Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-124DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill 2191240 Well Name/No. PRUDHOE BAY UN POL S -202L4 Operator BP Exploration (Alaska) Inc. API No. 50-029-23647-63-00
MD 11506 TVD 5053 Completion Date 11/19/2019 Completion Status 1-0IL Current Status 1-0I1- UIC No
REQUIRED INFORMATION
Mud Log Nov/ Samples No V Directional Survey Yes
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES, MWD/GR/RES/DEN/NEU, MWD/GR/RES/DEN/NEU
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data
Digital
Dataset Log Log Run Interval OH /
Type
Med/Frmt
Number Name Scale Media No Start Stop CH
Received
Comments
ED
C
32010 Digital Data 98 11506
2/3/2020
Electronic Data Set, Filename: S -
202L4 BH_LTK_MEM_Composite_Drilling
Depth Data.las
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK-
IMAGE_5MD_Memory Drilling Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK_2MD_Memory
Drilling Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK_2MD_Memory
Drilling Log.cgm.meta
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-
202L4_BH_LTK_2TVDSS_Memory Drilling
Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK_5MD_Memory
Drilling Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-
202L4_BH_LTK_5TVDSS_Memory Drilling
Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK-VSS_RLT-
MEM_Composite Drilling Dynamics Log.cgm
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-
2021-4131-1 LTK_MEM_Composite_Drilling
Depth Data.dls
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK-
IMAGE_5MD_Memory Drilling Log.pdf
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK_2MD_Memory
Drilling Log.pdf
AOGCC
Page I of 3
Tuesday, February 25, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill
2191240 Well Name/No. PRUDHOE BAY UN POL S-2021-4 Operator BP Exploration (Alaska) Inc. API No. 50-029-23647-63-00
MD
11506
TVD 5053 Completion Date 11/19/2019
Completion Status 1-0I1- Current Status 1 -OIL UIC No
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-
2021-4_ BH_ LTK_2TVDSS_Memory Drilling
Log.pdf
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_LTK_5MD_Memory
Drilling Log.pdf
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-
2021-4 BH_LTK_5TVDSS_Memory Drilling
Log.pdf
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-2021-4_13H_Final Surveys
Report.csv
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-202L4_BH_Final Surveys
Report.pdf
ED
C
32010 Digital Data
2/3/2020
Electronic File: S-2021-4_13H_Final Surveys
Report.txt
Log
32010 Log Header Scans
0 0
2191240 PRUDHOE BAY UN POL S-2021-4
LOG HEADERS
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report 0
Production Test Information Y
Geologic Markers/Tops V
COMPLIANCE HISTORY
Completion Date: 11/19/2019
Release Date: 9/17/2019
Description
Directional / Inclination Data ( Y)
Mechanical Integrity Test Information Y / NA
Daily Operations Summary D
Date Comments
Mud Logs, Image Files, Digital Data Y /& Core Chips Y / 6
Composite Logs, Image, Data Files C9 Core Photographs Yo
Cuttings Samples Y /(N) Laboratory Analyses Yo
AOGCC Page 2 of 3 Tuesday, February 25, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2020
Permit to Drill 2191240 Well Name/No. PRUDHOE BAY UN POL S-2021-4 Operator BP Exploration (Alaska) Inc.
MD 11506 TVD 5053 Completion Date 11/19/2019 Completion Status 1-0I1- Current Status 1-011-
Comments:
-OIL
Comments:
Compliance Reviewed By.�w /'Q'',
API No. 50-029-23647-63-00
UIC No
Date: 2? /d I �a- c, z0
AOGCC Page 3 of 3 Tuesday, February 25, 2020
Beaker Hughes `- PRINT DISTRIBUTION LIST
COMPANY BP Exploration Alaska Inc.
WELL NAME s-202 ; Li • L2.' L 3,,,L P/
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT
Alaska
AUTHORIZED BY Paul Canizares
EMAIL Paul.Canizaresp_bakerhuohes.com
STATUS Final Replacement
COMPANY
ADDRESS (FEDEX WDLL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
------------------------- ----------------------- -----
0 North Slope.
EOA PBOC, PRB-20 (Office 109)
'D&C Wells Project Aides
:Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
:Anchorage, Alaska 99508
--.....- -------------------- ------------ ..-.---- .------ .------.-...-----
2 !ConocoPhillips Alaska Inc.
I:Attn: Ricky Elgarico
ATO 3-344
700 G Street
;Anchora... _--- _.. ... - ._ ------
2 19 124
32010
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, 1-132-1
900 E. Benson Blvd. Anchorage, Alaska 99508 or
GANCPDC@bp365.onmicrosoft.com
Ito acknowledge receipt of this data.
LOG TYPE GR-RES-DEN-NEU
LTK: Density Image Log
LOG DATE October 30, 2019
TODAYS DATE January 30, 2020
Revision
No Details:
Rev. Requested by: ---
FIELD /
FINAL
CD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
Locs
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
11t OF COPIES
JJ 4 4 4 JJ 4
0 0 0 0 0
0 0 1 N: 0 0
fro
3 , ExxanMobif Upstream Oil &Gas, US Conventional Q
:c/o ExxonMobil Upstream Integrated Solutions Company
:Attn: Technical Data Center (TDC)
;22777 Springwoods Village Parkway
N2.2A.332
:Spring, Texas 77389
JV-2019-USONSHOR-288
- - ------ - -- --.----- ---..... ............ .... - -
4 State of Alaska - AOGCC 0 0 1 0 0
Attn: Natural Resources Technitian
:333 W. 7th Ave, Suite 100
:Anchorage, Alaska 99501
- - -- -
--------- - - -- -- -
5'DNR - Division of Oil & Gas **' 0 0 1 0 0
:Attn: Rersource Evaluation Section
550 West 7th Avenue, Suite 1100
'.Anchorage, Alaska 99501
*** Stam "confidential" on all material deliver to DNR
Stamp
---------------- -----------......------.....--------------------------------- -------------
6 BP Exploration (Alaska) Inc. 0 0 0 1 0 1 0
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Nancy Landi
TOTALS FOR THIS PAGE: 0 0 4 0 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL )MPLETION OR RECOMPLETION REPO AND LOG
1a. Well Status: Oil Q • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ 11WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
Development p Exploratory El
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Aband.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
11/19/2019
219-124
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
11/10/2019
50-029-23647-63-00 '
4a. Location of Well (Governmental Section):
8. Date TO Reached:
16. Well Name and Number:
11/15/2019
PBU S-2021_4 "
Surface: 3060' FSL, 4567' FEL, Sec. 35, T12N, R12E, UM
9 Ref Elevations KB 84 80
17. Field/Pool(s):
Top of Productive Interval: 3021' FSL, 5158' FEL, Sec. 35, T12N, R12E, UM
GL 37.90 BF 39.65
PRUDHOE BAY, PRUDHOE OIL "
Total Depth: 2669' FSL, 2101' FEL, Sec. 27, T12N, R12E, UM
10. Plug Back Depth(MD/TVD):
18. Property Designation:
An28957
" 11506'/5053'
Ani R 098958
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 618885 ' y- 5979263 Zone - ASP 4
11506'/ 5053'
83-47
TPI: x- 618295 y- 5979214 Zone - ASP 4
12. SSSV Depth (MD/TVD):
PO Thickness of Permafrost MD/TVD:
Total Depth: x- 615988 y- 5984107 Zone - ASP 4
None
1953'/ 1910'
5. Directional or Inclination Survey: Yes Q (attached) No ❑
13. Water Depth, if Offshore:
21. Re-drill/Lateral Top Window
Mnrrvn
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
5849'15092'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, MWD /GR/RES /DEN /NEU,MWD /GR/RES / DEN /NEU
23,
CASING, LINER AND CEMENTING RECORD
CASING
Wf. PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP BOTTOM
20"
129.45#
x-65
47'
162'
47' 162'
42"xDriven
13 yds Concrete
10-3/4"
45.5#
L-80
46'
3128'
46' 2902'
13-1/2"
1587 sx LiteCrete, 272 sx Class'G'
7-5/8"
29.7# 1
L-80
45'
5849'
45' 5092'
9-7/8"
692 sx Class'G'
4-1/2"
12.6#
L-80
5743'
11461'
5049' 5048'
6-3/4"
Uncemented Slotted Liner
24. Open to production or injection? Yes 0 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom, Perforation
Size and Number; Date Perfd):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.6# L-80 5752' 5637'/5002'
4-1/2" Slotted Liner, Open Hole 11/16/2019
5849'- 11461' 5092' - 5048'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11461'- 11506' 5048' - 5053'
Was hydraulic fracturing used during completion? Yes ElNo Q
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
RECE®
® L- L
'.'OMPLETIO j
/IDTFDEC 1 8 2019
AOGCC
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production: December 3, 2019
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date of Test:
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Size:
Gas -Oil Ratio:
Test Period -♦
Flow Tubing
Press
Casinq Press:
Calculated
24 Hour Rate
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravitv - API (corr):
Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
��Qo rv�o ABDMS±� DEC 2 3 2019
28. CORE DATA Conventional Core(s) Yes ❑ No 0 - Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervo., cored (MD+TVD of top and bottom of each), and summarize ...00logy and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
5934'
5120'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Schrader Bluff OA
5934'
5120'
Formation at total depth:
Schrader Bluff OA
5934'
5120'
31. List of Attachments: Summary of Daily Drilling Reports, Survey, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Gorham, Bradley M
Authorized Title: SI ecialist Contact Email: Bradley. Gorham@bp.com
Authorized Signature: Ilk KL ON Date: 1?/j Contact Phone: 907-564-4649
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 512017 Submit ORIGINAL Only
TRFF =
WELLHEAD =
ACTUATOR=
KB. ELEV =
BF. ELEV =
KOP =
Max Armle = 98° 6848'
Datum MD = _ 5831'
Datum TVD = '5000'
5-22 SAFET' `OTES: WELL ANGLE > 70' @ 5980'. MAX
DLS: 8. M 6848'. "`CHROME TBG"
(L1, L2, L37 & L4)
20' COND —
10-3/4' CSG, 45.5#, L-00 VAM 21 BTC, 3128'
D = 9.950'
Minimum ID: 3.813" a@ 2008'
4-1/2" HES X NIPPLE
4-12' TBG, 12.6#, 13CR-85 VAM TOP,
.0152 bpf, ID = 3.958'
BAKER HOOK HANGER ASSY 5843'
w/1-2 SEALING LEM. ID =3688"
14-12' RA TAG I
LEM #2 LOWER SEAL ASSY, ID = 3 870- 5935'
BAKER HOOK HANGER ASSY 6001'
w/ L1 SEALING LEM, ID = 3.688'
12' RA TAG 1--1 6066-
LEM #1 LOWER SEAL ASSY, ID = 3.688' 6108'
7-5/8" CSG, 29.7#, L-80 VT HC, ID = 6.875- 6759' I i
I I
i I
i I
I I
LZ 5-1
'7290 ,1.4
G-- /o,, Ute. !,7 a h -P 's-202'
A" (OBd)
4-12- SLTD LNR, 12.6#, L-80,
0152 bpf, ID = 3.958"
2008' - 14-12- HES X NP, D = 3.813'
5539' 4 12' HES SLIDING SLEEVE, ID = 3.813-
5567' -1 DOWNHOLE GAUGE
5637'7-5/8' X4-12' HES TNT PKR, ID = 3.856'
5669'4-12- HES X NIP, ID = 3.813-
5736' I--14-12- HES X NIP, ID = 3.813-
5743' 75/8' X 512' BKR ZX P LTP w/ HGR &TIEBK, ID = 6.530'
5752' 4-12' WLEG, ID = 3.958'
5763' 19' SEAL BORE EXTENSION, ID =4 75-
REV BY
4-12" SLTD LNR, 12.6#, L-00 DWC, .0152 bpf, ID = 3.958 11461'
GAS LIFT MANDRELS
- - - - - - - - - - - -
LS (OA) LEM WINDOW 67°
iT
MD
I TVD
DEV
TYPE
VLV
LATCH
PORT
I DATE
3
3491
3245
14
KBG-2
DOME
BK
16
12/02/19
2
4480
4192
27
KBG-2
DOME
BK
16
12/02/19
117102t19
1
5463
4914
57
KBG-2
SO
BK
24
5539' 4 12' HES SLIDING SLEEVE, ID = 3.813-
5567' -1 DOWNHOLE GAUGE
5637'7-5/8' X4-12' HES TNT PKR, ID = 3.856'
5669'4-12- HES X NIP, ID = 3.813-
5736' I--14-12- HES X NIP, ID = 3.813-
5743' 75/8' X 512' BKR ZX P LTP w/ HGR &TIEBK, ID = 6.530'
5752' 4-12' WLEG, ID = 3.958'
5763' 19' SEAL BORE EXTENSION, ID =4 75-
6093' 1-119' SEAL BORE EXTENSION, ID = 4.75"
I4-12" SLID LNR 12.6#�L-80 DWC, .0152 bpf, ID = 3.958 12777'
L_1 (OB_b_)
7480' 6' FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
4-12- SLTD LNR, 12.6#, L-80 DWC, .0152 bpf, ID = 3.9581413184-
----------------------
L2
13184-
- - - - - - - - - - - - - - - - - - - - - -,
` L2 OBc '
6876' 6- FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LNER)
DATE
REV BY
4-12" SLTD LNR, 12.6#, L-00 DWC, .0152 bpf, ID = 3.958 11461'
- - - - - - - - -
L4(OA)---------------;
- - - - - - - - - - - -
LS (OA) LEM WINDOW 67°
ORIGINAL COMPLETION
5849'-5862'
JMD
DRLG HO CORRECTIONS
OPENING WIDTH= 3.33"
5902'
7-0/8'X5-12' BKR ZXP LTP w/HGR 6TIEBK, ID = 6.530'
5921'
19 12' SEAL BORE EXTENSION, D = 4.75"
5941'
5-12' X4-12' XO, ID = 3.950'
4-12' SLTD LNR, 12.6#, L-80 DWC, .0152 bpf, ID = 3-9587—E12961'
- - - - - - - - - - - - - - - - - - - - -
L3 (OBa)
L4 (OBa) LEM WINDOW 69°
JNL/JMD
ADDED REF, BF ELEV & COND INFO
6007'-6020'
6060'
11
OPENING WIDTH= 3.33"
75/8-X 5-12- BKR ZXP LTP w/ HGR &TiEBK, ID =4.810'
6093' 1-119' SEAL BORE EXTENSION, ID = 4.75"
I4-12" SLID LNR 12.6#�L-80 DWC, .0152 bpf, ID = 3.958 12777'
L_1 (OB_b_)
7480' 6' FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
4-12- SLTD LNR, 12.6#, L-80 DWC, .0152 bpf, ID = 3.9581413184-
----------------------
L2
13184-
- - - - - - - - - - - - - - - - - - - - - -,
` L2 OBc '
6876' 6- FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LNER)
DATE
REV BY
COMMENTS
DATE REV BY COMMENTS
11/17M9
P-272
ORIGINAL COMPLETION
12/03/19
JMD
DRLG HO CORRECTIONS
12/04/19
BG/JMD
FINAL ODE APPROVAL
12/12/19
TS/JMD
GLV C/O (12/02/19)
12/17/19
JNL/JMD
ADDED REF, BF ELEV & COND INFO
11
POLARIS UNIT
WELL: S-202, L1, L2, L3, & L4
PERMIT No: 219-120.(121),(122).(123).(124)
API No: 50-029-23647-00.(60),(61),(62),(63)
SEC 35, T12N, R12E, 3060' FSL & 4567' FEL
BP Exploration (Alaska)
North America - ALASKA - BP
Operation Summary Report
Page 1 of 55
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Datefrime: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
-- - - - (hr) -- -I - - (usft) _
9/22/2019 21:00 - 00:00 3.00 RIGID P PRE GENERAL RIG DOWN OPERATIONS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
RIG DOWN RIG FLOOR
SKID FLOOR
LAY OVER DERRICK (375K MAX)
RIG DOWN INTERCONNECTS
9/23/2019 0000 0300
3.00
MOB
P
PRE
SEPARATE MODULES AND PREPARE TO
_MOVE TO S -PAD
0300 0730
4.50
MOB
P
PRE
MOVE ALL THREE MODULES TO OXBOW
ROAD -5 MILES
OBSERVE SIGNIFICANT CRACKING IN THE
ROAD BEHIND LEAD MODULE (MUD MOD)
NEAR THE LANDFILL
DISCUSS PLAN FORWARD WITH RIG MOVE
COORDINATOR AND FIELD ENGINEER,
DECISION MADE TO LAY ADDITIONAL MATS
AROUND THE LANDFILLAREA, AFTER MATS
ARE IN PLACE MOVE MUD MOD TO DS07 AND
ASSESS THE ROAD TO DETERMINE IF MORE
MATS WILL NEED TO BE PLACED
0730 2200
14.50
MOB
P
PRE
STAGE RIG MODULES AND WAIT FOR
ADDITIONAL MATS TO BE LAYED IN FRONT
OF RIG
22:00 23:00
1.00
MOB
P
PRE
MOVE DRILL MOD AND UTILITY MOD UP TO
MUD MOD AT THE LANDFILL
23:00 00:00
1.00
MOB
P
PRE
LAY ADDITIONAL MATS IN FRONT OF MUD
MOD
9/24/2019 00:00 00:30
0.50
MOB
P
PRE
LAY ADDITIONAL MATS IN FRONT OF MUD
MOD
00:30 0230
2.00
MOB
P
PRE
MOVE MUD MOD TO DS07 AND INSPECT
ROAD
OBSERVE MINOR CRACKING IN THE ROAD
l
FROM MUD MOD IN 2 AREAS BETWEEN THE
LANDFILLAND DS07
DECISION MADE TO CONTINUE TO DS07
T—
WITH DRILL MOD AND UTILITY MOD
--- ---
02:30 05.00
2.50
MOB
P
PRE
MOVE DRILL MOD AND UTILITY MOD TO DS07
WITH THE MUD MOD AND CONTINUE WITH
THE RIG MOVE TO FLOW 3
OBSERVE SIGNIFICANT CRACKING AND
UPHEAVING OF ROAD
05:00 12:00
7.00
MOB
P
PRE
FIX ROAD AND LAY ADDITIONAL MATS
12:00 - 16:00
4.00
MOB
P
PRE
MOVE RIG TO BOC
ROAD BUCKLED UNDER DRILL MOD
LEAVING SIGNIFICANT HOLE IN THE ROAD,
DRILL MOD ABLE TO PULL OUT OF HOLE
16:00 20:00
4.00
MOB
P
PRE
FIX ROAD AND LAY ADDITIONAL MATS
POSITION 2 LOADED MAT TRUCKS AND
LOADER BETWEEN MUD MOD AND DRILL
MOD WITH TOOL SERVICE REP TO INSPECT
ROAD FOR POTENTIAL INTEGRITY ISSUES
AFTER THE MUD MOD PASSES
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 2 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
20:00 - 22:00 2.00
MOB P
PRE
MOVE RIG TO COLD STORAGE PAD
ROAD BUCKLED UNDER THE DRILL MOD IN
FRONT OF COLD STORAGE PAD DRILL MOD
22:00 00:00 2.00 MOB P
9/25/2019 00:00 13:30 13.50 MOB P
13:30 - 16:30 3.00 MOB P
16 30 - 22:30 6.00 MOB P
2230 23:00 0.50
23 00 2330 0.50
2330 00:00 0.50
9/26/2019 00:00 17:30 17.50
17:30 22.00 4.50
22:00 23:30 1.50
23:30 00:00 0.50
MOB P
MOB P
MOB P
UNABLE TO PULL OUT OF DEPRESSION IN
ROAD
MUD MOD ABLE TO REACH PRICE PAD
DEVELOP PLAN FORWARD, DECISION MADE
TO LAY MATS IN FRONT OF DRILL MOD,
PLACE SAND BAGS AND TIMBERS AS
NECESSARY TO RECOVER DRILL MOD AND
DRIVE ONTO RIG MATS. FIX THE ROAD AND
LAY RIG MATS TO PRICE PAD
PRE j RECOVER DRILL MOD FROM DEPRESSION IN
ROAD
PRE RECOVER DRILL MODULE
- SHIM AND CRIB DRILL MODULE WITH
LUMBER AND SAND BAGS
ATTEMPT TO PULL DRILL MODULE OUT WITH
2 CAT D8 DOZERS: UNABLE TO PULL DRILL
MODULE OUT
MOBILIZE 2 ADDITIONAL CAT D8 DOZERS
PULL DRILL MODULE OUT OF THE HOLE IN
ROAD WITH 4 CAT D8 DOZERS
GET DRILL MODULE UP ON RIG MATS
PRE REMOVE LUMBER AND SAND BAGS FROM
ROAD AND PREP ROAD FOR REPAIR.
MOVE DRILL MODULE ON RIG MATS, AND
STAGE ATPRICE PAD
PRE ROADS AND PADS WORKING TO REPAIR
DAMAGED SECTION OF ROAD BETWEEN
DRILL MODULE AND UTILITY MODULE
PRE LAY RIG MATS OVER REPAIRED SECTION OF
ROAD UP TO UTILITY MODULE
PRE MOVE UTILITY MODULE FORWARD TO COLD
STORAGE PAD AND STAGE SO THAT TRAFFIC
L CAN GETAROUND.
PRE WAIT ON MATS TO BE PLACED FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD
MOB P PRE WAIT ON MATS TO BE PLACED FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
MOB P -
MOB -P
MOB P
9/27/2019 100:00 - 04:00 4.00 MOB P
TO J -PAD
PRE MOVE MUD MODULE FROM PRICE PAD TO
N -PAD ACCESS ROAD
INSPECT ROAD: NO ISSUES NOTED
PRE TROUBLESHOOT MUD MODULE MOVING
i SYSTEM HYDRAULICS
PRE RESUME MOVING MUD MODULE TO
PLANNED STAGING AREAAT M -PAD ACCESS
ROAD - -
PRE MOVE DRILL MODULE AND UTILITY MODULE
FROM PRICE PAD TO PLANNED STAGING
AREAAT CC2A
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 3 of 55 1
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date 9/22/2019
End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Alive datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs Task
Code NPT
Total Depth Phase Description of Operations
- - :M
(hr) _
(usft)
04:00 00:00
20.00 OB
P
PRE WAIT ON MATS TO BE PICKED UP FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
TO J -PAD AND MOVED AHEAD TO BETWEEN
THE EASTAND CENTRAL CHANNELS OF THE
KUPARUK RIVER.
SIMOPS:
CLEAN RIG AND PERFORM PM
THROUGHOUT ALL 3 MODULES
9/28/2019 00:00 14:00
14.00 MOB
P
PRE WAIT ON MATS TO BE PICKED UP FROM
FRONTIER CORNER, AROUND LAKE AFRICA,
'TO J -PAD AND MOVED AHEAD TO BETWEEN
THE EAST AND CENTRAL CHANNELS OF THE
KUPARUK RIVER.
SIMOPS:
CLEAN RIG AND PERFORM PM
THROUGHOUT ALL 3MODULES -
14:00 20:00
6.00 MOB
P
PRE MOVE MUD MODULE FROM M -PAD ACCESS
ROAD ACROSS THE KUPARUK RIVER AND ON
TO S -PAD ACCESS ROAD.
SOFT ROAD CONDITIONS IN SEVERAL
SPOTS ON THE SPINE ROAD ON THE WEST
SIDE OF THE KUPARUK RIVER, BUCKLED
SEVERAL RIG MATS
- WILL REQUIRE DOUBLE MATTING IN
SEVERALAREAS PRIOR TO MOVING DRILL
MODULE ACROSS.
MOVE DRILL MODULE FROM CC2ATO M -PAD
AND STAGE THERE
20:00 23:00
3.00 MOB
P
PRE MOVE MUD MODULE ALONG S -PAD ACCESS
ROAD TO S -PAD AND ASSESS ROAD PRIOR
TO MOVING REMAINING MODULES
SOFT ROAD CONDITIONS ALL ALONG S -PAD
ACCESS ROAD
ACCESS ROAD WILL REQUIRE MATTING
PRIOR TO MOVING REMAINING MODULES
23:00 00:00
1.00 MOB
P
PRE MOVE MATSAND CREATE A STAGING AREA
ON WEST SIDE OF KUPARUK RIVER BRIDGE
FOR DRILL MODULE AND UTILITY MODULE
-I,
THAT WILL -ALLOW TRAFFIC TO PASS.
9/29/2019 00:00 01:00
1.00
MOB
P
PRE MOVE MATS AND CREATE A STAGING AREA
ON WEST SIDE OF KUPARUK RIVER BRIDGE
FOR DRILL MODULE AND UTILITY MODULE
01:00 04:30
--
3.50
MOB
P
f PRE
I THAT WILLALLOW TRAFFIC TO PASS.
MOVE DRILL MODULE FROM M -PAD TO
STAGING AREA ON WEST SIDE OF KUPARUK
RIVER
MOVE UTILTIY MODULE FROM CC2A TO
STAGING AREA ON WEST SIDE OF KUPARUK
RIVER_
04:30 15:30
11.00
MOB
P
PRE MOVE MATS FROM KUPARUK RIVER
CROSSINGS AHEAD OF RIG TO S -PAD
ACCESS ROAD.
15.30 19:00
3.50 MOB
P
PRE MOVE DRILL MODULE AND UTILITY MODULE
FROM STAGING AREA ON WEST SIDE OF
KUPARUK RIVER TO S -PAD ACCESS ROAD
19 00 22 00
3 00 MOB
P
PRE MOVE DRILL MODULE AND UTILITY MODULE
ALONG S -PAD ACCESS ROAD TO S -PAD.
Printed 12/17/2019 11 21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 4 of 55
Operation Summary Report
Common Well Name: S-202
MOB
P
PRE
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
SIMULATE ACTIVATING THE ESD AND
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
MOB
P
PRE
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To
Hrs
Task Code NPT Total Depth
Phase
Description of Operations
RISERS
(hr)
(usft)
22:00 - 00:00
2.00
MOB P
PRE
LOAD WELLHEAD EQUIPMENTAND
FLOW BOX
DIVERTER LINE INTO BOP DECK PRIOR TO
INSTALL FLOW LINE AND HOLE FILL LINES
SPOTTING DRILL MODULE OVER WELL —
9/30/2019 00:00 01:30
1.50
MOB P
PRE
CONTINUE TO LOAD WELL HEAD EQUIPMENT
CALIBRATE PITS WITH QUADCO REP
AND DIVERTER LINE INTO BOP DECK PRIOR
BUILD STANDS OF 5' DRILL PIPE WITH
TO SPOTTING DRILL MODULE OVER WELL
01 30 03.00
1.50
MOB P
PRE
SPOT DRILL MODULE OVER CONDUCTOR.
MOVE UTILITY MODULE AND M
ODULE
03.00 - 0530 2.50
UD M
INTO POSITION.
MOB P PRE 'GENERAL RIG UP OPERATIONS
MAKE UP ELECTRICAL CONNECTIONS
BETWEEN MODULES.
MAKE UP LINES IN INTERCONNECTS
RAISE MAST AND SKID RIG FLOOR TO DRILL
POSITION
MAX WEIGHT OFF HEADACHE RACK= 505
KLBS
0530 - 1100 5.50 MOB
ACCEPT RIG AT 05:30
P i PRE CONTINUE TO RIG UP
BEGIN OFF LOADING 8.6 PPG MAXDRIL-N TO
PITS
BRIDLE DOWN AND SECURE LINES IN
DERRICK
CALIBRATE BLOCKS
NIPPLE UP DIVERTER SYSTEM
11:00 - 13:00 2.00
MOB
P
PRE
HOLD PRE -SPUD AND RIG EVACUATION
DRILLS WITH BOTH CREWS
SIMULATE ACTIVATING THE ESD AND
SHUTTING DOWN THE BACK UP POWER
SYSTEMS PRIOR TO EVACUATING THE RIG
1300 1800 5.00
MOB
P
PRE
CONTINUE TO RIG UP
- NIPPLE UP DIVERTER AND KNIFE VALVE ON
RISERS
NIPPLE UP LOW PRESSURE RISERS AND
FLOW BOX
INSTALL FLOW LINE AND HOLE FILL LINES
INSTALL 4" VALVES ON CONDUCTOR
CALIBRATE PITS WITH QUADCO REP
BUILD STANDS OF 5' DRILL PIPE WITH
OFF-LINE STAND BUILDING EQUIPMENT
TEST GAS ALARMS
18:00 - 19:00 1.00
MOB
P
PRE
PERFORM DIVERTER FUNCTION TEST AND
KOOMY TEST
- KNIFE VALVE OPENED AT 20 SEC, ANNULAR
CLOSED AT 42 SEC.
AOGCC REPRESENTATIVE BRIAN BIXBY
WAIVED WITNESS AT 06:35 ON 09/30/2019
1900 2000 100
MOB
P I
PRE
LINE UP AND PRESSURE TEST MUD LINES TO
3500 PSI
20.00 21.30 1.50
MOB
P
PRE
PICK UPAND MAKE UP PARTIAL BHA#1,
13-1/2" DRILLING ASSEMBLY WITH 1.80AKO
MOTOR PER BAKER DD
VERIFY AKO ON MOTOR
MAKE UP 13-1/2" BAKER VMD -3 BIT, MOTOR,
STABILIZER AND XO TO NC50
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 5 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85 05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
21:30 23:00 1.50 MOB P 162.00 PRE
CLEAN OUT TO BASE OF CONDUCTOR AT 162'
MD
TAG ICE AND FILL AT 115' MD
400 GPM, 307 PSI ON/OFF BOTTOM
40 RPM, 1 KFT-LBS TORQUE ON/OFF
BOTTOM
7 KLBS WOB
PU 49 KLBS, SO 49 KLBS, ROT 49 KLBS
MUD WEIGHT IN/OUT = 8.6 PPG
23:00 00:00 1.00 DRILL P 200.00 SURF
SPUD WELLAND DRILL TO 200' MD TO MAKE
ROOM FOR MWD/GWD ASSEMBLY
400 GPM, 307 PSI ON/OFF BOTTOM
40 RPM, 1 KFT-LBS TORQUE ON/OFF
BOTTOM
7 KLBS WOB
PU 49 KLBS, SO 49 KLBS, ROT 49 KLBS
MUD WEIGHT IN/OUT = 8.6 PPG
RACK BACK HEAVY WEIGHT DRILL PIPE TO
MAKE UP REMAINDER OF BHA#1.
10/1/2019 00:00 04:30 4.50 DRILL P 200.00 SURF
MAKE UP BHA#1, 13-1/2" DRILLING
ASSEMBLY WITH 1.8° AKO MOTOR AND
MWD/GWD TO 155' MD
SCRIBE TOOL FACE ON MOTOR, ONTRAK
AND GYRODATA GWD
PLUG IN AND VERIFY ONTRAK
MAKE UP AND SCRIBE REMAINDER OF BHA
#1
04:30 05:00 0.50 DRILL P 200.00 SURF
SHALLOW HOLE TEST TOOLS AND TAKE
I
INITIAL GWD SURVEY AT 100' MD SURVEY
DEPTH. _
05:00 12:00 7.00 DRILL P 493.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 200' MD
TO 493' MD, 490' TVD.
550 GPM, 1080 PSI ON BOTTOM, 980 PSI OFF
BOTTOM
- 50 RPM, 1 KFT-LBS TORQUE ON BOTTOM, 1
KFT-LBS TORQUE OFF BOTTOM, 10 KLBS
WOB
PU 72 KLBS, SO 64 KLBS, ROT 68 KLBS
SURVEY EVERY 90' WITH GWD
MUD WEIGHT IN/OUT = 8.6 PPG
SIGNIFICANT RUNNING PEA GRAVEL
OUTSIDE OF CONDUCTOR AND FILL ON
BOTTOM
INCREASED MUD RHEOLOGY TO SLIGHTLY
ABOVE TARGET TO HELP CONTROL (PV:
12-18, YP: 90-130)
LOST 728 BBLS WHILE DRILLING FROM 162'
TO 490' M D
- SOME WATER FLOW IN S-126 CONDUCTOR
NOTED: NOTIFIED PAD OPERATOR
- LOSSES HEALED UP WITH INCREASE IN
MUD RHEOLOGY AND INCREASE IN CLAY IN
CUTTINGS
- WATER FLOW IN S-126 STOPPED AFTER
LOSSES HEALED UP
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 6 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DWO019CM-EX-DI-DN- (16,199,881.00 )
-
- - --
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
- - -
—
IBPUOI:
-
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To I Hrs Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
12:00 00:00 12.00 DRILL P
1,570.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 493' MD
TO 1570' MD, 1557' TVD
- 550 GPM, 1475 PSI ON BOTTOM, 1390 PSI
OFF BOTTOM
50 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 3
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 104 KLBS, SO 99 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
CONTINUE TO TAKE GYRO SURVEYS WITH
GWDAS REQUIRED
MUD WEIGHT IN/OUT = 8.7/8.8 PPG
MWD SURVEYS CLEANED UP AND 3RD
CONSECUTIVE CLEAN SURVEY MATCHING
GWD WAS AT 1457'
10/2/2019 00:00 07:30 7.50 DRILL P
1,990.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 1570' MD
TO 1990' MD
550 GPM, 1800 PSI ON BOTTOM, 1395 PSI
OFF BOTTOM
50 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 3
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 110 KLBS, SO 100 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
MUD WEIGHT IN/OUT = 8.8 PPG
07:30 08:30
1.00 DRILL P
1,990.00
SURF
CIRCULATE 2 X BOTTOMS UP
-600 GPM @ 1750 PSI
-50 RPM @ 3K TORQUE
-RACK BACK STAND EVERY 20 MINUTES
-MONITOR WELL FOR 10 MINUTES, STATIC
08.30 10:00 1.50 DRILL P
1,990.00
SURF
POOH ON ELEVATORS FROM 1800' TO 216'
i
-PU WT 83K, SO WT 78K @ 1000'
-MUD WT IN AND OUT 8.9 PPG.
10.00 12 00 2.00 DRILL
P
1,990.00 SURF
RIH WITH 13 1/2" DRILLING BHA FROM 216' TO
1990' MD
-TIGHT SPOT 1655' TO 1690'20K DOWN WT
-DRILL
-WASH LAST STAND TO BOTTOM
12 00 0000 12.00
P
2,724.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 1990' MD
TO 2724' MD
600 GPM, 2200 PSI ON BOTTOM, 1830 PSI
OFF BOTTOM
- 50 RPM, 9 KFT-LBS TORQUE ON BOTTOM, 6
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 133 KLBS, SO 99 KLBS, ROT 112 KLBS
SURVEY EVERY 90', SURVEY EVERY 30' FOR
DOGLEGS >5 DEG/ 100'
MUD WEIGHT IN/OUT = 8.9 PPG
10/3/2019 00:00 07 30 7.50 DRILL P
3,135.00 SURF
DRILL 13-1/2" SURFACE HOLE FROM 2724' MD
TO TMD
600 GPM, 200 PSI ON BOTTOM, 1870 PSI OFF
BOTTOM
- 50 RPM, 7 KFT-LBS TORQUE ON BOTTOM, 5
KFT-LBS TORQUE OFF BOTTOM, 10-25 KLBS
WOB
PU 1 KLBS, SO 110 KLBS, ROT 120 KLBS
SURVEY EVERY 90', SURVEY EVERY 30' FOR
DOGLEGS >5 DEG/ 100'
- MUD WEIGHT IN/OUT = 9.1 PPG
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 7 of 55
Operation Summary Report
Common Well Name: S-202
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
AFE No
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time:
9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER
DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
07:30
0930
2.00
DRILL
P
3,135.00
SURF
CBU x 3
-650 GPM, 2100 PSI
-50 RPM, 5K TO
-RACK BACK 1 STD EVERY 30 MIN
-FLOW CHCECK FOR 15 MIN, STATIC
09:30
11:00
1.50
DRILL
P
3,135.00
SURF
POOH ON ELEVATORS 2900-1830
-15K DRAG 2510-2475, WORK THRU ONCE
THEN OK
-TAKE CHECK SHOT SURVEYS X 4 TO CHECK
>7 DEG DOG LEGS @ 2272. 2240, 2209, 1736
SURVEY DEPTHS
-MUD WT 9.0 PPG IN AND OUT
11:00
12:00
1.00
DRILL
P
3,135.00
SURF
RIH 1830-3135
-RIH ON ELEVATORS
-OBSERVED DRAG 20-40K @ 2515-2550;
2790-2825, 2890-2910
- TAG BTTM NO FILL
12:00
14:00
2.00
DRILL
P
3,135.00
SURF
CBU X 2
-650 GPM, 50 RPM,2050 PSI, 5K TO
-_RACK BACK 1 STD EVERY 20 MIN.
14:00
16:30
2.50
DRILL
P
3,135.00
SURF
POOH F/ SURFACE CSG
-MUD WT 9.0 PPG IN AND OUT
-MONITOR WELL FOR 10 MIN,STATIC
16:30
19:00
2.50
DRILL
P
3,135.00
SURF
LAY DOWN SURFACE HOLE BHA
-PJSM
-CLEAN CLAY OFF BHA COMPONENTS
19:00
19:30
0.50
DRILL
P
3,135.00
SURF
CLEAN AND CLEAR RIG FLOOR
1930
2030
1.00
CASING
P
3,135.00
SURF
RIG UP TO RUN 10 3./4" CASING
-PJSM
-RIG UP VOLANT CASING RUNNING TOOL
20:30
21:00
0.50
CASING
P
3,135.00
SURF
LUBRICATE RIG
21:00
0000
3.00
CASING
P
3,135.00
SURF
RUN 10 3/4", 45#, L-80 CASING FROM
SURFACE TO 569'
-MAKE UP SHOE TRACK WITH 2 SPACE OUT
PUPS
-BREAK COLLAR OFF SPACE OUT PUPS AND
BAKER LOK
-CHECK FLOATS, GOOD.
-USE JET LUBE SEAL GAURD ON VAM 21
CONNECTIONS
-TORQUE TURN TO 26,250 FT/LBS
-FILL EVERY JOINT
-CIRCULATE EVERY 10TH JOINT 10 BPM FOR
5 MINUTES
-PU WT 56K, SO WT 56K
-MUD WT 9.0 PPG IN AND OUT
10/4/2019 00:00
08:00
8.00
CASING
P
3,135.00
SURF
RUN 10 3/4", 45#, L-80 CASING 569 TO 3128'
-LANDED ON LANDING RING.
