Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-145
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-26A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 198-145 50-029-20834-01-00 13057 Conductor Surface Intermediate Liner Liner 9024 80 2723 10924 581 2013 11235 20" x 30" 13-3/8" 9-5/8" 7" 2-7/8" 8658 38 - 118 36 - 2722 35 - 10959 10699 - 11280 11043 - 13056 38 - 118 36 - 2679 35 - 8427 8219 - 8697 8496 - 9024 12720, 12981, 12984 2670 4760 5410 13890 11235, 11257, 11324 5380 6870 7240 13450 11187 - 12720 4-1/2" 12.6# 13cr80, L-80 33 - 11280 8617 - 9028 Structural 4-1/2" Baker S3 Packer 10653, 8183 10485, 10653 8053, 8183 Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907.564.5026 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 33 - 8697 N/A N/A 318 605 39321 42948 20 2 1150 1200 840 1020 N/A 13b. Pools active after work:PRUDHOE OIL 5" Baker HB Packer 10485, 8053 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 8:44 am, Jan 21, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.01.20 11:40:48 - 09'00' Torin Roschinger (4662) WCB 2-11-2025 RBDMS JSB 012825 A.Dewhurst 12FEB25 DSR-1/22/25 ACTIVITY DATE SUMMARY 12/24/2024 T/I/O = 2450/1080/200. Temp = SI. TBG FL (Eline req). No AL. TBG FL @ 11300, ~172 bbls (926 ft below station # 1 @ 10374 ft DMY). Eline in control of well @ departure. 10:30 12/24/2024 T/I/O = 2440/1075/195 (PROFILE MODIFICATION) **Assist E Line** Pump 170 bbls Crude to load TBG. Pad op notified upon departure. E Line in control of well upon departure FWHPs = 530/1060/205 12/24/2024 ***WELL S/I ON ARRIVAL*** (ADPERF / PLUG SET) MIRU HALLIBURTON E-LINE PT 300PSI/3000PSI DHD FLUID SHOT FLUID LEVEL 11300', LRS MIRU AND LOADED 170 BBLS OF CRUDE CORRELATE TO HES CBL DATED 24-MAY-24 PERFORATE WITH 2" MAXFORCE GUN. PERF INTERVAL 11238'-11256' (11232' - 11250' REFERENCE LOG DEPTHS) CCL-TS=9.5', CCL STOP=11228.5'. CONFIRMS SHOTS FIRED ATTEMPT TO SET CIBP @ 11263'. PLUG NOT SET LAY DOWN FOR THE EVENING ***WSR WILL CONTINUE 12/25/2024*** 12/26/2024 ***WELL S/I ON ARRIVAL*** WSR continued from 12/25/2024 PRESSURE TEST 300 LOW 3000 PSI HIGH CORRELATE TO HES CBL DATED 24-MAY-24 SET CIBP @ 11,257' RDMO ***WELL S/I ON DEPARTURE*** 1/14/2025 ***WELL S/I ON ARRIVAL*** (SET PLUG / ADPERF) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH PERFORATE INTERVAL 11193'-11223' (11187' - 11217' REFERENCE DEPTH) WITH 2'' GEO RAZOR 6spf 60 DEG PHASE CCL TO TOP SHOT=8.7' CCL STOP DEPTH= 11184.3'. CONFIRM SHOTS FIRED. SET 2.71" CIBP AT 11235', CCL TO MID ELEMENT=14.3' CCL STOP DEPTH= 11220.7'. TAG AFTER SET PLUG AND GUN CORRELATE TO HES CEMENT BOND LOG DATED24-MAY- 2024 WELL CONTROL DRILL WITH WSL WELL TURND OVER TO DS READY TO POP *** WELL S/I ON DEPARTURE*** JOB COMPLETE Daily Report of Well Operations PBU C-26A PERFORATE INTERVAL 11193'-11223' (11187' - 11217' REFERENCE DEPTH SET 2.71" CIBP AT 11235', 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-26A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 198-145 50-029-20834-01-00 13057 Conductor Surface Intermediate Liner Liner 9024 80 2723 10924 581 2013 11324 20" x 30" 13-3/8" 9-5/8" 7" 2-7/8" 8734 38 - 118 36 - 2722 35 - 10959 10699 - 11280 11043 - 13056 38 - 118 36 - 2679 35 - 8427 8219 - 8697 8496 - 9024 12720, 12981, 12984 2670 4760 5410 13890 11324 5380 6870 7240 13450 11260 - 12720 4-1/2" 12.6# 13cr80, L-80 33 - 11280 8680 - 9028 Structural 4-1/2" Baker S3 Packer 10653, 8183 10485, 10653 8053, 8183 Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907.564.5026 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 33 - 8697 N/A N/A 215 463 17976 32095 1984 4 1050 1100 839 927 N/A 13b. Pools active after work:PRUDHOE OIL 5" Otis HCL Packer 10485, 8053 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:26 am, Sep 24, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.09.24 05:27:54 - 08'00' Torin Roschinger (4662) A.Dewhurst 12FEB25 DSR-9/27/24WCB 10-3-2024 RBDMS JSB 100124 ACTIVITY DATE SUMMARY 9/2/2024 *****WELL FLOWING ON ARRIVAL***** MISU HES 759 *****CONT WSR ON 09/03/24***** 9/3/2024 ***WELL FLOWING ON ARRIVAL*** CONTINUE FROM 09-02-2024 RUN 30' 2.15" DUMMY GUNS @ 11,482' SLM ***WELL SHUT IN ON DEPARTURE*** 9/11/2024 ***WELL S/I UPON ARRIVAL*** MIRU HES RUN GPST/MAXFIRE PRESSURE TEMPERATURE TO 11330' CORRELATE WITH HES MEMORY RADIAL CEMENT BOND LOG 24_MAY-2024 SET NS 2 7/8 CIBP WITH MAXFIRE AT COE 11330',(OFFSET - 22-1 , CCL STOP 11307.8) (TIE DEPTHS), TIE IN LOG IS 6' DEEPER THAN REFERENCE LOG CIBP SET DEPTH WILL BE 11324' DRAW DOWN TEST; INITAL TUBING PRESSURE 2575 PSI BLEED 500 PSI TO 2080 PSI; AFTER 15 MINUTES PRESSURE WAS 2025 PSI; SECURE WELL AND LOCATION FOR THE NIGHT WELL S/I ***CONTINUED ON 12-SEP-2024 WSR*** 9/12/2024 ***CONTINUED FROM 11-SEP-24 WSR*** WELL S/I ON ARRIVAL RIH WITH 10' x 2" GEO RAZOR SPFf/ 60 PHASE OFFSET - 7.6, CCL STOP 11258.4 PERFORATE INTERVAL (TIE DEPTHS) 11266 - 11276') TIE IN LOG IS 6' DEEPER THAN REFERENCE LOG PERF DEPTHS ARE 11260 - 11270. CONFIRM ALL SHOTS FIRED RD ***WELL S/I UPON DEPARTURE*** Daily Report of Well Operations PBU C-26A SET NS 2 7/8 CIBP WITH MAXFIRE AT COE 11330',(OFFSET - 22-1 , CCL STOP ( 11307.8) (TIE DEPTHS), TIE IN LOG IS 6' DEEPER THAN REFERENCE LOG CIBP )( ) SET DEPTH WILL BE 11324' PERFORATE INTERVAL (TIE DEPTHS) 11266 - 11276')TIE IN LOG IS 6' () ) DEEPER THAN REFERENCE LOG PERF DEPTHS ARE 11260 - 11270. () ) CIBP and adperfs are correctly shown on WBS, below. -WCB Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 6/12/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240612 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPI-06 50029228220000 197195 5/2/2024 READ Caliper Survey MPI-09 50029229640000 200103 5/2/2024 READ Caliper Survey PBU B-04A 50029200720100 210095 5/20/2024 HALLIBURTON RBT PBU B-29B 50029215230200 217114 5/20/2024 HALLIBURTON RBT PBU C-26A 50029208340100 198145 5/24/2024 HALLIBURTON RBT PBU D-09A 50029203810100 199085 5/18/2024 HALLIBURTON RBT PBU D-23A 50029207380100 196188 5/18/2024 HALLIBURTON RBT PBU L-295 50029237740000 223115 5/25/2024 HALLIBURTON PPROF Please include current contact information if different from above. T38893 T38894 T38895 T38896 T38897 T38898 T38899 T38900 PBU C-26A 50029208340100 198145 5/24/2024 HALLIBURTON RBT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.12 12:38:22 -08'00' Nolan Vlahovich Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 06/13/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230417 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPU B-21 50029215350000 186023 5/8/2023 HALLIBURTON Jewelry Log MPU B-21 50029215350000 186023 5/12/2023 HALLIBURTON Leak Detection Log MPU B-21 50029215350000 186023 5/13/2023 HALLIBURTON Multi Finger Caliper Report MPU I-04A 50029220680100 201092 4/17/2023 HALLIBURTON Cement Bond Log NS-16A 50029230960100 206141 4/3/2023 HALLIBURTON RBT NS-23 50029231460000 203050 4/25/2023 HALLIBURTON RBT PBU 09-24A 50029214280100 223003 4/9/2023 HALLIBURTON RBT-Coilflag PBU C-26A 50029208340100 198145 3/17/2023 HALLIBURTON Production Profile PBU M-201 50029237110000 222030 5/29/2023 HALLIBURTON Inj. Profile PBU S-32A 50029220990100 212082 5/23/2023 HALLIBURTON CAST CBL PBU S-37A 50029222910100 212092 5/19/2023 HALLIBURTON RBT PBU V-221 50029232460000 205013 5/14/2023 HALLIBURTON Inj. Profile PBU W-04 50029219070000 189008 3/8/2023 HALLIBURTON CAST CBL PBU W-209 50029231700000 203128 5/13/2023 HALLIBURTON Inj. Profile PBU W-219 50029234290000 210105 4/16/2023 HALLIBURTON Inj. Profile PBU Z-223 50029237200000 222080 2/28/2023 HALLIBURTON Inj. Profile SRU 213B-15 50133206540000 215130 4/28/2023 HALLIBURTON Perf Please include current contact information if different from above. T37729 T37729 T37729 T37730 T37731 T37732 T37733 T37734 T37735 T37736 T37737 T37738 T37739 T37740 T37741 T37742T37743 PBU C-26A 50029208340100 198145 3/17/2023 HALLIBURTON Production Profile Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.13 13:09:15 -08'00' Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:198-145 6.50-029-20834-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13057 12989 9026 10485, 10653 12720 None 8053, 8183 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" x 30" 38 - 118 38 - 118 Surface 2723 13-3/8" 36 - 2759 36 - 2709 5380 2670 Intermediate 10924 9-5/8" 35 - 10959 35 - 8427 6870 4760 Liner 581 7" 10699 - 11280 8219 - 8697 7240 5410 Liner 2013 2-7/8" 11043 - 13056 8496 - 9024 13450 13890 Perforation Depth: Measured depth: 11661 - 12720 feet True vertical depth:8919 -9028 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr80 / L80 33 - 11280 33 - 8697 10485 8053Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S3 Packer 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1023750784286 92111920 750 18031 523 462 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9024 Sundry Number or N/A if C.O. Exempt: N/A 5" Baker HB Packer 10653 8183 Junk Packer Printed and Electronic Fracture Stimulation Data 5 Mill CIBP Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028310 PBU C-26A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:54 am, Jun 23, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.06.23 06:58:07 -08'00' Stan Golis (880) SFD 6/23/2021 MGR29JUL2021 13,055 DSR-6/24/21 RBDMS HEW 6/24/2021 SFD 6/23/2021 ACTIVITY DATE SUMMARY 6/4/2021 CTU #6 w/1.75" CT Job Objective: Mill CIBP MIRU CTU, MU T-Bird 2.30" Milling BHA. Open well and L&K with 175bbls of 2% SKL w/SL, RIH w/TBird milling BHA = 2.30" junk mill. Tagged up @ 11,664' ctm. Attempt to mill past w/no success, 25 stalls. Pooh to inspect BHA. ***Job in Progress*** 6/5/2021 CTU #6 w/1.75" CT Job Objective: Mill CIBP Pooh w/milling BHA. Inspect BHA, change out TBird mill. RIH w/TBird milling BHA = 1- 11/16" Drilex motor & 2.30" junk mill (FF). Tag up 11,665' ctm. Begin milling. Milled down to 11,667' with 50 stalls and little motor work. Consulted with OE and decided to POOH and pickup 2-1/8" motor and diamond parabolic mill. POOH and lay down 2.30" junk mill, found wear around the outer edge similar to last run. MU T-bird 2-1/8" milling bha with 2.28" Diamond Parabolic mill. RIH w/BHA, milled through CIBP @ 11,667' ctm, worked mill down to 12,720' ctm, Wt off bttm = 36-38k. Pooh w/BHA. ***Job Complete*** Daily Report of Well Operations PBU C-26A STATE OF ALASKA ',ALASKA OIL AND GAS CONSERVATION COMMI IIIN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate H Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Set CIBP LZ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 198-145 3. Address: P.O.Box 196612 Anchorage, Development Ed Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20834-01-00 7. Property Designation(Lease Number): ADL 0028310 8. Well Name and Number PBU C-26A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: REMIVED Total Depth: measured 13057 feet Plugs measured 11679 feet NOVyy true vertical 9024 feet Junk measured 12981/12984 feet N 21 2017 Effective Depth: measured 10682 feet Packer measured See Attachment feet true vertical 8206 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst Collapse: Structural Conductor 80 20"x 30" 38-118 38-118 Surface 2723 13-3/8"72#L-80 36-2759 36-2709 4930 2670 Intermediate 10925 9-5/8"47#L-80 35-10959 35-8427 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11661-11671 feet 12425-12500 feet 12500-12620 feet 12660-12720 feet True vertical depth: 8919-8923 feet feet 9007-9010 feet 9010-9019 feet 9025-9028 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Q gg 7 Treatment descriptions including volumes used and final pressure: SCANNED 1) `' )�t 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 154 15077 198 380 708 Subsequent to operation: Shut-In 350 20 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development Q Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil H Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Glasheen,Brian P Contact Name: Glasheen,Brian P Authorized Title: Production in r /r7 Contact Email: Brian.Glasheen@bp.com Authorized Signature: I Date: t ( I�v Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/2017 / 157 r g rr� `z ! �� i.d ,,, r _v i! Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary November 20, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Cast Iron Bridge Plug (CIBP) and Addition of Perforations for Well C-26A, PTD # 198-145. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Packers and SSV's Attachment PBU C-26A SW Name Type MD ND Depscription C-26A PACKER 2646.32 2615.2 9-5/8" DV Packer C-26A TBG PACKER 10493.76 8059.49 4-1/2" Baker S-3 Perm Packer C-26A TBG PACKER 10653.34 8183.04 5"TIW HBBP PACKER C-26A PACKER 10989 8451.19 2-7/8" HES RCP Packer • • co - OO) a a ) p r(-0- ctOMMco tOC)) LON. C) ++ 000 ,212000 CON- AT MMM m NI- CD OOO O CA 1- CO CD N. M co ONOCANv- aDO (Nopa) coC) OCOCo MA- 0 CDC) CID (0 W r LC) CAM V CIO M M M N V V- M r r CID COO MW OCACIOMCDcoco M C) CO 0 OO 0 CO r MN0OCOWN . . . . . r r ✓ 0 03 i i i i i i Q CDCA CA M MA- N CO ulCA CO c moo N M M M Cfl CA O MCD CD 00A- 00 • U r r r r r 3 CO 0O 00aaoo aDOao (D ) MCoa • d M b4*# J CO . W * 0 0 •U) N x r `- O N N ▪ O oD az, NCD CO N r r M N r NN — 4 4 J N O 0 NO 0 r W cc 1— coo ▪ U ww com < 2 000 Z w W W W W m m m 0 DZ Z Z Z D D J Uf/) JJJHF- f— • • 00- C7 a) fn W -3 (n N M m 2 II L < X D C a W NO � N d °a U X Z D _ O W N J b -- O if) D C LU DDO ±± LLI � U LL - J -p O W L.L. (Op EL CCp N 0 0 W a) up --1 F- u) , D 0 0 F- - N E _ J U) Q D coz � D = N J = �oci d � � 0 N tp = o- NOO a \ Q O to �73 LL X _• _ _5 cc 2 N M 0 D N 0 D E a = J O .0 O W C� NN0• 0_ Q CL m F- cc Z w az D II OQ OQ W = Z 00 �- 3 Lu d J Z NJ O- ow - � � Z Q � z 0 LU J X J x X J 4) J .71 J L\ d 2LU * N v! 0 3 m = � Q� r)0 U CQ7 CO U w _ . 0 LU * 3 C W J J LL Cr) - - JJ J � 0 --J ,- a W CC U CC -I CO U) � Z U) (/ t Q � Q F- JND D co CU Q c� 2 F- i- a U D _ . w C �O O O 6 D * u) O N Z D F- � L 2 ;_, Q)J Q' W : a C7 I-- J J II ce II * W II Q < _ 0. `L° -o - Qu� O �`•(OODO = Z OZ * 0ml- V0c 0 W `n N OCOap �� � D Z * O N In X N = m N U) W Q U) 0 0 CC2 ? _0 0 Z Q� d N *o �`Om o CC ° CL ,t( 0 � a 0 � ao00c., _ � 0 00- (1 ,-,E o V tbN V 1.0 DJ N a O II JDODWLIJ _1 OF- W F- Q' WOoc _ N2 u) 25 * 0 -' tf) ,- > _W O d >_ X (.0 I.- 0 O W III F-OOI F- 6> II tl M ? C Ca � r' W W « W � V2 aO N � H JW -eh O .p.• d aODP � pp O : � 2F- -- a Uc5' cop JcnUQY >, QD - oho COi C. 0 F- O O Q O c I� N 1- -- -10 -- Lu 0 C01.00 (401- F- `p W --. 0 0 m Z Z > F- J O J cn cn OU) Q U) a O tp N 2 Q re WDZO_ E UW N 2OQ' mm WO '-WW (0 ~ N201 .2 I- 0 -1 ;,,, g -10D>+ < QQD O ON W' � wmD 0 (C) x W W 0 W' 2 WMQ W PW '- (1) .� � � aOM OQ � DoMNOcf.) &3 1 � Cn i i_7.. U_ J � E 2 _ O W O LU LO ' � ry II. � Q CD O W W IL W Z - II 0 -I Z_ W W Z D 0= F_ N Z CD a) Z N LZL c) d �a I�� Z y Z Z U_ .;> W D W J j o O XNLLI2zt Zo ZQQ - OQLI l_ awWFW- OV � ZQQO01 O 2 22 .-- - c J) � I� JJpi0c co OOF—I IIOD = o � � O 0LUimW � - • SOU � v wF- � wwQ � m II o co n = LULU_ 3aZLL � pm -, � UmZa6:: u) Ca' 62EE - moo ? 7i= = az = U) w = ow -J :47p = pzoW o � * : DD « : Z � : F- * : ? EOW W' cp0Q.' i 0 < : 0- CD 0U) := 0— « U_ W D 0 0 0 0 0 0 0 H N v l i (0 cp cp > O N N N N N OO O O O V r r r r Q • • N C O_ r E a� L � d (/) >' U) 0 < • I- T'D N o CO 0a. a. ev a� 0 0 c c� L a) 2 a) O m O TREE= CtM/ • W _LH AD= I►EEV OY SAFETY NOTES: Wel ANGLE >70°011708'. ACTUATOR= BAKER C 1' 2 6A '*'4-1/2CHROME TUBING*** KB.ELEV= 71.71' BF.EL EV= 38.81' - - _ n{� KOP= 2200' 14ix Ae=__.94'@ 12944' ad=MD= 11557 I r 2123' H4-12"HES X PP,D=3.813' Dation TVD= - 8800'SS 20'CONDUCTOR H 114' 2646' 5/8'DV RCR GAS LFT MAPDF8.S 13-3/8'CSG,720,L-80,D=,2.347' H •ST LID TVD DEV TYPE VLV LATCH PORT DATE 4 2980 2887 38 NIG G DOLE RK 16 08/05/08 LI 3 6147 5026 49 NAG SO RIC 20 08/05/08 Minimum ID =2.340" @ 10994' 2 8719 6735 42 WAG DNY RK 0 07/28/08 4-1/2" HES RCP LNR TOP PKR 1 10374 7967 39 IAN RICo 07/28/08 I I 10464' H4-1t2'HES X MP,I)=3.813' aE 0-1 10486' H9-5/8"X 4-12'BKR S-3 PKR,D= 3.875" 4-12'TBG,12.80,13CR-80 VAN TOP, — 10583' 120' N4 12'HES X P8?D=3.813' .0152 bpf,D=3.958' TBG STUB(TAGGED 07/25/08) 1067$' —1 106W1-19-5/8"X 4-1/2"U+OQUE OVERSHOT ' ( 10610' H4-11TOTE XMP,ID=3.813' —'—{ 10632' HBKR PBR SEAL ASSY,D=3.958' 410663' H9-5/8'X 5'BKR H3 PKR,D=?' ff��• -{{{ 10661' —{5'X4-1/TXO,D=3.958' {TOP OF LNR H 10689' { 542....- "..i10899*10H9-5/8"X r BOT LPR HGR,D=? 9-5/8"CSG,478,L-80 MRS,D=8.681' H 10969' Hi • ,-. 1 0984' ---144/2-/2'HES RCP LTP,D=2.340'(10/22/98) TOP OF 2-7/8'LM 11047" am Iliir11043' —13-3/4"3-3/4"&O2 DEPLOY SLV,D=3.00" 4-1/2'TBG,12.60,1-80,.0152 bpf,D=3.958' H 11280' ►•t•4• r►; 4-1/2 11280' '4•P;. 11679' {--{2-a/8'WFDC�(1or26/17) ►.4i RA TAG 11288' ►jt 44114/9 PERFORATION SUMMARY ►• REF LOG SWS MEMORY GIVC*L ON 08/21/98 14 PBTD H 12989' ANGLE AT TOPFERF: 68'®11661' `1+ Note:Refer to Production DB for historical pert data ►A1 -.4�4�1V1' SIZE SPF INTERVAL Opn/Sqz DATE ;11144441.141: .. 2' 6 11661-11671 0 10/25/17 ►4�';4j4+4j i. I �: 2' 4 12425-12500 C 10/30103 ►44411144414111 FISH-FASDRLL DEBRIS 12981 CTM 4NV 1.69" 4 12500-12620 C 0822/98 1�4444444444444• .4.4.4.4,4.1.4 4: (MILLED 09/25/08) 1.69' 4 12660-12720 C 08/22/98 {FISH-FASDRLL DEBRIS 12984' 2-7/8'LNR,6.160,1-80 STL,.0058 bpf,D=2.441' H 13066' 7'LNR,260,L-80/U4S BTRS,.0383 bpf, D=6.278' H 11915' DATE RB/BY COMMENTS DA1E REV BY COMMENTS PRUDHOE BAY UNIT 11/10/82 ORIGOAL COMPLETION 11/26/08 ?MD DRLG DRAFT CORRECTIONS WELL: C-26A 08(04/89 NIBS RWO 12/31/08.-RJM%PJC (E.G DRAFT CORRECTIONS F 1 Pb:'1981450 08/21/98 NORM 1 CTD SIDETRACK(C-26A) 10130/17 KFS/JM)ADPERFS&SET CBP AR No: 50-029-20834-01 07/28/08 D16 RWO SEC 19,T1114,R14E,1646'FML&1037 FTI 0822/08 SVKXSV GLV CID(08/05/08) 10/03/08 SRB/TLH FLUG MUM(09125/08) BP Exploration(Alaska) • • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 +� `'` R�. 