Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-156Operator Name:2. Development Exploratory Service Permit to Drill Number:219-156 6.50-029-20969-05-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13758 13535 9015 10027 None 13535 8300 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" x 30" 33 - 113 33 - 113 Surface 2646 13-3/8" 32 - 2678 32 - 2678 5380 2670 Intermediate 8901 9-5/8" 30 - 8931 30 - 7551 6870 4760 Liner 1460 7" 8774 - 10234 7429 - 8435 7240 5410 Liner 203 4-1/2" 10067 - 10270 8325 - 8459 8430 7500 Perforation Depth: Measured depth: 11450 - 13604 feet True vertical depth:9036 - 8998 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 28 - 10083 28 - 8336 10027 8300Packers and SSSV (type, measured and true vertical depth) Liner 3625 10133 - 13758 8369 - 8958 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 95350075327 20912334 850 24685 452 618 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brian Glasheen Brian.Glasheen@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5277 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil Gas Exploratory Development Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments:(required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Co pies of Logs and Surveys Run true vertical measured8958 Sundry Number or N/A if C.O. Exempt: N/A Junk Packer Printed and Electronic Fracture Stimulation Data Operations shutdown Change Approved Program N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number): ADL 0028281 PBU J-17E 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-1/4" x 2-7/8" Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.05.09 10:46:29 -05'00' Stan Golis (880) 4-1/2" Baker S3 Packer No SSSV Installed By Meredith Guhl at 9:48 am, May 10, 2021 SFD 5/10/2021RBDMS HEW 5/10/2021DSR-5/10/21MGR27JUL2021 ACTIVITY DATE SUMMARY 4/27/2021 CTU#6 1.75" Coiled Tubing. Job Objective: Drift / Flag. Set 2.22" CIBP. MIRU CTU6. Make up Drift BHA and RIH. ***Job Continued on WSR 4/28/21*** 4/28/2021 CTU#6 1.75" Coiled Tubing. Job Objective: Drift / Flag. Set 2.22" CIBP. Continue RIH with nozzle drift BHA. Tag polar choke at 13,565.5' CTMD, PUH 33.1' and flag pipe at plug setting depth. Corrected EOP = 13,527.26'. POOH w/drift BHA. MU NS 2-7/8" CIBP BHA. RIH w/NS 2.10" CIBP, pull up to flag in up stroke. Set CIBP at 13,527.26' + 7.76' (EOP to COE) = 13,535' MD. POOH. On surface w/BHA, recovered 3/8" ball. RDMO CTU6. ***Job Completed, Well Flowing On Departure*** Daily Report of Well Operations PBU J-17E Date: 4/9/2020 Transmittal Number: 93740-J-17E BPXA WELL DATA TRANSMITTAL Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 Digital zip files for the well log packages listed below are being provided to you via SharePoint. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com. SW Name Log Date Company Description Format J-17E 3/25/2020 Baker Hughes Reservoir Performance Monitor Zip File Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com Thank you, Mer Merion Kendall SIM Specialist ----------------------------------------------------------------------------------------------- BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK ----------------------------------------------------------------------------------------------- AOGCC https://bp365.sharepoint.com/sites/BPtoAOGCCElectronicPermittingandReporting/ DNR https://drop.state.ak.us/drop/ Received by the AOGCC on 04/09/2020 PTD: 2191560 E-set: 32473 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-20969-05-00Well Name/No. PRUDHOE BAY UNIT J-17ECompletion Status1-OILCompletion Date1/2/2020Permit to Drill2191560Operator BP Exploration (Alaska) Inc.MD13758TVD8958Current Status1-OIL4/1/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:MWD/GR/RESNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC2/7/20209016 13758 Electronic Data Set, Filename: J-17E_LWD_FINAL_FIELD_COMPOSITE_26DEC2019_BHI_CTK.las32026EDDigital DataC2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_MD_FINAL_FIELD_BHI_CTK.cgm32026EDDigital DataC2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_TVDSS_FINAL_FIELD_BHI_CTK.cgm32026EDDigital DataC2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_MD_FINAL_FIELD_BHI_CTK.pdf32026EDDigital DataC2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_TVDSS_FINAL_FIELD_BHI_CTK.pdf32026EDDigital DataC2/7/2020 Electronic File: J-17E Final Field Survey.csv32026EDDigital DataC2/7/2020 Electronic File: J-17E Final Field Survey.xlsx32026EDDigital DataC2/7/2020 Electronic File: J-17E Final Surveys.pdf32026EDDigital DataC2/7/2020 Electronic File: J-17E Final Surveys.txt32026EDDigital DataC2/7/2020 Electronic File: J-17E_25_tapescan_BHI_CTK.txt32026EDDigital DataC2/7/2020 Electronic File: J-17E_5_tapescan_BHI_CTK.txt32026EDDigital DataC2/7/2020 Electronic File: J-17E_output.tap32026EDDigital DataC2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_MD_FINAL_FIELD_BHI_CTK.tif32026EDDigital DataWednesday, April 1, 2020AOGCCPage 1 of 2J-,17E_LWD_FINAL_FIELD_COMPOSITE_26DEC__ _2019_BHI_CTK.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-20969-05-00Well Name/No. PRUDHOE BAY UNIT J-17ECompletion Status1-OILCompletion Date1/2/2020Permit to Drill2191560Operator BP Exploration (Alaska) Inc.MD13758TVD8958Current Status1-OIL4/1/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:1/2/2020Release Date:11/22/2019C2/7/2020 Electronic File: J-17E_GR_Res_26DEC2019_TVDSS_FINAL_FIELD_BHI_CTK.tif32026EDDigital Data0 0 2191560 PRUDHOE BAY UNIT J-17E LOG HEADERS32026LogLog Header ScansWednesday, April 1, 2020AOGCCPage 2 of 2M.Guhl4/1/2020 Winston, Hugh E (CED) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, March 5, 2020 4:39 PM To: AOGCC Reporting (CED sponsored) Subject: POP PBU J -17E / PTD # 219-156 Hello, Please reference the following well: Well Name: PBU J -17E Permit #: .-2-4� 2 0 — t 5_G API #: Date of Test: 3/2/2020 Type of Test: IPT (Initial Production Test) Choke Size: 95 Choke Unit: Production Method: Flowing Duration (Hours Tested): 10 Top Reference (Top Perf MD): 11450' Bottom Reference (Bottom Perf MD): 13604' Tubing Flowing (Pressure): 1560 Casing Pressure: 400 Total Test Rate (O, G, W): 340 / 8555 / 122 24 -Hour Rate (O, G, W): 817 / 20531 / 293 Gravity (Oil, API): N/A GOR (Gas -Oil Ratio): 25132 This well began Production on Method of Operations on this date: February 23, 2020 Baker 5�1 PRINT DISTRIBUTION LIST Hughes FINAL COMPANY BP Exploration Alaska Inc. WELL NAME J -17E (las, dlis, PDF, META, FIELD Prudhoe Bay Unit LOGS COUNTY PRUDHOE BAY (Compass) BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a)bhge.com 219156 32026 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anch, AK 99508 or GANCPDC@bp365.onmicrosoft.com to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 26, 2019 TODAYS DATE February 6. 2020 Revision STATUS Final Replacement: No Details: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 ' ExxonMobil Upstream Oil & Gas, US Conventional Attn: TDC Transaction ID: JV-2019-USONSHOR-288 22777 Springwoods Village Parkway N2.2A.332 Spring, Texas 77389 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Rev. Requested by: FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES J# OF COPIES P,OGCC 5 DNR - Division of Oil & Gas *** 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 1 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. .Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: 0 1 4 1 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil 0,Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 ElWINJ ❑ WAG 11WDSPL ❑ No. of Completions: One Development ® Exploratory ElGINJ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Aband.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 1/2/2020 219-156 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 12/18/2019 50-029-20969-05-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 12/25/2019 PBU J -17E - 9 Ref Elevations KB 69.80 17. Field/Pool(s): Surface: 801' FNL, 1806' FEL, Sec. 09, T11 N, R13E, UM Top of Productive Interval: 1909' FNL, 2977' FWL, Sec. 10, T11 N, R13E, UM GL 39.10 . BF 39.75 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 2928' FNL, 920' FWL, Sec. 10, T11 N, R13E, UM 13743',' 8962' ADL 028281 41b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 642547 ' y- 5970534 Zone - ASP 4 13758'/ 8958' . 85-24 TPI: x- 647353 y- 5969518 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth: x- 645318 y- 5968460 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 10270'/ 8459' " 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD / GR / RES 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" x 30" 33' 113' 33' 113' 36" 8 cu yds Concrete 13-3/8" 72# L-80 32' 2678' 32' 2678' 17-1/2" 3856 cu ft Arctic Set III 8, II 9-5/8" 47# L-80 30' 8931' 30' 7551' 12-1/4" 2360 cu ft Class'G', 132 cu ft Permafrost 7" 26# L-80 8774' 10234' 7429' 8435' 8-1/2" 348 cu ft Class'G' 4-1/2" 12.6# L-80 10067' 10270' 8325' 8459' 6-1/8" 337 cu ft Class'G' 3-1/2"x3-1/4" x2-7/8" 9.3#/6.6# /6.5# L-80 10133' 13758' 8369' 8958' 4-1/4" 190 sx Class'G' 24. Open to production or injection? Yes Q No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom, Perforation GRADE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number, Date Perfd): 4-1/2" 12.6# 13Cr80 10083' 10027'/ 8300' 2" Gun Diameter, 6 spf 1/2/2020 11450'- 11800' 9036' - 9034' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12250'- 12520' 9039'- 9031' Was hydraulic fracturing used during completion? Yes El No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed nformation 12720'- 12780' 9031' - 9030' -c-"O PLETION 12860' - 13195' 9031'- 9032' 13244'- 13465' 9033' - 9027' �G1'1 13594' - 13604' 9001' - 8998' 1 / % / 7 DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED -----=F-=i-- VERIFIED 2500' Freeze Protect w/ 38 Bbls Diesel, 3 Bbls Meth 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Test Period -111� Flow Tubing Casino Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravitv - API (corn): Press 24 Hour Rate -.00. Form 10-407 Revised 5/2017 -CONTINUED ON PAGE 2 Submit ORIGINAL only RBDMS-6� JAN 3 0 2020. Z S: �U 28. CORE DATA Conventional Core(s) Yes ❑ No Q Sidewall Cores Yes ❑ No R If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 10713' 8794 separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Shublik 10294' 8475' Sadlerochit - Zone 413 10405' 8558' CGL - Zone 3 10630' 8733' Base of CGL - Zone 2 10713' 8794' Zone 1 B 11168' 9023' Zone 2 (Invert) 13594' 9001' Formation at total depth: Zone 2 (From Base) 13594' 9001' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph Contact Name: Ciolkosz, Ryan R Authorized Title: SI eciali Contact Email: Ryan.Ciolkosz@bp.com Authorized Signature. Date: 1 Contact Phone: +1 907 564 5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only TREE = WELLHEAD = McEVOY ACTUATOR= OKB ELEV = 76.98' REF ELEV = 69.80' BF. ELEV = 39.75' 20" CON —E 110' KOP = 3000' Max Angle = 106" @ 13609' Datum MD = 10828' Datum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" 2685' 9-5/8" X 7" BKR C-2 ZXP LTP 8774' w! 11.6' TIEBK SLV, ID = 6.30" 9-5/8" X 7" BKR HMC LNR HGR, ID WHIPSTOCK (09/2705) 8952' 9-5/8" CSG, 47#, L-80, ID = 8.681" —[::Z8931 Minimum ID = 2.31" @ 10136' 2-718"X NIP IN LTP w/ PTSA 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, 10083' 0152 bpf, ID = 3.958" TOP OF 3-1/2'X 3-1/4' X 2-7/8" LNR 1--1 10133' 7" LNR, 26#, L-80 BTC -M, .0383 bpf, D = 6.276" 3-12" LNR, 9.3#, L-80 STL, .0087 bpf, D = 2.992" 4-12" BKR PKR WHIPSTOCK w/2 RA PIP TAGS AT 10279' (1125/19) 4-12" LNR, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" 1 10234' 10261' 10270' —10270' 3-1/4" LNR, 6.6#, L-80 TCII, .0079 bpf, ID = 2.850" 1--� 10421' J 1 7 E SAFETY NOTES: WELL ANGLE > " 70 @ 11100'- MAX DLS: 21.1"@ 10770.""'4-1/2" CHROME TBG— I L 1 2218' 4-1/2" HES X NIP, ID = 3.813" PBTD 13743' - 2-7/8" LNR, 6.5#, L -B0 STL, .0058 bpf, ID = 2.441" I 13758' 2584' 1--19-5/8" DV PKR 3T MD PERFORATION SUMMARY I DEV I TYPE I REF LOG: MWD LOG ON ILATCHIPORTI ANGLE AT TOP PERF: 96" @ 11450' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/S z DATE SQZ 2- 6 11450-11800 O 01/0220 3 2' 6 12250 -12520 O 01/0220 DMY 2" 6 12720 - 12780 O 01/02/20 8620 2" 6 12860 -13195 O 01/02/20 RK 2" 6 13244 -13465 O 01/0220 8240 2" 6 13594 -13604 O 01 /0220 0 J 1 7 E SAFETY NOTES: WELL ANGLE > " 70 @ 11100'- MAX DLS: 21.1"@ 10770.""'4-1/2" CHROME TBG— I L 1 2218' 4-1/2" HES X NIP, ID = 3.813" PBTD 13743' - 2-7/8" LNR, 6.5#, L -B0 STL, .0058 bpf, ID = 2.441" I 13758' 2584' 1--19-5/8" DV PKR 3T MD I TVD I DEV I TYPE I VLV ILATCHIPORTI 7" X 4-1/2" BKR S-3 PKR, D = 3.875" DATE 4 3235 3227 15 MMG DMY RK 0 1121/19 3 6368 5608 45 MMG DMY RK 0 1121/19 2 8620 7308 37 MMG DMY RK 0 10/10/05 1 9936 8240 41 KBG2 DMY BK 0 10/10/05 MILLOUT WINDOW (J -17C) 8931' DATE REV BY 10006' 4-12" HES X NIP, ID = 3.813" 10027' JMD 7" X 4-1/2" BKR S-3 PKR, D = 3.875" 10050' 4-1/2" HES XNIP, D = 3.813" 10067' FINAL ODE APPROVAL —17"X 5" BKR ZXP LTP w/11' TIEBACK, ID=4.407- =4.40"10070' 10070- 4-1/2" HES XN NP, MILLED TO 3.80" (03/05/13) 10083" 4-12" WLEG, ID = 3.958" 10084' 7" X 5" 8KR LNR HGR, ID = 4.40" 10091' S" X 4-12" XO, ID = 3.958" 10126' 4-12" KB BKR LTP w/ PTSA (01/2120) 10133' 3.70 DEPLOYMENT SLV, ID = 3.00" 10136' 2-7/8"XNIP, ID = 2.31" 10159'3-1 /2" X NIP, ID = 2.813" 10261'-13-12" MILLOUT WINDOW (J -17E) 10270' -10277' 10421' j--� 3-3/16" X 2-7/8" XO, ID = 2.377" DATE REV BY COMMENTS DATE REV BY COMMENTS 07/18/83 AUDI 3 INITIAL COMPLETION 01/0720 JMD DRLG HO CORRECTIONS 1026/99 JLH CTD SIDETRACK (J47A) 012820 NS/JMD FINAL ODE APPROVAL 0121/02 NORDIC 1 CTD SIDETRACK (J47B) 012920 LG/JMD ADDED LTP w/ PTSA & X NP (0121/21 10/11/05 N2ES SIDETRACK (J47C) 0322/13 NORDIC 1 CTD SIDETRACK (J -17D) 01/0320 N-CDR2 ICM SIDETRACK (J -17E) PRUDHOE BAY UNIT WELL: J -17E PERMIT No: 219-156 I) API No: 50-029-20969-05 SEC 9, T11 N, R13E, 801' FNL & 1806' FEL BP Exploration (Alaska) North America - ALASKA - BP Operation Summary Report Page 1 of 16 Common Well Name J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12,00 OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/16/2019 15:30 16:30 1.00 RIGID P PRE RELEASE RIG FROM J -09C. 16:30 18:00 1.50 RIGID P PRE MOVE RIG OFF J -09C, MOVE AROUND PAD TO J -17E 18:00 22:30 4.50 RIGU P PRE PJSM, VERIFY PRESSURES ON WELL. VERIFY ALL VALVES CLOSED, SPOT SUB AS CLOSE AS WE CAN WITH TRUCKS, RU STOMPER AND MOVE SUB IN PLACE MOVE PITS IN PLACE. ***RIG ACCEPTED AT 22:30** 22:30 00:00 1.50 RIGU P PRE PJSM, BEGIN RU CHECKLISTS 12/17/2019 0000 0400 4.00 RIGU P PRE RIG UP CHECKLISTS. OPEN TREE UP FOR THERMAL EXPANSION. MONITOR LTT MASTER AND SWAB. GOOD TEST. NIPPLE DOWN TREE CAP. NIPPLE UP BOPE. RU INNER REEL IRON. STAB INJECTOR, SERVICE VALVES, TORQUE TREE BOLTS 04:00 10:00 6.00 RIGU P PRE FILL REEL FORWARD WITH FRESH WATER. LINE UP TO REVERSE CIRCULATE. REVERSE CIRCULATE, CABLE IS HEARD MOVING. CUT BACK 300' OF CT FOR 1.98% SLACK. INSTALL CT CONNECTOR, PULL TEST TO 50K. MAKE UP INJECTOR TO WELL, PUMP FORWARD. 1000 13:30 3.50 RIGU P PRE INSTALL BHI CABLE HEAD WITH NO FLOATS. ELECTRICAL TEST ON CABLE HEAD, GOOD. GREASE VALVES. FLUID PACK LINES. PREP FOR BOP TEST. 1330 21 45 825 BOPSUR P PRE SHELL TEST BOPS TO 4700 PSI, GOOD./ TEST BOPS AS PER BP AND AOGCC REG"S. TEST WITNESS IS WAIVED BYAOGCC INSPECTOR LOU LAUBENSTEIN. TEST 1: PRESSURE BULKHEAD IS SEEN LEAKING, MOVE ON TO TEST 2 AND TIGHTEN PACKING. TEST 2: BLIND / SHEARS, R1, BL1A, B1, B4 - PASS TEST 3: ANNULAR (2-3/8"), TIW #1, B3, B2, BL1 - PASS TEST 4: UPPER 2-3/8" PIPE / SLIPS, TIW #2, BL2, R2, T2, C15 - PASS TEST 5: C16, T1, C11 - FAIL VALVE C3 IS LEAKING PAST THE STEM. CHANGE IT OUT. RE -TEST 5: PASS TEST 6: VARIABLES (2 2/8"), C7, C9, C10, TV2 TEST 7: LOWER 2 3/8" PIPE SLIPS, C5, C6, C8, TV1-PASS TEST 8: CHOKE A. CHOKE C -PASS ACCUMULATOR DRAW DOWN TEST -PASS TEST 9:ANNULAR (3 1/2"), C1 , C4 - PASS TEST 10: VARIABLES (3 1/2") C2, C3 - PASS TEST 1: IRV, (C9, C10 BACKWARDS) AND STRIPPER - PASS Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 2 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- (hr) -- - (usft) 21:45 - 23:30 1.75 BOPSUR P I PRE BOP TEST COMPLETED RD TEST EQUIPMENT SWAP OUT LUBRICATORS STRAP STACK MEASUREMENTS INSTALL BHI FLOATS 23:30 - 00:00 0.50 BOPSUR P PRE PRESSURE TEST PT LUBRICATOR TO 4000 PSI 'HOLD PRE SPUD MEETING WITH JEFF WARD'S CREW. 'HOLD FIRE / EVACUATION DRILL WTH JEFF WARD'S CREW. 12/18/2019 08:00 10:00 2.00 STWHIP P 10,271.00 WEXIT 'LOG GR FROM 9050'. CORRECT -34'. RIH, LIGHT TAG AT 10270'. FINISH CIRCULATING MUD AROUND. RETURNS CLEAN, PURGE CT RISER. AFTER MUD TO SURFACE BRING RETURNS TO PITS. SHUT DOWN FLOW CHECK WELL 10 MIN AND _ CLOSE EDC, GOOD. 00:00 01:00 1.00 BOPSUR P PRE PT UQC, COIL CONNECTOR AND BHI FLOATS GOOD PT 01:00 02:30 1.50 STWHIP—P WEXIT 'WELL OPS FLUID PACK MPL WITH METH TO OPEN UP TO THE WELLAND FILL THE WELL TO FLOW CHECK -1 BBL TO FILL WELL. -FLOW CHECK GOOD -DISPLACE COIL WITH 5 BBLS OF METH AND AND 50 BBLS OF HEATED 1% KCL -PURGE LUBRICATORS WHILE DISPLACING COIL -FLOWCHECK FOR 10 MINUTES STATIC 02:30 03:30 1.00 STWHIP P 10,271.00 WEXIT MAKE UP 3.80" MILLING BHA #1 HOLD PJSM WITH CREW MILL 3.80" GO / 3.79" NO GO / STRING MILL 3.79" GO / 3.78" NO GO - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES r- INJECTOR ON: 0300 HRS 0330 06.00 2.50 STWHIP P 10,271.00 WEXIT RIH WITH 3.80" MILLING BHA#1 RATE: 0.50 BPM IN, 0.95 BPM OUT. CIRC PRESSURE: 106 PSI PUMPING HEATED SLICK 1% KCL TAKING RETURNS TO TIGER TANK 'OBSERVE DROP IN FLUID DENSITY ALONG WITH A OUT RATE INCREASE, DISCUSS WITH WELL SUPERINTENDENT AND HOLD 1 FOR 1 RETURNS WITH THE CHOKE. 06:00 0700 1.00 STWHIP P 10,271.00 WEXIT TIE-IN DEPTH FROM 10040'. CORRECT +3' RIH, LIGHT TAG AT 10305'. WELL RECORDS INDICATE WHIPSTOCK WAS SETAT 10271'. REVIEW TIE-IN WITH GEO. PICK UP AND REPEAT TIE-IN LOG. CIRCULATE KCL WATER THEN DRILLING MUD. PICK UP TO 9050' TO VERIFY FIRST TIE-IN. 07:00 08.00 1.00 T STWHIP P 10,271.00 WEXIT PICK UP TO LOGGING DEPTH. SHUT DOWN PUMP AND SHUT IN WELL, VAC OUT TIGER TANK GETTING FULL. Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 3 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 18:15 8.25 STWHIP P 10,275.70 WEXIT i MILL WINDOW FROM 10268.7'-10277' GO TO 2.86 BPM AND EASE DOWN TO START WINDOW. 2 STALLS GETTING STARTED THEN TIME MILLING FROM 10268'. MILL 3.8" WINDOW AS PER BTT REP FROM 10268'. MW IN / OUT 9.00 / 8.98 PPG. FLOW IN / OUT 2.84 / 2.93 BPM. TOW 10268.7 BOW 10275.7 STRING REAMER OUT OF WINDOW AT 10277' 18:15 20:30 2.25 STWHIP P 10,287.00 WEXIT MILL RATHOLE FROM 10277' TO 10287' -2.58 BPM IN / 2.58 BPM OUT '-MUD WEIGHT 8.99 PPG IN / 8.87 PPG OUT -PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. -AT TD OF RATHOLE PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. -PERFORM REAMING PASS FROM 10287' -10265' -CLEAN -PERFORM DRY DRIFT -CLEAN -PIANT FLAG AT 10287' (10168.92' EOP) -PULLABOVE WINDOW, OPEN EDC AND PERFORM FLOW CHECK -WELL IS STATIC NOTE: 10287'SAMPLE IS 20% FORMATION. 20:30 23:00 2.50 STWHIP P 10,287.00 WEXIT POOH 1-3.93 BPM IN / 3.61 BPM OUT -HOLD PJSM FOR BHA OPERATONS AND FLOW CHECK WELL -STATIC. 23:00 00:00 1.00 STWHIP P 10,287.00 WEXIT BHA HANDLE INSPECT LAST 150' OF COIL -GOOD -INJECTOR OFF AT 2315 HRS -LAY DOWN WINDOW MILLING BHA#1 -BLOW DOWN CHOKE REPLACE STRIPPER PACK OFF ON INJECTOR. MILL IS 3.79" GO, 3.78" NO-GO. NOTE: DISCOVERED ELECTRICAL WET CONNECT IN UQC BROKEN -BROKEN PIECE RECOVERED AND ELECTRICAL WET CONNECT REPLACED. NOTE: MONITORING HOLE WHILE OUT OF HOLE 12/19/2019 00 00 01 15 1.25 DRILL P 10,287.00 PROD1 BHA OPERATIONS -TEST ELECTRICAL CONNECTION ON WET CONNECT -GOOD -TEST PACK OFFS TO 250 / 3500 PSI FOR 5 MINUTES EACH - GOOD -MADE UP LATERAL DRILLING BHA#2 -INJECTOR ON AT 0100 HRS -TESTED QTS TO 3500 PSI GOOD. 0115 0330 225 DRILL P 10.287.00 PROD1 RUN IN HOLE - 0.48 BPM IN / 0.93 BPM OUT -TIE IN FROM 9120' TO 9167' CORRECTION -39' Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date. Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 03 30 1200 8.50 DRILL P 10,315.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 10287' TO 10440' FREE SPIN: 3300 PSI, RATE: 2.85 BPM IN, 2.83 BPM OUT CIRC PRESSURE: 3350 - 3550 PSI -WOB 2.K -3.5K MUD WEIGHT:8.97 PPG IN, 8.98 PPG OUT, WINDOW ECD: 10.3 PPG NOTE: LOST COMMUNICATION WITH HOT -RESET SYSTEMS AND REGAIN COMMUNICATIONS AT 10330' START APPLYING CHOKE PRESSURE TO MAINTAIN 10.45 PPG AT WINDOW. AT 10370' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. MUD WEGHT 8.99 PPG IN / 8.98 PPG OUT. RATE 2.76 / 2.82 BPM. ECD AT WINDOW IS 10.43 PPG WITH 150 PSI WHP. 12:00 13:00 1.00 DRILL P 10.440.00 PROD1 WIPER TRIP FROM 10440'. PULL THROUGH WINDOWAND SWAP FROM GEN TO HIGHLINE POWER, NO ISSUES. RUN BACK THROUGH WINDOW, 150R, 0 'PUMP, 20 FT/MIN NO ISSUES. RIH TO BOTTOM AND DRILL. 1300 21.45 8.75 DRILL P 10,740.00 PROW DRILL 4-1/4" LATERAL SECTION FROM 10440' TO 10740' FREE SPIN: 3350 PSI, RATE: 2.84 BPM IN, 2.88 BPM OUT CIRC PRESSURE: 3350 - 3600 PSI -WOB 2.K -3.5K MUD WEIGHT: 9.01 PPG IN, 9.02 PPG OUT, WINDOW ECD: 10.45 PPG - AT 10490' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND AT 10590' PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. 21:45 - 22:15 0.50 DRILL P 10,740 00 PROD1 WIPER TRIP - DRILLED 450', WIPE TO THE WINDOW CHASING PILLS - PU THROUGH THE WINDOW, ATTEMPT TO OPEN EDC TOOL - - --RESPONSIVE. - - 22:15 00:00 1.75 DRILL N 10,740.00 PROD1 POOH FOR EDC FAILURE - 2.13 BPM IN / 1.69 BPM OUT 12/20/2019 0000 01:00 1.00 DRILL N 10,740.00 PROD1 POOH FOR EDC FAILURE 2.13 BPM IN / 1.69 BPM OUT -JOG 500' AT SURFACE -FLOW CHECK FOR 10 MINUTES STATIC -HOLD PJ_SM FOR HA_NL_DING BHA_ 01:00 01:45 0.75 DRILL N 10,740.00 PROD1 BHA HANDLE -INSPECT LAST 150' OF COIL -GOOD -INJECTOR OFFAT 0115 HRS -LAY DOWN BHA#2 -MAKE UP BHA#3 -INJECTOR ON AT 0140 HRS -TEST QTS TO 3500 PSI -GOOD Printed 1/29/2020 10 32 16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Page 5 of 16 1 Operation Summary Report Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) i Start Date: 12/16/2019 End Date: Project: PBU Site: J — - -- Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) �(usft) — - 01:45 04:15 2.50 DRILL N 10,740.00 PROD1 RUN IN HOLE 3.31 BPM IN / 3.90 BPM OUT -TIE IN AT 9120' CORRECTION -38' 04:15 - 04:45 0.50 DRILL P 0445 - 11:30 6.75 DRILL P 11 30 - 1930 8.00 19 30 - 0000 4.50 DRILL P DRILL P Printed 1/29/2020 10 32 16A **All dephts reported in Drillers Depths** -RIH TO 10240' -CLOSE EDC 10,740.00 PROD1 RUN IN HOLE -ORIENT 150° ROHS -PASS THROUGH WINDOW -CLEAN - 0.56 BPM IN / 0.65 BPM OUT 10,740.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 10740' TO 10910' FREE SPIN: 3180 PSI, I - RATE: 2.89 BPM IN, 2.90 BPM OUT CIRC PRESSURE: 3200- 3500 PSI -WOB 2.K -3.5K MUD WEIGHT: 9.01 PPG IN, 9.02 PPG OUT, WINDOW ECD: 10.45 PPG AT 10840' PUMP 5 BBLS LO / HI VIS SWEEPS. START ADDING BLACK PRODUCTS TO MUD AT 10837'. AT 10890' PULL 150' WIPER, CLEAN PASS UP AND DOWN. 11,179.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 10910' TO 11179' FREE SPIN: 3200 PSI, RATE: 2.95 BPM IN, 2.92 BPM OUT CIRC PRESSURE: 3200- 3550 PSI -WOB 2.K -3.5K - MUD WEIGHT: 9.01 PPG IN, 9.02 PPG OUT, WINDOW ECD: 10.46 PPG WITH 120 PSI WHIP. -AT 10890' AND 11 040'PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. AT 11 050'PUMP 5 BBLS LO / HI VIS SWEEPS AROUND AT 11 050'PUMP 5 BBLS LO ! HI VIS SWEEPS 11,179.00 PROD1 WIPER TRIP - DRILLED 450', WIPE TO THE WINDOW CHASING 10 BBL LO/HI VIS SWEEP -PUMP ADDITIONAL 10 BBL LO/HI VIS SWEEP TIMED TO BE OUT OF PIPE WHILE JETTING THE TRAY - PU THROUGH THE WINDOW, -BRING PUMPS UP TO 3.5 BPM -JET WHIPSTOCK TRAY -CHASE SWEEP TO 9090 TIE IN AT 9090'-9115' CORRECTION +3' -NOTE OBSERVE 25% INCREASE IN CUTTINGS AT SWEEP BACK FROM ABOVE WINDOW CONTINUE TO CIRCULATE NOT CLEANED UP AFTER 2 BOTTOMS UP, PUMP ADDITIONAL 10 BBL LO/ HI VIS SWEEP AND CHASE THROUGH TANGENT SECTION TO 4250' PUMPING AT 3.5 - 4 BPM. MAINTAING AT 10.5 ECD AT WINDOW. CUTTINGS CLEAR UP AT SHAKER AT 5500' CONTINUE WIPER THROUGH 4250' -RIH -TIE IN FROM 9090 Printed 1/29/2020 10 32 16A **All dephts reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 6 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:00AM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 12/21/2019 100:00 01:00 1.00 DRILL P 11,179.00 PROD1 WIPERTRIP -TIE IN FROM 9090' TO 9120' CORRECTION -4' -RIH CLOSE EDC -ORIENT TO 150° R AND RUN THROUGH WINDOW -JORPS SURVEY AT 10562' 01 00 09:00 8.00 DRILL P 11,292.00 PROD1 DRIL1-4-1/4" LATERAL SECTION FROM 11179' TO 11460' FREE SPIN: 3150 PSI, RATE: 2.89 BPM IN, 2.86 BPM OUT CIRC PRESSURE: 3200- 3550 PSI -WOB 2.K -3.5K MUD WEIGHT: 9.00 PPG IN, 9.03 PPG OUT, 'WINDOW ECD: 10.51 PPG - AT 11450' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. 0900 1400 5.00 DRILL P 11,292.00 PROD1 'DR I LL 4-1/4" LATERAL SECTION FROM 11460' TO 11650' FREE SPIN: 3200 PSI, RATE: 2.89 BPM IN, 2.87 BPM OUT CIRC PRESSURE: 3200-3550 PSI -WOB 2.K -3.5K MUD WEIGHT: 9.06 PPG IN, 9.08 PPG OUT, WINDOW ECD: 10.5 - 10.6 PPG AT 11500' PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. AFTER 11515WEIGHT TRANSFER GETTING DIFFICULT NEAR BOTTOM. FREQUEN PICKUPS, SOME HEAVY. I - AT 11630' START NEW MUD DOWN THE CT. 14:00 20:15 6.25 DRILL P 11,650.00 PROD1 WIPER TRIP TO WINDOWAFTER NEW MUD REACHES BIT. -PERFORM 1 00'JOG BELOW WINDOW. -JET WHIPSTOCK TRAY AT MAX RATE HOLDING ECDS AT 10.5 -PULL UP THROUGH TANGENT SECTION TO 4000', KEEP 10.5 PPG ECD AT WINDOW. -RIH -TIE IN FROM 9090' TO 9128' -RIH -CLOSE EDC AND RUN THROUGH WINDOW -CLEAN RIH 20:15 0000 3.75 DRILL P 11,292.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 11650' TO 11783' FREE SPIN: 2775 PSI, RATE: 2.89 BPM IN, 2.86 BPM OUT CIRC PRESSURE: 3050-3350 PSI -WOB 2.K -3.5K - MUD WEIGHT: 8.76 PPG IN, 8.78 PPG OUT, WINDOW ECD: 10.4 -10.6 PPG Printed 1/29/2020 10:32:16AM `"All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 7 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft)-- 12/22/2019 00:00 09:00 9.00 DRILL P 11,934.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 11783' TO 12040' FREE SPIN: 2913 PSI, 1- RATE: 2.89 BPM IN, 2.86 BPM OUT - CIRC PRESSURE: 3050- 3350 PSI -WOB 2.K -3.5K MUD WEIGHT: 8.76 PPG IN, 8.78 PPG OUT, WINDOW ECD: 10.4 - 10.6 PPG -150' WIPER TRIP AT 11800' -150' WIPER TRIP AT 11885' -150' WIPER TRIP AT 11932' NOTE: INCREASE LUBES TO 4% HAVING ISSUES WITH WEIGHT TRANSFER _ AT 12030' PUMP 5 BBLS LO / HI VIS SWEEPS. 09:00 10:15 1.25 DRILL P 11,934.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 12040' TO 12099' FREE SPIN: 2950 PSI, RATE: 2.80 BPM IN, 2.74 BPM OUT CIRC PRESSURE: 3000- 3300 PSI -WOB 2.K -3.5K MUD WEIGHT: 8.84 PPG IN, 8.89 PPG OUT, _ WINDOW ECD: 10.4 - 10.6 PPG 10:15 15:00 4.75 DRILL P 12,099.00 PROD1 POOH FOR BIT AND AGITATOR. DYNAMIC FLOW CHECK ON BOTTOM IS GOOD. 1 00'JOG BELOW WINDOW. PULL THROUGH WINDOWAND OPEN EDC. JET WHIPSTOCK TRAY. PUMP 10 BBLS LO -VIS FOLLOWED BY 9.8# MUD FROM THE WINDOW. 15:00 15:30 0.50 DRILL P 12,099.00 PROD1 AT SURFACE, 10 MIN FLOW CHECK IS GOOD. OPEN CT RISER, INSPECT LAST 70 FT OF CT. NO FLAT SPOTS SEEN. UD BHA, BIT IS 1-2. INJECTOR OFF AT 15:30. 15.30 16.00 0.50 DRILL P 12,099.00 PROD1 FUNCTION TEST BOPS. 16:00 16:30 0.50 DRILL P PROD1 M/U BHA #4. INJECTOR ON AT 16:15. RIH, TEST AGITATOR AT 1600' WITH 9.8# MUD. COMES ON AT 2.7 BPM. 16:30 20:45 4.25 DRILL P 12,099.00 PROD1 RIH -1 BPM IN / 1.4 BPM OUT -SWAP TO 8.8 PPG QUICK DRILL N AT 6000' TIE IN FROM 9090' TO 9155' CORRECTION -35 -RIH TO 10270 AND DISPLACE WELL TO 8.8 PPG QUICK DRILL N -CLOSE EDC -RUN THROUGH WINDOW CLEAN -RIH HOLDING WINDOW ECD: 10.4 -10.6 PPG 20.45 00.00 3.25 DRILL P 12,165 00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 12099' TO 12165' FREE SPIN: 3400 PSI, RATE: 2.87 BPM IN, 2.80 BPM OUT CIRC PRESSURE: 3450- 3600 PSI -WOB 2.K -3.5K - MUD WEIGHT: 8.96 PPG IN,.8.95 PPG OUT, WINDOW ECD: 10.4 -10.6 PPG Printed 1/29/2020 10.32.16AM "All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 12/23/2019 00.00 09 00 9.00 DRILL P 12,355.00 PRO61 DRILL 4-1/4" LATERAL SECTION FROM 12165' TO 12550' FREE SPIN: 3384 PSI, RATE: 2.82 BPM IN, 2.72 BPM OUT CIRC PRESSURE: 3450-3800 PSI -WOB 2.K -3.5K MUD WEIGHT: 8.83 PPG IN,.8.96 PPG OUT, WINDOW ECD: 10.4 - 10.6 PPG -150' WIPER TRIP AT 12250' - PUMP 5 BBLS LO / HI VIS SWEEPS AROUND TO PREP FOR LONG WIPER TRIP. - 09:00 16.30 750 DRILL P 12,355.00 PROD1 LONG WIPER TRIP FROM 12550'. FREE SPIN: 3590 PSI, RATE: 3.02 BPM IN, 2.84 BPM OUT CIRC PRESSURE: 3450- 3700 PSI 1 00'JOG BELOW WINDOW. PULL THROUGH WINDOWAND OPEN EDC. JET WHIPSTOCK TRAY, PICK UP PUMP 4.3 BPM / 4000 PSI. KEEP 10.5# ECD ON WELL. PULL UP TO 4000' FOR WIPER. TIE-IN DEPTH AT 9100' 16 30 18:00 1.50 DRILL P 12,606.00 PROD1 'DRILL 4-1/4" LATERAL SECTION FROM 12550' TO 12606' FREE SPIN: 3450 PSI, RATE: 2.85 BPM IN, 2.84 BPM OUT CIRC PRESSURE: 3450- 3900 PSI -WOB 2.K - 4K MUD WEIGHT: 8.93 PPG IN,.8.97 PPG OUT, WINDOW ECD: 10.4 -10.6 PPG 18:00 20:30 2.50 DRILL N 12,606.00 PROD1 STUCK PIPE OPS - DRILLED TO 12606 WENT TO PU AND PULLING HEAVY -START MIXING SPACERS -SHUT DOWN PUMP TRAPPING 10.5 ECD AT THE WINDOWALLOW WELL TO RELAX, PULL 2X TO 90K WITH NO MOVEMENT ONLINE WITH SPACERS AND MINERAL OIL 19:4113 BBLS OF MIN OIL OUT, SHUT DOWN PUMP AND ALLOW TO SOAK, PULLED FREE AFTER 8 MIN, CIRC OUT MIN OIL & SPACER 20:30 00 00 3.50 DRILL P 12,723.00 PROD1 DRILL 4-1/4" LATERAL SECTION FROM 12606' TO 12723' FREE SPIN: 3540 PSI, RATE: 2.85 BPM IN, 2.84 BPM OUT CIRC PRESSURE: 3500- 3900 PSI -WOB 2.K - 4K MUD WEIGHT: 8.96 PPG IN,.8.93 PPG OUT, _ WINDOW ECD: 10.4 - 10.6 PPG 12/24/2019 00:00 03:00 3.00 DRILL P 12,844.00 I PROD1 DRILL 4-1/4" LATERAL SECTION FROM 12729' T012844' FREE SPIN: 3740 PSI, RATE: 2.89 BPM IN, 2.86 BPM OUT CIRC PRESSURE: 3775-3900 PSI -WOB 2.K - 4K MUD WEIGHT: 8.96 PPG IN,.8.93 PPG OUT, WINDOW ECD: 10.46 PPG -150' WIPER AT 12733' Printed 1/29/2020 10.32.16AM "All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: J-17 Page 9 of 16 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 71D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - - (hr) - — - - (usft) 03:00 - 04:45 1.75 DRILL N 12,844.00 PROD1 STUCK PIPE OPS - DRILLED TO 12844' WENT TO PU AND PULLING HEAVY -START MIXING SPACERS -SHUT DOWN PUMP TRAPPING 10.5 ECD AT THE WINDOW ALLOW WELL TO RELAX, PULL 2X TO 90K WITH NO MOVEMENT ONLINE WITH SPACERS AND MINERAL OIL 04:10 12 BBLS OF MIN OIL OUT, PULLED FREE, CIRC OUT MIN OIL & SPACER -PUMP 10 BBL LO/HI VIS SWEEP 04:45 08:00 3.25 DRILL P 12,844.00 PROD1 LONG WIPER TRIP FROM 12884' TO 9,080' RATE: 2.9 BPM IN, 2.74 BPM OUT CIRC PRESSURE: 3600- 3800 PSI 100' JOG BELOW WINDOW. PULL THROUGH WINDOWAND OPEN EDC. JET WHIPSTOCK TRAY, PICK UP PUMP 4.3 'BPM / 4000 PSI. KEEP 10.5# ECD ON WELL. TIE-IN DEPTH AT 9100'. +9ftCORRECTION PERFORM CCL LOG -CLOSE EDC _ -PASSED THROUGH THE WINDOW CLEAN 08:00 09:30 1.50 DRILL P 12,844.00 PROW RIH TO 12,884'. -TAKE JORPS SURVEY AT 12,007' MUD WEIGHT: 8.96 PPG IN,.8.93 PPG OUT, WINDOW ECD: 10.4 PPG -BEGIN MUD SWAP TO NEW MUD SYSTEM. 09:30 10:55 1.42 DRILL P 12,915.00 PROD1 DRILL TO 12,915' FREE SPIN: 3659 PSI RATE: 2.9 BPM IN, 2.9 BPM OUT CIRC PRESSURE ON BOTTOM: 3860 PSI WOB 2.K - 4K MUD WEIGHT: 8.96 PPG IN,.8.93 PPG OUT, WINDOW ECD: 10.4 PPG -BEGIN MUD SWAP TO NEW MUD SYSTEM. 10:55 13:20 2.42 DRILL N 12,915.00 PROW DIFFERENTIALLY STUCK -PUMP 15 BBLS KCL, 20 BBLS LVT, 15 BBLS KCL. -CIRCULATE LVT DOWN CT AND PUMP 8 BBLS OUT THE BIT -PU TO 73K LBS AND HOLD -POP'D FREE AT 12:20 *ONLY 10 BBLS OF NEW MUD PUMPED DOWN THE CT PRIOR TO GETTING STUCK -RESUME MUD DISPLACEMENT AND PULL UP HOLE TO 12,650' -REDUCE ECD AT THE WINDOW TO 10.3 PPG DOWN FROM 10.4. -CIRCULATE SPACERS AND LVT OUT OF THE HOLE Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Page 10 of 16 Operation Summary Report Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 13:20 - 15:15 1.92 DRILL P 13,002.00 PROD1 DRILL TO 13,002' COMPLETE MUD SWAP. WORK ON RAISING LSRV ON NEW MUD FROM 42,000 TARGETING Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths" 60,000. NO BLACK PRODUCTS IN NEW MUD, WILLADD THEM ON THE RIG WHEN THE MUD WARMS UP. FREE SPIN: 3200 PSI RATE: 2.78 BPM IN, 2.78 BPM OUT CIRC PRESSURE ON BOTTOM: 3400 PSI -WOB 2.K - 4K MUD WEIGHT: 8.77 PPG IN,.8.77 PPG OUT, WINDOW ECD: 10.3 PPG -STICKY WHILE DRILLING. HAVING TO PU AFTER DRILLING 5-10' AS WEIGHT DRILLS OFF. 15 15 1725 2.17 DRILL N 13,002.00 PROD1 DIFFERENTIALLY STUCK PUMP 15 BBLS KCL, 20 BBLS LVT, 15 BBLS 'KCL. -CIRCULATE LVT DOWN CTAND PUMP 8 BBLS OUT THE BIT '-PU TO 71 K LBS AND HOLD -POP'D FREE AT 16:24 -CIRCULATE SPACERS AND LVT OUT OF THE HOLE 17:25 00:00 _ 6.58 DRILL P 13,300.00 PROD1 DRILL TO 13,300' FREE SPIN: 3250 PSI RATE: 2.83 BPM IN, 2.83 BPM OUT CIRC PRESSURE ON BOTTOM: 3380 PSI -WOB 2.K MUD WEIGHT: 8.77 PPG IN,.8.81 PPG OUT, WINDOW ECD: 10.3 PPG -STICKY WHILE DRILLING. HAVING TO PU AFTER DRILLING 5-10' AS WEIGHT DRILLS —- + OFF. — -- -- 12/25/2019 0000 0500 5.00 DRILL P 13,300.00 PROD1 LONG WIPER TRIP FROM 13300'. FREE SPIN: 3590 PSI, RATE: 2.85 BPM IN, 2.7 BPM OUT CIRC PRESSURE: 3400 PSI -PUMP 1OX10 BBL LOW/HI VIS SWEEP TO BE AT BIT AFTER GETTING THROUGH WINDOW. 100' JOG BELOW WINDOW. PULL THROUGH WINDOWAND OPEN EDC. JET WHIPSTOCK TRAY, PICK UP PUMP 4.0 BPM / 3470 PSI. KEEP 10.3# ECD ON WELL. PULL UP TO 4200' FOR WIPER. NOTE: SAND CUTTINGS DECREASED AT 7000', A FEW LARGER PEICES 1/4' TO 1/2" OF SHALE WERE OBSERVED AT 5000' ON WIPER _ TRIP 0500 08.25 3.42 DRILL P 13,300.00 PROD1 -TIE IN, -6' CORRECTION -CLOSE EDC -PU WT 50KIPS -ORIENT 150R, RIH THROUGH WINDOW CLEAN Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 11 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date Project: PBU Site: J Rig Name/No.: CDR -2 Spud Datelrime: 1/3/2002 12:00:00AM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 08:25 11:00 2.58 DRILL P 13,420.00 PROD1 DRILL -PU WT 56K -FREE SPIN 3419 PSI -2.90 BPM IN / 2.82 OUT I -MIX AND PUMP 25 BBL, 2 PPB BEAD PILL. BEADS EXITED THE BIT AT 09:00 13,313'. SMOOTH CONSISTANT ROP -DRILLING IMPROVEMENT WHEN BEADS EXITED THE BIT. WITH THE USE OF BEAD PILLS ABLE TO STAY ON BOTTOM DRILLING FOR 15'. WITHOUT BEADS WEIGHT DRILLS OFF REQUIRING PU EVERY +/- 5 FT WITH BEADS IN THE OH READING MORE AXIALAND LATERAL VIBRATION FROM THE AGITATOR TOOL THAN WITHOUT BEADS -MAINTAINING 10.3 PPG ECD AT THE WINDOW -PUMP BEAD PILLAT 11:06,13,421' -SOME PU WTS 10-15K OVER 11 00 11 12 0.20 DRILL P 13,420.00 PROD1 SHORT WIPER TO 13,368' 1112 14:30 3.30DRILL P 13,536.00 PROD1 DRILL -PU WT 62K -FREE SPIN 3419 PSI -2.90 BPM IN / 2.82 OUT -MIX AND PUMP 25 BBL, 2 PPB BEAD PILL. BEADS EXITED THE BITAT 09:00 13,513'. -MAINTAINING 10.3 PPG ECD AT THE WINDOW -BUILDING INCLINATION FOR TOE UP TRAJECTORY -3646 PSI FREE SPIN -2.87 BPM IN / 2.83 OUT -3820 PSI ON BTM, 1.8K WOB 1430 1446 0.27 DRILL P 13,536.00 PROD1 WIPER TRIP, 150' 1446 2200 7.23 DRILL P T 13,750.00 PROD1 DRILL TO UNCORRECTED TD OF 13750' -PU WT 56K -13,546' PU 12K OVER -FREE SPIN 3539 PSI -2.87 BPM IN / 2.89 OUT -PUMP BEAD PILLS AS NEEDED -PUMP SWEEPS AS NEEDED -PUMP 10X10 LO/HI VIS SWEEP JUST PRIOR TO TD 22:00 0000 2.00 DRILL P 13,750.00 PROD1 CONDITION WELLBORE FOR LINER - RATE: 2.8 BPM IN, 2.59 BPM OUT. CIRC PRESSURE: 3600 PSI - MUD WEIGHT: 8.87 PPG IN, 8.91 PPG OUT,WINDOW ECD: 10.3-10.6 PPG -POOH WITH SWEEP AT BIT -REDUCE RATE TO 0.5 BPM THROUGH ALL (SHALES —PUMP 10X10 LO/HI VIS SWEEP TO BE AT ECD ONCE THROUGH WINDOW -ORIENT 150° R AND PULL THROUGH WINDOW CLEAN AT 0.4 BPM -NOTE OBSERVE SLIGHT PACK PACK OFFS TRYING TO GET BACK TO BOTTOM FOR SWEEP AT 13650 AND TAKING WEIGHT GOING DOWN, DECIDE TO CONTINUE PULLING OUT OF HOLE TO CLEAN HOLE ABOVE. Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 12 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/26/2019 00:00 06:00 6.00 DRILL P 13,750.00 PROD1 CONDITION WELLBORE FOR LINER - RATE: 3.5 BPM IN, 2.59 BPM OUT. CIRC INCREASING RATE TO 4 BPM AS ECDS ALLOW. PRESSURE: 3600 PSI - MUD WEIGHT: 8.87 PPG IN, 8.91 PPG OUT,WINDOW ECD: 10.3-10.6 PPG -OPEN EDC -JET WINDOW WITH 1OX10 LO/HI VIS SWEEP AT EDC -PUMP AN ADDITIONAL 5X5 LO/HI VIS SWEEP AT EDC AT 7000' STILL SEEING A GOOD AMOUNT SAND CUTTINGS AT SHAKER. -PULL UP HOLE TO 5500 CHASING SWEEP, RETURNS ARE CLEAN -RUN BACK IN HOLE 3.68 BPM IN, 4.04 BPM OUT. -TIE IN FROM 9085'-9120' CORRECTION 4 -RIH -CLOSE EDC -PUMP 10X10 LO/HI VIS SWEEP TIMED TO BE AT BIT AT TD -RUN THROUGH WINDOW WITH NO PUMPS CLEAN -RUN IN HOLE THROUGH OPEN HOLE, RATE: 0.47 BPM IN, 0.53 BPM OUT 06:00 1245 675 DRILL P 13,750.00 PROD1 -RIH AND TAG TD AT 13,758' CORRECTED DEPTH -POOH 2.91 BPM IN / 2.78 OUT -POOH TO 80', JOG IN HOLE TO 356', PULL UP AND TAG UP 12:45 1715 4.50 DRILL P 13,750.00 PROD1 -RIH TO TD WITHOUT ISSUE -HOLE IN GOOD CONDITION 17:15 1815 1.00 DRILL P 13,750.00 PROD1 -PUMP LO VIS / HI VIS SWEEP AND CIRCULATE OUT OF THE HOLE WHILE RECIPROCATING PIPE -PUMP LINER RUNNING PILL WITH 1.5 PPB ALPINE BEADS 18:15 1900 0.75 DRILL P 13,750.00 PROD1 POOH -PUMP RATE 0.70 BPM IN / 0.50 BPM OUT -LAYING IN LINER RUNNING PILL 19:00 23:00 4.00 DRILL N 13,750.00 PROD1 PINHOLE -HEAR SOUND WHILE PULLING OOH,STOP PULLING OUT OF HOLE INVESTIGATE AND SEE FLUID COMING FROM COILAT INJECTOR GOOSENECKAT 12130' BIT DEPTH. -SHUT DOWN PUMPS. -PULL COIL BACK TO REELAND DISCOVER A +/- 1/4" PINHOLE ON REEL -NOTIFY WELLS SUPERINTENDENT, AND DISCUSS PLAN FORWARD WITH ETLAND WELLS MANAGER. -COVER PINHOLE WITH WRAPS OF COILAND CONTINUE TO POOH MAINTAINING A 10 PPG ECD UTILIZING THE MPD LINE. -PULL THROUGH REMAINDER OF OPEN HOLE AND WINDOW CLEAN. -POOH FROM WINDOW -FLOW CHECK WELL AT SURFACE LOSING 1 BPH -HOLD PJSM FOR LAYING DOWN BHA #4 Printed 1/29/2020 10:32:16AM **All dephts reported in Drillers Depths"' North America - ALASKA - BP Operation Summary Report Page 13 of 16 Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: ----- Project: PBU —-- Site: J -- -- Rig Name/No.: CDR -2 Spud DatelTime: 1/3/2002 12:00,00AM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 23:00 - 00:00 1.00 DRILL N 13,750.00 PROD1 BHA HANDLE BREAK INJECTOR AT 11:12 -LAY DOWN BHA BIT GRADED 2 -1 -BT -N -X -1 -NO -TD 12/27/2019 00:00 - 05:00 5.00 DRILL N 13,750.00 PROD1 REEL SWAP -INSTALL NOZZLE ON COIL AND MAKE UP 05.00 - 21 15 16.25 INJECTOR TO WELL -RIG UP TO DISPLACE TO FRESH WATER I -THAW OUT VAC TRUCK LINE TO SUCK WATER OUT OF BOMBAY DOOR. DISPLACE REEL TO FRESH WATER -BLOW DOWN REEL WITH RIG AIR -BIG COMPRESSOR. NOTE: HOLDING A 9.8 PPG EMW WITH THE MPD LINE WHEN NOT CIRCULATING IN OTHER AREAS. NOTE: HAVE PEAK AND BP SAFETY OUT TO RIG SITE TO LOOK AT JOB. NOTE: WIND IS CURRENTLY TO HIGH TO LOAD REEL ONTO TRAILER DUE TO CRANE LIMITATION. DRILL P 13,750.00 PROD1 CONTINUE INJECTOR/ REEL SWAP OPERATIONS i-PJSM. REVIEW PROCEDURE FOR UNSTABBING CT AND DISCUSS HAZARDS -REMOVE BHI CHECK VALVES, CUT OFF CTC -INSTALL GRAPPLE CONNECTOR AND !,TUGGER LINE -UNSTAB CT, POSITION REEL FOR LIFT, AND SECURE REEL. SECURE CT TO REEL. -CUT EXCESS CT -REMOVE INNER REEL IRON -REMOVE CT STRIPPER AND BRASS -DISCONNECT HYDRAULICS AND ELECTRICAL FROM INJECTOR -REMOVE GOOSE NECK FROM INJECTOR 21:15 - 0000 2.75 DRILL P LIFT PLANNING WITH PEAKAND BP LIFTING AUTHORITY -REVIEWED LIFT WEIGHTS VS. CRANE DERATING FOR COLD TEMPERATURES AND WIND CONDITIONS. PEAK SUBMITTED LIFT PLAN TO BP. GOOD TO PROCEED WITH INJECTOR BLIND LIFT. - CATAGORY II LIFT PLAN APPROVED BY BP JOHN GREEN. -ORGANIZE AND MOBILIZE PEAK CRANE NOTE: HOLDING A 9.8 PPG EMW WITH THE MPD LINE NOTE: PUT IN NOTICE FOR A BOPE TEST FOR 12/28/2019 13,750.00 PROD1 CRANE OPERATIONS -HOLD LIFT MEETING FOR CATAGORY 2 LIFT WITH PEAK AND NABORS FOR REPLACEMENT OF INJECTOR. -OFF LOAD CRANE AND SPOT. REMOVE OLD GOOSE NECK FROM RIG -REMOVE OLD INJECTOR FROM RIG NOTE: HOLDING A 9.8 PPG EMW WITH THE MPD LINE Printed 1/29/2020 10.32:16AM **All dephts reported in Drillers Depths'" North America - ALASKA - BP Page 14 of 16 Operation Summary Report Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Daterrime: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/28/2019 .00:00 04:00 4.00 DRILL P 13,750.00 PROD1 CRANE OPERATIONS -HOLD LIFT MEETING FOR CATAGORY 2 LIFT WITH PEAKAND NABORS FOR REPLACEMENT OF INJECTOR. -CLEAN INJECTOR CART -AFTER MEETING IT WAS RELAYED THE MINIMUM LIFT TEMPERATURE OF -35° F HAD 'BEEN EXCEEDED. DISCUSSED WITH HSE AND CRANE SUPERVISOR AND WENT THROUGH THE BP PROCEDURE FOR EQUIPMENT OPERATIONS IN EXTREME TEMPERATURES ASSESMENT WITH ALL INVOLVED. -LIFT NEW INJECTOR ONTO RIG � 'LIFT NEW SE NE K ONT R 04.00 - 00:00 20.00 GOO C O IG AND INSTALL ONTO INJECTOR -NOTE: HOLDING A 9.8 PPG EMW WITH THE MPD LINE -NOTE: CRANE OPERATIONS FOR REEL SWAP SUSPENDED DUE WEIGHT OF REEL AND DERATING OF CRANE DUE TO COLD CONDITIONS BY PEAK. ASK PEAK TO I � INVESTIGATE WHETHER A BIGGER CRANE IS AVAILABLE AND IF ITS DERATED LOAD RATING WOULD HANDLE THE REEL SWAP -PEAK WILL START SWAP OUT OF CRANES AT 0600 HRS. TO FACILITATE THE LIFT. DRILL P 13,750.00 PROD1 PREP FOR 2 5/8" COIL CLEAN RIG FLOOR TO ELIMINATE SLIPPING b7 ling 08.00 - 09 30 1.50 DRILL HAZARDS BUILD 2 5/8" TEST JOINT -LOAD 2 5/8" GRIPPER BLOCKS ONTO RIG -NOTE: HOLDING A 9.8 PPG EMW WITH THE MPD LINE -HOOK UP INJECTOR TO HYDRAULIC AND ELETRICAL SYSTEMS -CHANGED OUT STRIPPER BRASS AND PACK OFFS -LEAK TIGHT TEST SWAB VALVE -CHANGE OUT UPPER AND LOWER PIPE/SLIP RAMS TO 2 5/8" -FUNCTION TEST INJECTOR -PULL TEST INJECTOR TO 80K -PJSM WITH PEAK AND NABORS FOR SWAPPING REELS -REMOVE BAD 2 3/8" REEL # 38571 -INSTALL NEW 2 5/8" REEL # 39045 CLOSE AND SECURE REEL_ DOORS P 13,750.00 PROD1 INSTALL 2 5/8" COIL i -INSTALL SADDLE CLAMPS ON REEL !