Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-147Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 V-122 206147 500292332800 5 12/31/2023 • • ti OF To 0.,* I//jy sA THE STATE Alaska Oil and Gas Of T A S Conservation Commission 333 West Seventh Avenue JO GOVERNOR BILL WALKER _.- Anchorage, Alaska 99501-3572 Main: 907.279.1433 Off, R ...�Q, • ALAS Fax: 907.276.7542 www.aogcc.alaska.gov David Wages Well Interventions Engineer uEr 22.015, BP Exploration(Alaska), Inc. sat* (p.. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-122. • - Sundry Number: 315-510 Dear Mr. Wages: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P Foerster Chair DATED this 2 day of October, 2015 Encl. STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COM ON APPLICATION FOR SUNDRY APPRO LS 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations o Fracture Stimulate lI • Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate m. Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 206-147 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development p• 99519-6612Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23328-00-00• 7. If perforating: 471 8. Well Name and Num4er' _, , ' What Regulation or Conservation Ordergoverns well spacing in this pool? r'4 '" 9 P 9 P Yes 0 No El PBUV-122 x 'a-'" {k""'` Will planned perforations require a spacing exception? 9. Property De15 signation(Lease Number): 10. Field/Pools: AH('-'x 0 Z(k ADL 028240&047450 • PRUDHOE BAY,BOREALIS OIL' per/ s "` tl 15 c.c.- 11. PRESENT WELL CONDITION SUMMARY v,, ?,.,a Li Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 14437 • 6724 ' 14350 6721 None None Casing Length Size MD ND Burst Collapse Structural Conductor 148' 20"91.5#H-40 28'-176' 28'-176' 1490 470 Surface 3614' 9-5/8"40#L-80 28'-3642' 28'-2849' 5750 3090 Intermediate 10286' 7"26#L-80 25'-10311' 25'-6676' 7240 5410 Production Liner 4299 4-1/2"12.6#L-80 10136-14435 6572-6724 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10710'-14335' 6716'-6721' 4-1/2",12.6#x 3-1/2",9.3# 13Cr80 10153' Packers and SSSV Type: 5"Baker ZXP Top Packer Packers and SSSV MD(ft)and TVD(ft): 10085/6540 No SSSV instaiied No SSSV Installed 12.Attachments: Description Summary of Proposal II 13.Well Class after proposed work: BOP Sketch 0 Detailed Operations Program ❑ Exploratory 0 Stratigraphic 0 Development El • Service 0 14.Estimated Date for Commencing Operations: September 15,2015 • 15. Well Status after proposed work: Oil El• Gas 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: WINJ 0 GINJ ❑ WAG 0 Abandoned ❑ Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Wages,David Email David.Wages@bp.com Printed Name Wages,David Title Well Interventions Engineer kr- —vi Signature „pc....._ Phone 907 564 5669 Date r720/i5 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 315- Gib Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 q � Other: ft I.a/ , 61 rev)tt;f ett 'i-c rraLFc S Ci,e,64,“:4, D�JLiosLit? ke3d$'"j ' t.,,,,,L),, • .0 6c,,7.,.fi--ks p(J S c f'1-s-r/r2./..(.'V i r e/ems) ti- ..2,0 let c- .2C-2.3 S. Spacing Exception Required? Yes 0 No LV Subsequent Form Required: j O —4-V 4- APPROVED BYTHE Approved by: P 9�w _ COMMISSIONER COMMISSION Date: /'3_ /s i/ri. /Z-4/15- , �� 4/29124 is �r� ORIGiNAL015 , ,•z.4,,r�' RBDMS,C.. OCT 0 5 Z Submit Form and Attachments in Duplicate Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. i i STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AFFIDAVIT OF NOTICE OF OPERATIONS i Before me, the undersigned authority, on this day personally appeared ye U C' L a qY5 , who being duly sworn states: �J 1. My name is David Wages. I am 18 years of age or older and I have personal knowledge of the facts stated in this affidavit. 2. I am employed as an Engineer by BP Exploration(Alaska) Inc. ("BPXA") and I am familiar with the Application for Sundry Approvals to stimulate the V-122 Well (the "Well") by hydraulic fracturing as defined in 20 AAC 25.283(m). 3. Pursuant to 20 AAC 25.283(1), BPXA prepared a Notice of Operations regarding the Well, a true copy of which is attached to this Affidavit as Attachment 1 ("Notice of Operations"). 4. On July 7, 2015,the Notice of Operations was sent to all owners, landowners, surface owners and operators within a one-half mile radius of the current or proposed wellbore trajectory of the Well. The Notice of Operations included: a. A statement that upon request a complete copy of the Application for Sundry Approvals is available from BPXA; b. BPXA's contact information. Signed this 14th day of August, 2015. ?\r- (Signature) STATE OF ALASKA THIRD JUDICIAL DISTRICT Subscribed and sworn to or affirmed before me at Nk1m\\t .p \\ on the \6t- day of \ \\1\ s--.\ , \, C Signature of Officer \ Title of Offist • 4� S Wel[work Procedure Request To: Well Services Operations Team Lead Date: 7/1/2015 Wireline Operations Team Lead VER1 AFE: APBFRACS From: David Wages -Well Intervention Engineer Michael Hibbert -Well Intervention Engineer IOR: 200 Est. Cost: 1,000K Subject: V-122 - Pre and Post Frac Procedure Please perform the following steps 1. S D&T, Set X-plug, CMIT, Pull X-plug 1. F Assist SL w/CMIT 2. E Perforate 3. C Install IBP, Sandback 4. 0 Pop and test 6. S Set X-plug, Set DGLVs 2-6, Set Circ Valve Sta#1, Circ NaCI, Set DGLV Sta #1, MIT-T, MIT-IA, Pull X-plug, RIH w/ Mem gauge, inj test, POH w/gauge 6. F Circ Packer fluid, MIT-T, MIT-IA, Injectivity Test 7. F Fracture Treatment 8. S D&T, Install GLVs 9. C FCO, pull IBP 9. T Assist FCO and test Current Status: Operable Minimum ID: 2.813" at @ 9987', 10,110', & 10,131' MD. 3-1/2" X-Nipple 2.813 XD Duro Sliding Sleeve @ 10,028' Max Deviation: 75 deg at 10,420' MD (IBP Set Depth) Top Perf Deviation: 55 deg at 10,319' MD Last TD Tag: 8/17/2011: 13,938' E-line tractor 7/29/2011: 10,400' SL drift to Dev Last Downhole Op: 4/2/2013: GLV work SBHP/SBHT: 9/5/2014: 2745 psi and 150F at 6600' datum. Est. Res pressure: 2900 psi Latest H2S: 40 ppm, 2/25/2015 Program Contacts Contact Phone -Work Phone -Mobile/Home Interventions Engineer David Wages 907-564-5669 713-380-9836 Interventions Engineer Michael Hibbert 907-564-4351 907-903-5990 Page I 1 of 10 • 111) V-122 is a horizontal, Kuparuk producer completed in 2007 with a cemented and perforated completion. Currently, there are C2 perfs near the heel of the well and C4 perforations at the toe. There are C4 and C2 sands present in the V-122 heel that have not yet been perforated; this frac program intends to perforate and hydraulically fracture 30' of the C4 and C2 sands in the heel. V-122 is well supported by injector V-121 i; the interaction between the two wells is seen during MI slugs in V-121 i. V-122 has permanent downhole pressure and temperature gauges. Cumulative well production: 2.36 MMbbls of 0i113.41 MMbbls of Water/5.26 BSCF of Gas %`4i; 1, D&T, Set Evo, CMIT, Pull Evo 1. D&T to deviation 2. Drift with 3.7" OD x 20' long whipstock BHA for subsidence surveillance 3. Load tubing and IA with dead crude 4. Set X-plug in nipple at 10,131' 5. CMIT TxIA to 4000 psi 6. Pull X-plug Eullbore Assist SL w/CMIT Total volume for IA& Tbg from SO in Sta #1 is 344 bbls x 1.2 = 413 bbls crude needed E-1 me Perforate 7. Perforate from 10,325'-10,355' MD • See Appendix C for correlation log • 2" Powerflow HMX big hole charges • 6 spf, random orientation, 60 deg phasing • See SOR for more info 7 « f Install IBP, Sandback 8. Set IBP @ 10,420' 9. Sandback to 10,400' • Use -270 pounds of 20/40 Carbolite • 180 pounds of carbolite gives 20' inside 4-1/2"tubing Pop and test 10. Ops to pop and test to confirm GFR and WC from frac target zone. Set EvoTrieve, Set DGLVs 2-6, Set Circ Valve Sta #1, Circ NaCI, Set DGLV Sta #1, MIT-T, MIT-IA, Pull Evo, RIH w/ Mem gauge, in test, POH w/ gauge �f9 9 J 9 9 11. Set X-plug @ 10,131' 12. Set DGLVs in stations 2-6 13. Set Circ valve in Station 1 14. Circulate 9.8 ppg NaCI • Total volume for IA &Tbg to Sta#1 is 344 bbls 15. Set DGLV in station 1 16. MIT-T to 4500 psi 17. MIT-IA to 4000 psi 18. Pull X-plug Page I 2 of 10 • • If able to use HES Permanent DH gauge, skip steps 19-21. 19. RIH with memory gauge to deviation • Set to take readings every 1 second • Attempt to get below perfs at 10,349' • Top of sand plug @ 10,400' 20. Pump Injection test 21. POOH with gauge Circ Packer fluid, MIT-T, MIT-IA, Injectivity Test 22.Assist SL with circ packer fluid 23. MIT-T to 4500 psi 24. MIT-IA to 4000 psi 25. Perform Injectivity test w/ SL assist Please call David Wages prior to pumping injection test. 26. Pump the following down the TBG at max rate (8 bpm) not to exceed 4500 psi. Please attempt to keep a stable rate if possible. 1. 5 bbls neat meth (if necessary) 2. -175 bbls diesel • 8 BPM is important, please RU hardline. • Record surface pressure and rate at 1 second intervals. • Work with SLB to obtain BH gauge data at 1 second intervals. • Perform hard shut down of pumps (do not operate tree valves) and monitor pressure decline for 1 hour, then shut well in and RD. 27. Send pump rate and pressure data to David Wages Hydraulic Fracture Treatment 28. Frac treatment per pump schedule. Pressure testing Maximum Allowable Treating Pressure: 6500 psi Stagger Pump Kickouts between: 6175 psi and 5850 psi (90% to 95% of MATP) Global Kickout 6175 psi (95% of MATP) IA pop-off set pressure 3000 psi (75% of MIT-IA) Treating Line Test Pressure 7500 psi Sand Requirement 183,000# 16-20 CarboBOND V Minimum Water Requirement 1500 bbls (pump schedule: 1200 bbls) IA Hold Pressure 2500-2800 psi OA Monitor and maintain open to atmosphere D&T, Install GLVs Page 13 of 10 s ! 