Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
219-148
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-09C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-148 50-029-20251-03-00 12136 Conductor Surface Intermediate Production Liner 9041 80 2667 6067 3606 2835 10565 20" x 30" 13-3/8" 9-5/8" 7-5/8" 3-1/2" x 3-1/4" x 2-7/8" 9029 35 - 115 34 - 2701 33 - 6100 5849 - 9455 8272 - 11107 35 - 115 34 - 2701 33 - 5749 5534 - 8778 7756 - 9053 10748, 10748 2670 4760 4790 10530 10565 4930 6870 6890 10160 9860 - 10960 4-1/2" 12.6# L-80 30 - 9455 9027 - 9044 Structural No Packer No Packer No Packer Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 30 - 8778 N/A N/A 328 485 29752 18816 54 101 1000 1550 1040 1000 325-478 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:24 pm, Sep 19, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.09.19 12:54:16 - 08'00' Torin Roschinger (4662) RBDMS JSB 092525 J.Lau 11/6/25 ACTIVITY DATE SUMMARY 8/28/2025 *** WELL S/I ON ARRIVAL *** PULLED DREAMCATCHER FROM 2095' SLM, 2 ROCKS IN DREAMCATCHER RAN 30' x 2.00" DUMMY GUNS(2.29" SWELL RINGS) TO DEVIATION @ 9797' SLM (~77 Deg Deviation & 29 Deg Dogleg) ***WELL LEFT S/I ON DEPARTURE, NOTIFY PAD OP OF WELL STATUS*** 9/1/2025 CTU #8 1.75" CT 0.145" WT Job Scope: Drift, Caliper w/GR/CCL, Set CIBP, Ext Adperf Travel to location. MIRU CTU. M/U NS CTC and MHA w/2.25" drift to 10745' CTMD, POOH LD drift BHA MU/RIH with GR/Caliper. Log from 10700' stop at 10250' paint uncorrected EOP flag. Continue logging to surface. LD Caliper BHA recover data w/ - 5' correction. MU/CIBP get on well and start killing. ...Continue WSR on 9/2/2025.. 9/2/2025 CTU #8 1.75" CT, 1.45" WT Job Scope: Drift, Caliper w/GR/CCL, Set CIBP, Ext Adperf Continue killing well. Bump test H2S and LEL alarms. RIH w/ NS CIBP. Correct at flag. Set at 10565'. POOH. Good no-flow at surface. L/D NS setting tool. Recover ball. Deploy 150' HES Maxforce guns. 6spf, 60 degree phase .28" EHD. RIH. Correct depth to top shot. Perforate interval 10290-10440'. Well on losses. Pump MCHF while POOH. Good no-flow at surface, well on .7bpm losses. Un-deploy HES guns. FP well with 38 bbls diesel. RDMO **Perform kick while tripping drill with all personnel** ...Job complete.. 9/3/2025 ***WELL S/I ON ARRIVAL*** RAN 4 1/2" BLB & 3.79" GAUGE RING TO BRUSH NIPPLE @ 2,095' MD SET ROCK SCREEN(18'-8") @ 2,095' MD RAN 4 1/2" X CHECK SET TO ROCK SCREEN(Sheared). ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU J-09C PBU J-09C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-148 50-029-20251-03-00 341J ADL 0028281 12136 9041 80 2667 6067 3606 2835 11087 20" x 30" 13-3/8" 9-5/8" 7-5/8" 3-1/2" x 3-1/4" x 2-7/8" 9051 35 - 115 34 - 2701 33 - 6100 5849 - 9455 8272 - 11107 2620 35 - 115 34 - 2701 33 - 5749 5534 - 8778 7756 - 9053 10746, 10748None 4930 6870 6890 10160 9860 - 10960 4-1/2" 12.6# L-80 30 - 94559027 - 9044 No Packer No SSSV Installed Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 PRUDHOE BAY 8/26/2025 PRUDHOE OIL PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.08.12 14:54:46 - 08'00' Torin Roschinger (4662) By Grace Christianson at 3:23 pm, Aug 12, 2025 325-478 Perforating gun not to exceed 500'. Reestablish pressure containment prior to perforating. Perform and document well control drill on each shift using attached standing orders and verify correct XO for safety joint. Ensure well is dead before breaking containment A.Dewhurst 15AUG25 DSR-8/14/25JJL 8/13/25 10-404 *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.08.18 14:01:27 -08'00'08/18/25 RBDMS JSB 082025 8/26/25 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, March 4, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC J-09C PRUDHOE BAY UNIT J-09C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 03/04/2024 J-09C 50-029-20251-03-00 219-148-0 N SPT 8806 2191480 2500 683 2749 2660 2626 70 79 81 81 OTHER P Kam StJohn 1/18/2024 2 Year AOGCC CMIT-T x IA Per CO 736 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT J-09C Inspection Date: Tubing OA Packer Depth 537 2751 2607 2561IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS240119123712 BBL Pumped:8 BBL Returned:4.4 Monday, March 4, 2024 Page 1 of 1 1-Oil producer; IA remedial cement MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, March 4, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC J-09C PRUDHOE BAY UNIT J-09C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 03/04/2024 J-09C 50-029-20251-03-00 219-148-0 N SPT 8806 2191480 2500 661 2746 2653 2621 76 78 75 75 OTHER P Kam StJohn 1/18/2024 2 Year AOGCC MIT-T per CO 736 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT J-09C Inspection Date: Tubing OA Packer Depth 662 772 801 810IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS240119123355 BBL Pumped:1.7 BBL Returned:1.5 Monday, March 4, 2024 Page 1 of 1 1-Oil producer; IA remedial cement 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-09C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 219-148 50-029-20251-03-00 12136 Conductor Surface Intermediate Production Liner 9041 80 2667 6067 3606 2835 11087 20" x 30" 13-3/8" 9-5/8" 7-5/8" 3-1/2" x 3-1/4" x 2-7/8" 9051 35 - 115 34 - 2701 33 - 6100 5849 - 9455 8272 - 11107 35 - 115 34 - 2701 33 - 5749 5534 - 8778 7756 - 9053 10746, 10748 2670 4760 4790 10530 None 4930 6870 6890 10160 9860 - 10960 4-1/2" 12.6# L-80 30 - 9455 9027 - 9044 Structural No Packer No SSSV Installed No Packer No Packer Stan Golis Sr. Area Operations Manager Josh Stephens Josh.Stephens@hilcorp.com 970.779.1200 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 30 - 8778 212 1057 28030 11042 40 254 1425 1989 878 207 322-556 13b. Pools active after work:Prudhoe Oil No SSSV Installed No Packer STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations N/A N/A the best of my knowled February 8, 2023 By Meredith Guhl at 8:32 am, Feb 08, 2023 DSR-2/8/23MGR03MARCH2023 RBDMS JSB 021423 Perforate 322-556 Extended Perf w CTUil d biCoiled Tubing Ops PBU J-09C PRUDHOE BAY, PRUDHOE OIL 219-148 Sundry Number ACTIVITY DATE SUMMARY 10/19/2022 ***WELL S/I ON ARRIVAL*** DRIFT 3.84' CENT, 2.50" S.BAILER TO DREAM CATCHER @ 2,095' MD (no sample) PULLED 4-1/2" DREAM CATCHER FROM 2,095' MD RAN 30' x 2.00", ( max swell 2.29") DMY GUNS TO DEVIATION @ 9,805' SLM (77*- 84* deviation). *** WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED, JOB COMPLETE.*** 1/29/2023 FREEZE PROTECT J-09 FLOW LINE FOR WELL TESTERS ON WELL J-20. Pumped Down flow line 3 BBLS 60/40, 8 BBLS CRUDE, 5 BBLS 60/40, 26 BBLS CRUDE, 1 BBLS 60/40 at 5 bpm Pressure up to 1500 Psi. 2/2/2023 LRS CTU #2 - 1.50" Blue Coil Job Objective: Log / Ext APF MIRU CTU. Make up HES GR/CCL logging tools w/ 2.25" DJN BHA. ***Continued on 2/3/23*** 2/3/2023 LRS CTU #2 - 1.50" Blue Coil Job Objective: Log / Ext APF Log from 10400 to 8100'. Paint flag at 9810'. Pooh. Log data shows a -1' correction. TIe in confirmed with RE. Standby on cold temps. Begin deploying perf guns. Crane malfunctions over well center. Retrieve guns with picker winch. Repair crane. Deploy perf guns with new crane Tie-in at flag. Perforate interval 9860 - 10015'. POOH maintaining hole fill. ***Continued on 2/4/23*** 2/4/2023 LRS CTU #2 - 1.50" Blue Coil Job Objective: Log / Ext APF Lay down Perf Gun BHA. Freeze protect to 2500 TVD with diesel. RDMO ***Job Complete*** 2/5/2023 ***WELL S/I ON ARRIVAL*** (Perforating) RU POLLARD UNIT #60 ***WSR CONTINUED ON 2/6/23 WSR*** 2/6/2023 LRS Test Unit 6, Begin WSR on 2/6/23 Rate Verification, IL J-09 / OL J-07, Begin SB, Continue WSR on 2/7/23 2/6/2023 ***CONTINUED FROM 2/5/23 WSR*** (Perforating) SET 3.81" DREAM CATCHER @ 2,095' MD RAN 4 1/2" X CHECK SET TO 2,095' MD (Sheared) ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations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y Anne Prysunka at 1:49 pm, Sep 20, 2022 '65 ; 0*56(3-/& Gregory Wilson Digitally signed by Gregory Wilson Date: 2022.09.23 12:06:24 -08'00' RBDMS JSB 092922 tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ tĞůůEĂŵĞ͗:ͲϬϵW/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϬϮϱϭͲϬϯͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KƉĞƌĂďůĞ ZŝŐ͗ϭ͘ϱ͟Žƌϭ͘ϳϱ͟ dh ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗KĐƚŽďĞƌ ϱ͕ϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϮĚĂLJƐ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ ϱϲϰͲϰϵϭϱ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗:ŽŚŶ ŽŶĚŝŽ ϲϬϮ͘ϯϳϯ͘Ϭϲϱϵ ;ĐͿ ^ĞĐŽŶĚ ĂůůŶŐŝŶĞĞƌ͗tLJĂƚƚZŝǀĂƌĚ ϱϬϵ͘ϲϳϬ͘ϴϬϬϭ;ĐͿ 'ĞŽĨŽƌdŝĞͲŝŶ ƐŚůLJŶDƵƌƉŚLJ ϴϯϮͲϰϭϳͲϭϲϰϬ;ĐͿ ƵƌƌĞŶƚ,W͗ϯϬϴϬ ƉƐŝΛ ϴϴϬϬ͛ds ;ĞƐƚŝŵĂƚĞĚͿ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϯϱϬ ƉƐŝ Λ ϴϴϬϬ͛ ds ;ϳ͘ϰWW'ͮǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ DW^W͗ϮϮϬϱ ƉƐŝ ;Ϭ͘ϭƉƐŝͬĨƚŐĂƐƚŽƐƵƌĨĂĐĞͿ ^/t,W ϮϮϬϬƉƐŝ ;ϭͬϮϯͬϮϬϮϮͿ DŝŶ/͗Ϯ͘ϳϴϲ͟yK Λ ϴϯϯϬ͛ DĂdžŶŐůĞ͗ ϵϰ ĚĞŐΛϭϭ͕ϱϭϲ͛ŵĚ dŝĞͲŝŶ>ŽŐ͗ :ͲϬϵZWDWEϯ͕ϭϰͲ:ĂŶͲϮϬϮϬ͕WĂƐƐϬϭhƉ͕ϱŝŶĐŚƐĐĂůĞ KďũĞĐƚŝǀĞ WƌŽƉŽƐĞ ŝƐ ƚŽĂĚĚ/ǀŝƐŚĂŬ ϭĞdžƚĞŶĚĞĚƉĞƌĨŽƌĂƚŝŽŶƐ͕ϵ͕ϴϲϬͲϭϬ͕Ϭϭϱ͛ŵĚ͕ϭϱϱΖƚŽƚĂů͕ŶŽƐƉĂĐĞƌƐ͘dŚĞ'KZŚĂƐ ƐůŽǁůLJƌŝƐĞŶŽǀĞƌƚŚĞǁĞůů͛ƐůŝĨĞĂŶĚŝƐŶŽǁŚŝŐŚĞŶŽƵŐŚƚŽũƵƐ ƚŝĨLJƚĂƌŐĞƚŝŶŐƚŚĞϭƐĂŶĚƐŝŶƚŚĞŚĞĞůĨŽƌĂŶĂĚĚ ƉĞƌĨ͘dŚĞƌĞŝƐĂƐůŝŐŚƚƌŝƐŬŽĨŐĂƐƵŶĚĞƌƚŚĞϭϰEƐŚĂůĞƐŽƚŚĞ ƉĞƌĨƐĂƌĞƐƚĂŶĚŝŶŐŽĨĨĨƌŽŵƚŚĂƚŝŶƚĞƌǀĂů͘dŚĞ ĞdžŝƐƚŝŶŐϮƉĞƌĨƐǁŝůůƌĞŵĂŝŶŽƉĞŶĂŶĚƚŚĞƉƌŽĚƵĐƚŝŽŶǁŝůůďĞĐ ŽŵŵŝŶŐůĞĚ͘ tĞůůǀĞŶƚƐ ϭͬϮϰͬϮϮ ΛLJͲLJĞĂƌK'ǁŝƚŶĞƐƐĞĚD/dͲdΘD/dͲddž/ƉĂƐƐĞĚƚŽϮϱϬϬƉƐŝ ϮͬϮϬͬϮϬ ^>ŵĂĚĞϯĂƚƚĞŵƉƚƐƚŽƉƵůů>'>sĨƌŽŵƐƚĂηϮ͕ĐĞŵĞŶƚĞĚŝŶƉůĂĐĞ͕ƐĞƚĚƌĞĂŵĐĂƚĐŚĞƌΛϮϬϵϱ͛ ϮͬϵͬϮϬ dKĂƚϰϯϴϲ͛ĨƌŽŵŵĞŵŽƌLJZdůŽŐ ϭͬϯϭͬϮϬ K'ǁŝƚŶĞƐƐĞĚ D/dͲdƉĂƐƐĞĚƚŽϮϱϲϯƉƐŝ ;ůŝŶĞƌƚŽƉŝŶĐůƵĚĞĚŝŶƚŚĞƉĂƐƐŝŶŐD/dͲdͿΘ D/dͲ ddž/ƉĂƐƐĞĚϮϱϴϰƉƐŝ ϭͬϮϬͬϮϬ dĐŽŵƉůĞƚĞĚ /ĐŵƚƐƋnjƚŽƌĞƉĂŝƌƚƵďŝŶŐ ůĞĂŬƐϱϮϭϲ͛ŵĚ͕ĐĞŵĞŶƚƌĞƚĂŝŶĞƌĂŶĚƉůƵŐƉĂƌƚƐ ŵŝůůĞĚͬƉƵƐŚĞĚƚŽ ϭϬϳϰϳ͛ ŽŶƚŽƉŽĨƉĞƌĨŐƵŶƐ>/, ϭͬϭϯͬϮϬ &ŝƐŚ͗ dƉƵƐŚĞĚ Εϯϭϴ͛ ƉĞƌĨŐƵŶĨƌŽŵϵϳϰϱ͛ƚŽϭϬϳϰϴ͛ ϭϮͬϭϱͬϭϵ důĞĨƚϯϭϳ͘ϱ͛ƐƉĞŶƚƉĞƌĨŐƵŶĂƐƐĞŵďůLJŝŶŚŽůĞĂĨƚĞƌĨŝƌŝŶŐ WƌŽĐĞĚƵƌĞ͗ ^ůŝĐŬůŝŶĞ ϭ͘ WƵůůϰͲϭͬϮ͟ĚƌĞĂŵĐĂƚĐŚĞƌŽŶyͲůŽĐŬĂƚϮϬϵϱ͛ŵĚ Ϯ͘ ƌŝĨƚƚŽĚĞǀŝĂƚŝŽŶĨŽƌϮ͘Ϭ͟ƉĞƌĨŐƵŶƐ͕ŵĂdžƐǁĞůůсϮ͘Ϯϯ͕͟Θ&ĂƐŶĞĐĞƐƐĂƌLJ͘ ŽŝůdƵďŝŶŐ͗ EŽƚĞƐ͗ x ƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨdžƚĞŶĚĞĚWĞƌĨŽƌĂƚŝŶŐũŽďƐ͕ϮϰͲŚŽƵƌĐƌĞǁĂŶĚt^^ ĐŽǀĞƌĂŐĞŝƐ ƌĞƋƵŝƌĞĚ͘ x dŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞŝŶŝƚŝĂůƉĞƌĨƐŐƵŶƐ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞ ĚƵƌŝŶŐƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJ ďƵůůŚĞĂĚŝŶŐŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞ ƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌ ƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚƚŚĞ ƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞĨŝƌŝŶŐŚĞĂĚ͘ ϮϮϬϱ ƉƐŝ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϭ͘ ĨƚĞƌDhD,ĂŶĚƉƵůůƚĞƐƚŝŶŐƚŚĞd͕ƚĂŐͲƵƉŽŶƚŚĞdƐƚƌŝƉƉĞƌƚŽĞŶƐƵƌĞ,ĐĂŶŶŽƚƉƵůůƚŚƌŽƵŐŚ ƚŚĞďƌĂƐƐƵƉŽŶWKK,ǁŝƚŚŐƵŶƐ͘ Ϯ͘ ƵůůŚĞĂĚΕ ϮϮϬ ďďůƐ;ϭ͘ϱtsƚŽƚŽƉƉĞƌĨͿŽĨϭй<>ͬ^tĚŽǁŶƚƵďŝŶŐ͘DĂdžƚƵďŝŶŐƉƌĞƐƐƵƌĞϮϱϬϬ ƉƐŝ͘;dŚŝƐƐƚĞƉĐĂŶďĞƉĞƌĨŽƌŵĞĚĂŶLJƚŝŵĞƉƌŝŽƌƚŽŽƉĞŶͲŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨƚŚĞƉĞƌĨŐƵŶƐ͘dŝŵŝŶŐ ŽĨƚŚĞǁĞůůŬŝůůŝƐĂƚƚŚĞĚŝƐĐƌĞƚŝŽŶŽĨƚŚĞt^^͘Ϳ Ă͘ tĞůůďŽƌĞǀŽůƵŵĞƚŽƚŽƉƉĞƌĨс ϭϰϰ͘ϲ ďďůƐ ď͘ ϰͲϭͬϮ͟ ƚƵďŝŶŐ ƚŽ ϴϮϴϮ͛;dK>Ϳy͘ϬϭϱϮďƉĨсϭϮϱ͘ϵ ďďůƐ Đ͘ ϯͲϭͬϮ͟ ůŝŶĞƌƚŽ yK͕ ;ϱϴ͛Ϳ y͘ϬϬϴϳ ďƉĨс Ϭ͘ϱ ďďůƐ Ě͘ ϯͲϭͬϰ͟ ůŝŶĞƌƚŽ ƚŽƉƉĞƌĨ͕ ;ϮϯϬϬ͛Ϳ yϬϬϳϵďƉĨс ϭϴ͘ϮďďůƐ ϯ͘ DhĂŶĚZ/,ǁŝƚŚDD'Zͬ>ůŽŐŐŝŶŐƚŽŽůƐ ĂŶĚ:E͘ƌŝĨƚƚŽΕϭϬϬ ϱϬ͛ ĨŽƌϮ͘Ϭ͟DŝůůĞŶŶŝƵŵŐƵŶƐ͕ŵĂdž ƐǁĞůůŝŶůŝƋƵŝĚсϮ͘Ϯϯ͕͟;ĨŝƐŚĂƚϭϬϳϰϲ͕͛ŵĂLJƌĞƋƵŝƌĞĂĐůĞĂŶŽƵƚƌƵŶŽƌǀĞŶƚƵƌŝŝĨĚƌŝĨƚŝƐŶŽƚĐůĞĂŶͿ ϰ͘ >ŽŐƚŝĞͲŝŶƉĂƐƐ͕ĨůĂŐƉŝƉĞĂƐ ĂƉƉƌŽƉƌŝĂƚĞƉĞƌt^^͘ ϱ͘ WKK,ĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘ ϲ͘ ŽŶĨŝƌŵŐŽŽĚůŽŐĚĂƚĂ͘ EŽƚŝĨLJKͬ'KƚŽǀĞƌŝĨLJƚŝĞͲŝŶ ϳ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘ ϴ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚ ŽĨĨ ĂŶLJƉƌĞƐƐƵƌĞƚŽƌĞƚƵƌŶƚĂŶŬ͘<ŝůůǁĞůůǁͬ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌϴ͘ϱ ƉƉŐ ĂƐŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐƌĞͲĞƐƚĂďůŝƐŚĞĚ͘ Ύ&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚ ĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϵ͘ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐƵƉƐĂĨĞƚLJũŽŝŶƚǁŝƚŚd/tǀĂůǀĞĂŶĚƐƉĂĐĞŽƵƚďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁǁĞůů ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶ ƐƚƌŝŶŐ͘KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚ ŽƵ ƚ͕ŬĞĞƉ ƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞ ƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘ Ă͘ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞƉĞƌĨŐƵŶƐ ŽŶĞƚŝŵĞƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘ ϭϬ͘ ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨdWŐ ƵŶƐƉĞƌƐĐŚĞĚƵůĞďĞůŽǁ͘ŽŶƐƚĂŶƚůLJ ŵŽŶŝƚŽƌĨůƵŝĚ ƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ ǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϭϭ͘WĞƌĨ^ĐŚĞĚƵůĞďĂƐĞĚŽŶϮ͘Ϭ͟ DŝůůĞŶŶŝƵŵ,Dy͕ϲ͘ϴŐƌĂŵ͕ϲƐƉĨ͕ϲϬĚĞŐƉŚĂƐĞ͕ŵĂdžƐǁĞůů ŝŶůŝƋƵŝĚ Ϯ͘Ϯϯ͕͟ƉƵďůŝƐŚĞĚůŽĂĚĞĚŐƵŶǁĞŝŐŚƚŝŶĂŝƌŝƐ ϱ͘ϲ ƉƉĨ WĞƌĨ/ŶƚĞƌǀĂů WĞƌĨ>ĞŶŐƚŚ KǀĞƌĂůů'ƵŶ >ĞŶŐƚŚ ;ǁͬ>E<^Ϳ tĞŝŐŚƚŽĨ 'ƵŶ;ůďƐͿ ϵ͕ϴϲϬͲϭϬ͕Ϭϭϱ͛ŵĚ ϭϱϱ͛ϭϱϱ͛ϴϲϴ ůďƐ ϭϮ͘ DĂŬĞƵƉW͕ Z/,ǁŝƚŚƉĞƌĨŐƵŶĂŶĚƚŝĞͲŝŶƚŽĐŽŝůĨůĂŐ͘WŝĐŬƵ ƉĂŶĚƉĞƌĨŽƌĂƚĞŝŶƚĞƌǀĂůƉĞƌWĞƌĨ^ĐŚĞĚƵůĞ ĂďŽǀĞ͘ Ă͘ EŽƚĞĂŶLJƚƵďŝŶŐƉƌĞƐƐƵƌĞĐŚĂŶŐĞŝŶt^Z͘ ϭϯ͘ ĨƚĞƌƉĞƌĨŽƌĂƚŝŶŐ͕Wh,ƚŽƚŽƉŽĨůŝŶĞƌŽƌŝŶƚŽƚƵďŝŶŐƚĂŝůƚŽĞŶƐƵƌĞĚĞďƌŝƐĚŽĞƐŶŽƚĨĂůůŝŶŽŶƚŚĞŐƵŶƐĂŶĚ ƐƚŝĐŬƚŚĞ,͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚĂŶĚŬŝůů͕ŝĨŶĞĐĞƐƐĂƌLJ͕ďĞĨŽƌĞƉƵůůŝŶŐƚŽƐƵƌĨĂĐĞ͘ ϭϰ͘ WƵŵƉƉŝƉĞĚŝƐƉůĂĐĞŵĞŶƚǁŚŝůĞWKK,͘^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘<ŝůůǁĞůůŝĨŶĞĐĞƐƐĂƌLJ͘ ϭϱ͘ ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐĂŶĚ^ƚĂŶĚŝŶŐKƌĚĞƌƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚ ĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶŽĨdWŐƵŶƐƚƌŝŶŐ͘ ϭϲ͘ ŶƐƵƌĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞĂƐƐĞŵďůLJĂƌĞŽŶͲŚĂŶĚďĞĨŽƌĞďƌĞĂŬŝŶŐŽĨĨůƵďƌŝĐĂƚŽƌƚŽ>ŐƵŶ,͘ ϭϳ͘ ZDKdh͘ ϭϴ͘ ZdWŽƌ&WǁĞůů͘ DĂŬĞƵƉW͕ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ^ůŝĐŬůŝŶĞ ϭ͘ ^ĞƚϰͲϭͬϮ͟ĚƌĞĂŵĐĂƚĐŚĞƌŽŶyͲůŽĐŬĂƚϮϬϵϱ͛ŵĚ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ϲ͘dŝĞ/Ŷ>ŽŐͬWĞƌĨ^ŚĞĞƚ ϳ͘^ƵŶĚƌLJŚĂŶŐĞ&Žƌŵ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϭ͘ ƵƌƌĞŶƚt^ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ Ϯ͘WƌŽƉŽƐĞĚt^ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ZWDdĂƌŐĞƚƌĞĂ͗ ϭϭ͕ϳϬϬ͛ ʹ ϭϯ͕ϮϵϬ͛ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ ϲ͘ dŝĞ/Ŷ>ŽŐͬWĞƌĨ^ŚĞĞƚ -&53031&'-DQ3DVV8SLQFKVFDOH tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ tĞůů͗ :ͲϬϵ Wd͗ϮϭϵͲϭϰϴ +LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH 6HSWHPEHU 6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO -&6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU:2³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\,QLWLDOV+16$SSURYHG%\,QLWLDOV$2*&&:ULWWHQ$SSURYDO5HFHLYHG3HUVRQDQG'DWH$SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH DATA SUBMITTAL COMPLIANCE REPORT 3/19/2020 Permit to Drill 2191480 Well Name/No. PRUDHOE BAY UNIT J -09C Operator BP Exploration (Alaska) Inc. X62' MD 12136 TVD 9041 Completion Date 12/16/2019 Completion Status 1-0I1- Current Status 1-011- REQUIRED -OILREQUIRED INFORMATION Mud Log No ✓ Samples No ✓ API No. 50-029-20251-03-00 UIC No Directional Survey Yes ✓ DATA INFORMATION List of Logs Obtained: MWD/GR/RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 31978 Digital Data 9190 12136 1/28/2020 Electronic Data Set, Filename: J- 09C_LW D_FINAL _FIELD—COMPOSITE-1 1 DEC 2019 BHI CTK.Ias ED C 31978 Digital Data 1/28/2020 Electronic File: J- 09C_GR_Res _11 DEC2019_MD_FINAL_FIELD_ BHI_CTK.cgm ED C 31978 Digital Data 1/28/2020 Electronic File: J- 09C_GR_Res _11 DEC2019_TVDSS_FINAL_FIEL D_BHI_CTK.cgm ED C 31978 Digital Data 1/28/2020 Electronic File: J- 09C_GR_Res _11 DEC2019_MD_FINAL_FIELD_ BHI_CTK.pdf ED C 31978 Digital Data 1/28/2020 Electronic File: J- 09C_GR_Res _11 DEC2019_TVDSS_FINAL_FIEL D_BHI_CTK.pdf ED C 31978 Digital Data 1/28/2020 Electronic File: J -09C Final Field Surveys.csv ED C 31978 Digital Data 1/28/2020 Electronic File: J -09C Final Field Surveys.xlsx ED C 31978 Digital Data 1/28/2020 Electronic File: J -09C Final Survey.pdf ED C 31978 Digital Data 1/28/2020 Electronic File: J -09C Final Survey.txt ED C 31978 Digital Data 1/28/2020 Electronic File: J-09C_25_tapescan_BHI_CTK.txt ED C 31978 Digital Data 1/28/2020 Electronic File: J-09C_5_tapescan_BHI_CTK.txt ED C 31978 Digital Data 1/28/2020 Electronic File: J-09C_output.tap ED C 31978 Digital Data 1/28/2020 Electronic File: J- 09C_GR _ Res _11 DEC2019_MD_FINAL_FIELD_ BHI CTK.tif AOGCC Page l of 5 Thursday, March 19, 2020 DATA SUBMITTAL COMPLIANCE REPORT 3/19/2020 Permit to Drill 2191480 Well Name/No. PRUDHOE BAY UNIT J -09C Operator BP Exploration (Alaska) Inc. API No. 50-029-20251-03-00 MD 12136 TVD 9041 Completion Date 12/16/2019 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 31978 Digital Data 1/28/2020 Electronic File: J - 09C GR Res 11DEC2019_TVDSS_FINAL_FIEL D BHI CTK.tif Log 31978 Log Header Scans 0 0 2191480 PRUDHOE BAY UNIT J -09C LOG HEADERS Log 31979 Log Header Scans 0 0 2191480 PRUDHOE BAY UNIT J -09C PB1 LOG HEADERS- Incorrect API number, see T32043 Log 31980 Log Header Scans 0 0 2191480 PRUDHOE BAY UNIT J -09C PB2 LOG HEADERS - Incorrect API number, see T32044 ED C 32030 Digital Data 8300 10746 2/11/2020 Electronic Data Set, Filename: J- 09C_MRPM_PNC3D_RAW_PASS01 UP_14JAN2 020_BHl.las ED C 32030 Digital Data 8000 10748 2/11/2020 Electronic Data Set, Filename: J- 09C_MRPM_ PNC3D_RAW_PASS02UP_14JAN2 020_B H I .las ED C 32030 Digital Data 2/11/2020 Electronic File: J- 09C_MRPM_PNC3D_RAW_PASS01 UP_14JAN2 020 BHI.dlis ED C 32030 Digital Data 2/11/2020 Electronic File: J- 09C_MRPM_PNC3D_RAW_PASS02UP_14JAN2 020 BHI.dlis ED C 32030 Digital Data 2/11/2020 Electronic File: J- 09C_MRPM_PNC3D_RAW_14JAN2020_BH I.me to ED C 32030 Digital Data 2/11/2020 Electronic File: J- 09C_MRPM_PNC3D_RAW_14JAN2020_BH I.PD F Log 32030 Log Header Scans 0 0 2191480 PRUDHOE BAY UNIT J -09C LOG HEADERS ED C 32043 Digital Data 9190 10172 2/14/2020 Electronic Data Set, Filename: J- 09CPB1_LW D_FINAL_FIELD_COMPOSITE_02 DEC2019 BHI CTK.las ED C 32043 Digital Data 2/14/2020 Electronic File: J- 09CPB 1 _G R_Res_02DEC2019_MD_F I NAL_F I E LD_BHI_CTK.cgm ED C 32043 Digital Data 2/14/2020 Electronic File: J- 09CPB 1 _G R_Res_02DEC2019_TVDSS_F I NAL_ FIELD_BHI_CTK.cgm AOGCC Page 2 of 5 Thursday, March 19, 2020 DATA SUBMITTAL COMPLIANCE REPORT 311912020 Permit to Drill 2191480 Well Name/No. PRUDHOE BAY UNIT J -09C Operator BP Exploration (Alaska) Inc. MD 12136 TVD 9041 ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data Completion Date 12/16/2019 Completion Status 1 -OIL ED C 32043 Digital Data ED C 32043 Digital Data ED C 32043 Digital Data Log 09CPB1 GR_Res_02DEC2019_TVDSS_FINAL_ 32043 Log Header Scans 0 0 Log 2/14/2020 32044 Log Header Scans 0 0 ED C 32044 Digital Data 9190 11747 ED C 32044 Digital Data ED C 32044 Digital Data API No. 50-029-20251-03-00 Current Status 1 -OIL UIC No 2/14/2020 Electronic File: J- 09CPB 1_GR_Res_02DEC2019_MD_FINAL_FI E LD_BHI_CTK.pdf 2/14/2020 Electronic File: J- 09CPB1 GR_Res_02DEC2019_TVDSS_FINAL_ FIELD_BHI_CTK.pdf 2/14/2020 Electronic File: J-09CPB1 Final Field Surveys.csv 2/14/2020 Electronic File: J-09CPB1 Final Field Surveys.xlsx 2/14/2020 Electronic File: J-09CPB1 Final Survey.pdf 2/14/2020 Electronic File: J-09CPB1 Final Survey.txt 2/14/2020 Electronic File: J - 09C PB 1 _25_tapescan_BH I_CTK.txt 2/14/2020 Electronic File: J- 09CPB 1 _5_tapescan_B H I_CTK.txt 2/14/2020 Electronic File: J-09CPB1_output.tap 2/14/2020 Electronic File: J- 09CPB 1 _G R_Res_02DEC2019_MD_F I NAL_F I E LD BHI CTK.tif 2/14/2020 Electronic File: J- 09CPB 1_GR_Res02DEC2019_TVDSS_FINAL_ FIELD BHI CTK.t_if 2191480 PRUDHOE BAY UNIT J -09C P131 LOG HEADERS 2191480 PRUDHOE BAY UNIT J -09C P132 LOG HEADERS 2/14/2020 Electronic Data Set, Filename: J- 09CPB2_LW D_FINAL_FIELD_COMPOSITE_06 DEC2019 BHI CTK.las 2/14/2020 Electronic File: J- 09CPB2_GR_Res_06DEC2019_MD_FINAL_FIE LD_BHI_CTK.cgm 2/14/2020 Electronic File: J- 09CPB2_GR_Res_06DEC2019_TVDSS_FINAL_ FIELD_BHI_CTK.cgm AOGCC Page 3 of 5 Thursday, March 19, 2020 DATA SUBMITTAL COMPLIANCE REPORT 3/19/2020 Permit to Drill 2191480 Well Name/No. PRUDHOE BAY UNIT J -09C Operator BP Exploration (Alaska) Inc. API No. 50-029-20251-03-00 MD 12136 TVD 9041 Completion Date 12/16/2019 Completion Status 1 -OIL Current Status 1-0I1- UIC No ED C 32044 Digital Data 2/14/2020 Electronic File: J- 09CPB2_G R_Res_06DEC2019_MD_F I NAL_F I E LD_BHI_CTK.pdf ED C 32044 Digital Data 2/14/2020 Electronic File: J- 09CP62_GR_Res_06DEC2019_TVDSS_FI NAL_ FIELD_ BHI_CTK.pdf ED C 32044 Digital Data 2/14/2020 Electronic File: J-09CPB2 Final Field Surveys.csv ED C 32044 Digital Data 2/14/2020 Electronic File: J-09CPB2 Final Field Surveys.xlsx ED C 32044 Digital Data 2/14/2020 Electronic File: J-09CPB2 Final Survey.pdf ED C 32044 Digital Data 2/14/2020 Electronic File: J-09CPB2 Final Survey.txt ED C 32044 Digital Data 2/14/2020 Electronic File: J - 09C PB2_25_tapescan_BH I_CTK.txt ED C 32044 Digital Data 2/14/2020 Electronic File: J - 09C P62_5_tapescan_B H I_CTK.txt ED C 32044 Digital Data 2/14/2020 Electronic File: J-09CPB2_output.tap ED C 32044 Digital Data 2/14/2020 Electronic File: J- 09CPB2_GR_Res_06DEC2019_MD_FINAL_FIE LD BHI CTK.tif ED C 32044 Digital Data 2/14/2020 Electronic File: J- 09CP132 GR_ Res06DEC2019_TVDSS_FINAL_ FIELD BHI CTK.t_if Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Y0 Directional / Inclination Data (9 Mud Logs, Image Files, Digital Data Y / Core Chips Y / Production Test Information / Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files 0 Core Photographs Y /S Geologic Markers/Tops lY Daily Operations Summary O Cuttings Samples Y /6) Laboratory Analyses Y/9 COMPLIANCE HISTORY AOGCC Page 4 of 5 Thursday, March 19, 2020 Permit to Drill 2191480 Well MD 12136 TVD 9041 Completion Date: 12/16/2019 Release Date: 10/30/2019 Description Comments: Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 3/19/2020 ie/No. PRUDHOE BAY UNIT J -09C Operator BP Exploration (Alaska) Inc. Completion Date 12/16/2019 Completion Status 1-0I1- Current Status 1-011- Date -OIL Date Comments API No. 50-029-20251-03-00 Date: 2) UIC No AOGCC Page 5 of 5 Thursday, March 19, 2020 Winston, Hugh E (CED) From: Lastufka, Joseph N <Joseph.Lastufka@bp.corn Sent: Thursday, March 5, 2020 4:39 PM To: AOGCC Reporting (CED sponsored) Subject: POP PBU J -09C / PTD # 219-148 Hello, Please reference the following well: Well Name: PBU J -09C Permit #: 219-148 API #: 50-029-20251-03-00 Date of Test: 3/3/2020 Type of Test: IPT (Initial Production Test) Choke Size: 91 Choke Unit: Production Method: Gas Lift Duration (Hours Tested): 6 Top Reference (Top Perf MD): 10630' Bottom Reference (Bottom Perf MD): 10960' Tubing Flowing (Pressure): 220 Casing Pressure: 1845 Total Test Rate (O, G, W): 257 / 510 / 23 24 -Hour Rate (O, G, W): 1026 / 2038 / 92 Gravity (Oil, API): N/A GOR (Gas -Oil Ratio): 6745 This well began Production on Method of Operations on this date: February 22, 2020 BAJCER 0 PRINT DISTRIBUTION LIST 219148 32044 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 6, 2019 TODAYS DATE February 13, 2020 UGHES a GE company Revision COMPANY BP Exploration Alaska Inc. WELL NAME J-09CPB2 STATUS Rev 1 Replacement: FIELD Prudhoe Bay Unit API Correction COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(cDbakerhughes.com 219148 32044 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 6, 2019 TODAYS DATE February 13, 2020 Revision STATUS Rev 1 Replacement: CD Details: API Correction Rev. Requested by: --- COMPANY FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) LOGS CGM, Final Surveys) (Compass) PERSON ATTENTION 7-0F PRINTS # OF COPIES # OF COPIES J#OFCOPIES 4 4 4 4 4 BP North Slope. 0 0 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 0 0 1 0 0 Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 ExxonMobil Upstream Oil & Gas, US Conventional 0 0 0 0 —71 Attn: TDC Transaction ID: JV-2019-USONSHOR-288 FEB4 -Zulu 22777 Springwoods Village Parkway N2.2A.332 r LG.t+ ^ �� /� O V Spring, Texas 77389 �'"� 4 State of Alaska - AOGCC 0 1 1 0 0 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 0 0 1 0 0 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 �Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. 1 Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Merion Kendall TOTALS FOR THIS PAGE: 0 1 5 0 0 BHl"e-W(ER 0 PRINT DISTRIBUTION LIST urr H� a GE company COMPANY BP Exploration Alaska Inc. WELL NAME J-09CPB1 FIELD Prudhoe Bay Unit COUNTY BHI DISTRICT PRUDHOE BAY Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Riderabakerhughes.com STATUS COMPANY Rev 1 Replacement: CD ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V 1 BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 219148 32 04 3 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 2, 2019 TODAYS DATE February 13, 2020 Revision Details: API Correction Rev. Requested by: --- FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, I SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES J# OF COPIES 4 J; 1; 4 4 4 0 0 0 0 0 2 ConocoPhillips Alaska Inc. 0 0 1 Q 0 Attn: Ricky Elgarico 0 708 RECEIVEL 70 700 G Street Anchorage, AK 99501 FEB 14 2020 3 ExxonMobil Upstream Oil &Gas, US Conventional Q Q Q Q Attn: TDC Transaction ID: JV-2019-USONSHOR-288 22777 Springwoods Village Parkway N2.2A.332 Spring, Texas 77389 4 State of Alaska - AOGCC 0 1 1 Q Q Attn: Natural Resources Technician II 1333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 51 DNR -Division of Oil &Gas *** Q Q 1 Q Q Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. 1 Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Merion Kendall TOTALS FOR THIS PAGE: 0 1 5 0 0 Baker 2�1 PRINT Hughes COMPANY BP Exploration Alaska Inc. WELL NAME J -09C FIELD Prudhoe Bay Unit COUNTY North Slope BHI DISTRICT Alaska AUTHORIZED BY Dirk Zeijlemaker EMAIL Dirk.zeiilemaker(Dbakerhughes.com STATUS Final COMPANY 219148 3203© DISTRIBUTION LIST Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com to acknowledge receipt of this data. LOG TYPE RPM:PNC3D LOG DATE January 14, 2020 TODAYS DATE February 8, 2020 Revision Replacement: No Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL (Compass) PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT C 4 4 4 4 4 # OF PRINTS 1 BP North Slope. # OF COPIES # OF COPIES # OF COPIES ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) LOGS GM, Final Surveys) (Compass) PERSON ATTENTION 4 4 4 4 4 4 1 BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. � Anchorage, Alaska 99508 RECEIVE 2 Con ocoPhilli ps Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage. AK 99501 AOGCC 3 ExxonMobil, Alaska 1 Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 Baker Hughes JV-2019-USONSHOR-288 4 State of Alaska - AOGCC 1 1 Attn: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 1 Attn: Garret Brown 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter 1 0 TOTALS FOR THIS PAGE: 0 1 4 0 0 Baker 2�1 PRINT DISTRIBUTION LIST Hughes COMPANY BP Exploration Alaska Inc. WELL NAME J-09CP132 CD/DVD FIELD Prudhoe Bay Unit PRELIM COUNTY PRUDHOE BAY SURVEY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(cDbhge.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION v BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 1900 E. Benson Blvd. Anchorage, Alaska 99508 No Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 6, 2019 TODAYS DATE January 24, 2020 Revision Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, I SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 2 i ConocoPhillips Alaska Inc. I I I 1 1 Attn: Ricky Elgarico ATO 708 700 G Street (Anchorage, AK 99501 ,, 0 3 ExxonMobil Upstream Oil & Gas, US Conventional Jaye- Attn: TDC Transaction ID: JV-2019-USONSHOR-288 )1� GG 22777 Springwoods Village Parkway Y` N2.2A.332 Sprint, Texas 77389 4 State of Alaska - AOGCC 1 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division of Oil & Gas *** 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 • Baker 5�1 PRINT DISTRIBUTION LIST Hughes COMPANY BP Exploration Alaska Inc. WELL NAME J-09CPB1 FIELD Prudhoe Bay Unit CD/DVD COUNTY PRUDHOE BAY PRELIM BHI DISTRICT Alaska SURVEY AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(d�bhge.com STATUS Final Replacement.