Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-156 • bp BP Exploration (Alaska) Inc. A Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission 4JOANEDAuG 0 7 2012 333 West 7 Avenue Anchorage, Alaska 99501 �. Subject: Corrosion PM-2 J Cor oslon Inhlbltor Treatments of GPMA PM Sub 1°0- L / 4 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM -2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 1020 6/22/2009 I -- P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 _ 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 22 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2 -42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2 -43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2-47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 P2-04 (PTD #1981560} Approval to work on and flow well without SSSV Page 1 of 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.comJ ~~~ ~l(~,~(2~~, Sent: Friday, November 21, 2008 3:25 PM To: Warner, Ross L; G ANC Wellwork Program; GPB, LPC DS Ops Lead; GPB, LPC DS Operator; Regg, James B (DOA) Cc: Carr, Jessie L; Frankenburg, Amy; Michel, Charlie Subject: P2-04 (PTD #1981560) Approval to work on and flow well without SSSV AN, Per a phone conversation between Jim Regg and myself regarding the circumstance for well P2-04 (PTD #1981560), approval has been obtained to continue well work operations and to flow the Weil to obtain a well test. A SSSV is required to be set in well P2-04 by December 4, 2008 for continued production. Notification will be sent to the AOGCC once the SSSV is set. Please iet me know if you have any questions. Thank you, Anna ~Du6e, ~'. E. Well Integrity Coordinator GPB Wells Group Phone; (907j 659-5102 Pager: (907) 659-5100 x1154 From: Warner, Ross L Sent: Tuesday, November 18, 2008 11:10 AM To: G ANC Wellwork Program Cc: Carr, Jessie L; Frankenburg, Amy; GPB, LPC DS Ops Lead; GPB, LPC DS Operator; NSU, ADW Well Integrity Engineer; Michel, Charlie Subject: P2-04 Sample and Brush & Flush Enclosed is a program for P2-04. Anna, This is the well I mentioned this morning in the Anchorage Office. « File: P2-04 Sample, Brush and Flush.xls » Ross Warner 250-3441 11 /21 /2008 ~ ~ STATE OF ALASKA RE ALASKA OIL AND GAS CONSERVATION COMMISSION CEIVED REPORT OF SUNDRY WELL OPERATIONS AUG 3 1 2004 Stimulate 0 Aluklrf!¥ & Ga",~¡Commi ¡Ol WaiverD Time ExtensionO Anchorage Re-enter Suspended Well 0 5. Permit to Drill Number: 1 6. API Number 50-029-22907-00-00 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program 0 RepairWeliD PluQ PerforationsD Pull TubingO Perforate New PoolO Operation Shutdown 0 Perforate 0 4. Current Well Class: Development ŒJ Stratigraphic 0 9. Well Name and Number: P2-o4 10. Field/Pool(s): pt Mcintyre Oil Field / Pt Mcintyre Oil Pool 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 50.00 8. Property Designation: ADL-o34622 11. Present Well Condition Summary: ExploratoryD ServiceD Total Depth measured 13329 feet true vertical 8954.3 feet Effective Depth measured 12953 feet true vertical 8952.9 feet Casing Conductor Liner Liner Production Production Surface Length 80 1751 47 11007 395 5201 Perforation depth: Plugs (measured) Junk (measured) 12952 None Size 20" 91.5# H-40 4-1/2" 12.6# 13Cr80 4-1/2" 12.6# L-80 7" 26# L.80 7" 29# 13CR80 9-5/8" 40# L-80 MD TVD 39 119 39.0 - 119.0 11202 - 12953 8882.1 - 8952.9 12953 - 13000 8952.9 - 8953.1 36 - 11043 36.0 - 8855.3 11043 - 11438 8855.3 - 8924.0 38 - 5239 38.0 - 4955.8 Burst 1490 8430 8430 7240 8160 5750 Collapse 470 7500 7500 5410 7020 3090 Measured depth: 11460 -11592,11636 -11768,11812 - 11944, 11988 -12120,12164 -12296, 12340 -12406,12626 - 12758 12802 - 12912 True vertical depth: 8926.73 - 8929.56, 8928.51 - 8932.45,8934.87 - 8940.12,8942.22 - 8949.77, 8949.95 - 8949.65,8949.62 - 8950.24 8953.94 - 8952.15,8951.95 - 8952.68 Tubing (size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 34 11218 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer 4-1/2" Camco WRDP-2 SSV 5" Baker ZXP Liner Top Packer @ 11162 @ 2018 @ 11209 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Iniection Data 13 Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure Tubing Pressure 213 0.4 235 1130 216 184 0.4 213 0 230 14. Attachments: Copies of Logs and Surveys run - Daily Report of Well Operations. ! 15. Well Class after proposed work: Exploratory 0 16. Well Status after proposed work: OilŒ] GasD 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Signature Form 10-404 Revised 4/2004 Title Development ŒI serviceD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Phone 564-4657 Production Technical Assistant 8/27/04 nq'G'~'A' Date RBDMS BFL SEP 0 1 2004 ~ ~ P2-04 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 06/15/04 WHP=225/1130/100.PUMPED 270 BBLS CRUDE AT 160* AND 270 BBLS DIESEL AT 160* DOWN TBG THROUGH COIL FOR HOT TBG WASH. WHP=300/1900/250 06/15/04 Mill CIBP. MIRU, RIH w/2.75" JSN and jet tubingh with 160 deg F erude to remove paraffins to 6800'. Hot diesel to tail. RIH and tag CIBP at 11648' etm. Roll hole overto 1% KCL while POOH. Lay down JSN and MU Baker 2-7/8" motor w/3.70" three bladed junk mi11.11620'- 11953' 06/16/04 RIH w/2-7/8" motor and 3.70" three bladed junk mill. Tag CIBP @ 11641' etm. Mill through and push to PBTD @ 12952. POOH w/Baker 8.70" OD mill. Eneournter slight over pulls in 4- 1/2" while POOH. most likely due to small debris left over from milling. Cap well with 5 bbls 50/50. FLUIDS PUMPED BBLS 330 Crude 295 1 % KCL 17 50/50 Methonal/Water 542 1% XS KCL 332 Diesel 1516 TOTAL Page 1 ~ TREE = ? --- WB..LHEAD - CrN ACTU<\ TOR - BAKffi C KB. ELEV = 50' BF. ELEV = KOP- 2737' Max Angle = 93 @ 11580' Datum MD = 11025' Datum TVD = 8800' SS 9-518" CSG, 40#, L-BO, ID = 8.835" Minimum ID = 3.725" @ 11205' HES XN NIPPLE 4-112" TOO, 12.6#, 13m, 0.0152 bpf , ID = 3.958" TOPOF 4-1/2" Lf'.R 7"CSG.29#,L-BO.ID=6.184" 11438' ÆRFORA TON SUMMARY REF LOG: ZDUGR ON 08117/93 ANGLE AT TOP PERF: 83 @ 11460' Note: Refer to Production DB for historical nert data SIZE SA" NTffiVAL Opn/Sqz )A. TE 2-3/4" 4 11460-11592 0 09103198 2-3/4" 4 11636-11768 0 09/03198 2-3/4" 4 11812-11944 0 09103198 2-3/4" 4 11988-12120 0 09103198 2-3/4" 4 12164-12296 0 09/03198 2-3/4" 4 12340-12406 0 09/03198 2-3/4" 4 12626-12758 0 09103198 2-3/4" 4 12802-12912 0 09103198 P2-04 . 2018' ST MD 1 4185 2 5302 36668 4 7823 5 9101 69968 7 10771 11162' 11195" 11205" ~ I SAFErY NOTES: I-DRIZONTAL WELL .1 4.5" CAMCO BAL-O (4-1/2" WRDP-2 RUN 3/4/00), ID = 3.81" GAS LIFT MANDRELS TVD DEV TYPE VLV LATCH FQRT DATE 4066 33 KGB-2-LS BTM INT 5010 31 KGB-2-LS BTM INT 6017 47 KGB-2-LS BTM INT 6808 46 KGB-2-LS DOME BTM INT 12 02/02/02 7710 44 KGB-2-LS BTM INT 8309 49 KGB-2-LS BTM INT 8761 66 KGB-2-LS SO BTM INT 16 02/02/02 7" X 4.5' BAKffi 8-3 ÆRM A<R, ID = 3.88" 4-1/2" I-ESX NP, D =3.81" 4-1/2" I-ES XN NIP, ID = 3.72" 11215" 4-415" TBG TAIL. WLffi, D = 4.0" I 11223' H B..MD TT LOGGED 11/25199 I PBTO 4-1/Z' Lf'.R, 12.6#, 13m, .0152 bpf, D = 3.958" TO 12952' 13000' 13329' )A. TE REV BY COMMENTS DATE REVBY COMMENTS 09106198 ORIGINAL eOMPLETION 09114/01 RNITP CORRECllONS 02102102 DTRlKK GLV #4 & #7 C/O 04/16104 KCF/KAK MILL aBP& AJSH TO BTM 4" MLLB:> aBP PONT Iv'CINTYRE UNrr WELL: P2-04 PffiMT r--.b: 1981560 AA r--.b: 50-029-22907-00 SEe 11, T12N, R14E, 275.47' FB.. & 4353.61' FNL BP Exploration (Alaska) Well compliance Report File on Left side of folder 198-156-0 POINT MCINTYRE Roll #1: Start: Stop Roll #2: MD 13000 TYD 08953 Completion Date: P2-04 50- 029-22907-00 Start Stop 9/6/98 Completed Status: 1-OIL BP EXPLORATION (AL^sRA) rNC Current: Name D 9104 D 9109 D GR/CCL L DGR/CNP/SLD-MD L DGR/CNP/SLD-TVD L DGR/EWR4-MD L DGR/EWR4-MD L DGR/EWR4-TVD L DGR/EWR4-TVD R SRVY RPT R SRVY RPT R SRVY RPT R SRVY RPT Daily Well Ops _ -- --- Was the well cored? yes no C_°°mmlnts: Interval 2-7 SPERRY MPT/GR/EWR4/CNP/SLD OH 2-4 SPERRY MPT/GR/EWR4/CNP/SLD PB OH FINAL 11515-12966 CH FINAL 5250-13225 OH FINAL 4965-9145 OH FINAL 5250-13225 OH FINAL 5250-13000 OH FINAL 4965-9145 OH FINAL 4965-8953 OH SPERRY 10688.70-13000. OH SPERRY 0-13225. PB1 OH SPERRY 10688.70-13000. OH SPERRY 0-13225. PB1 OH Sent Received T/C/D 3/16/99 3/16/99 3/15/99 3/15/99 1/29/99 1/29/99 CUL 3/11/99 3/11/99 3/11/99 3/11/99 3/11/99 3/11/99 3/23/99 3/23/99 3/11/99 3/11/99 3/23/99 3/23/99 10/12/98 10/14/98 10/12/98 10/14/98 10/13/98 10/14/98 10/13/98 10/14/98 Are Dry Ditch Samples Required? And Received? yes no Analysis Description Received? ye n~ Sample Set # Wednesday, November 08, 2000 Page 1 of 1 STATE OF ALASKA .... . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ Pull tubing _ Alter casing _ Repair well _ Other_X (Frac) 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 5236' FNL, 4263' FEL, Sec. 11, T12N, R14E, UM At top of productive interval 305' FSL, 1061' FWL, Sec. 02, T12N, R14E, UM At effective depth At total depth 4354' FNL, 275' FEL, Sec. 3, T12N, R14E, UM 5. Type of Well: Development X Explorato~__ Stratigraphic__ Service__ (asp's 681252, 5998617) (asp's 681153, 6004163) (asp's 679802, 6004748) 6. Datum elevation (DF or KB feet) RKB 50 feet 7. Unit or Property name Point Mclntyre Unit 8. Well number P2-04 9. Permit number / approval number 198-156 10. APl number 50-029-22907- ~,.~ 11. Field / Pool Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 129' Surface 5201' Intermediate 11388' Liner 1811' 13000 feet Plugs (measured) 8953 feet 11620 feet Junk (measured) 8929 feet Tagged CIBP @ 11620' MD (12/06/99) Size Cemented Measured Depth True vertical Depth 20" Ddven 129' 129' 9-5/8" 1531 Sx Coldset III &391 Sx G 5239' 4956' 7" 200 Sx C~ass G 11438' 8924' 4-1/2" 217 Sx C~ass G 13000' 8953' Perforation depth: measured 11460'-11592'; 11636'-11768'; 11812'-11944'; 11988'-12120'; 12164'-12296'; 12340'-12406'; 12626'-12758'; 12802'-12912'. ~- true vertical8927'-8930'; 8929'-8932'; 8935'-8940'; 8942'-8950'; 8950'-8950'; 8950'-8950'; Tubing (size, grade, and measured depth) 8953'-8952'; 895~ -8953'. 4-1/2"12.6#, 13CR Tbg @ 11216, MD. ;)ackers & SSSV (type & measured depth) 7" X 4-1/2" Baker S-3 PERM PKR @ 11162' MD. 4-1/2" CAMCO BAL-O @ 2018' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. OiI-Bbl Prior to well operation (shut in) Subsequent to operation 1900 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl 1500 280 Casing Pressure Tubing Pressure 79O 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations ._X 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~..~ ~ ~,_¢~. Title ARCO Engineering Supervisor Erin Oba ' Date Prepared by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE P2-04 DESCRIPTION OF WORK COMPLETED HYDRAULIC FRACTURE TREATMENT Date Event Summary 11/23/1999: 11/2 $/1999: 11/29/1999: 9/28/1999: 12/03/1999: 12/06/1999: Drifted to 10800' SLM (HAW). RIH & ran memory GR-CCL f/12952' to 10500' MD. set ClBP @ 11620' MD to isolate the perforation intervals listed below: 11636' - 11768' M D 11812' - 11944' MD 11988' - 12120' MD 12164'- 12296' MD 12340' - 12406' M D 12626' - 12758' MD 12802' - 12912' MD RIH & DGLV's. MITIA to 3000 psi - passed. Set 4-1/2" Frac Sleeve @ SSSV nipple. MITIA to 3000 psi- passed. MIRU & PT'd equipment to 9500 psi. Performed a FB Hydraulic Fracture Treatment using 16/20 mesh ceramic proppant through the open perforation intervals listed below: 11460' - 11592' MD Pumped: (a) 209 bbls Pre-Pad @ 30 bpm, followed by shutdown. FG= 0.71 psi. (b) Shutdown. ISlP @ 2418 psi. Resumed pumping Datafrac Treatment: (c) 50 bbls 40# Crosslinked Gel @ 20 bpm, followed by (d) 174 bbls 20# Linear Gel Flush @ 5-20 bpm, followed by (e) Shutdown. Closure press = 2367 psi. Resumed pumping Frac Treatment: (f) 35 bbls 40# Crosslinked Pad @ 25 bpm, followed by (g) 210 bbls Crosslinked Slurry @ 25 bpm w/proppant stages @ 2-10 ppg (h) Well screened out 7 bbls short of flush. (i) Shutdown. Placed a total of 29698 lbs of proppant into FM. This was 105% of the design amount. Max proppant concentration placed was 9.3 ppg. This well was treated at an avg surface press of 3500 psi @ 25 bpm. RD. RIH & pulled Frac Sleeve. RIH & FCO'd to CIBP @ 11620' MD. Swapped Tbg to Crude. Returned well to production & obtained valid welltest data. R CEtVED AlaslJa 011 & ~ Cons. Comm~lon Anchorage oActive Diagnostic Services, Inc. To~ ARCO Alaska, Inc. AOGCC Lori Taylor 3010 Porcupine Drive Anchorage, Alaska 99501 RE ' Distribution- Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Robert Richey PDS, Inc. Mail Pouch 340112 I:ruclhoe Bay, Al( 99734 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM REM BLUE LINE Open Hole I I 1 Res. Eval. CH I I 1 P2-04 Mech. CH 1 Caliper Survey I Signed · Print Name: ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 Phone:(907)659-2307 Fax:(907)659-2314 E-mail: pdspmdhoe~NAS00.net Website: ww~v.memorylog.com C:LMy Documents~Excel_Word_Documents~Distribution_Forms~%rco_ptmac_form.doc STATE OF ALASKA ALASK,~ '_ AND GAS CONSERVATION COMMI£.. N REPOR't- -,. F SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate ~. Plugging __ Pull tubing __ Alter casing __ Repair well __ Perforate -- Other __ 2, Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 Location of well at surface 5235' FNL, 4262' FEL, Sec. 11, T12N, R14E At top of production interval 305' FSL, 1061' FWL, Sec. 2, T12N, R14E At effective depth At total depth 4395' FNL, 613' FEL, Sec. 3, T12N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service Datum elevation (DF or KB) KB 50 feet 7. unit or Property name POINT MCINTYRE UNIT 8. Well number P2-04 9. Permit number/approval number 98-156 / 10. APl number 500292290770 11. Field/Pool Point Mclntyre 12. Present well condition summary , Total Depth: measurea: true vertical: Effective Depth: measured: true vertical: Casing Length Conductor 88' Surface 5201' Intermediate Liner Perforation depth: 11438' 1777' measured 13000 feet Plugs (measured) 8903 feet 12950 feet Junk (measured) 8953 feet Size Cemented 20" Driven 9 5/8" 1531 sx Coldset III & 391 sx 'G' 7" 200 sx Class 'G' 4 1/2" 217 sx Class 'G' None. None. Measured depth 129' 5239' 11438' 13000' 11460-11592', 11636-11768', 11812-11944', 11988-12120', 12164-12296', 12340-12406', true vertical True vertical depth 129' 4956' 8924' 8953' 8876-8879',8878-8882',8884-8890',8892-8899',8899-8899',8899-8900',8903-8902', Tubing (size, grade, and measured depth) 4 1/2 in. 12.6# 13CR @ 0-11216' MD, Packers and SSSV (type and measured depth) 37/8X6 PKR @ 11162' MD, 3 4/5 x 4 1/2 SVLN @ 2018' MD 3. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Please refer to attached. 14. OiI-Bbl Gas-Mcf Prior to well operation 0 0 Subsequent to operation 0 0 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Representative Daily Average Production or Iniection Data Water-Bbl 16. CasingPressure TubingPressure 0 1275 1375 0 1250 1350 Status of well classification as: Oil x_~ Gas __Suspended Service 17. I hereby certify._tl~t the foregoing js true and correct to the best of my knowledge. Signed ~ ; Title ~/'t/' Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE P2-04 DESCRIPTION OF WORK COMPLETED HIGH PRESSURE BREAKDOWN TREATMENT Date Event Summary 05-13-1999 High Pressure Breakdown Treatment to stimulate perfs performed. Well PT'd to 8500 psi, then the following was pumped: a) 1964 bbls Slick Seawater at 20 bpm b) 3000 7/8" Bioballs at 40+ balls per minute c) 2750# Wax Beads d) 50 bbls Diesel / Xylene post flush e) 200 bbls hot Crude f) 20 bbls Diesel Avg water temp =.80 deg F. Max treating pressure 4500 psi at 20 bpm; avg treating pressure 3625 psi. Well' P2-04 GPMA WEB Date' 6/2/99 0775 - 11162 11163 11164 -- 11195 11202 11203 11206- 1215 1222 1500- 1700- -- -- 1900- -- -- -- __ 2200- -- -- 12700- SVLN -- PKR -- NIP -- NIP -- TT-- Perf ~ Perf -- Perf ------~ Perf Peff ~ Perf - Perf - Perf - APl: 500292290700 SSSV Type: CAT I Annular Fluid: SEAWATER W DIESEL F/P Reference Log: Last Tag: 920' SLM (hydrates) Last Tag Date: 5/23/99 Well Type: PROD Orig Compltn: 9/6/98 Last W/O: Angle @ TS: deg @ Angle @ TD: 90 deg @ 1300 Rev Reason: Tagged hydrate Ref Log Date: Last Update: 5/24/99 TD: 13500 ftKB Max Hole 93 deg @ 11580 Angle: Date Note 914198 MINIMUM ID: 3.725" HES XN NIPPLE at 11205' Depth TVD Type 2018 2013 SVLN 11162 8876 PKR 11195 8881 NIP 11205 8883 NIP Description 4.5" CAMCO BAL-O (DUMMY PULLED 9/11/98) BAKER 7" x 4.5" S-3 PERM PKR HES X NIPPLE HES XN NIPPLE Size Weight Grade Top Btm Feet Description 9.630 40.00 L-80 38 5239 5201 SURFACE 7.000 29.00 L80 0 11438 11438 PRODUCTION 6.180 12.60 13CR 11202 11223 21 LINER HGR ASSY 4.500 12.60 13CR 11223 13000 1777 LINER Size Weight Grade Top Btm Feet Description 4,500 12.60 13CR 0 11216 11216 Tubing relSNalVeS stn MD TVD Man Man VMfr VType Mfr Type I 4185 4066 CAMCO KGB-2-LS CAMCO LV 2 5302 5010 CAMCO KGB-2-LS CAMCO DV 3 6668 6017 CAMCO KGB-2-LS CAMCO DY 4 7823 6808 CAMCO KGB-2-LS CAMCO LV 5 9101 7710 CAMCO KGB-2-LS CAMCO DV 6 9968 8309 CAMCO KGB-2-LS CAMCO OV 7 10771 8761 CAMCO KGB-2-LS CAMCO DY V OD Latch Port TRO Date Run 1.0 BTM 0.250 2513 5/16/99 INT 1.0 BTM 0.000 0 9/4/98 INT 1.0 BTM 0.000 0 9/4/98 INT 1.0 BTM 0.250 2515 5/16/99 INT 1.0 BTM 0.000 0 9/4/98 INT 1.0 BTM 0.375 0 5/16/99 INT 1.0 BTM 0.000 0 5/8/99 INT Vlv Comme Interval TVD Zone Status FeetSPF Date Type 11460- 8927-8930 O 132 11592 11636- 8929-8932 O 132 11768 11812- 8935-8940 O 132 11944 11988- 8942-8950 O 132 12120 12164- 8950-8950 O 132 12296 12340- 8950-8950 O 66 12406 12626- 8953-8952 O 132 12758 12802- 8952-8953 O 110 12912 Comment 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP 4 9/3/98 IPERF TCP, 2 3/4" SCALLOP WELL LOG TRANSMITTAL To: State of Alaska March 23, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs P2-04, AK-MM-80331 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-04 : 2"x 5" MD Resistivity & Craxrana Ray Logs: 50-029-22907-00 2"x 5" TVD Resistivity & Cranuna Ray Logs: 50-029-22907-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 F:! I I--I_11M G WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 March 16, 1999 RE: MWD Formation Evaluation Logs P2-04 PB 1, AK-MM-80331 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-04 PB1: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-029-22907-70 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22907-70 2"x 5"MD Neutron & Density Logs: 50-029-22907-70 2"x 5"MD Neutron & Density Logs: 50-029-22907-70 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia RECEIVED' Ala~ 0il & Gas Cons. O0mmi~ion 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 I=11 I__111~ G WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P2-04, March 16, 1999 AK-MM-80331 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22907-00 REC' 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 F11 I_1--11~ G S E I::1 ~./I ~-- E S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P2-04 PB 1, March 16, 1999 AK-MM-80331 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention ot~ Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22907-70 Note: This Data replaces the Data previously sent on Disc for well ( P244 PB1 ). Previous Disc labeled P2-04 PB1 should be destroyed per request of Dede Schwartz. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company FYI 07:55 AM aARCO Alaska, Inc. Forwarded by Deirdre L Schwartz/AAI/ARCO on 03/15/99 W Dallam Masterson 03/13/99 10:21 AM To: Deirdre L Schwartz/AAI/ARCO@ARCO cc: Subject: Re: P2-04PB1 (Document link not converted) I'd feel better about it if Sperry went to the AOGCC and collected the disk to return to us to destroy, rather than relying on someone else. Deirdre L Schwartz 03/12/99 02:21 PM To: Laura S Lahrson/AAI/ARCO@ARCO cc: Sharon Allsup-Drake/AAI/ARCO@ARCO, W Dallam Masterson/AAI/ARCO@ARCO Subject: P2-04PB1 Laura, You will be getting a disk and/or a printout labeled P2-04PB1. It is not P2-04PB1, it is Meltwater South 1 data written to the disk by r~istake. Please let me know when you get it and I'll Come get the data. I immediately informed Sperry of the mistake and the only other erroneous disk went to the AOGCC. Sperry will contact them and request the disk be destroyed. Dede RECEIVED .,,"-.