Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-191 •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 20, 2012 5 " ) 0 0
Mr. Jim Reg g
Alaska Oil and Gas Conservation Commission \O\C6'
333 West 7 Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of West Beach
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from West
Beach that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
q i
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
West Beach
Date: 4/26/12
Corrosion
Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/
Well Name PTD # API # cement pumped cement off date inhibitor sealant date
ft bbls ft na gal
WB-03 2021450 50029223220000 Dust Cover NA 0.0 NA NA 4/22/2012
I .... WB-04 1901680 50029221170000 1.0 NA 1.0 NA 8.50 4/26/2012
WB-058 1981910 50029228170200 1.3 NA 1.3 NA 10.20 4/26/2012
WB-06 1982210 50029229290000 1.7 NA 1.7 NA 12.75 4/23/2012
WB-07 1991060 50029229490000 Dust Cover NA NA NA NA 4/25/2012
WBST -03 1760340 50029202080000 Suspended NA NA NA NA NA
WB-04 (PTD#1901680) & WB~(PTD#1981910) Approval to flow w/~SSSV Page 1 of 3
~ GUP~ -c~~
Regg, James B (DOA)
From: Grimaldi, Louis R (DOA)
Sent: Wednesday, July 29, 2009 7:59 PM t`C~(~ 7(~~~~ 1
To: Regg, James B (DOA) ~
Subject: RE: WB-04 (PTD#1901680) WB-05 (PTD#1981910 Approval to flow w/o a SSSV
Jim, /
Friday, July 24 2009; Aaron and I stopped by West beach pad and spoke with ASRC well tester Robert Fischer
who was man-watching some equipment (heater/treaters) for their well tests on WB#4. I questioned his ability and ~
authourity to shut-in the wells in question which confidently answered in the affirmative.
If you need a report on this please let me know.
Lou
From: Regg, James B (DOA)
Sent: Tue 7/21/2009 11:39 AM
To: Grimaldi, Louis R (DOA)
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
If you'r bored and need something to do, check out these wells and make sure there is a 24 hour man watch as
agreed
Jim Regg
AOGCC
Anc orageAAK 99501 ite 100 ~'+; ~. ~~~~ ~~ ~~_' ° r f~~~,~
907-793-1236 G= ~`''~"'~
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com]
Sent: Friday, July 17, 2009 10:41 AM
To: Maunder, Thomas E(DOA); Regg, ]ames B(DOA); Schwartz, Guy L(DOA)
Cc: NSU, ADW Well Integrity Engineer; Chmielowski, Jessie
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Tom,
As noted below, the AOGCC SSV test on WB-05 passed on 07/17/09. As requested, a 24 hour man-watch will
be carried out while the well is on production.
Torin
From: Yeager, Kevin E
Sent: Friday, July 17, 2009 9:42 AM
To: Chmielowski, Jessie; NSU, ADW Well Integrity Engineer
Cc: NSU, ADW Well Operations Supervisor; GPB, LPC Ops Lead
Subject: RE: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Torin,
7/30/2009
WB-04 (PTD#1901680) & WB~(PTD#1981910) Approval to flow w/~SSSV Page 2 of 3
Per note below, the SSV was tested on WB-05 this morning and passed. The test was witnessed by Mr.. Chuck
Schieve ( AOGCC Field Inspector) the DSO and myself.
Kevin.
From: Chmielowski, Jessie
Sent: Thursday, July 09, 2009 10:49 AM
To: Yeager, Kevin E; NSU, ADW Wells CT Scheduler
Cc: Warner, Ross L
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Kevin,
Please see note below from Tom Maunder.
Note regarding SL drift on WB-05B:
6/12/09 - SL drifted with 2.50" centralizer to 13862' SLM; stopped due to deviation; recovered 1/2 cup of frac
sand.
Jessie
From: NSU, ADW Well Integrity Engineer
Sent: Tuesday, July 07, 2009 9:53 AM
To: Chmielowski, Jessie; NSU, ADW Wells CT Scheduler; GPB, LPC DS Ops Lead
Cc: NSU, ADW Well Operations Supervisor; Warner, Ross L; GPB, GPMA OTL; NSU, ADW Well Support Supervisor
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
All,
We have approval from the AOGCC to POP, SSV test, and produce WB-05 without a SSSV. Please send us
results of the SSV test which needs to be conducted within 48 hours of being pop'd. We'll keep the AOGCC
informed of the progress.
Thank you,
Anna Dube
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Tuesday, July 07, 2009 8:13 AM
To: NSU, ADW Well Integrity Engineer; Regg, James B(DOA); Schwartz, Guy L(DOA)
Subject: RE: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Anna,
As noted, this is similar to P1-24. Your request to bring WB-05 on line as described in the July email messge
(below) is approved. Contact the AOGCC North Slope Inspector for opportunity to witness the SSV test, which
will be done within 48 hours of restarting production. A failing SSV test will require the well to be immediately shut
in.
Tom Maunder, PE
AOGCC
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com]
Sent: Monday, July 06, 2009 4:53 PM
To: Regg, ]ames B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA)
Cc: NSU, ADW Well Integrity Engineer
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
7/30/2009
WB-04 (PTD#1901680) & WB~(PTD#1981910) Approval to flow w1~SSSV Page 3 of 3
Hi Jim and Tom,
With your approval, we are ready to place WB-05 (PTD #1981910) on production without a SSSV to test the well.
To ciarify the e-mail below, both WB-04 and WB-05 will be placed on production but only WB-05 will be produced
without a SSSV. Similar to P1-24, WB-05 will have 24-hour manwatch and continuous methanol injection to
obtain an AOGCC witnessed SSV and then produce with well for 1-2 months with 24-hour manwatch. The last
SSV test was conducted and passed on 08/30/05. The well has not been online since this time except to for a
short production test late Novemember 2008.
Please call with any questions or send your approval at your earliest convenence.
Thank you,
Anna ~Du6e, ~P.~.
Well Integrity Coordinatar
GPB Wells Group
Phane: (907) 659-5102
Pager: (9a7) 659-51A0 x1154
From: NSU, ADW Well Integrity Engineer
Sent: Thu 6/25/2009 2:12 PM
To: 'Regg, James B(DOA)'; 'Maunder, Thomas E(DOA)'
Subject: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Jim/Tom,
WB-04 (PTD#1901680) & WB-OS (PTD#1981910) are both natural producers that present similar
hydrate problems to that of P 1-24. Recently, the AOGCC granted approval to flow P 1-24 without a
SSSV contingent upon a passing SSV test within 48 hours of initial production. We are requesting
approval to place wells WB-04 & WB-OS on production with a 24-hour manwatch and continuous
methanol injection to obtain an AOGCC-witnessed SSV test and then keep the well online for an
additional 1-2 months with the same 24-hour man watch. This will allow for stabilized production and
longer term production tests at final operating temperature. At that time, we will cease methanol
injection and set a K-valve.
Please call with any questions or concerns.
Thank you,
Torin Roschinger (alt. Anna Dube)
Well Integrity Coordinator
Office (907) 659-5102
Cell (406) 570-9630
Pager (907) 659-5100 Ext. 1154
7/30/2009
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com]
Sent: Friday, 7uly 17, 2009 10:41 AM
To: Maunder, Thomas E(DOA); Regg, ]ames B(DOA); Schwariz, Guy L(DOA)
Cc: NSU, ADW Well Integrity Engineer; Chmielowski, Jessie
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approva( to flow w/o a SSSV
~Qm,
As noted below, the AOGCC SSV test on WB-OS passed on 07/17/09. As requested, a
24 hour man-watch will be carried out while the we11 is on production.
Torin
__. _ _. ~ , . _~_.,_.
From: Yeager, Kevin E
Sent: Friday, July 17, 2009 9:42 AM
To: Chmielowski, Jessie; NSU, ADW Well Integrity Engineer
Cc: NSU, ADW Well Operations Supervisor; GPB, LPC Ops Lead
Subject: RE: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Torsn,
Per not$ below, the SSV was tested on WS-05 this morning and passed. The test vvas wi#nessed
by Mr.. Chuck Schieve ( AOGCC Field {nspector) #he ~SO and myself.
Kevin.
~. a w . ~ _ _._. ~, ~.., . ..~..... .r.,. .~ ~ ~~ .
From: Chmielowski, Jessie ~~~~~~~~~~~~ ~ ~ E-- ` " ~' ~ ~
Sent: Thursday, July 09, 2009 10:49 AM
To: Yeager, Kevin E; NSU, ADW Wells CT Scheduler
Cc: Warner, Ross L
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
Kevin.
Please see note below from Tom Maunder.
Note regarding SL drif# c~n WB-058:
6/12J09 - SL drifted with 2.50° centralizer to ~ 3862' SLM; stopped due to deviation; recovered 1l2
cup of frac sand.
Jessie
u,._.. ___ _. _ __ _ x_ . ~ v .. _ ~~,._
From: NSU, ADW Well Integrity Engineer
Sent: Tuesday, ]uly 07, 2009 9:53 AM
To: Chmielowski, Jessie; NSU, ADW Welfs CT Scheduler; GPB, LPC DS Ops Lead
Cc: NSU, ADW Well Operations Supervisor; Warner, Ross L; GPB, GPMA OTL; NSU, ADW Well
Support Supervisor
Subject: FW: WB-04 (PTD#1901680) & WB-05 (PTD#1981910) Approval to flow w/o a SSSV
All,
We have approval from the AOGCC to POP, SSV test, and produce WB-05 without a SSSU.
Fiease send us results af the SSII iest which needs to be conducteci within 48 hours of b~ing
pop'd. We'11 keep the AOGCC informed of the progress.
T#~ank you,
Anna Dube
_. . ._ _ . _~ , _ _~. ~._ .
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Tuesday, July 07, 2009 8:13 AM
WB-04 (PTD#1901680) & WB-OS (PTD#1981910) Approval to flow w/o a SSSV
~ ~
Maunder, Thomas E ~QQA~
From: NSU, A~W W~ell !n#egrity Engineer [NSUADIN1N~lIlntegrityEngineer~~P.cc~m]
Sent: Tuesday, July 07, 2Q09 9:57 AM
To: Maund~r, Th~mas E{D~A); Regg, J~mes B(DC?A); Schwartz, Guy L{DOA)
Cc: NaU, ADW Weli In#egrity Engineer
Subject: RE: WB-04 (PTD#19416$0) & WB~45 (PTD#198991p} ApprQVal to flow w/o ~ S~~V
Hi Tom,
Page 1 of 2
Thank you for the approval. We will keep you posted on the SSV test results and the production testing.
,,~~ ~~, ~.~
we~r r~te~;r~ty c~r~~r-~~c~~
~~~ 1~let~~ Crc~~rp
~hc~n~: ~~t~') 8~9~~1I~
P~~~r: ~9i~7~ ~~9-~~~1t1 x~~~~4
~.~~~~~~~~~ ~U~. ~ ~ Z~~~i
From; Maund~r, T#jornas E (D~A) [maitto:tom.maunder~alaska.gt~v]
Sent: Tuesday, July Q7, 20E19 8:13 AM
To: NSU, ApW W~N Integrity Engin~r; Regg, aames B(~OA}; Schwartz, Guy L(D4A~
subjec~: r~: V11B-04 (PTa#1901680) & WB-05 (Pl'D#198i91U) Appr~v~l to flc>w w/p ~ SSSV
~~~~,
~~ ~t0 g thi5 i~ ~ir~`iii~r tt~ ~9-~~, Your request to bring WB-05 on line as described in the J~ly email messge
(below) is approved. Con#act the A~GCG North Slope Inspector for oppor#unity to witness #he SSV iest, which
wili be done within 48 hours of restarting production. A faiiing SSV #est wiil require the well to be immediately shut
-n,
Tom Maunder, PE
AOGCC
~rc~m: NSU, A~W W~II TntegritY Enyineer [mailto;NSUADWWetlIntegrityEngineer~,alBP.com]
;5ent: Monday, .~uty Ub, 2U09 4:53 PM
To: Regg, 7ames B{DOA~; Maunder, Tf~omas E(~O~A); Schwartr, Guy L(DOA)
Cc; NSU, AQW Wel! Int~grity Engineer
Swbject; FW; W6-04 (PTD#1~01684) & WB-QS (PTD#1981910~ ~pprova! ta flow w/Q a SSSV
Hi Jim and Tom,
With your approval, we are read~ to place WB-45 {PTD #9981910} on production wit}~out ~ SSSV to tes# the we11.
To clarify the e-mail below, both WB-04 and WB-05 will be placed on production but only 1NB-0~ wi11 be produced
without a SSSV. Similar to P1-24, WB-05 vi+ili have 24-haur manwatch and continut~us me#han~! injection to
obtain an ROGCC witnessed SSV and then produce with weli for 1-2 months with 24-hour manwatch. The fast
SSV test was conducted and passed ~n 08/3Q/05. The well has not been onPine sir-ce this time except to for a
short production test late Novemembar 2008.
Please cai! with any questions or send yaur approval at your earliest convenence.
Thank you,
7/7f2009
WB-04 (PTD#1901680) & WB-OS (PTD#1981910) Approval to flow w/o a SSSV Page 2 of 2
~ ~
,~~ ~~, ~.~
~it~~t tn~e~ ~i~r ~cs~rd~~rat~r
~i~E~ ~It~t~s ~r~~~
Pht~r~~: (J~~) ~3~~~`~t1~
t~~ger: ~~~'~~ ~6~9i~1~t~ x1~~~
Fr~tnc NSU, AC3W W~11 T~ltegrity Engin~r
5ent: Thu 6~2~/~f~9 ~:12 RM
To; `Regg, James B(DQA)'; 'Maunder, Thomas E(DOA)'
Subject: WB-t14 (PTp#i9{~1680) & WB-Oa ~PTD#19819~0) Approvai to fl~w w/o a SS~V
JixnlTom,
WB-04 (PTD#1901680j & WB-45 (PTD#1~$1910) are both natural producer~ that pre~nt sirnilar
hydxate problems ta that of P 1-2~. Recently, the AOGCC granted approval tQ flow P 1-24 withaut a
SSSV contingent upon a passing SSV test within 4~ hours of initiai production. VVe are re~u~sting
approval to place wells WB-Q4 & WB-05 on productian with a 24~hour manwatch and car~tinuous
methanol injecltion to obtain an AOCr~C-witnessed SSV test and th~n ke~p the w~l~ Qnline for an
additional 1-2 m,onths with the sar~e 24-hour man watch. This wili allow f4r stab~li~ed production ar~d
longer t~rm production tests at final operafiin~ tempera~ure. At that time, we wiii cease metha~ol
injection and set a K-valve.
Pl~ase eall with any quest+ons or concerns.
Thank you,
Torin Roschinger {alt. Anna ~ub~)
Weli Ir~t~grity Coordinatar
Office (907) 659-51 Q2
Cell (446) 570-963U
Pager (907) 659-5100 ~xt. 1154
7/'7f20Q9
~/~%~
STATE OF ALASKA //-/a•oS
y ALA OIL AND GAS CONSERVATION COM~SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ Other
Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Extension
Change Approved Program [] Operat. Shutdown Perforate ~ - Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development Exploratory ~ 1s8-1910 -
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-22817-02-00
7. KB Elevation (ft): 9. Well Name and Number:
41 KB WB-056 -
8. Property Designation: 10. Field/Pool(s):
ADLO-034627 PRUDHOE BAY Field/ W BEACH OIL Pool
11. Present Well Condition Summary:
Total Depth measured 16100 ~ feet Plugs (measured) 15765
true vertical 8931.1 - feet Junk (measured) 15972
Effective Depth measured 16012 feet 7 ~~'~~~1~~'~I~~" ~'`?~' ` 'k ~~
true vertical'' 8908.1 feet
Casing Length Size MD TVD Burst Collapse
Conductor 89 20" 133# H-40 43 - 132 43 - 132 3060 1500
Surface 6599 9-5/8" 40# L-80 42 - 6641 42 - 4837 5750 3090
Production 13773 7" 26# L-80 39 - 13812 39 - 8756 7240 5410
Liner 21 5-7/8" LINER TIEBACK 13597 - 13618 8637 - 8649
Liner 2480 4-1/2" 12.6# 13CR80 13618 - 16098 8649 - 8931 8430 7500
Perforationd'epth: Measured depth: SEE ATTACHED -
True Vertical depth: _ _ _ _
Tubing: (size, grade, and measured depth) 3-1/2" 9.3# L-80 37 - 13609
0 0 -
Packers and SSSV (type and measured depth) 4-1/2" Baker S-3 Hydro Set Packer 13513
0 0
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
;~`~ ~ a-c-`,
1Q0
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
- OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: SI
Subsequent to operation: SI
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~"' Development - Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil "v - Gas ~ WAG ~ GINJ WIND WDSPL "`
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble W~c\l `~4~ ~~ JCI~ Gulp
~Cl
Printed Name Gary Prebl Title Data Management Engineer
Signature Phone 564-4944 Date 11/5/2008
Form 10-404 ~ed 04/2006 Submit Original Only \ ~ ~~
J '~.,.
WB-05B
198-1910
PFR~' ATTA(_NMFNT
•
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
WB-05B 2/22/99 PER 15,930. 15,939. 8,888.06 '8,890.02
WB-05B 2/22/99 PER 15,940. 15,950. 8,890.25 8,892.54
WB-05B 2/23/99 PER 15,900. 15,920. 8,882.12 8,885.97
WB-056 2/28/99 RPF 15,900. 15,925. 8,882.12 8,887.
WB-05B 3/1/99 APF 15,875. 15,900. 8,877.88 8,882.12
WB-05B 5/15/99 FIL 9,098. 15,939. 6,190.29 8,890.02
WB-056 7/4/99 FCO 9,098. 15,994. 6,190.29 8,903.49
WB-056 7/5/99 APF 15,820. 15,880. 8,869.49 8,878.67
WB-05B 7/6/99 FIL 13,986. 16,025. 8,788.63 8,911.46
WB-056 7/14/99 FCO 13,986. 15,972. 8,788.63 8,897.92
WB-05B 8/3/05 BPS 15,765. 15,820. 8,861.27 8,869.49
WB-05B 8/4/05 APF 14,525. 14,550. 8,797.57 8,796.09
WB-05B 8/4/05 APF 14,850. 14,875. 8,806.67 8,807.86
WB-05B 8/4/05 APF 14,875. 14,900. 8,807.86 8,808.91
WB-056 8/4/05 BPS 15,765. 15,950. 8,861.27 8,892.54
WB-05B 8/6/05 APF 14,500. 14,525. 8,799.05 8,797.57
WB-05B 10/30/08 APF 13,850. . 13,890. 8,773.39 8,782.66
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
• •
WB-05B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE SUMMARY -
10/25/2008 CTU # 6, W 16300' of 1.75" CT, Travel to location ,Begin to rig up.***Job
'.Continued to 10/26/08*''*
_.
10/26/2008 CTU # 6, W 16300' of 1.75" CT, Continued from 10/25/08, (interact publishing)
Finish Rigging up. RIH with baited sure catch overshot. Tag liner ton at 1384.'
ctmd. Unable to work past. Pull to surface. Tools lightly coated with
';paraffin/asphaltene. ample of this material is 42% soluble in diesel, and 75%
;soluble in diesel/xylene (see job log for details). MU and RIH hydraulic centralizer
i.and hydraulic JDC. Tag liner top at 13583' ctmd; actuate hydraulic centralizer and
'run cleanly through liner top. Dry taq and latch IBP at 15743' ctmd. Pull IBP and
?.drag uphole to 13939' ctmd. Attempting to jar IBP through 13939' ctmd. Pump 1%
KCL w/ 0.6% Safelube ,could not come up but finally able to go down. Called
-Town, and It was decided to push it to bottom. **"' Job Continued on 10/27"*
10/27/2008.CTU # 6, w 13600' of 1.75" CT, Continued from 10/26/08, (Push IBP to bottom ,
;add Perfs) .Pushed the IBP to 15,716'. POOH, Pickup a Si-Di Hipptripper. RIH
';with single-directional hipp-tripper, hydraulic centralizer, and hydraulic release
::JDC. Tag liner top, activate hydraulic centralizer to work through. Tag and latch
IBP at 15718' ctmd. Difficult pumping through toolstring while latched on to fish;
;surge coil pressure and release from IBP. Pull to surface. MU and RIH with
;hydraulic centralizer, single-directional hipp-tripper, ported sub, and ported blind
'.OS. Could not enter liner after multiple attempts, POOH and change out blind box
overshot (flat bottomed) with a Sure Catch over shot without collets and a mule
;shoe on bottom, RBIH ****Job continued on 10/28/08'*'`*
10/28/2008:CTU # 6 w/16,300' of 1.75" CT, (Pull IBP & add Perfs) Job continued from
:10/27/08. RIH with Hip-Tripper with a Sure catch overshot (blinded) with mule
-.shoe bottom and collet grapple removed.. Passed into liner on third try. Ran in and
'tagged IBP at 15713', attempted to push IBP with Hip tripper working, but stalled i
as soon as t e ip tapper started working. Had over pulls of 12k, and was stuck
;.for - 2 hours before pulling free. POOH. Reconfigure overshot. MU and RIH with
;.agitator with blinded, mule-shoed overshot. Tag liner top at 13580' ctmd.
;=Aggressively agitate in an attempt to enter liner top; unable to enter liner top. Pull
to surface. Cut pipe, change packoffs and do chain inspections.'`** Job continued
ion 10/29/08
10/29/2008~**'`CTU # 6 w/16200' of 1.75" CT -Pull IBP'*"*Job Continued from 10/28, Make
up agitator with a Hound nosed nozzle -Surface test agitator -not working - LD
''agitator -order new tool -Test new agitator -working good -RIH - no problems
'entering liner -tag IBP at 15709 -agitator working on IBP. Unable to push IBP
.any further. POOH and roll hole over to diesel. OOH. Secure well and rig back to
!PU SLB pert guns. Job Continued on 10-30-08 WSR.
• •
3 CTU #6 w/1.75" OD CT. (interACT not broadcasting) MU and~RlH~with 20' (2.5"
PJO, 6 SPF, 60 DEG Phase) perforating gun. Locate x nipples at 13558', 13538',
13464' ctmd. Correct to 2/21/99 SLB Memory CNL. RIH to perforating interval.-
perf from 13870' - 13890'. POOH. All shots fired and ball recovered. MU new
an pe ora ing gun #2. RIH. Locate nipples and correct to 2/21/99 SLB
Memory CNL. Perforate from 13850' - 13870'. POOH. Freeze protect well with
20 bbls 60/40 methanol. OOH. Confirm all shots fired and recover 1/2" ball.
Notify DSO of well status. RDMO. '`"*Job Complete'**
FLUIDS PUMPED
BBLS
55 diesel-
52 60/40 METH
107 Total
07/23/08
Sch~rberg~r
N0.4786
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, SUit8100
Anchorage, AK 99501
Well .Inh It 1 nn rlne :..~:.... n..~., n~ n_~__
WB-05 12021166 MEM SBHPS ~ 06/13/08 1 1
G-16 11982438 PRODUCTION P OFILE /~ ~ a 06/21/08 1 1
R-12 12034908 PRODUCTION PROFILE ~~ 07/14/08 1 1
01-03A 12017505 PRODUCTION PROFILE /%S- `(p 07/15/08 1 1
J-15B 11970838 SCMT _ 07/17/08 1 1
01-23 12057631 PRODUCTION PROFILE 07/16/08 1 1
B-18 12071875 LDL .r O ~ 07/20/08 1 1
4-04R'-26 11999025 LDL ~
~ 07/12!08 1 1
J-14A 12066524 MCNL p (- 05/25/08 1 1
G-156 11963096 MCNL _ V(o '" 05/30/08 1 1
L3-19 11968944 RST X65 - 06/07/08 1 1
L2-11 12014019 RST ~c 06/05/08 1 1
`rte r~v.v~v ~~a.GUVG nGVGIf ~ ~~ JIVIYIIYV AIYV nLl{J n1Y11Y1a VIYC VVr'T CAVIL 1 V:
BP Exploration (Alaska) Inc. ~td,~.l~y'9~® AUK .y ~ ~nn~
Petrotechnical Data Center LR2-1 t U l UU
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
,;.
Alaska Data & Consulting Service
2525 Gambell Street, Suite 40~
Anchorage, AK 99 3-2838
ATTN: Beth
Received by:
•
•
Plug Perforations 0
Perforate New Pool D
Perforate 0
4. Current Well Class:
Development r;:?'.
Stratigraphic
'\ STATE OF ALASKA')
AlA~. .,!. Oil AND GAS CONSERVATION COM\¡II...i~ION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon D Repair Well D
Performed: Alter Casing D Pull Tubing D
Change Approved Program D Operat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
3. Address: P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
41 KB
8. Property Designation:
ADl-034627
11. Present Well Condition Summary:
Total Depth
measured 16100
true vertical 8931.1
Effective Depth
measured 16012
true vertical 8908.1
Casing
Conductor
Surface
Production
Liner
Liner
Stimulate D ;. . 'i:D,t~!1.r, D
WaiverD Time Ex{ehsidhE]
Re-enter Suspended Well D
5. Permit to Drill Number:
Exploratory 0. 198-1910
Service 6. API Number:
50-029-22817-02-00
9. Well Name and Number:
WB-05B
10. Field/Pool(s):
PRUDHOE BAY Field/ W BEACH Oil Pool
feet
feet
Plugs (measured)
Junk (measured)
15765
15972
feet
feet
i~l~ß~~~Nt~L SEP 2; J 2.0œ~
length Size MD TVD Burst Collapse
89 20" 133# H-40 43 - 132 43 - 132 3060 1500
6599 9-5/8" 40# l-80 42 - 6641 42 - 4836.92 5750 3090
13773 7" 26# l-80 39 - 13812 39 - 8756.33 7240 5410
21 5-7/8" Liner Tieback 13597 - 13618 8636.99 - 8648.76
2480 4-1/2" 12.6# 13CR80 13618 - 16098 8648.76 - 8930.58 8430 7500
Perforation depth:
Measured depth: 14500 - 14550
True Vertical depth: 8799.05 - 8796.09
Tubing: (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
o
158
x
14850 - 14900
8806.67 - 8808.91
3-1/2" 9.3#
l-80
37 - 13609
3-1/2" HES Series 10 SSV
4-1/2" Baker S-3 Hydro Set Packer
1993
13513
RBDMS BFL SEP 162005
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casing Pressure
o 0 0
2563 6 100
15. Well Class after proposed work:
Exploratoryr Development ~
16. Well Status after proposed work:
Oil P' Gasr WAGr
Tubing pressure
o
965
Service
r
r
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
GINJ r WINJ r 'fJQ.SPL
Sundry Number or N/A if CJ). ~xempt:
,
, '1'05-148
,,;I
Contact Sharmaine Vestal
Printed Name Sharmaine Vestal
~
Signatu~~
~
Form 10-404 Revised 04/2004
Title Data Mgmt Engr
Phone 564-4424
Date 9/13/2005
ODI0¡rlAL
" ! "l ¡ \ i'_
..' K\ ,,~} g ¡ 1
Submit Original Only
'"
)
)
WB-OSB
DESCRIPTION OF WORK COMPLETED
f NRWO OPERATIONS
EVENT SUMMARY
I ACTIVITYDATE I SUMMARY
8/2/2005 MIRU CTU #5 17,200' of 1-3/4" CT 800K running feet w/ 308K in chrome
Job scope: Fish Slickline tools string, Memory Log for depth control, Set Baker
IBP, and add 100' of perforations
RIH w/ 2.625" od Hydrulic overshot, Hydrulic centralizer, Rupture disk, Disco,
OJ DCV's., CTC. OAL = 20.67'
8/3/2005 ***** Continued from 8/2/05 ***** Tagged 4 1/2" liner top with overshot. Kick
on pump & expand hydraulic centralizer. RIH. Tagged fish @ 15,801'.
Push/circ down to 15,847'. PUH. Pull over weight @ 14,362'. Jar and work
on area. Release off fish. Wash and push fish back to 14,420' and circ diesel
to 13,800'. RBIH to 15,860'. POOH (clean). Fish recovered. LD slickline
tools and guages. MU MHA w/ nipple locator and Baker IBP. OAL = 22.99'.
RIH. Locate x-nipples at 13,482',13,553', and 13,574' CTM. Correlate to SLB
memory GR/CCL dated 2/21/99. Correct depths and RIH. Set 2.5" Baker IBP
center of element at 15,765' (11.10' OAL, 1-3/8 FN). Test IBP to 2000 psi
(good test). POOH, job continued on 8/4/05 WSR...
8/4/2005 ***Continued from 8/3/05 WSR*** RIH w/ 25' of 2-1/2" PJ, 6 SPF, 60 deg
phase Perf Guns. Gun run #1: perf from 14875-14900' corrected to MD. Gun
run #2: perf from 14,850' - 14,875' corrected to MD. Gun run #3 perf 14525-
14550' MD. Each RIH requires taking returns to avoid pressuring up on well
(tight perfs). Job continued on 8/5/04 WSR.
8/5/2005 *** Job continued from 8/4/05 WSR*** RIH w/ gun #4. Develop pin hole in coil
at 7410' CTM. R/D and go to yard to swap reels. Return to location, drift coil,
perform weekly BOP. Re-run gun #4 (2.5", PJ, 6 SPF, 60 deg phase). RIH at
report time. Job continued on 8/6/05 WSR.
8/6/2005 ***Job continued from 8/5/05*** Continue RIH w/ gun #4 (2.5", PJ, 6 SPF, 60
deg phase). Perforate 14500-14525' tied into MD with nipple locator. ***Job
compete.**** Ask operator to POP and test.
FLUIDS PUMPED
BBLS
90 Diesel
500 Gallons of N2
10 1 % XS KCL
490 Methanol
'~' :,~ 'h\ ~[~
~, u !J~ ¡ I [~
in U i ~ 'r I [F
,~'" ' ' /,' \ \ U Lb
(~l' ¡-;:ïJ¡
II !!!
I It I!.
: :F
\~ ¡J
)
/1\' n f/'·-ß1 i(~'~\ ¡1~"./ m",
,I, " ,I) 'l:U, " " I 'I"
IiI \ ': : II ') :,', ,¡, ,!( \
, [: \~ !: ¿ ,/1:\ , '",'" i: ", ii;~I\ \
;' I !" ; ¡ ¡ J':~ "',:!, \, ;' il \
iLflJ !~ Lu (ill iJ!~ ¡Ftl
)
ALASIiA OIL AIVD GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
~~~~ \0',1
333 W. pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ross Warner
Production Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
SCANNED JUN 1 7 2005
Re: Prudhoe Bay WB-05B
Sundry Number: 305-148
Dear Mr. Warner:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of the
Commission to witness any required test. Contact the Commission's petroleum field
inspector at (907) 659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
file with the Commission an application for rehearing. A request for rehearing is
considered timely if it is received by 4:30 PM on the 23rd day following the date of this
letter, or the next working day if the 23rd day falls on liday or weekend. A person
may not appeal a Commission decision to Superi unless rehearing has been
requested.
DATED this ~y of June, 2005
Enel.
RBDMS 8FL JUN 1 5 2D05
UZl (P -'S"-óf \¡,JGÆ- 6/1 S J 2,() 05
) STATE OF ALASKA Ó)~ '115/5 RECPVM:"'"'"
ALASKA OIL AND GAS CONSERVATION COMMISSION "'- ~"'._" Œ ' [:,
APPLICATION FOR SUNDRY APPROVAL JUN 1. 4 2005
20 AAC 25.280
1. Type of Req uest:
Alter Casing
Change Approved Program
Abandon D
D
D
Suspend D
Repair Well D
Pull Tubing D
Operation Shutdown D
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
!.;;; :,~-,:': ~-\' ~"': ", ¡
Perforate[i] WàiverE)
StimulateD Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
198-1910 /
Other 0
2. Operator
Name:
3. Address:
BP Exploration (Alaska), Inc.
Development Œ]
/
Exploratory D
P.O. Box 196612
Anchorage, Ak 99519-6612
11. Presen1
Total Depth MD (ft):
16098
Casing
Total Depth TVD (ft):
8941.6
StratigraphicD Service D
9. Well Name and Numb/ef:
WB-05B
10. Field/Pool(s): /'
Prudhoe Bay Field / W Beach Oil Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft):
16012 8867.1
Size MD TVD
6. API Number /
50-029-22817-02-00
7. KB Elevation (ft):
52.00 KB
8. Property Designation:
ADL-034627
CONDUCTOR
LINER
LINER
PRODUCTION
SURFACE
top bottom top bottom
89 20" 133# H-40 43 132 54.0 143.0
21 5-3/4" Liner Tieback 13597 13618 8648.0 8659.8
2480 4-1/2" 12.6# 13Cr80 13618 16098 8659.8 8941.6
13773 7" 26# L-80 39 13812 50.0 8767.3
6599 9-5/8" 40# L-80 42 6641 53.0 4847.9
Plugs (md): Junk (md):
None 15972
Burst Collapse
3060 1500
8430 7500
7240 5410
5750 3090
Length
Perforation Depth MD (ft):
14500 - 14550
14850 - 14900
, S g ~O- (c; (( l '5
\uCik
Perforation Depth TVD (ft):
8799 - 8796.0
8807 - 8809.0
Tubing Size:
3-1/2 "
Tubing Grade: Tubing MD (ft):
9.3 # L-80 37
13609
Packers and SSSV Type:
3-1/2" HES Series 10 SSV
4-1/2" Baker S-3 Hydro Set Packer
Packers and SSSV MD (ft):
1993
13513
12. Attachments:
13. Well Class after proposed work:
Description Summary of Proposal ŒJ
Detailed Operations ProQram D BOP Sketch D
14. Estimated Date for
Commencing Operation:
June 28, 2005
/'
Exploratory D Development ŒJ
15. Well Status after proposed work:
Oil Œ] / GasD PluggedD
WAG D GINJD
Service D
Abandoned D
Contact
WINJD WDSPLD
Prepared by DeWayne R. Schnorr 564-5174.
Ross Warner
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Date:
Printed Name
Signature
Ross Warner _ '//
C-.~ ¿'æ-~
Title
Phone
Production Engineer
564-5359
6/14/05
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness
Other:
Sundry Number:
.3~.s-.. / t',? r
BOP TestD
Mechanciallntegrity Test D
Location Clearance D
Subsequ
'--
Form 10-403 Revised 11/2004
0", r,<,"
, ~' f \,
BY ORDER OF
THE COMMISSION
Date: ¥ø(
SUBMIT IN DUPLICATE
'\
,)
)
June 14, 2005
Winton Aubert
Alaska Oil & Gas Conservation Commission
333 West ih Avenue Suite 100
Anchorage, AK 99501
Dear Winton:
/
RE: Sundry Notice for WB-05B --- Add Perforations
/...//~-"'''\)
BP Exploration .AI~ska, Inc. proposes t~d~/~erforati~ns to well WB-05~ which
has been shut-In since 08/08/2002 due tQJöw production & hydrates. /'
Summary:
1
2
3
4
5
6
o
C
C
C
C
o
Hot oil the tubing
2.5" Nozzle/with TEL gauge run with CTU. Unit #5 or #9
Fish SBHP Gauges
Set Inflatable Bridge Plug
Coil Conveyed four perforating gun runs.
Obtain post perforating well test.
I
Well WB-05B is currently shut-in. Tubing has to be hot oiled before proceeding
with these operations. Well will then be production tested for rate.
Zones to be perforated are: 14500' - 14550' & 14850 - 14900' MD.
For questions please call Andy Parker: 564-5766 (work), 694-2990 (home), 440-
8006 (cell). Ross Warner: 564-5359 (work), 333-9017 (home), 250-3441 (cell).
Sincerely,
Ross Warner
c ---'~lf~
Production Engineer
TREE: CAMMERON 4-1/16"
WELLHEAD: FMC
ÄCTUATOR; " BA kER
f'H'M..,....,.,.I\,.,.."....,',..,..,.,.,.,.~I'M.,~"""'......N:M¥N'
KB. ELEV : 52'
BF.äËV;
'kÖp;'~' '"
Max Ängle :
'batumMD;
bâtumTVÖ; "
')
WB-OSB /'
) I SAFETY NOTES
. '"'''''''' "",,,..,,,,,,,,,,,.
2559'
94@14431ï
" 15589;
, '8aoifSs
..5 - 34'1
ITOPO~LNR-TIEBACK 1-1 13597' I
1993' 1-1 HES SERIES 10 SSSV, ID: 2.813"
GAS LIFT MANDRELS
~ ST MD TVD DEV TYÆ VLV LATCH PORT DATE
1 2301 2300 6 MMG RK
2 3732 3595 43 MMG RK
3 5981 4611 70 MMG RK
4 8000 5590 54 MMG RK
5 9965 6606 61 MMG RK
6 11774 7613 54 MMG RK
7 12776 8176 58 MMG RK
8 13182 8399 56 MMG RK
I 13493' 1-13-1/2" X NIP, ID: 2.81" 1
---l 13513' 1-17" X 4-1/2" BKR S-3 HYDRO SET PKR, ID: 3.88" 1
I 13567' 1-13-1/2" X NIP, ID: 2.81" 1
I 13587' 1-13-1/2" X NIP, ID: 2.81" 1
I
13609' 1-13-1/2" TUBING TAIL, WLEG, ID: 2.990" 1
13618' 1-1 ELMD TT LOGGED 02/21/99 1
,
I 9-5/8" CSG, 40#, L-80, ID: 8.835" 1-1
6640'
~
Minimum ID = 2.813" @ 1993'
3-1/2" HES Series 10 SSSV NIP
L
-
13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID: 2.992" l-i 13609'
I
I TOP OF 4-1/2" LNR 1-1 13618'
I 5-7/8" LNR-TIEBACK, ID: 4.438" 1-1 13618'
I
I
17" CSG, 26#, L-80, ID: 6.276" 1-1 13812' ~
~
I PBTD 1-1 16012'
14-1/2" LNR. 12.6#. 13CR-80, .0152 bpf, ID: 3.953" 1-1 16098'
1- SL TOOLS IN HOLE OS/26/05. 10' 1-7/8
ROLLER STEM w / 2.2" WHEELS 1-3/4"
OIL JAR 1-7/8 LSS 2.5" CENT TECH
& SBHPS GAUGES
1- FISH - 6-1/2' OF 1" PlÆ LOOKING UPW/
1 2-1/2" CENT 3 FT FROM TOP ADN A
2-1/2"BULLNOSE ON BOTTOM
ÆRFORA TION SUMMARY
REF LOG: CT MEMORY CNL LOG ON 02/21/99
ANGLEATTOPÆRF: 81 @ 15820'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 15820-15880 0 07/05/99
2-1/2" 4 15875-15900 0 03/01/99
2-1/2" 4 15900-15950 0 02/23/99
2-1/2" 4 15900-15925 0 02/28/99
DATE
02/22/99
09/17/01
OS/29/05
06/07/05
REV BY COMMENTS
ORIGINAL COM PLETION
RNlTP CORRECTIONS
RLW/PJC TREE/ACTUATOR CORRECTION
RWLITLH SL TOOLSTRING (FISH)
DATE
REV BY
COMMENTS
PRUDHOE BA Y UNIT
WELL: WB-05S
ÆRMIT No: 98-191
API No: 50-029-22817-02
SEC 25, T12N, R14E 3511.68 FEL 4855.21 FNL
BP Exploration (Alaska)
100 00
t
100.00
00
Al.ASKART 1 4
NET
CHECK NO.
00140318
VENDOR
DISCOUNT
DATE
07/13/98
100 00
- - -- - - - - - - ~ - - - - - - - - - - - - - - - - - - -" - -
.TTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
100.00
TOTAL ..
~: :2POD(P3
~ud d~·. 1l1o?/q6
\jJ¿l ~ : \¡VB~066
@
s/h carol withey x 4114
GROSS
DESCRIPTION
70998 CK070998G
HANDLING INST:
INVOICE I CREDIT MEMO
DATE
140318
198-191-0 PRUDHOE BAY UN WB WB-05B 50- 029-22817-02
Roll #1: Start: Stop Roll #2: Start Stop
MD 1_6100._ TVD 08931 Completion Date: /-~g~2/99 Completed Status: 1-OIL
BP EXPLORATION
(ALASKA) [NC
Current:
T Name Interval
C 9165 ~-~ 1-12 SCHLUM CDR-IMP
C 9270~ 1 SCHLUM MEM GR/CCL
L DRL ~'~'~- FINAL 13807-14971 PB2
L IMP-CDR-MD ~' FINAL 6700-14000 PB1
L IMP-CDR-MD,----~- FINAL 6640-16100
L IMP-CDR-TVD ~:--"~'-' FINAL 4900-8860 PB1
L IMP-CDR-TVD ~ .... FINAL 4900-8800
L IMP-GR-MD
L IMP-GR-TVD
L MEM GR/CCL /--
L MNCLj
NDT-MD
NDT-TVD
L RFT L-~''
.
L STAT BHP
L STAT BHP
R SRVY RPT
R SRVY RPT
R SRVY RPT
S WASH/DRY # 1002
T 9032 t.~
T 9041 ~
T 9043 ~
'\
FINAL 13807-14971 PB2
FINAL 13807-14971 PB2
FINAL 12940-16023 7/5/99
FINAL 13321-16025
FINAL 4900-8860 PB1
FINAL 4900-8860 PB1
FINAL 13300-13900
FINAL 13200-13887
FINAL 13276-13836
SCHLUM 13799.38-14971. PB2
SCHLUM 0-14060.5 PBI
SCHLUM 0-16100
WASH/DRIED 6660-16100
1 SCHLUM MCNL
1-4 SCHLUM IMP PB2
1 SCHLUM IMP-CDR/ADN PB1
Sent Received T/C/D
·
OH 4/14/99 4/27/99
CH 8/12/99 8/13/99
OH 2 4/8/99 4/27/99
OH 3/30/99 4/27/99
OH 4/14/99 4/27/99
OH 3/30/99 4/27/99
OH 4/14/99 4/27/99
OH 5 4/8/99 4/27/99
OH 5 4/8/99 4/27/99
CH 2 8/12/99 8/13/99
CH 2 3/26/99 3/26/99
OH 3/30/99 4/27/99
OH 3/30/99 4/27/99
OH 4/14/99 4/27/99
CH 5 12/14/99 12/29/99
CH 5 7/7/00 7/19/00
OH 12/8/98
OH 12/8/98
OH 12/8/98
OH 12/1/98 12/1/98
CH 3/26/99 3/26/99
OH 4/8/99 4/27/99
OH 3/30/99 4/27/99
Thursday, February 01, 2001 Page 1 of 1
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 315
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
7/7/00
Well Job # Log Description Date BL Sepia CD
WB-05B STATIC BOTTOM HOLE 000621 I 1
WB-06 STATIC B.H. PRESSURE LOG 000622 I I
m~-/-rl~ir r~
gr'l
SIGNE[~~~ DATE: ,JUL ~ 9 2000
Alaska 0il & Gas Cons. Commission
Anchorage
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A'I-I'N: Sherrie
NO. 121017
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
(Open Hole)
Well Job # Log Description Date BL Sepia CD
WB-05B STATIC BO'II'OM HOLE 12/7/99 I 1
WB-06 STATIC Bo'FrOM HOLE 12/5/99 I 1
~_. ____ ~l::t~t::l v mtJ
(~ ~a/~(~a~/~'~ DATE: 1, i!':~'; 2 9 1999
SIGNED:
Alel(a Oil & Gas Cons. C;ommis,~o~
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317~ou.
