HomeMy WebLinkAbout221-0847. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in thes pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
Subsequent Form Required:
Approved By: Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU E-26B
Mill CIBP, Ext Perf w
CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage,
AK 99503
221-084
50-029-21781-02-00
ADL 0028299, 0028304
12198
Surface
Intermediate
Liner
Liner
Liner
9137
2651
7951
1365
240
3179
11775
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9141
38 - 2689
36 - 7987
7833 - 9198
9045 - 9285
9018 - 12197
2585
38 - 2689
36 - 7786
7657 - 8733
8654 - 8758
8637 - 9137
11805, Unknown,
12107
2260
4760
5410
7500
10530
11775
5020
6870
7240
8430
10160
11405 - 12180 4-1/2" 12.6# L-80 34 - 90449146 - 9141
Conductor 78 20" 39 - 117 39 - 117
4-1/2" Baker S3 Packer
No SSSV Installed
8987, 8616
Date:
Torin Roschinger
Operations Manager
Ben Walters
benjamin.walters@hilcorp.com
907.564.4899
PRUDHOE BAY
12/8/2025
Current Pools:
Prudhoe Oil
Proposed Pools:
Prudhoe Oil
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2025.11.24 11:14:42 -
09'00'
Torin Roschinger
(4662)
325-724
By Grace Christianson at 1:06 pm, Nov 24, 2025
DSR-11/24/25
10-404
Perforating gun BHA not to exceed 500'.
Reestablish pressure containment prior to perforating.
Perform and document well control drill on each shift using attached standing orders.
Ensure well is dead before breaking containment
J.Lau 11/24/25 TS 11/25/25
11/25/25
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Well Name:E-26B API Number: 50-029-21781-02
Current Status:Operable Producer Rig:CTU
Estimated Start Date:12/8/2025 Estimated Duration:4 days
Reg.Approval Reqstd?10-403, 10-404 Date Reg. Approval Recvd:Check status
Regulatory Contact:Abbie Barker
First Call Engineer:Ben Walters (907) 564-4899 (O) (907) 214-2028 (M)
Second Call Engineer:Leif Knatterud (907) 564-4667 (O) (432) 227-4342 (M)
Current Bottom Hole Pressure:3250 psi @ 8,800 TVD 7.2 PPGE | (Estimated)
Maximum Expected BHP:3500 psi @ 8,800 TVD 7.5 PPGE | (Highest Ivishak BHP)
Max. Anticipated Surface Pressure:2585psi (Based on 0.1 psi/ft. gas gradient)
Last SI WHP:1500psi (9/18/25)
H2S Level (Most Recent / Highest)11 ppm 06/19/2025, 15 ppm 01/18/2023
Min ID:2.313 @ 9,018 MD @ X-NIP
Max Angle:110 Deg @ 13,152
Brief Well Summary:
E-26B is a CTD sidetrack drilled in April 2022. The well is currently online, producing from under the TAR
in Zone 2A within the EK Graben. Current production rates are approximately 688 BFPD and 9,359
MMSCFD, indicating a recent increase in GOR.
The well has a history of declining production, which is believed to be caused by near-bore asphaltene
deposition restricting flow. Similar issues have been observed in other wells produced under the TAR.
Previous xylene washes in neighboring wells have shown limited improvement.
Looking back at production prior to the current production interval, we propose milling and opening up
the toe perforations to regain access to the higher productivity zones. Additionally, we recommend
performing an add/re-perf job, similar to the work completed in September 2024.
Objective:Mill CIBP and fish below push down to ~12,100 ft MD to open up lower perforations, Run tie-
in log, set new CIBP @12,000 ft MD, Add/Re-Perf 283 interval in Z2A.
Procedure:
Coil Tubing Mill Plugs, run tie-in log, and set CIBP
1. MU motor/venturi burn shoe, mill 2-7/8 CIBPs (11,775, 11,805 CTMD & CIBP below) and
recover.
Coil was last on this well in Aug 2025 for perf wash for asphaltenes, maybe potential
presence within the liner. Coil tagged CIBP @ 11,747 CTMD.
Due to min ID @ X-NIP @ 9,018 consider a 2.25 burn shoe to reduce risk of sticking a
possibly flared burn shoe
Decrease speed to 5 fpm across the X-NIP when pulling out with the burn shoe.
Record burn shoe OD in AWGRS after milling operation.
2. Based on the results of the first plug and WSS discretion, a second venturi burn shoe or mill can
be used on the last two CIBP and recover/push down to min. acceptable depth of 12,030 (target
depth of ~12,100)
Contact OE if unable to make down to min. acceptable depth.
3. MU GR/CCL with 2.25 JSN drift. RIH to ~12,100. Flag pipe and pull tie-in log.
Flag pipe for plug set depth (12,000) and perforating depth (11,390 to 11,490 and
11,622 to 11,805) (415 ft total / 283 net perf add)
4. POOH. Correlate with Baker Hughes mRPM GR/CCL 4/09/2023. Correct flag and send to Jeff
Nelson and OE.
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
5. MU extended range CIBP and set at 12,000 ft MD.
Prefer extended range over standard due to being in lower end of set range. If
unavailable standard is acceptable.
6. POOH.
Coil Extended Perforating
Notes:
Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations
Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and
WSS coverage is required.
The well will be killed and monitored before making up the initial perf guns. This is generally done during
the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or
circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either
be killed by bullheading while POOH or circulating bottoms up through the same port that opened to
shear the firing head.
1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull
through the brass upon POOH with guns.
2. Bullhead 1.2x wellbore volume ~185bbls1% KCL/SW down tubing. Max tubing pressure 2500
psi. (This step can be performed any time prior to open-hole deployment of the perf guns.
Timing of the well kill is at the discretion of the WSS.)
a. Wellbore volume to top perf = 154 bbls
b. 4-1/2 Tubing 8,984 X .0152 bpf = 137 bbls
c. 3-1/2 Liner 748 X 0.0087 bpf = 7 bbls
d. 2-7/8 Liner 1,676 X 0.0058 bpf = 10 bbls
3. At surface, prepare for deployment of TCP guns.
4. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl
or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is
re-established. Fluids man-watch must be performed while deploying perf guns to ensure the
well remains killed and there is no excess flow.
5.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review
well control steps with crew prior to breaking lubricator connection and commencing makeup of
TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety
joint/TIW valve readily accessible near the working platform for quick deployment if necessary.
e.At the beginning of each job, the crossover/safety joint must be physically MU to the
perf guns one time to confirm the threads are compatible.
6.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below.
Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch
must be performed while deploying perf guns to ensure the well remains killed and there is no
excess flow.
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Perf Schedule
Use 2 Maxforce6 SPF
Perf Interval (tie-in depths) Lengths
Total Gun
Length Weight of Gun (lbs)
11,390 11,490 gun
11,490 11,622 blank
11,622 11,805 gun
100 - loaded
132 - blank
183 - loaded
415~2316 lbs (5.58 ppf)
7. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule
above.
a. Note any tubing pressure change in WSR.
8. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if
necessary.
9. Review well control steps and Standing Orders with crew prior to breaking lubricator connection
and commencing breakdown of TCP gun string.
10. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun
BHA.
11. RDMO CTU.
12. Turn well over to Operations POP.
Attachments:
Wellbore Schematic
Proposed Schematic
Tie-In Log
BOPE Schematic
Standing Orders
Rig-up diagram
Sundry Change Form
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Current Wellbore Schematic
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Proposed Wellbore Schematic
Proposed Perforations:
11,390 11,490 (100)
11,622 11,805 (183)
Total footage (283)
CIBP set at ~12,000
O
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Tie-in Log
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Perf: 11,390 11,490
Perf: 11,622 11,805
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
BOP Schematic
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Mill CIBP and Ext Add Perfs
E-26B
PTD: 221-084
Changes to Approved Sundry Procedure
Date:
Subject:
Sundry #:
Any modifications to an approved sundry will be documented and approved below. Changes to
an approved sundry will be communicated to the AOGCC by the first call engineer. AOGCC
written approval of the change is required before implementing the change.
Step Page Date Procedure Change
HNS Prepared
By (Initials)
HNS Approved
By (Initials)
AOGCC Written
Approval
Received
(Person and
Date)
Approval:
Operations Manager Date
Prepared:
Operations Engineer Date
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-26B
Mill CIBP, Extended Perf w CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
221-084
50-029-21781-02-00
12198
Surface
Intermediate
Liner
Liner
Liner
9137
2651
7951
1365
240
3179
11775
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9141
38 - 2689
36 - 7987
7833 - 9198
9045 - 9285
9018 - 12197
38 - 2689
36 - 7786
7657 - 8733
8654 - 8758
8637 - 9137
11805, 12107
2260
4760
5410
7500
10530
11775, 11800
5020
6870
7240
8430
10160
11405 - 12180
4-1/2" 12.6# L-80 34 - 9044
9146 - 9141
Conductor 78 20" 39 - 117 39 - 117
4-1/2" Baker S3 Hydro Set Packer
8987
8616
Torin Roschinger
Operations Manager
Finn Oestgaard
finn.oestgaard@hilcorp.com
907.564.5026
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
34 - 8654
N/A
N/A
106
933
5996
25381
568
1020
250
1350
250
860
324-497
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
8987, 8616
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 3:55 pm, Sep 30, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.09.30 14:35:55 -
08'00'
Torin
Roschinger
(4662)
RBDMS JSB 100324
WCB 12-2-2024 DSR-10/2/24
ACTIVITY DATE SUMMARY
9/23/2024
LRS CTU 1, 1.5" Blue coil. Job Objective: Extended Adperf
MIRU. Function test BOPs upon installation. Bump up CTC against brass. H2S and
LEL monitors set. Make up and RIH with 2.25" DJN, and HES 2.200" HES GR/CCL
carrier. Tag restriction at 11600, make multiple attempt to jet through. log from tag up
to 8850. POOH. +24' correction. M/U baker 1.69" milling assembly w/2.3" 4 blade
junk mill. RIH
***Cont to WSR on 9/24/24***
9/24/2024
LRS CTU 1, 1.5" Blue coil. Job Objective: Extended Adperf
Cont RIH with Baker milling BHA w/2.3" 4 blade junk mill. Correct depth at flag and
mill/push CIBP debris down to 11805. Flag pipe for perf guns - Orange. EOP at flag
= 11382.65. Ream perforation interval, and then drift liner with 2.300" mill. Clean
drift. POOH for perf guns. Confirm fit up of perf guns to safety joint XO. Bullhead
well with 230 bbl of 1% KCL w/ safelube. Hold well control drill with crew prior to
deployment. RIH, correct depth at flag and perforate intervals 11,405'-11,475',
11,622'-11,760' w/2" Geo RZR guns, 6spf, 60 degree phase. POOH. Load well
w/230bbls SW on the way out of hole
***Cont to WSR on 9/25/24***
9/25/2024
LRS CTU 1, 1.5" Blue coil. Job Objective: Extended Adperf
Perform PJSM with crew for un-deployment. Held well control drill. well on full losses
L/D 355' HES 2" Geo RZR guns. M/U HES GR/CCL RIH. Tag high at 11693, appears
that plug had slid up hole again. Work plug down to 11,805CTMD and pick up heavy,
detained for apx 1.5 hours. Pop free, jet out of liner and dry drift back down to tag.
Log up to 10,000'. POOH. +42' correction. M/U BOT CIBP RIH. Correct at flag and
set CIBP at 11,775'. POOH. Pump 5 bbl 60/40 cap on well. Rig down CTU.
***Job Complete***
Daily Report of Well Operations
PBU E-26B
Adperfs, CIBP, and CIBP fish are correctly shown on WBS below. -WCB
perforate intervals 11,405'-11,475',
gg
Work plug down to 11,805CTMD
y
11,622'-11,760'
g
set CIBP at 11,775'.
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in this pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU E-26B
Extended Perf w CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
221-084
50-029-21781-02-00
341J
ADL 0028299, 0028304
12198
Surface
Intermediate
Liner
Liner
Liner
9137
2651
7951
1365
240
3179
11770
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9140
38 - 2689
36 - 7987
7833 - 9198
9045 - 9285
9018 - 12197
2425
38 - 2689
36 - 7786
7657 - 8733
8654 - 8758
8637 - 9137
12107
2260
4760
5410
7500
10530
11770, 11800
5020
6870
7240
8430
10160
11405 - 12180 4-1/2" 12.6# L-80 34 - 90449146 - 9141
Conductor 78 20" 39 - 117 39 - 117
4-1/2" Baker S3 Hydro Set Packer
No SSSV Installed
8987, 8616
Date:
Torin Roschinger
Operations Manager
Finn Oestgaard
finn.oestgaard@hilcorp.com
907.564.5026
PRUDHOE BAY
9/13/2024
Current Pools:
PRUDHOE OIL
Proposed Pools:
PRUDHOE OIL
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.08.30 11:02:30 -
08'00'
Torin
Roschinger
(4662)
By Grace Christianson at 12:04 pm, Aug 30, 2024
324-497
10-404
A.Dewhurst 04SEP24
MGR09AUG24 DSR-9/5/24*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2024.09.10 17:58:40 -05'00'09/10/24
RBDMS JSB 091124
CT Extended Adperf
Well: E-26B
Well Name:E-26B API Number:50-029-21781-02
Current Status:Operable producer online Pad:E-Pad
Estimated Start Date:09/13/2024 Rig:CT
Reg. Approval Req’d?10-403/10-404 Date Reg. Approval Rec’vd:
Regulatory Contact:Abbie Barker Permit to Drill Number:211-084
First Call Engineer Finn Oestgaard Contact:907-350-8420 (C)
Second Call Engineer:Michael Hibbert Contact:907-903-5990 (C)
Current Bottom Hole Pressure:3250 psi Estimated based on Average Ivishak BHP
KWF:7.2 ppg Use seawater or 1% KCL
MPSP:2425 psi (BHP - .1psi/ft gas gradient + safety factor)
Max Dev:110 deg At 11,268’ MD
Min ID:2.313” 9,018’ MD @ XN nipple
Tie In Log Baker Hughes MPRGR 3/30/2022
Last SIWHP Estimated 2380 psi
Brief Well Summary:
E-26B is CTD sidetrack drilled in April 2022. The well is currently online and producing from under the TAR from
Zone 2A in the EK Graben. The initial stage of perfs had minimal vertical offset to the OWC and came in @ a
higher water cut than desired. A plug was set and the current perforations were shot and the well has been a
fulltime producer since.
Production rate has been on the decline and it is believed to be due to near wellbore asphaltene deposition
choking off production. Similar issues have been observed in other under the TAR wells, xylene washes have
been attempted on neighboring wells with questionable improvements. This intervention will reperforate the
current perforations penetrating beyond the near wellbore asphaltene deposition and add new footage
increasing the total footage open to flow from 140’ to 208’. The well does has future up hole perf potential
with a sizeable oil column that was logged last year.
Objective:
Perforate 208’ of net charges over a 355’ interval in Z2A.
Procedure:
Coiled Tubing Drift and Flag
1. MU drift BHA (configuration per WSLdiscretion), RIH & tag CIBP @ 11,770’ and flag pipe for perf
depths.
a. Coil was last in the well in April 2023 tagged CIBP @ 11,770’ prior to running RPM log.
b. Productivity of the well has deteriorated significantly since previous coil intervention last year.
Near wellbore asphaltenes are suspected culprit, there may be potential for presence within
the liner. Note if any excess stickiness etc. while in the liner for the drift or if tools come out of
hole with some attached.
Coil – Extended Perforating
Notes:
x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations
x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS
coverage is required.
The well will be killed and monitored before making up the initial perf guns. This is generally done during the
drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating
bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by
bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head.
CT Extended Adperf
Well: E-26B
1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through
the brass upon POOH with guns.
2. Bullhead 1.2x wellbore volume ~185 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi.
(This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the
well kill is at the discretion of the WSS.)
a. Wellbore volume to top perf = 154 bbls
b. 4-1/2” Tubing – 8,984’ X .0152 bpf = 137 bbls
c. 3-1/2” Liner – 745’ X 0.0087 bpf = 7 bbls
d. 2-7/8” Liner – 1,676’ X 0.0058 bpf = 10 bbls
3. At surface, prepare for deployment of TCP guns.
4. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5
ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established.
Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed
and there is no excess flow.
5.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well
control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun
string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve
readily accessible near the working platform for quick deployment if necessary.
e.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns
one time to confirm the threads are compatible.
6.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly
monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed
while deploying perf guns to ensure the well remains killed and there is no excess flow.
Perf Schedule
Use 2” Maxforce6 SPF
Perf Interval (tie-in depths) Lengths
Total Gun
Length Weight of Gun (lbs)
11,405’ – 11,475’ – gun
11,475’ – 11,622’ – blank
11,622’ – 11,760’ – gun
70’ - loaded
147’ - blank
138’ - loaded
355’~1981 lbs (5.58 ppf)
7. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule
above.
a. Note any tubing pressure change in WSR.
8. After perforating, PUH 50’ to get the guns moving then RIH and lightly tag CIBP @ 11,770’ & stack 5k to
confirm still set after firing guns in close proximity. (Plug @ 11,800’ on WBS was dislodged during
previous perforating operations). Confirm well is dead and re-kill, if necessary, before pulling to surface.
9. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary.
10. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and
commencing breakdown of TCP gun string.
11. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA.
12. RDMO CTU.
13. Turn well over to Operations POP.
Make up PCE. - mgr
CT Extended Adperf
Well: E-26B
Attachments:
x Wellbore Schematic
x Proposed Schematic
x BOPE Schematic
x Standing Orders
x Equipment layout diagram
x Sundry Change Form
CT Extended Adperf
Well: E-26B
Current Schematic
221-084
CT Extended Adperf
Well: E-26B
Proposed Wellbore Schematic
Proposed Perforations
11,405’ – 11,475’ (70’)
11,622’ – 11,760’ (138’)
Total footage: (208’)
221-084
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-26B
Install LTP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
221-084
50-029-21781-02-00
12198
Surface
Intermediate
Liner
Liner
Liner
9137
2651
7951
1365
240
3179
11770
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9140
38 - 2689
36 - 7987
7833 - 9198
9045 - 9285
9018 - 12197
38 - 2689
36 - 7786
7657 - 8733
8654 - 8758
8637 - 9137
12107
2260
4760
5410
7500
10530
11770, 11800
5020
6870
7240
8430
10160
11405 - 12180
4-1/2" 12.6# L-80 34 - 9044
9146 - 9141
Conductor 78 20" 39 - 117 39 - 117
4-1/2" Baker S-3 Hydro Set Packer 8987, 8616
8987
8616
Torin Roschinger
Area Operations Manager
Kirsty Glasheen
Kirsty.Glasheen@hilcorp.com
907.564.5258
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
34 - 8654
N/A
N/A
191
505
19650
14575
1254
1373
550
1200
1000
767
N/A
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 3:57 pm, Jun 13, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.06.13 15:49:22 -08'00'
Torin
Roschinger
(4662)
DSR-6/13/23
RBDMS JSB 071423
WCB 1-9-2024
ACTIVITY DATE SUMMARY
6/5/2023
***WELL S/I ON ARRIVAL***
DRIFTED TO LTP @ 9004'MD w/20'x3.70'' DMY WHIPSTOCK DRIFT
SET NS MONO-PAK 450 LTP (18.32' OAL)(QCLL stung into LTP @ 8998' MD, Top
of NS MONO 8984' MD)
PERFORMED PASSING MIT-T 2420PSI(Pass)
PULLED 2-7/8'' XX-PLUG FROM X-NIP IN LTP(ptsa) 9017' MD
***WELL LEFT S/I ON DEPARTURE***
Daily Report of Well Operations
PBU E-26B
The new LTP is correctly shown on the new WBS, below. -WCB
@
SET NS MONO-PAK 450 LTP (18.32' OAL)(QCLL stung into LTP @ 8998' MD, Top
of NS MONO 8984' MD) )
PERFORMED PASSING MIT-T 2420PSI(Pass)()
PULLED 2-7/8'' XX-PLUG FROM X-NIP IN LTP(ptsa) 9017' MD
CT Extended Adperf
Well: E-26B
BOP Schematic
CT Extended Adperf
Well: E-26B
CT Extended Adperf
Well: E-26B
CT Extended Adperf
Well: E-26B
Changes to Approved Sundry Procedure
Date:
Subject:
Sundry #:
Any modifications to an approved sundry will be documented and approved below. Changes to an
approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written
approval of the change is required before implementing the change.
Step Page Date Procedure Change
HNS
Prepared
By
(Initials)
HNS
Approved
By
(Initials)
AOGCC
Written
Approval
Received
(Person and
Date)
Approval:
Operations Manager Date
Prepared:
Operations Engineer Date
Nolan Vlahovich Hilcorp Alaska, LLC
Geo Tech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: Kyle.Wiseman@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 06/02/2023
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20230415
Well API #PTD #Log Date Log Company Log Type AOGCC
Eset#
END 2-20 50029220480000 190060 4/12/2023 BAKER SPN
PBU 01-10 50029201690000 175043 4/15/2023 BAKER SPN
PBU 01-13 50029202700000 177059 4/13/2023 BAKER SPN
PBU 15-05B 50029207310200 211057 4/24/2023 BAKER RPM
PBU 15-09B 50029212010200 212024 4/26/2023 BAKER RPM
PBU D-01A 50029200540100 197078
4/15/2023 BAKER SPN
PBU D-10 50029203890000 179053 4/17/2023 BAKER SPN
PBU E-26B 50029217810200 221084 4/9/2023 BAKER MRPM
PBU F-33A 50029226400100 208163 4/20/2023 BAKER SPN
PBU J-12 50029204450000 180017 4/17/2022 BAKER SPN
PBU J-19 50029216290000 186135 4/18/2023 BAKER SPN
PBU N-15 50029206070000 181079 4/20/2023 BAKER SPN
PBU R-04 50029203740000 179038 4/21/2023 BAKER SPN
PBU R-27 50029215570000 186051 4/22/2023 BAKER SPN
PBU Z-25 50029219020000 188159 4/23/2023 BAKER SPN
Please include current contact information if different from above.
T37696
T37697
T37698
T37699
T37700
T37701
T37702
T37703
T37704
T37705
T37706
T37707
T37708
T37709
T37710
PBU E-26B 50029217810200 221084 4/9/2023 BAKER MRPM
Kayla Junke
Digitally signed by Kayla
Junke
Date: 2023.06.05 11:18:47
-08'00'
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21781-02-00Well Name/No. PRUDHOE BAY UNIT E-26BCompletion Status1-OILCompletion Date4/5/2022Permit to Drill2210840Operator Hilcorp North Slope, LLCMD12198TVD9137Current Status1-OIL8/31/2022UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:MWD/GR/RESNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleDF4/29/20229187 12197 Electronic Data Set, Filename: PBU E-26B GAMMA RES.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 01.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 02.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 03.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 04.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 05.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 06.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 07.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 08.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 09.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 10.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 11.las36515EDDigital DataDF4/29/2022################Electronic Data Set, Filename: PBU E-26B PWD Run 12.las36515EDDigital DataWednesday, August 31, 2022AOGCCPage 1 of 4PBU E-26BGAMMA RES.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21781-02-00Well Name/No. PRUDHOE BAY UNIT E-26BCompletion Status1-OILCompletion Date4/5/2022Permit to Drill2210840Operator Hilcorp North Slope, LLCMD12198TVD9137Current Status1-OIL8/31/2022UICNoDF4/29/2022 Electronic File: PBU E-26B 2MD Final Log.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 2TVDSS Final Log.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5MD Final Log.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5TVDSS Final Log.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 01.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 02.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 03.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 04.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 05.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 06.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 07.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 08.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 09.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 10.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 11.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 12.cgm36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 2MD Final Log.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 2TVDSS Final Log.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5MD Final Log.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5TVDSS Final Log.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 01.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 02.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 03.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 04.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 05.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 06.PDF36515EDDigital DataWednesday, August 31, 2022AOGCCPage 2 of 4
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21781-02-00Well Name/No. PRUDHOE BAY UNIT E-26BCompletion Status1-OILCompletion Date4/5/2022Permit to Drill2210840Operator Hilcorp North Slope, LLCMD12198TVD9137Current Status1-OIL8/31/2022UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDDF4/29/2022 Electronic File: PBU E-26B PWD Run 07.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 08.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 09.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 10.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 11.PDF36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 12.PDF36515EDDigital DataDF4/29/2022 Electronic File: E-26B Definitive Surveys.pdf36515EDDigital DataDF4/29/2022 Electronic File: E-26B Definitive Surveys.xlsx36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 2MD Final Log.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5MD Final Log.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B 5TVDSS Final Log.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 01.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 02.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 03.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 04.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 05.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 06.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 07.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 08.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 09.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 10.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 11.tif36515EDDigital DataDF4/29/2022 Electronic File: PBU E-26B PWD Run 12.tif36515EDDigital DataWednesday, August 31, 2022AOGCCPage 3 of 4
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21781-02-00Well Name/No. PRUDHOE BAY UNIT E-26BCompletion Status1-OILCompletion Date4/5/2022Permit to Drill2210840Operator Hilcorp North Slope, LLCMD12198TVD9137Current Status1-OIL8/31/2022UICNoCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date: 4/5/2022Release Date:10/15/2021Wednesday, August 31, 2022AOGCCPage 4 of 4M. Guhl8/31/2022
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-26B
Replace LTP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
221-084
50-029-21781-02-00
12198
Surface
Intermediate
Liner
Liner
Liner
9137
2651
7951
1365
240
3179
9018
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
8637
38 - 2689
36 - 7987
7833 - 9198
9045 - 9285
9018 - 12197
38 - 2689
36 - 7786
7657 - 8733
8654 - 8758
8637 - 9137
12107
2260
4760
5410
7500
10530
9018, 11770, 11800
5020
6870
7240
8430
10160
11405 - 12180
4-1/2" 12.6# L-80 34 - 9044
9146 - 9141
Conductor 78 20" 39 - 117 39 - 117
4-1/2" Baker S-3 Hydro Set Packer 8616
8987
8616
Torin Roschinger
Area Operations Manager
Kirsty Glasheen
Kirsty.Glasheen@hilcorp.com
907.564.5258
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
34 - 8654
N/A
N/A
191
Well Not Online
19650 1254 550
500
1000
500
N/A
13b. Pools active after work:Prudhoe Oil
No SSSV Installed 8987
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Kayla Junke at 1:52 pm, May 02, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.05.02 13:35:53 -08'00'
Torin Roschinger
(4662)
RBDMS JSB 050323
DSR-5/2/23WCB 1/4/24
ACTIVITY DATE SUMMARY
4/6/2023
***WELL FLOWING ON ARRIVAL***
BRUSHED w/ 2-7/8'' BLB, 1-3/4'' S- BAILER, BRUSH THROUGH LTP, BRUSH SLD
SLV @ ~8989'SLM & 2-7/8'' X-NIP @ ~8997'SLM
RAN 2-7/8'' 42 BO (shift up, selective keys) RS, MADE MULTIPLE CLEAN PASSES
UP THROUGH SLD SLV @ 8989'SLM, POOH.
SET 2.31'' XX-PLUG (on seat, 6- 3/16'' eq ports, 46'' lih, 24'' fill ext) IN PTSA @
8,994' SLM
TURN OVER TO OPERATIONS TO BRING WELL ONLINE, WELL MADE 8.5 TO
8.7 GAS, S/I WELL, SET ANOTHER PLUG
SET 2.31'' XX-PLUG (control,2- 3/16'' eq ports, 23'' lih) IN LTP ASSY SSD @ 8,984'
SLM
***WSR CONT ON 4-7-23***
4/7/2023
***WSR CONT FROM 4-6-23***
TURN OVER TO OPERATIONS TO BRING WELL ONLINE, WELL IS MAKING 8.5
TO 8.7 GAS
EQ & PULLED 2.313" XX-PLUG FROM 8,984' SLM / 9,007' MD (LTP SSD)
EQ & PULLED 2.313" XX-PLUG FROM 8,994' SLM / 9,017' MD (LTP PTSA)
PULLED KB LTP FROM @ 8972' SLM / 9,004' SLM(elements in good condition, SSD
closed, QCLL seals torn but intact)
PULLED PTSA & QCLL RECEPTICAL FROM DEPLY SLEEVE @ 8985'SLM/ 9,008'
MD
BRUSH w/ 4-1/2" BLB & 3.80" G-RING BETWEEN X-NIP @ 8,977' MD & DEPLOY
SLV @ 9,018' MD
BRUSHED DEPLOY SLV @ 9,018 MD
***WSR CONT ON 4-8-23***
4/8/2023
***WSR CONT FROM 4-7-23***
RAN 45 KB PACKER + PTSA DRIFT TO DEPLOYMENT SLEEVE @ 9018'MD
(tatteltale pins sheared & ring on no-go)
SET NS 45 MONO-PAK LTP ( lih 12.55') IN DEPLOYMENT SLEEVE @ 9018' MD
(DEP SLV actual depth 9008'MD, top of LTP= 8989'MD- corrected from PDS 4-21-
22 caliper)
DRAW TUBING DOWN TO 1100PSI, GAINED 800PSI IN 15MIN
TURN OVER TO OP'S TO PUT WELL IN TEST & SAME RESULTS
SET 3.81'' XX-PLUG IN X- NIP @ 8977'MD
DRAW TUBING DOWN TO 1500PSI, GAINED 70PSI IN 15 MIN
EQ & PULLED 3.81'' XX-PLUG FROM X-NIP @ 8977'MD
EQ & PULLED 2.31'' XX-PLUG FROM NS MONO-PAK LTP @ 9018'MD
*** JOB COMPLETE, WELL LEFT S/I***
**** 4.5" NSAK MONO-PAK PACKER w/ PTSA, SET IN ONE PIECE ASSEMBLY (
LIH 12.55' )****
Daily Report of Well Operations
PBU E-26B
PULLED PTSA & QCLL RECEPTICAL FROM DEPLY SLEEVE @ 8985'SLM/ 9,008'
MD
RAN 45 KB PACKER + PTSA DRIFT TO DEPLOYMENT SLEEVE @ 9018'MD
(tatteltale pins sheared & ring on no-go)
SET NS 45 MONO-PAK LTP ( lih 12.55') IN DEPLOYMENT SLEEVE @ 9018' MD
(gg)
@
BRUSHED DEPLOY SLV @ 9,018 MD
()
PULLED KB LTP FROM @ 8972' SLM / 9,004' SLM(elements in good condition, SSD @
closed, QCLL seals torn but intact))
Daily Report of Well Operations
PBU E-26B
4/9/2023
CTU #9 1.75" CT 0.156". Job Scope: Drift / RPM Log
MIRU CTU 9. MU NS 2.13" ctc/MHA w/ Slb 2" MBT w/ 2.25" DJN. Kill well w/ 1% kcl
w/ SL. RIH. Tag @ 11,743' CTM / 11,771' Mech. Wgt back @ 11,735.4 - corr Depth
to 11,770'. PUH 11,700' MD / 11,693' Mech Flag 1/2 White 1/2 Orange. POOH. BD
Slb Tools. MU Baker Atlas RPM Logging Tools. Re-kill well as RIH pumping down
backside.
***Continue on 4/10/23***
4/9/2023
(Assist CTU) TFS U-3, Pumped 26 bbls 60/40 and 654 bbls of 1% KCL with Safe
Lube assisting CTU. ***Job Continued on 4-10-23***
4/10/2023
CTU #9 1.75" CT 0.156". Job Scope: Drift / RPM Log
Finish RPM log. POOH, FP well with 7bbls 60/40 and 31bbls diesel. L/D BOT RPM
tools. Verify Good Data. RDMO CTU 9
***Job Complete***
4/10/2023
***Job Continued from 4-9-23*** (Assist CTU) TFS U-3, Pumped 71 BBLS 1%KCL,
31 BBLS DSL, and 7 BBLS 60/40 to ASSIST COIL.
4/26/2023
T/I/O=2600/550/0 (Assist slickline) TFS U-3. Pumped 32 bbls of crude down the
flowline to freeze protect and pressure up to 1500 psi. Pumped 208 bbls of crude
down the TBG to load and kill for slickline. ***Job continues to 4-27-23***
4/26/2023
***WELL FLOWING ON ARRIVAL***
LOADED TBG W/ 137 BBLS CRUDE.
BRUSHED X NIPPLE @ 9017' MD.
***WSR CONTINUED ON 4-27-23***
4/27/2023
***WSR CONTINUED FROM 4-26-23***
SET 2.31" XX PLUG @ 9017' MD.
T-BIRD TO ESTABLISH LLR: 1 bbl/min @ 375 psi. 2 bbls/min @ 1050 psi. 2.7 bbls
@ 1900 psi.
***WELL S/I ON DEPARTURE***
4/27/2023
***Job continues from 4-26-23*** (Assist Slickline) TFS U-3. Pumped 13 bbls of crude
down the TBG to try and pressure up to 1000 psi. Could not pressure up TBG to 1000
psi, max rate achieved 2.5 BPM @900 psi. pressure falls of after pump shut down.
Pumped 32 bbls of crude down the TBG to get a step rate LLR.
1 BPM@ 375 psi
2 BPM@ 1050 psi
2.7 BPM@ 1900 psi
Well left in control of slickline upon departure.
4/28/2023
T/I/O= 247/535/0 Temp= SI TFS-U3 Assist ELine Pumped 268 bbls Crude to
assist Eline with LDL, FWHP's= 406/520/0 All CV's= OTG Well left in Yellow
Jacket ELine control upon departure
Daily Report of Well Operations
PBU E-26B
4/28/2023
*** WELL S/I ON ARRIVAL*** ( LEAK DETECTION LOG)
PT 300L/3000H
PERFORM LEAK DETECTION LOG BASELINE TEMPERATURE PASS FROM
SURFACE TO TOP OF THE 9020' MD PLUG AT 9007'
OPEN TUBING TO FLOWLINE AND BEING PUMP DOWN TBG, TO GET
RETURND TO LEAK PATH ,PRESSURE UP TBG 2014 psi
AND CONFIRM THE LEAK IS ACTIVE. THUNDER BIRD ~ 2.7 BPM PERFORM 15
MIN STAGE ON TOP OF THE PLUG AT 9007' MD
INITIAL T/I/O= 250/500/0 psi , LEAK ACTIVATE T/I/O=2014/555/0 psi,
LOG UP PASS 30 FT/MIN FROM TOP OF THE PLUG TO 8900' MD
FOUND LEAK SIGNATURE AT 8990' PERFORM SATTION EVERY 10' FROM TOP
OF THE PLUG TO 8900' AND PULL LOG UP PASS TO SURFACE
NOT OTHER LEAKS FOUND.
