Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-182
STATE OF ALASKA RECEIVED • AL/AdKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS JAN 2 1 2014 1.Operations Abandon H Repair Well U Plug Perforations a Perforate u Other Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ vi-r— y/2 Z/l4- 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ t 198-182-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 to 50-029-22023-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0047452 0 0 PBU W-12A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): • PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured • 20888 feet Plugs measured 16639 feet true vertical 9049.46 feet Junk measured None feet Effective Depth measured 16639 feet Packer measured See Attachment feet true vertical 8943.18 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 110 20"Conductor 40-150 40-150 0 0 Surface 2989 13-3/8"68#L-80 38-3027 38-2683.42 5020 2260 Intermediate None None None None None None Production 12928 9-5/8"47#NT8OS 37-12965 37-8470.84 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet t V True Vertical depth See Attachment feet c J CANNED i UN I 12.O 14 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 34-13411 34-8724.71 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): RBDIASegi MAY 16 2014 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 72 241 1732 1017 286 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil•2 Gas LJ WDSPLJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC-❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhaysabp.com Printed Name Nita Su u u- • Title Data Coordinator g � Phone 564-4035 Date 1/20/2014 Ut-r slzz/ i 4 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0047452 HES CTO-1.T5" co(i Job Objective: Set CIBP and Add Perfs MIRU -7 day BOP Test- NFT Test-Swab good - SSV not holding - MU WFD MHA- Standby while Well Support rigs up secondary actuated valve. 12/12/2013 ***Continued on WSR 12-13-13 *** T/I/0=210071800/vac Assist CTU (Perforating) SU/PJSM/RU/P I ****Job Cont to 12-14- 12/13/2013 13 WSR*** CTU HES - 1.75" Coil ***Continued from WSR 12-12-13*** Job Objective: Set CIBP and AddPerf Finish rig up BOPs and make up Log/Drift BHA with 3.70" CIBP drift. FP flowline and RIH. Begin bleeding IA to prevent further gas migration and fluid pack well. Tag @ 16,646', 5 min stop- PUH 45 fpm to 16,580.5' stop count Paint Flag (Pink) - PUH 45 fpm to 15,899.7' - 5 min stop count- POOH. BD PDS Memory Tools- MU WFD Setting tool - CIBP - RIH -Tag @ 7830' -worked CT- Detained @ 7804'. Determined hydrates around coil from gas migration, Free Point calculations at-2700'. Call out LRS to pump down IA to thaw while maintaining -2500 psi WHP. LRS MIRU. 12/13/2013 ...Continued on WSR 12-14-13... CTU HES - 1.75" Coil ***Continued from WSR 12-13-13*** Job Objective: CIBP and AddPerf Rig up LRS to the IA and begin pumping pumping 180*crude down IA at 1 bpm to thaw hydrate. Maintaining 500-2700 psi WHP and -10k weight for verification of hydrate breakdown. Periodically cycling pipe between -20 and +30k#. Increase crude rate to 1.5 bpm 190 F down IA. Continue pumping and monitor pressures. 12/14/2013 ...Continued on WSR 12-15-13... CTU HES- 1.75" Coil ***Continued from WSR 12-14-13*** Job Objective: CIBP and AddPerf Continue pumping 180 degree crude down IA at 1.5 bpm in attempt to thaw hydrate. Periodically cycle weight and WHP to remove gas from hydrate breakdown and maintain overbalance. Got coil weight back after 2155 bbl crude pumped. RIH slowly while pumping meth/wtr down backside. Complete pumping 100 bbl meth/wtr down backside. Resume pumping crude down IA @ 1 bpm while pulling coil out of hole from 10148'. Total crude pumped was 2321 bbls. At surface inspect CIBP and Setting tool, find no damage. Change pack-offs. Make up WFT 4 1/2" CIBP and RIH. 12/15/2013 ...Coninued on WSR 12-16-13.... 12/16/2013 *** Job Cont. from 12-15-13 WSR *** Heat Slick 1% kcl in UR tank N#73065 to 128*f CTU HES- 1.75" Coil***Continued from WSR 12-15-13*** Job Objective:Set CIBP and Addperf RIH with CIBP and Tie in at flag, correct depth to 16644.7' MD. Set CIBP at 16635.0,Mid- Element, 16634.5 Top of plug. Tubing leak off of 280psi or 0.2 bbl in 5 min for 1000 psi WHP. POOH. MU/RIH w/2 3/8" PDS carrier w/2.65" drift nozzle . Tag plug @ 16577' (up ctm). Log up from compression to 16480' and make flag/time marker. Log @ 45 fpm to 15000'. POOH, keeping hole full w/water/meth. At surface examine logs for a correction of+55'. Corrected top of CIBP is 16638.6'. Blow Down reel with N2 and rig down CTU. 12/16/2013 ...Continued on WSR 12-17-13... Daily Report of Well Operations ADL0047452 CTU HES - 1.75" Coil ***Continued from WSR 12-17-13*** Job Objective: Set CIBP and Add Perf Rig Down CTU and return to shop. 12/17/2013 ****Job Incomplete, will return to add perforations**** CTU 8- 1.50" Coil Job Objective:Add Perf Move to location. 12/19/2013 ***Job continued on WSR 12-20-2013*** ***Job continued from WSR 12-19-2013*** CTU 8 - 1.50" Coil Job Objective:Add Perf Move to location. AOL MIRU / Function test BOP'S RIH w/Gun run #1 /2.88" Guns-6 spf-60 -deg -2906 PJ HMX Unable to get to CIBP to correct depths keep stacking out we are able to get deep enough to perforate. POOH to pick up logging tools for a coil flag. RIH with PDS logging tools 12/20/2013 ***Job Continued on WSR 12-21-2013*** ***Job continued from WSR 12-202013*** CTU 8 - 1.50" Coil Job Objective: Add Perf. RIH with PDS logging tools for coil flag. Tag CIBP at 16631' , PUH logging at 40 ft/min. Paint flag 16,000' Elec. Mech. 15.960'. POOH. RIH w/Gun run#1 /2.88" Guns-6 spf-60 -deg -2906 PJ HMX 20' Top shot 15900' - 15920' RIH w/Gun run#2 / 2.88" Guns-6 spf-60 -deg -2906 PJ HMX 20' At flag 16029' correct depth to 16012 top shot puh to 15872'top shot. At surface shots confirmed. POOH. 12/21/2013 <<< Job continued on WSR 12-22-2013>>> ***Job continued from WSR 12-21-2013*** CTU 8 - 1.50" Coil Job Objective: Add Perf. RIH w/Gun run#3/2.88" Guns-6 spf-60 - deg -2906 PJ HMX 20'. At flag Elec. counter 16047', Mech 16006', correct to top shot at flag 16012'. PUH to 15848' top shot. Indication gun fired POOH. At surface cut 120' of coil and change pack off elements RIH w/PDS GR CCL logging tools for another tie in log. Depth at flag 16,000' uncorrected, CCL to CTC 9.53, 15990' uncorrected EOP, depth shift +16', Corrected EOP depth at flag 16006.47. MU RIH w/Gun#4 w/WFD MHA 2.375"x 2.32' disc 3/4" ball CBF firing head 2.13" x 3.59' guns 2.88" x 20' OAL= 27.14' 12/22/2013 «< Job continued on WSR 12-23-2013>>> ***Job continued from WSR 12-22-2013*** CTU 8 - 1.50" Coil Job Objective: Add Perf. RIH w/Gun run#4/2.88" Guns-6 spf-60 - deg -2906 PJ HMX 20'. At flag depth 16,000', EOP 9.53' Correlation depth shift+16' corrected EOP 16,006.47 EOP to top shot+6.58'Top shot at flag 16,013.85'. Gun fired POOH.At surface gun fired. MU Gun run#5/2.88" Guns-6 spf-60 -deg -2906 PJ HMX 20'.top shot 15480' - 15500' /Gun run #6/2.88" Guns-6 spf-60 -deg -2906 PJ HMX 20'.top shot. At surface with gun, confirmed holes, 1/2" ball recovered. RDMOL 12/23/2013 ***Job complete*** FLUIDS PUMPED BBLS 699 60/40 METH 230 1% SLICK KCL 10 METH 939 TOTAL Daily Report of Well Operations ADL0047452 FLUIDS PUMPED GALS 381N2 381 TOTAL N M• (O r � co r CD „, lt') IO I- M f- CO O 00 O t 00 CA IO r r N M CO M O (b 00 N M co p_ O O cd N 00 r N N N N- N- N N- 00 00 y LU r O CJ) O CO L Cb 00 Cb IX) 00 Cb Cb M ❑ C) O CT CT CA a) M O CA O CA a) O O O m m m 0 co co OO co 00 00 OO 00 00 OO 00 00 LU 00 00 OO F . —. 0 W 0. 0 p r r M CO O IC) N- CO M Cb (O 00 N - W L r N r L OO N 0) M M M V L) O M LU N O Z N ' r CT CT O CA 00 - 00 00 Cb OO 00 OO M CO O IO ❑ ❑ M O) O M CA O O (b CA CA CA CT CA CA CA CA CO O ❑ J ❑ 00 LU 00 OO OO OD 00 00 Op OO 00 O M OO M MWM F ~ O z < W d N f0 CO L Ln 0 0 0 0 0 00 LU LU N LU N O O IO (D IO O f� N- CO O N CO (O N- 00 CA N V N- r N IC) i� d N a) �Y IO N- O0 Cb 00 00 00 OO 00 CA CT N- LU LU �' 0 IO IO IO IO LU IO LU LU LU L() Cf) U) (O N- N- O r r . . . . . . r r r r r r r r �-- (N E N fU 2 J0_O V N 4- ti p. 1. 12 = p t LU O O O O O 00 00 LU Cb N CU 0 0 LU (O O J . LU LU (0 OO O Cb N V CO CO N- 00 O N M _O Q N N CA V V N- N- 00 00 00 00 00 00 O CA N- N- L() In ❑ V V LO I() LO LC7 LO l() LC) IO L() 101.040 (0 ♦J QN r r r r r r r- r r r r r r r r r r v- 03 03 f0 m 0 2 a) y 0 0 c • N N LL LL LL LL LL d LL LL LL U) U) U) U) r2ooman. amaaam MMMM MMM j cflu) Q < MM < < < M < < < MM MMM Q. 0 0) a • CO M MM M ( M M r CO MMM M = ❑ O O O O O O 0 0 0 0 0 O O O O O O O c O O N N O O N N N N N N N O N N N N = = D (.0 M M c3 M N CN N r r CO (O M CO N IL N N O O CN N CN N N N N O r r r r W o 1• � N N N N N N N N N N N N N W a 0 r r r r r r r r r r T- 0 0 W W m E z Q Q < < < < < < < Q < < < < < < < <C N N N N N N N N N N N N N N N N N N r r r r N r r r r r r i r r r r r r r N Q. LL CD 0. 00000 gs N O CCO O OO LU O N- N N N- U y O o 0 0 0 I- co CO N- N CO m W co co 1.0 co co CO V N • V co V I- o N a) OM V- O r--- coN Oo O CO N- co CA CO N CO H M M O N O Crj 4 co V N co co co CO f� CO CO a co In O I� coO N— O (NI CtSCSICI 4-0 Q ti ti O � co V �) N M M M C - Q 0 (n 0 CO O co CO 0 0 CO .) CO *kZ -P# •(1) N a CO CO o C) - cn U N - _ c V - O I- N Oo coN N in c7 V M Cb CA S O O N • M O C, M • co J N N N C O O IA N > > Q c� C OQ OLLZ U O Z_ Z J co U J JCLCn Packers and SSV's Attachment ADL0047452 SW Name Type MD TVD Depscription W-12A PACKER 12754 8264.16 7" Baker ZXP Packer W-12A PACKER 13335 8604.13 4-1/2" Baker S-3 Perm Packer W-12A PACKER 13416 8643.41 4-1/2" Baker ZXP Packer TFC_• 1/16'FMC SN NOTES: WELL ANGLE-TO° 13752'•' 'V1A3LHEAD= FMC W-1 2 A CEMENT FROM 5/19/07 SQZ RLLED MUCH OF TIE ACTUATOR= BAKER C NTIAL KB.ELEV= 91.0T 1 A WE t F MILLED OUT ON JAN 14&FEB 9. L 1 ALL PERFS POSSIBLY SQED EXCEPT 16775- BF.ELEV= 54.37' KOP= 880' I I 17525'. Max Angle= 98°@14752' 20'CONDUCTOR, —{ 110' Datum ID= 13782' ' ' 216W H4-1/2"FES X NP,D=3.813' Datum TVD= 8800'SS 13-3/8"CSG,6811,L-80 BUTT,D=12.415" H 3029' GAS LIFT 1444NDIa3S Minimum ID =3.80" @ 13399' ST MD TVD DEV TYPE VLV LATCH FORT DATE 4-1/2" HES XN NIPPLE (MILLED) J 7 3873 3198'52 MAG DOME lac 16 02/15/12 6 5965 4409 r 55 MNG DMY RK 0 11/22/98 5 7408 5226'56 MNG SO RK 20 02/15/12 9-5/8'X 7"BKR TIEBACK SLV,D=7.50' —I 12747' 4 8735 5989'54 MAG DMY RK 0 11/22/98 3 10062 6789'52 MAG DMY RK 0 08/12/11 9-5/8"X 7"BKR ZXP R(R — 12760' 2 11390 7597'57 MNG DMY RK 0 08/12/11 w/MAC LIR HGR,D=6.188' 1 12471 8197'59 MMG DMY RK 0 03/22/07 9-5/8"CSG,47#,NT-80S(SCC,D=8.681' H —12905 TOP OF C aENT IN 9-5/8'CSG —I —12905 - PERFORATION SUMMARY 15/8"t�LLOUT WI DOW(W-12A) 12905'- 12965' FEF LOG:ANACRLL ME RE51STIV1TY ON 10/04/98 ANGLE AT TOP PBT:82'@ 15460' \.\900. Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL C n/Sgz SHOT 1 SQZ W-12A ' • 13344' H 4-12"HES X NP,D=3.813" 2-7/8" 4 '14255-14275 0/C? 05/05/02 05/13/07 2-7/8" 4 '14950- 14970 0/C? 05/05/02 05/13/07 2-7/8" 6 15460-154.80 0 12/23/13 E X 13355' 1--{7'X4-1R"BKR S-3 PKR,D=3.875' 2-7/8' 6 15480-15500 0 12/23/13 2-7/8' 4 '15700-15740 CLC? 05/04/02 05/13/07 / 13379' —4-1/2"HES X NE.D=3.813' 2-7/8' 4 '15780- 15820 0/C? 05/03/02 05/13/07 I r 2-7/8" 6 15828-15848 0 12/23/13 2-7/8' 6 15848-15868 0 1282/1313399' —4-1/2"HES XN NP,BLL®TO TO 3.80'(11/24/11) 2-7/8' 4 '15865-15885 0/C? 05/03/02 05/13/07 ' x- 2-7/8" 6 15872-15892 0 12/21/13 2-7/8" 6 15900-15920 0 12/21/13 13410' 7"X 4-1/2'BKR TACK SLV,D=5.25" 2-7/8' 4 '15920- 15940 0/C? 0429/02 05/13/07 13411' 4 18'WDL6G, =3.956' 2-3/4' 4 '16734-17516 CVC? 11/17/98 05/13/07 H 2-7/8" 6 16775-17525 0 01/10/12 13423' —ELM)TT LOGGED 07/30/99 2-314" 4 19550-20450 0/C? 11/17/98 05/13/07 / ' 13416' HT X 5"BKR ZXP LTP w/FIGR,1)=4.458" •SEE SAFE/Y NOTE FOR DETALS 4-1/2'TBG,12.6#,L-80,.0152 bpf,ID=3.958" H 13411' 14574' H4-1/2"INARFCI32 JT 7"LIR,2611,L-8O,MOD BUTT, —I 13577' 1--1 15609' H4-1/2"MARKER-IT .0383 bpf,D=6.276" 1 3.80"MLLOUT WIDOW(W-12A L1) 16764'-16774' I BKR 45 KB I N-F�STOCK PACKER 16764' 16636 �4 1/2'C8P(12/16/13) V. w/REVERSE FLOW VALVE(1/13/12) I _ 1D(01/07/12) 19094' F 1 +f 16765'-17091' 3.75"LATERAL(OPEN HOLE) 4-18'LNTZ 12.64,L-80 NSCT,.0152 bpf,13=3.958" 20888' 111` DATE REV BY CX) LENTS DATE REV BY COMMITS PRUDHOE BAY UNIT 05/06190 AIDC 93 ORIGINAL COMPLETION 04/28/12 MJF/PJC Ft4AL DRLG CORRECTIONS KEEL W-12A 11/20/98 N18E SIDETRACK NABORS 18E 01/06/14 JGUJMD SET CRBP/ADFERFS(12/16-23/13 FER.4T No: 1981820(2111180) 01/20/12 NORDIC 21CTD MULTILAT(W-12A L1) AR No: 50-029-22023-01(60) 01/26/12' CAD DRLG HO CORRECTIONS SEC 21,T11 N,R12E, 1547 FM.8 1196'FEL 03/03/12 PJC DRLG DRAFT CORRECTIONS 03/04/12 PJC DRAWING CORRECTIONS 1. BP Exploration(Alaska) • STATE OF ALASKA RECEIVED . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS FEB 117 2012 1. Operations Performed: `,1 ask CAI & G'a3 Cons. Commission ❑ Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑Re -Enter SuspendedlygeAge ❑ Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Other - - - - - - -- ❑ Change Approved Program ❑ Operation Shutdown ■1 Perforate ❑ Time Extension Mill Up Old Cement Job 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ® Development ❑ Exploratory " 198 - 182 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 ' 50 - 029 - 22023 - 01 - 00 7. Property Designation: 8. Well Name and Number: ADL 028263 & 047452 PBU W - 12A C 64-A 9. Field / Pool(s): Prudhoe Bay / Prudhoe Bay 10. Present well condition summary Total depth: measured 20888' feet Plugs (measured) 16764' feet true vertical 9049' feet Junk (measured) None feet Effective depth: measured 19094' feet Packer: (measured) 13355' feet true vertical 8984' feet Packer: (true vertical) 8698' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' Surface 2989' 13 -3/8" 3029' 2685' 4930 2270 Intermediate 12869' 9 -5/8" 12905' 8434' 6870 4760 Production Liner 830' 7" 12747' - 13577' 8344' - 8802' 7240 5410 Liner 7478' 4 -1/2" 13410' - 20888' 8724' - 9049' 8430 7500 Perforation Depth: Measured Depth: 16775' - 17525' True Vertical Depth: 8932' - 8978' Tubing (size, grade, measured and true vertical depth): 4 - 1/2 ", 12.6# L 13411' 8725' Packers and SSSV (type, measured and true vertical depth): 7" x 4 -1/2" Baker 'S -3' packer 13355' 8698' 11. Stimulation or cement squeeze summary: Intervals treated (measured): S `' FEB , 4 L iS Treatment description including volumes used and final pressure: Drill out cement in well to a depth of 19,094'. Re -pert well (all prior perfs were previously squeezed off with cement). Set retrievable whipstock at -16,764'. (End of operations for this wellbore, see 10 -407 for W -12AL1 for continuation of operations.) CC, I 4_6j 40. r`d 4 tc -r,--, z,/2 2 3 /�L L- 12. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 13. Attachments: ❑Copies of Logs and Surveys run 14. Well Class after work: ❑ Exploratory Development ❑ Service ❑ Stratigraphic ® Daily Report of Well Operations ® Well Schematic Diagram 15. Well Status after work: ❑ GINJ 4 ® Oil ❑ SUSP ❑ WDSPL ❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Matt Ross, 564 -5782 N/A Printed Name Terrie Hubble Title Drilling Technologist Prepared By Name /Number: Signature -W 1 • Z � t 0 / Phone 564 - 4628 Date 1 4`Terrie Hubble, 564 - 4628 Form 10-404 Revised 10/2011 0/201 - • M FEB 21 Z012 y -Y / L Original Only 1 �_ � • . W -12A, Well History (Pre Rig to Add Lateral) Date Summary 11/20/11 WELL S/I ON ARRIVAL. RAN 3.70" CENT X 3' -1 7/8" X 3.80" CENT BAR BELL TO 13,386' SLM, SET DOWN @ 11, 566' SLM & 11, 650' SLM. WELL LEFT S/I ON DEPARTURE * ** PAD -OP NOTIFIED. 11/22/11 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O = 1450/400/0 PSI. PT DOES NOT PASS DUE TO O'RING DEFORMATION RELATED TO COLD TEMPERATURES. WOULD RUN OUT OF TIME ON 16HR RULE TO CONTINUE JOB. LAY DOWN TOOLS AND EQUIPMENT AND JOB WILL CONTINUE TOMORROW. FINAL T /I /O = 1450/400/0 PSI. WELL SHUT -IN UPON DEPARTURE. 11/23/11 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O = 1450/400/0 PSI. RIG UP AND WELLTEC HAD TO TROUBLESHOOT CCL. GOT PASSING LOW /HIGH PT WITH APPLYING 2ND HEATER TO LUBRICATOR. RIH AND SET DOWN AT 12571', HAD TO TURN ON MILL AND MILL THROUGH. REACH XN NIP AND MAKE MULTIPLE ATTEMPTS TO MILL XN NIP AT 13399', KEPT SITTING DOWN. CONTINUE MILLING. 11/24/11 XN @13339' APPEARS TO BE MILLED OUT, BUT KEPT SETTING BACK DOWN ON NIPPLE AND ABLE TO WORK THRU EACH TIME (POSSIBLY SETTING DOWN DUE TO ASPHALTINES). DECISION MADE TO PULL OUT OF HOLE AND RIG DOWN BUT WHILE PULLING OUT OF HOLE TOOL STUCK IN TIGHT SPOT @ 12571'. LRS PUMPED 28 BBLS CRUDE AWAY UNTIL WELLHEAD PRESSURE REACHED 3000 PSI. TOOL CAME FREE. NO CONCLUSIVE MARKS ON TOOL, STROKE MANDREL PACKED WITH ASPHALTINES. MILLING BIT FINAL O.D. 3.800 TO 3.801. FINAL T /I /O 1550/400/0. JOB COMPLETE, WELL LEFT SI UPON DEPARTURE. 11/29/11 T /I /O =SSV /400/10. Temp =SI. Bleed IAP & OAP to 0 psi (CTD prep). AL SI @ casing valve, ALP =1220 psi. IA FL =100'. OA FL @ surface. Bled OAP from 10 psi to 0 psi in 30 minutes. Bled IAP from 400 psi to 0+ in 2 hrs (all gas) and held open bleed for an additional hour. Monitored for 30 minutes. During monitor IAP increased to 6 psi. Job complete. FWHPs = SSV /6/0. 12/13/11 T /I /O= 1450/170/0. Temp= SI. WHPs & TBG FL (CTD Prep). ALP= 1220 psi SI @ casing valve. TBG FL @ 1520', (23 bbls). 12/14/11 T /I /O= 1450/170/0. Temp= SI. Bleed T IA OA (CTD Prep). ALP= 1220 psi SI @ casing valve. Initial TBG FL @ 1520' (23 bbls) & IA FL @ 126'. Bled TBG to production from 1450 psi to 450 psi in 2 hrs. TBG FL inflowed to 300'. SI wing valve & continued bleeding TBG pressure to UR tank from 450 psi to 50 psi in 3 hrs. SI monitor for 30 min. TBG pressure increased 130 psi & TBG FL decreased to 2640'. Bled IAP to slop trailer from 170 psi to 0 psi in 3 hrs. Continue holding open bleed on IA during TBG bleed. SI monitor for 30 min. IAP unchanged. OAP unchanged. Final WHPs= 180/0/0 12/14/11 T /I/0= 1400/180/20 Conducted PJSM; P.T. lubricator /tested down on SN (Charted) to 1700 Psi /5000 psi (passed); Set 4" CIW "H" TWC #278 @ 118" w/1 -1' ext,; Torqued tree to Specifiction (see log); P.T. tree (charted) to 300 psi /5000 psi (passed); Pulled 4" CIW "H" TWC #278 @ 118 "; Pre Nordic 2 12/15/11 T /I /0= 160/60/40 Temp =S1 Injectivity Test (CTD Prep) Pumped 3 bbls neat meth followed by 93 bbls diesel down Tbg to establish injectivity. Tbg pressured up. Unable to maintain injectivity. Bleed Tbg pressure down to 0 psi. Monitor Tbg pressure for 5 minutes. Tbg pressure stayed @ 0 psi. After RD Tbg pressure was 65 psi. FWHP= 65/20/40. 12/17/11 T /I /O= NA/40/0. Temp =SI. WHPs (CTD Prep). Well disconnect in progress. Tie -in crew disconnect in progress, unable to verify valve positions. 12/18/11 T /I /O = TWC /60/0. Temp = SI. Bleed IAP & OAP to 0 psi (Pre CTD). No wellhouse, flowline, AL or scaffolding. IA FL @ 126' (7 bbls). Bled IAP from 60 psi to 0 psi (gas, to BT) in 2 hours. Monitor for 30 min. IAP increased to 0+ psi. FWHP's = TWC /0 + /0. Job Complete. 12/18/11 T /I /O= 580/50/50 Conducted PJSM; P.T. (charted) lubricator to 300 psi /3500 psi; Set 4" CIW TWC #256 w /1 -1' ext. @ 118 "; Shell tested tree (charted) to 900 psi /4200 psi (passed); Pre Nordic 2 12/20/11 T /I /O = TWC /24/0. Temp = SI. WHPs (Post IA & OA bleed). No wellhouse, flowline, AL or scaffolding. IAP increased 24 psi since 18 Dec 11 monitor. 12/21/11 T /I /O = SSV /35/0. Temp =SI. WHPs (Post IA and OA bleed). No well house, FL, AL, or scaffolding. IAP increased 11 psiu since 12/21/2011. Page 1 of 1 • • Common Well Name: W -12 i AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: IX3- O0XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/22/2011 00:00 - 04:15 4.25 MOB P PRE PJSM, REVIEW RIG MOVE CHECKLIST- PREP RIG FOR MOVE. MOVE CUTTINGS BOX AND TIGER TANK. WARM UP MOVE SYSTEM. PREP OUTSIDE EQUIPMENT. OPERATE RIG JACKS, RAM SEAL WEEPING HYDRAULIC FLUID ON RIGHT REAR JACK DUE TO -30 DEG AMBIENT TEMP. PLACE TRUNK HEATERS ON JACKING SYSTEM TO WARMUP, ROTATE WHEELS. 04:15 - 04:30 0.25 MOB P PRE PJSM WITH CREW, TP, WSL AND NORDIC FIELD SUPERINTENDANT. REVIEW SOP FOR PULLING OFF WELL AND ROUTE INSPECTION. 04:30 - 05:30 1.00 MOB P PRE JACKUP RIG, PULL OFF WELL. MOVE RIG DOWN PAD. 05:30 - 07:30 2.00 MOB P PRE REMOVE RIG MATS FROM AROUND W -21. 07:30 - 11:00 3.50 MOB P PRE SPOT MATS AT ANGLE AROUND W -12 WELLHEAD: MOVE RIG OVER WELL. SET DOWN ON MATS. ACCEPT RIG AT 1100 HRS ON 12/22/11. 11:00 - 15:00 4.00 MOB P PRE - IkIG UP SUPPORT EQUIPMENT. MOVE SAT CAMP AT SPOT NEAR RIG. CALL FOR DSM TO MOVE AND RIG UP FLOW BACK EQUIPMENT. 15:00 - 17:00 2.00 BOPSUR P PRE REMOVE TREE CAP. NU BOPS. CONTINUE TO SPOT AND STAGE EQUIPMENT. 17:00 - 18:00 1.00 BOPSUR P PRE HOLD PJSM. LIFT REEL FROM FLAT BED IN TO REEL HOUSE. CONDUCT AAR FOR REEL INSTALL. GOOD COMMUNICATION, LOCATION SECURE PRIOR TO LIFT. 18:00 - 18:30 0.50 BOPSUR P PRE CREW C/O. DISCUSS ONGOING RIG OPS. CHECK EQUIPMENT STATUS. 18:30 - 20:00 1.50 BOPSUR P PRE PJSM. INSTALL HARDLINE IN REEL. SECURE CELLAR- BERM AROUND CELLAR. SPOT SUPPORT EQUIPMENT AROUND RIG. LOAD PITS WITH 580 BBLS 8.4 PPG 2 %KCL. 20:00 - 20:30 0.50 BOPSUB P PRE PJSM WITH SCAFFOLD CREW, REMOVE SCAFFOLD AROUND MGS AND LOAD OUT. 20:30 - 22:15 1.75 BOPSUR P PRE PJSM WITH HARDLINE CREW, R/U HARDLINE TO TIGER TANK. PRESSURE TEST HARDLINE TO 4000 PSI WITH DIESEL. PJSM WITH GREASE CREW- SERVICED TREE VALVES. OPEN SSV AND INSTALL FUSABLE CAP. 22:15 - 22:30 0.25 BOPSUR P PRE PJSM, FUNCTION TEST BOPE FROM ALL STATIONS. Printed 2/6 /2012 8:10:35AM m Common Well Name: W -12 I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA 1 UWI: 500292202300 _ Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 BOPSUR P PRE PJSM, REVIEW SOP FOR TESTING BOPE. AOGCC INSPECTOR BOB NOBLE WAIVED WITNESS FOR BOP TEST. TOUR PUSHER AND WSL WITNESS BOP TEST. WITH MASTER AND SWAB VALVE CLOSED - SHELL TEST BOPE TO 250/3500 PSI. TESTING BLIND SHEAR RAMS - TROUBLESHOOT PRESSURE BLEED OFF. 12/23/2011 00:00 - 01:30 1.50 BOPSUR N RREP PRE TROUBLESHOOT PRESSURE BLEED OFF ON BLIND SHEAR RAMS. PJSM, LOTO KOOMEY. OPEN BOP AND INSPECT BLIND SHEAR RAM. FOUND CUT, BLADE SEAL. C/O BLADE SEAL, RE- INTALL RAM. 01:30 - 05:30 4.00 BOPSUR P PRE CONTINUE WITH BOPE TEST. SHELL TEST BOPE TO 250/4500 PSI. RE -TEST BLIND SHEAR RAMS. CONTINUE TESTING BOPE COMPONENTS, CHOKE MANIFOLD, SAFETY VALVES TO 250/3500 PSI FOR 5 MIN EACH. TEST ANNULAR TO 250 AND 2500 PSI - 5 MIN EACH. CHART RECORD TESTS. PERFORM ACCUMULATOR DRAWDOWN TEST. 05:30 - 06:00 0.50 BOPSUR P PRE CONDUCT RIG EVACUATION DRILL. HOLD AAR. DISCUSS KNOWING PAD OPERATOR C/O TIME. WIND DIRECTION. ALWAYS LOOK AT THE WIND SOCK EVACUATE UP -WIND. 06:00 - 06:30 0.50 BOPSUR P PRE CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE EQUIPMENT _ CHECKS AND OUTSIDE ROUNDS. 06:30 - 09:15 2.75 RIGU P PRE PREP TO CIRCULATE REEL WITH MEOH AND KCL WATER. RU TUGGER. PULL AND STAB COIL INTO INJECTOR. RD. 09:15 - 09:45 0.50 RIGU P PRE HOLD RIG EVACUATION DRILL. MUSTER TO SAT CAMP WITH 5 SCBA'S AAR: FUELER MUSTERED TO MAN CAMP. TWO HANDS DID NOT RECOGNIZE ALARM TYPE. ADDITIONAL DISCUSSION. 09:45 - 12:00 2.25 RIGU P PRE PREP AND MU CONNECTOR ON COIL. 12:00 - 15:00 3.00 RIGU P PRE FILL REEL WITH 5 BBL MEOH AND 2% KCL WATER AT 1.0 BPM AT 200 -350 PSI. MAKE 2ND CIRCULATION AT 3.0 BPM. 15:00 - 15:30 0.50 BOPSUR P PRE PRESSURE TEST INNER REEL VALVE AND PACKOFFS. 250 PSI AND 5000 PSI. CHART SAME. 15:30 - 16:00 0.50 BOPSUR P PRE MU AND PT INTEQ CHECK VALVES. 16:00 - 18:00 2.00 BOPSUR P PRE PU DSM LUBRICATOR. TO RIG FLOOR. HOLD PJSM. RU LUBRICATOR. PT SAME AND CHART. 18:00 - 18:30 0.50 BOPSUR P PRE CREW C/O. DISCUSS ONGOING RIG OPS. CHECK EQUIPMENT STATUS. Printed 2/6/2012 8:10:35AM r g t r ? ' 4 ' 4 W ° 4 4.00 ; ; i 0 S f ocitt4 4 4 0,4 00 0 ,:iiag* al i Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 11 End Date: X3 0OXXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA 1 UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:30 1.00 BOPSUR P PRE PJSM WITH DSM. CONTINUE TO TEST LUBRICATOR AGAINST MASTER VALVE AND SSV TO- 250/3500 PSI. CHART RECORD TEST. OPEN SSV AND MASTER. PULL TWC VALVE. WHP= 575 PSI. NOTIFY WTL AND FIELD SUPERINTENDANT. - DISCUSS PLAN FORWARD FOR WELL KILL- DUE TO NO INJECTIVITY RATE. 19:30 - 23:00 3.50 BOPSUR P PRE CLOSE SSV AND MASTER VALVE. PRESSURE TEST AGAINST MASTER VALVE AND SSV 250/3500 PSI. R/D LUBRICATOR AND TOOLS. CLOSE SWAB VALVE, OPEN SSV. INSTALL FUSABLE CAP. 23:00 - 23:15 0.25 BOPSUR P PRE PJSM FOR M/U NOZZLE BHA, REVIEW PLAN FORWARD FOR RIH TO KILL WELL. DISCUSS ROLES, FLUID AND TANK MONITORING. 23:15 - 00:00 0.75 BOPSUR P ORE PUMP 5 BBLS 50/50 METHONAL IN COIL. M/U BHA # 1, 3" NOZZLE, 5' STINGER, XO, 3" _LQC BLIND, UQC, XO, CTC. !WU INJECTOR. TEST QTS. EQUALIZE TO _WHP AT 575 PSI. WITH CHOKE SHUT IN. OPEN SWAB AND MASTER VALVE. PVT= 448 BBLS. 12/24/2011 00:00 - 04:20 4.33 BOPSUR P PRE RIH WITH BHA # 1, 90 FPM, PUMPING .15 BPM HOLDING 900 PSI BACK PRESSURE WITH HAND CHOKE. TAKING RETURNS TROUGH OUT MM TO TIGER TANK . SLIGHT GAS RETURNS BUT FADED. STOP EVERY 1000', SHUT IN CHOKE WITH PUMP OFF AND - STRAP TIGER TANK VOLUME TO ENSURE CORRECT COIL DISPLACEMENT. AT 15,000' P/U WT= 53K. S/O WT= 16K. RIH TO 15,650'. 04:20 - 06:00 1.67 BOPSUR P PRE DISPLACE WELL TO 8.4 PPG 2% KCL, KILL WELL. HOLD 850 PSI BACK PRESSURE WITH HAND CHOKE - TAKING RETURNS THROUGH OUT MM TO TIGER TANK. WITH 130 BBLS PUMPED - OUT MICRO MOTION ACTING ERRATIC AND FINALLY FAILING. MONITOR TIGER TANK. NOTIFY FIELD SUPERINTENDANT- APPROVAL TO CONTINUE WITH DISPLACEMENT. PUMP 165 BBLS. BLEED OFF PRESSURE . SHUT IN CHOKE MONITOR FOR WHP. 25 PSI. CLEAR OUT MICRO MOTION, OPERATIONAL. Printed 2/6/2012 8:10:35AM e -1 4 eic 4v470.04 Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM I Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 ©91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 06:40 0.67 BOPSUR P PRE CREW C/O DISCUSS. OPERATIONS. CHECK RIG EQUIPMENT. CONTINUE DISPLACING WELL TAKING RETURNS TO TT. HOLDING 800 PSI WHP WITH HAND CHOKE. PUMP 237 BBLS TOTAL. SHUT DOWN PUMP. BLOW DOWN FLOWBACK LINE. 06:40 - 06:55 0.25 BOPSUR P PRE - FLOWCHECK WELL FOR 15 MIN. STATIC. 06:55 - 10:30 3.58 BOPSUR P PRE POH WITH NOZZLE BHA. MONITOR HOLE FILL AND FLUID RTNS. LIMIT PULLING SPPED. HOLD PJSM TO DISCUSS IMPORTANCE OF MONITORING HOLE FILL. HOLD PJSM TO DISCUSS FLOW CHECK BHA, AND HANDLING INJECTOR WHEN NEAR SURFACE. 10:30 - 11:00 0.50 BOPSUR P PRE FLOW CHECK WELL. HOLE STABLE. 11:00 - 12 :00 1.00 STWHIP P WEXIT GET OFF WELL. UNSTAB COIL. LD NOZZLE BHA. 12:00 - 16:00 4.00 STWHIP P WEXIT RU TO PUMP SLACK FORWARD. CIRC AT 3.1 BPM AT 3950 PSI. GET 36' FROM REEL. MAKE SEVERAL ATTEMPTS WITH 2% KCL LOAD PIT 5 WITH FRESH WATER FOR A SECOND TRY. 3.2 BPM AT 4150 PSI. NO IMPROVEMENT. ADD MI POLYMER TO 2% KCL TO GO FOR MORE PUMP RATE. 3.8 BPM AT 4000 PSI. PUMP 490' OF E -LINE FROM REEL. ✓ 16:00 - 18:00 2.00 STWHIP P WEXIT RU TO CIRCULATE 3/4" BALL THROUGH REEL. PULL AND PRESSURE TEST COIL CONNECTOR. LOCATE BALL DROP POSITION. 18:00 - 18:30 0.50 STWHIP P WEXIT CREW CIO, DISCUSS CURRENT RIG OPS. CHECK RIG EQUIPMENT AND RESUME ONGOING FLUID TRANSFERS. 18:30 - 21:15 2.75 STWHIP P WEXIT PUMP 3/4" STEEL BALL AROUND TO DRIFT COIL. PUMPING 2.7 BPM. NO BALL AFTER PUMPING 177 BBLS. SURGE COIL SEVERAL TIMES. PUMP ANOTHER VOLUME. NO BALL HEARD. CHECK TREATING IRON. NO BALL FOUND. ROCK REEL BACK AND FORTH, HEAR BALL MOVING. PUMP AROUND. BALL FOUND WEDGED BETWEEN CTC AND E LINE BOOT. WOULD NOT PASS THROUGH CTC. DECISION MADE TO CUT 1' FT OF COIL AND RE -HEAD. CUT COIL, MN BTT CTC. PULL TEST TO 37K. PT 4000 PSI. 21:15 - 22:30 1.25 STWHIP P WEXIT PJSM, M/U BHA # 2. 3.80" PDC BIT, 31/8" ULTRA XL MTR, XO, DUAL ACT CIRC SUB, HI -LOAD DISC, BOWEN JARS, DBPV, X0,4 JTS 23/8" PH6, XO, CTC. M/U INJECTOR. TEST QTS. Printed 2/6/2012 8:10:35AM Common Well Name: W -12 I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 I End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM , Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 STWHIP P WEXIT RIH 75 FPM PUMPING .5 BPM 250 PSI. START 8.6 PPG POWER VIS MUD DOWNHOLE. 12/25/2011 00:00 - 01:25 1.42 ZONISO P OTHCMP RIH WITH BHA # 2 90 FPM PUMPING 1.5 BPM 1600 PSI PUMPING 8.6 PPG POWER VIS MUD DOWN COIL. 15000' P/U WT 52K. TAG AT 15415' PULL 10K OVER TO PULL OUT. 01:25 - 06:00 4.58 ZONISO P OTHCMP REAM AND CLEAN UP FROM 15,415' PUMPING 2.8 BPM 3200 PSI. 200/300 PSI MOTORWORK. HARDER DRILLING FROM 15,580', ROP= 40/50 FPH. 8.6 PPG POWER VIS AT SURFACE @ 250 BBLS. LOAD PITS WITH REMAINING MUD FROM TRUCKS. 15600' PUMP 10 BBL HI VIS SWEEP. DRILLING TO 15,720' PVT= 308 BBLS. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE . DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO DRILL CEMENT. 06:30 - 09:30 3.00 ZONISO P OTHCMP DRILL CEMENT FROM 15720'. 3600 PSI FS AT 3.12 BPM IN/OUT. 100 PSI _ MTR WORK. IA/OA/PVT: 12 PSI / 24 PSI / 279 BBLS. DRILL TO 16,250'. 09:30 - 10:00 0.50 ZONISO P OTHCMP WIPER TRIP TO 15,400'. 3538 PSI @ 3.16 BPM IN. 10:00 - 13:00 3.00 ZONISO P OTHCMP DRILL CEMENT FROM 16,250 TO 16400'. 3691 PSI AT 3.18 BPM IN. 13:00 - 16:00 3.00 ZONISO P OTHCMP WIPER TRIP TO 13,000'. 3680 PSI AT 3.17 BPM. PVT: 402 BBLS. 16:00 - 18:00 2.00 ZONISO P OTHCMP DRILL CEMENT FROM 16,400' TO 16,500' 3598 PSI FAT 3.12 BPM IN/OUT. 18:00 - 18:30 0.50 ZONISO P OTHCMP CREW CHANGE, NEW CREW FROM DAYS OFF. DISCUSS PAST AND PRESENT OPS FOR W -12. MAKE EQUIPMENT CHECKS. START WIPER TRIP. 18:30 - 19:00 0.50 ZONISO P OTHCMP CONTINUE WIPER TRIP TO 15,400' 3655 PSI AT 3.12 BPM 19:00 - 20:00 1.00 ZONISO P OTHCMP DRILL CEMENT FROM 16,500' TO 16,600' PUMP 10 BBL HI VIS SWEEP PUMPING 3.12 BPM F /S= 3650 PSI.350 PSI MOTOR WORK. PVT= 499 BBLS. I /A= 340 PSL O/A= 24 PSI. WHP= 66 PSI. 20:00 - 21:00 1.00 ZONISO P OTHCMP WIPER TRIP TO 15,400'. PUMPING 3.09 BPM AT 3550 PSI. 21:00 - 22:00 1.00 ZONISO P OTHCMP DRILL CEMENT FROM 16,600' TO 16,700' PUMPING 3.1 BPM 3950 PSI. PUMP 10 BBL HI VIS SWEEP. 22:00 - 00:00 2.00 ZONISO P OTHCMP WIPER TRIP TO 13,000' PUMPING 3 BPM AT 3600 PSI. 12/26/2011 00:00 - 01:00 1.00 ZONISO P OTHCMP FINISH WIPER TRIP FROM 16,700' TO 13,000' Printed 2/6/2012 8:10:35AM Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 ; End Date: X3- 00XXC -C: 1 X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM 1 Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) 01:00 - 02:00 1.00 ZONISO P OTHCMP DRILLING CEMENT FROM 16,700' TO 16,800' PUMP 10 BBL HI VIS SWEEP PUMPING 3.03 AT 4000 PSI. 1 PVT= 439 BBLS. I /A= 403 PSI. O /A= 24 PSI. WHP= 77 PSI. 02:00 - 03:20 1.33 ZONISO P OTHCMP WIPER TRIP TO 15,400'. _ PUMPING 3 BPM AT 3600 PSI. 03:20 - 04:50 1.50 ZONISO P OTHCMP DRILLING CEMENT FROM 16,800' TO 16,900' PUMPING 2.95 BPM AT 3900 PSI. PUMP 10 BBL HI VIS SWEEP. 04:50 - 06:00 1.17 ZONISO P OTHCMP WIPER TO 15,400' PUMPING 2.93 BPM WITH 3700 PSI. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE . DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO CHANGE HIGH PRESSURE FILTER. 06:30 - 07:30 1.00 ZONISO P OTHCMP COMPLETE CLEANING HIGH PRESSURE FILTER. - CHANGE SCREENS ON SHAKER. CONTINUE TO RIH. 07:30 - 09:30 2.00 ZONISO P OTHCMP DRILL CEMENT FROM 16,900 TO 16,955'. _ STALL AT 16,955'. PUMP POP OFF TRIPPED. 09:30 - 10:30 1.00 ZONISO P OTHCMP WIPER TRIP WHILE RESETTING PUMP #2 POP OFF. 10:30 - 13:30 3.00 ZONISO P OTHCMP ATTEMPT TO RESUME MILLING. REPEAT STALLS AT 16,955'. WORK BHA SEVERAL TIMES DRILL TO 16958' 3640 PSI FS AT 2.76 BPM IN/OUT. UNABLE TO MAKE ANY PROGRESS. 