~a~ 1,5 1999 AJaska Oil & (Sas Cons. Commi STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [~ Oil [-] Gas [--~ Suspended [--I Abandoned [~] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 98-156 3. Address ........ 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-661i2 .: :: ;..r. :"~'.' _ 50--029--22907 4. Location of well at surface '¢ ~-~,/~,. i~_~__~.j '~'~,~,r~.~,~ 9. Unit or Lease Name 41' NSL, 1018' EWL, SEC. 11, T12N, R14E, UM ' ~ Point Mclntyre At top of productive interval :i '~r"~'"' .... 10. Well Number -~ ... P2-04 At total depth ! 11. Field and Pool 925' NSL, 282' WEL, SEC. 3, T12N, R14E, UM Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 50.0'I ADL034622 12. Da{e ~pudded8/9/98 1131 Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if OffshOre I 16' NO' Of cOmpletiOns9/1/98 9/6/98 N/A MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 13000 8953 FT 12953 8953 FTI [~Yes I--]NoI 2018' MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, GR/RES 23. CASlNG~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 41' 129' 30" Driven 9-5/8" 40# L-80 38' 5239' 12-1/4" 1531 sx Coldset III, 391 sx 'G' 7" 26#/29# L-80/13CR 36' 11438' 8-3/4" 200 sx Class 'G' '4-1/2" 12.6# 13CR 11189' 13000' 6" 217 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" gun diameter, 4 spf 4-1/2", 12.6#, 13CR 11218' 11162' MD TVD MD TVD 11460' -11592' 8927' - 8930' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11636' -11768' 8929' -8932' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11812' -11944' 8935' -8940' 11988'-12120' 8942'-8900' 13220' -11320' Abandonment plug, 153 bbls 'G' 12164' - 12296' 8900' -8941' 10986' - 10686' Kick off plug, 29 bbls 'G' 12340' -12406' 8950' -8950' 12626' -12758' 8953' -8952' 12802' -12912' 8952' -8953' 27. PRODUCTION TEST~ D I ~1 i~t A I Date First Production I Method of Operation (Flowing, gas lift, etc.)~J i \ I U I I ~/-~ L,, September 14, 1998 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. REC[iVED OC..T 4. ,~aska Oii & Gas Cons. Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top Kalubik 11216' 8885' Base Kalubik 11415' 8920' 31. List of Attachments Summary of Daily Drilling Reports, Survey 32. I hereby certify that the f~egoing is true, and correct to the best of my knowledge Si~l~ Lowell Crane ,~~'/~'J/' '~~/~~"' Drilling Engineering Supervisor Date / P2-04 L./ 98-156 Prepared By Name/Number: Carol Withey, 564-4114 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM §: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27': Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ~nch0rage Facility Date/Time 09 Aug 98 10 Aug 98 11 Aug 98 12 Aug 98 13 Aug 98 14 Aug 98 Pt Mac 2 Progress Report Well P2-04 Rig Nabors 33E Page Date 06:00-09:30 09:30-15:00 15:00-17:30 17:30-18:30 18:30-19:30 19:30-20:00 20:00-22:00 22:00-22:30 22:30-00:30 00:30-06:00 06:00-06:00 06:00-02:30 02:30-03:30 03:30-06:00 06:00-09:30 09:30-13:00 13:00-14:30 14:30-16:30 16:30-20:00 20:00-23:00 23:00-23:30 23:30-05:45 05:45-06:00 06:00-09:00 09:00-09:30 09:30-09:45 09:45-10:30 10:30-11:00 11:00-11:30 11:30-13:30 13:30-14:00 14:00-14:45 14:45-15:00 15:00-18:00 18:00-19:00 19:00-21:00 21:00-22:30 22:30-23:30 23:30-06:00 06:00-08:00 08:00-08:15 08:15-12:30 12:30-12:45 12:45-13:00 13:00-13:30 13:30-14:30 14:30-15:30 15:30-18:30 18:30-19:15 19:15-19:30 19:30-20:30 20:30-21:30 21:30-22:30 22:30-23:00 Duration 3-1/2 hr 5-1/2 hr 2-1/2 hr 1 hr 1 hr 1/2 hr 2 hr 1/2 hr 2hr 5-1/2 hr 24 hr 20-1/2 hr 1 hr 2-1/2 hr 3-1/2 hr 3-1/2 hr 1-1/2 hr 2hr 3-1/2 hr 3 hr 1/2 hr 6-1/4 hr 1/4 hr 3 hr 1/2 hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 2 hr 1/2 hr 3/4 hr 1/4 hr 3hr lhr 2 hr 1-1/2 hr 1 hr 6-1/2 hr 2 hr 1/4 hr 4-1/4 hr 1/4 hr 1/4 hr 1/2 hr 1 hr 1 hr 3 hr 3/4 hr 1/4 hr 1 hr 1 hr lhr 1/2 hr Activity Rigged up Fluid system Rigged up Bell nipple Made up BHA no. 1 Circulated at 129.0 ft Serviced Drillfloor / Derrick Held safety meeting Drilled to 250.0 ft Pulled out of hole to 40.0 ft Made up BHA no. 1 Drilled to 910.0 ft Drilled to 3264.0 ft (cont...) Drilled to 5250.0 ft (cont...) Circulated at 5250.0 ft Pulled out of hole to 2460.0 ft Pulled out of hole to 1200.0 ft (cont...) R.I.H. to 5250.0 ft Circulated at 5250.0 ft Pulled out of hole to 1200.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 5250.0 ft (9-5/8in OD) Circulated at 5250.0 ft Circulated at 5250.0 ft (cont...) Held safety meeting Pumped Water spacers - volume 50.000 bbl Mixed and pumped slurry - 180.000 bbl Mixed and pumped slurry - 77.000 bbl Displaced slurry - 390.000 bbl Circulated at 2029.0 ft Pumped Water spacers - volume 40.000 bbl Mixed and pumped slurry - 330.000 bbl Displaced slurry - 153.000 bbl Rigged down Cement head Cleared Shaker discharge line Rigged down Casing handling equipment Rigged down Bell nipple Installed Tubing head spool Installed BOP stack Installed BOP stack (cont...) Installed BOP test plug assembly Tested Well control Retrieved BOP test plug assembly Installed Bore protector Rigged down High pressure lines Serviced Bell nipple Serviced Top drive Made up BHA no. 2 R.I.H. to 2029.0 ft Drilled installed equipment - Cementing packer R.I.H. to 5152.0 ft Circulated at 5152.0 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) 1 29 September 98 Facility Date/Time 15 Aug 98 16 Aug 98 17 Aug 98 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 22 Aug 98 23 Aug 98 Pt Mac 2 Progress Report Well P2-04 Rig Nabors 33E Page Date 23:00-01:00 01:00-02:00 02:00-02:15 02:15-04:00 04:00-06:00 06:00-06:00 06:00-12:00 12:00-13:00 13:00-17:30 17:30-18:00 18:00-19:30 19:30-06:00 06:00-16:30 16:30-18:30 18:30-23:00 23:00-01:00 01:00-06:00 06:00-08:30 08:30-09:30 09:30-11:30 11:30-13:00 13:00-14:30 14:30-18:00 18:00-19:00 19:00-20:00 20:00-04:30 04:30-06:00 06:00-07:00 07:00-11:30 11:30-13:30 13:30-14:30 14:30-18:00 18:00-19:30 19:30-06:00 06:00-06:00 06:00-06:00 06:00-09:30 09:30-11:30 11:30-13:30 13:30-16:00 16:00-20:30 20:30-23:30 23:30-00:30 00:30-01:30 01:30-04:00 04:00-06:00 06:00-07:00 07:00-07:15 07:15-07:45 07:45-08:00 08:00-09:30 09:30-11:00 11:00-11:10 11:10-11:20 Duration 2 hr lhr 1/4 hr 1-3/4 hr 2 hr 24 hr 6hr 1 hr 4-1/2 hr 1/2 hr 1-1/2 hr 10-1/2 hr 10-1/2 hr 2hr 4-1/2 hr 2 hr 5 hr 2-1/2 hr lhr 2 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1 hr lhr 8-1/2 hr 1-1/2 hr 1 hr 4-1/2 hr 2 hr 1 hr 3-1/2 hr 1-1/2 hr 10-1/2 hr 24 hr 24 hr 3-1/2 hr 2hr 2hr 2-1/2 hr 4-1/2 hr 3hr 1 hr 1 hr 2-1/2 hr 2 hr lhr 1/4 hr 1/2 hr 1/4 hr 1-1/2 hr 1-1/2 hr 0 hr 0 hr Activity Serviced Block line Drilled cement to 5239.0 ft Drilled to 5274.0 ft Performed formation integrity test Drilled to 5500.0 ft Drilled to 8583.0 ft (cont...) Drilled to 9861.0 ft (cont...) Circulated at 8961.0 ft Pulled out of hole to 7023.0 ft Repaired Internal BOPs R.I.H. to 8961.0 ft Drilled to 9906.0 ft Drilled to 10472.0 ft (cont...) Circulated at 10472.0 ft Pulled out of hole to 642.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 5239.0 ft Serviced Top drive R.I.H. to 10472.0 ft Circulated at 10472.0 ft Circulated at 10472.0 ft Drilled to 10655.0 ft Jarred stuck pipe at 10630.0 ft Circulated at 10655.0 ft Drilled to 10923.0 ft Circulated at 10923.0 ft Circulated at 10923.0 ft (cont...) Pulled out of hole to 1107.0 ft Pulled BHA Made up BHA no. 4 R.I.H. to 10923.0 ft Circulated at 10923.0 ft Drilled to 11224.0 ft Drilled to 12074.0 ft (cont...) Drilled to 13240.0 ft (cont...) Circulated at 13225.0 ft Pulled out of hole to 9522.0 ft R.I.H. to 13225.0 ft Circulated at 13225.0 ft Pulled out of hole to 1107.0 ft Pulled BHA Ran Drillpipe in stands to 5200.0 ft Serviced Block line Ran Drillpipe in stands to 13220.0 ft Circulated at 13220.0 ft Circulated at 13220.0 ft (cont...) Pumped Water spacers - volume 20.000 bbl Mixed and pumped slurry - 153.000 bbl Displaced slurry - 177.000 bbl Pulled Drillpipe in stands to 10986.0 ft Circulated at 10986.0 ft Pumped Water spacers - volume 20.000 bbl Batch mixed slurry - 29.000 bbl 2 29 September 98 Facility Date/Time 24 Aug 98 25 Aug 98 26 Aug 98 27 Aug 98 28 Aug 98 29 Aug 98 Progress Report Pt Mac 2 Well P2-04 Page 3 Rig Nabors 33E Date 29 September 98 11:20-11:30 11:30-12:00 12:00-13:30 13:30-15:00 15:00-00:00 00:00-01:00 01:00-01:30 01:30-03:30 03:30-04:00 04:00-06:00 06:00-07:00 07:00-09:00 09:00-10:00 10:00-11:00 11:00-14:00 14:00-15:30 15:30-06:00 06:00-06:00 06:00-09:00 09:00-11:00 11:00-12:30 12:30-13:00 13:00-16:00 16:00-17:00 17:00-21:30 21:30-22:00 22:00-23:00 23:00-00:00 00:00-01:30 01:30-03:00 03:00-04:30 04:30-05:00 05:00-06:00 06:00-16:00 16:00-19:00 19:00-19:15 19:15-19:30 19:30-21:00 21:00-21:30 21:30-22:00 22:00-23:00 23:00-00:00 00:00-01:00 01:00-04:00 04:00-06:00 06:00-18:00 18:00-18:30 18:30-19:30 19:30-21:00 21:00-22:00 22:00-23:00 23:00-23:30 23:30-06:00 06:00-06:00 Duration 0hr 1/2 hr 1-1/2 hr 1-1/2 hr 9hr 1 hr 1/2 hr 2 hr 1/2 hr 2hr 1 hr 2hr lhr 1 hr 3 hr 1-1/2 hr 14-1/2 hr 24 hr 3 hr 2 hr 1-1/2 hr 1/2 hr 3hr lhr 4-1/2 hr 1/2 hr 1 hr lhr 1-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr lhr 10hr 3 hr 1/4 hr 1/4hr 1-1/2 hr 1/2 hr 1/2 hr 1 hr 1 hr 1 hr 3 hr 2 hr 12hr 1/2 hr lhr 1-1/2 hr 1 hr lhr 1/2 hr 6-1/2 hr 24 hr Activity Displaced slurry - 173.000 bbl Pulled Drillpipe in stands to 10050.0 ft Circulated at 10050.0 ft Pulled Drillpipe in stands to 5200.0 fi Wait on cement Pulled Drillpipe in stands to 0.0 ft Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 5 Made up BHA no. 5 (cont...) R.I.H. to 5200.0 ft Circulated at 5200.0 ft Serviced Top drive R.I.H. to 10686.0 ft Drilled cement to 10780.0 ft Drilled to 10805.0 ft Drilled to 11350.0 ft (cont...) Drilled to 11452.0 fi (cont...) Circulated at 11452.0 fi Pulled out of hole to 9035.0 ft R.I.H. to 11452.0 ft Circulated at 11452.0 ft Pulled out of hole to 9800.0 ft Laid down 5000.0 fi of 5in OD drill pipe Serviced Draw works Repaired Drillstring handling equipment Laid down 3000.0 ft of 5in OD drill pipe Pulled BHA Tested Top ram Rigged up Casing handling equipment Held safety meeting Ran Casing to 7in (480.0 ft OD) Ran Casing to 11438.0 ft (7in OD) (cont...) Circulated at 11438.0 fi Pumped Synthetic based mud spacers - volume 50.000 bbl Mixed and pumped slurry - 42.000 bbl Displaced slurry - 435.000 bbl Removed Casing handling equipment Installed Seal assembly Rigged up Top ram Tested Top ram Rigged up Drillstring handling equipment Made up BHA no. 6 Singled in drill pipe to 1500.0 ft Singled in drill pipe to 11323.0 fi (cont...) Circulated at 11323.0 ft Tested Casing Drilled installed equipment - Float shoe Drilled to 11472.0 ft Circulated at 11472.0 ft Performed formation integrity test Drilled to 11605.0 ft Drilled to 11898.0 ft (cont...) Facility Date/Time 30 Aug 98 31 Aug 98 01 Sep 98 02 Sep 98 03 Sep 98 04 Sep 98 Pt Mac 2 Progress Report Well P2-04 Rig Nabors 33E Page Date 06:00-07:00 07:00-11:00 11:00-12:00 12:00-12:30 12:30-13:30 13:30-15:00 15:00-17:30 17:30-18:00 18:00-19:30 19:30-00:00 00:00-06:00 06:00-06:00 06:00-11:30 11:30-13:00 13:00-14:00 14:00-15:00 15:00-16:30 16:30-21:30 21:30~23:00 23:00-23:30 23:30-23:45 23:45-06:00 06:00-12:00 12:00-13:30 13:30-14:30 14:30-16:30 16:30-17:00 17:00-17:15 17:15-17:30 17:30-18:00 18:00-18:15 18:15-19:30 19:30-21:00 21:00-22:00 22:00-23:00 23:00-05:00 05:00-05:30 05:30-06:00 06:00-06:30 06:30-10:30 10:30-15:30 15:30-16:00 16:00-16:15 16:15-16:30 16:30-17:00 17:00-17:30 17:30-19:00 19:00-20:00 20:00-20:15 20:15-20:30 20:30-00:00 00:00-04:30 04:30-04:45 04:45-05:00 Duration lhr 4 hr 1 hr 1/2 hr 1 hr 1-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 4-1/2 hr 6hr 24 hr 5-1/2 hr 1-1/2 hr lhr lhr 1-1/2 hr 5 hr 1-1/2 hr 1/2 hr 1/4 hr 6-1/4 hr 6hr 1-1/2 hr 1 hr 2hr 1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 1-1/4 hr 1-1/2 hr 1 hr lhr 6hr 1/2 hr 1/2 hr 1/2 hr 4 hr 5 hr 1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 1/4 hr 1/4 hr 3-1/2 hr 4-1/2 hr 1/4 hr 1/4 hr Activity Circulated at 11898.0 ft Pulled out of hole to 197.0 ft Pulled BHA Retrieved Wear bushing Tested Top drive Serviced Block line Tested BOP stack Installed Wear bushing Made up BHA no. 7 R.I.H. to 11898.0 ft Drilled to 11994.0 ft Drilled to 12725.0 ft (cont...) Drilled to 13000.0 ft (cont...) Circulated at 13000.0 ft Pulled out of hole to 11430.0 ft R.I.H. to 13000.0 ft Circulated at 13000.0 ft Pulled out of hole to 198.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Liner to 1771.0 ft (4-1/2in OD) Ran Drillpipe on landing string to 11400.0 ft Circulated at 11400.0 ft Ran Drillpipe on landing string to 13000.0 ft Circulated at 13000.0 ft Held safety meeting Pumped Brine spacers - volume 70.000 bbl Mixed and pumped slurry - 46.000 bbl Displaced slurry - 121.000 bbl Functioned Liner hanger Circulated at 12940.0 ft Serviced Trip tank Pulled Drillpipe in stands to 11200.0 ft Tested Liner - Via annulus and string Pulled Drillpipe in stands to 0.0 ft Serviced Drillfloor / Derrick Rigged up Drillstring handling equipment Held safety meeting Installed Gun assembly Ran Drillpipe to 12912.0 ft (4in OD) Held safety meeting Set packer at 11061.0 ft with 0.0 psi Tested High pressure lines Perforated Functioned Retrievable packer Reverse circulated at 11050.0 ft Pulled Drillpipe in stands to 11200.0 ft Flow check Serviced Drillstring handling equipment Pulled Drillpipe in stands to 1452.0 ft Retrieved Gun assembly Retrieved B ore protector Installed BOP test plug assembly 4 29 September 98 Facility Date/Time 05 Sep 98 06 Sep 98 Progress Report Pt Mac 2 Well P2-04 Page 5 Rig Nabors 33E Date 29 September 98 05:00-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-21:30 21:30-22:00 22:00-01:30 01:30-02:00 02:00-06:00 06:00-07:00 07:00-08:00 08:00-08:30 08:30-09:30 09:30-12:00 12:00-14:00 14:00-17:00 17:00-17:30 17:30-20:30 20:30-21:00 21:00-23:00 23:00-00:00 00:00-01:00 01:00-02:00 02:00-03:00 03:00-03:30 03:30-04:00 04:00-04:15 04:15-06:00 06:00-08:00 08:00-08:30 08:30-09:30 09:30-09:45 09:45-10:30 10:30-11:00 11:00-11:15 11:15-11:30 11:30-12:30 Duration 1/2 hr 1/2 hr 1/2 hr 2 hr 13hr 1/2 hr 3-1/2 hr 1/2 hr 4 hr 1 hr 1 hr 1/2 hr lhr 2-1/2 hr 2 hr 3 hr 1/2 hr 3 hr 1/2 hr 2hr 1 hr 1 hr 1 hr lhr 1/2 hr 1/2 hr 1/4 hr 1-3/4 hr 2hr 1/2 hr 1 hr 1/4 hr 3/4 hr 1/2 hr 1/4 hr 1/4 hr 1 hr Activity Serviced Drillfloor / Derrick Worked on BOP - Top ram Tested Top ram Rigged up Completion string handling equipment Ran Tubing to 7250.0 ft (4-1/2in OD) Serviced Handling equipment Ran Tubing to 9250.0 ft (4-1/2in OD) Installed SCSSSV nipple assembly Ran Tubing to 4-1/2in (11100.0 ft OD) Ran Tubing to 11100.0 ft (4-1/2in OD) (cont...) Installed Tubing hanger Stung into Liner hanger Reverse circulated at 11217.0 ft Packer worked at 11161.0 ft Conducted slickline operations on Slickline equipment - Retrival run Rigged up sub-surface equipment - Completion string sub-assemblies Conducted slickline operations on Slickline equipment - Retrival run Conducted slickline operations on Slickline equipment - Tool run Test Lubricator unit Conducted slickline operations on Slickline equipment - Tool run Conducted slickline operations on Slickline equipment - Setting run Rigged down Slickline unit Tested Permanent packer - Via string Tested Permanent packer - Via annulus Functioned Side pocket valve Installed Hanger plug Tested Hanger plug Removed BOP stack Removed BOP stack (cont...) Installed Tubing bonnet Installed Xmas tree Tested Tubing bonnet Tested Xmas tree Tested Accessories Removed Hanger plug Installed Hanger plug Rigged down Drillfloor / Derrick Facility Date/Time 09 Aug 98 10 Aug 98 11 Aug 98 12 Aug 98 13 Aug 98 14 Aug 98 Pt Mac 2 Progress Report Well P2-04PB 1 Rig Nabors 33E Duration Activity 06:00-09:30 09:30-15:00 15:00-17:30 17:30-18:30 18:30-19:30 19:30-20:00 20:00-22:00 22:00-22:30 22:30-00:30 00:30-06:00 06:00-06:00 06:00-02:30 02:30-03:30 03:30-06:00 06:00-09:30 09:30-13:00 13:00-14:30 14:30-16:30 16:30-20:00 20:00-23:00 23:00-23:30 23:30-05:45 05:45-06:00 06:00-09:00 09:00-09:30 09:30-09:45 09:45-10:30 10:30-11:00 11:00-11:30 11:30-13:30 13:30-14:00 14:00-14:45 14:45-15:00 15:00-18:00 18:00-19:00 19:00-21:00 21:00-22:30 22:30-23:30 23:30-06:00 06:00-08:00 08:00-08:15 08:15-12:30 12:30-12:45 12:45-13:00 13:00-13:30 13:30-14:30 14:30-15:30 15:30-18:30 18:30-19:15 19:15-19:30 19:30-20:30 20:30-21:30 21:30-22:30 22:30-23:00 3-1/2 hr 5-1/2 hr 2-1/2 hr 1 hr 1 hr 1/2 hr 2hr 1/2 hr 2hr 5-1/2 hr 24 hr 20-1/2 hr lhr 2-1/2 hr 3-1/2 hr 3-1/2 hr 1-1/2 hr 2hr 3-1/2 hr 3hr 1/2 hr 6-1/4 hr 1/4 hr 3 hr 1/2 hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 2hr 1/2 hr 3/4 hr 1/4 hr 3hr 1 hr 2 hr 1-1/2 hr 1 hr 6-1/2 hr 2hr 1/4 hr 4-1/4 hr 1/4 hr 1/4 hr 1/2 hr lhr lhr 3hr 3/4 hr 1/4 hr 1 hr 1 hr 1 hr 1/2 hr Rigged up Fluid system Rigged up Bell nipple Made up BI-IA no. 1 Circulated at 129.0 ft Serviced Drillfloor / Derrick Held safety meeting Drilled to 250.0 ft Pulled out of hole to 40.0 ft Made up BI-IA no. 1 Drilled to 910.0 ft Drilled to 3264.0 ft (cont...) Drilled to 5250.0 ft (cont...) Circulated at 5250.0 ft Pulled out of hole to 2460.0 ft Pulled out of hole to 1200.0 ft (cont...) R.I.H. to 5250.0 ft Circulated at 5250.0 ft Pulled out of hole to 1200.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 5250.0 ft (9-5/8in OD) Circulated at 5250.0 ft Circulated at 5250.0 ft (cont...) Held safety meeting Pumped Water spacers - volume 50.000 bbl Mixed and pumped slurry - 180.000 bbl Mixed and pumped slurry - 77.000 bbl Displaced slurry - 390.000 bbl Circulated at 2029.0 ft Pumped Water spacers - volume 40.000 bbl Mixed and pumped slurry - 330.000 bbl Displaced slurry - 153.000 bbl Rigged down Cement head Cleared Shaker discharge line Rigged down Casing handling equipment Rigged down Bell nipple Installed Tubing head spool Installed BOP stack Installed BOP stack (cont...) Installed BOP test plug assembly Tested Well control Retrieved BOP test plug assembly Installed Bore protector Rigged down High pressure lines Serviced Bell nipple Serviced Top drive Made up BHA no. 2 R.I.H. to 2029.0 ft Page Date Drilled installed equipment - Cementing packer R.I.H. to 5152.0 ft Circulated at 5152.0 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) 1 01 October 98 Facility Date/Time 15 Aug 98 16 Aug 98 17 Aug 98 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 22 Aug 98 23 Aug 98 Pt Mac 2 Progress Report Well P2-04PB 1 Rig Nabors 33E 23:00-01:00 01:00-02:00 02:00-02:15 02:15-04:00 04:00-06:00 06:00-06:00 06:00-12:00 12:00-13:00 13:00-17:30 17:30-18:00 18:00-19:30 19:30-06:00 06:00-16:30 16:30-18:30 18:30-23:00 23:00-01:00 01:00-06:00 06:00-08:30 08:30-09:30 09:30-11:30 11:30-13:00 13:00-14:30 14:30-18:00 18:00-19:00 19:00-20:00 20:00-04:30 04:30-06:00 06:00-07:00 07:00-11:30 11:30-13:30 13:30-14:30 14:30-18:00 18:00-19:30 19:30-06:00 06:00~06:00 06:00-06:00 06:00~09:30 09:30-11:30 11:30-13:30 13:30-16:00 16:00-20:30 20:30-23:30 23:30-00:30 00:30-01:30 01:30-04:00 04:00-06:00 06:00-07:00 07:00-07:15 07:15-07:45 07:45-08:00 08:00-09:30 09:30-11:00 11:00-11:10 11:10-11:20 Duration 2hr 1 hr 1/4 hr 1-3/4 hr 2 hr 24 hr 6hr 1 hr 4-1/2 hr 1/2 hr 1-1/2 hr 10-1/2 hr 10-1/2 hr 2hr 4-1/2 hr 2 hr 5hr 2-1/2 hr lhr 2 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1 hr 1 hr 8-1/2 hr 1-1/2 hr 1 hr 4-1/2 hr 2 hr 1 hr 3-1/2 hr 1-1/2 hr 10-1/2 hr 24 hr 24 hr 3-1/2 hr 2 hr 2 hr 2-1/2 hr 4-1/2 hr 3 hr 1 hr 1 hr 2-1/2 hr 2 hr 1 hr 1/4 hr 1/2 hr 1/4 hr 1-1/2 hr 1-1/2 hr 0 hr 0hr Activity Serviced Block line Drilled cement to 5239.0 ft Drilled to 5274.0 ft Performed formation integrity test Drilled to 5500.0 ft Drilled to 8583.0 ft (cont...) Drilled to 9861.0 ft (cont...) Circulated at 8961.0 ft Pulled out of hole to 7023.0 ft Repaired Internal BOPs R.I.H. to 8961.0 ft Drilled to 9906.0 ft Drilled to 10472.0 ft (cont...) Circulated at 10472.0 ft Pulled out of hole to 642.