- COMPANY eplacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V 2! 91 4 8 31979 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1_112-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 2, 2019 TODAYS DATE January 24, 2020 Revision No Details: Rev. Requested by: --- FIELD I FINAL CD/DVD FINAL ;22777Springwoods Village Parkway PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) 1 1 # OF PRINTS # OF COPIES # OF COPIES J# OF COPIES 4 4 4 4 4 1 BP North Slope. Attn: TDC Transaction ID: JV-2019-USONSHOR-288 ;22777Springwoods Village Parkway EOA, PBOC, PRB-20 (Office 109) N2.2A.332 Spring, Texas 77389 D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 1 1 Attn: Natural Resources Technician II 900 E. Benson Blvd. Anchorage, Alaska 99501 Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 1 1 Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 `� /► O �, 11 do� 3 ExxonMobil Upstream Oil & Gas, US Conventional V Attn: TDC Transaction ID: JV-2019-USONSHOR-288 ;22777Springwoods Village Parkway N2.2A.332 Spring, Texas 77389 4 State of Alaska - AOGCC 1 1 Attn: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 Baker 5�1 PRINT DISTRIBUTION LIST Hughes FINAL COMPANY BP Exploration Alaska Inc. ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX WELL NAME 3-09C as, dlis, PDF, META, f(CCIGM, FIELD Prudhoe Bay Unit LOGS COUNTY PRUDHOE BAY (Compass) BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(cDbhge.COm 219148 31978 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1_112-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 11, 2019 TODAYS DATE January 24, 2020 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX PRELIM LOGS as, dlis, PDF, META, f(CCIGM, SURVEY REPORT LOGS BP North Slope. Final Surveys) (Compass) EOA, PBOC, PRB-20 (Oce 109) ffi # OF PRINTS # OF COPIES # OF COPIES # OF COPIES COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX PERSON ATTENTION V 1 BP North Slope. C EOA, PBOC, PRB-20 (Oce 109) ffi D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 1900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 ExxonMobil Upstream Oil & Gas, US Conventional Attn: TDC Transaction ID: JV-2019-USONSHOR-288 22777 Springwoods Village Parkway N2.2A.332 Spring, Texas 77389 4 State of Alaska - AOGCC Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 V ,v ,® � 1 KVA 1 % TO a 5 DNR - Division of Oil & Gas *** 1 Attn: Resource Evaluation 550 West 71h Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS }� EC E ISE REPORT OF SUNDRY WELL OPERATION - 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations-shutdd3vn 282-0 ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well Q Re-enter Susp Well ❑ Other: IA Squeeze 9 Q 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number. 219-148 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20251-03-00 7 Property Designation (Lease Number): ADL 028281 8. Well Name and Number: PBU J -09C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: Cement Evaluation PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12136 feet Plugs measured None feet true vertical 9041 feet Junk measured 10746, 10748 feet Effective Depth: measured 11087 feet Packer measured 9489 feet true vertical 9051 feet Packer true vertical 8806 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 35-115 35-115 Surface 2667 13-3/8" 34-2701 34-2701 4930 2670 Intermediate 6067 9-5/8" 33-6100 33-5749 6870 4760 Liner 3606 7-5/8" 5849-9455 5534-8778 6890 4790 Liner 2835 3-1/2" x 3-1/4" x 2-7/8" 8272-11107 7756-9053 Perforation Depth: Measured depth: 10630 - 10960 feet True vertical depth: 9031 -9044 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 30-9455 30-8778 Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): 4386'- 9445' Treatment descriptions including volumes used and final pressure: 45 Bbls Class'G' T=480 psi, IA = 500 psi, OA = 48 psi 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Shut -In Prior to well operation: No Test Available Subsequent to operation: 14. Attachments: (required per 20 AAC 25.070.25 071, &25283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Well Status after work: Oil 2 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ 16. Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-480 Authorized Name: Lastufka, Joseph N Contact Name: Allely, Josh Authorized Title: SlySpec f t Contact Email: Josh.Allely(dbp.com Authorized Signature:ll I A / � Date: 2-11e)[210 Contact Phone: +1 907 564 5732 Form 10-404 Revised 04/2017 ^tix,�0-a9z0130IMS14"✓ FEB 2 4 2020 Submit Original Only Daily Report of Well Operations PBU J-09C 'WELL SHUT IN ON ARRIVAL*** (Post CTD) RAN 4-1/2" BLB & 3.77" G-RING TO TOP OF DEPLOYMENT SLV @ 8270' SLM (8272' MD) RAN 2.85" NO-GO & 3-1/2" BLB TO X-NIP @ 8292' MD SET 3-1/2" XX-PLUG @ 8292' MD 1/30/2020 CONFIRMED PLUG SET W/ 3-1/2" CHECK SET T/1/0= 0/0/50 Temp= SI LRS unit 72 Assit SL (MIT-T) Rig up, Pressure test. ***Job 1/30/2020 continued on 01/31/2020*** ***Job continued from 01/30/2020*** LRS unit 72 Assist SL (MIT-T, CMIT-TxIA) Pumped 22 bbls crude to Fluid pack TBG. MIT-T ***PASSED*** @ 2563 psi. Pumped 3 bbls crude to reach max applied psi of 2700 with a target psi of 2500. 1 st 15 min TBG lost 19 psi. 2nd 15 min tbg lost 17 psi, Total loss of 36 psi in 30 minutes. CMIT-TxIA to 2500 psi **PASSED** at 2584 psi (2700 psi Max Applied Pressure) T/IA lost 23/15 psi during the first 15 minutes. T/IA lost 12/13 psi during the second 15 minutes (second attempt) Pumped 7.89 bbls of 52* F crude to achieve test pressure. Bled back 6 bbls to final T/1/0= 44/14/49. AOGCC (Matt Herrera witnessed) MIT-T to 2500 psi **PASSED** at 2536 psi (2700 psi Max Applied). TBG lost 112 psi during the first 15 minutes. TBG lost 66 psi during the second 15 minutes. TBG lost 178 psi during the 30 minute test (<10% per AOGCC) Pumped 1.87 bbls of 48* F crude to achieve test pressure. AOGCC CMIT-TxIA to 2500 psi **PASSED** at 2587 psi (2700 psi Max Applied). T/IA lost 50/47 psi during the first 15 minutes. T/IA lost 24/23 psi during the second 15 minutes. Pumped 6.11 bbls of 48* F crude to achieve test pressure. Bled back 4.1 bbls to Final 1/31/2020 T/1/0= 480/500/48. HES S/L had control of the well upon departure. ***CONT. FROM 01/30/20 WSR*** (Post CTD) PERFORM PASSING MIT-T (see log) PERFORM PASSING CMIT-TxIA (see log) PERFORM PASSING (AOGCC STATE WITNESS) MIT-T (see Irs wsr) PERFORM PASSING (AOGCC STATE WITNESS) CMIT-TxIA (see Irs wsr) 1/31/2020 ***GO ON WEATHER TICKET DUE TO LOW TEMPS*** ***CONT. FROM 01/31/20 WSR*** (Post CTD) RIH W/ HES MEMORY CEMENT BOND LOG TOOL, LOGGING FROM 6100'-3400' SLM 2/9/2020 ***CONT. ON 02/10/20 WSR*** ***CONT. FROM 02/09/20 WSR*** (Post CTD) GOOD DATA ON HES CEMENT BOND LOG FROM 6100'-3400' SLM SET 4-1/2" WHIDDON C-SUB @ 8270' SLM ***JOB INCOMPLETE, WELL LEFT S/I*** 2/10/2020 *******4-1/2" WHIDDON C-SUB (WCS44) LEFT IN HOLE ON DEP SLV @ 8272' MD******* Daily Report of Well Operations PBU J -09C T/1/0=0/0/50. Post CDR. RD test spool #1. RU tree cap, torqued to API specs. 1010 FT/LBS. Set 6" CIW "J" TWC #403 @ 135". TWC LTT.(PASSED) PT'd tree cap to 500 psi. 12/21/2019 (PASSED).*'"JOB IN PROGRESS***. See log for details. Final WHP's= TWC/0/50 T/I/O=TWC/0/0 Removed Kill line #1. Removed CDR Tree #1. Installed production tree that was previously removed. Torqued to API specs. R/U lubricator, PT'd through lubricator against TWC 300/low..5000/high.. 5 min each... pass. see "Field Charted Tests" Pulled 6" CIW "J" TWC #403 through tree, tagged @135" R/D lubricator, installed tree cap with new 12/22/2019 O-ring. PT'd 500 psi. FWP's = 0/0/0 see log for details. ***WELL S/I ON ARRIVAL*** (Post CTD) DRIFTED W/ 2.48" CENT, 2.25" LIB, SAT DOWN @ 9,665' SLM (marks on Iib indicate possible fill). SET 4 1/2" SLIP STOP CATCHER @ 4,493' SLM 12/30/2019 ***JOB CONTINUED ON 31 -DEC -2019*** ***JOB CONTINUED FROM 30 -DEC -2019*** (CTD) PULLED RK-DGLV FROM ST# 2 @ 4,356' MD MULTIPLE ATTEMPTS TO SET VALVE IN ST# 2 SET RK-LGLV IN ST# 2 @ 4,356' MD PULLED EMPTY SLIP STOP CATCHER FROM 4,493' SLM DRIFTED W/ 2.68" CENTRALIZER, 2.50" SAMPLE BAILER TO 9,667' SLM (1 cup of black sand recovered) 12/31/2019 ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS*** CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement MIRU. Perform weekly bop test. 1/12/2020 ***In progress*** CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement MU & RIH w/ BOT BHA. Push fish from 9745ft to 10748ft. POH - trash in wellbore. At surface L&K well 1.5x's with slick 1 %KCL +26bbl FP cap. At 1 bpm WHP leveled off at 1681psi. MU/RIH with venturi with 3.70" mule shoe. Very little if any debris retrieved. MU/RIH with 2.63" venturi for 3-1/4" liner where over pulls occurred. Experienced a few -r3- 4k overpulls through the heel area again. Made a couple venturi passes here. Continue taking -x200' bites down to flag. Dry drift from TOL - Clean. POH. MU & RIH w/ HES SCMT logging tools. 1/13/2020 CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to RIH w/ HES radial cement bond logging tools. Log well from 8200ft to 10718ft. POH. EST TOC 901 Oft. MU/RIH with Baker RPM. Log from the flag up to 7950'. Paint a flag at 8400' for subsequent CIBP. POH. LD RPM tools. Cut coil & C/O packoffs. MU LTT. 1/14/2020 ***In progress*** Daily Report of Well Operations PBU J -09C CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to RIH w/ LTT. Load well. Sting into liner top. PT Liner Lap to 2149psi - pass. POH. MU & RIH w/ HES GR/CCL. Log 6000ft to 4000ft. POH. MU/RIH with 4.5 HES obsidian CBP. Set plug ME 5244'. Circ well/IA to clean diesel. MU/RIH w/ HES Cement Retainer. Set & test retainer ME at 5180ft to 1000psi. POH. MU/RIH w/ HES stinger BHA. 1/15/2020 ***In progress*** 1/15/2020 LRS Unit 42 Heat Diesel transports #'s 39018, 30018 to 90* 1/16/2020 (LRS unit 76 - Heat diesel transport for coil) Heated diesel transport to 80*. RDMO. CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to RIH w/ HES stinger BHA. Sting into retainer and begin pumping cement. Abort cement after 21 bbls due to ABT issues. Untinsting and circulate cement out taking backside returns. Comtaminate cement with Powervis and chase out of hole. Make up 3.25" JSN and RIH. Reciprocate across cement retainer. POH. MU & RIH w/ cement retainer. Wait on fluids. 1/16/2020 CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to wait on fluids. Swapped well to diesel & test retainer - pass. Pump 45bbls of 15.8ppg class 'G' cement into IA. Est IA TOC 4440ft. POOH and wait for 500 psi compressive strength; 21 hours. 1/17/2020 ***In progress*** CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to wait on compressive strength. RIH w/ 3.7" reverse clutch mill. Mill from 5181ft to 5188ft. POH due to lack of progress. RIH w/ venturi. Reciprocate at TD. POH. 1/18/2020 ***In progress*** CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Continue to POH w/ venturi & recover plug debris. MU & RIH w/ 3.8" metal muncher. Mill from 5188ft to 5242ft. POH. MU & RIH w/ venturi burn shoe. Burn over plug from 5242ft & push to 8282ft. POH - recover some CBP debris. RIH w/ venturi to 8282ft. POH. Perform weekly BOP test. 1/19/2020 CTU #8 1.75" coil 0.156WT Objective: push guns to TD, liner lap sqz, IA cement Complete weekly BOP test. MU & RIH w/ 2.70" milling BHA. Dry tagged top of liner @ 82806, came online w/ motor and had moderate motor work getting through deployment sleeve, continued pushing plug remnants to bottom. Shut down pump @ 10,700' and pushed plug down dry until tagging top of guns @ 10747'. Circulated gel sweep and bottoms up from 10735'. POOH, freeze protected coil and well. 1/20/2020 ***Complete*** WELLHEAD =_ McEV_OY_ _ ACTUATOR = PRUDHOE BAY UNIT WELL J -09C PERMIT No: 219-148 API No: 50-029-20251-03 SEC 9, T71 N, R13E, 1248' FNL & 804' FEL _ O_K_B. ELEV = REF ELEV = -------73.97' 75.02 BF. ELEV = 4122'' KOP = --------------- ----------------- Max Angle = -- -- 2800' —94" 11516'- Datum MD = 9568' Datum TVD = 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12.347• 2700' J -09C ®❑ CONTAMINATED DIESEL/ CMT IN IA ^4300' --6220' FROM HOLES (11/16/19) TOP OF IA CMT (01/17/20) 4386' Minimum ID = 2.377"@ 10875' 3-3/16" X 2-718" XO 9-5/8' CSG, 47#, N-80, D = 8.681"6100' TOP OF 3-1/2" X 3-1/4" X 2-7/8" LNR 8272' 3-12" LNR, 9.3#, L-80 STL, .0087 bpf, ID = 2.992- 8330' - TOC (01/14/20) —9010' 4-12" BKR MONOBORE WHIPSTOCK (11/24/19) 9455' 4-12" TBG, 12.6#, L-80 NSCT, .0152 bpf, ID = 3.958^ —9455' 7-5/8" LNR, 29.7#, L-80_0459 bpf, ID = 6.875" —9455' 3-1/4" LNR, 6.6#, L-80 TC4 .0079 bpf, D = 2.850• 1087W PERFORATION SUMMARY REF LOG: BHI GR/MPR ON 12/11/19 ANGLE AT TOP PERF: 900 Q 10630' Note: Refer to Production DB for historical perf data SQE SPF INTERVAL I Opn/Sgz I SHOT I SQZ 2" 6 1 10630 -10960 1 O 12/15/19 PBTD 1108T 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441" H 11107' 12136' 2095' 1--i 4-1/2" O11S HXO SSSV NIP. ID = 3.813" 2183' 19-5/8' FOC 2687' 9-5/8" DV COLLAR GAS LIFT MANDRELS 3TJ MD I TVD I DEV I TYPE I VLV I LATCH I PORTI DATE 2 4356 4270 31 1 MMG DOME RK 16 12/31/19 1 5760 5458 32 MMG DMY RK 0 09/14/94 6849' 9-5/8• X 7-5/8• BKR PKR, D = 6.875' 6860' 9-5/8• X 7-5/8" BKR HGR, D = 6.875" 9-5/8- MLLOUT WINDOW (J -09A) 6100' - 6150' I 8272' 3.70• BKR DEPLOYMENT SLV, ID -= 3.00• 8292' 3 12• X NIP, ID = 2.813" 8330' --j 3-1/2"X 3-3/16" XO, ID = 2.786" 9427' 14-1/2' OTIS X NP (9 -CR), D = 3.813" MLLOUT WINDOW (J -09C) 9455' - 9470' 10746' FISH: MILLED & PUSHED CBP & CMT RETAINER (01 /19/20 ) 10748' FISH: MILLED & PUSHED PERF GUNS (01/13/201 10875' -- 3-3/16" X 2-7/8" XO, ID = 2.377' PRUDHOE BAY UNIT WELL J -09C PERMIT No: 219-148 API No: 50-029-20251-03 SEC 9, T71 N, R13E, 1248' FNL & 804' FEL DATE REV BY COMMENTS DATE REV BY COMMENTS 08119!77 RWN 26 INITIAL COMPLETION 01/06/20 GJB/JMD GLV C/O (12/31/19) 09/09194 D44 SIDETRACK (J -09A) 01/28/20 MR/JMD SET FISH & RAN CMT 04/14/13 NORDIC 1 CTD SIDETRACK (J -09B) 02/18/20 JNL/JMD CORRECTED IA TOC PER LOG 12116/19 JH/JMD+ CTD SIDETRACK (J -09C) 12/18/19 JMD DRLG HO CORRECTIONS BP Exploration (Alaska) 12/30/19 JH/JMD FNAL ODE APPROVAL STATE OF ALASKA 4LASKA OIL AND GAS CONSERVATION COMMIS` IN WELL JIMPLETION OR RECOMPLETION REPC AND LOG DECEIVED o R agn 1a. Well Status: Oil 0 - Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development 0Exploratory [IGINJ ElWINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Service ❑ Stratigraphic Test ❑ 2 Operator Name: 6. Date Comp., Susp., orAband.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 12/16/2019 219-148 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 11/29/2019 50-029-20251-03-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 12/10/2019 PBU J -09C 9 Ref Elevations KB 75.02 17. Field/Pool(s): Surface: 1248' FNL, 804' FEL, Sec. 09, T11N, R13E, UM Top of Productive Interval: 2460' FNL, 2915' FEL, Sec. 09, T11N, R13E, UM GL 41.16 • BF 41.22 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 3170' FNL, 864' FEL, Sec. 09, T11 N, R13E, UM . 11087'/9051' • ADL 028281 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 643559 y- 5970105 Zone - ASP 4 12136'/ 9041' 85-24 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/TVD: TPI: x- 641473 y- 5968854 Zone - ASP 4 Total Depth: x- 643539 y- 5968183 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9455'/ 8778' 22 Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD / GR / RES 23' CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" x 30" 35' 115' 35' 115' 36" 213 cu ft Cement 13-3/8" 72# N-80 34' 2701' 34' 2701' 17-1/2" 4172 cu ft Permafrost ll, 97 cu ft Permafrost II 9-5/8" 47# N-80 33' 6100' 33' 5749' 12-1/4" 1177 cu ft Howcol-ite, 250cu ft Class'G', 135 cu ft PF'C' 7-5/8" 29.7# L-80 5849' 9455' 5534' 8778' 8-1/2" 36 BbIs Class'G' 3-1/2"x3-1/4' 9.3#/6.6# L-80 8272' 11107' 7756' 9053' 4-1/4" 106 sx Class'G' x2-7/8" 6.5# 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation GRADE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number, Date Perfd): 4-1/2" 12.6# L-80 9455' 2" Gun Diameter, 6 spf 12/15/2019 10630'- 10960' 9031'- 9044' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. t I � Y , EON r'OMP � Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed Yes El No 0 information nDhTFY DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2250' Freeze Protect w/ 34 Bbls Diesel, 3 Bbls Meth 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Oil -Bbl Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Test Period -.► Flow Tubing Press Casinq Press: Calculated 24 Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr): Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only ?1v,10 M4*14zA1,,* 13BDMS_L4_&/JAN 10 2020 - - ``' G 28. CORE DATA Conventional Core(s) Yes ❑ No Q Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize ahology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly, summarizing test results. Attach Top of Productive Interval 9638' 8935' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. 23SB - Zone 2B 9505' 8819' 22TS 9565' 8873' 21 TS - Zone 2A 9638' 8935' Zone 1 B 9739' 9000' Zone 2A (Fault) 10155' 9027' Zone 1 B 10962' 9044' Formation at total depth: Zone 1 B 10962' 9044' 31. List of Attachments: Summary of Daily Drilling Reports, Surveys, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Sperry, Nathan Authorized Title: M pecia Contact Email: Nathan.Sperry@bp.com Authorized Signature: Date: �� Contact Phone: 907-564-4258 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15, The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20, Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071, Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only TREE = 9455' 1/2" TBG, 12.6#, L-80 NSCT, .0152 bpf, D = 3.958' DEV TYPE VLV WELLHEAD = McEVOY J -09C 2 OKB_ ELEV = 73.97' 31 M G DO RK REF ELEV = 75.02 1 5760 BE. ELEV = 41.22' RK 0 KOP = 2800' O Datum MD = 9568' Datum TVD = 8800' SS 13-3/8" CSG, 72#, N-80, D = 12.347"2700' CONTAMINATED DIESEUCMT IN U1 -4300'- 5220' FROM HOLES (11/16/19) ESTTOP OF IA CMT(11/16/19) . ^ 5640' Minimum ID = 2.377" @ 10875' 3-3/16" X 2-7/8" XO 9-5/8" CSG, 47#, N-80, ID = 8.681 OF 3-1 /2' X 3-1/4" X 2-78' LNR 1--j 8272' 3-1 /2- LNR, 9.3#, L-80 STL, _0087 bpf, D = 2.992' 8330' 4-1/2" BKR MONOBORE WHIPSTOCK (11/24/19) 9455' 1/2" TBG, 12.6#, L-80 NSCT, .0152 bpf, D = 3.958' DEV TYPE VLV 7-5/8' LNR, 29.7#, L-80, .0459 bpf, D = 6.875' "9455' TOc 9900' 3-1/4- LNR, 6.6#, L-00 TCI, .0079 bpf, ID = 2.850' I 10875' PERFORATION SUMMARY REF LOG: BHI GR/MPR ON 12/11/19 ANGLE AT TOP PERF: 90° @ 10630' Note: Refer to Production DB for historical perfdata SIZE SPF INTERVAL I O rdS z I SHOT I SQZ 2" 6 10630 -10960 1 O 12/15/19 PBTD 11087' 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441" 1110T ® 12136' SAFI Y NOTES: WELL ANGLE 700 @ -9756'. *** k OME NIPPLE "* 11 2096' 1--�4-1/2" OTIS SSSVN, D = 3.813" 2183' 9-5/8" FOC 268 9 5/8" DV COLLAR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4356 4270 31 M G DO RK 16 05/16/13 1 5760 5458 32 MVIG DMY RK 0 09/14/94 6849' 19-5/8" X 7-5/8" BKR PKR, D = 6.875" 6860'—E9 --5/8"X7-5/8' BKR HGR, ID = 6.875-- 9-5/8- MILLOUT WINDOW (J -09A) 6100' - 6150' 8272' 3.70' BKR DEPLOYMENT SLV, D = 3.00' 8330'3-12' X 3-3/16" XO, ID = 2.786' 9427' 1-14-1/2" OTIS X NIP (9 -CR), D = 3.813" MILLOUT WINDOW (J -09C) 9455' -9470' 1 10875' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/19/77 RWN 26 INITIAL COMPLETION 09/09194 0-14 SIDETRACK(J-09A) 04/14/13 NORDIC 1 CTD SIDETRACK(J-09B) 12/16/19 JH/JMD+ CTD SIDETRACK (J -09C) 12/18/19 JMD DRLG HO CORP ECTIONS 12/30/19 JH/JMD I FINAL ODE APPROVAL 3-3/16'X 2-7/8" XO, ID = 2.377" PRUDHOE BAY UNIT WELL: J -09C PERMIT No: 219-148 API No: 50-029-20251-03 SEC 9, T11 N, R1 3E, 1248' FNL & 804' FEL BP Exploration (Alaska) Printed 1/7/2020 10:1342AM ''All depths reported in Drillers Depths" North America - ALASKA - BP Page 1 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 11/27/201 019 00 1800 8.00 RIGU P PRE RIG MOVE -MOVE RIG FROM F PAD TO J PAD. -GET SUB CLOSE WITH TRUCK THEN USE STOMPER TO MOVE OVER WELL. -MOVE PITS IN WITH TRUCK. ACCEPT RIG AT 18:00. 18:00 2200 4.00 RIGU P PRE RIG UP -SAFE OUT RIG AND WORK ON RIG UP CHECKLIST -SERVICE TREE VALVES AND TANGO VALVES -LEAK TIGHT TEST SWAB AND MASTER VALVES TO 3500 PSI " RIG ACCEPT AT 1800 HRS " 2200 0000 2 00 RIGU P PRE RIG UP -CONTINUE WORK ON RIG UP CHECKLIST _ -INSTALL MPD LINE 11/28/2019 0000 0530 5 50 BOPSUR P PRE NIPPLE UP NIPPLE UP BOPE. FLUID PACK REELAND SURFACE LINES WITH FRESH WATER -CALIBRATE MICROMOTIONS -VALVE CREW TORQUE UP TREE -PURGEAIR FROM LINES -SHELL TEST BOPE 3500 PSI. NOTE: HOLD PRE SPUD MEETING WITH MICAH BUSH'S CREW NOTE: HOLD TABLE TOP FIRE DRILLAND EVACUATION WITH MICAH BUSH'S CREW WITH SIMULATED FIRE COMING FROM ENGINE TURBOS. Printed 1/7/2020 10:1342AM ''All depths reported in Drillers Depths" North America - ALASKA - BP Page 2 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 05:30 - 13:00 7.50 BOPSUR P PRE INITIAL BOPE TEST TO BP / AOGCC CRITERIA ALL TESTS 250 PSI LOW/ 3500 PSI HIGH 13.00 14.30 1.50 14:30 1500 0.50 15:00 16:00 1.00 i BOPSUR P i BOPSUR P BOPSUR P 16:00 - 18:00 2.00 BOPSUR P 18.00 - 2000 2.00 STWHIP P I 9,45600 Printed 1/7/2020 10 13.42AM **All depths reported in Drillers Depths** AOGCC WITNESS WAIVED BY LOU LAUBENSTEIN -7-1/16" ANNULAR, BLIND/ SHEAR, 2-3/8" PIPE / SLIP, MUD X, 2-3/8" x 3-1/2" VARIABLE, 2-3/8" PIPE / SLIP - ALL TESTS 250 PSI LOW / 3500 PSI HIGH FOR 5 MIN EACH TEST 1: IRV, PACKOFF, C9 BACKWARD, C10 BACKWARD - PASS - TEST 2: MASTER, BLIND / SHEAR, R1, BOA, B1, B4 - PASS - TEST 3: ANNULAR (2-3/8"), TIW#1, B3, B2, BL1 - PASS - TEST 4: UPPER 2-3/8" PIPE / SLIP, TIW#2, BL2, R2, T2, C15 -PASS - TEST 5: C16, T1, C11 - T1 FAIL- CYCLE T1 AND RETEST - PASS TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 PASS TEST 7: LOWER 2-3/8" PIPE/ SLIP, C5, C6, C8, TV1 - PASS TEST 8: CHOKE A, CHOKE C - PASS - PERFORM ACCUMULATOR DRAW DOWN TEST -PASS ANNULAR & B1 USED FOR BLIND SHEAR TEST 9: ANNULAR (3-1/2"), C1, C4 - PASS TEST 10: VARIABLE (3-1/2") C2, C3 - PASS PRE BOP TEST COMPLETED RD TEST EQUIPMENT SWAP OUT LUBRICATORS STRAP STACK MEASUREMENTS INSTALL BHI FLOATS PRE UQC HAS BAD THREADS AND NEEDS TO BE REPLACED PRE PRESSURE TEST PT LUBRICATOR AND BHI FLOATS GOOD PT PRE WELL OPS - FLUID PACK MPL WITH METH TO OPEN UP TO THE WELL AND FILL THE WELL TO FLOW CHECK PUMPED 8 BBLS AND METH PUP IS EMPTY SWAP METH PUPS AND FILL THE WELL. -FLOW CHECK GOOD -DISPLACE COIL WITH 10 BBLS OF METH AND AND 45 BBLS OF HEATED 1% KCL -PURGE LUBRICATORS WHILE DISPLACING COIL -FLOWCHECK FOR 10 MINUTES STATIC WEXIT MAKE UP 3.80" MILLING BHA #1 HOLD PJSM WITH CREW MILL 3.80" GO / 3.79" NO GO PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 0300 HRS NOTE HOLD KICK WHILE TRIPPING DRILL WHILE MAKING UP BHA WITH RICK ROY'S CREW. WELL SECURED IN 35 SECONDS. EXCELLENT RESPONSE BY CREW. AAR HELD WITH CREW Printed 1/7/2020 10 13.42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 3 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) - (usft) 120:00 00:00 J 4.00 STWHIP P 9,456.00 WEXIT RIH WITH 3.80" MILLING BHA #2 11/29/2019 0000 - 12.00 1200.STWHIP P I 1200 - 2045 8.75 STWHIP P i 2045 - 0000 3.25 STWHIP P 11/30/2019 00 00 - 03 00 3.00 STWHIP P Printed 1/7/2020 101342AM **All depths reported in Drillers Depths" - RATE: 0.50 BPM IN, 0.95 BPM OUT. CIRC PRESSURE: 795 PSI PUMPING HEATED SLICK 1% KCL MUD WEIGHT: 8.37 PPG IN, .8.26 PPG OUT TAKING RETURNS TO TIGER TANK - TIE IN FROM 9300' TO 9370' (CORRECTION -28) -DISPLACE TO QUICK DRILL N WITH 6% KCL 8 8 PPG PUMPING AT 4.01 BPM IN / 3.98 BPM OUT AT 2598 PSI WHILE RUNNING TO BOTTOM -WITH QUICK DRILL N ALL THE AROUND, STOP PUMPS AND CLOSE EDC TAG WHIP STOCK (PINCH POINT) W/O PUMPS AT 9456.98' 9,463.00 T WEXIT MILL WINDOW FROM 9456.9' TO 9463 RATE BPM IN 2.72 OUT 2.73 FREE SPIN 2634 PSI PU 52 SO 27 MUD WEIGHT 8.78 PPG IN, 8.6 PPG OUT ECD 9.78 TAG @ 9456.5 AND START MILLING WINDOW WOB 1-4 9,470.50 WEXIT MILL WINDOW FROM 9463" TO 9470.5' RATE BPM IN 2.92 OUT 2.99 FREE SPIN 2634 PSI CIRC PRESSURE 2854 PSI MUD WEIGHT 8.72 PPG IN, 8.53 PPG OUT ECD 9.83 WOB 3.0 - 4.5K -AT 9470.5' BOTTOM OF WINDOW PICK UP TO TOP OF WHIPSTOCK CLEAN AND RUN BACK TO BOTTOM NOTE: SAMPLE FROM 9467.5 SHOWED 30% CHERT NOTE SAMPLE FROM 9470.5 SHOWED 50% CHERT 9,472.80 WEXIT MILL RATHOLE FROM 9470.5' TO 9472.8 2.81 BPM IN/ 2.86 BPM OUT MUD WEIGHT 8.71 PPG IN / 8.72 PPG OUT PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. 9471 SAMPLE IS 60% FORMATION. PULL OFF BOTTOM THROUGH WINDOW CLEAN AND GO BACK TO BOTTOM .-OBSERVE 50 PSI MOTOR WORKAT TOP OF WINDOW TRANSITION 9,473.00 WEXIT I MILL RAT HOLE FROM 9472.8 TO 9473' -2.81 BPM IN/ 2.86 BPM OUT -MUD WEIGHT 8.71 PPG IN / 8.72 PPG OUT -PUMP MULTIPLE SWEEPS -PERFORM REAMING PASS FROM 9450'-9473' -CLEAN -PERFORM DRY DRIFT -CLEAN -DYNAMIC FLOW CHECK -LOSING AT 6 BPH -PIANT FLAG AT 9446.5' (9328.11' EOP) NOTE: ATTEMPT VARYING WOB AND PUMP RATES TO INCREASE ROP WITH NO 'SUCCESS Printed 1/7/2020 101342AM **All depths reported in Drillers Depths" Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 4 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Site: J Project: PBU Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 03:00 06:30 3.50 - ---- 9,473.00 —' POOH PUMP 4.0 / 3.3 BPM AT 3275 PSI. -MW = 8.5 / 8.65 PPG IN / OUT. -FLOW CHECK WELL -STATIC -HOLD PJSM FOR BHA HANDLING INJECTOR OFF AT 0530 HRS BLOW DOWN DRILLING CHOKE AFTER MILLING WINDOW. INSPECT LAST 50' OF COIL - GOOD STAND BACK WINDOW MILLING BHA INSPECT MILLAND STRING MILL WINDOW MILL IS WORN DOWN TO THE MATRIX ON THE FACE AND PART OF THE GAUGE (3.79 GO 3.78 NO GO) DISCUSS OPTIONS WITH WSUPT (MURPHY) AND ODE MU RERUN GAUGE WINDOW MILLAND STRING MILL INJECTOR ON AT 06:30 HRS TEST QTS TO 3500 PSI AND RIH 06 30 0900 2.50 STWHIP P 9,473.00 WEXIT RIH LOG TIE IN FROM 9340' CORRECT DEPTH -33', CLOSE EDCAND RIH 09 00 13 00 4.00 STWHIP P 9,479.00 WEXIT MILLING OPS DRY DRIFT TO TAG, TAG ON DEPTH AT TD PU, START MOTOR AND CONTINUE MILLING RAT HOLE, DD ONLY WANTS 5' MORE RAT HOLE RATE = 2.80 IN 2.84 OUT MW 8.74 IN 8.55 OUT WOB = 2.25 ECD = 9.81 PPG - MILLED TO 9479', BACKREAM AS PER PLAN, SHUT DOWN PUMP AND DRY DRIFT - REAM PASSES & DRY DRIFT ARE CLEAN, FLOW CHECK AND POOH - FLOW CHECK AT SURFACE, GOOD NO FLOW, PU INJECTOR AND INSPECT COIL - FOUND 2 DEEP GOUGES ON THE COIL 10' FROM TAGGING UP THAT WILL NEED TO BE CUT OUT AND REHEAD —INJECTOR OFF AT 112:40- 2:40***13:00 13 0016:00 3.00 STWHIP P 9,479.00 WEXIT REHEAD OPS - BHA OOH, CHECK FLUID LEVEL IN STACK AND WE CAN SEE A LARGE WAFFER OF METAL STICKING OUT OF THE CHOKE OUTLET - CLOSE THE SWAB AND SEE IF WE CAN REMOVE IT WITH THE VACUUM LINE AND A STINGER - RETRIEVED 5.5" WAFFER OF STEEL FROM THE STACK, CUT COIL 11' AND REHEAD PT THE CTC AND BHI UCC GOOD PT, PT THE BHI FLOATS GOOD PT, RACK BACK THE INJECTOR TO MU THE BHA Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America -ALASKA - BP Operation Summary Report Page 5 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Site. J Project: PBU Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:00 19:30 3.50 DRILL P 9,479.00 PROD1 BHA MU MU THE BUILD BHA WITH A4-1/4" BI -CENTER i BIT —INJECTOR ON AT 16:30*** - RIH -1.0 BPM IN / 1.41 BPM OUT -TIE IN FROM 9280' TO 9318- CORRECTION -34' CLOSE EDC -50K UP WT / 24 DN WT PASS THROUGH WINDOW AT 200° TOOL FACE WITH NO PUMPS AT 20 FPM CLEAN 19:30 00 00 4.50 DRILL P 9,750.00 PROD1 DRILL 4-1/4" BUILD SECTION FROM 9479' TO 9750' FREE SPIN:3100 PSI, RATE: 2.79 BPM IN, 2.86 BPM OUT. CIRC PRESSURE:3125 – 2700 PSI MUD WEIGHT: 8.74 PPG IN, 8.76 PPG OUT, WINDOW ECD: 10 PPG - ROP: 75-200 FT/HR, WOB: 2-3.7 KLBS 12/1/2019 0000 03 15 3.25 DRILL P9, 980.00 PROD1 DRILL 4-1/4" BUILD SECTION FROM 9750' TO 9980' - FREE SPIN: 2992 PSI, RATE: 2.70 BPM IN, 2.74 BPM OUT. CIRC PRESSURE:2990 – 3000 PSI MUD WEIGHT: 8..8 PPG IN, 8.76 PPG OUT, WINDOW ECD: 10.2 PPG - ROP: 75-150 FT/HR, WOB: 2-3.7 KLBS -PUMP 5X5 BBL LO/HI VIS SWEEP TIMED TO BE AT BIT AT AT SECTION TD OF 9980' NOTE:PERFORM WIPER TRIP TO JUST BELOW WINDOW AT 9852' NOTE: MAINTAINING A 10.0 PPG ECD AT WINDOW Printed 1/7/2020 10,13.42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 6 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Daterrime: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code 1 NPT Total Depths e Description of Operations (hr) (usft) L7 _ 03:15 09:30 6.25 DRILL P 9,980.00 PROD1 BUILD LANDED, POOH FOR LATERAL BHA RATE: 2.7 BPM IN, 2.5 BPM OUT. CIRC PRESSURE: 2975 PSI PERFORM 30 FT JOG BELOW WINDOW. PULL THROUGH WINDOWAT MIN PUMP RATE AND OPEN EDC. -CLEAN i INCREASE RATE TO 4 BPM AT 3500 PSI TIE IN LOG FROM 9282'-9322' CORRECTION +3' - CCL LOG FROM 9140'- 9360'P & C DEPTH. JET TRAY AND TIE IN RA MARKER IN WS PUMP 5 BBL HI VIS FOLLOWED BY 9.8 PPG I FLUID DOWN COIL CLOSE EDC RBIH TO BOTTOM WITH 9.8 PPG FLUID 10 BBLS OUT OF BIT POOH TO WINDOW MAINTAINING A 10.1 PPG ECD AT WINDOW I NOTE: MAINTAINING A MINUMUM 10.0 PPG ECDAT WINDOW NOTE: RA MARKER IN WHIPSTOCK TIE IN AT 9462.5 - OPEN EDC AND POOH DISPLACING WELL TO 9.8 KWF FLOW CHECK AT SURFACE GOOD FC, INSPECT PIPE AND LD BHA MU LATERAL BHA, SHALLOW TEST AGITATOR AT 2.0, 2.5 AND 2.9 BPM GOOD VIBRATION FROM AGITATOR 09.30 14:30 500 DRILL P 9,980.00 PROD1 TRIPPING OPS RIH, LOG TIE IN, CORRECT DEPTH -29' RIH TO BOTTOM OF BUILD AND DISPLACE 9.8 WITH 8.7 MUD - PULL INTO CASING, OPEN EDC AND DISPLACE AT HIGHER RATE, INCREASING RATE AS THE EDC DROPS, HOLDING -10.3 ECD AT THE WINDOW 14.30 20:15 5.75 DRILL P 10,172 00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 9984' TO 10172' FREE SPIN: 3246 PSI, RATE: 2.72 BPM IN, 2.76 BPM OUT CIRC PRESSURE: 3246 - 3462 PSI MUD WEIGHT: 8.87 PPG IN, 8.68 PPG OUT, WINDOW ECD: 10.05 PPG ROP: 80 FT/HR, WOB: 2.2-3.4 KLBS -ATTEMPT VARYING RATES AND WOB, UNABLE TO BUILD INC. Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:00AM Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task (hr) 20:15 - 00:00 3.75 DRILL Page 7 of 25 Rig Release: BPUOI: USA00000374 Code NPT Total Depth Phase Description of Operations (usft) N 10,172.00 PROD1 POOH FOR DIRECTIONAL CONTROL ISSUES -WIPER TRIP - PUMP 10 BBL HI VIS FOLLOWED BY 9 8 PPG FLUID DOWN COIL -WITH 20 BBLS OF 9.8 PPG FLUID PUMPED (STILL IN COIL) START PACKING OFF AND HAVING OVERPULLS AT 10060', -SWAP BACK OVER TO 8.8 PPG QUICK DRILL N -GET FREE UP AND TRY TO GO BACK DOWN, STACKING OUT 10020-10040 WORK TO BOTTOM. PERFORM WIPER TRIP -TIGHT AND PACKING OFF AT 10030 -10060' WORKTHROUGH -PUMP ADDITIONAL 10X10 LO/HI VIS SWEEP -REDUCE PUMP RATE THROUGH WINDOW WITH 3K DRAG OPEN EDC -INCREASE PUMP RATE TO 4 BPM -JET TRAY WITH SWEEP COMING OUT EDC -HOLE UNLOADED 1/4" TO 1/2" SHALE PIECES FOR EXTENDED AMOUNT OF TIME WITH COIL ABOVE WINDOW STARTING ABOUT 60 BBLS AFTER WIEGHTED SWEEP CAME TO SURFACE AND DID NOT CLEAN UP UNTIL HI VIS SWEEP WAS OUT OF HOLE..ESTIMATE 1-2 BBLS OF SHALE CUTTINGS.CIRCULATE UNTIL CLEANED UP. NOTE: DISCUSS RESULTS WITH ODE AND SUPERINTENDENT .-RBIH -PUMPING AT 0.55 BPM IN / 0.62 BPM OUT -OBSERVE 2-3K BOBBLES STARTING AT 9880' -4K BOBBLES AT 10036-10048, 10092' MAKE IT TO TO, -START WIPING BACK TO 9895' OBSERVE DRAG AND PACK OFFS AGAIN AT 10060' WORK THROUGH AND MAKE IT TO 9885' DISCUSS RESULTS WITH ODE AND HEAD BACK TO BOTTOM TO REPEAT SWEEPS AND PULL TO ABOVE WINDOW. RECCOMEND SETTING BILLETAND SIDETRACKING. -START PUMPING 10 BBL HI VIS, 20 BBL 9.8 PPG WEIGHTED SWEEP FOLLOWED BY ANOTHER 10 BBL HI VIS. -RIH WITH STACKOUTS AND PACK OFFS STARTING AT 9975'-10025' -DISCUSS WITH ODE AND WITH SWEEP OUT OF BIT PULL TO WINDOW FROM 10000' Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 8 of 25 Operation Summary Report Common Well Name: J-09 - Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J f Rig Name/No.: CDR -2 Spud Daterrime: 7/18/1977 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/2/2019 00:00 01:00 1.00 DRILL N 10,172.00 PROD1 WIPER TRIP -REDUCE PUMP RATE THROUGH WINDOW WITH 3K DRAG -OPEN EDC -INCREASE PUMP RATE TO 4 BPM JET TRAY WITH SWEEP COMING OUT EDC -CONTINUE TO PUMP UNTIL SWEEPS ARE OUT OF HOLE -DISPLACE WELL TO 9.8 PPG FLUID -WITH 30 BBLS OF 9.8 OUT OF EDC START PULLING OUT OF HOLE NOTE: SWEEP BROUGHT BACK A LARGE AMOUNT OF SHALES MOSTLY IN THE 1/4" RANGE 01:00 03:15 2.25 DRILL N 10,172.00 PROD1 'POOH FOR HOLE STABILITY ISSUES -PUMPING 4.13 BPM IN / 3.81 OUTAT 70 FPM -FLOW CHECK FOR 10 MINUTES STATIC '-HOLD PJSM FOR HANLDING BHA_ 03:15 07:00 3.75 DRILL N 10,172.00 PROD1 BHA HANDLE -INSPECT LAST 150' OF COIL -GOOD -INJECTOR OFF AT 0330 HRS !-CHECK SCRIBE AND EXTERNAL CORRECTION -GOOD BREAK OUT BIT -LAY DOWN USR, DGS, HOT, MOTOR -CHECK INTERNAL TOOL CORRECTION -MAKE UP COIL TRACK TOOLS FOR BILLET RUN AND HANG IN MAST. NOTE -RECOVERED 1" X 2" PIECE OF WINDOW CUTTING ON P & C MAGNET NOTE: MONITORING HOLE WHILE OUT OF HOLE 07:00 14:00 7.00 WHIP N 9,650.00 PROD1 BILLET OPS PJSM TO MU THE BILLET TO COILTRACK MWD MU BILLET, VERIFY BILLET OD, SCRIBE AND HS OF BILLET INJECTOR ON AT 07:30, RIH LOG TIE IN, CORRECT DEPTH -32', 47K UP WT, 28K RIH WT, CLOSE THE EDC EDC IS CLOSED RIH, TAG AT 9472' WITH -6.5k DOWN AND -4.2K CALL ODE AND DISCUSS OPTIONS ORIENT BILLET IN 90° INCREMENTS WITH A MAX OF 10K DOWN WE MANAGED TO PUSH OUR WAY THROUGH THE WINDOWAT90° ROHS, AS WE PUT WT DOWN IT WOULD GIVE IT BACK MADE IT DOWN TO SET DEPTH CLEAN, PU WT = 50K, RIH TO 9662.4', PU TO 45K AND SET TOB AT 9650' BILLET SHEARED AT 3450 PSI SET DOWN 6K WITH NO MOVEMENT, PU OFF BILLET AND POOH TO WINDOW FLOW CHECK WELLAND POOH FLOW CHECKAT SURFACE _LD BILLET SETTING TOOL _INJECTOR OFF AT 13:15 Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @75.02usft (above Mean Sea Level) Rig Release: BPUOI: USA00000374 Page 9 of 25 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations — (hr) (usft) 14:00 - 16:30 2.50 DRILL N 9,650.00 PROD1 BHA& RfH OPS MU THE MWD WITH BUILD MOTOR AND RERUN BIT INJECTOR ON AT 14:15 RIH 16:30 LOST COMMS WITH TOOL 16:30 19:00 1 2.50 DRILL N 9,650.00 PROD1 POOH FOR P&C FAILURE '-CIRCULATE ACROSS THE TOP AT 1 BPM IN / 0.58 BPM OUT. -FLOW CHECKAT SURFACE FOR 10 MINUTES STATIC -HOLD PJSM FOR BHA HANDLING 19.00 20:30 1.50 DRILL N 9,650.00 PROD1 BHA OPERATIONS -INSPECT LAST 50' OF COIL -GOOD -INJECTOR OFF AT 1920 HRS -SWAP OUT COIL TRACK TOOLS AND MAKE UP SAME MOTOR AND BIT. INJECTOR ON AT 2000 HOURS -TEST QTS TO 3500 PSI -GOOD -SURFACE TEST COIL TRACK TOOLS 20.30 0000 3.50 DRILL i N 9,650.00 PROD1 RIH 12/3/2019 0000 - 00:30 0.50 DRILL 00:30 - 03:30 3.00 DRILL -PUMP AT 0.1 BPM IN / 0.57 BPM OUT -TIE IN FROM 9280'-9318', CORRECTION -36' -CLOSE EDC AND ORIENT 180° -RUN THROUGH WINDOW CLEAN -JUST ABOVE BILLET AT 9635' START TO DISPLACE WELL BORE TO 8.8 PPG QUICK I DRILLAT 2 BPM AND PULL UP HOLE, REDUCE PUMP RATE TO 0.25 BPM IN AND PULL THROUGH WINDOW. OPEN EDC AND FINISH DISPLACING WELL N 9,650.00 PROD1 RIH -CLOSE EDC AND RIH THROUGH WINDOW NO PUMP ORIENTATED AT 180° -CLEAN -RIH WITH PUMPS AT MIN RATE TURN PUMPS OFF AT 9630' AND TAG AT 9650' -PICK UP TO 9630 AND BRING PUMPS UP TO 2.71 BPM -ORIENT TO 20° LAND RIH SLOWING TO VA MINUTE AT 9648', OBSERVE WOB AT 9649.55 N 9,701.00 PROD1 DRILL SIDETRACK/ BUILD SECTION DRILL 4-1/4" BUILD SECTION FROM 9650' TO 9701' - FREE SPIN: 2800 PSI, RATE: 2.72 BPM IN, 2.76 BPM OUT CIRC PRESSURE: 2860 – 3000 PSI MUD WEIGHT: 9.0 PPG IN, 8.9 PPG OUT, WINDOW ECD: 10.00 PPG -START AT DRILLING AT 1 FOOT PER HOUR -INCREASE ROP GRADUALLY UNTIL 9665' THEN -INCREASE WOB TO 1.5K -3K -PERFORM WIPER TRIP FROM 9701 TO 9610' REDUCING PUMP RATE TO 0.25 BPM WHEN PULLING ACROSS THE BILLET. RUN BACK IN HOLE WITH NO PUMPS ACROSS BILLET -CLEAN BOTH WAYS Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 10 of 25 Common Well Name: J-09 FREE SPIN: 2856 PSI, RATE: 2.73 BPM IN, 2.76 BPM OUT Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 -WOB 2.5K -3.5K Project: PBU Site: J _ WINDOW ECD: 1.0.06 PPG r Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. CHASING PILLS BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) THROUGH BILLETAND WINDOW Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 03:30 - 10:00 6.50 DRILL N 9,980.00 PROD1 DRILL 4-1/4" BUILD SECTION FROM 9701' TO INJECTOR OFF AT 13:50 FUNCTION TEST BOPE 9980' Printed 1/7/2020 10 13.42AM **All depths reported in Drillers Depths" FREE SPIN: 2856 PSI, RATE: 2.73 BPM IN, 2.76 BPM OUT CIRC PRESSURE: 2860 - 3000 PSI -WOB 2.5K -3.5K MUD WEIGHT:8.97 PPG IN, 8.9 PPG OUT, _ WINDOW ECD: 1.0.06 PPG r 10:00 15:15 5.25 DRILL N 9,980.00 PROD1 POOH OPS - BUILD LANDED, POOH TO THE WINDOW CHASING PILLS DROP PUMPS TO MIN RATE PULLING THROUGH BILLETAND WINDOW OPEN EDC AND PUMPA BOTTOMS UPAT MAX RATE TIMING 9.8 AT THE EDC AT BOTTOMS UP POOH LAYING IN 9.8 KWF PJSM & FLOW CHECKAT SURFACE GOOD NO FLOW, PU INJECTOR AND SWAP BHA'S INJECTOR OFF AT 13:50 FUNCTION TEST BOPE DEPLOY BHA, STAB ON AND RIH INJECTOR ON AT 15:05 SHALLOW HOLE TEST AGITATOR - GOOD TEST AT 2.2, 2.5 & 2.9 BPM 15 15 1945 4 50 DRILL N 9,980.00 PROD1 RIH OPS RIH, LOG TIE IN, CORRECT DEPTH -35' -CLOSE EDC AND ORIENT 180° -RUN THROUGH WINDOW CLEAN -ORIENT TO 20° LEFT AT O PUMP RATE AT PASS BILLET CLEAN START TO DISPLACE WELL BORE TO 8.8 j PPG QUICK DRILLAT 2 BPM AND PULL UP HOLE, REDUCE PUMP RATE TO 0.25 BPM AT BILLET AND WINDOW -OPEN EDC AND FINISH DISPLACING WELL -CLOSE EDC AND ORIENT 180° -RUN THROUGH WINDOW CLEAN -ORIENT TO 20° LEFT PASS BILLET CLEAN 1945 23:30 3.75 DRILL N 10,172.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 9980' TO 10172' FREE SPIN: 3250 PSI, RATE: 2.81 BPM IN, 2.83 BPM OUT CIRC PRESSURE: 3250 - 3400 PSI -WOB 2.K -3.5K - MUD WEIGHT:8.97 PPG IN, 8.9 PPG OUT, WINDOW ECD: 10.13 PPG 23:30 0000 0 50 DRILL P 10,196.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 10172' TO 10196' FREE SPIN: 3250 PSI, RATE: 2.81 BPM IN, 2.83 BPM OUT CIRC PRESSURE: 3250 - 3400 PSI -WOB 2.K -3.5K MUD WEIGHT:8.97 PPG IN, 8.9 PPG OUT, WINDOW ECD: 10.13 PPG NOTE:FREQUENT PICK UPS DUE TO WT TRANSFER / DIFFERENTIAL STICKING Printed 1/7/2020 10 13.42AM **All depths reported in Drillers Depths" Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) North America - ALASKA - BP Operation Summary Report Start Date: 11/27/2019 End Date: 12/11/2019 Page 11 of 25 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/4/2019 100.00 04:15 4.25 DRILL P 10,445.00 PROD1 DRILL 4-1/4'LATERAL SECTION FROM 10196' TO 10445' FREE SPIN: 3265 PSI, RATE: 2.81 BPM IN, 2.83 BPM OUT CIRC PRESSURE: 3250 - 3400 PSI -WOB 2.K -3.5K -MUD WEIGHT:9.06 PPG IN, 8.9 PPG OUT, WINDOW ECD: 10.19 PPG NOTE:FREQUENT PICK UPS DUE TO WT TRANSFER / DIFFERENTIAL STICKING NOTE: SWAP OUT TO MUD SYSTEM AT 0200 HRS MUD OUT BIT AT 10312' MD NEW MUD WT 8.70 PPG _ 04:15 - 06:30 2.25 DRILL P 10,445.00 PROD1 WIPER TRIP FROM 10445' TO WINDOW, RATE: 2.81 BPM IN, 2.68 BPM OUT -PASS BILLET AT 0.3 BPM, 20 FT/MIN, 20° L TF CLEAN -100' JOG BELOW WINDOW PULL THROUGH WINDOWAT 0.3 BPM, 20 FT/MIN, 180° TF CLEAN -PULLABOVE WINDOW AND OPEN EDC. -PUMP B/U AT 4.0 / 3.2 BPM. -TIE IN FROM 9300'-9320 CORRECTION +4' -JET WINDOW -OPEN EDC -RUN IN HOLE PAST WINDOW WITH NO PUMPS AT 20 FT/MIN, 180° TF CLEAN - OUT MM PLUGGING OFF, WHP INCREASED THEN FELL OFF THEN OUT RATE INCREASED, PU SLOW, REDUCE RATE TO 0.25 BPM AND MONITOR - IN & OUT RATES ARE STABLE WITH NO CHANGE IN OUT DENSITY, BLOW DOWN OUT MM CONTINUE RIH 06'30 1130 5.00 DRILL P 10,900.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 10445' FREE SPIN: 3000 PSI RATE: 2.79 BPM IN, 2.83 BPM OUT CIRC PRESSURE: 3000 - 3400 PSI -WOB 2.5.K -3.5K ***KWD DRILL*** COMMENTS IN SAFETY SECTION - 10590' DRILLED INTO HIGH PERM ZONE, NO WOB AND 300 FPH ROP, PU AND STARTING TO LOOSE RETRUNS - LOST ABOUT 3 BBLS THEN BACK TO 1:1, MONITOR FORA FEW MINUTES, IN & OUT RATES ARE STABLE, RIH TO CONTINUE DRILLING DRILLED TO 10645 AT 250+ FPH THEN ROP SLOWED AND WOB INCREASED DRILLED TO 10650', PU TO 10550' ABOVE THE HIGH PERM ZONE TO MAKE SURE IT'S CLEAR BEHIND US BACK ON BOTTOM DRILLING WITH GOOD WOB, MINIMAL LOSES -4-6 BPH HIGH ROP DRILLING WITH FREQUENT PU'S TO SPACE OUT THE CUTTINGS AND NOT LOAD UP THE WELL Printed 1/7/2020 10:13 42AM **All depths reported in Drillers Depths— North America - ALASKA - BP Operation Summary Report Page 12 of 25 Common Well Name: J-09 DRILLED 450', TRIP TO THE WINDOW SEE A LITTLE DRAG ACROSS THE BILLET Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 PUMPS TO 0.5 BPM AND PULL THROUGH THE WINDOW OPEN EDC AND JET ACROSS WS THEN PU Project: PBU Site: J TIED IN AT THE WS WITH A+5' Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. -CLOSED EDCAND RIH BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) TO 11230' Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) CIRC PRESSURE: 2900 — 3200 PSI (usft) -WOB 0.65K -3.9K 11:30 - 14:45 3.25 DRILL P 10,900.00 PROD1 WIPER TRIP 14:45 - 18:00 3.25 DRILL P 1800 - 20:30 250 DRILL P 20:30 - 00:00 3 50 DRILL P Printed 1/7/2020 10:13 42AM **All depths reported in Drillers Depths" DRILLED 450', TRIP TO THE WINDOW SEE A LITTLE DRAG ACROSS THE BILLET JOG IN HOLE AT THE WINDOW, DROP PUMPS TO 0.5 BPM AND PULL THROUGH THE WINDOW OPEN EDC AND JET ACROSS WS THEN PU INTO THE CSG AND CIRC A BOTTOMS UP TIED IN AT THE WS WITH A+5' CORRECTION, CIRCA BOTTOMS UP UNTIL CLEAN -CLOSED EDCAND RIH 11,233.00 PROD1 DRILL 4-114" LATERAL SECTION FROM 10445' TO 11230' FREE SPIN: 2950 PSI RATE: 2.62 BPM IN, 2.69 BPM OUT CIRC PRESSURE: 2900 — 3200 PSI -WOB 0.65K -3.9K 11,347.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 11230' to 11350' FREE SPIN: 2950 PSI RATE: 2.62 BPM IN, 2.69 BPM OUT CIRC PRESSURE: 2900 — 3200 PSI WOB 0.65K -3.OK PUMPED 10 BBLS LOVIS / 10 BBLS HIVIS IN PREPARATION FOR LONG WIPER - BECAME DIFFERENTIALLY STUCKAS LOVIS STARTED EXITING. PULLED TO 80K TWICE. TRAP PRESSURE AND LET RELAX FOR 5 MIN. CAME FREE. 11,347.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW - RATE: 2.96 BPM IN, 3.0 BPM OUT. CIRC PRESSURE: 3420 PSI - OVERPULLAT 10126' MD. PULLED RIGHT BY. - JOG PRIOR TO PASSING BY BILLET. JOG AND PULL BY WINDOW WITHOUT ISSUE. - JET TRAY WITH 10 BBLS LOVIS / 10 BBLS HIVIS - LOG DOWN FOR TIE-IN FROM 9300' TO 9317' MD (FORMATION) WITH +8' CORRECTION PUMP 2 BOTTOMS UP BEFORE SHAKER CLEANED UP Printed 1/7/2020 10:13 42AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 13 of 25 Common Well Name: J-09 I G Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 -- - - Project: PBU I - Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (usft) 12/5/2019 - 00:00 14:45 14.74.75 -L P DRILL 11,746.00 I, PROD1 - - DRILL4-1/4"LATERAL FREE SPIN: 3300 PSI, 2.84 BPM RATE: 2.84 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3300 - 3457 PSI MUD WEIGHT: 8.85 PPG IN, 8.66 PPG OUT, ECD: 10.15 PPG ROP: 20-40 FT/HR, WOB: 2.4- 3.4 KLBS MULTIPLE PICKUPS TO MAINTAIN DRILLING DRILLED INTO A SHALE FROM 11450 TO 111510 - WT TRANSFER AFTER DRILLING SHALE IS SLOWLY GETTING WORSE, BRING LUBES UP TO 3% 11700 INC DROPPING WITH HS TF PU FROM 11710 AND PULL HEAVYAT 11650, START OF A SHALE WE ARE DRILLING DRILLED ANOTHER SHALE FROM 11650 DRILLED TO 11746 STARTED DRILLING OFF PUAND WEARS .11 LINE L H AVY, PU L BSK AND 2X AND NO MOVEMENT, SHUT DOWN PUMP TRAPPING 10.1 ECD ALLOW WELLBORE TO RELAX WHILE HOLDING 81K - AFTER 5 MIN WT STARTED DROPPING OFF AND WE PULLED FREE, ONLINE WITH PUMP 1445 21 00 6.25 DRILL P 11,746.00 PROD1 WIPER TRIP DRILLED 400' TO THIS DEPTH, WIPE TO THE WINDOWAND SEE WHAT OUR BOTTOMS UP LOOKS LIKE CLEAN TRIP TO THE WINDOW OPEN EDC AND LOG TIE IN AT THE WS, CORRECT DEPTH +4' ! BOTTOMS UP FROM THE WINDOW HADA FEW CHUNKS OF SHALE NOTHING MAJOR, BLOW DOWN OUT MM PUMPED 2 BOTTOMS UP. CLOSE EDC. RIH THROUGH WINDOWAND BILLET WITHOUT ISSUE CONTINUE IN HOLE AT MIN RATE 0.30 BPM IN / 0.46 BPM - STACK4.5KAT 10153' MD. POPPED BY CONTINUE IN HOLE START TAKING WEIGHT AT 11 640'MD TO 11680' MD. BRING RATE UP TO DRILLING. IMMEDIATELY START STACKING AND PULLING HEAVY. WORK PUMP RATE AND PIPE TO GET BACK OUT. WIPER UP WHILE DISCUSSING WITH ODE / GEO / WSUPT. DECISION TO ATTEMPT TO CLEAN UP Printed 1/7/2020 10.1342AM `*All depths reported in Drillers Depths`* North America - ALASKA - BP Operation Summary Report Page 14 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 DRILL N 11,746.00 r PROM RIH 2.60 BPM IN RATE / 2.72 BPM OUT RATE 8.90 PPG / 8.70 PPG OUT 12/6/2019 00:00 - 0700 START INTO PROBLEM AREA WITH 10 BBLS HIVIS PILL FOLLOWED BY 20 BBLS OF 9.8 PPG SWEEP. STACK WEIGHTAT 11680' MD WITHOUTANY MOTOR WORK. -WORK BHA UP TO 11632' MD. BHA STUCK. PULLING -9K WOB. ATTEMPT TO ORIENT. HOT AMPING OUT. MECHANICALLY STUCK. WORK PUMP PRESSURE. MAINTAIN CIRCULATION. MOTOR STALLED. POPPED FREE. DRAGGING FROM 11632' UP THROUGH 14N SHALE. PULL CLEANUP TO 9780' MD. ATTEMPT TO 'PERFORMAJOG. STACKEDWEIGHT IMMEDIATELY. ANNULAR PRESSURE INCREASE. PACKING OFF WORKED PUMP RATE / PRESSURE. FREE UP. CONTINUE BY BILLET AND WINDOW WITHOUT ISSUE OPEN EDC, PUMP 2 BOTTOMS UP AT MAX RATE. NOTHING SUBSTANTIAL SEEN. DISCUSS WITH ODE / WS GEO / OPS GEO / WSUPT. START PREPPING FOR BILLET 7 00 DRILL N 11,746.00 PROD1 CONDITION WELL FOR ANCHORED BILLET 0.5 BPM IN RATE / 0.6 BPM OUT RATE 8.94 PPG IN/ 8.71 PPG OUT BOBBLE AT 101 53'MD. CLEAN TRIP TO 11300' MD PUMPED 10 BBLS LOVIS / 10 BBLS HIVIS PERFORM WIPER FROM 11 300'MD TO WINDOW WITHOUT ISSUE OPEN EDC, JET TRAY. PUMP BOTTOMS UP. SWAP WELL OVER TO 9.8 PPG AND POOH FLOW CHECK AT SURFACE GOOD NO FLOW, SHALLOW TEST AGITATOR GOOD TEST AT 2.5 & 2.9 BPM, REMOVE INJECTOR AND LD THE BHA INJECTOR OFF AT 06:15 BIT GRADE 6-1 RO BC Printed 1/7/2020 10 13 42A `'All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 15 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) - — (usft) 07:00 18:00 11.00 STKOH N DFAL 10,560.00 PROD1 ALUMINUM BILLET OPS - VERIFIED BILLET OD, LENGTH AND ANCHOR ORIENTATION MU BILLET BHA, VERIFY SCRIBE AND OFFSET TO MWD INJECTOR ON AT 07:40 RIH WITH BILLET BHA LOG TIE IN, CORRECT DEPTH -32', CLOSE THE EDC RIH, TAG AT 9474 WITH 7.6K WOB THEN FELL THROUGH, CLEAN THE REST OF THE WAY THROUGH THE WINDOW SET DOWN AT BILLET 9453' WITH 10.4K, PU AND PULLED -6.2K, RIH AND TAG AT 9652 WITH 5.6K WOB, PU -3.6K - ORIENT 90° ROHS AND RIH, SET DOWN AT 9651.2 WITH 2.4K WOB, TRY TO ORIEINT - CALL WSUPTAND ODE AND DISCUSS, DECISION MADE TO TRY 30° L & R OF HS MAX 10K WOB MADE IT PAST BILLET, CONTINUE RIH TAG AT 10585, PU WITH A LITTLE OVER PULL, RIH AND TAG AT 10580', PU TAG AT . 10582, 10 ATTEMPTS TO GET DOWN HAVE FAILED, CALL TOWN TEAM DECISION MADE TO SET THE TOB AT 10560' AND POOH, GET WT'S (50K) AND RIH TO 10572.43' PLACING THE TOB AT 10560' - STOP AT 10572.4 (TOB AT 10560') PU TO 45K, ONLINE AND SHEARED OFF AT 3450 PSI, SET DOWN 6.1KAND NO MOVEMENT ONLINE WITH PUMP AND POOH FLOW CHECK ABOVE THE WINDOW GOOD NO FLOW, POOH FLOW CHECK, GOOD NO FLOW, INJECTOR _ OFF AT 17:15, LD THE BHA — 18 00 2200 4.00 STKOH N 10,560.00 PROD1 REPLACE DUAL FLOATS / PACKOFFS TEST PER BP REQUIREMENTS MAKEUP BHA#10. SHALLOW TEST AGITATOR. GOOD TEST. ATTEMPT TO OPEN EDC. NOT WORKING INJECTOR OFF: 21:30 INJECTOR ON 22:00 SWAP OUT UPPER SECTION. OPEN EDC TEST QTS. 2200 0000 200 STKOH N 10,560.00 PROD1 RIH WITH 4-1/4" DRILLING BHA#11 - RATE: 0.39 BPM IN, 0.88 BPM OUT. CIRC PRESSURE: 662 PSI MUD WEIGHT: 8.87 PPG IN, 9.63 PPG OUT 12/7/2019 00:00 0200 2.00 STKOH N 10,564.00 PROD1 CONT'D RIH WITH 4-1/4" DRILLING BHA #11 - RATE: 0.27 BPM IN, 0.30 BPM OUT. CIRC PRESSURE: 886 PSI MUD WEIGHT: 8.87 PPG IN, 9.62 PPG OUT LOG DOWN FOR TIE-IN FROM 9200' TO 9323' MD (FORMATION) WITH -34' CORRECTION SWAP WELLBORE BACK OVER TO DRILLING FLUID CLOSE EDC. PU WEIGHT 52K RIH THROUGH WINDOWAND BY BILLET#1 WITHOUT ISSUE Printed 1/7/2020 10 13 42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 16 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 - - - -� Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM I Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - - - - (hr) - (usft) 02:00 - 18:30 16.50 STKOH N 11,100.00 PROD1 OPENHOLE SIDETRACK OFF ANCHORED BILLET -DRY TAG BILLET AT 10564' MD. PU OFF BILLETAND ESTABLISH PARAMETERS RATE: 2.81 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 3601 PSI MUD WEIGHT: 8.98 PPG IN, 8.79 PPG OUT WINDOW ECD: 10.50 PPG STALLED WHILE ATTEMPTING TO INITIATE MILLING. PUANDREINITIATE - BEGIN TIME MILLING AT 1 FPH STARTING AT 10563.57' -INCREASE ROP AFTER 1 FT. GETTING VERY LITTLE DEPARTURE OFF OLD WELL. ROP 250-300 FPH. FREQUENT SHORT WIPERS. DROP RATE DOWN TO 2.5 BPM TO HELP WITH DIRECTIONAL CONTROL GETTING GOOD DLS AT 10700, GOT COUPLE 19'S AVG 12.5° 10832' PU OFF BOTTOM TO DISCUSS PLAN FORWARD AS WEARE NOT SEEING THE 14N YET AND THE PLAN FROM HERE IS TO LEVEL OFF TO 90°AND WOULD COULD LAND IN THE 14N - DECISION MADE TO KEEP DRILLING DOWN AT 85° UNTIL WE SEE THE 14N & PROACTIVELY START HOLDING 10.6 ECD AT THE WINDOW AND WHEN THE ROP STARTS TO IMPROVE, LEVEL OFF TO 90° - 10870 GETTING PUSHED AROUND TRYING TO BUILD AND GETTING PUSHED DOWN, BIT MIGHT BE GETTING WORN WITH ALL THE CHERT WE ARE SEEING IN THE SAMPLES - 10893 GEO'S WANT TO LEVEL OFF AT 90° NOW LANDING AT -8972 - 10960 ROP SLOWING DOWN, DRILLING SHALE - PU WT'S ARE FAIRLY CLEAN SMALL OVER PULLS AND CIRC PRESSURES ARE OK CONTINUE TO DRILLAHEAD WITH FREQUENT PICKUPS Printed 1/7/2020 10.13 42AM `*All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 17 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr)�.-- (usft) _ 18:30 22:30 4.00 DRILL N 11,100.00 PROD1 PERFORM LONG WIPER TRIP - RATE: 2.97 BPM IN, 2.98 BPM OUT. CIRC 22:30 - 00 00 1.50 12/8/2019 00:00 03:00 3.00 03.00 10.30 7.50 i DRILL N - 11,149.00 PROD1 I DRILL N 11,311.00 PROD1 'I DRILL N 11,311.00 PROD1 Printed 1/7/2020 10.1342AM "All depths reported in Drillers Depths"` PRESSURE: 4080 PSI CHASE 10 BBLS LOVIS / 10 BBLS HIVIS 10K OVERPULL AT 101 51'MD TO 10115' MD (SHALE) - OPEN EDC, JET TRAY WITH PILLS 3.77 BPM IN / 3.87 BPM OUT - LOG DOWN FOR TIE-IN FROM 9470' TO 9502' MD (RA TAG) WITH -2' CORRECTION - PUMP 2 BOTTOMS UP TO GET HOLE CLEANED UP. - CLOSE EDC. RIH TO BOTTOM -SAT DOWN IN SHALEAT 10115' PU MULTIPLE TIMES AT MIN RATE. NO LUCK. INCREASE RATE TO 1 BPM. STILL STACKING. - BRING RATE UP TO DRILLING RATE. SLOWLY HAVE TO WORK OUR WAY THROUGH SHALE. POP OUT AT 10157' - ONCE THROUGH. DROP BACK TO MIN RATE. DRILL 4-1/4" LATERAL FREE SPIN: 3885 PSI, 2.85 BPM RATE: 2.84 BPM IN, 2.92 BPM OUT. CIRC PRESSURE: 3885-4100 PSI - MUD WEIGHT: 9.06 PPG IN, 8.87 PPG OUT, ECD: 10.6 PPG ROP: 20 FT/HR, WOB: 3.5-4.2K WEIGHT TRANSFER BECOMING ISSUE. DRILLING WITH MULTIPLE PICKUPS. CALL FOR NEW MUD. DRILL 4-1/4" LATERAL FREE SPIN: 3968 PSI, 2.83 BPM RATE: 2.83 BPM IN, 2.90 BPM OUT. CIRC PRESSURE: 3968 - 4216 PSI - MUD WEIGHT: 9.09 PPG IN, 8.91 PPG OUT, ECD: 10.61 PPG - ROP: 50-150 FT/HR, WOB: 1.9 - 3.5 KLBS PERFORMING BHA WIPERS WHEN NEEDED MUD SWAP 2.90 BPM IN RATE / 2.83 BPM OUT RATE 8.79 PPG IN / 8.73 PPG OUT WINDOW ECD: 10.6 PPG CHOKE PRESSURE: 240 PSI -WIPER UP. TEMPORARILY DETAINED. CYCLE PUMPS AND PIPE. FREE UP - DRAGGING UPHOLE. CONTINUE TO WIPER UP HOLE WITH DIFFICULTY. LEVEL OUT BELOW BILLET. NEW MUD ALL THE WAY AROUND. - RUN MIN RATE BACK DOWN. BEGIN FIGHTING OUR WAY BACK TO BOTTOM. BACK ON BOTTOM 11355' 60-70 FPH, RIH WT = 16K, DRILLING WITH -1 TO -5K SURFACE WT TO GET 2K WOB - INCREASE LSRV FROM 58K TO 65KAND LUBES FROM 3% TO 4% IN HOPES TO IMPROVE WEIGHT TRANSFER North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU --j Site: J - - - Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Page 18 of 25 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations T (hr) (usft) _ 10:30 18:00 7.50 DRILL N 11,689.00 PROD1 WIPER TRIP - DRILLED 450', WIPE TO THE WINDOW CHASING PILLS 11162 A LITTLE OVER PULL ON THE BHA NOT �ATTHE BIT 11104 PULLED 20K OVER AND PACKING OFF THEN CLEARED ITSELF A LITTLE DRAG THROUGH THE BILLET SPIKE IN ANNULAR PRESSURE AS THE CTC ENTERED THE SHALE AT 10155, BHA PULLED THROUGH CLEAN PU THROUGH THE WINDOW, OPEN EDC AND PUMP BOTTOMS UP BOTTOMS UP UNLOADED -5 GAL OF SHALE SMALL TO 3/4' CHUNKS SECOND BOTTOMS UP IS CLEAN, CLOSE EDC AND RIH CONTINUE DRILLING AHEAD WITH FREQUENT PICKUPS. 18:00 20:30 2.50 DRILL N 11,723.00 PROD1 DRILL 4-1/4"LATERAL FREE SPIN: 3316 PSI, 2.71 BPM RATE: 2.71 BPM IN, 2.71 BPM OUT. CIRC PRESSURE: 3316 - 3470 PSI MUD WEIGHT: 8.82 PPG IN, 8.64 PPG OUT, j ' WINDOW ECD: 10.55 PPG CHOKE PRESSURE: 304 PSI ROP: 20 FT/HR, WOB: 2.3-3.6 KLBS ROP AND MOTOR DIFFERENTIAL INDICATING BIT MAY BE WORN OUT. 20:30 - 22:30 2.00 DRILL l N 11,723.00 PROD1 DYNAMIC FLOW CHECK. WELL STATIC REDUCE RATE WHILE PULLING THROUGH SHALES. PULL THROUGH WINDOW OPEN EDC RATE: 4.1 BPM IN, 4.23 BPM OUT. CIRC PRESSURE: 4280 PSI MUD WEIGHT: 8.86 PPG IN, 8.64 PPG OUT, i WINDOW ECD: 10.63 PPG CHOKE PRESSURE: 179 PSI PUMP BOTTOMS UP. CLEAN START SWAPPING TO 9.8 PPG FLUID. 