Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-130CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. From:Stefan Reed To:McLellan, Bryan J (OGC) Cc:Donna Ambruz Subject:RE: [EXTERNAL] RE: KBU 24-06RD N2 Test Date:Wednesday, April 2, 2025 11:16:53 AM Attachments:image001.png Bryan, Yes, we tagged TOC yesterday w/ slickline @ 3811’KB and it was witnessed by Sully Sullivan. Regards, Stefan Reed Operations Engineer Kenai Asset Team Cell: 206-518-0400 Hilcorp Alaska, LLC From: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Sent: Wednesday, April 2, 2025 11:00 AM To: Stefan Reed <Stefan.Reed@hilcorp.com> Cc: Donna Ambruz <dambruz@hilcorp.com> Subject: [EXTERNAL] RE: KBU 24-06RD N2 Test Hi Stefen. The test results look good with ~14 psi drop over 72 hrs amounting to 0.7%. Did you tag the top of cement? If so, how much cement height was present? Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission Bryan.mclellan@alaska.gov +1 (907) 250-9193 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From: Stefan Reed <Stefan.Reed@hilcorp.com> Sent: Wednesday, April 2, 2025 7:53 AM To: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Cc: Donna Ambruz <dambruz@hilcorp.com> Subject: KBU 24-06RD N2 Test Bryan, Attached is the crystal gauge recording for the plug verification on KBU 24-06RD using N2. Due to some fitting leaks and the IA sensor not being hooked up properly we didn’t start the 72 hours test until 18:07 on 28-Mar-2025 (T/I/O = 2443/0.8/72psi) and ended on 31-Mar-2025 @ 18:07 (2429/1.2/72psi). We left pressure on the well with the gauge connected until state witness arrived on 1-April-2025 @ 12:00. The tubing pressure anomaly on 1-April-2025 was due to the gauge being shut in for service company PCE removal/installation. Let me know if you have any questions. Regards, Stefan Reed Operations Engineer Kenai Asset Team Cell: 206-518-0400 Hilcorp Alaska, LLC The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. -500050010001500200025003000-0.6-0.4-0.20.00.20.40.60.81.01.21.4PSI G InnerPSI G Outer24-6rd Completed 26-Mar-25 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:McLellan, Bryan J (OGC) To:Stefan Reed Cc:Donna Ambruz Subject:RE: 24-06RD (PTD# 206-013) Date:Wednesday, April 2, 2025 12:21:00 PM Attachments:image003.png Stefan, Thanks for the update. Change to perf depth is approved. Regards Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission Bryan.mclellan@alaska.gov +1 (907) 250-9193 From: Stefan Reed <Stefan.Reed@hilcorp.com> Sent: Wednesday, April 2, 2025 11:37 AM To: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Cc: Donna Ambruz <dambruz@hilcorp.com> Subject: 24-06RD (PTD# 206-013) Bryan, Just wanted to let you know we made a small shift to our perf depths in the A11 sand to 3772’-3802’ MD ( sundry depths - ±3,778’-±3808’ MD) Regards, Stefan Reed Operations Engineer Kenai Asset Team Cell: 206-518-0400 Hilcorp Alaska, LLC The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. I age jest ell Hist®ry sle r age xHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~ ~ - 1~ ~ Well History File Identifier Or anizing (done) ^ Two-sided II I II') II I~ 1I I II III ^ Rescan Needed II I II II II II I I II I III 9- RES AN DIG TAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. i ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria ' Date: /s/ Pro'ect Proofin II(IIIIII IIIII II III ! g ^ n/~ 6Y: Maria Date: ~ ~ ~ /s/ 'Y 1 I Scanning Preparation ~._ x 30 = ~~ + 1~ =TOTAL PAGES (Count does not include cover sh et) dY: Maria ~ Date: ~/~'X,~ I ~~ /s/ Production Scanning Stage 1 Page Count from Scanned File: `~ (Count does include cover sheet) Pa a Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ c~ ~ ~ ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scannin is com lets at this point unless rescanning is required. II I II ~I II III II IIIII 9 P ReScanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III IIII~I~IIII~IIII P 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) inc. .. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 501, AUG 120 Mr. Jim Regg Alaska Oil and Gas Conservation Commission e o 13 ( 1 333 West 7 Avenue Anchorage, Alaska 99501 .g-- Subject: Corrosion Inhibitor Treatments of GPB A -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad A that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • i BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) A -Pad Date: 04/15/2012 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal A -01A 2012420 50029201080100 1.3 NA 1.3 NA 11.10 7/21/2009 A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009 A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009 A -04 1720060 50029201150000 0.0 NA NA NA NA NA A -05A 2061280 50029201160100 0.0 NA NA NA NA NA A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009 A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009 A -08 1740040 50029201320000 No conductor NA NA NA NA NA A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009 A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009 A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009 A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009 A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012 A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009 A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009 A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009 A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009 A -18 1921070 50029206300100 SC leak NA NA NA NA NA A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009 A -20 1820130 50029207090000 0.8 NA 0.8 NA 5.10 7/20/2009 A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009 A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009 A -24 1820700 50029207430000 29.0 5.8 0.1 11/27/2009 1.70 3/18/2010 A -25A 2011480 50029207640100 0.3 NA 0.3 NA 1.70 8/13/2009 A -26L1 1971060 50029207946000 0.3 NA 0.3 NA 1.70 7/21/2009 A -27A 1982350 50029208090100 7.5 NA 7.5 NA 71.40 7/20/2009 A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009 A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009 A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009 A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009 A -32A 1990580 50029213950100 2.0 NA 2.0 NA 17.00 4/11/2012 A -33 1851830 50029214100000 0.8 NA 0.8 NA 3.40 8/12/2009 A -34A 1851050 50029213390100 4.4 NA 4.4 NA 28.90 7/22/2009 A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009 A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012 A -39 1930280 50029223440000 0.5 NA 0.5 NA 3.40 7/21/2009 A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009 A -41 1941580 50029225300000 SC leak NA NA NA NA NA --, A -42A 2061300 50029225420100 0.6 NA 0.6 _ NA 5.10 7/20/2009 A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009 A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009 STATE OF ALASKA `�C RECEIVED ED ALASKA AND GAS CONSERVATION COMMISSIO FEB 2 8 201' REPORT OF SUNDRY WELL OPERATIONS ` 0" 81 G* Cain_ C nission 1. Operations Abandon L Repair Well L Plug Perforations Li Stimulate 11 t er Li Performed: Alter Casing ❑ Pull Tubing p Perforate New Pool ❑ Waiver ❑ Time Extension ❑ -Anchora Change Approved Program ❑ Operat. Shutdown ❑ Perforate 0 ' Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development El ' Exploratory 0 206- 130 -0- 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 22542 -01 -00 - 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0047472 ' PBU A -42A 9. Field /Pool(s): PRUDHOE BAY, PRUDHOE OIL - 10. Present Well Condition Summary: Total Depth measured 14110' feet Plugs measured None feet true vertical 9010 - feet Junk measured None feet Effective Depth measured 14070 - feet Packer measured 12937 feet true vertical 9013.66 - feet true vertical 8813 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H-40 36 - 116 36 - 116 1490 470 Surface 3124 10 -3/4" 45.5# NT -80 35 - 3124 35 - 3114 5210 2480 Production 13195 7 -5/8" 29.7# L -80 32 - 13195 32 - 8946 6890 4790 Liner 137 4 -1/2" 12.6# L -80 13071 - 13208 8883 - 8951 8430 7500 Liner 1171 3- 1/2 "X3- 3/16 "X2 -7/8" 12938 - 14110 8814 - 9010 9.3 #/6.2 #16.4# Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet gR la r , Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 30 - 12984 30 - 8837 Packers and SSSV (type, measured and true vertical depth) 3 -1/2" TIW Packer 12937 8813 Packer None None None SSV 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 12. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 104 1198 404 0 163 Subsequent to operation: 123 1271 623 0 173 13. Attachments: 14. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 0 - Service ❑ Stratigraphic ❑ Daily Report of Well Operations 15. Well Status after work: Oil IS- Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Joe Lastufka Prepared by Joe Lastufka 564 -4091 Printed ai oe L.. IS` ( Title Data Manager Signaturl'ai1L Phone 564 -4091 Date 2/25/2011 ,•,.„ W - vi Form 10-404 Revised 10/2010 4 Submi Original Only A-42A 206 -130 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base A-42A 3/24/07 PER 13,688. 13,828. 9,055.92 9,037.7 A-42A 3/24/07 PER 13,848. 13,908. 9,034.94 9,027.82 A-42A 3/24/07 PER 14,028. 14,068. 9,017.08 9,013.85 A-42A 6/7/08 BPS 12,927. 12,930. 8,808.19 8,809.73 A-42A 10/17/08 BPP 12,927. 12,930. 8,808.19 8,809.73 A-42A 1/7/11 APF 14,018. 14,043. 9,017.79 9,015.96 A-42A 1/7/11 APF 13,650. 13,675. 9,061.9 9,057.82 A-42A 1/7/11 APF 13,883. 13,908. 9,030.66 9,027.82 A-42A 1/8/11 APF 13,845. 13,870. 9,035.34 9,032.19 A-42A 1/27/11 APF t/ 13,375. - - 13,400. 9,045.09 9,053.65 A-42A 1/28/11 APF 13,315. - - 13,340. 9,013.87 9,028.45 • AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • A -42A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1/27/2011 CTU #9 Job scope = BOP test, Add Perf= Perforate (gun #5): 13375'- 13400' ** *Job continued on 1/28/2011 E � 1/28/2011 CTU #9, Job Scope = Add Perf 1 Perforate (gun #6): 13315'-13340', 2" PJ Omega, 6 spf. RDMO. !Job Complete 3 1 , FLUID SUMMARY NO FLUIDS USED TREE = 4" CNV FLC • WELLHEAD= • FMC • SAFETY NOTES LLBORE >70° @ 13400' * ** *WARNING: MUST TURN 0 DIO TRANSMITTER IN WEATHER KB EL ELEV = 85.5' ACTUATOR= BAKER A �4, 2 A MONITORING SHACK BEFORE ANY WELLWORK INVOLVING KB. EL BF. ELEV = 54.67' EXPLOSIVES BEGINS. CONTACT PAD OPER. KOP = 3200' Max Angle = 100 °@ 13662' 1 2197' H4 -1 /2" HES HXO SSSV, ID = 3.813" I Datum MD = 13077' Datum TVDss= 8800' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 110 -3/4" CSG, 45.5 #, NT -80 BTC, ID = 9.950" I J ( 3124' 4 3007 2998 8 KBMG DOME BK 16 12/30/07 En 3 6350 5372 59 KBMG DOME BK 16 08/07/07 2 10185 7366 59 KBMG DOME BK 16 10/17/08 1 12818 8752 59 KBMG SO BK _ 22 10/17/08 Minimum ID = 2.786" @ 13010' 3-1/2" X 3 -3/16" XO (PIN ID) I 12927' I--I4 -112" HES X NIP, ID = 3.813" I I Q I � � : 12937' H 7 -5/8" X 4 -1/2" TIW HBBF -T PKR, ID = 3.917" 1 'TOP OF CEMENT (03/24/07 TAGGED) 1--1 12937' I pi, , I 12939' - 13.70" BOT DEPLOY SLV, ID = 3.00" 1 (TOP OF 3- 3/16" LNR 1 12937' i 1 12945' I - 13.70" X 3 -1/2" XO, ID = 2.992" • • 1 12961' 1 - 14 - 1/2" HES X NIP, ID = 3.813" I BEHIND 12972' I 4 -1/2" HES XN NIP, ID = 3.80" PIPE 1 MILLED OUT (12/17/06) t • t ! 12980' H3-1/2" HOWCO X NIP, ID = 2.813" 1 ► i 4 -1/2" TBG, 12.6 #, L -80 NSCT, -1 12984' ' 12984'J 14 - 1/2" WLEG, ID, 3.958" 1 .0152 bpf, ID = 3.958" '•••j ' •••••4 , • • • • 4 1 12967 H ELMD TT LOGGED 03/25/95 1 • •• • •• ••• � •••• • *• •• ■• 4 3 -1/2" LNR, 9.3 #, L-80 STL, 13010' ���41 !••••••■ 13010' I - 13 - 1/2" X 3- 3/16" XO, ID = 2.786" ( 0087 bpf, ID = 2.992" i••�•∎ %•••� •.+.'. • i • • + , • 4 1 7 -5/8" CSG, 29.7 #, L -80 NSCC, ID = 6.875" I-1 13195' �i� � 13080' 117 -5/8" X 4 -1/2" TM/ SS HIGH ANGLE PERFORATION SUMMARY •, .� HGR/PKR, ID = 4.00" REF LOG: MGR/CCL ON 03/23/07 , • • ANGLE AT TOP PERF: 52° @ 13315' •� • .• • Note: Refer to Production DB for historical perf data •� SIZE SPF INTERVAL Opn /Sqz DATE • i ,• • 3.80" MILLOUT WINDOW (A -42A) 13208' - 13215' 2" 6 13315 - 13340 0 01/28/11 is �i - 2" 6 13375 - 13400 0 01/27/11 '�` ` 2" 6 13650 - 13675 0 01/07/11 ' � •, 2" 6 13688 - 13828 0 03/24/07 ..... • , 2" 6 13845 13870 0 01/08/11 • i�i • i • i∎ 14107' - 3- 3/16" X 2 -7/8" 2" 6 13848 - 13908 0 03/24/07 • 2" 6 13883 - 13908 0 01/07/11 Q.• ___ 11111111%* X0, ID = 2.387" 2" 6 14018 - 14043 0 01/07/11 !� 2" 6 14028 - 14068 0 03/24/07 PBTD 1—L 14070' ' 4 ••• •• • • 13 -3/16" LNR, 6.2 #, L- 80 .0076 bpf, ID = 2.80" 1-I 14107' I 14 -1/2 WHIPSTOCK (03/17/07) I 13208' 12 -7/8" LNR 6.4 #, L -80 STL, .0058 bpf, ID = 2.441" H 14110' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 2/4/1995 ORIGINAL COMPLETION WELL: A -42A 03/26/07 NORDIC 1 CTD "A -42A" PERMIT No: 2061300 10/19/10 LRD/ PJC PULL PX (10/17/08) API No: 50- 029 - 22542 -01 02/12/11 JGF /PJC PERFS (01/07- 01/28/11) SEC 35, T11N, R13E, 2263' FSL & 1703' FEL BP Exploration (Alaska) STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSI. " REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing ❑ Pull TubinJ Perforate New Pool ❑ Waived] Time Extension ❑ Change Approved Program ❑ Operat. Shutdowr❑ Perforate El Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 0 Exploratory ❑ - 206 -1300 3. Address: P.O. Box 196612 Stratigraphic0 Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 22542 -01 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 047472 ., PBU A -42A 10. Field /Pool(s): - PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 14110 feet Plugs (measured) None feet true vertical 9010 feet Junk (measured) None feet Effective Depth measured 14070 feet Packer (measured) 12937 feet true vertical 9013.66 feet (true vertical) 8813 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 91.5# H-40 SURFACE - 110 SURFACE - 110 1490 470 Surface 3124' 10 -3/4" 45.5# NT -80 35 - 3124 35 - 3114 5210 2480 Intermediate 13195' 7 -5/8" 29.7# L -80 32 - 13195 32 - 8946 6890 4790 Production 128' 4 -1/2" 12.6# L -80 13080 - 13208 8887 - 8951 8430 7500 Liner 1171' 3- 1/2 "X3- 3/16 "X2 -7/8" 12938 - 14110 8814 - 9010 Liner 9.3 #/6.2 #/6.4# Perforation depth: Measured depth: SEE ATTACHED - _ True Vertical depth: _ - _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 SURFACE - 12984 SURFACE - 8837 Packers and SSSV (type, measured and true vertical depth) 7 -5/8 "X 4 -1/2" TIW HBBP -T PKR 12937 8813 R Po v`► +. RI ,, . ,"._$ r 12. Stimulation or cement squeeze summary: Intervals treated (measured): x'�N :4 I ;P Treatment descriptions including volumes used and final pressure: Ilr^rl 01 & Cis. Com fti':, ession 13. Representative Daily Average Production or Injection 't 4arlt`" bile Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 104 1198 404 163 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory 0 Development (0 Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGO GINJ ❑ SUSPD SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Nam= Joe :stufk. ( Title Data Manager Signatur: alai i Phone 564 -4091 Date 1/31/2011 111/ V Form 10-404 Revised 10/2010 RSDAAS FF$ Q Z Ut I " ..?3, Submit Original Only ✓2/f 4 A-42A 206 -130 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base A-42A 3/24/07 PER 13,688. 13,828. 9,055.92 9,037.7 A-42A 3/24/07 PER 13,848. 13,908. 9,034.94 9,027.82 A-42A 3/24/07 PER 14,028. 14,068. 9,017.08 9,013.85 A-42A 6/7/08 BPS 12,927. 12,930. 8,808.19 8,809.73 A-42A 10/17/08 BPP 12,927. 12,930. 8,808.19 8,809.73 A-42A 1/7/11 APF 14,018. 14,043. 9,017.79 9,015.96 A-42A 1/7/11 APF 13,650. 13,675. 9,061.9 9,057.82 A-42A 1/7/11 APF 13,883. 13,908. 9,030.66 9,027.82 A-42A 1/8/11 APF 13,845. 13,870. 9,035.34 9,032.19 A-42A 1/27/11 APF 13,375. 13,400. 9,045.09 9,053.65 A-42A 1/28/11 APF 13,315. 13,340. 9,013.87 9,028.45 AB ABANDONED PER PERF • APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 1111 • • A -42A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1/27/2011i CTU #9 Job scope = BOP test, Add Perf= 1 Perforate (gun #5): 13375'- 13400', 2" PJ Omega, 6 spf. RDMO. l ** *Job continued on 1/28/2011 1/28/2011 TC U #9, Job Scope = Add Perf Perforate (gun #6): 13315'- 13340', 2" PJ Omega, 6 spf. RDMO. Job Complete FLUIDS PUMPED BBLS 57 60/40 METH 57 TOTAL TREE = 4" CIW FLS WELLHEAD= FMC • SAFETY NOTES: LBORE >70° @ 13400' * ** *WARNING: IN WEATHER KB. ELEV = BAKER A �4, 2 A MONITORING HACK BEFORE ANY ELL ORK INVOLVING KB. ELV = 85.5' _BF. ELEV = 54.67' EXPLOSIVES BEGINS. CONTACT PAD OPER. KOP = 3200' Max Angle = 100 °@ 13662' I 2197' I - 14 - 1/2" HES HXO SSSV, ID = 3.813" I 1 Datum MD = 13077' DatumTVDss= 8800' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE J 110 -3/4" CSG, 45.5 #, NT -80 BTC, ID = 9.950" I I 3124' 4 3007 2998 8 KBMG DOME BK 16 12/30/07 IIP 3 6350 5372 59 KBMG DOME BK 16 08/07/07 2 10185 7366 59 KBMG DOME BK 16 10/17/08 1 12818 8752 59 KBMG SO BK 22 10/17/08 Minimum ID = 2.786" @ 13010' 3-1/2" X 3- 3/16" XO (PIN ID) I 12927' H4 -1/2" HES X NIP, ID = 3.813" I ��� ��� I 12937' H7-5/8" X 4-1/2" TNV HBBP -T PKR, ID = 3.917" 1 TOP OF CEMENT (03/24/07 TAGGED) H 12937' - 12939' — 43.70" BOT DEPLOY SLV, ID = 3.00" 1 (TOP OF 3- 3/16" LNR I 12937' • 0. • 0 ( 12945' H3.70" X 3 -1/2" XO, ID = 2.992" 1 I 12961' H4-1/2" HES X NIP, ID = 3.813" 1 BEHIND 12972' 1 — 4 -1/2" HES XN NIP, ID = 3.80" PIPE 4 I MILLED OUT (12 /17/06) ( 12980' H 3 -1 /2" HOWCO X NIP, ID = 2.813" 4, --I 4 -1/2" TBG, 12.6 #, L-80 NSCT, � 12984' 12984' —14-1/2" WLEG, ID, 3.958" I .0152 bpf, ID = 3.958" ■ • • • • •j•••• , • • • • • ∎ � 12967 I-1 ELMD TT LOGGED 03/25/95 1 i • i • • • • � •••• ••••• • 4 3 -1/2" LNR, 9.3 #, L -80 STL, 13010' •- - •4 •!•�•� WO . 13010' —13-1/2" X 3-3/16" XO, ID = 2.786" 1 .0087 bpf, ID = 2.992" ••••••! % ••••∎ • ■♦•• •� •..... ∎ 13080' 1 — 7 -5/8" X 4 -1/2" TIW SS HIGH ANGLE • . �4 HGR/PKR ID = 4,00" i. • • 4 •• • •. 