Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-181
By Meredith Guhl at 1:29 pm, Sep 10, 2021 MGR08OCT2021 DSR-9/13/21 SFD 9/10/2021RBDMS HEW 9/10/2021 Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:198-181 6.50-029-20184-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12714 9524 8555 9481 9982 9524, 12650 8526 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32 - 112 32 - 112 1530 520 Surface 2799 13-3/8" 31 - 2830 31 - 2830 4930 2670 Intermediate 8318 9-5/8" 29 - 8347 29 - 7721 6870 4760 Liner 1508 7" 8174 - 9682 7572 - 8663 7240 5410 Perforation Depth: Measured depth: 10420 - 12640 feet True vertical depth:9041 - 9043 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 27 - 9537 27 -8564 9481 8526Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker SB3 Packer Liner 3179 4-1/2" 9535 -12714 8562 - 9045 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 850115015164 300 24854 Well Not Online 600 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Noel Nocas Noel.Nocas@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5278 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9045 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Pull Tubing Patch Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028299 PBU E-04A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Meredith Guhl at 3:37 pm, Aug 20, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.08.20 13:19:17 -08'00' Stan Golis (880) RBDMS HEW 8/25/2021 MGR20AUG2021 DSR-8/20/21 ACTIVITY DATE SUMMARY 7/26/2021 ***WELL S/I ON ARRIVAL*** (patch tubing/ liner) PULLED 36' x 4 1/2" FLOW GUARD PATCH FROM 7705' MD (MISSING 2 ELEMENTS). RAN 4 1/2" BRUSH, AND WIRE GRAB TO NIP REDUCER @ 9524' MD (NO RECOVERY). BAILED ~ 2 CUPS OF ELEMENT PIECES FROM 2 7/8" XX PLUG @ 9524' MD. RAN 2.5" HYD BAILER TO 9524' MD (1 SMALL RUBBER PIECE). RAN DOGLESS GS W/ EQ PRONG TO 9524' MD. NO PRESSURE CHANGE. GOOD RING ON PRONG, PIN MOSTLY SHEARED). ***WSR CONTINUED ON 7-27-21*** 7/27/2021 ***WSR CONTINUED FROM 7-26-21*** PULLED 2.31" XX PLUG FROM 9524' MD. PULLED NIPPLE REDUCER FROM 9524' MD. RAN 3.68" CENT, AND 1.75" SAMPLE BAILER. UNABLE TO PASS 9982' SLM. METAL MARKS ON BAILER BTM (SIDES SQUISHED INWARD). RAN 3.50" LIB TO 9984' SLM. PICTURE OF CIBP (MOVED UPHOLE). RAN 3.50" BARBELL, 1 1/2" POCKET POKER W/ BRASS TATTLE TELLS TO 9,984' SLM. JARRED DOWN 30 MINS CIBP CORE W/ NO MOVEMENT. RAN 40 ARM CALIPER FROM 9984' SLM. GOOD DATA. SET 3.81" XX PLUG @ 9524' MD. (secure for IA MOASP wait for coil scheduling) ***WELL LEFT S/I ON DEPARTURE*** Daily Report of Well Operations PBU E-04A • STATE OF ALASKA • RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS OCT 0 5 2017 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 A • u w ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved rogram 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well a Re-enter Susp Well 0 Other:Set Patch -f z E7 r r2,7 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 198-181 3. Address: P.O.Box 196612 Anchorage, Development I1 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20184-01-00 7. Property Designation(Lease Number): ADL 0028299 8. Well Name and Number PBU E-04A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12714 feet Plugs measured 10535/12650 feet true vertical 9045 feet Junk measured 12632/12633 feet Effective Depth: measured 10535 feet Packer measured 9478 feet true vertical 9040 feet Packer true vertical 8524 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 32-112 32-112 1530 520 Surface 2799 13-3/8"72#N-80 31-2830 31-2830 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10420-10470 feet 10600-10800 feet 11070-11120 feet 11120-11170 feet 11670-11730 feet 12402-12640 feet True vertical depth: 9041-9041 feet feet 9039-9039 feet 9045-9046 feet 9046-9045 feet 9040-9044 feet 9037-9043 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-9535 27-8562 Packers and SSSV(type,measured and 4-1/2"Baker SB3 Packer 9478 8524 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED NOV 0 8 2017. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 681 47128 129 1580 1057 Subsequent to operation: Shut-In 220 725 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory ❑ Development p Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Derrick,Laurie R Contact Name: Derrick,Laurie R Authorized Title: P troleum Engineer /61/51/2.7. Contact Email: Laurie.Derrick@bp.com Authorized Signature: AAA- Date: Contact Phone: +1 907 564 5952 Form 10-404 Revised 04/2017 l''7-1-- / 0 { 6 I 17-' A(0j*��i RBDMS L-` UI,1 - 6 20l/Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary October 5, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Repairing of Tubing by Setting of a Patch for Well E-04A, PTD # 198-181. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • m 0.00000000 � Nf- COCO - 000 • O N V ti r- M Vy is MM P V- (+) M O 1.0 CA co CO N `r nr O mY- Ti' COCOh- ODODCI O N- O N O N N MONCOtcOOO - co N- CO O O r- NNN- OOCAOOf,- 0 O O CV "tf' N N O O ti CO N. O M M M O O N N N- co f- CO ti O O N r- w � MOcOo � Cr) M 00 M CO O r- N N CO CDc‘i CA 0 C, 2 • Qx- O N O 10 NC( M co M N- ((j N 0 • 0 N co 0) N = c.) • Ca co H a a 0 0 0 O o p O Oo Oo m C! `rzzZc• 4t 4t as = N4 4 - Coto N N � � � N � eNLL U O M - - N CU N () to !� r r O a) 4 4 m C O N. 0 N O O M J N N CO — M 0) W W Q Q N O W W w V rn u_ W ce cew Z U Z c W W W W m . ODI" F- ZZDQ C� fnZZJ = I- d II, 111/0 0 0 "30 ulN II 25d N .Qd N C j 1+ X p = m aJ a) 0-73 o t1 U a) N L. pall- 1430) U c6 0asc ° 0 s +� 0 2 N 2 0 _ N C 2 Co . H 15 2 a) it r ,io)d' N ? N 0 «S 2) C N 143 17 CV 7 Oi�1 J •i •J o4- V ( w v p _ N W N o H Y0O * Z � * Z vi •�' . cD W ° N E Z .° O >- �Om vI) X � rnccoam ELo - W2a W Lo o 0 J4 E = w ? v WLo 000 rnCL - aw N E Loo i < 6- 00 00 � wCD CD N. NN c8v la J0 t w �Ce o•o nc.i 8 d L>> a - 22cp � °) vr Nva i) a) - ct. WLR '55 a)mm O O 4) N - N tnN Q1v UCL Na. 0 0 asL. � � � a � �g -g� o ZIYoo < fn QZw�d Z LLIcNitiE DO o Q• °' vii < E2 W aD � � °i°iO -aXoUNO a 0.= ai *OaZ � DEQ n Ha 0 p ° �.. = y0 � CL0 U� UUJ UJ OWr DO - 0m � = W � a � 0w x .c F- x OD g as G m cbw0aaw � Nc < w ° e c QXU x mat- * 0 CO � 0 O. moire > � aaZ w xZ = 0 ELLaN J20 � OZ2 * w a c- xu. wi- 21= 71x - w c `I 0 up XXCLOW ' `n = U * 2 � u, �. ce * vZ _foXXONUa O IQ_M m °-NXu. IYO U) - ZD a...im �+ < %-' @00 a02m00D200 Eu- O Q- OaoCLJ ~ ao .j- - z EW O > CLtn OzOvS� Q@� °' °� � waf- � ZcnCL �° oQ C � � CL _JJU_ UWOOCCD ~ w °i aim oONSiZ � � aa Co ' ' (D � c9LL000� 1YCLwDOCLas U = v CLJ0 - Y ODOw rn 0 = Z8NY � JJOpaa � C� 't N m � CLDw � W F- aw0 p -- m Ov- MWma- m2wCLxa0 ' = ,.- - cN pWCLW NU O WO v0 F6 Q, - coQN XXo_ UJ� a UP o 0zwd x ( pO � � - ©n NCL — - ren a) J � ClI— DOZHN � F- Ya-' . P _ _ c� � Q � CL g ,nJ «. -j w J J m 0 V N Q m II C — Z Q Z v 2 0 N d W p iI W > 3: LL F_ F_ 2OCDl � w ¢ °' ococ ww : UO ~ a� * 0CLCLcoa. CL * * (/) U) 0 * I- o a /) (7 * W _J0 CL w ) -I * * i- CICO UJ F- Q N- N. r` I- ti 0 >- 0 0 0 0 0 H CV CV CV CV n co co CV CV CV N- N- CV Vco co U) Coco Q • . N ca. o w a n o a II a) rd vi Q .. c U3 m X ... m T- 25 "c5i m o m °' ar �- -Q N N F- p N O U c > 0 m ti Q •N •cN O F- � �' � r'' sea-Y -= o E c II - <(0 C 0 J cn Ja 'tn a) o O U > a Q C O Z Q `. >Zc � LQ '� y N E •c Q m = Ooa = N 1— p — a = ccod) a O Z ON. N > _ W N c .r , N " c O SD Eo 0 -0 • V 11 m m 2 c I- Q 15 U cO � LIJ � �. O Q M a) Q UQ a) o � 1— '-' 17c.,,00 X (0 • N C W 0. 60 .- , O .. o o w UQ z aco sz— m ccv 0 m2 �� w° Q Q a LU ' ' 0 " w o m C CO J Qt- U .c o o = aZ g o a o_ m` Wim _ O O 0 w = w N 0 c N • v� O-t w J ° GO 'N F- O to c0 0 c E 3 ‹ — � �o N a' d Z w /I/ W Q N ©a O- 0 CL v) O) I— CU L. � aamH Nrn cU 112 Z0 CT W m0 2 I-}i gW .04- No O. o � 2 °' "- r° Y c Cl) � � o F- w a co rn co OQ --- -(7) oU8 - coo. •Y Z 66 *x m F-w 0 cn � oar 0 oNaf)) o E •2 Jp * Q - Q z QoNas � • 0 O Qma Q o En wZ * m p W a .t = ,c0 W � F- � � � `oo = m5 ". N 13 tE) w D N Q u) � ooEO 1,1 c • C m co owccoolm- ( � o-i LI)0 N0 � @Ena ci �- _' •= -cQ L. O. _1-o Or. c CL T_ . m : LL. OQm F - a = Mui i co�1 - 0 m NN 3coa o t!) aJ } = oJ ZciU w 0 a w n Q1 7Q - MN II O > m = QM0 W II cn 0 _ ( m c OinQ NI- O !Z— f' ar- U � � Q z Qi It H 7 - N. Q II V o .� a) co 'tA '"' 7 c ch O � U-1E = c M >' aEi0 0 oN +z 3z0 � O � W � � � Z Z ("1---L0 — > • .� - 0 1- N Cn f ° E � o •cN m cod ° OQawwQ 2 - a 15 w u' CL.01- nM \ � a= Q to E L Z w F- _ ANO Cti aMcO = oo ° - UUZZ = _ Poi < ^u) W oNL0U ^* -QT- o a) LO c F- O F- - - -C J - II '.O � m * I. aa 3 0Loo = -� QF- F- � ~ NJ of a co x rn v� E u rn °r° mQT- NQ ai � � cc=/) 0I- 00 = �=j � cc L- ;> � 2toa) ° cn CD -0 � m •QF- � NLo a� JI�I = O0 � 0E- 0p L- � 0 a ._ o E 0 < > II Cc: O Ffl.c .c 30 a 11 ,c W > 0 CO CO 0 a _ . U .9-0 m 11 Q o w) O O Em E � E c = O � EJ0000z F- cnO m2a0 0o ' - -0 F-- a �va o � v) LL CI) < 0 « X2cwn � � .= rec4 * NI ca) v) N- ti O O O O NN— p N N N. N- co co N N co co co co a • 0 —J _J C0 ti N J * * _ N. w O C' c0 0 P. c = Q W O D z d N f c\i0 = o co a o z' O M LO S as E i m co o ° co s) 2 m 0. Z �' � � °� z0 O so aro " � p u) J p 0 X O co in N O d �� 2co m OH 0 ( 0) _= 0 O = aoM - Y 2 .K_, n � N LL 31: W U _ c Tr Z Q it V) f -J 0,. O o � > N Ln Ln , co2 2W m S cn � M � JFLu) ,, g c▪ a * O 0) LL O * O ©@ � XO O) H LI O > z ~ � aaN � 0o re Zcn � W z rn A ( QODz 0j1- 02 Z 0 > NaOO z � > > zZecuD 0 „ Jace O a 0 ; TREE= 4-1/16"CM WELLFEAD= MCEVOY E_ '04A SAFETY NOTES:WELL ANGLE>70"@ 10288'. ACTUATOR= BAKER NITIAL KB.ELE 56.52' BF.ELEV= 28.6' KOP= 3480' Max Angle= 94 Q 11563' I 2203' I—I4-1/2"HES X NP,ID=3.813" Datum MD= 9989' D3tumTVD= 8800'SS 13-3/8"CSG,72#,N-80,D=12.347" I--{ 2840' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3037 3036' 3 MMG DMY IE 0 02/20/17 a 5 4076 4041'26 MAG DMY RK 0 02/16/17 Minimum ID =2.45" 7705' 4 5843 5552'34 MMG DMY FE 0 01/17/99 4-1/2" FLO-GUARD PATCH 3 6733 6303 31 MMG DMY RK 0 02/16/17 2 8027 7441'27 MMG DMY RK 0 08/25/17 1 9400 8471'47 KGB DMY NT 0 01/17/99 4-1/2"BKR FLO-GUARD PATCH, -H 7705'-7737' X C D=2.45'(08/31/17) M&LOUT WINDOW(E 04A)@ 8347'-8365' 8 9470' H4-1/2"I-ES X NP,D=3.813" TOP OF 7"LNER --I 8174' --I 9481' ___17"X 4-1/2"BKR S-3 PKR,D=3.875" ---I 9604' —14-1/2"PX PLUG(06/12/17) --I 9624' --I4-1/2"HES X NP,D=3.813" 9624' —14-1/2"X 2-7/8"NP RED(08/27/17) —1 9636' —{TOP OF 4-1/2"LNR 9-5/8"WHIPSTOCK —I 8347. ;;�% 963T —14-1/2"WLEG,D=3.958" 9629' H ELM)TT LOGGED 01/26/99 -o. 632' —FISI-t WALLED CSP —I 8378' '1111114 CEPS TOP OF 7"LNR —I 8611' 11111111 ♦ (07/12/14) 411111111 ,a �1�.1.111.11 ilk 1 ' CSP 9-5/8"CSG,47#,N-80,I)=8.681" — 9131' 1111111 .11111111111111 �( PERFORATION SUMMARY111111111111111 T LNR,26#,L-80, 9682 tl• REF LOG:M)M)GR ON 01/04/99 111111111111111 .0383 b f,D=6276' //t i• 11111111 pAt t..;� ANGLE AT TOP PEW:86°Q 10420' 111111111111111 4112"CUP(07/12/14) 10636 Note:Refer to Production DB for historical pert data 111111111111111 SIZE ' SPF NTERVAL Opn/Sgz SHOT SOZ 111111111111111 '2-7/8"i 6 10420-10470 0 02/05/03 111111111111111 4-1/2"LNR,12.6#,L-80,.0152 bpf,D=3.958" —I 12714 2-7/8" ! 4 10600-10800 C 03/07/01 111111111111111 '2-7/8" 6 11070-11170 C 02/05/03 111111111111111 111111111111111 2-7/8" 4 11670-11730 C 10/09/99 111111111111111 2-7/8" 4 12402-12640 C 01/30/99 111111111111111 111111111111111 111111111111111 •TEN LOG-1223/98-01/05/99 SPERRY SUN MAO 111111111111111 11111111 PBTD H 10141' i11111•1i11111i 7"LNR,26#,L-80,0.0383 bpf,D=6.276" —{ 10195' +-1.1.1.1.1.1.1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/12176 ORIGINAL COMPLETION 08/28/17 JMUJMD GLV CJO(08/25/17) WAIL E-04A 01/18/99 JJ SIDETRACK(E-04A) 08/28/17 JGUJMD PULLED PLUGS/SET NP RED 8 PLUG PERMIT No:"981810 0422/01 RN'TP CORREC11ONS 09/11/17 NXW/JMD SET FLO-GU.RD PATCH(08/31/17) AA No: 50-029-20184-01 02/05/03 KSB(IP TEN LOG 09/11/17 BSEIJMD PULLED PLUG(09/05/17) SEC 6,T11 N,R14E,1154'FM_8 502'FEL 02/27/17 ZV/JMD SET PLUG(0220/17) 0622/17 BSE/JMD SET PX PLUG(06/12/17) BP Exploration(Alaska) • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday, September 4, 2017 9:49 AM To: AK, OPS EOC Specialists;AK, OPS GC1 Facility OTL;AK, OPS GC1 Field O&M IL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad DG;AK, OPS Well Pad EKG;AK, OPS Well Pad VP;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Alatalo, Travis;Cerveny, Philip F; Derrick, Laurie R; Frankenburg,Amy; Haffener,Jordan; Oshiro,Joleen; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel, Joshua;Worthington, Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer E-04 (PTD#1981810)Well barriers restored with tubing patch All, Producer E-04(PTD#1981810)was made not operable on 2/22/17 for having rapid TxIA communication and failing a cold TIFL. Slickline ran a caliper on 2/19/17 and found heavy wall penetrations at 7,717' which is suspected to be a hole. On 8/31/17 Eline set a tubing patch from 7707'-7737'and DHD performed a passing MIT-IA to 2,681psi on 9/1/17. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. Please mind fluid pack annuli when bringing the well online. Please reply with any questions, Joshua Stephens 2017. Well Integrity Engineer Office: Office: 907-659-8110 Cell: 907-341-9068 WO From: AK, GWO Proje = tegrity Sent: Wednesday, February 22, 20 . M To: AK, GWO SUPT Well Integrity; AK, OPS G 64• AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug -; ;K, GWO SUPT Slickline; AK, GWO SUPT Special Projects; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad EKG; AK, "B East Wells Opt Engr; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; "chris.wallace@alaska.gov' (chris.wallace@alas ..:.v)'; AKIMS App User; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery,Travis 3; Munk, Corey; Obrige Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, OPS FF Well Ops Co : 'ep; Derrick, Laurie R; Daniel, Ryan; AKIMS App User; AK, GWO Completions Well Integrity; AK, OPS FF Well Ops Comp •-: 1 Schlumbepger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage. AK 99503·2838 ATTN: Beth Well MPL-09 S-400A 12-12A G-17A S-400A G-268 C-32C E-04A 07-078 L2-11 E-32A L-04 E-198 2-16/M-16 1-39A1N-16 Job # 11767141 40015442 40015307 40013619 11855508 10942213 11628756 11801079 11216202 11209603 11767130 11603118 11767134 11846803 11628769 $'GANNED OCT 3 1 2001 LOQ Descri~tion MEM INJECTION PROFILE (),(1 Io,n-Ir"\/ OH MWD/LWD EDIT .::>"...,--:+ - ('"1+ '-I · l~ r-..r .,.. OH MWD/LWD EDIT /'I , It"'. "lc::7"r~-+ OH MWD/LWD EDIT ,.Qr'ia- A~{~ 11: /.w::-'.N. CH EDIT PDC GR (USIT) ..::J^-:¡ .r-.-::J.U 1It_ ./'1 MCNL At'o,ç- -('¡'-rR 1:1: /.<:""(" II MCNL ,.:]("')(ð - !,~o, :;;;t1""f_lñ RST JÄ"'Ý-/~ / +t I~,,/")~ MCNL QCG -n5d 12. 1t!:::L^-:2.. MCNL to,-sr -1....Crr_ 'IT I Ç(/)Ot....{ MCNL ,;;)N'\ - I~~ 'lit- JS'~O'd MCNL;::)()w -l~ì -$I. ì J~ MCNL .:::h-:t- - n -::;'''::t ... JS0 U ( RST U-r (\. 1'7f7< - (2,,/....( ;x 1"'\ ÚJ ðO MCNL .!}r,{ I) -I ~-:t-:I:t. "'...... '-'1'-- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petro technical Data Center LR2-1 900 E. Benson Blvd. Anchorage. Alaska 99508 Date Delivered: ~":1-'-f --"(,-" '; ');,)n¡ Date 09/16/07 09/14/07 06/18/07 06/18/07 09118/07 05123105 02/18107 06123/07 06128/06 04130/06 06119107 12130/06 07/21107 08113/07 04/15/07 ;" .;;<~;; ~: '.;, NO. 4449 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe 8ay BL 1 2 3 3 Color CD 1 1 1 1 1 1 1 1 1 1 (1 ì ~ ..+"RA. 'A -- 1 1 1 1 1 1 1 1 1 1 1 1 1 Alaska Data & Consulting Services 2525 Gambell Street. Suite 4 0 Anchorage. AK 99503- 3 A TTN: Beth Received by: 10/19107 . . . !~- ; .- ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ~ 1. Operations Performed: Abandon 0 Alter CasingD Change Approved Program D 2. Operator Suspend 0 RepairWeliD Pull TubingD Operation Shutdown 0 Plug PerforationsD Perforate New Pool D 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time ExtensionD Re-enter Suspended WeliD Milled CIBP 5. Permit to Drill Number: 198-1810 Otherrn Name: BP Exploration (Alaska), Inc. Development ŒJ Stratigraphic D 9. Well Name and Number: E-04A 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool Exploratory 0 ServiceD 6. API Number 50-029-20184-01-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 56.95 8. Property Designation: ADL-0028299 11. Present Well Condition Summary: Total Depth measured 12715 feet true vertical 9044.7 feet Effective Depth measured 12612 feet true vertical 9042.9 feet Plugs (measured) 12650 Junk (measured) 12612 Casing Length Size MD TVD Burst Collapse Conductor 80 20" 94# H-80 28 108 28.0 - 108.0 Liner 1508 7" 26# L-80 8174 - 9682 7571.5 - 8663.2 7240 5410 Liner 3182 4-1/2" 12.6# L-80 9532 - 12714 8560.2 - 9044.7 8430 7500 Production 8321 9-5/8" 47# N-80 26 - 8347 26.0 - 7721.5 6870 4760 Surface 2813 13-3/8" 72# N-80 27 - 2840 27.0 - 2840.0 4930 2670 Perforation depth: Measured depth: 10420 -10470,10600 -10800,11070 -11120,11120 -11170,11670 -11730,12402 -12587 Tubing ( size, grade, and measured depth): True vertical depth: 9040.82 - 9041.4, 9038.82 - 9039.08,9044.86 - 9046.48,9046.48 - 9045.3,9040.23 - 9043.6, 9036.91 - 9042.66 RECEIVED APR 2 8 2004 4-1/2" 12.6# L-80 @ 25 9533 Packers & SSSV (type & measured depth): 4-1/2" Baker SB3 Packer @ 9478 AI~~lta Oil & Gar Cons. Convnit)Sior. Anchorage 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Daily Averaae Production or Iniection Data Gas-Met Water-Bbl Casing Pressure 35.8 191 920 13 2870 38.2 370 757 Tubing Pressure 1800 1597 Prior to well operation: Subsequent to operation: Oil-Bbl 2225 14. Attachments: 15. Well Class after proposed work: ExploratoryD Development ŒI serviceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒJ GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or NIA if C.O. Exempt: N/A Daily Report of Well Operations. ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron jj Cd (LJ~ Title Production Technical Assistant Signature Phone 564-4657 Date 4/23/04 Form 10-404 Revised 12/2003 0 RIG! ~~A L RBDMSBfL APR 2 7 200. - .I - .~ r"\ E-O4A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 04/03/04 Well is flowing on arrival. FWHP = 1760 psig. Shut well in and load with 342 bbls 1% KCL. RIH with Baker 27/8" motor with 3.79" HSD concave mill. Sat down at 11555' ctmd (50' high). Pushed to 11565' ctmd. Started milling. Milled and pushed CIBP to 12587' CTMD (up). RDMO. BBLS 342 10 50 402 FLUIDS PUMPED XS 1% KCL Fie Pro 60/40 Methonal TOTAL Page 1 11/26/03 Schlumberger NO. 3048 Alaska Data & Consulting Services Company: State of Alaska 3940 Arctic Blvd, Suite 300 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-5711 Attn: Lisa Weepie ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color ( Well Job # Log Description Date Blueline Prints CD D.S.15-01A \Y55~r::;;J'A-. 10703946 SCMT 10/31/03 2 NK-62A ~;R '-(\') l\ ~ 10572999 MCNL 05/30/03 1 1 J,.!::J ~j( 0 E-27A ~~1 - 0 p~q 10558568 MCNL 08/09/03 1 1 J~,~i5 G-03A<-f-::¡ -0 "7-"() 10563449 MCNL 06/04/03 1 1 }li~ ¡)../ F-16A } (...\ {() - I (() lì 10558547 MCNL 05/08/03 1 1 ~~~ ~ H-27A /~ 0, ~ --()tC')C1 10700004 MCNL 09/30/03 1 1 ',:p~r:= c E-05A -) <-( \...f ... O,---Sr'J 10672314 RST-SIGMA 09/16/03 1 1 ~ ~ r E.04A ry'ð - \ ~ \ 10662949 RST-SIGMA 09/15/03 1 1 ~4(~-r- ( PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Schlumberger GeoQuest Petrotechnical Data Center LR2-1 3940 Arctic Blvd, Suite 300 900 E. Benson Blvd. r;:) ):: -_.. Anchorage, AK 99503-5711 Anchorage, Alaska 99508 ~1 ,\1 ATTN: Beth DEC ,-. .", . ~~ C. Date Delivered: t.. .::.'. Received by: '\.~ :... .,~-\-) "C ('i. ~(\ '"\,i"\ AJasKii ,..;;. ~. '. ;\nC~'i','~.\ . \~t~~~ElD,' ,"~ArM 2 @ 20Dli. ~~\'f\_~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development __X Explorato~__ Stratigraphic__ Service__ 4. Location of well at surface 1154' FNL, 502' FEL, Sec. 06, T11N, R14E, UM At top of productive interval 4836' FNL, 3801' FEL, Sec. 31, T12N, R14E, UM At effective depth 3796' FNL, 3057' FEL, Sec. 31, T12N, R14E, UM At total depth 3319' FNL, 2063' FEL, Sec. 31, T12N, R14E, UM (asp's 664468, 597591~X (asp's 661129, 5977435) (asp's 661846, 5978491) (asp's 662827, 5978989) 12. Present well condition summary Total depth: measured 12715 feet Plugs (measured) true vertical 9046 feet Effective depth: measured 11604 feet Junk (measured) true vertical 9040 feet Casing Length Size Cemented Conductor 132' 20" 100 sx Surface 2808' 13-3/8" 4388 sx Permafrost 1470 sx Howco Lite & Intermediate 8315' 9-5/8" x 10-3/4" Class 'G" Liner 1508' 7" 293 sx Class 'G' Sidetrack Liner 3157' 4-1/2" 381 sx Class 'G' 6. Datum elevation (DF or KB feet) RKB 57 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number E-04A 9. Permit number / approval number ~J 198-181 10. APl number 50-029-20184-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool CIBP set @ 11604' CIBP set @ 12650' Measured Depth True VerticalDepth 164' 164' 2840' 284O' 8347' 7721' 8174'-9682' 7571'-8663' 9557'-12714' 8577'-9045' Perforation depth: true vertical Open Perfs 9041'-9041', 9039'-9039', 9045'-9045', Perfs Below CIBP 9040'-9044', 9037'-9043' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, TBG @ 9537' MD. Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker 'S-3' Packer @ 9481'. 4-1/2" HES X Nipple @ 2203' MD. measured Open Perfs 10420'-10470', 10600'-10800', 11070'-11170', RECEiVF Perfs Below CIBP 11670'-11730', 12402'-12640'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Dailv Averaqe Production or Iniection Data O~l-Bbl Gas-Mcf Water-Bbl Prior to well operation 01/29/2003 1105 38590 100 Subsequent to operation 02/25/2003 1434 19162 139 Casin.q Pressure Tubin.q Pressure 2034 2130 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations _ Oil __X Gas __ Suspended __ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DeWar/ne R Schnorr ~ Title: Technical Assistant SCA r} 0 ? 2003 Form 10-404 Rev 06/15/88 · Service FEB Date February 26, 2003 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE E-04A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/03/2003 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATi'NG 02/04/2003 PERFORATING: PERFORATING 02/05/2003 PERFORAT~'NG: PERFORATING 02/07/2003 PERFORATING: HOT OIL TREATMENT 02/22/2003 TESTEVENT --- BOPD: 1,776, BWPD: 179, MCFPD: 20,237, AL RATE: 0 EVENT SUMMARY 02/03/203 CTU #5 MEMORY LOG, PERFORATE. RIH WITH 2-7/8" WFD BHA & PDS CCL/GAMMA IN 2-3/8" CARRIER & 2.85" SWAGE. OOH. GOOD LOG DATA. FLAG PIPE @ 10998' AND @ CIBP @ 11604'. PU FIRST 25' 2-7/8" GUN AND PERF FROM 11,145' TO 11,170'. POOH. COIL CONNECTOR LEAKING. RE- HEAD. RIH WITH SECOND 25' GUN AND PERF FROM 11,120' TO 11,145'. POOH. 02/0~03 RIH WITH THIRD 25' GUN AND PERF FROM 11,095' TO 11,120'. POOH. MU NEW MHA. RIH WITH SLB LOGGING TOOLS AND LOG FROM CIBP @ 11604' TO 9700'. RIH WITH FOURTH 25' GUN. CORRECTED FROM CIBP @ 11,597' PU TO 11095' (BOTTOM SHOT). DROPPED BALL AND PERF FROM 11095' TO 11070'. POOH. RIH WITH FIFTH GUN. O2/O5/O3 CORRECT TO CIBP, 11,597' PU TO 10470' (BOTTOM SHOT). DROPPED BALL AND PERF FROM 10,470' TO 10,445'. POOH. RIH WITH SIXTH 25' GUN. CORRECT TO CIBP, PU TO 10,445' (BOTTOM SHOT). DROPPED BALL AND PERF FROM 10,445' TO 10,420'. POOH. PERFORM WEEKLY BOP TEST, CHANGED OUT PACKOFFS, CHAIN INSPECTION, AND CUT PIPE. WEATHER TURNED TO PHASE 2, COULD NOT LOWER MAST. WELL SECURED. GUN INFORMATION: 2-7/8" POWER JET 2906, HSD, HMX, 6 SPF. <<< WELL LEFT SHUT-IN. DSM TO HOOK UP PBGL >>> 02/O7/03 HOT OIL TREATMENT ON FLOWLINE. PUMPED 5 BBLS NEAT, 30 BBLS CRUDE, AND 5 BBLS NEAT. 02/22/03 TESTEVENT --- BOPD: 1,776, BWPD: 179, MCFPD: 20,237, AL RATE: 0 Fluids Pumped BBLS 10 NEAT METHANOL 136 METHANOL 239 60/40 METHANOL WATER 3O CRUDE 255 2% KCL WATER 670 TOTAL Page I ,SCANNED MAI~ 0 7 2003 E-04A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ADD PERFS 02/03-05/2003 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-7/8" HSD PJ-2906, HMX, 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10420'-10470' 11070'-11170' MAE 0 ? 2003 Page 2 STATE OF ALASKA ALASKA-~L AND GAS CONSERVATION CO~¢,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska' 99519-6612 [] Operation Shutdown [] Stimulate [] Plugging ~ Perforate [] Pull Tubing []Alter Casing [] Repair Well [] Other 4. Location of well at surface 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM At top of productive interval 443' NSL, 3801' WEL, SEC. 31, T12N, R14E, UM At effective depth 3346' NSL, 2111' WEL, SEC 31, T12N, R14E, UM At total depth 1960' NSL, 2063' WEL, SEC. 31, T12N, R14E,UM MCNL & Add Perfs well: Type [¢~] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 56.95' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number E-04A 9. Permit Number / Approval No. 198-181 10. APl Number 50- 029-20184-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 12715 feet 9046 feet 11604' feet 9040 feet Length Structural Conductor 104' Surface 2812' Intermediate 8319' Production Liner 1508' Sidetrack Liner 3179' Size Plugs (measured) Junk (measured) KOP (window) 8347' - 8365'. Abandoned 7" from 8611' to 10195', & 9-5/8" from 8347' to 9131' ClBP's set @ 11604' and @ 12650'. Cemented MD TVD 20" 13-3/8" 4388 sx Permfrost 10-3/4" x 9-5/8" 1470 SX Howco Lite & Class 'G' 132' 132' 284O' 2840' 8347' 7722' 7" Sidetrack Liner 4-1/2" 8174'-9682' 7572'-8663' 9535'-12714' 8562'-9045' Perforation depth: measured Open Perfs 10600' - 10800' Below CIBP 11670'- 11730', 12402'- 12640' true vertical Open Perfs 9039' - 9039' Below CIBP 8983' - 8986', 8979' - 8986' Tubing (size, grade, and measured depth) 4-1/2" 12.6#, L-80 tubing to 9481', with 4-1/2" tubing tail @ 9537'. Packers and SSSV (type and measured depth) 7" Baker S3 packer @ 9481'. 4-1/2" HES 'X' Nipple @ 2203'. 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation: Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Subsequent to operation: 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~__~.~ Scott LaVoie - . Title Technical Assistant ~' "- "' ~ Prepared By Name/Number: Date ~//~"'"/d~/' De Wayne ~'hno~ 56,~-5174 Form 10-404 Rev. 06/15/88 Submit In Duplicate., E-04A Description of Work Completed NRWO OPERATIONS 02/21/2001 03/04/2001 03/05/2001 03/05/2001 03/06/2001 03/07/2001 PERF(ADD-PERF): DRIFT & TAG PERF(ADD-PERF): ADD PERF PERF(ADD-PERF): RU IA RELIEF LINE FOR CTU ADD-PERF PERF(ADD-PERF): MEMORY LOG / ADD PERFS PERF(ADD-PERF): MEM LOG / ADD PERF PERF(ADD-PERF): MEMORY LOG / ADD PERFS SUMMARY 02/21/01 RAN 2.875" DUMMY GUN AS DEEP AS POSSIBLE TO 10,325' SLM. QUIT FALLING BECAUSE OF DEVEATION. POOH. RDMO TTS. LEFT WELL S/I & NOTIFIED PAD OPERATOR OF DEPTH & WELL CONDITIONS. 03/04/01 MOVE ON LOCATION. CTU #3 HAS 15108', 1.75" TAPERED STRING. VOL=33.2 BBL. 233K RUNNING FT. SPOT UNIT IN WORK PLATFORM. RU CTU AND SUPPORT EQUIPMENT. 03/05/01 RU RELIEF LINE FROM IA FOR CTU ADD-PERF [Ann Comm] 03/05/01 FINISH PRESSURE TESTING. RUN BOP TEST. KILL WELL. GAGE RUN TO TD OF 12633 OF CTMD. RIH W/ClBP TO 10,605'. DROP BALL. [Perf] 03/06/01 * DAY 3 * PUMP BALL TO SET ClBP. SET ClBP AT 11590'. TAG CIBP. PRESSURE TEST CIBP TO 1500 PSI. CIBP DID NOT TEST. RIH WITH MEMORY GR/CCL. LOG DOWN/UP FROM 9930-11587 CTMD. LAY IN 22 BBLS FLO-PRO. POH. RIH W/200 FT OF 2-7/8" GUNS. [Perf] 03/07/01 * DAY 4 * RIH W/PERF GUNS. PERFORATE 10,600 - 10,800' W/2- 7/8" POWER JETS, 4 SPF. POOH. LD GUNS. RD *** INSTALL POOR BOY GASLIFT AND POP WELL **** [Perf] Fluids Pumped BBLS. Description 1 DIESEL FOR PRESSUER TEST 651 1% KCL WATER 193 60/40 METHANOL 22 FLO-PRO (100,000) 867 TOTAL ADD PERFS 03/07/2001 SUMMARY The following interval was perforated using 2-7/8" HSD Power Jet gun, 4 SPF, random orientation. 10600' - 10800' MD 198-181-0 PRUDHOE BAY UNIT E-04A 50- 029-20184-01 Roll #1: Start: Stop Roll #2: Start Stop MD 12715 TVD 09046 Completion Date: '~0/99 Completed Status: 1-OIL BP EXPLORATION (ALASKA) n,4C Current: Name 9286 ~'224 CBL CNTG DGR/EWR4-MD DGR/EWR4-TVD PROD-SP1N/TEM Interval SCHLUM CNTG 1 ' SCHLUiv~CNWD~ ~ 2-8 SPERRY MPT/GR/EWR4 e.g,'AL 9130_ 11460 '~ 9130-11440 1/12/99 IAL 8378-12714 /,~AL 7748-9044 ~I~AL PRES 11600-12650 R SRVY RPT SPERRY 8300.43-12714. Sent Received T/C/D CH 8/19/99 8/19/99 CH .... 3/_22/00 ~~ --;-~ lO{"..-! -- [ ] c/ OH 7/15/99 7/15/99 CH 5 1/20/99 1/21/99 CH 5 8/19/99 8/19/99 OH 7/15/99 7/15/99 OH 7/15/99 7/I 5/99 CH 5 3/22/00 3/28/00 OH 3/18/99 3/18/99 # Thursday, February 01,2001 Page 1 of 1 GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 121304 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 3/22/00 Well Job # Log Description Date Blueline Sepia Color CD Prints D-07A PSP PROD PROF/GHOST 000318 1 1 E-04A PSP PROD PROF/GHOST 000316 I ! N-15 LEAK DETECTION LOG 000313 1 1 E-15A (REPROCESSED) 20114 CNTD (DEPTH CORRECTED) 970527 1 1 '~-~:~?"C~ 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc, Petrotectnical Data Center MB3-3 900 E, Benson BIvd, Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED MAR 2 8 2000 Alaska 0il & Gas t;o~s. ~,ummtsslon Anchorage Schlumberger GeoQuest 3940 Arctic BIvd, Suite 300 AA~ (~ rhae rgr led ~_~0~.~1- STATE OF ALASKA ALASKA ,,._~. AND GAS CONSERVATION COI~:_~,SSION REPORT OF SUNDRY WELL OPERATIONS il. Operations performed: I 2. Name of Operator 3.BP Exploration (Alaska)Inc. Address I--I Operation Shutdown I--I Stimulate F--I Plugging [~ Perforate r-I Pull Tubing I~Alter Casing [~] Repair Well [] Other P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM At top of productive interval 443' NSL, 3801' WEL, SEC. 31, T12N, R14E, UM At effective depth 3346' NSL, 2111' WEL, SEC. 31, T12N, R14E, UM At total depth 1960' NSL, 2063' WEL, SEC. 31, T12N, R14E, UM i5. Development ] Type[~ well: [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 56.95' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number E-04A 9. Permit Number / Approval No. 198-181 10. APl Number 50- 029-20184-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 12715 feet true vertical 9046 feet Effective depth: measured 12650 feet true vertical 9044 feet Casing Length Size Structural Conductor 104' Surface 2812' Intermediate 9103' Production Liner 1514' Plugs (measured) Junk (measured) Bridge Plug at 9378'; Cement Plug at 9593' (01/98) 270' Coil Tubing Equip. Fish, Top at 9300' (02/98) Cemented MD TVD 20" 13-3/8" 4388 sx Permafrost lO-3/4" x 9-5/8" 1470 sx Howco Lite & Class 'G' 132' 132' 2840' 2840' 9131' 8388' 7" 593 sx Class 'G' 8651' - 10195' 7981' - 9295' Perforation depth: measured 11670'-11730'; 12402'-12640' true vertical 8983'-8986'; 8979'-8986' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Kill String to 2054'; 5-1/2", 17#, L-80 from 8398'- 8565'; 3-1/2", 9.3#, L-80 from 8565' - 9817' Packers and SSSV (type and measured depth) 9-5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9809' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachrnent '~' ~'-'""- : ...... '? -'"7= g Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Prior to well operation: 1621 28589 101 Subsequent to operation: 2268 32000 69 Casing Pressure Tubing Pressure 1386 1554 15. Attachments I 16. Status of well classifications as: [] Copies of Logs and Surveys run I ~c~ ~, r~ ~.,o r~ e ..... ,~,,,~ I I L)ally H/ejo.o.~/~. f wel! upe~,~o s I Ii 7. Ist~e~here, l~.6'~rti,f~hat t~e for~c'o[ng is truce, a~¢~e~rrect to the best of my knowledge , ............. ~i~¢/~~~ ~,,~.,~~ Title TechnicalAssistantlV ,,..,.-~ ~...- .! Prepared By Name/Number: 1 Service Form 10-404 Rev. 06/15/88 E-04A DESCRIPTION OF WORK COMPLETED ADDPERF 10/09/99 SUMMARY The following additional interval were perforated using 2 7/8" guns, 4 SPF, random orientation and 60°/120° phasing. 11670' - 11730' MD GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrle NO. 12769 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 8/19/99 Well Job # Log Description Date Blueline Sepia CD E-04A ~ Z~,~,~ 99184 CNTG 990112 1 1 1 F-28 ~ ~"~ 99305 CNTD 990729 1 1 1 , , ,,, PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 Al'tN: Sherrlo~ 0 C] I::t I I--I-- I N I~ To: State of Alaska Alaska Oil and Gas Conservation Comm. Atto: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs July 15, 1999 E-04A AK-MM-90042 1 LDWG formatted Disc with verification listing. API~: 50-029-20184-01 PLEASE ACKNOWI~DGE RECEIPF BY SIGNING AND RETURNING THE A~FACHED COPIES OF THE TRANSMITFAL LE~ TO THE A~Y_,NTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED Date: ' ~['[- 1 $1999 .Alaska Oii& Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. Petro-tedmical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 si 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 FI I I--I--I I~J 13 SERU'IC~ S To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Conm~. Atm.: Ix)ri Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 ~' {~ ~ ~ MWD Formation Evaluation Logs E-04A, AK-MM-90042 Jay 999 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-20184-01 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-20184-01 1 Blueline t Rolled Sepia t Btueline 1 Rolled Sepia PI,EASE ACKNOWLEDGE RECEIPt BY SIGNING AND RETURNING A COPY OF ~ TRANSMI'ITAL LE~VFER TO THE ATI'ENTION OF: Sperry-Sun Drilling Services Attn: Jan Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED Date: ~...'JL 1 5 1999 Alaska Oil & Gas Cons. Commission .Anchorage BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company '~_~ STATE OF ALASKA -. ALASKA OIL AND GAS CONSERVATION COMMISSION P~ F. C ~lV E ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG MkR 1. Status of Well Classification of Service Well [~ Oil I--] Gas I--I Suspended [~ Abandoned [-I Service &last(a 0il & 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-181 398-328 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20184-01 .... ' .............. ..7:' ': ~ ~~j 9. Unit or Lease Name 4. Location of well at surface i ~"-'-?'~""; :''! ~t,;.~ 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM }~~_~i~ ~i~~~ "~~,. , Prudhoe Bay Unit At top of productive interval 10. Well Number 443' NSL, 3801'WEL, SEC. 31, T12N, R14E, UM i ~)~'~' ~ E-04A At total depth · ~~~ 11. Field and Pool 1960' NSL, 2063' WEL, SEC. 31, T12N, R14E, UM ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in foot (indicate KB, DF, etc.) [6. Lease Designation and Serial No. Pool KBE = 56.95'I ADL 028299 12/19/98 1/11/99 1/30/99 N/A MSLI One 17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12715 9046 FTI 12650 9044 FTI [~]Yes [--~No (Nipple) 2203' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, USIT, CBL, CCL 23. CASING~ LINER AND CEMENTING RECORD CASING SEI-I-ING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'Iq-OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 132' 26" 100 sx 13-3/8" 72# N-80 Surface 2840' 18-1/2" 4388 sx Permafrost * 9-5/8" 47# N-80 Surface 8347' 12-1/4" 1470 sx Howco Lite & Class 'G' * 9-5/8" x 10-3/4" 7" 26# L-80 8174' 9682' 8-1/2" 293 sx Class 'G' 4-1/2" 12.6# L-80 9557' 12714' 6" 381 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 9537' 9481' MD TVD MD TVD 12402' - 12640' 9037' - 9043' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ~,, 9655' - 9657' Cmt Sqz Perf's for Remedial 4-1/2" Cmt Sqz with 80 Bbls Class 'G' 9655' - 9657' Crnt Perf Squeeze w/10 Bbls Crnt, Sqzd 2600 psi Freeze Protect with 30 Bbls MEOH 27. PRODUCTION TEST DateFebruaryFirst Production21, 1999 !Meth°dFIOwinD°f Operation (Flowing, gas lift, etc.) Il L Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL O~L GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ~si.0t~ Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. .