80 100.00 1,099.13
1,020.85
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Description
Gyrodata gyro single shots
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
NIS
EIW
Northing
Easting
DLeg
TFace
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(°)
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
616,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
0.00
0.00
5,979,262.300
618,885.010
0.00
0.00
-0.12
0.70
5,979,262.188
618,885.708
1.00
100.00
-0.55
3.10
5,979,261.802
618,888.120
1.00
0.00
-1.27
7.23
5,979,261.141
618,892.255
1.00
0.00
-1.36
7.73
5,979,261.059
618,892.763
1.00
0.00
-2.43
13.76
5,979,260.092
618,898.807
2.00
0.00
-4.18
23.71
5,979,258.496
618,908.784
2.00
0.00
11/1/2018 8: 13 23A Page 3 COMPASS 5000.1 Build 8 1 D
BP
by
BP Well Plan Survey Report
Company: North America - ALASKA -
BP
Local Coordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-20211
OBB
Survey Calculation
Method:
Minimum Curvature
Design: S -202L1 WP08
OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
1,200.00
8.80
100.00
1,198.20
1,119.92
-6.54
37.08
5,979,256.352
618,922.183
2.00
0.00
1,210.00
9.00
100.00
1,208.08
1,129.80
-6.81
38.60
5,979,256.107
618,923.711
2.00
0.00
Start US 3.24 TFO 70.35
1,300.00
10.35
115.46
1,296.82
1,218.54
-11.50
52.83
5,979,251.636
618,938.016
3.24
70.35
1,400.00
12.48
127.83
1,394.85
1,316.57
-22.00
69.48
5,979,241.411
618,954.827
3.24
55.10
1,500.00
15.01
136.38
1,491.99
1,413.71
-38.01
86.96
5,979,225.682
618,972.552
3.24
42.97
1,600.00
17.77
142.42
1,587.92
1,509.64
-59.48
105.20
5,979,204.502
618,991.132
3.24
34.66
1,630.00
18.62
143.89
1,616.42
1,538.14
-66.98
110.82
5,979,197.094
618,996.865
3.24
28.87
SV6
1,700.00
20.66
146.86
1,682.34
1,604.06
-86.35
124.16
5,979,177.936
619,010.510
3.24
27.47
1,800.00
23.64
150.23
1,774.96
1,696.68
-118.53
143.76
5,979,146.071
619,030.624
3.24
24.68
1,900.00
26.68
152.88
1,865.46
1,787.18
-155.93
163.96
5,979,109.007
619,051.408
3.24
21.56
1,985.80
29.31
154.74
1,941.22
1,862.94
-192.07
181.71
5,979,073.151
619,069.726
3.24
19.16
BPRF
2,000.00
29.75
155.02
1,953.57
1,875.29
-198.41
184.68
5,979,066.864
619,072.797
3.24
17.51
2,100.00
32.86
156.79
2,039.01
1,960.73
-245.84
205.85
5,979,019.775
619,094.722
3.24
17.27
2,200.00
35.98
158.28
2,121.49
2,043.21
-298.08
227.42
5,978,967.891
619,117.114
3.24
15.76
EOCU
2,300.00
39.12
159.57
2,200.76
2,122.48
-354.95
249.31
5,978,911.377
619,139.901
3.24
14.52
SV5
2,400.00
42.28
160.69
2,276.56
2,198.28
-416.28
271.45
5,978,850.415
619,163.010
3.24
13.50
2,423.92
43.03
160.94
2,294.15
2,215.87
-431.58
276.78
5,978,835.197
619,168.576
3.24
12.65
Start DLS 3.24 TFO 163.80
2,500.00
40.67
162.00
2,350.82
2,272.54
-479.71
292.92
5,978,787.339
619,185.479
3.24
163.80
2,558.86
38.85
162.88
2,396.06
2,317.78
-515.60
304.28
5,978,751.639
619,197.410
3.24
163.02
SW
2,600.00
37.59
163.55
2,428.38
2,350.10
-539.97
311.64
5,978,727.392
619,205.148
3.24
162.33
2,700.00
34.52
165.33
2,509.22
2,430.94
-596.64
327.46
5,978,670.979
619,221.864
3.24
161.81
111112018 8:13.23AM
Page 4
COMPASS 5000.1 Build 81D
by
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
PLAN S-20211 OBB
Design:
S-2021-1 WP08 OBB
Planned Survey
MD
(usft)
2,800.00
2,900.00
3,000.00
3,031.55
SV3
3,100.00
3,130.00
10 3/4"
3,176.12
SV2
3,200.00
3,300.00
3,400.00
3,500.00
3,534.41
SV1
3,600.00
3,700.00
3,800.00
3,878.80
UG4
3,900.00
3,922.47
UG4A
4,000.00
4,100.00
4,200.00
BP
BP Well Plan Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
TFace
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
31.49
167.41
2,593.08
2,514.80
-649.56
340.33
5,978,618.278
619,235.575
3.24
160.37
28.50
169.88
2,679.68
2,601.40
-698.54
350.22
5,978,569.459
619,246.238
3.24
158.63
25.56
172.88
2,768.75
2,690.47
-743.45
357.09
5,978,524.676
619,253.816
3.24
156.48
24.65
173.96
2,797.32
2,719.04
-756.74
358.62
5,978,511.409
619,255.564
3.24
153.82
22.69
176.58
2,860.01
2,781.73
-784.12
360.91
5,978,484.074
619,258.288
3.24
152.84
21.85
177.87
2,887.77
2,809.49
-795.47
361.47
5,978,472.728
619,259.021
3.24
150.43
20.58
180.04
2,930.77
2,852.49
-812.16
361.78
5,978,456.048
619,259.600
3.24
149.24
19.94
181.27
2,953.17
2,874.89
-820.43
361.69
5,978,447.781
619,259.638
3.24
147.22
17.34
187.34
3,047.92
2,969.64
-852.27
359.41
5,978,415.913
619,257.862
3.24
146.07
14.99
195.35
3,143.97
3,065.69
-879.53
354.08
5,978,388.573
619,252.966
3.24
140.31
13.01
205.99
3,241.01
3,162.73
-902.13
345.71
5,978,365.847
619,244.965
3.24
132.61
12.45
210.36
3,274.58
3,196.30
-908.81
342.14
5,978,359.107
619,241.498
3.24
122.28
11.61
219.72
3,338.73
3,260.45
-919.99
334.35
5,978,347.808
619,233.885
3.24
118.02
10.99
236.00
3,436.82
3,358.54
-933.06
320.02
5,978,334.514
619,219.762
3.24
108.87
11.29
252.75
3,534.96
3,456.68
-941.29
302.76
5,978,326.007
619,202.639
3.24
92.90
12.14
264.62
3,612.13
3,533.85
-944.36
287.14
5,978,322.694
619,187.070
3.24
76.46
12.45
267.50
3,632.84
3,554.56
-944.67
282.64
5,978,322.314
619,182.573
3.24
64.84
12.81
270.40
3,654.77
3,576.49
-944.76
277.73
5,978,322.148
619,177.666
3.24
62.02
14.25
279.19
3,730.16
3,651.88
-943.17
259.71
5,978,323.447
619,159.627
3.24
59.19
16.49
288.04
3,826.58
3,748.30
-936.81
234.05
5,978,329.402
619,133.875
3.24
50.64
19.02
294.71
3,921.82
3,843.54
-925.60
205.75
5,978,340.161
619,105.398
3.24
42.11
111112018 8:13:23AM Page 5 COMPASS 5000.1 Build 81D
BP
0 by
BP Well
Plan Survey Report
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-2021-1 OBB
Survey Calculation
Method:
Minimum Curvature
Design: 5-202L1 WPO8 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD
Inc Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg TFace
(usft)
(°) (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft
4,236.95
20.00
296.76
3,956.65
3,878.37
-920.24
194.64
5,978,345.345
619,094.205
3.24
3575
UG3
4,300.00
21.72
299.83
4,015.57
3,937.29
-909.58
174.88
5,978,355.688
619,074.287
3.24
33.82
4,400.00
24 55
303.84
4,107.52
4,029.24
-888.80
141.56
5,978,375.936
619,040.642
3.24
30.95
4,500.00
27.47
307.05
4,197.39
4,119.11
-863.32
105.89
5,978,400.838
619,004.571
3.24
27 27
4,600.00
30.45
309.69
4,284.88
4,206.60
-833.24
67.97
5,978,430.315
618,966.187
3.24
24.38
4,700.00
33.47
311.89
4,369.72
4,291.44
-798.64
27.94
5,978,464.273
618,925.615
3.24
22.07
4,800.00
36.52
313.77
4,451.63
4,373.35
-759.63
-14.08
5,978,502.605
618,882.983
3.24
20.20
4,865.83
38 54
314.87
4,503.83
4,425.55
-731.61
-42.77
5,978,530.165
618,853.861
3.24
18.66
UG1