17 -5/8" CSG, 29.7 #, L -80 NSCC, ID = 6.875" I 13195' i• •i • • • •j 3.80" MILLOUT WINDOW (A -42A) 13208' - 13215' • •• 14 -1/2 WHIPSTOCK (03/17/07) 1 13208' . � � • i ` ••••• PERFORATION SUMMARY ••••• 14107' — 3- 3/16" X 2 -718" � ••••� 41414% X0, ID = 2.387" REF LOG: MGR/CCL ON 03/23/07 • • • Ili ANGLE AT TOP PERF: 98° @ 13688' ��- Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE I PPut) 1 14070' 44•••• •• •2" 6 13688 - 13828 0 03/24/07 •■•••••• • 2" 6 13 - 13908 0 03/24/07 13- 3/16" LNR, 6.2 #, L- 80'-TCII, .0076 bpf, ID = 2.80" H 14107' or 2" 6 14028 - 14068 0 03/24/07 12-7/8" LNR 6.4 #, L -80 STL, .0058 bpf, ID = 2.441" I — I 14110' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 2/4/1995 ORIGINAL COMPLETION 06/25/08 RDB /PJC SWAGETBG (02/25/08) I WELL: A -42A 03/26/07 NORDIC 1 CTD "A -42A" 06/25/08 JCM/PJC SET PX TTP @ 12910' (06/07/08) PERMIT No: 2061300 04/13/07 CJN/PAG GLV C/O 06/25/08 KSB /PJC GLV C/0 (06/08/08) API No: 50- 029 - 22542 -01 06/24/07 GS /PJC DRLG DRAFT CORRECTIONS 11/10/08 DAV /SV GLV C/O (10/17/08) SEC 35, T11N, R13E, 2263' FSL & 1703' FEL 08/16/07 JLJ /PJC GLV C/O 10/19/10 LRD/ PJC PULL PX (10/17/08) 01/16/08 DAV /PJC GLV C/0 (1230/07) BP Exploration (Alaska) 01/20/11 Schltunhappr NO. 5876 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503.2838 Attn: Christine Shartzer ATTH: Seth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 14-43 BGZ7 -00010 CROSSFLOW CHECK 4 9 - �p r 11/13/10 1 a (./ $5 1 NGI.14 AVIH -00052 USIT t LT- If 9 12/23/10 aO(.1bcf 1 1 L -205 BLPO -00073 MEM LDL a — US 12/21/10 1 p ?r3 I A-42A 8L65.00012 MEM PRODUCTION PROFILE . L3Co •••• 1 $ l0 01/08111 1 err 1 01 -30 BCZ2 -00031 INJECTION PROFILE ) _ / Pn { 12/03/10 1 !'J 1 1 02 -20 BBSK -00040 RST r ( 11/19/10 1 n9 1 1 07 -238 AYIM00056 RST J 11/28/10 � � 1 04.24 AY 00058 RST ) O 12/05/10 1 �� / e 1 11 -12 BCZ2 -00033 RST 12107/10 1 1 • 2- 288/0 -19 BCRJ -00055 RST 6 --( 12/01/10 _ 1 ,}0 1 � S -128 BCZ2 -00035 USIT 1S Ci 01/02/11 ' L)(n 1 1 W -220 BG4H -00025 USIT O •-• 1 C 12/27/10 6 1 1 S-41A , 10AKA0108 OH MWD WD EDIT TTel —1 L) ( 10115/10 2 R)tnC# 1 1 S41AL1 10AKA0108 OH MWD /LWD EDIT 3111 -.409. 10/15/10 2 Q0r @!p 1 H -11 BGZ7 -00014 RST J lin _ orn it 12118110 1 `a-D 1 - /'' cD PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data 8 Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 'IV ED MAR 1 4 ZOii • 1 0 , , ( 5 --- , r' xl) t,0 ( ' ', y l , a., 1,' o r9 STATE OF ALASKA ALASKA. AND GAS CONSERVATION COMMISSII REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate IS Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development El Exploratory ❑ * 206 -1300 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 22542 -01 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: r ADLO- 047472 PBU A-42A 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 14110 feet Plugs (measured) None feet true vertical 9010 feet Junk (measured) None feet Effective Depth measured 14070 feet Packer (measured) 12937' feet true vertical 9013.66 feet (true vertical) 8813' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" 91.5# H -40 SURFACE - 110' SURFACE - 110' 1490 470 Surface 3124 10 -3/4" 45.5# NT -80 35' - 3124' 35' - 3114' 5210 2480 Intermediate 13195 7 -5/8" 29.7# L -80 32' - 13195' 32' - 8946' 6890 4790 Production 128 4 -1/2" 12.6# L -80 13080' - 13208' 8887' - 8951' 8430 7500 Liner 1171 3- 1/2 "X3- 3/16 "X2 -7/8" 12939' - 14110' 8814' - 9010' Liner 9.3#16.2 # /6.4# Perforation depth: Measured depth: SEE ATTACHED - _ True Vertical depth: _ - r .,.., ..__.. ._.... _. ._ _ - - Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 12.6# SURFACE - 12984' SURFACE - 8837' Packers and SSSV (type, measured and true vertical depth) �� 7 { - 5/8 "X4 -1/2" TIW HBBP -T PKR 12937' 8813' "srt" t I 1 2, 201i REcrzAr::,n 12. Stimulation or cement squeeze summary: : i‘ ' 1 2011 Intervals treated (measured): Treatment descriptions including volumes used and final pressure: ` 1.Co«$' (o r!; ". @(SSI011 anCOOfilge 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 104 1198 404 163 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development al i Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil * 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Pre, _ Title Data Management Engineer Signature t Phone 564 -4944 Date 1/10/2011 RBDAA JS A 12 2011 . - '- a •!r Form 10 -404 Revised 10/2010 Submit Original Only - fi • • A -42A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1/6/2011 `CTU #9 w 1.75" ct Job scope : Drift tubing PPROF & Add perforations. Drift with .2.25" JSN Tagged PBTD @ 14074' .POOH. RIH w/ PPROF with DEFT to flag at i 14030 MD. Perform log as per program. Paint second flag at 13,600 MD. POOH. sAt surface got good DATA from logging tools. RIH w / 2 "x 25' of 6 spf - 60 deg - PJ02006 HMX guns. «< Job in progress »> 1/7/2011 ICTU #9 w 1.75" ct Job scope : Drift tubing PPROF & Add perforations. «< Continue WSR from 1/6/11 »> RIH w / runs #1 .2,and 3 of 2 "x 25' of 6 spf - 60. deg - PJ02006 HMX guns ( #1) Top shot 14018 bottom shot 14043' ( #2) Top shot 13650' bottom shot 13675' ( #3) Top shot 13883 bottom shot 13908' At surface confimed holes. All balls recovered. RIH w / SLB GR / CCL logging tools. «< Job in progress »> 1/8/2011 CTU #9 w 1.75" ct Job scope Drift tubing PPROF & Add perforations. «< Continue WSR from 1/7/11 »> At surface confirmed good DATA. RIH w / 2 "- 6 - 1 spf - 60 deg - PJ02006 HMX guns. Top shot at 13845' bottom shot 13870'. I POOH. At surface confirm guns fired, ball recovered. E � [ FLUIDS PUMPED BBLS 225 60/40 225 TOTAL A-42A 206 -130 PERF ATTACHMENT Meas Tvd Tvd Sw Operatio Depth Depth Depth Name Perf Operation Code n Date Top Meas Depth Base Top Base A-42A PER 3/24/07 13,688. 13,828. 9,055.92 9,037.7 A-42A PER 3/24/07 13,848. 13,908. 9,034.94 9,027.82 A-42A PER 3/24/07 14,028. 14,068. 9,017.08 9,013.85 A-42A BPS 6/7/08 12,927. 12,930. 8,808.19 8,809.73 A-42A BPP 10/17/08 12,927. 12,930. 8,808.19 8,809.73 • A-42A APF A-42A APF 1/7/11 13,650. 13,675. 9,061.9 9,057.82 1/7/11 13,883. 13,908. 9,030.66 9,027.82 A-42A APF 1/7/11 14,018. 14,043. • 9,017.79 9,015.96 A-42A APF 1/8/11 13,845. 13,870. 9,035.34 9,032.19 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • III TREE = 4" CIW FLS WELLHEAD= FMC • SAFETY NOTES : LBORE >70° @ 13400' * ** *WARNING: ACTUATOR= , BAKER A -42A MUST TURN OFF KB. ELEV = 85.5' MONITORING SHACK BEFORE ANY W ELLWORK INVOLVING BF. ELEV = _.. _ 54.67 EXPLOSIVES BEGINS. CONTACT PAD OPER. - KOP = 3200' Max Angle = 100 °@ 13662' I 2197' I - 14 - 1/2" HES HXO SSSV, ID = 3.813" Datum MD = 13077' Datum TVDss 8800' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 110-3/4" CSG, 45.5 #, NT -80 BTC, ID = 9,950" I - 1 3124' 1 4 3007 2998 8 KBMG DOME BK 16 12/30/07 Min 3 6350 5372 59 KBMG DOME BK 16 08/07/07 2 10185 7366 59 KBMG DOME BK 16 10/17/08 1 12818 8752 59 KBMG SO BK 22 10/17/08 Minimum ID = 2.786" @ 13010' 3-1/2" X 3 -3/16" XO (PIN ID) I 12927' I—I4- 112" HES X NIP, ID = 3.813" I 1,;.,-4 07 .. ; , / 12937' — I7 -5/8" X 4 -1/2" TIW HBBP -T PKR, ID = 3.917" I ITOPOF CEMENT (03/24/07 TAGGED) H 12937' s• 12939' —13.70" BOT DEPLOY SLV, ID = 3.00" 1 'TOP OF 3- 3/16" LNR I 12937' e 12945' I — I 3.70" X 3-1/2" XO, ID = 2.992" I • • ■I 12961' H4 -1/2" HES X NIP, 0= 3.813" I BEHIND ', I 12972' I 4 -1/2" HES XN NIP, ID = 3.80" PIPE MILLED OUT (12/17/06) A, A 1 12980' 1 HOWCO X NIP, ID = 2.813" I 44 • 4 -1/2" TBG, 12.6 #, L -80 NSCT, — 12984' • 12984' J WLEG, ID, 3.958" I .0152 bpf, ID= 3.958" j • • ' • , •• •' • • I 1 2967 H ELMD TT LOGGED 03/25/95 I • • 4 • •• 12967 • •••• • 3 -1/2" LNR, 9.3 #, L -80 STL, 13010' ••• • • • - • 4 c*�•� * — 13010' 1-13-1/2" X 3 - 3/16" XO, ID = 2.786" I i•• .0087 bpf, ID = • 2.992" 4••••• • •♦•• ■ •••1 •. ∎.% • 13080' — 7 -5/8" X 4 -1/2" TIW SS HIGH ANGLE .i, • . HGR/PKR, ID = 4.00" • • • • •, • • • 4 7 -5/8" CSG, 29.7 #, L -80 NSCC, ID = 6.875" I 13195' p• • • '• • , • •� // 3.80" MILLOUT WINDOW (A -42A) 13208' 13215' •∎ • I4 -1/2 WHIPSTOCK (03/17/07) I 13208' 4 .1r • ` ••••, ••••• 411111111111111* •••• PERFORATION SUMMARY • •••••• 14107' 3 3/16" X 2 -718" REF LOG: MGR/CCL ON 03/23/07 - •••*••r' XO, ID = 2.387" IIII ANGLE AT TOP PERF: 98° @ 13688' or Note: Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE I PBTD 1 14070' .• . .•.•••••• • *•.• 2" 6 13688 - 13828 0 03/24/07 • ••!• * *!,. 2" 6 13848 - 13908 0 03/24/07 3- 3/16" LNR, 6.2 #, L- 80`TCII, .0076 bpf, ID = 2.80" H 14107' 441 2" 6 14028 - 14068 0 03/24/07 I2 -7/8" LNR, 6.4 #, L -80 STL, .0058 bpf, ID = 2.441" 1-1 14110' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 2/4/1995 ORIGINAL COMPLETION 06/25/08 RDB /PJC SWAGE TBG (02/25/08) WELL: A -42A 03/26/07 NORDIC 1 CTD "A -42A" 06/25/08 JCM/PJC SET PX TTP @ 12910' (06/07/08) PERMIT No: '2061300 04/13/07 CJN/PAG GLV C/O 06/25/08 KSB /PJC GLV C/O (06/08/08) API No: 50- 029 - 22542 -01 06/24/07 GS /PJC DRLG DRAFT CORRECTIONS 11/10/08 DAV /SV GLV C/0 (10/17/08) SEC 35, T11 N, R13E, 2263' FSL & 1703' FEL 08/16/07 JLJ /PJC GLV C/0 10/19/10 LRD/ PJC PULL PX (10/17/08) 1 01/16/08 DAV /PJC GLV C/0 (1230/07) BP Exploration (Alaska) • ~. _ _ ~ ~ =~ ~~ , ~• 4 ~~ ~~ ~ ... '~ z ~~ ~~ ; . ~.v . . ,: ~ati~~~ MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THLS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~s ~*;l DATA SUBMITTAL COMPLIANCE REPORT 3/26/2009 Permit to Drill 2061300 Well Name/No. PRUDHOE BAY UNIT A-42A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22542-01-00 MD 14110 TVD 9010 Completion Date 3/25/2007 Complet ion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION -. ~~ Y Mud Log No Samples No Directional Survey Ye DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, RES (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 13195 14110 Open 5/8/2007 Rp Directional Survey 13195 14110 Open 5/8/2007 D C Las 15626 Induction/Resistivity 13103 14110 Open 10/26/2007 LAS, ATR, RPM, GR, ROP w/PDF graphics ~g Induction/Resistivity Col 1 13226 14111 Open 3/7/2008 TVD Multi Propagation Resisitivity, GR 22-Mar- 2007 og Induction/Resistivity Col 1 13226 14111 Open 3/7/2008 MD Multi Propagation Resisitivity, GR 22-Mar- 2007 g Gamma Ray 25 Col 1 13226 14111 Open 3/7/2008 MD GR 22-Mar-2007 g See Notes Col 0 0 3/7/2008 Depth Shift Monitor Plot Rpt LIS Verification 13208 14111 Open 4/1/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS D C Lis 16085 Induction/Resistivity 13208 14111 Open 4/1/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Rpt LIS Verification 13104 14111 Open 5/21/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS D C Lis 16277 Induction/Resistivity 13104 14111 Open 5/21/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS og Gamma Ray D ,,.,~, ~ ~~ ~ 25 Col 13226 14111 Open 5/21/2008 MD GR g Induction/Resistivity ~~,,r(,~,,,,~p 25 Col 13226 14111 Open 5/21/2008 MD Ind, Res, GR DATA SUBMITTAL COMPLIANCE REPORT 3/26/2009 Permit to Drill 2061300 Well Name/No. PRUDHOE BAY UNIT A-42A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22542-01-00 MD 14110 TVD 9010 Completion Date 3/25/2007 Completion Status 1-OIL Current Status 1-OIL UIC N o/g Induction/Resistivity D",-~4` 25 Col 13226 14111 Open 5/21/2008 TVD Ind, Res, GR ~.,rog See Notes ~ -~.y~ ~~ ~ 2 Col 13606 14090 Open 5/21/2008 Depth Shift Monitor Plots Well CoreslSamples Information: Name ADDITIONAL INFORMATION Well Cored? Y V Chips Received? ~ ~ .~-° Analysis .aG~l-N~ Received? Comments: Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~/ N Formation Tops ~ N Compliance Reviewed By: _. _ __ __ __ _ - - - Date: `,~ [ ~J~`( D • ~ '$~ BAKER M~J6~iE5 Faker Atlas PRINT DISTRIBUTION LIST CUMYANY BY EXYLUKA'1'lUN (ALASKA) INC CUUN'1'Y NUR'1'H SLUYE BURUUGH WELL NAME A-42A STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 5/20/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1382322 Copia of Copia Digital Copics of Copis Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE, AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 I Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 1 Company DNR -DIVISION OF OIL & GAS Company Person KRISTIN DIRKS Person Address 550 WEST 7TH AVE Address SUITE 802 ANCHORAGE. AK 99501 Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 1701 ~ Aldine Westfield, Houston, Texas 77073 ~_ This Distribution List Completed Bv: a~-<3~ Page 1 of 1 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: A-42A Contains the following: 1 LDWG Compact Disc (Includes Graphic Image f les) 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MPR/Directional TVD Log (to follow) 1 color prints - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1382322 Sent by: Catrina Guidry Date: 05/20/08 ~. Received by: Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~/.s. 6~5 1lYTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~ -~3c~ `(o ~~ INTEQ L®g & Data Transmittal F®rm To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: A-42A Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MP12/Directional TVD Log (to follow) 1 color prints - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1382322 Sent by: Catrina Guidry Date: 03/04/08 -~ Received by: Date: ~ ~' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ ~~'" /3v ~ ~~ b~v ~~ 7260 Homer Drive BAS Anchorage, Alaska 99518 Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 • ~/~~ BAKER F~VGMES Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY 1:;XYLURA'ilON (ALASKA)1NC CUUN 1'Y NURTH SLUPE BURUUCiH WELL NAME A-42A STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 3/4/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1382322 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUIT 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List ComQleted By: ~v~ 'v- Page l of 1 i 5:~ Date 10-12-2007 Transmittal Number:92914 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have anv questions, please contact Douglas Dortch at the PDC at 564-4973 ~a slivery Contents CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: >_-126 aa~--~s`~__'~_:!S_6_/~_.._._ ~-16CP61_a0 ~-0P13_-- ~_l u ~of`9 _ ._ _ D4-01 A ~b~-- p~.___~ LS~C~---------- 15-16B _ t~=C~33 _-t~~l_~~. 15-16BP61 _ ~~~~-3 1~_~ ____ 15-166P6~ a~-~~~3-_tsG,a~ 18-27D~D~- L33 ~ ~1Q2_`L__~_.. __._ . 18-27DP61 - _ao~_l3~__~_5~2~.____...-- -..-. 4A c?6G ~'~2__ l~~ac2~_`__ 4APB1 avlo-ova __ l,~o'?~..____.__~~..__.. 11 APB1 _2ULo--c~.c~- _lo .....l.S~z3 4_ .____.___ _._.~ 37APB1 _,:~-b 5 ~_ DS ~.._.~., x'(033-_.~.-._... -102 -102 ,_~ Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~;~ ~. . ,~ ~, y Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 STATE OF ALA~~>KA~''E'vE g ALASKA~L AND GAS CONSERUp~CgV ~ SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & Gas Cons. COn~j§~~}: Revised, Corrected BHL 8 ND's 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 3/25/2007 12. Permit to Drill Number 206-130 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 3/19/2007 13. API Number 50-029-22542-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 3/21/2007 14. Well Name and Number: PBU A-42A 2263 FSL, 1703 FEL, SEC. 35, T11 N, R13E, UM Top of Productive Horizon: 567' FNL, 1729' FEL, SEC. 11, T10N, R13E, UM 8. KB (ft above MSL): 85.5' Ground (ft MSL): 50.4' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 166' FNL, 1231' FEL, SEC. 11, T10N, R13E, UM 9. Plug Back Depth (MD+TVD) 14070 9014 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 653705 y- 5947415 Zone- ASP4 10. Total Depth (MD+TVD) 14110 9010 16. Property Designation: ADL 047472 TPI: x- 653852 y- 5939307 Zone- ASP4 Total Depth: x- 654341 y- 5939718 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Su mit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD DIR, GR, RES 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD- f{OLE AMOUNT Wr. PER-FT. GRADE TOP BOTTOM ' TDP' BOTTOM SI'GE CEMENTING RECORD PULLED 20" 91.5# H-40 Surfa a 110' Surface 110' 30" 2 0 x Arctic Se A rox. 10-3/4" 45.5# NT-80 35' 3124' 35' 3114' 13-1l2" 970 sx Coldset III 375 sx Class'G' 7-5/8" 29.7# L-80 32' 13195' 32' 8946' 9-7/8" 265 sx Class'G' 4-1/2" 12.6# L-80 1308 ' 1 8887' 8951' 6-3/4" P&A ement w/ 102 Bbls Class'G' 3-1/2" x 3-3/16" 9.3# / 6.2# L-80 12939' 14110' 8814' 9010' 4-1/8" 83 sx Class 'G' 23. Open to production or inject ion? ®Yes ^ No 24:. TuewG RecoRD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH .SET MD PACKER SET MD 2" Gun Diameter 6 spf 4-1/2", 12.6#, L-80 12983' 12937' , MD TVD MD TVD 13688' - 13828' 9056' - 9038' 13848' - 13908' 9035' - 9028' 'Zrj; ACID, FRACTURE, CEMENT SQUEEZE, ETC. 14028' - 14068' 9017' - 9014' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 2500' Freeze Protected with 60/40 McOH 26. PRODUCTION TEST Date First Production: May 11, 2007 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date Of Test: 6/3/2007 HOUrS Tested: 6 PRODUCTION FOR TEST PERIOD OIL-BBL: 57 GAS-MCF: 150 WATER-BBL: 207 CHOKE SIZE: 176 GAS-OIL RATIO: 2,618 Flow Tubing Press. 200 CaSing PreSS: 1,100 CALCULATED 24-HOUR RATE• OIL-BBL: 228 GAS-MCF: 598 WATER-BBL: 828 OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results er 20 AAC 250.071. COIt4PLE7tOt1 None ~~ U _p ~~~.- !~ C ` Il ~ 2007 Form 10-407 Revised 02/2007 ~ u ~ ~ `' ~~TI~UED ON REVERSE SIDE Q~ / /e/ Q~ /~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD WeIlTested. ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Shublik B 13231' 8962' None Shublik C 13260' 8978' Sadlerochit 13315' 9014' Formation at Total Depth (Name): Sadlerochit 13315' 9014' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. 8 ' a7 l~ Signed Terrie Hubble Title Technical Assistant Date PBU A-42A 206-130 Prepared By NameMumber: Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Garret Staudinger, 564-4242 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only by Terrie Hubble Technical Assistant Drilling & Wells ~~~ s~~ ~~i :~~ BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 ~~c~ivEQ August 30, 2007 Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Reference: API # 50-029-22542-01-00 Direct: (907) 564-4628 Terrie.hubble~bp.com Permit # 206-130, PBU A-42A To Whom It May Concern: AUG 3 12007 Aiaslca Oii & Gas Cons. Commission Anchorage It has been brought to my attention that the Bottom-Hole-Location, X,Y's and some TVD's are incorrect on the previously submitted Completion Report (Dated 06/06/07) for this well. At this time I am submitting a corrected version. I have verified all other depths and feel that it is now correct. i have also attached a copy which I have marked up with the areas that required correction to assist you. Sincerely, Terrie Hubble xc: Well Files PDC REGE~V~ .