Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout222-0307. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU M-201
Commence MI Injection Per AIO 25A.024
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
222-030
50-029-23711-00-00
18744
Conductor
Surface
Tieback
Production
Liner
5200
80
7754
7070
11393
18478
20"
9-5/8"
7"
7" x 4-1/2"
5249
27 - 107
27 - 7781
25 - 7095
7087 - 18480
27 - 107
27 - 5178
25 - 4991
4987 - 5249
None
4760 / 3090
5410
7500
None
6870 / 5750
7240
8430
8015 - 18216
4-1/2" 12.6# L-80 22 - 7253
5178 - 5268
Structural
4-1/2" HES TNT Perm Packer
2225, 1914
7148
5015
Torin Roschinger
Operations Manager
Tyson Shriver
tyson.shriver@hilcorp.com
907-564-4542
PRUDHOE BAY, POLARIS OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028257, 0028260, 0047448
22 - 5060
N/A
N/A
2004
907 50
0
1938
2773
N/A
13b. Pools active after work:POLARIS OIL
HES RS 25 Non-SC SSSV
7148, 5015
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.08.20 06:37:59 -
08'00'
Torin
Roschinger
(4662)
By Grace Christianson at 1:51 pm, Aug 20, 2024
RBDMS JSB 082824
DSR-8/21/24WCB 10-2-2024
ACTIVITY DATE SUMMARY
7/29/2024
Hot DSL WAG Swap (WAG SWAP) Pumped 3 bbls 50/50 meth and 138 bbls 180*
DSL down Tbg. Pad Op notified of well status per LRS departure. SV,WV,SSV=C
MV=-O IA.,OA=OTG
8/3/2024
***WELL S/I ON ARRIVAL***
R/U POL 61
***WSR CONT ON 8-4-24***
8/4/2024
***WSR CONT FROM 8-3-24***
DRIFTED TO & EQUALIZED 4-1/2'' RED SPYDER @ 2225' MD
PULLED 4-1/2'' RED SPYDER FROM 2225' MD
BRUSHED w/ 4-1/2'' BLB, 3.80'' CENT, BRUSHED X-NIP @ 2225' MD
SET 3.81'' X-LOCK (eq sub 4 x 3/16" & 4 x 1/8'' ports), 4-1/2" REDSPIDER(oal=48",
w/ secondary lockdown, sn=RS-25) @ 2225' MD (tag hung on master)
RAN 4-1/2'' CHECK SET TO RED SPYDER @ 2225' MD (sheared)
PERFORM PASSING DRAW DOWN TEST
***JOB COMPLETE, WELL LEFT S/I***
Daily Report of Well Operations
PBU M-201
1
Regg, James B (OGC)
From:Regg, James B (OGC)
Sent:Thursday, November 30, 2023 3:54 PM
To:Oliver Sternicki
Subject:RE: 20 AAC 25.265(j) temporary SSSV removal clarification
Thanks for taking my call. Yes, temporarily removing the SSSV from M‐201 for evaluaƟng the effect the MCX valve has
on the injecƟon rate falls under 20 AAC 25.265(j).
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907‐793‐1236
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Thursday, November 30, 2023 10:22 AM
To: Regg, James B (OGC) <jim.regg@alaska.gov>
Subject: 20 AAC 25.265(j) temporary SSSV removal clarification
Mr. Regg,
PBU well M‐201 (PTD# 222030) is a produced water injector that is required to have a SSSV due to being within 660’ of a
navigable waterway. We have found that there is a large difference between the injecƟon rate of the well when it is on
normal injecƟon (SSSV installed) vs when we have conducted downhole work such as iprofs with the SSSV
removed. Even with the largest bean size installed in the MCX valve the injecƟon rates into the well are dramaƟcally
lower and at a higher pressure than we have seen in iprofs. We would like to temporarily remove the SSSV from M‐201
and place the well on injecƟon to see if the injecƟon rate remains high, indicaƟng that the MCX is acƟng as a significant
choke or if the injecƟon rate reduces over the course of a few days, indicaƟng that the higher rates observed during
logging are a funcƟon of replacing near wellbore volume aŌer a shut‐in. I wanted to verify that removal of the SSSV as
we propose falls under 25.265(j) as “rouƟne well pad or plaƞorm operaƟons”.
Regards,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Supervisor
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
PBU M-201PTD 2220300
Nolan Vlahovich Hilcorp Alaska, LLC
Geo Tech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 06/13/2023
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20230417
Well API #PTD #Log Date Log Company Log Type AOGCC
Eset#
MPU B-21 50029215350000 186023 5/8/2023 HALLIBURTON Jewelry Log
MPU B-21 50029215350000 186023 5/12/2023 HALLIBURTON Leak Detection Log
MPU B-21 50029215350000 186023 5/13/2023 HALLIBURTON Multi Finger Caliper Report
MPU I-04A 50029220680100 201092 4/17/2023 HALLIBURTON Cement Bond Log
NS-16A 50029230960100 206141 4/3/2023 HALLIBURTON RBT
NS-23 50029231460000 203050 4/25/2023 HALLIBURTON RBT
PBU 09-24A 50029214280100 223003 4/9/2023 HALLIBURTON RBT-Coilflag
PBU C-26A 50029208340100 198145 3/17/2023 HALLIBURTON Production Profile
PBU M-201 50029237110000 222030 5/29/2023 HALLIBURTON Inj. Profile
PBU S-32A 50029220990100 212082 5/23/2023 HALLIBURTON CAST CBL
PBU S-37A 50029222910100 212092 5/19/2023 HALLIBURTON RBT
PBU V-221 50029232460000 205013 5/14/2023 HALLIBURTON Inj. Profile
PBU W-04 50029219070000 189008 3/8/2023 HALLIBURTON CAST CBL
PBU W-209 50029231700000 203128 5/13/2023 HALLIBURTON Inj. Profile
PBU W-219 50029234290000 210105 4/16/2023 HALLIBURTON Inj. Profile
PBU Z-223 50029237200000 222080 2/28/2023 HALLIBURTON Inj. Profile
SRU 213B-15 50133206540000 215130 4/28/2023 HALLIBURTON Perf
Please include current contact information if different from above.
T37729
T37729
T37729
T37730
T37731
T37732
T37733
T37734
T37735
T37736
T37737
T37738
T37739
T37740
T37741
T37742T37743
PBU M-201 50029237110000 222030 5/29/2023 HALLIBURTON Inj. Profile
Kayla
Junke
Digitally signed by
Kayla Junke
Date: 2023.06.13
13:09:15 -08'00'
Post Office Box 244027
Anchorage, AK 99524-4027
3800 Centerpoint Drive
Suite 1400
Anchorage, AK 99503
Phone: (907) 564-4891
01/12/2023
Mr. Mel Rixse
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor
through 4Q 2022.
Dear Mr. Rixse,
Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off
with cement, corrosion inhibitor in the surface casing by conductor annulus through the end of 4Q
2022. Cement top-offs are executed as needed to mitigate the void space left at surface by minor
cement fallback during the primary surface casing by conductor cement job. The remaining void
space between the top of the cement and the top of the conductor is filled with a heavier than water
corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached
spreadsheets include the well names, API and PTD numbers, treatment dates and volumes.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that
the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations.
If you have any additional questions, please contact me at 564-4891 or
oliver.sternicki@hilcorp.com.
Sincerely,
Oliver Sternicki
Well Integrity Engineer
Hilcorp North Slope, LLC
By Samantha Carlisle at 3:53 pm, Jan 12, 2023
Digitally signed by Oliver Sternicki
(4525)
DN: cn=Oliver Sternicki (4525),
ou=Users
Date: 2023.01.12 14:52:49 -09'00'
Oliver Sternicki
(4525)
Kyle Wiseman Hilcorp Alaska, LLC
Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: Kyle.Wiseman@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 11/18/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20221118
Well API #PTD #Log Date Log
Company Log Type AOGCC
Eset#
PBU F-29B 50029216270200 211147 8/20/2022 Halliburton SpinnerPressTemp
PBU L-202 50029232290000 204196 10/24/2022 Halliburton PPROF
PBU L-222 50029234200000 209119 10/21/2022 Halliburton IPROF
PBU M-201 50029237110000 222030 10/17/2022 Halliburton IPROF
Please include current contact information if different from above.
By Meredith Guhl at 2:37 pm, Nov 18, 2022
T37276
T37277
T37278
T37279PBU M-201 50029237110000 222030 10/17/2022 Halliburton IPROF
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2022.11.18 14:44:07 -09'00'
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-23711-00-00Well Name/No.PRUDHOE BAY UN POL M-201Completion Status1WINJCompletion Date4/29/2022Permit to Drill2220300OperatorHilcorp North Slope, LLCMD18744TVD5200Current Status1WINJ9/9/2022UICYesWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:ROP, AGR, DGR, ABG, EWR, ADR MD & TVDNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleDF5/24/20227770 18706 Electronic Data Set, Filename: PBU M-201 ADR Quadrants All Curves.las36552EDDigital DataDF5/24/20227770 18706 Electronic Data Set, Filename: PBU M-201 ADR Quadrants All Curves.las36552EDDigital DataDF5/24/2022100 18744 Electronic Data Set, Filename: PBU M-201 LWD Final.las36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 ADR Image.dlis36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 ADR Image.ver36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Geosteering End of Well Plot.emf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Geosteering End of Well Plot.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Geosteering End of Well Report.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Post-Well Geosteering X-Section Summary.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Post-Well Geosteering X-Section Summary.pptx36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Geosteering End of Well Plot Hi-Res.tif36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 Geosteering End of Well Plot.tif36552EDDigital DataDF5/24/2022 Electronic File: MPU I-29 LWD Final TVD.cgm36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final MD.cgm36552EDDigital DataFriday, September 9, 2022AOGCC Page 1 of 3PBU M-201 LWDFinal.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-23711-00-00Well Name/No.PRUDHOE BAY UN POL M-201Completion Status1WINJCompletion Date4/29/2022Permit to Drill2220300OperatorHilcorp North Slope, LLCMD18744TVD5200Current Status1WINJ9/9/2022UICYesWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYCompletion Date: 4/29/2022Release Date: 3/24/2022DF5/24/2022 Electronic File: M-201_Definitive Survey Report.pdf36552EDDigital DataDF5/24/2022 Electronic File: M-201_Definitive Survey Report.txt36552EDDigital DataDF5/24/2022 Electronic File: M-201_Definitive Surveys.xlsx36552EDDigital DataDF5/24/2022 Electronic File: M-201_GIS.txt36552EDDigital DataDF5/24/2022 Electronic File: M-201_Plan.pdf36552EDDigital DataDF5/24/2022 Electronic File: M-201_VSec.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final MD.emf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final TVD.emf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 ADR Image.dlis36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 ADR Image.ver36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final MD.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final TVD.pdf36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final MD.tif36552EDDigital DataDF5/24/2022 Electronic File: PBU M-201 LWD Final TVD.tif36552EDDigital DataFriday, September 9, 2022AOGCC Page 2 of 3
DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-23711-00-00Well Name/No.PRUDHOE BAY UN POL M-201Completion Status1WINJCompletion Date4/29/2022Permit to Drill2220300OperatorHilcorp North Slope, LLCMD18744TVD5200Current Status1WINJ9/9/2022UICYesComments:Compliance Reviewed By:Date:Date CommentsDescriptionFriday, September 9, 2022AOGCC Page 3 of 3M. Guhl9/9/2022
By Anne Prysunka at 11:42 am, Aug 04, 2022
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, July 21, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Matt Herrera
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
M-201
PRUDHOE BAY UN POL M-201
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/21/2022
M-201
50-029-23711-00-00
222-030-0
W
SPT
5015
2220300 1500
978 980 982 984
134 326 323 327
INITAL P
Matt Herrera
6/25/2022
MIT-IA performed to 2000 PSI per Operations post DHD from failed previous Initial MIT-IA performed on 6/7/22. Inconsistent rising injection
pressures and temp prohibited accurate determination as to whether well had defined pressure stabilization. It was determined to be a pass after
review by J. Regg.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN POL M-201
Inspection Date:
Tubing
OA
Packer Depth
536 2037 1979 1983IA
986
331
45 Min
1989
988
336
60 Min
1996
Rel Insp Num:
Insp Num:mitMFH220629125933
BBL Pumped:1 BBL Returned:1
Thursday, July 21, 2022 Page 1 of 1
56 psi total pressure loss = 2.7% of initial test pressure; jbr
By Meredith Guhl at 1:30 pm, Jun 21, 2022
Completed
4/29/2022
MDG
RBDMS 6/21/2022 MDG
G
DSR-6/21/22MGR07SEP2022DLB 08/24/2022
6.21.2022
Digitally signed by Monty M Myers
DN: cn=Monty M Myers, c=US,
o=Hilcorp Alaska, LLC, ou=Technical
Services - AK Drilling,
email=mmyers@hilcorp.com
Reason: I am approving this document
Date: 2022.06.21 12:37:25 -08'00'
Monty M
Myers
CASING AND LEAK-OFF FRACTURE TESTS
Well Name:PBU M-201 Date:4/17/2022
Csg Size/Wt/Grade: Supervisor:Lot/Amend
Csg Setting Depth:7781 TMD 5178 TVD
Mud Weight:9.5 ppg LOT / FIT Press =674 psi
LOT / FIT =12.00 ppg Hole Depth =7810 md
Fluid Pumped=1.7 Bbls Volume Back =1.4 bbls
Estimated Pump Output:0.062 Barrels/Stroke
LOT / FIT DATA CASING TEST DATA
Enter Strokes Enter Pressure Enter Strokes Enter Pressure
Here Here Here Here
->00 ->00
->476 ->6273
->8 195 ->12 472
->12 328 ->18 631
->16 413 ->24 783
->20 518 ->30 955
->24 601 ->36 1126
->28 678 ->42 1303
-> ->48 1483
-> ->54 1665
-> ->60 1850
-> ->66 2036
-> ->74 2292
-> ->86 2673
Enter Holding Enter Holding Enter Holding Enter Holding
Time Here Pressure Here Time Here Pressure Here
->0 678 ->0 2673
->1 585 ->1 2652
->2 563 ->2 2650
->3 550 ->3 2650
->4 539 ->4 2648
->5 529 ->5 2647
->6 519 ->10 2643
->7 511 ->15 2638
->8 504 ->20 2634
->9 496 ->25 2630
->10 489 ->30 2627
-> ->
-> ->
-> ->
9 5/8" 47#/40# L-80
0
4
8
12
16
20
24
28
0
6
12
18
24
30
36
42
48
54
60
66
74
86
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
0 102030405060708090100Pressure (psi)Strokes (# of)
LOT / FIT DATA CASING TEST DATA
678
585563550539529519511504496489
267326522650265026482647 2643 2638 2634 2630 2627
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
0 5 10 15 20 25 30Pressure (psi)Time (Minutes)
LOT / FIT DATA CASING TEST DATA
Activity Date Ops Summary
4/4/2022 Blow down steam, air, water. R/D interconnects. clean pits. Scope derrick down. Raise modules. Split modules apart and stage on pad for mob. Walk sub base off
V-227Aand rotate. Install back tires. R/U yoke on sub and hook up to truck. Stage on pad. Move all modules from 'V' pad to 'M' pad and stage on pad. Set rig mats.
Spot sub base over M-201. Shim and level sub base. Set and level catwalk.
4/5/2022 Lay rig mats. Attempt to spot mud mod and pipe shed. Difficulties on pipe shed side due to limited space on pad. Finish spotting pipe shed. Spot mud mod, and gen
mod. Verify interconnects will work. Release NES trucks at 17:30. Rig up interconnects. Assist electrician with electrical inter connect. Swap to generators. Apply
steam to rig. Lower all stairs. Scope derrick up. Install derrick pins, rig up weight buckets and Geronimo line. Plug in derrick lines. Bridle down. Remove MPD head
and set in cellar. Install bell nipple. Set BOP Stack on diverter 'T'. Install bolts and torque orient 'T' for vent line. Install knife valve and accumulator lines. Install
diverter vent sections. Wire wheel shaker motor mounts. Take links out of drag chain. Install 4" conductor valves. C/O UPR's to 4.5" x7" VBR's. Tighten chain
binders. Install trip nipple and air up boots. Work on rig acceptance checklist.
4/6/2022 Cont. working on rig acceptance checklist. C/O saver sub, bell guide and block dies to 5". Pump through and inspect both mud pumps. Mount and torque shaker
motors. Install mousehole. Obtain RKB's. Continue loading and strapping drill pipe in shed. Cont working on rig acceptance checklist. Assist welder with bolt on
suction pod pump 1, crack in shaker 2 bed an adjustment holes on shaker 2. Pressurize accumulator and adjust bag pressure for mousehole. Rig accepted at
15:30. Drift, pick up and rack back 260 joints HWDP, 14 joints of HWDP. Sim Ops: test gas alarms, take on spud mud. Assist welder with beyond flowline deflection
extension, cellar door latch Pick up 3 stands of HWDP and jars. L/D mouse hole from rotary. Total 130 stands DP and 9 stands HWDP with jars. String on new
drilling line. Set slips and dog collar on drill pipe. Remove secondary crown save from dead line, remove wraps from deadman. M/U snake as per procedure. Start
re-stringing the blocks and draw works. Slipping on 1,305' of drillling line.
4/7/2022 Finish torqueing deadman brass and main support bolts. Unhang blocks and calibrate first layer on drum. Check crown and floor saver. Service rig: grease TD,
blocks, crown, spinners, check gear oil on TD and rotary. P/U bit, XO, lift subs. Prep to pick up BHA. R/U tongs and cat head. M/U cleanout BHA: 12-1/4 Kymera
bit, motor. RIH on HWDP to 106'. Pick up off bottom Perform Diverter test: knife valve open in 6 seconds, annular close in 10 seconds. Accumulator draw down test:
starting pressure 3000 psi, pressure after closure 1900 psi, first 200 psi recharge 19 seconds, full recharge 52 seconds. (6) N2 bottles at 2367 psi. RIH to 106'. Drill
rathole from 106' to 220' at 300 gpm, 1150 psi, 30 rpms, 1250ft-lbs, WOB 2K. P/U 42K, S/O 42K, ROTW 40K. Jet flow line and pump down bleeder as needed.
POOH racking back 3 stands HWDP. Inspect bit - good. P/U 40K, S/O 40K. Cont. M/U BHA: GWD, DM, WER-M5, TM collar. Measure RFO=136.39°. Plug in and
upload MWD. P/U and M/U (2) flex collars to 159'. Wash and ream with HWDP to 220' at 300 gpm, 30 rpms. Cont. drilling 12-1/4" hole from 220' to 351' at 425
gpm, 600 psi, 30 rpms 1.5-3Kft-lbs, WOB 5-10K. P/U 55K, S/O 55K, ROT 55K. Continuously jetting flow line, pump through bleeder as needed. 50-120 bph loss
rate Observe erratic pump pressure, then no pump pressure as troubleshooting. KOP 283'. Observe small pea gravel to large gravel over shakers. Observe losses
up to 125 bph. POOH from 351' to 90' (inside conductor) while going through pumps. Observe fine pea gravel and sand in both pumps all valve and seats, suctions
and discharges. Clean out mud pumps. RIH to 339' with no issues. Wash down to 351' and continue slide drilling from 351' to 403 ' at 425 gpm, 670 psi, WOB 5-
10K. P/U 55K, S/O 55K, ROT 55K. Rack stand back and pick up jar stand. RIH and set down at 490'. Screw in and establish circulation. Observe 450-500 psi high
pump pressure. Troubleshoot, appears jet nozzle plugged. DD ran hydraulics and shows potential of two plugged nozzles. Attempt to unplug bringing pumps up to
550 gpm/1800 psi and surging pumps. Loss rate while circulating ~60 bph, drilling ~125 bph. POOH from 403', racking back HWDP, DC, and MWD. Break out bit.
Observe two nozzles plugged, all three cones jammed with gravel, two cutters with 1/3-1/2 broken, one cone dragged. 1-2-BT-N-E-I-PN-PP. M/U new bit to motor.
RIH with MWD tools from derrick. Measure RFO 135.46°. RIH with flex collars, HWDP and Jars to 370'. Wash down from 370' to 403' at 400 gpm, 625 psi, 30 rpms
1300 ft-lbs. Cont. drilling 12-1/4" hole from 403' to 413' at 400 gpm, 625 psi. Drag chain packed off and chain fell off the gear. Rack back one stand. Use
supersucker to clear out drag chain. reconnect chain to gear. Cont. drilling 12-1/4" hole from 413' to 525' (total=112', AROP 75 fph) at 425 gpm, 705 psi, WOB 5-
10K. 100% sliding. ECD 9.75 ppg w/ 8.95 ppg mud. P/U 62K, S/O 62K, ROT 58K. Continuously jetting flow line, pump down bleeder as needed. Observe loss rate
decrease down to 10-15 bph, observe clay sand and some gravel over the shakers. Daily disposal to G&I: 228 bbls, total=228 bbls. Daily H2O from Lake 2: 450
bbls, total 1130 bbls. Daily losses 505 bbls, total 505 bbls. Distance to WP09: 0.22', 0.13' high, 0.18' left.
4/8/2022 Cont. drilling 12-1/4" hole from 525' to 1034' (total=509', AROP 85 fph) at 450 gpm, 1050 psi, 40 rpms, 3-4Kft-lbs, WOB 5-10K. ECD 9.5 ppg w/ 8.9ppg mud. P/U
62K, S/O 62K, ROT 58K. Jetting and pumping down flow line as needed. Last GWD survey 918'. Cont. drilling 12-1/4" hole from 1034' to 1480' (total=446', AROP
75 fph) at 450 gpm, 1070 psi, 60 rpms, 5-6Kft-lbs, WOB 5-10K. ECD 9.82 ppg w/ 9.1ppg mud. Max Gas 21u. P/U 79K, S/O 77K, ROT 76K. Jetting and pumping
down flow line as needed. Cont. drilling 12-1/4" hole from 1480' to 1859' (total=379', AROP 63 fph) at 450 gpm, 1421 psi, 60 rpms, 6-7Kft-lbs, WOB 5-20K. ECD
9.97 ppg w/ 9.35ppg mud. Max gas 20u. P/U 92K, S/O 74K, ROT 76K. Jetting and pumping down flow line as needed. Start backreaming full stands. Cont.
drilling 12-1/4" hole from 1859' to 2560' (total=701', AROP 117 fph) at 500 gpm, 1455 psi, 80 rpms, 6Kft-lbs, WOB 5-8K. ECD 10.1 ppg w/ 9.5ppg mud. Max gas
21u. P/U 98K, S/O 74K, ROT 86K. Jetting and pumping down flow line as needed. Backream full stands. Base of permafrost logged at 2164'. Daily disposal to G&I:
798 bbls, total= 1026 bbls. Daily H2O from Lake 2: 580 bbls, total 1610 bbls. Daily losses 230 bbls, total 735 bbls. Distance to WP09: 47.34', 46.93' Low, 6.21'
Right.
4/9/2022 Cont. drilling 12-1/4" hole from 2560' to 3196' (total=636', AROP 106 fph) 500 gpm, 1430 psi, 80 rpms, 7Kft-lbs, WOB 3-8K. ECD 10.3 ppg w/ 9.5ppg mud. Max
gas 45u. P/U 114K, S/O 78K, ROT 89K. Backream full stands. At 2805' shakers unloaded with thick mud/cuttings. Reduce flow to 400 gpm and CBUx2 Cont.
drilling 12-1/4" hole from 3196' to 3770' (total=574', AROP 96 fph) at 500 gpm, 1451 psi, 80 rpms, 7-11Kft-lbs, WOB 6-12K. ECD 10.3 ppg w/ 9.5ppg mud. P/U
120K, S/O 77K, ROT 94K. Jetting and pumping down flow line as needed. Backream full stands. Cont. drilling 12-1/4" hole from 3770' to 4276' (total=506', AROP
84 fph) at 500 gpm, 1550 psi, 80 rpms, 7-11Kft-lbs, WOB 6-12K. ECD 10.3 ppg w/ 9.55ppg mud. Max gas 141u. P/U 132K, S/O 78K, ROT 103. Jetting and
pumping down flow line as needed. Backream full stands. Cont. drilling 12-1/4" hole from 4276' to 4861' (total=585', AROP 98 fph) at 500 gpm, 1660 psi, 80 rpms,
10-11Kft-lbs, WOB 3-8K. ECD 10.24 ppg w/ 9.55ppg mud. Max gas 230u. P/U 139K, S/O 86K, ROT 105. Jetting and pumping down flow line as needed.
Backream full stands. Daily disposal to G&I: 1083 bbls, total= 2109 bbls. Daily H2O from Lake 2: 1160 bbls, total 2770 bbls. Daily losses 0 bbls, total 735 bbls.
Distance to WP09: 16.09', 15.58' high, 3.99' right.
50-029-23711-00-00API #:
Well Name:
Field:
County/State:
PBW M-201
Prudhoe Bay West
Hilcorp Energy Company Composite Report
, Alaska
4/7/2022Spud Date:
4/10/2022 Cont. drilling 12-1/4" hole from 4861' to 5293' (total=432', AROP 72 fph) at 500 gpm, 1530 psi, 80 rpms, 12-13Kft-lbs, WOB 3-8K. ECD 10.24 ppg w/ 9.55ppg
mud. Max gas 942u. P/U 174K, S/O 98K, ROT 115. Jetting and pumping down flow line as needed. Backream full stands. At 5105' observe oil at shakers, blinding
them off. Reduce flow to 400 gpm and screen down to 120's. Cont. drilling 12-1/4" hole from 5293' to 5740' (total=447', AROP 75 fph) at 400 gpm, 1350 psi, 80
rpms, 14-16Kft-lbs, WOB 4-13K. ECD 10.32 ppg w/ 9.55ppg mud. Max gas 523u. P/U 169K, S/O 86K, ROT 110. Jetting and pumping down flow line as needed.
Backream full stands. Cont. drilling 12-1/4" hole from 5740' to 6120' (total=380', AROP 64 fph) at 400-500 gpm, 1457 psi, 80 rpms, 16-20Kft-lbs, WOB 5-12K.
ECD 10.38 ppg w/ 9.55ppg mud. Max gas 531u. P/U 176K, S/O 89K, ROT 119K. Jetting and pumping down flow line as needed. Backream full stands. Cont.
drilling 12-1/4" hole from 6120' to 6498' (total=378', AROP 63 fph) at 550 gpm, 2250 psi, 80 rpms, 16-20Kft-lbs, WOB 12-20K. ECD 10.84 ppg w/ 9.55ppg mud.
Max gas 382u. P/U 188K, S/O 90K, ROT 122K. Jetting and pumping down flow line as needed. Backream full stands. Daily disposal to G&I: 1140 bbls, total= 3249
bbls. Daily H2O from Lake 2: 830 bbls, total 3600 bbls. Daily losses 0 bbls, total 735 bbls. Distance to WP09: 12.95', 11.3' high, 6.33' right.
4/11/2022 Cont. drilling 12-1/4" hole from 6498' to 6946' (total=448', AROP 75 fph) at 550 gpm, 2105 psi, 80 rpms, 19-20Kft-lbs, WOB 12-20K. ECD 10.24 ppg w/ 9.6ppg
mud. Max gas 412u. P/U 202K, S/O 91K, ROT 130K. Jetting and pumping down flow line as needed. Backream full stands. Cont. drilling 12-1/4" hole from 6946'
to 7073' (total=127', AROP 64 fph) at 550 gpm, 2250 psi, 60-80 rpms, 19-22Kft-lbs, WOB 12-20K. ECD 10.32 ppg w/ 9.55ppg mud. Max gas 577u. P/U 208K,
S/O 92K, ROT 132K. Slide as needed for 4°/100' build. Backream full stands. Service rig: troubleshoot loss of draw works power. Change out DSU inverter in sub
drive house. Circulate at 250-350 gpm, 908 psi. Cont. drilling 12-1/4" hole from 7073' to 7391' (total=318', AROP 40 fph) at 550 gpm, 2150 psi, 80 rpms, 19-20Kft-
lbs, WOB 12-17K. ECD 10.12 ppg w/ 9.5ppg mud. Max gas 419u. P/U 209K, S/O 92K, ROT 134K. Slide as needed for 4°/100' build. Backream full stands.
Cont. drilling 12-1/4" hole from 7391' to 7691' (total=300', AROP 50 fph) at 525 gpm, 2055 psi, 80 rpms, 19-20Kft-lbs, WOB 5-20K. ECD 10.1 ppg w/ 9.5ppg
mud. Max gas 130u. P/U 216K, S/O 88K, ROT 128K. Slide as needed for 4°/100' build. Backream full stands. Daily disposal to G&I: 1321 bbls, total= 4570 bbls.
Daily H2O from Lake 2: 1160 bbls, total 4760 bbls. Daily losses 49 bbls, total 784 bbls. Distance to WP09: 13', 12.76' high, 2.86' right.
4/12/2022 Cont. drilling 12-1/4" hole from 7691' to casing point at 7790' (total=99', AROP 50 fph) at 550 gpm, 2135 psi, 80 rpms, 19-21Kft-lbs, WOB 8-12K. ECD 10.2 ppg w/
9.5ppg mud. Max gas 576u. P/U 216K, S/O 88K, ROT 128K. Slide as needed for 4°/100' build. Backream full stands. Obtain final survey. BROOH from 7790' to
7647'. Pump high vis sweep (on time, 10% increase) around plus two bottoms up at 550 gpm, 2010psi, 60 rpms, 19-21Kft-lbs, reciprocating pipe. Rack stand
back ever bottoms up. Max gas 593u, ECD 10.2 ppg. P/U 201K, S/O 88K, ROTW 127K RIH on elevators to 7790', no issues. L/D single. Downlink to put GWD in
out-run mode. BROOH from 7790' to 7620' at 550 gpm, 1970 psi, 80 rpms, 20Kft-lbs, ECD 9.96 ppg with 9.5 ppg mud. P/U 198K, S/O 85K, ROT 125K. Cont. to
BROOH from 7620' to 5100' at 520 gpm, 1600 psi, 60 rpms, 14-16Kft-lbs, ECD 10.2 ppg with 9.5 ppg mud. Max gas 256u. P/U 175K, S/O 92K, ROT 111K.
Pulling 15-30 fpm as hole dictates. Cont. to BROOH from 5100' to 2850' at 545 gpm, 1470 psi, 80 rpms, 8-13Kft-lbs, ECD 10.08 ppg with 9.5 ppg mud. Max Gas
117u. P/U 115K, S/O 75K, ROT 85K. Pulling 15-30 fpm as hole dictates. Slight packoffs and erratic tq from 4430'-4410', 3511'-3590' Cont BROOH from 2850' to
1010' at 545 gpm, 1190 psi, 80 rpms, 3-4Kft-lbs, ECD 9.8 ppg, max gas 48u. P/U 91K, S/O 64K, ROT 72K. Pull 2-25fpm as hole dictates. Slow pulling speed 2
stands prior to permafrost and obtain 2 x BU. Slow pulling speed from 2050' - 1770' due to erratic TQ. At 1290' observe ECD's climb to 10.77 ppg and shakers
begin to unload with sand and clay. Reduce pulling speed to 2 fpm. Observe shakers clean up after 2.5x bottoms up and ECD's drop to 9.8 ppg. Daily disposal to
G&I: 979 bbls, total= 5549 bbls. Daily H2O from Lake 2: 1160 bbls, total 5920 bbls. Daily losses 120 bbls, total 904 bbls. Distance to WP09: 0.87', 0.15' low, 0.86'
right.
4/13/2022 BROOH from 1010' to 719' MD, GPM 475, PSI 930, RPM 80, TQ 3K, ECD 9.5, Max Gas 45u, P/U 80K, SO65K, Rot 68K. Pull 2-25 fpm as hole dictates. See hole
unload @ 955 to 800' pulling 2 fpm until clean. Lost 21 bbls during Back reaming. TOOH on elevators from 719' to 161' racking back 9 stds HWDP and Jars. P/U
74K, SO 64K PJSM, L/D BHA, Break and L/D Bit and Mtr. Bit graded 3-4-BT-A-X-2-CT-TD. Clean and Clear Rig Floor. PJSM, Stage and rig up 9 5/8" Casing
running equipment. Verify pipe count to Tally. Blow down CMT Line and finish casing running check list. Static loss rate @ 1 bph. PJSM P/U M/U 9.625" Shoe
Track 125.91', BakerLoc and check floats, good. Drop ByPass plug as per HES rep onsite. Cont. RIH W/ 9.625" L-80 40# TXP BTC to 1,752' MD. Encountered
tight spot at 1,732' MD work through W/ 5 bpm 150 psi 8-9 rpm Trq stall set 14k using string weight. P/U 82k SLK 65k ROT80k. Lost 14 bbls. Max Gas 64u. Trq
TXP BTC 21k. Fill every 5 jnts, break Circ every 15 jnts. Cont working tight spots F/ 1,752’ to 1,806’ MD parameters 5 bpm 150 psi 8 rpm Trq stall set at 15k.