4,900.00
39.60
315.40
4,530.36
4,452.08
-716.34
-57.96
5,978,545.186
618,838.428
3.24
17.79
5,000.00
42.70
316.82
4,605.65
4,527.37
-668.91
-103.55
5,978,591.882
618,792.091
3.24
17.38
5,100.00
45.81
318.09
4,677.27
4,598.99
-617.49
-150.72
5,978,642.544
618,744.121
3.24
16.30
5,200.00
48 94
319.23
4,744.98
4,666.70
-562.25
-199.30
5,978,697.009
618,694.671
3.24
15.40
5,233.47
49.99
319.58
4,766.73
4,688.45
-542.93
-215.85
5,978,716.058
618,677.818
3.24
14.62
MA
5,300.00
52.08
320.26
4,808.57
4,730.29
-503.35
-249.15
5,978,755.104
618,643.899
3.24
14.39
5,316.31
52.59
320.42
4,818.53
4,740.25
-493.41
-257.39
5,978,764.909
618,635.506
3.24
13.97
MB
5,389.30
54.89
321.12
4,861.70
4,783.42
-447.82
-294.60
5,978,809.899
618,597.575
3.24
13.87
MC
5,400.00
55.22
321.21
4,867.83
4,789.55
-440.99
-300.10
5,978,816.644
618,591.967
3.24
13.46
5,500.00
58.38
322.10
4,922.58
4,844.30
-375.36
-352.00
5,978,881.431
618,539.040
3.24
1340
5,600.00
61.54
322.92
4,972.64
4,894.36
-306.68
-404.67
5,978,949.260
618,485.287
3.24
12.92
5,657.08
63.34
323.37
4,999.05
4,920.77
-266.20
-435.02
5,978,989.255
618,454.302
3.24
12.51
NA
5,699.04
64.67
323.69
5,017.44
4,939.16
-235.87
-457.44
5,979,019.218
618,431.408
3.24
12.30
NB
11/1/2018 8. 13.23AM
Page 6
COMPASS 5000.1 Build 81D
BP
bp
BP Well
Plan Survey Report
Company: North America - ALASKA
- BP
Local Co-ordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-2021-1
OBB
Survey Calculation Method:
Minimum Curvature
Design: S-2021-1 WP08 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD
Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg TFace
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft) V)
5,700.00
64.70
323.69
5,017.85
4,939.57
-235.17
-457.96
5,979,019.912
618,430.881
3.24
12.16
5,741.11
66.00
324.00
5,035.00
4,956.72
-205.00
-480.00
5,979,049.728
618,408.363
3.24
12.16
Start 100.00 hold at 5741.11 MD
5,767.79
66.00
324.00
5,045.85
4,967.57
-185.28
-494.32
5,979,069.212
618,393.729
0.00
0.00
NC
5,787.16
66.00
324.00
5,053.73
4,975.45
-170.97
-504.73
5,979,083.362
618,383.101
0.00
0.00
NE
5,800.00
66.00
324.00
5,058.95
4,980.67
-161.48
-511.62
5,979,092.738
618,376.059
0.00
0.00
5,841.11
66.00
324.00
5,075.67
4,997.39
-131.09
-533.70
5,979,122.768
618,353.505
0.00
0.00
Start Build 3.00
5,880.86
67.19
324.00
5,091.46
5,013.18
-101.59
-555.14
5,979,151.929
618,331.603
3.00
0.00
NF
5,900.00
67.77
324.00
5,098.79
5,020.51
-87.28
-565.53
5,979,166.066
618,320.984
3.00
0.00
5,969.98
69.87
324.00
5,124.08
5,045.80
-34.49
-603.88
5,979,218.237
618,281.801
3.00
0.00
OA
5,971.11
69.90
324.00
5,124.47
5,046.19
-33.63
-604.51
5,979,219.084
618,281.164
3.00
0.00
Start 100.00 hold at 5971.11 MD
6,000.00
69.90
324.00
5,134.40
5,056.12
-11.69
-620.45
5,979,240.773
618,264.875
0.00
0.00
6,039.88
69.90
324.00
5,148.10
5,069.82
18.61
-642.46
5,979,270.715
618,242.386
0.00
0.00
OA FS1
6,071.11
69.90
324.00
5,158.83
5,080.55
42.34
-659.70
5,979,294.167
618,224.772
0.00
0.00
Start Build 3.00
6,072.70
69.95
324.00
5,159.38
5,081.10
43.55
-660.58
5,979,295.361
618,223.875
3.00
0.00
OBA
6,100.00
70.77
324.00
5,168.56
5,090.28
64.35
-675.69
5,979,315.915
618,208.438
3.00
0.00
6,136.82
71.87
324.00
5,180.35
5,102.07
92.57
-696.20
5,979, 343.804
618,187.491
3.00
0.00
OBA_FS1
6,149.52
72.25
324.00
5,184.26
5,105.98
102.34
-703.30
5,979,353.461
618,180.238
3.00
0.00
OBB
11/1/2018 8: 13 23A
Page 7
COMPASS 5000.1 Build 81D
111112018 8:13:23AM Page 8 COMPASS 5000.1 Build 81D
BP
by
BP Well
Plan Survey Report
Company: North America
- ALASKA - BP
Local Coordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft (Original
Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft (Original
Well Elev)
Well: 5-202
North Reference:
True
Wellbore: PLAN S-20211 OBB
Survey Calculation Method:
Minimum Curvature
Design: S-2021-1 WP08 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD
Inc Azi
TVD
TVDSS
N/S
E/W
Northing
Easting DLeg
TFace
(usft)
(°) (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(°)
6,200.00
73.77
324.00
5,199.01
5,120.73
141.40
-731.67
5,979,392.059
618,151.248
3.00
0.00
6,204.85
73.91
324.00
5,200.36
5,122.08
145.16
-734.41
5,979,395.781
618,148.453
3.00
0.00
OBB_FS3
6,282.43
76.24
324.00
5,220.34
5,142.06
205.81
-778.47
5,979,455.715
618,103.438
3.00
0.00
OBC
6,300.00
76.77
324.00
5,224.44
5,146.16
219.63
-788.51
5,979,469.374
618,093.179
3.00
0.00
6,357.01
78.48
324.00
5,236.66
5,158.38
264.67
-821.24
5,979,513.890
618,059.745
3.00
0.00
OBC_FS1
6,400.00
79.77
324.00
5,244.77
5,166.49
298.83
-846.06
5,979,547.646
618,034.391
3.00
0.00
6,436.53
80.86
324.00
5,250.92
5,172.64
327.97
-867.22
5,979,576.438
618,012.766
3.00
0.00
OBD
6,500.00
82.77
324.00
5,259.96
5,181.68
378.79
-904.15
5,979,626.662
617,975.044
3.00
0.00
6,600.00
85.77
324.00
5,269.94
5,191.66
459.27
-962.62
5,979,706.206
617,915.302
3.00
0.00
6,700.00
88.77
324.00
5,274.71
5,196.43
540.07
-1,021.33
5,979,786.058
617,855.327
3.00
0.00
6,741.00
90.00
324.00
5,275.16
5,196.88
573.24
-1,045.43
5,979,818.836
617,830.709
3.00
0.00
7 5/8"
6,741.11
90.00
324.00
5,275.16
5,196.88
573.33
-1,045.49
5,979,818.927
617,830.640
3.00
0.00
Start Build 8.00
6,800.00
94.71
324.00
5,272.74
5,194.46
620.92
-1,080.07
5,979,865.954
617,795.319
8.00
0.00
6,866.11
100.00
324.00
5,264.28
5,186.00
673.95
-1,118.59
5,979,918.360
617,755.959
8.00
0.00
Start 742.00 hold at 6866.11 MD
6,900.00
100.00
324.00
5,258.39
5,180.11
700.95
-1,138.21
5,979,945.041
617,735.919
0.00
0.00
7,000.00
100.00
324.00
5,241.03
5,162.75
780.62
-1,196.09
5,980,023.779
617,676.782
0.00
0.00
7,100.00
100.00
324.00
5,223.66
5,145.38
860.29
-1,253.98
5,980,102.516
617,617.644
0.00
0.00
7,200.00
100.00
324.00
5,206.30
5,128.02
939.96
-1,311.87
5,980,181.254
617,558.507
0.00
0.00
7,300.00
100.00
324.00
5,188.93
5,110.65
1,019.64
-1,369.75
5,980,259.991
617,499.370
0.00
0.00
7,400.00
100.00
324.00
5,171.57
5,093.29
1,099.31
-1,427.64
5,980,338.729
617,440.232
0.00
0.00
7,500.00
100.00
324.00
5,154.20
5,075.92
1,178.98
-1,485.52
5,980,417.466
617,381.095
0.00
0.00
111112018 8:13:23AM Page 8 COMPASS 5000.1 Build 81D
BP
by
BP Well Plan Survey Report
Company: North America
- ALASKA - BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S -202L1
OBB
Survey Calculation
Method:
Minimum Curvature
Design: S -202L1 WP08 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
N/S
EIW
Northing
Easting
DLeg
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
7,600.00
100.00
324.00
5,136.84
5,058.56
1,258.65