LEAK DETECTION LOG COMPLETE,
***WELL S/I ON DEPARTURE***
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU
2SHUDWLRQV
3HUIRUPHG
2SHUDWRU1DPH
$GGUHVV
:HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$&)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO 2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWVUHTXLUHGSHU$$&
:HOO6WDWXVDIWHUZRUN
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
2,/ *$6
:,1- :$* *,1-
:'63/
*6725 6XVSHQGHG 63/8*
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
3%8(%
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH$QFKRUDJH$.
6XUIDFH
,QWHUPHGLDWH
/LQHU
/LQHU
/LQHU
[[
/
&RQGXFWRU
%DNHU6+\GUR6HW3DFNHU
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
1RHO1RFDV
1RHO1RFDV#KLOFRUSFRP
358'+2(%$<358'+2(2,/
7RWDO'HSWK
(IIHFWLYH'HSWK
PHDVXUHG
WUXHYHUWLFDO
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
PHDVXUHG
PHDVXUHG
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
3OXJV
-XQN
3DFNHU
0HDVXUHGGHSWK
7UXH9HUWLFDOGHSWK
IHHW
IHHW
3HUIRUDWLRQGHSWK
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
3DFNHUVDQG6669W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\
,QWHUYDOVWUHDWHGPHDVXUHG
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDO
5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
:HOO&ODVVDIWHUZRUN
([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV
&RSLHVRI/RJVDQG6XUYH\V5XQ
(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD
6XQGU\1XPEHURU1$LI&2([HPSW
$'/
1R6669,QVWDOOHG
1$
1$
1$
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
6U3HW(QJ 6U3HW*HR
)RUP5HYLVHG6XEPLW:LWKLQGD\VRU2SHUDWLRQV
6U5HV(QJ
UHFWWRWKHEHVWRIP\NQ
2FWREHU
By Anne Prysunka at 9:28 am, Oct 19, 2022
RBDMS JSB 102822
DSR-10/19/22MGR19OCT2022
$&7,9,7<'$7(6800$5<
&78&RLO-RE6FRSH'HSWK/RJ&,%3$GSHUI)OXLG6DPSOH
0,58&78087KXQGHUELUG&7&DQG%+$DQG+(6ORJJLQJWRROV
-RE&RQWLQXHGRQ
&RQWLQXH-REIURP:65
373&(SVL/RZSVL+LJK:HOOVWDFNHGRXWWRSVL5,+Z+(6
/RJJLQJ&DUULHU -611RLVVXHVSDVVLQJWKUX/737DJ3%7'DW
GRZQ
XS/RJISPXSWR
)ODJJHG3LSHDW
3RRK5HFHLYHG
JRRGGDWD
&RUUHFWLRQ&RUUHFWHG7DJ'HSWK
&RUUHODWHGWR%DNHU
+XJKHV0XOWLSOH3URSDJDWLRQ5HVLVWLYLW\*5/RJ0DUFK5,+Z7%LUG
$OSKD&,%37DJ/73DW
8QDEOHWRJHWWKUX3RRK&KHFNWRROVDW
VXUIDFH&,%3EUHDNVDWZHDNSRLQWDQGODQGVRQFORVHGVZDEYDOYH5HWUHLYHSOXJ
EXWDOOXSSHUVOLSSLHFHVPLVVLQJ'LVFXVVZLWK2(DQGGHFLGHWRPDNHYHQWXUL
UXQVWRUHWULHYHRUSXVKVOLSSLHFHVWRERWWRP087%LUGWRROV
,Q3URJUHVV
&RQWLQXH-REIURP:65
37%+$37/XEULFDWRUORZKLJK:HOOVWDFNHGWRSVL5,+ZLWK7
ELUG9HQWXULZ%XUQVKRH0DNHVHYHUDOSDVVHVWR/73322+DQG
FKHFNYHQWXUL1RVOLSSLHFHVUHFRYHUHG6ZDSWRYHQWXULZEXUQVKRH
DQG5,+7DJ/73DW
8QDEOHWRJHWWKUX3RRKWRSLFNXS0RWRU5,+
ZLWK0RWRU 9HQWXULZ%XUQVKRH5ROOWKUX/73DWESPZLWKQR
LVVXHV6ZDSWR6OLFN.&/ 9HQWXULGRZQ/LQHU$W
VXGGHQO\ORVWSVL
FLUFSUHVVXUH&RQWLQXHLQKROHWR
'HFLVLRQWRSRRK FKHFNWRROV$WVXUIDFH
WKH%LW%R[VKDIWEURNHRQWKH0RWRUOHDYLQJWKHELWER[9HQWXULDQG
%XUQVKRHLQKROH
/,+2$/
'LDJUDPSXWLQ:HOOV3LFWXUH)ROGHU
'LVFXVVMREZLWK2(6WDFNGRZQ FKDQJHSDFNRIIV7ULP
RISLSH6WDFNXS
DQG08QHZ&7&DQG0+$DQG+(6ORJJLQJWRROV37DQG5,+5HHOPDNLQJ
QRLVHVDGMXVWWLJKWHQZHGJHVRQUHHO\RNH+(6GHSWKER[QRWUHDGLQJUHSODFH+(6
GHSWKER[
-RELQ3URJUHVV
&RQWLQXH-REIURP:65
5HHOIL[HGDQG+(6GHSWKER[UHSODFHG5,+ZLWKORJJLQJ%+$WRORJDQGSXVKILVK
WRERWWRP3XVKILVKWR
EHIRUHVPDOOZHLJKWORVVVHHQ/RJIURP
WR
DQGIODJDW
322+DQGFKHFNIRUGDWDJRRGGDWD
FRUUHFWLRQ
087ELUG&,%3%+$5,+DQGFRUUHFWGHSKWWRWRSRISOXJDWIODJVHW&,%3DW
(/0322+DQGOD\GRZQSOXJ%+$0DNHXS+(6
JXQUXQ5,+
DQGWDJ&,%3&RUUHFWWRERWWRPVKRWDQG38DQGSHUIRUDWH
0'322+$OOVKRWVILUHGDQGEDOOUHFRYHUHG08+(6
JXQUXQDQG5,+
-RELQ3URJUHVV
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8(%
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8(%
&RQWLQXH-REIURP:65
&78ZLWK&7:7
&RQWLQXH5,+ZLWK+(6JXQUXQ7DJ&,%3DQGFRUUHFWGHSWKWRERWWRPVKRW
38DQGSHUIRUDWH
0'322+$OOVKRWVILUHGDQGEDOO
UHFRYHUHG%UHDNRIIVSHQWJXQVDQGSUHVVXUHWHVW0+$08JXQDQG5,+7DJ
&,%3DQGFRUUHFWGHSWKWRERWWRPVKRW38+DQGSHUIRUDWHLQWHUYDO
ZLWK+(60LOOHQQLXPJXQVVSIGHJUHHSKDVLQJ322+DQGOD\GRZQ
JXQVWULP
RISLSHDQGPDNHXSJXQUXQ5,+DQGWDJ&,%3GHHSHUWKDQ
H[SHFWHG38DQG5%,+DQGVWDUWHGSXVKLQJ&,%3GRZQKROH3XVKHG&,%3WRSXS
SHUIVDW
&RQVXOWZLWK2(DQGGHFLGHGWR322+DQGUHUXQSOXJM$WVXUIDFH
XQGHSOR\JXQVVWDFNGRZQDQGFKDQJHSDFNRIIV6WDFNXSDQG08%27&7&DQG
0+$ZLWK+(6ORJJLQJWRROV5,+WRUHORJ
-RELQ3URJUHVV
&RQWLQXH-REIURP:65
&78&RLO:7-RE2EMHFWLYH/RJ&,%3$GSHUI)OXLG6DPSOH
&RQWLQXH5,+ZLWK/RJJLQJ%+$7DJSOXJDW
DWWHPSWWRSXVKSOXJGRZQKROH
EXWFRXOGQRWJHWWRPRYH/RJRXWRIKROHDQGIODJSLSHDW
322+DQG
GRZQORDGGDWDGHWHUPLQHGZHKDGD
FRUUHFWLRQDQGSOXJKDVPRYHGa
XS
KROH0816&,%35,+DQGFRUUHFWGHSWKDWIODJ&RQWLQXHLQKROHDQGVHWWRS
RI&,%3DW
322+DQGOD\GRZQVHWWLQJWRRO0DNHXS+(6JXQUXQ5,+
DQGWDJ&,%3DQGFRUUHFWWRERWWRPVKRW38DQGSHUIRUDWHIURP
0'38LQWRWXELQJDQGIORZZHOO
-RELQ3URJUHVV
&RQWLQXH-REIURP:65
&78&RLO:7-RE2EMHFWLYH/RJ&,%3$GSHUI)OXLGVDPSOH
&RQWLQXHIORZZHOOIRUZHOOERUHYROXPHV'LVFXVVHGSODQIRUZDUGZLWKWKH2(DQG
5HVHQJLQHHUDQGGHFLGHGWRVKXWLQZHOOZKLOH%23WHVWLQJDQG08WRROV6,ZHOO
DQG322+OD\GRZQJXQUXQ3HUIRUPGD\%23WHVW08%27&7&DQG0+$
DQG6/%VDPSOLQJWRROV
-RELQ3URJUHVV
&RQWLQXH-REIURP:65
&78&RLO:7-RE2EMHFWLYH/RJ&,%3$GSHUI)OXLG6DPSOH
086/%IOXLGVDPSOHUWLPHUVHWIRUKUV6WDERQZHOOSUHVVXUHWHVWDQG5,+WR
&70'ZDLWIRUVDPSOHWRROWRF\FOHRSHQDQGFORVHWKHQ322+/D\GRZQ
VDPSOHWRRODOOLQGLFDWLQVVDPSOHVDUHJRRG08VDPSOHWRRODQG5,+WR
DQGZDLWIRUVDPSOHWRROWRF\FOHRSHQDQGFORVHG322+DQGOD\GRZQVDPSOHWRROV
RIWKHVDPSOHWRROVGLGQRWRSHQGRZQKROH5'02&78
-RE&RPSOHWH
By Anne Prysunka at 10:30 am, Aug 12, 2022
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
By Meredith Guhl at 9:54 am, May 04, 2022
G
Completed
4/5/2022
MDG
RBDMS 5/4/2022 MDG
DSR-5/4/22MGR24AUG2022SFD 8/11/2022
5.3.2022Digitally signed by Monty M Myers
DN: cn=Monty M Myers, c=US,
o=Hilcorp Alaska, LLC, ou=Technical
Services - AK Drilling,
email=mmyers@hilcorp.com
Reason: I am approving this document
Date: 2022.05.03 13:41:14 -08'00'
Monty M
Myers
Activity Date Ops Summary
3/16/2022 Continue rig move to E-26B. Both modules on location. Spot modules and being backing in. Switch to stompers due to tight location. Lower stairs and landings.
Hook up Putz and flow line. Lay out cellar liner and put down duck ponds. Spot return tank and rig up return line - PT to 4250 psi RU steam lines and begin
warming up rig. Safe out cellar and chink. Install pressure bulkhead on coil reel - MEG good. Leak Test tree. Remove tree cap. Install 4 1/16" x 7 1/16" adaptor
flange. Stab BOP's. NU BOP's and MPD line.
3/17/2022 Finish nipple up of BOPE and MPD line. Reconfigure risers. Service BOPE stack and choke manifold. Make up test joint for Big hole stack. Electrician
troubleshooting connection issue between BHI and Bulkhead. Bad cable end from putz. Begin fluid pack on stack. Ram door leaking. Vac out stack. Replace door
seal on 3" pipe/ slips(off drillers side). Begin shell test of BOPE again Ram door leaking. Replace door seal on 3" pipe/slips(drillers side). Test Gas alarms: Pit H2S
Fail / Recalibrate / Pass. Begin BOP test per PTD/Sundry. Test 1:C7, C9, C10, C11. Test 2: B/S, R2, B2, C15. Install Tree cap with 2-3/8" x 3.0" Multi joint. Test 3:
Annular, TIW, B1, B4. Test 4: 2-3/8" Upper P/S, TIW #2, B2, B3. Test 5: Lower 2-3/8" P/S, C5, C6, C8, TV2. Test 6: Choke A, Choke C. Drawdown test on
Accumulator Test 7: C1, C4, TV 1. Test8: 3" P/S, C2, C3 LD test joint and BOP test equipment. Clear and Clean rig floor. Swap out test riser for drilling riser. Install
drip pan on riser. Measure RKB's. MU injector to well Begin fluid packing coil. Pump ~ 5 bbls of MeOH followed by fresh water. Pump coil volume of fresh water.
Test Inner Reel Valve to 3500 psi. Test Pack-offs to 3500 psi.
3/18/2022 RU Off drillers side PDL, Pressure test 3500#. RU Driller side PDL, Pressure test to 3500#. Test MPD line also. Install floats. Test to 3500# Good test. Install test
cap on UQC. Pressure stack to 3500#. Line up down coil. Pressure up to 6750# on Inner reel iron and bulkhead. Good test. Finish loading reel with 1% KCL.
Calibrate MM's. PJSM for Bullhead ops. Load MPD line up to stack with MEOH spear. Pause- Let Highline crew finish putting us on highline power. On highline @
16:45. Pressure up to 2700#. Open well with 2390# wellhead pressure. Bullhead kill. - 10 bbls Methanol spear. - 120 bbls away @ 0 psi. - 250 bbls away @ 5 psi.
Shut down and monitor. Troubleshoot frozen return line to TT. Continue to fill hole with 1% KCL using charge pump. Return line thawed out. Confirm with air to
Tiger Tank. Pressure test return line to 4250 psi. Attempt to fill hole and unable to keep up with loss rate. Pumped 80bbls and no returns at surface. Discuss
options with Drilling Engineer and CTD Foreman Prep to pump Polyswell pill for LCM. Pump 30 bbl, 20 ppb polyswell stage. Pump 15 bbl Fresh Water tail. Chase
polyswell and fresh water with 1% S KCL. Pump until tail of fresh water is ~ 9300'. 5 bpm and 1900 psi final pressure during placement of polyswell. Wait 1 hr and
attempt to fill hole Wait one hour for polyswell to set. Pump down tubing with 1% S KCL for hole fill. Pump 11 bbls and tubing started to pressure up. Shut down
pump and flow check well. Pumped 7 bbls after 15 minutes to fill well. Well taking ~ 28 bph. MU Baker 4 1/2" mono bore whipstock. MU BHI CoilTrak. BHA. RIH
w/BHA #1: Baker 4 1/2" monobore whipstock. Taking weight @ 9100' 5k down. Attempt to PUH and over pull 18k(70k coil weight). Pump 1 bpm through open EDC.
Attempt to orient and free BHA. Stop pumping and close EDC. Pull -15k WOB and hold tension. Pull free with 20k over pull. POOH and discuss plan forward with
Drilling Engineer.
3/19/2022 Puh dragging. Took weight at 9058' MD. Orient without issue. PUH to -20K. Pulled free. Pooh with whipstock BHA. Using caution with possible whipstock issue.
PJSM. Perform 10 min no flow / loss rate. Fill hole after 15 min. Took 7 bbls. Lay down BHA#1. Whipstock setting tool. Discuss with drilling engineer. Never tied in
before whipstock was pre set. Rih with BHA#2 MWD and 2.75" JSN with 3/4" ball on seat. Rate: 0.56 bpm in, 0.12 bpm out. Circ pressure: 275 psi. Mud Weight:
8.4 ppg in, 8.4 ppg out. Log down for tie-in from 8890’ to 8940.47’ MD (JB Marker) with -10'’ correction. Log CCL from 8930.47' to 9031' MD. Compared. Log CCL
from 8930.47' to 9031' MD. Compared depths to tubing tally. On depth. Rih slowly and find whipstock at 9045' MD. WLEG at 9044.1', Top of scoop guide at 9045'
MD. PU off whipstock. Bring rate up to 2.5 bpm. Circulate 2 bottoms up. Nothing seen. Pooh. Rate:2.5 bpm in, 1.80 bpm out. Mud Weight: 8.4 ppg in, 8.4 ppg out
OOH - flow check well. Fill hole after 15 min. ~ 40 bph loss rate. LD nozzle and recover ball. MU Baker whipstock fishing BHA RIH w/BHA #3 Baker Skirted Catch G
Spear. Loss rate on trip in hole ~ 40 bph. Log Tie-In from 8890'. Correct -4.5'. PUW @ 8900' = 46k. RIW = 28k. Attempt to engage whipstock fish @ 9043.8' with
5k WOB. PU Clean - no fish. RIH and pushed whipstock to 9088'. Set weight and attempt to PU. PU clean. PUH to 9000' and no indication of fish through TT or
jewelry. RIH to set down again and able to RIH freely. WT CK @ 9150' = 50k. Tag @ 9170' with 7k down weight. Repeat @ 9175'. POOH to check for whipstock
fish. Rate 1.94 bpm in, 1.07 bpm out. -Mud Weight: 8.41 in, 8.51 out OOH - fill well and break QTS. LD BHI BHA. LD fishing tools and whipstock FISH MU and RIH
w/BHI Milling BHA w/3.79" D311 and string reamer. Fill coil and verify motor differential pressure. Continue RIH @ 9000'.
3/20/2022 Cleanout run. Log down for tie-in from 8950’ to 9012.48' MD (JB Marker) with -9' correction. Free spin: 1800 psi, 2.73 bpm. Rate: 2.73 bpm in, 2.08 bpm out. Circ
pressure: 1800 psi. Mud weight: 8.39 ppg in, 8.40 ppg out, ECD: 8.61 ppg. - 9170' bobble of motor work. PU clean with 45K Wash down to 9400' with no sign of
anything. Minimal motor work seen. PU and log tie in to SAG markers +4.5' correction. Pump 20 bbls of 130K LSRV Sweep. Out bit at 9400'. Chase up and out.
Polyswell / Paraffin coming back. Come offline on pump. Log CCL / Dry drift from 9000' MD to 9408' MD. Clean pass all the way down. Everything coming in 3'
deep. PU and verify tie in to SAG markers. Tie in 0' correction. Pump 26 bbl of 130K LSRV sweep. Chase out of hole from 9370'MD. Pull 30 fpm up to above
jewelry. Sweep at surface. Nothing to note. Clean sweep. Pooh. Mud Weight: 8.41 ppg in, 8.52 ppg out. Rate: 2.71 bpm in, 1.82 bpm out. Perform 150' jog at
surface. Open EDC. Perform 10 min flow / loss check. Losing 28 bph. Fill hole while tagging up. BHA swap. Lay down Cleanout BHA#4. Swap mill and string
reamer out for window mill and reamer. Stand-back. Swap out lowers on MWD package. Make up BOT whipstock. Tag up. Verify EDC open. RIH with BOT
Whipstock BHA #5. Rate: 0.92 bpm in, 0.73 bpm out. Circ pressure: 552 psi. Mud Weight: 8.39 ppg in, 8.43 ppg out. Log down for tie-in from 9235’ to 9280.13’ MD
(SAG Marker) with -7’ correction. PUW 46K, SOW 27K Rih to set depth of 9297.45' (9285' Top). Pressure up to 3600 psi and release from whipstock. TOWS:
9285’ md. BOWS: 9297.45’ md. Set 180° ROHS. Confirm set with 3.3k down weight. Pick off clean. Pooh. Mud Weight: 8.40 ppg in, 8.40 ppg out. Rate: 1.30 bpm
in, 0.61 bpm out. LD whipstock setting tool. MU window milling BHA. RIH w/BHA #6 - Window Milling BHA. Mud Weight: 8.39 ppg in, 8.51 ppg out. Rate: .51 bpm
in, .37 bpm out. Fix injector counter issues - gummed up wheel. Log Tie-In from 8930' - correct +30'. Dry tag top of whipstock @ 9283'. Establish free spin and get
parameters. 47k PUW. Free Spin @ 2.5 bpm = 1740 psi. Mud Weight: 8.38 ppg in, 8.42 ppg out. Rate: 2.51 bpm in, 1.87 bpm out. Begin milling window per BOT
representative from 9282.3'. Continue milling window from 9285.1'. Mud Weight: 8.40 ppg in, 8.52 ppg out. Rate: 2.49 bpm in, 1.91 bpm out.
50-029-21781-02-00API #:
Well Name:
Field:
County/State:
PBW E-26B
Prudhoe Bay West
Hilcorp Energy Company Composite Report
, Alaska
3/21/2022Spud Date:
3/21/2022 Continue Milling 3.80” window in 4-1/2” liner per BOT 9285.1’ md to 9288.6’ md. Rate: 2.49 bpm in, 1.92 bpm out. Mud Weight: 8.40 ppg in, 8.51 ppg out.
DWOB: 3.0-4.0klbs. Circ pressure: 2526 psi. Appear we are out. Let string reamer mill out. Mill rathole. 9289.6-9299.6. Rate: 2.47 bpm in, 1.91 bpm out. Mud
Weight: 8.40 ppg in, 8.51 ppg out. DWOB: 0.5- 2.0 klbs. Circ pressure: 2726 psi. ROP 12 fph. Looks like we are drilling formation. Perform reaming passes.
Attempt dry drift. Took weight at 9284'. Perform 4 more passes. Mild motor work. seen initially. Cleaned up. Dry drifted clean. Pumped 15 bbls HiVis sweep. Pooh
from TD. SAG sample confirmed. Pooh. Mud Weight: 8.40 ppg in, 8.51 ppg out. Rate: 2.80 bpm in, 2.79 bpm out. Perform 10 min no-flow. Fill hole. Loss rate 24
bph. Lay down BHA#6. Mill and reamer both 3.79" No-Go MU and deploy BHA #7 - Build BHA. 2 7/8" ULS Motor and 3.75" x 4.25" Bi-Center Bit. RIH w/BHA #7. In
Rate = .55 bpm, Out Rate = .38 bpm. MW In = 8.45 ppg, MW out = 8.51 ppg. Log Tie-In from 9210' Correct -6'. Displace coil and well to PowerPro drilling mud
system. Close EDC and begin drilling build section. Tag bottom of rat hole @ 9301'. Begin drilling build section from 9298'. In Rate = 2.53 bpm , Out Rate = 1.45
bpm. MW In = 8.64 ppg , MW Out = 8.71 ppg. Free spin = 2600 psi. ROP = 50 - 70 fph. PUH and investigate tool failure - cycled power and came back on.
Continue drilling build section from 9380' to 9430'. In Rate = 2.51 bpm , Out Rate = 1.99 bpm. MW In = 8.68 ppg , MW Out = 8.81 ppg. Free spin = 2600 psi. ROP
= 12 - 20 fph. WOB = 3k. Continue drilling build section from 9430' to 9443'. In Rate = 2.48 bpm , Out Rate = 1.99 bpm. MW In = 8.69 ppg , MW Out = 8.85 ppg.
Free spin = 2688 psi. ROP = 12 - 20 fph. WOB = 3k. IA = 393, OA = 0 Coil counter gummed up and slipping. Clean and confirm working. Wiper trip to window to
Tie-In. Log tie-in and correct -6' Continue drilling build section from 9437' to 9451'. In Rate = 2.45 bpm , Out Rate = 2.03 bpm. MW In = 8.71 ppg , MW Out = 8.85
ppg. Free spin = 2641 psi. ROP = 5 - 20 fph. WOB = 2.5 - 3k. IA = 254, OA = 0.
3/22/2022 Drill 4.25" build from 9251’ MD to 9499’ MD. Free spin: 3250 psi, 2.99 bpm. Rate: 2.99 bpm in, 2.58 bpm out. Circ pressure: 3250 – 3491 psi. Mud weight: 8,72
ppg in, 8.85 ppg out, ECD: 9.57 ppg. ROP: 47 fph, WOB: 1.5 – 3.0 KLBS. Start taking more losses. Drill 4.25" build from 9499’ MD to 9600'. Cuttings not healing
losses. Free spin: 3250 psi, 2.99 bpm. Rate: 2.99 bpm in, 1.06 bpm out. Circ pressure: 3250 – 3491 psi. Mud weight: 8,72 ppg in, 8.85 ppg out, ECD: 9.50 ppg.
ROP: 47 fph, WOB: 1.5 – 3.0 KLBS. Wiper to window. Perform Jog. Pull through window without issue. Open EDC. Jet tray while performing tie in and RA log on
whipstock. 0 correction. Bring rate up to 4.5 bpm in and 2.85 bpm out. Wiper up to 8200'. Pump sweeps. Pump to surface. Pre Polyswell injectivity test. Close
choke. 2.0 bpm @ 290 psi. 2.5 bpm @ 307 psi. 3.0 bpm @ 350 psi. Break circulation at minimum rate to keep hole full. Prep pits for Pumping Polyswell Circulate
Polyswell down coil. 28 bbls of 11.0 ppb in 8.6 ppg Powerpro 6% KCL. 5 bbls of 8.6 ppg Powerpro. 20 bbls Freshwater . Chase with Active mud system. Once
Polyswell at EDC. Close choke. Bullhead to thief zone. Spot Pill in well. Close EDC. Flush BHA. Wait on polyswell to hydrate. Break circulation. 0.75 bpm and start
to build fluid column. Come offline and monitor BHP on PWD. Run in hole. No Pumps. Close EDC. Drill 4.25" build from 9605' MD. Free spin: 3048 psi, 2.75 bpm.
Rate: 2.75 bpm in, 1.30 bpm out. Circ pressure: 3067 - 3238psi. Mud weight: 8,69 ppg in, 8.83 ppg out, ECD: 9.45ppg. ROP: 16 fph, WOB: 2.4 – 3.5 KLBS.
Circulate 20 bbls of freshwater to bit. Close choke. Force freshwater into fracture. Drill 4.25" build from 9614. Free spin: 3048 psi, 2.75 bpm. Rate: 2.76 bpm in, 1.35
bpm out. Circ pressure: 3048- 3238psi. Mud weight: 8,67 ppg in, 8.82 ppg out, ECD: 9.44ppg. ROP: 16 fph, WOB: 2.4 – 3.5 KLBS. Wiper trip to window from
9690'. Sample bottoms up for Geo and confirm HOT. Rate: 2.83 bpm in, 1.24 bpm out. Circ pressure: 3048- 3238psi. Mud weight: 8.69 ppg in, 8.81 ppg out, ECD:
9.39 ppg Wiper trip from 9690' to confirm sample of HOT.Pump Lo/Hi vis sweep. Rate: 2.76 bpm in, 1.40 bpm out. Circ pressure: 3048- 3238psi. Mud weight: 8.69
ppg in, 8.85 ppg out, ECD: 9.41ppg Drill to 9701' and sample bottoms up for HOT. Rate: 2.78 bpm in, 1.27 bpm out. Circ pressure: 3042- 3212psi. Mud weight:
8.67 ppg in, 8.80 ppg out, ECD: 9.31 ppg Drill 4.25" build from 9700' to 9741'. Rate: 2.55 bpm in, 1.05 bpm out. Circ pressure: 2938 - 3212psi. Mud weight: 8.68
ppg in, 8.80 ppg out, ECD: 9.32 ppg.ROP = 45 - 60 fph. WOB = 3.5 - 4 klbs Wiper trip to window and sample bottoms up from 9741'. Rate: 2.74 bpm in, 1.32 bpm
out. Circ pressure: 2938 - 3076 psi. Mud weight: 8.66 ppg in, 8.80 ppg out, ECD: 9.36 ppg. Pump 10 bbl 130k LSRV pill. Confirm traces of HOT in bottoms up
sample Drill 4.25" build from 9741' - 9786'. Rate: 2.87 bpm in, 1.32 bpm out. Circ pressure: 2938 - 3212psi. Mud weight: 8.68 ppg in, 8.81 ppg out, ECD: 9.39
ppg. ROP = 45 - 60 fph. WOB = 3.5 - 4 klbs. Confirm HOT sample in bottoms up.
3/23/2022 Drill 4.25" build from 9680 to 9805' MD. Land Build. Free spin: 3148 psi, 2.78 bpm. Rate: 2.78 bpm in, 1.39 bpm out. Circ pressure: 3148 - 3237psi Losses 83
bph. Mud weight: 8,68 ppg in, 8.80 ppg out, ECD: 9.43ppg. ROP: 7-16 fph, WOB: 3.5- 5.5 KLBS . Pooh for lateral. Mud Weight: 8.69 ppg in, 8.81 ppg out. Rate:
2.78 bpm in, 1.45 bpm out. Open EDC, POH from 9260’ MD to surface. Rate: 4.34 bpm. Circ pressure: 4336 psi Assess loss rate. 30 bph at surface. Pull BHA#7
out of hole. Lay down and re-bend motor. Bit grade 3-3-RO-A-X-I-BT-BHA Perform weekly function test. Cycle all rams. Changed Packoffs, PT to 3500# Perform
injectivity test down MPD line (Pre Polyswell). Perform 3 bpm @ 520 psi with 10 bbls . Pump 30 bbls 20 ppb Polyswell (Wet @ 14:00). Pump 10 bbls 8.6#
Stripped mud. Pump 30 bbls Freshwater. Placed 20 bbls in fractures. Step rate down. Let soak for 1hr. Open swab valve. Circulate across top. 1:1 at WOC. Start
applying some squeeze pressure. Worked up to 400 psi. Loses are very minimal. Squeeze freshwater down to polyswell. RIH with 4.25” drilling BHA #8. - Rate:
0.58 bpm in, 0.73 bpm out. Circ pressure: 981 psi. Shallow hole test agitator is good. Mud Weight: 8.71 ppg in, 8.83 ppg out. Log down for tie-in from 9210’ to
9266’ MD (SAG Marker) with -4.5’ correction. Pass through window no issues. RIH bring rate up to get returns 1.2 / 0.8 bpm. Clean pass to bottom. Drill from 9805'.
2.93 / 2.08 bpm @ 4220 psi free spin. MW 8.70 / 8.80 ppg In / Out. At 9900' pump 5 bbls lo / hi vis sweeps. ECD 9.56 ppg at window on open choke. Drill to 9923'
and diff pressure drills off. Try to pick up and can't, differentially stuck. Have full circulation. Able to orient freely. Work pipe 5k to 95k, see some reaction on DWOB.
Cycle pumps 0 to 2.9 bpm, pop free at 0 pump. Pull 150' wiper. Continue drilling from 9920'. 2.85 / 1.78 bpm @ 4000 psi free spin. MW 8.72 / 8.85 ppg In / Out
ECD = 9.51 ppg at window. Frequent pickups when differential pressure falls off. At 9967' pump 5 bbls lo / hi vis sweeps. Depth wheel is gumming up, troubleshoot.
Pick up for wiper trip to window and to tie-in depth. Log whipstock RA, correct +14'. Run back to bottom. Drill from 9972' to 9988'. Stacking wt at 9988', pickup is
64k. Pull off bottom about 20 ft, can't turn around, stuck 20' off bottom. Cycle pipe 5k to 90k, shut off pump and relax hole, no movement. PJSM then line up to
pump 20 bbls LVT and 10 bbls spacers. Manually pump injector traction up for 100k pull. With 7 bbls LVT out pick up and pipe is free at 60k. Circ LVT and spacers
uphole. Run back to bottom. Drill from 9986' to 10000'. Frequent pickups. Continue drilling from 10046'. Phase 3 is called, wiper trip to window. Pull through
window and jog, then open EDC.
3/24/2022 Phase III conditions continued: Swapped out personnel. Circulated across the top. Phase conditions dropped to II. Back to bottom with 4.25” drilling BHA #8. Rate:
1.05 bpm in, 0.87 bpm out. Circ pressure: 1907 psi. Mud Weight: 8.69 ppg in, 8.63 ppg out. Log down for tie-in from 9283’ to 9266.38’ MD (SAG Marker) with +2’
correction Drill 4.25” lateral from 10046’ MD to 10108’ MD. Free spin: 3807 psi, 2.82 bpm. Rate: 2.82 bpm in, 1.66 bpm out. Circ pressure:3807 – psi. Mud weight:
8.70 ppg in, 8.80 ppg out, ECD: 9.47 ppg. ROP: 100 fph, WOB: 3.0 KLBS. Motor work fell away and WOB came up. Pickup and differentially stuck. Orienter free.
Shut pumps down. Let relax for 10 min. Pull to free at 96K. Drill 4.25” lateral from 10108’ MD to 10235'MD. Rate: 2.84 bpm in, 1.48 bpm out. Circ pressure:3886 –
4134 psi. Mud weight: 8.70 ppg in, 8.84 ppg out, ECD: 9.50 ppg. ROP: 65 fph, WOB: 3.0- 3.5 KLBS. Lost 0.25 bpm out rate for about 2 bbls then got it back.
Looks like a fracture. Drill 4.25” lateral from 10235'MD to 10310'. Rate: 2.82 bpm in, 1.69 bpm out. Circ pressure:3886 – 4106 psi. Mud weight: 8.71 ppg in, 8.84
ppg out, ECD: 9.49 ppg. ROP: 15 fph, WOB: 3.0- 3.5 KLBS. Continue drilling from 10310' to 10370' with slow ROP. At 10325' pull 100' wiper. At 10330' pump 5
bbls lo / hi vis sweeps. MW 8.76 / 8.86 ppg In / Out. Window ECD 9.55 ppg on open choke. At 10355' pull 100' wiper, clean pass. Continue drilling from 10370' to
10375'. Pump 5 bbls lo / hi vis sweeps around. Drill to 10375'. POOH due to sustained low ROP. Dynamic loss rate on bottom is 60 bbl/hr. Discuss with ODE, keep
9.6# ECD at window for trip due to exposed shale from 10300' to 10340'. Pull through window and jog, then open EDC. POOH 3.86 / 2.3 bpm 9.65# ECD at
window. Lot of cuttings returned. Jog at surface then test agitator, good. Assess loss rate and flow check, about 28 bbl/hr. Lift off and check CT for flat spots,
nothing seen. Lift BHA out and change bit, run it back in. Bit is 3-1 WO. M/U injector. RIH. Keep 9.6# ECD at window. Tie-in depth.