13:30 - 18:00 4.50 ZONISO P OTHCMP HOLD TRIP MANAGEMENT PJSM. CIRCULATE OUT OF HOLE. 18:00 - 18:15 0.25 ZONISO P OTHCMP CREW CHANGE. DISCUSS ONGOING RIG OPS. CHECK RIG EQUIPMENT. 18:15 - 18:30 0.25 ZONISO P OTHCMP PERFORM 500' JOG AT SURFACE. 18:30 - 18:40 0.17 ZONISO P OTHCMP FLOW CHECK WELL- STATIC. PJSM FOR BHA. 18:40 - 19:30 0.83 ZONISO P OTHCMP SET BACK INJECTOR, UD BHA # 2. 19:30 - 20:00 0.50 ZONISO C OTHCMP INSPECT BHA, PDC BIT GRADE= 6 / 2 / BT / NS /X /I /CT /PR. NOTIFY ODE, DECISION MADE TO RUN JUNK MILL. 20:00 - 21:00 1.00 ZONISO C OTHCMP M/U BHA # 3, 3.80" 3 -BLADE JUNK MILL, RE -RUN 3 1/8" ULTRA XL MTR, XO, DUAL ACT CIRC SUB, HI -LOAD DISC, BOWEN JARS, DBPV, XO, 4 JTS 2 3/8" PH6, XO, CTC. M/U INJECTOR. TEST QTS. 21:00 - 00:00 3.00 ZONISO C OTHCMP RIH WITH BHA # 3, RIH 80 FPM. PUMPING .26 BPM 1450 PSI. PJSM, PREP MUD PITS FOR NEW 8.63 PPG POWER VIS MUD. START FLUID TRANSFERS FROM INACTIVE PITS. 15,600 P/U WT 42K. INCREASE PUMP TO 2.9 BPM WITH 3700 PSI. 40 FPM. Printed 2/6 /2012 8:10:35AM C ommon Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X 00 XXC - C: �X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM 1 Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/27/2011 00:00 - 00:40 0.67 ZONISO P OTHCMP RIH WITH BHA # 3 PUMPING NEW 8.6 PPG POWER VIS OH. PUMP AT 2.9 BPM WITH 3700 PSI. TAG BOTTOM AT 16,977' CTB MD. 00:40 - 04:00 3.33 ZONISO P OTHCMP MILL CEMENT AND POSSIBLE JUNK FROM 16,977' TO 17,013' TO NO PENETRATION RATE. PUMPING 3 BPM WITH 3650 PSI. COMPLETE MUD SWAP. PVT= 257 BBLS. 04:00 - 04:15 0.25 ZONISO P - OTHCMP P/U OFF BOTTOM. RECORD SPR 1 AND 2 MP. FLOWCHECK WELL. STATIC. 04:15 - 06:00 1.75 ZONISO P ._ OTHCMP POH WITH BHA # 3 PUMPING 2.97 BPM WITH 3100 PSI. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE RIG CHECKS AND ROUNDS. CONTINUE TO CIRCULATE OUT OF HOLE. 06:30 - 07:30 1.00 ZONISO P ■ OTHCMP CONTINUE TO PULL OUT OF HOLE. JOG I N HOLE TO CLEAR CUTTINGS. TAG UP. 07:30 - 08:15 0.75 ZONISO P OTHCMP FLOW CHECK. GET OFF WELL. UNSTAB COIL. STAND BACK / LD BHA COMPONENTS. MILL SHOWS WEAR FROM CEMENT AND IS NOT JUNK DAMAGED. 08:15 - 09:30 1.25 ZONISO P OTHCMP MU MILLING BHA WITH TO MAX ANTI STALL TOOL AND REBUILD 3.8" HYCALOG PDC BIT. STAB COIL. GET ON WELL. PT QTS. RECORD SAME. 09:30 12:30 3.00 ZONISO OTHCMP RUN IN HOLE. 14K# DN WT 41K# UP WT AT 17,000'. 12:30 14:00 1.50 ZONISO P ■- OTHCMP DRILL FS IN/OUT. FROM 17,005'. ( UNCORRECTED) 3204 3204 PSI SI FS AT 3.03 BPM IN/OUT. DRILL TO 17,112'. 14:00 - 15:00 1.00 ZONISO P OTHCMP WIPER TRIP TO 16,500'. 3200 PSI AT 3.01 BPM IN. P V T: 421 BBLS. 15:00 - 16:15 1.25 ZONISO P OTHCMP DRILLED TO 17,200' 16:15 - 17:00 0.75 ZONISO P OTHCMP WIPER TRIP 16000' 17:00 - 18:45 1.75 ZONISO P OTHCMP DRILLED AHEAD TO 17296' 18:45 - 20:00 1.25 ZONISO P OTHCMP WIPER TRIP TO 16000' 20:00 - 20:45 0.75 ZONISO P -_ OTHCMP DRILLED AHEAD TO 17400' 3550 PSI AT 3.10 BPM PVT OF 431 BBLS. 20:45 00:00 3.25 ZONISO P ■- OTHCMP TRIP 20 OVERPULL VERPULL LL OFF FF BOTTOM. NOTHING ELSE NOTED DURING WIPER TRIP. 12/28/2011 00:00 - 00:45 0.75 ZONISO P OTHCMP FINISH WIPER TO 13000' 00:45 - 02 :15 1.50 ZONISO P . OTHCMP DRILLED AHEAD TO 175751' 3739 PSI AT 3.13 BPM PVT OF 420 BBLS. 02:15 - 02:45 0.50 ZONISO P OTHCMP WIPER TO 16,000' 02:45 - 03:45 1.00 ZONISO P -_ OTHCMP DRILLED AHEAD TO 17605' 3746 PSI AT 2.98 BPM PVT OF 420 BBLS. 03:45 - 04:45 1.00 ZONISO P OTHCMP WIPER TO 16,000' 04:45 - 05:45 1.00 ZONISO P -_ OTHCMP DRILL AHEAD TO 17672 3823 PSI AT 3.02 BPM AND PVT OF 401 BBLS. 05:45 - 06:00 0.25 ZONISO P OTHCMP WIPER TO 16000' WHILE CHANGING OUT. Printed 2/6/2012 8:10:35AM . Cam Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: ,X3- 00XXC -C: 1 X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft) 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. REVIEW CURRENT OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE WIPER TRIP. 06:30 - 07:30 1.00 ZONISO P OTHCMP CIRCULATE BACK IN HOLE. j 3409 PSI AT 3.00 BPM. PVT: 403 BBLS. IA/OA: 443 PSI / 161 PSI. - DRILL TO 17680'. UNABLE TO MAKE ADDITIONAL PROGRESS DUE TO WT TRANSFER UNABLE TO KEEP COIL SLIDING TO MAINTAIN MOTOR WORK. 1 07:30 - 11:00 3.50 ZONISO P OTHCMP MAKE WIPER TRIP TO 13,000'. ■® 3305 PSI FS AT 3.05 BPM. 40 FPM UP, 50 FPM DN RNG SPEED. 11:00 - 13:30 2.50 ZONISO P OTHCMP DRILL CEMENT FROM 17,680'. 3410 PSI FS AT 2.99 BPM IN/OUT. 300 -400 PSI MOTOR WORK. DRILL TO 17,758'. UNABLE TO KEEP COIL SLIDING WITH MOTOR WORK. DRILL TO 17844'. AOGCC GIVEN 24 HR UPDATE OF BOPE TEST. BOB NOBLE WAIVED WITNESS BUT WANTS A 2 HR UPDATE. 13:30 - 14:30 1.00 ZONISO P -_ OTHCMP WIPER TRIP. 1000'. 3450 PSI AT 3.01 BPM . 14:30 - 16:00 1.50 ZONISO P ■ OTHCMP DRILL CEMENT FROM 17,844'. 3510 PSI FS AT 3.05 BPM IN/OUT. DRILL TO 18,000'. 16:00 - 17:15 1.25 ZONISO P - OTHCMP WIPER TRIP. 1000'. 3702 PSI AT 3.04 BPM IN. 17:15 - 19:30 2.25 ZONISO P OTHCMP DRILL CEMENT FROM 18,000'. ■ 3740 PSI FS AT 3.05 BPM IN/OUT. 400 PSI MTR WORK. 19:30 - 20:00 0.50 ZONISO P -_ OTHCMP WIPER TRIP. 1000' 3700 PSI AT 3.04 BPM 20:00 - 20:45 0.75 ZONISO P -_ OTHCMP DRILL CEMENT FROM 18150' 3937 PSI AT 3.15 BPM 20:45 - 00:00 3.25 ZONISO P -_ OTHCMP WIPER TRIP TO 13,000' 3593 PSI AT 3.11 BPM 12/29/2011 00:00 - 01:30 1.50 ZONISO P OTHCMP CONTINUE WITH WIPER TO 13000' OBTAIN SPR'S PUMP #1 - 0.5 BPM AT 1675 PSI, AND 1.0 BPM AT 1996 PSI, PUMP #2 - 0.5 BPM AT 1670 PSI, AND 1.0 BPM AT 2000 PSI. 01:30 - 04:30 3.00 ZONISO P OTHCMP DRILL AHEAD FROM 18,179' to 18,217' 3893 PSI AT 3.10 BPM 800 PSI MOTOR WORK. 375 BBLS PVT. DRILLING IS SLOW AT -22' PER HOUR. 04:30 - 06:00 1.50 ZONISO P -_ OTHCMP POOH FOR AGITATOR AND BOPE TEST. 3450 PSI AT 3.15 BPM. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND ALL ROUNDS. CONTINUE TO CIRCULATE OUT OF HOLE. 06:30 - 09:00 2.50 ZONISO P OTHCMP CIRCULATE OUT OF HOLE. 3380 PSI AT 3.13 BPM IN AT 9600' HOLD PJSM TO DISCUSS GETTING OFF WELL. Printed 2/6/2012 8:10:35AM «„-c rem'. Common Well Name: W -12 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: 1X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM 1 Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ ■ (ft) 09:00 - 09:30 0.50 ZONISO P OTHCMP JOG IN HOLE 300'. OBSERVE INCREASE IN CUTTINGS. FLOW CHECK. 09:30 - 10:00 0.50 ZONISO P OTHCMP GET OFF WELL. UNSTAB COIL. LD BHA TOOLS. BIT HAD DAMAGE TO GAUGE CUTTERS. 1 -3 -1. CIRC SUB HAD SHEARED OPEN. LIKELY - CAUSE FOR REDUCED ROP. 10:00 - 15:00 5.00 BOPSUR P OTHCMV PERFORM WEEKLY PRESSURE TEST OF BOPE. TEST WITNESS WAIVED BY J. CRISP WITH AOGCC. TEST GAS ALARMS. CLOSE AND TEST MASTER AND SWAB. OPEN ALL RAM CAVITIES. CLEAN AND INSPECT. A' LOT OF METAL FILINGS FOUND IN CAVITIES. 15:00 - 22:00 7.00 BOPSUR P OTHCMP CONTINUE PRESSURE TESTING BOPE. TEST ALL BOPE EQUIPMENT TO AOGCC AND t y e BP STANDARDS. BOB NOBLE WAIVED WITNESS FOR AOGCC. TEST WITNESSED BY BP WSL AND NORDIC TOOL PUSHER. 22:00 - 00:00 2.00 ZONISO P OTHCMP MAKE UP BHA TEST ANTI STALL TOOL TO 1700 PSI AD 75 FT /LBS TQ TO ACTIVATE 1 CM. STAB INJECTOR AND TEST QTS. 12/30/2011 00:00 - 06:00 6.00 ZONISO P OTHCMP RIH WITH DRILLING BHA. TEST ER TOOL WITH 3 BPM AND SLIGHT VIBRATION AT INJECTOR. 100' PER MIN. RATE OF .44 BPM AND 1201 PSI. TAG UP AT 17803', 17831', 17875' AND WORK THRU. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE ROUNDS INSIDE AND OUTSIDE. CONTINUE TO WORK TO BTM. 06:30 - 08:00 1.50 ZONISO P OTHCMP CONTINUE TO WORK TO BTM. 3210 PSI FS AT 2.60 BPM IN. UNABLE TO WORK PAST 18,026' REPEATED STALLING. NO OVERPULLS NOTES. STALL PRESSURE INDICATES MOTOR IS STRONG. COIL LIFE BECOMMING A FACTOR. 08:00 - 12:00 4.00 ZONISO P OTHCMP CIRCULATE OUT OF HOLE TO CHECK BHA COMPONENTS. 12:00 - 13:00 1.00 ZONISO P OTHCMP AT SURFACE. FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD BHA. BIT GREEN. ALL OTHER COMPONENTS APPEAR OK. 13:00 - 14:30 1.50 ZONISO P OTHCMP DISUSS WITH TOWN. MU 3.75" HYCALOG BIT WITH NEW 2 -7/8" XTREME MTR. REMOVE ER TOOL AND TOMAX ANTI STALL TOOLS. STAB COIL. GET ON WELL. 14:30 - 19:00 4.50 ZONISO P OTHCMP RUN IN HOLE TO 18212' NO PROBLEMS. OBTAIN SPRS OF #1 - 1.5 BPM AT 2235 PSI, 0.5 BPM AT 1510 PSI, #2 - 1.5 BPM AT 2186 PSI, 0.5 BPM AT 1511 PSI. Printed 2/6/2012 8:10:35AM m Common Well Name: W -12 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: 1X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 22:00 3.00 ZONISO P OTHCMP DRILL AHEAD RATE 2.59 BPM AT 3406 PSI. PVT OF 409 BBLS. AVERAGE — 30 FT /HR 21:30 HRS AT 18287' RATE OF 2.63 BPM AT 3490 PSI. 22:00 - 22:30 0.50 ZONISO P OTHCMP WIPER TRIP 1000' 22:30 - 00:00 1.50 ZONISO P OTHCMP DRILL AHEAD AT 2.5 BPM AND 3930 PSI. 12/31/2011 00:00 - 00:45 0.75 ZONISO P OTHCMP DRILL AHEAD TO 18328' 2.5 BPM AT 3930 PSI. 00:45 - 03:00 2.25 ZONISO N STUC 18,328.00 OTHCMP WHEN P/U OFF BOTTOM PULLED 92K WORK PIPE AND SPOKE WITH ODE MATT ROSS. NOTIFIED DAY WSL. WORK PIPE AND BUILD SWEEP. NOTIFY DRILLING SUPERINTENDANT RICH BURNETT. MIX LOW VIS FOLLOWED BY HI-VIS SWEEP. PUMP AROUND AND WORK PIPE AS SWEEPS PASS BIT — NO SUCCESS. 03:00 - 06:00 3.00 ZONISO N STUC 18,328.00 OTHCMP APPLY 500 PSI TO BACK SIDE AND WORK PIPE TO 80K DUMPING PSI. NO SUCCESS, PSI BACK UP TO 500. SLACK OFF PIPE AS DUMPING PSI. P/U TO 85K NO SUCCESS. PSI BACK UP TO 500 PSI. DUMPING PSI AS P/U PIPE P/U TO 90K NO SUCCESS. PRESSURE UP TO 1000 PSI ON BACK SIDE AND REPEAT THE ABOVE WITH NO SUCCESS. PRESSURE UP TO 1578 PSI ATTEMPTING TO GO TO 2000 PSI AND CLOSED CHOKE INJECTING MUD AT 1.88 BPM. SHUT DOWN PUMPS AND SLOWLY BLEED PRESSURE DOWN TO 0 PSI RELAXING WELL. P/U PIPE TO 86K NO SUCCESS. DISCUSSION WITH RICH BURNETT THROUGHOUT OPERATIONS. BRING PUMPS BACK ONLINE AT 1.68 BPM AND 2732 PSI WITH A0.10 BPM LOSS RATE. MIXING 30 BBLS LUBE PILL. 3 DRUMS LUBE TO 30 BBLS 06:00 - 07:15 1.25 ZONISO N STUC 18,328.00 OTHCMP PUMP 10 BBLS LOW VIS FOLLOWED BY 40 BBLS HI-VIS WITH 3 DRUMS OF 776 MIXED IN. PUMP 5 BBLS OF SLICK PILL OUT OF BIT AND SOAK FOR 15 MIN THEN PUMPING 2 TO 3 MORE BBLS AND WAITING UNTIL ALL PILL IS OUT OF BIT. WITH 10 BBLS LEFT IN COIL, CAME FREE. 07:15 - 11:15 4.00 ZONISO P OTHCMP CIRCULATE OUT OF HOLE. HOLD PJSM. FLOW CHECK AT SURFACE. 11:15 - 13:15 2.00 ZONISO P OTHCMP GET OFF WELL. UNSTAB COIL. LD BHA. BIT 1 -1. MU DRILLING BHA WITH AGITATOR AND PORTED SUB. RE -RUN 2 -7/8" XTREM MTR AND 3.75" HYCALOG BIT. STAB COIL. GET ON WELL. PT QUICK CONNECT SUB. FLOW TEST AGITATOR. 13:15 - 17:30 4.25 ZONISO P OTHCMP RUN IN HOLE. 17:30 - 18:00 0.50 ZONISO P OTHCMP OBTAIN PARAMETERS 35k# UP, 16k# DN WT AT 18,000'. CONTINUE TO RIH TO 18332' Printed 2/6/2012 8:10:35AM e o Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 00:00 6.00 ZONISO P OTHCMP DRILL AHEAD AT 18332' PUMP RATE AT 2.78 BPM WITH 4211 PSI. PVT OF 380 BBLS. 21:00 HRS - 18398' RATE OF 2.79 BPM WITH 4076 PSI. PVT OF 386 BBLS 23:00 HRS - 18,453' RATE OF 2.81 BPM WITH `4200 PSI. PVT OF 378 BBLS 00:00 HRS - 18,485' RATE OF 2.77 BPM AND 4120 PSI. PVT OF 375 BBLS. 1/1/2012 00:00 - 00:30 0.50 ZONISO P OTHCMP DRILL AHEAD AT 18485' TO 18,500' PUMP RATE AT 2.77 BPM WITH 4120 PSI. PVT OF 375 BBLS. 00:30 - 01:45 1.25 ZONISO P OTHCMP WIPER TRIP TO 17,500' RATE OF 2.74 BPM WITH 3860 PSI SAND SEEN ON SHAKERS AFTER WIPER TRIP BOTTOMS UP. WHILE RIH S TARTED SEEING LOSSES OF AROUND 0.6 BPM. 01:45 - 05:30 3.75 ZONISO P OTHCMP DRILL AHEAD AT 18,500' TO 18,675' PUMP RATE AT 2.77 BPM WITH 4156 PSI. PVT OF 354 BBLS. LOSS RATE OF 0.5 BPM DROPPING TO 0.1 BPM WHILE DRILLING. 0300 HRS - 18,547' RATE OF 2.73 BPM WITH 4150 PSI. PVT OF 342 BBLS. NO LOSSES. 0400 HRS - 18,600' RATE OF 2.75 BPM WITH 4263 PSI PVT OF 342 BBLS. 0500 HRS - 18,650' RATE OF 2.74 BPM WITH 4230 PSI PVT OF 338 BBLS. 05:30 - 06:00 0.50 ZONISO P OTHCMP WIPER TRIP TO 17,675' RATE OF 2.72 BPM WITH 3970 PSI. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE WIPER TRIP FROM 13,000'. 06:30 - 07:30 1.00 ZONISO P OTHCMP WIPER TRIP TO BOTTOM. 3955 PSI AT 2.63 BPM IN. 40 K# UP, 15K# DN WT. 07:30 - 12:00 4.50 ZONISO P OTHCMP DRILL AHEAD FROM 18,675'. 3820 PSI FS AT 2.53 BPM IN/OUT. 200 -300 PSI MTR WORK. IA/OA/PVT: 438 PSI / 127 PSI / 318 BBLS. SLIGHT MUD LOSSES DURING TRIPS. UNABLE TO MAKE ANY ADDITIONAL FOOTAGE AT 18,794'. MOTOR WORK, WEIGHT TO BIT, WILL NOT DRILL OFF. 12:00 - 17:00 5.00 ZONISO P OTHCMP CIRCULATE OUT OF HOLE. 3585 PSI AT 2.75BPM IN. 17:00 - 19:00 2.00 ZONISO P OTHCMP AT SURFACE. GET OFF WELL. LD BHA.FLOW SUB WASHED OUT. BIT HAD SEVERAL BROKEN CUTTERS. 2-6 -i. M/U NEW BHA 19:00 - 19:45 0.75 ZONISO P OTHCMP N/U INJECTOR HEAD TEST QTS TO 3500 PSI. Printed 2/6/2012 8:10:35AM p • ter Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:45 - 00:00 4.25 ZONISO P OTHCMP RIH TO 18,155' 0.33 BPM WITH 1809 PSI. 1/2/2012 00:00 - 00:30 0.50 ZONISO P OTHCMP RIH FROM 18,155' TO 18,798' RATE OF 2.29 BPM AT 4025 PSI. OBTAIN SPRS #1- 0.5 BPM AT 2200 PSI, 1.0 BPM AT 2575 PSI, #2 - 0.5 BPM AT 2150 PSI AND 1.0 BPM AT 2607 PSI. 00:30 - 06:00 5.50 ZONISO P OTHCMP DRILL AHEAD FROM 18,798' 'RATE OF 2.31 BPM AT 4160 PSI PVT OF 293 BBLS 030- 18,845' RATE OF 2.35 BPM AT 4222 PSI PVT OF 287 BBLS. 0330 - 18,875' RATE OF 2.39 BPM AT 4400 PSI PVT OF 282 BBLS 0445 - 18,894' RATE OF 2.27 BPM AT 3832 OFF BOTTOM. 06:00 06:30 0.50 ZONISO P OTHCMP CREW CHANGE DISCUSS OPERATIONS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. ._. CONTINUE 500' WIPER . 06:30 - 07:00 0.50 ZONISO - P OTHCMP WIPER BACK TO BTM AT 18,904'. - 4076 PSI AT 2.26 BPM. 07:00 - 08:30 1.50 ZONISO P OTHCMP - DRILL CEMENT TO 18938'. - 4008 PSI AT 2.25 BPM IN. 200 -300 PSI MTR WORK. BEGIN LOSING PARTIAL RETURNS AT 18,925'. 2.25 IN/ 1.75 BPM OUT. UNABLE TO MAKE MUCH FOOTAGE. WT TRANSFER GOOD. GOOD MOTOR WORK, BUT WILL NOT DRILL OFF. BIT LIKELY WORN. PJSM IN OPS CAB. 08:30 - 12:30 4.00 ZONISO P OTHCMP CIRCULATE OUT OF HOLE FOR BIT / BHA CHANGE. 3715 PSI AT 2.21 BPM. NOTED MOTOR RUBBER ACROSS SHAKER DURING TRIP. HOLD PJSM NEAR SURFACE. 12:30 - 15:15 2.75 ZONISO P OTHCMP FLOW CHECK. GET OFF WELL. UNSTAB COIL. LD BHA COMPONENTS. BIT IN GOOD CONDITION: 2 -1 -I. MU BTT 3.75" DRAG BIT. REPLACE MOTOR AND COIL CONNECTOR. PLACE ANTI STALL TOOL ABOVE AGITATOR. STAB COIL. GET ON WELL. TEST QT SUB. _ CIRC TEST AGITATOR. 15:15 - 21:15 6.00 ZONISO P OTHCMP RUN IN HOLE. RATE OF 0.5 BPM AT 1956 PSI. Printed 2/6/2012 8:10:35AM Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00) 1 Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) .. 21:15 - 22:45 1.50 ZONISO OTHCMP WHILE RIH AT 10 FPM AT 18888' MOTOR STALLED. NO WT SEEN. P/U TO 60K AND PULLED TIGHT. PUMP PSI INCREASED TO 0.5 BPM AND 3200 PSI INDICATING MOTOR NOT ROTATING. BIT STUCK. WORK PIPE TO 65K RIH AND COCKING JARS AND PULLING 65K. NOTIFACATIONS MADE TO DRILLING SUPER. HOLD NUETRIL WEIGHT AND WORK PUMPS TO TRY AND FREE MOTOR AND BIT WITH NO SUCCESS. RIH COCKING JARS AND PULLING 70K WITH ALL PRESSURE BLEED FROM STRING. NO GO. REPEAT AGAIN AS ABOVE TO 75K, 80K, AND BROKE FREE AT 83K. 22:45 - 00:00 1.25 ZONISO P OTHCMP WIPER TRIP TO 13 RATE OF 2.54 BPM WITH 3567 PSI. 1/3/2012 00:00 - 05:00 5.00 ZONISO P OTHCMP WIPER TRIP TO 13,000' RATE OF 2.54 BPM WITH 3684 PSI. OBTAIN SPRS #1 - 1.0 BPM AT 1952 PSI, 0.5 BPM AT 1516 PSI, #2 - 1.0 BPM AT 1970 PSI, AND 0.5 BPM AT 1505 PSI. SLOW DOWN TO —5 FT/MIN AS RIH. AT 18,886' PRESSURE INCREASED INSTANTLY AND POP OFF BLEW. P/U WITH NO PROBLEMS. LINE UP PUMPS. 05:00 - 06:00 1.00 ZONISO OTHCMP TIME DRILL FROM 18,880' AT 0.5 FT /MIN PUMP RATE OF 2.59 BPM AND 3787 PSI RIH AT 18,880' AT 18,886' MOTOR WORK INCREASED TO 50 PSI AND SLOWLY INCREASED TO 100 PSI.. 06:00 - 06:30 0.50 ZONISO P OTHCMP CREW CHANGE. DISCSUSS OPERATIONS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE TO REAM TO BTM WITH DRAG BIT. 06:30 - 08:30 2.00 ZONISO P OTHCMP CONTINUE TO WORK BIT TO BTM TIME MILLING. 3800 PSI FS AT 2.55 IN. MAKE REPEATED ATTEMPS TO GET BIT TO DRILL AHEAD FROM 18,936'. FREQUENT STALLING. PUMP PRESSURE UP TO 4200 CHILE CIRCULATING, EVEN OFF BTM. NOT SURE WHY. DISCUSS WITH TOWN. 08:30 - 14:45 6.25 ZONISO P ■ - OTHCMP DECIDE TO POOH FOR A DIFFERENT BIT OR MILL. 3790 PSI AT 2.54 BPM IN. 14:45 - 17:45 3.00 ZONISO P OTHCMP UD BHA FOUND BIT WORN OUT. M/U BHA AND GET APPROVAL FROM COMPANY RP. M/U INJECTOR AND TEST. 17:45 - 22:30 4.75 ZONISO P OTHCMP RIH WITH BHA 0.43 BPM AT 1073 PSI. OBTAIN PARAMETERS SPRS. PUMP #1 - 1.0 BPM AT 1648 PSI, 0.5 BPM AT 1198 PSI, #2 - 1.0 BPM AT 1692 PSI, AND 0.5 BPM AT 1250 PSI. RIH WITH 2.62 BPM AT 3472 PSI @ 1.5 FT /MIN 18,882' Printed 2/6/2012 8:10:35AM Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) 22:30 - 00:00 1.50 ZONISO P OTHCMP REAM OPEN FROM 18,882' RATE OF 2.62 BPM WITH 3571 PSI -100 PSI MOTOR WORK PVT 360 BBLS 23:30 - 18937' LOSS RATE OF —10 BPH. 00 :00 - 18965' 1/4/2012 00:00 04:15 4.25 ZONISO P OTHCMP DRILL AHEAD RATE AT 2.71 BPM WITH 3904 PSI. PVT OF 334 BBLS LOSS RATE OF —10 BPH. 0140 HRS - 19,018' RATE OF 2.69 BPM WITH 4,142 PSI. PVT OF 378 BBLS WITH —3.6 BPH LOSS RATE 0230 FIRS - 19,043' RATE OF 2.67 BPM WITH 3970 PSI. PVT OF 377 BBLS. 0415 HRS - 19,100' AT 2.68 BPM WITH 3984 PSI 04:15 - 04:45 0.50 ZONISO P OTHCMP 1000 FT WIPER TRIP. WHILE POOH AT 18,808' PULLED HEAVY TO 60K WORK PIPE DOWN. NO SUCCESS. 04:45 - 06:45 2.00 ZONISO - N STUC OTHCMP WORK PIPE DOWN 2 TIMES STACKING 10K AND LETTING JARS GO OFF. PULL UP TO 70K. MIXING LUBE PILL. 0630 HRS - GIVE 24 HOUR NOTICE TO AOGCC MATT HERRARA OF WEEKLY BOPE TEST. 06:45 - 07:00 0.25 ZONISO N STUC OTHCMP RIH TO JAR DOWN. STACK WT 4 TIMES, NO EVIDENCE OF JARS FIRING. V PUMP 5 MORE BBLS SLICK PILL OUT. 07:00 - 09:40 2.67 ZONISO N STUC OTHCMP PRESSURE UP TO 500 PSI WHP SEVERAL TIMES AND BLEED OFF WHILE IN COMPRESSION, NO MOVEMENT. PRESSURE UP TO 1000 THEN 1170 PSI, ESTABLISHISH INJECTIVITY AT 1200 PSI, 1.6 BPM. BLEED OFF QUICKLY, REPEAT 3 TIMES. NO MOVEMENT SEEN. DISCUSS OPTIONS WITH ODE AND CTD SUPT. GO TO NEUTRAL WEIGHT (40K) AND CIRC MIN RATE 09:40 - 15:50 6.17 ZONISO N STUC OTHCMP STACK WT TO COCK JARS, PULL UP TO 65K AND WAIT FOR JARS TO FIRE REPEAT, PULL TO 75K AND WAIT, JARS FIRE ONCE AND CT IS FREE POOH. PUMP 2.25 BPM / 3600 PSI WHILE POOH. 15:50 - 16:45 0.92 ZONISO N STUC OTHCMP TAG STRIPPER AND UD BHA. BIT HAS CHIPPED TEETH ON THE FACE. 16:45 - 00:00 7.25 ZONISO N STUC OTHCMP R/U AND DROP QTS FROM INJECTOR HEAD. INSTALL CUTTER ON INJECTOR HEAD. CUT 2,100' OF COIL AND UD. 1/5/2012 00:00 - 01:00 1.00 ZONISO N STUC OTHCMP CUT 400' OF COIL FORA TOTAL OF 2500' OF COIL CUT. L/D COIL CUTTER. 01:00 - 03:00 2.00 ZONISO N STUC OTHCMP R/U AND TEST COIL CONNECTOR TEST TO 4000 PSI AND 38K PULL TEST. GOOD TEST. Printed 2/6/2012 8:10:35AM w �� W. se Common Well Name: W -12 I AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 12/20/2011 End Date: X3- 00XXC -C: 'X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 05:30 2.50 ZONISO N STUC OTHCMP TEST LUBRICATOR AND TWCS TESTED TO 3500 PSI - GOOD INSPECT CHAIN REPLACING ELASTIMERS 23 EACH. CLEAN RIG FLOOR. 05:30 - 12:00 6.50 BOPSUR OTHCMP R/U TO TEST BOPE. TEST SWAB AND MASTER VALVE INDEPENDENTLY. OPEN BOP DOORS AND INSPECT RAMS. REPLACE BLADE SEAL ON BLIND/SHEAR RAMS AND TOP SEAL ON ONE UPPER COMBI RAM. INSTALL RAMS AND BOP DOORS. GET A SHELL TEST ON BOPS, FIND A GREASE PLUG ON THE CHOKE MANIFOLD LEAKING. CHANGE IT OUT AND GET A GOOD SHELL TEST. 12:00 - 18:00 6.00 BOPSUR P OTHCMP TEST BOPS, ALL RAMS, ANNULAR AND fg CHOKE ST IS VALVES. .„<", TEST S WITNESSED BY AOGCC INSPECTOR CHUCK SCHEEVE AND WSL, TOOLPUSHER. ACTIVATE BOPS FROM BOTH REMOTE STATIONS 18:00 - 18:30 0.50 BOPSUR P OTHCMP . R/D BOPE TEST EQUIPMENT. 18:30 - 22:00 3.50 ZONISO P OTHCMP FILL HOLE WITH 6.4 BBLS I POP OFF WELL. R/U TO SLIP AND CUT DRILLING LINE. PJSM FOR SLIP AND CUT. SLIP AND CUT LINE. 22:00 - 23:00 1.00 ZONISO N DPRB _ OTHCMP PJSM FOR P/U BHA. CLEAN OUT BHA WITH 19.5 OF VENTURI 23:00 - 00:00 1.00 ZONISO N DPRB OTHCMP RIH WITH CLEAN OUT BHA. RATE OF 0.39 WITH 1230 PSI. 1/6/2012 00:00 - 02:30 2.50 ZONISO N DPRB OTHCMP RIH WITH CLEAN OUT BHA. 0.5 BPM AT 1761 PSI. OBTAIN SPRS AND PARAMETERS. 40K UP WT. 12K DOWN WT. SPR FOR #1 - 1.0 BPM AT 2157 PSI, 0.5 BPM AT 1670 PSI, #2 - 1.0 BPM AT 2125 PSI, 0.5 BPM AT 1700 PSI 02:30 - 06:00 3.50 ZONISO N DPRB OTHCMP 15,000' RIH WASHING DOWN WITH REVERSE JUNK BASKET. RATE OF 2.36 BPM AT 3800 PSI. OBTAINING PARAMETERS EVERY 500' TAG SOMETHING AT 17,925' PUSHED DOWN 17,930' STACKING WT P/U AND PUSHED TO 17,935'. P/U IS CLEAN. 0500 HRS - 17,937' NOW OBTAINING PARAMETERS EVERY 250'. TAGGING UP 6 TIMES ATTEMPT TO SUCK UP BLOCK BY SLOWLY RIH ABOVE BLOCKAGE. CONTINUE TRYING TO WORK PAST 17935 FT, NOT ABLE TO. 06:00 - 10:15 4.25 ZONISO N DPRB _ OTHCMP POOH. 10:15 - 12:15 2.00 ZONISO N STUC OTHCMP TAG STRIPPER, UD VENTURI BHA. RECOVER ABOUT A SHOVELFUL OF SMALL CEMENT PIECES AND A FEW SMALL BITS OF BRASS COLORED METAL. 12:15 - 12:40 0.42 ZONISO N STUC - OTHCMP PJSM FOR M/U BHA #13. Printed 2/6/2012 8:10:35AM Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 I End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:40 - 13:15 0.58 ZONISO N STUC OTHCMP M/U BHA #12 - DS331 MILL, 3.79 NO -GO, AGITATOR, XTREME MOTOR, 3/4" DISCONNECT, JAR AND ACCELERATOR. 13:15 - 14:15 1.00 ZONISO N STUC OTHCMP WAIT ON 3/4" DISCONNECT FROM BTT IN DEADHORSE, THE DISCONNECT ON LOCATION HAS A 5/8" BALL SEAT. 14:15 - 14:50 0.58 ZONISO N STUC OTHCMP 3/4" DISCONNECT ARRIVES, FINISH M/U BHA. 14:50 - 18:00 3.17 ZONISO N STUC OTHCMP RIH, TEST AGITATOR AT 300 FT WORKING GOOD. 15600' 18:00 - 19:30 1.50 ZONISO N STUC OTHCMP AT 15,600' BRING UP TO RATE TO 2.45 BPM WITH 3750 PSI. 19:30 HRS - RIH AT 30 FT PER MIN TILL 17,830' WHEN BIT STARTED TAKING WEIGHT AND PRESSURE BEGAN INCREASING P/U AND PULLED FREE. WORKING DOWN SLOWLY TO OPEN UP HOLE. OBTAIN SPRS OF #1 - 0.5 BPM AT 1886 PSI, 1.0 BPM AT 2267 PSI, 2.5 BPM AT 3830 PSI. #2 - 0.5 BPM AT 1890 PSI, 1.0 BPM AT 2250 PSI, 2.5 BPM AT 3845 PSI. 19:30 - 22:15 2.75 ZONISO P OTHCMP DRILLING CEMENT FROM 17,830' CHECKING P/U EVERY 50' RATE OF 2.50 BPM WITH 3746 PSI. 2030 - HRS 17,895' AT 2.62 BPM WITH 3,823 PSI PUMP A 10 BBLS LOW VIS FOLLOWED BY 10 BBLS HI-VIS SWEEP. 21:15 HRS - 17941' WITH 2.61 BPM AT 3823 PSI. SEEING STRINGERS OF TIMES THAT THERE IS MOTOR WORK. 22:05 HRS - 17,987' WITH 2.62 BPM AT 3812 PSI. DRILL AHEAD TO 18,000'. 22:15 - 22:45 0.50 ZONISO P OTHCMP SHORT TRIP TO CLEAN HOLE AT 17,830' HOLD WELL CONTROL DRILL. 22:45 - 23:30 0.75 ZONISO P OTHCMP DRILL AHEAD WORKING ON GETTING BACK TO TD OF 19,100' RATE OF 2.63 BPM AT 3940 PSI. RIH TO 18,150' 23:30 - 00:00 0.50 ZONISO P OTHCMP WIPER BACK TO 17,830' 1/7/2012 00:00 - 00:30 0.50 ZONISO P OTHCMP WIPER TRIP TO 17,830' 00:30 - 01:45 1.25 , ZONISO P OTHCMP DRILL AHEAD AT 2.61 BPM WITH 3878 PSI. PVT OF 308 BBLS. 0100 HRS - 18,232' PUMP RATE OF 2.61 BPM WITH 3856PSI. 0130 HRS - 18,383' TAG UP AND STALL. P/U PULLED 10K OVER AND CAME FREE. 01:45 - 02:45 1.00 ZONISO P OTHCMP WIPER TRIP TO 17,800' PULLED HEAVY AND STALLED MOTOR AT 18,200' STOP AND RIH 50' PULL OUT OF HOLE AGAIN SEEING MOTOR WORK. AT 2.53 BPM WITH 3585 PSI WHILE POOH. RIH WITH NO PROBLEMS. Printed 2/6/2012 8:10:35AM Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:45 - 08:00 5.25 ZONISO P OTHCMP DRILL AHEAD AT 2.62 BPM WITH 3823 PSI. PVT OF 312 BBLS. 0330 HRS - 18476' RATE OF 2.62 BPM WITH 3850 PSI. PUMPED A 20 BBL LOW WITH 20 BBLSHI -VIS SWEEP SEEING A 10% INCREASE IN CUTTINGS AT THE SHAKERS. 0500 HRS - 18,660' RATE OF 2.62 BPM WITH 4006 PSI. 08:00 - 09:40 1.67 ZONISO P OTHCMP CONTINUE WORKING DOWNHOLE CAREFULLY. WT CHECK EVERY 50 FT. MIX UP A WEIGHTED HI-VIS PILL FOR SWEEP, 9.6 PPG. 09:40 - 11:00 1.33 ZONISO P OTHCMP PILL IS READY, PUMP 15 BBLS LO-VIS FOLLOWED BY 15 BBLS WEIGHTED HI -VIS. SOME RUBBER SEEN ON SHAKER, RIH TO TRY AND MILL NEW CEMENT. STALLING OFF BOTTOM, AT DIFFERENT DEPTHS. 11:00 - 14:20 3.33 ZONISO P OTHCMP DISCUSS WITH ODE AND CTD SUPT, DECISION IS MADE TO STOP MILLING CEMENT AT 19094 FT AND PROCEED TO THE NEXT STEP OF THE WELLPLAN. PULL LONG WIPER TRIP BACK TO 13000 FT. LO /HI -VIS SWEEP BRINGS BACK MORE SMALL PIECES OF RUBBER, NOTHING ELSE UNUSUAL. 14:20 - 16:10 1.83 ZONISQ P OTHCMP AT 13000 FT WIPER TRIP BACK DOWN TO 17800 FT. PUMP 15 BBLS LO THEN 15 BBLS HI-VIS SWEEP. 16:10 - 22:00 5.83 ZONISO P OTHCMP POOH, PUMP 2.50 BPM WHILE POOH. 22:00 - 23:00 1.00 ZONISO P OTHCMP L/D BHA MONITOR WELL - STATIC. MILL AT 3.37" NO GO. DISCONNECT WORN - ORDER OUT REPLACEMENT. 23:00 - 23:30 0.50 ZONISO P OTHCMP PRESSURE TEST WELL TO 1000 PSI FOR 5 MIN. PRESSURE DROPPED TO 650 PSI. AFTER 5 MIN. IT IS DETERMINED BY SLB KYLE THAT IS CAPABLE OF STARTING FIRING SEQUENCE. PRESSURED UP TO 1200 PSI TO SEE IF CAPABLE OF SHUT DOWN SEQUENCE PRESSURE BLEED OFF TO 825 PSI AFTER 2 MIN WHICH WAS DETERMINED TO BE GOOD. 23:30 - 00:00 0.50 ZONISO P OTHCMP P/U MEM LOG DRIFT RUN BHA WITH E FIRE TOOL. PROGRAM TOOL E -FIRE TOOL FOR TEST RUN DURING MEM LOG RUN 1/8/2012 00:00 - 02:30 2.50 ZONISO P OTHCMP FINISH P/U MEMORY LOG BHA WITH E -FIRE TOOL. PJSM AND WAIT ON DISCONNECT. BRING IN MEMORY TOOLS AND E -FIRE HEAD. 02:30 - 06:00 3.50 ZONISO P -_ OTHCMP RIH WITH .49 BPM AT 1095 PSI. RIH TO 13,000' AT 80' PER MIN. Printed 2/6/2012 8:10:35AM r ' P Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 1 End Date: X3- OOXXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:15 1.25 ZONISO P OTHCMP CONTINUE RIH TO STARTING DEPTH OF LOG RUN. PARK AT 13000 FT AND DISCUSS LOGGING PROCEDURE WITH SLB MEM LOGGER. LOG DOWN 60 FT /MIN FROM 13000 FT. 07:15 - 08:00 0.75 ZONISO P OTHCMP PARK AT 16775, TOP SHOT DEPTH FOR THE NEXT PERF RUN. PERFORM TEST OF EFIRE HEAD WHICH IS ON THE LOGGING STRING. 08:00 - 08:20 0.33 ZONISO P OTHCMP CONTINUE LOGGING DOWN. TAG AT 17008 FT, SET 7K DOWN CLEAN PICKUP REPEAT 2 MORE TIMES, CAN'T PASS. INCREASE PUMP RATE TO 1.3 BPM, TRY DIFFERENT RUNNING SPEEDS. 08:20 - 10:40 2.33 ZONISO P OTHCMP PICK UP AND START A LO-VIS FOLLOWED BY A HI-VIS PILL. WHEN PILL IS AT THE END OF THE CT SET ABOUT 3K DOWN ON THE TAG SPOT. WORK PIPE UP AND DOWN HERE 4 TIMES WHILE PILL IS EXITING, SET 4 -5K DOWN EACH TIME. P CKUPS ARE CLEAN EACH TIME 10:40 - 14:15 3.58 ZONISO P OTHCMP POOH. LOG 60 FT/MIN UP. 14:15 - 18:00 3.75 ZONISO P OTHCMP TAG STRIPPER AND FLOW CHECK WELL. L/D MEM LOGGING TOOLS AND DRIFT. DOWNLOAD DATA. 18:00 - 18:30 0.50 ZONISO P OTHCMP DISCUSS NEXT RUN WITH ODE, CTD SUPT AND WTL. DECIDE TO RUN A NOZZLE WITH WEIGHTED SWEEPS ON BOTTOM TO TRY AND CLEAN DEBRIS FROM WELL. WAIT ON 12 PPG SWEEP MATERIAL TO ARRIVE. 18:30 - 21:00 2.50 ZONISO P ■- OTHCMP T BHA WITH 3" NOZZLE RUN. TEST MUD MUD D PUMP. STAB INJECTOR AND TEST. 21:00 - 22:30 1.50 ZONISO P OTHCMP MIX AND PUMP HI-VIS PILL WITH SUPER SWEEP TO ENSURE NO PLUGGING ISSUES WHILE RIH. RATE OF 3.01 BPM WITH 3182 PSI. 22:30 - 00:00 1.50 ZONISO P ._ OTHCMP RIH 95 FT/MIN. 1/9/2012 r 00:00 - 01:00 1.00 ZONISO C ._ OTHCMP RIH WITH 2.91 BPM AND 3190 PSI. 95 FT /HR 01:00 - 04:30 3.50 ZONISO C OTHCMP RIH FROM 13,000' AT 15' PER HOUR. WHILE WAITING ON WEIGHTED MUD FROM PLANT - PUMP RATE OF 3.05 BPM WITH 3464 PSI. PUMP SWEEPS TO EXIT BIT AT —17,000' WHILE RIH. SWEEPS CONSIT OF 20 BBLS WATER FOLLOWED BY 20 BBLS VIS 12.0 PPG MUD WITH SUPER SWEEP. REPAINT FLAG AT EOP OF 16,493.86. NOTHING WAS SEEN WHILE RIH. Printed 2/6/2012 8:10:35AM e Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA I UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 08:40 4.17 ZONISO C OTHCMP 17,600' CIRCULATING SWEEPS SLOWLY WORKING PIPE. RATE OF 3.05 BPM WITH 3428 PSI. 1ST SWEEP RESULTS - SLIGHT INCREASE IN CUTTINGS AND ALOT OF SUPER SWEEP WAS SEEN AT SHAKERS. 05:15 - MIX AND PUMP SECOND SWEEP. BIT -- AT 17600' WHEN SWEEPS EXIT. 07:30 - PUMP 3RD SWEEP DOWN AND AROUND ON BOTTOM. RESULTS OF SWEEPS ARE SLIGHT INCREASE IN SMALL SIZE CUTTINGS, NO LARGE CUTTINGS RETURNED. 08:40 - 10:20 1.67 ZONISO C OTHCMP START FINAL PILL DOWN THE CT AT 17600 FT WAIT FOR PILL TO COME OUT NOZZLE THEN POOH. 10:20 - 15:00 4.67 ZONISO C OTHCMP POOH. PUMP 3.45 BPM ALL THE WAY OUT. PERFORM JOG AT SURFACE, 500 FT. NO EXCESS CUTTINGS SEEN. 15:00 - 16:00 1.00 ZONISO C OTHCMP TAG STRIPPER AND UD BHA. 16:00 - 18:00 2.00 ZONISO - C OTHCMP M/U NOZZLE TO SWIZZLE STACK. DROP 3/4 BALL AND PUMP IT AROUND AT THE SAME TIME. 18:00 - 19:00 1.00 ZONISO P OTHCMP CREW CHANGE INSPECT EQUIPMENT AND RIG WALK AROUND INSPECT NEXT BHA AND PERF GUNS. 19:00 - 21:30 2.50 ZONISO P OTHCMP PJSM FOR MAKING UP BHA. M/U BHA WITH 25 GUNS. 9VA M/U INJECTOR AND TESTED. 21:30 - 00:00 2.50 ZONISO P OTHCMP RIH WITH PERF GUNS RIH WITH 0.3 BPM AND 875 PSI RIH TO 6443' 1/10/2012 00:00 - 06:50 6.83 ZONISO P OTHCMP RIH WITH PERF BHA. RATE OF 0.30 BPM WITH 1025 PSI. 0430 HRS - 13,406' 06:50 - 07:50 1.00 ZONISO P OTHCMP STOP AT FLAG AND CORRECT -18 FT. RIH TO BALL DROP DEPTH, WHICH IS ABOUT 7 FT OFF OF SHOT DEPTH. PICK UP TO SHOT DEPTH AND PUMP 10 BBLS HI-VIS SWEEP AHEAD. SHUT DOWN AND DROP 5/8" STEEL BALL. LAUNCH WITH 2100 PSI, CHASE WITH HI-VIS PILL AT 1.1 BPM. 07:50 - 10:00 2.17 ZONISO P OTHCMP BALL IS HEARD ROLLIING, RIH TO SHOT DEPTH AND PUMP IT OVER THE GOOSENECK. AT 75% REEL VOLUME SLOW PUMP TO 0.7 BPM. AT 115 BBLS AWAY NO SIGN OF THE BALL GOING ON SEAT. CYCLE PUMPS UP AND DOWN, TRY SLIGHTLY HIGHER RATES., NO LUCK. 10:00 - 11:10 1.17 ZONISO P OTHCMP GO TO 0.5 BPM AND MOVE PIPE UP AND DOWN SLOWLY, NO LUCK PARK 2 FT BELOW SHOT DEPTH, PRESSURE SURGE CT 2 TIMES THEN GO TO 0.8 BPM. INCREASE RATE TO 1.26 BPM / 1900 PSI. PUMP A SECOND 15 BBL SWEEP AROUND, MORE VISCOUS THAN THE FIRST. Printed 2/6/2012 8:10:35AM o e a Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:10 - 12:15 1.08 ZONISO P OTHCMP BALL ON SEAT AT 185 BBLS AWAY. PRESSURE UP TO 4300 PSI AND FIRE GUNS, GOOD SHOT INDICATION FROM ACOUSTIC AND FLUID LOSS. HOLD 200 -300 PSI WHP, POOH AT 50 FT /MIN. 12:15 - 12:55 0.67 ZONISO P OTHCMP STOP AT 14000 FT AND BLEED OFF, FLOW CHECK WELL - TRIP SHEET IS -2 BBLS TO THIS POINT. AFTER 20 MIN FILL WELL WITH 0.7 BBLS. 12:55 - 15:10 2.25 ZONISO P OTHCMP -FILL WELL WITH 0.6 BBLS. POOH. 15:10 - 15:25 0.25 ZONISO P OTHCMP AT 6000 FT TRIP SHEET SHOWS -1 BBLS INSTEAD OF -5.4 BBLS DISPLACEMENT. STOP HERE AND FLOW CHECK WELL FOR 10 MIN, FLOW CHECK IS NEGATIVE. CUMULATIVE TRIP SHEET VOLUME IS EVEN TO THIS POINT. FILL WELL WITH 0.3 BBLS THEN CONTINUE POOH. 15:25 - 18:40 3.25 ZONISO P OTHCMP POOH. INVESTIGATE DISCREPANCY IN TRIP SHEET, FIND PIT #2 FLUID LEVEL IS LOW ENOUGH FOR THE AGITATOR TO DISTURB THE SURFACE OF THE FLUID GIVING ERRONEOUS PIT LEVEL READINGS. 18:40 - 19:00 0.33 ZONISO P OTHCMP CREW CHANGE, DISCUSS CURRENT OPS. CHECK EQUIPMENT. PJSM WITH SLB PERF CREW. REVIEW SOP FOR HANDLING PERF GUNS. 19:00 - 21:30 2.50 ZONISO P OTHCMP UD FIRING HEAD AND 25- 2.88" PERF GUNS. 21:30 - 22:30 1.00 ZONISO P OTHCMP MONITOR WELL. PJSM, LOAD OUT TOOLS, CLEAR AND CLEAN RIG FLOOR. PVT= 173 BBLS. 1/A =166 PSI, O/A= 0 PSI. 22:30 - 23:50 1.33 ZONISO P OTHCMP PJSM, P/U NOZZLE BHA # 16. NOZZLE, X/O,1 JT 2 3/8" PH6, X/O, HI-LO DC, DFCV, X/O, 1 JT 2 3/8" PH6, X/O, CTC. M/U INJECTOR. TEST QTS. 23:50 - 00:00 0.17 ZONISO P OTHCMP RIH WITH BHA # 16 PUMPING .5 BPM 1100 PSI. RIH 95 FPM. _ 1/11/2012 00:00 - 04:45 4.75 ZONISO P OTHCMP RIH WITH BHA # 16 PUMPING .5 BPM 1100 PSI. RIH 95 FPM. FLOWCHECKAT 6000' - .5 BBL DISCREPENCY IN TRIP SHEET. WELL STATIC- CONTINUE RIH. WT CHECK AT 15,400' P /U= 40K, S/O= 14K. RIH 30 FPM TO 16,775' 04:45 - 05:30 0.75 ZONISO P OTHCMP DISPLACE TO 2% KC. LOAD VAC TRUCK WITH MUD FROM PITS. STORE REMAINING MUD IN PITS, CLEAN PIT 2- FOR KCL VOLUME. 05:30 - 09:00 3.50 ZONISO P OTHCMP POOH. 09:00 - 10:00 1.00 ZONISO P OTHCMP PJSM FOR UD NOZZLE BHA. TAG STRIPPER AND UD BHA. TRIP SHEET IS -8 BBLS. Printed 2/6/2012 8:10:35AM s ar ter � - - _, - rt e Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA 1 UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 10:50 0.83 ZONISO P OTHCMP PERFORM INJECTIVITY TEST AS PER MEL IVESON, FULLBORE PE. ABLE TO PUMP 2 BPM AT 1600 PSI WHP, GOOD INJECTIVITY. 