-STRING COIL GRAPPLE LINE -REMOVE LIFT RIGGING FOR NEW COIL INSTALL INNER REEL IRON. -MU ELINE BULK HEAD CONNECTION P 13,750.00 PROD1 INSTALL 2 5/8" COIL -PJSM FOR STABBING CT INTO INJECTOR INSTALL GRAPPLE INTO CT AND PULL TEST -PULL CT AND STAB INTO INJECTOR Printed 1/29/2020 10.32 16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Page 15 of 16 Operation Summary Report Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:00AM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - -- (hr) (usft) 09:30 - 15:30 6.00 DRILL P 13,750.00 PROD1 PREP CT 15:30 - 21.15 21:15 - 22:30 22:30 - 23:00 575 DRILL 1.25 DRILL 0.50 DRILL 2300 - 0000 1.00 I DRILL 12/30/2019 00:00 02:00 2.00 DRILL Printed 1/29/2020 10 32 16AM **All dephts reported in Drillers Depths** -CUT BACK CT TO PREP FOR CTC -CHECK ELINE CONTINUITY, GOOD -INSTALL CTC AND PULL TEST TO 50K -INSTALL BHI UPPER QUICK CONNECT -FILL COILAT4 BPM FORWARD P 13,750.00 PROD1 BOP TEST '-SERVICE TREE AND CHOKE MANIFOLD VALVES -PERFORM BI -WEEKLY BOPE TEST PER AOGCC , BP, CRITERIA. TEST WITNESS WAIVED BYAOGCC REPADAM EARL. 7-1/16" 5K ANNULAR, BLINDS/ SHEARS, 2-5/8" PIPE/ SLIP, MUD X, 2-3/8" x 3-1/2" VARIABLE, 2-5/8" PIPE / SLIP TEST ALL GAS ALARMS AND PVT -TEST #1: IRV, PACKOFF, C9 BACKWARDS, C10 BACKWARDS PASS TEST#2: BLIND/SHEAR, R1, BL1A, B1, B4 PASS '-REMOVE INJECTOR, INSTALL TEST JOINT FOR TESTING 2-5/8" TEST #3: ANNULAR (2-5/8"), TIW#1, B3, B2, BL1 PASS TEST #4: UPPER 2-5/8" PIPE/SLIP, TIW#2, BL2, R2, T2, C15 PASS -TEST #5: C16, T1, C11 PASS TEST #6: VARIABLES (3 1/2"), C7, C9, C10, TV2 PASS -TEST #7: LOWER 2-5/8" PIPE /SLIP, C5, C6, C8, TV1 PASS TEST #8: CHOKE A, CHOKE C PASS TEST #9: C1, C4, ANNULAR (3 1/2") PASS TEST #10: C2, C3 VARIABLE (2 5/8") PASS PERFORM ACCUMULATOR DRAW DOWN TEST. _ P 13,750.00 PROD1 BOP TEST COMPLETED RD TEST EQUIPMENT SWAP OUT LUBRICATORS T _ INSTALL BHI FLOATS P 13,750.00 PROD1 PRESSURE TEST -PT BHI FLOATS TO 3850 PSI PT LUBRICATOR TO 3850 PSI P 13,750.00 PROD1 DISPLACE COIL TO 8.8 PPG QUICK DRILL N TEST MUD PUMP 1 AFTER SWAB REPLACEMENT. - P 13,750.00 PROD1 BHA HANDLE -WORK THROUGH NABORS VALVE ALLIGNMENT CHECKLIST. -BLEED OFF APPLIED WELL PRESSURE FROM HOLDING 9.8 ECD FLOW CHECK WELL FOR 10 MINUTES STATIC HOLD PJSM FOR PICKING UP BHA WHILE FLOW CHECKING -MAKE UP CLEAN OUT BHA#5 INJECTOR ON AT 0140 -LEAK TIGHT TEST QTS TO 3500 PSI Printed 1/29/2020 10 32 16AM **All dephts reported in Drillers Depths** Printed 1/29/2020 10 32 16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Page 16 of 16 Operation Summary Report Common Well Name: J-17 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/16/2019 End Date: Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUO1: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (usft) -(hr) r02:00 13:00 11.00 DRILL P 13,750.00 — PROD1 RIH -0.89 BPM IN / 1.4 BPM OUT -CALIBRATE DEPTH ENCODERS CHECK SADDLE CLAMPS ON REELAT 7400' -TIE IN AT 9090' CORRECTION -9' -STOP AND ADJUST GOOSE NECK -10,224'. CLOSE EDC -78K PU WT, 36K DOWN PUMPS OFF -RIH CLEAN TO 13560', STACKED OUTAND WORKEDTHROUGH' -RIH FROM 13560 TO 13732' TAG 3 TIMES. MATCHES WITH TD SURVEY -GR LOGGING INDICATES +20' 13:00 18:45 5.75 DRILL P 13,750.00 PROD1 POOH -LAY IN LINER RUNNING PILLTO WINDOW -LOG RA TAG CORRECTION -14 DID NOT CORRECT DEPTH -OPEN EDC -DISPLACE TO 9.8 PPG FLUID WHILE PULLING OUT OF THE HOLE -PAINT FLAGS (WHITE) 9824.06' TD AND (YELLOW) 6336.06 WINDOW (BIT DEPTH) FLOW CHECK FOR 10 MINUTES AT SURFACE -STATIC '-HOLD PJSM FOR HANDLING BHA WHILE _ FLOW CHECKING 18:45 19 30 0.75 DRILL P 13,750.00 PROD1 BHA HANDLE -INJECTOR OFF AT 1900 HRS -LAY DOWN CLEAN OUT BHA#5 **SWAP TO CON REPORT 15AAT 1930 HRS" Printed 1/29/2020 10 32 16AM **All dephts reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 1 of 5 Common Well Name: J-17 Event Type: COM- ONSHORE (CON) Start Date: 12/30/2019 End Date: 1/3/2020 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Daterrime: 1/3/2002 12:00 OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J-1 7D @69.80usft (above Mean Sea Level) - -------- – — Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _,758. 12/30/2019 � 19:30 00:00 4.50 it P CASING � 13,758.00 RUNPRD PREP TO RUN LINER. -PUMP 375' OF SLACK OUT. -INSTALL BTT SWIVEL. -PJSM FOR PUMPING 7/8" DRIFT BALL. -LAUNCH BALL 7/8" AND PUMPAROUNDAT 4.2 BPM, BALL IS HEARD ROLLING. -PREPARE SAFETY JOINTAND TEST RUN 'SAME -RIG UP TONGS AND FUNCTION TEST 12/31/2019 00:00 01:30 1.50 ,01:30 11:00 9.50 CASING P 13,758.00 RUNPRD PREP FOR LINER -CHECK LINER COUNTAND FLAGGING FOR RUN ORDER -CHECK VALVE CHECKLIST -PJS_M WITH CREW FOR RUNNING LINER. CASING P 13,758.00 RUNPRD M/U LINER AS PER APPROVED TALLY. '-ON JOINT 20 HOLD KICK WHILE TRIPPING 1100 - 1300 2.00 CASING 13:00 - 15:00 2.00 CASING DRILL WITH MICAH BUSHS CREW -WELL SECURED IN 4 MINUTES -HOLD AAR WITH CREW -LL: USE RADIO TO COMMUNICATE WITH WINCH OPERATOR, REMOVE BOWLAND SET SAFETY JOINT LOWER SO WE CAN STRIP OVER WITH INJECTOR. -LAY DOWN SAFEY JOINT AND FILL LINER -CONTINUE TO PICK UP LINER. -PICKED A TOTAL OF 110 JOINTS OF 2.875" 6.5# L-80 ST -L SOLID LINER., 5 JOINTS OF 3.25" 6.6# TCII SOLID LINER, 3 JOINTS 3.5"9.3# ST -L SOLID LINER, DEPLOYEMENT SLEEVE W/ GS PROFILE P 13,758.00 RUNPRD MU BAKER BSELRT SYSTEM -8 JOINTS OF 3.125" X 1.5" DC -MU DEPLOYMENT JOINT -LINER HANGING WEIGHT 31K -STRIP OVER AS PER NABORS PROCEDURE -INSTALL INJECTOR AND TEST QTS CONNECTION P 13,758.00 RUNPRD RIH WITH LINER TO 10,330 AT 70 FPM -0.3 BPM IN / 0.70 OUT 1400 PSI _ -FIRST FLAG -5.9 15:00 16:00 1.00 CASING P 13,758.00 RUNPRD CIRCULATE 9.8 PPG KWF OUT TO QUICKDRIL -MAX 1.5 BPM 1950 -1800 PSI -FINAL MW 9.0 PPG 16:00 23:00 7.00 CASING P 13,758.00 RUNPRD RIH WITH LINER 0.7 BPM IN 1600 PSI, 1.00 BPM 1900 PSI STARTING TO WORK LINER AT 12463' MD. PU WEIGHTS 86K TO 95K. WORKED DOWN TO 13666' MD. NO MORE MOVEMENT. - PUMP 10 BBLS KCL SPACER, 40 BBLS LVT, 10 BBLS KCL SPACER. - PUMPED 10 BBLS LVT OUT SHOE. PU TO BREAKOVER OF 95K. RIH TO A SOLID TD. RIH WEIGHT 31 K. LINER ON DEPTH. CIRCULATE SPACERS AND LVT OUT OF WELL. - PU WEIGHT 91 K. Printed 1/29/2020 10 34 46AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 2 of 5 Common Well Name: J-17 Event Type: COM- ONSHORE (CON) Start Date: 12/30/2019 End Date: 1/3/2020 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Daterrime: 1/3/2002 12:00 OOAM Rig Release: 1/3/2020 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 23:00 - 00:00 1 00 CASING P 13,758.00 RUNPRD PJSM, FOR BALL DROP LOAD AND LAUNCH 3/4" STEEL BALL SLOW RATE TO 0.88 BPM AT 45 BBLS AWAY. BALL DID NOT LAND ON VOLUME. _CONTINUE TO CIRCULATE 1/1/2020 00:00 01:30 1.50 CASING P 13,758.00 RUNPRD CONTINUE TO SURGE REEL WORK PIPE UP AND DOWN. BALL FINALLY LANDED AT 131 BBLS AWAY. (2 VOLUMES) PRESSURE UP TO 4700#. STOP. FINALLY SHEARED OUT PERFORMED 3 PICKUP RENDITIONS. 80K BREAKOVER. _ 01:30 03.30 2.00 CASING P 13,758.00 I RUNPRD CIRCULATE WELL OVER TO1%KCL 2.42 BPM IN RATE / 2.36 BPM OUT RATE 8.41 PPG IN / 9.01 PPG OUT PJSM WITH CEMENTERS. SLIP STREAM KCL TO CEMENTERS PRESSURE TEST CEMENTERS TO 4900#. GOOD TEST 03:30 06.00 2.50 CASING P _ 13,758.00 RUNPRD MIX AND PUMP 44.3 BBLS OF CEMENT: FILL LINES WITH WATER AND PRESSURE TEST TO 4900 PSI FOR 5 MINUTES CEMENT WET AT 03:48 HRS. ZERO IN MM ONCE DENSITY = 13.5 PPG LOAD 44.3 BBLS 15.3 PPG CEMENT IN REEL SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS DISPLACE CEMENT WITH 8.33 PPG EXHAUST PILL RATE: 1.53 BPM IN, 1.39 BPM OUT ZERO OUT MM WITH CEMENT AT SHOE AT 88.4 BBLS AWAY - TAKE RETURNS TO PILL PIT FOR MANUAL STRAP - SHUT DOWN PUMPS AT 108.0 BBLS AWAY 15.8 BBLS BEHIND PIPE) LAUNCH PEE WEE DARTAND LINER WIPER PLUG AS FOLLOWS: - PICK UP TO BREAKOVER +16 FT (13716' MD) PER BTT REP, EXPOSE DOGS, SET DOWN AT 13729' MD (13 FT HIGHER) - PU: 75 KLBS, SO: 10 KLBS SHIFT PEEWEE DOWN, PICK BACK UP TO 13716' MD AND SIDE EXHAUST 5 BBLS SET DOWN 10K AT 13729' MD PRESSURE UP TO 2000 PSI ON WIPER PLUG AND ZERO MM. - LINER WIPER PLUG SHEARED AT 3720 PSI (0.4 BBLS) DISPLACE LINER WIPER PLUG 21 BBLS DISPLACED AT 1.5 BPM: 1411 PSI PLUG BUMPED AT 21.0 BBLS, 3275 PSI (21.5 BBLS CALCULATED) - OPEN PUMP BLEED AND CHECK FLOATS. GOOD TEST. CLOSE PUMP BLEED PRESSURE UP TO 1500 PSI ON COIL, PICK UP AND CONFIRM PRESSURE DROP CEMENT IN PLACE: 05:53 HRS 37.00 BBLS CEMENT BEHIND PIPE. BASED Printed 1/29/2020 10:34:46AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 3 of 5 Common Well Name: J-17 Event Type: COM- ONSHORE (CON) Start Date: 12/30/2019 End Date: 1/3/2020 Project: PBU - - Site: J - Rig Name/No.: CDR -2 Spud Datelrime: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USAD0000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code ! NPT Total Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 CASING P 13,758.00 RUNPRD POHPUMPING AT4BPM /2524 -70K PUW -5 BBL OF CEMENT RETURNS -STOPPED AT 500' -FLOW CHECK WHILE PJSM FOR LD TOOLS -LD DC 12:00 - 20:00 8.00 PERFOB P 13,758.00 OTHCMP PERFORATING OPS - LOAD HES HANDING EQUIPMENT ON THE RIG PREP RIG FLOOR FOR RUNNING GUNS -WALK THROUGH GUN LAYOUT HOLD A PJSM WITH HES AND NABORS CREWS TO RUN GUNS - PROGRAM FIRING HEAD TO ACTIVATE AT 11:00AM, WE WILL BE ABLE TO LAP TESTAT 10:OOAM 14:20 MU PERF GUNS 17:15 MU CSH 19:30 MU INJECTOR PT QTS TO 3500# 20:00 00:00 4.00 PERFOB P 13,758.00 OTHCMP RIH 0.34 BPM IN RATE / 0.48 BPM OUT RATE 8.37 PPG IN / 8.41 PPG OUT -ADJUSTED GOOSE NECK ALIGNMENT. 1/2/2020 00:00 02:00 2.00 PERFOB P 13,758.00 OTHCMP RIH AND TAG PBTD AT 13728' WITH A +14' CORRECTION. PU TO BREAKOVER MULTIPLE TIMES. PU TO JUST UNDER BREAKOVER. CORRECT DEPTH TO 13742.72' PU TO SHOT DEPTH. 02:00 10:00 8.00 PERFOB N 13,758.00 OTHCMP WAITING ON CEMENT 1.10 BPM IN RATE / 1.09 BPM OUT RATE 8.39 PPG IN / 8.48 PPG OUT WORK ON GOOSENECK ALIGNMENT PREP FOR LINER LAP TEST PURGE LUBRICATOR 10:00 10:30 0.50 PERFOB P 13,758.00 OTHCMP LINER LAP TEST OPS CMT COMPRESSIVE STRENGTH IS AT 500 PSI BASED ON UCA CHART GUNS ARE ON DEPTH WITH BOTTOM SHOT AT 13604' CLOSE CHOKE AND START BRINGING PRESSURE UP TO 2400 PSI - LAP TEST FAILED, STARTED TAKING FLUID AT 2030 PSI LOOKING FOR SURFACE LEAKS BUT INJECTING AT 1.16 BPM AT 1280 PSI NOTIFY ODE AND WSUPT Printed 1/29/2020 10.34.46AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 4 of 5 Common Well Name: J-17 Event Type: COM- ONSHORE (CON) Start Date: 12/30/2019 End Date: 1/3/2020 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations — — - - (hr) - (usft) 110:30 16:00 5.50 PERFOB P 13,758.00 OTHCMP PERFORATING OPS TAG PBTD TO CONFIRM DEPTHS WITH HES REPS - PU AND PUT GUNS ON DEPTH, FIRING HEAD WILLARM IN 5 MIN TOOL IS ARMED, SET WHP AT 100 PSI, RIH BELOW FIRING DEPTH TO START MOVEMENTS FOR FIRING SEQUENCE - INCREASE WHP TO 150 PSI, START FIRING SEQUENCE MOVEMENTS POOH, GOOD INDICATION THE GUNS FIRED i AT SURFACE - WT CHANGE, LOSS OF WHP, LOSS OF OUT RATE LOST 4 BBLS BEFORE WE STARTED BUILDING WHP, HOLDING 203 PSI NOW, POOH TO TOL STOP AT TOL, LOST 8.3 BBLS PERFORM INJECTIVITY TEST, 2.0 BPM AT 1350 PSI - SLIGHT LOSSES, SHUT DOWN PUMP AND FLOW CHECK WELL GOOD NO FLOW, LOST 0.5 BBLS IN 10 MIN POOH MONITORING RETURNS FOR CO GAS 500' FROM SURFACE, SHUT DOWN PUMP AND JOG IN HOLE THE PERF GUN LENGTH ONLINE WITH PUMP AND WHILE POOH OUT DENSITY DROPPING OFF A LITTLE, SEND CO GAS OUT TO TT RETURNS CLEANED UP, BRING BACK INSIDE -STOP 50' FROM SURFACE AND FLOW CHECK WELL & PJSM FOR LD THE UPPER BHAAND CSH 16.00 23 00 700 PERFOB P 13,758.00 OTHCMP LD BHA LD UPPER BHAAND CSH PJSM WITH TCP PULL REMAINING HYDRIL. PUH TO VERIFY SHOTS FIRED. SHOTS CONFIRMED SWAP ELEVATORS LAY DOWN PERF GUNS / FIRING HEAD. RIG DOWN PERF EQUIPMENT CLEAR AND CLEAN RIG FLOOR 23:00 0000 1.00 DISPL P 13,758.00 POST PJSM WITH LRS PT LINES TO 3500# LOAD COIL WITH 47 BBLS DIESEL LOAD COIL 5 BBLS N_EET METHANOL 1/3/2020 00 00 01:30 1.50 DISPL P 13,758.00 POST BULLHEAD 38 BBLS OF 90° DIESEL 3 BBLS NEET METHANOL VALVE CREW SERVICED TREE SHUT MASTER VALVES 1&2 JET STACK Printed 1/29/2020 10.34 46AM **All depths reported in Drillers Depths** Printed 1/29/2020 10:34:46AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 5 of 5 Operation Summary Report Common Well Name: J-17 Event Type: COM- ONSHORE (CON) Start Date. 12/30/2019 End Date: 1/3/2020 Project: PBU Site: J Rig Name/No.: CDR -2 Spud Date/Time: 1/3/2002 12:00:OOAM Rig Release: 1/3/2020 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000388 Active datum: J -17D @69.80usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 01:30 13:00 11.50 RIGID P 13,758.00 POST SLACK MANAGEMENT REVERSE CIRCULATE FRESHWATER CUT 274' OF COIL (1.85% SLACK) REAM COIL FOR CTC MU AND PULL TEST CTC TO 60K, GOOD TEST - MU STINGER & NOZZLE AND PUMP SLACK FORWARD HEAD UP BHI UQC WITH NO FLOATS PT CTC AND UQC GOOD PT TO 4000 PSI BLOW DOWN SURFACE LINES BLOW DOWN COIL LTT LOWER MASTER & SWAB, GOOD PT TO 3900 PSI - CLOSE UPPER MASTER AND LTT, GOOD PT TO 3750 WELL IS SECURED, NO BOPE TREE CAP ON AND TESTED ***RIG RELEASED AT 13:00*** Printed 1/29/2020 10:34:46AM **All depths reported in Drillers Depths** Daily Report of Well Operations PBU J -17E T/I/O = 1000/0/0. Post CDR2. RD CTD Test Spool #2 and Target 90. RDMO. ***Job 1/8/2020 Incomplete*** T/I/O = 800/0/0. Post CDR2. Set 4" TWC #444 @114" w/ Lubricator 661. RD CDR Tree, RU Production Tree, Replaced stem packing in MV. PT'd against TWC 350/5000 PSI (Pass). 1/9/2020 Charted and Retained. Pulled TWC. RDMO. ***Job Complete***. MV=O, SSV/SVNW=C, T/1/0=1900/100/-10 Temp= SI LRS unit 42 Assist SL ( Load & Test LTP) ***Job 1/20/2020 continued on 01/21/2020*** ***WELL S/I ON ARRIVAL*** (CTD) R/U HES S/L UNIT 046 1/20/2020 ***CONT JOB ON 1/21/20 WSR*** ***CONT JOB FROM 1/20/20 WSR*** (CTD) BRUSH n' FLUSHED LINER @ 10,133' MD RAN LINER TOP TEST PLUG TO 10,095' SLM; LINER LAP FAILED. RAN 4-1/2" 45KB PACKER & PTSA DRIFT TO 10 096' SLM SET 4-1/2" BAKER 45KB LTP WITH PTSA @ 10,102' SLM LRS PERFORM PASSING MIT -T (see Irs log) R/D HES S/L UNIT 046 FOR RIG JOB 1/21/2020 ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED*** ***Job continued from 01/20/2020*** LRS unit 42 Assist SL (Load & Test LTP) Loaded TBG with 3 bbls 60/40 followed by 240 bbls crude. Slickline set test plug. Pumped 40 bbls crude down tbg to reach 2500 psi/TP fell off rapidly. (see log) SL reset LTP. MIT -T ***PASSED*** to 2347 psi. pumped 3.7 bbls crude to reach Max applied psi of 2500 with a target psi of 2250. 1st 15 min TBG lost 107 psi. 2nd 15 min TBG lost 37 psi, for a total of 144 1/21/2020 psi in 30 minutes. Bled back 3 bbls crude. SL in control of well @ departure.Tags hung on by North America - ALASKA - BP PBU J-17 J-1 7E 500292096905 Design: J -17E Final Survey Report 26 December, 2019 Baker S Hughes- by BP V- Final Survey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-17 Wellbore: J -17E Design: J -17E Local Coordinate Reference: Well J-17 TVD Reference: J -17D @ 69.80usft (Nordic 1) MD Reference: J -17D @ 69.80usft (Nordic 1) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-UsaAK [4267'15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site J, TR -11-13 Site Position: +N/ -S From: Map Position Uncertainty: 0.00 usft Well J-17, J-17 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore J -17E Magnetics Model Name BGGM2018 Design J -17E Audit Notes: Version: Vertical Section: Sample Date 12/1/2019 Northing: Easting: Slot Radius: Northing: Easting: Wellhead Elevation Declination 16.53 Phase: ACTUAL Depth From (TVD) +N/ -S (usft) (usft) 69.80 0.00 5,968,224.220 usft 641,155.790 usft 0.000 in 5,970,534.000 usft 642,547.000 usft 39.75 usft Dip Angle l°) 80.91 Tie On Depth: +E/ -W (usft) 0.00 Latitude: 70° 19' 14.845 N Longitude: 148° 51'20.092 W Grid Convergence: 1.08 ° Latitude: 70° 19' 37.301 N Longitude: 148° 50'38.216 W Ground Level: 39.10 usft Field Strength (nT) 57,404.10437651 10,174.20 Direction (I 240.00 12/26/2019 9:42:49AM Page 2 COMPASS 5000.15 Build 90 Survey MD BP Azi TVD by TVDSS NIS E/W Baker c� Easting Final Survey Report DLeg Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 V) Project: PBU (usft) TVD Reference: J-17D @ 69.80usft (Nordic 1) Site: J (usft) MD Reference: J-17D @ 69.80usft (Nordic 1) (usft) Well: J-17 (°/100usft) North Reference: True Wellbore: J-17E 0.00 Survey Calculation Method: Minimum Curvature Design: J-17E Database: EDM R5K - Alaska PROD - ANCP1 5,970,534.000 Survey Program Date 12/26/2019 0.00 0.00 From To 0.35 271.74 (usft) (usft) Survey (Wellbore) Tool Name Description 0.01 92.82 8,892.12 J-17 Srvy 2 GyroData (J-17) GYD-CT-CMS Gyrodata cont.casing m/s 642,546.808 8,931.00 10,174.20 J-17C Srvy 1 MWD+IFR+MS (J-17C) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 0.38 10,270.00 13,758.00 Survey #1 (J-17E) MWD MWD - Standard 123.02 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 30.05 0.00 0.00 30.05 -39.75 0.00 0.00 5,970,534.000 642,547.000 0.00 0.00 92.82 0.35 271.74 92.82 23.02 0.01 -0.19 5,970,534.003 642,546.808 0.56 0.16 192.82 0.38 257.90 192.82 123.02 -0.05 -0.82 5,970,533.930 642,546.180 0.09 0.74 292.82 0.55 258.91 292.81 223.01 -0.22 -1.62 5,970,533.753 642,545.388 0.17 1.51 392.82 0.63 240.42 392.81 323.01 -0.58 -2.57 5,970,533.372 642,544.446 0.21 2.51 492.82 0.58 214.97 492.80 423.00 -1.27 -3.33 5,970,532.671 642,543.691 0.27 3.52 592.82 0.39 196.77 592.80 523.00 -2.01 -3.72 5,970,531.923 642,543.317 0.24 4.23 692.82 0.50 157.55 692.80 623.00 -2.74 -3.65 5,970,531.196 642,543.399 0.32 4.53 792.82 0.62 129.10 792.79 722.99 -3.48 -3.07 5,970,530.463 642,544.000 0.30 4.40 892.82 0.78 114.50 892.79 822.99 -4.10 -2.03 5,970,529.859 642,545.051 0.24 3.81 992.82 0.82 103.71 992.78 922.98 -4.56 -0.71 5,970,529.432 642,546.373 0.16 2.90 1,092.82 0.90 103.09 1,092.76 1,022.96 -4.90 0.75 5,970,529.113 642,547.840 0.08 1.80 1,192.82 0.55 100.45 1,192.76 1,122.96 -5.17 1.98 5,970,528.871 642, 549.081 0.35 0.87 1,292.82 0.40 89.85 1,292.75 1,222.95 -5.25 2.80 5,970,528.801 642,549.904 0.17 0.20 1,392.82 0.24 102.96 1,392.75 1,322.95 -5.30 3.36 5,970,528.765 642,550.458 0.17 -0.26 1,492.82 0.48 324.12 1,492.75 1,422.95 -5.01 3.32 5,970,529.057 642,550.411 0.68 -0.37 1,592.82 0.91 344.76 1,592.74 1,522.94 -3.90 2.86 5,970,530.153 642,549.936 0.49 -0.53 1,692.82 0.46 346.47 1,692.74 1,622.94 -2.75 2.56 5,970,531.304 642,549.611 0.45 -0.84 1,792.82 0.20 285.35 1,792.73 1,722.93 -2.31 2.30 5,970,531.735 642,549.341 0.40 -0.84 1,892.82 