Encountering dynamic losses 20-30 bph Observed sand & clay with slight gravel and wood at shakers. Cont RIH working intermittent tight spots F/ 1,806’ to 2,143’
MD same parameters. Run speed 10-30 fpm. P/U 106k SLK 75k ROT 84k. Max Gas 22u. Lost 86 bbls. Fill every 5 jnts, break Circ every 15 jnts. CBU Rot Rec F/
2,143’ to 2,223’ MD. Stage pumps up to 6 bpm 125 psi 8 rpm Trq 11-15k Max Gas 21u. P/U 122k SLK 74k ROT 81k. Dynamic loss rate 9 bph. Cont RIH working
intermittent tight spots F/ 2,223’ to 2,998’ MD. 5 bpm 150 psi 8 rpm Trq stall 15k. Trq TXP BTC 21k. Run speed 10-40 fpm. P/U 150k SLK 72k ROT 72k. Max Gas
21u. Lost 12 bbls. Cont RIH working intermittent tight spots F/ 2,998’ to 3,812’ MD. 5 bpm 150 psi 8 rpm Trq stall 15k. Trq TXP BTC 21k. Run speed as hole
dictates. RIH on elevators F/ 3,812’ to 4,551’ MD. Run speed 35-40 fpm. P/U 210k SLK 96k ROT 86k. Max Gas 18u. Lost 16.5 bbls. Fill every 5 jnts, break Circ 15
jnts CBU over 3 jnts F 4,551’ to 4,670’ MD. Stage up to 6 bpm 200 PSI F/O 34% P/U 218k SLK 100k Max Gas 18u. Dynamic loss rate 7-8 bph. Cont. RIH W/
9.625" L-80 40# TXP BTC on elevators F/ 4,670’ to 5,200’ MD. Run speed 35-40 fpm. P/U 265k SLK 95k. Max Gas 16u. Lost 4 bbls. Trq TXP BTC 21k. Fill every 5
jnts, break Circ every 15 jnts. Daily disposal to G&I: 661 bbls, total= 6210 bbls. Daily H2O from Lake 2: 410 bbls, total 6330 bbls. Daily losses 160 bbls, total 1064
bbls. Distance to WP09: 0.87', 0.15' low, 0.86' right.
Cont. drilling 12-1/4" hole from 7691' to casing point at 7790' (
4/14/2022 Continue RIH on elevators w/ 9 5/8", L-80, 40# TXP BTC from 5200' to 5402' TQ BTC t 21K, Run Speed 35-40 fpm, P/U 300K, SO 99K, Max Gas 16u, lost 11
bbls, fill every 5 jts and break circulation back to pits every 15 jts. MU ESCMTR after Jt 133. RIH with 47# Vam Top Csg f/5404 to 6505'. Tq to 31K. RIH while CBU
over 3 jts from 6505' to 6700'(End of Tangent Section) staging pumps to 6 BPM/290 PSI, 7 BPH dynamic loss rate. Continue RIH on elevators w/ 9 5/8", L-80, 47#
Vam Top Csg from 6700' to 7026' TQ BTC t 31K, Run Speed 35-40 fpm, P/U N/A, SO 118K, lost 3.5 bbls, fill every 5 jts and break circulation back to pits every 15
jts. Continue RIH on elevators w/ 9 5/8", L-80, 47# Vam Top Csg from 6700' to 7780' TQ BTC t 31K, Run Speed 10-25 fpm, P/U N/A, SO 112K, lost 24.2 bbls, fill
every 5 jts and break circulation back to pits every 15 jts. Wash last 2 jts to bottom. @ 7780' MD Stage pump to 6BPM/320 PSI, attempt to Rot pipe w/ TQ Limiter
set @ 18K, no Rotation. Attempt to Recip pipe with 380K P/U and no break over. Circulate and condition mud for cement job. No losses while circulating. Blow
Down Top Drive and R/U Cement line to Volant. Contiune to circulate through the cement line while prepping pits and R/U Cementers. PJSM, Wet lines w/ 5 bbls
H2O (HES) and P/T low kick out 1,130/ 4,601 psi high. Pump 1st stage cement job as follows: 60 bbls 10 ppg Tuned spacer w/ 4# red dye & 5 ppb poly flake (1st
10 bbls). Release F/ Volant & drop bypass plug. HES pump Lead Type I/II cmt 321 bbls (769 sx) 12 ppg, 2.347 yld, 4.5 bpm, ICP 380 psi FCP 277 PSI. Tail Type
I/II cmt (Wet at 20:28) 87 bbls (400 sx)15.8 ppg, 1.156 yld, 3.45 bpm, ICP 367 psi FCP 502 PSI. Release F/ Volant & drop shutoff plug. Displace w/ 20 bbls H2O
(HES) 5.7 bpm 380 PSI then turn over to rig. Rig disp w/ 371.7 bbls 9.5 ppg spud mud, 6 bpm ICP 259psi FCP 545 psi. HES disp 72 bbls 9.4 ppg tuned spacer,
4.5 bpm ICP 590 psi FCP 639 psi. Rig disp 114.3 bbls (111.4 bbls Calc) 9.5# spud mud 4 bpm, ICP 754 psi FCP 1,093 psi. Reduced rate last 10 bbls to 3 bpm,
FCP 1,080 PSI. Bump plug Press up to 1,630 psi. Held pressure for 5 minutes, check floats - good. CIP 00:25 hrs. Full returns throughout job. Pump at 3 bpm
Press up to 2,730 psi ES cementer opened slowly and Press bled down to 1,000 PSI. Increase pumps to 4 bpm ICP 1,395 FCP 410 psi after 2 BU. Increased pump
rate to 5 bpm 540 psi.. At ~500 STKS (31 bbls) away saw clabbered up mud, started dumping at 3,700 stks (229 bbls) of contaminated cement. Dumped a total of
403 bbls W/ 102 bbls contaminated cement at surface. After 5 BU shut down and flush stack W/ Black Water. Disconnect knife valve and function Annular multiple
times. Re Connect knife valve. SIMOPS Clean suction screen MP #1. Haul off dumped mud and prep for 2nd stage. Stage pumps up 5 bpm 495 psi CBU total 4X.
SIMOPS Prep pits and truck for 2nd stage cement job. Daily disposal to G&I: 114 bbls, total= 6324 bbls. Daily H2O from Lake 2: 960 bbls, total 7290 bbls. Daily
losses 69 bbls, total 1133 bbls.
4/15/2022 Continue to circulate through stage tool @ 2355', while WOC and prepping for 2nd stage cement. 6 BPM/530 PSI. PJSM, Pump 2nd stage cmt job. Lineup to cmtrs,
wet lines w/ 5 bbls FW. Mix/Pump 60 bbls 10# Tuned Spacer III w/ 4# red dye first 10 bbls, 3.5 BPM, 230 psi. Mix and pump 461 sxs (280 bbls)( 2.883 yld)
ArcticCem Lead Cement at 10.7 ppg. Pump Lead until seen @ Surface. See Spacer @ 210 bbls into Lead. See Green Cmt 235 bbls into Lead. (Calculated STS
volume =328 bbls). Go into Tail CMT. Mix and pump 267 sxs (56.5 bbls)(1.169 yld) Type I/II Tail Cement at 15.8 ppg. Drop closing plug. Displace cmt w/ 20 bbls
FW f/ Cmt Unit. Rig 150 bbls (152.8 calculated)(2 bbls under) 9.5ppg mud, 6bpm/ 975psi, FCP 563 psi @ 3 bpm last 15 bbls. Bumped and psi up to 1880 psi (ES
shift @ 1570 psi) Held 5 min. CIP @ 12:15. Full Returns through out job. Circulated 212 bbls of Green CMT to surface. Drain Stack, Flush stack with black water
cycle bag x3, R/D CMT line and Volant, N/D Diverter sections, Loosen speed head and suspend stack. Set 9.625" emergency slips W/ 40k as per Vault rep onsite.
Cut 9.625" Csg (29.39') Cut 9.625" Csg (29.39'). Reland Stack and Johnny whack stack and jet flowline with black water. Blow Down all Surface Equipment.
Continue to N/D Diverter components. Set Stack Back, remove Diverter Tee, and adapt and set aside in Cellar. Welder Dress Csg Stub. Simops: Clean pits, suction
manifold, and screen on both pumps. PJSM Install RCD studs on top of Annular. P/U RCD and suspend W/ tugger. P/U BOP and move off pedestal. Install RCD to
Annular. Unhook tugger and set BOP beck on pedestal. PJSM P/U wellhead and install on 9.625" csg. Set test plug. Vault rep energize seals and test 500 psi 5
min, 3,800 psi 10 min, good. PJSM Install DSA and BOP on wellhead. Secure chains and buckle's. Install drip pan, choke & kill lines. Install 4" MPD hard lines. M/U
test sub to TD, flood MPD lines. Test MPD 250/ 1,250 psi good. SIMOPS Cont cleaning pits, Derrick inspection. Obtain RKB. PJSM Break in UPR's VBR's (4.5" X
7") W/ 4.5" & 7" test jnts as per procedure. P/U M/U 5" test jnt M/U pump in sub, 5" TIW #1 and 5" Dart Valve Flood and purge air F/ manifold and lines. Shell test
to 3,000 psi, good. PJSM Test UPR’s (4.5” X 7”) W/ 7” test jnt 250/ 3000 psi 5 min. Cont BOPE test W/ 5" to 250 PSI low and 3,000 PSI high for 5 Min. Tested
Choke Manifold 1-15, 5" Dart, 1 ea 5" TIW, Upper and lower IBOP, Mez Kill, HCR (F/P) and manual Kill, Super Choke (F/P) and manual to 1,600 PSI, Upper and
lower VRB Rams (2.875" X 5.5"). Witnessed waived by AOGCC Rep Guy Cook. Daily disposal to G&I: 2101 bbls, total= 8425 bbls. Daily H2O from Lake 2: 550
bbls, total 7840 bbls. Daily losses 0 bbls. Surface loss total 1133 bbls.
4/16/2022 Continue Testing BOPE. Witness waived by Guy Cook. Test to 250/3000 psi 5 min ea. Test on 4 1/2", 5", and 7" pipe size. Test Gas Alarms. Perform Draw Down:
Start 3050 psi, After close: 1500 Psi, 200 psi build: 25 sec, Full recovery: 93 sec. N2: 6 @ 2366 psi Ave. PJSM, Pull test plug. L/D test jt. Blow down choke and kill
line. Clean and clear rig floor. Install 9" ID Wear Bushing. PJSM, Stage all BHA components on rig floor for Clean out run. Service Rig. Inspect welds on Top Drive
Cradle and found a 1.5" crack starting on upper DS of Cradle. P/U 8.5" Bit, XR-CPS (TFA 0.9419) 1.5° StrataForce Lobe 6.7- 6 stg Motor and HWDP w/ SLB Jars
(Hydra) to 589' PU and single in hole with 5" DP from 589' to 1720' MD. Drift w/3.125" PUW 69K, SOW 60K Continue to PU and single in hole with 5" DP from
1720' to 2300'' MD. Drift w/3.125" PUW 88K, SOW 64K M/U Top Drive, fill pipe, Wash down from 2300' and Tag Top of ESCMTR @ 2356'. Drill ESCMTR, 450
GPM/730 PSi, 30 RPM, 6K TQ, 5-7 WOB. PUW 88, SOW 64K, Rot 76K. Pas through with and without pumps. Cont single in hole W/ 5" 19.5# S-135 NC-50 F/
2,370' to 5,039' MD. Total 140 jnts. Drift 3.125" OD. P/U 165k SLK 68k. PJSM Fill string. Cont RIH F/ Derrick 5" D.P. F/ 5,039' to 7,391l MD. Wash down to 7,645'
MD. P/U 225k SLK 82k. Encountered cement stringers at 7,395'. Cont wash and ream F/ 7,391' to 7,642' MD 450 gpm 780 psi 5-30 rpm Trq stall set at 18k. Circ
surf to surf. Rot Rec F/ 7,642' to 7,581' MD. Dumped clabber mud and cured cement at BU. Adjusting flow rates due to drag chain. 450 gpm 780 psi 10-30 rpm Trq
stall set at 21.5k due to high trq stalls. P/U 213k SLK 82k ROT 130k. Adding lube due to Trq. PJSM M/U TIW, headpin and 1502's. R/U test Equip. Circ through
mud cross and purge out air. Shut UPR. Press up and found sacrificial Mezz kill valve leaking at ~300 psi. Inspect & grease valve body. Test 9.625" Csg to 2,500
psi for 30 min, good. Pump 4.6 bbl, bled 4.5 bbl. R/D test Equip. PJSM Drill F/ 7,642' to 7,680' MD. Tag BFA on depth at 7,657' MD. Encountering high Trq stall
and bit stall W/ Trq limiter set at 22.4k. Adjusted parameters and added a total of 4 drum of lube. Trq smoothing out while drill shoe track. 400 gpm 890 psi 30 rpm
Trq 19-22k. Saw shut off rubber at surface. Good cement. Cont drill shoe track and 20' of new hole F/ 7,680" to 7,810' MD. FC (7,696') & shoe (7,781') on depth.
400 gpm 1,220 psi 30 rpm Trq 15k WOB 3-9k P/U 177k SLK 84k ROT 128k. Begin displacing 9.5 ppg Spud Mud W/ 9.5 ppg BaraDril N during during rat hole.
Work through shoe multiple times, no issue. Cont Displacing to 9.5 ppg BaraDil N 4% Lubes 450 gpm 850 psi 30 rpm Trq 14k P/U 198k SLK 94k ROT 125k. SPR.
PJSM Shut UPR and purge air through manifold and lines. Perform FIT 12 EMW W/ 9.5 ppg MW 7,781' MD 5,178' TVD 674 psi. Pump 1.7 bbl bled 1.4 bbl. Blow
down lines. Monitor well 10 min static. Send 9.625" Csg & FIT digital copy to AOGCC for approval to drill ahead. PJSM POOH rack 5" D.P. F/ 7,781' to 7,509' MD
ensure not swabbing. Pump dry job. Blow down. Cont POOH rack 5" D.P. F/ 7,509' to 4,495' MD. P/U 142k SLK 87k. No losses. Daily disposal to G&I: 513 bbls,
total= 8938 bbls. Daily H2O from Lake 2: 200 bbls, total 8040 bbls. Daily losses 0 bbls. Surface loss total 1133 bbls.
. Wash last 2 jts to bottom. @ 7780' MD
Test 9.625" Csg to 2,500
psi for 30 min, good.
Perform FIT 12 EMW W/ 9.5 ppg
4/17/2022 Cont POOH F/ 4,495' to 589' MD. P/U 60k SLK 60k. No losses. PJSM Rack back 5" HWDP & jar. L/D 14 jnts 5" HWDP. L/D 1.5° Motor and 8.5" Bit. Bit Grade 1-1-
WT-A-E-I-N-BHA. Clean and clear rig floor. PJSM P/U X/O's, subs and components for BHA. Prep rig floor for making up BHA. PJSM P/U M/U 8.5" Hycalog TK 66
PDC (TFA 0.7777), 8.5" Hycalog NRP, 7600 GeoPilot 25KSI, 6.75" ADR, 8.375" ILS, 6.75" DGR, 6.75" PWD, 6.75" DM, 6.75" ALD, 6.75" CTN, 6.75" TM HOC &
8.375" ILS. . Plug in and download MWD. Cont M/U 6.75" NM FS (Non Ported/ Plunger) 6.75" NM FC, 6.75" NM FS (Non Ported/ Plunger), 6.75" NM FC, 2ea 5"
HWDP, 6.5" SLB Hydra Jar & 1 ea 5" HWDP. Total length 310.84'. PJSM Grease crown sheave, blocks, top drive & iron roughneck. PJSM Single in hole BHA 4
W/ 5" 19.5# S-135 NC50 (234 jnts) F310' to 7,743' MD. Drift 3.125" OD. Follow break in procedure for new D.P. At 2,654' MD break in GeoPilot and pulse test
MWD at 450 gpm 995 psi. Blow down TD. P/U 154k SLK 94k. PJSM Install RCD bearing as per Beyond rep onsite. Loosen grey clamp. Pull trip nipple. Drain
stack. Install penetrating cone and install RCD bearing on stand. Adjust BOP to ODS and tighten turnbuckles. Set RCD bearing and tighten grey clamp. Check for
leaks, good. 400 gpm 1,150 psi. PJSM Cut and slip drilling line. ACCUM TM 899. Cut 11 wraps (69') 3,629' left on spool. Install guard and Trq deadman. Set TD
limits. Grease drawworks spline EAM and check brake gap, good. PJSM Service rig. Grease crown, blocks, TD, spinners, iron roughneck & stand pipe manifold.
Perform EAM crown and block wobble, good. Open coffin on TD clean up residual oil and found 2 loose Hydraulic hoses, tighten. Unhang blocks. Wash down F/
7,743' to 7,804' MD 400 gpm/ mpd 392, 1,090 psi, 40 rpm, TRQ 11-12k,ECD 10.18. P/U 158l SLK 97k ROT 128k. Send down links prior to exiting shoe to
calibrate MWD depth. No issue going through shoe. SPR's. Drill 8.5" Hole F/7,820 to 7,997' MD (5,173' TVD) Total 177' (AROP 70.8’) 500 gpm/ mpd 489, 1,660
psi, 100 rpm, TRQ on 15-17k, TRQ off 15-16k, wob 5-7k. ECD 10.47 Max Gas 41u. P/U 180k, SLK 90k, ROT 120k. MPD 100%. Back ream 60'. Distance to
WP09: 1.51’, 1.45’ Low 0.4’ Left. Daily disposal to G&I: 882 bbls, total= 9820 bbls. Daily H2O from Lake 2: 270 bbls, total 8310 bbls. Daily losses 0 bbls. Surface
loss total 1133 bbls.
4/18/2022 Drill 8.5" Hole F/7,997 to 8,567' MD (5,158' TVD) Total 570' (AROP 95’) 500 gpm/ mpd 488, 1,745 psi, 100 rpm, TRQ on 16-17k, TRQ off 15-16k, wob 6-10k. ECD
10.6 Max Gas 115u. P/U 178k, SLK 78k, ROT 120k. MPD 100%. Back ream 60'. Drill 8.5" Hole F/8,567 to 9139' MD (5160' TVD) Total 572' (AROP 95.3’) 500
gpm/ mpd 492, 1,890 psi, 120 rpm, TRQ on 17.5k, TRQ off 16-18k, wob 3-10k. ECD 10.95, MW in/out 9.4+/9.5, Max Gas 843u. P/U 177k, SLK 74k, ROT 118k.
MPD Hold 140 psi Drilling/100 connections. Back ream 60'. Drill 8.5" Hole F/9,139' to 9,809' MD (5,181' TVD) Total 670' (AROP 111.6') 500 gpm/ mpd 490, 1,930
psi, 120 rpm, TRQ on 19.5k, TRQ off 16-18k, wob 7-9k. ECD 11.05, MW in/out 9.5/9.55, Max Gas 921u. P/U 178k, SLK 72k, ROT 118k. MPD Hold 140 psi
dynamic/80 psi static. Back ream 60'. Using MPD to control gas at shakers. Drill 8.5" Hole F/9,809' to 10,410' MD (5,190' TVD) Total 601' (AROP 100.2') 500 gpm/
mpd 490, 2,050 psi, 120 rpm, TRQ on 20-21k, TRQ off 18-19k, wob 5-9k. ECD 11.14, MW in/out 9.5, Max Gas 758u. P/U 176k, SLK 72k, ROT 115k. MPD Hold
140 psi dynamic/80-100 psi static. Back ream 60'. Distance to WP09: 17.16’, 16.60’ Low 4.36’ Left 20 concretions for a total thickness of 72' ( 2.8% of the lateral).
Footage Oba Sand 2,467'. Daily disposal to G&I: 510 bbls, total= 10330 bbls. Daily H2O from Lake 2: 680 bbls, total 8990 bbls. Daily Metal: 2 Total 2. Daily losses
0 bbls. Surface loss total 1133 bbls.
4/19/2022 Drill 8.5" Hole F/10,410' to 10,983' MD (5,188' TVD) Total 573' (AROP 95.5') 500 gpm/ mpd 490, 2,120 psi, 120 rpm, TRQ on 17-18k, TRQ off 17-18k, wob 5-10k.
ECD 11.12, MW in/out 9.5, Max Gas 581u. P/U 167k, SLK 77k, ROT 115k. MPD Hold 140 psi dynamic/80-100 psi static. Back ream 60'. Drill 8.5" Hole F/10,983'
to 11,745' MD (5,179' TVD) Total 762' (AROP 127') 500 gpm/ mpd 495, 2,170 psi, 120 rpm, TRQ on 19k, TRQ off 16k, wob 5-8k. ECD 11.21, MW in/out 9.4+, Max
Gas 869u. P/U 166k, SLK 72k, ROT 116k. MPD Hold 140 psi dynamic/80-100 psi static. Back ream 60'. Drill 8.5" Hole F/11,745' to 12,443' MD (5,184' TVD) Total
698' (AROP 116.4') 500 gpm/ mpd 499, 2,230 psi, 120 rpm, TRQ on 16-18k, TRQ off 16k, wob 8-10k. ECD 11.22, MW in/out 9.4+/9.5, Max Gas 661u. P/U 167k,
SLK 72k, ROT 116k. MPD Hold 130-140 psi dynamic/80-100 psi static. Back ream 60'. Encountered Fault #1 at 12,113' MD (11' DTS) causing exit above target
OBa-Sand into OA-Clay with minimal losses. Reentered OBa sand at 12,140' MD. Drill 8.5" Hole F/12,443' to 12,980' MD (5,165' TVD) Total 537' (AROP 89.5') 500
gpm/ mpd 487, 2,360 psi, 120 rpm, TRQ on 22-23k, TRQ off 19-20k, wob 8-10k. ECD 11.41, MW in/out 9.5, Max Gas 564u. P/U 175k, SLK 57k, ROT 111k. MPD
Hold 130-140 psi dynamic/80-100 psi static. Back ream 60'. Distance to WP09: 14.16’, 7.53’ High 11.99’ Left Fault #1 12,113' MD Throw 11' DTS. 30 concretions
for a total thickness of 107' ( 3.6% of the lateral hole section). Footage Oba Sand 4,946'. Footage out: 87'. Daily disposal to G&I: 741 bbls, total= 11071 bbls. Daily
H2O from Lake 2: 1200 bbls, total 10190 bbls. Daily Metal: 0.5 Total 2.5. Daily losses 0 bbls. Surface loss total 1133 bbls.
4/20/2022 Drill 8.5" Hole F/12,980' to 13,588' MD (5,181' TVD) Total 608' (AROP 101') 500 gpm/ mpd 487, 2,460 psi, 120 rpm, TRQ on 22-23k, TRQ off 19-20k, wob 8-10k.
ECD 11.4, MW in/out 9.5, Max Gas 649u. P/U 167k, SLK 59k, ROT 111k. MPD Hold 80-100 psi dynamic/80-100 psi static. Back ream 60'. Re-interpreted fault at
12,140' as 20' DTN, putting the wellbore in OA sands. Drill 8.5" Hole F/13,588' to 14,244' MD (5,199' TVD) Total 656' (AROP 109') 500 gpm/ mpd 486, 2,460 psi,
120 rpm, TRQ on 21k, TRQ off 18k, wob 6-9k. ECD 11.39, MW in/out 9.5, Max Gas 827u. P/U 174k, SLK 56k, ROT 114k. MPD Hold 80 psi dynamic/80 psi static.
Back ream 60'. Re-acquired Oba sands at 13,700' MD. Close approach S-41 at 13,150' MD CF .68 CC 52.14', no magnetic interference. Drill 8.5" Hole F/14,244' to
14,798' MD (5,202' TVD) Total 544' (AROP 90.7') 500 gpm/ mpd 486, 2,540 psi, 120 rpm, TRQ on 22-25k, TRQ off 22k, wob 8-10k. ECD 11.39, MW in/out 9.5,
Max Gas 786u. P/U 182k, SLK 48k, ROT 114k. MPD Hold 60 psi dynamic/85 psi static. Back ream 60'. Drill 8.5" Hole F/14,798' to 15,177' MD (5,206' TVD) Total
379' (AROP 126.4') 500 gpm/ mpd 484, 2,625 psi, 120 rpm, TRQ on 22-25k, TRQ off 22-23k, wob 6-10k. ECD 11.55, MW in/out 9.5, Max Gas 758u. P/U 167k,
SLK 35k, ROT 111k. MPD 100% dynamic/80-90 psi static. Back ream 60'. Lost slack Wt at 14,862' MD. PJSM C/O Swab, Liner & wear plat on MP# 1 Pod 2. ROT
Rec F/ 15,177' to 15,115' MD 290 gpm/ mpd 277, 1,190 psi, 45 rpm, TRQ 22-23k. ECD 10.88, Max Gas 638u. Drill 8.5" Hole F/15,177' to 15,363' MD (5,211'
TVD) Total 186' (AROP 93') 480 gpm/ mpd 463, 2,450 psi, 110 rpm, TRQ on 24-26k, TRQ off 22-24k, wob 6-10k. ECD 11.42, MW in/out 9.5, Max Gas 728u. P/U
167k, SLK 35k, ROT 111k. MPD 100% open dynamic/60-80 psi static. Back ream 60'. Distance to WP09: 8.9’, 8.8’ Low 1.32’ Right Fault #1 12,140' MD Throw 20'
DTN. 47 concretions for a total thickness of 350' (4.7% of the lateral hole section). Footage Oba Sand 5,815' Footage out: 1647' Total 7,462'. Daily disposal to G&I:
570 bbls, total= 11641 bbls. Daily H2O from Lake 2: 960 bbls, total 11150 bbls. Daily Metal: 0 Total 2.5. Daily losses 0 bbls. Surface loss total 1133 bbls.
4/21/2022 Drill 8.5" Hole F/15,363' to 16,004' MD (5,223' TVD) Total 641' (AROP 107') 500 gpm/ mpd 484, 2,460 psi, 120 rpm, TRQ on 26-28k, TRQ off 24-25k, wob 6-11k.
ECD 11.5, MW in/out 9.5, Max Gas 767u. P/U 189k, SLK 35k, ROT 110k. MPD 100% open Back ream 60'. Perform 460 bbls dilution at 15,745' to lower MBT.
Observe 300 psi pressure drop, but no decrease in TQ. Drill 8.5" Hole F/16,004' to 16,770' MD (5,239' TVD) Total 766' (AROP 128') 450 gpm/ mpd 440, 2,250 psi,
120 rpm, TRQ on 19-21k, TRQ off 17-18k, wob 5-11k. ECD 11.5, MW in/out 9.5, Max Gas 840u. P/U 190k, SLK 35k, ROT 113k. MPD hold 100 psi to mitigate
losses over shakers due to gas. Back ream 60'. Begin additions of Lube 776 at 16,200 up to 0.25% reducing TQ from 26-28Kft-lbs to 19-21Kft-lbs. Drill 8.5" Hole
F/16,770' to 17,468' MD (5,250' TVD) Total 698' (AROP 116') 450 gpm/ mpd 430, 2,330 psi, 120 rpm, TRQ on 21-23k, TRQ off 19-20k, wob 5-11k. ECD 11.57,
MW in/out 9.5, Max Gas 680u. P/U 195k, SLK 35k, ROT 113k. MPD hold 100 psi to mitigate shakers. Back ream 60'. Drill 8.5" Hole F/17,468' to 18,030' MD
(5,263' TVD) Total 562' (AROP 93.7') 450 gpm/ mpd 431, 2,385 psi, 100 rpm, TRQ on 23-24k, TRQ off 22k, wob 4-10k. ECD 11.62, MW in/out 9.55/9.6, Max Gas
665u. P/U 209k, SLK 35k, ROT 111k. MPD 100% open, hold 100 psi dynamic. Back ream 60'. Distance to WP09: 55.07’, 54.56’ Low 7.44’ Right. Fault #1 12,140'
MD Throw 20' DTN. 61 concretions for a total thickness of 424' ( 4.7% of the lateral hole section). Footage Oba Sand 8,492' Footage out: 1645' Total 10,137'. Daily
disposal to G&I: 1015 bbls, total= 12656 bbls. Daily H2O from Lake 2: 840 bbls, total 11990 bbls. Daily Metal: 0 Total 2.5. Daily losses 0 bbls. Surface loss total
1133 bbls.
4/22/2022 Drill 8.5" Hole F/18,030' to 18,436' MD (5,252' TVD) Total 406' (AROP 68 fph) 450 gpm/ mpd 431, 2,430 psi, 120 rpm, TRQ on 26-27k, TRQ off 24-25k, wob 5-
12k. ECD 11.62, MW in/out 9.55/9.6, Max Gas 504u. P/U 198k, SLK 35k, ROT 110k. MPD 100% open, Back ream 60'. Start building angle, targeting 99° while
evaluating interpretation and low resistivity within the formation to confirm wellbore is within Oba sands. Drill 8.5" Hole F/18,436' to 18,744' MD (5199' TVD) Total
308' (AROP 51fph) 500 gpm/ mpd 476, 2930 psi, rpm, 100-120 TRQ on 26-28k, TRQ off 20-222k, wob 7-12k. ECD 11.9 MW in/out 9.55/9.6, Max Gas 575u. P/U
189k, SLK 35k, ROT 106k. MPD 100% open, Back ream 60'. at 18,450 target 103° inclination while continuing to evaluate interpretation. Confirm top of OA- sand
at 18,644', continue to drill to 18744' to log top of OA with MWD. Obtain final survey 18,744' MD 5,199' TVD, 102.5° Inc 318.6° Azi Pump 40 bbl 8.9 ppg 37 Vis &
9.5 ppg 240 Vis tandem sweeps. Sweeps on time W/ 0% increase. Perform 4X BU clean up cycle. Rot Rec F/ 18,744' to 18,698' MD 500 gpm/ mpd 479, 2930 psi,
rpm,120 TRQ 23-24k, ECD 11.54 MW in/out 9.55/9.6, Max Gas 45u. P/U 168k, SLK 35k ROT 108k Build SAPP train & prep for displacement. PJSM Displace F/
9.5 ppg Spud Mud to 9.5 ppg QuickDril 3% Lubes. Pump 3X 40 bbl SAPP Pill W/ 20 bbl QuickDril in-between. Chase W/ QuickDril. Rot Rec F/ 18,744’ to 18,698’
MD 330 gpm/ mpd 317, 1,010 psi 120 rpm Trq 24-25k. ECD 10.36. Max Gas 20u. P/U 181k SLK 35k ROT 114k. Monitor well 10 min, static. Shut in MPD, no
pressure build. PJSM Drop 2.39” OD rabbit. BROOH F/ 18,744’ to 18,485’ MD 500 gpm/ mpd 458, 1930 psi, 120 rpm, Trq 21-22k, ECD 10.7, Max Gas 36u. P/U
180k SLK 35k ROT 118k Distance to WP09: 50.24’, 1.55’ High 50.22’ Right Fault #1 12,140' MD Throw 20' DTN. 61 concretions for a total thickness of 424' (
4.7% of the lateral hole section). Footage Oba Sand 8,492' Footage out: 1645' Total 10,137'. Daily disposal to G&I: 974 bbls, total= 13630 bbls. Daily H2O from
Lake 2: 360 bbls, total 12350 bbls. Daily Metal: 0 Total 2.5. Daily losses 0 bbls. Surface loss total 1133 bbls.
4/23/2022 BROOH F/ 18,485’ to 15,752’ MD 500 gpm/ mpd 450, 1875 psi, 120 rpm, Trq 18k, ECD 10.6, Max Gas 390u. MPD 100% open. Pull speed 25-35 ft/min as hole
dictates. P/U 194k SLK 35k ROT 112k. Dynamic losses 30 bbls. BROOH F/ 15,752’ to 13,400’ MD 500 gpm/ mpd 465, 1840 psi, 120 rpm, Trq 14-18k, ECD 10.6,
Max Gas 443u. MPD 100% open. Pull speed 20-30 ft/min as hole dictates. P/U 180k SLK 71k ROT 115k F/ 15,592' to 15,355' MD observed intermittent pack offs
slow pull speed 1-10 ft/min. Dynamic losses 30 bbls. BROOH F/ 13,400’ to 10,345’ MD 500 gpm/ mpd 460, 1660 psi, 120 rpm, Trq 10-12k, ECD 10.55, Max Gas
684u. MPD 100% open. Pull speed 20-40 ft/min as hole dictates. P/U 158k SLK 90k ROT 121k Dynamic losses 39 bbls. BROOH F/ 10,345’ to 7,676’ MD 500
gpm/ mpd 472, 1610 psi, 120 rpm, Trq 7-9k, ECD 10.33, Max Gas 225u. MPD 100% open. Pull speed 20-40 ft/min as hole dictates. P/U 155k SLK 97k ROT 125k
Dynamic losses 15 bbls. No Rot/Pump out BHA at 84 gpm/ mpd 58. 180 psi due to swabbing. Saw 2-5k intermittent drag. Pump 30 bbl 9.5 ppg 325 vis sweep. Rot
& Rec F/ 7,676' to 7,610' MD. 500 gpm/ mpd 486, 1580 psi, 30 rpm, Trq 5-6k, ECD 10.17, Max Gas 856u. MPD 100% open. P/U 155k SLK 97k ROT 125k. Daily
disposal to G&I: 2237 bbls, total= 15867 bbls. Daily H2O from Lake 2: 240 bbls, total 12590 bbls. Daily Metal: 0 Total 2.5. Daily losses 98.5 bbls, Total 98.5 bbls.