14 RECEIVE& Mr. Tom Maunder AUG 31 2 OH Alaska Oil and Gas Conservation Commission on 333 West 7 Avenue Alaska $ G C . �� �. Anchorage, Alaska 99501 4 06h13: till Subject: Corrosion Inhibitor Treatments of GPB C -Pad 1 9 41 `1"`-' Dear Mr. Maunder, 2 _ D.6 1\ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) C -Pad 7/19/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010 C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010 C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010 C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010 C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010 C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010 C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010 C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010 C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010 C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010 C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010 C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010 C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010 C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010 C -16B 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011 C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010 C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010 C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010 C -20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010 C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010 C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010 C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011 C -24A 2040580 500292081601 Sealed NA NA NA NA NA C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010 C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010 C -27B 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010 C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010 C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011 C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010 C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010 C -32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010 C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010 C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010 C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010 C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010 C -378 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010 C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010 C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010 C -41A 2041880 500292238501 Sealed NA NA NA NA NA C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010 Page 1 of 1 • a Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Tuesday, September 30, 2008 3:37 PM To: 'Stewman, Sondra D' Subject: RE: C-26A (198-145) Workover Thanks Sondra, nothing further is needed. Tom From: Stewman, Sondra D [mailto:Sondra.Stewman@bp.com] Sent: Tuesday, September 30, 2008 3:20 PM To: Maunder, Thomas E (DOA) Subject: RE: C-26A {198-145) Workover Good Afternoon Tom, Attached is the data you requested please advise if you require anything further. Have a nice day. Sondra Stewman ADW Drilling Technologist Be real, be present and most of aI~I be I'OSI"TNE! From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Tuesday, September 30, 2008 2:20 PM To: Stewman, Sondra D Subject: C-26A (198-145) Workover Sondra, I am reviewing the 404 submitted for the recen# well work. It appears that there is additional CT work post rig that occurred after 8/25/08. Could you please send in the additional work summary? Email is fine. Thanks, Tom Maunder, PE AOGCC 9/30/2008 STATE OF ALASKA ~ !~ ALA OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERA1~9~ 200$ 1. Operations Performed: ^ Abandon ®Repair Well ~ffCtlCl'6~ ^ Plug Perforations ^ Stimulate Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 198-145 ' 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 _ 50-029-20834-01-00 7. KB Elevation (ft): 71 71 - 9. Well Name and Number: PBU C-26A 8. Property Designation: 10. Field /Pool(s): - ADL028310 ~ Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 13057 • feet true vertical 9022 feet Plugs (measured) 11146' Effective depth: measured 12989 feet Junk (measured) 12984' true vertical 9024 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 143' 20" x 30" 143' 143' Surface 2722' 13-3/8" 2722' 2679' 4930 2670 f ntermediate Production 10959' 9-5/8" 10959' 8427' 6870 4760 Liner 2012' 7" 10699' - 11280' 8219' - 8697' 7240 5410 Liner 2013' 2-7/8" 11043' - 13056' 8496' - 9022' 13450 13890 Perforation Depth MD (ft): 12425' - 12720' Perforation Depth TVD (ft): 9005' - 9027 - 4-1/2", 12.6# 13Cr80 / L-80 11280' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker S3 Packer, 9-5/8" x 4-1/2" Baker HB 10485', 10653' Packer and a 4-1/2" HES RCP Packer & 10994' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®~Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Howard West, 564-5471 N/A Printed Na Sondra Stewman Title Drilling Technologist Prepared By Name/Number: Si nature Phone 564-4750 Date -u¢ "~ ondra Stewman 564-4750 Form 10-4~vised 0412006 ~~ y ~ ~ t ., . Submit Original Only ~ J"~ ~~' ~'~~sc VELLHEAD,=' McEVOY ,CTUATOR~- - _ BAKER B ELEV = 71.71' ~ .F. F1.EV = 38.81' :t3P _ 2200' Max Angle = ~ 94° ~ 1294_4' Tatum MD = 11551' ~ium TV D = 8800` SS DR~ DRAFT 13-3/8" C.SG, 72#, L-80, ID = 12.347.` Nllfllll'IUII (0 = 2.3~{~~. Q~ '~ {)~$'~~ 4-'If2" FIEF RCP LNR T+QP PKR 4-1(2", 12.8#, 13Cr-80, .0152 bpf, ID = 3.958" '~ 083` 1-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" -~-'] ~ {~ TttpuFi#t~ clrr-ss~t. ii I~,~i7 ~ ~~~[Ei,7-25-t}g 17"" BOT LNR HGR W/ TIEBACK SLV { ~ 9-sr8', esG, 47#, L-60, to = s.sa1" ~~ 1Q9~9' i~~-E ~'` TOP OF 2-718" LNR... --~C '~I 4-112'" SCAB INR, 12.6#„ L-80, 01 S2 bpf ID = 3.958'" WHIPSTOCK -~ 11280. RA TAG 11288' PET2FORATK3N SLBUTAAARY REF LOG: SVVS MEMORY GR/CNL ON 08!21198 ANGLEATTOPPERF: 86°,~ 12425' Note: Refer to Production DB far h~stark:al perf data SSE SPF INTERVAL Opn/Sqz DAIS 2" 4 12425 - 12500 C 10/30/03 1.69" 4 12500 -12620 C 08/22198 1.69" 4 12660 -12720 C 08/22198 17" LNR, 26#, L-80, .0383 bfp, ID = 6.276" I .arv`~ i ~ rvv ~ w. rr ~-a..~.. r+e~va,.~: t v ~ i ~ i vv . w~u ~ a... ~ SNOiRSONTt3UL~ OMINGO TQ ~HENOLE (t~ THE RCP C'KR~ 10989' ;~ 123` -~ 4112" HES X I~ple, ID = 3 813" 2645' 9 518" DV PKR GAS LIFT MANDRELS iT MD TVD DEV TYPE VLV LATCH PORT DATE 4 2980 2887 38 MMG DOME RK 16 08/05/0 3 6147 5026 49 MMG SO RK 20 08/05/0 2 8719 6735 42 MMG DMY RK 0 07/28/0 1 10374 7967 39 MMG DMY RK 0 07/28/0 1 fi~~ ~ 112" HES X NIP, ID = 3.813" 1 CI~~` 4112" x 9 518" 53 }'acker 1 ~u2i~` 4-1/2~ HES X NIP, ID = 3.813" 1 C1' 4112" x 9 518" U/M O/shat Batkam 1061 {}` 4-i 12~ OT{S X NIP, ID = 3.813" 1(#631' BKR PBR SEAL ASSY, ~= 3.958" 1€t553' 9-518" X 4112" BKR HB PKR, ID = 4.00" 11, ` S' I- 4-112" HES RCP PKR, ID = 2..340" 11043' 1~3-314" BKR DEPLOY SLV, ID = 3.013.• 11146' 2-7/8" HES FASDRILL (07/08/08) MI~Lt7tf(WINDOW {C-26A} 11280' - 11292` PBTD (--~ 1 FISH, MLED UP BRIDGE PLLiG I~ 129+84' 2-718" LNR, +5.16#, L-80, .005& bpf, ID - 2.441" ~--{ 1305!6` DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY L1NfF 11110!82 ORIGINAL COMpLET{ON WELL: C-26A 06/04/89 N1ES RWO PERMIT Na: X1981450 08/21/98 CTD 51DE1'RA1rK (G.26A) API Na: 50-029-.20834-01 07/28/08 Di& RU11Q SEC 19„ T11 N, Ri 4E, 1645' SNL & 1032' WEL 08/23/t38 SWC/SV GLV C10 (08105108) Exniblation fAtaSkal Page 1 of 2 ~ . 'rlVell: G26 Well History Well Date Summary C-26A 7/7/2008 ****CONT FROM WSR 7/6/08**** (pre rwo) Pll D h/RP FRC] ~ 1 no~o' Ci~yf ,` DRIFTED WITH 2.25" CENTRALIZER, AND SAMPLE BAILER TO 11272' SLM (BAILER EMPTY) ****WELL LEFT SHUT IN, DSO NOTIFIED****** C-26A 7/7/2008 ***WELL SHUT IN ON ARRIVAL*** INITIAL T/I/O = 100 / 0 / 40 PSI. SET 2 7/8" HES FASDRILL AT 11 146 FTMID-ELEMENT. LRS IN PROCESS OF PT'ING PLUG TO 3500 PSI. ***JOB CONTINUED 8-JUL-2008*** C-26A 7/7/2008 T/I/0=100/vac/20 Assist E-line, CMIT Tx IA to 3500 psi (Pre RWO) Pumped 41 bbls crude down Tbg to pressure up Tbg/IA to 2700 psi.'`**Continued on 7-8-08*"' C-26A 7/8/2008 ***CONTINUED FROM 7-JULY-2008*** CMIT TO 3500 PSI -PASS. RIH WITH 3.65" SCP POWERCUTTER CUT 4-1/2" TUBING AT 10.577 FT, MID-JOINT IN FIRST FULL JOINT ABOVE PACKER. FINAL'f11T 0. ***JOB COMPLETE*** C-26A 7/8/2008 ***Continued from 7-7-08*** CMIT TxIA PASSED to 3500 osi (Pre RWO) Pumped 2.5 bbls crude down Tbg to reach test pressures 3500/3400. T/IA lost 60/40 psi in 15 min's, 30/20 psi in 2nd 15 min's for a total of 90/60 psi in 30 min's. Bled back 12 bbls. **Annulus casing valves open to gauges, E'line in control of well on departure** FWHP's= 100/60/50 C-26A 7/12/2008 T/I/0=0/0/0, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Alemite external check installed. Stung into test port (0 psi). Functioned all LDS (Standard), all moved freely. Pumped through void, clean returns. Pressured void to 5000 psi for 30 min test, lost 50 psi in 15 min, lost 0 psi in second 15 min (PASS). Bleed void to 0 psi. PPPOT-IC: Alemite external check installed. Stung into test port (0 psi). Functioned all LDS (Standard), all moved freely. Pumped through void, clean returns. Pressured to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 mins (PASS). Bleed void to 0 psi. C-26A 7/19/2008 T/I/0=0/0/0 Temp= S/I Cric Out (PRE RWO) Complete RU, PJSM with everyone on location, Verified wing and pit valve are S/I, No fluids pumped, -----Job In Progress---- ***WSR Continued to 07-20-08*** C-26A 7/19/2008 T/I/O=SSV/50/25. Temp=Sl. WHP's & OA FL. (for FB). OA FL C~3 36' (<3 bbl). WV, SV &SSV CLOSED. MV OPEN. IA & OA OTG. C-26A 7/20/2008 ***WSR Continued from 07-19-08*** Temp= S/I Circ-Out (PRE RWO) Pumped 5 bbls. meth spear followed with 1112 bbls. 9.3 brine and capped with 38 bbls. diesel for F/P down TBG taking returns up IA, through hardline to choke skid to open top tanks, U-tube TxIA for 1 hr to put F/P in place. CMIT TxIA PASSED to 3500 osi, Pumped 7.3 bbls. 60* diesel down TBG to reach test pressure, T/IA lost 40/20 psi. in 1st 15 min. and 20/10 psi. in 2nd 15 min. for a total loss of 90 psi in 30 min test. Bled back 7 bbls diesel. MIT OA PASSED to 2000,o,i. Pumped 1.3 bbls crude down OA to reach 2000 psi. 3rd test results- OA lost 50 psi in 1st 15 min. and 10 psi in 2nd 15 min. for a total loss of 60 psi in 3o min test. Bled back 2 bbls crude. Final WHP's= 0/0/0 "Operator notified of valve positions as follows Swab= closed, Wing= closed, SSV= closed, Master= open, IA and OA valves open to gauges" C-26A 7/21/2008 Set 4-1/16" CIW BPV# 254 for pre riq. T/I/0= 0/0/0, Set at 96" 1X2' ext used. C-26A 7/23/2008 Pull 4-1/16" CIW BPV after rig pulled on. Pulled at 96" 1X2' ext used. T/I/0= 0/0/0. C-26A 7/24/2008 T/1/O = 0/0/0 Pulled 4-1/16" CIW H TWC C~ 72" thru BOP'S 4-5' ext. used for Doyon 16..no problems. C-26A 7/28/2008 T/I/O = 0/0/0 Pulled 4-1/16" CIW H TWC #201 ~ 108" thru tree for Doyon 16 to complete C-26A 8/2/2008 T/I/0=0/0/0. Pull 4" CIW H BPV. Post_Ria. C-26A 8/5/2008 **** WELL SHUT IN *** (post RWO} PULL BALL & ROD C~ 10 497' SLM FROM STA# 3 C~ 6,139' SLM PULL 1.5" DCR (RKP) FROM STA# 4 @ 2,966' SLM ~iOS~ ~~ " SET 1.5 (RK) GENERIC DESIGN (SEE DATA TAB) PULL 4-1/2" RHC-M PLUG BODY FROM X-NIP C~ 10 505' SLM .BAILER, TIGHT THRU LNR TOP C~ 10,990' SLM (11,005' MD) UNABLE TO PASS 11,075' SLM (11,090' MD) S.BAILER EMPTY ***WELL S/I ON DEP., PAD-OP NOTIFIED OF ALL VALVE POSITIONS*** C-26A 8/20/2008 CTU #9, FCO/Mill Out Plu ;End maintenance at 1300 hrs. Road unit from shop to C-Pad. MIRU CTU #9. Drift coil wi a .Perform weekly BOP test. Shut down operations at 2359 hrs. Night Cohan called out to cover another job. Will re-start job tomorrow AM. Cont' on WSR 8/21/08 ... Page 2 of 2 C-26A 8/21/2008 CTU #9, FCO/MiII~Plug; Cont' from WSR 8/20/08 ... Secure well for the night at 0001 hrs. Re-start job at 0645 hrs. MU and RIH with WFD Motor and Venturi junk basket. Sat down dry at 11109' ctmd. PUH. PU @ 11104' ctmd. Weight 20.5 k#. RBIH, venturi on top of junk. Venturi and burn down to 11119' ctmd. Multiple stalls at 11119' ctmd. Short trip to above liner top. Appear to be see top of liner at 11021' ctmd. RBIH and stall again at 11119' ctmd. Basket may be full. Elect to POOH and inspect tools. Recovered aoorox. 1 cuo of sand. 1 cuo of around uo metal chunks 1/4" x 1/4". tape. and a few chunks o r~Fu.~Ger: on C-26A 8/22/2008 Continued from 08/21/08 WSR. Interact broadcast=yes. MU/RIH w/ WOT 1 11/16" motor/2.25" burn shoe on venturi. Had tags C~3 11021', 11075', 11107', 11110'. Get first stall ~ 11119'. Worked venturi/burn shoe down to 11123' ctmd. Felt like plug may have bro a free. POOH. Recovered junk basket full of metal shards and small meta c unks, brass bits, ss band, and sand. Found a chunk of steal 1/2" thick and the diameter of a half dollar jammed in end of burn shoe. Total of approx. 1 /2 gal of material recovered. Re-dress burn shoe. MU/RIH w/ same 1 11/16" Motor/2.25" burn shoe on venturi. Continued on 08/23/08 WSR. C-26A 8/22/2008 CTU #9, FCO/Mill Plug; Continued from OS/2i/OS WSR. Interact broadcast=yes. MU/RIH w/ WOT 1 11/16" motor/2.25" burn shoe on venturi. Had tags @ 11021', 11075', 11107', 11110'. Get first stall C~ 11119'. Worked venturi/burn shoe down to 11123' ctmd. Felt like plug may have broke free. POOH. Recovered funk basket full of metal shards and small metal chunks, brass_bits~ ss_band, and sand, Found C-26A 8/23/2008 C-26A 8/23/2008 C-26A a chunk of steal 1/2" thick and the diameter of a halt dollar jammed in end of burn shoe. I otal of approx. 1/2 gal of material recovered. Re-dress burn shoe. MU/RIH w/ same 1 11/16" Motor/2.25" burn shoe on venturi. Continued on 08/23/08 WSR. Continued from 08/22/08 WSR. Interact broadcasting=yes. In progress RIH w/ 1.7" motor/venturi w/ 2.25" burn shoe. DrZtag fill C~3 11116' (up). Resume venturi from 11120'-11124' w/one stall. POOH to inspect venturi. Continued from 08/22/08 WSR. Interact broadcasting=yes. In progress RIH w/ 1.7" motor/venturi w/ 2.25" burn shoe. Dry tag fill C«? 11116' (up). Resume venturi from 11120'-11124' w/one stall. POOH to inspect venturi. Recovered full barrel of sand and debris, including a handful of metal chunks and some fiber eading edge. A large chunk of~cored out metal was found jammed into the open end of shoe. Tools sent back to shop for re-build. RBIH with new BHA consisting of same equipment configuration. New burn shoe has a 1 ft. extension added. 8/23/2008 CTU #9, FCO/Mill Plug; Continued from 08/22/08 WSR. Interact broadcasting=yes. In progress RIH w/ 1.7" motor/venturi w/ 2.25" burn shoe. Dry tag fill C~3 11116' (up). Resume venturi from 11120'-11124' w/ one stall. POOH to inspect venturi. Recovered full barrel of sand and debris, including a handful of metal chunks and some fiber material possibly from the plug. Burn shoe extension was fractured with a section broken out of the leading edge. A large chunk of cored out metal was found jammed into the open end of shoe. Tools sent back to shop for re-build. RBIH with new BHA consisting of same equipment configuration. New burn shoe has a 1 ft. extension added. Tag plug/fish C~ 11119'. Begin venturi from 11121' w/ 13 stalls. Continued on 08/24/08 WSR. ' C-26A 8/24/2008 Continued from 08/23/08 WSR. Interact Broadcasting=yes. WOT 1.7" motor/venturi w/ 2.25" shoe, from 11121'. Get 11 more stalls, 25 total this run. POOH to inspect,Recovered partial cup of metal chunks, concave 5-blade junk mill. Tagged and milled at 11122' ctmd. Hard milling with no progress, 10 stalls total. Had several heavy over-pulls. POOH. Found face of mill in relatively good condition. Sides of mill body deeply scarred and gouged. MU/RIH w/ WOT venturi w/2.25" mule shoe (no motor). Tag liner top ~ 11023'. Could not pass. POOH to reconfigure BHA. Continued on 08/25/08 WSR. C-26A 8/24/2008 Continued from 08/23/08 WSR. Interact Broadcasting=yes. WOT 1.7" motor/venturi w/ 2.25" shoe, from 11121'. Get 11 more stalls, 25 total this run. POOH to inspect. C-26A 8/24/2008 Continued from 08/23/08 WSR. Interact Broadcasting=yes. WOT 1.7" motor/venturi w/ 2.25" shoe, from 11121'. Get 11 more stalls, 25 total this run. POOH to inspect. Recovered partial cup of metal chunks, some very large. There was a plastic plug about 1/2" dia X 1.25" long. All recovered material was above the flutter cages. On the burn shoe -all cut rite on the OD and the bottom lip was worn off. RIH with 2.28" concave 5-blade junk mill. Tagged and milled at 11122' ctmd. Hard milling with no progress, 10 stalls total. Had several heavy over-pulls. POOH. Found face of mill in relatively good condition. Sides of mill body deeply scarred and gouged...... Job in Progress ..... C-26A 8/25/2008 Continued from 08/24/08 WSR. Interact Boadcasting=yes. POOH w/ venturi from tag C~ 11023'. Print Date: 8/25/2008 Page 1 of 1 Well Hisfiory Well Qate Summary G26A 8/25/2008 Continued from 08/24/08 WSR. Interact Boadcasting=yes. POOH w /venturi from tag (~ 11023'. G26A 8125!2008 Continued from 08/24/08 WSR Interact Boadcasting=yes. POOH w /venturi from tag C~ 11023' (TOL). RNi w ith venturi on indexing tool. Passed through liner top w ithout aproblem. -Dry tagged dow n at _ 11119' ctmd. Reciprocated and cycled venturi through a fuN 360 degree rotation on o Recovered a small handful of metal bits and pieces. No indication that any of the debris is related to the composite plug. ect to abort job at this time. Well is FP to 1800' w ith 50150 methanol. RD CTU. *** Job hcomp-ete *'"' G26A 9/1/2008 ***WELL S/1 ON ARRNAL*** (post RWO) RAN 2.25" LN3, S/D ~ 10,575' SLM (MP OF POSSN3LE MN_LED X-NIP ~ 10,607 MD) RAN 2 25" CENT. i£ 2.00" LB TO 11 098' WLM APPEARS TO BE FWE SAND RAN MULTIPLE RUN W/ 10'x 2.25" P.BAN.ER TO 11,098', (RECOVERED 1" X 114" METAL, FULL OF FNVE SAND, 4- SMALL METAL CHUNKS) RAN 2.00" Ltf3 TAP DOWN Cat 11.098' SLM IMPRESSION OF WHAT APPEARS TO BE LARGE CHUNK OF METALI RAN 2.25" CENT, 2.15" SUPER MAGNENT (- 1/8 CUP SHAVNGS} CURRENTLY RIH W/ 2.0" STAR BR ***CONTNUE WSR ON 09-02-08*** G26A 9!2!2008 **`CONTNIJED FROM 09-01-08*** (post RWO) NO RETURNS W/ 1.625" HYD.BAN_ER (2.25" BTM) (c~ 11,098'5LM RAN 1.50" SPOON TO FN.L @ 11,098' SLM, METAL MARKS 3.5" ON FACE RAN 5'x 2.25" P.BAN_ER W/ M.SHOE BTM 11,098' SLM (~ 1 CUP COMPOSITE, METAL, & BRASS) RAN 10' X 2 25" P BAN_ER W/ M SHOE BTM TO 11 098' WlM BRASS COMPOSITE NOTFN3~ PAD OP OF WELL STATUS & VLV POStT10NS **** LEFT WELL SHUT NV *** G26A 9/24/2008 CTU #6, Mill FasDrill; MN2U CTU. Perform chain inspection. Change out pack-offs. <CTU is broadcasting.