0.10 325.98 1,892.73 1,822.93 -2.19 2.08 5,970,531.850 642,549.121 0.14 -0.71 12/26/2019 9:42.49AM Page 3 COMPASS 5000.15 Build 90 by BP Final Survey Report Baker Vil, RHughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-17 Wellbore: J -17E Design: J -17E Survey MD (usft) 1,992.82 2,092.82 2,192.82 2,292.82 2,392.82 2,492.82 2,592.82 2,692.82 2,792.82 2,892.82 2,992.82 3,092.82 3,192.82 3,212.82 3,232.82 3,252.82 3,272.82 3,292.82 3,312.82 3,33Z82 3,352.82 3,372.82 3,392.82 3,412.82 3,432.82 3,452.82 3,472.82 Local Co-ordinate Reference: Well J-17 ND Reference: J -17D @ 69.80usft (Nordic 1) MD Reference: J -17D @ 69.80usft (Nordic 1) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec V) (') (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 0.33 41.49 1,992.73 1,922.93 -1.90 2.22 5,970,532.140 642,549.258 0.32 -0.97 0.18 158.99 2,092.73 2,022.93 -1.83 2.47 5,970,532.214 642,549.504 0.44 -1.22 0.26 155.84 2,192.73 2,122.93 -2.19 2.62 5,970,531.863 642,549.660 0.08 -1.17 0.35 149.96 2,292.73 2,222.93 -2.66 2.86 5,970,531.397 642,549.914 0.10 -1.15 0.61 141.76 2,392.73 2,322.93 -3.34 3.35 5,970,530.724 642,550.409 0.27 -1.23 0.37 135.90 2,492.72 2,422.92 -3.99 3.90 5,970,530.084 642,550.976 0.24 -1.38 0.28 139.62 2,592.72 2,522.92 -4.41 4.28 5,970,529.674 642,551.367 0.09 -1.51 0.53 108.28 2,692.72 2,622.92 -4.74 4.88 5,970,529.354 642,551.970 0.33 -1.86 6.00 85.98 2,792.52 2,722.72 -4.52 10.54 5,970,529.683 642,557.622 5.51 -6.87 8.09 84.62 2,891.76 2,821.96 -3.49 22.76 5,970,530.941 642,569.819 2.10 -17.96 9.67 85.60 2,990.56 2,920.76 -2.19 38.14 5,970,532.537 642,585.171 1.59 -31.94 10.73 86.97 3,088.98 3,019.18 -1.05 55.81 5,970,534.009 642,602.815 1.09 -47.81 13.23 88.38 3,186.79 3,116.99 -0.24 76.55 5,970,535.218 642,623.532 2.52 -66.17 14.63 87.55 3,206.20 3,136.40 -0.06 81.36 5,970,535.482 642,628.339 7.07 -70.43 15.36 87.19 3,225.52 3,155.72 0.17 86.53 5,970,535.818 642,633.502 3.68 -75.02 16.21 87.39 3,244.77 3,174.97 0.43 91.96 5,970,536.178 642,638.931 4.26 -79.86 16.66 87.19 3,263.95 3,194.15 0.70 97.61 5,970,536.553 642,644.576 2.27 -84.89 17.26 87.47 3,283.08 3,213.28 0.97 103.44 5,970,536.936 642,650.397 3.03 -90.07 17.59 87.53 3,302.16 3,232.36 1.23 109.43 5,970,537.310 642,656.374 1.65 -95.38 18.18 87.39 3,321.19 3,251.39 1.50 115.56 5,970,537.699 642,662.504 2.96 -100.83 18.60 87.54 3,340.17 3,270.37 1.78 121.87 5,970,538.098 642,668.800 2.11 -106.43 19.27 87.42 3,359.09 3,289.29 2.07 128.35 5,970,538.506 642,675.277 3.36 -112.19 19.74 87.17 3,377.94 3,308.14 2.38 135.02 5,970,538.948 642,681.939 2.39 -118.12 20.53 87.23 3,396.72 3,326.92 2.72 141.90 5,970,539.415 642,688.807 3.95 -124.25 20.97 87.18 3,415.42 3,345.62 3.07 148.97 5,970,539.895 642,695.876 2.20 -130.55 21.53 87.50 3,434.06 3,364.26 3.40 156.21 5,970,540.369 642,703.109 2.86 -136.99 21.97 87.48 3,452.64 3,382.84 3.73 163.62 5,970,540.834 642,710.505 2.20 -143.56 12126/2019 9:42:49AM Page 4 COMPASS 5000.15 Build 90 �+*KA BP ® p"j Baker %0„ !`"' Final Survey Report Hughes 0,� 9 Company: North America - ALASKA - BP Project: PBU Site: J Well: J-17 Wellbore: J -17E Design: J -17E Survey MD (usft) 3,492.82 3,512.82 3,53Z82 3,552.82 3,572.82 3,592.82 3,612.82 3,632.82 3,652.82 3,672.82 3,692.82 3,712.82 3,732.82 3,752.82 3,772.82 3,792.82 3,812.82 3,832.82 3,852.82 3,872.82 3,892.82 3,912.82 3,932.82 3,952.82 3,972.82 3,992.82 4,012.82 Local Co-ordinate Reference: Well J-17 ND Reference: J-1 7D @ 69.80usft (Nordic 1) MD Reference: J -17D @ 69.80usft (Nordic 1) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 22.57 87.80 3,471.15 3,401.35 4.04 171.19 5,970,541.289 642,718.070 3.06 -150.27 23.04 88.23 3,489.58 3,419.78 4.31 178.94 5,970,541.705 642,725.810 2.49 -157.12 23.37 88.12 3,507.97 3,438.17 4.56 186.81 5,970,542.105 642,733.680 1.66 -164.06 23.85 88.59 3,526.29 3,456.49 4.79 194.82 5,970,542.487 642,741.680 2.58 -171.11 24.24 88.76 3,544.56 3,474.76 4.98 202.97 5,970,542.830 642,749.821 1.98 -178.26 24.65 88.89 3,562.76 3,492.96 5.14 211.24 5,970,543.157 642,758.091 2.07 -185.51 24.93 88.84 3,580.92 3,511.12 5.31 219.63 5,970,543.482 642,766.470 1.40 -192.86 25.42 89.04 3,599.02 3,529.22 5.47 228.13 5,970,543.801 642,774.971 2.49 -200.30 25.84 89.40 3,617.05 3,547.25 5.59 236.78 5,970,544.083 642,783.617 2.24 -207.85 26.55 89.52 3,635.00 3,565.20 5.67 245.61 5,970,544.334 642,792.441 3.56 -215.54 26.90 89.65 3,652.86 3,583.06 5.73 254.61 5,970,544.570 642,801.431 1.77 -223.36 27.54 89.63 3,670.65 3,600.85 5.79 263.75 5,970,544.801 642,810.576 3.20 -231.31 28.17 89.73 3,688.33 3,618.53 5.84 273.10 5,970,545.030 642,819.917 3.16 -239.43 29.02 89.88 3,705.89 3,636.09 5.88 282.67 5,970,545.245 642,829.486 4.27 -247.74 29.81 90.51 3,723.31 3,653.51 5.84 292.49 5,970,545.397 642,839.306 4.24 -256.23 30.57 90.80 3,740.60 3,670.80 5.73 302.55 5,970,545.473 642,849.363 3.87 -264.88 30.93 91.06 3,757.79 3,687.99 5.56 312.77 5,970,545.501 642,859.588 1.92 -273.65 31.32 91.21 3,774.91 3,705.11 5.36 323.11 5,970,545.493 642,869.925 1.99 -282.50 31.85 91.50 3,791.94 3,722.14 5.11 333.58 5,970,545.444 642,880.399 2.76 -291.44 32.35 91.81 3,808.89 3,739.09 4.80 344.21 5,970,545.339 642,891.026 2.63 -300.49 32.92 92.55 3,825.73 3,755.93 4.39 354.98 5,970,545.133 642,901.808 3.48 -309.62 33.33 93.00 3,842.48 3,772.68 3.86 365.90 5,970,544.811 642,912.732 2.39 -318.81 33.75 94.04 3,859.15 3,789.35 3.18 376.93 5,970,544.342 642,923.771 3.56 -328.02 34.13 94.66 3,875.74 3,805.94 2.33 388.06 5,970,543.706 642,934.919 2.57 -337.24 34.53 95.98 3,892.26 3,822.46 1.29 399.29 5,970,542.873 642,946.166 4.23 -346.44 35.02 96.54 3,908.69 3,838.89 0.04 410.63 5,970,541.845 642,957.525 2.92 -355.64 35.71 97.19 3,925.00 3,855.20 -1.34 422.12 5,970,540.679 642,969.041 3.93 -364.90 12/26/2019 9:42:49AM Page 5 COMPASS 5000.15 Build 90 by BP Final Sulvey Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Site: J Well: J-17 Wellbore: J -17E Design: J -17E Survey MD (usft) 4,032.82 4,052.82 4,072.82 4,092.82 4,112.82 4,132.82 4,152.82 4,172.82 4,192.82 4,21Z82 4,232.82 4,252.82 4,272.82 4,292.82 4.312.82 4,332.82 4,352.82 4,372.82 4,392.82 4,412.82 4,432.82 4,452.82 4,472.82 4,492.82 4,512.82 4,532.82 4,552.82 Local Co-ordinate Reference: Well J-17 ND Reference: J -17D @ 69.80usft (Nordic 1) MD Reference: J -17D @ 69.80usft (Nordic 1) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 36.20 97.46 3,941.19 3,871.39 -2.84 433.77 5,970,539.404 642,980.713 2.58 -374.24 37.11 98.33 3,957.23 3,887.43 -4.48 445.60 5,970,537.988 642,992.568 5.24 -383.66 37.99 98.36 3,973.09 3,903.29 -6.25 457.66 5,970,536.448 643,004.658 4.40 -393.22 39.55 98.12 3,988.68 3,918.88 -8.04 470.05 5,970,534.890 643,017.083 7.84 -403.06 40.47 97.99 4,004.00 3,934.20 -9.84 482.78 5,970,533.330 643,029.846 4.62 -413.18 41.51 97.81 4,019.09 3,949.29 -11.65 495.78 5,970,531.775 643,042.870 5.23 -423.53 42.28 97.89 4,033.98 3,964.18 -13.47 509.01 5,970,530.203 643,056.132 3.86 -434.08 43.06 98.64 4,048.69 3,978.89 -15.42 522.42 5,970,528.509 643,069.580 4.66 -444.72 43.87 99.91 4,063.20 3,993.40 -17.64 536.00 5,970,526.549 643,083.196 5.96 -455.37 44.24 100.54 4,077.58 4,007.78 -20.11 549.68 5,970,524.340 643,096.925 2.87 -465.99 44.64 100.76 4,091.86 4,022.06 -22.70 563.45 5,970,522.015 643,110.733 2.14 -476.61 45.00 100.78 4,106.04 4,036.24 -25.33 577.30 5,970,519.644 643,124.628 1.80 -487.29 45.31 100.85 4,120.15 4,050.35 -27.99 591.22 5,970,517.248 643,138.604 1.57 -498.02 45.34 101.03 4,134.21 4,064.41 -30.69 605.19 5,970,514.815 643,152.615 0.66 -508.76 45.28 101.27 4,148.27 4,078.47 -33.44 619.14 5,970,512.332 643,166.614 0.90 -519.47 45.09 101.46 4,162.37 4,092.57 -36.24 633.05 5,970,509.801 643,180.573 1.16 -530.12 44.82 101.71 4,176.52 4,106.72 -39.07 646.89 5,970,507.227 643,194.466 1.61 -540.69 44.82 101.94 4,190.71 4,120.91 -41.96 660.69 5,970,504.601 643,208.316 0.81 -551.19 44.78 102.08 4,204.90 4,135.10 -44.89 674.47 5,970,501.931 643,222.153 0.53 -561.66 44.78 102.25 4,219.10 4,149.30 -47.86 688.24 5,970,499.225 643,235.977 0.60 -572.11 44.53 102.60 4,233.32 4,163.52 -50.89 701.97 5,970,496.462 643,249.758 1.75 -582.48 44.62 102.79 4,247.57 4,177.77 -53.97 715.67 5,970,493.638 643,263.507 0.80 -592.80 44.34 103.04 4,261.84 4,192.04 -57.10 729.32 5,970,490.766 643,277.222 1.65 -603.06 44.38 103.13 4,276.14 4,206.34 -60.27 742.94 5,970,487.860 643,290.898 0.37 -613.27 44.39 103.29 4,290.43 4,220.63 -63.47 756.56 5,970,484.923 643,304.575 0.56 -623.47 44.46 103.24 4,304.72 4,234.92 -66.68 770.19 5,970,481.970 643,318.258 0.39 -633.66 44.44 103.27 4,318.99 4,249.19 -69.89 783.82 5,970,479.019 643,331.949 0.15 -643.87 12/26/2019 9:42:49AM Page 6 COMPASS 5000.15 Build 90 -0#100-by BP Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 Project: PBU ND Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J-1 7D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 4,572.82 44.51 103.30 4,333.26 4,263.46 -73.11 797.46 5,970,476.059 643,345.643 0.37 -654.07 4,592.82 44.46 103.21 4,347.53 4,277.73 -76.32 811.10 5,970,473.105 643,359.342 0.40 -664.27 4,612.82 44.46 103.21 4,361.81 4,292.01 -79.52 824.74 5,970,470.164 643,373.037 0.00 -674.48 4,632.82 44.40 103.26 4,376.09 4,306.29 -82.73 838.37 5,970,467.218 643,386.723 0.35 -684.68 4,652.82 44.41 103.18 4,390.38 4,320.58 -85.93 851.99 5,970,464.278 643,400.404 0.28 -694.88 4,672.82 44.45 103.20 4,404.66 4,334.86 -89.13 865.62 5,970,461.343 643,414.092 0.21 -705.09 4,692.82 44.52 103.24 4,418.93 4,349.13 -92.33 879.27 5,970,458.398 643,427.793 0.38 -715.30 4,712.82 44.70 103.24 4,433.17 4,363.37 -95.55 892.94 5,970,455.441 643,441.523 0.90 -725.53 4,732.82 44.47 103.44 4,447.41 4,377.61 -98.79 906.60 5,970,452.463 643,455.241 1.35 -735.74 4,752.82 44.48 103.70 4,461.68 4,391.88 -102.07 920.22 5,970,449.434 643,468.921 0.91 -745.90 4,772.82 44.46 103.96 4,475.96 4,406.16 -105.42 933.82 5,970,446.345 643,482.586 0.92 -756.00 4,792.82 44.50 104.20 4,490.23 4,420.43 -108.83 947.42 5,970,443.195 643,496.239 0.86 -766.07 4,812.82 44.55 104.30 4,504.48 4,434.68 -112.28 961.01 5,970,440.002 643,509.894 0.43 -776.12 4,832.82 44.63 104.28 4,518.73 4,448.93 -115.75 974.61 5,970,436.795 643,523.562 0.41 -786.17 4,852.82 44.55 104.25 4,532.97 4,463.17 -119.21 988.22 5,970,433.595 643,537.232 0.41 -796.22 4,872.82 44.65 104.27 4,547.21 4,477.41 -122.67 1,001.83 5,970,430.395 643,550.905 0.50 -806.28 4,892.82 44.68 104.14 4,561.43 4,491.63 -126.12 1,015.46 5,970,427.205 643,564.596 0.48 -816.36 4,912.82 44.72 104.10 4,575.65 4,505.85 -129.55 1,029.10 5,970,424.033 643,578.301 0.24 -826.46 4,932.82 44.73 104.19 4,589.86 4,520.06 -132.99 1,042.75 5,970,420.854 643,592.010 0.32 -836.55 4,952.82 44.69 104.22 4,604.07 4,534.27 -136.44 1,056.39 5,970,417.661 643,605.712 0.23 -846.64 4,972.82 44.58 104.51 4,618.31 4,548.51 -139.93 1,070.00 5,970,414.435 643,619.387 1.16 -856.69 4,992.82 44.46 104.38 4,632.57 4,562.77 -143.43 1,083.58 5,970,411.195 643,633.030 0.75 -866.70 5,012.82 44.31 104.25 4,646.86 4,577.06 -146.89 1,097.14 5,970,407.995 643,646.648 0.88 -876.71 5,032.82 44.22 104.37 4,661.18 4,591.38 -150.34 1,110.67 5,970,404.802 643,660.236 0.61 -886.70 5,052.82 44.23 104.40 4,675.51 4,605.71 -153.80 1,124.18 5,970,401.594 643,673.811 0.12 -896.67 5,072.82 44.05 104.21 4,689.87 4,620.07 -157.24 1,137.67 5,970,398.410 643,687.369 1.12 -906.63 5,092.82 43.76 104.25 4,704.28 4,634.48 -160.65 1,151.12 5,970,395.257 643,700.874 1.46 -916.57 12/26/2019 9:42:49AM Page 7 COMPASS 5000.15 Build 90 Survey MD BP Azi ND by N/S E/W Northing Baker DLeg Final Survey Report (usft) Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 (usft) Project: PBU ND Reference: J-1 7D @ 69.80usft (Nordic 1) (°/100usft) Site: J MD Reference: J-1 7D @ 69.80usft (Nordic 1) 104.18 Well: J-17 North Reference: True 1,164.55 Wellbore: J-17E Survey Calculation Method: Minimum Curvature -926.50 Design: J-17E Database: EDM R5K - Alaska PROD - ANCP1 4,733.12 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,112.82 43.92 104.18 4,718.70 4,648.90 -164.05 1,164.55 5,970,392.111 643,714.364 0.84 -926.50 5,132.82 43.86 104.18 4,733.12 4,663.32 -167.45 1,177.99 5,970,388.971 643,727.868 0.30 -936.44 5,152.82 43.92 104.27 4,747.53 4,677.73 -170.86 1,191.43 5,970,385.820 643,741.370 0.43 -946.38 5,172.82 43.86 104.49 4,761.94 4,692.14 -174.30 1,204.86 5,970,382.633 643,754.863 0.82 -956.29 5,192.82 43.99 104.47 4,776.35 4,706.55 -177.77 1,218.30 5,970,379.420 643,768.359 0.65 -966.19 5,212.82 43.77 104.57 4,790.76 4,720.96 -181.25 1,231.72 5,970,376.200 643,781.842 1.15 -976.07 5,232.82 43.71 104.77 4,805.21 4,735.41 -184.75 1,245.09 5,970,372.953 643,795.282 0.75 -985.91 5,252.82 43.74 104.78 4,819.67 4,749.87 -188.27 1,258.46 5,970,369.682 643,808.712 0.15 -995.72 5,272.82 43.85 104.77 4,834.10 4,764.30 -191.80 1,271.84 5,970,366.407 643,822.160 0.55 -1,005.55 5,292.82 43.97 104.75 4,848.51 4,778.71 -195.34 1,285.26 5,970,363.129 643,835.636 0.60 -1,015.40 5,312.82 44.16 104.73 4,862.88 4,793.08 -198.88 1,298.71 5,970,359.847 643,849.152 0.95 -1,025.28 5,332.82 44.40 104.86 4,877.20 4,807.40 -202.44 1,312.21 5,970,356.538 643,862.716 1.28 -1,035.18 5,352.82 44.45 104.89 4,891.48 4,821.68 -206.04 1,325.74 5,970,353.203 643,876.311 0.27 -1,045.11 5,372.82 44.56 105.05 4,905.75 4,835.95 -209.66 1,339.28 5,970,349.839 643,889.920 0.79 -1,055.02 5,392.82 44.52 105.22 4,920.00 4,850.20 -213.32 1,352.82 5,970,346.435 643,903.528 0.63 -1,064.92 5,412.82 44.55 105.37 4,934.26 4,864.46 -217.02 1,366.35 5,970,342.993 643,917.125 0.55 -1,074.79 5,432.82 44.34 105.42 4,948.54 4,878.74 -220.74 1,379.86 5,970,339.532 643,930.694 1.06 -1,084.62 5,452.82 44.32 105.47 4,962.84 4,893.04 -224.46 1,393.33 5,970,336.067 643,944.232 0.20 -1,094.43 5,472.82 44.35 105.43 4,977.15 4,907.35 -228.18 1,406.80 5,970,332.601 643,957.771 0.21 -1,104.23 5,492.82 44.57 105.62 4,991.43 4,921.63 -231.93 1,420.30 5,970,329.109 643,971.336 1.29 -1,114.05 5,512.82 44.56 105.52 5,005.67 4,935.87 -235.70 1,433.82 5,970,325.600 643,984.924 0.35 -1,123.87 5,532.82 44.59 105.50 5,019.92 4,950.12 -239.45 1,447.34 5,970,322.104 643,998.517 0.17 -1,133.71 5,552.82 44.61 105.39 5,034.16 4,964.36 -243.19 1,460.88 5,970,318.622 644,012.121 0.40 -1,143.56 5,572.82 44.87 105.42 5,048.37 4,978.57 -246.93 1,474.45 5,970,315.141 644,025.760 1.30 -1,153.44 5,592.82 45.03 105.62 5,062.52 4,992.72 -250.71 1,488.06 5,970,311.620 644,039.443 1.07 -1,163.34 5,612.82 45.18 105.76 5,076.64 5,006.84 -254.55 1,501.70 5,970,308.049 644,053.152 0.90 -1,173.24 5,632.82 45.26 106.00 5,090.73 5,020.93 -258.43 1,515.36 5,970,304.425 644,066.877 0.94 -1,183.12 12/26/2019 9:42:49AM Page 8 COMPASS 5000.15 Build 90 Survey MD Inc Azi TVD bBP N/S E/W Northing Baker p Final Survey Report (usft) Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 (usft) Project: PBU TVD Reference: J-17D @ 69.80usft (Nordic 1) (°/100usft) Site: J MD Reference: J-17D @ 69.80usft (Nordic 1) 106.24 Well: J-17 North Reference: True 1,529.01 Wellbore: J-17E Survey Calculation Method: Minimum Curvature -1,192.97 Design: J-17E Database: EDM R5K - Alaska PROD - ANCP1 5,118.88 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,652.82 45.26 106.24 5,104.80 5,035.00 -262.37 1,529.01 5,970,300.741 644,080.596 0.85 -1,192.97 5,672.82 45.28 106.78 5,118.88 5,049.08 -266.41 1,542.63 5,970,296.963 644,094.292 1.92 -1,202.75 5,692.82 45.25 107.01 5,132.96 5,063.16 -270.54 1,556.22 5,970,293.093 644,107.961 0.83 -1,212.46 5,712.82 45.37 107.17 5,147.02 5,077.22 -274.72 1,569.81 5,970,289.174 644,121.628 0.83 -1,222.14 5,732.82 45.36 107.37 5,161.07 5,091.27 -278.94 1,583.40 5,970,285.208 644,135.295 0.71 -1,231.80 5,752.82 45.44 107.48 5,175.12 5,105.32 -283.21 1,596.99 5,970,281.203 644,148.959 0.56 -1,241.43 5,772.82 45.38 107.50 5,189.16 5,119.36 -287.49 1,610.57 5,970,277.181 644,162.622 0.31 -1,251.05 5,792.82 45.54 107.62 5,203.18 5,133.38 -291.79 1,624.17 5,970,273.140 644,176.291 0.91 -1,260.67 5,812.82 45.49 107.56 5,217.20 5,147.40 -296.10 1,637.77 5,970,269.087 644,189.971 0.33 -1,270.30 5,832.82 45.61 107.69 5,231.20 5,161.40 -300.43 1,651.37 5,970,265.024 644,203.656 0.76 -1,279.92 5,852.82 45.34 108.05 5,245.23 5,175.43 -304.80 1,664.95 5,970,260.907 644,217.307 1.86 -1,289.48 5,872.82 45.44 108.22 5,259.27 5,189.47 -309.23 1,678.48 5,970,256.734 644,230.919 0.78 -1,298.99 5,892.82 45.37 108.52 5,273.32 5,203.52 -313.72 1,691.99 5,970,252.504 644,244.516 1.12 -1,308.45 5,912.82 45.40 108.72 5,287.36 5,217.56 -318.27 1,705.48 5,970,248.215 644,258.091 0.73 -1,317.86 5,932.82 45.12 109.03 5,301.44 5,231.64 -322.86 1,718.93 5,970,243.876 644,271.617 1.78 -1,327.20 5,952.82 45.15 109.36 5,315.55 5,245.75 -327.52 1,732.31 5,970,239.471 644,285.089 1.18 -1,336.47 5,972.82 44.97 109.57 5,329.68 5,259.88 -332.24 1,745.66 5,970,235.008 644,298.523 1.17 -1,345.67 5,992.82 44.93 109.86 5,343.83 5,274.03 -337.01 1,758.96 5,970,230.496 644,311.912 1.04 -1,354.80 6,012.82 44.64 109.93 5,358.03 5,288.23 -341.80 1,772.21 5,970,225.954 644,325.248 1.47 -1,363.88 6,032.82 44.88 110.00 5,372.23 5,302.43 -346.61 1,785.45 5,970,221.398 644,338.572 1.23 -1,372.94 6,052.82 45.00 110.03 5,386.39 5,316.59 -351.44 1,798.72 5,970,216.817 644,351.934 0.61 -1,382.02 6,072.82 45.26 110.07 5,400.50 5,330.70 -356.30 1,812.04 5,970,212.211 644,365.338 1.31 -1,391.12 6,092.82 45.23 110.25 5,414.58 5,344.78 -361.20 1,825.37 5,970,207.571 644,378.760 0.66 -1,400.22 6,112.82 45.38 110.30 5,428.64 5,358.84 -366.13 1,838.70 5,970,202.899 644,392.187 0.77 -1,409.30 6,132.82 45.40 110.46 5,442.69 5,372.89 -371.08 1,852.05 5,970,198.196 644,405.624 0.58 -1,418.38 6,152.82 45.44 110.32 5,456.73 5,386.93 -376.05 1,865.40 5,970,193.487 644,419.068 0.54 -1,427.46 6,172.82 45.30 110.44 5,470.78 5,400.98 -381.00 1,878.75 5,970,188.785 644,432.501 0.82 -1,436.54 12/26/2019 9:42:49AM Page 9 COMPASS 5000.15 Build 90 Survey MD Inc Azi TVD TVDSS bBP E/W Northing Easting Baker p Final Survey Report (°) Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 (usft) Project: PBU TVD Reference: J -17D @ 69.80usft (Nordic 1) (usft) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) 5,484.86 Well: J-17 North Reference: True 5,970,184.077 Wellbore: J -17E Survey Calculation Method: Minimum Curvature 6,212.82 Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 5,429.17 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 6,192.82 45.20 110.46 5,484.86 5,415.06 -385.97 1,892.06 5,970,184.077 644,445.900 0.51 -1,445.58 6,212.82 45.07 110.69 5,498.97 5,429.17 -390.95 1,905.33 5,970,179.349 644,459.263 1.04 -1,454.59 6,232.82 45.10 110.43 5,513.09 5,443.29 -395.92 1,918.59 5,970,174.628 644,472.615 0.93 -1,463.58 6,252.82 45.16 110.31 5,527.20 5,457.40 -400.86 1,931.88 5,970,169.948 644,485.993 0.52 -1,472.63 6,272.82 45.29 110.38 5,541.28 5,471.48 -405.79 1,945.19 5,970,165.266 644,499.395 0.70 -1,481.69 6,292.82 45.46 110.42 5,555.33 5,485.53 -410.75 1,958.53 5,970,160.559 644,512.828 0.86 -1,490.76 6,312.82 45.45 110.38 5,569.36 5,499.56 -415.72 1,971.89 5,970,155.845 644,526.279 0.15 -1,499.84 6,332.82 45.33 110.36 5,583.41 5,513.61 -420.68 1,985.24 5,970,151.144 644,539.717 0.60 -1,508.93 6,352.82 45.16 110.43 5,597.49 5,527.69 -425.63 1,998.55 5,970,146.449 644,553.120 0.89 -1,517.98 6,372.82 45.01 110.60 5,611.61 5,541.81 -430.59 2,011.81 5,970,141.739 644,566.476 0.96 -1,526.99 6,392.82 44.99 110.56 5,625.75 5,555.95 -435.56 2,025.05 5,970,137.020 644,579.806 0.17 -1,535.97 6,412.82 45.27 110.54 5,639.86 5,570.06 -440.54 2,038.33 5,970,132.298 644,593.170 1.40 -1,544.97 6,432.82 45.45 110.58 5,653.92 5,584.12 -445.54 2,051.65 5,970,127.555 644,606.585 0.91 -1,554.01 6,452.82 45.74 110.69 5,667.91 5,598.11 -450.57 2,065.02 5,970,122.775 644,620.049 1.50 -1,563.08 6,472.82 45.66 110.67 5,681.88 5,612.08 -455.63 2,078.41 5,970,117.976 644,633.533 0.41 -1,572.15 6,492.82 45.39 110.60 5,695.89 5,626.09 -460.66 2,091.77 5,970,113.202 644,646.981 1.37 -1,581.20 