-USE JET LUBE SEAL GAURD ON VAM 21
CONNECTIONS
-TORQUE TURN TO 26,250 FT/LBS
-FILL EVERY JOINT
-CIRCULATE EVERY 10TH JOINT 10 BPM FOR
5 MINUTES
-PU WT 150K, SO WT 105K @ 3128
-MUD WT 9.1 PPG IN AND OUT
**All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 8 of 55 1
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
— — —
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Daterrime: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85 05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
Y08:00 - 12:00 4.00 CASING P 31135.00 SURF
CIR & CONDITION MUD FOR CSG
-CIR AT 10 BPM/ 330 PSI, 29% RETURNS
-RECIPROCATE PIPE 15 FTAT 1000 FPM
-PREP TO CMT, RU SLB CMTRS. REDUCE WT
TO 9.1, 18 YP; 13 PV
-PJSM W/ ALL PERSONNEL
- RIG UP AND BLOWAIR TO SLB CEMENTERS
1200 1700 5.00 CASING P 3,135.00 SURF
'CMT 10 3/4 CSG:
-PRESSURE TEST 3500 F/ 5 MIN
-PUMP 104 BBLS 10 PPG MUD PUSH @ 6 BPM;
100 PSI
-UN-STING VOLANT AND LAUNCH BOTTOM
PLUG
-PUMP 540 BBLS (1587 SKS) 11 PPG, LEAD
CMT @ 6 BPM (YIELD 1.91 CU FT/SK)
-PUMP 56.2 BBLS (256 SKS) 15.8 PPG TAIL
CMT @ 6 BPM (YIELD 1.16 CU FT/SK)
-DROP TOP PLUG
-RECIPROCATED 18' AT SURFACE WHILE
PUMPING CMTAT 6 BPM UNTIL MUD PUSH TO
SURFACE
-PERFORM DISPLACEMENT WITH RIG PUMPS
-220 BBLS AT 10 BPM: ICP 560 PSI, 13%
RETURNS, FCP 860 PSI, 13% RETURNS
'50 BBLS DISPLACED AT 7 BPM: ICP 650 PSI,
9% RETURNS, FCP 700 PSI, 9% RETURNS
10 BBLS DISPLACED AT 3 BPM: ICP PSI, 10 %
I
RETURNS, FCP 700 PSI, 10% RETURNS
BUMP PLUG TO 1200 PSI, HOLD FOR 5 MIN,
BLEED OFF & OBSERVE FOR 10 MIN, NO
BACK FLOW.
-BTTM PLUG BURSTAT 400 PSI ABOVE PUMP
PRESSURE AT 280 BBLS LEAD CMTAWAY,
PUMP ADDITIONAL 60 BBLS LEAD THEN
SWITCH TO TAIL.
-OBSERVED GOOD CMT AT SURFACE @ 85
BBLS DISPLACEMENT, CIR OUT 205 BBLS
GOOD CMT.
-TOTAL LOSSES 35 BBLS
CMT WET 13:22
CMT IN PLACE 16:22
CLEAN RIG AND RIG DOWN CEMENT
EQUIPMENT
DRAIN CEMENT RETURNS FROM STACK
SUCK OUT CELLAR
BACK OUT LANDING JOINT AND LAY DOWN
TO PIPE SHED
- DISCONNECT KNIFE VALVEAND FLUSH
DIVERTER ANNULAR AND STACK WITH
BLACK WATER PILL, WORKANNULAR
SEVERAL TIMES
- RIG DOWN CASING TOOLS FROM RIG
FLOOR
CLEAN AND CLEAR RIG FLOOR
-CLEAN SHAKER DECK AND PITS
Printed 12/17/2019 11.21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 9 of 55
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
117:00 - 22:30 5.50 BOPSUR P 3,135.00 SURF NIPPLE DOWN DIVERTER SYSTEM
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
- NIPPLE DOWN 20' DIVERTER LINE FROM
BACK OF BOP DECK
BREAK BOLTS ON RISER AND DIVERTER
,ANNULAR
- NIPPLE DOWN KNIFE VALVE AND DIVERTER
ANNULAR
MOBILIZE WELLHEAD TO BOP DECK
NIPPLE DOWN RISER
SIMOPS:
CLEAN PITS
REMOVE SPARE 10-3/4" CASING JOINTS
FROM SHED
REMOVE SURFACE HOLE BHA
COMPONENTS FROM SHED
MOBILIZE INTERMEDIATE BHA
COMPONENTS TO PIPE SHED
22:30 23:00 0.50 BOPSUR P
3,135.00
SURF LUBRICATE RIG
23.00 00:00 1.00 BOPSUR P
3,135.00
SURF NIPPLE UP FMC GEN 5 WELLHEAD PER FMC
REPRESENTATIVE
CLEAN AND STEAM SPEED HEAD AND
CASING SPOOL
j-ORIENTAND INSTALL WELLHEAD
10/5/2019 00 00 05:30 5.50 WHSUR P
3,135.00
SURF NIPPLE UP FMC GEN 5 WELLHEAD PER FMC
REPRESENTATIVE
CLEAN AND STEAM SPEED HEAD AND
CASING SPOOL
ORIENTAND INSTALL WELLHEAD
-TQ CSG HEAD X TBG SPOOL FLANGE
-TQ CSG HEAD TO HANGER
INSTALL OA VALVES & DBL BLOCK IA/OA
VALVES
-TEST VOID TO 1000 PSI
SIMOPS:
NIPPLE UP BOP STACK
NIPPLE UP HIGH PRESSURE RISER AND
SPACER SPOOL
NIPPLE UP BOP STACK
CHANGE UPPER RAMS TO 7 5/8" CASING
RAMS
NIPPLE UP FLOW RISER
-ATTACH TURNBUCKLES AND HOLE FILL
LINES
INSTALL MOUSEHOLE
NIPPLE UP CHOKE LINE -
05:30 08:30 3.00 BOPSUR P
3,135.00
SURF TQ HIGH PRESSURE RISER FLANGES, SET
TEST PLUG W/ 7 5/8 TEST JT. PURGE LINES,
FILL STACK, PERFORM SHELL TEST.
08:30 13:30 5.00 BOPSUR P
3,135.00
SURF PRESSURE TEST BOPE:
-TEST ANNULAR 4 & 5" TEST JTS, 3500 HIGH
250 LOW/ 5 MIN EACH
-TEST LOWER RAMS, 4 & 5" TEST JTS, 5K
HIGH/ 250 LOW/ 5 MIN EACH
-TEST CHOKE MANIFOLD, HCR CKAND KILL
LINES, 5K HOW, 250 LOW/ 5 MIN EACH
-TESTED ALARMS, PVT AND FLOW SHOW
-TEST WITNESSED BY JEFF JONES- AOGCC
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 10 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
13:30 14:00 0.50
WHSUR
P 3,135.00
SURF
I INSTALL WEAR BUSHING
-PULL TEST PLUG
-INSTALL LONG WEAR BUSHING 10" ID
14:00 17:30 3.50
CASING
P 3,135.00
SURF
9 7/8" BHA
-PU & RIHW/ 9 7/8 HYCALOG TKC66 PDC,
AUTO TRACK, ONTRACK, LITHOTRACK.
MAKE UP FILTER SUB, FLOAT SUB AND FLEX
COLLARS -
17:30 19:00 1.50
CASING
P 3,135.00
SURF
RUN IN THE HOLE WITH BHA#2 ON 5" DRILL
PIPE STANDS FROM 908' MD TO 2993' MD
SHALLOW HOLE TEST MWD TOOLS AT 910'
MD: GOOD TEST
FILL PIPE EVERY 20 STANDS
MONITOR WELL WITH HOLE FILLAND TRIP
TANK: GOOD DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
-PU/SO = 98K/128K @ 2900'
19:00 20:00 1.00
CASING
P 31135.00
SURF
CIRCULATE BOTTOMS UP
-550 GPM @ 1420 PSI
2000 21:00 1.00
CASING
P 3,135.00
SURF
DISPLACE FROM 9.1 PPG MAX DRILL TO 9.3
PPG LSND
-650 GPM @1360 PSI
-ROTATE 50 RPM AND RECIPROCATE 90'
21:00 21:30 0.50
CASING
P 3,135.00
SURF
LUBRICATE RIG
21:30 00:00 2.50
CASING
P 3,135.00
SURF
HOLD DRILLS, WAIT ON CEMENT TO REACH
500 PSI
-WELL KILL DRILL WITH AAR
-FIRE DRILL
SIMOPS
-DERRICK INSPECTION
LOAD 4" PIPE INTO PIPE SHED.
10/6/2019 00 00 02 30 2.50
CASING
P 3,135.00
SURF
WELL KILL DRILL, WAIT ON CEMENT TO
REACH 500 PSI
_
_-PERFORM TOP DRIVE DROPS INSPECTION
02.30 03.30 1.00
CASING
P 3,135.000
SURF
RIG UP AND PRESSURE TEST CASING TO
3500 PSI FOR 30 MIN
- MUD WEIGHT IN/OUT = 9.3 PPG
PUMPED 3.8 BBLS BLED BACK 3.8 BBLS
LOST 35 PSI IN FIRST 15 MIN
LOST 10 PSI IN SECOND 15 MIN
TEST MET BP CRITERIA PER 100218
WSUPAPPROVED PRESSURE TEST
03:30 08:30 5.00
CASING
P 3,135.00
SURF
DRILL OUT FLOAT COLLAR AND CEMENT IN
I
SHOE TRACK FROM 2957' MD TO 3135' MD
750 GPM, 1810 PSI ON BOTTOM, 1740 PSI
OFF BOTTOM
60 RPM, 6 KFT-LBS TQ ON BOTTOM, 5
KFT-LBS TQ OFF BTM, 5-17 KLBS WOB
PU 125 KLBS, SO 100 KLBS, ROT 112 KLBS
MUD WEIGHT IN/OUT = 9.3 PPG
08 30 0900 0.50
CASING
P 3,155.00
SURF
DRILL 3135-3155' MD
- 750 GPM, 1810 PSI ON BOTTOM, 1740 PSI
OFF BOTTOM
- 60 RPM, 6 KFT-LBS TQ ON BOTTOM, 5
KFT-LBS TQ OFF BTM, 5-17 KLBS WOB
PU 125 KLBS, SO 100 KLBS, ROT 112 KLBS
MUD WEIGHT IN/OUT = 9.3 PPG
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 11 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
I BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
09:00 09:30 0 50 CASING P 3,155.00 SURF
CIRCULATE BOTTOMS UP BEFORE
PERFORMING LOT
750 GPM, 1740 PSI
MUD WEIGHT IN/OUT = 9.3 PPG
09:30 11:30 2.00 CASING P 3,155.00 SURF
RIG UP AND PERFORM LOT
MUD WEIGHT: 9.3 PPG, 2902' TVD, 3128' MD
PUMP 1.25 BBLS TO 357 PSI, BLEED BACK 1
BBLS
LOT EMW = 11.6 PPG
WSUP APPROVED LOT
11:30 2330 12.00 DRILL P 4,427.00 INTI
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 3155' MD TO 4427' MD, 4144' TVD.
1272' IN 12 HRS, ROP 106 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2070 PSI ON BOTTOM, 2050 PSI
OFF BOTTOM
120 RPM, 10 KFT-LBS TO ON BOTTOM, 9
KFT-LBS TO OFF BTM, 3-10 KLBS WOB
PU 174 KLBS, SO 112 KLBS, ROT 131 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL = 10.1 PPG, CLEAN = 9.94 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
PUMP 35 BBL HIGH -VS SWEEPS EVERY 500'
MD WITH 25% INCREASE IN CUTTINGS
- GASWATCH BACKGROUND RANGE = 50 TO
100 UNITS, MAX = 707 UNITS THROUGH COAL
SEAMS IN UG4 AND UG4A
23:30 00:00 0.50
DRILL P 4,427.00 INTI
LUBRICATE RIG
10/7/2019 00:00 12:00 12.00
DRILL P 5,824.00 INTI
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 4427' MD TO 5824' MD, 5082' TVD
1397' IN 12 HRS, ROP 116 FT/HR WITH
C
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2350 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
120 TO 150 RPM, 15 KFT-LBS TO ON
BOTTOM, 14 KFT-LBS TO OFF BTM, 15 KLBS
WOB
PU 217 KLBS, SO 120 KLBS, ROT 146 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL = 10.13 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
PUMP 35 BBL HIGH -VS SWEEPS AT 4688' MD
WITH 25% INCREASE IN CUTTINGS, 5161' MD
WITH 25% INCREASE IN CUTTINGS AND 5729'
MD WITH 75% INCREASE IN CUTTINGS
- GASWATCH BACKGROUND RANGE = 0 TO
50 UNITS, MAX AT 348 UNITS
SPR'S AT 5545' MD, 4955' TVD
MP#1- 30 SPM= 160 PSI, 40 SPM= 220 PSI
MP#2- 30 SPM= 170 PSI, 40 SPM= 210 PSI
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 12 of 55
Operation Summary Report
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
12:00 - 22:00 10.00
DRILL P 6,742.00 INT1
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 5824' MD TO 6742' MD, 5287' TVD
918' IN 10 HRS, ROP 92 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2360 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
75 TO 150 RPM, 16 KFT-LBS TQ ON BOTTOM,
15 KFT-LBS TO OFF BTM, 15 KLBS WOB
* ATTEMPT TO REDUCE VIBRATION BY
TURNING SOFT SPEED OFF WITH NO
SUCCESS
PU 209 KLBS, SO 116 KLBS, ROT 140 KLBS
SURVEY EVERY - 90 FT
1- ECD: ACTUAL = 10.06 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
PUMP 35 BBL HIGH -VS SWEEPS AT 6115' MD
WITH 25% INCREASE IN CUTTINGS, AND
6742' MD WITH LESS THAN 25% INCREASE IN
CUTTINGS
- GASWATCH BACKGROUND RANGE = 0 TO
50 UNITS, MAX AT 391 UNITS
SPR'S AT 6742' MD, 5287' TVD
MP#1- 30 SPM= 180 PSI, 40 SPM= 240 PSI
MP#2- 30 SPM= 190 PSI, 40 SPM= 240 PSI
SIM OPPS WITH AD BUILD 4" STANDS OF DP
AND WORK 7-5/8" CASING
22:00 23 30 1.50 DRILL P 6,742.00 INT1
CIRCULATE BOTTOMS UP X 2 WITH SWEEP
DOWNLINK RIBS OFF
SURVEY ON BOTTOM
750 GPM, 2350 PSI
90 TO 100 RPM, 13 KFT-LBS
RECIPROCATE AT 750 FT/ HR
PU 193 KLBS, SO 116 KLBS
35 BBL HIGH -VIS SWEEP WITH 3%
-
INCREASE IN CUTTINGS_
23:30 00:00 0.50 DRILL P 6,742.00 INT1
LUBRICATE RIG
10/8/2019 00:00 02:30 2.50 DRILL P 6,742.00 j INT1
POOH ON ELEVATORS FROM 6742' MD TO
4322' MD
FLOW CHECK WELL, WELL IS STATIC
PU 209 KLBS, SO 116 KLBS
MUD WEIGHT IN/OUT = 9.3 PPG
PU 220 KLBS, SO 114 KLBS AT 6000' MD
30 KLBS OVERPULLAT 5493' MD
30 KLBS OVERPULLAT 4322' MD AND
-
OBSERVE WELL BEGIN TO SWAB
02'30 04:30 2.00 DRILL P 6,742.00 INTI
BACKREAM OUT OF HOLE FROM 4322' MD TO
3268' MD
750 GPM, 2030 PSI AT 4200' MD
60 RPM, 10 KFT-LBS TQ WITH 135 KLBS
ROTATING WEIGHT
- BACKREAMING SPEEDS FROM 750 FT/ HR
TO 1500 FT/ HR
* AFTER PULLING FIVE STANDS AND
BOTTOMS UPATTEMPTED TO PULL ON
ELEVATORS AT 3830' MD WITH NO SUCCESS
STILL SWABBING WITH NO OVERPULLS
Printed 12/17/2019 1121 21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 13 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85 05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
04:30 05:00 0.50
DRILL P
6,742.00
INT1
POOH ON ELEVATORS FROM 3270' MD TO
3080' MD
PU 155 KLBS
MONITOR WELL ON TRIP TANK
HOLE TAKING PROPER HOLE FILL
05:00 05:30 0.50
DRILL P
6,742.00
INT1
CIRCULATE BOTTOMS UP FROM 10-3/4"
CASING SHOE
750 GPM, 1900 PSI
RECIPROCATE 85' AT 1500 FT/ HR
FLOW CHECK WELL, WELL IS STATIC
05:30 06:30 1.00
DRILL P
6,742.00
INTI
SLIP AND CUT DRILLING LINE
CUT 68' OF DRILL LINE
CALIBRATE AMPHION SYSTEM
CHECK FLOOR SAVER / CROWN SAVER
06:30 07:30 1.00
DRILL P
6,742.00
INT1
TOP DRIVE INSPECTION
DERRICK INSPECTION
07:30 10:30 3.00
DRILL P
6,742.00
INTI
RIH W 9 7/8" DRILLING BHA FROM 3080-6742
-RIH ON ELEVATORS
-FILL PIPE EVERY 20 STDS
MUD WT IN 9.3 - MUD WT OUT 9.3
1030 1200 1.50
DRILL P
6,742.00
INT1
CIRCULATE AND CONDITION MUD
-750 GPM, 2360 PSI
-130 RPM, 13K TQ
-RECIPROCATE PIPE 60' @ 800 FT/HR
-PUMP HI -VIS SWEEP, 25% INCREASE IN
CUTTINGS.
`7 5/8 CSG ARRIVED - UNLOADED 22 JTS,
INSTALL IN PIPE SHED, STRAP, TALLY, DRIFT,
VAM REP INSPECT. UPDATE RUNNING TALLY.
12:00 12 30 0 50
DRILL P
6,764.00
INT1
DIRECTIONAL DRILL 9-7/8" INTERMEDIATE
HOLE FROM 6742' MD TO 6764' MD, 5287' TVD
- 22" IN .2 HRS, ROP 92 FT/HR WITH
CONNECTIONS
INSTANTANEOUS ROP <250 FT/HR
750 GPM, 2360 PSI ON BOTTOM, 2330 PSI
OFF BOTTOM
100 RPM, 15 KFT-LBS TQ ON BOTTOM, 4
KFT-LBS TQ OFF BTM, 10 KLBS WOB
- PU 209 KLBS, SO 116 KLBS, ROT 139 KLBS
SURVEY EVERY - 90 FT
ECD: ACTUAL = 10.06 PPG
MUD WEIGHT IN/OUT = 9.3 PPG
SPR'S AT 6742' MD, 5287' TVD
MP#1- 30 SPM= 180 PSI, 40 SPM= 240 PSI
MP#2- 30 SPM= 190 PSI, 40 SPM= 240 PSI
` SIM OPPS WITH AD BUILD 4" STANDS OF DP
j
AND WORK 7-5/8" CASING
—
12 30 13 30 1.00
DRILL P
6,764.00
INT1
CIR AND CONDITION HOLE FOR CASING.
-CBU X 1.5
750 GPM, 2360 PSI
-70-120 RPM, 13K TQ
-RECIPROCATE PIPE 60' @ 800 FT/HR
-PUMP HI -VIS SWEEP, 7% INCREASE IN
CUTTINGS.
-PU 221 K /SO 112K/ ROT 139K
`SIMOPS: BUILD 4" DP STANDS OFFLINE.
Printed 12/17/2019 11:21.21 AM
*'All depths reported in Drillers Depths"
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America
- ALASKA
- BP
Page 14 of 55
Operation Summary Report
Common Well Name. S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date:
9/22/2019
End Date:
11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85 05usft (above
Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
--
13:30 - 16:00
2.50
DRILL
P
6,764.00
INTI
POOH ON ELEVATORS FROM 6764' MD TO
3080' MD
-FLOW CHECK
-PU 221 KLBS
HOLE TAKING PROPER HOLE FILL
-FLOW CHECKAT SHOE
16:00 17:00
1.00
DRILL
P
6,764.00
INT1
POOH ON ELEVATORS FROM 3080' MD TO
990" MID
-FLOW CHECK AT BHA
MONITOR WELL ON TRIP TANK
HOLE TAKING PROPER HOLE FILL
17:00 19:00
2.00
DRILL
P
6,764.00
INT1
POOH /LAYDOWN BHA & BIT
i -LD JARS
RCK BACK 5" HWDP
-LD DIRECTIONAL & LOGGING BHA TOOLS
-BIT GRADE 3 -2 -BT -A -X -I -ER -TD_
19:00 19:30
0.50
CASING
P
6,764.00
INT1
: CLEAN AND CLEAR RIG FLOOR
PULL WEAR BUSHING
19:30 20:00
0.50
CASING
P
6,764.00
INTI
SERVICE RIG
:20:00 21:00
1.00
I CASING
P
6,764.00
INTI
RIG UP CASING RUNNING TOOLS
RIG UP VOLANT TOOL, BAIL EXTENSIONS
AND ELEVATORS
DOUBLE STACK TONGS
-FOSV AND XO
T -
-RU HOLE FILL LINE
21:00 00:00
3.00
CASING
P
800.00
INT1
RUN 7 5/8", 29.7#, L-80, VAMTOP HC,
INTERMEDIATE CASING TO 967' MD
CASING SHOE AT 3128' MD
CHECK FLOATS (HOLDING)
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
FT -LBS
- RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACK
FILL CASING EVERY 10 JOINTS
10/9/2019 00:00 04:00
4.00
CASING
P
6,764.00
INTI
RUN 7 5/8", 29.7#, L-80, VAMTOP HC,
INTERMEDIATE CASING TO THE SURFACE
CASING SHOE AT 3128' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
FT -LBS
RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACK
-
-FILL CASING EVERY 10 JOINTS_
04.00 04:30
0.50
CASING
P
6,764.00
INTI
CIRCULATE B/U AT 10 3/4" CSG SHOE
- 7 BPM, 225 PSI
04.30 13:30
9.00
CASING
P
6,764.00
INTI
CONTINUE RUNNING 7 5/8",29.7#, L-80,
VAMTOP HC, INTERMEDIATE CASING TO THE
SET DEPTH AT 6758' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 14,450
FT -LBS
RUN 1 FLOATING CENTRALIZERS ON
JOINTS 1-60 PLUS SHOE TRACK AND 113- 161
FILL CASING EVERY 10 JOINTS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 15 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
13:30 - 18:30 5.00 CASING P 6,764.00
INT1 CONDITION MUD TO CEMENTING
PROPERTIES
STAGE UP TO 7 BPM IN 1 BPM INCREMENTS
7 BPM, 470 PSI ICP, 400 PSI FCP
RECIPROCATE PIPE 15'
SIMOPS:
RIG UP SLB CEMENT EQUIPMENT
FILL LINES WITH WATER AND PRESSURE
TEST TO 3500 PSI FOR 5 MINUTES
READY TO PUMP CEMENT AT 18:30, SLB
NOTICED AIR LEAK ON PUMP TRUCK
~CONTINUE
18:30 20:00 1.50 CASING N 6,764.00
INT1 TO CIRCULATE WHILE WAITING IN
_
'SLB TO REPAIR AIR LEAK ON PUMP TRUCK
20:00 22:30 2.50 CASING P 6,764.00
INT1 CEMENT 7-5/8" INTERMEDIATE CASING AS
FOLLOWS:
PUMP 40 BBLS OF 12.5 PPG MUDPUSH II
SPACER @ 2-5 BPM, 200 PSI
RELEASE BOTTOM PLUG
PUMP 143 BBLS OF 15.8 PPG CLASS G TAIL
@ 6 BPM, EXCESS VOLUME 40% (YIELD 1.16
j
CU. FT/SK)
DROP TOP PLUG
RECIPROCATED PIPE 10 FTAT SURFACE
WHILE PUMPING CEMENT
PERFORM DISPLACEMENT WITH RIG PUMPS
AND 9.3 PPG LSND MUD PER SLB CADE
150 BBLS DISPLACED AT 10 BPM: ICP 315
PSI, FCP 315 PSI
136 BBLS DISPLACED AT 7 BPM: ICP 160 PSI,
FCP 1500 PSI, CATCH PRESSURE 176 BBL
INTO DISPLACEMENT
REDUCE RATE TO 3 BPM PRIOR TO PLUG
BUMP: FINAL CIRCULATING PRESSURE 1275
PSI
- BUMP PLUG AND INCREASE PRESSURE TO
1800 PSI, CHECK FLOATS - GOOD
- TOTAL DISPLACEMENT VOLUME 306.6 BBLS
(MEASURED BY STROKES @ 96% PUMP
EFFICIENCY)
RECIPROCATE PIPE 10 FTAT SURFACE
DURING DISPLACEMENT, STOPPED
RECIPROCATION AFTER MUDPUSH EXITED
THE SHOE DUE TO EXCESSIVE PICK UP
WEIGHTS
NO LOSSES
C I P AT 22:36
2230 2300 050 CASING P 6,764.00
INT1 CLOSE ANNULAR PREVENTER ON LANDING
JOINT AND ESTABLISH INJECTION DOWN THE
7-5/8" X 10-3/4" CASING ANNULUS
2 BPM, UP TO 780 PSI
INJECT 5 BBL
123:00 00:00 1.00 CASING P 6,764.00
INT1 LAY DOWN LANDING JOINTAND RIG DOWN
CASING RUNNING EQUIPMENT
10/10/2019 00:00 01:30 1.50 CASING P 6,764.00
INT1 RIG DOWN CASING RUNNING EQUIPMENT
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 16 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
'Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
01:30 - 04:00
2.50
CASING
P
6,764.00INT1
INSTALL 7-5/8" CASING PACKOFF
- PRESSURE TEST PACKOFF TO 3500 PSI
FOR 15 MIN
TEST APPROVED BY WOS (WSUP DOA)
SIMOPS:
CHANGE OUT UPPER RAMS TO 2-7/8" X 5"
VBRS
CHANGE OUT SAVER SUB TO HT -38
04.00 05:30
1.50
CASING
P
6,764.00
INT1
CHANGE OUT UPPER RAMS TO 2-7/8" X 5"
VBRS
CHANGE OUT SAVER SUB TO HT -38 -
05:30 08:30
3.00
CASING
P
6,764.00
INT1
PRESSURE TEST UPPER RAMS TO 250 PSI
LOW AND 3500 PSI HIGH FOR 5 MIN EACH
TEST WITH 4" AND 4-1/2" TEST JOINTS
08:30 09:30
1.00
CASING
P
6,764.00
INT1
'RIG DOWN TESTING EQUIPMENT
- PULL TEST PLUG AND SET WEAR BUSHING
1
(9„ ID)
--
09:30 14:00
4.50
CASING
P
-
6,764.00
-
INTI
- -
MAKE UP 6-3/4" PROD1 BHA TO TOTAL
LENGTH OF 15T MD
SIMOPS:
FREEZE PROTECT OA WITH 85 BBL OF 9.8
PPG BRINE AT 2 BPM, 900 PSI TO 700 PSI
SHUT IN OA WITH 500 PSI
14:00 19:00
5.00
CASING
P
6,764.00
INT1
RUN IN THE HOLE WITH 6-3/4" DRILLING BHA
ON 4" DP FROM 157' MD TO 6745' MD
SHALLOW TEST DIRECTIONAL TOOLS AT
400' MD
19:00 19.30
050
CASING
P
6,764.00
INT1
RIG UP TO PRESSURE TEST 7-5/8" CASING
19:30 20:30
1.00
CASING
P
6,764.00
INTI
- - - -
PRESSURE TEST 7-5/8" CASING TO 3500 PSI
FOR 30 MIN
TEST APPROVED BY WOS (WSUP DOA)
20:30 00:00
3.50
DRILL
P
6,764.00
INTI
WASH DOWN AT 2 BPM FROM 6475' MD, TAG
TOP OF CEMENT AT 6606' MD
- DRILL OUT FLOAT COLLAR AND CEMENT TO
6679' MD
- 225 GPM, 1220 PSI, 60 RPM, 8 KFT-LBS
TORQUE
10/11/2019 00.00 01:00
1.00
DRILL
P
6,764.00
INT1
DRILL OUT SHOE TRACK TO 6748' MD (10'
FROM SHOE)
300 GPM, 1780 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
MUD WEIGHT IN/OUT = 9.3 PPG
01:00 0230
1.50
DRILL
P
6,764.00
INT1
DISPLACE WELL FROM 9.3 PPG LSND TO 9.1
PPG QUICKDRIL-N
300 GPM, ICP 1850 PSI, FCP 1250 PSI
60 RPM, 8 KFT-LBS TORQUE
RECIPROCATE 80'
MONITOR WELL FOR 15 MIN (STATIC)
02:30 03.00
0.50
DRILL
P
6,764.00
INT1
DRILL OUT CEMENT AND FLOAT SHOE TO
6764' M D
300 GPM, 1225 PSI
60 RPM, 9 KFT-LBS TORQUE
5 KLBS WOB
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 15 MIN (STATIC)
Printed 12/17/2019 112121AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 17 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU - — Site: S
Rig Name/No.: PARKER 272 Spud Daterrime: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
- - 1 (hr) - (usft) -�
03:00 12:00 9.00 DRILL P 7,386.00 1 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 6764' MD TO 7386' MD
622 FT IN 9 HRS: 69 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1500 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 162 KLBS, SO 77 KLBS, ROT 107 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
-MUD WEIGHT IN/OUT = 9.1 PPG
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
12:00 00:00 12.00 DRILL P 8,240.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 7386' MD TO 8240' MD
854 FT IN 12 HRS: 71 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1650 PSI ON/OFF BOTTOM
100 - 130 RPM, 9 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 150 KLBS, SO 80 KLBS, ROT 104 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
10/12/2019 00:00 12:00 12.00 DRILL P 8,971.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 8240' MD TO 8971' MD
731 FT IN 12 HRS: 61 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1720 PSI ON/OFF BOTTOM
100 - 130 RPM, 9 KFT-LBS TORQUE ON, 8
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 172 KLBS, SO 72 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
PUMP 35 BBL HIGH VIS SWEEP AT 8280' MD,
10% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8850' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 18 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
--(hr) (usft)
12:00 00:00 1200 DRILL P 9,763.00 PROD1
DIRECTIONALDRILL 6-3/4" FROM HOLE
FROM 8971' MD TO 9763' MD
792 FT IN 12 HRS: 66 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1850 PSI ON/OFF BOTTOM
120 -150 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 168 KLBS, SO 70 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 9128' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9414' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9606' MD,
25% INCREASE IN CUTTINGS BACKAT
'SHAKERS
PERFORM WEEKLY BOPE FUNCTION TEST
10/13/2019 0000 1500 15.00 DRILL P 10,740.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 9763' MD TO 10740' MD
- 977 FT IN 15 HRS: 65 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1880 PSI ON/OFF BOTTOM
120 -130 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 175 KLBS, SO 35 KLBS, ROT 80 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 9891' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
UNABLE TO SLACK OFF WITHOUT
ROTATION DUE TO FRICTION, DECISION
MADE TO PULL OUT OF THE HOLE AND ADD
_
MORE PUSH PIPE BELOW THE HWDP
15'00 1830 3 50 DRILL P 10,740.00 PROD1
BACKREAM OUT OF THE HOLE FROM 10740'
MD TO 9411' MD
320 GPM, 1875 PSI
140 RPM, 12 KFT-LBS TORQUE
600-800 FPH PULLING SPEED
NO ISSUES WHILE BACKREAMING
MONITOR WELL FOR 10 MIN (STATIC)
OBSERVED A SIGNIFICANT AMMOUNT OF
FINE CUTTINGS AT SHAKERS WHILE
BACKREAMING
Printed 12/17/2019 11.21 21 AM "`All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 19 of 55
Common Well Name: S-202
I FROM 9411' MD TO THE 7-5/8" CASING SHOE
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
10 MN (STATIC)
22.00 - 23:00
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
320 GPM, 1600 PSI
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
- - - -
(usft)
-
18:30 - 22:00 3.50
DRILL P
10,740.00 PROD1
PULL OUT OF THE HOLE ON ELEVATORS
- PUMP 35 BBL HIGH VIS SWEEP AT 11027'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
I FROM 9411' MD TO THE 7-5/8" CASING SHOE
AT 6758' MD
BACKREAM TIGHT SPOTS AT 8515' MD AND
i 7470' MD
- MONITOR WELLAT THE CASING SHOE FOR
10 MN (STATIC)
22.00 - 23:00
1.00 DRILL P 10,740.00 PROD1
'CIRCULATE THE HOLE CLEAN
320 GPM, 1600 PSI
80 RPM, 7 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 10% INCREASE IN CUTTINGS
BACK AT SHAKERS
2300 0000 1.00 DRILL P
10,740.00 PROD1
PULL OUT OF THE HOLE ON ELEVATORS
FROM 6758' MD_TO 4600' MD
10/14/2019 0000 01:00 1.00 DRILL P 10,740.00
PROD1
PULL OUT OF THE HOLE RACKING BACK THE
HWDP FROM 4600' MD TO 3282' MD
MONITOR WELL FOR 10 MIN AT THE TOP OF
THE HWDP (STATIC)
01:00 05:30 4.50 DRILL P 10,740.00
PROD1
RUN IN THE HOLE ON ELEVATORS FROM
3282' MD TO BOTTOM AT 10740' MD
RUN ADDITIONAL 54 STANDS OF 4" DP
BELOW THE HWDP FOR A TOTAL OF 87
STANDS BELOW THE HWDP
WASH DOWN LAST STAND AT 2 BPM, 450
- -
PSI
05:30 12:00 6.50 DRILL P
11,154.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 10740' MD TO 11154' MD
414 FT IN 6.5 HRS: 64 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
PROGRAM
320 GPM, 1800 PSI ON/OFF BOTTOM
j
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 6 KLBS WOB
PU 175 KLBS, SO 40 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
VARY RPM AS NEEDED TO PREVENT
ERRATIC PIPE MOVEMENT ON SURFACE
- PUMP 35 BBL HIGH VIS SWEEP AT 11027'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 20 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
— (hr)
(usft)
12:00 - 00 00 12.00
DRILL P
11,827.00 PROD1
DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
10/15/2019 00:00 - 00:30 0.50 DRILL
00:30 - 17:30 17.00 DRILL
FROM 11154' MD TO 11827' MD
- 673 FT IN 12 HRS: 56 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
,PROGRAM
- 320 GPM, 1770 PSI ON/OFF BOTTOM
- 140 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 6 KLBS WOB
PU 148 KLBS, SO 73 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
- MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11315'
MD, 50% INCREASE IN CUTTINGS BACKAT
(SHAKERS
PUMP 35 BBL LOW VIS FOLLOWED BY 35
BBL HIGH VIS SWEEP AT 11595' MD, 100%
INCREASE IN CUTTINGS BACK AT SHAKERS
INCREASE LUBES TO 3% TO HELP WITH
DRAG (ADDED 1% NXS LUBE)
- PU WEIGHT REDUCED FROM 175 KLBS TO
.148 KLBS
- SO WEIGHT INCREASED FROM 40 KLBS TO
73 KLBS
- TORQUE REDUCED FROM 11 KFT-LBS TO 9
KFT-LBS
ERRATIC PIPE MOVEMENT ON SURFACE
} I REDUECED SIGNIFICANTLY
N 11,827.00 PROD1 TROUBLESHOOT MWD
- GAMMA SENSORS NOT RESPONDING ON
AZITRACK
- DISCUSS WITH TOWN GEO, DECISION
MADE TO CONTINUE DRILL WITH
'RESISTIVITY SENSORS
P 12,777.00 PROD1 DIRECTIONAL DRILL 6-3/4" PROD1 HOLE
FROM 11827' MD TO 12777' MD
- 950 FT IN 17 HRS: 56 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
IPROGRAM
320 GPM, 1830 PSI ON/OFF BOTTOM
140 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 5 KLBS WOB
PU 168 KLBS, SO 71 KLBS, ROT 108 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
- PUMP 35 BBL HIGH VIS SWEEP AT 11880'
MD, 100% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12177'
MD, 25% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12340'
MD, NO INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 21 of 55
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT
(hr)
17:30 - 19:30 2.00 DRILL P
19:30 - 23:00 3.50 DRILL P
23:00 - 00:00 1.00 DRILL P
10/16/2019 00:00 03:00 3.00 DRILL P
03:00 05.00 2.00 DRILL P
0500
- 12:30
7.50
DRILL
P
BOTTOMS UP
320 GPM, 1830 PSI
i
12:30
13 30
1.00
DRILL
P
13 30
1400
0.50
DRILL
P
14.00
15:00
1.00
CASING
P
15:00 - 22:00 700 CASING P
Total Depth Phase
(usft)
Description of Operations
12,777.00 PROD1
CIRCUALTE THE HOLE CLEAN WITH 2X
BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 50% INCREASE IN CUTTINGS
BACK AT SHAKERS
MONITOR THE WELL PRIOR TO PULLING
OFF BOTTOM FOR 10 MIN (STATIC)
12,777.00 PROD1
PULL OUT OF THE HOLE FROM 12150' MD TO
THE 7-5/8" CASING SHOE AT 6758' MD
MONITOR THE WELL AT THE CASING SHOE
FOR 10 MIN (STATIC)
- NO ISSUES PULLING THROUGH OPE_ N HOLE
12,77 0 PROD1
'CIRCULATE BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE _
12,777.00 PROD1
RUN IN THE HOLE ON ELEVATORS FROM
6758' MD TO BOTTOM AT 12777' MD
- NO ISSUES RUNNING THROUGH OPEN
HOLE
12,777.00 PROD1
CIRCULATE THE HOLE CLEAN WITH 2X
BOTTOMS UP
320 GPM, 1830 PSI
140 RPM, 9 KFT-LBS TORQUE
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 25% INCREASE IN CUTTINGS
BACK AT SHAKERS
- MONITOR THE WELL PRIOR TO PULLING
OFF BOTTOM FOR 10 MIN (STATIC)
12,777.00 PROD1
PULL OUT OF THE HOLE TO RUN LINER
FROM 12777' MD TO THE TOP OF THE
DIRECTIONAL BHA AT 157' MD
- MONITOR THE WELL FOR 10 MIN AT THE
CASING SHOE AND AT THE TOP OF THE BHA
(STATIC)
12,777.00 PROD1
LAY DOWN THE BHA
- BIT GRADE.2-2-IN GAGE
12,777.00 PROD1
CLEAN AND CLEAR THE RIG FLOOR
- FUNCTION TEST THE BLIND RAMS
12,777.00 PROD1
RIG UP CASING RUNNING TOOLS
- AIR SLIPS, DOUBLE STACK TONGS, AND
ELEVATORS -
12,777.00 PROD1
RUN 4-1/2",12.6#, L-80, VAMTOP AND DWC
PROD1 SLOTTED LINER TO TOTAL LENGTH
OF 5297' MD
- USE JET LUBE SEAL GUARD PIPE DOPE ON
VAM CONNECTIONS AND BEST -O -LIFE 2000
ON DWC CONNECTIONS
- TORQUE VAM CONNECTIONS TO 4440
FT -LBS AND DWC CONNECTIONS TO 6150
FT -LBS
- RUN 1 CENTRALIZER FREE FLOATING ON
EVERY OTHER JOINT
- PU 92K, SO 77K
MAKE UP LINER BILLETASSEMBLY
SIMOPS:
-PERFORMTOPJOBAROUNDTHE
CONDUCTOR, PUMP 15 BBL OF CEMENT
**All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 22 of 55
Common Well Name: S-202
'PLANNED SET DEPTH AT 12777' MD ON 4"
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
i H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
02:00 03:30 1.50 CASING P 12,777.00
Site: S
STAGE PUMP UP TO 5 BPM, 425 PSI PRIOR
Rig Name/No.: PARKER 272
TO DROPPING BALL TO CONFIRM FLOW PATH
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
AT 5 BPM, 425 PSI TO 500 STKS, LOWER RATE
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
TO SLACKOFF WEIGHT WITH NO SUCCESS
22:00 00:00
2.00
CASING P
12,777.00 PROD1
CONTINUE INI HOLE TO 10030' MD ON 4" DRILL
INCREMENTS AND WORK PIPE BETWEEN
PICK UP WEIGHTAND BLOCK WIEIGHTAT 35
PIPE
KLBS WITH NO SUCCESS
DISCUSS PLAN FORWARD WITH
PU 97K, SO 77K
10/17/2019 00:00 02:00
2.00
CASING P
12,777.00 PROD1
CONTINUE IN HOLE FROM 10030' MD TO
SIMOPS:
SLIP AND CUT DRILL LINE
PEFORM PREVENTATIVE MAINTENANCE
WORK ORDERS
- DERRICK INSPECTION
Printed 12/17/2019 11 21.21 AM **All depths reported in Drillers Depths`*
'PLANNED SET DEPTH AT 12777' MD ON 4"
DRILL PIPE
TAG BOTTOM 2X WITH 15 KLBS
PU 160 KLBS, SO 65 KLBS
02:00 03:30 1.50 CASING P 12,777.00
PROD1 ATTEMPT TO RELEASE FROM LINER
STAGE PUMP UP TO 5 BPM, 425 PSI PRIOR
TO DROPPING BALL TO CONFIRM FLOW PATH
DROP 1-1/4" PHENOLIC BALL, PUMP DOWN
AT 5 BPM, 425 PSI TO 500 STKS, LOWER RATE
TO 2 BPM, 250 PSI, BALL LANDED AT 622
STKS, CALCULATED = 839 STKS
- SET DOWN TO 65 KLBS, PRESSURE UP TO
2500 PSI, WORK PIPE FROM PICK UP WEIGHT
TO SLACKOFF WEIGHT WITH NO SUCCESS
STAGE PUMPS UP TO 4500 PSI IN 500 PSI
INCREMENTS AND WORK PIPE BETWEEN
PICK UP WEIGHTAND BLOCK WIEIGHTAT 35
KLBS WITH NO SUCCESS
DISCUSS PLAN FORWARD WITH
ANCHORAGE TEAM, DECISION MADE TO
PULL LINER TOP TO THE RIG FLOOR AND LAY
DOWN THE BILLET ASSEMBLY TO
TROUBLESHOOT
_ -
03:30 09 00 5.50 CASING
I- P
12,777.00 1
PROD1
---- -
PULL OUT OF THE HOLE FROM 12777' MD TO
THE TOP OF THE LINER AT SURFACE AT 5297'
MD
-INSPECT SETTING TOOL, BALL ON SEAT AS
EXPECTED, NO ISSUES OBSERVED
09:00 15:00 600 CASING N
12,777.00~II
PROD1 DISCUSS PLAN FOWARD WITH ANCHORAGE
TEAM, DECISION MADE TO RUN BILLET
ASSEMBLY WITH GS SPEAR
WAIT FOR SPEAR / BILLET ASSEMBLY TO
ARRIVE ON LOCATION
SIMOPS:
SLIP AND CUT DRILL LINE
PEFORM PREVENTATIVE MAINTENANCE
WORK ORDERS
- DERRICK INSPECTION
Printed 12/17/2019 11 21.21 AM **All depths reported in Drillers Depths`*
North America - ALASKA - BP
Operation Summary Report
Page 23 of 55
Common Well Name. S-202
SPEAR AND RUN IN THE HOLE FROM 5297'
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU
Site: S
- CIRCULATE 1 DP VOLUME WITH THE LINER
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
- CIRCULATE 1 DP VOLUME WITH LINER TOP
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
2175 PSI
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
- PERFORM ALL CIRCULATIONS WITH PIPE IN
(usft)
TENSION
15:00 - 21:30 6.50
CASING N
12,777.00 PROD1
MAKE UP NEW BILLETASSEMBLY WITH GS
Printed 12/17/2019 11:21:21AM ""All depths reported in Drillers Depths"
SPEAR AND RUN IN THE HOLE FROM 5297'
MD TO BOTTOM AT 12777' MD
FINAL PU 148 KLBS, SO 69 KLBS
BUMPER SUB OPEN AT 127 KLBS, CLOSED
AT 93 KLBS
- CIRCULATE 1 DP VOLUME WITH THE LINER
TOP AT THE 7-5/8" CASING SHOE AT 5 BPM,
2250 PSI
- CIRCULATE 1 DP VOLUME WITH LINER TOP
HALF WAY THROUGH OPEN HOLE AT 5 BPM,
2175 PSI
- CIRCULATE 1 DP VOLUME WITH LINER ON
BOTTOM AT 5 BPM, 2250 PSI
- PERFORM ALL CIRCULATIONS WITH PIPE IN
TENSION
SLACK OFF TO 65 KLBS WHILE
CIRCULATING AT 5 BPM, TAG BOTTOM AND
PICK UP TO RELEASE PAT 480'MDFFLINER
LINER
21:30 00:00 2.50 CASING P 12,777.00 PROD1
PULL OUT OF THE HOLE FROM 7480' MD TO
2840' MD AT MIDNIGHT
10/18/2019 00:00 01:30 1.50 CASING P 12,777.00 PROD1
PULL OUT OF THE HOLE FROM 2840' MD TO
SURFACE
- INSPECT RUNNING TOOL, NO ISSUES
OBSERVED
01:30 02:00 0.50 BOPSUR P 12,777.00 PROD2
CLEAN AND CLEAR RIG FLOOR
02:00 04:00 2.00 BOPSUR P 12,777.00 PROD2
RIG UP TO PRESSURE TEST BOPE
- PULL WEAR BUSHING AND INSTALL TEST
PLUG
RIG UP TEST JOINT
FILL LINES AND PURGE AIR FROM SYSTEM
04:00 08:30 4.50 BOPSUR P 12,777.00 PROD2
TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
- TEST WITH 4" AND 4-1/2" TEST JOINTS
-ALL TESTS CHARTED, SEE ATTACHED BOP
TEST CHARTS
- TEST WITNESS WAIVED BY AOGCC REP
LOU LAUBENSTEIN
08:30 09:30 1.00 BOPSUR P 12,777.00 PROD2
RIG DOWN TESTING EQUIPMENT
- PULL TEST PLUG AND SET WEAR BUSHING
(9" ID)
- BREAK DOWN TEST JOINT
BLOW DOWN ALL SURFACE LINES
09:30 12:30 3.00 DRILL P 12,777.00 PROD2
MAKE UP 6-3/4" PROD2 BHA TO TOTAL
LENGTH OF 157' MD
- SMITH AXEBLADE PDC BIT, AUTOTRAK
EXACT, MWD/LWD
1230 1730 5.00 DRILL P 7,292.00 PROD2
RUN IN THE HOLE WITH PROD2 DRILLING
BHA FROM 157' MD TO 7292' MD
- SHALLOW HOLE TEST THE DIRECTIONAL
TOOLS AT 200' MD AND 600' MD
- TAG OBSTRUCTION AT 7292' MD, ATTEMPT
TO WORK PAST OBSTRUCTION WITH UP TO
30 KLBS AND 6 BPM WITH NO SUCCESS
- DISCUSS PLAN FORWARD WITH
ANCHORAGE TEAM, DECISION MADE TO
PERFORM OPEN HOLE SIDETRACK AT
CURRENT DEPTH
Printed 12/17/2019 11:21:21AM ""All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 24 of 55
Common Well Name: 5-202
INCREASE ROP TO MAINTAIN BIT WEIGHT,
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU
Site: S
FROM 7348' MD TO 7444' MD
96 FT IN 2 HRS: 48 FT/HR ROP, LIMIT
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
(PROGRAM
260 GPM, 1075 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 4 KFT-LBS
BPUOI.