29. Drift and tag fill. • Previous SL runs have deviated out around 10,400' 30. Install Deep GL design :f a Post frac FCO, Pull IBP See Appendix A for FCO procedure 31. FCO and Pull IBP Post frac flowback and test 32. FCO Assist and flowback • See Appendix B for flowback procedure 33. Perform 8hr test Page I 4 of 10 • • Appendix A - CT FCO Procedure Notes: • This is a generic FCO procedure for a post frac FCO. Specific info such as amount of proppant left in tubing and estimated sand top will not be known until after the job is pumped. • The objective of this procedure is to get the well cleaned to facilitate post frac well test. • Recommend reviewing PE Manual section for Coiled Tubing Fill Cleanouts for specifics on reversing rates, speeds and CT loading. Planned Procedure 1. MIRU CT 2. MU BHA. 3. RIH down to estimated sand top and begin cleaning out with slick 1% KCL. 4. Continue down to10,219 CTMD. At this point we are 100' above the top perforation. Ensure CT is clean as it is expected that returns will begin to fall off as the nozzle nears the perforations. If returns begin to fall off, reducing BHP by lowering rate may keep returns at a manageable level. 5. Slowly continue to clean out until returns fall off to -80%. If returns are still good even after the nozzle is past the perforations (not likely but possible), continue to clean out to the IBP at 10,420' a. If SL was able to set GL design, use GL assist. 6. Continue to pull IBP. 7. FP to 2500'. 8. Pump a gel pill at surface out to the tanks to ensure CT is clean if necessary. 9. RDMO. Page 15 of 10 • S Appendix B -Test Separator Additional Flowback Procedure 1. MIRU ASRC. RU equipment to in a manner that allows CT to RU if an additional FCO is necessary. 2. POP the well to ASRC at minimum choke. Flow the initial returns to the flowline as long as the shake-outs meet the returned fluid/solids management guidelines. 3. Limit flow to 500 bpd 4. If solids are < 1%, increase the production rate to 1000 BLPD. 5. Flow bottoms up and sample for solids production. If solids are still below 1%, allow well to flow to 1500 BLPD. Flow bottoms up and sample for solids production. If solids are still below 1% continue to increase the flow rate in 500 BPD increments. The objective is to achieve maximum drawdown. Watch returns and do not continue to open choke if solids > 1%; allow well clean up before choke is opened further. 6. Once at FOC, stabilize the well for 4 hrs. Obtain a 3 hr purge, 8 hr welltest. Page 16 of 10 • • Apmpisui pendix C — Perforation Correlation Lo! T -- I��Iluxi a� ,��-- ! F! lriii111i1mNce'unimasu NO�•i,ntr amin��r.�.1•11 ! al•ulit�111111�/IYgpilal�p 110 ff11li �1 1I151i. swiss i-, din �1•11I:U111•L u1�1111N/n!M�snln a�1C-1■��n�ial•Mnirl'! ■111r;N ��111LII11111II s� �1��II11r buntihrium , ... ..no,...milif,...67,_,.............,..m. I'll' 1 3 IIIIIII!IIIIIIii! I IiiIIIIIIIIIII ARC(3R 1i...,�� - 1111111111immui 111111 � Last Reading ARC Resistivity _ _ `�...r��e�A �_ ��1•_ f7t`��j 1nVinn •� II , ii ,� in - Niumuni ! 1 �d ,( IatRun s_ 11 "1 s..._---_.i3 »fir=3LTr1421=C2 'ma,-y!snie>ts, Original Piugback(Y-122PB1)Sidetrack�. x;41f # - - li u at witsumauliMP GR # 7-ncn Casing +� u= N'ADN drifting data recorded in kickoff section 1`�L t f IJ 1 �c p fp "aias= ;! ��!♦!♦ ��- { <-� Ini1 ili.11 i First Reading NMPulse Resistivity lf���>• Mi lb• 1 • t �., 4 Hifi t ) I 3 { 1 d �< C0. • � �� � i � ! ! •:� �_•a.11�." , ii, III ;� , li ,I Iller 1 : III T !1 !ki III II; (Ir 'i 11 11 ! a 4 a Ii, 111 1 , i li r 1 1 a I ii l' 1 11 ��L ! s ! 17 1 f ryp ! 1 ! 111:1, i) 10400 IN }' t t 1 ti f1 In ( 1(lli i. f i p I( 1� i ' f, 1 1 hi , , i 1y ,_ 1 i ! Hist Reading ADN fat Pion 7)7i��1�111111.1111 EMI I'// 1:It / :/ 1!; i' ei4 ;/ � II r f..5' (I t ' lilt ; ;► it f) - 1 1111 .."�=Com,: 11',1I 11�is�1111�1•i�r� • 1 1 11 I t- ; i'+��l�il1 ( 1 f I / n r li �11�im�am� `;op @ ! { I 1 } I wurrismmai � JeP 'rig } i !� 1 I 11 II dpl1ms11♦11♦� � infice5C it 'd! ��t�w�1�____ t,t tillIt i f �� in i I II 1 I u 1 A _L, 1 `;N�ieaiaMi�� ir�il• .._,,, ' i' lIP1ii� i� j {�Jj f - : , __.-� Page 17 of 10 TREE= 4-1/18"OW • WELLHEAD= FMC S TES: WELL ANGLE>—70° ACTUATOR= L . V-122 8781'.*"ACTUAL TBG DEPTHS ARE 7'DEEPER THAN MAL KB.ELE 82.85! TALLY INDICATES***3-1/2"CHROME TBG'** BF.ELEV= 54.35'1 ' KOP= 447' Max Angle= 96°@ 10684' ' 2569' H4-112"HES X NP,D=3.813' Datum KU= 10324' Datum TVD"" 6600'SS 3203' H4-112"X 3-1/2"XO,D=2.992" 20"CONDUCTOR 175' GAS LIFT MANDRELS ST M) TVD DEV TYPE VLV LATCH FORT DATE 9-5/8"CSG,40#,L-80,BTC,D=8.835" —1 3462' A 6 3246 2613 52 MAG DU( RK 0 04/11/11 5 4563 3407 52 MMG DOME RK 16 04/11/11 4 5692 4097 53 MMG DMY RK 0 04/11/11 \ 3 / 3 6851 4801 54 MMG DOME RK 16 04/11/11 7"CSG,26#,L-80,TC-II, —{ 5177' �'— 2 8358 5500 62 MAG DONE RK 16 04/03/13 0383 bpf,D=6.276 1 9926 6438 49 I4AG SO RK 20 04/03/13 I I 9987' —{3-1/2"HES X NP,D=2.813" Minimum ID =2.813" @ 9987' . N 10008• —3-1/2"HES"SYMPHONY PLUS"GUAGE CARRER 3-1/2" HES X NIPPLE w/CABLE TO SURFACE NLA,ID=2.992" " 1002W —13-1/2"XD DURO SLD SLV,D=2.813" >< >< 10085' H 7"X 4-1/2"BKR S-3 PKR,ID=3.870" ' , 10110' H 3-1/2"HES X NP,D=2.813" 3-1/2"TBG,9.3#,13-CR VAM TOP, H 10153' .0087 bpf,13=2.992" 1 1 10131' H3-1/2" [TOP OF 5"LNR l—{ 10136' PERFORATION SUuMARY 10136' --17"X 5"BKR HRD ZXP LIP w/-MACK SLV,D=4.370 REF LOG: LWD ON ?- — / " 10153' —13-1/2"WLEG,D=2.992' ANGLE AT TOP PERF: 95'@ 10710' Note.Refer to Roduction DB for historical perf data \ / 10158 H7"X 5"BKR HMC LNR HGR,D=4.420 SIZE SIF INTERVAL Opn/Sgz SHOT SO2 2-7/8" 6 10710- 10800 0 01/02/07 2-7/8' 6 10860- 10970 0 01/02/07 10165' —{5'X 4-1/2"XO,D=3.880" 2-7/8' 6 11050-11150 0 01/02/07 2-7/8" 6 11210- 11410 0 01/02/07 2-718" 6 11470- 11730 O 01102/07 / 7"MELLOUT WINDOW(V-122)10311'-10323' 2-718' 6 11790-12020 O 01/02/07 2-7/8' 6 12080- 12350 0 01/02/07 2-7/8" 6 12650- 13000 0 01/02/07 11669' —{MARKER JOINT w/RA TAG 2-7/8' 6 13080- 13200 0 01/02107 2-7/W 6 13270-13310 0 01/02/07 MARKER JONT w/RA TAG 2-1/2' 6 13650- 13900 0 01/02/07 ,�� 2-1/2" 6 13960- 14120 O 01/02/07I 2-112" 6 14170-14335 O 01/03/07 ` 13040' -MARKS R JOINT /RA TAG II ` 14350' --I Pam 7"BKR WHPSTOCK(12/19/06) —I 10311' `� 7"CSG,26#,L-80,BTC-M,.0383 bpf,ID=6.276" —1 10676' piA.as. s 4-1/2'LNR, 12.6#,L-80,BT-M,.0152 bpf,D=3.958" 14435' �I DATE REV BY COMKENTS DATE REV BY CO1 U'tTS BOREALIS UNIT 01/06/07 N9ES ORIGINAL COMPLETION 04/22/13 JMJMD GLV GO(04/03/13) WELL: V-122 03/01/07 KSB/TLH GLV GO 04/22/13 JM) GLV PORT SEE CORRECTIONS PERMIT No-' 061470 03/05/07 MWS/PJC DRLG DRAFT CORRECTIONS AA No: 50-029-23328-00 11/07/09 RCT/SV NP ID CORRECTION SEC 11,T11 N,R11 E,569'FNL 8 1546'FE 05/02/10 CAR/PJC PERFORATION CORRECTIONS _ — 04/22/11 SET/PJC GLV GO(04/11/11) BP Exploration(Alaska) • . Force(lb1)(+Tensile) lo 90 00 4.. h = -a. - C.., ,...,.. 4=, <=> (7, . . . . - .0 C. g 0 0 C> CD C. 0 --.. •;;;;. 0 0 0 CD ND CD tr., CD 41 co 5 ,co m co <=, m. •:=. .C, Co G1,1 .4".• <> -.. •••. • . . .1.- . -• .... .,... _... .... c> KM ra. o o to o o. te:3 c., ,..,, , C -ID -•• c:,, ,,. = =, =t, =r =. =o 40. a ..- Z3 --,i •=, Ca. C - .-- -- --,-.---------- -F--'-" . CD TS 0 II.--------AN _ 1 CO -I 0 -- , -ID 0 .7. 5 Cia 0 b 07 ----2_----- 1A C <7. (...., 6-7 CD .•. ....- - C., ----__-.---__--------.---_--t --.- C,, -0 a, . r., __.. co -0 r __. 3 , . a . . .., -0 0. .. a 0 a PU co . 0 co 0 = 5 C'}Q9':2. C• CO a a. to = 0., o — -_ft _.., --=--4 =, OT, CD a -4i—Tie 0 0 40 CD — -, s. 0 0 0 CY a,. 0 __. = ‘71 cc5 0 0 0 6•1 D(ft) CD hdD 01) --4 c = r..., I §g= oo Cr. JC... N -. G, _„,a, • CI 0 c=> •:::. co „___, ,,-, ,-,. •:;:o 1: . . . . . a,., <=, , 4 I $ . ,...„. . . . , OS -1.1 a <.. ==, it .. A a t.- 4 C.TI .....0 t C=, 4:4•. CD' • C:, ....• vaik• PO . _.... 1•4 0 -. .• • 0 Ca -0 co 3 co -a cx. , a . g . 0 — la a (.7, I ,q,....44.•_... ..1 • 4 .... 3 p,..-F .=, c=, dr : ...„.....„4,......-4" • „euripe as,..j —I It . 0 ..,- • W. 0 ND • --. ,..., 0.---.••---.--,.., • - Fr. tO CD. -- CO rI IND C -C" I, • • + 7 f . o ...,.- c. . Fil' 0, a ,,,.. ...-.7- a.- c) ,,,.. ,,,,.., = 0 -VI ,=. a O. Q. 0 a.' 0 fi -...-.7".•: c> a :-., ci VIII/ .:z. = ,...... 9,-, § co _ a 0 . a cz) a o XI 3= 3= 0 =1 =1 CO e...... 47, . L, CI co ift CY, 1 E _ _ -- -, /-- C> "0 - IL. . = = = it f t .. ,.. § . . .. Page I 10 of 10 • • Date: July 2, 2015 Subject: V-122 Fracture Stimulation From: David Wages Engineer, BP Alaska o: 907.564.5669 c: 713.380.9836 To: Chris Wallace Attached is BP's proposal and supporting documents to fracture stimulate the Kuparuk interval of well V-122. V-122 is a horizontal, Kuparuk producer completed in 2007 with a cemented and perforated completion. Currently, there are C2 perfs near the heel of the well and C4 perforations at the toe. There are C4 and C2 sands present in the V-122 heel that have not yet been perforated; this frac program intends to perforate and hydraulically fracture 30' of the C4 and C2 sands in the heel. We are requesting a variance to sections 20 AAC 25.283, a, 3-4 which require identification of fresh water aquifers and a plan for basewater sampling. Please direct questions or comments to David Wages • • Affidavit of Notification (20 AAC 25.283,a, 1) Partners notified 6/11/2015: • ConocoPhillips ExxonMobil Chevron Department of Natural Resources Plat Identifying Wells(20 AAC 25.283,a,2,A-C) and Faults(20 AAC 25.283,a, 11) .. iit 3 - - - - .. .