--, Sag River 9680' 8662' Shublik 9755' 8712' Shublik 'B' 9793' 8736' Shublik 'C' 9807' 8745' Top of Sadlerochit 9825' 8756' Zone 4A 9886' 8794' Zone 3 9972' 8848' Zone 2C 10056' 8899' Zone 2B 10144' 8948' §1. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and ~;orrect to the best of my knowledge TerrieHubble , Title Technical Assistant ,1, Date 0;~' 1~¢~ E~04A 98-181 398-328 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. ..... INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1.' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 RECEIVED MAR ! 8 1999 Oil 8, 8as Oons, Oommissior~ Anchorage Progress Report Facility PB E Pad Well E-04A Page 1 Rig Nabors 7ES Date 10 February 99 Date/Time 20 Oct 98 09:00-09:15 09:15-10:00 10:00-12:30 12:30-17:00 17:00-17:30 17:30-18:00 18:00-18:15 18:15-18:30 18:30-20:00 20:00-21:00 21:00-22:00 22:00-23:30 23:30-03:00 21 Oct 98 03:00-03:30 03:30-06:00 06:00-08:30 08:30-09:00 09:00-11:30 11:30-12:30 12:30-13:30 13:30-16:30 16:30-03:00 22 Oct 98 03:00-05:00 05:00-06:00 06:00-08:00 08:00-11:45 11:45-12:45 12:45-13:00 13:00-14:15 14:15-15:00 15:00-17:30 17:30-22:45 22:45-23:00 23:00-01:00 23 Oct 98 01:00-02:00 02:00-02:30 02:30-02:45 02:45-06:00 06:00-06:45 06:45-07:15 07:15-08:00 08:00-11:45 11:45-12:00 12:00-13:00 13:00-15:00 15:00-16:00 16:00-16:30 16:30-20:30 20:30-21:30 21:30-22:30 22:30-00:00 24 Oct 98 00:00-02:00 02:00-04:00 04:00-04:30 Duration 1/4 hr 3/4 hr 2-1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 1/4 hr 1/4 hr 1-1/2 hr lhr 1 hr 1-1/2 hr 3-1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr lhr lhr 3hr 10-1/2 hr 2hr lhr 2hr 3-3/4 hr lhr 1/4 hr 1-1/4 hr 3/4 hr 2-1/2 hr 5-1/4 hr 1/4 hr 2hr lhr 1/2 hr 1/4 hr 3-1/4 hr 3/4 hr 1/2 hr 3/4 hr 3-3/4 hr 1/4 hr lhr 2hr lhr 1/2 hr 4hr lhr lhr 1-1/2 hr 2hr 2hr 1/2 hr Activity Held safety meeting Rigged down Drillfloor / Derrick Installed Rig services Rig moved 100.00 % Rigged down Swab cap Removed Hanger plug Held safety meeting Rigged up Lubricator Installed Hanger plug Installed BOP stack Installed Hanger plug Rigged down Xmas tree Rigged up BOP stack Rigged up High pressure lines Tested BOP stack Tested BOP stack (cont...) Rigged down High pressure lines Removed Hanger plug Rigged up Bell nipple Freeze protect well - 150.000 bbl of Diesel Made up BHA no. 1 Singled in drill pipe to 9288.0 ft Circulated at 9288.0 ft Fished at 9288.0 ft Fished at 9288.0 ft (cont...) Pulled out of hole to -0.0 ft Held safety meeting Laid down fish Laid down 824.0 ft of 2-1/16in OD drill pipe Rigged down Tubing handling equipment R.I.H. to 8121.0 ft Laid down 8121.0 ft of 2-7/8in OD drill pipe Held safety meeting Laid down 450.0 ft of 2-7/8in OD drill pipe Rigged down Drillstring handling equipment Tested Casing head Held safety meeting Conducted electric cable operations Conducted electric cable operations (cont...) Fished at 35.0 ft Rigged down Tubing hanger Circulated at 8414.0 ft Removed Sub sea tools Rigged up Logging/braided cable equipment Conducted electric cable operations Fished at 8525.0 ft Held safety meeting Conducted electric cable operations Installed Slickline unit Installed Slickline unit Conducted slickline operations on Slickline equipment - Tool run Rigged up Rigging equipment Rigged up Logging/braided cable equipment Rigged up Rigging equipment Progress Report Facility PB E Pad Well E-04A Page 2 Rig Nabors 7ES Date 10 February 99 Date/Time 25 Oct 98 26 Oct 98 04:30-05:00 05:00-06:00 06:00-07:00 07:00-08:30 08:30-13:00 13:00-18:00 18:00-18:15 18:15-19:30 19:30-19:45 19:45-21:00 21:00-21:15 21:15-22:00 22:00-22:15 22:15-22:30 22:30-23:00 23:00-23:30 23:30-23:45 23:45-02:30 02:30-03:00 03:00-03:15 03:15-06:00 06:00-06:45 06:45-07:15 07:15-08:30 08:30-09:15 09:15-09:30 09:30-10:00 10:00-10:30 10:30-19:00 19:00-19:30 19:30-22:00 22:00-00:00 00:00-04:00 04:00-04:30 04:30-05:00 05:00-06:00 06:00-09:00 09:00-09:15 09:15-09:30 09:30-09:45 09:45-10:30 10:30-10:45 10:45-12:30 12:30-14:30 14:30-14:45 14:45-15:00 15:00-16:00 16:00-16:15 16:15-16:30 16:30-20:30 20:30-20:45 20:45-21:30 21:30-21:45 21:45-01:00 Duration 1/2 hr lhr lhr 1-1/2 hr 4-1/2 hr 5hr 1/4 hr 1-1/4 hr 1/4 hr 1-1/4 hr 1/4 hr 3/4 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1/4 hr 2-3/4 hr 1/2 hr 1/4 hr 2-3/4 hr 3/4 hr 1/2 hr 1-1/4 hr 3/4 hr 1/4 hr 1/2 hr 1/2hr 8-1/2 hr 1/2 hr 2-1/2 hr 2hr 4 hr 1/2hr 1/2 hr lhr 3hr 1/4 hr 1/4 hr 1/4 hr 3/4 hr 1/4 hr 1-3/4 hr 2 hr 1/4 hr 1/4 hr lhr 1/4 hr 1/4 hr 4hr 1/4 hr 3/4 hr 1/4 hr 3-1/4 hr Activity Held safety meeting Conducted electric cable operations Conducted electric cable operations (cont...) Conducted electric cable operations Fished at 33.0 ft Fished at 33.0 ft Held safety meeting Removed BOP stack Held safety meeting Removed Hanger plug Held safety meeting Rigged up BOP stack Held safety meeting Fished at 100.0 ft Conducted electric cable operations Tested BOP stack Held safety meeting Conducted electric cable operations Rigged down sub-surface equipment - Other sub-surface equipment Held safety meeting Laid down Tubing of 8398.0 ft Laid down 8398.0 ft of Tubing (cont...) Rigged down Completion string handling equipment Installed Emergency hang off assembly Installed Hanger plug Tested Blind ram Retrieved Hanger plug Retrieved Emergency hang off assembly Laid down 1125.0 ft of 5in OD drill pipe Held safety meeting Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Tested Well control Held safety meeting Ran Tubing to 4-1/2in (2054.0 ft OD) Ran Tubing to 2054.0 ft (4-1/2in OD) (cont...) Installed Hanger plug Tested Hanger plug Held safety meeting Serviced Pipe ram Held safety meeting Removed BOP stack Installed Xmas tree Tested Xmas tree Retrieved Hanger plug Freeze protect well - 145.000 bbl of Diesel Installed Hanger plug Functioned %s Rigged down Drillfloor / Derrick Held safety meeting Skid rig Held safety meeting Rig moved 100.00 % Progress Report Facility PB E Pad Well E-04A Rig Nabors 7ES Page 3 Date 10 February 99 Date/Time 27 Oct 98 28 Oct 98 29 Oct 98 30 Oct 98 01:00-01:30 01:30-06:00 06:00-06:00 06:00-21:00 21:00-06:00 06:00-07:00 07:00-01:00 01:00-06:00 06:00-00:00 Duration 1/2 hr 4-1/2 hr 24 hr 15hr 9hr lhr 18hr 5hr 18hr Activity Skid rig Rigged down Fluid system Rigged down Fluid system (cont...) Rigged down Fluid system (cont...) Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick (cont...) Rig moved 100.00 % Rigged up Rig services Rigged down Drillfloor / Derrick Progress Report Facility PB E Pad Well E-04A Rig Nabors 7ES Page 1 Date 10 February 99 Date/Time 14 Dec 98 00:00-06:00 06:00-06:00 15 Dec 98 06:00-12:00 12:00-12:30 12:30-00:00 16 Dec 98 00:00-00:30 00:30-06:00 06:00-10:00 10:00-10:30 10:30-14:30 14:30-18:30 18:30-19:30 19:30-22:00 22:00-00:00 17 Dec 98 00:00-05:00 05:00-06:00 06:00-08:30 08:30-09:30 09:30-11:00 11:00-12:00 12:00-12:15 12:15-13:30 13:30-14:00 14:00-17:00 17:00-18:00 18:00-18:30 18:30-00:00 18 Dec 98 00:00-06:00 06:00-09:00 09:00-09:30 09:30-12:00 12:00-12:30 12:30-13:30 13:30-14:00 14:00-20:30 20:30-21:00 21:00-23:30 23:30-03:00 19 Dec 98 03:00-05:30 05:30-06:00 06:00-08:00 08:00-08:30 08:30-10:00 10:00-10:30 10:30-11:00 11:00-11:30 11:30-14:00 14:00-18:30 18:30-20:00 20:00-06:00 20 Dec 98 06:00-07:30 07:30-08:00 08:00-10:30 10:30-11:00 Duration 6hr 24 hr 6hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 4hr 1/2 hr 4hr 4hr lhr 2-1/2 hr 2hr 5hr lhr 2-1/2 hr lhr 1-1/2 hr lhr 1/4 hr 1-1/4 hr 1/2 hr 3hr lhr 1/2 hr 5-1/2 hr 6hr 3hr 1/2 hr 2-1/2 hr 1/2 hr lhr 1/2 hr 6-1/2 hr 1/2 hr 2-1/2 hr 3-1/2 hr 2-1/2 hr 1/2 hr 2hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 4-1/2 hr 1-1/2 hr 10hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr Activity Rig moved 10.00 % Rig moved 75.00 % (cont...) Rig moved 75.00 % (cont...) Held safety meeting Rig moved 90.00 % Held safety meeting Rig moved 99.00 % Rig moved 100.00 % (cont...) Held safety meeting Rigged down Xmas tree Rigged up BOP stack Tested Slip & seal assembly Installed Hanger plug Rigged up Service lines Tested BOP stack Rigged up Tubing handling equipment Repaired Top drive pipe handler Retrieved Tubing hanger Reverse circulated at 2017.0 ft Laid down 766.5 ft of Tubing Held safety meeting Laid down 1250.0 ft of Tubing Rigged down Tubing handling equipment Tested Bottom ram Made up BHA no. 2 Repaired Well control Made up BHA no. 2 R.I.H. to 5297.0 ft R.I.H. to 8315.0 ft (cont...) Held safety meeting Circulated at 8315.0 ft Held drill (Abandonment) Circulated at 8315.0 ft R.I.H. to 8377.0 ft Milled Casing at 8378.0 ft Reamed to 8378.0 ft Circulated at 8347.0 ft Pulled out of hole to 1006.0 ft Pulled BHA Cleared Flowline Made up BHA no. 3 Functioned M.W.D. tool Made up BHA no. 3 Held safety meeting Serviced Top drive Made up BHA no. 3 Singled in drill pipe to 2770.0 ft R.I.H. to 8365.0 ft Repaired Top drive Drilled to 8600.0 ft Drilled to 8621.0 ft (cont...) Pulled out of hole to 8282.0 ft Repaired Top drive R.I.H. to 8563.0 ft Progress Report Facility PB E Pad Well E-04A - Rig Nabors 7ES Page 2 Date 10 February 99 Date/Time 11:00-11:30 11:30-13:00 13:00-14:30 14:30-06:00 21 Dec 98 06:00-06:00 22 Dec 98 06:00-11:00 11:00-15:00 15:00-15:30 15:30-16:00 16:00-20:00 20:00-21:30 21:30-22:30 22:30-23:30 23:30-01:00 23 Dec 98 01:00-05:30 05:30-06:00 06:00-18:00 18:00-21:30 21:30-22:30 22:30-23:00 23:00-02:00 24 Dec 98 02:00-02:30 02:30-06:00 06:00-07:00 07:00-09:30 09:30-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-13:10 13:10-13:45 13:45-14:00 14:00-15:30 15:30-18:00 18:00-20:30 20:30-23:30 23:30-00:00 25 Dec 98 00:00-04:00 04:00-04:30 04:30-05:30 05:30-06:00 06:00-10:00 10:00-10:30 10:30-12:00 12:00-12:30 12:30-17:00 17:00-17:30 17:30-21:00 21:00-22:00 22:00-00:30 26 Dec 98 00:30-02:00 02:00-02:30 02:30-03:30 03:30-04:00 Duration 1/2 hr 1-1/2 hr 1-1/2 hr 15-1/2 hr 24 hr 5hr 4hr 1/2 hr 1/2 hr 4hr 1-1/2 hr lhr lhr 1-1/2 hr 4-1/2 hr 1/2 hr 12hr 3-1/2 hr lhr 1/2 hr 3hr 1/2 hr 3-1/2 hr lhr 2-1/2 hr 1-1/2 hr lhr 1/2 hr 1/2hr 0hr 1/2 hr 1/4 hr 1-1/2 hr 2-1/2 hr 2-1/2 hr 3hr 1/2 hr 4hr 1/2 hr lhr 1/2 hr 4 hr 1/2 hr 1-1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 3-1/2 hr lhr 2-1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr Activity Washed to 8621.0 ft Drilled to 8678.0 ft Repaired Top drive Drilled to 9050.0 ft Drilled to 9530.0 ft (cont...) Drilled to 9683.0 ft (cont...) Circulated at 9683.0 ft Pulled out of hole to 9497.0 ft Reamed to 9683.0 ft Circulated at 9683.0 ft Pulled out of hole to 9228.0 ft Circulated at 9030.0 ft Pulled out of hole to 8345.0 ft R.I.H. to 9683.0 ft Circulated at 9683.0 ft Pulled out of hole to 9497.0 ft Pulled out of hole to 908.0 ft (cont...) Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Liner to 1509.0 ft (7in OD) Circulated at 1509.0 ft Ran Liner on landing string to 5425.0 ft Ran Liner on landing string to 8330.0 ft (cont...) Circulated at 8330.0 ft Ran Liner on landing string to 9683.0 ft Circulated at 9683.0 ft Held safety meeting Pumped Fresh water spacers - volume 70.000 bbl Mixed and pumped slurry - 60.000 bbl Displaced slurry - 135.000 bbl Circulated at 8173.0 ft Circulated at 8172.0 ft Rigged down Additional services Pulled Drillpipe in stands to 667.0 ft Laid down 647.0 ft of HWDP Rigged down sub-surface equipment - Setting tools Tested BOP stack Serviced Top drive Repaired Top drive Serviced Kelly cocks Made up BHA no. 4 Serviced Block line Rig waited · Other delays Serviced Block line Singled in drill pipe to 3030.0 ft Serviced Bell nipple R.I.H. to 9565.0 ft Circulated at 9565.0 ft Drilled installed equipment - Landing collar Circulated at 9639.0 ft Tested Liner Drilled installed equipment - Float shoe ' Drilled to 9703.0 ft Progress Report Facility PB E Pad Well E-04A Page 3 Rig Nabors 7ES Date 10 February 99 Date/Time 04:00-04:30 04:30-06:00 06:00-02:00 27 Dec 98 02:00-04:00 04:00-06:00 06:00-09:00 09:00-10:30 10:30-12:00 12:00-12:30 12:30-14:00 14:00-15:00 15:00-19:30 19:30-21:30 21:30-22:30 22:30-00:00 28 Dec 98 00:00-06:00 06:00-05:00 29 Dec 98 05:00-06:00 06:00-06:30 06:30-07:30 30 Dec 98 31 Dec 98 01 Jan 99 07:30-12:30 12:30-14:00 14:00-16:30 16:30-17:30 17:30-22:30 22:30-23:30 23:30-06:00 06:00-18:00 18:00-19:00 19:00-21:30 21:30-22:00 22:00-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-05:00 05:00-05:30 05:30-06:00 06:00-07:00 07:00-07:30 07:30-11:00 11:00-15:00 15:00-16:00 16:00-16:30 16:30-06:00 06:00-09:30 09:30-11:00 11:00-13:00 13:00-14:00 14:00-14:30 Duration 1/2 hr 1-1/2 hr 20 hr 2hr 2hr 3hr 1-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr lhr 4-1/2 hr 2hr lhr 1-1/2 hr 6hr 23 hr lhr 1/2 hr lhr 5hr 1-1/2 hr 2-1/2 hr lhr 5hr lhr 6-1/2 hr 12 hr lhr 2-1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 3-1/2 hr 4hr lhr 1/2 hr 13-1/2 hr 3-1/2 hr 1-1/2 hr 2hr Activity Circulated at 9703.0 ft Drilled to 9750.0 ft Drilled to 10324.0 ft (cont...) Circulated at 10324.0 ft Pulled out of hole to 7930.0 ft Pulled out of hole to 230.0 ft (cont...) Pulled BHA Made up BHA no. 4 Serviced Top drive Repaired Top drive Singled in drill pipe to 789.0 ft R.I.H. to 9660.0 ft Serviced Block line R.I.H. to 10030.0 ft Washed to 10324.0 ft Drilled to 10471.0 ft Drilled to 10930.0 ft (cont...) Circulated at 10930.0 ft Circulated at 10930.0 ft Logged hole with LWD: Formation evaluation (FE) from 10930.0 ft to 10405.0 ft Pulled out of hole to 231.0 ft Pulled BHA Made up BHA no. 6 Serviced Top drive R.I.H. to 10780.0 ft Washed to 10930.0 ft Drilled to 11090.0 ft Drilled to 11510.0 ft (cont...) Circulated at 11510.0 ft Logged hole with LWD: Formation evaluation (FE) from 11510.0 ft to 10981.0 ft Rig waited · Assessed situation Logged hole with LWD: Formation evaluation (FE) from 10981.0 ft to 10650.0 ft Pulled out of hole to 9650.0 ft Serviced Block line Held safety meeting Pulled out of hole to 231.0 ft Pulled BHA Downloaded MWD tool Made up BHA no. 7 Serviced Top drive R.I.H. to 9659.0 ft Repaired Mud pump power end R.I.H. to 11435.0 ft Washed to 11510.0 ft Drilled to 11808.0 ft Drilled to 11936.0 ft (cont...) Circulated at 11936.0 ft Logged hole with LWD: Formation evaluation (FE) from 11936.0 ft to 11435.0 ft Pulled out of hole to 9659.0 ft Held safety meeting Progress Report Facility PB E Pad Well E-04A Page 4 Rig Nabors 7ES Date 10 February 99 Date/Time 02 Jan 99 03 Jan 99 04 Jan 99 05 Jan 99 06 Jan 99 14:30-19:00 19:00-20:30 20:30-21:00 21:00-21:30 21:30-22:30 22:30-01:00 01:00-01:30 01:30-02:00 02:00-04:30 04:30-06:00 06:00-09:00 09:00-10:00 10:00-11:00 11:00-11:30 11:30-12:00 12:00-13:30 13:30-14:00 14:00-22:00 22:00-23:00 23:00-23:30 23:30-01:30 01:30-02:00 02:00-06:00 06:00-07:00 07:00-07:30 07:30-09:30 09:30-15:30 15:30-06:00 06:00-18:00 18:00-19:30 19:30-21:00 21:00-21:30 21:30-23:30 23:30-00:00 00:00-02:00 02:00-03:00 03:00-06:00 06:00-07:30 07:30-10:00 10:00-11:00 11:00-11:30 11:30-12:00 12:00-17:00 17:00-17:30 17:30-22:30 22:30-23:30 23:30-02:30 02:30-03:00 03:00-05:00 05:00-06:00 06:00-06:30 06:30-13:00 13:00-13:15 Duration 4-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr lhr 2-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1-1/2 hr 3hr lhr lhr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 8hr lhr 1/2 hr 2hr 1/2 hr 4hr lhr 1/2 hr 2hr 6 hr 14-1/2 hr 12hr 1-1/2 hr 1-1/2 hr 1/2 hr 2hr 1/2hr 2hr lhr 3hr 1-1/2 hr 2-1/2 hr 1 hr 1/2 hr 1/2 hr 5hr 1/2 hr 5hr 1 hr 3hr 1/2 hr 2hr lhr 1/2 hr 6-1/2 hr 1/4 hr Activity Pulled out of hole to 231.0 ft Pulled BHA Retrieved Wear bushing Installed BOP test plug assembly Tested Choke manifold Tested All functions Retrieved BOP test plug assembly Installed Wear bushing Made up BHA no. 8 R.I.H. to 1000.0 ft R.I.H. to 9658.0 ft (cont...) Serviced Block line Serviced Top drive R.I.H. to 9906.0 ft Took MWD survey at 9906.0 ft R.I.H. to 11850.0 ft Washed to 11936.0 ft Drilled to 12110.0 ft Circulated at 12110.0 ft Logged hole with LWD: Formation evaluation (FE) from 12110.0 ft to 11900.0 ft Pulled out of hole to 9650.0 ft Circulated at 9650.0 ft Pulled out of hole to 231.0 ft Pulled BHA Downloaded MWD tool Made up BHA no. 9 R.I.H. to 12110.0 ft Drilled to 12335.0 ft Drilled to 12714.0 ft Circulated at 12714.0 ft Pulled out of hole to 11800.0 ft R.I.H. to 12714.0 ft Circulated at 12714.0 ft Circulated at 12714.0 ft Pulled out of hole to 9865.0 ft Serviced Block line Pulled out of hole to 3000.0 ft Pulled out of hole to 1800.0 ft Pulled BHA Held safety meeting Rigged up Casing handling equipment Held safety meeting Ran Liner to 3200.0 ft (4-1/2in OD) Circulated at 3200.0 ft Ran Liner in stands to 9624.0 ft Held safety meeting Circulated at 9624.0 ft Rigged up Cement head Ran Liner in stands to 12704.0 ft Circulated at 12704.0 ft Circulated at 12704.0 ft Circulated at 12714.0 ft Held safety meeting Progress Report Facility PB E Pad Well E-04A Rig