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 5239.0 ft Serviced Top drive R.I.H. to 10472.0 ft Circulated at 10472.0 ft Circulated at 10472.0 fi Drilled to 10655.0 ft Jarred stuck pipe at 10630.0 ft Circulated at 10655.0 fi Drilled to 10923.0 ft Circulated at 10923.0 ft Circulated at 10923.0 fi (cont...) Pulled out of hole to 1107.0 ft Pulled BHA Made up BHA no. 4 R.I.H. to 10923.0 fi Circulated at 10923.0 fi Drilled to 11224.0 ft Drilled to 12074.0 fi (cont...) Drilled to 13240.0 ft (cont...) Circulated at 13225.0 ft Pulled out of hole to 9522.0 ft R.I.H. to 13225.0 ft Circulated at 13225.0 ft Pulled out of hole to 1107.0 ft Pulled BHA Ran Drillpipe in stands to 5200.0 ft Serviced Block line Ran Drillpipe in stands to 13220.0 ft Circulated at 13220.0 ft Circulated at 13220.0 ft (cont...) Pumped Water spacers - volume 20.000 bbl Mixed and pumped slurry - 153.000 bbl Displaced slurry - 177.000 bbl Pulled Drillpipe in stands to 10986.0 ft Circulated at 10986.0 ft Pumped Water spacers - volume 20.000 bbl Batch mixed slurry - 29.000 bbl Page Date 2 01 October 98 Progress Report Facility Pt Mac 2 Well P2-04PB 1 Page 3 Rig Nabors 33E Date 01 October 98 Date/Time 11:20-11:30 11:30-12:00 12:00-13:30 13:30-15:00 15:00-00:00 24 Aug 98 00:00-01:00 01:00-01:30 01:30-03:30 03:30-04:00 04:00-06:00 06:00-07:00 07:00-09:00 09:00-10:00 10:00-11:00 11:00-14:00 14:00-15:30 15:30-06:00 25 Aug 98 06:00-06:00 26 Aug 98 06:00-09:00 09:00-11:00 11:00-12:30 12:30-13:00 13:00-16:00 16:00-17:00 17:00-21:30 21:30-22:00 22:00-23:00 23:00-00:00 27 Aug 98 00:00-01:30 01:30-03:00 03:00-04:30 04:30-05:00 05:00-06:00 06:00-16:00 16:00-19:00 19:00-19:15 19:15-19:30 19:30-21:00 21:00-21:30 21:30-22:00 22:00-23:00 23:00-00:00 28 Aug 98 00:00-01:00 01:00-04:00 04:00-06:00 06:00-18:00 18:00-18:30 18:30-19:30 19:30-21:00 21:00-22:00 22:00-23:00 23:00-23:30 23:30-06:00 29 Aug 98 06:00-06:00 Duration 0 hr 1/2 hr 1-1/2 hr 1-1/2 hr 9 hr lhr 1/2 hr 2 hr 1/2 hr 2 hr lhr 2 hr 1 hr 1 hr 3 hr 1-1/2 hr 14-1/2 hr 24 hr 3hr 2 hr 1-1/2 hr 1/2 hr 3hr lhr 4-1/2 hr 1/2 hr 1 hr 1 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1 hr 10hr 3hr 1/4 hr 1/4 hr 1-1/2 hr 1/2 hr 1/2 hr 1 hr lhr 1 hr 3 hr 2 hr 12hr 1/2 hr 1 hr 1-1/2 hr 1 hr 1 hr 1/2 hr 6-1/2 hr 24 hr Activity Displaced slurry - 173.000 bbl Pulled Drillpipe in stands to 10050.0 ft Circulated at 10050.0 ft Pulled Drillpipe in stands to 5200.0 ft Wait on cement Pulled Drillpipe in stands to 0.0 ft Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 5 Made up BHA no. 5 (cont...) R.I.H. to 5200.0 ft Circulated at 5200.0 ft Serviced Top drive R.I.H. to 10686.0 ft Drilled cement to 10780.0 ft Drilled to 10805.0 ft Drilled to 11350.0 ft (cont...) Drilled to 11452.0 ft (cont...) Circulated at 11452.0 ft Pulled out of hole to 9035.0 ft R.I.H. to 11452.0 ft Circulated at 11452.0 ft Pulled out of hole to 9800.0 ft Laid down 5000.0 ft of 5in OD drill pipe Serviced Draw works Repaired Drillstdng handling equipment Laid down 3000.0 ft of 5in OD drill pipe Pulled BHA Tested Top ram Rigged up Casing handling equipment Held safety meeting Ran Casing to 7in (480.0 ft OD) Ran Casing to 11438.0 ft (7in OD) (cont...) Circulated at 11438.0 ft Pumped Synthetic based mud spacers - volume 50.000 bbl Mixed and pumped slurry - 42.000 bbl Displaced slurry - 435.000 bbl Removed Casing handling equipment Installed Seal assembly Rigged up Top ram Tested Top ram Rigged up Drillstring handling equipment Made up BHA no. 6 Singled in drill pipe to 1500.0 ft Singled in drill pipe to 11323.0 ft (cont...) Circulated at 11323.0 ft Tested Casing Drilled installed equipment - Float shoe Drilled to 11472.0 ft Circulated at 11472.0 ft Performed formation integrity test Drilled to 11605.0 ft Drilled to 11898.0 ft (cont...) Facility Date/Time 30 Aug 98 31 Aug 98 01 Sep 98 02 Sep 98 03 Sep 98 04 Sep 98 Pt Mac 2 Progress Report Well P2-04PB 1 Rig Nabors 33E Page Date Duration Activity 06:00-07:00 07:00-11:00 11:00-12:00 12:00-12:30 12:30-13:30 13:30-15:00 15:00-17:30 17:30-18:00 18:00-19:30 19:30-00:00 00:00-06:00 06:00-06:00 06:00-11:30 11:30-13:00 13:00-14:00 14:00-15:00 15:00-16:30 16:30-21:30 21:30-23:00 23:00-23:30 23:30-23:45 23:45-06:00 06:00-12:00 12:00-13:30 13:30-14:30 14:30-16:30 16:30-17:00 17:00-17:15 17:15-17:30 17:30-18:00 18:00-18:15 18:15-19:30 19:30-21:00 21:00-22:00 22:00-23:00 23:00-05:00 05:00-05:30 05:30-06:00 06:00-06:30 06:30-10:30 10:30-15:30 15:30-16:00 16:00-16:15 16:15-16:30 16:30-17:00 17:00-17:30 17:30-19:00 19:00-20:00 20:00-20:15 20:15-20:30 20:30-00:00 00:00-04:30 04:30-04:45 04:45-05:00 1 hr 4 hr 1 hr 1/2 hr 1 hr 1-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 4-1/2 hr 6hr 24 hr 5-1/2 hr 1-1/2 hr lhr lhr 1-1/2 hr 5 hr 1-1/2 hr 1/2 hr 1/4 hr 6-1/4 hr 6 hr 1-1/2 hr 1 hr 2 hr 1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 1-1/4 hr 1-1/2 hr 1 hr 1 hr 6 hr 1/2 hr 1/2 hr 1/2 hr 4 hr 5 hr 1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 1/4 hr 1/4 hr 3-1/2 hr 4-1/2 hr 1/4 hr 1/4 hr Circulated at 11898.0 ft Pulled out of hole to 197.0 ft Pulled BHA Retrieved Wear bushing Tested Top drive Serviced Block line Tested BOP stack Installed Wear bushing Made up BHA no. 7 R.I.H. to 11898.0 ft Drilled to 11994.0 ft Drilled to 12725.0 ft (cont...) Drilled to 13000.0 ft (cont...) Circulated at 13000.0 ft Pulled out of hole to 11430.0 ft R.I.H. to 13000.0 ft Circulated at 13000.0 ft Pulled out of hole to 198.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Liner to 1771.0 ft (4-1/2in OD) Ran Drillpipe on landing string to 11400.0 ft Circulated at 11400.0 ft Ran Drillpipe on landing string to 13000.0 ft Circulated at 13000.0 ft Held safety meeting Pumped Brine spacers - volume 70.000 bbl Mixed and pumped slurry - 46.000 bbl Displaced slurry - 121.000 bbl Functioned Liner hanger Circulated at 12940.0 ft Serviced Trip tank Pulled Drillpipe in stands to 11200.0 ft Tested Liner - Via annulus and string Pulled Drillpipe in stands to 0.0 ft Serviced Drillfloor / Derrick Rigged up Drillstring handling equipment Held safety meeting Installed Gun assembly Ran Drillpipe to 12912.0 ft (4in OD) Held safety meeting Set packer at 11061.0 ft with 0.0 psi Tested High pressure lines Perforated Functioned Retrievable packer Reverse circulated at 11050.0 ft Pulled Drillpipe in stands to 11200.0 ft Flow check Serviced Drillstring handling equipment Pulled Drillpipe in stands to 1452.0 ft Retrieved Gun assembly Retrieved B ore protector Installed BOP test plug assembly 4 01 October 98 Facility Date/Time 05 Sep 98 06 Sep 98 Progress Report Pt Mac 2 Well P2-04PB 1 Page 5 Rig Nabors 33E Date 01 October 98 05:00-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-21:30 21:30-22:00 22:00-01:30 01:30-02:00 02:00-06:00 06:00-07:00 07:00-08:00 08:00-08:30 08:30-09:30 09:30-12:00 12:00-14:00 14:00-17:00 17:00-17:30 17:30-20:30 20:30-21:00 21:00-23:00 23:00-00:00 00:00-01:00 01:00-02:00 02:00-03:00 03:00-03:30 03:30-04:00 04:00-04:15 04:15-06:00 06:00-08:00 08:00-08:30 08:30-09:30 09:30-09:45 09:45-10:30 10:30-11:00 11:00-11:15 11:15-11:30 11:30-12:30 Duration 1/2 hr 1/2 hr 1/2 hr 2 hr 13hr 1/2 hr 3-1/2 hr 1/2 hr 4 hr 1 hr 1 hr 1/2 hr lhr 2-1/2 hr 2hr 3hr 1/2 hr 3 hr 1/2 hr 2 hr 1 hr 1 hr 1 hr 1 hr 1/2 hr 1/2 hr 1/4 hr 1-3/4 hr 2 hr 1/2 hr 1 hr 1/4 hr 3/4 hr 1/2 hr 1/4 hr 1/4 hr lhr Activity Serviced Drillfloor / Derrick Worked on BOP - Top ram Tested Top ram Rigged up Completion string handling equipment Ran Tubing to 7250.0 ft (4-1/2in OD) Serviced Handling equipment Ran Tubing to 9250.0 ft (4-1/2in OD) Installed SCSSSV nipple assembly Ran Tubing to 4-1/2in (11100.0 ft OD) Ran Tubing to 11100.0 ft (4-1/2in OD) (cont...) Installed Tubing hanger Stung into Liner hanger Reverse circulated at 11217.0 ft Packer worked at 11161.0 ft Conducted slickline operations on Slickline equipment - Retrival run Rigged up sub-surface equipment - Completion string sub-assemblies Conducted slickline operations on Slickline equipment - Retrival run Conducted slickline operations on Slickline equipment - Tool run Test Lubricator unit Conducted slickline operations on Slickline equipment ~ Tool run Conducted slickline operations on Slickline equipment - Setting run Rigged down Slickline unit Tested Permanent packer - Via string Tested Permanent packer - Via annulus Functioned Side pocket valve Installed Hanger plug Tested Hanger plug Removed BOP stack Removed BOP stack (cont...) Installed Tubing bonnet Installed Xmas tree Tested Tubing bonnet Tested Xmas tree Tested Accessories Removed Hanger plug Installed Hanger plug Rigged down Drillfloor / Derrick Operator ARCO Performance Enquiry Report Date 21:24, 29 Sep 98 Page The analysis is from - 04:00, 15 Aug 98 - to - 23:30, 28 Aug 98 Programs in Result Table: P2-04 Well Type P2-04 Event P2-04 Event Time From Time To Duration DescriDtion E.M.W.(equivalent mud weight) 04:00, 15 Aug 98 04:00, 15 Aug 98 0 hr 0 min Obtained leak off 12.3 23:30, 28 Aug 98 23:30, 28 Aug 98 0 hr 0 min Obtained required level of integrity 12.0 Hole Size MDR 8-3/4 6 Interval Feet 11460-11592 132 11636-11768 132 11812-11944 132 11988-12120 132 12164-12296 132 12340-12406 66 12626-12758 132 12802-12912 110 SPF Date Type 03-Se ~-98 2 3/4" Scallop 03-Se ~-98 2 3/4" Scallop 03-Se 3-98 2 3/4" Scallop 03-Se 3-98 2 3/4" Scallop 03-Se 9-98 2 3/4" Scallop 03-Se 3-98 2 3/4" Scallop 03-Se 3-98 2 3/4" Scallop 03-Se )-98 2 3/4" Scallop Comment TCP TCP TCP TCP TCP TCP TCP TCP P2-04 is a producer. ri I::! I I_1_ I I~1 G S E I::!~1 l-- E S 12-0ct-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well P2-04 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 10,688.70' MD Window / Kickoff Survey: 10,783.09' MD Projected Survey: 13,000.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) OCT 14 1998 Alaska Oil & Gas Cons. Commissior~ A~homge 5631 Silverado Way, Suite G · Anchorage, Alaska 995t8 · (907) 273-3500 · Fax (907) 273-3535 A Dresser Industries, Inc. Company Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-04 SURVEY REPORT October, 1998 Your Ref: AP1-500292290700 Last Survey Date 2:2~iugust-98 Job# AKMMS0331 KBE- 50.00' DRILLING c:;ERVICES ORIGINAL ~ECE~VEO Survey Ref: svy624 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Survey Report for P2-04 Your Ref: API-500292290700 10688.70 63.980 333.060 8676.17 10783.09 65.670 332.610 8716.32 10867.49 67.330 336.090 8749.98 10899.45 67.850 336.780 8762.17 10931.32 69.170 337.400 8773.84 10960.20 71.440 336.880 8783.57 11055.93 79.220 335.270 8807.80 11150.64 81.250 334.540 8823.86 11247.17 79.560 335.770 8839.95 11338.00 79.590 336.770 8856.39 11394.74 79.250 336.700 8866.81 11422.56 80.780 336.820 8871.63 11452.24 83.060 336.950 8875.80 11486.41 85.100 337.110 8879.32 11514.52 87.630 336.330 8881.11 11548.34 91.140 333.800 8881.47 11580.48 93.450 330.850 8880.18 11610.27 91.820 329.170 8878.81 11643.29 88.950 326.030 8878.59 11674.40 87.100 323.250 8879.66 11705.65 89.200 320.850 8880.67 11738.73 88.310 316.220 8881.39 11771.55 87.510 311.940 8882.59 11803.33 86.300 308.390 8884.31 11835.77 86.980 305.680 8886.21 11866.37 87.910 304.770 8887.57 11900.69 88.580 304.240 8888.62 11932.71 87.720 302.160 8889.66 11963.61 87.410 302.370 8890.97 11995.71 86.490 300.500 8892.68 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 8726.17 4911.33 N 332.63 E 8766.32 4987.33 N 293.63 E 8799.98 5057.09 N 260.14 E 8812.17 5084.17 N 248.33 E 8823,84 5111.49 N 236.79 E 8833.57 5136.54 N 226.23 E 8857.80 5221.11 N 188.68 E 8873.86 5305.64 N 149.09 E 8889.95 5392.00 N 109.10 E 8906.39 5473.78 N 73.15 E 8916.81 5525.02 N 51.12 E 8921.63 5550.19 N 40.31E 8925.80 5577.22 N 28.78 E 8929.32 5608.51N 15.51E 8931.11 5634.27 N 4.43 E 8931.47 5664.93 N 9.83W 8930,18 5693.37 N 24.74W 8928.81 5719.14 N 39.61W 8928.59 5747.01 N 57.30W 8929.66 5772.37 N 75.29W 8930.67 5796.99 N 94.50W 8931.39 5821.77 N 116.39W 8932.59 5844.58 N 139.95W 8934.31 5865.04 N 164.19W 8936.21 5884.55 N 190.04W 8937.57 5902.18 N 215.01W 8938.62 5921.61N 243.28W 8939.66 5939.13 N 270.06W 8940.97 5955.61 N 296.16W 8942.68 5972.33 N 323.51W 6003535.28 N 681466.07 E 6003610.31 N 681425.24 E 6003679.24 N 681390.07 E 6003706.03 N 681377.60 E 6003733.06 N 681365.40 E 6003757.85 N 681354.24 E 6003841.48 N 681314.65 E 6003925.02 N 681273.02 E 6004010.39 N 681230.95 E 6004091.27 N 681193.03 E 6004141.96 N 681169.76 E 6004166.87 N 681158.34 E 6004193.60 N 681146.15 E 6004224.56 N 681132.14 E 6004250.05 N 681120.43 E 6004280.36 N 681105.43 E 6004308.42 N 681089.84 E 6004333.83 N 681074.34 E 6004361.26 N 681055.98 E 6004386.17 N 681037.38 E 6004410.32 N 681017.59 E 6004434.56 N 680995.10 E 6004456.80 N 680971.00 E 6004476.67 N 680946.26 E 6004495.54 N 680919.95 E 6004512.56 N 680894.55 E 6004531.30 N 680865.82 E 6004548.17 N 680838.63 E 6004564.01 N 680812.13 E 6004580.06 N 680784.39 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Rate (°/100ft) 1.842 4.262 2.575 4.520 8.041 8.288 2.274 2.155 1.083 0.611 5.516 7.694 5.988 9.417 12.792 11.651 7.853 12.882 10.729 10.202 14.249 13.258 11.786 8.599 4.250 2.489 7.026 1.211 6.485 Vertical Section (ft) Comment 4736.89 4819.30 4894.48 4923.41 4952.52 4979.22 5069.72 5160.59 5253.35 5340.79 5395.47 5422.34 5451.16 5484.51 5512.01 5544.96 5575.86 5604.14 5635.07 5663.59 5691.65 5720.41 5747.59 5772.62 5797.O4 5819.45 5844.30 5866.97 5888.48 5910.48 Tie-on Survey Window Point Continued... 12 October, 1998 - 7:31 - 2- DrillQuest Sperry-Sun Drilling Services Survey Report for P2-04 Your Ref: AP1-500292290700 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 12026.88 84.730 298.860 8895.06 8945.06 5987.72 N 350.51 W - 12123.24 89.660 292,490 8899.78 8949.78 6029.37 N 437.19 W 12217.70 90,220 285.560 8899.88 8949.88 6060.15 N 526.43 W 12313.20 90.120 280,730 8899.60 8949.60 6081.86 N 619.40 W 12410.41 89.050 282.650 8900.30 8950.30 6101.55 N 714.59 W 12506.10 89,600 275,060 8901.43 8951.43 6116.27 N 809.06 W 12602.07 88.120 274,300 8903.34 8953.34 6124.10 N 904.69 W 12698.20 91.790 276.580 8903.42 8953.42 6133.21 N 1000.36 W 12792.91 90.000 274.080 8901.94 8951.94 6142.01 N 1094.64 W 12888.66 89.380 275.590 8902.45 8952.45 6150.08 N 1190.05 W 12937.85 89,780 277.840 8902.81 8952,81 6155.83 N 1238.89 W 13000.00 89.780 277.840 8903.05 8953.05 6164.31 N 1300.46 W 6004594.79 N 680757.02 E 6004634.33 N 680669.36 E 6004662.93 N 680579.40 E 6004682.38 N 680485.93 E 6004699.76 N 680390.29 E 6004712.18 N 680295.49 E 6004717.68 N 680199.70 E 6004724.47 N 680103.83 E 6004730.98 N 680009.37 E 6004736.73 N 679913.80 E 6004741.30 N 679864.82 E 6004748.28 N 679803.07 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 348.087° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13000.00ft., The Bottom Hole Displacement is 6299.99ft., in the Direction of 348.087° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Rate (°/lOOft) Vertical Section (ft) Comment 7.707 8.351 7.360 5.059 2.261 7.952 1.734 4.494 3.246 1.705 4.646 0.000 5931.11 5989.76 6038.30 6078.73 6117.65 6151.55 6178.95 6207.62 6235.68 6263.27 6278.98 6299.99 Projected Survey Continued... 12 October, 1998 - 7:31 - 3 - DrillQuest Shared Services Drilling Point Mclntrye Sperry-Sun Drilling Services Survey Report for P2-04 Your Ref: API-500292290700 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comments Measured Depth (ft) 10688.70 10783.09 13000.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8726.17 4911.33 N 332.63 E 8766.32 4987.33 N 293.63 E 8953.05 6164.31 N 1300.46 W Comment Tie-on Survey Window Point Projected Survey 12 October, 1998 - 7:31 - 4 - DrillQuest OF:III_lING S I:= F! U I I-- I=: S 12-Oct-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re' Distribution of Survey Data for Well P2-04PB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 13,225.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company Shared Services Drilling Point MclntrYe Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-O4PB~ S UR VEY REPORT October, ~ 998 Your Ref: API-500292290770 Last Day of Survey 2&.August-98 Job# A KMM80331 KBE. 50.00' DRILLING SERVICES OCT 14 1998 ~e 0~ a ~as Cons, Commssion · ~omge ORIGINAL Survey Ref: svy622 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 0.00 0.000 0.000 -50.00 100.00 0.270 325.020 50.00 195.00 0.370 0.220 145.00 231.08 0.180 295.490 181.08 318.78 1.950 190.320 268.76 410.26 3.100 187.720 360.15 496.85 4.320 178.410 446.56 588.95 4.170 175.610 538.41 678.86 4.310 178.050 628.07 768.55 4.220 178.630 717.51 859.46 4.470 173.140 808.16 946.82 5.170 174.670 895.21 1038.63 4.640 191.550 986.69 1133.94 4.880 214.410 1081.68 1228.64 6.170 228.440 1175.94 1322.24 6.750 229.760 1268.95 1417.15 6.280 231.790 1363.24 1511.78 3.770 253.860 1457.51 1605.12 3.290 288.430 1550.68 1697.53 2.590 307.160 1642.97 1792.37 2.480 314.910 1737.72 1887.29 2.190 314.120 1832.56 1980.72 2.300 310.540 1925.92 2076.26 2.490 313.200 2021.38 2169.96 2.630 14.120 2115.00 2264.85 3.020 21.400 2209.77 2359.25 4.930 7.220 2303.95 2454.34 6.210 9.350 2398.58 2547.35 7.550 14.550 2490.92 2641.54 8.770 17.500 2584.16 Sperry-Sun Drilling Services Survey Report for P2-O4PB1 Your Ref: API-500292290770 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 0.00 0.00 N 0.00 E 100.00 0.19 N 0.14W 195.00 0.68 N 0.26W 231.08 0.82 N 0.31W 318.76 0.58 S 0.70W 410.15 4.57 S 1.32W 496.56 10.15 S 1.54W 588.41 16.95 S 1.19W 678.07 23.59 S 0.82W 767.51 30.26 S 0.63W 858.16 37.12 S 0.13W 945.21 44.42 S 0.65 E 1036.69 52.17 S 0.29 E 1131.68 59.30 S 2.78W 1225.94 66.00 S 8.86W 1318.95 72.89 S 16.82W 1413.24 79.70 S 25.16W 1507.51 83.77 S 32.22W 1600.68 83.77 S 37.71W 1692.97 81.68 S 41.89W 1787.72 78.93 S 45.05W 1882.56 76.22 S 47.80W 1975.92 73.76 S 50.51W 2071.38 71.09 S 53.48W 2165.00 67.61 S 54.44W 2259.77 63.17 S 53.00W 2353.95 56.83 S 51.58W 2448.58 47.71 S 50.23W 2540.92 36.83 S 47.88W 2634.16 23.99 S 44.16W 5998617.33 N 681252.67 E 5998617.52 N 681252.53 E 5998618.01N 681252.39 E 5998618.15 N 681252.34 E 5998616.73 N 681251.98 E 5998612.73 N 681251.47 E 5998607.15 N 681251.38 E 5998600.35 N 681251.89 E 5998593.73 N 681252.42 E 5998587.07 N 681252.78 E 5998580.22 N 681253.45 E 5998572.94 N 681254.39 E 5998565.18 N 681254.22 E 5998557.98 N 681251.33 E 5998551.14 N 681245.41 E 5998544.06 N 681237.62 E 5998537.04 N 681229.45 E 5998532.80 N 681222.49 E 5998532.67 N 681217.01 E 5998534.66 N 681212.78 E 5998537.33 N 681209.55 E 5998539.97 N 681206.73 E 5998542.37 N 681203.96 E 5998544.96 N 681200.93 E 5998548.42 N 681199.89 E 5998552.89 N 681201.22 E 5998559.26 N 681202.49 E 5998568.42 N 681203.61 E 5998579.35 N 681205.70 E 5998592.28 N 681209.10 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Vertical Rate Section (o/'~ooft) (ft) Comment 0.00 0.270 0.22 0.227 0.73 0.929 0.88 2.286 -0.38 1.263 -4.07 1.567 -9.40 0.278 -16.07 0.254 -22.58 0.111 -29.07 0.533 -35.82 0.815 -43.08 1.667 -50.48 1.993 -56.56 1.963 -61.46 0.640 -66.06 0.551 -70.49 3.302 -72.60 2.299 -71.18 1.277 -68.07 0.379 -64.61 0.307 -61.28 0.191 -58.20 0.230 -54.85 2.772 -51.25 0.558 -47.33 2.261 -41.57 1.363 -33.10 1.587 -23.20 1.369 -11.76 Continued... 