~ - STATE OF ALASKA ~~ G ~1UNAQA~6h~~IL AND GAS CONSERVATION COMM~ ION L OM OR RECOMPLETION REPORT AND LOG /~l~ Alaska Oi~~as Farts. ~~~~,~ enr_hnranp 06106107: Revised, Put on Production 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other N of Completions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Dat Comp Susp., or Aband. 3/25/2007 - 12. Permit to Drill Number 206-130 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 3/19/2007 ~ 13. API Number 50-029-22542-01-00~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 3/21/2007 14. Well Name and Number: PBU A-42A 2263 FSL, 1703 FEL, SEC. 35, T11 N, R13E, UM Top of Productive Horizon: ~~ 567' FNL, 1729' FEL, SEC. 11, T10N, R13E, UM ~~' 8. KB (ft above MSL): 85.5' ~ Ground (ft MSL): 50.4' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Tota epth: '`~'~'~ res~~~ ~1 ~~~ ~13i 41 NL, 1 EL, SEC. 11, T10N, R13E, UM 9. Plug Back Depth (MD+TVD) 14070 ~ 9076 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 653705 y- 5947415 Zone- ASP4 10. Total Depth (MD+TVD) 14110 9081 ~ 16. Property Designation: ADL 047472 TPI: x- 653852 y_ 5939307 Zone- ASP4 Total Depth: x- 653997 y- 5938519 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit el ctronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD DIR, GR, RES 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH`TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 urfa a 110' Surfa 11 30" 260 sx Arctic Set A rox. 10-3/4" 45.5# NT-80 35' 3124' 35' 311.4' 13-1/2" 970 sx Coldset III 375 sx Class 'G' 7-5/8" 29.7# L-80 32' 13195' 32' 8946' 9-7/8" 265 sx Class 'G' 4-1 /2" 12. L-80 13080' 1 2 8887' 8951' 6-3/4" P A ement w/ 102 Bbls CI s ' 3-1/2" x 3-3/16" 9.3# / 6.2# L-80 12939' 14110' 8814' 9081' 4-1 /8" 83 sx Class 'G' 23. Open to production or inject ion? ®Yes ^ No 24' TueING RECORD If Yes, list each interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER .SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 12983' 12937' MD TVD MD TVD 13688' - 13828' 9049' - 9 13848' - 13908' 9049' 056' 25, ACID, FRACTURE, CEMENT SQUEEZE, ETC. ~ ~V~ 14028' - 14068' 9 ' - 9076' ~~~~~ 'C-'~t~C'~rC~ DEPTH INTERVAL MD AMOUNT & KIND OP MATERIAL USED ' '~,~~`' ~"(; ,~ p, 2500' Freeze Protected with 60/40 McOH ~ 26. PRODUCTION TEST Date First Production: May 11, 2007 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date Of Test: 6/3/2007 HOUrS Tested: 6 PRODUCTION FOR TEST PERIOD OIL-BBL: 57 GAS-MCF: 150 WATER-BBL: 207 CHOKE SIZE: 176 GAS-OIL RATIO: 2,618 Flow Tubing Press. 200 Casing Press: 1,100 CALCULATED 24-HOUR RATE..' OIL-BBL: 228 GAS-MCF: 598 WATER-BBL: 828 OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None ~: JAN Q ~ 2DU7 Form 10-407 Revised 02/2007 ONTINUED ON REVERSE SIDE l ~ 1 V r ~8. GEOLOGIC MARKERS (LIST ALL FORMATIONS ANO ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Shublik B 13231' 8962' None Shublik C 13260' 8978' Sadlerochit 13315' 9014' Formation at Total Depth (Name): Sadlerochit 13315' 9014' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. (~ / ~ Signed Terrie Hubble ~ Title Technical Assistant Date ` / ~0~~ PBU A-42A 206-130 Prepared By NameMumber. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Garret Staudinger, 564-4242 Permit No. / A royal No. INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ,~®~. ~^~ STATE OF ALASKA ALASKA OIL /~~ID GAS CONSERVATION COMMISSION WELL COMPLETIbN OR RECOMPLETION REPORT AND LOG R~cE~v~® APR 2 3 Z00? Alaska qil & Gas Cons. Gotnmission 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One O 1 b. Well Class: AnC Drags ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Dat Comp , Susp., or A~~' . 3/25/2007 12. Permit to Drill Number 206-130 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 3/19/2007 ~ 13. API Number 50-029-22542-01-00 ' 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 3/21/2007 l 14. Well Name and Number: PBU A-42A 2263 FSL, 1703 FEL, SEC. 35, T11N, R13E, UM Top of Productive Horizon: 567' FNL, 1729' FEL, SEC. 11, T10N, R13E, UM i 8. KB Elevation (ft): 85.5' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1361' FNL, 1601' FEL, SEC. 11, T10N, R13E, UM - 9. Plug Back Depth (MD+TVD) 14070 + 9076 Ft Pool - 4b. Location of Well (State Base Plane Coordinates): Surface: x- 653705 y- 5947415 Zone- ASP4 10. Total Depth (MD+TVD) 14110 + 9081 Ft 16. Property Designation: ADL 047472 TPI: x- 653852 y- 5939307 Zone- ASP4 Total Depth: x- 653997 y- 5938519 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: ~~ ~~/ ON / ,e?O 5- • MWD DIR, GR, RES .3 =/ -O.~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTHTVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE - CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 110' Surface 110' 30" 260 sx Arctic Set A rox. 10-3/4" 45.5# NT-80 35' 3124' 35' 3114' 13-1 /2" 970 sx Coldset III 375 sx Class 'G' 7-5/8" 29.7# L-80 32' 1 1 5' 32' 946' 9-7/8" 2 sx CI ss 'G' 4-1/2" 12.6# L-80 13080' 1 2 8887' 8951' 6-3/4" P&A Cement w/ 102 Bbls Class'G' 3-1/2" x 3-3116" 9.3# / 6.2# L-80 12939' 14110' 8814' 9081' 4-1 /8" 83 sx Class 'G' 23. Perforations open to Production (MD + ND of Top and 24. '' TUBWG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 12983' 12937' MD TVD MD TVD 13688' - 13828' 9049' - 9048' 13848' - 13908' 9049' - 9056' 25: ACID, FRACTURE,. CEMENT SQUEEZE, ETC. 14028' - 14068' 9071' - 9076' DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED 2500' Freeze Protected with 60/40 McOH 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Press. Casing Pressure CALCULATeD 24-H~ RaTE.• OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet,, if necessary). Submit core chips; if none, state "none". None `~~`~~~ f e wsr•®aar rs m.+ ~•~ne S~ ~, tuut Form 10-407 Revised 12/2003 0 R 1 G I N AQONTINUED ON REVERSE SIDE V 28. GEOLOGIC MARKS 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NnMe MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Shublik B 13231' 8962' None Shublik C 13260' 8978' Sadlerochit 13315' 9014' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. l~ ~ e Signed Terrie Hubbl Title Technical Assistant Date V 1 ~~~ PBU A~t2A 206-130 Prepared By NameMumber. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Garret Staudinger, 564-4242 Permit No. / A royal No. INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly .Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION Page 1 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date j From - To Hours Task Code NPT Phase Description of Operations g ease p move rig off well. Warm moving system. Held PJSM for moving rig off well & pre-move safety meeting with crew, security & tool services. Jack-up rig & pull rig off well. Move rig from G-pad to A-pad. Meanwhile SLB service injector & Nordic service test pump manifold. Arrive @ A-pad. Standby for SLB Slickline unit to R/D from nearby well & for Veco to finish bleeding down the OAP on A-42. Move & position rig in front of A-42. PJSM. Review procedure, hazards & mitigation for backing rig over well. Back rig over well & set down. Observe pad not level underneath the motor room. W.O. Tool Services to deliver wood to place underneath the motor room. Jack up rig and position wood below rig to support it. Lower and level rig. Spot clean cuttings tank. VECO cleaned cement out of tank in their shop during rig move. R/U work platform on well tree. ACCEPT RIG AT 2100 HRS, 03/15/2007. 3/15/2007 06:00 - 09:00 3.00 RIGD P PRE Ri rel d from G-08A Q 06:OOHrs on 3/15/2007. Pre to 3/16/2007 100:00 - 06:30 I 6.50 I BOPSUR P I I PRE 09:00 - 09:30 0.50 MOB P PRE 09:30 - 10:00 0.50 MOB P PRE 10:00 - 15:00 5.00 MOB P PRE 15:00 - 16:00 1.00 MOB N WAIT PRE 16:00 - 16:45 0.75 MOB P PRE 16:45 - 17:00 0.25 MOB P PRE 17:00 - 17:30 .0.50 MOB P PRE 17:30 - 21:00 3.50 RIGU N WAIT PRE 21:00 - 00:00 3.00 BOPSU P PRE 06:30 - 08:30 I 2.001 RIGU I P I I PRE 08:30 - 11:15 I 2.751 RIGU N WAIT PRE 11:15 - 11:30 0.25 RIGU P PRE 11:30 - 11:45 0.25 RIGU P PRE 11:45 - 13:15 1.50 RIGU P PRE 13:15 - 13:30 0.25 RIGU P PRE 13:30 - 16:00 2.50 RIGU P PRE 16:00 - 16:15 0.25 RIGU P PRE 16:15 - 18:00 1.75 RIGU P PRE 18:00 - 19:30 ~ 1.501 RIGU P PRE N/U BOPE. Pump open SSV and lock open with fusible cap. Position trailers and welding shack. Pressure test BOPE. Witness waived by Jeff Jones of AOGCC. Send test report to AOGCC. Prep to B/D CT reel with N2. P/U injector & stab on well. R/U SLB N2 unit. R/D jucnction box & hardline inside reel. Meanwhile move Nordic-1 camp from G-pad to A-pad. W.O. DSM to R/U tiger tank. Could not R/U tiger tank earlier due to slickline unit on nearby well. DSM R/U tiger tank & hardline. PlTest hardline to 500psi low, 4000psi high - OK. Meanwhile SLB inspect all their lifting slings on the rig. PJSM for B/D CT with N2. P/T N2 lines - OK. Blow down CT with N2 & bleed down. PJSM for stripping off & pulling back CT to the reel. P/U injector & cut off CTC. Prep end of CT for internal grapple. Slip grapple connector into CT, M/U & pull test. Strip-off CT from injector & spool back CT stub to reel. Secure CT with crossbar and chains & prep reel for shipment. Release reef drive bushings. P/U CT reel with bridge crane. PJSM with Veco crew on CT reel swap. Open up Bombay doors & lower CT reel onto Veco trailer. P/U replacement eline CT reel into reel house with bridge crane & align drive pins & bushing. M/U hardline inside new reel. The stub of coil inside the reel was not pointed towards the center enough, so there was not enough clearance for the hardline and valves and pressure bulkhead. Printed: 3/26/2007 10:37:30 AM BP EXPLORATION Page 2 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 3/16/2007 19:30 - 20:20 0.83 RIGU N RREP PRE Lost power, restart generator, failed again. Restart 4 times. Running OK. 20:20 - 00:00 3.67 RIGU P PRE Install E-Line pressure bulkhead, strip armor off of E-line. Bend end of coil to M/U hardline. 3/17/2007 00:00 - 02:30 2.50 RIGU P PRE Bend coil to make room for hardline, valves and pressure bulkhead inside reel. Install hardline and secure it inside reel. 02:30 - 04:30 2.00 RIGU P PRE Unstrap new coil, install internal grapple and pull test. Pull stub of E-Coil to injecter head. Stab coil into injecter head. Remove grapple. 04:30 - 06:00 1.50 WHIP P WEXIT Cut off 10' of coil. M/U SWS CTC. Pull test CTC - OK. M/U BHI Quick connect. Meg E-line - OK. 06:00 - 08:15 2.25 WHIP P WEXIT Flush CT with 5bbls of McOH ahead & 10bbls of KCL water. P/T hardline to reel & inner reel valve to 350psi low & 3500psi high. Circ & fill CT with 2% KCL water. PlTest CTC to 3500psi OK. 08:15 - 08:30 0.25 WHIP P WEXIT Held PJSM with DSM & crew for retrieving the BPV. 08:30 - 09:00 0.50 WHIP P WEXIT Offload WS tools & equipment, DSM lubricator & P/U to rig floor. M/U DSM lubricator to well. 09:00 - 10:00 1.00 WHIP P WEXIT Retrieve BPV from tbg hanger. Check WHP - Opsi. 10:00 - 10:30 0.50 WHIP P WEXIT R/D & UO DSM lubricator & tools. 10:30 - 11:00 0.50 WHIP P WEXIT Hold pre-operations safety meeting. Review well plan, potential hazards & whipstock setting BHA M/U procedures. 11:00 - 11:30 0.50 WHIP P WEXIT Circ & fill hole with 30bbls of 2% KCL fluid. 11:30 - 12:30 1.00 WHIP P WEXIT M/U WS setting BHA #1 with BKR 4-1/2" monobore whipstock, setting adapter, #10J hyd setting tool, BHI Coiltrack BHA. Scribe WS tray to MWD. BHA OAL =77.35'. M/U BHI depth encoder to injector. 12:30 - 15:30 3.00 WHIP P WEXIT RIH WS setting BHA #1 circ ~ min rate thru BHI 100%open EDC. Getting 23% dynamic losses. Wt check @ 13150' _> Up 43.3k, Down - 17k. 15:30 - 16:30 1.00 WHIP P WEXIT Log down GR from 13150' to 13275' (across the Shublik-Ivishak contact) ~ 150fph & tie-into Geology PDC log. Subtract 0.5' from BHI depth & 18' from SLB depth. PUH to 13150'. 16:30 - 16:45 0.25 WHIP P WEXIT Log down CCL from 13150' to 13275' C~ 900fph. Pick 4-1/2" Inr collars ~ +/-13105', 13145', 13185 & some noise ~ 13205' (probably a cementralizer?). 16:45 - 17:15 0.50 WHIP P WEXIT PUH to 13180'. RBIH & position BOWS ~ 13220.44' with TOWS @ 13208'. Orient TF to 180degs - LS. Close EDC. Circ ~ 0.3bpm for 2mins to set the whipstock. Pressure up & shear off WS ~ 3200psi. S/D pumps & set down 5k & WS held. 17:15 - 18:45 1.50 WHIP P WEXIT PUH to 13110'. Open EDC. Pump down 45bbls of 150k LSRV flopro pill ~ 2.25/1.78bpm & 1750psi. Shut in well & squeeze in 20bbls f~ 0.99bpm/1300psi & 675pis WHP. Lay-in 25bbls of hi-vis flopro pill 1:1. 18:45 - 21:45 3.00 WHIP P WEXIT POOH with WS setting BHA #1. 21:45 - 22:45 1.00 WHIP P WEXIT Lay out BOT Whipstock running tools. Lay out BHI tools. 22:45 - 23:00 0.25 ZONISO P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for M/U cementing BHA. 23:00 - 00:00 1.00 ZONISO P WEXIT M/U cementing BHA #2 with cementing nozzle, 18 jts of CSH workstring, BOT pull disconnect, XO and CTC. OAL = 561.17'. E-Line was hanging free, 5' into top of CSH top Printed: 3/26/2007 10:31:30 AM BP EXPLORATION Page 3 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3h 5/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ~ Task Code I NPT Phase Description of Operations 3/17/2007 23:00 - 00:00 1.00 ZONISO P 3/18!2007 00:00 - 03:00 3.00 ZONISO P 03:00 - 03:45 ~ 0.75 ~ ZONISO ~ P 03:45 - 04:00 I 0.251 ZONISO I P 04:00 - 06:20 I 2.331 ZONISO I P 06:20 - 07:15 I 0.921 ZONISO I P 07:15 - 09:30 I 2.251 ZONISO I P WEXIT joint. WEXIT RIH with cementing BHA #2. Circ at 0.5 bpm, 100 psi. Full returns. Rig up SWS cementers. Tag whipstock at 13,233'. Correct depth to 13,210' at pinch point on Whipstock. WEXIT Close choke, Perform infectivity test, 1 bpm at 530 psi, 1.5 bpm at 1050 psi. Circ. while SWS cementers batch mix cement. WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for pumping Cement Sqz job. WEXIT Press test cement line. Stage 5 bbls water ahead. Stage 21 bbls 15.8 PPG, G Cement, 1.8 bpm, 900 psi. 0.3 bpm losses. Stage 5 bbls water behind. Isolate cementers. Clean lines. Displace cement with 2# Biozan. Coil capacity = 69 bbls. plus 0.9 bbls CSH capacity. 10 bbl behind cmt, 2.2 bpm, 1100 psi. 20 bbl behind cmt, 2.8 bpm, 2150 psi, 2.4 bpm returns. 30 bbl behind cmt, 2.8 bpm, 2500 psi, 2.4 bpm returns. Swap to KCI water at 30 bbl Biozan. 40 bbl behind cmt, 2.6 bpm, 2500 psi, 2.3 bpm returns. Close choke at 45 bbl displ, CMT at nozzle at 48 bbl displ. 1.1 bpm, 430 psi SIWHP. Sqz CMT to slotted liner at 1.1 bpm. 50 bbl behind cmt, 1.1 bpm, 450 psi whp, Pick up slow at 5 fpm. 54 bbl behind cmt, 1.0 bpm, 1200 psi whp, 56 bbl behind cmt, 1.0 bpm, 1500 psi whp, open choke and lay in cmt at 1 bpm / 29 fpm. Hold 1300 psi with choke. 6 bbls sgzd to formation. 60 bbl behind cmt, 1.0 bpm, 1330 psi, nozzle at 13080', inside 7-5/8" csg, lay in at 1.0 bpm/22 fpm 65 bbl behind cmt, 1.0 bpm, 1480 psi, nozzle at 12960', inside 4-1/2" tbg, lay in at 1 bpm, 66 fpm. 70 bbl behind cmt. Top of cement at 12,300 psi. Close choke. Pull to safety at 12280'. Sqz cement to slotted liner at 0.5 bpm at 1200 psi. Sqz 7 bbls. Stop pump, monitor whp. SIWHP dropped to 320 psi. Wait 15 min. Pump 0.5 bbl. Wait 15 min. SIWHP = 280 psi. Wait 15 min. Pump 0.5 bbl, Hold 280 psi WHP. Weak squeeze. WEXIT Open choke. Circ at 1 bpm. full returns. Circ. 2 bpm, full returns. RIH and dress off cement to 13,150'. POH. RIH again to 13,150'. No indication of cement when dressing off. WEXIT Jet OOH ~ 2.6 bpm getting back full returns. Jet thoroughly Printed: 3/26/2007 10:31:30 AM BP EXPLORATION Page 4 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 ~ Date From - To Hours Task Code~NPT Phase Description of Operations 3/18/2007 07:15 - 09:30 2.25 ZONISO P WEXIT across jewelries & GLMs. Dump cmt contaminated KCL fluid. Decide to pump eline slack management with CSH in hole as cement is already ~ 500psi compressive strength. 09:30 - 09:45 0.25 ZONISO P WEXIT Held PJSM for pumping eline slack management with CSH in hole. 09:45 - 10:15 0.50 ZONISO P WEXIT Line up & reverse circ 55bbls of 2% KCL C~3 4.Obpm/1700psi W HP, stopping & restarting pumps after every 10bbls pumped. Did not hear any audible sound of cable movement. Observe no losses while reverse circulating thru CSH. S/D pump & break injector. Pull out +/-385' of a-line from CSH. Cut off excess a-line & boot end of a-line. S/B injector. 10:15 - 11:00 0.75 ZONISO P WEXIT PJSM. L/D Baker pull disconnect, R/B 9 stands of 1-1/4" CSH & UD cementing nozzle. 11:00 - 12:00 1.00 STWHIP P WEXIT Stab injector on well. Shut-in swab valve. Reverse circ 2% KCL ~ 5.1 bpm/3200psi. Audible sound of cable movement stopped after 25bbls pumped. Stopped pump, restart pumps & reverse circ an additional 10bbls of fluid @ 5.Obpm/3400psi till a-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 8bbls of fluid ~ 5.4bpm/3620psi till a-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 4bbls of fluid ~ 5.4bpm/3750psi till a-line stopped moving again. Stopped pump, restart pumps & reverse circ an additional 4bbls of fluid ~ 5.4bpm/3750psi & did not hear any a-line movement. Pump 10bbls of fresh water & S/D pumps. S/B injector. 12:00 - 12:15 0.25 STWHIP P WEXIT Hold PJSM for cutting CT. 12:15 - 13:00 0.75 STWHIP P WEXIT R/U hydraulic cutter to cut CT for slack management. Cut 367' of CT until a-line cable is exposed. Have 17053' of eline CT left on reel. Cement C 1000psi compressive strength. 13:00 - 14:30 1.50 STW HIP P WEXIT Behead & install SLB CTC. Pull test to 35k. Allow for 2.5' of eline. M/U UOC &rehead eline. Conduct eline conductivity test OK. Meg eline - OK ~ >20megs. Suspect CT is frozen. M/U swizzle stick & stab injector on welt. 14:30 - 15:45 1.25 STWHIP P WEXIT RIH to 450' to thaw any possible ice in the CT. Establish circ. PUH to surface & jet BOP stack thoroughly. S/B injector & L/D swizzle stick. M/U test cap. Plfest CTC & UOC to 3500psi. Break UOC & observe that eline cable has pulled off from the UOC. Cut off & boot end of a-line. M/U nozzle & stab injector on well. 15:45 - 17:00 1.25 STWHIP N SFAL WEXIT Pump one CT vol back into the reel in normal circ mode to complete slack management. 