10:50 - 11:20 0.50 ZONISO P OTHCMP TEST MASTER VALVE AND WING VALVE TO MAKE TIE -IN TO WING 1502. TEST AND CHART 250 / 3500 PSI, GOOD. 11:20 - 14:30 3.17 ZONISO P OTHCMP PURGE KILL AND CHOKE LINE WITH AIR. DSM MAKE FINAL TIE -IN TO WELLHEAD AND PT THE SIT LINE. NORDIC CREW REBUILDS CHOKE VALVE #4 AND PT, GOOD. 14:30 - 14:50 0.33 ZONISO P OTHCMP PJSM WITH PUMP CREW, TRUCK DRIVERS AND RIG CREW ON SIT JOB. 14:50 - 15:30 0.67 ZONISO N SFAL OTHCMP DSM THAWING OUT SSV WITH HEATER TRUNK, TAKING MORE THAN 1 HR TO CLOSE. SLB HAVING ELECTRICAL PROBLEMS WITH THEIR PUMP VAN, CALLED OUT A MECHANIC FROM DEADHORSE. 15:30 - 18:00 2.50 ZONISO N SFAL OTHCMP SSV WORKING NOW, SLB WORKING ON - PUMP VAN PROBLEMS. SLB CALLED OUT ANOTHER PUMP VAN 18:00 - 18:30 0.50 ZONISO N SFAL OTHCMP -CREW CHANGE, DISCUSS CURRENT OPS. CHECK RIG EQUIPMENT. 18:30 - 19:40 1.17 ZONISO N SFAL OTHCMP PJSM, R/D SLB PUMP VAN. SLB PUMP VAN ON LOCATION AT 18:45. R/U FOR SIT PUMP JOB. 19:40 - 20:00 0.33 ZONISO P OTHCMP PJSM FOR SIT PUMP JOB WITH SLB PUMP CREW, RIG CREW AND TRUCK PUSHER. REVIEW MSDS FOR PRODUCTS PUMPED. 20:00 - 00:00 4.00 ZONISO P OTHCMP PT HARDLINE TO 3800 PSI. PUMP SIT JOB AS PER PUMPING SCHEDULE. 1/13/2012 00:00 - 02:00 2.00 ZONISO P OTHCMP CONTINUE TESTING BOPE. FINISH TESTING RAMS, CHOKE MANIFOLD VALVES, KILL VALVES, HCR , 3" MANUAL VALVE AND SAFETY VALVES TO 300/3500 PSI 5 MIN EACH. TEST ANNULAR TO 300/2500 PSI 5 MIN EACH. CHART RECORD TESTS. DISPLACE COIL WITH MUD WHILE TESTING BOPE. PERFORM ACCUMULATOR DRAWDOWN TEST. 02:00 - 03:05 1.08 ZONISO P OTHCMP PJSM, C/O PACKOFF. TEST INNER REEL VALVE AND PACKOFF TO 300/3500 PSI 5 MIN EACH. _ CHART RECORD TESTS. 03:05 - 04:00 0.92 ZONISO P OTHCMP PUMP SLACK FORWARD, PUMP 3.14 BPM 2800 PSI. PJSM, LOAD WHIPSTOCK AND RUNNING TOOLS ONTO RIG. BLOW DOWN KILL LINE. Printed 2/6/2012 8:10:35AM ate Yy 6 : 0 ,A t 4,9) Zit !Ng; t ip , 11070A014,10;itrAfR=6Ve,tWA* 7 :0 Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: 'X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA ' UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (ft) 04:00 - 06:30 2.50 ZONISO P OTHCMP OPEN MASTER AND SWAB VALVE. 14 BBLS TO FILL HOLE. M/U AND PT CHECKS TO 300/3500 PSI PT MP# 2 POP VALVE TO 300/3500 PSI 5 MIN EACH. CHART RECORD TESTS. PREP TO P/U WHIPSTOCK BHA. 06:30 - 07:30 1.00 ZONISO P OTHCMP M/U BHA #17, 4 -1/2" RETRIEVABLE MONOBORE PACKER WHIPSTOCK WITH. FLOAT VALVE. 07:30 - 11:00 3.50 ZONISO P OTHCMP SURFACE TOOL TEST IS GOOD. RIH, PUMP 0.4 BPM / 840 PSI THROUGH OPEN EDC. _ SLOW DOWN THROUGH ALL JEWELRY. 11:00 - 13:00 2.00 ZONISO P OTHCMP LOG GR DOWN FROM 13540 FT FOR INITIAL TIE -IN. CORRECT -7 FT. CONTINUE RIH. WEIGHT CHECK AT 15400 FT IS 43K. OFIENT TO 45L FOR REST OF TRIP IN HOLE. 13:00 - 13:30 0.50 ZONISO _ P OTHCMP TIE IN AGAIN AT 16620 FT, CORRECT +1.5 FT. RIH TO PAST SETTING DEPTH THEN PULL BACK TO IT. CLOSE EDC. PRESSURE UP CT TO 2800 PSI TO SHEAR OFF SETTING TOOL. 13:30 - 14:00 0.50 ZONISO P OTHCMP TRY TO SET WT ON WHIPSTOCK TO CONFIRM SET. RIH SLOWLY f T/MIN, SET 1K DOWN ON DHWOB. PICK UP AND GET SLOW PUMP RATES. CLOSE CHOKE AND PRESSURE UP WELL TO 500 PSI WHP, HOLDING GOOD. 14:00 - 18:00 4.00 ZONISO P OTHCMP POOH. TAG UP. 18:00 - 18:35 0.58 ZONISO P OTHCMP CREW CHANGE. DISCUSS ONGOING RIG OPS. CHECK EQUIPMENT. FLOWCHECK WELL- STATIC. PJSM FOR UD BHA # 17, P/U WINDOW MILL, BHA #18. 18:35 - 20:00 1.42 STWHIP P WEXIT SET BACK INJECTOR, UD WHIPSTOCK RUNNING TOOLS. M/U WINDOW MILL BHA # 18. 3.80" GO, 3.79 NO GO MILL, 3.79" STRING MILL, 2 7/8" XTREME MOTOR, 2 JTS 2 3/8" PH6, XO, XO, BS, DGS, DPS, EDC, PC, SWP, LQC, UQC, XO, CTC. M/U INJECTOR. TEST QTS, OPEN EDC. PVT= 300 BBLS. 1 /A= 211 PSI O /A= 13 PSI 20:00 - 00:00 4.00 STWHIP P WEXIT RIH 95 FPM PUMPING .5 BPM 1060 PSI. LOG TIE IN FROM 13,615 FT. -1.5 FT CORRECTION. P/U WT AT 16,000 FT= 44K. RIH TO 16,670' LOG TIE IN. + 1.5 FT CORRECTION. 1/14/2012 00:00 - 00:25 0.42 STWHIP P WEXIT RECORD SPR 1 AND 2 MP. RIH, TAG AT 16,764 FT. Printed 2/6/2012 8:10:35AM • North America - ALASKA - BP Page 23 o Operation Summary Report Common Well Name: W -12 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/20/2011 End Date: X3- 00XXC -C: ,X3- 00XXC -C: (3,750,054.00 ) Project: Prudhoe Bay I Site: PB W Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/17/1998 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292202300 Active Datum: W -12 @91.07ft (above Mean Sea Level) Date From - To j Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:25 - 01:30 i 1.08 STWHIP P WEXIT IPOH CONFIRM 16,720 N T. RE -TIE IN. 0 CORRECTION - TIE NOTIFY FIELD SUPERINTENDANT AND ODE- , ; THAT WE TAGGED TOP WHIPSTOCK 9 FT DEEPER THAN EXPECTED. DECISION MADE TO MILL WINDOW. 01:30 - 01:40 0.17 STWHIP P WEXIT 1 RIH, TAG PINCH POINT AT 16,764 FT. • 01• 40 - 09:00 7.33 STWHIP P I WEXIT TIME MILLING WINDOW FROM 16,763.6 FT. F/S = 3400 PSI 2.76 BPM. 40 PSI MOTOR \I-MA ► I WORK STARTING. MILL TO 16764.6' IN 1 HR. WOB= .8-1K. SLOWLY INCREASE WOB TO 2.6K WITH 160 PSI MOTOR WORK. PVT =390 BBLS. IN/OUT= 1/1 1 1/A= 297 PSI. O /A= 5 PSI. WHP= 63 PSI. 09:00 - 11:00 2.00 STWHIP P WEXIT CONTINUE MILLING WINDOW. 2.73 / 2.73 BPM @ 3400 PSI. DWOB = 1.4K, CT IWT =11K. 11:00 - 12:30 1.50 STWHIP P WEXIT !MILLING AT 16772.3 FT. 12.74 / 2.74 BPM @ 3500 PSI AFTER 16774 FT ALLOW MILL TO DRILL 1 i RATHOLE AT 10 -15 FT /HR. MILL RATHOLE TO 16782 FT. 12:30 - 14:10 1.67 STWHIP P WEXIT PICKUP SLOWLY AND REAM WINDOW. SEE ABOUT 50 -70 PSI MOTOR WORK AT THE BOTTOM OF THE WINDOW ON THE FIRST UP PASS. SECOND PASS IS CLEANER. L _ THIRD PASS HAS NO MOTOR WORK. 14:10 - 15:00 0.83 STWHIP P WEXIT ;PICK UP AFTER FINAL PASS AND SHUT DOWN PUMP. DRY DRIFT DOWN THROUGH WINDOW IS CLEAN. START 30 BBLS HI-VIS SWEEP DOWN THE CT. 15:00 19:45 4.75 STWHIP P WEXIT POOH. ATTEMPT TO OPEN EDC AT 13000 FT. POH PUMPING 2.53 BPM 2900 PSI. PJSM FOR BHA CHANGE. TAG UP. 19:45 - 19:55 0.17 STWHIP P WEXIT FLOWCHECK WELL, STATIC. PVT= 294 BBLS. _ 19:55 - 20:30 0.58 STWHIP P WEXIT SET BACK INIJECTOR, LID WINDOW MILL BHA #18. MILL= 3.78 GO, 3.77 NO GO. 1 STRING REAMER = 3.79 GO, 3.78 NO GO. 20:30 - 21:00 0.50 STWHIP P WEXIT PJSM, CHECK TREE BOLTS. NO LOOSE BOLTS FOUND, ALL BOLTS REMAINED TORQUED, 21:00 - 22:15 1.25 DRILL P PROD1 M/U BUILD BHA # 19. 3.75" PDC BIT, 2 7/8" ULS MOTOR, HOT, DGS, DPS, EDC, PC, SWP, LQC, UQC, XO, CTC. M/U INJECTOR. TEST QTS. OPEN EDC. _ 22:15 - 00:00 1.75 DRILL P PROD1 RIH 95 FPM PUMPING .5 BPM 1000 PSI. Printed 2/6/2012 8:10:35AM III TREE= 4- 1/16" FMC W 2A L 1 & L2 PER 1570 WELL ANGLE - 70 @ 13768' * ** PER WELLHEAD = FMC FS @ 15700 ' - 15940' POSSIBLY SQZ (05!14!07) ACTUATOR = BAKER I KB. ELEV = 83.67' Operation Shutdown M ILLED OUT (02/24/09) - SEE AWGRS * ** BF. ELEV = 54.37' KOP = 880' Max Angle = 98 @ 14783' Datum MD = 13782' ' 2159' H4 -1/2" HES X NIP, ID = 3.813" I Datum TVD = 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 68 #, L -80, ID = 12.415" I—{ 3079' I� 7 3873 3198 ; 52 MMG DOME RK 16 09/17/07 6 5965 4409 55 MMG DMY RK 0 11/22/98 © 5 7408 5226 ' 56 MMG DOME RK 16 09/17/07 4 8735 5989 ' 54 MMG DMY RK 0 11/22/98 Minimum ID = 3.80" @ 13399' 3 10062 6789 ' 52 MMG DOME RK 16 09/17/07 4 -1/2" HES XN NIPPLE milled out 2 11390 7597 57 MMG SO RK 22 09/17/07 1 12471 8197 ' 59 MMG DMY RK 0 03/22/07 J 1274T I—{TOP OF BKR TIEBACK SLV, ID = 7.50" 12754' H9-5/8" X 7" BKR ZXP PKR, ID = 6.188" I TOP OF CEMENT 12710' ------ 12760' I- 19 -5/8" X 7" BKR HMC HGR, ID = 6.188" I EZSV H 13070',4 19 -5/8" CSG, 47 #, NT -80S, ID = 8.681" H 14075' I \ 9 -5/8" MILLOUT WINDOW (W -12A) 12905' - 12965' PERFORATION SUMMARY 13411' 1—I 4 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" I REF LOG: BHI CCL /GR ON 1/10/12 I ' 13344' 1— I4 -1/2" HES X NIP, ID = 3.813" I ANGLE AT TOP PERF: 93 @ 16775' Note: Refer to Production DB for historical perf data 10 g 13355' H7" X 4 -1/2" BKR S -3 PKR, ID = 3.875" I SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8" 4 16775 - 17525 Open 01/10/12 I I 13379' I— I4 -1/2" HES X NIP, ID = 3.813" I ' 1—I 4-1/2" HES XN NIP, ID = 3.80" (milled out) I 13410' H 7" X 4 -1/2" BKR TIEBACK SLV, 11215.25"i / " 13411' 1-14-1/2" WLEG, ID= 3.958" j 13423' H ELMD TT LOGGED 07/30/99 I • r 7 13416' H7" X 5" BKR ZXP LTP w /HGR, ID= 4.458" SEE SAFETY NOTE FOR DETA ILS 4 ■ 7" LNR, 29 #, L -80, MOD, .0371 bpf, ID = 6.184" H 13577 v ��' l 6 14574' I— I4 -1/2" MARKERJT Y 15609' H4-1/2" MARKER JT //��� j L1: 16774' - 17096' C ,.;( -f- ‘,)-- Cement Milled Out to Full Liner ID Drift • Re- perforate 750 ft Zn 4 / so tc Mill cement to 19,094 5 -- 1 14 -1 /2" LNR. 12.6 #, L -80, NSCT, .0152 bpf, ID = 3.958" H 20888' I - � �� �� 20800' I— PBTD . DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT r 1990 ORIGINAL COMPLETION 02/24/09 RLM/PJC MILL CMT PLUG WELL: W -12A L1 11/22/98 JJONES SIDETRACK NABORS 18E 03/01/09 PJC DRAWING CORRECTIONS PERMIT No: 211 -118 05/03/07 CJA /PJC SET CBP 1 01/19/11 MR CTD SIDETRACK API No: 50- 029 - 22023 -01 05/13/07 JGM/PJC CEMENT PLUG SEC 21, T11 N, R12E, 1542' SNL & 1196' WEL 09/17/07 DAV /PJC GLV C/O 01/14/09 CJA /SV MILL CMT PLUG (12/18/08) BP Exploration (Alaska) W -12AL 1 & AL2 Page 1 of 1 • • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) pi-1) / S2 _ a P2 -- January Sent: Janua 19 , 2012 8:35 AM LJ 1 d 2 To: Ross, Matthew Subject: RE: W -12AL1 & AL2 (211 -118) Ross, Per our conversation please submit a 403 sundry with an operational shutdown for the lateral AL1. Hold off on a 10-404 till you have a better idea of how long it will be till you get back on the well to finish up the lateral. m h rb re can still be perfed and put on production as you see fit. If it looks like longer ate I a. The of e o p p p y than 60 days till you restart work then submit a 10-404 report on the drilling work to date. Y Y p 9 Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Ross, Matthew [mailto:rossmo @BP.com] Sent: Thursday, January 19, 2012 7:29 AM � FEB To: Schwartz, Guy L (DOA) '' 4 Lai- Subject: W -12AL1 & AL2 Ea Guy; We do not have the required equipment, specifically a coiled tubing reel with sufficient length to drill the second lateral, AL2 on W -12. In the planning phase of the well, we did have two coiled tubing reels specifically built to meet the extended length required to drill both laterals. However, due to equipment failure for the first reel & human error for the second reel we do not have the required equipment to start drilling AL2. We do plan to return to W -12 and drill the second lateral. This process to acquire two more reels of sufficient length from the manufacture will require time. I need guidance on how to leave W -12 (operational shutdown or otherwise). Many thanks. Matt Ross 980 -0552 2/23/2012 STATE OF ALASKA ALASKA WAND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other is CEMENT SQUEEZE Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ 5/2007 Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development El Exploratory ❑ , 198 -1820 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 - 50- 029 - 22023 -01 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 047452 * PBU W -12A 10. Field /Pool(s): ., PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 20888 feet Plugs (measured) 15050 feet true vertical 9049.46 feet Junk (measured) None feet Effective Depth measured 20800 feet Packer (measured) 12754 13335 13416 feet true vertical 9035.66 feet (true vertical) 8348 8688 8727 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 40 - 150 40 - 150 Surface 2989' 13 -3/8" 68# L -80 38 - 3027 38 - 2683 5020 2260 Production 12928' 9 -5/8" 47# NT80S 37 - 12965 37 - 8471 6870 4760 Liner 830' 7" 29# L -80 12747 - 13577 8344 - 8802 8160 7020 Liner 7478' 4 -1/2" 12.6# L -80 13410 - 20888 8724 - 9049 8430 7500 Liner Perforation depth: Measured depth: SEE ATTACHED - :_ - r MM ED ') f ! F True Vertical depth: .. _ LU — — Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 34 - 13411 34 - 8725 Packers and SSSV (type, measured and true vertical depth) 7" Baker ZXP Packer 12754 8348 4 -1/2" Baker S -3 Pemi Packer 13335 8688 4 -1/2" Baker ZXP Packer R ECE V o 8727 12. Stimulation or cement squeeze summary: AUG 2 6 20il Intervals treated (measured): e & Gas C'. Dommission Treatment descriptions including volumes used and final pressure: rhnte 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 25 228 3301 227 Subsequent to operation: SI 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 0 .. Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ,. 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGO GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na - 0e Lastu ilk , i Title Petrotechnical Data Technologist Signatu1 ,, Phone 564 -4091 Date 8/25/2011 RBDMS AUG 2 6 2011 g z . r( Form 10 -404 Revised 10/201 Submit Original Only W -12A 198 -182 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base W -12A 11/17/98 PER 16,734. 17,516. 8,933.36 8,977. W -12A 11/17/98 PER 19,550. 20,450. 8,955.02 8,978.34 W -12A 4/29/02 APF 15,865. 15,885. 8,987.35 8,987.43 W -12A 4/29/02 APF 15,920. 15,940. 8,987.68 8,987.89 W -12A 5/3/02 APF 15,780. 15,820. 8,990.26 8,988.29 W -12A 5/4/02 APF 15,700. 15,740. 8,993.83 8,992.11 W -12A 5/5/02 APF 14,950. 14,970. 8,919.21 8,917.91 W -12A 5/5/02 APF 14,255. 14,275. 8,948.11 8,950.36 W -12A 9/10/06 MLK 14,228. 14,229. 8,945. 8,945.11 W -12A 9/10/06 MLK 14,567. 14,568. 8,963.84 8,963.76 W -12A 9/10/06 MLK 14,650. 14,651. 8,955.28 8,955.17 W -12A 5/3/07 BPS 15,050. 20,450. 8,917.07 8,978.34 W -12A 5/11/07 SQZ 14,000. 15,040. 8,918.22 8,916.67 • W -12A 5/13/07 SQZ 13,500. 15,040. 8,766.82 8,916.67 W -12A 5/14/07 SQZ 13,500. 20,450. 8,766.82 8,978.34 W -12A 5/30/07 BPP 15,050. 15,688. 8,917.07 8,994.31 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • . • W -12A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 5/3 /2007 :Continued from 05/02/07 WSR. POOH. MU /RIH w/ Baker 4.5" composite bridge :plug. Set Baker CBP at 15,050' CTMD, confirm plug is set by setting 3K down and plug did not move. POOH to remove BOT MHA (1/2" setting ball recovered) and MU cementing BHA with 2.25" OD BH BDJSN. Standby while waiting on a third pilot test to be ran at the lab per town engineer and the rig move in progress to G -pad. Suspend job due to cement test results. RDMO. 5/10/2007;MIRU CTU # 9. Continued on 05/11/07 WSR. 5/11/2007: Continued from 05/10/07 WSR. MU /RIH w/ 2.25" BDN w/ big hole. Bleed IA. Tag CBP at 15050' -Paint flag 15040' - Kill well and place 85 bbl diesel on backside- Cool sump down coil with 313 bbl KCL. Lay in cement from flag @ 15040'. Pull to cement 'top of 14000', close choke, build +1000 psi WHP. Lay in remaining cement to total of 1 73.6 bbls to a top of 11268'. Pull to safety @ 10500'. Cement was LARC, 19 bbls neat + 48 bbls w/ 8# agg +6.6 neat tail. Hesitate @ safety. Continued on 05T12/07 WSR. i 5 /12 /2007Continued from 05/11/07 WSR. Hold 1850 psi (2500 DP @perfs) for 48 mins. Lost 1 5% of DP. Slowly release WHP to 500 psi. Contaminate into hole. Reduce rate to 1 bpm across perfs /holes. Tag node © 14266'. Work past. Jet to plug © 15050'. Jet up, lost returns. Re -tag plug, OK. Jet up above perfs /holes. Getting 40 -80% returns. ;Jet out from 14180 washing jewelry w /POH - On surface Conduct injectivity test - ;1465 whp /1 bpm - 1635 whp /1.5 bpm - 1650 whp /2.0 bpm - 1700 whp /2.5 bpm (broke '. back to 1380 whp then back to 1700 whp) - 1700 whp /3.0 bpm - Discuss plan forward with APE /CT Coord (re squeeze with 30 bbls LARC cmt) Order /wait on new cement j and fluids- RIH Tag btm @ 15042'. PU 10' flag CT. Circ bottoms up w/ 20 bbl bio ;sweep and XS KCL. Begin cool down w/ KCL. Continued on 05/13/07 WSR. — --- 5/1372 - 607 Continued from 05/12/07 WSR. Load backside w/ 86 bbls diesel. Cool down sump ;w/ 536 bbl of KCL. Lay in LARC from 15040' to 13146' - Close ck 14200'above holes ':- bump whp to 1400 psi -cont lay in cmt at 1:1- slowly inc whp to 2000 psi when pwhp broke back to zero - Wait 1 hr attempt to regain whp unable to bring whp above 140 psi - 18 bbls behind pipe - drop ball - chase with BIO to contaminate and cleanout - j POH at 80% washing jewlery and chasing BIO to surface, Discuss plan forward with APE / CT Coordinator - Order new cement and fluids. FP coil and cap BS - Injectivity test 1 bpm /425 whp - 2 bpm /730 whp - 3 bpm /1200 - 4 bpm /1420 whp - Break of well. Recover ball, inspect nozzle. MU /RIH w/ same 2.25" BDN. Continued on 05/14/07 WSR. • • . 5/14/2007' Continued from 05/13/07 WSR. RIH w/ 2.25" BDN. Bleed /liquid pack IA w/ 32 bbl `diesel. Tag plug © 15045'. Correct to set depth. Flag CT. Bullhead 350 bbl KCL down backside. Top backside w/ 85 bbl diesel. Pump KCL down CT to cool :perfs /sump. Pump 97 bbls of LARC (35 neat, 20 w/ 1# cemnet, 35 neat). Lay in from ;flag to 14000'. SI, get 1000 psi bump after 17 behind pipe. Lay in remaining cement. Pull to safety. Hesitate, try build WHP. Leak off improving toward set time. Total 50 bbl behind pipe. Never stopped bleeding off. Hold 800 psi (1500 DP @ perfs) while drop ball and RIH to contaminate. Getting 1:1 returns. Release pressure to 200 psi ;WHP (500 DP @ perfs) @ 13500'. Reduce rate /speed to 1 bpm @ 14100'. Jet to ;plug @ 15042'. Make repeat jet to 10500' and back to TD. Continued on 05/15/07 'WSR. - 5 /15 /2007iContinued from 05/14/07 WSR. Complete 3rd jetting pass to TD. Final pass to hard ;tag @ 15007. Lay in 15 bbls of TEA across pert interval. Chase out @ 1:1, making slow passes across jewelry. Getting 1:1 returns w/ 200 psi WHP. Wash BOP's . :Test squeeze to 469 psi for 6 min's. No leak off. RDMO. ** *"waiting for UCA results to PT cement"' FLUIDS PUMPED BBLS 458 METH/WTR 2683 1% KCL 298 DIESEL 255 FRESH WATER 206 LARC CEMENT 595 1.5# BIO 1435 XS 1% KCL 5930 TOTAL III TREE= K 4 FMC SAFETY NOT ELL ANGLE - 70° @ 13768' * ** WELLHEAD = FMC W PERFS @ 1515940' POSSIBLY SQZ (05114107) ACTUATOR = BAKER 2A & MILLED OUT (02/24/09) - SEE AWGRS * ** KB. ELEV = 83.67' - - - BF. ELEV = 54.37' KOP = 880' Max Angle = 98 @ 14783' ' , 1 2159' H4-1/2" HES X NIP, ID = 3.813" I Datum MD = 13782' Datum TV D = 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3873 3198' 52 MMG DMY RK 16 08/09/11 113 -3/8" CSG, 68 #, L -80, ID = 12.415" H 3079' ( — A 6 5965 4409' 55 MMG DMY RK 0 11/22/98 EI 5 7408 5226 56 MMG DMY RK 0 08/09/11 4 8735 Minimum ID = 3.725 �� @ 13399 ' 3 10062 6789 ' 52 MMG DMY RK 0 08/09/11 4-1/2" HES XN NIPPLE 2 11390 7597'57 MMG DMY RK 0 08/09/11 1 12471 8197' 59 MMG DMY RK 0 03/22/07 12747' ( TOP OF BKR TIEBACK SLV, ID = 7.50" I I 12754' 1- -I9 - 5/8" X 7" BKR ZXP PKR, ID = 6.188" I 12760' H9-5/8" X 7" BKR HMC HGR, ID = 6.188" I I TOP OF CEMENT I - 1 12710' -i • PERFORATION SUMMARY ! j �• REF LOG: ANA DRILL ME RESISTIVITY ON 10/04/98 • �♦ ANGLE AT TOP PERF: 83 @ 14255' �I • 4 • Note: Refer to Production DB for historical perf data • • • SIZE SPF INTERVAL Opn /Sqz DATE � O 9 -5/8" MILLOUT WINDOW (W -12A) 12905' - 12965' 2 -7/8" 4 14255 - 14275 S 05/13/07 •4, 2 -7/8" 4 14950 - 14970 S 05/13/07 ••• 2 -7/8" 4 *15700 - 15740 C/S? 05/04/02 ••••. 2 -7/8" 4 *15780 - 15820 C/S? 05/03/02 i'i�i. 13344' 4 -1/2" HES X NIP, ID = 3.813" • i i 2 -7/8" 4 *15865 - 15885 C/S? 05!03/02 s••••�•• 2 -7/8" 4 *15920 - 15940 CIS? 04/29/02 • i • � • i • • • i 13355' 7" X 4 -1/2" BKR S-3 PKR, ID = 3.875" 2 -3/4" 4 16734 - 17516 C 11/17/98 •••••. •••••••••••• 2 -3/4" 4 19550 - 20450 C 11/17/98 ••••••• 13379' liA, 13379' 4 -1/2" HES X NIP, ID = 3.813" I ac4... . *.AAA_• SEE SAFETY NOTE FOR DETAILS ■ v� 13399' 4 -1/2" HES XN NIP, ID = 3.725" ( EZSV 1 13070' 13410' 7" X 4 -1/2" BKR TIEBACK 19 -5/8" CSG, 47 #, NT -80S, ID = 8.681" I-I 14075' SLV, ID = 5.25" 13411' H4 -1/2" WLEG, ID = 3.958" I ' . I 13423' j-I ELMD TT LOGGED 07/30/99 1 1 4-1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" H 13411 VI' I 13416' I — 7" X 5" BKR ZXP LTP w / HGR, ID = 4.458" 7" LNR, 29 #, L -80, MOD, .0371 bpf, ID = 6.184" I - 1 13577' 14574' H4-1/2" MARKER JT I 15609' H4 -1/2" MARKER JT I 'TOP OF CEMENT (MILLED 12/18/08), BOTTOM UNKNOWN H 15688' CTM I •; %` clap isesi; 4 4 -1/2" LNR, 12.6 #, L -80, NSCT, .0152 bpf, ID = 3.958" 1-1 20888' . may, 20800' PBTD DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT ® 1990 ORIGINAL COMPLETION 02/24/09 RLM/PJC MILL CMT PLUG WELL: W -12A 11/22/98 JJONES SIDETRACK NABORS 18E 03/01/09 PJC DRAWING CORRECTIONS PERMIT No: '1981820 05/03/07 CJA /PJC SET CBP 08/16/11 GJB/ PJC GLV /O (8/9/11) AR No: 50- 029 - 22023 -01 05/13/07 JGM/PJC CEMENT PLUG SEC 21, T11 N, R12E, 1542' SNL & 1196' WEL 09/17/07 DAV /PJC GLV C/O 01/14/09 CJA /SV MILL CMT PLUG (12/18/08) BP Exploration (Alaska) • • Page 1 of 1 Lastufka, Joseph N (Wipro) From: Schwartz, Guy L (DOA) [guy.schwartz @alaska.gov] Sent: Friday, August 19, 2011 9:54 AM To: Vazquez, Eleazar Cc: Lastufka, Joseph N (Wipro) Subject: RE: W -12A L1 & L2 Sundry & Permit to Drill (PTD 198 -182) Eleazar, Based on what I can tell from our records you won't need to submit a 403 to do cover the pre - drilling wellwork on the motherbore. The well was never suspended and you are proposing to add two laterals and reperf some of the liner in the Motherbore. Submit a 401's for each lateral with a full detail of the operational steps (pre and post lateral drilling operations) needed and you should be good to go. Note 1 A 10 -404 report should be generated after the wellwork is completed for the motherbore (PTD 198 -182) to capture the milling and post perfing once the laterals are completed. Note 2 The Commission never received a report on the cementing sqz job that occurred in 2007 on the motherbore W -12A (PTD 198 -182) This should have been reported in a 10 -404. We have the milling operation details from 2008 in our records however. Can you submit that data for our records.. on a 10- 404 please. Call me if you have any questions. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Vazquez, Eleazar [mailto:vazge0 @BP.com] Sent: Thursday, August 18, 2011 5:10 PM To: Schwartz, Guy L (DOA) Subject: W -12A L1 & L2 Sundry & Permit to Drill Hi Guy, A series of cement squeeze jobs were performed on well W -12A in May 2007 that successfully abandoned the perfs and holes inside the 4' /z" liner as planned. However, the plug set at 15,050' and failed and allowed the cement to get past it and inside the 41/2" liner. To the best of my knowledge, the current top of cement inside the 4'/2" liner is 15,850' and with an unknown bottom of cement (could be all the way to PBTD or shallower). As Nordic 1 is planning to mill all of the cement inside the liner, drill two laterals, retrieve the whipstocks, and re perforate the area that was plugged with the failed squeeze cement jobs in 2007 (see schematics attached). Question: Do I need to submit an application for Sundry Approval? Or, would an application for PTD suffice? Thanks in advance, Eli Vazquez Drilling Engineer, Coiled Tubing Drilling BP Exploration (Alaska) Inc. Office: (907) 564 -5918 Mobile: (907) 240 -8137 8/19/2011 • Page 1 of l Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, August 19, 2011 9:54 AM To: 'Vazquez, Eleazar' Cc: 'Lastufka, Joseph N (Wipro)' Subject: RE: W -12A L1 & L2 Sundry & Permit to Drill (PTD 198 -182) Eleazar, Based on what I can tell from our records you won't need to submit a 403 to do cover the pre - drilling wellwork on the motherbore. The well was never suspended and you are proposing to add two laterals and reperf some of the liner in the Motherbore. Submit a 401's for each lateral with a full detail of the operational steps (pre and post lateral drilling operations) needed and you should be good to go. Note 1 A 10 -404 report should be generated after the wellwork is completed for the motherbore (PTD 198 -182) to capture the milling and post perfing once the laterals are completed. Note 2 The Commission never received a report on the cementing sqz job that occurred in 2007 on the motherbore W -12A (PTD 198 -182) This should have been reported in a 10 -404. We have the milling operation details from 2008 in our records however. Can you submit that data for our records.. on a 10- 404 please. Call me if you have any questions. Guy Schwartz AAINILD AU 6 1 9 2 01) Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Vazquez, Eleazar [mailto:vazge0 @BP.com] Sent: Thursday, August 18, 2011 5:10 PM To: Schwartz, Guy L (DOA) Subject W -12A L1 & L2 Sundry & Permit to Drill Hi Guy, A series of cement squeeze jobs were performed on well W -12A in May 2007 that successfully abandoned the perfs and holes inside the 41/2" liner as planned. However, the plug set at 15,050' and failed and allowed the cement to get past it and inside the 4 liner. To the best of my knowledge, the current top of cement inside the 4°/2" liner is 15,850' and with an unknown bottom of cement (could be all the way to PBTD or shallower). As Nordic 1 is planning to mill all of the cement inside the liner, drill two laterals, retrieve the whipstocks, and re perforate the area that was plugged with the failed squeeze cement jobs in 2007 (see schematics attached). Question: Do I need to submit an application for Sundry Approval? Or, would an application for PTD suffice? Thanks in advance, Eli Vazquez Drilling Engineer Coiled Tubing Dulling BP Exploration (Alaska) Inc Office ( 907) 534-5918 Mobile (907) 240 -8137 8/19/2011 TREE = FMC WELLHEAD = 4-1/16" FMC 1111-12R multi I a t S� N @l it WELL LL ANGLE - 70 13 ( * ** 07) ACTUATOR = BAKER G KB. ELEV = 83.67' Proposed CTD Sidetrack & MILLED OUT (02/24/09) - SEE AWGRS *** BE ELEV = 54.37' KOP = 880' Max Angle = )8 @ 14783' _'l Datum MD = 13782' 4 I V ' ' I 2159' — - 1/2" HES X NIP, ID = 3.813" Datum TVD = 8800' SS VV I 1- GAS LIFT MANDRELS 0q `1F ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3873 3198 ` 52 MMG DOME RK 16 09/17/07 13 -3/8" CSG, 68 #, L -80, ID = 12.415" H 3079' IAI 6 5965 4409 r 55 MMG DMY RK 0 11/22/98 5 7408 5226 56 MMG DOME RK 16 09/17/07 0 4 8735 5989 54 MMG DMY RK 0 11/22/98 3 10062 6789 r 52 MMG DOME RK 16 09/17/07 Minimum ID = 3.725" 13399' 2 11390 759757 MMG SO RK 22 09/17/07 4-1/2" HES XN NIPPLE 1 12471 8197 59 MMG DMY RK 0 03/22/07 ) 12747' -TOP OF BKR TIEBACK SLV, ID = 7.50" I 12754' — - 5/8" X 7" BKR ZXP PKR, ID = 6.188" TOP OF CEMENT — 12710' 7--......... 12760' - -I9 - 5/8" X 7" BKR HMC HGR, ID = 6.188" I I ¢sv H 13070' 1 9 -5/8" CSG, 47 #, NT -80S, ID = 8.681" I--I 14075' \ 9 -5/8" MILLOUT WINDOW (W - 12A) 12905' - 12965' PERFORATION SUMMARY REF LOG: ANADRILL ME RESISTIVITY ON 10/04/98 ANGLE AT TOP PERF: 83 @ 14255' I I I 13344' — 4-1/2" HES X NIP, ID = 3.813" Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE z L 13355' H7" X 4-1/2" BKR S -3 PKR, ID = 3.875" 2 -7/8" 4 14255 - 14275 S 05/13 /07 ' , [ 13379' H4-1/2" HES X NIP, ID = 3.813" 2 -7/8" 4 14950 - 14970 S 05/13 /07 I 2 -7/8" 4 *15700 - 15740 GS? 05 /04 /02 ' ' 13399' — 4 -1/2" HES XN NIP, ID = 3.725" 2 -7/8" 4 *15780 - 15820 GS? 05 /03 /02 I 13410' Id 7" X 4 -1/2" BKR TIEBACK SLV, ID5.25" 2-7/8" 4 *15865 15885 GS? 05/03/02 " I 13411' — 4-1/2" WLEG, ID = 3.958" 2 -7/8" 4 *15920 - 15940 GS? 04/29 /02 13423' I amp TT LOGGED 07/30/99 2 -3/4" 4 16734 - 17516 C 11/17/98 / T 13416' 7" X 5" BKR ZXP LTP w /HGR, ID= 4.458" 2 -3/4" 4 19550 20450 11 /17/98 *SEE SAFETY NOTE FOR DETAILS , 2 -7/8" Slotted liners 4-1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" H 13411' • _ 14574' LI4 -112" MARKER ''''''''' L2: 15740' - 17005' 1 7" LNR, 29#, L -80, MOD, .0371 bpf, ID = 6.184" — 13577' J 15609' - -f4 -1/2' MARKERT L Top of Cement (2/24 /09), Bottom Unknown 15973' H : » » »:< <:::=:_ Li.. >:<- ;: >::> L1 :L1: 16755' - 17830' Retrieve all Whipstocks ' 1 Mill cement to 20,470' —I 20800' I—[ PBTD 4-1/2" LNR, 12.6#, L -80, NSCT, .0152 bpf, ID = 3.958" —I 20888' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 1990 ORIGINAL COMPLETION 02/24 /09 RLM/PJC MILL CMT PLUG WELL: W -12A 11/22/98 JJONES SIDETRACK NABORS 18E 03/01 /09 PJC DRAWING CORRECTIONS PERMIT No: "1981820 05/03 /07 CJA /PJC SET CBP AR No: 50- 029 - 22023 -01 05/13 /07 JGM/PJC CEMENT PLUG SEC 21, T11 N, R12E, 1542' SNL & 1196' WEL 09/17 /07 DAV /PJC GLV GO 01/14 /09 CJA/SV MILL CMT PLUG (12/18 /08) BP Exploration (Alaska) TREE= „ 4 -1/16” FMC • WELLHEAD= FMC VV-1 2A SAFETY NOT HORIZONTAL WELL - 70° @ 13768' ACTUATOR= BAKER KB. ELEV = 83.67' BF. ELEV = 54.37' KOP = 880' Max Angle = 98 @ 14783' ' I 2159' H4 -1/2" HES X NP, ID = 3.813" I Datum MD = 13782' Datum ND = 8800' SS GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 68 #, L -80, ID = 12.415" H 3079' I-- 7 3873 3198 52 MMG DOME RK 16 09/17/07 6 5965 4409 r 55 MMG DMY RK 0 11/22/98 5 7408 5226 ' 56 MMG DOME RK 16 09/17/07 Minimum ID = 3.725" @ 13398' 4 8735 5989 ' 54 MMG DMY RK 0 11/22/98 3 10062 6789 r 52 MMG DOME RK 16 09/17/07 4 -1/2" HES XN NIPPLE 2 11390 75957 MMG SO RK 22 09/17/07 1 12471 8197 r 59 MMG DMY RK 0 03/22/07 12747' H TOP OF BKR TIEBACK SLV, ID = 7.50" I ��� 0 12754' H 9 -5/8" X 7" BKR ZXP PKR, ID = 6.188" I I TOP OF CEMENT H 12710' 12760' I- 19 -5/8" X 7" BKR HMC HGR, ID = 6.188" I PERFORATION SUMMARY 1 / 1� ►0 14 \ 9 - 5 /8" MILLOUT WINDOW 12905' REF LOG: ANADRILL ME RESISTIVITY ON 10/04/98 1 11 11 1 TO 12965' (SECTION MILL) ANGLE AT TOP PERF: 83 @ 14255' ►ij 1,1 Note: Refer to R DB for historical perf data i� I1. SIZE SPF INTERVAL Opn /Sqz DATE 11 S1 1 13344' 4 -1/2" HES X NIP, ID = 3.813" 2 -7/8" 4 14255 - 14275 S 05/13/07 14' 2-7/8" 2 -7/8" 4 14950 -14970 S 05/13/07 2 -7/8" 4 15700 - 15740 C 05/04/02 11111111111♦ � 13355' 7" X 4 -1/2" BKR S -3 PKR, ID = 3.875" I 11111♦ 2 -7/8" 4 15780 - 15820 C 05/03/02 11111 ►11111 2 -7/8" 4 15865 - 15885 C 05/03/02 ► 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1' 13379' 14 -1/2" HES X NIP, ID = 3.813" 1 2 -7/8" 4 15920 - 15940 C 04/29/02 11111111111111 4► ►1 '1' 13399' I—I 4 -1 /2" HES Xn NIP, ID = 3.725" I 2 -3/4" 4 16734 - 17516 C 11/17/98 :::::::::::M, 2 -3/4" 4 19550 - 20450 C 11/17/98 �� , 13411' H4-1/2" WLEG, ID = 3.958" I ► 1 1 1 1 1 1 1 1 1 Si... :44 MN I 13423' H ELMD TT LOGGED 07/30/99 I EZSV I-1 13070' ` lb, 14574' H4-1/2" MARKER JT (20') I 19 -5/8" CSG, 47 #, NT -80S, ID = 8.681" I 14075' r`, 1r 15609' 4 -1/2" MARKER I BKR TIEBACK SLV, ID = 5.25" H 13410' N. JT (19') 4-1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" i-I 13411' 15688' CTM I— TOC 17" X 4 -1/2" BKR ZXP PKR/HGR w /TIEBACK, ID = 4.458" H 13416' MILLED (12/18/08) I All, 17" LNR, 29 #, L -80, MOD, .0371 bpf, ID = 6.184" I 13577' ';;;" ■ BTM OF CMT UNK • • • 4 * r 1 %; PBTD H 20800' 4 -1/2" LNR, 12.6 #, L -80, NSCT, .0152 bpf, ID = 3.958" I—{ 20888' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT r 1990 ORIGINAL COMPLETION 03/22/07 JLJ/TLH GLV C/O WELL: W -12A 11/22/98 JJONES SIDETRACK NABORS 18E 05/03/07 CJA/PJC SET CBP PERMIT No: 1981820 04/02/02 RN/TP CORRECTIONS 05/13/07 JGM /PJC CEMENT PLUG API No: 50- 029 - 22023 -01 05/11/02 JP//LH ADD PERFS 09/17/07 DAV /PJC GLV C/O SEC 21, T11N, R12E, 1542' SNL & 1196' WEL 09/24/05 DAV /TLH FISH PULLED (09/18/04) 01/14/09 CJAISV MILL CMT PLUG (12/18/08) 10/09/05 RPH/TLH WAIVER SFTY NOTE DELETED , BP Exploration (Alaska) • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI~N REPORT OF SUNDRY WELL OPERATIONS RECEI~fE®~~~ JAN 1 2 2009 i 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ ~i TCOiTifl1iSSl Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Extension ®,nchorage Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development r' Exploratory ~~ 198-1820 - 3. Address: P.O. Box 196612 Stratigraphic ~ Service ~~~ 6. API Number: Anchorage, AK 99519-6612 50-029-22023-01-00- 7. KB Elevation (ft): 9. Well Name and Number: 83.67 KB - PBU W-12A 8. Property Designation: 10. Field/Pool(s): ADLO-047452 ~ - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 20888 - feet Plugs (measured) 15050' 5/3/07 true vertical 9049.46 ~ feet Junk (measured) None Effective Depth measured 20800 - feet ~ i., ~~,:.