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
PU 115 KLBS, SO 89 KLBS, ROT 100 KLBS
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
— — -
- --
(usft)
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
17:30 00:00 6.50
DRILL P
7,292.00 PROD2
PERFORM OPEN HOLE SIDETRACK AT 7242'
10/19/2019 00:00 13:00 13.00 DRILL P
13:00 22:00 9.00 DRILL I P
'MD
- TROUGH UP TO 60', STAGING UP FROM 3'
TO 60' PER BAKER PROCEDURE
I-260 GPM, 1075 PSI
110 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
7,284.00 PROD2 PERFORM OPEN HOLE SIDETRACK FROM
7242' MD TO 7284' MD
TIME DRILL PER BAKER PROCEDURE
260 GPM, 1075 PSI
110 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
UNABLE TO ACHIEVE OPEN HOLE
SIDETRACK, DECISION MADE TO ATTEMPT
TO SIDETRACK OFF THE OBSTRUCTION AT
- 7292' MD —
7,348.00 PROD2 PERFORM OPEN HOLE SIDETRACK FROM
7284' MD TO 7348' MD
TIME DRILL PER BAKER PROCEDURE
260 GPM, 1075 PSI
100 RPM, 4 KFT-LBS TORQUE
PU 125 KLBS, SO 89 KLBS, ROT 98 KLBS
WHILE TIME DRILLING OBSERVE LOSS OF
BIT WEIGHT, DISCUSS WITH ODE AND
Printed 12/17/2019 11:21:21 AM **All depths reported in Drillers Depths**
INCREASE ROP TO MAINTAIN BIT WEIGHT,
OBSERVE INDICATION OF DEPARTURE FROM
PARENT WELLBORE WITH NEAR BIT
INCLINATION
2200 00 00 2.00 DRILL P 7,444.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 7348' MD TO 7444' MD
96 FT IN 2 HRS: 48 FT/HR ROP, LIMIT
INSTANTANEOUS ROP TO 120 FPH PER WELL
(PROGRAM
260 GPM, 1075 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 4 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 115 KLBS, SO 89 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5*, NO BACK
REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
10/20/2019 00:00 01:00 1.00 DRILL P 7,537.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 7444' MD TO 7537' MD
93 FT IN 1 HRS: 93 FT/HR ROP
260 GPM, 1075 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 4 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 115 KLBS, SO 89 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5°, NO BACK
REAMING AT CONNECTIONS
- MUD WEIGHT IN/OUT = 9.0 PPG
01 00 03:00 2.00 DRILL N 7,537.00 PROD2
PULL OUT OF THE HOLE ON ELEVATORS TO
THE SHOE AND RUN BACK TO BOTTOM
- CALIBRATE THE CALIPER INSIDE THE
CASING
EVALUATE THE SIDETRACK JUNCTION ON
THE WAY BACK IN THE HOLE (NO ISSUES
RUNNING BACK INTO THE SIDETRACK)
Printed 12/17/2019 11:21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 25 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
I Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor. PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
03'00 - 12:00 9.00
DRILL P
8,015.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
12:00 - 00:00 12.00 DRILL P
10/21/2019 00:00 12:00 12.00
DRILL P
FROM 7537' MD TO 8015' MD
478 FT IN 9 HRS: 53 FT/HR ROP, ADJUST
ROP AS NEEDED FOR DIRECTIONAL
CONTROL
320 GPM, 1400 PSI ON/OFF BOTTOM
110 RPM, 6 KFT-LBS TORQUE ON, 5 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 126 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 30', FOR DLS >5°, NO BACK
REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 7820' MD,
100% INCREASE IN CUTTINGS BACKAT
- --- LSHAKERS -
8,797.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 8015' MD TO 8797 MD
782 FT IN 12 HRS: 65 FT/HR ROP, ADJUST
ROP AS NEEDED FOR DIRECTIONAL
CONTROL
320 GPM, 1450 PSI ON/OFF BOTTOM
150 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 150 KLBS, SO 77 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 8110' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8393' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8677' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
9,470.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 8797' MD TO 9470' MD
- 673 FT IN 12 HRS: 56 FT/HR ROP, ADJUST
ROP AS NEEDED FOR DIRECTIONAL
CONTROL, 140 FPH MAX
320 GPM, 1600 PSI ON/OFF BOTTOM
140 RPM, 8 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 147 KLBS, SO 77 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 9058' MD,
75% INCREASE IN CUTTINGS BACK AT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9420' MD,
150% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11.21:21 AM **All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 26 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
- - - - (hr)
(--ft)
12:00 00:00
12.00 DRILL P
9,470.00 PROD2
DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 9470' MD TO 10465' MD
995 FT IN 12 HRS: 83 FT/HR ROP, LIMIT ROP
TO 140 FPH MAX
320 GPM, 1675 PSI ON/OFF BOTTOM
140 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 158 KLBS, SO 79 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 9606' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 9893' MD,
50% INCREASE IN CUTTINGS BACKAT
'SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 10179'
MD, 75% INCREASE IN CUTTINGS BACKAT
SHAKERS
10/22/2019 00:00 12:00 12.00 DRILL P 11,530.00 PROD2
'DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 10465' MD TO 11530' MD
1065 FT IN 12 HRS: 89 FT/HR ROP, LIMIT ROP
TO 140 FPH MAX
320 GPM, 1775 PSI ON/OFF BOTTOM
140 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 179 KLBS, SO 70 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 10465'
I MD, 50% INCREASE IN CUTTINGS BACKAT
ISHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 10743'
MD, 50% INCREASE IN CUTTINGS BACKAT
ISHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 11027'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 11318'
MD, 50% INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11:21 21 AM "All depths reported in Drillers Depths"`
North America - ALASKA - BP
Operation Summary Report
Common Well Name: S-202
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
Page 27 of 55
AFE No
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
12:00 00:00 12.00 DRILL P 12,261.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 11530' MD TO 12261' MD
731 FT IN 12 HRS: 61 FT/HR ROP, LIMIT ROP
TO 140 FPH MAX
10/23/2019 00.00 - 12:30
12.50 DRILL P
320 GPM, 1875 PSI ON/OFF BOTTOM
140 RPM, 11 KFT-LBS TORQUE ON, 10
' KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 178 KLBS, SO 67 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
PUMP 35 BBL HIGH VIS SWEEP AT 11600'
MD, 50% INCREASE IN CUTTINGS BACK AT
!SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 11885'
MD, 10% INCREASE IN CUTTINGS BACK AT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12165'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
13,189.00 PROD2 DIRECTIONAL DRILL 6-3/4" PROD2 HOLE
FROM 12261' MD TO 13189' MD
928 FT IN 12.5 HRS: 74.3 FT/HR ROP, LIMIT
ROP TO 140 FPH MAX
320 GPM, 1888 PSI ON/OFF BOTTOM
140 RPM, 11-13 KFT-LBS TORQUE ON, 12
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 195 KLBS, SO 65 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
- MUD WEIGHT IN/OUT = 9.1 PPG
- PUMP 35 BBL HIGH VIS SWEEP AT 12451'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
PUMP 35 BBL HIGH VIS SWEEP AT 12761'
MD, 50% INCREASE IN CUTTINGS BACKAT
– - — — SHAKERS
12.30 - 14.00 1.50 DRILL P 13,189.00 PROD2 DOWNLINK RIBS OFF AND CIRCULATE HOLE
CLEAN AT TD WITH A 40 BBL HI -VIS SWEEP
SURFACE TO SURFACE
- 320 GPM, 1888 PSI, 140 RPM, 12.5 KFT-LBS
'TORQUE
- 25% INCREASE IN CUTTINGS BACKAT
SHAKERS WITH SWEEP AT SURFACE
- MONITOR WELL FOR 10 MIN: STATIC
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 28 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
1 Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
- - —
------ -
14:00 21:30 7.50 DRILL P
L
13,189.00 PROD2
PLANNED WIPER TRIP: PULL OUT OF THE
HOLE FROM 13189' MD TO ABOVE THE 7-5/8"
SHOE
MONITOR WELL FOR 10 MINUTES: STATIC
PU 195 KLBS, SO 65 KLBS AT 13189' MD
MUD WT IN/OUT 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
TIGHT HOLE AT 12560' MD WITH UP TO 25
KLBS OVERPULL
BACKREAM FROM 12560' MD TO 12630' MD
CONTINUE TO PULL ON ELEVATORS FROM
12630' MD TO 11630' MD
TIGHT HOLE AT 11630' MD WITH UP TO 25
KLBS OVERPULL
BACK REAM FROM 11630' MD TO 11120' MD
CONTINUE TO PULL ON ELEVATORS FROM
11120' MD TO 6680' MD' MD
21:30 23:00 1.50 DRILL P 13,189.00 PROD2
CIRCULATE THE HOLE CLEAN AT THE 7-5/8"
SHOE WITH 2X BOTTOMS UP
320 GPM, 1318 PSI
MONITOR WELL FOR 10 MINUTES: STATIC
23:00 0000 1.00 DRILL P 13,189.00 PROD2
PLANNED WIPER TRIP: RUN IN THE HOLE
WITH 6 3/4" DRILLING BHA FROM 6758' MD TO
7537' MD
PU 139 KLBS, SO 85 KLBS AT 6758' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
SET DOWN 25 KLBS AT 7290' MD: SIDETRACK
JUNCTION
ATTEMPT TO WORK THROUGH SIDETRACK
JUNCTION SEVERAL TIMES WITHOUT
SUCCESS
WASH THROUGH JUNCTION AND INTO
SIDETRACK WITH 1 BPM, 232 PSI
CONTINUE TO RUN IN THE HOLE ON
ELEVATORS FROM 7345' MD TO 7537' MD
10/24/2019 00.00 03 30 3.50 DRILL P 13,189.00 PROD2
PLANNED WIPER TRIP: CONTINUE TO RUN IN
I
THE HOLE WITH 6 3/4" DRILLING BHA FROM
7537' MD TO 13189' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- PU 185 KLBS, SO 65 KLBS AT 13189' MD
TIGHT HOLE:
- 20 KLBS AT 11790' MD; 15 KLBS AT 12050' MD,
15 KLBS AT 12350' MD, 25 KLBS AT 12500' MD
- 12540' MD: 25-30 KLBS: HAD TO WORK PIPE
SEVERAL TIMES TO GET THROUGH
Printed 12/17/2019 11 21 21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 29 of 55
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
03:30 05:30 2.00
DRILL P 13,189.00 PROD2
CIRCULATE HOLE CLEAN AT TD PRIOR TO
PULLING OUT OF THE HOLE
CIRCULATE 2X BOTTOMS UP
320 GPM, 1976 PSI, 120 RPM, 11.5 KFT-LBS
TROQUE
SPOT 4% LUBE PILL IN OPEN HOLE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
SINIFICANT INCREASE IN CUTTINGS AT FIRST
BOTTOMS UP. HOLE CLEANED UP AFTER
1.5X BOTTOMS UP STROKES
05 30 13:30 8.00
DRILL P 13,189.00 PROD2
PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" DRILLING BHA FROM 13189' MD
TO 157' MD
MONITOR WELL FOR 10 MINUTES PRIOR TO
PULLING OFF BOTTOM AND AT 7-5/8" CASING
SHOE: STATIC
PU 185 KLBS, SO 65 KLBS AT 13186' MD
MUD WEIGHT IN/OUT = 9.1 PPG
PULL TO 12355' MD AND RUN BACK THROUGH
TO 12620' MD
NO ISSUES PULLING THROUGH OR
RUNNING BACK DOWN THROUGH TIGHT
SPOT OBSERVED ON WIPER TRIP
PULLABOVE JUNCTION TO 7260' MD AND
RUN BACK THROUGH TO 7339' MD
NO ISSUES PULLING THROUGH OR
RUNNING DOWN THROUGH SIDETRACK
JUNCTION
DROP 2.4" DRIFT ON STAND 69
1330 1500 1.50
DRILL P 13,189.00 PROD2
LAY DOWN 6-3/4" DRILLING BHA PER BAKER
DD/MWD
REMOVE SOURCES
LAY DOWN WORN AND DAMAGED BHA
COMPONENTS
-DULL BIT GRADE: 1 - 1 - NO - A - X - I - NO -
TD
15.00 15.30 0.50
CASING P 13,189 00 PROD2
RIG UP TO RUN 4-1/2" SLOTTED LINER
RIG UP DOYON CASING TONGS
VERIFY PIPE COUNT IN PIPE SHED
15.30 16:00 0.50
CASING P 13,189.00 PROD2
RIG SERVICE
- SERVICE TOP DRIVE AND RIG FLOOR
-
EQUIPMENT
1600 0000 8.00
CASING P 13,189.00 PROD2
RUN 4.5", 12.6#, L-80,SLOTTED DWC LINER TO
6001' MD
USE BEST OF LIFE 2000 PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZERS ON EVERY
OTHER JOINT
PU 99 KLBS, SO 78 KLBS AT 6001' MD
10/25/2019 00:00 0030 0.50
CASING P 13,189.00 PROD2
CONTINUE TO RUN 4.5", 12.6#, L-80,SLOTTED
DWC LINER FROM 6001' MD TO 6287' MD
USE BEST OF LIFE 2000 PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZERS ON EVERY
OTHER JOINT
Printed 12/17/2019 11:21:21 AM `*All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 30 of 55
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
00:30 01:30 1.00
CASING P 13,189.00
PROD2
MAKE UP BILLET, GS SPEAR, BUMPER SUB
AND CIRC SUB PER NORTHERN SOLUTIONS
REPRESENTATIVE
01:30 06:00 4.50
CASING P 13,189.00
PROD2
RUN IN THE HOLE WITH 4.5" SLOTTED LINER
ON 4" DRILL PIPE PER TALLY
FILL ON THE FLY WITH FILL UP HOSE
TAKE PICK UP AND SLACK OFF WEIGHTS
EVERY 5 STANDS
MUD WEIGHT IN/OUT = 9.1 PPG
NO ISSUES RUNNING THROUGH SIDETRACK
JUNCTION OR THROUGH 12600'
TAG BOTTOM AT 13185' MD (-4' HIGH) 2X
'WITH 5 KLBS.
PU 174 KLBS, SO 61 KLBS
OBSERVE BUMPER SUB OPEN AT 140 KLBS
'BREAK CIRCULATION AND RELEASE SPEAR
FROM BILLET PER NORTHERN SOLUTIONS
REPRESENTATIVE
TOP OF BILLET AT 6876' MD
06:00 10:00 4.00
CASING P 13,189.00
PROD2
PULL OUT OF THE HOLE ON ELEVATORS
WITH GS SPEAR AND BUMPER SUB FROM
6876' MD
-MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OUT OF THE HOLE: STATIC
PU 140 KLBS, SO 75 KLBS AT 6876' MD
MUD WEIGHT IN/OUT = 9.1 PPG_
10:00 11:00 1.00
BOPSUR P 13,189.00
PROD3
PERFORM WEEKLY BOP FUNCTION TEST
AND CHANGE WEAR RING TO 7" ID
11:00 13:00 2.00
DRILL P 6,876.00
PROD3
PICK UP AND MAKE UP BHA #5,6-3/4" PROD3
DRILLING ASSEMBLY PER BAKER DD/MWD
TO TOTAL LENGTH OF 157' MD
HYCALOG TKC56 PDC BIT, AUTOTRAK
EXACT, MWD/LWD
13:00 15:30 2.50
DRILL P 6,876.00
PROD3
RUN IN THE HOLE WITH PROD3 DRILLING
BHA FROM 157' MD TO 4414' MD
SHALLOW HOLE TEST THE DIRECTIONAL
TOOLS AT 500' MD
FILL PIPE EVERY 2000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
PU 83 KLBS, SO 79 KLBS AT 4414' MD
15:30 16:30 1.00
DRILL P 6,876.00
PROD3
SLIP AND CUT 60' OF DRILL LINE
_RECALIBRATE BLOCKS
16:30 18:00 1.50
DRILL P 6,876.00
PROD3
CONTINUE TO RUN IN THE HOLE WITH
PROD3 DRILLING BHA FROM 4414' MD TO TOP
'OF BILLETAT 6876' MD
MUD WEIGHT IN/OUT = 9.1 PPG
PU 127 KLBS, SO 85 KLBS AT 6820' MD
TAG TOP OF BILLET AT 6876' MD 5 KLBS
1800 00.00 6.00
STKOH P 6,876.00
PROD3
PERFORM OPEN HOLE SIDETRACK AT 6856'
MD PER BAKER DD
OBTAIN SURVEYS AT 6820' MDAND 6850' MD
TROUGH UP TO 30', STAGING UP FROM 3'
TO 30' PER BAKER PROCEDURE
300 GPM, 1257 PSI
120 RPM, 7 KFT-LBS TORQUE
PU 127 KLBS, SO 85 KLBS, ROT 99 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
Printed 12/17/2019 11 21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 31 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code I NPT Total Depth Phase
Description of Operations
(hr) I (usft)
10/26/2019 00:00 - 12:00 12.00 STKOH P 6,876.00 PROD3
PERFORM OPENHOLE SIDETRACK PER
BAKER DD FROM 6856' MD TO 6876' MD
TIME DRILL PER BAKER PROCEDURE
300 GPM, 1267 PSI
1-
100 RPM, 7 KFT-LBS TORQUE
12:00 00:00 12.00 DRILL P 7,637.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 6876' MD TO 7637' MD
- 761 FT IN 12 HRS: 63.4 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1465 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
'TORQUE OFF, UP TO 8 KLBS WOB
PU 149 KLBS, SO 78 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
600 UNITS, MAX AT 1323 UNITS
DRILL TO 6940' MD, PULL BACK UP ABOVE
SIDETRACK DEPTH OF 6871' MDAND RUN
BACK THROUGH WITH NO ISSUES
GASWATCH BACKGROUND GAS INCREASED
AT 7300' MD
- PUMP 35 BBL HIGH VIS SWEEP AT 7259' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 7549' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
10/27/2019 0000 0600 6.00 DRILL P 8,160.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 7637' MD TO 8160' MD
- 523 FT IN 6 HRS: 87.2 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1575 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 157 KLBS, SO 72 KLBS, ROT 98 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
600 UNITS, MAX AT 1110 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 7861' MD,
50% INCREASE IN CUTTINGS BACK AT
SHAKERS
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 32 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
06:00 - 12:00 6.00
DRILL P
8,605.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 8160' MD TO 8605' MD
445 FT IN 6 HRS: 74.2 FT/HR ROP WITH
CONNECTIONS
1- 320 GPM, 1575 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 160 KLBS, SO 70 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 100 TO
400 UNITS, MAX AT 1156 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 8133' MD,
75% INCREASE IN CUTTINGS BACK AT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8402' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
1200 - 17:00 5.00 DRILL P
1800 - 19 00 1.00 DRILL P
9,000.00 PROD3 'DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 8605' MD TO 9000' MD
395 FT IN 5 HRS: 79.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1620 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 162 KLBS, SO 73 KLBS, ROT 99 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 43 TO
140 UNITS, MAX AT 281 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 8705' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 8970' MD,
25% INCREASE IN CUTTINGS BACK AT
SHAKERS
9,000.00 PROD3 PULL OUT OF THE HOLE FROM 9000' MD TO
8400' MD TO REPOSITION HWDP IN STRING
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING: STATIC
PU 163 KLBS, SO 74 KLBS AT 9000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
TIGHT HOLE: PULL 30 KLBS OVER FROM 8520'
MD TO 8485' MD
BACKREAM FROM 8485' MD TO 8400' MD
320 GPM, 1630 PSI, 50 RPM, 9-12 KFT-LBS
TORQUE
9,000.00 PROD3 RUN IN THE HOLE ON ELEVATORS FROM
8400' MD TO 9000' MD
- PU 156 KLBS, SO 74 KLBS AT 8400' MD
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 33 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
19:00 - 00:00 5.00 DRILL P 9,514.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROHOLE
DS
FROM 9000' MD TO 9514' MD
514 FT IN 5 HRS: 102.8 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1783 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 8 KLBS WOB
PU 164 KLBS, SO 76 KLBS, ROT 103KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
300 UNITS, MAX AT 888 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 9322' MD,
25% INCREASE IN CUTTINGS BACKAT
SHAKERS
10/28/2019 00:00 06:00 6.00 DRILL P 10,000.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 9514' MD TO 1 0000'MD
486 FT IN 6 HRS: 81.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1895 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 169 KLBS, SO 69 KLBS, ROT 103 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 65 TO
365 UNITS, MAX AT 2290 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 9618' MD,
75% INCREASE IN CUTTINGS BACKAT
i
SHAKERS
- PUMP 35 BBL HIGH VIS SWEEP AT 9914' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
06:00 12:00 6.00 DRILL P 10,462.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 10000' MD TO 10462' MD
- 462 FT IN 6 HRS: 77.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1872 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 167 KLBS, SO 67 KLBS, ROT 106 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 110
UNITS, MAXAT 111 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 10282'
MD, 75% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 12/17/2019 11 21.21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 34 of 55
Common Well Name: 5-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date. 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:OO:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(h r) (usft)
12:00 00:00 12.00 DRILL P 11,506.00 PROD3 DIRECTIONAL DRILL 6-3/4' PROD3 HOLE
FROM 10462' MD TO 11 506'MD
- 1044 FT IN 12 HRS: 87.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1878 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 178 KLBS, SO 61 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 65 TO
410 UNITS, MAX AT 720 UNITS
PUMP 35 BBL HIGH VIS SWEEP AT 10576'
MD, 50% INCREASE IN CUTTINGS BACKAT
SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10844' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11125' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11409' MD, 50% INCREASE IN
_ CUTTINGS BACK AT SHAKERS
10/29/2019 00:00 06:00 6.00 DRILL P 12,000.00 J PROD3 DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
FROM 11506' MD TO 12000' MD
494 FT IN 6 HRS: 82.3 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1950 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 161 KLBS, SO 63 KLBS, ROT 105 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 58 TO
341 UNITS, MAX AT 810 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11723' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11975' MD, 50% INCREASE IN
{ CUTTINGS BACK AT SHAKERS
Printed 12/17/2019 11:21:21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 35 of 55
Operation Summary Report
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From- To 1 Hrs
Task Code NPT
Total Depth Phase
Description of Operations
- —(hr)
(usft)
06:00 - 13:30 7.50
DRILL P
12,641.00 PROD3
DIRECTIONAL DRILL 6-3/4" PROD3 HOLE
13:30 - 15:00 1.50 DRILL P
15:00 21:00 6.00 j DRILL P
21 00 - 22:00 1.00
22.00 - 0000 2.00
DRILL P
DRILL P
FROM 12000MD TO 12641' MD
- 641 FT IN 7.5 HRS: 85.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1940 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 8 KLBS WOB
PU 164 KLBS, SO 58 KLBS, ROT 105 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 38 TO
315 UNITS, MAX AT 415 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12362' MD, 50% INCREASE IN
_CUTTINGS BACK AT SHAKERS
12,641.00 PROD3 DOWNLINK RIBS OFF AND CIRCULATE HOLE
CLEAN AT TD WITH A 40 BBL HI -VIS SWEEP
SURFACE TO SURFACE
320 GPM, 2044 PSI, 140 RPM, 12.5 KFT-LBS
TORQUE
MUD WEIGHT IN/OUT = 9.1 PPG
50% INCREASE IN CUTTINGS BACKAT
SHAKERS WITH SWEEP AT SURFACE
MONITOR WELL FOR 10 MIN: STATIC
12,641.00 PROD3 PLANNED WIPER TRIP: PULL OUT OF THE
HOLE FROM 12641' MD TO ABOVE THE 7-5/8"
SHOE
MONITOR WELL FOR 10 MINUTES: STATIC
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
TIGHT HOLE AT 11600' MD WITH UP TO 20
KLBS OVERPULL
- BACKREAM FROM 11600' MD TO 10700' MD
AS NEEDED
CONTINUE TO PULL ON ELEVATORS FROM
10700' MD
12,641.00 PROD3 CIRCULATE THE HOLE CLEAN AT THE 7-5/8"
SHOE WITH 1X BOTTOMS UP
320 GPM, 1412 PSI
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL FOR 10 MINUTES: STATIC
PROD3 PLANNED WIPER TRIP: RUN IN THE HOLE
WITH 6-3/4" DRILLING BHA FROM 6740' MD TO
11126' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
NO ISSUES RUNNING IN THE HOLE
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 36 of 55 1
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Daterrime: 9/30/2019 11.00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
10/30/2019 00:00 - 01:00 1.00
DRILL P
12,641.00 PROD3
PLANNED WIPER TRIP: CONTINUE TO RUN IN
THE HOLE WITH 6 3/4" DRILLING BHA FROM
11126' MD TO 12641' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
01:00 03:30 2.50
DRILL P
12,641.00 PROD3
CIRCULATE HOLE CLEAN AT TD PRIOR TO
PULLING OUT OF THE HOLE
CIRCULATE 2X BOTTOMS UP
320 GPM, 1991 PSI, 120 RPM, 11 KFT-LBS
TORQUE
MUD WEIGHT IN/OUT = 9.1 PPG
SPOT 4% LUBE PILL IN OPEN HOLE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
SIGNIFICANT INCREASE IN CUTTINGS PRIOR
TO FIRST BOTTOMS UP. HOLE CLEANED UP
AFTER 1.5X BOTTOMS UP STROKES
03:30 10:30 7.00
DRILL P
12,641.00 PROD3
'PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" DRILLING BHA FROM 12641' MD
TO TOP OF BHA AT 156' MD
MONITOR WELL FOR 10 MINUTES PRIOR TO
PULLING OFF BOTTOM AND AT 7-5/8" SHOE:
STATIC
PU 185 KLBS, SO 61 KLBS AT 12641' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
NO HOLE ISSUES WHILE PULLING
DROP 2.4" OD DRIFT ON STAND #69 FOR
UPCOMING LINER RUN_
10:30 13:00 2.50
DRILL P
12,641.00 PROD3
LAY DOWN 6-3/4" DRILLING BHA PER BAKER
DD/MWD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING BHATHROUGH STACK STATIC
-REMOVESOURCES
- LAY DOWN WORN AND DAMAGED BHA
COMPONENTS
-DULL BIT GRADE: 1 - 2 - BT - H - X - I - NO -
TO
13 00 13 30 0.50
CASING P
12,641.00 PROD3
RIG UP TO RUN 4-1/2" SLOTTED LINER
RIG UP DOYON CASING TONGS
VERIFY PIPE COUNT IN PIPE SHED
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 37 of 55
Common Well Name: S-202
MD
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
RUN 4.5", 12.6#, L-80 VAMTOP SOLID LINER
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
TORQUE CONNECTIONS TO 4440 FT -LBS
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
OTHER JOINT
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
13:30 - 20:30 7.00
CASING P
12,641.00 PROD3
RUN 4.5", 12.6#, L-80 SLOTTED LINER TO 5784'
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths`*
MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
RUN 4.5", 12.6#, L-80 VAMTOP SOLID LINER
FROM 5784' MD TO 6523' MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 4440 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
RUN A TOTAL OF 79 CENTRALIZERS AND 80
STOP RINGS
20:30 21:30 1.00 CASING P 12,641.00
PROD3 MAKE UP BAKER SEAL BORE EXTENSION,
LINER HANGER AND LINER TOP PACKER
ASSEMBLY TO 6581' MD PER BAKER LINER
HANGER REPRESENTATIVE
21:30 00:00 2.50 CASING P 12,641.00
PROD3 CONTINUE TO RUN IN THE HOLE WITH 4.5"
SLOTTED/SOLID LINER ON 4"
DRILL PIPE PER TALLY FROM 6581' MD TO
11430' MD
RUN IN THE HOLE AT 90 FPM
PU 146 KLBS, SO 84 KLBS AT 11430' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- MUD WEIGHT IN/OUT = 9.1 PPG
CIRCULATE 25 BBLS (SOLID CASING VOLUME
PLUS 5 BBLS) AT THE 7-5/8" CASING SHOE
4 BPM, 165 PSI
10/31/2019 00 00 01:00 1.00 CASING P 12,641 00
PROD3 CONTINUE TO RUN IN THE HOLE WITH 4.5"
SLOTTED/SOLID LINER ON 4"
DRILL PIPE PER TALLY FROM 11430' MD TO
12641' MD
RUN IN THE HOLE AT 90 FPM
PU 155 KLBS, SO 81 KLBS AT 12641' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
01:00 02:00 1.00 CASING P 12,641.00
PROD3 DROP SETTING BALLAND SET LINER
HANGER / LINER TOP PACKER PER BAKER
LINER HANGER REPRESENTATIVE
- PRESSURE UP TO 2080 PSI AND SET LINER
HANGER
- SLACK OFF 100 KLBS AND CONTINUE TO
PRESSURE UP TO 4200 PSI TO SET LINER
TOP PACKER
- PICK UP AND SLACK OFF, OBSERVE DOG
SUB SHEAR WITH 70 KLBS, SET DOWN 90
KLBS
- PICK UP AND ROTATE AT 20 RPM, 2.5-5.5
KFT-LBS TORQUE, SET DOWN ON LINER 2X
WITH 70 KLBS TO VERIFY PACKER SET
- PULL RUNNING TOOL CLEAR OF LINER
HANGER / LINER TOP PACKER
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths`*
North America - ALASKA - BP
Operation Summary Report
Page 38 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881,00)
Project: PBU
i
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
_
02:00 04 30 2.50
CASING P
6,060.00
PROD3
PULL OUT OF THE HOLE AND LAY DOWN
LINER RUNNING TOOL FROM LINER TOP AT
6060' M D
MONITOR WELL FOR 10 MIN: STATIC
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
04:30 05:30 1.00
BOPSUR P
6,060.00
PROD3
RIG UP TO TEST BOP
MAKE UP TEST JOINTAND TEST MANIFOLD
PULL WEAR RING AND INSTALL TEST PLUG
FILL LINES AND PURGE AIR FROM SYSTEM
05:30 13:30 8.00
BOPSUR P
6,060.00
PROD3
TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
TEST WITH 4" AND 4-1/2" TEST JOINTS
ALL TESTS CHARTED
TEST WITNESS WAIVED BYAOGCC REP
GUY COOK
ONE FAIL PASS: UPPER IBOP FAILED TO
TEST.
