Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout206-134Post Office Box 244027
Anchorage, AK 99524-4027
3800 Centerpoint Drive
Suite 1400
Anchorage, AK 99503
Phone: (907) 564-4891
02/09/2024
Mr. Mel Rixse
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor
through 02/09/2024.
Dear Mr. Rixse,
Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off
with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024.
Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement
fallback during the primary surface casing by conductor cement job. The remaining void space
between the top of the cement and the top of the conductor is filled with a heavier than water
corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached
spreadsheets include the well names, API and PTD numbers, treatment dates and volumes.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that
the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations.
If you have any additional questions, please contact me at 564-4891 or
oliver.sternicki@hilcorp.com.
Sincerely,
Oliver Sternicki
Well Integrity Supervisor
Hilcorp North Slope, LLC
Digitally signed by Oliver Sternicki
DN: cn=Oliver Sternicki, c=US,
o=Hilcorp North Slope LLC,
ou=PBU,
email=oliver.sternicki@hilcorp.com
Date: 2024.02.09 11:15:58 -09'00'
Oliver
Sternicki
Hilcorp North Slope LLC.
Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor
Top-off
Report of Sundry Operations (10-404)
02/09/2024
Well Name PTD # API #
Initial top
of cement
(ft)
Vol. of
cement
pumped
(gal)
Final top
of cement
(ft)
Cement top
off date
Corrosion
inhibitor
(gal)
Corrosion
inhibitor/ sealant
date
L-293 223020 500292374900 30 8/29/2023
S-09A 214097 500292077101 2 9/19/2023
S-102A 223058 500292297201 2 9/19/2023
S-105A 219032 500292297701 10 9/19/2023
S-109 202245 500292313500 7 9/19/2023
S-110B 213198 500292303002 35 9/19/2023
S-113B 202143 500292309402 10 9/19/2023
S-115 202230 500292313000 4 9/19/2023
S-116A 213139 500292318301 4 9/19/2023
S-117 203012 500292313700 3 9/19/2023
S-118 203200 500292318800 9 9/19/2023
S-122 205081 500292326500 5 9/19/2023
S-125 207083 500292336100 2 9/19/2023
S-126 207097 500292336300 3 9/19/2023
S-134 209083 500292341300 35 9/19/2023
S-200A 217125 500292284601 7 9/19/2023
S-202 219120 500292364700 13 9/19/2023
S-210 219057 500292363000 10 9/19/2023
S-213A 204213 500292299301 4 9/19/2023
S-215 202154 500292310700 3 9/19/2023
S-216 200197 500292298900 4 9/19/2023
S-41A 210101 500292264501 3 9/19/2023
W-16A 203100 500292204501 2 9/23/2023
W-17A 205122 500292185601 3 9/23/2023
Well
Name PTD #API #
Initial top
of
cement
(ft)
Vol. of
cement
pumped
(gal)
Final top
of
cement
(ft)
Cement
top off date
Corrosion
inhibitor
(gal)
Corrosion
inhibitor/
sealant date
W-19B 210065 500292200602 8 9/23/2023
W-21A 201111 500292192901 8 9/23/2023
W-32A 202209 500292197001 4 9/23/2023
W-201 201051 500292300700 44 9/23/2023
W-202 210133 500292343400 6 9/23/2023
W-204 206158 500292333300 3 9/23/2023
W-205 203116 500292316500 3 9/23/2023
W-207 203049 500292314500 3 9/23/2023
W-211 202075 500292308000 8 9/23/2023
W-213 207051 500292335400 3 9/23/2023
W-214 207142 500292337300 10 9/23/2023
W-215 203131 500292317200 2 9/23/2023
W-223 211006 500292344000 7 9/23/2023
Z-69 212076 500292347100 2.0 27 1.5 10/24/2023
S-128 210159 500292343600 11 12/27/2023
S-135 213202 500292350800 16 12/27/2023
V-113 202216 500292312500 24 12/31/2023
V-114A 203185 500292317801 5 12/31/2023
V-122 206147 500292332800 5 12/31/2023
V-205 206180 500292333800 2 12/31/2023
V-207 208066 500292339000 8 12/31/2023
V-214 205134 500292327500 5 12/31/2023
V-215 207041 500292335100 2 12/31/2023
V-218 207040 500292335000 5 12/31/2023
V-224 208154 500292340000 16 12/31/2023
V-225 209118 500292341900 6 12/31/2023
V-01 204090 500292321000 3 1/1/2024
V-02 204077 500292320900 5 1/1/2024
V-04 206134 500292332200 5 1/1/2024
V-102 202033 500292307000 8 1/1/2024
V-104 202142 500292310300 5 1/1/2024
V-220 208020 500292338300 4 1/1/2024
V-04 206134 500292332200 5 1/1/2024
By Samantha Carlisle at 7:58 am, Aug 17, 2022
Image Project Well hiistory File hover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~ ~ - ~~~ ~- Well History File Identifier
Organizing (done) ^ Two-sided III II~III II III II III ^ Rescan Needed III II'lII II II III III
R CAN DIGI AL DATA OVERSIZED (Scannable)
Color Items: Diskettes, No. ~ ^ Maps:
^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by
a Large Scanner
^ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: ~ Maria ~ Date: 1 / ~j-j / [f (_' /s/ u ~ ~ I
ProectProofng IIIIIIINIIIII IIIII
BY: Maria Date: ~ ~ ~! . /s/
Scanning Preparation ~ x 30 = 1~J~? + =TOTAL PAGES
r
BY: Maria ~~~ /~
Date: ~ ~ l.~,
~ /`~.~ (Count does not include cover sheet)
/s/
Production Scanning
Stage 1 Page Count from Scanned File: (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ YES NO
BY: Maria Date: t [ ~G ~~ /s/ Y ~n
Stage 1 If NO in stage 1, page(s) discrepanci//es were found: YES NO 1
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. II I II'I II I II II I I III
ReScanned III IIIIIIIIIII IIIII
BY: Maria
Date:
/s/
Comments about this file:
~_
o~a„„~~e~kea iuiauuuumu
10/6/2005 Well History File Cover Page.doc
Producers with sustained casing pressuon IA during proration • Page 1 of 1
Regg, James B (DOA)
From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com]
Sent: Monday, July 18, 2011 3:53 PM
To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Cismoski, Doug A; Daniel, Ryan;
AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, OPS Prod
Controllers; AK, OPS GC2 OSM; AK, OPS GC2 Ops Lead; AK, OPS GC2 Wellpad Lead; AK, OPS GC2 Field
O &M TL; AK, OPS GC2 OSS; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 OSM; AK, OPS GC1 Field O &M
TL; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS FS1 DS Ops Lead; AK,
OPS FS1 OSM; AK, OPS FS1 Ops Lead; AK, OPS GPMA Field O &M TL; AK, OPS GPMA OSM; AK, OPS
GPMA OSS
Cc: Walker, Greg (D &C); Grey, Leighton (CH2M Hill); Reynolds, Charles (ALASKA); Kaminski, Alice; Warner, Ross
L; Oakley, Ray (PRA); Greaves, Damien C; Brown, Don L.
Subject: Producers with sustained casing pressure on IA during proration
All,
The following producers were reported to have sustained casing pressure on the IA during the proration
and shutdown activity July 15 -18. The immediate action is to perform a TIFL on each of the wells and
evaluate for IA repressurization. If any of the wells fail the TIFL, a follow up email will be sent to the
AOGCC for each individual well.
05-41A (PTD #2031700)
P1 -04 (PTD #1930630)
L -104 (PTD #2012380)
- D #2061340
r' V -103 (PTD #2021860)
W -36 (PTD #1881060) Ad UL 0 2O)'
Y -04 (PTD #1791050)
Y - (PTD #1830490)
All the wells listed above will be re- classified as Not Operable until start -up operations are complete and
stable or the well passes a pressure test proving integrity. After start -up, the wells will then be
reclassified as Under Evaluation with POP parameters to prevent any over - pressure incidents.
Please call with any questions or concerns.
Thank you,
Mehreen Vazir
(Alternate: Gerald Murphy)
Well Integrity Coordinator
BP Alaska Drilling & Wells
Well Integrity Office: 907.659.5102
Email: AKDCWeIIIntegrityCoordinator @BP.com
7/19/2011
-.s~!~~
~"a-f ~.
Fn#
~' + ..~..r ^~ 3~.
~ ~
~T
~,~, ,., xe . ~
'~~ ~~ ~
~. ~ ~ ~;
.~~y
t ~
F H q'h
.MICROFILMED
6/30/2010
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 14, 2009 -
{'d / n R~tdr+r't.~ ^ ~(•` • l _r~ ~~~~
r ;e~~
~J
bp
~~V G~ Y ~~
QCT Q 5 2009
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
~~(8 dl~ 8t G8S ~OnS. GQRtm~~~inn
Anchcr~pa
Subject: Corrosion Inhibitor Treatments of GPB V-Pad pp~,.~ ~~~ 3~
~ ^ ~ ~t
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB V-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my altemate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
• ~
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
V-pad
8/13/2009
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Finai top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
v-01 2040900 50029232100000 NA 2 NA 17 6/30/2009
V-02 2040770 50029232090000 NA 3 NA 43.4 7/11/2009
V-03 2022150 50029231240000 surface NA NA NA NA
V-04 2061340 50029233220000 NA 1.5 NA 20.4 6/29/2009
V-05 2080930 50029233910000 NA 1.75 NA 20.4 5/10/2009
V-07 2071410 50029233720000 NA 0.25 NA t.7 6/29/2009
V-100 2010590 50029230080000 NA 1.5 NA 20.4 5/9/2009
V-101 2020560 50029230740000 NA 3.75 NA 32.3 7/10/2009
V-102 2020330 50029230700000 NA 7.75 NA 98z 8/7/2009
V-103 2021860 50029231170000 NA 0.5 NA 9.4 7/12/2009
V-104 2021420 50029231030000 NA 1.5 NA 21.3 7/11/2009
V-105 2021310 50029230970000 NA 2.25 NA 23.8 6/29/2009
V-106A 2041850 50029230830100 NA 1.75 NA 17 6/29/2009
V-107 2021550 50029231080000 NA 1.75 NA 13.6 7/11 /2009
V-108 2021660 50029231120000 NA 1.5 NA 14.5 7/10/2009
V-109 2022020 50029231200000 NA 1.2 NA 10.2 6/30/2009
V-11t 2031030 50029231610000 NA 1.5 NA 11.9 7/12/2009
V-112 2060200 50029233000000 NA 1.5 NA 15.3 5/10/2009
V-113 2022160 50029231250000 NA 2.5 NA 37.4 5/10/2009
V-114A 2031850 50029231780100 NA 2.5 NA 34 6/30/2009
V-115 2040270 50029231950000 NA 1.5 NA 13.1 5/9/2009
V-117 2030900 50029231560000 NA 125 NA 22.1 5/10/2009
V-119 2040410 50029232010000 NA 2 NA 18.7 6/30/2009
V-120 2041790 50029232250000 NA 1.5 NA 8.5 7/12/2009
V-121 2070360 50029233480000 NA 1.9 NA 17 6/30/2009
V-122 2061470 50029233280000 NA 1.5 NA 6.8 5/10/2009
v-201 2012220 5oo2s23o5aoo00 SC leak NA 4 NA 90.6 8/7/2009
V-202 2030770 50029231530000 NA 1.75 NA 12.8 7/11/2009
V-203 2051680 50029232850000 NA 2 NA 12.8 7/10/2009
v-204 2041310 50029232170000 NA 2 NA 22.1 6/30/2009
V-205 2061800 50029233380000 NA 1.8 NA t3.6 6/30/2009
V-207 2080660 50029233900000 NA 1.75 NA 18.28 1/9/2009
V-210 2042100 50029232310000 NA 2 NA 18.7 7/11/2009
V-211 2042200 50029232320000 NA 1.5 NA 13.6 7/10/2009
V-212 2051500 50029232790000 NA 12 NA 11.9 6/29/2009
V-213 2041t60 50029232130000 NA 1.75 NA 6.3 5/9/2009
V-214 2051340 50029232750000 NA 0.5 NA 9.4 7/11/2009
V-215 2070410 50029233510000 NA 2.8 NA 30.6 6/30/2009
V-216 2041300 50029232160000 NA 1.5 NA 13.6 6/29/2009
V-217 2061620 50029233340000 NA 2.3 NA 25.5 6/30/2009
V-218 2070400 50029233500000 NA 2 NA 17.9 7/12/2009
V-219 2081420 50029233970000 NA 1 NA 16.2 7/12/2009
",-'~^ 2080200 50029233830000 NA 1.75 NA ~5 3/9/2008
V-221 2050130 50029232460000 NA 0.8 NA 8.5 6/29/2009
V-222 2070590 50029233570000 NA 2.5 NA 21.3 7/11/2009
V-223 2080220 50029233840000 NA 2 NA 20.5 9/7/2008
05/14/09
Woll .Inh S
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
1 nn nnsrrintinn
N0.5235
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
nata RI Cnlnr r•_n
i
i
Z-06 AP3Q-00035 STATIC PRESS/TEMP SURVEY 04/25/09 1 1
E-07A AYOO-00022 SCMT
v 04/24!09 1 1
V-04 AWJB-00031 MEM GLS
-( 03/24/09 1 1
Y-16 AZ4D-00015 USIT /~ .-p d Q 05/06/09 1 1
07-16A 62WY-00002 MEM CBL p 04/29/09 1 1
J-O6 ANHY-00009 PRODUCTION PROFILE (3rJ 05/08/09 1 1
R-21 AVY5-00038 LDL / -( / (v 05/02/09 1 1
18-01A B2WY-00003 MEM CBL ~g(p -(~ 05/01/09 1 1
13-03 AYKP-00018 SCMT'-~ ~.- ®(o~ l ®(01 05/01/09 1 1
4-04A/T-30 BOCV-00014 SCMT 04/27/09 1 1
03-09 AXOY-00007 MCNL / ~ p~ ~(~ 12/13/08 1 1
K-16AL2 AXIA-00009 MCNL 01/10/09 1 1
02-13B AWL9-00028 RST 03/26/09 1 1
C-03B AVY5-00040 RST " 05/05/09 1 1
PLEASE ACKNOWLEDGE RECEIPT dY SIGNING AND RETURNING UNE CC7PY E CR TU:
BP Exploration (Alaska) Inc. ~ ~~ `
Petrotechnical Data Center LR2-1 ~ ', - _
900 E. Benson Blvd. v -
Anchorage, Alaska 99508 g~ ZOG~
Date Delivered: g I~
_ tica• gig','t91S5tC
!r
// C4~ICFtC~
I~
Alaska Data & Consulting Services
2525 Gambell Street, to 400
Anchorage, AK~950 - 838
ATTN: Beth
Received by
r1
L.J
~. ~~~~~~
~~
STATE OF ALASKA '
"-`'
.~~R ~ ~
~
M
ALAS
OIL AND GAS CONSERVATION COM
zQQ9
ON
~iaska Oit &
REPORT OF SUNDRY WELL OPERATIONS G
as Con
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ _ Other ~ l1ChOfa
~ +Cft
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver Time Extension ~
Change Approved Program ~ Operat. Shutdown [] Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development - Exploratory ~ 206-1340 -
3. Address: P.O. Box 196612 StratlgraphlC ~~ Service 6. API Number:
Anchorage, AK 99519-6612 50-029-23322-00-00 -
7. KB Elevation (ft): 9. Well Name and Number:
81.4 RT ~ PBU V-04 ,
8. Property Designation: 10. FieldlPool(s): ,
ADLO-028239 ~ PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 14475 - feet Plugs (measured) None
true vertical 8800.2 - feet Junk (measured) None
Effective Depth measured 14385 ~ feet
true vertical 8813.49 - feet
Casing Length Size MD TVD Burst Collapse
Conductor 108 20" 215.5# A-53 SURFACE - 108 SURFACE - 1087
Intermediate 3372 9-5/8" 40# L-80 28 - 3372 28 - 2852 5750 3090
Production 11498 7" 26# L-80 25 - 114980 25 - 8614 7240 5410
Liner 3132 4-1/2" 12.6# 13-CR 11341 - 14473 8502 - 8801 8430 7500
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _ _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13-CR SURFACE - 11356'
0 0 -
Packers and SSSV (type and measured depth) 4-1/2" BKR S-3 PKR 11290
0 0
0 0
0 0
12. Stimulation or cement squeeze summary: ~,
'~~` ~~~~~*~
""~ ~
~
`
Intervals treated (measured):
~°
~` %'
'
`!~"~
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 320 154 158 324
Subsequent to operation: 319 154 158 264
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ~- Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ~ ~ Gas ~ WAG ~ GINJ ~ WINJ ~ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone 564-4944 Date 4/13/2009
Form 10-404 Revised 04/2 0 ~ e~ ~ ~ '' f ~ LQ~g Submit Ori mal Onl
~.~~ ~ ~ `~ ; ~°~.. ~.'~ ~; g' y ~~t Co
V-04
206-134
PERF OTTOC:HMFNT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
V-04 11/30/06 PER 11,870. 12,000. 8,814.79 8,851.67
V-04 11/30/06 PER 12,035. 12,200. 8,858.06 8,870.9
V-04 11/30/06 PER 12,295. 12,400. 8,875.2 8,878.13
V-04 11/30/06 PER 12,670. 12,800. 8,909.49 8,930.74
V-04 11/30/06 PER 13,600. 13,610. 8,925.3 8,923.88
V-04 11/30/06 PER 13,690. 13,765. 8,911.95 8,901.19
V-04 11/30/06 PER 13,795. 13,840. 8,897.06 8,891.48
V-04 11/30/06 PER 13,890. 14,350. 8,885. 8,818.3
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
f~
\J
v-o4
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE SUMMARY
4/5/2009iCTU#6 1.75"CT Job Scope: Mud/HCL Acid Stimulation w/foam diversion.
«<InterAct Publishing»> MIRU Perform weekly BOP test. R/u jet swirl nozzle
sassy ,pumped 270 bbls 3% NH4CL w/F 103 down Coil x Tbg Annulus while rih.
4/6/2009`CTU #6 w/1.75" coil, Job scope -Mud acid job «<Inter ACT publishing»> ...Cont
from WSR 4/5/2009... Started pulling excessive wt 8-10k over pipe wt at 12500' md,
r Decided to pump diesel down annulus while pulling up hole to check for wt
reduction, Power pac overheated and died while pulling up hole. Park at 9897 to fix
reel. After fixing power pac, the gears went out in the reel motor. Everything fixed.
Pump 70bb1's diesel down backside. RIH and did wt checks. At 12500' wt check
(was 40k 15k over normal pickup wt. Talked to APE and decided to PUH to 11500
and pump acid job from there. Pump 40bbls of NH4CL+F103+U067. Pump 80bbls
of NH4CL+F103. Pump 55bbls of 12% HCL. Pump 55b1s of 9:1 Mud Acid. Pump
~20bbls of NH4CL+F103. Pump 6bbls of Oilseeker w/500scf of N2. Circ pressure
ireached 3900psi. Pump 10bbls of NH4CL+F103. Pump 15 bbls Oilseeker, 10 bbls
NH4CL+F-103,Pump 6bbls of Oilseeker w/500scf of N2.Pump 5 bbls
NH4CL+F103, 55bbls 12% HCL, 55 bbls 9:1 Mud Acid,30 bbl NH4CL+F103.
...Job cont on WSR 4/7/2009...
4/7/2009~CTU #6 w/1.75" coil. Job scope -Mud acid «<Inter ACT publishing»> ...Job
continued from WSR 4/6/2009... Finished pumping 30 bbl 3%NH4CL w/F103
overflush.pump 30 bbls 3%NH4CL w/U067, 100 bbls 3% NH4CL w/F-103
displacement. Pump freeze protect down coil, pooh. Normal pulling wt coming off
bottom.Freeze protect flow line w/7 bbls meth, R/d,
~ Move to W-215
j...Job complete...
FLUIDS PUMPED
BBLS
320 3% NH4CL+F103
120 3% NH4CL+F103+U67
72 METH
114 DIESEL
165 12% HCL ACID
165 9:1 MUD ACID
956 Total
DATA SUBMITTAL COMPLIANCE REPORT
10/15/2008
Permit to Drill 2061340 Well Name/No. PRUDHOE BAY UNIT V-04 Operator BP EX PLORATION (ALASKA) INC API No. 50-029-23322-00-00
MD 14475 TVD 8800 Completion Date 12/1/2006 Completion Status 1-OIL Currenf Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD, DIR, GR, RES, PWD, Gyro (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
Tye Med/Frmt Number
- - Name Scale Media No Start Stop CH Received Comments
r
D D Asc
Directional Survey
0 14427 Open
3/13/2007 -~
pt Directional Survey 0 14427 Open 3/13/2007
C Lis 15206 InductionlResistivity 160 14474 Open 6/11/2007 LIS Veri, GR, ROP, FET j
w/Graphics PDF & Txt
~.6g 15206
" Induction/Resistivity 2 Blu 179 14475 Open 6/11/2007 MD Vision Res 28-Nov-
TI 2006
~L'og 15206 Induction/Resistivity 25 Blu 179 14475 Open 6/11/2007 TVD Vision Res 28-Nov-
~~II ~~
Log
~
Pressure
1 Blu 1
9000 12105 Open
10/26/2007 2006
SBHPS, Pres, Temp, CCL,
GR 27-Sep-2007
Well Cores/Samples Inform ation:
Sample
Interval Set
Name Start Stop Sent Received Number Comme nts
ADDITIONAL INFORMATION
Well Cored? Y /~ Daily History Received?
Chips Received? ' / N~ Formation Tops
Analysis ~'Rt-'
Received?
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
10/15/2008
Permit to Drill 2061340 Well Name/No. PRUDHOE BAY UNIT V-04
MD 14475 TVD 8800 ,Completion Date 12/1/2006
Compliance Reviewed By: ___ - ~ \~~__ _______
Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23322-00-00
Completion Status 1-OIL Current Status 1-O/`IL ~ q UIC N
Date: _ lQ__1V c ~ _~_~~
10/25/07
dC~E~~~~I~IPIt
NO.4464
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay, Endicott, Aurora, Milne Pt., Pt. Mac
_u ~..a. X ~ .... new.. ..~:.... n~4n RI Cnlnr Cn
W-19AL1 11890312 SBHP & TEMP `"" 09/29/07
17-19A 11855512 SBHP SURVEY 09/26/07
V-04 11855513 SBHP SURVEY G 09/27/07 1
Z-21A 11594526 SBHP SURVEY 10/07/07 1
Z-03 11767142 LDL 10/01107 1
05-38 11686787 LDL ~ 09127/07 1
Y-29A 11855514 DDL 09/28/07 1
B-16 11676969 PRODUCTION PROFILE _ 10I12I07 1
Z-226 11594525 SBHP SURVEY ---' 10/06/07 1
Z-14B 11849935 SBHP SURVEY (p 10102107 1
P2-45A 11594529 SBHP SURVEY ~ - ~ 10/16/07 1
17-09 11846820 LDL j 'f j ~ - 10/19107 1
F-33 11661176 MEMORY SBHPS (~ - 10/19/07 1
4-08/P-27 11630506 LDL } ~ - 10/04/07 1
3-17F/K-30 11649961 MCNL "~ / 04/17/07 1 1
MPB-50 40011604 OH MWD/LWD EDIT ~ j 02/27/05 2 1
S-125 40015467 OH MWD/LWD EDIT ~ '}_ ~ ~ 07114/07 2 1
PLEASE ACKNOWLEDGE KEGtINT 6Y SIGNING ANU KEI UKNIIVG Vrvt GUYY tAGli 1 V:
BP Exploration (Alaska} Inc.
Petrotechnicai Data Center LR2-1
900 E. Benson Blvd. '
Anchorage, Alaska 99508
~~ ~ ~r-J
Date Delivered: ~~ `' ~~ ~~~~~
Alaska Data 8 Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-28 8
ATTN: Beth j
Received by:
~.",
-. _
Schlam~erger ~~" ;i.~ "~. '
~~~.-~~, 1. ~,i~i:)~
r)~~y~~~4~J~l~~~
;'
Schlumberger-DCS ,~. ~, pis, $
,
°
2525 Gambell St, Suite 400
~
~'
Anchorage, AK 99503-2838 . ~
ATTN: Beth ~'
Well Job #
Log Description
NO. 4292
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Orion
Borealis
Date BL Color CD
V-218 11661147 MEMORY TEMP SURVEY 05178107 1
Z-102
V-04
V-214 11637125
40014377
40014206 CEMENT IMAGE/BOND LOG
OH EDIT MWD/LWD
OH EDIT MWD/LWD 05176/07
11/28/06
10130/06
2
2 1
1
1
L-250 40012593 OH EDIT MWDILWD 11/09/05 2 1
V-722
V-122PB1
V-722PB2 40014531
40014531
40074531 OH EDIT MWD/LWD
OH EDIT MWDILWD
OH EDIT MWD/LWD 12I30/O6
12176106
12128/07 2
2
1 1
1
1
L-250L7 40012593 OH EDIT MWDILWD 11/15/05 1 1
L-250PB1
L-04
OWDW-NW 40072593
40014142
11477941 OH EDIT MWDILWD
OH EDIT MWDILWD
RST 10126/05
10109/06
11/14/06 2
2
1 1
1
1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrofechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Date Delivered:
~~ - 1 ~~(
~ IS~~~
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage,AK 99503-2838
ATTN: Belh
Received by:
osrmro~
c~
R~GG~v~u ~,~
• STATE OF ALASKA MQ~ ~ 2007 ~ s-o7
ALASKA OIL AND GAS CONSERVATION COMMISSION ~, ~,~
WELL COMPLETION OR RECOMPL8~1 ~94#I1pn
AtIChOt8~8 Revised 02/28107: Put on Production
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAa,czs.,os zoAaczs.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
12-3-2006 12. Permit to Drill Number
206-134
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
11-7-2006 ~ 13. API Number
50-029-23322-00-00 ~
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
11-27-2006 14. Well Name and Number:
PBU V-04 '
4863
FSL, 1678
FEL, SEC. 11, T11N, R11E, UM
Top of Productive Horizon:
617' FSL, 5029' FEL, SEC. 35, T12N, R11 E, UM
8. KB Elevation (ft):
81.4 ~
15. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
801' FSL, 2279' FEL, SEC. 34, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD)
14385 + 8813 ~
Ft Pool
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 590622 y- 5970112 Zone- ASP4 10. Total Depth (MD+TVD)
14475 + 8800
Ft 16. Property Designation:
ADL 028239
TPI: x- 587190 y- 5976384 Zone- ASP4
Total Depth: x- 584658 y- 5976539 Zone- ASP4 11. Depth where SSSV set
None MD 17. Land Use Permit:
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD, DIR , GR, RES, PWD, Gyro
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP BOTTOM : TOP BOTTOM SIZE CEMENTING RECORD PULLED:
20" 215.5# A-53 Surface 108' Surface 108' 42" 260 sx Arctic Set A rox.
9-5/8" 40# L-80 28' 3372' 28' 2852' 12-1/4" 518 sx AS Lite 411 sx Class 'G'
7" 26# L-80 25' 11498' 25' 8614' 8-3/4" 555 sx LiteCrete 130 sx Class 'G'
4-1/2" 12.6# 13Cr 11341' 14473' 8502' 8801' 6-1/8" 345 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. TueING RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
2-1/2" Gun Diameter, 4 SPF 4-1/2", 12.6#, 13CR 11356' 11290'
MD TVD MD TVD
11870' - 14350' 8815 - 8818' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 92 Bbls of Diesel
26. PRODUCTION TEST
Date First Production:
February 14, 2007 Method of Operation (Flowing, Gas Lift, etc.):
Gas Lift
Date of Test
2/14/2007 Hours Tested
$ PRODUCTION FOR
TEST PERIOD OIL-BBL
2,095 GAS-MCF
1,689 WATER-BBL
39 CHOKE SIZE
176 GAS-OIL RATIO
806
FIOW TUbing
Press. 680 Casing PreSSUre
1,560 CALCULATED
24-HOUR RATE• OIL-BBL
6,286 GAS-MCF
5,067 WATER-BBL
118 OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
I~~i? ~~ ~ 2DD°t
None
Form 10-407 Revised 12/200 CONTINUED ON REVERSE SIDE
L8. s GEOLOGIC MARKEP~ 29. ORMATION TESTS
Include and briefly summarize test results. list intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Ugnu 3456' 2912' None
Ugnu 'M' 4945' 3958'
Schrader Bluff'N' 5277' 4191'
Schrader Bluff'O' 5507' 4352'
Top of Colville 6023' 4712'
TH RZ 8173' 6230'
TKLB 8455' 6428'
Kuparuk 'D' 8578' 6514'
Kuparuk 'C' 8581' 6516'
Kuparuk 'B' 8803' 6670'
Kuparuk 'A' 8978' 6793'
Top of Miluveach 9080' 6866'
Top of Kingak 10174' 7645'
Top of Sag River 11502' 8617'
Top of Shublik 11559' 8656'
Eileen 11794' 8784'
Top of Sadlerochit 11880' 8818'
Top of Sadlerochit 14376' 8815'
30. List of Attachments:
31. I hereby certify that the fore oing is true and correct to the best of my knowledge.
Signed Terrie Hubble Title Technical Assistant Date ~~~Q
PBU V-04 206-134 Prepared eyName/Number. Terrie Hubble, 564-4628
Well Number Driving Engineer: Brandon Peltier, 564-5912
Permit No. / A royal No.
INSTRUCTIONS
GeNeleA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Irene 20: True vertical thickness.
IreM 22: Attached, supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003 Submit Original Only
~~
STATE OF ALASKA ~ ~ ~ ~ ~ ~ ~~~~
ALASKA AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LO~jaska tail & Gas Cons. Commission
Anchorage
1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAACZS.,os zoAACZS.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
8P Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
a/Z, ~ 12. Permit to Drill Number
206-134
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
11-7-2006 13. API Number
50-029-23322-00-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
11-27-2006 14. Well Name and Number:
PBU V-04
4863
FSL, 1678
FEL, SEC. 11, T11 N, R11 E, UM
Top of Productive Horizon:
617' FSL, 5029' FEL, SEC. 35, T12N, R11 E, UM
8. KB Elevation (ft):
81.4
15. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
801' FSL, 2279' FEL, SEC. 34, T12N, R11E, UM 9. Plug Back Depth (MD+TVD)
14385 + 8813 Ft Pool
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 590622 y- 5970112 Zone- ASP4 10. Total Depth (MD+TVD)
14475 + 8800
Ft 16. Property Designation:
ADL 028239
TPI: x- 587190 y- 5976384 Zone- ASP4
Total Depth: x- 584658 y- 5976539 Zone- ASP4 11. Depth where SSSV set
None MD 17. Land Use Permit:
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD, DIR , GR, RES, PWD, Gyro
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH-TVD HOLE AMOUNT
SIZE WT. PER FT. .GRADE TOP BOTTOM " TOP BOTTOM SIZE CEMENTING RECORD PULLED
20" 215.5# A-53 Surface 108' Surface 108' 42" 260 sx Arctic Set A rox.
9-5/8" 40# L-80 28' 3372' 28' 2852' 12-1/4" 518 sx AS Lite 411 sx Class'G'
7" 26# L-80 25' 11498' 25' 8614' 8-3/4" 555 sx LiteCrete 130 sx la
4-1 /2" 12.6# 13Cr 11341' 14473' 8502' 8801' 6-1 /8" 345 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24: TuswG RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
2-112" Gun Diameter, 4 SPF 4-1/2", 12.6#, 13CR 11356' 11290'
MD TVD MD TVD
11870' - 14350' 8815' - 8$'I $' 25-' AciD, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT 8c KIND OF MATERIAL USED
Freeze Protected with 92 Bbls of Diesel
26. PRODUCTION TEST
Date First Production:
Not On Prodruction Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE .SIZE GAS-OIL RATIO
Flow Tubing
PreSS. Casing Pressure CALCULATED
Z4-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Supaut core ckiips; if none, state "none". ~~ ;~ r X06
LLA~}79.1,~1fLriv ; l1~,.. ,~
None , ~ ~--
I Vim" .~~, ~
Form 10 # i9e~°~12/20~ R ~ G ONTINUED ON REVERSE SIDE
28. ~ GEOLOGIC MARKERS 29. NATION TESTS
Include and briefly summarize test results. List intervals tested,
NnMe MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Ugnu 3456' 2912' None
Ugnu 'M' 4945' 3958'
Schrader Bluff'N' 5277' 4191'
Schrader Bluff'O' 5507' 4352'
Top of Colville 6023' 4712'
TH RZ 8173' 6230'
TKLB 8455' 6428'
Kuparuk 'D' 8578' 6514'
Kuparuk 'C' 8581' 6516'
Kuparuk 'B' 8803' 6670'
Kuparuk 'A' 8978' 6793'
Top of Miluveach 9080' 6866'
Top of Kingak 10174' 7645'
Top of Sag River 11502' 8617'
Top of Shublik 11559' 8656'
Eileen 11794' 8784'
Top of Sadlerochit 11880' 8818'
Top of Sadlerochit 14376' 8815'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, and aLeak-Off Test Summary.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Sondra wma ~ Title Technical Assistant Date ~ ' ~ " ~ ~.D
PBU V-04 206-134 Prepared By Name/Number. Sondra Stewman, 564-4750
Well Number Permit No. / A royal No. Drilling Engineer: Brandon Peltier, 564-5912
INSTRUCTIONS
GeNeRn~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003 Submit Original Only
TREE= 4-1/16" CM/
WELLHEAD = FMC
A~l'UATOR'= LEO
KB. ELEV = 28.5'
BF. ELEV =
KOP = 53.4'
500'
Max Angle = 98 °
Datum MD = @ 14282
12472'
Datum TVD = ~ 8800' SS
9-5/8" CSG, 40#, L-80, BTGM, ID = 8.835" ~ 3372'
Minimum ID = 3.813" @ 2191'
4-112" HES X NIPPLE
•
PJC
DRAFT
V-04
S TES:
-14-1/2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 2674 2351 44 KGB2 DMY SBK2 0 12!02!06
5 4629 3739 46 KG62 DMY SBK2 0 12/02/06
4 6458 5021 45 KGB2 DCK2 BEK 0 12/02/06
3 7869 6023 49 KGB2 DMY SBK2 0 12!02!06
2 9282 7012 45 KGB2 DMY SBK2 0 12!02/06
1 10654 8003 40 KG62 DMY SBK2 0 12/02/06
~ HES ES CEMENTER, ID = 6.188" ~
11269' ~4-1/2" HES X NIP, ID = 3.813" I
11290' 7" X 4-1/2" BKR S-3 PKR, ID = 3.870"
11313' 4-1/2" HES X NIP, ID = 3.813"
11334' 4-1/2" HES X NIP, ~ = 3.813"
4-1/2" TBG, 12.6#, 13 - CR VAM TOP 11356' 11341' 7" X 5" BKR HRD ZXP LTP
.0152 bpf, ID = 3.958" I w !TIEBACK SLV, ID = 5.250"
11356' 4-1/2" WLEG, ID = 4.00"
7" CSG, 26 #, L-80, TGII, ID = 6.276" 11498'
11365'
5" X 4-1/2" XO, ID = 3.950"
PERFORATION SUMMARY
REF LOG: ????