-1,543.41
5,980,496.204
617,321.957
0.00
0.00
7,608.11
100.00
324.00
5,135.43
5,057.15
1,265.12
-1,548.10
5,980,502.593
617,317.159
0.00
0.00
Start DLS 6.00 TFO 180.00
7,700.00
94.49
324.00
5,123.85
5,045.57
1,338.84
-1,601.66
5,980,575.443
617,262.443
6.00
-180.00
7,758.11
91.00
324.00
5,121.07
5,042.79
1,385.79
-1,635.78
5,980,621.846
617,227.591
6.00
180.00
Start 402.00 hold at 7758.11
MD
7,800.00
91.00
324.00
5,120.33
5,042.05
1,419.67
-1,660.39
5,980,655.330
617,202.443
0.00
0.00
7,900.00
91.00
324.00
5,118.59
5,040.31
1,500.56
-1,719.16
5,980,735.270
617,142.402
0.00
0.00
8,000.00
91.00
324.00
5,116.84
5,038.56
1,581.45
-1,777.93
5,980,815.210
617,082.361
0.00
0.00
8,100.00
91.00
324.00
5,115.10
5,036.82
1,662.34
-1,836.70
5,980,895.150
617,022.321
0.00
0.00
8,160.11
91.00
324.00
5,114.05
5,035.77
1,710.96
-1,872.03
5,980,943.205
616,986.228
0.00
0.00
Start Drop -1.50
8,200.00
90.40
324.00
5,113.56
5,035.28
1,743.23
-1,895.47
5,980,975.092
616,962.278
1.50
180.00
8,240.11
89.80
324.00
5,113.49
5,035.21
1,775.68
-1,919.05
5,981,007.164
616,938.190
1.50
180.00
Start 340.00 hold at 8240.11
MD
8,300.00
89.80
324.00
5,113.70
5,035.42
1,824.13
-1,954.25
5,981,055.044
616,902.229
0.00
0.00
8,400.00
89.80
324.00
5,114.05
5,035.77
1,905.03
-2,013.03
5,981,134.996
616,842.180
0.00
0.00
8,500.00
89.80
324.00
5,114.40
5,036.12
1,985.93
-2,071.81
5,981,214.947
616,782.130
0.00
0.00
8,580.11
89.80
324.00
5,114.68
5,036.40
2,050.75
-2,118.90
5,981,279.000
616,734.022
0.00
0.00
Start DLS 2.00 TFO 82.00
8,600.00
89.86
324.39
5,114.74
5,036.46
2,066.88
-2,130.53
5,981,294.940
616,722.136
2.00
82.00
8,700.00
90.13
326.37
5,114.75
5,036.47
2,149.17
-2,187.33
5,981,376.315
616,664.038
2.00
82.00
8,800.00
90.41
328.35
5,114.27
5,035.99
2,233.38
-2,241.26
5,981,459.649
616,608.787
2.00
82.00
8,900.00
90.69
330.34
5,113.31
5,035.03
2,319.39
-2,292.24
5,981,544.839
616,556.452
2.00
82.01
8,980.11
90.91
331.92
5,112.19
5,033.91
2,389.54
-2,330.92
5,981,614.358
616,516.670
2.00
82.03
Start DLS 2.00 TFO 93.00
9,000.00
90.89
332.32
5,111.88
5,033.60
2,407.12
-2,340.22
5,981,631.783
616,507.096
2.00
93.00
9100.00
90.79
334.32
5,110.41
5,032.13
2,496.45
-2,385.11
5,981,720.389
616,460.792
2.00
93.01
11/1/2018 8.13 23AM
Page 9
COMPASS 5000.1 Build 81D
BP
by
BP Well Plan Survey Report
Company: North America
- ALASKA - BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S -202L1
OBB
Survey Calculation
Method:
Minimum Curvature
Design: 5-202L1 WP08
OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft) (°)
9,200.00
90.68
336.31
5,109.14
5,030.86
2,587.30
-2,426.87
5,981,810.558
616,417.604
2.00
93.04
9,300.00
90.57
338.31
5,108.04
5,029.76
2,679.56
-2,465.43
5,981,902.180
616,377.583
2.00
93.06
9,400.00
90.46
340.31
5,107.14
5,028.86
2,773.10
-2,500.76
5,981,995.142
616,340.779
2.00
93.08
9,500.00
90.36
342.31
5,106.42
5,028.14
2,867.82
-2,532.81
5,982,089.332
616,307.237
2.00
93.10
9,600.00
90.25
344.30
5,105.90
5,027.62
2,963.60
-2,561.53
5,982,184.634
616,276.997
2.00
93.12
9,700.00
90.14
346.30
5,105.56
5,027.28
3,060.32
-2,586.90
5,982,280.933
616,250.096
2.00
93.13
9,800.00
90.03
348.30
5,105.42
5,027.14
3,157.87
-2,608.89
5,982,378.112
616,226.568
2.00
93.13
9,900.00
89.92
350.29
5,105.46
5,027.18
3,256.12
-2,627.46
5,982,476.052
616,206.440
2.00
93.14
10,000.00
89.81
352.29
5,105.70
5,027.42
3,354.96
-2,642.60
5,982,574.633
616,189.737
2.00
93.13
10,100.00
89.70
354.29
5,106.13
5,027.85
3,454.27
-2,654.28
5,982,673.736
616,176.480
2.00
93.13
10,180.11
89.61
355.89
5,106.61
5,028.33
3,534.09
-2,661.14
5,982,753.426
616,168.356
2.00
93.12
Start 990.00 hold at 10180.11 MD
10,200.00
89.61
355.89
5,106.74
5,028.46
3,553.92
-2,662.57
5,982,773.234
616,166.616
0.00
0.00
10,300.00
89.61
355.89
5,107.42
5,029.14
3,653.66
-2,669.74
5,982,872.839
616,157.865
0.00
0.00
10,400.00
89.61
355.89
5,108.09
5,029.81
3,753.40
-2,676.91
5,982,972.445
616,149.114
0.00
0.00
10,500.00
89.61
355.89
5,108.77
5,030.49
3,853.14
-2,684.08
5,983,072.051
616,140.363
0.00
0.00
10,600.00
89.61
355.89
5,109.44
5,031.16
3,952.88
-2,691.25
5,983,171.656
616,131.612
0.00
0.00
10,700.00
89.61
355.89
5,110.12
5,031.84
4,052.62
-2,698.42
5,983,271.262
616,122.861
0.00
0.00
10,800.00
89.61
355.89
5,110.79
5,032.51
4,152.36
-2,705.59
5,983,370.868
616,114.111
0.00
0.00
10,900.00
89.61
355.89
5,111.47
5,033.19
4,252.10
-2,712.76
5,983,470.473
616,105.360
0.00
0.00
11,000.00
89.61
355.89
5,112.14
5,033.86
4,351.84
-2,719.93
5,983,570.079
616,096.609
0.00
0.00
11,100.00
89.61
355.89
5,112.82
5,034.54
4,451.59
-2,727.10
5,983,669.685
616,087.858
0.00
0.00
11,170.11
89.61
355.89
5,113.29
5,035.01
4,521.52
-2,732.13
5,983,739.522
616,081.722
0.00
0.00
Start DLS 2.00 TFC, 97.00
11,200.00
89.54
356.48
5,113.51
5,035.23
4,551.34
-2,734.11
5,983,769.303
616,079.261
2.00
97.00
11,300.00
89.30
358.47
5,114.52
5,036.24
4,651.23
-2,738.52
5,983,869.105
616,073.271
2.00
97.00
11,400.00
89.05
0.45
5,115.96
5,037.68
4,751.21
-2,739.46
5,983,969.049
616,070.741
2.00
96.98
11/1/2018 8:13:23AM
Page 10
COMPASS 5000.1 Build 81D
Company: North America - ALASKA - BP
Project: PBU
TVDSS
Site: S
E/W
Well: S-202
Easting
Wellbore: PLAN S-2021-1
OBB
Design: S-2021-1 WP08 OBB
Planned Survey
(usft)
MD Inc
Azi
(usft) V)
V)
11,500.00
88.81
11,600.00
88.57
11,700.00
88.34
11, 750.11
88.22
Start DLS 2.00 TFC, 90.00
2.00
11,800.00
88.22
11,900.00
88.22
12,000.00
88.22
12,100.00
88.23
12,200.00
88.24
12,300.00
88.25
12,370.11
88.26
Start 629.89 hold at 12370.11 MD
12,400.00
88.26
12,500.00
88.26
12,600.00
88.26
12,700.00
88.26
12,800.00
88.26
12,900.00
88.26
13,000.00
88.26
TD at 13000.00
5,047.58
BP
BP Well Plan Survey Report
Local Co-ordinate Reference: Well S-202
TVD Reference: PLAN KB @ 78.28usft (Original Well Elev)
MD Reference: PLAN KB @ 78.28usft (Original Well Elev)
North Reference: True
Survey Calculation Method: Minimum Curvature
Database: EDM R5K - Alaska PROD - ANCP1
11/1/2018 8.13:23AM Page 11 COMPASS 5000.1 Build 81D
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
TFace
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
V)
2.44
5,117.82
5,039.54
4,851.15
-2,736.94
5,984,069.014
616,071.677
2.00
96.95
4.42
5,120.10
5,041.82
4,950.94
-2,730.96
5,984,168.878
616,076.075
2.00
96.91
6.41
5,122.80
5,044.52
5,050.46
-2,721.52
5,984,268.519
616,083.931
2.00
96.86
7.41
5,124.31
5,046.03
5,100.18
-2,715.50
5,984,318.331
616,089.166
2.00
96.81
8.40
5,125.86
5,047.58
5,149.57
-2,708.64
5,984,367.816
616,095.239