Nabors 7ES Page 5 Date 10 February 99 Date/Time 07 Jan 99 08 Jan 99 09 Jan 99 10 Jan 99 11 Jan 99 13:15-13:30 13:30-13:35 13:35-13:50 13:50-13:55 13:55-14:20 14:20-14:35 14:35-15:15 15:15-15:55 15:55-16:00 16:00-17:00 17:00-20:00 20:00-20:30 20:30-00:00 00:00-06:00 06:00-09:30 09:30-10:00 10:00-11:00 11:00-14:30 14:30-15:30 15:30-18:00 18:00-22:00 22:00-22:30 22:30-00:30 00:30-03:30 03:30-06:00 06:00-07:30 07:30-09:00 09:00-12:30 12:30-13:30 13:30-18:30 18:30-19:30 19:30-21:30 21:30-00:00 00:00-01:00 01:00-02:00 02:00-06:00 06:00-12:00 12:00-15:30 15:30-16:30 16:30-18:30 18:30-19:00 19:00-21:00 21:00-22:00 22:00-23:30 23:30-05:00 05:00-06:00 06:00-11:00 11:00-06:00 06:00-08:30 08:30-09:30 09:30-10:30 10:30-11:00 11:00-11:30 11:30-14:00 Duration 1/4 hr 0hr 1/4 hr 0hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 0 hr lhr 3hr 1/2 hr 3-1/2 hr 6hr 3-1/2 hr 1/2 hr lhr 3-1/2 hr lhr 2-1/2 hr 4hr 1/2 hr 2hr 3hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr lhr 5hr lhr 2 hr 2-1/2 hr lhr lhr 4hr 6hr 3-1/2 hr lhr 2hr 1/2 hr 2hr lhr 1-1/2 hr 5-1/2 hr lhr 5hr 19hr 2-1/2 hr lhr lhr 1/2 hr 1/2 hr 2-1/2 hr Activity Tested Cement head Pumped Water based mud spacers - volume 20.000 bbl Mixed and pumped slurry - 78.000 bbl Cleared Cement head Displaced slurry - 94.500 bbl Displaced slurry - 143.000 bbl Retrieved downhole equipment - Retrievable packer Retrieved downhole equipment - Retrievable packer Circulated at 9530.0 ft Retrieved downhole equipment - Retrievable packer Circulated at 9300.0 ft Cleared Cement head Retrieved downhole equipment - Retrievable packer Cleared Kelly/top drive hose Cleared Kelly/top drive hose Serviced Block line Made up BHA no. 10 R.I.H. to 7835.0 ft Reamed to 7895.0 ft Circulated at 7895.0 ft Pulled out of hole to 300.0 ft Pulled BHA Made up BHA no. 11 R.I.H. to 7835.0 ft Drilled cement to 7835.0 ft Drilled cement to 8173.0 ft Circulated at 8173.0 ft Pulled out of hole to 350.0 ft Pulled BHA Tested All functions Installed Handling equipment Made up BHA no. 12 R.I.H. to 5330.0 ft Serviced Block line R.I.H. to 8173.0 ft Drilled cement to 8650.0 ft Drilled cement to 9536.0 ft Circulated at 9536.0 ft Tested Liner - Via string Pulled out of hole to 5300.0 ft Serviced Top drive motor Pulled out of hole to 350.0 ft Pulled BHA Installed Drillstring handling equipment Made up BHA no. 13 Removed Drillstring handling equipment R.I.H. to 10865.0 ft Drilled cement to 11900.0 ft Drilled cement to 12050.0 ft Washed to 12627.0 ft Drilled installed equipment - Landing collar Circulated at 12669.0 ft Drilled installed equipment - Float collar Repaired BOP stack Facility PB E Pad Progress Report Well E-04A Page Rig Nabors 7ES Date 6 10 February 99 Date/Time 12 Jan 99 13 Jan 99 14 Jan 99 15 Jan 99 14:00-15:00 15:00-20:30 20:30-02:00 02:00-06:00 06:00-06:30 06:30-07:00 07:00-09:00 09:00-09:30 09:30-11:30 11:30-15:00 15:00-15:30 15:30-16:00 16:00-21:30 21:30-22:30 22:30-01:00 01:00-04:00 04:00-06:00 06:00-06:30 06:30-08:00 08:00-10:30 10:30-11:00 11:00-13:00 13:00-14:00 14:00-18:00 18:00-21:00 21:00-21:30 21:30-03:00 03:00-04:00 04:00-06:00 06:00-12:00 12:00-12:40 12:40-12:45 12:45-12:50 12:50-13:15 13:15-14:30 14:30-17:30 17:30-20:00 20:00-22:30 22:30-23:00 23:00-23:30 23:30-00:00 00:00-03:00 03:00-03:15 03:15-03:30 03:30-04:00 04:00-06:00 06:00-09:00 09:00-10:00 10:00-10:30 10:30-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-14:30 Duration lhr 5-1/2 hr 5-1/2 hr 4hr 1/2 hr 1/2 hr 2hr 1/2 hr 2 hr 3-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr lhr 2-1/2 hr 3hr 2hr 1/2 hr 1-1/2 hr 2-1/2 hr 1/2 hr 2hr lhr 4hr 3hr 1/2 hr 5-1/2 hr 1 hr 2hr 6hr 1/2 hr 0hr 0hr 1/4 hr 1-1/4 hr 3hr 2-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 3 hr 1/4 hr 1/4 hr 1/2 hr 2hr 3hr lhr 1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 1-1/2 hr Activity Drilled installed equiPment - Float shoe Circulated at 12715.0 ft Circulated at 12715.0 ft Pulled out of hole to 2500.0 ft Rigged down Block line Installed Drillstring handling equipment Pumped out of hole to 100.0 ft Pulled BHA Conducted electric cable operations R.I.H. to 3270.0 ft Held safety meeting Serviced Top drive R.I.H. to 9159.0 ft Installed DST surface equipment R.I.H. to 9159.0 ft Ran logs on tubulars Ran logs on tubulars Ran logs on tubulars Pulled out of hole to -0.0 ft Pulled out of hole to 3200.0 ft Rigged up Drillstring handling equipment Pulled out of hole to -0.0 ft Rigged down sub-surface equipment - Downhole tools Conducted electric cable operations Rigged up sub-surface equipment - Cement retainer Rigged down Drillstring handling equipment Ran Drillpipe in stands to 11515.0 ft Installed Cement retainer Circulated at 11468.0 ft Circulated at 11468.0 ft Batch mixed slurry - 80.000 bbl Tested Cement head Pumped Brine spacers - volume 20.000 bbl Mixed and pumped slurry - 80.000 bbl Displaced slurry - 102.000 bbl Circulated at 11460.0 ft Pulled out of hole to 3250.0 ft Pulled out of hole to -0.0 ft Retrieved Cement retainer Retrieved Wear bushing Installed BOP test plug assembly Tested BOP stack Retrieved BOP test plug assembly Installed Wear bushing Made up BHA no. 14 R.I.H. to 4000.0 ft R.I.H. to 9240.0 ft Serviced Block line Serviced Top drive R.I.H. to 9536.0 ft Washed to 9536.0 ft R.I.H. to 11468.0 ft Drilled installed equipment - Cement retainer Washed to 11700.0 ft Facility PB E Pad Progress Report Well E~04A Rig Nabors 7ES Page Date 7 10 February 99 Date/Time 16 Jan 99 17 Jan 99 18 Jan 99 14:30-23:00 23:00-03:30 03:30-06:00 06:00-08:00 08:00-18:00 18:00-18:30 18:30-19:00 19:00-20:00 20:00-21:00 21:00-21:30 21:30-22:00 22:00-22:30 22:30-01:00 01:00-01:30 01:30-02:30 02:30-03:00 03:00-06:00 06:00-14:00 14:00-17:00 17:00-19:00 19:00-20:00 20:00-21:00 21:00-22:00 22:00-02:00 02:00-06:00 06:00-06:30 06:30-08:00 08:00-09:30 09:30-10:00 10:00-12:00 Duration 8-1/2 hr 4-1/2 hr 2-1/2 hr 2hr 10hr 1/2 hr 1/2 hr lhr 1 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr lhr 1/2 hr 3hr 8hr 3hr 2hr lhr 1 hr lhr 4hr 4hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 2hr Activity Drilled cement to 12664.0 ft Circulated at 12664.0 ft Circulated at 12664.0 ft Circulated at 12664.0 ft Laid down 9500.0 ft of 4in OD drill pipe Serviced Top drive Rigged up Drillstring handling equipment Repaired Draw works Laid down 3150.0 ft of 2-7/8in OD drill pipe Serviced Drillstring handling equipment Laid down 2100.0 ft of 2-7/8in OD drill pipe Repaired Drillstring handling equipment Laid down 1200.0 ft of 2-7/8in OD drill pipe Removed Wear bushing Removed Drillstring handling equipment Installed Tubing handling equipment Ran Tubing to 2500.0 ft (4-1/2in OD) Ran Tubing to 9537.0 ft (4-1/2in OD) Circulated at 9537.0 ft Tested Liner - Via string Stung into Tie back packer Set packer at 9480.5 ft with 3500.0 psi Tested Production packer - Via annulus Rigged down BOP stack Installed Xmas tree Installed Xmas tree (cont...) Retrieved Hanger plug Freeze protect well - 210.000 bbl of Diesel Installed Hanger plug Cleared Mud pumps Well: E-04A Accept: 01/25/99 Field: Prudhoe Bay Spud: N/A APl: 50-029-20184-01 Release: 02/02/99 Permit: 98-181 CTD Unit: Nordic #1 Date Day Depth 01/26/99 1 Nordic #1 rig on stand-by while WOW from 20:00 hrs, 1/24 to 13:00 hrs, 1/25/99. Move rig from G pad to E pad. Accept rig on E-04a well at 17:00 hrs, 1/25/99. N/U BOP stack. Position green tank. R/U hardline. Perform initial BOP pressure test and fax test form to AOGCC. TIH w/PDS Memory Logging Tools, tagged up at 9570' CTM. Pump to wash thru and got gas to surface. Circulate out gas on choke and attempt to work past tight spot--no success. Circulate out gas and POOH and PU mill and motor 01/27/99 2 RIH with 3.73" mill. Ream liner clean with no problem to TD at 12700' CTD. POOH. LD mill and motor. RIH with PDS Memory GR/CCL and 3.63" tapered swage to TD at 12723' CTD. Log from TD to 9300'. POOH. LD logging tools. RIH with Baker 3.56" ClBP. Tie in to flag and correct depth to MWD. Perform injectivity tests at 0.4 BPM @ 1300 psi and 0.8 BPM at 1870 psi. Set ClBP at 12650'. Perform injectivity tests at 0.4 BPM @ 1690 psi and 0.8 BPM at 1940 psi. Assume liner lap squeeze perfs are leaking. Lay FIo Pro in liner while POOH for cementing BHA. LD setting tool. Pump wiper dart through CT. MU cementing BHA. RIH with BHA #5 (nozzle and 2 its tbg). 01/28/99 3 RIH with Cement NZL. Corrected depth at CT weld. RIH and stopped at 9685' to check traction motor to CT power pack hydraulics. Circulate to keep CT warm. Begin Rig Repair on DS Power Pack at 0900 hrs. RU to change out Power Pack Traction Motor. Armature brushes gone and insulation is melted. Prep new traction motor in DS shop. Open pipe shed roof. Change out traction motor using Peak 140T crane (-29°). Install new motor and rewire. 01/29/99 4 Wired Traction Motor on Power Pack. Fired up and tested. Good. Called for cement. Performed injectivity test. Qp = 0.6 BPM at 1544 psi and reduced to 1440 psi in 10 bbls. Held Safety and Operational Meeting. Batch up cement. Pumped 10 bbl of 16.4 ppg cement, displaced and layed from 9685' to 9000' at 1:1 ratio. Squeezed to 2600 psi. Washed cement down to 9550' at 3.00 bpm. (Perfs are at 9655-57'). POOH chasing cement to surface. Repaired injector head bearing at 6478'. PU Cmt drilling BHA. RIH with BHA #6 (3.73" mill and motor). Correct depth -45' at 8800'. Tag cement at 9660'. Compressive strength at 1500 psi. Pressure test to 2000 psi and lost 100 psi in 5 min. Drill a few Iow side (hole angle 46 deg) cement stringers from 9660-9932'. RIH to 10000'. Pressure test to 2000 psi and lost 200 psi in 6 minutes with steady bleed off. Discuss. RIH to 12000' and hole was clean (left FIo Pro undisturbed over perf interval). POOH for perf guns. LD drilling assy. Load perf guns in pipe shed. E-04A, Coil Tubing Drilling Page 2 01/30/99 5 Held Perforating Safety and Operational Meeting. PU Perf System. RIH. Tagged at 12700'. Corrected back to 12650'. Corrected back 50'. PUH and set bottom shot at 12640'. Dropped 5/8" ball. Circulated to firing head. Sheared FH at 3650 psi. Cir at 1.0/0.9 BPM. POOH with Perf guns. CCH. Kill line plugged. Remove ice plug. Held Safety & Operational Meeting. Layed down Perf Guns. RIH and Freeze Protected top 2000' of 4 ~,,~" Tubing. SI swab. Suspend RD operations due to weather. Begin Standby at 1930 hrs 1/29/99 while WOW (amb temp avg -45°, WC avg -95°). Perforated: 12402' to 12640' 4 spf with 2-7/8" guns 01/31/99 6 Wait on Weather -47°F (WC at -90°F). 02/01/99 7 Wait on weather to RD (Amb -43°F, WC -85°F). 02/02/99 8 WOW to RD. Temp warmed up to -39F. Blow down CT with N2. Pull CT to reel and secure. Remove CT straightner from injector. Fabricate supports and install gooseneck back to prior configuration. Replace packoffs. 02/03/99 9 Nipple Down BOPE. Move DS/N #1 off well. Install and test tree cap. Rig Released at 0900 hfs 2-2-99. Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_ WOA E Pad, Slot E-O4A E-O4A Job No. AKMM90042, Surveyed: 20 December, 1998 Bp~PDO SURVEY REPORT ORIGINAL 11 January, 1999 Your Ref: AP1-500292018401 KBE-56.95 MWD SURVEY INSTRUMENT Surface Coordinates: 5975910.00 N, 664468.00 E (70° 20' 25.7530" N, 148° 39' 54.9748" W) Survey Ref: evy4520 Sperry-Sun Drilling Services Survey Report for E-O4A Your Ref: API-500292018401 Job No. AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 8300.43 30.880 303.610 7624.60 8347.00 31.020 304.370 7664.54 8393.07 33.400 301.820 7703.52 8421.45 36.830 300.190 7726.73 8450.45 41.150 298.660 7749.27 8481.43 45.750 297.150 7771.75 8513.74 46,830 295.510 7794.08 8544.91 46.620 294.330 7815.45 8606.20 46.090 292.110 7857.75 8700.59 45.250 295.500 7923.72 8794.48 46.870 297,040 7988.87 8885.93 45.280 298.000 8052.31 8982.92 43.580 301.700 8121.58 9072.23 45.280 303.950 8185.36 9165.38 44.740 301,250 8251.22 9258.57 46.650 298.800 8316.31 9352.76 46.010 301.650 8381.36 9448.06 47.700 298.480 8446.53 9539.12 47,170 296,740 8508.13 9632.24 46.170 300.390 8572.04 9696.50 47.060 299.800 8616.18 9790.25 51.310 299.020 8677.44 9821.68 51.200 299,850 8697.11 9853.41 51.450 300.770 8716.94 9884.49 51.800 300.990 8736.24 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (fi) 7681.55 900.75 N 2183.59W 5976762.63 N 662265.18 E 7721.49 914.14 N 2203.45W 5976775.58 N 662245.03 E 7760.47 927.53 N 2224.02W 5976788.52 N 662224.16 E 7783.68 935.93 N 2238.02W 5976796,61 N 662209.99 E 7806.22 944.88 N 2253.91W 5976805.21N 662193.90 E 7828.70 954.84 N 2272.74W 5976814.75 N 662174.86 E 7851.03 965.19 N 2293.67W 5976824.65 N 662153.71E 7872.40 974.75 N 2314.25W 5976833.75 N 662132.92 E 7914.70 992.24 N 2355.00W 5976850.34 N 662091.80 E 7980.67 1019.47 N 2416.77W 5976876.21 N 662029.45 E 8045.82 1049.40 N 2477,38W 5976904.81 N 661968.20 E 8109.26 1079.83 N 2535.79W 5976933.95 N 661909.13 E 8178.53 1113.58 N 2594.68W 5976966.40 N 661849.52 E 8242.31 1147.48 N 2647.20W 5976999.14 N 661796.27 E 8308.17 1182.98 N 2702.68W 5977033.41 N 661740.02 E 8373.26 1216.32 N 2760.42W 5977065.47 N 661681.56 E 8438.31 1250.60 N 2819.28W 5977098.46 N 661621.96 E 8503.48 1285.40 N 2879.46W 5977131.93 N 661561.04 E 8565.08 1316.49 N 2938.88W 5977161.70 N 661500.95 E 8628.99 1348.85 N 2998.36W 5977192.75 N 661440.77 E 8673.13 1372.27 N 3038.76W 5977215.28 N 661399.86 E 8734.39 1407.08 N 3100.57W 5977248.73 N 661337.31 E 8754.06 1419.13 N 3121.91W 5977260.31 N 661315.71 E 8773.89 1431.63 N 3143.30W 5977272.34 N 661294.05 E 8793.19 1444.14 N 3164.21W 5977284.38 N 661272.87 E Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Rate (°ll00ff) Vertical Section (ft) Comment 0.892 5.948 12.528 15,261 15.221 4.963 2.837 2.76O 2,719 2.o91 1.896 3,194 2.595 2.13o 2.782 2.292 3.005 1.523 3.046 1.537 4.577 2.o89 2.397 1.255 280.36 287.91 295.28 299.60 303.95 3o8.48 312.82 316.50 322.38 332.oo 344.53 358.13 374.80 393.33 412.59 429.18 446.37 463.71 477.67 492.84 504.53 521.45 527.31 533.60 540.02 Tie-on Survey Window Point Continued... 11 January, 1999 - 9:41 .2 - DrillQuest Sperry-Sun Drilling Services Survey Report for E:O4A Your Ref: AP1-500292018401 Job No. AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (it) 9916.19 51.510 304.760 8755.91 9949.47 51.210 311.290 8776.70 9978.06 51.770 315.300 8794.51 10010.51 52.340 319.130 8814.47 10040.81 52.970 322.470 8832.85 10072.58 54.580 325.690 8851.63 10106.20 56.250 329.060 8870.71 10137.88 57.700 332.970 8887.98 10165.58 59.730 336.980 8902.37 10198.66. 62.540 340.020 8918.34 10229.86 64.920 344.520 8932.16 10256.56 67.500 347.540 8942.93 10288.17 69.850 351.670 8954.43 10320.27 73.300 355.040 8964.57 10349.86 76.120 357.510 8972.38 10381.55 79.920 0.110 8978.96 10412.24 84.240 2.850 8983.18 10442.54 89.880 3.150 8984.74 10473.87 91.510 5.460 8984.36 10504.01 90.620 7.790 8983.80 10535.15 91,.080 9.630 8983.33 10566.75 91.390 12.880 8982.65 10598.37 91.330 14.830 8981.90 10629.51 90.000 19.170 8981.54 10660.06 90.280 23.200 8981.47 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 8812.86 1457.63 N 3185.09 W 5977297.41 N 661251.71 E 8833.65 1473.62 N 3205.54 W 5977312.95 N 661230.90 E 8851.46 1488.96 N 3221.82 W 5977327.93 N 661214.29 E 8871.42 1507.74 N 3239.19 W 5977346.32 N 661196.51 E 8889.80 1526.40 N 3254.41 W 5977364.65 N 661180.89 E 8908.58 1547.16 N 3269.44 W 5977385.07 N 661165.41 E 8927.66 1570.47 N 3284.35 W 5977408.04 N 661149.99 E 8944.93 1593.70 N 3297.21 W 5977430.98 N 661136.62 E 8959.32 1615.14 N 3307.21 W 5977452.21 N 661126.15 E 8975.29 1642.09 N 3317.82 W 5977478.92 N 661114.96 E 8989.11 1668173 N 3326.32 W 5977505.37 N 661105.87 E 8999.88 1692.44 N 3332.21 W 5977528.94 N 661099.46 E 9011.38 1721.39 N 3337.52 W 5977557.77 N 661093.53 E 9021.52 1751.63 N 3341.03 W 5977587.92 N 661089.35 E 9029.33 1780.11 N 3342.88 W 5977616.35 N 661086.88 E 9035.91 1811.10 N 3343.52 W 5977647.32 N 661085.56 E 9040.13 1841.47 N 3342.73 W 5977677.70 N 661085.68 E 9041.69 1871.68 N 3341.15 W 5977707.94 N 661086.60 E 9041.31 1902.91 N 3338.80 W 5977739.22 N 661088.27 E 9040.75 1932.85 N 3335.32 W 5977769.22 N 661091.08 E 9040.28 1963.62 N 3330.60 W 5977800.09 N 661095.12 E 9039.60 1994.60 N 3324.44 W 5977831.20 N 661100.61 E 9038.85 2025.29 N 3316.87 W 5977862.05 N 661107.50 E 9038.49 2055.06 N 3307.77 W 5977892.01 N 661115.95 E 9038.42 2083.54 N 3296.73 W 5977920.72 N 661126.36 E Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Vertical Rate Section (°ll00ff) (fi) Comment 9.371 547.40 15.349 557.30 11.148 567.70 9.471 581.11 9.006 595,00 9.618 610.95 9.631 629.39 11.314 648.30 14.377 666.27 11.700 689.38 15.013 712.75 14.158 734.00 14.261 760.46 14.652 788.64 12.476 815.57 14.428 845.24 16.622 874.71 18.640 904.23 9.023 934.95 8.274 964.71 6.090 995.62 10.329 1027.12 6.168 1058,71 14.576 1089.83 13.223 1120.23 Continued... 11 January, 1999 - 9:41 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for E-O4A Your Ref: API-500292018401 Job No. AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. 10691.05 89,630 10723.86 89,230 10753.06 89,390 10787.31 9o.310 10815.60 91.5o0 10846.17 92.000 10872.27 91,990 10909,61 91.45o 10941.09 89.320 10972.11 . 