12/14/99
STATE OF ALASKA '- .....
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
¢;;(] Oil [] Gas I~ Suspended [-] Abandoned [~ Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 98-191
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612_. _ _ 50-029-22817-02
4. Location of well at surface ~' .~YL_~,~,~' "'~,~,:r.~j~ '~ ~ ~i-"~~- 9. Unit or Lease Name
105'NSL, 3219'WEL, SEC. 25, T12N, R14E, UM !~~[~? West Beach State
At top of productive interval -, 10. Well Number
5213' NSL, 4413' EWL, SEC. 20, T12N, R15E, UMi ~.~¢J?t~ i I - WB-05B
At total depth ;i,~-~_~'~7-~-~-i ,~ ~. 11 Field and Pool
, , , '~%, ..¢- .......... ',~ ·
429 NSL, 1763 EWL, SEC. 20, T12N, R15E, UM
Prudhoe Bay Field /West Beach
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
DF = 52'I ADL 034627
12. Date Spudded10/16/98 I 13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if OffshOre I 16' NO' Of cOmpletiOnsl 1/26/98 2/22/99 N/A MSLI One
17. Total Depth (MD+TVD) 118. P,ug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
16100 8931 FTI 16012 8908p FTI [~Yes I~NoI 1993' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES, CDR, PWD, DWOB, DTOQ, ADN, RFT, NEU
23. CASlNG~ LINER AND CEMENTING RECORD
CASING SE~I-ING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 133# H-40 Surface 121' 30" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 42' 6630' 12-1/4" 2970 sx PF 'E', 860 sx Class 'G'
7" 26# L-80 39' 13812' 8-1/2" 535 sx Class 'G'
4-1/2" 12.6# 13Cr80 13612' 16098' 6" 341 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 4 spf 3-1/2", 9.3#, L-80 13609' 13513'
MD TVD ~r" ii' MD'.-'~." ~':r. : '~' TVD
15820'-- 15880' 8869'-- 8879' "':' ':'' ''~ i :.'' '" i: '
15875' -- 15900' 8878' -- 8883' 26' ACID, FRACTURE, CEMENT SQUEEZE, ETC.
15900' - 15920' 8883' - 8887' . i: :' ;'3,':: DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
15920' - 15950' 8887' - 8893' ' """:" ;'
Freeze Protect with 125 Bbls of Diesel
:i?'::':~-~.~ i.~i;" i:~:::-...:~::.~i;:;. ~;!;~,: :ii.~ ;;~,-:~ 15820' - 15950' See Attached Post-Rig Completion Summary
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
July 26, 1999] Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL O~L GRAWTY-API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lith01ogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Refer to recorded mud Icg.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
K-15 6912' 4968'
Colville Group 10418' 6834'
West Sak Sand 10418' 6834'
West Sak Seismic 10434' 6843' C01 FtO TIAL
K-12 10588' 6923'
HRZ 13804' 8752'
Kalu bik 13811' 8756'
Kuparuk 13825' 8763'
Miluveach 16056' 8919'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is,true and correct to the best of my knowledge
Signed ~"/~ ~
Terrie Hubble Title Technical Assistant III Date
WB-05B 98-191 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
~NSTRUCTIONS
GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27'.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
08 Oct 98
09 Oct 98
West Beach
Progress Report
Well WB-05B Page 1
Rig POOL 7 Date 11 August 99
06:00-06:00
06:00-09:30
09:30
09:30-11:30
11:30
11:30-18:00
18:00
18:00-22:00
22:00
22:00-04:30
04:30
04:30-05:45
05:45
05:45-06:00
05:45-06:00
06:00-10:00
06:00-06:45
06:45
06:45-10:00
10:00
10:00-18:00
10:00-18:00
18:00
18:00-20:00
18:00-18:30
18:30
18:30-20:00
Duration
24 hr
3-1/2 hr
2 hr
6-1/2 hr
4 hr
6-1/2 hr
1-1/4 hr
1/4 hr
1/4 hr
4 hr
3/4 hr
3-1/4 hr
8 hr
8 hr
2 hr
1/2 hr
1-1/2 hr
Activity
Move rig
Rigged down Drillfloor / Derrick
PJSM. Finish rinsing out pits, pull wires, and skid
floor.
Equipment work completed
Rigged down Drillfloor / Derrick
Secure cellar doors and raise walls, raise cellar
foot and secure.
Equipment work completed
Removed Drillfloor / Derrick
PJSM - move motor complex to west beach pad. Move
sub structure away from well and off pad.
Equipment work completed
Rig moved 75.00 %
Move substructure module to West Beach pad and spot
over hole.
At well location - Cellar
Rigged up Drillfloor / Derrick
Lower foot and wind walls, skid rig floor and set
motor module. Rig up floor and pipe shed.
Equipment work completed
Rigged up Handling equipment
Fill shed with 4" DP. PU 4" handling equip.
Equipment work completed
Held safety meeting
Finished holding saftey / enviromnental meeting w/
crews.
Held safety meeting
Saftey / environmental meeting w/both crews.
Accepted rig @ 0600 hrs 10-9-98.
Move rig (cont...)
Held safety meeting (cont...)
Saftey / environmental meeting w/both crews.
Accepted rig @ 0600 hrs 10-9-98.
Completed operations
Rigged up Drillfloor / Derrick
Partially completed pre-spud check list. Load 4" DP
in pipe shed
Stopped: To pick up/lay out tubulars
Accepted rig @ 0600 hrs 10-9-98. Pit module on L1
Pad - hydrolic cylinder on moving system being
repaired.
4in. Drillpipe workstring run
Singled in drill pipe to 29.0 ft
Pick up 4" drill pipe and stand back in derrick -
strap and drift.
165 joints picked up
Wellhead work
Installed Hanger plug
Csg pressure 0 psi. Pulled BPV and set TWCV. Test
to 1,000 psi. Test tubing hanger and 7" pack off.
Equipment work completed
Removed Xmas tree
PJSM. ND tree. Pull sbms sleeve.
Facility
Date/Time
10 Oct 98
11 Oct 98
Progress Report
West Beach
Well WB-05B Page 2
Rig POOL 7 Date 11 August 99
20:00
20:00-02:00
20:00-02:00
02:00
02:00-06:00
02:00-06:00
06:00-07:00
06:00-07:00
07:00
07:00-20:30
07:00-10:00
10:00
10:00-20:30
20:30
20:30-04:00
20:30-02:30
Duration
6 hr
6 hr
4 hr
4 hr
1 hr
1 hr
13-1/2 hr
3 hr
10-1/2 hr
7-1/2 hr
6 hr
Activity
Equipment work completed
Nipple up BOP stack
Installed BOP stack
NU BOP's. Change top rams to 4".
Aborted equipment work
Move rig
Rigged up Choke manifold
Modify choke line.
Move rig (cont...)
Rigged down Choke manifold
Modify choke manifold.
Equipment work completed
4in. Drillpipe workstring run
Singled in drill pipe to 0.0 ft
PU 4" drill pipe and stand back in derrick - strap
and drift.
Stopped: To change handling equipment
Singled in drill pipe to 0.0 ft
Change handling tools. PU 5 1/2" DP and stand back
in derrick. ( move pit module, #3 pump, and
rockover tanks to WB pad).
Stopped: To test equipment
Test well control equipment
Tested BOP stack
Test BOP's as per SSD policy to 250 psi low and
5,000 psi high. Hydril to 3,500 psi. Accumulator
drill. Test witnessed by John Spalding with AOGCC.
No leaks. Spill drill @ 0100 hrs - 3 min.
02:30
02:30-03:15
03:15
03:15-04:00
04:00
04:00-06:00
04:00-06:00
04:00-06:00
06:00-09:00
06:00-09:00
09:00
09:00-13:00
09:00-12:00
3/4 hr
3/4 hr
2 hr
2 hr
2 hr
3 hr
3 hr
4 hr
3 hr
Pressure test completed successfully - 5000.000 psi
Retrieved Tubing hanger
Back out lock down screws. Pulled tbg hanger and
one jt 4.5" tubing - LD same.
Equipment work completed
Tested Bottom ram
Set test plug and test bottom rams to 250 psi/5,000
psi. Install wear bushing.
Pressure test completed successfully - 5000.000 psi
Move rig
Rigged up Fluid system
Finish rigging up, berming, ect.
Rigged up Fluid system
Take on mud, berm around #3 pump, set cutting box,
install herculite under rig floor, clean up around
·
lug.
Move rig (cont...)
Rigged up Fluid system (cont...)
Take on mud, berm around #3 pump, set cutting box,
install herculite under rig floor, clean up around
rig.
Equipment work completed
4in. Drillpipe workstring run
Ran Drillpipe to 2880.0 ft (4in OD)
Make up EZSV-BP and setting.RIH to 2,880'.
Facility
Date/Time
12 Oct 98
West Beach
12:00
12:00-12:30
12:30
12:30-13:00
13:00
13:00-14:00
13:00-14:00
14:00
14:00-06:00
14:00-15:30
15:30
15:30-16:00
16:00
16:00-17:00
17:00
17:00-20:00
20:00
20:00-22:30
22:30
22:30-23:00
23:00
23:00-02:00
02:00
02:00-05:00
05:00
05:00-05:45
05:45
05:45-06:00
Progress Report
Well WB-05B Page 3
Rig POOL 7 Date 11 August 99
Duration
1/2 hr
1/2 hr
1 hr
1 hr
16 hr
1-1/2 hr
1/2 hr
1 hr
3 hr
2-1/2 hr
1/2 hr
3 hr
3 hr
3/4 hr
1/4 hr
Activity
Stopped: To circulate
Held safety meeting
Held pre spud operations, saftey, environmental
meeting.
Completed operations
Circulated at 2880.0 ft
Displace 100 bbls freeze protect diesel out of 7"
csg.
Hole displaced with Fresh water - 100.00 % displaced
Repair
Repaired Iron roughneck
Repair iron roughneck.
Equipment work completed
4in. Drillpipe workstring run
Ran Drillpipe in stands to 6790.0 ft
Finish RIH with EZSV-BP
On bottom
Set packer at 6790.0 ft with 0.0 psi
Stacked 25K on bridge plug.
Packer set at 6790.0 ft
Circulated at 6780.0 ft
RU to circ. PJSM. Displace hole with 9.0 ppg LSND
mud.
Hole displaced with Water based mud - 100.00 % displaced
Pumped out of hole to 0.0 ft
PJSM - POOH LD setting tool. D1 drill @ 1700 hrs -
2 min.
Stopped: To pick up/lay out tubulars
Ran Drillpipe to 6790.0 ft (4-1/2in OD)
Make up casing cutter and stablizer o RIH - tagged
bridge plug @ 6,790'.
Completed run with Casing cutter to 6790.0 ft
Space out tubulars
Spot knives @ 6,780'. Attempt to cut csg.
Completed operations
Circulated at 6760.0 ft
Circ bottoms up. Observe well. Bled off 150 psi of
9 5/8" csg. Pulled up to 6,700' and shut in well.
Attempt to break circulation down 7" csg.
Pressured up to 2,000 psi. Held. Unable to get
back down with casing cutter.
Casing cutter failed - Abort operation
Casing not cut.
Pulled out of hole to 0.0 fl
Pull out of hole with csg cutter. Good wear on
knives.
Stopped: To test equipment : ,~:: ~ ~!~
Circulated at 0.0 ft
Shut blind rams. Attempt to circ down 7" casing.
Pressured up to 3,000 psi two times. Held for 15 min.
No leak-off.
Stopped: To pick up/lay out tubulars
Casing not cut.
Ran Drillpipe in stands to 100.0 ft
Facility
Date/Time
13 Oct 98
Progress Report
West Beach
Well WB-05B Page 4
Rig POOL 7 Date 11 August 99
05:45-06:00
06:00~03:00
06:00-08:00
08:00
08:00-10:00
10:00
10:00-13:00
13:00
13:00-15:00
15:00
15:00-17:30
17:30
17:30-18:00
18:00
18:00-22:00
22:00
22:00-00:00
00:00
00:00-00:30
00:30
00:30-03:00
03:00
03:00-06:00
03:00-03:30
03:30
03:30-04:30
04:30
04:30-05:15
Duration
1/4 hr
21hr
2 hr
2 hr
3 hr
2 hr
2-1/2 hr
1/2 hr
4 hr
2 hr
1/2 hr
2-1/2 hr
3 hr
1/2 hr
1 hr
3/4hr
Activity to cut casing.
Ran Drillpipe in stands to 100.0 ft
RIH w/multi-string casing cutter. Cutter opened
up and hung up in casing.
SPILL DRILL @ 0800 HRS, 2-1/2 MINS
4in. Drillpipe workstring run (cont...)
Ran Drillpipe in stands to 3374.0 ft (cont...)
RIH w/multi-string casing cutter. Cutter opened
up and hung up in casing.
SPILL DRILL @ 0800 HRS, 2-1/2 MINS
Observed 30.00 klb resistance
Pulled out of hole to 0.0 ft
POOH, inspect cutters, two tips broken
Stopped · To service drilling equipment
Serviced Casing cutter
Install new (longer cutters), Rebuild piston &
seal. Function test cutters at surface.
Equipment work completed
Ran Drillpipe in stands to 6760.0 ft
At Kick off depth · 6760.0 ft
Stopped to cut casing.
Functioned Casing cutter
Cut casing @ 6760'
Equipment work completed
Circulated at 6760.0 ft
Obtained bottoms up (100% annulus volume)
Circulated at 6760.0 ft
Pump down the 7" X 9-5/8" annulus to break down
the blockage and establish circulation. Switch back
& forth pumping down the DP & inside annulus and
then the outside annulus until establishing good
communication.
Broke circulation
Circulated at 6760.0 ft
Work rate up from 2 bpm / 2300 psi, to 7 bpm /
1000 psi. Circulate 1-1/2 full circulations.
Discard diesel freeze protection and old clabbered mud
Hole displaced with Water based mud - 100.00 % displaced
Serviced High pressure lines
Blow down Kill line. Blow down & rig down line f/
pump to outside annulus. Pump dry job.
Equipment work completed
Pulled out of hole to 0.0 ft
POOH, Lay down casing cutter
D1 DRILL @ 0230 HRS, 2 MINS
At Surface · 0.0 ft
Wellhead work
Retrieved Emergency seal assembly
Pull wear bushing. Pull 7" Casing Packoff
Equipment work completed
Rigged up Casing handling equipment
PFU and M/U 7" Casing spear. Stab into casing at
hanger. Pickup 50K over to ensure grappel set.
Equipment work completed
Retrieved Casing hanger
Facility
Date/Time
14 Oct 98
Progress Report
West Beach
Well WB-05B Page 5
Rig POOL 7 Date 11 August 99
05'15
05:15-06:00
06:00-07:00
06:00-07:00
07:00
07:00-18:00
07:00-08:30
08:30
08:30-11:00
11:00
11:00-17:30
17:30
17:30-18:00
18:00
18:00
18:00-19:00
18:00-19:00
19:00
19:00-06:00
19:00-23:00
23:00
23:00-06:00
06:00-07:30
06:00-07:30
07:30
07:30-08:00
07:30-08:00
08:00
08:00-12:30
08:00-10:30
10:30
Duration
3/4 hr
1 hr
1 hr
llhr
1-1/2 hr
2-1/2 hr
6-1/2 hr
1/2 hr
1 hr
1 hr
llhr
4 hr
7 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
2-1/2hr
Activity P/U BOP stack. Put eye bolts into Emergency slips
Equipment work completed
Rigged up Casing head
Set stack back in place. M/U Tubing / Casing head.
M/U lines & hoses to BOP stack.
Wellhead work (cont...)
Rigged up Tubing head spool
M/U Tubing head and BOP stack
Equipment work completed
Pull Casing, 7in O.D.
Worked stuck pipe at 6760.0 ft
Circulate and work casing until free.
Pipe came free
Rigged up Casing handling equipment
Pull casing to rig floor. R/U to lay down casing.
Remove spear from string. Backout and lay down
dutchman. Break down and lay down spear.
Equipment work completed
Laid down 6760.0 ft of Casing
190K initial pickup wt.
156 joints laid out
Rigged down Casing handling equipment
Equipment work completed
Equipment work completed
Wellhead work
Tested Casing head
P/U and set test plug. Test Casing headFFubing
head flange to 250/5000 psi. Install wear bushing
Pressure test completed successfully - 5000.000 psi
BHA run no. 1
Made up BHA no. 1
M/U milling assembly to open casing hanger and 47#
pup to 8.8".
Milling Assy - 8-1/2 NR stab, 6-1/2 DC, 8-1/2 NR
stab, 6-1/2 DC, XO, 8.8" mill, XO, XO, 2-8" DCs,
XO
BHA no. 1 made up
Milled Hanger assembly at 41.5 ft
Mill on 9-5/8" casing hanger. 80 rpm, 7-8000 tq,
285 gpm. Slow going, have made about 1-1/2 ft
FIRE DRILL @ 23:30 HRS, 3 MINS
BHA run no. 1 (cont...)
Milled Hanger assembly at 41.5 ft
PJSM
Mill on 9-5/8 hanger & pup jt
Washpipe failed - Change operation
Repair
Repaired Swivel
C/O Swivel packing
Equipment work completed
BHA run no. 1
Milled Casing hanger at 41.5 ft
Milled open casing hanger & pup to 8.80"
FIRE DRILL @ 0930 HRS, 3 MINS
Completed dressing Casing hanger
Mill still in guagc after milling.
Facility
West Beach
Progress Report
Well WB-05B Page 6
Rig POOL 7 Date 11 August 99
Date/Time
Duration
Activity
15 Oct 98
10:30-12:30
12:30
12:30-02:30
12:30-13:00
13:00
13:00-15:30
15:30
15:30-19:00
19:00
19:00-21:00
21:00
21:00-22:00
22:00
22:00-00:30
00:30
00:30-02:30
02:30
02:30-06:00
02:30-04:00
04:00
04:00-05:30
05:30
05:30-06:00
06:00-07:30
06:00-07:30
07:30
07:30-08:30
07:30-08:00
08:00
08:00-08:30
08:30
08:30-13:30
08:30-09:30
09:30
09:30-10:30
2 hr
14 hr
1/2 hr
2-1/2 hr
3-1/2 hr
2 hr
1 hr
2-1/2 hr
2 hr
3-1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1 hr
1/2 hr
1/2 hr
5 hr
1 hr
lhr
Pulled BHA
BHA Laid out
BHA run no. 2
Rigged up Top drive pipe handler
Change saver sub to handle 4" HT38
Equipment work completed
Made up BHA no. 2
MFLI milling assembly to open float collar to 8.77"
BHA no. 2 made up
R.I.H. to 6602.0 ft
RIH slow because of possible junk/fill. Didn't see
much eccessive drag.
At Float collar: 6602.0 ft
Milled Float collar at 6602.0 ft
Milled Float collar open to 8.77". Wash and ream
to 7' outside of shoe to 6648'
At 9-5/8in casing shoe
Circulated at 6630.0 ft
H2S DRILL @ 2130 HRS, 3 MINS
Obtained clean returns - 125.00 % hole volume
Pulled out of hole to 419.0 ft
Pump dry job, Monitor well, POOH
At BHA
Pulled BHA
BHA Laid out
3-1/2in. Cement stinger workstring run
Singled in drill pipe to 795.0 ft
Clean floor. Rig up 3-1/2 handling tools. PJSM.
P/U 25 jts of 3-1/2 DP stinger.
25 joints picked up
Ran Drillpipe in stands to 6760.0 ft
Run in to cut off stub.
At Setting depth: 6760.0 ft
Circulated at 6760.0 ft
3-1/2in. Cement stinger workstring run (cont...)
Circulated at 6760.0 ft
Obtained req. fluid properties - 200.00 %, hole vol.
·
· Cement · Kickoff plug
Batch mixed slurry - 40.000 bbl
R/U TIW valve & head pin, Hold PJSM w/cementers &
rig crews.
Batch slurry mixed
Displaced slurry - 58.000 bbl
Pump 5 bbls water, Test lines to 3000 psi, Pump 29
bbls water spacer, 40 bbls of 17.0 ppg class G
cement, 6 bbls water spacer, Displace w/rig to
balance. CIP @ 08:35 hrs
Slurry at required depth, stopped the displacement
3-1/2in. Cement stinger workstring run
Pulled Drillpipe in stands to 5981.0 ft
Set out single, head pin & TIW valve. Pull 10 stds.
Began precautionary measures
Circulated at 5981.0 ft
Facility
Date/Time
16 Oct 98
West Beach
10:30
10:30-12:00
12:00
12:00-13:30
13:30
13:30-19:00
13:30-15:30
15:30
15:30-19:00
19:00
19:00-00:30
19:00-20:00
20:00
20:00-00:30
00:30
00:30-06:00
00:30-03:00
03:00
03:00-03:30
03:30
03:30-04:00
04:00
04:00-06:00
06:00-11:30
06:00-10:00
10:00
10:00-11:00
11:00
11:00-11:30
11:30
11:30-14:00
11:30-14:00
14:00
Progress Report
Well WB-05B Page 7
Rig POOL 7 Date 11 August 99
Duration
1-1/2 hr
1-1/2 hr
5-1/2 hr
2 hr
3-1/2 hr
5-1/2 hr
1 hr
4-1/2 hr
5-1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
2 hr
5-1/2 hr
4 hr
1 hr
1/2 hr
2-1/2 hr
2-1/2 hr
Activity
Obtained clean returns - 125.00 % hole volume
Pump dry job.
Pulled out of hole to 795.0 ft
Stopped: To pick up/lay out tubulars
Laid down 795.0 ft of Drillpipe
Change to 3-1/2 handling tools, L/D stinger
25 joints laid out
Test well control equipment
Installed Well control
Change top rams to 5-1/2% C/O Top Drive saver
sub, P/U test jr & test plug, R/U to test.
Equipment work completed
Tested Well control
Test Hydril to 300/3500. Test rams, HCR & manual
Choke & Kill line valves, Choke manifold, floor
valves & Top Drive valves to 300/5000 psi.
Pressure test completed successfully - 5000.000 psi
Witnessing of BOP test waived by state man Jerry
Wade.
Derrick management
Installed Drillstring handling equipment
Blow down TD, Kill & choke lines and choke
manifold. Change bails, R/U to P/U 5-1/2 DP
Equipment work completed
Hold PJSM
Racked back drill pipe
102 joints picked up
BHA run no. 1
Made up BHA no. 1
P/U bit, motor, LDC, CDR/MWD, 2 string stabs,
3-DCs, Jars & accelerators, 5 jts Hwt DP
BHA no. 1 made up
Tested M.W.D. tool - Via string
Function test completed satisfactorily
Serviced Top drive
Equipment work completed
Singled in drill pipe to 2320.0 ft
BHA run no. 1 (cont...)
Singled in drill pipe to 5600.0 ft
SPILL DRILL @ 07:00 HRS, 2-1/2 MINS
165 joints picked up
Serviced Block line
Line slipped and cut
R.I.H. to 6186.0 ft
Tag cement
Observed 20.00 klb resistance
Perform integrity test
Tested Casing
R/U and test 9-5/8" surface casing to 3300 psi.
Had to test twice. After holding the first test 15
mins the washpipe packing on the Top drive started
leaking. R/U head pin and retested while changing
out packing.
Pressure test completed successfully - 3300.000 psi
Facility
Date/Time
17 Oct 98
18 Oct 98
19 Oct 98
Progress Report
West Beach
Well WB-05B
Rig POOL 7
Page 8
Date 11 August 99
14:00-06:00
14:00-20:00
20:00
20:00-06:00
06:00-07:00
06:00-07:00
07:00
07:00-08:00
07:00-08:00
08:00
08:00-06:00
08:00-06:00
06:00-06:00
06:00-07:30
07:30
07:30-09:30
09:30
09:30-10:30
10:30
10:30-11:00
11:00
11:00-11:30
11:30
11:30-06:00
06:00-06:00
06:00-11:30
11:30
11:30-12:30
12:30
12:30-06:00
Duration
16hr
6 hr
10hr
1 hr
1 hr
1 hr
1 hr
22 hr
22 hr
24 hr
1-1/2 hr
2 hr
1 hr
1/2 hr
1/2 hr
18-1/2 hr
24 hr
5-1/2 hr
1 hr
17-1/2 hr
Activity
BHA run no. 1
Drilled cement to 6640.0 ft
Cement stringers to 6225', about 60' higher than
"% expected.
~'-,1 At Kick off depth ' 6640.0 ft Drilled to 6699.0 ft
Time drill to kick off plug. AST= 9-3/4 hrs
SPILL DRILL @ 23:30 HRS, 2 MINS
BHA run no. 1 (cont...)
Drilled to 6705.0 ft
Time drill kicking off cement plug.
ART= 0 hrs, AST= 1 hr
Stopped · To perform FIT
Perform integrity test
Performed formation integrity test
Set std. back, pull into csg. Perform L.O.T.
Obtained leak off 13.6 ppg EMW
BHA run no. 1
Drilled to 8285.0 ft
ART= 11-1/4 hrs, AST=6-1/4 hrs
D2 DRILL @ 1600 HRS, 3 MINs
D2 DRILL @ 1930 HRS, 2-1/2 MINS
BHA run no. 1 (cont...)
Drilled to 8378.0 ft PTSM
ART-- 3/4 hr, AST= 3/4 hr
Started scheduled wiper trip: due to Footage drilled
Circulated at 8378.0 ft
Set a std back every 15 mins.
Obtained clean returns - 200.00 % hole volume
Monitor well, Pump dry job.
Pulled out of hole to 6585.0 ft
Short trip 19 stds to the shoe.
At 9-5/8in casing shoe
Serviced Top drive
Equipment work completed
R.I.H. to 8378.0 ft
D1 DRILL @ 11:30 HRS, 3 MINS
On bottom
Drilled to 9453.0 ft
ART= 10 hrs, AST= 5-1/4 hrs
FIRE DRILL @ 23:00 HRS, 2-1/2 MINS
BHA run no. 1 (cont...)
Drilled to 9784.0 ft
ART-- 3 hrs, AST= 1-1/2 hrs
Stopped · To circulate
Circulated at 9784.0 ft
Circulate weighted / Barofibre sweep out of hole.
Hole swept with slug - 175.00 % hole volume
Hole unloaded some but it didn't help tq & drag.
Drilled to 10535.0 ft
ART-- 7-3/4 hrs, AST= 7 hrs
SPILL DRILL @ 17:00 HRS, 3-1/2 MINS
D2 DRILL @ 23:20 HRS, 3 MINS
Addcd ~:'-- pt ___,T._:, ,~ -,,, ^'-'- to ~:'~ w/
Facility
Date/Time
20 Oct 98
21 Oct 98
22 Oct 98
23 Oct 98
Progress Report
West Beach
Well WB-05B Page 9
Rig POOL 7 Date 11 August 99
06:00-06:00
06:00-12:00
12:00
12:00-13:00
13:00
13:00-14:30
14:30
14:30-15:00
15:00
15:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-08:30
08:30
08:30-11:00
11:00
11:00-14:30
14:30
14:30-16:00
16:00
16:00-18:30
18:30
18:30-20:30
20:30
20:30-06:00
06:00-06:00
06:00-14:00
Duration
24 hr
6 hr
1 hr
1-1/2 hr
1/2 hr
15hr
24 hr
24 hr
24 hr
2-1/2 hr
2-1/2 hr
3-1/2 hr
1-1/2 hr
2-1/2 hr
2 hr
9-1/2 hr
24 hr
8 hr
Activity ease after it had circulated around a couple of
BHA run no. 1 (cont...)
Drilled to 10722.0 ft
ART= 1-1/2 hrs, AST= 4 hrs
D2 DRILL @ 09:30 HRS, 2-1/2 MINS
Started scheduled wiper trip: due to Footage drilled
Circulated at 10722.0 ft
Set a std. back every 15 mins.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 8285.0 ft
Pump dry job. monitor well. Short trip 26 stds to
last short trip interval.
At top of check trip interval
R.I.H. to 10722.0 ft
On bottom
Drilled to 11378.0 ft
ART= 5-1/2 hrs, AST= 7-1/4 hrs
SPILL DRILL @ 21:30 HRS, 2-1/2 MINS
BHA run no. 1 (cont...)
Drilled to 12601.0 ft
ART= 14-3/4 hrs, AST= 5 hrs
FIRE DRILL @ 1700 HRS, 2-1/2 MINS
D2 DRILL @ 2000 HRS, 2-1/2 MINS
BHA run no. 1 (cont...)
Drilled to 12788.0 ft
ART= 2 hrs, AST= 0 hrs
Stopped · To circulate
Circulated at 12788.0 ft
Circ hole clean for mud change over. Set a std back
every 1/2 hr.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 8000.0 ft
Pump dry job. Pull 50 std short trip. Clean pits to
take on KCL/Gem mud.
At top of check trip interval
R.I.H. to 12788.0 ft
On bottom
Circulated at 12788.0 ft
PJSM with rig crews & truck drivers. Pump 60 bbl
low visc sweep, 50 bbl high visc sweep, Displace to
KCL/Gem mud.
Hole displaced with Water based mud - 100.00 % displaced
Before - P/U wt 365K, S/O wt 200K, Rot wt 240K
Tq 24500 R/lbs.
After - PFO wt 300K, S/O wt 225K, Rot wt 240K
Tq 14000 ft/lbs.
Serviced Fluid system
Clean under shakers & troughs, sand trap and
suction pits. Fill pits with mud.
Equipment work completed
Drilled to 13165.0 ft
ART= 4 hrs, AST= 4 hrs
FIRE DRILL @ 2300 HRS, 2 MINS
BHA run no. 1 (cont...)
Drilled to 13395.0 ft
PJ .... ~~.~'~ ,~s --':'~,~,, .... corning ......
Facility
Date/Time
24 Oct 98
Progress Report
West Beach
Well WB-05B Page 10
Rig POOL 7 Date 11 August 99
14:00
14:00-14:45
14:45
14:45-19:30
19:30
19:30-20:30
20:30
20:30-21:30
21:30
21:30-23:30
23:30
23:30-01:00
01:00
01:00-01:30
01:30
01:30-04:00
04:00
04:00-06:00
06:00-15:00
06:00-08:30
08:30
08:30-09:00
09:00
09:00-10:00
10:00
10:00-11:00
11:00
11:00-13:30
13:30
13:30-15:00
15:00
Duration
3/4 hr
4-3/4 hr
1 hr
1 hr
2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
2hr
9 hr
2-1/2 hr
1/2 hr
1 hr
1 hr
2-1/2 hr
1-1/2 hr
Activity ART= 2 hrs, AST= 5 hrs
Began precautionary measures
Circulated at 13395.0 ft
Circulate up samples to help correlate depth.
Obtained bottoms up (100% annulus volume)
Drilled to 13770.0 ft
ART-- 3-1/2 hrs, AST= 0 hrs
PTSM @ 15:00 hrs with crew coming on tower.
D2 DRILL @ 16:00 HRS, 2-1/2 MINS
Stopped: To circulate
Circulated at 13770.0 ft
Circulate sample up to correlate.
Obtained bottoms up (100% annulus volume)
Drilled to 13852.0 ft
ART= 3/4 hrs, AST= 0 hrs
Reached planned end of run - Section / well T.D.
Circulated at 13852.0 ft
Circulate sample up. At casing point.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 12414.0 ft
Monitor well, Pump dry job, Blow down Top drive.
Pull 16 std short trip.
At top of check trip interval
R.I.H. to 13852.0 ft
On bottom
Hole in good condition both ways.
Circulated at 13852.0 ft
Pump Barofibre sweep around. Circulate hole clean.
Set back a std every 1/2 hr.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 11650.0 ft
Monitor well, Pump dry job, Blow down Top drive,
POOH to run 7" casing
BHA run no. 1 (cont...)
Pulled out of hole to 7632.0 ft
Had 25K overpull, worked pipe up. to 7259'.
Continued drag from 10K to 25K over.
Cuttings beds
Observed 25.00 klb overpull
R.I.H. to 7914.0 ft
Began precautionary measures
Circulated at 7914.0 ft
Circ 670 gpm, 110 rpm,
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 6848.0 ft
Observed 65.00 klb overpull
Hit a bridge 2 stds from the shoe
Backreamed to 6610.0 ft
Backreamed slowly through coal beds from 6848' to
6770'. Then pumped & reamed into the casing shoe.
Began precautionary measures
Circulated at 6610.0 ft
Circulate with 604 gpm, 125 rpm,
Obtained clean returns - 300.00 % hole volume
Lots of coal across shakers.
Facility
Date/Time
25 Oct 98
Progress Report
West Beach
Well WB-05B Page 11
Rig POOL 7 Date 11 August 99
15:00-15:30
15:00-15:30
15:30
15:30-23:00
15:30-16:00
16:00
16:00-16:30
16:30
16:30-20:00
20:00
20:00-23:00
23:00
23:00-06:00
23:00-02:00
02:00
02:00-06:00
06:00-16:00
06:00-11:00
11:00
11:00-11:30
11:30
11:30-14:00
14:00
14:00-16:00
16:00
16:00-16:30
16:00-16:30
16:30
16:30-06:00
16:30-18:00
18:00
18:00-20:00
Duration
1/2 hr
1/2 hr
7-1/2 hr
1/2 hr
1/2 hr
3-1/2 hr
3 hr
7 hr
3 hr
4 hr
10hr
5 hr
1/2 hr
2-1/2 hr
2 hr
1/2 hr
1/2 hr
13-1/2 hr
1-1/2 hr
2 hr
Activity
Repair
Repaired Top drive
Top Drive IBOP valve operating mechanism not
functioning properly.
Equipment work completed
BHA run no. 1
R.I.H. to 7153.0 ft
Run 6 stds in the hole to make sure it had been
cleaned up properly
Began precautionary measures
Pulled out of hole to 6610.0 ft
At 9-5/8in casing shoe
Hole looked good both ways.
Pulled out of hole to 417.0 ft
Pump dry job, Blow down Top drive, POOH
D1 DRILL @ 16:45 HRS, 2-3/4 MINS
At BHA
Pulled BHA
L/D hwt DP, Jars, Accelerators, XOs, DCs, Stabs,
MWD, CDR, Motor & Bit
BHA Laid out
FIRE DRILL @ 23:00 HRS, 2-1/2 MINS
Run Casing, 7in O.D.
Rigged up Casing handling equipment
Pull wear bushing, RJU "Franks" circulating head,
Tongs, Elevators, Spyders
Equipment work completed
Ran Casing to 2800.0 ft (7in OD)
Hold Pre job safety meeting. P/U floatjts &
circulate. Run csg.
Daylight savings time change.
Run Casing, 7in O.D. (cont...)
Ran Casing to 6610.0 ft (7in OD)
At 9-5/8in casing shoe
Circulated at 6610.0 ft
9.3 bpm / 1400 psi
Obtained bottoms up (100% annulus volume)
Ran Casing to 9000.0 ft (7in OD)
Began precautionary measures
Circulated at 9000.0 ft
Circulate dehydrated heavy mud (10.7 ppg) out of
hole. 8.5 bpm, 1450 psi, FCP= 1325 psi
Obtained bottoms up (100% annulus volume)
Repair
Repaired Casing handling equipment
Repair casing tongs
Equipment work completed
Run Casing, 7in O.D.
Ran Casing to 11400.0 ft (7in OD)
Began precautionary measures
Circulated at 11400.0 ft
Circulating at 8-1/2 bpm, 1625 psi, Had pumped 390
bbls when the hole pscked off and we lost
circulation. Started pumping slowly, finished
Facility West Beach
Date/Time Duration
20:00
20:00-21:30 1-1/2 hr
21:30
21:30-22:00 1/2 hr
22:00
22:00-23:30 1-1/2 hr
23:30
23:30-06:00 6-1/2 hr
26 Oct 98 06:00-00:00 18 hr
06:00-19:00 13 hr
19:00
19:00-20:30 1-1/2 hr
20:30
20:30-00:00
3-1/2 hr
27 Oct 98 00:00
00:00-02:00 2 hr
00:00-00:45 3/4 hr
00:45
00:45-02:00 1-1/4 hr
02:00
02:00-04:30 2-1/2 hr
02:00-04:30 2-1/2 hr
04:30
04:30-06:00 1-1/2 hr
Progress Report
Well WB-05B Page 12
Rig POOL 7 Date 11 August 99
Activity Lost total of 50 bbls
Obtained bottoms up (100% annulus volume)
Ran Casing to 12600.0 ft (7in OD)
Began precautionary measures
Circulated at 12600.0 ft
Circulated 1300 stks. Pipe stuck.
Stop circulating, Free pipe.
Began precautionary measures
Ran Casing to 13802.0 ft (7in OD)
Worked tight pipe in hole to 50' above TD where we
we couldn't go any further..
Got stuck whilst pipe moving
Circulated at 13802.0 ft
Circulate at 1-1/2 to 3 bpm, hole packing off. (700
to 1100 psi) 11.0 ppg mud back at btms up.
Condition dehydrated heavy mud. Work rate up as
allowed. Pumping 10.2 ppg mud down hole.
Work casing.
Run Casing, 7in O.D. (cont...)
Washed to 13812.0 ft
Circ,wash, and spud 7" csg to 13,812'. Hole
packing off - Work pump rate up to 8.5 BPM - cut mud wt.
to 10.1 ppg. Hole taking +/- 20 BPH mud.
Observed 100.00 klb resistance
Unable to work csg deeper than 13,812' by csg
talley.
Laid down 40.0 ft of Casing
Space out for cemnt job - LD one jr. 7" csg and
picked up 10' x 7" pup - make up cementing
head. Hose gone off fill up tool - 9' x 4 3/4" OD.
( hose assembly should be on float collar).
Completed operations
Spill drill @ 1900 hrs - 3 min.
Circulated at 13812.0 ft
Circ / recipicate w/7" csg shoe @ 13,812' - no
restriction from csg fill up hose. PJSM. Batch up
tail slurry.
String displaced with Water based mud - 100.00 % displaced
Cement: Casing cement
Mixed and pumped slurry - 220.000 bbl
Test lines to 3,500 psi. Set and cemented 7" csg @
13,812' ( 40' off bottom). Howco pumped 30 bbls
water, 40 bbls 10.1 ppg Alpha spacer, 171 bbls class
"G" lite @ 11.0 ppg and 49 bbls class "G" @ 15.8 ppg
- Recipicated pipe.
Tail cement pumped
Displaced slurry - 526.000 bbl
Displaced w/mud at 8.0 BPM. Plug did not bump.
Floats held. Cement in place at 0200 hrs.
String displaced with Water based mud - 100.00 % displaced
Nipple down BOP stack
Removed BOP stack
Observe well - static. LD cementing head. PU BOP's.
Equipment work completed
Wellhead work
Facility
Date/Time
28 Oct 98
Progress Report
West Beach
Well WB-05B Page 13
Rig POOL 7 Date 11 August 99
04:30-06:00
04:30-06:00
06:00-09:30
06:00-09:30
09:30
09:30-12:00
09:30-12:00
12:00
12:00-14:30
12:00-14:30
14:30
14:30-22:00
14:30-16:30
16:30
16:30-22:00
22:00
22:00-23:00
22:00-23:00
23:00
23:00-00:00
23:00-00:00
00:00
00:00-01:00
00:00-01:00
Duration
1-1/2 hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
7-1/2 hr
2 hr
5-1/2 hr
1 hr
1 hr
I hr
1 hr
1 hr
1 hr
Activity
Installed Emergency hang off assembly
Set slips - landing 7" csg with 220K on slips. Cut
off 7" csg.
Installed Emergency hang off assembly
PJSM - Cut off 7" csg. LD landing JT. Make final
cut/dress / install 7" pack-off. RILDS. NU tbg head
and BOPS. Test Pack-off to 3,750 psi for 10 min.
Held.
Wellhead work (cont...)
Installed Emergency hang off assembly (cont...)
PJSM - Cut off 7" csg. LD landing JT. Make final
cut/dress / install 7" pack-off. RILDS. NU tbg head
and BOPS. Test Pack-off to 3,750 psi for 10 min.
Held.
Equipment work completed
Fluid system
Freeze protect well - 65.000 bbl of Diesel
RU to pump freeze protection diesel down 7"
annulus- 11 hrs total time on cement. Pumped 120
bbls water and 65 bbls diesel - final rate 2 BPM @
1375 psi. Freeze protected 9 5/8" x 7" annulus to
2320'.
Completed operations
BOP/riser operations - Top ram
Installed BOP stack
Change top and bottom rams to 4".
Equipment work completed
Test well control equipment
Installed BOP test plug assembly
RU to test BOP's - start testing choke manifold.
Diesel leaking out NSCC threads on 9 5/8" rutted
hanger after pumping freeze protection diesel - 600
psi SICP.
Began precautionary measures
Tested BOP stack
Changed out 4" test joint. Test BOP's as per SSD
policy to 250 psi low and 5,000 psi high. Hydril
to 3,500 psi. Test witness waived by Chuck Scheve
w/AOGCC. Fire drill @ 2030 hrs - 2.5 min.
Rig equipment failed - Change operation
Repair
Repaired High pressure lines
Repair test pump.
Equipment work completed
Test well control equipment
Tested BOP stack
Finished test BOP's. Accumulator drill @ 2300 hrs.
Pulled test plug.
Pressure test completed successfully - 5000.000 psi
Wellhead work
Circulated at 6630.0 ft
Pump 220 bbls 10.1 ppg brine down 9 5/8" x 7"
annulus @ 6.1 BPM. ISICP - 590 psi, 1 hr SICP 150 psi, 2
hr SICP 50 psi, and 3 hr SICP 0 psi. No visable
leak ~ surface.
Facility West Beach
Date/Time
01:00
O1:00-02:00
O1:00-02:00
02:00
02:00-06:00
02:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00-17:30
06:00-17:30
17:30
17:30-00:30
17:30-20:00
20:00
20:00-21:30
21:30
21:30-00:30
29 Oct 98 00:30
00:30-06:00
00:30-03:30
03:30
03:30-05:00
05:00
05:00-05:30
05:30
05:30-06:00
Progress Report
Well WB-05B Page 14
Rig POOL 7 Date 11 August 99
Duration
Activity
1 hr
1 hr
4 hr
1 hr
3 hr
3 hr
11-1/2 hr
11-1/2 hr
7 hr
2-1/2 hr
1-1/2 hr
3 hr
5-1/2 hr
3 hr
1-1/2 hr
1/2 hr
1/2 hr
Hole displaced with Brine - 120.00 % displaced
Perform integrity test
Tested Casing - Via string
Test 7" csg to 3,000 psi for 30 mi against blind
rams. Lost 150 psi. Good test.
Pressure test completed successfully - 2850.000 psi
Run Drillpipe, 5-1/2in O.D.
Rigged up Drillstring handling equipment
Blow down lines. RU to lay down 5 1/2" drill pipe
out of derrick.
Equipment work completed
Laid down 2500.0 ft of 5-1/2in OD drill pipe
LD 5 1/2" drill pipe out of derrick.
Laid down 2500.0 ft of 5-1/2in OD drill pipe
Lay down 5 1/2" drill pipe out of derrick in mouse
hole.
Run Drillpipe, 5-1/2in O.D. (cont...)
Laid down 13500.0 ft of 5-1/2in OD drill pipe (cont...)