2.00
90.00
10.41
5,128.97
5,050.69
5,248.17
-2,692.31
5,984,466.658
616,110.003
2.00
89.97
12.41
5,132.07
5,053.79
5,346.15
-2,672.54
5,984,564.924
616,128.210
2.00
89.91
14.41
5,135.17
5,056.89
5,443.37
-2,649.37
5,984,662.494
616,149.837
2.00
89.84
16.41
5,138.25
5,059.97
5,539.73
-2,622.81
5,984,759.251
616,174.858
2.00
89.78
18.41
5,141.31
5,063.03
5,635.09
-2,592.91
5,984,855.075
616,203.241
2.00
89.72
19.81
5,143.45
5,065.17
5,701.31
-2,569.97
5,984,921.642
616,225.129
2.00
89.66
19.81
5,144.36
5,066.08
5,729.42
-2,559.84
5,984,949.901
616,234.806
0.00
0.00
19.81
5,147.39
5,069.11
5,823.45
-2,525.96
5,985,044.457
616,267.185
0.00
0.00
19.81
5,150.43
5,072.15
5,917.49
-2,492.09
5,985,139.012
616,299.564
0.00
0.00
19.81
5,153.47
5,075.19
6,011.53
-2,458.21
5,985,233.567
616,331.943
0.00
0.00
19.81
5,156.51
5,078.23
6,105.57
-2,424.33
5,985,328.122
616,364.322
0.00
0.00
19.81
5,159.55
5,081.27
6,199.60
-2,390.45
5,985,422.678
616,396.701
0.00
0.00
19.81
5,162.59
5,084.31
6,293.64
-2,356.57
5,985,517.233
616,429.080
0.00
0.00
11/1/2018 8.13:23AM Page 11 COMPASS 5000.1 Build 81D
BP
by BP Well Plan Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
ND Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well:
S-202
North Reference:
True
Wellbore:
PLAN S -202L1
OBB
Survey Calculation Method:
Minimum Curvature
Design:
S -202L1 WP08 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Casing Points
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
(usft)
Name
(in) (in)
3,130.00
2,887.77
10 3/4"
10.750 13.250
6,741.00
5,275.16
7 5/8"
7.625 9.825
13,000.00
5,162.59
41/2"
4.500 6.125
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
610.00
610.00
0.00
0.00
Start Build 1.00
910.00
909.86
-1.36
7.73
Start Build 2.00
1,210.00
1,208.08
-6.81
38.60
Start DLS 3.24 TFO 70.35
2,423.92
2,294.15
-431.58
276.78
Start DLS 3.24 TFO 163.80
5,741.11
5,035.00
-205.00
-480.00
Start 100.00 hold at 5741.11 MD
5,841.11
5,075.67
-131.09
-533.70
Start Build 3.00
5,971.11
5,124.47
-33.63
-604.51
Start 100.00 hold at 597 1. 11 MD
6,071.11
5,158.83
42.34
-659.70
Start Build 3.00
6,741.11
5,275.16
573.33
-1,045.49
Start Build 8.00
6,866.11
5,264.28
673.95
-1,118.59
Start 742.00 hold at 6866.11 MD
7,608.11
5,135.43
1,265.12
-1,548.10
Start DLS 6.00 TFO 180.00
7,758.11
5,121.07
1,385.79
-1,635.78
Start 402.00 hold at 7758.11 MD
8,160.11
5,114.05
1,710.96
-1,872.03
Start Drop -1.50
8,240.11
5,113.49
1,775.68
-1,919.05
Start 340.00 hold at 8240.11 MD
8,580.11
5,114.68
2,050.75
-2,118.90
Start DLS 2.00 TFO 82.00
8,980.11
5,112.19
2,389.54
-2,330.92
Start DLS 2.00 TFO 93.00
10,180.11
5,106.61
3,534.09
-2,661.14
Start 990.00 hold at 10180.11 MD
11,170.11
5,113.29
4,521.52
-2,732.13
Start DLS 2.00 TFO 97.00
11,750.11
5,124.31
5,100.18
-2,715.50
Start DLS 2.00 TFO 90.00
12,370.11
5,143.45
5,701.31
-2,569.97
Start 629.89 hold at 12370.11 MD
13,000.00
5,162.59
6,293.64
-2,356.57
TD at 13000.00
11/1/2018 8.13:23AM Page 12 COMPASS 5000.1 Build 81D
Obp
North America - ALASKA - BP
PBU
S
S-202
PLAN S -202L1 OBB
S -202L1 WP08 OBB
Anticollision Summary Report
01 November, 2018
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
PLAN S-2021-1 OBB
Reference Design:
S-2021-1 WP08 OBB
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
S-2021-1 WP08 OBB
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,496.00usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 10/31/2018
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
40.00
2,000.00 S-2021-1 WP08 OBB (PLAN S-2021-1 OBB
GYD-GC-SS
2,000.00
3,130.00 S-2021-1 WP08 OBB (PLAN S-2021-1 OBB
MWD
2,000.00
3,130.00 S -202L1 WP08 OBB (PLAN S-2021-1 OBB
MWD+IFR+MS-WOCA
3,130.00
6,741.00 S-2021-1 WP08 OBB (PLAN S-20211 OBB
MWD
3,130.00
6,741.00 S-20211 WP08 OBB (PLAN S -202L1 OBB
MWD+IFR+MS-WOCA
6,741.00
13,000.00 S-2021-1 WP08 OBB (PLAN S-2021-1 OBB
MWD
6,741.00
13,000.00 S-2021-1 WP08 OBB (PLAN S -202L1 OBB
MWD+IFR+MS-WOCA
Description
Gyrodata gyro single shots
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
11/1/2018 9:20:56AM Page 2 of 5 COMPASS 5000.1 Build 81D
BP
fr by Anticollision Repoli
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
ND Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S-2021-1 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S -202L1 WP08 OBB
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
S
Plan Kup 13-100 Spurs s -slot 05 v3.0 - Plan Kup 13
501.19
500.00
64.56
8.62
55.94
Pass - Major Risk
Plan Kup S-xxx Coventry s -slot 01 v3.0 - Plan Kup
649.44
650.00
58.97
10.85
48.19
Pass - Major Risk
S-01 -S-01 -S-01
7,178.94
5,675.00
285.08
232.51
56.18
Pass - Major Risk
S-01 - S -01A- S -01A
7,178.94
5,675.00
285.08
232.51
56.18
Pass - Major Risk
S-01 - S-01 B - S-01 B
7,177.38
5,675.00
284.18
232.13
56.11
Pass - Major Risk
S-01 - S-01 C - S-01 C
7,177.38
5,675.00
284.18
232.13
56.11
Pass - Major Risk
S-02 - IGNORE ME - Plan 3
4,989.25
5,075.00
481.58
75.07
410.25
Pass - Major Risk
S-02 - S-02 - S-02
4,989.13
5,075.00
481.60
75.06
410.27
Pass - Major Risk
S-02 - S -02A- S -02A
4,989.31
5,075.00
481.57
75.08
410.24
Pass - Major Risk
S-02 - S-02ALl - S-02ALl
4,989.31
5,075.00
481.57
75.08
410.24
Pass - Major Risk
S-02 - S-02AL1 PB1 - S-02ALl PB1
4,989.31
5,075.00
481.57
75.08
410.24
Pass - Major Risk
S-02 - S-02AP61 - S-02AP131
4,989.31
5,075.00
481.57
75.08
410.24
Pass - Major Risk
S-03 - S-03 - S-03
8,924.72
6,525.00
417.29
222.75
217.19
Pass - Major Risk
S-09 - S-09 - S-09
5,268.65
5,450.00
595.56
118.33
477.57
Pass - Major Risk
S-100 - S-100 - S-100
10,465.90
6,700.00
1,219.73
305.06
955.05
Pass - Major Risk
S-102 - S-102 - S-102
12,125.00
7,750.00
819.80
353.41
560.72
Pass - Major Risk
S-102 - S -1 02L1 - S-1021-1
12,125.00
7,750.00
819.80
352.69
561.19
Pass - Major Risk
S-102 - S-1 02L1 PB1 - S-1 02L1 PB1
12,125.00
7,750.00
819.80
352.69
561.18
Pass - Major Risk
S-102 - S-102PB1 - S-102PB1
12,125.00
7,750.00
819.80
353.96
560.17
Pass - Major Risk
S-103 - S-103 - S-103
11,854.40
7,375.00
536.08
346.04
237.84
Pass - Major Risk
S-107 - S-107 - S-107
11,425.00
7,075.00
1,326.37
305.28
1,093.69
Pass - Major Risk
S-111 - S-111 - S-111
288.86
275.00
1,471.37
5.79
1,465.58
Pass - Major Risk
S-111 - S-111 P131 - S-111 PB1
288.86
275.00
1,471.37
5.79
1,465.58
Pass - Major Risk
S-111 - S-111 PB2 - S-111 PB2
288.86
275.00
1,471.37
5.79
1,465.58
Pass - Major Risk
S-115 - S-115 - S-115
8,257.27
5,675.00
290.63
152.02
139.33
Pass - Major Risk
S-118 - S-118 - S-118
6,318.57
5,500.00
189.10