> Perform w eekN BOP test -passed.. RNi w th WFD motor and venturi junk basket w ith a burn shoe extension. Dry tagged dow n at 11095' ctmd. PU clean at 11090' ctmd. BurnedNenturied at 11093' ctmd w ith 10 staAs and no forty and progress. POOH. Recovered a large cup fuN of rrr~tal shavings several nieces of red composite nlua material, and other misc. unidentifiable debris. The fluted burn shoe w as w orn and disfigured as if being forced into a smaller ID. MU and RFi w th motor and 2.28" bullnose 3-blade junk tltill. Drv tag dow n at 11092' ctmd...... Job in Progress ..... G26A 9/24/2008 CTU #G, Mill FasDriN; MN~U CTU. { interACT broadcasting) - Perform chain inspection. Change out pack-offs. Perform w eekly BOP test -passed. RNi w ith WFD motor and venturi junk basket w ith a burn shoe extension. Dry tagged dow n at 11095' ctmd. PU clean at 11090' ctmd. BurnedNenturied at 11093' ctmd w th 10 staNs and no forty and progress. POOH. Recovered a large cup fuN of metal shavings, several pieces of red composite plug material, and other misc. unidentifiable debris. The fluted burn shoe w as w orn and disfigured as if being forced into a smaller N~. MU and Rli w ith motor and 2.28" buflnose 3 -blade junk mill. Dry tag dow n at 11092' ctmd. Motor w ork at 11092' - to 11094'. Push nluq to 1262 ' working thru perfs at 12623'. Continue on 9/25/08 WSR ... G26A 9/25!2008 CTU 6, MNI; Continued from 9/24/08 WSR .. MiHing/Pushing nlua to 1?Q81'stmd . POOH. FP w ell to 2500' w th 50/50 methanol. LD tools. RDMO. Notify PCC / PO of w eN SI status. *** Job complete *** Print Date: 9130/2008 Page 1 of 1 ~ • BP EXPLORATION Page 1 of 5 Operations Summary Report Legal Well Name: C-26 Common Well Name: C-26 Spud Date: 10/17/1982 Event Name: WORKOVER Start: 7/20/2008 End: 7/28/2008 Contractor Name: DOYON Rig Release: 7/28/2008 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 7/22/2008 11:00 - 14:00 3.00 RIGD P POST RDMO and prepare to UD derrick. UD Derrick, remove BOP stack from cellar, install front and rear Booster wheels. 14:00 - 19:30 5.50 RIGD P POST Move rig off pad and across DS 5 access road to West Dock Road. Rig moving System had electric control problems on the access road. Approx 4hrs down time to repair moving system. 19:30 - 00:00 4.50 RIGD P POST Move the rig up West Dock Road. 7/23/2008 00:00 - 02:00 2.00 MOB P PRE Moving rig up the west dock road. 02:00 - 11:00 9.00 MOB P PRE Moving down K pad road. On C-pad access road at 0920-hours. 11:00 - 15:30 4.50 MOB P PRE Remove Boosters from Rig and prepare to spot rig over well. Raise Derrick and R/U rig floor. Wait on 1500-hours Pad Operator changeout before pulling rig onto rig mats and over well. 15:30 - 17:00 1.50 MOB P PRE Move Rig onto rig mats and line up over Tree. 17:00 - 17:30 0.50 KILL P DECOMP Rig up circulating manifold in cellar and install double annulus valve on IA and install full opening 2" valve on OA and run 2" hi-pressure hose to slop tank to vent OA. Spot #2 pump module, take on 8.4 ppg Sw to mud pits. Rig accepted at 17:00 17:30 - 18:30 1.00 KILL P DECOMP Continue to rig up in the cellar and rig up the rig floor, and bridle down. 18:30 - 19:30 1.00 KILL P DECOMP Wait for DSM, R/U Mud Pump #2, Spot Generator Module, Install Bails and Elevators on Top Drive. 19:30 - 20:00 0.50 KILL P DECOMP P/U DSM Lubricator and to t i 20:00 - 20:30 0.50 KILL P DECOMP Pull BPV and UD DSM Lubricator. Wellbore on a Vacuum when BPV was ulled. 20:30 - 23:00 2.50 KILL P DECOMP R/U circulating gear on production tree and pressure tested circulation system to 3,500 psi, no leaks. Pumped 20 bbl Hi-vis sweep followed by 8.4 ppg sea water at 140 deg with pump rate of 8 BPM with 870 psi. Some gas was observed coming from 2" line attached to the OA after 200-Bbls circulation of 140 deg Sea Water. Flow checked wellbore. Well is dead. 23:00 - 00:00 1.00 WHSUR P DECOMP Cameron Well Head technician set 4" CIW type H plug. 7/24/2008 00:00 - 00:30 0.50 WHSUR P DECOMP Pressure test TWC to 1 000 psi from below and 3.50 rom_ 00:30 - 01:30 1.00 WHSUR P DECOMP Bled down control lines, N/D production tree. 01:30 - 02:30 1.00 WHSUR P DECOMP Inspect hanger threads and functioned LDS. Hanger threads in good condition, IBT with 10.5 rounds. 02:30 - 03:30 1.00 BOPSU P DECOMP N/U BOP Stack, attach turn buckles, install flow riser. 03:30 - 04:30 1.00 BOPSU P DECOMP Change out 3.5" x 6" VBRs to 2-7/8"x 5" Rams. 04:30 - 05:00 0.50 BOPSU P DECOMP R/U BOP test equipment and install test plug. 05:00 - 15:00 10.00 BOPSU P DECOMP Pressure test BOPE to 250 si for low test and 3 500 si for hight test, using 2-7/8" test joint for Hydril test. Witness of BOP test waived by AOGCC representative Bob Noble on 7/23/2008 at 18:00 hrs. Change out the Blind-Shear Rams. Restarted the sequence after changing out the Blind shears to Blind Rams. All tests were successful with no bleed-through with the 2-7/8" test joint installed in the Hydril. 15:00 - 15:30 0.50 BOPSU P DECOMP Blow down and R/D test equipment. 15:30 - 17:00 1.50 BOPSU P DECOMP Wait on Wells Support to pull TWC. P/U and installed Dutch riser. P/U, install and test the lubricator to 500-psi. Pull TWC, saw no pressure and the fluid level did not drop below the TWC Printed: 8/25/2008 2:08:34 PM • $P EXPLORATION Page 2 ofi 5 Operations Summary Report Legal Well Name: C-26 Common Well Name: C-26 Spud Date: 10/17/1982 Event Name: WORKOVER Start: 7/20/2008 End: 7/28/2008 Contractor Name: DOYON Rig Release: 7/28/2008 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code N'PT Phase Description of Operations 7/24/2008 15:30 - 17:00 1.50 BOPSU P DECOMP seat in the hanger. 17:00 - 18:00 1.00 PULL P DECOMP P/U landing joint and M/U to XO. RIH and screw into Hanger. M/U Top Drive to landing joint. BOLDS. P/U to 170K-Ibs and Han er comes free ul 18:00 - 19:00 1.00 PULL P DECOMP Start pump and takes 4.6-Bbls to get returns. Circulate Bottoms Up, 10-BPM at 600-psi. 19:00 - 19:30 0.50 PULL P DECOMP Monitor well, change out handling equipment, B/D Top Drive. 19:30 - 21:30 2.00 PULL P DECOMP B/O and UD Hanger and POOH with 4.5" tbg from 10,557' to 8,617', SSSV after joint #49 at 1,960', GLM after joint #79 at 3,160', Recovered 24 clamps and 3 SS Bands, Jt # 24 and 40 missing rubber from clamps. 21:30 - 22:00 0.50 PULL P DECOMP R/D Schlumberger Control line spooler. 22:00 - 00:00 2.00 PULL P DECOMP Continue to UD TBG from 8,617' to 6,177'. 7/25/2008 00:00 - 05:00 5.00 PULL P DECOMP Continue to UD 4.5" Completion. Tubing in generally good shape, slight errosion on the pin ends. Cut jt length=23.01', and the cut joint flare was 4.75" with a clean cut. Recovered 241 full joints, a 20' pup joint at top of string, the cut joint, 1-GLM, 1-SSSV assembly, and all of the control line. 05:00 - 05:30 0.50 PULL P DECOMP Clear and clean rig floor. 05:30 - 07:00 1.50 WHSUR P DECOMP UD tubing handling equipment and R/U for Packoff change out and Dress off BHA M/U. P/U packoff run/pull tool and RIH to pull packoff. P/U new packoff and RIH but packoff lands 4-inches too high. POH and see that there is minor damage to seals, but decide to have Cameron return to shop to get another packoff. Appears that the 9-5/8" casino crew about 4". 07:00 - 08:00 1.00 WHSUR P DECOMP P/U cleanout extension and circulate 5-Bbls of seawater to clean packoff area. Wait on Cameron with new packoff. 08:00 - 08:30 0.50 WHSUR P DECOMP P/U packoff run/pull tool and RIH with new packoff, but lands 4-inches too high. POH with packoff and call for Storm packer and Baker hand to M/U cleanout BHA. ADW Engineer agreed to the backup clan in the RWO program to set Storm Packer to enable ackoff chap eout. 08:30 - 09:00 0.50 WHSUR P DECOMP P/U and install 9" Wear Ring. 09:00 - 10:00 1.00 CLEAN P DECOMP P/U and M/U Dress-off/cleanout BHA: 8-1/8" Dress-off Rotary Shoe, 2-ea extensions, 4-1/2" Dress=off Mill, XO Sxub, 9-5/8" Casing Scraper, Float Bit Sub, Bumper Sub, XO, 6-ea 6-1/4" DCs. 10:00 - 19:00 9.00 CLEAN P DECOMP RIH BHA on DP from Pipe Shed. DP joint #50 RIH at 1150-hours. #75 C~ 1230-hours. #135 ~ 1400-hrs. #190 ~ 1530-hrs. #270 ~ 1730-hours. No loss or pain of fluid to or from the well. 19:00 - 19:30 0.50 WHSUR P DECOMP RIH with storm aaker and set 100' below the well head to t t 19:30 - 20:00 0.50 WHSUR P DECOMP Drain BOP stack, pull wear ring 20:00 - 20:30 0.50 WHSUR P DECOMP Install new 9 5/8" ack off and test to 5 000 si for 30 set 9" wear rino. 20:30 - 21:00 0.50 WHSUR P DECOMP M/U storm packer retrieval tool, RIH with 1 stand DP and nseat storm packer, P/U 2' and let elements relax POOH with 1 stand 21:00 - 21:30 0.50 CLEAN P DECOMP Continue to RIH From 1,098' to 10,446', worked scraper through packer setting area to cover from 10,446' to 10,541'. This area gives you 44' above packer setting area and 51' below packer setting area. Printed: 8/25/2008 2:08:34 PM • • BP EXPLORATION Page 3 of 5 Operations Summary Report Legal Well Name: C-26 Common Well Name: C-26 Event Name: WORKOVER Contractor Name: DOYON Rig Name: DOYON 16 Date From. - To Hours .Task Code NPT 7/25/2008 21:00 - 21:30 0.50 CLEAN P 21:30 - 22:00 0.50 CLEAN P 22:00 - 23:00 1.00 CLEAN P 23:00 - 23:30 0.50 CLEAN P 23:30 - 00:00 0.50 CLEAN P 7/26/2008 00:00 - 04:30 4.50 CLEAN P 04:30 - 05:30 1.00 CLEAN P 05:30 - 06:00 0.50 CLEAN P 06:00 - 08:00 2.00 CLEAN P 08:00 - 14:00 6.00 CLEAN P 14:00 - 16:00 2.00 CLEAN P Spud Date: 10/17/1982 Start: 7/20/2008 End: 7/28/2008 Rig Release: 7/28/2008 Rig Number: 16 Phase Description of Operations DECOMP Continue to RIH to 10,572'. DECOMP M/U to Top Drive at 10,572' and obtain parameters : up weight=212,000#, down weight=135,000, rotating weight=162,000# at 60 rpm with 9,000 ft-Ibs of torque, pumping at 7 bpm with 890 psi. Continued to RIH and tagged stub at ' , P/U 5' and engage rotary go back in hole and begin to dress off with the above parameters on bottom: WOB 5,000#, on bottom torque is 9-12,000 ft-Ibs, dress off tubing to 10,579'. Pull up hole and went back over tubing stub 2x with rotation and 2x without rotation. DECOMP Pump 20 bbl Hi-vis sweep and chase out of hole with 12 BPM and 2,500 psi. DECOMP Monitor well and pump dry job, B/D T/D. DECOMP Lay down one single and POOH from 10,540' to 9,622'. DECOMP Continue to POOH from 9,622' to BHA. DECOMP UD 6-1/4" Drill collar and Dress off BHA. DECOMP Clear and Clean rig floor. DECOMP P/U and M/U BHA to RIH to attem t to ull the RCP Packer: GS Spear, 18-joints of 2-7/8" PAC DP, Jars. DECOMP RIH with RCP Packer Plucking BHA on DP from Derrick. DECOMP P/U stand #106, M/U to Topdrive and start pump. Circulate 1-1/2-BPM at 1700-psi, slowly RIH and see bobble on weight indicator at 10,579'. Continue slowly for stack-out at shear-pin guide. P/U to start rotating at 10-RPM, slowly RIH and look for shear-pin guide stack-out. Set down slowly and shear pins shear at 12K-Ibs. P/U and shut off rotary. Continue RIH with pump at 1 to 1-1/2-BPM, 1700-2300-psi, for stands 107, 108, and 109. Do not see the X-nipple at 10.610'. P/U two singles and continue RIH lookin for RCP acker at 10 9 ' Wellbore Schematic. Made it to 1 7'. 1500-hours: P/U wt 192K, S/O wt 131 K, P/U single, M/U to Topdrive, circulate 1-1/2-BPM, 1000-psi. Continue RIH and packer takes weight aL 10,999', top of the tool~joint on 2nd single. P/U to check, then RIH to same spot and let take 5K on the packer. Stop pump and let Spear relax into catch mode. Work up to 250-K with blocks then to 260K then to max of 280K with 5' of uohola movement 20-repeats. Check pull twice, but no further movement. At 1600-hours: call ADW Engineer and wait on his consult with the Asset. Decision is to release and POH to a position above the stub, then circulate a sweep to remove any 16:00 - 17:00 1.00 CLEAN P DECOMP Start pump to pressure up on spear to release from packer. Spear appears to be plugged. Shut down pump. Slack off quickly and try to unplug spear. Start circulation and able to pump through spear with 2-1/2-BPM at 2500-psi. Release from packer and start to POH. Rack Back one stand and UD 12 joints. 17:00 - 17:30 0.50 CLEAN P DECOMP Drop opening ball for circ sub and pump down, pump out sub opened at 2500 psi. 17:30 - 19:30 2.00 CLEAN P DECOMP Pump 20-Bbl Hi-Vis sweep and chase it at 6-BPM with 3,370 psi, 19:30 - 20:00 0.50 CLEAN P DECOMP Monitor wellbore, pump dry job, B/D top drive. 20:00 - 00:00 4.00 CLEAN P DECOMP POOH UD drill pipe from 10,555' to 4,381'. Printed: 8/25/2008 2:08:34 PM • • BP EXPLORATION Page 4 of 5 Operations Summary Report Legal Well Name: C-26 Common Well Name: C-26 Event Name: WORKOVER Contractor Name: DOYON Rig Name: DOYON 16 Date 7/27/2008 From - To 00:00 - 04:30 Hours Task 4.50 CLEAN Code P I NPT Spud Date: 10/17/1982 Start: 7/20/2008 End: 7/28/2008 Rig Release: 7/28/2008 Rig Number: 16 Phase ~ Description of Operations DECOMP Continue to UD DP through Pipe Shed.. LD 18-jts of 2-7/8" PAC 04:30 - 05:00 05:00 - 05:30 05:30 - 07:00 0.50 0.50 1.50 CLEAN CLEAN BUNCO P P DECOMP DECOMP RUNCMP DP and GS spear. Clear and clean Rig Floor. P/U landing joint and pull wear ring. t 4-1 12.6# 13Cr80 Vam To com letion. Bring Torque turn equipment to rig floor. 07:00 - 12:00 5.00 BUNCO RUNCMP Wait on restoration of the BP Network to build Completion Running Summary. Test casing to 2500-psi to ensure DV tool ha n t shifted when POH with 9-5/8" Casin Scra er. Rock solid test. Prepare and re-strap completion jewelry. Drift hanger and pups. 12:00 - 22:00 10.00 BUNCO RUNCMP PJSM with two Baker techs, Doyon Casing, rig crew and WSL. RIH new 4-1/2', 12.6#, 13Cr80, Vam Top completion. BakerLok all connections below the Baker S3 Packer. Use Jet Lube Seal Guard pipe dope on all connections above the packer and Torque Turn same to 4,440-Ib-ft. Packer through the rig floor at 1300-hours. Joint #60 RIH at 1530-hours. Jt #100 at 1715-hours. Continued in with Completion string to 10,534'. 22:00 - 23:00 1.00 BUNCO RUNCMP Obtain parameters:up weight=150,000#, down weight=115,000#, Continue in with completion P/U jts 246 and 247. ~gaed the first set of shear Dins at 10.589' and stacked at 10 'and stacked 8,000# to shear the pins, No-Go at 10,600'. Set 15,000# down weight confirm No-Go Depth. 23:00 - 23:30 0.50 BUNCO RUNCMP M/U Tubing Hanger and Landing joint, Landed tubing with the ' 2.17' off of tubing stump. No Space out pups needed, layed down joint 247. 23:30 - 00:00 0.50 BUNCO RUNCMP R/U to reverse circulate packer fluids. 7/28/2008 00:00 - 00:30 0.50 BUNCO RUNCMP PJSM, Pressure test all surface equipment to 3,500 psi. Good test. 00:30 - 05:00 4.50 BUNCO RUNCMP Reverse circulate 160 bbls of 140 deg sea water followed by 580 bbl of 120 deg Corrosion Inhibited sea water pumped at 3 bpm with 520 psi. Prepared cellar for N/D and N/U of Tree and Adapter Flange. Installed blind flange on tree, prepared #2 pump module for rig move. 05:00 - 06:30 1.50 BUNCO RUNCMP Droo ball and rod and allow to fall to RHC-M. Pressured unto 3 500 si to set acker and test tubin .Bled off 1.500 psi. Lined uo and pressured unto 3.500 psi on the 06:30 - 07:00 I 0.501 RUN 07:00 - 08:00 1.00 BOPSU P 08:00 - 09:00 1.00 BOPSU P 09:00 - 11:00 2.00 WHSUR P 11:00 - 12:00 1.00 WHSUR P 12:00 - 13:00 1.00 WHSUR P charted, as solid tests. RUNCMP H/U to pump through the DCR shear valve both ways, successfully. Blowdown manifold and Choke/Kill lines. Cameron P/U TWC and install. Prepare to N/D BOP and N/U tree. RUNCMP P/U TWC with dry rod and Cameron_RIH and set in hanger. for good, solid tests. Blowdown all lines. RUNCMP N/D BOPE, set BOP stack back on stump. Clean hanger. RUNCMP N/U Adaptor Flange and Tree. Test neck seal to 5000-psi and hold for 30-charted minutes. Call WTI coordinator to confirm that they could come out for survey. RUNCMP R/U to test Tree. Fill Tree void with diesel. RUNCMP Pressure test Tree to 5000-psi for 30-charted minutes for Printed: 8/25/2008 2:08:34 PM • • BP EXPLORATION Page 5 of 5 .Operations Summary Report Legal Well Name: C-26 Common Well Name: C-26 Spud Date: 10/17/1982 Event Name: WORKOVER Start: 7/20/2008 End: 7/28/2008 Contractor Name: DOYON Rig Release: 7/28/2008 Rig Name: DOYON 16 Rig Number: 16 Date From - To 'Hours Task Code NPT Phase II Description of Operations 7/28/2008 12:00 - 13:00 1.00 WHSUR P RUNCMP rock-solid test. 13:00 - 14:00 1.00 WHSUR P RUNCMP PJSM with DSM Valve crew. P/U lubricator and install and test 0 500- i. Pull TW 14:00 - 15:00 1.00 WHSUR P RUNCMP PJSM with Lil Red to pump Freeze Protect fluid. PT lines to 3500-psi. Reverse Circulate 160-Bbls of diesel. 15:00 - 16:00 1.00 WHSUR P RUNCMP Line up IA to the Production Tree and allow well to U-Tube, Work on Rig Move Check list. 16:00 - 17:00 1.00 WHSUR P RUNCMP Confirm well is dead and dry rod the BPV, Test BPV to 1,000 psi for10 minutes using Little Red. 17:00 - 18:00 1.00 WHSUR P RUNCMP B/D lines in cellar and remove Double annulus valve and secure well. Rig Released at 1800 hrs. Printed: 8/25/2008 2:08:34 PM Schlumberger 09/10/07 NO. 4406 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 ATTN: Beth sGANt!W S£P 1: ß 7J'/ù7 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 e 0 og escrlpnon ae o or 17-14 N/A JEWELRY/SBHP MMf\- I ~4 - (,C- 08/17/07 1 MPC-10 11767137 MEM INJ PROFILE I )T{\ l"5cÇ _('")/< 08/13/07 1 17-01 11824337 SBHPS/JEWELRY LOG ¡"ill'> -O5".~ 08/15/07 1 P2-30 11686776 PRODUCTION PROFILE I C) ~ - ("')Cì.~ 08/25/07 1 L 1-31 11865639 LDL IC>.~ 1_ ',~ 08/14/07 1 P2-10 11846804 PRODUCTION PROFILE Iq~ -1'A"+ 08/17/07 1 17-03A N/A JEWELRY/SBHP ¡CV+- !J./t_ 08/17/07 1 C-26 11824342 LDL It:t<í( - IL./~ 08/22/07 1 15-07C 11594517 SBHP SURVEY ~f"'I?-.- Oq~ 08/23/07 1 D-04B 11591451 SBHP SURVEY ;J ö3 - II D 08/24/07 1 P2-24 11865643 PRODUCTION PROFILE lot'$( - ('\C")"!< 08/21/07 1 P2-03 11855502 PRODUCTION PROFILE /C\~ - ~t../ 08/19/07 1 09-44 11855501 SBHP/JEWELRY ¡O¡f..... - Q(~ 08/16/07 1 09-23 11824337 SBHP/JEWELRY I~-~ 08/16/07 1 2-52/S-41 11846807 PRODUCTION PROFILE 14;':, - f'\~ ~ 08/18/07 1 F-08A 11638646 USIT :>A~ -0 06/28/07 1 02-16C 11628790 SCMT dbr-()7't5 08/24/07 1 L2-32 11695060 RST Ü".r:l', I""~ -I~-:} .. I,"'" /4 (~ OS/23/07 1 1 L5-09 11492259 RST /Cjl"> - ¡:J'-I *- I<~/":J. 11/11/06 1 1 02-12B 11767132 MCNL ¡:::)f"'I~ -~~ .... '''''''.~, 06/21/07 1 1 18-09B 11366500 MCNL 1'\'11-- fr.-* #. t."'\41C, 1 0/23/06 1 1 G-14A 11485777 MCNL Io,'i' -()~-.¡ 'it L"L/~ 11/27/06 1 1 05-20B 10942220 MCNL :J nLI - ::r~ </ it- 1."\<-/.0 1 06/26/05 1 1 WI! J b# L D . f PLEASE ACKNOWLEDGE RECEIPT BY SI!3,'~!~."'.".'."~"''''. ;",~. r.... P. ;~~..;,,~.Ir1P.... {' NE COPY EACH TO: BP Exploration (Alaska) Inc. ,,,' I, 0 ~.., \1 'If i;)..,,", ILl Petrotechnical Data Center LR2-1 vI.",... "-' '~"- 900 E. Benson Blvd. Anchorage. Alaska 99508 ('CD Î dl 007 ,)1_1 j, ' , Date Delivered: " '. t·,>, fI C'I" ('0"', \,()I\IIIÚ,,:')10r. }\1~0.!3\<:~;,,_ií1 {'}:J' ~~~,' ,,, D t Field: Prudhoe Bay Endicott C I CD . BL . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 A~_,.. AK ""'-~ ATTN: Beth 1. Received bY:(!,A.' A-- . STATE OF ALASKA A AL.A1 OIL AND GAS CONSERVATION COMr210N REPORT OF SUNDRY WELL OPERATIONS D D D 1. Operations Abandon D Repair Well 0 Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 71.71 KB 8. Property Designation: ADLO-028310 11. Present Well Condition Summary: Total Depth measured true vertical 13055 9022 Effective Depth measured 12991 true vertical 9024 Casing Length Size Conductor 80' 20" 91.5# H-40 Liner 54' 2-7/8" 6.16# L-80 Liner 2013' 2-7/8" 6.16# L-80 Liner 581' 7" 26# L-80 Production 10928' 9-5/8" 47# L-80 Surface 2690' 13-3/8" 72# L-80 Perforation depth: Measured depth: 11425' - 12720' True Vertical depth: 8802' - 9027' Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations X Oil-Bbl 419 Shut in Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development P' Stratigraphic feet feet l'ftfJh StimulateD Other D Patch Tubing WaiverD Time ExtensionD Re-enter Suspended Well D 5. Permit to Drill Number: 198-1450 Exploratory Service 6. API Number: 50-029-20834-01-00 9. Well Name and Number: PBU C-26a 10. Field/Pool(s): R PRUDHOE BAY Field/ PRUDHOE OIL Pool E Plugs (measured) SCANNED JAN OJUŠkZOÐ,Ured) DEe 2 ' Non~/as~i o. 8 2006' 12984 il & Gas Co Anchorans. Comrnis ge Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 17685 16 0 o 0 0 15. Well Class after proposed work: Exploratory Development P 16. Well Status after proposed work: Oil P' Gas WAG feet feet MD 33' - 113' 10989' - 11043' 11 043' - 13056' 10699' - 11280' 31' 10959' 32' - 2722' - - 4-1/2" 12.6# 9-5/8" DV Packer 4-1/2" Baker HB Packer 2-7/8" HES RCP Packer o 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Signature TVD 33' - 113' 8451' - 8496' 8496' - 9022' 8219' - 8697' 31' - 8427' 32' - 2679' Collapse 470 13890 13890 13890 4760 2670 Burst 1490 13450 13450 13450 6870 4930 - - L-80 30' - 11280' 2646 10653 10989 o Tubing pressure 945 o Service WINJ WDSPL Title Data Manager Phone 564-4944 Date 12/20/2006 ".! fl. \(~ Submit Original Only . . C-26A DESCRIPTION 0 F WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 12/11/2006 BEGIN RIG UP FOR 28' BAKER TUBING PATCH ***CONTINUED 12-DEC-2006*** 12/12/2006 **CONTINUED FROM 11-DEC-2006** 28' BAKER PATCH SET IN 4.5" TUBING FROM 6650-6678 FT. DEVIATION AT PATCH SET 52 DEGREES. DEPTH CORRELATED TO SLB LDL DATED 7-JUN-2006 OAL OF PATCH IS 37', MIN I.D. IS 2.45" ***JOB COMPLETE*** FLUIDS PUMPED BBLS I 1 DI ESEL 1 TOTAL Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth tcr 7f ,.IL¡'~CI\NNEO SEP 1 Ii 2005 NO. 3941 Company: ,..,-~...-...-." ) r\. ¡p^ ". ,_, "'. .~J...j 08/28/06 J. '" 4VUÔ ~ÐiI 8. Gas Cons, CommiU(œ "'nchorage State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 W D BL Field: Prudhoe Bay CD ell Job og escrlptlon ate o or C-11A 11225983 LDL 07/02/06 1 B-25 11217247 LDL 05/11/06 1 F-06A 11258688 PROD PROFILE W/DEFT 03/20/06 1 G-18A 11209612 MEM INJECTION PROFILE 07/19/06 1 P-24 11216206 MEM INJECTION PROFILE 07/06/06 1 B-28 11221590 LDL 07/04/06 1 B-01 11211508 PROD LOG W/DEFT 06/23/06 1 W-39A 11216197 MEM PROD PROFILE OS/29/06 1 Z-02A 11212856 INJECTION PROFILE 05/02/06 1 G-03A 11211493 LDL OS/24/06 1 C-26A 11225979 LDL 06/07/06 1 F-26B N/A MEM PROD & INJECTION 06/06/06 1 F-26B N/A MEM BORAX LOG 06/06/06 1 W-39A 11216197 MEM BORAX LOG OS/29/06 1 F-04A 11221602 SCMT 08/18/06 1 Y-08A 11221604 SCMT 08/20/06 1 C-06B 11212883 US IT 08/15/06 1 X-27 11217274 US IT 08/26/06 1 K-07D 10942217 MEMORY SCMT 06/15/05 1 Y-10A 11209611 MEM INJECTION PROFILE 07/18/06 1 F-12 11225984 LDL 07/02/06 1 K-07D 11058256 SBHP SURVEY 11/28/05 1 X-04 10919925 PROD PROFILE W/DEFT 12/15/04 1 A-30A 11054295 CH EDIT OF PDC LOG W/GR 04/06/05 1 17-04B 40010183 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 03/09/04 1 1 Z-30A 40010092 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 01/27/04 1 1 17-04B PB1 40010183 OH EDIT OF MWD/LWD 03/08/04 2 1 # L D Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 CI . . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth C-26A (PTD #1981450) Classified as Problem Well . - All, Well C-26A (PTD #1981450) has been found to have sustained casing pressure on the IA. The TIO pressures were 2380/2220/350 on 05/18/06 when a TIFL failed. Tubing and IA pressures tracked. The plan forward for this well is as follows: 1. DHD: TIFL - FAILED 2. SL: Changeout GL V 3. DHD: Re- TIFL ~ t:" ,þ.!." \:0.' A wellbore schematic has been included for reference. «C-26A.pdf» The well has been classified as a Problem well. Please call if you have any questions. The well may remain online as slickline and diagnostic testing is completed. Thank you, }lnna (j)u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: C-26A.pdf C-26A.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 5/30/2006 4:27 PM TREE = WB..LHEAD = A CTUA TOR = KB. ELEV = BF. ELEV - KOP- Max Angle = Datum MD = Datum TVD - 4" FIIIC IIIk:BlOY BAKER 71.71' 38.81' 2200' 94 @ 12944' 11552' 8800' SS C-26A SAFETY NOTES: WELL ANG.E> 70° @ 11708' & > 90° @12077'. NOTE: MAY ENCOUNTER PROBLEMS WI SQUARE SHOUlDERS ON TOOLS COMING OUT OF THE HOLE @ THE RCP PKR@ 10989' . 1983' 4-1/2" OTIS SSSVN, 10 = 3.813" 13-318" CSG, 72#, L-80, 10 = 12.347" GAS LIFT MA NDRELS MD TVD OBI TYPE VLV LATa; PORr DATE 3195 3047 43 CAM SO RK 20 06/12/03 Minimum ID = 2.340" @ 10989' ~1~"HESRCPLNRTOPPKR 4-1/2" lBG, 12.6#, L-BO, .0152 bpf, D = 3.958" 10631' 10610' 10631' 4-lIZ' OTIS X NP, 10 = 3.813" 10653' 9-5/8" X4-1/2" BKRHB PKR, D _4.00" 7" BOTLNR HGRWITIEBACK SLV 10699' 10989' 4-lIZ' HES RCP PKR, 10 = 2.340" 1 0959' 9_5/8" LNR, 47#, L-80, .0732 bpf, D = 8.681" DATE 11/11/82 06104189 08121/98 08129/01 11/04/02 05129/03 3-3/4" BKR LNR DEA..OY SLV, 10 = 3.00" 4-lIZ' SCA. B LNR, 12.6#, L-80, .0152 bpf, 10 - 3.958" TOPOF2-7/8"LNR, 6.16#, 10=2.372" I 4-11'2" & 7" MILLOUT WINDOW 11280' - 11292' 11530' PERFORATION SUMMARY REF LOG: SWSMEMORY GRlCNLON08l21/98 ANGLEATTOPPERF: 88@ 12500' Note: Refer to A-oduction DB for hisrorical perf data SIZE SPF INTERVAL OpnlSqz C\ð.TE 2" 4 12450 - 12500 0 10130/03 1.69" 4 12500 -12620 0 081'22/98 1.69" 4 12660 -12720 0 081'22/98 I ASH, MlLED UP BRIDGE A..UG 2-7/8" LNR, 6.16#, L-80, .0058 bpf, 10= 2.441" 7" LNR, 26#, L-80, 10 = 6.276" 11915' REV BY COMMENTS ORIGINAL COMPLETION RWO CTD SIDETRACK a;/KAK CORRECTIONS ?B/TP GLV ao BJM/TLP SET FAS DRlL BRIDGE PLUG REV BY COMMENTS SRBlTLP CORRECTIONS TO ORA WING JMlKA K GL V C/O KSBlTLP ADD PERF / SAFETY NOTE PRUDHOE BAY UNIT WB..L: C-26A ÆRMIT No: 1981450 API No: 50-029-20834-01 SEC 19, T11 N, R14E, 1645' SNL & 1032' WEL DATE 06/03/03 06/12/03 10/30/03 BP EKploration (Alaska) F~ECE'VE:[') STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 2 5 2004 REPORT OF SUNDRY WELL OPERAklil(j)NScon~. Cmpm¡)~ion 1. Operations Performed: Abandon 0 Alter Casing 0 Change Approved Program 0 2. Operator Suspend 0 Repair Well 0 Pull Tubing 0 Operation Shutdown D Plug PerforationsD Perforate New Pool 0 4. Current Well Class: .qr,lJraol? Perforate ŒJ WaiverO Stimulate 0 Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 198-1450 OtherD Name: BP Exploration (Alaska), Inc. 71.71 8. Property Designation: ADL-0028310 11. Present Well Condition Summary: Stratigraphic 0 9. Well Name and Number: C-26A 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Exploratory 0 Service 0 6. API Number 50-029-20834-01-00 Development ŒJ 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Total Depth measured 13055 feet Plugs (measured) Junk (measured) None true vertical 9022.4 feet Effective Depth measured 12991 feet true vertical 9024.2 feet 12984 Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 33 113 33.0 - 113.0 1490 470 Liner 581 7" 26# L-80 10699 - 11280 8219.0 - 8696.9 7240 5410 Liner 54 2-7/8" 6.16# L-80 10989 - 11043 8451.2 - 8495.9 13450 13890 Liner 2013 2-7/8" 6.16# L-80 11043 - 13056 8495.9 - 9022.4 13450 13890 Production 10928 9-5/8" 47# L-80 31 - 10959 31.0 - 8426.6 6870 4760 Surface 2690 13-3/8" 72# L-80 32 - 2722 32.0 - 2678.7 4930 2670 Perforation depth: Measured depth: 11425 -11500,12425 -12500,12500 -12620,12660 -12720 True vertical depth: 8802.12 - 8845.21,9004.87 - 9008.36,9008.36 - 9017.91,9023.04 - 9026.76 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 30 11280 Packers & SSSV (type & measured depth): 2-7/8" HES RCP Packer 4-1/2" Baker HB Packer 9-5/8" DV Packer @ 10989 @ 10653 @ 2646 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Iniection Data 13 Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure 545 15.5 19 500 910 452 18.6 16 455 1582 14. Attachments: 15. Well Class after proposed work: Exploratory 0 Development ŒJ ServiceD Printed Name 16. Well Status after proposed work: Operational Shutdown 0 OilŒJ GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Copies of Logs and Surveys run - Daily Report of Well Operations - X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact ~~ ")J wuu~ 1 @ 2~ Production Technical Assistant Signature Phone 564-4657 Date 2/24/04 Form 10-404 Revised 12/2003 ,ORIGINAL C-26A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/28/03 MILL OBSTRUCTION/PERFORATING. RIH W/ 2.3" TAPERED MILL. MILL THROUGH OBSTRUCTION FROM 11046' - 11053'. CONTINUE RIH, TIGHT SPOTS @ 11844, 11920, AND 11940'. RIH WITH SWS MEMORY GAMMA/CCL LOGGING TOOLS IN 2.20" CARRIER & 2" JSN. JET LNR RUNNING IN THE HOLE FROM 11350' TO 12720' CTMD. LOG FROM 12720 TO 11600' CTMD. <FLAGGED PIPE AT 12400'>, POOH. 10/29/03 CTU #5, COIL FLAG/ADD PERFS. -CONTINUED-. PULLING OUT OF THE HOLE AFTER TIE IN LOG, FLAG AT 11400' CTMD. HUNG UP AT THE BOTTOM OF THE RCP PKR. ABLE TO WORK PAST BY HITTING IT FAST & HARD. POOH. <CORRECT FLAG TO SWS CNL DATED 8/26/98>. PERFORATED 75' WI 2" X 25,2006 PJ, 4 SPF GUNS. (12,425' TO 12,500'). FLUIDS PUMPED BBLS I 285 . Methanal 285 . TOTAL Page 1 TREE = 4"FtvC W B..LI-EAD = rvt: BI OY A CTUA TOR = BAKER KB. ELEV = 71.71' BF. ELEV = 38.81' KOP= 2200' Max Angle = 94 @ 12944' Datum MD = 11552' DatumTVD = 8800' SS C-26A SAFETY NOTES: WELL ANGLE> 70° @ 11708' & > 90° @ 12077'. NOTE: MAY ENCOUNTER PROBLEMS WI SQUARE SHOULDERS ON TOOLS COM ING OUT OF THE HOLE @ THE RCP PKR @ 10989' (8 13-3/8" CSG, 72#, L-80, ID = 12.347" Minimu m ID = 2.340" @ 10989' 4-112" HES RCP LNR TOP PKR 4-1/2" TBG,12.6#, L-80, .0152 bpt, D =3.958" 10610' 10631' 10631' T' BOTLNR I-K3RW/TIEBAO< SLY I 19-5/8" LNR, 47#, L-80, .0732 bpt, D = 8.681" I 10699' 1 TOP OF 2-7/8" LNR, 6.16#, ID = 2.372" I I PERFORATION SUMMA RY RB= LOG: SWS MEfv10RY GRlCNL ON 08121/98 ANGLEATTOPPERF: 88@ 12500' Note: Reter to A'oduetion DB tor historieal pert data SIZE SPF INTERV A L Opn/Sqz DATE 2" 4 12450 - 12500 0 10130/03 1.69" 4 12500 -12620 0 08/22/98 1.69" 4 12660 -12720 0 08/22/98 1983' 4-1/2" OTS SSSVN,ID = 3.813" GAS LIFT MA NDRELS TVD DBI TYPE VL V LA Ta-i PORr DATE 304 7 43 CAM SO RK 20 06/12/03 4-1/2" 011S X NP,ID=3.813" 9-5/8" X 4-1/2" BKR HB PKR, D = 4.00" 4-1/2" HES RCP PKR, ID = 2.340" 3-3/4" BKR LNR DEROY SLY, 10 = 3.00" I 4-1/2"&7"MILLOUTWINDOW 11280'-11292' 1 RSH, MLLBJ LP BRIDGE RUG I 2-7/8" LNR, 6.16#, L-80, .0058 bpt, ID = 2.441" -1 13056' I T' LNR, 26#, L-80, ID = 6.276" 11915' DATE REV BY COMMENTS DATE REV BY COMMENTS 11/11/82 ORIGINAL COMPLETION 06/03/03 SRB/TLP CORRECTIONS TO DRA WING 06104189 RWO 06/12/03 JM/KAK GL V C/O 08121/98 CTD SIDETRACK 10/30/03 KS BlTLP ADD PERF / SAFETY NOTE 08129/01 a-i/KA K CORRECllONS 11/04/02 ?B/W GLV C/O OS/29/03 BJ M/TLP SEr FAS DRLL BRIOOEPLUG PRUDHOE BAY UNIT WB..L: C-26A ÆRMT No: 1981450 API No: 50-029-20834-01 SEC 19, T11 N, R14E, 1645' SNL & 1032' WEL BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abanonr-~ Suspend[~ Operation Shutdown F"] Perforate[--~ VadanceF-~ Annuar DisposalE~] After Casincl[~ Repair Well[] Plu~ PedorationsD stimulate~ Time E~ensionD OtherD Change Approved Program~ Pull Tubing~ Pedorate New Pool~ Re-enter Suspended Well~ LINER LAP SQZ 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. Development ~ Explorato~ 198-145 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic ~ Se~ice ~ 50-029-20834-01-00 7. KB Elevation (fi): 9. Well Name and Number: 71.71 C-26A 8. Prope~y Designation: 10. Field/Pool(s): ADL 028310 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. Present Well Condition Summa~: Total Depth measured 13056 feet true ve~ical 9022 feet Plugs (measured) Tagged TD ~ 10820' (02/10/1997). Effective Depth measured 12984 feet Junk (measured) IBP Element ~ 10888'. true ve~ical 9025 feet Cas in g Length Size M D TV D B u rst Col lapse Conductor 110' 20" 143' 143' 40K 520 Sudace 2689' 13-3/8" 2722' 2722' 80K 2670 Intermediate 10926' 9-5/8" 10959' 8427' 80K 4760 Liner 593' 7" 10699'-11292' 8219'-8707' 80K 7020 Sidetrack Liner 1942' 2-7/8" 11044'-12986' 8497'-9025' 80K 11160 Pedoration depth: Measured depth: Open Peals 12500'-12620', 12660'-12720' True ve~ical depth: Open Peals 8937'-8946', 8950'-8955' Tubing: ( size, grade, and measured depth) 4-1/2" 12.6~ L-80 TBG ~ 10653'. 4-1/2" Tail Pipe ~ 11280'. Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" Baker HB Packer ~ 10653'. ' 4-1/2" Otis SSSV Nipple ~ 1983'. JUL 12. Stimulation or cement squeeze summaw: Treatment descriptions including volumes used and final pressure:~:~.~ ~: 13 Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SHUT-IN Subsequent to operation: 855 32000 32 875 14. Attachments: 15. Well Class after proposed work: Exp,orato~Q Development~ Se~iceQ Copies of Logs and Su~eys run ~ 16. Well Status after proposed work: oi~ GasU WAGQ G,NJU Wi,JU WDSPLQ Daily Repo~ of Well Operations ~X 17. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge, lSund~ Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr ~ N/A Printed Name DeWayne R. Schnorr Title Techical Assistant Signature ~~~ ~~~ Phone 907/564-5174 Date June l6, 2003 Form 10-404 Revised 2,2003 ~S "FL JUL ~ ~ t~ ~n~' 3Ur 05/21/2OO3 05/26/2003 O5/28/2OO3 O5/29/2O03 05/30/2003 06/02/2003 06/03/2003 06/11/2003 05/21/03 O5/26/03 O5/28/03 05/29/03 05/30/03 C-26A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE CEMENT SQUEEZE :DRIFT/TAG : IN]ECTIVITY TEST : AC-FLUID LEVEL : PACKER PLUG : CEMENT SQUEEZE : MILL; MIT-T :MILL :DRIFT/TAG EVENT SUMMARY ** WELL SHUT IN UPON ARRIVAL *** DRIFTED W/2.25 CENT, SAMPLE BAILER TO 11150' SLM. (POST CT FISH OP). SAMPLE BAILER CAME BACK EMPTY. ** LEFT WELL SHUT IN** T/I/O = 2300/0/0. INJECTIVITY RATE TEST. (PRE E-LINE). TBG DISPLACEMENT TO BOTTOM PERFS = 178 BBLS. PUMPED 35 BBLS OF CRUDE DOWN TBG AND SWITCHED TO 1% KCL. PUMPED 180 BBLS OF KCL AND STARTED INJECTIVITY TEST. INJECTION RATE ARE AS FOLLOWS. 1000 psi @ 1.65 BPM 1500 psi @ 2.66 BPM 2000 psi @ 4.1 BPM. ATTEMPTED TO REACH 2500 PSI, COULD NOT GET RATE. PUMPED AWAY REMAINING KCL AND SWITCHED TO DIESEL FOR TUBING FREEZE PROTECT.' SD AND TUBING WENT ON A VAC. FINAL WHP's = VAC/0/0. T/I/O=1500/20/0 (FOR COIL)IA FL @ 84' (4.5 BBLS). SET HALLIBURTON 2 7/8" FAS DRILL BRIDGE PLUG AT 11090'. CORRELATED TO SWS PPROF 4/20/01. CCL TO MIDDLE OF ELEMENT WAS 12.8'. MAX OD OF TOOL BEFORE SETTING WAS 2.18" TOTAL LENGTH OF PLUG LEFT IN HOLE WAS 18.0". LINER LAP SQUEEZE - MIRU DS CTU #9-- KILLED .WELL WITH 250 BBLS 2% KCL. GOT INJECTIVITY AFTER WELL KILLED. 3.5 BPM @ 2400 PSI/2.0 BPM @ 2090 PSI/1.5 BPM @ 1640 PSI. RIH INJECTING @ 0.4 BPM (2% KCL) WITH 2" BDN, TAGGED RCP, LINER TOP AND BRIDGE PLUG. CORRECTED TO BRIDGE PLUG DEPTH (11090'). FLAGGED PIPE @ 11080'. PUMPED 20 BBLS ACID, BROKE DOWN LINER LAP. SQUEEZED LINER LAP AAS PER PROGRAM. PUMPED 26 BBLS LATEX CEMENT. ESTABLISHED 3000 PSI SQUEEZE PRESSURE. HELD FOR 45 MINUTES. EST 7+ BBLS BEHIND PIPE. CLEANED OUT TO COMPOSITE BRIDGE PLUG WHILE MAINTAINING 500 PSIG WHP. POOH @ 80%, DOUBLE PASS ALL JEWELRY, AND FREEZE PROTECT WELL WITH 50/50 METHANOL. <<< CEMENT SQUEEZE COMPLETED >>> Page 1 C-26A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 05/30/03 (CONTINUED) POST JOB NOTE: TESTS RUN ON THE HCL ACID, FOUND THAT IT HAD EMULSIFIED IN THE TRANSPORT PRIOR TO PUMPING, CAUSING THE UNUSALLY HIGH TREATMENT PRESSURES WHILE THE ACID WAS IN THE COIL. DS WILL MODIFY PROCEDURES FOR TESTING ACID IN THE FUTURE. 06/O2/O3 PT LINER LAP/MILL COMPOSITE BP; MIRU DS CTU #9. PERFORM WEEKLY BOP TEST - FAILED. ROAD TO SHOP, REPLACE BOP's. ROAD BACK TO LOCATION. RU. PERFORM WEEKLY BOP TEST - PASSED. MU AND RIH WITH 1-11/16" WEATHERFORD PDM WITH 2.25" 4-BLADE JUNK MILL. PT LINER LAP TO 1000 PSIG WHP. WHP DROPPED TO 970 PSIG IN 30 MINUTES. MILLED CEMENT STRINGERS FROM 11057' (INITIAL TAG) TO 110181' CTMD, ENCOUNTERED TOUGHER MILLING. PUH AND RBIH AND TAG @ 11033' CTM (POSSIBLY THE RCP). GOT BY, CONTINUED TOUGH MILLING @ 11082' CTM. 06~03/03 MILLED CEMENT FROM 11081' TO 11134' CTM. (11037' TO 11090' CORRECTED). MILLED COMPOSITE BP @ 11134' THEN MILLED AND PUSH BRIDGE PLUG TO BOTTOM. NEW PBTD AT 12984' CORRECTED. POOH CIRCULATING. DRY RUN THROUGH TOP OF LINER @ 11043'--- OK. COULD NOT DRY RUN THROUGH TOP OF RCP @ 10989'. CONTINUED POOH CIRCULATING. FREEZE PROTECT WELL TO 2500' WITH 50/50 METHANOL. MILLED SHOWED SLIGHT WEAR AROUND EDGE OF FACE. RD DS CTU #9. <<< JOB COMPLETE >>> 06/11/03 FOUND WELL SHUT IN ON ARRIVAL. SSV CLOSED. RIG UP. (POST SQZ - DRIL CIBP). RAN 2.27" CENTRALIZER & 1.75" SAMPLE BAILER TO 11300' SLM. **WORK THROUGH TIGHT SPOTS @ 11036', 11042' & 11061' SLM** SET 4-1/2" SLIP STOP CATCHER SUB @ 3305' SLM. FLUIDS PUMPED BBLS 10 NEAT METHANOL 211 50/50 METHANOL 35 DIESEL 135 CRUDE 94 FRESH WATER 285 1% KCL WATER 1119 1% EXTRA SLICK KCL WATER 528 2% KCL WATER 230 2% EXTRA SLICK KCL WATER 150 1.5# BIOZAN 26 LATEX CEMENT (15.8 PPG, THICKENING TIME - 5 HRS 30 MINS) 3053 TOTAL Page 2 TREE = 4" FMC WELLI-EAD = Mc EV OY C 26A SAFETY NOTES: WELL ANGLE > 70° @ 11708' & > 90° AcTUATOR = BAKER i @ 12077'. NOTE: MAY ENCOUNTER PROBLEMS KB. ELEV = 71.71 PASSlNGTHROUGH 'RCP' PKR@ 10989' BF. ELEV = 38.81 ..... ~'' I H KOP = 2200" M~' ~,ngie = 94 @ 12944, ~ 1983' 4-1/2-OTIS SSSVN, ID = 3.813" Datum MD= 11552' Datum TVD = 8800' SS .. .... .. t 2~' Ho-~,~,,~v~I .I 13-3/8,. CSG, 7~,,-80, ,D= 12.347"..H 2722' ~-~ GAS LIFT MA NDRELS ~'~ ST IVE) TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 2.340" @'10989' -- ~i 1 3195 3047 43 CAM SO RE 20 06/12/03 4-1/2" HES RCP LNR TOP PKR ! ! I 1°61°' H 4'l/Z'OTISXNP"D:3'813"I ~ ~o~s~' H 9-~,~,, x ~-1,~,, .~..~..... = ~.oo,, I I ,"BOTLNRHGRW/TIEBACKSLV Id 10699' I 0'5/8" LNR' 47#' L-80' '0732 bP" D = 8'681" H 10~9' ~ ~ 11043' H 3-3/4" BKR LNRDEPLOY SLV, ID= 3.00" I TOP OF WHPSTOCK PKR 1--~ 11294' 12989' RE[: LOG: SWS MEMORY GR/CNL ON 08/21/98 ANGLE AT TOPPEI~: 88 @ 12500' Note: Refer to Production DB for historical perf data _ SIZE S4PF NTERVAL OpnlSqz DATE I.s~...