Lay down 5 1/2" drill pipe out of derrick in mouse
hole.
428 joints laid out
Wellhead work
Removed Seal assembly running tool
Make up retrieving tool. PJSM. Back out lock down
screws. Pulled 7" pack-off. Make up spear w/6.220"
grapple.
Equipment work completed
Removed BOP stack
Speared 7" csg @ 39'. PU BOP's. Pulled 310K on 7"
csg and recovered slips. Slacked off- csg
squatted 7.8'. Released spear - Top of 7" csg @
46.80' (5' below 9 5/8" hanger), layed down
tools.
Equipment work completed
Installed BOP stack
NU BOP's. Set test plug in braden head, RU to test.
Test btm tbg head flange to 250 psi / 5,000 psi.
LD test plug. Spill drill @ 2130 hrs - 3 min.
Equipment work completed
Run Drill collar, 4-3/4in O.D.
Ran Drill collar to 810.0 ft (4-3/4in OD)
PU 15 - 4 3/4" OD DC's (18K) and RIH w/4" DP to
810'
Completed run with Drill collar to 810.0 ft
Circulated at 810.0 ft
Displace 7" csg with diesel - pumped 50 bbls water
and 36 bbls diesel.
Hole displaced with Diesel - 100.00 % displaced
Pulled Drillpipe in stands to 453.0 ft
Stand back 4" DP.
Completed operations
Ran Drill collar to 500.0 ft (4-3/4in OD)
Make up Baker 7" hydraulic back off tool and pick
up 4.,tv" '~" ~,.~r'r" ~.
Facility
Date/Time
30 Oct 98
Progress Report
West Beach
Well WB-05B Page 15
Rig POOL 7 Date 11 August 99
Duration
Activity
05:30-06:00
06:00-05:00
06:00-10:00
10:00
10:00-11:30
11:30
11:30-14:00
14:00
14:00-16:30
16:30
16:30-18:00
18:00
18:00-21:00
21:00
21:00-21:30
21:30
21:30-22:00
22:00
22:00-23:00
23:00
23:00-02:00
02:00
02:00-03:00
03:00
03:00-05:00
1/2 hr
23 hr
4 hr
1-1/2 hr
2-1/2 hr
2-1/2 hr
1-1/2 hr
3 hr
1/2 hr
1/2 hr
1 hr
3 hr
1 hr
2 hr
Ran Drill collar to 500.0 ft (4-3/4in OD)
Finished RIH w/back-off tool picking up 4 3/4"
DC' s. Filled string with diesel. RU test pump to
circulating head and spaced out.
Run Drill collar, 4-3/4in O.D. (cont...)
Ran Drill collar to 500.0 ft (4-3/4in OD) (cont...)
Finished RIH w/back-off tool picking up 4 3/4"
DC' s. Filled string with diesel. RU test pump to
circulating head and spaced out.
On bottom
Functioned Casing cutter
Attemp to break 7" csg connection @ 377' w/Baker
hydralic back off tool. Unable to operate tool -
did not get connection broke. Fire drill @ 1100
hrs - 2.5 min.
Began precautionary measures
Pulled Drill collar in stands to 453.0 ft
POOH and lay down back-off tool.
Completed operations
Ran Drill collar to 377.0 ft (4-3/4in OD)
Repin anchors and make up back-off tool - RIH -
Fill string with diesel. RU test pump to circ
head. Spot tool across 7" connection @ 377'.
Completed run with Downhole tools to 377.0 ft
Functioned Casing cutter
Made break in 7" csg connection @ 377'. Backed out
jt#8 three rounds. Torque 12,500 fi/lbs - 3500
ft/lbs.
Equipment work completed
Pulled Drill collar in stands to 453.0 ft
PJSM. RD circ head POOH w/back off tool - LD same.
D1 drill @ 2130 hrs.
Completed operations
Ran Drillpipe to 933.0 ft (4in OD)
Began precautionary measures
Circulated at 933.0 ft
Circ diesel out of 7" csg w/10.2 ppg mud.
Hole displaced with Water based mud - 100.00 % displaced
Pulled Drill collar in stands to 0.0 ft
POOH.
Completed operations
Retrieved Casing
Make up 7" spear. Speared 7" csg @ 47'. Pulled 10K
over. Backed out 7" csg @ 377'.Pulled 7" pipe to
floor - released spear. Circ diesel out of 9 5/8" x
7" annulus.
Completed operations
Laid down 331.0 ft of Casing
PJSM. LD 8Jts and cut off piece 7" csg (331').
Recovered collar - pin looking up.
8 joints laid out
Installed Retrievable packer
RIH w/10- 4 3/4" DC's,and 9 5/8" storm packer. Set
Facility
Date/Time
31 Oct 98
Progress Report
West Beach
Well WB-05B Page 16
Rig POOL 7 Date 11 August 99
05:00
05:00-06:00
05:00-06:00
06:00-09:00
06:00-09:00
09:00
09:00-03:00
09:00-12:00
12:00
12:00-18:00
18:00
18:00-02:00
02:00
02:00-03:00
03:00
03:00-06:00
03:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-08:00
06:00-06:30
06:30
06:30-08:00
08:00
08:00-10:30
08:00-10:30
10:30
10:30-12:00
10:30-12:00
12:00
12:00-15:30
12:00-15:30
Duration
1 hr
1 hr
3 hr
3 hr
18hr
3 hr
6 hr
8 hr
1 hr
3 hr
2-1/2 hr
1/2 hr
1/2 hr
2 hr
1/2 hr
1-1/2 hr
2-1/2 hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
Activity psi.
Equipment work completed
Nipple down BOP stack
Removed BOP stack
Nipple down BOP' s.
Nipple down BOP stack (cont...)
Removed BOP stack (cont...)
Nipple down BOP's.
Equipment work completed
Wellhead work
Removed Casing head
Remove braden head. Tubescope ultrsonic inspected 9
5/8" nipple below hanger - wall thickness OK.
Inspected with penetrant dye for cracks - OK.
Equipment work completed
Welded casing stub
GBR welded 9 5/8" nipple to 9 5/8" hanger.
Completed operations
Welded casing stub
Insulated and allowweld to cool down.
Completed operations
Installed Casing head
NU new 11" 5M braden head - test seals to 1,000
psi. Held.
Equipment work completed
Nipple up BOP stack
Rigged up BOP stack
NU BOP's.
Equipment work completed
Tested Casing head
Test 9 5/8" csg hanger and braden head to 3,000 psi
with diesel.
Tested Casing head
Finish testing welded up 9 5/8" csg hanger and
braden head to 3,000 psi with diesel. Held.
Nipple up BOP stack (cont...)
Tested Casing head (cont...)
Finish testing welded up 9 5/8" csg hanger and
braden head to 3,000 psi with diesel. Held.
Pressure test completed successfully - 3000.000 psi
Rigged up BOP stack
Finished nippling up BOP's.
Equipment work completed
Wellhead work
Set Retrievable packer at 49.0 ft with 0.0 psi
Retrieved 9 5/8" storm packer @ 49'. Well on
vaccum. LD packer and 10 - 4 3/4" DC's.
Began precautionary measures
Test well control equipment
Tested BOP stack
Set test plug. Test all breaks in stack to 250 psi
low and 5,000 psi high. Pulled test plug.
Pressure test completed successfully - 5000.000 psi
Run Casing, 7in O.D.
Ran Casing to 377.0 ft (7in OD)
RU to i-un &" csg. ,,T ...... 8 -,,o ....... : .... screw
Progress Report
Facility West Beach
Well WB-05B Page 17
Rig POOL 7 Date 11 August 99
Date/Time
01 Nov 98
15:30
15:30-16:00
15:30-16:00
16:00
16:00-21:30
16:00-20:30
20:30
20:30-21:30
21:30
21:30-22:30
21:30-22:30
22:30
22:30-06:00
22:30-23:30
23:30
23:30-06:00
23:30-06:00
06:00-12:30
06:00-10:00
10:00
10:00-10:30
10:30
10:30-11:30
11:30
11:30-12:30
12:30
12:30-13:00
12:30-13:00
13:00
13:00-21:30
13:00-14:30
14:30
14:30-16:00
16:00
Duration
1/2 hr
1/2 hr
5-1/2 hr
4-1/2 hr
1 hr
1 hr
1 hr
7-1/2 hr
1 hr
6-1/2 hr
6-1/2 hr
6-1/2 hr
4 hr
1/2 hr
1 hr
1 hr
1/2 hr
1/2 hr
8-1/2 hr
1-1/2 hr
1-1/2 hr
Activity in sub and 10jts 7" 26g 180 ButtMod csg. Screw
Completed run with Casing to 377.0 ft
Perform integrity test
Tested Casing
Test 7" csg to 3,000 psi for 30 min. Held.
Pressure test completed successfully - 3000.000 psi
Wellhead work
Installed Emergency hang off assembly
PU BOP 's. Set slips and landed 7" csg with 220K
on slips. Break out and lay down landing jts. NU
BOP's.
Equipment work completed
Installed Slip & seal assembly
Install 7" pack-off and test to 3750 psi for 10
min. Held. Freeze protected 9 5/8" x 7" annulus w/
bbls diesel. Set 6 3/4" ID wear bushing.
Equipment work completed, seal energised
4-3/4in. Drillpipe workstring run
Laid down 420.0 ft of Drill collar
LD 4 3/4" OD DC's out of derrick.
14 joints laid out
BHA run no. 2
Made up BHA no. 2
Make up clean out BHA - 6" OD bit, 2 - junk
baskets, BS, 6 - 4 3/4" DC's, jars, 4" DP.
BHA no. 2 made up
Singled in drill pipe to 6000.0 ft
RIH picking up 4" drill pipe.
Singled in drill pipe to 6000.0 ft
PTSM. Finish picking up 4" DP - RIH to 13,000'.
BHA run no. 2 (cont...)
Singled in drill pipe to 6000.0 ft (cont...)
PTSM. Finish picking up 4" DP - RIH to 13,000'.
Began precautionary measures
Held drill (Kick (well kill))
SPR- D2 - followed by well kill drill.
Drill abandoned
R.I.H. to 13550.0 ft
RIH to 13,550' - washed down and tagged up 13,706'.
Observed loss of 7.00 klb string weight
Circulated at 13690.0 ft
Circ bottoms up.
Obtained bottoms up (100% annulus volume)
Perform integrity test
Tested Casing
Test 7" csg to 3,500 psi for 30 min. Held.
Pressure test completed successfully - 3500.000 psi ·
BHA run no. 2
Drilled cement to 13719.0 ft
Drlg top plug and cement f/13,706' - 13,719' w/
7-8K WOB. Would not drill off @ 13719'.
Completed operations .
Circulated at 13700.0 ft
Circ bottoms up - recovered plug rubbler.
Obtained bottoms up (100% annulus volume)
Facility
Date/Time
West Beach
16:00-21:00
21:00
21:00
21:00-21:30
Duration
5 hr
1/2 hr
21:30
21:30-06:00 8-1/2 hr
21:30-22:30 1 hr
22:30
22:30-23:30 1 hr
23:30
23:30-03:30 4 hr
02 Nov 98 03:30
03:30-06:00 2-1/2 hr
03:30-06:00 2-1/2 hr
06:00-14:30 8-1/2 hr
06:00-07:30 1-1/2 hr
07:30
07:30-12:30
12:30
12:30-13:30
5 hr
1 hr
13:30
13:30-14:30
14:30
14:30-06:00
14:30-15:30
1 hr
15-1/2 hr
1 hr
15:30
15:30-20:00
20:00
20:00-21:00
4-1/2 hr
1 hr
Progress Report
Well WB-05B Page 18
Rig POOL 7 Date 11 August 99
Activity
Pulled out of hole to 227.0 ft
POOH w/clean out BHA.
At BHA
At BHA
Pulled BHA
LD Bit, JB's, jars.
BHA Laid out
BHA run no. 3
Made up BHA no. 3
Make up BHA - 6 1/8" OD x 5 3/16" ID shoe, 3 WP
extensions,Junk basket, float, bumper sub, jars, DC's,
circ sub.
BHA no. 3 made up
Serviced Top drive
Top drive, draw works, brakes.
Equipment work completed
R.I.H. to 13719.0 ft
RIH w/shoe. D1 drill @ 2330 hrs - 3 min.
On bottom
Washed to 13723.0 ft
Wash over fish f/13,719' - 13,723'. Recovering
hose rubber over shakers. Raise mud wt to 10.5
PPg.
Washed to 13723.0 ft
Burn over fish to 13,725' (6"). No progress last
2.5 hours. Open circ sub. Spud shoe over fish w/
bumper sub.
BHA run no. 3 (cont...)
Washed to 13725.0 ft (cont...)
Burn over fish to 13,725' (6"). No progress last
2.5 hours. Open circ sub. Spud shoe over fish w/
bumper sub.
Began precautionary measures
No progress.
Pulled out of hole to 229.0 ft
Slug DP. POOH with Shoe. Spill drill @ 0800 hrs.
At BHA
Pulled BHA
Inspect shoe. O.D of crown on shoe wore out / split
- 5 3/16" OD fish had started up into shoe.
Recovered wire wrap from around rubber hose ( 4 lbs) and
piece hose clamp in junk basket.
BHA Stood back
Serviced Drillfloor / Derrick
Greased up - modify shoe.
Equipment work completed
BHA run no. 4
Made up BHA no. 4
6 1/8" x 5 3/16" shoe, extentions, 3 -junk
baskets, bumper sub, jars, ect.
BHA no. 4 made up
R.I.H. to 10000.0 ft
Stopped · To service drilling equipment
Serviced Block line
Cut '~-:':--
U1111111~ 1111~,.
Facility West Beach
Date/Time
21:00
21:00-22:00
22:00
22:00-02:00
03 Nov 98 02:00
02:00-06:00
06:00-08:00
06:00-06:30
06:30
06:30-08:00
08:00
08:00-22:30
08:00-08:30
08:30
08:30-12:00
12:00
12:00-12:30
12:30
12:30-17:00
17:00
17:00-22:00
22:00
22:00-22:30
22:30
22:30-04:30
22:30-04:30
04 Nov 98 04:30
04:30-06:00
Progress Report
Well WB-05B Page 19
Rig POOL 7 Date 11 August 99
Duration
Activity
1 hr
4 hr
4 hr
2 hr
1/2 hr
1-1/2 hr
14-1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
4-1/2 hr
5 hr
1/2 hr
6 hr
6 hr
1-1/2 hr
Line slipped and cut
R.I.H. to 13719.0 ft
Observed 5.00 klb resistance
Milled Other sub-surface equipment at 13725.0 ft
Wash over fish f/13,721' - 13,725'. Milled on fish
@ 13,725' for 3.5 hr. Made about 6 inches.
Recovered hose rubber over shakers. Slugged DP.
Began precautionary measures
Pulled out of hole to 2500.0 ft
PJSM. Finish POOH with shoe#2.
BHA run no. 4 (cont...)
Pulled out of hole to 2500.0 ft (cont...)
PJSM. Finish POOH with shoe#2.
At BHA
Pulled BHA
Pulled BHA. LD shoe. Recovered top hose end and
about half of hose. Good recover in junk baskets -
wire from hole. Shoe in good shape - had OD & ID
wear.
BHA Stood back
BHA run no. 5
Made up BHA no. 5
Make up BHA - Change shoe.
BHA no. 5 made up
R.I.H. to 13660.0 ft
On bottom
Washed to 13725.0 ft
Wash over fish from 13,722' -13725'. Torquing,
stalling table.
Completed precautionary measures
Milled Other sub-surface equipment at 13725.0 ft
Burn over fish @ 13,725'. Torquing, stalling table.
Worked mill for 4.5 hrs - no measureable progress.
Slug Dp.
Completed operations
Pulled out of hole to 237.0 ft
POOH w/shoe #3.
At BHA
Pulled BHA
Shoe wore out - OD,ID, bottom. Junk / fish had been
14 inches up insided wash pipe. Recovered some
hose wire in junk baskets.
BHA Stood back
Test well control equipment
Tested BOP stack
Test BOP's as per SSD policy to 250 psi high and
5,000 psi low. Tested hydril to 3,500 psi. One
leak - Blind flange on spacer spool - replace ring
gasket. Test witness waived by John Splading w/
AOGCC. Accumulator drill. Set wear ring.
Pressure test completed successfully - 5000.000 psi
Fire drill @ 2300 hrs - 3 min.
BHA run no. 5
Facility
Date/Time
West Beach
04:30-05:00
Duration
1/2 hr
05:00
05:00-06:00
06:00-20:00
06:00-08:00
08:00
08:00-08:30
08:30
08:30-10:00
10:00
10:00-15:00
1 hr
14hr
2 hr
1/2 hr
1-1/2 hr
5 hr
15:00
15:00-19:30
19:30
19:30-20:00
4-1/2 hr
1/2 hr
Progress Report
Well WB-05B Page 20
Rig POOL 7 Date 11 August 99
20:00
20:00-06:00
20:00-20:30
10hr
1/2 hr
20:30
20:30-21:00
21:00
21:00-01:30
05 Nov 98 01:30
01'30-04:00
1/2 hr
4-1/2 hr
2-1/2 hr
04:00
04:00-06:00
04:00-06:00
06:00-09:00
06:00-08:00
08:00
08:00-09:00
2 hr
2 hr
3 hr
2 hr
1 hr
Activity
Made up BHA no. 5
Milling assembly - 6 1/8" OD, flat bottom, bladed
mill, 4 - junk baskets, bumper sub, jars, 6 - 4 3/4"
DC's
BHA no. 5 made up
R.I.H. to 3000.0 ft
PTSM. RIH to 8,000'.
BHA run no. 5 (cont...)
R.I.H. to 3000.0 ft (cont...)
PTSM. RIH to 8,000'.
Stopped · To service drilling equipment
Serviced Top drive
Service top drive.
Equipment work completed
R.I.H. to 13700.0 ft
Washed down and tagged top offish @ 13,721.5'.
On bottom
Milled Other sub-surface equipment at 13723.0 ft
Mill on fish @ 13,723' for 5 hrs. No torque - ran
12K/100 RPM. Recovered small amount of hose rubber
over shaker. No progress last 4 hrs.
Completed operations
Pulled out of hole to 230.0 ft
POOH w/6 1/8" OD flat bottom mill.
At BHA
Pulled BHA
LD mill and emptied junk basket. Mill 50% wore out
on bottom w/Y'circle in center of mill with not
much wear. Recovered 17#junk ~ 20% wire / 80 %
steel cutting.
BHA Stood back
BHA run no. 6
Made up BHA no. 6
Make up shoe #4- 6 1/8" OD x 5 3/16" ID,
extensions, 3- junk baskets
BHA no. 6 made up
Serviced Top drive
Equipment work completed
R.I.H. to 13723.0 ft
D 1 drill @ 2200 hrs - 3 min.
Observed 5.00 klb resistance
Milled Other sub-surface equipment at 13724.0 ft
Mill over fish from 13,722.5' to 13,724' (1.5').
Spud on shoe with bumper sub.
Completed operations
Pulled out of hole to 5000.0 ft
Finished POOH with shoe #4
Pulled out of hole to 5000.0 ft
Slug DP - start POOH w/shoe #4.
BHA run no. 6 (cont...)
Pulled out of hole to 234.0 ft (cont...)
Slug DP - start POOH w/shoe #4.
At BHA
Pulled BHA
o~hoc w&s worc out - nu ~.~uwn ,~t. ~',a~ ~mu ug~l up
Facility West Beach
Date/Time
09:00
09:00-23:30
09:00-09:30
09:30
09:30-14:30
14:30
14:30-15:30
15:30
15:30-16:30
16:30
16:30-17:30
17:30
17:30-18:00
18:00
18:00-22:00
22:00
22:00-22:30
22:30
22:30-23:30
23:30
23:30~06:00
23:30-00:30
06 Nov 98 00:30
00:30-04:30
04:30
04:30-06:00
04:30-06:00
06:00-16:30
06:00-08:30
Progress Report
Well WB-05B Page 21
Rig POOL 7 Date 11 August 99
Duration
14-1/2 hr
1/2 hr
5 hr
1 hr
1 hr
1 hr
1/2 hr
4 hr
1/2 hr
1 hr
6-1/2 hr
1 hr
4 hr
1-1/2 hr
1-1/2 hr
10-1/2 hr
2-1/2 hr
Activity inside shoe 20 inches. Emptied junk basket - few
BHA Stood back
BHA run no. 7
Made up BHA no. 7
5 1/4" x 3 5/8" Box tap, bumper sub, jars, DC's,
circ sub.
BHA no. 7 made up
R.I.H. to 13700.0 ft
Spill drill @ 1400 hrs - 3 min.
Began precautionary measures
Fished at 13721.0 ft
Break circ and wash down rotating 40rpm. Attempted
to screw Box Top onto fish. Had 100 psi pressure
increase - 8K on tap. Pick up and maintained pump
pressure increase.
Pressure changed from 300.0 psi to 400.0 psi in 0.10 hr - String block
Held safety meeting
Saftey awarness meeting with Dan Stoltz, Herb
Williams, and crew. Wait on ball and rod. Pump
slug. Ball did not seat.
Completed operations
Pulled out of hole to 13000.0 ft
Start POOH with box tap. Came wet.
Stopped: To circulate
Circulated at 13000.0 ft
Sheared circ sub.
Broke circulation
Pulled out of hole to 211.0 ft
POOH w/Box tap.
At BHA
Pulled BHA
LD Box tap - recovered parted float sub with float
inside (length 0.89'). Fish left in hole - 5" OD
chiesel bottom nose guide - length 1.10'.
BHA Stood back
Serviced Block line
Cut drilling line.
Line slipped and cut
BHA run no. 8
Made up BHA no. 8
6 1/8" OD slightly concave metal muncher mill, 4 -
junk baskets, bumper sub and jars, ect.
BHA no. 8 made up
R.I.H. to 13723.0 ft
Tagged up on fish @ 13,724'.
On bottom
Milled Other sub-surface equipment at 13724.0 ft
Mill on fish @ 13,724'.
Milled Other sub-surface equipment at 13724.0 ft
Milled up fish and float collar to 13,732'. Cleaned
out good cement at 30 fph from 13,732' - 13,777'.
BHA run no. 8 (cont...)
Milled Other sub-surface equipment at 13724.0 ft (cont...)
Milled up fish and float collar to 13,732'. Cleaned
out good cement at 30 fph from 13,732' - 13,777'.
Facility
Date/Time
West Beach
08:30
08:30-10:00
10:00
10:00-14:30
Duration
1-1/2 hr
4-1/2 hr
14:30
14:30-16:30
2 hr
16:30
16:30-03:45
16:30-19:30
11-1/4 hr
3 hr
19:30
19:30-23:00
23:00
23:00-23:30
3-1/2 hr
1/2 hr
23:30
23:30-00:00
1/2 hr
07 Nov 98 00:00
00:00-02:15
2-1/4 hr
02:15
02:15-03:00
03:00
03:00-03:45
03:45
03:45-04:30
03:45-04:30
04:30
04:30-06:00
04:30-05:00
05:00
05:00-06:00
05:00-06:00
3/4 hr
3/4 hr
3/4 hr
3/4 hr
1-1/2 hr
1/2 hr
1 hr
1 hr
06:00-03:00
06:00-12:30
Progress Report
Well WB-05B Page 22
Rig POOL 7 Date 11 August 99
21hr
6-1/2 hr
Activity
No further resistance
Circulated at 13777.0 ft
Circ hole clean.
Obtained clean returns - 150.00 % hole volume
Pulled out of hole to 1000.0 ft
Slug DP - POOH with mill #2. D1 drill @ 1100 hrs ~
3 min.
At BHA
Pulled BHA
LD DC's, BS, jars, JB's, and Mill. Mill 25% wear -
Recover 4 lbs steel cutting/junk in junk baskets.
BI-IA Laid out
BHA run no. 9
Made up BHA no. 9
6" STR09D, 43/4" adj motor - 0.78 deg, stab, NM
flex, MWD, ADN. Orient tools and load source. Surface
test.
BHA no. 9 made up
R.I.H. to 13747.0 ft
Fill DP. D 1 drill @ 2200 hrs - 3 min.
On bottom
Held safety meeting
Pre - reservoir meeting - crew, pusher, co. man,
mud engineer, mud logger, DD, anadril MWD.
Completed operations
Drilled cement to 13807.0 ft
Drilled out cement f/13,777'- 13,806'. Drilled
shoe @ 13,807'.
At 7in casing shoe
Washed to 13853.0 ft
Hole packing off below shoe f/13,807' - 13,812'.
No problem f/13,812' to bottom @ 13,853'.
On bottom
Drilled to 13873.0 ft
Began precautionary measures
Circulated at 13873.0 ft
Circ bottoms up and condition mud for FIT test.
Obtained req. fluid properties - 100.00 %, hole vol.
Perform integrity test
Performed formation integrity test
Obtained required level of integrity - 13.0 ppg EMW
BHA run no. 9
Took MWD survey at 13816.0 ft
Acceptable survey obtained at 13768.0 ft
Drilled to 13912.0 ft
ART= 1.2 hrs, AST= 0 hrs.
Drilled to 13912.0 ft
Drill from 13,912' ~ 14,060'. Top of Kuparuk @
13,810' (8,755'TVD), Base of Kuparku @ 13,879' (
8,792' TVD). D2 drill @ 1130 hrs - 2.5 min.
BHA run no. 9 (cont...)
Drilled to 14060.0 ft (cont...)
Drill from 13,912' - 14,060'. Top of Kuparuk @
13,810' (8,755'TVD), Base of Kuparku @ 13,879' (
Facility West Beach
Date/Time
12:30
12:30-13:45
13:45
13:45-14:15
14:15
14:15-17:00
17:00
17:00-19:30
19:30
19:30-01:00
08 Nov 98 01:00
01:00-03:00
03:00
03:00-06:00
03:00-06:00
03:00-06:00
06:00-11:30
06:00-10:00
10:00
10:00-11:30
11:30
11:30-21:00
11:30-14:00
14:00
Progress Report
Well WB-05B Page 23
Rig POOL7 Date 11 August 99
Duration
Activity
1-1/4 hr
1/2 hr
2-3/4 hr
2-1/2 hr
5-1/2 hr
2 hr
3 hr
3 hr
3 hr
5-1/2 hr
4 hr
1-1/2 hr
9-1/2 hr
2-1/2 hr
Reached planned end of run - Section / well T.D.
Circulated at 14060.0 ft
Circ and condition mud and hole for short
trip.
Obtained clean returns - 125.00 % hole volume
Pulled out of hole to 13777.0 ft
POOH to 13,777'. Had 40K drag / swabbing @ 13,935'
- 13,925'.
At top of check trip interval
Logged hole with LWD: Formation evaluation (FE) from 13830.0 ft to
13980.0 ft
Mad pass w/LWD's at 100 fph. RIH to 14,060'TD.
Log down over interval from 13830.0 ft to 13980.0 ft
Circulated at 14060.0 ft
Pump sweep around - hole would not circ clean -
kingak shale. Pulled up to 13,890' - 20K drag @
13,935'. Circ 1/4 hrs @ 13,890' - pull into 7"
shoe @ 13,800' and circ hole clean. Spill drill @
1830 hfs - 3 min.
Obtained clean returns - 350.00 % hole volume
Pulled out of hole to 414.0 ft
At BHA
Pulled BHA
LD LWD,MWD, motor.
BHA Laid out
Electric wireline work
Conducted electric cable operations
RU schlumberger. PU RFT tools. PJSM. RIH with RFrr
tools to 13,878'. Take pressures in Kuparuk.
Conducted electric cable operations
Take pressure build ups in Kuparuk sand @
13,822',13,843', 13,846', 13850, 13,858',13,860',
13,865', 13,870', and 13,833'. Took samples @
13,860'. No hole problems. Spill drill @ 0830 hrs
- 2 min.
Electric wireline work (cont...)
Conducted electric cable operations (cont...)
Take pressure build ups in Kupamk sand @
13,822',13,843', 13,846', 13850,, 13,858',13,860',
13,865', 13,870', and 13,833'. Took samples @
13,860'. No hole problems. Spill drill @ 0830 hrs
- 2 min.
Completed logging run with RFT from 13822.0 ft to 13870.0 ft
Conducted electric cable operations
POOH with wire line - LD logging tools - Sample
chambers went to Core-Lab. H2S drill @ 1130 hrs -
3 min.
Completed logging run with RFT from 13810.0 ft to 13870.0 ft
3-1/2in. Cement stinger workstring run
Ran Drillpipe to 2097.0 ft (3-1/2in OD)
PTSM. Make up mule shoe sub and RIH picking up 3
1/2 DP for cement stinger.
Stopped: To change handling equipment
Facility West Beach
Date/Time
14:00-17:30
17:30
17:30-21:00
21:00
21:00-21:45
21:00-21:45
21:45
21:45-05:00
21:45-22:15
22:15
22:15-23:30
23:30
23:30-01:00
09 Nov 98 01:00
01:00-05:00
05:00
05:00-06:00
05:00-06:00
05:00-06:00
06:00-09:30
06:00-09:30
09:30
09:30-04:30
09:30-10:30
10:30
10:30-11:30
Progress Report
Well WB-05B Page 24
Rig POOL7 Date 11 August 99
Duration
3-1/2 hr
3-1/2 hr
3/4 hr
3/4 hr
7-1/4 hr
1/2 hr
1-1/4 hr
1-1/2 hr
4 hr
1 hr
I hr
1 hr
3-1/2 hr
3-1/2 hr
19hr
1 hr
1 hr
Activity
Ran Drillpipe in stands to 14060.0 ft
RIH with 4" DP to spot cement kick off plug.
On bottom
Circulated at 14055.0 ft
Circ and conditon mud to spot balanced cement
kick-off plug. PJSM. Batch up cement.
Obtained req. fluid properties - 350.00 %, hole vol.
Cement: Kickoff plug
Mixed and pumped slurry - 32.000 bbl
Spotted kick off plug. Howco pumped 25 bbsl
water, 32 bbls slurry @ 17.0 ppg, 7 bbls water.
Displace with rig pumps @ 6.3 BPM.Rotate /
recipicate. Hole packed off
with 7.5 bbls cement out drill pipe in open hole.
Worked pipe free.
Began precautionary measures
Attempt to finish displacement - packed off -
pulled 100k over to free pipe.
Pull Drillpipe, 4in O.D.
Pulled Drillpipe in stands to 13180.0 ft
Pulled 9 stands drill pipe to 13,180'. Had 30K -
50K drag pulling out of open hole.
Began precautionary measures
Circulated at 13180.0 ft
Circ 10 bbls cement to surface.
Obtained clean returns - 130.00 % hole volume
Cleared Cement head
Blow down cementing standpipe, clean out possum
bellies, build slug, and rig up kelly hose.
Equipment work completed
Pulled Drillpipe in stands to 0.0 ft
POOH with 3 1/2" DP cementing stinger.
Completed operations
Test well control equipment
Tested BOP stack
Pull wear ring and set test plug. Start testing
BOP's.
Tested BOP stack
Test Hydril to 250/3500 psi. Test Rams, Choke &
Kill line manual & HCR valves, Choke manifold, Floor
& Top drive valves to 300/5000 psi. Rig down test
equip, Set wear bushing.
Test well control equipment (cont...)
Tested Well control (cont...)
Test Hydril to 250/3500 psi. Test Rams, Choke &
Kill line manual & HCR valves, Choke manifold, Floor
& Top drive valves to 300/5000 psi. Rig down test
equip, Set wear bushing.
Pressure test completed successfully - 5000.000 psi
BHA run no. 10
Serviced Drillfloor / Derrick
Service rig & Top drive.
Equipment work completed
Made up BHA no. 10
Facility West Beach
Date/Time
11:30
11:30-16:30
16:30
16:30-17:00
Duration
5 hr
1/2 hr
17:00
17:00-22:00
5 hr
22:00
22:00-00:00
10 Nov 98 00:00
00:00-04:00
2 hr
4 hr
04:00
04:00-04:30
04:30
1/2 hr
Progress Report
Well WB-05B Page 25
Rig POOL 7 Date 11 August 99
04:30-06:00
04:30-06:00
06:00-06:30
06:00-06:30
06:30
06:30-07:30
06:30-07:30
07:30
07:30-08:30
07:30-08:30
08:30
08:30-06:00
08:30-09:00
09:00
09:00-13:00
13:00
13:00-15:45
15:45
15:45-17:00
17:00
17:00-20:00
20:00
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1 hr
1 hr
1 hr
1 hr
21-1/2 hr
1/2 hr
4 hr
2-3/4 hr
1 ~ 1/4 hr
3 hr
Activity
BHA no. 10 made up
R.I.H. to 13176.0 ft
D1 DRILL @ 12:30 HRS, 3 MINS
Began precautionary measures
Serviced Brake
Fill pipe, circulate, Inspect brake bands &
linkage, WOC
Equipment work completed
Drilled cement to 13809.0 ft
Drill cement stringers from 13190', firm cmt from
13530', Hard cmt from 13623' to casing shoe @
13809'
At 7in casing shoe
Circulated at 13809.0 ft
Circulate hole clean at 110 rpm, 350 gpm
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 323.0 ft
Pump dry job, Blow down Top drive, POOH
D1 DRILL @ 01:30 HRS, 3 MINS
At BHA
Pulled BHA
BHA Stood back
Derrick management
Laid out 3-1/2in drill pipe from derrick
L/D 3-1/2 cement stinger.
Derrick management
Laid out 3-1/2in drill pipe from derrick
L/D cement stinger
66 joints laid out
BHA run no. 11
Made up BHA no. 11
Stopped: To change handling equipment
Suspend operations
Rig waited: Equipment
Anadrill didn't have the proper XO to make up the
MWD tool
Resumed operations
BHA run no. 11
Made up BHA no. 11
Make up and surface test MWD
BHA no. 11 made up
R.I.H. to 13809.0 ft
At Kick off depth: 13809.0 ft
Drilled to 13815.0 ft
Time drilled 5-1/2' @ 3' hr. Packed off.
FIRE DRILL @ 13:30 HRS, 3 MINS
Pressure changed from 2450.0 psi to 2850.0 psi in 0.05 hr - Hole
deteriorated
Worked toolstring at 13815.0 ft
Set back a double. Work pipe and circulate. Clean
up hole.
On bottom
Drilled to 13830.0 ft
Pressure changed from 3200.0 psi to 3600.0 psi in 0.03 hr - Hole
deteriorated
Facility West Beach
Date/Time Duration
20:00-21:30 1-1/2 hr
21:30
21:30-00:15 2-3/4 hr
llNov98 00:15
00:15-02:00 1-3/4 hr
02:00
02:00-06:00 4 hr
06:00-08:00 2 hr
06:00-07:00 1 hr
07:00
07:00-08:00 1 hr
08:00
08:00-06:00 22 hr
08:00-09:00 1 hr
09:00
09:00-10:00 1 hr
10:00
10:00-11:00 1 hr
11:00
11:00-15:00 4hr
15:00
15:00-16:30 1-1/2 hr
16:30
16:30-06:00 13-1/2 hr
12 Nov 98 06:00-06:00 24 hr
06:00-16:45 10-3/4 hr
16:45
16:45-18:30 1-3/4 hr
18:30
18:30-06:00 11-1/2 hr
13 Nov 98 06:00-15:00 9 hr
06:00-06:15 1/4 hr
06:15
06:15-07:30 1-1/4 hr
Progress Report
Well WB-05B Page
Rig POOL 7 Date
26
11 August 99
Activity Hole packing off at connection.
Worked toolstring at 13830.0 ft
Work pipe and circulate. Clean up hole.
Completed operations
Drilled to 13887.0 ft Slide drilling.
Total AST= 8-1/2 hrs
Reached planned end of run - Directional objective met
Circulated at 13887.0 ft
Circulate 100 bbls on bottom, Set back two singles,
CBU from inside casing.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 1500.0 ft
BHA run no. 11 (cont...)
Pulled out of hole to 374.0 ft
At BHA
Pulled BHA
BHA Laid out
BHA run no. 12
Made up BHA no. 12
Stopped · To service drilling equipment
Waiting on orders
Serviced Drillfloor / Derrick
Service drawworks and Top drive
Equipment work completed
Made up BHA no. 12
BHA no. 12 made up
R.I.H. to 13807.0 ft
D1 DRILL @ 12:30 HRS, 2-1/2 M1NS
At 7in casing shoe
Circulated at 13807.0 ft
Circulate to clean up hole that couldn't be cleaned
on last bit run.
Obtained clean returns - 200.00 % hole volume
Drilled to 14141.0 ft
RIH 80' to btm no problem. Slide ahead completing
angle build and turn azimuth.
ART= 1 hr, AST= 10-1/4 hrs
FIRE DRILL @ 03:20 HRS, 3-1/2 MINS
BHA run no. 12 (cont...)
Drilled to 14324.0 ft
ART= 4-1/4 hrs, AST= 5-1/4 hrs
Began precautionary measures
Circulated at 14324.0 ft
Circulate cuttings to surface to correlate depth.
Obtained required geologic samples
Drilled to 14400.0 fl
ART= 0 hrs. AST= 10-3/4 hrs
BHA run no. 12 (cont...)
Drilled to 14401.0 ft
ART= 1/4 hr
Downhole tools failed - End BHA run
Bit acting locked up, differential press
fluctuation, penetration rate dropped off
Circulated at 14401.0 ft
CBU, monitorw~,,,'-" pump~,,~-'~ :-'- '-' '~' "'-- ~-'-'-
Facility West Beach
Date/Time
07:30
07:30-11:00
11:00
11:00-12:00
12:00
12:00-13:30
13:30
13:30-15:00
15:00
15:00-06:00
15:00-16:00
16:00
16:00-21:30
21:30
21:30-22:00
22:00
22:00-23:30
14 Nov 98
23:30
23:30-06:00
06:00-02:30
06:00-17:30
17:30
17:30-19:00
19:00
19:00-19:30
19:30
19:30-01:00
15 Nov 98 01:00
01:00-02:30
02:30
02:30-06:00
02:30-04:30
Progress Report
Well WB-05B Page 27
Rig POOL7 Date 11 August 99
Duration
Activity
3-1/2 hr
1 hr
1-1/2 hr
1-1/2 hr
15hr
1 hr
5-1/2 hr
1/2 hr
1-1/2 hr
6-1/2 hr
20-1/2 hr
11-1/2 hr
1-1/2 hr
1/2 hr
5-1/2 hr
1-1/2 hr
3-1/2 hr
2 hr
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 4000.0 fi
Stopped: To service drilling equipment
Serviced Block line
Line slipped and cut
Pulled out of hole to 195.0 ft
At BHA
Pulled BHA
Change bit, Inspect motor, Orient to MWD,
Download MWD/CDR
BHA Stood back
BHA run no. 13
Made up BHA no. 13
PFU BHA, P/U 5 jts DP and accelerators
BHA no. 13 made up
R.I.H. to 13800.0 ft
RIH to 1000', Surface test MWD, RIH to shoe
D1 DRILL @ 20:00 HRS, 3 MINS
At 7in casing shoe
R.I.H. to 14298.0 fi
Orient high side, Run in open hole.
Began precautionary measures
Reamed to 14401.0 fi
Ream to bottom, Underguage hole from 14320'.
Take ck shot survey at 14382'.
On bottom
Drilled to 14575.0 ft
ART= 5-1/4 hrs, AST= 1/4 hr
BHA run no. 13 (cont...)
Drilled to 14795.0 ft
ART= 6-3/4 hrs, AST= 2-1/4 hrs
FIRE DRILL @ 11:00 HRS, 2-1/2 MINS
Pressure changed from 3075.0 psi to 3200.0 psi in 0.50 hr - Downhol,
tool failure
Differential pressure from motor increased. Motor
stalled. IAB tool showed 1.5 degree angle drop
in 8 ft. Probable bit failure.
Circulated at 14794.0 ft
Obtained clean returns - 150.00 % hole volume
Flow check
Take SPR, Monitor well, Pump dry job, Blow down
Top drive.
Observed well static
Pulled out of hole to 392.0 ft
D1 DRILL @ 20:00 HRS, 2-1/2 MINS
At BHA
Pulled BHA
L/D Bit, Motor, Impulse tool, Stabilizer
BHA Stood back
BHA run no. 14
Made up BHA no. 14
P/U new MWD, Motor, Bit. L/D Accelerators
& 5 jts DP.
Facility
Date/Time
16 Nov 98
West Beach
04:30
04:30-06:00
06:00-06:00
06:00-1 O: 15
Duration
1-1/2 hr
24 hr
4-1/4 hr
10:15
10:15-11:00
11:00
11:00-06:00
3/4 hr
19hr
06:00-14:30
06:00-07:00
07:00
07:00-08:30
8-1/2 hr
1 hr
1-1/2 hr
08:30
08:30-13:30
13:30
13:30-14:30
14:30
5 hr
1 hr
14:30-18:30
14:30-18:30
4 hr
4 hr
18:30
18:30-06:00
18:30-19:30
19:30
19:30-22:00
11-1/2 hr
1 hr
2-1/2 hr
22:00
22:00-00:30
17 Nov 98 00:30
00:30-05:00
2-1/2 hr
4-1/2 hr
Progress Report
Well WB-05B Page 28
Rig POOL 7 Date 11 August 99
05:00
05:00-06:00
1 hr
Activity
BHA no. 14 made up
R.I.H. to 3600.0 ft
RIH, Surface test MWD, Blow down Top drive. RIH
BHA run no. 14 (cont...)
R.I.H. to 14582.0 ft
RIH to the shoe, Orient high side, RIH to 2 stds
off btm.
Began precautionary measures
Reamed to 14794.0 ft
Ream last 2 stds to bottom.
On bottom
Drilled to 14968.0 ft
ART= 4-3/4 hrs, AST= 12 hrs
SPILL DRILL @ 11:30 HRS, 3 MINS
FIRE DRILL @ 19:00 HRS, 2-1/2 MINS
BHA run no. 14 (cont...)
Drilled to 14971.0 ft
ART= 0 hrs, AST= 1 hr
ROP dropped from 8.0 ft/hr to 2.0 ft/hr - Bit quit
Circulated at 14971.0 ft
CBU, Monitor well, Pump dry job, Blow down Top
drive.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 195.0 ft
At BHA
Pulled BHA
BHA Laid out
Test well control equipment
Tested Well control
M/U test jr, Pull bowl protector, Install test
plug, Test Hydrill to 250/3500 psi. Test rams and
valves to 250/5000 psi. Test Koomey, Blow down choke &
kill lines. Install wear ring.
Pressure test completed successfully - 5000.000 psi
Witnessing of BOP test waived by State man Chuck
Sheve.
SPILL DRILL @ 18:30 HRS, 3 MINS
BHA run no. 15
Serviced Survey instruments
Wait on Anadrill to program Impulse & motor.
Equipment work completed
Made up BHA no. 15
P/U motor, MWD, 5 jts DP & Accelerators.
BHA no. 15 made up
Functioned downhole tools at 2010.0
RIH to 670', Test MWD, no test. RIH to 1150' test
MWD, no test. RIH to 2010' test MWD, no test.
Reconfigure Anadrill computer, tool tested
Equipment work completed
R.I.H. to 14683.0 fl
RIH to shoe at 13808', Orient, RIH
Stopped · To take survey
Took MWD survey at 14332.0 ft
Took weight at 14337', Work pipe, packed off when
~,~ L,, ..... pun,ps on. Got survcy.