3/25/2022 RIH with 4.25” drilling BHA #9 to 10375' MD. Log down for tie-in from 9230’ to 9253’ MD (SAG marker) with -6' correction. Run through window without issue. Rate:
2.82 bpm in, 1.55 bpm out. Circ pressure: 4058 psi. Mud Weight: 8.71 ppg in, 8.83 ppg out. PU and swap to one pump. Drill 4.25” lateral from 10502 MD to 10542'
MD. Free spin: 3953 psi, 2.83 bpm. Rate: 2.83 bpm in, 1.88 bpm out. Circ pressure: 3953 – 4099 psi. Mud weight: 8.72 ppg in, 8.85 ppg out, ECD: 9.60 ppg. ROP:
25-30 fph, WOB: 3.5– 4.0 KLBS. Pull 100' BHA wiper. Drill 4.25” lateral from 10542' MD to 10590' MD. Free spin: 3959 psi, 2.84 bpm. Rate: 2.84 bpm in, 1.88 bpm
out. Circ pressure: 3959 – 4099 psi. Mud weight: 8.73 ppg in, 8.86 ppg out, ECD: 9.60 ppg. ROP: 25-30 fph, WOB: 3.5– 4.0 KLBS. ROP down to nothing. Stalling
everytime we touch bottom. Perform 300' wiper. Free spin: 4061 psi, 2.87 bpm. Rate: 2.87 bpm in, 1.68 bpm out. Circ pressure: 4061 – 4099 psi. Mud weight: 8.73
ppg in, 8.85 ppg out, ECD: 9.54 ppg. Immediate stall. Pooh to inspect bit and motor. Pooh. Mud Weight: 8.73 ppg in, 8.88 ppg out. Rate: 3.93 bpm in, 2.71 bpm
out. Dynamic across top. Look like minimal. Perform flow check. Lay down BHA. Bit graded: 7-1-CR-N-X-I-CT-PR. M/U BHA #10 with Hyc Duraforce 3.75" x 4.25"
bit. M/U injector. RIH. Apply 9.6# ECD. Test agitator at 200', good. Continue RIH. Log tie-in from 9220'. Correct -6'. Up wt 45k. Close EDC and RIH. No issue
through window. RIH to bottom. Drill from 10592'. 2.8 / 1.62 bpm with 9.55# ECD at window. MW 8.69 / 8.82 ppg In / Out. Initial ROP 30 ft/hr with 2-3k DWOB.
After 10600' ROP > 100 ft/hr. Pump 5 bbls lo / hi vis sweeps. At 10672' abrupt change in drilling parameters. Pickup is 62k, nothing extra seen on DWOB. Drill from
10673' to 10675'. Diff pressure drills off, try to pick up and can't. Have full circulation, able to orient freely. Cycle pipe 10k to 90k 5x., no movement. Seeing some
reaction on DWOB. Line up to pump LVT. Pump 14 bbls LVT + spacers. With 3 bbls LVT out pull free with 50k up wt. Pull 200' wiper circulate LVT and spacers
uphole. Drill from 10670'. Frequent pickups. Start building angle to level off. MW 8.67 / 8.85 ppg In / Out. Free spin 4180 psi 2.92 / 1.8 bpm. ECD 9.68 ppg on
open choke. At 10711' pull 200' wiper, pump 10 bbls lo / hi vis. Pull wiper from 10711'. Dragging 2-3k continue wiper to window. Pulling 7k over at 9970'. Nothing
seen on DWOB. Work pipe up and down and cycle pump to clear, continue wiper. Pull through window and jog then open EDC. Ease rate up slowly through open
EDC. Pump 3.9 / 2.8 bpm to clean tubing. Pump 5 bbls lo / hi vis sweeps around. Log tie-in from 9230'. Jet whipstock tray with open EDC. Close EDC and RIH.
Pass window with no issues. RIH to 10000', pull back to window. Pull heavy at 9870, run back in. Pump 5 bbls lo / hi vis. Recip CT below tight spot, pump sweeps
around. Pull through slowly 10 ft/min.
3/26/2022 Appears cuttings are accumulating in sump. Pulled slowly through sump at 10 fpm. Performed jog at window. Pulled through without issue. Open EDC, Jet wellbore
with 10bbls of 130K LSRV. Pump a bottoms up. Cuttings came back, but minimal. RIH back to bottom with 4.25" drilling BHA #9. Rate: 1.0 bpm in, 0 bpm out. Circ
pressure: 1100 psi. Mud Weight: 8.71 ppg in, 8.82 ppg out. Drill 4.25" lateral from 10711’ MD to 10763' MD. Free spin: 3856 psi, 2.77 bpm. Rate: 2.79 bpm in,
1.87 bpm out. Circ pressure: 3856 – 4150 psi. Mud weight: 8.71 ppg in, 8.82 ppg out, ECD: 9.66ppg. ROP: 71 fph, WOB: 2.5- 4.0 KLBS. Differential sticking. Drill
4.25" lateral from 10763' MD 10896'. Free spin: 4169 psi, 2.99 bpm. Rate: 2.99 bpm in, 1.99 bpm out. Circ pressure: 4169 – 4425 psi. Mud weight: 8.69 ppg in,
8.83 ppg out, ECD: 9.72ppg. ROP: 71 fph, WOB: 2.- 3.5 KLBS. Crossed unmapped fault at 10795' MD. Wiper Trip (Geology). Pump 10 bbl LoVis / 10 bbls HI VIs
sweeps. Chase up hole through sump. Pull 10 fpm. Log RA tie in to verify tie in. Bobbled by 9400' like previous trips. Drill 4.25" lateral from 10896' to 10980'. Free
spin: 4047 psi, 2.99 bpm. Rate: 2.95 bpm in, 1.95 bpm out. Circ pressure: 4047 - 4319 psi. Mud weight: 8.74 ppg in, 8.85 ppg out, ECD: 9.75 ppg. ROP: 18-30
fph, WOB: 2.- 3.5 KLBS. Drilling slows at 10980'. Pickup is clean. Continue drilling from 10980' to 11041'. MW 8.72 / 8.86 ppg In / Out. 2.95 / 2.1 bpm with 9.68
ppg ECD. Drill to 11016' pull 100' wiper. Pump 10 bbls lo / hi vis sweeps. Frequent pickups, diff sticking. Pull 100' wiper from 11045'. Clean pass up and down.
Drill from 11045' with frequent pickups and short wipers. ROP is 30 - 50 ft/hr with 2-4k DWOB. 2.99 / 2.03 bpm 4100 psi free spin. Pump 10 bbls lo / hi vis sweeps
at 11070'. Drill to 11089'. Drill to 11089'. Poor steerability and ROP. POOH. Dynamic loss rate 50 - 60 bbl/hr on bottom. Pump 10 bbls lo / hi vis sweeps chase
through sump. Slow to 10 ft/min. Mostly clean, about 2-3k drag through sump. Pull through window 53k. Jog above window then open EDC. Jet whipstock tray.
POOH, pulling 54k at 9185' inside the tubing. RIH and jog, pull through slotted liner slower. Still pulling 51k up to 8960'. Pump 10 bbls lo / hi vis sweeps. Pumping
3.73 / 2.82 bpm no annular pressure increase. BHA jog at 8900' then POOH. Hold 9.65# ECD at window. Shallow hole test agitator at 350', good. Tag stripper.
Assess losses and flow check. Lift injector off and slide back. L/D BHA #10.
3/27/2022 Lay down MWD upper section, motor, and bit. Bit graded 6-4-CR-N-X-I-RO-PR. PU new motor (1.2 deg AKO), New 4.25" HYC bit. Make up injector. Break
circulation and put well back on choke for 9.6 ppg ECD RIH with 4.25” drilling BHA #11. Rate: 0.94 bpm in, 0.38 bpm out. Circ pressure: 1596 psi. Mud Weight:
8.69 ppg in, 8.82 ppg out. PUW 42K, SOW 27.5K. Log down for tie-in from 9230' ’ to 9263’ MD with 0’ correction. Close EDC, Run to bottom. Tag at 9794'. Drill
4.25" lateral from 11090’ MD to 11153'. Free spin: 4352 psi, 3.00 bpm. Rate: 3.0 bpm in, 2.11 bpm out. Circ pressure: 4352 – 4567 psi. Mud weight: 8.68 ppg in,
8.81 ppg out, ECD: 9.63 ppg. ROP: 35 fph, WOB: 2.5 – 3.0 KLBS Drill 4.25" lateral from 11153' to 11192' . Free spin: 4286 psi, 2.98 bpm. Rate: 2.98 bpm in, 2.12
bpm out. Circ pressure: 4286 – 4635 psi. Mud weight: 8.69 ppg in, 8.84 ppg out, ECD: 9.64 ppg. ROP: 35 fph, WOB: 2.5 – 3.0 KLBS. Drill 4.25" lateral from
11192' to 11281'. Free spin: 4265 psi, 2.96 bpm. Rate: 2.96 bpm in, 2.03 bpm out. Circ pressure: 4265 – 4635 psi. Mud weight: 8.69 ppg in, 8.83 ppg out, ECD:
9.65 ppg. ROP: 25-35 fph, WOB: 2.5 – 3.0 KLBS. Pump packing leaking worse, Wiper to window. Wiper through sump. Pump 10 bbls LoVis / 10 bbls Hivis. No
issues coming through sump. Perform jog at window. Pull through without issue. Pullup to 9100' Open EDC. Change packing on pump #1. Continue circulating
with pump #2. Swap to pump #1, continue circulating. Change packing on pump #2. Unable to circ with pump #2, troubleshoot. Continue circulating with pump #1.
Find suction spring retainer clip is damaged on pump#2. Get new one from CDR3. Wait on pump part from CDR3. Circ above window keep 9.70# ECD. Pump 1.96
/ 1.00 bpm with 109 psi WHP. Install part and test #2 pump, good. RIH to 9230' to tie-in depth. Correct -4'. Close EDC and RIH. Tag at 9292', bottom window. Up wt
is 47k. Pick up and circulate then try again, 0 pump. Pass window go to 0.9 bpm. Continue RIH. Clean pass to bottom. Drill from 11280' to 11430'. 2.92 / 2.02 bpm
@ 4300 psi free spin. MW 8.71 / 8.83 ppg In / Out. Initial ROP 35 - 50 ft/hr with 3k DWOB. Frequent pickups, differential sticking. At 11350' pump 10 bbls lo / hi vis
sweeps Short wiper from 11430'. Up wt 55k. Clean pass up and down. Pump 10 bbls lo / hi vis sweeps around at 11430'. Drill from 11430' -11511. MW 8.66 / 8.85
ppg In / Out. 2.81 / 2.01 bpm @ 4300 psi free spin. ECD 9.65# at window with open choke. At 11500' pump 10 bbls lo / hi vis sweeps.
3/28/2022 Drill 4.25" lateral from 11511' MD to 11628' MD. Free spin: 4213 psi, 2.88 bpm. Rate: 2.98 bpm in, 2.11 bpm out. Circ pressure: 4213 – 4407 psi. Mud weight:
8.68 ppg in, 8.85 ppg out, ECD: 9.65 ppg. ROP: 35-60 fph, WOB: 2.3- 2.5 KLBS Drill 4.25" lateral from 11628' MD - 11730'. Free spin: 4265 psi, 2.95 bpm. Rate:
2.95 bpm in, 2.18 bpm out. Circ pressure: 4265 – 4407 psi. Mud weight: 8.69 ppg in, 8.86 ppg out, ECD: 9.68ppg. ROP: 30-40 fph, WOB: 2.3- 2.5 KLBS Perform
long wiper trip to window from 11730’ MD to 9200’ Md. Rate: 2.88 bpm in, 2.02 bpm out. circ pressure: 4051 psi. Mud weight: 8.66 ppg in, 8.86 ppg out, ECD:
9.64ppg. Pumped 10 bbls LoVis / 10 bbls HiVis. Pulled through window without issue. Jet up to 9100'. Jog. Open EDC. Circulate sweeps down. Jet tubing from
9100' up to 8500'. Circulate till wellbore cleans up. 70% return in cuttings with sweeps 0.3 ppg increase in out density. Log down for tie-in from 9230’ to 9249.33’
MD (SAG) with -3’ correction. Circulate till cuttings diminish. Close EDC. Rih. Run through window without issue. Rate: 1.41 bpm in, 0.88 bpm out. Mud weight:
8.65 ppg in, 8.84 ppg out, ECD: 9.50 ppg. Drill 4.25" lateral from 11732' MD to 11858'. Free spin: 4207 psi, 2.97 bpm. Rate: 2.97 bpm in, 2.25 bpm out. Circ
pressure: 4207 – 4301 psi. Mud weight: 8.67 ppg in, 8.83 ppg out, ECD: 9.74 ppg. ROP: 35-45 fph, WOB: 2.3- 2.5 KLBS. Pump 10 bbls lo / hi vis sweeps at
11790' and 11858' Pump 10 bbls lo / hi vis sweeps around at 11858'. Lose prime, pick up. Pull 100' wiper, clean pass. Drill 4.25" lateral from 11858'. 2.98 / 2.28
bpm @ 4100 psi free spin. MW 8.66 / 8.83 ppg In / Out. Drill to 11875'. Drill to 11875'. Poor ROP, POOH for bit. Dynamic loss rate on bottom is 40 - 50 bbl/hr. Start
new mud down CT. Keep as drilled TF through the shales. 2-3k drag from 10800 - 10700 otherwise clean. Jog below window, pull through is clean. Jog above
window then open EDC. Pump 10 bbls lo / hi vis. POOH pump 3.74 / 2.74 bpm @ 4000 psi until returns clean up. Test agitator at 280', good but not as strong as
before. Flow check at surface is good. Lift off injector and check CT for flat spots, nothing seen. L/D BHA #11. Put well on MP 0.3 bpm. Change out orienter, houred
out. Bit graded: 3-1-BT-N-X-I-RO-PR. M/U BHA #12.
3/29/2022 RIH with 4.25” drilling BHA #12. Rate: 1.48 bpm in, 0.85 bpm out. Circ pressure: 2053psi. Mud Weight: 8.68 ppg in, 8.82 ppg out. Log down for tie-in from 9230’ to
9261.48’ MD with +8.5’ correction. Close EDC. Run through window. Tag bottom of the window. PU and run through. Drill 4.25” lateral from 11875’ MD to 12013'
MD. Free spin: 3841 psi, 2.95 bpm. Rate: 2.95 bpm in, 2.29 bpm out. Circ pressure: 3841 – 3966 psi. Mud weight: 8.68 ppg in, 8.81 ppg out, ECD: 9.65 ppg. ROP:
45 fph WOB: 1-2.5 KLBS. Drill 4.25” lateral from 12013' MD to 12100'. Free spin: 3841 psi, 2.95 bpm. Rate: 2.95 bpm in, 2.29 bpm out. Circ pressure: 3841 –
3966 psi. Mud weight: 8.68 ppg in, 8.81 ppg out, ECD: 9.65 ppg. ROP: 45 fph WOB: 1-2.5 KLBS. Short BHA wiper. Drill 4.25” lateral from 12100' MD to 12165' to
12200'. Free spin: 3958 psi, 23.00 bpm. Rate: 2.96 bpm in, 2.36 bpm out. Circ pressure: 3835– 4072 psi. Mud weight: 8.66 ppg in, 8.86 ppg out, ECD: 9.71 ppg.
ROP: 35-45 fph WOB: 2.5-3.0 KLBS. Pump 10 bbls lo / hi vis sweeps at 12195'. TD called at 12200' have met geologic objectives. Wiper to window. Dragging at
11910', run back in. Pick up slower 20 ft/min. Keep as drilled TF through shales. At 10200' pump 10 bbls lo / hi vis sweeps. Clean pass to window. Jog below
window and pull through. Jog above window and open EDC. Open EDC, pump B/U 3.67 / 2.91 bpm @ 4000 psi. Steady stream of cuttings. Tie-in depth correct -
2.5'. Pass window with no issues. Tag at 9780', pick up and pass. Tag at 10322 shale. Tag 6x min rate and 0 rate, as drilled TF (20R) +/- 30 deg, various speeds
can't pass. Pump new mud to bit. New mud at bit, pump min rate try to pass at various running speeds and TF, finally pass at 0.4 bpm 45R. Continue wiper trip.
Tag shales at 10457', 10868'. Tag bottom at 12197' corrected drilled TD. 2nd wiper to window 20 ft/min. Keep as drilled TF through shales. Pump 2.94 / 2.22 bpm
new mud. Pull through 10322' shale nothing seen, RIH back through that shale 0.4 bpm nothing seen. Continue wiper to window. Pump 10 bbls lo / hi vis sweeps
near window. Clean pass from TD to window. Jog below window then pull through. Jog above window then open EDC. Pull wiper to surface. Pump 3.88 / 3.02 bpm
@ 4150 psi.
3/30/2022 Continue wiper to surface. Run back in to tie-in depth. Log tie in, correct depth -1', close EDC and RIH. Tag at the bottom of the window, PU and ran past. Set down
at 9397' (shale in the build), PU and ran past. Saw a few bobbles in weight after the first 2 set downs but nothing we had to PU for. Tag TD at 12,197', start liner pill
down the coil. POOH from TD laying in liner pill with beads followed by 9.6ppg KWF. Lay in 9.6ppg from 9900' while POOH to the window. Above the window open
the EDC and displace the well to 9.6 KWF. ECD's pushing fluid away, PUH to first flag depth to relieve ECD. Paint a yellow EOP flag at 8700' (8788' bit depth).
Paint a white EOP Flag at 5800' (5888' Bit depth). Tag stripper. Assess loss rate and flow check. L/D BHA #12. Bit is 3-2. Put well on MP line 0.4 bpm. Close MV
and PT swab 250 / 3500 psi, good. Nabors swap out 3" rams for VBRs while BHI removes UQC and flow sub. Put well back on MP 0.4 bpm. Get good shell test on
BOP doors. PT variable rams 250 / 3500 psi with 2-3/8" and 3-1/2". BOP test witness waived by AOGCC inspector Austin McLeod. Function test BOPs. Cut 21' of
CT to remove flat spot. Install BOT external connector. Pull test to 60k, good. PT to 6k off the well, good. M/U injector to well. PT riser break and packoffs 250 / 3500
psi, packoffs fail on high pressure. C/O packoffs and test 250 / 3500 psi, good. M/U CT to 1 jt of PH-6. M/U injector to well. Pump cable slack out 3600 psi cable is
heard moving. Pump out 299' of cable. Put well on MP 0.4 bpm. Install boot on e-line.
3/31/2022 MU Nozzle and load 7/8" drift ball into reel. Pump drift ball around and recovered. Set injector back and prep floor to MU Liner. Walk liner layout with Rig Manager,
Driller and BOT Hand Hold PJSM to MU Liner. MU Liner as per summary. Well taking ~25 bph, fill hole & pipe every 15 min Perform KWT Drill, well secured and
all hands called in from their stations in 3:23. LD Safety Joint, fill hole and continue running liner. Over torqued connection between joints 101 & 102, swap out for
joints 108 & 110 Continue M/U 3-1/2" liner. Fill well every 15 min fill pipe every 10 jts. M/U SELRT, 5 jts PH-6, drift and rattle each joint. Liner wt > 20k, close rams,
strip down over liner. Spaceout is 2.9'. Pump a liner volume at surface. No returns. RIH with liner. Pump across top 0.9 / 0.5 bpm while RIH. Line up on mud down
CT. Try rates 1 - 1.5 bpm unable to get returns. Pick up slowly from 8900' while circulating. Viscous 9.6# fluid in annulus not allowing any returns. Pump a CT +
liner volume drilling mud down CT 1.4 bpm, no returns. Close choke pump down kill line with drilling mud, pump an annulus volume to shoe 1.2 bpm / 750 psi. Line
up down the CT. Now able to circulate 1.1 / 0.24 bpm with 100 psi WHP. RIH to flag depth. Correct -4'. WT check above window is 46k. RIH. Pass window, nothing
seen. RIH 40 ft/min pump 1.05 / 0.28 bpm Continue RIH. Start working liner from 10230'. Pick up at 10550' is 50k. Stack at 10925' up wt is 63k. Run past with 0
pump. Get spacers and LVT ready. Can't pass 11290' stacking repeatedly here. Cycle pipe 10k to 85k no movement. Pump 10 bbls Kcl spacers with 20 bbls LVT.
Get liner moving again. Work liner down to 11404', unusual noise heard from injector, stop and troubleshoot. One of the posts that hold the injector to the cart has
broke a weld.
4/1/2022 Injector secured to frame with chain come along, PU, liner is moving and injector looks ok. RIH with reduced working parameters to see if we can get liner on
bottom. Stopped at 11485' PU to 80k then no movement RIH to 5k no movement. Circ out last bbl of LVT then PU to 80k and hold. Line up to pump down the
backside and allow LVT to soak while maintaining 9.6 ECD. Prep rig floor and injector for welding Fill out HWP, discuss scope of work - grinding & welding, fire
watch positions, continuous gas monitoring, fire extinguishers in place, working at heights. Notify Pad Op of welding Ops on the rig, start Rig Repair. 11:00 injector
repairs completed, RD equipment used to hold injector in place to weld. Try RIH maintaining 9.6 ECD, stacked 10k down, PU and pulled to 80k 2x with no
movement. Pulled to 100k 2x with no movement, dump WHP to 0psi, pulled free. RIH TD drive by flag was on depth, tag 2x at 12191' with 100k PU WT's, line up
down the coil and circulate PU and saw a little drag at 80k, RIH and lost 2' and tagged at 12189'. Stack out Wt and circulate, got 2' back, stack more WT and shut
down pump, got 2' more. Not making any more footage and need to get Deployment sleeve below the X-Nipple Pump a 18 bbl LVT pill to get liner on bottom.
Pumped 5 bbls of LVT out shut down and let soak. Got a little Wt back, PU to 50k and run down, no movement. PU to 80k looked looked like we were moving up at
77k, RIH no movement, pump another 5 bbls of LVT out PU to 80k with no movement, RIH and no movement, pump another 5 bbls out. PU to 85k and RIH with no
movement, pump last 3 bbls out. PU to 100k and dragging up hole RIH clean for 6' and tag at same depth. Pump 4 bbls to move pill up hole, PU and RIH tag at
same depth and calling this TD Discuss with OE and he agrees, prep to drop release ball. Load and launch 3/4" Ball to release from liner. No ball at volume, pump
15 bbls more. No ball, relaunch. Pump a reel volume. Launch again, ball goes on seat and shears out at 5200 psi. New up wt is 46k. Repeat to confirm. Swap well
to KCl. With KCl all the way around pump 2.51 / 2.2 bpm @ 1376 psi. Cement crew gets spotted and rigged up. Cement crew PT their line to 5k, good. Purge line
w/ air back to cmt unit. PJSM with Nabors and HES crew for pumping cement. Cement wet at 00:22. HES put 43.3 bbls cmt in CT. Shut down and charge pump
exhaust to HES to clear the line. Rig displaces zero out MM when cmt at shoe. On losses. With 3 bbls cmt left in CT shut down pump. Pick up and set down 14'
higher. Launch pee-wee dart. Pick up and side exhaust 3 bbls cmt + 3 bbls exhaust pill. Stack back down and launch LWP, zero In MM. Push it at 2.5 bpm returns
falling go to 2.3 / 0.9 bpm. Bump plug at 19.5 bbls (19.8 calculated). Holding pressure. Bleed off and check floats, good. Pick up slowly and pump 5 bbls at liner
top. 43.3 bbls cmt pumped 29.9 bbls. behind pipe. Pump 5 bbls at liner top. POOH. Losses about 6 bb/hr. Some heavy returns seen around 4000' divert to cuttings
box. Stop at 2400' and circ B/U. Gone from slight losses to no losses. Stop and flow check 10 min at 2260'. Static. Continue POOH. Tag stripper. Flush BOPs at a
high rate through T1, T2 out the top. Shut down and 10 min flowcheck, static. Fill well with 1 bbl. L/D PH-6 and cementing BHA.
4/2/2022 OOH, LD Liner Running Tools. Close Swab & Master Valves and PT to 3600psi, good PT. Open MV and use MPD Line to fill well with charge pump. Cut off
external CTC and install Internal CTC for Perf run. PT CTC to 5k psi, good PT, MU Nozzle BHA and jet stack. Suck out stack to swap rams. Rams swapped, line up
to displace coil to fresh water for testing BOPE, grease valves and calibrate Micro-Motions. Test Gas Alarms. Test BOPE as per PTD 250 psi low and 3500 psi high.
Witness waived by Austin McCleod. Test 1:C7, C9, C10, C11 - Pass. Test 2: B/S, R2, B2, C15 - Pass. Test 3: Annular (2-3/8), TIW1, B1, B4 - Pass. Test 4: Upper
2-3/8" Pipe / Slip, TIW2, B2, B3 - Pass. Test 5: Lower 2-3/8" Pipe / Slip, C5, C6, C8, TV2 Continue BOP test. Fill well every 30 min with 1-2 bbls. Test 6: Choke
A,, C - Pass. Drawdown Test. Test 7: C1, C4, TV1 - Pass. Test 8: 3" Pipe / Slips, C2, C3. Leaking, pull test jt and change O-rings, re-torque connections. Pass.
L/D test joint. Test packoffs, IRV and riser break, pass. Purge BOP test lines with air. Complete valve checklist. Circulate fresh water out of reel. HES perf crew
arrives, load guns and handling equipment onto rig. After circulating a reel volume open well to fill it. Get small amount gassy returns with 3.4 ppm H2S on rig
sensor at shaker. Shut well back in. M/U nozzle, stinger and DBPV. M/U injector to well. RIH pump 0.5 bpm take returns to tiger tank. Small amount of gassy fluid
back right at first then returns solid 8.41 ppg. Pump B/U from 9000'.
4/3/2022 Pumped 1.5 volumes for bottoms up kill, flow check well, good no flow. Well Plan called for a Lap Test before Perforating, with know losses (~0.2 bpm) we will
perform a low leak rate & pressure test. CMT in place at 02:30 on 4/2, at 28-hrs CMT UCA compressive at ~2300psi. IAP = 0 psi, OAP = 0 psi Low Leak Rate =
0.50 bpm at 477psi. Slowly bleed off pressure. POOH. OOH, dynamic flow check well, lost 1.4 bbls in 10 min, shut down pump. Notified State for retesting, witness
waived by State Rep Lou Laubenstein. Close the swab to test Drilling Choke and Pack Off for H2S Shut In. Test Packoff - Pass, Choke B - Pass. Submit BOPE
Usage Form and Form 10-424 to State for retest Test Choke B - Pass. PJSM to PU Perf Guns. RU to run guns and MU Perf Guns. Firing Head Timer started at
13:53 and will arm at 18:53. MU 96 joints of 1-1/4" CSHJ rattling each joint and circulate every 32 joints 32 joints ran, RU head pin and circulate. Circ 1+ volumes
and bottoms up. Continue M/U 1-1/4" CSH. Filling well every 20 min about 2-3 bbls each time. After jt #64 conduct D1 drill with Micah crew. Crews secure well and
report to stations in 3 min. AAR. Set pump trips low. Circulate B/U through head pin, 1-1/4" CSH string. Purge top drive, L/D safety jt. Continue M/U 1-1/4" CSH. Fill
2-3 bbls every 20 min. M/U DBPV, upper disconnect and 2 jts PH6. M/U swivel and injector. RIH. Up wt at liner top is 37k. Pass liner top slowly, nothing seen.
Continue RIH. Losing RIH wt at 11258, pickup is clean 49k. Continue RIH do periodic pickups. Wt at 11500' is 47k clean. Wt at 11800' is 52k clean. Add Lube 776
to the active system. Up wt at 11990 is 57k. Up wt at 12080 is 61k. Tag PBTD at 12178' correct to tally PBTD of 12180.67' Up wt 57k. Pump across top keep 200
psi WHP. Start movement sequence to activate firing head. Get on shot depth and get up wt back. Pick up to 50k to allow some upward BHA movement during
recoil. Good shot indication from loss of returns and WHP. POOH. Line up to pump down the CT keep 200 psi WHP while inside the liner.
4/4/2022 PERFORATED INTERVALS: 11835' - 11895'. 12140' - 12180'. 20 min Flow check at liner top is good. Continue POOH from Perf run. Tag up at surface, shut down
pump to allow perf gun gas to exhaust from guns. RIH below bottom shot and POOH circulating returns out to the Tiger Tank OOH, flow check well, good no flow,
well taking ~10 bph. Remove injector and LD 3400' of Perf guns and CSH Gun gas is pushing fluid out of the work string after we fill the hole each time. PU the
safety Joint and RU the head pin to circ the CO gas out of the 1-1/4" CSH and annulus out to the Tiger Tank Guns OOH, all shots fired, load out Perf Equipment.
MU Nozzle BHA to coil, stab on and RIH. LRS on location, MIRU and PT line to 4500psi. Online with LRS pumping diesel to load the coil. With 5 bbls diesel out the
nozzle POOH lay in diesel from liner top to surface. Send returns to tiger tank. Keep returns 1:1 or less with MPD choke. Tag stripper. Clean diesel returns for the
last 1000'. Service tree valves. Shut MV, bleed off 500 psi. Inflow test good. Shut SSV. Circulate remaining diesel in CT out to tiger tank. Purge CT riser with air out
to tiger tank. Lift injector off. L/D nozzle BHA. M/U injector to well, line up to reverse circulate. Circ 2800 psi / 3.7 bpm fresh water cable is heard moving. Rig up
hydraulic cutter. Cut off 206' of CT to give 1.25% slack. Install CT connector, pull test to 50k is good. Install stinger and nozzle. M/U injector to well. Pump forward
3.6 bpm / 3700 psi. Cable is heard moving. Lift injector off well. Remove stinger, test cable, good. Install BHI upper quick connect w/ no floats. Install blind and PT
plate. PT connector and UQC to 6k psi, good. Continue purge lines and CT. Complete RDMO checklists.
4/5/2022 Blow down surface lines and coil with HP Compressor. Start and complete RDMO Check List. Move Main and Pit Sub off Well. Rig released at 12:00.
ACTIVITYDATE SUMMARY
4/5/2022
T/I/O=0/0/0. Post CDR2 reco. Removed 4" slip blind from wing x riser, blind from
swab vavle, and kill line from tree companion flange. Installed tapped flange with
chemical jewelry on companion, 4" tree cap assembly, and torqued flanges to API
spec. Pressure tested against MV to 300/5000 psi. Passed. Installed tree work
platforms and installed wellhouse. ***Job Complete***
4/6/2022
***WELL S/I ON ARRIVAL*** (CTD)
ENCOUNTERED SUSPECTED ICE @ 59' SLM WHILE RIH w/ 4-1/2" X CATCHER.
BRUSH & FLUSH TBG w/ FULL BORE BRUSH & 3.60" G-RING DWN TO
DEPLOYMENT SLEEVE @ 9017' MD TO CLEAR TBG
LRS PUMPED 10 BBLS METH SPEAR FOLLOWED BY 30 BBLS HOT CRUDE FOR
BRUSH & FLUSH
SET 4-1/2" X-CATCHER IN X NIP @ 8977' MD (sn: XC-44)
PULL RK-DGLV IN ST #1 (6,902' MD) & ST #2 (4,176' MD).
SET RK-LGLV AT ST #2 (4,176' MD) & RK-OGLV AT ST #1 (6,902' MD).
PULL EMPTY 4-1/2" X-CATCHER SUB FROM 8,977' MD.
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
4/6/2022
Begin WSR 4/6/22 LRS Well Testing E-26 IL / E-02 OL, Unit Move RU Continue
WSR 4/7/22
4/6/2022
T/I/O=310/VAC/VAC TEMP= SI ( LRS UNIT 72) S/L ASSIST ** POSSIBLE
TUBING HYDRATE** PUMPED 9 BBLS 60/40, 40 BBLS 180* CRUDE DOWN TBG
WHILE S/L BRUSHED. S/L IN CONTROL OF WELL UPON DEPARTURE
FWHP'S = 300/VAC/VAC
4/7/2022
Continue WSR From 4/6/22 LRS Well Testing E-26 IL / E-02 OL RU, PT, Pop Well,
Flow Well, Continue WSR 4/8/22
4/8/2022
Continue WSR from 4/7/22 LRS Well Testing E-26 IL / E-02 OL Flow well, Continue
WSR 4/9/22
4/9/2022
Continue WSR from 4-8-22 LRS Well Testing E-26 IL / E--02 OL Continue flow and
cleanout Continue WSR 4-10-22
4/10/2022
***WELL S/I ON ARRIVAL*** (CTD)
RAN 4 1/2" X-CATCHER TO TAG DEPLOYMENT SLEEVE @ 8971'SLM & LOCATE
X NIP @ 8941'SLM (9007' MD CORRECTED)
RAN DUMMY 45KB & PTSA TO DEPLOYMENT SLEEVE @ 8971'SLM (Marks
inconclusive)
RAN 3.80" SWAGE & 3" BRUSH INTO DEPLOYMENT SLEEVE
RAN DUMMY 45KB & PTSA TO DEPLOYMENT SLEEVE (Good marks on brass
lugs & tattle tail pin sheared)
SET BAKER 45 FLOGARD LINER TOP PKR W/ CMD SLIDING SLEEVE (CLOSED)
(2.31") AND PTSA ASSEMBLY ON BTM. OAL LEFT IN HOLE = 18.31' / MIN ID =
2.31". SET IN DEPLOYMENT SLEEVE @ 9017'. (EST TOP OF ASSEMBLY @ 8995'
MD)
***CONTINUED ON 4/11/22 WSR***
4/10/2022
Continue WSR from 4-9-22 LRS Well Testing E-26 IL / E-02 OL Continue Flow, Shut
in for SL, Continue WSR 4-11-22
4/11/2022
***CONTINUED FROM 4/10/22 WSR*** (CTD)
ATTEMPT TO BLEED TUBING PRESSURE DOWN AFTER LTP SET (Unchanged
after 1 hr).
RIG DOWN & TURN WELL BACK OVER TO THE WELL TESTERS.