� S 5:mi;1 h. w Wells within '/z t. . w:..DT1Rt k > 100'throw mi. radius • V-106a V-121 • . © : V-115L2 50'-100`thrown C1TS I'` ° N.,- `r;.,''', 1 ...., .,.. \ <50 throw ,. ' aTsMI ,, ;-$:,,, * * .. „., :MIMI, Lateral p csrbonai 5 ;,LL urneetainty or rads s 25:; 1 I., Blue line indicate approximate length and location of frac. Per the plat above, there are no water wells within 'h mile of the subject well. f The above map shows 3 faults of concern, 1, 2, and 3. Fault number 1 is parallel to the primary fracture plane and should avoid any fracturing chemicals whereas faults 2 and 3 are far enough away so as to avoid contact with fracturing chemicals. As always, if a pressure indication is observed that indicates we've intersected one of the faults, fracturing operations will be shut down. Exemption for Freshwater Aquifers(20 AAC 25.283,a,3-4) Well V-122 is in the West Operating Area of Prudhoe Bay. Per Aquifer Exemption Order No. 1 dated July 11, 1986 where Standard Alaska Production Company requested the Alaska Oil and Gas Conservation Commission to issue an order exempting those portions of all aquifers lying directly below the Western Operating Area and K Pad Area of the Prudhoe Bay Unit for Class II Injection activities. Findings 1-4 state: • • 1. Those portions of freshwater aquifers occurring beneath the Western Operating and K pad areas of the Prudhoe Bay Unit do not currently serve as a source of drinking water. 2. Those portions of freshwater aquifers occurring beneath the Western Operating and K pad areas of the Prudhoe Bay Unit are situated at a depth and location the makes recovery of water for drinking water purposes economically impracticable. 3. Those portions of freshwater aquifers occurring beneath the Western Operating and K pad areas of the Prudhoe Bay Unit are reported to have a total dissolved solids content of 7000 mg/I or more. 4. By letter of July 1, 1986, EPA-Region 10 advises that the aquifers occurring beneath the Western Operating and K pad areas of the Prudhoe Bay Unit qualify for exemption. It is considered to be a minor exemption and a non-substantial program revision not requiring notice in the Federal Registrar. Per the above findings, "Those portions of freshwater aquifers lying directly below the Western Operating and K Pad Areas of the Prudhoe Bay Unit qualify as exempt freshwater aquifers under 20 AC 25.440." thus allowing BP exemption from 20 AAC 25.283, a, 3-4 which require identification of freshwater aquifers and establishing a plan for basewater sampling. Detailed Casing and Cement Information (20 AAC 25.283,a,5-6) Well V-122 was spudded on 12/5/2006 A 12-1/4" hole was drilled to 3649' where 9-5/8" 40#, L-80, BTC casing was run and cemented in place with 494 bbls of ArticSet lite lead and 36.7 bbls of 15.7 ppg Class G cmt with good returns to surface. After the plug was dropped, the casing was tested to 3500 psi for 30 min for a good test. A LOT to 12.0 ppg was performed after the shoe was drilled. A 8-3/4" intermediate hole was drilled to 10,685'. Once past casing set point, 7" 26# BTC-M casing was run and cemented in place with 179.6 bbls of LiteCrete cmt and 33.7 bbls of 15.8 ppg Class G. Casing was tested to 3500 psi for a passing MIT. After milling a window from 10,311'-1-,323' a 11.57 ppg EMW FIT was successfully achieved. A 6-1/8" hole was drilled to TD of 14,437'. 4-1/2" 12,6# L-80 IBT-M solid liner was run to 14,435' and cemented in place. The liner was performed in 13 intervals from 10,710' to 14,335'with 2-7/8" guns at 6 SPF. The completion assembly consisting of 3-1/2" and 4-1/2" tubing was run to 10,153' with the packer at 10,085' • . Accurate Pressure Ratings of Tubulars and Schematic (20 AAC 25.283, a,8) --- Wl'riAi7= IY wet IT 111Ir5:1Nf11 AIIC,l2. ^ru- „ „ L' V-12 2 117111....PCTU1L 1HG0EEPTHS ARE T nW'V I TIAM tit KH H.e 1°x TA OCKKK1"E,S-7-/a'COME 113a- 17F Eta 54 r tcoP= a1r 7761 4--ur mo*op o 3 0 O-..., OaaIL4. __......___1 S1 -Lr 4-112`X Caw TV-O; ,.., ♦ • OA61ST MYB-S O 70'[:r7N7UC70'1! + 17P 3'r t$ IVO;are 'frt.*r vtv 647x12.14010'' 6410 ��YR' 444 i0 Scst ---•rc,1 -i 1276• 3.4i-i----4 ' F6 7246I 2613 S2 • dM 0. ... VIII ...-._. ._.. 5 4563121.71 S2 NO`t7F7►C 88 $ O01H1 .,_1 9A21 0007 I 53 MEI( 411 AC iI1 0 01f1 V11 T COQ Mk Lao.VA• -11S-1-2f--j-----.‘ ✓ 3 0181 7 R>�1031-1 62 54 Aso[oaf #C s t• nibs' MIMEN 004117 10t 0� 1 1021111111.161 09 11[6 S7 10( I 20 000717_ 1 1 I •err 3.8rr to x t7P,o=t 77177 j Mnnlum 10=2.$13 a 9987' a N. now t.--}trr MsSYiNRM 631.18'e .Y.e1E{7► 1.3;:11.?".HE5 X NIPP LE .icastEmSURFACE 114r,.o= .ar 2 Eft - 712x7 {�err><,01,00i,oaw.o ae+r 111h11r }UT/63X1p 12-,L r I 344T•G,0is,1S-CRY as iaP- -{ Noss 0047 ePf,De 1907 f 1 1 ! 151St , 3-tx 1=tor.I) 2.6W., TOO tX S'l7A RNFf;fY4 T19t/SllAIY tf13t1' -1"x 5'0501IAD I1P11P.e*AC'7R 111.9,0=4325 FIT¢Ttl=,ti ""' N 1fIQ 7.47 Alia o.2:ter'r MIME AT TPP 9'5'05 tO7k7 1 1...F..r b Pam..,-tar'o to,....e.. ..;6' ...,��•.•• 4---71-133 Ar 5017.1! rx s poi r�+c a aR • pef x115 2 74 "6 ta7flS` tb�40 e...-T ., , ' S 1 10099 11110 O 61AZQ 7lA'iw 1.111 -15.X1.1/7 X0,0.3.110•1. 2-74• I `18350-m b 0 1LTh07 9 _ 2-7i i f 11210-11411 0 01A007 2 6 i 114763-17770 o ma / 71127 mum.-rt cx71r1r-1377117317-ttT37J 2.7; • �1179D 170J O ap7� � I /// 2.7W 6 ` 17000.12x60 0 01,02107 2-7i0' • 't.1060-57060 0 ways, 1 tN11' 'irvHif9tJ0lfr.7 M TKO i 2.7+1' 1 136x-I 00 O 018107 ' ._. 2-/,R' I .17710-17311 0 Oi R3'TC7 122I11* •1►SICHR 1C1•(r.1 R4 TAG 2.112" 0 131118-138a O 0Low 2.5er I 17w0.14120 0 01A2+07; 13.40. *vont 00/04aM MO] 2-tel 6 14170-14135 0 Mal_ 1 Icor Q 1r OM vANKTOCK(12/1106)1-1, tart :� irc�.rs+-L�-nlc-rE-msselr,o•ez'rr QKfs' ,, r ter Lot 11.e1.lam !1-111.1'•1 ,50 .0-3 1.10'x1_416" f'`� . - ATE IFv ax@Y cc7A @its a -kV br mamas I OCICAtr3 A01 MIIMI511 iota lrlorma 1,t't srrw 646101 ^airs ey v tri fnurvitl vi1, v..47> 0.110H0711cSdTIH%V CX) - 0401913 .110 C4N POR/WEE.O010it.'1K116 117141 to.'e06wu omoso?I MIK4UC3n.G CPO i CTIO103 AA b'.50429.2102040 1142710.1 RCTIV 1 'C0 MSG14MSIC 11.T7fKRt1EAVRC&1504F51f. 06102801`CARPJc H3+oK411511 1046 - _. WWI 11 SET/P7C f,1Y 00(001 t/11 1 6P 0lbrwea(Ar,tW Name/Size Weight Grade ID Burst,psi Collapse, psi 9-5/8" Surface 40# L-80 8.835" 5750 3090 7" Liner Production#1 26# L-80 6.276" 7240 5410 4-1/2" Liner Production #2 12.6# L-80 3.958" 8430 7500 4-1/2" Tubing 12.6# 13Cr80 3.958" 8430 7500 3-1/2" Tubing 9.3# 13Cr80 2.992" 10,160 10,540 • • Wellhead: FMC manufactured wellhead, rated to 5000 psi. tea► :_max t k r x 4' Iii'_ --� ,, ,.i .it i,,, 1\ :/1 if M Tree: 4-1/16" 5,000psi Tubing head adaptor: 11" 5,000psi x 4-1/16" 5,000psi Tubing Spool: 11" 5,000psi w/2-1/16" side outlets Casing Spool: 11" 5,000psi w/2-1/16" side outlets • • Tree saver: Top connection is 3" 1502 hammer union which will be crossed over to 4" 1002 in order to connect to the frac treating iron. Bottom connection is 7-1/16" The treesaver is rated to 10,000 psi. TT MIMS a t / 1 (5 m•mig . 'u P ,46I j N F { {F{ 6 i � • • Geological Frac Information (20 AAC 25.283,a,9) Formation MD MD TVDss TVDss TVD Frac Lithological Top Bot top bot Thickness Grad Desc. HRZ 9904 10222 6340 6542 202 .7 Shale Kalubik 10222 10306 6542 6590 48 .69 Shale TKUP 10306 10308 6590 6591 1 0.615 SS TKUD 10306 10308 6590 6591 1 0.615 SS TKC4 10308 10344 6591 6611 20 0.61 SS TKC2E 10344 10368 6611 6622 11 0.6 SS TKC2D 10368 10389 6622 6631 9 0.62 SS TKC2C 10389 10421 6631 6641 10 0.63 SS TKC2B 10421 10650 6641 6659 18 0.65 SS **TKC2A N/A N/A 6659 6670 11 0.66 SS **TKC1C N/A N/A 6670 6687 17 0.66 SS **TKC1B N/A N/A 6687 6704 17 0.66 SS **TKCB4 N/A N/A 6704 6735 31 0.66 SS TKC2B* 10650 10804 6639 6659 20 0.65 SS TKC2C* 10804 10975 6625 6639 14 0.63 SS TKC2D* 10975 11180 6611 6626 15 0.62 SS TKC2E* 11180 12569 6602 6611 9 0.6 SS TKC2D* 12569 12673 6632 6602 30 0.62 SS TKC2D* 12673 14437 6636 6632 4 0.62 SS TD 14437 6641 6636 *Invert Section **Estimated from V-122 PB1 (V-122 well trajectory never crossed) Mechanical Information of nearby wells(20 AAC 25.283,a, 10) Per plat above, the following wells have been reviewed for casing and cement information: V-106a Spud Date: 10/7/2004 7" 26# L-80 production casing set at 8860' in a 8-3/4" hole, cemented with 366 sx of LiteCrete 191 sx CI G. 4-1/2" 12.6# L-80 set from 8695'-13,228' in a 6-1/8" hole, cemented with 499 sx of CI G 4-1/2" 12.6# L-80 tubing set at 8710 with the packer at 8649' V-121 Spud Date: 3/16/2007 7" 26#VT-HC and BTC production casing set at 12,015' in a 9-7/8" hole, cemented with 363 bbls of LiteCrete and 54 bbls of Class G. 4-1/2" 12.6# L-80 tubing set at 11,590', packer at 11,519' Perfs from 11,696'-11,773' V-115L2 Spud Date: 6/2008 7" Production Casing set at 8153'. Cemented with 393 sx of class G ahead of 150 sx of CI G. 4-1/2" liner from 7996'-6631' cemented with 248 sx of Class G 2-3/8" slotted liner from 97252'-11,300', not cemented. • • 2 ece4�ed, j J /.o Summary Hydraulic Fracture Program (20 AAC 25.283, a, 12) (Detailed program included) 01 8 F NON1nN`M"V 28 CO OOO t2O.MD W 88 N U a H 84'44 NNN(O;r N N M M M g M M C GO O O O -. ` 0 p . 