Surface loss total 1133 bbls.
4/24/2022 Continue circulating sweep around, 40% increase in cuttings. 500 gpm, 1580 psi, 30-80 rpms, 6Kft-lbs, ECD 10.1 ppg, max gas 24u. Monitor well, static. Close
MPD chokes no pressure build. Pull MPD bearing, set trip nipple. Clean and clear rig floor. Service rig: grease crown, blocks, top drive, iron roughneck, drawworks.
Perform derrick inspection. Open coffin lid on TD and C/O leaking test port O-ring. Change out shaker motor bolt. Monitor well on trip tank 3 bph loss rate. POOH
laying down drill pipe from 7676' to 7488', no indication of swabbing. Pump dry job, blow down TD and geo-span. Cont. POOH laying down drill pipe to 4338'. P/U
109K, S/O 92K. Calc disp 16.8 bbls, actual 21.4 bbls. Cont. POOH laying down drill pipe from 4338' to 310'. L/D HWDP and Jars to 186'. Calculated displacement
for trip 45, actual 46. L/D BHA: flex collar, float sub. Remove sources. L/D flex, float sub and stabilizer. Plug in and download MWD. L/D TM & DM, remove pulsar.
L/D CTN, ALD and ADR. Close blinds. Break and L/D NRP, Bit and GeoPilot. Bit Grad 2-3-CT-A-X-I-WT-TD. Static loss ~3 bph. Clear and clean rig floor. L/D BHA
components. Set Iron roughneck in storage place. Remove Hydraulic elevators. PJSM Bring up 270 ea 7 1/4" OD solid body centrali zers. R/U fill up line. P/U
Weatherford 4.5" handling Equip. R/U 75T YC elevators. R/U JAM and tongs. Stage running jewelry in pipe shed. PJSM P/U M/U 4.5" 12.6# JFE-80S JBear Shoe
Track and check floats, good. Cont Float in hole 4.5" 12.6# JFE-80 liner W/ 4.5" 11.6# Welltec Mech Open Hole PKR & 4.5" Innovus HD Multicycle Frac Sleeve as
per tally F/ 68.82' to 657' MD. Use Best-O-Life 4010N. Install 7 1/4" OD solid body centralizers every Jnt. Remove every other brass shear pin form frac sleeves as
per plan. Torq turn average shoulder low 2450 lb, high 3100 lb, Max 5400 lb. P/U 38k SLK 38k. Lost 9 bbls. Cont Float in hole 4.5" 12.6# JFE-80 liner W/ 4.5"
11.6# Welltec Mech Open Hole PKR & 4.5" Innovus HD Multicycle Frac Sleeve as per tally F/ 657' to 4,036' MD. Use Best-O-Life 4010N. Install 7 1/4" OD solid
body centralizers every Jnt. Remove every other brass shear pin form frac sleeves as per plan. Torq turn average shoulder low 2450 lb, high 3100 lb, Max 5400 lb.
P/U 72k SLK 54k. Calc 72 bbls, Act 64 bbls Lost 18 bbls. Daily disposal to G&I: 171 bbls, total= 16038 bbls. Daily H2O from Lake 2: 240 bbls, total 12830 bbls.
Daily Metal: 0 Total 2.5. Daily losses 47 bbls, Total 98.5 bbls. Surface loss total 1133 bbls.
4/25/2022 Cont Float in hole 4.5" 12.6# JFE-80 liner from 4036' to 8073' W/ 4.5" 11.6# Welltec Mech Open Hole PKR & 4.5" Innovus HD Multicycle Frac Sleeve as per tally.
Use Best-O-Life 4010N. Install 7 1/4" OD solid body centralizers every Jnt. Remove every other brass shear pin form frac sleeves as per plan. Torque turn to 5400ft-
lbs. P/U 65k SLK 50k. Calc 144 bbls, Act 116 bbls Lost 27 bbls. Set down at 7934' work pipe down to 7995' with up to 15K down and 5K overpull. Cont Float in
hole 4.5" 12.6# JFE-80 liner from 8073' to 11,196' W/ 4.5" 11.6# Welltec Mech Open Hole PKR & 4.5" Innovus HD Multicycle Frac Sleeve as per tally . Use Best-O-
Life 4010N. Install 7 1/4" OD solid body centralizers every Jnt. Remove every other brass shear pin form frac sleeves as per plan. Verify total of 69 shear pins
removed (3 pins x 23 frac sleeves). P/U 72K, S/O 48K. Observe 5-15K drag through open hole, pick up and work pipe as needed due to lack of down wt. C/O
elevators and tongs to 7". PJSM M/U X/O 4.5" JBer P X 7" W563. P/U RIH 4 jnts 7" 26# L-80 W563 filling each jnt to 11,359' MD. C/O elevators to Hydraulic 5"
D.P. P/U M/U SLZXP & 2 3/8" 5,000 psi rupture disk & 1.75" ball seat. M/U to Liner to 11,405' MD. R/D Weatherford handling Equip. Static loss rate ~3 bph. PJSM
Convey 4.5" Liner W/ 5"19.5# S-135 NC50 D.P. F/ Derrick F/ 11,405' to 14,838' MD. Filling every stand and top off every 5. Observe interment drag down to ~40k
string wt while running, picked up without issue and continue running without issue. Run speed 10-40 ft/min as hole dictates. P/U 113k SLK 75k. Calc 28 bbl, Act -
21 bbl, lost 49 bbls. PJSM Convey 4.5" Liner W/ 5"19.5# S-135 NC50 D.P. F/ Derrick F/ 14,838' to 18,480' MD. Work tight hole F/ 18,275' to 18,291' MD using
string weight. Filling every stand and top off every 5. Observe interment drag down to ~40k string wt while running, picked up without issue and continue running
without issue. Run speed 10-40 ft/min as hole dictates. P/U 163k SLK 98k. Calc 28 bbl, Act 2 bbl, lost 26 bbls. Daily disposal to G&I: 57 bbls, total= 16095 bbls.
Daily H2O from Lake 2: 0 bbls, total 12830 bbls. Daily Metal: 0 Total 2.5. Daily losses 88 bbls, Total 233 bbls. Surface loss total 1133 bbls.
o 18744' to log top of OA with MWD.
Cont Float in hole 4.5" 12.6# JFE-80 liner from 4036' to 8073' W/ 4.5" 11.6# Welltec Mech
4/26/2022 Rig up to shear Airlock and fill pipe. Set string in tension at 18,480'. Rig up pump in sub, TIW, head pin and high pressure hoses.
Pressure up on sting and observe Airlock burst at 896 psi. Pump 8 bbls at 5 bpm as per Airlock procedure. Wait 30 min to allow fluid to swap. Line adn fill pipe
using charge pump at 1-1.5 bpm through pump in sub, allowing air to burp through head pin down bleeder line. Monitoring tubing with 1" line off bleeder hose.
Pump 85 bbls and shut down, wait for 20 minutes to allow fluid to swap. Pump 50 bbls down drill string, observe fluid at bleeder at 40 bbls and slow down rate.
Shut down and allow fluid to swap for 30 minutes. Pump last 35 bbls adjusting rate as needed to allow fluid to swap. Total pumped down drill sting 170 bbls.
Monitor well on trip tank with 3 bph loss rate. Rig up 5' pup joint, side entry sub and TIW. Screw in top drive and rig up hose to circulating manifold. Circulate a liner
volume at 4 bpm, 570 psi. Drop 1.25" phenolic ball and pump on seat at 4 bpm 495 psi, slow rate to 2 bpm with 72 bbls to go. Observe ball on seat at 4395 stokes
(calc 4677/290 bbls strokes) Pressure up to 3000 psi to set SLZXP. Pressure not holding taking ~1/2 bpm to maintain 3000 psi. Check surface equipment, shut in
pumps and observe pressure continue to drop. Bleed off. Shut manual IBOP. Pressure back up to 3000 psi, pressure still not holding, taking 3/4 bpm to maintain
3000 psi. Bleed off pressure. Discuss options with town. Pressure up to 3500 psi with mud pumps, attempt to increase pressure to 4000 psi with test pump, unable
to gain any pressure. Observed SLZXP neutralize at 3512 psi. Bleed off pressure and shut in, observe 341 psi build on drill pipe. Bleed off and shut in, 300 psi
pressure build. Discuss with town. Line up on trip tank and bleed pressure off drill pipe, 0.5bbls bled in 5 min. Shut in 5 mins with 58psi pressure built. Bleed 0.25
bbls in 5 min. Rig down pump in sub, TIW. Pick up and observe SLZXP free with 20K less PUW. Pumped total 283 bbls PJSM Shut UPR and purge air from
system. PT packer to 1,500 psi for 10 min on chart, good. Pumped 2.4 bbls, bled 2.4 bbls. Open UPR. Line up in drill string. Attempt to close WIV and floats at 2
bpm cycling pumps 2X to 1,000 psi, press bled down. Pumped 4.6 bbls for a total of 283 bbls to set WIV. Wash up at 2 bpm 143 psi cleaning packer tie back. Circ
Surf to surf at 10 bpm 470 psi Max Gas 649u. Monitor well & went static at 10 min, monitor another 5 min, static. PJSM POOH rack back one stand and 20' pup to
7,030' MD. Pump dry job & blow down TD, choke, kill and manifold. Cont POOH L/D 5" D.P. F/ 7,030' to 2,837' MD. Calc 36 bbls, Act 45 bbls, lost 9 bbls. Cull D.P.
for CAT 5 in pipe shed. PJSM Cont POOH L/D 5" D.P. F/ 2,837' to 295' MD. Calc 22 bbls, Act 29 bbls, lost 7 bbls. Cull D.P. for CAT 5 in pipe shed. RIH W/
remaining 5" D.P. F/ derrick F/ 295' to 6,122' MD. P/U 131k SLK 92k. Calc 50.4 Act 43.4, lost 7 bbls. POOH L/D 5" D.P. F/ 6,122' to 4,100' MD. P/U 105k SLK 85k.
Calc 14 bbls, Act 16.5 bbls, lost 2.5 bbls. Cull D.P. for CAT 5 in pipe shed. Daily disposal to G&I: 57 bbls, total= 16152 bbls. Daily H2O from Lake 2: 120 bbls, total
12950 bbls. Daily Metal: 0 Total 2.5. Daily losses 53 bbls, Total 286 bbls. Surface loss total 1133 bbls.
Pressure up to 3000 psi to set SLZXP.
Pump 8 bbls at 5 bpm as per Airlock procedure. Wait 30 min to allow fluid to swap. Pressure up on sting and observe Airlock burst at 896 psi. Line adn fill pipe
using charge pump at 1-1.5 bpm through pump in sub, allowing air to burp through head pin down bleeder line.
Rig up to shear Airlock and fill pipe.
Activity Date Ops Summary
4/27/2022 Cont. to POOH laying down drill pipe from 6122' to 200'. Calc disp 36 bbls, Actual 46 bbls.,Cut and slip 94' of drillin gline. Check brake air gaps. Service rig: grease
crown, blocks, top drive, wash pipie, spinners, iron roughneck and drawworks. Check oil in top drive. Check top drive cradle weld crack Service pipe skate.,POOH
from 200', L/D drill pipe and liner running tool.,Rig up to RIH with tie-back string. Pull wear bushing. Remove 5" hydraulic elevators. Clean and clear rig floor. Bring
Weatherford job box, slips, dog collar to rig floor. R/U elevators and power tongs. Verify pipe count in shed. Pick up bullet seals and RIH with 7", L-80, BTC casing
as per detail to 3912'. M/U to diamond with an average TQ of 9,000 ft-lbs and checking TQ. PUW 107K, SOW 84K. Continue RIH with 7", L-80, BTC casing as per
detail F/ 3912' - T/ tag depth @ 7091' MD. M/U to diamond with an average TQ of 9,000 ft-lbs and checking TQ. PUW 168K, SOW 110K. Tag 2x w/ 20k dn.
Calculate spaceout w/ BOT rep. 3-4k seal drag. Pressure up annulus @ tag depth to 300 psi to ensure seals are engaged (good). Bleed off same.,L/D tag jts. M/U
3.82' spaceout pup below first full jt (#170). M/U hanger w/ landing jt. Landout (1.69' off no go). Shut annular and rig up to reverse circulate. Pressure up annulus to
250 psi, strip up and locate circ ports on seal assy.,Reverse circulate down 9-5/8" x 7" annulus w/ 115 bbls 9.5 ppg CI brine followed by 85 bbls diesel. LRS ICP 50
psi @ 1 bpm, FCP 400 psi @ 1.5 bpm.,Strip down and landout tieback @ final set depth 7089.37' MD (75k string wt on hanger). Remove landing joint. M/U packoff
running tool. Set packoff and test same 500/5000 psi w/ 5/15 min hold. Line up and purge lines. PT 9-5/8" x 7" annulus to 1500/30 minuts - good. 2.1 bbls pumped,
2.0 bbls bled back. R/D and B/D test lines.,R/D casing equipment, R/U to RIH with 4-1/2" upper completion. C/O power tongs and pipe handling equipment. Install
4-1/2" elevators. Prep shed and verify pipe count.,Daily disposal to G&I: 0 bbls, total= 16152 bbls. Daily H2O from Lake 2: 120 bbls, total 13070 bbls. Daily Metal: 0
Total 2.5. Daily losses 63 bbls, Total 349 bbls. Surface loss total 1133 bbls.
4/28/2022 PJSM, M/U 4.5" mule shoe, "X" nipple 3.813" profile (RHCM), TNT pkr assy. Baker loc all connections from Pkr down. Run 4.5" VamTop, L-80, 12.6# upper
completion as per detail F/ surface to 5992' MD. Weatherford JAM used to QC connections 4400 ft/lbs tq. 90 fpm as per HES rep. P/U 85k, S/O 64k. 9 bbl
loss.,Continue run 4.5" VamTop, L-80, 12.6# upper completion as per detail F/ 5992' - T/ 7227' MD. M/U hanger and landout final depth 7252' MD with 34k string
wt on hanger. Weatherford JAM used to QC connections 4400 ft/lbs tq. 90 fpm as per HES rep. P/U 101k, S/O 69k. RILDS. L/D landing joint.,M/U TCII xo w/
landing joint. R/U circulating equipment to reverse circulate IA to tbg. Reverse circulate Clean brine 1x tbg capacity (110 bbls) followed by 1x IA capacity (277 bbls)
of CI 9.5 brine @ 4 bpm, ICP 390, FCP 320. Shut down, drop ball and rod. 30 min fall time for ball and rod. Purge air from pumping and testing equipment. Pump
ball on seat and observe packer set @ 2150 psi. Monitor OA (0 psi). Pressure test tubing 3500 psi w/ 30 min hold (questionable test w/ 2x 20 psi bobbles on chart).
Bleed down, shut down rig hydraulics and retest with slight but steady psi drop (failed test). L/D landing joint, Troubleshoot surface equipment. Retest using blind
rams. Double block and isolate surface equipment. Pressure up to 3700 psi with same results. IA maintained a 50 psi increase every time, OA @ 0 psi. Discussed
with town engineer. Concluded tubing had good integrity and leak was at ball and rod seat. Chart and record test. Bleed down tbg to 2000 psi and test IA to 3500 psi
w/ 30 min hold (good test). Bleed down tbg and shear GLM SOV (good shear).,Install BPV. Flush surface equipment with soap pill. Johnny whack stack and jet
flowline. B/D cmt line, choke and kill lines. B/D TDS, mud pumps and drain stack. B/D circulating equipment. PJSM, Remove trip nipple, Install MPD cap. N/D
choke and kill lines. N/D 4 point chain, drip pan, koomey lines. Unflange from tubing spool. Rack back BOP's on stump and secure same. Sym Ops - Clean pits.
Inspect mud pumps. N/U tree and tq flange 3330 ft/lbs as per Wellhead rep. Remove BPV and install TWC. Test void 500/5000 psi with good test. Test tree
250/5000 psi w/ 10 min hold on ea (good test). Test fluid diesel. Witness by Co Rep. Daily disposal to G&I: 746 bbls, total= 16898 bbls. Daily H2O from Lake 2: 120
bbls, total 13190 bbls. Daily Metal: 0 Total 2.5. Daily losses 17 bbls, Total 366 bbls. Surface loss total 1133 bbls.
4/29/2022 Freeze protect 4.5" x 7" IA and 4.5" tubing with 96 bbls diesel. Sym Ops - Clean pits and prep for rig move. Secure well and release rig @ 12:00.
50-029-23711-00-00API #:
Well Name:
Field:
County/State:
PBW M-201
Prudhoe Bay West
Hilcorp Energy Company Composite Report
, Alaska
Concluded tubing had good integrity and leak was at ball and rod seat.
Pressure test tubing 3500 psi w/ 30 min hold
ACTIVITYDATE SUMMARY
4/29/2022
MU FMC Gen 5 tubing hanger, 4-1/2" TC-II, 4" H BPV profile with 4-1/2" TC-II pin x 4-
1/2" Vam Top pin x/o pup to completion string. Land hanger at 22.03¿ RKB, verify
landed thru IA, RILDS, torque gland nuts to 450 ft/lbs, torque LDS to 450 ft/lbs.
Standby for rig to circulate. Set 4" BPV with dry rod, rig crew ND BOP. Clean
hanger top, lift threads, BPV retrieval threads, inspect seal areas, fill void with test oil,
install new RX-54, NU 11" x 4" THA with dry hole tree. RU test equipment, pump
hyd oil across test void, good returns. Sting into SBMS monitor port for duration of
test. Test THA void to 500 psi low for 10 mins, PASS. Test THA void to 5000 psi for
10 mins, PASS. Bleed all test pressure and drain hyd oil. RD test equipment.
Pulled BPV and set TWCV. Rig tested tree with diesel 250/5000 for 10 mins each,
PASS. Bleed all test psi, pull 4" H TWCV with dry rod. Secure tree.
4/30/2022
T/I/O=0/0/0. Post I-Rig. Removed 4" dryhole temp valve and inatalled 4" CIW
production tree with SH-3000 acutator, Pressure tested against MV to 350/5000 PSI
(Pass). Installed production piping, Torqued all flanges to specs. Set well house
and floor kit. Final WHP's 0/0/0. ***Job Cmplete***
5/1/2022
***WELL S/I ON ARRIVAL*** (leak detection log)
PULLED BALL & ROD f/ RHC PLUG BODY @ 7724' MD
PULLED BEK-SHEAR VALVE FROM GLM @ 2,831' MD.
SET BK-DGLV IN GLM @ 2,831' MD.
PULLED 3.813" RHC PLUG BODY @ 7,224' MD.
***JOB CONTINUED ON 5/2/22 WSR***
5/2/2022
***JOB CONTINUED FROM 5/1/22 WSR***(leak detection).
RIGGED DOWN POLLARD SL #60.
***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE***
5/4/2022 Travel to location, SB to rig up
5/4/2022
T/I/O = 480/0/0. Temp = SI. TBG & IA FL (E-line Req). TBG FL @ 324' (5 bbls). IA
FL @ surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:30
5/4/2022
***WELL S/I ON ARRIVAL***
RIG UP HES 759
***CONT WSR ON 05/05/2022***
5/5/2022
***CONT WSR FROM 05/04/2022***
BRUSH X-NIPPLE @ 7,224' MD W/ 4-1/2" BLB, 3.78" G.RING
SET 4-1/2" XX-PLUG IN X-NIPPLE @ 7,224' MD
AOGCC STATE WITNESS MIT-T & MIT-IA 3500# (see log for details)
EQUALIZE & PULL 4-1/2" XX-PLUG FROM X-NIPPLE @ 7,224' MD
***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS***
5/5/2022
Assist Sl with AOGCC MIT-T MIT IA (Witnessed by Adam Earl ) T/I/O = 181/6/0
MIT-T to 3588 psi. ( PASSED) MIT IA to 3628 psi. ( PASSED ) SL on well at time of
departure.
5/7/2022
***WELL SHUT IN ON ARRIVAL, DSO NOTIFIED*** (TRACTOR BASELINE)
RIH W/ 3-1/8" WELLTEC TRACTOR W/STP LOGGING TOOLS.
UNABLE TO GET THROUGH FRAC SLEEVE AT 14797', MADE MULTIPLE
ATTEMPTS W/O PROGRESS.
DECSION MADE TO TRY SMALLER TRACTOR IN AM.
TOOLS CAKED W/ WHAT LOOKS LIKE FORMATION SAND,
...CONT ON 8-MAY-2022...
5/8/2022
T/IA/OA=150/540/0
Assist Eline with LDL, Pumped 83 BBLS DSL down TBG
Eline in control of well upon departure
Daily Report of Well Operations
PBU M-201
(
MIT-T to 3588 psi. ( PASSED) MIT IA to 3628 psi. (
Daily Report of Well Operations
PBU M-201
5/8/2022
...CONT FROM 7-MAY-2022...
UNABLE TO PASS THROUGH RESTRICTION/OBSTRUCTION AT 14400' WHILE
TRACTORING AND PUMPING
LOG LDL WHILE PUMPING 0.75 BPM TO 7000'
***WELL LEFT S/I UPON DEPARTURE, TURNED OVER TO DSO***
5/25/2022
CTU 9
Pipe swap from 1.75" to 2.0"
***Continued on 5/26/2022***
5/26/2022
CTU 9
Pipe swap from 1.75" to 2.0"
***Continued on 5/27/2022***
5/27/2022
CTU 9
Pipe swap from 1.75" to 2.0"
***In Progress***
5/28/2022
CTU 9 2.0" CT
Job Objective: FCO, Drift for NCS BHA, Set packers, and shift sleeves
Road unit from the yard to M-201. MIRU. Make up BOT 2-7/8" Tempress BHA w/ 3"
JSN and RIH. Ran into lock up at 11330, circed gel pill and safelube. Clean gel pill
returned, shut down pumps and continue dry drift down to 14557. Run into lock
up/fill. Begin jetting.
***Job Continued 5/29/2022***
5/29/2022
CTU 9 2.0" CT
Job Objective: FCO, Drift for NCS BHA, Set packers, and shift sleeves
Continue jetting at sleeve #10 with gel, chase out. Continue in hole until lock up at
17093. Circ in more safelube.Tag TD at 18429' ctm. Pump 15 bbls gel sweep off
bottom and chase ooh jetting across jewelry. Pump gel sweep at heel and chase out
of hole.
***Job Continued on 5/30/2022***
5/30/2022
CTU 9 2.0" CT
Job Objective: FCO, Drift for NCS BHA, Set packers, and shift sleeves
Continue pulling and chasing gel out of hole. Swap out tempress. Make up and RIH
with BOT whipstock drift BHA with 3.800" gage rings. Tag at 18434' ctm. Lay in Lube
776/LoTorq pill. Pooh pumping pipe voidage. RIH with NCS sleeve shifting BHA.
RIH to TD and set packer below lowest welltec packer. Could not pressure up to set
packers. Tried to set again - same results. Set NCS packer above welltec packer
and had the same leak off rate. Proceed with shifting sleeves.
Shift sleeve #1 at 1080psi, 2bpm @ 500 psi
Shift sleeve #2 at 1105psi, 2bpm @ 587 psi
Shift sleeve #3 at 1389psi, 2bpm @ 734psi
Set at 17450 - Below Welltec packer, pressured up to 2000psi, same bleed off rate.
Unset tool with 400psi differential to confirm element set. WHP fell rapidly -
confirmed element was set.
Shift sleeve #4 at 1215psi, 3bpm @ 1070psi. *Stopped pressuring up at 1000psi
during the set to see if pressure would hole above welltec packer, prior to shifting -
did not hold.
***Job Continued on 5/31/2022***
Daily Report of Well Operations
PBU M-201
5/31/2022
CTU 9 2.0" CT
Job Objective: FCO, Drift for NCS BHA, Set packers, and shift sleeves
Continue shifting sleeves and hunting for leaks.
Shift sleeve #5 at 1391psi, 2bpm @ 801psi
Shift sleeve #6 at 1369psi, 2bpm @ 753psi
Shift sleeve #7 at 1269psi, 2bpm @ 740psi
Set below packer at 15811 and had the same leak rate. Set directly above this
packer as well, same leak rate.
Shift sleeve #8 at 1392psi, 3bpm @ 1070psi
Shift sleeve #9 at 1526psi, 2bpm @ 799psi
Set below packer at 14685 and had the same leak rate, .6bpm at 2400psi.
Set above packer at 14685 and have the same leak rate. P-subs closed to confirm
Shift sleve #10 at 1426psi, 3bpm @ 1067psi
Shift sleeve #11 at 1636psi, 2bpm @ 887psi
Shift sleeve #12 at 1647psi, 2bpm @ 869psi
Set below packer 13599 leak rate is .4bpm at 2110psi
Sleeves 13, 14, & 15 left closed.
Set below packer at 12131 and pressure held at 2281. Go through Welltec packer
setting procedure and inflate packers to 4800psi.Still had to pump at ~.2bpm to
maintain pressure.
Diagnostic set at 12840, 12550, 12340, 12275 - all had similar leak rates of
100psi/minute.
Shift sleeve #16 at 1055psi, 2.8bpm @ 974psi
Shift sleeve #17 @ 1677psi, 2bpm @ 785psi
Shift sleeve #18 @ 1100 psi, 2 bpm @ 770 psi
Shift sleeve #19 @1350 psi, Estblish an injection rate of 1.8 bpm at 1060 psi for 5
mins
Shift sleeve #20 @ 1306 psi, 2 bpm @ 840 psi
Shift sleeve #21 @ 1386 psi, 2 bpm @ 850 psi
Shift sleeve #22 @ 1192 psi, Establish an injection rate of 3.4 bpm 1150 psi for 5
mins and 1200 psi at 5 bpm for 2 mins
TD Shoe Depth: PBTD:
No. Jts. Returned
RKB RKB to BHF RKB to THF
Jts.
130
56
Yes X No Yes X No 5.4
Fluid Description:
Liner hanger Info (Make/Model): Liner top Packer?: Yes No
Liner hanger test pressure:X Yes No
Centralizer Placement:
Preflush (Spacer)
Type: Density (ppg) Volume pumped (BBLs)
Lead Slurry
Type:Sacks: Yield:
Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm):
Tail Slurry
Type:Sacks: Yield:
Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm):
Post Flush (Spacer)
Type: Density (ppg) Rate (bpm): Volume:
Displacement:
Type: Density (ppg) Rate (bpm): Volume (actual / calculated):
FCP (psi): Pump used for disp:X Yes No
Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job
Cement returns to surface?x Yes No Spacer returns?x Yes No Vol to Surf:
Cement In Place At: Date: Estimated TOC:
Method Used To Determine TOC:
Preflush (Spacer)
Type: Density (ppg) Volume pumped (BBLs)
Lead Slurry
Type:Sacks: Yield:
Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm):
Tail Slurry
Type:Sacks: Yield:
Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm):
Post Flush (Spacer)
Type: Density (ppg) Rate (bpm): Volume:
Displacement:
Type: Density (ppg) Rate (bpm): Volume (actual / calculated):
FCP (psi): Pump used for disp:X Yes No
Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job
Cement returns to surface?X Yes No Spacer returns?X Yes No Vol to Surf:
Cement In Place At: Date: Estimated TOC:
Method Used To Determine TOC:
Post Job Calculations:
Calculated Cmt Vol @ 0% excess: Total Volume cmt Pumped:
Cmt returned to surface: Calculated cement left in wellbore:
OH volume Calculated: OH volume actual: Actual % Washout:
Casing (Or Liner) Detail
Float Shoe
9.625 CSG
RKB
10 3/4
440.5 1.50%434SECOND STAGE1
12:15
Returns to Surface
Rotate Csg Recip Csg Ft. Min. PPG9.5
Shoe @ 7781 FC @ Top of Liner7,695.00
Floats Held
434 bbl 744.5 bbl
304 440.5
H2O
CASING RECORD
County State Alaska Supv.J. Lott / C. Montague
Hilcorp Energy Company
CASING & CEMENTING REPORT
Lease & Well No.PBW M-201 Date Run 13-Apr-22
Setting Depths
Component Size Wt. Grade THD Make Length Bottom Top
TCP BTC Innovex 1.76 7,781.00 7,779.24
2,297.28 2,297.28
26.70
9 5/8 47.0 L-81 VAM Tenaris
Csg Wt. On Hook:35,000 Type Float Collar:Standard No. Hrs to Run:24
8.34 5.7
1880
10
10.7 280 3.5
100
281
Bump Plug?FIRST STAGE10Tuned Spacer 60
15.8
563
3.4
9.5 6 150/152.8
20/20
1630
102bbl cement
HES
15.8 87
Bump press
Cement Circulated to surface from stage tool depth
Bump Plug?
Y
0:25 4/14/2022 2,356
2356
7,781.007,790.00
CEMENTING REPORT
Csg Wt. On Slips:
Spud Mud
Tuned Spacer
461 2.88
Stage Collar @
60
Bump press
100
212
ES Closure OK
56.5
ArcticCem
Type
Type I/II 267
12 321
26.70 RKB to CHF
Type of Shoe:Standard Casing Crew:Weatherford
No. Jts. Delivered No. Jts. Run 209 19
Length Measurements W/O
Threads
Ftg. Delivered 8,360.00 Ftg. Run 7,781.00 Ftg. Returned 579.00
Ftg. Cut Jt.29.39 Ftg. Balance
www.wellez.net WellEz Information Management LLC ver_04818br
3.4
Jnt 1 2 ea 10' from end, 1 ea jnt 3 & 4. Every jnt F/ 5-26, every other F/ jnt 28-50, 1 ea 130-134, 1 ea ES pups, 1 ea
jnt 144-148, every third jnt F/ 151-193. 65 total solid bow spring.
9.625 CSG 9 5/8 40.0 L-80 TCP BTC Tenaris 82.14 7,779.24 7,697.10
Float Collar 10 3/4 TCP BTC Innovex 1.46 7,697.10 7,695.64
9.625 CSG 9 5/8 40.0 L-80 TCP BTC Tenaris 39.14 7,695.64 7,656.50
Baffle Adapter 10 3/4 TCP BTC Halliburton 1.41 7,656.50 7,655.09
9.625 CSG 9 5/8 40.0 L-80 TCP BTC Tenaris 5,278.26 7,655.09 2,376.83
Pup 9 5/8 40.0 L-80 TCP BTC Tenaris 18.07 2,376.83 2,358.76
ES Cementer 11 3/4 TCP BTC Halliburton 2.81 2,358.76 2,355.95
Pup 9 5/8 40.0 L-80 TCP BTC Tenaris 17.59 2,355.95 2,338.36
9.625 X/O 9 5/8 47.0 L-80 VAM Tenaris 41.08 2,338.36 2,297.28
Type I/II 769 2.35
Type I/II 400 1.16
4.5
1.17
4/15/2022 Surface
Spud Mud
Cement Circulated to surface from stage tool depth
100
Returns to Surface
Surface
100
X Y
'HILQLWLYH6XUYH\5HSRUW
$SULO
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
0
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0DS6\VWHP
*HR'DWXP
3URMHFW
0DS=RQH
6\VWHP'DWXP866WDWH3ODQH([DFWVROXWLRQ
1$'1$'&21&2186
3UXGKRH%D\1RUWK6ORSH81,7('67$7(6
$ODVND=RQH
0HDQ6HD/HYHO
8VLQJ:HOO5HIHUHQFH3RLQW
8VLQJJHRGHWLFVFDOHIDFWRU
:HOO
:HOO3RVLWLRQ
/RQJLWXGH
/DWLWXGH
(DVWLQJ
1RUWKLQJ
XVIW
(:
16
3RVLWLRQ8QFHUWDLQW\
XVIW
XVIW
XVIW*URXQG/HYHO
0
XVIW
XVIW
:HOOKHDG(OHYDWLRQXVIW
1
:
:HOOERUH
'HFOLQDWLRQ
)LHOG6WUHQJWK
Q7
6DPSOH'DWH 'LS$QJOH
0
0RGHO1DPH0DJQHWLFV
,)5
3KDVH9HUVLRQ
$XGLW1RWHV
'HVLJQ 0
$&78$/
9HUWLFDO6HFWLRQ 'HSWK)URP79'
XVIW
16
XVIW
'LUHFWLRQ
(:
XVIW
7LH2Q'HSWK
)URP
XVIW
6XUYH\3URJUDP
'HVFULSWLRQ7RRO1DPH6XUYH\:HOOERUH
7R
XVIW
'DWH
6XUYH\'DWH
*<'B4XHVW*:'*\URGDWD6WDWLRQDU\63($5*:'WRROLQRSHQ 04XHVW*:'0
B0:',)5066DJ $0E,,)5GHF PXOWLVWDWLRQDQDO\VLVVD 00:',)5066DJ0
B0:',)5066DJ $0E,,)5GHF PXOWLVWDWLRQDQDO\VLVVD 00:',)5066DJ0
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
81'(),1('
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
*<'B4XHVW*:'
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
*<'B4XHVW*:'
*<'B4XHVW*:'
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
B0:',)5066DJ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
'HILQLWLYH6XUYH\5HSRUW
:HOO
:HOOERUH
0
06XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DFWXDO#XVIW
'HVLJQ0'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DFWXDO#XVIW
1RUWK5HIHUHQFH
:HOO0
7UXH
0'
XVIW
,QF
$]L
(:
XVIW
16
XVIW
6XUYH\
79'
XVIW
79'66
XVIW
0DS
1RUWKLQJ
IW
0DS
(DVWLQJ
IW
9HUWLFDO
6HFWLRQ
IW
'/6
6XUYH\7RRO1DPH
B0:',)5066DJ
B0:',)5066DJ
352-(&7('WR7'
$SSURYHG%\&KHFNHG%\'DWH
$0 &203$66%XLOG(3DJH
Chelsea Wright Digitally signed by Chelsea
Wright
Date: 2022.04.25 08:24:28 -08'00'
Benjamin Hand Digitally signed by Benjamin Hand
Date: 2022.04.25 09:55:38 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, June 20, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Matt Herrera
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
M-201
PRUDHOE BAY UN POL M-201
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/20/2022
M-201
50-029-23711-00-00
222-030-0
W
SPT
5015
2220300 1500
1171 1159 1129 1109
24 262 209 165
INITAL F
Matt Herrera
6/7/2022
MIT-IA Performed to 1900 PSI Per Operations. Operations will reschedule upon review of test and operating parameters that could have
contributed to failure and proceed with a retest at a later date. Operations will shut well in if not able to retest within required timeframe.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN POL M-201
Inspection Date:
Tubing
OA
Packer Depth
23 1923 1775 1701IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitMFH220607103912
BBL Pumped:1.1 BBL Returned:1
Monday, June 20, 2022 Page 1 of 1
9
9
9
9
9
9
9 9
9
9
7RWDO3UHVVXUHORVVH[FHHGHGDOORZHGGXULQJPLQWHVWMEU
MIT-IA Performed to 1900 PSI
F
James B. Regg Digitally signed by James B. Regg
Date: 2022.06.20 16:56:59 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, June 13, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Adam Earl
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
M-201
PRUDHOE BAY UN POL M-201
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/13/2022
M-201
50-029-23711-00-00
222-030-0
N
SPT
5015
2220300 1500
2026 2485 2492 2490
0 80 78 75
OTHER P
Adam Earl
5/5/2022
MIT-IA Tested as per PTD 2220300 post drill.pre injection
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN POL M-201
Inspection Date:
Tubing
OA
Packer Depth
1080 3667 3640 3628IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitAGE220509121847
BBL Pumped:1.6 BBL Returned:1.6
Monday, June 13, 2022 Page 1 of 1
9
9
9
9
9
9
99
9
9
SVLWHVWUHT
G
MIT-IA T .pre injection
James B. Regg Digitally signed by James B.