ANGLE AT TOP PERF: 69° @ 11870
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 11870 - 12000 O 12/01/06
2-112" 4 12035-12200 O 12/01/06
2-1/2" 4 12295-12400 O 12/01/06
2-1 /2" 4 12670 - 12800 O 12101 /06
2-1l2" 4 13600 - 13610 O 12/01/06
2-1/2" 4 13690 - 13765 O 12/01/06
2-1/2" 4 13795 - 13840 O 12/01/06
2-1/2" 4 13890-14350 O 12/01/06
PBTD 143$5' ---
4-1/2" LNR, 12.6#, 13-CRVAM TOP, 14473'
.0152 bpf, ID = 3.958'
DATE REV BY COMMENTS DATE REV BY COMMENTS
12/05/06 N9ES INITIAL COMPLETION
12110/06 ?I PSC DRLG DRAFT CORRECTK7NS
PRUDHOE BAY UNIT
WELL: V-04
PERMff No: 2061340
API No: 50-029-23322-00
SEC. 11, T11 N, R11 E, 4963' FSL, 1678' FEL
BP Exploration (Alaska)
s
s
BP EXPLORATION
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 9ES
I
Date ~ From - To Hours Task , Code ~ NPT
11/6/2006 12:00 - 18:00 ~ 6.001 MOB
Start: 11/6/2006
I Rig Release: 12/3/2006
Rig Number:
Page 1 of 18 ~
Spud Date: 11/7/2006
End:
Phas~ Description of Operations
PRE ~ Turnkey Rig Move f/ V-214i to V-04, same pad, well to well,
18:00 - 00:00 6.00 RIGU P PRE
11/7/2006 00:00 - 01:30 1.50 RIGU P PRE
01:30 - 04:30 3.00 RIGU P PRE
04:30 - 06:30 2.00 RIGU P PRE
06:30 - 07:00 0.50 RIGU P PRE
07:00 - 09:30 2.50 DRILL P SURF
09:30 - 10:00 ~ 0.50 ~ DRILL ~ P ~ ~ SURF
10:00 - 10:30 I 0.501 DIVRTR I P I I SURF
10:30 - 11:00 0.50 DRILL P SURF
11:00 - 11:30 0.50 DRILL P SURF
11:30 - 12:00 I 0.501 DRILL I P I I SURF
12:00 - 00:00 I 12.00 t DRILL I P I I SURF
11/8/2006 100:00 - 02:30 I 2.501 DRILL I P I I SURF
02:30 - 03:30 I 1.001 DRILL I P I I SURF
03:30 - 04:00 I 0.501 DRILL I P I I SURF
04:00 - 04:30 0.50 DRILL P SURF
04:30 - 05:30 1.00 DRILL P SURF
05:30 - 06:00 0.50 DRILL P SURF
06:00 - 06:30 0.50 DRILL P SURF
06:30 - 07:00 0.50 DRILL P SURF
07:00 - 07:30 0.50 DRILL P SURF
07:30 - 08:30 1.00 DRILL P SURF
08:30 - 12:00 3.501 DRILL I P I (SURF
PJSM w/ Peak, Move pits, pull rig off V-2141, move and spot
over V-04, spot pits, hook up inner connect lines, cutting tank,
RU riser, take on FW in pits, Accept Rig at 1800 hours on
11 /06/06
Load Pipeshed, strap DP, Hwt and BHA, mixing spud mud
Build spud mud, load pipeshed, strapping DP, HWT and BHA,
Berm cellar area.
PU 75 joints of 4" HT40 DP and stand back in the derrick 25
stands.
PU 24 joints of 4" HW DP, Jar stand and stand back in derrick.
Prepare rig floor to pick up BHA
PJSM. Make up BHA #1 with 12.25" RR HTC MXL-01 bit, 1.83
deg PDM, LC, NM STAB, MWD, NM STAB, NM XO, UBHO,
and 3 ea NM DC's.
PJSM with Gyro Data and Sperry E-line. Hang sheave in
derrick and rig up gyro tools.
Function test diverter system and accumulator. Witnessing of
test waived by AOGCC rep John Spalding. Test witnessed by
BP WSL Alan Madsen and NAD TP Kelly Cozby.
Hold Pre-Spud meeting with rig crew and contractors.
Fill mud lines and conductor pipe. Check for leaks - OK. Test
mud surface equipment to 3,000 psi - OK.
Wash pile driven conductor from 105' to 179'. 660 gpm, 800
psi, 62 rpm, 560 TO, PU / SO - 50k.
Spud V-04 12.25" surface hole from 179' to 1,293'. Gyro
surveyed hole every 100' to 1,007'. 600 gpm, 1,740 psi on,
1,645 psi off, 60 rpm, 4.2k TO on, 2.2k TO off, PU - 75k, SO -
68k, RWT - 70k, WOB - 5-20k. AST - 2.20 hrs, ART - 3.63 hrs.
Wipe 30' prior to connections. *Crew held Pre-Spud meeting
during the PTSM*
Directionally drill 12.25" surface hole from 1,293' to 1,580'. 600
gpm, 1,940 psi on, 1,810 psi off, 60 rpm, 4k TO on, 2.3k TO
off, PU - 75k, SO - 72k, RWT - 73k, WOB - 30k. AST - 1.16
hrs, ART - .86 hrs. Wipe 30' prior to connections. Survey
every 90'.
Circulate 3 bottoms up. 600 gpm, 1,730 psi, 60 rpm, 2.2k TO,
PU - 75k, SO - 72k, RWT - 73k, MW - 9.1 ppg.
POH for bit without problem from 1,580' to 1,006'. PU - 82k,
SO - 75k.
Stand back HWDP from 1,006' to 270'.
Stand back Jar stand and drill collar stand.
Clear and clean rig floor.
Break and change out bit to RR MXL-1. Adjust motor bend
from 1.83 deg to 1.5 deg.
Service topdrive and crown.
Pick up drill collar and Jar stands.
Run in hole with BHA #2 from 268' to 1,482' without problem.
Wash last stand down to bottom C 1,580'.
Directionally drill 12.25" surface hole from 1,580' to 2,248'. 700
gpm, 2,575 psi off/on, 80 rpm, 5.4k TO on, 1.9k TO off, PU -
85k, SO - 74k, RWT - 75k, WOB - 30k. AST - 1.13 hrs, ART -
.80 hrs. Wipe 60' prior to connections. Survey every 90'.
Printed: 12/4/2006 10:09:56 AM
• •
BP EXPLORATION
Page 2 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04
Event Name: DRILL+COMPLETE
Contractor Name: NABORS ALASKA DRILLING
Rig Name: NABORS 9ES
Date From - To ! Hours j Task Code NPT
11/8/2006 ~ 12:00 - 18:30 ~ 6.501 DRILL P
18:30 - 20:00 I 1.501 DRILL I P
20:00 - 21:30 1.501 DRILL P
21:30 - 22:30 I 1.001 DRILL I P
22:30 - 00:00 I 1.501 DRILL I P
11/9/2006 100:00 - 00:30 I 0.501 DRILL I P
00:30 - 02:00 I 1.501 DRILL ( P
02:00 - 04:00 2.00 DRILL P
04:00 - 05:00 1.00 DRILL P
05:00 - 07:00 2.00 DRILL P
07:00 - 07:30 0.50 DRILL P
07:30 - 10:00 2.50 CASE P
10:00 - 17:30 I 7.501 CASE I P
Spud Date: 11 /7/2006
Start: 11 /6/2006 End:
I Rig Release: 12/3/2006
Rig Number:
Phase ~ Description of Operations
SURF Directionally drill 12.25" surface hole from 1,580' to TD
3,385' MD, 2,862' TVD. 700 gpm, 3,245 psi on, 3,220 psi off,
80 rpm, 6.7k TO on, 3.5k TO off, PU - 95k, SO - 70k, RWT -
76k, WOB - 30k. AST - 1.51 hrs, ART - 2.52 hrs. Wipe 60'
prior to connections. Survey every 90'. *Small amount of
hydrates came in ~ 2,250'.
SURF Circulate 3 bottoms up. 700 gpm, 3,240 psi, 100 rpm, 3.8k TO,
PU - 95k, SO - 70k, RWT - 76k, MW - 9.4 ppg, 240 viscosity.
SURF POH for wiper trip from 3;385' to 2,056' with intermittent 10-20k
drag. Started swabbing @ 2,056'. Attempted to work pipe
without swabbing with negative effect.
SURF Backream out of hole from 2,056' to 1,575'. Pulled 1 more
stand without pumping to 1,482' without problem. 700 gpm,
2,230 psi, 80 rpm.
SURF Run back in hole from 1,482' to 2,917' without pumping. Had
occasional down drag from 2,079' to 2,917'. Worked through
all drag areas to clean them up.
SURF Continue wiper trip in hole from 2,917' to 3,299' wiping out any
excess drag. Precautionary washed down last stand to bottom
at 3,385'.
SURF Circulate 2 bottoms up. Shakers clean. 715 gpm, 3,150 psi,
100 rpm, 4k TO, PU - 95k, SO - 70k, RWT - 76k, MW - 9.5
ppg, Vis - 225, YP - 55.
SURF Monitor well - OK. PU - 107k, SO - SOk. POH to run surface
casing from 3,385' to 1,004' without problem.
SURF Stand back HW DP, Jar and DC stands from 1,006' to 77'.
SURF PJSM. Laydown BHA #2: MW D, motor and bit. Bit grade: 0 -
1 -CT-M-E-IN-NO-TD
SURF Clear and clean rig floor.
SURF Rig up to run surface casing. Make dummy run with hanger
and landing joint.
SURF PJSM. Pick up and Baker-Lok 9 5/8" shoe track. Check floats
- OK. Run in hole with 82 joints 9 5/8" 40# L-80 BTC surface
casing. Make up torque - 9,400 ft/Ibs avg. using Best-O-Life
2000 NM. Ran 25 bowspring centralizers on first 25 joints with
2 locked down 10 ff above Float Shoe and Float Collar. Fill
every joint with casing fill-up tool. Had intermittent 10-20 drag.
Precautionary washed down last 5 joints to casing depth of
3,372' C~3 3 bpm, 640 psi. No mud lost on trip in hole.
Float Shoe ~ 3,372'
Float Collar C~ 3,289'
17:30 - 18:30 1.00 CEMT P SURF Stage pumps up to 8 bpm, 625 psi and circulate bottoms up 2
times with Franks tool, working pipe in 12 ft strokes. PU -
155k, SO - 95k.
18:30 - 19:00 0.50 CEMT P SURF Rig down Franks tool and rig up cement head and hose.
19:00 - 20:00 1.00 CEMT P SURF Continue conditioning mud for cement job ~ 8 bpm, 500 psi.
MW - 9.5 ppg, Vis - 57, YP - 15. Held cement job PJSM while
circulating.
20:00 - 23:00 3.00 CEMT P SURF Shut down pumps and switch to Dowell. Pump 5 bbls water
and test lines to 3,500 psi - OK. Pump 69 bbls of 10.3 ppg
MudPush II spacer ~ 5 bpm avg, 156 psi ICP, 119 psi, FCP.
Drop bottom plug, pump 414 bbls of 10.7 ppg ArcticSet
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION Page 3 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase j Description of Operations
11/9/2006 ~ 20:00 - 23:00 3.00 CEMT CP
23:00 - 00:00 1.00 CEMT P
11/10/2006 00:00 - 04:00 4.00 DIVRTR P
04:00 - 05:30 1.50 WHSUR P
05:30 - 09:30 4.00 BOPSU P
09:30 - 13:00 3.50 BOPSU P
13:00 - 14:00 1.00 BOPSU P
14:00 - 18:30 4.50 DRILL P
18:30 - 20:00 1.50 DRILL P
20:00 - 00:00 4.00 DRILL P
11/11/2006 00:00 - 01:30 1.50 DRILL P
01:30 - 02:30 1.00 DRILL P
02:30 - 04:00 1.50 DRILL P
04:00 - 04:30 0.50 DRILL P
04:30 - 05:30 1.00 DRILL P
05:30 - 06:00 0.50 DRILL P
06:00 - 06:30 0.50 DRILL P
06:30 - 08:00 1.50 DRILL P
08:00 - 08:30 I 0.501 DRILL I P
SURF LiteCrete cement ~ 5 bpm avg, 124 psi ICP, 284 psi FCP.
Pump 85 bbls of 15.8 ppg Class "G" cement ~ 5 bpm avg, 398
psi ICP, 211 psi FCP. Drop top plug and kick out same with 10
bbls of water. Switch to rig pump and displace cement with
240 bbls of 9.5 ppg mud @ 6 bpm, 200 psi ICP, 810 FCP.
Slowed pump to 2 bpm, 565 psi and landed casing on ring 5
bbls prior to bumping plug. Bump plug on schedule @ 96%
efficiency with 1,100 psi. CIP C~ 23:00 hr. Bleed off pressure
and check floats - OK. Reciprocated casing throughout job and
had full returns during all of circulating cementing and
displacement.. Returned 175 bbls of sidewalk cement back to
surface. Calculated hole washout - 64%. PU - 125k, SO - 60k
prior to landing casing.
SURF Rig down cement head, flush riser, and laydown landing joint.
SURF Nipple down surface diverter. Clean out cellar box. Remove 4"
valves from conductor. Nipple down dresser sleave and riser,
remove same from cellar. Change out drilling nipple from 20"
to 16". Clean out rotary drain pan. Remove surface hydril from
well and secure in cellar.
SURF Prepare casing head and install same. Test metal to metal
seal to 1,000 psi - 10 minutes - OK. Torque tubing head to
casing head bolts.
SURF Nipple up BOPE.
SURF Rig up and pressure test BOPE to 250 low psi for 5 minutes
each, 4,000 high psi for 5 minutes each. Test annular
preventer to 250 low psi for 5 minutes, 3,500 high psi for 5
minutes. Perform accumulator drill (D4). Test witnessed by
AOGCC rep Jeff Jones, BP WSL Alan Madsen, NAD TP Bill
Bixby.
SURF Rig down test equipment, install wear bushing, laydown test
joint and blowdown lines.
INTt Pick up 4" drill pipe singles needed to TD intermediate hole out
of pipe shed to 3,025'.
INT1 POH standing back drill pipe from 3,025' to surface.
INT1 Pick up 4" drill pipe singles needed to TD intermediate hole out
of pipe shed to 3,025'.
INT1 POH standing back drill pipe from 3,025' to surface.
INT1 Pick up 12 joints drill pipe and stand back 4 stands.
INT1 PJSM. Pick up and make up BHA #3: New 8 3/4 Hycalog
DTX619M, 1.5 deg PDM, FS, NM STAB, LWD/ARC, MWD, NM
DC, NM STAB, tea NM DC's, Saver Sub, 1 ea 5" HWDP, JAR,
lea 5" HWDP, XO, 24 ea 4" HWDP.
INT1 Attempt to shallow hole test MWD. 504 gpm, 1,030 psi. Bad
signal due to depth and mud pump pulsation dampener
pressure setting ~ 1,200 psi.
INT1 Run in hole with BHA #3 picking up drill pipe out of pipe shed
from 1,008'to 1,964'.
INT1 Shallow hole test MWD - OK. 519 gpm, 1,460 psi.
INT1 Service topdrive and rig.
INT1 Continue running in hole picking up drill pipe out of pipe shed
from 1,964' to 2,921'. Run in hole with 3 stands out of derrick
to 3,202'. Fill pipe and clear air out of system.
INT1 Pressure test 9 5/8" 40# L-80 BTC casing to 3,500 psi for 30
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION Page 4 of 18
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name:
ell Name:
e:
Name:
From - To V-04
V-04
DRILL+C
NABOB
NABOB
Haurs
OMPLE
S ALASK
S 9ES
Task ;
TE
A DRI
Code
LING
NPT
Start
1 Rig
Rig
Phase i
Spud Date: 11/7/2006
: 11/6/2006 End:
Release: 12/3/2006
Number:
Description of Operations
11/11/2006 08:00 - 08:30 0.50 DRILL P INTi minutes - No pressure loss.
08:30 - 10:00 1.50 DRILL P INT1 Drill out float collar on depth C~3 3,289'. Continue drilling out
cement and shoe to 3,372'. 577 gpm, 1,360 psi, 60 rpm, 5k
TO on, 5.5k TO off. Started displacing old mud with 8.8 ppg
LSND mud 10 ft. prior to drilling out shoe.
10:00 - 10:15 0.25 DRILL P INT1 Clean out rat hole from 3,372' to 3,385'. 580 gpm, 1,440 psi,
60 rpm, 5k TO on 4.5k TO off.
10:15 - 10:30 0.25 DRILL P INT1 Drill 20' of new hole from 3,385' to 3,405'. 580 gpm, 1,440 psi,
60 rpm, 5k TO on 4.5k TO off.
10:30 - 11:30 1.00 DRILL P INT1 Perform LOT. MD - 3,372', ND - 2,853', MW - 8.8 ppg, TP -
720 psi = EMW - 13.65 psi
11:30 - 12:00 0.50 DRILL P INT1 Obtain benchmark ECD's and slow pump rates. 597 gpm,
1,228 psi, 80 rpm - 9.51 ppg Calc ECD.
12:00 - 00:00 12.00 DRILL P INTi Directionally drill 8.75" intermediate hole from 3,405' to 5,915'.
585 gpm, 2,850 psi on, 2,480 psi off, 80 rpm, 7k TO on, 6k TO
off, PU - 140k, SO - 90k, RWT - 110k, WOB - 10k. AST - 2.05
hrs, ART - 4.63 hrs, CECD - 9.8 ppg, AECD - 10.5 ppg.
Backream 90' prior to connections. Survey every 90'. Pumped
tea 1.5 ppg over, weighted sweeps, 1 ~ 4,086', and 1 ~
5,614', with no visible increase in cuttings when back to
surface. Heavy oil returned to surface from the UG4A and M
sands. 'Picked up ghost reamer @ 5,597'.
11/12/2006 00:00 - 03:00 3.00 DRILL P INT1 Directionally drill 8.75" intermediate hole from 5,915' to 6,368'.
585 gpm, 3,150 psi on, 2,805 psi off, 80 rpm, 8k TO on, 5k TO
off, PU - 145k, SO - 93k, RWT - 115k, WOB - 20k, CECD -
9.96 ppg, AECD - 10.79 ppg. Backream 90' prior to
connections.
03:00 - 03:30 0.50 DRILL P INT1 Circulate for ECD's. 585 gpm, 2,800 psi, 80 rpm, 5k TO,
CECD - 9.96 ppg, initial AECD - 10.79 ppg, final AECD - 10.53
PP9•
03:30 - 12:00 8.50 DRILL P INT1 Directionally drill 8.75" intermediate hole from 6,368' to 7,092'.
585 gpm, 3,270 psi on, 2,930 psi off, 80 rpm, 8k TO on, 7k TO
off, PU - 140k, SO - 90k, RWT - 110k, WOB - 40k, CECD -
9.96 ppg, AECD - 10.26 ppg, AST - 1.08 hrs, ART - 7.26 hrs.
Backream 90' prior to connections.
12:00 - 21:30 9.50 DRILL P INT1 Directionally drill 8.75" intermediate hole from 7,092' to 8,086'.
585 gpm, 3,592 psi on, 3,172 psi off, 80 rpm, 8.5k TO on, 7k
TO off, PU - 163k, SO - 112k, RWT - 129k, WOB - 10-40k,
CECD - 9.96 ppg, RECD - 10.36 ppg. Backream 90' prior to
connections. Start adding 14 ppg spike mud to system ~
20:45 hr.
21:30 - 22:30 1.00 DRILL P INT1 Continue add spike mud to system and circulate a 10.7 ppg
mud weight to surface prior to connection @ 8,086' MD, 6,165'
TVD. 585 gpm, 3,639 psi FCP, 80 rpm, 6.2k TO. Obtain new
slow pump rates. CECD - 11.46 ppg
22:30 - 00:00 1.50 DRILL P INT1 Directionally drill 8.75" intermediate hole from 8,086' to 8,277'.
525 gpm, 3,571 psi on, 3,205 psi off, 80 rpm, 8k TO on, 7k TO
off, PU - 162k, SO - 111 k, RWT - 129k, WOB - 40k, CECD -
11.46 ppg, AECD - 12.00 ppg, AST - 3.2 hrs, ART - 4.67 hrs.
Backream 90' prior to connections. Top of HRZ G 8,173'.
11/13/2006 00:00 - 12:00 12.00 DRILL P INT1 Directionally drill 8.75" intermediate hole from 8,277' to 9,381'.
525 gpm, 3,870 psi on, 3,690 psi off, 80 rpm, 7.4k TO on, 6.6k
TO off, PU - 181 k, SO - 115k, RWT - 141 k, WOB - 40k, CECD
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION Page 5 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To ! Hours j Task Code NPT Phase
- ---
11/13/2006 100:00 - 12:00 I 12.00 ~ DRILL I P I INT1
12:00 - 17:00 I 5.00 ~ DRILL ~ P I I INT1
17:00 - 18:30 1.50 DRILL N RREP INT1
18:30 - 00:00 5.50 DRILL P INT1
11/14/2006 100:00 - 02:30
02:30 - 09:00
09:00 - 12:00
12:00 - 00:00 I 12.001 DRILL I P
11/15/2006 100:00 - 12:00 I 12.001 DRILL I P
2.501 DRILL I P I I INT1
6.501 DRILL I N
3.001 DRILL I P
RREP IINT1
INT1
INTi
INTi
Description of Operations
- 11.44 ppg, AECD - 11.54 ppg, AST - 1.20 hrs, ART - 6.99 hrs.
Backream 90' prior to connections.
Directionally drill 8.75" intermediate hole from 9,381' to 9,700'.
525 gpm, 3,870 psi on, 3,695 psi off, 80 rpm, 11 k TO on, 10k
TO off, PU - 195k, SO - 119k, RWT - 144k, WOB - 40k, CECD
- 11.44 ppg, AECD - 11.54 ppg. Backream 90' prior to
connections. 'C~ 9,425', 13:30 hrs, pumped a 30 bbl high vis
sweep with 2 sacks of Nut Plug Coarse. Set bit on bottom with
2-3k weight on bit and allowed sweep to exit bit. ROP
increased from 30 fph to 200 fph. Blow pop-off valve on #2
mud pump.
Circulate and reciprocate while working on pop-off valve.. 247
gpm, 1,100 psi, Pop-off would not reset. Replaced valve.
Directionally drill 8.75" intermediate hole from 9,700' to 10,018'.
525 gpm, 3,836 psi on, 3,518 psi off, 80 rpm, 11 k TO on, 10k
TO off, PU - 207k, SO - 115k, RWT - 148k, WOB - 40k, CECD
- 11.44 ppg, AECD - 11.54 ppg, AST - 2.80 hrs, ART - 4.21 hrs.
Backream 90' prior to connections. 'Started mud weight-up
9,900', 20:45 hr with 12.4 ppg spike fluid. Had 11.2 ppg
mud back to surface @ 9,993', 23:00 hr. CECD - 11.89 ppg,
AECD - 12.06 ppg. Added 350 gallons of LOW TORO for
concentration of 2.5-3% in system. Torque reduced by 3k.
Directionally drill 8.75" intermediate hole from 10,018' to
10,132'. 525 gpm, 3,900 psi on, 3,780 psi off, 80 rpm, 10k TO
on, 9k TO off, PU - 200k, SO - 118k, RWT - 155k, WOB - 15k,
CECD - 11.89 ppg, AECD - 11.97 ppg. Backream 90' prior to
connections.
Repair pressure relief valve on rig mud pump. Change out
valve with backup. Failed to operate properly. Change backup
pressure relief out to backups backup. Failed test. Continue to
work on pressure relief valves, trying all combinations of
original parts, backup valve and the backup for the backup until
one passed the bench test. Installed tested assembly back on
mud pump and prepare to drill ahead. 'Circulated with one
pump @ 289 gpm, 1,445 psi, 80 rpm, 9k TO.
Directionally drill 8.75" intermediate hole from 10,132 to
10,217'. 520 gpm, 3,810 psi on, 3,650 psi off, 80 rpm, 10.5k
TO on, 9k TO off, PU - 205k, SO - 120k, RWT - 152k, WOB -
15k, CECD - 11.89 ppg, AECD - 11.79 ppg, AST - 2.83 hrs,
ART - .78 hrs. Backream 90' prior to connections. '10,168',
11:00 hr, pumped a 30 bbl high vis sweep with 10 sacks of
Nutplug Coarse and set balled bit on bottom with 2-3k, 80 rpm
when sweep exited bit. Pumped sweep around bit ~ 524 gpm,
4,090 psi
Directionally drill 8.75" intermediate hole from 10,217' to
10,725'. 520 gpm, 3,913 psi on, 3,725 psi off, 80 rpm, 10.5k
TO on, 8.9k TO off, PU - 203k, SO - 127k, RWT - 152k, WOB -
15k, CECD - 11.89 ppg, AECD - 12.08 ppg, AST - 4.43 hrs,
ART - 3.32 hrs. Backream 90' prior to connections.
Directionally drill 8.75" intermediate hole from 10,725' to
11,257'. 520 gpm, 4,175 psi on, 3,780 psi off, 80 rpm, 9.6k TO
on, 8k TO off, PU - 212k, SO - 132k, RWT - 164k, WOB - 15k,
CECD - 11.89 ppg, AECD - 12.41 ppg. Backream 90' prior to
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION Page 6 of 18
Operations Summary Report
Legal Well Name: V-04
Common W ell Name: V-04 Spud Date: 11/7/2006
Event Nam e: DRILL+C OMPLE TE Start : 11/6/2006 End:
Contractor Name: NABOR S ALAS KA DRI LLING I Rig Release: 12/3/2006
Rig Name: NABOR S 9ES Rig Number:
~
Date
~ From - To
_ Hcurs Task ~ Code NPT Phase Description of Operations
11/15/2006 00:00 - 12:00 12.00 DRILL P INT1 connections.
12:00 - 17:30 5.50 DRILL P INT1 Directionally drill 8.75" intermediate hole from 11,257' to
11,495'. 520 gpm, 4,030 psi on, 3,910 psi off, 80 rpm, 8.9k TO
on, 7.7k TO off, PU - 207k, SO - 132k, RWT - 162k, WOB -
10k, CECD - 11.89 ppg, AECD - 11.99 ppg. Backream 90'
prior to connections.
17:30 - 19:00 1.50 DRILL P INT1 Circulate for samples. 530 gpm, 4,150 psi, 80 rpm, 8.6k TO,
CECD - 11.90 ppg, AECD - 11.95 ppg.
19:00 - 21:00 2.00 DRILL P INT1 Drill 5' to TD ~ 11,500' MD, 8,615' TVD. Circulate for samples
to confirm TD. 530 gpm, 4,070 psi, 80 fpm, 7.8k TQ, CECD -
11.90 ppg, AECD - 11.92 ppg. 'Estimated top of Sag - 11,492'.
21:00 - 22:30 1.50 DRILL P INT1 Monitor well - OK. 11.2 ppg MW. Start wiper trip to shoe. PU
- 232k, SO - 141 k. POH without pumping from 11,500' to
10,363'. (TKNG - 10,174') Pulled 25k over ~ 10,363' and was
swabbing.
22:30 -00:00 1.50 DRILL P INT1 Backream from 10,363' to 9,790'. 525 gpm, 3,750 psi, 100
rpm, 8.2k TO, RWT - 152k, CECD - 11.90 ppg, AECD - 12.36
ppg. Worked through tight spot ~ 9,800' with minor packing
off. Cleaned up OK. Running speed dictated by keeping
ECD's less than .6 ppg over calculated.
11/16/2006 00:00 - 12:00 12.00 DRILL P INT1 Backream from 9,790' to 8,630' bit depth, Ghost reamer
3,030'. 525 gpm, 3,345 psi, 100 rpm, 6.9k TO, RWT - 133k,
CECD - 11.83 ppg, AECD - 12.20 ppg. Running speed
dictated by pack-offs and keeping ECD's less than ,6 ppg over
calculated. Any faster than 4 fpm results in partial pack-offs
and ECD spikes. At 8,600', hole packed off and lost 23 bbls.
Worked string down and regained full circulation36 bbl mud
loss for tour.
12:00 - 15:00 3.00 DRILL P INT1 Backream from 8,630' to 8,438' bit depth, Ghost reamer
2,830'. 500 gpm, 3,080 psi, 100 rpm, 6.9k TO, CECD - 11.83
ppg, AECD - 12.20 ppg. Change parameters around from
300-500 gpm to control pack-offs, 90-115 gpm with no change
in results. Running speed dictated by pack-offs and keeping
ECD's less than .6 ppg over calculated. Attempts at increasing
pulling speeds were unsuccessful. Any faster than 3 fpm
resulted in partial pack-offs, torque and ECD spikes.
15:00 - 19:00 4.00 DRILL P INT1 Attempt to pull pipe ~ 8,438' without pumping. PU - 175k, SO
- 115k, 25-30k overpull with swabbing. Continue backreaming
from 8,438' to 8,150' bit depth, Ghost reamer C~3 2,838'. THRZ
- 8,173'. 450 gpm, 2,680 psi, 90 rpm, 6.3k TO, CECD - 11.83
ppg, AECD - 12.20 ppg. Pumped 30 bbls SAP sweep C~3
8,240' with no change in parameters.
19:00 - 00:00 5.00 DRILL P INT1 Bring pump rate up to 590 gpm. Backream from 8,150' to
7,513' bit depth, Ghost reamer @ 1,913'. 3,830 psi, 90 rpm,
6.4k TO, 125k RWT, CECD - 11.86 ppg, AECD 12.45 ppg.
Same reactions with speed /torque /pack-offs /ECD spike
ratios. Shakers remained the same all day with small amount
of clay across shakers. Pumped 35 bbl high vis sweep while
backreaming @ 7,974'. Stopped reaming while sweep was
exiting bit and going across Ghost reamer. No indications that
sweep brought any cuttings uphole while pumping. Observed
sweep at surface, but no extra cuttings. Lost 25 bbls from
noon to midnight.
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION Page 7 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To Hours ~ Task Code NPT ~ Phase i Description of Operations
11/17/2006 00:00 - 10:30 10.50 DRILL P INT1 Backream from 7,513' to 6,881' bit depth, Ghost reamer @
1,281'. Started gradual mud loss ~ 7,500'. Reduce pump rate
from 590 gpm to 525 gpm, 3,175 psi, 90 rpm, 6k TO, 120k
RWT, CECD - 11.85 ppg, AECD 12.3 ppg. Started mixing in
MIX II MED slowly for mud losses. Loss rate increased with
pulling speed. Slow pulling speed and reduce pump rate to
500 gpm f~? 7,265', 2,900 psi to slow losses. Lost 62 bbls from
midnight to 06:00, stopped losing mud. Pumped a 15 bbl H2O
Low vis / 35 bbl 12.7 ppg High vis weighted sweep ~ 7,035'
with a 50% increase in cuttings with sweep back to surface.
Lost 700 psi after sweep. Lost 400 psi more while reaming.
Check out surface equipment - OK. Shut down reaming
6,881'.
10:30 - 13:30 3.00 DRILL P INT1 Attempt to POH, looking for washout without pumping - No Go.
Pump out of hole at reduced rate of 195 gpm, 420 psi from
6,881' to 6,350'. Worked pipe up with 30-40k overpulls and
pack-offs, needing JAR down action when unable to go back
down after pulling over. Found wash out just below tool joint,
6,368' back from bit. Joint was washed 1/2 way around.
Laydown joint and replace same.
13:30 - 22:00 8.50 DRILL P INT1 Continue backreaming from 6,350' to 4,733'. 525 gpm, 3,000
psi, 95 rpm, 5.5k TO. Pumped a 15 bbl H2O Low vis / 35 bbl
12.7 ppg High vis, weighted sweep @ 6,177' with a 15%
increase in cuttings with sweep back to surface. CECD - 11.86
ppg, AECD 12.06 ppg. Hole reactions remained the same as
far as pulling speed until one stand before the Ghost reamer
was layed down. Backreamed from 5,600' to 4,733' C~? 350'+
per hour without problem. CECE - 11.85 ppg, AECD - 11.70
PPg•
22:00 - 23:00 1.00 DRILL P INT1 POH from 4,733' to 3,303' without problem. 11.1 ppg mud
weight.
23:00 - 23:30 0.50 DRILL P INT1 Circulate bottoms up ~ 585 gpm, 2,450 psi, 100 rpm, 2.4k TO.
Very little cuttings returned on bottoms up.
23:30 - 00:00 0.50 DRILL P INT1 Service topdrive, blocks, and crown.
*No mud loss for tour, 62 bbl loss for day.
11/18/2006 00:00 - 00:30 0.50 DRILL P INTi Cut and slip drilling line. 'Discussed the Milne Point incident
with crew that arrived today with BP WSL and NAD TP during
Pre Tour Safety Meeting.
00:30 - 02:00 1.50 DRILL P INT1 POH from 3,303' to 271'.
02:00 - 02:30 0.50 DRILL P INT1 POH with BHA # 3 and inspect same. JAR stand drained 2
gals of oil out of pipe. String NM STAB between motor and
LWD had backed off of mandrel and was floating free. Bit had
1 jet nozzle plugged. Bit grade: 2 - O - WT - S - X - 1/16 - PN -
TD
02:30 - 03:30 1.00 DRILL P INT1 Change out JAR and laydown NM STAB. Run BHA #4 in hole
to 266'.
03:30 - 05:00 1.50 DRILL P INT1 Run in hole with BHA #4 on drillpipe from 266' to 3,298'.
05:00 - 05:30 0.50 DRILL P INT1 Fill pipe and shallow hole test MWD - OK. 495 gpm, 1,885 psi,
PU - 97k, SO - 72k.
05:30 - 12:00 6.50 DRILL P INT1 Trip in hole for cleanout run with BHA #4 from 3,298' to bottom
@ 11,500. Filled pipe every 2,500. Worked through tight spots
without pumping at 9,910' and 10,034'. Used pump and rotary
to work through tight spots at 10, 540' and from 10,840' to TD
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION
Operations Summary Report
Page 8 of 18
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Releaser 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date ;From - To Hours Task Code NPT Phase Description of Operations
11/18/2006 05:30 - 12:00 6.50 DRILL P
12:00 - 18:00 6.00 DRILL P
18:00 - 00:00
11/19/2006
00:00 - 01:00
01:00 - 02:30
02:30 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:30
06:30 - 13:00
6.001 DRILL I P
1.00 DRILL P
1.50 DRILL P
0.50 DRILL P
1.00 BOPSU P
1.00 BOPSU P
1.50 CASE P
6.50 CASE P
13:00 - 13:30 0.50 CASE P
13:30 - 16:00 2.50 CASE P
16:00 - 16:30 0.50 CASE P
16:30 - 00:00 7.50 CASE P
11 /20/2006 ~ 00:00 - 02:00
02:00 - 03:30
2.00 CASE P
1.501 CASE I N
INTi with intermittent pack-offs.
INT1 Circulate and condition mud. 500 gpm, 4,050 psi, 100 rpm,
10-15k TQ, PU - 212k, SO - 130k, RWT - 165k. Circulated 1
bottoms up with old mud with 100% increase in sand over
shakers. Then pumped 1.5 ppg over weighted sweep back to
surface with a 15% increase in cuttings. Circulated and
blended in 580 bbls of new 11.2 ppg LSND mud and continue
to circulate several circulations to shear new mud at 556 gpm,
4,010 psi, 100 rpm, 11 k TO. Lost 19 bbls during first 2
circulations.