22:30 00:00 1.50 DRILL IN 11,723.00 PROD1 POOH MUD WEIGHT: 9.82 PPG IN, 8.68 PPG OUT RATE: 3.49 BPM IN, 3.03 BPM OUT WINDOW ECD: 10.6 PPG 12/9/2019 00:00 01:30 1.50 DRILL N 11,723.00 PROD1 POOH i- PERFORM 10 MIN FLOW CHECK. WELL STATIC INJECTOR OFF: 01:10 I - PULL BHA#11. LAY DOWN AGITATOR, MOTOR AND BIT _ -SWAP OUT AGITATOR WHILE 01:30 02:00 0.50 DRILL N F 11,723.00 PROW PERFORM WEEKLY BOPE FUNCTION TEST Printed 1/7/2020 10 13 42AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Page 19 of 25 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 02:00 - 02:30 0.50 DRILL N 11,723.00 1 PROW MAKEUP 4-1/4" DRILLING BHA#12 PICK UP 2-7/8" ULS (1.15 DEG AKO) AND 3.0" r 02:30 - 06:30 4.00 DRILL 06:3010:30 COILTRAK TOOLS MAKE UP 2-7/8" HYCALOG AGITATOR 00 DRILL 10:30 12.45 2.25 DRILL 1245 - 12:55 0.17 DRILL Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** COILTRAK TOOLS MAKE UP 2-7/8" HYCALOG AGITATOR MAKE UP RERUN 4-1/4" SRFX3211M-B11, HYCALOG BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES INJECTOR ON: 02:05 RIH AND SHALLOW TEST AGITATOR. GOOD TEST N 11,723.00 PROD1 RIH WITH 4-1/4" DRILLING BHA#12 - RATE: 0.62 BPM IN, 1.09 BPM OUT. CIRC PRESSURE: 1001 PSI MUD WEIGHT: 9.82 PPG IN, 9.62 PPG OUT LOG DOWN FOR TIE-IN FROM 9310' TO 9359' MD (FORMATION) WITH -35' CORRECTION SWAP WELL BACK OVER TO 8.6 PPG DRILLING FLUID SET DOWN AT 10124 2X THEN MADE IT PAST. TAGS AT 11154 AND 11712 AFTER BRINGING THE PUMPS UP WE WEREABLE TO MAKE IT BACK TO BOTTOM P 11,857.00 PROD1 DRILL 4-1/4" LATERAL FREE SPIN: 3875 PSI, 2.75 BPM RATE: 2.75 BPM IN, 2.78 BPM OUT. CIRC j PRESSURE: 3875 — 3921 PSI MUD WEIGHT: 8.91 PPG IN, 8.67 PPG OUT, WINDOW ECD: 10.54 PPG CHOKE PRESSURE: 190 PSI ROP: 50 FT/HR, WOB: 2.37 — 3.48 KLBS 10710 TOOL SHOWING A LOT OF VIBRATION ONCE WE STARTEDDRILLING INTO ASHALE N 11,857.00 PROD1 STUCK PIPE OPS - DRILLED TO 11857 WENT TO PU AND PULLING HEAVY, PULLED TO 80K STOP AND WAIT FOR TOOL PUSHER TO COME TO THE OPS CAB SO WE CAN PULL TO 90K, PULL TO 90K AND WE ARE STUCK, SHUT DOWN PUMP TRAPPING 10.6 ECD AT THE WINDOWALLOW WELL TO RELAX, PULL 2X TO 90K WITH NO MOVEMENT ONLINE WITH SPACERS AND MINERAL OIL 11:45 10 BBLS OF MIN OIL OUT, SHUT DOWN PUMP AND ALLOW TO SOAK, PULLED FREE AFTER 2 MIN, CIRC OUT MIN OIL &_SPACER P 11,860.00 PROD1 DRILL 4-1/4" LATERAL FREE SPIN: 3985 PSI, 2.85 BPM RATE: 2.85 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 3985-3921 PSI - MUD WEIGHT: 8.93 PPG IN, 8.71 PPG OUT, WINDOW ECD: 10.55 PPG CHOKE PRESSURE: 264 PSI ROP: 50 FT/HR, WOB: 2.37 — 3.48 KLBS Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Page 20 of 25 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:55 - 14:15 1.33 DRILL N 11,860.00 PROD1 STUCK PIPE OPS - DRILLED 3', STARTED DRILLING OFF, PU AND WE ARE STUCK - PULLED 90K NO MOVEMENT, SHUT DOWN PUMP TRAPING 10.6 ECD - PULL 90K NO MOVEMENT, PUMP MIN OIL WITH SPACERS - PULLED FREE AFTER 10 BBLS OUTAND 8 MIN SOAK Printed 1/7/2020 10:13:42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 21 of 25 Common Well Name. J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Daterrime: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- - ' (hr) (usft) 14:15 - 22:30 8.25 DRILL N 11,863.00 PROD1 WIPER TRIP CIRC OUT MIN OILAND PULL TO THE WINDOW PULLING HEAVY IN THE SHALE AT 11130, RIH AND CANT GO DOWN, REDUCE PUMP RATE PACKING OFF WORK PIPE DOWN, GOT LITTLE MOVEMENT, WORK PIPE UP TO UP WT THEN BACK DOWN, STACKING OUT, ABLE TO ORIENT BUT SHOWING WOB CHANGES PU AND WORK PIPE UP TO UP WT AT 55K, GETTING MOVEMENT COMING UP, KEEP COMING UPAND PULLED THROUGH PU HOLE TO 10950 ABOVE SHALE, INCREASE PUMP RATE AND POOH TO THE WINDOW PULLED HEAVYAT 10105', RIH AND POPPED FREE, THIS IS THE UPPER SHALE WE HAVE SEEN PACKING OFF AND OVER PULLS THROUGH PULL THROUGH WINDOW, OPEN EDC AND PUMP A BOTTOMS UP AT MAX RATE CORRECT DEPTH +7' BOTTOMS UP FROM THE 10150 SHALE UNLOADED ANOTHER 3-4 GAL OF SMALL TO 3/4" SHALE CHUNKS - BOTTOMS UP FROM THE WINDOW BROUGHT UP ABOUT ANOTHER GALLON OF THE SAME THEN CLEANED UP LINE UP TO BLOW DOWN THE OUT MM CLOSE THE EDC AND RIH RIH THROUGH 14N SHALE AT MIN RATE. SLIGHT BOBBLES UP TO 11161' MD. STACK 4AK. NO LUCK. PICK UP TO BREAK OVER. - BRING PUMPS UP TO RATE AND ATTEMPT TO WASH DOWN THROUGH IT. START STACKING WITH MOTOR WORKAT 11138 MD. PACKING OFF AND STALLING BIT. WORK PIPE AND PUMPS ON AND OFF TO KEEP BHA MOVING. DRAG UP UNTIL BHA MOVING FREELY. DISCUSSED WITH ODE / ETL. DECISION TO ATTEMPT TO CLEAN OUT SHALE. - RUN BACK TO BOTTOM AT MIN RATE, STACKAT 11025', 11046, 11082, 11133' STACK OUT - WORK OUR WAY FREE OF SHALE AT 11100'- 11133' - WIPER WITH PILLS THROUGH BILLET #2, AND CLEAN THROUGH SHALE AT 10115 - 10150' - PERFORM JOGS AND PULL THROUGH WINDOW. OPEN EDC. - CIRCULATE WHILE JETTTING TRAY. JUST PAST BOTTOMS UP. WELL UNLOADED 4 GALLONS OF 1/4" TO 3/4" SHALE. - PUMP SECOND BOTTOMS UP. CLEANED UP WITH MINIMAL SHALE PIECES COMING BACK LOG TIE IN WITH +5' CORRECTION. CLOSE EDC. Printed 1/7/2020 10 13 42A '*All depths reported in Drillers Depths"' North America - ALASKA - BP Operation Summary Report Page 22 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 22:30 00:00 1.50 DRILL N 11,863.00 PROD1 RIH 0.46 BPM IN / 0.61 BPM OUT CIRCULATING PRESSURE: 1546 PSI - 8.85 PPG IN / 8.68 PPG OUT WINDOW ECD: 10.63 PPG CHOKE PRESSURE: 430 PSI - RUN CLEAN DOWN TO 11138' AT MIN RATE. BOBBLE DOWN TO THIS DEPTH. PICKED UP TO BREAKOVER. START STAGING RATE UP. SETTING DOWN HIGHER. WORK BOTH PUMPS AND PIPE AND GET !'BHA FREELY MOVING ABOVE SHALE. JOG AND RUN BACK IN. SETTING DOWN AT 11038'. WORKING BHA FREE AGAIN. PULL WIPER TO WINDOW TO PUMP SHALES TO - - SURFACE — --- - 12/10/2019 00:00 02:00 2.00 DRILL N 11,863.00 PROD1 WIPER CONT'D PULL THROUGH WINDOW WITHOUT ISSUE STAGE PUMPS UP TO 4.08 BPM IN RATE / 4.12 BPM OUT RATE JUST PAST BOTTOMS UP. WELL UNLOADED ANOTHER 3-4 GALLONS OF THE 1/4" -1/2" SHALE. PLUGGED MICROMOTION. HAD TO BYPASS ON THE FLY. CONTINUED CIRCULATING TILL WELLBORE CLEANED UP. BLEW DOWN MICROMOTION AND RETURNED THROUGH NORMAL FLOW PATH. 02 00 05 30 3.50 DRILL N 11,863.00 PROD1 RIH CLOSE EDC, RUN THROUGH WINDOW WITHOUT ISSUE 0.50 BPM IN RATE / 0.48 BPM OUT RATE 8.92 PPG IN / 8.67 PPG OUT WINDOW ECD: 10.63 - TAG AT 10148' MD. PICK UP AND RUN BACK BY. BEGIN WORKING THROUGH SHALE AT 11000' MD. VARY RATE AND PU AND DOWN. WORKED THROUGH. STARTED RUNNING CLEANLY AT 11,200' MD. BRING RATE UP TO 2.80 BPM IN / 2.79 BPM OUT START SLOW WIPER -15 FPM WHILE PUMPING 10 BBLS OF 9.8 PPG WEIGHTED HIVIS SWEEP. DRAGGING THROUGH SHALE BUT GIVING IT BACK. NOT HAVING TO STOP. CONTINUED TO CHASE TO WINDOW. DID NOT SEE ANYTHING COMING THROUGH SHALEAT 10150' MD TO 10115' MD PULL BY BILLETAND WINDOW. TRAP PRESSURE. OPEN EDC. JET TRAY AND BRING RATE UP TO 3.91 BPM IN / 4.16 BPM OUT - RECOVERED 3 GALLONS OF SMALLER SHALE. PUMP SECOND BOTTOMS UP. SHAKER CLEANED UP. - LOG TIE IN +5' Printed 1/7/2020 10 13 42A "All depths reported in Drillers Depths" Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) North America - ALASKA - BP Operation Summary Report Start Date: 11/27/2019 End Date: 12/11/2019 Page 23 of 25 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) — - - — 05:30 12:30 7.00 DRILL N PROD1 RIH WITH 4-1/4" DRILLING BHA i11 RATE: 0.40 BPM IN, 0.83 BPM OUT. CIRC PRESSURE: 1500 PSI MUD WEIGHT: 8.88 PPG IN, 8.68 PPG OUT MAINTAIN 10.6 ECD AT THE WINDOW TAGGING AT 11135-11138, NO 1.0 BPM, 0.5 BPM, NO PUMP, 2.5 BPM, 1.2 BPM - DISCUSS WITH WSUPT, ETL & ODE THAT WE MAY NEED TO DRILL OUR WAY THROUGH AT A RATE FASTER THAN IT WAS DRILLED AT TO CLEAN IT UP. ""HOLD A KWT DRILL WHILE TOWN TEAM DISCUSSES PLAN FORWARD"" TOWN TEAM AGREES WITH PLAN TO CLEAN UP THE WELLBORE AT DRILLING RATE 11050 BRING PUMPS TO RATE AND RIH TO 11115' AND SLOW ROP TO 3-5 FPM, TAG AT 11077', TRY LOWER RATE, TAG AT SAME DEPTH, PULLED 10K OVER, MADE IT PAST, TAG AT 11 082'PU, SLOW RIH SPEED AND MADE IT PAST, TAG AT 11141' WITH A LITTLE MOTOR WORK THEN STALLED, PU AND SLOW RIH SPEED TO 3 FPM - MADE IT DOWN TO 11147' THEN STACKED 3 6K WOB WITH NO MOTOR WORK, PU AND PULLED -4.6K ON THE BHA, PULLING HEAVY AT AT THE BHA KEEP PULLING UNTIL CLEAN 10725 PULLING CLEAN, RIH, START TAKING WT AT 11088' BUT PUSHING THROUGH, SLOW DOWN RIH SPEED TO 10 FPM AT 11110', SLOW DOWN TO 3 FPM AT 11141' - TAG AND STALL AT 11144.75', PU TO UP WT AND TRY AGAIN, TAG AT 11141' AND STALL MADE IT TO 111 55'AND STACKING WT THEN STALLED AT 11157 - MADE IT PAST SHALE THEN STACKED OUT AT 11185' IN THE SAND, PU RIH AND STACKED OUT AGAIN WITH WOB BUT NO MOTOR WORK - CAN'T GET PAST 11185, TAGGING BUT NO MOTOR WORK, WELLBORE IS DIRTY BEHIND US, PUH TO CLEAN UP BEHIND US - 11000' ALMOST PACKED OFF AROUND THE BHA, PULLTHE WINDOW TO CLEAN UP THE WELLBORE - PULLED THROUGH 11150 TO 10950 SHALE WITH A FEW 1-2K OVER PULLS ON THE BHA, PULLED THROUGH 10150 SHALE CLEAN, PULLED -3KAT THE WINDOW OPEN THE EDC AND PUMP A BOTTOMS UP GETTING A LOT OF COURSE CUTTINGS BEFORE BOTTOMS UP, BOTTOMS UP BROUGHT ANOTHER 6 GAL OF SHALE TIE IN WITH +1' CORRECTION OUT MM PACKING OFF, BYPASS & BLOW DOWN, STILL PACKED OFF, 250 PSI AT LUBRICATOR GAUGE 0 PSI ON WHP CHOKE LINE IS CLEAR Printed 1/7/2020 10:13 42AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 24 of 25 Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Site: J Project: PBU Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM 'Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (us_ft)_ 12:30 14:20 1.83 DRILL N 11,864.00 f PROD1 RIH OPS WELL BORE IS CLEANED UP TO 11185', CLOSE EDC AND RIH AT MIN RATE LIGHT TAG AT 10120, SET DOWN AT 10161, PU IS CLEAN THEN RAN RIGHT PAST IT, BOBBLE AT 10564 BILLET, 10750 A LITTLE DRAG ENTERING SHALE TAG AT 11011 WITH 5.2K BUT POPPED THROUGH, 11084 1.6K, 11098 1.9K, 11130 6.3K PU TAG AGAIN BUT POPPED THROUGH, 11145 6.5K TAGGING AT 11145, ONLINE WITH PUMP TO WORK THROUGH AT 10 FPM, MADE IT PAST BUTANNULAR PRESSURE CLIMBING, 11156 4.1K - MADE IT THROUGH TO 12000', RIH TO BOTTOM TOCONTINUE DRILLING 14.20 19 30 5 17 DRILL P 12,136.00 PROD1 'DRILL 4-1/4' LATERAL FREE SPIN: 3866 PSI, 2.85 BPM RATE: 2.85 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3866-4287 PSI MUD WEIGHT: 8.99 PPG IN, 8.74 PPG OUT, WINDOW ECD: 10.75 PPG CHOKE PRESSURE: 116 PSI ROP: 50 - 140 FT/HR, WOB: 1.45 — 3.25 KLBS -DRILLING BREAK 12123' MD. CONTINUE DRILLING AHEAD TO 12136' MD. SAW 2 BBL LOSS. VIBRATIONS GOING INTO 4 TO 6 RANGE. SUSPECT FAULT DISCUSSION WITH WSUPT / ODE / ETL. CALLING TD 19 30 00 00 4.50 DRILL P ! 12,136.00 PROD1 CONDITION WELLBORE FOR LINER WIPER TO BOTTOM OF TROUBLE SHALE. PERFORM BHA JOG. PULL THROUGH SHALE AT 111 50'TO 10950' AT 15 FPM. 2-5K OVERPULLS WITH MINIMAL MOTORWORK DRAGGING THROUGH SHALE PERFORMED LONG JOG JUST BELOW BILLET#2 AT 10564' MD. PULLED THROUGH CLEANLY. CONTINUE WIPER TO WINDOWAT MAX RATE NOTHING SEEN AT 10115' TO 10150' SHALE. PULLTHROUGH BILLETS AND WINDOW. OPEN EDC. JET TRAY. PUMP MULTIPLE BOTTOMS UP. HOLE UNLOADED 4 GALLONS OF 1/4" - 1/2" SHALE WITH A FEW 1/2" X 1" SQUARE PIECES MICROMOTION AND CHOKE PLUGGED UP TWICE. CLOSE EDC. MIN RATE TO 10700' Printed 1/7/2020 10:13 42AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 25 of 25 Operation Summary Report Common Well Name: J-09 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/27/2019 End Date: 12/11/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:00AM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/11/2019 00:00 03:00 3.00 DRILL P 12,136.00 PROD1 RIH 0.50 BPM IN RATE / 0.68 BPM OUT RATE 8.99 PPG IN / 8.70 PPG OUT DRIFT TO 10,700' WITHOUT ISSUE. BRING RATE UP TO 2.80 BPM IN / 2.82 BPM OUT. PERFORM WIPER TO WINDOW. PUMP 10 BBLS LOVIS / 10 BBLS HIVIS AT BOTTOM AND AT WINDOW PULL THROUGH WINDOW WITHOUT ISSUE. OPEN EDC JET TRAY WITH PILLS LOG TIE IN WITH +6 CIRCULATED SURFACE TO SURFACE. MINIMAL SHALES. BLOW DOWN CHOKE 0300 07.00 4.00 DRILL P 12,136.00 PROD1 POOH 3.94 BPM IN RATE / 4.08 BPM OUT RATE 9.80 PPG IN / 8.87 PPG OUT. CIRCULATE 9.8 PPG MUD OUT EDC. START PULLING OUT OF HOLE. PAINT WHITE FLAG AT 8979.81' BIT DEPTH (8895.86' EOP) - PAINT YELLOW FLAG AT 6298.76' BIT DEPTH (6214.81' EO P) JOG AT SURFACE AND OUT MM IS PACKING OFF, BLOW DOWN OUT MM —' FLOW CHECK WELL 50' FROM SURFACE 07:00 09:00 2.00 DRILL P 12,136.00 PROD1 INJECTOR MAINT CHANGE PACKOFFS AND TEST GOOD PT, RD TEST EQUIPMENT SWAP TO CON Printed 1/7/2020 10 13 42AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Pagel of 7 Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - j ---(hr) usft 12/11/2019 09:00 - 14:00 5.00 CASING P 12,136.00 1 RUNPRD 'PREP TO RUN LINER. PUMP 228' OF SLACK OUT. INSTALL BTT SWIVEL. PJSM FOR PUMPING 7/8" DRIFT BALL. LAUNCH BALLAND PUMP AROUND AT 1.7 BPM, BALL IS HEARD ROLLING. _ CONDUCT PJSM FOR MAKING UP LINER. 14:00 21:30 7.50 CASING P 12,136.00 RUNPRD M/U LINER AS PER APPROVED TALLY. BAKER LOCK CONNECTIONS ABOVE MOTOR AND FIRST 3 JOINTS ABOVE SHOE TRACK. AFTER 8 JTS RAN CONDUCT DI DRILL WITH BEARD CREW. CREW MOVES THE LINER JOINT BACK DOWN THE SKATE AND PICKS UP SAFETY JOINT. CREW TORQUES UP SAFETY JOINTAND RUN IN WELL, SECURED IN 3 MIN 30 SEC. i CONDUCT AAR AFTERWARDS. CONTINUE M/U LINER. STRIP INJECTOR ON: 21:00 PT QTS TO 3500#. TAG UP. SPACE OUT IS 2.32' 21:30 22:30 1.00 CASING N 12,136.00 RUNPRD ATTEMPT TO BREAK CIRCULATION. CHALLENGING GETTING PUMPS PRIMED. 22:30 00.00 1.50 CASING P 12,136.00 RUNPRD FOUND SHALE IN SUCTION SCREENS. RIH WITH LINER ON COIL j MUD WEIGHT: 8.95 PPG IN, 9.58 PPG OUT RATE: 0.24 BPM IN, 0.66 BPM OUT. CIRC PRESSURE: 1207 PSI RIH WEIGHT 20K 12/12/2019 00:00 04:30 4.50 CASING P 12,136.00 RUNPRD CONT'D IN THE HOLE WITH LINER 04:30 - 0600 1 50 STOP AT YELLOW FLAG 9392.63'- 9356.19' CORRECTED DEPTH = -36.44' CORRECTION. CORRECT DEPTH BRING PUMP RATE UP TO 1.77 BPM IN RATE / 1.76 BPM OUT RATE FINISH CIRCULATING 9.8 PPG FLUID OUT. PU WEIGHT 53K / 28K RIH WEIGHT AABOVE WINDOW. - DROP RATE TO MIN RATE. UTILIZE IA PRESSURE TO MANAGE ECD. INCREASE CHOKE TO 230 PSI -RUN CLEANLY TO 11012. START WORKING 11038, GET BY THERE. WORK DOWN TO 11114' MD. NOT MAKING MUCH FOOTAGE. LITTLE MOTOR NOT DEVELOPING MUCH I TORQUE. STALLING. - - - L CASING P 12,136.00 RUNPRD PJSM, PUMP LVT PER OCN PUMP 40 BBLS LVT WITH 10 BBLS KCL SPACER ON EITHER SIDE Printed 1/7/2020 10:12:02AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Project: PBU - Site: J --- - Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Contractor. NABORS ALASKA DRILLING INC. Active datum: KB @75.02usft (above Mean Sea Level) Rig Release: BPUOI: USA00000374 Page 2 of 7 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) 'TAG _ _ _(usft) 12,136.00 06:00 09:00 3.00 CASING P 12,136.00 RUNPRD CONTINUE WORKING PIPE DOWN. DEPTH. DIFFICULT TO WORK PAST 11117'. HAVE PJSM FOR UD LINER. CYCLED PIPE > 30 TIMES HERE. REVIEW PROCEDURE FOR STRIPPING OFF LINER. TRY TO PASS WITH VARIOUS RUNNING CLOSE PIPE / SLIP RAMS AND STRIP UP TO SPEEDS AND PUMP RATES, NO PROGRESS. 14:00 - 21:00 7.00 CASING ! P 12,136.00 RUNPRD BREAKOUT JOINTS WITH BAKER LOC ALL LVT IS PUMPED OUT TRYING TO PASS. JUST ABOVE LANDING COLLAR. WITH LVT STILL IN THE HOLE, PICK UP AND TO GET PREPPED FOR NEXT RUN 14:00 - 14:00 0.00 CASING P 12,136.00 TRY RIH AT 80 FT/MIN, 3 TIMES. TAG AT SAME — ---- — SPOT. - - 09:00 12:45 3.75 CASING P 12,136.00 RUNPRD POOH CIRC LVT OUT TO TIGER TANK WHILE WORKING EFFECTIVELY, STOP AND POOH. TROUBLESHOOT SEVERAL TIMES. SWITCH TO USING LITTLE JERKS. REDUCE RATE PULLING ACROSS BILLET AND 12,136.00 RUNPRD -CLEAR RIG FLOOR SWAP OUT TO DRILLING RISERS. THROUGH WINDOW. Printed 1/7/2020 10:12 02AM **All depths reported in Drillers Depths** CIRC 9.8# MUD TO BITAFTER PULLING 'THROUGH WINDOW. DYNAMIC FLOW CHECK HERE IS GOOD. POOH TO SURFACE. _ 'TAG 12:45 14:00 1.25 CASING r P 12,136.00 RUNPRD STRIPPER AND RIH TO SPACEOUT DEPTH. 10 MIN FLOWCHECK IS GOOD. PJSM FOR UD LINER. REVIEW PROCEDURE FOR STRIPPING OFF LINER. CLOSE PIPE / SLIP RAMS AND STRIP UP TO EXPOSE 2-3/8" PH -6 JOINT. 14:00 - 21:00 7.00 CASING ! P 12,136.00 RUNPRD BREAKOUT JOINTS WITH BAKER LOC LAY DOWN IN PIPE SHED. CUT LAST JOINT JUST ABOVE LANDING COLLAR. - SEND MOTOR AND SHOE TRACK TO BAKER TO GET PREPPED FOR NEXT RUN 14:00 - 14:00 0.00 CASING P 12,136.00 RUNPRD UD 1 JT OF PH -6 AND 8 DRILL COLLARS. UD LINER RUNNING TOOL. 15:30 START UD 2-7/8" LINER. TONGS AREN'T WORKING EFFECTIVELY, STOP AND TROUBLESHOOT SEVERAL TIMES. SWITCH TO USING LITTLE JERKS. 21:00 - 23:30 BOPSUR P 12,136.00 RUNPRD -CLEAR RIG FLOOR SWAP OUT TO DRILLING RISERS. SWAP COIL OVER TO FRESHWATER. JET STACK. VALVE CREW SERVICE TREE. REPLACE PACKOFF. _ FLUID PACK FOR BOPE TEST 23.30 - 00:00 0.50 BOPSUR P 12,136.00 RUNPRD BI -WEEKLY BOPE TEST PER AOGCC , BP, CRITERIA. TEST WITNESSED BYAOGCC REP MATTHEW HERRERA 7-1/16" 5KANNULAR, BLINDS/ SHEARS, 2-3/8" PIPE/ SLIP, MUD X, 2-3/8" x 3-1/2" VARIABLE, 2-3/8" PIPE/ SLIP TEST #1: IRV, PACKOFF, C9 BACKWARDS, C10 BACKWARDS PASS Printed 1/7/2020 10:12 02AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 3 of 7 Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) i (usft) 12/13/2019 00:00 04:30 4.50 BOPSUR P 12,136.00 RUNPRD CONTINUED: BI -WEEKLY BOPE TEST PER AOGCC , BP, CRITERIA. TEST WITNESSED BYAOGCC REP HERRERA (MATTHEW 7-1/16" 5KANNULAR, BLINDS/ SHEARS, 2-3/8" PIPE/ SLIP, MUD X, 2-3/8" x 3-1/2" VARIABLE, 2-3/8" PIPE/ SLIP TEST ALL GAS ALARMS AND PVT TEST #2: BLIND / SHEAR, R1, BL1A, B1, B4 PASS REMOVE INJECTOR, INSTALL TEST JOINT FOR TESTING 2-3/8" TEST #3: ANNULAR (2-3/8"), TIW#1, B3, B2, BL1 PASS TEST #4: UPPER 2-3/8" PIPE/SLIP, TIW#2, BL2, R2, T2, C15 PASS -TEST #5: C16, T1, C11 PASS TEST #6: VARIABLES (2-3/811), C7, C9, C10, TV2 PASS TEST #7: LOWER 2-3/8" PIPE /SLIP, C5, C6, C8, TV1 PASS TEST #8: CHOKE A, CHOKE C PASS LTEST #9: C1, C4 PASS TEST #10: C2, C3 PASS {- - PERFORM ACCUMULATOR DRAW DOWN TEST. _ 04.30 10.30 6.00 CASING P 12,136.00 RUNPRD CIRCULATE COIL OVER TO 8.8 PPG INSTALL DRILLING RISERS AND PRESSURE TEST, GOOD. FINISH STRAPPING PIPE IN SHED AND _ RIGGING UP ECKEL TONGS. 10:30 14:30 4.00 CASING P 12,136.00 RUNPRD PJSM FOR MAKING UP LINER STRING. M/U LINER AS PER APPROVED TALLY. 14:30 15:00 0.50 CASING P 1 0RI UNPRD CHANGE IS MADE TO RUNNING ORDER. ROLL 2 MORE JOINTS PH -6 INTO SHED AND STRAP. REVISE TALLY, PJSM WITH CREW TO RECALL OLD TALLY SHEETS AND DISTRIBUTE NEW ONES. SHIFT PIPE FLAGGING WITH DRILLER AND WSL, RECOUNT JOINTS. 15:00 21:30 6.50CASING I P 12,136.00 RUNPRD 'CONTINUE M/U LINER. VERIFY COUNT IN THE SHED. EXECUTE STRIP OVER PROCEDURE. SPACE OUT IS 2.4' 21:30 00.00 2.50 CASING P 12,136.00 RUNPRD RUN LINER ON COIL PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES INJECTOR ON: 21:10 MUD WEIGHT: 8.97 PPG IN, 9.4 PPG OUT RATE: 0.25 BPM IN, 0.70 BPM OUT. CIRC PRESSURE: 1241 PSI START SWAPPING WELLBORE BACK TO DRILLING SYSTEM. RIH TO YELLOW FLAG AT 9527.01' CORRECT DEPTH TO 9415,061 -42' CORRECTION CONTINUE THROUGH WINDOW AND BY 1 ST BILLET Printed 1/7/2020 10:12:02AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 7 Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 - - Project: PBU Site: J - Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) - 1- 12/14/2019 00:00 - 04:00 4.00 CASING P 12,136.00 - RUNPRD -- -- WORKING LINER START SEEING 3-1/4" STANDOFF CONNECTORS HITTING SHALE. WORK LINER STARTING 10380' MANIPULATE PUMPS AND PICKUPS. SETTING DOWN ROUGHLY EVERY -30'. PUMP 10 BBLS SPACER / 30 BBLS LVT / 10 BBLS SPACER. PUMPED 5 BBLS LVT OUT. RIH TO 11064' WORKED DOWN TO 11108'. CONTINUE TO CIRCULATE AT WORK THE R&R TOOL. N LUCK. -CIRCULATE IN COMPRESSION. SHOWING SIGNS OF PACKING OFF. WORK BACKUP TO RATE. -CIRCULATE SPACERS/ LVT OUT. LOST ABOUT 6 BBLS. ONCE PILLS OUT. COME OFFLINE. ATTEMPT TO MOVE LINER. NO LUCK. -REGAIN PUMP PRESSURE AND 1:1 RATE. PREP TO PUMP LVT AGAIN. 04:00 09:00 5.00 CASING P 12,136.00 RUNPRD ICE IN LINE COMING OFF LVT TRAILER. GET HEATER ON IT TO THAW OUT. HOSE IS FROZEN KNOCK IT OFF AND BRING 'INSIDE. CALL FOR 40 BBLS LVT ON MINI VAC. CONTINUE THAWING HOSE AND VALVE WHILE WAITING FOR LVT. T MIX BEADED SPACER FOR NEXT LVT PILL. 09:00 12:00 3.00 CASING P 12,136.00 RUNPRD PUMP 20 BBLS BEADED KCL SPACER, 38 BBLS LVT, 20 BBLS BEADED KCL SPACER. WITH 5 BBLS OUT GO TO MIN RATE, PICK UP 85K NO MOVEMENT. PUMP 5 MORE OUT (10 TOTAL) AND LET SOAK 5 MIN. PICK UP 90K NO MOVEMENT. PUMP 5 MORE OUT (15 TOTAL) AND LET SOAK 10 MIN. PICKUP 90K NO MOVEMENT. PUMP 5 MORE OUT (20 TOTAL) LET SOAK 15 MIN. PICK UP 90K NO MOVEMENT. 11:30 - CALL SLB CEMENT CREW OUT. PUMP 10 MORE OUT (30 TOTAL) LET SOAK 10 MIN. PICK UP 90K NO MOVEMENT. PUMP LAST 8 LVT OUT LET SOAK 15 MIN, PICK UP 83K NO MOVEMENT. PUMP 15 BBLS BEADS OUT AND PICK UP 90K, NO MOVEMENT. 12:00 13:30 1.50 CASING P 12,136.00 RUNPRD CIRC LVT AND SPACERS OUT TO TIGER TANK. 13:30 14 30 1.00 CASING P 12,136.00 RUNPRD PJSM FOR LAUNCHING BALL. DROP 3/4" BALL, LAUNCH WITH 2500 PSI. BALL ISN'T HEARD ROLLING, RE -LAUNCH WITH 3000 PSI. BALLON SEAT AT 45 BBLS, SHEARS OUT AT 4500 PSI. GET 2 PICKUPS, BREAKOVER WEIGHT IS 40K. Printed 1/7/2020 10:12 02AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Well Name J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Page 5 of 7 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM 'Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs TaskCode NPT Total Depth Phase Description of Operations (hr) I I (usft) 14:30 17:00 2.50 CASING P t 12,136.00 RUNPRD CIRCULATE WELL OVER TO KCL. AFTER 78 BBLS AWAY PUMP PRESSURE INCREASING, PARTIAL LOSS OF RETURNS. NO WHP INCREASE. REDUCE PUMP AND TRY TO REGAIN 1:1. GET FULL RETURNS BACK, CONTINUE CIRCULATING. WITH KCLALL THE WAY AROUND PUMP 1.6 / _ BPM AT 1730 PSI. 17:00 19:30 2.50 CASING P 12,136.00 RUNPRD SEND SLB KCL WATER FOR PT. REVIEW PRESSURE XCHECK CARD WITH WSL AND SLB PUMP OPERATOR SCOTT. WITNESS LOW PRESSURE TRIPS. PRESSURE TEST CEMENT LINES TO 4900 PSI AGAINST OUTSIDE VALVE. PJSM WITH NABORS AND SLB CREW FOR PUMPING CEMENT. BATCH UP 25 BBLS OF CEMENT. PUMP 25 BBLS OF CEMENT INTO REEL THEN SLB SHUT DOWN. CLEAN UP LINES TO SLB 'VAN. DISPLACE CEMENT WITH RIG PUMP. AT 78.6 BBLS ON THE IN MM ZERO THE OUT MM. AT 78.7 BBLS SHUT DOWN PUMP. PICK UP TO BREAKOVER + 16'. STACK BACK DOWN, NOW 14' HIGHER. ROLL PUMP TO LAND PEE -WEE AT 1500 PSI. P/U 2 FT AND PUMP SIDE EXHAUST TOTAL BBLS. OPEN PUMP BLEEDER AND SET BACK DOWN. CLOSE PUMP BLEEDER AND PRESSURE UP TO 4700 PSI TO LAUNCH LWP. DISPLACE 1.5 / 1 BPM AT 4000 PSI. PRESSURE AND RETURNS FLUCTUATING. BUMP PLUG AT 22.0 BBLS. TOTAL OF 9.3 BBLS CEMENT BEHIND PIPE (PVT) , 9.35 BBL ON OUT MM. BLEED PRESSURE, CHECK FLOATS. GOOD TEST. --- 19 30 22 30 3.00 CASING P 12,136.00 RUNPRD CIRCULATE - PRESSURE UP TO 1500#. PU LRT TILL PRESSURE DROPPED. CIRCULATED 30 BBLS OF EXHAUST AT LINER TOP PRIOR TO UNSTINGING COMPLETELY 3.03 BPM IN RATE / 3.09 BPM OUT RATE. SEE EXHAUST CEMENTAT SURFACE. NO LINER TOP CEMENT. SLOWLY UNSTING. SWAP TO 1% KCL. PERFORM 10 MIN FLOW CHECK. WELL STATIC. 22:30 00:00 1.50 CASING P 12,136.00 RUNPRD LRT BHA LAY DOWN 6 JOINTS 2-3/8" BTS -6 LAY DOWN 8 3-1/8" DRILL COLLARS LAY DOWN BCTLRT RUNNING TOOL RECOVERED 3/4" STEEL BALL Printed 1/7/2020 10:12 02AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 6 of 7 Operation Summary Report Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - --- --- (hr) (U -ft) 12/15/2019 00:00 07:00 7.00 PERFOB P 11,107.00 OTHCMP PREPARE FOR PERFORATING INSTALL SLIMHOLE COIL CONNECTOR. PULL TEST TO 40K. GOOD TEST. PRESSURE TEST TO 3500#. REBUILD DRILLING CHOKE, SNAKE MICRO MOTION OUT. FILL FULL OF FRESHWATER. CALIBRATE. CLEAN AND CLEAR RIG FLOOR IN PREPARATION FOR PERFORATING WAIT ON PERF GUNS. 07 00 10:00 3.00 PERFOB P 11,107.00 OTHCMP ' LOAD PERF GUNS INTO SHED. PROGRAM FIRING HEAD. PJSM WITH HES AND NABORS CREW FOR WU PERF GUNS. M/U PERF GUNS AS PER FINAL PERF MEMO. M/U INJECTOR, PT QTS TO 3500 PSI, GOOD. 10:00 14:30 4.50 PERFOB P 11,107.00 OTHCMP RIH BHA#15. SLOW DOWN FOR ALL GLM. ENTER LINER TOP CAREFULLY, NOTHING SEEN. UP WEIGHT AT 11 000'IS 51 K. LIGHT TAG AT 11097'. PICK UP AND REPEAT. CIRCULATE NEAR BOTTOM, WAIT FOR 14:30 FOR CEMENT TO GAIN COMPRESSIVE STRENGTH. WHILE SWAPPING FROM HIGHLINE TO GENERATORS, PIT MODULE GOES DARK. REGAIN POWER IN PIT MODULE, CONTINUE _ CIRCULATION. 14.30 15:00 0.50 PERFOB P 11,107.00 OTHCMP LIGHT TAG AT PBTD AND CORRECT DEPTH 10'. START SERIES OF UPWARDS MOTIONS TO ACTIVATE MAXFIRE HEAD. GET GOOD SHOT INDICATION FROM I ACOUSTIC, FLUID LOSS. I PERFORATED INTERVAL: 10630'- 10960' 15:00 19:00 4.00 PERFOB P 11,107.00 OTHCMP POOH, KEEP 280 PSI WHP WHILE INSIDE LINER, POOH SPEED < 60 FT / MIN. PULLABOVE LINER TOP, BLEED OFF WHP AND SHUT DOWN PUMP. 10 MIN FLOWCHECK HERE IS GOOD. CONTINUE POOH. JOG AT SURFACE, RETURNS OUT TO TIGER TANK. PERFORM 10 MIN FLOW CHECK. WELL STATIC 19.00 2030 1.50 PERFOB P 11,107.00 OTHCMP PJSM WITH TCP - LAY DOWN (2) 2-1/16" CSH DISCONNECT, DFCV, BALL DROP FIRING HEAD. PICKUP AND VERIFIED SHOTS FIRED LAID DOWN GUN#11 LAID DOWN 20.8' OF GUN#10 FISH IN HOLE. 317.47' OF FIRED GUNS / FIRING HEAD - DISCUSS WITH ODE AND ACTING WSUPT. DECISION TO LEAVE IN HOLE. Printed 1/7/2020 10 12 02AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 7 of 7 Common Well Name: J-09 Event Type: COM- ONSHORE (CON) Start Date: 12/11/2019 End Date: 12/16/2019 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 7/18/1977 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000374 Active datum: KB @75.02usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 20:30 23:30 3.00 RIGD P 11,107.00 POST INJECTIVITYTEST WELL PRESSURING UP. MINIMAL INJECTIVITY. RU LRS ON CEMENT LINE PT TO 4000#. RI WITH NOZZLE LOAD COIL WITH 44 BBLS DIESEL/ 5 BBLS NEET METHANOL CIRCULATE DIESEL TO SURFACE FROM 12250' MD. CLOSE CHOKE. POOH PUMPING PIPE DISPLACEMENT. - PAUSEAT 100' MD. SPOT NEET METHANOL FROM 100' TO SURFACE_. PO.OH 23:30 00:00 0.50 RIGD P 11,107.00 POST TAG UP. - GREASE SERVICE TREE. CLOSE BOTH MASTER VALVES. - RU HES N2 PUMPERS. PT TO 4000#. SET 'TRIPS. TEST. 12/16/2019 00:00 02:30 2.50 RIGD P 11,107.00 POST REEL BLOWDOWN PUMPED 20,000 SCF AT 1500 SCF/ MIN. BLEED DOWN. 02:30 - 05:00 2.50 RIGD P 11,107.00 POST INSTALL GRAPPLE - PULL TEST PULL COIL BACK TO REELAND SECURE FOR REEL SWAP. 05:00 08:00 3.00 RIGD P 11,107.00 POST LOWER OLD REEL OUT, LIFT NEW REEL INTO POSITION. 08:00 10:00 2.00 RIGD P 11,107.00 POST CLOSE BAY DOORS. PREP CT FOR GRAPPLE. INSTALL GRAPPLE. 10:00 15:30 5.50 RIGD P 11,107.00 POST PJSM FOR STABBING PIPE. PULL TEST GRAPPLE AND INSPECT. PULL CT ACROSS PIPE SHED INTO INJECTOR. REMOVE BOP STACKAND INSTALL TREE CAP. LEAK TIGHT TEST ON TREE CAP IS GOOD. RELEASE RIG AT 15:30. ALL FURTHER ENTRIES ON J -17E. Printed 117/2020 10.12:02AM **All depths reported in Drillers Depths" North America - ALASKA - BP PBU J-09 J -09C 500292025103 Design: J -09C Final Survey Report 11 December, 2019 Baker S Hughes BP bp Final Survey Report Hug9hes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J -09C Design: J -09C Local Coordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A/ B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site J, TR -11-13 Site Position: +N/ -S From: Map Position Uncertainty: 0.00 usft Well J-09, J-09 Well Position +NI -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore J -09C Magnetics Model Name BGGM2018 Design J -09C Audit Notes: Version: 1.0 Vertical Section: Sample Date 12/1/2019 Northing: Easting: Slot Radius: Northing: Easting: Wellhead Elevation Declination 16.53 Phase: ACTUAL Depth From (TVD) +N/ -S (usft) (usft) 33.80 0.00 5,968,224.220 usft 641,155.790 usft 0.000 in 5,970,105.460 usft 643,558.670 usft 41.22 usft Dip Angle 80.91 Tie On Depth +E/ -W (usft) 0.00 Latitude: 700 19' 14.845 N Longitude: 148° 51'20.092 W Grid Convergence: 1.08 ' Latitude: 700 19' 32.897 N Longitude: 1480 50'8.927 W Ground Level: 41.16 usft Field Strength (nT) 57,403.99344046 10, 551.41 Direction (°1 181.68 12/11/2019 2.35.59PM Page 2 COMPASS 5000.15 Build 90 BP b Baker V---1 p Final Survey Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J -09C Survey Calculation Method: Minimum Curvature Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 12/11/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 9,455.00 9,632.44 Survey #1 (J-09CP81) MWD MWD - Standard 9,650.00 10,551.41 Survey #1 (J-09CPB2) MWD MWD - Standard 10,564.00 12,136.00 Survey #1 (J -09C) MWD MWD - Standard Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 33.80 0.00 0.00 33.80 -41.22 0.00 0.00 5,970,105.460 643,558.670 0.00 0.00 101.05 0.05 157.63 101.05 26.03 -0.03 0.01 5,970,105.433 643,558.682 0.07 0.03 201.05 0.17 188.54 201.05 126.03 -0.21 0.01 5,970,105.246 643,558.680 0.13 0.21 301.05 0.25 193.73 301.05 226.03 -0.57 -0.07 5,970,104.886 643,558.613 0.08 0.57 401.05 0.27 193.00 401.05 326.03 -1.01 -0.17 5,970,104.443 643,558.517 0.02 1.02 501.05 0.32 198.90 501.05 426.03 -1.51 -0.32 5,970,103.946 643,558.383 0.06 1.52 601.05 0.33 201.61 601.05 526.03 -2.04 -0.51 5,970,103.411 643,558.196 0.02 2.05 701.05 0.42 177.51 701.04 626.02 -2.67 -0.60 5,970,102.775 643,558.118 0.18 2.69 801.05 0.42 173.29 801.04 726.02 -3.40 -0.54 5,970,102.046 643,558.191 0.03 3.42 901.05 0.47 166.22 901.04 826.02 -4.17 -0.40 5,970,101.287 643,558.346 0.07 4.18 1,001.05 0.25 169.31 1,001.04 926.02 -4.78 -0.27 5,970,100.677 643,558.496 0.22 4.78 1,101.05 0.07 163.95 1,101.03 1,026.01 -5.05 -0.21 5,970,100.405 643, 558.559 0.18 5.06 1,201.05 0.25 33.06 1,201.03 1,126.01 -4.93 -0.07 5,970,100.532 643, 558.692 0.30 4.93 1,301.05 0.25 7.08 1,301.03 1,226.01 -4.53 0.07 5,970,100.934 643,558.830 0.11 4.52 1,401.05 0.08 340.59 1,401.03 1,326.01 -4.25 0.08 5,970,101.216 643,558.829 0.18 4.24 1,501.05 0.35 358.68 1,501.03 1,426.01 -3.88 0.05 5,970,101.587 643,558.791 0.28 3.87 1,601.05 0.33 346.80 1,601.03 1,526.01 -3.29 -0.03 5,970,102.171 643,558.707 0.07 3.29 1,701.05 0.17 323.00 1,701.03 1,626.01 -2.89 -0.18 5,970,102.567 643,558.545 0.19 2.89 1,801.05 0.23 98.93 1,801.03 1,726.01 -2.80 -0.07 5,970,102.656 643,558.652 0.37 2.80 12/11/2019 2:35:59PM Page 3 COMPASS 5000.15 Build 90 ?,�+ BP _ b p Final Survey Report Baker I�+a Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A/ B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J -09C Survey Calculation Method: Minimum Curvature Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,901.05 0.23 142.79 1,901.03 1,826.01 -2.99 0.25 5,970,102.471 643,558.975 0.17 2.99 2,001.05 0.18 147.00 2,001.03 1,926.01 -3.29 0.45 5,970,102.184 643,559.188 0.05 3.27 2,101.05 0.67 151.20 2,101.03 2,026.01 -3.93 0.82 5,970,101.547 643,559.567 0.49 3.90 2,201.05 0.42 163.94 2,201.02 2,126.00 -4.79 1.21 5,970,100.690 643,559.967 0.28 4.76 2,301.05 0.30 164.10 2,301.02 2,226.00 -5.40 1.38 5,970,100.089 643,560.151 0.12 5.36 2,401.05 0.62 171.77 2,401.02 2,326.00 -6.19 1.53 5,970,099.305 643,560.315 0.33 6.14 2,501.05 0.63 174.53 2,501.01 2,425.99 -7.27 1.66 5,970,098.225 643,560.466 0.03 7.22 2,601.05 0.32 156.49 2,601.01 2,525.99 -8.07 1.82 5,970,097.425 643,560.645 0.34 8.01 2,701.05 0.50 140.10 2,701.00 2,625.98 -8.66 2.21 5,970,096.842 643,561.047 0.21 8.59 2,801.05 0.50 128.94 2,801.00 2,725.98 -9.27 2.83 5,970,096.245 643,561.678 0.10 9.18 2,901.05 1.08 138.80 2,900.99 2,825.97 -10.26 3.79 5,970,095.280 643,562.657 0.59 10.14 3,001.05 1.77 166.27 3,000.96 2,925.94 -12.46 4.78 5,970,093.090 643,563.686 0.95 12.32 3,101.05 5.33 195.17 3,100.76 3,025.74 -18.45 3.93 5,970,087.090 643,562.952 3.88 18.33 3,201.05 6.83 212.68 3,200.20 3,125.18 -27.94 -0.50 5,970,077.519 643,558.708 2.37 27.94 3,301.05 8.15 