Facility
Date/Time
18 Nov 98
19 Nov 98
Progress Report
West Beach
Well WB-05B Page 29
Rig POOL7 Date 11 August 99
06:00
06:00-06:00
06:00-09:30
09:30
09:30-09:45
09:45
09:45-10:00
10:00
10:00-12:00
12:00
12:00-06:00
06:00-06:00
06:00-09:30
09:30
09:30-06:00
06:00-15:30
06:00-09:00
09:00
09:00-14:00
14:00
14:00-15:30
15:30
15:30-06:00
15:30-17:30
17:30
17:30-22:00
22:00
22:00-00:30
Duration
24 hr
3-1/2 hr
1/4 hr
1/4 hr
2 hr
18hr
24 hr
3-1/2 hr
20-1/2 hr
9-1/2 hr
3 hr
5 hr
1-1/2 hr
14-1/2 hr
2 hr
4-1/2 hr
2-1/2 hr
Activity pack@ff. RIH to kickoff point to get BHA below problem
Acceptable survey obtained at 14332.0 ft
BHA run no. 15 (cont...)
Circulated at 14680.0 ft
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 14215.0 ft
Pull 5 stds through packoff/tight area
At top of check trip interval
R.I.H. to 14721.0 ft
At Kick off depth · 14721.5 ft
Reamed to 14721.5 ft
Trenching from 14691' to 14721' for open hole
sidetrack. IAB showed 0.4 degree drop while
building trench.
Completed precautionary measures
Drilled to 14739.5 ft
Time drilling, 10' @ 1 ft/hr. 10' @ 2 ft/hr.
IAB shows 86.0 degrees at bit. (2.2 degree drop)
SPILL DRILL @ 12:00 HRS, 2 MINS
FIRE DRILL @ 21;00 HRS, 3 MINS
BHA run no. 15 (cont...)
Drilled to 14755.5 ft
Time drilling for OH sidetrack.
AST= 3-1/2 hrs
Stopped · To correlate depth
Hole sidetracked. Angle 84 deg-rees.
Drilled to 15062.5 ft
ART= 10-1/4 hrs, AST= 7-3/4 hfs
D1 DRILL @ 13:30 HRS, 3 MINS
D2 DRILL @ 22:50 HRS, 2-1/2 MINS ·
BHA run no. 15 (cont...)
Circulated at 15062.5 ft
Circulate low/high sweeps around.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 392.5 ft
SPR, Pump dry job, monitor well, Pull to shoe, hole
in good shape. POOH
D1 DRILL @ 11:30 HRS, 2-1/2 MINS
At BHA
Pulled BHA
L/D jars, pickup new jars and set back,
L/D bit & motor.
BHA Stood back
BHA run no. 16
Made up BHA no. 16
PFO motor & bit. Download MWD. Orient MWD & motor.
BHA no. 16 made up
R.I.H. to 13807.5 ft
RIH to 1340', Surface test MWD. Blow down Top
drive. RIH
D1 DRILL @ 22:00 HRS, 2-1/2 MINS
At 7in casing shoe
Worked toolstring at 13813.5 ft
Orient high side. Try to work pipe into open hole
through kickoff. Taking weight on a ledge @ 13813',
,~uutu, t wu,~ tt-uug, dog
311UU.
~JUL
Facility West Beach
Date/Time
20 Nov 98 00:30
00:30-05:30
05:30
05:30-06:00
06:00-06:30
06:00-06:30
06:30
06:30-00:30
06:30-08:00
08:00
08:00-12:00
12:00
12:00-14:00
Duration
5 hr
1/2 hr
1/2 hr
1/2 hr
18hr
1-1/2 hr
4 hr
2 hr
14:00
14:00-15:30
15:30
15:30-18:00
1-1/2 hr
2-1/2 hr
18:00
18:00-23:30
23:30
23:30-00:30
5-1/2 hr
1 hr
21 Nov 98 00:30
00:30-06:00
00:30-02:00
5-1/2 hr
1-1/2 hr
02:00
02:00-06:00
06:00
06:00-22:00
06:00-10:00
4 hr
16hr
4 hr
10:00
10:00-16:00
16:00
16:00-21:00
6 hr
21:00
5 hr
Progress Report
Well WB-05B Page
Rig POOL 7 Date
30
11 August 99
Completed operations
Pulled out of hole to 374.5 ft
D1 DRILL @ 20:00 HRS, 2-1/2 MINS
At BHA
Activity leg.
Began precautionary measures
Pulled out of hole to 395.5 ft
SPR, Monitor well, pump dry job, Blow down Top
drive. POOH to change motor bend.
At BHA
Pulled BHA
BHA run no. 16 (cont...)
Pulled BHA
L/D Motor, LDC, Stab
BHA Stood back
BHA run no. 17
Made up BHA no. 17
PTSM, Orient tool, RIH to 1230', Surface test MWD.
BHA no. 17 made up
R.I.H. to 13800.5 ft
At 7in casing shoe
Reamed to 13832.5 ft
Working fight hole and build section doglegs.
Began precautionary measures
Circulated at 13808.5 ft
Obtained clean returns - 150.00 % hole volume
Reamed to 13850.5 ft
Work tight hole. String taking weight, no
differential, bit under guage.
Observed 50.00 klb resistance
Pulled out of hole to 392.5 ft
PJSM, Monitor well, Pump dry job, Blow down Top
drive, POOH
SPILL DRILL @ 21:30 HRS, 2-1/2 MINS
At BHA
Pulled BHA
L/D motor & bit
BHA Stood back
BHA run no. 18
Made up BHA no. 18
PFLI motor, Orient tools, RIH to 1322', Surface test
MWD
BHA no. 18 made up
R.I.H. to 13800.5 ft
At 7in casing shoe
BHA run no. 18 (cont...)
Reamed to 13950.5 ft
Ream open hole through big doglegs in build
section.
H2S DRILL @ 10:00 HRS, 3 MINS
Began precautionary measures
Worked toolstring at 13858.5 ft
Ream and clean up tight spots in build section
until we could run through without pumps.
Facility
Date/Time
West Beach
21:00-22:00
22:00
22:00-06:00
22:00-00:00
22 Nov 98 00:00
00:00-01:00
Duration
1 hr
8 hr
2 hr
1 hr
01:00
01:00-04:00
04:00
04:00-05:00
05:00
05:00-05:30
05:30
05:30-06:00
06:00-03:00
06:00-07:00
07:00
07:00-08:30
08:30
08:30-09:00
09:00
09:00-03:00
3 hr
1 hr
1/2 hr
1/2 hr
21hr
1 hr
1-1/2 hr
1/2 hr
18hr
23 Nov 98 03:00
03:00-04:00
03:00-04:00
04:00
04:00-04:30
04:00-04:30
1 hr
1 hr
1/2 hr
1/2 hr
04:30
04:30-06:00
04:30-05:30
05:30
05:30-06:00
05:30-06:00
06:00-13:00
06:00-07:30
1-1/2 hr
1 hr
1/2 hr
1/2 hr
7 hr
1-1/2 hr
Progress Report
Well WB-05B Page 31
Rig POOL 7 Date 11 August 99
Activity
Pulled BHA
L/D Motor
BHA Stood back
BHA run no. 19
Made up BHA no. 19
P/U Motor, LDC, Stab, Program MWD.
BHA no. 19 made up
Laid down 187.0 ft of 4in OD drill pipe
L/D 6 bent its of DP from stds 2, 4 & 5, replace w/
stds from derrick.
6 joints laid out
R.I.H. to 9976.5 ft
Surface test MWD. RIH
Stopped: To service drilling equipment
Serviced Block line
Line slipped and cut
Serviced Top drive
Equipment work completed
R.I.H. to 11860.5 ft
BHA run no. 19 (cont...)
R.I.H. to 13785.5 ft
L/D a single, Fill pipe, Orient toolface.
At 7in casing shoe
R.I.H. to 14970.5 ft
Run through build section with no problems.
Began precautionary measures
Reamed to 15062.5 ft
Precautionary ream the last stand to bottom.
On bottom
Drilled to 15538.5 ft
ART-- 12.5 hrs, AST= 2.5hrs
SPILL DRILL @ 12:00 HRS, 3 MINS
FIRE DRILL @ 21:00 HRS, 2-1/2 MINS
Top drive blower failed - Change operation
Repair
Repaired Top drive bloWer
Trouble shoot top drive blower.
Equipment work completed
BHA run no. 19
Drilled to 15538.5 ft
Slide to 15,538' AST - 1/2hrs. ( Wait on
electircian).
Began precautionary measures
Repair
Circulated at 15538.5 ft
Circ while electrician checks out top drive blower.
Began precautionary measures
Pulled out of hole to 15000.5 ft
POOH to 7" shoe - blow down top drive.
Pulled out of hole to 15000.5 ft
Start POOH to shoe to repair top drive blower.
Repair (cont...)
Pulled out of hole to 13800.5 ft (cont...)
Start POOH to shoe to repair top drive blower.
Facility
Date/Time
West Beach
Duration
07:30
07:30-11:30 4 hr
11:30
11:30-13:00 1-1/2 hr
13:00
13:00-01:30 12-1/2 hr
13:00-16:00 3 hr
16:00
16:00-17:00 1 hr
17:00
17:00-17:30 1/2 hr
17:30
17:30-19:00 1-1/2 hr
19:00
19:00-00:30 5-1/2 hr
24 Nov 98 00:30
00:30-01:30 1 hr
01:30
01:30-06:00 4-1/2 hr
01:30-02:30 1 hr
02:30
02:30-06:00 3-1/2 hr
02:30-06:00 3-1/2 hr
06:00-08:00 2 hr
06:00-08:00 2 hr
08:00
08:00-06:00 22 hr
08:00-09:30 1-1/2 hr
Progress Report
Well WB-05B Page 32
Rig POOL7 Date 11 August 99
Activity
At 7in casing shoe
Repaired Top drive blower
Equipment work completed
R.I.H. to 15838.5 ft
Orient to high side - run bit thru side track f/
13,807' - 13,830' pumping 30 spm - took 25K to work
thru side track. RIH orient to low side and ran
thru open hole side track @ 14,721' and ran to bottom
- no problems.
On bottom
BHA run no. 19
Drilled to 15596.5 ft
Drill from 15,538' - 15,596' - motor stalling. ART=
1.5 hrs.
Had change in torque from 15000 ft.lb to 15000 ft.lb - Bit quit
Motor stalling.
Circulated at 15596.5 ft
Circ bottoms up - build slug.
Obtained bottoms up (100% annulus volume)
Flow check
Observe well - slug drill pipe.
Observed well static
Pulled out of hole to 13630.5 ft
Start POOH. Hole in good shape.
At 7in casing shoe
Pulled out of hole to 400.5 ft
PJSM. POOH for bit.
At BHA
Pulled BHA
LD MWD and motor. Bit 5/8" under gage - stablizer
1/4" undergage.
BHA Laid out
Test well control equipment
Retrieved Bore protector
Pulled wear ring and set test plug - change ring
gasket in spacer spool. PJSM.
Equipment work completed
Tested BOP stack
Finished testing BOP' s. Accumulator drill. No
leaks. Set wear ring.
Tested BOP stack
Test BOP's as per SSD policy to 250 psi low and
5,000 psi high - hydril to 3,500 psi. Test witness
waived by Larry Wade with AOGCC.
Test well control equipment (cont...)
Tested BOP stack (cont...)
Test BOP's as per SSD policy to 250 psi low and
5,000 psi high - hydril to 3,500 psi. Test witness
waived by Larry Wade with AOGCC.
Pressure test completed successfully - 5000.000 psi
BHA run no. 20
Made up BHA no. 20
6" STR20DDT, 1.5 deg SSS ADJ motor with IAB, stab,
NMLC, MWD,GR, Resistivity. Orient tools.
Facility
Date/Time
Duration
West Beach
09:30
09:30-12:00 2-1/2 hr
12:00
12:00-12:30 1/2 hr
12:30
12:30-15:30 3 hr
15:30
15:30-17:00 1-1/2 hr
17:00
17:00-06:00 13 hr
17:00-06:00 13 hr
24 hr
20-1/2 hr
25 Nov 98 06:00-06:00
06:00-02:30
26 Nov 98 02:30
02:30-04:30 2 hr
04:30
04:30-06:00 1-1/2 hr
04:30-06:00 1-1/2 hr
06:00-20:00 14 hr
06:00-06:30 1/2 hr
06:30
06:30-07:30 1 hr
07:30
07:30-10:30 3 hr
10:30
10:30-17:00 6-1/2 hr
Progress Report
17:00
Well WB-05B Page 33
Rig POOL 7 Date 11 August 99
Activity
BHA no. 20 made up
R.I.H. to 8632.5 ft
Surface test - RIH.
Began precautionary measures
Serviced Travelling block
Service rig - fill pipe.
Equipment work completed
R.I.H. to 15353.5 ft
Orient to high side @ 7" shoe. Ran thru side track
without pump - took 30 - 40K f/13,810' - 14,014'.
Ran in hole to 15,353'.
Began precautionary measures
Reamed to 15596.5 ft
Ream from 15,353' to bottom at 15,596'. No
problems.
On bottom
Drilled to 15805.5 fl
Drill from 15,596' - 15,810'. ART--7 3/4 hrs, AST= 3
hrs. Fire drill @ 1730 hrs. Spill drill @ 2230
hrs.
Drilled to 15805.5 ft
Drilled from 15,810' - 16,100'. ART = 13 hrs, AST =
4 hrs. D2 drill @ 1000 hrs - 2.5 min., D2 drill @
2000 hrs - 3 min.Top of Kingak shale @ 16,040'.
BHA run no. 20 (cont...)
Drilled to 16100.5 ft (cont...)
Drilled from 15,810' - 16,100'. ART = 13 hrs, AST =
4 hrs. D2 drill @ 1000 hrs - 2.5 min., D2 drill @
2000 hrs - 3 min.Top of Kingak shale @ 16,040'.
Reached planned end of run - Section / well T.D.
Circulated at 16100.5 ft
Circ hole clean.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 13850.5 ft
POOH to 7" shoe @ 13,800'. No problems.
Pulled out of hole to 13850.5 ft
Observe well, slug drill pipe, blow down - start
short trip to 7" shoe.
BHA run no. 20 (cont...)
Pulled out of hole to 13850.5 ft (cont...)
Observe well, slug drill pipe, blow down - start
short trip to 7" shoe.
At top of check trip interval
R.I.H. to 16100.5 fl
RIH - washed 50' to bottom. Hole in good shape.
On bottom
Circulated at 16100.5 ft
Circ hole clean - spot 100bbl Lub-Tex pill in open
hole.
Obtained clean returns - 250.00 % hole volume
Pulled out of hole to 400.5 ft
Observe well, slug drill pipe, POOH to run 4 1/2"
liner. D1 drill @ 1330 hrs - 2.5 min.
At BHA
Facility
Date/Time
West Beach
17:00-20:00
20:00
20:00-06:00
20:00-22:30
Duration
3 hr
10hr
2-1/2 hr
6 hr
22:30
22:30-04:30
1 hr
27 Nov 98 04:30
04:30-05:30
1/2 hr
1/2 hr
18hr
2 hr
9-1/2 hr
05:30
05:30-06:00
05:30-06:00
06:00-00:00
06:00-08:00
08:00
08:00-17:30
1 hr
17:30
17:30-18:30
1-1/2 hr
18:30
18:30-20:00
4 hr
20:00
20:00-00:00
4-3/4 hr
1-1/4 hr
28 Nov 98 00:00
00:00-04:45
00:00-01:15
1/2 hr
Progress Report
01:15
01:15-01:45
Well WB-05B Page
Rig POOL 7 Date
34
11 August 99
Stopped: To circulate
Circulated at 2510.5 ft
Make up liner hanger / packer and run one stand 4"
DP. circ and clear liner. Liner wt. - 25k.
Broke circulation
Rigged down Casing handling equipment
Change saver sub.
Rigged down Casing handling equipment
Change out saver sub.
Run Liner, 4-1/2in O.D. (cont...)
Rigged down Casing handling equipment (cont...)
Change out saver sub.
Equipment work completed
Ran Liner on landing string to 13750.5 ft
PJSM. RIH w/4 1/2" liner on 4" drill pipe - slow.
Rabbit DP - fill every 10 stands. Spill drill @
1000 hrs - 3.5 min.
Began precautionary measures
Circulated at 13750.5 ft
Circ and clear string @ 7" shoe. String wt. 228k up
and 170K down. Make up cementing head on single.
Broke circulation
Ran Liner on landing string to 16080.5 ft
Run 4 1/2" liner thru open hole to 16,080'. Make up
cementing head.
On bottom
Circulated at 16100.5 ft
Broke circ - washed liner to bottom @ 16,100'. Circ
and condition mud for cement job - recipicate
pipe. Batch mix cement. PJSM.
Obtained req. fluid properties - 300.00 %, hole vol.
Cement: Liner cement
Mixed and pumped slurry - 70.000 bbl
Test lines to 4,500 psi. Howco pumped 20 bbls
water, 50 bbls spacer, 70 bbls slurry @ 15.6 ppg.
Displaced w/rig pump @ 5.5 BPM. Full returns,
recipicated pipe. Bumped plug and set hanger w/
3,400 psi. Shoe @ 16,098'. CIP @ 0115 hrs.
Tail cement pumped
Functioned Casing hanger
Set liner top packer @ 13605' with 4,200 psi.
Floats held. Released running tool. Pulled out of liner
with 1,000 psi. Spud on liner top w/setting tool.
Activity
Pulled BHA
PJSM.LD BHA. Bit 1/8" undergage.
B HA Laid out
Run Liner, 4-1/2in O.D.
Rigged up Casing handling equipment
Rig up to run 4.5" liner.
Equipment work completed
Ran Liner to 2510.5 ft (4-1/2in OD)
PJSM. RIH picking up 60jts 4.5" 13Cr liner. D1
drill @ 2330 hrs - 3 min.
Facility
Date/Time
West Beach
01:45
01:45-04:45
Duration
04:45
04:45-06:00
04:45-06:00
04:45-06:00
06:00-12:00
06:00-07:30
07:30
07:30-08:30
08:30
08:30-09:30
09:30
09:30-12:00
3 hr
1-1/4 hr
1-1/4 hr
1-1/4 hr
6 hr
1-1/2 hr
1 hr
1 hr
12:00
12:00-13:00
12:00-13:00
13:00
13:00-14:00
13:00-14:00
2-1/2 hr
1 hr
1 hr
14:00
14:00-03:00
14:00-15:00
1 hr
1 hr
15:00
15:00-20:00
20:00
20:00-01:45
13hr
1 hr
5 hr
29 Nov 98 01:45
01:45-02:30
5-3/4 hr
02:30
02:30-03:00
03:00
03:00-06:00
3/4 hr
1/2 hr
3 hr
Progress Report
Well WB-05B Page 35
Rig POOL 7 Date 11 August 99
Activity
Equipment work completed
Reverse circulated at 13618.5 ft
Reversed out 10 bbls cement. Circ out long way to
clean up drill pipe. Slug DP - blow down.
Obtained clean returns - 150.00 % hole volume
Pull Drillpipe, 4in O.D.
Pulled Drillpipe in stands to 11000.5 ft
PJSM. POOH with running tool.
Pulled Drillpipe in stands to 11000.5 ft
Start POOH with running tool.
Pull Drillpipe, 4in O.D. (cont...)
Pulled Drillpipe in stands to 6000.5 ft (cont...)
Start POOH with running tool.
Stopped: To service drilling equipment
Serviced Block line
PJSM. Cut drilling line.
Line slipped and cut
Serviced Draw works
Service top drive and drawworks.
Equipment work completed
Pulled Drillpipe in stands to 0.5 ft
POOH with running tool and lay down same. D 1 drill
@ 1000 hrs -3 min.
Completed operations
BHA run no. 21
Rigged up Drillstring handling equipment
RU to handle 2 7/8" drill pipe.
Equipment work completed
Perform integrity test
Tested Liner
Test 4.5" liner top and 7" csg to 3,500 psi for 30
min. - held.
Pressure test completed successfully - 3500.000 psi
BHA run no. 21
Made up BHA no. 21
Make up clean out BHA - 3.75" mill, 2 7/8" motor,
float sub, circ sub, jars, 2 7/8" PAC drill pipe,
7" csg scraper. Surface test.
BHA no. 21 made up
R.I.H. to 2450.5 ft
RIH picking up 78 jts 2 7/8" PAC drillpipe.
Stopped: To change handling equipment
R.I.H. to 15550.5 ft
RIH w/4" drill pipe to 15,550'. D1 drill @ 2200
hrs - 3 min.
Began precautionary measures
Washed to 16010.5 ft
Wash down and tagged up on landing collar. PBTD
16,010'.
On bottom
Circulated at 16010.5 ft
Pump ball down - PJSM for displacement.
Dropped ball
Fluid system
Facility
Date/Time
West Beach
03:00-06:00
03:00-06:00
Duration
3 hr
3 hr
06:00-09:30
06:00-07:00
3-1/2 hr
1 hr
07:00
07:00-09:30
09:30
09:30-03:30
09:30-21:30
2-1/2 hr
18hr
12hr
21:30
21:30-01:00
30 Nov 98 01:00
01:00-01:30
01:30
01:30-03:30
3-1/2 hr
1/2 hr
2 hr
03:30
03:30-05:00
03:30-05:00
1-1/2 hr
1-1/2 hr
05:00
05:00-06:00
05:00-06:00
05:00-06:00
1 hr
1 hr
1 hr
06:00-08:00
06:00-08:00
2 hr
2 hr
08:00
08:00-02:45
08:00-09:00
09:00
09:00-21:30
18-3/4 hr
1 hr
12-1/2 hr
21:30
21:30-22:15
3/4 hr
Progress Report
Well WB-05B Page
Rig POOL 7 Date
36
11 August 99
Activity
Circulated at 16010.5 ft
Finished displacing well with 8.5 ppg sea water.
Circulated at 16010.5 ft
Pump caustic, dirt magnet, and hi-vis pill.
Displace hole with 8.6 ppg sea water.
Fluid system (cont...)
Circulated at 16010.5 ft (cont...)
Pump caustic, dirt magnet, and hi-vis pill.
Displace hole with 8.6 ppg sea water.
Hole displaced with Seawater - 200.00 % displaced
Cleared Trip tank
clean possum bellies and trip tank.
Equipment work completed
BHA run no. 21
Laid down 13600.0 ft of 4in OD drill pipe
POOH laying down 4" drill pipe. LD 7" csg scraper.
Fire drill @ 0900 hrs - 3 min.
Stopped ' To change handling equipment
Laid down 2437.0 ft of 2-7/8in OD drill pipe
LD 2 7/8" drill pipe.
At BHA
Pulled BHA
BHA Laid out
Laid down 2000.0 ft of 4in OD drill pipe
LD 4" drill pipe out of derrick. Changed top rams
to 3.5".
66 joints laid out
Test well control equipment
Tested Top ram
Pulled wear ring and set test plug. Test top rams
to 250 psi / 5,000 psi - leaked.
Well control failed - Change operation
Repair
Repaired Top ram
Change top ram rubbers.
Repaired Top ram
Change wear plate seal and install rams. Test rams
to 250 psi low and 5,000 psi high.
Repair (cont...)
Repaired Top ram (cont...)
Change wear plate seal and install rams. Test rams
to 250 psi low and 5,000 psi high.
Equipment work completed
Run Single completion, 3-1/2in O.D.
Rigged up Tubing handling equipment
Rig up to run tubing. PJSM.
Equipment work completed
Ran Tubing to 11616.5 ft (3-1/2in OD)
RIH Picking up 3.5" completion Assembly o tail
pipe, 7" packer, 8 - GLM's,361 jts - 3.5" 9.3#
L80 tubing.
Stopped · To test equipment
Installed SCSSSV nipple assembly
Make up 3.5" HES saftey vlave - attach control line
test to
- l'~J lIllll,
Facility West Beach
Date/Time
22:15
22:15-01:00
01Dec98 01:00
01:00-02:00
02:00
02:00-02:45
02:45
02:45-06:00
02:45-06:00
02:45-06:00
06:00-06:15
06:00-06:15
06:15
06:15-08:45
06:15-07:45
07:45
07:45-08:45
08:45
08:45-15:00
08:45-15:00
15:00
15:00-20:00
15:00-20:00
20:00
20:00-02:00
20:00-22:00
22:00
Progress Report
Well WB-05B Page 37
Rig POOL7 Date 11 August 99
Duration
Activity
2-3/4 hr
1 hr
3/4 hr
3-1/4 hr
3-1/4 hr
3-1/4 hr
1/4 hr
1/4 hr
2-1/2 hr
1-1/2 hr
1 hr
6-1/4 hr
6-1/4 hr
5 hr
5 hr
6 hr
2 hr
Equipment work completed
Ran Tubing to 13614.5 ft (3-1/2in OD)
Finished running in hole with tubing holding 5500
psi on control line. Tagged up @ 13,614'.
Completed run with Tubing to 13614.5 ft
Installed Other sub-surface equipment
Spaced out tubing string with WLEG 12' inside 4.5"
liner top.
Equipment work completed
Installed Tubing hanger
Make up tubing hanger and landing joint- attach
control line and test to 5,500 psi. Land tubing with
55K on hanger. RILDS.
Tie-down bolts energised
Fluid-system
Circulated at 13609.5 ft
PJSM. Dropped ball and rod.
Circulated at 13609.5 ft
Rig up to reverse circulate - displaced well with
treated sea water.
Fluid system (cont...)
Circulated at 13609.5 ft (cont...)
Rig up to reverse circulate - displaced well with
treated sea water.
Hole displaced with Seawater - 100.00 % displaced
Inhibited sea water.
Perform integrity test
Installed High pressure lines
RU to set packer. Test lines to 3,500 psi.
Equipment work completed
Circulated at 13587.5 ft
Pumped tubing capacity. Ball and rod did not reach
RHC.
String displaced with Seawater - 100.00 % displaced
Slickline wireline work
Conducted slickline operations on Slickline equipment - Tool run
Wait 2 hrs on slick line unit. RU otis. Ran 2.5" OD
impresson block. Tagged ball and rod @ 5,981'
Chased ball and rod to RHC seat. Pressure up to 1,500
psi.
Completed run with Other sub-surface equipment from 0.5 ft to 13.5
Perform integrity test
Set Production packer at 13513.5 ft with 3500.0 psi
Set 7" baker "S-3" packer with 3,500 psi. Held 30
min. for tubing test. Lost 150 psi in 30 min. Test
csg to 3,500 psi for 30 min. Held. Sheared RP
valve. LD landing jt. and set TWCV. Tested from
below to 1,000 psi. Clear rig floor.
Packer set at 13513.5 ft '
Nipple down Top ram
Installed BOP stack
Change top and bottom rams.
Equipment work completed
Facility West Beach
Date/Time
22:00-23:30
23:30
23:30-02:00
02 Dec 98 02:00
02:00-05:00
02:00-04:30
Duration
1-1/2 hr
2-1/2 hr
04:30
04:30-05:00
05:00
05:00-06:00
05:00-06:00
06:00
06:00-06:00
06:00-07:30
3 hr
2-1/2 hr
1/2 hr
1 hr
1 hr
24 hr
07:30
1-1/2 hr
Progress Report
Well WB-05B Page
Rig POOL 7 Date
38
11 August 99
Activity
Installed Top drive
Change out saver sub.
Equipment work completed
Removed BOP stack
ND BOP's.
Equipment work completed
Wellhead work
Installed Xmas tree integral components
NU adaptor flange and tree. Test control line,
adaptor flange, and tbg hanger to 5,000 psi. Test tree
to 5,000 psi.
Eqpt. work completed, running tool retrieved
Retrieved Hanger plug
Pulled TWCV with lubricator.
Equipment work completed
Fluid system
Freeze protect well - 125.000 bbl of Diesel
Freeze protect tubing with 125 bbls diesel
Completed operations
Wellhead work
No accidents or spills.
Installed Hanger plug
Set BPV. Installed gages. Cleaned cellar. Released
rig @ 0730 hrs - 12.2-98.
Equipment work completed
-,~rest Beach 05B Post-Rig Completion ~,~6rk Chronology
ARCO and Exxon request that the information provided below be kept confidential to the fullest extent allowed or required
by law, including AS 31.05.035(d), AS 38.05.035(a)(9) and AS 43.05.230.
The work summarized below has been conducted in accordance with the requirements of AAC 20 25.280 and
consistent with ARCO Alaska, Inc. Prudhoe Bay Unit standard wellwork practices. Detail reports can be furnished
upon request.
Date
12/2/98
12/26/98
2/19/99
2/20/99
2/21/99
2/22/99
2/23/99
2/24/99
2/25/99
2/26/99
2/27/99
2/27/99
2/28/99
3/1/99
3/2/99
Activi .ty Description
Pool 7 released from well and moved to WB-06.
RU Slickline, drift tubing, found ice at 300' worked down to 350'. RDMO.
Additional wellwork suspended on pad until completion of WB-06 and pipeline construction work.
Simultaneous operations unsafe due to limited space on pad.
MIRU coil tubing, jet out ice with 60:40 methanol water, RDMO.
MIRU Slickline, pull tubing tail plug, pull shear valve from stn. 2 at 3702' SLM, run dummy in stn. 2.
RDMO
MIRU coil tubing, record memory gamma ray - cased neutron log from 15,991' (CT TD) to 13,300'
MD. Flag pipe for perforating. Standback for night.
RU coil cubing with TCP firing head and 30' perf gun. Perforate 15,920' to 15,950' MD @ 4 SPF, 180
degree phasing (Schlumberger 2.5" gun with 35B HMX charges), depths reference Schlumberger
MWD/CDR recorded 11/17 thru 11/25/98. Standback unit for night.
RU coil tubing with TCP firing head and 20' perf gun. Perforate 15,900' to 15,920' MD @ 4 SPF, 180
degree phasing (Schlumberger 2.5" gun with 35B HMX charges), depths reference Schlumberger
MWD/CDR recorded 11/17 thru 11/25/98; RDMO.
RU slickline, record static pressure survey (3713 psi @ 8800' SS) and set SSSV isolation sleeve.
RDMO.
RU frac. equipment. Pump 250 bbl. 20 ppt. linear gel system, treating pressure 8000 psi at 11 to 16
bpm. ISIP 4590 psi, excess friction @ 1690 psi. Perforations appear to be very restricted. Pump scour
treatment to open up perforations, consisting of 50 bbls. 1 ppg 20/40 sand, 50 bbls. 2 ppg 20/40 sand in
40 ppt. cross-linked YF100D gel, flushed with 185 ppt. linear gel. Well pressured out @ 8300 psi with
23 bbls of 1 ppg. behind pipe. Bleed off pressure to tank, secure well and rig down frac. equipment.
Total sand pumped = 5500 lbs, 925 lbs. through perfs, 4575 lbs. in wellbore. RDMO.
Rig up coil tubing, jet soft ice at 110'-500', cleanout sand to TD at 16,026' MD. Stand back coil
injector for the night.
RU slickline, pull SSSV isolation sleeve. RDMO
RU coil tubing, attempt to reperforate well, developed leak in pipe at 12000', POOH and stand back
injector for night.
RU coil tubing with TCP firing head and 25' hollow carrier perf gun. Reperforate 15,920' to 15,925'
MD @ 4 SPF, 180 degree phasing (Schlumberger 2.5" gun with 35B HMX charges), ), depths reference
Schlumberger MWD/CDR recorded 11/17 thru 11/25/98; standback unit for night.
RU coil tubing with TCP firing head and 25' hollow carder perf gun. Add perforations from 15,875' to
15,900' MD @ 4 SPF, 180 degree phasing (Schlumberger 2.5" gun with alternating deep penetrating
charges and big hole charges), ), depths reference Schlumberger MWD/CDR recorded 11/17 thru
11/25/98; RDMO.
RU slickline, set SSSV isolation sleeve, RDMO.
Page 1/3
L~rest Beach 05B Post-Rig Completion ',~,.Ork Chronology
ARCO and Exxon request that the information provided below be kept confidential to the fullest extent allowed or required
by law, including AS 31.05.035(d), AS 38.05.035(a)(9) and AS 43.05.230.
3/2/99
3/3/99
3/4/99
5/15/99
7/4/99
7/5/99
7/6/99
7/7/99
7/8/99
7/9/99
7/11/99
7/12/99
7/14/99
RU frac. equipment. Pump breakdown treatment consisting of 100 bbls. 40 ppt. crosslinked gel,
displaced with 265 bbls. 20 ppt. linear gel. Treating pressure 8000 psi at 11 bpm increased to 18 bpm
with crosslinked gel out tubing. No apparent breakdown. Performed step-down test, excess friction at
2300 psi. Perfs. appear to be plugged, plan to pump acid before proceeding with frac. treatment. Freeze
protect wellhead and surface equipment. RDMO.
RU acidizing and frac. equipment. Pumped acid perf wash consisting of 36 bbl 7.5% HC1, 72 bbls. 9:1
Mud Acid, 38 bbls 7.5% HC1, 48 bbls NH4C1, flush with 20 ppt. linear gel, leaving 20 bbls HC1 in
tubing. Final rate 9.2 bpm, 6750 psi. Shutdown for soak, ISIP = 3817 psi. Soaked for 30 minutes,
pumped 5 bbls, shutdown for 30 min. soak, pumped 5 bbls., shutdown for 30 min. soak, pumped 15
bbls gel water to displace remaining acid from wellbore.
Pump breakdown treatment, planned 1000 bbls of 40 ppt. crosslinked gel, pumped only 200 bbls. due to
pump problems. Initial treating pressure 8000 psi at 16 to 20 bpm, dropped to 7500 psi at 17 bpm by
end of treatment.
Pump fracture treatment: pumpeds 1000 bbl. pad; pressure 8000 psi at 25 bpm, dropped rate to 22 bpm
at pressure of 7400 psi; treatment screened out with 1 ppg slurry at perforations. Pumped 12.5M lbs.
20/40, placed 1.2M lbs. Rig down treating equipment, secure well, move off.
MIRU coil tubing for fill cleanout. Cleanout fill from 6400' CTM to 16004' CTM. Freeze protect well,
RDMO.
MIRU slickline. Pull SSSV isolation sleeve, tag proppant at 9098' SLM.
MIRU coil tubing for fill cleanout. Cleanout down to 15,989' CTM, placed 5000' of crude in well;
record memory gamma ray/CCL log, flag pipe in prep. to perforate. Stand back coil for night.
RU for coil conveyed perforating. Perforate 15,820'MD to 15,880' MD with 2.5" hollow carrier guns
loaded 4 SPF, 180 degree phasing (35B charges), depths reference Schlumberger MWD/CDR recorded
11/17 thru 11/25/98. Stand back coil for night.
RU coil and jet out liner to 15,985' CTM. Perform injectivity test and StimTube treatment over
perforations at 15,850' to 15856' ELM. POOH.
Continue pulling out of hole. Left bottom 3' of StimTube in well, push to bottom. Attempt 15'
StimTube treatment of 15835 to 15850' MD, gun did not fire, POOH and rebuild gun.
RIH with 15' StimTube to treat 15,865'MD to 15,880'MD, gun misfired. POOH, rig up 15' StimTube
and treat interval 15,865'MD to 15,880'MD (max. pressure on gauge 25,000 psi); build next 15'
StimTube, RIH, position StimTube to treat 15,835'MD to 15,850'MD, fire gun.
POOH, at surface, lost lower 6' of StimTube (1" pre-drilled pipe), RIH push fish to bottom. Perform
liner and tubing cleanout (some sand in returns), perform injectivity test. RDMO.
MIRU slickline. Set SSSV isolation sleeve. RDMO
RU fracturing equipment. Pump 300 bbl. 20 ppt. linear gel pre-pad at 30 bpm and 9045 psi. Perform
step-down test. Excess friction at 2750 psi, frac. gradient 0.75 psi/ft, ISIP 2800 psi. Pump 400 bbl
breakdown with 40 ppt. crosslinked gel and 1 ppg. 20/40 proppant scour at 30 bpm (ISIP 1926 psi, frac.
gradient 0.65 psi/ft, excess friction 3121 psi), pump 250 bbl. breakdown with 40 ppt. crosslinked gel
and 2.5 ppg 20/40 proppant at 30 bpm (ISIP 2054 psi, frac. gradient 0.67 psi/ft, excess friction 2809
psi); pump data 200 bbl. datafrac at 25 bpm (efficiency 21%, ISIP 1950 psi, frac. gradient 0.65 psi/ft).
Pump hydraulic fracture treatment at 25 bpm utilizing 1200 bbl. 40 ppt. pad, placed 106,846 lbs out of
115,196 lbs. 20/40 ISP proppant pumped with a maximum concentration of 9.7 ppg on formation
(screened out 125 bbls. into 149 bbl. flush). RDMO.
MIRU coil tubing. Cleanout well from 13,986' CTM to 15972' CTM, loaded tubing with crude in prep.
to unload with gas lift. RDMO.
Page 2/3
.... ,.~-~est Beach 05B Post-Rig Completion V~Ork Chronology
ARCO and Exxon request that the information provided below be kept confidential to the fullest extent allowed or required
by law, including AS 31.05.035(d), AS 38.05.035(a)(9) and AS 43.05.230.
7/16/99
7/17/99
7/18/99
7/19/99
7/20/99
7/21/99
7/24/99
.7/26/99
MIRU slickline. Pull SSSV isolation sleeve, record memory static pressure survey (pressure at
8800'SS datum 3663 psi), set catcher sub, LDFN.
Pull DGLVs from stations 5 & 8. LDFN
Continue gas lift valve change-out: pull station 3 & 4 DGLVs and set LGLVs. LDFN.
Continue gas lift valve change-out: set station 5 LGLV, lose station 80GLV attempt to fish, LDFN.
Continue gas lift valve change-out: retrieve OGLV from catcher-sub, place station 4 LGLV. RDMO.
Finish gas lift valve change-out: set station 80GLV (3/8"), pull catcher-sub, RDMO. Turn well over to
production. Attempted to initiate flow, but formed hydrate plug.
MIRU slickline. Tag hydrates at 1077' SLM, remm sample of ice. RDMO.
MIRU coil tubing. Jet ice from 1110' to 2200'CTM, RIH to 13200', kicked well off using nitrogen
flowing to tank on pad. RDMO. Well turned over to Production.
Below is a summary of the well tests for WB-05B:
TEST SEP
DATE LENGTH CHK TEMP FTP SEP PRES OIL W'I'R TOTAL GAS GLG %WC GOR GLR
24-Aug-99 20.1 176 53 615 618 1001 12 4732 3499 1 1232 4671
23-Aug-99 5.0 176 49 612 619 844 1 4358 3499 0 1018 5158
22-Aug-99 12.5 176 49 619 629 879 1 4492 3500 0 1129 5105
17-Aug-99 20.0 176 47 610 606 1129 6 4995 3500 1 1324 4401
16-Aug-99 15.0 176 50 626 621 1152 2 5078 3500 0 1369 4400
15-Aug-99 12.0 176 51 616 616 1182 10 5231 3600 1 1380 4388
07-Aug-99 6.0 176 53 623 622 1423 49 3780 2101 3 1180 2568
06-Aug-99 6.0 176 52 617 614 1516 33 5095 2800 2 1514 3289
04-Aug-99 6.0 176 52 631 629 1554 34 4967 2800 2 1395 3128
04-Aug-99 23.0 176 53 633 631 1614 55 4835 2799 3 1261 2897
02-Aug-99 6.0 176 56 622 619 1657 71 4616 2788 4 1103 2671
02-Aug-99 23.0 150 57 617 615 1686 86 4484 2799 5 999 2530
29-Jul-99 12.0 150 58 629 630 1517 233 2397 1800 13 393 1370
28-Jul-99 4.9 150 53 619 620 1031 447 1582 507 30 1043 1071
26-Jul-99 0.0 104 66 645 627 200 400 2550 2000 67 2750 4250
Page 3/3
Anadriil/Schlumberger Survey Report
WELL INFORMATION
TD Date: 08-Nov-98
Client: ARCO Alaska Inc.
Field: West Beach
Well Name: WB-05B PB1
Permanent datum: Mean Sea Level
Depth measured fi-om: RKB
Elevation of kelly bushing: 0.00
Elevation of rig floor: 52.00
Elevation of grotmd level: 11.50
Magnetic Declination: 28.03
Grid Convergence: 0.00
Total Correction: 28.03
TIE IN POINT
Measured Depth: 0.00
Tree Vertical Depth: 0.00
Inclination: 0.00
Azimuth: 0.00
N/S displacement: 0.00
E/W displacement: 0.00
Azimuth from rotory table to target: 59.7
ORIGINAL
"'SINAL
Measured Incl Azimuth Course TVD
depth angle angle length depth
(ft) (deg) (deg) (ft) (fi)
Vertical Displ Displ Total At DLS
section +N/S- +E/W- displ Azim (degl
(ft) (fi) (ft) (ft) (deg) 1001"1
0.00 0.00 0.00 0.00 0.00 0.00
11.2 0 0 11.2 11.2 0
162.87 0.17 71.9 151.7 162.9 0.22
242.47 0.23 114.2 79.6 242.5 0.43
343.69 0.21 87.2 101.2 343.7 0.71
0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0.07 0.21 0.23 71.9 0.11
0.04 0.47 0.47 85.02 0.19
-0.03 0.84 0.84 92.25 0.1
435.4 0.22 t05.6 91.7 435.4 0.98 -0.07 1.18
524.61 0.33 100.3 89.2 524.6 1.3 -0.16 1.6
614.35 0.57 88.4 89.7 614.29 1.88 -0.2 2.3
703.42 0.43 95.8 89.1 703.39 2.54 -0.22 3.07
792. t 0.37 82 88.7 792.09 3.08 -0.21 3.69
Page I
1.18 93.5 0.08
1.61 95.87 0.13
2.31 94.92 0.29
3.08 94.08 0.17
3.69 93.31 0.13
RECEIVED
DEC 07 1998
Ala a 0it & Gas Cong. Commission
Anchorage
Measured
depth
(ft)
880.26
972.11
1063.27
1157.53
1253.32
1348.12
1439.68
1534.4
1628,92
1720,24
1809.94
1909.12
2000.62
2094.58
2188.93
2272.33
2372.13
2469.97
2559.36
2658.3
2752.22
2846.62
2941,73
3031.07
3130,82
3226.3
3321,31
3416.03
3510,79
3606.02
3700,33
3795,72
3890,02
3984.96
4080.21
Incl
angle
(deg)
0.49
0.65
0.82
1,12
1.38
1.43
1.32
1.48
1.42
1.47
1.56
1.81
2.13
3.21
4.82
5.97
6.65
7.83
9.41
11.46
13.63
16,33
19,46
22.27
25,93
28.77
31.01
33,66
36,77
39.54
41,88
45,3
48,46
50.96
52,83
Azimuth Course 'I'VD
angle length depth
(deg) (ft) (fi)
86,2 88,2 880.29
87.5 91.8 972,08
70.5 91.2 1063,27
60,5 94.2 1157,46
57,9 95,8 1253.24
56.9 94.8 1348,01
57.8 91.6 1439,58
64.6 94,7 1534,25
63.5 94.5 1628.72
64.9 91.3 1719,99
64 89,7 1809,66
64.5 99,2 1908,82
62,6 91,5 2000,27
64.1 94 2094,16
62,2 94,3 2188.23
57.2 83.4 2271.26
56,7 99.8 2370,45
54,3 97,9 2467,57
57.3 89.4 2555.96
61,2 98,9 2653,22
63 93.9 2744,87
62.5 94.4 2836,06
62.8 95.1 2926,54
62,6 89,4 3010,07
63.7 99.7 3101.07
64,3 95.5 3185,88
62.9 95 3268.24
61.7 94.7 3348,25
61,6 94,8 3425,69
58.9 95.2 3500.55
57.5 94.3 3572.03
58.5 95.4 3641.12
57.4 94.3 3705.57
57.4 95 3766.99
57.6 95.2 3825.74
Vertical
section
3,68
4.49
5.59
7.17
9.26
11.58
13.78
16,09
18.47
20,77
23.13
26,04
29,18
33.54
40.14
47,97
58,92
71.23
84,59
102,49
122.87
147,23
176,41
208.2
248,83
292.57
339,8
390,4
445,02
503.82
565,29
631,03
699,82
772,22
847,07
Displ
+N/S-
(ft)
-0,15
-0.1
0.14
0.82
1.89
3.15
4,33
5.44
6,49
7.49
8.51
9.78
11.19
13.14
16.14
20.13
26.11
33.11
40.62
49.72
59,24
70.42
83,83
98,44
116.8
136.02
157.08
180.64
206,6
235.81
268,23
303,07
339.61
378.64
418,89
Displ
+E/W-
(ft)
4.35
5,26
6,39
7.83
9.62
11.58
13.43
15,45
17.6
t9.68
21,82
24,44
27.25
31.17
37,05
43,8
52.99
63,14
74.24
89.66
107.69
129.38
155,33
183,62
219,95
259.38
301,77
346,61
394.71
445.73
497,99
553.77
612,1
673.14
736,32
Total
displ
(ft)
4.35
5,26
6,39
7,87
9.8
12
14.11
16.38
18.76
21.05
23,42
26,33
29,46
33.83
40.42
48,2
59,07
71.3
84,63
102,52
122,91
147.3
176,51
208,34
249,04
292.88
340,21
390,86
445.51
504.27
565,64
631,28
7OO
772,33
847,13
At
Azim
(deg)
91.96
91,09
88.74
84,03
78.87
74.8
72,11
70,6
69,77
69,16
68,69
68,19
67,68
67.14
66.46
65,32
63,77
62.33
61,32
60,99
61,19
61.44
61.64
61,8
62.03
62.33
62,5
62.47
62,37
62,12
61.69
61.31
60.98
60.64
60,36
DLS
(deg/
1000
0.14
0.17
0,3
0.36
0,28
0.06
0.12
0,25
0.07
0.07
0,1
0.25
0.36
1,15
1,71
1.49
0.68
1,24
1.84
2.19
2,35
2,86
3,29
3.14.