~ u...,~~ I-t ~4' I 1.69" 12500 -12620 O 08/22/98 1.69" 4 12660 -12720 O 08/22/98 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT 11/11/82 ORIGHAL COMPLETION 11/04/02 ?B/TP GLV C/O WB_L: C-26A 06/04/89 RWO 05/29/03 BJM/TLP SET FAS DRILL BRIDGE PLUG PERMIT NO: 1981450 08/21/98 C'rD SIDETRACK 06/03/03 SRB/TLP CORRECTIONS TO DRAWING APl NO: 50-029-20834-01 02/05/01 SlS-lsl CONVERTED TO CANVAS 06/12/03 JM/KAK GLV CIO SEC 19, T11N, R14E, 1645' SNL & 1032' WEL 03/09/01 SIS-LG i FINAL 08/29/01 CH/KAK CORRECTIONS BP Exploration (Alaska) PERFORATION SUMMA RY REF LOG: SWS MEMORY GR/CNL ON 08/21/98 ANGLE AT TOPPERF: 88 @ 12500' Note: Refer to Production DB for historical perf data SIZE SPF NTERVA L Opn/Sqz DATE 1.69" 4 12500 -12620 O 08/22/98 1.69" 4 12660 -12720 O 08/22/98 DATE REV BY COMMENTS DATE REV BY COMMENTS 11/11/82 ORIGHAL COMPLETION 11/04/02 ?B/TP GLV C/O 06/04/89 RWO 05/29/03 BJM/TLP SET FAS DRILL BRIDGE PLUG 08/21/98 CTD SIDETRACK 06/03/03 SRB/TLP CORRECTIONS TO DRAWING 02/05/01 SIS-Isl CONVERTEDTOCANVAS 06/12/03 JM/KAK GLV CIO 03/09/01 SIS-LG FINAL 08/29/01 CH/KAK CORRECTIONS STATE OF ALASKA ALASKA--<.)IL AND GAS CONSERVATION Ct:,~MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Production Profile 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM 'At top of productive interval 1724' SNL, 4081' WEL, Sec. 30, T11N, R14E, UPM At effective depth 4765' SNL, 4265' WEL, Sec. 30, T11N, R14E At total depth 459' SNL, 4327' WEL, Sec. 30, T11N, R14E 5. Type ~f well: Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 71.71' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number C-26A 9. Permit Number / Approval No. 98-145 10. APl Number 50-029-20834-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 13055 feet 8951' feet 12991' feet 8953' feet Length Structural Conductor 110' Surface 2689' Intermediate 10926 Production Liner 593' Sidetrack Liner 1942' Plugs (measured) Junk (measured) KOP (window) @ 11280' - 11292'. 7" abandoned from 8517' to 11915' Size Cemented MD 20"x 30" 72 c.f. 143' 13-3/4" 3939 c.f. 2722' 9-5/8" 1697 c.f. 10959 7" 360 c.f. 10699'-11292' 2-7/8" 95 c.f. 11044'-12986' TVD 143' 2722' 8427' 8219'-8707' 8497'-9025' Perforation depth: measured true vertical Open Peds 12500'-12620'; 12660'-12720' Open Peds 8937'-8946'; 8950'-8955' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 10653'. 4-1/2" tail pipe from 10653' to 11280' Packers and SSSV (type and measured depth) 9-5/8" Baker Packer (HB) @ 10653' 4-1/2" Otis SSSVLN @ 1983' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~_~~ ,~__4r~ Title F~.,~, Prepared By Name/Number: :orm 10-404 Rev. 06/15/88 Date Submit In Duplicate C-26A '--~ DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 04/20/2001 PPROF: PRODUCTION PROFILE SUMMARY 04/20/01 FOUND TOP OF LINER LEAKING AT 11041 FT. CHOKE: 43 DEG /GAS: 9.6 MMSCF/NO LIQ. NO PRODUCTION COMING FROM PERFORATIONS INSIDE LINER. RESTRICTION IN TUBING BETWEEN 10988-10998 FT (MOST LIKELY IT IS THE LINER TOP PKR?) SI WELL. *****JOB IS COMPLETE**** Fluids Pumped BBLS. 0 0 TOTAL Description NO FLUIDS PUMPED Well Compliance Report File on Left side of folder 198-145-0 MD 13055 TVD 08951 Microfilm Roll / PRUDHOE BAY UNIT C-26A 50- 029-20834-01 BP EXPLORATION (ALASK Completion Date: 8 Completed Status: 1-OIL Current: Roll 2 / Name Interval D 8802 Z>N~" SPERRY GR Sent Received T/C/I) OH 12/9/98 12/8/98 D 8834 L GAS ENTRY L MCNL L NGP-MD L NGP-TVD R EOW RPT R SRVY LSTNG 1-11 SPERRY GR ,.,J~ 10450-12790 ~I~' 10876-12988 ~iNAL 11295-13057 ..~, ~FINAL 8638-8951 ~--BFI~- i 1200.- 13055. B~'~i200.- 13055. T 8990 lt~' SCHLUM MCNL Daily Well Ops ~/,~.~-- Was the well cored? yes n~)___ OH 11/25/98 11/25/98 CH 5 12/1/98 12/3/98 CH 2 2/15/99 2/18/99 OH 12/2/98 12/2/98 OH 12/2/98 12/2/98 OH 9/25/98 9/25/98 OH 9/25/98 9/25/98 CH 2/15/99 2/18/99 Are Dry Ditch Samples Required? yes ~_~And Received-?~. ~~-~ Analysis Description Rece~-Sample Comments: Tuesday, August 01,2000 Page 1 of 1 2/15/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'I'N: Sherrie NO. 12327 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) LIS Well Job # Log Description Date Blueline Sepia Tape B-28 ~ '-/ 99055 CNTD 981208 1 1 1 B-28 '~ ~ ~:~ 99056 RST-SIGMA 981208 1 1 1 D-22A ~-~oi _{ 98574 MCNL .BORAX 980727 1 1 1 H- 19B -~-'~:l~S~'l 99064 MCNL 980706 1 1 1 N-17 ~:~ ~ :~--- 99053 RST-SIGMA 981112 1 1 1 Z-35 ~c{~ 99043 MCNL BORAX 981001 I 1 1 C-26A ~ ~ O 99065 MCNL 980820 1 1 1 ,, , , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 RECEIVED Date Delivered: 1999 Schlumberger GeoQuest 3940 Arctic BIvd Received 0 R! I Cl--I I~ G SEFI~JICE S ~1,1, LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs C-26A (REDO), December 9, 1998 AK-MW-80333 1 LDWG formatted Disc with verification listing. API#: 50-029-20834-01 PLEASE ACKNOWLEDGE RECEIPY BY SIGNING AND RETURNING THE ATYACHI~D COPIES OF THE TRANSM1TY~ LETTER TO THE ATYENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. AnchoE .~~s~ k~9,fi~l 8 DEC 08 !998 Date: Alaska 0ii & Gas Cons. ¢ommis~io~ 3nc. borage BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Si %.. Note' This Data replaces all previous Digital Data for well (C-26A). 5631 Silverado Way, Suite G AnchOrage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company C] F! I I--I-- I I~1 G SEI:I~JI C E S To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 t q MWD Formation Evaluation Logs C-26A, AK-MW-80333 December 2, 1998 C-26A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-20834-01 1 Blueline 1 Folded Sepia 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-20834-01 1 Blueline 1 Folded Sepia PLEASE ACKNOWLEDGE RECEIVF BY SIGNING AND RETURNING TIlE ATFACHED COPIES OF THE TRANSMITTAL LETYER TO THE A'ITENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchor~a~,~A[.. ~. ~ka 995&8~ DEC O~' .-3 Date: .glasl~a Oi~ o. "-~:~ .............. ~,missiort BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Sign~)~ 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company BP EXPLORATION Date: 12-01-98 Trans# 89935 BP/PBU CASED HOLE LOGS Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166. .Sw Name RecType Rec Date Company Code :Comments K-17A CH 18-Nov-98 PDS GAMMA\CCL FLAG COIL C-26A CH 18-Nov-98 PDS. JEWELRY LOG, OTHER SERVICES- GAS ENTRY AND FBHP G-26A CH 29-Nov-98 PDS GAMMA\CCL FLAG COIL, OTHER SERVICES- JEWELRY LOG G-26A CH 29-Nov-98 PDS JEWELRY LOG, OTHER SERVICES- FLAG COIL C-26A CH 18-Nov-98 PDS GAS ENTRY Please s~gn and return one copy of this transmittal. Thank-you, I h Petrotechnical Data Center CH LOGS Becky Clark MB9-3 AOGCC Exxon Phillips Lori Taylor Susan Nisbet Info. Management I blueline/1 RS I blueline I blueline RECEIVED DEC 0~-~ 1998 -. Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 n F! I Cl_l IM G SEFI~./I C E S WELL LOG TRANSMITFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs C-26A, AK-MW-80333 November 25, 1998 1 LDWG formatted Disc with verification listing. API#: 50-029-20834-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITrAL LEITER TO THE ATrENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 -. ' ..... ': .v ,: \ ~.-.:;: . .-..- BP Exploration (Alaska) Inc. Petro-teehnieal Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 * (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company STATE OF ALASKA ALASKA (' AND GAS CONSERVATION COMMIS? N WELL COMPL.-~i'ION OR RECOMPLETION REPORT A'~.,~ LOG CT Sidetrack well 1. Status of Well [] Oil [~ Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-145 3. Address 8. APl Number P.O. Box196612, Anchorage, Alaska 99519-6612 50-029-20834-01 Classification of Service Well 4. Location of well at surface 1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM i' At top of productive interval 1724' SNL, 4081' WEL, Sec. 30, T11 N, R14E, U PM At total depth 459' SNL, 4327' WEL, Sec 30, T11N, R14E 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number C-26A 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 71.71 AMSL I ADL 028310 12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 8/10/98 I 8/19/98 I 8/22/98 I N/A MSL 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Surveyt 20. Depth where SSSV set~21. 13055 8951 FT 12991 89532 FT I~Yes [~No l 1982 MD! 22. Type Electric or Other Logs Run GR/CNL, GR il 1. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 16. No. of Completions One Thickness of Permafrost 1900' (Approx.) 23. CASING SIZE WT. PER FT. GRADE SE'FI'IN( Top CASING~ LINER AND CEMENTING RECORD i DEPTH 1 HOLE BOTTOM 1 S~ZE CEMENTING RECORD 2 7/8" 6.16# Conductor Surface 143 13-3/8" 72# L-80 Surface 2722 9-5/8" 47# L-80 Surface 10959 7" 26# L-80 10699 11915 2-7/8" 6.16# L-80 11044 12986 I3-3/4" 17,.1/2" 12-1/4" 8-1/2" 3-3/4" AMOUNT PULLED 8 c.y. 3939 c.f. 697 c.f. 360 c.f. 95 c.f. 25. TUBING RECORD SiZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, L-80 11620 9 5/8" @ 10653 7"@ 11610 26. ACID FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 24. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) MD TVD 12500-12620 8937-8946 12660-12720 8950-8955 1-11/16", 4SPF 27. PRODUCTION TEST Date First Production Aug 25, 1998 Date of Test Hours Tested Flow Tubing Casing Pressure Press. I Method of Operation (Flowing, gas lift, etc.) Flowing IPRODUCTION lOlL-BBb GAS-MCF LOR TEST · ~ALCULATED · lOlL-DEL GAS-MCF ~24-HOUR RATE I WATER-BBL WATER-eEL 28. CORE DATA tCHOKE SIZE tGAs-OIL RATIO OIL GRAvITY-APl (CORR) Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or_water. Submit corfi'~,hJt~s. ~ ,~¢% i~ ; / S EP 25 1998 A/as~a Oil & Gas Cons. ~ · Commission Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 'r 30. ~ ..rmation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. TZ3 11378 8700 TZ2C 11526 8780 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I herebYsigned c~hat,~°~and correct to the best of my knowledge' TITeresa Mills Title Coiled Tubing Drilling TA Date Prepared By Name/Number: Theresa Mills 564-5894 ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM I: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: C-26A Accept: 8/9/98 Field: Prudhoe Bay Spud: 8/11/98 APl: 50-029-20834-01 Release: 8/22/98 Permit: 98-145 CTD Unit: Nordic #1 Date Day Depth 8/9/98 1 Accept Rig 20:00 hrs. 8-8-98. NU BOP. Test BOP, AOGCC waived witnessing test. Install new pack-off, install CT Conn. Load CT w/Seawater. 8/10/98 2 Installed RA tag in whipstock body. RIH with whipstock. Set down with whipstock on anchor. Latch and pull free with 22K over. POOH. M/U Navidrill motor and starting mill. RIH. Tag whipstock. Repair rig pumps. Flag CT and mill with starting mill from 11287.5- 11389.9, POOH. PU One Trip Milling Assembly, TIH. Mill on window 8/11/98 3 Mill window and drill formation to 11309 ft CTD. Window area is clean. POOH with BHA #3. Lay out milling BHA. M/U directional drilling BHA #4. RIH with Bit #1 on a 2.2 deg motor. Circulate well to FIoPro. Orient TF to high side. RIH thru window. Ream under gauge hole. POOH, change bit and orientor, TIH. Attempt to work thru window, hanging up at top of window when picking up. Work pipe and pump to get free. POOH for mill assembly 8/12/98 4 '1 '1395 LD drilling BHA. M/U milling BHA. RIH with string reamer and formation mill. Ream from 11,288' - 11,309' CTD. Three tight spots. Ream up and down until clean. POOH. M/U directional drilling BHA #7 (2.2 deg motor; M-09 bit). RIH. Tag at 11,312'. Start drilling - several stalls. Adjust TF to 30R. Drill steady 11,312' - 11,395'. 8/13/98 5 '1 '1530 Finish WOC. Check losses at 1.0 BPM in/0.7 BPM out. POOH. LD cementing BHA. MU drilling BHA. RIH with BHA #11 (M58X, 2.2 deg motor). Correct to flag. Check TF and orient to 18R to go thru window (2.6 in/2.0 out). RIH at min rate until set down at 11417'. Drill firm Magne-Plus cement at 1.0'/min from 11417-450' (several stalls at 11420'-zone of loss?)with final circ rate at 2.7 in/2.3 out. Attempt to get survey/TF and MWD didn't respond. POOH. Impeller locked with metal fines. Downtime starts at 1500 hrs. Circulate/condition mud. Repair gooseneck rollers. Rehead. RIH with BHA #12. Clean through window and open hole. Back on clock at 0230 hrs. Tag corrected TD at 11,454'. Drill to 11,530'; losses slowed from 1.0 BPM to 0.2 BPM, then increased again to 1.0 BPM after wiper trip to 10,400'. 8/14/98 6 '11450 Drill from 11395-410' and penetration rate slowed (Zone 3). POOH for bit. Tie-in in at 11228' and no correction, flag CT. Change bit. RIH with BHA #8 (tricone/2.2 deg motor). Tie-in to flag (-10'). RIH thru window at 32R with no problem. Drill Zone 3 to 11425' and began having mud loss. Drill to 11450' and had no returns. POOH for cementing BHA. RIH with BHA #9. Tag TD at 11,450'. Losses at 50%. Mix and pump 2 bbls water, 14.5 bbls Magne-Plus, 2 bbls water. With 1 bbl out nozzle, attempt to lay in. Stuck. Back to full returns. Work pipe. When mud turned the corner, started getting losses again. Pipe pulled free. PU to window. SI CT and bullhead pill down backside. Saw slight bump in pressure when pill hit. Est circulation long way. Losses still high. Call for more Magne-Plus. RIH. Tag at 11,420'; work to 11,424'. POOH to change disconnect. RIH. Park nozzle above window. Pump 14.5 bbls Magne-Plus pill. Bullhead 5 bbls into formation. WHP ramped 300 psi to 700 psi. Lay in remaining pill. Check losses. 1.0 BPM in; 0.7 BPM out. 8/15/98 7 1'1758 Drill build and turn section from 11530-603' losing 0.5 BPM. Short trip to window. Losses increased to 1.0 BPM after short trip, but healed to 0.5 BPM after drilling resumed. Drill from 11603-696'. Penetration rate slowed and losses increased to 1.0 BPM. POOH to pump LCM. LD drilling BHA. MU cementing BHA. RIH with BHA #13 (nozzle). RIH to TD, no problem. Safety mtg. PT DS @ 4000 psi. Pump 2 bbls FW, 15 bbls 13.2 ppg neat Magne Seal cement, 5 bbls (5#/bbl) aggregate Magne Seal and 2 FW. Displace with rig mud to nozzle while RIH to TD. Lay in pill with back pressure. POOH. Full returns. LD cementing BHA. MU drilling BHA #14 (2.2 deg motor; M-26 bit). RIH. Correct to flag. Dry tag at 11,216'. Wash down to whipstock and tag. Orient to 30R. Work through window. Wash Magne-Plus at 10 FPM to 11,405'. Drill to 11,432' at 80 FPH then broke through. Wash to bottom. Sticky, packing off. In shale. Full returns. Tag TD 11,705'. Drill to 11,758'. 8/16/98 8 12125 Drill build and turn from 11758-823' with full returns. Short trip to window. Tie-in at 11348', add 4.0'. Drill from 11823-888'. POOH for motor. Change bit, motor and MWD probe. RIH with BHA #15 (1.0 deg motor, DS49 bit). Tie-in at previous flag. Precautionary ream to TD. Drill from 11888' - 12010'. Wiper trip to window. Drill to 12042'. Orient to turn left. Stuck off bottom 12,003'. Spot crude. Pull free. Drill 12042'- 12125'. 8/17/98 9 12428 Drill horizontal in Zone 2 from 12125-195'. Backream to window. Tie-in, add t9'. Drill from corrected 12214' to 12291' making slow hole while in sand. Change mud to new FIo Pro and had high pump pressure. POOH to inspect motor. LD drilling BHA. Found tandem motor coupler broke. Perform weekly BOP test. MU BHA #16 (1.0 deg motor; DS49 bit). RIH. Tie- in. Drill 12,292' - 12,428'. MWD survey data bad. POOH. Stop at 11800' and collect multirate data for MI. 8/18/98 10 12669 Finish POOH for MWD failure (started downtime at 0530 hfs). Change bit, MWD. RIH with BHA #17. Tie-in. Precautionary ream to TD-hole okay. End downtime at 1300 hrs. Drill horizontal with slow drop to planned second target from 12431-561' (8940' TVD-no sand). Geo needs 8955' TVD now. Backream to window. Tie-in. RIH. Drill 12561' - 12669'. Lost MWD signal and about 150 psi CTP. POOH. LD BHA. PWD tool leaking. MU BHA #18 (same motor; DSlll bit). RIH. 8/19/98 11 13057 Finish RIH with BHA #18. Tie-in. Precautionary ream to TD. Sat down at 11716', work thru OK. Drill from 12669' to 12838'. Short trip to window, 10K overpull at 11710'. Tie-in, add 6.0'. RIH, work thru 11700', OK. Found HOT at 12750' MD (8956' TVD). Drill from 12838-900' attempting build, but lost angle. Point TF straight up at 12900' to build to 8950' TVD. Drill to 12943'. Had stacking problems and losing 0.2 BPM. Backream to window-no overpulls. Tie- in, add 6.0'. RIH to TD. Drill from 12948-13055'. Backream to window, no overpulls. Tie-in, add 4ft. Ream down to TD at 13057'. Ream back to window. POOH. LD tools. 8/20/98 12 t 3057 LD drilling BHA. MU 62 jts 2-7/8" 6.16# L-80 STL liner. RIH on 2-3/8" CT to TD. Attempt to reciprocate and lost 4'. Park shoe at 13053' and displace mud with 2% KCI water (losing 0.2 BPM). Drop ball and release from liner. DS mix and pump 2 FW followed by 17 bbls Class G latex cement. Drop wiper dart and chase with 2% KCI water. Latched plug at calc displacement. Bumped plug to 2500 psi at calc displacement (lost 0.3 BPM avg with cement in annulus). Check floats, ok. Unsting from liner. Jet TOL at 11040' three times. POOH jetting. Saw cement in returns from liner top. LD liner running tools. MU 2.25" jet nozzle on 1.25 CSH. RIH and jet over liner top and down through liner. UCA reading 1480psi when nozzle entered liner. Jet wash down and tag latch collar at 13007'. (should read 12986'. Assumed counter error- plan to check with Memory CNL) PU 100ft, RIH and repeat tag same place. Liner is clean. POOH jetting liner. Saw cement in returns for brief period at bottoms up from liner top wash. RB injector and rack 1.25 CSH. 8/21/98 '13 Finish standback CSH workstring. MU SWS Memory GR/CNL. RIH with tool on CSH doubles. RIH with 2-3/8" CT. Begin logging down pass at 10900' at 30'/min to PBD. Perform repeat pass to 12700'. POOH logging at 30'/min from PBD to 10900'. Lay fresh FIo Pro mud for perforating in liner. POOH for perf guns. Standback CSH doubles. Download Memory CNL data and fax log to town. G©C appears to be at 11580' MD (8813' TVD). Underrun seen at 11781' MD (8882' TVD). Standby on perf depths. PT liner lap to 1800 psi. Good test. MU guns. 8/22/98 14 MU 234' of SWS perf guns. RIH on 28 stds of CSH workstring. RIH on 2-3/8" CT to PBD. Correct -10' to ELMD. PUH and park at set depth of 12721'. Drop 5/8" ball and pump to seat. Ball sheared at 3850 psi, lost 1.5 bbls. POOH with CT. Standback CSH. LD perf guns-all shots fired. RIH with nozzle to 2000' and FP with 33 bbls MeOH. POOH. Note: Perforated 12500-620' and 12660-720' with SWS 1-11/16 "guns at 4SPF Standback injector. ND BOPE. Flange up and install swab cap. PT to 3500psi. Release rig. Time on well: 14days, 3 hours. C 26 W EAD: McEVOY i KB. ELEV = 71.71' AC-~-oATOR: BAKER -. BF. ELEV = 38.81' SSSV LANDING NIPPLE O ( OTIS )(3.813" ID) FOC--E 13-3/8", 72#/ft, I I ~ ~ GAS LIFT MANDRELS b-8O, BTRS.. 7'22', ~ (OTIS w/RA LATCH) N° MD(BKB) TVDss I~ I 3195' KOP: 1500' MAX ANGLE: 53° @ 7000' 4-1/2", 12.6#/ft, L-80, BTRS TUBING TUBING ID: 3.958" CAPACITY: .01522 BBL/FT TDg/CT Cap.: 0.0097 bbl/ft ! ! 