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
Daily Report of Well Operations
PBU E-26B
Daily Report of Well Operations
PBU E-26B
4/11/2022
Continue WSR from 4-10-22 LRS Well Testing E-26 IL / E-02 OL STBY for SL, Pop,
Flow Well, SI, STBY for SL Continue WSR on 4-12-22
4/12/2022
*** WELL S/I ON ARRIVAL***
RUN 2-7/8" GR & EQ-PRONG (dogless) (no pressure change / no definitive marks)
PULLED 2-7/8" XX- PLUG / PTSA FROM LTP @ 8,892 SLM (formation sand and
gravel mix inside plug)
***CONT ON 4/13/22 WSR***
4/12/2022
Continue WSR from 4-11-22 Little Red Services E-26 IL / E-02 OL STBY for SL,
Continue WSR 4-13-22
4/13/2022
***CONT FROM 4/12/22 WSR***
PULLED BAKER 45 FLOGARD LTP W/ NS STINGER ASSEMBLY FROM
DEPLOYMENT SLV @ 9,018' MD (APPEARS THAT LOWER SEAL ON STINGER
ASSEMBLY WAS IN DEPLOYMENT BUT UPPER SEAL ON STINGER DIDN'T
APPEAR TO BE STUNG IN) ***PICTURES OF SEAL IN PICTURE FOLDER
ONLINE***
*** JOB COMPLETE, WELL LEFT S/I ON DEPARTURE***
4/13/2022
Continue WSR from 4-12-22 LRS Well Testing E-26 IL / E-02 OL STBY for SL, Pop
Well, Flow Well, Well Test, Continue WSR on 4-14-22
4/14/2022
Continue WSR from 4-13-22 LRS Well Testing E-26 IL / E-02 OL Well test, De-
inventory, BD, RD, Unit Move End WSR
4/19/2022
T/I/O= 1800/550/350. LRS 72 Assist Slickline (CTD) Freeze protect the F/L and
PBGL from E-06. Pumped 35 bbls of crude and 2 bbls of 60/40 MeOH. Job cancelled
because of SV failure. Final T/I/O= 1800/550/350.
4/19/2022
***WELL FLOWING ON ARRIVAL*** (CTD)
DRIFT TO DEVIATION AT 9,236' SLM W/ 3-1/2" X-CATCHER.
JOB INCOMPLETE, SWAB VALVE STRIPPED OUT WHILE ATTEMPTING TO
OPEN.
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
4/20/2022
T/I/O = SI/1750/350. Barriers = MV , SSV,- WV,& LAT. Verified by performing
independent LTT (passed). Removed SV Bonnet, Gate & Seats. Inspected Seat
Pockets (passed). Installed new Seat Seals, Seats, Gate & rebuilt Bonnet. Pressure
tested SV 300/low & 4000/high (passed). RDMO ***Job Complete***
4/21/2022
***WELL S/I ON ARRIVAL*** (CTD)
SET 3 1/2" X-CATCHER SUB IN X-NIPPLE AT 9,003' SLM / 9,047' MD.
MADE TWO ATTEMPTS TO GET DOWNHOLE SAMPLE W/ 2.00" HYDROSTATIC
BAILER (No luck).
BAILER RELEASED CATCHER SUB WHEN SHEARED & CATCHER FELL TO
DEVIATION.
PULL 3-1/2" X-CATCHER FROM 9,224' SLM.
DRIFT TO DEVIATION AT 9,270' SLM W/ 2.00" x 10' DD BAILER (No sample).
CURRENTLY RUNNING READ 24 ARM CALIPER FROM 9,050'SLM.
***JOB IN PROGRESS, CONTINUED ON 4/22/22 WSR***
4/21/2022 Assist SL, Spotted equip and rigged to tanker. SL procedure changed, Leave location
4/22/2022
T/I/O= 2500/500/0. Assist Slickline. PT (300/3100 PSI). Pumped 200 bbls down
TBG to Load Pumped 30 bbls crude down TBG to assist Slickline set plugs. Job
continues next day
Daily Report of Well Operations
PBU E-26B
4/22/2022
***CONTINUED FROM 4/21/22 WSR*** (CTD)
RAN READ 24 ARM CALIPER FROM 9,050' SLM TO SURFACE (Good data).
BRUSH LTP SETTING AREA & SEAL BORE W/ 4-1/2" BRUSH, SPACER, & 3.00"
BRUSH.
THUNDERBIRD LOADED TUBING W/ 200 BBLS OF CRUDE WHILE BRUSHING.
RAN DUMMY 45KB LTP, 2-7/8" SPACER, PTSA TO 9,018' MD (TT-pins sheared -
Ring on no-go).
SET 45KB LTP, 2-7/8" BAKER CMD (Closed), NS PTSA (Oal = 16.54' - Min id =
2.31") AT 9,018' MD.
***2-7/8" XX PLUG W/ RSG INSTALLED IN PTSA PRIOR TO RUNNING
LTP***
THUNDERBIRD ATTEMPTED MIT-T TO 1200 PSI (Unable to pressure up).
SET, TEST, & PULL 2.813" LTTP FROM 8,959' SLM.
THUNDERBIRD PERFORMED SUCCESSFUL MIT-T TO 1200 PSI W/ CSV SET.
***JOB IN PROGRESS, CONTINUED FROM 4/23/22 WSR***
4/23/2022
***CONTINUED FROM 4/22/22 WSR*** (CTD)
EQUALIZE & PULL 2-7/8" XX PLUG BODY W/ RSG FROM NS PTSA AT 8,975'
SLM.
PULL BAKER 45KB LTP, BKR CMD SSD, & PTSA FROM 8,958' SLM / 9,005' MD.
JOB INCOMPLETE, WILL RETURN AFTER MAINTENANCE TO TROUBLE-
SHOOT.
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
4/23/2022
Job continued from previous day, Assist Slickline Load and test. Standby, RDMO,
released from job.
4/26/2022
***WELL S/I ON ARRIVAL*** (CTD)
RIG UP POLLARD #60 TO SET 45KB LINER TOP PACKER.
***JOB IN PROGRESS, CONTINUED ON 4/27/22 WSR***
4/26/2022
Initial T/I/O= 2600/437/0 Assist Slickline, Brush and Flush. Pumped 150 BBLs Hot
crude while Slickline brushed. Slickline set LTP, and got called off to another high
priority job.
FWHP= 600/450/0
4/26/2022 Assist SL B&F Travel to location
4/26/2022
***WELL S/I ON ARRIVAL*** (CTD)
BRUSH & FLUSH (Hot Crude) FROM SURFACE TO DEPLOYMENT SLV AT 9,018'
MD W/ 4-1/2" BRUSH, 3.50" G-RING.
BRUSH & FLUSH (Hot Crude) SEAL BORE INSIDE DEPLOYMENT SLEEVE W/
3.00" BRUSH, 2.80" G-RING.
SET 4-1/2" NS QCLL RECEPTACLE (Body lock ring installed), PTSA (Min id = 2.313"
at X-nipple) AT 9,017' MD.
EQUALIZE & PULL 2-7/8" XX PLUG BODY (Full of thick hard crude) W/ RSG FROM
8,977' SLM.
JOB INCOMPLETE, WILL RETURN TO SET LTP AND NEW PLUG AFTER RIG
JOB.
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
Daily Report of Well Operations
PBU E-26B
4/27/2022
***CONTINUED FROM 4/26/22 WSR*** (CTD)
SET 45KB LTP, 2-7/8" CMD SSD (Closed), NS QCLL IN QCLL RECEPTACLE AT
9,017' MD.
SET 2-7/8" XX PLUG IN NORTHERN SOLUTIONS PTSA AT 8,977' SLM / 9,021'
MD.
TOP OF 45KB LINER TOP PACKER ASSEMBLY AT 9,004' MD.
LRS PERFORMED SUCCESSFUL ASSURANCE TEST TO 1013 PSI.
PULLED 2-7/8" XX PLUG @ 8977' SLM (9021' MD)
FLOWED WELL FOR 3 HRS.
RAN 2.50" HYDROSTATIC BAILER TO LTP @ 8,961' SLM (fluid sample).
FLOWED WELL FOR 2 HRS.
***JOB CONTINUED ON 4/28/22 WSR***
NOTE: LTP ASSEMBLY SET IN TWO PIECES BUT WILL PULL IN ONE 18.23'
PIECE.
4/27/2022 T/I/O= Assist SL Hot OIl Treatment/ B&F
4/28/2022
***JOB CONTINUED FROM 4/27/22 WSR***(ctd).
RAN 2.50" HYDROSTATIC BAILER TO LTP @ 8,961' SLM (recovered solids & fluid).
***JOB COMPLETE, WELL FLOWING ON DEPARTURE***
WELL NAME
Date :
Shoe @ :FC @ :Top Liner @ :
Type:
Type :
Type :
Type :
Type :
XYes No
Yes X No Yes X No
X Yes No Yes No
Date :
Volume lost during displacement (bbls) : 13.40
Remarks:FIRST STAGE12197 12184 / 12194 9018
Preflush (Spacer)
1% KCl
Cement In Place At : 01:00 4/3/2022 Estimated TOC : 9,502
Method Used To Determine TOC : Calculated based on losses
3600
Casing Rotated? Reciprocated? % Returns during job : 69
Cement returns to surface? Spacer returns? Vol to Sur : 3
FCP (psi) : 2900 Pump used for disp : Rig Pump(GD) Plug Bumped? Bump press :
Volume :
Displacement :
PowerPro Density (ppg) : 8.5 Rate (bpm) : 2.5 Volume (actual / calculated) : 200
Post Flush (Spacer)
Density (ppg) : Rate (bpm) :
Tail Slurry
Volume (bbls) : Density (ppg) :
Yield : Sacks : Mixing / Pumping Rate (bpm) :
15.3
Yield : 1.24 Sacks : 196 Mixing / Pumping Rate (bpm) : 1.5 / 2.5
Density (ppg) :
Lead Slurry
Class G Volume (bbls): 43.3
Density (ppg) : 8.4 Volume pumped (bbls) : 100
PBW E-26B CEMENT REPORT
2-Apr-22 Hole Size :4.25"Casing Size :2-7/8"
Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]37.737899.9803/10/227899.989279.1103/10/229279.1112197.6703/23/22MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 245.23 0.00 -67.70 0.00 0.00 664479.00 5975544.00 70°20'22.1517"N148°39'54.8881"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0037.73 0.00 245.23 37.73 -29.97 0.00 0.00 664479.00 5975544.00 70°20'22.1517"N148°39'54.8881"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0099.98 0.17 245.23 99.98 32.28 -0.04 -0.08 664478.92 5975543.96 70°20'22.1513"N148°39'54.8905"W0.27 145.971 0.27 0.00 -0.06 0.22 0.22 2.30 335.23199.98 0.10 319.15 199.98 132.28 -0.03 -0.28 664478.73 5975543.96 70°20'22.1513"N148°39'54.8961"W0.17 -163.135 -0.07 73.92 -0.12 0.57 0.57 2.31 19.09299.98 0.07 180.50 299.98 232.28 -0.03 -0.33 664478.67 5975543.96 70°20'22.1514"N148°39'54.8978"W0.16 70.483 -0.03 -138.65 -0.14 0.92 0.92 2.32 174.98399.98 0.10 209.70 399.98 332.28 -0.17 -0.38 664478.63 5975543.82 70°20'22.1500"N148°39'54.8991"W0.05 -81.799 0.03 29.20 -0.28 1.27 1.27 2.34 148.76499.98 0.12 183.47 499.98 432.28 -0.35 -0.43 664478.58 5975543.64 70°20'22.1483"N148°39'54.9005"W0.05 118.355 0.02 -26.23 -0.47 1.62 1.61 2.36 137.62599.98 0.12 240.18 599.98 532.28 -0.50 -0.52 664478.49 5975543.48 70°20'22.1467"N148°39'54.9034"W0.11 -109.851 0.00 56.71 -0.65 1.97 1.96 2.39 315.10699.98 0.17 171.93 699.98 632.28 -0.70 -0.59 664478.42 5975543.28 70°20'22.1448"N148°39'54.9054"W0.17 -144.336 0.05 -68.25 -0.86 2.32 2.31 2.43 131.34799.98 0.10 125.22 799.98 732.28 -0.90 -0.50 664478.52 5975543.09 70°20'22.1428"N148°39'54.9027"W0.12 178.244 -0.07 -46.71 -1.01 2.67 2.66 2.47 122.41899.98 0.02 294.65 899.98 832.28 -0.94 -0.45 664478.57 5975543.05 70°20'22.1424"N148°39'54.9011"W0.12 -112.73 -0.08 169.43 -1.04 3.02 3.01 2.51 302.39999.98 0.10 192.55 999.98 932.28 -1.02 -0.48 664478.54 5975542.97 70°20'22.1416"N148°39'54.9021"W0.11 -109.934 0.08 -102.10 -1.12 3.36 3.36 2.56 125.801099.98 0.18 114.10 1099.98 1032.28 -1.17 -0.36 664478.67 5975542.82 70°20'22.1402"N148°39'54.8985"W0.19 158.867 0.08 -78.45 -1.22 3.71 3.71 2.61 119.001199.98 0.07 160.95 1199.98 1132.28 -1.29 -0.19 664478.84 5975542.70 70°20'22.1390"N148°39'54.8937"W0.14 -68.784 -0.11 46.85 -1.28 4.06 4.06 2.67 110.961299.98 0.22 109.42 1299.98 1232.28 -1.41 0.01 664479.04 5975542.59 70°20'22.1378"N148°39'54.8878"W0.18 137.022 0.15 -51.53 -1.33 4.41 4.41 2.73 104.211399.98 0.15 157.45 1399.98 1332.28 -1.60 0.24 664479.27 5975542.41 70°20'22.1360"N148°39'54.8811"W0.16 123.079 -0.07 48.03 -1.43 4.76 4.76 2.80 98.661499.98 0.13 175.73 1499.98 1432.28 -1.83 0.30 664479.34 5975542.17 70°20'22.1337"N148°39'54.8794"W0.05 47.411 -0.02 18.28 -1.63 5.11 5.11 2.87 96.531599.98 0.37 208.15 1599.98 1532.28 -2.23 0.15 664479.20 5975541.77 70°20'22.1297"N148°39'54.8836"W0.27 122.967 0.24 32.42 -2.06 5.46 5.45 2.94 276.441699.98 0.32 255.17 1699.97 1632.27 -2.59 -0.27 664478.79 5975541.41 70°20'22.1262"N148°39'54.8959"W0.28 -11.324 -0.05 47.02 -2.53 5.81 5.80 3.02 278.271799.98 0.42 252.45 1799.97 1732.27 -2.77 -0.89 664478.17 5975541.21 70°20'22.1245"N148°39'54.9140"W0.10 173.165 0.10 -2.72 -2.91 6.16 6.15 3.10 281.491899.98 0.05 334.15 1899.97 1832.27 -2.84 -1.26 664477.81 5975541.13 70°20'22.1238"N148°39'54.9248"W0.42 -129.59 -0.37 81.70 -3.09 6.51 6.50 3.18 283.121999.98 0.05 254.97 1999.97 1932.27 -2.81 -1.32 664477.74 5975541.16 70°20'22.1240"N148°39'54.9265"W0.06 105.765 0.00 -79.18 -3.09 6.86 6.85 3.27 287.302099.98 0.18 345.23 2099.97 2032.27 -2.67 -1.40 664477.66 5975541.30 70°20'22.1254"N148°39'54.9289"W0.19 180 0.13 90.26 -2.98 7.21 7.20 3.36 291.342199.98 0.00 322.67 2199.97 2132.27 -2.52 -1.44 664477.62 5975541.45 70°20'22.1269"N148°39'54.9301"W0.18 0 -0.18 0.00 -2.85 7.56 7.55 3.45 296.172299.98 0.15 352.50 2299.97 2232.27 -2.39 -1.46 664477.60 5975541.58 70°20'22.1282"N148°39'54.9306"W0.15 -121.257 0.15 0.00 -2.73 7.90 7.90 3.54 301.062399.98 0.13 311.77 2399.97 2332.27 -2.18 -1.56 664477.49 5975541.78 70°20'22.1302"N148°39'54.9336"W0.10 -134.56 -0.02 -40.73 -2.57 8.25 8.25 3.64 307.602499.98 0.13 222.65 2499.97 2432.27 -2.19 -1.72 664477.33 5975541.77 70°20'22.1301"N148°39'54.9383"W0.18 85.055 0.00 -89.12 -2.63 8.60 8.60 3.74 311.812599.98 0.15 248.00 2599.97 2532.27 -2.32 -1.92 664477.13 5975541.63 70°20'22.1288"N148°39'54.9441"W0.06 -167.851 0.02 25.35 -2.82 8.95 8.95 3.85 313.452699.98 0.12 95.40 2699.97 2632.27 -2.38 -1.94 664477.12 5975541.57 70°20'22.1282"N148°39'54.9446"W0.26 -68.052 -0.03 -152.60 -2.88 9.30 9.30 3.96 131.892799.98 0.38 44.38 2799.97 2732.27 -2.16 -1.60 664477.45 5975541.81 70°20'22.1305"N148°39'54.9348"W0.32 94.7 0.26 -51.02 -2.56 9.65 9.64 4.07 128.072899.98 0.38 53.78 2899.97 2832.27 -1.72 -1.10 664477.94 5975542.25 70°20'22.1347"N148°39'54.9202"W0.06 18.185 0.00 9.40 -1.99 10.00 9.99 4.18 123.152999.98 0.47 57.35 2999.96 2932.26 -1.31 -0.49 664478.54 5975542.68 70°20'22.1388"N148°39'54.9023"W0.09 -6.816 0.09 3.57 -1.39 10.34 10.34 4.29 105.193099.98 0.57 56.15 3099.96 3032.26 -0.81 0.27 664479.29 5975543.20 70°20'22.1437"N148°39'54.8801"W0.10 74.417 0.10 -1.20 -0.67 10.69 10.69 4.41 76.513199.98 0.60 64.35 3199.95 3132.25 -0.30 1.16 664480.16 5975543.72 70°20'22.1487"N148°39'54.8543"W0.09 162.995 0.03 8.20 0.09 11.04 11.04 4.53 65.783299.98 0.55 65.95 3299.95 3232.25 0.12 2.07 664481.06 5975544.16 70°20'22.1528"N148°39'54.8277"W0.05 9.406 -0.05 1.60 0.79 11.39 11.39 4.66 63.813399.98 0.62 67.02 3399.94 3332.24 0.53 3.00 664481.99 5975544.59 70°20'22.1568"N148°39'54.8003"W0.07 149.101 0.07 1.07 1.48 11.74 11.74 4.78 63.113499.98 0.60 68.17 3499.94 3432.24 0.93 3.99 664482.97 5975545.02 70°20'22.1608"N148°39'54.7716"W0.02 147.859 -0.02 1.15 2.18 12.09 12.09 4.91 62.903599.98 0.58 69.42 3599.93 3532.23 1.30 4.95 664483.92 5975545.41 70°20'22.1645"N148°39'54.7436"W0.02 -167.746 -0.02 1.25 2.85 12.44 12.44 5.04 62.843699.98 0.52 67.98 3699.93 3632.23 1.65 5.84 664484.80 5975545.78 70°20'22.1679"N148°39'54.7174"W0.06 125.986 -0.06 -1.44 3.47 12.79 12.78 5.18 62.753799.98 0.48 75.20 3799.93 3732.23 1.93 6.67 664485.62 5975546.07 70°20'22.1706"N148°39'54.6933"W0.07 123.945 -0.04 7.22 4.00 13.14 13.13 5.31 62.543899.98 0.43 86.97 3899.92 3832.22 2.06 7.45 664486.40 5975546.22 70°20'22.1719"N148°39'54.6705"W0.11 146.818 -0.05 11.77 4.38 13.49 13.48 5.45 62.633999.98 0.33 99.28 3999.92 3932.22 2.03 8.11 664487.06 5975546.21 70°20'22.1716"N148°39'54.6513"W0.13 152.345 -0.10 12.31 4.57 13.84 13.83 5.59 62.744099.98 0.23 113.38 4099.92 4032.22 1.90 8.57 664487.53 5975546.09 70°20'22.1704"N148°39'54.6376"W0.12 117.825 -0.10 14.10 4.60 14.19 14.18 5.74 62.364199.98 0.23 169.03 4199.92 4132.22 1.63 8.80 664487.76 5975545.82 70°20'22.1677"N148°39'54.6311"W0.21 28.673 0.00 55.65 4.41 14.54 14.53 5.88 241.794299.98 0.37 180.35 4299.92 4232.22 1.11 8.83 664487.81 5975545.30 70°20'22.1626"N148°39'54.6301"W0.15 49.564 0.14 11.32 3.93 14.89 14.88 6.03 241.244399.98 0.43 189.00 4399.91 4332.21 0.41 8.77 664487.76 5975544.61 70°20'22.1557"N148°39'54.6318"W0.08 -133.491 0.06 8.65 3.26 15.24 15.23 6.19 240.524499.980.38180.334499.914432.21-0.298.71664487.725975543.9070°20'22.1488"N148°39'54.6336"W0.0819.947-0.05-8.672.5715.5915.586.34239.77BH CoilTrak (2019) (Standard) E-26B CoilTrak MWD <9285-12197.67> E-26BOWSG Gyrocompass Gyro E-26 GCT_MS <0-9775> E-26OWSG MWD rev2 - Standard MWD <7975.98-10065> E-26APositional Uncertainty Model Log Name / CommentWellbore148°39'54.8881"W148°19'15.0420"W148°19'15.0420"WHoriz Uncert 1sd[ft]0.000.00[US ft]5975544.005930615.445930615.44Latitude70°20'22.1517"N70°12'49.7470"N70°12'49.7470"N[ft]-42447.09Grid East[US ft]664479.00708179.33708179.33Slot LocationFacility Reference PtField Reference PtLocal North[ft]46118.9019.07°not included50-029-21781-02Local East Grid North LongitudeSection AzimuthSurface Position UncertaintyAPI#NAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999311.26 EastSlotRig on E-26A (RT)Rig on E-26A (RT)mean sea level67.70 ft67.70 ft67.70 ftE 0.00 ftN 0.00 ftMagnetic North is 15.51 degrees East of True North2.00Std DevWellArchitectDB_LocalProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on E-26A (RT) To Facility Vertical DatumRig on E-26A (RT) To mean sea levelRig on E-26A (RT) to Ground Level at Slot (E-26)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase04/04/22 at 14:11 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaPrudhoe BayE-PadE-26E-26BE-26BE-26B03/23/2022E-26A at 9279.11 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3
4599.98 0.50 185.25 4599.91 4532.21 -1.06 8.67 664487.69 5975543.14 70°20'22.1413"N148°39'54.6348"W0.13 167.386 0.12 4.92 1.84 15.94 15.93 6.50 239.294699.98 0.37 189.80 4699.91 4632.21 -1.81 8.58 664487.61 5975542.38 70°20'22.1339"N148°39'54.6376"W0.13 91.115 -0.13 4.55 1.09 16.29 16.28 6.66 238.744799.98 0.37 192.03 4799.90 4732.20 -2.44 8.45 664487.50 5975541.74 70°20'22.1277"N148°39'54.6412"W0.01 -21.4 0.00 2.23 0.45 16.64 16.63 6.82 238.964899.98 0.42 189.38 4899.90 4832.20 -3.12 8.33 664487.39 5975541.06 70°20'22.1210"N148°39'54.6449"W0.05 0.625 0.05 -2.65 -0.23 16.99 16.98 6.98 239.264999.98 0.50 189.48 4999.90 4932.20 -3.91 8.19 664487.28 5975540.27 70°20'22.1132"N148°39'54.6487"W0.08 -30.824 0.08 0.10 -1.02 17.34 17.32 7.15 239.385099.98 0.58 184.87 5099.89 5032.19 -4.85 8.08 664487.18 5975539.33 70°20'22.1040"N148°39'54.6521"W0.09 -17.267 0.08 -4.61 -1.94 17.69 17.67 7.32 239.175199.98 0.80 180.03 5199.89 5132.19 -6.05 8.04 664487.17 5975538.13 70°20'22.0922"N148°39'54.6533"W0.23 -50.543 0.22 -4.84 -3.09 18.04 18.02 7.49 238.365299.98 0.87 174.72 5299.88 5232.18 -7.50 8.11 664487.27 5975536.68 70°20'22.0779"N148°39'54.6513"W0.10 -52.822 0.07 -5.31 -4.44 18.39 18.37 7.67 236.455399.98 0.90 172.27 5399.86 5332.16 -9.04 8.28 664487.48 5975535.15 70°20'22.0628"N148°39'54.6462"W0.05 -116.203 0.03 -2.45 -5.84 18.74 18.72 7.85 234.325499.98 0.82 156.08 5499.85 5432.15 -10.47 8.68 664487.90 5975533.72 70°20'22.0487"N148°39'54.6346"W0.25 -176.591 -0.08 -16.19 -7.06 19.09 19.07 8.03 232.415599.98 0.63 155.05 5599.84 5532.14 -11.62 9.20 664488.45 5975532.58 70°20'22.0374"N148°39'54.6194"W0.19 -161.198 -0.19 -1.03 -7.98 19.44 19.42 8.21 232.165699.98 0.45 147.03 5699.84 5632.14 -12.45 9.64 664488.91 5975531.77 70°20'22.0292"N148°39'54.6064"W0.19 136.78 -0.18 -8.02 -8.62 19.79 19.77 8.40 232.625799.98 0.40 154.20 5799.84 5732.14 -13.09 10.01 664489.29 5975531.13 70°20'22.0229"N148°39'54.5957"W0.07 132.857 -0.05 7.17 -9.10 20.13 20.12 8.59 233.615899.98 0.32 173.45 5899.84 5832.14 -13.69 10.19 664489.49 5975530.54 70°20'22.0171"N148°39'54.5903"W0.14 -70.815 -0.08 19.25 -9.60 20.48 20.47 8.78 234.905999.98 0.52 138.17 5999.83 5932.13 -14.30 10.53 664489.84 5975529.93 70°20'22.0110"N148°39'54.5805"W0.32 -111.213 0.20 -35.28 -10.08 20.83 20.82 8.97 55.796099.98 3.15 35.80 6099.78 6032.08 -12.41 12.44 664491.71 5975531.87 70°20'22.0296"N148°39'54.5247"W3.30 75.201 2.63 -102.37 -7.66 21.19 21.17 9.17 49.026199.98 6.35 82.42 6199.46 6131.76 -9.45 19.53 664498.73 5975534.98 70°20'22.0587"N148°39'54.3176"W4.77 12.331 3.20 46.62 -2.55 21.57 21.52 9.37 57.416299.98 10.25 87.17 6298.39 6230.69 -8.28 33.91 664513.08 5975536.47 70°20'22.0702"N148°39'53.8977"W3.96 1.861 3.90 4.75 3.25 22.03 21.88 9.56 77.956399.98 13.48 87.62 6396.24 6328.54 -7.36 54.44 664533.59 5975537.84 70°20'22.0793"N148°39'53.2978"W3.23 -5.723 3.23 0.45 10.83 22.67 22.22 9.76 84.016499.98 15.15 86.98 6493.14 6425.44 -6.18 79.14 664558.25 5975539.55 70°20'22.0908"N148°39'52.5765"W1.68 9.99 1.67 -0.64 20.01 23.54 22.55 9.96 85.736599.98 16.35 87.73 6589.38 6521.68 -4.94 106.25 664585.33 5975541.39 70°20'22.1031"N148°39'51.7845"W1.22 20.07 1.20 0.75 30.05 24.62 22.89 10.16 86.326699.98 18.20 89.88 6684.86 6617.16 -4.35 135.94 664614.99 5975542.63 70°20'22.1089"N148°39'50.9175"W1.96 38.605 1.85 2.15 40.31 25.98 23.22 10.36 87.036799.98 20.33 94.63 6779.27 6711.57 -5.72 168.87 664647.95 5975541.99 70°20'22.0954"N148°39'49.9554"W2.64 38.876 2.13 4.75 49.77 27.75 23.55 10.56 88.396899.98 22.67 99.38 6872.31 6804.61 -10.26 205.21 664684.37 5975538.24 70°20'22.0507"N148°39'48.8941"W2.91 26.795 2.34 4.75 57.35 30.10 23.88 10.77 90.576999.98 25.30 102.45 6963.67 6895.97 -18.01 245.10 664724.42 5975531.37 70°20'21.9745"N148°39'47.7290"W2.91 12.88 2.63 3.07 63.06 33.20 24.22 10.97 93.097099.98 28.55 104.00 7052.82 6985.12 -28.40 289.16 664768.69 5975521.95 70°20'21.8723"N148°39'46.4419"W3.32 10.32 3.25 1.55 67.64 37.38 24.57 11.17 95.527199.98 31.67 105.08 7139.31 7071.61 -41.02 337.71 664817.50 5975510.40 70°20'21.7482"N148°39'45.0240"W3.17 6.562 3.12 1.08 71.58 42.98 24.90 11.38 97.637299.98 35.18 105.78 7222.76 7155.06 -55.68 390.79 664870.89 5975496.90 70°20'21.6039"N148°39'43.4734"W3.53 3.533 3.51 0.70 75.06 50.33 25.22 11.58 99.417399.98 36.53 105.92 7303.81 7236.11 -71.68 447.14 664927.57 5975482.15 70°20'21.4466"N148°39'41.8277"W1.35 168.176 1.35 0.14 78.35 59.24 25.53 11.80 100.767499.98 36.08 106.08 7384.40 7316.70 -88.00 504.05 664984.83 5975467.08 70°20'21.2860"N148°39'40.1653"W0.46 163.106 -0.45 0.16 81.52 68.65 25.83 12.03 101.697599.98 35.62 106.32 7465.45 7397.75 -104.34 560.29 665041.41 5975451.98 70°20'21.1253"N148°39'38.5226"W0.48 176.928 -0.46 0.24 84.46 77.92 26.12 12.27 102.357699.98 34.77 106.40 7547.17 7479.47 -120.58 615.60 665097.05 5975436.97 70°20'20.9656"N148°39'36.9073"W0.85 160.126 -0.85 0.08 87.18 86.91 26.43 12.52 102.847799.98 34.18 106.78 7629.61 7561.91 -136.74 669.84 665151.64 5975422.00 70°20'20.8066"N148°39'35.3229"W0.63 161.727 -0.59 0.38 89.64 95.54 26.73 12.77 103.237899.98 33.43 107.23 7712.70 7645.00 -153.00 723.05 665205.18 5975406.90 70°20'20.6466"N148°39'33.7689"W0.79 158.671 -0.75 0.45 91.64 103.83 27.05 13.04 103.577975.98 32.82 107.67 7776.35 7708.65 -165.46 762.67 665245.06 5975395.32 70°20'20.5240"N148°39'32.6117"W0.86 0 -0.80 0.58 92.82 106.99 27.88 12.50 103.687995.95 34.72 107.67 7792.95 7725.25 -168.83 773.25 665255.71 5975392.19 70°20'20.4909"N148°39'32.3028"W9.51 -137.813 9.51 0.00 93.09 107.00 27.89 12.53 103.688027.75 32.64 104.09 7819.41 7751.71 -173.66 790.20 665272.76 5975387.72 70°20'20.4433"N148°39'31.8077"W9.04 -44.209 -6.54 -11.26 94.06 107.01 27.89 12.60 103.688059.62 34.15 101.52 7846.02 7778.32 -177.54 807.30 665289.94 5975384.22 70°20'20.4051"N148°39'31.3081"W6.49 -20.939 4.74 -8.06 95.98 107.02 27.90 12.66 103.688091.59 37.90 99.20 7871.88 7804.18 -180.91 825.79 665308.50 5975381.26 70°20'20.3720"N148°39'30.7680"W12.48 -17.748 11.73 -7.26 98.84 107.05 27.92 12.71 103.688123.63 42.39 97.08 7896.36 7828.66 -183.81 846.24 665329.00 5975378.81 70°20'20.3434"N148°39'30.1709"W14.65 -21.55 14.01 -6.62 102.78 107.08 27.93 12.76 103.688155.32 45.90 95.16 7919.10 7851.40 -186.15 868.18 665350.99 5975376.95 70°20'20.3204"N148°39'29.5300"W11.85 -56.123 11.08 -6.06 107.73 107.13 27.95 12.80 103.688187.50 46.79 93.37 7941.31 7873.61 -187.88 891.39 665374.24 5975375.73 70°20'20.3034"N148°39'28.8519"W4.88 -41.469 2.77 -5.56 113.68 107.19 27.97 12.85 103.678219.30 48.87 90.96 7962.66 7894.96 -188.76 914.94 665397.80 5975375.36 70°20'20.2947"N148°39'28.1641"W8.62 -133.096 6.54 -7.58 120.54 107.26 27.99 12.90 103.668251.20 47.94 89.61 7983.84 7916.14 -188.89 938.80 665421.65 5975375.77 70°20'20.2934"N148°39'27.4674"W4.30 157.998 -2.92 -4.23 128.23 107.34 28.01 12.96 103.658283.23 45.06 91.26 8005.89 7938.19 -189.05 962.02 665444.87 5975376.11 70°20'20.2918"N148°39'26.7889"W9.74 161.805 -8.99 5.15 135.66 107.43 28.03 13.03 103.638315.06 42.38 92.57 8028.89 7961.19 -189.78 984.01 665466.86 5975375.86 70°20'20.2846"N148°39'26.1468"W8.89 162.03 -8.42 4.12 142.15 107.52 28.05 13.10 103.628346.93 40.12 93.71 8052.85 7985.15 -190.93 1004.99 665487.86 5975375.18 70°20'20.2733"N148°39'25.5340"W7.47 150.768 -7.09 3.58 147.92 107.62 28.07 13.18 103.608378.92 37.42 96.22 8077.79 8010.09 -192.65 1024.94 665507.85 5975373.89 70°20'20.2563"N148°39'24.9512"W9.76 155.378 -8.44 7.85 152.81 107.71 28.09 13.26 103.598410.86 34.32 98.76 8103.67 8035.97 -195.07 1043.49 665526.45 5975371.88 70°20'20.2325"N148°39'24.4094"W10.76 147.41 -9.71 7.95 156.59 107.81 28.10 13.34 103.578442.79 31.44 102.35 8130.49 8062.79 -198.23 1060.53 665543.55 5975369.10 70°20'20.2014"N148°39'23.9118"W10.89 144.489 -9.02 11.24 159.17 107.89 28.12 13.43 103.578474.69 28.58 106.72 8158.11 8090.41 -202.20 1075.97 665559.07 5975365.46 70°20'20.1623"N148°39'23.4608"W11.28 141.477 -8.97 13.70 160.46 107.98 28.13 13.51 103.568506.68 25.53 112.57 8186.60 8118.90 -207.05 1089.67 665572.87 5975360.92 70°20'20.1146"N148°39'23.0607"W12.64 141.643 -9.53 18.29 160.35 108.05 28.14 13.60 103.568538.56 22.74 118.51 8215.70 8148.00 -212.63 1101.43 665584.75 5975355.60 70°20'20.0597"N148°39'22.7172"W11.59 131.731 -8.75 18.63 158.92 108.11 28.15 13.69 103.568569.47 20.36 126.83 8244.45 8176.75 -218.71 1110.99 665594.44 5975349.73 70°20'19.9999"N148°39'22.4380"W12.51 127.85 -7.70 26.92 156.30 108.16 28.16 13.77 103.578601.61 17.96 138.30 8274.82 8207.12 -225.76 1118.76 665602.37 5975342.85 70°20'19.9305"N148°39'22.2110"W13.86 109.115 -7.47 35.69 152.17 108.21 28.16 13.86 103.588633.94 17.03 152.21 8305.67 8237.97 -233.68 1124.29 665608.06 5975335.06 