3,7
2.99
2.47
2.88
3.28
3,4
2.66
3.66
3,46
2,63
1,97
Page 2
Measured
depth
tnct Azimuth Course TVD
angle angle length depth
(deg) (deg) (ft) Ct)
4174.71 54.24 57.4 94,5
4269.74 56.43 55.5 95
4364.31 58.07 55.6 94.6
4459.04 59.56 55.7 94.7
4548,94 61,77 58.1 89.9
4646.97
4743.28
4837.89
4931,6
5027.75
5121.83
5216.76
5312.37
5407.31
5501.84
5596.58
5687.31
5786.37
5878,07
5975.2
6070.54
6163.94
6254.4
6353.4
6448.75
6543.16
6589.07
6704.89
6799.32
6890.4
6983,O4
7077.14
7172.84
7266.16
7357.53
7450
7541.29
7638.65
7730.32
Vertical
section
ct)
3881..9 923.01
3935.94 1001.01
3987,11 1080.37
4036.t5 1161~18
4080.19 1239.44
65.16
67.46
68.35
68,75
69.22
56.9 98.1
56.7 96.3
57 94.6
56.6 93,7
55.8 96.2
4124.01 1327.13
41.62.7 1415.2
4t98,28 1502.74
4.232.55_ 1589.84
4267.05 1679.47
69.04
68.21
68.23
68.38
67.96
55.6
56~9
58.7
60.1
59.8
94 4300.54 1767.09
95 4335.16 1855.4
9,5.6 4370~64. 1944.12
94.9 4405:72 2032.29
94.5 4440.86 2120.01
68.9
68.27
69.55
70.04
70.46
2
62.4
61.4
60 .,7
60.8
Displ
+N/S-
70.23
70.01
69.84
70.08
69.99
6~.8 .
61.2
63.5
60. i
59.3
459.72
502:92
547.92
593.63
636.41
70.13
70.28
63.71
59,19_
57.41
'58.9
60,7
58.1
56,3
54.4
683.57
731.85
779.78
827.54
877.49
55.81
55.83
56,15
56.35
56.05
53.9
53.3
53.4
52.7
52.2
926.99
976.14
1023,44
1068.33
1112.25
55.17
54.6
54.21
54
54
55.9
55.7
55.3
Displ
+E/W-
(ft)
800.41
865.51
931.12
998
1063.66
'1137.66
1211.44
-t284.83
1357.8
1432.42
1504.98
1578.53
1653.65
1729.55
1805.48
Total
displ
(ft)
923,04
1001.02
1080.37
1161.21
1239.51
1327.23
1415.35
1'502.95-
1590.11
1679.83
1767.56
1855.97
1944.74
2032,89
2120.58
94.8 4475.71- 2208.15 1155.12 1882.51 2208.65
90.7 4508.83 2292.5 1_194,5 1.957.2 2292.92
99.1- 4544:49 2384:89 1238.06 2038.76 2385.23
91.7 4576.16 2470,93 1279.71 2114.06 2471.22
97.1 4608.97 2562.3 1324.37 2193.8 2562.56
95.3 4641~3 265~03
93.4 '4672.79 2739:84
90.5 4703.86 2824.74
· 99 4737.79 2917~7
95.4 4770.36 3007.33
94.4 4802.56 3096:07
45.9 4818.1 3139.26
.
115.8 4863.34 3245.78
94.4 4908~5 3328.59
91.1 4956.32 3405.87
92,6 5007.28 3482.82
94.1 5060.14 3560.23
95.7, 51!3.67 3639.07
93.4 5165.56 3716.21
91.3 5216.35 3791.47
92.5 5268.6 3867.3
91,3_ 5321,.12 3941.72
97.3 ' 5377.76 4020.65
91.7 5431.52 4094.74
2272.14
2348.96
2424.25
2506.2
2583.62
2659.76
2697.09
.2788.8
2858.49
2922.26
2984.93
-3047.58
3111.23
3173.29
3233.44
3294.47
3355.61
-3421.04
3482.26
1368..15
1410:73
1450.18
1494.12
1539.36
1584.93'
1606.65
1660.83
1705.71
1749.76
1795.04
1841,23
1888,59
1935.27
1981.51
2027.34
2070.23
2114.7
2156.78
2652.25
2740:03
2824.89
2917.78
3007.44
3096:18
3139.36
3245.88
3328.73
3406.06
3483.09
3560.6
3639.57
3716.86
3792.3
3868.29
3942.83
4021.88
4096.08
At
Azim
(deg}
60.13
59.84
59.53
59.26
59.11
'59
58.86
58.75
58.64
58.51
58.37
58,27
58.25
58.3
58.37
58.47
58.6
58.73
58.81
58.88
58.95
59.01
59.11
59.2
59.21
59.'21
59.22
59.22
59.17
59.09
58.98
58.86
58.74
58.62
58.5
58.39
58.33
58.28
58.23
DL$
(deg/
1.5
2.83
1.74
t .58
3.38
3.62
2.4
0.99
0.5.8
0.92
0.28
1.55
1.75
1.38
0.53
2~37
0.81
'1.6
0.89
0.44
0.24
0:47
2.39
3.24
0.79
0.43
3.7
6.04
5.O7
2.64
1.79
0.-53
0.35
0.66
0.56
1.87
1.81
0,43
0.42
Page 3
Measured
depth
(ft)
7825.52
7917.52
8011.95
8106,65
8200.96
lncl
angle
(deg)
54.16
54~1
54:52
54.1
53.18
Azimuth Course TVD
angle length, depth
(deg) (ft) (ft)
· 56.2 95.2
55.1 92
54.5 94.4
54.5 94.7
55.7 94.4
8294.47 53.65 55.3 93.5
8389.8 55:15 -55,9 95.3
8484 54.96. 56,7 94..2
8577.9 56.58 57.5 93.9
8671.27 58.84 57,6 93.4
8765.08
8857.62
8949.89
9043.56
9136.82
59.61
60.01
59.86
59.98
60.64
'56.8 93.8
57,1 92,.5
57,5 92.3
56 ~1 93.7
57.6 93.2
9230.89 61.27 56.4 94.1_
9327.26 62.26 55.7 96.4
9422.19 61.7 54.3 .94.9
9517.46 60.04 54.9 95.3
9609.5 60.42 54.8 92
9703.55
9796~3.
9891.51
9985.71
10078.3
61.45
61 ._84_
62.31
61.19
58.19
59.37
60.'71
60.49
57.53
58.81
59.01
56.15
55.87
53.13
53.61
54.53
55.3
54.51
51.83
10173.4
10265.9
10358.6
10451.6
10548.4
10639.4
10734.2
10825.8
10917
11011.9
5487.37
,5541.28
5596.35
5651.6
5707.57
Vertical Displ Displ Total At DLS
section +N/S- +E/W- displ Azim (deg/
(ft) (ft) (ft) (ft) (deg) 100f)
417-i .65
4246,02
4322.41
4399,01
4474.78
5763.29. 4549~6
5818.77 4626.95
5872.73. 4704,03
-5925.55 4781.58
5975.44 4860.47
11105.7
11200.2
11295.8
11391.4
6023;43
6069.95
6116.19
6!63.15
6209.32
4940.99
5020.~85
5100~6
5181.63,
5262.5
6255 5344.67
6300.61 5429.43
6345.19_ 551Z92
6391.58' 5595;83
6437.26 5675.4
54,6 94.1
54.3 92.8
55 ' 95.1
54.2 94.2
55.5 92.6
2200,17
2242.23
2286.43
2331.09
2374.59
55.5 95J
55.5 92.5
55.2 92.7
56 93
56.6 96.8
3545.99 4173.1
3607.54 4247.58
3670.19 4324.12
3732.81 4400.89
3795.15 4476.81
55.7 90.9
57.3 94.9
56.9 91.6
56.6 91.2
58.2 94.9
58.18
58.14
58.08
58.O2
57.97
56.9 93.7
56.4 94.6
55 95~
56 95.6
2417.11 3857.02 4551.82 57.93
2460.89 3920.96 4629.24 57.89
2503.73 3985.2 4706.43 57.86
2545,89 .4050.38 4784.05 57.85
2588.25 4117.01 4863 57.84
'2631.91'
2675.52
2718.67.
2763.07
2807.34
2852.14
2899.57
2947,62
2995.84
3041.82
6482.98 5757.34 3089.35
6527~5 5838.67 3136.83
6571.59 5922:37 ·3185.45
6616.17 6005.02 3233.51
6662.9 6084.66 3279.54
3325.6
3370.99
3416.91
3461.95
3507.58
3550.94
3595.17
3636.42
3677.12
3718.15
6712,2 6165.77
6758~39- 624'5.69
6803.9 6326.22
6851,77- 6405~73
6902.83 6487.83
4184.75 4943.59
4251.76 5023.53
4318.98 5103,41
4386.83 5184.48
4454.61 5265.43
57.83
57.82
57.81
57.8
57.78
4523.6 5347.68 57.77
4594.05 5432,57 57.74
4662.68 5516.25 57.7
4730.53 5599:37 '57.65
4795.82 5679.14 57.61
4862.95 5761.28
4929.39 5842.83
4997.93 5926.75
5065.57 6009.62
5130.91 6089.47
5!97.94 6170.75
5263.98 6250.85
5330.42 6331.56
5396.19 641t.24
5464.61 6493.47
- 6949.77 '6565.52
7000.64 6645.5
705.1.85 6721.36
710481_ 6795.51
7161.43 6871.6
5529.26 6571:29
5596.04 6651.38
5659.81 6727.33
5721.89 6801.56
5786.05 6877.72
7216.41 6947.42 3758.86 5850.07 6953.59
7270~79 ~7024.72 .3801.42 5914.73 7030.99
7325.75_ 7102.74 ~845.49 5979.35 7109.1,8
7383.06 7179.05 3888.84 6042.4 7185.65
57.57
57.53
57.49
57.45
57.41
57.39
57.36
57.34
57.32
57.3
57.29
57.28.
57.28
57.27
57.27
57.28
57.27
57.25
57.24
0.78
0.97
0.68
0.44
1.41
0.61
1.66
0.72
1.86
2.42
1.1
0.52
0.41
1~3
1.57
1.3
1,21
1.43
1.83
0.42
1.11
0.51
0.82
1.4
3.46
1.24
1.45
0.37
3-.27
1.42
0.88
3.33
0.47
3.02
1.44
1.49
0.92
1.46
2.93
Page 4
~ a6ed
69'1,
9t"g
Z.O'g
~9'0
9~'Z
g~'O
CJ9'O
I,g'O
CJ9'O
!,6'0
69'0
cjl.'g
69'1,
99'0
1,
99'~
cjo'o
90'1,
I,'1,
Li,'l,
l~g"l,
69'1,
99'0
gE: 1,
~'0
CJg'O
i,g' I,
99'0
~'~7' I,
gl'O
cj1,'9cj
91,'9cj
91,'9cj
91,'9cj
' ~E'9cj
g~'9cj
cjg:'9cj
g'9cj
9g'9cj
9g'9cj
~9'9c_;
§9'99
9'9~
~cj~9g
99'99
;~9'99
99'99
1,L"gg
gl'gcj
~:9'99
Lg'9g
:~6'gcj
96'99
izO'LCj
gO'Lcj
1, l.'LCj
91,'L9
91,'LCj
61,'LCj
~g'Z.g
1,~'gLg6
£gg6
gg'~l, g6
g/'gg~6
Z.£ 1,91,6
gl,'ggl, 6
~0'01,1,6
g~'~g06
L'~§69
' gO'LLgg
g9'oogg
LL'g~Lg
~9'0999
KL'OLgg
~9'96tg
6~'Lggg
6K'6g~g
6g'1,g~g
6'6609
g'gzog
Lg'g96L
9L'~6LL-
69'9~LL
g~'gggL
g9'~gBz
90'gggz
gg'g9~z
9L'ggzL
gb'1,Lgz
90'91,9Z
90'969£
g9'g~g I.g'09g6 1.9'9699
ax o~ pei3e.l'oJd .
- 1,~'OOZ:S ~'61,96 6Z.'sggg
~9'991,g -98'96~6 6'9989
. ;~l.'6gl. cj 99'91.Z6 gZ:'96L9
9 6 0'cj Cj6'HZ 1,6 '~'69Z.9
gl.'~.LOCj ' 9'6 I, 1,6 61z'~gLg
CjL'9Lcj/_ 61,' 1,90CJ
66:gl, 9Z CJ I,:~'I, OCJ-
~; i,'gcjgz 'cjg'g96]z
96' 1,6gL 'lzg'cj 1,6'1z
gcj' 1,ggL l ~'ggg9
9'g606
6g'.91,06
9g'6969
9z'zggg
CJ~:'ggLg
90'g~zg
z'~ggg
-01,99
~9'gcjcjg
-9'~OCJg
1,9'ZLZZ 96'1,~99
-1,t'Ocj1,£-gS'CJZL~
LO'O60Z Z9'BZ99
~g'LZOL 99'0999
99'1,1,zg
6~'Lgg9
gz'-Lcjgg
1,'~999
gO"lz09g
99'9999
9£96g9
61,'g~gg'
90~96~9
6g:6gzg
L~'gg6g 69'1,999
99"£069 ZL'ggcj~
69'~999 9~'CJ999
g6:gLLg cjg'£g91z
CJCJ'61,Z9' 6~cj999
90'g~gg
g6'OL~g
i'6gog
60'~09
LL'Lgl, g
cjo'6g 1,9'
. .
Z6'6909
CJg'gsog
L'gcjgg ~'Lgg9
LCJ'6699 66;~6E9
L9'gL~9-96'Z6~9
96'~L99 6g'ocj1,~
6g'Lg6Z
~g'gggz
g1,'ggzz
gg'osgz
gg'og6L
9£1,ZLL
Z'OCJgg gg'go~9 CJCJCJZ 6z'gggz
£o'gg~g 9~'~909 ~g'gzgz- ~6'609Z-
96'9~Z9 'gcj'Z1,09" ~09Z Zg'g~gL
g'ggLg gg'gi6g CJ'9~SL 9fz'i69L'
99'K0~9 69'6~69 ~9'1,gKi 99'699L
(,1001, (§ap) (U) (U) (U) (U) (U)
/6ap) m!zv Ids!p -NV~]+ -S/N+ uo!~oes q~dep
S'IQ W It:qOl lds!o . lds!o !t,3!.ueA. OA1
9'0CJ gcj 9'9CJ
~'6~ t'SS 1,'SS
1,'99 Z'~CJ CJO:LCJ
9'0~ ~G CJ~L9
S'~g g'Og gg'gg
96
L'g6
LZ6
cj'o~o91,
E6
6'96
g'1,6
I.'CJ6
Z'tz6
I,'01,09!,
9'09691,
cj'cjggg1,
9'66/gl.
g'gg/_g ~
L'Z:6
1,'~6
'96
g'~6 ·
'cj"178
g'OCJ 9g'9cj 1,'LSLgL
9'1,S 66'CJCJ 1,'999g1,
6'Lg 9'9CJ 1,ggg~
L'ZCJ 69'gcj g'ggzg~
9'Zg go'L9 9'ogogL
1,'~9 ~g'99 1,'696~L
9'~9 . ~'CJg.
l.g
Z'OCj
' !.'1.9
60'9CJ
90'gg
gcj'LCJ
~9'gcj
9'06 g'Z:CJ
-9'96 /_..'Zg
L'g6.
6'CJ6 9'ZcJ
g'Z6 g'sg
gcj'gg
Z6'CJ9
zg'GCJ
Z.'g6 9't'cj
CJ'96 g'gcj
Z'~'6 i.'t,,cj
/..' iz6 I. 'gcj
g;Z6 g'Gcj
gg'CJCJ
99'99
~9'g'9
gg'~'9
I.Z'~CJ
(U) (§ep) (§ap)
q~§uel eiBu~ alBUe
asJnoo qmm!zv. !3u!
g'66ZZ1,
~'LOZ~1,
L'L~CJ~L
g'OSg~L
Z'6g~L
090Z1,
g'Lgg~
~'ggz~
9'~zg~
(u)
q~dep
pe~nsee~
Anadrill ~
Alaska - Prudhoe Bay
o'o SV'~ Pouch 340130
Prudhoe Bay, AK 99734
(907)659-2487
Date:
Well Name:
Company:
API Number:
Location:
Field:
Anadrill Personnel
16-Nov-98
WB-05B PB2
ARCO Alaska Inc.
500292281702
North Slope, Alaska
West Beach
Pool A~c~c AI~ 7
Field Crew:
Cell Managers:
Cell Engineers:
LWD Engineers:
Mark St. Amour
Nathan Rose
Ray Whimlm
Dan Guay
Mark St. Amour
Field Support:
Alaska District Manager: Martin Varco
Field Service Manager: Joey LeBlanc
SERVICES PROVIDED
Service
Impulse/IAB
OPERATING STATISTICS
Total MWD Pumping Hours:
Total MWD Below Rotary Hours:
Total MWD Footage:
Total MWD Runs:
Total LWD Pumping Hours:
Total LWD Below Rotary Hours:
Total LWD Footage IMP/IAB:
Total LWD Runs: IMP/IAB:
Service Dates
10 Nov-98 - 16 Nov-98
99.6
145.25
1164
4
99.6
145.25
1162
4
Depth Interval
13807' - 14971'
ORIGINAL
R= iVED
DEC 0 7 1998
Alaska Oil & Gas Cons. Commission
Anchorage
JOB PERFORMANCE
DIREC~ON~
Surveys (DSS) were provided over the entire well. The final survey point was at 14902.81' with an
inclination of 95.15 degrees and an azimuth of 78.7 degrees. This survey was projected to TD, giving the
final bottom hole location:
Measured Depth: 14971' Tree Vertical Depth: 8781.13'
Latitude: 5416.82 N Departure: 8717.97 E
Displacement at Azimuth: 10263.77' at 58.15 deg
FORMATION EVALUATION
Real-time GR and Resistivity was used for lithology identification; specifically, to evaluate the zone of
interest. Impulse and Inclination at Bit tools were used the entire section. Real-time logs, DLIS files and
ASCII data were faxed/mailed in a timely manner. Inclination at bit was used for directional control while
searching for the zone of interest.
DRILLING MECHANICS
The downhole measurements were monitored by the driller on the rig floor, as well as the Anadrill
engineer on location. Inclination at the Bit enabled the geologist to minimize their time out of the zone
of interest.
SHOCK
Shock is monitored in the Impulse, it remained low most of the well.
WASHOUT DETECTION
Washouts can be seen from MWD turbine rpm, pump pressure, and flow. There were no washouts.
LESSONS LEARNED
Pulsation dampeners at the shallow hole test should be checked. Deflating the pulsation dampeners
sometimes helps to acquire a good shallow hole due to Iow pressures.
Anadrill appreciates the oppommity to provide BP Exploration and Shared Services Drilling with MWD
and LWD se~x'ices.
Sincerely,
Joey Leblanc
Field Service Manager
Nate Rose
Field Cell Manager
Anadrill/Schlumberger Survey Report
WELL IN?ORMA TION
TD Date: 16-Nov-98
Client: ARCO Alaska Inc.
Field: West Beach
Well Name: WB-05B PB2
Permanent datum: Mean Sea Level
Depth measured from: RKB
Elevation of kelly bushing: 0.00
Elevation of rig floor: 52.00
Elevation of ground level: 11.50
Magnetic Declination: 28.03
Grid Convergence: 0.00
Total Correction: 28.03
TIE IN POINT
Measured Depth: 13799.38
Tree Vertical Depth: 8749.40
Inclination: 57.05
Azimuth: 51.00
N/S displacement: 5095.00
E/W displacement: 7615.06
Azimuth from rotory table to target: 59.7
Measured Incl Azimuth Course TVD Vertical
depth angle angle length depth section
(ft) (deg) (deg) (ft) (ft) (ft)
13799.38 57.05 51.00 0.00 8749.40
13809.00 57.05 51.00 9.60 8754.62
13828.18 61.74 51.90 19.20 8764.39
13852.99 71.08 52.90 24.80 8774.31
13886.75 82.05 54.40 33.70 8782.13
13920.43 86.15 54.90 33.70 8785.59
13947.43 87.29 56.80 27.00 8787.14
13982.64 88.42 61.60 35.20 8788.45
14014.04 88.42 65.70 31.40 8789.32
14046.74 87.15 69.50 32.70 8790.58
Displ
+N/S-
(ft)
9145.38 5095.00
9153.34 5100.07
9169.69 5110.36
9192.21 5124.21
9224.75 5143.60
9258.14 5162.99
9285.03 5178.12
9320.20 5196.12
9351.50 5210.05
9383.86 5222.50
Displ
+E/W-
(ft)
7615.06
7621.32
7634.24
7652.23
7678.60
7705.93
7728.24
7758.44
7786.57
7816.77
Total
displ
m)
9162.32
9170.34
9186.81
9209.46
9242.16
9275.66
9302.61
9337.73
9368.84
9400.87
Azim
(deg)
56.21
56.21
56.20
56.19
56.18
56.18
56.18
56.19
56.21
56.25
DLS
(deg/
1000
0.00
0.00
24.76
37.84
32.84
12.26
8.20
14.00
13.05
12.24
Survey
Type
TIP
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Page 1
Measured Incl
depth angle
(ft) (deg)
Azimuth Course TVD
angle length depth
(deg) (ft) (ft)
14077.25 86.98 73.30 30.50 8792.15
14143.04 87.25 73.90 65.80 8795.46
14237.13 87.19 75.30 94.10 8800.02
14303.29 85.54 80.70 66.20 8804.22
14332.39 86.61 80.10 29.10 8806.22
14361.71 90.00 81.10 29.30 8807.08
14394.76 93.98 79.80 33.10 8805.93
14431.07 94.05 78.80 36.30 8803.39
14468.62 93.64 78.70 37.50 8800.88
14499.07 93.33 78.40 30.50 8799.02
14530.61 93.47 78.20 31.50 8797.15
14566.81 93.15 77.10 36.20 8795.06
14597.15 90.17 79.10 30.40 8794.18
14624.38 89.76 79.00 27.20 8794.20
14659.36 88.97 78.50 35.00 8794.59
14691.97 89.07 77.90 32.60 8795.14
14718.94 89.18 79.60 26.90 8795.56
14751.14 90.86 78.50 32.20 8795.54
14782.93 90.48 77.10 31.80 8795.17
14808.16 92.33 79.80 25.30 8794.55
14849.88 94.94 79.10
14882.20 95.08 79.00
14902.81 95.15 78.70
ProjectedSurveytoTD
14971.00 95.15 78.70
41.70 8791.91
32.30 8789.09
20.60 8787.25
68.20 8781.13
Vertical Displ Displ Total At DLS
section +N/S- +E/W- displ Azim (deg/
(ft) (ft) (ft) (fl) (deg) 100f)
9413.68 5232.22 7845.63 9430.27
9477.47 5250.77 7908.68 9493.04
9568.30 5275.73 7999.29 9582.38
9631.00 5289.46 8063.88 9643.89
9658.16 5294.30 8092.51 9670.49
9685.51 5299.09 8121.40 9697.29
9716.44 5304.57 8154.01 9727.61
9750.55 5311.30 8189.59 9761.11
9785.92 5318.59 8226.29 9795.88
9814.73 5324.64 8256.13 9824.23
9844.53 5331.01 8286.92- 9853.57
9878.91 5338.74 8322.22 9887.44
9907.74 5345.01 8351.95 9915.86
9933.41 5350.18 8378.66 9941.14
9966.49 5357.00 8412.98 9973.75
9997.40 5363.67
10022.82 5368.92
10053.20 5375.03
10083.42 5381.75
10107.37 5386.81
10146.54 5394.43
10176.89 5400.55
10196.28 5404.51
10260.50 5417.82
8444.89 10004.25
8471.27 10029.34
8502.88 10059.32
8533.96 10089.19
8558.74 10112.85
8599.64 10151.54
8631.24 10181.56
8651.37 10200.73
8717.97 10264.30
56.30
56.42
56.59
56.74
56.81
56.88
56.95
57.03
57.12
57.18
57.25
57.32
57.38
57.44
57.51
57.58
57.63
57.70
57.76
57.81
57.90
57.97
58.01
58.14
12.46
1.00
1.49
8.51
4.21
12.06
12.65
2.75
1.13
1.41
0.77
3.16
11.80
1.55
2.67
1.87
6.33
6.24
4.56
12.93
6.48
0.53
1.49
0.00
Survey
Type
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD.
MWD
MWD
MWD
MWD
MWD
MWD'
MWD
Projected
Page 2
Anaddll
(907) 65~.2487
Date:
Well Name:
Company:
API Number:
Location:
Field:
Rig:
27-Nov-98 ~
WB-05B
ARCO Ala~_4ca Inc.
500292281702
North Slope, Alaska__
West Beach
Pool Arctic Alaska_ 7
Anadrill Personnel
Field Crew:
Cell Managers:
Cell Engineers:
LWD Engineers:
Nathan Rose
Dan Guay
Ray Whitmm
Nat~n Rose
Field Support:
Alaska District Manager: Martin Varco
Field Service Manager: Joey LeBlanc
SERVICES PROVIDED
Service
Directional Survey Service (DSS)
DWOB/DTOR (IWOB)
Gamma Ray (GR)
Compensated Dual Resistivity (CDR)
Pressure While Drilling (PWD)
Impulse/IAB
Service Dates
16 Oct-98 - 08 Nov-98
16 Oct-98 - 24 Oct-98
16 Oct-98 - 24 Oct-98
16-Oct-98 - 24 Oct-98
10-Apr-98 - 24 Oct-98
10 Nov-98 - 26 Nov-98
OPERATING STATISTICS
Total MWD Pumping Hours:
Total MWD Below Rotary Hours:
Total MWD Footage:
Total MWD Runs:
349.5
501
9511
7
Total LWD Pumping Hours:
Total LWD Below Rotary Hours:
Total LWD Footage CDR:
Total LWD Runs: CDR:
Total LWD Footage IMP:
Total LWD Runs: IMP:
Total LWD Footage IM~:
Total LWD Runs: IMP/IAB:
349.5
501
7220
1
78
1
2213
5
Depth lntervfl
6589' -13809'
6589' -13809'
6589' -13809'
6589' -13809'
6589' -13809'
13809' -16100'
ORI$1NAL
JOB PERFORMANCE
DIRECTIONAL
Surveys (DSS) were provided over the entire well. The final survey point was at 16043.96' with an
inclination of 74.80 degrees and an azimuth of 80.7 degrees. This survey was projected to TD, giving the
final bottom hole location:
Measured Depth: 16100' True Vertical Depth: 8931.01'
Latitude: 5603.54 N Departure: 9821.10 E
Displacement at Azimuth: 11307.2' at 60.29 deg
FORMATION EVALUATION
Real-time GR and Resistivity was used for lithology identification; specifically, to evaluate the zone of
interest. Impulse and Inclination at Bit tools were used the entire section. Real-time logs, DLIS files and
ASCII data were faxed/mailed in a timely manner. Inclination at bit was used for directional control while
searching for the zone of interest.
DRILLING MECHANICS
The downhole measurements were monitored by the driller on the rig floor, as well as the Anadrill
engineer on location. Inclination at the Bit enabled the geologist to minimize their time out of the zone
of interest and helped to control the path of the well.
SHOCK
Shock is monitored in the Impulse, it remained low most of the well.
WASHOUT DETECTION
Washouts can be seen from MWD turbine rpm, pump pressure, and flow. There were no washouts.
EXPLANATION OF PLUG BACKS
WB-05B consisted of two plug backs. PB 1 consisted of MWD runs 1 and 2. The well PB2, was then
drilled out of the shoe at 13807 ft and drilled to 14971 It, with ~ runs 3,4,5, and 6. WB-05B was
open hole sidetracked at 14721', and achieved a TD of 16100' with MWD runs 1,3,4,5,7,11 and 12.
LESSONS LEARNED
Pulsation dampeners at the shallow hole test should be checked. Deflating the pulsation dampeners
sometimes helps to acquire a good shallow hole due to low pressures. Inclination at the bit compares very
close to survey inclinations at the same depths. This helps to minimi?e the amount of sliding.
Anadrill appreciates the opportunity to provide BP Exploration and Shared Services Drilling with MWD
and LWD services.
Sincerely,
Joey Leblanc
Field Service Manager
Nathan Rose
Field Cell Ma_nager
WELL INFORMA T/ON
TD Date:
Client:
Field:
Well Name:
Permanent datum:
Depth measured from:
Elevation of kelly bushing:
Elevation of rig floor:
Elevation of ground level:
Magnetic Declination:
Grid Convergence:
Total Correction:
TIE IN POINT
Measured Depth:
Tree Vertical Depth:
Inclination:
Azimuth:
N/S displacement:
E/W displacement:
Azimuth from rotory table to target:
Anadrill/Schlumberger Survey Report
26 November 1998
ARCO Alaska Inc.