119.41
75.38
Pass - Major Risk
S-120 - S-120 - S-120
9,125.00
6,025.00
1,082.45
202.16
893.45
Pass - Major Risk
S-122 - S-122 - S-122
12,991.30
8,050.00
1,028.96
319.56
745.83
Pass - Major Risk
S-122 - S-122PB1 - S-122PB1
12,991.30
8,050.00
1,028.96
319.70
745.69
Pass - Major Risk
S-122 - S-122PB2 - S-122PB2
12,991.30
8,050.00
1,028.96
319.57
745.83
Pass - Major Risk
S-122 - S-122PB3 - S-122PB3
12,991.30
8,050.00
1,028.96
319.56
745.83
Pass - Major Risk
S-126 - S-126 - S-126
535.77
525.00
113.69
9.53
104.16
Pass - Major Risk
S-128 - S-128 - S-128
586.26
575.00
166.37
10.13
156.25
Pass - Major Risk
S-128 - S-128PB1 - S-128PB1
479.44
468.00
161.73
8.94
152.80
Pass - Major Risk
S-128 - S-128PB2 - S-128PB2
586.27
575.00
166.00
10.05
155.97
Pass - Major Risk
S-1 3 - S-1 3A - S -13A
1,853.48
1,850.00
1,407.35
29.68
1,377.70
Pass - Major Risk
S-134 - S-134 - S-134
1,302.98
1,300.00
99.91
20.62
79.36
Pass - Major Risk
S-135 - S-135 - S-135
243.69
250.00
33.35
4.16
29.26
Pass - Major Risk
S-135 - S-135PB1 - S-135PB1
243.69
250.00
33.35
4.32
29.11
Pass - Major Risk
S-135 - S-135PB2 - S-135PB2
243.69
250.00
33.35
4.16
29.26
Pass - Major Risk
S-15 - S-15 - S-15
1,054.68
1,050.00
233.65
18.36
215.30
Pass - Major Risk
S-15 - S-15PI31 - S-15PB1
1,054.68
1,050.00
233.65
18.36
215.30
Pass - Major Risk
S-16 - S-16 - S-16
909.92
900.00
127.26
14.07
113.19
Pass - Major Risk
S-16 - S-1 6P131 - S -1 6P61
909.92
900.00
127.26
14.07
113.19
Pass - Major Risk
S-17 - S-17 - S-17
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S -17A - S -17A
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S-17AL1 - S-17AL1
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S-17AL1 P61 - S-17AL1 PB1
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S-17APB1 - S-17API31
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S -17B - S -17B
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S-1 7C - S-1 7C
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1 /10
S-17 - S-17CPB1 - S-17CPB1
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
S-17 - S-17CPB2 - S-17CP132
610.79
600.00
14.78
3.65
11.12
Pass - Minor 1/10
11/1/2018 9:20:56AM Page 3 of 5 COMPASS 5000.1 Build 81D
BP
by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
ND Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S -202L1 OBB
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-2021-1 WP08 OBB
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
S
S-18 - S-18 - S-18
628.02
625.00
95.26
12.20
83.06
Pass - Major Risk
S-18 - S -18A - S -18A
631.03
625.00
95.33
12.27
83.06
Pass - Major Risk
S-18 - S -18B - S -18B
631.03
625.00
95.33
12.27
83.06
Pass - Major Risk
S-19 - S-19 - S-19
5,354.42
5,200.00
678.25
151.30
530.63
Pass - Major Risk
S-200 - S-200 - S-200
8,933.45
6,000.00
800.99
243.46
560.90
Pass - Major Risk
S-200 - S -200A - S -200A
11,098.04
7,675.00
529.15
297.72
317.35
Pass - Major Risk
S-200 - S-200PB1 - S-200PB1
8,400.71
5,775.00
902.66
213.42
690.77
Pass - Major Risk
S-201 - S-201 - S-201
11,316.61
6,900.00
1,265.20
323.32
960.37
Pass - Major Risk
S-213 - S -213A - S -213A
6,731.15
5,400.00
834.34
97.62
749.93
Pass - Major Risk
S-213 - S-213ALl - S-213ALl
6,731.15
5,400.00
834.34
97.62
749.93
Pass - Major Risk
S-213 - S-213ALl-01 - S-213ALl-01
6,731.15
5,400.00
834.34
97.62
749.93
Pass - Major Risk
S-213 - S-213AL2 - S-213AL2
6,731.15
5,400.00
834.34
97.62
749.93
Pass - Major Risk
S-213 - S-213AL3 - S-213AL3
6,731.15
5,400.00
834.34
97.62
749.93
Pass - Major Risk
S-214 - PLAN S-214 NB - S-214 NB WP03 Prelim
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-214 - PLAN S-214 OA - S-214 OA WP03 Prelim
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-214 - PLAN S-214 OBA - S-214 OBA WP03 Pre
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-214 - PLAN S-214 OBB - S-214 OBB WP03 Pre
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-214 - PLAN S-214 OBC - S-214 OBC WP03 Pre
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-214 - PLAN S-214 OBD - S-214 OBD WP03 Pre
899.96
900.00
32.45
15.54
16.91
Pass - Major Risk
S-215 - S-215 - S-215
1,408.11
1,425.00
212.58
21.41
191.24
Pass - Major Risk
S-217 - S-217 - S-217
928.35
925.00
52.71
19.36
33.35
Pass - Major Risk
S-218 - S-218 - S-218
1,055.63
1,050.00
32.53
17.24
15.44
Pass - Major Risk
S-22 - S-22 - S-22
7,075.08
5,575.00
651.82
113.73
540.39
Pass - Major Risk
S-22 - S -22A - S -22A
7,075.08
5,575.00
651.82
113.73
540.39
Pass - Major Risk
S-22 - S -22B - S -22B
7,056.62
5,525.00
659.89
112.02
549.08
Pass - Major Risk
S-27 - S-27 - S-27
5,169.83
5,250.00
468.90
88.76
385.89
Pass - Major Risk
S-27 - S -27A - S -27A
5,169.83
5,250.00
468.90
88.76
385.89
Pass - Major Risk
S-27 - S-27APB1 - S-27APB1
5,169.83
5,250.00
468.90
88.76
385.89
Pass - Major Risk
S-27 - S -27B - S -27B
5,169.70
5,250.00
468.93
88.76
385.89
Pass - Major Risk
S-28 - S-28 - S-28
5,681.84
5,375.00
165.23
109.28
64.35
Pass - Major Risk
S-28 - S -28A - S -28A
5,681.84
5,375.00
165.23
109.28
64.35
Pass - Major Risk
S-28 - S -28B - S -28B
5,682.22
5,375.00
165.07
109.31
64.32
Pass - Major Risk
S-28 - S-28BPB1 - S-28BPB1
5,682.22
5,375.00
165.07
109.31
64.32
Pass - Major Risk
S-29 - S-29 - S-29
3,963.91
4,350.00
298.99
89.69
209.33
Pass - Major Risk
S-29 - S -29A - S -29A
3,961.13
4,350.00
299.04
89.57
209.53
Pass - Major Risk
S-29 - S-29ALl - S-29ALl
3,961.13
4,350.00
299.04
89.84
209.26
Pass - Major Risk
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown
40.08
40.08
17.22
1.11
16.12
Pass - Major Risk
S-40 - S-40 - S-40
385.18
375.00
17.18
2.14
15.05
Pass - Minor 1/10
S-40 - S -40A - S -40A
385.18
375.00
17.18
2.14
15.05
Pass - Minor 1 /10
S-401 - S-401 - S-401
10,663.94
6,566.00
1,193.41
266.61
1,045.99
Pass - Major Risk
S-44 - S -44A - S -44A
8,410.01
6,150.00
479.17
212.26
307.77
Pass - Major Risk
11/1/2018 9:20:56AM Page 4 of 5 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
PLAN S-20211 OBB
Reference Design:
S-2021-1 WP08 OBB
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to PLAN KB @ 78.28usft ( Original Well Coordinates are relative to: S-202
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK
Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 0.91 °
E
S 1200-
C)
0
v
0
ro
a
800 -
c
a)
U
O =
� 400
U
0
Ladder Plot
I
I I
I
I
I
I
I
I
I
I
I
I
1!
I
I
I
I
I
I
i I
I
I c
E-
N
-
27AP 1, 1
'
S -115,S-115,
-115
-
,S-2713,5- B y
I
I
$ S-15, S-15, S
5 V2
9, S -29A, 529A V0
- -
-
-
S-15, S -1 5P6
1, S-1 5F B'
S-
9,S-29AL1,S-29AL1 N 10 _.