4 1/2 .... X" NIPPLE (OTIS ) (3.813" ID) -- 9 5~8" BAKER PACKER I 10,653'1 (HB ) (4.000"lB) TOPOF I I 7" LINER 10,699' ~ 4 1/2", 12.6#/ft, L-80 TAILPIPE L-80, BTRS I I~ k. 7", 26#/ft, L-80, IJ4S @ 11915' Top of 2.7/8" Liner at 11,043' 0.0058 bbl/ff, Min ID 2.377" ----------"" I ~ Whipstock Top @ 11283' ELMD ! RA Tag @ 11291' PERFORATION SUMMARY I,,~ Whipstock Tray 0 deg. High Side REF LOG: SWS - Mem GR/CNL 8/21/98 Size SPF Interval Stat POST-SDTRK~ ABANDONDED WELL 1.11/16" 4 12500-12620 open 1.11/16" 4 12660- 12720 Open 2.7/8" HORIZONTAL LINER PRE-SDTRK 2.1/8" 8 11474- 11514 P&A 2.1/8" 4 11570 - 11598 P&A 3.3/8" 6 11590 - 11600 P&A 3.3/8" 4 11616- 11620 P&A 3.3/8" 8 11620 - 11628 P&A . 3.3/8" 4 11634 - 11640 P&A 2.1/8" 4 11640- 11644 P&A 3.3/8" 4 11644 - 11672 P&A PBTD 1 2,9e ' I 2.7/8", 6.16#/,, L-8O. STL 113,056' I' DATE REV. BY COMMENTS PRUDHOE BAY UNIT 11-10-82 INITIAL COMPLETION WELL: C-26a (12-30-11-14) 6-4-89 RWO APl NO: 50-029-20834-01 8/21/98 PPA CT Sidetrack SEC 19; TN 11N; PGE 14E BP Exploration (Alaska) GAS LIFT MANDRELS (OTIS w/RA LATCH) N° MD(BKB) TVDss I 3195' 3047' 8400 8500 8600 8700 8800 8900 9000 9100 B.P. ExploraLion Structure : Pad C Field · Prudhoe Bay Well' C-26 Location · North Slope, Alaska <- West (feet) 3900 37s0 ~600 :4so ~`300 3,80 3000 28~0 2700 25~0 2400 I I I I I I I I I I I I I I I I I I I I n Po.sition GRID Creatcd by planner Dale plotted: 21-$cp-98 Plot Reference is C-26A. Coordinates ore in feet reference C-26. True Vertical D~pth'~ ore reference Mean ~o Level,/ --- Baker Hughes INTEO --- m "~...~ Kick off Point 4050 4200 4350 45OO 4650 4800 4950 5100 5550 5700 400 ,300 200 100 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Vertical Section (feet) -> Azimuth 351.67 with reference 5446.51 S, 2946.84 W from C-26 I I i I i i I I i i I i i I I I I I I i t I I I I I I i I I I I i I I i i I i I I i I i 5400 5250 B,P. Exploration Pad C C-26 C-26 Prudhoe Bay North Slope, Alaska ORIGINAL SURVEY LISTING by Baker Hughes INTEQ Your ref : C-26A Our ref : svy234 License : Date printed : 21-Sep-98 Date created : 21-Sep-98 Last revised : 21-Sep-98 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 665344.790,5961240.590,999.00000,N Slot location is n70 17 45.132,w148 40 8.713 Slot Grid coordinates are N 5959573.000, E 664355.000 Slot local coordinates are 1667.59 S 989.79 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is Grid North B.P. Exploration Pad C,C-26 Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : C-26A Last revised : 21-Sep-98 Measured Inclin Azimuth True Vert R E C T A N G U L A R Dogleg Vert G R I D £ 0 0 R D S Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing 11200.00 30.92 217.54 8556.58 5446.51S 2946.84W 2.21 0.00 661408.16 5954126.49 11280.00 30.92 217.21 8625.21 5479.17S 2971.79W 0.21 -28.71 661383.21 5954093.83 11309.10 33.66 220.83 8649.81 5491.23S 2981.59W 11.52 -39.22 66137-J.41 5954081.77 11341.10 40.34 224.83 8675.35 5505.31S 2994.71~ 22.18 -51.25 661360.29 5954067.69 11378.40 48.87 229.50 8701.89 5523.03S 3013.94W 24.49 -65.99 661341.06 5954049.97 11409.50 54.20 244.60 8721.30 5536.10S 3034.33W 41.63 -75.98 661320.67 5954036.90 11442.50 53.88 251.80 8740.69 5546.01S 3059.10W 17.68 -82.19 661295.90 5954026.99 11471.70 55.00 262.60 8757.71 5551.25S 3082.21W 30.32 -84.02 661272.79 5954021.75 11500.20 57.30 271.20 8773.60 5552.50S 3105.81~ 26.32 -81.85 661249.19 5954020.50 11531.90 59.60 282.30 8790.23 5549.30S 3132.56~ 30.69 -74.80 661222.44 5954023.70 11579.10 62.30 298.40 8813.26 5534.95S 3171.03W 30.33 -55.03 661183.97 5954038.05 11613.30 64.70 308.10 8828.55 5518.18S 3196.57W 26.33 -34.74 661158.43 5954054.82 11646.30 67.30 318.80 8842.00 5497.47S 3218.39W 30.64 -11.08 661136.61 5954075.53 11676.10 68.90 325.00 8853.12 5475.72S 3235.43W 20.03 12.91 661119.57 5954097.28 11707.60 71.90 329.00 8863.69 5450.83S 3251.58W 15.29 39.87 661103.42 5954122.17 11737.80 75.00 337.60 8872.31 5425.00S 3264.56~ 29.16 67.31 661090.44 5954148.00 11768.60 76.20 347.30 8879.99 5396.59S 3273.53~ 30.75 96.72 661081.47 5954176.41 11798.50 76.30 354.50 8887.10 5367.93S 3278.12W 23.39 125.74 661076.88 5954205.07 11833.10 77.40 2.80 8894.99 5334.28S 3278.91W 23.57 159.15 661076.09 5954238.72 11867.00 82.30 11.00 8900.97 5301.20S 3274.89W 27.85 191.30 661080.11 5954271.80 11901.10 85.50 16.80 8904.60 5268.30S 3266.74~ 19.34 222.67 661088.26 5954304.70 11936.40 86.30 20.00 8907.12 5234.90S 3255.63W 9.32 254.11 661099.37 5954338.10 11975.50 86.26 26.40 8909.66 5199.05S 3240.27W 16.33 287.35 661114.73 5954373.95 12010.70 87.90 28.80 8911.45 5167.90S 3223.98W 8.25 315.82 661131.02 5954405.10 12043.40 88.90 26.80 8912.37 5138.99S 3208.74W 6.84 342.21 661146.26 5954434.01 12076.60 90.90 26.70 8912.42 5109.34S 3193.80W 6.03 369.38 661161.20 5954463.66 12112.10 90.20 22.10 8912.08 5077.03S 3179.13W 13.11 399.24 661175.87 5954495.97 12141.40 87.80 17.50 8912.59 5049.47S 3169.21W 17.70 425.06 661185.79 5954523.53 12174.00 87.80 14.90 8913.85 5018.19S 3160.13W 7.97 454.70 661194.87 5954554.81 12203.30 88.00 14.20 8914.92 4989.85S 3152.77W 2.48 481.67 661202.23 5954583.15 12235.70 87.90 13.00 8916.08 4958.38S 3145.16~ 3.71 511.71 661209.84 5954614.62 12264.90 87.30 10.50 8917.30 4929.82S 3139.22W 8.80 539.11 661215.78 5954643.18 12303.00 85.80 2.90 8919.60 4892.08S 3134.78W 20.30 575.81 661220.22 5954680.92 12341.70 83.40 4.80 8923.24 4853.64S 3132.20W 7.90 613.46 661222.80 5954719.36 12369.60 81.10 5.00 8927.00 4826.10S 3129.83W 8.27 640.37 661225.17 5954746.90 12409.10 84.70 8.20 8931.88 4787.17S 3125.33W 12.15 678.24 661229.67 5954785.83 12443.30 87.30 12.10 8934.27 4753.60S 3119.31W 13.68 710.58 661235.69~ 5954819.40 12479.50 87.70 14.90 8935.85 4718.44S 3110.87W 7.81 744.15 661244.13 5954854.56 12519.10 87.60 13.50 8937.47 4680.08S 3101.17%/ 3.54 780.70 661253.83 5954892.92 12552.70 86.60 10.80 8939.17 4647.28S 3094.10W 8.56 812.13 661260.90 5954925.72 12583.20 83.40 9.20 8941.83 4617.36S 3088.83~ 11.72 840.97 661266.17 5954955.64 12614.90 82.90 6.10 8945.61 4586.17S 3084.64W 9.84 871.22 661270.36 5954986.83 12642.20 82.00 4.90 8949.20 4559.23S 3082.04W 5.46 897.50 661272.96 5955013.~ 12680.50 86.10 3.60 8953.17 4521.25S 3079.22W 11.22 934.67 661275.78 5955051.75 12710.00 87.80 2.40 8954.74 4491.84S 3077.68W 7.05 963.55 661277.32 5955081.16 12753.70 88.10 358.00 8956.30 4448.18S 3077.53~ 10.09 1006.73 661277.47 5955124.82 12778.70 89.12 353.10 8956.91 4423.27S 3079.4714 20.01 1031.66 661275.53 5955149.73 12802.90 87.80 351.20 8957.56 4399.30S 3082.7714 9.56 1055.85 661272.23 5955173.70 12840.80 87.50 347.60 8959.12 4362.09S 3089.74~ 9.52 1093.68 661265.26 5955210.91 12872.60 91.02 348.90 8959.53 4330.96S 3096.21W 11.80 1125.41 661258.79 5955242.04 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from C-26 and TVD from Mean Sea Level. Bottom hole distance is 5213.49 on azimuth 217.13 degrees from wellhead. Vertical section is from tie at S 5446.51 W 2946.84 on azimuth 351.67 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ B.P. Exploration Pad C,C-26 Prudhoe Bay,North Slope, Alaska Measured Inclin Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S SURVEY LISTING Page 2 Your ref : C-26A Last revised : 21-Sep-98 Dogleg Vert G R I D C 0 0 R D S Deg/lOOft Sect Easting Northing 12904.10 92.90 346.20 8958.45 4300.23S 3103.00W 10.44 1156.81 661252.00 5955272.7-/ 12943.80 94.30 344.10 8955.96 4261.93S 3113.15W 6.35 1196.17 661241.85 5955311.07 12975.90 94.20 343.40 8953.58 4231.20S 3122.11g 2.20 1227.88 661232.89 5955341.80 13011.20 91.90 340.60 8951.70 4197.68S 3133.00~ 10.26 1262.62 661222.00 5955375.32 13032.00 91.00 341.00 8951.17 4178.04S 3139.84~ 4.73 1283.04 661215.16 5955394.96 13055.00 91.00 341.00 8950.77 4156.30S 3147.32~ 0.00 1305.64 661207.68 5955416.70 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from C-26 and TVD from Mean Sea Level. Bottom hole distance is 5213.49 on azimuth 217.13 degrees from wellhead. Vertical section is from tie at S 5446.51 W 2946.84 on azimuth 351.67 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ BP Exploration, Inc. Well: C-26A Prudhoe Bay North Slope, Alaska Rig: Nordic #1/CTU #7 End of Well Survey Report Provided in: True - Grid - ASP BHI Rep: Howard Wagoner Job Number: 99490 AFE Number: 4P1163 Reviewed by: BAKER HUGHES iNTEQ EOW Survey Calculations Coordinates provided in: TRUE and GRID relative to Wellhead and ALASKA STATE PLAN Company: BP Exploration Rig: Nordic #1/CTU #7 Job No: 99490 Well: C-26A Field: Prudhoe Bay, Alaska AFE No: 4Pl163 Calculation Method: Minimum Curvature Mag. Declination: 27.930 BHI Rep: Howard Wagoner Vertical Sect. Plane: 352.930 TRUE Grid Correction: 1.260 Job Start Date: 10-Auld-98 Vertical Sect. Plane: 351.670 GRID Total Correction: 26.670 Job End Date: 22-Au~-98 Measured Depth from: RKB RKB Height: 71.700 DLS (°/100ft): 100.00 True Vertical Depth: Sea level Meas. Incl. TRUE Subsea Vertical DLS Coords. - TRUE GRID Coords. - GRID Coords. - ASP Depth Angle Azi. TVD Section N(+)/S(-) E(+)fW(-) Azi. N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) (deg) (deg) (ft) (TIP) °/100ft. Lat. (Y) Dep. (X) (deg) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) I 1200.00 30.92 216.28: 8556.58 0.00 0.00 -5380.02 -3066.54 217.54 -5446.15 -2947.50 5954126.85 66 ! 407.50 11280.00 30.92 215.95 8625.21 -28.70 0.20 -5413.23 -3090.77 217.21 -5478.82 -2972.45 5954094. i 8 661382.55 I 1309. l 0 33.66 219.57 8649.81 -39.20 11.50 -5425.50 -3100.30 220.83 -5490.88 -2982.25 5954082.12 661372.75 I 1341.10 40.34 223.57 8675.36 -51.20 22.20 -5439.86 -3113.10 224.83 -5504.95 -2995.37 595406§.05 661359.63 11378.40 48.87 228.24 8701.90 -66.00 24.40 -5458.00 -3131.94 229.50 -5522.67 -3014.60 5954050.33 661340.40 11409.50 54.20 243.34 8721.30 -76.00 41.70 -5471.52 -3152.04 244.60 -5535.75 -3034.99 5954037.25 661320.01 I 1442.50' 53.88 250.54 8740.70 -82.20 17.70 -5481.97 -3176.58 251.80 -5545.66 -3059.76 5954027.34 661295.24 11471.70 55.00 261.34 8757.71 -84.00 30.30 -5487.71 -3199.57 262.60 -5550.89 -3082.87 5954022.11 66 i 272. ! 3 1 ! 500.20 57.30 269.94 8773.61 -81.90 26.30 -5489.49 -3223.14 271.20 -5552.15 -3106.47 5954020.85 661248.53 11531.90 59.60 281.04 8790.23 -74.80 30.70 -5486.87 -3249.96 282.30 -5548.95 -3133.22 5954024.05 661221.78, 11579.10 62.30 297.14 8813.26 -55.10 30.40 -5473.37 -3288.73 298.40 -5534.60 -3171.69 5954038.40 661183.31 11613.30 64.70 306.84 8828.55 -34.70 26.30 -5457.17 -3314.63 308.10 -5517.82 -3197.23 5954055.18 661157.77 11646.30 67.30 317.54 8842.00 -11.10 30.60 -5436.94 -3336.90 318.80 -5497.11 -3219.05 5954075.89 661135.95 11676.10 68.90 323.74 8853.13 12.90 20.10 -5415.57 -3354.42 325.00 -5475.36 -3236.09 5954097.64 661 i 18.91 1 i 707.60 71.90 327.74 8863.70 39.90 15.30 -5391.05 -337 I. 11 329.00 -5450.48 -3252.24 5954122.52 66 i I 11737.80 75.00 336.34 8872.31 67.30 29.20 -5365.50 -3384.65 337.60 -5424.64 -3265.22 5954148.36 66 ! {}89.7 ~, 11768.60 76.20 346.04: 8879.99 96.70 30.70 -5337.30 -3394.25 347.30 -5396.23 -3274.19 5954176.77 661080.81 11798.50 76.30 353.24 8887.11 125.70 23.40 -5308.75 -3399.47 354.50 -5367.57 -3278.78 5954205.43 661 (}76.22 11833.10 77.40 1.54 8894.99 159.10 23.60 -5275. i 2 -3401.00 2.80 -5333.92 -3279.57 5954239.08 661 {)75.43 l 1867.00 82.30 9.74 8900.97 191.30 27.80 -524 ! .96 -3397.71 l 1.00 -5300.84 -3275.55 5954272. I (-~ 661079.45 11901.10 85.50 15.54 8904.60 222.60 19.40 -5208.89 -3390.28 16.80 -5267.94 -3267.40 5954305.06 661087.60 1 ! 936.40 86.30 18.74 8907.12 254.10 9.30 -5175.25 -3379.91 20.00 -5234.54 -3256.29 5954338.46 661098.71 1 i 975.50 86.26 25.14 8909.66 287.40 16.30 -5 i 39.08 -3365.34 26.40 -5198.70 -3240.93 5954374.30 66 i i 14.07 12010.70 87.90 27.54 8911.46 315.80 8.30 -5107.58 -3349.74 28.80 -5167.55 -3224.64 5954405.45 661130.36 12043.40 88.90 25.54 8912.37 342.20 6.80 -5078.34 -3335.14 26.80 -5138.63 -3209.40 5954434.37 661145.60 12076.60 90.90 25.44 8912.43 369.30 6.00 -5048.37 -3320.85 26.70 -5108.99 -3194.46 5954464.01 66116(}.54 12112.10 90.20 20.84 8912.09 399.20 13.10 -5015.74 -3306.90 22.10 -5076.67 -3179.80 5954496.33 661175.2{} 12141.40 87.80 16.24 8912.60 425.00 17.70. -4987.97 -3297.59 17.50 -5049.11 -3169.88 5954523.89 661185.12 Meas. Incl. TRUE Subsea Vertical DLS Coords. - TRUE GRID Coords. - GRID Coords. - ASP Depth Angle Azi. TVD Section N(+VS(-) E(+)/W(-) Azi. N(+VS(-) E(+)/W(-) N(+VS(-) E(+)/W(-) . (de~) (de~) (R) (TIP) °/100fL Lat. (Y) Dep. (X) (de~) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) 12174.00 87.80 13.64 8913.85 454.60 8.00 -4956.50 -3289.19 14.90 -5017.84 -3160.79 5954555.16 661194.21 12203.30 88.00 12.94 8914.92 481.60 2.50 -4928.00 -3282.46 14.20 -4989.49 -3153.43 5954583.51 661201.57 12235.70 87.90 11.74 8916.08 511.70 3.70 -4896.37 -3275.54 13.00 -4958.02 -3145.82 5954614.98 661209.18 12264.90 87.30 9.24 8917.31 539.10 8.80 -4867.69 -3270.23 10.50 -4929.46 -3139.88 5954643.54 661215.12 12303.00 85.80 1.64' 8919.60 575.80 20.30 -4829.86 -3266.63 2.90 -4891.72 -3135.~ 5954681.28 661219.56 12341.70 83.40 3.54 8923.24 613.50 7.90 -4791.37 -3264.89 4.80 -4853.28 -3132.86 5954719.72 661222.14 12369.60 81.10 3.74 8927.01 640.30 8.30 -4763.79 -3263.13 5.00 -4825.74 -3130.50 5954747.26 661224.50 12409.10 84.70 6.94 8931.89 678.20 12.10 -4724.77 -3259.48 8.20 -4786.82 -3125.99 5954786.18 661229.{)1 12~3.30 87.30 10.84 8934.27 710.50 13.70 -4691.07 -3254.21 12.10 -4753.24 -3119.97 5954819.76 661235.03 12479.50! 87.70 13.64 8935.85 7~.10 7.80 -4655.73 -3246.54 14.90 -4718.08 -3111.53 5954854.92 661243.47 12519.10 87.60 12.24 8937.48 780.70 3.50 -4617.17 -3237.68 13.50 -4679.72 -3101.83 5954893.28 661253.17 12552.70 86.60 9.54 8939.18 812.10 8.60 -4584.22 -3231.34 10.80 -4646.92 -3094.76 5954926.08 661260.24 12583.20 83.40 7.94 8941.84 840.90 11.70! -4554.20 -3226.73 9.20 -4617.00 -3089.49 5954956.00 661265/~' 12614.90 82.90 4.84 8945.62 871.20 9.80 -4522.92 -3223.22 6.10 -4585.82 -3085.30 5954987.18 661269.¥~, 12642.20 82.00 3.64 8949.21 897.50 5.50 -4495.94 -3221.22 4.90 -4558.88 -3082.70 5955014.12 661272.30 12680.50 86.10 2.34 8953.17 934.60 11.20 -4457.90 -3219.24 3.60 -4520.90 -3079.88 5955052.10 661275.12 12710.00 87.80 1.14 8954.74 963.50 7.00 -4428.46 -3218.34 2.40 -~91.48 -3078.34 5955081.52 661276.66 12753.70 88.10 356.74 8956.31 1006.70 10.10 -4384.81 -3219.15 358.00 -4447.82 -3078.19 5955125.18 661276.81 12778.70 89.12 351.84 8956.92 1031.60 20.10 -4359.94 -3221.64 353.10 -4422.91 -3080.13 5955150.09 661274.87 12802.90 87.80 349.94 8957.57 1055.80 9.50 -4336.06 -3225.47 351.20 -4398.95 -3083.43 5955174.05 661271.57 12840.80 87.50 346.34 8959.12 1093.60 9.50 -4299.01 -3233.25 347.60 -4361.73 -3090.40 5955211.27 661264.60 12872.60 91.02 347.64 8959.53 1125.40 11.80 -4268.03 -3240.41 348.90 -4330.61 -3096.87 5955242.39 661258.13 12904.10 92.90! 344.94 8958.45~ 1156.80 10.40 -4237.45 -3247.87 346.20 -4299.87 -3103.66 5955273.13 661251.34 12943.80 94.30 342.84 8955.96 1196.20 6.30 -4199.39 -3258.86 344.10 -4261.57 -3113.81 5955311.43 661241.19 12975.90 94.20 342.14 8953.58 1227.90 2.20 -4168.86 -3268.49 343.40 -4230.84 -3122.77 5955342.16 661232.23 13011.20 91.90 339.34 8951.70 1262.60 10.30 -4135.59 -3280.12 340.60 -4197.32 -3133.66 5955375.68 661221.34 13032.00 91.00 339.74. 8951.18 1283.10 4.70 -4116.11 -3287.38 341.00 -4177.69 -3140.50 5955395.31 661214.50 13055.00 91.00 339.74 8950.78 1305.60 0.00 -4094.53 -3295.35 341.00 -4155.94 -3147.98 5955417.06 661207.02 TONY KNOWLE$, GOVERNOR 5LASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August 6, 1998 Tcdd Stagg Coiled Tubing Engincering BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoc Bay Unit C-26A BP Exploration (Alaska) Inc. Permit No. 98-145 Sur. Loc. 1645'SNL. 1032'WEL. Sec. 19. T1 IN, RI4E. UM Btmnhole Loc. 584'SNL. 4278'WEL. Sec. 30. T11N. R14E. UM Dear Mr. Stagg: Enclosed is thc approvcd application for permit to rcdrill thc above rcfcrcnccd well. Thc permit to rcdrill does not exempt you from obtaining additional permits required by law from other govcrnmental agcncics? and does not authorizc conducting drilling opcrations until all other rcquircd permitting determinations arc made. Blowout prevention cquipmcnt (BOPE) must bc tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a rbprcscntativc of the Commission to xvitncss a tcst of BOPE installed prior to drilling ncxv holc. Notice max' be given bx'. contacting thc Commission pctrolcum field inspcctor on thc North Slopc pagcr at 659-3607. David W. Johns~w- Chairman -. BY ORDER OF THE COMMISSION dlffEnclosurcs CC: Dcpartmcnt of Fish & Game. Habitat Scction w/o cncl. Dcpartmcnt of Environmcntal Conscrvation w/o cncl. STATE OF ALASKA ALASKA ( . AND GAS CONSERVATION CO: . PERMIT TO DRILL 2O AAC 25.OO5 fISSION CT Sidetrack well [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry I-1Deepenl E~ Service E~] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 71.71 AMSL Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box196612, Anchorage, Alaska 99519-6612 ADL 028310 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1645' SNL, 1032' WEL, Sec. 19, T11 N, R14E, UPM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 1724' SNL, 4081' WEL, Sec. 30, T11 N, R14E, UPM C-26A Attotal depth 9. Approximate spud date Amount $200,000.00 584' SNL, 4278' WEL, Sec. 30, T11N, R14E, UPM 8/7/98 ........ 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028305 @ 584'I No Close Approach 2560 12,788 8960'TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 11,270 Maximum Hole Anqle 90° Maximum surface 3350 psig, At total depth (TVD) @8800' 3633 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2 7/8" 6.16# L-80 ST-L 1688 11,100 8472 12,788 8960 112 c.f. 