12 October, 1998 - 7:22 - 2- DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Survey Report for P2-O4PB1 Your Ref: API-500292290770 2737.06 10.190 18.790 2678.37 2831.70 11.220 15.780 2771.36 2928.51 13.180 11.840 2865.98 3022.21 14.300 16.190 2957.00 3116.46 15.780 16.620 3048.02 3212.51 18.470 15.990 3139.81 3306.62 20.490 13.990 3228.53 3402.06 21.010 12.310 3317.78 3495.68 21.520 17.460 3405.03 3588.04 23.220 13.530 3490.44 3683.78 24.460 9.160 3578.02 3779.06 25.060 8.090 3664.54 3873.56 27.180 12.230 3749.39 3968.31 31.140 14.610 3832.12 4060.79 32.370 11.890 3910.76 4157.74 32.600 7.290 3992.55 4252.48 32.200 6.780 4072.54 4346.41 31.680 5,340 4152.25 4441.95 32.120 7.970 4233.36 4537.00 32.160 11.520 4313.86 4628.67 33.040 10.510 4391.08 4727.17 33.170 10.960 4473.59 4818.75 32.910 10.870 4550.36 4914.17 32.160 8.770 4630.81 5009.42 32.040 8.650 4711.50 5103.33 32.700 10.830 4790.82 5197,21 31.870 9.030 4870.19 5306.83 30.610 8.620 4963.91 5401.12 30.150 8.450 5045.25 5494.79 32.430 9.920 5125.30 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 2728,37 9.04 S 39.25 W 2821.36 7.74 N 34.05 W 2915.98 27.61 N 29.22 W 3007.00 49.18 N 23.81 W 3098.02 72.64 N 16.89 W 3189.81 99.78 N 8.97 VV 3278.53 130.10 N 0.88 W 3367.78 163.03 N 6.81 E 3455.03 195.81 N 15.54 E 3540.44 229.67 N 24.88 E 3628.02 267.59 N 32.46 E 3714.54 307.05 N 38.44 E 3799.39 347.96 N 45.83 E 3882.12 392.84 N 56.59 E 3960.76 440.21 N 67.73 E 4042.55 491.52 N 76.39 E 4122.54 541.90 N 82.61 E 4202.25 591.31 N 87.86 E 4283.36 641.44 N 93.72 E 4363.86 691.26 N 102.27 E 4441.08 739.74 N 111.70 E 4523.59 792.59 N 121.72 E 4600.36 841.62 N 131.18 E 4680.81 892.18 N 139.94 E 4761.50 942.21 N 147.60 E 4840.82 991.76 N 156.12 E 4920.19 1041.14 N 164.77 E 5013.91 1097.32 N 173.50 E 5095.25 1144.48 N 180.58 E 5175.30 1192.49 N 188.36 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Vertical Rate Section (°/100ft) (ft) 5998607.34 N 681213.65 E 1.503 1.41 5998624.24 N 681218.44 E 1.238 16.28 5998644.22 N 681222.78 E 2.199 34.23 5998665.92 N 681227.68 E 1.625 53.66 5998689.54 N 681234.02 E 1.575 74.54 5998716.87 N 681241.29 E 2.807 98.71 5998747.37 N 681248.64 E 2.260 125.91 5998780.47 N 681255.52 E 0.828 155.73 5998813.46 N 681263.46 E 2.067 185.14 5998847.54 N 681271.98 E 2.451 215.44 5998885.63 N 681278.63 E 2.253 250.11 5998925.22 N 681283.65 E 0.786 286.68 5998966.30 N 681290.04 E 2.957 324.30 5999011.43 N 681299.72 E 4.354 364.86 5999059.05 N 681309.70 E 2.041 407.75 5999110.55 N 681317.12 E 2.559 455.07 5999161.07 N 681322.11 E 0.511 502.14 5999210.60 N 681326.16 E 0.982 548.51 5999260.86 N 681330.80 E 1.526 595.43 5999310.87 N 681338.14 E 1.987 641.34 5999359.56 N 681346.40 E 1.129 685.73 5999412.64 N 681355.13 E 0.282 734.21 5999461.89 N 681363.40 E 0.289 779.12 5999512.64 N 681370.93 E 1.421 825.70 5999562.85 N 681377.38 E 0.143 872.05 5999612.58 N 681384.69 E 1,428 917.71 5999662.16 N 681392.14 E 1.353 963.18 5999718.53 N 681399.50 E 1.166 1015.20 5999765.85 N 681405.43 E 0.496 1058.92 5999814.04 N 681412.05 E 2.567 1103.29 Comment Continued... 12 October, 1998 - 7:22 - 3- DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 5590.60 36.230 11.300 5204.40 5685.16 38.880 9.930 5279.36 5780.63 41.650 8.970 5352.20 5874.55 43.430 7.600 5421.40 5968.44 44.830 7.550 5488.79 6063.89 47.360 8.430 5554.98 6160.03 47.640 8.580 5619.93 6254.61 47.280 8.830 5683.88 6349.82 46.810 8.880 5748.75 6443.28 46.350 9.910 5812.99 6535.93 46.750 7.300 5876.72 6630.31 46.890 8.330 5941.30 6724.59 47.290 4.330 6005.51 6819.16 47.570 3.700 6069.48 6914.72 47.460 2.330 6134.02 7007.81 48.580 1.890 6196.29 7101.86 47.840 4.070 6258.97 7195.93 47.710 3.070 6322.19 7290.18 45.740 5.240 6386.80 7385.11 45.530 4.680 6453.17 7479.17 45.260 8.440 6519.24 7574.23 45.720 8.490 6585.88 7667.98 46.200 8.000 6651.05 7763.54 46.660 7.120 6716.91 7857.97 46.240 6.950 6781.97 7952.53 46.180 6.370 6847.41 8046.95 45.910 6.100 6912.95 8141.37 46.070 4.980 6978.55 8236.16 44.630 6.610 7045.17 8329.77 44.030 6.580 7112.13 Sperry-Sun Drifting Services Survey Report for P2-O4PB1 Your Ref: API-500292290770 Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 5254.40 1245.58 N 198.34 E 5329.36 1302.23 N 208.93 E 5402.20 1363.09 N 219.05 E 5471.40 1425.92 N 228.19 E 5538.79 1490.73 N 236.80 E 5604.98 1558.82 N 246.37 E 5669.93 1628.92 N 256.86 E 5733.88 1697.81N 267.40 E 5798.75 1766.66 N 278.13 E 5862.99 1833.63 N 289.21 E 5926.72 1900.12 N 299.26 E 5991.30 1968.31 N 308.62 E 6055.51 2036,91 N 316.22 E 6119.48 2106.39 N 321.10 E 6184.02 2176.76 N 324.81E 6246.29 2245.91N 327.35 E 6308.97 2315.93 N 330.99 E 6372.19 2385.45 N 335.33 E 6436.80 2453.88 N 340.28 E 6503.17 2521.49 N 346.15 E 6569.24 2588.00 N 353.79 E 6635.88 2655.05 N 363.77 E 6701.05 2721.75 N 373.43 E 6766.91 2790.38 N 382.54 E 6831.97 2858.31N 390.92 E 6897.41 2926.10 N 398.84 E 6962.95 2993,67 N 406.22 E 7028.55 3061.26 N 412.78 E 7095.17 3128.35 N 419.57 E 7162.13 3193.33 N 427.08 E Global Coordinates Northings Eastings (ft) (ft) 5999867.36 N 681420.74 E 5999924.24 N 681429.95 E 5999985.33 N 681438.59 E 6000048.37 N 681446.20 E 6000113.36 N 681453.24 E 6000181.67 N 681461.16 E 6000252.00 N 681469.94 E 6000321.12 N 681478.81E 6000390.22 N 681487.86 E 6000457.44 N 681497.31 E 6000524.15 N 681505.76 E 6000592.54 N 681513.46 E 6000661.31N 681519.39 E 6000730.89 N 681522.58 E 6000801.33 N 681524.58 E 6000870.52 N 681525.45 E 6000940.61N 681527.39 E 6001010.21 N 681530.04 E 6001078.75 N 681533.33 E 6001146.48 N 681537.55 E 6001213.15 N 681543.58 E 6001280.42 N 681551.93 E 6001347.33 N 681559.97 E 6001416.17 N 681567.41 E 6001484.28 N 681574.14 E 6001552.25 N 681580.41 E 6001619.98 N 681586.16 E 6001687.71N 681591.07 E 6001754.94 N 681596.24 E 6001820.08 N 681602.17 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Vertical Rate Section (°/100ft) (ft) Comment 4.048 1152.00 2.938 1203.98 2.973 1260.16 2.136 1318.50 1.492 1378.88 2.733 1442.18 0.313 1507.19 0.428 1571.01 0.495 1634.75 0.940 1696.59 2.090 1758.22 0.810 1821.67 3.136 1885.98 0.573 1951.83 1.063 2018.85 1.253 2085.00 1.899 2151.70 0.799 2217.74 2.679 2282.56 0.476 2346.36 2.860 2408.63 0.485 2470.83 0.635 2532.76 0.823 2596.71 0.464 2660.16 0.447 2723.61 0.352 2786.97 0.870 2850.57 1.950 2913.62 0.641 2974.45 Continued... 12 October, 1998 - 7:22 - 4 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 8423.47 43.290 5.840 7179.92 8518.29 43.800 5.000 7248.64 8613.53 44.820 6.320 7316.80 8710.22 45.620 5.560 7384.90 8803.93 44.660 4.650 7451.00 8898.21 46.240 6,080 7517.14 8992.20 45.270 6,220 7582.72 9085.42 43.980 5.560 7649.07 9181.75 45.010 4.710 7717.78 9275.73 43.750 4.170 7784.95 9370.83 45.700 3.140 7852,51 9465.20 48.270 4.200 7916.89 9559.70 47.400 3.340 7980.32 9653.99 46.350 2.120 8044.78 9747.71 45.280 1.240 8110.10 9842.12 47.120 358.930 8175.45 9936.09 48.750 355.380 8238.41 10031.06 49.090 351.890 8300.83 10126.03 47.960 350.910 8363.73 10220.82 49.720 348.780 8426.12 10315.99 52.410 345.030 8485.93 10410.81 56.620 339.410 8540.99 10498.32 59.610 335.880 8587.22 10593.21 62.480 333. 540 8633.16 10688.70 63.980 333.060 8676.17 10783.09 65.670 332.610 8716.32 10845.26 67.490 332.820 8741.03 10877.43 68.870 331.550 8752.99 10971.90 73.030 327.100 8783.83 11066.46 76.070 323.130 8809.02 Sperry-Sun Drilling Services Survey Report for P2-O4PB1 Your Ref: API-500292290770 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 7229.92 3257.64 N 434.09 E 7298.64 3322.67 N 440.25 E 7366.80 3388.87 N 446.82 E 7434.90 3457.13 N 453.92 E 7501.00 3523.29 N 459.83 E 7567.14 3590.17 N 466.13 E 7632.72 3657.12 N 473.34 E 7699.07 3722.25 N 480.06 E 7767.78 3789.49 N 486.10 E 7834.95 3855.02 N 491.19 E 7902.51 3921.81 N 495.45 E 7966.89 3990.66 N 499.88 E 8030.32 4060.55 N 504,49 E 8094.78 4129.29 N 507.77 E 8160.10 4196.46 N 509.75 E 8225.45 4264.59 N 509.83 E 8288.41 4334.24 N 506.34 E 8350.83 4405.37 N 498.40 E 8413.73 4475.72 N 487.76 E 8476.12 4545.95 N 475.17 E 8535.93 4618,02 N 458.36 E 8590.99 4691.44 N 434.70 E 8637.22 4760.12 N 406.42 E 8683.16 4835.17 N 370,94 E 8726,17 4911.33 N 332.63 E 8766.32 4987.33 N 293.63 E 8791.03 5038.03 N 267.48 E 8802.99 5064.44 N 253.54 E 8833.83 5141.18 N 207.97 E 8859.02 5215.90 N 155.84 E 6001884,54 N 681607.61E 6001949.70 N 681612.20 E 6002016.04 N 681617.16 E 6002084.45 N 681622.60 E 6002150.74 N 681626.91E 6002217.75 N 681631.58 E 6002284.85 N 681637.16 E 6002350.13 N 681642,30 E 6002417.50 N 681646.71E 6002483.13 N 681650.21 E 6002550.00 N 681652.85 E 6002618.94 N 681655.60 E 6002688.92 N 681658.52 E 6002757.72 N 681660,13 E 6002824.92 N 681660.48 E 6002893.03 N 681658.90 E 6002962.58 N 681653.73 E 6003033.49 N 681644.06 E 6003103.56 N 681631.73 E 6003173.47 N 681617.43 E 6003245.11 N 681598.87 E 6003317.94 N 681573.45 E 6003385.91N 681543.51E 6003460.07 N 681506.21E 6003535.28 N 681466.07 E 6003610.31N 681425.24 E 6003660.36 N 681397.86 E 6003686.43 N 681383.29 E 6003762.04 N 681335.87 E 6003835.48 N 681281.95 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Vertical Rate Section (°/100ft) (ft) Comment 0.960 3034.77 0.813 3095.99 1.444 3158.25 0.998 3222.35 1.234 3284.74 1.994 3347.72 1.038 3410.53 1.470 3471.71 1.235 3535.11 1.400 3597.10 2.187 3660.51 2.844 3725,88 1.141 3792.20 1.460 3857.75 1.325 3922.14 2.630 3987.93 3.297 4056.12 2.793 4126.88 1.419 4197.59 2.512 4268.69 4.169 4342.65 6.555 4419.70 4.837 4493.35 3.715 4575.02 1.634 4658.50 1.842 4741.99 2.944 4797.73 5.642 4826.84 6.261 4912.75 5.168 4998,41 Continued... 12 October, 1998 - 7:22 - 5- DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sperry-Sun Drilling Services Survey Report for P2-O4PBI Your Ref: API-500292290770 Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 11161.30 77.800 321.910 8830.46 11254.51 76.710 322.600 8851.03 11348.99 76.250 323.280 8873.11 11443,83 79.320 320.560 8893.18 11537.64 82.220 318.010 8908.23 11631,88 84.110 316.560 8919.45 11726,02 87.430 314.820 8926.39 11820.88 88.810 309.890 8929.50 11916.39 89.920 305.280 8930.56 12011.64 91.230 301.870 8929.61 12105.25 89.020 296.760 8929.40 12201.63 87.700 291.130 8932.16 12296.00 88.330 286.300 8935.43 12390.59 91.270 283.450 8935.76 12484.31 91.050 278.930 8933.86 12576.77 87.960 277.830 8934.66 12673.53 82.300 276.330 8942.88 12766.38 77.990 274.710 8958.76 12861.26 76.870 274.400 8979.41 12956.67 74.600 275.330 9002.92 13050.93 70.620 276.280 9031.09 13145.87 67.610 276.530 9064.93 13164.62 67.380 276.480 9072.11 13225.00 67.380 276.480 9095.33 8880.46 5289.21N 99.63 E 8901.03 5361.10 N 43.98 E 8923.11 5434.40 N 11.39W 8943.18 5507.34 N 68.55W 8958.23 5577.51N 128.95W 8969.45 5646.25 N 192.42VV 8976.39 5713.42 N 257.99W 8979.50 5777.27 N 328.03W 8980.56 5835.50 N 403.69W 8979.61 5888.17 N 483.03W 8979.40 5933.98 N 564.62W 8982.16 5973.07 N 652.63W 8985.43 6003.32 N 741.93W 8985.76 6027.60 N 833.33W 8983.86 6045.78 N 925.23W 8984.66 6059.25 N 1016,68W 8992.88 6071.13 N 1112,32W 9008.76 6079.94 N 1203.35W 9029.41 6087.29 N 1295.66W 9052.92 6095.13 N 1387.79W 9081.09 6104.22 N 1477.26W 9114,93 6114.11N 1565.40W 9122,11 6116.07 N 1582.61W 9145.33 6122,36 N 1637.99W Global Coordinates Northings Eastings (ft) (ft) 6003907.40 N 681223.97 E 6003977.92 N 681166.59 E 6004049.86 N 681109.47 E 6004121.39 N 681050.55 E 6004190.07 N 680988.47 E 6004257.25 N 680923.35 E 6004322.81N 680856.17 E 6004384.94 N 680784.60 E 6004441.32 N 680707.55 E 6004492.05 N 680626.96 E 6004535.87 N 680544.28 E 6004572.81 N 680455.35 E 6004600.89 N 680365.34 E 6004622.94 N 680273.38 E 6004638.88 N 680181.07 E 6004650.13 N 680089.31E 6004659.69 N 679993.42 E 6004666.29 N 679902.20 E 6004671.40 N 679809.74 E 6004677.00 N 679717.44 E 6004683.92 N 679627.78 E 6004691.67 N 679539.43 E 6004693.21 N 679522.17 E 6004698.16 N 679466.66 E Alaska State Plane Zone 4 Point Mclntyre Pad 2 Dogleg Rate (°/100ft) Vertical Section (ft) Comment 2.213 1.374 0.852 4.282 4.093 2.521 3.979 5.394 4.964 3.835 5.947 5.997 5.158 4.329 4.828 3.547 6.050 4.950 1.223 2.560 4.330 3.180 1.251 0.000 5083.76 5167.58 5252.71 5337.94 5421.33 5504.14 5585.98 5665.76 5741.57 5812.95 5878.30 5938.8O 5991.11 6038.18 6079.49 6116.14 6152.34 6184.37 6215.34 6246.72 6278.62 6310.96 6317.30 6337.69 Projected Survey Continued... 12 October, 1998 - 7:22 - 6 - DrillQuest Shared Services Drilling Point Mclntrye Sperry-Sun Drilling Services Survey Report for P2-O4PB1 Your Ref: API-500292290770 Alaska State Plane Zone 4 Point Mclntyre Pad 2 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 345.022° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13225.00ft., The Bottom Hole Displacement is 6337.69ft., in the Direction of 345.022° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 0.00 0.00 0.00 N 0.00 E Tie-on Survey 13225.00 9145.33 6122.36 N 1637.99 W Projected Survey 12 October, 1998 - 7:22 - 7- DrillQuest ~8124/98 14:50 FAX 907 564 5193 BP EXPLORATION BP EXPLORATION ~1D Explo~alion (Alaska) Inc. ~D0 Eest Benson Boulevard P.O_ Box 196612 Anchorage, Alaska g9519-6612 (gO?) 561.5111 DATE:__ TO: Company: dog Crt Location: 'Fax Number: TELECOPY FROM: Department."' Location: Fax Number: PAGES TO FOLL.0W) AUG 2 4 ]~)$)8 08/24/98 1.4:51. FAX 907 564 5193 Alaska hared ervices rilling BP EXPLORATION ~ uu~ To' Blair Wondzell l~ . From: Greg Hobbsfi~[~. . Date: 8/24/98 Re: Point Mclntyre Well P2-04 Geologic Sidetrack Per our phone conversation of 8/22/98, here is your requested written notice of the Point Mclntyre Well P2-04 geologic sidetrack. Well P2-04 (Permit ft 98-156) was drilled as a high angle Iongstring well with a planned drop at the tip to verify water influx in the lower Kuparuk Sands in the area. When the Kuparuk was penetrated, it was found to be 30 feet TVD high from prognosis. The high angle section was then adjusted to be horizontal instead of the 87-88 degrees that was originally planned. This adjustment was meant to allow the well to distance itself from any water below the high angle section as its length increased (Reservoir Dip in the area was estimated at 2 degrees). When the drop at the end of the well was drilled, the reservoir section was found to be flat in this area and the water was in fact 20 feet TVD below the entire high angle section. A geologic sidetrack was then required to place a new bore higher up in the section to displace it from the water. The entire sand section of the original bore has been plugged with cement from the TD of 13,225' MD to 11325' MD. A densified kick-off plug has been laid from 11,000' MD to 10,700' MD. Planned kick-off point is 10,800' MD. The new bore will fie 100' to the north of the Original. From a plan view, the Kuparuk penetration is 105' from the original, and the TD's of each well are 241' apart. Please note the attached directional sketches. The new bore will have a 7" intermediate string top-setting the Kuparuk with a 6" production bore completed with a 4 1/2" solid cemented liner. Please call me at 564-4191 if more information is needed, or you have any questions. AUG 2 3998 0ii & Gas Co~s. C0rnmi~[0~ Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-04 6t50 ' 5BSO - '1 , Shared Services Drilling t DrillQue~t: PRELJ 'JN, y Scale: ti.ch = 300f~ Eastings .9~)0 -sl)o -.312o ? 3~0 C/.rcA~ MD, 8935.00ft 'I'VD Circle Decrease @ MD, 8935.00ft Decrease O ,0.000°/'~0ft: 11568.35ft MD, 8935.001t 1~459.96fl: MD, 8925.55ff TVD I i -1500 -1200 Scale: linch = 30Oft 1 -900 I Easlings I .300 I 0 300 Reference is Thio North · s~so~ Sail ~ ~D.000°: 11032.47ff MD, ee51.3~ I! R~LtO Ir~']ease @ 9.000°/100ft: StNrt Dlr @ 8.000°/lOOft: Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-04 Shared Services Drilling I DrillQue~t' 48o0 6000 S2oo 5400 5600 $800 600l~ 5cal~. linch -- 200fl Vertical Section 6200 6400 Section A=im.th~ 348.576' (True North) MEMORANDUM ... TO: David John~ Chairman--~-' State of Alaska Alaska Oil and Gas Conservation Commission DATE: August 15, 1998 THRU: Blair Wondzell, P. I. Supervisor FROM: Lou Grimaldi, ~?'~ SUBJECT: Petroleum Inslbector FILE NO: A22JHNFE.DOC BOP Test, Nabors 33E Arco P2-04 Point Mclntyre Field PTD #98-0156 Friday, August 14, 1998; I witnessed the initial BOP test on Nabors rig #33E drilling Arco well P2-04 in the Point Mclntyre Field. I arrived to find the rig ready to test and we began immediately. The test went very well with all equipment being tested properly and holding its pressure test. I noticed during the test that there was a Blind flange that was tapped and bull plugged with a ½ plug below the bottom pipe rams. In addition a 1502 hammer union was used to connect the kill line to the BOP stack. Danny Hebert (Nabors Toolpusher) advised me that his new kill line is in town and will have the new hubbed ends welded on and installed shortly. Dan agreed that the threaded flange below the rams was in a bad spot and began searching for a replacement blind flange. I also noticed that the sensor point on the choke manifold did not have a isolating valve below it. This, in effect, places three threaded connections and three 1502- hammer unions in direct connection with the choke line. I spoke with Dan about it and was informed that it had been approved. ! will look into this and return to this rig with a answer by my next hitch. SUMMARY: The weekly BOPE test I witnessed on Nabors rig #28E revealed the following; Test time 4 hours, No Test Failures. Three non-compliance's in equipment configuration Attachments: A22JHNFE.XLS, 33ESTAK1.JPG, 33ESTAK2.JPG, 33ESTAK3.JPG CC; (Shared Services Drilling) NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X' Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial P Workover: Nabors Rig No. 33E PTD # Arco Rep.: P2-04 Rig Rep.: Set @ Location: Sec. Weekly Other DATE: 8/14/98 98-0156 Rig Ph.# 659-4791 FAX4790 Kirk White Danny Hebert 11 T. 12N R. 14E Meridian Umiat TEST DATA~ MISC. INSPECTIONS: Location Gen.: P Housekeeping: P (Gen) PTD On Location P Standing Order Posted P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Well Sign P Drl. Rig P Hazard Sec. P Quan. Test Press. P/F 1 250/2500 P I 250/5, 000 P 1 250/5,000 P 1 25O/5, OOO P 1 250/5,000 P 2 250/5,000 P 1 250/5, 000 P N/A 250/5, 000 N/A MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quan. Pressure P/F I 250/5,000 P 250/5, 000 250/5,000 1 P I 250/5, 000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 12 250/5,000 P 32 250/5,000 P 1 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: Four Bottles 2,950 I P 1,500 P minutes 34 sec. minutes 56 sec. P Remote: P 2100 average Psig. TEST RESULTS Number of Failures: ,Test Time: 4.0 Hours. Number of valves tested '/8 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279.1433 REMARKS: Distribution: orig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X' NO Waived By: Witnessed By: Lou Grimaidi Fl-021L (Rev. 12/94) A22jhnfe.xls TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August 7.1998 Lowcll Crane Drilling Engincering Supcrvisor ARCO Alaska. Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point McIntvre P2-04 ARCO Alaska. Inc. Permit No: 98-156 Sur. Loc.: 41'NSL. 1018'EWL. Sec. 11. T12N. R14E. UM Btmhole Loc: 1034'NSL, 4594'EWL, Sec. 3, T12N, R14E. UM Dear Mr. Crane: Encloscd is the approved application for permit to drill the above referenced well. Thc pcrmit to drill docs not cxcmpt you from obtaining additional permits required by lax',' from othcr governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Your diverter waiver request is approved. Blowout prcvention cquiplnent (BOPE) must be tcstcd in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of thc Commission may witness the test. Noticc may be given bx.' contacting the Commission petroleum field inspector on the North Slope pagcr at 659-3607. Chairmar~'-~_~j ~ BY ORDER OF THE COMMISSION dlt;enclosures cc: Department of Fish & Game. tlabitat Section w,o encl. Department of l:.nviromnental Conservation w.o encl. .. . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM~SSION PERMIT TO DRILL 20 AAC 25.005 DIVERTER WAIVER REQUESTED fla. Type of work [] Drill [] Redrill Jlb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenJ [] Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RTE = 49' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL034622 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 41' NSL, 1018' EWL, SEC. 11, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 388' NSL, 827' EWL, SEC. 2, T12N, R14E, UM P2-04 At total depth 9. Approximate Spud date Amount $200,000.00 1034' NSL, 4594' EWL, SEC. 3, T12N, R14E, UM 08/08/98 12. Distance to nearest pro.p, erty line113. Distance to nearest well 14. N~mber of acres in property 15. PropOsed depth (MD and TVD) . A .DL365548, 686 . P2-03, 3.39' at 900' . .. 2555 13329' MD / 9190' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off DePth 600' MD Maximum Hole Angle 87° Maximum surface 3489 psig, At total depth (TVD) 8800' / 4369 p,sig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVE~" (include stage dat. a).. 30" 20" 133# H-40 BTC 80' 49' 49' 129' 129' 260 sx Arctic Set (Approx.) .. 12-1/4" 9-5/8" 40# L-80 BTC-Mod 5174' 48' 48' 5222' 4949' 1550 sx Coldset III, 392 sx'G' 8-3/4" 7" 26# L-80 BTCM 11297" 47' 47' 11344' 8904' 523 sx Class 'G' 8-3/4" 7" 29# 13CR BTCM 1985' 11344' 8904' 13329' 9190' , , ,, , 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate i~ ;? ~ i~ ~ ~.