6 E 3 1- N N N Oti n N N MMNN N p n ti N p 0 Ls:..- .. 0 00.* . O = __^ O. N o m cc d• Lo N V V V V V V V V V V V V V V V V N N �, G C o �, 0 @) M.v- V a. m s, E M M N uN 1 O F R M C0 O 00 0 0 0 e V 9 I o e 7 1'12 o 0 0 0 g g 8"T e 8 E M m N 1 U C.= !VNO N P N N T O 100 OM1 0 E$ 0 ' ._. l ° B. 4 -M 6. a V6 a. M0 yyN M�ppN�Np000 E qd0000000,,�N co,Xry n ti t N N IV("1 N el O Or 4 Q V(p Vo0 0 0 Co o o e=a O 6 V Ao'i - ! `000OWO,-NM.In(ON000107-rN000 ' m_ 4 T o u+ b .n ry .- m y qp,Apsomh a. a s 211111111111 0. u U U U U U U lu U U U U U E T.- o0000000000o09909000 PetT??E E ???F.e't rj 8i 28§2§20 !88''14144 M 4-4(03 app lfA0 `4 S 6 x Z 6 4 4 4 6 L ; U 1,-,_ �N 0 1n intra in (0 rr CO COTOO OIT 6114 D.0.6 a .n 6 0. i rn v�appa.pprn rn1p1p8 poo.1prn pp&IpP ?....'1= 7= .O o0_ 222 O p0 pOp p0pO1/n101n1 p0p0QO QO QOQO p0p0000 N 880000 C•i`R N80G M f8G N7- O,5t,7'0 1`d 2 2 N N lfi 111 S3 Y=Y=In�N In tD(V v�N�O N (D�N�G� 0 d d GMS001 O p o N I2 p pl • 5• R N 010, •N•NNOO .:-•00 • • • U N m Ti b 0 r O N N N N N N 48884022V 76 -& N b='EoII1ppp 5044 _ opp00000008888880N 5 NiONMOOOOOOON N M M- g Ccpb ^ w o Vj 0 O[ fV d O V N N r r V( } }p CI N N fI O 4_G Cy7y _' 1 DN $ .8 lir ▪ bANA0I N mg o 00 co co 0 o.lc+m,.CO�N.-O.1 L •O ..Q ` 4 ,6 rn5..OjNU(� W 3• d 0 TSVMT0100 OO d O M cn UVr DNNOOIn +N1NpNDFN`NONOW rN • j�ppNONONN L. R.. N m52OO"m1( R [^ 0000.000.-d lOM en 0O,M000 i $ppONffO C VNppMMr00TTNp V} 49 ,.. CO, M E C. 8pO O OO(P M 0N NN N(O O O N O N O O 'a _ g. c0 N O(-10((O NN 0.((D N CO,CI . V.(DM O U U• " 0 0 ND 8 N N N N N N N N T T M T M 0NNVN In M vlaa 00 Q y 000 4yCv 7A OO O OOON O O N M N N NNDN ONt 8NO E8 i534 N a N.- .-M 000001: (Dh 00M MN0 O _ '2 U7• q y N N O p(V =�0 0� =NI Ni O(� �V M�.& V O- N 0 p C p c E 2 gQ E c SI 11g, i.1I - T `1113$1i` 111111 a p1010 a 4 (, a 4 aga 1- :6 1�5 Ipy� b§ {QYj c a C 0 a._ 9 m .Y cc z. c 3 2 {..iia•. iz��11..y.�I..{.1,. ^.. {^{��_1 L A j-6 2 S O; S y O R V T 0 IL 3} }7}7 Y T T} }�}}3 J U a(111- a Q Q H Y.Z Q U. E li s a 100 O - Y <A Y 6.0 d § SS ala a3aa(}ia64vlltri((7461MuMMM6-117SuM1��� 4 R G.-0 O In 03 N 0 010TZ '..-1X VI0�DPNN N Races A d1/21/2o t ,j • • V-122 Trajectory 6550 '''''''''',..„..........,........,.......\ 6600 Soiimimimmiswwimmm ►- Cif>:}0 C4 sands • C3 Sands • C2E sands • C2D sands • C2C sands Si C2B sands C2A sands ■ B sands ■ B sands ■ B sands Above is a cross-section of the wellbore with the approximate perforation location labelled with the red line. The maximum horizontal stress has been determined to be nearly parallel to the wellbore, this is based on a regional stress map. The maximum horizontal stress means that the induced hydraulic fractures will be parallel to the wellbore. Frac Dimensions: TVDss,feet MD, feet Frac Half Length, ft Top 6550 . 10,114 —300 ft Bottom 6690 Exceeds bottom MD The above values were calculated using modeling software. Maximum Anticipated Treating Pressure: 5500 psi Surface pressure is calculated based on a closure pressure of —0.6 psi/ft or —4000 psi, this plus the anticipated net pressure to be built (500 psi) and the friction munus the hydrostatic gives a surface pressure of 5500 psi at the time of flush. 4000 psi (closure)+500 psi (net)+3900 psi (friction—2900 hydrostatic= 5500 psi (Max surface press) The frac height is primarily based on closure pressure differences between the confining shale layers harder, more brittle sandstone reservoir. Average confining layer stress is anticipated to be—0.7 psi/ft. Zec&.t.v 9/29O i,s- • • Half length is based on confining layer stress as well as leak-off and formation modulus. Given the values,the above half lengths are calculated. Pressure Test Information (20 AAC 25.283, a, 7) Per the frac program, the both the tubing and the IA will be pressure tested. The IA will be tested to 4000 psi and the tubing will be tested to 4500 psi(110% of max differential of 4090 psi). PRV setting procedures and annulus monitoring: Maximum Anticipated Treating Pressure: 5500 psi Maximum Allowable Treating Pressure: 6500 psi Stagger Pump Kickouts between: 6175 psi and 5850 psi (90%to 95%of MATP) Global Kickout: 6175 psi (95%of MATP) IA pop-off set pressure: 3000 psi (75%of MIT-IA) Treating line test pressure: 7500 psi Sand Requirement 200,000#16-20 CarboBOND Minimum Water Requirement 1500 bbls(pump schedule: 1200 bbls) IA Hold Pressure 2500-2800 psi (IA pop-off @ 3000 psi) OA Monitor and maintain open to atmosphere There are three overpressure devices that protect the surface equipment and the wellbore from overpressure. Each individual frac pump has an electronic kickout that will kick the pumps into neutral as soon as the set pressure is reached. Since there are multiple pumps, these set pressures are set between 90% and 95% of the maximum allowable treating pressure. There is the primary pressure transducer in the treating line that will trigger a global kickout which will kick all the pumps into neutral. Finally, there is a manual kickout that is controlled from the frac van. All three of these shutdown systems will be individually tested prior to high pressure pumping operations. Additionally,the treating pressure, IA pressure and OA pressure will be monitored in the frac van. • • Summary Hydraulic Fracture Program (20 AAC 25.283,a, 12) (Detailed program included) V-122 Traje c t ory lett:thkelts.A.V2Alt,ItAit' P11411:144:, #Y z `xYMie+i ' 6600 a � a , Above is a cross-section of the wellbore with the approximate perforation location labelled with the red line. The maximum horizontal stress has been determined to be nearly parallel to the wellbore, this is based on a regional stress map. The maximum horizontal stress means that the induced hydraulic fractures will be parallel to the wellbore. Maximum Anticipated Treating Pressure: 5500 psi Frac Dimensions: TVDss, feet MD, feet Top 6550 10,114 Bottom 6690 Excees bottom MD The above values were calculated using modeling software. Surface pressure is calculated based on a closure pressure of —0.6 psi/ft or —4000 psi, this combined with the anticipated net pressure to be built and the friction gives a surface pressure of 6500 psi at the time of flush. The frac height is primarily b ed on closure pressure differences between the confining shale layers harder, more britt){e carbonate eservoir. Average confining layer stress is anticipated to be —0.7 psi/ft. Half length is bas cLon-confining layer stress as well as leak-off and formation modulus. Given the values, the above half lengths are calculated. Pressure Test Information (20 AAC 25.283,a,7) Per the frac program, the both the tubing and the IA will be pressure tested. The IA will be tested to 4000 psi and the tubing will be tested to 4500 psi (110% of max differential of 4090 psi). PRV setting procedures and annulus monitoring: Maximum Allowable Treating Pressure: 6500 psi • S Stagger Pump Kickouts between: 6175 psi and 5850 psi (90%to 95%of MATP) Global Kickout: 6175 psi (95% of MATP) IA pop-off set pressure: 3000 psi (75%of MIT-IA) Treating line test pressure: 7500 psi Sand Requirement 200,000#16-20 CarboBOND Minimum Water Requirement 1500 bbls (pump schedule: 1200 bbls) IA Hold Pressure 2500-2800 psi (IA pop-off @ 3000 psi) OA Monitor and maintain open to atmosphere There are three overpressure devices that protect the surface equipment and the wellbore from overpressure. Each individual frac pump has an electronic kickout that will kick the pumps into neutral as soon as the set pressure is reached. Since there are multiple pumps, these set pressures are set between 90% and 95% of the maximum allowable treating pressure. There is the primary pressure transducer in the treating line that will trigger a global kickout which will kick all the pumps into neutral. Finally, there is a manual kickout that is controlled from the frac van. All three of these shutdown systems will be individually tested prior to high pressure pumping operations. Additionally, the treating pressure, IA pressure and OA pressure will be monitored in the frac van. V-122 Rig Up IW—tm 411 IA WV . . al/wag boo IS gamy for Ltignerons Mi= .._..