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summaryRECEIVED Total depth: measured 11915 feet Plugs (measured) true vertical BED 9257 feet JUL 2 81,998 Effective depth: measured 11837 feet Junk (measured) true vertical 9238 feet A~a$~3, Oil & Gas Cons, 6ommissiort Casing Length Size Cemented Anchorage MD TVD Structural Conductor 110 20x30 8 c.y. 143 143 Surface 2689 13-3/8" 3939 c.f. 2722 2678 Intermediate 10926 9-5/8" 1697 c.f. 10959 8426 Production Liner 1216 7" 360 c.f. 10699-11915 8218-9257 Perforation depth: measured 11621'-11628', 11644'-11672'ORIGINAL true vertical (subsea) 8995'-9040' (two intervals) 20. Attachments [] Filing Fee [] Drilling Fluid Program [] Property Plat [] Time vs Depth Pict [] BOP Sketch [] Refraction Analysis [] Diverter Sketch [] Seabed Rep Contact Engineer Name/Number: Ted Stagg 564-4694 Prepared By Name/Number: Theresa Mills 564-5894 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Ted SIaqq % _ . . Title Coiled Tubing Drilling Engineer Date /'"/ Commission Use Only Permit Number I APl Number t A,A,A,A,~proval Date ISee cover letter ~C:'-...//~,/,_~' 50- ~..2, ~- -~. O ~..~ ~ --~ / 4~:¢-., ? ,- ~ for other requirements Conditions of Approval: Samples Required [] Yes .,~ No Mud Log Required [] Yes~'~3 ' No Hydrogen Sulfide Measures I--lYes ?~ No Directional Survey Required ,~ Yes [] No Required Working Pressure for BOPE [] 2M; [] 3M; [] 5M; [] 10M; [] 15M I~1 Other: by order of iApproved By Original $~gne(]. I~ Commissioner the commission Date ~:~-., Submit In Triplicate Form 10-401 Rev. 12-01-85 David W. Johnston BPX C-26A Sidetrack Summary of Operations: C-26 is currently shut-in since 9/96 due to high water cut. The sidetrack, C-26A, will target Zone 2 (25P-22P) reserves. This sidetrack will be conducted in two phases. Phase 1: Lay abandonment cement and set whipstock: Planned for 8/'1/98. · C-26 has passed a tubing integrity test. The well has been drifted and a Kinley caliper has been run. · Existing perforations will be abandoned with approx. 20 bbls cement. Abandonment cement will be downsqueezed through the annulus of the 4 %" x 7" straddle in order to stabilize the 4 %" tubing for milling and to abandon existing perforations. Abandonment cement will be pressure tested to 1500 psi with AOGCC witness. This procedure is described in more detail in the Form 10-403. · A permanent whipstock will be set on ELine at approximately 11,270' MD. Phase 2: Mill Window and Drill Directional Hole: Planned for 8~7~98. Directional drilling coil tubing equipment will be rigged up and utilized to mill the window and drill the directional hole as per attached plan. Mud Program: -Phase 1: Seawater - Phase 2: FIo-Pro (8.8 - 8.9 ppg) Casing Program: - 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 11,100' MD and cemented with approx. 20 bbls. cement. The well will then be perforated with coil tubing conveyed guns. Well Control: - BOP diagram is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachments. - Kick Off: 11,270' MD (8,617' TVD ss) - TD: 12,788' MD (8,960' TVD ss) - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · A Gamma Ray log will be run over all of the open hole section. · Memory CNL will be run in the 2 7/8" liner. TREE: WELLHEAD: 4" FMC McEVOY BAKER C-[ Proposed 13-3/8", 72#/ft, L-80, BTRS. ~722' I ~ FOC KOP: 1500' MAX ANGLE: 53° @ 7000' 4-1/2", 12.6#/ft, L-80, BTRS TUBING TUBING ID: 3.958" CAPACITY: .01522 BBL/FT Complet KB. ELEV = 71.71' BF. ELEV = 38.81' ;V LANDING NIPPLE ( OTIS )(3.813" ID) 1983' GAS LIFT MANDRELS (OTIS w/RA LATCH) No MD(BKB) TVDss 1 3195' 3047' PERFORATION SUMMARY REF LOG: SWS- BHCS- 11-02-2 INTERVAL 11,474 -11,514' 11,570 -11,598' .SQZD/ SQZD/ 11,590 -11,600' Open/4-28-93 11,616 - 11,620 11,620 -11,628' 11,634 - 11,640 11,640 -11,644' 11,644 -11,672' OPEN/4-12-93 OPEN/4-12-93 OPEN/4-12-93 SQZD/6-4-89 OPEN/6-30-89 Squeeze holes approx. 11 Whipstock approx. 11,270' Bridge Plug approx. 11,460' 7" BAKER PACKER (SAB w/"K" ANCHOR (4.000" ID) 4 1/2 .... XN" NIPPLE (OTIS) (3.725" ID) 4 1/2" TBG TAIL (WLEG) 111,618' 111,626' 111,629' (ELMD) I 11,620' NOTE: PERFS From 11,590-11,600' and 11,616-11,620 FT BKB WERE SHOT THRU THE 4.5" TAILPIPE FISH: FINGER OFF OF TEL LOST 8-17-90 (4"L x 1 1/2"W x 3/8" T) FISH' 1 1/2" OD DGLV DROPPED 6-22-89 -11,830' WLM OR DEEPER. PBTD 7", 26#/ff, L-80, IJ4SI [ 1 1 .~---"~71~ 4 1/2 .... X" NIPPLE (OTIS) (3.813" ID) 110,610' BAKER PBR SEAL ASSY.I 10,631' 9 5/8" BAKER PACKER I 1 0,653'I (HB) (4.000"ID) 4 1/2", 12.6#/ft, L-80 TAILPIPE Top 7" liner 10,699 9-5/8", 47#/ft, L-80, BTRS 110,959'I 2 718" Cemented Liner Window milled through 4 112" and 7" strings. ...t C-26 Vertical Section 835o 84OO 8450 850O 8550 86OO 8650 8700 875O 8800 8850 8900 8950 9OO0 8,940 8,960 5OO Path Distance (Feet) 1,000 1,500 TSGR 8404ss, 11,018 MD 2,000 Angle @ K.O.= 31 deg MD:11270 Tot Drld:1518 ft 12788 TD 2,500 Marker Depths ~Orig Wellbore TSAD I 8,509 Ift 'I-VD TZ3 I 8,7001ft TVD TZ2C I 8,7801ft -I-VD 8,9401 8,9401ft -I-VD Kick Off I 8,617 ft -I-VD I 11,270 ft MD Deprtr @KO 6,243 ft IMD KO Pt 11,270I MD New Hole 1518I I Total MD _ 12,788I TVD TD 8,---~'~I DLS deg/100 Tool Face Length Curve 1 0 0 20 Curve 2 24 75 79 Curve 3 24 80 146 Curve 4 24 55 334 Curve 5 8 -90 299 Curve 6 8 180 122 Curve 7 8 0 119 Curve 8 6 90 399 1,518 Drawn: 7/28/98 9:09 Plan Name: Case 401 -3,500 0 o .J ._~ C-26 I -3,500 -3,000 -2 -4,000 -4,500 -5,000 X distance from Sfc Loc -6,000 Well Name C-26 I CLOSURE Distance 5,315 ft Az 216 deg NEW HOLE E/W (X) N/S (Y) Kick Off -2,969 -5,475 TD -3,138 -4,290 State Plane 661,217 5,955,283 Surface Loc 664,355 5,959,573 DLS deg/100 Tool Face Length Curve 1 0 0 20 Curve 2 24 75 79 Curve 3 24 80 146' Curve 4 24 55 334 Curve 5 8 -90 299 Curve 6 8 180 122 Curve 7 8 0 119 Curve 8 6 90 399 1,518 Drawn: 7/28/98 9:09 Plan Name: Case 401 C~26A CT Drilling & Completion BOP LM 22.5" 18"I 38" 2 3/8" CT -~ 110,000 psil Pack-OffI 7 1/t6" Annular J Blind/Shear Pipe/Slip ~ 2 3/8" __---- -- 1/16" X 5000 psi ~'~ Sl~ps ~ ~ ~ 7/8" 7 ~/~6" Pipe I ~ 2 3/8" SWAB OR MASTER VALVE BPX C-26A Sidetrack Summary of Operations: C-26 is currently shut-in since 9~96 due to high water cut. The sidetrack, C-26A, will target Zone 2 (25P-22P) reserves. This sidetrack will be conducted in two phases. Phase 1' Lay abandonment cement and set whipstock: Planned for 8/1/98. · C-26 has passed a tubing integrity test. The well has been drifted and a Kinley caliper has been run. · Existing perforations will be abandoned with approx. 20 bbls cement. Abandonment cement will be downsqueezed through the annulus of the 4 ½" x 7" straddle in order to stabilize the 4 ~,,~" tubing for milling and to abandon existing perforations. Abandonment cement will be pressure tested to 1500 psi with AOGCC witness. This procedure is described in more detail in the Form 10-403. · A permanent whipstock will be set on ELine at approximately 11,270' MD. Phase 2' Mill Window and Drill Directional Hole' Planned for 8/7/98. Directional drilling coil tubing equipment will be rigged up and utilized to mill the window and drill the directional hole as per attached plan. Mud Program' - Phase 1' Seawater - Phase 2: FIo-Pro (8.8 - 8.9 ppg) Casing Program' - 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 11,100' MD and cemented with approx. 20 bbls. cement. The well will then be perforated with coil tubing conveyed guns. Well Control: - BOP diagram is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachments. - Kick Off: 11,270' MD (8,617' TVD ss) - TD: 12,788' MD (8,960' TVD ss) - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · A Gamma Ray Icg will be run over all of the open hole section. · Memory CNL will be run in the 2 7/8" liner. E: 4" FMC _HEAD: McEVOY ;TUATOR: BAKER Proposed 13-3/8", 72#/ft, ~722' I L-80, BTRS. FOC KOP: 1500' MAX ANGLE: 53° @ 7000' 4-1/2", 12.6#/ft, L-80, BTRS TUBING TUBING ID' 3.958" CAPACITY: .01522 BBL/FT Com plet'r- n KB. ELEV = 71.71' BF. ELEV = 38.81' ;V LANDING NIPPLE ( OTIS )(3.813" ID) 1983' GAS LIFT MANDRELS (OTIS w/RA LATCH) No MD(BKB) TVDss 1 3195' 3047' PERFORATION SUMMARY REF LOG: SWS- BHCS- 11-02-2 INTERVAL O 11,474 -11,514' SQZD/ 11,570 -11,598' SQZD/ 11,590 -11,600' Open/4-28-93 11,616-11,620 11,620-11,628' 11,634-11,640 11,640-11,644' 11,644-11,672' OPEN/4-12-93 OPEN/4-12-93 OPEN/4-12-93 SQZD/6-4-89 OPEN/6-30-89 Squeeze holes approx. 11,200' Whipstock approx. 11,270' Bridge Plug approx. 11,460' 7" BAKER PACKER I (SAB w/"K" ANCHOR I 1 1, 6 1 8' (4.ooo" ~D) 4 1/2 .... XN" NIPPLE I 11,626' (OTIS) (3.725" ID) 4 1/2" TBG TAIL (VVLEG) I 1 1,629' i (ELMD) I 11,620' NOTE: PERFS From 11,590-11,600' and 11,616-11,620 FT BKB WERE SHOT THRU THE 4.5" TAILPIPE FISH: FINGER OFF OF TEL LOST 8-17-90 (4"L x 1 1/2"W x 3/8" T) FISH: 1 1/2" OD DGLV DROPPED 6-22-89 -11,830' WLM OR DEEPER. PBTD ~ 7", 26#/ft, L-80, IJ4S,I 11.91-~'1 : · .-:: :-:-:-::-:-:-:-:-: :-:-- -- i 4 1/2 .... X" NIPPLE (OTIS) (3.813" ID) I 10,610' BAKER PBR SEAL ASSYt 10,631' 9 5/8" BAKER PACKER [ 10,653'I (HB) (4.000"ID) 4 1/2", 12.6#/ft, L-80 TAILPIPE ~Top 7" liner I I 9-5/8", 47#/ft, b-80, BTRS 110,959'I 7/8" Cemented Liner Window milled through 4 1/2" and 7" strings. C-26 Vertical Section 0 835O 8400 845O 8500 ~-TSA 8550 8600 Path Distance(Feet) 500 1,000 1,500 2,000 2,500 TSGR8404ss, 11,018 MD Angle @ K.O.= 31 deg MD:I 1270 8650 8700 88508800 ". ..... Tot 8900 8950 9000 Marker Depths (~Orig Wellbore TSAD TZ3 TZ2C I 8,940 8,509Jrt TVD 8,7oo1 8,7801ft TVD 8,94O Ift TVD Kick Off 8,617 ft TVD 11,270 ft MD Deprtr (~KO 6,243 ft MD KO Pt 11,27O MD New Hole 1518 Total MD 12,788 TVD TD 8,960 DLS deg/100 Tool Face Length Curve 1 0 0 20 Curve 2 24 75 79 Curve 3 24 80 146 Curve 4 24 55 334 Curve 5 8 -90 299 Curve 6 8 180 122 Curve 7 8 0 119 Curve 8 6 90 399 1,518 Drawn: 7/28/98 9:09 Plan Name: Case 401 -3,500 C-26 ~ -3,5001 -3,000 -2 500 -4,000 -4,500 -5,000 Well Name C-26 CLOSURE Distance 5,315 ft Az 216 deg NEW HOLE E/W (X) N/S (Y) Kick Off -2,969 -5,475 TD -3,138 -4,290 State Plane 661,217 5,955,283' Surface Loc 664,355 5,959,573 DLS deg/100 Tool Face Length Curve 1 0 0 20 Curve 2 24 75 79 Curve 3 24 80 146 Curve 4 24 55~ 334 Curve 5 8 -90 299 Curve 6 8 180 122 Curve 7 8 0 119 Curve 8 6 90 399 1,518 X distance from Sfc Loc -6,000 Drawn: 7/28/98 9:09 Plan Name: Case 401 C-26A CT Drilling & Completion BOP Z · 22.5" 18"i 38" 2 3/8" CT ---~ I10,000psi Pack-OffI 7 1/16" Annular Blind/Shear 7 1/16" Pipe/Slip ~ 2 3/8" Pipe 7 1/16" x 5,000 psi SWAB OR MASTER VALVE WELL PERMIT CHECKLIST COMPANY ~,-~,~ WELl_ NAME,~_~ FIELD & POOL ~'_~._~::~ INIT CLASS /~z.,.' ,/~::~ ? GEOL ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APPR DATE Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N 'Y N Y N Y N N N N N N N q.~N Y N Y N GEOLOGY 30. 31. 32. 33. 34. 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... N 25. BOPEs, do they meet regulation ................ N 26. BOPE press rating appropriate; test to ~.¢OO psig. 27. Choke manifold complies w/APl RP-53 (M~"y 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. Permit can be issued w/o hydrogen sulfide measures ..... ·~YY NN Y r¢.-'~.~,..,,~ Data presented on potential overpressure zones ....... Y N -- Seismic analysis of shallow gas zones .............. Seabed condition survey (if off-shore) ............. Contact name/phone for weekly progress reports ....... / Y N [exploratory only] ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste"~.suitable receiving zone; ....... Y N (B) will not contaminate fr~ter; or cause drilling waste... Y N to surface; _ ~ (C) will not impair mechanical integrity o-'f-t.~well used for disposal; Y N (D) will not damage producing formation or ira"pair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N AREA APPR DATE PROGRAM: exp [] dev_"~redrll~ serv [] wellbore seg Il ann. disposal para req UNIT# ,//-~--. ~c:::2'% ON/OFF SHORE GEOLOGY: ENGINEERING: UIC/Annular - - JDt-I~ COMMISSION: DW~ RNC CO Comments/Instructions: M:chel~list rev 05/29/98 dff:C:\msoffice\wordian\diana\(;l'~ecMist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well .History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . . ............................ ....... SCHLUMBERGER ....... * .......... ~ ................. COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : C-26A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292083401 REFERENCE NO : 99065 LIS Tape 9'~rification Listing Schlumberger Alaska Computing Center 15-FEB-1999 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE . 99/02/15 ORIGIN . FLIC REEL NAME : 99065 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, PRUDHOE BAY, C-26A, API #50-029-20834-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/15 ORIGIN : FLIC TAPE NAME : 99065 CONTINUATION # : 1 PREVIOUS TAPE : CON24ENT : BP EXPLORATION, PRUDHOE BAY, C-26A, API #50-029-20834-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: C-26A API NUMBER: 500292083401 OPERATOR: BP EXPLORATION (ALASKA) LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 15-FEB-99 JOB NUMBER: 99065 LOGGING ENGINEER: SPENCER OPERATOR WITNESS: ANGELL SURFACE LOCATION SECTION: 19 TOWNSHIP: liN RANGE: I4E FNL: 1645 FSL: FEL: 1032 FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: 71.71 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SiZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 7. 000 11283.0 26. O0 2ND STRING 2. 875 13053 . 0 6.16 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape 9~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: SPERRY- SUN BASELINE DEPTH 88888 0 12965 0 12964 5 12958 0 12955 0 12948 0 12945 0 12942 0 12935 5 12912 0 12911 5 12909 5 12908 0 12901 5 12899 5 12885 0 12883 5 12868 5 12863 5 12861 0 12847 0 12845 5 12818 0 12817 0 12805 0 12798 0 12796 5 12783 5 12783 0 12768 5 12756 0 12747 5 12734 5 12733 5 12729 5 12729 0 12725 0 12699.0 12695.5 12682.5 12681.5 12679.0 12678.5 12677.0 12676.5 EQUIVALENT UNSHIFTED DEPTH GRCH CNT 88889.5 88890.0 12966.5 12966.5 12957.5 12957.5 12954.5 12954.5 12947.0 12947.0 12945.5 12945.5 12942.0 12942.0 12934.0 12934.0 12913.5 12913.0 1291 O. 0 12903.5 12901.0 12883.0 12866.5 12860.0 12847.5 12818.0 12796.0 12784.0 12767.5 12755.0 12745.5 12731.5 12728.0 12723.0 12695.0 12694.0 12679.5 12677.5 12675.5 12910.0 12903.5 12901.0 12885.0 12866.5 12845.0 12818.5 12805.5 12797.0 12784.5 12767.5 12755.0 12745.5 12731.5 12728.0 12679.5 12678.0 12675.5 PAGE: LIS Tape ~£'ification Listing Schlumberger Alaska Computing Center 12669.5 12662 0 12661 5 12642 0 12638 5 12635 0 12634 5 12632 5 12632 0 12627 0 12602 5 12590 5 12578 0 12547 5 12529 5 12438 0 12388 0 12378 5 12375 0 12373 5 12369 0 12354 0 12352 5 12340 5 12334 0 12326 5 12304 0 12303 5 12293.5 12291.5 12291.0 12284.0 12215.0 12214.5 12161.0 12160.0 12112.0 12108.5 12108.0 12103.5 12060.0 12059.5 12052.5 12044.0 12042.5 12037.5 12028.5 12027.0 12019.5 12013.5 12007.0 11984.0 11983.5 11968.0 11967.0 11953.5 12667.5 12660.5 12660.5 12641.0 12641.0 12638.5 12634.5 12634.5 12632.0 12632.0 12626.5 12626.5 12599.5 12599.5 12589.0 12589.0 12577.5 12577.5 12546.0 12546.0 12527.5 12527.5 12437.0 12437.0 12387.0 12387.0 12376.5 12376.5 12371.0 12371.0 12367.5 12367.5 12351.0 12351.0 12338.0 12338.0 12330.5 12330.5 12324.5 12324.5 12300.0 12300.0 12290.0 12290.0 12287.0 12287.0 12280.5 12280.5 12211.0 12211.0 12158.0 12158.0 12109.0 12109.0 12104.5 12104.5 12101.0 12101.0 12055.5 12055.5 12049.0 12049.0 12040.5 12040.5 12035.5 12035.5 12025.5 12025.5 12016.5 12016.5 12010.5 12010.5 12004.5 12004.5 11983.0 11983.0 11966.0 11966.0 11951.5 11951.5 15-FEB-1999"~c~'46 PAGE: 3 LIS Tape ~ification Listing Schlumberger Alaska Computing Center 11940.5 11940.0 11902.0 11891.0 11883.0 11859.0 11841.5 11836.5 11835 5 11831 0 11821 5 11812 0 11806 5 11783 5 11756 5 11747 5 11746.5 11745.5 11742.5 11740.5 11737.0 11726.5 11719.0 11717.5 11716.5 11699.0 11698.0 11695.5 11695.0 11691.0 11680.5 11674.5 11674.0 11671.5 11671.0 11651.5 11649.5 11634.0 11627~ 0 11626.0 11620.0 11619.0 11616.5 11612.5 11612.0 11607.5 11603.5 11601.0 11582.5 11582.0 11578.5 11561.5 11554.0 11549.0 11548.0 11540.5 11938.0 11902.5 11889.5 11882.0 11858.5 11840.5 11834.5 11829.0 11818.5 1181 O. 5 11805.5 11784.5 11754.5 11746.0 11745.0 11740.0 11735.0 11726.0 11720.0 11716.0 11698.0 11695.5 11690.0 11674.0 11670.5 11649.0 11646.0 11632.0 11623.5 11616.5 11613.5 11609.0 11606.0 11601.0 11598.0 11579.5 11576.0 11560.0 11553.5 11548.5 11538.0 11938.0 11902.5 11889.5 11882.0 11858.5 11840.5 11834.5 11829.0 11818.5 11810.5 11805.5 11784.5 11745.0 11740.0 11735.0 11726.0 11720.0 11716.0 11698.0 11695.5 21679.0 11674.0 11670.0 11632.0 11623.5 11616.5 11613.5 11609.0 11606.0 11601.0 11598.0 11579.5 11576.0 11560.0 11553.5 11549.0 15-FEB-1999 ~46 PAGE: LIS Tape ~'~ification Listing Schlumberger Alaska Computing Center 11540.0 11533.5 11529.5 11528.5 11525.5 11524.0 11517.0 11502.0 11501.0 11475.5 11473.0 11461.5 11460.5 11454.5 11453.5 11443.5 11426.5 11425.5 11423.0 11422.5 11410.5 11408.5 11405.0 11400.0 11399.5 11399.0 11392.5 11392.0 11389.5 11388.0 11379.0 11378.5 11371.0 11370.5 11369.0 11368.0 11367.0 11366.5 11353.0 11348.0 11335.0 11334.5 11333.0 11332.5 11329.0 11328.0 11323.0 11312 0 11309 0 11308 0 11302 5 11299 0 11293 5 11291 0 11288 5 11285 0 11532.0 11527.5 11522.5 11513.0 11499.5 11474.0 11471.0 11461.0 11453.0 11443.0 11424.5 11421.5 11407.0 11402.0 11398.0 11395.5 11388.0 11385.0 11378.5 11370.0 11367.5 11365.5 11352.5 11347.0 11334.0 11331.5 11328.5 11322.5 11311.5 11308.0 11302 0 11297 5 11292 0 11290 5 11288 5 11284 5 11538.0 11532.0 11527.5 11522.5 11499.5 11474.5 11461.0 11453.0 11443.0 11424.5 11421.5 11407.0 11395.5 11388.0 11385.0 11378.5 11369.5 11367.5 11365.5 11352.5 11347.0 11334.0 11331.5 11328.5 11322.5 11311.5 11308.0 11302.0 11288.5 11284.5 15-FEB-1999'~--~F46 PAGB : LIS Tape 962~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 ~-_-. 46 100.0 $ REMARKS: 99.5 99.5 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE MCNL DATA AQUIRED ON BP EXPLORATION'S C-26A WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE MWD GAb94A RAY, ALSO PASS #1 NRAT AND THE MWD GANk~A RAY, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUTBVARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12977.5 10879.5 CNT 12980.0 10879.5 $ CURVE SHIFT DATA - PASS TO PASS (M~EASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNT R~S: THIS FILE CONTAINS CASED HOLE MCNL PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA _THERE ARE LIS Tape ¥~fication Listing Schlumberger Alaska Computing Center 15-FEB-1999"~_=46 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 1 1 t 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 ! 