~a~e"~~~,.' ~° ~--~ L `" `~`~`•' true vertical 9036 , feet Casing Length Size MD TVD Burst Collapse Conductor 110 20" Surface - 150' Surface - 150' Surface 2987 13-3/8" 68# L-80 Surface - 3027' Surface - 2684' 5020 2260 Intermediate 12869 9-5/8" 47# NT-80S Surface - 14075' Surface - 8927' 6870 4760 Liner 830 7" 29# L-80 12747' - 13577' 8344' - 8803' 8160 7020 Sidetrack Liner 7478 4-1/2"12.6# L-80 13410' - 20888' 8725' - 9050' 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 SURFACE - 13411' 0 0 - Packers and SSSV (type and measured depth) 9-5/8"X7" BKR ZXP 12754' 7"X4-1/2" BKR S-3 PKR 13335' 7"X4-1/2" BKR ZXP 13416' 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~~ Development - Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ - Gas WAG r GINJ WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pre Title Data Management Engineer Signature Phone 564-4944 Date 1/9/2009 )P Form 10-404 ReJsed 04/2006 f j ; 1 --~ ~ I \ 1 H ~ ~~~ Submit Original Oniy "~, // 1 ~ lJ VV W-12A 198-1820 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base W-12A 11/17/98 PER 16,734. 17,516. 8,933.36 8,977. W-12A 11/17/98 PER 19,550. 20,450. 8,955.02 8,978.34 W-12A 4/29/02 APF 15,865. 15,885. 8,987.35 8,987.43 W-12A 4/29/02 APF 15,920. 15,940. 8,987.68 8,987.89 W-12A 5/3/02 APF 15,780. 15,820. 8,990.26 8,988.29 W-12A 5/4/02 APF 15,700. 15,740. 8,993.83 8,992.11 W-12A 5/5/02 APF 14,255. 14,275. 8,948.11 8,950.36 W-12A 5/5/02 APF 14,950. 14,970. 8,919.21 8,917.91 W-12A 5/3/07 BPS 15,050. 15,055. 8,917.07 8,917.31 W-12A 5/11/07 SQZ 14,000. 15,040. 8,918.22 8,916.67 W-12A 5113/07 SQZ 13,146. 15,040. 8,586.1 8,916.67 W-12A 5/14/07 SQZ 13,500. 15,040. 8,766.82 8,916.67 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • W-12A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 12/15/2008 CTU 9 w. 1.75" Job Scope: Mill Cement «InterAct not Publishing» Tag at ~ 15274' CTM and start milling cement. Continued milling at an average t~Of 25' er/hr to 15406' CTM CH2 called and is pulling all trucks in due to weather conditions. No fluid support. POOH and freeze protect well to 2500' . Lay down ~ equipment until weather breaks. **"Job suspended due to weather"*" ..~. ~_____~_~_____w____ ._ _ _ _. _ __ 12/16/2008~CTU #9 w/1.75" CT. *** Continued from 12/15/08 WSR "** End weather standby from phase 3. Dig out from blow and rig unit back up for milling. **"Continued on 12/17/08 WSR.`*" 3 12/17/2008**** CTU 9 1.75 CT *""" Continued from 12/16/08 WSR **"* Continue snow removal and start equip on coil and test seperator. Inspect Turbo Mill (one slightly chipped button) - «<Interact IS Publishing »> RIH w/ BOT 3.06" OD CC - 3.13" OD DCV ~-3.13" OD Up/Dn Jar - 3.38" OD Disco (7/8 ball)- 3.13" OD C Vlv (3/4 ball) - 2 7/8 Extreme Mud Motor - 3.70" ODTurbo Mill too last mill depth of 15406' on 12/16/08. 'Ta cement at 15394' u and be in millin .Mill to 15600' continue maki progress. Solid returns ~.25 - 1.5 % ---2400 - 4000 bfpd 100% WC - 25 - 35 fph - **"" Continued on 12/17/08 WSR **** 12/18/2008jCTU 9 w/1.75" CT -Mill Cement ""** Continued from 12/17/08 WSR"'"*" (interact 3 broadcasting) -Milling from 15600' to 15688' CTM. ROP slowed to --3FPH. During milling we were able to stack weight on ther bit, pickups were clean at 24K each time and we were able to go right back to the same spot we left off and set down. Decision was made to chase a final Geovis sweep off bottom at 80% all the way to surface and look at the 3.70" OD Turbo mill. At surface with BHA and mill looks NEW with no wear on the face and minor scratches on the sides. While at surface the decision was made not to RBIH until a longer coil string was installed as we only had -8T left on the reel where we left off milling While freeze protecting the wellbore we had good infectivity so we opted to have ASRC test seperator attempt to flow the well while on gas lift before they rigged down the test unit. "*"JOB COMPLETE*** Note: sample of cement cutting returns shows very fine, almost powder results from 3.70" Turbo Scall Mill -Mill had one minor chip on one button, otherwise the paint was still on it. This mill was previously used on a scall milling iob. FLUIDS PUMPED BBLS 55 60/40 METH 50 2% XSKCL/SL 23 GEOVIS 128 Total Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth 10/23/07 NO. 4459 5'~~NED OCT 3 1 2007 Company: State of Alaska Alaska Oil & Gas Cons Gomm Attn: Christine Mahnkel" 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Aurora. Miln!! Pt.,LisburnE Well Job# Loa Description Date BL Color CD F-48 11846815 USIT 1'1 t- (' ./> 10/12/07 1 G-19A 11890315 USIT /9'1- t :) ~ 09/30/07 1 NGI-13 11890313 USIT I )"'T.t'. t --: ~-rAl 09/30/07 1 MPE-30A 11855817 USIT ~Ol-Ot( 10/01/07 1 - F-11 B 11649954 MCNL ~cf-l-/C '-I -# /~5 L3 03/22/07 1 1 W-12A 11418301 MCNL ~~ -1"X'd .. , ~~q 09/10/06 1 1 11-27 11637127 RST j/¡ç lc - I Q"6 it. I "'S-"":}(.., 06/05/07 1 1 02-22A 11216214 MCNL ::IN'I - ,,~ö, 1t J '" "0: .r '":J.- 10/02/06 1 1 01-16 11630486 RST 1?"ir-QO$r"", ~S-t-:ïr 06/28/07 1 1 01-14 11801086 RST / ..-¡ ~ _ {')-:)..? 'It I ~-:'\ -+'-i 07/07/07 1 1 L5-05 11767129 MCNL /1f '-::t -()<.nc:.. it, .ç;Ö 0 06/17/07 1 1 D-21 11626119 RST / "ìr;) - ('I~'::> ..... I ~~$r I 09/12/07 1 1 14-15 11221550 RST 111'1- Ó~L( .,. I"J~ 'Xi } 03/07/06 1 1 D-18A 11695074 RST 01'11- it">"?' 'It- I ~:"I '75 08/28/07 1 1 14-0SA 11813055 RST 1 D¡::) - (,,\U I .. 1~ l5 ~ 06/11107 1 1-23/0-15 11846802 RST d""t(\ IOtL('-/:J-X tt ,< :-5155 08/11/07 1 S-03 11223120 RST 11r1 - /q,' 1!t tf)~~L( 06/13/06 1 1-09A1L-21 11849930 RST I Ö, ~ - (,.qq 1t- I t'\S-"'- 5" 08/04/07 1 1 P2-19A 11649963 MCNL ~')(')+_ ()Id ~ IS-S'":1 d 04/22/07 1 1 OWDW-NW 11211370 RST I J.I\ -" -..n_ $:I. I~S-: ~/ 02/28/06 1 1 K-01 11695073 RST 1~3 - If:) I 'Or /t:>07-ö 08/27/07 1 1 11-32 11630498 RST D¡'-f- I~I .". I~:,,) (,.,~ 09/03/07 1 1 3-25B/L-27 11630490 RST .qÖ~ - f'I:;;) I ....,.-;:-<:7_";(' 07/26/07 1 1 . . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage. AK 99503-2838 Am ""'" â- Received by: C ,,' 12/11/06 Schlumberger NO. 4070 Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Orion Prudhoe Bay Well Job # Log Description Date BL Color CD V-211 40011188 OH EDIT OF MWD/LWD 11/17/04 2 1 $-213A 40011201 OH EDIT OF MWD/LWD 12/11/04 2 1 DS 09-13 11491394 MEM PROD PROFILE 11/24/06 2 14-30A 11485775 MEM PROD PROFILE 11/21/06 2 DS 09-36C 1149225 INJECTION PROFILE 11/23/06 2 W-12A 11418301 MEM PROD PROFILE 09/10/06 2 Y-29A 11485778 MEM PROD PROFILE 11/25/06 2 NK-43 11414407 PROD PROFILE W/DEFT 10/26/06 2 6-13A 11212899 USIT 11/05/06 1 14-3OA 11485775 SCMT 11/22/06 1 DS 02-39L 1 11491395 SCMT 11/25/06 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Ine Petrotechnical Data Center LR2-1 900 E Benson Blvd Anchorage AK 99508-4254 Date Delivered DEC 1 3 20ot) . Received by· ,,~ . ¡C)L[ - I~d STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate _X ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 84 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1541' FNL, 1195' FEL, Sec. 21, T11 N, R12E, UM (asp's 612049, 5944745) W-12A At top of productive interval 9. Permit number / approval number 658' FNL, 2112' FEL, Sec. 33, T11N, R12E, UM (asp's 611299, 5949027) 198-182 At effective depth 10. APl number 4990' FNL, 4153' FEL, Sec. 34, T11 N, R12E, UM (asp's 6614612, 5944745) 50-029-22023-01 At total depth 11. Field / Pool 5018' FNL, 4071' FEL, Sec. 34, T11 N, R12E, UM (asp's 614694, 5944718) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 20888 feet Plugs (measured) true vertical 9049 feet Effective depth: measured 20800 feet Junk (measured) true vertical 9036 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 cf Concrete 150' 150' Surface 2987' 13-3/8" 4338 sx Coldset II 3027' 2684' Intermediate 12869' 9-5/8" 1211 sx Class 'G' 12905' 8434' Liner 830' 7" 151 sx Class 'G' 12747' - 13577' 8344' - 8803' Sidetrack Liner 7478' 4-1/2" 728 sx Class 'G' 13410' - 20888' 8725' - 9050' Perforation depth: measured Open Perfs 14255'-14275', 14950'-14970', 15700'-15740', 15780'-15820', 15865'-15885', Open Perfs (continued) 15920'-15940', 16734'-17516', 19550'-20450' true vertical Open Perfs 8948'-8950', 8919'-8918', 8994'-8992', 8990'-8988', 8987'-8987', 8987'-8987', Open Perfs (continued) 8933'-8977', 8955'-8978' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, TBG @ 13354' MD; 4-1/2", 12.6#, L-80, Tubing Tail @ 13411' MD. ~ I~,!@ 1341 Packers & SSSV(type & measured depth) 7" x4-1/2" BKR 'S' PKR @ 13354'. 7" x4-1/2" BKR ZXP P .',&,SM0..l_J~n~e,~¢ 0'. 4-1/2" HES X Nipple @ 2159' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 04/21/2002 425 460 178 269 Subsequent to operation 05/06/2002 464 475 140 315 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations__ Oil X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~'~~~.~~J~ Title: TechnicalAssistant Date May7, 2002 DeWayne R. Schnorr Prepared b~/DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 04/25/2002 04/28/2002 O4/29/2OO2 O5/O2/2OO2 O5/O3/2OO2 05/04/2002 05/05/2002 O4/25/O2 O4/28/O2 O4/29/O2 O5/O2/O2 O5/O3/02 O5/O4/O2 O5/05/O2 W-12A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PERFORATING PERFORATING PERFORATING PERFORATING PERFORATING PERFORATING PERFORATING :DRIFT/TAG :PERFORATING : PERFORATING :PERFORATING :PERFORATING :PERFORATING :PERFORATING EVENT SUMMARY DRIFTED WITH 3.50" CENTRALIZER. OVERCOME BY DEVIATION @ 13777' WLM. RDMO. RETURNED WELL TO OPER FOR PROD. MIRU CTU #3. RIH WITH PDS 1-11/16" GR/CCL. RUN MEMORY LOG FROM 13300'-16000'. PAINT FLAGS AT 16000' & 15775' CTM. MU 20' SWS GUN (RUN #1), 2-7/8" P J, 4 SPF, RANDOM ORIENT, 60/120 PHASING. SHOOT INTERVAL 15920'-15940'. MU DS WIRELESS CCL DEPTH LOG TOOL AND NEXT 20' SWS GUN #2 (SAME SPECS). SHOT INTERVAL 15865'- 15885'. WAIT ON WEATHER AT SURFACE, PHASE I CONDITIONS - CAN'T USE MANLIFT DUE TO HIGH WINDS. CTU#3 WAIT ON SNOW REMOVAL. RD GUN #2, NOT FIRED. WEEKLY BOP TEST. CHECKS NOT HOLDING PRESSURE, RE-HEAD AND RUN 1-11/16" PDS MEMORY LOG FROM 14100'-16000', FLAG PIPE AT 15900' CTM, POOH. CONTINUE ON 5/3/02 AWGRS. CONTINUE FROM 5/02/02 AWGRS. OOH W/MEM LOGS. RIH W/20' OF 2-7/8' GUN 4 spf, RAND ORIENT., 60/120 PHASING. GUN#2 - SHOT 15865'-15885'. RIH W/GUN #3 SHOOT 15800-15820'. RIH W/GUN#4 (20') SHOOT 15780'-15800'. CHANGE PACKOFFS. CONTINUE ON 5/4/02 AWGRS. CONTINUE FROM 5/3/02 AWGRS. RIH W/GUN RUN #5 (2-7/8" PJ, 4 SPF) SHOOT 15720'-15740'. POOH. RU GUN #6. CHECKS NOT HOLDING. CUT OFF MHA & 50' PIPE. RE-HEAD MHA. MU SWS LOGGING TOOLS. LOG 16K TO 14K. PAINT FLAG @ 15701'. RIH W/GUN RUN #6 (2-7/8" P J) SHOOT 15700'-15720'. POOH. CONTINUE ON 5/5/02 AWGRS. CONTINUE FROM 5/4/02 AWGRS. RIH W/GUN RUN #7 (2-7/8" P J, 4SPF), SHOOT 14950'-14970'. RU GUN #8 (2-7/8" PJ, 4SPF), SHOOT 14,255'-14,275'. POOH. AT SURFACE. ***JOB COMPLETE, WELL LEFT FLOWING*** Page 1 W-12A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS Fluids Pumped BBLS 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 0 TEST) 208 60/40 METHANOL WATER 155 METHANOL 355 1% KCL WATER 718 TOTAL ADD PERFS 04/29/2002 - 05/05/2002 THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2-7/8" PJ 4 SPF, 60/120 DEGREE PHASING, RANDOM ORIENTATION. 14255'-14275' 14950'-14970' 15700'-15740' 15780'-15820' 15865'-15885' 15920'-15940' Page 2 STATE OF ALASKA "'--'- ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging_ Perforate_ Acidize Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 1541' FNL, 1195' FEL, Sec. 21, TllN, R12E, UM At top of productive interval 658' FNL, 2112' FEL, Sec. 33, T11N, R12E, UM At effective depth 290' FSL, 1126' FWL, Sec. 34, T11N, R12E, UM At total depth 216' FSL, 1208' FWL, Sec. 34, T11N, R12E, UM 5. Type of Well: Development __X Explorato~__ Stratigraphic__ Service__ (asp's 612049, 5944745) (asp's 611299, 5949027) (asp's 614612, 5944745) (asp's 614694, 5944718) 6. Datum elevation (DF or KB feet) RKB 84 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-12A 9. Permit number / approval number 198-182 10. APl number 50-029-22023-01 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 20888 feet Plugs (measured) 9049 feet Effective depth: measured true vertical Casing Length Conductor 110' Surface 2987' Production 12869' Liner 830' Sidetrack Liner 7478' 20800 feet Junk (measured) 9036 feet Size Cemented Measured Depth True Vertical Depth 20" x 30" 72 c.f. concrete 150' 150' 13-3/8" 4338 sx Coldset II 3027' 2684' 9-5/8" 1211 sx Class 'G' 12905' 8434' 7" 151 sx Class 'G' 12747' - 13577' 8344' - 8803' 4-1/2" 728 sx Class 'G' 13410' - 20888' 8725' - 9050' Perforation depth: measured Open Perfs 16734' - 17516', 19550' - 20450' true vertical Open Perfs 8933' - 8977', 8955' - 8978' Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) RECEIVED 200I 4-1/2" 12.6#, L-80 TBG ~ 13354'. Tubing Tail to 13411'. ~~ 7" x 4-1/2" BKR 'S' PKR ~ 13354'. 7" x 4-1/2" BKR ZXP PKR & HMC Liner HGR ~ 13410' 4-1/2" HES X-Nipple ~ 2159'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 10/12/2001 Subsequent to operation 10/22/2001 Oil-Bbl 422 Representative Daily Averaqe Production or Iniection Data GasoMcf Water-Bbl 358 115 Casing Pressure Tubing Pressure GL 264 1074 864 372 GL 265 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ ~~_~~~, Title: PadW Petroleum Engineer Beverly Luedke-Chan Date November 20, 2001 Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · ORIGINAL SUBMIT IN DUPLICATE 09/24/2001 10/14/2001 10/15/2001 W-12A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS SBHP/FBHP SURVEY: STATIC SURVEY ACID: ACID PICKLE ACID: ACID TREATMENT W/DIVERTER EVENT SUMMARY 09/24/01 RUN SBHPS W/TANDEM PETREDAT GAUGES. STOP DUE TO DEVIATION @ 13870' CORR MD. AVERAGE PRESSURE @ 8200' SS = 2793 PSI. WELL RETURNED TO PAD OPER. 10/14101 RU DS PUMP MEOH/WATER SPEAR 24 BBL 50/50 DIESEL/XYLENE 24 BBLS 12% DAD ACID FOLLOWED BY 190 BBLS CRUDE @ 5 BPM. DID NOT CATCH PSI UNTIL LAST 90 BBLS CRUDE. 10/15/01 PUMPED 350 BBL COOL DOWN STAGE FOLLOWED BY 2 12% DAD ACID (3000 GAL) STAGES AND 2 WAX DIVERTER W/HEC AND BREAKER STAGES (800#). OVERFLUSHED BY 50 BBLS 2% KCL. AVE RT=5 BPM AVE PSI=400 PSI. WELL LEFT SHUT IN FOR 6 HOURS. FLUIDS PUMPED BBLS 25 METHANOL 775 2% KCL WATER 22 DIESEL 177 CRUDE 12 XYZLENE 72 12% DAD ACID 24 ACID 11 O7 TOTAL Page 1 198-182-0 PRUDHOE BAY UNIT W-12A 50- 029-22023-01 Bi' EXPLORATION Roll #1: Start: Stop Roll #2: Start Stop (ALASKA) INC MD 20888 TVD 00000 Completion Date: 11/20/98 Completed Status: 1-OIL Current: Name Interval Sent Received T/C/D ~/FINAL 12650-20680 L CBL CH 5 12/17/98 1/5/99 L CDR/IMP-MD ~./'FINAL 12896-20888 OH 3/18/99 3/26/99 L CDR/IMP-TVD ~/FINAL 8428-9049 OH 3/18/99 3/26/99 L USIT ,///FINAL BL(C) 12650-20718 CH 5 12/1/98 12/3/98 R SRVY RPT j SCHLUM 12896.70-20888. OH 12/16/98 12/18/98 T 9021 ~//1 SCHLUM USIT/CBL CH 3/10/99 3/11/99 T 9030 ~1-7 SCHLUM GR/IMP OH 3/18/99 3/26/99 Tuesday, January 09, 2001 Page 1 of 1 STATE OF ALASKA ALASKA ,._:_ -~ AND GAS CONSERVATION COM_...:~.SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown J~ Stimulate [] Plugging [] Perforate [] Pull Tubing'iq Alter Casing lq Repair Well []Other 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 I¢Typ e ~.,~well: . . ,lz~uevelopmen~ [] Exploratory [] Stratigraphic [] Service · 4. Location of well at surface 1542' SNL, 1196' WEL, SEC. 21, T11 N, R12E, UM At top of productive interval 657' SNL, 2090' WEL, SEC. 33, T11 N, R12E, UM At effective depth At total depth 5017' SNL, 1240' EWL, SEC. 34, T11N, R12E, UM 6. Datum Elevation (DF or KB) KBE = 83.67' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-12A 9. Permit Number / Approval No. 198-182 10. APl Number 50- 029-22023-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 20888 feet true vertical 9049 feet Effective depth: measured 20800 feet true vertical 9036 feet Casing Length Structural Conductor 110' Surface 2990' Intermediate 13446' Production Liner 866' Size Plugs (measured) Junk (measured) Cemented 20" 13-3/8" 4338 sx Coldset II 9-5/8" 1211 sx Class 'G' 5-1/2" 250 sx Class 'G' MD TVD 147' 147' 3027' 3027' 13483' 8792' 13209'-14075' 8620'-9180' Perforation depth: measured true vertical 13715'-13744', 13747'-13766', 13769'-13778', 13780'-13785', 13795'-13824', 13827'-13846' subsea 8852'-8938'(sixintervals) Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 13411' Packers and SSSV (type and measured depth) Packer @ 13355' SSSV @ 2159' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run ~.O [] Daily Report of Well Operatzijpns __il [] Gas [] Suspended 17. I hereby c_.¢r-t~y~{t thcCore, l~,el/ng is true. an,¢ c. orrect to the best of my knowledge I(,liohael ~N!!!!_a.__rns . ~'"Z-.~...¢...,~-~_ ._ Ti~.le ~c_n_?i~a! A~is~_a.n~ IV __ ServicL~'~n Prepared By Name/Numben Form 10-404 Rev. 06/15/88 Submit In Duplicate W-12A DESCRIPTION OF WORK COMPLETED Stimulation Operation O9/28/99 A Acid Stimulation Treatment was performed using the following fluids: SUMMARY Miru Dowell CTU #2. Loaded well with 400 bbls 2% KCI water. With end of coil at 14100' pumped 3000 gal 12/10 HCl/Xylene (bullhead). Overdisplaced acid 100 bbls into formation. Layed in 2000 gals 12% HCl (for pickle) while POH. Well on vacuum throughout. RDMO. Contacted PCC and pad operator to POP well. Fluids Pumped BBLS. Description 631 Freshwater w/2% KCl. 72 12%/10% HCI/Xylene 48 12% HCI 35 Meoh. 786 Total Pumped 3/18/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 Al"tN: Sherrie NO. 12447 Company: Alaska Oil & Gas Cons Camm ( Attn: Lori Taylor I' 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL Sepia Tape W-12A ~ ~0'~ 99094 GR & IMPULSE MWD 981110 1 W-12A 99094 CDR/IMPULSE MWD 981110 1 1 W-12A 99094 CDR/IMPULSE TVD 981110 1 1 , , , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: RECEIVED BP Explorotion (Alaska) Inc, Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-661 & Schlumberger GeoQuest 3940 Arctic BIvd Anchorage, AK 99503 Al-tN: Sherrie Received by: 3/10/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 Al'tN: Sherrie NO. 12419 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) LIS Well Job # Log Description Date Blueline Sepia Tape E-14A ~ {::;1~ ~ 99116 MCNL 971019 1 1 i W-12A ~ ~,.~(~ 99122 GRUSITCBT(PDC) 981115 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Bivd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, A~~ 12/17~98 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 A1TN: Sherrle NO. 12176 Company Alaska Oil & Gas Cons Comm Attn: Lorl Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Color Well Job # Log Description Date Print Blueline Sepia LIS Tape B-4 PRODUCTION PROFILE 981202 i 1 B- 12A PRODUCTION PROFILE 981104 1 1 B-25 PRODUCTION PROFILE 981105 1 1 F-08 PRODUCTION PROFILE 981102 1 1 N-17 PRODUCTION PROFILE 981111 1 1 W-12A CEMENT BOND TOOL 981115 1 1 W- 19 GR/COLLAR CORRELATION 981129 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: ~. u,,~s ~.,ons. Commission Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 / / STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [~ Oil I~ Gas I---I Suspended I~ Abandoned E~ Service i2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-182 13. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22023-01 14. Location of well at surface ~~.¢-~.~ 9. Unit or Lease Name 1542'SNL, 1196'WEL, SEC. 21,T11N, R12E, UM " '~"~" ;:i:ii'i!i ~' ~i ~~-~ ' Prudhoe Bay Unit At top of productive interval ~///~~'" ~ ii . 10. Well Number 657' SNL, 2090' WEL, SEC. 33, T11N, R12E, UM : i~ , W-12A At total depth '. "_~_'~ i ~'~.~.,-.~ ~ 11 Field and Pool 5017' SNL, 1240' EWL, SEC. 34, T11N, R12E, UM ;:(~ ,~,¢,~,,,.~ ' Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 83.67'I ADL 047452 12. Date Spudded10/8/98 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if OffshOre 116' NO' Of cOmpletiOns11/8/98 11/20/98 N/A MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 20888 9049 FT 20800 9036 FTI [~Yes E~NoI (Nipple) 2159' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, DIR, RES, CBL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'I-rOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 13-3/8" 68# Butt 40' 3027' 17-1/2" 4338 sx Coldset II 9-5/8" 47# NSCC 36' 12905' 12-1/4" 1211 sx Class 'G' 7" 26# L-80 12747' 13577' 8-1/2" 151 sx Class 'G' 4-1/2" 12.6# L-80 13410' 20888' 6" 728 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6, L-80 13411' 13355' MD TVD MD TVD 16734'- 17516' 8933' - 8977' 19550' - 20450' 8955' - 8978' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 152 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) December 11, 1998I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO '.TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wat~ '.8'_ul~Cni~Core~.dhlP~ Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 13533' 8782' Shublik 13580' 8804' Sadlerochit 13880' 8905' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoi'ng is true and correct to the best of my knowledge Signed ~-----------~.__..~.~. ~ ~2./,4,! ~ Dan Stone Title Engineering Supervisor Date W-12A 98-182 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 29 Sep 98 30 Sep 98 01 Oct 98 02 Oct 98 03 Oct 98 04 Oct 98 05 Oct 98 06 Oct 98 PB W Pad Progress Report Well W- 12A Page Date Duration Activity 17:00-18:30 18:30-22:30 22:30-03:30 03:30-06:00 06:00-06:30 06:30-13:00 13:00-15:30 15:30-00:00 00:00-04:30 04:30-06:00 06:00-08:30 08:30-09:30 09:30-11:00 11:00-13:00 13:00-14:30 14:30-16:00 16:00-17:00 17:00-19:00 19:00-23:00 23:00-02:30 02:30-06:00 06:00-17:30 17:30-19:00 19:00-23:00 23:00-06:00 06:00-07:00 07:00-07:30 07:30-08:30 08:30-09:30 09:30-10:00 10:00-10:30 10:30-15:00 15:00-15:30 15:30-16:00 16:00-21:00 21:00-22:00 22:00-23:30 23:30-05:00 05:00-06:00 06:00-11:00 11:00-14:00 14:00-19:00 19:00-22:00 22:00-23:00 23:00-01:00 O1:00-06:00 06:00-07:30 07:30-09:00 09:00-10:00 10:00-14:30 14:30-06:00 06:00-14:00 14:00-19:00 19:00-01:00 1-1/2 hr 4hr 5hr 2-1/2 hr 1/2 hr 6-1/2 hr 2-1/2 hr 8-1/2 hr 4-1/2 hr 1-1/2 hr 2-1/2 hr lhr 1-1/2 hr 2hr 1-1/2 hr 1-1/2 hr lhr 2 hr 4hr 3-1/2 hr 3-1/2 hr 11-1/2 hr 1-1/2 hr 4hr 7hr lhr 1/2 hr 1 hr lhr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 5hr lhr 1-1/2 hr 5-1/2 hr lhr 5hr 3 hr 5hr 3 hr lhr 2 hr 5 hr 1-1/2 hr 1-1/2 hr lhr 4-1/2 hr 15-1/2 hr 8 hr 5 hr 6 hr Removed Hanger plug Rigged up High pressure lines Repaired Fluid system Circulated at 13125.0 ft Reverse circulated at 13125.0 ft Circulated at 13125.0 ft Installed Hanger plug Installed BOP stack Tested BOP stack Removed Hanger plug Circulated at 13120.0 ft Removed Tubing hanger Removed Flowline Installed Flowline Retrieved Tubing hanger Set Retrievable packer at 60.0 ft with 0.0 psi Retrieved Seal assembly Removed Tubing head spool Installed Seal assembly Retrieved Tubing landing string Laid down 600.0 ft of Tubing Laid down 13097.0 ft of Tubing Rigged down Tubing handling equipment Conducted electric cable operations Conducted electric cable operations Set downhole equipment (wireline) Tested Casing Retrieved Wear bushing Installed Well control Tested BOP stack Installed Wear bushing Ran Drillpipe to 6520.0 ft (5in OD) Tested Kelly cocks Circulated at 6520.0 ft Ran Drillpipe to 13070.0 ft (5in OD) Circulated at 13066.0 ft Held safety meeting Circulated at 13066.0 ft Laid down 850.0 ft of 5in OD drill pipe Pulled Drillpipe in stands to 0.0 ft Made up BHA no. 1 R.I.H. to 12905.0 ft Milled Other sub-surface equipment at 12905.0 ft Jarred stuck pipe at 12905.0 ft Circulated at 12905.0 ft Pulled Drillpipe in stands to 0.0 ft Retrieved Casing cutter R.I.H. to 3000.0 ft Serviced Block line R.I.H. to 12905.0 ft Milled Casing cutter at 12935.0 ft Milled Casing at 12965.0 ft Circulated at 12965.0 ft Pulled out of hole to 0.0 ft 1 02 December 98 Facility Date/Time 07 Oct 98 08 Oct 98 09 Oct 98 10 Oct 98 11 Oct 98 12 Oct 98 13 Oct 98 PB W Pad Progress Report Well W- 12A Rig (null) Duration Activity O1:00-02:00 02:00-06:00 06:00-09:00 09:00-10:30 10:30-12:30 12:30-13:00 13:00-14:00 14:00-17:30 17:30-22:30 22:30-23:30 23:30-03:00 03:00-03:30 03:30-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-18:00 18:00-06:00 06:00-06:00 06:00-09:00 09:00-10:30 10:30-11:00 11:00-12:00 12:00-12:30 12:30-14:00 14:00-16:00 16:00-17:00 17:00-18:30 18:30-20:00 20:00-21:30 21:30-00:00 00:00-00:45 00:45-06:00 06:00-08:30 08:30-09:30 09:30-13:00 13:00-18:00 18:00-04:00 04:00-05:00 05:00-06:00 06:00-08:30 08:30-09:00 09:00-11:00 11:00-16:00 16:00-18:30 18:30-22:00 22:00-23:00 23:00-03:30 03:30-05:00 05:00-06:00 06:00-07:00 07:00-10:45 10:45-12:00 12:00-13:00 lhr 4hr 3hr 1-1/2 hr 2hr 1/2 hr lhr 3-1/2 hr 5 hr 1 hr 3-1/2 hr 1/2 hr 2-1/2 hr 6 hr 1/2 hr 1-1/2 hr 4hr 12hr 24 hr 3hr 1-1/2 hr 1/2 hr lhr 1/2 hr 1-1/2 hr 2hr 1 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 3/4 hr 5-1/4 hr 2-1/2 hr lhr 3-1/2 hr 5 hr lOhr 1 hr lhr 2-1/2 hr 1/2 hr 2 hr 5 hr 2-1/2 hr 3-1/2 hr 1 hr 4-1/2 hr 1-1/2 hr lhr lhr 3-3/4 hr 1-1/4 hr 1 hr Tested BOP stack Ran Drillpipe in stands to 6150.0 ft Ran Drillpipe in stands to 12805.0 ft Washed to 13058.0 ft Circulated at 13058.0 ft Held safety meeting Mixed and pumped slurry - 35.000 bbl Circulated at 12318.0 ft Pulled Drillpipe in stands to 0.0 ft Serviced BOP stack Tested BOP stack Performed cement integrity test Made up BHA no. 2 R.I.H. to 12667.0 ft Held drill (Kick (well kill)) Tested LWD tool - Via string Drilled cement to 12905.0 ft Drilled to 12954.0 ft Drilled to 13458.0 ft Drilled to 13515.0 ft Circulated at 13515.0 ft Drilled to 13520.0 ft Circulated at 13520.0 ft Drilled to 13526.0 ft Circulated at 13526.0 ft Drilled to 13560.0 ft Circulated at 13560.0 ft Drilled to 13579.0 ft Circulated at 13579.0 ft Pulled BHA Circulated at 13579.0 ft Pulled out of hole to 12905.0 ft Pulled out of hole to 0.0 ft Pulled BHA Rigged up Casing handling equipment Ran Liner to 800.0 ft (7in OD) Rig waited: Equipment Ran Liner in stands to 12905.0 ft Circulated at 12905.0 ft Ran Liner to 13300.0 ft (7in OD) Ran Drillpipe in stands to 13200.0 ft Pulled Drillpipe in stands to 12905.0 ft Circulated at 12905.0 ft Pulled Drillpipe in stands to 840.0 ft Laid down 840.0 ft of Liner Made up BHA no. 3 Serviced Block line R.I.H. to 12905.0 ft Circulated at 12905.0 ft R.I.H. to 13347.0 ft Laid down 310.0 ft of 5in OD drill pipe Reamed to 13389.0 ft Jarred stuck pipe at 13337.0 ft Pumped out of hole to 12885.0 ft Page 2 Date 02 December 98 Facility Date/Time 14 Oct 98 15 Oct 98 16 Oct 98 17 Oct 98 18 Oct 98 19 Oct 98 PB W Pad 13:00-16:00 16:00-20:00 20:00-20:15 20:15-22:30 22:30-00:30 00:30-05:00 05:00-06:00 06:00-11:00 11:00-12:00 12:00-21:00 21:00-22:00 22:00-01:30 01:30-02:30 02:30-04:00 04:00-06:00 06:00-09:30 09:30-10:00 10:00-19:00 19:00-06:00 06:00-07:30 07:30-10:30 10:30-16:30 16:30-18:00 18:00-03:00 03:00-06:00 06:00-08:45 08:45-09:00 09:00-09:15 09:15-10:30 10:30-11:00 11:00-13:15 13:15-13:45 13:45-16:00 16:00-17:30 17:30-18:30 18:30-22:00 22:00-00:00 00:00-00:30 00:30-01:00 01:00-03:00 03:00-06:00 06:00-07:15 07:15-07:45 07:45-12:30 12:30-13:30 13:30-17:30 17:30-19:30 19:30-20:15 20:15-20:30 20:30-23:00 23:00-00:00 00:00-00:45 00:45-01:15 01:15-02:15 Duration 3hr 4hr 1/4 hr 2-1/4 hr 2 hr 4-1/2 hr 1 hr 5hr 1 hr 9hr lhr 3-1/2 hr lhr 1-1/2 hr 2hr 3-1/2 hr 1/2 hr 9hr llhr 1-1/2 hr 3 hr 6hr 1-1/2 hr 9hr 3hr 2-3/4 hr 1/4 hr 1/4 hr 1-1/4 hr 1/2 hr 2-1/4 hr 1/2 hr 2-1/4 hr 1-1/2 hr lhr 3-1/2 hr 2 hr 1/2 hr 1/2 hr 2 hr 3 hr 1-1/4 hr 1/2 hr 4-3/4 hr lhr 4hr 2 hr 3/4 hr 1/4hr 2-1/2 hr lhr 3/4 hr 1/2 hr lhr Progress Report Well W- 12A Rig (null) Page Date Activity Circulated at 12885.0 ft Pulled out of hole to 842.0 fl Flow check Pulled BI-IA Made up BHA no. 4 R.I.H. to 12905.0 ft Circulated at 12905.0 ft Circulated at 12905.0 ft Singled in drill pipe to 13058.0 ft Reamed to 13348.0 ft Reamed to 13348.0 ft Reamed to 13440.0 ft Circulated at 13440.0 ft Pumped out of hole to 13088.0 ft Circulated at 13088.0 ft Circulated at 13088.0 ft Laid down 180.0 ft of 5in OD drill pipe Circulated at 12905.0 ft Reamed to 13300.0 ft Pumped out of hole to 13245.0 ft Reamed to 13300.0 ft Reamed to 13414.0 ft Circulated at 13414.0 ft Reamed to 13579.0 ft Circulated at 13579.0 ft Circulated at 13579.0 ft Flow check Pulled out of hole to 13370.0 ft Pulled out of hole to 13325.0 ft Pulled out of hole to 12851.0 ft Circulated at 12851.0 ft R.I.H. to 13579.0 ft Circulated at 13579.0 ft Pulled out of hole to 13324.0 ft Circulated at 12190.0 ft Pulled out of hole to 732.0 ft Pulled BHA Held safety meeting Installed Casing handling equipment Ran Liner to 760.0 ft (7in OD) Ran Drillpipe in stands to 3100.0 ft Ran Drillpipe in stands to 4000.0 ft Circulated at 4000.0 ft Ran Drillpipe in stands to 8012.0 ft Circulated at 8012.0 ft Ran Drillpipe in stands to 12819.0 ft Circulated at 12819.0 ft Ran Drillpipe in stands to 13571.0 ft Washed to 13579.0 ft Circulated at 13579.0 ft Mixed and pumped slurry - 41.000 bbl Displaced slurry - 236.000 bbl Functioned Tie back packer Reverse circulated at 12756.0 fi 3 02 December 98 Facility Date/Time 20 oct 98 21 oct 98 22 oct 98 23 Oct 98 24 oct 98 25 Oct 98 26 Oct 98 PB W Pad 02:15-05:30 05:30-06:00 06:00-09:00 09:00-14:00 14:00-17:30 17:30-20:30 20:30-01:30 01:30-02:30 02:30-06:00 06:00-07:00 07:00-09:00 09:00-11:00 11:00-15:00 15:00-16:00 16:00-17:00 17:00-19:00 19:00-19:30 19:30-06:00 06:00-00:00 00:00-01:30 01:30-02:00 02:00-02:15 02:15-06:00 06:00-09:00 09:00-10:00 10:00-13:30 13:30-14:30 14:30-16:00 16:00-20:00 20:00-20:30 20:30-21:00 21:00-21:30 21:30-22:00 22:00-06:00 06:00-06:00 06:00-11:15 11:15-13:00 13:00-19:30 19:30-20:15 20:15-21:00 21:00-21:30 21:30-01:00 01:00-06:00 06:00-07:00 07:00-08:00 08:00-12:30 12:30-17:30 17:30-18:00 18:00-01:00 01:00-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-07:00 Duration 3-1/4 hr 1/2 hr 3 hr 5hr 3-1/2 hr 3 hr 5hr lhr 3-1/2 hr lhr 2hr 2 hr 4hr 1 hr 1 hr 2 hr 1/2 hr 10-1/2 hr 18hr 1-1/2 hr 1/2 hr 1/4 hr 3-3/4 hr 3 hr lhr 3-1/2 hr lhr 1-1/2 hr 4hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 8hr 24 hr 5-1/4 hr 1-3/4 hr 6-1/2 hr 3/4 hr 3/4 hr 1/2 hr 3-1/2 hr 5hr 1 hr 1 hr 4-1/2 hr 5 hr 1/2 hr 7 hr 2-1/2 hr 1-1/2 hr lhr 1/2 hr 1/2 hr Progress Report Well W- 12A Rig (null) Page Date Activity Laid down 3025.0 ft of 5in OD drill pipe Pulled Drillpipe in stands to 9257.0 ft Laid down 9257.0 ft of 5in OD drill pipe Tested BOP stack Made up BHA no. 5 Singled in drill pipe to 3429.0 ft R.I.H. to 13402.0 ft Drilled cement to 13493.0 ft Circulated at 13493.0 ft Circulated at 13493.0 ft Tested Casing - Via annulus and string Drilled cement to 13560.0 ft Circulated at 13560.0 ft Drilled installed equipment - Float shoe Drilled to 13600.0 ft Circulated at 13600.0 ft Performed formation integrity test Drilled to 13780.0 ft Drilled to 14191.0 ft Circulated at 14191.0 ft Pulled out of hole to 12746.0 ft Flow check Pulled out of hole to 5821.0 ft Pulled out of hole to 451.