~ Production ~\' ~ %"- ~'~ ¢[ ? Liner .~i['~,.. '~ ic~nc~ Alaska 0il & Gas Cons. Perforation depth: measured Anchorage true verticalDUPLICATE 20. Attachments [] Filing Fee [] Property Plat [L'I'BOP Sketch [] Diverter Sketch [] Drilling Program . . [] Drilling Fluid Program [] Time ~v,s-j~)~epth PIct [].Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact £n~tnoor Namo/Nomber: Grog Hobbs, $~4-4 ~ ~ ~ Prepared By Name/Nombor: G~rol l/Vithoy, ~#-4 ~ 21. I hereby certify that the l~re§oing is true an~ correct to the best of my know~edge Signed 'J __ _/~ Lowe,, Cra.e~,k~/ ¢:¢.4 .¢D'~' ./¢/~l..~-~.---'----'-~¢itle Drilling Engineering Supervisor Date ~ -(¢"~ ~'~ , ~,~ Commission Use Only . rm,t.um r ' A.,Num er ' ~','~-/'~'"~' I 50- O ~-. ~' - ~ ~-- ~c::~ .~ I - -.- for other requirements Conditions of Approval: Samples Required I--lYes ~'No Mud Log Required []Yes lJ~]No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required ~'Yes [] No Required Working Pressure for DOPE [] 2M; [] 3M; ,~LSM; [] 10M; [] 15M Other: Llflgll'lal ~iy!i,-,~... by order of Approved By David W. J0hnst0r, Commissioner the commission Date ~'-' ..... ~ ,n~ c~,~,, 1,~_n~_n~ Submit In Triplicate STATE OF ALASKA ALASKA ~...~L AND GAS CONSERVATION COM,~,ISSION PERMIT TO DRILL 20 AAC 25.005 DIVERTER WAIVER REQUESTED la. Type of work [] Drill I--I Redrill lb. Type of well [-I Exploratory I--I Stratigraphic Test [] Development Oil [-I Re-Entry [] Deepen [-IService [] Development Gas [] Single Zone F-I Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) i10. Field and Pool ARCO Alaska Inc. Plan RTE = 49' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL034622 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 41' NSL, 1018' EWL, SEC. 11, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 388' NSL, 827' EWL, SEC. 2, T12N, R14E, UM P2-04 At total depth 9. Approximate spud date Amount $200,000.00 1034' NSL, 4594' EWL, SEC. 3, T12N, R14E, UM 08/08/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL365548, 686'I P2-03, 3.39' at 900' 2555 13329' MD / 9190' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 600' MD Maximum Hole Angle 87° Maximum surface 3489 psig, At total depth (TVD) 8800' / 4369 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# H-40 BTC 80' 49' 49' 129' 129' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 5174' 48' 48' 5222' 4949' 1550 sx Coldset III, 392 sx 'G' 8-3/4" 7" 26# L-80 BTCM 11297" 47' 47' 11344' 8904' ~523 sx Class 'G' 8-3/4" 7" 29# 13CR BTCM 1985' 11344' 8904' 13329' 9190' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production LinerRECEIVED AU 5. 1998 Perforation depth: measuredORIGINAL Alaska 0il & Gas C0ns. C0mmiss[~ true vertical Anchorage '20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diver[er Sketch [] Drilling Program [] Drilling Fluid Program []Timev..%D~epth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 ¢ ,~_~.'/~ .X~ Prepared By Name/Number: Carol Withey, 564-4114 21. I hereby certify that the Jforegoing is true ~'~'/correct to the best of my knowledge Signed v/c~/~ ~ ///"¢~/1 ~te Drilling Engineering Supervisor Date ~--(.('.-~¢~ Lowell Crane~ Commission Use Only Permit Number APl Number I Approval Date.,, See cover letter ~;~;~'-',~,¢-~' 50- o~.~.-- 2_~. ~:::~I (~- ~.--~'~) for other requirements Conditions of Approval: Samples Required []Yes []No Mud Log Required []Yes ,~ No Hydrogen Sulfide Measures 'J~Yes [] No Directional Survey Required J;;L~lYes'l-lNo Required Working Pressure for BOPE [-12M; []3M; [~5M; [--I10M; []15M Other: Approved By Original Signed By by order of n...,;,~ ,f~' Inhnefnn Commissioner the comrnission Date,..- __-- ,. c,, Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: I P2-04 I I Type of Well (producer or injector): I Producer Surface Location: 41' FSL, 1018' FWL, T 12N, R 14E, S 11 Target Location' 388' FSL, 827' FWL, T 12N, R 14E, S 2 Bottom Hole 1034' FSL, 4594' FWL, T 12N, R 14E, S 3 Location: I AFE Number: 12B0215 I I Rig: I NABORS33E Estimated Start 8/8/98 I Days to complete 19 Date: I IMD: 113329' I IT VD.' 19190' I IRTE: 149-0 I Well Design (conventional, slimhole, etc.): Ultra-Slimhole 7" Longstring, 4-1/2" 13 Cr I tbg I Formation Markers: Formation Tops MD 'rVD Base of 1787 1784 Permafrost SV4 3777 3718 SV1 (-1'3) 4921 4695 9 5/8" Casing 5222 4949 9-5/8" csg shoe below SV1 & above Point K-15 K15 (Ugnu) 5441 5130 West Sak 8133 6955 9,5 ppg minimum mud weight required. HRZ/K-10 11240 8882 K-10/HRZ same depth. 9.6-9.9 EMW to this depth. 3% 10.5 ppg KCI GEM System at 500' ABOVE K-10. 10.5 for the 77 degrees in the HRZ. Kalu bik 11425 8922 Kuparuk 11644 8954 OWC 13189 9118 TD 13329 9190 140' Md Below the OWC. ~;aslng/lumng Fro(,ram: Hole Csg/Tbg Wt/Ft Grade Conn Length Top B;tr~k~ Size O,D, MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 49/49' 129 '/129' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 5174' 48/48' 5222'/4949' 8 3/4" 7" 26# L-80 BTCM 11297' 47/47' 11344'/8904' 8 3/4" 7" 29# 13 Cr BTCM 1985' 11344'/8904' 13329'/9190' Tubing 4 1/2" 12.6# 13 Cr NSTC 11498' 46'/46' 11544'/8942' & Gas Cons, Commission .&nchorage Mud Program: Surface Mud Properties: Spud 112 1/4" hole Density (ppg) ~Funnel Vis Yield Point 10 sec gel 10 min gel pH 8.7-9.5 ! 100-300 30-70 20-60 40-80 9-10 Fluid Loss 15 - 25cc LSND 18 3/4" hole section Production Mud Properties: Density (ppg) Funnel Vis lYield Point 10 sec gel I10 min gel 8.8-9.9 40-55I 18-22 5-15I < 30 pH Fluid Loss 9.0-9.5 4-6cc Production Mud Properties: 3% KCL 18-3/4" hole section, GEM Density (ppg) Plastic Vis Yield Point 10 sec 110 min gel I gel 10.5 8-15 15-25 8-15 < 30 pH 9.0-9.5 Fluid Loss <5cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage job: casing 571/12.2/1.92 (assumes 200% First stage Coldset III lead to 5222'. excess in from 2000'-4334' @ 50% ES cementer Class G'. permafrost) excess followed by Class @ at 2000' 392/15.8/1.15 G tail from shoe to 4334' MD. (750' TVD) @ 50% excess + 80' shoe. . Second stage Coldset III circulated to surface. Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/Wt/Yield Comments 7" none 523/15.8/1.19 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 80' shoe. Logging Program: I Open Hole Logs: I Cased Hole Logs: 12 1/4" MWD/multi-shots as needed for directional survey. MWD/LWD GR/RES to 500' above K-10. MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if requested. GR/CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. It is requested that the diverter be waived for this well. The diverter would point at Manifold buildings or other wells with the design of N-33E. There has never been any surface gas reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues. BOPE and drilling fluid system schematics are on file with AOGCC. Directional: [~r ~ KOP: Maximum Hole Angle: Close Approach Wells: 600' MD 87 degrees P2-03 3.39' Allowable Deviation at 900' P2-10 Risk Based Un-perfed Close Approach (SI). Can be perforated after well P2-04 is past 8900' MD. Drilling and Completion Scope 1. Move rig to P2-04. NU riser and flowlines. 2. Drill 12-1/4" surface hole to ~ 5222' MD. 3. Run and cement 9 5/8" casing. Cement to surface. 4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar. 5. PT casing to 3000 psi for 30 min. Record on chart. 6. Drill out 20', perform LOT. Record on chart ?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo BHA. Swap to 10.5 PPG 3% KCI/GEM system on this trip. 8. Drill 8-3/4" production hole to 13329' MD. Rock Bits are available if the PDC bits will not make the build and turns required to hit the target. 9. Perform a Wiper Trip. 10. Circulate and Condition Mud, POOH to Run 7" Longstring. 11. Run/cement 7" long string. 12. Circulate well to kill weight filtered brine. Perforate via DPC guns. 13. Kill well, Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"xl" GLMs. 14. Secure well, RDMO. Drilling Hazards/Contingencies · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4369 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The 10.5 ppg mud will overbalance the anticipated pressure by 435 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing Gumbo problems. · Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH O8/4/98 J~UL--'30-98 THU 10:16 ~M SPERRY-SUN ~L~$K~ ..~ F~× NO, i9075635754 . . P, 02 DrillQuesf 1200 ~P .' Start Dtr O 1,000°/t0011: 600.00~1 MD, 800,00fl TVD Rata Increase {} 1,500°/t00lI: 900,0011 MD, 899.86ftTVD End DIr Sail e 6,000': 1105.98tt MD, 1t05,18ft TVD Start DI~ O 1.500'/10011: 1165.98ft MO, 1164.8611TVD Rate Decrease O 1.000°/f00ft: 1388,7611 MD, 1388,94[t TVD OIr, Sail ~ 0,000°: 1888.76ft MD, 1686,801t TVD , DIr .t}. 1,1150~1 t, O0lt-:. 1 ~13.1.08/t MD,.$ 9Ol3,00[t.'DJ.D ......................................... .8~e Perm~frd~r. l?&t.50 TVD 24OO Rale Increase ~ 1.500°/100fl; 2701,96ft MD, 2695.94fiTVD e 1,000°/100[I: 3433.~1)ft MD, 8400,00[i TVD Increase 2.~0'/'lOOft: 3540.30ft MD, 3S00.00ftTVD 3600.00 .~3600 ,*~ '$V¢ IF~rirrmte]. 3718.60 3"VD ~' ~. /End Olr, Sail · 32,410': ~O~,4~l MD, 40~,~R WO .~ .o"~'-''~ .............................................................................. ~.~ ~ ~,~ ~....~,~ ~ .oox ........................... ~ ...................................................................... U~A (X-15) - 5129.60 ~D 5~o.o0 ~BHA Tendency · 0.~00'/100ff: 5817.~t MD, ~05.B6{I ~D 6~0,00~ ~00.~ ~ 6000 -~ osoo.~ 7~0.~ ~ ~ooo.~% ................................................. ~ ............................. W~I ~ - ~5~.~0 ~D ................................................................... ~2.~.~-- ........................ ~ co~w//~ I~.'~o . ~,~o ~D 7200 SSOO.~~ ~.~ Start Dlre 6.0~'/1~ ', 10276.~ MD, ~07.~3f~ ~D 8~0 -- "' i 'I I I 0 ~200 2~0 3800 Scale; ~lnch ~ ~20ffi Ve~ical S~ct~o~ Section ~lm~h~ 3~7~' (True No~h) *~8700 - 9300 -- ,~ / End Olr, Sail ~ 77,500': 11239,7611 MD, 8881,60i1TVD ' ~ / / Start DIr · 6,000'/100fl: 11424.57t'1 MD, 8921.6OftTVD . d~ Start 12788.07{t MD, 9013.~0f[ TVD ................................ / ......................... CM.~ (~.1o,~//~RZ · ~/.~ TV/.)''~'~' ' ~ ====================================================================== ...... /'2.~' r2. Ctrl:h~ ,~qJ .,z."J~' ~..' .,r,,~ ~ ........................... wa ,~'r,,~ : ',f~n.'rz ~ 'rz,t~.~ ~v ' ~ ..... ~ .....',,'~"n~ ................. ~oc . ~ ~ ~7.~ Wp ~5~~- )~ T~t¢ Dep~: 1~28.B3ft MD, 91~.~fl ~D ~ 7 Uner- 13828,83 MD, 9190,40 WD ........................................................................................................... Miluvench , 9379.60 TVD I i I T I 4500 5100 5700 6300 6900 Scale: linch = 600ft Vertical .Section Section Azimuth; 344.746' (True North) J'UL-30-98 THU 10:16 al~ SPERRY-SUN aLaSKa FaX NO, 19075635754 P, 03 DrillQuesf 7000 - 6000 - 5000 ' 4000 - :~03000 - 2000 - 1000 - ;: O' o I" Scale: linch = lO00ft -3900 Eastings '"9°°!.9°o I.,.,,, , OlOO _ 7" Liner- 1332~.83 MD, 9190,4 D P2.F ~. Circl, 9013.60 TVD - 6074, 68 N, 1245. 68 W d DIr, Sail ~ 87.~40: 11676,0711 MD, 8955.59[t ~D 6.0~'/1~[t: 1 t424.57~ MD, 8921.80[t ~D S~I e 77.5~~: 11239.7~l MD, 8~.6~t TVD P2-F T1 - Circle 8955.60 ~D - 5640.30 N, 245.92 W Dlr · 6.000"/100fl: 10276.$211 MD, 8407.92 83C 49O0 Tendency · 0,100°/100~: 5817,60[I MD, 6405,861l DIre 3,000°/10Oft: 6282,90tt MD, 5000,00/I TVD 9 5/8' Casing- 5222.02 MD, 4948,60 TVD ReP: 8tad DIr O 1,000'/10011: 600,00it MD, 600,O0[t TVD DIr Rate Inc~ase 0 1,500'/lO0ft: g00,0Oft MD, 8gg,86flTVD .... Er~d Dlr, Sail · 6.000°: 1t06.98~t MD, 1105.18[t TVD Stad DIre 1,500°/100rl; 1165,g811 MD, 1164,86fl 'T'VD Olr Rate Decrease ¢~ 1.000"/10011.: 1385.76fl MD, 1386,94[I TVD End DIr, Sail Q 0,000°: 1685,76fl MD, 1686.80ft'l'VD" I l' I -3000 '2000 't000 Scale: linch = lO00ft Eastlngs DIt, Sail Q 32.410': 40g8.40ft MD, 4000.00ft 'rvo Hate Increase O ~,850'/1001'~: 3540.30fl MD, 3500.00fl TV FormaUon Tendency ~ 1.000'/1OOlt: 34~8.§0ft MI:), 3400.00fl 1 .[00'/100It: 2701.gSft MD, 2egS.g4fl TV[: Dlr Q ~.~50'/lO0fl: lgOl.gSll MD, lg00.00f! 'I'VD t000 20O0 Reference Is True North - 7000 - 6000 - 5000 - 400O - 3000 0 - 2000 'VD -- 1000 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sperry-Sun Drilling Services Sub-Sea Vertical Local Coordinates Depth Depth Northings Easfings (ft) (ft) (ft) (ft) 0.00 0.000 0,000 -48.60 0.00 100.00 0.000 0.000 51.40 100.00 200.00 0.000 0.000 151.40 200.00 300.00 0.000 0.000 251.40 300.00 400.00 0.000 0.000 351.40 400.00 500.00 0.000 0-000 451.40 500.00 600.00 0.000 0.000 551.40 600.00 700.00 1.000 200.000 651.39 699.99 800.00 2.000 200.000 751.36 799.96 900.00 3,000 200,000 851.26 899.86 1000.00 4.441 206-537 951.05 999-65 1100.00 5.912 209.853 1050.64 1099.24 1105.98 6.000 210.000 1056.58 1105.18 1165.98 6.000 210.000 1116.26 1164.86 1200.00 5.517 211.630 1150.11 1198.71 1300.00 4.133 218.596 1249.75 1298.35 1388.76 3.000 230.000 1338.34 1386.94 1400.00 2-888 230.000 1349.56 1398.16 1500.00 1.888 230.000 1449,48 1498.08 1600.00 0.888 230.000 1549.45 1598.05 1688.76 0.000 0.000 1638.20 1686.80 1700.00 0.000 0.000 1649.44 1698.04 1786.56 0.000 0.000 1736.00 1784.60 1800.00 0,000 0.000 174-9.44. 1798.04 1900.00 0.000 0.000 1849.44 1898.04 1901.96 0.000 0.000 1851.40 1900.00 2000.00 1.226 15.000 1949.43 1998.03 2100.00 2.476 15.000 2049.38 2097.98 2200.00 3.726 15.000 2149.23 2197.83 2300.00 4.976 15.000 2248.94 2297.54 Proposal Report for P2-04 (F) Wp2 0.o0 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.82 S 0.30 W 3.28 S 1.19 W 7.38 S 2.69 W 13.30 S 5.31 W 21.23 S 9.60 W 21.77 S 9.91 W 27.20 S 13.05 W 30.13 S 14.80 W 37.04 S 19.57 W zt1.04 S 23.34 W 41.41 S 23.78 W 44.09 S 26.97 W 45.64 S 28.83 W 46.08 S 29.35 W 46,08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 45.07 S 29.08 W 41.95 S 28.25 W 36.73 S 26.85 W 29.40 S 24.88 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100n) (ft) 5998617.32 N 681252.66 E 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252_66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998616.49 N 681252.38 E 1.000 -0.71 5998614.01 N 681251.55 E 1.000 -2.85 5998609.88 N 681250.15 E 1.000 -6.41 5998603.89 N 681247.67 E 1.500 -11.44 5998595.86 N 681243.57 E 1,500 -17.96 5998595.32 N 681243.28 E 1.500 -18.39 5998589.81 N 681240.27 E 0.000 -22-81 5998586.84 N 681238.60 E 1.500 -25.18 5998579.81 N 681234.00 E 1.500 -30.59 5998575.73 N 681230.32 E 1.500 -33,45 5998575.35 N 681229.89 E 1.000 -33.69 5998572.59 N 681226.76 E 1.000 -35.44 5998570.99 N 681224.95 E 1.000 -36.45 5998570.54 N 681224.43 E 1,000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998571.56 N 681224.68 E 1.250 -35.83 5998574.70 N 681225.44 E 1.250 -33.04 5998579.95 N 681226.71 E 1.250 -28.37 5998587.32 N 681228.50 E 1.250 -21.82 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment KOP' Start Dir @ 1.000°/100ft- 600.00ft MD, 600.00ft TVD Dir Rate Increase @ 1.500°/100ff: 900.00ft MD, 899.86ff TVD End Dir, Sail @ 6.000° ' 1105.98ft MD, 1105.18ft TVD Start Dir @ 1.500°I100ft- 1165.98ft MD, 1164.86ft TVD Dir Rate Decrease @ 1.000°/100ft' 1388,76ft MD, 1386.94ft TVD End Dir, Sail @ 0.000°' 1688.76ft MD, 1686.80ft TVD Base Permafrost Start Dir @ 1.250°/100ft- 1901.96ft MD, 1900.00ff TVD Continued... 29 July, 1998- 13:34 - 1- DriliQuest Shared Services Drilling Point Mcintrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 2400.00 6.226 15.000 2348.46 2397.06 2500.00 7.476 15.000 2447.75 2496.35 2600.00 8.726 15.000 2546.75 2595.35 2700.00 9.976 15.000 2645.42 2694.02 2701.96 10.000 15.000 2647.34 2695.94 2800.00 11.464 14.273 2743.67 2792.27 2900.00 12.959 13.698 2841.40 2890.00 3000.00 14.456 13.241 2938.55 2987.15 3100.00 15.952 12.868 3035.05 3083.65 3200.00 17.450 12.557 3130.83 3179.43 3300.00 18.948 12.295 3225.82 3274.42 3400.00 20.446 12.069 3319.97 3368.57 3433.60 20.949 12,000 3351.40 3400.00 3500.00 20.285 12,000 3413.55 3462.15 3540.30 19,882 12.000 3451.40 3500.00 3600.00 21.220 11.681 3507.30 3555.90 3700.00 23.464 11.224 3599.78 3648.38 3777.06 25.193 10.925 3670.00 3718.60 3800.00 25.708 10.843 3690.71 3739,31 3900.00 27.953 10.519 3779.94 3828,54 4000.00 30.199 10.240 3867.33 3915.93 4098.40 32.410 10.000 3951.40 4000.00 4100.00 32.410 10.000 3952.75 4001,35 4155.96 32.410 10.000 4000.00 4048.60 4200.00 32.410 10,000 4037.18 4085.78 4300.00 32.410 10.000 4121.60 4170.20 4400.00 32.410 10.000 4206.02 4254.62 4500.00 32.410 10.000 4290.45 4,339.05 4600.00 32.410 10.000 4374.87 4423.47 4700.00 32.410 10.000 4459.30 4507.90 Proposal Report for P2-04 (F) Wp2 19.97 S 22.36 W 8.45 S 19.27 W 5.16 N 15.62 W 20.85 N 11.42 W 21.18 N 11.33 W 38.85 N 6.73 W 59.37 N 1.62 W 82.42 N 3.89 E 107.97 N 9.81 E 136.00 N 16.13 E 166.50 N 22.85 E 199.44 N 29.96 E 211.06 N 32.44 E 233.93 N 37.30 E 247.46 N 40.18 E 267.97 N 44.47 E 305.23 N 52.01 E 336.38 N 58.11 E 346.06 N 59.97 E 390.42 N 68.33 E 438.22 N 77.08 E 488,54 N 86.06 E 489.39 N 86.21 E 518,93 N 91.42 E 542.17 N 95.52 E 594.95 N 104.82 E 647.74 N 114.13 E 700.52 N 123.44 E 753.30 N 132.75 E 806.09 N 142.05 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (St) (ft) (°/'~OOft) (ft) 5998596.81 N 681230.79 E 1.250 -13.39 5998608.40 N 681233.60 E 1.250 -3.08 5998622.10 N 681:236.91 E 1.250 9.09 5998637.89 N 681240.74 E 1.250 23.12 5998638.22 N 681240.82 E 1.250 23.41 5998655.99 N 681244.99 E 1.500 39.25 5998676.64 N 681249.60 E 1.500 57.71 5998699.81 N 681254,55 E 1.500 78.49 5998725.49 N 681259.85 E 1.500 101.58 5998753.67 N 681265.49 E 1.500 126.96 5998784.32 N 681271.47 E 1.500 154.62 5998817.43 N 681277.77 E 1.500 184.53 5998829.10 N 681279.97 E 1.500 195.09 5998852.08 N 681284.27 E 1.000 215.87 5998865.68 N 681286.82 E 1.000 228,17 5998886.29 N 681290.62 E 2.250 246.83 5998923.72 N 681297.25 E 2.250 280.79 5998955.01 N 681302.59 E 2.250 309.24 5998964.74 N 681304,22 E 2.250 318.09 5999009.28 N 681311.50 E 2.250 358.68 5999057.28 N 681319.09 E 2.250 402,50 5999107.81 N 681326.85 E 2.250 448,69 5999108.66 N 681326.97 E 0.000 449.46 5999138.31 N 681331.46 E 0.000 476.59 5999161.65 N 681335.00 E 0.000 497.94 5999214.64 N 681343.02 E 0.000 546.41 5999267.64 N 681351.05 E 0.000 594.89 5999320.63 N 681359.07 E 0.000 643.36 5999373.62 N 681367.09 E 0.000 691.84 5999426.61 N 681375.12 E 0.000 740.31 Alaska State Plane Zone 4 Point Mcintyre Pad 2 Comment Dir Rate Increase @ 1.500°/100ft· 2701.96ft MD, 2695.94ff TVD Formation Tendency @ 1.000°/100ft: 3433.60ft MD, 3400.00ft 'i'VD Dir Rate Increase @ 2.250°/100ff: 3540.30ft MD, 3500.00ff TVD SV4 [Estimate] End Dir, Sail @ 32.410° ' 4098.40ft MD, 4000.00ff 'I'VD Top Stuck Pipe Zone Continued... Cs..) I X 29 July, 1998 - 13:34 - 2 - DrillQuest . Shared Services Drilling Point Mclntrye Measured Depth Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) 4800.00 32.410 10.000 4543,72 4592.32 4900.00 32.410 10.000 4628.14 4676.74 4921.15 32.410 10.000 4646.00 4694.60 5000.00 32.410 10_000 4712.57 4761.17 5100.00 32.410 10,000 4796.99 4845.59 5103.57 32.410 10.000 4800,00 4848.60 5200.00 32.410 10.000 4881.41 4930.01 5222.02 32.410 10.000 4900.00 4948.60 5282.90 32.410 10.000 4951.40 5000.00 5300.00 32.921 9.911 4965.80 5014.40 5400.00 35.908 9.435 5048.28 5096.88 5440.71 37.125 9.260 5081.00 5129.60 5500.00 38.898 9.022 5127.71 5176.31 5600.00 41.889 8.660 5203.87 5252.47 5700.00 44.881 8.338 5276.53 5325.13 5800.00 47.873 8,048 5345,52 5394,12 5817.60 48.400 8.000 5357.26 5405,86 5900.00 48.372 7.897 5411.98 5460.58 6000,00 48.337 7,771 5478.44 5527.04 6100,00 48.303 7.645 5544.93 5593.53 6200.00 48.269 7.519 5811.48 5660.08 6300.00 48.235 7.393 5678.06 5726.66 6400.00 48.201 7.267 5744.69 5793.29 6500.00 48.167 7.141 5811.36 5859.96 6600.00 48.134 7.014 5878.08 5926.68 6700.00 48.101 6.887 5944.84 5993,44 6800.00 48.067 6.761 6011.65 6060,25 6900.00 48.034 6.634 6078,49 6127.09 7000.00 48.001 6,507 6145.38 6193.98 7100.00 47,968 6.380 6212.32 6260.92 Proposal Report for P2-04 (F) Wp2 858.87 N 151.36 E 911.65 N 160.67 E 922.82 N 162.64 E 964.43 N 169.97 E 1017.22 N 179.28 E 1019.10 N 179,61 E 1070.00 N 188.59 E 1081.62 N 190.64 E 1113.76 N 196.30 E 1122.85 N 197.90 E 1178.56 N 207.38 E 1202.46 N 211.32 E 1238.51 N 217.12 E 1302.53 N 227.07 E 1370.46 N 237.22 E 1442.10 N 247.53 E 1455.08 N 249.36 E 1516.10 N 257.88 E 1590.13 N 268.06 E 1664,14 N 278.08 E 1738.13 N 287.93 E 1812.11 N 297.61 E 1886.07 N 307.12 E 1960.01 N 316.47 E 2033.93 N 325.65 E 2107,84 N 334.66 E 2181.72 N 343,50 E 2255.59 N 352.17 E 2329.43 N 360,68 E 2403.26 N 369.01 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/~ 00ft) (~t) 5999479.61 N 681383.14 E 0.000 788.78 5999532.60 N 681391.17 E 0.000 837.26 5999543.81 N 681392.86 E 0.000 847.51 5999585.59 N 681399.19 E 0.000 885.73 5999638.59 N 691407.21 E 0.000 934.21 5999640,48 N 681407.50 E 0.000 935.94 5999691.58 N 681415.24 E 0.000 982.68 5999703.25 N 681417.00 E 0.000 993.35 5999735.51 N 681421.89 E 0,000 1022.87 5999744.64 N 681423.26 E 3,000 1031.22 5999800.56 N 681431.40 E 3.000 1082.47 5999824.55 N 681434,75 E 3.000 1104.49 5999860.73 N 681439.67 E 3.000 1137.75 5999924.98 N 681448.07 E 3.000 1196.90 5999993.13 N 681456.56 E 3.000 1259.76 6000065.00 N 681465.13 E 3.000 1326.17 6000078.02 N 681466.65 E 3.000 1338,21 6000139.23 N 681473.68 E 0.100 1394.83 6000213.48 N 681482.07 E 0.100 1463.57 6000287.71 N 681490.29 E 0.100 1532.34 6000361.93 N 681498.34 E 0.100 1601.14 6000436.12 N 681506.23 E 0.100 1669.96 6000510.28 N 681513.94 E 0.100 1738,81 6000584.43 N 681521.49 E 0.100 1807.69 6000658.55 N 681528.87 E 0.100 1876.59 6000732.65 N 681536.09 E 0.100 1945.52 6000806.73 N 681543.14 E 0.100 2014.48 6000880.79 N 681550.02 E 0.100 2083.46 6000954.82 N 681556.73 E 0.100 2152.47 6001028.83 N 681563.27 E 0.100 2221.50 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment T-3 ('1-;'6 / SVl) Bottom Stuck Pipe Zone 9 5/8' Casing Start Dlr @ 3.000°/l~10ft: 5282.90ff MD. 5000.00ft TVD UG4A (K-15) BHA Tendency @ 0.100°/100ff: 5817.60ft MD, 5405.86ft TVD Continued... 