I
- $ S -128,S-128
B2,S1 8
S-
9, S-29, S-29 V 1
I
$ S-128, S-' 28,
-128 0
I
61,51 8
$63-01A,501AV35000 7500 10000 12500 '� Seo, -4oA
$ S-01,S-01C,S-01CV0 Measured Depth (2500 usft/in) S -40,S -40,S -40V1
$ S-01, S-01, S-01 V9 $ S-40,DONTL)SEPla
0
-�- S-134, 5134, 5134 V0 $ 5135, 5135P131, 51
-� S-218, 5218, S-218 V0 $ 5135, 5135PB2, 51 35
$ S-217, 5217, 5217 V8 $ S-16, S-16PB1, S-1 6F B'
$ S-126, S-126, S-126 V12 S-16, S-16, 516 V2
$ S-401, S-401, S-401 V4 -rte Plan Kup S -)=Cove
�f S-111, S-111, S-111 V15 $ S-13, S -13A, S -13A V
-a�- S-111, S-111 PB2, S-111 PB2 V4 $ S-02, S-02AL1, S-0 1
$ S-111,S-111P131,S-111PI31 V5 $ S-02, S-02AP131, S-0,
$ 5122, 5122PB3, 5122PB3 V2 $ S-02, IGNORE ME, P ar
$ 5122.S-122PB1.5122PB1 V4 S-02 S-02A,S-02A
111112018 9:20:56AM Page 5 of 5 COMPASS 5000.1 Build 81D
Ary T—Nath MILL DETAILS WELLBOREDETAILS REFERENCEINFOWATION
Project: PBU MaF.WN..:17.1
,�.rey�_, Site: S Ground Level: 38.26 PLANS-202 OBB C"dine� ryp Cp
Lam^ Well: S-202 Mae mFeld NoMin : 5979262.300 Rekrance We&S202B, True North ) GiH GR
RJIJ smgm:57a5n.mn 9 Vertical D Reference: PLAN KB 78.28ueR 0' mel Well El., F�UGHES
Wellbore: PIANS-202OBB DipAroe:e085 Easting: 618885.010 Seddon (VS) Reference: Slot-(0.00N. O.00E)
Plan: S-202L1WPD8OBB Wte:&27/201 Lattitude: 70°21'7.194N Tie on MD: 40.00 Measured Depth Reference: PLAN KB@ 78.28uelt(OriginelWellElev) aGf
MWO133331A31e Longitude: 149° 7 4.870 W CelouMtion Method: MininurrCurvaere
a
a�
AN KI
SECTION DETAILS ANNOTATIONS
West( -)/East(+)
Vertical Section at 340.00° (400 usft/in)
1E
to
:3 1E
0
"14
0
T 1;
M
CL
du 12
U)
�11
c
vic
0
� c
c
U E
Project: PBU ANTI -COLLISION SETTINGS
Site: S Interpolation Method: MD. interval: 20.00
Well: 5-202 Depth Range From: 40.00 To 13000.00
Resuhs Limited By: Centre Distance: 1488.00
Wellbore: PLAN S-2021_1 OBB Reference: Plan: S -202L1 WPO8 OBB (8-202/PLAN S -202L1 OBB)
Plan: S -202L1 WPO8OBB
5 � L
G S-118
1 fM1
S -40A i
I
�I
z S
-S-217 S -28B
S-135
A m -+ -+ N N N W N A A A 0 N m d
O O N m O A Co N 0) O A Co N O O t
O O O O O O O O O O O O O O O C
O O O O O O O O O O O O O C
I S-115
OB
S-01 C
Measured Depth (400 usft/in)
COMPANY DETAILS: North America -ALASKA- BP
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Tray. Cylinder North
Error Surface: EIIipBcalConic
Warning Method: Rules Based
JaUIEGRIHSE
GE company
SURVEY PROGRAM North America - ALASKA- BP
Depth From Depth To Survey/Plan Tool
40.00 2000.00 S-2021.1 WP08 OBB (PLAN S-2021_1 OBB) GYD-GC-SS
2000.00 3130.00 S-202LI WP08 OBB (PLAN S-202LI OBB) MWD
2000.00 3130.00 S -202L1 WP08 OBB (PLAN S -202L1 OBB) MWD+IFR+MS�WOCA
3130.00 6741.00 S-2021.1 WPO8 OBB(PLAN S -202L7 OBB) MWD
3130.00 6741.00 S-202LI WPOS OBB (PLAN S•2021. OBB) MWD+IFR+MS-WOCA
6741.00 13000.00 S -202L1 WPO8 OBB (PLAN S -202L1 OBB) MWD
6741.00 13000.00 S-2021_1 WP08 OBS (PLAN S-2021.7 OBB) MWD+IFR+MS-WOCA
From Colour To MD
40
1400
1400
2000
2000
3130
3130
5600
5600
5800
5800 -----6200
6200
6400
6400
_-7000
7000
—7300
7300
----13000
I
us us_
N 0)
O O
O
O
O
A
O
m
N
8
N
O
N
A
N
m
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
bySite:
Project: PBU
S
WELL DETAILS:
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America -ALASKA - BP
Ground Level: 38.28
Interpolation Method: MD,interval:25.00
Calculation Method: MinimumCurvature
+N/ -S +FJ -W
Well: S-202
Norhting: 5979282.300
Depth Range From: 40.00 To 3130.00
Error System; ISCWSA
0.00 0.00 40.00
Wellbore: PLAN 5.2021.1 OBB
Plan: PLANS -202 1 WPOS OBB
Eesif .818885.010
Latin 70° 21' 7.194 N
Longitude: 149° 2'4.870 W
Results Limited By: Centre Distance: 1498.00
Reference: S -202L1 WP08 OBB
Scan Method: Trev. Cylinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
Surface Hole Traveling Cylinder
S -202L' WP08 OB
40.00 To 3130.00
S-17C
I
1
S-40
S-4pA
®oo
1_
S-217
SURVEYPROGRAM
Depth From Depth To SuwyrPlan Tool
40.00 2000.00 S-2021.1 WP08 OBB (PLAN S -202L1 OBB) GYD-GCS$
2000.00 3130.00 5-2021.1 WP08 OBB(PLAN S-2021_1 OBB) MWD
2000.00 3130.00 S-2021_1 WP08 OBB (PLAN S-202LI OBB) MWD+IFR+MS-VYOCA
3130.00 6741.00 S -202L1 WP08 OBB IPLAN S -202L1 OBB) MWD
3130.00 6741.00 S-202LI WPO8 OBB (PLAN S-2021.1 OBB) MWD+IFR+MSWOCA
6741.00 13000.00 S-202L,WP08 OBB (PLAN S-2021_1 OBB) MWD
6741.00 13000.00 5-2021.7 WP08 OBB (PLAN S -202L1 OBB) MWU+IFR+M&V40CA
9 4 From Colour To MD
40 1400
30 1400 2000
2000---- --- 3130
BA ER
FUGHES
a Gf mmlkmy
IN
SECTION DETAILS
Sec
MD
Inc Azi TVD
+N/ -S +FJ -W
Dleg
TFace VSect
1
40.00
0.00 0.00 40.00
0.00 0.00
0.00
0.00 0.00
2
616.96
0.60 9.90 6,6.66
6.66 0.00
6.09
9.90 6.06
3
910.00
3.00 100.00 909.86
-1.36 7.73
1.00
100.00 -3.93
4
1210.00
9.00 100.00 1208.08
-6.81 38.60
2.00
0.00 -19.60
5
2423.92
43:03 160.94 2294.15
431.58 276.78
3.24
70.35 500.22
6
5741.11
66.00 324.00 5035.00
-205.00 480.00
3.24
163.80 -28.47
7
5841.11
66.00 324.00 5075.67
-131.09 -533.70
0.00
0.00 59.35
8
5971.11
69.90 324.00 5124.47
-33.63 504.51
3.00
0.00 175.15
9
6071.11
69.90 324.00 5158.83
42.34 559.70
0.00
0.00 265.42
10
6741.11
90.00 324.00 5275.16
573.33 -1045.49
3.00
0.00 896.34
11
6866.11
100.00 324.00 5264.28
673.95 -1118.59
8.00
0.00 1015.89
12
7608.11
100.00 324.00 5135.43
1265.12 -1548.10
0.00
0.00 1718.31
13
7758.11
91.00 324.00 5121.07
1385.79 -1635.78
6.00
180.00 1861.68
14
8160.11
91.00 324.00 5114.05
1710.96 -1872.03
0.00
0.00 2248.05
15
8240.11
89.80 324.00 5113.49
1775.68 -1919.05
1.50
180.00 2324.95