Regg
Date: 2022.06.13 14:44:26 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, June 13, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Adam Earl
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
M-201
PRUDHOE BAY UN POL M-201
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/13/2022
M-201
50-029-23711-00-00
222-030-0
N
SPT
5015
2220300 1500
2026 3687 3612 3588
0 0 0 0
OTHER P
Adam Earl
5/5/2022
MIT-T Tested as per PTD 2220300 post drill.pre injection
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN POL M-201
Inspection Date:
Tubing
OA
Packer Depth
1076 1243 1244 1241IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitAGE220509120720
BBL Pumped:0.7 BBL Returned:0.7
Monday, June 13, 2022 Page 1 of 1
9
9
9
9
9
9
9
9
SVLWHVWUHT
G
9
9
.pre injectionMIT-T T
James B. Regg Digitally signed by James B. Regg
Date: 2022.06.13 14:41:26 -08'00'
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: OPERABLE: Grassroots Injector M-201 (PTD #222030) AOGCC required initial MIT-IA failed
Date:Wednesday, June 8, 2022 2:02:02 PM
Attachments:image001.png
MIT PBU M-201 06-07-22.xlsx
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, June 8, 2022 9:25 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>;
Stan Golis <sgolis@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>; Brodie Wages
<David.Wages@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>
Subject: OPERABLE: Grassroots Injector M-201 (PTD #222030) AOGCC required initial MIT-IA failed
Mr. Wallace,
Fullbore and DHD performed a failing AOGCC witnessed MIT-IA on 6/7/22. It was determined that
during the test, the injection rate was changed as the result of a choke change made inadvertently
by an instrumentation tech. The well was shut-in due to upcoming facility maintenance work
scheduled to begin tomorrow. The witnessed MIT-IA will be rescheduled after the facility work,
when the well is back online under stable conditions.
Sorry for any inconvenience. Please feel free to contact me if you have any questions.
John Condio (covering for)
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659-5102
M: (907) 232-1005
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
Submit to:
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD 2220300 Type Inj W Tubing 1171 1159 1129 1109 Type Test P
Packer TVD 5015 BBL Pump 1.1 IA 23 1923 1775 1701 Interval I
Test psi 1500 BBL Return 1.0 OA 24 262 209 165 Result F
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes
W = Water P = Pressure Test I = Initial Test P = Pass
G = Gas O = Other (describe in Notes)4 = Four Year Cycle F = Fail
S = Slurry V = Required by Variance I = Inconclusive
I = Industrial Wastewater O = Other (describe in notes)
N = Not Injecting
Notes:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov
Notes:
Notes:
Notes:
Hilcorp Alaska LLC
Prudhoe Bay / PBU / M Pad
Ryan Holt
06/07/22
Notes:AOGCC MIT-IA post initial injection. PWI injection rate & pressure was unstable due to instrument tech apperantly drove the choke to a pinched back setting during the
MIT-IA. Well was shut-in 6/7/22. MIT-IA will be rescheduled when well is BOI and stable after upcoming facility maintenance work.
Notes:
Notes:
Notes:
M-201
Form 10-426 (Revised 01/2017)MIT PBU M-201 06-07-22
David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Hilcorp North Slope, LLC
Date: 05/24/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL : *** REVISION #2 ***
Note: This re-distribution supersedes previously delivered Final LWD data for PBU M-201
PBU M-201 (PTD: 222-030 API: 50-029-23711-00-00)
FINAL LWD FORMATION EVALUATION LOGS (04/07/2022 to 04/22/2022)
x ROP, AGR, DGR, ABG, EWR-M5, ADR, Horizontal Presentation (2” & 5” MD/TVD Color Logs)
x Final Definitive Directional Survey
x Final Geosteering and EOW Report/Plots
SFTP Transfer – Main Folders:
PBU M-201 LWD Subfolders:
PBU M-201 Geosteering Subfolders:
Please include current contact information if different from above.
PTD:222-030
T36552
Revision 2
Kayla Junke
Digitally signed by Kayla
Junke
Date: 2022.05.24 13:33:52
-08'00'
David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Hilcorp North Slope, LLC
Date: 05/12/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL : *** REVISED DATA ***
Note: This re-distribution supersedes previously delivered Final LWD data for PBU M-201
PBU M-201 (PTD: 222-030 API: 50-029-23711-00-00)
FINAL LWD FORMATION EVALUATION LOGS (04/07/2022 to 04/22/2022)
x ROP, AGR, DGR, ABG, EWR-M5, ADR, Horizontal Presentation (2” & 5” MD/TVD Color Logs)
x Final Definitive Directional Survey
x Final Geosteering and EOW Report/Plots
SFTP Transfer – Main Folders:
PBU M-201 LWD Subfolders:
PBU M-201 Geosteering Subfolders:g
Please include current contact information if different from above.
PTD:222-030
T36552
Revised
Kayla Junke
Digitally signed by Kayla
Junke
Date: 2022.05.12 13:51:54
-08'00'
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Rixse, Melvin G (OGC)
To:AOGCC Records (CED sponsored)
Subject:20220505 1600 NOTIFICATION PTD 222-030 PBU M-201 - MITs
Date:Thursday, May 5, 2022 4:57:31 PM
Subject: PBU M-201 - MITs
Eric,
I wont advise differently. Let’s hope the ball and rod were leaking. AOGCC will want notification
for opportunity to witness.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
cc. Oliver, Chris Wallace, AOGCC Inspectors
From: Eric Dickerman <Eric.Dickerman@hilcorp.com>
Sent: Tuesday, May 3, 2022 5:17 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity
<PBWellsIntegrity@hilcorp.com>
Subject: PBU M-201 - MITs
Mel,
In reference to PTD 222-030, PBU M-201. The MIT-T performed on the rig did not pass the
stabilization criteria. The TBG pressured was up to 3,818 psi and after 30 min ended at 3,737 psi
with the IA pressure remaining at 50 psi throughout the test. The overall tubing pressure loss was
acceptable but did not meet the stabilization criteria. The MIT-T was attempted again with similar
results. Because the IA pressure did not show any response during the test, we believe the tubing
has integrity and that the ball and rod were leaking.
After the MIT-T attempt, the MIT-IA passed pressure loss and stabilization criteria beginning at 3,700
psi and ending 30 min at 3,615 psi with 1,000 psi differential greater than the tubing. The tubing did
not show signs of re-pressurization during the MIT-IA.
We are planning to send slickline out to the well to set a plug in the tubing and perform the MIT-T
and MIT-IA again, unless you advise otherwise.
Thank you,
Eric Dickerman
Hilcorp – FS2 OE
Cell: 307-250-4013
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Hilcorp North Slope, LLC
Date: 05/03/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL :
PBU M-201 (PTD: 222-030 API: 50-029-23711-00-00)
FINAL LWD FORMATION EVALUATION LOGS (04/07/2022 to 04/22/2022)
x ROP, AGR, DGR, ABG, EWR-M5, ADR, Horizontal Presentation (2” & 5” MD/TVD Color Logs)
x Final Definitive Directional Survey
x Final Geosteering and EOW Report/Plots
SFTP Transfer – Main Folders:
PBU M-201 LWD Subfolders:
PBU M-201 Geosteering Subfolders:g
Please include current contact information if different from above.
PTD:222-030
T36552
Kayla
Junke
Digitally signed by
Kayla Junke
Date: 2022.05.03
16:19:07 -08'00'
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:James Lott - (C)
To:Regg, James B (OGC);DOA AOGCC Prudhoe Bay;Brooks, Phoebe L (OGC)
Cc:Joseph Engel;Monty Myers;Oliver Amend - (C)
Subject:Hilcorp Innovation 04-16-22 BOP Test Report
Date:Sunday, April 17, 2022 10:00:39 AM
Attachments:Hilcorp Innovation 04-16-22.xlsx
James Lott
HILCORP Drilling Foreman
HILCORP INNOVATION Rig
PBU, North Slope Alaska
907-670-3094 (Office)
907-398-9069 (Cell)
Harmony 1006
jlott@hilcorp.com
jameslott352@yahoo.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
3%80
37'
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
SSu b m i tt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Owner/Contractor: Rig No.:Innovation DATE: 4/16/22
Rig Rep.: Rig Phone: 907-3095
Operator: Op. Phone:9073094
Rep.: E-Mail
Well Name: PTD #22220300 Sundry #
Operation: Drilling: x Workover: Explor.:
Test: Initial: x Weekly: Bi-Weekly: Other:
Rams:250/3000 Annular:250/3000 Valves:250/3000 MASP:1760
MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES:
Test Result Test Result Quantity Test Result
Location Gen.P Well Sign P Upper Kelly 1P
Housekeeping P Rig P Lower Kelly 1P
PTD On Location P Hazard Sec.P Ball Type 2P
Standing Order Posted P Misc.NA Inside BOP 1P
FSV Misc 0NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0NATrip Tank PP
Annular Preventer 1 13-5/8", 5K P Pit Level Indicators PP
#1 Rams 1 4-1/2""x 7"P Flow Indicator PP
#2 Rams 1 Blinds P Meth Gas Detector PP
#3 Rams 1 2-7/8"x5-1/2"P H2S Gas Detector PP
#4 Rams 0NAMS Misc 0NA
#5 Rams 0NA
#6 Rams 0NA Quantity Test Result
Choke Ln. Valves 1 3-1/8, 5K P Inside Reel valves 0NA
HCR Valves 2 3-1/8, 5K P
Kill Line Valves 2 3-1/8, 5K P
Check Valve 0NAACCUMULATOR SYSTEM:
BOP Misc 0 NA Time/Pressure Test Result
System Pressure (psi)3050 P
CHOKE MANIFOLD:Pressure After Closure (psi)1500 P
Quantity Test Result 200 psi Attained (sec)25 P
No. Valves 15 P Full Pressure Attained (sec)93 P
Manual Chokes 1P Blind Switch Covers: All stations Yes
Hydraulic Chokes 1FP Nitgn. Bottles # & psi (Avg.): 6 @ 2366 P
CH Misc 0NA ACC Misc 0NA
Test Results
Number of Failures:1 Test Time:6.5 Hours
Repair or replacement of equipment will be made within days.
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 4/15, 12:47
Waived By
Test Start Date/Time:4/16/2022 1:30
(date) (time)Witness
Test Finish Date/Time:4/16/2022 8:00
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Guy Cook
Hilcorp
FP on Super Choke.Pump and flush through Super Choke, Re-test with Pass.
Matt Vanhoose
Hilcorp
James Lott
PBU M-201
Test Pressure (psi):
jlott@hilcorp.com
Form 10-424 (Revised 02/2022) 2022-0416_BOP_Hilcorp_Innovation_PBU_M-201
99
9
9
9 9 9 9
9
9
9
-5HJJ
FP on Super Choke.Pump and flush through Super Choke, Re-test with Pass.
FP
4/16/22
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Rixse, Melvin G (OGC)
To:AOGCC Records (CED sponsored)
Subject:20220412 1711 APPROVAL to Variance (PTD#222030) Injection Packer Set Depth Variance
Date:Tuesday, April 12, 2022 5:12:56 PM
From: Rixse, Melvin G (OGC)
Sent: Tuesday, April 12, 2022 5:11 PM
To: Wyatt Rivard <wrivard@hilcorp.com>
Cc: Joseph Engel <jengel@hilcorp.com>
Subject: RE: M-201 (PTD#222030) Injection Packer Set Depth Variance
Wyatt,
As stated in your request below:
The production tubing packer will be set below the top of the Schrader N sands. Therefore,
variance to 20 AAC 25.412. (b) is approved.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
From: Wyatt Rivard <wrivard@hilcorp.com>
Sent: Tuesday, April 12, 2022 2:08 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Joseph Engel <jengel@hilcorp.com>
Subject: M-201 (PTD#222030) Injection Packer Set Depth Variance
Hello Mel,
The Innovation Rig TD’d the 9-5/8” surface hole section today at 7790’ MD on well M-201 (PTD #
222030). This places the target surface casing shoe depth at the top of the Schrader OBA sand at ~87
degrees inclination. Similar to our last grassroots injector, Z-221 (PTD # 221095), we are planning to
set the injection tubing packer and X-Nipple for ball and rod deployment at a slickline accessible
depth. The injection packer is planned to be set at ~7170’ MD with the ball and rod landing at ~7210’
MD (~65deg inclination). This will place the injection packer ~620’ MD from the surface casing shoe.
From a TVD standpoint the injection packer is 155’ TVD from the surface casing shoe and is below
the top of the Schrader N sands ( ~7082’ MD). With the surface casing shoe and the injection packer
set below the top of Schrader Bluff, injection fluids will be confined to the Schrader bluff sands.
Hilcorp requests a variance to 20 AAC 25.412.(b) for injection packer set greater than 200 feet
measured depth (~620’MD) from upper most injection on well M-201 (PTD # 222030).
Thank You,
Wyatt Rivard | Operations Engineer (PBU: J, Q, R, S, U, W pads)O: (907) 777-8547 | C: (509)670-8001 | wrivard@hilcorp.comHilcorp Alaska, LLC | Anchorage, AK 99503
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:James Lott - (C)
To:Regg, James B (OGC); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (OGC)
Cc:Joseph Engel; Monty Myers
Subject:Diverter Hilcorp Innovation 4-7-22
Date:Friday, April 8, 2022 12:59:26 PM
Attachments:Diverter Hilcorp 04-07-22.xlsx
James Lott
HILCORP Drilling Foreman
HILCORP INNOVATION Rig
PBU, North Slope Alaska
907-670-3094 (Office)
907-398-9069 (Cell)
Harmony 1006
jlott@hilcorp.com
jameslott352@yahoo.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
PBU M-201
PTD 2220300
Date: 4/7/2022 Development:X Exploratory:
Drlg Contractor:Rig No.Innovation AOGCC Rep:
Operator:Oper. Rep:
Field/Unit/Well No.:Rig Rep:
PTD No.:2220300 Rig Phone:
Rig Email:
MISCELLANEOUS:DIVERTER SYSTEM:
Location Gen.:P Well Sign:P Designed to Avoid Freeze-up?P
Housekeeping:P Drlg. Rig.P Remote Operated Diverter?P
Warning Sign P Misc:NA No Threaded Connections?P
24 hr Notice:P Vent line Below Diverter?P
ACCUMULATOR SYSTEM:Diverter Size:13 5/8 in.
Systems Pressure:3000 psig P Hole Size:12 1/4 in.
Pressure After Closure:1900 psig P Vent Line(s) Size:16 in.P
200 psi Recharge Time:19 Seconds P Vent Line(s) Length:215 ft.P
Full Recharge Time:52 Seconds P Closest Ignition Source:80 ft.P
Nitrogen Bottles (Number of):6 Outlet from Rig Substructure:199 ft.P
Avg. Pressure: 2367 psig P
Accumulator Misc:NA
Vent Line(s) Anchored:P
MUD SYSTEM:Visual Alarm Turns Targeted / Long Radius:P
Trip Tank:P P Divert Valve(s) Full Opening:P
Mud Pits:P P Valve(s) Auto & Simultaneous:
Flow Monitor:P P Annular Closed Time: 10 sec P
Mud System Misc:0 NA Knife Valve Open Time: 6 sec P
Diverter Misc:NA
GAS DETECTORS:Visual Alarm
Methane:P P
Hydrogen Sulfide:P P
Gas Detectors Misc:0 NA
Total Test Time:0.5 hrs Non-Compliance Items:0
Remarks:
Submit to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Diverter Systems Inspection Report
GENERAL INFORMATION
WaivedHilcorp
*All Diverter reports are due to the agency within 5 days of testing*
jlott@hilcorp.com
TEST DATA
Joel Sture
phoebe.brooks@alaska.gov
Hilcorp
Test on 5" Pipe Size
0
James Lott
0
670-3094
TEST DETAILS
jim.regg@alaska.gov
AOGCC.Inspectors@alaska.gov
PBU M-201
Form 10-425 (Revised 05/2021)2022-0407_Diverter_Hilcorp_Innovation_PBU_M-201
J. Regg; 4/8/2022
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Monty M Myers
Drilling Manager
Hilcorp North Slope, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Prudhoe Bay Field, Polaris Oil Pool, PBU M-201
Hilcorp North Slope, LLC
Permit to Drill Number: 222-030
Surface Location: 3415' FSL, 606' FEL, Sec. 01, T11N, R12E, UM, AK
Bottomhole Location: 1344' FSL, 56' FWL, Sec. 23, T12N, R12E, UM, AK
Dear Mr. Myers:
Enclosed is the approved application for the permit to drill the above referenced well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jeremy M. Price
Chair
DATED this ___ day of March, 2022.
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.03.24
14:18:09 -08'00'
D7\SHRI:RUN E3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVS F6SHFLI\LIZHOOLVSURSRVHGIRU
'ULOO /DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV
5HGULOO 5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH*DV
2SHUDWRU1DPH %RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU
%RQG1R
$GGUHVV 3URSRVHG'HSWK )LHOG3RROV
0'
79'
D/RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ 3URSHUW\'HVLJQDWLRQ
6XUIDFH
7RSRI3URGXFWLYH+RUL]RQ '15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH
7RWDO'HSWK $FUHVLQ3URSHUW\ 'LVWDQFHWR1HDUHVW3URSHUW\
E/RFDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$' .%(OHYDWLRQDERYH06/IW
'LVWDQFHWR1HDUHVW:HOO2SHQ
6XUIDFH[ \ =RQH
WR6DPH3RRO
'HYLDWHGZHOOV .LFNRIIGHSWK IHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJVHH$$&
0D[LPXP+ROH$QJOH GHJUHHV 'RZQKROH 6XUIDFH
+ROH &DVLQJ :HLJKW *UDGH &RXSOLQJ /HQJWK 0' 79' 0' 79'
'ULYHQ ;
6XUIDFH 6XUIDFH
/ 9DP
6XUIDFH 6XUIDFH
/ %7&
7LHEDFN / %7&
6XUIDFH 6XUIDFH
/ -)(%HDU
35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV
-XQNPHDVXUHG
79'
+\GUDXOLF)UDFWXUHSODQQHG" <HV 1R
$WWDFKPHQWV 3URSHUW\3ODW %236NHWFK 'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
'LYHUWHU6NHWFK 6HDEHG5HSRUW 'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
&RQWDFW1DPH -RH(QJHO
0RQW\0\HUV &RQWDFW(PDLOMHQJHO#KLOFRUSFRP
'ULOOLQJ0DQDJHU &RQWDFW3KRQH
'DWH
3HUPLWWR'ULOO $3,1XPEHU 3HUPLW$SSURYDO
1XPEHU'DWH
&RQGLWLRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV
6DPSOHVUHT
G<HV1R 0XGORJUHT
G<HV1R
+6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT
G<HV1R
6SDFLQJH[FHSWLRQUHT
G<HV1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
3RVWLQLWLDOLQMHFWLRQ0,7UHT
G<HV1R
$33529('%<
$SSURYHGE\ &200,66,21(5 7+(&200,66,21 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,QWHUPHGLDWH
$XWKRUL]HG1DPH
$SULO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH
GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
6XUIDFH
3HUIRUDWLRQ'HSWK79'IW
*/%)(OHYDWLRQDERYH06/IW
3HUIRUDWLRQ'HSWK0'IW
8QFHPHQWHG7LHEDFN
6OLGLQJ6OHHYHVZ([SDQGDEOH3DFNHUV
&RQGXFWRU6WUXFWXUDO
$XWKRUL]HG7LWOH
$XWKRUL]HG6LJQDWXUH
3URGXFWLRQ
/LQHU
/HQJWK&DVLQJ &HPHQW9ROXPH 0'6L]H
3OXJVPHDVXUHG
LQFOXGLQJVWDJHGDWD
6WJ/V[7V[
(IIHFW'HSWK0'IW (IIHFW'HSWK79'IW
&DVLQJ3URJUDP 7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
3(50,772'5,//
$$&
6WJ/V[7V[
)6/
):/6HF715(80$.
)6/
):/6HF715(80$.
&HQWHUSRLQW'ULYH6XLWH$QFKRUDJH$.
+LOFRUS1RUWK6ORSH//&
)6/
)(/6HF715(80$. $'/
3%80
3UXGKRH%D\)LHOG
6FKUDGHU%OXII2LO3RRO3RODULV
'HYHORSPHQW$UHD
&HPHQW4XDQWLW\FIRUVDFNV
&RPPLVVLRQ8VH2QO\
6HHFRYHUOHWWHUIRURWKHU
UHTXLUHPHQWV
)RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$&J
3.9.2022
By Samantha Carlisle at 9:02 am, Mar 10, 2022
'LJLWDOO\VLJQHGE\0RQW\00\HUV
'1FQ 0RQW\00\HUVF 86
R +LOFRUS$ODVND//&RX 7HFKQLFDO
6HUYLFHV$.'ULOOLQJ
HPDLO PP\HUV#KLOFRUSFRP
5HDVRQ,DPDSSURYLQJWKLVGRFXPHQW
'DWH
0RQW\0
0\HUV
3RODULV2LO3RRO
0*50$5
&2$6)'
'65
%23(WHVWWRSVL$QQXODUWRSVL
&DVLQJWHVWRIVXIDFHFDVLQJDQG),7GLJLWDOGDWDWR$2*&&
LPPHGLDWHO\XSRQSHUIRUPLQJWKH),7),7WREHUHYLHZHG
DQGDSSURYHGE\$2*&&VWDIIEHIRUHGULOOLQJDKHDG
0,77DQG0,7,$WREHZLWQHVVHGE\$2*&&7KLVDSSURYHG37'WREHDYDLODEOHDQGXWLOL]HGDWWKHZHOOVLWH
6)'
JLC 3/24/2022
3/24/22
Jeremy Price Digitally signed by Jeremy Price
Date: 2022.03.24 14:17:57 -08'00'
tĞůůEĂŵĞ W/ Wd ^ƚĂƚƵƐdŽƉŽĨKŝůWŽŽů;^KĂ͕DͿdŽƉŽĨKŝůWŽŽů;^KĂ͕dsͿdŽƉŽĨŵƚ;DͿ dŽƉŽĨŵƚ;dsͿŽŶĂů/ƐŽůĂƚŝŽŶŽŵŵĞŶƚƐ^Ͳϭϯ ϱϬͲϬϮϵͲϮϬϴϭϬͲϬϭͲϬϬ ϮϭϰͲϭϬϰ WƌŽĚƵĐĞƌ ϲϵϴϬΖ ϱϮϯϮΖ ϰϲϲϬΖ ϰϮϲϱΖ ůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϰϲϲϬΖǁŝƚŚh^/dŽŶϵͬϯϬͬϮϬϭϰ͘/ǀŝƐŚĂŬƉƌŽĚƵĐĞƌ͕ŶŽƚŽƉĞŶƚŽ^͘^ͲϭϭϬ ϱϬͲϬϮϵͲϮϯϬϯϬͲϬϬͲϬϬ ϮϬϭͲϭϮϵ ďĂŶĚŽŶĞĚ ϲϴϰϵΖ ϱϮϮϯΖ ϯϰϲϲΖ ϮϴϴϯΖ ůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϯϰϲϲǁŝƚŚh^/dŽŶϭͬϳͬϮϬϭϮ͘<ƵƉĂƌƵŬWΘΖĚ͕ŶŽƚŽƉĞŶƚŽ^͘^ͲϭϭϬ ϱϬͲϬϮϵͲϮϯϬϯϬͲϬϭͲϬϬ ϮϭϭͲϭϮϵ ďĂŶĚŽŶĞĚ ϲϭϬϲΖ ϱϭϵϵΖ ϰϭϰϬΖ ϯϯϵϴΖ ůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϰϭϰϬΖDǁŝƚŚh^/dŽŶϮͬϭϯͬϮϬϭϮ͘<ƵƉĂƌƵŬWΘΖĚ͕ŶŽƚŽƉĞŶƚŽ^͘^ͲϭϭϬ ϱϬͲϬϮϵͲϮϯϬϯϬͲϬϮͲϬϬ ϮϭϯͲϭϵϴ t'/ŶũĞĐƚŽƌ ϲϲϯϵΖ ϱϮϰϰΖ ϰϵϵϬΖ ϯϴϴϰΖůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϰϵϵϬΖDǁŝƚŚh^/dŽŶϮͬϴͬϮϬϭϰ͘<ƵƉĂƌƵŬŝŶũĞĐƚŽƌ͕ŶŽƚŽƉĞŶƚŽ^͘^Ͳϰϭ ϱϬͲϬϮϵͲϮϮϲϰϱͲϬϬͲϬϬ ϮϭϬͲϭϬϭ ďĂŶĚŽŶĞĚ ϲϱϱϳΖ ϱϭϵϳΖ ϯϮϮϴΖ ϮϵϲϴΖ ůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϯϮϮϴΖDǁŝƚŚh^/dŽŶϵͲϮϰͲϮϬϭϬ͘/ǀŝƐŚĂŬWΘΖĚ͕ŶŽƚŽƉĞŶƚŽ^͘^ͲϭϮϰ ϱϬͲϬϮϵͲϮϯϯϮϯͲϬϬͲϬϬ ϮϬϲͲϭϯϲ t'/ŶũĞĐƚŽƌ ϴϯϱϵΖ ϱϮϭϲΖ ϯϳϬϬΖ ϮϴϱϵΖ ůŽƐĞĚϳΗdKůŽŐŐĞĚĂƚϯϳϬϬΖDǁŝƚŚh^/dŽŶϭϭͬϴͬϮϬϬϲ͘<ƵƉĂƌƵŬŝŶũĞĐƚŽƌ͕ŶŽƚŽƉĞŶƚŽ^͘ƌĞĂŽĨZĞǀŝĞǁWhDͲϮϬϭŶŽƚŽƉĞŶƚŽ^͘ŶŽƚŽƉĞŶƚŽ^͘ŶŽƚŽƉĞŶƚŽ^͘ŶŽƚŽƉĞŶƚŽ^͘ŶŽƚŽƉĞŶƚŽ^͘ŶŽƚŽƉĞŶƚŽ^͘
3UXGKRH%D\:HVW
3%80
3HUPLWWR'ULOO$SSOLFDWLRQ
9HUVLRQ
7DEOHRI&RQWHQWV
:HOO6XPPDU\
0DQDJHPHQWRI&KDQJH,QIRUPDWLRQ
7XEXODU3URJUDP
'ULOO3LSH,QIRUPDWLRQ
,QWHUQDO5HSRUWLQJ5HTXLUHPHQWV
3ODQQHG:HOOERUH6FKHPDWLF
'ULOOLQJ&RPSOHWLRQ6XPPDU\
0DQGDWRU\5HJXODWRU\&RPSOLDQFH1RWLILFDWLRQV
58DQG3UHSDUDWRU\:RUN
18´0'LYHUWHU6\VWHP
'ULOO´+ROH6HFWLRQ
5XQ´6XUIDFH&DVLQJ
&HPHQW´6XUIDFH&DVLQJ
1''LYHUWHU18%23( 7HVW
'ULOO´+ROH6HFWLRQ
5XQ´,QMHFWLRQ/LQHU
5XQ´7LHEDFN
5XQ8SSHU&RPSOHWLRQ3RVW5LJ:RUN
,QQRYDWLRQ5LJ'LYHUWHU6FKHPDWLF
,QQRYDWLRQ5LJ%236FKHPDWLF
:HOOKHDG6FKHPDWLF
'D\V9V'HSWK
)RUPDWLRQ7RSV ,QIRUPDWLRQ
$QWLFLSDWHG'ULOOLQJ+D]DUGV
,QQRYDWLRQ5LJ/D\RXW
),73URFHGXUH
,QQRYDWLRQ5LJ&KRNH0DQLIROG6FKHPDWLF
&DVLQJ'HVLJQ
´+ROH6HFWLRQ0$63
6SLGHU3ORW1$'*RYHUQPHQWDO6HFWLRQV
6XUIDFH3ODW$V6WDNHG1$'
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
:HOO6XPPDU\
:HOO 3%8 0
3DG 3UXGKRH%D\ 0 3DG
3ODQQHG &RPSOHWLRQ7\SH ´,QMHFWLRQ
7DUJHW5HVHUYRLUV 6FKUDGHU %OXII 2%D 6DQG
3ODQQHG :HOO7'0'79' ¶ 0' ¶79'
3%7'0'79' ¶ 0' ¶79'
6XUIDFH/RFDWLRQ*RYHUQPHQWDO
)1/
)(/6HF 715(80$.
6XUIDFH/RFDWLRQ1$' ; <
7RSRI3URGXFWLYH+RUL]RQ
*RYHUQPHQWDO
)6/
):/6HF715(80$.
73+/RFDWLRQ1$' ; <
%+/*RYHUQPHQWDO
)6/
):/6HF 715(80$.