86.580 11004.09 84.730 11035.20 84.360 11066.05 86,240 11096.59 88.12o 11128.85 90.800 11159.54 92.000 11190.38 92.060 11223.20 91.230 11254.14 89.480 11284.96 88.61o 11314.62 88,710 11347.63 88.400 11376.86 88.15o 11407.32 88.890 11439.86 90.280 Azim. 27.440 29.240 33.150 32,920 32.820 36.810 37.840 44.250 45.71o 48.970 52.200 54.51o 57.550 60.060 62.060 61.53o 62.330 61.370 61.160 60.620 60.590 62.020 62.81o 63.960 64.650 Sub-Sea Depth (ft) 8981.49 8981.82 8982.17 8982.26 8981.81 8980.88 8979.97 8978.85 8978.64 8979.75 8982.17 8985.13 8987.66 8989.16 8989.46 8988.71 8987.62 8986.68 8986.49 8987.00 8987.69 8988.53 8989.41 8990.19 8990.43 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 9038.44 2111.55 N 3283.48W 5977949,01 N 661138.99 E 9038.77 2140.42 N 3267.91W 5977978,22 N 661153.93 E 9039.12 2165.39 N 3252.79W 5978003.52 N 661168.50 E 9039.21 2194.11 N 3234.11W 5978032.63 N 661186.53 E 9038.76 2217.86 N 3218.76W 5978056,72 N 661201.36 E 9037.83 2242.95 N 3201.32W 5978082.18 N 661218.25 E 9036.92 2263.69 N 3185.51W 5978103,27 N 661233.60 E 9035.80 2291.82 N 3161.01W 5978131,93 N 661257.48 E 9035.59 2314.09 N 3138.76W 5978154.68 N 661279.23 E 9036.70 2335.09 N 3115.97W 5978176.18 N 661301.56 E 9039.12 2355.33 N 3091.34W 5978196.95 N 661325.74 E 9042.08' 2373.82 N 3066.49W 5978215.98 N 661350.17 E 9044.61 2390.99 N 3041.00W 5978233.71 N 661375.29 E 9046.11 2406.79 N 3014.91W 5978250.07 N 661401.02 E 9046.41 2422.40 N 2986.68W 5978266.30 N 661428.90 E 9045.66 2436.90 N 2959.64W 5978281.39 N 661455.61 E 9044.57 2451.40 N 2932.45W 5978296.48 N 661482.48 E 9043.63 2466.88 N 2903.52W 5978312.59 N 661511.06 E 9043.44 2481.75 N 2876.39W 5978328.06 N 661537.86 E 9043.95 2496.74 N 2849.47W 5978343.63 N 661564.44 E 9044.64 2511.30 N 2823.64W 5978358.75 N 661589.95 E 9045.48 2527.14 N 2794.69W 5978375.23 N 661618.55 E 9046.36 2540.67 N 2768.80W 5978389.32 N 661644.14 E 9047.14 2554.31 N 2741.57W 5978403.56 N 661671.05 E 9047.38 2568.42 N 2712.25W 5978418.30 N 661700.06 E Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Vertical Rate Section (°ll00ff) (ft) Comment 13.842 1150.77 5.620 1182.77 13,401 1210.89 2.769 1243.56 4.221 1270.58 13.148 1299.42 3.944 1323.65 17.220 1357.34 8.203 1384.77 13.722 1411.13 11.614 1437.25 7.487 1461.73 11.558 1485.13 10.260 1507.36 10.365 1529.98 4.274 1551.22 2.600 1572.50 3,866 1595.19 5.697 1616.81 3.322 1638.49 0.352 1659.45 4.431 1682.50 2.834 1702.49 4.488 1722.95 4.769 1744.43 Continued... 11 January, 1999 - 9:41 .4 - DrlllQuest Sperry-Sun Drilling Services Survey Report for E-O4A Your Ref: API-500292018401 Job No. AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. 11470.85 92.440 11501.25 92.900 11535.70 93.390 11563.38 94.340 11594.30 91.660 11625.34 89.690 11657.20 88.860 11688.40 87.140 11719.25 85.930 11750.97 ' 86.120 11782.11 86.980 11813.43 88.210 11843.46 90.890 11875.11 92.620 11906.74 93.360 11937.54 93.320 11968.40 93.040 12000.49 91.480 12031.57 91.750 12062.19 91.480 12091.65 90;250 12124.13 90.580 12155.03 90.920 12184.97 92.180 12218.63 91.140 Azim. 64.690 64.640 64.800 64.590 64.170 62.990 63.820 63.420 64.300 63.870 63.890 64.150 64.640 64.510 66.300 65.730 65.230 64.780 65.230 64.590 64.310 63.900 64.410 63.630 63.840 Sub-Sea Depth (ft) 8989.69 8988.28 8986.39 8984.52 8982.90 8982.54 8982.94 8984.03 8985.89 8988.09 8989.97 8991.28 8991.52 8990.55 8988.90 8987.10 8985.39 8984.13 8983.25 8982.39 8981.94 8981.71 8981.30 8980.49 8979.52 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 9046.64 2581.67 N 2684.25W 5978432.17 N 661727.76 E 9045.23 2594.67 N 2656.81W 5978445.76 N 661754.92 E 9043.34 2609.36 N 2625.70W 5978461.13 N 661785.69 E 9041.47 2621.16 N 2600.74W 5978473.48 N 661810.39 E 9039.85 2634.51 N 2572.90W 5978487.44 N 661837.93 E 9039.49 2648.32 N 2545.10W 5978501.85 N 661865.42 E 9039.89 2662.58 N 2516.62W 5978516.74 N 661893.58 E 9040.98 2676.44 N 2488.68W 5978531.20 N 661921.21E 9042.84 2690.00 N 2461.04W 5978545.37 N 661948.54 E 9045.04 2703.83 N 2432.58W 5978559.82 N 661976.70 E 9046.92 2717.52 N 2404.67W 5978574.11 N 662004.30 E 9048.23 2731.22 N 2376.54W 5978588.43 N 662032.12 E 9048.47 2744.20 N 2349.46W 5978602.00 N 662058.91 E 9047.50 2757.78 N 2320.89W 5978616.21 N 662087.17 E 9045.85 2770.93 N 2292.17W 5978629.98 N 662115.60 E 9044.05 2783.43 N 2264.08W 5978643.09 N 662143.41 E 9042.34 2796.21 N 2236.05W 5978656.49 N 662171.15 E 9041.08 2809.76 N 2206.98W 5978670.67 N 662199.91 E 9040.20 2822.89 N 2178.83W 5978684.41 N 662227.77 E 9039.34 2835.87 N 2151.11W 5978698.00 N 662255.20 E 9038.89 2848.57 N 2124.53W 5978711.28 N 662281.49 E 9038.66 2862.76 N 2095.31W 5978726.10 N 662310.39 E 9038.25 2876.23 N 2067.51W 5978740.18 N 662337.90 E 9037.44 2889.34 N 2040.60W 5978753.88 N 662364.51 E 9036.47 2904.22 N 2010.43W 5978769.42 N 662394.34 E Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Vertical Rate SeCtion (°/100ft) (fi) Comment 6.971 1764.72 1.522 1784.62 1.496 1807.13 3.515 1825.21 8.773 1845.56 7.398 1866.33 3.684 1887.73 5.660 1908.59 4.847 1929.09 1.479 1950.06 2.762 1970.75 4.014 1991.51 9.072 2011.29 5.481 2032.06 6.117 2052.44 1.852 2072.04 1.855 2091.89 5.059 2112.76 1.688 2132.97 2.268 2152.93 4.282 2172.31 1.620 2193.83 1.984 2214.28 4.949 2234.14 3.152 2256.60 Continued... 11 January, 1999- 9:41 - 5- DrillQuest Sperry-Sun Drilling Services Survey Report for E-O4A Your Ref: API-500292018401 Job No, AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 12250.19 90.220 64.350 8979.14 9036.09 2918.01 N 1982.04 W 5978783.83 N 662422.42 E 12281.39 90.920 64.130 8978.83 9035.78 2931.57 N 1953.95 W 5978798.00 N 662450.22 E 12313.40 90.490 64.270 8978.44 9035.39 2945.50 N 1925.13 W 5978812.56 N 662478.72 E 12343.25 89.170 64.530 8978.53 9035.48 2958.40 N 1898.21 W 5978826.05 N 662505.35 E 12373.68 88.770 64.800 8979.07 9036.02 2971.42 N 1870.71 W 5978839.67 N 662532.56 E 12405.22 87.540 65.400 8980.09 9037.04 2984.69 N 1842.12 W 5978853.56 N 662560.85 E 12448.36 87.480 65.510 8981.96 9038.91 3002.59 N 1802.92 W 5978872.32 N 662599.65 E 12498.54 88.190 65.450 8983.86 9040.81 3023.40 N 1757.29 W 5978894.13 N 662644.81 E 12527.61 88.680 65.000 8984.65 9041.60 3035.58 N 1730.91 W 5978906.88 N 662670.92 E 12558.85 ' 88.710 65.120 8985.36 9042.31 3048.75 N 1702.59W 5978920.67 N 662698.94 E 12589.93 90.000 64.980 8985.71 9042.66 3061.86 N 1674.41 W 5978934.39 N 662726.83 E 12621.19 88.680 64.780 8986.07 9043.02 3075.13 N 1646.11 W 5978948.28 N 662754.83 E 12657.18 89.050 64.670 8986.79 9043.74 3090.49 N 1613.57 W 5978964.35 N 662787.02 E 12714.00 89.050 64.670 8987.73 9044.68 3114.80 N 1562.22 W 5978989.78 N 662837.83 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.851° (20-Dec-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 15.600° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12714.00ft., The Bottom Hole Displacement is 3484.61ft., in the Direction of 333.364° (True). Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Rate (°/100fi) Vertical Section (ft) Comment 3.333 2.352 1.413 4.507 1.586 4.339 0.290 1.420 2.288 0.396 4.175 4.271 1.073 0.000 2277.51 2298.12 2319.29 2338.95 2358.89 2379.36 2407.15 2439.46 2458.28 2478.58 2498.79 2519.18 2542.72 2579.94 Projeted Survey Continued... 11 January, 1999 - 9:41 - 6 - DrillQuest Sperry-Sun Drilling Services Survey Report for E-O4A Your Ref: API-500292018401 Job No. AKMM90042, Surveyed: 20 December, 1998 Prudhoe Bay Unit Comments Measured Depth (ft) 8300.43 8347.00 12714.00 Station Coordinates TVD Northings Eastings Comment (ft) (ft) (tt) 7681.55 900.75 N 2183.59 W Tie-on Survey 7721.49 914.14 N 2203.45 W Window Point 9044.68 3114.80 N 1562.22 W ProJeted Survey Alaska' State Plane Zone 4 PBU_WOA E Pad 11 January, 1999 - 9:42 - 7 - DrlllQuest 1 ~20~99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 Al'TN: Sherrie NO. 12251 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Color Well Job if Log Description Date Print Blueline Sepia LIS Tape X-03A 99021 USIT 980617 1 E-e4A CBT 990112 1 1 H-31 C~I (---, CBL 990110 1 1 Z-38 ~ "~c-1 ~ ~ 98607 MCNL BORAX 981015 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Bivd. Anchorage, Alaska 99519-6612 NE(,,EtVED Date Delivered: 21 Gao Con~,. Commission Ala,~ka Oil & ' Schlumberger GeoQuest 3940 Arctic Blvd R e c e iv e~._~: ,~' ;~.,-~~ MEMORANDUM TO: David Johnston, State of Alaska Alaska Oil and Gas Conservation Commission DATE: December 17, 1998 THRU: Blair Wondzell, P. I. Supervisor FROM: Chuck Scheve, ~ -~ SUBJECT: Petroleum Inspector FILE NO: af9klqfe.doc BOPE Test Nabors 7ES PBU E-04A PTD # 98-181 Thursday, December 17, 199,8: i traveled to BPXs E-04A well and witnessed the initial BOPE test on rig 7ES. As the attached AOGCC BOPE Test Report shows the test lasted 3 hours and there were no failures. The lower pipe rams were not tested at this time due to the length of the crossovers to the tuging hanger. These rams were tested by toolpusher Bob Mize when the tubing was laid down. The testing went'very well considering this is a new rig with new crews. The rig was clean and all equipment appeared to be properly rigged up. The location was clean and all extra equipment was properly stored. Summary: I witnessed the inital BOPE test on Nabors Rig 7ES drilling BPXs E- 04A well. NABORS 7ES, 12/17/98, Test Time 3 Hours, no Failures Attachment: aimklqfe.xis X Unclassified Confidential (Unclassified if doc. removed ) STATE OF ALAS ' OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: NABORS Rig No. Operator: SSD Well Name: E-O4A Casing Size: Set @ Test: Initial X Weekly Other 7ES PTD # Rep.: Rig Rep.: Location: Sec. g8-181 DATE: 12/17/98 Rig Ph.# 659-4831 Richard Bordes Bob Mize / Mike Downey I T. 11N R. 12E Meridian Urn. VIISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. YES FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 500t5000 P 500~5000 500/5,000 500/5,000 P P P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F P 250/3500 250/50O0 250/5000 250/5000 250/5000 250/5000 N/A P P P 2 P I P MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK FI°w Indicator OK OK Meth Gas Detector OK OK H2S Gas Detector OK OK CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 14 250/5,000 P 32 250/5,000 P P Func§oned Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 4 ~,2200 3,000 ! P 1,800 'P 0 minutes 20 sec. minutes 50 sec. YES Remote: YES Psig. Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: #ax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: good test Distribution: odg-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector FI-021L (Rev. 12/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: afgkiqfe Chuck Scheve ~1~¢_.~ ~hared" ...... ., ,~~e~ices ~ k'~",,, ~rilling BP Exploration / ARCO Alaska Inc. To: From: Subject: Reference: Blair Wondzell - AOGCC C. Michael Jackson E-04A Resume Sidetrack Operations Form 10-403 Attachment Permit to Drill #98-181, APl #50-029-20184-01 Date: December 10, 1998 Nabors 7ES is expected to move on E-04A this Saturday, December 12th, following the suspension of S-11Al. This memo is written as an attachment to form 10-403 for the re-start of sidetrack operations on E-04A(API #50-029-20184-01). Operations are expected to follow previously approved Permit to Drill #98-181. Should you need any more information or have any questions please feel free to give me a call. Sincerely, Operations Drilling Engineer 564-5486 Wk 275-1544 Pgr 349-1383 H m cc Kriss Wegemer Dan Stone STATE OF ALASKA ALASK~-,~_~IL AND GAS CONSERVATION COr,~rMISSlON APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM At top of productive interval 833' NSL, 3795' WEL, SEC. 31, T12N, R14E,UM At effective depth At total depth 1921' NSL, 2092' WEL, SEC. 31, T12N, R14E, UM (Planned) (Planned) 12. Present well condition summary 5. Type of well: [~ Development I--I Exploratory I--I Stratigraphic I--I Service t3PlP, lkl^ 6. Datum Elevation (DF or KB) Plan KBE = 66.47' Total depth: measured true vertical Effective depth: measured true vertical 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number E-04A 9. Permit Number 98-181 10. APl Number 50- 029-20184-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 10195 feet Plugs (measured) Bridge Plug at 9378'; Cement Plug at 9593' (01/98) 9295 feet 9593 feet Junk (measured) 270' Coil Tubing Equip. Fish, Top at 9300' (02/98) 7920 feet Casing Length Structural Conductor 104' Surface 2812' Intermediate 9103' Production Liner 1514' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) Size Cemented MD TVD 20" 13-3/8" 4388 sx Permafrost 10-3/4" x 9-5/8" 1470 sx Howco Lite & Class 'G' 132' 132' 2840' 2840' 9131' 8388' 7" 593 sx Class 'G' ~-~1' - 10195' 7981' - 9295' 4-1/2", 12.6ff, L-80 Kill String to 2054'; 5-1/2", 17ff, L-80 from 8398' - 8565'; 3-1/2", 9.3~, L-80 from 8565' - 9817' Packers and SSSV (type and measured depth) 9-5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9809' 13. Attachments [~ Description summary of proposal [~ Detailed operations program I-q BOP sketch 14. Estimated date for commencing operation December 12, 1998 16. If proposal was verbally approved Name of approver Date approved Contact Engineer Name/Number: C. Michael Jackson, 564-5480 15. Status of well classifications as: [~ Oil [~ Gas E] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~--------'~..., -,,'-,o~-~;::::::- Dan Stone Title Engineering Supervisor Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date I Approval No.~,~¢~--,,~ Plug integrity .,,'/ BOP Test ~ Location clearance__ Mechanical Integrity Test,~:na.! Signed.,~;)sequent form required 10-'Lf~OM'r Approved by order of the Commission ~)8,ViQ W. Johnston Commissioner Form 10-403 Rev. 06/15/88 Submit In Triplicate hared , ? ervices S'k, a rilling BP Exploration / ARCO Alaska Inc. To: Blair Wondzell - AOGCC From: C. Michael Jackson Subject: Reference: E-04A Resume Sidetrack Operations Form 10-403 Attachment Permit to Drill #98-181, APl #50-029-20184-01 Date: December 10, 1998 Nabors 7ES is expected to move on E-04A this Saturday, December 12th, following the suspension of S-11Ai. This memo is written as an attachment to form 10-403 for the re-start of sidetrack operations on E-04A(API #50-029-20184-01). Operations are expected to follow previously approved Permit to Drill #98-181. Should you need any more information or have any questions please feel free to give me a call. Sincerely, Operations Drilling Engineer 564-5486 Wk 275-1544 Pgr 349-1383 Hm cc Kriss Wegemer Dan Stone STATE OF ALASKA ALASKA O~_'AND GAS CONSERVATION COM,--~SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [~ Pull Tubing I~Alter Casing E~ Repair Well [~]Other 2. Name of Operator 15. Type of well: 6. BP Exploration (Alaska)Inc. I [] Development I--I Exploratory 7. 3. Address I--I Stratigraphic P.O. Box 196612, Anchorage, Alaska 99519-6612 I~ Service 4. Location of well at surface 8. Operation Shutdown []Stimulate [] Plugging [] Perforate Datum Elevation (DF or KB) Plan KBE = 66.47' Unit or Property Name Prudhoe Bay Unit Well Number 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM At top of productive interval 833' NSL, 3795' WEL, SEC. 31, T12N, R14E,UM At effective depth At total depth 1921' NSL, 2092' WEL, SEC. 31, T12N, R14E, UM (Planned) (Planned) E-04A 9. Permit Number / Approval No. 98-181 398-282 10. APl Number 50-029-20184-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10195 feet true vertical 9295 feet Effective depth: measured 9593 feet true vertical 7920 feet Casing Length Structural Conductor 104' Surface 2812' Intermediate 9103' Production Liner 1514' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size Plugs (measured) Junk (measured) Bridge Plug at 9378'; Cement Plug at 9593' (01/98) 270' Coil Tubing Equip. Fish, Top at 9300' (02/98) Cemented MD TVD 20" 13-3/8" 4388 sx Permafrost 10-3/4" x 9-5/8" 1470 SX Howco Lite & Class 'G' 132' 132' 2840' 2840' 9131' 8388' 7" 593 sx Class 'G' EC¢ VED. t.; L_(] 4-1/2", 12.6¢, L-80 Kill String to~j~-l/2'', 17¢, L-80 from 8398' - 8565'; 3-1/2", 9.3ff, L-80 from 8565' - 9817' 9-5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9809' 8651' - 10195' 7981' - 9295' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 5. Attachments I16. Status of well classifications as: I--I Copies of Logs and Surveys run I [] Oil [] Gas [] Suspended [] Daily Report of Well Operations I hereby c/~rtify that the fore/~ing is true and correct to the best of my knowledge Signed Title Senior Drilling Engineer Prepared By Name/Number: Service Date /fO~./~/? ~'~ Terrie Hubble, 564-4628 Submit In Duplicat~ Form 10-404 Rev. 06/15/88 Progress Report Facility PB E Pad Well E-04A Page 1 Rig ~ 1)O~ ! I.] Date 02 December 98 Date/Time 20 Oct 98 09:00-09:15 09:15-10:00 10:00-12:30 12:30-17:00 17:00-17:30 17:30-18:00 18:00-18:15 18:15-18:30 18:30-20:00 20:00-21:00 21:00-22:00 22:00-23:30 23:30-03:00 21 Oct 98 03:00-03:30 03:30-06:00 06:00-08:30 08:30-09:00 09:00-11:30 11:30-12:30 12:30-13:30 13:30-16:30 16:30-03:00 22 Oct 98 03:00-05:00 05:00-06:00 06:00-08:00 08:00-11:45 11:45-12:45 12:45-13:00 13:00-14:15 14:15-15:00 15:00-17:30 17:30-22:45 22:45-23:00 23:00-01:00 23 Oct 98 01:00-02:00 02:00-02:30 02:30-02:45 02:45-06:00 06:00-06:45 06:45-07:15 07:15-08:00 08:00-11:45 11:45-12:00 12:00-13:00 13:00-15:00 15:00-16:00 16:00-16:30 16:30-20:30 20:30-21:30 21:30-22:30 22:30-00:00 24 Oct 98 00:00-02:00 02:00-04:00 04:00-04:30 Duration 1/4 hr 3/4 hr 2-1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 1/4 hr 1/4hr 1-1/2 hr lhr lhr 1-1/2 hr 3-1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr lhr lhr 3hr 10-1/2 hr 2hr lhr 2hr 3-3/4 