CHANGE OUT UPPER IBOP AND RE -TEST
250/3500 FOR 5 CHARTED MIN EACH: GOOD
TEST
PULL TEST PLUG AND RE -INSTALL 7" ID
WEAR RING
1330 1400 0.50
BOPSUR P
6,060.00 I
PROD3
RIG DOWN TEST EQUIPMENT
1400 1800 4.00
STWHIP P
6,060.00
PROD3
MAKE UP WHIPSTOCKAND MILLING
ASSEMBLY PER BAKER FISHING
REPRESENTATIVE TO 498' MD
18:00 21:00 3.00
STWHIP P
6,060.00
PROD3
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
498' MD TO 6063' MD
FILL PIPE EVERY 2000' MD
SHALLOW HOLE TEST TOOLS AT 90' MD: 275
GPM, 950 PSI
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
PU 114 KLBS, SO 94 KLBS AT 6000' MD
21 00 22 30 1.50
STWHIP P
6,060.00
PROD3
ORIENT AND SET BAKER WHIPSTOCK PER
BAKER FISHING REP
ORIENT WHIPSTOCK TO 340° (20°LOHS)
WASH DOWN 250 GPM AND TAG TOP OF
LINER AT 6063' MD
SET WHIPSTOCK PER BAKER FISHING REP:
SET DOWN 10 KLBS TO SHEAR ANCHOR
PICK UP 10 KLBS OVER TO VERIFYANCHOR
SET
SLACK OFFAND OBSERVE MILLS SHEAR
FROM SLIDE WITH 35 KLBS
TOW 6007' MD
BOW 6020' MD
Printed 12/17/2019 11 :21:21 AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 39 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Site: S
Project: PBU
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
22:30 00:00 1.50
STWHIP P 6,060.00 PROD3
MILL WINDOW PER BAKER FISHING REP
FROM 6007' MD TO 6008' MD
250 GPM, 1260 PSI
80 RPM, 5-7 KFT-LBS TORQUE, ROT WEIGHT
104 KLBS
- MUD WEIGHT IN/OUT = 9.1 PPG
11/1/2019 00:00 10:00 10.00
STWHIP P 6,041.00 PROD4
MILL WINDOW PER BAKER FISHING REP
FROM 6008' MD TO 6041' MD
250 GPM, 1260 PSI
80-100 RPM, 5-10 KFT-LBS TORQUE
PU 131 KLBS, SO 91 KLBS, ROT 102 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
TOP OF WINDOW: 6007' MD
BOTTOM OF WINDOW: 6020' MD
MILLTO 6041' MD, UPPER GAUGE MILL 3'
INTO FORMATION.
DRIFT MILLS THROUGH WINDOW BOTH WITH
AND WITHOUT PUMPS SEVERAL TIMES TO
CONFIRM CLEAN.
1000 10 30 050
STWHIP
_
P 6,041.00 PROD4
CIRCULATE HOLE CLEAN
PUMP 25 BBL HIGH VIS SWEEP SURFACE
TO SURFACE
350 GPM, 1850 PSI
+I
100 RPM, 6 KFT-LBS TORQUE
10.30 13:30 3.00
STWHIP
P 6,041.00 PROD4
PULL OUT OF THE HOLE ON ELEVATORS
WITH WINDOW MILLING ASSEMBLY FROM
6007' MD TO 372' MD
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
PU 131 KLBS, SO 91 KLBS AT 6007' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
HOLD KICK WHILE TRIPPING DRILLAND AAR
WITH WOODS' CREW: CRT 1 MIN 42 SEC
13:30 15:00 1.50
STWHIP P 6,041.00 PROD4
PULLAND LAY DOWN MILLING ASSEMBLY
PER BAKER FISHING REPRESENTATIVE
MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BHA THROUGH STACK: STATIC
STAND BACK 4" HWDP
LAY DOWN MWD AND MILLS PER BAKER
PILOT MILL: 1/8" UNDER GAUGE
UPPER MILL: IN GAUGE
FLUSH STACK AND CLEAN AND CLEAR RIG
-
FLOOR -
15 00 1630 1.50
DRILL P 6,041.00 PROD4
MAKE UP AND RUN IN THE HOLE WITH BHA
#7,6-3/4", 1.8° AKO MOTOR ASSEMBLY TO
173' MD
ADJUST MOTOR BEND TO 1.8°
MAKE UP 6-3/4" HUGHES MILL TOOTH BIT,
MOTOR, STABILIZER, NAVIGAMMA, PULSER
AND FLEX COLLARS
Printed 12/17/2019 11. 21.21 AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 40 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
16:30 - 20:00 3.50 DRILL P 6,041.00 PROD4
RUN IN THE HOLE WITH 6-3/4" MOTOR
ASSEMBLY FROM 173' MD TO 5946' MD
SHALLOW HOLE TEST TOOLS AT 1100' MD:
GOOD
FILL PIPE EVERY 2000' MD
PU 130 KLBS, SO 84 KLBS AT 5946' MD
MONITOR WELL WITH HOLE FILL AND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- MUD WEIGHT IN/OUT = 9.1 PPG
20:00 00:00 4.00 DRILL P 6,167.00 PROD4
ORIENT BIT HIGH -SIDE AND RUN THROUGH
WINDOW
NO DRAG OBSERVED GOING THROUGH
WINDOW
DIRECTIONALLY DRILL 6-3/4" OBa PROD4
LATERAL BUILD SECTION FROM 6041' MD TO
6167' MD, 5205' TVD
- 126 FT IN 4 HRS: 31.5 FT/HR ROP WITH
CONNECTIONS
275 GPM, 1230 PSI ON/OFF BOTTOM
8 KLBS WOB
PU 136 KLBS, SO 87 KLBS
-SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
11/2/2019 00:00 04:30 4.50
DRILL P
6132900 PROD4
DIRECTIONALLY DRILL 6-3/4" OBa PROD4
LATERAL BUILD SECTION FROM 6167' MD TO
6329' MD, 5158' TVD
162 FT IN 4.5 HRS: 36.0 FT/HR ROP WITH
CONNECTIONS
275 GPM, 1320 PSI ON/OFF BOTTOM
45 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
i
TORQUE OFF, 8-15 KLBS WOB
PU 133 KLBS, SO 86 KLBS, ROT 103 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 17 TO
157 UNITS, MAX AT 302 UNITS
04 30 05 30 1 00 DRILL P 6,329.00 PROD4
CIRCULATE HOLE CLEAN, PUMP 35 BBL HIGH
VIS SWEEP SURFACE TO SURFACE
350 GPM, 1800 PSI
50 RPM, 6-7 KFT-LBS TORQUE
05:30 0900 350 DRILL P 6,329.00 PROD4
PULL OUT OF THE HOLE ON ELEVATORS
WITH 6-3/4" MOTOR ASSEMBLY FROM 6329'
MD TO TOP OF THE BHAAT 173' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
PU 133 KLBS, SO 86 KLBS AT 6329' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE PULLING: HOLE TAKING
PROPER FILL
2-4 KLBS ADDITIONAL DRAG NOTED WHILE
PULLING BHATHROUGH HIGH DOGLEG
SECTION OF THE BUILD
Printed 12/17/2019 11:21:21AM
**All depths reported in Drillers Depths"
North America - ALASKA - BP Page 41 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
09:00 - 09:30 0.50
DRILL P
6,329.00 PROD4
PULLAND LAY DOWN 6-3/4" MOTOR
09:30 - 1000 0.50 DRILL P
10:00 - 13:30 3.50 DRILL P
ASSEMBLY PER BAKER DD / MWD FROM 173'
MD
MONITOR THE WELL FOR 10 MIN: STATIC
PU 52 KBLS, SO 52 KLBS AT 172' MD
LAY DOWN MOTOR, STABILIZER,
NAVIGAMMA, PULSER AND FLEX COLLARS
-DULL BIT GRADE: 1 -I - WT - A- E - I -NO-
BHA
6,329.00 PROD4 CLEAN AND CLEAR RIG FLOOR
MOBILIZE TOOLS FOR 6-3/4" DRILLING
ASSEMBLY TO RIG FLOOR
6,329.00 PROD4 PICK UP AND MAKE UP BHA #5,6-3/4" PROD3
DRILLING ASSEMBLY PER BAKER DD / MWD
TO TOTAL LENGTH OF 156' MD
- SMITH X516 PDC BIT, AUTOTRAK EXACT,
MWD/LWD
PLUG IN AND VERIFY COMMUNICATION
LOAD SOURCES
PU 42 KLBS, SO 43 KLBS AT 153' MD
13:30 - 16:30 3.00 DRILL P 6,329.00 PROD4 RUN IN THE HOLE WITH PROD4 DRILLING
BHA FROM 156' MD TO 6024' MD
- SHALLOW HOLE TEST DD / MWD AT 1000'
MD
FILL PIPE EVERY 2000' MD
MUD WEIGHT IN/OUT = 9.1 PPG
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
- PU 127 KLBS, SO 87 KLBS AT 6024' MD
16:30 20:00 3.50 DRILL P 6,329.00 PROD4 OBTAIN CALIPER READINGS AND LOG FROM
6030' MD TO 6329' MD PER BAKER MWD
- TAKE VERIFICATION SURVEYS AT 6239' MD,
6270' MD AND 6301' MD
20:00 00:00 4.00 DRILL P 6,561.00 PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6329' MD TO 6561' MD
- 232 FT IN 4 HRS: 58.0 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1500 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 143 KLBS, SO 83 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 64 TO
158 UNITS, MAX AT 489 UNITS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 42 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881,00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
11/3/2019 00:00 05:00 6.00 DRILL P 6,930.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6561' MD TO 6930' MD
- 369 FT IN 7 HRS (END DAYLIGHT SAVINGS):
52.7 FT/HR ROP WITH CONNECTIONS
320 GPM, 1535 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 140 KLBS, SO 81 KLBS, ROT 99 KLBS
SURVEY EVERY 30' FOR DLS > 5°, EVERY 90'
FOR DLS < 5° AS REQUIRED
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 278
UNITS, MAX AT 560 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT6593' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT6890' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
06:00 12:00 6.00 DRILL P 7,352.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 6930' MD TO 7352' MD
422 FT IN 6 HRS: 70.3 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 6 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 143 KLBS, SO 82 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 310
UNITS, MAX AT 1057 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7186' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
12:00 00:00 12.00 DRILL P 8,143.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 7352' MD TO 8143' MD
- 791 FT IN 12 HRS: 65.9 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 7 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 140 KLBS, SO 82 KLBS, ROT 99 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 230 TO
600 UNITS, MAX AT 1245 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7446' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7728' MD, 100% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8015' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 43 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs
Task Code
NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
11/4/2019 00:00 - 06:00 6.00
DRILL P
8,500.00
PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 8143' MD TO 8500' MD
06'00 - 13 30 7.50 DRILL P
13:30 - 1430 1.00 DRILL P
14'30 - 15 30 1.00 DRILL P
357 FT IN 6 HRS: 59.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1690 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 145 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.0 PPG
GASWATCH BACKGROUND RANGE = 650
UNITS, MAX AT 938 UNITS
PUMP 70 BBLTANDEM LOW VIS / HIGH VIS
SWEEP AT 8310' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
9,058.00 PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 8500' MD TO 9058' MD
558 FT IN 7.5 HRS: 74.4 FT/HR ROP WITH
'CONNECTIONS
320 GPM, 1648 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 148 KLBS, SO 73 KLBS, ROT 99 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
450-700 UNITS, MAX AT 1315 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8590' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8792' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8970' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
9,058.00 PROD4 PULL OUT OF THE HOLE FROM 9058' MD TO
8396' MD TO POSITION HWDP IN STRING
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING: STATIC
PU 150 KLBS, SO 83 KLBS AT 9058' MD
MUD WEIGHT IN/OUT = 9.1 PPG
9,058.00 PROD4 RUN IN THE HOLE ON ELEVATORS FROM
8396' MD TO 9058' MD
PU 156 KLBS, SO 89 KLBS AT 9058' MD
Printed 12/17/2019 11:21:21AM "'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 44 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881 00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs 1 Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
_
15:30 00:00 8.50 DRILL P 9,702.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 9058' MD TO 9702' MD
644 FT IN 8.5 HRS: 75.8 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1821 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 162 KLBS, SO 77 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
390-840 UNITS, MAX AT 1363 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9234' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9515' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
11/5/2019 00:00 06:00 6.00 DRILL P 9,702.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 9702' MD TO 10200' MD
498 FT IN 6 HRS: 83.0 FT/HR ROP WITH
'CONNECTIONS
320 GPM, 1822 PSI ON/OFF BOTTOM
120 RPM, 9 KFT-LBS TORQUE ON, 8 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 154 KLBS, SO 74 KLBS, ROT 102 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
390-840 UNITS, MAX AT 1363 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9803' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10098' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
06.00 1200 6 00 DRILL P 10,557.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 10200' MD TO 10557 MD
357 FT IN 6 HRS: 59.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1800 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 8.5
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 160 KLBS, SO 75 KLBS, ROT 105 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
500-1100 UNITS, MAX AT 2060 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10370' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
Printed 12/17/2019 11.21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 45 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
12:00 00:00 12.00 DRILL P 11,366.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 10557' MD TO 11 366'MD
- 809 FT IN 12 HRS: 67.4 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1930 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 177 KLBS, SO 60 KLBS, ROT 103 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE _
300-450 UNITS, MAX AT 990 UNITS
10700' MD: 3% LEL IN AIR ALARM AT SHAKER
DECK. MADE NOTIFICATIONS PER WELL
MONITORING MATRIX. GAS DISSIPATED
QUICKLY AND LEL LEVELS DROPPED BACK
TO 0.
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10934' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11223' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
11/6/2019 00:00 1200 1200.DRILL P 12,325.00 PROD4
DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 11366' MD TO 12325' MD
959 FT IN 12 HRS: 80 FT/HR ROP WITH
CONNECTIONS
320 GPM, 2000 PSI ON/OFF BOTTOM
120 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 98 KLBS, ROT 104 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 1345 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11515' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 11800' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 46 of 55
Common Well Name: 5-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
- — -
--- —
12:00 20.30 8.50 DRILL P 13,022.00
PROD4 DIRECTIONAL DRILL 6-3/4" PROD4 HOLE
FROM 12325' MD TO 13022' MD
697 FT IN 8.5 HRS: 82 FT/HR ROP WITH
CONNECTIONS
320 GPM, 2050 PSI ON/OFF BOTTOM
120 RPM, 12 KFT-LBS TORQUE ON, 11
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 180 KLBS, SO 81 KLBS, ROT 103 KLBS
SURVEY EVERY 90'
NO BACK REAMING AT CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 400
UNITS, MAX AT 730 UNITS
INCREASE LUBE CONCENTRATION TO 3%
DUE TO AN INCREASE IN TORQUE AND DRAG
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12363' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 12644' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 13022' MD, 10% INCREASE IN
CUTTINGS BACK AT SHAKERS
2030 2230 2.00 DRILL P 13,022.00
PROD4 CIRCULATE HOLE CLEAN WITH 2X BOTTOMS
UP
350 GPM, 2250 PSI
140 RPM, 10 KFT-LBS TORQUE
RECIPROCATE FULL STAND
PUMP 35 BBL HIGH VIS SWEEP SURFACE
TO SURFACE, 10% INCREASE IN CUTTINGS
AT SHAKERS
22:30 00:00
1.50
DRILL P T j 13,022.00
_BACK
PROD4 PULL OUT OF THE HOLE FROM 13022' MD TO
10600' MD
-MONITOR WELL FOR 10 MIN (STATIC)
_ - OBSERVE_ -30 KLBS DRAG AT 10600' MD
11/7/2019 00 00 03:30 3.50 DRILL P 13,022.00
PROD4 PULL OUT OF THE HOLE FROM 10600' MD TO
THE TOP OF THE WINDOW AT 6007' MD
- BACKREAM 1 STAND FROM 10567' MD TO
10477' MD, 320 GPM, 120 RPM, 900 FPH
- OBSERVE 30-40 KLBS OVERPULLAT -6190'
MD AND 6135' MD
MONITOR THE WELL FOR 10 MIN AT THE
WINDOW (STATIC)
03 30 04:30 1.00 DRILL
P
13,022.00
PROD4 CIRCULATE BOTTOMS UP
350 GPM, 1550 PSI
80 RPM, 3 KFT-LBS TORQUE
NO CUTTINGS OBSERVED AT SHAKERS
04.30 - 11:00 6.50 DRILL P 13,022.00
PROD4 RUN IN THE HOLE TO BOTTOM AT 13022' MD
- OBSERVE DRAG FROM 10275' MD TO 10620'
MD
- BACKREAM FROM 10620' MD TO 10275' MD,
350 GPM, 140 RPM, 600 FPH
Printed 12/17/2019 11 21 21A "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 47 of 55
Common Well Name: S-202
PROD4 CIRCULATE BOTTOMS UP
350 GPM, 1350 PSI
AFE No
Event Type: DRL- ONSHORE (DON)
MONITOR WELL FOR 10 MIN (STATIC)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
- LAY DOWN WHIPSTOCKAND RETRIEVAL
Site: S
ASSEMBLY
- NOTE DIRECTION WHIPSTOCK CAME OUT
Project: PBU
OF THE HOLE
11:00 12:00 1.00 CASING P 13,022.00
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
11:00 14:00
3.00
DRILL P
13,022.00
PRO64
CIRCULATE HOLE CLEAN WITH 3X BOTTOMS
UP
350 GPM, 2400 PSI
140 RPM, 7 KFT-LBS TORQUE
OBSERVE SIGNIFICANT INCREASE IN
CUTTINGS BACK AT SHAKERS AT FIRST
BOTTOMS UP
CIRCULATE HIGH VIS / LOW VIS SWEEP
SUFACE TO SURFACE, NO INCREASE IN
CUTTINGS BACK AT SHAKERS
SPOT 280 BBL 4% LUBE PILL IN OPEN HOLE
MONITOR WELL FOR 10 MIN (STATIC)
14:00 20:00
6.00
DRILL P
13,022.00
PROD4
PULL OUT OF THE HOLE FROM TD AT 13022'
MD TO THE TOP OF THE BHAAT 157' MD
MONITOR WELL FOR 10 MIN AT THE
WINDOW AND AT THE TOP OF THE BHA
(STATIC)
OBSERVE 10-20 KLBS AT 6210' MD AND 6135'
-MD
_
20:00 21:30
1.50
DRILL
P
13,022.00
PROD4
LAY DOWN BHA FROM 157'MD TO SURFACE
_
BIT GRADE: 1 -1 -IN GAUGE
21 30 22:00
0.50DRILL
P
13,022.00
PROD4
CLEAN AND CLEAR RIG FLOOR
PERFORM WEEKLY BOPE FUNCTION TEST
22:00 23:00
1.00
CASING
P
13,022.00
PROD4
MAKE UP WHIPSTOCK RETRIEVAL ASSEMBLY
WITH BAKER MWD TO 373' MD
2300 00:00
1.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP TO 1320' MD
11/8/2019 00:00 02:00
2.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP FROM 1320'
L
MD TO 5100' MD
02:00 03:00
1.00
CASING P
13,022.00
PROD4
CUT AND SLIP DRILL LINE
RECALIBRATE BLOCK HEIGHT IN AMPHION
- - -
-
I
SYSTEM
03:00 04:00
1.00
CASING P
13,022.00
PROD4
RUN IN THE HOLE FROM 5100' MD TO THE
TOP OF THE WHIPSTOCK AT 6007' MD
CLEAN OUT WHIP STOCK RETRIEVAL SLOT
WITH 350 GPM, 1350 PSI
ORIENT HOOK
ENGAGE WHIPSTOCK, SHEAR ANCHOR AND
UNSEAT WHIPSTOCK WITH 75 KLBS
OVERPULL
0400 04:30 0.50 CASING P 13,022 00
PROD4 CIRCULATE BOTTOMS UP
350 GPM, 1350 PSI
DROP 2-3/8" DRIFT
MONITOR WELL FOR 10 MIN (STATIC)
04:30 11 00 6.50 CASING P 13,022.00
PROD4 PULL OUT OF THE HOLE WITH WHIPSTOCK
FROM 6007' MD TO SURFACE
- LAY DOWN WHIPSTOCKAND RETRIEVAL
ASSEMBLY
- NOTE DIRECTION WHIPSTOCK CAME OUT
OF THE HOLE
11:00 12:00 1.00 CASING P 13,022.00
PROD4 RIG UP TO RUN 4-1/2" SLOTTED LINER
- DOUBLE STACK TONGS, AIR SLIPS AND
ELEVATORS
Printed 12/17/2019 11.21.21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 48 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-D1-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth
Phase
I Description of Operations
(hr)
(usft)
_ _
12:00 - 21:30 9-50
CASING P 13,022.00
PROD4
RUN 4.5'; 12.6#, L-80 SLOTTED LINER TO
TOTAL LENGTH OF 6960 ' MD
USE BEST 0 LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
ORIENT BENT JOINT TO THE DIRECTION
THE WHIPSTOCK CAME OUT OF THE HOLE,
NO ISSUES ENTERING LATERAL WITH BENT
JOINT
MAKE UP HOOK HANGER ASSEMBLY WITH
INNER STRING AND SLIMHOLE MWD
21:30 00:00 2.50
CASING P 13,022.00
PROD4
CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 6960' MD TO
11808' MD
- RIH AT 90 FPM PER BAKER REP
11/9/2019 00 00 00.30 0.50
CASING P 13,022.00
PROD4
CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 11 808'MD
TO PLANNED SET DEPTH AT 12961' MD
RI HAT 90 FPM PER BAKER REP
FINAL PU 140 KLBS, SO 75 KLBS
0030 0400 3.50
CASING P 13,022.00
PROD4
SET HOOK HANGER AND RELEASE
ORIENT HOOK HANGER TO 22° LOHS
120 GPM, 650 PSI
TAG BOTTOM OF WINDOW WITH HOOK
HANGER ON DEPTH, SET DOWN 15 KLBS
-PICKUP AND ORIENT 158° ROHS, RIH PAST
BOTTOM OF WINDOW WITH HOOK HANGER
-3'
- PICK UP AND ORIENT 22° LOHS, RIH AND
LAND HOOK HANGER ON BOTTOM OF
WINDOW, SET DOWN 15 KLBS
BREAK OUT OF STRING AND DROP BALL
PUMP BALL DOWN AND PRESSURE UP TO
3300 PSI, BLEED PRESSURE AND PICK UP TO
RELEASE FROM HANGER
PU WEIGHT REDUCED 20 KLBS AFTER
RELEASING FROM LINER
PRESSURE UP TO 4300 PSI TO SHEAR OUT
BALL SEAT
- TOP OF LINER AT 6001' MD, SHOE AT 12961'
MD
0400 0800 4.00
CASING P 13,022.00
PROD4
PULL OUT OF THE HOLE FROM THE LINER
TOP AT 6001' MD AND LAY DOWN LINER
RUNNING TOOLAND MWD
08:00 10:00 2.00
CASING P 13,022.00
PROD4
MAKEUP LEM ASSEMBLY TO TOTAL LENGTH
_ __
OF 220' MD
10:00 14:00 4.00
1 CASING P 13,022.00
PROD4
RUN IN THE HOLE WITH LEM ASSEMBLY ON
4" DP FROM 220' MD TO SET DEPTH AT 6108'
MD
SHALLOW HOLE TEST MWD AT 310' MD
ORIENT LEM PRIOR TO ENTERING HOOK
HANGER
LEM SEALASSEMBLY 16' INSIDE SEALBORE
EXTENSION ON LINER #3
14 00 16:00 2.00
CASING P 13,022.00
PROD4
DROP BALL, SET AND RELEASE FROM LINER
HANGER
SET LINER TOP PACKER
LINER TOP AT 5902' MD
Printed 12/17/2019 11:21:21AM
"All depths reported in Drillers Depths"
North America - ALASKA - BP Page 49 of 55
Operation Summary Report
Common Well Name: 5-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
16:00 20:00 4.00
CASING P
13,022.00
PROD4
PULL OUT OF THE HOLE FROM 5902' MD TO
SURFACE
LAY DOWN RUNNING TOOLS AND MWD
20:00 22:30 2.50
CASING P
13,022.00
PROD4
MAKE UP WHIPSTOCKAND MILLASSEMBLY
TO 428' MD
22:30 00:00 1.50
CASING P
13,022.00
PROD4
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
428'MDTO3171'MD
FILL PIPE EVERY 2000' MD
SHALLOW HOLE TEST TOOLS AT 900' MD:
275 GPM, 950 PSI
- MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
11/10/2019 00:00 01:30 1.50
CASING P
13,022.00
PROD4
RUN IN THE HOLE ON ELEVATORS WITH
WHIPSTOCKAND MILLING ASSEMBLY FROM
3171' MD TO 5901' MD
FILL PIPE EVERY 2000' MD
MONITOR WELL WITH HOLE FILLAND TRIP
TANK WHILE RUNNING IN: GOOD
DISPLACEMENT
MUD WEIGHT IN/OUT = 9.1 PPG
01:30 02:30 1.00
CASING P
13,022.00
PROD4
ORIENT AND SET BAKER WHIPSTOCK PER
BAKER FISHING REP
ORIENT WHIPSTOCK TO 343° (17°LOHS)
WASH DOWN 250 GPM AND TAG TOP OF
LINER
SET WHIPSTOCK PER BAKER FISHING REP:
SET DOWN 10 KLBS TO SHEAR ANCHOR
PICK UP 10 KLBS OVER TO VERIFY ANCHOR
SET
- SLACK OFF AND OBSERVE MILLS SHEAR
FROM SLIDE WITH 37 KLBS
TOW 5849' MD
BOW 5862' MD
02:30 15:00 12.50
DRILL P
5,884.00
PROD1
MILL WINDOW PER BAKER FISHING REP
FROM 5849' MD TO 5862' MD, DRILL NEW
FORMATION TO 5884' MD
325 GPM, 1650 PSI
100 RPM, 2-7 KFT-LBS TORQUE
PU 114 KLBS, SO 99 KLBS, ROT 102 KLBS
MUD WEIGHT IN/OUT = 9.1 PPG
REAM WINDOW 3X TO ESURE SMOOTH
OPENING, DRIFT WINDOW WITH NO PUMPS
OR ROTATION WITH NO ISSUES
- CIRCULATE 35 BBL HIGH VIS SWEEP
SURFACE TO SURFACE, NO INCREASE IN
CUTTINGS OR METAL SHAVINGS BACK AT
SHAKERS
15:00 17:00 2.00
DRILL P
5,884.00
PROD1
PULL OUT OF THE HOLE FROM 5884' MD TO
THE TOP OF THE BHAAT 372' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM AND AT THE TOP OF
THE BHA (STATIC)
1700 1800 1.00
DRILL P
5,884.00
PROD1
LAY DOWN MILLING BHA FROM 372' MD TO
SURFACE
- MILLS GAUGE = PILOT MILL 3/16" OUT,
UPPER DRESS MILL IN GAUGE
**All depths reported in Drillers Depths**
Common Well Name: S-202
Event Type: DRL- ONSHORE (DON)
North America - ALASKA - BP Page 50 of 55
Operation Summary Report
Start Date: 9/22/2019 End Date: 11/15/2019
AFE No
H-S4DWO019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date
From - To
Hrs
Task
Code
NPT Total Depth
Phase
Description of Operations
DRILL
- -
14:00
(hr)
_
1.50
DRILL
(usft)
5 KLBS WOB
18:00 18:30
050
DRILL
P
5,884.00
PROD1
CLEAN AND CLEAR RIG FLOOR
r
—
P
6,230.00
_
FLUSH BOP STACK
18:30 20:00
1.50
DRILL
P
5,884.00
PROD1
MAKE UP 6-3/4" MOTOR BHA TO TOTAL
50 RPM, 5 KFT-LBS ON BOTTOM, 3 KFT-LBS
OFF BOTTOM, UP TO 15 KLBS WOB
LENGTH OF 174' MD
PU 120 KLBS, SO 90 KLBS, ROT 100 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
6-1/8" TRICONE BIT, MUD MOTOR WITH 1.5°
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
P
6,230.00
AKO, AND M_WD
20:00 23:00
3.00
DRILL
P
5,884.00
PROD1
RUN IN THE HOLE ON 4" DP FROM 174' MD TO
BOTTOM AT 5884' MD
23:00
00:00
1.00
DRILL
11/11/2019 00:00
09:30
9.50
DRILL
09:30 - 10:30 1.00 DRILL
10:30
1300
2.50
DRILL
13:00
14:00
1.00
DRILL
- -
14:00
1530
_
1.50
DRILL
15:30 - 20:30 5.00 DRILL
NOBLE
20:30 21:00 0.50 DRILL P 6,230.00 PROD1 RIG DOWN AND BLOW DOWN TESTING
EQUIPMENT
- PULL TEST PLUG AND INSTALL WEAR
BUSHING (7" ID)
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
SHALLOW TEST THE MWD AT 1100' MD
ORIENT MOTOR TO 17° LOHS PRIOR TO
ENTERING WINDOW, NO ISSUES TRIPPING
THROUGH WINDOW
P 5,897.00
PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
BUILD SECTION FROM 5884' MD TO 5897' MD
275 GPM, 1200 PSI ON/OFF BOTTOM
5 KLBS WOB
PU 113 KLBS, SO 92 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
r
—
P
6,230.00
PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
BUILD SECTION FROM 5897' MD TO 6230' MD
275 GPM, 1375 PSI ON/OFF BOTTOM
50 RPM, 5 KFT-LBS ON BOTTOM, 3 KFT-LBS
OFF BOTTOM, UP TO 15 KLBS WOB
PU 120 KLBS, SO 90 KLBS, ROT 100 KLBS
SURVEY EVERY 30', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
P
6,230.00
PROD1 CIRCULATE BOTTOMS UP
300 GPM, 1360 PSI
50 RPM, 4 KFT-LBS TORQUE
MONITOR WELL FOR 10 MIN (STATIC)_
P 6,230.00
PROD1 PULL OUT OF THE HOLE FROM 6230' MD TO
THE TOP OF THE BHAAT 174' MD
- MONITOR WELL FOR 10 MIN AT THE TOP OF
THE BHA (STATIC)
P 6,23000
PROD1 LAY DOWN BHA FROM 174' MD TO SURFACE
- BIT GRADE: 1 -1 -IN GAUGE
P 6,230.00
PROD1 CLEAN AND CLEAR RIG FLOOR AND
PREPARE TO TEST BOPE
MAKE UP TEST JOINTS
DRAIN STACK
PULL WEAR BUSHING SET TEST PLUG
FILL STACK WITH WATERAND BLEED AIR
FROM SYSTEM
P 6,23000
PROD1 PRESSURE TEST BOPE TO 250 PSI LOW AND
3500 PSI HIGH FOR 5 MIN EACH
- TEST WITH 4" AND 4-1/2" TEST JOINTS
NO FAILURES
TEST WITNESSED BY AOGCC REP BOB
NOBLE
20:30 21:00 0.50 DRILL P 6,230.00 PROD1 RIG DOWN AND BLOW DOWN TESTING
EQUIPMENT
- PULL TEST PLUG AND INSTALL WEAR
BUSHING (7" ID)
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 51 of 55
Operation Summary Report
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:00PM
i Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
— (hr)
(usft)
21:00 - 23:00 2.00
DRILL P
6,230.00 PROD1
I PICK UPAND MAKE UP BHA#12, 6-3/4" PROD5
2300 - 00:00
11/12/2019 00.00 - 02:00
DRILLING ASSEMBLY PER BAKER DD /MWD
TO TOTAL LENGTH OF 158' MD
- SMITH X516 PDC BIT, AUTOTRAK EXACT,
MWD/LWD
PLUG IN AND VERIFY COMMUNICATION
LOAD SOURCES
PU 42 KLBS, SO 43 KLBS AT 153' MD
1.00 DRILL P 6,230.00 PROD1 RUN IN THE HOLE WITH ROTARY STEERABLE
ASSEMBLY FROM 158' MD TO 1100' MD
SHALLOW TEST THE MWD AT 1100' MD, 300
GPM, 850 PSI
2.00 DRILL P 61230.00 PROD1 TRIP IN THE HOLE ON ELEVATORS FROM
I1100' MD TO 5869' MD
1 NO ISSUES TRIPPING THROUGH WINDOW
02:00 - 06 00 4.00 DRILL P 6,230.00 PROD1 MADD PASS FROM 5869' MD TO BOTTOM AT
6230' MD
' i - 300 GPM, 1200 PSI
_ OBTAIN 3 VERIFICATION SURVEYS
06:00 - 12:0]0 6.00 DRILL P 6,750.00 PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 6230' MD TO 6750' MD
520 FT IN 6 HRS: 87 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1450 PSI ON/OFF BOTTOM
120 RPM, 6 KFT-LBS TORQUE ON, 5 KFT-LBS
TORQUE OFF, UP TO 5 KLBS WOB
PU 133 KLBS, SO 84 KLBS, ROT 102 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 300
UNITS, MAX AT 1250 UNITS
12 00 0000 12.00 DRILL P 7,740.00 PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 6750' MD TO 7740' MD
990 FT IN 12 HRS: 83 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1550 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 142 KLBS, SO 80 KLBS, ROT 100 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 150
UNITS, MAX AT 828 UNITS
Printed 12/17/2019 11 21.21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 52 of 55
Common Well Name: S-202 AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date 11/15/2019 H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
– – -- -- – —
ProjectPW Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
11/13/2019 00:00 12:00 12.00 DRILL P 8,778.00 PROD1 DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 7740' MD TO 8778' MD
- 1038 FT IN 12 HRS: 86.5 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1630 PSI ON/OFF BOTTOM
120 RPM, 8 KFT-LBS TORQUE ON, 7 KFT-LBS
TORQUE OFF, UP TO 10 KLBS WOB
PU 147 KLBS, SO 81 KLBS, ROT 101 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2440 UNITS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 7743' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8014' MD, 75% INCREASE IN
CUTTINGS BACK AT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8300' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8585' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
12.00 00:00 12.00 DRILL P 9,622.00 PROD1 DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 8778' MD TO 9622' MD
844 FT IN 12 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1720 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 167 KLBS, SO 78 KLBS, ROT 107 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 350
UNITS, MAX AT 1060 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 8870' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9134' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
- PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9419' MD, 75% INCREASE IN
CUTTINGS BACKAT SHAKERS
Printed 12/17/2019 11:21:21AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
Page 53 of 55
AFE No
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
"'All depths reported in Drillers Depths—
ProjectPBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
+00:00
--- - -
11/14/2019 12:00 12.00 DRILL P 10,462.00
PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 9622' MD TO 10462' MD
- 840 FT IN 12 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1800 PSI ON/OFF BOTTOM
120 RPM, 10 KFT-LBS TORQUE ON, 9
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 170 KLBS, SO 65 KLBS, ROT 106 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2259 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9705' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 9996' MD, 25% INCREASE IN
CUTTINGS BACKAT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10279' MD, 25% INCREASE IN
CUTTINGS BACK AT SHAKERS
'12:00 00:00
12.00 DRILL P 11,402.00
PROD1 DIRECTIONALLY DRILL 6-3/4" PROD5 LATERAL
SECTION FROM 10462' MD TO 11 402'MD
940 FT IN 12 HRS: 78 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1900 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 54 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 500
UNITS, MAX AT 2000 UNITS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10559' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 10843' MD, 50% INCREASE IN
CUTTINGS BACK AT SHAKERS
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP AT 111255' MD, 50% INCREASE IN
CUTTINGS BACKAT SHAKERS
"'All depths reported in Drillers Depths—
North America - ALASKA - BP
Operation Summary Report
Page 54 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON) Start Date: 9/22/2019 End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00 )
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Daterrime: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
11/15/2019 00:00 01:30 1.50 DRILL P 11,506.00 PROD1
DIRECTIONALLY DRILL 6-3/4" PRODS LATERAL
SECTION FROM 11 402'MD TO 11 506'MD
104 FT IN 1.5 HRS: 70 FT/HR ROP WITH
CONNECTIONS
320 GPM, 1950 PSI ON/OFF BOTTOM
120 RPM, 11 KFT-LBS TORQUE ON, 10
KFT-LBS TORQUE OFF, UP TO 10 KLBS WOB
PU 182 KLBS, SO 54 KLBS, ROT 104 KLBS
SURVEY EVERY 90', NO BACK REAMING AT
CONNECTIONS
MUD WEIGHT IN/OUT = 9.1 PPG
GASWATCH BACKGROUND RANGE = 400
UNITS, MAX AT 700 UNITS
- TD WAS CALLED EARLY DUE TO
ENCOUNTERING AN UNEXPECTED FAULT AT
10926' MD AND ENCOUNTERED LOW
i RESISTIVITY, ATTEMPTED TO DECREASE
INCLINATION TO FIND TARGET SAND WITH
_
NO SUCCESS
01:30 03:30 2.00 DRILL P 11,506.00 PROD1
CIRCULATE HOLE CLEAN WITH 2X BOTTOMS
UP
350 GPM, 2250 PSI
140 RPM, 11 KFT-LBS TORQUE
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP, 50% INCREASE IN CUTTINGS BACK
AT SHAKERS
- MONITOR THE WELL FOR 10 MIN (STATIC)
0330 1000 6 50 DRILL P 11,506.00 PROD1
PULL OUT OF THE HOLE FOR PLANNED
SHORT TRIP FROM 11506' MD TO 7-5/8"
WINDOW AT 5849' MD
OBSERVE 20-30 KLBS DRAG AT 11 005'MD
BACKREAM FROM 11005' MD TO 10460' MD,
320 GPM, 120 RPM, 1000 FPM
- OBSERVE OVERPULL WITH THE BHA
STABILIZERS ACROSS THE WINDOW,
ATTEMPT TO WORK STABILIZERS THROUGH
WINDOW WITHOUT ROTATION WITH NO
SUCCESS, PUMP AND ROTATE TO PULL
STABILIZERS INTO WINDOW, ATTEMPT TO
DRESS WINDOW WITH STABILIZERS WITH
320 GPM, 40-60 RPM
- MONITOR THE WELL FOR 10 MIN AT THE
WINDOW (STATIC)
10:00 13:00 3.00 DRILL P 11,506.00 PROD1
RUN IN THE HOLE ON ELEVATORS FROM
5849' MD TO BOTTOM AT 11506' MD
NO ISSUES RUNNING THROUGH OPEN
HOLE
13:00 15:30 250 DRILL P 11,506.00 PROD1
CIRCULATE HOLE CLEAN ON BOTTOM
320 GPM, 1920 PSI
120 RPM, 10 KFT-LBS TORQUE
PUMP 70 BBL TANDEM LOW VIS / HIGH VIS
SWEEP, 25% INCREASE IN CUTTINGS BACK
AT SHAKERS
SPOT 290 BBL 4% LUBE SWEEP ON
BOTTOM
MONITOR WELL FOR 10 MIN (STATIC)
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 55 of 55
Common Well Name: S-202
AFE No
Event Type: DRL- ONSHORE (DON)
Start Date: 9/22/2019
End Date: 11/15/2019
H-S4DW0019CM-EX-DI-DN- (16,199,881.00)
Project: PBU
Site: S
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
15:30 20:30
5.00
DRILL P
11,506.00 PROD1
PULLOUT OF THE HOLE FROM BOTTOM AT
11506' MD TO THE TOP OF THE BHAAT 156'
MD
- MONITOR WELL FOR 10 MIN AT THE
WINDOW AND THE TOP OF THE BHA (STATIC)
- NO ISSUES PULLING THROUGH OPEN
HOLE, OBSERVED 10-20 KLBS OVERPULL
WITH BHA STABILIZERS ACROSS WINDOW
20:30 22:00
1.50
DRILL P
11,506.00 PROD1
LAY DOWN BHA FROM 156' MD TO SURFACE
- BIT GRADE: 1 -1 -IN GAUGE
"'END DON EVENT AT 22:00, SEE CON
EVENT***
Printed 12/17/2019 11:21:21AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 1 of 4
Common Well Name: S-202 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 11/15/2019 End Date: 11/19/2019 H-S4DW0019CM-EX-DI-DN- (8,102,923.00)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM Rig Release: 11/19/2019
Rig Contractor PARKER DRILLING CO. j BPUOI:
Active datum. PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) ---- (usft) - --
11/15/2019 22:00 22:30 0.50 CASING P 11,506.00 I RUNPRD CLEAN AND CLEAR RIG FLOOR
HOIST MILLING ASSEMBLY TO RIG FLOOR
22:30 00:00 1.50 CASING P 11,506.00 RUNPRD MAKEUP WINDOW MILLING BHA WITH JUNK
BASKET_ S TO TOTAL LENGTH OF 61' MD
11/16/2019 00:00 02:30 2.50 CASING P 11,506.00 RUNPRD RUN IN THE HOLE WITH WINDOW MILLING
ASSEMBLY ON 4" DP TO 5880' MD
DRIFT WINDOW WITH MILLS UNTIL UPPER
MILL 3' OUTSIDE WINDOW WITH NO ISSUES
MONITOR WELL FOR 10 MIN (STATIC)
02:30 - 05:00 2.50 CASING P 11,506.00 RUNPRD PULL OUT OF THE HOLE FROM 5865' MD TO
THE TOP OF THE BHAAT 61' MD
- - - -I 05:00
06:00
NO ISSUES PULLING MILLS THROUGH
WINDOW
- 06:00 1.00 CASING P 11,506.00 RUNPRD LAY DOWN MILLING ASSEMBLY FROM 61' TO
06:30 0.50
06:30 - 09:30—T 3.00
09:30 - 10:30 1.00
10:30 - 15.30 5.00
15 30 16:30 1.00
1630 0000 7.50
SURFACE
CASING P 11,506.00 RUNPRD MAKE UP WHIPSTOCK RETRIEVAL ASSEMBLY
WITH BAKER MWD TO 98' MD
CASING P 11,506.00 RUNPRD RUN IN THE HOLE WITH THE WHIPSTOCK
RETRIEVAL ASSEMBLY ON 4" DP FROM 98' MD
TO 5849' MD
SHALOW TEST THE MWD AT 2200' MD
CLEAN OUT WHIP STOCK RETRIEVAL SLOT
WITH 350 GPM, 1350 PSI
ORIENT HOOK
ENGAGE WHIPSTOCK, SHEAR ANCHOR AND
UNSEAT WHIPSTOCK WITH 100 KLBS
OVERPULL
CASING P 11,506.00 RUNPRD CIRCULATE BOTTOMS UP
350 GPM, 1350 PSI
DROP 2-3/8" DRIFT
_ - MONITOR WELL FOR 10 MIN (STATIC)
CASING P 11,506.00 RUNPRD PULL OUT OF THE HOLE WITH WHIPSTOCK
FROM 5849' MD TO SURFACE
- LAY DOWN WHIPSTOCKAND RETRIEVAL
ASSEMBLY, NO ABNORMAL MARKINGS ON
WHIPSTOCK
NOTE DIRECTION WHIPSTOCK CAME OUT
OF THE HOLE
CASING P 11,506.00 RUNPRD RIG UP TO RUN 4-1/2" SLOTTED LINER
DOUBLE STACK TONGS, AIR SLIPS AND
ELEVATORS
CASING P 11,506.00 RUNPRD RUN 4.5", 12.6#, L-80 SLOTTED LINER TO
TOTAL LENGTH OF 5619 ' MD
USE BEST O LIFE PIPE DOPE
TORQUE CONNECTIONS TO 6150 FT -LBS
RUN 1 FLOATING CENTRALIZER ON EVERY
OTHER JOINT
- ORIENT BENT JOINT TO THE DIRECTION
THE WHIPSTOCK CAME OUT OF THE HOLE,
NO ISSUES ENTERING LATERAL WITH BENT
JOINT
MAKE UP HOOK HANGER ASSEMBLY WITH
IN STRING AND SLIMHOLE MWD
SHALLOW TEST THE MWD AT 5619' MD
LINER WEIGHT PU 101 KLBS, SO 79 KLBS
Printed 12/17/2019 11:22 22AM `*All depths reported in Drillers Depths""
North America - ALASKA - BP
Operation Summary Report
Page 2 of 4
Common Well Name: S-202
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 11/15/2019 End Date: 11/19/2019 H-S4DW0019CM-EX-DI-DN- (8,102,923.00)
Project: PBU
Site: S
I
Rig Name/No.: PARKER 272
Spud Date/Time: 9/30/2019 11:00:OOPM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO.