%+/1$' ; <
$)(1XPEHU
$)('ULOOLQJ'D\V
$)(&RPSOHWLRQ'D\V
0D[LPXP$QWLFLSDWHG3UHVVXUH
6XUIDFH SVLJ
0D[LPXP$QWLFLSDWHG3UHVVXUH
'RZQKROH5HVHUYRLU SVLJ
:RUN6WULQJ ´6 1&
,QQRYDWLRQ .%(OHYDWLRQDERYH06/ IW IW IW
*/(OHYDWLRQDERYH06/ IW
%23(TXLSPHQW ´[0$QQXODUHD´[05DPV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
0DQDJHPHQWRI&KDQJH,QIRUPDWLRQ
DSSURYHGLQDGYDQFHE\6)'
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
7XEXODU3URJUDP
+ROH
6HFWLRQ
2'LQ,'
LQ
'ULIW
LQ
&RQQ2'
LQ
:W
IW
*UDGH &RQQ %XUVW
SVL
&ROODSVH
SVL
7HQVLRQ
NOEV
&RQG ´ ´;:HOG
´´ ´´´ / 7;3
´ ´´´ / 9$0
7LHEDFN ´ / %7&
´ ´ /-)(%($5
7XELQJ ´ /-)(%($5
'ULOO3LSH,QIRUPDWLRQ
+ROH
6HFWLRQ
2'
LQ
,'LQ7-,'
LQ
7-2'
LQ
:W
IW
*UDGH &RQQ 08
0LQ
08
0D[
7HQVLRQ
NOEV
6XUIDFH
3URGXFWLRQ
´´´ ´ 6 '6 NOE
´´´ ´ 6 1& NOE
$OOFDVLQJZLOOEHQHZ36/PLOOLQVSHFWHGLQVSHFWLRQXSRQGHOLYHU\
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QWHUQDO5HSRUWLQJ5HTXLUHPHQWV
)LOORXWGDLO\GULOOLQJUHSRUWDQGFRVWUHSRUWRQ:HOO(]
x 5HSRUWFRYHUVRSHUDWLRQVIURPDPWRDP
x &OLFNRQRQHRIWKHWDEVDWWKHWRSWRVDYHGDWDHQWHUHG,I\RXFOLFNRQRQHRIWKHWDEVWRWKHOHIW
RIWKHGDWDHQWU\DUHD±WKLVZLOOQRWVDYHWKHGDWDHQWHUHGDQGZLOOQDYLJDWHWRDQRWKHUGDWDHQWU\
x (QVXUHWLPHHQWU\DGGVXSWRKRXUVWRWDO
x 7U\WRFDSWXUHDQ\RXWRIVFRSHZRUNDV1377KLVKHOSVODWHURQZKHQZHSXOOHQGRIZHOO
UHSRUWV
x (QWHUWKH0'DQG79'GHSWKV(9(5<'$<ZKHWKHU\RXDUHPDNLQJKROHRUQRW
$IWHUQRRQ8SGDWHV
x 6XEPLWDVKRUWRSHUDWLRQVXSGDWHHDFKZRUNGD\WR SPD]]ROLQL#KLOFRUSFRPPP\HUV#KLOFRUS
QDWKDQVSHUU\#KLOFRUSFRPMHQJHO#KLOFRUSFRPDQGMRVHSKODVWXIND#KLOFRUSFRP
,QWUDQHW+RPH3DJH0RUQLQJ8SGDWH
x 6XEPLWDVKRUWRSHUDWLRQVXSGDWHHDFKPRUQLQJE\DPRQWKHFRPSDQ\LQWUDQHWKRPHSDJH2Q
ZHHNHQGDQGKROLGD\VHQVXUHWRKDYHWKLVXSGDWHLQEHIRUHDP
(+6,QFLGHQW5HSRUWLQJ
x +HDOWKDQG6DIHW\1RWLI\(+6ILHOGFRRUGLQDWRU
x (QYLURQPHQWDO'ULOOLQJ(QYLURQPHQWDO&RRUGLQDWRU
x 1RWLI\'ULOOLQJ0DQDJHU 'ULOOLQJ(QJLQHHURQDOOLQFLGHQWV
x 6XEPLW+LOFRUS,QFLGHQWUHSRUWWRFRQWDFWVDERYHZLWKLQKUV
&DVLQJ7DOO\
x 6HQGILQDO³$V5XQ´&DVLQJWDOO\WR PP\HUV#KLOFRUSFRPMHQJHO#KLOFRUSFRP DQG
MRVHSKODVWXIND#KLOFRUSFRP
&DVLQJDQG&HPHQWUHSRUW
x 6HQGFDVLQJDQGFHPHQWUHSRUWIRUHDFKVWULQJRIFDVLQJWR PP\HUV#KLOFRUSFRP
MHQJHO#KLOFRUSFRP DQG MRVHSKODVWXIND#KLOFRUSFRP
+LOFRUS&RQWDFW/LVW
dŝƚůĞ EĂŵĞ tŽƌŬWŚŽŶĞ ŵĂŝů
ƌŝůůŝŶŐDĂŶĂŐĞƌ DŽŶƚLJDLJĞƌƐ ϵϬϳ͘ϳϳϳ͘ϴϰϯϭ ŵŵLJĞƌƐΛŚŝůĐŽƌƉ͘ĐŽŵ
ƌŝůůŝŶŐŶŐŝŶĞĞƌ :ŽĞŶŐĞů ϵϬϳ͘ϳϳϳ͘ϴϯϵϱ ũĞŶŐĞůΛŚŝůĐŽƌƉ͘ĐŽŵ
ƌŝůůŝŶŐŶŐŝŶĞĞƌ EĂƚĞ^ƉĞƌƌLJ ϵϬϳ͘ϳϳϳ͘ϴϰϱϬ ŶĂƚŚĂŶ͘ƐƉĞƌƌLJΛŚŝůĐŽƌƉ͘ĐŽŵ
ŽŵƉůĞƚŝŽŶŶŐŝŶĞĞƌ tLJĂƚƚZŝǀĂƌĚ ϵϬϳ͘ϳϳϳ͘ϴϱϰϳ ǁƌŝǀĂƌĚΛŚŝůĐŽƌƉ͘ĐŽŵ
'ĞŽůŽŐŝƐƚ <ĞǀŝŶĂƐƚŚĂŵ ϵϬϳ͘ϳϳϳ͘ϴϯϭϲ ŬĞĂƐƚŚĂŵΛŚŝůĐŽƌƉ͘ĐŽŵ
ZĞƐĞƌǀŽŝƌŶŐŝŶĞĞƌ DŝĐŚĂĞůDĂLJĨŝĞůĚ ϵϬϳ͘ϱϲϰ͘ϱϬϵϳ ŵŵĂLJĨŝĞůĚΛŚŝůĐŽƌƉ͘ĐŽŵ
ƌŝůůŝŶŐŶǀ͘ŽŽƌĚŝŶĂƚŽƌ <ĞĞŐĂŶ&ůĞŵŝŶŐ ϵϬϳ͘ϳϳϳ͘ϴϰϳϳ ŬĨůĞŵŝŶŐΛŚŝůĐŽƌƉ͘ĐŽŵ
,^DĂŶĂŐĞƌ >ĂƵƌĂ'ƌĞĞŶ ϵϬϳ͘ϳϳϳ͘ϴϯϭϰ ODJUHHQΛŚŝůĐŽƌƉ͘ĐŽŵ
ƌŝůůŝŶŐdĞĐŚ :ŽĞ>ĂƐƚƵĨŬĂ ϵϬϳ͘ϳϳϳ͘ϴϰϬϬ :ŽƐĞƉŚ͘>ĂƐƚƵĨŬĂΛŚŝůĐŽƌƉ͘ĐŽŵ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
ZĞǀŝƐĞĚLJ͗:E>ϯͬϵͬϮϬϮϮ
WZKWK^ ^,Dd/
WƌƵĚŚŽĞĂLJhŶŝƚ
tĞůů͗WhDͲϮϬϭ
>ĂƐƚŽŵƉůĞƚĞĚ͗d
Wd͗d
dсϭϵ͕ϴϴϳ͛;DͿͬdсϱ͕ϮϬϮ͛;dsͿ
ϮϬ͟
KƌŝŐ͘<ůĞǀ͗͘ϱϭ͘ϴ͛ͬ'>ůĞǀ͗͘Ϯϱ͘ϯ͛
ϵͲϱͬϴ͟
6HH
/LQHU
'HWDLO
Wdсϭϵ͕ϴϴϳ͛͛;DͿͬWdсϱ͕ϮϬϮ͛;dsͿ
´ µ(6¶
&HPHQWHU#
ц¶
^/E'd/>
^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ W&
ϮϬΗ ŽŶĚƵĐƚŽƌ ϭϮϵ͘ϱͬyϱϮͬtĞůĚ Eͬ ^ƵƌĨĂĐĞ ϭϭϬ͛ Eͬ
ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϰϳͬ>ͲϴϬͬsĂŵϮϭ ϴ͘ϲϴϭ ^ƵƌĨĂĐĞ Ϯ͕ϱϬϬ͛ Ϭ͘ϬϳϯϮ
ϵͲϱͬϴ͟ ^ƵƌĨĂĐĞ ϰϬͬ>ͲϴϬͬd ϴ͘ϴϯϱ Ϯ͕ϱϬϬ͛ ϳ͕ϴϮϬ͛ Ϭ͘Ϭϳϱϴ
ϳ͟ dŝĞďĂĐŬ Ϯϲͬ>ͲϴϬͬd ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϳ͕ϭϬϬ͛ Ϭ͘Ϭϯϴϯ
ϰͲϭͬϮ͟ >ŝŶĞƌ ϭϮ͘ϲͬ>ͲϴϬͬ:&ĞĂƌ ϯ͘ϵϱϴ ϳ͕ϭϬϬ͛ ϭϵ͕ϴϴϳ͛ Ϭ͘ϬϭϱϮ
dh/E'd/>
ϰͲϭͬϮΗ dƵďŝŶŐ ϭϮ͘ϲͬ>ͲϴϬͬsĂŵdŽƉ ϯ͘ϵϱϴ ^ƵƌĨĂĐĞ ϳ͕ϬϬϬ͛ Ϭ͘ϬϭϱϮ
KWE,K>ͬDEdd/>
ƌŝǀĞŶ ŽŶĚƵĐƚŽƌ
ϭϮͲϭͬϰΗ ^ƚŐϭʹ>ĞĂĚʹϳϰϵƐdžͬdĂŝůʹϯϵϱƐdž
^ƚŐϮʹ>ĞĂĚʹϲϳϯƐdžͬdĂŝůʹϮϲϴƐdž
ϴͲϭͬϮ͟ ĞŵĞŶƚůĞƐƐ>ŝŶĞƌ
t>>/E>/Ed/KEd/>
<KWΛϯϬϬ͛
ϵϬΣ,ŽůĞŶŐůĞсΛϴ͕ϮϬϬ͛D
dZΘt>>,
dƌĞĞ ĂŵĞƌŽŶϯϭͬϴΗϱDǁͬϰͲϭͬϭϲ͟ϱDĂŵĞƌŽŶtŝŶŐ
tĞůůŚĞĂĚ &Dϭϭ͟ϱ<džƐůŝƉůŽĐŬďŽƚƚŽŵǁͬ;ϮͿϮͲϭͬϭϲ͟ϱ<ŽƵƚƐ
'EZ>t>>/E&K
W/͗d
ŽŵƉůĞƚŝŽŶĂƚĞ͗d
:t>Zzd/>
EŽ͘ dŽƉDΎ /ƚĞŵ /
ϭ ϮϮϬϬ yEŝƉƉůĞ ϯ͘ϴϭϯ͟
Ϯ ϮϱϬϬ '>D ϯ͘ϴϯϯ͟
ϯ ϳϭϬϬ ϳ͟džϵͲϱͬϴ͟>ŝŶĞƌ,ĂŶŐĞƌǁͬdŝĞďĂĐŬ^ůĞĞǀĞ ϲ͘ϭϲϬ͟
ϰ ϳϭϬϬ >ŝŶĞƌdŽƉWĂĐŬĞƌ ϲ͘ϭϲϬ͟
ϱ ϳϭϯϬ yEŝƉƉůĞ ϯ͘ϴϭϯ͟
ϲ ϳϭϳϬ WƌŽĚƵĐƚŝŽŶWĂĐŬĞƌ ϯ͘ϴϲϱ͟
ϳ ϳϮϭϬ yEŝƉƉůĞ ϯ͘ϴϭϯ͟
ϴ ϳϮϱϬ t>' ϲ͘ϭϲϬ͟
ϵ ϳϯϬϬ ϳ͟džϰͲϭͬϮ͟yK ϯ͘ϵϱϴ͟
ΎůůĚĞƉƚŚƐĂƌĞĂƉƉƌŽdžŝŵĂƚĞĂŶĚĂƌĞƐƵďũĞĐƚƚŽĐŚĂŶŐĞďĂƐĞĚŽŶĂĐƚƵĂůĚƌŝůůĞĚ
ĚĞƉƚŚƐ͘
>ŝŶĞƌĞƚĂŝů
^ŝnjĞ ^W& dŽƉ;DͿ ƚŵ;DͿ dLJƉĞ
ϰͲϭͬϮ͟ ^>s ǀĞƌLJϱϬϬ͛ E^^ůŝĚŝŶŐ^ůĞĞǀĞƐ
ϰͲϭͬϮ͟ W<Z ǀĞƌLJϭϬϬϬ͛ tĞůůƚĞĐdžƉĂŶĚĂďůĞWĂĐŬĞƌ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
'ULOOLQJ&RPSOHWLRQ6XPPDU\
3%80LVDJUDVVURRWVLQMHFWRUSODQQHGWREHGULOOHGLQWKH6FKUDGHU%OXII2%DVDQGV0LVSDUWRID
PXOWLZHOOSURJUDPWDUJHWLQJWKH6FKUDGHU%OXIIVDQGRQ3%80SDG
7KHGLUHFWLRQDOSODQLV´VXUIDFHKROHDQG´VXUIDFHFDVLQJVHWLQWRWKHWRSRIWKH6FKUDGHU%OXII
2%DVDQG$Q´ODWHUDOVHFWLRQZLOOEHGULOOHG$´OLQHUZLOOEHUXQLQWKHRSHQKROHVHFWLRQ
IROORZHGE\D´WLHEDFNDQG´LQMHFWLRQWXELQJ7KLVZHOOZLOOQRWEHSUHSURGXFHGSULRUWREHLQJRQ
LQMHFWLRQ
7KH,QQRYDWLRQ5LJZLOOEHXVHGWRGULOODQGFRPSOHWHWKHZHOOERUH
'ULOOLQJRSHUDWLRQVDUHH[SHFWHGWRFRPPHQFHDSSUR[LPDWHO\$SULOSHQGLQJULJVFKHGXOH
6XUIDFHFDVLQJZLOOEHUXQWR¶0'¶79'DQGFHPHQWHGWRVXUIDFHYLDDVWDJHSULPDU\FHPHQW
MRE&HPHQWUHWXUQVWRVXUIDFHZLOOFRQILUP72&DWVXUIDFH,IFHPHQWUHWXUQVWRVXUIDFHDUHQRWREVHUYHG
QHFHVVDU\UHPHGLDODFWLRQZLOOWKHQEHGLVFXVVHGZLWK$2*&&DXWKRULWLHV
$OOFXWWLQJV PXGJHQHUDWHGGXULQJGULOOLQJRSHUDWLRQVZLOOEHKDXOHGWRRQHRIWZRORFDWLRQV
3ULPDU\3UXGKRH* ,RQ3DG
6HFRQGDU\WKH0LOQH3RLQW³%´SDG* ,IDFLOLW\
*HQHUDOVHTXHQFHRIRSHUDWLRQV
0,58,QQRYDWLRQ5LJWRZHOOVLWH
18 7HVW´'LYHUWHUDQG´GLYHUWHUOLQH
'ULOO´KROHWR7'RIVXUIDFHKROHVHFWLRQ5XQDQGFHPHQW´VXUIDFHFDVLQJ
1'GLYHUWHU18ZHOOKHDG18´0%23 7HVW
'ULOO´ODWHUDOWRZHOO7'
5XQ´SURGXFWLRQOLQHU
5XQ´WLHEDFN
5XQ8SSHU&RPSOHWLRQ
1'%23187UHH5'02
5HVHUYRLU(YDOXDWLRQ3ODQ
6XUIDFHKROH1RPXGORJJLQJ5HPRWHJHRORJLVW/:'*55HV
3URGXFWLRQ+ROH1RPXGORJJLQJ5HPRWHJHRORJLVW/:'*5$'5)RUJHRVWHHULQJ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
0DQGDWRU\5HJXODWRU\&RPSOLDQFH1RWLILFDWLRQV
5HJXODWRU\&RPSOLDQFH
(QVXUHWKDWDOOGULOOLQJDQGFRPSOHWLRQRSHUDWLRQVFRPSO\ZLWKDOODSSOLFDEOH$2*&&UHJXODWLRQV
2SHUDWLRQVVWDWHGLQWKLV37'DSSOLFDWLRQPD\EHDOWHUHGEDVHGRQVRXQGHQJLQHHULQJMXGJHPHQWDV
ZHOOERUHFRQGLWLRQVUHTXLUHEXWQR$2*&&UHJXODWLRQVZLOOEHYDULHGIURPZLWKRXWSULRUDSSURYDOIURP
WKH$2*&&,IDGGLWLRQDOFODULW\RUJXLGDQFHLVUHTXLUHGRQKRZWRFRPSO\ZLWKDVSHFLILFUHJXODWLRQ
GRQRWKHVLWDWHWRFRQWDFWWKH$QFKRUDJH'ULOOLQJ7HDP
x 5HYLHZDOOFRQGLWLRQVRIDSSURYDORIWKH37'RQWKHIRUP(QVXUHWKDWWKHFRQGLWLRQVRI
DSSURYDODUHFDSWXUHGLQVKLIWKDQGRYHUQRWHVXQWLOWKH\DUHH[HFXWHGDQGFRPSOLHGZLWK
x %23VVKDOOEHWHVWHGDWZHHNLQWHUYDOVGXULQJWKHGULOOLQJDQGFRPSOHWLRQRI 3%80
(QVXUHWRSURYLGH$2*&&KUVQRWLFHSULRUWRWHVWLQJ%23V
x 7KHLQLWLDOWHVWRI%23HTXLSPHQWZLOOEHWRSVL VXEVHTXHQWWHVWVRIWKH%23HTXLSPHQW
ZLOOEHWRSVLIRUPLQDQQXODUWRUDWHG:3SVLRQWKHKLJKWHVWIRULQLWLDO
DQGVXEVHTXHQWWHVWVConfirm that these test pressures match those specified on the APD.
x If the BOP is used to shut in on the well in a well control situation or control fluid flow from the
well bore, AOGCC is to be notified and we must test all BOP components utilized for well control
prior to the next trip into the wellbore. This pressure test will be charted same as the 14 day BOP
test.
x $OO$2*&&UHJXODWLRQVZLWKLQ$$&³3ULPDU\ZHOOFRQWUROIRUGULOOLQJGULOOLQJIOXLGSURJUDP
DQGGULOOLQJIOXLGV\VWHP´
x $OO$2*&&UHJXODWLRQVZLWKLQ$$&³6HFRQGDU\ZHOOFRQWUROIRUSULPDU\GULOOLQJDQG
FRPSOHWLRQEORZRXWSUHYHQWLRQHTXLSPHQWDQGGLYHUWHUUHTXLUHPHQWV´
o (QVXUHWKHGLYHUWHUYHQWOLQHLVDWOHDVW¶DZD\IURPSRWHQWLDOLJQLWLRQVRXUFHV
x (QVXUH$2*&&DSSURYHGGULOOLQJSHUPLWLVSRVWHGRQWKHULJIORRUDQGLQ&R0DQRIILFH
x &DVLQJSUHVVXUHWHVWFULWHULDLQ$$&H&DVLQJDQG&HPHQWLQJ“A casing pressure test
must be performed if BOPE is to be installed on a casing. The casing must be tested to hold a
minimum surface pressure equal to 50 percent of the casing internal yield pressure. The test
pressure must show stabilizing pressure and may not decline more than 10 percent within 30
minutes. The results of this test and any subsequent tests of the casing must be recorded as required
by 20 AAC 25.070(1)”.
$2*&&5HJXODWLRQ9DULDQFH5HTXHVWV
1RYDULDQFHVUHTXHVWHGDWWKLVWLPH
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
6XPPDU\RI,QQRYDWLRQ%23(TXLSPHQW 7HVW5HTXLUHPHQWV
+ROH6HFWLRQ (TXLSPHQW 7HVW3UHVVXUHSVL
´x ´0&7,$QQXODU%23Z´GLYHUWHUOLQH )XQFWLRQ7HVW2QO\
´
x ´[0&RQWURO7HFKQRORJ\,QF$QQXODU%23
x ´[0&RQWURO7HFKQRORJ\,QF'RXEOH*DWH
o %OLQGUDPLQEWPFDYLW\
x 0XGFURVVZ´[0VLGHRXWOHWV
x ´[0&RQWURO7HFKQRORJ\6LQJOHUDP
x ´[0&KRNH/LQH
x ´[0.LOOOLQH
x ´[0&KRNHPDQLIROG
x 6WDQGSLSHIORRUYDOYHVHWF
,QLWLDO7HVW
6XEVHTXHQW7HVWV
3ULPDU\FORVLQJXQLW&RQWURO7HFKQRORJ\,QF&7,VWDWLRQSVLJDOORQDFFXPXODWRUXQLW
3ULPDU\FORVLQJK\GUDXOLFVLVSURYLGHGE\DQHOHFWULFDOO\GULYHQWULSOH[SXPS6HFRQGDU\EDFNXSLVDQHOHFWULF
WULSOH[SXPSRQDGLIIHUHQWHOHFWULFDOFLUFXLWDQGHPHUJHQF\SUHVVXUHLVSURYLGHGE\ERWWOHGQLWURJHQ
7KHUHPRWHFORVLQJRSHUDWRUSDQHOVDUHORFDWHGLQWKHGRJKRXVHDQGRQDFFXPXODWRUXQLW
5HTXLUHG$2*&&1RWLILFDWLRQV
x :HOOFRQWUROHYHQW%23VXWLOL]HGWRVKXWLQWKHZHOOWRFRQWUROLQIOX[RIIRUPDWLRQIOXLGV
x KRXUVQRWLFHSULRUWRVSXG
x KRXUVQRWLFHSULRUWRWHVWLQJ%23V
x KRXUVQRWLFHSULRUWRFDVLQJUXQQLQJ FHPHQWRSHUDWLRQV
x $Q\RWKHUQRWLILFDWLRQVUHTXLUHGLQ$3'
5HJXODWRU\&RQWDFW,QIRUPDWLRQ
$2*&&
-LP5HJJ$2*&&,QVSHFWRU2(PDLOMLPUHJJ#DODVNDJRY
9LFWRULD/RHSS3HWUROHXP(QJLQHHU2(PDLO9LFWRULDORHSS#DODVNDJRY
0HO5L[VH3HWUROHXP(QJLQHHU2&(PDLOPHOYLQUL[VH#DODVNDJRY
3ULPDU\&RQWDFWIRU2SSRUWXQLW\WRZLWQHVV$2*&&,QVSHFWRUV#DODVNDJRY
7HVW,QVSHFWLRQQRWLILFDWLRQVWDQGDUGL]DWLRQIRUPDWKWWSGRDDODVNDJRYRJFIRUPV7HVW:LWQHVV1RWLIKWPO
1RWLILFDWLRQ(PHUJHQF\3KRQH'XULQJQRUPDO%XVLQHVV+RXUV
1RWLILFDWLRQ(PHUJHQF\3KRQH2XWVLGHQRUPDO%XVLQHVV+RXUV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
58DQG3UHSDUDWRU\:RUN
0ZLOOXWLOL]HD´FRQGXFWRURQ0SDG(QVXUHWRUHYLHZDWWDFKHGVXUIDFHSODWDQGPDNH
VXUHULJLVRYHUDSSURSULDWHFRQGXFWRU
(QVXUH37'&2$VDQGGULOOLQJSURJUDPDUHSRVWHGLQWKHULJRIILFHDQGRQWKHULJIORRU
,QVWDOOODQGLQJULQJ
,QVXUH´QLSSOHVDUHLQVWDOOHGRQRSSRVLWHVLGHVRIWKHFRQGXFWRUZLWKEDOOYDOYHVRQHDFK
/HYHOSDGDQGHQVXUHHQRXJKURRPIRUOD\RXWRIULJIRRWSULQWDQG58
5LJPDWIRRWSULQWRIULJ
0,58,QQRYDWLRQ(QVXUHULJLVFHQWHUHGRYHUFRQGXFWRUWRSUHYHQWDQ\ZHDUWR%23(RU
ZHOOKHDG
0XGORJJHUV:,//127EHXVHGRQHLWKHUKROHVHFWLRQ
0L[VSXGPXGIRU´VXUIDFHKROHVHFWLRQ(QVXUHPXGWHPSHUDWXUHVDUHFRROq)
x &ROGPXGWHPSVDUHQHFHVVDU\WRPLWLJDWHK\GUDWHEUHDNRXWDOWKRXJKK\GUDWHVDUH127
H[SHFWHGDW0SDG
(QVXUH´OLQHUVLQPXGSXPSV
x :KLWH6WDU4XDWWUR+3PXGSXPSVDUHUDWHGDWSVLJSP#VSP#
YROXPHWULFHIILFLHQF\
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
18´0'LYHUWHU6\VWHP
18´&7,%23VWDFNLQGLYHUWHUFRQILJXUDWLRQ'LYHUWHU6FKHPDWLFDWWDFKHGWRSURJUDP
x 18´[´'6$
x 18´0GLYHUWHU³7´
x 18.QLIHJDWH ´GLYHUWHUOLQH
x (QVXUHGLYHUWHU58FRPSOLHVZLWK$2*&&UHJ$$&&
x 'LYHUWHUOLQHPXVWEHIWIURPQHDUHVWLJQLWLRQVRXUFH
x 3ODFHGULSEHUPDWWKHHQGRIGLYHUWHUOLQH
x 8WLOL]HGH[WHQVLRQVLIQHHGHG
1RWLI\$2*&&ZLWKKRXUQRWLFHWRZLWQHVV)XQFWLRQWHVWGLYHUWHU
x (QVXUHWKDWWKHNQLIHJDWHDQGDQQXODUDUHRSHUDWHGRQWKHVDPHFLUFXLWVRWKDWNQLIHJDWHRSHQV
SULRUWRDQQXODUFORVXUH
x (QVXUHWKDWWKHDQQXODUFORVHVLQOHVVWKDQVHFRQGV$3,6WDQGDUGUGHGLWLRQ0DUFK
VHFWLRQIRUSDFNLQJHOHPHQW,'OHVVWKDQRUHTXDOWR´
(QVXUHWRVHWXSDFOHDUO\PDUNHG³ZDUQLQJ]RQH´LVHVWDEOLVKHGRQHDFKVLGHDQGDKHDGRIWKH
YHQWOLQHWLS³:DUQLQJ=RQH´PXVWLQFOXGH
x $SURKLELWLRQRQYHKLFOHSDUNLQJ
x $SURKLELWLRQRQLJQLWLRQVRXUFHVRUUXQQLQJHTXLSPHQW
x $SURKLELWLRQRQVWDJHGHTXLSPHQWRUPDWHULDOV
x 5HVWULFWLRQRIWUDIILFWRHVVHQWLDOIRRWRUYHKLFOHWUDIILFRQO\
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
5LJ 'LYHUWHU2ULHQWDWLRQ
x 0D\FKDQJHRQORFDWLRQ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
'ULOO´+ROH6HFWLRQ
38´GLUHFWLRQDOGULOOLQJDVVHPEO\
x (QVXUH%+$FRPSRQHQWVKDYHEHHQLQVSHFWHGSUHYLRXVO\
x 'ULIWDQGFDOLSHUDOOFRPSRQHQWVEHIRUH089LVXDOO\YHULI\QRGHEULVLQVLGHFRPSRQHQWV
WKDWFDQQRWEHGULIWHG
x (QVXUH7)RIIVHWLVPHDVXUHGDFFXUDWHO\DQGHQWHUHGFRUUHFWO\LQWRWKH0:'VRIWZDUH
x &RQVLGHUUXQQLQJD8%+2VXEIRUZLUHOLQHJ\UR*:'ZLOOEHWKHSULPDU\J\URWRRO
x +DYH''UXQK\GUDXOLFVFDOFXODWLRQVRQVLWHWRHQVXUHRSWLPXPQR]]OHVL]LQJ
x 'ULOOVWULQJZLOOEH´6
x 5XQDVROLGIORDWLQWKHVXUIDFHKROHVHFWLRQ
%HJLQGULOOLQJRXWIURP´FRQGXFWRUDWUHGXFHGIORZUDWHVWRDYRLGEURDFKLQJWKHFRQGXFWRU
x &RQVLGHUXVLQJDWUDVKELWWRFOHDQRXWFRQGXFWRUWRPLWLJDWHSRWHQWLDOGDPDJHIURPGHEULVLQ
FRQGXFWRU
'ULOO´KROHVHFWLRQWRVHFWLRQ7'LQWKH6FKUDGHU2%DVDQG&RQILUPWKLVVHWWLQJGHSWK
ZLWKWKH*HRORJLVWDQG'ULOOLQJ(QJLQHHUZKLOHGULOOLQJWKHZHOO
x 0RQLWRUWKHDUHDDURXQGWKHFRQGXFWRUIRUDQ\VLJQVRIEURDFKLQJ,IEURDFKLQJLVREVHUYHG
6WRSGULOOLQJRUFLUFXODWLQJLPPHGLDWHO\QRWLI\'ULOOLQJ(QJLQHHU
x (IIRUWVVKRXOGEHPDGHWRPLQLPL]HGRJOHJVLQWKHVXUIDFHKROH.HHS'/6GHJ
x +ROGDVDIHW\PHHWLQJZLWKULJFUHZVWRGLVFXVV
x &RQGXFWRUEURDFKLQJRSVDQGPLWLJDWLRQSURFHGXUHV
x :HOOFRQWUROSURFHGXUHVDQGULJHYDFXDWLRQ
x )ORZUDWHVKROHFOHDQLQJPXGFRROLQJHWF
x 3XPSVZHHSVDQGPDLQWDLQPXGUKHRORJ\WRHQVXUHHIIHFWLYHKROHFOHDQLQJ
x .HHSPXGDVFRRODVSRVVLEOHWRNHHSIURPZDVKLQJRXWSHUPDIURVW
x 3XPSDWJSP0RQLWRUVKDNHUVFORVHO\WRHQVXUHVKDNHUVFUHHQVDQGUHWXUQOLQHVFDQ
KDQGOHWKHIORZUDWH
x 7KHUHKDYHEHHQµGLUHFWLRQDOGHDG]RQHV¶QRWHGLQ3%:'LUHFWLRQDOSODQKDVDEXLOGXSLQ
'/6IURP±WRDOORZJUDGXDOEXLOG,ISRVVLEOHJHWDKHDGRIEXLOGUDWHVZKLOHVWLOO
PHHWLQJWDQJHQWKROGWDUJHW
x (QVXUHWRQRWRXWGULOOKROHFOHDQLQJFDSDFLW\SHUIRUPFOHDQXSF\FOHVRUUHGXFH523LI
SDFNRIIVLQFUHDVHLQSXPSSUHVVXUHRUFKDQJHVLQKRRNORDGDUHVHHQ
x 6ORZLQRXWRIVOLSVDQGZKLOHWULSSLQJWRNHHSVZDEDQGVXUJHSUHVVXUHVORZ
x (QVXUHVKDNHUVDUHIXQFWLRQLQJSURSHUO\&KHFNIRUKROHVLQVFUHHQVRQFRQQHFWLRQV
x +DYHWKHIORZOLQHMHWVKRRNHGXSDQGEHUHDG\WRMHWWKHIORZOLQHDWWKHILUVWVLJQRISHD
JUDYHOFOD\EDOOLQJRUSDFNLQJRII
x $GMXVW0:DQGYLVFRVLW\DVQHFHVVDU\WRPDLQWDLQKROHVWDELOLW\HQVXUH0:LVDWDDW
EDVHRISHUPDQGDW7'
x 3HUIRUPJ\URVXUYH\VXQWLOFOHDQ0:'VXUYH\VDUHVHHQ7DNH0:'VXUYH\VHYHU\VWDQG
GULOOHG
x *DVK\GUDWHVDUHQRWSUHVHQWDW3%80SDG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
x 7DNH0:'DQG*:'VXUYH\VHYHU\VWDQGXQWLOPDJQHWLFLQWHUIHUHQFHFOHDQVXS$IWHU
0:'VXUYH\VVKRZFOHDQPDJQHWLFVRQO\WDNH0:'VXUYH\V
x 6XUIDFH+ROH$&
x 7KHUHDUHQRZHOOVZLWKDFOHDUDQFHIDFWRURI
´KROHPXGSURJUDPVXPPDU\
x 'HQVLW\:HLJKWLQJPDWHULDOWREHXVHGIRUWKHKROHVHFWLRQZLOOEHEDULWH$GGLWLRQDO
EDULWHRUVSLNHIOXLGZLOOEHRQORFDWLRQWRZHLJKWXSWKHDFWLYHV\VWHPSSJDERYH
KLJKHVWDQWLFLSDWHG0::HZLOOVWDUWZLWKDVLPSOHJHO):VSXGPXGDWSSJDQG
7'ZLWKSSJ0:IRUIUHHJDVDQGK\GUDWHVEDVHGXSRQRIIVHWZHOOV
'HSWK,QWHUYDO 0:SSJ
6XUIDFH±%DVH3HUPDIURVW
%DVH3HUPDIURVW7' )RU+\GUDWHV)UHH*DVEDVHGRQRIIVHW
ZHOOV
x 3976\VWHP397ZLOOEHXVHGWKURXJKRXWWKHGULOOLQJDQGFRPSOHWLRQSKDVH5HPRWH
PRQLWRULQJVWDWLRQVZLOOEHDYDLODEOHDWWKHGULOOHU¶VFRQVROH&R0DQRIILFH7RROSXVKHU
RIILFHDQGPXGORJJHUVRIILFH
x 5KHRORJ\$TXDJHODQG%DUD]DQ'VKRXOGEHXVHGWRPDLQWDLQUKHRORJ\%HJLQV\VWHP
ZLWKD<3EXWUHGXFHWKLVRQFHFOD\VDUHHQFRXQWHUHG0DLQWDLQDPLQLPXP<3DW
DOOWLPHVZKLOHGULOOLQJ%HSUHSDUHGWRLQFUHDVHWKH<3LIKROHFOHDQLQJEHFRPHVDQLVVXH
x )OXLG/RVV'(;75,'DQGRU3$&/VKRXOGEHXVHGIRUILOWUDWHFRQWURO%DFNJURXQG
/&0SSEWRWDO%$5$&$5%V%$52),%5(67((/6($/VFDQEHXVHGLQWKH
V\VWHPZKLOHGULOOLQJWKHVXUIDFHLQWHUYDOWRSUHYHQWORVVHVDQGVWUHQJWKHQWKHZHOOERUH
x :HOOERUHDQGPXGVWDELOLW\$GGLWLRQVRI&21'(735(0,;'5,/16/,'(DUH
UHFRPPHQGHGWRUHGXFHWKHLQFLGHQFHRIELWEDOOLQJDQGVKDNHUEOLQGLQJZKHQSHQHWUDWLQJ
WKHKLJKFOD\FRQWHQWVHFWLRQVRIWKH6DJDYDQLUNWRNDQGWKHKHDY\RLOVHFWLRQVRIWKH
8*18$0DLQWDLQWKHS+LQWKH±UDQJHZLWKFDXVWLFVRGD'DLO\DGGLWLRQVRI
$/'$&,'(*;&,'(0867EHPDGHWRFRQWUROEDFWHULDODFWLRQ
x &DVLQJ5XQQLQJ5HGXFHV\VWHP<3ZLWK'(6&2DVUHTXLUHGIRUUXQQLQJFDVLQJDV
DOORZHGGRQRWMHRSDUGL]HKROHFRQGLWLRQV5XQFDVLQJFDUHIXOO\WRPLQLPL]HVXUJHDQG
VZDESUHVVXUHV5HGXFHWKHV\VWHPUKHRORJ\RQFHWKHFDVLQJLVODQGHGWRD<3
FKHFNZLWKWKHFHPHQWHUVWRVHHZKDW<3YDOXHWKH\KDYHWDUJHWHG
6\VWHP7\SH±SSJ3UH+\GUDWHG$TXDJHOIUHVKZDWHUVSXGPXG
3URSHUWLHV