6,512.82 45.42 110.52 5,709.93 5,640.13 -465.66 2,105.10 5,970,108.455 644,660.407 0.32 -1,590.24 6,532.82 45.70 110.68 5,723.94 5,654.14 -470.68 2,118.47 5,970,103.686 644,673.866 1.51 -1,599.31 6,552.82 45.89 110.66 5,737.88 5,668.08 -475.74 2,131.88 5,970,098.881 644,687.372 0.95 -1,608.39 6,572.82 45.92 110.63 5,751.80 5,682.00 -480.81 2,145.32 5,970,094.073 644,700.907 0.18 -1,617.50 6,592.82 45.80 110.65 5,765.73 5,695.93 -485.87 2,158.76 5,970,089.271 644,714.431 0.60 -1,626.61 6,612.82 45.95 110.75 5,779.65 5,709.85 -490.94 2,172.19 5,970,084.452 644,727.953 0.83 -1,635.70 6,632.82 45.85 110.71 5,793.57 5,723.77 -496.02 2,185.62 5,970,079.625 644,741.479 0.52 -1,644.79 6,652.82 45.80 110.64 5,807.51 5,737.71 -501.09 2,199.04 5,970,074.817 644,754.992 0.35 -1,653.88 6,672.82 45.65 110.71 5,821.47 5,751.67 -506.14 2,212.44 5,970,070.017 644,768.483 0.79 -1,662.95 6,692.82 45.64 110.82 5,835.45 5,765.65 -511.21 2,225.81 5,970,065.202 644,781.947 0.40 -1,672.00 6,712.82 45.54 110.89 5,849.45 5,779.65 -516.30 2,239.16 5,970,060.371 644,795.391 0.56 -1,681.02 12/26/2019 9:42:49AM Page 10 COMPASS 5000.15 Build 90 Company: North America - ALASKA - 3P Project: Pau Site: J Well: J-17 Wellbore: J -17E Design: J -17E Survey J-1 7D @ 69.80usft (Nordic 1) MD (usft) 6,732.82 6,752.82 6,772.82 6,792.82 6,812.82 6,832.82 6,852.82 6,872.82 6,892.82 6,912.82 6,932.82 6,952.82 6,972.82 6,992.82 7,012.82 7,032.82 7,052.82 7,072.82 7,092.82 7,112.82 7,132.82 7,152.82 7,172.82 7,192.82 7,212.82 7,232.82 7,252.82 BP Azi TVD TVDSS NIS Baker Final Survey Report Easting Hughes Local Coordinate Reference: Well J-17 (°) ND Reference: J-1 7D @ 69.80usft (Nordic 1) (usft) MD Reference: J-1 7D @ 69.80usft (Nordic 1) (usft) North Reference: True 45.49 Survey Calculation Method: Minimum Curvature 5,793.66 Database: EDM R5K - Alaska PROD - ANCP1 5,970,055.510 Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 45.49 111.12 5,863.46 5,793.66 -521.41 2,252.48 5,970,055.510 644,808.805 0.86 -1,690.00 45.26 111.13 5,877.51 5,807.71 -526.55 2,265.76 5,970,050.634 644,822.177 1.15 -1,698.93 45.35 111.22 5,891.58 5,821.78 -531.68 2,279.01 5,970,045.752 644,835.529 0.55 -1,707.84 45.12 111.22 5,905.66 5,835.86 -536.82 2,292.25 5,970,040.865 644,848.860 1.15 -1,716.74 45.24 111.14 5,919.76 5,849.96 -541.95 2,305.48 5,970,035.992 644,862.182 0.66 -1,725.63 45.03 111.02 5,933.87 5,864.07 -547.04 2,318.71 5,970,031.146 644,875.503 1.13 -1,734.54 45.11 110.98 5,947.99 5,878.19 -552.12 2,331.93 5,970,026.324 644,888.815 0.42 -1,743.45 45.05 110.94 5,962.11 5,892.31 -557.18 2,345.15 5,970,021.511 644,902.132 0.33 -1,752.37 45.19 110.85 5,976.23 5,906.43 -562.24 2,358.39 5,970,016.709 644,915.464 0.77 -1,761.31 45.03 110.99 5,990.34 5,920.54 -567.30 2,371.63 5,970,011.902 644,928.792 0.94 -1,770.24 44.94 110.88 6,004.49 5,934.69 -572.35 2,384.83 5,970,007.103 644,942.090 0.59 -1,779.15 44.86 110.80 6,018.65 5,948.85 -577.37 2,398.02 5,970,002.332 644,955.376 0.49 -1,788.06 44.75 110.75 6,032.84 5,963.04 -582.37 2,411.20 5,969,997.585 644,968.645 0.58 -1,796.98 44.63 110.79 6,047.06 5,977.26 -587.36 2,424.35 5,969,992.848 644,981.888 0.62 -1,805.87 44.45 110.73 6,061.32 5,991.52 -592.33 2,437.47 5,969,988.126 644,995.096 0.92 -1,814.75 44.58 110.65 6,075.58 6,005.78 -597.29 2,450.59 5,969,983.423 645,008.304 0.71 -1,823.63 44.44 110.88 6,089.84 6,020.04 -602.26 2,463.70 5,969,978.702 645,021.505 1.07 -1,832.50 44.36 110.78 6,104.13 6,034.33 -607.23 2,476.78 5,969,973.976 645,034.675 0.53 -1,841.34 44.09 110.67 6,118.46 6,048.66 -612.17 2,489.82 5,969,969.288 645,047.813 1.40 -1,850.17 44.20 110.79 6,132.81 6,063.01 -617.10 2,502.85 5,969,964.607 645,060.931 0.69 -1,858.98 44.06 110.91 6,147.17 6,077.37 -622.06 2,515.87 5,969,959.899 645,074.035 0.82 -1,867.78 44.40 110.90 6,161.50 6,091.70 -627.03 2,528.90 5,969,955.170 645,087.159 1.70 -1,876.57 44.06 110.84 6,175.83 6,106.03 -632.00 2,541.93 5,969,950.449 645,100.285 1.71 -1,885.38 43.54 110.73 6,190.27 6,120.47 -636.92 2,554.88 5,969,945.783 645,113.317 2.63 -1,894.13 43.76 110.66 6,204.74 6,134.94 -641.79 2,567.79 5,969,941.151 645,126.321 1.13 -1,902.87 43.61 110.80 6,219.20 6,149.40 -646.68 2,580.71 5,969,936.508 645,139.330 0.89 -1,911.62 43.60 110.97 6,233.68 6,163.88 -651.60 2,593.60 5,969,931.837 645,152.307 0.59 -1,920.32 12/26/2019 9:42 49AM Page 11 COMPASS 5000.15 Build 90 -WOOJLVbp Inc BP ND TVDSS N/S EJW Northing Easting DLeg V. Sec Baker (°) (°) Final Survey Report (usft) Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 (usft) Project: PBU TVD Reference: J-1 7D @ 69.80usft (Nordic 1) 6,178.39 Site: J MD Reference: J-17D @ 69.80usft (Nordic 1) 1.10 Well: J-17 North Reference: True 6,262.71 Wellbore: J-17E Survey Calculation Method: Minimum Curvature 645,178.163 Design: J-17E Database: EDM R5K - Alaska PROD - ANCP1 111.26 Survey MD Inc Azi ND TVDSS N/S EJW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,272.82 43.40 111.10 6,248.19 6,178.39 -656.54 2,606.45 5,969,927.141 645,165.248 1.10 -1,928.98 7,292.82 43.49 111.26 6,262.71 6,192.91 -661.51 2,619.27 5,969,922.417 645,178.163 0.71 -1,937.60 7,312.82 43.32 111.26 6,277.24 6,207.44 -666.50 2,632.08 5,969,917.678 645,191.062 0.85 -1,946.20 7,332.82 42.93 110.97 6,291.84 6,222.04 -671.42 2,644.83 5,969,912.997 645,203.906 2.19 -1,954.78 7,352.82 42.97 111.13 6,306.48 6,236.68 -676.32 2,657.55 5,969,908.345 645,216.714 0.58 -1,963.35 7,372.82 43.00 111.11 6,321.11 6,251.31 -681.23 2,670.27 5,969,903.674 645,229.524 0.16 -1,971.91 7,392.82 42.91 111.20 6,335.75 6,265.95 -686.15 2,682.98 5,969,898.999 645,242.324 0.54 -1,980.45 7,412.82 42.86 111.37 6,350.40 6,280.60 -691.09 2,695.66 5,969,894.300 645,255.097 0.63 -1,988.97 7,432.82 42.47 111.54 6,365.11 6,295.31 -696.05 2,708.28 5,969,889.583 645,267.803 2.03 -1,997.41 7,452.82 42.49 111.57 6,379.86 6,310.06 -701.01 2,720.84 5,969,884.861 645,280.456 0.14 -2,005.81 7,472.82 42.37 111.43 6,394.62 6,324.82 -705.95 2,733.39 5,969,880.155 645,293.101 0.76 -2,014.21 7,492.82 42.40 111.37 6,409.39 6,339.59 -710.87 2,745.95 5,969,875.476 645,305.744 0.25 -2,022.62 7,512.82 42.21 111.58 6,424.18 6,354.38 -715.80 2,758.47 5,969,870.787 645,318.362 1.18 -2,031.01 7,532.82 42.26 111.61 6,438.99 6,369.19 -720.75 2,770.97 5,969,866.078 645,330.952 0.27 -2,039.36 7,552.82 42.00 111.64 6,453.82 6,384.02 -725.69 2,783.45 5,969,861.372 645,343.515 1.30 -2,047.69 7,572.82 42.05 111.76 6,468.68 6,398.88 -730.64 2,795.89 5,969,856.659 645,356.046 0.47 -2,055.99 7,592.82 41.89 111.78 6,483.55 6,413.75 -735.60 2,808.31 5,969,851.936 645,368.558 0.80 -2,064.26 7,612.82 41.86 111.93 6,498.44 6,428.64 -740.57 2,820.70 5,969,847.202 645,381.040 0.52 -2,072.51 7,632.82 41.64 111.85 6,513.36 6,443.56 -745.54 2,833.05 5,969,842.473 645,393.488 1.13 -2,080.73 7,652.82 41.68 112.02 6,528.31 6,458.51 -750.51 2,845.39 5,969,837.743 645,405.911 0.60 -2,088.92 7,672.82 41.48 112.01 6,543.27 6,473.47 -755.48 2,857.69 5,969,833.002 645,418.308 1.00 -2,097.09 7,692.82 41.47 111.72 6,558.25 6,488.45 -760.41 2,869.98 5,969,828.304 645,430.692 0.96 -2,105.27 7,712.82 41.30 111.83 6,573.26 6,503.46 -765.32 2,882.26 5,969,823.634 645,443.061 0.92 -2,113.45 7,732.82 41.13 112.32 6,588.30 6,518.50 -770.27 2,894.48 5,969,818.915 645,455.363 1.82 -2,121.55 7,752.82 40.96 112.52 6,603.39 6,533.59 -775.28 2,906.62 5,969,814.138 645,467.596 1.07 -2,129.56 7,772.82 40.87 112.13 6,618.50 6,548.70 -780.26 2,918.73 5,969,809.393 645,479.804 1.35 -2,137.57 7,792.82 39.87 110.66 6,633.74 6,563.94 -784.98 2,930.79 5,969,804.897 645,491.951 6.90 -2,145.65 12/26/2019 9:42:49AM Page 12 COMPASS 5000.15 Build 90 BP by Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU ND Reference: J -17D @ 69.80usft (Nordic 1) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,812.82 39.94 109.78 6,649.08 6,579.28 -789.42 2,942.83 5,969,800.692 645,504.071 2.84 -2,153.86 7,832.82 38.92 107.97 6,664.53 6,594.73 -793.53 2,954.85 5,969,796.811 645,516.164 7.68 -2,162.21 7,852.82 38.39 106.77 6,680.15 6,610.35 -797.26 2,966.77 5,969,793.308 645,528.154 4.59 -2,170.67 7,872.82 37.47 106.10 6,695.92 6,626.12 -800.74 2,978.56 5,969,790.054 645,540.008 5.04 -2,179.14 7,892.82 35.93 104.77 6,711.96 6,642.16 -803.92 2,990.08 5,969,787.090 645,551.585 8.66 -2,187.53 7,912.82 35.01 103.97 6,728.25 6,658.45 -806.80 3,001.32 5,969,784.424 645,562.879 5.15 -2,195.82 7,932.82 34.71 102.10 6,744.66 6,674.86 -809.38 3,012.46 5,969,782.057 645,574.061 5.55 -2,204.18 7,952.82 34.86 100.79 6,761.08 6,691.28 -811.64 3,023.64 5,969,780.006 645,585.284 3.81 -2,212.73 7,972.82 34.57 101.30 6,777.52 6,707.72 -813.83 3,034.82 5,969,778.038 645,596.501 2.05 -2,221.32 7,992.82 34.81 100.85 6,793.97 6,724.17 -816.01 3,045.99 5,969,776.064 645,607.710 1.75 -2,229.90 8,012.82 34.77 100.62 6,810.39 6,740.59 -818.14 3,057.20 5,969,774.152 645,618.960 0.69 -2,238.55 8,032.82 34.57 100.42 6,826.84 6,757.04 -820.21 3,068.39 5,969,772.288 645,630.182 1.15 -2,247.20 8,052.82 34.52 100.46 6,843.32 6,773.52 -822.27 3,079.54 5,969,770.445 645,641.371 0.27 -2,255.83 8,072.82 34.45 100.51 6,859.80 6,790.00 -824.33 3,090.68 5,969,768.596 645,652.542 0.38 -2,264.44 8,092.82 34.55 100.69 6,876.28 6,806.48 -826.41 3,101.81 5,969,766.725 645,663.714 0.71 -2,273.04 8,112.82 34.41 100.87 6,892.77 6,822.97 -828.53 3,112.94 5,969,764.819 645,674.874 0.87 -2,281.62 8,132.82 34.50 101.55 6,909.26 6,839.46 -830.73 3,124.03 5,969,762.830 645,686.012 1.98 -2,290.13 8,152.82 34.53 100.87 6,925.74 6,855.94 -832.93 3,135.15 5,969,760.839 645,697.167 1.93 -2,298.65 8,172.82 34.69 100.89 6,942.20 6,872.40 -835.08 3,146.31 5,969,758.907 645,708.360 0.80 -2,307.24 8,192.82 34.53 101.38 6,958.66 6,888.86 -837.27 3,157.45 5,969,756.926 645,719.545 1.61 -2,315.80 8,212.82 34.64 101.87 6,975.13 6,905.33 -839.56 3,168.57 5,969,754.850 645,730.705 1.50 -2,324.28 8,232.82 34.62 101.79 6,991.59 6,921.79 -841.89 3,179.70 5,969,752.732 645,741.871 0.25 -2,332.75 8,252.82 34.69 102.15 7,008.04 6,938.24 -844.25 3,190.82 5,969,750.585 645,753.038 1.08 -2,341.21 8,272.82 34.62 102.29 7,024.49 6,954.69 -846.66 3,201.94 5,969,748.390 645,764.196 0.53 -2,349.63 8,292.82 34.49 102.35 7,040.96 6,971.16 -849.08 3,213.02 5,969,746.181 645,775.322 0.67 -2,358.02 8,312.82 34.44 102.53 7,057.45 6,987.65 -851.51 3,224.07 5,969,743.953 645,786.417 0.57 -2,366.37 8,332.82 34.41 102.72 7,073.95 7,004.15 -853.99 3,235.10 5,969,741.692 645,797.495 0.56 -2,374.69 12/26/2019 9:42:49AM Page 13 COMPASS 5000.15 Build 90 �� Survey Final Report Baker Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU ND Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J-1 7D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,352.82 34.39 103.07 7,090.45 7,020.65 -856.51 3,246.12 5,969,739.380 645,808.554 0.99 -2,382.97 8,372.82 34.55 103.15 7,106.94 7,037.14 -859.08 3,257.14 5,969,737.023 645,819.624 0.83 -2,391.23 8,392.82 34.59 102.91 7,123.41 7,053.61 -861.63 3,268.20 5,969,734.675 645,830.726 0.71 -2,399.53 8,412.82 34.91 103.37 7,139.84 7,070.04 -864.23 3,279.30 5,969,732.295 645,841.874 2.07 -2,407.84 8,432.82 34.91 104.34 7,156.24 7,086.44 -866.97 3,290.41 5,969,729.766 645,853.036 2.78 -2,416.10 8,452.82 35.00 104.32 7,172.63 7,102.83 -869.80 3,301.51 5,969,727.141 645,864.189 0.45 -2,424.29 8,472.82 35.31 104.94 7,188.98 7,119.18 -872.71 3,312.66 5,969,724.445 645,875.383 2.36 -2,432.49 8,492.82 35.56 105.27 7,205.28 7,135.48 -875.73 3,323.85 5,969,721.637 645,886.633 1.57 -2,440.67 8,512.82 35.90 105.46 7,221.52 7,151.72 -878.83 3,335.11 5,969,718.757 645,897.951 1.79 -2,448.88 8,532.82 36.03 105.96 7,237.70 7,167.90 -882.01 3,346.42 5,969,715.792 645,909.315 1.61 -2,457.08 8,552.82 36.27 106.27 7,253.85 7,184.05 -885.28 3,357.76 5,969,712.733 645,920.709 1.51 -2,465.26 8,572.82 36.52 106.55 7,269.95 7,200.15 -888.64 3,369.14 5,969,709.598 645,932.153 1.50 -2,473.44 8,592.82 36.73 107.37 7,286.00 7,216.20 -892.12 3,380.55 5,969,706.335 645,943.628 2.66 -2,481.58 8,612.82 36.95 107.99 7,302.01 7,232.21 -895.76 3,391.98 5,969,702.911 645,955.120 2.16 -2,489.66 8,632.82 37.21 108.18 7,317.97 7,248.17 -899.50 3,403.44 5,969,699.386 645,966.651 1.42 -2,497.71 8,652.82 37.52 108.43 7,333.86 7,264.06 -903.31 3,414.96 5,969,695.794 645,978.244 1.73 -2,505.79 8,672.82 37.76 108.70 7,349.70 7,279.90 -907.20 3,426.54 5,969,692.126 645,989.893 1.46 -2,513.87 8,692.82 38.02 109.17 7,365.48 7,295.68 -911.19 3,438.16 5,969,688.362 646,001.584 1.94 -2,521.94 8,712.82 38.12 109.60 7,381.23 7,311.43 -915.28 3,449.79 5,969,684.491 646,013.292 1.42 -2,529.97 8,732.82 38.35 110.19 7,396.94 7,327.14 -919.49 3,461.43 5,969,680.501 646,025.008 2.16 -2,537.94 8,752.82 38.47 110.80 7,412.61 7,342.81 -923.84 3,473.07 5,969,676.372 646,036.726 1.99 -2,545.84 8,772.82 38.85 111.35 7,428.23 7,358.43 -928.34 3,484.73 5,969,672.102 646,048.467 2.56 -2,553.69 8,792.82 39.04 112.25 7,443.78 7,373.98 -933.01 3,496.40 5,969,667.656 646,060.225 2.98 -2,561.47 8,812.82 39.23 113.04 7,459.29 7,389.49 -937.87 3,508.05 5,969,663.019 646,071.963 2.67 -2,569.13 8,832.82 39.43 112.95 7,474.76 7,404.96 -942.82 3,519.72 5,969,658.290 646,083.723 1.04 -2,576.76 8,852.82 38.91 112.28 7,490.27 7,420.47 -947.68 3,531.38 5,969,653.655 646,095.473 3.35 -2,584.43 8,872.82 38.97 112.15 7,505.83 7,436.03 -952.43 3,543.02 5,969,649.124 646,107.197 0.51 -2,592.13 12126/2019 9:42:49AM Page 14 COMPASS 5000.15 Build 90 �,MR• BP p Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 Project: PBU TVD Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J-1 7D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,892.12 39.07 112.70 7,520.82 7,451.02 -957.06 3,554.25 5,969,644.704 646,118.515 1.87 -2,599.54 8,931.00 38.64 114.58 7,551.10 7,481.30 -966.84 3,576.59 5,969,635.353 646,141.038 3.23 -2,614.00 8,964.38 40.45 111.52 7,576.84 7,507.04 -975.15 3,596.15 5,969,627.418 646,160.745 7.97 -2,626.78 8,995.99 41.82 108.63 7,600.65 7,530.85 -982.28 3,615.67 5,969,620.661 646,180.404 7.41 -2,640.13 9,026.82 42.70 105.80 7,623.47 7,553.67 -988.41 3,635.47 5,969,614.909 646,200.316 6.80 -2,654.21 9,056.54 43.56 103.08 7,645.16 7,575.36 -993.47 3,655.15 5,969,610.222 646,220.080 6.89 -2,668.72 9,088.98 44.48 100.10 7,668.49 7,598.69 -998.00 3,677.23 5,969,606.119 646,242.240 6.98 -2,685.57 9,119.47 45.08 97.31 7,690.13 7,620.33 -1,001.24 3,698.45 5,969,603.276 646,263.521 6.74 -2,702.33 9,151.23 45.83 94.40 7,712.42 7,642.62 -1,003.55 3,720.97 5,969,601.400 646,286.072 6.94 -2,720.68 9,185.86 46.28 91.89 7,736.45 7,666.65 -1,004.91 3,745.86 5,969,600.507 646,310.984 5.38 -2,741.55 9,213.84 46.98 89.88 7,755.66 7,685.86 -1,005.22 3,766.19 5,969,600.581 646,331.320 5.79 -2,759.01 9,245.04 47.26 88.90 7,776.90 7,707.10 -1,004.98 3,789.05 5,969,601.259 646,354.170 2.47 -2,778.93 9,291.65 47.59 88.62 7,808.43 7,738.63 -1,004.24 3,823.37 5,969,602.654 646,388.462 0.83 -2,809.02 9,338.99 47.61 89.37 7,840.35 7,770.55 -1,003.62 3,858.32 5,969,603.931 646,423.394 1.17 -2,839.59 9,432.73 48.70 87.80 7,902.89 7,833.09 -1,001.89 3,928.13 5,969,606.989 646,493.148 1.71 -2,900.91 9,481.79 48.46 87.72 7,935.34 7,865.54 -1,000.45 3,964.89 5,969,609.125 646,529.873 0.50 -2,933.47 9,526.54 48.00 87.45 7,965.15 7,895.35 -999.05 3,998.23 5,969,611.164 646,563.183 1.12 -2,963.05 9,573.70 48.25 85.75 7,996.64 7,926.84 -996.96 4,033.28 5,969,613.913 646,598.186 2.74 -2,994.44 9,619.51 47.66 85.26 8,027.32 7,957.52 -994.30 4,067.20 5,969,617.222 646,632.041 1.51 -3,025.15 9,670.37 47.18 85.56 8,061.73 7,991.93 -991.30 4,104.53 5,969,620.928 646,669.304 1.04 -3,058.97 9,713.21 48.00 87.47 8,090.62 8,020.82 -989.38 4,136.10 5,969,623.446 646,700.828 3.81 -3,087.27 9,806.22 47.50 88.25 8,153.16 8,083.36 -986.81 4,204.90 5,969,627.325 646,769.560 0.82 -3,148.14 9,899.59 48.10 87.28 8,215.88 8,146.08 -984.11 4,274.01 5,969,631.338 646,838.605 1.00 -3,209.35 9,992.94 49.41 89.33 8,277.42 8,207.62 -982.05 4,344.16 5,969,634.733 646,908.699 2.17 -3,271.13 10,086.86 49.09 89.43 8,338.73 8,268.93 -981.28 4,415.31 5,969,636.854 646,979.812 0.35 -3,333.13 10,174.20 48.73 88.95 8,396.13 8,326.33 -980.35 4,481.13 5,969,639.034 647,045.597 0.58 -3,390.60 Tie in point 12/26/2019 9:42:49AM Page 15 COMPASS 5000.15 Build 90 BP by Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU TVD Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J-1 7D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,270.00 49.61 88.50 8,458.77 8,388.97 -978.73 4,553.59 5,969,642.025 647,118.016 0.98 -3,454.16 KOP - Top of Whipstock 10,290.25 47.66 89.88 8,472.15 8,402.35 -978.51 4,568.79 5,969,642.532 647,133.203 10.90 -3,467.43 Interpolated Azimuth 10,320.41 45.11 92.12 8,492.96 8,423.16 -978.89 4,590.62 5,969,642.574 647,155.032 10.02 -3,486.15 Interpolated Azimuth 10,350.09 41.00 94.60 8,514.64 8,444.84 -980.06 4,610.84 5,969,641.789 647,175.270 14.97 -3,503.07 Interpolated Azimuth 10,380.35 37.60 97.49 8,538.06 8,468.26 -982.06 4,629.89 5,969,640.151 647,194.357 12.76 -3,518.58 10,410.20 35.79 100.92 8,561.99 8,492.19 -984.90 4,647.50 5,969,637.645 647,212.009 9.16 -3,532.40 10,440.19 37.20 106.86 8,586.11 8,516.31 -989.19 4,664.79 5,969,633.682 647,229.379 12.68 -3,545.23 10,470.40 38.62 112.16 8,609.95 8,540.15 -995.40 4,682.27 5,969,627.809 647,246.970 11.76 -3,557.26 10,500.35 39.28 118.19 8,633.25 8,563.45 -1,003.40 4,699.28 5,969,620.127 647,264.136 12.84 -3,568.00 10,530.42 38.64 124.01 8,656.64 8,586.84 -1,013.16 4,715.46 5,969,610.686 647,280.495 12.35 -3,577.13 10,560.49 38.58 130.33 8,680.15 8,610.35 -1,024.48 4,730.40 5,969,599.649 647,295.642 13.11 -3,584.40 10,588.97 39.97 135.97 8,702.20 8,632.40 -1,036.81 4,743.53 5,969,587.573 647,309.005 13.45 -3,589.61 10,620.19 41.48 141.17 8,725.86 8,656.06 -1,052.08 4,756.99 5,969,572.563 647,322.749 11.89 -3,593.63 10,650.21 42.15 149.60 8,748.26 8,678.46 -1,068.52 4,768.33 5,969,556.336 647,334.399 18.85 -3,595.23 10,679.49 42.87 156.06 8,769.85 8,700.05 -1,086.11 4,777.34 5,969,538.926 647,343.748 15.11 -3,594.25 10,710.17 43.24 161.82 8,792.28 8,722.48 -1,105.64 4,784.86 5,969,519.544 647,351.634 12.87 -3,590.99 10,740.41 45.73 167.85 8,813.86 8,744.06 -1,126.08 4,790.38 5,969,499.216 647,357.535 16.21 -3,585.55 10,770.30 50.26 173.77 8,833.87 8,764.07 -1,147.99 4,793.88 5,969,477.380 647,361.453 21.11 -3,577.63 10,800.18 52.29 180.11 8,852.57 8,782.77 -1,171.24 4,795.10 5,969,454.153 647,363.119 17.89 -3,567.06 10,829.88 52.67 186.95 8,870.67 8,800.87 -1,194.73 4,793.65 5,969,430.644 647,362.113 18.31 -3,554.06 10,860.16 53.83 183.80 8,888.79 8,818.99 -1,218.88 4,791.38 5,969,406.457 647,360.306 9.17 -3,540.02 10,890.42 56.94 177.08 8,905.99 8,836.19 -1,243.76 4,791.22 5,969,381.584 647,360.615 20.96 -3,527.44 10,920.28 57.61 171.12 8,922.15 8,852.35 -1,268.72 4,793.81 5,969,356.671 647,363.674 16.94 -3,517.19 12/26/2019 9:42:49AM Page 16 COMPASS 5000.15 Build 90 U000XC M b BP Baker Final Survey Report HugheNW ss Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU ND Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,950.20 58.36 177.24 8,938.02 8,868.22 -1,293.95 4,796.37 5,969,331.506 647,366.717 17.52 -3,506.81 10,980.43 59.64 182.42 8,953.59 8,883.79 -1,319.84 4,796.44 5,969,305.616 647,367.278 15.28 -3,493.92 11,011.76 63.84 187.40 8,968.43 8,898.63 -1,347.32 4,794.06 5,969,278.104 647,365.417 19.38 -3,478.12 11,040.98 65.13 192.46 8,981.03 8,911.23 -1,373.28 4,789.50 5,969,252.062 647,361.360 16.24 -3,461.19 11,070.47 67.67 196.43 8,992.83 8,923.03 -1,399.44 4,782.76 5,969,225.783 647,355.111 15.04 -3,442.27 11,100.75 70.58 199.05 9,003.62 8,933.82 -1,426.38 4,774.13 5,969,198.686 647,347.000 12.56 -3,421.33 11,130.30 72.56 203.15 9,012.97 8,943.17 -1,452.52 4,764.04 5,969,172.357 647,337.405 14.77 -3,399.52 11,160.25 75.47 206.87 9,021.22 8,951.42 -1,478.60 4,751.86 5,969,146.051 647,325.728 15.39 -3,375.93 11,190.27 79.28 209.03 9,027.78 8,957.98 -1,504.47 4,738.13 5,969,119.928 647,312.493 14.50 -3,351.11 11,220.30 82.64 210.73 