70°20'19.8527"N148°39'22.0496"W13.22 96.604 -2.88 43.03 146.50 108.24 28.17 13.94 103.598664.79 17.07 167.11 8335.17 8267.47 -242.09 1127.41 665611.37 5975326.71 70°20'19.7699"N148°39'21.9586"W14.13 87.702 0.13 48.30 139.57 108.26 28.17 14.02 103.618696.71 17.91 183.03 8365.64 8297.94 -251.56 1128.19 665612.36 5975317.26 70°20'19.6767"N148°39'21.9357"W15.17 71.162 2.63 49.87 130.87 108.27 28.18 14.10 103.628728.56 19.69 195.08 8395.80 8328.10 -261.64 1126.54 665610.92 5975307.15 70°20'19.5777"N148°39'21.9841"W13.38 51.595 5.59 37.83 120.81 108.27 28.20 14.18 283.638759.48 22.68 204.06 8424.63 8356.93 -272.12 1122.75 665607.37 5975296.59 70°20'19.4746"N148°39'22.0947"W14.25 52.685 9.67 29.04 109.67 108.27 28.21 14.25 283.648791.40 26.06 213.29 8453.71 8386.01 -283.61 1116.39 665601.26 5975284.97 70°20'19.3616"N148°39'22.2806"W15.92 64.675 10.59 28.92 96.73 108.27 28.23 14.32 283.658823.27 28.60 222.99 8482.04 8414.34 -295.04 1107.34 665592.47 5975273.34 70°20'19.2492"N148°39'22.5450"W16.06 77.232 7.97 30.44 82.96 108.27 28.26 14.39 283.658855.18 29.87 231.71 8509.90 8442.20 -305.56 1095.89 665581.25 5975262.57 70°20'19.1457"N148°39'22.8794"W13.91 55.238 3.98 27.33 69.28 108.27 28.30 14.46 283.648887.29 32.44 238.17 8537.38 8469.68 -315.06 1082.29 665567.86 5975252.78 70°20'19.0523"N148°39'23.2767"W13.12 49.536 8.00 20.12 55.86 108.29 28.33 14.53 283.638919.23 36.06 244.99 8563.79 8496.09 -323.56 1066.48 665552.25 5975243.93 70°20'18.9688"N148°39'23.7385"W16.50 38.619 11.33 21.35 42.66 108.31 28.38 14.60 283.618951.31 40.00 249.76 8589.06 8521.36 -331.12 1048.24 665534.18 5975235.97 70°20'18.8944"N148°39'24.2713"W15.31 24.299 12.28 14.87 29.55 108.35 28.43 14.66 283.588981.98 44.07 252.38 8611.83 8544.13 -337.76 1028.82 665514.90 5975228.91 70°20'18.8291"N148°39'24.8386"W14.45 34.982 13.27 8.54 16.93 108.40 28.49 14.72 283.559011.66 47.80 255.85 8632.48 8564.78 -343.58 1008.31 665494.53 5975222.64 70°20'18.7720"N148°39'25.4376"W15.11 25.27 12.57 11.69 4.73 108.47 28.55 14.78 283.519043.61 50.70 257.61 8653.33 8585.63 -349.13 984.75 665471.10 5975216.58 70°20'18.7174"N148°39'26.1257"W9.99 9.585 9.08 5.51 -8.21 108.56 28.62 14.84 283.469075.51 53.81 258.26 8672.85 8605.15 -354.40 960.09 665446.56 5975210.77 70°20'18.6656"N148°39'26.8461"W9.88 39.767 9.75 2.04 -21.24 108.67 28.70 14.90 283.419107.44 57.05 261.43 8690.97 8623.27 -359.02 934.21 665420.80 5975205.59 70°20'18.6202"N148°39'27.6018"W13.03 20.348 10.15 9.93 -34.06 108.81 28.78 14.97 283.349140.24 60.34 262.83 8708.01 8640.31 -362.85 906.46 665393.13 5975201.15 70°20'18.5826"N148°39'28.4126"W10.67 2.124 10.03 4.27 -46.75 108.98 28.87 15.04 283.279183.04 65.50 263.04 8727.49 8659.79 -367.53 868.65 665355.44 5975195.64 70°20'18.5366"N148°39'29.5168"W12.06 1.966 12.06 0.49 -63.53 109.24 29.01 15.12 283.169215.13 69.60 263.19 8739.74 8672.04 -371.08 839.21 665326.09 5975191.44 70°20'18.5017"N148°39'30.3766"W12.78 1.709 12.78 0.47 -76.51 109.46 29.12 15.19 283.069247.12 74.45 263.34 8749.61 8681.91 -374.65 809.00 665295.97 5975187.21 70°20'18.4666"N148°39'31.2590"W15.17 -19.759 15.16 0.47 -89.75 109.71 29.24 15.26 282.969279.11 79.36 261.55 8756.86 8689.16 -378.75 778.13 665265.19 5975182.44 70°20'18.4263"N148°39'32.1608"W16.29 14.932 15.35 -5.60 -103.72 109.99 29.38 15.33 282.84 Tie On Point to E-26A9285.00 80.21 261.78 8757.90 8690.20 -379.59 772.39 665259.48 5975181.47 70°20'18.4181"N148°39'32.3283"W14.93 164.466 14.43 3.90 -106.38 110.12 33.76 14.50 283.26 Top of WS9300.44 76.26 262.91 8761.05 8693.35 -381.61 757.41 665244.55 5975179.13 70°20'18.3983"N148°39'32.7658"W26.57 167.377 -25.58 7.32 -113.18 110.12 33.78 14.51 283.26 Int Az9330.65 66.52 265.28 8770.68 8702.98 -384.56 728.97 665216.18 5975175.55 70°20'18.3692"N148°39'33.5965"W33.08 166.822 -32.24 7.85 -125.27 110.12 33.81 14.57 283.24 Int Az9360.21 56.91 267.96 8784.67 8716.97 -386.12 703.02 665190.27 5975173.42 70°20'18.3539"N148°39'34.3544"W33.47 179.287 -32.51 9.07 -135.22 110.14 33.84 14.70 283.239390.33 46.38 268.14 8803.34 8735.64 -386.93 679.45 665166.73 5975172.10 70°20'18.3460"N148°39'35.0429"W34.96 -179.921 -34.96 0.60 -143.69 110.16 33.87 14.84 283.219422.89 34.15 268.11 8828.14 8760.44 -387.62 658.46 665145.76 5975170.95 70°20'18.3392"N148°39'35.6561"W37.56 174.719 -37.56 -0.09 -151.20 110.18 33.92 15.00 283.209450.74 23.59 270.54 8852.49 8784.79 -387.82 645.03 665132.34 5975170.45 70°20'18.3372"N148°39'36.0481"W38.14 -178.29 -37.92 8.73 -155.78 110.20 33.96 15.13 283.199480.55 12.31 268.97 8880.80 8813.10 -387.82 635.86 665123.17 5975170.25 70°20'18.3372"N148°39'36.3160"W37.87 101.248 -37.84 -5.27 -158.77 110.21 34.01 15.23 283.199511.17 13.72 309.33 8910.70 8843.00 -385.58 629.78 665117.04 5975172.36 70°20'18.3593"N148°39'36.4937"W29.42 87.085 4.60 131.81 -158.64 110.21 34.05 15.31 283.199540.45 16.60 341.46 8939.00 8871.30 -379.40 625.76 665112.88 5975178.45 70°20'18.4201"N148°39'36.6112"W29.89 66.777 9.84 109.73 -154.11 110.23 34.05 15.38 283.199570.0922.426.088966.988899.28-369.74625.01665111.925975188.0970°20'18.5151"N148°39'36.6331"W33.5910.19619.6483.06-145.23110.2434.0515.43283.20Page 2 of 3
9600.35 27.56 8.07 8994.40 8926.70 -357.06 626.60 665113.24 5975200.80 70°20'18.6398"N148°39'36.5865"W17.21 -26.241 16.99 6.58 -132.73 110.24 34.05 15.49 283.209630.52 36.37 0.95 9019.97 8952.27 -341.17 627.73 665114.02 5975216.71 70°20'18.7961"N148°39'36.5534"W31.72 -1.501 29.20 -23.60 -117.34 110.25 34.03 15.55 283.209660.30 46.70 0.58 9042.24 8974.54 -321.45 627.99 665113.84 5975236.42 70°20'18.9900"N148°39'36.5459"W34.70 -5.815 34.69 -1.24 -98.62 110.27 34.00 15.61 283.209690.35 56.78 359.36 9060.82 8993.12 -297.89 627.96 665113.30 5975259.98 70°20'19.2217"N148°39'36.5467"W33.69 -1.699 33.54 -4.06 -76.36 110.28 33.98 15.69 283.219723.09 67.77 359.01 9076.03 9008.33 -268.95 627.54 665112.25 5975288.90 70°20'19.5063"N148°39'36.5588"W33.58 -4.768 33.57 -1.07 -49.15 110.29 33.97 15.80 283.229752.41 79.40 358.03 9084.30 9016.60 -240.89 626.81 665110.90 5975316.94 70°20'19.7823"N148°39'36.5801"W39.79 -1.658 39.67 -3.34 -22.86 110.30 33.99 15.92 283.239780.87 91.23 357.69 9086.62 9018.92 -212.59 625.75 665109.22 5975345.20 70°20'20.0606"N148°39'36.6109"W41.58 13.332 41.57 -1.19 3.54 110.31 34.02 16.06 283.249810.57 99.62 359.70 9083.82 9016.12 -183.06 625.08 665107.90 5975374.71 70°20'20.3510"N148°39'36.6306"W29.04 138.063 28.25 6.77 31.23 110.32 34.08 16.20 283.269840.63 96.68 2.35 9079.55 9011.85 -153.31 625.61 665107.78 5975404.46 70°20'20.6436"N148°39'36.6149"W13.11 111.97 -9.78 8.82 59.51 110.32 34.16 16.28 283.289870.65 95.54 5.17 9076.36 9008.66 -123.53 627.57 665109.08 5975434.27 70°20'20.9365"N148°39'36.5577"W10.08 107.241 -3.80 9.39 88.30 110.33 34.27 16.32 283.309900.61 94.46 8.63 9073.75 9006.05 -93.91 631.15 665112.02 5975463.97 70°20'21.2278"N148°39'36.4528"W12.06 140.974 -3.60 11.55 117.47 110.33 34.40 16.35 283.329931.18 92.09 10.55 9072.00 9004.30 -63.82 636.24 665116.44 5975494.16 70°20'21.5238"N148°39'36.3043"W9.97 144.451 -7.75 6.28 147.57 110.33 34.56 16.40 283.349960.59 90.06 12.00 9071.45 9003.75 -34.98 641.99 665121.55 5975523.11 70°20'21.8074"N148°39'36.1363"W8.48 98.944 -6.90 4.93 176.70 110.33 34.73 16.45 283.369994.68 89.75 13.97 9071.50 9003.80 -1.77 649.65 665128.48 5975556.48 70°20'22.1340"N148°39'35.9125"W5.85 -90.701 -0.91 5.78 210.60 110.33 34.95 16.51 103.3710031.33 89.69 8.98 9071.68 9003.98 34.14 656.94 665134.98 5975592.54 70°20'22.4871"N148°39'35.6995"W13.62 -90.461 -0.16 -13.62 246.91 110.33 35.23 16.57 283.3910060.44 89.66 5.16 9071.85 9004.15 63.02 660.52 665137.93 5975621.49 70°20'22.7712"N148°39'35.5948"W13.12 -78.017 -0.10 -13.12 275.38 110.33 35.47 16.62 283.4110090.63 90.49 1.25 9071.81 9004.11 93.16 662.21 665138.96 5975651.65 70°20'23.0676"N148°39'35.5454"W13.24 -71.999 2.75 -12.95 304.41 110.34 35.74 16.68 283.4410120.55 91.69 357.55 9071.24 9003.54 123.07 661.89 665137.99 5975681.55 70°20'23.3617"N148°39'35.5545"W13.00 -99.367 4.01 -12.37 332.58 110.35 36.03 16.75 283.4710150.46 91.07 353.81 9070.52 9002.82 152.88 659.64 665135.08 5975711.30 70°20'23.6549"N148°39'35.6202"W12.67 -118.89 -2.07 -12.50 360.02 110.36 36.33 16.81 283.5110180.45 89.48 350.93 9070.38 9002.68 182.60 655.66 665130.45 5975740.92 70°20'23.9472"N148°39'35.7364"W10.97 -83.769 -5.30 -9.60 386.81 110.38 36.66 16.88 283.5610210.14 89.91 347.00 9070.53 9002.83 211.73 649.98 665124.13 5975769.92 70°20'24.2338"N148°39'35.9023"W13.32 -126.324 1.45 -13.24 412.48 110.40 36.99 16.95 283.6110240.27 88.00 344.40 9071.08 9003.38 240.92 642.54 665116.05 5975798.94 70°20'24.5208"N148°39'36.1195"W10.71 -167.951 -6.34 -8.63 437.64 110.42 37.33 17.03 283.6810270.01 86.13 344.00 9072.61 9004.91 269.50 634.45 665107.34 5975827.33 70°20'24.8019"N148°39'36.3556"W6.43 95.799 -6.29 -1.34 462.01 110.46 37.68 17.11 283.7510300.19 85.78 347.53 9074.74 9007.04 298.67 627.05 665099.30 5975856.33 70°20'25.0888"N148°39'36.5718"W11.72 51.391 -1.16 11.70 487.16 110.49 38.06 17.20 283.8310330.11 87.45 349.62 9076.50 9008.80 327.95 621.13 665092.75 5975885.47 70°20'25.3767"N148°39'36.7445"W8.93 31.601 5.58 6.99 512.90 110.52 38.46 17.28 283.9110360.59 91.11 351.87 9076.89 9009.19 358.02 616.23 665087.19 5975915.42 70°20'25.6725"N148°39'36.8876"W14.09 138.548 12.01 7.38 539.72 110.55 38.88 17.38 283.9910390.66 88.80 353.91 9076.91 9009.21 387.85 612.51 665082.81 5975945.17 70°20'25.9659"N148°39'36.9962"W10.25 111.251 -7.68 6.78 566.70 110.58 39.32 17.48 284.0610420.48 87.42 357.47 9077.89 9010.19 417.57 610.27 665079.92 5975974.82 70°20'26.2582"N148°39'37.0616"W12.80 -156.937 -4.63 11.94 594.05 110.61 39.78 17.57 284.1410450.05 84.80 356.35 9079.90 9012.20 447.02 608.68 665077.69 5976004.24 70°20'26.5479"N148°39'37.1079"W9.63 162.408 -8.86 -3.79 621.37 110.63 40.25 17.67 284.2110480.33 81.06 357.55 9083.62 9015.92 477.03 607.08 665075.43 5976034.19 70°20'26.8429"N148°39'37.1546"W12.96 149.705 -12.35 3.96 649.20 110.65 40.74 17.78 284.2910512.04 77.39 359.75 9089.55 9021.85 508.16 606.35 665074.01 5976065.30 70°20'27.1491"N148°39'37.1760"W13.43 -172.022 -11.57 6.94 678.39 110.68 41.26 17.90 284.3810540.64 73.69 359.21 9096.69 9028.99 535.85 606.10 665073.15 5976092.98 70°20'27.4214"N148°39'37.1833"W13.07 -145.65 -12.94 -1.89 704.47 110.70 41.73 18.02 284.4510570.32 70.06 356.56 9105.93 9038.23 564.03 605.06 665071.50 5976121.13 70°20'27.6986"N148°39'37.2134"W14.88 -161.531 -12.23 -8.93 730.77 110.72 42.22 18.14 284.5310600.53 66.36 355.21 9117.14 9049.44 592.00 603.05 665068.88 5976149.05 70°20'27.9737"N148°39'37.2720"W12.93 167.626 -12.25 -4.47 756.55 110.75 42.72 18.27 284.6110630.72 64.59 355.64 9129.67 9061.97 619.38 600.86 665066.09 5976176.37 70°20'28.2430"N148°39'37.3360"W6.00 91.533 -5.86 1.42 781.71 110.77 43.21 18.39 284.7010660.30 64.55 0.17 9142.38 9074.68 646.07 599.89 665064.53 5976203.02 70°20'28.5054"N148°39'37.3644"W13.83 7.043 -0.14 15.31 806.61 110.80 43.69 18.50 284.7910690.40 65.88 0.35 9155.00 9087.30 673.39 600.01 665064.05 5976230.34 70°20'28.7742"N148°39'37.3607"W4.45 12.635 4.42 0.60 832.48 110.82 44.20 18.61 284.8710721.82 68.37 0.95 9167.21 9099.51 702.34 600.34 665063.75 5976259.29 70°20'29.0589"N148°39'37.3510"W8.12 6.754 7.92 1.91 859.95 110.85 44.75 18.73 284.9610750.58 71.25 1.31 9177.13 9109.43 729.32 600.87 665063.69 5976286.28 70°20'29.3242"N148°39'37.3354"W10.08 22.211 10.01 1.25 885.62 110.87 45.27 18.84 285.0410783.45 74.61 2.73 9186.78 9119.08 760.72 601.98 665064.11 5976317.69 70°20'29.6330"N148°39'37.3029"W11.02 -20.597 10.22 4.32 915.66 110.90 45.89 18.98 285.1410828.40 80.24 0.59 9196.56 9128.86 804.55 603.24 665064.41 5976361.53 70°20'30.0641"N148°39'37.2659"W13.36 -3.54 12.53 -4.76 957.50 110.93 46.77 19.18 285.2810855.28 85.73 0.25 9199.85 9132.15 831.22 603.44 665064.02 5976388.20 70°20'30.3264"N148°39'37.2602"W20.46 2.942 20.42 -1.26 982.77 110.96 47.32 19.31 285.3810889.33 89.82 0.46 9201.17 9133.47 865.24 603.65 665063.48 5976422.21 70°20'30.6609"N148°39'37.2539"W12.03 73.91 12.01 0.62 1014.99 110.99 48.03 19.48 285.5010918.96 89.97 0.98 9201.22 9133.52 894.86 604.02 665063.21 5976451.83 70°20'30.9523"N148°39'37.2430"W1.83 65.7 0.51 1.75 1043.11 111.02 48.66 19.61 285.6110950.30 91.54 4.46 9200.81 9133.11 926.16 605.51 665064.01 5976483.15 70°20'31.2601"N148°39'37.1995"W12.18 -86.735 5.01 11.10 1073.17 111.04 49.33 19.75 285.7310981.95 91.72 1.26 9199.91 9132.21 957.75 607.09 665064.89 5976514.77 70°20'31.5708"N148°39'37.1533"W10.12 -118.039 0.57 -10.11 1103.55 111.07 50.02 19.88 285.8511010.15 90.67 359.29 9199.32 9131.62 985.95 607.22 665064.41 5976542.96 70°20'31.8481"N148°39'37.1493"W7.91 -120.786 -3.72 -6.99 1130.24 111.10 50.64 20.01 285.9711043.33 88.46 355.58 9199.57 9131.87 1019.08 605.74 665062.20 5976576.05 70°20'32.1740"N148°39'37.1926"W13.01 -77.622 -6.66 -11.18 1161.07 111.14 51.37 20.15 286.1211070.23 89.14 352.49 9200.14 9132.44 1045.83 602.94 665058.82 5976602.73 70°20'32.4370"N148°39'37.2741"W11.76 -104.992 2.53 -11.49 1185.43 111.19 51.96 20.28 286.2711100.13 87.73 347.20 9200.95 9133.25 1075.24 597.68 665052.91 5976632.01 70°20'32.7263"N148°39'37.4279"W18.30 -11.348 -4.72 -17.69 1211.51 111.25 52.61 20.42 286.4511130.40 91.07 346.53 9201.27 9133.57 1104.71 590.80 665045.38 5976661.33 70°20'33.0161"N148°39'37.6288"W11.25 31.68 11.03 -2.21 1237.12 111.33 53.27 20.56 286.6511160.54 94.64 348.74 9199.77 9132.07 1134.11 584.35 665038.29 5976690.57 70°20'33.3053"N148°39'37.8170"W13.93 18.358 11.84 7.33 1262.79 111.40 53.92 20.71 286.8611190.40 98.22 349.94 9196.43 9128.73 1163.26 578.86 665032.17 5976719.60 70°20'33.5920"N148°39'37.9773"W12.64 21.391 11.99 4.02 1288.55 111.47 54.57 20.86 287.0611220.28 102.58 351.69 9191.03 9123.33 1192.27 574.17 665026.84 5976748.49 70°20'33.8773"N148°39'38.1143"W15.69 32.757 14.59 5.86 1314.43 111.54 55.23 21.00 287.2711245.33 106.88 354.59 9184.66 9116.96 1216.31 571.27 665023.42 5976772.46 70°20'34.1137"N148°39'38.1990"W20.49 27.331 17.17 11.58 1336.21 111.60 55.77 21.13 287.4311268.41 109.77 356.18 9177.41 9109.71 1238.15 569.51 665021.17 5976794.25 70°20'34.3285"N148°39'38.2505"W14.13 161.446 12.52 6.89 1356.27 111.64 56.27 21.24 287.5811305.51 106.45 357.34 9165.88 9098.18 1273.35 567.52 665018.41 5976829.40 70°20'34.6747"N148°39'38.3085"W9.43 162.785 -8.95 3.13 1388.89 111.71 57.09 21.40 287.8111335.34 104.48 357.97 9157.92 9090.22 1302.07 566.34 665016.61 5976858.09 70°20'34.9572"N148°39'38.3428"W6.91 173.983 -6.60 2.11 1415.65 111.76 57.75 21.54 288.0011365.27 100.18 358.43 9151.53 9083.83 1331.29 565.43 665015.05 5976887.28 70°20'35.2445"N148°39'38.3695"W14.45 165.82 -14.37 1.54 1442.97 111.82 58.44 21.68 288.2011403.27 96.44 359.38 9146.04 9078.34 1368.88 564.71 665013.51 5976924.84 70°20'35.6142"N148°39'38.3904"W10.15 167.302 -9.84 2.50 1478.26 111.89 59.33 21.88 288.4611425.44 92.49 0.27 9144.32 9076.62 1390.97 564.64 665012.96 5976946.93 70°20'35.8315"N148°39'38.3923"W18.26 -178.039 -17.82 4.01 1499.12 111.94 59.85 22.00 288.6211459.44 88.40 0.13 9144.05 9076.35 1424.97 564.76 665012.33 5976980.91 70°20'36.1658"N148°39'38.3888"W12.04 67.572 -12.03 -0.41 1531.29 112.00 60.66 22.18 288.8611498.16 90.12 4.29 9144.55 9076.85 1463.64 566.25 665012.97 5977019.61 70°20'36.5462"N148°39'38.3451"W11.62 66.408 4.44 10.74 1568.33 112.07 61.59 22.40 289.1311530.23 91.66 7.82 9144.05 9076.35 1495.52 569.64 665015.65 5977051.55 70°20'36.8598"N148°39'38.2462"W12.01 93.078 4.80 11.01 1599.56 112.11 62.36 22.57 289.3511560.72 91.54 10.03 9143.20 9075.50 1525.63 574.36 665019.72 5977081.75 70°20'37.1559"N148°39'38.1080"W7.26 80.673 -0.39 7.25 1629.56 112.15 63.10 22.73 289.5411590.26 92.21 14.14 9142.23 9074.53 1554.50 580.54 665025.26 5977110.74 70°20'37.4397"N148°39'37.9274"W14.09 157.628 2.27 13.91 1658.86 112.17 63.80 22.89 289.7011625.32 90.12 15.00 9141.52 9073.82 1588.42 589.36 665033.33 5977144.85 70°20'37.7734"N148°39'37.6697"W6.45 63.249 -5.96 2.45 1693.80 112.19 64.63 23.08 289.8911658.53 91.48 17.70 9141.06 9073.36 1620.28 598.71 665041.98 5977176.91 70°20'38.0867"N148°39'37.3966"W9.10 -102.924 4.10 8.13 1726.97 112.20 65.41 23.26 290.0511689.83 90.49 13.40 9140.52 9072.82 1650.42 607.09 665049.70 5977207.22 70°20'38.3831"N148°39'37.1515"W14.10 -31.077 -3.16 -13.74 1758.20 112.22 66.15 23.43 290.2211718.31 92.86 11.97 9139.69 9071.99 1678.19 613.35 665055.34 5977235.12 70°20'38.6562"N148°39'36.9688"W9.72 -149.238 8.32 -5.02 1786.49 112.24 66.84 23.59 290.3911750.19 88.37 9.30 9139.35 9071.65 1709.51 619.23 665060.54 5977266.56 70°20'38.9643"N148°39'36.7969"W16.38 -157.616 -14.08 -8.38 1818.01 112.27 67.62 23.78 290.6111781.03 85.32 8.04 9141.04 9073.34 1739.95 623.87 665064.51 5977297.09 70°20'39.2636"N148°39'36.6612"W10.70 -127.925 -9.89 -4.09 1848.29 112.31 68.38 23.96 290.8411813.78 83.62 5.84 9144.20 9076.50 1772.30 627.81 665067.74 5977329.52 70°20'39.5818"N148°39'36.5460"W8.46 83.526 -5.19 -6.72 1880.16 112.37 69.18 24.15 291.1111840.39 83.72 6.72 9147.13 9079.43 1798.59 630.70 665070.05 5977355.87 70°20'39.8404"N148°39'36.4614"W3.31 84.063 0.38 3.31 1905.95 112.41 69.84 24.31 291.3411870.54 84.03 9.64 9150.35 9082.65 1828.26 634.97 665073.66 5977385.62 70°20'40.1321"N148°39'36.3367"W9.68 85.864 1.03 9.68 1935.39 112.46 70.58 24.48 291.6011900.39 84.25 12.59 9153.40 9085.70 1857.40 640.69 665078.75 5977414.87 70°20'40.4187"N148°39'36.1694"W9.86 -136.709 0.74 9.88 1964.79 112.50 71.31 24.65 291.8411930.38 83.67 12.04 9156.55 9088.85 1886.53 647.05 665084.47 5977444.14 70°20'40.7052"N148°39'35.9835"W2.66 -56.028 -1.93 -1.83 1994.41 112.54 72.04 24.83 292.0811960.57 85.05 9.99 9159.52 9091.82 1916.02 652.79 665089.56 5977473.74 70°20'40.9952"N148°39'35.8158"W8.16 -26.752 4.57 -6.79 2024.15 112.58 72.78 25.01 292.3311990.40 87.39 8.81 9161.49 9093.79 1945.38 657.65 665093.77 5977503.20 70°20'41.2840"N148°39'35.6737"W8.78 0.666 7.84 -3.96 2053.49 112.63 73.52 25.18 292.6112020.28 89.97 8.84 9162.18 9094.48 1974.90 662.23 665097.71 5977532.81 70°20'41.5743"N148°39'35.5397"W8.64 9.907 8.63 0.10 2082.88 112.68 74.26 25.36 292.9112050.34 93.23 9.41 9161.34 9093.64 2004.56 667.00 665101.82 5977562.57 70°20'41.8660"N148°39'35.4004"W11.01 -10.605 10.84 1.90 2112.48 112.74 75.01 25.54 293.2212080.18 95.94 8.90 9158.95 9091.25 2033.93 671.73 665105.91 5977592.03 70°20'42.1548"N148°39'35.2621"W9.24 3.745 9.08 -1.71 2141.77 112.79 75.75 25.72 293.5412110.00 98.81 9.09 9155.12 9087.42 2063.13 676.35 665109.89 5977621.33 70°20'42.4420"N148°39'35.1269"W9.65 -25.825 9.62 0.64 2170.89 112.85 76.49 25.90 293.8612140.67 102.36 7.33 9149.49 9081.79 2092.97 680.66 665113.54 5977651.24 70°20'42.7354"N148°39'35.0010"W12.88 0 11.57 -5.74 2200.49 112.92 77.24 26.08 294.2212197.67102.367.339137.299069.592148.19687.76665119.435977706.6170°20'43.2785"N148°39'34.7933"W0.00N/A0.000.002255.00113.0578.6226.42294.93Projected to TDPage 3 of 3
David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Hilcorp North Slope, LLC
Date: 04/29/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
WELL: PBU E-26B
PTD: 221-084
API: 50-029-21781-02-00
FINAL LWD FORMATION EVALUATION LOGS (03/21/2022 to 03/30/2022)
Multiple Propagation Resistivity & Gamma Ray
(2” & 5” MD/TVD Color Logs)
Pressure While Drilling (PWD)
Final Definitive Directional Surveys
SFTP Transfer - Data Folders:
Please include current contact information if different from above.
PTD:221-084
T36515
Kayla Junke Digitally signed by Kayla Junke
Date: 2022.04.29 13:09:44 -08'00'
PBU E-26B
From: Mark Igtanloc PTD 2210840
To: Rego, James B (OGQ; DOA AOGCC Prudhoe Bav; Brooks, Phoebe L (OGQ
Subject: CDR2 2 Week Test
Date: Tuesday, April 5, 2022 8:55:36 AM
Attachments: E-26 CDR2 BOP Test 4-2-22.xlsx
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
All,
Attached is the BOP Test Form for the 2-week test on CDR2 for E-26. We were granted a 1
day extension by Jim Regg so we could get liner on bottom and cement in place before testing.
Mark Igtanloc
Sr. Drilling Foreman — CTD
Rig (907) 670-3097
Cell (907) 268-9140
Positional Email AlaskaNS-CTD-DSM(@hilcorp.com
Alternate: John Perl
1111-lilcorp Alaska, LLC
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
*All BOPE reports are due to the agency within 5 days of testing*
Submit to: iim.regg(@alaska.gov; AOGCC.Inspectors(a�alaska.gov; phoebe.brooks(c2)alaska.gov
Owner/Contractor: Nabors Rig No.: CDR2AC DATE: 4/2/22
Rig Rep.: R.Coyne / W.Williams Rig Phone: 907-670-3056
Operator: Hilcorp Op. Phone: 907-670-3097
Rep.: M. Igtanloc / T. Kavanaugh E-Mail Alaska NS-CTD-DSM(5hilcorp.com
Well Name: PBU E-26B ✓ PTD # 2210840 ✓ Sundry #
Operation:
Test:
Test Pressure (psi):
Drilling: X
Initial:
Rams: 250/3500
Workover:
Weekly:
Annular: 250/3500
Explor.:
Bi-Weekly: X Other:
Valves: 250/3500 MASP:
238�
MISC. INSPECTIONS:
TEST DATA
FLOOR SAFETY VALVES:
Test Result
Test Result
Quantity
Test Result
Location Gen.
P Well Sign
P
Upper Kelly 0
NA
Housekeeping
P Rig
P
Lower Kelly 0
NA
PTD On Location
P Hazard Sec.
P
Ball Type 2
P
inding Order Posted
P Misc.
NA
Inside BOP 0
NA
FSV Misc 0
NA
BOP STACK:
Quantity
Size/Type
Test Result
MUD SYSTEM:
Visual
Alarm
Stripper
1
2-3/8"
P
Trip Tank
P
P
Annular Preventer
1
7 1/16" GK
P
Pit Level Indicators
P
P
#1 Rams
1
Blind/Shear
P
Flow Indicator
P
P
#2 Rams
1
2-3/8" pipe slips
P
Meth Gas Detector
P
P
#3 Rams
1
3" pipe slips
P
H2S Gas Detector
P
P
#4 Rams
1
2-3/8" pipe slips
P
MS Misc
0
NA
#5 Rams
0
NA
#6 Rams
0
NA
Quantity
Test Result
Choke Ln. Valves
1
2 1/16
P
Inside Reel valves
1
P
HCR Valves
2
2 1/16
P
Kill Line Valves
1
2 1/16
P
Check Valve
0
NA
ACCUMULATOR SYSTEM:
BOP Misc
2
2.0" Piper
P
Time/Pressure
Test Result
System Pressure (psi)
3000
P
CHOKE MANIFOLD:
Pressure After Closure (psi)
2250
P
Quantity
Test Result
200 psi Attained (sec)
19
P
No. Valves
12
P
Full Pressure Attained (sec)
54
P
Manual Chokes
1
P
Blind Switch Covers:
All stations
Yes
Hydraulic Chokes
1
P
Nitgn. Bottles # & psi (Avg.):
10 @ 1990
P
CH Misc
0
NA
ACC Misc
0
NA
Test Results
Number of Failures: 0 Test Time: 7.0 Hours
Repair or replacement of equipment will be made within 0 days.
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Remarks: Checked pit level alarms and flow sensor, test H2S and LEL alarms. On test #8 o-ring on test joint leaked, pullled test
joint and changed 0-ring, test good.
AOGCC Inspection
24 hr Notice Yes Date/Time 4-1-2022 07:12
Waived By Austin McLeod
Test Start Date/Time: 4/2/2022 16:00
(date) (time) Witness
Test Finish Date/Time: 4/2/2022 23:00
J. Regg; 4/5/2022
Form 10-424 (Revised 02/2022) 2022-0402_BOP_Nabors_CDR2AC_PBU_E-26B
PBU E-26B
From: Mark Igtanloc PTD 2210840
To: DOA AOGCC Prudhoe Bav
Cc: Monty Myers; Alaska NS - CTD DSM
Subject: CDR2 BOP Usage Form on E-26B
Date: Sunday, April 3, 2022 5:06:38 PM
Attachments: CDR2 BOPE Usage Form on E-26B 4-3-2022.docx
E-26 CDR2 BOP Test 4-3-22.xlsx
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
Mark Igtanloc
Sr. Drilling Foreman — CTD
Rig (907) 670-3097
Cell (907) 268-9140
Positional Email AlaskaNS-CTD-DSM(@hilcorp.com
Alternate: John Perl
Hilcorp Alaska, LLC
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
AOGCC BOPE USAGE REPORT FORM (Well Control event
only)
Drilling Manager Name:
Monty Myers
Drill Site Manager Name:
Mark Igtanloc
Contact Number: 907-777-8431
Contact Number: 907-670-3097
Rig Name & Well Pad or Drill Site & Well Name: Nabors CDR2 E-Pad Well 26B
Permit To Drill (PTD) Number: 221-084 ✓
Date and Time of Incident: April 3, 2022 02:00 ✓
Original Scope of Work:
Prep for Perforating
Operational Description Leading up to Well Control Event:
After testing our BOPE against the swab valve, we stabbed on the well with the injector to swap the coil from fresh
water back over to KCI. Once the coil was swapped to KCI the swab valve was opened and we started circulating
taking returns back to the pits and got a low level H2S reading at the shaker. The well was shut in with the drilling
choke and the returns were diverted to the Tiger Tank.