INT1 Monitor well - OK. POH from 11,500' to 10,082', above the
TKNG. PU - 270k, SO - 115k. Had 25-40k intermittent drag.
Wiped all tight spots. Pump dry job and POH from 10,082' to
3,010'. Monitored well at shoe - OK. Hole took the proper
displacement.
19 bbl mud loss for tour and day.
INT1 Continue POH from 3,010' to 265'.
INTi Lay down all of BHA #4. Bit grade: 2 - O - WT - S - X - 1/16 -
PN - TD. 'Lost 12 bbls on trip out of hole.
INT1 Clear and clean rig floor.
INT1 Pull wear bushing. Flush BOP stack. Install ROPE test plug.
INT1 Change out top rams from 3.5" x 6" VBR's to 7". Test same to
250 low psi / 4,000 high psi - OK.
INT1 Rig up to run 7" BTC-M x TCII intermediate casing. Make
dummy run with 7" hanger and landing joint.
INTi Pick up and make up 7" shoe track. Placed plastic bypass
baffle on top of float collar. Baker-Lok'd shoe track
connections. Fill pipe and check floats - OK. Run in hole with
7" 26# L-80 BTC casing to 3,284' ~ 1-1/2 minutes perjoint.
Filled every joint and circulated every 10 joints down for 3
minutes @ 4 bpm, 330 psi. Average make up TO - 9,200 ft/Ibs
using Best-O-Life 2000 NM pipe lubricant. 'No mud losses.
INT1 Circulate 1-1/2 annulus volumes @ 4 bpm, 360 psi. PU - 100k,
SO - 88k. *No mud losses.
INT1 Continue running in hole with 7" BTC-M casing from 3,284' to
4,061' ~ 2 minutes per joint. Picked up ES cementer and
crossover joint to TCII. Baker-Lok'd both sides of ES
cementer. Filled every joint and circulated down every 5 joints
C 4 bpm, 360 psi. Ran total of 99 joints of BTC-M. *No mud
losses.
INT1 Change over to TCII equipment. Rig up Torque Turn.
INT1 Continue running in hole with 7" 26# L-80 TCII xBTC-M casing
from 4,101' to 7,197' C~ 3 minutes per joint. Filled every joint
and circulated down every 5 joints for 3 minutes ~ 4 bpm, 530
psi. Make up with Torque Turn equipment to 10,100 fUlbs
make up torque using Jet Lube Seal Guard.
*No mud loss for casing run.
Lost 12 bbls LSND mud for the day.
INT1 Continue running in hole with 7" 26# L-80 TCII xBTC-M casing
from 7,197' to 8,311' @ 2-1/2 minutes per joint. Filled every
joint and circulated down every 5 joints for 3 minutes @ 4 bpm,
560 psi. Franks fill-up tool started leaking.
SFAL INT1 Change out cup on Franks fill-up tool.
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION
Operations Summary Report
Page 9 of 18
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date ,From - To Hours Task Code ~ NPT Phase Description of Operations
11/20/2006 03:30 - 06:30 3.00 CASE P INT1 Continue running in hole with 7" 26# L-80 TCII x BTC-M casing
from 8,311' to 9,779' ~ 2 minutes per joint. Filled every joint
and circulated down every 5 joints for 3 minutes ~ 4 bpm, 615
psi.
06:30 - 08:30 2.00 CASE P INT1 Took weight at 9,779'. Work through without pumping to
9,900'. Attempt to circulate. Packing off and pulling tight. Able
to pull back up hole to 9,871'. PU - 290k, SO - 130 k.
08:30 - 10:00 1.50 CASE P INT1 Establish circulation with 140 gpm, 570 psi. Circulate bottoms
up. Stage pumps up to 4 bpm, 490 psi, 5 bpm, 605 psi.
Brought up to 5.5 bpm and packed off. Work pipe free.
10:00 - 12:00 2.00 CASE P INT1 Run in hole without problem from 9,871' to 10,111'. Break
circulation prior to entering Kingak. Stage pumps up to 5 bpm,
780 psi and circulate bottoms up. PU - 306k, SO - 133k.
12:00 - 14:00 2.00 CASE P INT1 Continue running in hole with 7" casing from 10,111' to 11,470'
without problem, filling every joint and no pumping.
'No mud losses for entire casing run.
Ran total of 184 joints of 7" 26# L-80 TCII casing.
14:00 - 15:00 1.00 CEMT P INTi Rig down casing fill-up tool, blowdown topdrive. Pick up
hanger and landing joint. Land casing on depth @ 11,498'.
Rig down circulating swedge. Rig up cement head and lines.
15:00 - 18:30 3.50 CEMT P INT1 Stage pumps to 5 bpm, 1,030 psi. Packed off. Work pipe with
and without pumps to cure pack-off problem. Free pipe and
stage pumps up to 3.5 bpm, 850 psi with casing landed.
Circulated 2 bottoms up. Hole would pack-off if attempt was
made to increase pump rate.
18:30 - 23:00 4.50 CEMT P INT1 Hole gradually packing off ~ 3.5 bbm. Start working pipe and
increase rate to 5.5 bpm. Circulate 1 bottoms up @ 800 psi
ICP, 680 psi FCP. Start conditioning mud for cement job and
continue circulating @ 5.5 bpm, 685 psi. MW - 11.2 ppg, Vis -
38, YP - 15. Continued working pipe in 8 ft strokes through out
circulation. (6 ft pipe stretch, 2 tt past pick-up weight. PU -
340k, SO - 140k.
23:00 - 00:00 1.00 CEMT P INT1 Switch over to Dowell. Pump 3 bbls water. Shut down and
release bypass plug and load closing plug. Pump 2 bbls water.
Shut down and pressure test lines to 4,000 psi - OK. Pump
75 bbls 11.7 ppg of MudPush II viscosified spacer C~3 5 bpm,
600 psi ICP, 500 psi FCP. Shut down and batch mix lead
cement. Reciprocated pipe as before during circulation.
11/21/2006 00:00 - 03:00 3.00 CEMT P INT1 Continue 1st stage cement job. Pump 115 bbls of 12.0 ppg
average LiteCrete Cement @ rates of 3.5 - 5 bpm, 585 psi ICP,
380 psi FCP. Cement did not blend well. Slurry would ball up
in batch mixers if the density would get over 12.3 ppg. Density
ranged from 11.5 ppg to 12.3 ppg. Batch mix and pump 27
bbls of 15.8 ppg Class "G" tail cement ~ 3.5 bpm, 230 psi ICP,
160 psi FCP. Release closing plug and kick out same with 5
bbls water.
Switch to rig and displace cement with 11.2 ppg mud. 1st 320
bbls C~ 5 bpm, 300 psi ICP, 720 psi FCP. Had a partial
pack-off when lead cement turned the corner but cleaned back
up. Stopped reciprocating and landed casing and pumped 90
bbls ~ 2 bpm, 255 psi ICP, 545 psi FCP. Pumped last 22 bbls
(Total of 432 bbls) C~3 1 bpm, 460 psi ICP, 475 psi FCP.
Bumped at calculated strokes with 95% efficiency to 1,000 psi.
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION
Operations Summary Report
Page 10 of 18
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours I Task Code NPT Phase Description of Operations
11/21/2006 00:00 - 03:00 3.00 CEMT P INT1 CIP ~ 03:00 hr. 'No mud loss during entire cement job.
03:00 - 03:30 0.50 CEMT P INT1 Bleed off pressure and check for flowback - OK. Break cap on
cement head and load 2nd stage closing plug. Pressure up to
3,200 psi to shear ES Cementer open.
03:30 - 05:00 1.50 CEMT P INT1 Circulate 2 bottoms up ~ 4 bpm, 400 psi, ICP &FCP.
Returned 65 bbls of MudPush spacer and no cement.
05:00 - 10:30 5.50 CEMT P INT1 Reduce pump rate to 2 bpm, 200 psi and circulate while waiting
on 1st stage cement 100 be thickening time.
10:30 - 12:00 1.50 CEMT P INT1 Dowell back on location, rig up, prime up and batch mix
cement. Continue circulating (~3 2 bpm, 200 psi. Held PJSM
while circulating.
12:00 - 14:30 2.50 CEMT P INT1 Switch to Dowell. Pump 5 bbls water. Pressure test lines to
4,000 psi - OK. Pump 26 bbls 11.7 ppg of MudPush II
viscosified spacer ~ 5 bpm, 400 psi ICP, 385 psi FCP. Pump
107 bbls of 12.5 ppg LiteCrete lead cement C~3 5 bpm, 485 psi
ICP, 320 psi FCP. No problem mixing cement. Release
closing plug and kick out with 5 bbls of water.
Switch to rig and displace cement with 280 bbls of 11.2 ppg
mud. 1st 170 bbls C~ 5.5 bpm, 320 psi ICP, 460 psi FCP.
Next 30 bbls ~ 5 bpm, 510 psi ICP, 580 psi FCP. Next 30
bbls ~ 3 bpm, 470 psi ICP, 655 FCP. Last 30 bbls ~ 2 bpm,
695 psi ICP, 865 psi FCP. Bumped at calculated strokes with
94% efficiency to 1,500 psi. CIP ~ 13:50 hr. Continue
pressure up to 2,500 psi to close HES cementer. Bleed off
pressure, check for flowback - OK. *No mud loss during entire
cement job. 'Note: 1st stage tail UCA ~ 500 psi ~ 12:54 hr.
1st stage tail UCA C~3 1000 psi C~J 14:26 hr.
14:30 - 16:00 1.50 CEMT P INT1 Blow down lines. Rig down cementing head. Back out and lay
down landing joint.
16:00 - 16:30 0.50 BOPSU P INT1 Make up BOP stack jetting tool and cleanout wellhead and
BOP stack.
16:30 - 18:00 1.50 W HSUR P INT1 Install 7" x 9 5/8" packoff and test same to 5,000 psi - 15
minutes - OK.
18:00 - 19:30 1.50 BOPSU P INT1 Change out 7" rams to 3.5" x 6" VBR's. 'Sim Opps. Perform
7" annulus LOT: TVD - 2,853', MW - 11.2 ppg, leakoff pressure
680 psi, EMW - 15.78 ppg. Injected 2 bbls ~ 1 bpm, 590 psi.
19:30 - 20:00 0.50 BOPSU P INT1 PJSM. Rig up to test BOPE.
20:00 - 00:00 4.00 BOPSU P INT1 Pressure test BOPE to 250 psi low / 4,000 psi high, 5 minutes
each. Test annular preventer to 250 psi low / 3,500 psi high.
Perform accumulator test. Witnessing of test waived by
AOGCC rep Lou Grimaldi. Test witnessed by BP WSL R.
French and NAD TP R. Hunt.
'Note: 2nd stage cement UCA ~ 500 psi @ 22:51 hr.
11/22/2006 00:00 - 00:30 0.50 BOPSU P INT1 Continue testing BOPE. Tested upper and lower VBR pipe
rams with 4" and 4.5" test joints.
00:30 - 01:00 0.50 BOPSU P INT1 Rig down test equipment. Install wear bushing.
01:00 - 02:30 1.50 DRILL P PROD1 PJSM. Pick up and make up 6 1/8" BHA #5: HTC MX-18HDX,
1.5 deg PDM, NM STAB, MWD, NM STAB, 3 ea NM Flex
DC's, CCV bypass sub, XO, 1 jt. 4" DP, JAR, 1 jt 4" DP.
'Note 2nd stage cement UCA @ 1,000 psi ~ 02:14 hr.
02:30 - 03:30 1.00 DRILL P PROD1 RIH with JAR stand. Fill pipe. Function test CCV bypass sub.
Dropped 1st ball to open bypass. Sheared open ~ 1,760 psi.
Normal circulating pressure dropped from 500 psi to 30 psi.
Printed: 12/4/2006 10:09:56 AM
• •
BP EXPLORATION Page 11 of 1$
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name:
ell Name:
e:
Name:
From - To V-04
V-04
DRILL+C
NABOB
NABOB
Hours '
OMPLE
S ALASK
S 9ES
Task
TE
A DRI
.Code ~
LING
NPT
Start
I Rig
Rig
Phase
Spud Date: 11/7/2006
: 11/6/2006 End:
Release: 12/3/2006
Number:
Description of Operations
11/22/2006 02:30 - 03:30 1.00 DRILL P PROD1 Drop shutoff ball. Did not notice any difference in circulating
pressure - 30 psi. Drop closing ball. Sheared ~ 2,500 psi.
Returned to normal circulating pressure of 500 psi. Stand back
JAR stand. Break out ball catcher sub and retrieve all 3 balls.
03:30 - 07:30 4.00 DRILL P PROD1 Run in hole with BHA #5, picking up drill pipe out of pipe shed
from 232' to 3,551'. Shallow hole tested MWD ~ 1,16T. 255
gpm, 1,255 psi.
'Sim Opps: Injected 95 bbls 11.2 ppg mud down the 7"
annulus ~ 3 bpm, 1,150 psi ICP, 750 psi FCP. Freeze protect
annulus with 70 bbls of 75 degrees, dead crude ~ 3 bpm, 900
psi ICP, 1200 psi FCP, 800 psi SIP.
07:30 - 09:00 1.50 DRILL P PROD1 Run in hole with drill pipe out of derrick from 3,551' to 7,347'.
09:00 - 09:30 0.50 DRILL P PROD1 Wash down from 7,347' to HES cementer ~ 7,437'. 255 gpm,
1,760 psi. Cementer on depth.
09:30 - 10:00 0.50 DRILL P PROD1 Rig up and perform 10 minute casing test to 3,500 psi - OK.
10:00 - 10:30 0.50 DRILL P PROD1 Drill out ES cementer. 255 gpm, 2,195 psi on, 2,025 psi off, 60
rpm, 8.7k TQ on, 7k TO off, PU - 161 k, SO - 84k, RWT - 112k,
WOB - 5-7k.
10:30 - 13:00 2.50 DRILL P PROD1 Continue running in hole from 7,440' to 11,359'.
13:00 - 14:30 1.50 DRILL P PROD1 Break circulation. Rig up and perform 30 minute casing test to
3,500 psi - OK.
14:30 - 16:30 2.00 DRILL P PROD1 Wash down from 11,359' to Baffle collar on depth @ 11,411'.
Drill out Baffle collar, cement, Float collar, and cement to
11,480'. 255 gpm, 2,410 psi on, 2,250 psi off, 60 rpm, 15k TO
on, 12k TO off. Mixed in 2 drums of STEEL LURE to reduce
torque with no effect.
16:30 - 18:30 2.00 DRILL P PROD1 Clean out pill pit and mix 45 bbls 8.9 ppg spacer with 4 drums
of STEEL LUBE.
18:30 - 20:30 2.00 DRILL P PROD1 Pump 100 bbls of fresh water, then 50 bbls STEEL LUBE
spacer. Displace well bore from 11.2 ppg LSND mud to 8.9
ppg FloPro mud. 255 gpm, 1,935 psi FCP. Rotated at 60 rpm,
12-14k TO until spacer was up hole and torque was reduced to
5.5k TO. Increase RPM to 100 with 10k TQ, reduced to 5.5k
TO when spacer was at surface. Dumped tube spacer.
20:30 - 21:30 1.00 DRILL P PROD1 PJSM. Cut and slip drilling line 85'. Clean out from under
drawworks and inspect brakes.
21:30 - 22:00 0.50 DRILL P PROD1 Service topdrive.
22:00 - 22:30 0.50 DRILL P PROD1 Drill out cement, Float shoe and 2' rathole from 11,480' to
11,500'.
22:30 - 23:00 0.50 DRILL P PROD1 Drill 20' of 6-1/8" new hole from 11,500' to 11,520'. 255 gpm,
1,960 psi on, 1,840 psi off, 60 rpm, 5.8k TO on, 5k TQ off, PU -
185k, SO - 135k, RWT - 156k, WOB - 8- 10k. ART - .48 hrs.
23:00 - 23:30 0.50 DRILL P PROD1 Circulate 15 minutes @ 255 gpm, 1,840 psi. Rig up to test.
23:30 - 00:00 0.50 DRILL P PROD1 Perform FIT. TVD - 8,613', MW - 8.9 ppg, Test pressure - 963
psi, EMW - 11.05 ppg.
11/23/2006 00:00 - 04:30 4.50 DRILL P PROD1 Directionally drill 6-1/8" production hole from 11,520' to 11,646'.
270 gpm, 2,095 psi on, 1,840 psi off, 60 rpm, 6.2k TQ on, 5.3k
TO off, PU - 189k, SO - 125k, RWT - 159k, WOB - 15-20k.
Survey every 30', backream every stand at drilling rate, 75%
rate reaming down prior to connections.
04:30 - 05:00 0.50 DRILL N RREP PROD1 POH 2 stands to repair top drive brake to 11,480'.
05:00 - 05:30 0.50 DRILL N RREP PROD1 Replace top drive brake cylinder and run in hole.
05:30 - 12:00 6.50 DRILL P PROD1 Directionally drill 6-1/8" production hole from 11,646' to 11,810'.
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION Page 12 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date I From - To i Hours Task Code NPT ~ Phase Description of Operations
11/23/2006 105:30 - 12:00 I 6.50 DRILL P ~ ~ PROD1 270 gpm, 2,180 psi on, 1,880 psi off, 60 rpm, 6.3k TO on, 5.3k
12:00 - 19:00 I 7.001 DRILL I P
19:00 - 20:30 I 1.501 DRILL ( P
20:30 - 21:00 I 0.501 DRILL I P
21:00 - 22:00 I 1.00 DRILL P
22:00 - 00:00 I 2.001 DRILL I P
11/24/2006 100:00 - 04:00 I 4.001 DRILL I P
04:00 - 05:00 I 1.001 DRILL I P
05:00 - 05:30 0.50 DRILL P
05:30 - 06:30 1.00 DRILL P
06:30 - 12:00 I 5.501 DRILL I P
12:00 - 13:00 i.00 DRILL P
13:00 - 13:30 0.50 DRILL P
13:30 - 00:00 10.50 DRILL P
11/25/2006 100:00 - 09:30 I 9.501 DRILL I P
TO off, PU - 191 k, SO - 134k, RWT - 160k, WOB - 20-25k.
AST - 1.86 hrs, ART - 5.6 hrs. Survey every 30', backream
every stand at drilling rate, 75% rate reaming down prior to
connections.
PROD1 Directionally drill 6-1l8" production hole from 11,810' to 12,028'
MD, 8,857' TVD. 80 deg inclination projected at bit. 275 gpm,
2,180 psi on, 1,950 psi off, 60 rpm, 6.3k TO on, 5.3k TO off,
PU - 192k, SO - 133k, RWT - 160k, WOB - 25k. AST - 1.22
hrs, ART - 3.28 hrs. Survey every 30', backream every stand
at drilling rate, 75% rate reaming down prior to connections.
PROD1 Circulate for 10 minutes. Backream from 12,028' to 11,498',
pull up to 1 f ,454', 275 gpm, 2,115 psi, 60 rpm, 6.9k TO, 160k
RWT.
PROD1 Monitor well - OK. Had small amount of gas breaking out at
surface.
PROD1 Circulate bottoms up at 275 gpm, 1,950 psi, 60 rpm, 5k TO,
160k RWT. Returned small amount of gas 700 strokes early to
300 strokes after bottoms up. Flow went from 24% to 30% for
15 seconds, then returned to 24%. No mud pit gain. 9.0 ppg
MW.
PROD1 Monitor well - OK. POH from 11,454' to 11,168' with correct
displacement. PU - 205k, SO - 148k. Pump dry job and POH
from 11,168' to 9,735'.
PROD1 Continue POH for planed bit and motor change out from 9,735'
to 232'.
PROD1 PJSM. Stand back JAR and DC stands. Break out and lay
down bit and motor.
Bitgrade:2-2-LT-A-E-I-CT-BHA.
PRODi Clear and clean rig floor.
PROD1 Pick up and make up Hycalog DSX619M-D2 bit and AIM 1.5
motor. RIH with DC and JAR stands.
PROD1 Run in hole with BHA #6 from 236' to 11,498'. Filled pipe every
2,500'. PU - 188k, SO - 130k. Shallow hole tested MW D
698', 280 gpm, 855 psi - OK.
PROD1 Circulate bottoms up C~ 272 gpm, 1,925 psi, 30 rpm, 5.7k TO,
PU - 187k, SO - 135k. Returned moderate amount of gas 1675
strokes (97bbls) early to 1000 strokes (58 bbls) after bottoms
up. Flow went from 24% to 36%, then returned to 24%. No
mud pit gain. 9.0 ppg MW.
PROD1 Run in hole from 11,498' to 12,028'. Precautionary wash last
stand to bottom ~ 12,028', no fill.
PROD1 Directionally drill 6-1/8" production hole from 12,028' to 12,262'
MD, 8,873' TVD. 275 gpm, 1,900 psi on, 1,710 psi off, 60 rpm,
7.5k TO on, 6.9k TO off, PU - 199k, SO - 129k, RWT - 164k,
WOB - 10-15k. AST - 7.70 hrs, ART - 0.10 hrs. Survey every
30', backream every stand at drilling rate, 75% rate reaming
down prior to connections.
PROD1 Directionally drill 6-1/8" production hole from 12,262' to 12,564'.
275 gpm, 2,330 psi on, 2,190 psi off, PU - 200k, SO - 138k,
RWT - 159k, WOB - 10-15k. Started taking mud ~ 12,524'
with initial dynamic loss rate of 120 bph. Continue to drill
through fault to 12,564' with dynamic losses of 96 bph, slowing
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04
Event Name: DRILL+COMPLETE Start: 11/6/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date I From - To I Hours I Task I Code
11/25/2006 100:00 - 09:30
09:30 - 10:00
10:00 - 10:30
10:30 - 11:00
11:00 - 12:00
9.50 DRILL P
0.50 DRILL P
0.50 DRILL P
0.50 DRILL P
1.00 DRILL P
12:00 - 13:30
13:30 - 14:30
14:30 - 15:00
15:00 - 00:00
11/26/2006 100:00 - 12:00
12:00 - 00:00
NPT ~ Phase
__ _- -
IPRODI
PROD1
PROD1
PROD1
PROD1
1.501 DRILL I P I I PROD1
1.001 DRILL I P I I PROD1
0.501 DRILL I P I I PRODi
9.001 DRILL I P I I PROD1
Page 13 of 18
Spud Date: 11/7/2006
End:
Description of Operations
to 74 bph. Pumping ~ 280 gpm, 2,065 psi. Survey every 30',
backream every stand at drilling rate, 75% rate reaming down
prior to connections. AST - 6.89 hrs, ART - 0.14 hrs.
Monitor well for static losses - 8 bph.
Pump and spot 40 bbls Safecarb LCM pill outside of bit. 20
sacks of Safecarb 20, 26 sacks of Safecarb 250. 262 gpm,
1,830 psi, 80 bph dynamic loss rate.
Monitor well for static losses - 8 bph. No change.
Circulate bottoms up ~ 240 gpm, 1,710 psi with 63 bph
dynamic loss rate.
*Lost 162 bbls 9.0 ppg FlowPro mud from midnight to noon.
Continue drilling from 12,564' to 12,701'. 275 gpm, 2,355 psi
on, 1,895 psi off, 60 rpm, 7.9k TO on, 6.8k TO off. PU - 198k,
SO - 128k, RWT - 158k, WOB - 10-15k. Pump 2nd 40 bbls
Safecarb LCM pill while drilling. 20 sacks of Safecarb 20, 26
sacks of Safecarb 250. No change in losses. Dynamic losses
~ 62 bph. Survey every 30', backream every stand at drilling
rate, 75% rate reaming down prior to connections.
POH 2 stands to 12,506' (5 min). PU - 215k, SO - 138k.
Pump and spot a 40 bbl, 5 ppb Magma Fiber LCM pill outside
of bit C 275 gpm 1,935 psi, 55 rpm, 6.5k TO, 160k RWT.
Monitor well for static losses - 3.5 bph. Run in hole to bottom.
(5 min)
Continue drilling from 12,701' to 13,114'. 275 gpm, 2,385 psi
on, 1,825 psi off, 60 rpm, 9.1 k TO on, 6.6k TO off. PU - 199k,
SO - 135k, RWT - 160k, WOB - 10-15k. Dynamic losses
30-34 bph. AST - 1.44 hrs, ART - 5.60 hrs. Pumped a 40 bbl,
5 ppb Magma Fiber LCM pill ~ 12,983' with no change in
dynamic loss rate. Survey every 30', backream every stand at
drilling rate, 75% rate reaming down prior to connections.
*Lost 485 bbls of 9.0 ppg FlowPro mud from noon to midnight.
*Lost 657 bbls of 9.0 ppg Flowpro mud for the day.
12.00 DRILL P PROD1 Directionally drill 6.125" production hole from 13,114' to
13,754'. 275 gpm, 2,500 psi on, 2,020 psi off, 60 rpm, 8.8k TO
on, 6.7k TO off. PU - 193k, SO - 129k, RWT - 158k, WOB -
10-15k, AST - 2.00 hrs, ART - 5.63 hrs. Dynamic losses C~ 30
bph average. Survey every 30', backream every stand at
drilling rate, 75% of rate reaming down prior to connections.
Lost 370 bbls from midnight to noon. Crossed expected fault
~ 13,485' with initial loss of 50 bbls. Loss rate returned to
30-35 bph. Pumped a 40 bbl, 5 ppb Magma Fiber LCM pill ~
13,618' with losses slowing from 35 bph to 25 bph.
12.00 DRILL P PROD1 Directionally drill 6.125" production hole from 13,754' to
14,392'. 275 gpm, 2,355 psi on, 1,905 psi off, 60 rpm, 8.6k TO
on, 7.4k TO off. PU - 197k, SO - 124k, RWT - 156k, WOB -
10-15k, AST - 1.06 hrs, ART - 7.45 hrs. Dynamic losses @ 38
bph average. Survey every 30', backream every stand at
drilling rate, 75% of rate reaming down prior to connections.
Lost 457 bbls from midnight to noon. Pumped a 40 bbl, 5 ppb
Magma Fiber LCM pill @ 13,945' with losses slowing from 25
bph to 10-20 bph. Loss rate increasing back to 30-40 bph.
Pumped a 40 bbl, 50 ppb Safecarb LCM pill ~ 14,361' without
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION Page 14 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date !From - To Hours Task Code i NPT ~ Phase Description of Operations
~ ___ ____
11/26/2006 12:00 - 00:00 12.00 DRILL P PROD1 any change in loss rate. Mixing up a 7 ppb Magma Fiber pill at
end of tour.
11/27/2006 00:00 - 01:30 1.50 DRILL P PROD1 Directionally drill 6.125" production hole from 14,392' to TD
01:30 - 02:15 0.75 DRILL P PROD1
02:15 - 04:00 1.75 DRILL P PROD1
04:00 - 04:30 0.50 DRILL P PROD1
04:30 - 05:00 0.50 DRILL P PROD1
05:00 - 05:30 0.50 DRILL P PROD1
05:30 - 06:30 1.00 DRILL P PROD1
06:30 - 12:00 5.50 DRILL P PROD1
12:00 - 13:30 1.50 DRILL P PROD1
13:30 - 14:30 1.00 DRILL P PROD1
14:30 - 15:30 1.00 DRILL P PRODi
15:30 - 17:30 2.00 DRILL P PROD1
17:30 - 19:30 2.00 DRILL P PROD1
19:30 - 21:00 1.50 DRILL P PROD1
21:00 - 22:00 1.00 DRILL P PROD1
22:00 - 00:00 2.00 DRILL P PROD1
11/28/2006 00:00 - 04:00 4.00 DRILL P PROD1
04:00 - 05:00 1.00 DRILL P PROD1
14,475' MD, 8,800' TVD. 275 gpm, 2,355 psi on, 1,905 psi off,
60 rpm, 8.6k TO on, 7.4k TO off. PU - 198k, SO - 127k, RWT -
155k, WOB - 10-15k, AST - 0 hrs, ART 1.17 hrs. Dynamic
losses ~ 67 bph. Survey every 30', backream every stand at
drilling rate, 75% of rate reaming down prior to connections.
Circulate for samples to confirm TD ~ 292 gpm, 2,120 psi, 60
rpm, 8.2k TO.
Pump and circulate a 50 bbl, 7 ppb Magma Fiber LCM pill
surface to surface @ 280 gpm, 1,980 psi, 80 rpm, 7.8k TO. No
change in loss rate.
Monitor well for static loss rate. Loss rate ~ 8 bph. MW - 9.0
PPg•
Start wiper trip without pumping. PU - 220k. Pulled OK from
14,475' to 13,927'. Started pulling 20-30k over and started
swabbing. Attempt to work and wipe hole clean without
pumping and without success.
Backream from 13,927' to 13,760. 260 gpm, 1,700 psi, 80
rpm, 8k TO. Started partially packing off. 120 bph loss rate.
Circulate to clean up hole C~3 260 gpm, 1,650 psi, 80 rpm, 7.7k
TO. Flow rate gradually increasing towards normal. Pump 40
bbl, 7 ppb Magma Fiber LCM pill surface to surface.
Monitor well for static loss rate - 12 bph. Backream from
13,760' to 12,319'. 142 gpm, 950 psi, 40 rpm, 5.8k TO.
Lost 703 bbis from midnight to noon.
Continue backreaming from 12,319' to 11,458'. 146 gpm, 950
psi, 42 rpm, 6.3k TO, 165k RWT.
Circulate bottoms up. 250 gpm, 1,445 psi, 60 rpm, 5.3k TO,
155 RWT.
Slip and cut drilling line 60'. Service topdrive, blocks and
crown.
Run in hole from 11,458' to 14,450' filling pipe every 1,000'. No
problems. Precautionary wash to bottom - no fill.
Circulate and condition mud. Pump 40 bbl, 12 ppb Magma
Fiber, 20 ppb MIX II Course LCM pill, surface to surface. 250
gpm, 2,010 psi, 80 rpm, 6.9k TO. Loss rate reduced from 60
bph to 30 bph.
Monitor well - No static losses, MW - 9.0 ppg. POH from
14,475' to 12,500' without pumping and with hole taking proper
displacement. PU - 215k, SO - 135k.
Pump and spot a 7 ppb Magma Fiber, 20 ppb MIX II Course
LCM pill out of bit. 172 gpm, 1,050 psi, 40 rpm, 6.3k TO, PU -
210k, SO - 137k, RWT - 155k.
Monitor well - No static losses. POH from 12,500' to shoe
without problem. PU - 210k, SO - 137k. Monitor well ~ shoe -
static. Pumped dry job and continue POH to 9,800'.
Lost 593 bbls from noon to midnight.
Lost 1,296 bbis for the day.
Continue POH to run 4.5" liner from 9,800' to 236'. Lost 24
bbis on total trip out.
PJSM. Lay down BHA #6, JAR, DC's, MWD, motor and bit.
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION Page 15 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code ~ NPT Phase Description of Operations
L _ _-_ - _ - -- - -
11/28/2006 04:00 - 05:00 1.00 DRILL P PROD1 Bit grade: 2 - 1 - WT - N - X - I - NO - TD
05:00 - 05:30 0.50 DRILL P PROD1 Clear and clean rig floor. Static loss rate ~ 4 bph.
05:30 - 08:00 2.50 CASE P RUNPRD PJSM. Rig up to run chrome 4.5" production liner.
08:00 - 15:00 7.00 CASE P RUNPRD Make up shoe track. Check floats - OK. Run in hole with 4.5"
12.6#, 13Cr, Vam Top production liner.
Ran total of 74 jts to 3,097' at 30sec/joint. Torque turned
connections (Vam Top make up torque - 4,440 ft/Ibs) lubricated
with Jet Lube pipe dope. Fill every 5th joint and circulate over
top of the hole while running in hole.
15:00 - 16:00 1.00 CASE P RUNPRD Make up BOT "HRD" ZXP liner top packer.
16:00 - 16:30 0.50 CASE P RUNPRD Circulate 1.5 x Liner Volume ~ 208 gpm 220 psi.
PU - 67k, SO - 60k
16:30 - 20:30 4.00 CASE P RUNPRD Run in hole with 4.5" liner on 4" drillpipe from 3,147' to 8,636'
~ < 90 fpm, filling pipe every 10 stands. Loss rate slowed to
-10 bph while RIH and no static losses.
20:30 - 22:00 1.50 CASE P RUNPRD CBU @ 211 gpm, 506 psi, PU - 144k, SO - 109k. Gas
circulated out from 1000 stks prior to BU, and 2000 stks after.
Monitor well after gas circulated out. No static losses.
22:00 -00:00 2.00 CASE P RUNPRD Continue running in hole with 4.5" liner on 4" drillpipe from
8,636' to 10,548' ~ < 90 fpm, filling pipe every 10 stands. PU -
168k, SO - 125k at 10,548.
11/29/2006 00:00 - 00:30 0.50 CASE P RUNPRD Continue running in hole with 4.5" liner on 4" drillpipe from
10,548' to 11,497 ~ < 90 fpm, filling pipe every 10 stands.
00:30 - 02:30 2.00 CASE P RUNPRD CBU x 1.2 ~ 170 gpm, 501 psi pumping. PU - 185k, SO -
127k. Minimal gas circulated out on bottoms up. Monitor well
after gas circulated out. No static losses. Recorded pump rate
measurements after CBU:
BPM SPM PSI
1 17 268
2 34 333
3 52 404
4 68 500
5 85 610 (Losses sustained at -40 bph at 5-bpm)
02:30 - 05:30 3.00 CASE P RUNPRD Continue running in hole with 4.5" liner on 4" drillpipe from
11,497' to -13,000' ~ < 30 fpm.
Circulating each stand down at 4 bpm. Well taking -10 bph
while circulating. No significant LCM across shakers while
circulating stands down.
05:30 - 07:00 1.50 CASE P RUNPRD Continue running in hole with 4.5" liner on 4" drillpipe from
-13,000' to 14,479 C~ < 90 fpm, filling pipe every 10 stands.
07:00 - 08:00 1.00 CASE P RUNPRD Break circulation and stage the pumps up to 5 bpm for 1.3
bottoms up. Final circulating pressure 1,070 psi.
08:00 - 09:00 1.00 CEMT P RUNPRD PJSM w/ Schlumberger cementing crew. Line up to pump with
the Schlumberger pumping unit.
09:00 - 09:45 0.75 CEMT P RUNPRD Pressure tested the lines to 4,000 psi -good test. 42.3 bbls of
12.0 ppg Mudpush II were pumped down hole at 3.5 bpm and
928 psi initial and 585 psi final. Switched over and started
pumping the 15.8 ppg Gasblok slurry at 5 bpm and 635 psi
initial and 200 psi final. A total of 93.6 bbls of cement slurry
was pumped. The pumps were shut in and Schlumberger was
lined up to flush lines.
09:45 - 10:30 0.75 CEMT P RUNPRD Pumping was switched from Schlumberger to the rig for
Printed: 12/4/2006 10:09:56 AM
•
BP EXPLORATION Page 16 of 18
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT
11/29/2006 09:45 - 10:30 0.75 CEMT P
Phase Description of Operations
RUNPRD displacement. The dart was dropped and the rig displaced the
cement with a 46 bbl pert pill and 111 bbls of 9.0 ppg old mud
~ 5 bpm. Slowed to 2 bpm -6 bbls prior to latch up. Latch up
of the dart in the liner top wiper plug and observ shear w/ 1600
psi. Increased pumps to 5 bpm until 26 bbls from plug bump.