9,032.50 8,962.70 -1,530.18 4,723.36 5,969,093.945 647,298.211 12.51 -3,325.46 11,250.45 84.53 215.62 9,035.87 8,966.07 -1,555.25 4,706.97 5,969,068.572 647,282.301 17.29 -3,298.73 11,280.38 85.21 215.25 9,038.55 8,968.75 -1,579.54 4,689.68 5,969,043.962 647,265.484 2.58 -3,271.62 11,310.52 86.06 211.16 9,040.84 8,971.04 -1,604.68 4,673.23 5,969,018.516 647,249.512 13.82 -3,244.80 11,340.61 87.76 207.14 9,042.46 8,972.66 -1,630.91 4,658.60 5,968,992.010 647,235.383 14.49 -3,219.01 11,370.29 91.47 204.69 9,042.66 8,972.86 -1,657.60 4,645.63 5,968,965.082 647,222.926 14.98 -3,194.44 11,400.45 94.68 201.02 9,041.04 8,971.24 -1,685.34 4,633.94 5,968,937.124 647,211.761 16.15 -3,170.44 11,430.17 96.38 197.30 9,038.18 8,968.38 -1,713.28 4,624.23 5,968,909.010 647,202.586 13.71 -3,148.06 11,460.49 95.63 193.84 9,035.01 8,965.21 -1,742.32 4,616.14 5,968,879.821 647,195.048 11.62 -3,126.53 11,490.55 93.32 190.97 9,032.66 8,962.86 -1,771.59 4,609.70 5,968,850.442 647,189.170 12.23 -3,106.33 11,520.82 91.04 188.24 9,031.51 8,961.71 -1,801.40 4,604.66 5,968,820.535 647,184.692 11.74 -3,087.05 11,550.42 88.80 184.91 9,031.55 8,961.75 -1,830.80 4,601.27 5,968,791.079 647,181.863 13.56 -3,069.41 11,582.14 89.23 182.79 9,032.10 8,962.30 -1,862.45 4,599.14 5,968,759.405 647,180.335 6.82 -3,051.75 11,610.70 89.69 185.92 9,032.36 8,962.56 -1,890.92 4,596.97 5,968,730.898 647,178.708 11.08 -3,035.63 11,641.31 88.68 187.64 9,032.80 8,963.00 -1,921.31 4,593.36 5,968,700.446 647,175.673 6.52 -3,017.31 11,670.77 88.19 190.86 9,033.61 8,963.81 -1,950.37 4,588.62 5,968,671.301 647,171.493 11.05 -2,998.68 11,700.40 91.11 194.20 9,033.79 8,963.99 -1,979.29 4,582.20 5,968,642.270 647,165.618 14.97 -2,978.65 11,730.13 91.14 197.55 9,033.20 8,963.40 -2,007.87 4,574.07 5,968,613.537 647,158.033 11.27 -2,957.32 12/26/2019 9:42:49AM Page 17 COMPASS 5000.15 Build 90 `•��Z 1 BP Z by Final Survey Report Baker -�/ Hughes w Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU ND Reference: J -17D @ 69.80usft (Nordic 1) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,760.38 89.23 200.73 9,033.10 8,963.30 -2,036.45 4,564.15 5,968,584.783 647,148.662 12.26 -2,934.45 11,790.30 89.26 203.96 9,033.50 8,963.70 -2,064.11 4,552.78 5,968,556.907 647,137.818 10.79 -2,910.76 11,820.29 87.73 206.72 9,034.29 8,964.49 -2,091.21 4,539.95 5,968,529.578 647,125.507 10.52 -2,886.11 11,850.47 88.16 209.31 9,035.37 8,965.57 -2,117.83 4,525.78 5,968,502.692 647,111.851 8.69 -2,860.53 11,880.63 87.54 212.56 9,036.50 8,966.70 -2,143.68 4,510.29 5,968,476.556 647,096.855 10.96 -2,834.19 11,910.16 91.01 216.69 9,036.87 8,967.07 -2,167.97 4,493.52 5,968,451.955 647,080.549 18.26 -2,807.52 11,940.38 88.65 221.93 9,036.96 8,967.16 -2,191.34 4,474.38 5,968,428.225 647,061.861 19.02 -2,779.26 11,970.37 88.13 227.63 9,037.81 8,968.01 -2,212.61 4,453.28 5,968,406.559 647,041.163 19.08 -2,750.35 12,001.38 89.39 232.72 9,038.48 8,968.68 -2,232.46 4,429.47 5,968,386.264 647,017.744 16.91 -2,719.81 12,031.39 89.17 238.65 9,038.86 8,969.06 -2,249.37 4,404.70 5,968,368.889 646,993.298 19.77 -2,689.90 12,060.48 88.62 242.51 9,039.42 8,969.62 -2,263.65 4,379.37 5,968,354.127 646,968.247 13.40 -2,660.82 12,090.88 87.02 247.83 9,040.58 8,970.78 -2,276.40 4,351.81 5,968,340.855 646,940.938 18.26 -2,630.58 12,121.34 88.89 251.52 9,041.66 8,971.86 -2,286.97 4,323.27 5,968,329.745 646,912.607 13.57 -2,600.58 12,153.35 91.63 254.01 9,041.52 8,971.72 -2,296.46 4,292.71 5,968,319.684 646,882.228 11.57 -2,569.36 12,180.53 92.15 257.19 9,040.62 8,970.82 -2,303.21 4,266.40 5,968,312.431 646,856.055 11.85 -2,543.20 12,210.81 91.14 261.28 9,039.75 8,969.95 -2,308.86 4,236.67 5,968,306.216 646,826.441 13.91 -2,514.63 12,240.43 92.21 265.33 9,038.88 8,969.08 -2,312.31 4,207.27 5,968,302.207 646,797.116 14.14 -2,487.45 12,273.49 92.71 269.64 9,037.47 8,967.67 -2,313.76 4,174.28 5,968,300.131 646,764.162 13.11 -2,458.15 12,299.69 93.81 273.75 9,035.97 8,966.17 -2,312.99 4,148.14 5,968,300.408 646,738.014 16.21 -2,435.90 12,329.75 93.62 279.47 9,034.03 8,964.23 -2,309.54 4,118.36 5,968,303.293 646,708.171 19.00 -2,411.83 12,361.64 91.17 283.86 9,032.69 8,962.89 -2,303.10 4,087.16 5,968,309.139 646,676.863 15.75 -2,388.04 12,389.66 90.58 288.20 9,032.26 8,962.46 -2,295.36 4,060.24 5,968,316.361 646,649.802 15.63 -2,368.59 12,421.19 89.54 293.08 9,032.23 8,962.43 -2,284.25 4,030.74 5,968,326.908 646,620.102 15.82 -2,348.60 12,450.47 89.26 296.68 9,032.54 8,962.74 -2,271.94 4,004.19 5,968,338.717 646,593.318 12.33 -2,331.76 12,481.92 91.04 294.21 9,032.46 8,962.66 -2,258.43 3,975.79 5,968,351.684 646,564.673 9.68 -2,313.92 12,510.56 91.78 291.18 9,031.75 8,961.95 -2,247.38 3,949.38 5,968,362.225 646,538.059 10.89 -2,296.57 12,540.56 91.60 289.08 9,030.87 8,961.07 -2,237.06 3,921.23 5,968,372.007 646,509.716 7.02 -2,277.35 12/26/2019 9:42:49AM Page 18 COMPASS 5000.15 Build 90 U0111119b BP p Final Survey Report Baker Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU TVD Reference: J -17D @ 69.80usft (Nordic 1) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,570.52 90.34 286.29 9,030.36 8,960.56 -2,227.96 3,892.69 5,968,380.562 646,481.014 10.22 -2,257.19 12,600.89 89.66 283.56 9,030.36 8,960.56 -2,220.14 3,863.35 5,968,387.823 646,451.530 9.26 -2,235.69 12,630.56 88.83 281.19 9,030.75 8,960.95 -2,213.78 3,834.37 5,968,393.629 646,422.441 8.46 -2,213.77 12,662.08 90.28 279.51 9,030.99 8,961.19 -2,208.12 3,803.37 5,968,398.701 646,391.337 7.04 -2,189.75 12,690.55 89.45 277.38 9,031.06 8,961.26 -2,203.94 3,775.21 5,968,402.345 646,363.106 8.03 -2,167.46 12,721.32 90.71 274.73 9,031.02 8,961.22 -2,200.70 3,744.61 5,968,405.009 646,332.457 9.54 -2,142.58 12,753.89 91.72 272.68 9,030.33 8,960.53 -2,198.59 3,712.12 5,968,406.495 646,299.933 7.02 -2,115.50 12,780.78 89.42 271.33 9,030.06 8,960.26 -2,197.65 3,685.25 5,968,406.925 646,273.052 9.92 -2,092.70 12,810.80 89.29 268.03 9,030.40 8,960.60 -2,197.82 3,655.24 5,968,406.187 646,243.050 11.00 -2,066.62 12,840.50 90.43 266.43 9,030.47 8,960.67 -2,199.25 3,625.57 5,968,404.189 646,213.421 6.61 -2,040.21 12,873.65 88.56 259.89 9,030.76 8,960.96 -2,203.20 3,592.68 5,968,399.620 646,180.611 20.52 -2,009.75 12,900.55 89.29 256.69 9,031.27 8,961.47 -2,208.66 3,566.35 5,968,393.663 646,154.390 12.20 -1,984.22 12,931.53 88.40 258.84 9,031.89 8,962.09 -2,215.22 3,536.08 5,968,386.526 646,124.254 7.51 -1,954.73 12,960.57 87.36 262.56 9,032.97 8,963.17 -2,219.91 3,507.45 5,968,381.294 646,095.717 13.29 -1,927.58 12,990.63 89.26 266.98 9,033.85 8,964.05 -2,222.65 3,477.53 5,968,377.989 646,065.864 16.00 -1,900.31 13,020.73 88.77 270.89 9,034.37 8,964.57 -2,223.21 3,447.45 5,968,376.858 646,035.798 13.09 -1,873.98 13,050.57 92.00 274.73 9,034.17 8,964.37 -2,221.74 3,417.66 5,968,377.754 646,005.984 16.81 -1,848.91 13,079.84 93.53 278.58 9,032.76 8,962.96 -2,218.36 3,388.62 5,968,380.588 645,976.894 14.14 -1,825.46 13,110.73 92.40 283.26 9,031.16 8,961.36 -2,212.51 3,358.34 5,968,385.854 645,946.510 15.57 -1,802.15 13,140.61 89.26 286.07 9,030.73 8,960.93 -2,204.95 3,329.45 5,968,392.866 645,917.477 14.10 -1,780.91 13,170.50 87.73 289.49 9,031.51 8,961.71 -2,195.83 3,301.00 5,968,401.445 645,888.863 12.53 -1,760.83 13,200.51 89.57 291.49 9,032.22 8,962.42 -2,185.33 3,272.90 5,968,411.410 645,860.570 9.05 -1,741.75 13,230.45 89.63 288.22 9,032.43 8,962.63 -2,175.16 3,244.74 5,968,421.040 645,832.229 10.92 -1,722.45 13,260.44 90.34 285.37 9,032.44 8,962.64 -2,166.50 3,216.03 5,968,429.157 645,803.364 9.79 -1,701.92 13,294.74 91.10 282.12 9,032.01 8,962.21 -2,158.35 3,182.72 5,968,436.670 645,769.907 9.73 -1,677.15 13,314.87 92.00 281.20 9,031.46 8,961.66 -2,154.28 3,163.02 5,968,440.361 645,750.128 6.39 -1,662.11 13,338.38 89.17 280.40 9,031.22 8,961.42 -2,149.88 3,139.93 5,968,444.326 645,726.960 12.51 -1,644.32 12/26/2019 9:42:49AM Page 19 COMPASS 5000.15 Build 90 12/26/2019 9:42:49AM Page 20 COMPASS 5000.15 Build 90 BP t_ p Baker Final Survey Report Hughes Company: North America - ALASKA - BP Local Coordinate Reference: Well J-17 Project: PBU TVD Reference: J-1 7D @ 69.80usft (Nordic 1) Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Well: J-17 North Reference: True Wellbore: J -17E Survey Calculation Method: Minimum Curvature Design: J -17E Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,370.40 88.53 278.49 9,031.86 8,962.06 -2,144.62 3,108.35 5,968,448.978 645,695.291 6.29 -1,619.60 13,400.82 90.55 277.46 9,032.11 8,962.31 -2,140.40 3,078.23 5,968,452.625 645,665.096 7.45 -1,595.62 13,431.09 95.30 276.31 9,030.56 8,960.76 -2,136.78 3,048.22 5,968,455.677 645,635.031 16.14 -1,571.45 13,464.14 97.11 275.43 9,026.99 8,957.19 -2,133.42 3,015.54 5,968,458.416 645,602.293 6.08 -1,544.82 13,491.71 99.09 276.72 9,023.11 8,953.31 -2,130.53 2,988.40 5,968,460.787 645,575.106 8.55 -1,522.76 13,517.03 100.51 274.62 9,018.80 8,949.00 -2,128.07 2,963.57 5,968,462.781 645,550.239 9.91 -1,502.50 13,550.23 104.36 277.38 9,011.65 8,941.85 -2,124.68 2,931.34 5,968,465.550 645,517.948 14.15 -1,476.27 13,582.15 104.84 274.47 9,003.60 8,933.80 -2,121.50 2,900.62 5,968,468.154 645,487.175 8.95 -1,451.26 13,609.04 105.56 272.44 8,996.55 8,926.75 -2,119.93 2,874.72 5,968,469.227 645,461.252 7.76 -1,429.61 13,640.38 105.27 269.80 8,988.22 8,918.42 -2,119.34 2,844.52 5,968,469.243 645,431.045 8.17 -1,403.75 13,670.40 105.14 268.36 8,980.34 8,910.54 -2,119.81 2,815.55 5,968,468.227 645,402.096 4.65 -1,378.44 13,701.38 104.97 265.25 8,972.29 8,902.49 -2,121.47 2,785.68 5,968,465.993 645,372.270 9.71 -1,351.74 13,720.26 104.77 264.35 8,967.45 8,897.65 -2,123.13 2,767.51 5,968,463.994 645,354.133 4.73 -1,335.17 13,758.00 104.77 264.35 8,957.83 8,888.03 -2,126.72 2,731.20 5,968,459.712 645,317.895 0.00 -1,301.93 Projection to TD Design Annotations Measured Vertical Local Coordinates Depth Depth +NIS +E/ -W (usft) (usft) (usft) (usft) Comment 10,174.20 8,396.13 -980.35 4,481.13 Tie in point 10,270.00 8,458.77 -978.73 4,553.59 KOP - Top of Whipstock 10,290.25 8,472.15 -978.51 4,568.79 Interpolated Azimuth 10,320.41 8,492.96 -978.89 4,590.62 Interpolated Azimuth 10,350.09 8,514.64 -980.06 4,610.84 Interpolated Azimuth 13,758.00 8,957.83 -2,126.72 2,731.20 Projection to TD 12/26/2019 9:42:49AM Page 20 COMPASS 5000.15 Build 90 c_ N 7 O O S m C_ L O Z WELL DETAILS: J-17 WELLBORE DETAILS: J -17E REFERENCE INFORMATION by Project: PBU Site: J Ground Level: 39.10 Parent Wellbore: J -17C Co-ordinate (WE) Reference: Well J-17, True North Baker Well: J-17 Northing: 5970534.000 Te on MID 10174.20 Vertical (TVD) Reference. J-1 7D @ 69.80usft (Nordic 1) Hughes J -17E Easting. 642547.000 Section (VS) Reference: Slot - (O.00N 0.00E Wellbore: Latittude: 70° 19' 37.301 N Measured Depth Reference: J -17D @ 69.SOusft Nordic 1) Design: J -17E Longitude 148° 50'38.216 W Calculation Method: Minimum Curvature AO - Offsetswithin 506' Easting (800 usft/in) 642800 643200 643600 644000 644400 644800 645200 645600 646000 646400 646800 647200 647600 648000 648400 648800 649200 649600 642800 643200 643600 644000 644400 644800 645200 645600 646000 646400 646800 647200 647600 648000 648400 648800 649200 649600 Easting (800 usft/in) B 10.1 RES North America - ALASKA - BP PBU J-17 J -17E J-1 7E 500292096905 AOGCC Offset Well Report 26 December, 2019 Baker ��-µ= Hughes BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 J -17D @ 69.80usft (Nordic 1) J-1 7D @ 69.80usft (Nordic 1) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Baker S Hughes Reference J -17E 0" b p NO GLOBAL FILTER: Using user defined selection & filtering criteria 1144e MD Interval 25.00usft Error Model: ISCWSA Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-17 Well Error: 0.00usft Reference Wellbore J -17E Reference Design: J -17E BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 J -17D @ 69.80usft (Nordic 1) J-1 7D @ 69.80usft (Nordic 1) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Baker S Hughes Reference J -17E Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum centre distance of 500 Error Surface: Pedal Curve Survey Program Date 12/26/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 92.82 8,892.12 J-17 Srvy 2 GyroData (J-17) GYD-CT-CMS Gyrodata cont.casing m/s 8,931.00 10,174.20 J -17C Srvy 1 MWD+IFR+MS (J -17C) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,270.00 13,758.00 Survey #1 (J -17E) MWD MWD - Standard 12/26/2019 10: 12 17A Page 2 of 4 COMPASS 5000.15 Build 90 UbpsU0,111,BPAnticollision Report Baker Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 Project: PBU TVD Reference: J -17D @ 69.80usft (Nordic 1) Reference Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Site Error: 0.00usft North Reference: True Reference Well: J-17 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J -17E Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: J -17E Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) EX PR331213 F HURLST J J-01 - J-01 - J-01 4,218.71 4,075.00 65.52 J-01 - J-01 A - J -01A 4,205.80 4,075.00 64.87 J-01 - J-01 B- J-01 B 4,205.80 4,075.00 64.87 J-01 - J-01 B - Plan #7 4,220.89 4,100.00 65.89 J-01 - J-01 PB1 - J-01 PB1 4,218.71 4,075.00 65.52 J-02 - J-02BPB1 - J-02BPB1 12,311.96 10,550.00 499.63 J-03 - J-03 - J-03 3,683.54 3,650.00 236.50 J-05 - J-05 - J-05 4,028.52 3,775.00 465.08 J-05 - J -05A - J -05A 4,028.52 3,775.00 465.08 J-05 - J-05APB1 - J-05AP131 4,028.52 3,775.00 465.08 J-05 - J -05B - J -05B 4,021.21 3,775.00 464.98 J-05 - J -05C - J -05C 4,021.21 3,775.00 464.98 J-05 - J-05CL1 - J-05CL1 4,021.21 3,775.00 464.98 J-06 - J-06 - J-06 4,330.18 4,100.00 428.85 J-06 - J-06PB1 - J-06PB1 4,330.18 4,100.00 428.85 J-07 - J-07 - J-07 4,416.82 4,100.00 490.70 J-07 - J -07A - J -07A 4,413.51 4,100.00 490.44 J-07 - J -07B - J -07B 4,413.51 4,100.00 490.44 J-07 - J -07B - J -07B WP04 4,413.51 4,100.00 490.44 J-08 - J-08 - J-08 4,406.03 4,325.00 63.59 J-08 - J -08A - J -08A 4,722.11 4,425.00 242.66 J-08 - J-08PB1 - J-08PB1 4,405.94 4,325.00 63.39 J-11 - J-11 - J-11 3,887.91 3,975.00 88.03 J-11 - J -11A- J -11A 3,886.40 3,975.00 88.13 J-11-J-11APB1-J-11APB1 3,886.40 3,975.00 88.13 J-12 - J-12 - J-12 4,668.41 4,375.00 200.69 J-14 - J-14 - J-14 2,434.71 2,475.00 268.90 J-14 - J -14A - J -14A 2,434.71 2,475.00 268.90 J-15 - J-15 - J-15 2,389.18 2,425.00 58.43 J-15 - J -15A - J -15A 2,389.18 2,425.00 58.43 J-15 - J-1 5B - J-156 2,389.18 2,425.00 58.43 J-16 - J-16 - J-16 3,308.05 3,350.00 106.16 J-16 - J -16A- J -16A 3,308.05 3,350.00 106.16 J-16 - J-1 6B - J-1 6B 3,308.05 3,350.00 106.16 J-16 - J-16BP61 - J-1613PB1 3,308.05 3,350.00 106.16 J-17 - J-17 - J-17 11,309.04 10,925.00 58.67 J-17 - J -17A- J-1 7A 9,207.57 9,225.00 49.47 J-17 - J -17B - J -17B 9,207.57 9,225.00 49.47 J-17 - J-17BPB1 - J -1713P81 9,207.57 9,225.00 49.47 J-17 - J-1 7C - J-1 7C 10,488.68 10,500.00 47.90 J-17 - J-1 7D - J-1 7D 10,488.68 10,500.00 47.90 J-17 - J-1 7E - J-1 7E WP 11 13,208.33 13,125.00 22.47 J-18 - J-18 - J-18 417.01 425.00 114.07 J-18 - J-1 8A - J-1 8A 417.01 425.00 114.07 J-21 - J-21 - J-21 4,256.88 4,150.00 341.91 J-23 - J-23 - J-23 4,401.40 4,250.00 418.45 J-23 - J -23A - J -23A 4,404.47 4,250.00 418.46 J-25 - J-25 - J-25 2,667.16 2,675.00 79.70 12/26/2019 10:12:17AM Page 3 of 4 COMPASS 5000.15 Build 90 '•"�' b BP p Anticollision Report Baker s Hughes Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-17 Well Error: 0.00usft Reference Wellbore J -17E Reference Design: J -17E Summary Site Name Offset Well - Wellbore - Design J J-25 - J -25A - J -25A J-25 - J -25A - Plan #6 J-26 - J-26 - J-26 J-27 - J-27 - J-27 J-27 - J -27A - J -27A J-27 - J -27B - J -27B J-28 - J-28 - J-28 J-28 - J -28A - J -28A J-28 - J-28AP81 - J-28APB1 J-28 - J-28PB1 - J-28PB1 J-29 - J-29 - J-29 J-30 - J-30 - J-30 J-31 - PLAN J-31 - J-31 WP04 JX -02 - JX -02 - JX -02 JX -02 - JX -02A - JX -02A JX -02 - JX-02PB1 - JX-02PB1 Plans: Gwydyr Development (SHL) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 J -17D @ 69.80usft (Nordic 1) J -17D @ 69.80usft (Nordic 1) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 2,667.16 2,675.00 79.70 2,667.20 2,675.00 79.70 1,742.78 1,750.00 36.43 2,967.08 2,975.00 24.99 2,967.08 2,975.00 24.99 2,967.08 2,975.00 24.99 3,045.24 3,050.00 20.24 3,036.84 3,050.00 24.78 3,036.84 3,050.00 24.78 3,045.24 3,050.00 20.24 1,640.78 1,650.00 147.28 2,663.02 2,698.00 341.79 830.53 850.00 269.62 3,771.44 3,675.00 396.26 3,778.67 3,675.00 396.38 3,771.44 3,675.00 396.26 12/26/2019 10: 12 17A Page 4 of 4 COMPASS 5000.15 Build 90 Remarks WELL NAME IJ -17E CEMENT REPORT Date : 1/1/2020 Shoe A 13758 Hole Size: 4.25 FC A : 13745 Casinq Size : 2.875 Top Liner A : 10133 Preflush (Spacer) Type: N/A Density (ppg) : Volume pumped (bbls) : Lead Slurry Type : N/A Volume (bbls): Density (ppg) Yield : Sacks : #DIV/0! Mixing / Pumping Rate (bpm) : Tail Slurry Type : Class G Volume (bbls) : 44.3 Density (ppg) : 15.3 Lu Yield : 1.31 Sacks : 189.8643893 Mixing / Pumping Rate (bpm) : 1.5 Post Flush (Spacer) Type : N/A Density (ppg) : Rate (bpm) : Volume: Displacement : Type : KCI Density (ppg) : 8.33 Rate (bpm) : 1.5 Volume (actual / calculated) : 21.0/21.5 FCP (psi) : 1411 Pump used for disp : Rig Plug Bumped? X Yes No Bump press : 3275 Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job : 94 Cement returns to surface? Yes No Spacer returns? Yes No Vol to Sur: Cement In Place At: 0.25 Date : 1/1/2020 Estimated TOC: TOL Method Used To Determine TOC : Circulated cement off TOL Volume lost during displacement (bbls) : 2 after cement exited shoe Remarks THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU J -17E BP Exploration (Alaska), Inc. Permit to Drill Number: 219-156 Surface Location: 801' FNL, 1806' FEL, SEC. 09, TI IN, RUE, UM Bottomhole Location: 2944' FNL, 842' FWL, SEC. 10, Tl 1N, R13E, UM Dear Mr. Mclaughlin: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, �Trice Chair DATED this day of November, 2019. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMISS' PERMIT TO DRILL NOV 0 E ? 1 20 AAC 25.005 la. Type of Work:1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil Q' Service - Wnj ❑ Single Zone Q Coalbed Gas ❑ Gas Hydrates ❑ Redrill Z • Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket Q' Single Well ❑ 11 Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 , PBU J -17E Address: 3. 