17:00 - 18:00 1.00 STWHIP N SFAL WEXIT Pop-off well. Cut 3' of CT to expose 2.5' of a-line. Behead & install SLB CTC. Pull test to 35k. Circ ~ 0.4bpm for 4 mins to warm up CT. M/U UOC &rehead eline. Circ ~ 0.4bpm for 4 mins to warm up CT. Conduct eline conductivity test - OK. Meg eline - OK. P/Test CTC & UOC to 3500psi - OK. 18:00 - 18:15 0.25 STWHIP P WEXIT Hold PJSM for M/U milling BHA. 18:15 - 18:45 0.50 STWHIP P WEXIT M/U window milling BHA #3 with a 3.80" HC DSM, 3.79" diamond string reamer, Baker straight Xtreme motor, 1 jt of 2-3/8" PH6 tbg, BHI DGS, DPS, EDC, P&C, SWP & LOC. BHA OAL - 89.77'. M/U injector. Zero SLB mechanical counter & open EDC. 18:45 - 21:40 2.92 STWHIP P WEXIT RIH window milling BHA #3. Shut in well while RIH till WHP Printed: 3/26/2007 10:31:30 AM 3p,~`~ BP EXPLORATION Page 5 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 3/18/2007 18:45 - 21:40 2.92 STWHIP P WEXIT builds to 1000psi. P/T wellbore to 1000psi. Lost 100psi in 5mins. Bleed off WHP & continue RIH. Tag top of cement at 13,159'. 21:40 - 23:15 1.58 STWHIP P WEXIT Mill cement. 2.8 bpm, 2250 psi, 40 fph, 1-2 K WOB. Full returns. Tag whipstock at 13,211'. Correct depth to 13,208'. 23:15 - 00:00 0.7 i 3.8 wm ow t ru 4-1 - s otte finer. pm, 2300-2500 psi, 3-4K WOB. Milled to 13209'. 3/19/2007 00:00 - 03:00 3.00 STWHIP P WEXIT Mill 3.8" window. 2.7 bpm, 2100-2660 psi, 0.5 fph, 5-6 K WOB. Slow milling Milled to 13211'. 03:00 - 04:30 1.50 STWHIP P WEXIT Mill 3.8" window. 2.7 bpm, 2000-3000 psi, 0.5 fph, 6K WOB. Stacking wt. Backream up to 13150'. Ream down. 04:30 - 06:00 1.50 STWHIP P WEXIT Mill 3.8" window. 2.6 bpm, 2050-2800 psi, Stacking wt 1 ft off bottom. Back ream again and ream down. Stacking wt. 06:00 - 07:00 1.00 STWHIP P WEXIT Mill window from 13211.5' to 13212' with 2.65/2.65bpm, 2050/2600psi & 7k DWOB. Up Wt = 41.5k, Down Wt = 20k. Getting metal shavings on ditch magnets. 07:00 - 08:00 1.00 STWHIP P WEXIT Mill window & stall @ 13212.9' with 2.65/2.65bpm, 2050/2600psi & 7k DWOB. PUH. RBIH & ease into milling from 13208'. Mill down & stall again ~ 13210.8'. Suspect string reamer is ~ TOW/S. 08:00 - 08:30 0.50 STW HIP P WEXIT Backream/Ream window area 2x from 13200' to 13210'. See improvement in wt transfer. 08:30 - 09:15 0.75 STWHIP P WEXIT Mill window from 13210' to 13211' with 2.65/2.65bpm, 2050/2200psi & 0.5k DWOB. 09:15 - 09:30 0.25 STW HIP P WEXIT Mill window from 13211' to 13212' with 2.65/2.65bpm, 2050/2250psi & 0.8k DWOB. 09:30 - 10:00 0.50 STWHIP P WEXIT Mill window from 13212' to 13214' with 2.65/2.65bpm, 2050/2250psi, 2.5k DWOB & 4fph ave ROP. 10:00 - 10:15 0.25 STWHIP P WEXIT Control mill window from 13214' to 13215' with 2.65/2.65bpm, 2050/2200psi & 3.5k DWOB & 4fph ave ROP. 10:15 - 10:30 0.25 STWHIP P WEXIT Control mill & exit into formation C~ 13216' with 2.65/2.65bpm, 2050/2200psi & 3.5k DWOB & 4fph ave ROP. 10:30 - 12:15 1.75 STWHIP P WEXIT Mill 10' of formation to 13226' with 2.55/2.55bpm, 2050/2400psi, 8fph ave ROP & 5.5k DWOB. 12:15 - 15:45 3.50 STWHIP P WEXIT Swap wellbore to reconditioned 8.6ppg flopro mud with 12ppb K-G & 3% L-T. Meanwhile backream/dress window/rat hole 3x & drift 2x. Window looks clean. Geo seeing shublik shale formation in BUS. Tentative window depths are: TOWSlTOW = 13208', BOW = 13216', TD = 13226'. 15:45 - 17:45 2.00 STWHIP P WEXIT Paint EOP @ 12000' & POOH window milling BHA #3. 17:45 - 18:00 0.25 STWHIP P WEXIT Hold PJSM for UD milling BHA. 18:00 - 18:45 0.75 STWHIP P WEXIT UD BHA #3 & inspect mills. Window mill gauge 3.80" go / 3.79" no-go & string mill gauge 3.78" go / 3.77" no-go. Wear on window mill face indicate center crossed the liner wall. 18:45 - 19:00 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for M/U BHI drilling BHA. 19:00 - 22:00 3.00 DRILL P PROD1 M/U BHI build BHA #4 with HC Bi-center bit, 3.2 deg motor and Printed: 3/26/2007 10:31:30 AM BP EXPLORATION Page 6 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ; Task Code - - - NPT Phase ~ Description of Operations 3/19/2007 19:00 - 22:00 3.00 DRILL P PROD1 RES tool. OAL = 78.88'. 22:00 - 22:30 0.50 DRILL P PRODi RIH with Build BHA #4. Circ. at 0.2 bpm. Correct -26' at EOP flag at 12000'. Cont. RIH. 22:30 - 23:10 0.67 DRILL P PROD1 Log GR tie-in down from 13140' at 150 FPH. Add 3.4' to CTD. RIH and tag bottom at 13228'. 23:10 - 00:00 0.83 DRILL P PROD1 Drill Build section. 2.6 bpm, 3340-3900 psi, 2K WOB, 150L, 150fph. Drilled to 13,233'. 3/20/2007 00:00 - 02:00 2.00 DRILL P PROD1 Drilled build section in Shublik. 2.6 bpm, 3200-3800 psi, 145E TF, 12 fph, 2-3 K WOB Drilled to 13,254'. 02:00 - 04:30 2.50 DRILL P PROD1 Drilled build section in Shublik. 2.6 bpm, 3200-3800 psi, 120E TF, 14 fph, 2-3 K WOB Drilled to 13,282'. 04:30 - 06:00 1.50 DRILL P PROD1 Drilled build section in Shublik. 2.6 bpm, 3200-3900 psi, 80L TF, 20 fph, 2-3 K WOB Drilled to 13,305'. 06:00 - 06:35 0.58 DRILL P PROD1 Wiper trip clean to window. RBIH to btm. Up wt = 32k; Run-in wt = 14k; IAP = 170psi; OAP = 175psi; PVT = 305bb1s. 06:35 - 07:30 0.92 DRILL P PROD1 Drill Shublik 'C' to 13320' with 55-65L TF, 2.55/2.55bpm, 3200/3350psi, 2k DWOB & 15fph ave ROP. Should be in zone-4 now. 07:30 - 09:15 1.75 DRILL P PROD1 Drill to 13415' with 40-50L TF, 2.55/2.55bpm, 3200/3450psi, 2k DWOB & 55fph ave ROP. 09:15 - 09:45 0.50 DRILL P PROD1 Drill to 13444' with 60L TF, 2.55/2.55bpm, 3200/3550psi, 2k DWOB & 65fph ave ROP. Drill into wet zone (<6 ohm.m) from 13420'. 09:45 - 10:00 0.25 DRILL P PROD1 Wiper trip clean to window. RBIH to btm. Up wt = 37k; Run-in wt = 14k; IAP = 270psi; OAP = 230psi; PVT = 305bb1s. 10:00 - 11:00 1.00 DRILL P PROD1 Drill to 13489' with 60L TF, 2.60/2.60bpm, 3200/3650psi, 2k DWOB & 55fph ave ROP. 11:00 - 11:05 0.08 DRILL P PROD1 Short BHA wiper. Up wt = 37k; Run-in wt = 14k; IAP = 330psi; OAP = 260psi; PVT = 300bb1s. 11:05 - 13:00 1.92 DRILL P PROD1 Drill & land build/turn section ~ 13630' with 60-80L TF, 2.60/2.60bpm, 3250/3750psi, 2k DWOB & 75fph ave ROP. 13:00 - 15:30 2.50 DRILL P PROD1 POOH to P/U lateral BHA. Paint EOP flag @ 10500'. Open up EDC above window & circ OOH. 15:30 - 15:45 0.25 DRILL P PRODi Hold PJSM & THA for C/O drilling BHA. 15:45 - 17:00 1.25 DRILL P PROD1 OOH. S/B injector. Flush BHA with water & B/D with air. C/O BHI HOT package (near-bit inclination was not working on last run). Check bit - 2/2/I. C/O bit & reset motor bend to 1.2degs. Observe small piece of metal missing from the USMPR sub. Precautionarily C/O USMPR sub. 17:00 - 17;45 0.75 DRILL P PROD1 M/U lateral BHA #5 with 1.2deg X-treme motor, Coiltrack BHA & rebuilt Hughes 3-3/4" x 4-1/8" RWD2ST bicenter bit #2. Scribe tools. Function test BHA - OK. M/U injector. 17:45 - 20:30 2.75 DRILL P PROD1 RIH with lateral BHA #5. Correct to flag, -30' CTD. RIH to 13,100'. 20:30 - 21:30 1.00 DRILL N RREP PROD1 Work on SWS level wind. C/O tugger cable. 21:30 - 21:45 0.25 DRILL P PROD1 Log GR tie-in at 13,200'. Add 4.5 ft to CTD. 21:45 - 22:00 0.25 DRILL P PROD1 RIH clean to bottom. Tag at 13,631'. 22:00 - 00:00 2.00 DRILL P PROD1 Drill lateral, 2.5 bpm, 3200-3900 psi, 90L, Stacking wt. Several stalls, coil is not sliding. Printed: 3!26/2007 10:31:30 AM • • BP EXPLORATION Page 7 of 11 Operations Summary Report Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code ; NPT Phase Description of Operations -- -F -- ~-- 3/20/2007 22:00 - 00:00 - 2.00 DRILL P - - _ PROD1 Tag bottom lightly and then motor stalls when coil sticks /slips down hole. Order new FloPro to get better weight transfer. This is a used system that has 420' on it. Drilled to 13,640'. 3/21/2007 00:00 - 02:00 2.00 DRILL P PROD1 Drill lateral, 2.5 bpm, 3200 - 4000 psi, 90L, 96 deg incl. Coil not sliding, stack wt and motor stalls. Wearing out coil with very little progress. Drilled to 13,653'. 02:00 - 02:30 0.50 DRILL N WAIT PROD1 Wiper trip to window while waiting for new FloPro. 02:30 - 04:30 2.00 DRILL N WAIT PROD1 Wait for vac trucks to arrive with new FloPro. 04:30 - 05:00 0.50 DRILL N WAIT PROD1 RIH while pumping new FloPro into coil. Coil capacity = 68 bbls. RIH clean to bottom. 05:00 - 06:50 1.83 DRILL P PROD1 Drill Lateral, 2.5 bpm, 3200-3900 psi, 120L, 99 deg incl. 80 FPH, Drilled to 13,800'. 06:50 - 07:30 0.67 DRILL P PROD1 Wiper trip clean to window. RBIH to btm. Up wt = 35k; Run-in wt = 14k; IAP = 5psi; OAP = Opsi; PVT = 300bb1s. 07:30 - 07:45 0.25 DRILL P PROD1 Drill to 13820' with 85L TF, 2.75/2.75bpm, 3200/3550psi, 2k DWOB & 85fph ave ROP. 07:45 - 08:45 1.00 DRILL P PROD1 Drill to 13846' with 95R TF, 2.6/2.6bpm, 2900/3250psi, 2k DWOB & 45fph ave ROP. 08:45 - 11:00 2.25 DRILL P PROD1 Drill to 13950' with 120R TF, 2.7/2.7bpm, 3000/3500psi, 2k DWOB & 55fph ave ROP. 11:00 - 12:00 1.00 DRILL P PROD1 W iper trip to window. RIH. Clean trip. 12:00 - 12:30 0.50 DRILL P PROD1 Drill lateral, 2.6 bpm, 2900 - 3600 psi, 120R, 97 deg incl, Stacking wt to slide, stalling motor. Drilled to 13,953' 12:30 - 13:00 0.50 DRILL P PROD1 Circ. bottoms up for GEO sample. 13:00 - 15:00 2.00 DRILL P PROD1 Drill lateral, 2.4 bpm, 2700 - 3100 psi, 110R, 96 deg incl, Stacking wt to slide and stalling motor. Reduced pump rate to 2.4 bpm and got slight improvement in slide. Drilled to 14,005'. 15:00 - 18:15 3.25 DRILL P PROD1 Drill lateral, 2.8 bpm, 3200 - 3900 psi, 110R, 95 deg incl, Inc. pump rate to 2.8 bpm and got better slide to bottom. Still stacking and stalling. Drilled to 14,090'. 18:15 - 19:15 1.00 DRILL P PROD1 Wiper trip to window. Clean hole. Pull above top of 4-1/2" liner and clean out 7-5/8" csg. Up wt = 32k; Run-in wt = 14k; IAP = 320psi; OAP = 230psi; PVT = 247 bbls 19:15 - 21:15 2.00 EVAL P PROD1 Log GR tie-in at window. Add 6' correction. MAD Pass to btm. 21:15 - 22:00 0.75 DRILL P PROD1 Tag btm at 14090'. Drill to end of polygon at 14110' w/ 105R TF, 95 deg incl, 2.56/2.56 bpm, 3100 psi, 2.75k DWOB, 40 fph ave ROP. Call TD at 14110'. 22:00 - 00:00 2.00 EVAL P PROD1 POOH laying in liner pill from TD and displace w/ FloPro. Clean hole. Open EDC above window and circ OOH. 3/22/2007 00:00 - 01:00 1.00 EVAL P PROD1 Finish POOH. 01:00 - 01:15 0.25 EVAL P PROD1 Hold PJSM and THA for UD BHA. 01:15 - 02:15 1.00 EVAL P PROD1 OOH. S/B injector. Flush BHA w/ water and B/D w/ air. UD BHA. Bit Graded 1/1/I Printed: 3/26/2007 10:31:30 AM • BP EXPLORATION Page 8 of 1 1 Operations Summary Report Legal Welj Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To ~ A-42 A-42 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code ~ E NPT Start Rig Rig Phase Spud Date: 3/15/2007 : 3/15/2007 End: 3/25/2007 Release: 3/25/2007 Number: N1 Description of Operations 3/22/2007 02:15 - 02:45 0.50 CASE P RUNPRD M/U nozzle to CTC and stab injector on well. Shut in swab. Prep lines for B/D CT. 02:45 - 03:00 0.25 CASE P RUNPRD PJSM for B/D CT with N2. 03:00 - 03:15 0.25 CASE P RUNPRD P/T N2 lines - ok 03:15 - 04:00 0.75 CASE P RUNPRD Pump 50 bbls water, 15 bbls bleach, 20 bbls corrosion inhibitor followed by 15 bbls of McOH spacer 04:00 - 05:45 1.75 CASE P RUNPRD Blow dow CT w/ N2. Bleed down. Pick injector and prep end of coil for internal grapple. 05:45 - 06:00 0.25 CASE P RUNPRD PJSM. Review procedure, hazards, and mitigation for pulling E-coil to reel and securing to it. 06:00 - 09:00 3.00 CASE P RUNPRD Pull test grapple and cable. Pull coil stub to reel. Secure coil on reel. Prep reel to pick. 09:00 - 11:00 2.00 CASE N WAIT RUNPRD Wait on Veco truck /trailer to swap reels. Our trailers had been borrowed by Nordic 2. 11:00 - 11:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for swapping reels with overhead crane. 11:15 - 14:00 2.75 CASE P RUNPRD Lower E-coil reel to Veco trailer and secure on trailer. Pick up E-free coil off of second trailer and secure in reelstand. Install hardline and valves inside reel. 14:00 - 17:15 3.25 CASE P RUNPRD Pull E-free coil to injecter with internal grapple and cable. Stab coil. Prep rig floor to run liner. 17:15 - 17:30 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running liner. 17:30 - 19:30 2.00 CASE P RUNPRD Run 3-3/16", 6.2#, L-80, TCII Liner with BOT float equipment as per program. 36 jts of 3-3/16" liner and 2 jts of 3-1/2" Liner. OAL = 1,171.26'. TD = 14,110'. Top of BOT Deployment sleeve = 12,938.74'. 19:30 - 21:00 1.50 CASE P RUNPRD P/U injector. Cut CT. M/U BOT CTC. Pull test to 35k. 21:00 - 23:15 2.25 CASE P RUNPRD P/test hardline to reel and inner reel valve to 4000 psi - OK. Pump 5bbls of McOH ahead & 5bbls of water behind. Pump & fill CT with mud. Load/launch wiper dart. Chase dart with mud & pig CT. Dart bumped on catcher ~ 59.0 bbls. P/test CTC to 4000psi - OK. M/U injector. Nordic MM reading correct densities for mud, water & McOH. 23:15 - 00:00 0.75 CASE P RUNPRD RIH with liner on coil circ @ min rate thru the cementing high-pressure filters. 3/23/2007 00:00 - 01:45 1.75 CASE P RUNPRD Continue to RIH with liner on coil circ ~ min rate thru the cementing high-pressure filters. 01:45 - 02:30 0.75 CASE P RUNPRD Continue RIH with liner on coil circ C~ 0.4bpm. Wt check: Up = 40k. Run-in wt = 18k. Continue RIH smoothly @ 60fpm thru window into OH. Set down ~ 13865', 13880'. P/U & run thru. Set down 5X @ 13890', increase circ to 1.0 bpm. P/U & run thru. circ ~ 0.4 bpm. Set down ~ 13943'. P/U & run thru. Tag btm ~ 14135'. P/U 2x ~ 42k & retag TD @ same depth. Reset depth to 14110'. 02:30 - 03:15 0.75 CASE P RUNPRD Establish circ. Load 5/8" aluminum ball &circ with mud ~ 2.68/2.63bpm & 2900psi. Set down 10k down on CTLRT. Continue circ ball to seat. Slow down to 0.49/0.42bpm ~ 45bbls away. Ball on seat ~ 54.4bbls. Pressure up to 4200psi & release CTLRT. P/U ~ 38k & confirm release. 03:15 - 05:00 1.75 CASE P RUNPRD Circ well to 2% KCL ~ 2.40/2.35bpm & 1400psi. Send used FloPro to MI for reconditioning. Meanwhile R/U SLB Printed: 3/26/2007 10:31:30 AM • • BP EXPLORATION Page 9 of 11 Operations Summary Report. Legal Well Name: A-42 Common Well Name: A-42 Spud Date: 3/15/2007 Event Name: REENTER+COMPLETE Start: 3/15/2007 End: 3/25/2007 Contractor Name: NORDIC CALISTA Rig Release: 3/25/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task ;Code NPT Phase Description of Operations 3/23/2007 03:15 - 05:00 1.75 CASE P RUNPRD cementers. 05:00 - 06:15 1.25 CASE P RUNPRD Load balance 2% KCL into pits & mix 2ppb bio displacement pill. Meanwhile continue circulating 2% KCL around fps 2.42/2.38bpm & 1100psi. Circ. at 1.64 bpm with 1.62 bpm returns at 600 psi. Stack wt on liner. 06:15 - 06:30 0.25 CEMT P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping liner cement job. 06:30 - 07:45 1.25 CEMT P RUNPRD Batch mix cement. Press test cement line. 5% loss of returns while circ KCL. Add 1 bbl to cement volume. 16 + 1 bbl. 07:45 - 09:00 1.25 CEMT P RUNPRD Stage 3 bbl water ahead. Stage 17 bbl, 15.8 ppg, G Cement. 2.2 bpm, 2200 psi Stop pump. Close inner reel valve. clear cement line. Insert dart. Displace dart/cement with 2# Biozan. 10 bbl displ, 2.6 bpm, 2.5 bpm returns, 1150 psi 20 bbl displ, 2.5 bpm, 2.4 bpm returns, 1900 psi 30 bbl displ, 2.5 bpm, 2.4 bpm returns, 2130 psi 40 bbl displ, 2.5 bpm, 2.4 bpm returns, 1970 psi 50 bbl displ, 2.5 bpm, 2.5 bpm returns, 1800 51 bbl displ, cement at shoe, zero out totalizer. 57 bbl displ, 2.5 bpm, 2.4 bpm returns, 2200 psi, slow pump to 0.7 bpm, 550 psi. Dart landed on LW P at 60.0 bbls. Sheared at 3500 psi 62 bbl displ, 2.5 bpm, 2.4 retur 2420 psi, 67 bbt displ, 2.5 bpm, 2.4 bpm returns, 2560 psi, Slow pmup to 1 bpm. 68 bbl displ, 1.2 bpm, Bumped LWP at 68.6 bbls, bumped with 2400 psi, Bleed off press and check floats, OK. Press up to 300 psi and sting out at 39K up wt. Cement job went well. Out totalizer indicated full 17 bbls returns. 09:00 - 11:30 2.50 CEMT P RUNPRD POH, circ. 2bbl Biozan above liner top at 0.5 bpm, POH replacing coil voidage. 0.5 bpm, 250 psi. 11:30 - 12:30 1.00 CEMT P RUNPRD LD cementing tools, Load 2-1/8" motor and logging tools on rig. 12:30 - 13:00 0.50 EVAL P LOWERI PJSM for picking up cleanout and logging string. Note: Nordic derrick hand went to medic because it appears he has the flu. 13:00 - 14:30 1.50 EVAL P LOWERI PU 2.71 mill, 2-1/8" motor, 2 jts CHS, Logging carrier with MGR/CCL, circ sub, disconnect, 20 stands of 1-1/4" CSH, MHA. SLB lab confirmed the cement is at 500psi compressive strength. 