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 3714.0 ft Serviced Block line R.I.H. to 13580.0 ft Circulated at 13580.0 ft R.I.H. to 14098.0 ft Functioned Survey instruments Reamed to 14191.0 ft Drilled to 14414.0 ft Drilled to 15054.0 ft Drilled to 15131.0 ft Circulated at 15131.0 ft Circulated at 15131.0 ft Pulled Drillpipe in stands to 14038.0 ft Ran Drillpipe in stands to 15131.0 ft Circulated at 15131.0 ft Laid down 5022.0 ft of 5in OD drill pipe Pulled Drillpipe in stands to 0.0 ft Made up BHA no. 7 R.I.H. to 3620.0 ft Singled in drill pipe to 8748.0 ft R.I.H. to 15100.0 ft Circulated at 15131.0 ft Drilled to 15304.0 fi Circulated at 15304.0 ft Circulated at 15304.0 ft Pulled out of hole to 13.0 ft Pulled out of hole to 13579.0 ft Circulated at 13579.0 ft 4 02 December 98 Facility Date/Time 27 Oct 98 28 Oct 98 29 Oct 98 30 Oct 98 31 Oct 98 01 Nov 98 02 Nov 98 03 Nov 98 04 Nov 98 05 Nov 98 06 Nov 98 07 Nov 98 PB W Pad Progress Report Well W- 12A Rig (null) Page Date 07:00-12:00 12:00-12:30 12:30-17:30 17:30-20:00 20:00-02:30 02:30-03:00 03:00-06:00 06:00-16:00 16:00-17:30 17:30-06:00 06:00-15:30 15:30-16:30 16:30-18:00 18:00-19:30 19:30-03:00 03:00-06:00 06:00-07:00 07:00-17:00 17:00-18:00 18:00-03:30 03:30-05:00 05:00-06:00 06:00-08:30 08:30-09:30 09:30-13:00 13:00-13:30 13:30-06:00 06:00-20:30 20:30-22:00 22:00-03:00 03:00-05:30 05:30-06:00 06:00-01:00 01:00-01:30 01:30-03:00 03:00-04:30 04:30-06:00 06:00-14:30 14:30-18:30 18:30-20:30 20:30-04:30 04:30-06:00 06:00-06:00 06:00-13:30 13:30-14:00 14:00-19:30 19:30-06:00 06:00-09:00 09:00-13:00 13:00-16:00 16:00-17:00 17:00-06:00 06:00-06:00 06:00-11:30 Duration 5hr 1/2 hr 5 hr 2-1/2 hr 6-1/2 hr 1/2 hr 3hr 10hr 1-1/2 hr 12-1/2 hr 9-1/2 hr 1 hr 1-1/2 hr 1-1/2 hr 7-1/2 hr 3hr lhr 10hr lhr 9-1/2 hr 1-1/2 hr lhr 2-1/2 hr 1 hr 3-1/2 hr 1/2 hr 16-1/2 hr 14-1/2 hr 1-1/2 hr 5hr 2-1/2 hr 1/2 hr 19hr 1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr 8-1/2 hr 4hr 2 hr 8 hr 1-1/2 hr 24 hr 7-1/2 hr 1/2 hr 5-1/2 hr 10-1/2 hr 3 hr 4hr 3 hr lhr 13hr 24 hr 5-1/2 hr Activity Pulled out of hole to 455.0 ft Pulled BHA Tested BOP stack Made up BHA no. 8 R.I.H. to 15240.0 ft Took MWD survey at 15270.0 ft Drilled to 15420.0 ft Drilled to 15682.0 ft Took MWD survey at 15682.0 ft Drilled to 16138.0 ft Drilled to 16369.0 ft Circulated at 16369.0 ft Pulled out of hole to 15200.0 ft Reamed to 16369.0 ft Drilled to 16527.0 ft Tested M.W.D. tool - Via annulus Tested M.W.D. tool - Via annulus and string Drilled to 16684.0 ft Circulated at 16684.0 ft Pulled out of hole to 0.0 ft Made up BHA no. 9 R.I.H. to 1500.0 ft R.I.H. to 8800.0 ft Serviced Block line R.I.H. to 16634.0 ft Reamed to 16684.0 ft Drilled to 17025.0 ft Drilled to 17393.0 ft Pulled out of hole to 16036.0 ft Drilled to 17539.0 ft Circulated at 17539.0 ft Drilled to 17549.0 ft Drilled to 18021.0 ft Circulated at 18021.0 ft Drilled to 18083.0 ft Circulated at 18083.0 ft Pulled out of hole to 16000.0 ft Pulled BHA Tested All rams Made up BHA no. 10 R.I.H. to 18083.0 ft Drilled to 18112.0 ft Drilled to 18773.0 ft Drilled to 18960.0 ft Circulated at 18960.0 ft Pulled out of hole to 16188.0 ft Drilled to 19211.0 ft Drilled to 19286.0 ft Circulated at 19286.0 ft Pulled Drillpipe in stands to 17257.0 ft Ran Drillpipe in stands to 19286.0 ft Drilled to 19589.0 ft Drilled to 20186.0 ft Drilled to 20314.0 ft 5 02 December 98 Facility Date/Time 08 Nov 98 09 Nov 98 10 Nov 98 11 Nov 98 12 Nov 98 13 Nov 98 Progress Report PB W Pad Well W-12A Page 6 Rig (null) Date 02 December 98 11:30-12:00 12:00-13:15 13:15-06:00 06:00-11:00 11:00-16:00 16:00-17:00 17:00-19:30 19:30-23:00 23:00-00:30 00:30-05:00 05:00-06:00 06:00-09:30 09:30-13:30 13:30-21:30 21:30-00:00 00:00-00:15 00:15-06:00 06:00-07:00 07:00-08:30 08:30-12:00 12:00-13:00 13:00-15:00 15:00-16:00 16:00-04:00 04:00-04:30 04:30-06:00 06:00-08:30 08:30-09:00 09:00-14:00 14:00-18:00 18:00-18:15 18:15-19:30 19:30-20:00 20:00-20:30 20:30-20:45 20:45-22:00 22:00-22:30 22:30-00:00 00:00-05:00 05:00-05:15 05:15-06:00 06:00-08:30 08:30-10:00 10:00-11:30 11:30-12:00 12:00-12:15 12:15-12:30 12:30-16:00 16:00-16:15 16:15-16:30 16:30-17:00 17:00-17:30 17:30-03:30 03:30-04:00 Duration 1/2 hr 1-1/4 hr 16-3/4 hr 5hr 5 hr 1 hr 2-1/2 hr 3-1/2 hr 1-1/2 hr 4-1/2 hr 1 hr 3-1/2 hr 4 hr 8 hr 2-1/2 hr 1/4 hr 5-3/4 hr lhr 1-1/2 hr 3-1/2 hr lhr 2hr lhr 12 hr 1/2 hr 1-1/2 hr 2-1/2 hr 1/2 hr 5hr 4hr 1/4 hr 1-1/4 hr 1/2 hr 1/2 hr 1/4 hr 1-1/4 hr 1/2 hr 1-1/2 hr 5hr 1/4 hr 3/4 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/4 hr 1/4 hr 3-1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 10hr 1/2 hr Activity Circulated at 20314.0 ft Pulled out of hole to 19324.0 ft Drilled to 20745.0 ft Drilled to 20888.0 ft Circulated at 20888.0 ft Pulled out of hole to 19200.0 ft Circulated at 19200.0 ft Pulled out of hole to 13577.0 ft Circulated at 13577.0 ft R.I.H. to 20565.0 ft Washed to 20603.0 ft Logged hole with LWD: DIR/FE from 20633.0 ft to 20888.0 ft Circulated at 20888.0 ft Held safety meeting Circulated at 20888.0 ft Flow check Pulled out of hole to 12000.0 ft Pulled out of hole to 8770.0 ft (cont...) Circulated at 8770.0 ft Laid down 6525.0 ft of 4in OD drill pipe Pulled out of hole to 250.0 ft Pulled BHA Held safety meeting Ran Liner to 7584.0 ft (4-1/2in OD) Circulated at 7584.0 ft Ran Liner on landing string to 11000.0 ft Ran Liner on landing string to 13546.0 ft (cont...) Circulated at 13546.0 ft Ran Liner on landing string to 20888.0 ft Circulated at 20888.0 ft Held safety meeting Batch mixed slurry - 200.000 bbl Pumped Water based mud spacers - volume 50.000 bbl Mixed and pumped slurry - 196.000 bbl Cleared Cement pump Displaced slurry - 327.000 bbl Held 4200.0 psi pressure on 0.000 bbl squeezed cement Circulated at 13400.0 ft Reverse circulated at 13400.0 ft Removed Cement head Pulled Drillpipe in stands to 13400.0 ft Pulled Drillpipe in stands to 6000.0 ft (cont...) Serviced Block line Pulled Drillpipe in stands to 0.0 ft Rigged down Handling equipment Retrieved Wear bushing Installed Hanger plug Tested BOP stack Retrieved Hanger plug Installed Wear bushing Tested Casing head Installed Wireline units Conducted electric cable operations Rigged down Wireline units Facility Date/Time 14 Nov 98 15 Nov 98 16 Nov 98 17 Nov 98 18 Nov 98 Progress Report PB W Pad Well W-12A Page 7 Rig (null) Date 02 December 98 04:00-06:00 06:00-06:30 06:30-14:30 14:30-20:30 20:30-23:30 23:30-03:30 03:30-06:00 06:00-06:15 06:15-11:30 11:30-12:00 12:00-13:45 13:45-14:00 14:00-22:00 22:00-23:00 23:00-03:00 03:00-04:00 04:00-06:00 06:00-18:00 18:00-05:30 05:30-06:00 06:00-07:30 07:30-09:30 09:30-12:30 12:30-15:00 15:00-15:30 15:30-16:30 16:30-17:00 17:00-22:00 22:00-02:00 02:00-02:45 02:45-06:00 06:00-10:00 10:00-11:00 11:00-11:15 11:15-12:00 12:00-13:45 13:45-14:00 14:00-14:15 14:15-16:15 16:15-16:30 16:30-23:00 23:00-23:30 23:30-03:00 03:00-03:30 03:30 06:00-07:00 07:00-07:30 07:30-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-18:45 18:45-19:00 19:00-19:30 Duration 2 hr 1/2 hr 8 hr 6 hr 3hr 4 hr 2-1/2 hr 1/4hr 5-1/4 hr 1/2 hr 1-3/4 hr 1/4 hr 8hr 1 hr 4hr lhr 2hr 12hr 11-1/2 hr 1/2 hr 1-1/2 hr 2 hr 3hr 2-1/2 hr 1/2 hr lhr 1/2 hr 5hr 4hr 3/4 hr 3-1/4 hr 4hr 1 hr 1/4hr 3/4 hr 1-3/4 hr 1/4 hr 1/4 hr 2 hr 1/4 hr 6-1/2 hr 1/2hr 3-1/2 hr 1/2 hr 1 hr 1/2 hr 9-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/4 hr 1/4 hr 1/2hr Activity Rigged up Tubing handling equipment Made up BHA no. 11 Singled in drill pipe to 7427.0 ft R.I.H. to 20800.0 ft Pulled out of hole to 13395.0 ft Circulated at 13395.0 ft Pulled out of hole to 8000.0 ft Serviced Drillstring handling equipment Pulled out of hole to 50.0 ft Pulled BHA Rigged up Logging/braided cable equipment Held safety meeting Ran logs on tubulars Circulated at 13311.0 ft Conducted electric cable operations Pulled out of hole to 12573.0 ft Conducted electric cable operations Ran logs on tubulars Ran logs on tubulars Conducted electric cable operations Conducted electric cable operations (cont...) Pulled out of hole to 7500.0 ft Laid down 3570.0 ft of 2.785 in OD drill pipe Pulled out of hole to 93.0 ft Rigged down Logging/braided cable equipment Serviced Block line Held safety meeting Perforated R.I.H. to 7500.0 ft Rigged up sub-surface equipment - Mechanical firing head R.I.H. to 9000.0 ft R.I.H. to 20450.0 ft (cont...) Installed High pressure lines Held safety meeting Perforated from 16734.0 ft to 20450.0 ft Reverse circulated at 12943.0 ft Functioned Retrievable packer Flow check Circulated at 12160.0 ft Flow check Pulled out of hole to 12500.0 ft Serviced Kelly/top drive hose Pulled out of hole to 8200.0 ft Retrieved Retrievable packer Pulled out of hole to 4500.0 ft Pulled out of hole to 3716.0 ft (cont...) Held safety meeting Rigged down sub-surface equipment - TCP guns Serviced Rotary table R.I.H. to 800.0 ft Laid down 800.0 ft of 5in OD drill pipe Retrieved Wear bushing Installed Hanger plug Serviced Pipe ram Facility Date/Time 19 Nov 98 20 Nov 98 PB W Pad Progress Report Well W- 12A Page Rig (null) Date 19:30-20:00 20:00-20:30 20:30-20:45 20:45-06:00 06:00-10:00 10:00-11:30 11:30-15:30 15:30-18:00 18:00-18:30 18:30-19:00 19:00-19:15 19:15-19:45 19:45-20:00 20:00-21:00 21:00-01:30 01:30-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-10:00 Duration 1/2 hr 1/2 hr 1/4 hr 9-1/4 hr 4 hr 1-1/2 hr 4 hr 2-1/2 hr 1/2 hr 1/2 hr 1/4hr 1/2 hr 1/4 hr lhr 4-1/2 hr lhr lhr 1 hr 1-1/2 hr lhr 1 hr lhr lhr Activity Retrieved Hanger plug Rigged up Completion string handling equipment Held safety meeting Ran Tubing to 4-1/2in (10100.0 ft OD) Ran Tubing to 13411.0 ft (4-1/2in OD) (cont...) Installed Tubing hanger Reverse circulated at 13400.0 ft Installed Tubing hanger Tested Permanent packer Tested Casing Bleed down well Installed Hanger plug Tested Hanger plug Serviced Top ram Removed BOP stack Installed Adapter spool Installed Xmas tree Retrieved Hanger plug Freeze protect well - Diesel of 152.000 bbl Circulated at 3873.0 ft Installed Hanger plug Functioned All tree valves Rigged down Fluid system 8 02 December 98 Anadrill Client: BP Exploration (Alaska) Inc. Field: Prudhoe Bay Well Name: W-12a APl number: 50-029-22023 Job Number: 40002904 Rig: Nabors 18E County: NSB State: Alaska Survey Calculations Calc method for positio Minimum Curvature Calc method for DLS: Mason & Taylor Depth references Permanent datum MSL Depth reference RKB 83.7 FT GL above Permanent 53.17 FT KB above Permanent 83.67 FT DF above Permanent 82.17 FT Vertical section origin Latidude (+N/S-): 0 Departure (+ENV-): 0 Azim from rotary table to target: 111.6 Schlumberger ANADRILL Survey Report degrees SURVEY REPORT RECEIVED BEC 1.998 S.ud PXA PDC Last survey date: Total accepted surveys: MD of first survey: MD of last survey: 08-0ct-98 08-Nov-98 256 12896,70 20888.00 ORIGINAL Geomagnetic data Magnetic Model: Magnetic Date: Magnetic field strength: Magnetic dec (+E/W-): Magnetic Dip: MWD Survey Reference Criteria Reference G: ~ '~.,. (} '~(55~-'; Reference H: ....,. r,., Reference Dip: BGGM 199 tt46.10 27.63 80.67 t 002.68 1146.11 80.67 4.00 6.00 0.30 Correction Magnetic dec (+E/W-): Gdd convergence (+E/W-): Total az corr (+E/W-): 27.64 0.00 27.635 Seq Measured Incl Azimuth Course TVD Vertical Displacement Total # Depth angle angle length depth section +N/S- +ENV- displacement (fi) (deg) (deg) (fi) (ft) (fi) (fi) (fi) (fi) atAzm (deg) DLS (deg/ 1 12896.70 54.70 209.8 2 12910.00 54.33 209.7 3 12924.75 51.89 210.9 4 12956.08 49.81 213.5 5 12987.67 49.01 216.1 6 13016.49 48.91 218.4 7 13048.43 49.74 220.8 8 13079.23 51.58 221.7 9 13109.43 51.57 221.4 10 13t 38.65 52.44 221,4 11 13170.37 54.79 223.3 12 13202.24 55.18 225.1 13 13233.26 57.68 222.7 14 13262.56 59.12 221.9 15 13293.32 59.51 220.7 16 13324.54 60.27 218.3 17 13355.90 60.44 215.3 18 13386.86 61.34 214.6 19 13418.45 61.78 212.4 20 13448.90 61.72 211.3 21 13479.55 61.71 209.0 22 13510.40 62.16 209.8 23 13581.12 63.23 207.2 24 13611.44 63.25 206.1 25 13644.77 65.26 204.8 26 13673.90 65.81 203.5 0.0 8428.70 2863.64 -8957.70 -460.30 8969.52 182.94 13.3 8436.42 2862.09 -8967,10 -465,67 8979.19 182.97 14.7 8445.25 2860.31 -8977.25 -471.60 8989.63 183.01 31.4 8465.07 2855.82 -8997.86 -484.57 9010.90 163.08 31.6 8485.63 2850.35 -90t7.57 -498.24 9031.33 183. t6 28.8 8504.54 2844.50 -9034.88 -5t 1.37 9049.33 183.24 31.9 8525.34 2837.00 -9053.51 -526.80 9068.83 183.33 30.8 8544.86 2828,97 -9071.42 -542.50 9087.63 183.42 30.2 8563.63 2820.89 -9089.12 -558.20 9t06.25 183.5t 29.3 8581.67 2813.05 -9106.44 -573.47 9124,48 183.60 31.7 8600.47 2803.99 -9125.30 -590.66 9144.39 183.70 31.8 8618.72 2793,96 -9143.97 -608.82 9164.21 163.81 3t.1 8635.92 2784.12 -9162.64 -626.77 9184.05 183.91 29.3 8651.27 2775.28 -9181,10 -643.57 9203.63 184.01 30.7 8666.94 2766.37 -9200.93 -660.99 9224.64 184.11 31.2 8682.59 2758.06 -9221.76 -678.16 9248.66 184.21 31.4 8698.12 2750.88 -9243.61 -694.50 9269.66 164.30 31.0 8713.20 2744,61 -9265.80 -710.02 9292.97 184.38 3t .5 8728.21 2738.89 -9288.90 -725.30 9317.17 184.48 30.5 8742.64 2734.09 -931t .72 -739.48 9341.04 184.54 30.6 8757.14 2730.06 -9335.02 -753.01 9365.34 184.61 30.9 8771.68 2726,34 -9358.77 -766,40 9390.10 184.68 70.7 8804.12 2718,76 -9413.98 -796.36 9447.60 184.84 30.3 8817.76 2716,36 -9438.16 -808,50 9472.72 164.90 33.4 8832.27 2714,32 -9465.32 -82t.42 9500.90 184.96 29.1 8844.32 2713,12 Page 1 -9489,49 -832.26 9525.92 185.0t 0.00 2.85 17.84 9.22 6.52 6.29 6.27 6.39 0.78 2.97 8.84 4.80 10.29 5.44 3.59 7.09 8.32 3,5t 6.30 3.18 6.62 2.71 3.60 3.24 6.96 Schlumberger ANADRILL Survey Re~-~.-~ Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azm DLS # Depth angle angle length depth section +N/S- +E/W- displacement (deg/ (ftt (deg) (deg) (fl) (fi) (ft) (ft) (ft) (ft) (deg) 100t') 27 13702.89 66.70 202.1 29.0 8856.00 2712.55 -9513.96 -842.54 955t.20 185.06 5.38 28 13735.12 68.23 199.8 32.2 8868.34 2712.87 -954t .74 -853.17 9579.80 185.11 8.t 3 29 13767.55 71.28 196.1 32.4 8879.55 2714.79 -9570.65 -862.53 9609.44 185.15 14.26 30 13799.08 75,14 196.5 31.6 8888.68 2717.57 -9599.68 -871.02 9639.11 185.18 12.28 31 13829.85 77.57 196.7 30.8 8895.95 2720.15 -9628.36 -879.57 9668.45 185.22 7.9t 32 13861.61 79.84 198.2 31.7 8902.16 2722.38 -9658.01 -888.89 9698.83 185.26 8.53 33 13893.54 83.79 195.2 31.9 8906.70 2725.06 -9688.25 -897.96 9729.77 185.30 15.49 34 13924.96 83.95 193.7 31.5 8910.06 2728.93 -9718.57 -905.77 9760.69 185.32 4.76 35 13956.02 84.13 196.2 31.0 8913.28 2732.48 -9748.36 -913.73 9791.09 185.35 8.04 36 13984.78 83.30 195.4 28.8 8916.43 2735.36 -9775.91 -921.52 9819.24 185.39 3.99 37 14016.12 83.25 198.1 31.3 8920.10 2737.98 -9805.67 -930.48 9849.72 185.42 8.57 38 14048.66 83.30 197.5 30.6 8923.68 2739.95 -9834.60 -939.77 9879.40 185.45 1.95 39 14075.76 83.43 198.3 29.1 8927.05 2741.80 -9862.11 -948.65 9907.63 185.49 2.77 40 14107.82 83.27 t96.7 32.0 8930.75 2744.05 -9892.42 -958.21 9938.72 185.53 4.99 41 14139.02 83.47 199.5 31.2 8934.35 2745.92 -9921.88 -967.84 9968.97 185.57 8.94 42 14162.54 83.03 t 96.8 23.5 8937.12 2747.31 -9944.05 -975.11 9991.75 185.60 11.56 43 14193.09 83.05 194.6 30.6 8940.83 2750.4t -9973.29 -983.33 t0021.65 185.63 7.14 44 14224.04 83.23 196.9 30.9 8944.52 2753.51 -10002.81 -991.65 10051.85 185.66 7.4t 45 14253.31 83.47 194.6 29.3 8947.91 2756.46 -10030.82 -999.55 10080.50 185.69 7.84 46 14284.40 83.64 197.0 31.1 8951.40 2759.56 -10060.56 -1007.97 10110.92 185.72 7.69 47 14315.63 83.88 199.6 31.2 8954.79 2761.32 -10090.00 -1017.70 10141.19 185.76 8.32 48 14346.8 83.82 197.8 31.2 8958.14 2762.87 -10119.38 -1027.65 10171.43 185.80 5.74 49 14378.98 83.68 199.6 32.2 8961.59 2764.47 -10149.71 -1037.91 10202.64 185.84 5.56 50 14410.66 84.33 200.3 31.7 8964.84 2765.36 -10179.34 -1048.67 10233.22 185.68 2.62 51 14441.49 87.6 198.4 30.8 8967.01 2766.54 -10208.33 -t058.85 10263.10 185.92 12.27 52 14472.83 90.03 199.5 31.3 8967.66 2767.97 -10237.92 -1069.01 10293.56 t85.96 8.52 53 14504.37 91.41 198.2 31.6 8967.26 2769.48 -10267.83 -1079.22 10324.39 186.00 6.00 54 14534.56 93.29 199.7 30.2 8966.02 2770.83 -10296.36 -1009.02 10353.79 186.04 7.96 55 14566.25 94.43 198.4 31.6 8963.89 2772.21 -10326.16 -1099.31 10384.51 186.08 5.46 56 1 4597.50 98.08 200.0 3t .3 8961.03 2773.50 -10355.59 -1109.56 10414.87 186. t2 7.33 57 14628.51 96.32 197.2 31.0 8957.68 2775.09 -10384.80 -1119.39 10444.96 186.15 9.01 58 14659.59 98.59 199.3 31.1 8954.18 2776.87 -10414.15 -1129.06 t0475.17 186.19 6.77 59 1 4890.47 96.91 196.8 30.9 8950.55 2778.75 -10443.32 -1 t 38.57 10505.20 186.22 8. t 0 60 14720.94 97.29 196.2 30.4 8946.79 2781.41 -t0472.25 -1147.14 10534.89 186.25 2.32 61 14752.47 97.64 196.2 31.6 8942.68 2784.34 -10502.33 -1155.88 10565.75 186.28 1.11 62 14782.89 97.91 197.2 30.4 8938.57 2786.89 -10531.18 -1164.53 10595.38 186.31 3.38 63 14814.82 97.81 197.3 31.9 8934.21 2789.27 -t0561.36 -1173.91 t0626.40 186.34 0.44 64 14845.25 97.88 196.6 30.4 8930.00 2791.69 -10590.17 -1182.69 t0656.0t 186.37 2.29 65 1 4876.14 97.36 196.6 30.9 8925.96 2794.33 -10619.52 -1191.43 10686.15 186.40 1.68 66 14907.18 95.53 196.7 31.1 8922.47 2796.98 -10649.13 -1200.29 10716.56 186.43 5.89 67 14938.79 93.71 195.0 31.6 8919.93 2800.1 t -t 0679.42 -t208.89 10747.63 186.48 7.87 68 14969.12 93.74 1 94.5 30.3 8917.96 2803.70 -10708.66 -1216.59 10777.55 186.48 1.65 69 15000.07 91.65 193.4 31.0 8916.50 2807.80 -10738.71 -1224.05 10808.25 186.50 7.62 70 15032.02 88.59 192.2 31.9 8916.43 2812.66 -10769.82 -1231.12 10839.96 186.52 10.30 71 15064.03 86.5 191.5 32.0 8917.80 2818.05 -10801.1 t -1237.68 10071.79 186.54 6.89 72 15091.02 84.2 193.0 27.0 8919.99 2822.40 -10027.40 -1243.39 t 0098.56 186.55 10.16 73 15121.54 82.43 193.3 30.5 8923.54 2826.83 -10856.90 -12150.28 10928.65 186.57 5.88 74 15153.4 79.55 197.8 31.9 8928.54 2830.14 -10687.24 -1258.72 10959.76 186.59 16.60 75 15187.42 77.17 195.5 34.0 8935.40 2832.98 -t0919.14 -1268.27 10992.55 186.68 9.64 76 15215.08 76.99 199.3 27.7 8941.60 2834.94 -10944.90 -1276.34 11019.07 186.65 13.39 77 15248.34 76.89 198.4 31.2 8948.65 2836.38 -10973.66 -1286.16 11048.78 186.68 2.83 78 15278.22 76.71 198.7 31.9 8955.93 2838.0t -11003.11 -1296.04 t 1079.17 186.72 1.08 79 15309.83 76.89 198.6 31.6 8963.15 2839.57 -11032.26 -1305.88 11109.27 186.75 0.65 80 15340.23 76.86 197.5 30.4 8970.05 2641.38 -11000.40 -1315.05 11138.31 186.78 3.53 Page 2 Schlumberger ANADRILL Survey ReF~[ Seq Measured Incl Azimuth Course TVD Vertical # Depth angle angle length depth section (fi) (deg) (deg) (fi) (fi) (fi) Displacement Total at Azm DLS +N/S- +ENV- displacement (deg/ (~) (~) (~) (deg) 1000 81 15372.19 77.11 196.0 32.0 82 15403.28 78.08 196.5 31.1 83 15435.49 79.48 196.7 32.2 84 15465.02 82.54 195.6 29.5 85 15496.91 86.24 194.3 31.9 86 15528.28 89.21 193.0 31.4 87 15559.29 91.78 190.1 31.0 88 15591.2 92.13 192.3 31.9 89 15622.51 92.06 190.1 31.3 90 15652.96 91.99 188.6 30.5 91 15684.37 92.23 189.5 31.4 92 15715.13 92.44 189.5 30.7 93 15747.23 92.57 189.5 32.1 94 15777.72 92.78 189.1 30.5 95 15808.68 92.98 187.2 31.0 96 15840.93 91.23 186.2 32.2 97 15872.23 89.73 186,6 31.3 98 15904.01 89.59 183.8 31.8 99 15934.83 89.38 182.7 30.8 100 15965.81 89.11 183.2 31.0 101 15997.21 89.07 182.8 31.4 102 16028.50 89.69 182.7 31.3 103 16060.59 92.68 183.8 32.1 104 16089.03 93.71 181.0 28.4 105 16119.96 95.08 180.8 3t .0 106 16151.54 94.32 179.2 31.5 107 16182.94 93.6 176.0 31.4 108 16214.47 93.12 176.2 31.6 109 16245.64 91.44 174.0 31.1 110 16276.78 90.1 175.4 31.2 111 16309.88 90.96 172.7 33.1 112 16339.37 92.5 170.3 29.5 113 16371.41 93.29 168.6 32.0 114 16402.95 93.57 168.9 31.5 115 16434.74 95.58 164.6 31.8 116 16462.96 97.11 162.7 28.3 117 16496.01 97.49 160.1 33.0 118 16525.91 97.39 158.7 29.9 119 16558.08 97.36 157.1 32.2 120 16589.39 97.32 158.0 31.3 121 16620.21 97.54 157.6 30.8 122 16648.77 97.57 158.8 26.6 123 16676.34 96.32 156.6 29.5 124 16708.29 95.35 156.8 32.0 125 16739.39 93.05 154.8 31.1 126 16772.02 90.93 154,2 32.6 127 16803.06 90.07 152.5 31.1 128 16834.45 88.53 151,9 31.4 129 16866.22 88.94 150.0 31.7 130 16898.59 90.17 1 48.0 32.4 131 16928.71 91.03 1 44.8 30.1 132 16960.67 91.85 146.0 32.0 133 16992.02 91.78 142,6 31.3 8977.26 2844.00 -11090.26 -t324.03 11169.02 186.81 4.63 8983.94 2846.81 -11119.42 -1332.53 11198.98 186.83 3.49 8990.21 2849.54 -11149.69 -1341.56 11230.11 186.86 4.39 8994.81 2852,29 -11177.67 -1349.66 11256.86 186.88 t 1.01 8997.93 2855.94 -11208.34 -1357.85 t 1290.29 t86.91 t2.29 8999.18 2860.26 -11238,82 -1365,25 11321.44 186.93 10.32 8998.91 2865.64 -11269.19 -1371.45 11352.33 186.94 12.50 8997,82 2871,41 -11300.46 -1377.62 11384.13 186.95 6.67 8996.68 2877.06 -11331.15 -1383.67 11415.32 168.96 6.71 8995.60 2883.50 -11361.23 -1388.62 11445,77 186.97 4,92 8994.44 2890,30 -11392.21 -1393,56 11477.13 186.97 2.96 8993.19 2896.71 -11422.47 -1398.62 11507.78 186.98 0.68 8991.79 2903.4t -11454.10 -1403.91 11539.81 186.99 0.40 8990.37 2909.88 -11484.16 -1408.83 11570.26 186.99 1.48 8988.81 2917.06 -11514.81 -t413.22 11601.21 187.00 6.16 8987.63 2925.31 -11546.77 -1416.98 11633.39 187.00 6.26 8987.36 2933.50 -11577.87 -1420.47 11664.68 186.99 4.96 8987.55 2942.45 -11609.54 -1423.35 11696.46 186.99 8.82 8987.83 2952.13 -11640.28 -1425.09 11727.20 186.98 3,64 8988.24 2962.02 -11671.24 -1426.69 11758.12 186.97 1.83 8988.73 2972.01 -11702.59 -1428.33 11789.44 186.96 1.28 8989.07 2982.11 -11733.86 -1429.83 11820.65 186.95 2.0t 8988.41 2992.19 -11765.89 -1431.65 11852.67 186.94 9.92 8986.83 3001.49 -11794.22 -1432.84 11880.94 t86.93 10.49 8984.45 30t2.40 -11825. t3 -1433.33 11911.67 186.91 4.47 8981.87 3023.93 -11856.52 -14,33,33 11942.84 186.89 5.61 8979.70 3036.65 -11687.81 -1432,01 11973.75 t86.87 10.42 8977.85 3050.21 -11919.28 -1429.87 12004.74 186.84 1.65 8976.61 3064.06 -11950.24 -t427.21 12035.17 186.81 8.90 8976. t9 3078.15 -11981.30 -1424.33 12065.67 186.78 6.21 8975.89 3093.44 -12014.22 -1420.90 12097.95 186.74 8,56 8975.00 3108.21 -12043.38 -1416.54 12126.40 186.71 9.66 8973.38 3125.20 -t2074.80 -1410.69 12156.93 186.66 5.85 8971.49 3142.23 -12105.64 -1404.56 12186.85 186.62 1.30 8968.96 3160.32 -12136.48 -1397,30 12216.66 186.57 14.89 8965.83 3177.60 -12163.47 -1389.38 12242.57 186.52 8.59 8961.64 3198.71 -12t94.49 -1378.94 12272.21 186.45 7.90 8957.76 3218.61 -1227'2.24 -1368.51 12298.62 186.39 4.65 8953.63 3240.66 -12251.83 -1356.50 12326.70 186.32 4.93 8949.63 3262.22 -12280.52 -1344.64 12353.92 186.25 2.85 8945.65 3283.35 -12308.80 -1333.10 12380.78 186.18 1.47 8942.15 3301.45 -12333.28 -1323,31 12404,07 186,12 4.47 8938.58 3321.74 -12360.37 -1312.20 12429.83 186.06 8.53 8935.33 3344.20 -12389.61 -1299.61 12457.58 185.99 3.09 8933.05 3366.41 -12417.90 -1286.89 12484.40 185.92 9.79 8931.92 3390.26 -12447.30 -1272.87 125t2.21 165,84 6,76 8931.65 3413.45 -12475.09 -1258.92 12538,46 185.76 6.13 8932.03 3437.27 -12502,87 -1244.28 12564.63 185.68 5.26 8932.73 3461.76 -12530.57 -1228.89 12590.69 185.60 6.13 8932.99 3487.82 -12558.04 -1211.72 12616.37 185.51 12.92 8932.67 3512.82 -12582.82 -1194,63 126'39.40 185.42 4.90 8931.87 3539.39 -12609.15 -1176,47 12663.91 185.33 4.54 8930.88 3565.70 -12634.55 -1158.21 12687.52 185.24 10.86 Page 3 · Schlumberger ANADRILL Survey Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azm DLS # Depth angle angle length depth section +N/S- +E/W- displacement (deg/ (fi) (deg) (deg) (fi) (fi) (ft) (fi) (fi) (fi) (deg) 1000 134 17023.58 91.37 141.5 31.6 8930.01 3592.92 -12659.46 -1138.79 12710.57 185. t4 3.71 135 17055.12 91.1 138.7 31.5 8929.33 3620.59 -12683.61 -1118.59 12732.84 t 85.04 8.93 136 17085.23 89.42 137.0 30.1 8929.19 3647.57 -12705.93 -1098.39 t2753.32 184.94 7.94 137 17117.02 87.63 134.2 31.8 8930.01 3676.60 -12728.64 -1076.15 12774.05 164.83 10.45 138 17149.7 85.92 131.4 32.7 893t .85 3707.02 -12750.82 -1052.20 12794.16 184.72 10.02 139 17179.17 86.26 128.8 29.5 8933.86 3734.92 -12769.77 -1029.69 t2811.22 184.61 8.87 140 17210.84 86.43 t26.0 31.6 8935.88 3765.26 -12788.93 -1004.64 12828.33 164.49 8.86 141 17241.65 85.26 122.6 30.9 8938.12 3795.32 -12806.29 -979.19 12843.67 184.37 11.61 142 17273.63 83.51 120.1 31.9 8941.24 3826.59 -12822.81 -952.08 12858.10 184.25 9.54 143 17305.6 82.1 116.6 32.0 8945.25 3858,11 -12837.88 -924.14 12871.10 184.12 11.71 144 17336.63 81.39 113.3 31.0 8949.70 3888.73 -12850.82 -896.33 12882.04 t83.99 10.78 145 17367.84 80.88 112.6 31.2 8964.51 3919.55 -12862.64 .867.95 12892.09 183.86 2.75 146 17399.17 81.15 111.3 31.4 8959.41 3950.57 -12874.43 -839.18 12901.75 183.73 4.18 147 17430.84 81.36 112.4 31.6 8964.22 3981.80 -12886.06 -810.19 t2911.50 183.60 3.50 148 17461.64 81.39 112.1 30.8 8968.83 4012.25 -12897.59 -782.01 12921.27 183.47 0.97 149 17493.57 81.46 112.3 32.0 8973.61 4043.89 -12909.54 -752.71 12931.47 183.34 0.66 150 17525.67 80.99 113.2 32.1 8978.50 4075.60 -t2921.81 -723.46 12942.05 163.20 3.13 151 17555.24 81.57 112.1 29.5 8982.98 4104.76 -12933.04 -696.55 12951.78 183.08 4.18 152 17586.42 84.44 113.0 31.2 8986.78 4135.72 -12944.92 -667.95 12962.14 182.95 9.63 153 17617.66 86.47 112.0 31.3 8989.26 4166.91 -12956.85 -639. t3 12972.61 182.82 7.23 154 17649.29 86.5 111.9 31.6 8991.19 4198.45 -12968.64 -609.87 12982.98 182.69 0.33 155 17679.77 86.64 112.6 30.5 8993.02 4228.90 -12980.17 -581.69 12993.20 182.57 2.34 156 17711.00 86.78 113.5 31,2 8994.81 4260.03 -12992.37 -553.03 13004.13 182.44 2.91 157 17744.84 87.05 114.5 33.8 8996.63 4293.76 -13006. t0 -522.20 130t6.57 182.30 3.06 158 17775.71 87.05 112.9 30.9 8998.22 4324.59 -13018.50 -493.94 13027.87 182.17 5.17 159 17807.97 87.12 113.2 32.3 8999.86 4356.84 -1303t .13 -464.26 13039.40 182.04 0.95 160 17839.45 86.81 113.8 31.5 9001.53 4388.28 -13043.67 -435.41 13050.94 181.91 2.14 161 17871.36 87.26 113.2 31.9 9003.18 4420.11 -13056.38 -406.20 13062.69 181.78 2.35 162 17902.34 88.39 112.5 30.9 9004.35 4450.98 -13068.37 -377.74 13073.82 181.66 4.30 163 17933.46 90.62 111.7 31.2 9004.62 4482.18 -13080.10 -348.84 13084.75 181.53 7.59 164 17967.69 91.06 111.1 34.2 9004.12 4516.37 -t3092.58 -3t7.00 13096.42 181.39 2.18 165 17995.28 91.3 110.8 27.6 9003.55 4543.97 -13102.45 -291.23 13105.68 181.27 1.39 166 18029.19 91.41 111.8 33.9 9002.75 4577.86 -13114.76 -259.66 13117.33 181.13 2.97 167 18055.71 91.47 111.1 26.5 9002.09 4604.35 -13124.44 -235.00 13126.55 181.03 2.65 168 18087.50 91.48 111.2 31.8 9001.27 4636.14 -13135.91 -205.35 13137.52 180.90 0.32 169 18118.69 91.58 111.2 31.2 9000.43 4667.33 -13147.19 -176.27 13148.37 180.77 0.32 170 18151.00 91.51 110.6 32.3 8999.56 4699.61 -13158.71 -146.1 t 13159.52 180.64 1.87 171 18181.38 91.75 110.5 30.4 8998.70 4730.00 -13169.38 -117.65 13169.90 180.51 0.86 172 18212.63 91.51 t t t .7 31.2 8997.81 4761.18 -t3t80.58 -88.55 13t80.88 180.38 3.61 173 18244.14 91.68 110.9 31.5 8996.93 4792.67 -13191.99 -59.20 13192.12 180.26 2.29 174 18275.54 91.92 111.2 31.4 8995.95 4624.05 -13203.26 -29.91 13203.30 180.13 1.22 175 18307.22 92.13 111.0 31.7 8994.83 4855.73 -13214.67 -0.36 132t4.67 180.00 0.91 176 18338.09 92.23 111.3 30.9 8993.65 4886.61 -13225.81 28.44 13225.84 179.88 1.02 177 18370.11 93.05 109.8 32.0 8992.18 4918.57 -13237.03 58.37 13237.16 179.75 5.34 178 18401.59 93.42 109.9 31.5 8990.40 4950.00 -13247.71 87.95 13248.00 179.62 1.22 179 18433.80 92.78 110.7 32.2 8988.66 4982.15 -13258.86 118.11 '13259.39 179.49 3.18 180 18465.44 91.75 108.7 31.6 8987.41 5013.70 -13269.51 147.83 13270.33 179.36 7.1 t 181 18497.25 91.58 109.4 31.8 8986.49 5045.46 -13279.88 177.88 13281.07 179.23 2.26 182 18529.41 90.82 108.6 32.2 8985.81 5077.62 -13290.36 208.32 13291.99 179.10 3.43 183 18560.12 89.66 108.4 30.7 8985.68 5108.27 -1 3300.10 237.43 13302.22 178.98 3.83 184 18591.43 89.55 108.4 31.3 8985.90 5139.52 -13309.98 267.13 13312.66 178.85 0.35 185 18622.87 89.42 108.9 31.5 8986.18 5170.98 -13320.06 296.97 13323.37 178.72 1.64 186 18654.32 89.18 110.0 31.4 8986.57 5202.36 -13330.51 326.58 13334.51 178.60 3.59 Page 4 · Schlumberger ANADRILL Survey ReF~ Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azm DLS Cf Depth angle angle length depth section +N/S- +ENV- displacement (deg/ (fi) (deg) (deg) (fi) (ft) (ft) (It) (It) (it) (deg) 1000 187 18686.08 88.42 109.4 31.8 8987.23 5234. t4 -13341.23 356,51 13345.99 178.47 3.04 188 18717.69 88.59 108.8 31.6 8988.06 5265.69 -13351.56 386.36 13357.15 178.34 1.97 189 18748.74 89.31 109.9 31.0 8988.63 5296,67 -13361.83 415.60 13368.29 178.22 4,24 190 18780.36 90.03 108.6 31.7 8988.81 5328.34 -13372.28 445.53 t3379.70 178.09 4.69 191 18810.59 90.10 108.4 30.2 8988.77 5358.50 -t 3381.87 474.17 13390.26 177.97 0.70 192 18841.69 90.24 108.9 31.1 8988.68 5389.56 -1339t .81 503.64 13401.28 177.85 1.67 193 18871.95 90.31 109.6 30.2 8988.54 5419.73 -t340t .77 532.15 134t2.33 177.73 2.33 194 18900.88 90.38 108.7 29.0 8988.38 5448.71 -13411.28 559.54 13422.95 177.6t 3. t 1 195 18934.70 90.55 109.7 33.8 8988.09 5482.47 -13422.40 591.46 13435.42 177.48 3.00 196 18966.47 90.69 109.3 31.8 8987.74 5514.25 -13&33.01 621.44 13447.38 177.35 1.33 197 18996.78 91.40 109.2 30,3 8987,19 5544.52 -13443.00 650.04 13458.71 177.23 2.37 1 98 19029.11 91.65 109.5 32.3 8986.33 5576.78 -13453.70 680,50 13470,90 177.10 1.21 199 19060.60 91.92 108.8 31.5 8985.35 5608.24 -t3464.03 710.24 13482.75 176.98 2,38 200 19091.62 92.12 109.1 31.0 8984.26 5639.19 -13474.09 739.54 13494.37 176.86 1.16 201 19123.43 92.61 108.8 31.8 8982.95 5670.93 -13484.40 769.60 t3506.35 176.73 1.81 202 19153.45 92.95 108.7 30.0 8981.49 5700.86 -1 3494 797.97 1 3517.61 t 76.62 1.1 8 203 19175.64 93.16 107.7 22.2 8980.31 5722,99 -1 3501 8t 9.03 13525.78 176.53 4.60 204 19215.52 93.15 105.7 39.9 8978.11 5762.68 -13512.4 857.19 t 3539.57 176.37 5.00 205 19247.35 93.02 109.4 31.8 8976.4 5794.35 -1 3522 887.46 13551.07 176.25 11.63 206 19278.85 93.12 109.0 31.5 8974.71 5825.78 -13532.33 917.16 1 3563.37 176.12 1.31 207 19310.74 93.74 108.3 31.9 8972.80 5857.58 -13542.51 947.33 13575.60 176.00 2.93 208 19342.18 94.08 108.9 31.5 8970.65 5888.97 -13552.53 977.t 2 t 3587.71 175.88 2.19 209 19374.21 94.26 108.4 32.0 8968.33 5920.84 -13562.74 1007.36 13600.10 t75.75 1.66 210 19405.63 94.80 109.4 31.4 8965.85 5952.11 -13572,88 1036,97 136t2,43 175.63 3.61 211 19437.34 94.94 108.5 212 19469.57 93.64 109.3 213 19501.03 94.18 107.8 214 19532.66 94.15 108.1 215 19564.54 94.39 107.9 31.7 8963.16 5983.66 -13583.13 t066.84 13624.97 175.51 2.86 32.3 8960.74 6015.84 -13593.57 1097.32 13637.79 175.38 4.72 31.4 8958.60 6047.12 -13603.53 1127.0t 13650.14 175.26 5.07 31.7 8956.29 6078.67 -13613.28 1 t57.09 13662.36 175.14 0.95 31.8 8953.93 6110.32 -13623.08 t 187.25 13674.71 175.02 0.98 216 19596.19 94.74 107.5 31.7 8951.40 6141.85 -13632.68 1217.35 13686.93 174.90 1.67 217 19627.68 94.53 107.2 31.5 8948.86 6173.16 -13642.05 1247.32 13698.95 174.78 1.16 218 19659.49 94.71 t07.4 31.8 8946.30 6204.77 -13651.47 1277.59 13711.12 174.65 0.84 219 19690.95 93.53 108.0 31.5 8944.03 6236.12 -13661.02 1307.52 13723.45 t74.53 4.20 220 19722.49 91.92 107.5 31.5 8942.54 6267.51 -13670.62 1337.48 13735.89 174.41 5.35 221 19753.53 91.54 108.1 31.0 8941.60 6298.43 -13680.09 1366.98 13748.22 174.29 2.29 222 19784.88 91.82 107.2 31.4 8940.68 6329.75 -13689.61 1396.89 13760.69 174. t7 3.00 223 19816.75 91.99 107.6 31.8 8939.62 6361.44 -13699.11 1427.22 13773.25 t74.05 1.37 224 19849.68 91.54 109.0 33.0 8938.61 6394.37 -13709.47 t458.54 13786.83 173.93 4.45 225 19880.00 90.89 108.8 30.3 8937.96 6424.63 -137t9.28 1487.20 13799.65 173.81 2.24 226 19911.77 91.71 108.3 31.8 8937.24 6456.38 -13729.39 1517.34 138t2.98 173.69 3.02 227 19943.66 91.13 107.3 31.9 8936.45 6488.20 -13739.14 1547.70 13826.04 173.57 3.62 228 19973.43 88.32 107.3 29.7 8936.60 6517.82 -13747.97 1576.05 13838.02 173.46 9.48 229 20004.48 86.36 108.9 31.1 8938.04 6548.82 -13757.62 1605.58 13850.99 173.34 8.t3 230 20036.75 86.47 108.2 32.2 8940.05 6580.92 -t3767.65 1636.05 13864.71 173.22 2.20 231 20068.43 86.16 107.8 31.7 8942.09 6612.49 -t3777.62 1666.13 t3878.00 173.10 1.59 232 20098.31 86.13 107.4 29.9 8944.10 6642.25 -13786.64 1694.57 13890.40 172.99 1.34 233 20129.77 86.23 107.8 31.5 8946.20 6673.6t -13798.15 1724.53 t3903.51 172.87 1.3t 234 20161.94 86.23 107,4 32.1 8948.31 6705.56 -13805.83 1755.06 13916.94 t72.76 t .24 235 20193.30 85.33 107.1 31.4 8950.62 6736.79 -13815.12 1784.96 13929.95 172.64 3.02 236 20224.95 84.57 107.6 31.7 8953.41 6768.28 -13824.53 1815.10 13943.18 172.52 2.87 237 20254.65 84.89 108.5 29.6 8956.t3 6797.70 -13833.67 1843.13 13955.91 172.41 3.21 238 20288.67 85.37 108.2 34.1 8959.02 683t.62 -13844.36 1875.38 13970.81 172.29 1.66 239 20320.40 84.82 108.8 31.7 8961.73 6863.16 -13854.38 1905.33 13984.79 172.17 2.56 240 20348.91 84.30 107.8 28.5 8984.44 6891.48 -13863.29 1932.26 13997.3 172.07 3.94 Page 5 Schlumberger ANADRILL Survey R~=~t Seq Measured Incl Azimuth Course 'I'VD Vertical Displacement Total at Azm # Depth angle angle length depth section +N/S- +E/W- displacement (ft) (deg) (deg) (ft) (ft) (ft) (ft) (fi) (ft) (deg) DLS (deg/ 1000 241 20380.95 82.23 109.3 242 20415.04 81.88 109.0 243 2044.5.67 80.42 108.4 244 20476.82 80.65 109.5 245 20508.75 80.60 109.0 246 20540.87 80.74 108.5 247 20572.95 80.22 109.3 248 20604.39 80.46 108.0 249 20635.81 80.42 108.0 250 20666.25 80.50 108.7 251 20698.13 80.67 108.5 252 20729.75 80.74 108.6 253 20762.08 80.70 108.8 254 20793.57 80.70 108.9 255 20824.65 81.01 109.0 256 20888.00 81.01 109.0 32.1 8968.20 6923.32 -13873.43 t962.48 14011.55 171.95 7.94 34.0 8972.90 6956.96 -13884.48 1994.29 14026.97 171.83 1.35 30.7 8977.62 6987.26 -13894.20 2023.03 14040.71 171.72 5.13 31.1 8982.74 7017.90 -13904.17 2052.04 14054.78 171.60 3.57 32.0 8987.95 7049.45 -13914.58 2081.85 14069.45 t71.49 1.55 32.1 8993.15 7081.08 -13924.76 2111.84 14083.99 171.38 1.60 32.0 8998.45 7112.61 -13934.98 2141.70 14098.60 171.26 2.95 31.5 9003.73 7143.62 -13944.91 2171.12 14112.91 171.15 4.14 31.4 9008.95 7t74.52 -13954.48 2200.57 14126.92 171.04 0.13 30.4 9013.99 7204.46 -13963.92 2229.02 14140.70 170.93 2.29 31.9 9019.21 7235.88 -13973.95 2258.85 14t55.34 170.82 0.82 31.6 9024.31 7267.03 -13983.87 2288.42 14169.88 170.71 0.38 32.4 9029.53 7298.96 -13994.13 2318.70 t4t84.92 170.59 0.62 31.5 9034.62 7330.02 -14004.17 2348.12 14199.66 170.48 0.31 31.0 9039.55 7360.59 -14014.11 2377.07 14214.28 170.37 1.05 63.4 9049.46 7423.15 -14034.50 2436.28 14244.39 170.15 0.00 Page 6 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrle NO. 12113 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 12/1/98 Field: Prudhoe Bay (Cased Hole) Color Well Job # Log Description Date Print Blueline Sepia LIS Tape W-12A 98617 ULTRA SONIC CEMENT IMAGER 981115 i Z-11 98611 RST-SIGMA 981016 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED Alaska Oil & Ga~ ~ns] <;ommissim Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'rN: Sherrie Received ~ ~'~~ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Jo~ DATE' Chairmar¢' THRU: Blair Wondzell, ~ P. !. Supervisor ~":)/',a~ ~. ,/ FROM: Larry Wade,~4//¢i~ SUBJECT: Petroleum Inspector October 19,1998 FILE NO' . DOC BOP Test Nabors 18E BPX PBU W-12a PTD 98-182 October 19,1998: ! traveled to BPX W pad to witness a BOP test that was done late due to the rig having problems in the Kingak shale. The test went well except for a leak on the bottom flange on the stack. The unibolt flange was tightened and everything tested. Even though the BOP test ocurred across shifts everything went smooth with a minimum interruption. SUMMARY: ! witnessed a BOP test on Nabors 18E, 0 failures, 3.5 hours. Attachments: cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report. OPERATION: Drlg: Orig Contractor: Operator: Well Name: Casing Size: 7" Test: Initial X Wo rkov e r: DATE: 10/19/98 Nabors Rig No. fSE PTD # 98-182 Rig Ph.