219.30 3,299.35 3,224.33 -38.43 -8.20 5,970,066.884 643,551.210 1.57 38.65 3,401.05 10.15 222.24 3,398.07 3,323.05 -50.44 -18.61 5,970,054.678 643,541.028 2.05 50.96 3,501.05 12.83 224.93 3,496.06 3,421.04 -64.83 -32.38 5,970,040.032 643,527.540 2.73 65.75 3,601.05 15.88 226.70 3,592.92 3,517.90 -82.07 -50.18 5,970,022.448 643,510.072 3.08 83.51 3,701.05 18.43 226.34 3,688.47 3,613.45 -102.37 -71.58 5,970,001.745 643,489.070 2.55 104.43 3,801.05 21.75 226.51 3,782.37 3,707.35 -126.04 -96.46 5,969,977.604 643,464.645 3.32 128.82 3,901.05 24.33 227.38 3,874.39 3,799.37 -152.75 -125.07 5,969,950.359 643,436.558 2.60 156.36 4,001.05 27.37 226.55 3,964.37 3,889.35 -182.51 -156.92 5,969,919.993 643,405.282 3.06 187.05 4,101.05 30.00 227.72 4,052.09 3,977.07 -215.15 -192.11 5,969,886.695 643,370.724 2.69 220.70 4,201.05 31.08 228.37 4,138.22 4,063.20 -249.11 -229.90 5,969,852.014 643,333.593 1.13 255.76 4,301.05 31.00 228.43 4,223.90 4,148.88 -283.35 -268.46 5,969,817.050 643,295.699 0.09 291.12 4,401.05 30.80 227.83 4,309.70 4,234.68 -317.62 -306.70 5,969,782.053 643,258.123 0.37 326.50 4,501.05 31.05 228.09 4,395.49 4,320.47 -352.04 -344.87 5,969,746.918 643,220.623 0.28 362.02 12/11/2019 2:35:59PM Page 4 COMPASS 5000.15 Build 90 Survey MD BP Azi TVD 'ell,4000 NIS E/W Northing Baker f p Final Survey Report (usft) Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 (usft) Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) (°/100usft) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) 228.64 Well: J-09 North Reference: True -383.54 Wellbore: J -09C Survey Calculation Method: Minimum Curvature 397.52 Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 4,566.33 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,601.05 31.27 228.64 4,481.06 4,406.04 -386.41 -383.54 5,969,711.810 643,182.619 0.36 397.52 4,701.05 31.72 228.43 4,566.33 4,491.31 -421.01 -422.69 5,969,676.477 643,144.143 0.46 433.25 4,801.05 32.22 228.98 4,651.16 4,576.14 -455.95 -462.47 5,969,640.785 643,105.040 0.58 469.34 4,901.05 32.50 229.23 4,735.63 4,660.61 -490.99 -502.93 5,969,604.980 643,065.262 0.31 505.56 5,001.05 32.73 229.79 4,819.86 4,744.84 -525.98 -543.92 5,969,569.208 643,024.951 0.38 541.75 5,101.05 32.68 230.28 4,904.01 4,828.99 -560.69 -585.33 5,969,533.720 642,984.214 0.27 577.65 5,201.05 32.83 230.72 4,988.11 4,913.09 -595.10 -627.08 5,969,498.516 642,943.135 0.28 613.28 5,301.05 32.87 231.35 5,072.12 4,997.10 -629.21 -669.26 5,969,463.607 642,901.622 0.34 648.62 5,401.05 32.65 231.48 5,156.21 5,081.19 -662.96 -711.56 5,969,429.058 642,859.980 0.23 683.59 5,501.05 32.60 230.84 5,240.43 5,165.41 -696.77 -753.55 5,969,394.452 642,818.645 0.35 718.62 5,601.05 32.65 230.93 5,324.66 5,249.64 -730.79 -795.38 5,969,359.648 642,777.476 0.07 753.85 5,701.05 32.17 232.11 5,409.08 5,334.06 -764.14 -837.33 5,969,325.502 642,736.171 0.79 788.42 5,801.05 32.18 231.97 5,493.72 5,418.70 -796.89 -879.32 5,969,291.952 642,694.824 0.08 822.40 5,901.05 31.65 231.91 5,578.61 5,503.59 -829.48 -920.94 5,969,258.573 642,653.833 0.53 856.20 6,001.05 31.25 231.56 5,663.91 5,588.89 -861.79 -961.91 5,969,225.487 642,613.496 0.44 889.70 6,101.05 30.75 231.65 5,749.63 5,674.61 -893.78 -1,002.28 5,969,192.735 642,573.753 0.50 922.86 6,206.80 25.82 219.10 5,842.81 5,767.79 -928.48 -1,038.06 5,969,157.361 642,538.646 7.28 958.60 6,300.13 23.75 224.40 5,927.55 5,852.53 -957.69 -1,064.03 5,969,127.664 642,513.238 3.25 988.55 6,393.83 22.73 220.20 6,013.65 5,938.63 -985.00 -1,088.92 5,969,099.885 642,488.878 2.08 1,016.58 6,479.80 22.53 219.20 6,093.00 6,017.98 -1,010.45 -1,110.05 5,969,074.038 642,468.241 0.50 1,042.64 6,573.43 22.43 221.60 6,179.52 6,104.50 -1,037.71 -1,133.25 5,969,046.342 642,445.571 0.99 1,070.57 6,666.54 22.12 220.60 6,265.68 6,190.66 -1,064.30 -1,156.45 5,969,019.311 642,422.884 0.53 1,097.84 6,760.76 21.72 221.50 6,353.09 6,278.07 -1,090.83 -1,179.54 5,968,992.350 642,400.301 0.55 1,125.03 6,855.36 21.35 221.40 6,441.09 6,366.07 -1,116.86 -1,202.53 5,968,965.890 642,377.818 0.39 1,151.72 6,946.09 22.30 221.60 6,525.31 6,450.29 -1,142.12 -1,224.88 5,968,940.207 642,355.956 1.05 1,177.63 7,040.51 22.69 221.60 6,612.55 6,537.53 -1,169.13 -1,248.87 5,968,912.741 642,332.494 0.41 1,205.34 7,142.84 21.63 222.60 6,707.32 6,632.30 -1,197.77 -1,274.74 5,968,883.610 642,307.178 1.10 1,234.73 12/11/2019 2:35:59PM Page 5 COMPASS 5000.15 Build 90 BP p Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J -09C Survey Calculation Method: Minimum Curvature Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,236.75 22.47 223.60 6,794.36 6,719.34 -1,223.51 -1,298.83 5,968,857.419 642,283.585 0.98 1,261.16 7,330.51 21.61 219.50 6,881.27 6,806.25 -1,249.81 -1,322.17 5,968,830.679 642,260.754 1.88 1,288.14 7,423.71 20.25 221.90 6,968.32 6,893.30 -1,275.06 -1,343.86 5,968,805.022 642,239.553 1.72 1,314.02 7,509.74 21.40 224.30 7,048.73 6,973.71 -1,297.38 -1,364.76 5,968,782.312 642,219.080 1.66 1,336.94 7,604.62 21.22 227.10 7,137.13 7,062.11 -1,321.45 -1,389.43 5,968,757.769 642,194.878 1.09 1,361.73 7,695.33 21.98 223.70 7,221.47 7,146.45 -1,344.90 -1,413.19 5,968,733.871 642,171.578 1.61 1,385.87 7,797.54 22.89 215.10 7,315.97 7,240.95 -1,375.00 -1,437.84 5,968,703.307 642,147.508 3.33 1,416.68 7,890.36 22.56 216.20 7,401.58 7,326.56 -1,404.14 -1,458.74 5,968,673.777 642,127.175 0.58 1,446.42 7,977.39 22.15 218.10 7,482.07 7,407.05 -1,430.52 -1,478.72 5,968,647.018 642,107.701 0.95 1,473.38 8,070.65 21.82 227.40 7,568.58 7,493.56 -1,456.10 -1,502.33 5,968,620.999 642,084.583 3.75 1,499.63 8,172.84 21.70 229.50 7,663.49 7,588.47 -1,481.22 -1,530.68 5,968,595.338 642,056.725 0.77 1,525.58 8,267.31 21.69 242.90 7,751.32 7,676.30 -1,500.53 -1,559.52 5,968,575.484 642,028.263 5.23 1,545.73 8,360.20 21.21 254.00 7,837.81 7,762.79 -1,512.99 -1,590.96 5,968,562.429 641,997.063 4.39 1,559.10 8,453.79 20.82 271.50 7,925.26 7,850.24 -1,517.22 -1,623.90 5,968,557.565 641,964.219 6.70 1,564.30 8,547.79 23.28 275.30 8,012.38 7,937.36 -1,515.07 -1,659.10 5,968,559.045 641,928.984 3.02 1,563.19 8,630.66 23.58 276.80 8,088.42 8,013.40 -1,511.59 -1,691.87 5,968,561.892 641,896.161 0.81 1,560.68 8,725.82 24.28 280.20 8,175.41 8,100.39 -1,505.87 -1,730.02 5,968,566.879 641,857.904 1.62 1,556.08 8,819.57 26.98 292.50 8,259.98 8,184.96 -1,494.31 -1,768.68 5,968,577.699 641,819.041 6.35 1,545.66 8,922.39 30.27 299.80 8,350.25 8,275.23 -1,472.50 -1,812.74 5,968,598.667 641,774.573 4.66 1,525.15 9,005.62 34.43 303.00 8,420.56 8,345.54 -1,449.24 -1,850.69 5,968,621.187 641,736.182 5.40 1,503.02 9,100.29 36.67 305.60 8,497.58 8,422.56 -1,418.21 -1,896.13 5,968,651.348 641,690.161 2.85 1,473.33 9,201.95 37.30 305.80 8,578.78 8,503.76 -1,382.52 -1,945.80 5,968,686.078 641,639.825 0.63 1,439.12 9,294.74 38.07 307.30 8,652.22 8,577.20 -1,348.73 -1,991.36 5,968,718.981 641,593.629 1.29 1,406.69 9,386.89 38.09 307.50 8,724.75 8,649.73 -1,314.21 -2,036.51 5,968,752.628 641,547.831 0.14 1,373.51 9,417.00 38.00 304.00 8,748.47 8,673.45 -1,303.38 -2,051.56 5,968,763.175 641,532.573 7.17 1,363.12 9,455.00 38.94 305.49 8,778.22 8,703.20 -1,289.90 -2,070.99 5,968,776.275 641,512.899 3.47 1,350.22 9,479.75 35.74 311.36 8,797.90 8,722.88 -1,280.60 -2,082.75 5,968,785.345 641,500.959 19.33 1,341.28 12/11/2019 2.35:59PM Page 6 COMPASS 5000.15 Build 90 400 BP p Final Survey Report Baker 'i Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J -09C Survey Calculation Method: Minimum Curvature Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 9,513.84 26.58 320.64 8,827.06 8,752.04 -1,268.09 -2,095.09 5,968,797.615 641,488.380 30.27 1,329.14 9,540.29 25.95 328.83 8,850.79 8,775.77 -1,258.56 -2,101.84 5,968,807.013 641,481.449 13.90 1,319.81 9,570.29 29.97 339.04 8,877.29 8,802.27 -1,245.94 -2,107.93 5,968,819.520 641,475.125 20.80 1,307.37 9,600.58 31.53 355.76 8,903.37 8,828.35 -1,230.95 -2,111.23 5,968,834.445 641,471.541 28.61 1,292.48 9,632.44 34.77 7.65 8,930.07 8,855.05 -1,213.61 -2,110.63 5,968,851.786 641,471.803 22.76 1,275.13 9,650.00 37.33 15.44 8,944.28 8,869.26 -1,203.51 -2,108.55 5,968,861.925 641,473.695 29.88 1,264.97 9,681.89 47.73 7.95 8,967.76 8,892.74 -1,182.43 -2,104.33 5,968,883.078 641,477.511 36.23 1,243.78 9,710.47 55.10 12.26 8,985.58 8,910.56 -1,160.47 -2,100.37 5,968,905.110 641,481.048 28.34 1,221.71 9,740.90 63.43 16.67 9,001.12 8,926.10 -1,135.19 -2,093.80 5,968,930.513 641,487.130 30.07 1,196.25 9,771.02 70.89 23.05 9,012.81 8,937.79 -1,109.13 -2,084.34 5,968,956.744 641,496.086 31.52 1,169.92 9,801.06 77.37 29.13 9,021.03 8,946.01 -1,083.22 -2,071.63 5,968,982.892 641,508.303 29.05 1,143.65 9,830.45 84.07 35.48 9,025.77 8,950.75 -1,058.74 -2,056.13 5,969,007.663 641,523.328 31.21 1,118.72 9,860.01 90.25 42.69 9,027.24 8,952.22 -1,035.85 -2,037.53 5,969,030.900 641,541.481 32.09 1,095.30 9,890.79 90.43 52.34 9,027.06 8,952.04 -1,015.09 -2,014.86 5,969,052.092 641,563.750 31.36 1,073.88 9,921.97 90.31 62.18 9,026.85 8,951.83 -998.24 -1,988.67 5,969,069.431 641,589.615 31.56 1,056.27 9,950.47 89.17 71.30 9,026.98 8,951.96 -987.00 -1,962.51 5,969,081.171 641,615.548 32.25 1,044.27 9,980.93 90.40 80.77 9,027.10 8,952.08 -979.66 -1,932.99 5,969,089.076 641,644.925 31.35 1,036.06 10,011.08 89.45 85.48 9,027.14 8,952.12 -976.05 -1,903.06 5,969,093.256 641,674.773 15.94 1,031.57 10,041.17 88.96 90.32 9,027.56 8,952.54 -974.95 -1,873.01 5,969,094.933 641,704.802 16.17 1,029.59 10,070.86 90.09 93.82 9,027.80 8,952.78 -976.02 -1,843.34 5,969,094.428 641,734.479 12.39 1,029.79 10,100.49 89.48 99.60 9,027.91 8,952.89 -979.48 -1,813.93 5,969,091.531 641,763.952 19.62 1,032.38 10,130.77 91.11 104.34 9,027.76 8,952.74 -985.76 -1,784.32 5,969,085.821 641,793.676 16.55 1,037.79 10,160.50 91.87 107.98 9,026.98 8,951.96 -994.03 -1,755.77 5,969,078.100 641,822.367 12.50 1,045.21 10,190.58 90.43 112.09 9,026.38 8,951.36 -1,004.33 -1,727.53 5,969,068.342 641,850.804 14.47 1,054.68 10,222.88 89.85 117.25 9,026.30 8,951.28 -1,017.81 -1,698.19 5,969,055.429 641,880.396 16.08 1,067.29 10,252.14 88.87 120.46 9,026.63 8,951.61 -1,031.93 -1,672.56 5,969,041.805 641,906.282 11.47 1,080.65 10,280.76 90.46 124.07 9,026.79 8,951.77 -1,047.20 -1,648.37 5,969,026.997 641,930.763 13.78 1,095.21 12/11/2019 2:35:59PM Page 7 COMPASS 5000.15 Build 90 Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J -09C Design: J -09C Survey MD (usft) 10, 310.68 10, 340.79 10, 370.89 10,400.69 10,430.42 10,464.14 10,491.02 10, 520.69 10, 551.41 Tie-in point 10, 564.00 KOP - Top of Billet 10, 591.95 10, 621.68 10,653.22 10,681.55 10,701.17 10, 731.06 10, 761.21 10, 791.37 10, 820.33 10, 850.74 10,880.79 10, 910.82 10, 940.67 10, 970.13 11, 000.05 BP Final Survey Report Local Co-ordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A / B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Baker Hughes Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 91.63 122.37 9,026.25 8,951.23 -1,063.59 -1,623.34 5,969,011.092 641,956.095 6.90 1,110.85 91.07 119.06 9,025.54 8,950.52 -1,078.96 -1,597.47 5,968,996.218 641,982.257 11.15 1,125.46 90.09 117.22 9,025.23 8,950.21 -1,093.16 -1,570.93 5,968,982.535 642,009.061 6.93 1,138.86 88.10 112.89 9,025.71 8,950.69 -1,105.77 -1,543.94 5,968,970.440 642,036.280 15.99 1,150.68 90.25 110.94 9,026.13 8,951.11 -1,116.86 -1,516.37 5,968,959.876 642,064.061 9.76 1,160.96 89.29 107.54 9,026.27 8,951.25 -1,127.97 -1,484.54 5,968,949.378 642,096.097 10.48 1,171.13 88.74 105.02 9,026.73 8,951.71 -1,135.51 -1,458.74 5,968,942.340 642,122.030 9.59 1,177.90 89.39 105.13 9,027.22 8,952.20 -1,143.22 -1,430.10 5,968,935.175 642,150.816 2.22 1,184.77 87.54 102.00 9,028.04 8,953.02 -1,150.43 -1,400.25 5,968,928.546 642,180.793 11.83 1,191.09 87.36 101.37 9,028.60 8,953.58 -1,152.97 -1,387.93 5,968,926.235 642,193.155 5.20 1,193.28 87.82 104.28 9,029.77 8,954.75 -1,159.17 -1,360.71 5,968,920.559 642,220.492 10.53 1,198.67 89.23 103.19 9,030.54 8,955.52 -1,166.23 -1,331.84 5,968,914.057 642,249.489 5.99 1,204.88 90.46 102.00 9,030.62 8,955.60 -1,173.10 -1,301.06 5,968,907.770 642,280.392 5.43 1,210.84 87.76 99.83 9,031.06 8,956.04 -1,178.47 -1,273.25 5,968,902.941 642,308.298 12.23 1,215.39 85.45 99.16 9,032.23 8,957.21 -1,181.70 -1,253.93 5,968,900.080 642,327.670 12.26 1,218.05 86.07 105.08 9,034.44 8,959.42 -1,187.95 -1,224.80 5,968,894.383 642,356.913 19.86 1,223.45 86.43 111.38 9,036.41 8,961.39 -1,197.36 -1,196.24 5,968,885.524 642,385.646 20.88 1,232.01 85.43 117.23 9,038.55 8,963.53 -1,209.74 -1,168.84 5,968,873.676 642,413.281 19.63 1,243.58 86.04 122.18 9,040.71 8,965.69 -1,224.04 -1,143.76 5,968,859.853 642,438.625 17.17 1,257.14 88.50 128.00 9,042.16 8,967.14 -1,241.50 -1,118.92 5,968,842.878 642,463.793 20.76 1,273.85 87.15 132.00 9,043.30 8,968.28 -1,260.80 -1,095.92 5,968,824.026 642,487.155 14.04 1,292.47 92.05 136.47 9,043.51 8,968.49 -1,281.73 -1,074.42 5,968,803.506 642,509.053 22.08 1,312.76 87.73 133.04 9,043.57 8,968.55 -1,302.74 -1,053.23 5,968,782.908 642,530.638 18.48 1,333.14 87.27 131.47 9,044.85 8,969.83 -1,322.53 -1,031.44 5,968,763.540 642,552.795 5.55 1,352.28 87.09 128.46 9,046.32 8,971.30 -1,341.72 -1,008.54 5,968,744.790 642,576.057 10.07 1,370.79 12/11/2019 2:35.59PM Page 8 COMPASS 5000.15 Build 90 bp BP Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J -09C Survey Calculation Method: Minimum Curvature Design: J -09C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND NDSS NIS ENV Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft (usft) 11,031.09 87.33 126.98 9,047.84 8,972.82 -1,360.69 -984.02 5,968,726.297 642,600.937 4.82 1,389.03 11,060.53 87.18 124.41 9,049.25 8,974.23 -1,377.85 -960.14 5,968,709.602 642,625.139 8.73 1,405.48 11,090.30 85.23 120.98 9,051.22 8,976.20 -1,393.89 -935.15 5,968,694.041 642,650.432 13.23 1,420.78 11,120.11 84.90 117.34 9,053.78 8,978.76 -1,408.36 -909.22 5,968,680.072 642,676.633 12.22 1,434.48 11,150.18 88.40 115.71 9,055.54 8,980.52 -1,421.76 -882.36 5,968,667.187 642,703.736 12.84 1,447.09 11,180.69 87.30 112.84 9,056.68 8,981.66 -1,434.30 -854.57 5,968,655.188 642,731.758 10.07 1,458.80 11,210.59 90.71 113.36 9,057.20 8,982.18 -1,446.02 -827.08 5,968,643.990 642,759.470 11.54 1,469.71 11,240.30 91.11 120.20 9,056.73 8,981.71 -1,459.40 -800.57 5,968,631.124 642,786.223 23.06 1,482.30 11,270.24 90.34 125.69 9,056.35 8,981.33 -1,475.67 -775.46 5,968,615.334 642,811.642 18.51 1,497.83 11,300.53 90.74 131.14 9,056.07 8,981.05 -1,494.49 -751.74 5,968,596.980 642,835.718 18.04 1,515.94 11,330.36 91.44 134.86 9,055.50 8,980.48 -1,514.82 -729.93 5,968,577.066 642,857.910 12.69 1,535.63 11,361.50 90.09 140.07 9,055.08 8,980.06 -1,537.76 -708.89 5,968,554.539 642,879.386 17.28 1,557.93 11,390.37 91.23 139.74 9,054.75 8,979.73 -1,559.84 -690.29 5,968,532.817 642,898.396 4.11 1,579.46 11,420.10 90.12 137.42 9,054.40 8,979.38 -1,582.13 -670.63 5,968,510.908 642,918.483 8.65 1,601.16 11,450.26 88.62 135.68 9,054.73 8,979.71 -1,604.03 -649.89 5,968,489.418 642,939.635 7.62 1,622.44 11,480.49 91.69 135.64 9,054.65 8,979.63 -1,625.64 -628.76 5,968,468.210 642,961.169 10.16 1,643.42 11,516.42 93.56 134.08 9,053.00 8,977.98 -1,650.96 -603.32 5,968,443.387 642,987.086 6.77 1,667.98 11,540.62 91.84 132.86 9,051.86 8,976.84 -1,667.59 -585.78 5,968,427.098 643,004.942 8.71 1,684.09 11,571.82 87.73 130.71 9,051.98 8,976.96 -1,688.37 -562.52 5,968,406.764 643,028.591 14.87 1,704.18 11,600.82 89.29 128.45 9,052.73 8,977.71 -1,706.84 -540.18 5,968,388.727 643,051.280 9.47 1,721.98 11,630.50 90.46 127.67 9,052.80 8,977.78 -1,725.14 -516.81 5,968,370.882 643,074.993 4.74 1,739.59 11,660.17 90.34 126.51 9,052.59 8,977.57 -1,743.03 -493.15 5,968,353.447 643,098.995 3.93 1,756.77 11,692.62 91.20 123.81 9,052.16 8,977.14 -1,761.71 -466.62 5,968,335.276 643,125.870 8.73 1,774.67 11,720.10 92.92 122.11 9,051.17 8,976.15 -1,776.65 -443.58 5,968,320.781 643,149.190 8.80 1,788.93 11,750.58 92.70 120.75 9,049.67 8,974.65 -1,792.53 -417.61 5,968,305.407 643,175.463 4.51 1,804.03 11,783.24 89.39 116.93 9,049.08 8,974.06 -1,808.27 -389.01 5,968,290.213 643,204.353 15.47 1,818.93 11,815.04 90.58 113.35 9,049.09 8,974.07 -1,821.78 -360.23 5,968,277.260 643,233.386 11.86 1,831.58 12111/2019 2: 35 59P Page 9 COMPASS 5000.15 Build 90 __b BP p Final Survey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU (°) Site: J (usft) Well: J-09 9,049.14 Wellbore: J -09C 108.75 Design: J -09C 8,973.96 Survey 9,047.94 MD Inc 104.63 (usft) (°) 8,971.50 11,840.74 89.20 11,871.25 91.38 11, 901.82 92.52 11, 930.31 93.20 11,960.77 92.46 11,992.10 92.09 12,020.71 91.04 12,050.83 90.92 12,080.96 90.86 12,136.00 90.86 Projection to TD (usft) Design Annotations (usft) Measured Vertical Depth Depth (usft) (usft) 10, 551.41 9,028.04 10,564.00 9,028.60 12,136.00 9,041.18 Azi TVD TVDSS (°) (usft) (usft) 110.28 9,049.14 8,974.12 108.75 9,048.98 8,973.96 106.49 9,047.94 8,972.92 104.63 9,046.52 8,971.50 101.47 9,045.02 8,970.00 100.46 9,043.77 8,968.75 105.24 9,042.99 8,967.97 109.64 9,042.47 8,967.45 115.24 9,042.01 8,966.99 115.24 9,041.18 8,966.16 Local Coordinates +N/ -S +E/ -W (usft) (usft) Comment -1,150.43 -1,400.25 Tie-in point -1,152.97 -1,387.93 KOP - Top of Billet -1,921.57 -56.51 Projection to TD 12/11/2019 2:35:59PM Page 10 COMPASS 5000.15 Build 90 Local Co-ordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A/ B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 N/S E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (°/100usft) (usft) -1,831.33 -336.37 5,968,268.170 643,257.419 13.10 1,840.43 -1,841.52 -307.62 5,968,258.531 643,286.360 8.73 1,849.77 -1,850.77 -278.50 5,968,249.843 643,315.646 8.28 1,858.16 -1,858.40 -251.09 5,968,242.737 643,343.195 6.94 1,864.98 -1,865.27 -221.46 5,968,236.437 643,372.952 10.64 1,870.97 -1,871.22 -190.73 5,968,231.072 643,403.792 3.43 1,876.02 -1,877.58 -162.85 5,968,225.248 643,431.781 17.10 1,881.56 -1,886.61 -134.13 5,968,216.777 643,460.670 14.61 1,889.73 -1,898.10 -106.29 5,968,205.817 643,488.717 18.58 1,900.41 -1,921.57 -56.51 5,968,183.308 643,538.932 0.00 1,922.40 12/11/2019 2:35:59PM Page 10 COMPASS 5000.15 Build 90 North America - ALASKA - BP PBU J-09 J-09CPB1 500292025171 Design: J-09CPB1 Final Survey Report 11 December, 2019 Baker Hughes BP p Final Survey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J-09CP131 Design: J-09CPB1 Local Co-ordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A / B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 ' OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site J, TR -11-13 Site Position: From: Map Position Uncertainty: 0.00 usft Well J-09, J-09 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore J -09C P B 1 Magnetics Model Name Sample Date BGGM2018 12/1/2019 Design J -09C P B 1 Audit Notes: Version: Vertical Section: Northing: 5,968,224.220 usft Easting: 641,155.790 usft Slot Radius: 0.000 in Northing: 5,970,105.460 usft Easting: 643,558.670 usft Wellhead Elevation: 41.22 usft Declination 16.53 Phase: ACTUAL Depth From (TVD) +N/ -S (usft) (usft) 33.80 0.00 Latitude: 70° 19' 14.845 N Longitude: 148° 51'20.092 W Grid Convergence: 1.08 ° Latitude: 70° 19'32.897 N Longitude: 148° 50'&927 W Ground Level: 41.16 usft Dip Angle Field Strength (°) (nT) 80.91 57, 404.00198567 Tie On Depth: 9,417.00 +E/ -W Direction (usft) (°) 0.00 239.71 12/11/2019 2:46:20PM Page 2 COMPASS 5000.15 Build 90 Survey MD BP Azi TVD TVDSS N/S E/W Northing Easting Baker p Final Survey Report (°) Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 (usft) Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) (usft) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) 33.80 Well: J-09 North Reference: True 5,970,105.460 Wellbore: J-09CPB1 Survey Calculation Method: Minimum Curvature 101.05 Design: J-09CP61 Database: EDM R5K - Alaska PROD - ANCP1 26.03 Survey Program Date 12/9/2019 0.01 5,970,105.433 643,558.682 From To 0.00 201.05 0.17 (usft) (usft) Survey (Wellbore) Tool Name Description 126.03 -0.21 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 643,558.680 0.13 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 0.25 193.73 9,455.00 10,172.00 Survey #1 (J-09CPB1) MWD MWD - Standard -0.57 -0.07 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 33.80 0.00 0.00 33.80 -41.22 0.00 0.00 5,970,105.460 643,558.670 0.00 0.00 101.05 0.05 157.63 101.05 26.03 -0.03 0.01 5,970,105.433 643,558.682 0.07 0.00 201.05 0.17 188.54 201.05 126.03 -0.21 0.01 5,970,105.246 643,558.680 0.13 0.10 301.05 0.25 193.73 301.05 226.03 -0.57 -0.07 5,970,104.886 643,558.613 0.08 0.35 401.05 0.27 193.00 401.05 326.03 -1.01 -0.17 5,970,104.443 643,558.517 0.02 0.66 501.05 0.32 198.90 501.05 426.03 -1.51 -0.32 5,970,103.946 643,558.383 0.06 1.03 601.05 0.33 201.61 601.05 526.03 -2.04 -0.51 5,970,103.411 643,558.196 0.02 1.47 701.05 0.42 177.51 701.04 626.02 -2.67 -0.60 5,970,102.775 643,558.118 0.18 1.87 801.05 0.42 173.29 801.04 726.02 -3.40 -0.54 5,970,102.046 643,558.191 0.03 2.19 901.05 0.47 166.22 901.04 826.02 -4.17 -0.40 5,970,101.287 643,558.346 0.07 2.45 1,001.05 0.25 169.31 1,001.04 926.02 -4.78 -0.27 5,970,100.677 643,558.496 0.22 2.64 1,101.05 0.07 163.95 1,101.03 1,026.01 -5.05 -0.21 5,970,100.405 643,558.559 0.18 2.73 1,201.05 0.25 33.06 1,201.03 1,126.01 -4.93 -0.07 5,970,100.532 643,558.692 0.30 2.55 1,301.05 0.25 7.08 1,301.03 1,226.01 -4.53 0.07 5,970,100.934 643,558.830 0.11 2.22 1,401.05 0.08 340.59 1,401.03 1,326.01 -4.25 0.08 5,970,101.216 643,558.829 0.18 2.07 1,501.05 0.35 358.68 1,501.03 1,426.01 -3.88 0.05 5,970,101.587 643,558.791 0.28 1.91 1,601.05 0.33 346.80 1,601.03 1,526.01 -3.29 -0.03 5,970,102.171 643,558.707 0.07 1.68 1,701.05 0.17 323.00 1,701.03 1,626.01 -2.89 -0.18 5,970,102.567 643,558.545 0.19 1.61 1,801.05 0.23 98.93 1,801.03 1,726.01 -2.80 -0.07 5,970,102.656 643,558.652 0.37 1.48 1,901.05 0.23 142.79 1,901.03 1,826.01 -2.99 0.25 5,970,102.471 643,558.975 0.17 1.30 12/11/2019 2.46:20PM Page 3 COMPASS 5000.15 Build 90 bBP p Final Survey Report Baker - Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CPB1 Survey Calculation Method: Minimum Curvature Design: J-09CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS NIS EM Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,001.05 0.18 147.00 2,001.03 1,926.01 -3.29 0.45 5,970,102.184 643,559.188 005 1.26 2,101.05 0.67 151.20 2,101.03 2,026.01 -3.93 0.82 5,970,101.547 643,559.567 0.49 1.271 2,201.05 0.42 163.94 2,201.02 2,126.00 -4.79 1.21 5,970,100.690 643,559.967 0.28 1.381 2,301.05 0.30 164.10 2,301.02 2,226.00 -5.40 1.38 5,970,100.089 643,560.151 0.12 1.53 2,401.05 0.62 171.77 2,401.02 2,326.00 -6.19 1.53 5,970,099.305 643,560.315 0.33 1.80 2,501.05 0.63 174.53 2,501.01 2,425.99 -7.27 1.66 5,970,098.225 643,560.466 0.03 2.2311 2,601.05 0.32 156.49 2,601.01 2,525.99 -8.07 1.82 5,970,097.425 643,560.645 0.34 2.501 2,701.05 0.50 140.10 2,701.00 2,625.98 -8.66 2.21 5,970,096.842 643,561.047 021 2.461, 2,801.05 0.50 128.94 2,801.00 2,725.98 -9.27 2.83 5,970,096.245 643,561.678 0.10 2.231 2,901.05 1.08 138.80 2,900.99 2,825.97 -10.26 3.79 5,970,095.280 643,562.657 0.59 1.901 3,001.05 1.77 166.27 3,000.96 2,925.94 -12.46 4.78 5,970,093.090 643,563.686 0.95 2.16 3,101.05 5.33 195.17 3,100.76 3,025.74 -18.45 3.93 5,970,087.090 643,562.952 3.88 5.91 3,201.05 6.83 212.68 3,200.20 3,125.18 -27.94 -0.50 5,970,077.519 643,558.708 2.37 14.521 3,301.05 8.15 219.30 3,299.35 3,224.33 -38.43 -8.20 5,970,066.884 643,551.210 1.57 26.46 3,401.05 10.15 222.24 3,398.07 3,323.05 -50.44 -18.61 5,970,054.678 643,541.028 2.05 41.51 3,501.05 12.83 224.93 3,496.06 3,421.04 -64.83 -32.38 5,970,040.032 643,527.540 2.73 60.6E 3,601.05 15 88 226.70 3,592.92 3,517.90 -82.07 -50.18 5,970,022.448 643,510.072 3.08 84.72 3,701.05 18.43 226.34 3,688.47 3,613.45 -102.37 -71.58 5,970,001.745 643,489.070 2.55 113.44 3,801.05 21.75 226.51 3,782.37 3,707.35 -126.04 -96.46 5,969,977.604 643,464.645 3.32 146.86 3,901.05 24.33 227.38 3,874.39 3,799.37 -152.75 -125.07 5,969,950.359 643,436.558 2.60 185.03 4,001.05 27.37 226.55 3,964.37 3,889.35 -182.51 -156.92 5,969,919.993 643,405.282 3.06 227.551 4,101.05 30.00 227.72 4,052.09 3,977.07 -215.15 -192.11 5,969,886.695 643,370.724 2.69 274.40 4,201.05 31.08 228.37 4,138.22 4,063.20 -249.11 -229.90 5,969,852.014 643,333.593 1.13 324.16 4,301.05 31.00 228.43 4,223.90 4,148.88 -283.35 -268.46 5,969,817.050 643,295.699 0.09 374.72 4,401.05 30.80 227.83 4,309.70 4,234.68 -317.62 -306.70 5,969,782.053 643,258.123 0.37 425.03 4,501.05 31.05 228.09 4,395.49 4,320.47 -352.04 -344.87 5,969,746.918 643,220.623 0.28 475.34 4,601.05 31.27 228.64 4,481.06 4,406.04 -386.41 -383.54 5,969,711.810 643,182.619 0.36 526.08 12/11/2019 2:46:20PM Page 4 COMPASS 5000.15 Build 90 Survey MD BP Azi ND TVDSS bp E/W Northing Easting Baker s V. Sec Final Survey Report (°) Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 (usft) Project: PBU ND Reference: KB @ 75.02usft (J -09A / B OKB) (usft) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) 4,566.33 Well: J-09 North Reference: True 5,969,676.477 Wellbore: J-09CPB1 Survey Calculation Method: Minimum Curvature 4,801.05 Design: J-09CPB1 Database: EDM R5K - Alaska PROD - ANCP1 4,576.14 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,701.05 31.72 228.43 4,566.33 4,491.31 -421.01 -422.69 5,969,676.477 643,144.143 0.46 577.33 4,801.05 32.22 228.98 4,651.16 4,576.14 -455.95 -462.47 5,969,640.785 643,105.040 0.58 629.30 4,901.05 32.50 229.23 4,735.63 4,660.61 -490.99 -502.93 5,969,604.980 643,065.262 0.31 681.91 5,001.05 32.73 229.79 4,819.86 4,744.84 -525.98 -543.92 5,969,569.208 643,024.951 0.38 734.96 5,101.05 32.68 230.28 4,904.01 4,828.99 -560.69 -585.33 5,969,533.720 642,984.214 0.27 788.22 5,201.05 32.83 230.72 4,988.11 4,913.09 -595.10 -627.08 5,969,498.516 642,943.135 0.28 841.62 5,301.05 32.87 231.35 5,072.12 4,997.10 -629.21 -669.26 5,969,463.607 642,901.622 0.34 895.25 5,401.05 32.65 231.48 5,156.21 5,081.19 -662.96 -711.56 5,969,429.058 642,859.980 0.23 948.79 5,501.05 32.60 230.84 5,240.43 5,165.41 -696.77 -753.55 5,969,394.452 642,818.645 0.35 1,002.11 5,601.05 32.65 230.93 5,324.66 5,249.64 -730.79 -795.38 5,969,359.648 642,777.476 0.07 1,055.38 5,701.05 32.17 232.11 5,409.08 5,334.06 -764.14 -837.33 5,969,325.502 642,736.171 0.79 1,108.43 5,801.05 32.18 231.97 5,493.72 5,418.70 -796.89 -879.32 5,969,291.952 642,694.824 0.08 1,161.20 5,901.05 31.65 231.91 5,578.61 5,503.59 -829.48 -920.94 5,969,258.573 642,653.833 0.53 1,213.58 6,001.05 31.25 231.56 5,663.91 5,588.89 -861.79 -961.91 5,969,225.487 642,613.496 0.44 1,265.25 6,101.05 30.75 231.65 5,749.63 5,674.61 -893.78 -1,002.28 5,969,192.735 642,573.753 0.50 1,316.24 6,206.80 25.82 219.10 5,842.81 5,767.79 -928.48 -1,038.06 5,969,157.361 642,538.646 7.28 1,364.64 6,300.13 23.75 224.40 5,927.55 5,852.53 -957.69 -1,064.03 5,969,127.664 642,513.238 3.25 1,401.80 6,393.83 22.73 220.20 6,013.65 5,938.63 -985.00 -1,088.92 5,969,099.885 642,488.878 2.08 1,437.06 6,479.80 22.53 219.20 6,093.00 6,017.98 -1,010.45 -1,110.05 5,969,074.038 642,468.241 0.50 1,468.14 6,573.43 22.43 221.60 6,179.52 6,104.50 -1,037.71 -1,133.25 5,969,046.342 642,445.571 0.99 1,501.92 6,666.54 22.12 220.60 6,265.68 6,190.66 -1,064.30 -1,156.45 5,969,019.311 642,422.884 0.53 1,535.37 6,760.76 21.72 221.50 6,353.09 6,278.07 -1,090.83 -1,179.54 5,968,992.350 642,400.301 0.55 1,568.69 6,855.36 21.35 221.40 6,441.09 6,366.07 -1,116.86 -1,202.53 5,968,965.890 642,377.818 0.39 1,601.67 6,946.09 22.30 221.60 6,525.31 6,450.29 -1,142.12 -1,224.88 5,968,940.207 642,355.956 1.05 1,633.71 7,040.51 22.69 221.60 6,612.55 6,537.53 -1,169.13 -1,248.87 5,968,912.741 642,332.494 0.41 1,668.04 7,142.84 21.63 222.60 6,707.32 6,632.30 -1,197.77 -1,274.74 5,968,883.610 642,307.178 1.10 1,704.83 7,236.75 22.47 223.60 6,794.36 6,719.34 -1,223.51 -1,298.83 5,968,857.419 642,283.585 0.98 1,738.61 12/11/2019 2.46.20PM Page 5 COMPASS 5000.15 Build 90 ?