Reciprocated pipe in 10' strokes until 33 bbls from bump. Plug
was bumped on calculated strokes with 98% efficiency. CIP -
1030 hours. The pressure was increased to 3,500 psi to set
the liner hanger w/ top of extension at 11,340'. Set down 50k
to confirm hanger set. Pressure bled off and floats held.
10:30 - 11:00 0.50 CASE P RUNPRD Rotated 13 turns to right w/ 6k torque and released from the
liner hanger. 1,000 psi pressure was applied while picking up
out of packoff. Brought pumps to 3 bpm after pressure drop
noted and moved 10 bbls up hole and reduce rate to 1.5 bpm.
The weight was slacked of 50k -didn't see any good surface
indication of the packer setting. This step was repeated 2
more times. Rotation was applied to the drill string while
slacking off and stacking out 50k to ensure packer set.
11:00 - 12:00 1.00 CEMT P RUNPRD Circulate cement from the top of the liner at 9 bpm. Saw -46
bbls of cement returned to the surface.
12:00 - 13:30 1.50 CASE P RUNPRD Displace the well from 9.0 ppg flo-pro to 8.9 ppg brine while
working pipe. PU - 205k, SO - 136k.
13:30 - 14:30 1.00 CEMT P RUNPRD Blow down all surface lines and rig down the cement head.
Clean shakers and possum belly.
14:30 - 16:30 2.00 CASE P RUNPRD POOH from 11,340' - 7,688' racking back DP on drillers side.
16:30 - 17:30 1.00 CASE P
17:30 - 20:00 2.50 CASE P
20:00 - 22:30 2.50 CASE P
22:30 - 23:30 1.00 CASE P
23:30 - 00:00 0.50 CASE P
11/30/2006 00:00 - 01:00 1.00 CASE P
01:00 - 02:00 I 1.001 CASE I P
02:00 - 03:00 I 1.001 PERFOBI P
03:00 - 08:00 I 5.001 PERFOBI P
08:00 - 09:00 1.00 PERFOB~ P
09:00 - 12:00 3.00 PERFO P
12:00 - 15:00 I 3.001 PERFOBI P
15:00 - 21:00 I 6.001 PERFOBI P
RUNPRD RIH from 7,688' - 11,331 w/ DP from off-drillers side.
RUNPRD POOH from 11,340' - 7,688' LDDP 1x1.
RUNPRD POOH from 7,688' -Liner running tool standing back DP.
RUNPRD RD Liner running tool. Dog sub tattle-tail sheared successfully
indicating good packer set.
RUNPRD Service Topdrive. Cut & Slip 82' of drilling line.
RUNPRD Service Topdrive. Cut & Slip 82' of drilling line. Change Top
Drive Oil.
RUNPRD Pressure test the 7" casing x 4.5" liner to 3,500 psi -chart and
hold for 30 minutes -good test.
OTHCMP PJSM on running pert guns with SLB and the rig crew. PU perf
gun tools to the floor and load the perf guns in the pipe shed.
RU the floor to run perf guns.
OTHCMP PU 2.5" 4 spf Schlumberger PowerJet Omega perf guns,
blanks and 2-7/8" PAC DP to -3,105'.
OTHCMP RD 2-7/8" handling equipment. Clean & clear rig floor.
OTHCMP RIH with perf guns on 4" DP from the derrick with 1 min/stand
running speed to 8,598'. Filling w/ 8.9 brine doping pin end
only. PU - 190k, SO - 123k
OTHCMP RIH with perf guns on 4" DP from the derrick with 1 min/stand
running speed to 14,385'. Filling w/ 8.9 brine doping pin end
only. PU - 175k, SO - 119k Q 11,340', PU - 212k, SO - 130k
~ 14,385',
OTHCMP Safety standown. Entire evening crew present along w/ Gary
Christman (BP), Mike Schultz(BP), Dan Hebert(NAD), Don
Telfer(RLG), Alan Graff(BP), Kelly Cosby(NAD), Alan
Printed: 12/4/2006 10:09:56 AM
• •
BP EXPLORATION Page 17 of 18
Operations Summary .Report
Legal Well Name: V-04
Common Well Name: V-04 Spud Date: 11/7/2006
Event Name: DRILL+COMPLETE Start: 11/6/2006 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~ Hours Task ~ Code NPT Phase ~ Description of Operations
11/30/2006 15:00 - 21:00 6.00 PERFO P OTHCMP Madsen(Fairweather), Matt Martyn(BP), Brian
Tiedemann(NAD)
21:00 - 22:00 1.00 PERFO P OTHCMP RIH and tag landing collar at 14,385'. Pull up & put guns on
depth at 14,350'.
22:00 - 00:00 2.00 PERFO P OTHCMP Safety standown. Entire morning crew present along w/Mike
Schultz(BP), Dan Hebert(NAD), Don Telfer(RLG), Alan
Graff(BP), Matt Martyn(BP), Brian Tiedemann(NAD)
12/1/2006 00:00 - 01:00 1.00 PERFO P OTHCMP Safety standown. Entire morning crew present along w/ Mike
Schultz(BP), Dan Hebert(NAD), Don Telfer(RLG), Alan
Graff(BP), Matt Martyn(BP), Brian Tiedemann(NAD)
01:00 - 01:30 0.50 PERFO P OTHCMP PJSM on firing guns w/crew and SLB perforating specialist
Shane Morgan
01:30 - 02:00 0.50 PERFO P OTHCMP Closed the rams and increased pressure on the well to 3,000
psi to shear the pins on the firing heads. Held pressure for -30
seconds and then bled off. At 5:36 minutes, observed a noise
spike on the monitor, vibration in the drill pipe and a fluid drop
confirming the first fire. At 7:01 minutes, observed a noise
spike on the monitor, vibration in the drill pipe and a fluid drop
confirming the second fire. Perforation depths from 14,350' -
13,890', 13,840' - 13,795', 13,765' - 13,690', 13,610' - 13,600',
12,800' - 12,670', 12,400' - 12,295', 12,200' - 12,035', and
12,000' - 11,870' with 2.5" 4 spf PowerJet Omega charges.
Well stable after initial 5 bbl drink.
02:00 - 03:00 1.00 PERFO P OTHCMP POH standing back 4" DP from 14,350' to 11,850'. PU - 205k
~ 14,350
03:00 - 05:00 2.00 PERFO P OTHCMP Circulate 2 bottoms up through the bypass sub - 245 gpm,
1,070 psi
Lost 5 bbls to formation during circulation. No gas observed on
circulation.
Brine weight 8.9 ppg in, 8.9 ppg out.
05:00 - 09:00 4.00 PERFO P OTHCMP POH LD 4" DP from 11,848' to 6,427'. PU - 175k SO - 120k ~
11,848'
09:00 - 09:30 0.50 PERFO P OTHCMP RIH w/ 28 stands of 4" DP from derrick from 6,427' to 9,105'.
PU - 136k SO - 100k ~ 6,427'.
09:30 - 15:00 5.50 PERFO P OTHCMP POH LD 4" DP from 9,105' to the 2-7/8" PAC DP at 3,105'.
15:00 - 15:30 0.50 PERFO P OTHCMP RU 2-7/8" handling equipment to LD 2-7/8" PAC and 2.5" pert
guns.
15:30 - 23:00 7.50 PERFO P OTHCMP PJSM to LD perf guns. LD 2-7/8" PAC DP and 2.5" pert guns -
all shots fired.
23:00 - 00:00 1.00 PERFO P OTHCMP Clear and clean the floor of 2-7/8" handling equipment and perf
gun tools.
Total of 27 bbls 8.9 brine lost during trip out of hole.
12/2/2006 00:00 - 01:45 1.75 BUNCO RUNCMP Make dummy run with tubing hanger. RU the floor to run 4.5"
13-Cr VamTop completion.
01:45 - 12:00 10.25 BUNCO P RUNCMP PJSM. PU 4.5" 13Cr tail pipe and RIH.. All connections below
the Baker 7" x 4.5" S-3 production packer were Bakerlok'd.
RIH with 4.5" 12.6# 13Cr Vam Top completion to -5,900' -
torque turned each connection to 4,440 ftlbs utilizing Jet Lube
Seal Guard thread lubricant. PU - 84k, SO - 69k ~ 5,900'.
5 bbls lost to formation in 12 hours.
12:00 - 20:30 8.50 BUNCO P RUNCMP Continue RIH with 4.5" 12.6# 13Cr Vam Top completion to
11,300' -torque turned each connection to 4,440 ft-Ibs. Utilizing
Jet Lube Seal Guard thread lubricant. PU - 155k, SO - 102k C~
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: V-04
Common Well Name: V-04
Event Name: DRILL+COMPLETE Start: 11/6/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To ~ Hours
__ _ _~ __
12/2/2006 12:00 - 20:30 8.50
20:30 - 21:30 1.00
21:30 - 22:00 0.50
22:00 - 00:00 2.00
12/3/2006 00:00 - 01:15 1.25
01:15 - 03:00 1.75
Task ~ Code i NPT I Phase
03:00 - 03:30 I 0.501 BUNCO
03:30 - 04:00 0.50 BOPSU P
04:00 - 14:00 10.00 BOPSU P
14:00 - 16:30 2.50 WHSUR P
16:30 - 17:30 1.00 WHSUR N
17:30 - 18:00 0.50 WHSUR P
18:00 - 18:30 0.50 BUNCO
18:30 - 19:30 1.00 BUNCO
19:30 - 21:00 1.50 BUNCO
21:00 - 23:00 2.00 BUNCO
23:00 - 23:30 0.50 P
23:30 - 00:00 I 0.50 I I P
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
WAIT RUNCMP
RUNCMP
RUNCMP
WAIT I RUNCMP
)RUNCMP
RUNCMP
RUNCMP
RUNCMP
Page 18 of 18
Spud Date: 11 /7/2006
End:
Description of Operations
11,300'
Spaceout, MU hanger, land tubing on hanger with W LEG at
11,353' (tubing measurement) and stabbed 4.5" into the liner
tieback sleeve, PU - 155k, SO - 102k. Ran a total of 263 joints
of 4.5" 12.6# 13Cr Vam Top tubing, 6ea 4.5" x 1" KBG-2
GLM's, 4 X nipples (3.813" ID).
RILDS. RD completion handling equipment.
RU circulation lines and reverse circulate 173 bbls of clean 8.9
ppg brine followed by 90 bbls 8.9 ppg inhibited brine into well at
3 bpm, 350 psi.
Lost 7 bbls in last 12 hours.
Reverse circulate 120 bbls of clean 9.2 ppg brine at 3 bpm, 350
psi -inhibited brine spotted between the GLM with the DCR
shear valve at 6,447' and the S-3 packer at 11,310'.
PJSM. Drop 1-7/8" ball and rod (w/ 2-3/4" wheels) and allow to
seat. Increase pressure to 4,200 psi and set the S-3 packer.
Hold pressure for 30 minutes for tubing test -good (attempted
to chart, but sensor failed). Pressure at start of test was 4220
psi, and 4180 psi at end. Bleed off tubing pressure to 0 psi and
change chart sensor. Pressure tbg back to 2,500 psi.
Increase pressure on the annulus to 3,500 psi. Chart and hold
for 30 minute annulus test -good (lost -20 psi in 30 minutes).
Bleed pressure from the annulus and then the tubing.
Pressure up on the annulus and shear the DCR valve in the
GLM at 6,447' with 2,510 psi. Pump 2 bbls both ways ~ 2
BPM to ensure the shear valve is completely sheared. 800 psi
pumping from casing side, and 550 psi from tubing side.
RD circulation lines and blow down all surface lines. Back out
and lay down the landing joint.
Install TWC and test from below to 1,000 psi -good.
C/O Hydril element. ND BOPE
Install adapter flange. Torque bolts to 1646 ft-Ibs. Test
adapter flange to 5,000 psi -good. NU 4-1/8" carbon tree with
LEO actuator C~ 10-Oclock position. Test tree to 5,000 psi -
good.
Wait on DSM to open LEO valve. Test tree to 5,000 psi -good.
Open LEO valve. Test tree to 5,000 psi w/diesel -good.
Pull TWC with DSM lubricator. Setup rig to freeze protect the
well.
Wait on LRHOS to change out.
PJSM. Pump 92 bbls of diesel freeze protection fluid down the
annulus. Init Cir Pres 1000 - psi, Fin Cir Pres - 1000 psi.
RU lines and allow diesel to U-tube.
Install BPV with lubricator. Test from below to 1,000 psi -good
test. RD LRHOS.
Remove secondary annulus valves and install VR plugs in both
IA valves. Secure the tree. Rig released 2359 12/03/2006 for
V-122.
Printed: 12/4/2006 10:09:56 AM
BP EXPLORATION Page 1 of 1
Leak-Off Test Summary
Legal Name: V-04
Common Name: V-04
---
Test Date ~
Test Type
Test Depth (TMD
Test Depth (ND)
AMW
Surface Pressure
Leak Off Pressure BHP) '
EMW
11/11/2006 LOT 3,372.0 (ft) 2,853.0 (ft) 8.80 (ppg) 720 (psi) 2,024 (psi) 13.66 (ppg)
11/22/2006 FIT 11,498.0 (ft) 8,613.0 (ft) 8.90 (ppg) 963 (psi) 4,945 (psi) 11.05 (ppg)
Printed: 12/4/2006 10:09:51 AM
by
~~~
V-04 S u
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure /Slot: V-Pad / V-04
Well: V-04
Borehole: V-04
UWI/API#: 500292332200
Survey Name /Date: V-04 /November 27, 2006
Tort /AHD / DDI / ERD ratio: 333.977° / 10092.27 ft / 6.735 / 1.124
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location LaULong: N 70.32807833, W 149.26504067
location Grid NIE Y/X: N 5970111.570 ftUS, E 590622.430 ftUS
Grid Convergence Angle: +0.69206820°
Grid Scale Factor: 0.99990933
Re
,~ Sehlumberger
Survey /DLS Computation Method: Minimum Curvature / Lubinski
Vertical Section Azimuth: 277.860°
Vertical Section Origin: N 0.000 ft, E 0.000 ft
TVD Reference Datum: Rotary Table
TVD Reference Elevation: 81.40 ft relative to MSL
Sea Bed /Ground Level Elevation: 52.90 ft relative to MSL
Magnetic Declination: 23.891 °
Total Field Strength: 57627.982 nT
Magnetic Dip: 80.881 °
Declination Date: November 09, 2006
Magnetic Declination Model: BGGM 2006
North Reference: True North
Total Corr Mag North -> True North: +23.891 °
r~
Comments Measured Inclination Azimuth Subsea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section
~ Departure
ft de de n tt ft n n n n de OOft ttUS nUS
H I t U.UU 0.00 U.UU -ti1.4U U.UU U.VV U.UU U.UU U.UU U.UU 0.UU by/Ul l l.b/ byUti"LL.4;i N /U.3LtSU/tS;iS W 74y."L6bU4Uli/
GYD-GC-SS 72.00 0.15 298.44 -9.40 72.00 0.09 0.09 0.09 0.04 -0.08 0.21 5970111.61 590622.35 N 70.32807845 W 149.26504135
168.00 0,18 302.12 86.60 168.00 0.34 0.37 0.37 0.18 -0.32 0.03 5970111.75 590622.11 N 70.32807884 W 149.26504328
267.00 0.19 315.00 185.60 267.00 0.62 0.69 0.69 0.38 -0.57 0.04 5970111.95 590621.86 N 70.32807938 W 149.26504529
357.00 0.31 279.70 275.60 357.00 0.98 1.07 1.06 0.53 -0.91 0.21 5970112.09 590621.51 N 70.32807978 W 149.26504809
449.00 0.40 284.30 367.60 449.00 1.55 1.64 1.61 0.65 -1.47 0.10 5970112.20 590620.95 N 70.32808011 W 149.26505260
541.00 0.52 283.13 459.59 540.99 2.28 2.38 2.34 0.83 -2.19 0.13 5970112.37 590620.23 N 70.32808059 W 149.26505842
633.00 3.49 321.36 551.53 632.93 4.73 5.54 5.34 3.11 -4.34 3.37 5970114.63 590618.05 N 70.32808682 W 149.26507590
726.00 7.01 319.34 644.12 725.52 11.04 14.04 13.74 9.63 -9.81 3.79 5970121.08 590612.50 N 70.32810463 W 149.26512023
818.00 8.05 319.82 735.33 816.73 20.03 26.10 25.77 18.81 -17.63 1.13 5970130.16 590604.58 N 70.32812971 W 149.26518360
913.00 9.64 313.75 829.20 910.60 31.42 40.69 40.36 29.39 -27.66 1.94 5970140.62 590594.42 N 70.32815862 W 149.26526500
Last GYD GC SS 1007.00 12.50 309.51 921.44 1002.84 46.46 58.73 58.34 41.31 -41.20 3.16 5970152.37 590580.74 N 70.32819118 W 149.26 8
First MWD+IFR+MS 1041.66 13.93 308.89 955.18 1036.58 53.23 66.66 66.23 46.31 -47.34 4.15 5970157.30 590574.54 N 70.32820486 W 149.26
1137.77 17.52 310.91 1047.68 1129.08 75.28 92.70 92.21 63.06 -67.29 3.78 5970173.80 590554.39 N 70.32825059 W 149.26 1
1232.85 20.55 313.49 1137.55 1218.95 100.84 123.70 123.21 83.92 -90.21 3.31 5970194.38 590531.22 N 70.32830759 W 149.26577224
1328.85 23.13 315.54 1226.66 1308.06 129.47 159.41 158.90 108.98 -115.65 2.80 5970219.13 590505.48 N 70.32837604 W 149.26597850
1424.57 24.99 315.50 1314.06 1395.46 160.36 198.43 197.90 136.82 -142.99 1.94 5970246.64 590477.81 N 70.32845210 W 149.26620023
1520.05 27.96 310.82 1399.52 1480.92 195.12 240.97 240.43 165.84 -174.08 3.80 5970275.28 590446.38 N 70.32853140 W 149.26645231
1614.45 31.91 308.12 1481.32 1562.72 235.26 288.06 287.41 195.73 -210.47 4.42 5970304.72 590409.63 N 70.32861303 W 149.26674743
1709.11 33.54 306.66 1560.95 1642.35 279.79 339.23 338.38 226.79 -251.13 1.91 5970335.29 590368.60 N 70.32869788 W 149.26707719
1805.26 37.48 305.32 1639.20 1720.60 329.04 395.07 393.94 259.57 -296.33 4.18 5970367.52 590323.02 N 70.32878744 W 149.26744371
1901.16 41.02 305.17 1713.46 1794.86 382.91 455.73 454.32 294.58 -345.87 3.69 5970401.92 590273.06 N 70.32888307 W. 149.26784552
1996.53 44.04 306.43 1783.73 1865.13 439.84 520.19 518.59 332.30 -398.14 3.29 5970439.01 590220.34 N 70.32898612 W 149.26826940
2092.63 43.55 306.91 1853.10 1934.50 498.12 586.70 585.01. 372.02 -451.49 0.62 5970478.07 590166.52 N 70.32909461 W 149.26870203
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 1 2/1 9/2006 8:28 AM Page 1 of 6
Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hale Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
tt de de ft tt ft ft tt ft ft de 00 tt ftUS ftUS
2188.58 42.90 306.26 1923.01 2004.41 555.74 652.41 650.65 411.18 -504.25 0.8Z 5970516.60 590113.30 N 7U.329ZU161 W 149.26912994
2283.85 45.25 306.57 1991.45 2072.85 613.95 718.68 716.84 450.52 -557.58 2.48 5970555.29 590059.51 N 70.32930907 W 149.26956239
2378.89 44.75 306.80 2058.66 2140.06 672.82 785.88 784.00 490.67 -611.47 0.55 5970594.78 590005.14 N 70.32941874 VV 149.26999947
2474.22 44.22 306.02 2126.67 2208.07 731.50 852.68 850.74 530.32 -665.23 0.80 5970633.77 589950.91 N 70.32952705 W 149.27043545
2567.44 44.75 308.32 2193.18 2274.58 788.45 918.00 916.04 569.79 -717.27 1.82 5970672.60 589898.40 N 70.32963485 W 149.27085751
2666.42 44.20 308.85 2263.81 2345.21 848.06 987.34 985.38 613.03 -771.47 0.67 5970715.19 589843.68 N 70.32975298 W 149.27129715
2761.89 44.01 308.59 2332.36 2413.76 905.10 1053.79 1051.83 654.60 -823.31 0.27 5970756.12 589791.35 N 70.32986651 W 149.27171760
2857.33 43.93 308.60 2401.05 2482.45 962.05 1120.05 1118.09 695.93 -875.10 0.08 5970796.82 589739.07 N 70.32997942 W 149.27213764
2953.18 43.69 308.47 2470.22 2551.62 1019.12 1186.40 1184.44 737.27 -927.01 0.27 5970837.52 589686.67 N 70.33009234 W 149.27255862
3048.67 44.11 310.39 2539.03 2620.43 1075.53 1252.61 1250.64 779.32 -978.14 1.46 5970878..95 589635.04 N 70.33020720 W 149.27297336
3143.29 44.28 313.70 2606.88 2688.28 1130.07 1318.56 1316.47 823.49 -1027.11 2.45 5970922.52 589585.55 N 70.33032784 W 149.27337054
3239.86 44.11 318.88 2676.14 2757.54 1182,77 1385.86 1383.18 872.11 -1073.60 3.74 5970970.57 589538.48 N 70.33046066 W 149.27
3325.81 44.36 320.89 2737.72 2819.12 1227,31 1445.81 1442.12 917.96 -1112.22 1.66 5971015.95 589499.30 N 70.33058590 W 149.27 5
3392.06 44.03 321.34 2785.22 2866.62 1260,95 1492.00 1487.39 953.91 -1141.22 0.69 5971051.54 589469.88 N 70.33068410 W 149.27429612
3423.40 44.20 320.92 2807.72 2889.12 1276,83 1513.81 1508.79 970.90 -1154.91 1.08 5971068.36 589455.99 N 70.33073050 W 149.27440717
3518.73 44.77 327.30 2875.77 2957.17 1322.96 1580.58 1573.60 1024.97 -1194.01 4.73 5971121.95 589416.24 N 70.33087820 W 149.27472438
3614.25 43.39 332.39 2944.41 3025.81 1363.89 1647.00 1636.47 1082.37 -1227.40 3.98 5971178.93 589382.16 N 70.33103499 W 149.27499525
3710.54 42.75 337.84 3014.77 3096.17 1399.44 1712.73 1696.84 1141.96 -1255.06 3.92 5971238.19 589353.78 N 70.33119779 W 149.27521970
3805.47 42.77 344.00 3084.50 3165.90 1428.61 1777.15 1753.63 1202.81 -1276.11 4.40 5971298.77 589332.00 N 70.33136402 W 149.27539048
3901.29 43.90 348.19 3154.21 3235.61 1452.96 1842.89 1809.22 1266.62 -1291.88 3.22 5971362.38 589315.46 N 70.33153832 W 149.27551848
3997.72 43.76 348.94 3223.77 3305.17 1475.03 1909.67 1864.87 1332.07 -1305.12 0.56 5971427.66 589301.44 N 70.33171713 W 149.27562595
4092.97 46.52 350.37 3290.96 3372.36 1496.10 1977.18 1921.16 1398.48 -1317.22 3.09 5971493.91 589288.53 N 70.33189856 W 149.27572420
4188.62 47.84 351.16 3355.97 3437.37 1516.71 2047.33 1979.67 1467.73 -1328.48 1.51 5971563.01 589276.45 N 70.33208773 W 149.27581558
4284.34 46.63 349.87 3420.96 3502.36 1537.66 2117.60 2039.17 1537.04 -1340.05 1.61 5971632.17 589264.04 N 70.33227707 W 149.27590953
4379.92 46.43 350.26 3486.72 3568.12 1558.85 2186.97 2098.85 1605.37 -1352.02 0.36 5971700.34 589251.25 N 70.33246372 W 149.27600670
4475.42 46.49 350.00 3552.51 3633.91 1579.94 2256.20 2158.94 1673.57 -1363.88 0.21 5971768.39 589238.56 N 70.33265004 W 149.27610305
4571.47 46.87 350.44 3618.40 3699.80 1601.11 2326.08 2220.08 1742.43 -1375.75 0.52 5971837.10 589225.86 N 70.33283816 W 149.27619943
4666.68 46.10 346.77 3683.97 3765.37 1623.86 2395.11 2281.85 1810.10 -1389.38 2.91 5971904.59 589211.42 N 70.33302301 W 149.27631002
4762.45 46.14 346.06 3750.35 3831.75 1649.10 2464.14 2345.11 1877.19 -1405.59 0.54 5971971.48 589194.40 N 70.33320631 W 149.27644164
4857.51 46.46 346.60 3816.03 3897.43 1674.32 2532.86 2408.45 1943.97 -1421.83 0.53 5972038.05 589177.36 N 70.33338873 W 149.