BOPE Used and Reason:
Drilling Choke and Packoffs ✓
We were lined up to circulate through our normal flow path to take returns to the pits through the drilling choke ✓
Current BOPE test time/date
23:00 4/2/2022
Is a BOPE re -test required after use: Yes
BOPE Retest time/date and result : 09:30 4/3/2022, Packoff and Drilling Choke passed tests ✓
Plan Forward:
MU a nozzle BHA, RIH and circulate 1.5x bottoms up volume, flow check the well. With a passing flow check, POOH to
MU Perf guns.
Additional Comments:
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
*All BOPE reports are due to the agency within 5 days of testing*
Submit to: iim.regg(@alaska.gov; AOGCC.Inspectors(a�alaska.gov; phoebe.brooks(c2)alaska.gov
Owner/Contractor:
Nabors Rig No.: CDR2AC ✓
DATE:
4/3/22 ✓
Rig Rep.:
R.Coyne / W.Williams Rig Phone: 907-670-3056
Operator:
Hilcorp Op. Phone: 907-670-3097
Rep.:
M. Igtanloc / T. Kavanaugh E-Mail AlaskaNS-CTD-DSM(ohilcorp.com
Well Name:
PBU E-26B PTD # 2210840
Sundry #
Operation:
Drilling: X ✓ Workover:
Explor.:
✓
Test:
Initial: Weekly:
Bi-Weekly:
Other: X
Test Pressure (psi):
Rams: 250/3500 17 Annular: 250/3500
Valves:
250/3500
MASP: 2388
MISC. INSPECTIONS: TEST DATA
FLOOR SAFETY VALVES:
Test Result Test Result
Quantity
Test Result
Location Gen.
P Well Sign P
Upper Kelly
0
NA
Housekeeping
P Rig P
Lower Kelly
0
NA
PTD On Location
P Hazard Sec. P
Ball Type
0
NA
Standing Order Posted
P Misc. NA
Inside BOP
0
NA
FSV Misc
0
NA
BOP STACK:
Quantity
Size/Type
Test Result
MUD SYSTEM:
Visual
Alarm
Stripper
1
2-3/8"
P ✓
Trip Tank
P
P
Annular Preventer
0
7 1/16" GK
NA
Pit Level Indicators
P
P
#1 Rams
0
Blind/Shear
NA
Flow Indicator
P
P
#2 Rams
0
2-3/8" pipe slips
NA
Meth Gas Detector
P
P
#3 Rams
0
3" pipe slips
NA
H2S Gas Detector
P
P
#4 Rams
0
2-3/8" pipe slips
NA
MS Misc
0
NA
#5 Rams
0
NA
#6 Rams
0
NA
Quantity
Test Result
Choke Ln. Valves
0
2 1/16
NA
Inside Reel valves
0
NA
HCR Valves
0
2 1/16
NA
Kill Line Valves
0
2 1/16
NA
Check Valve
0
NA
ACCUMULATOR SYSTEM:
BOP Misc
0
2.0" Piper
NA
Time/Pressure
Test Result
System Pressure (psi)
NA
CHOKE MANIFOLD:
Pressure After Closure (psi)
NA
Quantity
Test Result
200 psi Attained (sec)
NA
No. Valves
0
NA
Full Pressure Attained (sec)
NA
Manual Chokes
0
NA
Blind Switch Covers:
All stations
NA
Hydraulic Chokes
0
NA
Nitgn. Bottles # & psi (Avg.):
NA
CH Misc
0
NA
ACC Misc
0
NA
✓ Test Results
Number of Failures: 0 Test Time: 0.5 Hours
Repair or replacement of equipment will be made within 0 days.
Notify the AOGCC of repairs with written confirmation to: AOGCC.Ins
Remarks: Test pack offs and drilling choke after shutting in for low level H2s
AOGCC Inspection
24 hr Notice No Date/Time 4-3-2022 09:33
Waived By Lou Laubenstein
Test Start Date/Time: 4/3/2022 9:00
(date) (time) ✓ Witness
Test Finish Date/Time: 4/3/2022 9:30
J. Regg; 4/4/2022
Form 10-424 (Revised 02/2022) 2022-0403_BOP_Nabors_CDR2AC_test-after-use_PBU_E-26B
From: Rixse, Melvin G (OGCI
To: Trevor Hyatt
Cc: Joseph Lastufka
Subject: 20220308 1457 APPROVAL PBU E-26B - PTD: 221-084 & 211-085 (Perforate with CDR2)
Date: Tuesday, March 8, 2022 2:57:48 PM
Trevor,
Hilcorp is approved to perform extended perforating with CDR2 as per the procedure below.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse(d)alaska.g_ov).
From: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Sent: Tuesday, March 8, 2022 2:47 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Subject: PBU E-26B - PTD: 221-084 & 211-085 (Perforate with CDR2)
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
The original E-26B perforation plan was to utilize the post rig extended add perf procedure on
service coil. With that practice not being an option currently, we would like to perforate roughly 300'
on the rig after we run liner and cement.
We will perforate under PTD: 221-084 (or 211-085 if the secondary target is necessary)
See below for E-26B Perf Plan:
1. Run liner to TD and cement in place
2. Flow check to confirm wellbore fluid is overbalanced to the formation.
3. Trip out of hole and flow check. Lay down liner running / cementing BHA
4. Make up —300' of 2" perf guns, 6 SPF, 60 deg phasing.
a. Deploy guns on 1.25" CSH and Coil
b. 2-3/8" safety joint with crossovers will be available while handling perf guns and 1.25"
CSH
5. Perforate wellbore per plan and pull out of hole.
a. Ensure fluid level is at surface
b. Flow check wellbore before laying down perf guns
6. Nozzle run to freeze protect well
7. RDMO
Let me know what you think and if you need anything else from us to perform this operation with
CDR2.
Thank you for your time and consideration.
Trevor Hyatt
Hilcorp Alaska, LLC
Drilling Engineer
Trevor.Hyatt(@hiIcorp.com
Cell: 907-223-3087
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
THE STATE
Alaska Oil and Gas
ofA ASKA Conservation Commission
GOVERNOR MIKE DUNLE VY 333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Monty Myers
Drilling Manager
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400
Anchorage, AK, 99503
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-26B
Hilcorp North Slope, LLC
Permit to Drill Number: 221-084
Surface Location: 1520' FNL, 501' FEL, Sec. 06, T11N, R14E, UM
Bottomhole Location: 452' FSL, 188' FWL, Sec. 32, T12N, R14E, UM
Dear Mr. Myers:
Enclosed is the approved application for the permit to drill the above referenced well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Digitally signed by JessieL.
Jessie L.
Chmielowski
Chmielowski Date: 2021.10.1511:41:33
-oa,00,
Jessie Chmielowski
Commissioner
DATED this 15 day of October, 2021.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
RECEIVED
By Samantha Carlisle at 3:48 pm, Oct 12, 2021
1a. Type of Work:
1b. Proposed Well Class: Exploratory -Gas ❑
Service - WAG ❑ Service - Disp ❑
1c. Specify if well is proposed for:
Drill ❑ Lateral ❑
Stratigraphic Test ❑ Development - Oil 0
Service - Winj ❑ Single Zone 2
Coalbed Gas ❑ Gas Hydrates ❑
Redri110 Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑
Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket 0 Single Well
11. Well Name and Number:
Hilcorp North Slope, LLC
Bond No. 107205344
PBU E-26B
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503
MD: 12,052' TVD: 9,170'
Prudhoe Bay Field
Prudhoe Bay Oil Pool
4a. Location of Well (Governmental Section):
7. Property Designation:
Surface: 1520' FNL, 501' FEL, Sec. 06, T11 N, R14E, UM, AK
ADL 028304 & 028299
Top of Productive Horizon:
8. DNR Approval Number:
13. Approximate Spud Date:
1919' FNL, 136' FWL, Sec. 05, T11N, R14E, UM, AK
89-111
January 15 2022
9. Acres in Propertv:
14. Distance to Nearest Propertv:
Total Depth:
452' FSL, 188' FWL, Sec. 32, T12N, R14E, UM, AK
4928
8,809'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 67.7'
15. Distance to Nearest Well Open
Surface: x- 664479 y- 5975544 Zone-4
GL / BF Elevation above MSL (ft): 29.97'
to Same Pool: 137'
16. Deviated wells: Kickoff depth: 9,285 feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees
Downhole: 3,268 Surface: 2,388
18. Casing Program:
Specifications
Top - Setting Depth - Bottom
Cement Quantity, c.f. or sacks
Hole
Casing
Weight
Grade
Coupling
I Length
MD
TVD
MD
TVD
(including stage data)
4-1/4"
3-1/2"x3-1/4"
9.3#/6.6#
13Cr80
STL/TCII
3,003'
9,049'
8,657'
12,052'
9,170'
174 sx Class'G'
x2-7/8"
/6.5#
STL
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft):
Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
Casing
Length
Size
Cement Volume
MD
TVD
Conductor/Structural
80'
20"
8 cu yds Concrete
117'
117'
Surface
2,653'
13-3/8"
3723 cu ft Permafrost
2,689'
2,689'
Intermediate
7,953'
9-5/8"
1865 cu ft Class 'G'
7,987'
7,786'
Liner
1,365'
7"
230 cu ft Class'G'
7,833' - 9,198'
7,657' - 8,733'
Liner
1,018'
4-1/2"
Uncemented Slotted Liner
9,045' - 10,063'
8,654' - 8,798'
Perforation Depth MD (ft): 9,045' - 10,040'
Perforation Depth TVD (ft): 8,654' - 8,797'
Hydraulic Fracture planned? Yes ❑ No P1
20. Attachments: Property Plat ❑ BOP Sketch 0 Drilling
Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirementsFT
21. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Contact Name: Trevor Hyatt
Authorized Name: Monty Myers
Contact Email: trevor.hyatt(whilcorp.com
Authorized Title: Drilling Manager
Contact Phone: 777-8396
Digitally signed by Monty M Myers
cn rMA-sM Myers US,
Monty M
10 12 0 21
o
Authorized Signature: -RiloorpAKDriling, Te°n"°a'
9 Services - AK Drilling,
Date: . .2
ers
mmyers Icolp.com
Reason lamapprovingihistlocument Commission Use Only
Permit to Drill
API Number:
Permit Approval
See cover letter for other
Number: 221-084
50-029-21781-02-00 DLB
Date:
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
BOPE test to 3500 psi.
Samples req'd: Yes ❑ No U Mud log req'd: Yes❑ No W
Variance to 20 AAC 25.112(i) approved for alternate plug placment H2S measures: Yes [R No ❑ Directional svy req'd: Yes[ No ❑
Separate sundry required for extended length perforating Spacing
exception req'd: Yes ❑ No ® Inclination -only svy req'd: Yes❑ No El
Post initial injection MIT req'd: Yes❑ No ❑
deploying without PCE.
Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski APPROVED BY 10/15/2021
Date: 2021.10.1511:41:56-08'00'
Approved by:
COMMISSIONER THE COMMISSION Date:
Comm. dts 10/15/202 Comm. JSr Pet EngMGR140CT2021 JSr Pet GeoDLB 10/14/2021 1SrResEng DSR-10/-i 2/2'i
Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)
To: Alaska Oil & Gas Conservation Commission
From: Trevor Hyatt
Drilling Engineer
Date: October 12, 2021 Hilcorp
Re: PBU E-26B Permit to Drill (and Contingency E-26C PTD)
Approval is requested for drilling a CTD sidetrack lateral from well PBU E-26A with the
Nabors CDR2 Coiled Tubing Drilling.
Proposed plan for E-26B (and contingency E-26C) Producer:
See E-26A Sundry request for complete pre -rig details - Prior to drilling activities, screening will be conducted to
drift for whipstock, dummy mandrels and MIT -IA. E-line will then mill the XN-nipple.
A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 rig. The rig will move in, test BOPE and kill the
well. A 4-1/2" whipstock will be set with the rig and a single string 3.80" window + 10' of formation will be milled.
The well will kick off drilling in the Sag, build through the Ivishak and land in Zone 2. The lateral will continue in
Zone 1 and 2 to TD (this well is E-26B WP09). If it is determined the primary target is not sufficient to produce
from, a billet will be set and the well sidetracked to the contingency target and directional plan. This plan also drills
in Zone 1 and 2 to TD (this well is E-26C WP07). The proposed sidetrack will be completed with a 3-1/2"x3-
1/4"x2-7/8" 13Cr solid liner, cemented in place and selectively perforated post rig. This completion will completely
isolate and abandon the parent Sag slotted liner.
The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is
attached for reference.
Pre -Rig Work:
• Reference E-26A Sundry submitted in concert with this request for full details.
• General work scope of Pre -Rig work:
1. Slickline: Dummy WS drift and dummy GLMs
2. Fullbore: MIT -IA
3. E-line: Mill XN-nipple
Rig Work - (Estimated to start in January 2022):
1. MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2,388 psi
a. Give AOGCC 24hr notice prior to BOPE test
b. Test against swab and master valves (No TWC)
c. Load pits with drilling fluid
d. Open well and ensure zero pressure
2. Set 4-1/2" flow through whipstock
a. Top of whipstock set at 9,285' MD (top of window - pinch point)
b. Oriented 180' ROHS
Sundry 321-540
Mill 3.80" single string window (out of 4-1/2") plus 10' of rathole.
a. Top of window (whipstock pinch point) at 9,285' MD.
b. Mill window with straight motor
c. Hold 9.8 ppg MPD while milling window
PTD221-084
4. Drill — Build & Lateral (E-26B WP09)
a. 3" BHA with GR/RES / Bi-center Bit (4.25")
b. 32' DLS build section — 627' MD / Planned TD 9,912' MD
c. 12' DLS lateral section — 2,140' MD / Planned TD 12,052' MD
d. Contingency E-26C plan to set billet and sidetrack:
i. Set billet at 9890' MD and kick off and drill contingency plan (E-26B Cont. WP07)
ii. 25' DLS build section — 200' MD / Planned TD 10,090' MD
iii. 12' DLS lateral section — 1,703' MD / Planned TD 11,793' MD
e. Drill with a constant bottom hole pressure for entire sidetrack
f. Pressure deployment will be utilized
g. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run
h. No flow test prior to laying down drilling BHA. Assure well is dead prior to picking up liner.
5. Run and Cement Liner
a. Have 2-3/8" safety joint with TIW valve ready to be picked up while running liner
b. Run 3-1/2" x3-1/4"x2-7/8" 13Cr solid liner to TD
c. Swap well over to KCI
d. Cement Liner with 36 bbls (E-26B) or 33 bbls (E-26C) - 15.3 ppg Class G cement (TOC to TOL)*
e. Freeze protect well from —2200' MD (min)
f. RDMO
Post Rig:
1. V: Valve & tree work
2. S: Set LTP* (if necessa and set live GLVs
3. C: Post rig perforate and RPM Log
Separate sundry required for extended
* Approved alternate plug placement per 20 AAC 25.112(i) length perforating deploying without PCE.
Managed Pressure Drilling:
Managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole
pressure by using minimum 8.4 ppg drilling fluid in combination with annular friction losses and applied surface
pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying DLB
annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or
fracturing at the end of the long well bores. A MPD choke for regulating surface pressure and is independent of
the WC choke.
Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will
be accomplished utilizing 3" (bighole) & 2-3/8" (slimhole) pipe/slip rams (see attached BOP configurations). The
annular preventer will act as a secondary containment during deployment and not as a stripper.
Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements
while drilling and shale behavior. The following scenario is expected:
MPD Pressure at the Planned Window (9,285' MD - 8,758' TVD)
Pumps On
Pumps Off
A
Target BHP at Window (ppg)
4,463 psi
4,463 psi
9.8
B
Annular friction - ECD (psi/ft)
557 psi
0 psi
0.06
C
Mud Hydrostatic (ppg)
3,825 psi
3,825 psi
8.4
B+C
Mud + ECD Combined
4,383 psi
3,825 psi
(no choke pressure)
A-(B+C)
Choke Pressure Required to Maintain
80 psi
638 psi
Target BHP at window and deeper
Operation Details:
Reservoir Pressure:
• The maximum reservoir pressure is expected to be 3,268 psi at 8,800' TVD (7.2 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,388 psi.
Mud Program:
• Drilling: Minimum MW of 8.4 ppg KCL with Geovis for drilling. Managed pressure used to maintain DLB
constant BHP.
• KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF to exceed the
maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring.
• Completion: A minimum MW 8.4 ppg KWF to be used for liner deployment. Will target 9.8 ppg to match
managed pressure target.
Disposal:
• All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4.
• Fluids >1 % hydrocarbons or flammables must go to GNI.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
Fluids with PH >11 must go to GNI.
Hole Size:
• 4.25" hole for the entirety of the production hole section.
Liner Program (E-2613):
• 3-1/2", 9.3#, 13Cr solid/cemented liner: 9,049' MD — 9,270' MD (221' liner)
• 3-1/4", 6.6#, 13Cr solid/cemented liner: 9,270' MD — 9,885' MD (615' liner)
• 2-7/8", 6.5#, 13Cr solid/cemented liner: 9,885' MD — 12,052' MD (2,167' liner)
Contingency Liner Program (E-26C):
0 3-1/2", 9.3#, 13Cr solid/cemented liner: 9,049' MD — 9,270' MD (221' liner)
0 3-1/4", 6.6#, 13Cr solid/cemented liner: 9,270' MD — 9,885' MD (615' liner)
0 2-7/8", 6.5#, 13Cr solid/cemented liner: 9,885' MD — 11,793' MD (1,908' liner)
The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary
A X-over shall be made up to a 2-3/8" safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached. MPD and pressure deployment is planned.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
• 1.5 wellbore volumes of KWF will be on location at all times during drilling operations.
• An X-over shall be made up to a 2-3/8" safety joint including a TO valve for all tubulars ran in hole.
• Exemption request to 20 AAC 25.036 - Liner rams in the BOPE. A 2-3/8" safety joint will be utilized while
running 2-7/8", 3-1/4", 3-1/2" solid or slotted liner. The desire is to keep the same standing orders for the
entire liner run and not change shut in techniques from well to well (run safety joint with pre -installed TIW
valve). When closing on a 2-3/8" safety joint, 2 sets of pipe/slip rams will be available, above and below
the flow cross providing better well control option.
Directional:
• Directional plan attached: Primary Plan - WP09 (E-26B) and Contingency Plan - WP07 (E-25C)
• Maximum planned hole angle is 100°. Inclination at kick off point is 800.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property line — 8,809' (E-26B) and 10,665' (E-26C)
• Distance to nearest well within pool — 137' (E-26B) and 111' (E-26C)
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
• Real time bore pressure to aid in MPD and ECD management.
Perforating:
• --300' perforated post rig (See future extended perforating sundry request)
Anti -Collision Failures:
• No failures for E-26B WP09 (E-26B)
• No failures for E-26C Cont. WP07 (E-25C)
Hazards:
• PBU E-pad is an H2S pad. The highest recorded 112S well on the pad was from E-102 (130 ppm) in 2009.
Last recorded 112S on E-26A was 12 ppm in 2018
Five fault crossings expected.
Medium lost circulation risk.
Trevor Hyatt CC: Well File
Drilling Engineer Joseph Lastufka
907-223-3087
4-1 /16" CIW
WIiLHEAU =
ACTUATOR =
KB. ELEV =
BF. REV =
KOP =
Max Angle =
Datum MD =
Datum TVD =
MaEVOY
BAKER
67.7'
31.12'
6294'
94 @ 9852'
NIA
88W SS
E-26A
13-3/8" CSG, 72#, L-80, ID = 12.347" 2689'
Minimum ID = 2.616" @ 10040'
4-1/21' TIW PACKOFF BUSHING
TOP OF 7" LNR H 7833'
PERFORATION SUMMARY
REF LOG- SPERRY SUN MWD ON 09/16/97
ANGLE AT TOP PERF: 67 @ 9198'
Note: Refer to Production DB for historical pert data
SIZE SPF
INTERVAL
Opn/Sgz
DATE
SLTD
9045 -10040
C
09/17/97
TOP OF WHIPSTOCK 7986' -
¢SV 8016'
9-5/8" CSG, 47#, L-80, ID = 8.681 " 904W -
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.953"
SAFETY NOTES: WELL ANGLE > 70` @ 9215' ***
COMPOSTIE WRAP REPAIR SH LEAK - DO NOT
MIT-OA OVER 1200 PSI DUE TO DESIGNED
PRESSURE RATING OF REPAIR AND DO NOT
PUMP METH / METH BLEND INTO OA DUE TO
CHEM INCOMPATIBILITY w/ EPDXXY RESIN ***
WLEG MAY NOT BE FULLY INSERTED INTO TOP
OF 4-1/2" TIW SS HORIZ LNR PKR - POSSIBLE CTU
CONSIDERATION.
2197' 4-1/2" HES HXO SSSV LANDING NIP, ID = 3.813"
ST
MD
TYPE
VLV
LATCH
PORT
DATE
1
4176
6902
r23
CA-M C3
CA-M G
DOME
I SO
RK
RK
16
20
10/03/97
06/11/09
MLLOUT WINDOW 7987' - 8003'
8977' --j4-1/2" HES X NIP, ID = 3.813-
8987' 1--1 7" X 4-1 /2" S PKR, ID = 3.875-
9011' 1--�4-1/2" HES X NIP, ID = 3.813"
9031' 1--�4-1/2" HES XN NIP, ID= 3.725"
9044' I-14-1/2" WLEG
ELMD TT NOT LOGGED
9045' 7" X 4-1/2" TIW HORZ
PKR, ID = 3.930"
10040' 4-1/2" TIW PACKOFF
BUSHING, ID = 2.615"
9044'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9198,
4-1/2" SLTD LNR, L-80, A152 bpf, ID = 3.953" 10063'
PRUDHOE BAY UNIT
WELL: E-26A
PERMIT No:'1971410
API No: 50-029-21781-01
SEC 6, T11 N, R14E, 1520' FNL & 500' FEL
DATE
REV BY
COMMENTS
DATE
REV BY
COMMENTS
04/22188
ORIGINAL COMPLETION
02/26/11
TQ/PJC
SFTY NOTE COMPOSITE WRAP)
09/17/97
LDW
SIDETRACK COMPLETION
11/21/19
LLG/JMD
SET PXN PLUG 11/11/19
03/06/02
RN/TP
CORRECTIONS
01/17/21
JKC/MM
PULL PLUG 01/08/21
10/27/09
TTW/SV
SAFETY NOTE
10/08/21
JNL/JMD
DEPTH CORRECTION FOR TOL
09/23/10
PJC
SFTY NOTE UPDATE
Hilcorp North Slope, LLC
02/08/11
GR/JMD
PXN PLUG PULLED 06/11/09
TREE =
WELLHEAD =
McEVOY
ACTUATOR =
KB. ELEV =
67.7'
BF. ELEV =
31.12'
KOP =
6294'
Max Angle =
Datum MD =
Datum TVD =
8800' SS
PROPOSED E-26B
REV 2 T1
13-3/8" CSG, 72#, L-80, ID = 12.347" 2689'
Minimum ID = 2.377" @ 9885'
3-1 /4" X 2-7/8" XO
TOP OF 7" LNR 7846'
TOP OF WHIPSTOCK 7986'
9-5/8" CSG, 47#, L-80, ID = 8.681" 7986'
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.953" 9044'
TOP OF 3-1/2" X 3-1/4" X 2-7/8" LNR 9049'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9198'
4-1/2" WHIPSTOCK(_/_/ ) 9285'
4-1/2" SLTD LNR, L-80, .0152 bpf, ID = 3.953" 9285'
PERFORATION SUMMARY
REF LOG: SPERRY SUN MWD ON 09/16/97
ANGLE ATTOP PERF: @'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
O n/S z
DATE
3-1/4" LNR, 6.6#, 13CR-85 TC11, .0079 bpf, ID = 2.85" 9885'
PBTD —
2-7/8" LNR, _#, , 13CR-85 , _bpf, ID = 12052'
SAFETY NOTES: WELL ANGLE > 70' @
COMPOSITE WRAP REPAIR SH LEAK - DO NOT MIT-
OA OVER 1200 PSI DUE TO DESIGNED PRESSURE
RATING OF REPAIR AND DO NOT PUMP METH /
METH BLEND INTO OA DUE TO CHEM
INCOMPATIBILITY w/ EPDXY RESIN' W LEG MAY
NOT BE FULLY INSERTED INTO TOP OF 4-1/2" TIW
SS HORIZ LNR PKR - POSSIBLE CTU
CONSIDERATION. ***CHROME LNR***
219'r 4-1/2" HES HXO SSSV LANDING NIP, ID = 3.813"
GAS LIFT MANDRELS
iT MD I TVD I DEVI TYPE I VLV I LATCH I PORT DATE
2 4176 4108 0 CA-MMG DOME RK 16 10/03/97
1 6902 6806 23 CA-MMG I SO I RK 20 06/11t09
MILLOUT WINDOW (E-26A) 7987' - 8003'
8977' 1--1 4-1/2- HES X NIP, ID = 3.813"
8987' 7" X 4-1/2- S PKR, ID = 3.875"
9011' 4-1/2" HES X NIP, ID = 3.813"
9031' —14-1/2" HES XN NIP MILLED TO 3.80" (_/_! )
9044' Ij4-1/2" WLEG
ELMD TT NOT LOGGED
9045' 7" X 4-1/2" 11W HORZ PKR, ID = 3.930"
9049' 1--� 3.70" DEPLOYMENT SLEEVE, ID = 3.00"
3-1/2" X NIP, 11) = 2.813"
9270' 3-1/2" X 3-1/4" XO, ID = 2.786"
MILLOUT WINDOW ( )—'-
1 9885' 1
DATE
REV BY
COMMENTS
DATE
REV BY
COMMENTS
04/22/88
ORIGINAL COMPLETION
09/17/97
LDW
SIDETRACK COMPLETION
I I
CTD ST E-26B
12/16/19
JMD
BUILT PROPOSED
12/16/19
JMD
BUILT PROPOSED REV 1
10/02/21
TWJMD
I BUILT PROPOSED REV 2
3-1/4" X 2-7/8" XO, ID = 2.377"
PRUDHOE BAY UNIT
WELL: E-26B
PERMIT No:
API No: 50-029-21781-02
SEC 6. T11 N. R14E. 1520' FNL & 500' FEL
BP Exploration (Alaska)
Hilcorp Alaska, LLC
Prudhoe Bay
E
Plan: E-26
Plan: E-26B
Plan: E-26B wp09
Standard Proposal Report
05 October, 2021
HALLIBURTON
Sperry Drilling Services
Project:
Prudhoe Bay
Site:
E
Well:
Plan: E-26
Wellbore:
Plan: E-26B
Design:
E-26B wp09
HALLIBURTON
FrM
Bperry Drilling
Hilcorp Alaska, LLC
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Closest Approach 3D
Error Surface: Ellipsoid Separation
Warning Method: Error Ratio
Sec
MD
Inc
Azi
TVD
+N/-S
+E/-W
Dleg
TFace
VSect Target
Annotation
1
9285.00
80.21
261.78
8757.90
-379.59
772.39
0.00
0.00
-106.39
KOP : Start Dir 91/100' : 9285' MD, 8757.97VD : 180' RT TF
2
9305.00
78.41
261.78
8761.61
-382.40
752.94
9.00
180.00
-115.40
Start Dir 32°/100' : 9305' MD, 8761.61'TVD
3
9505.00
14.41
261.78
8892.47
-402.04
616.92
32.00
180.00
-178.41
4
9837.70
100.00
19.83
9082.94
-188.58
637.97
32.00
115.00
30.21
5
9912.70
92.00
357.06
9075.00
-115.34
648.73
32.00
-108.00
102.95
Start Dir 12°/100' : 9912.7' MD, 9075'TVD
6
9962.70
90.95
351.15
9073.72
-65.64
643.60
12.00
-100.00
148.24
7
10052.70
90.18
1.92
9072.83
24.05
638.16
12.00
94.00
231.25
8
10127.70
90.18
10.92
9072.59
98.51
646.55
12.00
90.00
304.35
9
10352.70
89.71
343.93
9072.82
321.21
636.53
12.00
-91.00
511.55
10
10402.70
89.71
349.93
9073.08
369.89
625.22
12.00
90.00
553.87
11
10592.70
66.91
349.93
9111.33
551.87
592.89
12.00
180.00
715.30
12
10712.70
67.67
5.52
9157.90
662.04
588.56
12.00
90.00
818.00
13
10950.84
96.25
5.52
9190.86
894.32
611.01
12.00
0.00
1044.88
14
11150.84
94.09
341.52
9172.58
1090.75
588.63
12.00
-94.00
1223.21
15
11350.84
87.32
4.56
9170.09
1287.81
564.60
12.00
106.00
1401.61
16
11450.84
83.69
16.04
9177.95
1385.72
582.37
12.00
108.00
1499.95
17
11650.84
94.41
354.53
9181.31
1583.40
600.58
12.00
-64.00
1692.73
18
11900.84
91.32
24.41
9168.53
1826.84
641.27
12.00
95.00
1936.11
19
12052.00
87.24
6.73
9170.43
1971.84
681.68
12.00
-103.00
2086.34
Total Depth : 12052' MD, 9170.43' TVD
REFERENCE INFORMATION
Co-ordinate (N/E) Reference: Well Plan: E-26, True North
Vertical (TVD) Reference: KB @ 67.70usft (ORIG KELLY BUSHING)
Measured Depth Reference: KB @ 67.70usft (ORIG KELLY BUSHING)
Calculation Method: Minimum Curvature
7700
SURVEY PROGRAM
Date: 2021-10-04T00:00:00 Validated: Yes Version:
)epth From
Depth To
Survey/Plan
Tool
99.98
7899.98
E26 Survey 1 GCT MS (E-26)
3_Gyro-CT-pre-1998_Csg
7975.98
9285.00
E-26A Survey #2 MWD (E-26A)
3_MWD
9285.00
12052.00
E-26B wp09 (Plan: E-26B)
3_MWD
9000 CASING DETAILS
7875 TVD TVDSS MD Size Name
8758.07 8690.37 9286.00 4-1/2 41/2"TOW
9170.43 9102.73 12052.00 2-7/8 2 7/8" x 4 1 /4"
8050
8500
E 8225 85 0
CD
LO
! j) 8400
CL
KOP : Start Dir 92/100' : 9285' MD, 8757.9'TVD : 180' RT TF
8575
4 1/2" TOW Start Dir 322/100' : 9305' MD, 8761.617VD
900o 9000
28750 �= Start Dir 122/100' : 9912.7' MD, 9075'TVD
~ E-26A- /
00 00 0 /
rn 0 0 /
Q1 09500
8925 /
0
o
i
9100 / 00
/ O
O
E-26B wp08 Polygon
0
9275 0
9775
E-26
700 -525 -350 -175 0 175 350 525
WELL DETAILS: Plan: E-26
Ground Level: 29.97 Longitude
+N/-S +E/-W Northing Easting Latitude g
0.00 0.00 5975544.00 664479.00 70°20' 22.1517 N 148139' 54.8881 W
Total Depth : 12052' MD, 9170.43' TVD
/
/
/
N /
l--ali
2 7/8" x 4 1/4"
E-26B wp09
700 875 1050 1225 1400 1575 1750 1925 2100 2275 2450 2625
Vertical Section at 19.070 (350 usft/in)
CASING DETAIIS
TVD TVDSS MD Size
Name
8758.07 8690.37 9286.00 4-1/2
4 1/2" TOW
9170.43 9102.73 12052.00 2-7/8
2 7/8" x 4 1/4"
Project: Prudhoe Bay
HALLIBURTON
Site: E
Well: Plan: E-26
Sperry Drilling