29 July, 1998 - 13:34 - 3 - DriilQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 7200.00 47.936 6.252 6279.29 6327.89 7300.00 47.903 6.125 6346.31 6394.91 7400.00 47.871 5.998 6413.37 6461.97 7500.00 47.838 5.870 6480.47 6529.07 7600.00 47.806 5.742 6547.61 6596.21 7700.00 47.774 5.614 6614.80 6663.40 7800.00 47.742 5.486 6682.02 6730.62 7900.00 47.711 5.358 6749.29 6797.89 8000.00 47.679 5.230 6816.60 6865.20 8100.00 47.648 5.101 6883.95 6932.55 8132.73 47,637 5.059 6906.00 6954.60 8200.00 47.616 4.973 6951.34 6999.94 8300.00 47,585 4.844 7018.77 7067.37 8400.00 47,554 4.715 7086.24 7134.84 8494.46 47,525 4.593 7150.00 7198.60 8500.00 47.524 4.586 7153.74 7202.34 8600.00 47.493 4,457 7221.29 7269.89 8700.00 47.462 4.328 7288.88 7337.48 8800.00 47,432 4.199 7356.51 7405.11 8900.00 47.402 4.069 7424.17 7472.77 9000.00 47.371 3.940 7491.88 7540.48 9100.00 47,341 3.810 7559.62 7608.22 9200.00 47.312 3.680 7627.40 7676.00 9300.00 47.282 3.550 7695.22 7743.82 9400.00 47.252 3.420 7763,06 7811.68 9500.00 47.223 3.290 7830.98 7679.58 9600.00 47.194 3,160 7896.91 7947.51 9700.00 47,165 3.029 7966.88 8015.48 9800.00 47.136 2.899 8034.89 8083.49 9900.00 47.107 2.768 8102.93 8151.53 Sperry-Sun Drilling Services Proposal Report for P2-04 (F) Wp2 Local Coordinates Northings Eastings (ft) (ft) 2477.07 N 377.18 E 2550.86 N 385.19 E 2624.63 N 393.02 E 2698.37 N 400.68 E 2772.10 N 408_18 E 2845.80 N 415.51 E 2919.49 N 422.67 E 2993.15 N 429.66 E 3066.79 N 436.48 E 3140.41 N 443.14 E 3164.50 N 445.28 E 3214.01 N 449.63 E 3287.59 N 455.94 E 3361.14 N 462.09 E 3430.60 N 467.75 E 3434.67 N 468,08 E 3508.18 N 473.89 E 3581.66 N 479.53 E 3655.13 N 485.01 E 3728.56 N 490.32 E 3801.98 N 495.46 E 3875.37 N 500,43 E 3948.73 N 505.23 E 4022.07 N 509.86 E 4095.39 N 514.33 E 4168.68 N 518.63 E 4241.95 N 522.75 E 4315.19 N 526.71 E 4388.41 N 530.50 E 4461.60 N 534.13 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (ft) (°/'~ OOft) (ft) 6001102.81 N 681569.65 E 0.100 2290.56 6001176.77 N 681575.86 E 0.100 2359.64 6001250.71 N 681581.90 E 0.100 2428.75 6001324.62 N 681587.77 E 0.100 2497.88 6001398.50 N 681593.48 E 0.100 2567.03 6001472.37 N 681599.02 E 0.I00 2636.22 6001546,20 N 681604.39 E 0.100 2705.42 6001620.01 N 681609.59 E 0,100 2774.65 6001693.80 N 681614.63 E 0.100 2843.90 6001767.56 N 681619.49 E 0.100 2913.17 6001791.69 N 681621.05 E 0.100 2935.85 6001841.29 N 681624.19 E 0,100 2982.47 6001915.00 N 681628.73 E 0.100 3051.79 6001988.68 N 681633.09 E 0.100 3121.14 6002058.25 N 681637.06 E 0.100 3186.66 6002062.33 N 681637.29 E 0.I00 3190.50 6002135.96 N 681641.31 E 0.100 3259.89 6002209.56 N 681645.17 E 0.100 3329.30 6002283.13 N 681648.87 E 0.100 3398.73 6002356.68 N 681652.39 E 0.100 3468.19 6002430.20 N 681655.75 E 0.100 3537.66 6002503.69 N 681658.94 E 0.100 3607.16 6002577.15 N 681661.96 E 0.100 3676.68 6002650.58 N 681664.81 E 0,100 3746,22' 6002723.98 N 681667.50 E 0.100 3815.78 6002797.36 N 681670.02 E 0.100 3885.35 6002870.70 N 681672.37 E 0.100 3954.95 6002944.02 N 681674.55 E 0.100 4024.57 6003017.30 N 681676.56 E 0.100 4094.21 6003090.56 N 681678.41 E 0.100 4163.87 Comment West Sak Top Colville [Estimate] Alaska State Plane Zone 4 Point Mclntyre Pad 2 Con#hued... x 29 July, 1998 - 13:34 - 4 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 10000.00 47.078 2.637 8171.02 8219.62 10100,00 47.050 2.506 8239.13 8287.73 ~. ~' -- 10200.00 47.022 2.375 8307.29 8355.89 10276,32 47.000 2.275 8359.33 8407.93 10300.00 47,353 0.398 8375.42 8424.02 10400.00 49.167 352.730 8442.05 8490.65 10500.00 51.459 345.521 8505.96 8554,56 10600.00 54.164 338.795 8566.44 8615.04 10700.00 57.218 332.540 8622.84 8671.44 10800.00 60,562 326.719 8674.53 8723.13 10900.00 64.142 321.281 8720.96 8769.56 11000.00 67.913 316.172 8761.60 8810,20 11 t00.00 71.833 311.333 8796.02 8844.62 11200.00 75,870 306,710 8823.64 8872,44 11239.76 77.500 304,920 8833.00 8881.60 11300.00 77.500 304.920 8846.04 8894.64 11400.00 77.500 304,920 8867.68 8916.28 11424.57 77.500 304.920 8873.00 8921,60 11500.00 80,313 301.307 8887.52 8936.12 11600.00 84.098 296.607 8901.08 8949.68 11644.44 85.794 294.541 8905.00 8953.60 11676.07 87.004 293.077 8906.99 8955,59 11700.00 87.004 293.077 8908.24 8956.84 11800.00 87.004 293,077 89I 3.46 8962.06 11900.00 87.004 293.077 8918.69 8967.29 Proposal Report for P2-04 (F) Wp2 4534.76 N 537.58 E 4607.90 N 540.86 E 4681.01 N 543.98 E 4736.79 N 546.24 E 4754.15 N 546.65 E 4828.52 N 542.11 E 4903.99 N 527.53 E 4979.71 N 503.07 E 5054,87 N 468.99 E 5128.64 N 425.68 E 5200.21 N 373.59 E 5268.81 N 313.31 E 5333.66 N 245.49 E 5394.08 N 170.88 E 5416.72 N 139.50 E 5450.38 N 91.28 E 5506.27 N 11.23 E 5520.00 N 8.44 W 5560.42 N 70.43 W 5608.35 N 157.09 W 5627.46 N 197.02 W 5640.20 N 225.89 W 5649.56 N 247.88 W 5688.71 N 339.75 W 5727.85 N 431.62 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/1O0ft) (ft) 6003163.79 N 681680.08 E 0.100 4233.55 6003236_98 N 681681.59 E 0,100 4303.24 6003310.15 N 681682.94 E 0.100 4372.96 6003365.96 N 681683.85 E 0.100 4426.18 6003383.33 N 681683.83 E 6.000 4442.82 6003457.57 N 681677.49 E 6.000 4515.77 6003532.66 N 681661,09 E 6.000 4592.41 6003607.77 N 681634.79 E 6.000 4671.90 6003682.08 N 681598.90 E 6,000 4753,38 6003754.78 N 681553,81 E 6.000 4835.95 6003825.07 N 681500.00 E 6.000 4918.70 6003892.18 N 681438.07 E 6.000 5000.74 6003955.37 N 681368,70 E 6.000 5081.15 6004013.96 N 681292.65 E 6.000 5159.07 6004035.83 N 681260.73 E 6.000 5189.16 6004068.31 N 681211.71 E 0.000 5234.33 6004122.24 N 681 t30.32 E 0.000 5309.31 6004135.49 N 681110.33 E 0.000 5327.73 6004174.39 N 681047.38 E 6.000 5383.04 6004220.21 N 680959,58 E 6.000 5452.08 6004238.34 N 680919,20 E 6.000 5481.02 6004250.38 N 680890.03 E 6.000 5500.91 6004259.21 N 680867.82 E 0.000 5515,73 6004296.11 N 680775.02 E 0.000 5577.67 6004333.01 N 680682.23 E 0.000 5639.60 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Start Dir @ 6.000°/100ft- 10276.32ff MD, 8407.93ft TVD End Dir, Sail @ 77.500°' 11239.76ff MD, 8881.60ft TVD HRZ Start Dir @ 6.000°/100ft: 11424.57ft MD, 8921.60ft TVD Kaiubik Top Kuparuk End Dir, Sail @ 87.004°- 11676.07ft MD, 8955,59ft TVD Con#hued... x 29 July, 1998- 13:34 - 5- DrillOuest Sperry-Sun Drilling Services Proposal Report for P2-04 (F) Wp2 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (f~) 12000.00 87.004 293.077 8923.92 8972.52 5766.99 N 523.49 W 12100,00 87.004 293,077 8929.14 8977,74 5806.14 N 615.37 W 12200.00 87.004 293,077 8934.37 8982.97 5845.28 N 707.24 W 12300.00 87.004 293,077 8939.60 8988.20 5884.42 N 799.11 W 12400.00 87.004 293.077 8944.82 8993.42 5923.56 N 890.98 W 12500.00 87.004 293.077 8950.05 8998.65 5962.71 N 982.86 W 12600.00 87.004 293.077 8955.28 9003.88 6001.85 N 1074.73 W 12700.00 87.004 293.077 8960.50 9009.10 6040.99 N 1166.60 W 12786.07 87.004 293.077 8965.00 9013.60 6074.68 N 1245.68 W 12800.00 86.168 293.077 8965.83 9014.43 6080.13 N 1258.47 W 12900.00 80.168 293.077 8977.72 9026.32 6119.03 N 1349.77 W 13000.00 74.168 293.077 8999.92 9048.52 6157.23 N 1439.43 W 13066.88 70.156 293.077 9020.40 9069.00 6182.18 N 1497.99 W 13100.00 68.168 293.077 9032.18 9080.78 6194.31 N 1526.46 W 13188.83 62.839 293.077 9069.00 9117.60 6225.99 N 1600.80 W 13200.00 62.168, 293.077 9074.16 9122,76 6229.87 N 1609.92 W 13300.00 56.168 293.077 9125.39 9173.99 6263.51 N 1688.88 W 13328.83 54.439 293.077 9141.80 9190.40 6272.80 N 1710.68 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fl) (°il00ft) (fl) 6004369.92 N 680589.43 E 0.000 5701.54 6004406.82 N 680496.64 E 0.000 5763.47 600~.3.72 N 680403.84 E 0.000 5825.41 6004480.63 N 680311.05 E 0.000 5887.35 6004517.53 N 680218.25 E 0.000 5949.28 6004554.43 N 680125.46 E 0.000 6011.22 6004591.33 N 680032.67 E 0.000 6073.15 6004628,~4 N 679939.87 E 0.000 6135.09 6004660.00 N 679860.00 E 0.000 6188.40 6004665.14 N 679847.08 E 6,000 6197.02 6004701.81 N 679754,86 E 6.000 6258.57 6004737.83 N 679664.30 E 6.000 6319.02 6004761.35 N 679605.16 E 6.000 6358.49 6004772.78 N 679576.39 E 6.000 6377.69 6004802.64 N 679501.31 E 6.000 6427.81 6004806.31 N 679492.10 E 6.000 6433.95 6004838.02 N 679412.35 E 6.000 6487.18 6004646.78 N 679390.32 E 6.000 6501.88 Ail data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 344.746° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13328.83ff., The Bottom Hole Displacement is 6501.88ft., in the Direction of 344.746° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment WOC Total Depth - 13328.83ft MD, 9190.40ft TVD 7" Liner Z9 July, 1998 - 13:34 - 6 - Dril/Quest I Well Name: I P2-04 I l Type of Well (producer or injector): I Producer Surface Location: Target Location: Bottom Hole Location: 41' FSL, 1018' FWL, T 12N, R 14E, S 11 388' FSL, 827' FWL, T 12N, R 14E, S 2 1034' FSL, 4594' FWL, T 12N, R 14E, S 3 I AFENumber: 12B0215 Estimated Start 18/8/98 IDays Date: 3329' I J TVD: 19190' I Rig: I NABORS33E to complete 19 ]RTE: 149.0 Well Design (conventional, slimhole, etc.): IUltra-Slimhole 7" Longstring, 4-1/2" 13 Cr tbg Formation Markers: Formation Tops MD TVD Base of 1787 1784 Permafrost $V4 3777 3718 sV1 (T3) 4921 4695 9 5/8" Casing 5222 4949 9-5/8" csg shoe below SV1 & above Point K-15 K15 (Ugn u) 5441 5130 West Sak 8133 6955 9.5 ppg minimum mud weight required. HRZ/K-10 11240 8882 K-10/HRZ same depth. 9.6-9.9 EMW to this depth. 3% 10.5 ppg KCI GEM System at 500' ABOVE K-10. 10.5 for the 77 degrees in the HRZ. Kalubik 11425 8922 Ku paru k 11644 8954 OWC 13189 9118 TD 13329 9190 140' Md Below the OWC. 1,9.,98 Casing~ubin9 Pro( ram: Hol(~ Cs~/Tbg Wt/Ft Grade Conn Length Top Btm Size O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 49/49' 129 '/129' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 5174' 48/48' 5222'/4949' 8 3/4" 7" 26# L-80 BTCM 11297' 47/47' 11344'/8904' 8 3/4" 7" 29# 13 Cr BTCM 1985' 11344'/8904' 13329'/9190' Tubin¢ 4 1/2" 12.6# 13 Cr NSTC 11498' 46'/46' 11544'/8942' o, Mud Program: Surface Mud Properties: Spud I12 1/4" hole section Density (ppg) ~Funnel Vis I Yield Point 10 sec gel I10 min gel 8.7-9.5 J 100-300 30-70 20-60 40-80 pH I Fluid Loss 9-10 15- 25cc Density (ppg) Funnel Vis Yield Point 10 sec gel 10 min gel 8.8-9.9 : 40-55 18-22 5-15 < 30 pH Fluid Loss 9.0-9.5 4-6cc Production Mud Properties: 3% KCL 18-3/4" hole section, GEM J Density (ppg) Plastic Vis Yield Point 10 sec 10 min pH Fluid Loss ~lel gel 10.5 8-15 15-25 8-15 < 30 9.0-9.5 <5cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/W~ield Sxs/Wt/Yield 9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage iob: casing 571/12.2/1.92 (assumes 200% First stage Coldset III lead to 5222' excess in from 2000'-4334' @ 50% ES cementer Class G:. permafrost) excess followed by Class @ at 2000' 392/15.8/1.15 G tail from shoe to 4334' MD. (750' TVD) @ 50% excess + 80' shoe. ~ Second stage Coldset III circulated to surface. Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/W~ield Comments 7" none 523/15.8/1.19 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 80' shoe. Logging Pro~lram: I Open Hole Logs: ICased Hole Logs: 12 1/4" MWD/multi-shots as needed for directional survey. MWD/LWD GR/RES to 500' above K-10. MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if requested. GR/CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. It is requested that the diverter be waived for this well. The diverter would point at Manifold buildings or other wells with the design of N-33E. There has never been any surface gas reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues. BOPE and drilling fluid system schematics are on file with AOGCC. Directional: KOP: 600' MD Maximum Hole Angle: Close Approach Wells: 87 degrees P2-03 3.39' Allowable Deviation at 900' (S~) P2-10 Risk Based Un-perfed Close Approach (SI). Can be perforated after well P2-04 is past 8900' MD. Drillinq and Completion Scope 1. Move rig to P2-04. NU riser and flowlines. 2. Drill 12-1/4" surface hole to - 5222' MD. 3. Run and cement 9 5/8" casing. Cement to surface. 4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar. 5. PT casing to 3000 psi for 30 min. Record on chart. 6. Drill out 20', perform LOT. Record on chart ?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo BHA. Swap to 10.5 PPG 3% KCl/GEM system on this trip. 8. Drill 8-3/4" production hole to 13329' MD. Rock Bits are available if the PDC bits will not make the build and turns required to hit the target. 9. Perform a Wiper Trip. ]0. Circulate and Condition Mud, POOH to Run 7" Longstring. ! ]. Run/cement 7" long string. ]2. Circulate well to kill weight filtered brine. Perforate via DPC guns. 13. Kill well, Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"xl" GLMs. 14. Secure well, RDMO. Drilling Hazards/Contingencies · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4369 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The 10.5 ppg mud will overbalance the anticipated pressure by 435 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing Gumbo problems. · Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH O8/4/98 TREE.: 4-1/16'~-5M chrome i'2 04 RT-GL=36 WELLHEAD: 11" X 11" - 5M FMC ' -~ ' GL-SL = 12.8'~ Gen 5 Type LU -- 4-1/2" BAL-O 2000 4000' (top 9-5/8", 40#/ft, L-80 I 5222' I giro) ,~ ~' RP Shear in top station. BTC 'KOP: 600' ~ GA8 LIFT MANDREL~ *~ (Camco 4-1/2xl"MMG") , MAX ANGLE: 87° @ 11,676' MD N-O MD(EKE) TVDss u) 1 tbd 2 ,, i 4_1/2,, 12.6# 13 Cr NSCT TUBING 3 II , 4 ii TUBING ID: 3.958" 5 i CAPACITY: 0.01522 BBL/FT 6 II ' 7 40' MD above II packer PERFORATION SUMMARY: Ref Log: i Size Interval SPF Open/Sqzd tbd I ! I --TOP OF CHROME 7"= 11344' L-80 Mod BTC / 13CR NSCT "~ '"'~<~1 -- 7" Packer,9Cr 11514' , , ! _~ 4-1/2"'X' Nipple 11524' .1! !~ - 4-1/2" 'XN' Nipple 11534' %',. 4-1/2" WLEG 11544 ~ 7" CHROME MARKER JOINT (20') ABOVE KUPARUK BUT BELOW TT. 7" shoe at [ 13329' DATE REV. BY COMMENTS Point Mclntyre WELL' P2-04 8/04/98 GH PLANNEDCOMPLET~ON APl NO: 50-029- Shared Services Drilling JUL-30-98 THU 10:15 Aid SP=RRY-SUN ALASKA FAX NO, q075635754 P, 02 I DrillQuest 1200 ,P: Slate D~r O t.000'/t0OIt: 800.00~ MD, 800.00fl I'VD Rate Increase O 1 ,,~0°110011: 900.0011 MD, 81~,88ft I'VD End DIr, Sail O 6.000'; 1105.sell.MD, 1105.18fi 'r'VD Sta~l [N~ ~ 1.500°/1001~: 1165.9811 MD, 1164.88flTVD lit Rate Decrease ~ 1,000Vt00ft: 1388.7811 MD, 1388.94~t'l'VD elf, Sail ~ 0,000': 1688.76fl MD. 1888,601t '}'VP , DIr .~. ! ,2~11. O0tt.:. ~ {3G1..~1M D,,.IgO0.~It.'~/.D ......................................... B~e P~n'~fro~r. 17~4.~0 7'VD 2400 Ra{e Inoreasa 0 1.500°/100ft; 2701.96fl MD, 3695.g4f{TVD .1=3600 Tendenc~ · I,~0'/100tl: 3433.60ft MD, 3400.00t{ TVD lit Rate Increaseo 2.2~0/100ft: 3540.30{1 MD, 3500,00ttTVD 3600.00 ..... . ......................................... SW/~fi~/~]. $7]g.6o I'VD 4000.00 Ssll ~ 32,410': 4098,40fl MD, 4000,00fl TVD , ................................. Top $~ck pipe Zone. 4048.60 TVD 4400,00 4800.00 ,5200,00' cas ns.: .~.2. ~ :0..2. M..D. ,..4.9.4..a.. ~.9...W.p. .................... r-~ em/sv/). 4~.~o ~o 'O/'m' 0 3.1~100ft: "8~ 2.'90ti'MD ? 5000,O0fl ~/'¥D' .................. Bottom Stuck Pipe Zone. 4848.60 TVD .................................................................. UG4A (g.I.'i). 51~9.60 TVO y · 0.~00'/100ft: 5817.60ft MD, .5405.86It 'i'VD 6000 7200 - 8400 - ,~87 0 0 - 9300 - 72oi .................................................................................... W¢,t 8~ . 6954.60 TI/D .......................................................................... ~ ........................ Top ¢olvi//¢/g. rtfmblo] · ~19&60 ~D B800.~ 9~0.~ 9~0.~0 ~ 1~.~,, ~ ~Stad Olr ~ 8,0~"/1~: 10278,3~ MD, ~07,~3ft ~D ' 'I' I 1 I 0 1200 2~0 3600 Scale: linch = 120~ Ve~ical Section Section ~lm~h: 3~7~' (True No~h) ~ / End Dk, Sail ~ ~,5~': lt23g,76E MD, 8881,~[1 ~D ~ / / ~afl Olr · 6.0~'/1~f1:11424.57~1 MD, 8921.~I~D . ~ ~ / / / E~ Dlr, s~mm 0 ~7.~': 11878.07ft M~ .... ....... : ......... · ~". ~x~ ~'~ ....... ; ............ ~ ............................ ro~ ~.0~-~s~,~ ~o ~ wOO 9lip ~ ~o ........................... ~.~ :¥~.~'~.~ ...... ~ ...... :~ ................... ,~m )~ Tot~ Dep~: 1~28.83ft MD, 9~.~1 ~D ~ 7" ~ner - 13328,83 MD, 9190.40 WD ........................................................................................................... Milu~ach . 9379.60 ~o I I I I I ~00 ~ O0 ~7~0 6300 ~900 Scale: linch = 600ff Ve~i~[ .ee¢tiO~ S~tion ~Imuth~ 3~7~' (True No~h) JUL-30-98 THU 10:16 Sr"-RRY-SUN t Ll SKl Ft X NO, '"'075635754 P, 03 DrillQuest Scale:tlnch = lO00ft '3900 7000 -- 6000 - 5000 - 4000 - 000 - 2000 1000 - Eastings 7" Uner- 1332~1.83MD, 9190.4 TVD P2.F T2. Circle 9013, 60 TVD 6074, 68 N, 1245. W ,~lE[[nd Off, Salt O 87.004'; 11070.071t MO, 8955.59(1 -rvo H ~ e 6.000'/lO0ft: 11424.57{1 MD, 8921.80fl TVD ;001 s,q e 77.500°: l t239.76tt MI:), 8881.80tt TVO P2.F TJ . Circle 8955.60 TVD. 5640.30 N, 245.P2 W Dlr · 6.000'/100fl: 10276.32{I MD, M07,9;: Tendency ~ 0,100'/100fi: 5817,60fl MD, 6405.8811 OIr · 3,00~o/10~ft: 6~0;,~4t M~, 50~0.00/1WD 9 5/8' Casing. 5222.02 MD, 4948.60 TVD Olr, Sell · 32,410': 4098.40{t MD, 4000,00fi TVO I -3000 Scale: linch = 1000ft Eastings DIt Rate Increase ~ 2,250'/100[[: 3540,30fl MD, 3500.00lt TVt 3500,00 Formation Tendency O 1.000'/10Oft ', 3433.§0it MD. 3400.00f1 OP..qlad DIr {} 1.000/10011'. 800,0~lt MD ~,00,00ft TVD r e 1.500'/100it: 900.00fl ' r Rate Increase 0 1 -~00/100~t, 2701,98ft MD 2695 941t TVC DI ,Rs. re In.c?~e MD, 899.88ftTVD '~~..