8
4953.83 45.53 347.37 3882.94 3964.34 1699.01 2602.14 2472.30 2011.47 -1437.44 1.12 5972105.35 589160.94 2
N 70.33357312 W 149.2 6
5049.03 45.78 347.76 3949.49 4030.89 1722.62 2670.23 2535.05 2077.96 -1452.10 0.39 5972171.64 589145.48 N 70.33375475 W 149.27681917
5144.46 45.40 346.74 4016.27 4097.67 1746.62 2738.40 2598.30 2144.44 -1467.14 0.86 5972237.94 589129.63 N 70.33393638 W 149.27694130
5239.50 45.54 346.08 4082.92 4164.32 1771.39 2806.15 2661.75 2210.30 -1483.06 0.52 5972303.59 589112.92 N 70.33411628 W 149.27707054
5335.45 45.31 343.91 4150.26 4231.66 1797.94 2874.49 2726.51 2276.31 -1500.75 1.63 5972369.38 589094.44 N 70.33429660 W 149.27721415
5430.70 45.56 343.81 4217.10 4298.50 1825.55 2942.35 2791.39 2341.50 -1519.62 0.27 5972434.33 589074.79 N 70.33447468 W 149.27736727
5526.30 46.04 343.09 4283.75 4365.15 1853.87 3010.89 2857.19 2407.19 -1539.14 0.74 5972499.77 589054.47 N 70.33465414 W 149.27752576
5627.80 45.52 344.90 4354.54 4435.94 1883.30 3083.63 2926.97 2477.11 -1559.20 1.38 5972569.43 589033.57 N 70.33484513 W 149.27768859
5723.57 45.62 344.36 4421.59 4502.99 1910.28 3152.02 2992.50 2543.05 -1577.33 0.42 5972635.15 589014.65 N 70.33502527 W 149.27783575
5819.29 46.08 344.24 4488.26 4569.66 1937.73 3220.70 3058.54 2609.17 -1595.91 0.49 5972701.03 588995.27 N 70.33520589 W 149.27798662
5915.41 45.86 345.79 4555.07 4636.47 1964.56 3289.80 3124.88 2675.92 -1613.78 1.18 5972767.56 588976.60 N 70.33538825 W 149.27813170
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 12/19/2006 8:28 AM Page 2 of 6
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft n n n de OOft ftUS ftUS
liUlU.4/ 44.51 :14/.45 4EiLL.U/ 4/U:i.4/ lytSy.UU J35/.'L:i :i1tSy.1t5 'L/41.5'L -lb['J.4U 1.23tS 5y/'LC;i'L.`J5 5tS71ybU.ly IV /U.:ii55ti/44 W 14y.G/tfL5tf4tf
6106.33 44.44 347.23 4690.47 4771.87 2012.54 3424.39 3253.09 2807.04 -1644.11 0.18 5972898.29 588944.69 N 70.33574644 W 149.27837799
6201.87 44.86 347.20 4758.44 4839.84 2036.21 3491.54 3317.16 2872.52 -1658.97 0.44 5972963.58 588929.04 N 70.33592531 W 149.27849864
6297.53 45.22 346.34 4826.03 4907.43 2060.57 3559.22 3382.03 2938.41 -1674.47 0.74 5973029.27 588912.75 N 70.33610531 W 149.27862444
6393.26 44.85 347.52 4893.68 4975.08 2084.77 3626.96 3446.99 3004.39 -1689.78 0.95 5973095.05 588896.64 N 70.33628554 W 149.27874883
6489.42 44.89 346.91 4961.83 5043.23 2108.69 3694.80 3512.06 3070.55 -1704.80 0.45 5973161.02 588880.83 N 70.33646627 W 149.27887074
6584.72 44.74 347.71 5029.44 5110.84 2132.27 3761.97 3576.56 3136.07 -1719.55 0.61 5973226.36 588865.29 N 70.33664528 W 149.27899057
6680.34 44.35 346.90 5097.59 5178.99 2155.81 3829.04 3641.07 3201.51 -1734.29 0.72 5973291.60 588849.76 N 70.33682403 W 149.27911026
6774.97 44.06 346.61 5165.42 5246.82 2179.57 3895.02 3704.78 3265.73 -1749.41 0.37 5973355.63 588833.87 N 70.33699947 W 149.27923301
6870.82 43.53 346.13 5234.61 5316.01 2203.87 3961.35 3769.03 3330.20 -1765.04 0.65 5973419.90 588817.46 N 70.33717558 W 149.27935994
6966.78 43.22 345.99 5304.36 5385.76 2228.34 4027.26 3833.01 3394.16 -1780.91 0.34 5973483.66 588800.82 N 70.33735030 W 149.27948886
7062.22 45.20 348.39 5372.77 5454.17 2251.81 4093.80 3897.35 3459.04 -1795.64 2.72 5973548.36 588785.31 N 70.33752756 W 149.2
8
7157.56 44.85 347.62 5440.16 5521.56 2274.71 4161.24 3962.40 3525.02 -1809.66 0.68 5973614.15 588770.50 7
N 70.33770778 W 149.27 1
7253.49 44.38 347.62 5508.45 5589.85 2298.02 4228.62 4027.58 3590.82 -1824.10 0.49 5973679.77 588755.26 N 70.33788755 W 149.27 3
7349.16 43.75 347.24 5577.19 5658.59 2321.25 4295.15 4092.07 3655.77 -1838.58 0.71 5973744.52 588740.00 N 70.33806495 W 149.27995723
7444.53 43.26 347.20 5646.36 5727.76 2344.39 4360.81 4155.82 3719.79 -1853.10 0.51 5973808.37 588724.71 N 70.33823986 W 149.28007518
7537.98 43.36 348.84 5714.36 5795.76 2366.14 4424.90 4217.91 3782.49 -1866.41 1.21 5973870.90 588710.65 N 70.33841115 W 149.28018324
7633.24 45.09 350.27 5782.63 5864.03 2387.00 4491.34 4281.86 3847.83 -1878.44 2.10 5973936.08 588697.83 N 70.33858964 W 149.28028099
7729.03 47.12 351.37 5849.04 5930.44 2407.21 4560.36 4347.97 3915.97 -1889.44 2.28 5974004.07 588686.01 N 70.33877578 W 149.28037038
7824.64 49.19 352.28 5912.82 5994.22 2426.87 4631.59 4415.91 3986.47 -1899.56 2.28 5974074.44 588675.04 N 70.33896836 W 149.28045262
7920.31 49.61 353.08 5975.08 6056.48 2445.89 4704.22 4484.99 4058.51 -1908.81 0.77 5974146.36 588664.92 N 70.33916518 W 149.28052784
8015.64 47.02 350.16 6038.48 6119.88 2465.76 4775.41 4553.16 4128.93 -1919.15 3.55 5974216.64 588653.73 N 70.33935755 W 149.28061185
8111.49 45.27 346.44 6104.90 6186.30 2488.86 4844.51 4620.43 4196.60 -1933.13 3.34 5974284.12 588638.94 N 70.33954239 W 149.28072541
8206.91 44.74 346.22 6172.36 6253.76 2513.63 4911.99 4686.67 4262.16 -1949.07 0.58 5974349.49 588622.20 N 70.33972150 W 149.28085493
8302.26 45.78 345.88 6239.48 6320.88 2538.79 4979.71 4753.26 4327.89 -1965.40 1.12 5974415.01 588605.08 N 70.33990105 W 149.28098756
8397.62 44.82 346.22 6306.55 6387.95 2563.97 5047.49 4819.92 4393.67 -1981.74 1.04 5974480.58 588587.95 N 70.34008075 W 149.28112029
8493.67 45.84 345.68 6374.08 6455.48 2589.47 5115.80 4887.16 4459.93 -1998.33 1.13 5974546.63 588570.57 N 70.34026176 W 149.28125501
8589.19 46.00 346.23 6440.53 6521.93 2815.06 5184.42 4954.73 4526.50 -2014.98 0.45 5974612.99 588553.11 N 70.34044360 W 149.28139027
8684.94 46.12 346.45 6506.97 6588.37 2640.36 5253.36 5022.57 4593.50 -2031.26 0.21 5974679.77 588536.02 N 70.34062662 W 149.28152253
8781.41 46.22 346.54 6573.78 6655.18 2665.71 5322.96 5091.05 4661.17 -2047.52 0.12 5974747.24 588518.96 N 70.34081147 W 149.28165455
8876.66 45.44 346.85 6640.15 6721.55 2690.38 5391.28 5158.26 4727.65 -2063.24 0.85 5974813.52 588502.43 N 70.34099309 W 149.28
8971.92 44.70 346.93 6707.42 6788.82 2714.51 5458.72 5224.59 4793.33 -2078.54 0.78 5974879.01 588486.35 N 70.34117252 W 149.281 55
9067.52 44.01 347.10 6775.78 6857.18 2738.30 5525.55 5290.33 4858.46 -2093.56 0.73 5974943.94 588470.54 N 70.34135042 W 149.28202856
9163.23 42.94 346.74 6845.23 6926.63 2761.83 5591.40 5355.15 4922.60 -2108.46 1.15 5975007.89 588454.87 N 70.34152565 W 149.28214962
9258.52 44.73 346.18 6913.96 6995.36 2785.91 5657.40 5420.22 4986.76 -2123.91 1.92 5975071.85 588438.64 N 70.34170091 W 149.28227518
9354.25 44.97 346.71 6981.83 7063.23 2810.56 5724.91 5486.81 5052.39 -2139.73 0.46 5975137.28 588422.03 N 70.34188020 W 149.28240373
9449.04 44.21 346.89 7049.34 7130.74 2834.48 5791.45 5552.41 5117.18 -2154.93 0.81 5975201.88 588406.05 N 70.34205718 W 149.28252719
9544.30 44.40 343.55 7117.52 7198.92 2860.08 5857.98 5618.28 5181.49 -2171.90 2.46 5975265.98 588388.31 N 70.34223287 W 149.28266507
9640.22 46.31 338.39 7184.94 7266.34 2890.97 5926.20 5686.34 5245.95 -2194.19 4.31 5975330.15 588365.25 N 70.34240893 W 149.28284605
9736.55 46.23 332.15 7251.57 7332.97 2928.43 5995.78 5755.83 5309.11 -2223.28 4.68 5975392.95 588335.40 N 70.34258147 W 149.28308226
9831.35 45.44 326.91 7317.64 7399.04 2970.56 6063.76 5823.18 5367.69 -2257.72 4.05 5975451.11 588300.26 N 70.34274148 W 149.28336189
9927.64 44.78 322.31 7385.61 7467.01 3017.26 6131.96 5889.75 5423.29 -2297.19 3.45 5975506.21 588260.12 N 70.34289332 W 149.28368235
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 1 2/1 9/2006 8:28 AM Page 3 of 6
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
n de de n n n n ft n n de oo n nUS nUS
10023.08 43.137 319.96 7453.89 7535.L9 3U85.8U 61913.64 5953.90 54/5.21 -2339.02 1.9/ 59/5557.82 588Ll /.1i/ N /U.343U3513 W 149.28402193
10118.72 43.05 314.54 7523.34 7604.74 3116.59 6264.40 6015.87 5523.49 -2383.63 3.99 5975605.36 588172.49 N 70.34316701 W 149.28438402
10214.21 43.27 310.71 7593.00 7674.40 3170.23 6329.70 6075.56 5567.71 -2431.67 2.75 5975648.99 588123.92 N 70.34328775 W 149.28477403
10309.87 42.64 310.64 7663.02 7744.42 3225.01 6394.89 6134.34 5610.19 -2481.11 0.66 5975690.87 588073.97 N 70.34340378 W 149.28517534
10406.60 42.04 310.84 7734.52 7815.92 3279.72 6460.04 6193.26 5652.71 -2530.47 0.64 5975732.78 588024.11 N 70.34351989 W 149.28557604
10502.55 41.34 311.24 7806.17 7887.57 3333.14 6523.85 6251.22 5694.61 -2578.61 0.78 5975774.10 587975.47 N 70.34363431 W 149.28596678
10598.39 40.19 311.19 7878.75 7960.15 3385.41 6586.43 6308.26 5735.84 -2625.68 1.20 5975814.75 587927.91 N 70.34374691 W 149.28634892
10694.43 40.17 310.22 7952.13 8033.53 3437.46 6648.39 6364.60 5776.25 -2672.65 0.65 5975854.59 587880.46 N 70.34385726 W 149.28673023
10789.52 41.83 310.55 8023.89 8105.29 3490.06 6710.78 6421.29 5816.67 -2720.17 1.76 5975894.43 587832.46 N 70.34396764 W 149.28711595
10885.55 44.30 309.60 8094.05 8175.45 3545.54 6776.34 6480.84 5858.88 -2770.35 2.66 5975936.02 587781.78 N 70.34408287 W 149.28752330
10980.47 45.80 308.06 8161.11 8242.51 3603.14 6843.52 6541.34 5900.98 -2822.68 1.95 5975977.49 587728.95 N 70.34419786 W 149.28794815
11076.17 44.55 307.65 8228.57 8309.97 3661.92 6911.39 6602.11 5942.64 -2876.27 1.34 5976018.49 587674.86 N 70.34431160 W 149.288 19
11172.09 43.24 306.71 8297.69 8379.09 3719.90 6977.89 6661.44 5982.83 -2929.25 1.53 5976058.03 587621.41 N 70.34442135 W 149.28
11267.19 43.11 305.18 8367.05 8448.45 3777.31 7042.96 6718.98 6021.03 -2981.93 1.11 5976095.59 587568.28 N 70.34452564 W 149.28924090
11362.83 43.79 304.55 8436.48 8517.88 3835.91 7108.73 6776.69 6058.62 -3035.90 0.84 5976132.52 587513.86 N 70.34462829 W 149.28967901
11431.27 45.61 305.03 8485.12 8566.52 3878.83 7156.87 6819.00 6086.09 -3075.43 2.70 5976159.51 587474.01 N 70.34470329 W 149.28999992
11512.76 44.06 308.87 8542.92 8624.32 3929.03 7214.32 6870.55 6120.59 -3121.34 3.83 5976193.45 587427.68 N 70.34479749 W 149.29037266
11543.99 46.55 308.89 8564.88 8646.28 3948.05 7236.51 6890.82 6134.53 -3138.62 7.97 5976207.18 587410.24 N 70.34483554 W 149.29051296
11576.34 49.76 313.26 8586.47 8667.87 3968.19 7260.61 6913.19 6150.37 -3156.76 14.13 5976222.80 587391.91 N 70.34487880 W 149.29066024
11607.50 51.87 312.73 8606.15 8687.55 3987.94 7284.76 6935.91 6166.84 -3174.43 6.90 5976239.05 587374.05 N 70.34492377 W 149.29080367
11639.10 54.46 315.00 8625.10 8706.50 4008.39 7310.04 6959.84 6184.37 -3192.65 10.01 5976256.35 587355.61 N 70.34497163 W 149.29095163
11670.83 57.08 313.80 8642.95 8724.35 4029.47 7336.28 6984.75 6202.72 -3211.40 8.83 5976274.48 587336.65 N 70.34502174 W 149.29110383
11702.48 59.51 312.03 8659.58 8740.98 4051.51 7363.20 7010.10 6221.05 -3231.12 9.03 5976292.56 587316.71 N 70.34507179 W 149.29126395
11734.56 61.03 310.70 8675.49 8756.89 4074.74 7391.06 7036.08 6239.45 -3252.03 5.95 5976310.71 587295.59 N 70.34512205 W 149.29143369
11766.78 62.49 307.78 8690.74 8772.14 4098.97 7419.44 7062.17 6257.40 -3274.01 9.18 5976328.39 587273.39 N 70.34517106 W 149.29161217
11798.75 64.41 305.68 8705.03 8786.43 4124.01 7448.04 7087.95 6274.50 -3296.93 8.40 5976345.21 587250.27 N 70.34521774 W 149.29179825
11830.43 66.15 302.91 8718.28 8799.68 4149.78 7476.81 7113.37 6290.71 -3320.70 9.66 5976361.13 587226.30 N 70.34526199 W 149.29199124
11862.23 68.40 298.61 8730.56 8811.96 4176.79 7506.14 7138.41 6305.69 -3345.90 14.34 5976375.81 587200.92 N 70.34530291 W 149.29219583
11894.58 70.54 297.64 8741.91 8823.31 4205.21 7536.43 7163.56 6319.97 -3372.62 7.19 5976389.76 587174.04 N 70.34534188 W 149.29241271
11926.05 72.74 299.18 8751.82 8833.22 4233.17 7566.30 7188.49 6334.18 -3398.89 8.39 5976403.66 587147.60 N 70.34538067 W 149.29 4
11957.83 75.14 297.75 8760.61 8842.01 4261.76 7596.84 7214.02 6348.74 -3425.73 8.70 5976417.88 587120.59 N 70.34542040 W 149.29
11989.71 77.60 298.43 8768.12 8849.52 4290.83 7627.81 7239.86 6363.32 -3453.06 7.99 5976432.14 587093.09 N 70.34546021 W 149.2930 575
12016.38 79.41 300.82 8773.44 8854.84 4315.09 7653.95 7262.06 6376.24 -3475.78 11.10 5976444.78 587070.22 N 70.34549548 W 149.29325015
12048.79 81.59 299.32 8778.79 8860.19 4344.69 7685.91 7289.38 6392.26 -3503.44 8.13 5976460.46 587042.37 N 70.34553919 W 149.29347471
12080.95 84.69 298.67 8782.63 8864.03 4374,46 7717.84 7316.39 6407.73 -3531.36 9.85 5976475.59 587014.26 N 70.34558143 W 149.29370141
12112.74 86.20 297.42 8785.15 8866.55 4404,21 7749.53 7342.96 6422.63 -3559.33 6.16 5976490.15 586986.12 N 70.34562210 W 149.29392845
12144.09 86.74 294.67 8787.09 8868.49 4433,93 7780.82 7368.62 6436.37 -3587.44 8.92 5976503.54 586957.85 N 70.34565959 W 149.29415665
12176.19 87.88 292.69 8788.59 8869.99 4464.78 7812.88 7394.19 6449.25 -3616.81 7.11 5976516.07 586928.33 N 70.34569473 W 149.29439501
12207.07 87.68 290.93 8789.79 8871.19 4494.73 7843.74 7418.23 6460.71 -3645.45 5.73 5976527.18 586899.55 N 70.34572601 W 149.29462756
12239.59 86.95 286.45 8791.31 8872.71 4526.62 7876.22 7442.44 6471.12 -3676.22 13.94 5976537.22 586868.67 N 70.34575440 W 149.29487727
12271.63 87.54 283.00 8792.85 8874.25 4558.39 7908.22 7464.83 6479.25 -3707.16 10.91 5976544.97 586837.63 N 70.34577658 W 149.29512848
12302.04 87.90 280.62 8794.06 8875.46 4588.70 7938.61 7485.03 6485.47 -3736.90 7.91 5976550.83 586807.82 N 70.34579353 W 149.29536988
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 12/19/2006 8:28 AM Page 4 of 6
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Fasting Latitude Longitude
Depth Section Departure
ft de de tt ft it ft ft ft ft de 100 ft ftUS ftUS
1C:i3b.lU titS.t55L//./4 7i/`J~.UU tftf/b.4U 4t)Ll./4 /`J/l.bb /bU5.y3 (i4yU./4 -:i/t)`J.SL `J.1/ 5y/b555./1
12367.37 88.44 274.22 8795.76 8877.16 4653.98 8003.92 7524.99 6494.10 -3801.60 10.98 5976558.68
12398.75 88.19 270.42 8796.69 8878.09 4685.19 8035.28 7541.96 6495.37 -3832.94 12.13 5976559.57
12431.60 87.25 267.91 8797.99 8879.39 4717.63 8068.11 7558.28 6494.89 -3865.75 8.15 5976558.70
12463.18 87.13 267.58 8799.54 8880.94 4748.68 8099.65 7573.39 6493.65 -3897.27 1.11 5976557.08
12494.76 85.44 266.54 8801.59 8882.99 4779.64 8131.16 7588.25 6492.03 -3928.74 6.28 5976555.08
12527.04 82.80 267.01 8804.90 8886.30 4811.15 8163.27 7603.35 6490.23 -3960.80 8.31 5976552.89
12559.46 80.36 266.14 8809.64 8891.04 4842.59 8195.34 7618.45 6488.31 -3992.81 7.98 5976550.58
12591.21 80.21 265.57 8815.00 8896.40 4873.20 8226.63 7632.93 6486.05 -4024.02 1.83 5976547.95
12622.65 80.54 264.54 8820.26 8901.66 4903.43 8257.63 7646.99 6483.38 -4054.90 3.40 5976544.90
12654.18 80.47 264.57 8825.46 8906.86 4933.69 8288.73 7660.95 6480.43 -4085.86 0.24 5976541.58
12686.17 80.28 265.17 8830.81 8912.21 4964.43 8320.27 7675.37 6477.61 -4117.28 1.94 5976538.38
12717.88 80.47 266.13 8836.11 8917.51 4994.98 8351.53 7690.14 6475.24 -4148.45 3.04 5976535.63
12750.14 80.68 266.50 8841.39 8922.79 5026.16 8383.36 7705.60 6473.19 -4180.21 1.31 5976533.20
12782.20 80.89 265.97 8846.53 8927.93 5057.16 8415.00 7721.04 6471.11 -4211.79 1.76 5976530.74
12813.31 80.96 266.43 8851.43 8932.83 5087.25 8445.72 7736.10 6469.08 -4242.44 1.48 5976528.34
12845.30 81.03 266.19 8856.44 8937.84 5118.20 8477.32 7751.74 6467.04 -4273.97 0.77 5976525.92
12876.63 80.99 267.14 8861.34 8942.74 5148.56 8508.26 7767.32 6465.24 -4304.86 3.00 5976523.75
12908.58 80.91 266.37 8866.36 8947.76 5179.52 8539.82 7783.34 6463.46 -4336.36 2.39 5976521.58
12940.61 81.17 266.74 8871.35 8952.75 5210.55 8571.46 7799.40 6461.56 -4367.94 1.40 5976519.30
12971.70 81.30 267.86 8876.09 8957.49 5240.75 8602.18 7815.43 6460.11 -4398.64 3.58 5976517.48
13004.28 81.11 267.68 8881.07 8962.47 5272.45 8634.38 7832.55 6458.86 -4430.81 0.80 5976515.84
13036.59 83.21 267.25 8885.48 8966.88 5303.93 8666.38 7849.52 6457.44 -4462.78 6.63 5976514.04
13068.24 83.73 268.54 8889.08 8970.48 5334.90 8697.83 7866.48 6456.28 -4494.21 4.37 5976512.51
13100.37 84.90 266.46 8892.26 8973.66 5366.35 8729.80 7883.63 6454.89 -4526.15 7.40 5976510.73
13131.27 88.30 268.12 8894.09 8975.49 5396.66 8760.64 7900.16 6453.43 -4556.95 12.24 5976508.90
13163.52 91.24 266.97 8894.22 8975.62 5428.39 8792.89 7917.66 6452.05 -4589.17 9.79 5976507.13
13195.78 92.91 268.79 8893.05 8974.45 5460.14 8825.13 7935.41 6450.86 -4621.38 7.65 5976505.55
13227.41 96.05 268.88 8890.58 8971.98 5491.28 8856.66 7953.29 6450.22 -4652.90 9.93 5976504.52
13259.29 97.40 269.19 8886.85 8968.25 5522.56 8888.32 7971.42 6449.68 -4684.56 4.34 5976503.61
13291.29 97.23 270.26 8882.77 8964.17 5553.98 8920.05 7989.99 6449.53 -4716.30 3.36 5976503.07
13323.45 97.05 269.74 8878.78 8960.18 5585.59 8951.97 8008.87 6449.53 -4748.21 1.70 5976502.69
13354.74 96.99 269.07 8874.95 8956.35 5616.31 8983.02 8027.06 6449.21 -4779.26 2.13 5976501.99
13387.08 97.06 269.74 8871.00 8952.40 5648.06 9015.12 8045.94 6448.88 -4811.36 2.07 5976501.27
13419.30 96.93 270.93 8867.07 8948.47 5679.76 9047.10 8065.25 6449.06 -4843.34 3.69 5976501.07
13450.66 97.36 271.39 8863.17 8944.57 5710.67 9078.21 8084.48 6449.69 -4874.45 2.00 5976501.32
13482.80 97.21 271.52 8859.10 8940.50 5742.35 9110.09 8104.38 6450.50 -4906.32 0.62 5976501.75
13514.48 97.53 271.76 8855.03 8936.43 5773.58 9141.51 8124.14 6451.40 -4937.72 1.26 5976502.27
13545.98 97.40 272.27 8850.94 8932.34 5804.65 9172.75 8144.02 6452.50 -4968.94 1.66 5976502.99
13578.60 97.32 272.18 8846.76 8928.16 5836.85 9205.10 8164.78 6453.76 -5001.26 0.37 5976503.85
13610.60 98.37 272.11 8842.39 8923.79 5868.39 9236.80 8185.16 6454.94 -5032.94 3.29 5976504.66
btSb//b.14 N /U.:3402fU/Ci5 W 14`J.C`JSt);i4t)5
586743.02 N 70.34581702 W 149.29589503
586711.68 N 70.34582044 W 149.29614936
586678.87 N 70.34581909 W 149.29641570
586647.38 N 70.34581566 W 149.29667150
586615.93 N 70.34581120 W 149.29692691
586583.90 N 70.34580622 W 149.29718708
586551.92 N 70.34580094 W 149.29744688
586520.74 N 70.34579471 W 149.29770019
586489.89 N 70.34578737 W 149.29795083
586458.98 N 70.34577926 W 149.29820206
586427.60 N 70.34577151 W 149.2 1
586396.46. N 70.34576499 W 149.29 0
586364.74 N 70.34575935 W 149.29896775
586333.19 N 70.34575362 W 149.29922403
586302.56 N 70.34574802 W 149.29947280
586271.06 N 70.34574241 W 149.29972870
586240.20 N 70.34573744 W 149.29997942
586208.72 N 70.34573252 W 149.30023508
586177.17 N 70.34572727 W 149.30049139
586146.50 N 70.34572327 W 149.30074049
586114.35 N 70.34571980 W 149.30100160
586082.40 N 70.34571588 W 149.30126110
586050.99 N 70.34571267 W 149.30151613
586019.08 N 70.34570881 W 149.30177534
585988.29 N 70.34570477 W 149.30202535
585956.10 N 70.34570095 W 149.30228681
585923.90 N 70.34569763 W 149.30254827
585892.39 N 70.34569583 W 149.30280411
585860.75 N 70.34569432 W 149.30
585829.02 N 70.34569385 W 149.30
585797. i i N 70.34569379 W i 49.30357761
585766.07 N 70.34569286 W 149.30382964
585733.98 N 70.34569189 W 149.30409013
585702.01 N 70.34569235 W 149.30434967
585670.89 N 70.34569401 W 149.30460217
585639.02 N 70.34569617 W 149.30486083
585607.61 N 70.34569857 W 149.30511573
585576.39 N 70.34570151 W 149.30536907
585544.05 N 70.34570488 W 149.30563144
585512.36 N 70.34570807 W 149.30588854
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 12/19/2006 8:28 AM Page 5 of 6
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft tt ft ft de 00 ft ftUS ftUS
131i4'1.UU yt5.U5 'L/L.t525 Ctf:S/./5 tSyly.lb StSyy.:S1 yLb/.t5b tfLUS.J:S ti45b.L`J -bUb3.`J/ L.btf 5`J/tl5V5.b:1
13674.07 98.68 273.64 8832.92 8914.32 5930.91 9299.56 8226.32 6458.10 -5095.62 2.34 5976507.06
13705.72 98.25 273.42 8828.26 8909.66 5962.12 9330.86 8247.22 6460.02 -5126.86 1.52 5976508.60
13737.67 98.20 273.69 8823.69 8905.09 5993.66 9362.48 8268.41 6461.99 -5158.42 0.85 5976510.18
13769.15 98.23 273.38 8819.19 8900.59 6024.73 9393.64 8289.34 6463.91 -5189.52 0.98 5976511.73
13801.71 97.26 272.49 8814.80 8896.20 6056.87 9425.90 8310.84 6465.56 -5221.74 4.03 5976512.99
13832.95 96.95 272.46 8810.94 8892.34 6087.73 9456.90 8331.37 6466.90 -5252.71 1.00 5976513.96
13866.19 97.48 271.66 8806.76 8888.16 6120.54 9489.88 8353.11 6468.08 -5285.67 2.87 5976514.74
13898.25 97.86 272.14 8802.48 8883.88 6152.14 9521.65 8374.05 6469.14 -5317.42 1.90 5976515.41
13929.76 98.09 273.54 8798.11 8879.51 6183.22 .9552.86 8395.07 6470.68 -5348.59 4.46 5976516.58
13961.64 98.52 272.88 8793.51 8874.91 6214.67 9584.40 8416.52 6472.45 -5380.08 2.45 5976517.97
13993.67 99.06 273.79 8788.61 8870.01 6246.22 9616.06 8438.17 6474.29 -5411.68 3.27 5976519.43
14025.33 99.00 274.12 8783.64 8865.04 6277.42 9647.32 8459.86 6476.45 -5442.88 1.05 5976521.21
14057.25 99.18 273.75 8778.60 8860.00 6308.86 9678.84 8481.78 6478.61 -5474.32 1.28 5976522.99
14089.79 99.48 274.13 8773.32 8854.72 6340.90 9710.95 8504.17 6480.81 -5506.36 1.48 5976524.81
14121.40 98.20 272.74 8768.47 8849.87 6372.04 9742.19 8525.81 6482.69 -5537.53 5.94 5976526.30
14153.18 97.72 272.94 8764.06 8845.46 6403.39 9773.66 8547.45 6484.25 -5568.97 1.63 5976527.48
14185.12 97.80 273.09 8759.75 8841.15 6434.92 9805.31 8569.33 6485.91 -5600.57 0.53 5976528.76
14216.74 97.84 273.32 8755.45 8836.85 6466.15 9836.63 8591.13 6487.66 -5631.85 0.73 5976530.14
14249.11 98.17 272.86 8750.94 8832.34 6498.09 9868.69 8613.45 6489.39 -5663.86 1.74 5976531.48
14281.29 97.79 273.84 8746.47 8827.87 6529.86 9900.56 8635.80 6491.25 -5695.67 3.24 5976532.96
14313.23 98.30 274.73 8742.00 8823.40 6561.42 9932.18 8658.40 6493.61 -5727.21 3.19 5976534.94
14344.97 97.74 273.16 8737.58 8818.98 6592.78 9963.61 8680.79 6495.78 -5758.56 5.21 5976536.72
14376.34 97.95 272.22 8733.29 8814.69 6623.73 9994.69 8702.50 6497.23 -5789.60 3.04 5976537.80
14407.92 98.08 271.29 8728.89 8810.29 6654.82 10025.96 8724.04 6498.19 -5820.86 2.95 5976538.39
Last MWD+IFR+MS 14427.32 98.75 271.44 8726.05 8807.45 6673.89 10045.15 8737.19 6498.65 -5840.05 3.54 5976538.61
TD (Projected) 14475.00 98.75 271.44 8718.80 8800.20 6720.72 10092.27 8769.63 6499.83 -5887.15 0.00 5976539.23
Survey Type: Definitive Survey
NOTES: GYD GC SS - (Gyrodata -gyro single shots •- Gyrodata gyro orientatio n surveys. Not to be run above 70 degrees inclination. )
MWD +IFR + MS - (In-fie ld referenced MWD with mutt-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is appl ied to enhance inclination accuracy. )
Legal Descriation: Northing (Y) [ftUS] Easting (X) [ftUS]
Surface : 4863 FSL 1678 FEL S11 T11 N R11 E UM 5970111.57 590622.43
BHL : 801 FSL 2279 FEL S34 T12N R11 E UM 5976539.23 584657.75
btSb4t51.3:5 N /U.:34b/11/U W 14`J.:SUb14U:i5
585449.66 N 70.34571657 W 149.30639726
585418.40 N 70.34572178 W 149.30665086
585386.82 N 70.34572708 W 149.30690702
585355.70 N 70.34573227 W 149.30715943
585323.47 N 70.34573672 W 149.30742094
585292.48 N 70.34574031 W 149.30767231
585259.52 N 70.34574349 W 149.30793979
585227.76 N 70.34574631 W 149.30819752
585196.58 N 70.34575047 W 149.30845048
585165.07 N 70.34575523 W 149.30870611
585133.45 N 70.34576020 W 149.308 59
585102.23 N 70.34576603 W 149.3
585070.77 N 70.34577188 W 149.30 0
585038.71 N 70.34577784 W 149.30973100
585007.52 N 70.34578289 W 149.30998405
584976.07 N 70.34578709 W 149.31023918
584944.45 N 70.34579157 W 149.31049570
584913.16 N 70.34579629 W 149.31074956
584881.14 N 70.34580095 W 149.31100935
584849.31 N 70.34580597 W 149.31126756
584817.74 N 70.34581236 W 149.31152354
584786.37 N 70.34581820 W 149.31177802
584755.32 N 70.34582212 W 149.31202997
584724.05 N 70.34582467 W 149.31228366
584704.86 N 70.34582588 W 149.31243938
584657.75 N 70.34582901 W 149.31282174
•
SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-04\V-04\V-04 \V-04 Generated 12/19/2006 8:28 AM Page 6 of 6
G
6'~
j
W
I~
SCHLUMBERGER
Survey report
Client ...................:
Field .....................
Well ......................
API number ...............:
Engineer .................:
Rig :......................
STATE:........... .......
----- Survey calculation m
Method for positions.....:
Method for DLS............
BP Exploration (Alaska) Inc.
Prudhoe Bay
V-04
50-029-23322-00
St. Amour
Nabors 9ES
Alaska
ethods-------------
Minimum curvature
Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 24.07 ft
KB above permanent.......: N/A (Topdrive)
DF above permanent......,: 81.40 ft
----- Vertical section origin----------------
Latitude (+N/S-)........,: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from Vsect Origin to target: 277.86 degrees
27-Nov-2006 10:17:06 Page 1 of 9
Spud date ................: 7-Nov-06
Last survey date.........: 27-Nov-06
Total accepted surveys...: 216
MD of first survey.......: 0.00 ft
MD of last survey........: 14427.32 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2005
Magnetic date ............: 07-Nov-2006
Magnetic field strength..: 57581.48 LAMA
Magnetic dec (+E/W-).....: 24.07 degrees
Magnetic dip .............: 80.86 degrees
----- MWD survey Reference
Reference G ..............:
Reference H ..............:
Reference Dip ............:
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 meal
57581.50 LAMA
80.86 degrees
(+/-) 2.50 meal
(+/-)300.00 GAMA
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.07 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.07 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ....
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
•
U
SCHLUMBERGER Survey Report
27-Nov-2006 10:17:06
Page 2 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft} (deg) (deg) (ft) {ft) (ft) (ft) (ft) {ft) (deg) 100f) type (deg)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 72.00 0.15 298.44 72.00 72.00 0.09 0.04 -0.08 0.09 298.44 0.21 BP _GYD CT DMS
3 168.00 0.18 302.12 96.00 168.00 0.34 0.18 -0.32 0.37 299.94 0.03 BP _GYD CT DMS
4 267.00 0.19 315.00 99.00 267.00 0.62 0.38 -0.57 0.69 304.00 0.04 BP _GYD CT DMS
5 357.00 0.31 279.70 90.00 357.00 0.98 0.53 -0.91 1.06 300.11 0.21 BP GYD CT DMS
6 449.00 0.40 284.30 92.00 449.00 1.55 0.65 -1.47 1.61 293.89 0.10 BP _GYD CT DMS
7 541.00 0.52 283.13 92.00 540.99 2.28 0.83 -2.19 2.34 290.67 0.13 BP _GYD CT DMS
8 633.00 3.49 321.36 92.00 632.93 4.73 3.11 -4.34 5.34 305.58 3.37 BP _GYD CT DMS
.9 726.00 7.01 319.34 93.00 725.52 11.04 9.63 -9.81 13.74 314.45 3.79 BP _GYD CT DMS
10 818.00 8.05 319.82 92.00 816.73 20.03 18.81 -17.63 25.77 316.86 1.13 BP GYD CT DMS
11 913.00 9.64 313.75 95.00 910.60 31.42 29.39 -27.66
12 1007.00 12.50 309.51 94.00 1002.84 46.46 41.31 -41.20
13 1041.6 6 13.93 308.89 34.66 1036.58 53.23 46.31 -47.34
14 1137.77 17.52 310.91 96.11 1129.08 75.28 63.06 -67.29
15 1232.85 20.55 313.49 95.08 1218.95 100.84 83.92 -90.21
16 1328.85 23.13 315.54 96.00 1308.06 129.47 108.98 -115.65
17 1424.57 24.99 315.50 95.72 1395.46 160.36 136.82 -142.99
18 1520.05 27.96 310.82 95.48 1480.92 195.12 165.84 -174.08
19 1614.45 31.91 308.12 94.40 1562.72 235.26 195.73 -210.47
20 1709.11 33.54 306.66 94.66 1642.35 279.79 226.79 -251.13
21 1805.26 37.48 305.32 96.15 1720.60 329.04 259.57 -296.33
22 1901.16 41.02 305.17 95.90 1794.86 382.91 294.58 -345.87
23 1996.53 44.04 306.43 95.37 1865.13 439.84 332.30 -398.14
24 2092.63 43.55 306.91 96.10 1934.50 498.12 372.02 -451.49
25 2188.58 42.90 306.26 95.95 2004.41 555.74 411.18 -504.25
26 2283.85 45.25 306.57 95.27 2072.85 613.95 450.52 -557.58
27 2378.89 44.75 306.80 95.04 2140.06 672.82 490.67 -611.47
28 2474.22 44.22 306.02 95.33 2208.07 731.50 530.32 -665.23
29 2567.44 44.75 308.32 93.22 2274.58 788.45 569.79 -717.27
30 2666.42 44.20 308.85 98.98 2345.21 848.06 613.03 -771.47
40.36 316.73
58.34 315.07
66.23 314.37
92.21 313.14
123.21 312.93
158.90 313.30
197.90 313.74
240.43 313.61
287.41 312.92
338.38 312.08
393.94 311.22
454.32 310.42
518.59 309.85
585.01 309.49
650.65 309.20
716.84 308.94
784.00 308.75
850.74 308.56
916.04 308.46
985.38 308.47
1.94 BP_GYD CT DMS
3.16 BP_GYD CT DMS
4.15 BP_MWD+IFR+MS
3.78 BP_MWD+IFR+MS
3.31 BP_MWD+IFR+MS
2.80 BP_MWD+IFR+MS
1.94 BP_MWD+IFR+MS
3.80 BP_MWD+IFR+MS
4.42 BP_MWD+IFR+MS
1.91 BP MWD+IFR+MS
4.18 BP_MWD+IFR+MS
3.69 BP_MWD+IFR+MS
3.29 BP_MWD+IFR+MS
0.62 BP_MWD+IFR+MS
0.82 BP MWD+IFR+MS
2.48 BP_MWD+IFR+MS
0.55 BP_MWD+IFR+MS
0.80 BP_MWD+IFR+MS
1.82 BP_MWD+IFR+MS
0.67 BP_MWD+IFR+MS
•
i
SCHLUMBERGER Survey Report
27-Nov-2006 10:17:06
Page 3 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
31 2761.89 44.01 308.59 95.47 2413.76 905.10 654.60 -823.31 1051.83 308.49 0.27 BP _MWD+IFR+MS
32 2857.33 43.93 308.60 95.44 2482.45 962.05 695.93 -875.10 1118.09 308.49 0.08 BP _MWD+IFR+MS
33 2953.18 43.69 308.47 95.85 2551.62 1019.12 737.27 -927.01 1184.44 308.50 0.27 BP _MWD+IFR+MS
34 3048.67 44.11 310.39 95.49 2620.43 1075.53 779.32 -978.14 1250.64 308.55 1.46 BP MWD+IFR+MS
35 3143.29 44.28 313.70 94.62 2688.28 1130.07 823.49 -1027.11 1316.47 308.72 2.45 BP _
MWD+IFR+MS
36 3239.86 44.11 318.88 96.57 2757.54 1182.77 872.11 -1073.60 1383.18 309.09 3.74 BP _MWD+IFR+MS
37 3325.81 44.36 320.89 85.95 2819.12 1227.31 917.96 -1112.22 1442.12 309.53 1.66 BP MWD+IFR+MS
38 3392.06 44.03 321.34 66.25 2866.62 1260.94 953.91 -1141.22 1487.39 309.89 0.69 BP _
MWD+IFR+MS
39 3423.40 44.20 320.92 31.34 2889.12 1276.83 970.90 -1154.91 1508.79 310.05 1.08 BP _
MWD+IFR+MS
40 3518.73 44.77 327.30 95.33 2957.17 1322.96 1024.97 -1194.01 1573.60 310.64 4.73 BP _
MWD+IFR+MS
41 3614.25 43.39 332.39 95.52 3025.81 1363.88 1082.37 -1227.40 1636.47 311.41 3.98 BP MWD+IFR+MS
42 3710.54 42.75 337.84 96.29 3096.17 1399.44 1141.96 -1255.06 1696.84 312.30 3.92 BP _
MWD+IFR+MS
43 3805.47 42.77 344.00 94.93 3165.90 1428.61 1202.81 -1276.11 1753.63 313.31 4.40 BP _
_MWD+IFR+MS
44 3901.29 43.90 348.19 95.82 3235.61 1452.96 1266.62 -1291.88 1809.22 314.43 3.22 BP MWD+IFR+MS
45 3997.72 43.76 348.94 96.43 3305.17 1475.02 1332.07 -1305.12 1864.87 315.59 0.56 BP _
MWD+IFR+MS
46 4092.97 46.52 350.37 95.25 3372.36 1496.09 1398.48 -1317.22 1921.16 316.71 3.09 BP MWD+IFR+MS
47 4188.62 47.84 351.16 95.65 3437.37 1516.71 1467.73 -1328.48 1979.67 317.85 1.51 BP _
MWD+IFR+MS
48 4284.34 46.63 349.87 95.72 3502.36 1537.65 1537.04 -1340.05 2039.17 318.92 1.61 BP _
MWD+IFR+MS
49 4379.92 46.43 350.26 95.58 3568.12 1558.85 1605.37 -1352.02 2098.85 319.90 0.36 BP MWD+IFR+MS
50 4475.42 46.49 350.00 95.50 3633.91 1579.93 1673.57 -1363.88 2158.94 320.82 0.21 BP _
MWD+IFR+MS
51 4571.47 46.87 350.44 96.05 3699.80 1601.11 1742.43 -1375.75 2220.08 321.71 0.52 BP MWD+IFR+MS
52 4666.68 46.10 346.77 95.21 3765.37 1623.86 1810.10 -1389.38 2281.85 322.49 2.91 BP _
MWD+IFR+MS
53 4762.45 46.14 346.06 95.77 3831.75 1649.10 1877.19 -1405.59 2345.11 323.18 0.54 BP _
MWD+IFR+MS
54 4857.51 46.46 346.60 95.06 3897.43 1674.32 1943.97 -1421.83 2408.45 323.82 0.53 BP _
MWD+IFR+MS
55 4953.83 45.53 347.37 96.32 3964.34 1699.01 2011.47 -1437.44 2472.30 324.45 1.12 BP _
MWD+IFR+MS
56 5049.03 45.78 347.76 95.20 4030.89 1722.62 2077.96 -1452.10 2535.05 325.05 0.39 BP MWD+IFR+MS
57 5144.46 45.40 346.74 95.43 4097.67 1746.61 2144.44 -1467.14 2598.30 325.62 0.86 BP _
MWD+IFR+MS
58 5239.50 45.54 346.08 95.04 4164.32 1771.39 2210.30 -1483.06 2661.75 326.14 0.52 BP _
MWD+IFR+MS
59 5335.45 45.31 343.91 95.95 4231.66 1797.94 2276.31 -1500.75 2726.51 326.60 1.63 BP _
MWD+IFR+MS
60 5430.70 45.56 343.81 95.25 4298.50 1825.54 2341.50 -1519.62 2791.39 327.02 0.27 BP MWD+IFR+MS
r 1
LJ
•
SCHLUMBERGER Survey Report 27-Nov-2006 10:17:06 Page 4 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
61 5526.30 46.04 343.09 95.60 4365.15 1853.87 2407.19 -1539.14 2857.19 327.41 0.74 BP
MWD+IFR+MS
62 5627.80 45.52 344.90 101.50 4435.94 1883.30 2477.11 -1559.20 2926.97 327.81 1.38 _
BP_MWD+IFR+MS
63 5723.57 45.62 344.36 95.77 4502.99 1910.27 2543.05 -1577.33 2992.50 328.19 0.42 BP_MWD+IFR+MS
64 5819.29 46.08 344.24 95.72 4569.66 1937.73 2609.17 -1595.91 3058.54 328.55 0.49 BP_MWD+IFR+MS
65 5915.41 45.86 345.79 96.12 4636.47 1964.56 2675.92 -1613.78 3124.88 328.91 1.18 BP MWD+IFR+MS
66 6010.47 44.51 347.45 95.06 4703.47 1989.00 2741.52 -1629.40 3189.18 329.28 1.88 BP _MWD+IFR+MS
67
6106.33
44.44
347.23
95.86
4771.87
2012.54
2807.04
-1644.11
3253.09
329.64
0.18
BP -
MWD+IFR+MS •
68 6201.87 44.86 347.20 95.54 4839.84 2036.21 2872.52 -1658.97 3317.16 329.99 0.44 BP _MWD+IFR+MS
69 6297.53 45.22 346.34 95.66 4907.43 2060.57 2938.41 -1674.47 3382.03 330.32 0.74 BP _MWD+IFR+MS
70 6393.26 44.85 347.52 95.73 4975.08 2084.76 3004.39 -1689.78 3446.99 330.64 0.95 BP MWD+IFR+MS
71 6489.42 44.89 346.91 96.16 5043.23 2108.68 3070.55 -1704.80 3512.06 330.96 0.45 BP _MWD+IFR+MS
72 6584.72 44.74 347.71 95.30 5110.84 2132.26 3136.07 -1719.55 3576.56 331.26 0.61 BP MWD+IFR+MS
73 6680.34 44.35 346.90 95.62 5178.99 2155.81 3201.51 -1734.29 3641.07 331.56 0.72 BP _
_MWD+IFR+MS
74 6774.97 44.06 346.61 94.63 5246.82 2179.57 3265.73 -1749.41 3704.78 331.82 0.37 BP MWD+IFR+MS
75 6870.82 43.53 346.13 95.85 5316.01 2203.87 3330.20 -1765.04 3769.03 332.08 0.65 BP _
MWD+IFR+MS
76 6966.78 43.22 345.99 95.96 5385.76 2228.34 3394.16 -1780.91 3833.01 332.31 0.34 BP MWD+IFR+MS
77 7062.22 45.20 348.39 95.44 5454.17 2251.80 3459.04 -1795.64 3897.35 332.57 2.72 BP _
MWD+IFR+MS
78 7157.56 44.85 347.62 95.34 5521.56 2274.71 3525.02 -1809.66 3962.40 332.83 0.68 BP _
_MWD+IFR+MS
79 7253.49 44.38 347.62 95.93 5589.85 2298.02 3590.82 -1824.10 4027.58 333.07 0.49 BP _MWD+IFR+MS
80 7349.16 43.75 347.24 95.67 5658.59 2321.24 3655.77 -1838.58 4092.07 333.30 0.71 BP MWD+IFR+MS
81 7444.53 43.26 347.20 95.37 5727.76 2344.38 3719.79 -1853.10 4155.82 333.52 0.51 BP MWD+IFR+MS .