hr lhr 1/4 hr 1-1/4 hr 3/4 hr 2-1/2 hr 5-1/4 hr 1/4hr 2hr lhr 1/2 hr 1/4 hr 3-1/4 hr 3/4 hr 1/2hr 3/4 hr 3-3/4 hr 1/4 hr lhr 2hr lhr 1/2 hr 4hr lhr lhr 1-1/2 hr 2hr 2hr 1/2 hr Activity Held safety meeting Rigged down Drillfloor / Derrick Installed Rig services Rig moved 100.00 % Rigged down Swab cap Removed Hanger plug Held safety meeting Rigged up Lubricator Installed Hanger plug Installed BOP stack Installed Hanger plug Rigged down Xmas tree Rigged up BOP stack Rigged up High pressure lines Tested BOP stack Tested BOP stack (cont...) Rigged down High pressure lines Removed Hanger plug Rigged up Bell nipple Freeze protect well - 150.000 bbl of Diesel Made up BHA no. 1 Singled in drill pipe to 9288.0 ft Circulated at 9288.0 ft Fished at 9288.0 ft Fished at 9288.0 ft (cont...) Pulled out of hole to 0.0 ft Held safety meeting Laid down fish Laid down 824.0 ft of 2-1/16in OD drill pipe Rigged down Tubing handling equipment R.I.H. to 8121.0 ft Laid down 8121.0 ft of 2-7/8in OD drill pipe Held safety meeting Laid down 450.0 ft of 2-7/8in OD drill pipe Rigged down Drillstring handling equipment Tested Casing head Held safety meeting Conducted electric cable operations Conducted electric cable operations (cont...) Fished at 35.0 ft Rigged down Tubing hanger Circulated at 8414.0 ft Removed Sub sea tools Rigged up Logging/braided cable equipment Conducted electric cable operations Fished at 8525.0 ft Held safety meeting Conducted electric cable operations Installed Slickline unit Installed Slickline unit Conducted slickline operations on Slickline equipment - Tool run Rigged up Rigging equipment Rigged up Logging/braided cable equipment Rigged up Rigging equipment Progress Report Facility PB E Pad Well E-04A Page 2 Rig (null) Date 02 December 98 Date/Time 25 Oct 98 26 Oct 98 04:30-05:00 05:00-06:00 06:00-07:00 07:00-08:30 08:30-13:00 13:00-18:00 18:00-18:15 18:15-19:30 19:30-19:45 19:45-21:00 21:00-21:15 21:15-22:00 22:00-22:15 22:15-22:30 22:30-23:00 23:00-23:30 23:30-23:45 23:45-02:30 02:30-03:00 03:00-03:15 03:15-06:00 06:00-06:45 06:45-07:15 07:15-08:30 08:30-09:15 09:15-09:30 09:30-10:00 10:00-10:30 10:30-19:00 19:00-19:30 19:30-22:00 22:00-00:00 00:00-04:00 04:00-04:30 04:30-05:00 05:00-06:00 06:00-09:00 09:00-09:15 09:15-09:30 09:30-09:45 09:45-10:30 10:30-10:45 10:45-12:30 12:30-14:30 14:30-14:45 14:45-15:00 15:00-16:00 16:00-16:15 16:15-16:30 16:30-20:30 20:30-20:45 20:45-21:30 21:30-21:45 21:45-01:00 Duration 1/2 hr lhr lhr 1-1/2 hr 4-1/2 hr 5hr 1/4 hr 1-1/4 hr 1/4 hr 1-1/4 hr 1/4 hr 3/4 hr 1/4 hr 1/4 hr 1/2hr 1/2 hr 1/4 hr 2-3/4 hr 1/2 hr 1/4 hr 2-3/4 hr 3/4 hr 1/2 hr 1-1/4 hr 3/4 hr 1/4 hr 1/2 hr 1/2 hr 8-1/2 hr 1/2 hr 2-1/2 hr 2hr 4hr 1/2 hr 1/2 hr lhr 3hr 1/4 hr 1/4 hr 1/4 hr 3/4 hr 1/4hr 1-3/4 hr 2hr 1/4 hr 1/4 hr lhr 1/4 hr 1/4 hr 4hr 1/4 hr 3/4 hr 1/4 hr 3-1/4 hr Activity Held safety meeting Conducted electric cable operations Conducted electric cable operations (cont...) Conducted electric cable operations Fished at 33.0 ft Fished at 33.0 ft Held safety meeting Removed BOP stack Held safety meeting Removed Hanger plug Held safety meeting Rigged up BOP stack Held safety meeting Fished at 100.0 ft Conducted electric cable operations Tested BOP stack Held safety meeting Conducted electric cable operations Rigged down sub-surface equipment - Other sub-surface equipment Held safety meeting Laid down Tubing of 8398.0 ft Laid down 8398.0 ft of Tubing (cont...) Rigged down Completion string handling equipment Installed Emergency hang off assembly Installed Hanger plug Tested Blind ram Retrieved Hanger plug Retrieved Emergency hang off assembly Laid down 1125.0 ft of 5in OD drill pipe Held safety meeting Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Tested Well control Held safety meeting Ran Tubing to 4-1/2in (2054.0 ft OD) Ran Tubing to 2054.0 ft (4-1/2in OD) (cont...) Installed Hanger plug Tested Hanger plug Held safety meeting Serviced Pipe ram Held safety meeting Removed BOP stack Installed Xmas tree Tested Xmas tree Retrieved Hanger plug Freeze protect well - 145.000 bbl of Diesel Installed Hanger plug Functioned %s Rigged down Drillfloor / Derrick Held safety meeting Skid rig Held safety meeting Rig moved 100.00 % Facility PB E Pad Progress Report Well E-04A Rig (null) Page Date 3 02 December 98 Date/Time 27 Oct 98 28 Oct 98 29 Oct 98 30 Oct 98 01:00-01:30 01:30-06:00 06:00-06:00 06:00-21:00 21:00-06:00 06:00-07:00 07:00-01:00 01:00-06:00 06:00-00:00 Duration 1/2 hr 4-1/2 hr 24 hr 15hr 9hr lhr 18hr 5hr 18hr Activity Skid rig Rigged down Fluid system Rigged down Fluid system (cont...) Rigged down Fluid system (cont...) Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick (cont...) Rig moved 100.00 % Rigged up Rig services Rigged down Drillfloor / Derrick TONY KNOWLES, GOVERNOR ALAS~ OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 10, 1998 Dan Stone Engineering Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit E-04A BP Exploration (Alaska) Inc. Permit No: 98-181 Sur Loc: 4125'NSL, 502'WEL, See. 06, T11N, R14E, UM Btmhole Loc. 1921'NSL, 2092'WEL, Sec. 31, T12N, R14E, UM Dear Mr. Stone: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill docs not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. Johnston~''~'~ Chairman ~ BY ORDER OF THE COMMISSION dlffEnclosures CC2 Department of Fish & Game, Habitat Section w/o enck Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA U~,-AND GAS CONSERVATION COMmiSSION PERMIT TO DRILL 20 AAC 25.005 RECFIV D ~.,,:o 02 1998 OL~ - la. Type ofwork I--IDrill [~Redrill Ilb. Type ofwell I--IExploratory I--Ist~l~l~ic'. [] Re-Entry [] DeepenI []Service [] Development Gas [] S~ngle Zone ulbple Zone "~. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 66.47' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 j ADL 028299 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 833' NSL, 3795' WEL, SEC. 31, T12N, R14E,UM E-04A Attotal depth 9. Approximate spud date Amount $200,000.00 1921' NSL, 2092' WEL, SEC. 31, T12N, R14E, UM 09/13/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028304, 1921'I No Close Approach 2560 12737' MD /8987' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 8350 Maximum Hole Angle 93° Maximum surface 2487 psig, At total depth ('rVD) 8360' / psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTC-Mod 1510' 8150' 7540' 9660' 8653' 316 sx Class 'G' 6" 4-1/2" 12.6# L-80 BTC-Mod 8370' 9510' 8550' 12737' 9045' :375 sx Class 'G' !19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 10195 feet Plugs (measured) true vertical 9295 feet Effective depth: measured 10141 feet Junk (measured) 270' Coil Tubing Equip. Fish, Top at 9300' (02/98) true vertical 9249 feet Casing Length Size Cemented M D TVD Structural Conductor 104' 20" 132' 132' Surface 2812' 13-3/8" 4388 sx Permafrost 2840' 2840' Intermediate 9103' 10-3/4" x 9-5/8" 1470 sx Howco Lite & Class 'G' 9131' 8388' Production Liner 1514' 7" 593 sx Class 'G' 8651' - 10195' 7981' - 9295' Perforation depth: measured Open: 9890' - 9920'; Straddle Packed (& Sqzd): 9687' - 9712', 9727' - 9742', 9755' - 9795' Non-straddle packed (& Sqzd): 9810' - 9823', 9843' - 9924' true vertical subsea 8799' - 9003' (five intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is ~correct to the best of my knowledge Signed t Dan Sto,e'~L:~'~" -.¢¢-Z..j...~-'- -- Title Engineering Supervisor Date Commission Use Only Permit Number I APl Number I &pprovalDaJe. See cover letter ¢~_//~2// 50-029-20184-01 ('¢" } 0 ," ~' ~ for other requirements Conditions of Approval: Samples Required []Yes 'J~ No Mud Log Required []Yes ~ No Hydrogen Sulfide Measures [~'Yes []No Directional Survey Required l~Yes •No Required Working Pressure for BOPE [-12M; F-13M; ~i~'5M; [] 10M; I--] 15M Other: ,, ..... rla, Signed By by order of Approved By !'.,2,.:id W .inhncfnn Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate IWelYName: IE-°4A I Well Plan Summary I Type of Well (producer or injector): [Producer I Surface Location: 4125'FSL, 502' FEL, Sec. 06, Ti iN, R14E X = 664,468 Y = 5,975,910 Target #1: 833' FSL, 3795' FEL, Sec. 31, T12N, R14E X = 661,125 Y = 5,977,825 Z = 8,988' TVDss Target #2: 1157' FSL, 3736' FEL, Sec. 31, T12N, R14E X = 661,175 Y = 5,978,150 Z = 8,988' TVDss Target #3: 1686' FSL, 2798' FEL, Sec. 31, T12N, R14E X = 662,100 Y = 5,978,700 Z = 8,987' TVDss Target End: 1921' FSL, 2092' FEL, Sec. 31, T12N, R14E X = 662,800 Y = 5,978,950 Z = 8,987' TVDss I AFE Number: 1 4Pl130 Estimated Start Date: [ 09/13/98I IMD 112,737' [ I Rig: I Doyon 14 Operating days to complete: 26 [ TVDss: 18,987' IKBE: 166'47' I IWell Design (conventional, slim hole, I extended horizontal sidetrack etc.): I Objective: Sidetrack out of existing 9 5/8" csg into the Kingak shale,, directionally drill 8 V2" hole thru Kingak, set 7" liner 10' into the Sag River, directionally drill to horizontal in Z2, steer thru (3) Z2 targets to TD (drilling a 2,200' horizontal section), run, cmt and test 4 1/2" solid liner, complete with 4 lA", L-80 tbg, (6) GLM's and WOA tail assy. Formation Markers Formation Tops MD TVD(ss) Sidetrack KOP 8,350' 7,666' Sidetrack from Whipstock out of 9 5/8" csg into Kingak shale formation. TSAG 9,659 8,595 Set 7" casing 10' into Sag River TSAD 9,797 8,690 TZ4 9,819 8,705 TZ3 9,959 8,795 TZ2C 10,056 8,850 CGOC 10,233 8,930 Target Sands 10,543 8,988 BHL 12,737 8,987 TD of three Z2 targets Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. 8 ½" 7" 26# L-80 Mod 1,510' 8,150'/7,540' 9,660'/8,653' liner BTC 6" 4 ½" 12.6# L-80 Mod 8,370' 9,510'/8,550' 12,737'/9,045' liner BTC 9 5/8" 4 ½" 12.6# L-80 Mod 9,410 comp1 BTC 30'/30' 9,440'/8,456' Logging Program: I Open Hole Logs: Drilling section: MWD/GR from KOP (8,350') to 10' into Sag River (7" liner shoe depth). MWD/GR from 7" shoe thru build section to horizontal DPC Platform Express + Sonic run thru build section. MWD/GR/Res run thru entire horizontal section. Sample catchers and rig site geologist on site before the Sag River. Mud Program: Special design considerations Drill to 7" csg pt. with 6% KCL Shale Inhibited Gel Free Sidetrack Fluid, initial Kick Off mud weight 10 ppg; in Kingak shale. Will raise mud weigh as necessary. Quikdriln Polymer system in horizontal hole section. Mud Properties at kickoff: I Drilling of Kingak interval Density 10 sec gel Yield Chloride Filtrate ph (PPG) Point s HTHP 10.0 6-15 10-20 30,000 10.0 8.5- 9.0 Production Mud Properties: [ 6" hole section Density LSRV LSRV Viscosity CI- pH (PPG) (cps) YieldPoint 8.7 35-55000 12-20 50-65 30000 8.5-9.0 to to to to to 8.9 35-55000 12-20 50-65 30000 8.5-9.0 4 Directional: KOP: 1) 8,350' MD, drill out of 9 5/8" csg via whipstock window at 303° azimuth, 33° inclination to 297° azimuth, 46° inclination to 7" liner set depth. Build angle to 90° inclination at 10° azimuth at Start target, hold angle and direction to target #2, drop and build thru Z2 and turn to 68°azimuth into target #3. Hold horizontal inclination thru target #3 turn to 72° at End Target and TD + 12,737' MD. Maximum Hole 93° in horizontal section Angle: Close Approach There are no close approach wells to this Well: wellbore. Cement Data: Casing/Liner P&A of original well 7", 26#, L-80 liner in 1,460' of OH 41/"y2 , 12.6#, L-80 liner 3,077' via 2 7/8" inner string Lead: Sxs/Wt/Yield Tail: Sxs/Wt/Yield 316/15.7/1.19 375/15.7/1.17 Comments NoP&A Class "G", 50% excess OH Class 'G' 15.7 ppg 50% excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. NO ANNULAR INJECTION IN THIS WELL. E-04A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Bottom hole pressure is 3,323 psi at 8,360' TVDss (estimated) Maximum shut-in casing pressure is 2,487 psi (assumes 0.1 psi/ft gas gradient to surface). Drilling Discussion Well Ob|ective This sidetrack targets Zone 2 sands 12' above the HOT. The well is designed to drill approximately 250' of horizontal section at 8,988' TVDss. The well is then drilled into the HOT for approximately 900'. This portion of the well will be used for future sidetracks that require an open junction. The idea behind putting the future open junction access in the HOT is because the pores between the sand grains is so occluded with tar that gas would not be able to communicate with the junction that woukld be left open between the E-04A liner and the future sidetrack well. After drilling 900' in the HOT, the well is inverted out of the HOT into a second fault block, again 13' above the HOT at 8,987' TVDss. This second target is approximately 800' long. Anticipated average initial rate is 2,300 BOPD. Expected incremental recovery is 1.258 MMBO. Drilling Objective The objective is to cut and pull the existing 5 V2" completion tubing @ 8,365 ft, mill window via whipstock in the 9 5/8" casing @ 8,350' MD, directionally drill 8 1/2" hole through the Kingak shale to TD + 9,670' (10' into the Sag River); run, cement and test 7" liner. Directionally drill 6" hole out of the 7" shoe to horizontal at + 10,500' MD. Run DPC logs. Geosteer through Z2 sands ( two targets) to TD at + 12,737'. The well will be completed as a Zone 2 producer with a 4 V2", L-80, 12.6# solid liner x 4 lA" 12.6#, L-80, tbg with (6) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. Perforation intervals will be determined after final log evaluations. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NUfND. SURFACE CLOSE APPROACH WELL SHUT-INS One adjacent well will need to be shut in for the rig move. Adjacent well E-35 is spaced 33' South and will need to be shut-in prior to the rig move. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROA~I-I WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plans due to close approach requirements. PORE PRESSURE: Pore pressure in the Kingak Shale is expected to be 7.7 EMW. The Kingak section will be drilled using 10 ppg mud due to shale mechanical instability. The mud weight will provide sufficient overbalance to reservoir pressure and not too high of an overbalance to create lost circulation while drilling the shale. The pore pressure in the Sag River (7" liner shoe) is expected to be near 7.7 ppg EMW and the Sadlerochit is expected to be near 7.8 ppg EMW. 8.7 - 8.8 ppg mud will be used drilling out of the Sag River and through the Sadlerochit zones and will provide sufficient overbalance to the reservoir pressure.. HOLE PROBLEMS Six mapped faults will be present while drilling this hole which could cause lost circulation and possible additional bit steering. The upthrown and downthrown faults could cause bits to track in the throw trend. Adequate lost circulation material will be on the location to handle any possible loss problem. The Kingak shale will be drilled with 10 ppg mud from 32° to 46° inclination. Casing Shoe Kick Tolerance The smallest kick tolerance for the casing shoes is calculated as infinite of influx assuming a swabbed gas influx at the bottom of the Sag River along the planned directional path. Based on 8.7 ppg MW (TSAG 9,660' MD & 8,653' TVD 8.0 ppg maximum reservoir pore pressure), and min. frac at the window 10.0 ppg . The casing shoe will withstand complete (gas) evacuation to surface based on predicted pressures. Pre-Rig Operations: 1. Pressure test the 9 5/8" packoff. If the 9 5/8" packoff tests, back out and check each LDS (check one at a time). If the packoff does not test, carefully cycle each LDS (one at a time). 2. Set a BPV in preparation of the rig sidetrack. Rig Workover Procedure 1. MIRU. ND tree, NU and test BOPE. 2. MU 2 1/16" Drill String w/1 3A,, overshot, Circ. wellbore to 8.7 ppg brine, RIH latch onto CT fish @ 9,300'. 3. POOH w/2.65" mill/1 3A" CT fish. 4. MU Cement milling BHA, mill cement to from 9,593' to 9,760', tag 'X' nipple plug @ 9,816'. 5. RU slickline POOH with 'X' plug 6. RIH with 2.65 milling assembly to 9,980'. Circ, well clean. LD small drill string. ?. Set BPV, ND BOPE, NU Tree. Move rig off well. Note: If the CT fish pulls free, cement squeeze plug milled up and 'X' nipple plug retrieved, then there will be no need to Sidetrack E-04. Rig Sidetrack Procedure (if CT fish does not pull free) o 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. POOH & LD small drill string RU e-line, RIH w/double anchor chemical cutter, cut 5 ?~" tubing @ 8,365'. Pull the 5 ~/2" tubing completion. Tubing cut at _+ 8,365' MD. Replace the leaking 9 5/8" packoff if necessary. Set 9 5/8"whipstock on top of 5 ~,~" tubing stub and mill window. Kick-off and directionally drill 8 ~/2" hole to 10' into TSAG + 9,670' MD. Run, cement and test 7" liner. Directionally drill 6" hole to horizontal + 10,500' MD. Run DPC log suite when reaching horizontal. Directionally drill the Zone 2 horizontal section to TD + 12,737' MD. Run and cement 4 ~/~", L-80 solid production liner. Perforate DPC Run 4 4/2", L-80 tubing completion. ND BOPE, NU and test tree. RDMO. 07/2B/1998 08:59 90?-344 30 ANADRILL DPC PAGE HaPker Ident~ficaUon MD N/S E/~ A) TIE-IN SURVEY 8299 go0 N 2t8~ B) TOP OF WINOOW 8345 913 N 2~03 C) KOP/CURVE 6/J00 8350 91§ N 220§ D) END 6/~00 CURVE 86]3 997 N 2346 E) 7' CASING POINT 9629 ;336 N 2997 F) CURVE tO/iO0' 9768 1382 N 3086 G) END t0/100 CURVE 10543 t988 N 3300 H) T~RGE/ ~1 10543 ~9~8'N 3300 I) CURVE ~8/t00 10872 2312 N 32~3 d) TARGET ~2 i0872 23t2 N 3243 K) ENO 18/J00 CURVE ~231 .256~ N 30J4 L) ~RVE 15/JO0 ~1276 2576 N -2972 M] LOW 90 DEGREE PT 11329 2592 N 292! N) END 15/100 CURVE 11352 2600 N 2900 O) 'INTERMEDIATE PT 11352 2600 N ~900 P) CURVE t2/100 I~99~ 284~ N 2306 E-O4A -(PBA). PLAN"V.I'EW ' CLOSURE .' 