Wellbore: Plan: E-26B
Plan: E-26B wp09
2400
2200
2000
1800
1600
1400
1200
w
O
S 1000
0
Z 800
0
600
400
200
0
-200
-400
-600
WELL DETAILS: Plan: E-26
Ground Level: 29.97
+N/-S +EI-W
Northing Easting Latitude Longitude
0.00 0.00
5975544.00 664479.00 70° 20' 22.1517 N 1480 39' 54.8881 W
REFERENCE INFORMATION
Co-ordinate (WE) Reference: Well Plan: E-26, True North
Vedical (TVD) Reference: KB @ 67.70usft (ORIG KELLY BUSHING)
'
Measured Depth Reference: KB @ 67.70usft (ORIG KELLY BUSHING)
Calculation Method: Minimum Curvature
-ovv -ww -cw v cw ww ow ovv ivvv iwv iwvv iovv iovv wvv �wv
West( -)/East(+) (400 usft/in)
HALLIBURTON
Standard Proposal Report
Database:
NORTH US + CANADA
Company:
Hilcorp Alaska, LLC
Project:
Prudhoe Bay
Site:
E
Well:
Plan: E-26
Wellbore:
Plan: E-26B
Design:
E-26B wp09
Local Co-ordinate Reference:
Well Plan: E-26
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Prudhoe Bay, North Slope, UNITED STATES
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site
E, TR-11-14
Site Position:
Northing:
5,973,160.88usft Latitude:
70° 19' 59.1339 N
From:
Map
Easting:
662,538.97usft Longitude:
148° 40' 53.0539 W
Position Uncertainty: 0.00 usft Slot Radius:
0" Grid Convergence:
1.24 °
Well
Plan: E-26, E-26
Well Position
+N/-S
0.00 usft Northing:
5,975,544.00 usfl Latitude:
70° 20' 22.1517 N
+E/-W
0.00 usft Easting:
664,479.00 usfl Longitude:
148° 39' 54.8881 W
Position Uncertainty
0.00 usft Wellhead Elevation: 31.12 usfl Ground Level:
29.97usft
Wellbore
Plan: E-26B
Magnetics
Model Name
Sample Date
Declination Dip Angle
Field Strength
(nT)
BGGM2021
10/4/2021
15.69 80.82
57,227.47488961
Design
E-26B wp09
Audit Notes:
Version:
Phase:
PLAN Tie On Depth:
9,285.00
Vertical Section:
Depth From (TVD)
+N/-S +E/-W Direction
(usft)
(usft) (usft)
(I
37.73
0.00 0.00
19.07
101512021 2:39:28PM Page 2 COMPASS 5000.15 Build 91E
HALLI B U RTO N Standard Proposal Report
Database:
NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company:
Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project:
Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site:
E
North Reference:
True
Well:
Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore:
Plan: E-26B
Design:
E-26B wp09
Plan Sections
Measured
Vertical
TVD
Dogleg
Build
Turn
Depth
Inclination Azimuth
Depth
System
+N/-S
+E/-W
Rate
Rate
Rate
Tool Face
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(°/100usft)
(°/100usft)
(°/100usft)
(°)
9,285.00
80.21
261.78
8,757.90
8,690.20
-379.59
772.39
0.00
0.00
0.00
0.00
9,305.00
78.41
261.78
8,761.61
8,693.91
-382.40
752.94
9.00
-9.00
0.00
180.00
9,505.00
14.41
261.78
8,892.47
8,824.77
-402.04
616.92
32.00
-32.00
0.00
180.00
9,837.70
100.00
19.83
9,082.94
9,015.24
-188.58
637.97
32.00
25.73
35.48
115.00
9,912.70
92.00
357.06
9,075.00
9,007.30
-115.34
648.73
32.00
-10.67
-30.36
-108.00
9,962.70
90.95
351.15
9,073.72
9,006.02
-65.64
643.60
12.00
-2.10
-11.82
-100.00
10,052.70
90.18
1.92
9,072.83
9,005.13
24.05
638.16
12.00
-0.85
11.97
94.00
10,127.70
90.18
10.92
9,072.59
9,004.89
98.51
646.55
12.00
0.00
12.00
90.00
10,352.70
89.71
343.93
9,072.82
9,005.12
321.21
636.53
12.00
-0.21
-12.00
-91.00
10,402.70
89.71
349.93
9,073.08
9,005.38
369.89
625.22
12.00
0.00
12.00
90.00
10,592.70
66.91
349.93
9,111.33
9,043.63
551.87
592.89
12.00
-12.00
0.00
180.00
10,712.70
67.67
5.52
9,157.90
9,090.20
662.04
588.56
12.00
0.64
13.00
90.00
10,950.84
96.25
5.52
9,190.86
9,123.16
894.32
611.01
12.00
12.00
0.00
0.00
11,150.84
94.09
341.52
9,172.58
9,104.88
1,090.75
588.63
12.00
-1.08
-12.00
-94.00
11,350.84
87.32
4.56
9,170.09
9,102.39
1,287.81
564.60
12.00
-3.38
11.52
106.00
11,450.84
83.69
16.04
9,177.95
9,110.25
1,385.72
582.37
12.00
-3.63
11.48
108.00
11,650.84
94.41
354.53
9,181.31
9,113.61
1,583.40
600.58
12.00
5.36
-10.75
-64.00
11,900.84
91.32
24.41
9,168.53
9,100.83
1,826.84
641.27
12.00
-1.23
11.95
95.00
12,052.00
87.24
6.73
9,170.43
9,102.73
1,971.84
681.68
12.00
-2.70
-11.70
-103.00
101512021 2:39:28PM Page 3 COMPASS 5000.15 Build 91E
HALLI B U RTO N
Standard Proposal Report
Database: NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company: Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project: Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site: E
North Reference:
True
Well: Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore: Plan: E-26B
Design: E-26B wp09
Planned Survey
Measured
Vertical
Map
Map
Depth
Inclination Azimuth
Depth
TVDss
+N/-S
+E/-W
Northing
Easting
DLS
Vert Section
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(usft)
(usft)
-29.97
37.73
0.00
0.00
37.73
-29.97
0.00
0.00
5,975,544.00
664,479.00
0.00
0.00
99.98
0.17
245.23
99.98
32.28
-0.04
-0.08
5,975,543.96
664,478.92
0.27
-0.06
199.98
0.10
319.15
199.98
132.28
-0.03
-0.28
5,975,543.96
664,478.73
0.17
-0.12
299.98
0.07
180.50
299.98
232.28
-0.03
-0.33
5,975,543.96
664,478.67
0.16
-0.14
399.98
0.10
209.70
399.98
332.28
-0.17
-0.38
5,975,543.83
664,478.63
0.05
-0.28
499.98
0.12
183.47
499.98
432.28
-0.35
-0.43
5,975,543.64
664,478.58
0.05
-0.47
599.98
0.12
240.18
599.98
532.28
-0.50
-0.52
5,975,543.49
664,478.49
0.11
-0.65
699.98
0.17
171.93
699.98
632.28
-0.70
-0.59
5,975,543.28
664,478.42
0.17
-0.86
799.98
0.10
125.22
799.98
732.28
-0.90
-0.50
5,975,543.09
664,478.52
0.12
-1.01
899.98
0.02
294.65
899.98
832.28
-0.94
-0.45
5,975,543.05
664,478.57
0.12
-1.04
999.98
0.10
192.55
999.98
932.28
-1.02
-0.48
5,975,542.97
664,478.54
0.11
-1.12
1,099.98
0.18
114.10
1,099.98
1,032.28
-1.17
-0.36
5,975,542.82
664,478.67
0.19
-1.22
1,199.98
0.07
160.95
1,199.98
1,132.28
-1.29
-0.19
5, 975, 542.70
664,478.84
0.14
-1.28
1,299.98
0.22
109.42
1,299.98
1,232.28
-1.41
0.01
5,975,542.59
664,479.04
0.18
-1.33
1,399.98
0.15
157.45
1,399.98
1,332.28
-1.60
0.24
5,975,542.41
664,479.27
0.16
-1.43
1,499.98
0.13
175.73
1,499.98
1,432.28
-1.83
0.30
5,975,542.18
664,479.34
0.05
-1.63
1,599.98
0.37
208.15
1,599.98
1,532.28
-2.23
0.15
5,975,541.77
664,479.20
0.27
-2.06
1,699.98
0.32
255.17
1,699.97
1,632.27
-2.59
-0.27
5,975,541.41
664,478.79
0.28
-2.53
1,799.98
0.42
252.45
1,799.97
1,732.27
-2.77
-0.89
5,975,541.21
664,478.17
0.10
-2.91
1,899.98
0.05
334.15
1,899.97
1,832.27
-2.84
-1.26
5,975,541.13
664,477.81
0.42
-3.09
1,999.98
0.05
254.97
1,999.97
1,932.27
-2.81
-1.32
5,975,541.16
664,477.74
0.06
-3.09
2,099.98
0.18
345.23
2,099.97
2,032.27
-2.67
-1.40
5,975,541.30
664,477.66
0.19
-2.98
2,199.98
0.00
322.67
2,199.97
2,132.27
-2.52
-1.44
5,975,541.45
664,477.62
0.18
-2.85
2,299.98
0.15
352.50
2,299.97
2,232.27
-2.39
-1.46
5,975,541.58
664,477.60
0.15
-2.73
2,399.98
0.13
311.77
2,399.97
2,332.27
-2.18
-1.56
5,975,541.78
664,477.49
0.10
-2.57
2,499.98
0.13
222.65
2,499.97
2,432.27
-2.19
-1.72
5,975,541.77
664,477.33
0.18
-2.63
2,599.98
0.15
248.00
2,599.97
2,532.27
-2.32
-1.92
5,975,541.63
664,477.13
0.06
-2.82
2,688.98
0.09
100.11
2,688.97
2,621.27
-2.38
-1.96
5,975,541.58
664,477.10
0.26
-2.89
13 3/8"
2,699.98
0.12
95.40
2,699.97
2,632.27
-2.38
-1.94
5,975,541.58
664,477.12
0.26
-2.88
2,799.98
0.38
44.38
2,799.97
2,732.27
-2.16
-1.60
5,975,541.81
664,477.45
0.32
-2.56
2,899.98
0.38
53.78
2,899.97
2,832.27
-1.72
-1.10
5,975,542.25
664,477.94
0.06
-1.99
2,999.98
0.47
57.35
2,999.96
2,932.26
-1.31
-0.49
5,975,542.68
664,478.54
0.09
-1.39
3,099.98
0.57
56.15
3,099.96
3,032.26
-0.81
0.27
5,975,543.20
664,479.29
0.10
-0.67
3,199.98
0.60
64.35
3,199.95
3,132.25
-0.30
1.16
5,975,543.72
664,480.16
0.09
0.09
3,299.98
0.55
65.95
3,299.95
3,232.25
0.12
2.07
5,975,544.16
664,481.06
0.05
0.79
3,399.98
0.62
67.02
3,399.94
3,332.24
0.53
3.00
5,975,544.59
664,481.99
0.07
1.48
3,499.98
0.60
68.17
3,499.94
3,432.24
0.93
3.99
5,975,545.02
664,482.97
0.02
2.18
3,599.98
0.58
69.42
3,599.93
3,532.23
1.30
4.95
5,975,545.41
664,483.92
0.02
2.85
3,699.98
0.52
67.98
3,699.93
3,632.23
1.65
5.84
5,975,545.78
664,484.80
0.06
3.47
3,799.98
0.48
75.20
3,799.93
3,732.23
1.93
6.67
5,975,546.08
664,485.62
0.07
4.00
3,899.98
0.43
86.97
3,899.92
3,832.22
2.06
7.45
5,975,546.22
664,486.40
0.11
4.38
3,999.98
0.33
99.28
3,999.92
3,932.22
2.03
8.11
5,975,546.21
664,487.06
0.13
4.57
4,099.98
0.23
113.38
4,099.92
4,032.22
1.90
8.57
5,975,546.09
664,487.53
0.12
4.60
4,199.98
0.23
169.03
4,199.92
4,132.22
1.63
8.80
5,975,545.82
664,487.76
0.21
4.41
101512021 2:39:28PM Page 4 COMPASS 5000.15 Build 91 E
HALLI B U RTO N
Standard Proposal Report
Database: NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company: Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project: Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site: E
North Reference:
True
Well: Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore: Plan: E-26B
Design: E-26B wp09
Planned Survey
Measured
Vertical
Map
Map
Depth
Inclination Azimuth
Depth
TVDss
+N/-S
+E/-W
Northing
Easting
DLS
Vert Section
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(usft)
(usft)
4,232.22
4,299.98
0.37
180.35
4,299.92
4,232.22
1.11
8.83
5,975,545.30
664,487.81
0.15
3.93
4,399.98
0.43
189.00
4,399.91
4,332.21
0.41
8.77
5,975,544.61
664,487.76
0.08
3.26
4,499.98
0.38
180.33
4,499.91
4,432.21
-0.29
8.71
5,975,543.90
664,487.72
0.08
2.57
4,599.98
0.50
185.25
4,599.91
4,532.21
-1.06
8.67
5,975,543.14
664,487.69
0.13
1.84
4,699.98
0.37
189.80
4,699.91
4,632.21
-1.81
8.58
5,975,542.38
664,487.61
0.13
1.09
4,799.98
0.37
192.03
4,799.90
4,732.20
-2.44
8.45
5,975,541.74
664,487.50
0.01
0.45
4,899.98
0.42
189.38
4,899.90
4,832.20
-3.12
8.33
5,975,541.06
664,487.39
0.05
-0.23
4,999.98
0.50
189.48
4,999.90
4,932.20
-3.91
8.19
5,975,540.27
664,487.28
0.08
-1.02
5,099.98
0.58
184.87
5,099.89
5,032.19
-4.85
8.08
5,975,539.33
664,487.18
0.09
-1.94
5,199.98
0.80
180.03
5,199.89
5,132.19
-6.05
8.04
5,975,538.13
664,487.17
0.23
-3.09
5,299.98
0.87
174.72
5,299.88
5,232.18
-7.50
8.11
5,975,536.68
664,487.27
0.10
-4.44
5,399.98
0.90
172.27
5,399.86
5,332.16
-9.04
8.28
5,975,535.15
664,487.48
0.05
-5.84
5,499.98
0.82
156.08
5,499.85
5,432.15
-10.47
8.68
5,975,533.72
664,487.90
0.25
-7.06
5,599.98
0.63
155.05
5,599.84
5,532.14
-11.62
9.20
5,975,532.58
664,488.45
0.19
-7.98
5,699.98
0.45
147.03
5,699.84
5,632.14
-12.45
9.64
5,975,531.77
664,488.91
0.19
-8.62
5,799.98
0.40
154.20
5,799.84
5,732.14
-13.09
10.01
5,975,531.13
664,489.29
0.07
-9.10
5,899.98
0.32
173.45
5,899.84
5,832.14
-13.69
10.19
5,975,530.54
664,489.49
0.14
-9.60
5,999.98
0.52
138.17
5,999.83
5,932.13
-14.30
10.53
5,975,529.94
664,489.84
0.32
-10.08
6,099.98
3.15
35.80
6,099.78
6,032.08
-12.41
12.44
5,975,531.87
664,491.71
3.30
-7.66
6,199.98
6.35
82.42
6,199.46
6,131.76
-9.45
19.53
5,975,534.98
664,498.73
4.77
-2.55
6,299.98
10.25
87.17
6,298.39
6,230.69
-8.28
33.91
5,975,536.47
664,513.08
3.96
3.25
6,399.98
13.48
87.62
6,396.24
6,328.54
-7.36
54.44
5,975,537.84
664,533.59
3.23
10.83
6,499.98
15.15
86.98
6,493.14
6,425.44
-6.18
79.14
5,975,539.55
664,558.25
1.68
20.01
6,599.98
16.35
87.73
6,589.38
6,521.68
-4.94
106.25
5,975,541.39
664,585.33
1.22
30.05
6,699.98
18.20
89.88
6,684.86
6,617.16
-4.35
135.94
5,975,542.63
664,614.99
1.96
40.31
6,799.98
20.33
94.63
6,779.27
6,711.57
-5.72
168.87
5,975,541.99
664,647.95
2.64
49.77
6,899.98
22.67
99.38
6,872.31
6,804.61
-10.26
205.21
5,975,538.24
664,684.37
2.91
57.35
6,999.98
25.30
102.45
6,963.67
6,895.97
-18.01
245.10
5,975,531.37
664,724.42
2.91
63.06
7,099.98
28.55
104.00
7,052.82
6,985.12
-28.40
289.16
5,975,521.95
664,768.70
3.32
67.64
7,199.98
31.67
105.08
7,139.31
7,071.61
-41.02
337.71
5,975,510.40
664,817.50
3.17
71.58
7,299.98
35.18
105.78
7,222.76
7,155.06
-55.68
390.79
5,975,496.91
664,870.89
3.53
75.06
7,399.98
36.53
105.92
7,303.81
7,236.11
-71.68
447.14
5,975,482.15
664,927.57
1.35
78.35
7,499.98
36.08
106.08
7,384.40
7,316.70
-88.00
504.05
5,975,467.08
664,984.83
0.46
81.52
7,599.98
35.62
106.32
7,465.45
7,397.75
-104.34
560.29
5,975,451.98
665,041.41
0.48
84.45
7,699.98
34.77
106.40
7,547.17
7,479.47
-120.58
615.60
5,975,436.97
665,097.05
0.85
87.18
7,799.98
34.18
106.78
7,629.61
7,561.91
-136.74
669.84
5,975,422.00
665,151.64
0.63
89.63
7,899.98
33.43
107.23
7,712.70
7,645.00
-153.00
723.05
5,975,406.90
665,205.18
0.79
91.64
7,975.98
32.82
107.67
7,776.35
7,708.65
-165.46
762.67
5,975,395.32
665,245.06
0.86
92.81
7,987.00
33.87
107.67
7,785.56
7,717.86
-167.30
768.44
5,975,393.61
665,250.87
9.51
92.96
9 5/8"
7,995.95
34.72
107.67
7,792.95
7,725.25
-168.83
773.24
5,975,392.19
665,255.71
9.51
93.09
8,027.75
32.64
104.09
7,819.41
7,751.71
-173.66
790.19
5,975,387.72
665,272.76
9.04
94.05
8,059.62
34.15
101.52
7,846.02
7,778.32
-177.54
807.30
5,975,384.22
665,289.94
6.49
95.97
8,091.59
37.90
99.20
7,871.88
7,804.18
-180.91
825.79
5,975,381.26
665,308.50
12.48
98.84
8,123.63
42.39
97.08
7,896.36
7,828.66
-183.81
846.23
5,975,378.81
665,329.00
14.65
102.77
101512021 2:39:28PM Page 5 COMPASS 5000.15 Build 91 E
HALLIBURTON
Standard Proposal Report
Database:
NORTH US + CANADA
Company:
Hilcorp Alaska, LLC
Project:
Prudhoe Bay
Site:
E
Well:
Plan: E-26
Wellbore:
Plan: E-26B
Design:
E-26B wp09
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth
(usft) (°) (°) (usft)
8,155.32
45.90
8,187.50
46.79
8,219.30
48.87
8,251.20
47.94
8,283.23
45.06
8,315.06
42.38
8,346.93
40.12
8,378.92
37.42
8,410.86
34.32
8,442.79
31.44
8,474.69
28.58
8,506.68
25.53
8,538.56
22.74
8,569.47
20.36
8,601.61
17.96
8,633.94
17.03
8,664.79
17.07
8,696.71
17.91
8,728.56
19.69
8,759.48
22.68
8,791.40
26.06
8,823.27
28.60
8,855.18
29.87
8,887.29
32.44
8,919.23
36.06
8,951.31
40.00
8,981.98
44.07
9,011.66
47.80
9,043.61
50.70
9,075.51
53.81
9,107.44
57.05
9,140.24
60.34
9,183.04
65.50
9,198.00
67.41
7"
9,215.13
69.60
9,247.12
74.45
9,279.11
79.36
9,285.00
80.21
KOP : Start
Dir 90/100'
9,286.00
80.12
Local Co-ordinate Reference:
Well Plan: E-26
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Map
Map
TVDss +N/-S +E/-W Northing
Easting DLS Vert Section
usft (usft) (usft) (usft)
(usft) 7,851.40
95.16
7,919.10
7,851.40
-186.15
868.18
5,975,376.95
665,350.99
11.85
107.73
93.37
7,941.31
7,873.61
-187.88
891.39
5,975,375.73
665,374.24
4.88
113.68
90.96
7,962.66
7,894.96
-188.77
914.94
5,975,375.36
665,397.80
8.62
120.54
89.61
7,983.84
7,916.14
-188.89
938.79
5,975,375.77
665,421.65
4.30
128.22
91.26
8,005.89
7,938.19
-189.05
962.02
5,975,376.11
665,444.87
9.74
135.65
92.57
8,028.89
7,961.19
-189.78
984.01
5,975,375.86
665,466.86
8.89
142.14
93.71
8,052.85
7,985.15
-190.93
1,004.99
5,975,375.17
665,487.86
7.47
147.91
96.22
8,077.79
8,010.09
-192.65
1,024.94
5,975,373.89
665,507.85
9.76
152.81
98.76
8,103.67
8,035.97
-195.07
1,043.49
5,975,371.88
665,526.45
10.76
156.58
102.35
8,130.49
8,062.79
-198.23
1,060.53
5,975,369.10
665,543.55
10.89
159.17
106.72
8,158.11
8,090.41
-202.20
1,075.97
5,975,365.46
665,559.07
11.28
160.45
112.57
8,186.60
8,118.90
-207.05
1,089.67
5,975,360.92
665,572.87
12.64
160.35
118.51
8,215.70
8,148.00
-212.63
1,101.43
5,975,355.60
665,584.75
11.59
158.92
126.83
8,244.45
8,176.75
-218.71
1,110.99
5,975,349.73
665,594.44
12.51
156.29
138.30
8,274.82
8,207.12
-225.76
1,118.76
5,975,342.85
665,602.37
13.86
152.17
152.21
8,305.67
8,237.97
-233.68
1,124.29
5,975,335.06
665,608.06
13.22
146.49
167.11
8,335.17
8,267.47
-242.09
1,127.41
5,975,326.71
665,611.37
14.13
139.56
183.03
8,365.64
8,297.94
-251.56
1,128.19
5,975,317.26
665,612.36
15.17
130.86
195.08
8,395.80
8,328.10
-261.64
1,126.54
5,975,307.15
665,610.93
13.38
120.80
204.06
8,424.63
8,356.93
-272.12
1,122.75
5,975,296.59
665,607.37
14.25
109.66
213.29
8,453.71
8,386.01
-283.61
1,116.39
5,975,284.97
665,601.26
15.92
96.72
222.99
8,482.04
8,414.34
-295.04
1,107.34
5,975,273.34
665,592.47
16.06
82.95
231.71
8,509.90
8,442.20
-305.56
1,095.89
5,975,262.57
665,581.25
13.91
69.28
238.17
8,537.38
8,469.68
-315.06
1,082.29
5,975,252.78
665,567.86
13.12
55.85
244.99
8,563.79
8,496.09
-323.56
1,066.48
5,975,243.93
665,552.25
16.50
42.66
249.76
8,589.06
8,521.36
-331.12
1,048.24
5,975,235.97
665,534.18
15.31
29.55
252.38
8,611.83
8,544.13
-337.77
1,028.81
5,975,228.91
665,514.90
14.45
16.92
255.85
8,632.48
8,564.78
-343.58
1,008.31
5,975,222.64
665,494.53
15.11
4.73
257.61
8,653.33
8,585.63
-349.13
984.75
5,975,216.58
665,471.10
9.99
-8.21
258.26
8,672.85
8,605.15
-354.40
960.09
5,975,210.77
665,446.56
9.88
-21.25
261.43
8,690.97
8,623.27
-359.02
934.21
5,975,205.59
665,420.80
13.03
-34.07
262.83
8,708.01
8,640.31
-362.85
906.46
5,975,201.15
665,393.13
10.67
-46.76
263.04
8,727.49
8,659.79
-367.53
868.65
5,975,195.64
665,355.44
12.06
-63.54
263.11
8,733.47
8,665.77
-369.18
855.04
5,975,193.69
665,341.87
12.78
-69.55
263.19
8,739.74
8,672.04
-371.08
839.21
5,975,191.44
665,326.09
12.78
-76.52
263.34
8,749.61
8,681.91
-374.65
809.00
5,975,187.21
665,295.97
15.17
-89.76
261.55
8,756.86
8,689.16
-378.75
778.13
5,975,182.43
665,265.19
16.29
-103.72
261.78
8,757.90
8,690.20
-379.59
772.39
5,975,181.47
665,259.48
14.88
-106.39
: 9285' MD, 8757.9'TVD : 180° RT TF
261.78
8,758.07
8,690.37
-379.73
771.42
5,975,181.31
665,258.51
9.00
-106.84
4 1/2" TOW
9,305.00 78.41 261.78 8,761.61
Start Dir 320/100' : 9305' MD, 8761.61'TVD
9,310.00 76.81 261.78 8,762.69
8,693.91-382.40 752.94
8,694.99-383.10 748.11
5,975,178.24 665,240.10 9.00-115.40
5,975,177.43 665,235.28 32.00-117.64
101512021 2:39:28PM Page 6 COMPASS 5000.15 Build 91 E
HALLI B U RTO N
Standard Proposal Report
Database: NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company: Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project: Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site: E
North Reference:
True
Well: Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore: Plan: E-26B
Design: E-26B wp09
Planned Survey
Measured
Vertical
Map
Map
Depth
Inclination Azimuth
Depth
TVDss
+N/-S
+E/-W
Northing
Easting
DLS
Vert Section
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(usft)
(usft)
8,697.54
9,320.00
73.61
261.78
8,765.24
8,697.54
-384.48
738.54
5,975,175.84
665,225.75
32.00
-122.07
9,330.00
70.41
261.78
8,768.33
8,700.63
-385.84
729.13
5,975,174.28
665,216.37
32.00
-126.43
9,340.00
67.21
261.78
8,771.94
8,704.24
-387.17
719.90
5,975,172.74
665,207.17
32.00
-130.70
9,350.00
64.01
261.78
8,776.07
8,708.37
-388.47
710.89
5,975,171.24
665,198.19
32.00
-134.88
9,360.00
60.81
261.78
8,780.71
8,713.01
-389.74
702.12
5,975,169.78
665,189.45
32.00
-138.94
9,370.00
57.61
261.78
8,785.82
8,718.12
-390.97
693.62
5,975,168.37
665,180.98
32.00
-142.88
9,380.00
54.41
261.78
8,791.41
8,723.71
-392.15
685.41
5,975,167.01
665,172.80
32.00
-146.68
9,390.00
51.21
261.78
8,797.46
8,729.76
-393.29
677.53
5,975,165.69
665,164.95
32.00
-150.33
9,400.00
48.01
261.78
8,803.94
8,736.24
-394.38
669.99
5,975,164.44
665,157.44
32.00
-153.82
9,410.00
44.81
261.78
8,810.83
8,743.13
-395.41
662.83
5,975,163.25
665,150.29
32.00
-157.14
9,420.00
41.61
261.78
8,818.12
8,750.42
-396.39
656.05
5,975,162.12
665,143.54
32.00
-160.28
9,430.00
38.41
261.78
8,825.78
8,758.08
-397.31
649.69
5,975,161.06
665,137.20
32.00
-163.23
9,440.00
35.21
261.78
8,833.79
8,766.09
-398.17
643.76
5,975,160.08
665,131.29
32.00
-165.97
9,450.00
32.01
261.78
8,842.11
8,774.41
-398.96
638.28
5,975,159.17
665,125.84
32.00
-168.51
9,460.00
28.81
261.78
8,850.74
8,783.04
-399.68
633.27
5,975,158.33
665,120.85
32.00
-170.83
9,470.00
25.61
261.78
8,859.63
8,791.93
-400.33
628.75
5,975,157.58
665,116.34
32.00
-172.93
9,480.00
22.41
261.78
8,868.76
8,801.06
-400.92
624.72
5,975,156.91
665,112.32
32.00
-174.79
9,490.00
19.21
261.78
8,878.11
8,810.41
-401.42
621.21
5,975,156.33
665,108.82
32.00
-176.42
9,500.00
16.01
261.78
8,887.64
8,819.94
-401.86
618.22
5,975,155.83
665,105.84
32.00
-177.81
9,505.00
14.41
261.78
8,892.47
8,824.77
-402.04
616.92
5,975,155.61
665,104.55
32.00
-178.41
9,510.00
13.80
267.87
8,897.31
8,829.61
-402.15
615.71
5,975,155.48
665,103.34
32.00
-178.91
9,520.00
13.10
281.32
8,907.04
8,839.34
-401.98
613.40
5,975,155.60
665,101.03
32.00
-179.49
9,530.00
13.15
295.45
8,916.78
8,849.08
-401.26
611.26
5,975,156.27
665,098.87
32.00
-179.52
9,540.00
13.94
308.72
8,926.51
8,858.81
-400.02
609.29
5,975,157.47
665,096.88
32.00
-178.99
9,550.00
15.36
320.09
8,936.18
8,868.48
-398.25
607.50
5,975,159.20
665,095.05
32.00
-177.90
9,560.00
17.25
329.31
8,945.78
8,878.08
-395.96
605.90
5,975,161.45
665,093.39
32.00
-176.26
9,570.00
19.48
336.62
8,955.27
8,887.57
-393.15
604.48
5,975,164.23
665,091.91
32.00
-174.07
9,580.00
21.94
342.42
8,964.63
8,896.93
-389.84
603.25
5,975,167.51
665,090.62
32.00
-171.34
9,590.00
24.56
347.07
8,973.82
8,906.12
-386.03
602.22
5,975,171.30
665,089.50
32.00
-168.08
9,600.00
27.30
350.85
8,982.81
8,915.11
-381.74
601.39
5,975,175.57
665,088.58
32.00
-164.29
9,610.00
30.13
353.99
8,991.58
8,923.88
-376.98
600.76
5,975,180.31
665,087.85
32.00
-160.00
9,620.00
33.01
356.62
9,000.10
8,932.40
-371.76
600.34
5,975,185.52
665,087.31
32.00
-155.21
9,630.00
35.95
358.88
9,008.34
8,940.64
-366.11
600.12
5,975,191.17
665,086.97
32.00
-149.93
9,640.00
38.92
0.84
9,016.28
8,948.58
-360.03
600.11
5,975,197.24
665,086.82
32.00
-144.19
9,650.00
41.92
2.55
9,023.89
8,956.19
-353.55
600.31
5,975,203.73
665,086.88
32.00
-138.01
9,660.00
44.94
4.08
9,031.16
8,963.46
-346.69
600.71
5,975,210.59
665,087.13
32.00
-131.39
9,670.00
47.98
5.46
9,038.04
8,970.34
-339.47
601.31
5,975,217.83
665,087.57
32.00
-124.37
9,680.00
51.04
6.70
9,044.54
8,976.84
-331.91
602.12
5,975,225.40
665,088.21
32.00
-116.96
9,690.00
54.11
7.85
9,050.61
8,982.91
-324.03
603.13
5,975,233.30
665,089.05
32.00
-109.18
9,700.00
57.19
8.91
9,056.25
8,988.55
-315.86
604.33
5,975,241.49
665,090.07
32.00
-101.07
9,710.00
60.27
9.90
9,061.44
8,993.74
-307.43
605.73
5,975,249.95
665,091.28
32.00
-92.65
9,720.00
63.37
10.83
9,066.17
8,998.47
-298.76
607.31
5,975,258.65
665,092.68
32.00
-83.93
9,730.00
66.47
11.71
9,070.41
9,002.71
-289.88
609.08
5,975,267.57
665,094.25
32.00
-74.96
9,740.00
69.57
12.55
9,074.15
9,006.45
-280.82
611.03
5,975,276.67
665,096.00
32.00
-65.76
9,750.00
72.68
13.35
9,077.38
9,009.68
-271.60
613.15
5,975,285.94
665,097.92
32.00
-56.35
101512021 2:39:28PM Page 7 COMPASS 5000.15 Build 91 E
HALLI B U RTO N
Standard Proposal Report
Database: NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company: Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project: Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site: E
North Reference:
True
Well: Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore: Plan: E-26B
Design: E-26B wp09
Planned Survey
Measured
Vertical
Map
Map
Depth
Inclination Azimuth
Depth
TVDss
+N/-S
+E/-W
Northing
Easting
DLS
Vert Section
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(usft)
(usft)
9,012.40
9,760.00
75.79
14.13
9,080.10
9,012.40
-262.25
615.44
5,975,295.33
665,100.00
32.00
-46.77
9,770.00
78.90
14.89
9,082.29
9,014.59
-252.81
617.88
5,975,304.83
665,102.24
32.00
-37.05
9,780.00
82.02
15.63
9,083.95
9,016.25
-243.29
620.48
5,975,314.39
665,104.62
32.00
-27.21
9,790.00
85.13
16.36
9,085.07
9,017.37
-233.74
623.22
5,975,324.00
665,107.15
32.00
-17.29
9,800.00
88.25
17.09
9,085.64
9,017.94
-224.18
626.09
5,975,333.62
665,109.81
32.00
-7.31
9,810.00
91.37
17.81
9,085.68
9,017.98
-214.64
629.09
5,975,343.22
665,112.60
32.00
2.68
9,820.00
94.49
18.53
9,085.17
9,017.47
-205.16
632.20
5,975,352.78
665,115.51
32.00
12.67
9,830.00
97.60
19.26
9,084.11
9,016.41
-195.75
635.42
5,975,362.25
665,118.52
32.00
22.61
9,837.70
100.00
19.83
9,082.94
9,015.24
-188.58
637.97
5,975,369.47
665,120.91
32.00
30.21
9,840.00
99.77
19.12
9,082.54
9,014.84
-186.44
638.72
5,975,371.63
665,121.61
32.00
32.48
9,850.00
98.76
16.04
9,080.93
9,013.23
-177.03
641.70
5,975,381.10
665,124.39
32.00
42.35
9,860.00
97.73
12.98
9,079.50
9,011.80
-167.45
644.18
5,975,390.73
665,126.66
32.00
52.21
9,870.00
96.67
9.94
9,078.24
9,010.54
-157.73
646.15
5,975,400.49
665,128.41
32.00
62.05
9,880.00
95.60
6.90
9,077.17
9,009.47
-147.90
647.61
5,975,410.35
665,129.65
32.00
71.82
9,890.00
94.51
3.88
9,076.29
9,008.59
-137.98
648.54
5,975,420.29
665,130.37
32.00
81.49
9,900.00
93.41
0.87
9,075.60
9,007.90
-128.02
648.96
5,975,430.26
665,130.56
32.00
91.05
9,910.00
92.30
357.87
9,075.10
9,007.40
-118.03
648.85
5,975,440.24
665,130.24
32.00
100.45
9,912.70
92.00
357.06
9,075.00
9,007.30
-115.34
648.73
5,975,442.93
665,130.06
31.95
102.96
Start Dir
120/100' : 9912.7' MD,
9075'TVD
9,925.00
91.74
355.60
9,074.60
9,006.90
-103.07
647.94
5,975,455.18
665,129.00
12.00
114.29
9,950.00
91.22
352.65
9,073.95
9,006.25
-78.21
645.38
5,975,479.97
665,125.90
12.00
136.95
9,962.70
90.95
351.15
9,073.72
9,006.02
-65.64
643.60
5,975,492.49
665,123.84
12.00
148.24
9,975.00
90.84
352.62
9,073.52
9,005.82
-53.46
641.86
5,975,504.63
665,121.83
12.00
159.19
10,000.00
90.63
355.61
9,073.20
9,005.50
-28.60
639.30
5,975,529.43
665,118.73
12.00
181.85
10,025.00
90.42
358.61
9,072.97
9,005.27
-3.64
638.04
5,975,554.36
665,116.92
12.00
205.03
10,050.00
90.20
1.60
9,072.84
9,005.14
21.36
638.08
5,975,579.35
665,116.42
12.00
228.67
10,052.70
90.18
1.92
9,072.83
9,005.13
24.05
638.16
5,975,582.05
665,116.44
12.00
231.25
10,075.00
90.18
4.60
9,072.76
9,005.06
46.32
639.43
5,975,604.33
665,117.22
12.00
252.70
10,100.00
90.18
7.60
9,072.68
9,004.98
71.18
642.09
5,975,629.24
665,119.33
12.00
277.06
10,125.00
90.18
10.60
9,072.60
9,004.90
95.86
646.04
5,975,654.00
665,122.74
12.00
301.68
10,127.70
90.18
10.92
9,072.59
9,004.89
98.51
646.55
5,975,656.66
665,123.18
12.00
304.35
10,150.00
90.13
8.25
9,072.53
9,004.83
120.50
650.26
5,975,678.72
665,126.41
12.00
326.35
10,175.00