82 7537.98 43.36 348.84 93.45 5795.76 2366.14 3782.49 -1866.41 4217.91 333.74 1.21 BP _
MWD+IFR+MS
83 7633.24 45.09 350.27 95.26 5864.03 2386.99 3847.83 -1878.44 4281.86 333.98 2.10 _
BP MWD+IFR+MS
84 7729.03 47.12 351.37 95.79 5930.44 2407.21 3915.97 -1889.44 4347.97 334.24 2.27 _
BP MWD+IFR+MS
85 7824.64 49.19 352.28 95.61 5994.22 2426.87 3986.47 -1899.56 4415.91 334.52 2.28 _
BP MWD+IFR+MS
86 7920.31 49.61 353.08 95.67 6056.48 2445.89 4058.52 -1908.81 4484.99 334.81 0.77 BP MWD+IFR+MS
87 8015.64 47.02 350.16 95.33 6119.88 2465.76 4128.93 -1919.15 4553.16 335.07 3.55 _
BP MWD+IFR+MS
88 8111.49 45.27 346.44 95.85 6186.30 2488.86 4196.60 -1933.13 4620.43 335.27 3.34 _
BP MWD+IFR+MS
89 8206.91 44.74 346.22 95.42 6253.76 2513.62 4262.16 -1949.07 4686.67 335.43 0.58 _
BP MWD+IFR+MS
90 8302.26 45.78 345.88 95.35 6320.88 2538.78 4327.89 -1965.40 4753.26 335.58 1.12 _
BP MWD+IFR+MS
SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle .angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
91 8397.62 44.82 346.22 95.36 6387.95 2563.97 4393.67 -1981.74 4819.92 335.72 1.04 BP_MWD+IFR+MS
92 8493.67 45.84 345.68 96.05 6455.48 2589.46 4459.93 -1998.33 4887.16 335.86 1.13 BP_MWD+IFR+MS
93 8589.19 46.00 346.23 95.52 6521.93 2615.06 4526.50 -2014.98 4954.73 336.00 0.45 BP_MWD+IFR+MS
94 8684.94 46.12 346.45 95.75 6588.37 2640.35 4593.50 -2031.26 5022.57 336.14 0.21 BP_MWD+IFR+MS
95 8781.41 46.22 346.54 96.47 6655.18 2665.70 4661.17 -2047.52 5091.05 336.29 0.12 BP MWD+IFR+MS
27-Nov-2006 10:17:06
Page 5 of 9
96 8876.66 45.44 346.85 95.25 6721.54 2690.37 4727.65 -2063.24 5158.26 336.42
97 8971.92 44.70 346.93 95.26 6788.82 2714.51 4793.34 -2078.54 5224.59 336.56
98 9067.52 44.01 347.10 95.60 6857.18 2738.29 4858.46 -2093.55 5290.33 336.69
99 9163.23 42.94 346.74 95.71 6926.63 2761.82 4922.60 -2108.46 5355.15 336.81
100 9258.52 44.73 346.18 95.29 6995.36 2785.91 4986.76 -2123.91 5420.22 336.93
101 9354.25 44.97 346.71 95.73 7063.23 2810.56 5052.39 -2139.73 5486.82 337.05
102 9449.04 44.21 346.89 94.79 7130.74 2834.47 5117.18 -2154.93 5552.41 337.16
103 9544.30. 44.40 343.55 95.26 7198.92 2860.08 5181.50 -2171.90 5618.28 337.26
104 9640.22 46.31 338.39 95.92 7266.34 2890.97 5245.95 -2194.19 5686.34 337.30
105 9736.55 46.23 332.15 96.33 7332.96 2928.42 5309.11 -2223.28 5755.84 337.28
106 9831.35
107 9927.64
108 10023.08
109 10118.72
110 10214.21
111 10309.87
112 10406.60
113 10502.55
114 10598.39
115 10694.43
116 10789.52
117 10885.55
118 10980.47
119 11076.17
120 11172.09
45.44 326.91
44.78 322.31
43.87 319.96
43.05 314.54
43.27 310.71
42.64 310.64
42.04 310.84
41.34 311.24
40.19 311.19
40.17 310.22
41.83 310.55
44.30 309.60
45.80 308.06
44.55 307.65
43.24 306.71
94.80 7399.04 2970.55 5367.69 -2257.72 5823..18 337.19
96.29 7467.01 3017.26 5423.29 -2297.19 5889.75 337.04
95.44 7535.29 3065.79 5475.21 -2339.02 5953.90 336.87
95.64 7604.74 3116.58 5523.50 -2383.63 6015.87 336.66
95.49 7674.40 3170.22 5567.71 -2431.67 6075.56 336.41
95.66 7744.42 3225.00 5610.20 -2481.11 6134.35 336.14
96.73 7815.91 3279.72 5652.71 -2530.47 6193.26 335.88
95.95 7887.56 3333.13 5694.61 -2578.61 6251.23 335.64
95.84 7960.15 3385.40 5735.85 -2625.68 6308.26 335.40
96.04 8033.53 3437.46 5776.25 -2672.65 6364.60 335.17
95.09 8105.29 3490.05 5816.68 -2720.17 6421.29 334.94
96.03 8175.44 3545.53 5858.88 -2770.35 6480.84 334.69
94.92 8242.50 3603.13 5900.98 -2822.68 6541.34 334.44
95.70 8309.97 3661.92 5942.64 -2876.27 6602.11 334.17
95.92 8379.09 3719.90 5982.83 -2929.25 6661.44 333.91
0.85 BP_MWD+IFR+MS
0.78 BP_MWD+IFR+MS
0.73 BP_MWD+IFR+MS
1.15 BP_MWD+IFR+MS
1.92 BP MWD+IFR+MS
0.46 BP_MWD+IFR+MS
0.81 BP_MWD+IFR+MS
2.46 BP_MWD+IFR+MS
4.31 BP_MWD+IFR+MS
4.68 BP MWD+IFR+MS
4.05 BP_MWD+IFR+MS
3.45 BP_MWD+IFR+MS
1.97 BP_MWD+IFR+MS
3.99 BP_MWD+IFR+MS
2.75 BP_MWD+IFR+MS
0.66 BP_MWD+IFR+MS
0.64 BP_MWD+IFR+MS
0.78 BP_MWD+IFR+MS
1.20 BP_MWD+IFR+MS
0.65 BP MWD+IFR+MS
1.76 BP_MWD+IFR+MS
2.66 BP_MWD+IFR+MS
1.95 BP_MWD+IFR+MS
1.34 BP_MWD+IFR+MS
1.53 BP MWD+IFR+MS
•
SCHLUMBERGER Survey Report
27-Nov-2006 10:17:06
Page 6 of 9
---
Seq --------
Measured ------
Incl -------
Azimuth ------
Course --------
TVD --------
Vertical -------
Displ ---------
Displ -------
Total --------
At -----
DLS - ---- ------
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
121 11267.19 43.11 305.18 95.10 8448.44 3777.30 6021.03 -2981.93 6718.98 333.65 l.ll BP _MWD+IFR+MS
122 11362.83 43.79 304.55 95.64 8517.87 3835.90 6058.63 -3035.90 6776.70 333.39 0.84 BP _MWD+IFR+MS
123 11431.27 45.61 305.03 68.44 8566.52 3878.82 6086.09 -3075.43 6819.00 333.19 2.70 BP _MWD+IFR+MS
124 11512.76 44.06 308.87 81.49 8624.32 3929.02 6120.60 -3121.34 6870.55 332.98 3.83 BP _MWD+IFR+MS
125 11543.99 46.55 308.89 31.23 8646.28 3948.04 6134.53 -3138.62 6890.82 332.90 7.97 BP MWD+IFR+MS
126 11576.34 49.76 313.26 32.35 8667.86 3968.18 6150.37 -3156.76 6913.19 332.83 14.13 BP _MWD+IFR+MS
127 11607.50 51.87 312.73 31.16 8687.55 3987.93 6166.84 -3174.43 6935.92 332.76 6.90 BP _MWD+IFR+MS
128 11639.10 54.46 315.00 31.60 8706.49 4008.38 6184.37 -3192.65 6959.85 332.70 10.01 BP _MWD+IFR+MS
129 11670.83 57.08 313.80 31.73 8724.34 4029.46 6202.72 -3211.40 6984.75 332.63 8.83 BP _MWD+IFR+MS
130 11702.48 59.51 312..03 31.65 8740.98 4051.50 6221.05 -3231.12 7010.10 332.55 9.03 BP MWD+IFR+MS
131 11734.56 61.03 310.70 32.08 8756.88 4074.73 6239.45 -3252.03 7036.08 332.47 5.95 BP _MWD+IFR+MS
132 11766.78 62.49 307.78 32.22 8772.13 4098.96 6257.40 -3274.01 7062.17 332.38 9.18 BP _MWD+IFR+MS
133 11798.75 64.41 305.68 31.97 8786.42 4124.01 6274.50 -3296.93 7087.96 332.28 8.40 BP _MWD+IFR+MS
134 11830.43 66.15 302.91 31.68 8799.67 4149.77 6290.71 -3320.70 7113.37 332.17 9.66 BP _MWD+IFR+MS
135 11862.23 68.40 298.61 31.80 8811.96 4176.79 6305.70 -3345.90 7138.41 332.05 14.34 BP MWD+IFR+MS
136 11894.58 70.54 297.64 32.35 8823.31 4205.20 6319.98 -3372.62 7163.56 331.91 7.19 BP _MWD+IFR+MS
137 11926.05 72.74 299.18 31.47 8833.22 4233.17 6334.19 -3398.89 7188.49 331.78 8.39 BP _MWD+IFR+MS
138 11957.83 75.14 297.75 31.78 8842.01 4261.75 6348.74 -3425.73 7214.02 331.65 8.70 BP _MWD+IFR+MS
139 11989.71 77.60 298.43 31.88 8849.52 4290.82 6363.33 -3453.06 7239.86 331.51 7.99 BP _MWD+IFR+MS
140 12016.38 79.41 300.82 26.67 8854.84 4315.09 6376.25 -3475.78 7262.06 331.40 11.10 BP MWD+IFR+MS
141 12048.79 81.59 299.32 32.41 8860.19 4344.68 6392.26 -3503.44 7289.38 331.27 8.13 BP _MWD+IFR+MS
142 12080.95 84.69 298.67 32.16 8864.03 4374.46 6407.74 -3531.36 7316.39 331.14 9.85 BP MWD+IFR+MS
143 12112.74 86.20 297.42 31.79 8866.55 4404.20 6422.63 -3559.33 7342.96 331.01 6.16 BP _
_MWD+IFR+MS
144 12144.09 86.74 294.67 31.35 8868.48 4433.92 6436.37 -3587.44 7368.62 330.87 8.92 BP MWD+IFR+MS
145 12176.19 87.88 292.69 32.10 8869.99 4464.77 6449.25 -3616.80 7394.19 330.72 7.11 BP MWD+IFR+MS
146 12207.07 87.68 290.93 30.88 8871.19 4494.72 6460.71 -3645.45 7418.23 330.57 5.73 BP _MWD+IFR+MS
147 12239.59 86.95 286.45 32.52 8872.71 4526.62 6471.12 -3676.21 7442.44 330.40 13.94 BP _MWD+IFR+MS
148 12271.63 87.54 283.00 32.04 8874.25 4558.38 6479.25 -3707.16 7464.83 330.22 10.91 BP _MWD+IFR+MS
149 12302.04 87.90 280.62 30.41 8875.46 4588.70 6485.47 -3736.90 7485.04 330.05 7.91 BP _MWD+IFR+MS
150 12335.10 88.85 277.74 33.06 8876.40 4621.73 6490.74 -3769.52 7505.93 329.85 9.17 BP MWD+IFR+MS
•
i
t
SCHLUMBERGER Survey Report 27-Nov-2006 10:17:06 Page 7 of 9
---
Seq --------
Measured ------
Incl -------
Azimuth ------
Course -------
TVD - --------
Vertical -------
Displ ---------
Displ -------
Total --------
At -----
DLS - ---- ------
Srvy Tool
# depth angle .angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
-
--- (ft)
-------- (deg)
------ (deg)
------- (ft)
------ (ft)
------- (ft)
- -------- (ft)
------- (ft)
--------- (ft)
------- (deg)
-------- 100f)
-----
- type (deg)
---- ------
---
151 --------
12367.37 ------
88.44 -------
274.22 ------
32.27 -------
8877.16 - --------
4653.97 -------
6494.10 ---------
-3801.60 -------
7524.99 --------
329.66 -----
10.98 -
BP ---- ------
_MWD+IFR+MS
152 12398.75 88.19 270.42 31.38 8878.08 4685.18 6495.37 -3832.94 7541.97 329.46 12.13 BP _MWD+IFR+MS
153 12431.60 87.25 267.91 32.85 8879.39 4717.63 6494.89 -3865.75 7558.29 329.24 8.15 BP _MWD+IFR+MS
154 12463.18 87.13 267.58 31.58 8880.94 4748.68 6493.65 -3897.27 7573.39 329.03 1.11 BP _MWD+IFR+MS
155 12494.76 85.44 266.54 31.58 8882.98 4779.63 6492.04 -3928.74 7588.25 328.82 6.28 BP MWD+IFR+MS
156 12527.04 82.80 267.01 32.28 8886.29 4811.14 6490.23 -3960.80 7603.36 328.61 8.31 BP MWD+IFR+MS
157
12559.46
80.36
266.14
32.42
8891.04
4842.59
6488.31
-3992.81
7618.45
328.39
7.98
BP -
MWD+IFR+MS •
158 12591.21 80.21 265.57 31.75 8896.40 4873.20 6486.05 -4024.02 7632.93 328.18 1.83 BP _MWD+IFR+MS
159 12622.65 80.54 264.54 31.44 8901.65 4903.42 6483.38 -4054.90 7646.99 327.98 3.40 BP _MWD+IFR+MS
160 12654.18 80.47 264.57 31.53 8906.85 4933.69 6480.43 -4085.86 7660.96 327.77 0.24 BP MWD+IFR+MS
161 12686.17 80.28 265.17 31.99 8912.20 4964.42 6477.61 -4117.27 7675.38 327.56 1.94 BP MWD+IFR+MS
162 12717.88 80.47 266.13 31.71 8917.50 4994.98 6475.24 -4148.45 7690.15 327.35 3.04 BP _MWD+IFR+MS
163 12750.14 80.68 266.50 32.26 8922.79 5026.16 6473.19 -4180.21 7705.61 327.15 1.31 BP _MWD+IFR+MS
164 12782.20 80.89 265.97 32.06 8927.92 5057.15 6471.12 -4211.78 7721.04 326.94 1.76 BP _MWD+IFR+MS
165 12813.31 80.96 266.43 31.11 8932.83 5087.24 6469.08 -4242.44 7736.10 326.74 1.48 BP MWD+IFR+MS
166 12845.30 81.03 266.19 31.99 8937.83 5118.20 6467.05 -4273.97 7751.74 326.54 0.77 BP _MWD+IFR+MS
167 12876.63 80.99 267.14 31.33 8942.73 5148.55 6465.25 -4304.86 7767.32 326.34 3.00 BP _MWD+IFR+MS
168 12908.58 80.91 266.37 31.95 8947.76 5179.51 6463.46 -4336.36 7783.34 326.14 2.39 BP _MWD+IFR+MS
169 12940.61 81.17 266.74 32.03 8952.74 5210.54 6461.56 -4367.94 7799.40 325.94 1.40 BP _MWD+IFR+MS
170 12971.70 81.30 267.86 31.09 8957.48 5240.74 6460.11 -4398.64 7815.44 325.75 3.58 BP MWD+IFR+MS
171 13004.28 81.11 267.68 32.58 8962.46 5272.44 6458.86 -4430.81 7832.55 325.55 0.80 BP _MWD+IFR+MS •
172 13036.59 83.21 267.25 32.31 8966.87 5303.92 6457.44 -4462.78 7849.52 325.35 6.63 BP _MWD+IFR+MS
173 13068.24 83.73 268.54 31.65 8970.47 5334.89 6456.29 -4494.21 7866.48 325.16 4.37 BP _MWD+IFR+MS
174 13100.37 84.90 266.46 32.13 8973.65 5366.34 6454.89 -4526.14 7883.63 324.96 7.40 BP _MWD+IFR+MS
175 13131.27 88.30 268.12 30.90 8975.48 5396.66 6453.43 -4556.95 7900.17 324.7.7 12.24 BP MWD+IFR+MS
176 13163.52 91.24 266.97 32.25 8975.61 5428.38 6452.05 -4589.17 7917.67 324.58 9.79 BP _MWD+IFR+MS
177 13195.78 92.91 268.79 32.26 8974.45 5460.13 6450.86 -4621.38 7935.41 324.38 7.65 BP _MWD+IFR+MS
178 13227.41 96.05 268.88 31.63 8971.98 5491.27 6450.22 -4652.90 7953.29 324.20 9.93 BP MWD+IFR+MS
179 13259.29 97.40 269.19 31.88 8968.24 5522.56 6449.69 -4684.56 7971.42 324.01 4.34 BP _
_MWD+IFR+MS
180 13291.29 97.23 270.26 32.00 8964.17 5553.98 6449.53 -4716.30 7989.99 323.82 3.36 BP MWD+IFR+MS
SCHLUMBERGER Survey Report
27-Nov-2006 10:17:06
Page 8 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle .angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
181 13323.45 97.05 269.74 32.16 8960.17 5585.59 6449.53 -4748.21 8008.87 323.64 1.70 BP MWD+IFR+MS
182 13354.74 96.99 269.07 31.29 8956.35 5616.30 6449.21 -4779.26 8027.06 323.46 2.13 BP _
MWD+IFR+MS
183 13387.08 97.06 269.74 32.34 8952.39 5648.05 6448.88 -4811.36 8045.94 323.27 2.07 BP _
MWD+IFR+MS
184 13419.30 96.93 270.93 32.22 8948.47 5679.76 6449.06 -4843.34 8065.25 323.09 3.69 BP _
MWD+IFR+MS
185 13450.66 97.36 271.39 31.36 8944.57 5710.66 6449.69 -4874.45 8084.48 322.92 2.00 BP _
MWD+IFR+MS
186 13482.80 97.21 271.52 32.14 8940.49 5742.34 6450.50 -4906.32 8104.38 322.74 0.62 BP MWD+IFR+MS
187 13514.48 97.53 271.76 31.68 8936.43 5773.58 6451.40 -4937.72 8124.14 322.57 1.26 BP _
MWD+IFR+MS
188 13545.98 97.40 272.27 31.50 8932.34 5804.65 6452.50 -4968.94 8144.02 322.40 1.66 BP _
MWD+IFR+MS
189 13578.60 97.32 272.18 32.62 8928.16 5836.84 6453.76 -5001.26 8164.78 322.23 0.37 BP _
MWD+IFR+MS
190 13610.60 98.37 272.11 32.00 8923.79 5868.38 6454.94 -5032.94 8185.16 322.06 3.29 BP _
MWD+IFR+MS
191 13642.00 98.65 272.88 31.40 8919.14 5899.30 6456.30 -5063.96 8205.33 321.89 2.58 BP MWD+IFR+MS
192 13674.07 98.68 273.64 32.07 8914.31 5930.90 6458.10 -5095.62 8226.32 321.73 2.34 BP _
MWD+IFR+MS
193 13705.72 98.25 273.42 31.65 8909.65 5962.12 6460.03 -5126.86 8247.22 321.56 1.52 BP _
MWD+IFR+MS
194 13737.67 98.20 273.69 31.95 8905.08 5993.65 6461.99 -5158.42 8268.41 321.40 0.85 BP _
MWD+IFR+MS
195 13769.15 98.23 273.38 31.48 8900.58 6024.72 6463.91 -5189.52 8289.34 321.24 0.98 BP _
MWD+IFR+MS
196 13801.71 97.26 272.49 32.56 8896.19 6056.86 6465.56 -5221.74 8310.84 321.07 4.03 BP MWD+IFR+MS
197 13832.95 96.95 272.46 31.24 8892.33 6087.72 6466.90 -5252.71 8331.37 320.91 1.00 BP _
MWD+IFR+MS
198 13866.19 97.48 271.66 33.24 8888.16 6120.53 6468.08 -5285.67 8353.11 320.74 2.87 BP _
MWD+IFR+MS
199 13898.25 97.86 272.14 32.06 8883.88 6152.13 6469.14 -5317.42 8374.05 320.58 1.90 BP _
MWD+IFR+MS
200 13929.76 98.09 273.54 31.51 8879.50 6183.22 6470.68 -5348.59 8395.07 320.42 4.46 BP _
MWD+IFR+MS
201 13961.64 98.52 272.88 31.88 8874.90 6214.66 6472.45 -5380.08 8416.53 320.27 2.45 BP MWD+IFR+MS
202 13993.67 99.06 273.79 32.03 8870.00 6246.21 6474.29. -5411.68 8438.17 320.11 3.27 BP _
MWD+IFR+MS
203 14025.33 99.00 274.12 31.66 8865.04 6277.41 6476.45 -5442.88 8459.86 319.96 1.05 BP _
MWD+IFR+MS
204 14057.25 99.18 273.75 31.92 8859.99 6308.85 6478.61 -5474.32 8481.78 319.80 1.28 BP _
MWD+IFR+MS
205 14089.79 99.48 274.13 32.54 8854.72 6340.89 6480.82 -5506.36 8504.17 319.65 1.48 BP _
MWD+IFR+MS
206 14121.40 98.20 272.74 31.61 8849.86 6372.03 6482.69 -5537.53 8525.81 319.50 5.94 BP MWD+IFR+MS
207 14153.18 97.72 272.94 31.78 8845.46 6403.38 6484.25 -5568.97 8547.45 319.34 1.63 BP _
MWD+IFR+MS
208 14185.12 97.80 273.09 31.94 8841.15 6434.92 6485.91 -5600.57 8569.33 319.19 0.53 BP _
MWD+IFR+MS
209 14216.74 97.84 273.32 31.62 8836.84 6466.14 6487.66 -5631.85 8591.13 319.04 0.73 BP _
_MWD+IFR+MS
210 14249.11 98.17 272.86 32.37 8832.34 6498.08 6489.39 -5663.86 8613.45 318.89 1.74 BP MWD+IFR+MS
J
•
SCHLUMBERGER Survey Report 27-Nov-2006 10:17:06 Page 9 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
211 14281.29 97.79 273.84 32.18 8827.87 6529.85 6491.25 -5695.67 8635.80 318.74 3.24 BP_MWD+IFR+MS
212 14313.23 98.30 274.73 31.94 8823.40 6561.42 6493.62 -5727.21 8658.40 318.59 3.19 BP_MWD+IFR+MS
213 14344.97 97.74 273.16 31.74 8818.97 6592.77 6495.78 -5758.56 8680.79 318.44 5.21 BP_MWD+IFR+MS
214 14376.34 97.95 272.22 31.37 8814.69 6623.72 6497.24 -5789.60 8702.50 318.30 3.04 BP MWD+IFR+MS
215 14407.92 98.08 271.29 31.58 8810.29 6654.81 6498.19 -5820.86 8724.04 318.15 2.95 BP MWD+IFR+MS
216 14427.32 98.75 271.44 19.40 8807.45 6673.88 6498.65 -5840.04 8737.19 318.06 3.54 Projected to TD •
[(c)2006 IDEAL ID10 2C O1]
n
~J
• •
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken
Well No V-04 Date Dispatched: 6-Mar-07
Installation/Rig Nabors 9ES Dispatched By: Nate Rose
LWD Log Delivery V1.1, 10-02-03
Data No Of Prints No of Floppies
Surveys 2 1
Received By: Please sign and return to:
Drilling & Measurements LWD Division
3 2525 Gambell Street, Suite 400
~
Anchorage, Alaska 99501
" -- '
nroselCc3slb.com
Fax:907-561-8317
d,ob-~3y
•
~,, ~ ~ ~:
ALASS-A OIL A1~TD GAS
CO1~t5ERQATIOI~T COMbII5SIOrT
Robert Tirpack
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
FRANK H. MURKOWSKI, GOVERNOR
333 W. T" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU V-04
BP Exploration (Alaska) Inc.
Permit No: 206-134
Surface Location: 4863' FSL, 1678' FEL, SEC. 11, T 11 N, R 11 E, UM
Bottomhole Location: 733' FSL, 2104' FEL, SEC. 34, T12N, R11E, UM
Dear Mr. Tirpack:
Enclosed is the approved application for permit to drill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field inst~ector at (907) 659-3607 (pager).
DATED this~day of September, 2006
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALAS IL AND GAS CONSERVATION COMMIS~N
PERMIT TO DRILL
20 AAC 25.005
1a. Type of work 1b. Current Well Class ^ Exploratory ^ DevelopmentGas 1c. Specify if well is propr~fpG'QE
® Drill ^ Redrill ^ Servi ce ^ Multiple Zone ^ Coalbed Methane ^ as ates
^ Re-Entry ^ Stratigraphic Test ®Development Oil ^ Single Zone ^ Shale Gas
2. Operator Name: 5. Bond: ®Blanket ^ Single Well 11. Well Name and Number:
BP Exploration (Alaska) Inc. Bond No. 6194193 PBU V-04 ~
3. Address: 6. Proposed Depth: 12. Field /Pool(s):
P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 14282 TVD 8746 Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section): 7. Property Designation: Pool
Surface: ADL 028239
4863' FSL
1678' FEL
SEC
11
T11 N
R11 E
UM
,
,
,
.
,
,
Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spu ,ate:
706' FSL, 5097' FEL, SEC. 35, T12N, R11 E, UM October , 2006
Total Depth: 9. Acres in Property: 14. Distance to Nearest Property:
733' FSL, 2104' FEL, SEC. 34, T12N, R11 E, UM 2560 8650'
4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation Plan 15. Distance to Nearest Well Within Pool:
Surface: x-590623 y- 5970111 Zone-ASP4 (Height above GL): g1.4 feet 715'
16. Deviated Wells: Kickoff Depth: 500 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole An ie: 98 de rees Downhole: 3910 Surface: 3024
18. Casin Pr ram: S cificatio ns "To - Settin De Sh -Bo ttom uantit of Dement c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
42" 20" 215.5# A-53 Weld 80' Surface Surface 108' 108' 260 sx Arctic Set A rox.
12-1/4" 9-5/8" 40# L-80 BTC 3098' Surface Surface 3126' 2683' 500 sx AS Lite 473 sx Class'G'
8-3/4" 7" 26# L-80 TC-II 6393' Surface Surface 6421' 5022' 172 sx Li eCrete 528 sx Class ' '
8-3/4" 7" 26# L-80 BTC-M 5127' 6421' 5022' 11548' 8668' 387 sx Class 'G'
6-1/8" 4-1/2" 12.6# 13Cr Vam To 2884' 11398' 8559' 14282' 8829' 318 sx Class 'G' i
1 g, PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured):
Easing Length Size. Cement Volume MD TVD'
Conductor /Structural
Surface
Intermediate
Producti n
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft):
20. Attachments ®Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Brandon Peltier, 564-5912
Printed Name Robert Tirpack Title Senior Drilling Engineer
Si nature ~ Prepared By Name/Number:
Phone 564-4166 Date ~/9 ~6 Terrie Hubble, 564-4628
.Commission Use Onl
Permit To Drill API Number:
' 2 ~
3
g-' 2
d~ Permit pr val See cover letter for
` ~~
Number: - 50-
- J
-
~ other re uirements
Date:
Conditions of Approval:
f
h
l
I
box is checked, well may not be used to expl es:
ore for, test, or produce coalbed methane, gas hydrates, or gas contained s
a
ff
` ~
~ e ST ~ ~ ~ ~ .>! O ~ DOO ~ Sic Samples Req'd: ^ Yes ,~No Mud Log Req'd: ^ Yes ~No
. HzS Measures: ,Yes ^ No Directional Survey Req'd: Yes ^ No
Other: 1 LL
t7 ~ t ~ h~ ~ t ~
t Co 20 /~4}-L 25
Y i itu~
a
(~ ~~ ~'s h7(l~~
~C ~ ~ ~C t° S ~~
~ ~ ~/ vuc
,
~
u,
. .
D
~ APPROVED BY THE COMMISSION
~ ~
ate ,COMMISSIONER
~E EIVE~~~
~~P 2 0 200
~s~3 Uil ~ ~ n
Form 10-401 Revised 12!2005 ~ ~ ~ ('~ ~ ~R\' r /(f`~ /v ~ ~.-~ Submit In Duplicate
a •
Well Name: V-04
Drill and Complete Plan Summary
T e of Well service / roducer / in'ector : Horizontal Producer
Tar et X Y Z TVDss Townshi Ran a Section FSL FEL
Surface As-built 590623 5970111 0 11 N 11 E 11 4863 1678
T ti : TSGR 587398 5976250 8580 12N 11 E 35 480.7 4822.2
T t2: TSAD 587120 5976472 8774 12N 11 E 35 706.1 5097.3
BHL: TSAD 584834 5976473 8746 12N 11 E 34 732.9 2103.6
AFE Number: PBDxxxxxx API Number: TBD
Estimated Start Date: October 20, 2006 Operatin days: 26 Ri Nabor E
TMD 14,282' TVD rkb: 8,829' RKB/GL 28.5'/52.9' RTE 81.4'
Well Design: USH Grassroots Ivishak Zone 4 Horizontal Producer.
4-~/2" 13-Cr Vam To com letion.
Current Status: New drill, no conductor set
General Well Information:
Estimated BHP: 3910 psi at 8900' TVDss '
Estimated BHT: 238 deg F at 8900' TVDss
Formation Markers:
Est.
Formation
Tops Est.
Formation
Tops Uncertainty Commercial
Hydrocarbon
Bearing Est. Pore
Press. Est. Pore
Press.
Formation MD (TVDss) (feet) (Yes/No) (Psi) (ppg EMW)
G1 328 -245 +/-30' No 113 8.8
SV6 976 -890 +/-30' No 409 8.8
EOCU 1587 -1455 +/-30' No 669 8.8
SV5 1689 -1540 +/-30' No 708 8.8
SV4 1851 -1670 +/-30' No 768 8.8
BPRF 1896 -1705 +/-30' Gas Hydrates 784 8.8
SV3 2369 -2050 +/-30' Gas Hydrates 943 8.8
SV2 2610 -2225 +/-30' Gas Hydrates 1024 8.8
SVl 2988 -2535 +/-30' Gas Hydrates 1166 8.8
UG4 3440 -2830 +/-30' Thin Coal 1302 8.8
UG4A 3484 -2862 +/-30' Yes -Heavy Oil 1317 8.8
UG3 3930 -3185 +/-30' Coal; minor
Heavy Oil 1465 8.8
Fault #1 (V-Pad Fault) 4448 -3550 +/- 150'
UG1 4590 -3650 +/-50' Yes -Heavy Oil 1675 8.8
Ma 4903 -3870 +/-30' Yes -Heavy Oil 1760 8.7
Mb1 4966 -3915 +/-30' Yes -Heavy Oil 1780 8.7
Mb2 5059 -3980 +/-30' Yes -Heavy Oil 1805 8.7
MC 5137 -4035 +/-30' Yes -Heavy Oil 1830 8.7
V-04 Permit application Page 1
•
•
Na 5236 -4105 +/-30' No 1855 8.7
Nb 5272 -4130 +/-30' Yes 1860 8.7
Nc 5314 -4160 +/-30' Yes 1875 8.7
OA 5463 -4265 +/-30' Yes 1800-1910 8.1-8.6
OBa 5556 -4330 +/-30' Yes 1820-1935 8.2-8.6
OBb 5612 -4370 +/-30' Yes 1.920-1960 8.4-8.6
OBc 5690 -4425 +/-30' Yes 1980 8.6
OBd 5754 -4470 +/-30' Yes 1900-2000 8.2-8.6
OBe 5847 -4535 +/-30' Yes 2060 8.7
OBf 5903 -4575 +/-30' Yes 2080 8.7
OBf_Base 5960 -4615 +/-30' No 2095 8.7
CM-2 6421 -4940 +/-30'
CM-1 7400 -5630 +/-30' No
THRZ 8188 -6185 +/-30' No
TKLB 8458 -6375 +/-30'
K-1 8500 -6405 +/-30' No
TKD 8550 -6440 +/-30' Yes 3370 10.1
TKC4 8586 -6465 +/-30' Yes 3375 10.2
LCU 8735 -6570 +/-30' No
TMLV 9012 -6765 +/-30' No
TKNG 10234 -7640 +/-30'
TJ F 10387 -7750 +/-30' No
TJE 10839 -8075 +/-30'
TJD 11068 -8240 +/-30'
Fault #2 11242 -8365 +/-100'
TJC (faulted) 11395 -8475 +/-50'
TJB 11409 -8485 +/-30'
TJA 11450 -8515 +/-30'
TSGR 11548 -8585 +/-30' Yes 3650 8.7
TSHUA 11605 -8625 +/-30'
TSHUB 11725 -8695 +/-30'
TSHUC 11769 -8715 +/-30'
TSHUD 11836 -8740 +/-30'
TEIL 11883 -8755 +/-30'
TSAD 11954 -8774 +/-30' Yes 3865 8.5
45P 12113 -8805 +/-30' Yes 3875 8.5
44P 12648 -8840 +/-30' Yes 3885 8.5
43P 12832 -8870 +/-30' Yes 3895 8.4
42P 13002 -8900 +/-30' Yes 3910 8.4
INVERT 13132 -8905 +/-30' Yes
43P (Inverted Top) -8870 +/-30' Yes
Fault #3 13500 -8858 +/-100' Yes
43P (Inverted Top) -8840 +/-30' Yes
44 (Inverted Top) -8805 +/-30' Yes
45P (Inverted Top) -8770 +/-30' Yes
TD 14282 -8746 +/-30' Yes
ZC.']