16
8580.11
89.80 324.00 5114.68
2050.75 -2118.90
0.00
0.00 2651.78
17
8980.11
90.91 331.92 5112.19
2389.54 -2330.92
2.00
82.00 3042.65
18
10180.11
89.61 355.89 5106.61
3534.09 -2661.14
2,00
93.00 4231.12
19
11170.11
89.61 355.89 5113.29
4521.52 -2732.13
0.00
0.00 5183.28
20
11750.11
88.22 7.41 5124.31
5100.18 -2715.50
2.00
97.00 5721.36
21
12370.11
88.26 19.81 5143.45
5701.31 -2569.97
2.00
90,00 6236.46
22
13000.00
68.26 19.81 5162.59
6293,64 -2356.57
0.00
0.00 6720.08
IN
WELL DETAILS: ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA -BP
bProject: PBU BAKER
p Site. S Ground Level 5979 Interpolation Method: MD,3130.00 To 1300. Calculation Method: Minimum Curvature JUGHE$
Well S-202 Norhting: 5979282.300 Depth Range From: 3130.00 To 13000.00 Error System: ISCWSA
Wellbore. PLAN S-2021.1 OBB Easting: 618685.010 Results Limited By: Centre Distance: 1496.00 Scan Method: Tray. Cylinder North a i F rortpany
Plan: S -202L1 WP08088 Lattitude: 70° 21'7.194 N Reference: S-202LI WP08 OBB Error Surface: Elliptical Conic
Longitude: 149° 2'4.870 W Warning Method: Rules Based
� 120
70 21 50 lS-28BP61
_--- 80 180
Azimuth from North [°I vs Centre to Centre Separation [30 usfVln]
90
100
210 110 150
- - 120---
180
Azimuth from North[*] vs Centre to Centre Separation [10 usft(n] ,u,,.�, ., °, -•� a"°'°""' ¢"""'
SURVEYPROGRAM
Intermediate/Production Traveling Cylinder
Sec
Depth From
Depth To SurveylPlan Tool
Azi TVD -N/-S +E/ -W
40.00
2000.00 S-2021.1 VVP08 OBB (PLAN S2021.1 OBB) GYD-GCSS
S-2021.1 WP08 OBB
2000.00
3130.00 5-202L1WP08OBB (PLANS202L1OBB) MWD
0.00 40.00 0.00 0.00
2000.00
3130.00 S-202LJ WP08 OBB PLAN S-2021.1 OBB) MWD+IFR+MSWOCA
2
3130.00
6741.00 S-2021-1WP08 OBB (PLANS -202L1 OBB) MWD
3130.00 To 13000.00
3130.00
6741.00 S-2021_1 WP08 OBB (PLAN S -202L7 OBB) MWD+IFR+MSVuOCA
3
8741.00
13000.00S-2021_1 WP08 OBB(PLAN S202L7 OBB) MWD
100.00 909.86 -1.36 7.73
6741.00
13000.00 S-2021_1 WP08 OBB (PLAN S -202L1088) MWD+IFR+MSWOCA
4
1210.00
2000 3130
100.00 1208.08 -6.81 38.60
120
0.00 -19.60
5
2423.92
3130 5600
330
110
5600 5800
- --
5741.11
5800 - 6200
324.00 5035.00 -205.00 480.00
100
6200 6400
7
5841.11
6400 7000
324.00 5075.67 -131.09 -533.70
90
0.00 59.35
-
7000-----7300
32400 5124.47 -33.63 504.51
wn
13000
� 120
70 21 50 lS-28BP61
_--- 80 180
Azimuth from North [°I vs Centre to Centre Separation [30 usfVln]
90
100
210 110 150
- - 120---
180
Azimuth from North[*] vs Centre to Centre Separation [10 usft(n] ,u,,.�, ., °, -•� a"°'°""' ¢"""'
SECTION DETAILS
Sec
MDInc
Azi TVD -N/-S +E/ -W
Dleg
TFace VSect
1
40.00
0.00
0.00 40.00 0.00 0.00
0.00
0.00 0.00
2
610.00
0.000.00
610.00 0.00 0.00
0.00
0.00 0.00
3
910.00
3.00
100.00 909.86 -1.36 7.73
1.00
100.00 -3.93
4
1210.00
9.00
100.00 1208.08 -6.81 38.60
2.00
0.00 -19.60
5
2423.92
43.03
160.94 2294.15 431,58 276.78
3.24
70.35 -500.22
6
5741.11
66.00
324.00 5035.00 -205.00 480.00
3.24
163.80 -28.47
7
5841.11
66.00
324.00 5075.67 -131.09 -533.70
0.00
0.00 59.35
1597111
69.90
32400 5124.47 -33.63 504.51
3.00
0.00 175.15
9
6071.11
69.90
324.00 5158.83 42.34 -659.70
0.00
0.00 265.42
10
6741.11
90.00
324.00 5275.16 573.33 -1045.49
3.00
0.00 896.34
11
6866.11
100.00
324.00 5264.28 673.95 -1118.59
8.00
0.00 1015.89
12
7608.11
100.00
324.00 5135.43 1265.12 -1548.10
0.00
0.00 1718.31
13
7758.11
91.00
324.00 5121.07 1385.79 -1635.78
6.00
180.00 1861.68
14
8160.11
91.00
324.00 5114.05 1710.96 -1872.03
0.00
0.00 2248.05
15
8240.11
89.80
324.00 5113.49 1775.68 -1919.05
1.50
180.00 2324:95
16
8580.11
89.80
324.00 5114.68 2050.75 -2118.90
0.00
0.00 2651.78
17
8980.11
90.91
331.92 5112.19 2389.54 -2330.92
2.00
8200. 3042.65
16
10180.11
89.61
355.89 5106.61 3534.09 -2661.14
200
9300 4231,12
19
11170.1189.61
355.89 5113.29 4521.52 -2732.13
0.00
0.00 5183.28
20
11 750. 11
88.22
7.41 5124.31 5100.18 -2715.50
2.00
97.00 5721.36
21
12370.11
88.26
19.81 5143.45 5701,31 -2569.97
2.00
90.00 6236.46
22
13000.00 88.26
19.81 5162.59 6293.64 -2356.57
0.00
0.00 6720.08
� 120
70 21 50 lS-28BP61
_--- 80 180
Azimuth from North [°I vs Centre to Centre Separation [30 usfVln]
90
100
210 110 150
- - 120---
180
Azimuth from North[*] vs Centre to Centre Separation [10 usft(n] ,u,,.�, ., °, -•� a"°'°""' ¢"""'
Project: PBU
SRO: S
A:;rem°t°rraeN°m
Mag ntleN°M 16
Megreocneu
WELLBORE DETAILS: PLAN S -202L1
REFEREWEINFOWATION
C"dinate(NIE)Relemw Wells -202, Trua Wth
Well: S-202
.4 S7tlB.1en
Tie on MD: 40.00
Vertcal(M)Referense: PLAN KB@ 78.28us8(Origirml Well Elev)
OWe112019
SerAon (VS)Refarenm: Slot- (O.00N,000E)
We m112019
B
000
Measured Oeplh Relemnm PLAN KB@ 7828usft(OngirmlWell Elev)
MOM acetum
Cebuleaon MedmdMininumCurveare
AOGCC Spider Plot - Offsets within 200ft
Easting (400 usft)in)
S-202:/ S-2021-1 / S-20211-2 / S-2021-3 / S-2021-4 WP08 Flus 500ft MID
S-202 WPO8 OBD Plus- 500ft MD
-S2021-1 W008 OBB Plus 500fMID
--S2 042 WKS OBC Plus 500ft MD
_ S-202LOBA Plus 500ft MD
S -13A S -202L4 WPO8 OA Plus 500ft MD
0
0
0
0
S-16,/9260 w o
5983600
5983600
B
000
8000
0
598320
- -
5983200
I
�
5982800
�
- - - -
5982800 o
C
Z598240
7000
I
- - - - -
5982400
598200,
5982000
SJD
O
598160
6000
- � -
5981600
598120
- - - :...
�... I
5981200
598080
- : - �
5980800
5980400
S 17B
5000
- - - - -
5980400
gOOO
5980000
- o,
5-118 p
- -
5980000
P9'4217
5979600
S -17C
000 40
5979600
F
597920
S'-17CP82 -
- -
5979200
S -126h
o S
v3.0 (Kodiak Brown)
O
597880
o.
o
000
1
5978800
p
S -40A '.