90.08
5.25
9,072.48
9,004.78
145.32
653.19
5,975,703.61
665,128.80
12.00
350.77
10,200.00
90.03
2.25
9,072.46
9,004.76
170.27
654.83
5,975,728.58
665,129.89
12.00
374.88
10,225.00
89.97
359.25
9,072.46
9,004.76
195.26
655.15
5,975,753.57
665,129.67
12.00
398.61
10,250.00
89.92
356.25
9,072.48
9,004.78
220.24
654.17
5,975,778.52
665,128.14
12.00
421.89
10,275.00
89.87
353.25
9,072.53
9,004.83
245.13
651.88
5,975,803.35
665,125.30
12.00
444.67
10,300.00
89.81
350.25
9,072.60
9,004.90
269.87
648.30
5,975,828.01
665,121.18
12.00
466.88
10,325.00
89.76
347.25
9,072.69
9,004.99
294.39
643.42
5,975,852.41
665,115.76
12.00
488.46
10,350.00
89.71
344.25
9,072.81
9,005.11
318.61
637.27
5,975,876.49
665,109.08
12.00
509.34
10,352.70
89.71
343.93
9,072.82
9,005.12
321.21
636.53
5,975,879.07
665,108.28
12.00
511.55
10,375.00
89.71
346.60
9,072.94
9,005.24
342.77
630.85
5,975,900.51
665,102.14
12.00
530.08
10,400.00
89.71
349.60
9,073.06
9,005.36
367.23
625.70
5,975,924.85
665,096.45
12.00
551.52
10,402.70
89.71
349.93
9,073.08
9,005.38
369.89
625.22
5,975,927.49
665,095.91
12.00
553.87
10,425.00
87.03
349.93
9,073.71
9,006.01
391.84
621.32
5,975,949.34
665,091.53
12.00
573.34
101512021 2:39:28PM Page 8 COMPASS 5000.15 Build 91 E
HALLI B U RTO N
Standard Proposal Report
Database: NORTH US + CANADA
Local Co-ordinate Reference:
Well Plan: E-26
Company: Hilcorp Alaska, LLC
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Project: Prudhoe Bay
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
Site: E
North Reference:
True
Well: Plan: E-26
Survey Calculation Method:
Minimum Curvature
Wellbore: Plan: E-26B
Design: E-26B wp09
Planned Survey
Measured
Vertical
Map
Map
Depth
Inclination Azimuth
Depth
TVDss
+N/-S
+E/-W
Northing
Easting
DLS
Vert Section
(usft)
(°)
(°)
(usft)
usft
(usft)
(usft)
(usft)
(usft)
9,007.96
10,450.00
84.03
349.93
9,075.66
9,007.96
416.37
616.96
5,975,973.78
665,086.64
12.00
595.10
10,475.00
81.03
349.93
9,078.91
9,011.21
440.78
612.63
5,975,998.08
665,081.77
12.00
616.75
10,500.00
78.03
349.93
9,083.45
9,015.75
464.98
608.33
5,976,022.18
665,076.94
12.00
638.22
10,525.00
75.03
349.93
9,089.27
9,021.57
488.91
604.08
5,976,046.01
665,072.16
12.00
659.45
10,550.00
72.03
349.93
9,096.36
9,028.66
512.51
599.88
5,976,069.52
665,067.45
12.00
680.39
10,575.00
69.03
349.93
9,104.69
9,036.99
535.72
595.76
5,976,092.62
665,062.82
12.00
700.97
10,592.70
66.91
349.93
9,111.33
9,043.63
551.87
592.89
5,976,108.70
665,059.60
12.00
715.30
10,600.00
66.91
350.88
9,114.20
9,046.50
558.49
591.77
5,976,115.30
665,058.34
12.00
721.19
10,625.00
66.96
354.14
9,123.99
9,056.29
581.30
588.77
5,976,138.03
665,054.84
12.00
741.76
10,650.00
67.08
357.40
9,133.75
9,066.05
604.25
587.08
5,976,160.94
665,052.64
12.00
762.90
10,675.00
67.27
0.64
9,143.45
9,075.75
627.28
586.68
5,976,183.96
665,051.74
12.00
784.54
10,700.00
67.52
3.88
9,153.06
9,085.36
650.34
587.59
5,976,207.03
665,052.15
12.00
806.63
10,712.70
67.67
5.52
9,157.90
9,090.20
662.04
588.56
5,976,218.74
665,052.85
12.00
818.00
10,725.00
69.15
5.52
9,162.43
9,094.73
673.42
589.66
5,976,230.15
665,053.70
12.00
829.12
10,750.00
72.15
5.52
9,170.71
9,103.01
696.90
591.93
5,976,253.67
665,055.46
12.00
852.05
10,775.00
75.15
5.52
9,177.75
9,110.05
720.77
594.23
5,976,277.58
665,057.24
12.00
875.37
10,800.00
78.15
5.52
9,183.52
9,115.82
744.98
596.57
5,976,301.84
665,059.05
12.00
899.02
10,825.00
81.15
5.52
9,188.01
9,120.31
769.46
598.94
5,976,326.36
665,060.88
12.00
922.92
10,850.00
84.15
5.52
9,191.21
9,123.51
794.13
601.33
5,976,351.08
665,062.72
12.00
947.02
10,875.00
87.15
5.52
9,193.11
9,125.41
818.94
603.72
5,976,375.93
665,064.57
12.00
971.26
10,900.00
90.15
5.52
9,193.70
9,126.00
843.82
606.13
5,976,400.85
665,066.43
12.00
995.55
10,925.00
93.15
5.52
9,192.98
9,125.28
868.69
608.53
5,976,425.77
665,068.29
12.00
1,019.84
10,950.84
96.25
5.52
9,190.86
9,123.16
894.32
611.01
5,976,451.45
665,070.20
12.00
1,044.88
10,975.00
96.04
2.61
9,188.28
9,120.58
918.28
612.71
5,976,475.43
665,071.38
12.00
1,068.07
11,000.00
95.81
359.61
9,185.70
9,118.00
943.14
613.20
5,976,500.30
665,071.32
12.00
1,091.73
11,025.00
95.56
356.60
9,183.22
9,115.52
968.00
612.37
5,976,525.13
665,069.95
12.00
1,114.95
11,050.00
95.29
353.60
9,180.86
9,113.16
992.79
610.25
5,976,549.87
665,067.28
12.00
1,137.69
11,075.00
95.01
350.60
9,178.61
9,110.91
1,017.45
606.83
5,976,574.45
665,063.32
12.00
1,159.88
11,100.00
94.72
347.61
9,176.49
9,108.79
1,041.91
602.12
5,976,598.79
665, 058.08
12.00
1,181.46
11,125.00
94.41
344.61
9,174.50
9,106.80
1,066.10
596.14
5,976,622.84
665,051.57
12.00
1,202.36
11,150.84
94.09
341.52
9,172.58
9,104.88
1,090.75
588.63
5,976,647.32
665,043.52
12.00
1,223.21
11,175.00
93.28
344.31
9,171.03
9,103.33
1,113.79
581.55
5,976,670.20
665,035.94
12.00
1,242.67
11,200.00
92.44
347.19
9,169.78
9,102.08
1,137.99
575.40
5,976,694.26
665,029.26
12.00
1,263.54
11,225.00
91.60
350.07
9,168.90
9,101.20
1,162.48
570.48
5,976,718.63
665,023.80
12.00
1,285.07
11,250.00
90.75
352.95
9,168.39
9,100.69
1,187.20
566.79
5,976,743.26
665,019.58
12.00
1,307.23
11,275.00
89.89
355.83
9,168.25
9,100.55
1,212.08
564.35
5,976,768.08
665,016.59
12.00
1,329.94
11,300.00
89.04
358.71
9,168.48
9,100.78
1,237.04
563.16
5,976,793.01
665,014.85
12.00
1,353.15
11,325.00
88.19
1.58
9,169.08
9,101.38
1,262.03
563.22
5,976,818.00
665,014.36
12.00
1,376.79
11,350.84
87.32
4.56
9,170.09
9,102.39
1,287.81
564.60
5,976,843.80
665,015.18
12.00
1,401.61
11,375.00
86.43
7.32
9,171.41
9,103.71
1,311.80
567.10
5,976,867.84
665,017.15
12.00
1,425.10
11,400.00
85.51
10.19
9,173.17
9,105.47
1,336.45
570.90
5,976,892.56
665,020.40
12.00
1,449.63
11,425.00
84.61
13.06
9,175.32
9,107.62
1,360.84
575.91
5,976,917.05
665,024.88
12.00
1,474.33
11,450.84
83.69
16.04
9,177.95
9,110.25
1,385.72
582.37
5,976,942.07
665,030.79
12.00
1,499.95
11,475.00
84.97
13.42
9,180.34
9,112.64
1,408.97
588.48
5,976,965.44
665,036.39
12.00
1,523.92
11,500.00
86.30
10.72
9,182.25
9,114.55
1,433.34
593.69
5,976,989.92
665,041.07
12.00
1,548.66
101512021 2:39:28PM Page 9 COMPASS 5000.15 Build 91 E
HALLIBURTON
Standard Proposal Report
Database:
NORTH US + CANADA
Company:
Hilcorp Alaska, LLC
Project:
Prudhoe Bay
Site:
E
Well:
Plan: E-26
Wellbore:
Plan: E-26B
Design:
E-26B wp09
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth
(usft) (°) (°) (usft)
Local Co-ordinate Reference:
Well Plan: E-26
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Map
Map
TVDss +N/-S +E/-W Northing
Easting DLS Vert Section
usft (usft) (usft) (usft)
(usft) 9,115.87
11,525.00
87.64
8.04
9,183.57
9,115.87
1,457.97
597.76
5,977,014.63
665,044.59
12.00
11,550.00
88.99
5.35
9,184.30
9,116.60
1,482.79
600.67
5,977,039.51
665,046.96
12.00
11,575.00
90.33
2.67
9,184.45
9,116.75
1,507.72
602.42
5,977,064.47
665,048.16
12.00
11,600.00
91.68
359.99
9,184.01
9,116.31
1,532.71
603.01
5,977,089.46
665,048.20
12.00
11,625.00
93.02
357.31
9,182.98
9,115.28
1,557.68
602.42
5,977,114.41
665,047.06
12.00
11,650.84
94.41
354.53
9,181.31
9,113.61
1,583.40
600.58
5,977,140.08
665, 044.66
12.00
11,675.00
94.15
357.42
9,179.51
9,111.81
1,607.43
598.89
5,977,164.07
665,042.45
12.00
11,700.00
93.87
0.42
9,177.76
9,110.06
1,632.36
598.42
5,977,188.98
665,041.43
12.00
11,725.00
93.58
3.41
9,176.13
9,108.43
1,657.29
599.25
5,977,213.92
665,041.72
12.00
11,750.00
93.28
6.40
9,174.64
9,106.94
1,682.15
601.39
5,977,238.82
665,043.30
12.00
11,775.00
92.98
9.39
9,173.27
9,105.57
1,706.87
604.82
5,977,263.61
665,046.19
12.00
11,800.00
92.66
12.38
9,172.04
9,104.34
1,731.39
609.53
5,977,288.23
665,050.36
12.00
11,825.00
92.34
15.36
9,170.95
9,103.25
1,755.64
615.52
5,977,312.59
665,055.81
12.00
11,850.00
92.01
18.34
9,170.01
9,102.31
1,779.54
622.76
5,977,336.65
665,062.53
12.00
11,875.00
91.67
21.33
9,169.20
9,101.50
1,803.04
631.24
5,977,360.33
665,070.49
12.00
11,900.84
91.32
24.41
9,168.53
9,100.83
1,826.84
641.27
5,977,384.34
665,080.00
12.00
11,925.00
90.67
21.58
9,168.11
9,100.41
1,849.08
650.71
5,977,406.78
665,088.95
12.00
11,950.00
89.99
18.66
9,167.96
9,100.26
1,872.55
659.31
5,977,430.43
665,097.03
12.00
11,975.00
89.31
15.74
9,168.11
9,100.41
1,896.43
666.70
5,977,454.46
665,103.90
12.00
12,000.00
88.64
12.82
9,168.56
9,100.86
1,920.65
672.87
5,977,478.81
665,109.53
12.00
12,025.00
87.96
9.89
9,169.30
9,101.60
1,945.14
677.78
5,977,503.41
665,113.91
12.00
12,052.00
87.24
6.73
9,170.43
9,102.73
1,971.83
681.68
5,977,530.18
665,117.22
12.00
Total Depth : 12052'
MD, 9170.43' TVD - 2
7/8" x 4 1/4"
Targets
Target Name
hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing
Shape (°) (°) (usft) (usft) (usft) (usft)
E-26B wp08 Polygon
0.00 0.00 9,082.70
-323.52
plan misses target center by 188.22usft
at 9742.22usft MD (9074.91 TVD,-278.78
N, 611.49 E)
Polygon
Point 1
9,082.70
0.01
Point 2
9,082.70
-19.14
Point 3
9,082.70
629.88
Point 4
9,082.70
1,803.65
Point 5
9,082.70
2,653.53
Point 6
9,082.70
2,824.11
Point 7
9,082.70
2,763.17
Point 8
9,082.70
2,605.18
Point 9
9,082.70
1,699.65
Point 10
9,082.70
617.38
Point 11
9,082.70
0.02
1,573.26
1,597.67
1,621.81
1,645.61
1,669.02
1,692.73
1,714.88
1,738.29
1,762.13
1,786.32
1,810.81
1,835.52
1,860.39
1,885.35
1,910.33
1,936.11
1,960.20
1,985.19
2,010.18
2,035.08
2,059.84
2,086.34
Easting
(usft)
794.15
5,975,238.00
665,280.00
-1.00
5,975,237.99
665,279.00
-222.49
5,975,213.99
665,058.00
-350.29
5,975,860.00
664,916.00
-414.56
5,977,032.00
664,826.00
-168.85
5,977,887.00
665,053.00
-102.08
5,978,059.00
665,116.00
213.68
5,978,005.00
665,433.00
165.20
5,977,846.00
665,388.00
-5.72
5,976,937.00
665,237.00
-8.46
5,975,855.00
665,258.00
-1.00
5,975,238.00
665,279.00
101512021 2:39:28PM Page 10 COMPASS 5000.15 Build 91E
HALLIBURTON
Standard Proposal Report
Database: NORTH US + CANADA
Company: Hilcorp Alaska, LLC
Project:
Prudhoe Bay
Site:
E
Well:
Plan: E-26
Wellbore:
Plan: E-26B
Design:
E-26B wp09
Casing Points
Measured
Vertical
Depth
Depth
(usft)
(usft)
9,286.00
8,758.07 4 1/2" TOW
12,052.00
9,170.43 2 7/8" x 4 1 /4"
Plan Annotations
Measured
Vertical
Depth
Depth
(usft)
(usft)
9,285.00
8,757.90
9,305.00
8,761.61
9,912.70
9,075.00
12,052.00
9,170.43
Local Co-ordinate Reference:
Well Plan: E-26
TVD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
MD Reference:
KB @ 67.70usft (ORIG KELLY BUSHING)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Casing Hole
Diameter Diame
Name () ( )
4-1/2
2-7/8
Local Coordinates
+N/-S
+E/-W
(usft)
(usft)
Comment
-379.59
772.39
KOP : Start Dir 9'/100' : 9285' MD, 8757.9'TVD : 180' RT TF
-382.40
752.94
Start Dir 320/100' : 9305' MD, 8761.6l'TVD
-115.34
648.73
Start Dir 12°/100' : 9912.7' MD, 90757VD
1,971.83
681.68
Total Depth: 12052' MD, 9170.43' TVD
101512021 2:39:28PM Page 11 COMPASS 5000.15 Build 91E
Hilcorp Alaska, LLC
Prudhoe Bay
E
Plan: E-26
Plan: E-26B
5002921781
E-26B wp09
Sperry Drilling Services
Clearance Summary
Anticollision Report
05 October, 2021
Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)
Reference Design: E - Plan: E-26 - Plan: E-26B - E-26B wp09
Well Coordinates: 5,975,544.00 N, 664,479.00 E (70' 20' 22.15" N, 148' 39' 54.89" W)
Datum Height: KB @ 67.70usft (ORIG KELLY BUSHING)
Scan Range: 9,285.00 to 12,052.00 usft. Measured Depth.
Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft
Geodetic Scale Factor Applied
Version: 5000.15 Build: 91E
Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Scan Type: 25.00
w HALLIBURTON
Sperry Drilling Services
Hilcorp Alaska, LLC
HALLIBURTON
Prudhoe Bay
Anticollision Report for Plan: E-26 - E-26B wp09
Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)
Reference Design: E - Plan: E-26 - Plan: E-26B - E-26B wp09
Scan Range: 9,285.00 to 12,052.00 usft. Measured Depth.
Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited.
Max Ellipse
Separation is 1,000.00 usft
Measured
Minimum
@Measured
Ellipse
@Measured
Clearance
Summary Based on
Site Name
Depth
Distance
Depth Separation
Depth
Factor
Minimum
Separation Warning
Comparison Well Name - Wellbore Name - Design
(usft)
(usft)
(usft)
(usft)
usft
E
E-01 - E-01 - E-01
12,044.24
1,234.43
12,044.24
998.11
9,191.47
5.223
Centre Distance
Pass -
E-01 - E-01 - E-01
12,052.00
1,234.52
12,052.00
996.87
9,192.40
5.195
Clearance Factor
Pass -
E-01 - E-01A- E-01A
12,035.00
1,234.55
12,035.00
999.80
9,190.33
5.259
Clearance Factor
Pass -
E-01 - E-01A- E-01A
12,052.00
1,231.48
12,052.00
1,076.41
10,613.52
7.942
Centre Distance
Pass -
E-01 - E-01APB1 - E-01APB1
11,985.00
1,239.43
11,985.00
1,012.92
9,183.41
5.472
Clearance Factor
Pass -
E-01 - E-01APB1 - E-01APB1
12,052.00
1,204.17
12,052.00
1,044.13
10,678.00
7.524
Centre Distance
Pass -
E-01 - E-01B - E-01B
12,052.00
516.37
12,052.00
278.42
11,350.00
2.170
Clearance Factor
Pass -
E-05 - E-05C - E-05C
9,285.00
693.41
9,285.00
624.73
12,597.72
10.096
Centre Distance
Pass -
E-05 - E-05C - E-05C
9,660.00
715.82
9,660.00
614.14
12,647.00
7.040
Ellipse Separation
Pass -
E-05 - E-05C - E-05C
9,835.00
753.42
9,835.00
642.30
12,647.00
6.780
Clearance Factor
Pass -
E-07 - E-07A - E-07A
12,052.00
1,317.08
12,052.00
1,193.06
10,042.00
10.619
Clearance Factor
Pass -
E-12 - E-12 - E-12
11,418.95
675.90
11,418.95
520.94
9,223.28
4.362
Centre Distance
Pass -
E-12 - E-12 - E-12
11,435.00
676.33
11,435.00
520.23
9,228.47
4.333
Ellipse Separation
Pass -
E-12 - E-12 - E-12
11,685.00
690.27
11,685.00
521.53
9,284.74
4.091
Clearance Factor
Pass -
E-12 - E-12A- E-12A
11,680.74
109.92
11,680.74
70.16
9,837.94
2.765
Centre Distance
Pass -
E-12 - E-12A- E-12A
11,685.00
109.99
11,685.00
70.04
9,836.80
2.753
Ellipse Separation
Pass -
E-12 - E-12A- E-12A
11,835.00
188.02
11,835.00
95.53
9,807.19
2.033
Clearance Factor
Pass -
E-16 - E-16 - E-16
9,760.00
539.57
9,760.00
432.24
9,060.31
5.027
Clearance Factor
Pass -
E-16 - E-16 - E-16
9,762.61
539.56
9,762.61
432.25
9,061.04
5.028
Centre Distance
Pass -
E-16 - E-16A - E-16A
9,660.00
569.10
9,660.00
464.40
8,966.53
5.436
Clearance Factor
Pass -
E-16 - E-16A - E-16A
9,685.00
567.54
9,685.00
463.41
8,972.63
5.450
Ellipse Separation
Pass -
E-16 - E-16A - E-16A
9,702.07
567.22
9,702.07
463.54
8,972.63
5.471
Centre Distance
Pass -
E-16 - E-16APB1 - E-16APB1
9,585.00
573.42
9,585.00
467.40
8,890.24
5.408
Clearance Factor
Pass -
E-16 - E-16APB1 - E-16APB1
9,710.00
563.19
9,710.00
460.92
8,919.01
5.507
Ellipse Separation
Pass -
E-16 - E-16APB1 - E-16AP131
9,714.13
563.18
9,714.13
461.03
8,919.54
5.513
Centre Distance
Pass -
E-20 - E-20C - E-20C
9,285.00
1,381.29
9,285.00
1,292.82
11,039.00
15.612
Clearance Factor
Pass -
E-34 - E-34 - E-34
12,052.00
1,071.76
12,052.00
983.71
8,730.40
12.173
Clearance Factor
Pass -
E-34 - E-34A - E-34A
12,052.00
1,071.76
12,052.00
984.30
8,730.40
12.255
Clearance Factor
Pass -
05 October, 2021 - 14:41
Page 2 of 6
COMPASS
Hilcorp Alaska, LLC
HALLIBURTON
Anticollision Report for Plan: E-26 - E-26B wp09
Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)
Reference Design: E - Plan: E-26 - Plan: E-26B - E-26B wp09
Scan Range: 9,285.00 to 12,052.00 usft. Measured Depth.
Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft
Prudhoe Bay
Measured
Minimum
@Measured
Ellipse
@Measured
Clearance
Summary Based on
Site Name
Depth
Distance
Depth
Separation
Depth
Factor
Minimum
Separation Warning
Comparison Well Name - Wellbore Name - Design
(usft)
(usft)
(usft)
(usft)
usft
E-34 - E-341-1 - E-341-1
12,052.00
1,071.76
12,052.00
983.71
8,730.40
12.173
Clearance Factor
Pass -
E-35 - E-35 - E-35
10,396.94
998.06
10,396.94
938.62
8,594.70
16.791
Ellipse Separation
Pass -
E-35 - E-35 - E-35
10,535.00
1,018.04
10,535.00
956.43
8,581.63
16.523
Clearance Factor
Pass -
E-35 - E-35A- E-35A
10,396.94
998.06
10,396.94
938.61
8,594.70
16.789
Ellipse Separation
Pass -
E-35 - E-35A- E-35A
10,535.00
1,018.04
10,535.00
956.43
8,581.63
16.522
Clearance Factor
Pass -
E-35 - E-35B - E-35B
9,603.11
185.99
9,603.11
97.51
10,995.08
2.102
Centre Distance
Pass -
E-35 - E-35B - E-35B
9,635.00
190.81
9,635.00
94.11
11,009.19
1.973
Clearance Factor
Pass -
E-35 - E-35C - E-35C
10,087.20
969.43
10,087.20
911.53
8,742.00
16.745
Ellipse Separation
Pass -
E-35 - E-35C - E-35C
10,535.00
999.42
10,535.00
933.98
8,742.00
15.272
Clearance Factor
Pass -
E-35 - E-35PB1 - E-35PB1
10,396.94
998.06
10,396.94
938.49
8,594.70
16.754
Ellipse Separation
Pass -
E-35 - E-35PB1 - E-35PB1
10,535.00
1,018.04
10,535.00
956.30
8,581.63
16.488
Clearance Factor
Pass -
E-36 - E-36A- E-36A
12,052.00
1,232.79
12,052.00
1,080.41
11,861.00
8.090
Clearance Factor
Pass -
E-38 - E-38 - E-38
10,960.00
545.27
10,960.00
485.79
9,475.84
9.166
Clearance Factor
Pass -
E-38 - E-38 - E-38
11,310.00
417.93
11,310.00
380.21
9,363.72
11.079
Ellipse Separation
Pass -
E-38 - E-38 - E-38
11,319.84
417.82
11,319.84
380.38
9,358.52
11.160
Centre Distance
Pass -
E-38 - E-38PB1 - E-38PB1
10,535.00
729.57
10,535.00
630.91
9,777.00
7.395
Clearance Factor
Pass -
E-38 - E-38PB1 - E-38PB1
11,327.39
435.05
11,327.39
397.56
9,328.79
11.604
Ellipse Separation
Pass -
E-38 - E-38PB2 - E-38PB2
10,610.00
691.11
10,610.00
596.35
9,780.00
7.293
Clearance Factor
Pass -
E-38 - E-38PB2 - E-38PB2
11,327.39
435.05
11,327.39
397.56
9,328.79
11.604
Ellipse Separation
Pass -
Plan: E-26 - E-26 - E-26
9,285.00
498.09
9,285.00
487.49
8,852.02
46.984
Ellipse Separation
Pass -
Plan: E-26 - E-26 - E-26
9,310.00
521.88
9,310.00
510.41
8,844.36
45.494
Clearance Factor
Pass -
Plan: E-26 - E-26A - E-26A
9,585.00
192.73
9,585.00
190.07
9,480.20
72.438
Ellipse Separation
Pass -
Plan: E-26 - E-26A - E-26A
9,910.00
409.63
9,910.00
402.02
9,410.99
53.802
Clearance Factor
Pass -
05 October, 2021 - 14:41 Page 3 of 6 COMPASS
Hilcorp Alaska, LLC
HALLIBURTON
Anticollision Report for Plan: E-26 - E-26B wp09
Survey too/ program
From
To
(usft)
(usft)
99.98
7,899.98
7,975.98
9,285.00
9,285.00
12,052.00 E-26B wp09
Ellipse error terms are correlated across survey tool tie -on points.
Calculated ellipses incorporate surface errors.
Separation is the actual distance between ellipsoids.
Distance Between centres is the straight line distance between wellbore centres.
Survey/Plan
Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation).
All station coordinates were calculated using the Minimum Curvature method.
Survey Tool
3_Gyro-CT_pre-1998_Csg
3 MWD
3 MWD
Prudhoe Bay
05 October, 2021 - 14:41 Page 4 of 6 COMPASS
Project: Prudhoe Bay REFERENCE INFORMATION
HALLIBURTON
WELL DETAE SPlan: E-26 NAD 1927 (NADCON CONUS) Alaska Zone 04
Site: E Co-ordinate (WE) Reference: Well Plan: E-26, True
North
Sperry drilling Well: Plan: E-26
Vertical (TVD) Reference: KB @ 67.70usft (ORIG KELLY BUSHING) Ground Level: 29.97
Wellbore: Plan: E-26B
Measured Depth Reference: KB @ 67.70usft (ORIG KELLY BUSHING) +N/-S +F/-W Northing
Easting Latitude Longitude
Calculation Method: Minimum Curvature
Plan: E-26B wp09
0.00 0.00 5975544.00 664479.00 70' 20' 22.1517 N 1480 39' 54.8881
W
SURVEY PROGRAM
NO GLOBAL FILTER: Using user defined selection & filtering criteria
EM
Date: 2021-10-04T00:00:00 Validated: Yes Version: 9285.00 To 12052.00
Ladder / S.F. Plots Depth From Depth To Survey/Plan
99.98 7899.98 E26 Survey 1 GCT MS (E-26)
Tool CASING DETAi1.S
3_Gyro-CTyre-1998_Csg
7975.98 9285.00 E-26A Survey #2 MWD (E-26A)
3_MWD
9285.00 12052.00 E-26B wp09 (Plan: E-26B)
3_MWD TVD TVDSS MD Size Name
8758.07 8690.37 9286.00 4-1/2 4 1/2" TOW
9170.43 9102.73 12052.00 2-7/8 2 7/8" x 4 1/4"
180.00
50.00
rn
O
E-1
0
320.00
c
0
Q90.00
N
W
N
60.00
U
0
a>
c 30.00
6
C)
/
0.00
9300 9450 9600 9750 9900 10050
10200
10350 10500 10650 10800 10950 11100 11250 11400 11550
11700 11850 12000 12150
Measured Depth (300
usft/in)
4.00
E-1
A
0
i� 3.00
LL
1B
0
2.00
td
0-
IS!oil
IS
roc
re
e
(D
U)
on
Avoidance
equi
1.00
No
-Go Zone
-Stop
rillIng
1
0.00 11
9300 9450 9600 9750 9900 10050
10200
10350 10500 10650 10800 10950 11100 11250 11400 11550
11700 11850 12000 12150
Measured Depth (300
usft/in)
Well Bighole
CDR2-AC 4 Ram BOP Schematic Date 15-Jan-21
Quick Test Sub to Otis
1.1 ft
Top of7"Otis
O.Oft
.-.-.-.-.-.-. .-.-.
4 CDR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
7-1/16" 5k Flange X 7" Otis Box
Top of Annular
6.0 ft
o 0
Hydril 7 1/16"
Top of Annular Element
6.7 ft
Annular
Bottom Annular
8.0 ft
CL Blind/Shears
9.3 ft
CL 2-3/8" Pipe/Slips
10.1 ft
IB2
F
B1
B3 B4 Choke Line
Kill Line
CL 3" Pipe/Slips 1 12.6 ft11.
CL 2-3/8" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft
CL of Flow Cross 17.4 ft
CL of Master 18.8 ft
LDS
LDS
Ground Level
s- Swab
T1 T2
Master
IA
OA
Test Pump Hose
TRANSMITTAL LETTER CHECKLIST
WELL NAME: PBU E-26B
PTD: 221-084
X Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: Prudhoe Bay Unit POOL: Prudhoe Bay Oil
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50-
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
Pilot Hole
well name ( PH) and API number
(50- ) from records, data and logs acquired for
well name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Spacing
Approval to produce/inject is contingent upon issuance of
Exception
a conservation order approving a spacing exception.
( ) as Operator assumes the liability
of any protest to the spacing exception that may occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
Production or production testing of coal bed methane is not allowed for
Non-
well ( ) until after ( )
Conventional
has designed and implemented a water well testing program to provide
Well
baseline data on water quality and quantity.
( ) must contact the AOGCC to obtain
advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
X
by ( ) in the attached application,
the following well logs are also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
X
within 90 days after completion, suspension or abandonment of this
well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT E-26B Program DEV Well bore seg ❑ I
PTD#:2210840 Company Hilcoro North Slooe. LLC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal n
Appr Date
DLB 10/13/2021
Engineering
Appr Date
MGR 10/14/2021
2 Lease number appropriate
Yes
3 Unique well name and number
Yes
4 Well located in a defined pool
Yes
5 Well located proper distance from drilling unit boundary
Yes
6 We_lllocatedproperdistancefromotherwells- - -------------------------
Yes ------------ -- -- -- -- -- -- -- --
7 Sufficient acreage available in drilling unit
Yes - - - - -
8 If deviated, is wellbore plat included
Yes Directional plan view included, no land plat in package..
9 Operator only affected party
Yes
10 Operator has appropriate_ bond in force_
Yes
11 Permit can be issued without conservation order
----------------------------------------------------------------------------------------------
Yes
12 Permit can be issued without administrative approval
Yes
13 Can permit be approved before 15-day wait
Yes
14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For
s NA
15 All wells within 1/4 mile area of review identified (For service well only)
NA
16 Pre -produced_ injector: duration of pre -production less-than-3- months (For service well only)
NA_
17 Nonconven. gas conforms to_AS31 05.030Q.1 A),(j.2.A-D)- - - - - - - - - - - - - - - - - - -
- NA_
18 Conductor string provided
Yes
E-26B is an'in-zone' sidetrack from an existing slotted production liner
19 Surface casing protects all known USDWs
Yes
E-26B is an'in-zone' sidetrack from an existing slotted production liner
20 CMT_ vol_ adequate_ to circulate on conductor_& surf csg
Yes
E-26B is an In -zone' sidetrack from an existing slotted production_ liner_ _
21 CMT_vol-adequate _to tie-in long string to surf csg
Yes
E-26B is an'in-zone' sidetrack from an existing slotted production_ liner_
22 CMT will cover all known productive horizons
Yes
Fully cemented production liner - all 'in -zone'.
23 Casing designs adequate for C, T, B & permafrost
Yes
E-26B is an'in-zone' sidetrack from an existing slotted production liner
24 Adequate tankage or reserve pit
Yes
CDR2 has adequate tankage and good truck support
25 If a_re-drill, has_a_ 1.0-403 for abandonment been approved
Yes
32.1-540 anbandonment sundry is approved. - -
26 Adequate wellbore separation proposed
Yes
No collision risks identified in Halliburton collision scan
27 If diverter required, does it meet regulations
NA
E-26B is an 'in -zone' sidetrack from an existing slotted production liner
28 Drilling fluid program schematic &_equip list adequate
Yes
All fluids overbalanced -to pore pressure.
29 BOPEs, do they meet_ regulation - - - - - - - - - - - - - - - - - - - - -
- - - - Yes
1 CT packoff, 1 annular, 4_ram CTD stack.
30 BOPE press rating appropriate; test to (put psig in comments)
Yes
5000 psi CTD stack
31 Choke manifold complies w/API RP-53 (May 84)
Yes
32 Work will occur without operation shutdown ----------------
Yes
33 Is presence of H2S gas probable
Yes
PBU E pad is an H2S pad. H2S monitoring will be in place.
34 -Mechanical condition of -wells with_in_AOR verified _(For _service well only)
NA_
E-26B is a planned -producer ._ - - - - - - - - - -
35 Permit can be issued w/o hydrogen sulfide measures
Geology 36 Data presented on potential overpressure zones
Appr Date 37 Seismic analysis of shallow gas zones
DLB 10/13/202, 38 Seabed condition survey (if off -shore)
39 Contact name/phone for weekly progress reports [exploratory only]
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Commissioner Date
JLC 10/15/2021
No E-Pad wells are H2S-bearing. H2S measures are required.
Yes CTD MPD will be employed.
NA
NA
NA