-- control • it - s aiii . • I Prop End 1111.111 -I 1111/ • Chemical Disclosure (20 AAC 25.283, a, 12) Fluid Description(s) y1:128Fieadl'Wp128 229,026 Gal 1 Contains:Water,Surfactant,Breaker,Stabilizing Agent.Gelling Agent Crosslinker,Scale Inhibitor,Clay Control I Agent,Additive,Bactericide,Propping Agent The totalwlsre*sted it the ailescopemansaa the summation ation a)exrer and additiveswater a supplied by diem Chem::al*ia.r= Mass Fraction - Water(Including Mix Water Supplied by(Sent)' '90% 66102-661 Ceramic materials and wares,chemicals "'9% 9000-30-0 Guar gum <0.1% 61-48-1 2-hydroxy-N,N,N-trimethylethanaminiumchbide <0.1% 7727-94-0 — _ Diammoniutn peroxidisulphate <0.1% 1319-331 Boronat ocaldte <0.1% 107-21-1 Ethylene Glycol <0.1% --- ____ --- -- --- --- 129898-01-7 2-Propenoic acid,polymer with strt$rnn P rate <0.01% 1310-73-2 Sodium hydroxide(impurity) <0.01% S0-704 Sorbitol <001% 67-63-0 Propan-2-d <0.01% 111-76-2 2-butoxyeihattol <0.01% 25038-72-6 lAnyriderse chloride/methyucrytibe copolymer <Q01% 34391101-1 Alcohol,al linear,,thr ykateJ <0.01% 68131-39-5 Cit-1S alcohol ethyorrylated <0.01% 1330-434 Sodium tetraborate <0.01% 7647-14-S Sodrumchloride a I.mmT_^ <0.001% 9012544 Neniodtdme enzyme <0.001% 1110-17-8 Pumatic add <0.001 5 —T 1004435-3 Boric add <0401% 7704-736 Monosodium hanaraie <0.401% 10043.52-4 Calcium Chloride <0.001% 91053-39.3 Diatomaceous earth,calcined <0.001% 112-42-S 1-uldecanoi _ <0.001% 7631-86-9 Nan-aystalline sihca(impurity) <0.001 14807-066 Nl4reaaan si'icate hydrate(talc) <0.001% 141377.30.3 MaBndtmr nitrate <0.0001% 111-46-6 7.2"-mydiethanol(impurity) a. <0.0001% 9002440 poly(tetralluaoethyiene) <00001% 2316 72-55-4 S-chloro-2-rnedryi-2h-is thiamld-3-mw <08001% 7786.30-3 Magnesium chloride <00001% 45-005-87-0 DYstar,gum <0..0001% 7447-40-7 _ Potassium dioxide(impmily) <00001% 2602-204 2-methyl-2b-isotiiam43ane <0.0001% 121-042 Acetic add,potassium'salt <011001% 1411I840-7 Quartz,Crystalline sica <00001% 14464464 Cr600balite <011001 5 6419-7 Aceic ••:t;ya:..y:t <0.000001% S ! Davies, Stephen F (DOA) From: Wages, David <David.Wages@bp.com> Sent: Tuesday, September 08, 2015 3:02 PM To: Davies, Stephen F (DOA) Subject: RE: V-122 10-403 supplement Attachments: AOGCC Kuparuk Isolation.xlsx Attached David Wages o. 907.564.5669 c. 713.380.9836 W I E-AK From: Davies, Stephen F (DOA) [mailto:steve.davies(aalaska.gov] Sent: Tuesday, September 08, 2015 12:40 PM To: Wages, David Subject: RE: V-122 10-403 supplement David, One more request: To the supplementary table that you provided,could you please also add the same hole size, casing, cementing,top of pay interval, and zonal isolation information for the PBU V-122 intermediate casing and production casing/liner strings(for the well to be frac'd)? Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. Sent from my desktop PC From: Wages, David [mailto:David.Wages(abp.com] Sent: Tuesday, September 08, 2015 10:00 AM To: Davies, Stephen F (DOA) Subject: V-122 10-403 supplement Steve, Attached is a supplement to the sundry application for fracturing on V-122. It contains information similar to S-42 where we verify cement coverage over the Kuparuk in neighbor wells. Thanks. i i N N O 0.0 40 CO CO C a d C C C V U u N a C C . . J 3 O -D N 0) O/ CD -- C C O) O1 O/ E O) O1 OJ V V > T T T 0 = 0 C O 0 7N N N N 0) 0) N c 0 N ID 2 a, c °1 O O N N co I1- n N T H m m )O in )0 CO CO m a 0 LO LID LD 0. 0 LIDLOWLOLOWLDLD F- u m 01 io m .-- ti Q oanmac 00 v m 0 I- 0 m to c Lo v v 0o Z 0 N Cr On 100 0000 CI W z z 0 v > > @ Q vv E E E E E E E c f6 U > > > > > > > 0 0 v u r > > > > > > > O CI- LOT1.1.4-. C8L000 m" CO U 2 0u, a N 40 N O_ O v an D! L n N-I W n ti O C W l0 t0 Ot W tD 2 L O. O 0! CCO d' ' V1 O a b° 00 a' O V N 00 0 0 U 0 n y n lf y L I, n V n n r^+1 � N U U 00 D0 b0 b0 C y C W C C a U JV U C T ry H C C C C m O p O_ O_ O vC-i u j u j U O p o p o p a � aaaa � 0! 10 - J l0 f0 N l0 0 Cs! V1 Z .y N H • • Wallace, Chris D (DOA) From: Wages, David <David.Wages@bp.com> Sent: Thursday, September 24, 2015 2:13 PM To: Wallace, Chris D (DOA) Subject: V-122 AOGCC Notification_24-9-2015.docx Attachments: V-122 AOGCC Notification_24-9-2015.docx Chris, I hope I got it all in there.There is the calculation for how we calculated surface pressure as well as the pump schedule which shows concentrations of chemicals. Please let me know if you need anything else. David • • Davies, Stephen F (DOA) From: Wages, David <David.Wages@bp.com> Sent: Tuesday, September 08, 2015 10:00 AM To: Davies, Stephen F (DOA) Subject: V-122 10-403 supplement Attachments: V-122 AOGCC Supplement Info.docx Steve, Attached is a supplement to the sundry application for fracturing on V-122. It contains information similar to S-42 where we verify cement coverage over the Kuparuk in neighbor wells. Thanks. David Wages o. 907.564.5669 c. 713.380.9836 WIE-AK 1 S ! `v `v tin m C C C m m I I C ` m v C C C ,,. m m m E in 1 0 C C 7 7 7 • 91 Y.1 10 Q • C C 7 E v w E E E o O W W V l.! lJ W • is b Yl U/ — C C U J y V D N a w C C `y a w £ E J w w c O i0 N w w N N N O Ol QI 97 rW r r r r r iv A a, .. c LLd N N an m m m T w artm o0 �,.:..:..::.. to I V ... 01 50 m ,-1 •-1 Q u u u u '7.! V E E E E E A u 7 7 7 7 7 � >° > >> > u o „ LL m 4 ..,.9 v uOn f + C S + fy Non ej $$ > O N int of ititi n r,:.Oil r. +. ai . a O C Q _ an 6 Oi tU X Z { G 4, 0 N Ul N• l O m i- OA ic4 Oei o0 € ts- W Ill d t ' ,so0 G f.... V h f+ Q rA0 r F. V � g �_ u C S C y R w An C N tel C U 0.• U J V U J C si.. C C 1 C O O O O O i 4;. . •1.1 7 7 > > 7 u g 8 a: 11111111111111 III i a a " 8 8$ ,$8 88 R R 1 ti J _5,64 -K4.,,MIXTP.5 cert f,,r:;.; .. ,i.T 000044400c0914••• GOSYW • • 0 0 111N 8 c-i N +-,. OD 4A C M c ++ O, o N a N V x r N -, D -(T� RegI _ R e c f g CU CP N I i t ,,rr f / , M O • f • 1 g ° N { 1 0 • # N !_t .1 •.— ?52 \ i \ m +) - m yf \ N N Q 1 M NC')grboaki N > > g 1 i ., 1 4 6- X N U c' . 0 . , -,. f, „,0., , g, �` , N J ® $ n { .,1gr g pg pcl ' 11 ! 1 l 1 1 1 V I R f$0}EEE° of r ! /1 F! \\ 1.l. r Si 1�` .A; I ,ro, � -. r T -v j N 8 — o g g 40..tU O a • ! c‘• in in in Ln Ln I Ln Ln Ln 1 I ,n O c-1 c-I c-i ri c-I \ 1 1 O O 1 e-1 N ' Cl 0 ( p NIC N O N O NN O N O N O N' 1 1 1 CNI Q� W \ -LL \ LL \ 11 \ LI.. \ LL \ LL \ LL \ U- .. C N N N N N N N N N N 'N N N N N v) c G FFA` \ 00 00: 00 00 00 1 00 CO- 00 a) .. - ___ . ..._......-�._ ..._........_.. __. ..._. ._ ,..... _.1._.__ ....—.___.._. . ...._.__.__._.. I. 1cu O E Ln a! ' 1 I (n O Z CO .� +�, tv 1 CO 1 ca a) a of V) C +�., - N S E 1• 1 1 (0 C = C 1 E 00 O 0 Z O 1 �•� 3 C 'O +-. v- a 0 i U0 N 3 O > O a)if, CEJ 1 1 Z (0 Q O' i V m -0 ' NO3 0 1 iI ' ��( _ c (a C 0 O _ c 1(7 in (o I Q" Q i 1 +-• %..0 O M C O 'O a) C O -?. _ 1 o. 0 0 (0 3 o < �. v Q.x 4-0 C) ! U L _, LixJ C C C .4° (gyp 0 ' a) ' i x C Co Z iH a � . 0 0 10 Ln 3 1 U 1 o o 4- Q '� Lu 3 Ln cu >- I :Z O 4- (C (6 (d i i U M 1 a• L ' ' Q 13 C a ri0. a a o (° `° ci, o- v n a a n3 (o n3 0 1 > n (0 •L 020 n � 3 3 3 C, � ro N N N: a)NC 4.- . V N a) n C •. +, O, -a -a a a) a C n r6 v •L ^ o v1) I v a) v a) > y a) 1 C L" N M 1:=3 - , v) > > > = C a-+ > O V C D c , I N }+ l ns c O 0 0 , 0 3 O X v 01 Y ' O m O O Z U i < o o 4 _o. , a a. .E Z in 1-.1 Z a Z Z .Z .... 1 � Icu L 0 C on N of '� o a a. • c ° a, a o 0 1 o 1 a L a zs I 1 C 3 'o v 1 C a • o a -a Q 11 1 t • 4 _� at Oi � `ti o- - >, vi vi Q C ,0 Z O ..i % A L , — i.., v v E +:+ 4111 v 0 ram a L`c .° ' i 3 I a` 1 Cr Q i NNO' V1a Ia a,° °; a a -aaca a .V a s 0 Q�1 O 1 Ll1 > > -a C 3 3 1_' a, a, 01 D __. Q 1 m U ° Q a. m i u. CS Q 1 v N C 1° v a o a c-s. a aa° aaa a � 0 1- ;- 11 N I 1 1 I ' I I i I ! 1 ! i 1 - "' 1 1 1 `° 1 1 1 L (6 OC 1 14 i CO a a 1 I 1 Q I 1 I 1 U (Z I € (.9 Qi...............__ i- .... .-... _ �_i- ..._' 1 _. 0 • 0 i•n • oci o"' ,� �, 4-1 N� ' o o ooQQLL vr_i QQ LL v1 LL v L0. ., "-----. i NI NI NI _0 v v v) E cn >- co p 4- o }i In .0 vi tol >, H o N -VI ai N • = c ai c u )_ ( ! o O.n N_ ,. - f6 Co vi ra u Ln co N L c-i U ^ 1 a 1 � � cn . N n, c ° 0 NI ate. a) 00 L ca cu .— co� O Zr) lO \ o u O V 111 45 L v N in .. "n z `3' o f° $ a) > L I L L co I �..� -� {n o a) a) a) a) a) toLa N a) , 0 c �, v M \ \ co O a) a) co O LO v O \ -C 4- O o. Q- " N M v N O an aJ N 43 N i aA \ l.D N h '' .i N a) i j 0 • , O C >. c -c f•- C \ ;-i O N ci,N t o O O a) a c .--i iJ C V •C N 00 "O -C �' vs m 'O W M O O N co 'O ,--11 �O m _ `, to Z N to p ? • a) N N N > cm ONi > `� Ql .Q' (_� .0 = 0 C U U �,,,.� N 00 \ 41 1 0 �,.1D• act, • .C. (13 ,.Q o f a) a) — co Y N a) I LID Co - o C C co N co i! CI)u vi 'C o N N N l6 bb > oA (U cr)01 N N n3 oA .( a) vl > a) ).- 0 i c v � � c c t v Y a c E CD L v 4-0 Q -0 +� `° .O 'E 1 E 3 •c c N 17 3 ° 'c u n- CO 3 0 •_ a1 C a) 2 v= N - Y 0 a) NJ Co = vi m H Q � NO o .a c N c c a) ca qp C N L co CI. 0. as, ozaY c o o = = aY c o > Qa a) O 0 0 o Co U L U U U •L U _ 0 CO 0 rl C 0. ! a + W V) a) v u v a, Y v O. 4-1 l'i of a 2 o O a ra 0 3 O t c p m +� a) U I .� U 'nl LL J Q LL J >i,,N N Z a +�.,; N .............. ......._._._.- -....-....-.- ...__.._..._ ...._.... ....._ .. . . -i 1 I v)LO N to O v a o ccai aC1- LL N c 1-. o . a) N C) a'U — au -C 0 0 o c c a N � � o .0 � vC c� u .0 ° a I Id c o o a, ° v v o !o t 22 v ° ° a'a E 01 I ? oo a 0 4v o u Cao 0 Cli -o c c u a) a, a, °2 L ° uCO E 0UO V)a av' C `, I O 1 p ' _ °° ° c c 0) 1M N Co o ao CU 40 ti c ' O % CLC L C L. i4... I 3 C H U Ln M v 'vQ 'o � a m ) w a =V - a La 'o -CI-1 Q d 'a a orn o -6i ' o) • Q J 1 1 -C 0. 1 , f6 L i Co1 L 1 , a 1 u i U i C7 i_.. .....__ Q • • v) 0 4-1 4) G..)) i 'i 00 306- al.EI N t V �C (,,,) 4 C N 4-a E = I c3N a v hi,..2.! vco —ac -o a 4e:),_0 N) caj . oN r' °a con ` 00 11 V �. — 3 o n } O p rn coO 1 ; co a) N in i -a ltUflDfl oN C en C v aai ,CU a 03' v u n ., ai I Q � - N a; f6 N O > co i . }r 0 v O n O Q _; •> - O > O O a) N 0 Z N t H N .�1 CU Q m O L (.