6HFWLRQ 'HQVLW\ 9LVFRVLW\ 3ODVWLF9LVFRVLW\ <LHOG3RLQW $3,)/ S+ 7HPS
6XUIDFH ± ±)
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
6\VWHP)RUPXODWLRQ*HO):VSXGPXG
3URGXFW &RQFHQWUDWLRQ
)UHVK:DWHU
VRGD$VK
$48$*(/
FDXVWLFVRGD
%$5$=$1'
%$52,'
3$&/'(;75,'/7
$/'$&,'(*
EEO
SSE
SSE
SSE±S+
DVQHHGHG
DVUHTXLUHGIRU±SSJ
LIUHTXLUHGIRU)/
SSE
$W7'38VWDQGVRIIERWWRPWRDYRLGZDVKLQJRXWWKHKROHDW7'&%8SXPSWDQGHP
VZHHSVDQGGURSYLVFRVLW\2EVHUYHZHOOIRUIORZ
5,+WRERWWRPSURFHHGWR%522+WR+:'3
x 3XPSDWIXOOGULOOUDWHJSPDQGPD[LPL]HURWDWLRQ
x 3XOOVORZO\±IWPLQXWHDGMXVWDVGLFWDWHGE\KROHFRQGLWLRQV
x 0RQLWRUZHOOIRUDQ\VLJQVRISDFNLQJRIIRUORVVHV
x +DYHWKHIORZOLQHMHWVKRRNHGXSDQGEHUHDG\WRMHWWKHIORZOLQHDWWKHILUVWVLJQRIFOD\
EDOOLQJ
x ,IIORZUDWHVDUHUHGXFHGWRFRPEDWRYHUORDGHGVKDNHUVIORZOLQHVWRSEDFNUHDPLQJXQWLO
SDUDPHWHUVDUHUHVWRUHG
722+DQG/'%+$
1RRSHQKROHORJJLQJSURJUDPSODQQHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
5XQ´6XUIDFH&DVLQJ
58DQGSXOOZHDUEXVKLQJ
58:HDWKHUIRUG´FDVLQJUXQQLQJHTXLSPHQW&57 7RQJV
x (QVXUH´%7&[1&DQG9$0[1&;2RQULJIORRUDQG08WR)269
x 8VH %2/WKUHDGFRPSRXQG'RSHSLQHQGRQO\ZSDLQWEUXVK
x 58RI&57LIKROHFRQGLWLRQVUHTXLUH
x 58DILOOXSWRROWRILOOFDVLQJZKLOHUXQQLQJLIWKH&57LVQRWXVHG
x (QVXUHDOOFDVLQJKDVEHHQGULIWHGWR´RQWKHORFDWLRQSULRUWRUXQQLQJ
x 7RS¶RIFDVLQJGULIW´
x $FWXDOGHSWKWREHGHSHQGHQWXSRQEDVHRISHUPDIURVWDQGVWDJHWRRO
x %HVXUHWRFRXQWWKHWRWDORIMRLQWVRQWKHORFDWLRQEHIRUHUXQQLQJ
x .HHSKROHFRYHUHGZKLOH58FDVLQJWRROV
x 5HFRUG2'¶V,'¶VOHQJWKV61¶VRIDOOFRPSRQHQWVZYHQGRU PRGHOLQIR
38VKRHMRLQWYLVXDOO\YHULI\QRGHEULVLQVLGHMRLQW
&RQWLQXH08 WKUHDGORFNLQJ¶VKRHWUDFNDVVHPEO\FRQVLVWLQJRI
´)ORDW6KRH
MRLQW±´&HQWUDOL]HUV¶IURPHDFKHQGZVWRSULQJV
MRLQW ±´ &HQWUDOL]HUPLGMRLQWZVWRSULQJ
´)ORDW&ROODUZ6WDJH&HPHQWHU%\SDVV%DIIOHµ7RS+DW¶
MRLQW±´&HQWUDOL]HUPLGMRLQWZLWKVWRSULQJ
´+(6%DIIOH$GDSWRU
x (QVXUHE\SDVVEDIIOHLVFRUUHFWO\LQVWDOOHGRQWRSRIIORDWFROODU
x (QVXUHSURSHURSHUDWLRQRIIORDWHTXLSPHQWZKLOHSLFNLQJXS
x (QVXUHWRUHFRUG61¶VRIDOOIORDWHTXLSPHQWDQGVWDJHWRROFRPSRQHQWV
7KLVHQGXS
%\SDVV%DIIOH
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
)ORDWHTXLSPHQWDQG6WDJHWRROHTXLSPHQWGUDZLQJV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&RQWLQXHUXQQLQJ´VXUIDFHFDVLQJ
x )LOOFDVLQJZKLOHUXQQLQJXVLQJILOOXSOLQHRQULJIORRU
x 8VH %2/WKUHDGFRPSRXQG'RSHSLQHQGRQO\ZSDLQWEUXVK
x &HQWUDOL]DWLRQ
x %RZVSULQJ&HQWUDOL]HUVRQO\
x FHQWUDOL]HUHYHU\MRLQWWRa¶0'IURPVKRH
x FHQWUDOL]HUHYHU\MRLQWVWRa¶DERYHVKRH7RSRI/RZHVW8JQX
x 9HULI\GHSWKRIORZHVW8JQXZDWHUVDQGIRULVRODWLRQZLWK*HRORJLVW
x 8WLOL]HDFROODUFODPSXQWLOZHLJKWLVVXIILFLHQWWRNHHSVOLSVVHWSURSHUO\
x %UHDNFLUFXODWLRQSULRUWRUHDFKLQJWKHEDVHRIWKHSHUPDIURVWLIFDVLQJUXQLQGLFDWHVSRRU
KROHFRQGLWLRQV
x $Q\SDFNLQJRIIZKLOHUXQQLQJFDVLQJVKRXOGEHWUHDWHGDVDPDMRUSUREOHP,WLVSUHIHUDEOH
WR32+ZLWKFDVLQJDQGFRQGLWLRQKROHWKDQWRULVNQRWJHWWLQJFHPHQWUHWXUQVWRVXUIDFH
,QVWDOOWKH+DOOLEXUWRQ7\SH+(6,,6WDJHWRROVRWKDWLWLVSRVLWLRQHGDWOHDVW¶79'EHORZ
WKHSHUPDIURVWa¶0'DFWXDOGHSWKEDVHGXSRQEDVHRISHUPDIURVW
x ,QVWDOOFHQWUDOL]HUVRYHUFRXSOLQJVRQMRLQWVEHORZDQGMRLQWVDERYHVWDJHWRRO
x 'RQRWSODFHWRQJVRQ(6FHPHQWHUWKLVFDQFDXVHGDPDJHGWRWKHWRRO
x (QVXUHWRROLVSLQQHGZLWKRSHQLQJVKHDUSLQV7KLVZLOODOORZWKHWRROWRRSHQDWSVL
´/9$00DNH8S7RUTXHV
&DVLQJ2' 0LQLPXP 2SWLPXP 0D[LPXP
´ IWOEV IWOEV IWOEV
´/7;30DNH8S7RUTXHV
&DVLQJ2' 0LQLPXP 2SWLPXP 0D[LPXP
´IWOEV IWOEV IWOEV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&RQWLQXHUXQQLQJ´VXUIDFHFDVLQJ
x &HQWUDOL]HUVFHQWUDOL]HUHYHU\UGMRLQWWR¶IURPVXUIDFH
x )LOOFDVLQJZKLOHUXQQLQJXVLQJILOOXSOLQHRQULJIORRU
x 8VH%2/WKUHDGFRPSRXQG'RSHSLQHQGRQO\ZSDLQWEUXVK
x &HQWUDOL]DWLRQ
o FHQWUDOL]HUHYHU\MRLQWVWREDVHRIFRQGXFWRU
7KHODVW¶RI´ZLOOEHIURP¶WR6XUIDFH
x $FWXDOOHQJWKRIPD\FKDQJHGXHWRGHSWKRISHUPDIURVWDVGULOOHG
x (QVXUHGULIWHGWR´
:DWFKGLVSODFHPHQWFDUHIXOO\DQGDYRLGVXUJLQJWKHKROH6ORZGRZQUXQQLQJVSHHGLI
QHFHVVDU\
6ORZLQDQGRXWRIVOLSV
38ODQGLQJMRLQWDQG08WRFDVLQJVWULQJ3RVLWLRQWKHFDVLQJVKRH¶IURP7'6WUDSWKH
ODQGLQJMRLQWSULRUWRWKHFDVLQJMREDQGPDUNWKHMRLQWDWIWLQWHUYDOVWRXVHDVDUHIHUHQFH
ZKHQJHWWLQJWKHFDVLQJRQGHSWK
/RZHUFDVLQJWRVHWWLQJGHSWK&RQILUPPHDVXUHPHQWV
+DYHVOLSVVWDJHGLQFHOODUDORQJZLWKQHFHVVDU\HTXLSPHQWIRUWKHRSHUDWLRQ
&LUFXODWHDQGFRQGLWLRQPXGWKURXJK&575HGXFH<3WRWRKHOSHQVXUHVXFFHVVRIFHPHQW
MRE(QVXUHDGHTXDWHDPRXQWVRIFROG08ZDWHUDUHDYDLODEOHWRDFKLHYHWKLV,ISRVVLEOH
UHFLSURFDWHFDVLQJVWULQJZKLOHFRQGLWLRQLQJPXG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&HPHQW´6XUIDFH&DVLQJ
+ROGDSUHMREVDIHW\PHHWLQJRYHUWKHXSFRPLQJFHPHQWRSHUDWLRQV0DNHURRPLQSLWVIRU
YROXPHJDLQHGGXULQJFHPHQWMRE(QVXUHDGHTXDWHFHPHQWGLVSODFHPHQWYROXPHDYDLODEOHDV
ZHOO(QVXUHPXG ZDWHUFDQEHGHOLYHUHGWRWKHFHPHQWLQJXQLWDWDFFHSWDEOHUDWHV
x +RZWRKDQGOHFHPHQWUHWXUQVDWVXUIDFH(QVXUHYDFWUXFNVDUHRQVWDQGE\DQGUHDG\WR
DVVLVW
x :KLFKSXPSVZLOOEHXWLOL]HGIRUGLVSODFHPHQWDQGKRZIOXLGZLOOEHIHGWRGLVSODFHPHQW
SXPS
x (QVXUHDGHTXDWHDPRXQWVRIZDWHUIRUPL[IOXLGLVKHDWHGDQGDYDLODEOHLQWKHZDWHUWDQNV
x 3RVLWLRQVDQGH[SHFWDWLRQVRISHUVRQQHOLQYROYHGZLWKWKHFHPHQWLQJRSHUDWLRQ
L ([WUDKDQGVLQWKHSLWVWRVWUDSGXULQJWKHFHPHQWMREWRLGHQWLI\DQ\ORVVHV
x 5HYLHZWHVWUHSRUWVDQGHQVXUHSXPSWLPHVDUHDFFHSWDEOH
x &RQGXFWYLVXDOLQVSHFWLRQRIDOOKDUGOLQHVDQGFRQQHFWLRQVXVHGWRURXWHVOXUU\WRULJIORRU
'RFXPHQWHIILFLHQF\RIDOOSRVVLEOHGLVSODFHPHQWSXPSVSULRUWRFHPHQWMRE
)OXVKWKURXJKFHPHQWSXPSDQGWUHDWLQJLURQIURPSXPSWRULJIORRUWRWKHVKDNHUV7KLVZLOO
KHOSHQVXUHDQ\GHEULVOHIWLQWKHFHPHQWSXPSRUWUHDWLQJLURQZLOOQRWEHSXPSHGGRZQKROH
58FHPHQWOLQHLIQRWDOUHDG\GRQHVR&RPSDQ\5HSWRZLWQHVVORDGLQJRIWKHWRSDQG
ERWWRPSOXJVWRHQVXUHGRQHLQFRUUHFWRUGHU
)LOOVXUIDFHFHPHQWOLQHVZLWKZDWHUDQGSUHVVXUHWHVW
3XPSUHPDLQLQJEEOVSSJWXQHGVSDFHU
'URSERWWRPSOXJIOH[LEOHE\SDVVSOXJ±+(&UHSWRZLWQHVV0L[DQGSXPSFHPHQWSHUEHORZ
FDOFXODWLRQVIRUWKHVWVWDJHFRQILUPDFWXDOFHPHQWYROXPHVZLWKFHPHQWHUDIWHU7'LVUHDFKHG
&HPHQWYROXPHEDVHGRQDQQXODUYROXPHRSHQKROHH[FHVV-REZLOOFRQVLVWRIOHDG
WDLO72&EURXJKWWRVWDJHWRRO
(VWLPDWHGVW6WDJH7RWDO&HPHQW9ROXPH
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&HPHQW6OXUU\'HVLJQVW6WDJH&HPHQW-RE
$WWHPSWWRUHFLSURFDWHFDVLQJGXULQJFHPHQWSXPSLQJLIKROHFRQGLWLRQVDOORZ:DWFK
UHFLSURFDWLRQ38DQG62ZHLJKWVLIWKHKROHJHWV³VWLFN\´FHDVHSLSHUHFLSURFDWLRQDQGFRQWLQXH
ZLWKWKHFHPHQWMRE
$IWHUSXPSLQJFHPHQWGURSWRSSOXJ6KXWRIISOXJDQGGLVSODFHFHPHQWZLWKVSXGPXGRXWRI
PXGSLWVVSRWWLQJZDWHUDFURVVWKH+(&VWDJHFHPHQWHU
x (QVXUHYROXPHVSXPSHGDQGYROXPHVUHWXUQHGDUHGRFXPHQWHGDQGFRQVWDQWFRPPXQLFDWLRQ
EHWZHHQPXGSLWV+(&5HSDQG+(6&HPHQWHUVGXULQJWKHHQWLUHMRE
(QVXUHULJSXPSLVXVHGWRGLVSODFHFHPHQW'LVSODFHPHQWFDOFXODWLRQVKDYHSURYHQWREHYHU\
DFFXUDWHXVLQJESV´OLQHUVIRUWKH4XDWWURSXPSRXWSXW7RRSHUDWHWKHVWDJHWRRO
K\GUDXOLFDOO\WKHSOXJPXVWEHEXPSHG
'LVSODFHPHQWFDOFXODWLRQ
¶[ESI¶¶¶[ESI EEOV
EEOVRIWXQHGVSDFHUWREHOHIWEHKLQGVWDJHWRROIRUSUHYHQWLQJRIFRQWDPLQDWLRQRI
FHPHQWLQWKHDQQXOXV
0RQLWRUUHWXUQVFORVHO\ZKLOHGLVSODFLQJFHPHQW$GMXVWSXPSUDWHLIORVVHVDUHVHHQDWDQ\
SRLQWGXULQJWKHMRE%HSUHSDUHGWRSXPSRXWIOXLGIURPFHOODU+DYHEODFNZDWHUDYDLODEOHWR
FRQWDPLQDWHDQ\FHPHQWVHHQDWVXUIDFH
,ISOXJLVQRWEXPSHGDWFDOFXODWHGVWURNHVGRXEOHFKHFNYROXPHVDQGFDOFXODWLRQV2YHU
GLVSODFHE\QRPRUHWKDQRIVKRHWUDFNYROXPHEEOVEHIRUHFRQVXOWLQJZLWK'ULOOLQJ
(QJLQHHU
,ISOXJLVQRWEXPSHGFRQVXOWZLWK'ULOOLQJ(QJLQHHU(QVXUHWKHIUHHIDOOVWDJHWRRORSHQLQJ
SOXJLVDYDLODEOHLIQHHGHG7KLVLVWKHEDFNXSRSWLRQWRRSHQWKHVWDJHWRROLIWKHSOXJVDUHQRW
EXPSHG
%XPSWKHSOXJZLWKSVLRYHUGLVSODFHPHQWSUHVVXUH%OHHGRIISUHVVXUHDQGFRQILUPIORDWV
DUHKROGLQJ,IIORDWVGRQRWKROGSUHVVXUHXSVWULQJWRILQDOFLUFXODWLQJSUHVVXUHDQGKROGXQWLO
FHPHQWLVVHW0RQLWRUSUHVVXUHEXLOGXSDQGGRQRWOHWLWH[FHHGSVLDERYHILQDOFLUFXODWLQJ
SUHVVXUHLISUHVVXUHPXVWEHKHOGWKLVLVWRHQVXUHWKHVWDJHWRROLVQRWSUHPDWXUHO\RSHQHG
>ĞĂĚ^ůƵƌƌLJ dĂŝů^ůƵƌƌLJ
^LJƐƚĞŵ ĐŽŶŽĞŵ ,ĂůĞŵ
ĞŶƐŝƚLJ ϭϮ͘ϬůďͬŐĂů ϭϱ͘ϴůďͬŐĂů
zŝĞůĚ Ϯ͘ϯϱĨƚϯͬƐŬ ϭ͘ϭϲĨƚϯͬƐŬ
DŝdžtĂƚĞƌ ϭϯ͘ϵϮŐĂůͬƐŬ ϰ͘ϵϴŐĂůͬƐŬ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QFUHDVHSUHVVXUHWRSVLWRRSHQFLUFXODWLQJSRUWVLQVWDJHFROODU6OLJKWO\KLJKHUSUHVVXUH
PD\EHQHFHVVDU\LI72&LVDERYHWKHVWDJHWRRO&%8DQGUHFRUGDQ\VSDFHURUFHPHQWUHWXUQV
WRVXUIDFHDQGYROXPHSXPSHGWRVHHWKHUHWXUQV&LUFXODWHXQWLO<3DJDLQLQSUHSDUDWLRQ
IRUWKHQGVWDJHRIWKHFHPHQWMRE
%HSUHSDUHGIRUFHPHQWUHWXUQVWRVXUIDFH'XPSFHPHQWUHWXUQVLQWKHFHOODURURSHQWKHVKDNHU
E\SDVVOLQHWRWKHFXWWLQJVWDQN+DYHEODFNZDWHUDYDLODEOHDQGYDFWUXFNVUHDG\WRDVVLVW
(QVXUHWRIOXVKRXWDQ\ULJFRPSRQHQWVKDUGOLQHVDQG%23VWDFNWKDWPD\KDYHFRPHLQFRQWDFW
ZLWKWKHFHPHQW
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
6HFRQG6WDJH6XUIDFH&HPHQW-RE
3UHSDUHIRUWKH
QGVWDJHDVQHFHVVDU\&LUFXODWHXQWLOILUVWVWDJHUHDFKHVVXIILFLHQWFRPSUHVVLYH
VWUHQJWK7U\WRPDLQWDLQIORZUDWHWKURXJKVWDJHWRROXQWLOQGVWDJHLVUHDG\+ROGSUHMREVDIHW\
PHHWLQJ
x 3DVWZHOOVKDYHVHHQSUHVVXUHLQFUHDVHZKLOHFLUFXODWLQJWKURXJKVWDJHWRRODIWHUUHGXFHG
UDWH
+(&UHSUHVHQWDWLYHWRZLWQHVVWKHORDGLQJRIWKH(6FHPHQWHUFORVLQJSOXJLQWKHFHPHQWLQJ
KHDG
)LOOVXUIDFHOLQHVZLWKZDWHUDQGSUHVVXUHWHVW
3XPSUHPDLQLQJEEOVSSJWXQHGVSDFHU
0L[DQGSXPSFPWSHUEHORZUHFLSHIRUWKH
QGVWDJH
&HPHQWYROXPHEDVHGRQDQQXODUYROXPHRSHQKROHH[FHVVIRUOHDGDQGIRUWDLO
-REZLOOFRQVLVWRIOHDG WDLO72&EURXJKWWRVXUIDFH&HPHQWZLOOFRQWLQXHWREHSXPSHGXQWLO
FOHDQVSDFHULVREVHUYHGDWVXUIDFH
(VWLPDWHGQG6WDJH7RWDO&HPHQW9ROXPH
&HPHQW6OXUU\'HVLJQQGVWDJHFHPHQWMRE
>ĞĂĚ^ůƵƌƌLJ dĂŝů^ůƵƌƌLJ
^LJƐƚĞŵ ƌĐƚŝĐĞŵ ,ĂůĞŵ
ĞŶƐŝƚLJ ϭϬ͘ϳůďͬŐĂů ϭϱ͘ϴůďͬŐĂů
zŝĞůĚ Ϯ͘ϴϴĨƚϯͬƐŬ ϭ͘ϭϳĨƚϯͬƐŬ
DŝdžĞĚ
tĂƚĞƌ ϮϮ͘ϬϮŐĂůͬƐŬ ϱ͘ϬϴŐĂůͬƐŬ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&RQWLQXHSXPSLQJOHDGXQWLOXQFRQWDPLQDWHGVSDFHULVVHHQDWVXUIDFHWKHQVZLWFKWRWDLO
$IWHUSXPSLQJFHPHQWGURS(6&HPHQWHUFORVLQJSOXJDQGGLVSODFHFHPHQWZLWKVSXGPXGRXW
RIPXGSLWV
'LVSODFHPHQWFDOFXODWLRQ
¶[ESI EEOVPXG
0RQLWRUUHWXUQVFORVHO\ZKLOHGLVSODFLQJFHPHQW$GMXVWSXPSUDWHLIQHFHVVDU\:HOOKHDGVLGH
RXWOHWYDOYHLQFHOODUFDQEHRSHQHGWRWDNHUHWXUQVWRFHOODULIUHTXLUHG%HSUHSDUHGWRSXPSRXW
IOXLGIURPFHOODU+DYHEODFNZDWHUDYDLODEOHWRUHWDUGVHWWLQJRIFHPHQW
'HFLGHDKHDGRIWLPHZKDWZLOOEHGRQHZLWKFHPHQWUHWXUQVRQFHWKH\DUHDWVXUIDFH:HVKRXOG
FLUFXODWHDSSUR[LPDWHO\EEOVRIFHPHQWVOXUU\WRVXUIDFH
/DQGFORVLQJSOXJRQVWDJHFROODUDQGSUHVVXUHXSWR±SVLWRHQVXUHVWDJHWRROFORVHV
)ROORZLQVWUXFWLRQVRI+DOOLEXUWRQSHUVRQQHO%OHHGRIISUHVVXUHDQGFKHFNWRHQVXUHVWDJHWRRO
KDVFORVHG6OLSVZLOOEHVHWDVSHUSODQWRDOORZIXOODQQXOXVIRUUHWXUQVGXULQJVXUIDFHFHPHQW
MRE6HWVOLSV
0DNHLQLWLDOFXWRQ´ILQDOMRLQW/'FXWMRLQW0DNHILQDOFXWRQ´'UHVVRIIVWXPS
,QVWDOO´ZHOOKHDG,IWUDQVLWLRQQLSSOHLVZHOGHGRQDOORZWRFRRODVSHUVFKHGXOH
Ensure to report the following on wellez:
x 3UHIOXVKW\SHYROXPHEEOV ZHLJKWSSJ
x &HPHQWVOXUU\W\SHOHDGRUWDLOYROXPH ZHLJKW
x 3XPSUDWHZKLOHPL[LQJESPQRWHDQ\VKXWGRZQGXULQJPL[LQJRSHUDWLRQVZLWKDGXUDWLRQ
x 3XPSUDWHZKLOHGLVSODFLQJQRWHZKHWKHUGLVSODFHPHQWE\SXPSWUXFNRUPXGSXPSVZHLJKW W\SH
RIGLVSODFLQJIOXLG
x 1RWHLIFDVLQJLVUHFLSURFDWHGRUURWDWHGGXULQJWKHMRE
x &DOFXODWHGYROXPHRIGLVSODFHPHQWDFWXDOGLVSODFHPHQWYROXPHZKHWKHUSOXJEXPSHG EXPS
SUHVVXUHGRIORDWVKROG
x 3HUFHQWPXGUHWXUQVGXULQJMRELILQWHUPLWWHQWQRWHWLPLQJGXULQJSXPSLQJRIMRE)LQDOFLUFXODWLQJ
SUHVVXUH
x 1RWHLISUHIOXVKRUFHPHQWUHWXUQVDWVXUIDFH YROXPH
x 1RWHWLPHFHPHQWLQSODFH
x 1RWHFDOFXODWHGWRSRIFHPHQW
x $GGDQ\FRPPHQWVZKLFKZRXOGGHVFULEHWKHVXFFHVVRUSUREOHPVGXULQJWKHFHPHQWMRE
Send final “As-Run” casing tally & casing and cement report to jengel@hilcorp.com and
joseph.lastufka@hilcorp.com This will be included with the EOW documentation that goes to the
AOGCC.
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
1''LYHUWHU18%23( 7HVW
*LYH$2*&&KUQRWLFHRI%23(WHVWIRUWHVWZLWQHVV
1'WKHGLYHUWHU7NQLIHJDWHGLYHUWHUOLQH 18´[´0FDVLQJVSRRO
18´[0%23DVIROORZV
x %23FRQILJXUDWLRQIURPWRSGRZQ´[0DQQXODU´[0GRXEOHJDWH
´[0PXGFURVV´[0VLQJOHJDWH
x 'RXEOHJDWHUDPVKRXOGEHGUHVVHGZLWK ´[´9%5V LQWRSFDYLW\EOLQGUDPLQ
ERWWRPFDYLW\
x 6LQJOHUDPFDQEHGUHVVHGZLWK ´[´9%5VRU´VROLGERG\UDPV
x 18EHOOQLSSOHLQVWDOOIORZOLQH
x ,QVWDOOPDQXDOYDOYH +&5YDOYHRQNLOOVLGHRIPXGFURVV0DQXDOYDOYHFORVHVWWR
PXGFURVV
x ,QVWDOOPDQXDOYDOYHRQFKRNHVLGHRIPXGFURVV,QVWDOODQ+5&RXWVLGHRIWKHPDQXDO
YDOYH
5803'5&'DQGUHODWHGHTXLSPHQW
5XQ´%23WHVWSOXJ
7HVW%23WRSVLIRUPLQ7HVWDQQXODUWRSVLIRUPLQ
x 7HVWZLWK´WHVWMRLQWDQGWHVW9%5¶VZLWK´DQG´WHVWMRLQWV
x &RQILUPWHVWSUHVVXUHVZLWK37'
x (QVXUHWRPRQLWRUVLGHRXWOHWYDOYHVDQGDQQXOXVYDOYHSUHVVXUHJDXJHVWRHQVXUHQRSUHVVXUH
LVWUDSSHGXQGHUQHDWKWHVWSOXJ
x 2QFH%23(WHVWLVFRPSOHWHVHQGDFRS\RIWKHWHVWUHSRUWWRWRZQHQJLQHHUDQGGULOOLQJWHFK
5'%23WHVWHTXLSPHQW
'XPSDQGFOHDQPXGSLWVVHQGVSXGPXGWR* ,SDGIRULQMHFWLRQ
0L[SSJ%DUDGULOO1IOXLGIRUSURGXFWLRQKROH
6HWZHDUEXVKLQJLQZHOOKHDG
,IQHHGHGUDFNEDFNDVPXFK´'3LQGHUULFNDVSRVVLEOHWREHXVHGZKLOHGULOOLQJWKHKROH
VHFWLRQ
(QVXUH´OLQHUVLQPXGSXPSV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
'ULOO´+ROH6HFWLRQ
08´&OHDQRXW%+$0LOOWRRWK%LW 3'0
7,+Z´FOHDQRXW%+$WRVWDJHWRRO1RWHGHSWK72&WDJJHGRQ$0UHSRUW'ULOORXW
VWDJHWRRO
7,+WR72&DERYHWKHEDIIOHDGDSWHU1RWHGHSWK72&WDJJHGRQPRUQLQJUHSRUW
58DQGWHVWFDVLQJWRSVLPLQ(QVXUHWRUHFRUGYROXPHSUHVVXUHHYHU\óEEODQG
SORWRQ),7JUDSK$2*&&UHJLVRIEXUVW aSVLEXWPD[WHVWSUHVVXUH
RQWKHZHOOLVSVLDVSHU$2*&&'RFXPHQWLQFUHPHQWDOYROXPHSXPSHGDQGVXEVHTXHQW
SUHVVXUHDQGYROXPHUHWXUQHG(QVXUHUDPVDUHXVHGWRWHVWFDVLQJDVSHU$2*&&,QGXVWU\
*XLGDQFH%XOOHWLQ
'ULOORXWVKRHWUDFNDQG¶RIQHZIRUPDWLRQ
&%8DQGFRQGLWLRQPXGIRU),7
&RQGXFW),7WRSSJ(0:&KDUW7HVW(QVXUHWHVWLVUHFRUGHGRQVDPHFKDUWDVFDVLQJWHVW
'RFXPHQWLQFUHPHQWDOYROXPHSXPSHGDQGVXEVHTXHQWSUHVVXUHDQGYROXPHUHWXUQHG
x SSJGHVLUHGWRFRYHUVKRHVWUHQJWKIRUH[SHFWHG(&'¶V$SSJ),7LVWKHPLQLPXP
UHTXLUHGWRGULOODKHDG
x SSJSURYLGHV!EEOVEDVHGRQSSJ0:SSJ33VZDEEHGNLFNDWSSJ%+3
322+DQG/'FOHDQRXW%+$
38´GLUHFWLRQDO%+$
x (QVXUH%+$FRPSRQHQWVKDYHEHHQLQVSHFWHGSUHYLRXVO\
x 'ULIWDQGFDOLSHUDOOFRPSRQHQWVEHIRUH089LVXDOO\YHULI\QRGHEULVLQVLGHFRPSRQHQWVWKDW
FDQQRWEHGULIWHG
x (QVXUH7)RIIVHWLVPHDVXUHGDFFXUDWHO\DQGHQWHUHGFRUUHFWO\LQWRWKH0:'VRIWZDUH
x (QVXUH0:'LV58DQGRSHUDWLRQDO
x +DYH''UXQK\GUDXOLFVFDOFXODWLRQVRQVLWHWRHQVXUHRSWLPXPQR]]OHVL]LQJ+\GUDXOLFV
FDOFXODWLRQVDQGUHFRPPHQGHG7)$LVDWWDFKHGEHORZ
x 'ULOOVWULQJZLOOEH´61&
x 5XQDSRUWHGIORDWLQWKHSURGXFWLRQKROHVHFWLRQ
6FKUDGHU%OXII%LW-HWWLQJ*XLGHOLQHV
)RUPDWLRQ -HWWLQJ 7)$
1% [
2$ [
2%[
(PDLOFDVLQJWHVWDQG),7GLJLWDOGDWDWR$2*&&SURPSWO\XSRQFRPSOHWLRQ(PDLO0HOYLQ5L[VH#DODVNDJRY
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
´KROHVHFWLRQPXGSURJUDPVXPPDU\
x 'HQVLW\:HLJKWLQJPDWHULDOWREHXVHGIRUWKHKROHVHFWLRQZLOOEHFDOFLXPFDUERQDWH
$GGLWLRQDOFDOFLXPFDUERQDWHZLOOEHRQORFDWLRQWRZHLJKWXSWKHDFWLYHV\VWHPSSJ
DERYHKLJKHVWDQWLFLSDWHG0:
x 6ROLGV&RQFHQWUDWLRQ,WLVLPSHUDWLYHWKDWWKHVROLGVFRQFHQWUDWLRQEHNHSWORZZKLOH
GULOOLQJWKHSURGXFWLRQKROHVHFWLRQ.HHSWKHVKDNHUVFUHHQVL]HRSWLPL]HGDQGIOXLG
UXQQLQJWRQHDUWKHHQGRIWKHVKDNHUV,WLVRND\LIWKHVKDNHUVUXQVOLJKWO\ZHWWRHQVXUH
ZHDUHUXQQLQJWKHILQHVWVFUHHQVSRVVLEOH
x 5KHRORJ\.HHSYLVFRVLILHUDGGLWLRQVWRDQDEVROXWHPLQLPXP19,6'DWDVXJJHVWV
H[FHVVLYHYLVFRVLILHUFRQFHQWUDWLRQVFDQGHFUHDVHUHWXUQSHUPHDELOLW\'RQRWSXPSKLJK
YLVVZHHSVLQVWHDGXVHWDQGHPVZHHSV(QVXUHUSPLV!KROHGLDPHWHUIRU
VXIILFLHQWKROHFOHDQLQJ
x 5XQWKHFHQWULIXJHFRQWLQXRXVO\ZKLOHGULOOLQJWKHSURGXFWLRQKROHWKLVZLOOKHOSZLWK
VROLGVUHPRYDO
x 'XPSDQGGLOXWHDVQHFHVVDU\WRNHHSGULOOHGVROLGVWRDQDEVROXWHPLQLPXP
x 0'7RWFR397ZLOOEHXVHGWKURXJKRXWWKHGULOOLQJDQGFRPSOHWLRQSKDVH5HPRWH
PRQLWRULQJVWDWLRQVZLOOEHDYDLODEOHDWWKHGULOOHU¶VFRQVROH&R0DQRIILFH
7RROSXVKHURIILFH
6\VWHP7\SH±SSJ%DUDGULOO1GULOOLQJIOXLG
3URSHUWLHV
,QWHUYDO 'HQVLW\ 39 <3
/6<3 7RWDO
6ROLGV
0%7 +3+7 +DUGQHVV
3URGXFWLRQ
$/$3
6\VWHP)RUPXODWLRQ
3URGXFW &RQFHQWUDWLRQ
:DWHU
.&/
.2+
19,6
'(;75,'/7
%$5$&$5%
%$5$&$5%
%$5$&$5%
%$5$&25
%$5$6&$9'
;&,'(
EEO
SSE
SSE
±SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
7,+ZLWK´GLUHFWLRQDODVVHPEO\WRERWWRP
,QVWDOO03'5&'
'LVSODFHZHOOERUHWRSSJ%DUDGULOO1GULOOLQJIOXLG
x 'HQVLW\PD\FKDQJHEDVHGXSRQ7'RIVXUIDFHKROHVHFWLRQ
%HJLQGULOOLQJ´KROHVHFWLRQRQERWWRPVWDJLQJWHFKQLTXH
x 7DJERWWRPDQGEHJLQGULOOLQJZLWKUSPVDWELW$OORZ:2%WRVWDELOL]HDW.