BPUOI:
Active datum: PLAN KB P272 @85.05usft (above
Mean Sea Level)
Date From - To Hrs
(hr)
Task Code NPT Total Depth
(usft)
Phase
Description of Operations
11/17/2019 00:00 03:00 3.00
CASING P 11,506.00
RUNPRD
CONTINUE IN THE HOLE WITH 4-1/2"
SLOTTED LINER ON 4" DP FROM 5619' MD TO
PLANNED SET DEPTH AT 11461' MD
RIH AT 90 FPM PER BAKER REP
NO ISSUES RUNNING THROUGH OPEN
HOLE
- —
FINAL
— PU 140 KLBS,-SO 75 KLBS
-- —-
03:00 05:00 2.00
CASING P 11,506.00
RUNPRD
SET HOOK HANGER AND RELEASE
ORIENT HOOK HANGER TO 17° LOHS
- 120 GPM, 600 PSI
TAG BOTTOM OF WINDOW WITH HOOK
!
HANGER ON DEPTH, SET DOWN 20 KLBS
PICK UP AND ORIENT 163° ROHS, RIH PAST
BOTTOM OF WINDOW WITH HOOK HANGER
-3'
- PICK UP AND ORIENT 17° LOHS, RIH AND
LAND HOOK HANGER ON BOTTOM OF
WINDOW, SET DOWN 20 KLBS
BREAK OUT OF STRING AND DROP BALL
PUMP BALL DOWN AND PRESSURE UP TO
3700 PSI, BLEED PRESSURE AND PICK UP TO
RELEASE FROM HANGER
PU WEIGHT REDUCED 25 KLBS AFTER
RELEASING FROM LINER
PRESSURE UP TO 4150 PSI TO SHEAR OUT
BALL SEAT -- -
-TOP OF LINER AT 5843' MD, SHOE AT 11461'
MD
05:00 08:30 3.50 CASING P 11,506.00 RUNPRD PULL OUT OF THE HOLE FROM THE LINER
TOP AT 5843' MD AND LAY DOWN LINER
RUNNING TOOL AND MWD
_ _ __ - NO ISSUES WITH LINER RUNNING TOOL
08:30 11:30 3.00 CASING P 11,506.00 RUNPRD MAKE UP LEM ASSEMBLY AND INNER STRING
WITH SLIMHOLE MWD TO TOTAL LENGTH OF
192' MD
11:30 15:30 4.00 CASING P 11,506.00 RUNPRD RUN IN THE HOLE WITH LEM ASSEMBLY ON
4" DP FROM 220' MD TO SET DEPTH AT 5935'
MD
SHALLOW HOLE TEST MWD AT 250' MD
ORIENT LEM PRIOR TO ENTERING HOOK
HANGER
LEM SEAL ASSEMBLY 14' INSIDE SEALBORE
EXTENSION ON LINER #4
Printed 12/17/2019 11:22:22AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 3 of 4
Operation Summary Report
Common Well Name: S-202 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 11/15/2019 End Date: 11/19/2019 H-S4DW0019CM-EX-D1-DN- (8,102,92100)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:OOPM Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth ! Phase Description of Operations
15:30 - 21:30 6.00 CASING P 11,506.00 RUNPRD SET AND RELEASE FROM LINER HANGER
CONFIRM STABBED IN HOOK HANGER
ASSEMBLY
21:30 22:30 1.00
22:30 00:00 1.50
11/18/2019 00:00 01:30 1.50
DROP BALLAND PUMP DOWN TO BALL
SEAT
PRESSURE UP TO 2500 PSI, OBSERVE
INDICATION OF PUSHER TOOLACTIVATING
AND SETTING PACKER
- ATTEMPT TO INCREASE PRESSURE TO 4100
PSI TO ACTIVATE RELEASE MECHANISM,
BURT DISK PREMATURELY BURSTAT 3980
PSI
UNABLE TO RELEASE FROM LINER,
PERFORM LEFT HAND RELEASE
PROCEDURE TO RELEASE FROM LINER
-AFTER RELEASING FROM LINER AND PRIOR
TO PULLING OUT OF PACKOFF, PERFORM 5
MIN ASSURANCE TEST ON LTP TO 3500 PSI
(GOOD TEST)
LINER TOP AT 5743' MD
CASING P 11,506.00 RUNPRD PULL 2 STANDS TO 5566' MD
CASING P
F CASING P
t
19:30 - 21:30 2.00 RUNCOM I P
CUTAND SLIP DRILL LINE
RECALIBRATE BLOCK HEIGHT
11,506.00 RUNPRD "PULL OUT OF THE HOLE FROM 5566' MD TO
2500' MD
MONITOR WELL FOR 10 MIN (STATIC)
11,506.00 RUNPRD PULL OUT OF THE HOLE FROM 5566' MD TO
2500' MD
LAY DOWN RUNNING TOOLS AND MWD
NO ISSUES WITH RUNNING TOOL
PERFORM WEEKLY BOPE FUNCTION TEST
11,506.00 RUNCMP CLEAN AND CLEAR RIG FLOOR
11,506.00 RUNPRD RIG UP TO RUN TUBING
DOUBLE STACK TONGS WITH TORQUE
TURN
-AIR SLIPS, CASING ELEVATORS
SLB I -WIRE SPOOL
11,506.00 RUNPRD RUN 4-1/2", 12.6#, 13CR-85, COMPLETION
TUBING TO TOTAL LENGTH OF 5752' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 4440
FT -LBS
RIH AT 90 FPM PER HES
MUD WEIGHT IN/OUT 9.1 PPG
FINAL PU 100 KLBS, SO 80 KLBS
PARKER 272 BLOCK WEIGHT 35 KLBS
SPACE OUT AND TERMINATE I -WIRE
LAND TUBING AND RUN IN LOCK DOWN
SCREWS —
11,506.00 RUNPRD DISPLACE WELL TO 9.8 PPG BRINE
4 BPM, 300 PSI
SPOT INHIBITED 9.8 PPG BRINE FROM
SURFACE TO WLEG
OVER DISPLACE BY 5 BBL, PUMP 5 BBL
DOWN TUBING TO WASH OFF RHC PLUG
Printed 12/17/2019 11:22.22AM **All depths reported in Drillers Depths**
I
t i -
01:30 02:00 0.50
RUNCOM P
02:00 04:00 2.00
RUNCOM P
04:00 19:30 15.50
RUNCOM P
t
19:30 - 21:30 2.00 RUNCOM I P
CUTAND SLIP DRILL LINE
RECALIBRATE BLOCK HEIGHT
11,506.00 RUNPRD "PULL OUT OF THE HOLE FROM 5566' MD TO
2500' MD
MONITOR WELL FOR 10 MIN (STATIC)
11,506.00 RUNPRD PULL OUT OF THE HOLE FROM 5566' MD TO
2500' MD
LAY DOWN RUNNING TOOLS AND MWD
NO ISSUES WITH RUNNING TOOL
PERFORM WEEKLY BOPE FUNCTION TEST
11,506.00 RUNCMP CLEAN AND CLEAR RIG FLOOR
11,506.00 RUNPRD RIG UP TO RUN TUBING
DOUBLE STACK TONGS WITH TORQUE
TURN
-AIR SLIPS, CASING ELEVATORS
SLB I -WIRE SPOOL
11,506.00 RUNPRD RUN 4-1/2", 12.6#, 13CR-85, COMPLETION
TUBING TO TOTAL LENGTH OF 5752' MD
USE JET LUBE SEAL GUARD PIPE DOPE
TORQUE TURN CONNECTIONS TO 4440
FT -LBS
RIH AT 90 FPM PER HES
MUD WEIGHT IN/OUT 9.1 PPG
FINAL PU 100 KLBS, SO 80 KLBS
PARKER 272 BLOCK WEIGHT 35 KLBS
SPACE OUT AND TERMINATE I -WIRE
LAND TUBING AND RUN IN LOCK DOWN
SCREWS —
11,506.00 RUNPRD DISPLACE WELL TO 9.8 PPG BRINE
4 BPM, 300 PSI
SPOT INHIBITED 9.8 PPG BRINE FROM
SURFACE TO WLEG
OVER DISPLACE BY 5 BBL, PUMP 5 BBL
DOWN TUBING TO WASH OFF RHC PLUG
Printed 12/17/2019 11:22.22AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 4 of 4
Operation Summary Report
Common Well Name. S-202
Event Type: COM- ONSHORE (CON) Start Date: 11/15/2019
AFE No
End Date: 11/19/2019 H-S4DW0019CM-EX-DI-DN- (8,102,92100)
Project: PBU Site: S
Rig Name/No.: PARKER 272 Spud Date/Time: 9/30/2019 11:00:00PM
Rig Release: 11/19/2019
Rig Contractor: PARKER DRILLING CO. BPUOI:
Active datum: PLAN KB P272 @85.05usft (above Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth
! Phase
Description of Operations
(hr) (usft)
21:30 - 23:00
1.50 RUNCOM P 11,506.00
RUNPRD
PRESSURE TEST TUBING AND IA
- PRESSURE TEST TUBING TO 3500 PSI FOR
30 MIN (GOOD TEST)
— OBSERVE PRODUCTION PACKER SET AT
2050 PSI
- BLEED TUBING TO 2000 PSI
HOLD PRESSURE ON TUBING AND
PRESSURE TEST IA TO 3500 PSI FOR 30 MIN
(GOOD TEST)
TESTS APPROVED BY WSUP
2300
BLEED PRESSURE FROM TUBING TO
SHEAR OUT VALVE IN GLM#3
- PUMP BOTH 5 BBL EACH WAY TO CONFIRM
SHEAR, 2 BPM, 800-900 PSI
RUNCOM P 11,506.00 RUNPRD MONITOR WELL FOR 1 HR PRIOR TO
INSTALLING TWC
11/19/2019 00:00 01:30 1.50 RUNCOM P
i
01 30 06:00 4.50 RUNCOM P
i
06 00 14:00 8.00 RUNCOM P
BUILD DRY ROD FOR INSTALLING TWC
RIG UP TO DRAIN STACK
SUCK OUTFLOW BOX
11,506.00 RUNPRD FMC ON LOCATION TO INSTALL TWC
DRAIN BOPE STACK
INSTALL TWC
PRESSURE TEST TWC FROM BELOW TO
3500 PSI FOR 5 MIN (GOOD TEST)
11,506.00 RUNPRD NIPPLE DOWN BOP STACKAND HIGH
PRESSURE RISERS
PULL FLOW RISER
RIG DOWN FLOW LINE, TURN BUCKLES AND
FILL UP LINE
BREAK BOLTS ON BOP STACKAND STAND
BACK
- BREAK BOLTS ON RISERS, PULL AND LAY
DOWN
11,506.00 RUNPRD NIPPLE UP TREE
-TEST ADAPTER VOID TO 4500 PSI FOR 15
MIN (GOOD TEST)
TEST TREE TO 4500 PSI (VISUAL LEAK
TIGHT)
SUCK OUT TREE
TERMINATE I WIRE
SIMOPS:
GENERAL RIG DOWN OPERATIONS
***RIG RELEASED AT 14:00***
Printed 12/17/2019 11:22:22AM **All depths reported in Drillers Depths**
Obp
North America - ALASKA - BP
PBU
S
S-202
S -202L4
500292364763
Design: S -202L4
Final Survey Report
18 November, 2019
Baker
Hughes
a►�a
Well S-202
2ibp
ACTUAL KB P272 @ 84.80usft
000%
ACTUAL KB P272 @ 84.80usft
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
S-2021-4
Design:
S-2021-4
BP
Final Survey Report
Local Coordinate Reference:
Well S-202
TVD Reference:
ACTUAL KB P272 @ 84.80usft
MD Reference:
ACTUAL KB P272 @ 84.80usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point
Map Zone: NAD27 OGP-UsaAK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site S, TR -12-12
Site Position:
From: Map
Position Uncertainty: 0.00 usft
well S-202
Well Position +N/ -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore S-2021-4
Magnetics Model Name Sample Date
BG G M2018 11/1/2020
Design S-2021-4
Baker
Hughes
Northing:
5,980,854.540 usft
Latitude:
70° 21'23.002 N
Easting:
617,919.920 usft
Longitude:
149° 2'32.343 W
Slot Radius:
0.000 in
Grid Convergence:
0.90 °
Northing:
5,979,262.560 usft
Latitude:
70° 21'7.196 N
Easting:
618,885.120 usft
Longitude:
1490 2'4.867 W
Wellhead Elevation:
37.90 usft
Ground Level:
. _.__....... .
37.90 usft
Declination
Dip Angle Field Strength
(°)
(°)
(nT)
15.99
80.87
57,369.30191702
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth: 5,790.51
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W Direction
(usft)
(usft)
(usft) (I
46.90
0.00
0.00 330.03
11/18/2019 3:37,16PM
Page 2 COMPASS 5000.15 Build 90
e+'BP
s 1 by Final Survey Report Baker
0N Hughes
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S-2021-4
Survey Calculation Method:
Minimum Curvature
Design: S-2021-4
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program
Date 11/18/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
98.76
1,457.62 Survey #1 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
1,515.57
3,039.76 Survey #2 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
3,078.60
3,078.60 Survey #3 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
3,172.96
5,790.51 Survey #4 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
5,849.00
6,016.70 Survey #1 (S-2021-4)
INC+TREND
Inclinometer+ known azi trend
6,050.58
6,174.60 Survey #2 (S-2021-4)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
6,242.39
11,506.00 Survey #3 (S-2021-4)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
Survey
MD
Inc Azi
TVD
TVDSS
N/S E/W
Northing
Easting DLeg
V. Sec
(usft)
(°) (°)
(usft)
(usft)
(usft) (usft)
(usft)
(usft) (°/100usf1t)
(usft)
46.90
0.00 0.00
46.90
-37.90
0.00 0.00
5,979,262.560
618,885.120
0.00
0.00
98.76
0.09 159.26
98.76
13.96
-0.04 0.01
5,979,262.522
618,885.135
0.17
-0.04
192.78
0.00 41.48
192.78
107.98
-0.11 0.04
5,979,262.454
618,885.162
0.10
-0.11
249.87
0.18 63.63
249.87
165.07
-0.07 0.12
5,979,262.495
618,885.242
0.32
-0.12
340.74
0.26 298.83
340.74
255.94
0.10 0.07
5,979,262.657
618,885.187
0.43
0.05
433.08
0.18 340.31
433.08
348.28
0.33 -0.16
5,979,262.890
618,884.951
0.19
0.37
525.71
0.26 337.50
525.71
440.91
0.66 -0.29
5,979,263.219
618,884.816
0.09
0.72
617.86
0.18 309.73
617.86
533.06
0.95 -0.49
5,979,263.502
618,884.620
0.14
1.07
710.75
0.79 125.86
710.75
625.95
0.67 -0.08
5,979,263.227
618,885.031
1.04
0.62
802.03
2.61 115.66
801.98
717.18
-0.60 2.31
5,979,261.996
618,887.434
2.01
-1.67
894.35
3.88 102.66
894.15
809.35
-2.20 7.25
5,979,260.480
618,892.401
1.58
-5.52
985.90
5.66 104.77
985.38
900.58
-4.03 14.64
5,979,258.768
618,899.817
1.95
-10.80
1,080.50
6.87 108.98
1,079.42
994.62
-7.06 24.50
5,979,255.895
618,909.724
1.37
-18.35
1,174.93
8.63 110.74
1,172.98
1,088.18
-11.40 36.46
5,979,251.740
618,921.758
1.88
-28.09
1,268.85
9.93 119.88
1,265.67
1,180.87
-17.93 50.08
5,979,245.427
618,935.471
2.09
-40.55
1,363.75
10.20 122.70
1,359.11
1,274.31
-26.55 64.24
5,979,237.037
618,949.771
0.59
-55.09
1,457.62
13.52 127.62
1,450.97
1,366.17
-37.74 79.93
5,979,226.097
618,965.636
3.69
-72.63
1,515.57
15.03 132.99
1,507.13
1,422.33
-47.00 90.80
5,979,217.012
618,976.643
3.46
-86.08
11/18/2019 3:37:16PM
Page 3
COMPASS 5000.15 Build 90
BP
?r. by Final Survey Report
® Hughes
Company:
r+41�9
Company: North America
- ALASKA - BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S-2021-4
Survey Calculation Method:
Minimum Curvature
Design: S-2021-4
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft) (`)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) ("/100usft)
(usft)
1,609.93
15.66
139.23
1,598.13
1,513.33
-64.99
108.06
5,979,199.301
618,994.192
1.87
-110.29
1,704.50
19.79
146.14
1,688.20
1,603.40
-87.96
125.33
5,979,176.606
619,011.817
4.89
-138.81
1,737.16
22.27
147.74
1,718.69
1,633.89
-97.79
131.71
5,979,166.884
619,018.356
7.79
-150.51
1,768.14
23.59
149.19
1,747.22
1,662.42
-108.08
138.02
5,979,156.697
619,024.827
4.63
-162.58
1,800.01
24.95
150.10
1,776.27
1,691.47
-119.38
144.64
5,979,145.500
619,031.622
4.43
-175.68
1,895.26
26.83
152.03
1,861.96
1,777.16
-155.78
164.74
5,979,109.422
619,052.294
2.16
-217.25
1,989.23
25.76
152.73
1,946.20
1,861.40
-192.66
184.04
5,979,072.856
619,072.178
1.19
-258.84
2,084.22
26.47
155.63
2,031.50
1,946.70
-230.30
202.23
5,979,035.519
619,090.965
1.54
-300.53
2,178.02
29.06
158.33
2,114.50
2,029.70
-270.52
219.27
5,978,995.577
619,108.641
3.07
-343.89
2,211.11
31.36
158.95
2,143.09
2,058.29
-286.02
225.34
5,978,980.170
619,114.946
7.01
-360.35
2,242.35
33.60
159.95
2,169.44
2,084.64
-301.73
231.22
5,978,964.558
619,121.078
7.37
-376.90
2,272.90
35.69
161.09
2,194.57
2,109.77
-318.11
237.01
5,978,948.280
619,127.124
7.16
-393.97
2,305.40
36.32
161.76
2,220.87
2,136.07
-336.22
243.09
5,978,930.270
619,133.495
2.29
-412.70
2,337.03
35.45
162.18
2,246.49
2,161.69
-353.85
248.83
5,978,912.736
619,139.512
2.86
-430.84
2,367.50
34.73
162.12
2,271.42
2,186.62
-370.52
254.20
5,978,896.152
619,145.145
2.37
-447.96
2,400.03
34.75
162.17
2,298.16
2,213.36
-388.16
259.88
5,978,878.601
619,151.107
0.11
-466.09
2,430.92
35.52
162.02
2,323.42
2,238.62
-405.08
265.35
5,978,861.775
619,156.840
2.51
-483.47
2,462.68
37.24
162.40
2,348.99
2,264.19
-423.02
271.10
5,978,843.933
619,162.877
5.46
-501.88
2,494.29
38.29
162.30
2,373.97
2,289.17
-441.46
276.97
5,978,825.583
619,169.039
3.33
-520.80
2,526.79
39.05
162.35
2,399.35
2,314.55
-460.81
283.14
5,978,806.337
619,175.510
2.34
-540.64
2,557.05
39.11
162.61
2,422.84
2,338.04
-479.00
288.88
5,978,788.241
619,181.540
0.58
-559.26
2,588.78
38.58
163.02
2,447.55
2,362.75
-498.02
294.76
5,978,769.325
619,187.721
1.86
-578.67
2,622.51
38.26
163.79
2,473.98
2,389.18
-518.10
300.75
5,978,749.337
619,194.025
1.71
-599.06
2,651.20
37.01
164.08
2,496.70
2,411.90
-534.94
305.60
5,978,732.584
619,199.139
4.40
-616.07
2,683.75
35.84
164.07
2,522.89
2,438.09
-553.52
310.90
5,978,714.086
619,204.736
3.59
-634.82
2,714.44
35.14
165.22
2,547.88
2,463.08
-570.70
315.62
5,978,696.985
619,209.727
3.15
-652.06
2,745.52
34.73
166.06
2,573.36
2,488.56
-587.94
320.03
5,978,679.817
619,214.414
2.03
-669.20
11/18/2019 3:37:16PM
Page 4
COMPASS 5000.15 Build 90
Survey
MD
BP
Azi
11tir
TVD
TVDSS
NIS
Final Survey Report
HugheBaker s
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
V. Sec
Project:
PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
V)
Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well:
S-202
North Reference:
True
(usft)
Wellbore:
S-2021-4
Survey Calculation Method:
Minimum Curvature
(usft)
Design:
S-2021-4
Database:
EDM R5K - Alaska PROD - ANCP1
166.52
Survey
MD
Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
2,776.92
34.62
166.52
2,599.18
2,514.38
-605.30
324.27
5,978,662.533
619,218.923
0.90
-686.35
2,808.35
34.43
167.66
2,625.07
2,540.27
-622.66
328.25
5,978,645.237
619,223.177
2.14
-703.38
2,840.13
33.68
168.84
2,651.40
2,566.60
-640.08
331.87
5,978,627.876
619,227.079
3.15
-720.28
2,871.93
32.76
170.21
2,678.01
2,593.21
-657.21
335.04
5,978,610.800
619,230.519
3.73
-736.70
2,903.48
31.69
171.88
2,704.70
2,619.90
-673.83
337.66
5,978,594.229
619,233.405
4.41
-752.41
2,934.19
30.55
173.39
2,730.99
2,646.19
-689.57
339.70
5,978,578.525
619,235.692
4.50
-767.06
2,965.77
29.72
174.22
2,758.30
2,673.50
-705.33
341.42
5,978,562.795
619,237.654
2.94
-781.57
2,997.97
28.94
174.46
2,786.37
2,701.57
-721.03
342.97
5,978,547.127
619,239.458
2.45
-795.94
3,029.12
28.38
175.18
2,813.70
2,728.90
-735.90
344.32
5,978,532.273
619,241.044
2.11
-809.50
3,039.76
28.20
175.15
2,823.07
2,738.27
-740.93
344.75
5,978,527.256
619,241.548
1.70
-814.07
3,078.60
27.19
175.78
2,857.46
2,772.66
-758.92
346.17
5,978,509.288
619,243.263
2.71
-830.37
3,172.96
23.79
177.85
2,942.63
2,857.83
-799.45
348.48
5,978,468.802
619,246.206
3.72
-866.63
3,205.03
22.91
180.16
2,972.07
2,887.27
-812.16
348.70
5,978,456.102
619,246.633
3.96
-877.75
3,235.87
21.10
182.40
3,000.66
2,915.86
-823.71
348.45
5,978,444.550
619,246.567
6.47
-887.63
3,267.80
19.97
185.16
3,030.57
2,945.77
-834.88
347.72
5,978,433.367
619,246.013
4.66
-896.94
3,330.38
18.43
190.19
3,089.67
3,004.87
-855.27
345.01
5,978,412.947
619,243.626
3.61
-913.24
3,424.67
15.61
199.80
3,179.84
3,095.04
-881.88
338.07
5,978,386.226
619,237.113
4.21
-932.83
3,519.82
13.16
209.96
3,272.01
3,187.21
-903.32
328.32
5,978,364.640
619,227.706
3.69
-946.53
3,614.63
11.39
223.06
3,364.67
3,279.87
-919.51
316.54
5,978,348.261
619,216.181
3.47
-954.67
3,709.05
11.22
239.43
3,457.28
3,372.48
-931.00
302.26
5,978,336.550
619,202.087
3.39
-957.49
3,802.91
11.42
256.02
3,549.34
3,464.54
-937.89
285.38
5,978,329.393
619,185.316
3.46
-955.02
3,897.98
12.45
270.20
3,642.37
3,557.57
-940.13
265.99
5,978,326.847
619,165.970
3.26
-947.28
3,992.53
13.96
280.13
3,734.43
3,649.63
-938.09
244.57
5,978,328.549
619,144.519
2.88
-934.81
4,086.74
16.20
289.05
3,825.40
3,740.60
-931.80
220.95
5,978,334.463
619,120.810
3.42
-917.56
4,181.50
18.44
297.30
3,915.88
3,831.08
-920.61
195.13
5,978,345.242
619,094.818
3.50
-894.96
4,276.00
20.84
304.35
4,004.88
3,920.08
-904.26
167.97
5,978,361.152
619,067.397
3.56
-867.23
4,370.62
23.74
309.10
4,092.43
4,007.63
-882.75
139.28
5,978,382.207
619,038.377
3.61
-834.26
11/18/2019 3:37:16PM Page 5 COMPASS 5000.15 Build 90
b
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
S-2021-4
Design:
S-2021-4
Survey
MD I
(usft)
4,465.23
4,559.49
4,654.63
4,748.63
4,844.09
4,938.94
5,033.31
5,127.83
5,222.28
5,317.37
5,411.18
5,505.83
5,601.08
5,695.74
5,790.51
Tie -in -Point
5,849.00
KOP - Top of Window
5,861.99
Interpolated Azimuth
5,889.58
Interpolated Azimuth
5,921.93
Interpolated Azimuth
5,955.28
Interpolated Azimuth
5,984.90
Interpolated Azimuth
11/18/2019 3:37:16PM
In
BP
Final Survey Report
Local Co-ordinate Reference: Well S-202
TVD Reference: ACTUAL KB P272 @ 84.80usft
MD Reference: ACTUAL KB P272 @ 84.80usft
North Reference: True
Survey Calculation Method: Minimum Curvature
Database: EDM R5K - Alaska PROD - ANCP1
Baker
Hughes
°)
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft
(usft)
26.51
313.05
4,178.09
4,093.29
-856.32
109.06
5,978,408.154
619,007.747
3.42
-796.27
28.92
314.66
4,261.53
4,176.73
-825.93
77.47
5,978,438.032
618,975.682
2.68
-754.17
32.06
316.04
4,343.50
4,258.70
-791.58
43.58
5,978,471.842
618,941.245
3.38
-707.47
35.01
317.55
4,421.85
4,337.05
-753.71
8.05
5,978,509.134
618,905.125
3.26
-656.92
37.86
316.99
4,498.64
4,413.84
-712.08
-30.42
5,978,550.149
618,866.001
3.01
-601.63
40.92
317.47
4,571.94
4,487.14
-667.89
-71.29
5,978,593.677
618,824.446
3.24
-542.94
44.03
316.43
4,641.53
4,556.73
-621.34
-114.79
5,978,639.526
618,780.210
3.38
-480.88
46.72
316.86
4,707.93
4,623.13
-572.43
-160.97
5,978,687.697
618,733.269
2.86
-415.44
49.76
316.70
4,770.82
4,686.02
-521.10
-209.21
5,978,738.255
618,684.221
3.22
-346.87
52.83
318.18
4,830.28
4,745.48
-466.43
-259.38
5,978,792.110
618,633.198
3.45
-274.46
55.33
319.19
4,885.31
4,800.51
-409.37
-309.52
5,978,848.365
618,582.161
2.80
-199.97
58.24
320.57
4,937.15
4,852.35
-348.82
-360.53
5,978,908.098
618,530.203
3.31
-122.04
61.08
322.45
4,985.26
4,900.46
-284.47
-411.66
5,978,971.617
618,478.055
3.43
-40.75
64.15
323.49
5,028.80
4,944.00
-217.37
-462.27
5,979,037.898
618,426.397
3.39
42.66
66.23
324.08
5,068.57
4,983.77
-147.97
-513.09
5,979,106.479
618,374.489
2.27
128.17
66.82
324.32
5,091.87
5,007.07
-104.46
-544.47
5,979,149.484
618,342.423
1.08
181.54
68.42
324.32
5,096.81
5,012.01
-94.70
-551.47
5,979,159.128
618,335.264
12.32
193.49
69.96
324.44
5,106.61
5,021.81
-73.74
-566.49
5,979,179.849
618,319.915
5.60
219.15
74.56
324.56
5,116.47
5,031.67
-48.66
-584.38
5,979,204.638
618,301.634
14.22
249.81
78.68
324.66
5,124.18
5,039.38
-22.22
-603.17
5,979,230.779
618,282.432
12.36
282.11
81.55
324.75
5,129.27
5,044.47
1.60
-620.02
5,979,254.320
618,265.200
9.69
311.16
Page 6
COMPASS 5000.15 Build 90
rR*' BP
` Baker
100*0Z p Final Survey Report Hughes
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
5-2021-4
Design:
S-2021-4
Survey
MD Inc
(usft) V)
6,016.70
Interpolated Azimuth
6,050.58
6,079.64
6,111.03
6,142.77
6,174.60
6,242.39
6,273.28
6,368.30
6,462.86
6,558.34
6,652.61
6,747.70
6,842.65
6,937.73
7,032.36
7,126.75
7,221.68
7,316.62
7,411.51
7,506.46
7,601.53
7,696.19
7,791.41
7,886.60
7.981.64
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well S-202
ACTUAL KB P272 @ 84.80usft
ACTUAL KB P272 @ 84.80usft
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
11/18/2019 3:37:16PM Page 7 COMPASS 5000.15 Build 90
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
84.11
325.43
5,133.24
5,048.44
27.47
-638.08
5,979,279.900
618,246.739
8.33
342.59
88.93
325.43
5,135.29
5,050.49
55.31
-657.26
5,979,307.428
618,227.118
14.23
376.29
90.92
325.27
5,135.33
5,050.53
79.21
-673.78
5,979,331.066
618,210.221
6.87
405.25
93.04
325.42
5,134.25
5,049.45
105.02
-691.62
5,979,356.582
618,191.978
6.77
436.52
94.33
325.47
5,132.21
5,047.41
131.10
-709.59
5,979,382.377
618,173.602
4.07
468.09
94.80
326.03
5,129.67
5,044.87
157.33
-727.44
5,979,408.315
618,155.333
2.29
499.73
95.20
326.09
5,123.76
5,038.96
213.36
-765.15
5,979,463.731
618,116.747
0.60
567.10
95.11
326.91
5,120.99
5,036.19
239.01
-782.13
5,979,489.111
618,099.363
2.66
597.81
95.14
330.06
5,112.50
5,027.70
319.68
-831.59
5,979,568.980
618,048.630
3.30
692.40
95.29
331.95
5,103.90
5,019.10
402.04
-877.24
5,979,650.600
618,001.688
2.00
786.55
95.20
334.64
5,095.17
5,010.37
486.97
-919.96
5,979,734.835
617,957.625
2.81
881.47
92.69
333.18
5,088.69
5,003.89
571.43
-961.32
5,979,818.614
617,914.936
3.08
975.29
92.34
332.26
5,084.51
4,999.71
655.86
-1,004.86
5,979,902.337
617,870.065
1.03
1,070.18
92.40
331.52
5,080.59
4,995.79
739.54
-1,049.56
5,979,985.288
617,824.048
0.78
1,165.00
92.40
329.37
5,076.61
4,991.81
822.17
-1,096.41
5,980,067.159
617,775.892
2.26
1,259.99
92.40
327.35
5,072.64
4,987.84
902.66
-1,146.01
5,980,146.845
617,725.030
2.13
1,354.49
92.40
324.16
5,068.69
4,983.89
980.60
-1,199.07
5,980,223.934
617,670.742
3.38
1,448.52
92.31
324.88
5,064.79
4,979.99
1,057.84
-1,254.12
5,980,300.282
617,614.476
0.76
1,542.93
91.42
323.51
5,061.70
4,976.90
1,134.80
-1,309.64
5,980,376.339
617,557.755
1.72
1,637.33
90.16
325.45
5,060.39
4,975.59
1,212.01
-1,364.76
5,980,452.668
617,501.421
2.44
1,731.76
90.34
328.53
5,059.98
4,975.18
1,291.63
-1,416.48
5,980,531.443
617,448.448
3.25
1,826.56
90.13
332.06
5,059.59
4,974.79
1,374.19
-1,463.58
5,980,613.241
617,400.045
3.72
1,921.62
88.91
329.10
5,060.38
4,975.58
1,456.63
-1,510.07
5,980,694.926
617,352.257
3.38
2,016.26
88.90
326.17
5,062.20
4,977.40
1,537.03
-1,561.03
5,980,774.505
617,300.035
3.08
2,111.37
88.01
324.26
5,064.77
4,979.97
1,615.18
-1,615.31
5,980,851.774
617,244.524
2.21
2,206.18
89.41
323.98
5,066.91
4,982.11
1,692.17
-1,671.00
5,980,927.859
617,187.628
1.50
2,300.69
11/18/2019 3:37:16PM Page 7 COMPASS 5000.15 Build 90
BP
��
it bp Final Survey Report Baker Hughes
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S-2021-4
Survey Calculation Method:
Minimum Curvature
Design: S -202L4
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
8,075.98
89.88
325.99
5,067.49
4,982.69
1,769.42
-1,725.12
5,981,004.243
617,132.286
2.19
2,394.66
8,170.61
89.82
324.29
5,067.74
4,982.94
1,847.07
-1,779.21
5,981,081.014
617,076.979
1.80
2,488.94
8,265.60
89.88
323.24
5,067.99
4,983.19
1,923.69
-1,835.36
5,981,156.725
617,019.628
1.11
2,583.36
8,360.32
89.85
321.60
5,068.21
4,983.41
1,998.75
-1,893.12
5,981,230.856
616,960.685
1.73
2,677.25
8,455.31
90.40
322.34
5,068.00
4,983.20
2,073.57
-1,951.64
5,981,304.733
616,900.990
0.97
2,771.30
8,550.03
91.87
324.42
5,066.13
4,981.33
2,149.57
-2,008.13
5,981,379.823
616,843.310
2.69
2,865.35
8,645.22
91.97
324.40
5,062.94
4,978.14
2,226.94
-2,063.49
5,981,456.293
616,786.727
0.11
2,960.03
8,740.48
91.85
325.32
5,059.76
4,974.96
2,304.79
-2,118.29
5,981,533.262
616,730.705
0.97
3,054.85
8,835.52
91.88
325.26
5,056.67
4,971.87
2,382.88
-2,172.38
5,981,610.473
616,675.388
0.07
3,149.52
8,930.34
91.17
324.70
5,054.14
4,969.34
2,460.50
-2,226.78
5,981,687.219
616,619.774
0.95
3,243.94
9,026.05
91.20
323.43
5,052.17
4,967.37
2,537.98
-2,282.93
5,981,763.788
616,562.401
1.33
3,339.11
9,098.17
91.17
323.91
5,050.67
4,965.87
2,596.07
-2,325.65
5,981,821.187
616,518.771
0.67
3,410.77
9,193.85
91.11
326.52
5,048.77
4,963.97
2,674.63
-2,380.22
5,981,898.864
616,462.966
2.73
3,506.09
9,288.78
91.42
329.11
5,046.67
4,961.87
2,754.94
-2,430.77
5,981,978.361
616,411.154
2.75
3,600.91
9,383.66
91.36
333.02
5,044.37
4,959.57
2,837.94
-2,476.65
5,982,060.611
616,363.965
4.12
3,695.73
9,478.36
91.88
335.99
5,041.69
4,956.89
2,923.37
-2,517.39
5,982,145.381
616,321.877
3.18
3,790.09
9,573.35
91.82
333.69
5,038.63
4,953.83
3,009.30
-2,557.75
5,982,230.650
616,280.161
2.42
3,884.69
9,668.60
91.73
331.72
5,035.68
4,950.88
3,093.90
-2,601.41
5,982,314.539
616,235.172
2.07
3,979.79
9,762.97
92.48
334.20
5,032.21
4,947.41
3,177.89
-2,644.28
5,982,397.832
616,190.979
2.74
4,073.96
9,858.05
92.58
338.73
5,028.01
4,943.21
3,264.95
-2,682.20
5,982,484.275
616,151.686
4.76
4,168.33
9,952.81
92.40
342.44
5,023.89
4,939.09
3,354.23
-2,713.66
5,982,573.029
616,118.813
3.92
4,261.38
10,047.49
92.95
341.60
5,019.47
4,934.67
3,444.18
-2,742.85
5,982,662.504
616,088.198
1.06
4,353.89
10,142.38
91.34
345.18
5,015.92
4,931.12
3,535.03
-2,769.95
5,982,752.904
616,059.663
4.13
4,446.12
10,173.86
91.33
347.17
5,015.19
4,930.39
3,565.59
-2,777.47
5,982,783.336
616,051.660
6.32
4,476.35
10,206.20
91.36
349.19
5,014.43
4,929.63
3,597.23
-2,784.10
5,982,814.869
616,044.537
6.25
4,507.07
10,237.05
91.33
350.24
5,013.70
4,928.90
3,627.58
-2,789.60
5,982,845.120
616,038.550
3.40
4,536.11
10,332.33
91.42
352.50