° "CV CU:� + L N tanO p - to N to j u Q O �_70 Cs T a) 72 c co 1 Q _ Q N 0 .01 '� N O a i O : �O 4, Q a-, 0. f0 a) 03 f0 .`� v N •- N v aca. ai °J "6 MO a on cin ,, sn ,• , 3 ' _ 3 S- "6 .� a) f0 - Y l0 a) N > v > o 4rcs -, C `° Q v°'i y L YIt I Q N a U — a) a U + l-I 'i 'eii m O 0 7 N m 01 a) o , (0 (00 0 o m= f0 C Le" o. C.,/ 1 L> d +r Y a-I a a-,I Z v, E 4- ._ Z 4_ o Y ._ t+ L i M cu CO . oA0 i , o U O UN I oco . i y t 0 a, ' ;ua V 0 � t c O o, o - i00 I i v +" O 3 +., , o V)0 Q p � ° +, 1U v a Q3ZI o � 4-, 1-) 0 o vo vv o a o L. a I v 0 'a ct � I 0 0 Io v c O. 1 O °) a) .o 47:, O a , p a) O I wo -0 c o 'a, O E CS S c- E o a E m N a E moo .rts o '4..., Cu O c t 3 i H°) = v a 00 N .6 o O v 3 -o o) Oc O , N e-I 3 o E � _ a -0 v c U a � � � Ln \/ o -c 3 c' v 0 1 '� 4 W Q - U U a v o .o E a , z I V) .o ' a .o Q m +', m o 3 ° cuL a H ° o '� ry o cu .N a' N N v N Q ` a) N0 U � '0 � U __ 3 \ .. o _- a. c O N ; ..c , 1 Q. y C co a. 1 , 1U I o ..... � O — a • • a; i Al (iI I iA4i V/ S Vt ___ S %-I o M , ; P 5 p • 1 I 0`( ilo. o• tel+ f� Z 'I, 1 0 O 9i I j < C - I j i 0 eta8 0 ; . � a_ C ,O ,� {{g 'L O ~' .n 1 j 0 4/7 = Ick 41. - - t> o ; ,, 1 co l0 L 0 i v U.. N O o, v B . ;' ' CO c • Z QJ thu HI , v -a H3v� N13 >. a i .o La i s c .a ° I O o -0 �l N i O O o i U1 a o a:,' 0 U a ° oma 0, ° vv a >, O v 3 ° �' a °' ao 'aa um N a ° o, � ° c ' ( v c,o o + �. a, L.) a OCD Q00 N o ° c4a 4.4 IAL L' A • Lll > v c ° ° . c a +-' oQ 3 o a) ° r °i' � 3 v L. N �O `, O .-, �O �O on ti I�t..> O u ' vOi 'O 1 v i +� i ° c p D O -� 4 .o(4. Q .z' n vo 'a:, N N• in O i U O O o V v v a- c i 6•-1 4 u F� L o +' O Z U i N Q m Hi 0. •..-> ° o -... O 41 I- O Q . ill..4 U ll. v Z7 N j j c 1 11v .° s O O o in o b I a, iv aa °ZS CC c,v v° a i °iL Z ra _ 4.4 tgvl41,_, C OJ O O U ! h 1 o UH Uj� 1 Q o J� � • • To v I cV cu , ( 00 — L 0 V ECD aa) cn N cj O s r-I V Lll I IAp M c Cuco z N U, i Q QC = Can C 'i I ... U 1 sr, a O I I on LL N ,... 0_ 0 U • 4.-, . { � f,r� •a H _c a c U ' _ 1 cu 0' L i' 0_ Iu v 0 co OMO N _12 `o N = v) v I 1-aa o a' N v c 1 o., 0 ,n 1 L.f > a U Y z p O a� 0 -E• a Qm `L Q oO `ti c, - � +. a a. 'a .a N I v .c I ‘... c a tu) 3 c CT a 0 L a, c., a c c nct, a c a o. v 0 I v 0 � c - 0 a I a � U vCc , . o v, ...,-- , 0 —__L Q I.— g. ID • O O7 ' . • m (4 0 0 0 O O 0 0 0 13 0 0 0 0 0 0 0 0': 0 0 0 0 0 0 0 000000C/ 00 V Ev ; O '`' U a O 0 p ' ., 2 Y v N 0 O u a CL AO O oo �+ F _, Ln o m o co U 5 z e- a- a- a- c - 0 U ro tQ i; Ca z tap —v rn 0 ':i N C Q N N N N N N N N N a- N N N N N N 7 CJ aJ oo A' ,f I w' w T co C Q 6) 01 01 >. 01 01 0) 0 N a, h+ I-. C7 0) co 3 U lyi ro as ..r' 11 U Q 2 Q '' Q LL Q Q Q Q E Q QQ Q Q two to u .Y co a- O co M h 4 4 a, to N a) U C a.+ co 7-, O) N a- •- N N a- a- 0 a- X CL O Q ro c2 o 0 0 c----,/ z _1 o- , f O' w 0 H a O a O O w I--. w z 3 ¢ mm a0 � 0 02 0 u_ U u. mi u. 3 z 0 < 0 1.- O w > 0 d w w d w W > Z a.. (Et ~j x Vit; -1xaEtaF- xax0O waal0 I- O Cec=nCLLCLCL UCC " ° Ceou_ O 6- O p 000 O o O w 0 V O Y O W E2 W a W W Ly W W W w Q, J W W d O rL 0 2 a 2 2 X E X E U O. fn 2 -10_ ;D 'X 1_ LI® w N W: Q ei to cal v v> N N W'; _N X X X X X X X X X X X X X X X X H z W`; 0 m 1- r' cn _ ca ,e Wt C V w N O M N - a- M - N 04 co) an O O N M M O .rc•Y u4{°4' G p 0 0 0 p 0 0 0 0 0 0 0 0 0 0 O- u 6, no `i' O D U 0 0 -) 4 X O x , r" co a- o I . ,--, 0 z cco ccoo Q o 0 ccoo 0 in m nta N N a. co a A a o �' .z CO m U U m U CO U m U co U U U m OD bA 6 0 0 •- i. ' N > al _ e Com! v, , u, m .V N �.i ' x p Q cA G) 0 r-I C a cn a iIiIli 7 z > a. 0 �C (n M P m Q U x s ai U m 0- It,/ • CO, 3 N Q Q® x a m am Q —..), 1..., 111111 111111 If to 1O N N 00 E Q E o 6 o r M y +; En C N O p U O N M d O) N ,:t 00 CO > CO M Y C a Q M.,-z °0 Eu crinoN r 6 .-, (n M tWe O (0O d Q CO a)) � ' O T N O M V U U r 4N, N QcoQQMQ ,,NNm NN O l6 Q0DI, a _O ,- Y lfL E U mN U in c Z 0 Q N Q J m 7. d 6,▪ Cf C)Co C?C1 6 CI C)6,Ci 6, 6%, 0 7 7 7 7 C 7 C 36 7 C Q Q a a a a Q Q a Q Q a Q 00 O W r 4 O 'il: Oa O' f:', O' N N N N C] ;O) m x cU o Q D. w 00 0 aDAL 0cu 0 Z 0 a) 1- w J W W O O O EL 0 II 0 F. 001-0, 12 z 0o a OQaO W Q x z x z z x w w F a a _ O 0000 F Q w F. w D- D- aU 5' F-- U > C:1 m OOmQMMI = aOwQOu` � O z 2 E w O = x 2 O a O a r Q wwtamaUaoa� 2oviaaz E O oo - wo ►*- oom sa o m c CD o 0 0 <n a o 0 0 0 o c o 0 o 0 0 0 D- 0 - ° 909999999 m -, a - aw m0WmM0 )- = a mUUQZN -JDQ > W mmmQmmmmmmQ w0 N m CO o re -J o W U N O Q C N N ", = w @ U C _Cr •V Cr) J N U d O°'i d O LL O N a O m O O O Q a) m CD p� N r ;71 m m U 47 Z :° m a L � � N > � UUaa � Uo U ,o a Q O d N a L U t0 E 0 N W O U m et Y C:) O U) 4 O7 tO N C ? W 4x Cw O` O Q N a a m d Oa) • • Image Prcaj~~~ WWII Hi~~~-ry File ~QV~r I~ar~~ XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a spcrial rescan activity or are viewable by direct inspection of the file. ~~' ~ - 1 ~ ~ Well History File Identifier Organizing (done) ^ Two-sided III 111111 II III II III ^ Rescan Needed RESCAN DIGITAL DATA OVERSIZED (Scannable) ~olor Items: Diskettes No ~j ^ Ma s: , . p ~Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Da#e: ~ [~ /s/ Project Proofing BY: Maria Date: r, III 111111 IIIII II III /s/ Scanning Preparation ~ x 30 =1~ + ~~ =TOTAL PAGES rr~ _ (Count does not include cover sheet) BY: Maria Date: ~ /s/ Production Scanning III IIIIIIIIIII II III Stage 1 Page Gount fro m Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria ~' Date: ~„~ 0~ q~ /s/ ~,~~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II IIlI I II II IIIII ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked I II 1 111 11 II I IIII II I 10/6/2005 Wetl History File Cover Page.doc A- ~~: 7 . T` ,~ g ~ MLCROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 1'3~~~, i'~.~'Y ~ L~~rr llf ~'/ ~~. ~C 4~ V c~ August 14, 2009 y ~ bp ~~~~~~~~ OCT 0 6 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB V-Pad Dear Mr. Maunder, ~ladca Oi! ~ Gas Cons. ~amm~~~ia~ Artchorap~ ~p~O ~ ~ ~ ~ ~~ ~ a ~~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB V- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing e~ernal corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ! ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date V-pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitod sealant date ft bbls ft na al V-01 2040900 50029232100000 NA 2 NA 17 6/30/2009 V-02 2040770 50029232090000 NA 3 NA 43.4 7/11/2009 V-03 2022150 50029231240000 surface NA NA NA NA V-04 2061340 50029233220000 NA 1.5 NA 20.4 6/29/2009 V-05 2080930 50029233910000 NA 1.75 NA 20.4 5/10/2009 V-07 2071410 50029233720000 NA 0.25 NA 1.7 6/29/2009 V-100 2010590 50029230080000 NA 1.5 NA 20.4 5/9/2009 V-101 2020560 50029230740000 NA 3.75 NA 32.3 7/10/2009 V-102 2020330 50029230700000 NA 7.75 NA 98z 8/7/2009 V-103 2021860 50029231170000 NA 0.5 NA 9.4 7/12/2009 V-104 2021420 50029231030000 NA 1.5 NA 21.3 7/11/2009 V-105 2021310 50029230970000 NA 2.25 NA 23.8 6/29/2009 V-106A 2041850 50029230830100 NA 1.75 NA 17 6/29/2009 V-107 2021550 50029231080000 NA 1.75 NA 13.6 7/11/2009 V-108 2021660 50029231120000 NA 1.5 NA 14.5 7/10/2009 V-109 2022020 50029231200000 NA 1.2 NA 10.2 6/30/2009 V-t11 2031030 50029231610000 NA 1.5 NA 11.9 7/12/2009 V-112 2060200 50029233000000 NA 1.5 NA 15.3 5N 0/2009 V-113 2022160 50029231250000 NA 2.5 NA 37.4 5/10/2009 V-114A 2031850 50029231780100 NA 2.5 NA 34 6/30/2009 V-1t5 2040270 50029231950000 NA 1.5 NA 13.1 5/9/2009 V-117 2030900 50029231560000 NA 1.25 NA 22.1 5/10/2009 V-119 2040410 50029232010000 NA 2 NA 18.7 6/30/2009 V-120 2041790 50029232250000 NA 1.5 NA 8.5 7/12/2009 V-121 2070360 5~29233480000 NA 1.9 NA 17 6/30/2009 V-t22 2061470 50029233280000 NA 1.5 NA 6.8 5l10J2009 V-20~ 2012220 50029230540000 SC leak NA 4 NA 90.6 S/7/2009 V-202 2030770 50029231530000 NA 1.75 NA 12.8 7/11/2009 V-203 2051680 50029232850000 NA 2 NA 12.8 7/10/2009 V-204 2041310 50029232170000 NA 2 NA 22.1 6/30/2009 V-205 2061 S00 50029233380000 NA 1.8 NA 13.6 6/30/2009 V-207 2080660 50029233900000 NA 1.75 NA 1828 1/9/2009 V-210 2042100 50029232310000 NA 2 NA 18.7 7/11/2009 V-211 2042200 50029232320000 NA 1.5 NA 13.6 7/10/2009 V-212 2051500 50029232790000 NA 1.2 NA 11.9 6/29/2009 V-213 2041160 50029232130000 NA 1.75 NA 6.3 5/9/2009 V-214 2051340 50029232750000 NA 0.5 NA 9.4 7/11/2009 V-215 2070410 50029233510000 NA 2.8 NA 30.6 6/30/2009 V-216 2041300 50029232160000 NA 1.5 NA 13.6 6/29/2009 V-217 2061620 500292333aoo0o NA 2.3 NA 25.5 6/30l2009 V-218 2070400 50029233500000 NA 2 NA 17.9 7/12/2009 V-2t9 2081420 50029233970000 NA 1 NA 16.2 7/12/2009 "~ 2080200 50029233830000 NA 1.75 NA ~b 3/9/2008 V-221 2050130 50029232460000 NA 0.8 NA 8.5 6/29/2009 V-222 2070590 50029233570000 NA 2.5 NA 21.3 7/11/2009 V-223 2080220 50029233840000 NA 2 NA 20.5 9/7/2008 ~~ ~m DATA SUBMITTAL COMPLIANCE REPORT 11 /10/2008 Permit to Drill 2061470 Well Name/No. PRUDHOE BAY UN BORE V-122 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23328-00-00 MD 14437 TVD 6724 Completion Date 1/5/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Sur~ey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD GR, MWD / GR /RES / PWP /DEN / NEU, MWD / GR /RES / (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Tempe Med/Frmt Number Name _ _ Scale Media No Start Stop CH Received Comments L'ItD D Asc Directional Survey 0 14437 Open 1/23/2007 //pt Directional