6. Proposed Depth: TVDss: 8890' 12. Field/Pool(s): P 0. Box 196612 Anchorage, AK 99519-6612 MD: 13758'' TVD: 8960' PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Governmental Section): ( ) 7. Property Designation (Lease Number): ADL 028281 - Surface: 801' FNL, 1806' FEL, Sec. 09, T11N, R13E, UM 8. DNR Approval Number: 13. Approximate spud date: Top of Productive Horizon: 1779' FNL, 3438' FWL, Sec. 10, T11N, R13E, UM 85-24 January 1, 2020 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 2944' FNL, 842' FWL, Sec. 10, T11N, R13E, UM 17290 41b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.80 feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 642547 y- 5970534' Zone - ASP 4 GL Elevation above MSL: 38.20 feet 23 16. Deviated wells: Kickoff Depth: 10268 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 105 degrees Downhole: 3278 • Surface: 2384 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling MD TVD MD TVD(including stage data ­_Length 4-1/4" 3-1/4"x2-7/8" 6.6#/6.5# 13Cr85 STL/TCII 3638' 10120' 8361' 13758' 8960' 215 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): 1 Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 13498 9016 12393,12460 12393 9029 12670,13445 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 8 cu yds Concrete 33-113 33-113 Surface 2646 13-3/8" 1856 cu ft Arctic Set III & II 32-2678 32-2678 Intermediate 8901 9-5/8" 2360 cu ft Class'G', 132 cu ft Permafrost 30-8931 30-7551 Liner 1460 7" 348 cu ft Class 'G' 8774-10234 7429-8435 Liner 1668 4-1/2" 337 cu ft Class'G' 10067 - 11735 8325-9032 Liner 2506 3-1/2"0-1/4"x2-7/8" 117 sx Class'G' 1 10979 - 13485 1 8918-9016 Perforation Depth MD (ft): 11990 - 13380 Perforation Depth TVD (ft): 9036-9020 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch Z Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 21 Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Ciolkosz, Rvan R from without prior written approval. Authorized Name Mclaughlin, Sean M Contact Email Ryan. Ciolkosz@bp.com Authorized Title Engineering Te ead - CTD Contact Phone +1 907 564 5977 Authorized Signature Date i ' Commission Use OnIV Permit to Drill �% API 50- 029-20969-05-00 Permit Approval Sege cover letter for other Number: ! tC : Date: Z re uirements: Cohtions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methgne, gas hydrates, or gas contained in shales: E Oth(5p f C- 3���5 Samples req'd: Yes ❑/, No Mud log req'd: Yes El No Q \ .e TO 2,61+A,- 1+ H2S measures Yes Q No ❑ Directional svy req'd: Yes ©/ No El uC �\ou ev-.Qldspacing exception req'd: Yes El No C4f/ Inclination -only svy req'd: Yes ❑ No li� Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY ` Approved \ COMMISSIONER THE COMMISSION Date: (\ by: u 4e�RzUTA�� • L. < < Z ( {I permit Gs � Iakv[:C(9)) Form 10-401 Ref"5�/Y017 ghi5 ermit iS valid for 24 mOntO h t 25.005 SubmitFrom and Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission OP From: Ryan Ciolkosz - CTD EngineerFg' Date: November 6, 2019 Re: J -17E PTD Request Approval is requested for a permit to drill a CTD sidetrack lateral from well J -17D with the Nabors CDR2 Coiled Tubing Drilling around January 2020. Proposed plan for J -17E: The sidetrack will be a -3490' horizontal CST that will kick -out from the parent in the Sag River. The CST will establish offtake in Zone 1B/2A. The sidetrack will be drilled on or around January 2020. During pre -rig work it is proposed to set a 4- 1/2" packer whipstock at a kickoff depth of 10268' MD. CT will mill a 3.80" window pre -rig. The rig will move in, test BOPE and kill the well, and drill into Zone 1B. The proposed sidetrack will be completed with a 3-1/4" x 2-7/8" L-80 solid liner and cemented in place. The rig will perforate -1000 ft The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre -Rig Work (scheduled to begin Nov 15th, 2019) 1. S DMY GLVs, Pull IBP stop, Drift for whipstock 2. EL Set CIBP/ Whipstock 3. F MIT -IA. A/EL: Displac well to brine/FP. Pressure test CIBP 4. C Mill Window — S$ 5. V Pre -CTD Tree work_ 1. 2. 3. 4. 6. 7. 8. fork (scheduled to begin January 2020) MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2384 psi). p Drill production section: 4.25" OH Run 3-1/4" x 2-7/8" L-80 liner to TD. Pump primary cement job: 44.4 bbls, 15.3 ppg Class G, TOC at TOL (10120' MD)*. RPM Log and perforate wellbore. 2" Maxforce guns planned (^'1000', 6spf, planned). Freeze protect well to a min 2,200' TVDss. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(1) Post -Rig Work: 1. V: Valve & tree work 2. SL/FB: Set LTP if needed. PT LTP. Set KO GLD. 3. T: Portable test separator flowback Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (627 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, STL, 13Cr solid liner: 10,268' MD —13,758' MD • 3-1/4", 6.6#, TCII, 13Cr solid liner: 10120' MD — 10258' MD • A planned 44.4 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 12120' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safetyjoint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 105°, inclination at kick off point is 48`. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 17290' • Distance to nearest well within pool — 23' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • GR/CCL/RPM cased hole logs will be run inside the production liner. Perforating: • Perforating: 1000' of perforations, 2", 60 deg random phasing, 6 spf, perf guns. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. - • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • J pad is not an 1-12S pad. Max recorded H2S reading on 1-17: 20 ppm on 4/26/2019. Max H2S recorded on the pad: <100 ppm. • Two potential fault crossing at 11478' and 12245'and low Lost circulation potential. • Lost circulation risk is considered Low. Reservoir Pressure: • The reservoir pressure on J -17E is expected to be 3278 psi at 8944' TVDSS (7.05 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2384 psi. • A min EMW of 8.4 ppg for this well will provide 627 psi over -balance to the reservoir. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka 564-5977 I Cl) r. a O J CL a T W W .- z • a U z Q U Q O O z a � � W ID OD Z tp U dE LO m 3 0 ca F- 0 c ai C 0 O aa± ai co0 0 c =° E = 2 2 w p z°c'nc E p E Un V V d O C w c N O oW = N h d O W a N V Q CL d Y Y d Q Q N N N m CL N d a a ¢ O o Z co �o 0 az z m E y O N p N d IL a = Qm Y z p Q w V m ° a � 3 N oo m g n m z a (L r C d Cjyl � p C ,G OI 0 00 M c CL 3 3 o E p E Un V V d O C w c N O oW = N h d O W a N V Q CL d Y Y d Q Q N N N m CL N d a a ¢ O o Z co �o 0 az z m E y O N p N d IL 0 rn a m LO O Lo O U o, CL z �: = z p 0 V m ° o N N O O 00 r p 0 M M M N W O LO � 0 3 o O H 0 o > J .W�.- iiim > 7 > d d 4) « C W v d > 0 w O o 'rn V c Cl) J J C7 C c t0 0 n 0 z w m r � � � v e' v d � o LL N o p O N W O NN N z W O ? o _� ` O V L6 O 7 J Q N N � N cO O O OD O O 0) W p p� co V I-� M O LO cl) It 'o d O N r co rn o C Q "- S O. 0 rn a m LO O Lo O U o, CL p L d p � 0 3 o O H 0 o .W�.- iiim > > d W v w c c C c t0 0 z w m r � L m e' zo w o z W O ? o + Z S n O 0 N c 7- d cn ; O W W F 0 a E W d N h Q LL M O O O d � 0 0 0 co 0 LUo z z n T m CI- a o U) ; 'z w c c p C O ym C v d M Hto d p Q 3 3 3 o m in a° a° a' >> 0 rn a m LO O Lo O U o, CL O O O O O M N N O N O O O O O O IO Cl) M O O V M Cl) N W N N N N N t0 m m W m W V j m Z O U) d O m O m (l- m � N m n m O m m O O O IO m (- m W a zm O � N n m N O .-. Q Cl) V V V' V' V' f- V n V m V N M In (�D r7 m M M M Cl) M M M M Cl) M C M M p N a a d m N Y N O 0 W O @ O m Z Q O O m m m m m m m m O O O O O O O O O O O O O O O O @ ai U O O O O O m N N N N N N N U E LO a 00 N I- co m N co V N M t0 O m O V W O 1� m V Cl) (n m N to M N m m m m (, t0 NInO O tD C In O)O N O m O m r W — M W O V' O m h O N (n W O m m O CD N W C =�y V V V V V N N N Cl! m m 7 m m m W m V W V m V m V m V m V W V m V m j IL c U U uO n m C O ` it C C V M O m m m V N O V' V' m C 41 + W y O O O m N V O N m (O m V m In m O M m m O m m co N 1 w V E N W m m N N N N (n V U) U) 01 M M V' V V V V' V' V' M M O W Cl C co m m m m m m m W m m (D W m N G' m t6 m m m m m m m m W m m m W m m m m m m m m of m m m z 0, D v g E 0 m m m (n rn C CD m (n m (3 rn m c + + -m z LO U (n L In m Lo U 2 L O LL LL O U Q Cp + + M N m (- N to t0 ifl N O m V D 0 (n V N O m m m N LO m m 0 0 D T CD 2 m O M (n (O (n N In LO n in M (n (n W M V m m V m O O r V a m 3 U U U 3 m m n (N U) U) M m m m N m 1� m m (n '1 U? m N m 0 m O o W O m m co m m m m m m N N N M 0 U+ + 0' Q' m O> (- m r m N m N m n m r m r N m m N Z C)+ + u, m m m mO O 17 a M Cl) M O O O O I- m In m O O r- m m M O O O (O m O O m N M V' O N 1- m r- m O O r O m O m N N W m m m m Cl) m U CO co CO m M co M (o (h m V' .0 V_ m V co V co V co V (o In m In m � O w �O 7 + w w 3 1p LL l0 m M m V' m IO N N f- f- V 1� N m N IO N l0 ++ Z Z o5 5 m m m m m m m m m m m m O m O m M m V O m o M CN m N N ^` m ? C', m Z to N m > > CO U W W 2 r- N N N = v, M r r- m V' Cl) m (O m O V' O m 0 m Il- Cl) m m M m O (n W m (D N N O (mV 00 V co V (n V ai V of V (o V' (� V (o V' (h V o V' o V N Cl) n M (0 U ^ W 0 �' N V m m m rl co IO m N I� G O .� Q rC Zr-- 0 m - 5 z d d N0N0 o 0 V O N O O O W m m O o0 of O N O O m r N IL = 0) N O N It N m N m N m -O m O MMV'V N O O O NIO N m o oU) O O o O o c o o 0 0 0 y o o N LL �. .O V F H Y Y W F V F O E z ® ® w 7 A N O 0 m jJpUi O m r m V O co N O v O N M V In v to O OD T r- CO d' O (D N v O co r- 0) O OD m O M N O (O w m O N O ' L m r, r— m (D (n (O v v v v v m m m Cl) rn m m yL m Y � Cox 0 LO U) CO a Q. U (O N N m Cl) (D M O (O t` 0) n (O r- r- r n m r- N m O v h (n co O O O OD (D r- CD (D � (O O r- O N m (D v OD co m O O (O O O O m O Cl) m OD f� v r- m N N (D O Cl) r z z (O (O tO N m (O tO v v v m m Cl) N N N U .-. Q m M M m m m M m M m co M m Cl) m m co co M O O z a � m m U) J Y CO ZQ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O J Oj J t0 0 U Y N � N � N .- N � N N N C N � N N N N N r N r N N .- N N U) dU E LO p) w J � O j N y t, :DE p .. V .Q C O (D mv N O c C M m N Cl) r— co v m aV (O v v Cl) O O m CO (() Cl) O O v Cl) (O O 10 (O (O (O co m (D N co (O M v IT Cl) v v M v r- It O M M 0) r 0) N N m O O (D (0 O m Cl) v O m (O N 0) (O v co (O N N N v u7 N v N m N v N N co m O O N (D OO m r m ® m � �' ru v A O o v CO v m v (D v (D v v (o (D v (D v m v m v m v m v (D v (D v m v to v co v m C W V O q a O m N O m CO W N v r- N CO O G@ C V y) (O � r (D v M N m m co y N � m m v y O M � N N v m Cl) m m (D (D r' 0 O O v (D U (o m rl- co ri r` (0 0 o v n (o U W t® m n C (O LO (O N O (0 v v m (D v m O m O M fD N m N m '- o CO O N Cl OD m t„ Z u D p m $ O m O m O m O m O m m O O m co m O m O m O m O m O m O m O m co m O co O O?? O W J F 2 w O O m m m m m m m m m m m m m m m m m m z (n (ri (n (n (n vi (o LO In () U) (n (n vi (n (n (n O 0 Cl- CO OD r- N N O m t` to m N Cl) co O m m v O (O r- IT r- r— r O N v m (O (D (O v N r- m O (D N v m M (O m O co co O O v f� O P- r r- r— r- OD r— CO m N r` u0 r h rll� (D rl-W O r co n co (D co (D n (O co (D m (D (D H 0 U d (D tO (O v OD (O N (O O v a0 O 0) m O m W m m Cl) O O (D O OD m (O m — m r- (O r� r N m N r f� OD f- v N co N m O (O Cl) (O M O O O (O N V) N m v m aD m N V (O (O_ (O Cl) (O m (O v (D Q _ _ _ _ m a z r— m (D co (Q O w O o M (D to a0 N v N N OD O O (D N N M Y) N co CO r- m O O O O m r-- m v � co N co r N OD v m 00 O O N m m co fl- r- OD m m ao O O O N m 00 co (O (O M m .0 N m O (O m c0 O O r-� (O m OD O O (O (O m co O O (D m m v Cl) (D (D m m (D (O O h m N ?O F N O m m (D (D (O N m r— O m m Cl) O M v Q E,. N co v r� O m O Cl) m (O (O m M m r` m (O r aD M v m v m O N No m (O 0 N co M N M N N N 0 N M 0 N d QCD Y (n O 00 N O O O O co N M v (D v 00 O O O Q J v N O N O N M v m m M m m m O O O O Q m M m m N v N It co v OD N v (O M m c0 m (D m O N r— N OD N OD Cl) N (O OO (O 00 (O c0 Wu ... 3 0 m g n z 4. O m O m O (O (D O (D O m O O v m (D O (D g M O m O m O lll� O O O r� O O Cl) N v O v NT O O co O m (D J O O r v N O O J OD O r- m OD m m O O m O O N m O O O O N (O O O O U r O O N O O N m O N co N N O O M 00 v m N ' F � Z Q ((Cpp = F' m N N N d i to 0 m wwk b "� G .. w C N e0 O 0 IL c1) a 0 0 0 n O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C) m 9 o o 0 0 r of n 0) O o O 0 o 0 0 0 O 0 o o 0 o 0 0 o 0 O o o o 0 o 0 0 0 o O 0 Cl o o o a I? m m m m (n m m m m m m m m m m rn rn rn rn m m � m Co 2 F o 0 co (n m m n o N m m N V r O n m m m o m v (O (n n m (O m (n CO m m m m m m (n (n m (n a Uco m of m o v m r- m o ro o n m LO (O of m 'o m Ln m w m w r w m r` m m co (o m v m m of m r - o Z Q c `� M c] O mM O O 0 M O M m N m N r N m N (n N V N m N N N N N N N N O N O N m m U v D N M O V 2 a m N a) O (0 O O O O O O O O O O O O O O O O O O O O O O a) m Q O O O O O O O O O O O O O O O O O O O O O O J 6U M CO N N N N NN N NN N N N N N NN N N NN N N n VE L 7 d' p� 7 O m N N 7 C 2 0 CO Gt N (n N m V V co m r r m r V (h (n O m O r r m N m m N O O m m9 (n m m n O m r V 0 (O M m m On NV m r V Lo N m O O N m m O V m U C ca C C R, n — r n n (O .- r V n V V V r n r O N O V m 10 m r (VD m m n V V m r N O NO ® W v m v m v m v m r v co r v m n v m V CO r v (D n v m m v m m v m m v m m v m m v m ID v m m v m ID v m m v ID m v m m v m m v m K v Wca �+ C C C U 3 ` C V n m m m (O r N N m N m N m O r Cl) N r N m r m m m (O m V v N t0 r r O r m V m m O m Vm A (D m m m m r CD m m N r 0 O V 0 O N O N m CY 47 Q' T W rA cm7 M m m m V M m V to O LO N 6 O N cm V 'n 6 m m co co(rD 4 r- Q' m C m m m m r r". r m (O V V M m m m m m Cl) Cl) M m m i.7 Q Z m CO m mm m m m m m m m m mmm m m m mmmmm m m m m CO mm m m mmm m m m m m mm m D Z N N LO N u7 In (n (O (O tf1 tO tO Ln N In (O Lo (O tO (O (O O d m m m n m V m O N m m m m O m V O (O u7 Cl) a) ry m V (n Cl) m O m co �' O O m Cl) m r m N m m n O (O V (O O m V m Co. . m m N r m V m r O m m (O m (O m (O m (O to (O m (n (n tO Cl) tO m v m V (n M r N r r O n m m m m m m n m m m m m V a 2C m Cl) Cl) m m m m Cl) O U d Nm m ID m m (n m m V in n r m Cl) (n o 0 m N (n m m V m N (O m m n (n V r O N V m m m V V mm (D O N m N m N m m m m N v m m m h m m m m m r m n N m r m m m m m r O (n N m N m N O m m N 0 N (O N N N � N N N N N N N y7 7 7N N N N N N N N N N N N N N U) w m to N r m co V m N n m m W (n O r m m Cl) n (D m m co V m m m ao V r m (O m eo V r m (O m m V r m (n m co V r m (n m co V n m cr m OD V n m (O m 00 V r m (O m co V n m m cl .0 V r m (O m 00 V r m (O m ao V n m (O m eo V r m (O m m V r m (O mm m V r m (O m v n m (n m m v n m (O m 00 V n m (O m co }p F (n v (n m o m (O (n in (n (D (D (n (n (n m m (n (n V m m N m m (n (n m m m m (O m m m m m N r m N m m N r N m N 04 N (O m N N r N N N m (n N N r N N m m N Cl V m N In m m N In m N �n m m N r O m N O V CO N O m t- N a m o o m Cl) o 0 0 o 0 O o o 0 0 0 0 0 0 0 O 0 o 0 0 0 0 0 0 o 0 O 0 O 0 o 0 0 0 o 0 O 0 O 0 Q o m o m vi m (ri m ul m o m 0 m 0 m 0 m o m o m o m 0 m o m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m Q -S D F.- O m g n Z a- a (Y.lda v (n o o r m o o r m v r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o v r O O O O O O v n o O O o CL A m O V O v N O O O O O O O O O N O O O N O O N 0 Z mO Cl) V V V O (D V (O m (O O m O r O m O cr O O O O N O m O V m V O (O O m O r n r O m O m LO = o f � � 7 co m C. N N .N-- N N N N N N N N m m c o 0 C N Iia 033 a a 0 � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o N v co v m M o o a j OO O m O O O m O m O m O m N M N M m CO co 10 m LOto ' m m � Y to — m = H g O LO U) C13 d M v N v O O W n W W W W W W N O W tO N N M v m W g U Cl) O n m W N O Cl) GWD W r N Z W W n cc W N N N M M N N V ¢ V O M M o p z a p m tNp O O O O O O O O O O O O O y Co Z¢ 0 0 0 0 0 0 0 O o 0 0 0 O N N N N N N N N N N N N N G m ¢mi �_ r Ft LL, ... m u .8 C W vv ao N cy W N m to N Of O n W v W W W O m 0 W n W mW O r; W W n v N W n W N W N N tri n N V t0 co co W Q_ N n v Nto 14i W W M W W tri m Cl! N O o 'It N y. w b U) v 9 co N v co N v W N co co N v co N < W N v W N v co N V W N v W LO V co N v W N v W m � � C ® O m ' Q V U c 3 C V r m v W N W N O N Lf) O Cl) W O n to v co W W W M O) C f1 w R )O W N CO W N W M Co M i h V o d N v LO M M w a' Of v V M en{ iO iO V' 4� co W W W W W co W W W co W W W W W co W W W W W co W W (D > o o w i'- Z N D 0) L6 m N rn N m L6 m N rn N rn N rn N rn N rn tO rn N rn N rn N 0 O Q 0) N v W Cl) m N Cl) Cl) Cl) W m (P n m N N O W O O O) 'V n mm m O O_ n W O O n W O n Cl) u) O W O M N M M N Cl O m m W cc n W CL C CO M M M Cl M M N N N N N N m � O U a O m IT co a W N v O N N co m V M O O W m O 17O O) W v b N O co W m W n IT N V m '! co N W N N N v V M Cl) �! N m N N N N N N N N (V N N N N p. Z � v n tr N N rn co v n m N rn W v n of N m co v n 0)0) to m co v n N 0 W v n 0) N m co v n 0) K) m co v n" Oi M 0 W Mn Cl) N O ao r.M (3) Cl) rn W o Cl) C tp W o tri O m ro o 0 o O) W co N y© F N O WW M n n n nW N W M M v m O O W N a M w 00 v m co co ro n v W o W uo W o n m n OD r- n v (D r- N N N N N N N N N N N N N N Q a m Y U) O o O O O O o O W O O O O ¢ J O O O O O O O O N O O O O ¢ O m O m O m O m O m O m O m O m W m tO O tO O N O tO O 11J Q j Lil C :)N zn g O) 0 0 o O v o v o Cl) o0 m N r EL o O N o O 0 O o O n N O O n N o O N co 0 O o O N co q N a 2 O O N O O O N O Cl) Cl) M O v V' O N CO LO O W O n N n R ' 3 M M M M M M M M M CN Q- ro (71 � w uain33o a � E U z Q U Q O O O � z a r to _ N 3 Y 3N O O O R (Dw 2 toCD m Uy E to a� 'c C) m Q o w rc � � c m � c tmi o CD `me m 8 m►��'to n m m o o o J 2 2 M O 0 tp pp C y� C m O N O 10 N c m Er E a a o m V H O W V � m r - m O O — N - V m m F -- r- n N N O m M m V V m m t0 m M m O t0 O O m m O V m N m m N O N f� m mV O V O m V t` f- M v_ m m Ln Ln Ln m c� M o m m m mfA ! V V V V V V V V V V M M M M N N N P W C O O U m f� V n m m N m m m o m m V m jp M r- N N m M m V m M N m M m V O m m m m O N m r- m N m m m M V m M N rl- N N m m m m to m m n m m N N tl! N N N N N N N { M r, m m O m m m V V V VV V V O M m m M Un to m m r- r- r- r -r- r` o f6 L m rl O m O O N O .-- m m m m m m m O 0 N CO O N m r- m m In m t[) LO M m mG p V m m m m m m m m m m m m m Cl)M V a" N w m m m N c0 w w w m co m m m c0 w O O O O m m V r� f` V V V V V V M m N O O O V V co m m r- rl- r� r- rl r- N N LL. Rte" n m w N N V m V V m m r � m N to � y� 4 jq N N M N M Cl) V m Ln V O ) V m r., North America - ALASKA - BP PBU J-17 PLAN J -17E J-1 7E WPI 1 Anticollision Summary Report 01 November, 2019 Baker Hughes tj Data 11/1/2019 a A pn Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-17 Well Error: 0 00usft Reference Wellbore PLAN J -17E Reference Design: J -17E WP11 BP Anticollisiion Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 Mean Sea Level J -17D @ 69.80usft (Nordic 1) True Minimum Curvature 1-00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference J -17E WP11 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,174.20 to 13,758.29usft Scan Method: Tray. Cylinder North Results Limited by: Maximum centre distance of 1573 Error Surface: Pedal Curve Baker Hughes Survey Toa Program Data 11/1/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 92.82 8,892.12 J-17 Srvy 2 GyroData (J-17) GYD-CT-CMS Gyrodata cont.casing m/s 8,931.00 10,174.20 J -17C Srvy 1 MWD+IFR+MS (J -17C) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,174.20 10,268.00 J-1 7E WP 11 (PLAN J-1 7E) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,268.00 13,758.29 J-1 7E WP11 (PLAN J-1 7E) MWD MWD - Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Sie Name Depth Depth Distance (usft) from Pian Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) F F-08 - F -08B - F -08B 10,555.55 12,701.00 671.53 420.43 258.47 Pass - Major Risk J J-02 - J -02A - J -02A 12,800.00 10,000.00 508.82 190.25 327.77 Pass - Major Risk J-02 - J -02B - J -02B 12,800.00 10,000.00 508.66 189.22 328.92 Pass - Major Risk J-02 - J-02BP81 - J-02BP61 12,800.00 10,000.00 508.66 189.63 328.51 Pass - Major Risk J-05 - J-05 - J-05 Out of range J-05 - J -05A - J -05A Out of range J-05 - J-05APB1 - J-05AP61 Out of range J-10 - J -10A- J-1 OA 10,230.28 10,665.00 787.76 177.60 690.39 Pass - Major Risk J-10 - J -10B - J-108 Out of range J-14 - J-1 4A - J-1 4A 12,900.00 11,774.00 1,273.42 568.95 730.20 Pass - Major Risk J-15 - J-15 - J-15 Out of range J-15 - J-1 5A - J-1 5A Out of range J-15 - J-1 5B - J-156 Out of range J-16 - J -16B - J -16B 13,758.29 10,000.00 558.82 204.68 364.28 Pass - Major Risk J-16 - J-16BPB1 - J-16BPB1 13,750.00 10,000.00 574.14 205.55 379.62 Pass - Major Risk J-17 - J-17 - J-17 11,277.74 10,875.00 26.03 15.52 19.49 Pass - Minor 1/10 J-17 - J-1 7A - J-1 7A 10,722.93 10,900.00 160.28 33.13 131.81 Pass - Major Risk J-17 - J-1 7B - J-1 7B 12,630.19 11,350.00 265.37 49.96 217.74 Pass - Major Risk J-17 - J-17BPB1 - J-17BPB1 13,052.74 11,616.00 376.00 89.72 292.17 Pass - Major Risk J-17 - J-1 7C - J-1 7C 10,485.17 10,500.00 50.90 0.59 50.90 Pass - NOERRORS J-17 - J -17D - J -17D 10,485.17 10,500.00 50.90 0.59 50.90 Pass - NOERRORS J-18 - J-18 - J-18 Out of range J-18 - J-1 8A - J-1 8A Out of range J-25 - J-25 - J-25 Out of range J-25 - J -25A - Plan #6 Out of range 11/1/2019 11:21:27AM Page 2 of 3 COMPASS 5000.15 Build 90 00 BP Anticollision Report Hughes 0##e 9 Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.00usft Reference Well: J-17 Well Error: 0.00usft Reference Wellbore PLAN J -17E Reference Design: J -17E WP11 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 Mean Sea Level J -17D @ 69.80usft (Nordic 1) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to J -17D @ 69.80usft (Nordic 1) Coordinates are relative to: J-17 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 * OGP-Usa AK ventral Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.09° Ladder Plot 1600 --- - - -- - -- - � ' 1200- 200 - -I---- - - -'-- I I - - - - -- - I I I I C) o C) ' - - - -i 12 M cn 800 - - - r --1- - - - -- I I � � I I I a-+ � 400 � I I U LEGEND 31213V1 ---- --- ----- - - - - -- - -- - - --- - - - - -- J-08,J-08PB1,J-08PB1 V3 I ------- - - - - -I $ J-21,J-21,J�21 V1 I 09, PLAN J-09C,J-09C WP04 VO $ J -22,J -22,J -22V3 di Notes), HU 0 2500 J-10,J-1960b10AV3 7500 10000 -*,2l§bbJ-23,J-23 V1 15000 J-10,.1-106,J-10MeVO J-23,J-23A,J-23AV4 asured Depth (2500 us�n) J -11,J -11,J-11 V1 ,4- J -25,J -25,J -25V3 VI J-11,J-11APB1,J-11APB1 V1 ffi c J-25,J-25A,Plan #6 V3 �n J -12,J -12,J -12V1 J -26,,1 -26,J -26V1 a J -14,J -14,J -14V5- J -27,.1 -27,J -27V1 3 V4 $ J-14,.1-14A,J-14AV2 J-27,J-27A,J-27AV3 - J -15,J -15,J -15V3 J-27,J-278,J-27BVO $ J-15,J-15A,J-15AV1 $- J -28,J -28,J -28V1 J-15,.1-156, J -15B V2 J-28, J -28A, J -28A VO B V11 $ J -16,J -16,J -16V5 J-28,J-28APB1,J-28APB1 VO J-16,J-16A,J-16AV2 J28,J-28PB1,J-28PB1 VO 11/12019 11:21:27AM Page 3 of 3 COMPASS 5000.15 Build 90 ys m 2 v L r0 WC d z_ c� 5 Z W> �� t O " m om E Is: M) 2c .