5,011.42
4,926.62
3,721.75
-2,803.89
5,982,939.042
616,022.767
2.37
4,624.82
11/18/2019 3:37:16PM
Page 8
COMPASS 5000.15 Build 90
BP
by
Final Survey Report
Baker S
%N�
Hughes
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Site: S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Well: S-202
North Reference:
True
Wellbore: S-2021-4
Survey Calculation Method:
Minimum Curvature
Design: S-2021-4
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi
TVD
TVDSS N/S
E/W
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft) (usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
10,427.14
91.39
352.46
5,009.09
4,924.29
3,815.71
-2,816.30
5,983,032.792
616,008.875
0.05
4,712.42
10,521.65
90.04
351.94
5,007.91
4,923.11
3,909.34
-2,829.12
5,983,126.194
615,994.567
1.53
4,799.93
10,583.61
89.88
354.85
5,007.96
4,923.16
3,970.88
-2,836.25
5,983,187.611
615,986.466
4.70
4,856.80
10,616.42
89.88
357.21
5,008.02
4,923.22
4,003.61
-2,838.52
5,983,220.296
615,983.676
7.19
4,886.29
10,710.57
89.94
358.78
5,008.17
4,923.37
4,097.70
-2,841.81
5,983,314.314
615,978.890
1.67
4,969.44
10,805.27
89.94
358.24
5,008.27
4,923.47
4,192.37
-2,844.28
5,983,408.922
615,974.926
0.57
5,052.67
10,899.73
89.88
358.54
5,008.42
4,923.62
4,286.79
-2,846.93
5,983,503.283
615,970.774
0.32
5,135.79
10,994.50
88.42
359.47
5,009.83
4,925.03
4,381.53
-2,848.58
5,983,597.979
615,967.626
1.83
5,218.68
11,090.23
86.45
0.96
5,014.11
4,929.31
4,477.16
-2,848.22
5,983,693.590
615,966.467
2.58
5,301.34
11,185.16
84.94
2.22
5,021.24
4,936.44
4,571.78
-2,845.59
5,983,788.233
615,967.590
2.07
5,381.99
11,280.11
84.93
4.00
5,029.62
4,944.82
4,666.22
-2,840.46
5,983,882.731
615,971.222
1.87
5,461.24
11,375.54
84.07
5.18
5,038.77
4,953.97
4,760.90
-2,832.86
5,983,977.515
615,977.319
1.53
5,539.46
11,470.41
83.85
5.72
5,048.75
4,963.95
4,854.81
-2,823.90
5,984,071.554
615,984.787
0.61
5,616.34
11,506.00
83.85
5.72
5,052.56
4,967.76
4,890.02
-2,820.37
5,984,106.812
615,987.755
0.00
5,645.07
Projection to TD
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
5,790.51
5,068.57
-147.97
-513.09
Tie -in -Point
5,849.00
5,091.87
-104.46
-544.47
KOP - Top of Window
5,861.99
5,096.81
-94.70
-551.47
Interpolated Azimuth
5,889.58
5,106.61
-73.74
-566.49
Interpolated Azimuth
5,921.93
5,116.47
-48.66
-584.38
Interpolated Azimuth
5,955.28
5,124.18
-22.22
-603.17
Interpolated Azimuth
5,984.90
5,129.27
1.60
-620.02
Interpolated Azimuth
6,016.70
5,133.24
27.47
-638.08
Interpolated Azimuth
11,506.00
5,052.56
4,890.02
-2,820.37
Projection to TD
11/18/2019 3:37:16PM
Page 9
COMPASS 5000.15 Build 90
BP
Final Survey Report
Company:
North America - ALASKA - BP
Project:
PBU
Site:
S
Well:
S-202
Wellbore:
5-20214
Design:
S -202L4
Local Co-ordinate Reference:
Well S-202
ND Reference:
ACTUAL KB P272 @ 84.80usft
MD Reference:
ACTUAL KB P272 @ 84,80usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Baker
Hughes
1111812019 3:37:16PM Page 10 COMPASS 5000.15 Build 90
Obp
Project: PBS
Site: S
WELL DETAILS: 5-202
WELLBORE DETAILS: S-202
REFERENCE INFORMATION
Ground Level: 37.90
Parent Wellbore: S-2021-1
Co-ordinate (WE) Reference: Well S-202, True North
Well: 5-202
Northing: 5979262.560
Tie on MD: 6848.25
Vertical (TVD) Reference: ACTUAL KB P272 @ 84.80usft
Wellbore: 5 202
Easting: 618885.120
S-122PB2
Section (VS) Reference: Slot - OONN, O.00E) S4 80usft
A @
Design: S-202
Latittude: 70° 21' 7.196 N
Measured Depth Reference.ACT
Longitude: 149° 2' 4.867 W
Calculation Method: Minimum Curvature
AOGCC - Offsets within 500ft
Easting (2000 usfUin)
Baker
Hughes
Easting (2000 usfUin)
610000 611000
612000
613000
614000 615000 616000 617000 618000 619000 620000 6 21 00 0 622000 623000
624000 625000 626000
5-102
S-122
S-122PB2
5-1221`133 1Q0
--S-122P61
i
5987000
5-200A
S
_ � 2 S, 20
Q
1 S 20212 S-2021- - -
3, S-
-
-
5987000
021-4
�oo�
6o 0
X00 i
I
S-2021-2
5986000
1 _
_
66—
5986000
S-03 00
_ _ _ - 5-202L
5985000
102P 1 _
g000 i
S-151`81
-_- - - I v. _ - -
-15- -
-
—�..
S -13A
...000
5985000
5000 - S-202
- 5-16 0
5-2021-4 9000
,
5984000
c
S -44A
- -
1 X0000 00
O
- -----
5984000
Z
NKUPST
O
En
100 p'
00 8000
O 5983000
-�
- O4009- - - ---
-� -
-5983000(o
�
S-401 ®®
� ;,000N
�0p
O
�O
m
000 70 0
O
c
0 5982000
-
O i
-� -
5982000
00p0
00 ® 6000-
Z
S -01C
po 0
h
20 6 00
AO 0
5981000
ro o0 o
o
- -- - -
i
------t-----5981000
S-01
t -1
0 �Op
S 01A 01
0
5980000
�y
-
5980000
0 o
S-17CPB1 S-17iKPB1
0 Mira
�9
o
S -28B
S-17CP-IB2- -
Q
oo
S -28A S-1351`81
O S-218
5979000
In
`
0
P
5979000
S-126
0 0 'I
0�' ! 5-18
0 �o 0
-S-27
5978000--,
5-128PB2
O
-
5978000
d o_
00 S-40
9 1 ""
0 5-249
610000 611000
612000
613000
0
614000 615000 61600
81 61 ��5 19000 620000 621000 s72nnn
F�3nnn
r"annn a9tnnn a�annn
Easting (2000 usfUin)
Obp
North America - ALASKA - BP
PBU
S
S-202
S -202L4
S -202L4
500292364763
AOGCC Offset Well Report
18 November, 2019
Baker
Hughes"
• BP
by Anticollision Report Baker S
Hughes
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
S-2021-4
Reference Design:
S-2021-4
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well S-202
ACTUAL KB P272 @ 84.80usft
ACTUAL KB P272 @ 84.80usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference S-2021-4
Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA
Depth Range: Unlimited Scan Method: Tray. Cylinder North
Results Limited by: Maximum centre distance of 500 Error Surface: Pedal Curve
Survey Program
Date 11/18/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
98.76
1,457.62 Survey #1 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
1,515.57
3,039.76 Survey #2 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
3,078.60
3,078.60 Survey #3 (S-2021-1)
GYRO -WD -SS
Gyro while drilling single shots
3,172.96
5,790.51 Survey #4 (S-2021-1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
5,849.00
6,016.70 Survey #1 (S-2021-4)
INC+TREND
Inclinometer+ known azi trend
6,050.58
6,174.60 Survey #2 (S-2021-4)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
6,242.39
11,506.00 Survey #3 (S-2021-4)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
11/18/2019 3:46:33PM Page 2 of 4 COMPASS 5000.15 Build 90
BP
+� j'> Baker
P`'� Anticollision Report Hughes
d4�
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
ACTUAL KB P272 @ 84.80usft
Reference Site:
S
MD Reference:
ACTUAL KB P272 @ 84.80usft
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
S-20214
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-2021-4
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
EX NKUPST
HURLST
Plans: Gwydyr Development (SHL)
S
S-01 - S-01 - S-01
7,003.43
5,475.00
290.76
S -01 -S -01A -S -01A
7,003.43
5,475.00
290.76
S-01 - S-01 B- S-01 B
7,001.48
5,475.00
289.52
S-01 - S -01C - S -01C
7,001.48
5,475.00
289.52
S-02 - IGNORE ME - Plan 3
4,975.06
5,075.00
464.39
S-02 - S-02 - S-02
4,974.96
5,075.00
464.38
S-02 - S -02A - S -02A
4,975.12
5,075.00
464.40
S-02 - S-02ALl - S-02ALl
4,975.12
5,075.00
464.40
S-02 - S-02ALl P81 - S-02ALl PB1
4,975.12
5,075.00
464.40
S-02 - S-02AP81 - S-02APB1
4,975.12
5,075.00
464.40
S-03 - S-03 - S-03
8,617.52
6,250.00
315.01
S-115 - S-115 - S-115
8,197.63
5,600.00
434.20
S-118 - S-118 - S-118
6,290.19
5,400.00
170.54
S-126 - S-126 - S-126
542.73
525.00
112.68
S-128 - S-128 - S-128
593.23
575.00
165.20
S-128 - S-128PB1 - S-128PB1
486.56
468.00
160.96
S-128 - S-128PB2 - S-128PB2
593.23
575.00
164.84
S-134 - S-134 - S-134
1,258.58
1,250.00
108.02
S-135 - S-135 - S-135
225.31
225.00
32.81
S-135 - S-135PB1 - S-135PB1
225.31
225.00
32.81
S-135 - S-135PB2 - S-135PB2
225.31
225.00
32.81
S-15 - S-15 - S-15
738.44
725.00
231.57
S-15 - S-15PB1 - S -15P81
738.44
725.00
231.57
S-16 - S-16 - S-16
741.23
725.00
125.58
S-16 - S-16PB1 - S-16PB1
741.23
725.00
125.58
S-17 - S-17 - S-17
667.27
650.00
13.48
S-17 - S -17A - S -17A
667.27
650.00
13.48
S-17 - S-17ALl - S-17ALl
667.27
650.00
13.48
S-17 - S-17AL1 PB1 - S-17AL1 PB1
667.27
650.00
13.48
S-17 - S-17APB1 - S-17APB1
667.27
650.00
13.48
S-17 - S -17B - S -17B
667.27
650.00
13.48
S-17 - S -17C - S -17C
667.27
650.00
13.48
S-17 - S-17CPB1 - S-17CPB1
667.27
650.00
13.48
S-17 - S-17CPB2 - S-17CPB2
667.27
650.00
13.48
S-18 - S-18 - S-18
634.48
625.00
96.48
S-18 - S-1 8A - S-1 8A
637.51
625.00
96.55
S-18 - S -18B - S -18B
637.51
625.00
96.55
S-200 - S -200A- S -200A
11,054.31
7,725.00
383.60
S-202 - S-202 - S-202
8,527.31
8,550.00
220.90
S-202 - S-2021-1 - S-2021-1
9,891.77
9,950.00
103.44
S-202 - S-2021-2 - S-2021-2
9,802.77
9,850.00
146.78
S-202 - S-2021-3 - S-2021-3
8,145.19
8,150.00
80.62
S-214 - PLAN S-214 - NB - S-214 WP09 NB
6,429.18
5,675.00
175.37
S-214 - PLAN S -214L1 - OBD - S-2141-1 WP09 - OBD
6,429.18
5,675.00
175.37
S-214 - PLAN S-2141-1-01 - OBB - S-2141-1-01 WP09 OBB
6,429.18
5,675.00
175.37
S-214 - PLAN S-2141-1-02 - OBC - S-2141-1-02 WP09 - OBC
6,429.18
5,675.00
175.37
S-214 - PLAN S-2141-2 - OBA- S-2141-2 WP09 - OBA
6,429.18
5,675.00
175.37
S-214 - PLAN S-2141-3 - OA - S-2141-3 WP09 - OA
6,429.18
5,675.00
175.37
11118/2019 3:46:33PM Page 3 of 4 COMPASS 5000.15 Build 90
BP
p Anticollision Report Baker
Hughes
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
S-2021-4
Reference Design:
S -202L4
Summary
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Site Name
Offset Well - Wellbore - Design
S
S-215 - S-215 - S-215
S-217 - S-217 - S-217
S-218 - S-218 - S-218
S-27 - 5-27 - S-27
S-27 - S -27A - S -27A
S-27 - S-27APB1 - S-27APB1
5-27 - S -27B - S -27B
S-28 - S-28 - S-28
S-28 - S -28A - S -28A
S-28 - S -28B - S -28B
S-28 - S-28BPB1 - S-28BPB1
S-29 - S-29 - S-29
S-29 - S -29A - S -29A
5-29 - S-29ALl - S-29ALl
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown) - Plan S -40B v3.0
(Kodiak Brown)
S-40 - S-40 - S-40
S-40 - S -40A - S -40A
S-44 - S -44A - S -44A
Well S-202
ACTUAL KB P272 @ 84.80usft
ACTUAL KB P272 @ 84.80usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
1,461.83 1,475.00 221.25
909.87 900.00 53.86
1,086.84 1,075.00 28.16
5,145.16 5,250.00 457.31
5,145.16 5,250.00 457.31
5,145.16 5,250.00 457.31
5,145.01 5,250.00 457.30
5,661.00 5,375.00 160.68
5,661.00 5,375.00 160.68
5,661.40 5,375.00 160.56
5,661.40 5,375.00 160.56
3,956.25 4,350.00 314.36
3,953.48 4,350.00 314.36
3,953.48 4,350.00 314.36
46.90 46.60 17.48
891.75 875.00 18.57
891.75 875.00 18.57
8,114.80 5,800.00 499.03
11/18/2019 3:46.33PM Page 4 of 4 COMPASS 5000.15 Build 90
THE STATE
'ALASKA
GOVERNOR MIKE DUNLEAVY
Kenneth Allen
Engineering Team Lead
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
Re: Prudhoe Bay Field, Schrader Bluff Oil Pool, PBU S -202L4
BP Exploration (Alaska), Inc.
Permit to Drill Number: 219-124
Surface Location: 3060' FSL, 4567' FEL, SEC. 35, T12N, R12E, UM
Bottomhole Location: 4185' FSL, 1465' FEL, SEC. 27, TI 2N, R12E, UM
Dear Mr. Allen:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.olaska.gov
Enclosed is the approved application for the permit to drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 219-120, API No. 50-029-23647-
00-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
essie L. Chmielowski
Commissioner
DATED this day of September, 2019.
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMISSIC
PERMIT TO DRILL
20 AAC 25.005
la. Type of Work:1
b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp El1
c. Specify if well is proposed for:
Drill ❑ Lateral 0
Stratigraphic Test ❑ Development - Oil 0 Service - Winj ❑ Single Zone Z
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket Q Single Well ❑
11 Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 29S105380 ,
PBU S-2021_4 -
3 Address:
6. Proposed Depth: ,1
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 13000' TVD: 5099'
PRUDHOE BAY, SCHRADER
BLUFF OIL
4a. Location of Well Governmental Section :
( )
7. Property Designation (Lease Number):
AdL 028257 & 028258
g DNR Approval Number:
13. Approximate spud date:
Surface: 3060' FSL, 4567' FEL, Sec. 35, T12N, R12E, UM
3174' FSL, 5232' FEL, Sec. 35, T12N, R12E, UM
83-47
October 10, 2019
Top of Productive Horizon:
9. Acres in Property: 2560
14. Distance to Nearest Property:
Total Depth: 4185' FSL, 1465' FEL, Sec. 27, T12N, R12E, UM
2000
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 78.28 feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 618885 - y- 5979263 Zone - ASP 4
GL Elevation above MSL: 37.9 feet
1900
16. Deviated wells: Kickoff Depth: 610 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees
Downhole: 3611 Surface: 2719
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weiqht Grade Coupling Length
MD TVD MD TVD (includinq staqe data)
42" 20" x 34" 215.5# A-53 115'
Surface Surface 115' 115' 260 sx Arctic Set (ADD
13-3/2" 10-3/4" 45.5# Vam 21 3130'
Surface Surface 3130' 2887' ;'s8elE LiteCrete, x Class 'G'
9-7/8" 7-5/8" 29.7# L-80 VamTop HC 5810'
Surface Surface 5810' 5062' te,12" sx Class'G'
6-3/4" 4-1/2" 12.6# L-80 DWC 7190'
5810' 5062' 13000' 5099'
Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
Casing Length Size Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes ❑ No ❑
20. Attachments Property Plat BOP Sketch 0 Drilling Program 10 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch Q Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements R1
21' Verbal Approval: Commission Representative: Date
hereby certify a e foregoing is true and the procedure approved herein will not be deviated Contact Name Gorham. Bradlev M
from without prior written approval.
Authorized Name Allen, Kenneth W Contact Email Bradlev.Gorham(abp.com
Authorized Title Engineering Team Lead Contact Phone
��...
Authorized Signature } C.�—-.-�- Date
Commission Use Onivl
Permit to Drill
Permit Approval
See cover letter for other
Number: 'layr
API : 50- OZ q 6' �^ �QD
Date:
1�
requirements:
q
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: EV
SZ50 k s ®/
Other: '''C VE TeST 7b 3 i
Samples req'd: Yes ❑ No oY Mud log req'd: Yes No
�,—❑
�.j��. , V t�S 4_16_9 .r ._ H2S measures Yes ❑ No G�y% Directional svy req'd: Yes LV'/ No
`❑/
re -J l � � 0 7 "Ceiii f A5 Spacing^ exception req'd: Yes ❑ No LAY Inclination -only svy req'd: Yes ❑ No Lf
Post initial injection MIT req'd: Yes ❑ No ❑
•`"-�
�' Z APPROVED BY
THE COMMISSION Date:
Approved by:� L �� COMMISSIONER
ORIGINAL
Form 10-401 Revised 5/2017 This permit is valid for 24 months from the date of approval (20 AAC
25.005(g)"St 14 -SepSu�J Form and
/,'/ ttachments in Duplicate
e `� 41! 1%/9
To: Alaska Oil & Gas Conservation Commission
From: Brad Gorham, ODE
Date: September 3, 2019
RE: S-202 Permit to Drill
The S-202 well is scheduled to be drilled by Parker 272 in October 2019. This grassroots well is a
horizontal mulit-lat producer targeting the Schrader Bluff sands. The planned well is a penti-lat,
slimhole design using a 10-3/4" surface casing, 7-5/8" intermediate casing, and 4-1/2" production
liners. The surface casing will be set in the SV3 shale. The intermediate casing will be set in the OBd,
and the production intervals will be completed with slotted liners.
The maximum anticipated surface pressure from the Schrader Bluff with a full column of gas from TD
to surface is 1,848 psi (assumes 8.6 ppg EMW most likely pore pressure and a 0.1 psi/ft gas 105 1574Zwi e—
gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 0. S
rams and an annular). The BOP rams and annular will be tested to 3,500 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on S-202, please do not hesitate to use the contact
information below.
Brad Gorham Office: (907) 564-4649 Cell: (907) 250-3209 Email: Bradlev.aorham(aMp.com
Attachments:
Well Bore Schematic
Directional Package
BOPE Schematic
Diverter Line Layout Diagram
As -Staked Survey
S-202 PTD 1 9/3/2019
Planned Well Summary
Well S-202 Well Producer Target Schrader
Type Ob'ective Bluff
Current Status Grass Roots Well
Estimated Start Date: 10/10/2019 Time to Com lete. 67.2 Da s
Surface
Northing
Easting
I Offsets
I TRS
Location
5,979,262.30
618,885
1 3060' FSL / 4567' FEL
I 12N 12E Sec 35
OBd — S-202
OBb Lateral 1
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,980,141
617,592
5,150
3958' FSL / 565' FEL
12N 12E Sec 34
TD
5,985,530
616,425
5,193
4086' FSL / 1639' FEL
12N 12E Sec 27
OBb Lateral 1
OBc Lateral 2
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,918
617,755
5,186
3733' FSL / 406' FEL
12N 12E Sec 34
TD
5,985,517
616,429
5,084
4072' FSL / 1636' FEL
12N 12E Sec 27
OBc Lateral 2
OBa Lateral 3
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,980,407
617,399
5,094
4227' FSL / 754' FEL
12N 12E Sec 34
TD
5,985,559
616,531
5,133
4113' FSL / 1533' FEL
12N 12E Sec 27
OBa Lateral 3
S-202 PTD 2 9/3/2019
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,583
618,021
5,063
3394' FSL / 146' FEL
12N 12E Sec 34
TD
5,985,587
616,516
5,066
4141' FSL / 1547' FEL
12N 12E Sec 27
S-202 PTD 2 9/3/2019
A
SOA Lateral
OBd - S-202
Planned KOP: 610' Planned 13,000' MD / 5,193' TVDss
TD:
OBb Lateral 1
Planned KOP: 6977' Planned 13,000' MD / 5,084' TVDss
_F TD:
OBc Lateral 2
Planned KOP: 7297' Planned 13,000' MD / 5,133' TVDss
TD:
OBa Lateral 3
Planned KOP: 6025' Planned 13,000' MD / 5,066' TVDss
TD:
OA Lateral 4
Planned KOP: 5810' I PI TnDned 13,000' MD / 5,020' TVDss
Rig: Parker 272 GL -RT: 38.28 RTE ref MSL): 1 78.28
Directional - BHGE WP08
Northing
Easting
TVDss
Offsets
TRS
Landing
point
5,979,366
618,218
5,037
3174' FSL / 5232' FEL
12N 12E Sec 35
TD
5,985,633
616,598
5,020
4185' FSL / 1465' FEL
12N 12E Sec 27
OBd - S-202
Planned KOP: 610' Planned 13,000' MD / 5,193' TVDss
TD:
OBb Lateral 1
Planned KOP: 6977' Planned 13,000' MD / 5,084' TVDss
_F TD:
OBc Lateral 2
Planned KOP: 7297' Planned 13,000' MD / 5,133' TVDss
TD:
OBa Lateral 3
Planned KOP: 6025' Planned 13,000' MD / 5,066' TVDss
TD:
OA Lateral 4
Planned KOP: 5810' I PI TnDned 13,000' MD / 5,020' TVDss
Rig: Parker 272 GL -RT: 38.28 RTE ref MSL): 1 78.28
Directional - BHGE WP08
Hydraulic Fracture Planned? No
S-202 PTD 3 9/3/2019
-43° in the surface section
-90° in the intermediate section
Production section
-1000 - OBb
Maximum Hole Angle:
-1000 - OBc
-1000 - OBd
-97° - OBa
-x930 - OA
All offset wells pass BP anti -collision scan criteria, but some offsets
Close Approach Wells:
must be shut-in to pass scan criteria - reference "Surface and Anti -
Collision Issues" section.
Survey Program:
Reference attached directional program
Nearest Property Line:
-2000'
Nearest Well within Pool:
1 -1,900'
Hydraulic Fracture Planned? No
S-202 PTD 3 9/3/2019
V
Formation Tops and Pore Pressure Estimate o,.5
Formation
Estimated
Formation
Top (TVDss)
Most Likely
Pore
Pressure
(EMW ppg)
Fluid Type (For
Sands)
G1
335
8.4
SV6
1540
8.4
Gas associated with
coals
BPRF
1862
8.6
Gas associated with
coals
EOCU
2080
8.4
Gas associated with
coals
SV5
2180
8.4
Gas associated with
coals
SV4
2318
8.6
Gas associated with
coals
SV3
2719
8.6
Gas Hydrates
SV2
2852
8.7
Gas Hydrates
SV1
3196
8.7
Gas Hydrates
UG4
3534
8.85
UG4A
3575
8.85
UG3
3877
8.85
Heavy Oil
UG1
4424
8.7
Heavy Oil
UG Ma
4688
8.7
Water / Heavy Oil
UG Mb1
4740
8.7
Water/ Heavy Oil
UG Mb2
4750
8.7
Water/ Heavy Oil
UG Mc
4783
8.7
Water / Heavy Oil
SB Na
4920
8.7
Water/ Heavy Oil
SB Nb
4939
8.7
Viscous Oil
SB OA
5047
7.7
Viscous Oil
SB OBa
5082
7.7
Viscous Oil
SB OBb
5107
7.7
Viscous Oil
SB OBc
5143
7.7
Viscous Oil
SB OBd
5173
7.7
Viscous Oil
SB OBe
5245
8.6
SB OBf
5290
8.6
SB OBf Base
5325
8.6
S-202 PTD 4 9/3/2019
Casing/Tubing Program
OBd - S-202
Hole Size
Casing /
Wt/Ft
Grade
Conn
Length
Top
Bottom
35-80
Tbg O.D.
lateral
MD / TVDss
MD / TVDss
42"
20" x 34"
215.5#
A-53
115'
Surface
115'/ 115'
13-1/2"
10-3/4"
45.5#
L-80
Vam 21
3,130'
Surface
3,130'/ 2,809'
9-7/8"
7-5/8"
29.7#
L-80
VamTop HC
6,741
Surface
6,741'/ 5,196'
6-3/4"
4-1/2"
12.6#
L-80
DWC
6,259'
6,109'/ 5,093'
13,000'/ 5,193'
150' la
Tubing
4-1/2"
12.6#
13Cr
Vam Top
5,665'
Surface
5,665' / 4,921'
(-5' into liner TBS)
OBb - Lateral 1
6-3/4" 4-1/2" 12.6# L-80 DWC 5,703' 7,297' / 5,110' 13,000'/ 5,084'
OBc - Lateral 2
6-3/4" 4-1/2" 12.6# L-80 DWC 6,023' 6,977'/ 5,166' 13,000'/ 5,133'
OBa - Lateral 3
6-3/4" 4-1/2" 12.6# L-80 DWC 6,975' 6,025' / 5,068' 13,000'/ 5,066'
OA - Lateral 4
6-3/4" 4-1/2" 12.6# L-80 DWC 7,190' 5,810' / 4,984' ---F000' / 5,020'
Mud Program
Surface Mud Properties: MMH
Depth Interval
DensityPV
(cp)
YP (lb/100
Surface - 13-1/2" TD
8.5-9.1
6-20
35-80
Intermediate Mud Properties: LSND
Depth Interval
Density
PV(cp)
Ib/100ft2
10-3/4" Shoe - TD
1 9.1 -9.5
1 10-20
20-30
Production Mud Properties: Water Based Fluid
Depth Interval
Density
PV (cp)
YP
Ib/1 Oft
7-5/8" Shoe - TD of each
lateral
8.9-9.4
<12
12-20
V/
5a/r vv
a5 5'a0 6-�-
S-202 PTD 5 9/3/2019
Logging Program
Surface I Sam le Catchers - not required for surface hole
Drilling: Dir/GR/RES
Open Hole: None
Cased Hole: None
Intermediate Sample Catchers - as required by Geology
Drilling: Dir/GR/RES/DEN/NEU/AZIMUTHAL DENSITY
Oen Hole: None
Cased Hole: None
Production ample Catchers - as required by Geology
Drilling: Dir/GR/RES/DEN/NEU/AZIMUTHAL DENSITY
Oen Hole: None
Cased Hole: None
Cement Program
Surface
Lead
Oen hole volume + 350% excess in permafrost and 40% excess below permafrost
Basis
Lead TOC
Target surface
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
500 ft MD above casing shoe
Spacer
--100 bbls of Viscosified Spacer weighted to -10.0 Mud Push II
Total Cement
Lead
632.2 bbls, 3549 cuft, 1858 sks of 11.0 ppg LiteCRETE - 1.91 cuft/sk
Volume
Tail
53 bbls, 298 cuft, 255 sks 15.8 ppg Class G - 1.17 cuft/sk
Temp
BHST 55° F
Intermediate
Lead
N/A
Basis
Lead TOC
N/A
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
1500' above Schrader Bluff formation
Spacer
-40 bbls of Viscosified Spacer weighted to -12.50 Mud Push II
Total Cement
Lead
N/A
Volume
Tail
142 bbls, 798 cuft, 687 sks 15.8 ppg Class G - 1.16 cuft/sk
Temp
BHST 94° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Sub -Surface Pressure Management:
The following wells will be shut-in for reservoir pressure purposes while drilling:
• S-201
Anti -Collision:
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling
Offset Well Ownership Information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP.
S-202 PTD 6 9/3/2019
Hydrogen Sulfide
Reference "Drilling Critical Issues" section.
Faults
Reference "Drilling Critical Issues" section.
Drilling Waste Disposal
• There is no annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
S-202 PTD 7 9/3/2019
Well Control
The13-1/2" surface hole will be drilled with a diverter (see attached diverter layout). The 9-7/8" hole and
6-3/4" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure
rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface
pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi.
BOP test frequency for S-202 will be 14 days with function test every 7 days. Except in the event
of a significant operational issue that may affect well integrity or pose safety concerns, an
extension to the 14 day BOP test period should not be requested.
9-7/8" Intermediate Interval
Maximum anticipated BHP
2,381 psi in the SB at 5,325' TVDss 8.6 ppg EMW
Maximum surface pressure
1,848 psi in the SB 0.10psi/ft gas gradient to surface
25 bbls with 11.80 ppg frac gradient.
Kick tolerance
Assumes 8.6 ppg pore pressure in the SB + 0.5 ppg kick
intensity and 9.30 ppg MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Integrity Test — 9-7/8" hole
LOT after drilling 20'-50' of new hole
7-5/8" Casing Test
3,500 psi surface pressure
6-3/4" Production Interval
The base plan is to not conduct the production hole FIT'S. See Variance request 2.
S-202 PTD 8 9/3/2019
Variance Requests
1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling
surface hole, it is requested to drill without a flow paddle for the first portion of the surface
hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in
the flow line (<1000 ft). This is a variance from 20 AAC 25.033.
Procedures/Safeguards with paddle removed:
• Fluid levels will be monitored in the pits for both gains and losses while drilling.
Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred.
® The well will be monitored for flow when the pumps are off at each connection.
• The planned 8.6 — 9.1 ppg fluid will provide over balance to formation fluid.
2. Given that the planned depth of the intermediate casing is in the target reservoir (Schrader
Bluff), and all of the planned production laterals do not depart from the Schrader Bluff
formation, it is requested to forgo the planned FIT's for the production hole intervals.
a. Please note that if there are any issues during the intermediate cement job (ie.losses)
which would result in not meeting AOGCC or BP cement requirements, or there is u -
tube upon drilling out the shoe — this variance will not apply.
b, i}oGCC. V-' EV % rckJ ® -�- 7 t< C e v"*— e t'—+ .1 c 10
CL V.O-Q 4-1 C6 p t-40 "J < Vcx-,r i 4.K.c,a CL ro ut¢�1
PP
i -o ea A A -c as', a r 156
S-202 PTD 9 9/3/2019
S-202 SB Multi-lat operations Summary
Pre -Rig Work:
1. Install a 20" conductor and landing ring and obtain survey of conductor location.
Drilling Rig Operations:
1. MIRU Parker 272.
2. Nipple up diverter system and function test. PU 5" DP and stand back in derrick.
3. MU 13-1/2" drilling assembly directionally drill surface hole to 10-3/4" casing point within the SV3
(3,130' MD).
4. Run and cement the 10-3/4" surface casing back to surface.
5. Nipple down diverter and nipple up wellhead. Nipple up BOPE and test to 3,500 psi. Top to
bottom: annular preventer, 7-5/8" rams, blind/shear, mud cross, 2-7/8" x 5" VBR.