Survey 0 14437 Open 1/23/2007 , ICED D Asc Directional Survey 0 10685 Open 1/23/2007 PB 1 ~!r R' t Dir ctional S . p urvey e 0 10685 Open 1/23/2007 PB 1 ~ED D Asc Directional Survey 13458 13819 Open 1/23/2007 PB 2 .rL'bg 14357 Cement Evaluation 5 Col 1 100 10100 Case 1/29/2007 USCE, CBL, Orienting Sub ~ ~ 1-Jan-2007 ,f C Lis 14357 Gamma Ray 1 107 10094 Case 1/29/2007 LIS Veri, CET D C Lis 15210 Induction/Resistivity 387 14426 Open 6/11/2007 LIS Veri, GR, ROP, FET. DRHO, NPHI w/Graphics i, PDF & Txt og 15210 Induction/Resistivity 25 Blu 396 14437 Open 6/11/2007 MD Vision Service 30-Dec- 2006 og 15210 Induction/Resistivity 25 Blu 396 14437 Open 6/11/2007 TVD Vision Service 30- Dec-2006 D C Lis 15211 Induction/Resistivity 387 10674 Open 6/11/2007 PB1 LIS Veri, GR, ROP, FET. DRHO, NPHI w/Graphics PDF & Txt og 15211 Induction/Resistivity 25 Blu 396 10685 Open 6/11/2007 P61 MD Vision Service 16- Dec-2006 og 15211 Induction/Resistivity 25 Blu 396 10685 Open 6/11/2007 P61 TVD Vision Service / 16-Dea2006 ~~D C Lis 15212 Induction/Resistivity 387 13809 Open 6/11/2007 PB2 LIS Veri, GR, ROP, FET. DRHO, NPHI / w/Graphics PDF & Txt :/Log 15212 Induction/Resistivity 25 Blu 396 10685 Open 6/11/2007 P82 MD Vision Service 28- Dec-2006 f~ DATA SUBMITTAL COMPLIANCE REPORT 11 /10/2008 Permit to Drill 2061470 Well Name/No. PRUDHOE BAY UN BORE V-122 Operator BP EXPLORATION (ALASKA) INC MD 14437 TVD 6724 Completion Date 1/5/2007 Completion Status 1-OIL Current Status 1-OIL Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? 'f'71V~ Analysis `~`/-i'~F' Received? Daily History Received?1li N Formation Tops (J N API No. 50-029-23328-00-00 UIC N Comments: Compliance Reviewed By: _ ___. Date: r~ '' r~~' Sc6lum~erger ^", '~~~~ ~~,, ~1 `~,~1~~ 9 scnlumberger-ocs - ,. a:,_~..~,ef 1F~>}a~l'E9".:~9~°ak`L T525 Gambell St, Suite 400 ' ~ ~ _ Anchorage, AK 99503-2838 ^ `=. ATTN: Beth - Well Job # Log Description NO. 4292 Company: Alaska Oil & Gas Cons Comm AHn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Grion Borealis Date BL Color CD V-218. 11661147 MEMORY TEMP SURVEY 05119/07 1 Z-102 11637125 CEMENT IMAGE/BOND LOG 05N 6/07 1 V-04 V-214 L-250 V-122 40014377 40014206 40072593 40014531 OH EDIT MWD/LWD OH EDIT MWD/LWD OH EDIT MWDILWD OH EDIT MWDILWD 11/28/06 70130/06 17/09105 12!30/06 2 2 2 2 1 1 1 1 V-122P61 40014531 OH EDIT MWDILWD 12116106 2 1 V•122PB2 40014531 OH EDIT MWDILWD 12/28107 1 1 L-250L1 40012593 OH EDIT MWDILWD 17/15/05 / 1 L-250P61 L-04 OWDW-NW 40012593 40014142 11477941 OH EDIT MWD/LWD OH EDIT MWDILWD RST 10126105 10/09106 11/14/06 2 2 1 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: ~ 1.`~o't!b ~ i5 aid ~~sara Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage,AK 99503-2838 ATTN: Beth Received by: os/ono7 o• RECEIVED APR 1 1 n07 ~ STATE OF ALASKA • ~LASKA OIL AND GAS CONSERVATION COMMISSION Alaska Oil & Gasl~isi~lC~lli!@idETION OR RECOMPLETION REPORT AND LOG Anchorage Revised 04/10/07: Put on Production & survey correcnais 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Abar}d. 1/5/2007 ~ 12. Permit to Drill Number 206-147 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 12/5/2006 13. API Number 50-029-23328-00-00 4a. Location of Well (Governmental Section): Surface: 4711' FSL 1546' FEL SEC R11 7. Date T.D. Reached 12/30/2006 14. Well Name and Number: PBU V-122 , , . 11, T11 N, E, UM Top of Productive Horizon: 2595' FSL, 4538' FWL, SEC. 01, T11N, R11E, UM 8. KB Elevation (ft): 82.85 15. Field /Pool(s): Prudhoe Bay Field /Borealis Pool Total Depth: 4335' FSL, 1083' FWL, SEC. 07, T11N, R12E, UM 9. Plug Back Depth (MD+TVD) 14350 + 6721 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 590756 y- 5969961 Zone- ASP4 10. Total Depth (MD+TVD) 14437 + 6724 Ft 16. Property Designation: ADL 047450 TPI: x- 596799 y- 5973200 Zone- ASP4 Total Depth: x- 598669 y- 5969684 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Surve Y ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES / PWD /DEN /NEU, MWD / GR /RES /DEN /NEU, USIT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING' DEPTH MD SETTING DEPTH TVD MOLE AMOUNT SIZE WT. PER FT.- GwoDE TOP BOTTOM TOP :BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 178' Surface 178' 42" Pile Driven 9-5/8" 40# L-80 28' 3642' 28' 2849' 12-1/4" 626 sx Arcticset Lite 175 sx'G' 7" 26# L-80 25' 25' 6676' 8-3/4" 358 sx LiteCrete 162 sx Class 'G' 4-1/2" 12.6# L-80 10136' 14435' 6572' 6724' 6-1l8" 542 sx Class'G' 23. Perforations open to Production (MD + TVD of Top and 24. TuewG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 2-7/8" Gun Diameter, 6 spf 2-7/8" Gun Diameter, 6 spf 4-1l2", 12.6#, 13Cr80 x 3203' MD TVD MD TVD 3-1/2", 9.3#, 13Cr80 3203' - 10153' 10085' 10710' - 10800' 6716' - 6708' 12650' - 13000' 6718' - 6714' 10860' - 10970' 6703' - 6694' 13080' - 13200' 6714' - 6715' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11050' - 11150' 6689' - 6686' 13270' - 13310' 6714' - 6714' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 11210' - 11410' 6684' - 6679' 2.1/2" GD. 6 spf 2-1/2" GD. 6 spf 11470' - 11730' 6679' - 6684' 10311' Set Whipstock to Kick Off Pilot Hole 11790' - 12020' 6686' - 6686' 13650' - 13900' 6715' - 6714' 12080' - 12350' 6688' - 6702' 13960' - 14120' 6714' - 6719' ' ' ' ' 2600' Freeze Protect w/ 90 Bbls Diesel 14170 - 14335 6719 - 6721 26. PRODUCTION TEST Date First Production: March 9, 2007 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test 3/31/2007 Hours Tested 4 PRODUCTION FOR TEST PERIOD OIL-BBL 147 GAS-MCF 254 WATER-BBL 548 CHOKE SIZE 176 GAS-OIL RATIO 1,723 FIOW TUbing Press. 320 CaSing PfeSSUre 1,340 CALCULATED 24-HOUR RATE..' OIL-BBL 883 GAS-McF 1,521 WATER-BBL 3,285 OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate shee~,-i~gry). Submit core chips; if none, state "none". t~~ f None s ~F~ ~~R 2 ~ 200% IFi ~ Form 10-407 Revised 12/2003 R w ~ ~ ,~ ~ONTINUED ON REVERSE SIDE /knl-ll t t ~ ,(t-Jry' IGl 28. 29. ~ORMATION TESTS GEOLOGIC MARKS Include and briefly summarize test resuks. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 3742' 2909' None Ugnu M Sands 5729' 4119' Schrader Bluff N Sands 6109' 4350' Top Schrader Bluff O Sands 6372' 4511' Base Schrader Bluff /Top Colville 7010' 4887' H RZ 9904' 6423' Kalubik 10222' 6624' Kuparuk C 10307' 6674' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si d ~~ ~ gne Title Technical Assistant Date Terrie Hubble PBU V-122 206-147 Prepared By Name/Number. Telrle Hubble, 564-4628 Well Number Permit No. / A rOVal NO. Drilling Engineer: SCOtt KOlstad, 564-5347 INSTRUCTIONS GeNeRa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only .. -d~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION R~V~~ V ~~B .0 7 2aa7 WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1~Iaska Oil & Gas Cons. Cor»nn~ssiotrt 1 a. Well Status:. ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 1 b. Well Class: 20AAC 25.105 zoAAC zs.,,o ®Devetopment ^ Exploratory ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other ^ Stratigraphic ^ Service 2. Operator Name: 5. Date Comp., Susp., or Ab~p9. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 1/5/2007 ~~ D~ 206-147 ~ 3. Address: 6. Date Spudded ~,, 13. API Number ~ P.O. Box 196612, Anchorage, Alaska 99519-6612 12/5/~p8'/ Z>r~~ 50-029-23328-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached ~ 14. Well Name and Number, Surface: ' ' 12/30 ~ pa t, PBU V-122 4711 FSL, 1546 FEL, SEC. 11, T11N, R11E, UM Top of Productive Horizon: 8. KB Elevation (ft): 15. Field /Pool(s): 2595' FSL, 4541' FWL, SEC. 01, T11N, R11E, UM 82.85 Prudhoe Bay Field /Borealis Pool Total Depth: 9. Plug Back Depth (MD+TVD) 4335' FSL, 1086' FWL, SEC. 07, T11 N, R12E, UM 14350 ~ + 6721 ~ Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 590756 y- 5969961 Zone- ASP4 ~ 14437 "' + 6724 ' Ft ADL 047450 TPI: x- 596802 y- 5973200 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 598672 y- 5969685 Zone- ASP4 None MD 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey ®Yes ^ No N/A MSL 1900' (Approx. /N ~ ~ 21. Logs Run: MWD / GR, MWD / GR /RES / PWD /DEN /NEU, MWD / GR /RES /DEN /NEU, USIT ~ BO,~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH M0 SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE -TOP BOTTOM TOP BOTTOM SIZE .CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 178' Surface 178' 42" Pile Driven 9-5/8" 40# L-80 28' 3642' 28' 2849' 12-1/4" 626 sx Arcticset Lite 175 sx'G' 7" 26# L- 25' 25' 6676' 8-3/4" 35 sx Lite re a 16 sx Class 'G' 4-1/2" 12.6# L-80 10136' 14435' 6572' 6724' 6-1/8" 542 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SEr MD PACKER SET MD 2-7/8" Gun Diameter, 6 spf 2-7/8" Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr80 x 3203' MD TVD MD TVD 3-1/2", 9.3#, 13Cr80 3203' - 101.53' 10085' 10710' - 10800' 6716' - 6708' 12650' - 13000' 6718' - 6714 FRACTURE CEMENT SQUEEZE ETC. 25c ACID 10860' - 10970' 6703' - 6694' 13080' - 13200' 6714' - 6715' , , , 11050' - 11150' 6689' - 6686' 13270' - 13310' 6714' - 6714' DEPTH INTERVAL MD AMOUNT 8c KIND OF MATERIAL USED 11210' - 11410' 6684' - 6679' 2.1/2" GD. 6 saf 2-1/2" GD. 6 sDf 11470' - 11730' 6679' - 6684' 10311' Set Whipstock to Kick Off Pilot Hole 11790' - 12020' 6686' - 6686' 13650' - 13900' 6715' - 6714' 12080' - 12350' 6688' - 6702' 13960' - 14120' 6714' - 6719' ' ' ' ' 2600' Freeze Protect w/ 90 Bbls Diesel 14170 - 14335 6719 - 6721 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATeD OIL-BBL GAS-MCP WATER-BBL OIL GRAVITY-API (CORK) PreSS. 