14:30 - 15:00 0.50 EVAL N SFAL LOWERI RIH with logging tools. Pressured up after 1 bbl. RIH to 3000' in attempt to thaw. No luck. PUH to BHA. 15:00 - 15:45 0.75 EVAL N SFAL LOW ER1 PJSM for pulling wet and laying down BHA. 15:45 - 16:45 1.00 EVAL N SFAL LOWERI Verify circulation in the coil. LD CSH wet. We are seeing a lot of scale flushed out of the CSH. Call BOT for replacement tools. They are short on people and they could be a while. Last joint, Disco, and Circ sub all plugged with scale. We will Printed: 3/26/2007 10:31:30 AM • BP EXPLORATION Page 10 of 11 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To ~ A-42 A-42 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT 3/23/2007 15:45 - 16:45 1.00 EVAL N SFAL 16:45 - 17:30 0.75 EVAL N SFAL 17:30 - 18:00 0.50 EVAL N SFAL 18:00 - 19:00 1.00 EVAL N SFAL 19:00 - 20:00 1.00 EVAL N 20:00 - 23:30 3.50 EVAL P 23:30 - 00:00 0.50 EVAL P 3/24/2007 00:00 - 00:30 0.50 EVAL P 00:30 - 01:45 1.25 EVAL P 01:45 - 04:00 2.25 EVAL P 04:00 - 05:00 1.00 EVAL P 05:00 - 06:00 1.00 EVAL N WAIT 06:00 - 06:30 0.50 EVAL P 06:30 - 08:00 1.50 EVAL N WAIT 08:00 - 08:30 0.50 CEMT P 08:30 - 10:00 1.50 PERFO P 10:00 - 10:30 0.50 PERFO P 10:30 - 12:00 1.50 PERFO P 12:00 - 14:15 2.25 PERFO N SFAL Spud Date: 3/15/2007 Start: 3/15/2007 End: 3/25/2007 Rig Release: 3/25/2007 Rig Number: N1 Phase Description of Operations LOWERI PU new motor, circ sub, and disco. Lay out logging tool and pull from carrier. There was a minor amount of scale present. We estimate -3-4 gal of scale was recovered. LOWERi Wait on BOT to deliver tools. LOW ER1 PU 2.71 mill, 2-1/8" motor, 2 jts CHS, Logging carrier with MGR/CCL, circ sub, disconnect LOW ER1 Crew change, handover, and safety meeting for running CSH LOWERI PU 20 stands of 1-1/4" CSH, MHA. Circulate LOWERI RIH with memory logging BHA To 12084 set down increase pump rate to 1.6 bpm 1850 psi. Motor work. Continue to RIH at 12847 we had motor work. Continue to RIH MW at 13000'. LOWERI Log from 13000 to PBTD 14097' uncorrected. LOWERI Log from PBTD to 12750 60 fpm. Cement in returns shipped 86 bbls outside. LOWERI RIH to PBTD and spot in 20 bbl of perf pill. LOWERI Flag EOP C~ 11600' POH. LOWERI Stand back CSH. LOWERI Wait on little red to pressure up the IA to 1000psi for the lap test. All units are currently working. Well will get an update after crew change. LOWER? PU swizzle stick and wash out BOP stack. Good GR/CCL data PBTD = 14070 TOL= 12937 LOW ER1 Got update from Little Red and they will be busy until this afternoon. Look into testing with the rig but diesel transports are just as hard to come by. Make several calls to determine if the 7" x 4-1/2" HBBP-T packer is an affected model. Got the OK from Anna Dube (W IE) and AI Schmoyer (PE) that we will be OK to test the lap to 2000 psi without pressure on the IA. They have had problems with all the 7" x 4-1/2" and 7-5/8" x 4-1/2" packers but mostly with the -R (retrievable) model. RUNPRD Test liner Lap to 2000psi 0800 2060 psi 0815 2095 psi 0823 2073 psi 0830 2065 psi 0836 2065 psi Liner Lap *PASSED* Conduct safety meeting for loading guns and outside work . Note the ambient temp is -40F with a slight wind. Approved use of loader at cold temps. LOW ER1 Finish loading Perf guns and blanks. OAL 404.6'. Lay out guns and prep rig floor for running guns. Notice the packing on Pump 2 is leaking. Pump 1 has been down to replace the bearings. Use both charge pumps to circulate fluid through the coil. LOW ER1 PJSM with the TCP hand for running perforating guns. LOW ER1 PU perf guns, firing head, lower disc, 30 jts CSH, and MHA LOW ER1 Wait on Nordic to swap packing on Pump 2. Pump 1 is under major repairs. Found the spare packing rings were the 1/8" out of gauge. Printed: 3/26/2007 10:31:30 AM • • BP EXPLORATION Page 11 of 11 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To A-42 A-42 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT 3/24/2007 14:15 - 17:30 3.25 PERFO P 17:30 - 17:45 0.25 PERFO P 17:45 - 19:00 1.25 PERFO P 19:00 - 22:00 3.00 PERFO P 22:00 - 23:00 1.00 PERFO P 23:00 - 23:15 0.25 PERFO P 23:15 - 00:00 0.75 PERFO P 3/25/2007 00:00 - 00:30 0.50 PERFO P 00:30 - 04:00 3.50 PERFO P 04:00 - 04:10 0.17 RIGD P 04:10 - 05:30 1.33 RIGD P 05:30 - 06:00 0.50 RIGD P 06:00 - 08:00 2.00 RIGD P Spud Date: 3/15/2007 Start: 3/15/2007 End: 3/25/2007 Rig Release: 3/25/2007 Rig Number: N1 Phase Description of Operations LOWERI RIH with pert guns. Tag bottom at 14092 (-22ff) correction to 14070'. Pump 10 bbl ball drop pill. Launch 5/8 steel ball with 10bb1 ball pill behind and pump down the coil at 2.5 bpm. LOWERI Saw 300psi pressure drop as the pump was being brought to 0.5bpm at 50bb1 in(coil volume 61 bbl). May have fired the guns. Not clear from surface shot detection. Continue to Pump to 69 bbl in. Shut down pumps and pull off bottom. Run back on depth shut in well. Pressure up on well to 2000 psi at 0.3 bpm. Shut down and monitor. Pressure bled to 1400psi. in 4 mins. Open well and pump at 2.5bpm and observe similar pressure we saw when pumping the ball around. Indication (from bleed off) are that we have perforated. However, the pressures are not as we expect. We will pump another ball around to ensure we have done everything possible to ensure the guns have fired prior to pull them out of hole. Perforated interval: 13688' - 13828' 13848' - 13908' 14028' - 14068' LOWERI Drop second ball and circulate to firing head. Displaced with 65 bbls. No indication that second ball landed. LOWERI POH. LOWERI Stand back 15 stands of CSH .Found XO betweeen disconnect and CSH backed off 2 turns on the MT connection. The connection had been locktighted. Got Lucky!! LOW ER1 PJSM for LD perforating guns. Because of uncertainty of whether or not guns might not have fired. PJSM discussed the posibility of not firing and that a second PJSM would be required if the first gun confirmed that they didn't fire. Also discussed trapped pressure, perforation burrrs, and spill from guns. LOW ER1 LD perf guns. Guns had fired. LOWERI Complete LD guns. LOWERI MU Nozzel and RIH to 2400'. Circulate McOh to nozzel and lay in freeze protection. POST PJSM for N2 blow down. POST Blow down Reel with N2 following a 6 bbl Methanol spear. PT N2 lines to 3000 psi. Pump N2 and Blow down to tiger tank. POST Set BPV. POST Cut CTC off install grapple. Pull back coil tubing to reel. RREL at 0800. 9.46 DOL. The conversion to 2" and rig move will be captured on G-04B. Printed: 3/26/2007 10:31:30 AM t ,` by BP Alaska Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 3!26/2007 Time: 15:29:18 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: A-42, True North Site: PB A Pad Vertical (TVD) Reference: 48:42 1/10/1995 00:00 85.5 Well: A-42 Section (VS) Reference: Well (O.OON,O.OOE,176.45Azi) ~ R'ellpath: A-42A Survey Calculation Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006 Site: PB A Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5946131.57 ft Latitude: 70 15 35.209 N From: Map Easting: 653509.42 ft Longitude: 148 45 32.775 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.17 deg Well: A-42 Slot Name: 42 A-42 Well Position: +N/-S 1279.63 ft Northing: 5947415.35 ft Latitude: 70 15 47.794 N +E/-W 221.38 ft Easting : 653704.66 ft Longitude: 148 45 26.332 W Position Uncertainty: 0.00 ft Wellpath: A-42A Drilled From: A~2PB2 Tie-on Depth: 13195.56 ft Current Datum: 48:42 1 /10/1995 00:00 Height 85.50 ft Above System Datum: Mean Sea Level Magnetic Data: 7/25/2006 Declination: 24.24 deg Field Strength: 57641 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 38.50 0.00 0.00 176.45 Survey Program for Definitive Wellpath Date: 7/25/2006 Validated: Yes Version: 4 Actual From To Survey Toolcode Tool Name ft ft 100.00 5300.00 1 : Gyrodata gyrocompassing m/ GYD-GC-MS Gyrodata gyrocompassing m/s 5350.00 13149.27 2 : MWD -Standard (5350.00.13 MWD MWD -Standard 13175.00 13195.56 2 : MWD -Standard (13175.00-1 MWD MWD -Standard 13208.00 14110.00 MWD (13208.00.14110.00) MWD MWD -Standard Annotation MD TVD ft ft 13195.56 8946.23 TIP 13208.00 8951.46 KOP 14110.00 9010.00 TD Survey: MWD Start Date: 3/26/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path ~p~- t3 O by BP Alaska Baker Hughes INTEQ Survey Report iNTEQ Company: BP Amoco Date: 3/26/2007 Time: 15:29:18 Page: 2 Field: Pr udhoe Bay Co-ordinate(NE) Reference: Well: A-42, True North Site: PB A Pad Vertical (TVD) Reference: 48:42 1/10/1995 00:00 85.5 Well: A-42 Sectio n (VS) Reference: Well (O.OON,O.OOE,176.45Azi) Wellpath: A-42A Snrvey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim T~"D 5ys TVD N/S E/W h1apN MapE VS DLS Toot ft deg deg ft ft ft ft ft ft ft deg/100ft 13195.56 64.10 178.90 8946.23 8860.73 -8017.08 -41.92 5939399.67 653826.40 7999.10 0.00 MWD 13208.00 66.13 178.07 8951.46 8865.96 -8028.36 -41.62 5939388.40 653826.93 8010.37 17.40 MWD 13229.78 60.49 173.85 8961.25 8875.75 -8047.76 -40.27 5939369.04 653828.68 8029.82 31.14 MWD 13259.14 51.88 167.25 8977.58 8892.08 -8071.79 -36.34 5939345.09 653833.10 8054.05 34.74 MWD 13289.40 47.34 154.11 8997.24 8911.74 -8093.48 -28.83 5939323.57 653841.05 8076.15 36.26 MWD 13319.60 52.65 140.85 9016.69 8931.19 -8112.84 -16.36 5939304.46 653853.91 8096.25 37.89 MWD 13351.33 59.64 129.84 9034.40 8948.90 -8131.45 2.18 5939286.23 653872.82 8115.98 36.23 MWD 13381.31 68.56 123.67 9047.49 8961.99 -8147.52 23.78 5939270.61 653894.74 8133.35 35.02 MWD 13411.97 75.88 115.06 9056.86 8971.36 -8161.77 49.20 5939256.88 653920.45 8149.15 35.83 MWD 13441.17 79.56 104.73 9063.09 8977.59 -8171.45 75.99 5939247.76 653947.43 8160.47 36.78 MWD 13472.22 82.15 92.70 9068.04 8982.54 -8176.07 106.23 5939243.75 653977.76 8166.96 39.15 MWD 13508.19 85.45 80.26 9071.94 8986.44 -8173.87 141.85 5939246.68 654013.32 8166.96 35.58 MWD 13538.67 90.62 69.25 9072.99 8987.49 -8165.87 171.18 5939255.28 654042.48 8160.80 39.88 MWD 13568.99 93.20 60.15 9071.97 8986.47 -8152.94 198.55 5939268.77 654069.57 8149.58 31.18 MWD 13598.40 96.25 46.60 9069.54 8984.04 -8135.50 222.02 5939286.68 654092.68 8133.63 47.07 MWD 13630.86 99.53 38.90 9065.08 8979.58 -8111.92 243.83 5939310.70 654114.00 8111.45 25.57 MWD 13662.45 99.58 32.99 9059.83 8974.33 -8086.71 262.11 5939336.27 654131.76 8087.42 18.45 MWD 13700.26 97.24 29.55 9054.30 8968.80 -8054.74 281.51 5939368.62 654150.51 8056.72 10.92 MWD 13730.56 96.95 24.37 9050.55 8965.05 -8027.95 295.14 5939395.69 654163.59 8030.82 16.99 MWD 13763.93 97.39 21.85 9046.39 8960.89 -7997.50 308.14 5939426.39 654175.96 8001.23 7.61 MWD 13792.77 97.65 14.27 9042.61 8957.11 -7970.34 316.99 5939453.73 654184.26 7974.67 26.07 MWD 13826.51 98.35 13.21 9037.91 8952.41 -7937.89 324.93 5939486.33 654191.53 7942.77 3.74 MWD 13863.69 96.97 16.95 9032.96 8947.46 -7902.32 334.52 5939522.09 654200.39 7907.86 10.64 MWD 13893.97 96.49 22.00 9029.40 8943.90 -7873.97 344.54 5939550.63 654209.83 7880.20 16.64 MWD 13925.91 96.43 27.42 9025.81 8940.31 -7845.15 357.80 5939579.71 654222.50 7852.25 16.86 MWD 13958.68 94.67 32.89 9022.64 8937.14 -7816.96 374.18 5939608.23 654238.30 7825.13 17.46 MWD 13988.94 94.98 37.81 9020.09 8934.59 -7792.38 391.62 5939633.16 654255.23 7801.67 16.23 MWD 14020.69 94.01 44.65 9017.60 8932.10 -7768.59 412.47 5939657.37 654275.59 7779.22 21.69 MWD 14050.94 94.55 47.23 9015.34 8929.84 -7747.61 434.14 5939678.78 654296.83 7759.63 8.69 MWD 14062.40 95.26 48.90 9014.36 8928.86 -7739.98 442.64 5939686.59 654305.17 7752.54 15.79 MWD 14110.00 95.26 48.90 9010.00 8924.50 -7708.82 478.36 5939718.46 654340.24 7723.65 0.00 MWD `TREE = 4" Mc EV OY WELLHEAD= McEVOY ACTUATOR= BAKER KB. ELEV = 85.5' BF. ELEV = 54.67' KOP= 13208' Max Angle = 99.6 (a~ 13662' Datum MD = 13266' Datum TVDss= 8800' A-42A CTD Sidetrack SAFETY NOTES: 91° HORIZONTAL WELL ****WARNING: MUST TURN OFF RADIO TRANSMITTER IN W FATHER MONITORING SHACK BEFORE ANY W ELLW ORK INVOLVING EXPLOSIVES BEGINS. CONTACT PAD OPER. TBG CRIMPED WHILE RUNNING COMPLETION @ 9457 wlm. ID OF PIPE THIS DEPTH HASN'T BEEN DETERMINED YET. 2197' 1~4-1/2" HES HXO SSSV, ID = 3.813" 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" I~ 3124' GAS LIFT MANDRELS Minimum ID = 2.80" @ 13,110' X/Over Sub, 3-3/16" TCII Pin ID ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3007 2998 7 CAMCO DOME BK 16 11/08/04 3 6350 5286 58 CAMCO DOME BK 16 11/08/04 2 10185 7281 59 CAMCO DOME BK 16 11/08/04 1 12818 8619 59 CAMCO SO BK 20 10/02/05 12927' ~4-1/2" HES X NIP, ID = 3.813" I 12937' 7" X 4-1/2" TNV HBBP-T PKR, ID = 3.917" 12961' 4-1/2" HES X NIP, ID = 3.813" Top of Cemen! 12837' i 2937' TOP OF 3-1i2" x 3 3/16" LNR 12972' 4-1/2" HES XN NIP, ID = 3.725" - 12973' ~ .- ;_. Nip 2.813" ID 4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 12983' 12983' 4-1/2" WLEG 7-5/8" CSG, 29.7#, L-80, ID = 6.875" I~ 13195' REF LOG: MGR-CCL 03/23/07 ANGLE AT TOP PERF: 98' @ 13688' Note: Refer to Production DB for historical pe°~ `~. , SIZE SPF INTERVAL OPN/SO 2" ~ 13688' - 13828' OPN 2" ~ i 3848' 13908' OPPJ 2" fi ' 4028' 14068' ~ )PN I4-1/2" SLOTTED LNR, L-80, ID = 3.845" ~ 13927' PBTD 13927' 12967' ELMD TT LOGGED 03/25/95 1 TNV SS HIGH A NGLE HGR/PKR, ID = 4.000" PBTD I~ 14070' 3-3/16" cmt'ed and perled 1- 13208' Mechanical Whipstock 14110' 13927' --ITNV PACK OFF, ID = 2.61" 13960' TNV GUIDE SHOE DATE REV BY COMMENTS DATE REV BY COMMENTS 21411995 ORIGINAL COMPLETION 11/20/05 EZUPJC WANER SFTY NOTE DELETED 05/21/01 RNITP CORRECTIONS >rnm c' :: cc;'. a~:h 11/10/02 ATD/tlh WANERSAFEfY NOTE 11/08/04 JAF/TLP GLV GO 10/02/05 DAVlrLH GLV GO 10/09/05 DAV/PAG GLV CORRECTIONS PRUDHOE BAY UNrf WELL: A-42A PERMff No: 2 06- ~ 30' API No: 50-029-22542-01 SEC 35, T11N, R13E BP Exploration (Alaska) ?,~ "~ ;1 '~~ ~ ~ ! I ~ ;y~ ~ ti ',) ~ 1 ~ { ~-" "~ f ~; a a ~'~a~ FRANK H. MURKOWSKI, GOVERNOR >' ~~ O~ ~ ~-7 '~ 333 W. T" AVENUE, SUITE 100 C011TSI:RQ11TI01`T COrIIrII5SIOI~T y ANCHORAGE, ALASKA 99501-3539 s PHONE (907) 279-1433 Garret Staudinger FAx (so7) 27s-7x42 CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU A-42A BP Exploration (Alaska) Inc. Permit No: 206-130 Surface Location: 2263' FSL, 1703' FEL, SEC. 35, T11N, R13E, UM Bottomhole Location: 224' FNL, 1415' FEL, SEC. 11, T10N, R13E, UM Dear Mr. Staudinger: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (90759-3607 (pager). DATED this~ay of September, 2006 cc: Department of Fish & Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMIS N PERMIT TO DRILL 20 AAC 25.005 REG~E`(~CCM1`°°o CEP 4 S 200e ons. Commission 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if w ~ i propo t89@ ^ Coalbed Methane ^~~ydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU A-42A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14075 TVD 8922ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 2263' FSL 1703' FEL SEC 35 T11N R13E UM 7. Property Designation: ADL 047472 Pool , , . , , , Top of Productive Horizon: 686' FNL, 1736' FEL, SEC. 11, T10N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: November 20, 2006 Total Depth: 224' FNL, 1415' FEL, SEC. 11, T10N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 9800' 4b. Location of Well (State Base Plane Coordinates): Surface: x-653705 y-5947415 Zone-ASP4 10. KB Elevation (Height above GL): 85.5 feet 15. Distance to Nearest Well Within Pool: 1030' 16. Deviated Wells: Kickoff Depth: 13270 feet Maximum Hole An le: 99 de rees 17. Maximum Anticipated Pressures in prig (see 20 AA 35) Downhole: 3200 Surface: 320 18 Casin P `ram: S 'catio ns To -Settin De th -Bo ttom ua t' .of nt c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" 3-3/16" 6.2# L-80 TCII / STL 1110' 12965' 8742' 14075' 8922' 58 sx Class 'G' 1 g. PRESE NT WELL CONDITION SUMMARY (To `be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 13960 Total Depth TVD (ft): 9062 Plugs (measured): 13927 Effective Depth MD (ft): 13927 Effective Depth TVD (ft): 9058 Junk (measured): None Casing Length Size Cement Volume MD' TVD Conductor /Structural 110' 20" 260 sx Arcticset A rox. 110' 110' Surface 3089' 10-3/4" 970 sx Coldset III 375 sx Class'G' 3124' 3114' Intermediate 13163' 7-5l8" 265 sx Class 'G' 13195' 8946' Prod tion Liner 880' 4-1/2" Uncemented Slotted Liner 13080' - 13960' 8887' - 9062' Perforation Depth MD (ft): 13169' - 13927' Perforation Depth TVD (ft): 8933' - 9058' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Garret Staudinger, 564-4242 Printed Name Garret Staudinger Title CT Drilling Engineer Prepared By Name/Number: Si nature Phone 564-4242 Date ~*~ Terrie Hubble, 564-4628 .Commission Use Onl Permit To Drill Number: ri API Number: 50-029-22542-01-00 Permit A royal See cover letter for Dater other re uirements Conditions of Approval If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydra or gas contained shales: Samples Req'd: ^ Yes~;No Mud Log Req'd: ^ Yes,,~No HZS Measures: No D~ e ~ nal Survey Req'd:~Yes ^ No Other: ~ ~2 St ~D(~E '~0 3s~o ~/JLc,' . APPROVED BY THE COMMISSION a e ~~~ ~ ,COMMISSIONER Form 10-401 Revised 12/2005 ~ 1 ~ ~~ ~ V ~ ~,, Submit In Duplicate O + a~ • BP Prudhoe Bay A-42A CTD Sidetra~ CTD Sidetrack Summary Pre-Rig Work 1) S Caliper liner and tubing 2) S Dummy GLV. 3) S Run dummy whipstock drift 4) O MIT-IA, and OA. 5) O AC-PPPOT-IC, T 6) E Set 4-1/2" Baker Monobore WS at 13270' 7) C Down squeeze past whipstock, 15.8 ppg cement for abandonment -14 bbls 8) O Bleed gas lift and production flowlines down to zero and blind flange ~ 9) O Remove wellhouse, level pad ~. The pre CTD work is slated to begin about October 1, 2006 pendin sg_undry and permit. ~I ~ Rig Work: ./ 1) MIRU Nordic 1 and test BOPE to 250psi low and 0 si high. 2) Mi113.80" window at 13270' and 10' of rathole in ublik "B". ~ 3) Dri11805' sidetrack into Zone 4B target with resistivity to a TD of 14075'. ~ 4) Run solid 3 3/16" liner, cement, and test liner lap to 2000psi. 5) Cleanout liner and perforate for production 0500 ft of perfs). ~ 6) Freeze protect well and RDMO. Post-Rig Work / v. 1) Install well house, flow line and gas lift valves. ~-' Mud Program: • Well kill: 8.5 pp rine ~~ • Milling/drillin 8.6 ~~ig Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal _/ • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole Size: • 4 1/8" Casing Program: Fully cemented liner • 3 3/16", 6.2#, TCII or STL 12965'MD -14075'MD • A minimum o 12 bls 15.8 ppg cement will be used for liner cementing. Well Control: BOP diagram is attached. Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. ~ The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 99 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 9800 ft. • Distance to nearest well within pool - 1030 ft. (A-38) Logging • MWD directional and Gamma Ray will be run over all of the open hole section. Resistivity will be added for the lateral section of the hole. Hazards • • • The maximum recorded H2S level on A Pad " 200 m (A-43 on 01/13/06). The latest H2S on A-43 was 90 ppm. • Lost circulation risk is moderate (due to P&A of existing slotted liner prior to sidetrack operations). Reservoir Pressure Res. press. is estimated to be 3200 psi at 8800'TVDss (7.0 ppg EMW)/ Max. surface pressure with gas (0.10 psi/ft) to surface is 2320 psi. LHEAD= McEVOY CTLIATOR= BAKER KB. ELEV = 85.5' BF. ELEV = 54.67' KOP = 3200' Max Ang~ _ .8 ~ 13795' Detum MD = 13266' DatumNDss= 8800' A-02 I 10.3/4" CSG, 45.5#, NT-80, ID = 9.953" H 3 Minimum ID = 2.61" @ 13927' TIW PACK OFF SAFETY NOTES: 91 ° HORIZONTAL W ELL *'""WARNING: MUST TURN OFF RADIO TRANSMITTB2 IN W EATHEft MONITORING SHACK BEFORE ANY W ELLWORK INVOLVING EXPLOSNES BEGINS. CONTACT PAD OPER TBG CRIMPED WHILE RUNNING COMPLETION ~ 9457' wlm. ID OF PIPE ~ THIS DEPTH HASMT BEEN DETERMINED YET. 2197' H4-1/2" HES HXO SSSV, ID= 3.813" GAS LFT MANDRFIS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3007 2998 7 CAMCO DOME BK 18 11/08/04 6350 5288 58 CAMCO DOME BK 16 11/08/04 2 10185 7281 59 CAMu4 DOME BK 18 11/08!04 1 12818 8619 59 CAMCO SO BK 20 10/02/05 12927' H 4-1 /2" HES X N~, ID = 3.813" 12937' 7" X 4-1/2" TM/ HBBRT PKR, ~ = 3.91 12961' 4-1 /2" HES X NIP, ID = 3.813" ~ 4-1 /2" HES XN NIP, ID = 3.725" ~ 114-1l2" TBG, 12.8#, L-80, .0152 bpf, ID = 3.958" I-{ 1 7-5/8" CSG, 29.7#, L-80, ID = 8.875" ~ 131195' ~""; ~"`"~ i ~ i ' ~. ~~ , 4-1/2" SLOTTEOLNR, L-80, ~=3.845"~ 13927' _ / ~~ 1392r -~ 12983' -~a-1/2" wLEG ~ 12967' ELMD TT LOGGm 03/25/95 ~ TNV SS HIGH A NGLE HGRlPKR, ID = 4.000" ~ 1392r ~TM/ PACK OFF, ID = 2.61" 13960' TIW GUDE SHOE GATE REV BY COMMBYfS DATE REV BY COM1MB~lTS 1!4/1995 ORI(a~NAL COMPLETION 11/20/05 EZUPJC WANERSFTY NOTEDELEIID 05!21101 RN/TP CORRECTIONS 11/10/02 ATD/t~ WAN62 SAFETY NOTE 11/08/04 JAF/TLP GLV GO 10/02/05 DAVRLH GLV C!O 10/09/05 DWV/PAG GLV (X)RRH;fIONS PRUDHOE BAY IAVIT W~L: A-42 PB~ulff No:'1950020 API No: 50-02&22542-00 SEC 35, T11 N, R13E BP 6cploration (Alaska) 4" r~EVOY ~ A -4 2 A D= McEVOY )R= BAKER = 85.5' Proposed CTD Si. = 5a.sr 3200' 3 = .8 ®13795' I = 13266' SAFETY NOTES: 91°HORIZONTALWELL ••'"WARNING: MUST TURN OFF RADIO TRANSMITTHt IN W FATHER MONITORING SHACK BEFORE ANY W ELLW ORK INVOLVING EXPLOSNES BEGINS. CONTACT PAD OPER TBG CRIMPm WHILE RUNNING COMPLETION ~ 9457' wlm. ID OF PIPE ~ THIS DEPTH HASN'T BEETI DETERMIN®YET. I O 2197' 4-1/2" HES HXO SSSV, D = 3.813" GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3007 2998 7 CAMCO DOME BK 16 11/08/04 6350 5286 58 G~MCO DOME BK 16 11/08/04 2 10185 7281 59 G~1MC0 DOME BK 16 11/08/04 1 12818 8619 59 CAMCO SO BK 20 10/02/05 12927' H4-1/2" HES X NIP, ID = 3.813" I 12937' H 7" X 4-1 /2" TNV HBBRT PKR, ID = Top of Cement 12965' 12961' -14-1 /2" HES X NIP, ID = 3.813" 12965' 1 2975' TOP OF 3-3/16" LNR 3 5" XN Nip 2.75" ID 17477' ~ d-1 /2" HFS XN NIP D = 3 725" 11 4-1l2" TBG, 12.8#, L-80, .0152 bpf, D = 3.958" I 12983' 4-1/2" WLEG 12~6~ ELMD TT LOGGm 03/25/95 0= 3-3/16" cml'ed 4-1/2" SLOTTED LNR, L-80, ID = 3.845" 13927' PBTD 13927' DATE REV BY COMMENTS DATE REV BY COMMENTS 2/4H995 ORIGINAL COMPLETION 11/20/05 EZUPJC WANERSFTY NOTEDELET® 05/21/01 RNRP CORRECTIONS 11/10/02 ATDftIh WANER SAFETY NOTE 11/08/04 JAF/TLP GLV GO 10/02/05 DAV/TLH GLV GO 10/09/05 DAV/PAG GLV (~RRBCTIONS ~ TNV PACK OFF, ID = 2.81" I PRUDFIOE BAY UNR WELL: A-42 PffiMIT No: '1950020 API No: 50-029-22542-00 SEC 35, T11 N, R13E BP Exploration (Alaska) • • by BP Alaska s Baker Hughes INTEQ Planning Report 1NTE Q ' Companyc BP Amoco Date: 7/26/2006 Tiote: 10:35:44 Page: 1 Fiehi: Prudhoe Bay Ca-ordmafe(NE) Reference: Welt: A-42, Tnie North 'Site: PB A Pad Vertical (TVD) Reference: 48 :421110/1995 00:00 85.5 Well: A-42 Section (VS)Referencei Well (O.OON,O.OOE,38.OOAzi) Wellpatb: Plan 1, A-42A Snrvey Cakalation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB A Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5946131. 57 ft Latitude: 70 15 35.209 N Froro: Map Eastiog: 653509.42 ft Longitude: 148 45 32.775 W Position Uncertainty: 0.00 ft North Reference: True Ground Levei: 0.00 ft Grid Convergence: 1.17 deg Weil: A-42 Slot Name: 42 A-42 Well Position: +N/-S 1279.63 ft Northing: 5947415. 35 ft Latitude: 70 15 47.794 N +E/-W 221.38 ft Easting : 653704. 66 ft Longitude: 148 45 26.332 W Position Uncertainty: 0.00 ft Welipath: Plan 1, A-42A Drilled From: A-42PB2 Tie-on Depth: 13255.56 ft Current Datum: 48:42 1!10/1995 00 :00 Height 85. 50 ft Above System Datum: Mean Sea Level Magnetic Data: 7/25/2006 Declination: 24.41 deg Field Strength: 57600 nT Mag Dip Angle: 80.86 deg Vertical Section: Depth From (TVD) +N/-S +E/-W DireMion ft ft ft deg 38.50 0.00 0.00 38.00 Pian: Plan #1 Date Composed: 7!25/2006 copy Lamar's Plan 1,Ties to A-42PB2 at 13255.56'MD Version: 3 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <-- Latitnde ---> <-- Longitude -> Name Description TVD +N/-S +E!-W Northing Easting Deg Mm Sec Deg Min. ' Sec Dip. Dir. ft ft ft ft ft A-42A Polygon 85.50 -7713.10 518.04 5939715.00 654380.00 70 14 31.936 N 148 45 11.271 W -Polygon 1 85.50 -7713.10 518.04 5939715.00 654380.00 70 14 31.936 N 148 45 11.271 W -Polygon 2 85.50 -7685.02 171.52 5939736.00 654033.00 70 14 32.212 N 148 45 21.345 W -Polygon 3 85.50 -7960.21 127.89 5939460.00 653995.00 70 14 29.506 N 148 45 22.614 W -Polygon 4 85.50 -8252.70 49.90 5939166.00 653923.00 70 14 26.629 N 148 45 24.881 W -Polygon 5 85.50 -8267.17 464.72 5939160.00 654338.00 70 14 26.487 N 148 45 12.823 W A-42A Fault 1 85.50 -7781.61 -486.64 5939626.00 653377.00 70 14 31.262 N 148 45 40.479 W -Polygon 1 85.50 -7781.61 -486.64 5939626.00 653377.00 70 14 31.262 N 148 45 40.479 W -Polygon 2 85.50 -7616.39 -54.14 5939800.00 653806.00 70 14 32.887 N 148 45 27.906 W -Polygon 3 85.50 -7339.44 392.64 5940086.00 654247.00 70 14 35.611 N 148 45 14.917 W -Polygon 4 85.50 -7616.39 -54.14 5939800.00 653806.00 70 14 32.887 N 148 45 27.906 W A-42A Fault 2 85.50 -7184.51 -630.49 5940220.00 653221.00 70 14 37.134 N 148 45 44.662 W -Polygon 1 85.50 -7184.51 -630.49 5940220.00 653221.00 70 14 37.134 N 148 45 44.662 W -Polygon 2 85.50 -7208.22 -252.87 5940204.00 653599.00 70 14 36.901 N 148 45 33.683 W -Polygon 3 85.50 -7322.99 272.94 5940100.00 654127.00 70 14 35.773 N 148 45 18.397 W -Polygon 4 85.50 -7366.74 799.19 5940067.00 654654.00 70 14 35.342 N 148 45 3.097 W A-42A Fault 3 85.50 -8281.44 -305.79 5939130.00 653568.00 70 14 26.346 N 148 45 35.221 W -Polygon 1 85.50 -8281.44 -305.79 5939130.00 653568.00 70 14 26.346 N 148 45 35.221 W -Polygon 2 85.50 -8747.28 71.81 5938672.00 653955.00 70 14 21.765 N 148 45 24.244 W -Polygon 3 85.50 -9071.90 440.29 5938355.00 654330.00 70 14 18.572 N 148 45 13.534 W -Polygon 4 85.50 -8747.28 71.81 5938672.00 653955.00 70 14 21.765 N 148 45 24.244 W A-42A Target 2 9009.50 -7773.50 291.75 5939650.00 654155.00 70 14 31.342 N 148 45 17.850 W A-42A Target 1 9075.50 -8176.50 188.49 5939245.00 654060.00 70 14 27.378 N 148 45 20.852 W • • ~'.r by BP Alaska ~ Baker Hughes INTEQ Planning Report INTEQ Compaoyc, BP Amoco Date: 7/26/2006 Time: 10 :35:44 Page: 2 Field: Prudhoe Bay Co-ordioate(NE} Reference: Well: A-42, True North Site: PB A Pad Vertical (TVD} Reference: 48:4 2 1 /10/1 995 00:00 85. 5 Wetl: A-42 Section (VS) Reference: Weli ( O.OON,O .OOE,38.OOAz i) Wellpatb: Plane 1, A-42A Survey Calenlatio® Metbud: Minimum Curvature Db: Oracle Targets Map Map <-- Latitade' -~ <- Longit ude --> Name Description TVD +NhS +Ef-W Northing Eastin~ Deg Min Sec Deg Min Sec Dip. Dir, ft ft ft ft ft Annotation MD TVD ft ft 13255.56 8967.98 TIP 13270.00 8972.17 KOP 13290.00 8978.22 End of 9 Deg/100' DLS 13320.00 8990.24 4 13571.96 9073.52 5 13646.96 9068.88 End of 40 Deg/100' DLS 14075.00 0.00 TD Plan Section Information MD Incl Azim - TVD +N/-5 +E/-W DLS Build. Turn TFO Target ft deg deg ft ft ft deg/1OOft deg/100ft deg/100ft deg 13255.56 72.90 175.90 8967.98 -8072.87 -39.16 0.00 0.00 0.00 0.00 13270.00 73.30 175.85 8972.17 -8086.65 -38.16 2.79 2.77 -0.35 353.17 13290.00 71.50 175.85 8978.22 -8105.66 -36.78 9.00 -9.00 0.00 180.00 13320.00 61.24 169.04 8990.24 -8132.86 -33.24 40.00 -34.20 -22.70 210.00 13571.96 90.00 66.72 9073.52 -8213.41 154.61 40.00 11.41 -40.61 264.00 13646.96 96.95 37.46 9068.88 -8168.00 213.04 40.00 9.26 -39.01 284.00 14075.00 98.46 345.61 9007.32 -7767.09 295.23 12.00 0.35 -12.11 275.30 Survey MD Incl Azim Sys TVD N/S E/W MapN MapE DLS VS TFO Toole R deg deg: ft ft ft ft ft deg/100ft ft deg 13255.56 72.90 175.90 8882.48 -8072.87 -39.16 5939343.96 653830.30 0.00 -6385.61 0.00 MWD 13270.00 73.30 175.85 8886.67 -8086.65 -38.16 5939330.20 653831.58 2.79 -6395.86 353.17 MWD 13290.00 71.50 175.85 8892.72 -8105.66 -36.78 5939311.23 653833.35 9.00 -6409.99 180.00 MWD 13300.00 68.05 173.69 8896.18 -8115.00 -35.93 5939301.90 653834.39 40.00 -6416.83 210.00 MWD 13310.00 64.63 171.43 8900.19 -8124.08 -34.75 5939292.85 653835.76 40.00 -6423.26 210.75 MWD 13320.00 61.24 169.04 8904.74 -8132.86 -33.24 5939284.11 653837.44 40.00 -6429.24 211.65 MWD 13330.00 60.90 164.49 8909.58 -8141.37 -31.24 5939275.63 653839.62 40.00 -6434.72 264.00 MWD 13340.00 60.71 159.91 8914.46 -8149.68 -28.57 5939267.38 653842.45 40.00 -6439.63 266.20 MWD 13350.00 60.68 155.32 8919.36 -8157.74 -25.25 5939259.39 653845.94 40.00 -6443.93 268.44 MWD 13359.50 60.80 150.97 8924.00 -8165.13 -21.51 5939252.08 653849.83 40.00 -6447.45 270.68 A-42A 13360.00 60.81 150.74 8924.25 -8165.51 -21.29 5939251.70 653850.05 40.00 -6447.62 272.81 MWD 13370.00 61.09 146.17 8929.10 -8172.96 -16.72 5939244.35 653854.77 40.00 -6450.68 272.92 MWD 13380.00 61.52 141.64 8933.91 -8180.05 -11.56 5939237.37 653860.08 40.00 -6453.08 275.14 MWD 13390.00 62.11 137.15 8938.63 -8186.74 -5.82 5939230.80 653865.95 40.00 -6454.82 277.32 MWD 13400.00 62.83 132.71 8943.26 -8193.00 0.46 5939224.67 653872.36 40.00 -6455.89 279.44 MWD 13410.00 63.70 128.34 8947.76 -8198.80 7.24 5939219.01 653879.26 40.00 -6456.28 281.49 MWD 13420.00 64.69 124.04 8952.11 -8204.11 14.51 5939213.85 653886.63 40.00 -6456.00 283.46 MVND 13430.00 65.81 119.81 8956.30 -8208.91 22.21 5939209.21 653894.43 40.00 -6455.03 285.33 MWD 13440.00 67.04 115.66 8960.30 -8213.17 30.32 5939205.11 653902.63 40.00 -6453.40 287.10 MWD 13450.00 68.38 111.58 8964.09 -8216.88 38.80 5939201.58 653911.18 40.00 -6451.10 288.77 MWD 13460.00 69.82 107.59 8967.66 -8220.00 47.60 5939198.63 653920.04 40.00 -6448.15 290.31 MWD 13470.00 71.34 103.66 8970.99 -8222.54 56.68 5939196.28 653929.17 40.00 -6444.56 291,74 MWD 13480.00 72.95 99.81 8974.05 -8224.48 66.00 5939194.54 653938.52 40.00 -6440.34 293.04 MWD 13490.00 74.62 96.03 8976.85 -8225.80 75.51 5939193.41 653948.05 40.00 -6435.53 294.22 MWD 13500.00 76.36 92.31 8979.35 -8226.50 85.16 5939192.91 653857.72 40.00 -6430.14 295.28 MWD 13510.00 78.15 88.64 8981.56 -8226.58 94.91 5939193.03 653967.47 40.00 -6424.20 296.21 MWD 13520.00 79.99 85.03 8983.46 -8226.04 104.71 5939193.77 653977.26 40.00 -6417.74 297.02 MWD 13530.00 81.87 81.45 8985.03 -8224.88 114.52 5939195.13 653987.03 40.00 -6410.79 297.71 MWD by BP Alaska r Baker Hughes INTEQ Planning Report INTE Q Corepnny BP Amoco Date: 7/26/2006 Tiroe: 10:35`.44 Page: 3 >•.eld: Prudhoe Bay Go-ordinate(NE) Reference: Well: A-42, True North Site: PB A Pad Vertieal (1'VD) Reference: ' 48 ; 42 1/10/199500:00 85.5 Wep: A-42 ' Section (VS) Reference: Well (O.OON,O.OOE,38;OOAzi) Wellpath: Plan 1, A-42A Survey Calc®Iatiou Method: Minimum Curvature Db: t3raGe Survey MD Incl Azim Sys TVD N/S E/W ft deg deg ft ft ft 13540.00 83.78 77.91 8986.28 -8223.10 124.27 13550.00 85.71 74.39 8987.20 -8220.71 133.94 13560.00 87.66 70.89 8987.78 -8217.73 143.47 13570.00 89.62 67.40 8988,02 -8214.18 152.81 13571.96 90.00 66.72 8988.02 -8213.41 154.61 13580.00 90.78 63.60 8987.97 -8210.03 161.91 13590.00 91.74 59.71 8987.75 -8205.29 170.70 13600.00 92.70 55.83 8987.36 -8199.96 179.15 13610.00 93.64 51.93 8986.81 -8194.08 187.22 13620.00 94.57 48.03 8986.09 -8187.66 194.86 13630.00 95.47 44.12 8985.22 -8180.75 202.03 13640.00 96.35 40.20 8984.19 -8173.38 208.70 13646.96 96.95 37.46 8983.38 -8168.00 213.04 13650.00 96.98 37.09 8983.01 -8165.60 214.87 13675.00 97.25 34.08 8979.91 -8145.43 229.30 13700.00 97.49 31.07 8976.71 -8124.53 242.65 13725.00 97.72 28.05 8973.40 -8102.98 254.87 13750.00 97.92 25.03 8970.00 -8080.83 265.94 13775.00 98.10 22.00 8966.51 -8058.13 275.81 13800.00 98.26 18.98 8962.95 -8034.95 284.47 13825.00 98.40 15.95 8959.33 -8011.36 291.90 13850.00 98.51 12.92 8955.65 -7987.41 298.06 13875.00 98.60 9.88 8951.93 -7963.18 302.94 13900.00 98.67 6.85 8948.18 -7938.73 306.54 13925.00 98.71 3.82 8944.40 -7914.13 308.84 13950.00 98.73 0.78 8940.61 -7889.44 309.83 13975.00 98.72 357.75 8936.82 -7864.74 309.51 14000.00 98.69 354.71 8933.03 -7840.08 307.89 14025.00 98.64 351.68 8829.26 -7815.54 304.96 14050.00 ,98.56 348.64 8925.52 -7791.19 300.73 14075.00 / 98.46 345.61 8921.82 -7767.09 295.23 MapN MapE I)LS VS TFO Tool ft ft degN OOft ft deg 5939197.11 653996.75 40.00 -6403.38 298.27 MWD 5939199.69 654006.37 40.00 -6395.55 298.72 MWD 5939202.86 654015.83 40.00 -6387.34 299.04 MWD 5939206.61 654025.10 40.00 -6378.78 299.24 MWD 5939207.41 654026.88 40.00 -6377.07 299.32 MWD 5939210.94 654034.11 40.00 -6369.92 284.00 MWD 5939215.86 654042.81 40.00 -6360.76 283.98 MWD 5939221.36 654051.15 40.00 -6351.36 283.89 MWD 5939227.41 654059.09 40.00 -6341.76 283.74 MWD 5939233.97 654066.59 40.00 -6332.00 283.53 MWD 5939241.03 654073.62 40.00 -6322.14 283.25 MWD 5939248.53 654080.15 40.00 -6312.22 282.91 MWD 5939254.00 654084.37 40.00 -6305.31 282.50 MWD 5939256.44 654086.15 12.00 -6302.29 275.30 MWD 5939276.90 654100.17 12.00 -6277.51 275.26 MWD 5939298.06 654113.08 12.00 -6252.83 274.88 MWD 5939319.86 654124.86 12.00 -6228.32 274.50 MWD 5939342.23 654135.47 12.00 -6204.05 274.10 MWD 5939365.12 654144.88 12.00 -6180.09 273.69 MWD 5939388.47 654153.07 12.00 -6156.49 273.26 MWD 5939412.21 654160.01 12.00 -6133.33 272.83 MWD 5939436.27 654165.68 12.00 -6110.67 272.39 MWD 5939460.60 654170.07 12.00 -6088.56 271.95 MWD 5939485.11 654173.16 12.00 -6067.08 271.50 MWD 5939509.76 654174.96 12.00 -6046.28 271.04 MWD 5939534.46 654175.45 12.00 -6026.21 270.58 MWD 5939559.15 654174.62 12.00 -6006.94 270.12 MWD 5939583.77 654172.50 12.00 -5988.51 269.66 MWD 5939608.24 654169.07 12.00 -5970.98 269.20 MWD 5939632.49 654164.35 12.00 -5954.39 268.75 MWD 5939656.47 654158.35 12.00 -5938.79 268.29 2-7/8" • • Q R 1 7 FI a -il~Ti I ~ li }# 11111 ll k I kl I'rr ~1lI 1 I! t 'I G ; il~i F ~ r } 1~ ~ ~ f }:~ }~ s ~ _ _ _ # ii~t 7t~t tt F# ttEt i-(~f Irr r `7 ~ I f r ' ~ ~, ~' t k ( I + ~ ' ~i 7 i 1 .~~ ~~a~ ~ t~~-~r trC jf~,~t~t>-~~,' ~~~~ It f~' ~:"Fri ~ ' ,r I ~ti, t t II,t. II II t I j f r 9 11ia ~~, ifs; Nrl 1r.1 tu{ ~~' ~ ~ I r f.~•. 1'' $ !# # k.- , '~ ~ f_ t r„ *++ I r r I ~ a ~ }t~r . ,> ~'~ r +~ ~r, a 1 11 r~l'tE.; f ~~! + ~ '',' t! l i ~r ` i '~ ~~ t # } .+ } .. i b I!~ll iC. ~il~ ~Lt~ '~r~ SSii ]ii~rlil( 1}ti ~~I{ ~i E ~ ~ I~'l 'I + '} #~1 i ~l- ! t 3 '~ _ 1 ~ ~'j#I rI~ ~.~( ~ ~ t ~~ 1t~ Ii r i II. Via; s~~ Fill ;l ~. '. ~~~~ $ ~:~ I ~~ ~~~. ~~~~ ~F`1r- ~ ~ ~ _.~ ys b~ d~ 1f _. r ~ li.i1 { l,~ll ~, ;i~~ ~ $ ~# l ~ -~~1 ~. I e~ ~ ~1 f i I l l t~ I i I i ~ i' i. f i t~l- I I r ~~~o=$ ~~!at j (lrl~t+ 11+i t. :~f ~ ~ ~~~k1-#~t1~.-t. ~ ~. ~ _ ~i „r,~I 4 ~It 1 -- ~ r ~ r ~ ~ iTa t R $ 4 .i# ~ iK r !, It ~_~ I _ . s ~ ~ ~iil- {tai `•Lt E~ ~- l44 ~ I 5 lr~ fl~~ i ~ ~ F~ ~ ~ a i ' __ ~ t j:. it ' ------ }i~ t -- - ~4 _~ _ ... ;,. . { ,, g .. t _ g R t~ _ ,ii ~ i _ I ~e ~ I. ~ . + i. ~ ~ ~~~ n l~(I i,i ;}i; l 11,1 i ~ J , ~ .~} ~ Iq w I r l tt~titl l~li II}t ~ ' j I {r I ~ ~~ {1 I $e i..j. ~~''r I I~.I ai+~_+tl tr'r-' I'' ~ ~I_~~t ~#'--f t ,_ ~ 19i ~ ~1 rl t;# fi,~ ril} I t ICI:: ~I " ~ I~{ f f}l ~ ~~ ' a7: j + 1 a ~.'1 i_ 1~;:. ++~;• ;, I!I_ 1- VIII t1-~+. ~ - 44'tii IE k ~W i f' . li~+l Iil~lill {(ij II{ Ij' ~fl' I~kt~' ~ I I~i1 }; G; t~ ~ #trr)~,r,~ ,tT 1 tt ~II # 1~ I ~ ~~~ t` ~ I ~ ~ ,I _ 1 I 1 ~t~ 1 1'i ~ ~I L I tt i i ~ ~ I' m ~ ~ t }~1~ ~ +.i: i;rt t{1{ i}fr jr'' ilrt :; (}~-` f-r I, ; ; ~ -1 +, .,Lip li! tlitll~Il[.1.Ili ltl;~itif Fitt ~k~~~..i-t- ~ ;: t ~ t ' .. [ I: t g hVUO911.Iwa~A•Iw^os ~ r- ~ I i '. I t. i z , I it ~ ~ I i ~ 1~~~;~ #t~ : ~ t t ~~ I + .\ f i ~ ~ ~ Sb9RRi 1 j (~ ::;:j~: : z aevo~i r . Fr . I t I ~ # #. ' ~ ~\ l~ i 1 : kE~ ' ~ ~~/~ ~ Y ~ ,ag ~~iiaa ~ i # ~{ ~1~1 ~ _ t ~~\ i I t f t! @ ~? ~ a0~~~ ~ i0„3iF iii III tai m ~ #~J ~~~ ~ 3,~8~ e~i~~SEe ~ ~ ~ ~ _~~: ~~} ~'~# Ili +_~ ~~I I~'~ I' '' ~ -~ i ' -`~a ccce~^i ~ ~ ; . II~ t Cf 11i; i.tr II ~~I,~~lil~~i; ~ ~~ - ; s999ss~ !~i..ie ~ ~ ~ ..ii ~ _ :999:~r~ i ~ ~~ .z. ~# ~~~~t~j ,~, ..~ ~ a $...~...~ ,.~, ..~ a .3, ..$ 8 ~ ~ t9w9u aw 1 ~~+•~...a by BP Alaska Anticollision Report ~.r INTEQ "Company: BP AmoCO Date: 7/26/2006 Time: 10:51:02 Page. 1 Field: Prudhoe Bay Refere®ee Site: PB A Pad Co-ordmate(NE) Reference: Well: A-42, True North Reference We1L A-42 Vertical (TVD) Referents 48 : 421!10!1995` 00; 00 85:5 Reference Wetipath: Plan 1, A-42A` Db: Orate GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 ofreference -There are 1ftEfi3i6oetils in thisRt+itdil pal Plan & PLANNED PROGRAM Interpolation Method: MD Inte rval: 100.00 ft Error Model: ISCWSA Ellipse Depth Range: 13270.00 to 14075.00 ft Scan Method: Trav Cylinder North Maximum Radius: 1500.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 7/25/2006 Validated: No Version: 0 Actaal From To Survey Toolcode Tool Name ft ft 100.00 5300.00 1 : Gyrodata gyrocompassing m/ GYD-GC-MS Gyrodata gyrocompassing m/s 5350.00 13149.27 2 : MWD -Standard (5350.00-13 MWD MWD -Standard 13175.00 13980.00 2 : MWD -Standard (13175.00-1 MWD MWD -Standard Casing Points MD TVD Diameter Hole Size Name ft' ft in _ in 14075.00 0.00 2.875 3.750 2-7/8" Summary w----------- Offset Wellpath ---> Reference Offset Ctr-Ctr' No-Go Allowable Site WeII Wellpath MD MD Distance Area Deviation Warning.. ft ft ft ft ft PB A Pad A-21 A-21 V1 Out of range PB A Pad A-38 A-38 V1 Out of range PB A Pad A-38 A-38L1 V4 Out of range PB A Pad A-38 A-38L1 P61 V2 Out of range PB A Pad A-38 A-38L2 V4 Out of range PB A Pad A-42 A-42 V1 13386.26 13400.00 36.04 335.59 -299.55 FAIL: Major Risk ~. PB A Pad A-42 A-42P81 V5 13384.70 13400.00 50.56 426.11 -375.54 FAIL: Major Risk PB A Pad A-42 A-42P62 VO 13386.26 13400.00 36.04 335.59 -299.55 FAIL: Major Risk PB X Pad X-35 X-35L1 V6 14043.80 15300.00 1211.16 373.84 837.32 Pass: Major Risk Site: PB A Pad We1L• A-42 Rule Assigued: Major Risk Wellpath: A-42 V1 Inter-Site Error: 0.00 ft ..Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TF0.HS Casinglflsflistanee Area Deviation Warnins ft ft ft ft ft ft deg deg in ft ft ft- 13299.92 8981.65 13300.00 8980.59 88.74 89.10 181.45 7.74 1.15 182.95 -181.80 FAIL 13386.26 9022.37 13400.00 9007.45 73.02 74.21 200.82 61.99 36.04 335.59 -299.55 FAIL 13436.81 9044.54 13500.00 9031.08 52.09 53.61 198.98 82.01 105.47 270.66 -165.19 FAIL 13463.32 9054.29 13600.00 9045.03 39.88 41.41 193.33 87.06 191.54 202.65 -11.11 FAIL 13478.68 9059.16 13700.00.9049.18 33.98 35.32 188.21 87.89 283.89 160.90 122.99 Pass 13488.81 9062.03 13800.00 9047.34 31.43 32.49 184.17 87.69 378.71 137.15 241.56 Pass 13497.68 9064.30 13900.00 9055.06 30.16 30.92 182.02 88.85 473.25 121.42 351.83 Pass 13502.14 9065.35 13960.00 9062.37 29.75 30.41 181.19 89.67 530.24 115.63 414.61 Pass Site: PB A Pad Well: A-42 Rule Assigned: Major Risk Wellpath: A-42P61 V5 Inter-Site Error: 0.00 ft Referenee Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TF0.HS Casing/ILSflistance Area Dtviation Warning ft ft ft ft ft ft deg deg in ft ft ft 13297.67 8980.82 13300.00 9002.05 88.79 89.68 337.10 162.90 23.82 254.57 -230.76 FAIL 13384.70 9021.64 13400.00 9056.78 73.55 75.19 281.59 142.07 50.56 426.11 -375.54 FAIL 13432.50 9042.82 13500.00 9111.73 54.09 55.93 249.29 130.53 115.99 362.89 -246.91 FAIL 13457.65 9052.34 13600.00 9166.63 42.38 44.33 236.08 127.56 200.19 287.18 -86.99 FAIL C by BP Alaska Anticollision Report • ri.r il>Es INTEQ Company; BP Amoco Date: 7!26/2006. Time: 10:51:02 Page: 2 Field:.... Prudhoe Bay Refcre®ce Site: PB A Pad Ca-ordinate(NE) Reference: WeII: A-42, True-North .Reference Well: A-42 Vertical (TVD) Reference: 4$ : 421 H0l1995`00: 00 85.5 Reference Wellpat6: Plane!, A-42A Db: Orate Site: PB A Pad Well: A-42 Rule Assigned: Major Risk Wellpath: A-42P62 VO Inter-Site Error: 0.00 ft -'Reference Offset Semi-MajorAais Ctr-Ctr No-Go Albwa6le MD TVD MD TVD Ref Offset TFO+AZI TFO.HS Casiag/HSflistance Area Deviation. . Warning ft R R- ft ft R deg deg in ft ft R 13299.92 8981.65 13300.00 8980.59 88.74 89.10 181.45 7.74 1.15 182.95 -181.80 FAIL 13386.26 9022.37 13400.00 9007.45 73.02 74.21 200.82 61.99 36.04 335.59 -299.55 FAIL 13436.81 9044.54 13500.00 9031.08 52.09 53.61 198.98 82.01 105.47 270.66 -165.19 FAIL 13463.32 9054.29 13600.00 9045.03 39.88 41.41 193.33 87.06 191.54 202.65 -11.11 FAIL 13478.71 9059.17 13700.00 9048.86 33.97 35.32 188.13 87.82 283.84 160.78 123.05 Pass 13488.90 9062.05 13800.00 9041.23 31.41 32.50 183.17 86.72 378.07 137.08 240.99 Pass 13496.96 9064.12 13900.00 9034.93 30.25 31.08 179.79 86.35 473.39 124.59 348.80 Pass 13502.45 9065.42 13980.00 9035.19 29.73 30.47 178.17 86.76 550.16 119.56 430.60 Pass Site: PB X Pad Well: X-35 Rule Assigned: Major Risk Wellpath: X-35L1 V6 Inter-Site Error: 0.00 ft ".Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVI) MD ' TVD Ref t~ffset TFO+AZ I TFO-HS CasiaglHSi)istance Area Deviation Warning R R ft R R R deg deg in ft ft R 13909.35 9032.27 14700.00 8961.60 89.85 21.67 93.61 87.89 2.875 1494.24 362.07 1132.17 Pass 13925.00 9029.90 14800.00 8966.65 90.26 22.08 91.99 88.17 2.875 1431.30 360.81 1070.49 Pass 13950.00 9026.11 14900.00 8967.78 90.71 22.81 88.91 88.13 2.875 1363.05 358.95 1004.10 Pass 13966.78 9023.56 15000.00 8971.01 90.87 23.53 87.13 88.39 2.875 1300.52 359.96 940.56 Pass 13989.77 9020.08 15100.00 8976.18 90.95 24.62 84.68 88.72 2.875 1249.94 362.56 887.39 Pass 14016.08 9016.10 15200.00 8977.40 90.83 26.13 81.70 88.94 2.875 1220.46 367.36 853.10 Pass 14043.80 9011.94 15300.00 8976.99 90.46 28.08 78.51 89.11 2.875 1211.16 373.84 837.32 Pass 14075.00 9007.32 15400.00 8971.68 89.75 30.60 74.62 89.00 2.875 1220.59 381.47 839.12 Pass • • Q ~ ~ o is ~ o o a j ~ ~ m N I p y . ~ g ~i °i n QQ ~ o °o m n m z _ c o _ f ^ X o U 0 S 1 A t kt ` ~ ~ 0 } ~~ ~ I o ~ . f 1i l :~ o~ rt.. ' s f~! ~~ i ~ ooh ~ ~, ~ E ~ ~ . ~ ~~ I s -`- ~( ~ r N ~ rt, ~_ ~ ~ 1 ` 1 ~ X 5~ i4 ~ x 'f~ t tl ~ O t t 3 ~ ' ~~ r r~ I i; ;~ I'III Ij (11~IIi I~a~t,tt~!s_I~~i~~~~~~II~ ~~;I(`-~+II ~ ~ ' S ~ o e m ~ ~ ~ e N Q e y 1r ~~ a ~ o ,W~ ~ « a a $ ~ '' 'R `+v' jai ;/ ~ ~ ~ ~ ~ ~ _- W _ _.. .-..-.-... ___ _____. ___.__. --.-. N ~ ` m ~ a I i !-, ~ a L a a i~ a If~ $; a i..~ - s 8r $ _ii'. -~' s: s ~ .a_~3 otxad.~ee "FC'd'a 3axi~is..~o. 7? \a raDi 1 I-r i + ~ ~{} ,~,~tl ~ F t ~-~ r a n >ax5~ . ao - ;Ff a ~ ~t ~~ ~ (t 1 ~ 1 4 } t ~ f : t is I'< I<.. II ..I: .I. .li 4lali4'la ~ a ~i'_Y{ $ {~_ {,il r' f r ~' {I1 I ~~ t E F M II t~ i.;-~{ I ~ I r. i a -+ 1II+} ~ F rf S ~' m ~ ~, r ~, ~•r t, t L~ ~~ a i ~ I fr~~~.. g -:aa::e m i ' ~~ I~ [L ~ art ~4t n $~ F h ~ ~ m ~ ~~~~a~~ ; f I' ; ~ ~ ~ ' ~-i ~ ~ j t . j I i t; r + ~ ~r~1 ~ ~~i -j' ~ °s 8SR8 fRR m ~ IttI C ~_.I i I I{ 1. ~ t ( ~ ~ r 2 0. ~ d~EF~AC < '.I ~~I f { - - j~ _~ r i #~4 !t r r,~ _ I { I ~.. ~. (Q ~ $ ~ 9~om~ ~ eai~#~'S.' I ~I~'~r I-~- ~{Xi- r_ ~1 ~.. { I '' i1 r f..~r~ ~ ~ ~~~. f{{ {..I~ -~ Y 1 3 R ¢ $~_= a :Ea ~I~~ ~~ 1K~1 ! f~ I ~-- "~_~ ~.ff f I ~ ~I-"iii R e ~ ^S -a f $ 0 3e o E i 3 ~t,'li~~t:~ :. i. k~ LI. ~ :F:$ ~ ...F f ~_~ i is i r -1_ F Q 3 ~ j~ ~_ ~' ! i i~aes $ ~'j ~~~~~ i '. ~' I{ r t~ f ~ '~~I 7 ~ { ~ ( ~ :il-~ gg ~ ~ ~s ~ 9iiit~ ~ t ~ } r } I t ` ~ - t r .3 d~ ~° LL f i m~ E==aaagR ~ ~~ t. , ~ f.~ f$ ~~ r r 1 ~1 ~_~ r E l e i ~~ m ~f ~~ ~~~ ~ zzhs~ ~ ~lis~Fi~ 1 ~-h ~, ~ ~ I. ~ 1~' ~ r. i '~ ~t ~I ~il~ r• `~ saaa^~- .. ~~ ~' eaa~u af3^~ rft BY ~~~ ~ I saa_Rff . ~ ~ ~ ' ^ I ~ ~... I t W%¢ rrr~~r - ~ n-t~F+rrrrrnm-~-r l-rr ,~ ~ ~. rrrtr rrr r. r. .., rr~ ~ '•""" I~IMOOLI ~l+)4i+owl-)4~oS are L N~_ L.L of bag Dowell of bag slips Blind/Shears pipes 2 3/8" combi ram/slips of flow cross Mud Cross of blind/shears variable bore pipe 3 1/2"-2 7/8" of pipe/slips 2 3/8" combi ram/slips b Valve Flow Tee • BAG TOTs Mud Cross TOTs • Terri Hubble BP Exploration AK Inc. PO Box 196612 MB 7-5 Anchorage, AK 99519 PAY TO THE ORDER OF "Mastercard Check" First National Bank Alaska Anchorage, AK 99501 MEMO ~__~, as-sn 252 300 DATE t/ ~/ w ~~ s /O~. dO ~:1 2 5 200060~:99L46227L556~~' 0300 • ~~~SM~TTA~. LE~Z'ER ~~ECKLIS~ WELL NANTE _~ ~ ~~,~ PTD# ~f-~'~r'5 Development Service Exploratory Stratigraphic Test Non-Conventional Vb'ell Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ~ ADD-ONS WHAT ~ (OPTIONS) APPLIES TEXT FOR APPROVAL LETTER 4 MULTI LATERAL ;The permit is for a new wellbore segment of existing well ~ (If [ast two digits in ~ ~ ~ Permit No. , API No. 50- i API number are ~ - - ~ ~ I between 60-69) j Production should continue to be reported as a function of the j I original API number stated above. ' PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs j ac uired for the ilot hole must be ~ q p clearly differentiated in both , j well name ( PH) and API number ~ I (50- - -_) from records, data and logs ~ j ~ acquired for well _ ~ SPACING ,EXCEPTION I i I The permit is approved subject to full compliance with 20 AAC ~ 25.0». Approval to perforate and produce !infect is contingent !upon issuance of a conservation order approving a spacing ~ exception. assumes the I liability of any protest to the spacing exception that may occur. i j I~I DRY DITCH + I A11 dry ditch sample sets submitted to the Commission must be in ' f SAMPLE no greater than 30 sample intervals from below the permafrost or j ~ from where samples are first caught and 10' sample intervals j I ~ through target zones. jNon-Conventional j Please note the following special condition of this permit: , j production or production testing of coal bed methane is not allowed We(1 i for (name of well) until after jCom~anv Name) has designed and implemented a water well testing program to provide baseline data ~ on water quality and quantity. ~Com anv Name} must contact the ~ Commission to obtain advance approval of such water well testing ~ Rev: 1I2~/06 C:`jodyltransmittal checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ PTD#:2061300 Company BP EXPLORATION~ALASKA)JNC ____ __ ___ ___ InitialClasslType _ _ .Well Name: PRUDHOE BAY.UNIT A-42A _ Program DEV ___ Well bore seg J _DEV/1-Oll. GeoArea 890- Unit 11650 OnlOffShore On Annular Disposal ',_'~ Administration ! 1 Permit fee attached Yes 2 Lease number appropriate. Yes 1,3 Unique well name and number Yes ',4 Well located in a-defined pool Yes ',5 Well located proper distance from drilling unit boundary Yes 16 Well located proper distance-from other wells- Yes 17 Sufficient acreage available in drilling unit Yes - - - 8 If deviated, is wellbore plat included Yes j9 Operator only affected party Yes 10 Operator has-appropriate-bond in force. - Yes '11 Permit can be issued withcut conservation order - - - Yes ',12 Permit can be issued without administrative-approval - _ - - _ _ _ Yes Appr Date X113 Can permit be approved before 15-daywait- Yes RPC 9/11/2006 '14 Well located within area and strata authorized by Injection Order # (put 10# ncomments)-(For- NA 15 All wells within 114. mile area of review identified (For service_well only) NA 16 Pre-produced injector: duration ofpre-production less than_ 3 months (For service well. only) - NA_ - 17 Nonconuen gas conforms to A$31,05,030Q.1 A),Q,2.A-D) - - NA_ - __ 18 _ - - - Conductor strmgprovded - - - _ NA Engineering 19 Surface casing. protects all known. USDWs NA 'i20 CMT vol_ adequate to circulate on conductor & surf csg NA ',21 CMT vol adequ_ateto tie-in long string to surf csg_ NA- 22 CMT will coverall known_pro_ductive horizons- Yes Adequate excess, ',23 Casing designs adequate f_or C, T 6 & permafrost- _ - Yes 124 Adequate tankage_or reserve pit . Yes _ - - - - - CTDU. '25 If are•drill, has a 10-403 fo_r abandonment been approved Yes X26 Adequate wellbore separation-proposed- _ _ -_ Yes. 27 If diverter required, does it meet_regulations- NA - - - - - Sidetrack. - '28 Drilling fluid program schematic & equip list adequate- Yes Max MW 8,ti ppg, Appr Date 29 BOPEs,_do they meet. regulation - - Yes WGA 9!11/2006 '30 BOPE-press rating appropriate; test to (put prig in comments) Yes Test to 3500 psi. MSP 2320 psi. '31 Choke manifold complies wlAPI_RP-53 (May 84)_ Yes . - ~32 Work will occur without operation shutdown. Yes - - - - 133 Is Rresence-of H2S gas probable - - Yes 200 ppm max on pad. 1',34 Mechanical condition of wells within AOR verified (For-service well only) NA- - - - - - 35 ___ _- __- Permit can be issued w/o-hydrogen-sulfide measures - - No - - - Geology 1,,36 Data presented on-potential overpressure zones NA_ - - 37 Seismic analysisof shallow gas zones- - NA- _ . Appr Date 138 Seabed condition survey (ifoff-shore) NA - - - RPC 9/11/2006 1,39 Contact namelphone for weekly-progress reports. [exploratory only] NA- Geologic Engineering Public Commissioner: Date: Commissioner: Date Commi io er Date pis 9->>I b 9 /r~,~ 9-rz -o.,G • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 08/05/14 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/03/21 1382322 O1 3.0" CTK *** LIS COMMENT RECORD *** !!~~!!!!!!~~~!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 13104.0000: Starting Depth STOP.FT 14111.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: A-42A FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 15' 47.794"N 148 deg 26.332"W CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 21-Mar-2007 API API NUMBER: 500292254201 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 35 TOWN.N T11N RANG. R13E PDAT. MSL EPD .F 0 LMF RF FAPD.F 85.5 DMF RF EKB .F 0 EDF .F 85.5 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD)unless otherwise noted. ~~_ t3o ~C~a~~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Speery Sun dated Ol-Feb-1995. This PDCL is for well A-42A. (8) The sidetrack was drilled from A-42 through a milled window in 4 1/2" Slotted liner. Top of window 13208 ft.MD (8866.0 ft.TVDSS) Bottom of window 13216 ft.MD (8869.0 ft.TVDSS) (9) Tied to A-42 at 13195.65 ft.MD (8860.73 ft. TVDSS) (10) MWD runs 1 and 2 were used to set the Whipstock and Mill the window. No logging data is presented for these runs. (11) Resistivity data presented from 13185 ft MD (8856 ft. TVDSS) to 14054 ft. MD (8927 ft. TVDSS) is MAD data. The drilled data was not presented and replaced by the MAD data per the wellsite geologist. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) (400kHz),Ohm-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) (2MHz),Ohm-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9708.67, 9708.67, ! 0 9713.23, 9711.16, ! -2.07324 9714.89, 9712.82, ! -2.07324 9724.63, 9718.41, ! -6.21875 9731.36, 9730.74, ! -0.62207 9732.39, 9731.57, ! -0.829102 9733.85, 9732.81, ! -1.03613 9735.92, 9735.5, ! -0.415039 9738.2, 9737.58, ! -0.62207 9739.86, 9738.82, ! -1.03613 9741.31, 9740.89, ! -0.415039 9742.55, 9741.93, ! -0.621094 9743.59, 9743.17, ! -0.415039 9775.34, 9775.14, ! -0.207031 9776.38, 9776.17, ! -0.208008 9778.87, 9778.66, ! -0.207031 9779.45, 9779.24, ! -0.208008 9780.53, 9780.11, ! -0.415039 9781.73, 9780.9, ! -0.829102 9782.77, 9782.35, ! -0.414062 9784.47, 9783.84, ! -0.62207 9786.12, 9787.37, ! 1.24414 9822.82, 9823.65, ! 0.829102 9824.27, 9825.3, ! 1.03613 9837.54, 9840.02, ! 2.48828 9838.99, 9841.27, 9855.66, 9855.25, 9858.36, 9856.7, 9859.19, 9857.32, 9859.6, 9857.94, 9860.43, 9858.98, 9865.2, 9863.12, 9866.03, 9864.16, 9867.36, 9865.7, 9873.48, 9872.86, 9874.93, 9873.69, 9876.38, 9874.72, 9883.43, 9883.02, 9884.88, 9884.05, 9886.96, 9885.92, 9889.65, 9888.41, 9890.06, 9888.82, 9890.89, 9889.86, 9898.36, 9897.11, 9899.81, 9898.98, 9906.03, 9904.16, 9907.27, 9905.82, 9908.1, 9906.44, 9909.44, 9907.78, 9914.62, 9911.1, 9915.66, 9912.55, 9917.11, 9914.21, 9933.8, 9932.35, 9941.06, 9939.19, 9941.68, 9940.02, 9942.1, 9940.44, 9943.13, 9941.68, 9943.96, 9942.1, 9944.79, 9942.92, 9947.28, 9944.38, 9954, 9952.55, ! 9955.25, 9953.38, 9956.08, 9954.21, 9957.11, 9954.83, 9958.77, 9956.49, 9959.6, 9957.53, 9960.64, 9958.15, 9961.47, 9959.39, 9962.92, 9961.26, 9964.83, 9962.76, 9965.87, 9963.58, 9968.93, 9967.06, 9969.55, 9967.89, 9970.38, 9968.93, 9972.66, 9970.79, 9973.7, 9972.45, 9974.11, 9973.28, 9976.02, 9975.4, 9984.06, 9983.02, 9985.72, 9984.68, 9992.56, 9990.28, 9997.62, 9995.14, 10002.2, 10001.1, 10004.3, 10003, 10005.6, 10003.8, 10007.3, 10006.2, 10008.2, 10007, 10009.2, 10008.6, 10012.1, 10012.1, 10015.7, 10014.3, 10017.4, 10015.5, 10018.2, 10016.5, 2.28027 -0.415039 -1.6582 -1.86523 -1.65918 -1.45117 -2.07324 -1.86523 -1.6582 -0.621094 -1.24316 -1.6582 -0.415039 -0.829102 -1.03613 -1.24414 -1.24316 -1.03613 -1.24414 -0.829102 -1.86523 -1.45117 -1.6582 -1.6582 -3.52441 -3.10938 -2.90234 -1.4502 -1.86621 -1.6582 -1.6582 -1.45117 -1.86621 -1.86621 -2.90234 -1.45117 -1.86523 -1.86523 -2.28027 -2.28027 -2.07324 -2.4873 -2.07324 -1.6582 -2.07324 -2.28027 -1.86621 -1.6582 -1.45117 -1.86621 -1.24414 -0.829102 -0.62207 -1.03711 -1.03711 -2.28027 -2.4873 -1.03613 -1.24414 -1.86621 -1.03613 -1.24316 -0.62207 0 -1.4502 -1.86621 -1.6582 10065.1, 10063.9, 10066.2, 10064.7, 10066.8, 10065.8, 10068.9, 10067.4, 10069.3, 10067.8, 10089.2, 10087.9, 10089.6, 10088.6, 10090, 10088.8, 10091.1, 10090, 10108.9, 10111.4, 10110.6, 10113.5, 10114.1, 10116.8, 10134, 10135.5, 10134.8, 10136.3, 10155.8, 10154.1, 10159.1, 10157, 10160.5, 10158.5, 10162.4, 10160.3, 10163.2, 10161.6, 10163.6, 10162.8, 10165.1, 10164.3, 10183.3, 10180.4, 10184.2, 10181.3, 10185.4, 10183.3, 10190.2, 10189, 10192.9, 10191.2, 10195.1, 10193.1, 10196, 10194.5, 10197.5, 10196.4, 10198.9, 10197.7, 10200.3, 10198.9, 10204.1, 10202.2, 10205.1, 10203.6, 10209.7, 10206.5, 10209.9, 10206.8, 10211.9, 10208.4, 10213.8, 10209, 10215, 10210.9, 10216.5, 10214.2, 10218.6, 10215.1, 10219.8, 10216.1, 10221.5, 10218.6, 10228.3, 10226.9, 10230.4, 10228.1, 10232, 10230.2, 10233.1, 10231, 10234.5, 10232.5, 10235.6, 10234.6, 10236.9, 10236.6, 10237.9, 10237.5, 10242.9, 10240.4, 10243.9, 10241.6, 10244.9, 10242.5, 10246.2, 10243.7, 10246.8, 10246.2, 10252.2, 10249.5, 10258.2, 10257.6, 10262.4, 10259.9, 10264, 10261.7, 10274.6, 10272.7, 10275.8, 10274, 10276.9, 10275.6, 10278.5, 10277.3, 10280.5, 10278.7, 10287, 10283.8, 10288.4, 10284.9, 10291.5, 10289.9, -1.24414 -1.45117 -1.03711 -1.45117 -1.45117 -1.24414 -1.03711 -1.24316 -1.03711 2.4873 2.90137 2.69531 1.95117 1.45117 -1.6582 -2.07324 -2.07324 -2.07324 -1.6582 -0.829102 -0.829102 -2.90234 -2.90234 -2.07227 -1.24414 -1.6582 -2.07324 -1.45117 -1.03613 -1.24316 -1.45117 -1.86621 -1.45117 -3.10938 -3.10938 -3.52441 -4.76758 -4.14551 -2.28027 -3.52441 -3.73145 -2.90234 -1.45117 -2.28027 -1.86523 -2.07324 -2.07324 -1.03711 -0.207031 -0.415039 -2.4873 -2.28027 -2.48828 -2.4873 -0.62207 -2.69531 -0.62207 -2.48828 -2.28027 -1.86523 -1.86523 -1.24316 -1.24414 -1.86621 -3.10938 -3.52441 -1.6582 _J 10293.6, 10292.1, 10296.7, 10294, 10298.8, 10297.9, 10302.1, 10300.8, 10302.9, 10301.9, 10304.2, 10303.1, 10305.4, 10304, 10306.6, 10305.2, 10307.4, 10306.1, 10312.7, 10311.6, 10314.3, 10313.1, 10319.7, 10317.4, 10319.9, 10318, 10321, 10319.7, 10321.6, 10320.5, 10323, 10322.4, 10324.5, 10323.6, 10326.8, 10325.4, 10328.7, 10326.8, 10333, 10331.6, 10336.4, 10333.5, 10338.4, 10335.5, 10340.3, 10337.6, 10345, 10343.6, 10358.2, 10357.4, 10360.1, 10359.1, 10361.2, 10361.4, 10380.2, 10379.4, 10381.5, 10380.4, 10444.6, 10443.8, 10447.5, 10447.1, 10450.1, 10448.4, 10452.3, 10450.4, 10455, 10453.1, 10508.6, 10505.1, 10509.7, 10507.4, 10511.3, 10509, 10528.9, 10524, 10531.2, 10526.2, 10532.5, 10528.1, 10544.1, 10541.2, 10549.2, 10544.7, 10691.9, 10690.1, 10694.2, 10691.9, 10695.9, 10693.2, 10698.1, 10696.5, 10699.4, 10697.5, 10701.1, 10699.2, 10704.4, 10702.3, 10705.8, 10704.4, 10710, 10708.1, 10711.8, 10710.2, 10716, 10715.2, 10720.7, 10721, 10723.4, 10723.2, 10762.5, 10761.2, 10879.3, 10876.9, 10882.2, 10880, 10884.3, 10882.9, 10886.2, 10884.9, 11002.1, 11001.5, 11044, 11041.9, 11130.1, 11127, 11133.2, 11131.5, 11136.3, 11134, 11141.3, 11136.9, 11180, 11177.7, -1.45117 -2.69531 -0.830078 -1.24414 -1.03613 -1.03711 -1.45117 -1.45117 -1.24316 -1.03711 -1.24414 -2.28027 -1.86523 -1.24414 -1.03613 -0.62207 -0.829102 -1.45117 -1.86523 -1.45117 -2.90234 -2.90234 -2.69434 -1.45117 -0.829102 -1.03613 0.207031 -0.829102 -1.03613 -0.829102 -0.414062 -1.6582 -1.86621 -1.86523 -3.52344 -2.28027 -2.28027 -4.97559 -4.97559 -4.35254 -2.90137 -4.56055 -1.86621 -2.28027 -2.69531 -1.6582 -1.86523 -1.86621 -2.07227 -1.45117 -1.86523 -1.65918 -0.830078 0.208008 -0.207031 -1.24414 -2.4873 -2.28027 -1.45117 -1.24414 -0.621094 -2.07324 -3.10938 -1.6582 -2.28027 -4.35352 -2.28027 ~~ 11181, 11179.3, 11183, 11180.1, 11184.3, 11182.4, 11185.6, 11183.9, 11186.8, 11184.7, 11187, 11185.4, 11189.1, 11187.4, 11190.3, 11188.9, 11191.4, 11190.1, 11192.8, 11191.4, 11194.1, 11192.4, 11196.1, 11193.6, 11196.5, 11195.1, 11197.4, 11196.1, 11197.8, 11197, 11227.8, 11226.4, 11230.1, 11228.5, 11232, 11229.5, 11237.8, 11235.1, 11240.3, 11238.6, 11241.1, 11239.5, 11260.3, 11259.1, 11260.8, 11259.6, 11262.6, 11261.4, 11264.1, 11263, 11265.8, 11264.8, 11274, 11272.3, 11276.9, 11274.8, 11280.7, 11277.2, 11335.1, 11333.7, 11339.9, 11338.8, 11343.2, 11343, 11345.1, 11345.7, 11346.7, 11346.5, 11349.4, 11349, 11352, 11352.6, 11354, 11353.6, 11355.6, 11355, 11357.7, 11356.7, 11358.5, 11357.5, 11360, 11359.8, 11362.5, 11361.2, 11367.2, 11365.2, 11561.5, 11560.6, 11562.5, 11561.7, 11563.1, 11562.1, 11564.2, 11563.3, 13107.2, 13107.4, 13119.9, 13121.1, 13130.8, 13132.9, 13131.9, 13134.4, 13132.9, 13135.6, 13133.5, 13136.9, 13135, 13138.7, 13136, 13139.6, 13137.1, 13140.8, 13138.1, 13141.8, 13138.5, 13143.5, 13140.2, 13145.1, 13140.6,1314 6, 13141.6, 13147, 13143.3, 13148.3, 13151, 13153.4, 13152.2, 13154.7, 13153.4, 13155.7, 13164.2, 13161.7, 13164.8, 13162.8, ! -1.6582 ! -2.90137 ! -1.86523 ! -1.65918 ! -2.07324 ! -1.6582 ! -1.6582 ! -1.45117 ! -1.24316 ! -1.45117 ! -1.65918 ! -2.4873 ! -1.45117 ! -1.24414 ! -0.830078 ! -1.45117 ! -1.65918 ! -2.4873 ! -2.69434 ! -1.6582 ! -1.6582 ! -1.24316 ! -1.24414 ! -1.24316 ! -1.03613 ! -1.03613 -1.6582 ! -2.07324 ! -3.52441 ! -1.45117 ! -1.03613 -0.208008 ! 