• 40, h BP 4_ bp Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CP61 Survey Calculation Method: Minimum Curvature Design: J-09CP61 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,330.51 21.61 219.50 6,881.27 6,806.25 -1,249.81 -1,322.17 5,968,830.679 642,260.754 1.88 1,772.03 7,423.71 20.25 221.90 6,968.32 6,893.30 -1,275.06 -1,343.86 5,968,805.022 642,239.553 1.72 1,803.49 7,509.74 21.40 224.30 7,048.73 6,973.71 -1,297.38 -1,364.76 5,968,762.312 642,219.080 1.66 1,832.80 7,604.62 21.22 227.10 7,137.13 7,062.11 -1,321.45 -1,389.43 5,968,757.769 642,194.878 1.09 1,866.25 7,695.33 21.98 223.70 7,221.47 7,146.45 -1,344.90 -1,413.19 5,968,733.871 642,171.578 1.61 1,898.58 7,797.54 22.89 215.10 7,315.97 7,240.95 -1,375.00 -1,437.84 5,968,703.307 642,147.508 3.33 1,935.0511 7,890.36 22.56 216.20 7,401.58 7,326.56 -1,404.14 -1,458.74 5,968,673.777 642,127.175 0.58 1,967.791, 7,977.39 22.15 218.10 7,482.07 7,407.05 -1,430.52 -1,478.72 5,968,647.018 642,107.701 0.95 1,998.35 8,070.65 21.82 227.40 7,568.58 7,493.56 -1,456.10 -1,502.33 5,968,620.999 642,084.583 3.75 2,031.64 I 8,172.84 21.70 229.50 7,663.49 7,588.47 -1,481.22 -1,530.68 5,968,595.338 642,056.725 0.77 2,068.79 8,267.31 21.69 242.90 7,751.32 7,676.30 -1,500.53 -1,559.52 5,968,575.484 642,028.263 5.23 2,103.43 8,360.20 21.21 254.00 7,837.81 7,762.79 -1,512.99 -1,590.96 5,968,562.429 641,997.063 4.39 2,136.87 8,453.79 20.82 271.50 7,925.26 7,850.24 -1,517.22 -1,623.90 5,968,557.565 641,964.219 6.70 2,167.44 8,547.79 23.28 275.30 8,012.38 7,937.36 -1,515.07 -1,659.10 5,968,559.045 641,928.984 3.02 2,196.75 8,630.66 23.58 276.80 8,088.42 8,013.40 -1,511.59 -1,691.87 5,968,561.892 641,896.161 0.81 2,223.29 8,725.82 24.28 280.20 8,175.41 8,100.39 -1,505.87 -1,730.02 5,968,566.879 641,857.904 1.62 2,253.3E 8,819.57 26.98 292.50 8,259.98 8,184.96 -1,494.31 -1,768.68 5,968,577.699 641,819.041 6.35 2,260.90 8,922.39 30.27 299.80 8,350.25 8,275.23 -1,472.50 -1,812.74 5,968,598.667 641,774.573 4.66 2,307.95 9,005.62 34.43 303.00 8,420.56 8,345.54 -1,449.24 -1,850.69 5,968,621.187 641,736.182 5.40 2,329.00 9,100.29 36.67 305.60 8,497.58 8,422.56 -1,418.21 -1,896.13 5,968,651.348 641,690.161 2.85 2,352.58 9,201.95 37.30 305.80 8,578.78 8,503.76 -1,382.52 -1,945.80 5,968,686.078 641,639.825 0.63 2,377.47 9,294.74 38.07 307.30 8,652.22 8,577.20 -1,348.73 -1,991.36 5,968,718.981 641,593.629 1.29 2,399.77 9,386.89 38.09 307.50 8,724.75 8,649.73 -1,314.21 -2,036.51 5,968,752.628 641,547.831 0.14 2,421.35 9,417.00 3800 304.00 8,748.47 8,673.45 -1,303.38 -2,051.56 5,968,763.175 641,532.573 7.17 2,428.88 Tie-in point 9,455.00 38.94 305.49 8,778.22 8,703.20 -1,289.90 -2,070.99 5,968,776.275 641,512.899 3.47 2,438.86 KOP 12111/2019 2: 46 20P Page 6 COMPASS 5000.15 Build 90 �� BP Final Survey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J-09CPB1 Design: J-09CP131 Survey 8,775.77 MD Inc (usft) (°) 9479.75 35.74 Interpolated Azimuth 9,513.84 Interpolated Azimuth 9,540.29 Interpolated Azimuth 9,570.29 First Clean Survey 9,600.58 9,632.44 9,660.93 9,690.51 9,720.63 9,752.14 9,781.21 9,815.91 9,841.05 9,870.65 9,902.33 9,931.68 9,960.24 9,980.35 10,010.40 10,040.27 10, 070.67 10,100.25 10,130.16 Local Co-ordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A / B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 311.36 8,797.90 8,722.88 -1,280.60 -2,082.75 5,968,785.345 641,500.959 19.33 2,444.33 26.58 320.64 8,827.06 8,752.04 -1,268.09 -2,095.09 5,968,797.615 641,488.380 30.27 2,448.67 25.95 328.83 8,850.79 8,775.77 -1,258.56 -2,101.84 5,968,807.013 641,481.449 13.90 2,449.70 29.97 339.04 8,877.29 8,802.27 -1,245.94 -2,107.93 5,968,819.520 641,475.125 20.80 2,448.58 31.53 355.76 8,903.37 8,828.35 -1,230.95 -2,111.23 5,968,834.445 641,471.541 28.61 2,443.87 34.77 7.65 8,930.07 8,855.05 -1,213.61 -2,110.63 5,968,851.786 641,471.803 22.76 2,434.61 39.15 19.82 8,952.86 8,877.84 -1,197.07 -2,106.49 5,968,868.404 641,475.624 29.87 2,422.70 43.35 30.18 8,975.12 8,900.10 -1,179.48 -2,098.21 5,968,886.147 641,483.569 27.07 2,406.67 48.93 36.45 8,996.00 8,920.98 -1,161.39 -2,086.25 5,968,904.464 641,495.178 23.83 2,387.22 56.05 40.13 9,015.17 8,940.15 -1,141.81 -2,070.75 5,968,924.332 641,510.303 24.41 2,363.96 64.85 41.81 9,029.50 8,954.48 -1,122.75 -2,054.17 5,968,943.708 641,526.510 30.68 2,340.03 75.16 43.73 9,041.35 8,966.33 -1,098.85 -2,032.05 5,968,968.017 641,548.172 30.16 2,308.88 83.64 46.29 9,045.97 8,970.95 -1,081.41 -2,014.58 5,968,985.794 641,565.298 35.18 2,285.0G 91.38 50.03 9,047.25 8,972.23 -1,061.70 -1,992.57 5,969,005.915 641,586.928 29.03 2,256.05 93.77 57.04 9,045.83 8,970.81 -1,042.90 -1,967.14 5,969,025.195 641,611.995 23.36 2,224.61 93.44 64.82 9,043.98 8,968.96 -1,028.68 -1,941.55 5,969,039.901 641,637.299 26.48 2,195.35 93.63 71.84 9,042.22 8,967.20 -1,018.16 -1,915.08 5,969,050.924 641,663.565 24.54 2,167.18 93.63 77.88 9,040.94 8,965.92 -1,012.92 -1,895.72 5,969,056.533 641,682.824 29.97 2,147.82 95.26 81.27 9,038.61 8,963.59 -1,007.50 -1,866.26 5,969,062.516 641,712.172 12.49 2,119.65 92.49 84.17 9,036.60 8,961.58 -1,003.73 -1,836.70 5,969,066.855 641,741.647 13.41 2,092.22 90.03 85.82 9,035.93 8,960.91 -1,001.08 -1,806.43 5,969,070.085 641,771.862 9.74 2,064.74 87.23 86.23 9,036.63 8,961.61 -999.03 -1,776.93 5,969,072.698 641,801.313 9.57 2,038.24 87.30 87.96 9,038.06 8,963.04 -997.51 -1,747.09 5,969,074.783 641,831.112 5.78 2,011.71 12/11/2019 2:46:20PM Page 7 COMPASS 5000.15 Build 90 ObnalBP p FiSurvey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU +N/ -S Site: J Well: J-09 (usft) Wellbore: J-09CPB1 -1,303.38 Design: J-09CPB1 Tie-in point Survey -2,070.99 MD Inc -1,280.60 (usft) (°) InterpolatedAzimuth 10,172.00 87.30 Projection to TD -1,258.56 Design Annotations Interpolated Azimuth Measured Vertical Depth Depth (usft) (usft) 9,417.00 8,748.47 9,455.00 8,778.22 9,479.75 8,797.90 9,513.84 8,827.06 9,540.29 8,850.79 9,570.29 8,877.29 10,172.00 9,040.03 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well J-09 KB @ 75.02usft (J -09A / B OKB) KB @ 75.02usft (J -09A/ B OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS E/W Northing Easting DLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 87.96 9,040.03 8,965.01 -996.03 -1,705.33 5,969,077.069 641,872.840 0.00 Local Coordinates +N/ -S +E/ -W (usft) (usft) Comment -1,303.38 -2,051.56 Tie-in point -1,289.90 -2,070.99 KOP -1,280.60 -2,082.75 InterpolatedAzimuth -1,268.09 -2,095.09 InterpolatedAzimuth -1,258.56 -2,101.84 Interpolated Azimuth -1,245.94 -2,107.93 First Clean Survey -996.03 -1,705.33 Projection to TD V. Sec (usft) 1,974.89 12/11/2019 2:46:20PM Page 8 COMPASS 5000.15 Build 90 North America - ALASKA - BP PBU J J-09 J-09CPB2 Design: J-09CPB2 Final Survey Report 11 December, 2019 Baker Hughes p Final SuBP rvey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J-09CPB2 Design: J-09CPB2 Local Coordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A / B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-UsaAK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site J, TR -11-13 Site Position: From: Map Position Uncertainty: 0.00 usft Well J-09, J-09 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore J -09C PB2 Magnetics Model Name Sample Date BGGM2018 12/1/2019 Design J -09C P B2 Audit Notes: Version: 1.0 Vertical Section: Northing: Easting: Slot Radius: Northing: Easting: Wellhead Elevation: Declination 1°) 16.53 Phase: ACTUAL Depth From (TVD) +N/ -S (usft) (usft) 33.80 0.00 5,968,224.220 usft 641,155.790 usft 0.000 in 5,970,105.460 usft 643,558.670 usft 41.22 usft Dip Angle 80.91 Tie On Depth +E/ -W (usft) 0.00 Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: Field Strength (nT) 57,403.99344046 9,632.44 Direction 192.26 70° 19' 14.845 N 148° 51'20.092 W 1.08 ° 70° 19' 32.897 N 148° 50'8.927 W 41.16 usft 12111/2019 2: 50 26P Page 2 COMPASS 5000.15 Build 90 BP by Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CP62 Survey Calculation Method: Minimum Curvature Design: J-09CP82 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 12/9/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 9,455.00 9,632.44 Survey #1 (J-09CPB1) MWD MWD - Standard 9,650.00 11,747.00 Survey #1 (J-09CP62) MWD MWD - Standard Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 33.80 0.00 0.00 33.80 -41.22 0.00 0.00 5,970,105.460 643,558.670 0.00 0.00 101.05 0.05 157.63 101.05 26.03 -0.03 0.01 5,970,105.433 643,558.682 0.07 0.02 201.05 0.17 188.54 201.05 126.03 -0.21 0.01 5,970,105.246 643,558.680 0.13 0.21 301.05 0.25 193.73 301.05 226.03 -0.57 -0.07 5,970,104.886 643,558.613 0.08 0.57 401.05 0.27 193.00 401.05 326.03 -1.01 -0.17 5,970,104.443 643,558.517 0.02 1.03 501.05 0.32 198.90 501.05 426.03 -1.51 -0.32 5,970,103.946 643,558.383 0.06 1.54 601.05 0.33 201.61 601.05 526.03 -2.04 -0.51 5,970,103.411 643,558.196 0.02 2.10 701.05 0.42 177.51 701.04 626.02 -2.67 -0.60 5,970,102.775 643,558.118 0.18 2.74 801.05 0.42 173.29 801.04 726.02 -3.40 -0.54 5,970,102.046 643,558.191 0.03 3.44 901.05 0.47 166.22 901.04 826.02 -4.17 -0.40 5,970,101.287 643,558.346 0.07 4.16 1,001.05 0.25 169.31 1,001.04 926.02 -4.78 -0.27 5,970,100.677 643,558.496 0.22 4.73 1,101.05 0.07 163.95 1,101.03 1,026.01 -5.05 -0.21 5,970,100.405 643, 558.559 0.18 4.98 1,201.05 0.25 33.06 1,201.03 1,126.01 -4.93 -0.07 5,970,100.532 643,558.692 0.30 4.83 1,301.05 0.25 7.08 1,301.03 1,226.01 -4.53 0.07 5,970,100.934 643,558.830 0.11 4.41 1,401.05 0.08 340.59 1,401.03 1,326.01 -4.25 0.08 5,970,101.216 643,558.829 0.18 4.13 1,501.05 0.35 358.68 1,501.03 1,426.01 -3.88 0.05 5,970,101.587 643,558.791 0.28 3.78 1,601.05 0.33 346.80 1,601.03 1,526.01 -3.29 -0.03 5,970,102.171 643,558.707 0.07 3.22 1,701.05 0.17 323.00 1,701.03 1,626.01 -2.89 -0.18 5,970,102.567 643,558.545 0.19 2.86 1,801.05 0.23 98.93 1,801.03 1,726.01 -2.80 -0.07 5,970,102.656 643,558.652 0.37 2.75 1,901.05 0.23 142.79 1,901.03 1,826.01 -2.99 0.25 5,970,102.471 643,558.975 0.17 2.87 12/11/2019 2: 50 26P Page 3 COMPASS 5000.15 Build 90 bp BP Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU ND Reference: KB @ 75.02usft (J -09A / B 0KB) Site: J MD Reference: KB @ 75.02usft (J -09A / B 0KB) Well: J-09 North Reference: True Wellbore: J-09CPB2 Survey Calculation Method: Minimum Curvature Design: J-09CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 2,001.05 0.18 147.00 2,001.03 1,926.01 -3.29 0.45 5,970,102.184 643,559.188 0.05 3.11 2,101.05 0.67 151.20 2,101.03 2,026.01 -3.93 0.82 5,970,101.547 643,559.567 0.49 3.67 2,201.05 0.42 163.94 2,201.02 2,126.00 -4.79 1.21 5,970,100.690 643,559.967 0.28 4.43 2,301.05 0.30 164.10 2,301.02 2,226.00 -5.40 1.38 5,970,100.089 643,560.151 0.12 4.98 2,401.05 0.62 171.77 2,401.02 2,326.00 -6.19 1.53 5,970,099.305 643,560.315 0.33 5.72 2,501.05 0.63 174.53 2,501.01 2,425.99 -7.27 1.66 5,970,098.225 643,560.466 0.03 6.75 2,601.05 0.32 156.49 2,601.01 2,525.99 -8.07 1.82 5,970,097.425 643,560.645 0.34 7.50 2,701.05 0.50 140.10 2,701.00 2,625.98 -8.66 2.21 5,970,096.842 643,561.047 0.21 8.00 2,801.05 0.50 128.94 2,801.00 2,725.98 -9.27 2.83 5,970,096.245 643,561.678 0.10 8.46 2,901.05 1.08 138.80 2,900.99 2,825.97 -10.26 3.79 5,970,095.280 643,562.657 0.59 9.22 3,001.05 1.77 166.27 3,000.96 2,925.94 -12.46 4.78 5,970,093.090 643,563.686 0.95 11.17 3,101.05 5.33 195.17 3,100.76 3,025.74 -18.45 3.93 5,970,087.090 643,562.952 3.88 17.19 3,201.05 6.83 212.68 3,200.20 3,125.18 -27.94 -0.50 5,970,077.519 643,556.708 2.37 27.41 3,301.05 8.15 219.30 3,299.35 3,224.33 -38.43 -8.20 5,970,066.884 643,551.210 1.57 39.29 3,401.05 10.15 222.24 3,398.07 3,323.05 -50.44 -18.61 5,970,054.678 643,541.028 2.05 53.24 3,501.05 12.83 224.93 3,496.06 3,421.04 -64.83 -32.38 5,970,040.032 643,527.540 2.73 70.22 3,601.05 15.88 226.70 3,592.92 3,517.90 -82.07 -50.18 5,970,022.448 643,510.072 3.08 90.86 3,701.05 18.43 226.34 3,688.47 3,613.45 -102.37 -71.58 5,970,001.745 643,489.070 2.55 115.24 3,801.05 21.75 226.51 3,782.37 3,707.35 -126.04 -96.46 5,969,977.604 643,464.645 3.32 143.65 3,901.05 24.33 227.38 3,874.39 3,799.37 -152.75 -125.07 5,969,950.359 643,436.558 2.60 175.82 4,001.05 27.37 226.55 3,964.37 3,889.35 -182.51 -156.92 5,969,919.993 643,405.282 3.06 211.67 4,101.05 30.00 227.72 4,052.09 3,977.07 -215.15 -192.11 5,969,886.695 643,370.724 2.69 251.04 4,201.05 31.08 228.37 4,138.22 4,063.20 -249.11 -229.90 5,969,852.014 643,333.593 1.13 292.25 4,301.05 31.00 228.43 4,223.90 4,148.88 -283.35 -268.46 5,969,817.050 643,295.699 0.09 333.90 4,401.05 30.80 227.83 4,309.70 4,234.68 -317.62 -306.70 5,969,782.053 643,258.123 0.37 375.51 4,501.05 31.05 228.09 4,395.49 4,320.47 -352.04 -344.87 5,969,746.918 643,220.623 0.28 417.24 4,601.05 31.27 228.64 4,481.06 4,406.04 -386.41 -383.54 5,969,711.810 643,182.619 0.36 459.05 12/11/2019 2:50:26PM Page 4 COMPASS 5000.15 Build 90 wool BP byFinal Survey Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CPB2 Survey Calculation Method: Minimum Curvature Design: J-09CPB2 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,701.05 31.72 228.43 4,566.33 4,491.31 -421.01 -422.69 5,969,676.477 643,144.143 046 501.17 4,801.05 32.22 228.98 4,651.16 4,576.14 -455.95 -462.47 5,969,640.785 643,105.040 0.58 543.76 4,901.05 32.50 229.23 4,735.63 4,660.61 -490.99 -502.93 5,969,604.980 643,065.262 0.31 586.591 5,001.05 32.73 229.79 4,819.86 4,744.84 -525.98 -543.92 5,969,569.208 643,024.951 0.38 629.49 5,101.05 32.68 230.28 4,904.01 4,828.99 -560.69 -585.33 5,969,533.720 642,984.214 0.27 672.201 5,201.05 32.83 230.72 4,988.11 4,913.09 -595.10 -627.08 5,969,498.516 642,943.135 0.28 714.70 5,301.05 32.87 231.35 5,072.12 4,997.10 -629.21 -669.26 5,969,463.607 642,901.622 0 34 756.99 5,401.05 32.65 231.48 5,156.21 5,081.19 -662.96 -711.56 5,969,429.058 642,859.980 0.23 798.95 5,501.05 32.60 230.84 5,240.43 5,165.41 -696.77 -753.55 5,969,394.452 642,818.645 0.35 840.91 5,601.05 32.65 230.93 5,324.66 5,249.64 -730.79 -795.38 5,969,359.648 642,777.476 0.07 883.03 5,701.05 32.17 232.11 5,409.08 5,334.06 -764.14 -837.33 5,969,325.502 642,736.171 0.79 924.53 5,801.05 32.18 231.97 5,493.72 5,418.70 -796.89 -879.32 5,969,291.952 642,694.824 0.08 965.45 5,901.05 31.65 231.91 5,578.61 5,503.59 -829.48 -920.94 5,969,258.573 642,653.833 0.53 1,006.14 6,001.05 31.25 231.56 5,663.91 5,588.89 -861.79 -961.91 5,969,225.487 642,613.496 0.44 1,046.41 6,101.05 30.75 231.65 5,749.63 5,674.61 -893.78 -1,00228 5,969,192.735 642,573.753 0.50 1,086.24 6,206.80 25.82 219.10 5,842.81 5,767.79 -928.48 -1,038.06 5,969,157.361 642,538.646 7,28 1,127.7F 6,300.13 23.75 224.40 5,927.55 5,852.53 -957.69 -1,064.03 5,969,127.664 642,513.238 3.25 1,161.81 6,393.83 22.73 220.20 6,013.65 5,938.63 -985.00 -1,088.92 5,969,099.885 642,488.878 2.08 1,193.78 6,479.80 22.53 219.20 6,093.00 6,017.98 -1,010.45 -1,110.05 5,969,074.038 642,468.241 0.50 1,223.14 6,573.43 22.43 221.60 6,179.52 6,104.50 -1,037.71 -1,133.25 5,969,046.342 642,445.571 0.99 1,254.70 6,666.54 22.12 220.60 6,265.68 6,190.66 -1,064.30 -1,156.45 5,969,019.311 642,422.884 0.53 1,285.61 6,760.76 21.72 221.50 6,353.09 6,278.07 -1,090.83 -1,179.54 5,968,992.350 642,400.301 0.55 1,316.44 6,855.36 21.35 221.40 6,441.09 6,366.07 -1,116.86 -1,202.53 5,968,965.890 642,377.818 0.39 1,346.75 6,946.09 22.30 221.60 6,525.31 6,450.29 -1,142.12 -1,224.88 5,968,940.207 642,355.956 1.05 1,376.19 7,040.51 22.69 22160 6,612.55 6,537.53 -1,169.13 -1,248.87 5,968,912.741 642,332.494 0.41 1,407.68 7,142.84 21.63 222.60 6,707.32 6,632.30 -1,197.77 -1,274.74 5,968,883.610 642,307.178 1.10 1,441.16 7,236.75 22.47 223.60 6,794.36 6,719.34 -1,223.51 -1,298.83 5,968,857.419 642,283.585 0.98 1,471.43 12/11/2019 2:50:26PM Page 5 COMPASS 5000.15 Build 90 by Survey Report BP Final SuryBaker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CP62 Survey Calculation Method: Minimum Curvature Design: J-09CP132 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,330.51 21.61 219.50 6,881.27 6,806.25 -1,249.81 -1,322.17 5,968,830.679 642,260.754 1.88 1,502.08 7,423.71 20.25 221.90 6,968.32 6,893.30 -1,275.06 -1,343.86 5,968,805.022 642,239.553 1.72 1,531.36 7,509.74 21.40 224.30 7,048.73 6,973.71 -1,297.38 -1,364.76 5,968,782.312 642,219.080 1.66 1,557.61 7,604.62 21.22 227.10 7,137.13 7,062.11 -1,321.45 -1,389.43 5,968,757.769 642,194.878 1.09 1,586.38 7,695.33 21.98 223.70 7,221.47 7,146.45 -1,344.90 -1,413.19 5,968,733.871 642,171.578 1.61 1,614.34 7,797.54 22.89 215.10 7,315.97 7,240.95 -1,375.00 -1,437.84 5,968,703.307 642,147.508 3.33 1,648.99 7,890.36 22.56 216.20 7,401.58 7,326.56 -1,404.14 -1,458.74 5,968,673.777 642,127.175 0.58 1,681.90 7,977.39 22.15 218.10 7,482.07 7,407.05 -1,430.52 -1,478.72 5,968,647.018 642,107.701 0.95 1,711.92 8,070.65 21.82 227.40 7,568.58 7,493.56 -1,456.10 -1,502.33 5,968,620.999 642,084.583 3.75 1,741.93 8,172.84 21.70 229.50 7,663.49 7,588.47 -1,481.22 -1,530.68 5,968,595.338 642,056.725 0.77 1,772.50 8,267.31 21.69 242.90 7,751.32 7,676.30 -1,500.53 -1,559.52 5,968,575.484 642,028.263 5.23 1,797.49 8,360.20 21.21 254.00 7,837.81 7,762.79 -1,512.99 -1,590.96 5,968,562.429 641,997.063 4.39 1,816.34 8,453.79 20.82 271.50 7,925.26 7,850.24 -1,517.22 -1,623.90 5,968,557.565 641,964.219 6.70 1,827.47 8,547.79 23.28 275.30 8,012.38 7,937.36 -1,515.07 -1,659.10 5,968,559.045 641,928.984 3.02 1,832.84 8,630.66 23.58 276.80 8,088.42 8,013.40 -1,511.59 -1,691.87 5,968,561.892 641,896.161 0.81 1,836.41 8,725.82 24.28 280.20 8,175.41 8,100.39 -1,505.87 -1,730.02 5,968,566.879 641,857.904 1.62 1,838.92 8,819.57 26.98 292.50 8,259.98 8,184.96 -1,494.31 -1,768.68 5,968,577.699 641,819.041 6.35 1,835.83 8,922.39 30.27 299.80 8,350.25 8,275.23 -1,472.50 -1,812.74 5,968,598.667 641,774.573 4.66 1,823.87 9,005.62 34.43 303.00 8,420.56 8,345.54 -1,449.24 -1,850.69 5,968,621.187 641,736.182 5.40 1,809.21 9,100.29 36.67 305.60 8,497.58 8,422.56 -1,418.21 -1,896.13 5,968,651.348 641,690.161 2.85 1,788.53 9,201.95 37.30 305.80 8,578.78 8,503.76 -1,382.52 -1,945.80 5,968,686.078 641,639.825 0.63 1,764.20 9,294.74 38.07 307.30 8,652.22 8,577.20 -1,348.73 -1,991.36 5,968,718.981 641,593.629 1.29 1,740.86 9,386.89 38.09 307.50 8,724.75 8,649.73 -1,314.21 -2,036.51 5,968,752.628 641,547.831 0.14 1,716.72 9,417.00 38.00 304.00 8,748.47 8,673.45 -1,303.38 -2,051.56 5,968,763.175 641,532.573 7.17 1,709.32 9,455.00 38.94 305.49 8,778.22 8,703.20 -1,289.90 -2,070.99 5,968,776.275 641,512.899 3.47 1,700.28 9,479.75 35.74 311.36 8,797.90 8,722.88 -1,280.60 -2,082.75 5,968,785.345 641,500.959 19.33 1,693.70 9,513.84 26.58 320.64 8,827.06 8,752.04 -1,268.09 -2,095.09 5,968,797.615 641,488.380 30.27 1,684.09 12/11/2019 2:50:26PM Page 6 COMPASS 5000.15 Build 90 Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J-09CPB2 Design: J-09CPB2 Survey MD (usft) 9,540.29 9,570.29 9,600.58 9,632.44 Tie-in point 9,650.00 KOP Top of Billet 9,681.89 First clean survey 9,710.47 9,740.90 9,771.02 9,801.06 9,830.45 9,860.01 9,890.79 9,921.97 9,950.47 9,980.93 10, 011.08 10,041.17 10,070.86 10,100.49 10,130.77 10,160.50 10,190.58 10, 222.88 BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well J-09 KB @ 75.02usft (J -09A I B OKB) KB @ 75.02usft (J -09A I B OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Baker,. Hughes Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 25.95 328.83 8,850.79 8,775.77 -1,258.56 -2,101.84 5,968,807.013 641,481.449 13.90 1,676.21 29.97 339.04 8,877.29 8,802.27 -1,245.94 -2,107.93 5,968,819.520 641,475.125 20.80 1,665.17 31.53 355.76 8,903.37 8,828.35 -1,230.95 -2,111.23 5,968,834.445 641,471.541 28.61 1,651.22 34.77 7.65 8,930.07 8,855.05 -1,213.61 -2,110.63 5,968,851.786 641,471.803 22.76 1,634.15 37.33 15.44 8,944.28 8,869.26 -1,203.51 -2,108.55 5,968,861.925 641,473.695 29.88 1,623.84 47.73 7.95 8,967.76 8,892.74 -1,18243 -2,104.33 5,968,883.078 641,477.511 36.23 1,602.34 55.10 12.26 8,985.58 8,910.56 -1,160.47 -2,100.37 5,968,905.110 641,481.048 28.34 1,580.041 63.43 16.67 9,001.12 8,926.10 -1,135.19 -2,093.80 5,968,930.513 641,487.130 30.07 1,553.941 70.89 23.05 9,012.81 8,937.79 -1,109.13 -2,084.34 5,968,956.744 641,496.086 31.52 1,526.47 77.37 29.13 9,021.03 8,946.01 -1,083.22 -2,071.63 5,968,982.892 641,508.303 29.05 1,498.451 84.07 35.48 9,025.77 8,950.75 -1,058.74 -2,056.13 5,969,007.663 641,523.328 31.21 1,471.24 90.25 42.69 9,027.24 8,952.22 -1,035.85 -2,037.53 5,969,030.900 641,541.481 3209. 1,444.92 90.43 52.34 9,027.06 8,952.04 -1,015.09 -2,014.86 5,969,052.092 641,563.750 31.36 1,419.82 _ 90.31 62.18 9,026.85 8,951.83 -998.24 -1,988.67 5,969,069.431 641,589.615 31.56 1,397.8( 89.17 71.30 9,026.98 8,951.96 -987.00 -1,962.51 5,969,081.171 641,615.548 32.25 1,381.26 90.40 80.77 9,027.10 8,952.08 -979.66 -1,932.99 5,969,089.076 641,644.925 31.35 1,367.81 89.45 85.48 9,027.14 8,952.12 -976.05 -1,903.06 5,969,093.256 641,674.773 15.94 1,357.93 88.96 90.32 9,027.56 8,952.54 -974.95 -1,873.01 5,969,094.933 641,704.802 16.17 1,350.47 90.09 93.82 9,027.80 8,952.78 -976.02 -1,843.34 5,969,094.428 641,734.479 12.39 1,345.22 89.48 99.60 9,027.91 8,952.89 -979.48 -1,813.93 5,969,091.531 641,763.952 19.62 1,342.35 91.11 104.34 9,027.76 8,952.74 -985.76 -1,784.32 5,969,085.821 641,793.676 16.55 1,342.20 91.87 107.98 9,026.98 8,951.96 -99403 -1,755.77 5,969,078.100 641,822.367 12.50 1,344.22 90.43 112.09 9,026.38 8,951.36 -1,004.33 -1,727.53 5,969,068.342 641,850.804 14.47 1,348.29 8985 117.25 9,026.30 8,951.28 -1,017.81 -1,698.19 5,969,055.429 641,880.396 16.08 1,355.23 12/11/2019 2: 50 26P Page 7 COMPASS 5000.15 Build 90 BP p Final Survey Report Baker Noir Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CP132 Survey Calculation Method: Minimum Curvature Design: J-09CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,252.14 88.87 120.46 9,026.63 8,951.61 -1,031.93 -1,672.56 5,969,041.805 641,906.282 11.47 1,363.58 10,280.76 90.46 124.07 9,026.79 8,951.77 -1,047.20 -1,648.37 5,969,026.997 641,930.763 13.78 1,373.37 10,310.68 91.63 122.37 9,026.25 8,951.23 -1,063.59 -1,623.34 5,969,011.092 641,956.095 6.90 1,384.07 10,340.79 91.07 119.06 9,025.54 8,950.52 -1,078.96 -1,597.47 5,968,996.218 641,982.257 11.15 1,393.60 10,370.89 90.09 117.22 9,025.23 8,950.21 -1,093.16 -1,570.93 5,968,982.535 642,009.061 6.93 1,401.83 10,400.69 88.10 112.89 9,025.71 8,950.69 -1,105.77 -1,543.94 5,968,970.440 642,036.280 15.99 1,408.43 10,430.42 90.25 110.94 9,026.13 8,951.11 -1,116.86 -1,516.37 5,968,959.876 642,064.061 9.76 1,413.41 10,464.14 89.29 107.54 9,026.27 8,951.25 -1,127.97 -1,484.54 5,968,949.378 642,096.097 10.48 1,417.51 10,491.02 88.74 105.02 9,026.73 8,951.71 -1,135.51 -1,458.74 5,968,942.340 642,122.030 9.59 1,419.39 10,520.69 89.39 105.13 9,027.22 8,952.20 -1,143.22 -1,430.10 5,968,935.175 642,150.816 2.22 1,420.85 10,551.41 87.54 102.00 9,028.04 8,953.02 -1,150.43 -1,400.25 5,968,928.546 642,180.793 11.83 1,421.55 10,581.35 87.11 100.51 9,029.44 8,954.42 -1,156.26 -1,370.92 5,968,923.271 642,210.228 5.17 1,421.02 10,610.76 86.68 105.41 9,031.03 8,956.01 -1,162.85 -1,342.31 5,968,917.236 642,238.957 16.70 1,421.38 10,641.47 88.41 108.71 9,032.35 8,957.33 -1,171.85 -1,312.98 5,968,908.800 642,268.448 12.12 1,423.95 10,674.74 89.36 114.78 9,032.99 8,957.97 -1,184.16 -1,282.10 5,968,897.076 642,299.557 18.46 1,429.43 10,700.45 90.09 118.43 9,033.12 8,958.10 -1,195.68 -1,259.12 5,968,886.007 642,322.755 14.48 1,435.76 10,730.99 88.59 121.53 9,033.47 8,958.45 -1,210.93 -1,232.67 5,968,871.259 642,349.488 11.28 1,445.09 10,761.45 90.58 125.60 9,033.69 8,958.67 -1,227.77 -1,207.29 5,968,854.913 642,375.177 14.87 1,456.15 10,791.57 91.35 128.31 9,033.18 8,958.16 -1,245.87 -1,183.23 5,968,837.275 642,399.581 9.35 1,468.73 10,821.25 92.18 126.69 9,032.27 8,957.25 -1,263.93 -1,159.70 5,968,819.671 642,423.454 6.13 1,481.38 10,850.98 94.06 126.03 9,030.65 8,955.63 -1,281.53 -1,135.79 5,968,802.534 642,447.690 6.70 1,493.50 10,880.86 93.07 124.39 9,028.79 8,953.77 -1,298.72 -1,111.43 5,968,785.811 642,472.378 6.40 1,505.13 10,913.86 89.54 121.12 9,028.04 8,953.02 -1,316.57 -1,083.69 5,968,768.502 642,500.449 14.58 1,516.67 10,940.98 90.31 120.04 9,028.08 8,953.06 -1,330.36 -1,060.34 5,968,755.156 642,524.055 4.89 1,525.20 10,971.79 90.64 118.12 9,027.82 8,952.80 -1,345.34 -1,033.42 5,968,740.701 642,551.258 6.32 1,534.11 11,000.86 90.22 114.29 9,027.60 8,952.58 -1,358.17 -1,007.34 5,968,728.369 642,577.574 13.25 1,541.12 11,030.95 91.38 112.32 9,027.18 8,952.16 -1,370.07 -979.71 5,968,716.998 642,605.425 7.60 1,546.88 12/11/2019 2:50:26PM Page 8 COMPASS 5000.15 Build 90 bp BP Baker Final Survey Report Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: J-09CPB2 Design: J-09CPB2 Survey MD Inc (usft) V) 11, 060.47 11,091.37 11,122.05 11,150.54 11,180.84 11, 210.94 11,241.18 11, 270.88 11, 300.47 11, 330.49 11,361.20 11, 390.96 11,420.57 11,450.36 11,480.13 11,510.38 11, 540.53 11,570.44 11,600.38 11,630.43 11,660.21 11,690.36 11,747.00 Projection to TD 91.10 90.71 90.09 90.18 89.45 88.93 84.78 83.33 84.75 85.64 86.84 88.53 89.36 86.87 83.82 86.86 87.33 86.53 85.55 86.16 90.28 89.54 89.54 12/11/2019 2:50.26PM Page 9 COMPASS 5000.15 Build 90 Local Coordinate Reference: Well J-09 TVD Reference: KB @ 75.02usft (J -09A / B OKB) MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 108.47 9,026.54 8,951.52 -1,380.36 -952.05 5,968,707.247 642,633.272 13.07 1,551.05 106.27 9,026.05 8,951.03 -1,389.58 -922.57 5,968,698.591 642,662.926 7.23 1,553.81 109.56 9,025.84 8,950.82 -1,399.02 -893.38 5,968,689.716 642,692.286 10.91 1,556.83 112.61 9,025.77 8,950.75 -1,409.26 -866.80 5,968,679.979 642,719.055 10.71 1,561.20 117.41 9,025.87 8,950.85 -1,422.07 -839.35 5,968,667.701 642,746.743 16.02 1,567.88 120.29 9,026.30 8,951.28 -1,436.59 -812.99 5,968,653.688 642,773.373 9.72 1,576.47 120.61 9,027.96 8,952.94 -1,451.89 -786.97 5,968,638.891 642,799.683 13.76 1,585.90 123.13 9,031.03 8,956.01 -1,467.48 -761.88 5,968,623.781 642,825.060 9.75 1,595.81 128.15 9,034.11 8,959.09 -1,484.63 -737.97 5,968,607.099 642,849.290 17.54 1,607.48 130.92 9,036.62 8,961.60 -1,503.67 -714.91 5,968,588.504 642,872.716 9.66 1,621.19 130.51 9,038.64 8,963.62 -1,523.66 -691.68 5,968,568.966 642,896.319 4.13 1,635.79 130.27 9,039.84 8,964.82 -1,542.93 -669.03 5,968,550.136 642,919.329 5.74 1,649.81 129.99 9,040.38 8,965.36 -1,562.01 -646.40 5,968,531.493 642,942.324 2.96 1,663.65 128.85 9,041.36 8,966.34 -1,580.91 -623.40 5,968,513.033 642,965.678 9.19 1,677.24 125.56 9,043.78 8,968.76 -1,598.85 -599.77 5,968,495.552 642,989.641 15.04 1,689.75 122.99 9,046.24 8,971.22 -1,615.82 -574.86 5,968,479.058 643,014.869 13.14 1,701.05 121.36 9,047.76 8,972.74 -1,631.86 -549.38 5,968,463.516 643,040.655 5.62 1,711.30 118.75 9,049.37 8,974.35 -1,646.82 -523.53 5,968,449.057 643,066.783 9.11 1,720.43 118.88 9,051.43 8,976.41 -1,661.21 -497.36 5,968,435.165 643,093.222 3.30 1,728.94 124.13 9,053.61 8,978.59 -1,676.87 -471.81 5,968,420.001 643,119.059 17.54 1,738.82 126.86 9,054.53 8,979.51 -1,694.15 -447.59 5,968,403.191 643,143.609 16.59 1,750.56 129.27 9,054.58 8,979.56 -1,712.73 -423.85 5,968,385.062 643,167.694 8.36 1,763.68 129.27 9,055.03 8,980.01 -1,748.58 -380.00 5,968,350.060 643,212.216 0.00 1,789.40 12/11/2019 2:50.26PM Page 9 COMPASS 5000.15 Build 90 bp BP Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: J-09CPB2 Survey Calculation Method: Minimum Curvature Design: J-09CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Design Annotations Measured Vertical Local Coordinates Depth Depth +Nl-S +E7 -W (usft) (usft) (usft) (usft) Comment 9,63244 8,930.07 -1,213.61 -2,110.63 Tie-in point 9,650.00 8,944.28 -1,203.51 -2,108.55 KOP Top of Billet 9,681.89 8,967.76 -1,182.43 -2,104.33 First clean survey 11,747.00 9,055.03 -1,748.58 -380.00 Projection to TD 12/11/2019 2:50:26PM Page 10 COMPASS 5000.15 Build 90 WELL DETAILS: J-09 WELLBORE DETAILS: J -09C REFERENCE INFORMATION by Project: PBU Site: J Ground Level: 41.16 Parent Wellbore: J-09CPB2 Co-ordinate (WE) Reference: Well J-09, True North Baker Well: J-09 Northing: 5970105.460 Tie on MD'. 10551.41 Vertical (TVD) Reference: KB @ 75.02usft (J -09A / B OKB) Hughes hes Wellbore: J -09C Easting: 643558.670 Section (VS) Reference: Slot -(O5 ON, 0. 