6. Pressure test 10-3/4" casing to 3,500 psi.
7. MU 9-7/8" directional drilling assembly on 5" DP.
8. Displace the well to LSND drilling fluid.
9. Drill out the float equipment and 20' of new formation. Perform a LOT.
10. Drill to TD in the OBd.
11. Circulate and condition the hole as needed. Perform short trip if deemed necessary. POOH.
12. MU and run 7-5/8" casing to TD and cement.._, CeWum-w1, ' `�'" ,..+ }fa;O�C-L �'oT'�ytea
13. Pressure test 7-5/8" casing to 3,500 psi. ��- tT glr�a et r vRs+-.
14. Install and test 7-5/8" pack -off. -roC oe f -A f1-Z.T. d3;outthe
15. Initiate injection into OA to ensure annulus is open for future freeze protection.
16. Swap upper rams to 2-7/8" x 5" VBR's and test.
17. PU 6-3/4" drilling assembly and RIH to the float collar.
18. Displace well over to reservoir drilling fluid system.
19. Flowcheck for 15 minutes. ,
20. Drill out shoe track, circulate and condition mud. Drill 20' of new formation.
21. Flowcheck for 15 minutes and perform FIT. FIT will not be conducted, if variance approval
granted, unless there are issues during the cement job and/or there is U-tube upon do
shoe then this variance will not apply.
22. Directionally drill ahead to TD geo-steering through the OBb to TD.
23. Circulate and condition the hole as needed. Perform short trip if deemed necessary. POOH.
24. MU and run 4-1/2" slotted liner with aluminum billet liner top. Position billet in a tangent section in
preparation for OBc sidetrack. POOH.
25. RIH with 6-3/4" drilling assembly with to aluminium billet. Trench lowside for sidetrack and time
drill off billet for OBc lateral.
26. Directionally drill to the planned TD in the OBc. Circulate and condition mud and POOH.
Contingency: Perform short trip and ensure BHA travels smoothly past aluminium billet, both in
and out of the hole.
27. MU and run 4-1/2" slotted liner with an aluminium billet liner top. Position billet in a tangent
section in preparation for OBd sidetrack. POOH.
28. RIH with 6-3/4" sidetracking / drilling assembly with MWD/GR/Res/Den/Neu to aluminium billet.
Trench lowside for sidetrack and time drill off billet for OBd lateral.
29. Directionally drill ahead to TD geo-steering through the OBd to TD. Contingency: Perform short
trip and ensure BHA travels smoothly past aluminum billet, both in and out of the hole.
30. MU and run 4-1/2" slotted liner with liner hanger and liner top packer. POOH.
S-202 PTD 10 9/3/2019
31. PU the 7-5/8" whipstock assembly. Set the whipstock in position to drill the OBa lateral. Orient
and set whipstock. Shear off the whipstock, mill window and POOH.
32. RIH with 6-3/4" drilling assembly with to whipstock. Directionally drill to the planned TD of OBa
lateral. Circulate and condition mud. Contingency: Perform short trip and POOH.
33. Pull whipstock #1. Run and set 4-1/2" slotted liner and hook hanger. POOH and LD liner running
string. Run Baker Lateral Entry Module #1 with ZXP liner top packer. POOH.
34. PU the 7-5/8" whipstock assembly. Set the whipstock in position to drill the OA lateral. Orient
and set whipstock. Shear off the whipstock, mill window and POOH.
35. RIH with 6-3/4" drilling assembly with to whipstock. Directionally drill to the planned TD of the OA
lateral. Circulate and condition mud. Contingency: Perform short trip and POOH.
36. Pull whipstock #2. Run and set 4-1/2" slotted liner and hook hanger. POOH and LD liner running
string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. POOH.
37. MU 4-1/2", L-80 completion assembly and RIH, tag up in PBR, space out and land tubing hanger.
38. Drop ball & rod and set production packer. Individually test tubing and IA to 3,500 psi each.
39. Shear DCK valve. Reverse circulate diesel freeze protection. Allow diesel to U-tube so that T x IA
is freeze protected down to —2000' TVD.
40. Install and test TWC and test from above and below to 3,500 psi.
41. Nipple down BOPE. Nipple up adapter flange and dry hole tree and test each to 4,500 psi.
42. Secure well and RDMO
Post -Rig Work:
• V: Tree work/pull BPV
• S: Pull B&R/LGLV's/SBHP
• T: Flowback
S-202 PTD 11 9/3/2019
S-202 Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hole: The UG4 and UG3 are expected to be a 8.85 ppg EMW. Formation pressures
will be controlled with a 9.1 — 9.5 ppg mud to TD.
B. Production Hole: The Schrader Bluff O sands are all expected to be at a 7.7 ppg EMW. Reservoir
pressures will be controlled by using 8.9 — 9.4 ppg water based mud.
11. Lost Circulation/Breathing
A. Production Hole: There are 2 expected fault crossings in the production hole.
111. Fault Locations
Formation Where
MD
TVDss
Throw Direction
Lost Circ
Fault Encountered
Intersect
Intersect
and Magnitude
Uncertainty
Potential
Fault 1 - OBd
6282
5165
0-15'
High: >300' Low
Fault 2 - OBd
7316
5150
15-30'
High: >300' Low
/. Integrity Testing
Test Point Test Depth Testtype EMW (lb/gal)
10-3/4" Shoe 20'-50' from the 10-3/4" shoe LOT 11.60 ppg
7-5/8" Shoe 20'-50' from the 7-5/8" shoe FIT N/A
S-202 PTD 12 9/3/2019
V. Hydrogen Sulfide
S -Pad is considered an 1-12S site. Recent HqS data from the Dad is as follows -
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling
CONSULT THE S -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
S-202 PTD 13 9/3/2019
Well Name
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
S -40A
56 ppm
12/15/16
#2 Closest SHL Well H2S Level
S -17C
19 ppm
03/29/15
#1 Closest BHL Well H2S Level
S-201
180 ppm
03/09/12
#2 Closest BHL Well H2S Level
S-200
10 ppm
08/14/00
Max Recorded H2S on Pad/Facility
S -27B
140 ppm
01/10/12
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• S-17: Isolated with deep plug and Shut-in at surface during surface interval drilling
• S-40: Isolated with deep plug and Shut-in at surface during surface interval drilling
CONSULT THE S -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
S-202 PTD 13 9/3/2019
WELLHEAD =
ACTUATOR =
KB.--aEv =---- --
BF._aEv =
Mf3x Angle =
----
Datum ND—
Datum TV D =
PROPOSED S-202
REV 1 (L1, L2, L3, & L4)
20" CONDUCTOR
10-3/4" CSG, 45-5#, L-80, D = 9.950"
Minimum ID: " @ '
SAFETY NOTES:
4-1/2" HES X NIH'. D = 3.813"
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
GATE
4
3
2
1
7-518" X 4-1l2" BKR PRM PKR, D= 3-875"
4-1/2" HES X NIP, D = 1813-
4-1/2" HES X NIP, D = 3-813"
6660` I7-518" X 5-1/2" BKR ZXP LTPffEBK, D = 4-970"
19' SEAL BORE FXTFNSION, ID = 4-75"
4-1/2" TBG, 12-6#, L-80, .0152 bpf, D = 3-958" — 4-1/2" FLUTTED WLEG, D = 3.958"
5-112" X 4-112" XO. D = 3-958"
BAKER HOOK HANGER ASSY 5810'
3.68$" - ' - - -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ L5(OA)LEM WNDOW
w / L2 SEALING LEM, D = _°
L4 (OA)
7-5/8" RA T AEJ— OPENING WIDTH = 3.33"
7-5/8" X 5-1/2" BKR ZXP LTPf TIEBK, ID = 4-970"
LEM #2 LOWER SEAL ASSY, D = 3-90" —� 19-1/2' SEAL BORE EXTENSION
LBAKER HOOK HANGER ASSY 6()25-
w / L1 SEALING LEM, D
7-5/8" RA T AE]—
LEM
G —LEM #1 LOWER SEAL ASSY, D = 3.88" —
7-5/8" CSG, 29.7#, L-80, ID = 6.875"—j_674V_�-All
I
I
I
I
I
I
I
I
I
I
IS -202
1(OBd)
4-1/2" SLTD LNR, 12-6#, L-80, 13000'
0152 bpf, ID = 3-958"
5-112" X 4-1/2" XO, D = 3.910"
- - - - - - - - - - - - - - - - - - - - L4(OBa)LEM WINDOW
L3 (OBa)
- - - - - - - - - - - - - - - - - - - - -' OPENING WIDTH = 3.33„
7-5/8" X 5-1/2" BKR ZXP LTTa IEBK, D = "
19' SEAL BORE EXTENSION, ID
I
I
-----------------------
Ll (OBb)
1a. -----------
ZA,
'K� j 7297' I�6" FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
`----------------------
L2 (OBC)
6977° 6" FLOWTHRU ALUMINUM BELET LNR
(BEHIND SLOTTED LINERI
�f ••
m ♦•
POLARIS HILT
WELL: S-202, L1, L2, L3, L4, & L5
PERIVIT No:
API Na:
SEC . T 2N. R E ' FSL & FWL
BP Exploration (Alaska)
TOP OF ROTARY TABLE C/L WELL
BOTTOM OF ROTARY BEAM
i
Is
it
CHOKE LINE:
3-1/8' SM FLANGED MANUAL GATE VALVE
3-1/8' SM FLANGED ITYDRAULIC GATE VALVE
3-1/8' SM FLEX HOSE
CELLAR AND WELL HEAD CONFIGURATION
ARE FOR REFERENCE ONLY k ARE
DEPENDENT ON OPERATOR'S
REQUIREMENTS
NIPPLE UP:
SPACER SPOOL
13 5/8' SM FLANGE TOP
13 5/8' SM FLANGED BOTTOM
SPACER SPOOL
13 5/8' SM FLANGE TOP
13 5/8' SM RANGED BOTTOM
DOUBLE STUDDED ADAPTER
13 5/8' SM RANGED TOP
11' 5M FLAWED BOTTOM
CASING SPOOL ASSEMBLY
11' SM FLANGED TOP
11' SM FLANGED BOTTOM
CASING HEAD ASSEMBLY
11' SM FLANGED TOP
FLOWBOX BELL NIPPLE:
32' D61. PIPE SEAL WELDED TO THE BOTTOM Of THE FLOWBOX
30-3/8'
INNER DIA. TRIPLE INFLATABLE RUBBER SEAL WELL
BELL NIPPLE-
15'
IPPLE15' DN UPPER, 18' DM LOWER
3' CASING FILL OUTLET (QTY OF 2)
13 5/8' SM BOTTOM LTE FIANCE
18' KEMPER SEAL -0 -GRIP
(1 EA.) 3' DIA. STD. OUTLET
(1 EA.) 2' Dol STD. OUTLET
DUTCH LDCK DOWN FLANGE
ANNULAR BOP:
13-5/8' SM SHAFFER LXT
13-5/8' SM STUDDED TOP
13-5/8' SM FLANGED BOTTOM
RAM TYPE BOP:
13 5/8' SM NOV 8012 DOUBLE BOP
13 5/8' SM STUDED TOP
13 5/8' SM FLANGED BOTTOM
W/ 3-1/2' MANUAL LOCKS W/ 11' BOOSTER
DRILLING CROSS:
13 5/8' SM STUDDED TOP
13 5/8' 5M FLANGED BOTTOM
W (2) 3 1/8' SM SIDE OUTLETS
KILL UNE:
2-1/16' SM FLEX HOSE
2-1/16' SM X 3-1/8' SM D.SA
3-1/8' SM FLANGED MANUAL GATE VALVE
3-1/8' SM FLANGED HYDRAULIC GATE VALVE
RAM TYPE BOP:
13 5/8' SM NOV 6012 SINGLE BOP
13 5/8' SM STUDDED TOP
13 5/8' SM FLANGED BOTTOM
6012 BOP STACK (DRAFT 8. 3.1? L.C.)
wa Ke• .e«>i. y
AYrw a Nrv.rp aaa^r+.na:ww
;t n w w. ♦. y`a x u�ya•+p.ap iat N.n.li
eysety dvW aup
,.., wc; arra` •........wa rff: owa w a
Ngi«r 0.q
lith: r.+s+wY W'i« fA'N]w
.�+a+4 � •wY a .erM V
.ax�Y..Yae rr wsYraA V
Bridge Crane Permanent
Bracing
Rig Drill and Saddle
Module Rii Ji
der
(Sub Base) Rigs 12.1' Ill"O 19,8'-- 6.0
BOP I Knife Valve
Deck 20" diverter
I
iFlow °T" 4Spacer 4' Spacer 20 Spacer 3' Spacer Spool
Spool Spool Spool
I u
t, ._.. _t._._......., 1' Spacer
I
S0001
i
i
I
I
Dummy
Well
House
LO 20" Riser
N
.7 Conductor r
18.4'f
26.0'
39.0' 11.0'
50.0'
Notes Diverter Plan for Well L5-03
1 - This diverter vent line configuration is identical in length to previous designs.
2 - There is no change in distances to ignition sources. All dimensions remain the same.
I I
■15 0
I I
E 137
0'
E SS18
E 128i
■ 134; _ N _ PLANT
I� I
016 f
. 126i
2171 S PAD
j
0218i j MON. S-1
I �I
I I�
I OQF. I
q8 101
135
E17
5-202
040
I I
I I
I I
I I
I � I
I I
�18
I I I
S—PAD
GRAPHIC SCALE
0 50 100 200
( IN FEET )
1 Inch = 100 ft.
NOTES:
LEGEND:
AS—BUILT CONDUCTOR
m EXISTING CONDUCTOR
OPERATOR MONUMENT
1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. (EPSG:26734)
2. BASIS OF VERTICAL CONTROL IS S—PAD MONUMENT S-4, REFERENCE 2018 WELL
BORE SUBSIDENCE STUDY HOLDING MON. S-4 (ELEV. 38.647
3. VERTICAL DATUM IS BPXA M.S.L.
4. GEODETIC POSITIONS ARE NA027. (EPSC:4267)
5. BEARINGS AND DISTANCES SHOWN ARE ALASKA STATE PLANE GRID
5. S—PAD AVERAGE SCALE FACTOR IS: 0.9999165.
6. DATE OF SURVEY: JULY 17, 2019.
7. REFERENCE FIELD BOOK: NS19-17 PP. 22-27.
8. COMPUTED RELATIVE ACCURACY (THIRD ORDER):
BASELINE DISTANCE 1:15,502
BASELINE AZIMUTH: N/A
ALLOWABLE VERTICAL CLOSURE ±0.01'; FOUND: 0.001'
9. NAD27 COORDINATES DERIVED USING TRIMBLE BUSINESS CENTER—HCE. VER 3.92.
THS PploiwT
VICINITY MAP
NTS
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS AS—BUILT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF JULY 17, 2019.
BASIS OF COORDINATES:
HELD COORDINATES OF RECORD
S—PAD MONUMENT S-1
Y= 5,979,431.54 N— 1,400.72
X= 619,321.07 E= 1,423.66
NAD27, ASP, ZONE 4 S—PAD PLANT
DESCRIPTION: OPERATOR MONUMENT, PUNCH
MARK ON EAST END OF PIPE SUPPORT FOR
RELIEF LINE
—W—
I
LOCATED WITHIN PROTRACTED SEC. 35, T. 12 N., R. 12 E., UMIAT MERIDIAN, ALASKA
WELL
NO.
A.S.P.
COORDINATES
PLANT
COORDINATES
GEODETIC
POSITION(DMS)
GEODETIC
POSITION(D.DD)
SECTION
OFFSETS
PAD
ELEVATION1
CELLAR
BOX EL
BASE
FLANGE EL.
S-202
Y= 5,979,262.56
X= 618,885.12
N= 964.67
E= 1,592.49
70'21'07.196"
149'02'04.867"
70.3519989'
149.0346853'
3,060' FSL
4,567' FEL
38.1'
37.9'
N/A
�
e
DRAW
DRAPES
Obp
CHECKED. DRAPER
UA
7/22/19a
AMMG
FR
FR81a vros 02
WOA S—PAD
AS—BUILT CONDUCTOR LOCATION
WELL S-202
S"��
1 OF 1
COAD
AECC582
_
IL FSKIM
lOJANCNOtAtr KAW 9503
(>JD'7) n*-=
r—too'
DO ISl k FOR 96'ORMAIiON JJ
JO. DATE REvi90n �. anc
69.8
I
I
22.
tEWS
) 120 GV
'ws
IZO GV
REF: 00120M 1078965
nni�nuinoion..
-5000 COMPLETION
wx
WITH I -WIRE
MAWRT
.
FDR 41 /�-5000 x -MAS Tp.EE
��ox2
2D X 75/8 X 4V2
wra+w m-iz-o� w- 1
r.wnrw_ 0-11-w DD12DM1078965-2
�I
Ln
LD
00
0
N
0
0
0 by
North America - ALASKA - BP
PBU
S
S-202
PLAN S-2021-4 OA
Plan: S-2021-4 WP08 OA
BP Well Plan Survey Report
06 November, 2018
-0446
S, TR -12-12
BP
by
Map
BP Well Plan Survey Report
0.00 usft
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well:
S-202
North Reference:
True
Wellbore:
PLAN S-2021-4 OA
Survey Calculation Method:
Minimum Curvature
Design:
S-20214 WP08 OA
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27OGP-Usa AK [4267`15864] Using Well Reference Point
Map Zone: NAD27 ` OGP-Usa AK / Alaska zone 4 [26734`1586, Using geodetic scale factor
Site
S, TR -12-12
Site Position:
From:
Map
Position Uncertainty:
0.00 usft
Well
S-202
Well Position
+NI -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
PLAN S-2021-4 OA
Magnetics
Model Name Sample Date
BGGM2018 2/1/2019
Design
S -202L4 WPOS OA
Audit Notes:
Version:
Phase:
Vertical Section:
Depth From (TVD)
(usft)
40.00
Northing: 5,980,854.540 usft
Easting: 617,919.920 usft
Slot Radius: 0.000 in
Northing: 5,979,262.300 usft
Easting: 618,885.010 usft
Wellhead Elevation: 38.28 usft
Declination
(°)
16.93
PLAN
+NI -S
(usft)
0.00
Latitude:
Longitude:
Grid Convergence:
Dip Angle Field Strength
(°) (nT)
80.94 57,437
Tie On Depth: 5,810.00
+E/ -W Direction
(usft) (°)
0.00 341.16
Latitude:
Longitude:
Ground Level:
70° 21'23.002 N
149° 2'32.343 W
0.90 °
70' 21'7.194 N
149° 2'4.870 W
38.28 usft
11/6/2018 1:23:04PM Page 2 COMPASS 5000.1 Build 8 1 D
by
BP
BP Well Plan Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-2021-4 OA
Survey Calculation
Method:
Minimum Curvature
Design: S-2021-4 WP08 OA
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Tool Program Date 11/6/2018
From To
(usft) (usft) Survey (Wellbore)
Tool Name
Description
40.00 2,000.00 S -202L1 WP08 OBB (PLAN S-2021-1 OBB
GYD-GC-SS
Gyrodata gyro single shots
2,000.00 3,130.00 S-20211 WP08 OBB (PLAN S-2021-1 OBB
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
3,130.00 5,810.00 S-2021-1 WP08 OBB (PLAN 5-2021-1 OBB
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
5,810.00 13,000.00 S-2021-4 WP08 OA (PLAN
S-2021-4 OA)
MWD
MWD - Standard
5,810.00 13,000.00 S-2021-4 WP08 OA (PLAN
S-2021-4 OA)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
Planned Survey
MD Inc Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft) (°) (°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
5,810.00 66.00 324.00
5,063.02
4,984.74
-154.09
-516.99
5,979,100.042
618,370.573
0.00
Start Build 16.00 - KOP
5,822.00 67.92 324.00
5,067.71
4,989.43
-145.15
-523.48
5,979,108.871
618,363.943
16.00
Start 12.00 hold at 5822.00 MD
5,834.00 67.92 324.00
5,072.23
4,993.95
-136.16
-530.02
5,979,117.761
618,357.265
0.00
Start US 10.00 TFO 20.00
5,900.00 74.14 326.34
5,093.67
5,015.39
-84.94
-565.62
5,979,168.404
618,320.853
10.00
6,000.00 83.60 329.64
5,112.96
5,034.68
-1.82
-617.52
5,979,250.683
618,267.645
10.00
6,099.12 93.00 332.79
5,115.90
5,037.62
84.91
-665.16
5,979,336.644
618,218.640
10.00
Start 119.88 hold at 6099.12 MD
6,100.00 93.00 332.79
5,115.85
5,037.57
85.69
-665.56
5,979,337.416
618,218.227
0.00
6,200.00 93.00 332.79
5,110.62
5,032.34
174.51
-711.22
5,979,425.488
618,171.172
0.00
6,219.00 93.00 332.79
5,109.63
5,031.35
191.39
-719.90
5,979,442.225
618,162.229
0.00
Start DLS 2.00 TFO -90.00
6,300.00 93.00 331.17
5,105.39
5,027.11
262.79
-757.89
5,979,513.011
618,123.111
2.00
6,399.00 92.99 329.19
5,100.21
5,021.93
348.56
-807.05
5,979,597.986
618,072.599
2.00
Start 200.00 hold at 6399.00 MD
6,400.00 92.99 329.19
5,100.16
5,021.88
349.42
-807.56
5,979,598.833
618,072.076
0.00
6,500.00 92.99 329.19
5,094.94
5,016.66
435.19
-858.71
5,979,683.772
618,019.575
0.00
TFace
l°I
0.00
0.00
0.00
20.00
19.24
18.60
0.00
0.00
0.00
-90.00
-90.08
0.00
0.00
11/6/2018 1:23:04PM Page 3 COMPASS 5000.1 Build 81D
BP
j by
BP Well
Plan Survey Report
Company: North America -
ALASKA
- BP
Local Co-ordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-2021-4
OA
Survey Calculation
Method:
Minimum Curvature
Design: S-2021-4 WP08
OA
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
6,599.00
92.99
329.19
5,089.77
5,011.49
520.10
-909.35
5,979,767.865
617,967.598
0.00
0.00
Start Drop -1.50
6,600.00
92.98
329.19
5,089.71
5,011.43
520.96
-909.86
5,979,768.712
617,967.075
1.50
-180.00
6,699.00
91.49
329.19
5,085.85
5,007.57
605.92
-960.53
5,979,852.853
617,915.067
1.50
180.00
Start 450.00 hold at 6699.00 MD
6,700.00
91.49
329.19
5,085.82
5,007.54
606.78
-961.04
5,979,853.701
617,914.544
0.00
0.00
6,800.00
91.49
329.19
5,083.22
5,004.94
692.63
-1,012.24
5,979,938.727
617,861.989
0.00
0.00
6,900.00
91.49
329.19
5,080.61
5,002.33
778.49
-1,063.45
5,980,023.754
617,809.435
0.00
0.00
7,000.00
91.49
329.19
5,078.00
4,999.72
864.35
-1,114.65
5,980,108.781
617,756.880
0.00
0.00
7,100.00
91.49
329.19
5,075.39
4,997.11
950.20
-1,165.85
5,980,193.807
617,704.326
0.00
0.00
7,149.00
91.49
329.19
5,074.12
4,995.84
992.28
-1,190.95
5,980,235.474
617,678.572
0.00
0.00
Start DLS 2.00 TFO -99.50
7,200.00
91.33
328.18
5,072.86
4,994.58
1,035.83
-1,217.44
5,980,278.598
617,651.391
2.00
-99.50
7,300.00
90.99
326.21
5,070.84
4,992.56
1,119.86
-1,271.60
5,980,361.753
617,595.907
2.00
-99.52
7,400.00
90.66
324.24
5,069.39
4,991.11
1,201.99
-1,328.63
5,980,442.957
617,537.588
2.00
-99.56
7,404.00
90.65
324.16
5,069.35
4,991.07
1,205.24
-1,330.97
5,980,446.167
617,535.195
2.00
-99.59
Start 1130.00 hold at 7404.00 MD
7,500.00
90.65
324.16
5,068.26
4,989.98
1,283.05
-1,387.18
5,980,523.072
617,477.766
0.00
0.00
7,600.00
90.65
324.16
5,067.13
4,988.85
1,364.11
-1,445.73
5,980,603.186
617,417.942
0.00
0.00
7,700.00
90.65
324.16
5,066.00
4,987.72
1,445.17
-1,504.28
5,980,683.299
617,358.119
0.00
0.00
7,800.00
90.65
324.16
5,064.87
4,986.59
1,526.23
-1,562.83
5,980,763.413
617,298.295
0.00
0.00
7,900.00
90.65
324.16
5,063.74
4,985.46
1,607.29
-1,621.38
5,980,843.526
617,238.471
0.00
0.00
8,000.00
90.65
324.16
5,062.61
4,984.33
1,688.35
-1,679.93
5,980,923.639
617,178.647
0.00
0.00
8,100.00
90.65
324.16
5,061.48
4,983.20
1,769.41
-1,738.48
5,981,003.753
617,118.823
0.00
0.00
8,200.00
90.65
324.16
5,060.35
4,982.07
1,850.46
-1,797.03
5,981,083.866
617,058.999
0.00
0.00
8,300.00
90.65
324.16
5,059.22
4,980.94
1,931.52
-1,855.58
5,981,163.979
616,999.176
0.00
0.00
8,400.00
90.65
324.16
5,058.09
4,979.81
2,012.58
-1,914.13
5,981,244.093
616,939.352
0.00
0.00
11/6/2018 1:23:04PM
Page 4
COMPASS 5000.1 Build 81D
TFace
(°)
0.00
0.00
86.75
86.77
86.79
86.82
86.86
86.90
86.94
86.99
96.50
96.53
96.57
96.60
96.63
96.64
96.65
96.65
96.64
96.63
0.00
0.00
0.00
0.00
11/6/2018 1:23:04PM Page 5 COMPASS 5000.1 Build 81D
BP
by
BP Well Plan Survey Report
Company: North America
- ALASKA - BP
Local Co-ordinate
Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-2021-4
OA
Survey Calculation Method:
Minimum Curvature
Design: S-2021-4 WP08
OA
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
8,500.00
90.65
324.16
5,056.96
4,978.68
2,093.64
-1,972.68
5,981,324.206
616,879.528
0.00
8,534.00
90.65
324.16
5,056.57
4,978.29
2,121.21
-1,992.59
5,981,351.448
616,859.186
0.00
Start DLS 2.00 TFO 86.75
8,600.00
90.72
325.48
5,055.79
4,977.51
2,175.14
-2,030.61
5,981,404.769
616,820.316
2.00
8,700.00
90.83
327.47
5,054.43
4,976.15
2,258.49
-2,085.83
5,981,487.228
616,763.784
2.00
8,800.00
90.95
329.47
5,052.87
4,974.59
2,343.72
-2,138.11
5,981,571.605
616,710.161
2.00
8,900.00
91.06
331.47
5,051.13
4,972.85
2,430.71
-2,187.39
5,981,657.797
616,659.512
2.00
9,000.00
91.17
333.47
5,049.19
4,970.91
2,519.36
-2,233.61
5,981,745.698
616,611.901
2.00
9,100.00
91.27
335.46
5,047.06
4,968.78
2,609.57
-2,276.70
5,981,835.202
616,567.383
2.00
9,200.00
91.38
337.46
5,044.75
4,966.47
2,701.22
-2,316.63
5,981,926.200
616,526.015
2.00
9,234.00
91.41
338.14
5,043.92
4,965.64
2,732.69
-2,329.47
5,981,957.463
616,512.675
2.00
Start DLS 2.00 TFO 96.50
9,300.00
91.26
339.45
5,042.37
4,964.09
2,794.20
-2,353.33
5,982,018.582
616,487.841
2.00
9,400.00
91.04
341.44
5,040.37
4,962.09
2,888.41
-2,386.79
5,982,112.240
616,452.892
2.00
9,500.00
90.81
343.43
5,038.76
4,960.48
2,983.73
-2,416.97
5,982,207.061
616,421.209
2.00
9,600.00
90.58
345.41
5,037.55
4,959.27
3,080.05
-2,443.82
5,982,302.928
616,392.832
2.00
9,700.00
90.35
347.40
5,036.75
4,958.47
3,177.24
-2,467.33
5,982,399.726
616,367.794
2.00
9,800.00
90.11
349.39
5,036.34
4,958.06
3,275.19
-2,487.44
5,982,497.335
616,346.126
2.00
9,900.00
89.88
351.37
5,036.35
4,958.07
3,373.78
-2,504.15
5,982,595.638
616,327.855
2.00
10,000.00
89.65
353.36
5,036.76
4,958.48
3,472.88
-2,517.44
5,982,694.515
616,313.002
2.00
10,100.00
89.42
355.35
5,037.57
4,959.29
3,572.39
-2,527.28
5,982,793.844
616,301.586
2.00
10,154.00
89.30
356.42
5,038.17
4,959.89
3,626.25
-2,531.15
5,982,847.631
616,296.856
2.00
Start 980.00 hold at 10154.00 MD
10,200.00
89.30
356.42
5,038.74
4,960.46
3,672.15
-2,534.03
5,982,893.479
616,293.256
0.00
10,300.00
89.30
356.42
5,039.97
4,961.69
3,771.95
-2,540.27
5,982,993.156
616,285.429
0.00
10,400.00
89.30
356.42
5,041.20
4,962.92
3,871.75
-2,546.52
5,983,092.834
616,277.602
0.00
10,500.00
89.30
356.42
5,042.43
4,964.15
3,971.54
-2,552.76
5,983,192.511
616,269.775
0.00
TFace
(°)
0.00
0.00
86.75
86.77
86.79
86.82
86.86
86.90
86.94
86.99
96.50
96.53
96.57
96.60
96.63
96.64
96.65
96.65
96.64
96.63
0.00
0.00
0.00
0.00
11/6/2018 1:23:04PM Page 5 COMPASS 5000.1 Build 81D
BP
by
BP Well
Plan Survey Report
Company: North America
- ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project: PBU
TVD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Site: S
MD Reference:
PLAN KB @ 78.28usft
(Original Well Elev)
Well: S-202
North Reference:
True
Wellbore: PLAN S-202L4
OA
Survey Calculation
Method:
Minimum Curvature
Design: S-2021-4 WP08
OA
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft) (°)
10,600.00
89.30
356.42
5,043.66
4,965.38
4,071.34
-2,559.01
5,983,292.188
616,261.948
0.00
0.00
10,700.00
89.30
356.42
5,044.89
4,966.61
4,171.14
-2,565.25
5,983,391.865
616,254.121
0.00
0.00
10,800.00
89.30
356.42
5,046.12
4,967.84
4,270.94
-2,571.50
5,983,491.542
616,246.294
0.00
0.00
10,900.00
89.30
356.42
5,047.35
4,969.07
4,370.73
-2,577.74
5,983,591.220
616,238.467
0.00
0.00
11,000.00
89.30
356.42
5,048.58
4,970.30
4,470.53
-2,583.99
5,983,690.897
616,230.640
0.00
0.00
11,100.00
89.30
356.42
5,049.81
4,971.53
4,570.33
-2,590.23
5,983,790.574
616,222.813
0.00
0.00
11,134.00
89.30
356.42
5,050.23
4,971.95
4,604.26
-2,592.35
5,983,824.468
616,220.152
0.00
0.00
Start DLS 2.00 TFO 93.00
11,200.00
89.23
357.74
5,051.08
4,972.80
4,670.17
-2,595.72
5,983,890.304
616,215.743
2.00
93.00
11,300.00
89.12
359.74
5,052.52
4,974.24
4,770.13
-2,597.92
5,983,990.209
616,211.953
2.00
92.98
11,400.00
89.02
1.73
5,054.14
4,975.86
4,870.10
-2,596.64
5,984,090.182
616,211.647
2.00
92.95
11,500.00
88.92
3.73
5,055.94
4,977.66
4,969.97
-2,591.88
5,984,190.101
616,214.826
2.00
92.92
11,600.00
88.82
5.73
5,057.91
4,979.63
5,069.60
-2,583.63
5,984,289.846
616,221.487
2.00
92.89
11,700.00
88.72
7.73
5,060.06
4,981.78
5,168.88
-2,571.92
5,984,389.295
616,231.620
2.00
92.85
11,800.00
88.62
9.72
5,062.38
4,984.10
5,267.70
-2,556.76
5,984,488.326
616,245.214
2.00
92.80
11,900.00
88.53
11.72
5,064.87
4,986.59
5,365.91
-2,538.16
5,984,586.818
616,262.253
2.00
92.76
12,000.00
88.43
13.72
5,067.52
4,989.24
5,463.42
-2,516.14
5,984,684.653
616,282.715
2.00
92.71
12,100.00
88.34
15.72
5,070.33
4,992.05
5,560.09
-2,490.74
5,984,781.710
616,306.575
2.00
92.65
12,200.00
88.25
17.72
5,073.30
4,995.02
5,655.82
-2,461.99
5,984,877.872
616,333.805
2.00
92.60
12,300.00
88.17
19.72
5,076.43
4,998.15
5,750.48
-2,429.92
5,984,973.020
616,364.371
2.00
92.54
12,334.00
88.14
20.40
5,077.52
4,999.24
5,782.40
-2,418.26
5,985,005.123
616,375.518
2.00
92.48
Start 666.00 hold at 12334.00 MD
12,400.00
88.14
20.40
5,079.67
5,001.39
5,844.23
-2,395.27
5,985,067.300
616,397.522
0.00
0.00
12,500.00
88.14
20.40
5,082.92
5,004.64
5,937.91
-2,360.43
5,985,161.513
616,430.864
0.00
0.00
12,600.00
88.14
20.40
5,086.17
5,007.89
6,031.59
-2,325.60
5,985,255.726
616,464.206
0.00
0.00
12,700.00
88.14
20.40
5,089.43
5,011.15
6,125.27
-2,290.76
5,985,349.939
616,497.547
0.00
0.00
12,800.00
88.14
20.40
5,092.68
5,014.40
6,218.95
-2,255.93
5,985,444.152
616,530.889
0.00
0.00
11/6/2018 1:23.04PM
Page 6
COMPASS 5000.1 Build BID
0 by
Company: North America - ALASKA - BP
Project: PBU
Site: S
Well: 5-202
Wellbore: PLAN S-2021-4 OA
Design: S-2021-4 WP08 OA
Planned Survey
MD Inc
(usft) (°)
12,900.00 88.14
13,000.00 88.14
TD at 13000.00 - 4 1/2"
Casing Points
BP
BP Well Plan Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Azi TVD
TVDSS
N/S ENV
Northing
Easting DLeg TFace
(°) (usft)
(usft)
(usft) (usft)
(usft)
(usft) (°/100usft) (°)
20.40 5,095.93
5,017.65
6,312.63 -2,221.09
5,985,538.365
616,564.231 0.00 0.00
20.40 5,099.18
5,020.90
6,406.31 -2,186.26
5,985,632.578
616,597.572 0.00 0.00
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft)
Name
(in)
(in)
13,000.00
5,099.18
41/2"
4.500
6.125
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
5,810.00
5,063.02
-154.09
-516.99
Start Build 16.00 - KOP
5,822.00
5,067.71
-145.15
-523.48
Start 12.00 hold at 5822.00 MD
5,834.00
5,072.23
-136.16
-530.02
Start DLS 10.00 TFO 20.00
6,099.12
5,115.90
84.91
-665.16
Start 119.88 hold at 6099.12 MD
6,219.00
5,109.63
191.39
-719.90
Start DLS 2.00 TFO -90.00
6,399.00
5,100.21
348.56
-807.05
Start 200.00 hold at 6399.00 MD
6,599.00
5,089.77
520.10
-909.35
Start Drop -1.50
6,699.00
5,085.85
605.92
-960.53
Start 450.00 hold at 6699.00 MD
7,149.00
5,074.12
992.28
-1,190.95
Start DLS 2.00 TFO -99.50
7,404.00
5,069.35
1,205.24
-1,330.97
Start 1130.00 hold at 7404.00 MD
8,534.00
5,056.57
2,121.21
-1,992.59
Start DLS 2.00 TFO 86.75
9,234.00
5,043.92
2,732.69
-2,329.47
Start DLS 2.00 TFO 96.50
10,154.00
5,038.17
3,626.25
-2,531.15
Start 980.00 hold at 10154.00 MD
11,134.00
5,050.23
4,604.26
-2,592.35
Start DLS 2.00 TFO 93.00
12,334.00
5,077.52
5,782.40
-2,418.26
Start 666.00 hold at 12334.00 MD
13,000.00
5,099.18
6,406.31
-2,186.26
TD at 13000.00
11/6/2018 1.23:04PM
Page 7
COMPASS 5000.1 Build 81D
North America - ALASKA - BP
PBU
S
S-202
PLAN S -202L4 OA
S -202L4 WP08 OA
Anticollision Summary Report
06 November, 2018
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
O.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
PLAN S-2021_4 OA
Reference Design:
S -202L4 WP08 OA
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference S-2021_4 WP08 OA
Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria WARNING: There is hidden tight data in this project
Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA
Depth Range: 5,810.00 to 13,000.00usft Scan Method: Tray. Cylinder North
Results Limited by: Maximum center -center distance of 1,496.00usft Error Surface: Elliptical Conic
Survey Tool Program
From
(usft)
40.00
2,000.00
3,130.00
5,810.00
5,810.00
Date 11/6/2018
To
(usft) Survey (Wellbore) Tool Name Description
2,000.00 S-2021_1 WP08 OBB (PLAN S-2021_1 OBB GYD-GC-SS Gyrodata gyro single shots
3,130.00 S-2021_1 WP08 OBB (PLAN S-2021_1 OBB MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
5,810.00 5-2021_1 WP08 OBB (PLAN S-2021_1 OBB MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
13,000.00 5-2021_4 WP08 OA (PLAN 5-202L4 OA) MWD MWD - Standard