3468 feet at Azimuth 332.50 DECLINATION.' +27.968 (E) SCALE., ' ~ inch : 600 feet DRAWN. - 23 Jul J998 - . /lnadrJ ] ] Schlumberger 1200 3900 3600 3300 3000 2700 2400 2100 · 1800 1500 1200 900 600 300 0 300 <- WEST' EAST -> 7200 76O "'SHAR'E 'D 'SEc v :CES " DRILL'i'NG ..... I _ II Ij ii111 i i ii J i i i ii im iil i i i i iii ii _ ! ii i i i i i iii ii i i i i iii i ill .......... '-~ > !-ISecti°n at: 57 37 I .-~ "~'J TVD Scale.: 1 inch : 400 feet o. rH jul JDep scale,: ~. inch = 400 feet , J ~ ~ ~_. I ~ark~r IdBn~ification ~O BKB SEOTN INCLN ' ' -'~ ~ '~5 ~~ ~ A) TIE-IN SURVEY e~976Bt-,354 ~O.aB ; e) ~aP OF ~iNDO~ B~5 77~0 -~363 3~.Ot u ~ ~ , 'C) KOP/C~vE 6/i00' 8350 7724 -i364 3~.02 J Z ~-- > ' F) cURVE JO/~O0 9768 87~ -i854 '46.2~ ) .... ,~:t' H) T~ET ~'t 10543 ~46 -17089O.OC Il C~VE 18/~00 1087~. ~48 -148590.0C g 'd) 1A~GEI ME 1OB7~ :904~ -~4B5 0 .... ....... .... -, .......... K) END 18/i00 C~VE 1)83~ g069'-~158 83.51 L) ~URVE iS/JO0 ~76 ..9074 -JIM 83.51 ' _ . .... 'H) LOW 90 OEGREE Pl' lt~9 ' 9077 -lOB3 90.0~ , N) END iS/JO0 CURVE ~135~ '9078 -104O 92 0 ........... '~;' ' "' m...- -..m ' O)P)o) CU~EINTE~DIAIETAR~Ti~/IO0.~3 PT ~135~1ig941t994 ,' g076'90459045 ~1040_4~0_410 9~.79~.79~.7 0 .....~ __j R) 90 DEGREE PT i~3~ 9044 '-372 90.0 ~ ~. ~ ___E_~ .............. S) E~D 18/lOD CURVE 120B3 .9044 -37~ . B9.9 ~m~¢~- -~ l) 4-i/2" .L]NER P~ 12737 ~ 3~0 89.9 ~0- ~ ~:,::::~ - ~ _ U) lD. 12737 g045 3i0 89.9 ,, , ,, , , , ~ , .......... ,.. . 10- __ ~ .T~T,~ ~,.- · .._. · ___~ ............ "'.j_"."- =~:=:=: :r 'm~ ~ ...... ~-""'> ........ ~'¢~ ............... ~ ....... -~+' ..... ....... ~L~ 10 - · ~ ..... ' '"-. ' ' -,' ........... - '- " - ..... "- ' -"- ...... ...... , .............. ........ )0~ . ~- , ...... ) ......... ,,, h~ ..... " ,' 8400 -24oo -22oo -2ooo -iBoo -16oo -~4oo -12oo -iooo -~oo -6o0 -4oo o 200 400 600 Section Departure )i' .. z AnadrllL Schtu,floerger Alaska District 1111 East 80th Avenue A/~chora~e, Al{ 99518 (907) 349-4511 Fax 344-2160 DIRECTIONA'h WELL PLAN for SHARED SSRVICES DRILLIN(~ Nell ......... : E~04A (PSA) Field ........ : Prudhoe May, E-Pad Com~utatton..: Minimum Curvature Uni ts ........ : P~ET Surface Lat..: 70.340%8695 N Surface Long.: 148.66527077 W Le~al Description Surface ...... : 4125 FSi S02 FEL S06 TR]_N Ri4H UN T/e-in ~uz-vey: 5025 FSL 2683 FEi S06 TllN FL14~ ~ ~ ~2 ....... : L~57 FSi 3737 ~ S31 T~2N R14E ~ ~T ~3 ....... : 1686 FSi 2798 PBL S31 T~2N R34E ~ B~ .......... : 1921 PSi 2092 F~L 931 TI2N R14E ~ LOCATrONS - ALASKA Zone: 4 X-Coord ¥-Coord 664468.00 5975910.00 662265.~0 5976762.00 66312~.00 6611~.29 $978150.1~ 662300.00 S978700.00 662800.00 STATION M~SURED INCI.~ DIRECTION V~RT~CA/~-DEPTHS SHCT~ON IDENTIFICAT[0N DEPTH ANULE AZX~H T~ B~-SHA DEPOT TIE-IN S~V~ 8299.48 30.88 303,59 7680.60 7622,60 -~353.77 8300,00 30.88 303.60 7681.05 7623.05 -~353.88 OP WI~W 8345.00 3~.01 304.34 ~919.64 7661.64 KOP/~VE 6/~00 8350,00 31.02 304.43 7723.93 ~665.93 -1364,07 8400.00 33,88 302.70 7766.L2 7708,12 -13~4.92 Prepared ..... : 93 Jul 1993 Ver~ seth az.: 57.37 KB elevatton.~ 58.00 ft Magnetic Dcl~: +2~,968 (~) Sca~e Pactor,: 0.99993073 Conve~C3ence..: +1.~5695367 ANADRILL "' ' AKA..[)PC FEASIBILITY 'PLAN NOT' APPR:OVE'D FOR EXECUTION PLAN _ ~EL/~{EAD X Y FACE 900.~8 N 2183.83 'W 662265.10 5976762.00 900.33 N 2~84,05 W 662264.88 5976362.1~ ?2R 913.26 N 220~.24 ~ 6622~5.41 5976774.65 ?iR 914.?3 N ~=~mmmmtmsnm{~==~mmm t=a= mmm~ ~00 mmmm cTIH 0,90 0.90 2205.37 ~ 662243.25 5976776.05 19~ 0,90 2227,73 W 662220.57 5976790.38 17h 6.00 Z 6/300 ctmvz 8450.00 36.75 3ol.2~ 8500.o~ 39.64 299.91 8550.00 42.54 298.75 8600.00 45,46 29~.72 8613.07 46.22 297.47 (Anadrll~ (c) 98 E04A~SA 3.2C 8:36 AM P) 7606.9L 7748.91 7846,21 7788,2l 7883.88 782S.88 7919,85 7861.85 7928.95 ?870.95 -1387.33 -1401.29 -3436.74 -1433.65 -1438.31 944.01 N 2252.26 W 662195,72 5976805.11 161 6.00 960~52 N 2278,88 W 662168.76 ~976820.23 ~L 6.00 976.60 N 2307,53 W 662139.96 5~76~35.69 145 6.00 993.03 N 2338..13 N' 662308.8l 5976853.43 ~3~ 6.00 . . 997.37 N 2346.44 W 662100.4~ H976855.S9 HS 6.00 STAT[ON MEASURED I DENT ! FrCATION DEPTH CASING POINT ~629.20 TS~$R (UFTf{]%Ot~N) ~ 9659.55 SKUBLZK (UPTHROI~) 9734.71 CURVH 10/100 9767,68 TSAD 9797.04 TZ4 TZ3 TZ2C 9800.00 46.99 9819.32 42,52 988o.oo 9900,00 50.33 9950.00 52.47 CGOC 9959.20 52.90 1O000,0O 54.88 10050,00 57.52 10055,83 57.84 10£O0.00 60,35 END 10/100 C~RV~ 30350.00 63.35 10200.00 66.48 10232.q3 68.59 10250.00 69.73 10500.00 73.06 10350,00 76.47 30400.00 79.94 10450.00 83.44 I0500.00 86.97 10542,95 90.00 PROPOSED WELL PROFILE DIR~CTZON AZfMUTE 297,47 297.49 297.47 301.80 304 .'mi 308.25 31.4.38 39-0.16 321.29 325.60 330.71 331.29 335.$2 VERTICAL-DEPTI{~ SECTION COORDE,ATBS-FROM ~BK~ Zone 4 TOOL DL/ TVD SU~-SEA DEPART ~ELLKEAD X Y ~AcE 300 8632.00 8574,00 -1804.02 1335,80 N 2997,37 W 661442.26 5977179,6% HS 0,00 8653.00 8895,00 -18~4,95 1345,91 N 3016.82 W 661422.60 5977189,32 ~S 0.00 8705,00 8647,00 -1842,00 1370,94 N '3064,96' W 661373,92 5977213,98 ~$ 0,00 8727,7{ 8669.74 -1853,83 1~8~,89 N '3086,02 W 66~352,6] 5977223.7~ .78R 0~00 · 8748.00 ~690,00 -1863,84 3392,40 N ~104.64 W 6~333-78 $997233.8~ 75R ~0.00 8750,02 8692.02 -1864.78 1393,54 N 3/06.48, W 661331,.9~ S97723%.96 ?5R 10,00 8763,00 8705,00 -1870,56 ~401,£'9 .N ]1~8,~5'W 66£319,98 5977242,36 7~R 10,00 8~83,67 8725,67 -1878.81 ~414,77 N' 3136,~4'W 66~301,20 $9772~5,53 70R ~0,00 8836,22 8758,22 -£889.27 14~9,84 N 3165,2i W ' 66~272,19 9977~79,96 66R 10,00 8847.42 8789.42 -1896.09 1468,54 N 319~,68 W 661245,10 5977308,07' 6~R 10,00 BSSB,00 8797.00 -1896,94 1474,20 N 3196,32 8877.0~ 8819.0~ -1899,22 1600,65 N 32]S,97 8904.88 8846.88 -~898,6l ~835.94 N 3237,84 8908,00 8850.00 -~898.30 1~40,~ N 3240,23 8930.69 8872.69 -1894.30 1574.i3 N 3257.~7 340.07 8954.29 8896.29 -1886.30 344.37 8975.49 89l?.49 -1874.68 347,07 8988.00 8930.00 -1865.16 348,47 8994.15 8936,~5 -1859.53 352.40 9010,10 8952,10 -1840.96 356.19 90~3,2~ 8965.24 -1819.11 359.87 9033.46 8995.46 -L~94.15 3.48 9040.69 8982.69 -L$66o27 7,03 9044.8? 8986,87 -1737.68 10.05 9046.00 8908,00 -1707.56 661240,0% 59773~3,6~ 62R ~0,00 661220,13 5977339,65 60R 10,00 66~197,48 5977374,44 ~TR 10.00 661594.99 5977378,70 56R 10.00 66~177,325977412,20 ~4R 10,00 1614.94, N 3273,80 1658.04 N 3287.60 W 1687.35, N 3'295/05 1703,13 N 3298,4~ 1749,84 N 3~06.33 661[59.80 5977452.63 661£4~.05 S977495.42 661136.96 S977524-5~ 661133.20 ~979540.2~ 6611~4.~2 5979586.7T S2R ]0'.00 ~.~OR'10.O0 49R ~0.00 ~9R %0.00. '49R 10.00 t797,83 N 33~X.I1 W 66t118,48~5977634.64 [846.73 N 3312.78 W 661i35.74 6977683.49 [896.16 N 331T.33 W 661116.1~ 5977532.94 1945.76 N 3306,76 W 661i£9,58 597778~,6~ 1988.01 N 3'~00.42 W 661125,00 597~825.00 47R 10.'00 46R 10.00 45X 10.00 ~S 10.00 TARGI1T ~1 10542,75 90.00 TARGET SA/{I)S 10542,75 90.00 CUR'~ E 18/100 ~0871.78 90.00 (A~adrlll (c) 98 ]]04APSA 3.2C 8:36 10.05 9046.00 8988.00 -1~0'/.56 ~0.05 9046.00 8988.00 -3707.56 ~0.O5 9046.00 8988.00 -Z484.90 1988.01 N 3300.42 W 661126.00 59778'25.00 1988.01 N 3300,42 ~' 6~L[25.00 597~825,00 23~2.00 N 3243.00 W 661175.29 ~978150.1~ ~8 10.00 H8 ao.oo 9TR 0.00 B-0qA (PSA) STATION X BE~TT Y P ! CAT£ON TARGET U2 ~OT ~NrD 18/1.00 CU~ 1£/100 LOW 90 D]DGR.HE PT ~ND 15/~00 CURVE CU~.VI~3 12/100 TARGET ~3 90 DEGREE PT HND 12/100 CURVm 4-L/2" LINER PT TD TZ1B ~ASUR~ INCLN DHFTH ANGLR [087~.~8 90.00 tog00.00 89.37 I0950.00 88,27 1£000.00 87,22 11050.00 86,~3 lll00.00 85.33 13326.98 84.90 31~50.00 84.H5 13200.00 83.90 11231,43 83.57 11295.96 83,57 11300.00 86,48 11329.13 90,00 11350.00 92.53 13351.98 92.77 [1351,98 92.77 IL993,58 92.77 1~993.58 92.77 12000.00 92,3[ 1]032.34 9G,00 12033.41 89.92 12736,98 B9.92 k2736,98 89.92 PROPOSED WELL PROFILH OrRECTIO~ V~RTIC. AL-DEpTHs AZIMUT~ T~D SUB-SEA k0.05 9046.00 8988.00 [5.09 9046.1~ 8988.1~ 24.02 9045.18 8989.18 32.97 9049,15 899~.15 41.93 9052.02 8994.02 mmmmm~tlmm S~CT]O~ DE PA ET -1484.50 -]-464.49 - ~425 .'04 -].38]..33 -]-334.45 50,91 9055,70 8997.70 -1285.55 55.76 9058.00 9000.00 -1258.74 59.91 9060,12 9002.[2 -1235.82 68.93 9065,16 9007.£6 74.61 9068,59 9010.59 -1356.26 74.63 9093.57 9015,S7 72.47 90?5.66 9057.66 69.89 9076.SS 90lC.SS 68.04 9076.09 9018.09 67.86 9076.00 9018.00 6~.86 9076.00 9018 67.86 904S.00 8987 6~.86 9045'.00 8987 68.48 9044.71 8986 ?l.'60 9044.06 8996 Jul 1998 Pa~e 3 COORDINATES-FROM A~ASKA Zone 4 TOOL DL/ WELLHEAD X Y PACH 3 O0 23~2.00 N 3243.00 W 661175.29 5978150,~5 97R 0,00 2339.53 N 3236.86 W 661180.83 5978177,80 97R 18,00 2386.59 R 3220.].5 N 662196.50 59?8225.21 97R 38.00 2430.45 N 3].96.~3 W 661219.3~ 5978269,~8 9~R 18,00 2470.04 ~ 3166.0~ W 661248.79 $978~09.83 96R 18.00 71.7L 71.71 71,71 2504.38 N 3129.93 2520.43 N 3108.]'7 2532.63 N 3088,9'7 2554.09 N 3044,15 2563.85 N 3034.49 66i284.].1 59?8344.95 95R [8.00 66k305,31 ~9'78361.46 9~R LB.00 661324,43 ~9'78~7~.09 9~ %8.00 661368,7'7 ~9~8396.$2 94R £B.00 661398.2l 59'7840~.93 HS , ~8.00 -LLL~.99 -L091.00 -106227~ -10~0.35 2575.~9 N 2971.82 W 661440.61 59784L9.6]. 36b 0.00 2582.38 N 2948.86 W 661463.41 59~8426.89 36~ 15.00 2591,'76 N 292]..33'W 661490.7) S978436.88 36L 1~.00, 2599.26 N 290L..83 W 66~510.0~ 5978444,80 36L 1~.00 2600,00 N 2900.00 W 661511.87 59784~.~8 ~S ~,00 .00 -1040.35 2600.00 N 2900.00 W 66L51~.87 5978445 ,00 -410.22 2841.47 N 2306,39 W 662100.00 5978700 .0O. -4~0.22 284]..47 N 2306;39 ~ 662L00,00 5978?00 ,72' -403.92 2843.86 N 2300.43 ~ 662].0~,90 5978702 ,06 -3'72.37, 2854.89 N 2~70.04 ~ '662136,04 59787]-4 9044.06 8986.06 9045.00 8987.00 9045.00 8987.00 9[0B,O0 9045.00 92~8.00 9160.00 .58 }{S 15,00 · 00 126R 0.00 .00 126R '.0.00 .~2 127R L2.00 .2L 127R '12 00 -37i.34 310,32 310.32 2855.23 N 2269.03 W 662137.04 5978714,57 3076,0? N 1601.09 M 662800.00 59?8950,00 30'76,07 N 1601.0~ W 662800.00 59~8950.00 12.00 0.00 0.00 ANADRILL AKA-DPC FEASIBILITY PLAN' NOT APPROVED FOP, EXECUTION PLAN .... -.,j , 3~ Z "U G') ITl TREE: 6" CIW E 0 4 KB. ELEV = 56.52' WELLHEAD: McEVOY " - BF. ~( 28.60' ACTUATOR: OTIS ( ,I 5112"SSSV LANDING NIPPLE 1 212511 8 (OTIS )(4.562" ID) Foe - 1 GAS LIFT MANDRELS 13-3/8",72#/11, N-80, BTRS. I 28401 - (~~IS~~~~A L:'I,~~) 8 3975' 3910' 7 5605' 5298' 51/2" 6 7140' 6602' KOP: 3000' 5 8268' 7660' MAX ANGLE: 35° @ 5700' 4 8415' 7725' McMURRAY "FMHO" w/1" ßK LATCH 3 9389' 8550' 2 9489' 8634' 51/2",17#/11, L-80, IJ4S TUBING 31/2" 1 9590' 8719' TUBING ID: 4.892" CAPACITY: .0232 BBUFT I I 51/2" SLIDING SLEEVE I 84841 1 OTIS "XA" (4.562" ID) TUBING SEAL ASSY. 1 85511 I 3 1/2" 9.3#/11, L-80, AB MOD - 9-5/8" BAKER PACKER 1 85651 1 EUE 8-R TUBING ( FHL) (4.000"ID) (2.992" ID) (CAP = .0087 BBUFT) 1 85731 1 TOP OF 1 1 1 7" LINER 8651 Straddle Perfs Squeezed 1/19/98 9-5/8",47#/11, 1 1 TOe @ 9593' eTMD N-80, BTRS 91311- Fish consists of 270' 1,75" CT, CTC, DCV, Disc, Clrc Sub, Tandem mtr, 2.65" mill 1 wlball On disc seat. See BHA #2 of telex Feb 1,1998. Top of fish @ 9300' 6 - BLAST JOINTS :TOP 9691 :BTM 98101 98101 CaC03 fill from 9817' to 9760' 1 1 98091 PERFORATION SUMMARY 31/2" "X" NIPPLE I 1 (OTIS) (2.750" ID) 98161 REF LOG: SWS - BHCS - 2-1-76 31/2' TBG TAIL 1 98171 I SIZE SPF INTER AL OPEN/SOZ'D (BAKER WLEG ) 4" 4 9687 - 9712' SOZD 1/19/98 (ELM D) I 1 1 4' 4 9727 - 9742' 9798 4" 4 9755" 9795' ABOVE ERFS BEf ND STRADDLE 4" 4 9810' - 9823' SOZD 4/24/96 Cement 9980 - 10000' 4" 4 9843 " 9858' 2 1/8" 4 9858 - 9924' 21/8" 4 9890 - 9920' 0 EN Cement 10100 -10120' PBTD 110,1411 7",29#11t, L-80, BTRS 110,1951- DATE REV. BY COMMENTS PRUDHOE SAY UNIT 4-12-76 INITIAL COMPLETION WELL: E-04 (24-31-12-14) 12-20-84 RWO API NO: 50-029-20184 4/26/96 Tave Post Sqz perts SEC 6 : TN 11 N : RGE 13E 1/20/98 JTP Straddle Squeeze 2/09/98 DDW AddCTFlsh BP Exploration (Alaska) TREE: 4"CIW E-04A KB. ELEV = ' WELLHEAD:McEVOY BF. ELI~t ACTUATOR: (, - 41/2'SSSV LANDING NIPPLE (3.S1; ID) I Foe GAS LIFT MANDRELS I 13-3/S", 72#/ft. I 2840' I - N-SO, BTRS. I NQ MD(BKB) TVDss I 1 2 I KOP I 3 4 MAX ANGLE: 5 6 41/2", 12.6#/ft, L-SO, IBT TUBING TUBING ID: 3.958' CAPACITY: .01522 BBUFT 7" Liner Top @ 8150' MD 4-1/2" Liner Top @ 9850' MD 4-1/2" Liner Shoe @ 12,828' MD ..... Whipstock @ 8300' MD ~, 'OIII' 'OIII 5-1/2" Sliding Sleeve 7" Liner Shoe @ 8484' MD @ 10,006' MD 9-5/8" Packer @ 8565' MD Top of Fish @ 9300' TOe @ 9593' CTMD Cae03 fill from 9817' - 9760' 3 1/2" "XX" Plug Cement 99S0 - 10000' Cement 10100 - 10120' PBTD 110,1411 1- " . 29#/1t, L-BO, BTRS 110,1951 1- ~~~:~:;:~:~~~:~~~~~:~:~:~~~:~:~:~:~:~:~:;:~:~:~ DATE RE . BY COMMENTS PRUDHOE SAY UNIT I-'roposea ::ilaatraCl< vompletlon WELL: E-04 API NO: 50-029- SEC 6: TN 11N: RGE 13E BP Exploration (Alaska) I - DATE / CHECK NO. H 1411 G 4 o~/o3/,~ I 0014116~ VENDOR AKAS~AST 14 OO DATE INVOICE / CRED~ MEMO DE~RIPTION GRO~ DISCOUNT N~ 07319~ CKO73ZgSC ~00. O0 ~00. O0 H~NDL[NG INST- S/E TERR[E HUBBLE X~S · WELL PERMIT CHECKLIST COMPANY PROGRAM: exp [] dev'~edrll,,~serv. [] wellbore seg II ann. disposal para req II FIELD & POOL ADMINISTRATION ENGINEERING DATE INIT CLASS _~~._,,, GEOL AREA UNIT# ,/'/' _~,.~/"C~ ON/OFF SHORE GEOLOGY DATE 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper dislance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12, Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CM]- will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved. 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to .._~(3(:::> (:D psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... Y N Y N Y N Y N Y N Y N Y N 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N.,,~_ 31. Data presented on potential overpressure zones ....... ~ .,, , ~/,~ 32. Seisrn c analysis of shal ow gas zones ..... ' ........ 33. Seabed condition survey (if off-shore) ............. 34. Contact name/phone for weekly progress repods ...... / Y N [exploratory only] ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a poom; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N Y N ....................................................................................................................................................................................................................................... Y N Y N .................................................................................................................................................................................................. Y N APPR DATE GEOLOGY: COMMISSION: DWJ RNC . co Comments/Instructions: M c, hel~lisl i(.'v 05/29/9B Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Sat Jul 10 12:55:08 1999 Reel Header Service name ............. LISTPE Date ..................... 99/07/10 Origin ................... STS Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN ---~ Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/07/10 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NkME: API NLIMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MM-90042 J. FOLEY R. BORDES RECEIVED ",, 1,5 !999 E-O4A 500292018401 BP EXPLORATION (ALASKA) , INC. SPERRY-SUN DRILLING SERVICES 10 -JUL- 99 MWD RUN 3 AK-MM-90042 R. MCNEILL R. BORDES MWD RUN 4 AK-MM-90042 R. MCNEILL R. BORDES JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 AK-MM-90042 R. MCNEILL R. BORDES MWD RUN 5 AK-MM-90042 R. MCNEILL R. BORDES MWD RUN 5 AK-MM-90042 R. MCNEILL R. BORDES JOB NUMBER: LOGGING ENGINEER: MWD RUN 6 AK-MM-90042 R. MCNEILL MWD RUN 6 AK-MM-90042 R. MCNEILL MWD RUN 7 AK-MM-90042 R. MCNEILL OPERATOR WITNESS: R. BORDES R. BORDES R. BORDES JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 7 AK-MM-90042 R. MCNEILL R. BORDES 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: MWD RUN 8 AK-MM-90042 R. MCNEILL R. BORDES MWD RUN 8 AK-MM-90042 R. MCNEILL R. BORDES 6 liN 014 4125 502 56.90 56.90 28.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 8347.0 7.000 9682.0 8.500 4.500 12714.0 6.000 12714.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND tS NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL, DUAL GAMMA P~AY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND PRESSURE WHILE DRILLING (PWD). 4. MWD RUN 3-8 ARE DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PPIASE-4 (EWR4) . 5. MEASUREMENT AFTER DRILLING (MAD) PASSES WERE PERFORMED AFTER RUNS 4-8 WHILE PULLING OUT OF THE HOLE AFTER EACH RUN. THE MERGED MAD PASS DATA APPEARS AS A TAIL TO THIS LOG. 6. DEPTH SHIFTING/CORRECTION OF MWD AND MAD DATA IS WAIVED AS PER THE E-MAIL FROM D. DOUGLAS FOR T. LOVE OF BP EXPLORATION (ALASKA), INC. ON 06/19/99. MWD DATA IS CONSIDERED PDC. 7. MWD RUNS 2-8 REPRESENT WELL E-04A WITH API#: 50-029-20184-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12714'MD, 9044'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED DUAL GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. CURVES WITH THE EXENTSION "M" DENOTE DATA OBTAINED DURING A MAD PASS. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8345 0 12672.5 ROP 8378 0 12713.0 FET 9659 0 12679.5 RPD 9659 0 12679.5 RPM 9659 0 12679.5 RPS 9659 0 12679.5 RPX 9659 0 12679.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 8378.0 9682.0 3 9682.0 10325.0 4 10325.0 10930.0 5 10930.0 11510.0 6 11510.0 11937.0 7 11937.0 12110.0 8 12110.0 12714.