# 659-4608 SSD Rep.: John Boyd W- 12.A Rig Rep.: Set @ 13579' Location: Sec. Weekly X Other David Hanson T. R. Meridian Test Pressures 250/5000 ............... . ...............::. . . ....... ........................... ;..; .... .- .............. :: ::::::::::::::::::::: Test MISC. INSPECTIONS: FLOOR SAFETY VALVES: Location Gen.: ok Well Sign X Upper Kelly / IBOP Housekeeping: ok (Gen) Drl. Rig ok Lower Kelly / IBOP PTD On Location X Hazard Sec. X Ball Type Standing Order Posted X Inside BOP Quan. Pressure P/F I 25O/5000 P 250/5000 P 250/5000 P 250/5000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. 1 250/3500 250/5000 1 250/5000 I 250/5000 250/5000 250/5000 25075000 MUD SYSTEM: Visual Alarm Trip Tank X X Pit Level Indicators X X Flow Indicator X X Meth Gas Detector X X H2S Gas Detector X X P/F P CHOKE MANIFOLD: P No. Valves 16 ~ 1 P No. Flanges .42 P Manual Chokes 2 P Hydraulic Chokes 1 P P' ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 862100 Test Pressure 250/5000 P/F 250/5000 P P P. Functioned Functioned 2,900 1,gO0 minutes 35 sec. minutes 0 sec. X Remote: X Psig. Number of Failures: ,Test Time: ~ Hours. Number of v a lv es tested 22 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: odg-Well File c - Oper./Rig c - Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade Ft-.021L (Rev. 12J94) aingjsfe.xls SUBJECT RECEIVED OCT 0,1- 1998 BP EXPLORATION ~ Oil ~~~~r~ DATA SHEET NO. OF . BASED ON ENGINEER BUDGET/AFE NO. DEPT. APP'VL ) AK 2337-1 (3194) ~6T~ 99~ LO6 ~d 6[:90 96/~0/0[ BP EXPLORATION ENGINEERING .DATA SUBJECT BASED ON ENGINEER :DEPT. APP'VL DATE SHEET NO.~ OF V?/~'&~,,~ ,o. FILE NO. RECEIVED OCT 04 1998 Oil & Gas Cons. C~mmissiol~ Anchorage AK 2337-1 (3194) /.fir Y~.~I RT 2a WELLHEAD: 13-5/8" x 5M psi FMC Actuator: Baker EHST (Proposed) KB. ELEV = 49.69' ORIGINAL KB. ELEV - 49.03' BF. ELEV = 20.81' 6.SPPG DIESEL DIESEL FREEZE PROTECTION AT +/- 2200' MD 13 3/8", 68#/ft, L-80, BTRS @ 3027' 'X' NIPPLE @ 2200' 6 - 4.5" X 1" GLMS'S 8.5PPG SEAVVATER 4.5", 12.6#/ft L-80 Mod-But Tubing CEMENT PLUG FROM 13080'-12745'. KICK OFF @ 12945' SECTION MILLED 12900'- 12945' FOR KiCK OFF @ 12945' 7" x 9-5/8" LINER HANGER/PACKER @ 12445' 4-1/2" x 7" PRODUCTION PACKER @-13161' 4-1/2" LINER HANGER 6" TD @ 24058' @ 13393" 4-1/2", 12.6#, L-80 Mod-But SOLID LINER EZSV RETAINER @ +/-13080' TUBING CHEMICAL CUT @ +/-13130' 3-1/2", 9.2#/ft, L-80, TDS TAILPIPE TUBING TAILWLEG @ 13214' 5-1/2" LINER TOP @ 13209' 9 5/8", 47#/ft, NTS0$, NSCC @ 13403' 8-1/2" TD @ 13543' 4-1/2" X/Packer/X/XN WOA TAILPIPE@ -13293' (Stabbed into Tieback) 9 5/8" OTIS HOM PACKER, W/3.85" ID @ 13136' 3 1/2"'SWS'X NIPPLE, 2.75" ID @ 13181' 3 ll2"'SWS' X NIPPLE, 2.75" ID @ 13203' Squeezed perforations from 13715' - 13846' PBTD @ 13933' TD @ 14057'-. 5-1/2", 17#, NTSOS NSCC @ 14057' DATE 8-25-98 REV. BY WBL COMMENTS ~Pr0posedii,~tat~s PRUDHOE BAY UNIT ~LF_LLz~- 1 APt -- BP Exploration (Alaska) TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 9, 1998 Dan Stone Engineering Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Prudhoc Bay Unit W- 12A BP Exploration (Alaska) Inc. Permit No: 98-182 Sur Loc: 1542'SNL, 1196'WEL. Sec. 21. TI IN, RI2E? UM Btmhole Loc. 218'NSL. 4070'WEL. Sec. 34. T11N, R12E, UM Dear Mr. Stone: Enclosed is the approved application for permit to rcdrill thc above referenced xvell. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and docs not authorize conducting drilling operations until all other required permitting determinations arc made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commiss3on-vem~leum field inspector on thc North Slope pager at 659-3607. David W. Joh,9,ston ) Chairman ~ BY ORDER OF THE COMMISSION dlf/Enclosurcs cc: Department of Fish & Game. Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA · ALASKA_..,IL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test C~] Development Oil [] Re-Entry [] Deepen I--IService I--I Development Gas I--ISingle Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 83.25' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047452 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1542' SNL, 1196' WEL, SEC. 21, T11 N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 4684' NSL, 2096' WEL, SEC. 33, T11N, R12E, UM W-12A Attotal depth 9. Approximate spud date Amount $200,000.00 218' NSL, 4070' WEL, SEC. 34, T11 N, R12E, UM 09/20/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047454, 218'I No Close Approach 2560 20935' MD / 8870' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 12945' Maximum Hole Angle 97.5° Maximum surface 2982 psig, At total depth ('I-VD) 8800' / 3933 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTC 748' 12795' 8370' 13543' 8710' 105 sx Class 'G' 6" 4-1/2" 12.6# L-80 IBT-Mod 7542' 13393' 8627' 20935' 8870' 848 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 14075 feet Plugs (measured) ~'~j' ', S EP 0 2 998 true vertical 9180 feet Effective depth: measured 13994 feet Junk (measured) Alaska 0il & Gas Cons. Commission true vertical 9126 feet Anchorage Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 147' 147' Surface 2990' 13-3/8" 4338 sx Coldset II 3027' 3027' Intermediate 13446' 9-5/8" 1211 sx Class 'G' 13483' 8792' Production Liner 866' 5-1/2" 250 sx Class 'G' 13209' - 14075' 8620' - 9180' Perforation depth: measured 13715' - 13744', 13747' - 13766', 13769' - 13778', 13780' - 13785', 13795' - 13824', 13827' - 13846' true vertical subsea 8852' - 8938' (six intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: W.B. Lloyd, 564-4016 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~---------'~.._~,% ~ DanStone Title Engineering Supervisor Date Commission Use Only Permit Number APl Number _App. rovaJ..D_~ate See cover letter ~ ~ "//~2_ 50-029-22023-01 ¢,, ~.-' ,~ for other requirements Conditions of Approval: Samples Required []Yes [~No Mud Log Required []Yes ~[,No Hydrogen Sulfide Measures [~Yes [] No Directional Survey Required ]~Yes I--]No Required Working Pressure for DOPE []2M; []3M; /[~5M; [] 10M; [] 15M 9~rhal Signed By by order of David W. Johnston Approved By Commissioner the commission Date ~' .'" 7'" ~'~) Form 10-401 Rev. 12-01-85 Submit In Triplicate · ~' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 lie. Type of work l--l Drill [~Rediill Ilb. Typeofwell [~Exploratory FlStratigraphicTest I~ Development Oil Re-Entry [] DeepenI []Service [] Development Gas []Single. Zone [] Multiple Zone 2. "Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 83.25' Prudhoe Bay Field / Prudhoe 3. Address 6. ProPerty Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047452 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1542' SNL, 1196' WEL, SEC. 21, T11N, R12E, UM Prudhoe Bay U..nit . .. At top of productive interval 8. Well Number Number 2S100302630-277 4684' NSL, 2096' WEL, SEC. 33, T11N, R12E, UM W-12A At total depth 9. Approximate spud date Amount $200,000.00 218' NSL, 4070' WEL, SEC. 34, T11N, R12E, UM 09/20/98 1'2. Distance to nearest p~:~perty line113. Distance to nearest'well 14. Number of acres in prOperty 15. Proposed depth (MD and TVD) ADL 047454, 218'I No Close Approach 2560 20935' MD/..8870.' ...TV.Dss 16. TO be completed for deviated wells 1~. Anticipated pressure {see 20 AAc 25.035 (e)(2)] Kick Off Depth 12945' Maximum Hole Angle 97-5° Maximum surface 2982 psig, At total depth (TVD) 8800'/3933 PSig 18. Casing Program Specifications Setting Depth Size Top Bottom .Quantity of Cemen..t .......... Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) , , 8-1/2" 7" 26# L-80 BTC 748' 12795' 8370' 13543' 8710' 105 sx Class 'G' 6'" ' 4-1/2" 12.6# L-80 I BT-Mod 7542' 13393' 8627' 20935' 8870' 848 sx Class 'G' ~ , , 19. To be completed for Redrill, F~e-entrY, and Deepen Operations. E Present well condition summary Totaldepth: measured 14075 feet Plugs (measured) i" ' !; /~i,.._h e,~F~? 0~ '~998 true vertical 9180 feet L,) ~*~'~ I'-' L J U ' "~ Effective depth: measured 13994 feet Junk (measured) ~a$~t0il & true vertical 9126 feet Anch0ra~e Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 147' 147' Surface 2990' 13-3/8" 4338 sx Coldset II 3027' 3027' Intermediate 13446' 9-5/8" 1211 sx Class 'G' 13483' 8792' Production Liner 866' 5-1/2" 250 sx Class 'G' 13209' - 14075' 8620' - 9180' Perforation depth: measured 13715' - 13744', 13747' - 13766', 13769' - 13778', 13780' - 13785', 13795' - 13824', 13827' - 13846' true vertical subsea 8852' - 8938' (six intervals) ....... ,, 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements , . Contact Engineer Name/Number: W.B. Lloyd, 564-4016 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Dan Stone Title Engineering Supervisor Date Commission Use Only Permit Number I APl N'umber I APPr°val Date ISee c°ver letter ,,~..,/'~ ~ 50-029-22023-01 ~ -- ~-/'* ~ ~ .for other requirements Conditions of Approval' Samples Required [] Yes ~ No Mud Log Required [] Yes [~ No Hydrogen Sulfide Measures [~Yes [] No Directional Survey Required [~Yes [] No Required Working Pressure for BOPE []2M; F-~3M; ~j~5M; FI10M; I--115M Other: :Approved By DaVid W. dohrlston Commissioner the commission Date IWell Name: i W-1 2a Weft Plan Summary Tie-in Survey: Target Start Location' Bottom Hole Location: Type of Well (producer or injector): I Producer Surface Location: 3738' FSL, 1196' FEL, Sec. 21, T11 N, R12E X = 612049.02, Y = 5958715.07 63' FSL, 1675' FEL, Sec. 28, T11N-R12E X = 611723.66, Y= 5949756.00 4684' FSL, 2096' FEL, Sec. 33, T11 N-R12E X = 611334, Y = 5949090 218' FSL, 4070' FEL, Sec. 34, T11 N, R12E X = 614696, Y = 5944675 I AFE Number: I 4P1035 I Estimated Start Date: I 9/20/98 KOP MD: TD MD: 12945' 20935' I Rig: J Nabors18E Operating days to complete: I 36 KOP TVD: TD TVD: 8379' ss 8870' ss RKB/ -Surface Elevation (a.m.s.I) B3.25' 47.83' J Well Design (conventional, slimhole, etc.): Extended Horizontal Sidetrack Producer Objective: I Selectively geo-steer well to optimally drain 4 - Ivishak Zone 4 targets Formation Markers Formation Tops MD TVD (SS) Kingak D 8316 Tie-In Survey 12891 8345 Top Window 12945 8376 KOP 12950 8379 Curve 6o/100' 13057 8440 End 6°/100 curve Kingak C 13161 8498 Kingak B 13298 8574 Top Sag River 13535 8706 7" .casing point 13543 8710 13643 8766 Curve 18o/100' 13818 8826 End 18°/100' curve 14418 8895 Curve 8°/100 14614 8892 End 8o/100' curve 15022 8722 Curve 8°/100' 15305 8923 End 8°/100' curve 15500 8722 Curve 9o/100' 15649 8909 End 9°/100' curve 15782 8910 Curve 4°/100' 16480 8868 End 4°/100' curve 16590 8854 Curve 10°/100' 17132 8845 End 10°/100' curve 17793 8908 Curve 8°/100' 17910 8913 End 8°/100' curve 18843 8900 Curve 9°/100' 18914 8893 End 9°/100' curve 19418 8830 Curve 8°/100' 19645 8836 End 8°/100' curve 20105 8921 Curve 8°/100' 20307 8930 End 8°/100' curve 20935 8870 TD Casin¢/Tubin¢ Proc ram Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD M D/TVDss 8-1/2" 7" 26# L-80 BTC 748' 12795'/8370' 13543'/8710' 6" 4-1/2" 12.6# L-80 I BT-M od 7542' 13393'/8627' 20935'/8870' tubing 4-1/2" 12.6# L-80 I BT-mod 13390' Surf. 13390'/8625' General Mud Program Intermediate Mud Properties: Fresh Water LSND 8-1/2" hole section Density Viscosity Yield 10 sec 10 min APl HTHP (PPG) Point gel gel Filtrate Filtrate LSND 9.9 38-42 8 - 15 5 - 8 11-15 4 - 6 <10 Production Mud Properties: Quik Driln/Brine 6" hole section Density Viscosity Yield 10 sec 10 min pH APl HTHP (PPG) Point gel gel Filtrate Filtrate 9.0 32-35 8-12 3-8 5-15 8-9 4-6 10-12 Directional KOP: +12945' MD (estimated) 97.5° Maximum Hole Angle: Close Approach Well: None Cement First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 7" Intermediate Premium Tail: None Single Stage, Single Slurry Job 105/15.8 / 1.14 Full cement across liner interval (748') 4-1/2" Liner 848 / 15.8/1.19 None 150' liner lap, TOC 200' above TOL, Class "G" cement, 50% excess in open hole Logging Program LWD Logging: 8-1/2" Hole MWD/GR/ directional 6" Hole MWD lAB directional / GR / Res Open Hole Logs (eline): 8-1/2" Hole None 6" Hole 1) DPC Platform Express (GR/RES/LDT/NUE/Sonic), Possible RFT's Cased Hole Logs (eline): None Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics will be provided when determining rig (rig will be in the current fleet of north slope rigs and the schematics should therefore be on file with AOGCC). Maximum anticipated bottom hole pressure is 3933 psi at 8800'TVDss. Maximum anticipated surface pressure assuming gas in entire annulus (0.1ppg) is 3053 psi. Hazards · This well will penetrate ,-,600' of lower Kingak at 56° in the 8-1/2" section. Good drilling practices, including optimized flow rates of 410-430 gpm, slower trip and connection speeds, pumps at 40% when reaming connections, larger nozzle area for reduced sidewall erosion, all will Assure a trouble free interval. · There are 4 known faults in the reservoir interval ranging from a 20' through to a 90' throw. Lost circulation across the faults which will be controlled with productive zone LCM pills and/or weighted seawater for reduced fluid loss expenses. _. Low reservoir pressure and lost circulation due to Iow pore pressure within the reservoir interval. Disposal Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC- 2A for disposal. W-12a Short Well Summary Pre-Rig Work: NOTE: If any problems are observed with the 95/8'' packoff during pre-rig operations, notify the Operations Drilling Engineer, Nabors 18E Company Representative and the wellhead manufacturer. Repairs will be made prior to initiation of rig work. 1. RU wireline and retrieve SSSV at 2278'. Test 95/8'' and tubing packoffs to 5000 psi and function LD screws. 2. MIRU electric line and cut 31/2'' tubing at 13,130'. (Note: Utilize most efficient cutting mechanism. Remaining tubing below cut will not be further utilized) RD electric line. 3. Circulate seawater through cut until clean returns are observed. Freeze protect tubing and annulus to 2200' with diesel. Bleed pressures on tubing/annulus. Zero pressure on all annuli is required. 4. Set and test BPV, remove well house and flow lines, level pad and dig out cellar. Notify Operations Drilling Engineer upon completion of work. Rig Work: 1. If 95/8'' packoff does not test during pre-rig, contact the wellhead manufacturer's representative to initiate repairs. 2. MIRU. Pull BPV and set and test TWCV to 1000 psi. ND tree and NUBOPE and test same per SSD policy. Pull TWCV. . Circulate out freeze protection with seawater and attempt to pull 31/2'' tubing. As indicated, Kinley surveys and video camera's indicate substantial tubing degradation and therefore additional fishing runs may be required to pull tubing. Have grapple and spears available to fish remaining tubing, if necessary. . RU wireline and make a CCL/gauge ring/jjunk basket run to 13090'. RD wireline. PU 9-5/8" EZSV cement retainer on drill pipe and RIH. Set retainer at 13080' (50' above cut per AOGCC 25.105.h.2) and test above retainer to 3000 psi. If test is not achieved, PU 9-5/8" RTTS to isolate leak and remediate as necessary. Upon determination of leak and successful remediation, proceed to step 5.. Establish injection into perforations and pump 33.6 bbls of cement (includes additional 5 bbls for squeeze) below retainer. Sting out of retainer and circulate a minimum of 3 complete circulations (long way) through drill pipe prior to POOH. 6. RIH with section milling BHA. Spot 18 ppg milling fluid from PBTD to 12945'. Mill Iow side window per directional program. POOH with milling assembly. . RIH open ended and wash to top of retainer. Spot a 31 bbls balanced cement plug to bring TOC to 12745'. POOH to above plug and perform hesitation squeeze to achieve final squeeze pressure of 2000 psi. POOH. o PU 8V2" BHA and RIH. Displace wellbore to drilling fluid and drill 8V2" wellbore to 13643' md. Run and cement 7" casing to TD. Drill out 7" casing plus 20' of new formation and perform FIT to 10 ppg. Drill 6" undulating, horizontal wellbore to 20,935' using lAB and GR/Res for directional control. 10. Log well with drill pipe conveyed Platform Express with sonic. Run RFT's as required. 11. Run 41/2'' solid liner to TD and cement. Drill pipe convey perforate based upon Iog/RFT evaluation. 12. Run 41/2'' L-80 completion with 7" x 4V2" production packer and standard WOA tailpipe with WLEG. Circulate freeze protection to 2200'. Land completion and set packer. 13. Set and test TWCV to 1000 psi. ND BOPE, NU Tree. Pull TWCV and set/test BPV. RDMO. An~drill Schlumberger 1[11 EASt 80th ^venue Anchora~e, AK 99518 (907) 349-($L] Fax 344-2160 HELL PLAN for SHARED SERVICES DR£LLING · 4 . ,.'.~'~ '~L~:i '. 7:·, . . : b;%:', i::'um Curvature L':'.: Ls ....... : PEST S'~:f¢~Cc L~t.. : 70.296~5407 N S'a:~CC l. On9. : 1.%9.09267115 W Le<3 a ~ Description Surface ...... : 3738 FSL 1!96 PE~, S]l TllN 'l'ue-tn =~rvey: 63 FSL 1675 ~gb S28 TLIN Tar~et Start.: 4684 FSL 2096 FEI, S33 TI1N ~h~ .......... : ~1~ FSL 4070 ~EL S34 ~LIN L~)CATIONS - ~LASKA Zone: 4 X-Coord Y-Coord 6 t20¢9,02 59587L5.0V 6 LL723,56 5949756,00 6 L[514 ,00 5949090.00 6 L4696.00 5944675.00 Prepared ..... : 01 [{ay 1998 Weft sect az.: 150.13 K~ elevation.: 82.87 ft I,la~ne~[c Dcln: ~28,800 ~cake Factor.: 0.999914~6 Convcrgcncc..: .+0.854]1099 209.73 7665.8'! 7583 00 8030,87 7948 OO ~).74.8'1 80!)~ O0 8398.8'! 83~6 O0 8'~27.6~ ~344 75 7535.9] 8953.99 S ~$9.02 ~'; 615723.56 5949756.00 taLL 0.O0 7' ] ,:900. 0(1 54 .6.5 ';' ,i' ~',t;[;O',; ~29.'~5.0(J 5].96 Y~:.. ('L:R7;< 5/100 12950.00 5].~ I 3ilO(). 00 54 . 92 E:;D G/tOO ~d~,.'7~ 13056.94 56.2~ TJC 5316i.24 56 .22 .-' / ,,-.;,:~urLLh (c~98 ~'].2AP3 3.2, C 1</47 PM P) 2ll 4'90 .67 8407 .80 2~ ~5" 8522 87 8440,00 " 215.15 8580 ,87 8498 ,00~ 7539.32 8959.81 S 462.32 '1558.34 0991.85 S 479.90 7560.50 8995,4P S 48[.79"l'l 7581.14 9030.76 S 501..R7 7602.37 9070.02 S 527.6] 7638.97 9t%0.89 S 5'7'7,53 6~1720,34 5949750.13 121L 3.04 611703.24 5949717,8~ La0L 3.04 611701.40 5949714.24 7iR 61168~.86 5949678.61 69R 6.00 611656,71 5949638,97 ~S 6.00 6~607.86 5949567.37 lis 0.00 PI(()POSED I,;IILL PROP I LE 5'~'A['LON ~<EASL;RED [~:CL,W DI~CTION ~R'F~b-DEPT}(S SECTION COORDINATHS-FRO~ ~S~ Zone 4 ~Oh DL/ [ D~?i F[C~TION DEPTH ANGLE AZN~H T~ S~-SEA DEPOT 9;E~D X Y PACE 7j~ ]3297.9l 56,~2 215.i5 8656.8? 8574.00 ~686.93 9~].77 S 642.93 W 611S~].BS 5949473.54 ~ 0,00 ';{:','., SAC ]~5.15.29 56.22 215.15 8788.87 8706,00 ~770.23 9395.0g S ~56.53 W 6~1432.68 59493~0.5~ ~ 0.00 ?" C~ ;mT <~)> 13543.00 56.22 215.15 8093.16 8710,~9 7772,94 9400.31 S 760,22 W 611429.06 5949]05,27 HE 0.00 C.~'J~ 18/100 l~642.85 56.12 2~5.15 8848.68 8765.DL 7801.98 9468.27 S 808,0~ W 6il382.30 5949256,72 34L L]650 00 57.2~ 2L4.30 8852.60 ~';d9.';5 7010.54 94';3,~8 S 011.41 W 6[l]78.97 5949231.?6 34L 18.Fm0 L]?O000 64.~0 L~l~500 6~,78 1~75 O~ 76.63 ~L%,45 8865.41 8782.5~ 7~20,38 9491,11 S 8~].05 ~,; 6LL367.60 5949213.56 32L 18.00 2~8.8L 8~76.77 8793.90 7R31.52 9510,]7 S 834.~ f'; 6L1356,~ 5949194.]4 3LL 28,00 20~.32 8~86.60 8803.7~ 7843.89 95]0.74 S 844.85 ~ 6L1346,40 5949173.61 30L 18.00 20J.gV 8~94 ~5 85LI.98 7857.~3 955~.k0 $ 854.8~ W 611536,70 5949152.11 29L 18.00 ~01.V~ $90L ~6 88L8.59 787~.03 9574.]2 S 864,22 W 6]]3~7.68 5949~9.~6 29L 18,00 (.", :X VB P~/1 O0 13800 00 80,59 199.53 6906 40 882].53 7887.G2 9597.25 S 872,85 W 611319,40 5949L06,70 28L LS.00 13817 7~ 83,40 198.01 8308 87 8826,00 7899.22 9653.86 S 8~8,49 W 6113[4,00 5949090.0[ HS 1.38L7 33 83,40 198.01 8908 87 ~826,00 ?899.22 9613.87 S 878.49 W 6113T~.00 59t9090,00 HS L~.00 144L8.3! 83.40 198.01 8977 87 8895,00 I 8299.3~ 10381.~3 S L062.99 W 611%]8.00 59485~0.00 1IL 0,00 14500.00 89,78 196.59 8982 72 8899,85 8354.~3 L0259,05 S L087.23 W 6LILT4.93 5948q41.84 12L 8,00 5/3.00 CURVR d'.?.VL:' 5/lOt 14502.78 90.00 196,55 8982 73 8899.66 8356.65 10261,71 S 1088.02 I'; ¢11LL~.17 5948439.~6 L2L 8.00 14609.00 97.59 194.86 8976.30 889],43~ 8424.50 10355.02 S 1114.26 W 61L089,33 5948345.48 13L 8,00 146L3.61 98,66 194,6R 89'7~,3$ 889'L.50~ 8434.09 10368,05 S 1117.68 9l 6iL086,10 5948332.40 MS 8.00 15022.2~ 98.66 ~94,62 891~,8'7 8830.00 87~2.34 10gS9,OL S 12~9.63 ('l 6i0990,OO 5947940.00 L7~L 0.O0 iSh00,00 92.44 [94 53 8905,36 0822.49 8'77'?.54 1083) 8] S 1239 08 W 610971,67 5947864.91 [795 8,00 L51,30 .49 90.00 L!,2O0 .00 84 .44 t 53(~0 .00 "; 6 . 4.1 ] 56.% t~ 95 89 (,',"..:ir~l (C)g('l ~dl2AP3 ].2C 1:47 ['l,1 P) 194 '19 8904.7] 882L.04 8?99.32 10863 34 S 1246 7[ ~ 65096~,48 594'7835,29 1795 8.00 L94 'IL 8908.08 8825.2'1 k' 0846.97 10930 54 S 126q O] W 610948.L6 5947~6~,64 17~L 8.00 194 30 892'1.68 884)..8l 89L9,58 11026.00 S 1288 46 W 6]0925.L6 594767~.04 199L 8.00 1,1,1 ~'~ t'l')2r,.'/ll (11%'1'2 ql tl')Z2.fll 1,1.0'3l).36 S 1211"1,57W 61(lg.ld.t2 5947667.6'; HS O.0(l 2.~4.'2U fl9'12.~7 flflg0 00 9059.02 'J. E2L4.36 U 1336,4'IW 610U80.00 5947~8].00 21( 0.00 ,, , '],94.~6 8989.22 89,36 3b 9129.~1 ~L309.53 S h]61,0L W 610856.85 5947387.49 2R 9,0fl 194.S'5 899L.58 8908 ~1. 91.64.11 11356.80 S ~373,45 W 610845.12 5947340.04 NS 9.00 194.03 8991.58 690~ 7k] 9L64.1l L1.35~.RO S 13~3.~5 ~.. 6L0~45.12 59473~0.03 HS 9,00 ANADR~[,/. AKA-DPC F'EASI ILtTY P AN NOT APPROVED FOR EXECUTION I> X I> F- F- S:'A'£%ON t,%b:ASL1RBD £NC~{ DIRECTION VERTICAb-DEFFRS SBCTION COOR_DI}fATES-FROH ALASKA Zone 4 TOOL Db/ iD~;':'i?~CAT[O~f OEP'PM ~IGLE AZIMUTH TVO Sb'B-S~~. DEPART ~ELL~AD X ¥ FACE 100 ~mm ~ '£'37','~ 4/~0~ ~S?~.94 89.44 ~4.85 89~,67 89~0.00 9256.~3 ]~85.~5 ~ ~0~.~9 ~ ~t08~,O0 59~72~.~0 ?~U 0.00 15000.00 89.65 L9.1.~4 8993.01 8910.141 92~1.54 11502.83 S ~4~2.01 W 610~08.~4 594719].~5 731 4.00 L5829.84 90.00 193.00 8993.10 89%0.~3]I 9293.~ 1T531,84 S 1419.01 W 6L080~.1~ 5947164.35 731 4.D0 15900.00 90.~2 190.31 8992.60 8909.~3~ 9345.73 11600.£5 S 1433.18 ~1 610~89.03 5947095.45 g]L 4.00 L6000.OO 9[.98 186.48 8990.%7 8907.30' 94R4.20 11699.42 S 1449.78 P~ 610975.91 5946996.37 73L 4.00 ~;:D .;/i rjrj ~K2QC.O0 94.26 ]63~Q.00 95 38 ]6400.00 96 48 ~64~0.39 97 34 1~2.65 8985.7! 8902.84 9506.57 LZ790,99 S 1455.74 ~¢ 610769.44 5946896.71 73b 4.00 1'78.81 8979.26 8896.39 9592.45 L1098.75 $ 1457 Ok W 610769.6~ 5946996.95 74L 4.00 174.95 8970.85 8887.98 9681.%1 L1998.23 S 1451 59 W 610776.55 5946697.57 941 4,00 1.71.08 0960.51 88'1'1.6~ 9773.03 12096.93 S L439 $1 ~ 610790-11 5946599.06 741 4,00 167.96 0950.85 ~86'1.98 9848.30 12175.4~ S 1~5 0O W 6L0805.78 5946520.8~ H~ 4.00 Z'.'Rv? ~,.J/~oo '~{:;D !O/lO0 CURVE , ','i,",/H fl/ I oo 16589.86 97 34 16600.00 9'7 12 16700.00 94 88 16800.00 92 $L 16900.00 90 06 16902 43 90.00 17000 O0 87.61 17100 O0 85.23 17131 57 84.50 161.96 8936.87 8854.00 D;51.65 12281.59 S ~402 36 ~'; 6i0830.O9 5946415.00 1021 0.00 166.96 8935.59 8852.72 9961.25 ~2291.41 S 1400.17 ~; 61083~.33 5946405,21 1021 L0.00 357.16 8925.11 8842.24 [0058.43 12385.90 S 1J69,57 ~'; 610864,34 594631~.20 10$b L0.00 ~47.43 89t8,65 8035.78 10158.03 12474.~3 S 1323.22 [{ 61~911,99 5946~23.68 104b [0.00 137.73 8916 4l 8833.54 10259.01 12553.42 S 1262.55 W 610973,84 59461~$,30 1041 137.49 8916 4l 8833.54 10259.3~ 12555.22 S T260.91 W 610975.50 59~6143.53 /041 10.OC 128o03 8918 45 8835.58 I 1035~.37 1262[.37 S ~k89.38 W 61i048.00 5946078.46 i04L 118.30 8924.70 8841.83I~ 10441.21 12675o91 S L105.95 W 61LL32.23 5946025.17 /0~L 10.00 1L5,91 8927,53 8844.66 10467.47 [2690.06 S 1077.87 W 6li160.51 5946011.44 ~S 10.O0 ]lb.21. 8990.~7 t]9(lfl,O0 1'1007 14 ~2970.43 S 482.44 W 61i960.OO 5945740.00 481 O.OO 17800 OD 84.89 1'1D95 59 90 ,00 l lq06 00 90. ;~4 11,; I ~) % l 90 79 l~ ~J 'I J ~0 90.79 I'~41'/ ~fJ 9'/.53 (,:c::~dr.~]l (c)98 H't2AP3 ~.2C 1:47 114,78 8991.54 8908.6'7 fL013 04 12973 48 S 475.90 W 611766.59 5945737.O$ 481 8.00 /09.08 8995.80 8912.93 ll0R8 O] 13009 12 S 387.37 [,; 6[1855.65 5945702.74 481 6.00 t0t],82 U~';,5,U0 flq11,2.9'3 lj091 .'lB 13010 55 £; 3~.%.20 P; 611859.82 594570~.37 481., 8.00 ltlH.]l B".;')5.'1(I f)'.lJ.2.HJ'/ LLOH9 ()5 '.L3(11.t U2 ."4 3'/3.4] %'; 611869,64 b.94569fl.24 HS 8.00 ltJ~.2] 6982.87 U~OD.OO;,~LL793 L9 ]3305 ]3 S $).2.'16 E 612760.00 5945420.00 34~ 0.00 111.1)'; M'HIU,(II tlH'J'/.I~ 111.116 2'3 1.1)24 36 ."; 5~;I;.(1'1 tl 617UI3,,.,8 5945401.77 3411 9.00 ll~ I{~ ~976 '2~; Ul{')3.47. 11862.08 '1].13'7 03 S :..,,)/ 49 R 6128'15,]8 5945389.57 [IS 9,QO 112.84 ~)712.0'I 8;J30.(10 12~q4.53 ~]523.2.3 S [039.62 E 6..1.32~D-.~_5.9~.k~.__~.~_ 1.791 0.00 ANADRILL AKA-DPC FEASIBILITY PLAN NOT APPROVED FOP,, E~ ~.~ -"X :CUTION DI ANi 44- ~., ~, Ln -U I,,RO[>O~;I]D 14ELL ;'Ru['.'I LB ~,I~iASURBD INCLN DfR~L'%ON VERTICAL Di~'l'H$ SECTIOn; COORDiNATES-DROI4 A]~ESKA Zone 4 TOOb Db/ D~P'CI( ANGLE AZII4UTH 'rvo SLII~-SRA DBPA~T WELI,~EAD X Y FACE ]00 1~500.00 90.97 1[2.69 8906.79 8~23.92 12309.50 []554.05 S 1114.99 g 6k3365.83 5945[79.50 [79L 8.00 195k2.14 90.00 L~2,67 890f.69 8823.82 12319.]4 L3559.53 S 1126.L9 E 6i~379.%0 5945[74,99 l?9L 8.00 19600.00 82.97 L12.5[ 89L2.07 8829.20 12388.63 13593.20 S 1207.il E 613458.50 59451~2.$3 ]79L 8.00 19045.18 79.36 112.43 89L9.01 8836.14 12423.96 13610.26 S 2248.35 8 613499.99 5945126.09 HS 8.00 20L0~,78 79.36 [12.43 9003.87 892[.00 12781.36 15082,6L S 1665.87 S 613920.00 5944960.00 6L 0.00 20200,O0 86.94 2023@,43 90.00 203~0,00 94.90 ~L 4-;,/2: :,t~R ~]'<ji> 20935.30 95,49 13904.'1'7 83.40 2093!:,.30 95,49 ~21.67 9015.22 8932.35 12855.~2 13818,07 S 1~53.44 B 614008.08 5944925.85 6L 8.00 %11.3$ 9016.24 89]3.37 12885.~.4 13832 L6 S 17~9.]8 E 6~4044.01 $94491~.29 6L 8,00 110.88 9013.61 89%0.74 12933.52 13854 33 S 1846,53 E 61410[.69 5944890.99 6L B.00 110.83 9012.94 8930,07 12939.22 13856 95 S 1853.41 E 614108.61 5944888.47 HS 8.00 1~0.83 8952 80 8~78.00 13422.87 ]4009 L? S 243?.61 E 61~695.00 5944675.00 00ao 1s8.01 8918 87 8~IK,00 7959.2l 9696 LO S 905.2] ~q 611288.49 $949Q~7.39 HS 0.00 110.8] 09~2 8? 8870.00 []422.87 14079 L7 S 2437.61 E 614696.00 5944675.00 mogO (,',:',odt'ik.~ (C>98 W12AP3 3.2C 1:47 AKA-DPC FEASt.?, IL. ITY PLAN NO'T APPROVED FOP, E.)<EC LIT'ION PLAN SHARED SERVICES DRILLING Anadr'jl] Schlumberger VERTICAL SECTION VIEI'I Section at: 150. TVD Scale.' I inch = 800 feet Oep Sca]e.' ~. inch = 800 feet .............l Orawn ..... · O~ May 1998 · .! ~ ~larker Identification ND BKB SECI~ ]NCL' I A) lIE-IN S~VEY 12692 8~26 7536 54 ~ /~t'"~/: :'P' B) lOP ~INDO~ ~2945 8459 7556 53.9 ,~¢,,:~I.L AKA-I)PC l c) KOP CURVE 6/100 12950 8462 7560 53 ' [ .... , .... L2, , t D) END 6/100 CURVE ~3057 ~23 7602 56.2 , G} E~B ~6/~00 gUR~E ,,..~ 8209 7899 83, ,,:= ............. ~:~7~~~' KI END 8/I00 CURVE 15305 8926 8923 76.07 .. . ~ ~,~', . , ..... --' L1 CURVE 9/100 15500 8973 9059 76.07 ~) END 9/100 CURVE 15649 8992 9~64 B9.d N) CURVE 4/100 t5782 8993 9259 B9 .... ~ ........ . D) END 4/f00 CURVE 16480 8951 98~B P~ CURVE 50/100 t6590 8937 9952 97 ~) END lO/tO0 CURVE ~7~32 8928 ~0467 8~,E ..................................................... R) CURVE 8/100 277~3 8991 ~1007 84.~ .................................................. S) END B/~O0 CURVE ~7BlO 6996 11099 90,5 ~) CURVE 9/100 18643 8983 ii793 90.79 U) END 9/100 CURVE ~6934 8~76 11863 97,E ....... ' .... ~ .... ?- .... ~ ........... "- .... I ..... '; ............ V) CURVE 8/I00 ~9416 BBi3 12245 97.E L_ .... ~ ....................... : ........... W) ENO 8/100 CURVE 19645 69~9 ~2424 79 ........... X) ~VE 8/~00 20105 900a 1278~ 79,36 _ ..... Z} lB 4-t/2" L)~ Pl<ll > 20935 B953 13423 95.49 ......... : ........ :~¢-~ ::: :. :_ :_ :_ :_ :_ :::::::::::::::::::::::::::::::::::::::::::::::::::,- ,,. H ] L H N R S T O ~ y Z .......... ~ .................................................................................................... 