13,000.00 S-2021_4 WPOB OA (PLAN S-2021_4 OA) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
11/6/2018 10:05:11AM Page 2 of COMPASS 5000.1 Build 81D
BP
0 by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S-2021-4 OA
Database:
EDM R5K-Alaska PROD -ANCP1
Reference Design:
S-2021-4 WP08 OA
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
S
Plan Kup 13-100 Spurs s -slot 05 v3.0 - Plan Kup 13
Out of range
Plan Kup S-xmc Coventry s -slot 01 v3.0 - Plan Kup
Out of range
S-01 - S-01 - S-01
7,001.96
5,450.00
292.62
216.12
88.35
Pass - Major Risk
S-01 - S -01A- S -01A
7,001.96
5,450.00
292.62
216.12
88.35
Pass - Major Risk
S-01 - S-01 B - S-01 B
7,000.20
5,450.00
291.66
215.75
88.43
Pass - Major Risk
S-01 - S-01 C - S-01 C
7,000.20
5,450.00
291.66
215.75
88.43
Pass - Major Risk
S-03 - S-03 - S-03
8,689.28
6,300.00
313.24
244.04
89.09
Pass - Major Risk
S-09 - S-09 - S-09
Out of range
S-102 - S-102 - S-102
11,910.00
7,575.00
821.81
384.83
540.83
Pass - Major Risk
S-102 - S-1021-1 - S-1021-1
11,910.00
7,575.00
821.81
384.09
541.32
Pass - Major Risk
S-102 - S-1021-1 PBI - S-1021-1 PBI
11,910.00
7,575.00
821.81
384.09
541.31
Pass - Major Risk
S-102 - S-102PB1 -S-102P81
11,910.00
7,575.00
821.81
385.39
540.28
Pass - Major Risk
S-103 - S-103 - S-103
11,548.25
7,175.00
484.79
377.99
152.47
Pass - Major Risk
S-104 - S-104 - S-104
12,856.06
7,600.00
1,444.59
364.27
1,120.39
Pass - Major Risk
S-111 - S-111 - S-111
12,989.35
6,925.00
1,453.92
339.52
1,150.65
Pass - Major Risk
S-111-S-111PB1-S-111PB1
12,989.35
6,925.00
1,453.92
340.23
1,149.94
Pass - Major Risk
S-111 - S-111 PB2 - S -111 P82
12,989.35
6,925.00
1,453.92
339.52
1,150.65
Pass - Major Risk
S-115 - S-115 - S-115
8,213.44
5,600.00
421.47
182.37
240.14
Pass - Major Risk
S-118 - S-118 - S-118
6,318.88
5,375.00
136.48
78.16
60.39
Pass - Major Risk
S-122 - S-122 - S-122
12,939.96
8,200.00
932.94
341.22
663.99
Pass - Major Risk
S-122 - S-122PB1 - S-122PB1
12,939.96
8,200.00
932.94
341.36
663.85
Pass - Major Risk
S-122 - S-122PB2 - S-122PI32
12,939.96
8,200.00
932.94
341.23
663.98
Pass - Major Risk
S-122 - S-122PB3 - S -122P83
12,939.96
8,200.00
932.94
341.22
663.99
Pass - Major Risk
S-126 - S-126 - S-126
Out of range
S-128 - S-128 - S-128
Out of range
S-128 - S -128P82 - S -128P62
Out of range
S-13 - S-1 3A - S-1 3A
Out of range
S-134 - S-134 - S-134
6,198 39
5,100.00
630.15
74.23
565.61
Pass - Major Risk
S-135 - S-135 - S-135
Out of range
S-135 - S-135PB2 - S-135PB2
Out of range
S-15 - S-15 - S-15
6,401.82
4,575.00
1,337.63
95.23
1,250.36
Pass - Major Risk
S-15 - S-15PB1 - S-15PB1
6,401.82
4,575.00
1,337.63
95.23
1,250.36
Pass - Major Risk
S-16 - S-16 - S-16
6,345.01
4,775.00
1,085.40
115.77
978.10
Pass - Major Risk
S-17 - S-17 - S-17
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S -17A - S -17A
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S-17AL1 - S-17AL1
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S-17AL1 PB1 - S-17ALl PB1
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S-17APB1 - S-17APB1
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S -17B - S -17B
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S -17C - S -17C
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S-17CPB1 - S-17CP81
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-17 - S-17CPB2 - S-17CPB2
5,813.15
5,125.00
346.26
98.18
270.08
Pass - Major Risk
S-200 - S-200 - S-200
8,859.16
5,925.00
661.87
274.08
394.60
Pass - Major Risk
S-200 - S -200A - S -200A
10,854.38
7,475.00
519.52
316.23
292.18
Pass - Major Risk
S-200 - S-200PB1 - S-200PB1
8,373.96
5,725.00
759.93
245.50
519.37
Pass - Major Risk
S-201 - S-201 - S-201
11,130.41
6,825.00
1,134.77
353.01
804.12
Pass - Major Risk
S-202 - PLAN S-202 OBD - S-202 WP08 OBD
6,128.88
6,150.00
74.83
1.24
74.83
Pass - NOERRORS
S-202 - PLAN S-2021-1 OBB - S-2021-1 WP08 OB
6,128.88
6,150.00
74.83
1.24
74.83
Pass - NOERRORS
S-202 - PLAN S-2021-2 OBC - S-2021-2 WP08 OB
6,128.88
6,150.00
74.83
1.24
74.83
Pass - NOERRORS
S-202 - PLAN S-2021-3 OBA - S-2021-3 WP08 OBA
6,110.00
6,125.00
53.72
1.17
53.72
Pass - NOERRORS
S-213 - S-213 - S-213
6,788.67
5,225.00
875.08
96.45
791.02
Pass - Major Risk
S-213 - S -213A - S -213A
6,677.07
5,225.00
766.40
97.85
683.38
Pass - Major Risk
S-213 - S-213AL1 - S-213ALl
6,677.07
5,225.00
766.40
97.85
683.38
Pass - Major Risk
11/6/2018 10:05:11AM Page 3 of 5 COMPASS 5000.1 Build 81D
BP
Lip Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
TVD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
0.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S-20214 OA
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-2021-4 WP08 OA
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
S
S-213 - S-213ALl-01 - S-213AL1-01
6,677.07
5,225.00
766.40
97.85
683.38
Pass - Major Risk
S-213 - S-213AL2 - S-213AL2
6,677.07
5,225.00
766.40
97.85
683.38
Pass - Major Risk
S-213 - S-213AL3 - S-213AL3
6,677.07
5,225.00
766.40
97.85
683.38
Pass - Major Risk
S-22 - S-22 - S-22
7,045.96
5,450.00
563.78
134.73
436.68
Pass - Major Risk
S-22 - S -22A - S -22A
7,045.96
5,450.00
563.78
134.73
436.68
Pass - Major Risk
S-22 - S -22B - S -22B
7,032.86
5,425.00
564.01
133.11
437.40
Pass - Major Risk
S-24 - S -24A - S -24A
7,721.83
5,800.00
859.60
209.70
653.80
Pass - Major Risk
S-24 - S -24B - S -24B
7,721.83
5,800.00
859.60
209.76
653.82
Pass - Major Risk
S-28 - S-28 - S-28
5,810.00
5,825.00
436.99
67.81
374.03
Pass - Major Risk
S-28 - S -28A - S -28A
5,810.00
5,825.00
436.99
87.81
374.03
Pass - Major Risk
S-28 - S -28B - S -28B
5,810.00
5,825.00
438.06
87.81
375.13
Pass - Major Risk
S-28 - S-28BPB1 - S-28BPB1
5,810.00
5,825.00
438.06
87.81
375.13
Pass - Major Risk
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown
Out of range
S-401 - S-401 - S-401
10,543.82
6,566.00
1,208.20
292.65
1,022.65
Pass - Major Risk
S-44 - S -44A - S -44A
8,244.42
5,950.00
512.33
227.87
327.88
Pass - Major Risk
111612018 10:05. 11AM Page 4 of 5 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
O.00usft
Reference Well:
S-202
Well Error:
O.00usft
Reference Wellbore
PLAN S -202L4 OA
Reference Design:
S-2021-4 WPO8 OA
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to PLAN KB @ 78.28usft (Original Well Coordinates are relative to: S-202
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK
Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 0.91 °
160(
c
120C
0
0
v
c
0
`m
UQ) 80(
T)
c
U
a)
2 40(
U
Ladder Plot
2500'-" " , ' "`5000 7500 10000
$ S -01,S -01,S-01 V9 Measured Depth (2500 usft/in)
-4- S-01,S-01B,S-01BV4
$ S-218, S-218, S-218 VO
$ S-217, S-217, S-217 V8
S -126,S -126,S -126V12
-� S-401, S-401, S-401 V4
-$- S -111,S -111,S-111 V15
$ S-111,S-111PB2,S-111PB2V4
$ S-111,S-111PB1,S-111PB1 V5
$ S-122,S-122PB3,S-122PB3V2
S-122,S-122PB1,S-122PB1 V4
B2, S-1 8
128 0
B1, S-1 8
SOA
0 V1
E Pla
135 0
12500 $ S -135j WB1,S-1
$ S-135,S-135PB2,S-1
�F S-16,S-16PB1,S-16 B
$ PlanKupS-xxxCove
$ S-202, PLANS -202
$ S-202, PLANS -202 C
$ S-202, PLAN S-202 C BI
-iE-
S-202, PLAN S-2021-1
$ S-13, S -13A, S -13A V
-4- S-02, S-02AL1, S-0 1
$ S-02, S-02APB1, S-0
$ S-02, IGNORE ME, P ai
11/612018 10:05:11AM Page 5 of 5 COMPASS 5000.1 Build 81D
_
--------------
�
I
I I
-I - - - - - - - - - - - - - -
I I
I
-�- S-27, S-27APB1, S-27AP
- -
1 V3
-
-L
I
�
I
lit
--
E
I
I
- II
- - --
L
_I - _ _
I
I
I
-
I
I
II
-- -- --
�
I
I
- -
I
I
I
I
III
I
----'----
I
I
` I
I
- - - -' - - - -
$� S-128, S- 28
S-27, S-2713, S -27B V7
$ S-29,S-29A,S-29AV0
9, S-29ALI, S-29AL1
$ S- 9, S-29, S-29 V 1
$ S , SA4A, S- 4A V0
FO
;
S-128, S-
$ S -128,S-
S -40, S -4)A,
S-40, S-40,
$ S-40, DONT
28,
28
2500'-" " , ' "`5000 7500 10000
$ S -01,S -01,S-01 V9 Measured Depth (2500 usft/in)
-4- S-01,S-01B,S-01BV4
$ S-218, S-218, S-218 VO
$ S-217, S-217, S-217 V8
S -126,S -126,S -126V12
-� S-401, S-401, S-401 V4
-$- S -111,S -111,S-111 V15
$ S-111,S-111PB2,S-111PB2V4
$ S-111,S-111PB1,S-111PB1 V5
$ S-122,S-122PB3,S-122PB3V2
S-122,S-122PB1,S-122PB1 V4
B2, S-1 8
128 0
B1, S-1 8
SOA
0 V1
E Pla
135 0
12500 $ S -135j WB1,S-1
$ S-135,S-135PB2,S-1
�F S-16,S-16PB1,S-16 B
$ PlanKupS-xxxCove
$ S-202, PLANS -202
$ S-202, PLANS -202 C
$ S-202, PLAN S-202 C BI
-iE-
S-202, PLAN S-2021-1
$ S-13, S -13A, S -13A V
-4- S-02, S-02AL1, S-0 1
$ S-02, S-02APB1, S-0
$ S-02, IGNORE ME, P ai
11/612018 10:05:11AM Page 5 of 5 COMPASS 5000.1 Build 81D
Pz-fttoT Nom, WELL DETAILS WELLBOREDETAILS REFERENCEINFORM4TION
Project: PBU Magielc NoM:t65
Site: S ER
cc Ground Level: 38.28 PLANS -202L4 CA Co-ordrate(WE) Reference: Well S-202, True North urc
by Well: S-202 6tra�pR S/41i� Northing: 5979262.300 Vertiral(I'VD)Referance: PIAN KB@ 78.28u8(Original Well FJw) VVf7W
Wellbore: PLANS-202L40A DipAngla:809t Easling: 618885.010 PLANS -202L1 OBB Section (VS)Referenca: Sld-(O.00N, O,OOE)
Plan: S-2021Des1011(1o1 Lattitude: 70°21'7.194N Tie on MD: 5810.00 M -red PLANKBQ78.21ke(OdgiralWdlEleo) aGEoomparry
0NbdrteGCIA201e .Longitude: 149° 2' 4.870 W Cabuletion Ma81od: Woum Curvaaae
SURVEY PROGRAM CASING DETAILS
Depth From Depth SurreRan Tod TAD MD Name Sae
P Y 5099.18 13000.00 410 4.500
40.00 2000.00 S-202L1WPOBOBB (PLAN S-202L1OBB)GYD.GOSS
2000.00 3130.00 S-202L1WPO8OBB (PLAN S-202LIOBB)MW[HFR+MS-WOCA
3130A0 5810.00 S-202L1WPO8OBB (PLAN S-202LIOBB) MWO41FR+MS.WOCA
5810.00 13000.00 S-202L4WPOBOA(PLANS•202L40A) MWD
5810.00 13000.00 S-202L4WPOBOA(PLANS-202L40A) MWDNFR4MS-WOCA
500(
502(
504(
506(
508(
C
510(
512(
A
0. 514(
Q
516(
U
518C
520C
H
522C
524C
526C
AN KB (P78.:
Wect(_)/Fact(+)
SECTION DETAILS
'Id 16.
-KO
ANNOTATIONS
Sec
MD Inc Azi TVD 4W -S +E/ -W
Dleg
TFace VSect
TVD
MD Annotation
1
5810.00 66.00 324.00 5063.02 -154.09 -516.99
0.00
0.00 21.15
5063.02
5810.00 Start Build 16.00-KOP
2
5822.00 67.92 324.00 5067.71 -145.15 -523.48
16.00
0.00 31.70
5067.71
5822.00 Start 12.00 hod at5822.00I
3
5834.00 67.92 324.00 5072.23 -136.16 -530.02
0.00
0.00 42.32
5072.23
5834.00 Start DLS 10.00 TFO 20.00
4
6099.12 93.00 332.79 5115.90 84.91 X65.16
10.00
20.00 295.20
5115.90
6099.12 Start 119.88 hold at 6099.12 MD
5
6219.00 93.00 332.79 5109.63 191.39 -719.90
0.00
0.00 413.64
5109.63
6219.00 Start DLS 2.00 TFO -90.00
6
6399.00 92.99 329.19 5100.21 348.56 -807.05
2.00
-90.00 590.54
5100.21
6399.00 Start 200.00 hold at 6399.00 MD
7
6599.00 92.99 329.19 5089.77 520.10 -909.35
0.00
0.00 785.93
5089.77
6599.00 Start Drop -1.50
8
6699.00 91.49 329.19 5085.85 605.92 -960.53
1.50
180.00 883.68
5085.85
6699.00 Start 450.00 hold at 6699.00 MD
9
7149.00 91.49 329.19 5074.12 992.28 -1190.95
0.00
0.00 1323.75
5074.12
7149.00 Start DLS 2.00 TFO -99.50
10
7404.00 90.65 324.16 5069.35 1205.24 -1330.97
2.00
-99.50 1570.52
5069.35
7404.00 Start 1130.00 hold at 7404.00 MD
11
8534.00 90.65 324.16 5056.57 2121.21 -1992.59
0.00
0.00 2651.08
5056.57
8534.00 S1artDLS2.00TFO86.75
12
9234.00 91.41 338.14 5043.92 2732.69 -2329.47
2.00
86.75 3338.61
5043.92
9234.00 Start DLS 2.00 TFO 96.50
13
10154.00 89.30 356.42 5038.17 3626.25 -2531.15
2.00
96.50 4249.41
5038.17
10154.00 Start 980.00 hold at 10154.00 MD
14
11134.00 89.30 356.42 5050.23 4604.26 -2592.35
0.00
0.00 5194.78
5050.23
11134.00 Start DLS2.00TFO93.00
15
12334.00 88.14 20.40 5077.52 5782.40 -2418.26
2.00
93.00 6253.55
5077.52
12334.00 Start666.00 hold at 12334.00 MD
16
13000.00 88.14 20.40 5099.18 6406.31 -2186.26
0.00
0.00 6769.08
5099.18
13000.00 TDat13000.00
SURVEY PROGRAM CASING DETAILS
Depth From Depth SurreRan Tod TAD MD Name Sae
P Y 5099.18 13000.00 410 4.500
40.00 2000.00 S-202L1WPOBOBB (PLAN S-202L1OBB)GYD.GOSS
2000.00 3130.00 S-202L1WPO8OBB (PLAN S-202LIOBB)MW[HFR+MS-WOCA
3130A0 5810.00 S-202L1WPO8OBB (PLAN S-202LIOBB) MWO41FR+MS.WOCA
5810.00 13000.00 S-202L4WPOBOA(PLANS•202L40A) MWD
5810.00 13000.00 S-202L4WPOBOA(PLANS-202L40A) MWDNFR4MS-WOCA
500(
502(
504(
506(
508(
C
510(
512(
A
0. 514(
Q
516(
U
518C
520C
H
522C
524C
526C
AN KB (P78.:
Wect(_)/Fact(+)
O O S O O N A alO N A O, Oo O N A O N S T r O N L T a O !2 T N O A
O O O O O O O O O O O O O O O O 00 O O O O O O O O O O
O S O S o 0 0 0 o S S S S S o 0 0 0 0 8 0 0 o g O o 0 o g o 0 0
Vertical Section at 341.16° (200 usft/in)
Start
'Id 16.
-KO
S
i
!Start
i
12.00
w&S
oldat5 22.00 AD
10.owi-F02(.00
St
S rtDL 2.00 FO96. 0 S t980.0 hold ]0154.00MD
S 1130. Oholdi 17404. OMD
LS2.0 TF09 .00
tan 60'PF -S6.7 , -
in 450. )0 hold at 66?9 thoM p0 �� S 666. Oholcl t1233
OOM
tart Drop
- I .5
TD
1300000
S DL 2.00T
0
A1112"
b
tartll .88 ho 60
9.12 D
S -202L4 P08 0
-
--
_
- -2-021. 3 WPOSOBA
-
-_ - -- -- - - -- S-
02L1 P08
BB
_
-202L WP08
BC
4-k
5-20 WP0806D
usft
(Origi
al Wel
Elev)
O O S O O N A alO N A O, Oo O N A O N S T r O N L T a O !2 T N O A
O O O O O O O O O O O O O O O O 00 O O O O O O O O O O
O S O S o 0 0 0 o S S S S S o 0 0 0 0 8 0 0 o g O o 0 o g o 0 0
Vertical Section at 341.16° (200 usft/in)
Project: PBU
ANTI -COLLISION SETTINGS COMPANY DETAILS North America -ALASKA- BP
Site: S Interpolation Method: MD,interva1: 25.00 Calculation Method. Minimum Curvature
W611: S-202 Depth Range From. 5810.00 To 13000.00 Error System. ISCWSA�('��
Results Limited By. Centre Distance: 1496.00 Scan Method. Tray. Cylinder North a GE tom n
Niof Wellbore: PLANS -2021,40A Reference: Plan: S -202L4 WPO8 CA (S-202IPLAN S-2021_4 OA) Error Surface. EllipticalConic pa y
Plan: S-202L4WP080A Warning Method Rules Based
SURVEY PROGRAM North America -ALASKA - BP
Depth From Depth To Survey/Plan Tool
40.00 2000.00 S-2021.1 WPO8 OBB (PLAN S-2021_1 OBB) GYD-GC-SS
40 -- -- - - - 2000.00 3130.00 S-2021_1 WPO8 OBB (PLAN S-2021_1 OBB) MWD+IFR+MS-WOCA
3130.00 5810.00 S -202L1 WPO8 OBB (PLAN S -202L1 OBB) MWD+IFR+MS-WOCA
5810.00 13000.00 S -202L4 WPO8 OA (PLAN S-2021_4 OA) MWD
38 - S-118, i -- - `- 5810.00 13000.00 S-2021_4 WP08 CA (PLAN S-2021_4 OA) MWD+IFR+MS-WOCA
36
S-03 - -
17ePM
340,
j
320,- -- - From Colour To MD
S.01 f
300,5-01a _--- S-2b0A. _. - 5810 7400
26 - - S -ole -- - - - F -- 7400 8300
- S-01 C
zs 8300 9000
o S-202�L4 P 8,104 I 9000 11200
N S-115- _
C 24 S-202 WPO8 BD' '' 11200 11800
22 11800 13000
to
2011- �- - -- 2180--
L 180S-1103
L)160- S -202L2 WP08 OBC - _ -
0
14 7
2020 WPO8 OBB - r --
c
U 120
100 S-01 C E S-03 - -
80 S-118 -k
S-2021.3 WP08 OBA
so--_
40
20 - - - --
_ _
C -N W m o K)� 0, ID
O N A o m O N A T co O N A O) ao O N A O m O O O O do
O O O
O O O O O O O O O O O O O O O O O O N A O O N A O m O N A O co O
O O O O O O O O O O O O O O O O O O O o O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O
Measured Depth (200 usft/in)
WELL DETAILS: ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP
Project: PBU
p Site: S Ground Level: 38.28 Interpolation Method: MD, 25.00 Calculation Met hod: Minimum Curvature
Well: S-202 Norhting: 5979262.300 Depth Range From: 5810.00 To 13000.00 Error System: ISCWSA V�UIEGRIHES0 bBWellbore: PLANS•202L40A Easting: 618885.010 Results Limned By: Centre Distance: 1496.00 Scan Method: Tray. Cylinder North Ucompamy
Platt: S-2021_4 WPOS OA Lattnude: 70° 21' 7.194 N Reference: S-2021_4 WPO8 OA Error Surface: EllipticalConic
Longitude: 149° 7 4.870 W Warning Method: Rules Based
Traveling Cylinder
S -202L4 WPO8 OA
5810.00 To 13000.00
//%300
S-
27
21
SURVEYPROGRAM
Depth From Depth To Survey/Plan Tool
40.00 2000.00 S-2021_1 WP08 OBB (PLAN S-2020 OBB) GYD-GC-SS
2000.00 3130.00 S-2021.1 WPO8 OBB (PLAN S-2021_1 OBB) MWD+IFR+MSWOCA
3130.00 5810.00 S-2021-1 WP08 OBB (PLAN S-2021_1 088) MWD+IFR+MS-WOCA
5810.00 13000.00 S-2021_4 WP08 OA (PLAN S2021_4 OA) MWD
5810.00 13000.00 S-2021-4 WP08 OA (PLAN S2021_4 OA) MWD+IFR+MSWOCA
180
Azimuth from North [°] vs Centre to Centre Separation [10 usf /in]
From Colour To MD
5810 7400
7400 8300
8300 - 9000
9000 11200
11200 11800
11800 13000
S-202
120
180
Azimuth from North(*] vs Centre to Centre Separation (30 usfV nl
50
SECTION DETAILS
Sec MD Inc
An
TVD
+N/ -S +E/ -W
Dleg
TFace VSect
1 5810.00 66.00
324.00
5063.02
-154.09 -516.99
0.00
0.00 21.15
2 5822.0067.92
324.00
5067.71
-145.15 -523,48
16.00
0.00 31.70
3 5834.00 67,92
324.00
5072.23
-136.16 -530.02
0.00
0.00 42.32
4 6099.12 93.00
332.79
5115.90
84.91 -665.16
10.00
20.00 295.20
5 6219.00 93.00
332.79
5109.63
191.39 -719.90
0.00
0.00 413.64
6 6399.00 92.99
329.19
5100.21
348.56 -807.05
2.00
.90.00 590.54
7 6599.00 92.99
329.19
5089.77
520.10 -909,35
0.00
0,00 785.93
8 6699.00 91.49
329.19
5085.85
605.92 -960.53
1.50
180.00 883.68
9 7149.00 91.49
329.19
5074.12
992.28 -1190.95
0.00
0.00 1323.75
10 7404.00 90.65
324.16
5069.35
1205.24 -1330.97
2.00
.99.50 1570.52
11 8534.00 90.65
324.16
5056.57
2121.21 -1992.59
0.00
0.00 2651.08
129234.00 91.41
338.14
5043.92
2732.69 -2329.47
2.00
86.75 3338.61
13 10154.00 89.30
356.42
5038.17
3626.25 .2531.15
2.00
96.50 4249.41
14 11134.00 89.30
356.42
5050.23
4604.26 -2592.35
0.00
0,00 5194,78
15 12334.00 88.14
20.40
5077.52
5782.40 -2418.26
2.00
93.00 6253.55
16 13000.00 88.14
20,40
5099.18
6406.31 -2186.26
0.00
0.00 6769.08
180
Azimuth from North(*] vs Centre to Centre Separation (30 usfV nl
50
Project PBU
Site: S
a:1„m,emrrea Nom WELLBORE DETAILS: PLAN S -202L1 1 REFERENCEINFORMATION
Meg,e No m:1657
Ceerdrate(Ntp Refamooe-. Well &202, True Nash
Well: S-202
MegrcECF u
Stwpn 574DB:sn Vereml(TVO)Refamn PLAN KB@ 78.28mIt(Original Well Eley)
Tie on MD: 40.00
OipArigb 8091 Secfipn (VS)Rekrenae: SlpI-(D0N,-0OOOE)
Dme 1111e20t
Wet B3GWM Measured DePlItRs.—PLAN KB@re78.2B(OriginelWell Elev)
AOGCC Spider Plot - Offsets within 200ft
Easting (400 usfVin)
0 9 0
0 0 0
0
598760
0
5987600
598720
5987200
5986600
S-202 / S-2020 / S: 202L2 / S-020 I S -2110" S
WP08 Plus
Oft'M DL4
� 0
�
5986800
598640
- - - - - - - - - S-202 WP08 OBD Plus 50011 MD -
- -
- - 5986400
- _ $2621-1 Wf'08 OBB Plus 50011 MD
598600
- ZS- WP08 OBC Plus 500ff. MD
5986000
S-202L�WP08 OBA Plus 500ft MD
598560
-
- 5985600
S -13A S-20214 WP08 OA Plus 500ft MD
''.
598520
-
ro _
o
5985200
598480
-. -
i o
.
5984800
0
0
9z6p
5984400
o�.
- - S-16
- - -
-.- 5984400
9000
i, I
5984000
-...:.
-. _.
I
_._ -_I,_-._
i
5984000
5983600
-
-
- �- '`- -- - - - -
- - 5983600
G
8000 000
,
}
.e 598320
L,i
5983200
8
i
^
5982800
c
f�.,. ....I- -.-.
- 5982800 g
L
o 5982400
7000
- - --
- -
N
59824009
Z
598200
-}
-
j T- -
! - - - - -
-
- 5982000
0000
598160--
I
-
6000 -
I
---- �_
- 5981600
598120
�I.
r
III.
�
sselzoo
598080
-
-
I - -
i - -
5980800
598040
- - $-17B 5000
i,. -
- 5980400
7 . 9000
5980000-
B�q
5980000
5979600
<m
0
S 17 0D q
� O�i17
-_I
-
5979600
597920
S-126
_ -_ -
o S-17CPB2
�,.--_
w3.0 (Kodiak Brown)
__ _..
5979200
597880
,� o
0
o o A
5978800
o S-17 S -40A
a o G
O
s00
597840
- o
S-128 5-134
0 5-135
5978400
go
S-188
5-128PB2, S•135P _ 28B S-217 5-21@'
135PBT O
2 T m,
0
8 8 0 0 0
0 0
0 8 8 8 8 8 o o o 8 8 9 8 8 8
0 0 8 8 8 8
8 8 8 S 8
0 o Easting (400 ustUiin) 0 0 0 0
o o 0
0
i
North America - ALASKA - BP
PBU
S
S-202
PLAN S-2021-4 OA
S-2021-4 WP08 OA Plus 500ft MD
AOGCC Offset Well Report
21 August, 2019
North America - ALASKA - BP
PBU
S
S-202
PLAN S-2021-4 OA
S-2021-4 WP08 OA Plus 500ft MD
AOGCC Offset Well Report
21 August, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
S
Site Error:
0.00usft
Reference Well:
S-202
Well Error:
0.00usft
Reference Wellbore
PLAN S-2021-4 OA
Reference Design:
S-2021-4 WP08 OA Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well S-202
PLAN KB @ 78.28usft (Original Well Elev)
PLAN KB @ 78.28usft (Original Well Elev)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
teference S -202L4 WP08 OA Plus 500ft MD
:iltertype: NO GLOBAL FILTER: Using user defined selection & filtering criteria
nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA
)epth Range: Unlimited Scan Method: Tray. Cylinder North
tesults Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic
Survey Tool Program
From
(usft)
40.00
2,000.00
3,130.00
5,810.00
5,810.00
Date 8/21/2019
To
(usft) Survey (Wellbore)
Tool Name
Description
2,000.00 S-2021-1 WP08 OBB (PLAN S-2021-1 OBB
GYD-GC-SS
Gyrodata gyro single shots
3,130.00 S -202L1 WP08 OBB (PLAN S -202L1 OBB
MWD+IFR+MS-WOCA
MWD +IFR + Multi Station W/O Crustal
5,810.00 S-2021-1 WP08 OBB (PLAN S -202L1 OBB
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
13,500.00 S-2021-4 WP08 OA Plus 500ft MD (PLAN
MWD
MWD - Standard
13,500.00 S -202L4 WP08 OA Plus 500ft MD (PLAN
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
8/21/2019 2.14:05PM Page 2 of 97 COMPASS 5000.1 Build 81D
BP
0 by Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well S-202
Project:
PBU
ND Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Reference Site:
S
MD Reference:
PLAN KB @ 78.28usft (Original Well Elev)
Site Error:
O.00usft
North Reference:
True
Reference Well:
S-202
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
PLAN S -202L4 OA
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
S-20214 WP08 OA Plus 500ft MD
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
S
S-118 - S-118 - S-118
6,318.88
5,375.00
136.48
5-126 - 5-126 - S-126
535.77
525.00
113.69
S-128 - S-128 - 5-128
586.26
575.00
166.37
S-128 - S-128PB1 - 5-12BP81
479.44
468.00
161.73
S-128 - S-128PB2 - S-128PB2
586.27
575.00
166.00
S-134 - S-134 - S-134
1,302.98
1,300.00
99.91
S-135 - S-135 - S-135
243.69
250.00
33.35
S-135 - 5-135PB1 - 5-135PB1
243.69
250.00
33.35
S-135 - S-1 35P82 - S-135PB2
243.69
250.00
33.35
S-16 - S-16 - S-16
909.92
900.00
127.26
S-16 - S-16PB1 - S-16PB1
909.92
900.00
127.26
S-17 - S-17 - S-17
760.66
750.00
15.26
S-17 - S-1 7A - S-1 7A
760.66
750.00
15.26
5-17 - S-17AL1 - S-17AL1
760.66
750.00
15.26
S-17 - S-17AL1 PB1 - S-17AL1 PBI
760.66
750.00
15.26
5-17 - S-17APB1 - S-17APB1
760.66
750.00
15.26
S-17 - S -17B - S -17B
760.66
750.00
15.26
S-17 - S -17C - S -17C
760.66
750.00
15.26
S-17 - S-17CPB1 - S-17CPB1
760.66
750.00
15.26
S-17 - S-17CPB2 - S-17CPB2
760.66
750.00
15.26
S-18 - 5-18 - S-18
628.02
625.00
95.26
S-18 - S-1 8A - S-1 8A
631.03
625.00
95.33
S-18 - S-1 8B - S-1 8B
631.03
625.00
95.33
S-202 - PLAN S-202 OBD - S-202 WP08 OBD
6,128.88
6,150.00
74.83
S-202 - PLAN S-2021-1 OBB - 5-2021-1 WP08 OBB
12,837.19
13,000.00
138.61
S-202 - PLAN S-2021-2 OBC - S-2021-2 WPO8 OBC
11,132.93
11,200.00
141.74
5-202 - PLAN S-2021-3 OBA- S-2021-3 WPOB OBA
11,376.56
11,425.00
77.08
S-202 - PLAN S-2021-4 OA- S-2021-4 WP08 OA
12,325.00
12,325.00
0.00
S-214 - PLAN S-214 - NB - S-214 WP09 NB
974.28
975.00
30.89
S-214 - PLAN S-2141-1 - OBD - 5-2141-1 WP09 - OBD
974.28
975.00
30.89
S-214 - PLAN S-21411-01 - OBB - 5-2141-1-01 WP09 OBB
974.28
975.00
30.89
S-214 - PLAN S -214L1-02 - OBC - 5-2141-1-02 WP09 - OBC
974.28
975.00
30.89
S-214 - PLAN S-2141-2 - OBA- S-2141-2 WP09 - OBA
974.28
975.00
30.89
S-214 - PLAN S-2141-3 - OA - S-2141-3 WP09 - OA
974.28
975.00
30.89
S-217 - S-217 - 5-217
928.35
925.00
52.71
5-218 - S-218 - S-218
1,055.63
1,050.00
32.53
S-28 - S-28 - S-28
5,689.60
5,400.00
163.37
5-28 - S -28A - S -28A
5,689.60
5,400.00
163.37
S-28 - S -28B - S -28B
5,689.96
5,400.00
163.37
S-28 - S-288PB1 - S-28BPB1
5,689.96
5,400.00
163.37
S-40 - DONT USE Plan S -40B v3.0 (Kodiak Brown) - Plan S -40B v3.0
40.08
40.08
17.22
(Kodiak Brown)
S-40 - S-40 - S-40
860.21
850.00
18.84
5-40 - S -40A - S -40A
860.21
850.00
18.84
812112019 2:14:05PM Page 3 of 3 COMPASS 5000.1 Build 81D
TRANSMITTAL LETTER CHECKLIST
WELL NAME: 1 �- �a L.
PTD: 3_1 i - r a L+
development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: r(;,(, O Gl POOL: Yu (� �j/ (U` �-;� O
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
LATERAL
The permit is for a new wellbore segment of existing well Permit
No. 't c(—(J>, API No. 50- OZ9 - 00 - pp.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -) from records, data and logs acquired for well
name on ermit .
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Compan Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
d
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
�/
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, SCHRADER BLUF OIL - 64013
- - -- -
--
well Name: PRUDHOE BAY UNITS 2021_4 Program _DEV____ ___ Well bore seg
PTD#: 2191240 Company BP Exploration Alaska).lnc. _ _ _ . Initial Class/Type
DEV/PEND GeoArea 890 Unit 11650 _ On/Off Shore On Annular Dispc
Administration
1
Permit -fee attached -
NA
2
Lease number appropriate_
Yes
3
Unique well, name and number - - - - - - -
Yes
4
Well located in a_defined.pool
Yes
5
Well located proper distance from drilling unit -boundary
Yes
6
Well located proper distance from other wells_
Yes
- ---- - ----- -- ---- ----------- - -
7
Sufficient acreage -available in drilling unit_
Yes
--------------- ----- ---- ----------------------
8
If deviated, is wellbore plat included
Yes
Directional plan view & wellbore profile included.
9
Operator only affected party..
Yes
10
Operator has appropriate_ bond in force - - -
Yes
11
Permit can be issued without conservation order_
Yes
Appr Date
112
Permit_can be issued without administrativ_e_approval
Yes
13
Can permit be approved before 15-daywa_it_
Yes
DLB 9/11/2019
- -
14
Well located within area and strata authorized by_ Injection Order # (put 10# in comments) -(For_
NA
------- -------------------------------
15
All wells within -1/4_mile _area -of review identified (For service well only)-
NA_
16
Pre -produced injector: duration of pre -production less than 3 months- (For _service well only)
NA_
- - .
17
_Nonconven, gas conforms to AS31.05.030Q.1.A),(j.2.A-D)
NA_
18
Conductor string_ provided - -
Yes
34" x 20 conductor set to 115' MD
Engineering
19
Surface casing_ protects all known USDWs - - - - --Yes
PFB 1862'ssTVD, SC -shoe to 2887 ssTVD,-fully cemented_
20
CMT vol adequate to circulate_on conductor & su_rf_csg
Yes
Fully cemented surface casing- - - - .
21
CMT -vol_ adequate to tie -in -long string to -surf csg
Yes
22
CMT will cover all known -productive horizons_
Yes
to 1500' -MD above to f. the SB
TOC on 7-5/8" casing from shoe p . o
123
Casing designs adequate for CJ, B &_ permafrost
Yes
24
Adequate tan_kage_or reserve pit - - - - - - - - -
Yes
Parker 272 has ongoing operations and -good truck and fluids support
25
If -a_ re -drill, has a 1.0-403 for abandonment been approved - - - - -
NA_
This is a new grassroots_ well- - - - - - - ------------------------------
26
Adequate wellbore separation_proposed_
Yes-
S-201_ will be shut in, S-17 and S-40 will be secured with deep plugs _ee set_
127
If-diverter required, does it meet_ regulations_ - - - - - -
Yes
---
Appr Date
28
-Drilling fluid -program schematic_& equip -list -adequate _ - - -
Yes
All fluids overbalanced to pore pressure
MGR 9/16/2019
29
BOPEs,_do they meet regulation
Yes
- - - 1 annular and 3_ram stack - - - - - - - - - - -
30
BO -PE -press rating appropriate; test to (put psig in comments)_ - - -
Yes
5M stack tested to 3500_psi_ - - - - - - - .
31
Choke -manifold complies w/API_ RP -53 (May 84)_ - - -
Yes -
- - - -
32
Work will occur without operation shutdown_ - - -
Yes
Parker 272 is ongoing operations
33
Is presence_ of H2S gas probable -
Yes
- Spad is_ and H2S pad, standard BP monitoring will be in place
34
Mechanical -condition of wells within AOR verified (Forservicewell only) - - - - -
NA
35
Permit_can be issued w/o hydrogen sulfide measures - . - - - - - - - -
No -
S -Pad Schrader Bluff_ wells are _H2S-bearing. H2S_ measures are required.
Geology
36
Data -presented on potential overpressure zones - - -
Yes _
_
No abnormally geo-pressured strata -are anticipated. _
Appr Date
37
Seismic analysis of shallow gas -zones- - -
NA_
- - - - - -
DLB 9/11/2019
138
Seabed condition survey -(if off -shore)
NA_
[39
Contact name/phone for weekly_ progress reports- [exploratory only] - - - - - - _
NA_ -
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Commissioner Date
(I
�� ���IA �1 j1