~$tarl Dlre 1,250'/10Ofl: 1901.98ft MD, 1900.00'fi TV~' End Olr, Sail e 6.000': 1105.98~1 MD, 1106.t6~t TVD ------~;~- Star{ DIt {~ 1,800'/10011; 1165,98{I MD, 1164,88f[ '/'VD Olr Rate Decrease ~ 1.000'/1001t: 138B,76R MD, 1386,9411TVD/~- [ End Dir, Sa, Il ~ 0.000': 1685.76f1 MD, 1685.80ft TVD /I / I I / I 1 -2000 -1000 0 'lO00 2000 Reference is True North - 7000 - 600O - 5000 ~D -- 40OO - 3000 - 2000 'VD - 1000 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.000 --48.60 0.00 100.00 0.000 0.000 51.40 100.00 200.00 0.000 0.000 151.40 200.00 300.00 0.000 0.000 251.40 300.00 400.00 0.000 0.000 351.40 400.00 500.00 0.000 0.000 451.40 500.00 600.00 0.000 0.000 551.40 600.00 700.00 1.000 200.000 651.39 699.99 800.00 2.000 200.000 751.36 799.96 900.00 3.000 200,000 851.26 899.86 1000.00 4.441 206.537 951.05 999.65 1100.00 5.912 209.853 1050.64 1099.24 1105.98 6.000 210.000 1056.58 1105.18 1165.98 6.000 210.000 1116.26 1164.86 1200.00 5.517 211.630 1150.11 1198.71 1300,00 4.133 218.596 1249.75 1298.35 1388.76 3.000 230.000 1338.34- 1386.94 1400.00 2.888 230.000 1349.56 1398.16 1500.00 1.888 230.000 1449.48 1498.08 1600.00 0.888 230.000 1549.45 1598.05 1688.76 0.000 0.000 1638.20 1686.80 1700.00 0.000 0.000 1649.44 1698.04 1786.56 0.000 0.000 1736.00 1784.60 1800.00 0.000 0.000 1749.44 1798.04 1900.00 0.000 0.000 1849.44 1898.04 1901.96 0.000 0.000 1851.40 1900.00 2000.00 1.226 15.000 1949.43 1998.03 2100.00 2.476 15.000 2049.38 2097.98 2200.00 3.726 15.000 2149.23 2197.83 2300.00 4.976 15.000 2248.94 2297.54 Sperry-Sun Drilling Services Proposal Report for P2-04 (F) Wp2 Local Coordinates Northings Eastings (~) (ft) 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.82 S 0.30 W 3.28 S 1.19 W 7.38 S 2-69 W 13.30 $ 5.31 W 21.23 S 9.60 W 21.77 S 9.91 W 27,20 S 13.05 W 30.13 S 14.80 W 37.04 S 19.57 W ztl.04 S 23.34 W 41.41 S 23.78 W 44.09 S 26.97 W 45.64 S 28.83 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 46.08 S 29.35 W 45.07 S 29.08 W 41.95 S 28.25 W 36.73 S 26.85 W 29.40 S 24.88 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/lOOft) (ft) 5998617.32 N 681252.66 E 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252-66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998617.32 N 681252.66 E 0.000 0.00 5998616.49 N 681252.38 E 1,000 -O.71 5998614.01 N 681251.55 E :1.000 -2.85 5998609.88 N 681250.15 E 1.000 -6.41 5998603.89 N 681247.67 E 1.500 -11.44 5998595.86 N 681243.57 E 1.500 -17.96 5998595.32 N 681243.28 E 1.500 -18.39 5998589.81 N 681240.27 E 0.000 -22-81 5998586.84 N 681:238.60 E 1.500 -25.18 5998579.81 N 681234.00 E 1.500 -30.59 5998575.73 N 681230.32 E 1.500 -33.45 5998575.35 N 681229.89 E 1.000 -33.69 5998572.59 N 681226.76 E 1.000 -35.44 5998570.99 N 681224.95 E 1.000 -36.45 5998570.54 N 681224.43 E 1,000 -36.74 5998570,54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998570.54 N 681224.43 E 0.000 -36.74 5998571.56 N 681224.68 E 1.250 -35.83 5998574.70 N 681225.44 E 1.250 -33.04 5998579.95 N 681226.71 E 1.250 -28.37 5998587.32 N 681228.50 E 1.250 -21.82 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment KOP- Start Dir @ 1.000°/100ft: 600.00ft MD, 600.00ft TVD Dir Rate Increase @ 1.500°/100ft' 900.00fl MD, 899.86ft TVD End Dir, Sail @ 6.000° ' 1105.98ft MD, 1105.18ft TVD Start Dir @ 1.500°/100ft' 1165.98ft MD, 1164.86ft TVD Dir Rate Decrease @ 1.000°/10Oft ' 1388,76ft MD, 1386.94ft 'I~/D End Dir, Sail @ 0.000° · 1688.76ft MD, 1686.80ft TVD Base Permafrost Start Dir @ 1.250°/100ft' 1901.96ff MD, 1900.00ft TVD Continued... ~.q ,l~dv. 1998- 13:34 - I- DrillQuest Shared Services Drilling Point Mcintrye Measured Depth (ft) Incl, Azim, Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 2400.00 6.226 15.000 2348.46 2397.06 2500.00 7.476 15.000 2447.75 2496.35 2600.00 8.726 15.000 254.6.75 2595.35 2700.00 9.976 15.000 2645.42 2694.02 2701.96 10.000 15.000 2647.34 2695.94 2800,00 11.464 14.273 2743.67 2792.27 2900.00 12,959 13,698 2841.40 2890,00 3000.00 14.456 13.241 2938.55 2987.15 3100.00 15.952 12.868 3035.05 3083.65 3200.00 17.450 12.557 3130.83 3179.43 3300.00 18,948 12.295 3225.82 3274.42 3400.00 20.446 12.069 3319.97 3368.57 3433.60 20,949 12,000 3351.40 3400.00 3500.00 20.285 12.000 3413.55 3462.15 3540.30 19.882 12.000 3451.40 3500.00 3600.00 21.220 11.681 3507.30 3555.90 3700.00 23.464 11.224 3599.78 3648.38 3777.06 25.193 10.925 3670.00 3718.60 3800.00 25.708 10.843 3690.71 3739.31 3900.00 27.953 10.519 3T/9.94 3828.54 4000.00 30.199 10.240 3867.33 3915.93 4098.40 32.410 10.000 3951.40 4000.00 4100.00 32.410 10.000 3952.75 4001.35 4155.96 32.410 10.000 4000.00 4048.60 4200.00 32.410 10.000 4037.18 4085.78 4300.00 32.410 10.000 4121.60 4170.20 4400.00 32.410 10.000 4206.02 4254.62 4500.00 32.410 10.000 4290.45 4,339.05 4600.00 32.410 10.000 4374.87 4423.47 4700.00 32.410 10.000 4459.30 4,507.90 Proposal Report for P2-04 (F) Wp2 19.97 S 22.36 w 8.45 S 19.27 W 5.16 N 15.62 W 20.85 N 11.42 W 21.18 N 11.33 W 38.85 N 6,73 W 59.37 N 1.62 W 82.42 N 3.89 E 107.97 N 9.81 E 136,00 N 16.13 E 166.50 N 22.85 E 199.44 N 29.96 E 211.06 N 32.44 E 233.93 N 37.30 E 247.46 N 40.18 E 267.97 N 44.47 E 305.23 N 52.01 E 336.38 N 58.11 E 346.06 N 59.97 E 390.42 N 68.33 E 438.22 N 77.08 E 488.54 N 86.06 E 489.39 N 86.21 E 518,93 N 91.42 E 542.17 N 95.52 E 594.95 N 104.82 E 647.74 N 114.13 E 700.52 N 123.44 E 753.30 N 132.75 E 806.09 N 142.05 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (f~) (°/~00ft) (ft) 5998596.81 N 681230.79 E 1,250 -13.39 5998608.40 N 681233.60 E 1,250 -3.08 5998622.10 N 681236.91 E 1.250 9.09 5998637.89 N 681240.74 E 1.250 23.12 5998638.22 N 681240.82 E 1.250 23.41 5998655.99 N 681244.99 E 1.500 39.25 5998676.64 N 681249.60 E 1.500 57.71 5998699.81 N 681254.55 E 1.500 78.49 5998725.49 N 681259.85 E 1.500 101.58 5998753.67 N 681265.49 E 1.500 126.96 5998784.32 N 681271.47 E 1.500 154.62 5998817.43 N 681277.77 E 1.500 184.53 5998829.10 N 681279.97 E 1.500 195.09 5998852.08 N 681284.27 E 1.000 215.87 5998865.68 N 681286.82 E 1.000 228.17 5998886.29 N 681290.62 E 2.250 246.83 5998923.72 N 681297.25 E 2.250 280.79 5998955.01 N 681302.59 E 2.250 309.24 5998964.74 N 681304.22 E 2.250 318.09 5999009.28 N 681311.50 E 2.250 358.68 5999057.28 N 681319.09 E 2,250 402.50 5999107.81 N 681326.85 E 2.250 448.69 5999108.66 N 681326.97 E 0.000 449.46 5999138.31 N 681331.46 E 0,000 476.59 5999161.65 N 681335.00 E 0.000 497.94 5999214.64 N 681343.02 E 0.0(30 546.41 5999267.64 N 681351.05 E 0.000 594.89 5999320.63 N 681359.07 E 0.000 643.36 5999373.62 N 681367.09 E 0.000 691.84 5999426.61 N 681375.12 E 0.000 740.31 Alaska State Plane Zone 4 Point Mcintyre Pad 2 Comment Dir Rate Increase @ 1.500°/100ft' 2701.96fi MD, 2695.94ft TVD Formation Tendency @ 1.000°/100ft' 3433,60ft MD, 3400.00ft TVD Dir Rate increase @ 2.250°/100ff: 3540.30ft MD, 3500.00ft TVD SV4 [Estimate] End Dir, Sail @ 32.410° ' 4098.40ff MD, 4000.00ft TVD Top Stuck Pipe Zone Continued... X 2q ,hdv. ¢99R - 13:34 - 2 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sperry-Sun Drilling Services Sub.Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 4800.00 32.410 10.000 4543.72 4592.32 4900.00 32.410 10.000 4628.14 4676.74 4921.15 32.410 10.000 4646.00 4694.60 5000.00 32.410 10.000 4712-57 4761.17 5100.00 32.410 10.000 4796.99 4845.59 5103.57 32.410 10.000 4800.00 4848.60 5200.00 32.410 10.000 4881.41 4930.01 5222.02 32.410 10.000 4900.00 4948.60 5282.90 32.410 10.000 4951.40 5000.00 5300.00 32.921 9.911 4965.80 5014.40 5400.00 35.908 9.435 5048.28 5096.88 5440.71 37.125 9.260 5081.00 5129.60 5500.00 38,898 9.022. 5127.71 5176.31 5600.00 41.889 8.660 5203.87 5252.47 5700.00 44.881 8.338 5276.53 5325.13 5800.00 47.873 8.048 5345.52 5394.12 5817.60 48.400 8.000 5357.26 5405,86 5900.00 48.372 7.897 5411.98 5460.58 6000.00 48.337 7.771 5478.44 5527.04 6100.00 48.303 7.645 5544.93 5593.53 6200.00 48.269 7.519 5611.48 5660.08 6300.00 48.235 7.393 5678.06 5726.66 6400.00 48.201 7.287 5744.69 5793.29 6500.00 48.167 7.141 5811.36 5859.96 6600.00 48.134 7.014 5878.08 5926.68 6700.00 48.101 6. 887 5944.84 5993.44 6800.00 48.067 6.761 6011.65 6060,25 6900.00 48.034 6.634 6078.49 6127.09 7000.00 48.001 6.507 61 45.38 6193.98 7100.00 47.968 6.380 6212.32 6260.92 Proposal Report for P2-04 (F) Wp2 858.87 N 151.36 E 911.65 N 160.67 E 922.82 N 162.64 E 964.43 N 169.97 E 1017.22 N 179.28 E 1019.10 N 179.61 E 1070.00 N 188.59 E I081.62 N 190.64 E 1113.76 N 196.30 E 1122.85 N 197.90 E 1178.56 N 207.38 E 1202.46 N 211.32 E 1238.51 N 217.12 E 1302.53 N 227.07 E 1370.46 N 237.22 E 1442.10 N 247.53 E 1455.08 N 249.36 E 1516.10 N 257.88 E 1590.13 N 268.06 E 1664,14 N 278.08 E 1738.13 N 287.93 E 1812.11 N 297,61 E 1886.07 N 307.12 E 1960.01 N 316.47 E 2033.93 N 325.65 E 2107.84 N 334.66 E 2181.72 N 343.50 E 2255.59 N 352.17 E 2329.43 N 360.68 E 2403.26 N 369.01 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) {°/100ft) (ft) 5999479.61 N 681383.14 E 0.000 788.78 5999532.60 N 681391.17 E 0.000 837.26 5999543.81 N 681392.86 E 0.000 847.51 5999585.59 N 681399.19 E 0.000 885.73 5999638.59 N 691407.21 E 0.000 934.21 5999640.48 N 681407.50 E 0.000 935.94 5999691.58 N 681415.24 E 0.000 982.68 5999703.25 N 681417.00 E 0.000 993.35 5999735.51 N 681421.89 E 0.000 1022.87 5999744.64 N 681423.26 E 3.000 1031.22 5999800.56 N 681431.40 E 3.000 1082.47 5999824.55 N 681434.75 E 3.000 1104.49 5999860.73 N 681439,67 E 3.000 1137.75 5999924.98 N 681448,07 E 3.000 1196.90 5999993.13 N 681456~56 E 3.000 1259.76 6000065.00 N 681465.13 E 3,000 1326.17 6000078.02 N 681466.65 E 3,000 1338.21 6000139.23 N 681473.68 E 0,100 1394.83 6000213.48 N 681482,07 E 0.100 1463,57 6000287.71 N 681490.29 E 0.100 1532.34 6000361.93 N 681498.34 E 0.100 1601.14 6000436.12 N 681506.23 E 0.100 1669.96 6000510.28 N 681513.94 E 0.100 1738.81 6000584.43 N 681521.49 E 0.100 1807.69 6000658.55 N 681528.87 E 0.100 1876.59 6000732.65 N 681536.09 E 0.100 1945.52 6000806.73 N 681543.14 E 0.100 2014.48 6000880.79 N 681550.02 E 0.100 2083.46 6000954.82 N 681556.73 E 0.100 2152.47 6001028.83 N 681563.27 E 0.100 2221.50 Alaska State Plane Zone 4 Point Mcintyre Pad 2 Comment T-3 ('I'T6 / SV1) Bottom Stucl( Pipe Zone 9 5/8' Casing Start Dlr @ 3.000°/l~)0ft: 5282.90ft MD, 5000.00ft TVD UG4A (K-15) BHA Tendency @ 0.100°/100ft' 5817.60ft MD, 5405.86ft TVD Continued... X ~ .h~lv, lqqR - 13:3zf - 3 - Dr/llQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl, Azim. Sperry-Sun Drilling Services Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 7200.00 47.936 6.252 6279.29 6327.89 7300.00 47.903 6.125 6346.31 6394.91 7400.00 47.871 5,998 6413.37 6461.97 7500.00 47.838 5.870 6480.47 6529.07 7600.00 47.806 5,742 6547.61 6596.21 7700.00 47.774 5,614 6614.80 6663.40 7800.00 47.742 5,486 6682.02 6730.62 7900.00 47,711 5,358 6749.29 6797.89 8000.00 47.679 5,230 6816.60 6865.20 8100,00 47.648 5,101 6883.95 6932.55 8132.73 47,637 5.059 6906.00 6954,60 8200.00 47.616 4.973 6951.34 6999.94 8300,00 47,585 4,844 7018.77 7067.37 8400.00 47,554 4.715 7086.24 7134.84 8494.46 47,525 4.593 7150.00 7198.60 8500,00 47,524 4.588 7153.74 7202.34 8600.00 47.493 4,457 7221.29 7269.89 8700.00 47.462 4.328 7288.88 7337.48 8800.00 47.432 4.199 7356.51 7405.11 8900.00 47.402 4.069 7424.17 7472.77 9000.00 47.371 3.940 7491.88 7540,48 9100.00 47,341 3.810 7559.62 7608.22 9200.00 47.312 3.680 7627.40 7676.00 9300,00 47.282 3.550 7695.22_ 7743.82 9400.00 47.252 3.420 7763.08 7811.68 9500.00 47.223 3.290 7830.98 7879.58 9600.00 47.194 3.160 7898.91 7947.51 9700.00 47.165 3.029 7966.88 8015.48 9800.00 47.136 2.899 8034.89 8083.49 9900.00 47.107 2.768 8102.93 8151.53 Proposal Report for P2-04 (F) Wp2 2477.07 N 377.18 E 2550.86 N 385.19 E 2624.63 N 393.02 E 2698.37 N 400.68 E 2772.10 N 408.18 E 2845.80 N 415.51 E 2919.49 N 422.67 E 2993.15 N 429.66 E 3066.79 N 436.48 E 3140.41 N 443,14 E 3164,50 N 445.28 E 3214.01 N 449.63 E 3287.59 N 455.94 E 3361.14 N 462.09 E 3430.60 N 467.75 E 3434.67 N 468.08 E 3508.18 N 473,89 E 3581.66 N 479.53 E 3655.13 N 485.01 E 3728.56 N 490.32 E 3801,98 N 495.46 E 3875.37 N 500,43 E 3948.73 N 505.23 E 4022.07 N 509.86 E 4095.39 N 514.33 E 4168.68 N 518.63 E 4241.95 N 522.75 E 4315.19 N 526,71 E 4388.41 N 530.50 E 4461.60 N 534.13 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (ft) (°/~00ft) (ft) 6001102.81 N 681569.65 E 0.100 2290.56 6001176.77 N 681575.86 E 0.100 2359.64 6001250.71 N 681581.90 E 0.100 2428.75 6001324.62 N 681587.77 E 0.100 2497.88 6001398.50 N 681593.48 E 0.100 2567.03 6001472.37 N 681599.02 E 0,100 2636.~2 6001546.20 N 681604.39 E 0,100 2705,42 6001620.01 N 681609.59 E 0,100 2774.65 6001693.80 N 681614.63 E 0.100 2843.90 6001767.56 N 681619.49 E 0.100 2913.17 6001791.69 N 681621.05 E 0.100 2935.65 6001841.29 N 681624.19 E 0.100 2982.47 6001915.00 N 681628.73 E 0.100 3051.79 6001988.68 N 681633.09 E 0.100 3121.14 6002058.25 N 681637.06 E 0.100 3186.66 6002062.33 N 681637.29 E 0.100 3190.50 6002135.96 N 681641.31 E 0.100 3259.89 6002209.56 N 681645.17 E 0.100 3329,30 6002283.13 N 681648.87 E 0.100 3398.73 6002356,68 N 681652.39 E 0,100 3468.19 6002430,20 N 681655.75 E 0,100 3537.66 6002503.69 N 681658,94 E 0.100 3607.16 6002577.15 N 681661.96 E 0.100 3676.68 6002650.58 N 681664.81 E 0,100 3746,22 6002723.98 N 681667.50 E 0.100 3815.78 6002797.36 N 681670.02 E 0.100 3885.35 6002870.70 N 681672.37 E 0.100 3954,95 6002944.02 N 681674.55 E 0.100 4024.57 6003017.30 N 681676.56 E 0.100 4094.21 6003090.56 N 681678.41 E 0.100 4163.87 Comment West Sak Top Colville [Estimate] Alaska State Plane Zone 4 Point Mclntyre Pad 2 Con~nued... July, 1998 - 13:34 - 4 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth Vertical Depth (ft) 10000.00 47.078 2.637 8171.02 8219.62 10100.00 47.050 2.506 8239.13 8287.73 -- 10200.00 47.022 2.375 8307.29 8355.89 10276.32 47.000 2.275 8359.33 8407.93 10300.00 47.353 0.398 8375.42 8424.02 10400.00 49.167 352.730 8442.05 8490.65 10500.00 51.459 345.521 8505.96 8554.56 10600.00 54.164 338.795 8566.44 8615.04 10700.00 57.218 332.540 8622.84 8671.44 10800.00 60,562 326.719 8674.53 8723.13 10900.00 64.142 321.281 8720.96 8769.56 11000.00 67.913 316.172 8761.60 8810,20 11100.00 71.833 311.333 8796.02 8844.62 11200.00 75,870 306,710 8823.84 8872,44 11239.76 77.500 304.920 8833.00 8881.60 11300.00 77.500 304.920 8846.04 8894.64 11400.00 77.500 304,920 8867.68 8916.28 11424,57 77.500 304.920 8873.00 8921.60 11500.00 80,313 301.307 8887.52 8936.12 11600.00 84.098 296.607 8901.08 8949.68 11644.44 85.794 294.541 8905.00 8953.60 11676.07 87.004 293.077 8906.99 8955.59 / 11700.00 87.004 293.077 8908.24 8956.84 11800.00 87.004 293.077 8913.46 8962.06 11900.00 87.004 293.077 8918.69 8967.29 Sperry-Sun Drilling Services Proposal Report for P2-04 (F) Wp2 Local Coordinates Northings Eastings (ft) (ft) 4534.76 N 537.58 E 4607.90 N 540.86 E 4681.01 N 543.98 E 4736.79 N 546.24 E 4754.15 N 546.65 E 4828.52 N 542.11 E 4903.99 N 527.53 E 4979.71 N 503.07 E 5054.87 N 468.99 E 5128.64 N 425.68 E 520021 N 373.59 E 5268.81 N 313.31 E 5,333.66 N 245.49 E 5394.08 N 170.88 E 5416.72 N 139.50 E 5450.38 N 91.28 E 5506.27 N 11.23 E 5520.00 N 8.44 W 5560.42 N 70.43 W 5608.35 N 157.09 W 5627.46 N 197.02 W 5640.20 N 225.89 W 5649.56 N 247.88 W 5688.71 N 339.75 W 5727.85 N 431.62 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (fi) (°/100fi) (fi) 6003163.79 N 681680.08 E 0.100 4233.55 6003236_98 N 681681.59 E 0.100 4303.24 6003310.15 N 681682.94 E 0.100 4372.96 6003365.96 N 681683.85 E 0.100 4426.18 6003383.33 N 681683.83 E 6.000 444?_.82 6003457.57 N 681677.49 E 6.000 4515.77 6003532.66 N 681661,09 E 6.000 4592.41 6003607.77 N 681634.79 E 6.000 4671.90 6003682.08 N 681598.90 E 6.000 4753.38 6003754.78 N 681553,81 E 6.000 4835.95 6003825.07 N 681500,00 E 6.000 4918.70 6003892-18 N 681438.07 E 6.000 5000.74 6003955.37 N 661368.70 E 6.000 5081.15 6004013.96 N 681292.65 E 6.000 5159.07 6004035.83 N 681260.73 E 6.000 5189.16 6004068.31 N 681211.71 E 0.000 5234.33 6004122.24 N 681 I30.32 E 0,000 5309.31 6004135.49 N 681110.33 E 0,000 5327.73 6004174.39 N 681047.38 E 6.000 5383.04 60042.20.21 N 680959,58 E 6,000 5452.08 6004238.34 N 680919,20 E 6.000 5481.02 6004250.38 N 680890.03 E 6.000 5500.91 6004259.21 N 680867.82 E 0.000 5515.73 6004296.11 N 680775.02 E 0.000 5577.67 6004333.01 N 680682.23 E 0.000 5639.60 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Commen[ Start Dir @ 6.000°/100ft' 10276.32ft MD, 8407.93ft TVD End Dir, Sail @ 77.500°' 11239.76ff MD, 8881.60ft TVD HRZ SKtart Dir @ 6.000°/100ft- 11424.57ft MD, 8921.60ft ']"VD aiubik Top Kupamk End Dir, Sail @ 87.004° - 11676.07ft MD, 8955,59ft 'I'VD Continued... ..... c DriilQuest Sperry-Sun Drilling Services Proposal Report for P2-04 (F) Wp2 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 12000.00 87.004 293.077 8923.92 8972.52 5766.99 N 523.49 W 12100.00 87.004 293.077 8929.14 8977.74 5806.14 N 615.37 W 12200.00 87.004 293.077 8934.37 8982.97 5845.28 N 707.24 W 12300.00 87.004 293.077 8939.60 8988.20 5884.42 N 799.11 W 12400.00 87.004 293.077 8944.82 8993.42 5923.56 N 890.98 W 12500.00 87.004 293.077 8950.05 8998.65 5962.71 N 982.86 W 12600.00 87.004 293.077 8955.28 9003.88 6001.85 N 1074.73 W 12700.00 87.004 293.077 8960.50 9009.10 6040.99 N 1166.60 W 12786.07 87.004 293.077 8965.00 9013.60 6074.68 N 1245.68 W 12800.00 86.168 293.077 8965.83 9014.43 6080.13 N 1258.47 W 12900.00 80.168 293.077 8977.72 9026.32 6119.03 N 1349.77 W 13000.00 74.168 293.077 8999.92 9048.52 6157.23 N 1439.43 W 13066.88 70.156 293.077 9020.40 9069.00 6182.18 N 1497.99 W 13100.00 68.168 293.077 9032.18 9080.78 6194.31 N 1526.46 W 13188.83 62.839 293.077 9069.00 9117.60 6225.99 N 1600.80 W 13200.00 62.168, 293.077 9074.16 9122.76 6229.87 N 1609.92 W 13300.00 56.168 293.077 9125.39 9173.99 6263.51 N 1688.88 W 13328.83 54.439 293.077 9141.80 9190.40 6272.80 N 1710.68 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 6004369.92 N 680589.43 E 0.000 5701.54 6004406.82 N 680496.64 E 0.000 5763.47 600~'!.~.3.72 N 680403.84 E 0.000 5825.41 6004480.63 N 680311.05 E 0.000 5887.35 6004517.53 N 680218.25 E 0.000 5949.28 6004554.43 N 680125.46 E 0.000 6011.22 6004591.33 N 680032.67 E 0.000 6073.15 6004628.24 N 679939.87 E 0.000 6135.09 6004660.00 N 679860.00 E 0.000 6188.40 6004665.14 N 679847.08 E 6.000 6197.02 6004701.81 N 679754,86 E 6.000 6258.57 6004737.83 N 679664.30 E 6.000 6319.02 6004761.35 N 679605.16 E 6.000 6358.49 6004772.78 N 679576.39 E 6.000 6377.69 6004802.64 N 679501.31 E 6.000 6427.81 6004806.31 N 679492.10 E 6.000 6433.95 6004838.02 N 679412.35 E 6.000 6487.18 6004846.78 N 679390.32 E 6.000 6501.88 ~,11 data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. I-he Dogleg Severity is in Degrees per 100ff. /ertical Section is from Well Reference and calculated along an Azimuth of 344.746° (True). 3ased upon Minimum Curvature type calculations, at a Measured Depth of 13328.83ft., 'he Bottom Hole Displacement is 6501.88fl., in the Direction of 344.746° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Start Dir'@ 0.000"/1000 :/~2786.07ft MD, 9013.60ft 'rVD T~.~adius.. Geolog, cal WOC Total Depth- 13328.83ft MD, 9190.40ft TVD 7' Liner X 0 July, 1998 - 13:34 . $. DrillQuest DATE --] I CHECK NO. ~ o7/~_~/,q oo~4o3~ VENDOR Al _ASKAST ! 4 OC DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 070998 CK070998C 100. O0 100. O0 HANDLING INST' s/h carol witheg x-4114 THF All'A~HFD ~HFI~K I~ IN PAYMENT FOIl I'r~M~ DF~RIREO ABOVE. · WELL PERMIT CHECKLIST FIELD & POOL ~__~,//<::::~<::~ COMPANY ,~r- .,,--, WELL NAM -' ROGRAM: exp [] dev/~ redrll [] serv [] wellbore seg II ann. disposal para req II INIT CLASS ,(~zJ /'.-, ~,, / GEOL AREA ~---~ UNIT# //~....._~:.~'_~',,-ff ON/OFF SHORE O ~ ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number. ................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APPF& DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ,.~"o O~:~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............. 34. Contact name/phone for weekly progress reports ....... / Y N [exploratory only] GEOLOGY ANNULAR DISPOSAL 35. APPR DATE With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOL©GY: E N G [N_._E. _E_R_!~N_.,G: _u_ I_.~C[_A_.n_n_u. [~._r. C O M MIS S lO N: BE~_~'r~I~WMN~'S/:¢/'~ DWJ~ JDH~'- ' ' RNC. ~ ~ CO Cornmentsllnstructions: M:chet;,list rev 05/29/98 dlf:C:\msoffice\wordian\diana\checldist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Mon Mar 15 09:15:37 1999 Reel Header Service name ............. LISTPE Date ..................... 99/03/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/03/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER POINT McINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPER3~TOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: MWD RUN 2 AK-MM-80331 J. SACK K. WHITE MWD RUN 6 AK-MM-80331 T. PIEPER C. DIXON P2-04 500292290700 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 15-M_AR-99 MWD RUN 3 AK-MM-80331 B. HENNINGSE C. DIXON MWD RUN 7 AK-MM-80331 T. PIEPER C. DIXON 11 12N 14E MWD RUN 5 AK-MM-80331 T. PIEPER C. DIXON RECEWEE) 41 FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1018 .00 50.00 11.