West Beach
WB-05B
Mean Sea Level
0.00
52.00
11.50
28.03
0.00
28.03
0.00
0.00
0.00
0.00
0.00
0.00
59.7
Measured Incl Azimuth Course TVD
depth angle angle length depth
(ft) (deg) (deg) (ft) (it)
0.00 0.00 0.00 0.00 0.00
11.20 0.00 0.00 11.20 11.20
162.87 0.17 71.90 151.70 162.90
242.47 0.23 114.20 79.60 242.50
343.69 0.21 87.20 101.20 343.70
435.40 0.22 105.60 91.70 435.40
524.61 0.33 100.30 89.20 524.60
614.35 0.57 88.40 89.70 614.29
703.42 0.43 95.80 89.10 703.39
792.10 0.37 82.00 88.70 792.09
Vertical
section
(ft)
0.00
0.00
0.22
0.43
0.71
0.98
1.30
1.88
2.54
3.08
Displ
+N/S-
(ft)
0.00
0.00
0.07
0.04
-0.03
-0.07
-0.16
-0.20
-0.22
-0.21
Displ
+E/W-
(It)
0.00
0.00
0.21
0.47
O.84
1.18
1.60
2.30
3.07
3.69
Total
displ
(ft)
0.00
0.00
0.23
0.47
0.84
1.18
1.61
2.31
3.08
3.69
At
Azim
(deg)
0.00
0.00
71.90
85.02
92.25
93.5O
95.87
94.92
94.08
93.31
DLS
(deg/
1000
0.00
0.00
0.11
0.19
0.10
0.08
0.13
0.29
0.17
0.13
Survey
Type
TIP
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
Page 1
Measured
depth
(ft)
880.26
972.11
1063.27
1157.53
1253.32
1348.12
1439.68
1534.40
1628.92
1720.24
1809.94
1909.12
2000.62
2094.58
2188.93
2272.33
2372.13
2469.97
2559.36
2658.30
Incl
angle
(deg)
Azimuth Course 'I'VD
angle length depth
(deg) (ft) (ft)
0.49 86,20 88.20 880.29
0.65 87.50 91.80 972.08
0.82 70.50 91.20 1063.27
1.12 60.50 94.20 1157.46
1.38 57.90 95.80 1253.24
Vertical
section
(ft)
3.68
4.49
5.59
7.17
9.26
1.43 56.90 94.80 1348.01 11.58
1.32 57.80 91.60 1439.58 13,78
1.48 64.60 94.70 1534.25 16.09
1.42 63.50 94.50 1628.72 18.47
1.47 64.90 91.30 1719.99 20.77
1.56
1.81
2.13
3.21
4.82
64.00 89.70 1809.66
64.50 99.20 1908.82
62.60 91.50 2000.27
64.10 94.00 2094.16
62.20 94.30 2188.23
23.13
26.04
29.18
33.54
40.14
5.97 57.20 83.40 2271.26 47.97
6.65 56.70 99.80 2370.45 58.92
7.83 54.30 97.90 2467.57 71.23
9.41 57.30 89.40 2555.96 84.59
11.46 61.20 98.90 2653.22 102.49
2752.22 13.63 63.00 93.90 2744.87 122.87
2846.62 16.33 62.50 94.40 2836.06 147.23
2941.73 19.46 62.80 95.10 2926.54 176.41
3031.07 22.27 62.60 89.40 3010.07 208.20
3130.82 25.93 63.70 99.70 3101.07 248.83
28.77 64.30 95.50 3185.88 292.57
31.01 62.90 95.00 3268.24 339.80
33.66 61.70 94.70 3348.25 390.40
36.77 61.60 94.80 3425.69 445.02
39.54 58.90 95.20 3500.55 503.82
3226.30
3321.31
3416.03
3510.79
3606.02
Displ
+N/S-
(ft)
-0.15
-0.10
0.14
0.82
1.89
3.15
4.33
5.44
6.49
7.49
8.51
9.78
11.19
13.14
16.14
20.13
26.11
33.11
40.62
49.72
Displ
+E/VV-
4.35
5.26
6.39
7.83
9.62
11.58
13.43
15.45
17.60
19.68
21.82
24.44
27.25
31.17
37.05
Total
displ
(fi)
4.35
5.26
6.39
7.87
9.80
At' DLS Survey
Azim (degl Type
(deg) 100f)
91.96
91.09
88.74
84.03
78.87
0.14 GYRO
0.17 GYRO
0.30 GYRO
0.36 GYRO
0.28 GYRO
12.00 74.80 0.06 GYRO
14.11 72,11 0.12 GYRO
16.38 70.60 0.25 GYRO
18.76 69.77 0.07 GYRO
21.05 69.16 0.07 GYRO
68.69
68.19
67.68
67.14
66.46
23.42
26.33
29.46
33.83
40.42
0.10 GYRO
0.25 GYRO
0.36 GYRO
1.15 GYRO
1.71 GYRO
43.80 48.20 65.32 1.49 GYRO
52.99 59.07 63.77 0.68 GYRO
63.14 71.30 62.33 1.24 GYRO
74.24 84.63 61.32 1.84 GYRO
89.66 102.52 60.99 2.19 GYRO
59.24 107.69 122.91 61.19 2.35 GYRO
70.42 129.38 147.30 61.44 2.86 GYRO
83.83 155.33 176.51 61.64 3.29 GYRO
98.44 183.62 208.34 61.80 3.14 GYRO
116.80 219.95 249.04 62.03 3.70 GYRO
292.88
340.21
390.86
445.51
504.27
62.33
62.50
62.47
62.37
62.12
136.02
157.08
180.64
206.60
235.81
259.38
301.77
346.61
394.71
445.73
3700.33 41.88 57.50 94.30 3572.03 565.29 268.23 497.99 565,64 61.69
3795.72 45.30 58.50 95.40 3641.12 631.03 303.07 553.77 631.28 61.31
3890.02 48.46 57.40 94.30 3705.57 699.82 339.61 612.10 700.00 60.98
3984.96 50.96 57.40 95.00 3766.99 772.22 378.64 673.14 772.33 60.64
4080.21 52.83 57.60 95.20 3825.74 847.07 418.89 736.32 847.13 60.36
4174.71 54.24 57.40 94.50 3881.90 923.01 459.72 800.41 923.04 60.13
4269.74 56.43 55.50 95.00 3935.94 1001.01 502.92 865.51 1001.02 59.84
4364.31 58.07 55.60 94.60 3987.11 1080.37 547.92 931.12 1080.37 59.53
4459.04 59.56 55.70 94.70 4038.15 1161.18 593.63 998.00 1161.21 59.26
2.99 GYRO
2.47 GYRO
2.88 GYRO
3.28 GYRO
3.40 GYRO
2.66 GYRO
3.66 GYRO
3.46 GYRO
2.63 GYRO
1.97 GYRO
1.50 GYRO
2.83 GYRO
1.74 GYRO
1.58 GYRO
Page 2
Measured lncl Azimuth Course TVD Vertical Displ Displ Total At' DLS Survey
depth angle angle length depth section +N/S- +E/W- displ Azim (degl Type
(ft) (deg) (deg) (ft) (ft) (ft) (It) (It) (It) (deg)
4548.94 61.77 58.10 89,90 4080.19 1239.44 636.41 1063.66 1239.51 59.11 3,38 GYRO
4646.97 65.16 56.90 98.10 4124.01 1327.13 683.57 1137.66 1327.23 59,00 3,62 GYRO
4743.28 67.46 56.70 96.30 4162.70 1415.20 731.85 1211.44 1415.35 58.86 2,40 GYRO
4837.89 68.35 57.00 94.60 4198.28 1502.74 779.78 1284.83 1502.95 58.75 0.99 GYRO
4931.60 68.75 56.60 93.70 4232.55 1589.84 827.54 1357.80 1590.11 58.64 0,58 GYRO
5027.75 69.22 55.80 96.20 4267.05 1679.47 877.49 1432.42 1679.83 58.51 0,92 GYRO
5121.83 69.04 55.60 94.00 4300.54 1767.09 926.99 1504.98 1767.56 58.37 0,28 GYRO
5216.76 68.21 56.90 95.00 4335.16 1855.40 976.14 1578.53 1855.97 58.27 1.55 GYRO
5312.37 68.23 58.70 95.60 4370.64 1944.12 1023.44 1653.65 1944.74 58.25 1.75 GYRO
5407.31 68.38 60.10 94.90 4405.72 2032.29 1068.33 1729.55 2032.89 58.30 1.38 GYRO
5501.84 67.96 59.80 94.50 4440.86 2120.01 1112.25 1805.48 2120.58 58.37 0.53 GYRO
5596.58 68.90 62.00 94.80 4475.71 2208.15 1155.12 1882.51 2208.65 58.47 2.37 GYRO
5687.31 68.27 62.40 90.70 4508.83 2292.50 1194.50 1957.20 2292.92 58.60 0.81 GYRO
5786.37 69.55 61.40 99.10 4544.49 2384.89 1238.06 2038.76 2385.23 58.73 1.60 GYRO
5878.07 70.04 60.70 91.70 4576.16 2470.93 1279.71 2114.06 2471.22 58.81 0.89 GYRO
5975.20 70.46 60.80 97.10 4608.97 2562.30 1324.37 2193.80 2562.56 58.88 0.44 GYRO
6070.54 70.23 60.80 95.30 4641.03 2652.03 1368.15 2272.14 2652.25 58.95 0.24 GYRO
6163.94 70,01 61.20 93.40 4672.79 2739.84 1410.73 2348.96 2740.03 59.01 0.47 GYRO
6254.40 69.84 63.50 90.50 4703.86 2824.74 1450.18 2424.25 2824.89 59.11 2.39 GYRO
6353.40 70.08 60.10 99.00 4737.79 2917.67 1494.12 2506.20 2917.78 59.20 3.24 GYRO
6448.75 69.99 59.30 95.40 4770.36 3007.33 1539.36 2583.62 3007.44 59.21 0.79 GYRO
6543.16 70.13 58.90 94.40 4802.56 3096.07 1584.93 2659.76 3096.18 59.21 0.43 GYRO
6589.07 70.28 60.70 45.90 4818.10 3139.26 1606.65 2697.09 3139.36 59.22 3,70 GYRO
6704,89 63.71 58.10 115.80 4863.34 3245.78 1660.83 2788.80 3245.88 59.22 6.04 GYRO
6799.32 59.19 56.30 94.40 4908.45 3328.59 1705.71 2858.49 3328.73 59.17 5,07 GYRO
6890.40 57.41 54.40 91.10 4956.32 3405.87 1749.76 2922.26 3406.06 59.09 2.64 MWD
6983.04 55.81 53.90 92.60 5007.28 3482.82 1795.04 2984.93 3483.09 58.98 1.79 MWD
7077.14 55.83 53.30 94.10 5060.14 3560.23 1841.23 3047.58 3560.60 58.86 0.53 MWD
7172.84 56.15 53.40 95.70 5113.67 3639.07 1888.59 3111.23 3639.57 58.74 0.35 MWD
7266.16 56.35 52.70 93.40 5165.56 3716.21 1935.27 3173.29 3716.86 58.62 0.66 MWD
7357.53 56.05 52.20 91.30 5216.35 3791.47 1981.51 3233.44 3792.30 58.50 0.56 MWD
7450.00 55.17 54.00 92.50 5268.60 3867.30 2027.34 3294.47 3868.29 58.39 1.87 MWD
7541.29 54.60 55.90 91.30 5321.12 3941.72 2070.23 3355.61 3942.83 58.33 1.81 MWD
7638.65 54.21 55.70 97.30 5377.76 4020.65 2114.70 3421.04 4021.88 58.28 0.43 MWD
7730.32 54.00 55.30 91,70 5431.52 4094.74 2156.78 3482.26 4096.08 58.23 0,42 MWD
7825.52 54.16 56.20 95.20 5487.37 4171.65 2200.17 3545.99 4173.10 58.18 0.78 MWD
7917.52 54.10 55.10 92.00 5541.28 4246.02 2242.23 3607.54 4247.58 58.14 0,97 MWD
8011.95 54.52 54.50 94.40 5596.35 4322.41 2286.43 3670.19 4324.12 58.08 0.68 MWD
8106.65 54.10 54.50 94.70 5651.60 4399.01 2331.09 3732.81 4400.89 58.02 0.44 MWD
Page 3
Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Survey
depth angle angle length depth section +N/S- +E/ - displ Azim (deg/ Type
(ft) (deg) (deg) (ft) (ft) (ft) (fi:) (fi:) (fi:) (deg) 100f)
8200.96 53.18 55.7 94.4 5707.57 4474.78 2374.59 3795.15 4476.81 57.97 1.41 MWD
8294.47 53.65 55.3 93.5 5763.29 4549.66 2417.11 3857.02 4551.82 57.93 0.61 MWD
8389.80 55.15 55.9 95.3 5818.77 4626.95 2460.89 3920.96 4629.24 57.89 1.66 MWD
8484.00 54.96 56.7 94.2 5872.73 4704.03 2503.73 3985.20 4706.43 57.86 0.72 MWD
8577.90 56.58 57.5 93.9 5925.55 4781.58 2545.89 4050.38 4784.05 57.85 1.86 MWD
8671.27 58.84 57.6 93.4 5975.44 4860.47 2588.25 4117.01 4863 57.84 2.42 MWD
8765.08 59.61 56.8 93.8 6023.43 4940.99 2631.91 4184.75 4943.59 57.83 1.1 MWD
8857.62 60.01 57.1 92.5 6069.95 5020.85 2675.52 4251.76 5023.53 57.82 0.52 MWD
8949.89 59,86 57.5 92.3 6116.19 5100.66 2718.67 4318.98 5103.41 57.81 0.41 MWD
9043.56 59.98 56.1 93.7 6163.15 5181.63 2763.07 4386.83 5184.48 57.8 1.3 MWD
9136.82 60.64 57.6 93.2 6209.32 5262.50 2807.34 4454.61 5265.43 57.78 1.57 MWD
9230.89 61.27 56.4 94.1 6255.00 5344.67 2852.14 4523.60 5347.68 57.77 1.3 MWD
9327.26 62.26 55.7 96.4 6300.61 5429.43 2899.57 4594.05 5432.57 57.74 1.21 MWD
9422.19 61.70 54.3 94.9 6345.19 5512.92 2947.62 4662.68 5516.25 57.7 1.43 MWD
9517.46 60.04 54.9 95.3 6391.58 5595.83 2995.84 4730.53 5599.37 57.65 1.83 MWD
9609.50 60.42 54.8 92.0 6437.26 5675.40 3041.82 4795.82 5679.14 57.61 0.42 MWD
9703.55 61.45 54.6 94.1 6482.98 5757.34 3089,35 4862.95 5761.28 57.57 1.11 MWD
9796.43 61.84 54.3 92.8 6527.05 5838.67 3136.83 4929.39 5842.83 57.53 0.51 MWD
9891.51 62.31 55.0 95.1 6571.59 5922.37 3185.45 4997.93 5926.75 57.49 0.82 MWD
9985.71 61.19 54.2 94.2 6616.17 6005.02 3233.51 5065,57 6009.62 57.45 1.4 MWD
10078.27 58.19 55.5 92.6 6662.90 6084.66 3279,54 5130.91 6089.47 57.41 3.46 MWD
10173.43 59.37 55.5 95.1 6712.20 6165.77 3325.60 5197.94 6170.75 57.39 1.24 MWD
10265.89 60.71 55.5 92.5 6758.39 6245.69 3370.99 5263.98 6250.85 57.36 1.45 MWD
10358.57 60.49 55.2 92.7 6803.90 6326.22 3416.91 5330.42 6331.56 57.34 0.37 MWD
10451.57 57.53 56.0 93.0 6851.77 6405.73 3461.95 5396.19 6411.24 57.32 3.27 MWD
10548.40 58.81 56.6 96.8 6902.83 6487.83 3507.58 5464.61 6493.47 57.3 1.42 MWD
10639.35 59.01 55.7 90.9 6949.77 6565.52 3550.94 5529.26 6571.29 57.29 0.88 MWD
10734.23 56.15 57.3 94.9 7000.64 6645.50 3595.17 5596.04 6651.38 57.28 3.33 MWD
10825.79 55.87 56.9 91.6 7051.85 6721.36 3636.42 5659.81 6727.33 57.28 0.47 MWD
10917.03 53.13 56.6 91.2 7104.81 6795.51 3677.12 5721.89 6801.56 57.27 3.02 MWD
11011.86 53.61 58.2 94.9 7161.43 6871.60 3718.15 5786.05 6877.72 57.27 1.44 MWD
11105.65 54.53 56.9 93.7 7216.41 6947.42 3758.86 5850.07 6953.59 57.28 1.49 MWD
11200.24 55.30 56.4 94.6 7270.79 7024.72 3801.42 5914.73 7030.99 57.27 0.92 MWD
11295.82 54.51 55.0 95.6 7325,75 7102.74 3845.49 5979.35 7109.18 57.25 1.46 MWD
11391.35 51.83 56.0 95.6 7383.06 7179.05 3888.84 6042.40 7185.65 57.24 2.93 MWD
11483.69 52.21 55.3 92.3 7439.86 7251.62 3929.89 6102.46 7258.38 57.22 0.73 MWD
11578.36 52.86 54.1 94.7 7497.46 7326.50 3973.32 6163.80 7333.47 57.19 1.22 MWD
11672.57 53.64 54.1 94.2 7553.82 7401.62 4017.58 6224.94 7408.84 57.16 0.83 MWD
Page 4
Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Survey
depth angle angle length depth section +N/S- +E/W- displ Azim (deg! Type
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f')
11768.13 54.43 55.3 95.5 7609.91 7478.62 4062.24 6288.03 7486.06 57.14 1.31 MWD
11861.76 55.36 54.4 93.7 7663.79 7555.00 4106.38 6350.70 7562.65 57.11 1.27 MWD
11954.07 54.93 53.6 92.3 7716.54 7630.36 4150.89 6411.98 7638.28 57.08 0.85 MWD
12049.98 54.73 52.6 95.9 7771.78 7708.24 4197.96 6474.67 7716.49 57.04 0.88 MWD
12143.13 55.67 53.4 93.1 7824.92 7784.16 4243.97 6535.72 7792.75 57 1.23 MWD
12239.67 55.92 52.7 96.6 7879.22 7863.52 4291.99 6599.57 7872.45 56.96 0.65 MWD
12330.26 54.58 52.5 90.6 7930.86 7937.39 4337.20 6658.70 7946.67 56.92 1.49 MWD
12424.80 55.48 51.1 94.5 7985.03 8014.09 4385.09 6719.55 8023.8 56.87 1.54 MWD
12517.09 56.51 50.7 92.3 8036.65 8089.70 4433.35 6778.93 8099.9 56.82 1.17 MWD
12615.06 57.56 51.0 98.0 8089.97 8170.95 4485.26 6842.69 8181.69 56.76 1.1 MWD
12707.18 58.04 52.0 92.1 8139.05 8248.08 4533.77 6903.68 8259.29 56.71 1.06 MWD
12799.30 58.09 52.0 92.1 8187.77 8325.54 4581.89 6965.27 8337.19 56.66 0.05 MWD
12894.03 55.40 52.4 94.7 8239.69 8404.05 4630.43 7027.84 8416.14 56.62 2.86 MWD
12989.14 56.32 52.1 95.1 8293.06 8482.10 4678.62 7090.07 8494.62 56.58 1 MWD
13080.43 57.08 52.4 91.3 8343.19 8557.76 4725.33 7150.41 8570.72 56.54 0.88 MWD
13176.28 56.44 51.0 95.9 8395.76 8637.19 4775.04 7213.36 8650.64 56.5 1.39 MWD
13268.26 53.69 52.1 92.0 8448.44 8711.84 4821.94 7272.41 8725.77 56.45 3.15 MWD
13360.98 54.50 51.9 92.7 8502.80 8786.25 4868.17 7331.58 8800.63 56.42 0.89 MWD
13454.70 55.35 52.0 93.7 8556.64 8862.24 4915.44 7391.96 8877.08 56.38 0.91 MWD
13549.13 55.81 51.5 94.4 8610.00 8939.36 4963.65 7453.12 8954.7 56.34 0.65 MWD
13643.08 55.99 51.4 94.0 8662.70 9016.39 5012.15 7513.99 9032.26 56.3 0.21 MWD
13737.05 56.34 50.8 94.0 8715.04 9093.60 5061.19 7574.75 9110.02 56:25 0.65 MWD
13768.57 56.38 50.8 31.5 8732.49 9119.50 5077.76 7595.08 9136.13 56.23 0.13 MWD
13799.38 57.05 51.0 30.8 8749.40 9144.95 5094.00 7615.06 9161.77 56.22 2.24 MWD
13809.00 57.05 51.0 9.6 8754.62 9152.91 5099.07 7621.32 9169.79 56.22 0 MWD
13828.18 61,74 51.9 19.2 8764.39 9169.26 5109.36 7634.24 9186.25 56.21 24.8 MWD
13852.99 71.08 52.9 24.8 8774.30 9191.78 5123.21 7652.23 9208.9 56.2 37.8 MWD
13886.75 82.05 54.4 33.7 8782.12 9224.33 5142.60 7678.60 9241.6 56.19 32.8 MWD
13920.43 86.15 54.9 33.7 8785.59 9257.71 5161.99 7705.93 9275.1 56.18 12.3 MWD
13947.43 87.29 56.8 27.0 8787.13 9284.61 5177.12 7728.24 9302.05 56.18 8.2 MWD
13982.64 88.42 61.6 35.2 8788.45 9319.77 5195.12 7758.44 9337.17 56.19 14 MWD
14014.04 88.42 65.7 31.4 8789.32 9351.08 5209.05 7786.56 9368.29 56.22 13.1 MWD
14046.74 87.15 69.5 32.7 8790.58 9383.44 5221.50 7816.77 9400.32 56.26 12.2 MWD
14077.25 86.98 73.3 30.6 8792.15 9413.35 5231.25 7845.73 9429.81 56.31 12.4 MWD
14143.04 87.25 73.9 65.7 8795.46 9477.05 5249.77 7908.67 9492.48 56.42 1 MWD
14237.13 87.19 75.3 94.1 8800.02 9567.87 5274.73 7999.29 9581.82 56.6 1.49 MWD
14303.29 85.54 80.7 66.2 8804.22 9630.57 5288.46 8063.88 9643.34 56.74 8.51 MWD
14332.39 86.61 80.1 29.1 8806.21 9657.72 5293.31 8092.51 9669.94 56.81 4.21 MWD
Page 5
Measured Incl Azimuth Course TVD Vertical Displ Displ Total At ' DLS Survey
depth angle angle length depth section +N/S- +E/W- displ Azim (degl Type
(ft) (deg) (deg) (ft) (it) (ft) (ft) (It) (ft) (deg) 100f)
14361.71 90.00 81.1 29.3 8807.08 9685.08 5298.09 8121.40 9696.74 56.88 12,1 MWD
14394.76 93.98 79.8 33.1 8805.93 9716.00 5303.57 8154.01 9727.06 56.96 12,7 MWD
14431.07 94.05 78.8 36.3 8803.39 9750.11 5310.30 8189.59 9760.57 57.04 2.75 MWD
14468.62 93.64 78.7 37.5 8800.87 9785.48 5317.60 8226.29 9795.34 57.12 1,13 MWD
14499.07 93.33 78.4 30.5 8799.02 9814.29 5323.64 8256.13 9823.68 57.19 1.41 MWD
14530.61 93.47 78.2 31.5 8797.15 9844.09 5330.02 8286.92 9853.02 57.25 0.77 MWD
14566.81 93.15 77.1 36.2 8795.06 9878.47 5337.75 8322.22 9886.9 57.32 3.16 MWD
14597.15 90.17 79.1 30.3 8794.18 9907.20 5343.99 8351.85 9915.22 57.39 11.8 MWD
14624.38 89.76 79.0 27.3 8794.20 9932.96 5349.18 8378.65 9940.6 57.44 1.55 MWD
14659.36 88.97 78.5 35.0 8794.59 9966.04 5356.00 8412.98 9973.21 57.52 2.67 MWD
14691.97 89.07 77.9 32.6 8795.14 9996.95 5362.67 8444.89 10003.7 57.58 1.87 MWD
14722.33 88.39 78,1 30.3 8795.82 10025.70 5368.97 8474.52 10032.1 57.64 2.34 MWD
14757.92 84.27 78.2 35.6 8798.09 10059.40 5376.26 8509.28 10065.4 57.71 11.6 MWD
14790.48 84.13 78.4 32.6 8801.39 10090.13 5382.84 8541.04 10095.8 57.78 0.75 MWD
14815.94 84.33 78.1 25.4 8803.94 10114.09 5387.99 8565.78 10119.4 57.83 1.41 MWD
14857.72 87.33 78.9 41.8 8806.98 10153.55 5396.30 8606.63 10158.5 57.91 7.43 MWD
14888.47 87.53 78.2 30.8 8808.36 10182.67 5402.40 8636.78 10187.3 57.97 2.36 MWD
14914.51 88.25 79.3 26.0 8809.32 10207.22 5407.47 8662.27 10211.5 58.03 5.05 MWD
14948.36 88.04 77,3 33.9 8810.42 10239.33 5414.34 8695.44 10243.3 58.09 5.93 MWD
14980.71 89.11 77.9 32.3 8811.22 10270.06 5421.28 8726.98 10273.8 58.15 3.8 MWD
15008.60 89.07 77.6 27.9 8811.66 10296.58 5427.20 8754.24 10300.1 58.2 1.08 MWD
15107.88 89.04 79.6 99.3 8813.30 10390.50 5446.82 8851.56 10393.2 58.39 2.01 MWD
15200.90 86.74 79.7 93.0 8816.72 10477.85 5463.52 8942.98 10479.8 58.58 2.48 MWD
15289.28 87.26 82.4 88.4 8821.35 10560.06 5477.25 9030.18 10561.5 58.76 3.11 MWD
15385.92 86.33 81.3 96.6 8826.75 10649.39 5490.92 9125.65 10650.2 58,96 1.49 MWD
15479.33 86.05 81.1 93.4 8832.96 10736.09 5505.18 9217.75 10736.6 59.15 0.37 MWD
15538.43 85.74 82.6 59.1 8837.19 10790.68 5513.53 9276.10 10791 59.27 2.59 MWD
15583.14 85.98 83.0 44.7 8840.42 10831.69 5519.12 9320.33 10831.9 59.37 1.04 MWD
15623.65 84.44 82.6 40.6 8843.81 10868.90 5524.19 9360.47 10869 59.45 3.92 MWD
15677.86 83.16 80,1 54.2 8849.66 10918.97 5532.29 9413.73 10919 59.56 5.16 MWD
15777.70 81.43 80.0 99.8 8863.04 11011.69 5549.38 9511.14 11011.7 59.74 1.74 MWD
15872.56 81.15 79.7 94.9 8877.41 11099.75 5565.91 9603.47 11099.8 59.9 0.43 MWD
15965.94 75.48 79.9 93.3 8896.30 11185.51 5582.09 9693.36 11185.8 60.06 6.08 MWD
16043.96 74.80 80.7 78.1 8916.33 11256.17 5594.81 9767.77 11256.6 60.2 1.32 MWD
Projected to TD
16100.00 74.80 80.7 56.0 8931.01 11306.62 5603.54 9821.10 11307.2 60.29 0 Projected
Page 6
[Fwd: West Beach 05B, Permit 98-191]
Subject: [Fwd: West Beach 05B, Permit 98-191]
Date: Thu, 03 Dec 1998 15:54:18-0900
From: Jack Hartz <jack_hartz~admin. state.ak.us>
Organization: Alaska Oil & Gas Conservation Commission
To: David Johnston <dave_johnston~admin.state.ak.us>
David,
FYI, this is a reply I made to a notification of some work Arco is
doing at WB-05B. Most of the reporting can and will be handled via the
10-407 and 10-405. Using the WB-04 to kick off the WB-05B well after
stimulation is the only wrinkle. If you want me to prepare a letter
acknowledging their plan and the use of WB-04 for incidental gas for
kick off, I can do so.
Let me know what you think.
Thanks
Jack
Subject: Re: West Beach 05B, Permit 98-191
Date: Wed, 02 Dec 1998 15:15:26 -0900
From: Jack Hartz <jack_hartz~admin. state.ak.us>
Organization: Alaska Oil & Gas Conservation Commission
To: Mike R Morgan <MMORGAN~mail.aai.arco.com>
CC: Lori Taylor <lofi_taylor~admin.state.ak.us>
Mike,
I recieved your note. The plan appears appropriate for the testing of WB-05B.
The use of WB-04 for lifting WB-05B to kick it off is reasonable for test
purposes as was done in the past with No. Prudhoe ~3.
Keep us posted as to your progress toward a development plan.
Thanks,
Jack Hartz
Mike R Morgan wrote:
Jack,
Below is a summary of our discussions yesterday afternoon regarding the
initial completion and testing of the West Beach-O5B (WB-O5B) well.
Presently, we are in the process of running the completion tubing, and we
should be releasing Pool 7 from the well on Wednesday, December 2, 1998,
in preparation to drill the West Beach-06 well.
(1) A summary of the initial completion and testing results will be
submitted along with the WB-O5B Well Completion Report, Form 10-407. The
planned scope of work includes: cased hole CNL logging, coil tubing
conveyed perforating and fracturing of the Kuparuk reservoir interval.
(2) If the WB-O5B well gas oil ratio exceeds twice the "original solution
gas oil ratio" of the pool (approximately 560 SCF/STB) we will need to
submit a request for a waiver of 20 AAC 25.240. As you are aware,
production data from this well and WB-06 are key to finalizing the West
Beach Development Plan.
I of 2 12/9/98 2:38 PM
)-Fwd: West Beach 05B, Permit 98-191]
One item I failed to bring up in our discussions was the temporary use of
WB-04 for raw lift gas, similar to our use for ongoing North Prudhoe Bay 3
remedial work (Permit 92-145). Presently we don't have lift gas to the pad,
and we'll need WB-04 well gas to kick off the WB-O5B well following the
fracture treatment.
If you have any questions regarding our plans or progress on the work
please call me at 263-4332. I'll keep you apprised on our progress.
Regards,
Mike Morgan
Jack Hartz <jack hartz~admin.state.ak.us>
Petroleum Reservoir Engineer
Alaska Oil and Gas Conservation Commission
Jack Hartz <jack hartz~admin.state.ak.us>
Petroleum Reservoir Engineer
Alaska Oil and Gas Conservation Commission
2 of 2 12/9/98 2:38 PM
'Rei [Fv[d: West Beach 05B, Permit 98-191]
Subject: Re: [Fwd: West Beach 05B, Permit 98-191]
Date: Wed, 09 Dec 1998 14:01:44-0900
Fro m: "David W. Johnston" <Dave_Johnston~admin. state, ak.us>
Organization: DOA-AOGCC
To: j ack_hartz~admin, state.ak.us
Jack, I don't think a letter is necessary unless they want something for
their files. I recommend printing off your stuff and placing it in well
file.
Dave.
Jack Hartz wrote:
> David,
> FYI, this is a reply I made to a notification of some work Arco is
> doing at WB-O5B. Most of the reporting can and will be handled via the
> 10-407 and 10-405. Using the WB-04 to kick off the WB-O5B well after
> stimulation is the only wrinkle. If you want me to prepare a letter
> acknowledging their plan and the use of WB-04 for incidental gas for
> kick off, I can do so.
>
> Let me know what you think.
>
> Thanks
>
> Jack
Part 1.2
Type: message~rfc822
Encoding: 7bi t
jack_hartz.vcf
Name: jack_hartz, vcf
Type: VCard (text/x-vcard)
Encoding: 7bi t
Description: Card for Jack Hartz
1 of 1 12/9/98 2:37 PM
are. d
.rv!ces
nll n.cl
Alaska
Mr Blair Wondzell
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
(907) 279-1433
(907) 276-7542 (fax)
November 18, 1998
R,e: Open Hole Sidetrack in 6" Production Interval on West Beach Well WB-05B (Pool Rig #7)
Dear Mr. Wondzell,
As per our telephone conversation this afternoon, this letter is to document the issues discussed
regarding the current operations on West Beach Well WB-05B.
As explained, operations on Well WB-05B are proceeding as per the general procedure submitted
with the 'Permit to Drill' (Permit # 98-191). However, while drilling the 6" horizontal production
interval the wellbore path exited the target interval, the Kuparuk sands, and drilled up into the HRZ
shale overlying the Kupauk formation. The decision was made to do an open hole sidetrack
approximately 250' from the current TD of the horizontal interval, placing the well path back into the
sand and avoiding any hole problems associated with the troublesome HRZ interval. The 250' of
open hole beyond the sidetrack point will be left 'as is' and abandoned, while a 4-1/2" production
liner will be run and cemented in the remaining 6" horizontal section. See attached diagram for
details.
If~you have any questions or require any additional information on this matter, please contact me at
564-5521.
Sincerely, ~) ~ h('~O lO0
William S. Isaacson
Drilling Engineer
Share Services Drilling
91 O0 93OO 9500
875O ' '
8760
8770
8780
~ 8790
.E 8800
8810
882O
8830
8840
8850
Section Departure
9700 9900 10100
10300
1 O5OO
I.
10700
Well Path from Surveys
Base Projection at 1.58 degrees
~Top Kup/KaJub 1.7 deg
'--"--"Sidetrack Plan . ...
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: David JohnSt~ DATE:
Chairman/~
THRU: Blair Wondzell "~ FILE NO:
P. I. Supervisor ~ ~ ~,'
FROM: John H Spaulding, SUBJECT:
Petroleum Inspector
October 10, 1998
az11jjfe.doc
Confidential' Yes _: NoX,
Attachment Only .
BOPE Test Pool 7
ARCO / West Beach State
Prudhoe Oil Pool
PTD 98-191
October 10, 1998: I traveled to ARCO's West Beach State location to witness
the BOPE test on Pool rig 7. The AOGCC BOPE Test Report is attached for
reference.
As noted on the attached BOPE test report the test the test lasted 4.5 hours with
no observed failures. The test of the upper kelly valves and the lower set of
variable bore rams (4.5" x 7") was not observed due to mechanical problems
with the top drive. These items were later tested by toolpusher David Lancaster.
The rig was in good condition and the area around the rig was quite clean with
good access. All excess items were stored properly.
SUMMARY: I witnessed the initial BOPE test on Pool rig 7, ARCO well WB-
05B.
Pool 7, 10/10/98, test time 4.5 hours, no failures
Attachment: azlljjfe.xis
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION' Drlg: ~' Workover: __
Drlg Contractor: Pool Rig No.
Operator: ARCO
Well Name: WB-O5B
Casing Size: 9 5/8" Set @ 6,630
Test: Initial X Weekly Other
7 PTD #
Rep.:
Rig Rep.:
Location: Sec.
DATE: 10/10/98
98-191 Rig Ph.# 659-4815
Mike Whitety
Dave Lancaster
25 T. 12N R. 14E Meddian UM
Test
MISC. INSPECTIONS:
Location Gen.: ok
Housekeeping: ok
PTD On Location ok
Standing- Order Posted
(Gen)
ok
Well Sign ok
Drl. Rig ok
Hazard Sec. ok
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Bali Type
Inside BOP
Quan. Pressure P/F
25O/5,00O
250/5,000
f 250/5,000 Fl
f 250/5,000 P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press.
f 250/25OO
I 250/5,000
250/5,000
1 250/5,000
f 250/5,000
2 250/5,000
I 250/5,000
na 250/5,000
P/F
P
MUD SYSTEM: Visual Alarm
Tdp Tank ok ok
Pit Level Indicators ok ok
Flow Indicator ok ok
Meth Gas Detector ok ok
H2S Gas Detector ok ok
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
Test
Pressure P/F
17 250/5,000 P
34 250/5,000 P
1 P
Func~oned
Func~oned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 1
System Pressure Attained 3
Blind Switch Covers: Master:
Nitgn. Btl's:
3,000 P
1,600 P
minutes 8
minutes 26
yes Remote:
6 ~ 1950 avg.
Psig.
sec.
sec.
yes
Number of Failures: 0 ,TestTime: 4.5 Hours. Number of v a lv es tested 21 Repair or Replacement of Failed
Equipment will be made within 0 days. ~lotify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433
REMARKS:
Did not witness the upper Kelly valves as top drive haad problems (later tested by rig rep ok)
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
FI-O21L (Rev.12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
John H. Spauiding
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A'Ii'N: Sherrie
NO. 12752
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field:
West Beach
(Cased Hole)
Well Job # Log Description Date BL Sepia CD
WB-05B 99292 MEMORY GPJCCL ~'(~1./~(.~ 990705 I I 1
.,
,,
8/12/99
SIGNE~~
DATE:
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
4/8/99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATi'N: Sherrie
NO. 12489
Companl Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Floppy LIS
Well Job # Log Description Date BL Sepia Disk Tape
WB-05B PB2 99144 IMPULSE MD 981116 I 1
WB-05B PB2 991~ IMPULSE ~ 981116 1 1
~-05B PB2 991~ ~A~ ~ ~OG 981116
SIGNE bATE:
Please sign and return one copy of this transmi.al to Shelri. at the above oddr. s, or fax to (907)
4/14~99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
NO. 12502
Company: Alaska Oil & Gas Cons Corem (~ Attn: Loft Taylor
B 3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Floppy
Well Job # Log Description Date BL Sepia Disk
CD-R
WB- 05B ,~ql ~' 991~2 CDR/IMPULSE 981126 1
W~-05B 99142 CDR/IMPULSE 981126 1 1
WB-05B 99142 CDR/IMPULSE TVD 981126 1 1
WB-05B RFT 981108 1 I
ED
DATE: ,Aiasl~;a O, jl & """ '""" "' .....' .... "'"
/ ehorage
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-6521. Thank yo,
3/30/99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
NO. 12478
Companl Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Floppy LIS
Well Job ,9 Log Description Date BL Sepia Disk Tape
WB-05B PB1 99143 CDR/ADN IMPULSE--'" --'''~[z.~C)C~_~ 981108 1
WB-05B PB1 99143 CDR/IMPULSE 981108 1 1
WB-05B PB1 9~].~3 CDR/IMPULSE TVD 981108 1 1
WB-05B PB1 99zg3 VISION MD 981108 1 1
WB-05B PB1 99z~3 VISIONED 981108 1 1
DATE:
,,~laska Oil & Gas Coris. l~;oIltl'iil~i~'~[ ~
~,ncl~0rage
Pleose sign dnd return one copy of this tronsmiffol to Sherrie ot the obove oddress or fox to (gO7) 5~2-~521. Thonk ~
3/26/99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
NO. 12463
Compan~ Alaska Oil & Gas Cons Corem
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Floppy LIS
Well Job # Log Description Date BL Sepia Disk Tape
SIGNE DATE: ?,r~t~R 2 6 ]999
Alaska Oil & Gas Cons, C0mmi~i0n
Please sign and return one copy of this transmiffal to Sherrie at the above address or fax to (907) 562-65~r1~1~ you
SAMPLE TRANSMITTAL
TO:
AOGCC
3001 PORCUPINE
ANCHORAGE, AK.
OPERATOR: AAI
SAMPLE TYPE: M
DATE: DECEMBER 1, 1998
AIR BILL: DROP-OFF
AF~T:: 08-12-01-01
CHARGE CODE: N/A
NAME: WEST BEACH 5B
APl NO:
NUMBER OF BOXES: 12
SAMPLES SENT:
WEST BEACH 5B
6660'-'i-49-7-~ [ ~.t ~ ~ ~
WEST BEACH 5B ST1
13810'-'14970'
14730'-16100'
--
RECEIVED:
CC: SCHAFER, DANIEL
WESTERGAARD, ED
TONY' KNOWLE$, (~OVEBNOI~
ALASI~& OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
October 2, 1998
Lowell Crane
Drilling Engineering Supervisor
ARCO Alaska. Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re;
West Beach WB-05B
ARCO Alaska, Inc.
Permit No: 98-191
Sur Loc: 104~NSL, 3219%VEL, Sec. 25, T12N, R14E, UM
Btmhole Loc. 4~NSL, 147~EL, Sec. 19, T12N, R15E, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
David W. John~~_
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA ~..~-iL AND GAS CONSERVATION corvf~-VilSSlON
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. KBE = 52.2' West Beach/Kuparuk
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL034627
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
104' NSL, 3219' WEL, SEC. 25, T12N, R14E, UM West Beach State
At top of productive interval 8. Well Number Number U-630610
5107' NSL, 405' WEL, SEC. 30, T12N, R15E, UM WB-05B
At total depth 9. Apprqximate spud date Amount $200,000.00
4' NSL, 147' WEL, SEC. 19, T12N, R15E, UM C~ ]10)/02/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL034628, 4'I WB-03, 70' at surface 2560 16183' MD / 8934' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 6640' MD Maximum Hole Angle 9o° Maximum surface 2655 psig, At total depth O-VD) 8950' / 3550 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 13754' Surface Surface 13804' 8803' 235 sx Class 'G'
6" 3-1/2" 9.3# 13CR NSCT 2583' 13600' 8820' 16183' 8934' 390 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 18033 feet Plugs (measured) Cememt Plugs; 15600' -16648', 12372' -11750'
true vertical 9309 feet Bridqe Pluq; 8876' -9007', saeezed 15 bbls below BP
Effective depth: measured 17000 feet Junk (measured)
true vertical 8950 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 20" 260 sx Arcticset (Approx.) 121' 121'
Surface 6590' 9-5/8" 2970 sx PF 'E', 860 sx Class 'G' 6630' 4830'
Intermediate 9155' 7" 125 sx Class 'G' 9155' 5770'
Production
Liner 3136' 4-1/2" N/A R E C E IV E D 9040'-12176' 5730'-6895'
Perforation depth: measured N/A S~'D 1`7 !1.9~j 0 R I G!ILtA L
true vertical A~aSkP., 0il & Gas Cons. C0rnmissi0~
Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Carol Withey, 564-4114
21. I hereby certify t//hl yforegoing isT~_/~.correct to the best of mY knowledge
Signed Lowell Cra/ne.7~/~"~---~¢ T:,,,'~ Drilling Engineering Supervisor Date ~ -
Commission Use Only
Permit Number I APl Number Approval Date__ I See cover letter
,~"//,~//I 50- O.~.2. ~ - .~, ~-- ~' / ~ - ~ ~ / ~ '",¢,~ '" ~-'~I for other requirements
Conditions of Approval: Samples Required []Yes .~No Mud Log Required []Yes .~No
Hydrogen Sulfide Measures []Yes ~No Directional Survey Required ~'Yes [] No
Required Working Pressure for BOPE []2M; []3M; [~5M; []10M; [--115M
Other:
Approved By Orifj',Fle! '.--:,igned By by order of
.... :~ ,~, lnhn~tnn Commissioner the commission Date/'~)
Form 10-401 Rev. 12-01-85
Submit In Triplicate
WB-O~B Well Plan Summary
Surface Location: 104' FSL 3219' FEL Sec 25 T12N R14E
Target Location: 5107' FSL 405' FEL Sec 30 T12N R15E
Bottom Hole Location: 4' FSL 147' FEL Sec 19 T12N R15E
I AFENumber: I 2D0063 I I Rig: I
I Estimated Start Date: I 10-2-98 I l Operating days:'
Pool #7
I 28
IMD: I 16,183' ] ]TVD: I 8,934' I IKBE: I 52.2'
Type of Well (producer or injector):
Well Design (conventional, slimhole, etc.):
Producer
Ul~ra-Slimhole with Liner
Formation Markers: (all depths RKB)
Measured True Vertical Formation Mud
Formation Tops Depth, ft Depth, ft Gradient, ppg WeighO, ppg
Base Permafrost 1850 1850 8.552 8.8
T5 (SV3) 4285 3940 8.55 9.2
T3 (SV1) 5724 4515 8.55 9.2
Ugnu (K- 15) 6873 4940 8.8 9.4
West Sak 10,088 6732 8.8 9.4
Colville 10,429 6922 8.8 9.4
Shale Wall 13,506 8637 8.8 10.6
Cabana 12,995 8350 9.7 10.6
to 13,525 to 8650
HRZ 13,748 8772 9.4 10.63
Kuparuk 13,804 8803 8.0 10.3
TD (Kingak) 16,183 8934 8.2 10.3
1 Unless otherwise noted, the mud weights are based on a minimum: 125 psi overbalance, if the depth <5000' ss;
and 150 psi overbalance, if the depth >5000' ss.
2 Seawater gradient assumed through the SV sands.
3 10.6 ppg is a result coming from Wellbore Stability Study. Value may change depending on ECD Considerations
from Hydraulics and PWD. Desired Static Bottomhole EMW is 10.8 ppg
Version 1 9-17~98--WSI
Casing/Tubing Program: (all depths feet RKB)
Existing from Initial Operation on WB-05 & 05A
Hole Size Csg]Tbg -Wt/Ft Grade Conn. Length Top Btm
OD MDfFVD MD/TVD
Driven 20" 94# H-40 WLD 80 GL 120 / 120
12 lA" 9 5/8" 40# L-80 BTC 6578 GL 6630 / 4832
Planned for WB-05B Operations
Hole Size Csg]Tbg ~/t/Ft Grade Conn. Length Top Btm
OD MD/TVD MDfrVD
8 ¥2" 7" 26# L-80 BTC-M 13754 GL 13804 / 8803
6" 3 ~2" 9.3# 13-Cr NSCT 2583 13600 / 8820 16183 / 8934
Tubing 3 ¥2" 9.3# L-80 8rd-Mod 13550 GL 13600 / 8820
Mud Program:
Intermediate Hole up to mud swap out (6630'-13,000'): Low Solids Non-Dispersed
Interval Density Viscosity YP LSR YP pH Fluid
(ppg) (seconds) Loss
Initial 8.6-8.8 38-40 8-14 4-7 8.5-9.5 12-8
U~nu 9.0-9.2 40-45 18-25 7-10 8.5-9.5 8-6
West Sak 9.2-9.4 40-45 18-25 7-10 8.5-9.5 8-6
Colville 9.4-9.6 40-45 18-22 5-8 8.5-9.5 +4
Intermediate Hole after mud swap out (13,000'-13,804'): 3 % KCI / Polymer / 5 % GEM
Shale Wall 10.6 40-50 17-22 5-8 8.5-9.5 +_4
HRZ 10.6 40-50 17-22 5-8 8.5-9.5 +_4
Production Hole (Pilot Hole and Horizontal Interval): 3 % KCI / Polymer / 5 % GEM
Kuparuk 10.3 40-50 17-22 5-8 8.5-9.5 +_4
Kingak 10.3 40-50 17-22 5-8 8.5-9.5 +_4
Loggin~_JFormation Evaluation Program:
Intermediate MWD/GR; CDR/PWD; DWOB/DTOQ (entire hole section)
Wireline: None
Production (Pilot Hole) MWD/GR; CDR/ADN
Wireline' Schlumber er RFT
Production (Horizontal) MWD/GR/CDR
Wireline / DP: None
Cased Hole Logs: Schlumberger GR (Post Rig)
Version 1 9-17-98--WSI
Directional
KOP: 6640' Begin 6°/100 ft drop and mm from 70° inclination
and 60° azimuth, to 56° and 55.4°.
Max Hole -90° In Horizontal Interval - 14,000'-16,183' (TD)
Angle:
Close Approach Minimum Normal Distance~Survey-to-Survey
Wells: WB-03 70' @ Surface
Survey Surface- KOP MWD surveys while drilling 12 ¼" surface hole.
Program: KOP - TD MWD surveys
Cementing Program
Hole Category Casing Volume~ Type of Cement Properties2
Size/Depth
Intermediate 7" @ 13,804' 235 sx3 Class "G" w/ Den 15.8 ppg
48 bbls 0.2% Halad 344 Yield 1.15 ft 3/sx
0.2 % CFR-3 Water 5.0 gps
(as required) % HR-5 TI' Batch mix + 4 hrs
Temp BHST 180° / CT 150°
Production 3 ½" @ 16,183' 390 sx4 Class "G" w/ Den 15.8 ppg
Liner 83 bbls 0.25% CBL Yield 1.2 ft 3/sx
0.5% Halad 344 Water 3.5 gps
0.22 % CFR-3 TI' Batch mix + 4.5 hrs
(as required) % HR-5 Temp BHST 180° / CT 150°
Rounded up to the nearest 5 sacks.
Thickening time requirements are based upon time needed to batch mix + pumping time + 2 hrs (at BHCT).
To 1300' MD in 8-1/2" x 7" + 50% excess + 80 ft shoe joint
To 2780' MD in 6" x 3-1/2" +30% excess + 90 ft shoe joint + 200' Liner lap + 200' excess above liner top.
Version 1 9-17-98--WSI
Drilling HazardsfRisks
Reservoir Pressure
In November 1997, RFT's were run as part of drilling operations on WB-05 and pressures were
obtained from both the Kupamk and Cabana Sands. The Kuparuk reservoir was under-pressured
in the area, with the equivalent mud weight measuring between 7.5 to 8.0 ppg (3550 psi @ 8950'
TVD). The Cabana Sands were measured with an equivalent mud weight measuring
approximately 9.7 ppg (4270 psi @ 8480' TVD).
Lost Circulation/Faults
The suspect lost circulation zones in the area are the SV, Ugnu, and West Sak sands. The SV
intervals will be isolated behind the 9-5/8" casing and should not be of any concern. However,
the Ugnu and West Sak sands will be open while drilling the 8 V2" interval to the top Kuparuk.
Monitor fluid levels closely to understand losses to these formations and use best practices to
avoid differential sticking. Also, the potential for fluid losses in the Kuparuk interval is high due
to the low reservoir pressure in this area.
Close Approaches
Close approach issues are of minimal concern due to the limited number of wells in the area and
the depth at which drilling operations begin in this sidetrack. The current directional plan passes
all appropriate anti-collision rules.
Formations
Expect to have full sections of the Shale Wall and HRZ. Both formations have shown hole
instability potential in the past. Closely monitor mud weight and ECD's at all times.
Controlling and understanding these is the key to preventing a destabilized wellbore. Also, since
we will be drilling these formations in the intermediate hole section, the increase in mud weight
introduces the potential for differential sticking in the West Sak and Ugnu :sands.
Well Control
Well control equipment consisting of 5000 psi WP pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Disposal
Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all
Class I wastes to Pad 3 for disposal. All cuttings from drilling operations will be hauled to CC-
2A for disposal, except any metal cuttings which will be sent to the North Slope Borough.
Version 1 9-17-98mWSI
Drill and Complete Summary
1. Move in / rig up Pool Rig #7. NU and test BOPE. Notify AOGCC 24 hours in advance.
2. Cut and pull 7" casing at +/-6780' (~150' below 9-5/8" surface casing shoe).
3. Spot balanced cement kick-off plug from top of casing stub and up into 9-5/8" casing shoe.
4. Kick-off and directionally drill 8 V2" intermediate hole to the section TD at 13,804' MD (Top
Kupamk).
5. Run and cement 7" intermediate casing.
6. Pressure test casing to 3500 psi.
7. Drill 6" pilot hole to ~14,180' MD and evaluate Kupamk reservoir. Run MWD/GR/CDR/
ADN in pilot hole.
8. RU E-line and run open hole RFT log.
9. Plug back pilot hole with cement kick-off plug from TD to 7" casing shoe.
10. Sidetrack well, building to horizontal and drilling 6" production interval to ~ 16,180' MD as
per directional plan.
11. Run and cement 3 V2" chrome production liner. Set liner hanger and liner top packer.
12. Pressure test casing and liner lap to 3500 psi.
! 3. Run 3 V2" single completion and sting into polished bore receptacle at top of liner. Space out.
Displace well to sea water and freeze protect. Test tubing and annulus.
14. ND BOPE. NU and test tree.
15. Secure well; RDMO Pool Rig #7.
Post Rig Work
1. Clean out liner to PBTD with coiled tubing.
2. Perforate as per asset requirements using coiled tubing.
Version 1 9-17-98--WSI
Anadrill Schlumberger
Alaska District
3940 Arctic ~lvd.
Anchorage, AK 99503
(907) 273-1700 Fax SB1-8537
DIREC~IOAULL ~ELL Pklk~T for S}tARED SERVICES DRILLING
Well ......... : ~E-05BPRi (P2A)
Pield ........ : Prudboe Bay, West Seach
Com~utation..: Minimum Ch~rvature
Units ........ : FE~'T
$~rface hat..: 70.35835052 N
S~rface Long.: 148.47332922 ~
Legal Description
Surface ...... : 104 FSL 3219 FEL S25 T12N RI4E IIM
Tie-in survey: 1711 FSL 522 FEL $25 T12N R14EI/M
Target ....... : 5107 FS5 405 FEL S30 T12N RRnE L~M
RFI~ .......... : 4 FSL %47 F~L S19 T52~ R15E IYM
LOCATIONS - ALASKA Zone: 4
X-Coord Y-Coord
687975.92 5983003.20
690631.56 5984677.07
695500.00 5988200.00
6D5752.40 598538~.44
STATION MEA~ETRED
IDENTIFICATION DEPTH
TIE-IN SURVEY 6589.07
6600~00
TOP OF WI~q]0W 6635.00
KOP CURVE 6/~00 ~640~00
6700.00
INCL4~ DIRECTXON VERTEC~L-DEPTHS
~J~GL~ AZI~KJTH T%rD StTB-SEA
70.28 60.75 4818.10 476~.90
70-22 60.5] 4821.79 4769.59
70-01 59.81 1833.70 4781.50
69.98 59.9I 483~.%l 4783.21
~6.50 58.73 4857,65 ~80S.~5
SECTIO~
DEPART
3139.22
3149.51
3182.42
]187.12
]242.83
Prepared ..... ; 15 Sep ~998
Vert sect az.: 59.69
K~ elevation.: ~2.20 ft
b~ag~etic Dcln: +28.D40 {~)
Scale Factor.:
Con~z-ge~ce..: +1.43806584
ANADEILL AKA-DPC
APPROVED
FOP, PERM IT't'I NG
ONLY
COOPd] I NATqnS - F~OM ALASKA Zone
~ELI~{EAD K
~606.79 14 2696.97
[611.83 14 2705.93
~628.20 1~ 2334.49
1659.08 N 2986.4l
FAC~
690631.56 5984697,07 t07L <TIE
6906~0.3~ S95~682.34 107L 2.01
69066g.52 5984699.42 107L 2.01
690672.52 5984701.89 I~6L 2.01
6907~9.66 S984731.58 165L ~.00
6300.00 60.11 56.97 4902.%0 48~9.90
K-IS 6873.15 56.49 5S.56 4940,20 4888.00
END 6/100 CURVE 6879.43 56o13 55.43 4943.68 4891.48
~TEST SA/{ 10088.33 56.13 55.~3 6732.20 668D.00
K-12 ~0~29,22 56.13 55.43 6922.20 6870.00
CABANA 12994,89 56,13
55.43
83S2.20 8300.00
3394.62
3399.83
6056,92
6338,97
8463.28
1706-69
t741.34
1744.30
3256.07
3416.67
4625
2862.24 E 690794.25 5984781.08 164L 6.00
2914.15 ~ 690~45.28 5984g%?.82 164L 6.00
291~.46 ~ 690849.51 5984520.09 ES 6-00
5112.~7 E 693004.57 5986396.~5 ~S 0.00
5345.35 E 693233.5~ 5986552.74 BS O.OO
7099.38 E 694956,5~ 5987805.04 HS 0.00
C
(Azxadrill {c]98 WBnSPB12 3,2C 3:53 PM P) b
WB- 05BPB] (P2A)
PROPOSED ~qELL PRO.~ILE
STAT ION M~ASURTD I NCLN
IDENT I F lC_AT ION DE PT[{ ~24GLE
K-tO 13506 .:23 56.13
TOP HP~q <<<<<<<<<<cc ]3748.44 56-13
7" CSG PT ¢11> 1380~.06 56.13
~P~ 1380~- 06 56,13
TA~ET *****~***~*~ 13804.06 56.13
DIRECTION VER~ICAL-OE?THS
AZIMUTH T"JD SUB-SEA
====~==== ========
55.43 8637,20 8585.00
55.43 8772,20 8720.00
55.4t 8803.20 8751.00
55.43 8803-20 8751.00
55.43 $$03.20 8751.00
TOP KINC_~AK 13979. B9 56 . L3
TD L4179~ 89 56.13
TOP IVISHAK
55.43 8901.20 8849.00
55.43 9012.67 8960.47
/0202.20 lOLS0.O0
SECTION
DEPART
8886-65
9087.20
9133.25
9133,25
9133.25
9278.83
9444.43
L5 Sep 1998 Page 2
COORDINATES - FROM
WP. LLREAD
-====== ........