x 6ORZO\EHJLQEULQJLQJXSUSPVPRQLWRULQJVWLFNVOLSDQG%+$YLEUDWLRQV
x ,I%+$EHJLQVWRVKRZH[FHVVLYHYLEUDWLRQVZKLUOVWLFNVOLSLWPD\EHQHFHVVDU\WR38
RIIERWWRPDQGUHVWDUWRQERWWRPVWDJLQJWHFKQLTXH,IVWLFNVOLSFRQWLQXHVFRQVLGHUDGGLQJ
OXEHV
'ULOO´KROHVHFWLRQWRVHFWLRQ7'SHU*HRORJLVWDQG'ULOOLQJ(QJLQHHU
x )ORZ5DWH*30WDUJHWPLQ$9¶VIWPLQ*30
x 530
x (QVXUHVKDNHUVFUHHQVDUHVHWXSWRKDQGOHWKLVIORZUDWH(QVXUHVKDNHUVDUHUXQQLQJVOLJKWO\
ZHWWRPD[LPL]HVROLGVUHPRYDOHIILFLHQF\&KHFNIRUKROHVLQVFUHHQVRQHYHU\FRQQHFWLRQ
x .HHSSLSHPRYHPHQWZLWKSXPSVRIIWRVORZVSHHGVWRNHHSVXUJHDQGVZDESUHVVXUHVORZ
x 7DNH0:'VXUYH\VHYHU\VWDQGFDQEHWDNHQPRUHIUHTXHQWO\LIGHHPHGQHFHVVDU\H[
FRQFUHWLRQGHIOHFWLRQ
x 0RQLWRU7RUTXHDQG'UDJZLWKSXPSVRQHYHU\VWDQGV
x 0RQLWRU(&'SXPSSUHVVXUH KRRNORDGWUHQGVIRUKROHFOHDQLQJLQGLFDWLRQ
x *RRGGULOOLQJDQGWULSSLQJSUDFWLFHVDUHYLWDOIRUDYRLGDQFHRIGLIIHUHQWLDOVWLFNLQJ0DNH
HYHU\HIIRUWWRNHHSWKHGULOOVWULQJPRYLQJZKHQHYHUSRVVLEOHDQGDYRLGVWRSSLQJZLWKWKH
%+$DFURVVWKHVDQGIRUDQ\H[WHQGHGSHULRGRIWLPH
x 8VH$'5WRVWD\LQVHFWLRQ5HVHUYRLUSODQLVWRVWD\LQ2%DVDQG
x /LPLWPD[LPXPLQVWDQWDQHRXV523WR)3+7KHVDQGVZLOOGULOOIDVWHUWKDQWKLVEXW
ZKHQFRQFUHWLRQVDUHKLWZKHQGULOOLQJWKLVIDVWFXWWHUGDPDJHFDQRFFXU
x 7DUJHW523LVDVIDVWDVZHFDQFOHDQWKHKROHZLWKRXWKDYLQJWREDFNUHDPFRQQHFWLRQV
x 6FKUDGHU%OXII2%D&RQFUHWLRQV+LVWRULFDOO\
x 03'ZLOOEHXWLOL]HGWRPRQLWRUSUHVVXUHEXLOGXSRQFRQQHFWLRQV
x ´/DWHUDO$&
x 6$$//DQG3%IDLO$&ZLWKDFOHDUDQFHIDFWRU6DQGSDUHQW
OHJVZLOOEHVKXWLQDQGLVRODWHGZLWKDWXELQJWDLOSOXJWRPLWLJDWH+6(ULVN
5HIHUHQFH+DOOLEXUWRQKDVDSURFHGXUHIRU6FKUDGHU2+VLGHWUDFNVEDVHGRQOHVVRQV
OHDUQHGDQGEHVWSUDFWLFHV(QVXUHWKH''LVUHIHUHQFLQJWKHLUSURFHGXUH
x 3DWLHQFHLVNH\*HWWLQJNLFNHGRIIWRRTXLFNO\PLJKWKDYHEHHQWKHFDXVHRIIDLOHGOLQHU
UXQVRQSDVWZHOOV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
x ,IDNQRZQIDXOWLVFRPLQJXSSXWDVOLJKW³NLFNRIIUDPS´LQZHOOERUHDKHDGRIWKHIDXOWVR
ZHKDYHDQLFHSODFHWRORZVLGH
x $WWHPSWWRORZVLGHLQDIDVWGULOOLQJLQWHUYDOZKHUHWKHZHOOERUHLVKHDGHGXS
x 2ULHQW7)WRORZVLGHDQGGLJDWURXJKZLWKKLJKIORZUDWHVIRUWKHILUVWIHHWZRUNLQJ
VWULQJEDFNDQGIRUWK7URXJKIRUDSSUR[LPDWHO\PLQXWHV
x 7LPHGULOODWWRIHHWSHUKRXUZLWKKLJKIORZUDWHV*UDGXDOO\LQFUHDVH523DVWKH
RSHQKROHVLGHWUDFNLVDFKLHYHG
$W7'&%8DWOHDVWWLPHVDWIWPLQ$9*30DQGURWDWLRQ5303XPS
WDQGHPVZHHSVLIQHHGHG
x 0RQLWRU%8IRULQFUHDVHLQFXWWLQJVFXWWLQJVLQODWHUDOVFRPHEDFNLQZDYHVDQGQRWDFRQVLVWHQW
VWUHDPFLUFXODWHPRUHLIQHFHVVDU\
x ,IVHHSDJHORVVHVDUHVHHQZKLOHGULOOLQJFRQVLGHUUHGXFLQJ0:DW7'WRSSJPLQLPXP
0L[DQGSXPSEEOSSE6$33SLOO/LQHXSWRDFORVHGORRSV\VWHPDQGFLUFXODWHWKUHH6$3
SLOOVZLWKEEOLQEHWZHHQ'LVSODFHRXW6$3SLOOV0RQLWRUVKDNHUVIRUUHWXUQVRIPXGILOWHU
FDNHDQGFDOFLXPFDUERQDWH&LUFXODWHWKHZHOOFOHDQ
/RVVHVGXULQJWKHFOHDQXSRIWKHZHOOERUHDUHDJRRGLQGLFDWLRQWKDWWKHPXGILOWHUFDNHLVEHLQJ
UHPRYHGLQFOXGLQJDQLQFUHDVHLQWKHORVVUDWH
'LVSODFH2+OLQHUYROXPHZLWKYLVFRVLILHGEULQH
x 3URSRVHGEULQHEOHQGVDPHDVXVHGRQ0DLPLQJIRUDQRQWKH530UHDGLQJ
.&O SSEIRU
1D&O SSJIRUSSJ
/RWRUT
/XEH
6RGD$VK DVQHHGHGIRUS+
%XVDQ SSE
)OR9LV3OXV SSE
x 0RQLWRUZHOOIRUORVVUDWHDQGFRQWDFW'ULOOLQJ(QJLQHHUDQGRU2SV(QJLQHHULIIXUWKHU
GLVFXVVLRQQHHGHGSULRUWR%522+
0RQLWRUWKHUHWXUQHGIOXLGVFDUHIXOO\ZKLOHGLVSODFLQJWREULQH
%522+ZLWKWKHGULOOLQJDVVHPEO\WRWKH´FDVLQJVKRH
x &LUFXODWHDWIXOOGULOOUDWHOHVVLIORVVHVDUHVHHQ*30PLQLPXP
x 5RWDWHDWPD[LPXP530WKDWFDQEHVXVWDLQHG
x 3XOOLQJVSHHG±PLQVWDQGVOLSWRVOLSWLPHQRWLQFOXGLQJFRQQHFWLRQVDGMXVWDV
GLFWDWHGE\KROHFRQGLWLRQV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
x ,IEDFNUHDPLQJRSHUDWLRQVDUHFRPPHQFHGFRQWLQXHEDFNUHDPLQJWRWKHVKRH
,IDEQRUPDOSUHVVXUHKDVEHHQREVHUYHGLQWKHODWHUDOXWLOL]H03'WRFORVHRQFRQQHFWLRQVZKLOH
%522+
&%8PLQLPXPWZRWLPHVDW´VKRHDQGFOHDQFDVLQJZLWKKLJKYLVVZHHSV
0RQLWRUZHOOIRUIORZSUHVVXUHEXLOGXSZLWK03',QFUHDVHIOXLGZHLJKWLIQHFHVVDU\
x :HOOERUHEUHDWKLQJKDVEHHQVHHQRQSDVW0386%ZHOOV3HUIRUPH[WHQGHGIORZFKHFNVWR
GHWHUPLQHLIZHOOLVEUHDWKLQJWUHDWDOOIORZDVDQLQIOX[XQWLOSURYHQRWKHUZLVH
x ,IQHFHVVDU\LQFUHDVH0:DWVKRHIRUDQ\KLJKHUWKDQH[SHFWHGSUHVVXUHVHHQ
x (QVXUHIOXLGFRPLQJRXWRIKROHKDVSDVVHGD367DWWKHSRVVXPEHOO\
322+DQG/'%+$
&RQWLQXHWR322+DQGVWDQGEDFN%+$LISRVVLEOH5DEELW'3RQ722+HQVXUHUDEELW
GLDPHWHULVVXIILFLHQWIRUIXWXUHEDOOGURSV
x 2QO\/:'RSHQKROHORJVDUHSODQQHGIRUWKHKROHVHFWLRQ*55HV7KHUHZLOOQRWEHDQ\
DGGLWLRQDOORJJLQJUXQVFRQGXFWHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
5XQ´,QMHFWLRQ/LQHU
:HOOFRQWUROSUHSDUHGQHVV,QWKHHYHQWRIDQLQIOX[RIIRUPDWLRQIOXLGVZKLOHUXQQLQJWKH
LQMHFWLRQOLQHUWKHIROORZLQJZHOOFRQWUROUHVSRQVHSURFHGXUHZLOOEHIROORZHG
x 38 08WKH´VDIHW\MRLQWZLWK´FURVVRYHULQVWDOOHGRQERWWRP7,:YDOYHLQRSHQ
SRVLWLRQRQWRS´KDQGOLQJMRLQWDERYH7,:7KLVMRLQWVKDOOEHIXOO\08DQG
DYDLODEOHSULRUWRUXQQLQJWKHILUVWMRLQWRI´OLQHU
x 6ODFNRIIDQGZLWK´'3DFURVVWKH%23VKXWLQUDPRUDQQXODURQ´'3&ORVH7,:
x 3URFHHGZLWKZHOONLOORSHUDWLRQV
x 1RWHLI$LUORFNEXR\DQF\V\VWHPKDVEHHQLQVWDOOHGLQOLQHUVXEZLOOQHHGWREHSUHVVXUHGXS
WRaSVLDVVXPLQJQRK\GURVWDWLFRYHUEDODQFHWRVKHDURXWDQGLQMHFWWKURXJKOLQHUDQG
IORDWV
58´OLQHUUXQQLQJHTXLSPHQW
x (QVXUH´-)(%HDU[1&FURVVRYHULVRQULJIORRUDQG08WR)269
x (QVXUHDOOFDVLQJKDVEHHQGULIWHGRQWKHGHFNSULRUWRUXQQLQJ
x %HVXUHWRFRXQWWKHWRWDORIMRLQWVRQWKHGHFNEHIRUHUXQQLQJ
x .HHSKROHFRYHUHGZKLOH58FDVLQJWRROV
x 5HFRUG2'¶V,'¶VOHQJWKV61¶VRIDOOFRPSRQHQWVZYHQGRU PRGHOLQIR
5XQ´LQMHFWLRQOLQHU
x ´OLQHUZLOOEHIORDWHGWRERWWRPIRULPSURYHG7 '/LQHUZLOOEHLVRODWHGE\IORDWVKRH
DQGIORDWFROODUDWWKHWRHFORVHG1&6VOHHYHVDORQJOLQHUOHQJWKDQGWKH$LUORFNEXR\DQF\
V\VWHPDWWRSRIOLQHU
x 8VH³+XQWLQJ&OHDU5XQ´RU ³%HVW2/LIH1´WKUHDGFRPSRXQG'RSHSLQHQGRQO\
ZSDLQWEUXVK:LSHRIIH[FHVV
x 8WLOL]HDFROODUFODPSXQWLOZHLJKWLVVXIILFLHQWWRNHHSVOLSVVHWSURSHUO\
x 8VHOLIWQXEELQVDQGVWDEELQJJXLGHVIRUWKHOLQHUUXQ
x ,QVWDOOMRLQWVDVSHUWKH5XQQLQJ2UGHU)URP&RPSOHWLRQ(QJLQHHUSRVW7'
o 'RQRWSODFHWRQJVRUVOLSVRQVOHHYHMRLQWV
o 1&6VOHHYHVZLOOEHVSDFHGa¶0'DSDUW
o :HOOWHFH[SDQGDEOHPHWDOSDFNHUVZLOOEHVSDFHGa¶0'DSDUW
x ,IOLQHUOHQJWKH[FHHGVVXUIDFHFDVLQJOHQJWKHQVXUHFHQWUDOL]HUVDUHSODFHGMWIRUHDFKMRLQW
RXWVLGHRIWKHVXUIDFHVKRH
x 2EWDLQXSDQGGRZQZHLJKWVRIWKHOLQHUEHIRUHHQWHULQJRSHQKROH5HFRUGURWDWLQJWRUTXHDW
DQGUSP
x 6HHGDWDVKHHWVRQWKHQH[WSDJHIRU08WRUTXHIRUWKH´OLQHUFRQQHFWLRQV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
(QVXUHWRUXQHQRXJKOLQHUWRSURYLGHIRUVHWWLQJWKHOLQHUKDQJHUDWa¶0'
x &RQILUPVHWGHSWKZLWKFRPSOHWLRQHQJLQHHU
x MRLQWVRI´ZLOOEHUDQXQGHUWKHOLQHUKDQJHUIRUWKHSURGXFWLRQSDFNHU&RQILUPZLWK
FRPSOHWLRQHQJLQHHU
(QVXUHKDQJHUSNUZLOOQRWEHVHWLQD´FRQQHFWLRQ
x $2*&&UHJXODWLRQVUHTXLUHDPLQLPXP¶RYHUODSEHWZHHQWKHLQQHUDQGRXWHUVWULQJVDV
SHU$$&G'RQRWSODFHOLQHUKDQJHUSDFNHUDFURVV´FRQQHFWLRQ
%HIRUHSLFNLQJXS%DNHU6/=;3OLQHUKDQJHUSDFNHUDVV\FRXQWWKHRIMRLQWVRQWKHSLSHGHFN
WRPDNHVXUHLWFRLQFLGHVZLWKWKHSLSHWDOO\
08%DNHU6/=;3OLQHUWRSSDFNHUWR´OLQHU
1RWH3862527DQGWRUTXHRIOLQHU5XQOLQHULQWKHKROHRQHVWDQGDQGSXPSWKURXJKOLQHU
KDQJHUWRHQVXUHDFOHDUIORZSDWKH[LVWV
5,+ZLWKOLQHUQRIDVWHUWKDQIWPLQ±WKLVLVWRSUHYHQWEXFNOLQJWKHOLQHUDQGGULOOVWULQJDQG
ZHLJKWWUDQVIHUWRJHWOLQHUWRERWWRPZLWKPLQLPDOURWDWLRQ:DWFKGLVSODFHPHQWFDUHIXOO\DQG
DYRLGVXUJLQJWKHKROHRUEXFNOLQJWKHOLQHU6ORZGRZQUXQQLQJVSHHGLIQHFHVVDU\
x (QVXUH´'3+:'3KDVEHHQGULIWHG
x )LOOGULOOSLSHRQWKHIO\DERYHWKH$LUORFN%RX\DQF\V\VWHP0RQLWRU)/DQGLIILOOLQJLV
UHTXLUHGGXHWRORVVHVVXUJLQJ
6ORZLQDQGRXWRIVOLSV(QVXUHDFFXUDWHVODFNRIIGDWDLVJDWKHUHGGXULQJ5,+5HFRUGVKRH
GHSWK62GHSWKHYHU\VWDQG5HFRUGWRUTXHYDOXHLILWEHFRPHVQHFHVVDU\WRURWDWHWKHVWULQJWR
ERWWRP
2EWDLQXSDQGGRZQZHLJKWVRIWKHOLQHUEHIRUHHQWHULQJRSHQKROH5HFRUGURWDWLQJWRUTXHDW
530
,IDQ\RSHQKROHVLGHWUDFNVKDYHEHHQGULOOHGPRQLWRUVLGHWUDFNGHSWKVGXULQJUXQLQDQGHQVXUH
VKRHHQWHUVFRUUHFWKROH
7,+GHHSHUWKDQSODQQHGVHWWLQJGHSWK/DVWPRWLRQRIWKHOLQHUVKRXOGEHXSWRHQVXUHLWLVVHWLQ
WHQVLRQ
5LJXSWRSXPSGRZQWKHZRUNVWULQJZLWKWKHULJSXPSV3UHVVXUHXSWREXUVW$LUORFNGLVNSHU
1&6SURFHGXUH
x 'LVNUDWHGDWSVL7KHH[SHFWHGSXPSSUHVVXUHVKRXOGEHFORVHUWRSVLZLWK
K\GURVWDWLFRYHUEDODQFH
/LQHXSIRUFRQWLQXRXVKROHILOOPRQLWRULQJ3URFHHGWRDOWHUQDWHO\ILOODQGYHQWOLQHUXQWLOOLQHU
YROXPHEHORZ$LUORFNLVILOOHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
%UHDNFLUFXODWLRQ%HJLQFLUFXODWLQJDWa%30DQGPRQLWRUSXPSSUHVVXUHV'RQRWH[FHHG
SVLZKLOHFLUFXODWLQJ3XVKHUWRROLVVHWDWSVLZLWKVKHDUVFUHZVEXWLWVKRXOGEH
GLVFXVVHGEHIRUHH[FHHGLQJSVL1RWHDOOORVVHV&RQILUPDOOSUHVVXUHVZLWK%DNHU
3ULRUWRVHWWLQJWKHKDQJHUDQGSDFNHUGRXEOHFKHFNDOOSLSHWDOOLHVDQGUHFRUGDPRXQWRIGULOO
SLSHOHIWRQORFDWLRQ(QVXUHDOOQXPEHUVFRLQFLGHZLWKSURSHUVHWWLQJGHSWKRIOLQHUKDQJHU
6KXWGRZQSXPSV'URSVHWWLQJEDOOGRZQWKHZRUNVWULQJDQGSXPSVORZO\%306ORZ
SXPSEHIRUHWKHEDOOVHDWV'RQRWDOORZEDOOWRVODPLQWREDOOVHDW
&RQWLQXHSUHVVXULQJXSWRSVLWRVHWWKH6/=;3OLQHUKDQJHUSDFNHU+ROGIRUPLQXWHV
6ODFNRII.OEVRQWKH6/=;3OLQHUKDQJHUSDFNHUWRHQVXUHWKH+5'(VHWWLQJWRROLVLQ
FRPSUHVVLRQIRUUHOHDVHIURPWKH6/=;3OLQHUKDQJHUSDFNHU&RQWLQXHSUHVVXULQJXSSVL
WRUHOHDVHWKH+5'(UXQQLQJWRRO
%OHHG'3SUHVVXUHWRSVL3LFNXSWRH[SRVHURWDWLQJGRJVXEDQGVHWGRZQ.ZLWKRXW
SXOOLQJVOHHYHSDFNRII3LFNEDFNXSZLWKRXWSXOOLQJVOHHYHSDFNRIIEHJLQURWDWLQJDW
530DQGVHWGRZQ.DJDLQ
38WRQHXWUDOZHLJKWFORVH%23DQGWHVWDQQXOXVWRSVLIRUPLQXWHVFKDUWHG
%OHHGRIISUHVVXUHDQGRSHQ%23(3LFNXSWRYHULI\WKDWWKH+5'VHWWLQJWRROKDVUHOHDVHG,I
SDFNHUGLGQRWWHVWURWDWLQJGRJVXEFDQEHXVHGWRVHWSDFNHU,IUXQQLQJWRROFDQQRWEH
K\GUDXOLFDOO\UHOHDVHGDSSO\/+WRUTXHWRPHFKDQLFDOO\UHOHDVHWKHVHWWLQJWRRO
38SXOOLQJUXQQLQJWRROIUHHRIWKHSDFNHUDQGGLVSODFHZLWKDWPD[UDWHWRZDVKWKHOLQHUWRS
3XPSVZHHSVDVQHHGHG
322+/'DQGLQVSHFWUXQQLQJWRROV,IVHWWLQJRIOLQHUKDQJHUSDFNHUSURFHHGHGDVSODQQHG
/''3RQWKH722+
1RWH2QFHUXQQLQJWRROLV/'VZDSWRWKHFRPSOHWLRQ$)(
GWHVWDQQXOXVWRSVLIRUPLQXWHVFKDUWHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
5XQ´7LHEDFN
58DQGSXOOZHDUEXVKLQJ*HWDQDFFXUDWHPHDVXUHPHQWRI5.%WRWXELQJKDQJHUORDGVKRXOGHU
WREHXVHGIRUWLHEDFNVSDFHRXWFDOFXODWLRQ,QVWDOO´VROLGERG\FDVLQJUDPVLQWKHXSSHUUDP
FDYLW\58WHVWLQJHTXLSPHQW37WRSVLZLWK´WHVWMRLQW5'WHVWLQJHTXLSPHQW
58´FDVLQJKDQGOLQJHTXLSPHQW
x (QVXUH;2WR'3PDGHXSWR)269DQGUHDG\RQULJIORRU
x 5LJXSFRPSXWHUWRUTXHPRQLWRULQJVHUYLFH
x 6WULQJVKRXOGVWD\IXOOZKLOHUXQQLQJ58ILOOXSOLQHDQGFKHFNDVDSSURSULDWH
38´WLHEDFNVHDODVVHPEO\DQGVHWLQURWDU\WDEOH(QVXUH´VHDODVVHPEO\KDV´KROHV
DERYHWKHILUVWVHDO7KHVHKROHVZLOOEHXVHGWRVSRWGLHVHOIUHH]HSURWHFWLQWKH´[´
DQQXOXV
08ILUVWMRLQWRI´WRVHDODVV\
5XQ´/%7&WLHEDFNWRSRVLWLRQVHDODVVHPEO\WZRMRLQWVDERYHWLHEDFNVOHHYH
5HFRUG38DQG62ZHLJKWV
´/%7&
08´WR'3FURVVRYHU
08VWDQGRI'3WRVWULQJDQG08WRSGULYH
%UHDNFLUFXODWLRQDW%30DQGEHJLQORZHULQJVWULQJ
1RWHVHDODVVHPEO\HQWHULQJWLHEDFNVOHHYHZLWKDSUHVVXUHLQFUHDVHVWRSSXPSLQJDQGEOHHGRII
SUHVVXUH/HDYHVWDQGSLSHEOHHGRIIYDOYHRSHQ
&RQWLQXHORZHULQJVWULQJDQGODQGRXWRQQRJR6HWGRZQ±.DQGPDUNWKHSLSHDV³12
*2'(37+´
38VWULQJ UHPRYHXQQHFHVVDU\´MRLQWV
6SDFHRXWZLWKSXSVDVQHHGHGWROHDYHWKHQRJRIWDERYHIXOO\QRJRSRVLWLRQZKHQWKHFDVLQJ
KDQJHULVODQGHG(QVXUHRQHIXOOMRLQWLVEHORZWKHFDVLQJKDQJHU
38DQG08WKH´FDVLQJKDQJHU
&DVLQJ2' 7RUTXH
´7RPDUN
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
(QVXUHFLUFXODWLRQLVSRVVLEOHWKURXJK´VWULQJ
58DQGFLUFXODWLRQFRUURVLRQLQKLELWHGEULQHLQWKH´[´DQQXOXV
:LWKVHDOVVWDEEHGLQWRWLHEDFNVOHHYHVSRWGLHVHOIUHH]HSURWHFWLRQIURP¶79'WRVXUIDFH
LQ´[´DQQXOXVE\UHYHUVHFLUFXODWLQJWKURXJKWKHKROHVLQWKHVHDODVVHPEO\(QVXUH
DQQXODUSUHVVXUHDUHOLPLWHGWRSUHYHQWFROODSVHRIWKH´FDVLQJYHULI\FROODSVHSUHVVXUHRI´
WLHEDFNVHDODVVHPEO\
62DQGODQGKDQJHU&RQILUPKDQJHUKDVVHDWHGSURSHUO\LQZHOOKHDG0DNHQRWHRIDFWXDO
ZHLJKWRQKDQJHURQPRUQLQJUHSRUW
%DFNRXWWKHODQGLQJMRLQW08SDFNRIIUXQQLQJWRRODQGLQVWDOOSDFNRIIRQERWWRPRIODQGLQJ
MRLQW6HWFDVLQJKDQJHUSDFNRIIDQG5,/'637YRLGWRSVLIRUPLQXWHV
5'FDVLQJUXQQLQJWRROV
37´[´DQQXOXVWRSVLIRUPLQXWHVFKDUWHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
5XQ8SSHU&RPSOHWLRQ3RVW5LJ:RUN
58WRUXQ´/9$0723WXELQJ
x (QVXUHZHDUEXVKLQJLVSXOOHG
x (QVXUH´/9$0723[1&FURVVRYHULVRQULJIORRUDQG08WR)269
x (QVXUHDOOWXELQJKDVEHHQGULIWHGLQWKHSLSHVKHGSULRUWRUXQQLQJ
x %HVXUHWRFRXQWWKHWRWDORIMRLQWVLQWKHSLSHVKHGEHIRUHUXQQLQJ
x .HHSKROHFRYHUHGZKLOH58FDVLQJWRROV
x 5HFRUG2'¶V,'¶VOHQJWKV61¶VRIDOOFRPSRQHQWVZLWKYHQGRU PRGHOLQIR
x 0RQLWRUGLVSODFHPHQWIURPZHOOERUHZKLOH5,+
3808DQG5+ZLWKWKHIROORZLQJ´LQMHFWLRQFRPSOHWLRQMHZHOU\WDOO\WREHSURYLGHGE\
2SHUDWLRQV(QJLQHHU
x 7XELQJ-HZHOU\WRLQFOXGH
x [;11LSSOH
x [*/0
x [;1LSSOH
x [3URGXFWLRQ3DFNHU
x ;;;MRLQWV´/9$0723
x ;:/(*VHWDVFORVHWR´[´OLQHU[RDVSRVVLEOH
38DQG08WKH´WXELQJKDQJHU
5HFRUG38DQG62ZHLJKWVEHIRUHODQGLQJKDQJHU1RWH38DQG62ZHLJKWVRQWDOO\DORQJZLWK
EDQGFODPSVXPPDU\
/DQGWKHWXELQJKDQJHUDQG5,/'6/D\GRZQWKHODQGLQJMRLQW
,QVWDOO´+3%391'%23,QVWDOOWKHSOXJRIIWRRO
18WKHWXELQJKHDGDGDSWHUDQG18WKHWUHH
37WKHWXELQJKDQJHUYRLGWRSVL37WKHWUHHWRSVL
3XOOWKHSOXJRIIWRRODQG%39
5HYHUVHFLUFXODWHWKHZHOORYHUWRFRUURVLRQLQKLELWHGVRXUFHZDWHUIROORZE\EEOVRIGLHVHO
IUHH]HSURWHFWIRUERWKWXELQJDQG,$WR¶0'
'URSWKHEDOO URGDQGFRPSOHWHORDGLQJWXELQJDQGK\GUDXOLFDOO\VHWWKHSDFNHUDVSHU
+DOOLEXUWRQ¶VVHWWLQJSURFHGXUH
3UHVVXUHXSDQGWHVWWKHWXELQJWRSVLIRU0,77ZLWKSVLRQWKH,$%OHHGRIIWKH
WXELQJWRSVL7HVWWKH,$WRSVLIRU0,7,$%OHHGRIIWKHWXELQJDQGREVHUYH'&.
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
VKHDU&RQILUPFLUFXODWLRQLQERWKGLUHFWLRQVWKUXWKHVKHDUHGYDOYH5HFRUGDQGQRWDWHDOO
SUHVVXUHWHVWVPLQXWHVRQFKDUW
L 1RWHWKLVWHVWPXVWEHZLWQHVVHGE\WKH$2*&&UHSUHVHQWDWLYH
%OHHGERWKWKH,$DQGWXELQJWRSVL
5LJXSMXPSHUIURP,$WRWXELQJWRDOORZIUHH]HSURWHFWWRVZDS
3UHSDUHWRKDQGRYHUZHOOWRSURGXFWLRQ(QVXUHQHFHVVDU\IRUPVILOOHGRXWDQGZHOOKDQGHGRYHU
ZLWKYDOYHDOLJQPHQWDVSHURSHUDWLRQVSHUVRQQHO
5'02,QQRYDWLRQ
L 32675,*:(//:25.