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 8345 12713 10529 ROP 0 827.34 49.079 GR 15.47 570.36 66.3745 RPX 0.17 1743.11 17.9219 RPS 0.2 1743.23 26.6252 RPM 0.45 2000 42.3722 RPD 0.44 2000 54.3468 FET 0.4097 89.8348 3.26495 Nsam 8737 8671 8656 6042 6042 6042 6042 6042 First Reading 8345 8378 8345 9659 9659 9659 9659 9659 Last Reading 12713 12713 12672 5 12679 5 12679 5 12679 5 12679 5 12679 5 First Reading For Entire File .......... 8345 Last Reading For Entire File ........... 12713 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: .5000 STAi~T DEPTH 10369.0 10373.5 10373.5 10373.5 10373.5 10373.5 STOP DEPTH 12676 0 12683 0 12683 0 12683 0 12683 0 12683 0 MAD RUN NO. MAD PASS NO. MERGE TOP 4 10369.0 5 10891.0 6 11465.0 7 11896.0 8 12110.0 MERGED MAD PASS. $ MERGE BASE 10891.0 11465.0 11896.0 12072.0 12714.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD API 4 1 68 4 2 RPX MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPM MAD OHMM 4 1 68 16 5 RPD FLAD OHMM 4 1 68 20 6 FET MAD HOUR 4 1 68 24 7 Name Min Max Mean DEPT 10369 12683 11526 GR 8.03 143.58 34.034 RPX 0.48 22.21 9.97273 RPS 0.43 36.99 16.5214 RPM 0.44 140.17 22.0815 RPD 0.47 2000 27.7527 FET 2.8014 58.7488 21.2814 First Last Nsam Reading Reading 4629 10369 12683 4615 10369 12676 4620 10373.5 12683 4620 10373.5 12683 4620 10373.5 12683 4620 10373.5 12683 4620 10373.5 12683 First Reading For Entire File .......... 10369 Last Reading For Entire File ........... 12683 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NLIMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8345.0 9651.5 ROP 8378.0 9681.5 $ LOG HEADER DATA DATE LOGGED: 22-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: INSITE VER. 3.2 BUILD 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 DEPII v2.22; EWR-4 MEMORY 9682.0 8378.0 9682.0 31.0 47.7 TOOL NUMBER l193HWG6 8.500 8.5 6% KCL 10.40 56.0 8.9 29000 3.8 .000 .000 .000 .000 61.7 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 8345 9681.5 9013.25 2674 8345 GR 69.16 344.16 127.977 2614 8345 ROP 0.07 281.7 37.757 2608 8378 Last Reading 9681.5 9651.5 9681.5 First Reading For Entire File .......... 8345 Last Reading For Entire File ........... 9681.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP 9652.0 9659 0 9659 0 9659 0 9659 0 9659 0 9682 0 STOP DEPTH 10284.0 10291 5 10291 5 10291 5 10291 5 10291 5 10324 5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: 12 UPG 3 DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MITD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 27-DEC-98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 10325.0 9682.0 10325.0 47.1 68.5 TOOL NUMBER 1168GR4 1168GR4 6.000 6.0 QUIKDRIL-N 8.70 54.0 9.1 30000 5.5 .125 .068 · 093 · 180 53.9 .6 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MWD 3 API 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 ROP MWD 3 FT/H 4 1 68 FET MWD 3 HOUR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 9652 10324.5 9988.25 1346 GR 19.14 570.36 64.156 1265 RPX 0.17 1743.11 28.824 1266 RPS 0.2 1743.23 45.4325 1266 RPM 0.76 2000 107.129 1266 RPD 0.77 2000 129.442 1266 ROP 0.73 827.34 61.8294 1286 FET 0.4097 89.8348 4.48107 1266 First Reading 9652 9652 9659 9659 9659 9659 9682 9659 Last Reading 10324.5 10284 10291.5 10291.5 10291.5 10291.5 10324.5 10291.5 First Reading For Entire File .......... 9652 Last Reading For Entire File ........... 10324.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10285 5 FET 10292 5 RPD 10292 5 RPM 10292 5 RPS 10292 5 RPX 10292 5 ROP 10326 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MI/D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: STOP DEPTH 10890 0 10897 0 10897 0 10897 0 10897 0 10897 0 10930 0 29-DEC-98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 10930.0 10325.0 10930.0 69.8 92.0 TOOL NUMBER 1168GR4 1168GR4 6.000 6.0 QUIKDRIL-N 8.70 54.0 9.1 30500 5.3 .140 .076 .110 .220 53.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 RPX MWD 4 OHMM 4 1 68 8 3 RPS MWD 4 OHMM 4 1 68 12 4 RPM MWD 4 OHMM 4 1 68 16 5 RPD MWD 4 OHMM 4 1 68 20 6 ROP MWD 4 FT/H 4 1 68 24 7 FET MWD 4 HOUR 4 1 68 28 8 Name Min Max Mean Nsam DEPT 10285.5 10930 10607.8 1290 GR 15.99 84.58 25.199 1210 RPX 0.52 30.06 17.3593 1210 RPS 0.5 49.23 26.9422 1210 RPM 0.45 86.57 32.6443 1210 RPD 0.44 99.09 36.4632 1210 ROP 0.24 567 42.2913 1209 FET 1.0322 24.5987 2.76779 1210 First Reading 10285 5 10285 5 10292 5 10292 5 10292 5 10292 5 10326 10292.5 Last Reading 10930 10890 10897 10897 10897 10897 10930 10897 First Reading For Entire File .......... 10285.5 Last Reading For Entire File ........... 10930 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10890 5 10897 5 10897 5 10897 5 10897 5 10897 5 10930 5 SURFACE SOFTWARE VERSION: 12 UPG 3 DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH' 11469 0 11476 0 11476 0 11476 0 11476 0 11476 0 11509 5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 30-DEC-98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 11510.0 10930.0 11510.0 84.4 92.1 TOOL NUMBER Pll30GR4 Pll30GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUIKDRIL-N 8.80 56.0 8.8 29500 5.4 .160 .082 .120 .250 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 RPX MWD 5 OHMM 4 1 68 8 3 RPS MWD 5 OHMM 4 1 68 12 4 RPM MWD 5 OHMM 4 1 68 16 5 RPD MWD 5 OHMM 4 1 68 20 6 ROP MWD 5 FT/H 4 1 68 24 7 FET MWD 5 HOUR 4 1 68 28 8 58.3 First Name Min Max Mean Nsam Reading DEPT 10890.5 11509.5 11200 1239 10890.5 GR 15.47 69.34 26.2134 1158 10890.5 Last Reading 11509.5 11469 RPX 1.17 28.41 13.2949 1158 RPS 1.4 40.57 18.2166 1158 RPM 1.49 54.8 19.85 1158 RPD 1.42 894.48 22.7199 1158 ROP 1.04 383.84 66.3505 1159 FET 0.497 22.7502 2.29569 1158 10897 5 10897 5 10897 5 10897 5 10930 5 10897 5 11476 11476 11476 11476 11509.5 11476 First Reading For Entire File .......... 10890.5 Last Reading For Entire File ........... 1'1509.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/1© Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11469 5 11476 5 11476 5 11476 5 11476 5 11476 5 11510 0 STOP DEPTH 11897.0 11904.0 11904.0 11904.0 11904.0 11904.0 11937.0 01-JAN-99 SURFACE SOFTWARE VERSION: INSITE VER. 3.2 BUILD 12 UPG 3 DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 DEPII v2.22; EWR-4 MEMORY 11937.0 11510.0 11937.0 85.9 92.9 TOOL NUMBER Pl130GR4 Pll30GR4 6.000 6.0 QUIKDRIL-N 8.90 58.0 8.5 29500 5.2 .150 .090 .110 .250 61.1 .6 Name Service Order Units Size Nsam DEPT FT 4 1 GR MWD 6 API 4 1 RPX MWD 6 OHMM 4 1 RPS MWD 6 OHMM 4 1 RPM MWD 6 OHMM 4 1 RPD MWD 6 OHMM 4 1 ROP MWD 6 FT/H 4 1 FET MWD 6 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean Nsam DEPT 11469.5 11937 11703.2 936 GR 15.88 68.53 23.2895 856 RPX 2.71 27.3 15.8903 856 RPS 3.53 40.44 23.8619 856 RPM 3.48 40.82 26.353 856 RPD 2.91 130.84 28.504 856 ROP 1 213 43.9216 855 FET 0.8056 23.4621 3.04566 856 First Reading 11469.5 11469.5 11476.5 11476.5 11476.5 11476.5 11510 11476.5 Last Reading 11937 11897 11904 11904 11904 11904 11937 11904 First Reading For Entire File .......... 11469.5 Last Reading For Entire File ........... 11937 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: FILE SUMMARY .5O00 VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11898 0 11905 5 11905 5 11905 5 11905 5 11905 5 11938 5 SURFACE SOFTWARE VERSION: 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12070 5 12077 5 12077 5 12077 5 12077 5 12077 5 12110 0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 02-JAN-99 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 12110.0 11937.0 12110.0 91.8 93.4 TOOL NUMBER Pll30GR4 Pll30GR4 6.000 6.0 QUIKDRIL-N 8.80 64.0 8.7 29000 5.8 .140 .078 .100 .220 63.3 TOOL STA/~DOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 7 API 4 1 68 RPX MWD 7 OHMM 4 1 68 RPS MWD 7 OHMM 4 1 68 RPM MWD 7 OHMM 4 1 68 RPD MWD 7 OHMM 4 1 68 ROP MWD 7 FT/H 4 1 68 FET MWD 7 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 11898 12110 12004 GR 17.35 115.8 45.707 RPX 5.15 35.03 14.8587 RPS 5.26 44.67 20.9672 RPM 4.93 91.26 31.3581 RPD 6.75 2000 126.35 ROP 1 371 62.7093 FET 0.4441 31.5312 6.82386 Nsam 425 346 345 345 345 345 344 345 First Reading 11898 11898 11905 5 11905 5 11905 5 11905 5 11938 5 11905 5 Last Reading 12110 12070.5 12077.5 12077.5 12077.5 12077.5 12110 12077.5 First Reading For Entire File .......... 11898 Last Reading For Entire File ........... 12110 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11898.0 12078 0 12078 0 12078 0 12078 0 12078 0 12111 0 SURFACE SOFTWARE VERSION: 12 UPG 3 DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12070 5 12679 5 12679 5 12679 5 12679 5 12679 5 12713 0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (PT) : BOREHOLE CONDITIONS 04 -JAN- 98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 12714.0 12110.0 12714.0 88.2 92.2 TOOL NUMBER Pll30GR4 Pl130GR4 6.000 6.0 MI/D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 QUICKDRIL-N 8.80 66.0 8.7 28000 5.6 .130 .070 .100 .180 70.5 i .6 Name Service Order Units Size Nsam DEPT FT 4 1 GR MWD 8 API 4 1 RPX MWD 8 OHMM 4 1 RPS MWD 8 OPIMM 4 1 RPM MWD 8 OHMM 4 1 RPD MWD 8 OHMM 4 1 ROP MWD 8 FT/H 4 1 FET MWD 8 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max DEPT 12071 12713 GR 16.53 120.48 RPX 4.64 26.65 RPS 5.26 36 RPM 5.06 78.93 RPD 6.3 67.52 ROP 0 410 FET 0.4749 21.2331 First Last Mean Nsam Reading Reading 12392 1285 12071 12713 51.6215 1204 12071 12672.5 13.798 1204 12078 12679.5 18.1995 1204 12078 12679.5 20.2895 1204 12078 12679.5 21.5627 1204 12078 12679.5 49.6274 1205 12111 12713 2.52495 1204 12078 12679.5 First Reading For Entire File .......... 12071 Last Reading For Entire File ........... 12713 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10369 0 10373 5 10373 5 10373 5 10373 5 10373 5 SURFACE SOFTWARE V-ERS ION: 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : STOP DEPTH- 10891.0 10895.5 10895.5 10895.5 10895.5 10895.5 29-DEC-98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 10930.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 10325.0 10930.0 69.8 92.0 TOOL NUMBER 1168GR4 1168GR4 6.000 6.0 QUIKDRIL-N 8.70 54.0 9.1 30500 5.3 .140 .076 .110 .220 53.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 4 API 4 1 68 4 2 RPX MAD 4 OHMM 4 1 68 8 3 RPS MAD 4 OHMM 4 1 68 RPM MAD 4 OHMM 4 1 68 RPD MAD 4 OHMM 4 1 68 FET MAD 4 HOUR 4 1 68 12 16 20 24 Name Min Max Mean Nsam DEPT 10369 10895.5 10632.2 1054 GR 8.03 87.3 25.46 1045 RPX 0.48 21.79 10.1649 1045 RPS 0.43 36.99 18.268 1045 RPM 0.44 58.24 26.0769 1045 RPD 0.47 2000 36.6704 1045 FET 18.8595 58.7488 37.7846 1045 First Reading 10369 10369 10373.5 10373.5 10373.5 10373.5 10373.5 Last Reading 10895.5 10891 10895.5 10895.5 10895.5 10895.5 10895.5 First Reading For Entire File .......... 10369 Last Reading For Entire File ........... 10895.5 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF File Header Service name ............. STSLIB.011 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.010 Comment Record FILE HEADER FILE NUMBER: 11 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 M_AD RUN NUMBER: 5 M_AD PASS NTJMBER: FILE SUMMARY VENDOR TOOL CODE STA/~T DEPTH STOP DEPTH GR 10891.5 11465.5 FET 10896.0 RPD 10896.0 RPM 10896.0 RPS 10896.0 RPX 10896.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: 12 UPG 3 DOWN-HOLE SOFTWARE VERS ION: v5.16 DATA TYPE (MEMORY OR REA_L-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 11469.5 11469.5 11469.5 11469.5 11469.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P_AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPEILATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: 30-DEC-98 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 11510.0 10930.0 11510.0 84.4 92.1 TOOL NUMBER Pl130GR4 Pl130GR4 6.000 6.0 QUIKDRIL-N 8.80 56.0 8.8 29500 5.4 .160 .082 .120 .250 58.3 .6 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MAD 5 API 4 1 68 RPX MAD 5 OHMM 4 1 68 RPS MAD 5 OHMM 4 1 68 RPM MAD 5 OHMM 4 1 68 RPD MAD 5 OHMM 4 1 68 FET MAD 5 OHMM 4 1 '68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 Name Min Max Mean Nsam DEPT 10891.5 11469.5 11180.5 1157 GR 9.26 76.88 26.9205 1144 RPX 1.01 22.21 8.77081 1148 RPS 1.1 35.26 14.1994 1148 RPM 1.19 45.02 18.111 1148 RPD 1.25 51.09 21.1829 1148 FET 6.6264 47.3081 19.7136 1148 First Reading 10891.5 10891.5 10896 10896 10896 10896 10896 Last Reading 11469 5 11465 5 11469 5 11469 5 11469 5 11469 5 11469 5 First Reading For Entire File .......... 10891.5 Last Reading For Entire File ........... 11469.5 File Trailer Service name ............. STSLIB.011 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.012 Physical EOF File Header Service name ............. STSLIB.012 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.011 Comment Record FILE HEADER FILE NUMBER: 12 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 6 MAD PASS N-UMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11462 5 11470 0 11470 0 11470 0 11470 0 11470 0 SURFACE SOFTWARE VERSION: 12 UPG 3 DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11895 5 11903 5 11903 5 11903 5 11903 5 11903 5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 01-JAN-99 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 11937.0 11510.0 11937.0 85.9 92.9 TOOL NUMBER Pll30GR4 Pll30GR4 6.000 6.0 QUIKDRIL-N 8.90 58.0 8.5 29500 5.2 MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .150 .090 .110 .250 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 6 API 4 1 68 4 2 RPX MAD 6 OHMM 4 1 68 8 3 RPS MAD 6 OHMM 4 1 68 12 4 RPM MAD 6 OHMM 4 1 68 16 5 RPD MAD 6 OHMM 4 1 68 20 6 FET MAD 6 HOUR 4 1 68 24 7 61.1 First Name Min Max Mean Nsam Reading DEPT 11462.5 11903.5 11683 883 11462.5 GR 10.33 42.61 24.5944 867 11462.5 RPX 2.54 21.79 11.1263 868 11470 RPS 3.33 36.28 19.1022 868 11470 RPM 3.8 44.14 24.4167 868 11470 RPD 3.09 89.97 28.1643 868 11470 FET 3.5155 43.5078 14.5294 868 11470 Last Reading 11903 5 11895 5 11903 5 11903 5 11903 5 11903 5 11903 5 First Reading For Entire File .......... 11462.5 Last Reading For Entire File ........... 11903.5 File Trailer Service name ............. STSLIB.012 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.013 Physical EOF File Header Service name ............. STSLIB.013 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.012 Comment Record PILE HEADER FILE NUMBER: 13 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: MAD RUN NUMBER: MAD PASS NUMBER: FILE SUMMARY .5000 7 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11896.0 12071.5 FET 11904.0 12077.5 RPD 11904.0 12077.5 RPM 11904.0 12077.5 RPS 11904.0 12077.5 RPX 11904.0 12077.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 02 -JAN- 99 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 12110.0 11937.0 12110.0 91.8 93.4 TOOL NUMBER DGR EWR4 $ DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Pll30GR4 Pll30GR4 6.000 6.0 QUIKDRIL-N 8.80 64.0 8.7 29000 5.8 .140 .078 .100 .220 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 7 API 4 1 68 4 2 RPX MAD 7 OHMM 4 1 68 8 3 RPS MAD 7 OHMM 4 1 68 12 4 RPM MAD 7 OHMM 4 1 68 16 5 RPD MAD 7 OHMM 4 1 68 20 6 FET MAD 7 HOUR 4 1 68 24 7 63.3 First Name Min Max Mean Nsam Reading Last Reading DEPT 11896 12077.5 11986.8 364 GR 20.62 135.85 44.4692 352 RPX 4.27 18.47 10.16 348 RPS 5.06 36.63 16.8737 348 RPM 4.89 54.36 25.9888 348 RPD 6.04 259.26 44.5226 348 FET 3.5139 39.9786 13.1425 348 11896 11896 11904 11904 11904 11904 11904 12077 5 12071 5 12077 5 12077 5 12077 5 12077 5 12077 5 First Reading For Entire File .......... 11896 Last Reading For Entire File ........... 12077.5 File Trailer Service name ............. STSLIB.013 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.014 Physical EOF File Header Service name ............. STSLIB.014 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.013 Comment Record FILE HEADER FILE NUMBER: 14 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 8 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12072.0 FET 12078.0 RPD 12078.0 RPM 12078.0 RPS 12078.0 RPX 12078.0 $ LOG HEADER DATA DATE LOGGED: STOP DEPTH 12676.0 12683.0 12683.0 12683.0 12683.0 12683.0 04-JA1~-98 SOFTWARE SURFACE SOFTWARE VERSION: 12 UPG 3 DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MITD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 INSITE VER. 3.2 BUILD DEPII v2.22; EWR-4 MEMORY 12714.0 12110.0 12714.0 88.2 92.2 TOOL NUMBER Pl130GR4 Pl130GR4 6.000 6.0 QUICB[DRIL-N 8.80 66.0 8.7 28000 5.6 .130 .070 .100 · 180 70.5 .6 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MAD 8 API 4 1 68 RPX MAD 8 OHMM 4 1 68 RPS MAD 8 OHMM 4 1 68 RPM MAD 8 OHMM 4 1 68 RPD MAD 8 OHMM 4 1 68 FET MAD 8 HOUR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 Name Min Max Mean DEPT 12072 12683 12377.5 GR 8.03 143.58 51.8848 RPX 4.1 19.75 10.0657 RPS 4.84 32.48 15.2643 RPM 5.82 140.17 19.601 RPD 7.36 109.32 21.1714 FET 2.8014 50.4142 15.7049 Nsam 1223 1209 1211 1211 1211 1211 1211 First Reading 12072 12072 12078 12078 12078 12078 12078 Last Reading 12683 12676 12683 12683 12683 12683 12683 First Reading For Entire File .......... 12072 Last Reading For Entire File ........... 12683 File Trailer Service name ............. STSLIB.014 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/07/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.015 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/07/10 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/07/10 Origin ................... STS Reel Name ................ UNKNOWN Scientific Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File