~~.Z
V-04 Permit application Page 2
• •
Casing/Tubing Program:
Hole Size Csg/
Tbg O.D. Wt/Ft Grade Connection Length
(ft) Top
MD/TVD
RTE ft Btm
MDlTVD
RTE ft
42" Insulated 20" 215.5 A-53 WLD 80 GL 108/108
12-'/a" 9-5/8" 40 L-80 BTC 3098 GL 3126/2683
8-3/a" 7" 26 L-80 TC-II 6393 GL 6421/5022
8-3/a" 7" 26 L-80 BTC-M 5127 6421 /5022 11548/8668
6-%6" 4-'/z" 12.6 13-Cr VT 2884 11398/8559 14282/8829
Tubin 4-'/z" 12.6 13-Cr VT 11398 GL 11398/8559
Directional
Directional Plan: Schlumber er P6b
KOP: 500' MD, be in 1.5/100 build
Close A roach Wells: All Wells ass Ma'or Risk Scan, reference P6b anti-collision re ort
Surve Pro ram: MWD + IFR + MS
Maximum Hole An le: 98 de rees at TD of roduction hole
Distance to Nearest Pro ert Line: 8650' to the West
Distance to Nearest Well in Pool: 715' from L-01 at toe TD
Mud Program:
12-'/a" Surface Hole Mud Pro erties Spud -Freshwater Mud
Interval Densit PV YP PH Funn Vis FL
0-1896' BPRF 8.8-9.2 20-45 50 - 70 9.0 - 9.5 300 NC - 8
1896'-3126' SVi 9.0-9.5 20-45 45 - 60 9.0 - 9.5 200-300 < 7.5
8-3/a" Intermediate Hole Mud Pro erties Freshwater Mud (LSND)
Interval Densit PV YP PH API Filtrate MBT
3126'-8189' THRZ 8.8-9.2-, 12-18 20 - 26 9.0-9.5 4 - 7 < 15
8189'-9012' TMLV 1 ~ 14-22 18 - 25 9.0-9.5 HTHP < 10 < 20
9012'-11548' TSGR 1.2 14-22 18 - 25 9.0-9.5 HTHP < 10 < 20
6-'/e" Production Hole Mud Pro erties FloPro-NT
Interval De 'ty PV YP PH HTHP 0235° LG Solids
11548'-14282' TSAD 5-8 22-32 8.5-9.0 < 8 <3
Survev and Loaaina Proaram:
.:~-
12-'/a" Hole Section: Surface Gyro until MWD surveys are clean.
MWD /LWD: Dir/GR
O en Hole: None
Cased hole: None
8-3/a" Hole Section: Sample as required by well site Geologist
MWD /LWD: GR/RES/PWD real time
O en Hole: None
Cased Hole: None required
6-'/a" Hole Section: Sample as required by well site Geologist
MWD /LWD: GR/RES/PWD
O en Hole: None
Cased Hole: None
V-04 Permit application Page 3
• •
Cement Calculations:
Casin Size Surface Casing - 9 5/e" 40 Ib/ft L-80 BTC -Single Stage
Basis Lead: Open hole volume + 250% excess in permafrost and 40% excess below permafrost. TOC at
surface
Tail: O en hole volume + 40% excess + 80' shoe track. TOC 1000' MD above shoe 2126' MD
Fluid Sequence and Tam Port collar located at 1,000' as a contingency for cement to surface
Volume:
Wash None
3 acer 80 bbls of ush II wei hted to 10.0
Lead 396 bbls ks 10.7 Ib/ al Arctic Set Li a cement - .4 i.
Tail 85 bbls ks) 15.8 Ib/gal Class G - .15fcuft/sk
Temp I BHST = 90° F from SOR. BHCT 60° F
Casin Size Intermediate Casing - 7" 26 Ib/ft L-80 BTC-M x TC-II -Two Stage
Basis Stage 1:
Lead: Open hole volume + 30% excess. TOC at K-1 (8500' MD)
Tail: Open hole volume + 30% excess + 80' shoe track. TOC at CM2 (6421' MD)
Stage 2:
Lead: None
Tail: O en hole volume + 30% excess. TOC 1000' below Surface Shoe 12 MD
Fluid Sequence and This cement job is planned for two stages. A stage to ~ ill be placed in the CM2
Volume: (6421' MD).
1$ Sta e
Wash None
S acer 70 bbl of PUSH XL S acer wei hted to 11.7-Ib/ al
Lead 73 bbl 17 12.5 LiteCRETE + Latex + Silica - .3 uft/s
Tail 109 bbl 28 sl 15.8 ppa Class G cement + Latex + Si ica - .16 uft/sk
Wash None
S acer 40 bbl of MUDPUSH XL S acer wei hted to 11.7-Ib/ al
Lead NA ._ .a...
Tail 180 bbl f387Rsks1 15.8 ppa Class G cement + Latex - /i.16~uft/sk
1 Temp (BHST = 238° F for first stage. BHST = 145° F for second stage
Casin Size Production Liner - 4-~/z" 12.6 Ib/ft 13-Cr Vam Top -Single Stage
Basis Lead: Open hole volume + 30% excess + 150' of liner lap + 80' shoe track + 200' of 7" x 4" DP annulus
volume. TOC at liner top (11398' MD)
Total Cement Volume: Wash None
S acer 40 bbls of d ush I I Wei hted to 13
Tail 68 bbls 1 sks 15.8 Ib/ al Class G Cement + Silica + Latex 1. cuft/sk
Temp BHST = 238° F from SOR, BHCT 160° F estimated by Dowell
Surface and Anti-Collision Issues:
• Surface Shut-in Wells: V-105 and V-106 will need to be shut-in and have well houses removed for the rig
move on and off V-04.
• Close Approach Shut-in Wells: All wells have passed the major risk scan. No wells will require
subsurface shut-in during drilling operations. Reference the Anti-collision report in the directional plan for a
full list of offset well paths.
V-04 Permit application Page 4
• •
Well Control
Surface hole will be drilled with a diverter. The intermediate and production hole sections will be drilled with well
control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer. ~`~
This equipment is capable of handling maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 4,000 psi. Due to anticipated surface pressures exceeding 3,OOOpsi it will be
necessary to have two sets of pipe rams installed at all times.
Diverter, BOPE and drilling fluid sy
Surface Section
• BOPE:
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 9-5/8" Casing Test:
• Kick Tolerance:
stem schematics on file with the AOGCC.
Hydril GK, 21-1/4", 2000 psi
1,166 psi - SV1 (8.8 ppg EMW C 2535' TVDss)
913 psi -Based on a full column of gas @ 0.10 psi/ft
Function Test
3,500 psi surface pressure test
NA
Intermediate Section Kick Tolerance and Intearitv Testin
• BOPE: Hydril, 13-5/8", 5000 psi
• Maximum anticipated BHP: 3,883 psi -Top Sag River (8.7 ppg EMW C~ 8585' TVDss)
• Maximum surface pressure: 4 si -Based on a full column of gas @ 0.10 psi/ft /
p
• Planned BOP test pressure: 4,OO
p
si/250 psi Rams and 2,500 psi/250 psi Annular
• 9-5/8" Casing Test: ,
00 psi surface pressure test
• Integrity Test - 8-3/4" hole: LOT_20' - 50' from 9 5/e' shoe
• Kick Tolerance: 3 bbl KT with a 10.7 ppg mud and a 12.2 ppg LOT
Production Section Kick Tolerance and Intearitv Testing
• ROPE: Hydril., 13-5/8", 5000 psi
• Maximum anticipated BHP: 3,910 psi - Ivishak 42P (8.4 ppg C«~ 8900' TVDss)
• Maximum surface pressure: 3, ^psi -Based on a full column of gas @ 0.10 psi/ft
• Planned BOP test pressure: ,OOO psi/250 psi Rams and 2,500 psi/250 psi Annular
• 41/z" Casing Test: j500 psi surface pressure test
• Integrity Test - 6-'/a" hole: FIT 20' - 50' from 7"-shoe
• Kick Tolerance: Calculated an I snit T with a 8.9 ppg mud with 11.0 ppg FIT
• Planned completion fluid: Estimated 9.0 g Brine / 6.8 ppg Diesel
Disposal
• No annular disposal in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for disposal.
Haul all Class I wastes to Pad 3 for disposal.
V-04 Permit application Page 5
•
r~
Drilling Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
Well Control /Reservoir Pressures:
The Schrader Bluff sands are expected to be pressured at 8.1-8.7 ppg EMW. The Kuparuk is expected to be
pressured at 10.2 ppg EMW. The Ivishak is expected to be pressured at 8.5 ppg EMW.
Hydrates and Shallow gas:
Gas Hydrates are expected at V-pad near the base of the permafrost. Setting casing through the SV1 should
keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for
drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1.
III. Lost Circulation /Breathing:
Lost circulation is considered moderate at the faults in the intermediate and production hole sections. The
Shublik phenomenon could occur on this well, however all lessons learned have been applied within the plan to
mitigate this potential. Follow the RP guidelines for dealing with it if it occurs.
IV. Kick Tolerance /Integrity Testing:
Intermediate Section Kick Tolerance and Integrity Testing
• Integrity Test - 8-3/4" hole: LOT 20' - 50' from 9 5/8" shoe
• Kick Tolerance: 25.3 bbl KT with a 10.7 ppg mud and a 12.2 ppg LOT ~
Production Section Kick Tolerance and Integrity Testing
• Integrity Test - 6-%8" hole: FIT 20' - 50' from 7" shoe
• Kick Tolerance: Calculated an Infinite KT with a 8.9 ppg mud with 11.0 ppg FIT
V. Stuck Pipe
There could be slight differential sticking across the open hole while running the 7" casing. Keep the casing
moving as much as possible and follow the centralizer program to help with standoff.
VI. Hydrogen Sulfide
V Pad is nQt.designated as an H2S site, however Standard Operating Procedures for H2S precautions should
be followed at all times. H2S levels across the pad are typically in the 10 ppm range based on the latest
samples taken.
VII. Faults
There is a moderate risk of losses incurred when crossing faults #2 and #3.
Formation Where Encounter Fault MD
Intersect TVDSS
Intersect Est.
Throw Throw
Direction
Uncertaint
Fault #1 -Above UG1 V Pad Fault 4450 -3550 80' Southwest +/- 100' MD
Fault #2 - TJC 11240 -8365 220' South +/- 100' MD
Fault #3 -Ivishak Horizontal section 13500 -8858 30' East +/- 150' MD
CONSULT THE V PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
V-04 Drill and Complete Procedure Summary
V-04 Permit application Page 6
• •
V-04 Drill and Complete Procedure Summary
Pre-Riq Work:
1. Seta 20" conductor and weld a landing ring for the USH Gen 5 well head.
2. If necessary, level the pad and prepare location for rig move. Move well houses as necessary.
Riq Operations:
1. MIRU Nabors 9ES. NU diverter spool & riser and function test. PU 4" DP as required and stand back in derrick. ~
2. MU 12 ~/a" drilling assembly with MWD/GR and directionally drill surface hole to TD at 3126' md. The TD will be
below the top of the SV1 sand. There is a planned trip below the BPRF to reduce the motor bend and change
bits.
3. Run and cement the 9 5/8", 40#, L-80, BTC surface casing back to surface. Have a TAM collar on location if /-
hole conditions warrant. ~ p (,e.tG~
4. ND diverter and riser. NU casing head and test. NU BOPE and test t si. PU 4" DP as needed.
5. MU 8-3/a" drilling BHA with MWD / GR /RES / PWD and RIH to float co est the 9 5/8" casing to 3,500 psi for
30 minutes.
6. Drill out shoe track. Circulate and condition mud. Displace well to new 8.8 ppg LSND drilling fluid. Drill 20' of
new formation below rat-hole and perform a LOT.
7. Drill to +/-200' and above the HRZ, ensure mud is in condition to 10.7 ppg and perform short trip as needed.
During this time hold the pre-reservoir meeting highlighting kick tolerance and detection.
8. Directionally drill ahead to +/-200' and above the Miluveach and weight up to 11.2 ppg and continue drilling to TD
maintaining sail angle & direction to the Top SAG at 11541' md. POOH. Stand back 4" DP.
9. MU and run 7" 26# L-80 BTC-m x TC-II long string casing to TD. Cement in two stages to 500' MD above the j
Ma. The ES cementer will be placed at 6,421' md. Freeze protect the 7" x 9 5/8" annulus w/diesel to 2,000'
TVD.
10. PU 6-%" clean-out BHA and RIH to the ES cementer, drill up and continue RIH to the float collar picking up 4" /
DP on the way. Test the 7" casing to 3,500 psi for 30 minutes.
11. Drill out shoe track. Circulate and condition mud. Dis a well to new 8.9 ppg Flo-Pro SF fluid. Drill 20' of j
new formation below rat hole and perform an FIT to 1. ppg EMW. POOH and lay down BHA.
12. PU 6-%1' drilling BHA with MWD / GR /RES / PWD a d RIH to bottom. Drill the 10 deg/100' DLS build section,
and continue geo-steering through Zone 4B to TD at 14282' md. Perform wiper trip if needed, circulate and
condition mud and POH. Lay down excess drill pipe.
13. MU and run 4-'/z" 12.6# 13-Chrome VamTop solid liner to TD and cement (ensure 150' overlap). Bump plug ~
with pert pill. PU off liner hanger and circulate and condition mud. Displace over to 8.9 ppg brine.
14. PU 2.875" C and 2.5" 4 spf PJ Omega tapered perforation assembly and pert 1500' of liner in overbalance.
POH, LD per uns.
15. MU and r n the 4-'/z" 12.6#, 13-Chrome, VamTop completion. Land tubing hanger and test hanger pack-off to /
5,000 psi.
16. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus
to 3,500 psi. Shear DCK valve.
17. Reverse in brine with corrosion inhibitor to protect the annulus. Reverse in diesel freeze protect to 2000' md,
allow to u-tube.
18. Install TWC and test from below to 1,000 psi. ND the BOPE. NU and test the tree to 5,000 psi.
19. Pull TWC then install BPV. Secure the well and rig down /move off Nabors 9ES.
Post-Ria Work:
1. MIRU slickline. Pull the ball and rod /RHC plug.
2. Replace well houses as necessary.
V-04 Permit application Page 7
~~_
41/16" CM!
WELLHa=AD = FMC
ACTUATOR = LEO
KB. ELEV = 28.5
BF. ELEV = xxx
KOP = 500'
Max Angle = 98.27°/14282'
Datum MD = xxxx'
Datum TVD = xxxx'
Prop~d Completion V-04 / sa Tes:
1000, f--~9-5/8" TAM Pbrt Collar - IF RUN
2000' 4-1/2" HES X Nippple , I~ 3.813"
I 19-5/8" CSG, 40#, L-80, Ilk 8.835" I
I 3126' -
Minimum ID = 3.813" X Nipples
7" ES Cementer, ID= xxx" I-~ 6421'
4-1/2" 13-Cr, 12.6 Ib/ft, VTHC, ID= 3.958" I 11391'
4.5" WLEG, ID= 3.958" 11391'
7" CSG, 26#, L-80, 0.0383 bpf, ID=6.276" ~~ 11641'
PERFORATION SUMMARY
REF LOG:
A NGLE AT TOP PERF: xx°
Note: Refer to Production DB for historical perf data
SQE SPF INTERVAL Opn/Sqz DATE
2.5" 4 Opn
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
7
6
5
4
3
2
1
11311' H4-1/2" X Nipple (3.813" ID)
11331' Baker S-3 Packer, 7" x 4.5"
11351' 4-1l2" X Nipple (3.813" ID)
11371' 4-1 /2" X Nipple (3.813" ID)
' S" x 7" Liner top Packer w!
' 11391
Tieback Sleeve
PBTD I~ 14242'
4-1/2", 13-Cr, 12.8#, VTHC 14282'
DATE REV BY COMMENTS DATE REV BY COMMENTS
8/29/06 BJP Proposed Completion Rev.1
PRUDHOE BAY UNf>-
WELL: V-04
PERMfT No: xxxxx
API No: 50-029-xxxxx
BP 6tploration (Alaska)
--- --
- --------- I
E s,172
I I
I I
I I
I I
I I
I I
I I
^ V-120 ^ V-115 I
I ^ V-03 ^ V-213i
I ^ V-110 ^ V-100 I
^ V-111
I
V
1H31
^
V-117 I
f -
^ I
I ^ V-212 ^ SLOT S-R
I f V-106 I
I V-04~ I
I V-1051 ^ V-01 I
I ^ V-221 i I
II
I
IM
i "'
Iz
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
// p ~ pp0
^ V-102 ^ V-SPARE (s~or ~~) I
^ v-201 I I
^ V-107 ^ SLOT S-J
^ V-02 m l
^ V-104i ^ V-204 ~
^ V-210i
^ ^ V-114 °'
^ V-119 zl
u ~, J
L-PAD -
34
oI i
~' ~ t ?
.. ~~i ` ~
~, 7 ,
~~ ~
~
03 ~ U \~
~ ~ J .,~~
. ~ D
~~ 1~ ~.
,l a ~ 1 ~
s
~
-
~ e... ..
4 ;
%
WEST
~ K~Aq~UK :~t ,
.
~ _
~~
/~ ~
'~`~5 ~
^ ~
u
c1 'o~o
~~ 1 ~-~ _ l 2'
~ ti s 1"
~,~
_1 ~~, ~ ~~.y,
~'-` 1~.
AREA '
,~ `•T:
.: ~ s -~
~ S~ ~ ~ ~ ~.
w ~" ~`
a,1A _ .
a V-P
'h
,v, .~~a~ .
`" 3~~1
f,
wo ` ~
r~
VICINITY MAP
N.T.S.
V-202
^ V-2141 ^ V-109 i 75.00,00„ GRID. D
^ V-101 '[`"°~~~_~
^ V-211i ^ V-113 I PLANT ~-
^ V-203 ^ V-112 ~
I
0 0 I
V-PAD ~-
TO SPINE ROAD ~" _
NOTES
1. DATE OF SURVEY: SEPTEMBER 12, 2006.
LEGEND 2. REFERENCE FIELD BOOK: W006-13 (PGS. 63-64).
3. ALASKA STATE PLANE COORDINATES ARE ZONE 4,
-~- AS-STAKED CONDUCTOR NAD 27. GEODETIC POSITIONS ARE NAD-27.
4. BASIS OF HORIZONTAL CONTROL IS V-PAD
^ EXISTING CONDUCTOR OPERATOR MONUMENTATION.
5. BASIS OF ELEVATION IS V-PAD MONUMENTS MID AND WEST.
ELEVATIONS ARE BP MEAN SEA LEVEL DATUM.
6. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334.
LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E.> UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION
NO. COORDINATES COORDINATES POSITION DMS POSITION D.DD ELEVATION OFFSETS
V-04 Y= 5,970,111.23 N=10,180.00 70'19'41.079" 70.3280775'
52
9r 4,863' FSL
'
X= 590,622.52 E= 4,880.00 149'1554.144" 149.2650400' ' 1,678
FEL
P. KObBPt ~'~""BARNHART
(~ cHEC~nE by
DATE:
09/13/06
~~ DRAWING: SHEET:
FRees wov 03-me GREATER PRUDHOE BAY V-PAD
~ y~ aU aU~~o doe ND. AS-STAKED CONDUCTOR
9 09 13 ISSUm FOR INFORMATION TFe JAIF dar~ms ~xo v+o sm~rars SCALE: 1 aF 1
1'=1se' WELL V-04
N0. DATE REVISION BY CHK won~z, awa~~ eoeu
• ~
Variance Request
Issue
Compliance with AOGCC testing requirements for BOP rams after they have been used in the
normal coarse of operations.
Re uest
The AOGCC is in the process of developing a guideline document clarifing the intent ofi the
regulations pertaining to function pressure testing ram type BOP's.
BPXA requests a variance to the provisions of 20 AAC 25.035 (e)(10)C regarding the function
pressure test requirement after the use ofi BOP ram type equipment for other than well control
or equivalent purposes, except when the routine use of BOP ram type equipment may have
compromised their effectiveness. (Example would be when pipe rams are inadvertently closed
on a tool joint during routine operations.) The activities associated with this request will not
compromise the integrity of the BOP equipment.
Background
AOGCC regulations require rams that have been used in the course of primary drilling &
completion, workover and through tubing drilling operations be fiunction pressure tested before
the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure
that ram type equipment has integrity after it has been utilized in a wellbore..:for example; to
ensure integrity if a ram was closed on a tool joint. The exact regulation language is:
"if BOP sealing ram type equipment has been used, it must be tunc#ion pressure-tested, before
the next wellbore entry, to the required working pressure specifiied in the approved Permit to
Drill, using anon-compressible fluid, except that an annular type preventer need not be tested
to more than 50 percent of its rated working pressure;"
The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036 (d)(4) THROUGH TUBING DRILLING AND COMPLETION;
20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e)(i) WORKSTRING
SERVICE OPERATIONS
This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the
regulation is intended to apply to ramype eauipment only. The AOGCC understands that rarn
type BOP's are utilized for purposes other than well control in the normal coarse of operations.
The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036(f) THROUGH TUBING DRILLING AND COMPLETION; 20
AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(g) WORKSTRING SERVICE
OPERATIONS...which says generally:
20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion,
approve a variance
(1) from the BOPE requirements in (e) of this section if the variance provides at least an
equally effective means of well control;
by
Schlumberger
V-04 (P6b) Proposal
Report Date: August 30, 2006 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Secton Azimuth: 318.393°
Field: Prudhoe Bay Unit - WOA /~ Vertical Section Origin:
y
u N 0.000 ft, E 0.000 h
Structure I Slot: V-Pad / Plan V Sl ot (N-O) f ~ ~ s M TVD Reference Datum: Rotary Table
Well: Plan V-04 (N-O) ~
~ ~~ TVD Reference Elevation: 82.50 ft relative to MS L
Borehole: Plan V-04 Fe~ Sea Bed 1 Ground Level Elevation: 54.00 ft relative to MS L
UWVAPI#: 50029 Magnetic Declination: 23.895°
Survey Name 1 Date: V-04 (P6b) /August 30, 2006 Total Field Strength: 57627.735 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 206.642° 19882.24 ft / 6.511 / 1.10C Magnetic Dip: 80.881 °
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: November 05, 2006
Location LatlLong: N 70.32807729, W 149.26503901 Magnetc Declination Model: BGGM 2006
Location Grid NIE YIX: N 5970111.190 ftUS, E 590622.640 ftUS North Reference: True North
Grid Convergence Angle: +0.69206976° Total Corr Mag North •> True North: +23.895°
Grid Scale Factor: 0.99990933 Local Coordinates Referenced To: Well Head
Comments Measured Inclination Azimuth SulrSea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Tool Face
ft de de ft ft ft ft ft de de N00 ft de 1100 ft de 1100 ft ftUS ftUS
RTE 0.00 0.00 311.63 -82.50 0.00 0.00 0.00 0.00 --- 0.00 0.00 0.00 5970111.19 590622.64 N 70.32807729 W 149.26503901
G 1 327.50 0.00 311.63 245.00 327.50 0.00 0.00 0.00 --- 0.00 0.00 0.00 5970111.19 590622.64 N 70.32807729 W 149.26503901
KOP Bld 1.5/100 500.00 0.00 311.63 417.50 500.00 0.00 0.00 0.00 HS 0.00 0.00 0.00 5970111.19 590622.64 N 70.32807729 W 149.26503901
Bld 3/100 600.00 1.50 311.63 517.49 599.99 1.30 0.87 -0.98 HS 1.50 1.50. 0.00 5970112.05 590621.65 N 70.32807966 W 149.26504694
700.00 4.50 311.63 617.34 699.84 6.50 4.35 -4.89 HS 3.00 3.00 0.00 5970115.48 590617.70 N 70.32808916 W 149.26507866
800.00 7.50 311.63 716.78 799.28 16.88 11.29 -12.70 HS 3.00 3.00 0.00 5970122.32 590609.80 N 70.32810813 W 149.26514200
900.00 10.50 311.63 815.54 898.04 32.41 21.68 -24.39 HS 3.00 3.00 0.00 5970132.57 590597.99 N 70.32813652 W 149.26523681
SV6 376.03 1278 311.63 890.00 972.50 47.64 31.87 -35.86 HS 3.00 3.00 0.00 5970142.62 590586.40 N 70.32816436 W 149.26532978
1000.00 13.50 311.63 913.34 995.84 53.05 35.49 -39.93 HS 3.00 3.00 0.00 5970146.19 590582.29 N 70.32817425 W 149.26536280
1100.00 16.50 311.63 1009.92 1092.42 78.75 52.69 -59.27 HS 3.00 3.00 0.00 5970163.15 590562.74 N 70.32822122 W 149.26551965
1200.00 19.50 311.63 1105.02 1187.52 109.44 73.21 -82.37 HS 3.00 3.00 0.00 5970183.40 590539.40 N 70.32827730 W 149.265
1300.00
22.50
311.63
1198.37
1280.87
145.02
97.02
-109.15 HS
3.00
3.00
0.00
5970206.88
590512.34 7
N 70.32834233 W 149.2659
1400.00 25.50 311.63 1289.71 1372.21 185.41 124.04 -139.54 HS 3.00 3.00 0.00 5970233.52 590481.62 N 70.32841615 W 149.26617
1500.00 28.50 311.63 1378.80 1461.30 230.48 154.20 -173.47 HS 3.00 3.00 0.00 5970263.27 590447.34 N 70.32849853 W 149.26644574
EOCU 1587.83 31.14 311.63 1455.00 1537.50 273.85 183.21 -206.11 HS 3.00 3.00 0.00 5970291.88 590414.35 N 70.32857779 W 149.26671043
1600.00 31.50 311.63 1465.39 1547.89 280.13 187.41 -210.84 HS 3.00 3.00 0.00 5970296.02 590409.57 N 70.32858927 W 149.26674876
SV5 1688.80 34.16 311.63 1540.00 1622.50 327.94 219.39 -246.82 HS 3.00 3.00 0.00 5970327.57 590373.21 N 70.32867664 W 149.26704054
1700.00 34.50 311.63 1549.25 1631.75 334.21 223.59 -251.54 HS 3.00 3.00 0.00 5970331.71 590368.44 N 70.32868811 W 149.26707884
1800.00 37.50 311.63 1630.14 1712.64 392.57 262.64 -295.47 HS 3.00 3.00 0.00 5970370.21 590324.05 N 70.32879477 W 149.26743507
SV4 1850.76 39.02 311.63 1670.00 1752.50 423.79 283.52 -318.96 HS 3.00 3.00 0.00 5970390.81 590300.31 N 70.32885182 W 149.26762559
Base Perm 1896.26 40.39 311.63 1705.00 1787.50 452.65 302.83 -340.68 HS 3.00 3.00 0.00 5970409.85 590278.36 N 70.32890457 W 149.26780175
1900.00 40.50 311.63 1707.85 1790.35 455.06 304.44 -342.50 HS 3.00 3.00 0.00 5970411.44 590276.52 N 70.32890897 W 149.26781647
End Crv 1996.92 43.41 311.63 1779.92 1862.42 519.40 347.48 -390.92 --- 3.00 3.00 0.00 5970453.89 590227.59 N 70.32902655 W 149.26820916
WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-O)\Plan V-04 (N-O)\Plan V-04 \V-04 (P6b) Generated 8/30/2006 3:06 PM Page 1 of 4
Comments Measured
Depth
(ft)
Inclination
(deg)
Azimuth
(deg)
SutrSea TVD
(ft)
TVD
(ft) Vertical
Section
(ft)
NS
(ft)
EW
(ft) Gravi
ty
Tool Face
(deg)
DLS
(deg1100ft)
Build Rate
(deg1100ft)
Walk Rate
(deg1100ft)
Northing
(ftUS)
Easting
(ftUS)
Latitude
Longitude
SV3 2368.68 43. 41 311.63 2050. 00 2132.50 773.09 517.21 -581. 86 --- 0.00 0.00 0.00 5970621.29 590034.63 N 70. 32949020 W 149.26975771
'SV2 2609.57 43. 41 311.63 2225. 00 2307.50 937.47 627.18 -705. 58 --- 0.00 0.00 0.00 5970729.75 589909.60 N 70. 32979061 W 149.27076114
2988.11 43 .41 311.63 2500. 00 2582.50 1195.79 800.00 -900 .00 --- 0.00 0.00 0.00 5970900.19 589713.13 N 70 .33026267 W 149.27233800
SV1 3036.28 43. 41 311.63 2535. 00 2617.50 1228.67 821.99 -924. 74 --- 0.00 0.00 0.00 5970921.88 589688.12 N 70. 33032275 W 149.27253870
9-5/8" Csg Pt 3125.76 43. 41 311.63 2600. 00 2682.50 1289.72 862.84 -970. 70 --- 0.00 0.00 0.00 5970962.17 589641.68 N 70. 33043433 W 149.27291142
Crv 3/100 3148.11 43 .41 311.63 2616. 24 2698.74 1304.97 873.05 -982 .18 98.58R 0.00 0.00 0.00 5970972.23 589630.08 N 70 .33046220 W 149.27300453
3200.00 43 .20 313.88 2654. 00 2736.50 1340.39 897.21 -1008 .31 96.94R 3.00 -0.41 4.33 5970996.07 589603.66 N 70 .33052819 W 149.27321647
3300.00 42 .92 318.26 2727. 09 2809.59 1408.57 946.35 -1055 .65 93.75R 3.00 -0.28 4.38 5971044.63 589555.73 N 70 .33066242 W 149.27360052
3400.00 42 .81 322.67 2800. 40 2882.90 1476.52 998.78 -1098 .94 90.51 R 3.00 -0.11 4.41 5971096.53 589511.82 N 70 .33080564 W 149.27395161
UG4 3440.34 42. 81 324.45 2830. 00 2912.50 1503.81 1020.83 -1115. 22 89.21 R 3.00 0.01 4.41 5971118.38 589495.28 N 70. 33086587 W 149.27408368
UG4A 3483.97 42. 84 326.37 2862. 00 2944.50 1533.25 1045.24 -1132. 05 87.SOR 3.00 0.08 4.41 5971142.58 589478.15 N 70. 33093256 W 149.27422r
3500.00
42
.86
327.08
2873.
75
2956.25
1544.04
1054.36
-1138
.04
87.28R
3.00
0.13
4.41
5971151.63
589472.06
N 70 ~
.33095746 W 149.27426
3600.00 43 .09 331.47 2946. 93 3029.43 1610.95 1112.93 -1172 .85 84.07R 3.00 0.23 4.39 5971209.77 589436.55 N 70 .33111746 W 149.27455117
3700.00 43 .48 335.81 3019. 74 3102.24 1677.06 1174.34 -1203 .27 80.91 R 3.00 0.39 4.34 5971270.80 589405.39 N 70 .33128521 W 149.27479800
3800.00 44 .04 340.07 3091. 98 3174.48 1742.21 1238.41 -1229 .22 77.83R 3.00 0.55 4.26 5971334.55 589378.66 N 70 .33146024 W 149.27500859
3900.00 44 .75 344.24 3163. 46 3245.96 1806.20 1304.97 -1250 .64 74.85R 3.00 0.71 4.17 5971400.84 589356.45 N 70 .33164208 W 149.27518236
UG3 3930.40 44. 99 345.48 3185. 00 3267.50 1825.39 1325.67 -1256. 24 73.97R 3.00 0.81 4.10 5971421.47 589350.60 N 70. 33169862 W 149.27522781
End Crv 3956.05 45 .21 346.52 3203. 10 3285.60 1841.49 1343.30 -1260 .63 --- 3.00 0.85 4.06 5971439.04 589345.99 N 70 .33174678 W 149.27526347
Fault Crossing 4448.42 45. 21 346.52 3550. 00 3632.50 2149.64 1683.10 -1342. 06 --- 0.00 0.00 0.00 5971777.80 589260.47 N 70. 33267505 W 149.27592441
UG1 4590.36 45. 21 346.52 3650. 00 3732.50 2238.47 1781.06 -1365. 54 --- 0.00 0.00 0.00 5971875.46 589235.82 N 70. 33294264 W 149.27611495
Ma 4902.62 45. 21 .346.52 3870. 00 3952.50 2433.89 1996.56 -1417. 18 --- 0.00 0.00 0.00 5972090.30 589181.58 N 70. 33353135 W 149.27653416
Mb1 4966.49 45. 21 346.52 3915. 00 3997.50 2473.87 2040.64 -1427. 74 --- 0.00 0.00 0.00 5972134.25 589170.49 N 70. 33365177 W 149.27661991
Mb2 5058.75 45. 21 346.52 3980. 00 4062.50 2531.61 2104.31 -1443. 00 --- 0.00 0.00 0.00 5972197.72 589154.46 N 70. 33382570 W 149.27674377
Mc 5136.82 45. 21 346.52 4035. 00 4117.50 2580.46 2158.19 -1455. 91 --- 0.00 0.00 0.00 5972251.43 589140.90 N 70. 33397288 W 149.27684858
Na 5236.17 45. 21 346.52 4105. 00 4187.50 2642.64 2226.75 -1472. 34 --- 0.00 0.00 0.00 5972319.79 589123.65 N 70. 33416019 W 149.27698197
Nb 5271.66 45. 21 346.52 4130. 00 4212.50 2664.85 2251.24 -1478. 21 --- 0.00 0.00 0.00 5972344.21 589117.48 N 70. 33422709 W 149.27702961
Nc 5314.24 45. 21 346.52 4160. 00 4242.50 2691.50 2280.63 -1485. 25 -- 0.00 0.00 0.00 5972373.50 589110.09 N 70. 33430737 W 149.27708678
IOA 5463.27 45. 21 346.52 4265. 00 4347.50 2784.77 2383.48 -1509. 90 --- 0.00 0.00 0.00 5972476.04 589084.20 N 70. 33458834 W 149.27728688
'OBa 5555.53 45. 21 346.52 4330. 00 4412.50 2842.51 2447.15 -1525. 16 --- 0.00 0.00 0.00 5972539.52 589068.18 N 70. 33476228 W 149.2774
OBb
5612.31
45.
21
346.52
4370.
00
4452.50
2878.04
2486.34
-1534.