ALASKA Zone 4 TOOL
X Y FAC~
4966.30 N 7448.96 E
4980,42 N 7614.56 E
5006,62 N 7652.58 E
5006.62 ~ 7652.55 E
5006.6~ N 7652.58 E
5089.46 M ?772.79 E
5L83-68 N 7909.52 E
695299.98 5988054.63 KS 0.00
695462.65 5988172.B5 KS O.O0
695500.O0 5988200.00 KS 0.00
695500.00 5985200.00 HS O.OO
695500.00 5988200.00 FIS O.O0
6956L8.08 ~9BB285.82
695752.40 5988383.44
0.00
0.00
(Aaadrill (c) gg WBSSPB12 3.2C 3;53 PM P}
.APP
t=OR PERMITTING
ONLY'
PLAN
.~....,
SHAREI 'SECiV :[ CES "'BR I E'L T NG
iiiii ii lm ·
. i _. i iiii ii ._ i i iii
~000
40~
70(
i2000
~nadr] ]/ Schlumberger
iii .I _ _. III
I I I ii _. i i II
WB-05BPB& (P2A)
VERTICAL SECTION VIEW
Il I II I
Section at: 59.69
i ANAD :JILL /~KA-DPC
-- - ~ .~ D awn ..... : ~5 Sap 1998
' ONL ....
~ ~ ! A) lIE-IN ~RVEY 6589 4818 3139 70.~
~ > B) 70P OF Wt~OOK 6635 4834 3182 70.[
LA cf- I~ El~ ' C] KOP CURVE 6/tO0 6640 4835 3~87 69.{
I
~.=., ~L] .......... ~..~ ................ i D) E~ 6/I00 CUR~E 6679 4944 3400 56. J
............... "='" E} 7' CSG PT q l > ~3804 6803 9~33 56. J
F) TA~EI ~~x~ 13804 8603 9133 56.:
~ .~ ~ .......... 6) TD ~4~80 9013 9444 56.'.
-~l ~ ........... ~ ,
f
I
I
" ' ...... i_ '' I '"
13
13
$3
~3
0 ~000 ~000 ~000 ~000 nooo nooo 7000 sooo ~000 toooo ~1000 1~00 ~3000 14<~00 1500(> ~Gooo ~7000
....... .S,_e, ct i?n OP.P..a.r.t?.re ..........................
'SHARED SERVICES
Narker I~entification ND BKB S£CTN IN[i. LN
Al 7" r. SO PT <11> i3~4 8803 9i35 56. t3
B) 7ARGEf ~~t~,~ ~380~ 8803 9~33 56. i3
C) TO ~4t~ 90t3 9444 56.t3
i ii ii i
~nadri]] Schlumberger
~B-05BPBI (P2A)
VERTICAL SECTION VIE~
J ! TVD Scale.: I ~nch = 200 feet
~]~ ' IOep Scale.: , inch =200 feet
8~oo- .. Drawn .....: ~5 Sep 1998
i iii i i
'x,,,,, ..
A.~.A~)R iLL /..,. ~.:;,a,.~ L~, i
.... . .... }. m., ~.,,, .
, ~ i.'"' ~.x..~
......... , ,.
"
.
1
I '' '
qT~
gBo,
8000 BIO0 e200 8300 8400 8500 8600 6700 8~0 8900 ~00
Section Departure
~aadr~]~" (cl~ ~]2 3,~ 3:~ ~ P
Section at: 5g.69
Anadr i ] ] S£hl umberger
WB-OSBPBI (P2A)
PLAN VZEW
i ii i i ii iii
CLOSURE ..... : 9457 ir. et at Azimuth 56,76
DECLINATION.: +28.040 (E)
SCALE ....... : I inch = 2000 feet
DRAHN ....... : 15 Sep ~998
SERV
Marker Identit~cation ~ N/S E/~
M TIE-IN SURVEY 6589 1807 N 2697 E
B fOP gF ~tNDO~ 6635 1628 N 2734 E
C) KOP CURVE 6/100 6640 163) N 2739 E
D) END 6/I00 CURVE 6879 ~744 N 2918 E
E) 7" CSG Pl <ii > 1~04 5007 N 7653 E
F) IARGEI ~~*~ t3804 5007 N 7653 E
G) ID ~4180 5]84 N 79~0 E
..'¥ \!. N.I LL %.?:./J,.-L~,": ''~ '::"-' ....
: -. ,. ~,
-:.
rO~ 'D ~'" Ri'vt iT':r {'''' '''
, ,.. ,, . '~'R; t,'..;.
~.W.~ .~b~''
4'.,.'..
..................
................................ . .............................
?
i looo o ~OgO 2000 300D
<- WEST: EAST ->
(~nadP)l~ Jc)gB HBSBPeL~ 3.2C l: 5:7 P,N PI
I r "' ~
· ~ :
/ -
.,,
,,
.
·
~ .j . I, ~ ·
_ .
...... . ,, -
,.. "
,,
) ..... ........ . ~ ¢^~,,-, ~ .nnn onnn ~nnnn t loo0 12000 13000 t4.0DO ~5000 56000 1700
4000 5000 6000
AnadrilL schlumberger
Alaska D/strict
3940 Arctic Rlvd.
Anchora§e, AK 99503
(907) 273-1700 Fax 561-8537
DfRECTIONAL ~gELL Pk~ for SHARED SERVICD~ DRILLING
Well ......... : WB-05B {P2A)
Field ........ : Prudhoe Bay. West Beach
Computation,.: Min£~um Curvature
Units ........ : FEET
Surface Lat..: 7~.35%35652 N
Surface Long.: 148.473[2922 ~
Lesal Description
Surface ...... : [~4 FSL 3219 FEL S25 T12~ RT4E IR4
Tie-i~ survey: 5107 F$L 4~5 ~EL S30 T12N RT5E IR4
Tar~et ....... : 619 FSL 3{60 PEL S28 T12N R15E U~
~HL .......... : 619 FSL ~460 PEL S20 T12N R15S U~
IX>CATIONS - ALASKA Zone: 4
X-Coord Y-Coord
6~79~5.9l $983003,20
695500,00 5988200.00
6~770Q.00 5989050.00
697700-00 598905D.00
I~ROI~OSED WELL PROFfLE
Prepared ..... : 15 Sep 1998
Vert sect az.: 59.69
KB elevation.: 52-20 ft
Masnetic ~cln: +28-0{0 (E}
Scale Factor.: 0.9999~014
Convergence..: ~1.43806584
STATION M~ASUREO ~NCLK DIRECTION VERTICAL-DE~T~B SECTI0N
I DENT ~ FICAT IO~ DBPTK AN~LE AZIMUTH TVD SU~-SEA DEPART
ODORDI~gATES -
~ELLHEA~
"' /'.,NAD.Y,'~LL .<':<,<-. ~-.
- :_.~. -..
.'~
· ~ ~..-.~, ~ &:;;.~'~.'
~,'% !..~ %
- : ,,'..', L/' ~
: .. ...............
.................. : ...................
==~
ALASKA. Z,o~e 4
Y
TOOL DL/
FACE 100
K-10 8637.20 8585.00
TO~ }{RZ <<<<4<<<<<<< 8772.~0 87X0.00
7" CSG PT <]1> 13804.06 56.13 55.43 8803.20 8751.00 9t33-25 5006.62 ~ 76S2.58 E 695500.00 598820~.00 ~S
KIIPARUK ~3804.06 56.13 - 55,43 SS03.20 S751.00 9133-25 5006.62 N 765~.58 E 695500.00 59S8200.00 HS
TARGET (PILOT) 13804.~6 56.13 55.43 S803,20 8g51.0Q 9133.25 5006.62 N 7652.56 E 695500,00 5988200.0~ ES
KOP CURVE
13835.00 56,13 55.{3 8820.44 8768,24 9158.67 5021.20 N 7673.~4 E 695520.78 5988215.10 28R
13850.00 58.53 56.89 8825.54 8776.34 9i71.47 50~8.22 N 7684.22 E 695531.09 5988222.39 27~ ~8,00
13900.00 66.64 61.29 8851.55 8799.35 9~15-80 5050.94 ~ 7722.29 E 695568.57 5985~46.D6 25R 18,00
13950.00 74.86 65.18 8868.03 88L5.83 9262.86 5072.1~ N 7764.41 E 695618.1~ 5988268.30 25R 18.00
14000.80 83.1~ 68.77 6S77.56 S~5.36 9311.49 5091,30 N 7809,54 E 69565~.78 598828S.59 23~ 18.00
END 18/L00 CURVE 14fl32.$7 88.55 71.04 8879,92 8827.72 9343,45 5102.46 N 784~.04 ~ 695684.98 598830Q,5~ ES 1B.O0
(An.adritl (c)98 WB5BP2 3.2C 3:58 PM p} ~ C
W~- 05B (P~-A) ~5 Sep 1998 Page 2
PROPOSED ~gEL~, PROFILE
STATION MEA@URED I NCLN DIRECT ION
ID~gTI FIC-~T ION DEPTH ANGLE AZ I MUTt{
TO[~ KING~%K (PILOT) 14875.7~ 88.55
T~D 4-1/2" Lb~R PT<I [> 16185,27 88.55
TOP KII~C~AK (TD) %6183.29 88.55
TOP %VISHAK
SECTIO~ COORB INATE9 - FRD~{ kLASK~ Zone
DE PART ~LbH~D X
91.04 8901.20 6849.00
71.04 6934.20 8882.00
71.0~ 8934.20 8882,00
10202.20 1OlSO.OO
10169.88
1145t.46
11451,46
53~6.38 N
5801-18 H
FACE lOO
=
8637.18 E 696474.95 5988594.3( 8S 0.00
9873.35
~873.35 E 697700.00 5989D50.00 O-OO
(Anadri]l (c)9§ W~SE~2 5,2C 5:S8 PM ~)
7500
T
V
84(
855,
87
SH -RE.D.s.E,.,R I OES .DRIL,.L Z,.NG ', ..... ,' I
ii i ii ii i i ii i ii iii i i ii i1 iL_ ii ii .
i i i i i ii . i im ii. i
,4nadr'jlJ Sch]umbe£g~r
i i i · iii
i ii i ii ii ii
" - / Dep Scale.: ! inch = 300 feet
-- , '~ - 1Drawn ..... : ~_5 Sep ~.998
1 "
~. ~ m i iiii i i i i
...... -- . Ncrk~n Iden[i~icatioe HO BKB SEETN Z~CL
.~. A) 7' USG PI <11> ~3804 6~3 9i33 56.
-~. B} TARBET (PILOT) 13804 8603 9~33 56.
._ '~. 6) KOP CURVE t8/~00 1~35 8820 9159 56.
~ .... '~D) ENO tB/~O0 C~RVE ~4033 8880 9343 BB.
~'~.~-1/2' LNRPT<~I> 16i83 6934 ~1451
..............
.... ~ ' , . . . ~ .....
~ .L,~'. 'A ~.:'""~: ' .'~ ' ~.;~"'f. '
.?,
"~ ,-....,.,,. ~,'-':~ :.7' ' .... '
. .'.. , :~ ; ~ ~ ,
,K:~ - ~ ~ ..............
I
........
---~~ .............. ~ r¢'~
.....
. .
.... '.,, .......J ~ ........ E ....
i
I ~ ..........
NB-05B (P2A)
VERTICAL SECTION VIEW
Section at' 59.69
3
9000 9150 9300 9450 9600 9750 9900 t0050 10200 t0350 10500 t0650 10800 t0950 l 1'100 -] t250 11400 ~J1550 ~1700
............... SeCtion Depgr, tur,,e, ....................
Anadri]l Schlumberger
PLAN VIEW
_ ii
]LOSUAE ' 11451 feet at Azimuth 59.56
ii
, .... ,,, ' SHARED' sER'VIcE"~ DRILLING" ' 1
i iiii · ii iii iii i _ ii iiii i · . _ ! __
i ii i i iii iii i flu i i iiii ._ ii i ..... .
~CALE ' 1 inch : 300 fBBt
)F~ANN ' t~ Sep ~ggEt ~ ......
~ark~-r Identification MD N/S
~] 7~ C~
5) TARGET (PILOT) 13BO~ 5007 N 7653 E
~) XOP CURVE tS/~OD ~3B35 5021
)) ENO
~) lg 4-,/2" LNR PT<J J>
........... ~ ,.
5O
O0
7500 7650 7800 7950 It-l. O0 8250 BZlO0 6550 ~]700 BBSO 9000 9150 9300 9zl50 9600 9750 §goo 10050 10200
EASI ->
[~adril] I~$~B I~I~I~IBP2 :),~:'~113 m P) ........................................ - .....
~50
STATE OF ALASKA
AND GAS CONSERVATION.--~.-.)f
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator ARCO Alaska Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
104' NSL, 3219' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
17' NSL, 1986' WEL, SEC. 20, T12N, R15E, UM
At effective depth
17' NSL, 1896' WEL, SEC. 20, T12N, R15E, UM
At total depth
25' NSL, 926' WEL, SEC. 20, T12N, R15E, UM
5. Type of well:
[] Development
[--I Exploratory
F-] Stratigraphic
[--J Service
12. Pre~ent well condition summary
Total depth: measured 18033 feet
true vertical 9309 feet
Effective depth: measured 17000 feet
true vertical 8950 feet
Plugs (measured)
Junk (measured)
6. Datum Elevation (DF or KB)
KBE = 41'
7. Unit or Property Name
West Beach State
8. Well Number
WB-05A
9. Permit Number
97-225
10. APl Number
50-029-22817-01
11. Field and Pool
West Beach/Kuparuk
Casing
Length Size
Structural
Conductor 80' 20"
Surface 6590' 9-5/8"
I nterm ed iate 9155' 7"
Production
Liner 3136' 4-1/2"
Cemented MD 'I-VD
260 sx Arcticset (Approx.) 121' 121'
2970 sx PF 'E', 860 sx Class 'G' 6630' 4830'
125 sx Class 'G' 9155' 5770'
N/A 9040'-12176' 5730'-6895'
Perforation depth: measured N/A
true vertical
Tubing (size, grade, and measured depth) N/A
Packers and SSSV (type and measured depth) N/A
ORIGINAL
13. Attachments ~ Description summary of proposal I--1 Detailed operations program l--] BOP sketch
4. Estimated date for commencing operation
January 9, 1998
16. If proposal was verbally approved
Blair Wondzell
Name of approver
Contact Engineer Name/Number: Torn Maunder, 564-5521
1/9/98
Date approved
I15. Status of well classifications as:
[] Oil ~ Gas [] Suspended
Service
Prepared By Name/Number: Kathy Carnpoamor, 564-5122
17. I hereby certify that the~ isr~tr/ue a~d correct to the best of my knowledge
Signed SteveShu~t~ _~ ('tX)O~' Title Senior Drilling Engineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Date
I
Approved C.opy Plug integrity ~
Returned Mechanical Integrity Test
TAPprokved b) order of the Commission
BOP Test x;,'" Location clearance __
Subsequent form required 10- z(O'7
0avid W. johnston
Commissioner
Form 10-403 Rev. 06/15/88
07/13/9 0014031
VENDOR Al .ASKAST 14
INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
~gB CKO7099B~ 100. O0 100. O0
qDLIN~ INST' s/h carol withe§ x 4114
· WELL PERMIT CHECKLIST
FIELD & POOL ~ ~'/'~/<:~'("~
COMPANY ~.-~ WELL NAME/X:~/ /4J,~--'O ~"z~' PROGRAM: exp [] dev serv El wellbore seg II ann. disposal para req II
INITCLASS /~¥./ /-c.),',) GEOLAREA ??~, UNIT# //_.~ ,5'~,'~--~ .. ON/OFFSHORE 0,,'~ ......
ADMINISTRATION 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
IAx,~ D/~TE''' 12'
, ,,?/~//~'~--~ 13.
Permit fee attached .......................
Lease number appropriate ...................
Unique well name and number ..................
Well located in a defined pool ..................
Well located proper distance from drilling unit boundary ....
Well located proper distance from other wells ..........
Sufficient acreage available in drilling unit ............
If deviated, is wellbore plat included ...............
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can be issued without administrative approval ......
Can permit be approved before 15-day wait ...........
ENGINEERING
GEOLOGY
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CM'r vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons .......... {~ N
19. Casing designs adequate for C, T, B & permafrost ....... (~ N
20. Adequate tankage or reserve pit ................. ,~, N
21. If a re-drill, has a ~0-403 for abandonment been approved... ~ N
22. Adequate wellbore separation proposed ............. N
23. If diveder required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequale ..... (~) N
25. BOPEs, do they meet regulation ................ ~,~ N
26. BOPE press rating appropriate; test to _ ~'-~ C~ psig. 00 N
27. Choke manifold complies w/APl RP-53'-[May 84) ........ /~ N
28. Work will occur without operation shutdown ........... ~ N
29. Is presence of H2S gas probable ................. Y
30. Permit can be issued w/o hydrogen sulfide measures ..... Y
31. Data presented on potential overpressure zones ....... ,Y.~,,
32. Seismic analysis of shallow gas zones ..... ' ........
33. Seabed condition survey (if off-shore) ............. J Y N
34. Co0tact,nam. elphon,e.for weekly progress reports ....... / Y N .
lexp~ora~ory omyJ .
__PR DA
ANNULAR DISPOSAL 35.
APPR DATE
With proper cementing records, this plan
(A) will contain,waste in a suitable receiving zone; ....... Y N
(B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) wiiTn~'o't~i~ir.'81e,,chanical integrity of the well used for disposal; Y N
(D) will nOl damage producing formation or impair recovery from a Y N__
pool; and
(E) will not circ,.u.. ,m.v,e~n.t._.2,0 AAC 25.252 or 20 AAC 25.412. Y. N
GEOLOGY: UIC/Annula'r ' ' coMMiSSiON:
M:cheklisl rev 05129198
dlf'C, ~,r~l<;olfi(',¢~w[~f('linrl~,(fl;tft;l\, I,!~ I,
ENGINEERING:
JDH ~
v
DWJ ~ .~
RNC
N
N
'~ N
'~ N
'~ N
'~ N
~ N
'~ N
'~ N
q U
Comments/InStructions:
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
. ,
....... SCHLUMBERGER .......
* ............................ *
COMPANY NAME : ARCO ALASKA, INC.
WELL NAME : WB- 05B PB1
FIELD NAME : WEST BEACH
BOROUGH : NORTH SLOPE
STATE : ALASKA
API ~ER : 500292281770
REFERENCE NO : 99143
RECEIVED
,APR 2 7 1999
~a Oil & G~s'Oons. Commission
LIS T!~W~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR-l,__~j~ 16:21
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/26
ORIGIN : FLIC
REEL NAME : 99143
CONTINUATION # :
PREVIOUS REEL :
COMJ4ENT : ARCO ALASKA, WB-OSB PB1, WEST BEACH, API #50-029-22817-70
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/26
ORIGIN : FLIC
TAPE NAME : 99143
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, WB-O5B PB1, WEST BEACH, API #50-029-22817-70
TAPE HEADER
WEST BEACH
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
BIT RUN 1
99143
ROSE
P~
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL :
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
WB-OSB PB1
500292281770
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
26-MAR-99
BIT RUN 2 BIT RUN 3
25
12N
14E
52. O0
52. O0
11.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
20.000 80.0
12.275 9.625 6640.0
LIS T~p~' Verification Listing
Schlumberger Alaska Computing Center
26-MAR-l>_~ 16:21
3RD STRING 8. 750
PRODUCTION STRING
7.000 13807.0
REMARKS:
THIS TAPE CONTAINS THE LDWG FORMATTED LWD CDR, IMPULSE,
AND ADN DATA AQUIRED ON ARCO ALASKA'S WB-O5PB1 WELL.
$
$
PAGE:
FILE HEADER
FILE NAME : EDIT .001
SERVICE · FLIC
VERSION : O01CO1
DATE · 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE StCZk4ARY
LDWG TOOL CODE
..............
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
14011.5 6644.5
BASELINE DEPTH
88888.0
13795.0
13780.0
13770.5
13767.5
13759.5
13751.5
13747.5
13743.5
13725.0
13711.0
13686.0
13684.5
13679.0
13641.5
13627.0
13623.5
13621.5
13616.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
.......
88889 5
13796 5
13782 5
13772 0
13767 5
13760 5
13752 5
13749 0
13745 0
13727 0
13710.5
13686.0
13684.5
13679.0
13643.0
13629.0
13625.5
13623.0
13616.0
LIS Ta~~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR-i>~=~16:21
PAGE:
13613.0
13605.0
13602.0
13598 5
13593 0
13589 0
13569 0
13565 5
13559 0
13541 0
13533 5
13529 5
13524 0
13515 5
13506.0
13491.0
13488.5
13484.5
13481.5
13477.5
13475.0
13471.0
13468.5
13462.0
13458.0
13449.0
13443.5
13430.5
13424.5
13416.0
13411.5
13410.0
13406.5
13400.0
13399 0
13393 5
13392 0
13389 5
13382 0
13370 5
13367 5
13363 5
13356 5
13342 5
100 0
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
13614.0
13602.5
13600.5
13596.5
13591.5
13588.5
13568.5
13564.0
13555.5
13538.0
13530.5
13528.5
13522.5
13513.0
13503.5
13490.0
13485.5
13483.5
13481.5
13476.0
13474.0
13467.5
13465.5
13460.0
13455.5
13448.0
13441.0
13426.0
13421.5
13413.5
13410.5
13407.5
13405.5
13397.0
13395.0
13389.0
13385.5
13384.0
13377.5
13369.0
13364.0
13359.5
13352.0
13337.0
94.5
BIT RUN NO. MERGE TOP MERGE BASE
1 6650.0 13330.0
1 13330.0 13772.0
2 13776.0 13930.0
2 13930.0 14008.0
LIS T~pe Verification Listing
Schlumberger Alaska Computing Center
2 6 - ~ - i'~-~ .16:21
PAGE:
REMARKS:
THIS FILE CONTAINS THE EDITED DATA. THE LWD CURVES ARE
CORRELATED OVER THE INTERVAL 13321' TO 13799' (KOP) TO
THE W-OSB MCNL LOG RUN BY SCHLUMBERGER ON 21-FEB-99
USING THE SHIFTS SHOWN ABOVE. THE LAST SHIFTS ARE
CARRIED OVER THE REMAINING INTERVAL. THE CURVES ARE
~iERGED AT THE DEPTHS SHOWN ABOVE. THERE ARE MERGES
IN THE MIDDLE OF BIT RUNS BECAUSE FIELD SOFTWARE
PROBLEMS CREATED 2 SEPERATE FILES FOR EACH BIT RUN. THE
CURVES ARE CLIPPED AT FIRST AND LAST VALID READINGS.
THE CDR CURVES ARE QRO PROCESSED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 116
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 8
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI O0 000 O0 0 1 1 1 4 68 0000000000
RPD MWD OH~iM O0 000 O0 0 1 1 1 4 68 0000000000
RPM MWD OttNk~ O0 000 O0 0 1 1 1 4 68 0000000000
RPS ~4~D OHN~I O0 000 O0 0 1 1 1 4 68 0000000000
RPX MWD OH~M O0 000 O0 0 1 1 1 4 68 0000000000
·
LIS T~ap~· Verification Listing
Schlumberger Alaska Computing Center
26-MAR-l:_.=~ 16:21
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 1 1 1 4 68 0000000000
RPXXMWD OHFk4
RAD MWD OH~M O0 000 O0 0 1 1 1 4 68 0000000000
RAM MWD OH~ O0 000 O0 0 1 1 1 4 68 0000000000
RAS MWD OH~ O0 000 O0 0 1 1 1 4 68 0000000000
RAX MWD OH~I O0 000 O0 0 1 1 1 4 68 0000000000
RA MWD OHA~4 O0 000 O0 0 1 1 1 4 68 0000000000
RP MWD OH~4M O0 000 O0 0 1 1 1 4 68 0000000000
VRA MWD Ot{M~{ O0 000 O0 0 1 1 1 4 68 0000000000
VRP MWD OH~M O0 000 O0 0 1 1 1 4 68 0000000000
DCAL MlffD IN O0 000 O0 0 1 1 1 4 68 0000000000
TRPMMWD RPM O0 000 O0 0 1 1 1 4 68 0000000000
RHOBMWD G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
RHO1 MWD G/C3 O0 000 O0 0 1 1 1 4 68 O0000000aD
RH02 MWD G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
RH03 MWD G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
RH04 MWD O/C3 O0 000 O0 0 1 1 1 4 68 0000000000
DRHOMWD G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
NPHIMWD PU-S O0 000 O0 0 1 1 1 4 68 0000000000
TNRAMWD O0 000 O0 0 1 1 1 4 68 0000000000
PEF MWD BN/E O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNT GAPI O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 16010.000
RPD.MWD -999.250
RPXX.MWD -999.250
RAX.MWD -999.250
VRP.MWD -999.250
RHO1.MWD -999.250
DRHO.MWD -999.250
GRCH. CNT 50.613
DEPT. 6644.500
RPD.MWD -999.250
RPXX.MWD -999.250
RAX.MWD -999.250
VRP.MWD -999.250
RHO1.MWD -999.250
DRHO.MWD -999.250
GRCH. CNT -999.250
FET. MWD -999.250 ROP.MWD -999.250 GR.MWD
RPM.MWD -999.250 RPS.MWD -999.250 RPX.MWD
RAD.MWD -999.250 RmIM.MWD -999.250 RAS.MWD
RA.MWD -999.250 RP.MWD -999.250 VRA.MWD
DCAL.MWD -999.250 TRPM.MWD -999.250 RHOB.MWD
RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD
NPHI.MWD -999.250 TNRA.MWD -999.250 PEF.MWD
FET.MWD -999.250 ROP.MWD -999.250 GR.MWD
RPM.MWD -999.250 RPS.MWD -999.250 RPX.MWD
RAD.MWD -999.250 RAM. MWD -999.250 RAS.MWD
RA.MWD 4.290 RP.MWD 4.250 VRA.MWD
DCAL.MWD -999.250 TRPM.MWD -999.250 RHOB.MWD
RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD
NPHI.MWD -999.250 TNRA.MWD -999.250 PEF.MWD
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
69.470
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
LIS ~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR-l¥_~ 16:21
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE :. FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE ArUMBER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SU~94ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
13852.5 6644.0
LOG HEADER DATA
DATE LOGGED: 08-NOV-98
SOFTWARE:
SURFACE SOFTWARE VERSION: ID5 IA 12
DOWNHOLE SOFTWARE VERSION: 5.0
DATA TYPE (MEMORY or REAL-TIME): IzZEMORY
TD DRILLER (FT) : 14060.0
TOP LOG INTERVAL (FT) : 6500.0
BOTTOM LOG INTERVAL (FT) : 14060.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 51.8
MAXIMUM ANGLE: 63.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GA~94A RAY
CDR RESISTIVITY
ADN AZIM DENSITY NUETRON
TOOL NUMBER
MWD-10A
CDR-675
ADN-475
LIS '~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR-i~ 16:21
PAGE:
IMP
$
RESISTIVITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
IMPULSE-475
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 9.20
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (0P2~4) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): 2.200
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN1 *************
********* 8.75 in hole **********
Drilled interval: 6640 ft to 13852 ft
Realtime Resistivity - GR data presented
Tool Numbers: CDR751/~iDC210
Software: CDR VSO, MiO VSO
IDEAL VSO ob 68
GR is corrected for bit size and mud weight
************ 6.0 in hole **********
Drilled interval: 13852 ft to 14060 ft
Data from recorded memory
Tool Numbers: IMPO12 &ADN023
Software: ADN VS.1, IMP VS.0
IDEAL VSO la 12
GR is corrected for bit size aund mud weight
Washdown data: 13802 ft to 13970 ft
Drilling data: 13970 ft to 14060 ft
THIS FILE CONTAINS THE RAW DATA FOR THE UPPER
PORTION OF BIT RUN #1.
$
LIS FORMAT DATA
LIS ~p~ Verification Listing
Schlumberger Alaska Computing Center
PAGE .. 8
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
GR LW1 GAPI O0 000 O0 0 2 1 1 4 68 0000000000
ROP5 LW1 F/HR O0 000 O0 0 2 1 1 4 68 0000000000
TABR LW1 S O0 000 O0 0 2 1 1 4 68 0000000000
ATR LW1 OttMM O0 000 O0 0 2 1 1 4 68 0000000000
PSR LW1 OH~ff4 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT.
ATR.LW1
6644. 000 GR.LWl 51. 360 ROP5.LW1
O . 160 PSR. LW1 2000. 000
DEPT. 13852. 500 GR. LW1 -999. 250 ROPS. LW1
ATR. LW1 - 999.250 PSR. LWl - 999.250
5.250 TABR.LW1 24980.000
157.940 TABR.LW1 -999.250
** END OF DATA **
LIS '~p~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR-~-~9 16:21
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: O. 5000
FILE SUM~Uh~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
13852.0 13176.0
LOG HEADER DATA
DATE LOGGED: 08-NOV-98
SOFTWARE:
SURFACE SOFTWARE VERSION: ID5 IA 12
DOWNHOLE SOFTWARE VERSION: 5.0
DATA TYPE (MEMORY or REAL-TIM~) : MEMORY
TD DRILLER (FT) : 14060.0
TOP LOG INTERVAL (FT): 6500.0
BOTTOM LOG INTERVAL (FT) : 14060.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 51.8
MAXIMUM ANGLE: 63.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUPIBER
GR GAi~IA RAY MWD-iOA
CDR RESISTIVITY CDR-675
ADN AZIM DENSITY NUETRON ADN-475
LIS ~pe' Verification Listing
Schlumberger Alaska Computing Center
26-MAR-~9 16:21
PAGE ..
10
IMP
$
RESISTIVITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
IMPULSE-475
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE: GEM
MUD DENSITY (LB/G): 10.40
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHYk4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): 0.330
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) '.
20000
REY~LRKS: ************ RUN1 *************
********* 8.75 in hole **********
Drilled interval: 6640 ft to 13852 ft
Realtime Resistivity - GR data presented
Tool Numbers: CDR751/NDC210
Software: CDR V50, MiO VSO
IDEAL VSO ob 68
GR is corrected for bit size and mud weight
************ 6.0 in hole **********
Drilled interval: 13852 ft to 14060 ft
Data from recorded memory
Tool Numbers: IMPO12 &ADN023
Software: ADN VS.1, IMP VS.0
IDEAL VSO la 12
GR is corrected for bit size and mud weight
Washdown data: 13802 ft to 13970 ft
Drilling data: 13970 ft to 14060 ft
THIS FILE CONTAINS THERAW DATA FOR THE LOWER
PORTION OF BIT RUN #1.
$
LIS FORMAT DATA
LIS ~e Verification Listing
Schlumberger Alaska Computing Center
26-MAR-~J9 16:21
PAGE: 11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000
ROP5 LWR F/HR O0 000 O0 0 3 1 1 4 68 0000000000
GR LWR GAPI O0 000 O0 0 3 1 1 4 68 0000000000
ATR LWR OH~4 O0 000 O0 0 3 1 1 4 68 0000000000
PSR LWR 0H~94 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 13176.000 ROPS.LWR
PSR.LWR 4.140
DEPT. 13852.000 ROPS.LWR
PSR.LWR -999.250
11. 100 GR.LWR 51. 770 ATR.LWR 4.170
157. 250 GR. LWR -999. 250 ATR. LWR -999. 250
** END OF DATA **
26-MAR-i~9 16:21 PAGE: 12
LIS ~pe Verification Listing
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE AUJ?4BER 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0. 5000
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
13748.5 13980.5
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
08-NOV-98
ID5 lA 12
5.0
MEMORY
14060.0
6500.0
14060.0
51.8
63.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NTJM~ER
GR G~ RAY MWD- 10A
CDR RESISTIVITY CDR- 675
ADN AZIM DENSITY NUETRON ADN-475
LIS ~p-e Verification Listing
Schlumberger Alaska Computing Center
26-MAR-~ 16:21
PAGE: 13
IMP
$
RESISTIVITY
IMPULSE-475
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE: KCL
MUD DENSITY (LB/G): 10.50
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~fl~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): O. 303
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): 0.248
MUD CAKE AT (MT): O. 357
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) :
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN1 *************
********* 8.75 in hole **********
Drilled interval: 6640 ft to 13852 ft
Realtime Resistivity - OR data presented
Tool Numbers: CDR751/~!DC210
Software: CDR V50, MiO V50
IDEAL VSO ob 68
GR is corrected for bit size and mud weight
************ 6.0 in hole **********
Drilled interval: 13852 ft to 14060 ft
Data from recorded memory
Tool Numbers: IMPO12 &ADN023
Software: ADN V5.1, IMP VS.0
IDEAL VSO la 12
GR is corrected for bit size and mud weight
Washdown data: 13802 ft to 13970 ft
Drilling data: 13970 ft to 14060 ft
THIS FILE CONTAINS THE RAW DATA FOR THE UPPER
PORTION OF BIT RUN #2.
$
LIS FORMAT DATA
LIS ~-~. Verification Listing
Schlumberger Alaska Computing Center
26-MAR--~=--~ 16:21
PAGE:
14
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 156
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 6
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000
TVDE LW2 FT O0 000 O0 0 4 1 1 4 68 0000000000
ROP5 LW2 F/HR O0 000 O0 0 4 1 1 4 68 0000000000
TAB LW2 S O0 000 O0 0 4 1 1 4 68 0000000000
TABR LW2 S O0 000 O0 0 4 1 1 4 68 0000000000
AIOH LW2 OH~4M O0 000 O0 0 4 1 1 4 68 0000000000
A16H LW2 OH~M O0 000 O0 0 4 1 1 4 68 0000000000
A22H LW2 OH~4~ O0 000 O0 0 4 1 1 4 68 0000000000
A28H LW2 OHMM O0 000 O0 0 4 1 1 4 68 0000000000
A34H LW2 OH~M O0 000 O0 0 4 1 1 4 68 0000000000
PIOH LW2 OH~fl~ O0 000 O0 0 4 1 1 4 68 0000000000
P16H LW2 OH~4~ O0 000 O0 0 4 1 1 4 68 0000000000
P22H LW2 OH~4M O0 000 O0 0 4 1 1 4 68 0000000000
P28H LW2 OHMM O0 000 O0 0 4 1 1 4 68 0000000000
P34H LW2 OHMM O0 000 O0 0 4 1 1 4 68 0000000000
GR LW2 GAPI O0 000 O0 0 4 1 1 4 68 0000000000
TABD LW2 S O0 000 O0 0 4 1 1 4 68 0000000000
RHOB LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
DRHB LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
DRHL LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
DRHU LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
DRHR LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
PEB LW2 O0 000 O0 0 4 1 1 4 68 0000000000
PEL LW2 O0 000 O0 0 4 1 1 4 68 0000000000
PEU LW2 O0 000 O0 0 4 1 1 4 68 0000000000
PER LW2 O0 000 O0 0 4 1 1 4 68 0000000000
LIS T'~v. Verification Listing
Schlumberger Alaska Computing Center
26-MAR-l'~ 16:21
PAGE:
15
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
ROBB LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
ROBL LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
ROBU LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
ROBR LW2 G/C3 O0 000 O0 0 4 1 1 4 68 0000000000
UB LW2 O0 000 O0 0 4 1 1 4 68 0000000000
DCAL LW2 IN O0 000 O0 0 4 1 1 4 68 0000000000
TNRA LW2 O0 000 O0 0 4 1 1 4 68 0000000000
RPM LW2 RPM O0 000 O0 0 4 1 1 4 68 0000000000
DPHB LW2 PU O0 000 O0 0 4 1 1 4 68 0000000000
DPHU LW2 PU O0 000 O0 0 4 1 1 4 68 0000000000
DPHL LW2 PU O0 000 O0 0 4 1 1 4 68 0000000000
DPHR LW2 PU O0 000 O0 0 4 1 1 4 68 0000000000
TNPH LW2 PU O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 13748. 500 TVDE. LW2
TABR.LW2 -0. 016 AiOH.LW2
A28H. LW2 0. 555 A34H. LW2
P22H. LW2 O. 555 P28H. LW2
TABD . LW2 - O . 016 RHOB . LW2
DRHU. LW2 -0.550 DRHR. LW2
PEU. LW2 64. 844 PER. LW2
ROBU. LW2 2. 415 ROBR. LW2
TNRA . LW2 23.647 RPM. LW2
DPHL.LW2 15.328 DPHR.LW2
DEPT.
TABR . LW2
A28H. LW2
P22H. LW2
TABD. LW2
DRHU. LW2
PEU. LW2
ROBU. LW2
TNRA. LW2
DPHL. LW2
13980 500
2719 984
2 004
2 420
4909 984
0 023
21 100
1 956
23 627
34 178
TVDE. LW2
A1 OH. LW2
A34H. LW2
P28H. LW2
RHOB . LW2
DRHR. LW2
PER. LW2
ROBR. LW2
RPM. LW2
DPHR. LW2
8764 100
0 100
300 000
0 500
2 419
-0 624
2. 362
250. 000
17. 482
8848.900
1.998
1.985
2.478
2.094
0.034
15.650
2.088
95.500
34.050
ROPS. LW2 -999. 250 TAB. LW2
A16H. LW2 O. 100 A22H. LW2
PIOH. LW2 0.433 P16H.LW2
P34H.LW2 1. 000 GR.LW2
DRHB.LW2 -0.550 DRHL.LW2
PEB.LW2 45.147 PEL.LW2
ROBB. LW2 2.460 ROBL. LW2
UB. LW2 111. 681 DCA_L. LW2
D PHB . LW2 11 . 540 D PHU. LW2
TNPH. LW2 47.242
ROPS. LW2 66. 421 TAB. LW2
A16H. LW2 1 . 986 A22H. LW2
P1 OH. LW2 2.102 P16H. LW2
P34H. LW2 2.456 GR. LW2
DRHB . LW2 O . O16 DRHL . LW2
PEB.LW2 6. 694 PEL.LW2
ROBB. LW2 2. 323 ROBL . LW2
UB. LW2 15. 702 DCAL. LW2
DPHB.LW2 19. 845 DPHU. LW2
TNPH. LW2 47.196
0.000
0.100
0.529
145.232
-0.575
2.397
0.262
14.239
O. 864
1. 998
2. 268
100. 677
O. 068
16.328
2. 086
O. 851
42. 034
** END OF DATA **
LIS '~e Verification Listing
Schlumberger Alaska Computing Center
16:21
PAGE:
16
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE · 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION · O01CO1
DATE : 99/03/26
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEAl,ER
FILE NUMBER 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SU~24ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
13892.5 14059.4
LOG HEADER DATA
DATE LOGGED: 08-NOV-98
SOFTWARE:
SURFACE SOFTWARE VERSION: ID5 iA 12
DOWNHOLE SOFTWARE VERSION: 5.0
DATA TYPE (MEMORY or REAL-TIME)'. MEMORY
TD DRILLER (FT) : 14060.0
TOP LOG INTERVAL (FT) : 6500.0
BOTTOM LOG INTERVAL (FT) : 14060.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 51.8
MAXIMUM ANGLE: 63.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GA~k~A RAY
CDR RESISTIVITY
ADN AZIM DENSITY NUETRON
TOOL NUMBER
...........
MWD-10A
CDR-675
ADN-475
LIS ~e Verification Listing
Schlumberger Alaska Computing Center
26-MAR-~J9 16:21
PAGE: 17
IMP
$
RESISTIVITY
IMPULSE - 475
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6. 000
13807.0
BOREHOLE CONDITIONS
MUD TYPE: GEM
MUD DENSITY (LB/G): 10.50
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): O. 303
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT): 0.248
MUD CAKE AT (MT): O. 357
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN1 *************
********* 8.75 in hole **********
Drilled interval: 6640 ft to 13852 ft
Realtime Resistivity - GR data presented
Tool Numbers: CDR751/~iDC210
Software: CDR VSO, MiO VSO
IDEAL VSO ob 68
GR is corrected for bit size and mud weight
************ 6.0 in hole **********
Drilled interval: 13852 ft to 14060 ft
Data from recorded memory
Tool Numbers: IMPO12 & ADN023
Software: ADN V5.1, IMP V5.0
IDEAL V50 la 12
GR is corrected for bit size and mud weight
Washdown data: 13802 ft to 13970 ft
Drilling data: 13970 ft to 14060 ft
THIS FILE CONTAINS THE RAW DATA FOR THE LOWER
PORTION OF BIT RUN #2.