❑ E ,@ c Z Si � pg W ccLu U L LL d d d K 0 O j @ 2 lC O� c LD o a V ppm w am ZZ LLN_ co Z. F Y C NO E� w n z N g Ur a ,o LD❑ ¢ gf w Lu I� m �Ju d 5 Z ppp m N O O ^ M N O�^aa O)�Ofi J ryONa �eepp ¢ mO^iQOQ w ❑,: icrn civ Lu J m �g�m IL CL u CL 30 -i600 -3400 -5200 - 5000 a c� �!9 (u!/Bsn 008) (+)4uoN/(-)43noS O N o � c O In0 z o m Z ca02 ¢FYa WQrnmm�m W �2 m O cM+�mm �i�imrrnrrrno Z ❑tONOMOON O O)Mmmmm W O Z �mtm+JONTTmm N��OYI�m W ¢ Fmm000Dmmmmm� OW www 4)GWpmm ❑000 oQ mmQ��Q QQQQr�W �N000 Q Qmm mn I�I�I�I�hNN V m v , N mO)'C V N N(V NtV NmG f�tDmW Q W W r�urnm�mUJ N N M N c2 M 0 100 .- I 'FjONI�Om mO�NmmNm�- W mtpD GD tWp e-f�O�c�p7pNW7m�pQ tO COU��W I� W �m W Ntit�10MO W 0®�rnfiMN c�o�4 oSoSSS$oS8SSos8 ' LLO 'O OmOGOOpO0000rnO0 F N�u7��P)c'�WmWWWWWIh� ®S W S O O O O O S S S S O 0 0 0 0 OO m N -N tOOm NO g�-n�NtOmN<V�M rn rn rn NNNNN in 0;m I . . . . . WnW nn po —WlapN (omp O�^nmYW1NNNW rnfW1�MmW ��QOD GO GWO OWDSSmWW00 [O mpWpm 'H m'-NI�WC]rntl rnOOmWWmmmmWQ ¢6)rnn f�Nl�(�1QNml%tOPc�nt7�t0 mmW �•-mrnnm�mmp Q�op aW {opo�n mmm�NN�Wmm NfVNN(nVNN cnW G' .gSgsBg00008 N S SSOC ll� 0�{ tn0 rrrrr rNN u�NmQ �(p fpm W O�Nt7Q�m1� O O o 12 O K a W m p i z z P,�aa n �'w33 aW o W w ONOpOrn fq y A_ E E N O N p ��moo 0 (ut/gsn OOb) gidaQ peaivan crus I a m w 3FUU� ¢ cU�$ �9Dr- 0-w O o@fie€ 9W UJ W E Q UM. SSi 8 z a n U) N 1- Otis N zHr O cov t/2 CO� a am m a ntt 0 m `c Y] O N O N O N O of N N (ui/4sn ooh) uogejedag ai}uao o; ej;uao O N o � N Q N O N co 0 0 O 0 — — � j I ' ; I i -- li, ' i i ail I I I O m r r f2 i — — I I II r r r I I I I I jI I i I E v 0 0 0 0 I O O I I I i I i I I II I I III I I I I I i I ! I I 1 I I I Y] O N O N O N O of N N (ui/4sn ooh) uogejedag ai}uao o; ej;uao O N o � N Q N O N co 0 0 O 0 O w LO IOA w N M n O O r r f2 r r r r r O O U E v 0 0 0 0 O n O O V N 33 )Sa&e�Rm2;g22g2;as � f $; $� ;] \( iL CL Ei 0 L i Y � m U p� ppZ Z g 00 ? O Fzm U ro E 7 � o� 2 c � E w 0 0 0 2 -2;-�� w >u P m mB 0 6v LL Q : i f w w�m nm b > M z3 m OM_ wMm�o�vr O m> F m c m m N 7 a w c- -i � z Q-» S 5 a` �o 1 4 4 O n to 0 n' 0 N 7 O m ID10 a a O a O 0 N n_ m v_ N C � o C) v m rn �C o mn_ c0 v W m O O 0 to 0 to N m _ m O M — O N ID to 0 N N — R N 0 _ w N Northing (700 usft/in) o ooi m m N m LO o 0 o rn m m m w rn rn m rn rn m rn m o voi w ID ID N I 1 (ui/4sn OOL) 6ulq:PON � N O j _I r )009 I O IL m QQQg' 0 p8 O it 0 I O N QQ� I DOL CL CO OOpy r i ZT i CON 0 f m m i N a- ° a U o a m S o o: �- 0005Lj 7 I I s i ! 0009 y� 0005 000 0 Q� OOh I I O 0o os I m Q' t 00¢ j o O] o "l b I i � I p O I p i Oit I X001 T i of o o0 i I O I LU 10o j 0 09 QQQ� Ol CL NO N (ui/4sn OOL) 6ulq:PON North America - ALASKA - BP PBU J J-17 PLAN J -17E J-1 7E WP11 Plus 500ft MD AOGCC Offset Well Report 01 November, 2019 lo Baker try117' Hughes BP Obp Anticollision Report Baker Hughes Company: North America - ALASKA - BP Project: PBU Reference Site: J Site Error: 0.0ousft Reference Well: J-17 Well Error: 0.00usft Reference Wellbore PLAN J -17E Reference Design: J-1 7E WP11 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well J-17 Mean Sea Level J -17D @ 69.80usft (Nordic 1) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference J-1 7E WP11 Pius 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Trav, Cylinder North Results Limited by: Maximum centre distance of 200 Error Surface: Pedal Curve Survey Tool Program Date 11/1/2019 From To (usft) 11 -ft) Survey (Wellbore) Tool Name 92.82 8,892.12 J-17 Srvy 2 GyroData (J-17) GYD-CT-CMS 8,931.00 10,174.20 J -17C Srvy 1 MWD+IFR+MS (J -17C) MWD+IFR+MS-WOCA 10,174.20 10,268.00 J-1 7E WP 11 Plus 500ft MD (PLAN J-1 7E) MWD+IFR+MS-WOCA 10,268.00 14,258.29 J -17E WP11 Plus 500ft MD (PLAN J -17E) MWD Description Gyrodata cont.casing m/s MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD - Standard 11/1/2019 12: 57 15P Page 2 of 3 COMPASS 5000.15 Build 90 IJ BP Anticollision Report Baker p Hughes Company: North America - ALASKA - BP Local Co-ordinate Reference: Well J-17 Project: PBU ND Reference: Mean Sea Level Reference Site: J MD Reference: J -17D @ 69.80usft (Nordic 1) Site Error: 0.00usft North Reference: True Reference Well: J-17 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore PLAN J -17E Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: J -17E WP11 Plus 500ft MD Offset ND Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) EX PR331213 F J J-01 - J-01 - J-01 4,218.71 4,075.00 65.52 J -01 -J -01A -J -DIA 4,205.80 4,075.00 64.87 J-01 - J-01 B- J-01 B 4,205.80 4,075.00 64.87 J-01 - J-01 B -Plan #7 4,220.91 4,100.00 65.89 J-01 - J-01 P81 - J-01 PB1 4,218.71 4,075.00 65.52 J-08 - J-08 - J-08 4,406.03 4,325.00 63.59 J-08 - J-08PB1 - J-08PB1 4,405.94 4,325.00 63.39 J-11 - J-11 - J-11 3,887.89 3,975.00 88.03 J -11 -J -11A -J -11A 3,886.39 3,975.00 88.13 J-11-J-11APB1-J-11APB1 3,886.39 3,975.00 88.13 J-15 - J-15 - J-15 2,389.19 2,425.00 58.43 J-15 - J-1 5A - J-1 5A 2,389.19 2,425.00 58.43 J-15 - J-1 5B - J -15B 2,389.19 2,425.00 58.43 J-16 - J-16 - J-16 3,308.07 3,350.00 106.16 J-16 - J -16A - J -16A 14,014.68 10,275.00 160.41 J-16 - J -16B - J -16B 3,308.07 3,350.00 106.16 J-16 - J-16BPB1 - J-16BPB1 3,308.07 3,350.00 106.16 J-17 - J-17 - J-17 11,277.74 10,875.00 26.03 J-17 - J -17A - J -17A 9,207.56 9,225.00 49.46 J-17 - J-1713 - J -17B 9,207.56 9,225.00 49.46 J-17 - J-17BPB1 - J-176PB1 9,207.56 9,225.00 49.46 J-17 - J -17C - J -17C 10,485.17 10,500.00 50.90 J-17 - J -17D - J -17D 10,485.17 10,500.00 50.90 J-18 - J-18 - J-18 417.01 425.00 114.07 J-18 - J -18A - J -18A 417.01 425.00 114.07 J-25 - J-25 - J-25 2,667.16 2,675.00 79.70 J-25 - J -25A - J -25A 2,667.16 2,675.00 79.70 J-25 - J -25A - Plan #6 2,667.20 2,675.00 79.70 J-26 - J-26 - J-26 1,742.78 1,750.00 36.43 J-27 - J-27 - J-27 2,967.08 2,975.00 24.99 J-27 - J -27A - J -27A 2,967.08 2,975.00 24.99 J-27 - J -27B - J -27B 2,967.08 2,975.00 24.99 J-28 - J-28 - J-28 3,045.24 3,050.00 20.24 J-28 - J -28A - J -28A 3,036.84 3,050.00 24.78 J-28 - J-28APB1 - J-28APB1 3,036.84 3,050.00 24.78 J-28 - J-28PB1 - J -28P81 3,045.24 3,050.00 20.24 J-29 - J-29 - J-29 1,640.78 1,650.00 147.28 Pians: Gwydyr Development (SHL) 0 11/1/2019 12:57:15PM Page 3 of 3 COMPASS 5000.15 Build 90 TREE = 4-1/16" CIWFLS WELLHEAD = WEVOY ACTUATOR= CIWSH3000 OKB ELEV = 76.98' REF ELEV = 69.80' BF. ELEV = 39.75 20" CONDUCTOR — KOP = 3000' Max Angle = 95-@1172T Datum MD = 10893 J-1 7 D SAFE RTES: WELL ANGLE > " 70 @ 11140' - 4-1/2" CHROME TBG ""'" INITIAL, "A", "B", & "C" WELLBORES NOT SHOWN*'* 110' 2218' 4-1/2" HES X NIP, ID = 3.813" 13-3/8" CSG, 72#, L-80, ID = 12.347" ft 2685' 9-5/8" X 7" BKR G2 ZXP LTP 1 8774' w / 11.6' TIEBK SLV, ID = 6.30" 9-5/8" X 7" BKR HMC LNR HGR, ID = 6.32" 8791' WHIPSTOCK (09/2705) 8952' 9-5/8" CSG, 47#, L-80, D = 8.681" _ 8931 Minimum ID = 2.00" @ 10050' 4-1/2" IBP STOP 2584' —19-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3235 3227 15 MMG DOME RK 16 02/03/19 3 6368 5608 45 MMG SO RK 20 02/03/19 2 8620 7308 37 MMC DMY RK 0 10/10/05 1 9936 8240 41 KBG2 DMY BK 0 10/10/05 MILLOUT WINDOW (J -17C) 8931'-8947' 10067' 1-1 7" X 5" BKR ZXP LTP w /11' TIEBACK, ID = 4.40" 10006' --j 4-1 /2" HES X ND, D = 3.813" 10027' 7" X 4-1/2" BKR S-3 PKR, D = 3.875" 10050' 4-1/2" HES X NIP, ID = 3.813" 10050' — 4-1/2" IBP STOP, ID = 2.00" (03/25/19) 10067' 1-1 7" X 5" BKR ZXP LTP w /11' TIEBACK, ID = 4.40" PERFORATION SUMMARY REF LOG: SLB W"L/ GR/ CCL ON 03/22/13 ANGLE AT TOP PERF: 93° @ 11990' Note: Refer to Production DB for historical pert data MILLOUT WINDOW (J -17D) 11735'- 11743' SIZE SPF INTERVAL Opn/Sqz DATE SQZ 2-7/8" X 2-3/8" XO PIN, ID = 1.992" 10070' 4-1/2" HES XN NIP, MILLED TO 3.80" (03/05/13) 11990 - 12020 4-1/2" TBG, 12.6#, 13C R-80 VAM TOP, 10083' WELL: J -17D 2" 6 12070 - 12100 O 06/16/14 .0152 bpf, D = 3.958" 2" 6 10083' O 11/02/13 12393' —2-1/8" BKR IBP(03/16/19) 2" 10084' 7" X 5" BKR LNR HGR, O 11/01/13 IIIER 12460' CMD WFD 2.28" EXT RANGE CIBP (08/31/17) 10091'5" X 4-1/2" XO, ID = 3.958" 7" LNR, 26#, L-80 BTC -M, .0383 bpf, ID = 6276" — 10234' 11/01/13 2" 6 12800 - 12830 10417' 4-1/2" MARKER JOINT, D = 4.00" 12670' CMD MILLED WFD 2.187" EXT RANGE CIBP (8/30/17) 2" 10971' 4-1/2" KB LTP, ID = 2.37" (04/03/13) 3-1/2" LNR, 9.3#, L-80 STL, _0087 bpf, ID = 2.992" 11382' 2" 6 13180- 13380 10979' 3.70 DEPLOYMENT SLV, D = 3.00" 4-1/2" LNR, 12.6#, L-80 IBT-M, -0152 bpf, ID = 3.958" — ^ 11735' 11001' —3-1/2" HES X NIP, ID = 2.813" 4-1/2" BKR WHIPSTOCK (03/13/13) — 11735' 11382' — 3-1 /2" X 3-3116" XO, D = 2.786" PERFORATION SUMMARY REF LOG: SLB W"L/ GR/ CCL ON 03/22/13 ANGLE AT TOP PERF: 93° @ 11990' Note: Refer to Production DB for historical pert data MILLOUT WINDOW (J -17D) 11735'- 11743' SIZE SPF INTERVAL Opn/Sqz DATE SQZ 2-7/8" X 2-3/8" XO PIN, ID = 1.992" 2" 6 11990 - 12020 O 06/16/14 WELL: J -17D 2" 6 12070 - 12100 O 06/16/14 SEC 9, T11 N, R1 3E, 801' FNL & 1806' FEL 2" 6 12190- 12220 O 11/02/13 12393' —2-1/8" BKR IBP(03/16/19) 2" 6 12220- 12250 O 11/01/13 IIIER 12460' CMD WFD 2.28" EXT RANGE CIBP (08/31/17) 2" 6 12640 - 12670 C 11/01/13 2" 6 12800 - 12830 C 10/31/13 12670' CMD MILLED WFD 2.187" EXT RANGE CIBP (8/30/17) 2" 6 12930- 12960 C 10/31/13 2" 6 13180- 13380 C 03/21/13 13082' — 3-3/16" X 2-7/8" XO, ID = 2.377" 3-1/4" LNR, 6.6#, L-80 TCII, .0079 bpf, ID = 2.850" 13082' 13445' —1 FISH: CDP MILLED (06/15/14) PBTD13439' 13480' 2-7/8" X 2-3/8" XO PIN, ID = 1.992" 2-7/8" LNR, 6.4#, L-80 STL, .0058 bpf, D = 2.441" 13485' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/18/83 AUDI 3 INITIAL COMPLETION 05/29/18 KP/JMD TREE C/O (05/26/18) WELL: J -17D 10/26/99 JLH CTD SIDETRACK (J -17A) 02/07/19 JPK/JMD GLV C/O (02/03/19) PERMIT No: 2130120 01/21/02 NORDIC 1 CTD SIDETRACK (J -17B) 03/19/19 JCF/JMD SET BKR IBP (03/16/19) API No: 50-029-20969-04 10/11/05 N2ES SIDETRACK (J -17C) 03/19/19 JMD CORRECTION TO XO ON WBS SEC 9, T11 N, R1 3E, 801' FNL & 1806' FEL 03/22113 NORDIC 1 CTD SIDETRACK (J -17D) 03/27/19 MH/JMD SET IBP STOP (03/25/19) 09/05/17 CF/JMD MILLED CIBP/SET CIBP/SE 04/10/19 DD/JMD+ ELEVATION CORRECTIONS (04/05/19) BP Exploration (Alaska) TREE = 4-1/16" CiW FLS V LLHEAD = McEVOY ACTUATOR= CIWSH3000 PROPOSED OKB ELEV = 76.98' REF ELEV = 69.80' --�' BF. ELEV = 39.75' 20- CONDUCTOR — 110' KOP = 3000' Max Angle = 95" @ 1172T DaUn MD = 10893' 13-3/8' CSG, 72#, L-80, D = 12.347' 1-i 2685 9-5/8" X 7" BKR G2 ZXP LTP I 8774' w / 11.6' T1EBK SI -V, D = 6.30" 9-518" X T BKR HMC LAR HGR D = 6.32" 879V WHIPSTOCK (09/2705) —8952- 19-5/8' CSG, 47#, L-80, D = 8.681" " 8931 Minimum ID = 2.00" @ 10060' 4-1/2" IBP STOP 4-1/2" TBG, 12.6#, 13CR-80 VAMTOP, 10083' .0152 bpf, D = 1958' 3 70" DEPLOYMENT SL V , D--3.00" 10120' 7" LNR 26#, L-80 BTC -M, .0383 bpf, D = 6.276" — 10234' 1 3-112" LNR 9.3#, L-80 Sit, .0087 bpf, ID = 2.992" 4-112" LNR 12.6#, L-80 BT -M .0152 bpf, D = 3.958" 10268' 4 1/2" BKR PACKER WFiPSTOC K 10268' 114' LNR, 6.6#, L-80 TCI..0079 bpf, D = 2.850` -j 10418' PBTD 1373V 7/8" LNR, 6.4#, I -130 STL, .0058 bpf, D = 2.441' 13768' _ SAFE OTES: WELL ANGLE> " 70 @ 11140' `"" 4-112" 1 7E CHROME TBG"" INITIAL, "A", "B & "C" WELLBORE'S NOT SHOWN — IL 221 a I4 112" FUS X NP, D= 3.813" 2584` t—j 9-518" DV PKR j GAS LIFT MANS ST MD TVD I DEV TYPE V LV LATCH PORT DATE 4 3235 3227 15 MMG DOME RK 16 02103/19 3 6368 5608 45 NM SO RK 20 02103/19 2 8620 7308 37 MNG DMY RK 0 10/10/05 1 9936 8240 41 KBG2 DMY BK 0 10/10/05 MLLOLTT WFDOW (J -17C) 893V -894r I 10006' � 4 112" HESX NP, ID= 3.813" SF'F I INTERVSi.. 10027• 7"X4 -1C2" BKR S-3 PFfft, D = 10060'--F4-1/2" FPS X NP, 1D=1813- 10067' -17" X 5" BKR ZXP LTP w /11' TIEBACK D = 4.40" 10070' 4-1/2" FES XN NP, MILLED TO 3.80" (03105113) 10083'WLEG, D = 3.958 - 10084' 7" X 5" BKR LNR HGR ID = 4A0" 10091' 5" X4-1/2" XO, D = 3.958" HES X NIP, D = 2.813" {j 10268' J--{ 3-1/2" X 3-3/16" XO, D = 2.786" I MLLOUT WINDOW (J -17E) ^10418 I--� 3-3/16` X 2-7/8' XO, iD = 2.377" PERFORATION SUMMARY RCF I OG ANGt.E AT TOP PURF` .__' Note. Refef to Pfoducbon W for Rislormal perfdata M- I SF'F I INTERVSi.. opolsw DATE sw. KPIJMD TREE C/O (05/26118) WELL: J -17D 10126199 JLH CTD SIDETRACK (J -17A) 02/07/19 JPK/JMD DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/18183 AUD13 INITIAL COMPLETION 05/29/18 KPIJMD TREE C/O (05/26118) WELL: J -17D 10126199 JLH CTD SIDETRACK (J -17A) 02/07/19 JPK/JMD GLV C/O (02/03119) PERMIT No: 2130120 01/21102 NORDIC 1 CTD SIDETRACK (J -17B) 03/19/19 JCF/JMD SET BKR BP (03/16119) API No: 50-029-20969-04 10111/05 N2ES SIDETRACK (J -17C) 03/19/19 JMD CORRECTION TO XO ON WBS SEC 9, T11 N, R13E, 801' FNL & 1806' FEL 03/22/13 NORDIC 1 CTD SIDETRACK (J47D) 03127119 MH1JMD SET BP STOP (03/25/19) 09105/17 CF/JMD MLLED CBP/SET CBP/SE' 04/10/19 DD/JMD+ ELEVATION CORRECTIONS (04105119) BP Exploration (Alaska) Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 Quick Test Sub to Otis Top of7"Otis O.Oft .—.----- .—.—.—.—.——.—._.—.—. t CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub •� 7-1/16" 5k Flange x 7" Otis Box Top of Annular 6.0 ft Hydril 7 1116" Top of Annular Element 6.7ft Annular Bottom Annular 8.0 ft60113111111 Cr Blind/Shears 9.3 ft MOM& Cr 2-3/8" Pipe/Slips 10.1 ft 2-3/8" Pipe/Slips B1 62 83 Ba Choke Line Kill Line' °e CL 2-3/8" x 3-1/2" VBRs 12.6 ft 0 CL 2-3/8" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft' Swab TT1i CL of Flow Cross 17.4 ft } Master CL of Master 18.8 ft LDS IA OA LDS Ground Level T2 Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: � -- % 7 PTD: V/ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, �composite curves for well logs run must be submitted to the AOGCC ithin 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 - _Well Name: PRUDHOE BAY UNIT J -17E Program DEV Well bore seg ❑ PTD#:2191560 Company BP Exploration (Alaska Inc. - Initial Class/Type DEV/PEND GeoArea 890_______._ __ Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA Appr Date SFD 11/8/2019 Engineering 2 Lease number appropriate_ - Yes Entire Well lies within ADL0028281. 3 Unique well name and number - - - - - - - - - - Yes PRUDHOE BAY, PRUDHOE -OIL POOL - 64015, governed by CO 341 H . - 4 Well located in a_defined_pool_ - - - - Yes CO 341_H, Rule 2_ Th_ere_s_hall be_ no_restriction_s as to well spacing except that no pay_shall be 5 Well located proper distance from drilling unit -boundary - - _ - _Yes opened_ in a well closer than 500 feet to_the boundary_ of the -affected _area. As planned, well 6 Well located proper distance_ from other wells_ - - - - Yes - - - conforms to spacing requirements, - - - - - - - - - 7 Sufficient acreage available in -drilling unit_ - - - - - Yes - - - - - - - - 8 If deviated, is. wellbore plat -included -- Yes - - 9 Operator only affected party - - - - - - Yes - - . - 10 Operator has -appropriate_ bond in force - - - - - Yes. All wellbores_ pass BP separation criteria _ - - - - - - - - - - 11 Permit can be issued without conservation order- _ . _ _ - _ - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - 12 Permit can be issued without administrative -approval _ - - - - - - - - Yes _ - - - - - - - - - - - . .. . - 13 Can permit be approved before 15 -day wait- - - -Yes Yes - - - - - -- - 14 Well located within area and -strata authorized by Injection Order # (put_ 10# in comments)_ (For_ _N_A_ - - 5000 psi stack - - - - - - 15 All wells -within 1/4. mile -area -of review identified (For service well only) _ _ _ _ _ _ _ _ _ - . _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 16 Pre -produced injector: duration of pre production less_ than 3 months_ (For service well only) - NA_-- ------ -- - - - - - - - - - - - - - - - . - _ - _ _ _ _ _ 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) - - _ .. - NA_ _ .. - - _ - - - Appr Date MGR 11/21/2019 Geology Appr Date SFD 11/8/2019 18 -Conductor string -provided - - - - - - . _ _ - - _ _ _NA_ - - - - CTD sidetrack, all drilling will be performed, in the reservoir from existing wellbore. 19 Surface casing_ protects all known_ USDWs - - - - - - - - - - - - - - NA. CTD sidetrack, all drilling will be performed_ in the reservoir from existing wellbore. 20 CMT_v_ol_ adequate_to circulate. on -c to surf _csg - - - NA_ CTD sidetrack_, all drilling will be performed_ in the reservoir from existing wellbore.- - - - - - - - 21 CMT vol adequate to tie -in -long string to -surf csg_ - - - - - - _ _ - - -NA_ CTD sidetrack_, all drilling will be performed_ in the reservoir from existing wellbore._ 22 CMT_will coverall known -productive horizons_ - Yes Fully cemented production liner. - - - - - - - - - - - - - - 23 Casing designs adequate for C, -T, B &_ permafr_ost_ - Yes _ - _ - _ - - - - - 24 Adequate tankage or reserve pit - - - Yes CDR2 has adequate tankage and good truck. support, All cutting -to Grind_ and Inject - - - 25 If_a_re-drill, has -a. 10-403 for abandonment been approved - - - - - - - - - - - .... Yes - - - - Sundry -505 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 26 Adequate wellbore separation _proposed - - - - Yes All wellbores_ pass BP separation criteria _ - - - - - - - - - - 27 If_diverter required, does it meet_ regulations- - _ - - - - _ NA_ - - CTD sidetrack, all drilling will be performed- in the reservoir from existing wellbore._ - - - 28 -Drilling fluid -program schematic _& equip-list_adequat_e_ - - - - - - - - Yes All fluids will -be overbalanced_ to pore pressure - - - - - - - - 29 BOPEs,_do they meet regulation - - - Yes 4 ram stack,_1_ annular -and a CTD_packoff 30 BOPE_press rating appropriate; test to -(put psig in comments)_ - Yes - 5000 psi stack - - - - - - 31 Choke_ manifold complies w/API_RP-53(May 84)---- _ - -- - -- - - -- - Yes_ _____________________________--- -._-_._ - - ---------- 32 Work will occur with operation shutdown_ Yes CDR2 is ongoing operations - - - - - - - - - - - - - - - - - - - 33 Is presence_ of H2S gas. probable - - - - - - - No J pad -is less_ than 100 ppm - - - - - - - - - - _ _ _ _ _ _ _ - _ 34 Mechanical -condition of wells within AOR verified (_For_ service well only) NA_ - - - - - _ - - . - - - - - - 35 Permit can be issued w/o hydrogen. sulfide measures - - - - - - - - - - - No_ H2S measures are required Well measured 20 ppm on 4/_26/19. _ - - - - - - - - - - - - - - - - - - - - 36 -Data presented on potential overpressure zones - - - - - - - - - - Yes - - - - Expected reservoir pressure is 7.05 ppg EMW; will be drilled using -8.4 ppg mud and coiled tubing. 37 Seismic_analysis, of shallow gas -zones_ - - _ _ _ _N_A_ Shouldhigher-pore-pressures be_encou_ntered, BP has -immediate access to nearby fl_uid_mixing facilities. 38 Seabed condition survey -(if off -shore) _ - - - - - - - - - - - - - - - - NA_ Two faults will.be crossed; Operator -considers_ lost circulation -risk to be low. - - - - - - - - 39 Contact name/phone for Weekly -progress reports_ [exploratory only] NA_ - - _ - - - - - - - - - - - _ - - _ _ _ _ _ _ _ _ _ _ _ - - _ _ - - _ - - _ _ - - Geologic Engineering Public Commissioner: Date: Commissioner: Date on Date �� ��11211161