55
---
0.00
0.00
0.00
5972578.58
589058.32
N 70. 1
33486931 W 149.27748
OBc 5690.37 45. 21 346.52 4425. 00 4507.50 2926.90 2540.21 -1547. 46 --- 0.00 0.00 0.00 5972632.29 589044.76 N 70. 33501649 W 149.277591
OBd 5754.25 45. 21 346.52 4470. 00 4552.50 2966.87 2584.29 -1558. 02 --- 0.00 0.00 0.00 5972676.24 589033.66 N 70. 33513690 W 149.27767757
OBe 5846.51 45. 21 346.52 4535. 00 4617.50 3024.61 2647.96 -1573. 28 --- 0.00 0.00 0.00 5972739.71 589017.64 N 70. 33531084 W 149.27780145
OBf 5903.28 45. 21 346.52 4575. 00 4657.50 3060.14 2687.14 -1582. 67 --- 0.00 0.00 0.00 5972778.77 589007.78 N 70. 33541788 W 149.27787768
OBf Base 5960.06 45. 21 346.52 4615. 00 4697.50 3095.67 2726.33 -1592. 06 --- 0.00 0.00 0.00 5972817.84 588997.92 N 70. 33552491 W 149.27795392
CM2 6421.35 45. 21 346.52 4940. 00 5022.50 3384.37 3044.68 -1668. 35 --- 0.00 0.00 0.00 5973135.22 588917.79 N 70. 33639458 W 149.27857336
CM1 7400.72 45. 21 346.52 5630. 00 5712.50 3997.30 3720.57 -1830. 32 --- 0.00 0.00 0.00 5973809.04 588747.69 N 70. 33824096 W 149.27988866
Top HRZ 8188.47 45. 21 346.52 6185. 00 6267.50 4490.30 4264.22 -1960. 60 --- 0.00 0.00 0.00 5974351.03 588610.86 N 70. 33972607 W 149.28094680
TKLB 8458.15 45. 21 346.52 6375. 00 6457.50 4659.08 4450.34 -2005. 20 --- 0.00 0.00 0.00 5974536.57 588564.02 N 70. 34023449 W 149.28130908
K-1 8500.74 45. 21 346.52 6405. 00 6487.50 4685.73 4479.72 -2012. 24 --- 0.00 0.00 0.00 5974565.87 588556.63 N 70. 34031477 W 149.28136628
TKD 8550.41 45. 21 346.52 6440. 00 6522.50 4716.82 4514.01 -2020. 46 --- 0.00 0.00 0.00 5974600.05 588548.00 N 70. 34040842 W 149.28143302
WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-O)\Plan V-04 (N-O)iPlan V-04 iV-04 (P6bj Generated 8/30/2006 3:06 PM Page 2 of 4
Measured Vertical Gravi
Comments Inclination Azimuth Sub-Sea TVD TVD NS EW ty DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Tool Face
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (deg) (deg1100ft) (deg1100ft) (degA00ft) (ftUS) (ftUS)
TK('.a R.riRfi on dri 71 ..?dR F7 RdRF M RFa7 .5n d7.4Q n.4 aF7R Fn _7n 7R RZ -__ n nn n nn n nn ~q~aF~a c~ fiRRFia1 R~ N 7n .Rdnd7.5.4~ W 1aQ ~R1aRnRQ
8734.93 45.21
9011.71 45.21
9438.85 45.21
9500.00 44.61
9600.00 43.86
9700.00
9800.00
9900.00
10000.00
10040.91
10234.16
10387.08
10838.88
11068.26
11242.03
11394.95
11408.85
11450.55
11540.91
11547.86
11547.88
11560.91
11600.00
11605.15
11700.00
11725.62
11769.03
11800.00
11833.97
11835.97
11871.52
11882.74
11900.00
11953.76
11953.81
12000.00
12100.00
12113.44
12200.00
12300.00
43.39
43.21
43.33
43.75
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
47.89
48.40
57.85
60.40
64.72
67.81
71.20
71.20
71.20
71.98
73.19
77.00
77.00
78.00
80.40
80.75
83.08
85.95
346. 52 6570.00 6652.50 4832. 30 4641.35 -2050. 98 --- 0.00 0.00 0.00 5974727.00 588515.95 N 70.34075629 W 149.28168091
346. 52 6765.00 6847.50 5005. 51 4832.36 -2096. 75 --- 0.00 0.00 0.00 5974917.43 588467.87 N 70.34127808 W 149.28205276
346 .52 7065.94 7148.44 5272 .84 5127.15 -2167. 39 105.24E 0.00 0.00 0.00 5975211.31 588393.68 N 70.34208335 W 149.28262666
343 .16 7109.25 7191.75 5311 .47 5168.80 -2178. 67 102.86E 4.00 -0.97 -5.50 5975252.82 588381.91 N 70.34219715 W 149.28271827
337 .53 7180.92 7263.42 5376 .12 5234.46 -2202. 09 98.82E 4.00 -0.75 -5.63 5975318.18 588357.69 N 70.34237649 W 149.28290849
331 .77 7253.34 7335.84 5442 .29 5296.76 -2231. 59 94.65E 4.00 -0.47 -5.76 5975380.12 588327.45 N 70.34254667 W 149.28314802
325 .94 7326.14 7408.64 5509 .67 5355.41 -2267. 02 90.41 L 4.00 -0.18 -5.83 5975438.34 588291.31 N 70.34270687 W 149.28343570
320 .11 7398.98 7481.48 5577 .94 5410.13 -2308. 22 86.16E 4.00 0.12 -5.83 5975492.54 588249.46 N 70.34285631 W 149.28377012
314 .33 7471.50 7554.00 5646 .75 5460.63 -2354. 97 81.97E 4.00 0.41 -5.78 5975542.48 588202.11 N 70.34299426 W 149.28414966
312 .00 7500.99 7583.49 5674 .98 5480.03 -2375. 65 --- 4.00 0.62 -5.70 5975561.62 588181.20 N 70.34304723 W 149.28431
312. 00 7640.00 7722.50 5808. 39 5569.85 -2475. 41 --- 0.00 0.00 0.00 5975650.23 588080.37 N 70.34329253 W 149.28512733
312. 00 7750.00 7832.50 5913. 95 5640.93 -2554. 35 --- 0.00 0.00 0.00 5975720.34 588000.58 N 70.34348664 W 149.28576814
312. 00 8075.00 8157.50 6225. 85 5850.94 -2787. 59 --- 0.00 0.00 0.00 5975927.49 587764.85 N 70.34406013 W 149.28766153
312. 00 8240.00 8322.50 6384. 20 5957.56 -2906. 00 --- 0.00 0.00 0.00 5976032.66 587645.17 N 70.34435128 W 149.28862283
312. 00 8365.00 8447.50 6504. 16 6038.33 -2995. 71 --- 0.00 0.00 0.00 5976112.34 587554.50 N 70.34457185 W 149.28935111
312. 00 8475.00 8557.50 6609. 72 6109.41 -3074. 65 --- 0.00 0.00 0.00 5976182.45 587474.72 N 70.34476594 W 149.28999200
312. 00 8485.00 8567.50 6619. 32 6115.87 -3081. 82 --- 0.00 0.00 0.00 5976188.83 587467.46 N 70.34478358 W 149.29005027
312. 00 8515.00 8597.50 6648. 11 6135.25 -3103. 35 --- 0.00 0.00 0.00 5976207.95 587445.70 N 70.34483652 W 149.29022506
312 .00 8580.00 8662.50 6710 .49 6177.26 -3150. 00 --- 0.00 0.00 0.00 5976249.38 587398.56 N 70.34495121 W 149.29060378
312. 00 8585.00 8667.50 6715. 29 6180.49 -3153. 59 --- 0.00 0.00 0.00 5976252.57 587394.93 N 70.34496003 W 149.29063291
312. 00 8585.01 8667.51 6715. 30 6180.49 -3153. 60 --- 0.00 0.00 0.00 5976252.57 587394.92 N 70.34496005 W 149.29063297
312 .00 8594.39 8676.89 6724 .30 6186.55 -3160. 32 6.07E 0.00 0.00 0.00 5976258.55 587388.12 N 70.34497659 W 149.29068760
311 .44 8621.56 8704.06 6752 .19 6205.24 -3181. 29 5.68E 10.00 9.95 -1.42 5976276.98 587366.93 N 70.34502762 W 149.29085781
311. 38 8625.00 8707.50 6756. 00 6207.78 -3184. 17 5.63E 10.00 9.95 -1.32 5976279.48 587364.02 N 70.34503456 W 149.29088119
310 .28 8681.85 8764.35 6831 .12 6257.29 -3241. 54 4.98E 10.00 9.96 -1.15 5976328.29 587306.06 N 70.34516975 W 149.29134698
310. 02 8695.00 8777.50 6852. 88 6271.47 -3258. 34 4.84E 10.00 9.96 -1.00 5976342.26 587289.09 N 70.34520846 W 149.29148342
309. 62 8715.00 8797.50 6890. 97 6296.13 -3287. 93 4.66E 10.00 9.97 -0.93 5976366.57 587259.21 N 70.34527581 W 149.29172362
309 .35 8727.46 8809.96 6918 .97 6314.16 -3309. 81 4.55E 10.00 9.97 -0.88 5976384.33 587237.12 N 70.34532502 W 149.29190
309 .06 8739.35 8821.85 6950 .38 6334.27 -3334. 46 --- 10.00 9.97 -0.84 5976404.14 587212.23 N 70.34537993 W 149.29210
309. 06 8740.00 8822.50 6952. 25 6335.46 -3335. 93 --- 0.00 0.00 0.00 5976405.31 587210.74 N 70.34538319 W 149.2921133
309 .06 8751.46 8833.96 6985 .45 6356.67 -3362. 06 46.02E 0.00 0.00 0.00 5976426.20 587184.36 N 70.34544109 W 149.29232548
308. 22 8755.00 8837.50 6995. 94 6363.31 -3370. 37 45.75E 10.00 6.96 -7.57 5976432.74 587175.97 N 70.34545924 W 149.29239297
306 .92 8760.17 8842.67 7012 .12 6373.35 -3383. 43 45.36E 10.00 7.00 -7.48 5976442.63 587162.80 N 70.34548666 W 149.29249898
303 .00 8774.00 8856.50 7062 .63 6403.10 -3426. 00 78.06E 10.00 7.09 -7.30 5976471.85 587119.87 N 70.34556787 W 149.29284458
303. 00 8774.01 8856.51 7062. 67 6403.12 -3426. 04 78.06E 10.00 2.07 -10.04 5976471.87 587119.84 N 70.34556793 W 149.29284487
298 .38 8784.01 8866.51 7105 .62 6426.13 -3464 .81 77.06E 10.00 2.16 -10.00 5976494.41 587080.79 N 70.34563073 W 149.29315965
288 .49 8802.80 8885.30 7194 .53 6465.11 -3554 .82 75.20E 10.00 2.40 -9.88 5976532.29 586990.32 N 70.34573710 W 149.29389035
287. 18 8805.00 8887.50 7205. 95 6469.17 -3567. 44 74.99E 10.00 2.57 -9.80 5976536.20 586977.65 N 70.34574817 W 149.29399281
278 .76 8817.20 8899.70 7275 .70 6488.36 -3650. 88 73.80E 10.00 2.70 -9.73 5976554.38 586894.00 N 70.34580049 W 149.29467005
269 .13 8826.78 8909.28 7346 .65 6495.17 -3750. 06 72.88E 10.00 2.87 -9.62 5976560.00 586794.76 N 70.34581898 W 149.29547502
WeIlDesign Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-O)\Plan V-04 (N-O)\Plan V-04 \V-04 (P6b) Generated 8/30/2006 3:06 PM Page 3 of 4
Measured
Vertical
NS
EW Gravi
DLS
Build Rate
Walk Rate
NoRhing
Easting
Latitude Longitu e
Comments Inclination Azimuth Sub•Sea TVD TVD Section Tool Face
Depth ft ft ft ft de de 1100 ft de 1100 ft de 100 ft ftUS ftUS
ft de de ft
End Crv
Crv 10/100
V-04 Tgt 3
44p 12383.76
12556.45
12600.00
12648.40
12648.54 88.45
88.45
87.28
86.00
85.99 261.13
261.13
265.33
270.00
270.00 8830.87
8835.54
8837.16
8840.00
8840.01 8913.37
8918.04
8919.66
8922.50
8922.51 7396.64
7489.99
7514.84
7545.41
7545.51 6488.07
6461.44
6456.31
6454.34
6454.34 -3833.34
-4003.90
-4047.11
-4095.37
-4095.51 ---
105.64R
105.49R
174.27R
174.27R 10.00
0.00
10.00
10.00
10.00 2.98
0.00
-2.68
-2.65
-9.95 -9.56
0.00
9.64
9.66
1.00 5976551.89
5976523.21
5976517.55
5976515.00
5976515.00 586711.58
586541.36
586498.23
586450.00
586449.86 N 70.34579946 W 149.29615091
N 70.34572648 W 149.29753514
N 70.34571239 W 149.29788575
N 70.34570694 W 149.29827742
N 70.34570694 W 149.29827858
End Crv
43P
Crv 10/100 12700.00
12714.05
12832.78
12965.88
13000.00 80.87
79.47
79.47
79.47
82.55 270.52
270.67
270.67
270.67
269.19 8845.90
8848.30
8870.00
8894.33
8899.66 8928.40
8930.80
8952.50
8976.83
8982.16 7579.62
7588.91
7667.43
7755.46
7777.80 6454.57
6454.72
6456.07
6457.59
6457.55 -4146.61
-4160.45
-4277.17
-4408.03
-4441.72 174.21 R
---
---
25.47E
25.24E 10.00
10.00
0.00
0.00
10.00 -9.95
-9.95
0.00
0.00
9.04 1.01
1.03
0.00
0.00
-4.33 5976514.61
5976514.59
5976514.54
5976514.48
5976514.02 586398.76
586384.92
586268.20
586137.35
586103.66 N 70.34570749 W 149.29869334
N 70.34570786 W 149.29880566
N 70.34571139 W 149.29975300
N 70.34571534 W 149.30081504
N 70.34571516 W 149.30108850
42p
End Crv
V-04 Tgt 4
End Crv 13002.66
13082.24
13132.24
13200.00
13222.14 82.79
90.00
90.00
96.24
98.27 269.07
265.69
265.69
268.34
269.22 8900.00
8905.00
8905.00
8901.32
8898.52 8982.50
8987.50
8987.50
8983.82
8981.02 7779.52
7829.44
7859.74
7901.94
7916.17 6457.51
6453.87
6450.11
6446.59
6446.12 -4444.36
-4523.64
-4573.50
-4641.02
-4662.98 25.22E
---
22.96R
23.10R
--- 10.00
10.00
0.00
10.00
10.00 9.05
9.06
0.00
9.20
9.19 -4.30
-4.25
0.00
3.92
3.96 5976513.95
5976509.36
5976505.00
5976500.66
5976499.93 586101.02
586021.81
585972.00
585904.53
585882.58 N 70.34571505 W 149.3011
N 70.34570499 W 149.3017
N 70.34569464 W 149.302157
N 70.34568490 W 149.30270599
N 70.34568358 W 149.30288417
Fault Crossing
TD / 4-1/2" Lnr 13500.00
14282.19 98.27
98.27 269.22
269.22 8858.54
8746.00 8941.04
8828.50 8095.95
8602.02 6442.39
6431.86 -4937.92
-5711.91 ---
--- 0.00
0.00 0.00
0.00 0.00
0.00 5976492.87
5976473.00 585607.73
584834.00 N 70.34567289 W 149.30511563
N 70.34564264 W 149.31139729
•
WeIlDesign Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-O)\Plan V-04 (N-O)\Plan V-04 \V-04 (P6b) Generated 8/30/2006 3:06 PM Page 4 of 4
• •
by
Schlumherger
WELL FIELD STRUCTURE
V-04 (P6b) Prudhoe Bay Unit - WOA V-Pad
Ma9nelic Parameters Sudaca Lorali0n NA021 AlasFa Slata PMrea. Zone M. US Feet MlscelUneous
Model. SGGM 2006 Dlp BO B6t• pale. November 06. X106 La1'. N1019 ¢1016 XMng: 59!01 t1.191tt1S GriO Conv •0 fi920fi91fi' Sloi PIanV Sb11N~01 ND RaI Rotary Tabla 16]50 X above MSLI
Mag Dec: X25696' FS. 6i62]JnT Lon: Wt¢9165a ta0 Eaferg: b906216a XUS Srale Fact. 0.9999091292 Plan: VA1~P6e1 Srvy DMe: Augus130. 2006
0 1500 3000 4500 6000 7500
0
1500
3000
~ 4500
0
0
c
d
m
U
~ 6000
7500
9000
10500
0
0 1500 3000 4500 6000 7500
Vertical Section (ft) Azim = 318.393°, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-V
• •
by
Schlumberger
'JJELL FIELD STRUCTURE
V-04 (P6b) Prudhoe Bay Unit - WOA V-Pad
Magrelic Parameters Su~ace lnra~wn NAD2! ANSka Staln Planes. Zuna Od US Feei Mlswlbne~us
Mo4M BGGM 200fi Dip. PO BB',' Dale Nwem0er 05 2008 Lal 0 ~9 d1 0IB N 5)01 ~ 1911US GM Gym b fi9206916° SIOL Plan V Sb~ iN-OI TVD Ref' Ro~ury Tafib f82 50 X aeove MSL)
Ee^ 590'2284 XUS S 09999093292 Plan ny Dade A ust 30. 2008
9
-5000 -4000 -3000 -2000 -1000 0
7000
6000
5000
n
n
n
Z
4000
0
0
0
c
a~
m
~ 3000
v
v
v
2000
1000
0
7000
6000
5000
4000
3000
2000
1000
0
-5000 -4000 -3000 -2000 -1000 0
«< W Scale = 1(in):1000(ft) E »>
BP Alaska
Anticollision Report
Company: BP AmoCO Date: 8/30/2006 Time: 15:25:22 Page: 1
Field: Prudhoe Bay
Reference Site: PB V Pad Co-ordinate(NF,) Reference: Well: Plan V-04 (N-O), True North
Reference Well: Plan V-04 (N-O) Vertical (TVD) Reference: V-04 Plan N-O 82.5
ReferenceWellpath: Plan V-04 Db: Oracle ~
~, NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan 8~ PLANNED PROGRAM ',
j Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse
Depth Range: 28.50 to 14282.19 ft
~ Scan Method: Trav Cylinder North
Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing
'I Survey Program for Definitive Wellpath - - ---
Date: 4/20/2006 Validated: No Version: 2
Planned From To Survey Toolcode Tool Name
ft ft
28.50 1000.00 Planned: Plan #6 V1 GYD-GC-SS Gyrodata gyro single shots
1000.00 2400.00 Planned: Plan #6 Vi MWD MWD -Standard
1000.00 3126.00 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Multi Station
~' 3126.00 11548.00 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Multi Station
11548.00 14282.19 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Multi Station
Casing Points
MD TVD Diameter Hole Size Name
tt ft in in.
3125.76 2682.50 9.625 12.250 9 5/8"
11540.91 8662.50 7.000 8.750 7"
14197.44 8840.69 4.500 6.125 4 1 /2"
Summary
~, <--__________ ----- Offset Wellpath --- --> Reference .Offset Ctr-Ctr No-Go Allowable ~
~ $ite Well Wellpath `MD MD Distance Area Deviation Warning ~
ft ft ft ft , ft
', PB L Pad L-01 L-01 V14 7494.95 280.00 8840.30 67.40 8772.91 Pass: Major Risk ',
PB L Pad L-50 L-50 Test VO 12136.42 12080.00 562.81 192.78 370.04 Pass: Major Risk ',
PB L Pad L-50 L-50 Test2 VO 12135.57 12080.00 566.34 191.95 374.39 Pass: Major Risk ',
PB L Pad L-50 L-50 V1 12150.00 12050.00 563.91 176.39 387.51 Pass: Major Risk l
PB L Pad
L-50
L-50P61 V4
12100.00
12135.00
568.92
183.59
385.34 i
Pass: Major Risk
PB V Pad Plan V-121 (S-R) Plan V-121 V2 Plan: PI 635.89 645.00 185.89 12.02 173.86 Pass: Major Risk ,
PB V Pad Plan V-122 (S-U) Plan V-122 V1 Plan: PI 671.22 685.00 190.57 14.02 176.55 Pass: Major Risk
PB V Pad Plan V-122 (S-U) Plan V-122PB1 V2 Plan: 671.22 685.00 190.57 14.02 176.55 Pass: Major Risk ~
', PB V Pad Plan V-205 (S-P) Plan V-205 V4 Plan: PI 581.62 585.00 181.43 11.11 170.32 Pass: Major Risk i
PB V Pad Plan V-205 (S-P) Plan V-205L1 OBa V1 PI 581.62 585.00 181.43 11.00 170.43 Pass: Major Risk
', PB V Pad Plan V-205 (S-P) Plan V-205L2 OA V1 Pla 581.62 585.00 181.43 11.00 170.43 Pass: Major Risk
', PB V Pad Plan V-206 (S-S) Plan V-206 V1 Plan: PI 360.00 360.00 190.32 6.96 183.36 Pass: Major Risk
', PB V Pad V-01 V-01 V15 265.00 265.00 181.37 4.81 176.56 Pass: Major Risk
PB V Pad V-02 V-02 V12 820.85 815.00 137.36 14.09 123.27 Pass: Major Risk
PB V Pad V-03 V-03 V7 527.00 445.00 123.35 8.39 114.96 Pass: Major Risk
PB V Pad V-100 V-100 V7 513.15 515.00 211.40 8.60 202.80 Pass: Major Risk ',
~~ PB V Pad V-101 V-101 V7 1358.24 1325.00 170.03 23.36 146.67 Pass: Major Risk
j PB V Pad V-102 V-102 V5 1231.81 1220.00 37.57 20.84 16.73 Pass: Major Risk 'I
PB V Pad V-103 V-103 V6 519.59 520.00 62.05 9.10 52.95 Pass: Major Risk
PB V Pad V-104 V-104 V13 1502.36 1500.00 124.70 28.34 96.37 Pass: Major Risk
PB V Pad V-105 V-105 V13 520.08 520.00 16.21 8.91 7.29 Pass: Major Risk I,
I, PB V Pad V-106 V-106 V10 638.85 640.00 33.88 10.20 23.68 Pass: Major Risk ii
PB V Pad V-106 V-106A V9 209.61 210.00 30.99 3.96 27.04 Pass: Major Risk i,
PB V Pad V-106 V-106APB1 V6 209.61 210.00 30.99 3.96 27.04 Pass: Major Risk '~
PB V Pad V-106 V-106APB2 V2 209.61 210.00 30.99 3.96 27.04 Pass: Major Risk
i PB V Pad V-106 V-106AP63 V2 209.61 210.00 30.99 3.96 27.04 Pass: Major Risk ',
~, PB V Pad V-107 V-107 V5 877.57 875.00 110.08 14.29 95.79 Pass: Major Risk ,
PB V Pad V-108 V-108 V7 255.18 255.00 237.49 4.50 232.99 Pass: Major Risk
PB V Pad V-109 V-109 V2 916.08 925.00 251.05 14.19 236.86 Pass: Major Risk
I, PB V Pad V-109 V-109PB1 V5 916.08 925.00 251.05 14.19 236.86 Pass: Major Risk ',
PB V Pad V-109 V-109PB2 V2 916.08 925.00 251.05 14.19 236.86 Pass: Major Risk I
', PB V Pad
V-111
V-111 V25
435.67
435.00
94.59
8.20
86.40 ~
Pass: Major Risk
', PB V Pad V-111 V-111 PB1 VS 435.67 435.00 94.59 8.20 86.40 Pass: Major Risk
PB V Pad V-111 V-111 PB2 V2 435.67 435.00 94.59 8.20 86.40 Pass: Major Risk
PB V Pad V-111 V-111 P63 V6 435.67 435.00 94.59 8.20 86.40 Pass: Major Risk 'I
PB V Pad V-112 V-112 V7 320.99 320.00 310.37 5.96 304.41 Pass: Major Risk
PB V Pad V-113 V-113 V6 950.14 955.00 291.10 15.80 275.30 Pass: Major Risk
PB V Pad V-114 V-114 V5 305.69 305.00 242.84 5.28 237.57 Pass: Major Risk
PB V Pad V-114 V-114A V4 305.69 305.00 242.84 5.28 237.57 Pass: Major Risk ',
•
BP Alaska
Anticollision Report
_. -__ - -
Companv: BP Amoco Date: 8/30(2006 Tim e: 15:25: 22 Page: 2
Field: Prudhoe Bay
Keference Site: P8 V Pad Co-ordinatc(NE) Refe rence: WeA: Ptan V-04 (N-O ), True North
Reference Well: Plan V-04 (N-O) Vertical (TVD) Refere nce: V-04 Pla n N-O 82.5
! Reference Wellpath: Plan V-04 Dh: Oracle
Summary
<------------- O ffset Wellpath - ----- ~ Reference Offset Ctr-Ch' No-Go Allowable
Site Well Wellpakh 11D MD Distance Area Deviation Warning
ft ft ft ft ft
PB V Pad V-114 V-114AP61 V4 305.69 305.00 242.84 5.28 237.57 Pass: Major Risk !i
PB V Pad V-114 V-114APB2 V2 305.69 305.00 242.84 5.28 237.57 Pass: Major Risk ~,
PB V Pad V-115 V-115 V5 339.48 340.00 226.05 5.74 220.31 Pass: Major Risk
', PB V Pad V-115 V-115P61 V4 339.48 340.00 226.05 5.74 220.31 Pass: Major Risk
PB V Pad V-117 V-117 V9 338.69 340.00 195.92 6.01 189.91 Pass: Major Risk
PB V Pad V-117 V-1 i 7PB1 V6 338.69 340.00 195.92 6.01 189.91 Pass: Major Risk
'i PB V Pad V-117 V-117PB2 V6 338.69 340.00 195.92 6.01 189.91 Pass: Major Risk j
PB V Pad V-119 V-119 V13 687.20 690.00 246.56 12.00 234.57 Pass: Major Risk
PB V Pad V-120 V-120 V5 295.38 295.00 134.92 5.38 129.54 Pass: Major Risk
PB V Pad V-201 V-201 V8 1904.24 1875.00 76.99 48.80 28.19 Pass: Major Risk
PB V Pad V-202 V-202 V9 1236.98 1235.00 153.57 19.63 133.94 Pass: Major Risk ~~
', PB V Pad V-202 V-202L1 V5 1236.98 1235.00 153.57 19.58 133.99 Pass: Major Risk
j PB V Pad V-202 V-202L2 V5 1236.98 1235.00 153.57 19.58 133.99 Pass: Major Risk
PB V Pad V-203 V-203 V18 1432.05 1395.00 247.40 27.30 220.10 Pass: Major Risk
PB V Pad V-203 V-203L1 V6 6813.61 7810.00 1802.51 No Offset Errors
', PB V Pad V-203 V-203L2 V4 6898.94 8080.00 1870.67 No Offset Errors ',
PB V Pad V-203 V-203L3 V3 6856.24 8055.00 1870.85 No Offset Errors
PB V Pad V-203 V-203L4 V3 1432.05 1395.00 247.40 27.30 220.10 Pass: Major Risk
PB V Pad V-204 V-204 V2 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk ',
PB V Pad V-204 V-204L1 V2 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
PB V Pad V-204 V-204L1 PB1 V6 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
PB V Pad V-204 V-204L2 V2 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
PB V Pad V-204 V-204L2P61 V5 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
', PB V Pad V-204 V-204L3 V3 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
PB V Pad V-204 V-204PB1 V9 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk ~',
PB V Pad V-204 V-204P62 V2 808.26 815.00 190.12 14.44 175.68 Pass: Major Risk
~, PB V Pad V-210 V-210 V9 1151.56 1120.00 141.52 21.18 120.33 Pass: Major Risk
PB V Pad V-211 V-211 V5 316.54 315.00 220.82 5.54 215.29 Pass: Major Risk I
', PB V Pad
V-212
V-212 V7
467.49
465.00
45.31
8.10
37.21 I
Pass: Major Risk ~
', PB V Pad
V-213
V-213 V5
759.13
785.00
177.65
13.47
164.18 ~
Pass: Major Risk i
PB V Pad V-213 V-213PB1 V5 759.13 785.00 177.65 13.47 164.18 Pass: Major Risk
PB V Pad V-214 Plan V-214 V1 Plan: PI 1407.59 1375.00 116.33 23.16 93.16 Pass: Major Risk ',
PB V Pad V-214 V-214PB1 V2 1031.38 1006.00 128.97 22.12 106.86 Pass: Major Risk
PB V Pad V-214 V-214PB2 V3 1405.99 1370.00 116.76 2322 93.54 Pass: Major Risk ~
PB V Pad V-214 V-214P63 V5 1405.99 1370.00 116.76 23.22 93.54 Pass: Major Risk
PB V Pad V-214 V-214P64 V2 1405.99 1370.00 116.76 23.22 93.54 Pass: Major Risk
PB V Pad V-216 V-216 V8 255.87 255.00 77.08 4.76 72.31 Pass: Major Risk
PB V Pad V-221 V-221 V6 671.13 670.00 25.63 1421 11.42 Pass: Major Risk
• •
FieldPrudhoe Bay
Site PB V Pad
Well:Plan V-04 (N-O)
WellpathElan V-04
157
150
100
50
0 2
50
100
150
157
n
0
Travelling Cylinder Azimuth (TFO+AZI) (deg( vs Centre
Target: V-04 Poly
Site: PB V Pad Well: Plan V-04 (N-O)
Drilling Target Conf.: 95°/u Based on: Planned Program
Description: Vertical Depth: 8580.00 ft below Mean Sea Level
Map. Northing: 5976250.00 ft Local +N/-S: 6177.24 ft
Map Easting : 587450.00 ft Local +E/-W: -3098.54 ft
Latitude: 70°20'41.825N Longitude: 149° 17'24.670W
Polygon X ft Y ft Map E ft Map N ft
1 -112.78 -228.68 587340.00 5976020.00
2 -429.77 25.19 587020.00 5976270.00
3 -1489.42 68.00 585960.00 5976300.00
4 -2769.57 73.46 584680.00 5976290.00
5 -2795.34 423.83 584650.00 5976640.00
6 -1114.34 483.54 586330.00 5976720.00
7 -195.05 412.42 587250.00 5976660.00
8 209.88 -12.54 587660.00 5976240.00
,,_ _ __ X500
_ _ _ X000
_ 0500
-- --
_ , 0000
__ _ __ __ 5500
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
~ 0~ o ~o o ~o o ~o o ~o o ~
0 0 ~ ~o ~o ~o ~- ~- co co c~ c~ -
•
• •
Terri. Hubble ss-si,z52 301
BP Exploration AK Inc. °Mastercard Check."
PO Box 196'61:2 IVfB 7-5 -
Anchorage, AK 99519 - ~,~,
DATE
PAY TO THE r 1'
- W
First ation l' arik Alaska
Anchorage, A}K~(.99/501
MEMO_ II' l J-1-
~: i 2 5 200060:99 X46 2 2 7 5 56~~' 0 30 1
• •
TRANSMITTAL LETTER CIIECI~LIST
WELL NAME ~ ~ ~
PTD# 2q5- ,~~
_~~Development Service Exploratory Stratigra hic Test
P
Non-Conventional Well
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-Oiv`S
WHAT j (OPTIONS)
APPLIES I
TEXT FOR APPROVAL LETTER
MULTI LATERAL
(If last two digits in
API number are
between 60-69)
The permit is for a new wellbore segment of existing
well
Permit No. . API No. 50- - _
Production should continue to be reported as a function of the
original API number stated above.
PILOT HOLE j Irt accordance with 20 AAC 25.005(f), all records, data and logs ~
j ~ acquired for the pilot hole must be clearly differentiated in both ~
j well name ( PH) and API number ~
j (SO- -) from records, data and logs ~
i I acquired for well
j SPACING j The permit is approved subject to full compliance with 20 AAC~
;EXCEPTION 125.05. Approval to perforate and produce /inject is contingent
I upon issuance of a conservation order approving a spacing
i I I exception. assumes the
j I liability of any protest to the spacing exception that may occur.
i DRY DITCH ~ Ail dry ditch sample sets submitted to the Commission must be in j
i i SAMPLE I no greater than 30' sample intervals from below the permafrost or
I ~~ from where samples are first caught and 10' sample intervals
through target zones. i
Non-Conventional Please note the following special condition of this permit: i
production or production testing of coal bed methane is not allowed
j Well ~ for (name of well) until after iCompanv Name) has designed and
implemented a water well testing program to provide baseline data
~
on water quality and quantity. ~Com~anv Name) must contact the j
Commission to obtain advance approval of such water well testing j
Rev: V25106
C^,jody~,transmittal checklist
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150.. _ _ _ Well Name: PRUDHOE BAY UN_PBU V-04 __ -Program DEV _ __ Well bore seg 1.
PTD#:2061340 C ompany B_P__E_XPLORATION_~ALASKA~_I_N_C_ _ _ ___ ____ ___ ____ Initial ClasslType DEV/ 1-0_IL_ GeoArea __ __ Unit On/off Shore On________ Annular Disposal I,
Administration ';1 Permit fee attached- Yes
2 Lease number appropriate. Yes
3 Unique well name and number Yes
'~,4 Well located in a defined pool - - Yes
5 Well located properdistanceftom-drilling unit-boundary- Yes - - -
II6 Well located proper distance from ocher wells- Yes
7 Sufficient acreage available in-drilling unit- . Yes
'~8 If deviated, swellbore plat included Yes
9 Operator only affected party.. Yes -
',10 Operator has-appropriate-b_ond in force Yes
I11 Permit can be issued without conservation order Yes
12 Permit can be issued without administrative-approval Yes -
Appr Date
13
Can permit be approved before 15-day-wait
Yes -
-
RPC 9/21/2006 X14 Well located within area and-strata authorized by_Injection Order# (put 10# in comments}-(For NA
X15 All wells-within .114-mile area of review identified (For service well only) N_A -
16 .Pre-produced infector; duration of pre production less than 3 months-(For ervice welt only} NA
17 Nonconven gas conforms to AS31 05 030(j.1.A) b 2.A-p) NA-
- - ---
~18 Conductor stung provided - Yes 20" @ 108'.. -
Engineering 19 Surface casing_protectsoll known USDWs Yes
X20 CMTyoI-adequate to circulate on condractor & surf-csg Yes Adequate excess,
X21 CMT-vgl adequate-to tie-in long string to surf csg No
i22 CMT will ccuer all known-productive horizons- - - Yes
I23 Casing designs adequate for G, T B & permafrost.. Yes -
'24 Adequate tankage_o_r reserve pit - _ - - - - - - Yes - Nabors 9ES,
'~i25 If a-re-drill., has-a 10-403 for abandonment been approved - - NA- - - - - New well..
I26 Adequate wellbore separationproposed Yes - - -
27 If-dverter required, does it meet regulations- - Yes -
~28 Drilling fluid program schematic &-equip list adegrate_ - Yes - - Max MW 11.2 ppg.
Appr Date I29 BOPEs, do they meet regulation - Yes
WGA 9/2212006 X30 BOPE-press rating appropriate; test to-(put prig in comments). Yes Test to 4000-psi. MSP 3024 si.
p
31 Choke-manifold compliesw/API-RP-53 (M_ay 84) Yes -
32 Work will occur without operation shutdown Yes
I33 Is presence of H2S gas probable _ No_ Not an H2S pad
34 Mechanical-condition of wells within AOR verified (For service well only) NA -
-- - ----
--- --
~35
Permit can be issued w/o hydrogen s_ulfitle measures- -
No_
-
Geolo
gy 36
I Data-presented on-potential overpressure zones - NA_
',37 Seismic analysis-of shallow gas zones - - - N_A_
---
Appr Date i~38 Seabed condition surveq-(ifoff-share) - NA
RPC 9/2112006 39 Contact name/phone forweekly-progress reports-[exploratory only] - - NA
•
Geologic Engineering li
Commissioner: Date: Co issione Date o ' ner Date