$
LIS FORMAT DATA
LIS '~p~ Verification Listing
Schlumberger Alaska Computing Center
PAGE:
18
** DATA FORMAT SPECIFICATION RECORD
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 156
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 6
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000
TVDE EXP FT O0 000 O0 0 $ 1 1 4 68 0000000000
ROP$ EXP F/HR O0 000 O0 0 $ 1 1 4 68 0000000000
TAB EXP S O0 000 O0 0 5 1 1 4 68 0000000000
TABR EXP S O0 000 O0 0 5 1 1 4 68 0000000000
AIOHEXP OPff4M O0 000 O0 0 $ 1 1 4 68 0000000000
A16H EXP OH~4M O0 000 O0 0 5 1 1 4 68 0000000000
A22H EXP OH~g~ O0 000 O0 0 5 1 1 4 68 0000000000
A28H EXP OHNff4 O0 000 O0 0 5 1 1 4 68 0000000000
A34H EXP OHFff~ O0 000 O0 0 5 1 1 4 68 0000000000
PiOH EXP OB?4M O0 000 O0 0 5 1 1 4 68 0000000000
P16H EXP OH~4M O0 000 O0 0 5 1 1 4 68 0000000000
P22H EXP OHMM O0 000 O0 0 5 1 1 4 68 0000000000
P28H EXP OHlCk~ O0 000 O0 0 5 1 1 4 68 0000000000
P34H EXP OHF~ O0 000 O0 0 5 1 1 4 68 0000000000
GR EXP GAPI O0 000 O0 0 5 1 1 4 68 0000000000
TABD EXP S O0 000 O0 0 5 1 1 4 68 0000000000
RHOB EXP G/C3 O0 000 O0 0 $ 1 1 4 68 0000000000
DRHB EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
DRHL EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
DRHU EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
DRHR EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
PEB EXP O0 000 O0 0 5 1 1 4 68 0000000000
PEL EXP O0 000 O0 0 5 1 1 4 68 0000000000
PEU EXP O0 000 O0 0 5 1 1 4 68 0000000000
PER EXP O0 000 O0 0 5 1 1 4 68 0000000000
LIS %~ Verification Listing
Schlumberger Alaska Computing Center
26-MAR5~ 16:21
PAGE
19
NAME SERV UNIT SERVICE API API API API FILE ArUF~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NIrMB SAMP ELE~ CODE (HEX)
O0 000 O0 0 5 1 1 4 68 0000000000
ROBB EXP G/C3
ROBL EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
ROBUEXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
ROBR EXP G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
UB EXP O0 000 O0 0 5 1 1 4 68 0000000000
DCAL EXP IN O0 000 O0 0 5 1 1 4 68 0000000000
TNRA EXP O0 000 O0 0 5 1 1 4 68 0000000000
RPM EXP RPM O0 000 O0 0 5 1 1 4 68 0000000000
DPHB EXP PU O0 000 O0 0 5 1 1 4 68 0000000000
DPHUEXP PU O0 000 O0 0 5 1 1 4 68 0000000000
DPHL EXP PU O0 000 O0 0 5 1 1 4 68 0000000000
DPHR EXP PU O0 000 O0 0 5 1 1 4 68 0000000000
TNPH EXP PU O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 13892
TABR.EXP 0
A28H. EXP 1
P22H.EXP 2
TABD.EXP 0
DRHU. EXP 0
PEU. EXP 7
ROBU. EXP 2
TNRA.EXP 20
DPHL.EXP 10
DEPT. 14059.
TABR.EXP 6510.
A28H. EXP 2.
P22H. EXP 2.
TABD.EXP 10860.
DRHU. EXP O .
PEU. EXP 5.
ROBU. EXP 2.
TNRA. EX P 18.
DPHL.EXP 5.
500 TVDE.EXP 8843.084 ROP5.EXP 29.950 TAB.EXP
000 AIOH. EXP 2.015 A16H. EXP 1.987 A22H. EXP
983 A34H. EXP 1.974 PIOH. EXP 2.207 P16H. EXP
412 P28H. EXP 2.499 P34H.EXP 2.609 GR.EXP
000 RHOB.EXP 2.488 DRHB.EXP 0.011 DRHL.EXP
027 DRHR.EXP 0.009 PEB.EXP 4.198 PEL.EXP
925 PER.EXP 4.566 ROBB.EXP 2.483 ROBL.EXP
486 ROBR.EXP 2.508 UB.EXP 10.478 DCAL.EXP
651 RPM. EXP 78.000 DPHB.EXP 10.099 DPHU. EXP
371 DPHR.EXP 8.601 TNPH.EXP 40.371
500 TVDE.EXP
000 AiOH. EXP
396 A34H. EXP
776 P28H. EXP
000 RHOB. EXP
055 DRHR . EXP
895 PER.EXP
486 ROBR.EXP
484 RPM. EXP
864 DPHR.EXP
8894. 051
2.418
2 365
2 850
2 537
0 005
3 657
2 541
79 200
6 621
ROPS.EXP
A16H. EXP
PiOH.EXP
P34H.EXP
DRHB.EXP
PEB.EXP
ROBB.EXP
UB.EXP
DPHB.EXP
TNPH.EXP
31.579
2 415
2 660
2 918
-0 006
2 892
2 621
7 589
1 761
35.514
TAB. EXP
A22H. EXP
P16H. EXP
GR. EXP
DRHL. EXP
PEL. EXP
ROBL. EXP
DCAL. EXP
DPHU. EXP
0.000
1.983
2.322
120.040
0.013
5.186
2.479
0.109
9.928
2.092
2.413
2.712
87.139
0.004
3.708
2.553
0.441
9.917
** END OF DATA **
* ALASKA COMPUTING CENTER *
, ,
....... SCHLUMBERGER .......
COMPANY NAME : ARCO ALASKA, INC.
WELL NAME : WB-OSB PB2
FIELD NAME : WEST BEACH
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292281771
REFERENCE NO : 99144
RECEIVED
APR ? 7 1999
0ii & Gas Cons. Oommi~ion
An~mm,qe
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
31 -MAR-19~_JJI5 : 05
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/31
ORIGIN : FLIC
REEL NAME : 99144
CONTINUATION # :
PREVIOUS REEL :
CO~24ENT : ARCO ALASKA, WBO5B PB2, WEST BEACH, API #50-029-22817-71
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/31
ORIGIN · FLIC
TAPE NAME : 99144
CONTINUATION # : 1
PREVIOUS TAPE :
CO~R4ENT : ARCO ALASKA, WBO5B PB2, WEST BEACH, API #50-029-22817-71
TAPE HEADER
WEST BEACH
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL :
FEL:
FWL :
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
BIT RUN 1
99144
ST AMOUR
PEAK
WELL CASING RECORD
1ST STRING
2ND STRING
WB-O5B PB2
500292281771
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
31-MAR-99
BIT RUN 2 BIT RUN 3
25
12N
14E
52.00
52.00
11.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
20.000 80.0
12.250 9.625 6640.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
31-MAR-19~=~/15:05
3RD STRING 8.750
PRODUCTION STRING 6.000
7.000 13807.0
REMARKS:
THIS TAPE CONTAINS THE LDWG FORMATTED IMPULSE LWD DATA
AQUIRED ON ARCO ALASKA'S WB-OSB PB2 WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIJMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUM~!ARY
LDWG TOOL CODE
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
14967.5 13777.0
BASELINE DEPTH
88888.0
14676.5
14637.5
14628.0
14625.5
14604.5
14577.5
14563 5
14559 5
14535 5
14520 5
14517 0
14499 5
14483 0
14477 5
14465 5
14449 0
14443.5
14433.5
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
MWD
88885.5
14674.0
14637.5
14626.0
14623.0
14601.5
14575.5
14563.0
14558.0
14535.0
14516.0
14513.5
14496.5
14478.0
14473.5
14461.0
14446.5
14440.0
14432.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
31 -MAR-19>~=~15 : 05
PAGE:
14417.5
14407.0
14396.5
14393.0
14372.0
14365.5
14362.5
14355.0
14345.0
14328.0
14282.0
14270.5
14259.0
14242 0
14231 0
14212 5
14201 0
14191 5
14176 0
14157 5
14141.0
14121.5
14096.0
14080.0
14067.5
14056.5
14043.5
14031.5
13995.5
13985.5
13966.0
13961.5
13934.0
13920.0
13894.0
13861.5
13853.5
13846.5
13838 5
13828 5
13822 5
13815 0
13808 0
13807 0
13803.5
13795.5
13784.5
13781.0
100.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
14415.5
14404.0
14397.5
14394 0
14372 5
14364 0
14362 0
14355 0
14344 0
14326.0
14281.0
14270.0
14260.5
14242.5
14231.5
14211.0
14199.0
14190.5
14172.0
14158.0
14139.0
14118.5
14090.5
14075.0
14064 0
14052 0
14039 0
14025 0
13991 5
13980 5
13961 5
13957 5
13932.0
13916.5
13890.0
13857.0
13851.0
13842.5
13837.5
13824.5
13821.5
13813.5
13809.5
13807.5
13805.0
13795.5
13787.0
13782.0
101.0
BIT RUN NO. MERGE TOP M~RGE BASE
1 13776.0 13846.0
L 31-MAR-19~lS:05 PAGE: 4
LIS Ta~e~Verification Listing
Schlumberger Alaska Computing Center
MWD 2 13846.0 14346.0
MWD 3 14346.0 14738.0
MWD 4 14738.0 14916.0
$
REMARKS: THIS FILE CONTAINS THE EDITED DATA. THE CURVES ARE
TIED INTO THE SWS MCNL GR DATED 21-FEB-99 USING THE
SHIFTS SHOWN ABOVE. CORRELATIONS ARE MADE FROM THE
14692'(KOP) - 13799', CARRYING THE LAST SHIFT OVER THE
REMAINING INTERVAL. THE RUNS ARE MERGED AT THE DEPTHS
SHOWN ABOVE. THE CURVES ARE CLIPPED AT FIRST AND LAST
VALID READING.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
* * SET TYPE - CHAN * *
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 2911 O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR 2911 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR 2911 O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI 2911 O0 000 O0 0 1 1 1 4 68 0000000000
RPD MWD OHNIM2911 O0 000 O0 0 1 1 1 4 68 0000000000
RPM MWD 0I~4~2911 O0 000 O0 0 1 1 1 4 68 0000000000
RPS MWD OPff4M2911 O0 000 O0 0 1 1 1 4 68 0000000000
~ · 31-MAR-195~ ~5:05 PAGE: 5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
NAME SERV UNIT SERVICE API API API API FILE NUM~ NTJMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
RPX MArD Ok~4~f2911 O0 000 O0 0 1 1 1 4 68 0000000000
RPXXMWD OH~q2911 O0 000 O0 0 1 1 1 4 68 0000000000
RJkD ~ArD OH~ff42911 O0 000 O0 0 1 1 1 4 68 0000000000
RAM MWD Otff46~2911 O0 000 O0 0 1 1 1 4 68 0000000000
RAS ~ 0H~2911 O0 000 O0 0 1 1 1 4 68 0000000000
RAX MWD 0H~4~2911 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 14967.500 FET.MWD 10.228 ROP.I~WD 4.571 GR.MWD
RPD.MWD -999.250 RPM. MWD -999.250 RPS.I~WD -999.250 RPX.ICKfD
RPXX.MWD -999.250 RAD.MWD -999.250 RA2~.~ -999.250 RAS.MWD
RAJf. M h~ -999.250
DEPT. 13777.000 FET.MW]9 -999.250 ROP.MWD -999.250 GR.i~IWD
RPD.MWD -999.250 RPM.MWD -999.250 RPS.~fWD -999.250 RPX.MWD
RPXX.MWD -999.250 RAD.MWD -999.250 tAAM.~ -999.250 RAS.MWD
RAJf. MWD -999.250
-999.250
-999.250
-999.250
134.522
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER
RAW MWD
~ ' 31-MAR-19m~--~5:05 PAGE: 6
LIS Ta~ '-~erification Listing
Schlumberger Alaska Computing Center
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SU~4ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
13764.0 13887.0
LOG HEADER DATA
DATE LOGGED: 16-NOV- 98
SOFTWARE:
SURFACE SOFTWARE VERSION: ID5 IA 12
DOWNHOLE SOFTWARE VERSION: 5.0
DATA TYPE (MEMORY or REAL-TIME): MEMORY
TD DRILLER (FT) : 14971.0
TOP LOG INTERVAL (FT): 13776.0
BOTTOM LOG INTERVAL (FT) : 14971.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE.. 51.8
MAXIMUM ANGLE.. 95.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GA~mlA RAY
IMP RESISTIVITY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~k4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN)
EWR FREQUENCY (HZ)
TOOL NUMBER
IMPULSE-475 012
IMPULSE-475 012
6.000
13807.0
~cs/GEM
10.50
0.317
0.259
O. 362
20000
~ ~ 31-MAR-19~ ~5:05 PAGE: 7
LIS Ta~e~Verification Listing
Schlumberger Alaska Computing Center
REMARKS: ************ RUN3 *************
************ 6 in hole *********
Drilled interval: 13807 to 13887.5 ft
Data from recorded memory.
Tool numbers: IMP 012
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN4 *************
************ 6 in hole *********
Drilled interval: 13887.5 ft to 14401.98 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN5
************ 6 in hole *********
Drilled interval: 14401.98 ft to 14794.45 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN6 *************
************ 6 in hole *********
Drilled interval: 14974.45 ft to 14971.09 ft
Data from recorded memory.
Tool numbers: IMP 030
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
Thanks for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
~ ~ 31-MAR-19>~lS:05 PAGE: 8
LIS Ta~e Verification Listing
Schlumberger Alaska Computing Center
TYPE REPR CODE VALUE
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 2911 O0 000 O0 0 2 1 1 4 68 0000000000
TAB LW1 S 2911 O0 000 O0 0 2 1 1 4 68 0000000000
TVDE LW1 FT 2911 O0 000 O0 0 2 1 1 4 68 0000000000
ROP5 LW1 F/HR 2911 O0 000 O0 0 2 1 1 4 68 0000000000
TABR LW1 S 2911 O0 000 O0 0 2 1 1 4 68 0000000000
AIOH LWl 0H~942911 O0 000 O0 0 2 1 1 4 68 0000000000
A16H LW1 0H~2911 O0 000 O0 0 2 1 1 4 68 0000000000
A22H LW1 0Hi~42911 O0 000 O0 0 2 1 1 4 68 0000000000
A28H LW1 0H~942911 O0 000 O0 0 2 1 1 4 68 0000000000
A34H LWl 0H~I~I2911 O0 000 O0 0 2 1 1 4 68 0000000000
PIOH LW1 OPk~2911 O0 000 O0 0 2 1 1 4 68 0000000000
P16H LW1 0H~942911 O0 000 O0 0 2 1 1 4 68 0000000000
P22H LW1 OPi~k42911 O0 000 O0 0 2 1 1 4 68 0000000000
P28H LW1 0H~4~I2911 O0 000 O0 0 2 1 1 4 68 0000000000
P34H LWl 0H~4~2911 O0 000 O0 0 2 1 1 4 68 0000000000
GR LW1 GAPI 2911 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 13764. 000 TAB. LW1 0. 000 TV-DE. LW1 8749. 092 ROPS. LW1
TABR.LW1 0.000 AIOH. LW1 0.118 A16H. LW1 0.100 A22H. LW1
A28H. LW1 0.100 A34H. LW1 0.100 PiOH.LW1 0.615 P16H. LW1
P22H. LW1 O. 687 P28H.LW1 0.500 P34H. LW1 1. 000 GR.LW1
DEPT. 13887. 000 TAB. LWl 1 . 722 TVDE. LW1 8784. 900 ROP$. LW1
TABR.LW1 5530. 000 AiOH. LW1 300. 000 A16H.LW1 49. 831 A22H.LW1
A28H. LW1 44.157 A34H. LW1 39. 628 PiOH. LW1 40.118 P16H. LW1
P22H. LW1 46. 821 P28H. LW1 46. 383 P34H. LW1 44. 380 GR. LWi
-999.250
0.100
0.682
102.725
39.648
46.694
44.303
61.606
** END OF DATA **
~ 31-MAR-19-~J~'15:05 PAGE: 9
LIS Ta~"Verification Listing
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: O. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
13827.5 14401.5
LOG HEADER DATA
DATE LOGGED: 16-NOV- 98
SOFTWARE:
SURFACE SOFTWARE VERSION: ID5 iA 12
DOWNHOLE SOFTWARE VERSION: 5.0
DATA TYPE (MEMORY or REAL-TIME): MEMORY
TD DRILLER (FT) : 14971.0
TOP LOG INTERVAL (FT) : 13776.0
BOTTOM LOG INTERVAL (FT) : 14971.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 51.8
MAXIMUM ANGLE: 95.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
IMP RESISTIVITY
$
TOOL Ar UMbER
IMPULSE-475 012
IMPULSE-475 012
~ 31-MAR-19b-~15:05 PAGE: 10
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHM~I) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
~:CL/Gm~
10.50
0.350
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN3 *************
************ 6 in hole *********
Drilled interval: 13807 to 13887.5 ft
Data from recorded memory.
Tool numbers: IMP 012
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN 4 *************
************ 6 in hole *********
Drilled interval: 13887.5 ft to 14401.98 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ 6 in hole *********
Drilled interval: 14401.98 ft to 14794.45 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN6 *************
************ 6 in hole *********
Drilled interval: 14974.45 ft to 14971.09 ft
Data from recorded memory.
Tool numbers: IMP 030
,
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
31-MAR-193-~lS:05
PAGE:
11
Software: IMP V5.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
Thanks for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 2911 O0 000 O0 0 3 1 1 4 68 0000000000
TAB LW2 S 2911 O0 000 O0 0 3 1 1 4 68 0000000000
TVDE LW2 FT 2911 O0 000 O0 0 3 1 1 4 68 0000000000
ROP5 LW2 F/HR 2911 O0 000 O0 0 3 1 1 4 68 0000000000
TABR LW2 S 2911 O0 000 O0 0 3 1 1 4 68 0000000000
AIOH LW2 0~2911 O0 000 O0 0 3 1 1 4 68 0000000000
A16H LW2 0H~2911 O0 000 O0 0 3 1 1 4 68 0000000000
A22H LW2 0H~2911 O0 000 O0 0 3 1 1 4 68 0000000000
A28H LW2 0PH~42911 O0 000 O0 0 3 1 1 4 68 0000000000
A34H LW2 0HI~42911 O0 000 O0 0 3 1 1 4 68 0000000000
PIOH LW2 0H~4~2911 O0 000 O0 0 3 1 1 4 68 0000000000
P16H LW2 0HT4~2911 O0 000 O0 0 3 1 1 4 68 0000000000
P22H LW2 0I~4~2911 O0 000 O0 0 3 1 1 4 68 0000000000
P28H LW2 0H~4~42911 O0 000 O0 0 3 1 1 4 68 0000000000
~ 31-MAR-l~>-"15:05 PAGE: 12
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
NAME SERV UNIT SERVICE API API API API FILE NUMB AUJM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
P34H LW2 0HI~I2911 O0 000 O0 0 3 1 1 4 68 0000000000
GR LW2 GAPI 2911 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 13827. 500 TAB.LW2 O. 000 TVDE.LW2 8781. 717 ROPS.LW2
TABR.LW2 0.000 AiOH.LW2 25.512 A16H. LW2 26.336 A22H. LW2
A28H. LW2 32.304 A34H.LW2 34.430 PiOH. LW2 31.147 P16H. LW2
P22H. LW2 32. 416 P28H.LW2 32. 729 P34H. LW2 32. 657 GR.LW2
DEPT. 14401.500 TAB.LW2 9.236 TVDE.LW2 8810.201 ROPS.LW2
TABR.LW2 28590. 000 AiOH.LW2 2. 631 A16H. LW2 2. 797 A22H. LW2
A28H.LW2 3.469 A34H.LW2 3.975 PiOH. LW2 4.255 P16H. LW2
P22H.LW2 7. 775 P28H.LW2 10.239 P34H. LW2 12. 803 GR.LW2
1799.341
28.783
31.788
71.389
10. 689
3. 015
5. 736
116. 269
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE . FLIC
VERSION · O01CO1
DATE · 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: O. 5000
31-MAR-19-~lS:05 PAGE: 13
LIS TaP~ Verification Listing
Schlumberger Alaska Computing Center
FILE SUFk4ARY
VENDOR TOOL CODE START DEPTH
MWD 14337.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) '.
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
14794.0
16-NOV-98
ID5 IA 12
5.0
MEMORY
14971.0
13776.0
14971.0
51.8
95.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GA~zA RAY
IMP RESISTIVITY
$
TOOL NUMBER
IMPULSE-475 012
IMPULSE-475 012
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~I) AT TEMPERATURE (DECF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
KCL/GEM
10.50
0.300
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN)
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS:
************ RON 3 *************
************ 6 in hole *********
Drilled interval: 13807 to 13887.5 ft
~ ~ 31-MAR-l~"lS:05 PAGE: 14
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
Data from recorded memory.
Tool numbers: IMP 012
Software: IMP V5.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN4 *************
************ 6 in hole *********
Drilled interval: 13887.5 ft to 14401.98 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUNS *************
************ 6 in hole *********
Drilled interval: 14401.98 ft to 14794.45 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN 6 *************
************ 6 in hole *********
Drilled interval: 14974.45 ft to 14971.09 ft
Data from recorded memory.
Tool numbers: IMP 030
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
Thanks for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #3.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
* * SET TYPE - 64EB * *
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
~ 31-MAR-19~/15:05 PAGE: 15
LIS Tap~ Verification Listing
Schlumberger Alaska Computing Center
TYPE REPR CODE VALUE
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
..............................
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 2911 O0 000 O0 0 4 1 1 4 68 0000000000
TAB LW3 S 2911 O0 000 O0 0 4 1 1 4 68 0000000000
TVDE LW3 FT 2911 O0 000 O0 0 4 1 1 4 68 0000000000
ROP5 LW3 F/HR 2911 O0 000 O0 0 4 1 1 4 68 0000000000
TABR LW3 S 2911 O0 000 O0 0 4 1 1 4 68 0000000000
AiOH LW3 OH~4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
A16H LW3 OH~4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
A22H LW3 Otff4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
A28H LW3 OH~4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
A34H LW3 O H~4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
PiOH LW3 0H~942911 O0 000 O0 0 4 1 1 4 68 0000000000
P16H LW3 Otff4M2911 O0 000 O0 0 4 1 1 4 68 0000000000
P22H LW3 OHMM2911 O0 000 O0 0 4 1 1 4 68 0000000000
P28H LW3 OHI~M2911 O0 000 O0 0 4 1 1 4 68 0000000000
P34H LW3 OH~M2911 O0 000 O0 0 4 1 1 4 68 0000000000
GR LW3 GAPI 2911 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 14337. 000 TAB. LW3 O. 000 TVDE. LW3 8806. i00 ROPS. LW3
TABR. LW3 O. 000 AiOH. LW3 2. 311 A16H. LW3 2. 888 A22H. LW3
A28H. LW3 3. 986 A34H. LW3 4. 841 Pl OH. LW3 3. 444 P16H. LW3
P22H. LW3 9. 054 P28H. LW3 11. 873 P34H.LW3 13. 882 GR.LW3
DEPT. 14794. 000 TAB.LW3 3. 089 TVDE.LW3 8796. 543 ROP$.LW3
TABR.LW3 9800.000 AIOH. LW3 23.130 A16H.LW3 22.306 A22H. LW3
A28H.LW3 24.912 A34H. LW3 26.038 PiOH.LW3 20.114 P16H. LW3
P22H. LW3 22.133 P28H. LW3 22. 991 P34H. LW3 23. 544 GR. LW3
600.024
3.380
5.711
96.090
19.480
23.316
21.139
99.708
** END OF DATA **
~ 31-MAR-19~'~lS:05 PAGE: 16
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION · O01CO1
DATE · 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: O. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
14731.0 14971.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWArHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAuV~qA RAY
IMP RESISTIVITY
$
16-NOV-98
ID5 iA 12
5.0
~ORY
14971.0
13776.0
14971.0
51.8
95.2
TOOL NI]M~ER
...........
IMPULSE-475 012
IMPULSE-475 012
~ 31-MAR-l~=~'lS:05 PAGE: 17
..
LIS TaPe'verification Listing
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6.000
13807.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (0~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
KCL/GEM
10.50
O. 320
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN3 *************
************ 6 in hole *********
Drilled interval: 13807 to 13887.5 ft
Data from recorded memory.
Tool numbers: IMP 012
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN4 *************
************ 6 in hole *********
Drilled interval: 13887.5 ft to 14401.98 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN5 *************
************ 6 in hole *********
Drilled interval: 14401.98 ft to 14794.45 ft
Data from recorded memory.
Tool numbers: IMP 052
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
************ RUN 6 *************
************ 6 in hole *********
Drilled interval: 14974.45 ft to 14971.09 ft
Data from recorded memory.
Tool numbers: IMP 030
v ? 31-MAR-19~_~.ti5:05 PAGE: 18
LIS Tape'Verification Listing
Schlumberger Alaska Computing Center
Software: IMP VS.0
IDEAL V5 la 12
Gamma ray corrected for bit size and mud weight.
Thanks for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #4.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 2911 O0 000 O0 0 5 1 1 4 68 0000000000
TAB LW4 S 2911 O0 000 O0 0 5 1 1 4 68 0000000000
TVDE LW4 FT 2911 O0 000 O0 0 5 1 1 4 68 0000000000
ROP5 LW4 F/HR 2911 O0 000 O0 0 5 1 1 4 68 0000000000
TABR LW4 S 2911 O0 000 O0 0 $ 1 1 4 68 0000000000
AIOH LW4 OPiM~2911 O0 000 O0 0 5 1 1 4 68 0000000000
A16H LW4 OPiMM2911 O0 000 O0 0 5 1 1 4 68 0000000000
A22H LW4 0H~4~2911 O0 000 O0 0 5 1 1 4 68 0000000000
A28H LW4 OH~4M2911 O0 000 O0 0 $ 1 1 4 68 0000000000
A34H LW4 OHI~q2911 O0 000 O0 0 $ 1 1 4 68 0000000000
PIOH LW4 OHMM 2911 O0 000 O0 0 5 1 1 4 68 0000000000
P16H LW4 OH~q 2911 O0 000 O0 0 5 1 1 4 68 0000000000
P22H LW4 Ot{MM2911 O0 000 O0 0 5 1 1 4 68 0000000000
P28H LW4 0tflv~42911 O0 000 O0 0 5 1 1 4 68 0000000000
..
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
31 -MAR-I~V l5: 05
PAGE:
19
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX)
P34H LW4 0H~42911 O0 000 O0 0 5 1 1 4 68 0000000000
GR LW4 GAPI 2911 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 14731. 000 TAB.LW4 O. 000 TVDE.LW4 8796. 408 ROPS. LW4
TABR.LW4 O. 000 AiOH.LW4 300. 000 A16H.LW4 300. 000 A22H. LW4
A28H. LW4 40.207 A34H.LW4 34.412 PiOH.LW4 20.160 P16H. LW4
P22H. LW4 22. 313 P28H. LW4 23. 071 P34H. LW4 23. 214 GR. LW4
DEPT. 14971. 000 TAB.LW4 11. 442 TVDE.LW4 8799. 076 ROPS.LW4
TABR.LW4 36830. 000 AiOH.LW4 5. 076 A16H. LW4 6. 377 A22H. LW4
A28H.LW4 12. 172 A34H.LW4 23. 015 PiOH.LW4 8.144 P16H. LW4
P22H. LW4 36. 736 P28H.LW4 199. 028 P34H.LW4 1000. 000 GR.LW4
-999.250
72.311
21.193
97.588
4.057
8.004
15.431
343.204
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION · O01CO1
DATE : 99/03/31
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 99/03/31
ORIGIN · FLIC
TAPE NAME : 99144
CONTINUATION # : 1
PREVIOUS TAPE :
COM~ENT : ARCO ALASKA, WBOSB PB2, WEST BEACH, API #50-029-22817-71
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE · 99/03/31
ORIGIN : FLIC
REEL NAME : 99144
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA, WBO5B PB2, WEST BEACH, API #50-029-22817-71
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER .......
COMPANY NAME : ARCO ALASKA INC.
WELL NAME : WB-OSB
FIELD NAME : WEST BEACH
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292281702
REFERENCE NO : 99141
RECEiV
~A~ 2 6 199'9
LIS Taper Verification Listing
Schlumberger Alaska Computing Center
24-MAR-l~-'~'15 :23
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/24
ORIGIN : FLIC
REEL NAME : 99141
CONTINUATION # :
PREVIOUS REEL :
CO~94ENT : ARCO ALASKA, WEST BEACH, WB-OSB, API #50-029-22817-02
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 99/03/24
ORIGIN : FLIC
TAPE NAME : 99141
CONTINUATION # : 1
PREVIOUS TAPE :
CO~4MENT · ARCO ALASKA, WEST BEACH, WB-O5B, API #50-029-22817-02
TAPE HEADER
WEST BEACH
CASED HOLE WIRELINE LOGS
WELL NAME: WB-OSB
API NUMBER: 500292281702
OPERATOR: ARCO ALASKA INC.
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 24-MAR-99
JOB NUMBER: 99141
LOGGING ENGINEER: NELSON
OPERATOR WITNESS: CISMOSKI
SURFACE LOCATION
SECTION: 25
TOWNSHIP: 12N
RANGE: 14E
FNL :
FSL: 104
FEL: 3219
FWL :
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 52. O0
DERRICK FLOOR: 52. O0
GROUND LEVEL: 11.50
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 7. 000 13812.0 26. O0
2ND STRING 4. 500 16098.0 12.60
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LIS TapS'verification Listing
Schlumberger Alaska Computing Center
24_MAR_l~9~'J'lS :23
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
$
REMARKS:
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNT
..............
THIS TAPE CONTAINS THE LDWG FORMATTED MCNL DATA AQUIRED
ON ARCO ALASKA'S WB-OSB WELL. THIS LOG IS THE PDC.
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE ' FLIC
VERSION · O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0. 5000
FILE SUSfiVZARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 16010.0 13334.0
CNT 16008.0 13334.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
..............
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNT
REMARKS: THIS FILE CONTAINS THE EDITED MAIN PASS DATA. THE
CURVES ARE CLIPPED AT FIRST AND LAST VALID READINGS.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-19~ 15:23
PAGE:
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NtrM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNT GAPI 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNT CPS 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNT CPS 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNT 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNT V 1168670 O0 000 O0 0 1 1 1 4 68 0000000000
* * DA TA * *
DEPT. 16010.000 GRCH. CNT 50.613
NRAT. CNT -999.250 CCL. CNT -999.250
DEPT. 13334.000 GRCH. CNT 32.720
NRAT. CNT 33.791 CCL. CNT 85.000
NCNT. CNT -999. 250 FCNT. CNT -999. 250
NCNT. CNT 2659. 447 FCNT. CArT 93.290
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-199~ 15:23
PAGE:
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE . 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE 1 v-UMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS ArUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUF~4ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 16005.5 13357.5
CNT 16003.0 13358.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS AFUMBER: 1
.......... EQUIVALENT UNSHIFTED DEPTH ..........
BASELINE DEPTH GRCH CNT
88888.0 88883.5 88883.0
16005.5 16001.0
16000.0 15995.0
15983.0 15979.0
15977.5 15973.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
15967.5 15964.0
15942.0 15937.5
15923.5 15923.5
15912.0 15908.5
15899.0 15897.0
15898.0 15896.0
15872.0 15871.5
15868.5 15867.5
15867.0 15865.5
15847.5 15845.0
15843.0 15841.5
15835.0 15831.5
15829.0 15826.5
15824.5 15826.5
15819.5 15818.0
15812.0 15812.5
15808.0 15805.5
15786.5 15785.5
15782.5 15782.5
15764.0 15762.0
15759.5 15759.5
15755.5 15752.5
15736.5 15735.5
15729.0 15729.0
15723.0 15722.5
15698.5 15703.0
15678.0 15677.0
15671.5 15668.5
15669.5 15665.5
15649.5 15654.0
15634.0 15629.5
15633.0 15627.5
15625.0 15620.0
15621.5 15623.5
15599.0 15594.0 15601.0
15568.5 15566.0
15566.5 15566.5
15560.5 15558.5
15556.5 15556.5
15540.5 15540.0
15535.5 15534.0
15529.5 15526.5
15520.0 15515.5
15511.0 15505.0
15494.0 15491.0
15474.5 15473.5
15472.5 15473.0
15469.5 15468.5
15457.0 15457.0
15436.5 15436.0
15433.5 15433.5
15414.0 15413.5
15412.5 15414.5
15402.0 15402.0
15396.0 15397.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
PAGE:
15393.5
15380.5
15371.5
15356.0
15332.0
15331.5
15322.5
15313.5
15305.5
15302.5
15293.5
15293.0
15273.5
15265.0
15250.5
15248.5
15238.0
15235.0
15211.0
15196.0
15190.5
15161.0
15143.0
15142 0
15129 5
15125 0
15116 0
15115 5
15102 5
15100 5
15068.0
15060.5
15041.5
15033.0
15027 0
15013 5
15007 0
15001 5
14978 0
14975 0
14968 0
14961 0
14953 0
14934 0
14932 5
14921 0
14919 0
14914 5
14912 0
14883 5
14877 5
14872 5
14869 0
14867 5
14843 5
15382.0
15370.5
15356.0
15331.5
15300.5
15288.0
15270.0
15247.0
15231.0
15205.5
15192.5
15157.5
15140.0
15121.0
15112.0
15100.5
15066.5
15059.5
15040.5
15025.0
15009.5
14998.0
14970.0
14954.5
14934.5
14921.5
14913.0
14882.0
14876.0
14871.5
14844.5
15395.0
15334.5
15322.5
15313.5
15307.0
15295.5
15266.0
15248.5
15239.0
15191.5
15144.0
15129.5
15115.0
15098.5
15031.5
15007.0
14973.5
14965.0
14959.5
14930.0
14919.5
14914.5
14882.0
14867.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
14817.5
14814.5
14799.0
14784.0
14777 0
14768 5
14766 5
14754 5
14734 0
14722 5
14710 5
14707 5
14672 5
14666 0
14657 0
14644 0
14636 5
14634 5
14627 5
14615 0
14609 0
14591 0
14582 0
14573 0
14564 5
14560 0
14559.0
14551.0
14535.0
14517.5
14515.0
14502.0
14499.5
14494.5
14483.0
14479.0
14472.5
14462.0
14444.5
14441.5
14439.0
14423.0
14421.0
14419.5
14404.5
14401.5
14398.0
14397.0
14386.5
14385.0
14382.0
14379.5
14363.5
14359.0
14356.5
14816.0
14797.0
14782.5
14767.5
14755.5
14734.5
14710.5
14670.5
14642.5
14631.5
14612.5
14579.0
14558.0
14516.0
14514.5
14501.0
14496.5
14477.0
14470.0
14461.0
14444.5
14440.0
14417.5
14397.0
14387.5
14385.5
14362.0
14815.0
14774.5
14765.5
14720.5
14706.0
14660.0
14652.5
14632.0
14622.5
14604.0
14587.5
14572.0
14563.5
14559.5
14550.0
14537.0
14500.0
14484.0
14474.5
14440.0
14424.0
14418.5
14405.0
14403.5
14398.0
14383.5
14381.5
14362.5
14356.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
14342.0
14339.0
14325.5
14321.0
14319.5
14311.5
14306.0
14294.5
14284.0
14272.0
14269.5
14260.5
14256.0
14248.5
14233.0
14199.5
14197 5
14155 5
14151 0
14149 0
14138 5
14131 0
14126 0
14122 0
14115 0
14097.0
14093.5
14086.0
14071.0
14070.5
14066.5
14059.5
14052.5
14048.5
14030.5
14024.0
14009.5
13992.5
13990.5
13981.0
13963.5
13958.0
13943.0
13937.5
13931.5
13924.5
13917.0
13915 0
13907 0
13892 5
13892 0
13887 0
13885 5
13874 0
13872 5
14326.0
14320.5
14311.5
14284.0
14267.5
14260.5
14245.5
14231.0
14197.0
14154.5
14147.5
14139.0
14122.5
14096.5
14086.5
14072.5
14068.0
14054.5
14026.5
14011.0
13991.0
13982.5
13965.5
13960.0
13932.0
13924.5
13916.5
13908.0
13890.0
13881.5
13869.5
14340.5
14338.5
14321.5
14307.0
14295.5
14272.5
14255.0
14199.0
14151.5
14130.5
14125.5
14115.5
14092.0
14070.5
14057.5
14045.0
14029.0
13993.0
13941.5
13935.0
13914.0
13892.5
13886.5
13873.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
13860.5
13859.5
13857.0
13855.0
13854.0
13846.0
13839.0
13836.0
13828.5
13825.0
13823.0
13811 5
13810 0
13809 0
13805 5
13797 0
13791 5
13790 5
13784 0
13782.0
13781.5
13779.5
13778.5
13767.0
13765.5
13762.5
13752.5
13745.5
13740.5
13737.5
13730.5
13728.0
13727.0
13712.0
13709.0
13708.5
13694 0
13690 5
13688 5
13684 5
13676 0
13668 0
13663 0
13662 0
13659.5
13645.0
13639.5
13634.5
13626.0
13615.5
13615.0
13611.5
13605.5
13597.5
13594.5
13859.0
13851.0
13837.5
13825.5
13821.5
13809.5
13807.5
13803.0
13796.0
13790.5
13787.0
13782.0
13781.0
13778.0
13767.0
13745.5
13738.5
13730.0
13727.0
13706.0
13693.5
13686.0
13 659.5
13638.0
13614.0
13612.0
13602.5
13596.5
13591.5
13858.5
13856.0
13851.0
13842.5
13832.5
13820.5
13808.5
13780.0
13776.0
13764.5
13760.0
13751.0
13736.0
13725.0
13709.5
13707.5
13689.0
13684.5
13675.0
13667.0
13663.0
13659.0
13643.0
13632.0
13621.0
13607.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-19~"15:23
PAGE: 10
13591.0
13587.0
13581.0
13577.0
13574.0
13568.0
13553.0
13544.5
13544.0
13540.0
13538.5
13530.5
13519 0
13518 5
13510 0
13505 0
13500 5
13498 0
13490 0
13486 5
13485 0
13476.0
13473.0
13470.0
13463.5
13428.5
13421.0
13410.0
13406.0
13403.0
13397.0
13392.0
13382.0
13374.0
13372.0
100.0
$
13589.0
13575.0
13570.5
13551.5
13542.5
13538.0
13528.5
13517.0
13508.0
13498.5
13486.5
13484.0
13474.0
13460.5
13426.0
13418.0
13400.5
13389.0
13369.5
97.5
13581.5
13573.0
13567.0
13543.5
13535.5
13513.5
13503.5
13495.5
13483.5
13474.0
13470.0
13422.5
13405.5
13402.5
13396.5
13379.0
13372.0
98.0
REMARKS: THIS FILE CONTAINS THE MCNL REPEAT PASS. THE DEPTH
SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH
REPEAT PASS AND GRCH MAIN PASS, ALSO NRAT REPEAT PASS
AND NRST MAIN PASS, CARRYING ALL MCNL CURVES WITH THE
NRAT SHIFTS.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE: 11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CI~SS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CNT GAPI 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
NCNT CNT CPS 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
FCNT CNT CPS 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNT 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNT V 1168670 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 16005.500 GRCH. CNT 39.954 NCNT. CNT -999.250 FCNT. CNT -999.250
NRAT. CNT -999.250 CCL.CNT -999.250
DEPT. 13357.500 GRCH. CNT 36.289 NCNT. CNT -999.250 FCNT. CNT -999.250
NRAT. CNT -999.250 CCL.CNT -999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
12
**** FILE TRAILER ****
FILE NAME : EDIT . 002
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 3
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
1, 2,
CNT
$
RENARKS:
THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF THE MAIN
AND REPEAT PASSES. THE DATA WAS CLIPPED AND DEPTH
SHIFTED BEFORE THE AVERAGE WAS CALCULATED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
24-MAR-1999 15:23
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
PAGE:
12
* * * * FILE TRAILER * * * *
FILE NAME : EDIT . 002
SERVICE : FLIC
VERSION · O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAET FILE :
FILE HEADER
FILE NUMBER: 3
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
1, 2,
CNT
$
REMARKS
THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF THE MAIN
AND REPEAT PASSES. THE DATA WAS CLIPPED AND DEPTH
SHIFTED BEFORE THE AVERAGE WAS CALCULATED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE: 13
TYPE REPR CODE VALUE
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1168670 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNT GAPI 1168670 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNAV CPS 1168670 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNAV CPS 1168670 O0 000 O0 0 3 1 1 4 68 0000000000
NRAT CNAV 1168670 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 16010.000 GRCH. CNT
NRAT. CNAV -999.250
DEPT. 13334.000 GRCH. CNT
NRAT. CNAV -999.250
50.613 NCNT. CNAV -999.250 FCNT. CNAV -999.250
32.720 NCNT. CNAV -999.250 FCNT. CNAV -999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION · O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
14
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.1000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MCNL 16026.0
$
LOG HEADER DATA
STOP DEPTH
13318.5
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO)
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
MCNL MEMORY COMP NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
21-FEB-99
RELOO35E
16100.0
16025.0
13334.0
16008.0
TOOL NUMBER
MGR 18
LTTN Al3
16098.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24_MAR_19"9--9~lS:23
PAGE:
15
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO ..
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY..
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) '. 60
FAR COUNT RATE HIGH SCALE (CPS) '. 2010
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 37000
TOOL STANDOFF (IN) '.
REMARKS: CORRELATED DEPTH TO SLB ANADRILL CDR/IMPULSE 16-0CT-98
THIS FILE CONTAINS THE RAW MAIN PASS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.1
9 65 FT
ll 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1999 15:23
PAGE:
16
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE ~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELEM CODE (HEX)
DEPT FT 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
CVEL PS1 F/HR 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
GR PS1 GAPI 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
NCNT PS1 CPS 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
FCNT PS1 CPS 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
NRAT PS1 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
CCLD PS1 V 1168670 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 16026.000 CVEL.PS1 2.036 GR.PS1 -999.250 NCNT. PS1
FCNT. PS1 -999.250 NURAT. PS1 -999.250 CCLD.PS1 -999.250
DEPT. 13318.500 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT.PS1
FCNT. PS1 -999.250 NRAT. PS1 -999.250 CCLD.PS1 85.000
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE · 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE N-OAfBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASSNTJMBER: 2
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
PAGE:
17
MCNL
$
LOG HEADER DATA
DEPTH INCREMENT: O. 1000
FILE SUM~zAugY
VENDOR TOOL CODE START DEPTH
16034. $
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO) :
STOP DEPTH
13337.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
MCNL MEMORY COMP NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THE~):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 60
2i-FEB-99
RELOO35E
16100.0
16025.0
13334.0
16008.0
TOOL NUMBER
MGR 18
LTTNA13
16098.0
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-19b~J'15:23
PAGE:
18
FAR COUNT RATE HIGH SCALE (CPS): 2010
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 37000
TOOL STANDOFF (IN):
REMARKS: CORRELATED DEPTH TO SLB ANADRILL CDR/IMPULSE 16-0CT-98
THIS FILE CONTAINS THE RAW REPEAT PASS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.1
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX)
DEPT FT 1168670 O0 000 O0 0 $ 1 1 4 68 0000000000
CVEL PS2 F/HR 1168670 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS2 GAPI 1168670 O0 000 O0 0 $ 1 1 4 68 0000000000
NCNT PS2 CPS 1168670 O0 000 O0 0 5 1 1 4 68 0000000000
FCNT PS2 CPS 1168670 O0 000 O0 0 5 1 1 4 68 0000000000
NRAT PS2 1168670 O0 000 O0 0 5 1 1 4 68 0000000000
CCLD PS2 V 1168670 O0 000 O0 0 $ 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-l~'lS:23
PAGE:
19
DEPT. 16034.500 CVEL.PS2
FCNT. PS2 -999.250 NRAT. PS2
DEPT. 13337.500 CVEL.PS2
FCNT. PS2 -999.250 NRAT. PS2
4.031 GR.PS2
-999.250 CCLD.PS2
-999.250 GR.PS2
-999.250 CCLD. PS2
-999.250 NCNT. PS2
-999.250
~999.250 NCNT. PS2
85.000
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 99/03/24
ORIGIN : FLIC
TAPE NAME : 99141
CONTINUATION # : 1
PREVIOUS TAPE :
CO~94ENT : ARCO ALASKA, WEST BEACH, WB-OSB, API #50-029-22817-02
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 99/03/24
ORIGIN ' FLIC
REEL NAME : 99141
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA, WEST BEACH, WB-OSB, API #50-029-22817-02