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 t 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 CCL CArT V O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 12980.000 GRCH. CNT -999.250 NRAT. CNT 10.821 CCL.CNT 85.000 DEPT. 10879.500 GRCH. CNT 54.770 NRAT. CNT 23.938 CCL.CNT 85.417 NCNT. CNT 6716.097 FCNT. CNT 436.413 NCNT. CNT 3061.603 FCNT. CNT 135.370 ** END OF DATA ** LIS Tape %e~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 _~'46 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEAl,ER FILE NUMBER: 2 EDITED CEFRVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SOY~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12975.5 12696.0 CNT 12975.0 12698.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH ............. 88888 0 12976 5 12971 5 12968 5 12967 0 12959 5 12955 0 12948 0 12947 0 12945 5 12941 5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNT 88887.5 88885.0 12973.5 12968.0 12966.0 12966.5 12958.0 12947.0 12942.5 12958.0 12953.0 12947.5 12945.5 LIS Tape %=~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 PAGE: 12933 0 12930 5 12922 0 12919 5 12913 0 12907 5 12905 5 12898 5 12897 5 12886.0 12884.0 12881.5 12879.0 12872.0 12870.5 12864.0 12861.0 12857.0 12854.0 12852.0 12851.0 12845.5 12839.0 12835.0 12832.0 12829.0 12823.0 12821.5 12820.0 12811.5 12809.0 12804.5 12802.0 12799.5 12798.0 12791. 0 12789.0 12788.5 12784.0 12782.5 12777.0 12772.5 12769.5 12756.5 12748.5 12748.0 12744.5 12742.5 12740.5 12733.0 12729.0 12725.0 12724.0 12719.0 1271 6.0 12930.5 12921.0 12910.0 12901.0 12885.5 12870.5 12860.5 12855.5 12851.0 12849.5 12844.0 12834.0 12828.0 12821.5 12808.0 12796.5 12790.0 12788.5 12784.0 12781. 0 12775.0 12767.5 12744.0 12741.0 12738.0 12728.0 12721.0 12715.5 12934.5 12930.5 12924.0 12915.0 12908.0 12898.0 12889.0 12885.5 12881.0 12874.0 12866.5 12854.0 12840.0 12830.5 12822.0 12820.5 12811.5 12804.5 12802.5 12797.0 12788.5 12772.5 12756.0 12747.0 12741.0 12733.0 12726.5 12720.5 LIS Tape 9e~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 .~ 4 6 PAGE: 10 12704.0 12704.0 12698.0 12700.0 100.0 100.0 102.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE MCNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NRAT PASS #2 AND NRAT PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NIR4B ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD A~MB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 2 i 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 ! 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 i 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 I 1 4 68 0000000000 CCL CNT V O0 000 O0 0 2 ! ! 4 68 0000000000 LIS Tape'~tification Listing Schlumberger Alaska Computing Center 15 -FEB-1999-~ ~ : 46 PAGE: 11 * * DA TA * * DEPT. 12975. 500 GRCH. CNT 30. 204 NRAT. CNT -999. 250 CCL. CNT -999. 250 DEPT. 12696. 000 GRCH. CNT 29.174 NRAT. CNT -999. 250 CCL. CNT -999. 250 NCNT. CNT NCNT. CNT -999.250 -999.250 FCNT. CNT FCNT. CNT -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS CNT $ REMARKS: THIS FILE CONTAINS THE ARIT~4ETIC AVERAGE OF PASSES 1 & 2. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORF~AT DATA LIS Tape ~£'ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 ~_~.f46 PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 .73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HE.Y) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 3 ! t 4 68 0000000000 NCNT CNAV CPS O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNAV CPS O0 000 O0 0 3 1 ! 4 68 0000000000 NRAT CNAV O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 12977.500 GRCH. CNT 32.535 NCNT. CNAV -999.250 FCNT. CNAV NRAT. CNAV -999.250 DEPT. 12690.000 GRCH. CNT 22.398 NCNT. CNAV -999.250 FCNT. CNAV NRAT. CNAV -999.250 -999.250 -999.250 ** END OF DATA ** LIS Tape 9~-~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999~.46 PAGE: 13 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE ' FLIC VERSION · O01CO1 DATE · 99/02/15 ~REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.1000 FILE SU~fiVA~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 13005.0 10864.0 MCNL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR G~ RAY MCNL MEMORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 20-AUG-98 RELOO33A 12986.0 12991.0 10880.0 12978.0 TOOL NUMBER GR MCNL LIS Tape '-, ~rification Listing Schlumberger Alaska Computing Center 15-FEB-1999'= J;46 PAGE: 14 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 13053.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM)'. WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MA TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 2180 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 32500 TOOL STANDOFF (IN): REMARKS: DEPTH CORRELATED TO SPERRY-SUNI~WD LOG DATED AUG 10 TO 19, 1998. THIS FILE CONTAINS THE RAW DATA FROM PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 LIS Tape ¥~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999~=_~.~46 PAGE: 15 TYPE REPR CODE VALUE 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE lvTgSfBNUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 CVEL PS1 F/HR O0 000 O0 0 4 1 1 4 68 0000000000 GR PS1 GAPI O0 000 O0 0 4 1 1 4 68 0000000000 NCNT PS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 FCNT PS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 NRAT PS1 O0 000 O0 0 4 1 1 4 68 0000000000 CCLD PS1 V O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. FCNT. PS1 13005.000 CVEL.PS1 -999.250 NRAT. PS1 DEPT. FCNT. PS1 10864.000 CVEL.PS1 -999.250 NRAT. PS1 -999.250 GR.PS1 -999.250 NCNT. PS1 -999.250 CCLD. PS1 -999.250 -999.250 GR.PS1 -999.250 NCNT. PS! -999.250 CCLD. PS1 85.000 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION · O01CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape ¥~£'~fication Listing Schlumberger Alaska Computing Center 15-FEB-1999~.~'46 PAGE: 16 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE ~ LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.1000 FILE S~Y VENDOR TOOL CODE START DEPTH MCNL 13005.5 $ LOG HEADER DATA STOP DEPTH 12682.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAb~VZA RAY MCNL MEMORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATO~E (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 20-AUG-98 RELOO33A 12986.0 12991.0 10880.0 12978.0 TOOL NUMBER GR MCNL 13053.0 LIS Tape ¥.~r~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 ~_~.~46 PAGE: 17 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 2180 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 32500 TOOL STANDOFF (IN): REMARKS: DEPTH CORRELATED TO SPERRY-SUN MWD LOG DATED AUG 10 TO 19, 1998. THIS FILE CONTAINS THE RAW DATA FROM PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE ! 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape '~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 PAGE: 18 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 CVEL PS2 F/HR O0 000 O0 0 5 1 1 4 68 0000000000 GR PS2 GAPI O0 000 O0 0 5 1 1 4 68 0000000000 NCNTPS2 CPS O0 000 O0 0 5 1 1 4 68 0000000000 FCNT PS2 CPS O0 000 O0 0 5 1 1 4 68 0000000000 NRAT PS2 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD PS2 V O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 13005.500 CVEL.PS2 -999.250 GR.PS2 -999.250 NCNT. PS2 FCNT. PS2 -999.250 NRAT. PS2 -999.250 CCLD.PS2 -999.250 -999.250 DEPT. 12682.500 CVEL.PS2 -999.250 GR.PS2 -999.250 NCNT. PS2 -999.250 FCNT. PS2 -999.250 NP~T. PS2 -999.250 CCLD.PS2 85.041 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : 001 CO1 DATE : 99/02/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/15 ORIGIN : FLIC TAPE NAME : 99065 CONTINUATION # : 1 PREVIOUS TAPE : CONk4ENT : BP EXPLORATION, PRUDHOE BAY, C-26A~ API #50-029-20834-01 LIS Tape ¥=~ification Listing Schlumberger Alaska Computing Center 15-FEB-1999 ~.~46 PAGE: 19 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/02/15 ORIGIN : FLIC REEL NAME · 99065 CONTINUATION # : PREVIOUS REEL : CO~4ENT : BP EXPLORATION, PRUDHOE BAY, C-26A, API #50-029-20834-01 Sperry-Sun Drillin9 Services LIS Scan Utility Thu Dec 03 14:10:54 1998 Reel Header Service name ............. LISTPE Date ..................... 98/12/03 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writin9 Technical Services Library. Tape Header Service name ............. LISTPE Date ..................... 98/12/03 Origin ................... STS Tape Name ............ - .... UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writin9 Library. Technical Services Scientific Scientific Physical EOF Comment Record TAPE HEADER PRUDHOE BAY 1/NIT MND/MXD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 A/K-MW- 80333 B. JA/{N PARKER/WHITL DEC 0S i998 ;,J~ Oil & Gas Cons. Commissio~ ~-26~ 500~9~083~01 BP EXPLO~TION (~~) , INC. SPERRY-S~ DRILLING SERVICES 03 -DEC- 98 MWD RI/N 3 MWD RLIN 4 A/{-MW- 80333 AK-MW- 80333 B. JAIql~ B. JAHN MCMULLEN/SEV MCMULLEN/SEV JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 AK-MW-80333 B. JAHN MCMULLEN/SEV MWD RUN 7 MWD RUN 8 AK-MW- 80333 AK-MW- 80333 B. JAHN B. JAHN MCMULLEN/SEV MCMULLEN/SEV JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: MWD RUN 9 AK-MW-80333 B.JAHN MCMULLEN/SEV MWD RUN 10 MWD RUN 11 AK-MW-80333 AK-MW-80333 B.JAHN B.JAHN MCMULLEN/SEV MCMULLEN/SEV 19 TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD lST STRING 2ND STRING 3RD STRING PRODUCTION STRING liN 14E 1645 1032 71.70 .00 .00 REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 10959.0 7.000 11291.0 4.500 11291.0 3.750 13057.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1,3,4,AND 6 THROUGH 11 ARE DIRECTIONAL AND NATURAL GAMMA PROBE UTILIZING SCINTILLATION TYPE DETECTOR (NGP). 3. MWD RUNS 2 AND 5 DRILLED NO FOOTAGE AND ARE NOT PRESENTED. 4. DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM D. DOUGLAS FOR TRACY LOVE OF BP EXPLORATION (ALASKA), INC. ON 11/02/98. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13057'MD, 8951'SSTVD. SROP = SMOOTHED RATE OF PENETRATION. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 11275.0 13031.0 ROP 11284.0 13057.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 3 MWD 4 MWD 6 MWD 7 MWD 8 MWD 9 MWD 10 MWD 11 $ REMARKS: MERGED MAIN PASS. $ MERGE TOP MERGE BASE 11295.0 11313.0 11313.0 11409.0 11409.0 11449.0 11449.0 11697.0 11697.0 11888.0 11888.0 12291.0 12291.0 12427.0 12427.0 12669.0 12669.0 13057.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11275 13057 12166 3565 11275 GR 0 330.45 31.1327 3513 11275 ROP 9.63 5040 98.5211 3547 11284 Last Reading 13057 13031 13057 First Reading For Entire File .......... 11275 Last Reading For Entire File ........... 13057 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NI3MBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11275.0 ROP 11284.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11287.5 11312.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MIlD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 10-AUG-98 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 11313.0 11295.0 11313.0 30.9 30.9 TOOL NUMBER NGP SPC 264 3.750 3.8 FLOPRO 8.90 .0 9.0 5.6 .000 .000 .000 .000 120.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11275 11312.5 11293.8 76 11275 GR 17.76 37.64 24.1137 26 11275 ROP 13.67 5040 1590.22 58 11284 Last Reading 11312.5 11287.5 11312.5 First Reading For Entire File .......... 11275 Last Reading For Entire File ........... 11312.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type.. ............... LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11288 . 0 11383 . 5 ROP 11313 . 0 11409.0 $ LOG HEADER DATA DATE LOGGED: 12-AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 48.9 MAXIMUM ANGLE: 54.2 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 11409.0 11313.0 11409.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 264 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 8.80 .0 9.1 5.8 .000 .000 .000 .000 144.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .6 REMARKS: $ Data Format Specification Record Data Record Type ............. ~ .... 0 Data Specification Block Type ..... 0 Logging.Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11288 11409 11348.5 243 11288 GR 18.44 330.45 47.1744 192 11288 ROP 9.63 61.69 25.9543 193 11313 Last Reading 11409 11383.5 11409 First Reading For Entire File .......... 11288 Last Reading For Entire File ........... 11409 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11384.0 ROP 11409.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11428.0 11450.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin 12-AUG-98 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 11449.0 11409.0 11449.0 48.9 54.3 TOOL NIIMBER NGP SPC 264 3.750 3.8 FLOPRO 8.80 .0 9.5 5.8 .000 .000 .000 .000 140.0 o6 Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11384 11450 11417 133 11384 GR 20.43 134.31 35.5996 89 11384 ROP 33.71 80.37 44.2471 82 11409.5 Last Reading 11450 11428 11450 First Reading For Entire File .......... 11384 Last Reading For Entire File ........... 11450 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE GR ROP $ LOG HEADER DATA DATE LOGGED: START DEPTH STOP DEPTH 11428.5 11670.5 11450.5 11697.0 14-AUG-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG- INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTPJXTE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 11697.0 11449.0 11697.0 53.9 68.9 TOOL NUMBER NGP SPC 264 3.750 3.8 FLOPRO 8.80 .0 9.3 7.0 .000 .000 .000 .000 .6 129.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 First Last Name Min Max Mean Nsam Reading Reading DEPT 11428.5 11697 11562.8 538 11428.5 11697 GR 21.12 121.74 29.5466 485 11428.5 11670.5 ROP 27.62 1852.92 71.3285 494 11450.5 11697 First Reading For Entire File .......... 11428.5 Last Reading For Entire File ........... 11697 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NLIMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11671.0 11861.5 ROP 11699 . 0 11888 . 0 $ LOG HEADER DATA DATE LOGGED: 15-AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR RE2LL-TIME) : TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 11888.0 11697.0 11888.0 MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 71.9 77.4 TOOL NUMBER NGP SPC 264 3.750 3.8 FLOPRO 8.80 .0 9.8 6.4 .000 .000 .000 .000 141.2 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11671 11888 11779.5 435 11671 GR 19.26 156.3 54.6084 382 11671 ROP 21.78 1627.04 108.908 379 11699 Last Reading 11888 11~61.5 11888 First Reading For Entire File .......... 11671 Last Reading For Entire File ........... 11888 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate fileS. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11862.0 12266.0 ROP 11888.5 12291.5 $ LOG HEADER DATA DATE LOGGED: 16 -AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM A/~GLE: 82.2 - MAXIMUM ANGLE: 90.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP $ NATURAL GAMMA PROBE BOREHOLE AND CASING DATA MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 12291.0 11888.0 12291.0 TOOL NUMBER NGP SPC 243 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 3.750 3.8 FLOPRO 8.8O .0 10.0 6.8 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 API 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 150.0 First Name Min Max Mean Nsam Reading DEPT 11862 12291.5 12076.8 860 11862 GR 18.34 36.71 23.6933 809 11862 ROP 16.24 119.25 68.0645 807 11888.5 Last Reading 12291.5 12266 12291.5 First Reading For Entire File .......... 11862 Last Reading For Entire File ........... 12291.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12266.5 12404.5 ROP 12292 . 0 12430 . 5 $ LOG HEADER DATA DATE LOGGED: 17-AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 81.1 MAXIMUM ANGLE: 87.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE A/FD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 12427.0 12291.0 12427.0 TOOL N-UMBER NGP SPC 243 3.750 3.8 FLOPRO 8.80 .0 9.6 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 7.6 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 API 4 1 68 4 2 ROP MWD 9 FT/H 4 1 68 8 3 147.4 First Name Min Max Mean Nsam Reading DEPT 12266.5 12430.5 12348.5 329 12266.5 GR 16.18 49.39 25.7575 277 12266.5 ROP 23.54 117.94 77.4431 278 12292 Last Reading 12430.5 12404.5 12430.5 First Reading For Entire File .......... 12266.5 Last Reading For Entire File ........... 12430.5 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12405.0 ROP 12431.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12642.5 12669.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: 17-AUG-98 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 12669.0 12427.0 12669.0 82.9 87.7 TOOL NUMBER NGP SPC 264 3.750 3.8 FLOPRO 8.80 15.0 9.3 6.8. .000 .000 .000 .000 158.5 MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68 4 2 ROP MWD 10 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 12405 12669 12537 529 12405 GR 20.04 113.35 27.102 476 12405 ROP 30.17 299.12 72.7241 477 12431 Last Reading 12669 12642.5 12669 First Reading For Entire File .......... 12405 Last Reading For Entire File ........... 12669 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11328 . 0 13030 . 5 ROP 11355.5 13057.0 $ LOG HEADER DATA DATE LOGGED: 19-AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 86.1 MAXIMUM ANGLE: 94.3 MSC 1.32 MSC 1.32 5.74, 3.01e MEMORY 13057.0 12669.0 13057.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 243 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTP~ATE AT MT: MUD CAKE AT MT: FLOPRO 8.80 17.0 9.3 6.0 .000 .000 .000 .000 163.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .6 REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction .................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 11 API 4 1 68 4 2 ROP MWD 11 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11328 13057 12192.5 3459 11328 GR 18.19 144.7 29.2248 827 11328 ROP 25.78 150.94 77.5828 825 11355.5 Last Reading 13057 13030.5 13057 First Reading For Entire File .......... 11328 Last Reading For Entire File ........... 13057 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/03 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/12/03 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/12/03 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Scientific Technical Services Physical EOF Physical EOF End Of LIS File