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 12.250 9.625 5239.0 3RD STRING 8.750 7.000 11436.0 PRODUCTION STRING 6.000 13000.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY ~ IS NOT PRESENTED. 3. MWD RUN 4 CONTAINS NO VALID DATA AND IS NOT PRESENTED. 4. MWD RUNS 2,5,6, AND 7 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISITVITY PHASE-4 (EWR-4) . 5. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON POROSITY (CNP) AND STABILIZED LITHO DENSITY (SLD) . 6. MWD RUN 3 IS COMMON TO BOTH P2-04 A_ND P2-04 PB1. NEUTRON POROSITY (CND) AND DENSITY (SLD) DATA FOR MWD RUN 3 IS PRESENTED IN SEDEP~ATE LOGS FOR WELL P2-04 PB1 AND WILL NOT BE PRESENTED HERE. 7. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM DEDE SCHWARTZ OF ARCO ALASKA, INC. ON 19 NOVEMBER, 1998. SPERRY-SUN MWD DATA IS PRIMARY DEPTH CONTROL (PDC) FOR WELL P2-04. 8. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13000'MD, 8903'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTP~A SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 5200.5 12958 0 FET 5239 0 12965 0 RPD 5239 0 12965 0 RPM 5239 0 12965 0 RPS 5239 0 12965 0 RPX 5239 0 12965 0 ROP 5250 0 13000 0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH .... BIT RUN NO MERGE TOP MERGE BASE 2 5250.0 10472.0 3 10472.0 10783.0 5 10783.0 11452.0 6 11452.0 11895.0 7 11895.0 13000.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 RPD MWD OHMM 4 1 68 8 3 ROP MWD FT/H 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 12 16 20 24 28 Name Min Max Mean Nsam DEPT 5200.5 13000 9100.25 15600 GR 6.4557 365.016 90.7834 15516 RPD 0.5595 2000 10.5449 15453 ROP 1.748 1926.56 182.378 15501 RPX 0.4624 2000 4.83189 15453 RPS 0.4143 2000 5.24539 15453 RPM 0.2804 2000 7.32298 15453 FET 0.0832 63.4556 1.40795 15453 First Reading 5200.5 5200.5 5239 5250 5239 5239 5239 5239 Last Reading 13000 12958 12965 13000 12965 12965 12965 12965 First Reading For Entire File .......... 5200.5 Last Reading For Entire File ........... 13000 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NLIMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE STA/{T DEPTH STOP DEPTH GR 5200.5 10436.5 FET 5239 0 RPD 5239 0 RPM 5239 0 RPS 5239 0 RPX 5239 0 ROP 5250 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA PJIY EWR4 $ 10429.0 10429.0 10429.0 10429.0 10429.0 10472.0 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record 17-AUG-98 5.07 5.46 MEMORY 10472.0 5250.0 10472.0 30.2 56.6 TOOL NUMBER P1063CRG6 P1063CRG6 8.750 8.8 LSND 9.60 48.0 10.3 1350 6.0 1.400 1.010 1.710 1.850 44.5 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Min 5200.5 8 4194 6 4557 0 4624 0 4143 0 4773 0 5595 0 0832 First Max Mean Nsam Reading 10472 7836.25 10544 5200.5 1926.56 243.641 10445 5250 156.561 85.924 10473 5200.5 26.375 2.69321 10381 5239 25.5149 2.73932 10381 5239 26.1256 2.76536 10381 5239 20.1426 2.79565 10381 5239 8.3107 0.510823 10381 5239 Last Reading 10472 10472 10436.5 10429 10429 10429 10429 10429 First Reading For Entire File .......... 5200.5 Last Reading For Entire File ........... 10472 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HED~DER FILE NLTMBER: 3 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 10425.0 RPD 10425 0 RPM 10425 0 RPS 10425 0 RPX 10425 0 GR 10435 0 ROP 10465 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P_AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPER3~TURE (MT): MUD AT MAX CIRCULATING TERMPEP~ATURE: STOP DEPTH 10783 0 10783 0 10783 0 10783 0 10783 0 10783 0 10783 0 19-AUG-98 5.07 5.46 MEMORY 10783.0 10472.0 10783.0 59.6 67.5 TOOL NUMBER P1072CRLGM6 P1072CRLGM6 8.750 8.8 LSND 10.50 42.0 9.5 17000 2.7 .746 .356 56.1 MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STAi~DOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .560 1.120 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR MWD 3 API 4 1 68 8 3 RPX MWD 3 OHMM 4 1 68 12 4 RPS MWD 3 OHMM 4 1 68 16 5 RPM MWD 3 OHMM 4 1 68 20 6 RPD MWD 3 OHMM 4 1 68 24 7 FET MWD 3 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Min 10425 16 1257 71 6346 1 8859 2 2945 2 2754 2 2995 1 3938 First Max Mean Nsam Reading 10783 10604 717 10425 1898.16 116.589 637 10465 136.979 111.174 697 10435 5.0487 2.65125 717 10425 4.9619 2.83275 717 10425 4.4307 2.90395 717 10425 3.9364 2.93863 717 10425 23.6851 5.35468 717 10425 Last Reading 10783 10783 10783 10783 10783 10783 10783 10783 First Reading For Entire File .......... 10425 Last Reading For Entire File ........... 10783 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE N-UMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10783.5 10783 5 10783 5 10783 5 10783 5 10783 5 10783 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 11414 11422 11452 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMNLA tLAY EWR4 ELECTROMAG. RESIS. 4 $ STOP DEPTH 11414 5 11414 5 11414 5 11414 5 5 0 5 26-AUG-98 5.07 5.46 MEMORY 11452.0 10783.0 11452.0 67.3 79.2 TOOL NUMBER P1067CRG6 P1067CRG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.750 8.8 LSND 10.50 49.0 9.5 10000 2.8 1.100 .553 .800 1.700 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 RPX MWD 5 OHMM 4 1 68 8 3 RPS MWD 5 OHMM 4 1 68 12 4 RPM MWD 5 OHMM 4 1 68 16 5 RPD MWD 5 OHMM 4 1 68 20 6 ROP MWD 5 FT/H 4 1 68 24 7 FET MWD 5 HOUR 4 1 68 28 8 68.9 First Name Min Max Mean Nsam Reading DEPT 10783.5 11452.5 11118 1339 10783.5 GR 63.866 365.016 155.512 1278 10783.5 Last Reading 11452.5 11422 RPX 1.5465 10.2264 4.20111 1263 RPS 2.1135 53.0907 5.99016 1263 RPM 2.3906 2000 25.3179 1263 RPD 1.3322 2000 36.1281 1263 ROP 1.748 659.766 37.1964 1339 FET 0.8819 12.8869 1.75589 1263 10783 5 10783 5 10783 5 10783 5 10783 5 10783 5 11414 5 11414 5 11414 5 11414 5 11452 5 11414 5 First Reading For Entire File .......... 10783.5 Last Reading For Entire File ........... 11452.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11415 0 11415 0 11415 0 11415 0 11415 0 11420 0 11450 0 STOP DEPTH 11859 5 11859 5 11859 5 11859 5 11859 5 11852 5 11894 5 30-AUG-98 SURFACE SOFTWARE VERSION: 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA R3kY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPER3tTURE (MT): MUD AT MAP( CIRCULATING TERMPEtLATURE: MUD FILTPJtTE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 5.46 MEMORY 11895.0 11452.0 11895.0 80.8 93.5 TOOL NUMBER P1047GR4 P1047GR4 6.000 6.0 LSND 10.00 44.0 9.5 16000 2.4 .260 .146 .700 .280 82.0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 GR MWD 6 API 4 RPX MWD 6 OHMM 4 RPS MWD 6 OHMM 4 RPM MWD 6 OHMM 4 RPD MWD 6 OHMM 4 ROP MWD 6 FT/H 4 FET MWD 6 HOI/R 4 1 ¢8 1 68 1 68 1 68 1 68 1 68 1 68 1 68 0 4 8 12 16 20 24 28 Name Min Max DEPT 11415 11894.5 11~ GR 44.1067 102.982 80 RPX 0.4702 2000 13 RPS 0.5361 2000 14 RPM 0.2804 2000 23 RPD 7.1049 2000 62 ROP 4.4312 438.418 27 FET 1.2944 63.4556 7 First Mean Nsam Reading 154.8 960 11415 8359 866 11420 5737 890 11415 3209 890 11415 0267 890 11415 4788 890 11415 6261 890 11450 6747 890 11415 Last Reading 11894 5 11852 5 11859 5 11859 5 11859 5 11859 5 11894 5 11859 5 First Reading For Entire File .......... 11415 Last Reading For Entire File ........... 11894.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEA/DER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11853 0 11860 0 11860 0 11860 0 11860 0 11860 0 11896 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12958 0 12965 0 12965 0 12965 0 12965 0 12965 0 13000 0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATLrRE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: 01-SEP-98 5.07 5.46 MEMORY 13000.0 11895.0 13000.0 84.7 91.8 TOOL NUMBER P1047GR4 P1047GR4 6.000 6.0 LSND 10.00 45.0 9.0 16000 2.4 .30O .182 .230 .450 74.4 .6 $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 RPX MWD 7 OHMM 4 1 68 8 3 RPS MWD 7 OHMM 4 1 68 12 4 RPM MWD 7 OHMM 4 1 68 16 5 RPD MWD 7 OHMM 4 1 68 20 6 ROP MWD 7 FT/H 4 1 68 24 7 FET MWD 7 HOUR 4 1 68 28 8 Name Min Max DEPT 11853 13000 GR 41.133 111.022 RPX 4.9829 23.3756 RPS 5.9471 171.626 RPM 5.335 26.6169 RPD 6.8387 23.9611 ROP 11.0648 611.682 FET 0.2806 20.7159 Mean Nsam 12426.5 2295 73 7724 2211 12 4106 2211 13 7047 2211 13 5356 2211 13 8452 2211 64 2507 2209 1.70905 2211 First Reading 11853 11853 11860 11860 11860 11860 11896 11860 Last Reading 13000 12958 12965 12965 12965 12965 13000 12965 First Reading For Entire File .......... 11853 Last Reading For Entire File ........... 13000 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/03/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/03/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Scientific Technical Technical Services Services Physical EOF Physical EOF End Of LIS File . , P204PBlO08221998SSN.t~_~ Sperry-Sun Drilling Services LIS Scan Utility Tue Mar 09 15'09:57 1999 Reel Header Service name ............. LISTPE Date ..................... 99/03/09 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. echnical Services Tape Header Service name ............. LISTPE Date ..................... 99/03/09 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. echnical Services Scientific T Scientific T Physical EOF Comment Record TAPE HEADER POINT MctNTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: S TAPE CREATION DATE: JOB DATA JOB NUMBER' MWD RUN 2 AK-MM-80331 RECEIVED 1 5 1999 P2-04 PB1 500292290770 ARCO ALASKA INC. SPERRY-SUN DRILLING SERVICE 09-MAR- 99 MWD RUN 3 MWD RUN 4 AK-MM-80331 AK-MH-80331 Page 1 P204PB1008221998SSN.T LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD J. SACK K. WHITE 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: WISE ED. R) RAY N AS ER, B. HENNINGSE C. DIXON M. GABEL C. DIXON 11 12N 14E 41 1018 50.00 .00 11.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 5239.0 8.750 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHER NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENT 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA PAY (DG AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4). 4. MWD RUNS 3 AND 4 A_RE DIRECTIONAL WITH DUAL (DGR), ELECTROMuXGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NUETRO POROSITY (CNP), A_ND STABILIZED LITHO DENSITY (SLD). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED PER THE E-MAIL MESSAGE FROM DEDE SCHWARTZ OF ARCO ALASICA, INC. ON 19 NOVEMB Page 2 P204PB1008221998SSN.I OR 1999. SPERRY-SUN MWD DATA IS PRIMARY DEPTH CONTROL (PDC) F WELL P2-04 PB1. 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13225'MD 9095'SSTVD. SROP = SMOOTHED PATE OF PENETRATION WHILE DRILLING. TRA DIUM EP TONE TES. ES. SGRC = SMOOTHED GAMlZLARAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EX SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (ME SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DE SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDS MATRIX-FIXED HOLE SIZE). SNNA = SMOOTHED AVERAGE OF NEAt~ DETECTORS' COUNT RA SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RAT SBD2 = SMOOTHED BULK DENSITY - COMPENSATED. SCO2 = SMOOTHED STANDOFF CORRECTION. SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR. ENVIRONMENTAL PAPJUMETERS USED IN PROCESSING NUCLEAR/NEUTRON LOG DATA: HOLE SIZE = MUD FILTRATE SALINITY = MUD WEIGHT = FORMATION WATER SALINITY = FLUID DENSITY = MATRIX DENSITY = LITHOLOGY = $ File Header Service name ............. STSLIB.001 8.75" 1200 PPM. 9.8 - 10.2 PPG. 14545 PPM. 1.o G/CC 2.65 G/CC SANDSTONE Page 3 P204PBlO08221998SSN.Y Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE S~Y PBU TOOL CODE STAi~T DEPTH STOP DEPTH PEF GR 5200.5 13159.0 FET 5239.0 13139.0 RPD 5239.0 13139.0 RPM 5239.0 13139.0 RPS 5239.0 13139.0 RPX 5239.0 13139.0 ROP 5250.0 13224.0 DRHO 10470.0 13147.5 RHOB 10470.0 13147.5 FCNT 10470.0 13113.0 NCNT 10470.0 13113.0 NPHI 10470.0 13113.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 5250.0 10472.0 3 10472.0 10924.0 4 10924.0 13225.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REM_ARKS: MERGED MAIN PASS. Page 4 P204PB1008221998SSN.Y $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name DEPT GR MWD RPX MWD RPS MWD RPM MWD RPD MWD Service Order NPHI MWD ROP MWD FET MWD FCNT MWD NCNT MWD RHOB MWD DRHO MWD PEF MWD Units Size Nsam Rep FT 4 1 68 API 4 1 68 OHM~ 4 1 68 OH~ 4 1 68 OHN/~ 4 1 68 OHMM 4 1 68 P .U. 4 1 68 FT/H 4 1 68 HOUR 4 1 68 CNTS 4 1 68 CNTS 4 1 68 G/CC 4 1 68 G/CC 4 1 68 BARN 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 st Name ng DEPT 24 GR 59 RPX 39 RPS 39 RPM 39 Min 5200.5 6.4557 0.1347 0.2176 0.3341 Max 13224 354.725 2000 2000 2000 Mean Nsam 9212.25 16048 87.3599 15918 6.32466 15801 6.90044 15801 7.52943 15801 First Reading 5200.5 5200.5 5239 5239 5239 La Readi 132 131 131 131 131 Page 5 P204PB1008221998SSN.~ RPD 0.3369 39 NPHI 17.1849 13 ROP 5.8681 24 FET 0.0832 39 FCNT 516.845 13 NCNT 2247.07 13 RHOB 2.1381 .5 DRHO -0.114 .5 PEF 1.77 69 .5 2000 8.22155 15801 72.0713 34.3266 5287 1926.56 196.726 15949 23.6851 1.378 15801 1111.54 669.496 5287 3656 2851.7 5287 3.5197 2.60591 5356 0.7505 0.105546 5356 12.6419 6.40531 5356 5239 10470 5250 5239 10470 10470 10470 10470 10470 131 131 132 131 131 131 13147 13147 13147 First Reading For Entire File .......... 5200.5 Last Reading For Entire File ........... 13224 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Page 6 P204PB1008221998SSN.7 Comment Record FILE HEADER FILE NUMBER: 2 PAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE STAi%T DEPTH STOP DEPTH GR 5200.5 10436.5 FET 5239.0 10429.0 RPD 5239.0 10429.0 RPM 5239.0 10429.0 RPS 5239.0 10429.0 RPX 5239.0 10429.0 ROP 5250.0 10472 . 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAX IMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 17-AUG-98 5.07 5.46 MEMORY 10472.0 5250.0 10472.0 30.2 56.6 TOOL NUMBER P1063CRG6 P1063CRG6 8.750 8.8 LSND Page 7 P204PBlO08221998SSN.T MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHFIM) AT TEMPEPJkTURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT Mh~O( CIRCULATING TERMPERATURE: MUD FILTPJ~TE AT MT: MUD CAI<E AT MT: (IN) : NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMu%RKS: $ Data Format Specification Record Data Record Type .................. Data Specification Block Type ..... Logging Direction ................. Optical log depth units ........... Data Reference Point .............. Frame Spacing ..................... 0 0 Down Feet Undefined 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 9.60 48.0 10.3 1350 6.0 1.400 1.010 1.710 1.850 Name DEPT GR RPX RPS RPM RPD ROP FET Service Order Units Size Nsam FT 4 1 68 MWD 2 API 4 1 68 MWD 2 OH~ 4 1 68 MWD 2 OHMM 4 1 68 MWD 2 OH~ 4 1 68 MWD 2 OH~IM 4 1 68 MWD 2 FT/H 4 1 68 MWD 2 HOUR 4 1 68 Rep Code Offset 0 4 8 12 16 20 24 28 Channel 1 2 3 4 5 6 7 8 44.5 Page 8 P204PB1008221998SSN.7 st Name Min ng DEPT 5200.5 72 GR 6. 4557 .5 RPX 0.4624 29 RPS 0. 4143 29 RPM 0. 4773 29 RPD 0. 5595 29 ROP 8. 4194 72 FET 0. 0832 29 Max Mean Nsam 10472 7836.25 10544 156.561 85.924 10473 26.375 2.69321 10381 25.5149 2.73932 10381 26.1256 2.76536 10381 20.1426 2.79565 10381 1926.56 243.641 10445 8.3107 0.510823 10381 First Reading 5200.5 5200.5 5239 5239 5239 5239 5250 5239 La Readi 104 10436 104 104 104 104 104 104 First Reading For Entire File .......... 5200.5 Last Reading For Entire File ........... 10472 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Page 9 P204PBlO08221998SSN.T Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUHPLARY VENDOR TOOL CODE STAt~T FET 10425 RPD 10425 RPM 10425 RPS 10425 RPX 10425 GR 10435 ROP 10465 PEF 10470 DRHO 10470 RHOB 10470 FCNT 10470 NCNT 10470 NPHI 10470 $ LOG HEADER DATA DATE LOGGED: SOFTWA/~E DEPTH STOP DEPTH .0 10837.0 .0 10837.0 .0 10837.0 .0 10837.0 .0 10837.0 .0 10856.5 .0 10923.0 .0 10845.5 .0 10845.5 .0 10845.5 .0 10811.0 .0 10811.0 .0 10811.0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. separate files. 19-AUG-98 5.07 5.46 MEMORY 10924.0 10472.0 10924.0 59.6 67.5 TOOL NUMBER P1072CRLGM6 P1072CRLGM6 Page 10 P204PBlO08221998SSN.Y CNP SLD $ COMPENSATED NEUTRON STABILIZED LITHO DEN BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : (IN) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Directi Optical log dep Data Reference Frame Spacing.. Max frames per Absent value... Depth Units .... Datum Specifica on ................. Down th units ........... Feet Point .............. Undefined ................... 60 .liN record ............. Undefined ................... -999.25 e®®ee~eee®eeeeee®ee tion Block sub-type...0 P1072CRLGM6 P1072CRLGM6 8.750 8.8 LSND 10.50 42.0 9.5 17000 2.7 .746 .356 .560 1.120 56.1 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 Page 11 P204PBlO08221998SSN.T; GR MWD 3 RPX MWD 3 RPS MWD 3 RPM MWD 3 RPD MWD 3 NPHI MWD 3 FCNT MWD 3 NCNT MWD 3 RHOB MWD 3 DRHO MWD 3 PEF MWD 3 FET MWD 3 ROP MWD 3 API 4 1 68 OHMH 4 1 68 OHM~ 4 1 68 OHHM 4 1 68 OHN~M 4 1 68 P.U. 4 1 68 CNTS 4 1 68 CNTS 4 1 68 G/CC 4 1 68 G/CC 4 1 68 BARN 4 1 68 HOUR 4 1 68 FT/H 4 1 68 4 8 12 16 20 24 28 32 36 40 44 48 52 2 3 4 5 6 7 8 9 10 11 12 13 14 st Name Min Max Mean ng DEPT 10425 10923 10674 23 GR 71.6346 136.979 110.092 .5 RPX 1.8859 5.0487 2.68556 37 RPS 2.1977 4.9619 2.86564 37 RPM 2.2754 4.7091 2.9435 37 RPD 2.2995 4.461 2.97829 37 NPHI 18.8154 39.7064 30.6569 11 FCNT 643 990.266 765.516 11 NCNT 2533.47 3399.98 2889.48 11 RHOB 2.2539 2.7163 2.5314 .5 DRHO -0.078 0.5293 0.036419 .5 PEF 1 . 7769 10. 9911 4 . 0903 .5 FET 1.3938 23.6851 5.10855 37 Ns am 997 844 825 825 825 825 683 683 683 752 752 752 825 First Reading 10425 10435 10425 10425 10425 10425 10470 10470 10470 10470 10470 10470 10425 La Readi 109 10856 108 108 108 108 108 108 108 10845 10845 10845 108 Page 12 P204PBlO08221998SSN.T ROP 5.8681 1898.16 95.218 23 917 10465 109 First Reading For Entire File .......... 10425 Last Reading For Entire File ........... 10923 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FCNT 10812.5 NCNT 10812.5 NPHI 10812.5 FET 10838.5 RPD 10838.5 STOP DEPTH 13113.0 13113.0 13113.0 13139.0 13139.0 Page 13 P204PB1008221998SSN.T~ RPM 10838.5 RPS 10838.5 RPX 10838.5 PEF 10847.5 DRHO 10847.5 RHOB 10847.5 GR 10858.0 ROP 10925.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWA~RE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAM~3~PJ~Y EWR4 ELECTRONLAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AIND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 13139.0 13139.0 13139.0 13147.5 13147.5 13147.5 13159.0 13224.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMI~) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 22 -AUG- 98 5.07 5.46 MEMORY 13225.0 10924.0 13225.0 67.4 91.3 TOOL NUMBER P1072CRLGM6 P1072CRLGM6 P1072CRLGM6 P1072CRLGM6 8.750 8.8 LSND 10.60 47.0 8.8 16000 2.9 .746 .295 72.2 Page 14 P204PB1008221998SSN.Y MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : (IN) : REM_ARKS: Data Format Specification Record Data Record Type .................. Data Specification Block Type ..... Logging Direction ................. Optical log depth units ........... Data Reference Point .............. Frame Spacing ..................... Max frames per record ............. Absent value ...................... Depth Units ....................... Datum Specification Block 0 0 Down Feet Undefined 60 .liN Undefined -999.25 sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 GR MWD 4 API 4 1 RPX MWD 4 OHMM 4 1 RPS MWD 4 OHI~M 4 1 RPM MWD 4 OHI{M 4 1 RPD MWD 4 OHI{M 4 1 NPHI MWD 4 P.U. 4 1 ROP MWD 4 FT/H 4 1 FET MWD 4 HOUR 4 1 FCNT MWD 4 CNTS 4 1 NCNT MWD 4 CNTS 4 1 RHOB MWD 4 G/CC 4 t DRHO MWD 4 G/CC 4 1 PEF MWD 4 BARN 4 1 .560 1.120 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 68 32 9 68 36 10 68 40 11 68 44 12 68 48 13 68 52 14 st First La Page 15 P204PB1008221998SSN.T~ Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/03/09 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. echnical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/03/09 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. echnical Services Scientific T Scientific T Physical EOF Physical EOF End Of LIS File Page 17