0.62207 ! -0.207031 ! -0.415039 ! 0.62207 ! -0.415039 ! -0.62207 ! -1.03711 ! -1.03711 ! -0.208008 ! -1.24414 ! -2.07324 ! -0.829102 ! -0.829102 ! -1.03711 ! -0.829102 ! 0.208008 ! 1.24414 ! 2.07324 ! 2.4873 ! 2.69531 ! 3.31641 3.73145 3.52441 ! 3.73145 ! 3.73145 ! 4.97559 ! 4.97559 5.38965 5.38965 ! 4.97461 2.4873 ! 2.4873 ! 2.28027 ! -2.4873 ! -2.07324 13166.7, 13164.6, ! -2.07324 13167.3, 13165.5, ! -1.86523 13168.2, 13166.9, ! -1.24414 13168.8, 13167.5, ! -1.24414 13169.8, 13168.6, ! -1.24316 13170.4, 13169.6, ! -0.829102 13171.7, 13171.7, ! 0 13172.7, 13172.5, ! -0.207031 13173.1, 13173.3, ! 0.207031 13175, 13174.8, ! -0.207031 13176.7, 13176, ! -0.62207 13179.1, 13177.3, ! -1.86523 13180.4, 13179.6, ! -0.829102 13181.4, 13180.6, ! -0.829102 13183.1, 13181.8, ! -1.24414 13190, 13187.9, ! -2.07324 13193.5, 13195.2, ! 1.6582 13195.6, 13197.1, ! 1.4502 13197.1, 13198.3, ! 1.24414 13198.7, 13200.2, ! 1.4502 13200.8, 13204.5, ! 3.73145 13201.8, 13205.1, ! 3.31641 13203.9, 13206.2, ! 2.28027 13205.6, 13208, ! 2.4873 13206.8, 13208.7, ! 1.86621 13209.9, 13211, ! 1.03711 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 395 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN A_42A_5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN A-42A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!iiiii!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Speery Sun dated 01-Feb-95. This PDCL was used for well A-42A. Resistivity data presented here is MAD Pass data. The drilled data was not presented i and replaced with MAD data per the wellsite geologist. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 56 Tape File Start Depth = 13104.000000 Tape File End Depth = 14111.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 69 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 ~ ~ 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN A_42A_GAMMA_RES.xtf LCC 150 CN BP Exploration (Alaska) WN A-42A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -------- --- CNAM ODEP GR ----- -- GR ------------ GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 56 Tape File Start Depth = 13104.000000 Tape File End Depth = 14110.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 69 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/03/21 1382322 01 **** REEL TRAILER **** MWD 08/05/14 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP RPD RPS 13104.0000 74.7001 -999.2500 -999.2500 -999.2500 13104.5000 72.2685 -999.2500 -999.2500 -999.2500 13200.0000 74.0705 -999.2500 -999.2500 -999.2500 13300.0000 156.7520 15.8594 26.0559 23.7762 13400.0000 31.3234 64.5004 6.5546 5.9674 13500.0000 22.7375 66.9449 3.4606 3.1736 13600.0000 31.9441 95.0598 3.4762 3.3684 13700.0000 32.2383 73.8621 4.9920 4.3570 13800.0000 54.8625 92.1008 7.1906 6.5794 13900.0000 27.1812 88.9594 11.0101 14.1604 14000.0000 33.1148 48.0391 6.3748 6.0684 14100.0000 -999.2500 41.4211 -999.2500 -999.2500 14111.0000 -999.2500 120.7156 -999.2500 -999.2500 Tape File Start Depth = 13104.000000 Tape File End Depth = 14111.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet RAD -999.2500 -999.2500 -999.2500 80.3107 7.8473 4.3336 4.2690 6.7744 9.0745 9.9178 7.7800 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 39.7938 7.7129 3.7558 3.5446 5.3616 8.0328 10.3292 7.3027 -999.2500 -999.2500 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 13104.0000 74.6000 -999.250C -999.2500 -999.2500 13104.5000 71.9000 -999.250C -999.2500 -999.2500 13200.0000 78.5000 -999.250C -999.2500 -999.2500 13300.0000 117.7000 20.8000 30.5630 22.9900 13400.0000 52.6000 63.7000 6.7100 6.4880 13500.0000 31.8000 76.0000 3.4620 3.1690 13600.0000 33.6000 93.7000 3.5120 3.4210 13700.0000 31.8000 57.0000 4.9660 4.3570 13800.0000 70.7000 90.5000 7.1350 6.4420 13900.0000 24.4000 78.6000 10.7210 13.7700 14000.0000 29.4000 46.5000 6.2870 5.9060 14100.0000 -999.2500 41,6000 -999.2500 -999.2500 14110.0000 -999.2500 134.9000 -999.2500 -999.2500 Tape File Start Depth = 13104.000000 Tape File End Depth = 14110.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet RAD -999.2500 -999.2500 -999.2500 60.4600 7.5940 4.3700 4.3260 6.7570 8.9270 9.8220 7.8820 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 35.8060 7.6210 3.7800 3.5890 5.3530 8.1620 10.1080 7.3230 -999.2500 -999.2500 r • Tape Subfile 4 is type: LIS • • **** REEL HEADER **** MWD 08/02/25 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/03/21 1382322 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 13208.0000: Starting Depth STOP.FT 14111.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: A-42A FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 15' 47.794"N 148 deg 26.332"W CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 21-Mar-2007 API API NUMBER: 50029225420100 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 35 TOWN.N T11N RANG. R13E . PDAT. MSL EPD .F 0 LMF RF FAPD.F 85.5 DMF RF EKB .F 0 EDF .F 85.5 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD)unless otherwise noted. C7(J~.p~~W ~ !lDO~b ~ ~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (SSTVD) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Speery Sun dated O1-Feb-1995. (8) The sidetrack was drilled from A-42 through a milled window in 4 1/2" Slotted liner. Top of window 13208 ft.MD (8866.0 ft.SSTVD) Bottom of window 13216 ft.MD (8869.0 ft.SSTVD) (9) Tied to A-42 at 13195.65 ft.MD (8860.73 ft. SSTVD) (10) MWD runs 1 and 2 were used to set the Wgipstock and Mill the window. No logging data is presented for these runs. (11) Resistivity data presented from 13185 ft MD (8856 ft. TVD) to 14054 ft. MD (8927 ft. TVD) is MAD data. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) (400kHz),Ohm-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) (2MHz),Ohm-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9708.67, 9708.67, ! 0 9713.23, 9711.16, ! -2.07324 9714.89, 9712.82, ! -2.07324 9724.63, 9718.41, ! -6.21875 9731.36, 9730.74, ! -0.62207 9732.39, 9731.57, ! -0.829102 9733.85, 9732.81, ! -1.03613 9735.92, 9735.5, ! -0.415039 9738.2, 9737.58, ! -0.62207 9739.86, 9738.82, ! -1.03613 9741.31, 9740.89, ! -0.415039 9742.55, 9741.93, ! -0.621094 9743.59, 9743.17, ! -0.415039 9775.34, 9775.14, ! -0.207031 9776.38, 9776.17, ! -0.208008 9778.87, 9778.66, ! -0.207031 9779.45, 9779.24, ! -0.208008 9780.53, 9780.11, ! -0.415039 9781.73, 9780.9, ! -0.829102 9782.77, 9782.35, ! -0.414062 9784.47, 9783.84, ! -0.62207 9786.12, 9787.37, ! 1.24414 9822.82, 9823.65, ! 0.829102 9824.27, 9825.3, ! 1.03613 9837.54, 9840.02, ! 2.48828 9838.99, 9841.27, ! 2.28027 9855.66, 9855.25, ! -0.415039 9858.36, 9856.7, ! -1.6582 9859.19, 9857.32, ! -1.86523 9859.6, 9857.94, ! -1.65918 9860.43, 9858.98, ! -1.45117 9865.2, 9863.12, ! -2.07324 9866.03, 9864.16, ! -1.86523 9867.36, 9865.7, ! -1.6582 9873.48, 9872.86, ! -0.621094 9874.93, 9873.69, ! -1.24316 9876.38, 9874.72, ! -1.6582 9883.43, 9883.02, ! -0.415039 9884.88, 9884.05, ! -0.829102 9886.96, 9885.92, ! -1.03613 9889.65, 9888.41, ! -1.24414 9890.06, 9888.82, ! -1.24316 9890.89, 9889.86, ! -1.03613 9898.36, 9897.11, ! -1.24414 9899.81, 9898.98, ! -0.829102 9906.03, 9904.16, ! -1.86523 9907.27, 9905.82, ! -1.45117 9908.1, 9906.44, ! -1.6582 9909.44, 9907.78, ! -1.6582 9914.62, 9911.1, ! -3.52441 9915.66, 9912.55, ! -3.10938 9917.11, 9914.21, ! -2.90234 9933.8, 9932.35, ! -1.4502 9941.06, 9939.19, ! -1.86621 9941.68, 9940.02, ! -1.6582 9942.1, 9940.44, ! -1.6582 9943.13, 9941.68, ! -1.45117 9943.96, 9942.1, ! -1.86621 9944.79, 9942.92, ! -1.86621 9947.28, 9944.38, ! -2.90234 9954, 99 52.55, ! -1.45117 9955.25, 9953.38, ! -1.86523 9956.08, 9954.21, ! -1.86523 9957.11, 9954.83, ! -2.28027 9958.77, 9956.49, ! -2.28027 9959.6, 9957.53, ! -2.07324 9960.64, 9958.15, ! -2.4873 9961.47, 9959.39, ! -2.07324 9962.92, 9961.26, ! -1.6582 9964.83, 9962.76, ! -2.07324 9965.87, 9963.58, ! -2.28027 9968.93, 9967.06, ! -1.86621 9969.55, 9967.89, ! -1.6582 9970.38, 9968.93, ! -1.45117 9972.66, 9970.79, ! -1.86621 9973.7, 9972.45, ! -1.24414 9974.11, 9973.28, ! -0.829102 9976.02, 9975.4, ! -0.62207 9984.06, 9983.02, ! -1.03711 9985.72, 9984.68, ! -1.03711 9992.56, 9990.28, ! -2.28027 9997.62, 9995.14, ! -2.4873 10002.2, 10001.1, ! -1.03613 10004.3, 10003, ! -1.24414 10005.6, 10003.8, ! -1.86621 10007.3, 10006.2, ! -1.03613 10008.2, 10007, ! -1.24316 10009.2, 10008.6, ! -0.62207 10012.1, 10012.1, ! 0 10015.7, 10014.3, ! -1.4502 10017.4, 10015.5, ! -1.86621 10018.2, 10016.5, ! -1.6582 10065.1, 10063.9, ! -1.24414 10066.2, 10064.7, ! -1.45117 10066.8, 10065.8, 10068.9, 10067.4, 10069.3, 10067.8, 10089.2, 10087.9, 10089.6, 10088.6, 10090, 10088.8, 10091.1, 10090, 10108.9, 10111.4, 10110.6, 10113.5, 10114.1, 10116.8, 10134, 10135.5, 10134.8, 10136.3, 10155.8, 10154.1, 10159.1, 10157, 10160.5, 10158.5, 10162.4, 10160.3, 10163.2, 10161.6, 10163.6, 10162.8, 10165.1, 10164.3, 10183.3, 10180.4, 10184.2, 10181.3, 10185.4, 10183.3, 10190.2, 10189, 10192.9, 10191.2, 10195.1, 10193.1, 10196, 10194.5, 10197.5, 10196.4, 10198.9, 10197.7, 10200.3, 10198.9, 10204.1, 10202.2, 10205.1, 10203.6, 10209.7, 10206.5, 10209.9, 10206.8, 10211.9, 10208.4, 10213.8, 10209, 10215, 10210.9, 10216.5, 10214.2, 10218.6, 10215.1, 10219.8, 10216.1, 10221.5, 10218.6, 10228.3, 10226.9, 10230.4, 10228.1, 10232, 10230.2, 10233.1, 10231, 10234.5, 10232.5, 10235.6, 10234.6, 10236.9, 10236.6, 10237.9, 10237.5, 10242.9, 10240.4, 10243.9, 10241.6, 10244.9, 10242.5, 10246.2, 10243.7, 10246.8, 10246.2, 10252.2, 10249.5, 10258.2, 10257.6, 10262.4, 10259.9, 10264, 10261.7, 10274.6, 10272.7, 10275.8, 10274, 10276.9, 10275.6, 10278.5, 10277.3, 10280.5, 10278.7, 10287, 10283.8, 10288.4, 10284.9, 10291.5, 10289.9, 10293.6, 10292.1, 10296.7, 10294, -1.03711 -1.45117 -1.45117 -1.24414 -1.03711 -1.24316 -1.03711 2.4873 2.90137 2.69531 1.45117 1.45117 -1.6582 -2.07324 -2.07324 -2.07324 -1.6582 -0.829102 -0.829102 -2.90234 -2.90234 -2.07227 -1.24414 -1.6582 -2.07324 -1.45117 -1.03613 -1.24316 -1.45117 -1.86621 -1.45117 -3.10938 -3.10938 -3.52441 -4.76758 -4.14551 -2.28027 -3.52441 -3.73145 -2.90234 -1.45117 -2.28027 -1.86523 -2.07324 -2.07324 -1.03711 -0.207031 -0.415039 -2.4873 -2.28027 -2.48828 -2.4873 -0.62207 -2.69531 -0.62207 -2.48828 -2.28027 -1.86523 -1.86523 -1.24316 -1.24414 -1.86621 -3.10938 -3.52441 -1.6582 -1.45117 -2.69531 10298.8, 10297.9, 10302.1, 10300.8, 10302.9, 10301.9, 10304.2, 10303.1, 10305.4, 10304, 10306.6, 10305.2, 10307.4, 10306.1, 10312.7, 10311.6, 10314.3, 10313.1, 10319.7, 10317.4, 10319.9, 10318, 10321, 10319.7, 10321.6, 10320.5, 10323, 10322.4, 10324.5, 10323.6, 10326.8, 10325.4, 10328.7, 10326.8, 10333, 10331.6, 10336.4, 10333.5, 10338.4, 10335.5, 10340.3, 10337.6, 10345, 10343.6, 10358.2, 10357.4, 10360.1, 10359.1, 10361.2, 10361.4, 10380.2, 10379.4, 10381.5, 10380.4, 10444.6, 10443.8, 10447.5, 10447.1, 10450.1, 10448.4, 10452.3, 10450.4, 10455, 10453.1, 10508.6, 10505.1, 10509.7, 10507.4, 10511.3, 10509, 10528.9, 10524, 10531.2, 10526.2, 10532.5, 10528.1, 10544.1, 10541.2, 10549.2, 10544.7, 10691.9, 10690.1, 10694.2, 10691.9, 10695.9, 10693.2, 10698.1, 10696.5, 10699.4, 10697.5, 10701.1, 10699.2, 10704.4, 10702.3, 10705.8, 10704.4, 10710, 10708.1, 10711.8, 10710.2, 10716, 10715.2, 10720.7, 10721, 10723.4, 10723.2, 10762.5, 10761.2, 10879.3, 10876.9, 10882.2, 10880, 10884.3, 10882.9, 10886.2, 10884.9, 11002.1, 11001.5, 11044, 11041.9, 11130.1, 11127, 11133.2, 11131.5, 11136.3, 11134, 11141.3, 11136.9, 11180, 11177.7, 11181, 11179.3, 11183, 11180.1, -0.830078 -1.24414 -1.03613 -1.03711 -1.45117 -1.45117 -1.24316 -1.03711 -1.24414 -2.28027 -1.86523 -1.24414 -1.03613 -0.62207 -0.829102 -1.45117 -1.86523 -1.45117 -2.90234 -2.90234 -2.69434 -1.45117 -0.829102 -1.03613 0.207031 -0.829102 -1.03613 -0.829102 -0.414062 -1.6582 -1.86621 -1.86523 -3.52344 -2.28027 -2.28027 -4.97559 -4.97559 -4.35254 -2.90137 -4.56055 -1.86621 -2.28027 -2.69531 -1.6582 -1.86523 -1.86621 -2.07227 -1.45117 -1.86523 -1.65918 -0.830078 0.208008 -0.207031 -1.24414 -2.4873 -2.28027 -1.45117 -1.24414 -0.621094 -2.07324 -3.10938 -1.6582 -2.28027 -4.35352 -2.28027 -1.6582 -2.90137 11184.3, 11182.4, 11185.6, 11183.9, 11186.8, 11184.7, 11187, 11185.4, 11189.1, 11187.4, 11190.3, 11188.9, 11191.4, 11190.1, 11192.8, 11191.4, 11194.1, 11192.4, 11196.1, 11193.6, 11196.5, 11195.1, 11197.4, 11196.1, 11197.8, 11197, 11227.8, 11226.4, 11230.1, 11228.5, 11232, 11229.5, 11237.8, 11235.1, 11240.3, 11238.6, 11241.1, 11239.5, 11260.3, 11259.1, 11260.8, 11259.6, 11262.6, 11261.4, 11264.1, 11263, 11265.8, 11264.8, 11274, 11272.3, 11276.9, 11274.8, 11280.7, 11277.2, 11335.1, 11333.7, 11339.9, 11338.8, 11343.2, 11343, 11345.1, 11345.7, 11346.7, 11346.5, 11349.4, 11349, 11352, 11352.6, 11354, 11353.6, 11355.6, 11355, 11357.7, 11356.7, 11358.5, 11357.5, 11360, 11359.8, 11362.5, 11361.2, 11367.2, 11365.2, 11561.5, 11560.6, 11562.5, 11561.7, 11563.1, 11562.1, 11564.2, 11563.3, 13107.2, 13107.4, 13119.9, 13121.1, 13130.8, 13132.9, 13131.9, 13134.4, 13132.9, 13135.6, 13133.5, 13136.9, 13135, 13138.7, 13136, 13139.6, 13137.1, 13140.8, 13138.1, 13141.8, 13138.5, 13143.5, 13140.2, 13145.1, 13140.6, 13146, 13141.6, 13147, 13143.3, 13148.3, 13151, 13153.4, 13152.2, 13154.7, 13153.4, 13155.7, 13164.2, 13161.7, 13164.8, 13162.8, 13166.7, 13164.6, 13167.3, 13165.5, -1.86523 -1.65918 -2.07324 -1.6582 -1.6582 -1.45117 -1.24316 -1.45117 -1.65918 -2.4873 -1.45117 -1.24414 -0.830078 -1.45117 -1.65918 -2.4873 -2.69434 -1.6582 -1.6582 -1.24316 -1.24414 -1.24316 -1.03613 -1.03613 -1.6582 -2.07324 -3.52441 -1.45117 -1.03613 -0.208008 0.62207 -0.207031 -0.415039 0.62207 -0.415039 -0.62207 -1.03711 -1.03711 -0.208008 -1.24414 -2.07324 -0.829102 -0.829102 -1.03711 -0.829102 0.208008 1.24414 2.07324 2.4873 2.69531 3.31641 3.73145 3.52441 3.73145 3.73145 4.97559 4.97559 5.38965 5.38965 4.97461 2.4873 2.4873 2.28027 -2.4873 -2.07324 -2.07324 -1.86523 • • • 13168.2, 13166.9, ! -1.24414 13168.8, 13167.5, ! -1.24414 13169.8, 13168.6, ! -1.24316 13170.4, 13169.6, ! -0.829102 13171.7, 13171.7, ! 0 13172.7, 13172.5, ! -0.207031 13173.1, 13173.3, ! 0.207031 13175, 13174.8, ! -0.207031 13176.7, 13176, ! -0.62207 13179.1, 13177.3, ! -1.86523 13180.4, 13179.6, ! -0.829102 13181.4, 13180.6, ! -0.829102 13183.1, 13181.8, ! -1.24414 13190, 13187.9, ! -2.07324 13193.5, 13195.2, ! 1.6582 13195.6, 13197.1, ! 1.4502 13197.1, 13198.3, ! 1.24414 13198.7, 13200.2, ! 1.4502 13200.8, 13204.5, ! 3.73145 13201.8, 13205.1, ! 3.31641 13203.9, 13206.2, ! 2.28027 13205.6, 13208, ! 2.4873 13206.8, 13208.7, ! 1.86621 13209.9, 13211, ! 1.03711 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 395 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN A 42A 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN A-42A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Speery Sun dated 01-Feb-95. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ------------------------- - ODEP - ------------- GR GR GRAX ------ 0.0 ------ ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 51 Tape File Start Depth = 13208.000000 Tape File End Depth = 14111.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 64 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 • *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN A_42A_GAMMA_RES.xtf LCC 150 CN BP Exploration (Alaska) WN A-42A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -- -- CNAM ODEP GRAX ----------- --- GRAX ----------- GRAX ------------------ 0.0 ROPS ROPS ROPA 0.0 RACL RACL RACLX 0.0 RACH RACH RACHX 0.0 RPCL RPCL RPCLX 0.0 RPCH RPCH RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GRAX MWD 68 1 AAPI 2 ROPS MWD 68 1 F/HR 3 RACL MWD 68 1 OHMM 4 RACH MWD 68 1 OHMM 5 RPCL MWD 68 1 OHMM 6 RPCH MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 51 Tape File Start Depth = 13208.000000 Tape File End Depth = 14110.000000 Tape File Level Spacing = 0.500000 • Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 64 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/03/21 1382322 O1 **** REEL TRAILER **** MWD 08/02/25 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes • Tape Subfile 1 is type: LIS i Tape Subfile 2 is type: LIS DEPTH GR ROP RPD RPS 13208.0000 111.6480 -999.250C -999.2500 -999.2500 13208.5000 126.0919 -999.250C -999.2500 -999.2500 13300.0000 156.7520 15.8594 26.0559 23.7?62 13400.0000 31.3234 64.5009 6.5546 5.9674 13500.0000 22.7375 66.944°. 3.4606 3.1736 13600.0000 31.9441 95.0598 3.4762 3.3684 13700.0000 32.2383 73.8621 4.9920 4.3570 13800.0000 54.8625 92.1008 7.1906 6.5794 13900.0000 27.1812 88.9594 11.0101 14.1604 14000.0000 33.1148 48.0391 6.3748 6.0684 14100.0000 -999.2500 41.4211 -999.2500 -999.2500 14111.0000 -999.2500 120.7156 -999.2500 -999.2500 Tape File Start Depth = 13208.000000 Tape File End Depth = 14111.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • RAD -999.2500 -999.2500 80.3107 7.8473 4.3336 4.2690 6.7744 9.0745 9.9178 7.7800 -999.2500 -999.2500 RAS -999.2500 -999.2500 39.7938 7.7129 3.7558 3.5446 5.3616 8.0328 10.3292 7.3027 -999.2500 -999.2500 Tape Subfile 3 is type: LIS DEPTH GRAX ROPS RPCL RPCH 13208.0000 126.7000 -999.2500 -999.2500 -999.2500 13208.5000 125.5000 -999.2500 -999.2500 -999.2500 13300.0000 117.7000 20.8000 30.5630 22.9900 13400.0000 52.6000 63.7000 6.7100 6.4880 13500.0000 31.8000 76.0000 3.4620 3.1690 13600.0000 33.6000 93.7000 3.5120 3.4210 13700.0000 31.8000 57.0000 4.9660 4.3570 13800.0000 70.7000 90.5000 7.1350 6.4420 13900.0000 24.4000 78.6000 10.7210 13.7700 14000.0000 29.4000 46.5000 6.2870 5.9060 14100.0000 -999.2500 41.6000 -999.2500 -999.2500 14110.0000 -999.2500 134.9000 -999.2500 -999.2500 Tape File Start Depth = 13208.000000 Tape File End Depth = 14110.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet RACL -999.2500 -999.2500 60.4600 7.5940 4.3700 4.3260 6.7570 8.9270 9.8220 7.8820 -999.2500 -999.2500 RACH -999.2500 -999.2500 35.8060 7.6210 3.7800 3.5890 5.3530 8.1620 10.1080 7.3230 -999.2500 -999.2500 r~ u Tape Subfile 4 is type: LIS