8000 8,t00 8f~O0 9200 9600 ~OOOO 10400 10800 11200 11600 t2000 12~00 '12800 13,200 i3600 1~000 14400 Sect ion Departure Z 85/81/1998 14'23 907-34~-2160 ANADRILL DPC PAGE 07 SHARED SERVICES DRILLING N- (P3) PLaN VlE · CLOSURE ' 14289 feet at Azimuth ~70.18 DECLINATION' +28.000 (E) SCALE · 1 inch : lO00 feet DRAWN. ' 01 May ~998 __ 9000 Schlumberger Narker Identifi£at~¢n MD N/S E/H hi TIE-IN SURVEY 12892 8954 S 459 B) lOP W~NCOW 12945 8992 S 480 C) KOP CURVE 6/~00 12950 8995 S 482 D) ENO 6/100 CURVE 13057 9070 S 528 El 7' CSG Pl <Il> ~3543 9400 S 760 F) CURVE I8/100 13643 9468 S BOB 6) END lB/100 CURVE J38]8 96;4 S 878 H) CURVE 8/t00 244;8 JO~8~ S 2063 I) END 8/;00 CURVE 14614 ~0368 S ~28 J] CuRvE 8/100 ~5022 10759 S ~280 K) ENO 8/100 CURVE 15305 1~030 S ;290 L) CURVE 9/100 15500 12224 S 1336 M) END g/100 CURVE ]5649 J~357 S t373 N) CURVE 4/~00 15782 ;1485 S 1407 O) END 4/JO0 CURV~ ~6480 J2;75 S ~425 ! 12500 13000- 13500- 1~000- ' ' P) CURVE ;0/t00 J6590 ~2282 S J402 N [ fl) CURVE 87100 17;~93 129~0 S 482 ,t S) ENO 8/503 CURVE 17[~10 530~4 5 373 T) CuRvE 9/100 18f 43 J33D5 S 5t3 ,, v) CURVE 8/100 i 19, 18 135~3 ~ ,040 / wi END 8/J03 CURVE ~ t9[ 45 J36~O-S i248 x) CuRvE 8/~00 I 20:05 t37~3 S ,666 t ~ ?1 ~FNn fl/~]] CUnvF ~ 203o7 · . ~ Z) f3 4-1/2" LNR PT II > 20~35 ~40 9 S 438 , ,. i 1 .<, xQ-x.IFD FOR I :, TREE: 4-1/16" x 5M psi FMC VVELLHEAD: 13-5/8" x 5M psi FMC Actuator: Baker ,12a EHST (Propo 6.8PPG DIESEL KB. ELEV = 49.69' ORIGINAL KB. ELEV = 49.03' BF. ELEV = 20.81' DIESEL FREEZE PROTECTION AT +/- 2200' MD NIPPLE @ 2200' 13 3/8", 68#/ft, L-80, BTRS @ 3027' 6 - 4.5" X 1" GLMS's 4.5", 12.Gfl/ft L-80 Mod-But Tubing CEMENT PLUG FROM 13080'-12745'. KICK OFF @ 12945' SECTION MILLED 12900'- 12945' FOR KICK OFF @ 12945' 8.5PPG SEA~¥ATER ~. ....................... 7" x 9-5/8" LINER HANGER/PACKER @ 12445' 4-1/2" x 7" PRODUCTION PACKER @-13161' 4-1/2" LINER HANGER 6" TD @ 21058' @ 13393" 4-1/2", 12.6#, L-80 Mod-But SOLID LINER EZSV RETAINER @ +/-13080' TUBING CHEMICAL CUT @ +/-13130' 3-1/2", 9.2#/ft, L-80, TDS TAILPIPE TUBING TAILWLEG @ 13214' 5-1/2" LINER TOP @ 13209' 9 5/8", 47#/ft, NT80$, NSCC @ 13403 8-1/2" TD @ 13543' 4-1/2" X/Paoker/X/XN WOA TAILPIPE@ -13293' (Stabbed into Tieback) 9 5/8" OTIS MOM PACKER, -- W/3.85" ID @ 13136' 3 1/2"'SWS'X NIPPLE, 2.75" ID @ 13181' ~3 1/2"'SWS' X NIPPLE, 2.75" ID @ 13203' Squeezed perforations from 13715' - 13846' PBTD @ 13933' TD @ 14057' ~- 5-1/2", 17#, NT80S NSCC @ 14O57' DATE REV. BY COMMENTS PRUDHOE BAY UNIT_ 8-25-98 WEE Proposed Status ......... .WELL; W-12a ...... APl NO' 50-029-22022 BP Ex~)loration (Alaska)' IWell Name: I W-1 2a Well Plan Summary Type of Well (producer or injector)' I Producer Surface Location: 3738' FSL, 1196' FEL, Sec. 21, T11N, R12E X = 612049.02, Y = 5958715.07 Tie-in Survey: 63' FSL, 1675' FEL, Sec. 28, T11N-R12E X = 611723.66, Y= 5949756.00 Target Start Location: 4684' FSL, 2096' FEL, Sec. 33, T11N-R12E X = 611334, Y = 5949090 Bottom Hole Location: 218' FSL, 4070' FEL, Sec. 34, T11N, R12E X = 614696, Y = 5944675 I AFE Number: I 4P1035 I Estimated Start Date: I 9/20/98 KOP MD: TD MD: 12945' 20935' I Well Design (conventional, slimhole, etc.): I Rig: I Nabors18E Operating days to complete: 136 KOP TVD: TD TVD: 8379'ss 8870'ss RKB/ Surface Elevation (a.m.s.I) 83.25' ~,7.83' Extended Horizontal Sidetrack Producer Objective: I Selectively geo-steer well to optimally drain 4 - Ivishak Zone 4 targets Formation Markers Formation Tops MD TVD (SS) Kingak D 8316 Tie-In Survey 12891 8345 Top Window 12945 8376 KOP 12950 8379 Curve 6°/100' 13057 8440 End 6°/100 curve Kingak C 13161 8498 Kingak B 13298 8574 Top Sag River 13535 8706 7" casing point 13543 8710 13643 8766 Curve 18o/100' 13818 8826 End 18°/100' curve 14418 8895 Curve 8°/100 14614 8892 End 8°/100' curve 15022 8722 Curve 8°/100' 15305 8923 End 8°/100' curve 15500 8722 Curve 9°/100' 15649 8909 End 9°/100' curve 15782 8910 Curve 4°/100' 16480 8868 End 4o/100' curve 16590 8854 Curve 10°/100' 17132 8845 End 10°/100' curve 17793 8908 Curve 8°/100' 17910 8913 End 8°/100' curve 18843 8900 Curve 9°/100' 18914 8893 End 9o/100' curve 19418 8830 Curve 8°/100' 19645 8836 End 8°/100' curve 20105 8921 Curve 8°/100' 20307 8930 End 8°/100' curve 20935 8870 TD Casing/Tubing Pro,c ram Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MDR'VD M D/TVDss 8-1/2" 7" 26# L-80 BTC 748' 12795'/8370' 13543'/8710' 6" 4-1/2" 12.6# L-80 I BT-Mod 7542' 13393'/8627' 20935'/8870' tubing 4-1/2" 12.6# L-80 I BT-m od 13390' Surf. 13390'/8625' General Mud Program Intermediate Mud Properties: Fresh Water LSND 8-1/2" hole section Density Viscosity Yield 10 sec 10 min APl HTHP (PPG) Point gel gel Filtrate Filtrate LSND 9.9 38-42 8 - 15 5 - 8 11-15 4 - 6 <10 Production Mud Properties: Quik Driln/Brine 6" hole section Density Viscosity Yield 10 sec 10 min pH APl HTHP (PPG) Point gel gel Filtrate Filtrate 9.0 32-35 8-12 3-8 5-15 8-9 4-6 10-12 Directional KOP: Maximum Hole Angle: Close Approach Well: ___12945' MD (estimated) 97.5° None Cement First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 7" Intermediate Premium Tail: None Single Stage, Single Slurry Job 105/15.8 / 1.14 Full cement across liner interval (748') 4-1/2" Liner 848 / 15.8/1.19 None 150' liner lap, TOO 200' above TOL, Class "G" cement, 50% excess in open hole Logging Program LWD Logging: 8-1/2" Hole MWD/GR/ directional 6" Hole MWD lAB directional / GR / Res Open Hole Logs (eline): 8-1/2" Hole None 6" Hole 1) DPC Platform Express (GR/RES/LDT/NUE/Sonic), Possible RFT's Cased Hole Logs (eline): None Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics will be provided when determining rig (rig will be in the current fleet of north slope rigs and the schematics should therefore be on file with AOGCC). Maximum anticipated bottom hole pressure is 3933 psi at 8800'TVDss. Maximum anticipated surface pressure assuming gas in entire annulus (0.1 ppg) is 3053 psi. Hazards · This well will penetrate ,-,600' of lower Kingak at 56° in the 8-1/2" section. Good drilling practices, including optimized flow rates of 410-430 gpm, slower trip and connection speeds, pumps at 40% when reaming connections, larger nozzle area for reduced sidewall erosion, all will Assure a trouble free interval. · There are 4 known faults in the reservoir interval ranging from a 20' through to a 90' throw. Lost circulation across the faults which will be controlled with productive zone LCM pills and/or weighted seawater for reduced fluid loss expenses. Low reservoir pressure and lost circulation due to Iow pore pressure within the reservoir interval. Disposal Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC- 2A for disposal. W-12a Short Well Summary Pre-Rig Work: NOTE: If any problems are observed with the 95/8'' packoff during pre-rig operations, notify the Operations Drilling Engineer, Nabors 18E Company Representative and the wellhead manufacturer. Repairs will be made prior to initiation of rig work. 1. RU wireline and retrieve SSSV at 2278'. Test 9s/8'' and tubing packoffs to 5000 psi and function LD screws. , , MIRU electric line and cut 31/2'' tubing at 13,130'. (Note: Utilize most efficient cutting mechanism. Remaininq tubing below cut will not be further utilized) RD electric line. Circulate seawater through cut until clean returns are observed. Freeze protect tubing and annulus to 2200' with diesel. Bleed pressures on tubing/annulus. Zero pressure on all annuli is required. 4. Set and test BPV, remove well house and flow lines, level pad and dig out cellar. Notify Operations Drilling Engineer upon completion of work. Rig Work: 1. If 95/8'' packoff does not test during pre-rig, contact the wellhead manufacturer's representative to initiate repairs. . . . . . . , MIRU. Pull BPV and set and test TWCV to 1000 psi. ND tree and NUB©PE and test same per SSD policy. Pull TWCV. Circulate out freeze protection with seawater and attempt to pull 31/2'' tubing. As indicated, Kinley surveys and video camera's indicate substantial tubing degradation and therefore additional fishing runs may be required to pull tubing. Have grapple and spears available to fish remaining tubing, if necessary. RU wireline and make a CCL/gauge ring/junk basket run to 13090'. RD wireline. PU 9-5/8" EZSV cement retainer on drill pipe and RIH. Set retainer at 13080' (50' above cut per AOGCC 25.105.h.2) and test above retainer to 3000 psi. If test is not achieved, PU 9-5/8" RTTS to isolate leak and remediate as necessary. Upon determination of leak and successful remediation, proceed to step 5.. Establish injection into perforations and pump 33.6 bbls of cement (includes additional 5 bbls for squeeze) below retainer. Sting out of retainer and circulate a minimum of 3 complete circulations (long way) through drill pipe prior to POOH. RIH with section milling BHA. Spot 18 ppg milling fluid from PBTD to 12945'. Mill Iow side window per directional program. POOH with milling assembly. RIH open ended and wash to top of retainer. Spot a 31 bbls balanced cement plug to bring T©C to 12745'. POOH to above plug and perform hesitation squeeze to achieve final squeeze pressure of 2000 psi. POOH. PU 81/2'' BHA and RIH. Displace wellbore to drilling fluid and drill 81/2'' wellbore to 13643' md. Run and cement 7" casing to TD. Drill out 7" casing plus 20' of new formation and perform FIT to 10 ppg. Drill 6" undulating, horizontal wellbore to 20,935' using lAB and GR/Res for directional control. 10. Log well with drill pipe conveyed Platform Express with sonic. Run RFT's as required. 11. Run 41/2'' solid liner to TD and cement. Drill pipe convey perforate based upon Iog/RFT evaluation. 12. Run 41/2'' L-80 completion with 7" x 41/2'' production packer and standard WOA tailpipe with WLEG. Circulate freeze protection to 2200'. Land completion and set packer. 13. Set and test TWCV to 1000 psi. ND BOPE, NU Tree. Pull TWCV and set/test BPV. RDMO. Anad,'i ] 1 Schlumber.qer A] azka District 1Lll East 80th Avenue Anchorage, AK 99518 (907) 349-45[1 Fax 344-2160 DIRECTIONAL WELL PLAN for SHAR~,D SERVICES DR£LLIN~G Field ........ : Prudhoe Bay, Cc<-~putaL[cn..: ~,L~nimu~ Curvature Un/ts ........ : FEET Su:face ~t..: 70.296~5407 Surface ~ng. : 1.%9.09267115 Legal Description Surface ...... : 3738 FSL 1196 FED S~1 T/I}~ Tie-£n ~,rvey: 6] FSL 1675 FSL S~8 TLI}~ Targe~ Start.: 4684 FSL ~096 FE:I, S33 TI1N B}~ .......... : 218 F'SL 4070 FEL S34 %[1~; iOCAT/ON$ - /kLASKA Zone: 4 X-Coord Y-Coord 6L2049.02 5958715 6 LL723.56 5949756.00 6 k1514 .00 5949090.00 614696 .O0 5944675.00 Prepared ..... : 01 [~ay 1998 ~ert sect az,: 150.13 Kg elevation.: 82.87 ft Ha~ne~£c Dcin: +28.000 Scale F~ctor.: 0.99991426 Convergcnce..: ANADR;LL AKA-DPC FEASIBILITY PLAN Nor VERTI~L-DE~HS SECTION C~ORD1 ~TE$- FRO~ ~' T~ SUB-SP~ DEPOT R~LLHE~ X Y FACE S'LA'I' I ON ~fEA SUT~ D INCLN DIRECTION I DE,?F [ F iCA/ION DEPTH ~GLE AZI~H 'r,312, 8398.87 83~6.00 TIE-I¢~ SURVEY )2flgl.fl0 54.78 209.73 8427.62 8344.75 ~535.9] 8955.99 S 459.02 ~.; 611723.56 B949756.00 / 12~OO.0~1 5'1.65 ~09.47 8,%32.36//~.549.~9 7539.3~ 8959.81 S 462.32 %'; ~:o~ c.,~,~.,,,, ~/:oo ~o.oo ~.~ ~o~.~..~~ ~-,~ ~ .,~o.~o~.,~ ~ ~.~.~',:.: 0 67 B407 80 ~581.14 9030.76 S 5Ol..fl? ~'~ Et,:B 6/100 ~k~TE 13056 94 56.22 21~315" 8522 87 8440 O0 7602.37 9070.02 S 527 6] TJC 1316i.24 56.22 ..,'" 215.15 8580.87 8498.00~ 7638,97 91~0.89 S 577.53 671720,34 S9497SO.13 611703.24 5949717,84 611701.40 5949714.24 611681.86 5949678.6] 631656.71 5949638.97 611607.86 B949567.37 1211 0.00 121L 3.04 £201 3.04 TLR 3.04 69R 6.00 MS 6.00 ;IS 0.00 (Anadr£LL (c)~B W12A?3 3,2C ~'47 PM P) I> Z I> -G ]> 6') Fq 81 ~lay 1998 l:'ag'e 2 PROPOSED I';MLL PROFILE STAT[ON NEASURED [~tCGI{ DIRECTION VERT£CAL-DEPTH$ SECTION COORDINATH$-FROM A/_.~SKA Zone 4 ~OOh DL/ [D~IeFIF[CATION DEPTH ANGLE AZEMUT~ TVD SUB-SEA DZPAP~T 9JELLED X Y FACE t00 TJB 23297.9l 56.22 215.15 E656.89 8574.00 ~686.93 9233.77 $ 642.93 ~{ 621543.85 5949473.54 ~IS 0.00 TOP gAG ]35.15.29 56.22 215.15 8788.87 8706.00 7770.23 9395.08 g 756.53 W 621432.68 59493[0.5~ ~ 0.00 7" CSx3 PT </]> 13543.00 56.22 215.15 8793.16 8710.29 7772.94 9400.31 S 760.22 W 611429.06 5949305.27 HE 0.00 Ct~VS 18/100 13642.85 56.22 215.15 8848.68 8765.8/ 7807.98 9468.17 S 808.0~ W 611382.30 5949236.72 34L 0.00 1.3650.00 $7.28 214.]0 8852.60 8769.73 7810.54 9473.08 S 011.41 W 6~l]78.97 5949231.7~ 341 18.fl0 t36'/5,90 6t.06 t3700.00 64.90 k3725,00 69.78 L3750.00 72.89 13775.00 96.63 2k5.45 8865.41 8782.54 7~20.38 9491,1.1 S 8~3.05 ['; 681367.60 5949213.56 321 18.00 2~8.8L 8976.77 8793.90 7831.52 9510.37 S 834.22 t'; 611356.72 5949194.34 31L 28.00 206.32 8886.60 8803.7~ 7843.89 9530.74 S 844 85 ~q 6/1346.40 5949173.61 301 28.00 203.97 8694.85 f18Li.98 7857.43 9552./0 S 854 87 W 611~36.70 5949152.11 291 18.00 201.71 890i.46 88~8.59 7872.03 9574.]2 S 864 22 W 6123~7.68 5949129.~6 291 18.00 CURVE CU:WE 8/100 ]3800.00 80.59 199.53 8906.40 8823.5b 7887.62 9597.25 S 872 ~5 W 611319.40 5949L06.70 281 L8.00 13817.7'2 83.40 198.01 8~08.87 8826.00 7899.22 9633.86 S 8~8 49 W 6113[4.00 5919090.0[ ~S 18.00 138~7.~3 ~3.40 198.01 8908.87 ~826.00 7699.22 9613.87 g 878.49 W 6113T4.00 59&9090.00 HS ~8.00 144[8.35 83.40 198.01 8977 87 8895.00 I 8299.33 10381.23 S £062.99 }~ 611118.00 5948520.00 1IL 0.00 14500.00 89,78 196.59 8992 72 8899.85 8354.73 10259.05 S 1087.23 W 611i14.93 $948~41.84 I~L 8.00 END 8/100 CURVE CtFRVS 8/100 14502.78 90.00 19f.$5 8982 73 8899.86 8356.65 10261.71 S 1088.02 W 6llll{.17 5948439.16 121 8.00 14600.00 97.59 194.86 8976.30 8893.43: 8424.50 1035S,02 S ~114.26 ~ 6lk089 33 5948345.48 151 8.00 14613.61 98.66 194.62 897,4.37 889'i.50 ~ 8~34.O9 10368,0~ $ 1117.68 9; 61L086 10 5948332.40 }IS 8,00 15022.29 98.66 ~94.62 8912.8'7 8830.00 87~2.34 50759.0k $ 12~9.63 {'; 6i0990 O0 5947940.00 ~791 0.00 'L5L00,00 92.44 194.53 8905.36 8822.49 877'7.54 1~833 83 $ 1239.08 W 610971 67 5947864.91 ~791 8.00 9/100 ENl., 9/100 [5~30 .49 90.00 t!,200 , O0 84 .44 ~ 53(10 .00 76.4'1 I bS(;.I ~,1 76 .07 15500 ;~6 76 .07 '1',600,00 85.04 356.13 95 89 ;.1!16,1 fl . 96 89 (An~adr£ll (c) 9(3 ;tl2AP3 3 ,20 1:47 PM P} 194,49 8904.71 882L.04', 8799.32 10863 34 S 1246,7L W 610964 48 5947835.29 1791 8.00 L94 .4k 8908.08 8825.2'1%, 08,)8.97 10930 5~ S 1264,03 W 6~0948.~6 5947769.~4 ~791 8.00 1,94.30 8924.68 8841.8'1. 89/9.58 11026.00 S 1280.46 W 610925.[6 594767~.04 2791 8.00 1,).1.2'~ [}')7r,.TH 81%,1'2 91 t1922.f12 11.030.36 S 1211q.57 W 61(19,14.[2 5947667.67 I{S 8.0(I ).94 .29 ~9'12.~7 8890.0~ 9059.02 '1. i2/4.36 S 1.336.44 h' 6208~0.00 5947483.00 2]( 0.00 ,, . ].94.66 8989.22 890(J,Sb 9129.32 11309.53 S /361.0L kt 61,0856.85 594738'1.49 21 9.00 394.83 899L.58 8908.71 91.64.11 11356.80 S 1373.45 W 610845.12 5947340.04 NS 9.00 194.83 899~.58 8901.7'/"~ 9164.13 LI. 356.R0 S 1373.4 ,PI 6L0~45.12 5947340.03 HS 9.00 .. ANADRi[.L AKA-DPC I:'EASIBILITY PLAN NOT APPROV[D EXECUTION DI Akl ~ ~ ~ ~ I-'f-,'.OL:>OSED H~:[,l, PROPIL, B STATION hlE:ASURED £NC~ D£RSCT]ON VERTICkL-DE~F~S SECTION COOR.I)II{ATE$-FROF1 AhASKA ~ne ¢ TOOL Db/ ID~VFIFICAI'[OI{ DEPTH ~GLR AZIMUTH TV~ $b'B-S~ DEPART ~fELLK~AD X Y FAC~ ~mm CURVE 4/100 157~!.94 89.44 194,83 899~.87 8~10.00 9258,63 3]485,35 S 140~.49 W 6108~3.00 59~72L1,QO 731 0.OO %5800.00 89,65 194,14 8993.01 8910.14] 9271,54 11502.83 S 1412.0L W 6k0808.~4 5947~93.45 731 4,00 [58~9.84 90.00 ~93.00 8993o10 8910.~3~I 9293.21 11531.84 S 1419.01 H 61080~.18 5947164.35 731 4.00 ~£900.00 90.8~ 190~31 8992.60 8909.73~ 9345.73 11600,55 S 1433.18 ~ 610789,03 5947095.45 g3L 4.00 k6000.00 9[.98 186.48 8990.17 8907.30 I 9424.20 ~[699.42 S 1447.78 H 630975.9~ 5946996.37 731 4.00 16100,OO 93.]3 162~0.O0 94.26 16300.00 95 38 ]6400.00 96 ~8 164~0.39 97 3~ 182.65 8985,71 8902.84 9506.57 lk790.99 S 1455.74 W 610769.44 5946896.71 731 4,00 1'78.81 8979.26 8fl96,39 9592.45 /1098.75 G 1457,O1 W 610769.6~ $946796,95 741 4.00 174.95 8970.85 8887,98 9681.41 i1998.23 S ~451.$9 W 610776.55 5946697,57 $41 4,OO 171.O8 8960.51 88'?';.64 9773.03 12096.93 S 1439,$l W 610790.11 5946599,06 741 4,00 167.96 0950.85 ~86'1.98 9848,30 32175,4~ S 1~5.00 W 6[0805.78 5946520,82 HS 4.00 CURV?: EH'D IO/'LO0 CURV~ ('IIRVH ,q/iL O0 16589.86 97 34 16600.00 9'7 12 16700.00 94 16800.00 92 51 1690C~0 90.06 16902 43 90.00 17000 OO 87.61 17300 OO 85.23 17131 57 84.50 ]77~:1 '75 84 50 167.96 8936.8'; 8854.00 9351,65 1~281,69 S 1402,36 ~'; 6[0830,O0 5946415,00 1021 O.00 166.96 8935.59 8852.72 9961,25 12291.~1 S 1400.17 ~ 61083~,33 5946405.21 1021 ~0.00 157.16 8925,51 8842.24 ~0058.43 12385.90 S 1369.57 H 61~864,34 594631~.20 103b 10.00 ~7.43 8918.65 8835.78 10158.03 12474.13 S 1323.22 ~ 630911.99 ~946223.68 1041 [0.00 137.73 8916.4l 8833.54 10257.01 12553.~2 S 1262.55 W 610973,84 5946145.30 1041 10.00 137.49 89~6,41 8833.54 10~59.38 12555.22 S 1260,~1 W 610975.50 59~6143,53 [041 10,OC 128~03 8918,45 8835,58 i 10352.3~ ~2621.37 S 1189,38 W 61i048o00 5946078.46 104L 10,O0 118.30 8924.70 8841,83l{ 10441.21 12G75.91 S 1105,95 W 61l[32.23 5946025,~7 1031 10,O0 115,~1 8927,53 8844,66 10467.47 [2690,06 S 1077,87 W 6li160.51 5946011,44 ~S 10,O0 1}5 PL 8990.87 890f].00 11007 14 12970.43 S 482.44 W 6'1i760.OO 5945740,00 481 O.O0 Ct:kVE 9/LDO CU~{VH U/l 17800 00 84 89 17D95 59 9~ OO l 'l¢)O0 00 90 · ~4 119 I () ~ 1 90 79 l~t a,13 l0 90.79 !9,117.95 9'!.53 (A3~adri]] (c)98 W]2AP3 3,2C 1:47 PN P) 114 78 8991.54 8908.62 11013 04 1297],48 S 475.90 W 611766,59 5945737,05 481 8.00 109 08 8995.80 8912.93 ]1088 O] 13~09.]2 S 387.37 H 611855.63 5945702.74 481 6.00 [08 62 8995.80 8912.93 1309.1,35 13010.55 S 383.20 H 611859.8~. 5945701.37 48b 8.00 1~1~1 21 09';5.70 fl'.}l,2.Lt3 '~ 110~3~ Ob :[3~13,~'2 -q 3'/3.43 %'; 611869.64 b.945698.24 I[S 8.0~ l(J8 2] 8982.87 89OD.0OJ,~/1793 19 ]3305.]3 $ 51,2.'/6 [{ 612760.00 5945420.00 34R 0.00 i 111 I~'~ B!)130,(ll tlH')'I.14 11U36 25 1.1)24.36 ~'; 561;,(1'1 E 61~01J.t, 8 5945401.77 34R 9,00 ll~.f{4 fl976.'2!1 ~1~.~')3.42 3.1062.BB 13.137.03 S 5!)'/.49 B 612845.18 5945389.57 lis 9,aO 112.84 8~12.8'1 B;330.(IO .12244.53 13523.23 ,q 1039.62 E 6.'].3~-OXl-5.9_lfi2.k9_,_g.O 1.'791 0,OO ANADRtLL AKA-DPC FEASIBILITY PLAN NOT APPROVED FOR EXECUTION PI A I',,.I ~ ~ .., ~'. I> ~;.].2A (P'l) (31 ~4ay :1998 Page ,~ PRO~5;ED ~LL I'~)PILB [DSNT I F I CAT ION 1.9500 .OO 1.9S 22.14, 19600 ,00 END 8/]00 CURVE 19645, CU~V~ 8/),.00 201.04 ]~CI.N DIRECtiON VERTICALDi~FI'HS gECTIOtl ~20GLR AZIMUTH TVD SUB-SRA DEPART 90.97 112.69 8906.79 8R23.92 52309.50 90.00 kk2.67 8905.69 8823.82 1~3[9.]4 82.97 [[2,5[ 89[2.07 8829.20 12188.63 79.36 ~12.43 8919.01 8836.1~ 12423.96 79.56 ~12,~3 9003.87 892t.00 19781.36 ged B/]Or) CURv',E TOP SA.I)L~ ~.OCH I'U 20200,00 86.94 ~0238,43 90.00 ~0300.00 94.90 2030').39 95.~9 20935.30 95.~9 13904.7'7 20935.30 9S.49 211.67 9015,22 B932.35 12855.32 111.33 9016.24 8933.37 12885,%4 120.8B 9053.62 89%0.7~ 129~3.52 120.83 9022.94 8930.0P 12939.22 130.83 8952.89 8570.00 11422,87 198.01 8928.87 883g,00 795~.2l llO.g~ 09¢2,87 8870,00 13422.87 COORDiNATES-PROM ALASKA Zone 4 TOOL Db/ WELLheAD X Y FACE ]00 I~554.05 S 1114.99 E 613365.8] 5945~79.~0 179D 8.00 t3559.53 S 3126.[9 B 6[~37~.%0 5945[74,99 Iq9L 8,00 15593.20 S 1207.k1 E 613~58.50 59451~2,53 179h 8.00 l~61~,~6 S 1248.35 B 613499.99 5945126,09 HS 6.00 13Q82.6t S 1665.87 S 613920.00 B94495~,O0 6L 0.00 13818 07 S 13856 95 S 1753.~~, 1789.18 1846.53 1853.41 614008.08 £944925,85 6h E.00 614044.01 594~912.29 6h 8.00 61~101.69 5944890.99 65 8.00 614106.61 5944888.47 HS 8.00 614696.00 594~675.0~ 0o00 9696 ~0 S 905.2] W 611288.49 59490~7.39 14079 L7 S 2437.61 E 614696.00 5944675,0Q '--'~,',.-. ~,.~ ~..u AKA-DPC F' A.SI',21L. IT¥ PLAN 'NOT APPROVE FOR E)(ECL;TI PLAN '~.~-,,-,,,.~.,,~ ,, SHARED /~nadr i ] ] Schlumberger SERVICES DRILLING , _ , i W- 2A (P3) VERTICAL SECTION ,._~..- - _ ~,::.~ , · _ Sect ion at' 150.13 VIEW J / TVD Scale.' i inch = 800 feet JOe¢ Scale.' 1 inch : 800 feet I I ........., ~larker Identification ND BKB SECI~t ]NCLN . I A) TIE-IN S~VEY 12B92 842B 7536 54.7B ..................... , ..... ~ ..... B) lOP MINDD~ ~2g45 8459 755B 53,96 , At',J/, :'c" ~ c) KoP CURVE 6/~00 ~2950 ~462 , ~¢'~[.[ AKA- )PC ~ . ----- '~ F ~ A <' ~.~ I D) END G/lOg CURVE ~3057 m23 7602 56,22 6} END fB/~O0 CURVE *~ 8B09 7899 83.40 ....... ~'?~' >'~m.-..~ .... ~'~"~(~:'~ ~ "H) CURVE e/~oo 144tB 8978 8299 83.40 ~ ~) END 8/tO0 C~VE t4614 B974 B434 98,66 , 6BO0 ............................ ~:~ ............. .%:~~~'~ ' K) END 8/100 CURVE 15305 8926 B923 76.~ 7 ....... :~='¢~';"'"='-J L1 CURVE 9/100 15500 8973 905B 76.~ 7 j b~) END 9/100 CURVE 15649 8992 9164 89. 4 ...... N) 6URVE 4/100 15782 8993 9259 89. 4 7200 ......... D) END 4/~00 CURVE 16480 8951 98aB 97 4 P) CURVE ~0/~00 tCBgO. 8937 9952 97,34 D) END lO/lO0 CURVE ~7132 8928 ~0467 84.50 ~ .................................. R) CURVE 8/100 }77~3 8991 ~1007 84,50 rC~T,E~¢-S~ ................. 5) ENB B/~O0 CURVE )7910 B996 ~099 90, ~) CURVE 9/tO0 ~8843 8983 ii79~ 90.79 U) ENB 9/i00 CURVE ~8934 8976 11863 ~-r7-~¢ L i ........... ="'-- L v) CURVE 8/100 ~94iB BB~3 12245 97,53 ' _ .................... W) ENO 8/100 CURVE 1964~ BB~9 12424 79,36 'L~q;.~P~ ..... X) ~VE 8/~OD 20tO~ 900~ 1278~ 79,36 >~ ~*-¢~ ........................................ Y) E~ 8/~00 CURVE 20307 9013 1~39 g~.49 Z) ID 4-1/2" L~ Pr<l I> 20955 89531342395,49 .............................................. ~ '~ ..... i i i i i i i i i i i iii i i ii iii i i~ i i i ii i i i i i'! ] i ii 2 ' T-~_. _ ,, ................................................................................ )- ~ '" , .......... 7200 7~00 8000 8400 8¢~D0 9200 9600 ~OOO0 I0400 10800 t~200 11600 12000 ~2400 '18800 ~3200 13600 ~4000 ~400 Sect ion Oecarture PAGE 07 SHARED SERVICES "DIqZ-LLING 12A (P3) PLAN VIEN ii _ ~ _ i il CLOSURE ' 14289 feet aL AzimuLh J70.18 DECLINATION' +28.000 SCALE ' I inch = lO00 feet BRAWN. · 01 May ~998 · i ii AnadPill Schlumberger Hanker Identifi£ation ND N/S E/H A) TIE-IN SURVEY 12892 8954 g B) TOP WINCOW ~2945 8992 S C) KOP CURVE 6/I00 12950 8995 S D) ENO 6/100 CURVE ~3057 9070 S E) 7" CSG PT <11> ~3543 9400 S F) CURVE I8/100 13643 9468 S G) END 18/100 CURVE 138J8 96~4 S 878 H) CURVE 8/100 14418 10~81S 1063 I) END 8/100 CURVE 14614 10368 S 1118 J) CURVE 8/100 i5022 10759 S 1280 K) ENO 8/100 CURVE 15305 11030 S ~290 L) CURVE 9/100 15500 11214 S 1336 M) END 9/t00 CURVE ]5649 11357 S ~373 N) CURVE 4/t00 15782 11485 S 1407 O) END 4/J00 CURVE 16480 J2J75 S I425 P) CURVE ~0/~00 J6590 J2282 S 1402 480 482 W 528 W 760 W 808 H 8000 8500- , R) CURVE 8/'100 ~7l 93 ~29 482 ,' S) ENO 8/~0) CURVE 17! JO 130~ ; 373 , T) CURVE 9/ O0 18~ 43 133p5 S i513 I , v) CURV~ ~/too I 19, ia j~3_~ ,0~0 E · x) CURVE 8/[100 . 20:05 t37 S 666 E I -~P Z) Ta 4-1/2r" LNR PT~II> 20~35 140~9 S 438 E __ .~ _ ~ ' ,, - -I ................ r ..............~ ............... 1 -} ~.'~2 ,d,~,i-)pl;l I ~ A-g A-DFC t ' .., ~(.)}' ,-. , . _ . i ' ~ ' ~ ...... '~... ......... -. -" i I ~ , I I . , : 2000 1500 1000 500 0 500 :000 ~500 2000 2SO0 300¢ ~500 4000 TREE: 4-1/16" x 5M psi FMC ~NELLHEAD: 13-5/8" x 5M psi FMC Actuator: Baker 12a EHST (Propo KB. ELEV = 49.69' ORIGINAL KB. ELEV = 49.03' BF. ELEV = 20.81' 6.ePPG DIESEL DIESEL FREEZE PROTECTION AT +/- 2200' MD 'X' NIPPLE @ 2200' 13 3/8", 68#/ft, L-80, BTRS @ 3027' 6 - 4.5" X 1" GLMS's 4.5", 12.6#/ft L-80 Mod-But Tubing CEMENT PLUG FROM 13080'-12745'. KICK OFF @ 12945' SECTION MILLED 12900'- 12945' FOR KICK OFF @ 12945' 8.5PPG SEAWATER ~ ......................7" x 9-5/8" LINER HANGER/PACKER @ 12445' 4-1/2" x 7" PRODUCTION PACKER 8-13161' 4-1/2" LINER HANGER 6" TD @ 21058' @ 13393" 4-1/2", 12.6#, L-80 Mod-But SOLID LINER EZSV RETAINER @ +/-13080' TUBING CHEMICAL CUT @ +/-13130' 3-1/2", 9.2fl/ft, L-80, TDS TAILPIPE TUBING TAIL W~'LEG @ 13214' 5-1/2" LINER TOP @ 13209' 9 5/8", 47#/ft, NTe0S, NSCC @ 13403 8-1/2" TD @ 13543' 4-1/2" X/Packer/X/XN WOA TAILPIPE@ -13293' (Stabbed into Tieback) 9 5/8" OTIS HCM PACKER, W/3.85" ID @ 13136' 3 1/2"'SWS'X NIPPLE, 2.75" ID @ 13181' ~3 1/2"'SWS' X NIPPLE, 2.75" ID @ 13203' Squeezed perforations from 13715' - 13846' PBTD @ 13933' TD @ 14057' ~. 5-1/2", 17#, NTe0S NSCC @ 14057' DATE REV. BY COMMENTS PRUBHOE BAY UNIT_ 8-25-98 \NBL Proposed Statu"s WELL; W-12a AP! NO' 50-029.22022 ................................ BP Exploration (Alaska) Alaska hared ervlces rilling WELL NAME W-I2A DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT l'~! Permit Documentation Prepared: ODE: William Lloyd Date:9/1/98 [~Pe~t Application Revi~,w~ed: SDE/ES: ~-----"~__-en,,,~"~ Date.~!~)o,.~. me~t)pplicati~ Su~JJed: Dateg~ PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: I['~ SUNDRY NOTICE '--I Sundry Documentation Prepared: ODE: Date: I~l Sundry Application Reviewed: SDE/ES: Date: I~ Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate Pull Tubing Stimulate Variance Other(Explain): R [~'~'r [: !V F=,, D APPROVAL TO PROCEED ,. hared .r)/ices a nlling WELL NAME DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET '1 IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) [~] DRILLING PERMIT ['~] Permit Documentation Prepared: ODE: William Lloyd Date:9/1/98 I~Permit Application Revievw~ed: SDE/ES: ~-----------~ -- ~"~ · -.'"'"'~""~ [:~ Permit Application Su~ ,mi~ted: · TA: ~.('L3~'LT~.~ ~~(~ Dategt~ F-] PRE-RIG WORK ~-] Pre-Rig Memo Reviewed: SDE/ES: Date: ~-~ Pre-Rig Memo Sent to Slope: ODE: Date: [~ Pre-Rig Sundry Documentation Prepared: ODE: Date: ~'~ Pre-Rig Sundry Application Reviewed: SDE/ES: Date: ~] Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE ~'] Sundry Documentation Prepared: ODE: Date:~ ~'l Sundry Application Reviewed: SDE/ES: Date:~ [-~ Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimu'~ EC E ~V E D Alaska 0il & 6as t.;ons. Anchorage APPROVAL TO PROCEED I I Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATIO~ J-CoMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging I~]Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1542' SNL, 1196' WEL, SEC. 21, T11N, R12E, UM At top of productive interval 505' SNL, 1919' WEL, SEC. 33, T11N, R12E, UM At effective depth 716' SNL, 1982' WEL, SEC. 33, T11N, R12E, UM At total depth 734' SNL, 2026' WEL, SEC. 33, T11 N, R12E, UM Type of well: [~ Development [--~ Exploratory I--I Stratigraphic [-]Service . Datum Elevation (DF or KB) KBE = 91.07' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-12 9. Permit Number : 90-32 10. APl Number 50-029-22023 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 14075 feet 9180 feet 13994 feet 9126 feet Length Size Structural Conductor 110' 20" Surface 2990' 13-3/8" Intermediate 13446' 9-5/8" Production Liner 866' 5-1/2" Plugs (measured) Junk (measured) Cemented 4338 sx Coldset II 1211 sx Class 'G' 250 sx Class 'G' 147' 147' 3027' 3027' 13483' 8792' 13209'-14075' 8620'-9180' Perforation depth: measured 13715' - 13744', 13747' - 13766', 13769' - 13778', 13780' - 13785', 13795' - 13824', 13827' - 13846' true vertical subsea 8852' - 8938' (six intervals) Tubing (size, grade, and measured depth)3-1/2", 9.2#, L-80 TDS to 13215' ..._. IP. LIL:AI b .~.~.~ Packers and SSSV (type and measured depth) 9-5/8" Otis HCM packer at 13136'; Otis SSSV Landing Nipple at 2278' 13. Attachments [~ Description summary of proposal i--] Detailed operations program [--~ BOP sketch 14. Estimated date for commencing operation September 15, 1998 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: W.B. Lloyd, 564-4016 Date approved I15. Status of well classifications as: [] Oil [--I Gas i--I Suspended Service Prepared By Name/Number: Terrie Hubble, 564~4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone Title Engineering Supervisor Commission Use Only Date witness Conditions of Approval: Notify Commissi~n_tati.ve m~_~_._~. Plu~ BO~ '"Location clearance Approved by order of the Commission .... _----..:, -~ -, Commissioner Form 10-403 Rev. 06/15/88 ~ I Approval No.j~,~:~-~ ¢ D ate ~/~,//2~ Submit In Triplicate H141165 DATE 08/03/~8 CHECK NO. DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET CKO731~SD , 0731~8 I00. O0 100. O0 HANDLING [NST' S/H TERRIE HUBBLE X4~8 rilE ATTACHED CHECK IS IN PAYMENT FOR rtE=MR nl=~_?;n=n Aa _ _ · WELL PERMIT CHECKLIST COMPANY ~,~ WELL NAME ~/~ ~) -,/2_~ FIELD & POOL ADMINISTRATION ~ ~/__(::~_,~'_5'O INIT CLASS _,~_~..v_.,~. .,/-,~-,"'J GEOL 1. Permit fee attached ....................... N AREA ~".~' ,c3 PROGRAM: exp [] dev.,~redrll~serv [] wellbore seg II ann. disposal para req II 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING __DATE .... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CM'r will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved. 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to .,5'(~o(~ .psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. UNIT# /"/'~'_~'~ ON/OFF SHORE _~-'Zxt~ ....... N GEOLOGY APPR DATE 31.30' Data Permit presented can be issued on potentialW/° hydrogen overpressure sulfidezones measures ....... ..... ~ YvY ~" ~ ~ _~._~_ Y ............ .............................................................................................................................................................................. 32. Seismic analysis of shallow gas zones. ' 33. Seabed condition survey (if off-shore) ............. 34. Contact name/phone_for weekly progress reports . . . . ..,..~'". Y N [exploratory only] ~ With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a pool; and (,E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N G_E__O_~: ENGINEERING: Ul~n~ular COMMISSION' ~PP~_~- BEW (~.~O.~r,.~' W~,"~ RNcDWJ ~- JDH co Comments/Instructions: M:choklisl u:v 05/29/9B dlf'C \rns~flfml~\w(~rdiat~\rflar~a\~:l~n~ tdr,t Well History File APPENDIX Information of detailed nature that is not particulady germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : B.P. EXPLORATION WELL NAME : W-12A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22023-01 REFERENCE NO : 99094 RECEIVED Alaska Oil l Gas Cons. C~~ * ALASKA COMPUTING CENTER * . ............................ . ....... SCHLUMBERGER ....... . . ............................ . COMPANY NAME : B.P. EXPLORATION WELL NAME : W- 12A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22023-01 REFERENCE NO : 99094 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAR-i-5~g 15:02 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE · 99/03/16 ORIGIN : FLIC REEL NAME · 99094 CONTINUATION # : PREVIOUS REEL : COFk4ENT : BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE · 99/03/16 ORIGIN : FLIC TAPE NAME : 99094 CONTINUATION # : 1 PREVIOUS TAPE : CO~g4ENT : BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 TAPE HEADER PRUDHOE BAY MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING W-12A 500292202301 B.P. EXPLORATION SCHLUMBERGER WELL SERVICES 16-MAR-99 BIT RUN 1 99094 BARNEY REID BIT RUN 2 BIT RUN 3 21 liN 12E 83.67 82.17 53.17 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 13577.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAR-i~-9J 15: 02 3RD STRING PRODUCTION STRING REMARKS: Well drilled 08-OCT through lO-NOV-98 with GR (CDR) j and IMPULSE. Data was collected in seven bit runs. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 1 EDITED MERGEDMWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: O. 5000 FILE SUN~ff4RY LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 12870.0 20905.0 BASELINE DEPTH 88888.0 20629.0 20601.0 20571.5 20541.0 20517.0 20494.0 20482.5 20471.0 20444.0 20419.0 20386.5 20372.0 20348.0 20326.0 20321.5 20304.5 20293.5 20290.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... 