0E) / B OKB) 9 Design: J -09C Latittude: 70° 19' 32.897 N Measured Depth Reference: KB Longitude: 1480 50' 8.927 W Calculation Method Minimum Curvature 5970500 J- 5970250 5970000 5969750 y 5969500 CD O LO 015969250 L 230O AOGCC - Offsets within 500ft Easting (500 usft/in) 641000 641250 641500 641750 642000 642250 642500 642750 643000 06450 643500 3750 644000 644250 644500 644750 645000 ^00 AJ -13 J -09B CS" L o 3C}00 J-166 J-09 0 5970500 O 00 O 1 0 0 oo 4 0 o 70QQ 0 �''o 00 M 5970250 �ooo QJ -18 O 0 Q) 000, o ti i 5970000 i p0 A0O 0 00 J-01 B Al) J-17 S0 J -27B a0 5969750 OO J-0 / J 0C 0'J-09 P 00 o QS IleZ J -23Q5000 J-20PB1 O 5969500 o $00 J-20\ 6000 00 J -09A 00 o ) 0 5969250 O 90 J-09CP81 O O 00 000 v 00 hOpO oo v . 0p0 090p0 o' 5969000 p0� 00 o p0 J-16BPB1 g J -02A 5968750 00 o OpO J-27 p000 5968750 O J-09 0 0, J-16 00 5968500 — _.—_ 00 5968500 J-09CPB2,, 60 O JX-02PB1 I i 5968250 - .J-15 5968250 JX -02 H-27 B J -27A J -09C J -16A - J -20C- - 990 JX -02A l4 641000 641250 641500 641750 642000 642250 642500 642750 643000 643250 643500 6 43 75 0 6 44 00 0 644250 64 500 644750 645000 Easting (500 usft/in) 5EM North America - ALASKA - BP PBU J-09 J -09C J -09C AOGCC Offset Well Report 11 December, 2019 Baker Hughes B P -"0% I& p Anticollision Report Baker s weA� Hughes Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-09 Well Error: 0.00usft Reference Wellbore J -09C Reference Design: J -09C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-09 KB @ 75.02usft (J -09A / B OKB) KB @ 75.02usft (J -09A/ B OKB) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference J -09C Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum centre distance of 500 Error Surface: Pedal Curve Survey Program Date 12/11/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 9,455.00 9,632.44 Survey #1 (J-09CPB1) MWD MWD - Standard 9,650.00 10,551.41 Survey #1 (J-09CP82) MWD MWD - Standard 10,564.00 12,136.00 Survey #1 (J -09C) MWD MWD - Standard 12111/2019 3: 02 58P Page 2 of 130 COMPASS 5000.15 Build 90 X0400 BP 4, 2 by Baker Anticollision Report Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: KB @ 75.02usft (J -09A / B OKB) Reference Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Site Error: 0.00usft North Reference: True Reference Well: J-09 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J -09C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: J -09C Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) EX PR331213 H HURLST J J-02 - J-02 - J-02 1,126.32 1,109.00 472.92 J-02 - J -02A- J -02A 3,507.37 3,575.00 3.42 J-02 - J -02B - J -02B 3,502.57 3,575.00 6.46 J-02 - J-0213PB1 - J-02BPB1 3,502.57 3,575.00 6.46 J-06 - J-06 - J-06 2,851.62 2,850.00 486.34 J-06 - J -06P81 - J-06PB1 2,851.62 2,850.00 486.34 J-07 - J-07 - J-07 2,654.44 2,650.00 402.30 J-07 - J -07A - J -07A 2,671.72 2,675.00 402.44 J-07 - J -07B - J -07B 2,671.72 2,675.00 402.44 J-07 - J -07B - J -07B WP04 2,671.72 2,675.00 402.44 J-08 - J-08 - J-08 2,955.57 2,950.00 103.30 J-08 - J -08A - J -08A 2,953.79 2,950.00 103.25 J-08 - J-08PB1 - J-08PI31 2,955.57 2,950.00 103.30 J-09 - J-09 - J-09 6,422.78 6,425.00 35.24 J-09 - J -09A - J -09A 9,719.20 9,900.00 292.97 J-09 - J -09B - J -09B 10,067.50 10,425.00 136.95 J-09 - J-09BPB1 - J-09BPB1 10,067.51 10,425.00 126.97 J-09 - J-09CPB1 - J -09C WP04 12,125.27 12,050.00 3.22 J-09 - J -09C PB 1- J -09C P B 1 10,164.72 10,125.00 11.21 J-09-J-09CPB2-J-09CP62 11,351.26 11,350.00 26.80 J-12 - J-12 - J-12 2,997.11 3,000.00 296.86 J-13 - J-13 - J-13 1,980.38 1,975.00 197.37 J-13 - J-1 3A - J-1 3A 1,982.03 1,975.00 197.40 J-14 - J-14 - J-14 4,361.87 4,575.00 354.20 J-14 - J -14A - J -14A 4,361.87 4,575.00 354.20 J-15 - J-15 - J-15 3,631.63 4,050.00 131.12 J-15 - J-1 5A - J-1 5A 3,631.63 4,050.00 131.12 J-15 - J-1513 - J-1 5B 3,631.63 4,050.00 131.12 J-18 - J-18 - J-18 2,602.46 2,900.00 226.74 J-18 - J-1 BA - J-1 8A 2,602.46 2,900.00 226.74 J-20 - J-20 - J-20 970.47 975.00 32.71 J-20 - J -20A - J -20A 977.96 975.00 32.89 J-20 - J -20B - J -20B 978.51 975.00 32.91 J-20 - J -20C - J -20C 980.15 975.00 32.95 J-20 - J -20C - J -20C WP6.0 978.60 975.00 32.91 J-20 - J-20PB1 - J-20PB1 970.47 975.00 32.71 J-23 - J-23 - J-23 3,065.71 3,075.00 76.60 J-23 - J -23A - J -23A 3,074.35 3,075.00 76.91 J-27 - J-27 - J-27 11,281.66 9,625.00 353.27 J-27 - J -27A - J -27A 11,285.17 9,875.00 46.14 J-27 - J -27B - J -27B 11,342.71 9,650.00 337.75 JX -02 - JX -02 - JX -02 8,851.97 8,675.00 214.33 JX -02 - JX -02A - JX -02A 8,836.02 8,650.00 216.94 JX -02 - JX-02PB1 - JX-02PB1 8,851.97 8,675.00 214.33 Plans: Gwydyr Development (SHL) Q 12111/2019 3:02:58PM Page 3 of 130 COMPASS 5000.15 Build 90 Remarks WELL NAMEJ-09C CEMENT REPORT Date : 12/14/2019 Shoe 11107' Hole Size : 4.25" FC (�: Casinq Size: 2-7/8" x 3-1/4" Top Liner (a-: 8272' Preflush (Spacer) Type: 1% KCI Density (ppg) : 8.4 Volume pumped (bbls) : 200 Lead Slurry Type : G Volume (bbls): 25 Density (ppg) : 15.3 Yield : 1.32 Sacks : 106.3352273 Mixing / Pumping Rate (bpm) : 1.5 Tail Slurry Type : Volume (bbls) : Density (ppg) ui Yield : Sacks : #DIV/0! Mixing / Pumping Rate (bpm) : U) �U-) Post Flush (Spacer) LL Type : Fresh water + 1.5 ppb GeoVis XT Density (ppg) : 8.4 Rate (bpm) : 1.5 Volume: 90 Displacement: Type : 1% KCI Density (ppg) : 8.4 Rate (bpm) : 1.5 Volume (actual / calculated) : 9.3 bbl FCP (psi) : 4000 Pump used for disp : Rig Plug Bumped? X Yes No Bump press : 4500 Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job : 50 Cement returns to surface? Yes X No Spacer returns? X Yes No Vol to Sur Cement In Place At: 19:30' Date : 12/14/2019 Estimated TOC : 9900' Method Used To Determine TOC: Volume Volume lost during displacement (bbls) : 15.70 Remarks THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU J -09C BP Exploration (Alaska), Inc. Permit to Drill Number: 219-148 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Surface Location: 1248' FNL, 804' FEL, SEC. 09, Tl 1N, RUE, UM Bottomhole Location: 3466' FNL, 252' FEL, SEC. 09, TI IN, R13E, UM Dear Mr. Mclaughlin: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, A U J y M. Price Chaff DATED this /' of October, 2019. STATE OF ALASKA n ASKA OIL AND GAS CONSERVATION COMMIS° OCT 2 3 2019 PERMIT TO DRILL 20 AAC 25.005 Alm% 1 a. Type of Work:1 b. Proposed Well Class: Exploratory - Gas ❑ Service -WAG ElService - Disp 111 c. Specify i w I 0 f Drill ElLateral ❑ Stratigraphic Test ❑ Development - Oil R1 Service - Winj ❑ Single Zone 0 Coalbed Gas ❑ Gas Hydrates ❑ Redrill p Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket Q Single Well ❑ 11 Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 PBU J -09C Address: 3. 6. Proposed Depth: TVDss: 8910' 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 12757' TVD: 8985' PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): n Volt -1 Yq-48 ADL 028281 8. DNR Approval Number: 13. Approximate spud date: Surface: 1248' FNL, 69-4' FEL, Sec. 09, T11 N, R13E, UM 2425' FNL, 3027' FEL, Sec. 09, T11N, R13E, UM 85-24 NOVERiE€r 1, 20119 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 3466' FNL, 252' FEL, Sec. 09, T11 N, R13E, UM 19730 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 75.02 feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 643559 ' y- 5970105 Zone - ASP 4 GL Elevation above MSL: 40.55 feet 19 16. Deviated wells: Kickoff Depth: 9455 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 105 degrees Downhole: 3191 Surface: 2320 18 Casing Program: Specifications To - Settin De th - Bottom Cement Quantity, c.f. or sacks Hole I Casing Weight Grade Couplinq Len th MD TVD MD TVD(including stage data 4-1/4" 3-1/2"x3-1/4" 9.3#/6.6# 13Cr85 STL/TCII 3506' 9250' 8616' 12756' 8985' 251 sxClass'G' x2-7/8" /6.5# /STL 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): 1 Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 12133 9035 10820,11409 10820 9015 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 213 cu ft Cement 35-115 35-115 Surface 2667 13-3/8" 4172 cu ft Permafrost ll, 97 cu ft Permafrost II 34-2701 34-2701 Intermediate 6067 9-5/8" 1177 cu ft HowcoLite, 250cu ft Class'G', 135 cu ft PF 'C' 33-6100 33-5748 Liner 3751 7-5/8" 36 Bbls Class'G' 5849-9600 5534-8881 Liner 2623 3-1/2" x 3-1/4" x 2-7/8' 132 sx Class'G' 9505-12128 8815-9036 Perforation Depth MD (ft): 10439 - 12070 Perforation Depth ND (ft): 9006-9040 Hydraulic Fracture planned? Yes ❑ No 171 20. Attachments Property Plat ❑ BOP Sketch Q Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 121 20 AAC 25.050 requirements Q 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Hartlev. Josephine from without prior written approval. Authorized Name Mclaughlin, Sean M Contact Email Josephine. HartleyCd bp.com Authorized Title Engineering T am Lead - CTD Contact Phone +1 9075644570 Authorized Signature Date PIT -369 Commission Use Only Permit to Drill AT Permit Appro al See cover letter for other q Number: `� API : 50- 029- 20251-03-00 P• Date: � ` 1 requirements: Condit ons of approval : Ifboxis checked, well may notrbe used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: R Other: � �� "'' �O S Samples req'd: Yes ElNo Mud log req'd: Yes ❑ No ?/ A. H2S measures Yes 9/ No ElDirectional svy req'd: Yes P No ❑ 2�y P+Ay—' � � •L� pbt7op` Spacing exception req'd: Yes El No 31� Inclination -only svy req'd Yes El No �a ffff 1 Post initial injection MIT req'd: Yes ❑ No ❑ 1 APPROVED BY Approved by. COMMISSIONER THE COMMISSION Date: Form 10-401 Revised 5/2017 This permit is valid for 24 months to1J3aJptbv8l20 AAC 25.005(g)) Submit Form and Attachments in Duplicate 5DUo /z8/!9 To: Alaska Oil & Gas Conservation Commission From: Josi Hartley Obp CTD Engineer Date: October 22, 2019 Re: J-09C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well J -09B with the Nabors CDR2 Coiled Tubing Drilling rig on or around December 111, 2019. Proposed plan for J -09C: The coil sidetrack J -09C will be a 3302' sidetrack drilled below the 14N shale in Zone 1B and the well will toe up into Zone 2A. The well is scheduled to be drilled on or around December 151. The J -09C sidetrack will be a dual string exit from the existing 4-1/2" and 7-5/8" liner and casing. A 4-1/2" monobore whipstock will be set pre -rig with TOWS at 9455'. The well will kick off into Zone 2 below the chert -rich area of Zone 3. The proposed sidetrack will be completed with 3-1/4" x 2-7/8" L-80 solid liner, cemented in place and selectively perforated. SU*jIbQ� tig Work (scheduled to begin December 1st, 2019) A�c 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2320 psi). /t . Cr +'9 2. Mill 3.80" Window + 10' of rathole 3. Drill build section: 4.25" OH, —427' (28 deg DLS in build planned). 4. Drill lateral section: 4.25" OH, 2832' (12 deg DLS in lateral planned). 5. Run 3-1/4" x 2-7/8" L-80 liner to TD. 6. Pump primary cement job: 51.9 bbls, 15.3 ppg Class G, TOC at TOL (9250 MD)*. 7. Perform RPM Log. J 8. Perforate 1000' (2" Millenium guns, 6 spf). 9. Freeze protect well to a min 2,200' TVDss. 10. Close in tree, RDMO. * Anoroved alternate Mue placement per 20 AAC 25.1120) Post -Rig Work: 1. V: Tree Work 2. F: Test Liner Lap 3. S: Set LTP if necessary. Flowback 3 days. Set KO valve if accessible. 4. C: Contingent N lift if IA is filled with cement above GLMs. Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (611 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, STL, 13Cr solid liner: 9,300' MD —12,756' MD • 3-1/4", 6.6#, TCII, 13Cr solid liner: 9,270' MD — 9,300' MD • 3-1/2", 9.3#, STL 13Cr solid liner: 9,250' MD —9,270' MD • A minimum 51.9 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at "'9,250' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (611 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 105°, inclination at kick off point is 37°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 19,730' • Distance to nearest well within pool —19' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • Gamma Ray / CCL / RPM log planned on -rig through the entire production liner. Perforating: • Perforating: 1000' of perforations on -rig, 2" Max Force guns, 60 deg random phasing, 6 spf, perf guns. Anti -Collision Failures: —Z ---Z M �o•+.� /; • None. All offset wells pass BP anti -collision scan criteria.�'}'a�S O J "Z ! 1a so,_e Hazards: • Most recent H2S sample on J-0913: 19 ppm (11/2/18). Reservoir Pressure: • The reservoir pressure on J -09C is expected to be 3191 psi at 9703' TVDSS (7.05 ppg equivalent). V/ • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2320 psi.*A1� N1 Pp w4 C 0 • J A min EMW of 8.4 ppg for this well will provide 611 psi over -balance to the reservoir. 3 Josi Hartley CC: Well File CTD Engineer Joseph Lastufka 564-4570 MCI VV6IFEAD= M:EVOY ACTUATOR= - OKB- ELB/ = - -- SH 3000 73.9T REF ELEV = — 75.02 BF. E_EV = _---! 4122' KOP = 2800' Max Argle = - 94" @ 12066- 2066'Dat un WD =------- Datum 9582 Datum TVD = - --- 8800' SS 13-3/8" CSG, 72#, N-80, D = 12.347" 2700' 1/2" BKR KB PATCH, D = 2.45" (05/08/13) I --J 5199' - 5236' Minimum ID = 2.31" @ 9517' 2-7/8" OTIS X NIP INSIDE KB LTP 9-5/8' CSG, 47#, N-80, D = 8.681" 6100' /2" TBG, 12.6#, L-80 NSCT, .0152 bpf, D = 3.958" I--1 9552' 3-1/2" LNR, 9.3#, L-80 STL, .0087 bpf, D = 2-992" 1-� 9587' I4-1/2"WHIPSTOCK (03/29/13) I-- 9595 7-5/8" LNR, 29.7#, L-80, .0459 bpf, D = 6.875" -9600 PERFORATION SUMMARY REF LOG: MC NU GR/ CCL ON 04/15/13 ANGLE AT TOP PERF: 88° @ 10439 Note: Refer to Production DB for historical pert data SIZE SPF I INTERVAL Opn/Sgz I SHOT SQZ 2" 6 10439 - 10503 O 04/06/19 2 1 2^ 6 10539 - 10571 O 04/06/19 RK 2" 6 10899 - 10963 C 05/24/18 2" 6 11260 - 11324 C 05/23/18 2" 6 11670- 11870 C 04/16/13 2" 6 11970 - 12070 C 04/16/13 3-1/4" LNR, 6-6#, L-80 TCN, -0079 bpf, D = 2.850" L �TD 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, D = 2-441" 10984' 12090' 12128' J 0 9 B SAFETY NOTES: WELL ANGLE 700 @ 9725' *** CHI E NIPPLES*PRE J -09B W ELLBORE'S NOT bHOW N *** 2095' 4-1/2^ OTIS SSSVN, D = 3.813" I. 2095' 4-12" BP STOP, D = 2.00" (05/14/19) 2183' 9-5/s^ FOC 2687' 9-5/8' DV COLLAR T GAS LIFTMANDRELS 5849' H 9-5/8" X 7-5/8" BKR PKR, D= 6.875" 5860' 1 9-5/8" X 7-5/8" BKR HGR, D = 6.875" 9-5/8" MLLOUT WINDOW (J -09A) 6100' - 6150' I 9427' 4-1/2" OTIS X NIP(9-CR), D = 3-813" 9489' 7-5/8" X 4-1/2" BKR SABL-3 PKR, D = 3.937" 9505' 45 KB BKR LTP (04/30/13) 9517' 2-7/8" OTB X NIP, D = 2.31" 1 9523' �� 4-112" OTIS X NIP (9 -CR), D = 3.813" BERND KB LNR TOP PKR 9525' 3.70" GEN I DEPLOY SLV, D = 3.00" 9540' 4-1/2" OTIS XN NIP (9 -CR), D = 3.725' 9552' 4-1/2" WLR, D = 3.958" BEHIND 9547' ELMD TT LOGGED 08/13/97 CT LNR I 9587 —F3 -1/2--X 3-3/16" XO, D = 2.786" F7-5/8' MLLOUT WINDOW (J -09B) 9600' - 9607- 10820' J --j2-1/8" BKR BP(04/06/19) 10984' I --j 3-1 /16" X 2-7/8" XO, D = 2-377" 11409' 2.22" BKR CIBP (0524/18) PRI DHOE BAY UNIT WELL J -09B PERMIT No: '2'130190 API No: 50-029-20251-02 SEC 9, T11 N, 131 3E, 1248' FNL & 804' FEL DATE REV BY COMMENTS DATE REV BY OOMVEfYTS ST MD TVD DEV TYPE VLV LATCH PORT DATE BP Exploration (Alaska) 04/20/19 JBB/JMD+ PLUG SET (04/15/19) 2 1 4356 5760 4270 5458 31 32 MMG MMG DOM MYRK RK 16 0 05/16/13 09/14/94 5849' H 9-5/8" X 7-5/8" BKR PKR, D= 6.875" 5860' 1 9-5/8" X 7-5/8" BKR HGR, D = 6.875" 9-5/8" MLLOUT WINDOW (J -09A) 6100' - 6150' I 9427' 4-1/2" OTIS X NIP(9-CR), D = 3-813" 9489' 7-5/8" X 4-1/2" BKR SABL-3 PKR, D = 3.937" 9505' 45 KB BKR LTP (04/30/13) 9517' 2-7/8" OTB X NIP, D = 2.31" 1 9523' �� 4-112" OTIS X NIP (9 -CR), D = 3.813" BERND KB LNR TOP PKR 9525' 3.70" GEN I DEPLOY SLV, D = 3.00" 9540' 4-1/2" OTIS XN NIP (9 -CR), D = 3.725' 9552' 4-1/2" WLR, D = 3.958" BEHIND 9547' ELMD TT LOGGED 08/13/97 CT LNR I 9587 —F3 -1/2--X 3-3/16" XO, D = 2.786" F7-5/8' MLLOUT WINDOW (J -09B) 9600' - 9607- 10820' J --j2-1/8" BKR BP(04/06/19) 10984' I --j 3-1 /16" X 2-7/8" XO, D = 2-377" 11409' 2.22" BKR CIBP (0524/18) PRI DHOE BAY UNIT WELL J -09B PERMIT No: '2'130190 API No: 50-029-20251-02 SEC 9, T11 N, 131 3E, 1248' FNL & 804' FEL DATE REV BY COMMENTS DATE REV BY OOMVEfYTS 08/19777 RWN 26 INITIAL COMPLETION 04/20/19 DD/JMD+ PERF & ELEV UPDATES (04/171 09/09/94 0-14 SIDETRACK(J-09A) 04/30/19 JLS/JMD TREE GO(0428/19) 04/14/13 NORDIC 1 CTD SIDETRACK (J-096) 06/18/19 GJB/JMD PULL XX PLUGISET BP STOP 10/10/18 W/JMD OORRECTION TO PERFS 04/13/19 JTWJMD+ ADPERF-, SET BP (04106/19) BP Exploration (Alaska) 04/20/19 JBB/JMD+ PLUG SET (04/15/19) WELLHEAD= McEVOY ACTUATOR = SH 3000 OKB. ELEV = 73.9T REF ELEV = 75.02 BF. ELEV = 41.22' KOP = 2800' Max Angle = 94" @ 12066' Datum MD = 9582' Datum TVD = 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12-347" 2700' — TOC in IA (4200' TVD) 4274' 4-1/2" BKR KB PATCH, ID = 2.45" (05/08/13) 5199' - 5236! Minimum ID = 2.31" @ 9517' 2-7/8" OTIS X NIP INSIDE KB LTP 9-5/8" CSG, 47#, N-80, ID = 8-681" 6100' 14-1/2" TBG, 12.6#, L-80 NSCT, .0152 bpf, ID = 3.958" 3-1/2" LNR, 9.3#, L-80 STL, .0087 bpf, ID = 2.992" H 9587' 7-5/8" LNR, 29.7#, L-80_0459 bpf, ID = 6.875" R3IFORATON SL&WRY REF LOCG, MCNJ GR/ CCL ON 04/15/13 ANGLE AT TOP PETS: 88"@ 10439 - 0439'N Note te: Refer to Protlu bw IB for historical pert data SiZE SPF WERVAL OpNSgz SHOT I SOZ 2" 6 10439 - 10503 O 04/06119 RK RK 2" 6 10539 - 10571 O 04/06119 2" 6 10899-10963 C 05/24/18 2" 6 11260-11324 C 05/23/18 2' 6 11670- 11870 C 04/16113 2" 6 11970- 12070 C 04/16113 J 0 9 B SAFr'Y NOTES: WELL ANGLE 700 @ 9725' *** CH, JE NIPPLES*** PRE J -09B W ELLBORE'S NOT SHOWN *** 2095' 4-1/2" OTIS SSSV N, ID = 3.813" ,m �I;;i I 2096 4-12"BPSTOP, ID=2.00'(05/14/19) 3-1/4" LNR, 6.6#, L-80 TCII, .0079 bpf, ID = 2.850" 10984 PBTD 12090' 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441" 12121 2183' -19-5/8" FOC 2687' 9-5/8" DV COLLAR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 4356 5760 4270 5458 31 32 MMG MMG DOME DMY RK RK 16 0 05/16/13 09/14/94 5849' 9-5/8" X 7-5/8" BKR PKR, ID = 6.875" 5860' 9-5/8" X 7-5/8" BKR HGR, ID = 6.875" 9-5/8" MILLOUT WINDOW (J -09A) 6100'- 6150' 9427' 4-1/2" OTIS X NIP (9 -CR), ID = 3.813" 9489' 7-5/8" X 4-1/2" BKR SABL-3 PKR, ID = 3.937" 9505' 45 KB BKR LTP (04/30/13) 951T OTS X N 2-7/8" IIP, ID = 2-31" 9523' �4-1/2" OTIS X NP (9-0R), ID = 3.813" BEHIND KB LNR TOP I 9525' 3.70" GEN II DEPLOY SLV, ID = 3.00" 9540' -14-1/2" OTIS XN NIP (9 -CR), ID = 3.725" 9552' 4-1 /2" WLEG, ID = 3.958" BEHIND 9547' ELMD TT LOGG®08/13/97 CT LNR 9587' 1-13-1/2" X 3-3/16" XO, ID = 2.786" 7-5/8" MLLOUT WINDOW (J -09B) 9600' - 9607' 1 10820' H2-1/8"BKRBP(04/06/19) I 10984' H 3-1/16" X 2-7/8" XO, D = 2.377" 11409' 1--12.22" BKR CIBP (05/24/18) 047E REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY LINFF WELL: J -09B PEFMTNo:'t130190 AR Nr. 50029-20251-02 SEC 9, T11 K R13E, 1248' FN- & 804' FB - 08119!!7 RWM26 INTIAL CCMPLEnON 04/20/19 DD/JMDl PERF & ELEV LIFDATES (04/17/ 09/09194 D-14 SIDETRACK(J-09A) 04/14M3 NORDIC 1 CTD SIDETRACK(J-09B) 04/30/19 JLS/JMD TREE 0.10(04/28/19) 06/16119 GJB/JMJ RJLL XX PLLG/SET IBPSTOF 10/10/18 JW/JMD ETON TO PERFS 04/13/19 JTWJMDt ADPEW; SEF IBP(04/06/19) 04/20/19 JBWJMD� PLUG SET (04/15/19) 11 BP Bcploration (Alaska) TREE = CIW WELLHEAD = McEVOY ACTUATOR = BAKER C OKB. ELEV = 73.97' REF ELEV = 75.02 BF. ELEV = KOP = 41.22' 2800' Max Angle = 94° 12066' Datum MD 9582' Datum TVD = 8800' SS PROF _,SED CTD SDTRCK 13-3/8" CSG, 72#, N-80, ID = 12.347" 2700' 4-1/2" BKR KB PATCH, ID = 2.45" (05/08/13) 1--15199- - 5236' Minimum ID = 2.31" @ 9517' 2-7/8" OTIS X NIP INSIDE KB LTP 9-5/8" CSG, 47#, N-80, ID = 8.681" 6100' MILLOUT WINDOW (J -09C) 3-1/4" LNR, 6.6#, L-80, 0.0076 bpf, ID = 2.80" 2-7/8" LNR, 6.5#, L-80, 12756' 0.0059 bpf, ID = 2.441 TD 12756' 1 9430' 1 1 9430' 1 14-1/2" TBG, 12.6#, L-80 NSCT, .0152 bpf, ID = 3.958" I 13-1 /2" LNR, 9.3#, L-80 STL, .0087 bpf, ID = 2.992" I J 0 9 C SAFF—Y NOTES: WELL ANGLE 700 @ 9725' *** CHI E NIPPLES*** PRE J -09B W ELLBORE'S NOT SHOWN *** 2095' 4-1/2" OTIS SSSV N, ID = 3.813" O 2183' 9-5/8" FOC 2687' 9-5/8" DV COLLAR GAS LIFT MANDRELS _wwST PERFORATION SUMMARY 9517' REF LOG: MCNL/ GR/ CCL ON 04/15/13 MD TVD DEV TYPE VLV LATCH PORT DATE SOZ 2 1 4356 5760 4270 5458 31 32 MMG MMG DOME DMY RK RK 16 0 05/16/13 09/14/94 C 3-1/4" x 2-7/8" XO, ID = x_xxx" 9552' 1 9587' 1 I4-1/2" WHIPSTOCK (03/29/13) I 9595' 7-5/8" LNR, 29.7#, L-80_0459 bpf, O = 6.875" —9600 3-1/4" LNR, 6.6#, L-80 TCII, .0079 bpf, ID = 2.850" 10984' PBTD 12090' 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441" 12128- '-5849' 9-5/8" X 7-5/8" BKR PKR, ID = 6.875" 5860' 9-5/8" X 7-5/8" BKR HGR, ID = 6.875" 9-5/8" MILLOUT WINDOW (J -09A) 6100' - 6150' ???? TOP OF IA CMT 9250' 3 7" BKR DEPLOYMENT SLV, ID = XXXX" ???? 3-1/4" HES X NIP, ID = X.XXX" 9427' I—J4-1/2" OTIS X NIP (9 -CR), ID = 3.813" 9455'4-1/2" BKR MONOBORE WHIPSTOCK 9489' 7-5/8" X 4-1/2" BKR SABL-3 PKR, ID = 3.937" 9505' 45 KB BKR LTP (04/30/13) 9517' PERFORATION SUMMARY 9517' REF LOG: MCNL/ GR/ CCL ON 04/15/13 9523' ANGLE ATTOP PERF: 87°@ 10899' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL O NS z SHOT SOZ 2" 6 10439-10503 C 04/06/19 2" 6 10539 - 10571 C 04/06/19 2" 6 10899-10963 C 05/24/18 2" 6 11260-11324 C 05/23/18 2" 6 11670-11870 C 04/16/13 2" 6 11970-12070 C 04/16/13 3-1/4" LNR, 6.6#, L-80 TCII, .0079 bpf, ID = 2.850" 10984' PBTD 12090' 2-7/8" LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441" 12128- '-5849' 9-5/8" X 7-5/8" BKR PKR, ID = 6.875" 5860' 9-5/8" X 7-5/8" BKR HGR, ID = 6.875" 9-5/8" MILLOUT WINDOW (J -09A) 6100' - 6150' ???? TOP OF IA CMT 9250' 3 7" BKR DEPLOYMENT SLV, ID = XXXX" ???? 3-1/4" HES X NIP, ID = X.XXX" 9427' I—J4-1/2" OTIS X NIP (9 -CR), ID = 3.813" 9455'4-1/2" BKR MONOBORE WHIPSTOCK 9489' 7-5/8" X 4-1/2" BKR SABL-3 PKR, ID = 3.937" 9505' 45 KB BKR LTP (04/30/13) 9517' 2-7/8" OTIS X NIP, ID = 2.31" 9517' 2-7/8" XX PLUG (04/15!19) 9523' 4-1/2" OTIS X NP (9 -CR), ID = 3.813" (9 -CR), BEHIND KB LNR TOP PKR 9525' 3.70" GEN II DEPLOY SLV, ID = 3.00" 9540' 4-1/2" OTIS XN NIP ID = 3.725" 09/09/94 D-14 SIDETRACK (J -09A) (9 -CR), 9552' 4-1 /2" WLEG, ID = 3.958" BEHIND 9547' ELMD TT LOGGED 08/13/97 CT LNR 9587' 1-13-1/2" X 3-3/16" XO, ID = 2.786" 7-5/8" MILLOUT WINDOW (J -09B) 9600' - 9607' 10820' 1--12-1/8" BKR IBP (04/06/19) 10984' 1-1 3-1 /16" X 2-7/8" XO, ID = 2.377" 11409' 1-12.22" BKR CIBP (05/24/18) DATE REV BY COMMENTS DATE REV BY COMMENTS 08/19/77 RWN 26 INITIAL COMPLETION 09/09/94 D-14 SIDETRACK (J -09A) 04/14/13 NORDIC 1 CTD SIDETRACK(J-09B) XX/XX/X JH/JMD+ PROPOSED CTD SIDETRACK (J -09C) PRUDHOE BAY UNIT WELL: J -09C PERMIT No: XXXXXXX API No: 50 -029 -20251 -XX ??? SEC 9, T11 N, R13E, 1248' FNL 8 804' FEL BP Exploration (Alaska) b p North America PBU J J-09 PLAN J -09C Plan: J -09C WP04 - ALASKA - BP BP Coil Tubing Report 22 October, 2019 Baker 5�1 Hughes by BP BP Coil Tubing Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-09 Wellbore: PLAN J -09C Design: J -09C WP04 Local Co-ordinate Reference: Well J-09 TVD Reference: Mean Sea Level MD Reference: KB @ 75.02usft (J -09A / B OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 ' OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site J, TR -11-13 Site Position: Northing: 5,968,224.220 usft Latitude: 70° 19' 14.845 N From: Map Easting: 641,155.790 usft Longitude: 148° 51'20.092 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.08 ° Well J-09, J-09 Well Position +N/ -S 0.00 usft Northing: 5,970,105.460 usft Latitude: 70° 19'32.897 N +E/ -W 0.00 usft Easting: 643,558.670 usft Longitude: 1480 50'8,927 W Position Uncertainty 0.00 usft Wellhead Elevation: 41.22 usft Ground Level: 40.55 usft Wellbore PLAN J -09C Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BG G M2018 12/1/2019 16.53 80.91 57,404.00198567 Design J -09C WP04 Audit Notes: Version: Phase: PLAN Tie On Depth: 9,417.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) -41.22 0.00 0.00 125.00 10/22/2019 1:44. 12AM Page 2 COMPASS 5000.15 Build 90 bBP p BP Coil Tubing Report Baker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: Mean Sea Level Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: PLAN J -09C Survey Calculation Method: Minimum Curvature Design: J -09C WP04 Database: EDM R5K - Alaska PROD - ANCP1 Survey Tool Program Date 10/22/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 9,417.00 12,756.94 J -09C WP04 (PLAN J -09C) MWD MWD - Standard Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (usft) V) V) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) V) 9,417.00 38.00 304.00 8,673.45 -1,303.38 -2,051.56 5,968,763.175 641,532.573 0.00 -932.96 0.00 Tie -In -Point 9,455.00 38.94 305.49 8,703.20 -1,289.90 -2,070.99 5,968,776.275 641,512.899 3.47 -956.60 45.18 KOP 9,475.00 37.14 305.49 8,718.95 -1,282.75 -2,081.02 5,968,783.236 641,502.730 9.00 -968.92 180.00 End 9deg/100 9,500.00 30.14 305.49 8,739.75 -1,274.71 -2,092.29 5,968,791.053 641,491.310 28.00 -982.76 -180.00 9,513.90 26.25 305.49 8,752.00 -1,270.90 -2,097.64 5,968,794.762 641,485.892 28.00 -989.32 180.00 26P 9,515.00 25.94 305.49 8,752.99 -1,270.62 -2,098.03 5,968,795.035 641,485.493 28.00 -989.81 -180.00 4 9,536.00 24.52 318.90 8,772.00 -1,264.66 -2,104.64 5,968,800.862 641,478.772 28.00 -998.64 110.00 25P 9,590.04 26.73 353.99 8,821.00 -1,244.01 -2,113.33 5,968,821.348 641,469.686 28.00 -1,017.61 97.85 24P 9,600.00 27.97 359.43 8,829.85 -1,239.44 -2,113.59 5,968,825.907 641,469.341 28.00 -1,020.44 66.03 9,630.29 32.84 13.22 8,856.00 -1,224.31 -2,111.78 5,968,841.068 641,470.862 28.00 -1,027.63 61.20 23N 9,633.88 33.51 14.60 8,859.00 -1,222.41 -2,111.31 5,968,842.980 641,471.297 28.00 -1,028.34 49.28 23P 9,653.51 37.37 21.35 8,875.00 -1,211.60 -2,107.77 5,968,853.848 641,474.627 28.00 -1,031.64 48.13 22P 9,700.00 47.65 33.26 8,909.28 -1,183.98 -2,093.15 5,968,881.745 641,488.713 28.00 -1,035.51 42.62 10/2212019 1:44:12AM Page 3 COMPASS 5000.15 Build 90 BP by BP Coil Tubing Report Baker Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU TVD Reference: Mean Sea Level Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: PLAN J -09C Survey Calculation Method: Minimum Curvature Design: J -09C WP04 Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 9,716.54 51.55 36.54 8,920.00 -1,173.66 -2,085.94 5,968,892.202 641,495.728 28.00 -1,035.52 33.79 PGOC (Heel) 9,735.03 56.00 39.82 8,930.93 -1,161.95 -2,076.71 5,968,904.086 641,504.726 28.00 -1,034.68 31.66 5 9,744.35 58.01 41.80 8,936.00 -1,156.03 -2,071.60 5,968,910.096 641,509.720 28.00 -1,033.89 40.00 14N 9,788.30 67.86 50.11 8,956.00 -1,128.98 -2,043.45 5,968,937.683 641,537.344 28.00 -1,026.35 38.92 HOT (Heel) 9,800.00 70.55 52.11 8,960.15 -1,122.11 -2,034.94 5,968,944.707 641,545.721 28.00 -1,023.31 35.12 9,882.76 90.00 64.96 8,974.12 -1,080.06 -1,965.71 5,968,988.078 641,614.128 28.00 -990.72 34.41 6 9,900.00 94.53 66.61 8,973.44 -1,072.99 -1,950.01 5,968,995.440 641,629.692 28.00 -981.91 20.00 9,901.77 95.00 66.78 8,973.29 -1,072.30 -1,948.39 5,968,996.169 641,631.297 28.00 -980.99 20.07 End 28deg/100ft 10,000.00 95.00 78.62 8,964.73 -1,043.25 -1,855.13 5,969,026.995 641,723.981 12.00 -921.25 89.48 10,041.77 95.00 83.65 8,961.09 -1,036.83 -1,814.03 5,969,034.191 641,764.948 12.00 -891.26 89.78 8 10,100.00 92.58 90.22 8,957.24 -1,033.74 -1,756.04 5,969,038.398 641,822.858 12.00 -845.54 110.00 10,200.00 88.37 101.46 8,956.40 -1,043.90 -1,656.75 5,969,030.138 641,922.322 12.00 -758.37 110.44 10,220.71 87.50 103.79 8,957.15 -1,048.42 -1,636.55 5,969,026.002 641,942.600 12.00 -739.23 110.53 9 10,300.00 87.53 113.31 8,960.59 -1,073.60 -1,561.54 5,969,002.269 642,018.072 12.00 -663.35 90.00 10,400.00 87.67 125.32 8,964.79 -1,122.43 -1,474.59 5,968,955.109 642,105.937 12.00 -564.11 89.59 10,420.71 87.72 127.81 8,965.62 -1,134.76 -1,457.97 5,968,943.102 642,122.789 12.00 -543.43 89.08 10 10,500.00 87.91 118.29 8,968.65 -1,177.92 -1,391.64 5,968,901.221 642,189.931 12.00 -464.33 -89.00 10,600.00 88.24 106.29 8,972.02 -1,215.76 -1,299.33 5,968,865.157 642,282.936 12.00 -367.02 -88.64 10,700.00 88.65 94.29 8,974.74 -1,233.59 -1,201.15 5,968,849.216 642,381.427 12.00 -276.37 -88.23 10/2212019 1:44:12AM Page 4 COMPASS 5000.15 Build 90 Obp Company: Project: Site: Well: Wellbore: Design: Planned Survey MD (usft) 10,700.7' 11 10,800.0( 10,820.7- 12 10,900.0( 11,000.0( 11,085.7' 13 11,100.0( 11,200.0( 11,300.0( 11,365.7' 14 11,400.0( 11,500.0( 11,600.0( 11,645.7' 15 11, 700.0( 11, 800.0( 11,900.0( 11,925.7' 16 12, 000.0( 12,100.0( 12,155.71 17 North America - ALASKA - BP PBU J J-09 PLAN J -09C J -09C WP04 Inc V) 88.65 88.68 88.69 89.04 89.52 89.94 89.94 89.94 89.95 89.95 90.06 90.37 90.67 90.79 91.07 91.54 91.95 92.04 92.02 91.91 91.81 BP BP Coil Tubing Report Azi TVDSS NIS V) (usft) (usft) 94.21 8,974.76 -1,233.64 106.12 8,977.08 -1,251.12 108.61 8,977.56 -1,257.31 118.12 8,979.13 -1,288.71 130.11 8,980.39 -1,344.69 140.39 8,980.79 -1,405.48 138.67 8,980.81 -1,416.35 126.67 8,980.90 -1,484.01 114.67 8,981.00 -1,534.93 106.79 8,981.05 -1,558.17 110.90 8,981.05 -1,569.24 122.90 8,980.67 -1,614.40 134.89 8,979.76 -1,677.08 140.38 8,979.18 -1,710.84 133.87 8,978.30 -1,750.60 121.88 8,976.01 -1,811.86 109.88 8,972.95 -1,855.40 106.79 8,972.06 -1,863.49 115.71 8,969.42 -1,890.37 127.72 8,965.99 -1,942.81 134.41 8,964.18 -1,979.37 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: E/W Northing (usft) (usft) -1,200.44 5,968,849.177 -1,102.92 5,968,833.560 642,499.848 -1,083.16 12.00 5,968,827.760 -1,010.47 642,656.799 5,968,797.755 12.00 -927.84 5,968,743.370 642,727.686 -867.58 12.00 5,968,683.749 -858.30 642,889.152 5,968,673.060 12.00 -784.92 5,968,606.823 -699.06 5,968,557.556 -637.66 5,968,535.494 -605.21 5, 968, 525.044 -516.20 5,968,481.599 -438.51 5, 968, 420.428 -407.73 5,968,387.265 -370.81 5, 968, 348.224 -292.04 5,968,288.483 -202.27 5,968,246.667 -177.88 5,968,239.054 -108.76 5,968,213.501 -23.90 5,968,162.696 18.06 5,968,126.952 Well J-09 Mean Sea Level KB @ 75.02usft (J -09A / B OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Easting DLeg (usft) (°1100usft) 642, 382.138 12.00 642,479.974 12.00 642,499.848 12.00 642, 573.118 12.00 642,656.799 12.00 642,718.207 12.00 642,727.686 12.00 642,802.349 12.00 642,889.152 12.00 642,950.989 12.00 642,983.635 12.00 643,073.493 12.00 643,152.355 12.00 643,183.780 12.00 643,221.444 12.00 643, 301.368 12.00 643, 391.944 12.00 643,416.482 12.00 643,486.100 12.00 643,571.943 12.00 643,614.593 12.00 V. Sec (usft) -275.76 -185.84 -166.11 -88.55 11.24 95.47 109.30 208.23 307.76 371.39 404.32 503.14 602.72 647.31 700.35 800.02 898.52 923.14 995.18 1,094.77 1,150.11 Baker S Hughes TFace V) -87.91 90.00 89.72 88.00 87.81 87.66 -90.00 -90.00 -89.99 -89.98 88.50 88.50 88.55 88.65 -87.50 -87.61 -87.88 -88.25 90.00 90.32 90.73 10/2212019 1:44:12AM Page 5 COMPASS 5000.15 Build 90 10/2212019 144.' 