6OLFNOLQH
D &KDQJHRXW*/9SHU*/(1*5
E 3XOOEDOODQGURGDQG5+&
)XOOERUH
D 6KHDUK\GUDXOLFWRHSRUW
&RLO
D 6KLIWLQMHFWLRQVOHHYHVRSHQ
:HOO7LHLQ
3XWZHOORQLQMHFWLRQ
D $2*&&ZLWQHVVHG0,7,$RQFHLQMHFWLRQLVVWDEOH
EHQRWLILHGWR$2*&&IRURSSRUWXQLW\WRZLWQHVV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QQRYDWLRQ5LJ'LYHUWHU6FKHPDWLF
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QQRYDWLRQ5LJ%236FKHPDWLF
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
:HOOKHDG6FKHPDWLF
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
'D\V9V'HSWK
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
)RUPDWLRQ7RSV ,QIRUPDWLRQ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
$QWLFLSDWHG'ULOOLQJ+D]DUGV
´+ROH6HFWLRQ
/RVW&LUFXODWLRQ
(QVXUHDGHTXDWHDPRXQWVRI/&0DUHDYDLODEOH0RQLWRUIOXLGYROXPHVWRGHWHFWDQ\HDUO\VLJQVRIORVW
FLUFXODWLRQ)RUPLQRUVHHSDJHORVVHVFRQVLGHUDGGLQJVPDOODPRXQWVRIFDOFLXPFDUERQDWH
+ROH&OHDQLQJ
0DLQWDLQUKHRORJ\RIPXGV\VWHP6ZHHSKROHZLWKKLJKYLVFRVLW\VZHHSVDVQHFHVVDU\2SWLPL]H
VROLGVFRQWUROHTXLSPHQWWRPDLQWDLQGHQVLW\VDQGFRQWHQWDQGUHGXFHWKHZDVWHVWUHDP0RQLWRU
(&'¶VWRGHWHUPLQHLIDGGLWLRQDOFLUFXODWLRQWLPHLVQHFHVVDU\,QDKLJKO\GHYLDWHGZHOOERUHSLSH
URWDWLRQLVFULWLFDOIRUHIIHFWLYHKROHFOHDQLQJ5RWDWHDWPD[LPXP530¶VZKHQ&%8DQGNHHSSLSH
PRYLQJWRDYRLGZDVKLQJRXWDSDUWLFXODUVHFWLRQRIWKHKROH(QVXUHWRFOHDQWKHKROHZLWKURWDWLRQDIWHU
VOLGHLQWHUYDOV'RQRWRXWGULOORXUDELOLW\WRFOHDQWKHKROH
$QWL&ROOLVRQ
7KHUHDUHQRNQRZQZHOOVZLWKDFOHDUDQFHIDFWRU\7DNHGLUHFWLRQDOVXUYH\VHYHU\VWDQGWDNH
DGGLWLRQDOVXUYH\VLIQHFHVVDU\&RQWLQXRXVO\PRQLWRUSUR[LPLW\WRRIIVHWZHOOERUHVDQGUHFRUGDQ\
FORVHDSSURDFKHVRQ$0UHSRUW
:HOO6SHFLILF$&
x 7KHUHDUHQRZHOOVZLWKDFOHDUDQFHIDFWRURI
:HOOERUHVWDELOLW\3HUPDIURVWUXQQLQJVDQGVDQGJUDYHOFRQGXFWRUEURDFKLQJ
:DVKRXWVLQWKHSHUPDIURVWFDQEHVHYHUHLIWKHVWULQJLVOHIWFLUFXODWLQJDFURVVLWIRUH[WHQGHGSHULRGVRI
WLPH.HHSPXGDVFRRODVSRVVLEOHE\WDNLQJRQFROGZDWHUDQGGLOXWLQJRIWHQ+LJK72+DQG5,+
VSHHGVFDQDJJUDYDWHIUDJLOHVKDOHFRDOIRUPDWLRQVGXHWRWKHSUHVVXUHYDULDWLRQVEHWZHHQVXUJHDQG
VZDE%ULQJWKHSXPSVRQVORZO\DIWHUFRQQHFWLRQV0RQLWRUFRQGXFWRUIRUDQ\VLJQVRIEURDFKLQJ
0DLQWDLQPXGSDUDPHWHUVDQGLQFUHDVH0:WRFRPEDWUXQQLQJVDQGVDQGJUDYHOIRUPDWLRQV
+6
7UHDWHYHU\KROHVHFWLRQDVWKRXJKLWKDVWKHSRWHQWLDOIRU+63%80SDGKDVDKLVWRU\RI+6RQ
ZHOOVLQDOOUHVHUYRLUV,QDGGLWLRQWR+6IURPWKH6FKUDGHUZHOOVLQWKHWDEOHEHORZ6KDGDUHFHQW
SSPVDPSOH
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
7KH$2*&&ZLOOEHQRWLILHGZLWKLQKRXUVLI+6LVHQFRXQWHUHGLQH[FHVVRISSPGXULQJ
GULOOLQJRSHUDWLRQV
7KHULJZLOOKDYHIXOO\IXQFWLRQLQJDXWRPDWLF+6GHWHFWLRQHTXLSPHQWPHHWLQJWKHUHTXLUHPHQWV
RI$$&
,QWKHHYHQW+6LVGHWHFWHGZHOOZRUNZLOOEHVXVSHQGHGDQGSHUVRQQHOHYDFXDWHGXQWLOD
GHWDLOHGPLWLJDWLRQSURFHGXUHFDQEHGHYHORSHG
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
´+ROH6HFWLRQ
+ROH&OHDQLQJ
0DLQWDLQUKHRORJ\RIPXGV\VWHP6ZHHSKROHZLWKORZYLVZDWHUVZHHSV(QVXUHVKDNHUVDUHVHWXS
ZLWKDSSURSULDWHVFUHHQVWRPD[LPL]HVROLGVUHPRYDOHIILFLHQF\5XQFHQWULIXJHFRQWLQXRXVO\0RQLWRU
(&'VWRGHWHUPLQHLIDGGLWLRQDOFLUFXODWLRQWLPHLVQHFHVVDU\,QDKLJKO\GHYLDWHGZHOOERUHSLSH
URWDWLRQLVFULWLFDOIRUHIIHFWLYHKROHFOHDQLQJ5RWDWHDWPD[LPXP530VZKHQ&%8DQGNHHSSLSH
PRYLQJWRDYRLGZDVKLQJRXWDSDUWLFXODUVHFWLRQRIWKHZHOOERUH(QVXUHWRFOHDQWKHKROHZLWKURWDWLRQ
DIWHUVOLGHLQWHUYDOV'RQRWRXWGULOORXUDELOLW\WRFOHDQWKHKROH0DLQWDLQFLUFXODWLRQUDWHRI!
JSP
/RVW&LUFXODWLRQ
(QVXUHDGHTXDWHDPRXQWVRI/&0DUHDYDLODEOH0RQLWRUIOXLGYROXPHVWRGHWHFWDQ\HDUO\VLJQVRIORVW
FLUFXODWLRQ)RUPLQRUVHHSDJHORVVHVFRQVLGHUDGGLQJVPDOODPRXQWVRIFDOFLXPFDUERQDWH
)DXOWLQJ
&URVVLQJIDXOWVNQRZQRUXQNQRZQFDQUHVXOWLQGULOOLQJLQWRXQVWDEOHIRUPDWLRQVWKDWPD\LPSDFW
IXWXUHGULOOLQJDQGOLQHUUXQV7DONZLWK*HRORJLVWWRHQVXUHDOONQRZQIDXOWVDUHLGHQWLILHGDQGSUHSDUHG
IRUDFFRUGLQJO\
+6
7UHDWHYHU\KROHVHFWLRQDVWKRXJKLWKDVWKHSRWHQWLDOIRU+63%80SDGKDVDKLVWRU\RI+6RQ
ZHOOVLQDOOUHVHUYRLUV,QDGGLWLRQWR+6IURPWKH6FKUDGHUZHOOVLQWKHWDEOHEHORZ6KDGDUHFHQW
SSPVDPSOH
7KH$2*&&ZLOOEHQRWLILHGZLWKLQKRXUVLI+6LVHQFRXQWHUHGLQH[FHVVRISSPGXULQJ
GULOOLQJRSHUDWLRQV
7KHULJZLOOKDYHIXOO\IXQFWLRQLQJDXWRPDWLF+6GHWHFWLRQHTXLSPHQWPHHWLQJWKHUHTXLUHPHQWV
RI$$&
,QWKHHYHQW+6LVGHWHFWHGZHOOZRUNZLOOEHVXVSHQGHGDQGSHUVRQQHOHYDFXDWHGXQWLOD
GHWDLOHGPLWLJDWLRQSURFHGXUHFDQEHGHYHORSHG
3%80SDGKDVDKLVWRU\RI+6RQ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
$EQRUPDO3UHVVXUHVDQG7HPSHUDWXUHV
5HVHUYRLUSUHVVXUHVDUHH[SHFWHGWREHQRUPDO8WLOL]H03'WRPLWLJDWHDQ\DEQRUPDOSUHVVXUHVHHQ
$QWL&ROOLVLRQ
7DNHGLUHFWLRQDOVXUYH\VHYHU\VWDQGWDNHDGGLWLRQDOVXUYH\VLIQHFHVVDU\&RQWLQXRXVO\PRQLWRU
GULOOLQJSDUDPHWHUVIRUVLJQVRIPDJQHWLFLQWHUIHUHQFHZLWKDQRWKHUZHOO5HIHUHQFH$&UHSRUWLQ
GLUHFWLRQDOSODQ
:HOO6SHFLILF$&
x 6$$//DQG3%IDLO$&ZLWKDFOHDUDQFHIDFWRU6DQGSDUHQW
OHJVZLOOEHVKXWLQDQGLVRODWHGZLWKDWXELQJWDLOSOXJWRPLWLJDWH+6(ULVN
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QQRYDWLRQ5LJ/D\RXW
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
),73URFHGXUH
)RUPDWLRQ,QWHJULW\7HVW),7DQG
/HDN2II7HVW/273URFHGXUHV
3URFHGXUHIRU),7
'ULOO
RIQHZIRUPDWLRQEHORZWKHFDVLQJVKRHWKLVGRHVQRWLQFOXGHUDWKROHEHORZWKHVKRH
&LUFXODWHWKHKROHWRHVWDEOLVKDXQLIRUPPXGGHQVLW\WKURXJKRXWWKHV\VWHP38LQWRWKHVKRH
&ORVHWKHEORZRXWSUHYHQWHUUDPRUDQQXODU
3XPSGRZQWKHGULOOVWHPDWWRESP
2QDJUDSKZLWKWKHUHFHQWFDVLQJWHVWDOUHDG\VKRZQSORWWKHIOXLGSXPSHGYROXPHRUVWURNHVYV
GULOOSLSHSUHVVXUHXQWLODSSURSULDWHVXUIDFHSUHVVXUHLVDFKLHYHGIRU),7DWVKRH
6KXWGRZQDWUHTXLUHGVXUIDFHSUHVVXUH+ROGIRUDPLQLPXPPLQXWHVRUXQWLOWKHSUHVVXUHVWDELOL]HV
5HFRUGWLPHYVSUHVVXUHLQPLQXWHLQWHUYDOV
%OHHGWKHSUHVVXUHRIIDQGUHFRUGWKHIOXLGYROXPHUHFRYHUHG
7KHSUHGHWHUPLQHGVXUIDFHSUHVVXUHIRUHDFKIRUPDWLRQLQWHJULW\WHVWLVEDVHGRQDFKLHYLQJDQ(0:DW
OHDVWSSJKLJKHUWKDQWKHHVWLPDWHGUHVHUYRLUSUHVVXUHDQGDOORZLQJIRUDQDSSURSULDWHDPRXQWRINLFN
WROHUDQFHLQFDVHZHOOFRQWUROPHDVXUHVDUHUHTXLUHG
:KHUHUHTXLUHGWKH/27LVSHUIRUPHGLQWKHVDPHIDVKLRQDVWKHIRUPDWLRQLQWHJULW\WHVW,QVWHDGRI
VWRSSLQJDWDSUHGHWHUPLQHGSRLQWVXUIDFHSUHVVXUHLVLQFUHDVHGXQWLOWKHIRUPDWLRQEHJLQVWRWDNHIOXLG
DWWKLVSRLQWWKHSUHVVXUHZLOOFRQWLQXHWRULVHEXWDWDVORZHUUDWH7KHV\VWHPLVVKXWLQDQGSUHVVXUH
PRQLWRUHGDVZLWKDQ),7
(QVXUHWKDWFDVLQJWHVWDQGVXEVHTXHQW),7WHVWVDUHUHFRUGHGRQWKHVDPHFKDUW'RFXPHQWLQFUHPHQWDO
YROXPHSXPSHGDQGUHWXUQHGGXULQJWHVW
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
,QQRYDWLRQ5LJ&KRNH0DQLIROG6FKHPDWLF
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
&DVLQJ'HVLJQ
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
´+ROH6HFWLRQ0$63
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
6SLGHU3ORW1$'*RYHUQPHQWDO6HFWLRQV
3DJH
Prudhoe Bay West
M-201 SB Injector
Drilling Procedure
6XUIDFH3ODW$V6WDNHG1$'
6WDQGDUG3URSRVDO5HSRUW
0DUFK
3ODQ0ZS
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
3ODQ0
0
0100020003000400050006000True Vertical Depth (2000 usft/in)-1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000Vertical Section at 320.00° (2000 usft/in)M-201 wp06 HeelM-201 wp06 CP1M-201 wp06 CP1.5M-201 wp06 CP3M-201 wp06 Toe9 5/8" x 12 1/4"4 1/2" x 8 1/2"500100015002000250030003500400045005000550060006500700075008000850090009500100001050011000115001200012500130001350014000145001500015500160001650017000175001800018500190001950019887M-201 wp06Start Dir 3º/100' : 300' MD, 300'TVDStart Dir 4º/100' : 600' MD, 598.77'TVDEnd Dir : 1677.56' MD, 1527.4' TVDFault #1 (40' Throw down to north)Start Dir 4º/100' : 6723.35' MD, 4826.48'TVDEnd Dir : 7719.67' MD, 5175.05' TVDStart Dir 2º/100' : 7819.67' MD, 5176.8'TVDEnd Dir : 8858.57' MD, 5181.2' TVDStart Dir 2º/100' : 10951.92' MD, 5162.21'TVDEnd Dir : 12233.07' MD, 5170.53' TVDStart Dir 2º/100' : 12297.7' MD, 5171.46'TVDEnd Dir : 13917.9' MD, 5188.87' TVDStart Dir 2º/100' : 15749.21' MD, 5200.73'TVDEnd Dir : 16127.17' MD, 5201.8' TVDStart Dir 2º/100' : 17115.41' MD, 5201.8'TVDEnd Dir : 18993.01' MD, 5201.8' TVDTotal Depth : 19887.34' MD, 5201.8' TVDBPRFSV3Ugnu 4AUG3Ugnu MBNAOAOBaHilcorp North Slope, LLCCalculation Method:Minimum CurvatureError System:ISCWSAScan Method: Closest Approach 3DError Surface: Ellipsoid SeparationWarning Method: Error RatioWELL DETAILS: Plan: M-20125.30+N/-S+E/-WNorthingEasting LatitudeLongitude0.000.005974491.02628209.33 70° 20' 18.759 N 148° 57' 34.750 WSURVEY PROGRAMDate: 2022-02-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool26.50 700.00 M-201 wp06 (M-201) GYD_Quest GWD700.00 7820.00 M-201 wp06 (M-201) 3_MWD+IFR2+MS+Sag7820.00 19887.34 M-201 wp06 (M-201) 3_MWD+IFR2+MS+SagFORMATION TOP DETAILSTVDPath TVDssPath MDPath Formation1834.80 1783.00 2147.72 BPRF2791.80 2740.00 3611.40 SV33633.80 3582.00 4899.20 Ugnu 4A3967.80 3916.00 5410.04 UG34892.80 4841.00 6829.42 Ugnu MB5024.80 4973.00 7082.08 NA5142.80 5091.00 7439.02 OA5174.80 5123.00 7707.86 OBaREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: M-201, True NorthVertical (TVD) Reference:M-201 as-staked @ 51.80usftMeasured Depth Reference:M-201 as-staked @ 51.80usftCalculation Method: Minimum CurvatureProject:Prudhoe BaySite:MWell:Plan: M-201Wellbore:M-201Design:M-201 wp06CASING DETAILSTVD TVDSS MD SizeName5176.81 5125.01 7820.00 9-5/8 9 5/8" x 12 1/4"5201.80 5150.00 19887.34 4-1/2 4 1/2" x 8 1/2"SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 26.50 0.00 0.00 26.50 0.00 0.00 0.00 0.00 0.002 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 Start Dir 3º/100' : 300' MD, 300'TVD3 600.00 9.00 270.00 598.77 0.00 -23.51 3.00 270.00 15.11 Start Dir 4º/100' : 600' MD, 598.77'TVD4 1677.56 49.17 314.55 1527.40 300.28 -417.06 4.00 50.97 498.11 End Dir : 1677.56' MD, 1527.4' TVD5 6723.35 49.17 314.55 4826.48 2978.59 -3137.84 0.00 0.00 4298.70 Start Dir 4º/100' : 6723.35' MD, 4826.48'TVD6 7719.67 89.00 316.00 5175.05 3627.69 -3778.50 4.00 2.26 5207.74 End Dir : 7719.67' MD, 5175.05' TVD7 7819.67 89.00 316.00 5176.80 3699.61 -3847.95 0.00 0.00 5307.48 M-201 wp06 Heel Start Dir 2º/100' : 7819.67' MD, 5176.8'TVD8 8858.57 90.52 336.72 5181.20 4559.82 -4420.29 2.00 85.90 6334.33 End Dir : 8858.57' MD, 5181.2' TVD9 10951.92 90.52 336.72 5162.21 6482.70 -5247.49 0.00 0.00 8339.06 Start Dir 2º/100' : 10951.92' MD, 5162.21'TVD10 11041.91 90.00 335.00 5161.80 6564.82 -5284.29 2.00 -106.78 8425.62 M-201 wp06 CP111 12233.07 89.17 311.19 5170.53 7510.45 -5994.40 2.00 -92.05 9606.46 End Dir : 12233.07' MD, 5170.53' TVD12 12297.70 89.17 311.19 5171.46 7553.01 -6043.03 0.00 0.00 9670.32 M-201 wp06 CP1.5 Start Dir 2º/100' : 12297.7' MD, 5171.46'TVD13 13917.90 89.63 343.59 5188.87 8899.63 -6904.48 2.00 89.39 11255.63 End Dir : 13917.9' MD, 5188.87' TVD14 15749.21 89.63 343.59 5200.73 10656.34 -7421.74 0.00 0.00 12933.83 Start Dir 2º/100' : 15749.21' MD, 5200.73'TVD15 16079.38 90.00 337.00 5201.80 10967.00 -7533.00 2.00 -86.79 13243.3316 16127.17 90.00 337.96 5201.80 11011.15 -7551.31 2.00 90.00 13288.92 End Dir : 16127.17' MD, 5201.8' TVD17 17115.41 90.00 337.96 5201.80 11927.14 -7922.21 0.00 0.00 14229.02 M-201 wp06 CP3 Start Dir 2º/100' : 17115.41' MD, 5201.8'TVD18 18993.01 90.00 300.40 5201.80 13322.75 -9127.73 2.00 -90.00 16073.01 End Dir : 18993.01' MD, 5201.8' TVD19 19887.34 90.00 300.40 5201.80 13775.36 -9899.06 0.00 0.00 16915.53 M-201 wp06 Toe Total Depth : 19887.34' MD, 5201.8' TVD
0
750
1500
2250
3000
3750
4500
5250
6000
6750
7500
8250
9000
9750
10500
11250
12000
12750
13500
South(-)/North(+) (1500 usft/in)-9750 -9000 -8250 -7500 -6750 -6000 -5250 -4500 -3750 -3000 -2250 -1500 -750 0
West(-)/East(+) (1500 usft/in)
M-201 wp06 Toe
M-201 wp06 CP3
M-201 wp06 CP1.5
M-201 wp06 CP1
M-201 wp06 Heel
9 5/8" x 12 1/4"
4 1/2" x 8 1/2"10001500175020002250250027503000325035003750400042504500475050005202M-201 wp06
Start Dir 3º/100' : 300' MD, 300'TVD
Start Dir 4º/100' : 600' MD, 598.77'TVD
End Dir : 1677.56' MD, 1527.4' TVD
Fault #1 (40' Throw down to north)
Start Dir 4º/100' : 6723.35' MD, 4826.48'TVD
End Dir : 7719.67' MD, 5175.05' TVD
Start Dir 2º/100' : 7819.67' MD, 5176.8'TVD
End Dir : 8858.57' MD, 5181.2' TVD
Start Dir 2º/100' : 10951.92' MD, 5162.21'TVD
End Dir : 12233.07' MD, 5170.53' TVD
Start Dir 2º/100' : 12297.7' MD, 5171.46'TVD
End Dir : 13917.9' MD, 5188.87' TVD
Start Dir 2º/100' : 15749.21' MD, 5200.73'TVD
End Dir : 16127.17' MD, 5201.8' TVD
Start Dir 2º/100' : 17115.41' MD, 5201.8'TVD
End Dir : 18993.01' MD, 5201.8' TVD
Total Depth : 19887.34' MD, 5201.8' TVD
CASING DETAILS
TVD TVDSS MD Size Name
5176.81 5125.01 7820.00 9-5/8 9 5/8" x 12 1/4"
5201.80 5150.00 19887.34 4-1/2 4 1/2" x 8 1/2"
Project: Prudhoe Bay
Site: M
Well: Plan: M-201
Wellbore: M-201
Plan: M-201 wp06
WELL DETAILS: Plan: M-201
25.30
+N/-S +E/-W Northing Easting Latitude Longitude
0.00 0.00
5974491.02 628209.33 70° 20' 18.759 N 148° 57' 34.750 W
REFERENCE INFORMATION
Co-ordinate (N/E) Reference:Well Plan: M-201, True North
Vertical (TVD) Reference:M-201 as-staked @ 51.80usft
Measured Depth Reference:M-201 as-staked @ 51.80usft
Calculation Method:Minimum Curvature
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0DS6\VWHP
*HR'DWXP
3URMHFW
0DS=RQH
6\VWHP'DWXP866WDWH3ODQH([DFWVROXWLRQ
1$'1$'&21&2186
3UXGKRH%D\1RUWK6ORSH81,7('67$7(6
$ODVND=RQH
0HDQ6HD/HYHO
8VLQJ:HOO5HIHUHQFH3RLQW
8VLQJJHRGHWLFVFDOHIDFWRU
6LWH3RVLWLRQ
)URP
6LWH
/DWLWXGH
/RQJLWXGH
3RVLWLRQ8QFHUWDLQW\
1RUWKLQJ
(DVWLQJ
*ULG&RQYHUJHQFH
075
XVIW
0DS XVIW
XVIW
6ORW5DGLXV
1
:
:HOO
:HOO3RVLWLRQ
/RQJLWXGH
/DWLWXGH
(DVWLQJ
1RUWKLQJ
XVIW
(:
16
3RVLWLRQ8QFHUWDLQW\
XVIW
XVIW
XVIW*URXQG/HYHO
3ODQ0
XVIW
XVIW
:HOOKHDG(OHYDWLRQXVIW
1
:
:HOOERUH
'HFOLQDWLRQ
)LHOG6WUHQJWK
Q7
6DPSOH'DWH 'LS$QJOH
0
0RGHO1DPH0DJQHWLFV
%**0
3KDVH9HUVLRQ
$XGLW1RWHV
'HVLJQ 0ZS
3/$1
9HUWLFDO6HFWLRQ 'HSWK)URP79'
XVIW
16
XVIW
'LUHFWLRQ
(:
XVIW
7LH2Q'HSWK
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
7RRO)DFH
16
XVIW
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
'RJOHJ
5DWH
XVIW
%XLOG
5DWH
XVIW
7XUQ
5DWH
XVIW
3ODQ6HFWLRQV
79'
6\VWHP
XVIW
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
6WDUW'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
%35)
69
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
8JQX$
8*
)DXOW
7KURZGRZQWRQRUWK
6WDUW'LU
0'
79'
8JQX0%
1$
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
2$
2%D
(QG'LU
0'
79'
6WDUW'LU
0'
79'
[
(QG'LU
0'
79'
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
(QG'LU
0'
79'
7RWDO'HSWK
0'
79'
7DUJHW1DPH
KLWPLVVWDUJHW
6KDSH
79'
XVIW
1RUWKLQJ
XVIW
(DVWLQJ
XVIW
16
XVIW
(:
XVIW
7DUJHWV
'LS$QJOH
'LS'LU
0ZS+HHO
SODQKLWVWDUJHWFHQWHU
3RLQW
0ZS&3
SODQKLWVWDUJHWFHQWHU
3RLQW
0ZS&3
SODQKLWVWDUJHWFHQWHU
3RLQW
0ZS&3
SODQKLWVWDUJHWFHQWHU
3RLQW
0ZS7RH
SODQKLWVWDUJHWFHQWHU
3RLQW
30 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS1RUWK6ORSH//&
3UXGKRH%D\
0
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ0
0
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
0DVVWDNHG#XVIW
'HVLJQ0ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFH0DVVWDNHG#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ0
7UXH
9HUWLFDO
'HSWK
XVIW
0HDVXUHG
'HSWK
XVIW
&DVLQJ
'LDPHWHU
+ROH
'LDPHWHU
1DPH
&DVLQJ3RLQWV
[
[
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
'LS
'LUHFWLRQ
1DPH /LWKRORJ\
'LS
)RUPDWLRQV
9HUWLFDO
'HSWK66
2$
8*
2%D
8JQX0%
69
%35)
8JQX$
1$
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
(:
XVIW
16
XVIW
/RFDO&RRUGLQDWHV
&RPPHQW
3ODQ$QQRWDWLRQV
6WDUW'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
)DXOW
7KURZGRZQWRQRUWK
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
7RWDO'HSWK
0'
79'
30 &203$66%XLOG(3DJH
&OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW0DUFK+LOFRUS1RUWK6ORSH//&3UXGKRH%D\03ODQ000ZS5HIHUHQFH'HVLJQ03ODQ000ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD+LJKVLGH5HIHUHQFH:HOO&RRUGLQDWHV1(
1
:'DWXP+HLJKW0DVVWDNHG#XVIW6FDQ5DQJHWRXVIW0HDVXUHG'HSWK*HRGHWLF6FDOH)DFWRU$SSOLHG9HUVLRQ%XLOG(6FDQ5DGLXVLV8QOLPLWHG&OHDUDQFH)DFWRUFXWRIILV8QOLPLWHG0D[(OOLSVH6HSDUDWLRQLVXVIW*/2%$/),/7(5$33/,('$OOZHOOSDWKVZLWKLQ
RIUHIHUHQFH6FDQ7\SH6FDQ7\SH
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
0.001.002.003.004.00Separation Factor0 425 850 1275 1700 2125 2550 2975 3400 3825 4250 4675 5100 5525 5950 6375 6800 7225 7650 8075Measured Depth (850 usft/in)M-14No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:Plan: M-201 NAD 1927 (NADCON CONUS)Alaska Zone 0425.30+N/-S +E/-W Northing EastingLatitudeLongitude0.000.005974491.02628209.3370° 20' 18.759 N148° 57' 34.750 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: M-201, True NorthVertical (TVD) Reference:M-201 as-staked @ 51.80usftMeasured Depth Reference:M-201 as-staked @ 51.80usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2022-02-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool26.50 700.00 M-201 wp06 (M-201) GYD_Quest GWD700.00 7820.00 M-201 wp06 (M-201) 3_MWD+IFR2+MS+Sag7820.00 19887.34 M-201 wp06 (M-201) 3_MWD+IFR2+MS+Sag0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)0 425 850 1275 1700 2125 2550 2975 3400 3825 4250 4675 5100 5525 5950 6375 6800 7225 7650 8075Measured Depth (850 usft/in)M-13M-14M-15M-32GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference26.50 To 19887.34Project: Prudhoe BaySite: MWell: Plan: M-201Wellbore: M-201Plan: M-201 wp06Ladder / S.F. Plots1 of 2CASING DETAILSTVD TVDSS MD Size Name5176.81 5125.01 7820.00 9-5/8 9 5/8" x 12 1/4"5201.80 5150.00 19887.34 4-1/2 4 1/2" x 8 1/2"
&OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW0DUFK+LOFRUS1RUWK6ORSH//&3UXGKRH%D\03ODQ000ZS5HIHUHQFH'HVLJQ03ODQ000ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD+LJKVLGH5HIHUHQFH:HOO&RRUGLQDWHV1(
1
:'DWXP+HLJKW0DVVWDNHG#XVIW6FDQ5DQJHWRXVIW0HDVXUHG'HSWK*HRGHWLF6FDOH)DFWRU$SSOLHG9HUVLRQ%XLOG(6FDQ5DGLXVLV8QOLPLWHG&OHDUDQFH)DFWRUFXWRIILV8QOLPLWHG0D[(OOLSVH6HSDUDWLRQLVXVIW*/2%$/),/7(5$33/,('$OOZHOOSDWKVZLWKLQ
RIUHIHUHQFH6FDQ7\SH6FDQ7\SH
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
0.001.002.003.004.00Separation Factor7500 8250 9000 9750 10500 11250 12000 12750 13500 14250 15000 15750 16500 17250 18000 18750 19500 20250 21000 21750Measured Depth (1500 usft/in)M-200 wp02S-110AS-111S-124S-41S-41ANo-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.NOERRORSWELL DETAILS:Plan: M-201 NAD 1927 (NADCON CONUS)Alaska Zone 0425.30+N/-S +E/-W Northing EastingLatitudeLongitude0.000.005974491.02628209.3370° 20' 18.759 N148° 57' 34.750 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: M-201, True NorthVertical (TVD) Reference:M-201 as-staked @ 51.80usftMeasured Depth Reference:M-201 as-staked @ 51.80usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2022-02-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool26.50 700.00 M-201 wp06 (M-201) GYD_Quest GWD700.00 7820.00 M-201 wp06 (M-201) 3_MWD+IFR2+MS+Sag7820.00 19887.34 M-201 wp06 (M-201) 3_MWD+IFR2+MS+Sag0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)7500 8250 9000 9750 10500 11250 12000 12750 13500 14250 15000 15750 16500 17250 18000 18750 19500 20250 21000 21750Measured Depth (1500 usft/in)S-13AS-13APB1GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference26.50 To 19887.34Project: Prudhoe BaySite: MWell: Plan: M-201Wellbore: M-201Plan: M-201 wp06Ladder / S.F. Plots2 of 2CASING DETAILSTVD TVDSS MD Size Name5176.81 5125.01 7820.00 9-5/8 9 5/8" x 12 1/4"5201.80 5150.00 19887.34 4-1/2 4 1/2" x 8 1/2"
5HYLVHG
75$160,77$//(77(5&+(&./,67
:(//1$0(BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
37'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
BBB'HYHORSPHQWBBB6HUYLFHBBB([SORUDWRU\BBB6WUDWLJUDSKLF7HVWBBB1RQ&RQYHQWLRQDO
),(/'BBBBBBBBBBBBBBBBBBBBBBBBBBBB322/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&KHFN%R[IRU$SSURSULDWH/HWWHU3DUDJUDSKVWREH,QFOXGHGLQ7UDQVPLWWDO/HWWHU
&+(&. 237,216 7(;7)25$33529$//(77(5
08/7,
/$7(5$/
,IODVWWZRGLJLWV
LQ$3,QXPEHUDUH
EHWZHHQ
7KH SHUPLW LV IRU D QHZ ZHOOERUH VHJPHQW RI H[LVWLQJ ZHOO 3HUPLW
1R BBBBBBBBBBBBB $3, 1R BBBBBBBBBBBBBBBBBBBBBBB
3URGXFWLRQVKRXOGFRQWLQXHWREHUHSRUWHGDVDIXQFWLRQRIWKHRULJLQDO
$3,QXPEHUVWDWHGDERYH
3LORW+ROH
,QDFFRUGDQFH ZLWK $$& I DOO UHFRUGV GDWD DQG ORJV
DFTXLUHG IRU WKH SLORW KROH PXVW EH FOHDUO\ GLIIHUHQWLDWHG LQ ERWK
ZHOO QDPH BBBBBBBBBBBBBBBBBBBBBBB3+ DQG $3, QXPEHU
BBBBBBBBBBBBBBBBBBBBBIURPUHFRUGVGDWDDQGORJVDFTXLUHGIRU
ZHOOQDPHRQSHUPLW
6SDFLQJ
([FHSWLRQ
7KHSHUPLWLVDSSURYHGVXEMHFWWRIXOOFRPSOLDQFHZLWK$$&
$SSURYDO WR SURGXFHLQMHFW LV FRQWLQJHQW XSRQ LVVXDQFH RI
D FRQVHUYDWLRQ RUGHU DSSURYLQJ D VSDFLQJ H[FHSWLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBDV2SHUDWRUDVVXPHVWKHOLDELOLW\
RIDQ\SURWHVWWRWKHVSDFLQJH[FHSWLRQWKDWPD\RFFXU
'U\'LWFK6DPSOH
$OOGU\GLWFKVDPSOHVHWVVXEPLWWHGWRWKH$2*&&PXVWEHLQQRJUHDWHU
WKDQ
VDPSOHLQWHUYDOVIURPEHORZWKHSHUPDIURVWRUIURPZKHUH
VDPSOHVDUHILUVWFDXJKWDQG
VDPSOHLQWHUYDOVWKURXJKWDUJHW]RQHV
1RQ
&RQYHQWLRQDO
:HOO
3OHDVHQRWHWKHIROORZLQJVSHFLDOFRQGLWLRQRIWKLVSHUPLW
3URGXFWLRQRUSURGXFWLRQWHVWLQJRIFRDOEHGPHWKDQHLVQRWDOORZHGIRU
ZHOO XQWLODIWHU
KDVGHVLJQHGDQGLPSOHPHQWHGDZDWHUZHOOWHVWLQJSURJUDPWRSURYLGH
EDVHOLQH GDWD RQ ZDWHU TXDOLW\ DQG TXDQWLW\
BBBBBBBBBBBBBBBBBBBBBBBB PXVW FRQWDFW WKH $2*&& WR REWDLQ
DGYDQFHDSSURYDORIVXFKZDWHUZHOOWHVWLQJSURJUDP
:HOO/RJJLQJ
5HTXLUHPHQWV
5HJXODWLRQ$$&DDXWKRUL]HVWKH$2*&&WRVSHFLI\W\SHV
RIZHOOORJVWREHUXQ,QDGGLWLRQWRWKHZHOOORJJLQJSURJUDPSURSRVHG
E\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBLQWKHDWWDFKHGDSSOLFDWLRQ
WKHIROORZLQJZHOOORJVDUHDOVRUHTXLUHGIRUWKLVZHOO
3HU6WDWXWH$6G%DQG5HJXODWLRQ$$&
FRPSRVLWHFXUYHVIRUZHOOORJVUXQPXVWEHVXEPLWWHGWRWKH$2*&&
ZLWKLQGD\VDIWHUFRPSOHWLRQVXVSHQVLRQRUDEDQGRQPHQWRIWKLV
ZHOO
3UXGKRH%D\
3%80
3RODULV2LO
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