5978400
S-128 - -
6��0 5-735 S-134 o o
�O:
O
500
,5-4,0 - - -
5978400
S -128P82,
S-135R8S288
S -135P62 W��
S - 217
S-218
S-188
mS,E2
ma Tm rnR
0 8 S o 0 0 0 o
a o 0 0
0 0 0 0 o
0 0
8
8 0 8 o
o
Easting (400 usfUin)
0
o o a o 0 0 0
North America - ALASKA - BP
PBU
S
S-202
PLAN S-2021-1 OBB
S-2021-1 WP08 OBB Plus 500ft MD
AOGCC Offset Well Report
21 August, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
PLAN S -202L1 OBB
Reference Design:
S-2021-1 WP08 OBB Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
teference S-2021-1 WP08 OBB Plus 500ft MD
�ilter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria
nterpolationMethod: MD Interval25.00usft Error Model: ISCWSA
)epth Range: Unlimited Scan Method: Tray. Cylinder North
tesults Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic
Survey Tool Program
Date 8/21/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
40.00
2,000.00 S-2021-1 WP08 OBB Plus 500ft MD (PLAN
GYD-GC-SS
2,000.00
3,130.00 S-2021-1 WP08 OBB Plus 500ft MD (PLAN
MWD
2,000.00
3,130.00 S-20211 WP08 OBB Plus 500ft MD (PLAN
MWD+IFR+MS-WOCA
3,130.00
6,741.00 S-2021-1 WP08 OBB Plus 500ft MD (PLAN
MWD
3,130.00
6,741.00 S-2021-1 WP08 OBB Plus 500ft MD (PLAN
MWD+IFR+MS-WOCA
6,741.00
13,500.00 S-20211 WP08 OBB Plus 500ft MD (PLAN
MWD
6,741.00
13,500.00 S-20211 WP08 OBB Plus 500ft MD (PLAN
MWD+IFR+MS-WOCA
Description
Gyrodata gyro single shots
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
8/21/2019 1:43:26PM Page 2 of 125 COMPASS 5000.1 Build 81D
BP
0 by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
O.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S-2021-1 OBB
Database:
EDM R5K-Alaska PROD -ANCP1
Reference Design:
S-2021-1 WP08 OBB Plus 500ft MD
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
S
S-118 - S-118 - S-118
6,318.57
5,500.00
189.10
5-126 - S-126 - 5-126
535.77
525.00
113.69
S-128 - S-128 - S-128
586.26
575.00
166.37
S-128 - 5-128PB1 - S-128PB1
479.44
468.00
161.73
S-128 - S-128PB2 - S-128PB2
586.27
575.00
166.00
S-134 - 5-134 - S-134
1,302.98
1,300.00
99.91
S-135 - S-135 - S-135
243.69
250.00
33.35
S-135 - S-135PB1 - 5-135PB1
243.69
250.00
33.35
S-135 - S-135PB2 - S-135PB2
243.69
250.00
33.35
S-16 - S-16 - 5-16
909.92
900.00
127.26
5-16 - S-16PB1 - S-16PB1
909.92
900.00
127.26
S-17 - S-17 - 5-17
760.66
750.00
15.26
S-17 - S -17A - S -17A
760.66
750.00
15.26
S-17 - S-17AL1 - S-17AL1
760.66
750.00
15.26
S-17 - S-17AL1 PB1 - S-17AL1 PB1
760.66
750.00
15.26
S-17 - S-17APB1 - S-17APB1
760.66
750.00
15.26
S-17 - S -17B - 5-176
760.66
750.00
15.26
S-17 - S -17C - S -17C
760.66
750.00
15.26
5-17 - S-17CPB1 - S-17CPB1
760.66
750.00
15.26
S-17 - S-17CPB2 - S-17CPB2
760.66
750.00
15.26
S-18 - S-18 - 5-18
628.02
625.00
95.26
S-18 - S -18A - S -18A
631.03
625.00
95.33
S-18 - S -18B - S -18B
631.03
625.00
95.33
S-202 - PLAN S-202 OBD - S-202 WPO8 OBD
7,000.00
7,000.00
0.28
S-202 - PLAN 5-2021-1 OBB - S-2021-1 WP08 OBB
11,175.00
11,175.00
0.00
S-202 - PLAN 5-2021-2 OBC - S-2021-2 WP08 OBC
13,074.21
13,000.00
95.05
S-202 - PLAN S-2021-3 OBA- S-2021-3 WPOS OBA
13,093.42
13,000.00
63.73
S-202 - PLAN S-2021-4 OA- S-2021-4 WP08 OA
13,161.72
13,000.00
139.88
5-214 - PLAN S-214 - NB - 5-214 WP09 NB
974.28
975.00
30.89
S-214 - PLAN S-2141-1 - OBD - 5-2141-1 WP09 - OBD
974.28
975.00
30.89
5-214 - PLAN S-2141-1-01 - OBB - S-2141-1-01 WP09 OBB
974.28
975.00
30.89
S-214 - PLAN 5-214L1-02 - OBC - S -214L1-02 WP09 - OBC
974.28
975.00
30.89
5-214 - PLAN S-2141-2 - OBA- S-2141-2 WP09 - OBA
974.28
975.00
30.89
S-214 - PLAN 5-2141-3 - OA - S-2141-3 WP09 - OA
974.28
975.00
30.89
5-217 - S-217 - S-217
928.35
925.00
52.71
S-218 - 5-218 - 5-218
1,055.63
1,050.00
32.53
S-28 - S-28 - S-28
5,681.84
5,375.00
165.23
S-28 - S -28A - S -28A
5,681.84
5,375.00
165.23
S-28 - S -28B - S -28B
5,682.22
5,375.00
165.07
S-28 - S-28BPB1 - S-28BPB1
5,682.22
5,375.00
165.07
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown) - Plan S -40B v3.0
40.08
40.08
17.22
(Kodiak Brown)
S-40 - S-40 - S-40
860.21
850.00
18.84
5-40 - S -40A - S -40A
860.21
850.00
18.84
8/21/2019 1,43:26PM Page 3 of 3 COMPASS 5000.1 Build 81D
TRANSMITTAL LETTER CHECKLIST
WELL NAME: Pa a 5- p 0 P, L I
PTD: p�
Development _ Service _ Exploratory Stratigraphic Test Non -Conventional
FIELD: POOL: 15'G A Kailer Via ® /
Check Box for Appropriate etter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. a 19 —1AQ , API No. 50- 0-79- 2364-x-- p0- 00
V/
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-_-
50--
___) from records, data and logs acquired for well
___)
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after com letion, sus ension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, SCHRADER BLUF OIL - 64013 - -
PTD#:2191210 Company BP Exploration (Alaska) Inc. Initial Class/Type
--_Well Name: PRUDHOE_BAY UNIT -S -202 -Li- _ - -__ Program DEV Well bore seg d❑
DEV / PEND—GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑
Administration
1
Permit fee attached
NA
2
Lease number appropriate_
Yes
3
Unique well name and number
No.
4
Well located in a_define_d_pool_ . - - -
Yes
5
Well located proper distance from drilling unit boundary_
Yes
6
Well located proper distance from other wells_
Yes
7
Sufficient acreage available in drilling unit_
Yes
8
If deviated, is wellbore plat -included
Yes
Directional_ plan_ view & wellbore profile included.
9
Operator only affected party
Yes
10
Operator has appropriate- bond in force - - - - -
Yes
11
Permit can be issued without conservation order_ - -
Yes
Appr Date
12
Permit can be issued without administrative_appr_oval - - -
Yes
- - --
13
Can permit be approved before 15-day_wa_it_
Yes
DLB 9/10/2019
�14
Well located within area and strata authorized by_Injection Order# (put. 10# in comments) (For
NA_
15
All wells _within _1/4_mile_area_of review identified (For service well only) -
NA_
16
Pre -produced injector: duration -of pre -production Less than 3 months_ (For -service well only) - -
NA_
---------------------------------
17
N_onconve_n. gas conforms to AS31,05.0300.1_.A),(j.2.A-D) - - - - - - -
NA_
- - - - - - - - - - - - - - - -
-
18
----------
Conductor string -provided - - - - - - - - - - - - -
Yes
34_"x20" Conductor set-to 11.5' MD
Engineering
19
Surface casing protects all -known_ USDWs -
Yes
BPF 1862'_MD, SC -shoe to 2887 ssTVD, fully cemented
i20
CMT_vol adequate to circulate -on conductor_& su_rf_csg - -
Yes
- - - - - Fully cemented surface casing_ - - - - - _ . - . - -
21
CMT_vol_ adequate -to tie -in -long string to surf csg_Yes
- - - - - - - - - - - - - - - - - - - - - - - -
22
CMT will coverall known -productive horizons _
Yes
TOC on 7-5/8" casing from shoe to 1500'_MD above top of SB
23
Casing designs adequate for C,_T, B &_permafrost-
Yes
24
Adequate tankage. or reserve pit ---
Yes
Park 272_ has ongoing operations and_good truck and fluids support
25
If a- re -drill, has a 107403 for abandonment been approved _ _ _ _ _ _
NA_ _
_ _ _ _ _ _ This is a new grassroots well _ _ _ _ _ _ _ _
26
Adequate wellbore separation -proposed
Yes
S-201_ will be shut in,_5-17 and S-40 -will be secured with deep set plugs- -
27
If_diverter required, does it meet regulations_
Yes _
_ _ _ _ _
Appr Date
28
Drilling fluid_ program schematic-&. equip -list adequate - - -
Yes
All fluids overbalance t_o_pore_pressure
MGR 9/16/2019
29
BOPEs,_do they meet_ regulation - - - - - -
Yes
1 annular, 3ram-stack - - - - -
30
BOPE press rating appropriate; test to -(put psig in comments)-
Yes
Wstack tested to -3500 psi
31
Choke manifold complies w/API_RP-53 (May 84)_ _ _ _ _ _
Yes _
- - _ - _ _ - _ _ _ _
32
Work will occur without operation shutdown_ - - -
Yes
Parker 272 is ongoing operations
33
Is presence. of H2S gas_ probable - - -
Yes
SPad isanH2P
_ _ _S_ pad,_ standard BP alarms and monitors in place
34
Mechanical_ condition of wells within AOR verified (For. service well only) - - -
NA
�'36
35
Permit -can be issued w/o hydrogen_ sulfide measures - - - - . - - - - - -
No
S -Pad wells are-H2S-bearing-in the Schrader Bluff.. H2S_ measures are required.
Geology
Data presented on potential overpressure zones - - - - - -
Yes
Appr Date
37
Seismic -analysis of shallow gas -zones_
NA
38Seabed
condition survey -(if off -shore) - - - - - - - - - - - - - - - - - - - -
NA_
39
Contact name/phone for weekly -progress reports_ [exploratory only] --------