88905.0 20646.0 20619.5 20588.0 20557.5 20532.5 20509.0 20498.5 20485.5 20458.5 20433.5 20403.0 20387.5 20365.0 20342.5 20334.5 20320.5 20314.0 20309.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20258 5 20251 5 20233 5 20212 0 20165 0 20131 0 20088 5 20076 0 20053 0 20034.5 20030.0 20015.5 19985.0 19960.5 19954.0 19909.5 19878.5 19867.0 19850.5 19843.5 19839.5 19801.0 19667.0 19633.0 19616.5 19595.0 19571.5 19556.5 19516.5 19512.5 19497.0 19485.5 19453.5 19431.5 19424.0 19413.5 19387.5 19383.0 19369.0 19325.0 19311.0 19293.5 19270.0 19266.5 19232.5 19214.0 19210 0 19171 5 19152 5 19048 5 18955 0 18944 5 18931 0 18893 0 18881 0 20277.0 20270.0 20251.5 20228.5 20182.0 20149.5 20105.5 20093.0 20065.0 20051.5 20046.0 20031.5 20001.0 19976.5 19971.0 19925.0 19894.5 19882.5 19867.0 19860.5 19856.0 19818.0 19682.5 19646.5 19631.5 19610.5 19586.5 19571.5 19532.0 19529.0 19511.5 19500.0 19467.0 19441.5 19434.0 19426.5 19401.0 19397.0 19381.5 19337.0 19323.0 19303.5 19284.0 19279.5 19246.5 19229.0 19225.0 19186.0 19166.0 19066.5 18969.0 18959.0 18944.5 18907.0 18894.0 16-MAR-i'9~9J 15:02 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 18877 0 18827 5 18798 5 18771 5 18725 5 18717 5 18688 0 18659 0 18647 5 18630 5 18592 0 18539 5 18534.0 18460.5 18449.0 18423.5 18404.0 18399.5 18344.5 18327.5 18280.0 18256.0 18240.5 18198.0 18168.5 18120.0 18067.5 18017.5 17992.0 17975.5 17971.0 17967.5 17966.0 17932.0 17874.0 17856.5 17823.5 17810.5 17774.5 17766.0 17726.5 17703 5 17693 5 17666 0 17643 5 17600 5 17558 0 17539 5 17526 0 17519 0 17497 5 17465 5 17456 5 17398.0 17374.0 18891.0 18841.5 18812.0 18785.0 18739.5 18727 0 18701 5 18672 5 18658 5 18644 0 18605 5 18553 5 18546.5 18472.5 18460.5 18435.5 18412.0 18405.5 18357.0 18341.5 18292.5 18267.0 18255.0 18211.5 18182.5 18134.0 18079.0 18028.5 18003.5 17986.0 17982.0 17979.5 17976.0 17945.5 17884.5 17857.5 17835.0 17819.0 17782.5 17773.5 17735.5 17713.0 17704.5 17674 0 17651 5 17600 5 17559 0 17541 5 17529 5 17521 5 17506 5 17474 0 17467 5 17409.0 17384.5 16-MAR-19m~J 15: 02 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 17344.5 17316.0 17306.0 17301.0 17032.0 17006.0 17000.0 16961 5 16952 5 16906 5 16893 5 16888 5 16854 0 16798 5 16746 5 16723 5 16712 5 16696.5 16691.5 16676.5 16659.0 16641.0 16636.0 16607.0 16578.0 16468.0 16423.0 16411.5 16385.0 16341.0 16331.5 16324.5 16316.0 16306.0 16299.0 16278.5 16269.0 16251.0 16247.5 16216.5 16199.0 16191.0 16175.5 16140.5 16119.0 16112.0 16105.0 16093.5 16079.5 16031.0 15990.5 15953.5 15929.5 15906.0 15895.0 17357.0 17327.0 17314.5 17304.5 17039.5 17011.5 17009.5 16974.0 16963.0 16914.5 16903.5 16898.5 16861.5 16808.5 16753 0 16740 5 16724 5 16703 5 16698 5 16681 0 16664 0 16651 5 16647 5 16614 5 16588.0 16476.5 16431.5 16420.0 16396.0 16357.5 16346.5 16338.0 16330.5 16320.0 16313.5 16291.5 16283.0 16264.0 16261.5 16227.5 16207.5 16200.0 16184.5 16150.0 16128.0 16119.0 16113.5 16103.5 16089.0 16038.5 15999.0 15964.0 15938.5 15917.5 15906.0 16-MAR-19~I~ 15: 02 PAGE LIS Tape Verification Listing Schlumberger Alaska Computing Center 15854 5 15833 0 15828 0 15815 0 15769 5 15737 5 15719 5 15680 0 15666.5 15659.0 15653.5 15627.5 15605.5 15575.5 15523.0 15520.5 15512.0 15488.0 15446.0 15434.5 15427.5 15420.0 15416.0 15370.5 15362.0 15353.0 15329.5 15312.0 15295.5 15265.0 15248.5 15227.5 15206.5 15175.0 15155.0 15151.0 15131.0 14916.0 14900.5 14891.5 14877.5 14844.5 14839.0 14830.5 14778.5 14712.0 14689.0 14577 5 14541 0 14485 5 14471 5 14454 5 14430 0 14414 0 14403 0 15865.5 15843.5 15839.0 15828.5 15783.0 15751.5 15734.5 15695.0 15683.0 15676.0 15667 5 15642 0 15614 5 15584 0 15531 0 15527 5 15518 0 15494 0 15451 0 15440 5 15432.5 15426.0 15421.5 15375.0 15367.5 15360.0 15338.5 15318.5 15303.5 15273.5 15256.5 15235.5 15215.5 15183.0 15163.5 15160.0 15140.5 14919.0 14902.0 14892.5 14878.0 14848.0 14842.5 14831.5 14784.5 14717.5 14693.5 14582.5 14546.0 14491.0 14474.0 14459.0 14435.0 14419.5 14406.0 16-MAR-l~5~15 : 02 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 14372.5 14351.0 14336.0 14321.0 14313.5 14280.0 14273.5 14236.5 14234.0 14228.5 14222.5 14215.5 14195.5 14158.0 14131.0 14116.5 14089.5 14055.5 13998.5 13991.5 13970.5 13946.0 13934.5 13920.0 13909.5 13883.5 13861.0 13845.5 13843.5 13839.0 13825.5 13814.0 13788.0 13774.0 13758.0 13748.5 13743.0 13735.5 13721.5 13719.0 13716.0 13694.5 13673.0 13658.0 13642.5 13627.5 13620.0 13613.0 13602.0 13589.0 13571.0 13547.5 13540.5 13350.5 13318.5 14373.0 14355.5 14340.0 14326.0 14318.5 14285.0 14278.0 14241.5 14236.0 14229.5 14225.5 14218.5 14199.5 14162.0 14135.5 14123.0 14096.5 14060 5 14004 5 13998 5 13977 5 13950 5 13940 0 13926.5 13916.0 13890.5 13868.0 13852.0 13848.5 13843.0 13829.5 13819.5 13794.0 13780.0 13762.5 13753.0 13747.5 13739.0 13725.5 13724.0 13720.0 13698.5 13675.0 13661.5 13645.5 13631.5 13624.0 13617.5 13606.5 13592.0 13573.5 13551.5 13545.5 13353.0 13322.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAR-i~9~ 15: 02 PAGE: 13302.0 13297.5 13286.5 13278.0 13170.0 13031.5 13019.0 12991.5 12958.0 12948.0 12943.0 12939.5 12920.0 12902.5 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: 13307.5 13300 5 13290 0 13280 5 13174 0 13038 0 13023 5 12994.5 12955.5 12948.0 12941.5 12939.0 12923.0 12905.0 102.5 BIT RUN NO. MERGE TOP MERGE BASE 1 12870.0 16634.0 2 13525.0 18035.0 3 14135.0 15122.0 4 15083.0 15304.0 5 15256.0 16682.0 6 16634.0 18083.0 7 18035.0 20905.0 The depth adjustments shown above reflect the MWD GR to the USIT GR logged by SWS. Ail other MWD curves were carried with the GR. The GR's from the CDR (run 1) and the IMPULSE (runs 2-7) were merged into one for this file. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET. TYPE ~ 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAR-19~J15 : 02 PAGE: TYPE REPR CODE VALUE 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD OH~4~ 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD OHI~I 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD OH~ 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD 0b94~4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD OH~4 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RAD MWD OPiM~4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RAM MWD OH~4~ 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 RAS MWD OHI~I 4000290 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 12870.000 FET.MWD -999.250 ROP.MWD 110.430 GR.MWD RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD -999.250 RPX.MWD RPXX.MWD -999.250 RAD.MWD -999.250 RAM. MWD -999.250 RAS.MWD DEPT. 13000.000 FET.MWD -999.250 ROP.MWD 37.500 GR.MWD RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD -999.250 RPX.MWD RPXX.MWD -999.250 RAD.MWD -999.250 RAM. MWD -999.250 RAS.MWD DEPT. 14000.000 FET.MWD 1.116 ROP.MWD 45.920 GR.MWD RPD.MWD 13.750 RPM. MWD 13.820 RPS.MWD 13.720 RPX.MWD RPXX.MWD 12.670 RAD.MWD 11.770 RAM. MWD 11.730 RAS.MWD DEPT. 15000.000 FET.MWD 3.437 ROP.MWD 20.980 GR.MWD RPD.MWD 11.400 RPM. MWD 11.440 RPS.~WD 11.470 RPX.MWD RPXX.MWD 12.350 RAD.MWD 8.310 RAM.MWD 8.690 RAS.MWD DEPT. 16000. 000 FET.MWD 1. 411 ROP.MWD 105. 870 GR.MWD RPD.MWD 9. 560 RPM.MWD 9. 150 RPS.MWD 8. 370 RPX.MWD RPXX.MWD 5. 950 RAD.MWD 9. 720 RAM.MWD 9. 720 RAS.MWD -999.250 -999.250 -999.250 102.910 -999.250 -999.250 27.450 13.310 11.580 58.340 11.700 8.920 21.670 7.190 9.440 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAR-19>%' 15: 02 PAGE: 10 DEPT. 17000. 000 FET.MWD RPD. MWD 12.310 RPM. MWD RPXX . MWD 5. 820 RAD . MWD DEPT. 18000.000 FET.MWD RPD.MWD 6.020 RPM. M WD RPXX.MWD 5.860 RAD.MWD DEPT. 19000.000 FET.MWD RPD.MWD 11.220 RPM. MWD RPXX.MWD 12.280 RAD.MWD DEPT. 20000.000 FET. MWD RPD.MWD 9.170 RPM. MWD RPXX.MWD 4.420 RAD.MWD 2.277 ROP.MWD 10. 780 RPS.MWD 14. 750 tLAM. MWD 1.788 ROP.I~WD 5.990 RPS.~4~WD 6.100 RAi~.~ 1.610 ROP. MWD 11.120 RPS.MWD 8.290 RAM. ~fWD 2. 304 ROP.MWD 7. 670 RPS.MWD 9. 360 RAM. MWD 58.830 9.300 14.940 61.220 5. 930 6.270 30.100 11.280 8.730 42.860 6.470 9.330 GR.MWD RPX.MWD RAS.MWD GR. MWD RPX.MWD RAS.MWD GR. MWD RPX.MWD RAS. MWD GR.MWD RPX.MWD RAS.MWD DEPT. 20905.000 FET.MWD -999.250 ROP.MWD 11.980 GR.MWD RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD -999.250 RPX.MWD RPXI~.MWD -999.250 RAD.MWD -999.250 ~.MWD -999.250 RAS.MWD 24.520 7.580 14.400 21.020 5.880 6.160 52. 410 11. 710 8. 920 47.450 5.420 8.900 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE · 99/03/16 M_AXREC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ~BER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE 11 FILE SUNfl~Y VENDOR TOOL CODE START DEPTH MWD 12870.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13579.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAI~MA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: lO-NOV-98 5.1.12 5.0.53 MEMORY 20888.0 13870.0 20888.0 60 54.7 62.2 TOOL NUMBER CDR 7045 6.000 13577.0 BRINE 8.70 34.0 CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE MEMORY, V5. OC SOFTWARE $ O. 279 70.0 0.248 70.0 0.298 70.0 LIS T~e Verification Listing Schlumberger Alaska Computing Center 16-MAR-i~-J9 -~15 : 02 PAGE: 12 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 4000290 O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 LW1 F/HR 4000290 O0 000 O0 0 2 1 1 4 68 0000000000 * * DA TA * * DEPT. 12814. 500 GR. LWl 87. 056 ROP5. LW1 60. 200 DEPT. 13000. 000 GR.LW1 110.542 ROPS.LW1 34.549 DEPT. 13579.000 GR.LW1 195.689 ROPS.LW1 10.245 ** END OF DATA ** LIS ~&~e Verification Listing Schlumberger Alaska Computing Center 16-MAR-'~jg-i5: 02 PAGE: 13 **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LOG HEADER DATA FILE HEADER FILE~BER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUA94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 13525,0 14192.0 DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) .. HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ lO-NOV-98 5.1.12 5.0.53 ~I~MOR Y 20888.0 13870.0 20888.0 40 62.2 83.5 TOOL NUMBER IMP 002 LIS ~-ap~ Verification Listing Schlumberger Alaska Computing Center 16-MAR-~99'15: 02 PAGE: 14 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 6.000 13577.0 BOREHOLE CONDITIONS MUD TYPE: BRINE MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S) : 34.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OB?4M) AT TEMPERATURE (DEGF) '. MUD AT MEASURED TEMPERATURE (MT): 0.279 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 0.248 MUD CAKE AT (MT): O. 298 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REM~ARKS: CDR RUN FOR GR ON RUN#1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE MEMORY, VS. OC SOFTWARE $ LIS FORMAT DATA 70.0 70.0 70.0 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 LIS ~J-p~e Verification Listing Schlumberger Alaska Computing Center PAGE: 15 TYPE REPR CODE VALUE 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE C~SS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 3 1 1 4 68 0000000000 ROP$ LW2 F/HR 4000290 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 4000290 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 S 4000290 O0 000 O0 0 3 1 1 4 68 0000000000 A22H LW2 OHMM4000290 O0 000 O0 0 3 1 1 4 68 0000000000 A28H LW2 0HB~I4000290 O0 000 O0 0 3 1 1 4 68 0000000000 A34H LW2 OH~ff44000290 O0 000 O0 0 3 1 1 4 68 0000000000 PiOH LW2 0HN~44000290 O0 000 O0 0 3 1 1 4 68 0000000000 P16H LW2 0tflv~44000290 O0 000 O0 0 3 1 1 4 68 0000000000 P22H LW2 0tiNk44000290 O0 000 O0 0 3 1 1 4 68 0000000000 P28H LW2 OH~ff44000290 O0 000 O0 0 3 1 1 4 68 0000000000 P34H LW2 OH~ff44000290 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 13528.500 ROPS.LW2 -999.250 GR.LW2 73.944 TABR.LW2 A22H.LW2 300. 000 A28H. LW2 300. 000 A34H. LW2 300. 000 PIOH.LW2 P16H.LW2 0.149 P22H. LW2 0.210 P28H. LW2 0.258 P34H.LW2 DEPT. 14000. 000 ROPS.LW2 53. 411 GR.LW2 29. 666 TABR.LW2 A22H. LW2 8.734 A28H. LW2 9. 061 A34H. LW2 9. 323 P1 OH. LW2 P16H.LW2 8. 650 P22H. LW2 8. 735 P28H.LW2 8. 817 P34H. LW2 DEPT. 14192.500 ROPS.LW2 36.667 GR.LW2 38.522 TABR.LW2 A22H.LW2 7.012 A28H.LW2 7.235 A34H.LW2 7.340 PiOH. LW2 P16H.LW2 6. 300 P22H.LW2 6. 639 P28H.LW2 6. 786 P34H. LW2 -0. 016 0.142 0.190 4529.984 8.326 9.067 7039.984 5.851 6.816 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS ~a~e Verification Listing Schlumberger Alaska Computing Center 16-MAR-i~9 15: 02 PAGE: 16 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION : O01CO1 DATE : 99/03/16 ~ REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NTgMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN ~BER: 3 DEPTH INCREMENT: O. 5000 FILE SUM~3A~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 14135.0 15122.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMIIM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MIID TYPE: MUD DENSITY (LB/G) MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) lO-NOV-98 5.1.12 5.0.53 M]~M O R Y 20888.0 13870.0 20888.0 40 83.4 86.5 TOOL ~BER ........... IMP 066 6. 000 13577.0 BRI1FE 8.70 34.0 LIS ~p~ Verification Listing Schlumberger Alaska Computing Center PAGE: 17 FLUID LOSS (C3): RESISTIVITY (OH~4) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): O. 279 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): O. 248 MUD CAKE AT (MT): O. 298 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE ~ORY, V5. OC SOFTWARE $ LIS FORMAT DATA 70.0 70.0 70.0 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS T~pe Verification Listing Schlumberger Alaska Computing Center PAGE: 18 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 ROP5 LW3 F/HR 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 TABR LW3 S 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 A22H LW3 OH~ 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 A28H LW3 OPi~f4000290 O0 000 O0 0 4 1 1 4 68 0000000000 A34H LW3 0ttMM4000290 O0 000 O0 0 4 1 1 4 68 0000000000 PIOH LW3 OPffc~f4000290 O0 000 O0 0 4 1 1 4 68 0000000000 P16H LW3 OH~M 4000290 O0 000 O0 0 4 1 1 4 68 0000000000 P22H LW3 0HN~44000290 O0 000 O0 0 4 1 1 4 68 0000000000 P28H LW3 0tk4~4000290 O0 000 O0 0 4 1 1 4 68 0000000000 P34H LW3 OH~k44000290 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 14061.500 ROPS.LW3 8245.803 GR.LW3 29.339 TABR.LW3 A22H. LW3 9. 126 A28H. LW3 9. 712 A34H. LW3 9. 952 Pl OH. LW3 P16H. LW3 8. 779 P22H.LW3 9. 844 P28H. LW3 10. 424 P34H. LW3 DEPT. 15000. 000 ROPS. LW3 18. 405 GR. LW3 58. 940 TABR. LW3 A22H.LW3 8.248 A28H. LW3 8.110 A34H.LW3 7.832 PIOH. LW3 P16H.LW3 11.376 P22H.LW3 11.781 P28H.LW3 12.122 P34H. LW3 DEPT. 15122.000 ROPS.LW3 12.295 GR.LW3 61.597 TABR.LW3 A22H. LW3 9.362 A28H. LW3 9.210 A34H.LW3 8.847 PiOH.LW3 P16H. LW3 9. 412 P22H. LW3 9. 795 P28H. LW3 10. 053 P34H. LW3 0.000 7.663 10.524 10794.000 10.970 12.333 10388. 000 8. 887 10. 253 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS ~-p~ Verification Listing Schlumberger Alaska Computing Center 16-MAR-1999 15:02 PAGE: 19 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION . O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SLff~IARY VENDOR TOOL CODE START DEPTH STOP DEPTH 15083.0 15304.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 10 -NOV- 98 5.1.12 5.0.53 MEMORY 20888.0 13870.0 20888.0 40 77.2 86.5 TOOL NUMBER IMP 066 6.000 13577.0 BRINE 8.70 34.0 LIS ~a~-~ Verification Listing Schlumberger Alaska Computing Center PAGE: 20 FLUID LOSS (C3): RESISTIVITY (Oh?4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.279 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 0.248 MUD CAKE AT (MT): O. 298 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REblARKS: CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE MEMORY, VS. OC SOFTWARE $ LIS FORMAT DATA 70.0 70.0 70.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS G~pe Verification Listing Schlumberger Alaska Computing Center 16-MAR-i'~3 15:02 PAGE: 21 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 ROP5 LW4 F/HR 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 TABR LW4 S 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 A22H LW4 OPIUM 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 A28H LW4 0H~94 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 A34H LW4 OHNk~4000290 O0 000 O0 0 5 1 1 4 68 0000000000 PiOH LW4 0H~4000290 O0 000 O0 0 5 1 1 4 68 0000000000 P16H LW4 OH~4M4000290 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 OH~4M4000290 O0 000 O0 0 5 1 1 4 68 0000000000 P28H LW4 OPi~ff4 4000290 O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 0H~4~4000290 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 15043 . 000 ROP5. LW4 -999. 250 GR. LW4 69. 538 TABR. LW4 A22H.LW4 1 . 713 A28H. LW4 300. 000 A34H. LW4 300. 000 PiOH.LW4 P16H. LW4 0.144 P22H.LW4 0.703 P28H.LW4 1000.000 P34H.LW4 DEPT. 15304. 000 ROPS. LW4 75. 946 GR. LW4 26. 289 TABR. LW4 A22H. LW4 5. 652 A28H. LW4 5. 674 A34H. LW4 5. 583 P1 OH. LW4 P16H. LW4 5.539 P22H. LW4 5. 689 P28H. LW4 5. 725 P34H. LW4 0.000 0.138 1000.000 3402.000 5.237 5.771 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS T~p~ Verification Listing Schlumberger Alaska Computing Center PAGE: 22 FILE HEADER FILE ~BER 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN ~BER: 5 DEPTH INCREMENT: O. 5000 FILE SUNk4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH NT~D 15256.0 16682.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIML~4 ANGLE '. MAXI~ ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MIID TYPE: MUD DENSITY (LB/G): MLrD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OIff4~l) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): lO-NOV-98 5.1.12 5.0.53 M~ORY 20888.0 13870.0 20888.0 60 77.2 97.6 TOOL NLCqBER ........... IMP 066 6.000 13577.0 BRINE 8.70 34.0 0.279 70.0 0.248 70.0 0.298 70.0 LIS T~e Verification Listing Schlumberger Alaska Computing Center PAGE: 23 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE MEMORY, V5. OC SOFTWARE $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 ROP5 LW5 F/HR 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 GR LW5 GAPI 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 TABR LW5 S 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 A22H LW5 OttM~ 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 A28H LW5 0H~4000290 O0 000 O0 0 6 1 1 4 68 0000000000 A34H LW5 0H~4~4000290 O0 000 O0 0 6 1 1 4 68 0000000000 PiOH LW5 OH~IM4000290 O0 000 O0 0 6 1 1 4 68 0000000000 P16H LW5 OPi~ff~4000290 O0 000 O0 0 6 1 1 4 68 0000000000 P22H LW5 OHMM 4000290 O0 000 O0 0 6 1 1 4 68 0000000000 P28H LW5 OH~ff44000290 O0 000 O0 0 6 1 1 4 68 0000000000 P34H LW5 OH~k~4000290 O0 000 O0 0 6 1 1 4 68 0000000000 LIS ~ap~' Verification Listing Schlumberger Alaska Computing Center PAGE: 24 ** DATA ** DEPT. 15233. 000 ROP5. LW5 -999. 250 GR. LW5 39. 806 TABR. LW5 A22H.LW5 5. 715 A28H. LW5 5. 934 A34H. LW5 6. 069 PiOH.LW5 P16H. LW5 4.003 P22H.LW5 4.578 P28H. LW5 4.955 P34H. LW5 DEPT. 16000.000 ROP5.LW5 136.384 GR.LW5 23.441 TABR.LW5 A22H. LW5 8.881 A28H. LW5 9.125 A34H.LW5 9.208 PiOH.LW5 P16H.LW5 6.859 P22H. LW5 7.891 P28H.LW5 8.640 P34H.LW5 DEPT. 16682. 000 ROPS.LW5 8. 310 GR.LW5 97. 650 TABR.LW5 A22H. LW5 11.566 A28H.LW5 11.416 A34H.LW5 11.251 PIOH. LW5 P16H.LW5 12.461 P22H.LW5 13.329 P28H.LW5 13.804 P34H. LW5 0.000 3.367 5.229 4549.984 5.704 9.229 22818.063 11.280 14.061 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION : O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: O. 5000 FILE SU~94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH ~ 16634.0 18083.0 LIS T~e Verification Listing Schlumberger Alaska Computing Center PAGE .. 25 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE '. MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) '. EWR FREQUENCY (HZ): 10 -NOV- 98 5.1.12 5.0.53 MEMORY 20888.0 13870.0 20888.0 60 91.4 97.6 TOOL NUMBER IMP 066 6.000 13577.0 BRINE 8.70 34.0 O. 279 70.0 0.248 70.0 0.298 70.0 REMARKS: CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWN-HOLE MEMORY, VS. OC SOFTWARE $ LIS FORMAT DATA 20000 LIS T~' Verification Listing Schlumberger Alaska Computing Center 15:02 PAGE: 26 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 7 1 1 4 68 0000000000 DEPT FT 4000290 ROP5 LW6 F/HR 4000290 O0 000 O0 0 7 1 1 4 68 0000000000 GR LW6 GAPI 4000290 O0 000 O0 0 7 i 1 4 68 0000000000 TABR LW6 S 4000290 O0 000 O0 0 7 i 1 4 68 0000000000 A22H LW6 OH~4M 4000290 O0 000 O0 0 7 1 1 4 68 0000000000 A28H LW6 OH~4M4000290 O0 000 O0 0 7 1 1 4 68 0000000000 A34H LW6 OIfl~4 4000290 O0 000 O0 0 7 1 1 4 68 0000000000 PIOH LW6 OHI~M 4000290 O0 000 O0 0 7 1 1 4 68 0000000000 P16H LW6 0H~4000290 O0 000 O0 0 7 1 1 4 68 0000000000 P22H LW6 OH~IM4000290 O0 000 O0 0 7 1 1 4 68 0000000000 P28H LW6 0H~4~4000290 O0 000 O0 0 7 1 1 4 68 0000000000 P34H LW6 OH~M4000290 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 16623.000 ROP5.LW6 -999.250 GR.LW6 97.637 TABR.LW6 A22H.LW6 11.711 A28H.LW6 11.674 A34H.LW6 11.281 PIOH.LW6 P16H.LW6 13.917 P22H. LW6 13.946 P28H.LW6 14.018 P34H.LW6 0.000 13.637 14.286 LIS ~p~ Verification Listing Schlumberger Alaska Computing Center 16-~-~'9 15:02 PAGE: 27 DEPT. 17000. 000 ROPS.LW6 A22H. LW6 14 . 52 6 A28H. LW6 P16H.LW6 10. 939 P22H. LW6 DEPT. 18000.000 ROPS.LW6 A22H.LW6 6.851 A28H. LW6 P16H.LW6 4.431 P22H. LW6 DEPT. 18082.500 ROPS.LW6 A22H.LW6 7.799 A28H. LW6 P16H.LW6 5.616 P22H.LW6 58.063 GR.LW6 14.946 A34H.LW6 11.912 P28H. LW6 63.160 GR.LW6 7.499 A34H. LW6 4.824 P28H.LW6 59.418 GR.LW6 8.011 A34H. LW6 6.316 P28H.LW6 79.248 TABR. LW6 14.610 P1 OH. LW6 12. 259 P34H. LW6 21.016 TABR.LW6 7.513 PiOH. LW6 5.186 P34H. LW6 19. 703 TABR. LW6 7. 844 PiOH.LW6 6. 762 P34H. LW6 9010.000 9.139 12.742 5051.906 4.116 5.412 3304.688 4.802 7.067 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · 001C01 DATE ' 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE · 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: O. 5000 FILE SUNkqARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 18035.0 20888.0 $ LOG HEADER DATA DATE LOGGED: 10 -NOV- 98 SOFTWARE: LIS T~e Verification Listing Schlumberger Alaska Computing Center PAGE: 28 SURFACE SOFTWARE VERSION: DOWArHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE IMP RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) 5.1.12 5.0.53 MEMORY 20888.0 13870.0 20888.0 60 81.08 91.4 TOOL NUMBER IMP 066 6.000 13577.0 BOREHOLE CONDITIONS MUD TYPE: BRINE MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S) : 34.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~4~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.279 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): O. 248 MUD CAKE AT (MT): O. 298 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) EWR FREQUENCY (HZ) 20000 RE~NL~S: CDR RUN FOR GR ON RUN #1 IMPULSE RUN ON RUNS 2-7 DATA FROM DOWNHOLE MEMORY, V5. OC SOFTWARE $ LIS FORMAT DATA 70.0 70.0 70.0 LIS T~' Verification Listing Schlumberger Alaska Computing Center · 16-MAR- I~ --15: 02 PAGE: 29 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 4000290 O0 000 O0 0 8 1 1 4 68 0000000000 ROP5 LW7 F/HR 4000290 O0 000 O0 0 8 1 1 4 68 0000000000 GR LW7 GAPI 4000290 O0 000 O0 0 8 1 1 4 68 0000000000 TABR LW7 S 4000290 O0 000 O0 0 8 1 1 4 68 0000000000 A22H LW7 0Hl~44000290 O0 000 O0 0 8 1 1 4 68 0000000000 A28H LW7 OH~R44000290 O0 000 O0 0 8 1 1 4 68 0000000000 A34H LW7 OPR~q4000290 O0 000 O0 0 8 1 1 4 68 0000000000 PiOH LW7 0H~244000290 O0 000 O0 0 8 1 1 4 68 0000000000 P16H LW7 0H~I4000290 O0 000 O0 0 8 1 1 4 68 0000000000 P22H LW7 OHFR44000290 O0 000 O0 0 8 1 1 4 68 0000000000 P28H LW7 OHI~2q4000290 O0 000 O0 0 8 1 1 4 68 0000000000 P34H LW7 0H~244000290 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 17944.500 ROPS.LW7 1559.766 GR.LW7 43.178 TABR.LW7 A22H.LW7 4.734 A28H.LW7 4.735 A34H.LW7 4.670 PIOH.LW7 P16H.LW7 5.481 P22H. LW7 5.649 P28H. LW7 5.863 P34H.LW7 DEPT. 18000.000 ROPS.LW7 2987.698 GR.LW7 20.926 TABR.LW7 A22H.LW7 6.723 A28H,LW7 6.887 A34H.LW7 6.880 PIOH.LW7 P16H.LW7 5.136 P22H, LW7 5.512 P28H.LW7 5.803 P34H. LW7 42.000 5.513 5.924 392.000 4.670 6.066 LIS T~p~ Verification Listing Schlumberger Alaska Computing Center 16-MAR- l g~ ~ ~15 : 02 PAGE: 30 DEPT. 19000. 000 ROPS. LW7 A22H. LW7 8. 600 A28H. LW7 P16H.LW7 9.485 P22H. LW7 DEPT. 20000.000 ROPS.LW7 A22H. LW7 12.317 A28H. LW7 P16H. LW7 8.709 P22H. LW7 DEPT. 20889.000 ROPS.LW7 A22H.LW7 2.265 A28H. LW7 P16H.LW7 2.332 P22H. LW7 37.497 GR.LW7 8.540 A34H.LW7 10.007 P28H.LW7 29.553 GR.LW7 12.579 A34H.LW7 10.233 P28H.LW7 10.798 GR.LW7 2.240 A34H. LW7 2.426 P28H. LW7 66.916 TABR . LW7 8.196 P1 OH. LW7 10. 314 P34H. LW7 98.322 TABR.LW7 12.081 PiOH. LW7 11.338 P34H.LW7 19.651 TABR.LW7 2.179 PIOH. LW7 2.450 P34H.LW7 6272. 000 8. 902 10.417 6909.906 7.113 12.159 8507.688 2.188 2.452 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/03/16 ORIGIN · FLIC TAPE NAME : 99094 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT · BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/03/16 ORIGIN : FLIC REEL NAME : 99094 CONTINUATION # : PREVIOUS REEL : COM~4ENT : BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 * ALASKA COMPUTING CENTER * ....... SCHLUlViBERGER ....... COMPANY NAME : BP EXPLORATION (ALASKA), INC. WELL NAME : W-12A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292202301 REFERENCE NO : 99122 LIS T-ap~ verification Listing Schlumberger Alaska Computing Center i O-MAR-lb~,m~ '~10 : 55 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/03/10 ORIGIN : FLIC REEL NAME : 99122 CONTINUATION # : PREVIOUS REEL : COMMENT : BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/03/10 ORIGIN · FLIC TAPE NAME : 99122 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT · BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: W- 12A API NUMBER: 500292202301 OPERATOR: BP EXPLORATION (ALASKA), INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 10 -MAR- 99 JOB NUMBER: 99122 LOGGING ENGINEER: MORRISON OPERATOR WITNESS: D REID SURFACE LOCATION SECTION: 21 TOWNSHIP: 1 iN RANGE: 12E FNL: FSL: 3738 FEL: 1196 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 83.67 DERRICK FLOOR: 82.17 GROUND LEVEL: 53.17 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 6. 000 4. 500 20888.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tap~ Verification Listing Schlumberger Alaska Computing Center lO-MAR-l~-_~?~"h0:55 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... CET ....... REMARKS: THIS TAPE CONTAINS THE LDWG FORMATTED CASED HOLE USIT/CBT GR DATA AQUIRED ON BP EXPLORATION'S W-12A WELL. THIS LOG IS THE PDC. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS ArUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SOW~L~RY LDWG TOOL CODE START DEPTH STOP DEPTH CET 20650.0 12650.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH ....... REMARKS: THID FILE CONTAINS THE EDITED CET DATA. THE DATA IS AQUIRED IN TWO SEPERATE FILES, SO IT IS SPLICED AT LIS Tap~~ Verification Listing Schlumberger Alaska Computing Center lO-MAR-l>~io:55 PAGE: 14900' IN THIS FILE. THE CURVES ARE CLIPPED AT FIRST AND LAST VALID READING. $ Lis FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 8 9 11 12 13 14 15 16 0 0.5 FT 85 65 68 65 66 68 66 0 65 FT 66 68 66 1 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1225292 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CET GAPI 1225292 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CET LB 1225292 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 20714.000 GRCH. CET -999.250 TENS. CET 4081.000 DEPT. 12650.000 GRCH. CET 77.283 TENS.CET -999.250 ** END OF DATA ** LIS TaPe'Verification Listing Schlumberger Alaska Computing Center I O-MAR-19~u~ i o :55 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE · 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUMFA&RY VENDOR TOOL CODE START DEPTH STOP DEPTH 20717.5 14886.5 USIT $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CBT CEMENT BOND US I T ULTRASOUND $ BOREHOLE AND CASING DATA 15-NOV-98 8Cl -205 20800.0 20718.0 12650.0 20714.0 TOOL NUMBER SGT-L CBT-EB USIT-A LIS T~p'e'~Verification Listing Schlumberger Alaska Computing Center lO-MAR-igor/lO:55 PAGE: OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 6.000 20888.0 5% KCL POLYMER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: Depth correlated to 03-May-90 SLB GR. Gemco's on CBT. USIT/CBT/GPIT/GR run in combo with TLC gear on Drillpipe. Cement: Type "G" plus: 35% S-8, 2% A-9, 0.9% BA-iO, 0.5% cd32, 0.3% FL-33, 0.2% A-2, 0.28% R-i, 1 ghsfp. Finished cement job at 22:00 11/11/98. Down log used for repeat. Tools came to surface covered in a pill~cement material. This, plus eccentralixation effects, could have caused poor bond repeat. THIS FILE CONTAINS THE RAW DATA FOR THE MAIN PASS, FIRST FILE. $ LIS FORMAT DATA LIS T~pe~ Verification Listing Schlumberger Alaska Computing Center lO-MAR-15~zlO:55 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1225292 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH LW1 GAPI 1225292 O0 000 O0 0 2 1 1 4 68 0000000000 TENS LW1 LB 1225292 O0 000 O0 0 2 1 1 4 68 0000000000 DT LW1 US/F 1225292 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 20717. 500 GRCH. LW1 17. 117 TENS.LW1 4374. 000 DT. LW1 DEPT. 14886. 500 GRCH. LW1 110. 176 TENS.LW1 1995. 000 DT.LW1 55.750 55.063 ** END OF DATA ** LIS Tap=~Verification Listing Schlumberger Alaska Computing Center iO-MAR-lg~-~ i0:55 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER 3 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUMbLARY VENDOR TOOL CODE START DEPTH STOP DEPTH 14958.5 12602.5 USIT $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAMMA RAY CBT CEMENT BOND USIT ULTRASOUND $ BOREHOLE AND CASING DATA 15-NOV-98 8C1-205 20800.0 20718.0 12650.0 20714.0 TOOL NUMBER SGT-L CBT-EB USIT-A LIS TaP~ Verification Listing Schlumberger Alaska Computing Center 10-MAR-19~-~10: 55 PAGE: OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 6.000 20888.0 5% KCL POLY~IER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZOlv-E TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: Depth correlated to 03-May-90 SLB GR. Gemco ' s on CBT. USIT/CBT/GPIT/GR run in combo with TLC gear on Drillpipe. Cement: Type "G" plus: 35% S-8, 2% A-9, 0.9% BA-IO, 0.5~ cd32, 0.3% FL-33, 0.2% A-2, 0.28% R-i, 1 ghsfp. Finished cement job at 22:00 11/11/98. Down log used for repeat. Tools came to surface covered in a pill~cement material. This, plus eccentralixation effects, could have caused poor bond repeat. THIS FILE CONTAINS THE RAW DATA FOR THE MAIN PASS, SECOND FILE. $ LIS FORMAT DATA LIS TaP=~"~erification Listing Schlumberger Alaska Computing Center 10 -MAR - 19~_-Jl 0: 55 PAGE: 9 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ATtTRZBNUMB SIZE REPR PROCESS ID ORDER # LOG TYPE C~SS MODNUM~ SAMP ELE~ CODE (HEX) DEPT FT 1225292 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH LW2 GAPI 1225292 O0 000 O0 0 3 1 1 4 68 0000000000 TENS LW2 LB 1225292 O0 000 O0 0 3 1 1 4 68 0000000000 DT LW2 US/F 1225292 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 14958. 500 GRCH. LW2 DEPT. 12602. 500 GRCH. LW2 173.730 TENS. LW2 1651.000 DT. LW2 71. 278 TENS. LW2 710. 000 DT. LW2 54.250 58.375 ** END OF DATA ** LIS Tap=-~'Verification Listing Schlumberger Alaska Computing Center 10 -MAR-19~ i 0: 55 PAGE: 10 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : * * * * TAPE TRAILER * * * * SERVICE NAME : EDIT DATE : 99/03/10 ORIGIN · FLIC TAPE NAME : 99122 CONTINUATION # : 1 PREVIOUS TAPE : COf~4ENT · BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/03/10 ORIGIN : FLIC REEL NAME : 99122 CONTINUATION # : PREVIOUS REEL : CO~94ENT · BP EXPLORATION, W-12A, PRUDHOE BAY, API #50-029-22023-01