12AM Page 6 COMPASS 5000.15 Build 90 BP by Baker BP Coil Tubing Report Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU TVD Reference: Mean Sea Level Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: PLAN J -09C Survey Calculation Method: Minimum Curvature Design: J -09C WP04 Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi TVDSS N/S ENV Northing Easting DLeg V. Sec TPace (usft) V) V) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) V) 12,200.00 91.80 129.09 8,962.78 -2,008.83 51.07 5,968,098.127 643,648.162 12.00 1,194.06 -90.00 12,300.00 91.73 117.08 8,959.69 -2,063.30 134.67 5,968,045.276 643,732.774 12.00 1,293.77 -90.17 12,400.00 91.58 105.08 8,956.80 -2,099.18 227.76 5,968,011.178 643,826.534 12.00 1,390.62 -90.54 12,455.71 91.46 98.39 8,955.32 -2,110.51 282.26 5,968,000.902 643,881.234 12.00 1,441.75 -90.89 18 12,500.00 91.46 103.71 8,954.19 -2,118.99 325.70 5,967,993.252 643,924.822 12.00 1,482.20 90.00 12,535.71 91.44 108.00 8,953.28 -2,128.74 360.03 5,967,984.161 643,959.334 12.00 1,515.92 90.14 19 12,600.00 98.69 110.66 8,947.61 -2,149.91 420.42 5,967,964.153 644,020.108 12.00 1,577.52 20.00 12,656.14 105.00 113.07 8,936.09 -2,170.34 471.39 5,967,944.699 644,071.453 12.00 1,630.99 20.24 20 12,700.00 105.00 118.51 8,924.74 -2,188.77 509.52 5,967,927.008 644,109.929 12.00 1,672.80 89.29 12,756.94 105.00 125.58 8,910.00 -2,217.94 556.11 5,967,898.739 644,157.064 12.00 1,727.69 89.08 TD at 12766.94 10/2212019 144.' 12AM Page 6 COMPASS 5000.15 Build 90 Ir BP Z p BP Coil Tubing Report Baker Hughes 'i s Company: North America - ALASKA - BP Local Coordinate Reference: Well J-09 Project: PBU TVD Reference: Mean Sea Level Site: J MD Reference: KB @ 75.02usft (J -09A / B OKB) Well: J-09 North Reference: True Wellbore: PLAN J -09C Survey Calculation Method: Minimum Curvature Design: J -09C WP04 Database: EDM R5K - Alaska PROD - ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 9,417.00 8,673.45 -1,303.38 -2,051.56 Tie -In -Point 9,455.00 8,703.20 -1,289.90 -2,070.99 KOP 9,475.00 8,718.95 -1,282.75 -2,081.02 End 9deg/100 9,515.00 8,752.99 -1,270.62 -2,098.03 4 9,735.03 8,930.93 -1,161.95 -2,076.71 5 9,882.76 8,974.12 -1,080.06 -1,965.71 6 9,901.77 8,973.29 -1,072.30 -1,948.39 End 28deg/100ft 10,041.77 8,961.09 -1,036.83 -1,814.03 8 10,220.71 8,957.15 -1,048.42 -1,636.55 9 10,420.71 8,965.62 -1,134.76 -1,457.97 10 10,700.71 8,974.76 -1,233.64 -1,200.44 11 10,820.71 8,977.56 -1,257.31 -1,083.16 12 11,085.71 8,980.79 -1,405.48 -867.58 13 11,365.71 8,981.05 -1,558.17 -637.66 14 11,645.71 8,979.18 -1,710.84 -407.73 15 11,925.71 8,972.06 -1,863.49 -177.88 16 12,155.71 8,964.18 -1,979.37 18.06 17 12,455.71 8,955.32 -2,110.51 282.26 18 12,535.71 8,953.28 -2,128.74 360.03 19 12,656.14 8,936.09 -2,170.34 471.39 20 12,756.94 8,910.00 -2,217.94 556.11 TD at 12756.94 10/22/2019 1:44:12AM Page 7 COMPASS 5000.15 Build 90 North America - ALASKA - BP PBU J-09 PLAN J -09C J -09C WP04 Anticollision Summary Report 18 October, 2019 Baker S Hughes BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-09 Mean Sea Level KB @ 75.02usft (J -09A / B OKB) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Baker S Hughes Reference J -09C WP04 4P a !�+;* GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-09 Well Error: 0.00usft Reference Wellbore PLAN J -09C Reference Design: J -09C WP04 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-09 Mean Sea Level KB @ 75.02usft (J -09A / B OKB) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Baker S Hughes Reference J -09C WP04 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,417.00 to 12,756.94usft Scan Method: Tray. Cylinder North Results Limited by: Maximum centre distance of 1472 Error Surface: Pedal Curve Survey Tool Program Date 10/18/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2: MWD - Standard (J -09A) MWD MWD - Standard 9,417.00 12,756.94 J -09C WP04 (PLAN J -09C) MWD MWD - Standard 10/18/2019 11 13:OOAM Page 2 of 4 COMPASS 5000.15 Build 90 BP p Anticollision Report Baker r. Hughes te Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-09 Well Error: 0.00usft Reference Wellbore PLAN J -09C Reference Design: J -09C WP04 Summary Site Name Offset Well - Wellbore - Design EX PR331213 PR331213 - PR331213 - PR331213 H H-27 - H -27B - H -27B HURLST HURLST-01 R ( See Audit Notes) - HURLST-01 R J J-02 - J -02A - J -02A J-02 - J -02B - J -02B J-02 - J-02BPB1 - J-02BPB1 J-06 - J-06 - J-06 J-07 - J-07 - J-07 J-07 - J -07A - J -07A J-07 - J -07B - J -07B J-07 - J -07B - J -07B WP04 J-08 - J-08 - J-08 J-08 - J -08A - J -08A J-09 - J-09 - J-09 J-09 - J -09A - J -09A J-09 - J -09B - J -09B J-09 - J-09BPB1 - J-09BPB1 J-12 - J-12 - J-12 J-13 - J-13 - J-13 J-13 - J -13A - J -13A J-14 - J-14 - J-14 J-14 - J -14A - J -14A J-16 - J-16 - J-16 J-16 - J -16A - J -16A J-16 - J -16B - J -16B J-16 - J-16BPB1 - J-16BPB1 J-20 - J-20 - J-20 J-20 - J -20A - J -20A J-20 - J -20B - J -20B J-20 - J -20C - J -20C J-20 - J -20C - J -20C WP6.0 J-20 - J-20PB1 - J-20PB1 J-23 - J-23 - J-23 J-23 - J -23A - J -23A J-27 - J-27 - J-27 J-27 - J -27A - J -27A J-27 - J -27B - J -27B JX -02 - JX -02 - JX -02 JX -02 - JX -02A - JX -02A JX -02 - JX-02PB1 - JX-02PB1 Plans: Gwydyr Development (SHL) Conch - Conch #1 - Conch #1 Horz (prelim) Q Q-04 - Q-04 - Q-04 Q-04 - Q -04A - Q -04A Q-04 - Q -04B - Q -04B 10/18/2019 11:13: OOAM Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 11, 275.00 12, 850.00 1,080.57 Well J-09 Mean Sea Level KB @ 75.02usft (J -09A / B OKB) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) Out of range Out of range 237.38 845.99 Pass - Major Risk Out of range 9,840.00 9,350.00 10,820.71 11,400.00 11,368.55 9,700.00 11,222.22 9,850.00 11,525.00 9,825.00 9,417.00 9,400.00 9,425.02 9,400.00 9,424.53 9,400.00 12,250.00 9,575.00 12,214.56 9,250.00 12,275.00 9,525.00 Page 3 of 4 COMPASS 5000.1513udd 90 Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 9,422.00 9,275.00 441.47 244.49 349.32 Pass - Major Risk 9,425.00 9,425.00 0.00 0.31 0.00 Pass-NOERRORS 10,059.47 10,450.00 198.63 9.35 189.61 Pass - Major Risk 10,058.44 10,450.00 189.60 10.41 180.35 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range 12,750.00 9,950.00 1,121.41 248.53 899.48 Pass - Major Risk 12,750.00 9,750.00 1,140.41 247.69 914.37 Pass - Major Risk 12,738.51 9,650.00 1,213.95 243.54 986.48 Pass - Major Risk 12,725.00 9,600.00 '" ' '" — 70 Pacc - Major Risk 9,840.00 9,350.00 10,820.71 11,400.00 11,368.55 9,700.00 11,222.22 9,850.00 11,525.00 9,825.00 9,417.00 9,400.00 9,425.02 9,400.00 9,424.53 9,400.00 12,250.00 9,575.00 12,214.56 9,250.00 12,275.00 9,525.00 Page 3 of 4 COMPASS 5000.1513udd 90 boom b BP p Anticollision Report Baker 8 Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-09 Project: PBU TVD Reference: Mean Sea Level Reference Site: J MD Reference: KB @ 75.02usft (J -09A / 6 OKB) Site Error: O.00usft North Reference: True Reference Well: J-09 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore PLAN J -09C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: J -09C WP04 Offset TVD Reference: Offset Datum Reference Depths are relative to KB @ 75.02usft (J-09 A/ B OKB) Coordinates are relative to: J-09 Dffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK ventral Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.10° 1600- 1200 C) 600- 12000 0 O Q iQ) 800- C U O 400- 0 0 0 Ladder Plot 2500 5000 7500 10000 -t- J-16,J-16A,J-161%? cured Depth (2500 usft/in) $ J-16,J-16BPB1,J-16BPB1 V0 3 V4 $ J-18, J -18A, J -18A VO �F J-20, J -20B, J -20B V2 -rte J-20, J -20A, J -20A V3 $ J-20, J -20C, J -20C VO ✓ $ J-20, J -20C, J-20CVVP6.0 VO $ J-20, J-20, J-20 V 1 $ .1-20,.1-20PB1,J-20PB1 VO 0 -f J-23, J-23, J-23 V1 $ J-23,J-23A,.)-23AV4 12500 15000 $ Q-04, Q-04, Q-04 V 1 �F Q-04, Q -04B, Q -04B VO $ J-15,J-15A,J-15AV1 $ J-15, J -15B, J -15B V2 $ J-15, J-15, J-15 V3 $ J-09, J-09, J-09 V1 J-09, J-09B,J-09B VO -r�- 1-09,J-09BPB1,M9BPl31 VO --t- J-09, J -09A, J -09A V2 $ J -13,J -13,J -13V3 $ J-13, J -13A, J -13A VO 10/18/2019 11:13:OOAM Page 4 of 4 COMPASS 5000.15 Build 90 I I I I _I_-_-_ I I I I I _ - - - J -_ _ _ I I I I I __ __I_ _ I I I I I I _ - - - -I - - I I _ _I-_� I I I I _ _I ---------- _ _ _I---_ I I I I I I --_-J _ I I I _I - - - - _ I I I _ _ - - -I _ _ _ _ I I I _ _ _ _I _ _ _ - _ I I I I I I _ - - - I 1 I I I - - _ _ J _ _ I I I _ J I I �.I- - - I I I I _ - _ _ _I------ - - - - I I I 1 _ I - - J - - - - - I ---------- I I - - - - -I- - I I I I I - -I- - - - - I I I I I - - - - -I- - - ------ I I I I I - - -------- I I I I I- - - - I i 2500 5000 7500 10000 -t- J-16,J-16A,J-161%? cured Depth (2500 usft/in) $ J-16,J-16BPB1,J-16BPB1 V0 3 V4 $ J-18, J -18A, J -18A VO �F J-20, J -20B, J -20B V2 -rte J-20, J -20A, J -20A V3 $ J-20, J -20C, J -20C VO ✓ $ J-20, J -20C, J-20CVVP6.0 VO $ J-20, J-20, J-20 V 1 $ .1-20,.1-20PB1,J-20PB1 VO 0 -f J-23, J-23, J-23 V1 $ J-23,J-23A,.)-23AV4 12500 15000 $ Q-04, Q-04, Q-04 V 1 �F Q-04, Q -04B, Q -04B VO $ J-15,J-15A,J-15AV1 $ J-15, J -15B, J -15B V2 $ J-15, J-15, J-15 V3 $ J-09, J-09, J-09 V1 J-09, J-09B,J-09B VO -r�- 1-09,J-09BPB1,M9BPl31 VO --t- J-09, J -09A, J -09A V2 $ J -13,J -13,J -13V3 $ J-13, J -13A, J -13A VO 10/18/2019 11:13:OOAM Page 4 of 4 COMPASS 5000.15 Build 90 Project: PBU Site: J WELL DETAILS: J-09 WELLBORE DETAILS: PLAN J -09C T MAzimuths to True North MagneticNOM:16.53- REFERENCE INFORMATION Ground Level: 40.55 Parent Wellbore: J -09A Co-ordinate (N/E) Reference: Well J-09, True North Well: J-09 Northing: 5970105.460 Tie on MD: 9417.00 Magnetic Field Strength: 57404.onT Vertical(TVD)Reference: Mean Sea Level Wellbore: PLAN J -09C Easting: 643558.670 Latittude: 70° 19' 32.897 N MWD Dip Angle: 80.91 ° Section (VS) Reference: Slot - (O.00N, 0.00E) Measured Depth Reference: KB @ 75.02usft (J -09A / B OKB) Design: J -09C WP04 MWD Date: 12/1/2019 Longitude: 148° 50' 8.927 W Model: BGGM2018 Calculation Method: Minimum Curvature SECTION DETAILS Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect 1 9417.00 38.00 304.00 8673.45 -1303.38 -2051.56 0.00 0.00 -932.96 2 9455.00 38.94 305.49 8703.20 -1289.90 -2070.99 3.47 45.18 -956.60 3 9475.00 37.14 305.49 8718.95 -1282.75 -2081.02 9.00 -180.00 -968.92 4 9515.00 25.94 305.49 8752.99 -1270.62 -2098.03 28.00 -180.00 -989.81 5 9735.03 56.00 39.82 8930.93 -1161.95 -2076.71 28.00 110.00 -1034,68 6 9882.76 90.00 64.96 8974.12 -1080.06 -1965.71 28.00 40.00 -990.72 7 9901.77 95.00 66.78 8973.29 -1072.30 -1948.39 28.00 20.00 -980.99 8 10041.77 95.00 83.65 8961.09 -1036.83 -1814.03 12.00 90.00 591.26 9 10220.7187.50 103.79 8957.15 -1048.42 -1636.55 12.00 110.00 -739.23 10 10420.71 87.72 127.81 8965.62 -1134.76 -1457.97 12.00 90.00 543.43 11 10700.71 88.65 94.21 8974.76 -1233.64 -1200.44 12.00 -89.00 -275.76 12 10820.71 88.69 108.61 8977.56 -1257.31 -1083.16 12.00 90.00 -166.11 13 11085.7189.94 140.39 8980.79 -1405.48 -867.58 12.00 88.00 95.47 14 11 365.7 1 89.95 106.79 8981.05 -1558.17 537.66 12.00 -90.00 371.39 15 11645.71 90.79 140.38 8979.18 -1710.84 -007.73 12.00 88.50 647.31 16 11925.71 92.04 106.79 8972.06 -1863.49 -177.88 12.00 -87.50 923.14 17 12155.71 91.81 134.41 8964.18 -1979.37 18.06 12.00 90.00 1150.11 18 12455.71 91.46 98.39 8955.32 -2110.51 282.26 12.00 -90.00 1441.75 19 12535.71 91.44 108.00 8953.28 -2128.74 360.03 12.00 90.00 1515.92 20 12656.14 105.00 113.07 8936.09 -2170.34 471.39 12.00 20.00 1630.99 21 12756.94 105.00 125.58 8910.00 -2217.94 556.11 12.00 90.00 1727.69 ANNOTATIONS MD TVD Annotation 9417.00 8673.45 Tie -In -Point 9455.00 8703.20 KOP 9475.00 8718.95 End 9deg/100 9515.00 8752.99 4 9735.03 8930.93 5 9882.76 8974.12 6 9901.77 8973.29 End 28deg/100ft 10041.77 8961.09 8 10220.71 8957.15 9 10420.71 8965.62 10 10700.71 8974.76 11 10820.71 8977.56 12 11085.71 8980.79 13 11365.71 8981.05 14 11645.71 8979.18 15 11925.71 8972.06 16 12155.71 8964.18 17 12455.71 8955.32 18 12535.71 8953.28 19 12656.14 8936.09 20 12756.94 8910.00 TD at 12756.94 200- -200- -00- -600- -800- c _ -�200 000- 0 _ 0��0 - t - -14jtbr 7z- -1600- 5 -1800- 0 O - -2000- .,_l= WMEn go Baker Hughes r ■ SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 101.05 6101.05 CB -GYRO -MS (J-09) CB -GYRO -MS 6206.809417.00 2: MWD - Standard (J -09A) MWD 9417.00 12756.94 J -09C WP04 (PLAN J -09C) MWD 200- -200- -00- -600- -800- c _ -�200 000- 0 _ 0��0 - t - -14jtbr 7z- -1600- 5 -1800- 0 O - -2000- .,_l= WMEn go Baker Hughes r ■ RNA aim IMI W1, w ps No ■IENME� rM EM[� \\ ■■il a , MEN �■■ ®���■ No ■■■■�►■■■ 1 ■■■■■►� PBI 4"100 Vertical Section at 125.00° (400 usft/in) Project: PBS Site: J ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - BP Interpolation Method: MID,interval: 25.00 Calculation Method: Minimum Curvature Well: J-09 941 Depth Range: 9417.00 To 12756.94 Reference: Plan: J -09C WP04 (J-09/PLAN J -09C) Error System: ISCWSA Wellbore: PLAN J -09C PLAJ-09N 6101.05 Scan Method: Tray. Cylinder North Design: WP04 6206.80 Error Surface: Pedal Curve Warning Method: Rules Based Baker Hughes 9400 9600 9800 10000 10200 10400 10600 10800 11000 11200 11400 11600 11800 12000 12200 12400 12600 12800 Measured Depth - H-22. H -27B. H -new - J-.,, In 123 VI - 118,116, J-19 V5 - J43, L23A, JQMW - 116, 1168, J-19Bw - 127. 121, J-27 V1 - 119,1164 J-1 W V2 - J-27, 128. J.29B w - 116. L1 W51. 116BP81 w - J-27, L27A, J47A W LEGEND - J .—, A42 V1 - GM, QM OOIAw - J% ,J PW, J1W2P81w - LM. J09, J09 VI - J% ,JX02A JIGO2AV1 - LW. JQW.J 8W - am, am, am VI - LW, J.WV1. J-WW61w - GW,G-dB,PD1Bw - 1W, LOW W 117 )0 )0 !00 00 @0 '00 '00 '57 SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 101.05 6101.05 CB -GYRO -MS (J-09) CB -GYRO -MS 6206.80 9417.00 2: MWD - Standard (J -09A) MWD 9417.00 12756.94 J -09C WP04 (PLAN J -09C) MWD WELL DETAILS ANTI-COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - SP b Project: PBO Ground Level: 40.55 Interpolation Method: MD, interval: 25.00 _ Site: J Calculation Method: Minimum Curvature Northing: 5970105.460 Depth Range: 9417.00 To 12756.94 Baker,.'j-,. Well: J-09 Easting: 643558.670 Reference: J-09C WP04 Error System: ISCWSA Wellbore: PLAN J-09C Lattitude: 70" 19 32.897 N Scan Method: Tray. Cylinder North Hughes Design: J-09C WP04 Longitude: tude: 148' 50' Error Surface: Pedal Curve 8.927 W Warning Method: Rules Based Depth Range: 9417.00 To 12756.94 27 0 t-rom color to mu 9417 960C QAnn Q7nr Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect 1 9417.00 38.00 304.00 8673.45 -1303.38 -2051.56 0.00 0.00 -932.96 2 9455.00 38.94 305.49 8703.20 -1289.90 -2070.99 3.47 45.18 -956.60 3 9475.00 37.14 305.49 8718.95 -1282.75 -2081.02 9.00 -180.00 -968.92 4 9515.00 25.94 305.49 8752.99 -1270.62 -2098.03 28.00 -180.00 -989.81 5 9735.03 56.00 39.82 8930.93 -1161.95 -2076.71 28.00 110.00 -1034.68 6 9882.76 90.00 64.96 8974.12 -1080.06 -1965.71 28.00 40.00 -990.72 7 9901.77 95.00 66.78 8973.29 -1072.30 -1948.39 28.00 20.00 -980.99 8 10041.77 95.00 83.65 8961.09 -1036.83 -1814.03 12.00 90.00 -891.26 9 10220.71 87.50 103.79 8957.15 -1048.42 -1636.55 12.00 110.00 -739.23 10 10420.71 87.72 127.81 8965.62 -1134.76 -1457.97 12.00 90.00 -543.43 11 10700.71 88.65 94.21 8974.76 -1233.64 -1200.44 12.00 -89.00 -275.76 12 10820.71 88.69 108.61 8977.56 -1257.31 -1083.16 12.00 90.00 -166.11 13 11085.71 89.94 140.39 8980.79 -1405.48 -867.58 12.00 88.00 95.47 14 11365.71 89.95 106.79 8981.05 -1558.17 -637.66 12.00 -90.00 371.39 15 11645.71 90.79 140.38 8979.18 -1710.84 -407.73 12.00 88.50 647.31 16 11925.71 92.04 106.79 8972.06 -1863.49 -177.88 12.00 -87.50 923.14 17 12155.71 91.81 134.41 8964.18 -1979.37 18.06 12.00 90.00 1150.11 18 12455.71 91.46 98.39 8955.32 -2110.51 282.26 12.00 -90.00 1441.75 19 12535.71 91.44 108.00 8953.28 -2128.74 360.03 12.00 90.00 1515.92 20 12656.14 105.00 113.07 8936.09 -2170.34 471.39 12.00 20.00 1630.99 21 12756.94 105.00 125.58 8910.00 -2217.94 556.11 12.00 90.00 1727.69 0 J-098 Azimuth from North [°] vs Travelling Cylinder Separation [usft] 180 Azimuth from North [°] vs Travelling Cylinder Separation [usft] 90 SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 101.05 6101.05 CB -GYRO -MS (J-09) CB -GYRO -MS 6206.80 9417.00 2: MWD- Standard (J -09A) MWD 9417.00 12756.94 J -09C WP04 (PLAN J -09C) MWD 0 J-098 Azimuth from North [°] vs Travelling Cylinder Separation [usft] 180 Azimuth from North [°] vs Travelling Cylinder Separation [usft] 90 WELL DETAILS: J-09 WELLBORE DETAILS: PLAN J -09C REFERENCE INFORMATION byProject: PBU �,J Site: J Ground Level: 40.55 Parent Wellbore. J -09A Co-ordinate (N/E) ReferenceWell J-09, True North Baker Well: J-09 Northing' 5970105,460 Tie on MD: 9417.00 Vertical (ND) Reference: Mean Sea Level Hughes Slot - (0 OON, 0.00 Section (VS) Reference. E Wellbore: PLAN Easting: 643558.670 KB @ 75.02usft (JIA I B OKB) Design: JA9C WP04 PO4 Plus 500ft MD Latittude: 70° 19' 32.897 N Measured Depth Reference: Longitude: 148° 50' 8.927 W Calculation Method. Minimum Curvature 7.. '� tr 1) ff . F,. ..�.. .tit as.'�. j Z.5 E. �:x�`%r' civ. Easting (800 usft/in) 640000 640400 640800 641200 641600 642000 642400 6428Rg8PRg43200 643600 644000 644400 644800 645200 645600 646000 646400 646800 640000 640400 640800 641200 641600 642000 642400 642800 643200 643600 644000 644400 644800 645200 645600 646000 64640V00646800 Easting (800 usft/in) Z O EB O O C N North America - ALASKA - BP PBU J J-09 PLAN J -09C J -09C WP04 Plus 500ft MD AOGCC Offset Well Report 22 October, 2019 Baker Hughes �,JbBP p Anticollision Report Baker s Hughes Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-09 Well Error: 0.00usft Reference Wellbore PLAN J -09C Reference Design: J -09C WP04 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-09 Mean Sea Level KB @ 75.02usft (J -09A / B OKB) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference J -09C WP04 Plus 500ft MD =ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum centre distance of 200 Error Surface: Pedal Curve Survey Tool Program Date 10/22/2019 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 101.05 6,101.05 CB -GYRO -MS (J-09) CB -GYRO -MS Camera based gyro multishot 6,206.80 9,417.00 2 : MWD - Standard (J -09A) MWD MWD - Standard 9,417.00 13,256.94 J -09C WP04 Plus 500ft MD (PLAN J -09C) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) EX PR331213 H HURLST J J-02 - J -02A - J -02A 3,507.37 3,575.00 3.42 J-02 - J -02B - J -02B 3,502.57 3,575.00 6.46 J-02 - J-02BPB1 - J-02BPB1 3,502.57 3,575.00 6.46 J-08 - J-08 - J-08 2,955.57 2,950.00 103.30 J-08 - J -OSA - J -OSA 2,953.79 2,950.00 103.25 J-08 - J-08PB1 - J-08PB1 2,955.57 2,950.00 103.30 J-09 - J-09 - J-09 6,422.78 6,425.00 35.24 J-09 - J -09B - J -09B 10,059.47 10,450.00 198.63 J-09 - J-09BPB1 - J-09BPB1 10,058.44 10,450.00 189.60 J-09 - PLAN J -09C - J -09C WP04 9,850.00 9,850.00 0.24 J-13 - J-13 - J-13 1,980.38 1,975.00 197.37 J-13 - J -13A- J -13A 1,982.03 1,975.00 197.40 J-15 - J-15 - J-15 3,631.63 4,050.00 131.12 J-15 - J-1 5A - J-1 5A 3,631.63 4,050.00 131.12 J-15 - J-1 5B - J-1 5B 3,631.63 4,050.00 131.12 J-20 - J-20 - J-20 970.47 975.00 32.71 J-20 - J -20A - J -20A 977.96 975.00 32.89 J-20 - J-208 - J -20B 978.51 975.00 32.91 J-20 - J -20C - J -20C 980.15 975.00 32.95 J-20 - J -20C - J -20C WP6.0 978.60 975.00 32.91 J-20 - J-20PB1 - J-20PB1 970.47 975.00 32.71 J-23 - J-23 - J-23 3,065.71 3,075.00 76.60 J-23 - J -23A - J -23A 3,074.35 3,075.00 76.91 J-27 - J -27A - J -27A 11,207.48 9,900.00 54.90 Plans: Gwydyr Development (SHL) Q 10/22/2019 2: 08 05A Page 2 of 2 COMPASS 5000.15 Build 90 Well Bighole Quick Test Sub to Otis Top of 7" Otis Distances from top of riser Excluding quick -test sub Top of Annular CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 1.1 ft —'—'—'—'—' O.Oft------—.---•— — — ----------- 4 CDR2 Rig's Drip Pan Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CIL 2-3/8" Pipe/Slips 10.1 ft et Kill Line CL 2-3/8" x 3-1/2" VBRs 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CI- of Top Swab 1 16.0 ft 4 7-1116" 5k Flange X 7" Otis Box a Hydril 7 1/16" Annular B2 B3 Swab T1 je T2 CL of Flow Cross 17.4 ft FIA CL of Master 18.8 ft LDS SLB LDS Ground Level Choke Line Test Pump Hose Depth From: Depth To: Delta 12756 12676 80 12756 9455 3301 9455 9300 155 9300 9270 30 9270 9250 20 9250 9250 0 9250 9250 0 Yield 1.17 ID OD Capacity[bbl/ft] Volume Excess Volume w/ Excess Comment Sxs Ft 2.441 0 0.0058 0.46 0.00 0.46 Shoe Track 2.2 2.60 4.25 2.875 0.0095 31.42 0.30 40.84 2-7/8 X 4-1/4 196.0 229.30 3.958 3.25 0.0050 0.77 0.00 0.77 3-1/4 X 4-1/4 3.7 4.31 3.958 3.25 0.0050 0.15 0.00 0.15 6.875 X 3-1/4 0.7 0.84 3.958 3.5 0.0033 0.07 0.00 0.07 6.875 X 3-1/4 0.3 0.37 3.958 3.5 0.0033 0.00 0.00 0.00 3.958 X 3-1/4 0.0 0.00 3.958 3.5 0.0033 0.00 0.00 0.00 3.958 X 3-1/4 0.0 0.00 Side exhaust Excess above TOL Total 2.00 2.00 46.29 bbls 9.6 11.23 9.6 11.23 222.1 sxs TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: i'Development Service _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: a O i B O - POOL: PN (,( A ®(?_, 0-1 I Check Box for Appropriate Le er / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements / Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, / composite curves for well logs run must be submitted to the AOGCC v within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Public Commissi er� Date _CTD sidetrack. from existing production casing _Well Name: PRUDHOE BAY UNIT J -09C __Program DEV PTD#:2191480 Company BP Exploration Alaska) Inc---- - _ Initial Class/Type DEV /PEND_ GeoArea 890 Unit 11650 On/Off Shore On Administration 1 Permit fee attached_ _ _ _ NA_ NA_ 2 Lease number appropriate_ Yes Yes �3 Unique well name and number Yes Yes 4 Well located in a_d_efined_pool_ - Yes Yes 5 Well located proper distance from drilling unit boundary - - - . - Yes Yes 6 Well located proper distance from other wells_ - - Yes Yes - - - 7 Sufficient acreage available in drilling unit - Yes 8 If_deviated, is_we_llbore plat -included -- Yes Directional plan view _& wellbore profile included, no land -plat. 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order_ Yes Appr Date 12 Permit can be issued without administrative_approval Yes DLB 10/28/2019 13 Can permit be approved before 15 -day. wait_ - -Yes . 14 Well located within area and -strata authorized by Injection Order # (put_ 10# in comments)_(For_ NA_ 15 All wells -within -1/4 mile -area -of review identified (For service well only)- - NA_ -- --- ----- 16 Pre -produced injector: duration -of pre production less than 3 months_ (For service well only) NA_ 117 Nonconven, gas conforms to AS to - - NA_ 18 Conductor string_ provided - - - - NA_ CTD sidetrack_ from existing production casing_ - - - - Engineering 19 Surface casing protects all known USDW- Well bore seg ❑ Annular Disposal ❑ 35 Permit can be issued w/o hydrogen_ sulfide measures- - - - - - - - - - - - - - - - - - _N_o_ J -Pad wells are-H2S-bearing. _H2_S_measures are required. Geology 36 Data -presented on- potential overpressure zones - - - - - - - Yes Appr Date 37 Seismic_analysis_ of shallow gas -zones_ NA DLB 10/28/2019 38 Seabed condition survey -(if off -shore) - -NA_ - - - I39 Contact name/phone for Weekly. progress reports_[exploratory only] NA_ Geologic Engineering Commissioner: Date: Commissioner:Date r� Public Commissi er� Date _CTD sidetrack. from existing production casing CMT vol_ adequate to circulate -on conductor & surf _csg . NA. CTD sidetrack from existing production casing_ . - - - - - . - - - - 21 CMT_vol adequate to tie -in -long string to surf csg_ NA_ CTD sidetrack from existing production casing_ - - - - - 22 _CMT will coverall knownpro_ductive horizons- ---- --- Yes Production_liner, inner annulus and existing production casing, is fully cemented ------ 23 _Casing designs adequate for C,_T_, B 8_ permafrost_ Yes 24 Adequate -tankage -or reserve pit Yes CDR2 has adequate pits and -good truck support - - - . 25 If. a_re-drill_, has_a 1.0-403 for abandonment been approved _ _ - Yes 26 Adequate wellbore separation proposed Yes - - - all wells pass BP separation criteria except J-27A_which is abandoned- - - 27 If_diverter required, does it meet_ regulations_ - - - Yes Appr Date 128 Drilling fluid program schematic_& equip list adequate_ - - Yes all fluids overbalanced to P ore pressure MGR 10/30/2019 29 BOPEs,_do they meet regulation Yes 5M 4 ram CTD stack 30 BOPE_press rating appropriate; test to -(put psig in comments)_ - - - - - - Yes 5000 psi stack will be pressure -tested to 3500 psi_ 31 Choke -manifold complies w/API RP -53 (May 84)_ - - - - - - - - - - . - - - - . Yes 32 Work will occur without operation shutdown Yes CDR2 is in_continuous-ongoing_oper_ations - - - - - - - 33 Is presence_ of H2S gas_ probable - - - - NoJ pad_is not an H2S pad_ 34 Mechanical -condition of wells within AOR verified (_For_ service well only) NA_ - This well -is a development well. 35 Permit can be issued w/o hydrogen_ sulfide measures- - - - - - - - - - - - - - - - - - _N_o_ J -Pad wells are-H2S-bearing. _H2_S_measures are required. Geology 36 Data -presented on- potential overpressure zones - - - - - - - Yes Appr Date 37 Seismic_analysis_ of shallow gas -zones_ NA DLB 10/28/2019 38 Seabed condition survey -(if off -shore) - -NA_ - - - I39 Contact name/phone for Weekly. progress reports_[exploratory only] NA_ Geologic Engineering Commissioner: Date: Commissioner:Date r� Public Commissi er� Date j ^ L 0( 0 l/ l p