24-HOUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). w..~..z Submit core chips; if none, state "none". (}f} ~(.(~ jj yj ~~}t v)y ~~~ °" ~ i0~ ~, ~~5z.. ~ ~ ~ f ~ .:.! X, ia! V t t ~ b~ None ./ IF ~ Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ,./ ~RIGI~IAL `b 28 GEOLOGIC MARKER 29. RMATION TESTS Include and briefly summarize test results. List intervals tested, Nave MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 3742' 2909' None Ugnu M Sands 5729' 4119' Schrader Bluff N Sands 6109' 4350' Top Schrader Bluff O Sands 6372' 4511' Base Schrader Bluff /Top Colville 7010' 4887' H RZ 9904' 6423' Kalubik 10222' 6624' Kuparuk C 10307' 6674' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. O~ 7107 ~ Si d gne Title Technical Assistant Date / Terrie Hubble PBU V-122 206-147 Prepared By NameMumber. Terrie Hubble, 564-4628 Drilling Engineer : Scott Kolstad, 564-5347 Well Number Permit No. / A royal No. INSTRUCTIONS GeNew-L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: If no cores taken, indicate "None". ITeM 29: List alt test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only gp Page 1 of 1 Leak-Off Test Summary Legal Name: V-122 Common Name: V-122 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) ~ EMW 12/10/2006 LOT 3,669.0 (ft) 2,862.0 (ft) 11.99 (ppg) 457 (psi) 2,240 (psi) 15 06 (ppg) 12/19/2006 LOT 10,311.0 (ft) 6,683.0 (ft) 9.50 (ppg) 720 (psi) 4,018 (psi) 11.57 (ppg) C~ Printed: 1/8/2007 6:54:76 AM BP Operations Summary Report Page 1 of 21 Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ~' Task ~ Code ~ NPT ( Phase .~ Description of Operations 12/4/2006 00:00 - 01:30 1.50 RIGU P PRE Release rig from V-04 at 23:59 hrs. on 12-3-06. PJSM. Jack pits, remove mats & move pits from sub and around to V-122 01:30 - 04:00 2.50 RIGU P PRE Remove Mats from sub module. Move off of V-04. Move 1/16 mi. to Other side of pad. 04:00 - 05:30 1.50 RIGU P PRE Remove diverter line section from behind V-04. 05:30 - 08:00 2.50 RIGU P PRE Stage adapter flange, tree, tubing spool, &diverter line sections behind cunductor. Spot 20" Hydril on conductor. 08:00 - 16:00 8.00 RIGU P PRE Lay herculite. Ready V-122 for MIRU. Spot sub and remaining complexes. Level sub and pits. Bridle down and prepare pits for onloading fresh water. Accept Rig 1600 12/4/06 16:00 - 19:30 3.50 RIGU P PRE Take on fresh water and begin mixing spud mud. Nipple up diverter system. R/U drilling nipple and flowline. Load pipeshed with 4" drillpipe and BHA. Strap pipe and ready shed to P/U pipe. 19:30 - 00:00 4.50 RIGU P PRE Close in around cellar box. Prepare rig floor, pipe shed, and pits for drilling surface hole. Continue building spud mud. 12/5/2006 00:00 - 01:30 1.50 RIGU P PRE Build spud mud, load pipeshed, strapping DP, HWT and BHA. 01:30 - 03:30 2.00 RIGU P PRE PU 90 joints of 4" HT40 DP and stand back in the derrick 30 stands. 04:00 - 04:30 0.50 RIGU P PRE PU 24 joints of 4" HWDP, Jar stand and stand back in derrick. 04:30 - 05:00 0.50 RIGU P PRE Prepare rig floor to pick up BHA 05:00 - 06:00 1.00 RIGU P PRE Function test diverter system and accumulator. Witnessing of test waived by AOGCC rep Jeff Jones. Test witnessed by BP WSL Matt Martyn and NAD TP Brian Tiederman. 06:00 - 07:30 1.50 DRILL P SURF PJSM. Make up BHA #1 with 12.25" RR HTC MXL-01 bit, 1.83 deg PDM, LC, NM STAB, MWD, NM STAB, NM XO, UBHO, and 3 ea NM DC's. 07:30 - 08:30 1.00 DRILL P SURF Clean and clear rig floor. 08:30 - 09:30 1.00 DRILL P SURF Hold Pre-Spud meeting with rig crew and contractors.. 09:30 - 11:00 1.50 DRILL P SURF PJSM with Gyro Data and Sperry E-line. Hang sheave in derrick and rig up gyro tools. 11:00 - 11:30 0.50 DRILL P SURF Fill mud lines and conductor pipe. Check for leaks - OK. Test mud surface equipment to 3,000 psi - OK. 11:30 - 12:30 1.00 DRILL P SURF Wash pile driven conductor from 87' to 178'. 650 gpm, 1100 psi, PU / SO - 50k. Began to see gravel inside driven pipe at 158' md. 12:30 - 00:00 11.50 DRILL P SURF Spud V-122 12.25" surface hole and drill from 178' to 1,099'. Gyro surveyed hole every 100' to 814'. 600 gpm, 1,820 psi on, 1,623 psi off, 65 rpm, 4.1 k TO on, 2.1 k TO off, PU - 75k, SO - 63k, RWT - 70k, WOB - 5-20k. AST - 3.58 hrs, ART - 1.66 hrs. Wipe 30' prior to connections. Returns over shakers had gravel until -400' and and cleaned up significantly. Successfully used Screen Kleen to deal with clays blinding off shakers prior to 400'. Circulated up small amounts of wood near 850' md. No hydrates seen as of yet. 12/6/2006 00:00 - 04:45 4.75 DRILL P SURF Directionally drill 12.25" surface hole from 1,099' to 1,673'. 600 gpm, 2,172 psi on, 1,995 psi off, 60 rpm, 4.9k TO on, 2.Ok TO off, PU - 79k, SO - 66k, RWT - 70k, WOB - 25k. AST - 2.23 hrs, ART - 1.71 hrs. Wipe 30' prior to connections. Survey every 90'. Printed: 1/8/2007 6:54:22 AM gp Page 2 of 21 ~ Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date i Name: ell Name: e: Name: From - To V-122 V-122 DRILL+C NABOBS NABOBS Hours OMPLE ALASK 9ES Task TE A DRI Code ; ' ' LING NPT ~ Start I Rig Rig Phase Spud Date: 12/5/2006 : 12/4/2006 End: 1/5/2007 Release: 1/5/2007 Number: Description of Operations 12/6/2006 04:45 - 05:30 0.75 DRILL - P ~- --- _ SURF _ _.. Circulate 3 bottoms up. 600 gpm, 1950 psi, 60 rpm, 2.2k TO, PU - 79k, SO - 66k, RWT - 70k, MW - 9.2 ppg. 05:30 - 07:00 1.50 DRILL P SURF Monitor well - OK. POH for bit from 1,673' to 266'. PU - 75k, SO - 66 k. Pulled 20k over while pulling dry at 1,120' and 1,060'. On those 2 stands, pumped and rotated through (590 gpm, 1700 psi, 60 rpm, 2.5k TO) and never saw any indication of tight spot. 07:00 - 07:30 0.50 DRILL P SURF Stand back Jar stand and drill collar stand. 07:30 - 08:00 0.50 DRILL P SURF Clear and clean rig floor. 08:00 - 08:30 0.50 DRILL P SURF Break and change out bit to new MXL-1. Adjust motor bend from 1.83 deg to 1.5 deg. ', 08:30 - 09:00 0.50 DRILL P SURF Pick up drill collar and Jar stands. ~, 09:00 - 10:00 1.00 DRILL P SURF Run in hole with BHA #2 from 266' to 1,001' without problem. !, 10:00 - 11:00 1.00 DRILL P SURF Run in hole with BHA #2 from 1,001' to 1.,385'. Taking 5-15k weight intermittantly to 1,385' md. Wipe those areas okay. Set down at 1,385' md. 11:00 - 11:30 0.50 DRILL P SURF Ream down from 1,385' to 1,672'. 640 gpm, 2067 psi, 60 rpm, 2.1 k TO, PU - 79k, SO - 66k, RWT - 70k, MW - 9.2 ppg. 11:30 - 12:00 0.50 DRILL P SURF Directionally drill 12.25" surface hole from 1,672' to 1,712'. 600 gpm, 2,157 psi on, 1995 psi off, 80 rpm, S.Ok TQ on, 2.1 k TO off, PU - 80k, SO - 67k, RWT - 70k, WOB - 25k. AST - .36 hrs, ART - 0 hrs. Wipe 30' prior to connections. Survey every 90'. 12:00 - 21:00 9.00 DRILL P SURF Directionally drill 12.25" surface hole from 1,712' to Surface Hole TD @ 3,649' MD, 2,853' TVD. 700 gpm, 3,200 psi on, 3,040 psi off, 80 rpm, 7.2k TO on, 4.1 k TO off, PU - 105k, SO - 70k, RWT - 70k, WOB - 25k. AST - 2.70 hrs, ART - 3.57 hrs. ', Wipe 60' prior to connections. Survey every 90'. Some ', hydrates seen beginning ~ 2,400'. '~, 21:00 - 22:30 1.50 DRILL P SURF Circulate 3 bottoms up while reciprocating pipe 40' Hydrates ~' still breaking out until -2x BU. 700 gpm, 3,246 psi, 100 rpm, 3.9k TO, PU - 105k, SO - 60k, RWT - 76k, MW - 9.5 ppg, 250 viscosity. 22:30 - 23:00 0.50 DRILL P SURF POH for wiper trip from 3,649' to 3,469' with intermittent 10-20k drag. PU - 110k, SO - 70k Started swabbing. 23:00 - 23:30 0.50 DRILL P SURF Backream 1 stand out of hole from 3,469' to 3,390'. 600 gpm, 2,681 psi, 80 rpm, 5.6k TO. 23:30 - 00:00 0.50 DRILL P SURF POH dry from 3,390' to 2,916' with intermittent 5-20k drag. PU - 110k, SO - 70k. 12/7/2006 00:00 - 01:30 1.50 DRILL P SURF POH dry from 2,916' to 1,573' with intermittent 5-20k drag each tight spot wiped okay. PU - 110k, SO - 70k. 01:30 - 02:30 1.00 DRILL P SURF Run back in hole from 1,573' to 3,585' without pumping. Had occasional down drag and wiped out. Precautionary washed down last stand to bottom at 3,648'. i 02:30 - 03:30 1.00 DRILL P SURF Circulate 3 bottoms up reciprocating 40' to keep bit in SV1 t shale while circulating. Shakers clean. 700 gpm, 3,290 psi, 100 rpm, 4.Ok TO, PU - 110k, SO - 73k, MW - 9.5 ppg. 03:30 - 05:00 1.50 DRILL P SURF Monitor well - OK. PU - 110k, SO - 73k. POH to run surface casing from 3,648' to 1,940' with intermittant 5-15k drag. 05:00 - 05:30 0.50 DRILL P SURF At 1,940', well started swabbing w/ overpull of 25k. Backream 2 stands from 1,940' to 1,720'. PU - 100k, SO - 72k, ROT - 79k, 590 gpm, 1789 psi, 80 RPM, TO - 3.2k 05:30 - 06:30 1.00 DRILL P SURF POH to run surface casing from 1,720' to 1,001' with intermittant 5-15k drag. Wipe tight spot at 1,250' md. PU - 77k, Printed: 1/8/2007 6:54:22 AM g p Page 3 of 21 Operations Summary Report. Legal Well Name: V-122 Common W ell Name: V-122 Spud Date: 12/5/2006 Event Nam e: DRILL+C OMPLE TE Start : 12/4/2006 End: 1/5/2007 Contractor Name: NABOR S ALASK A DRI LLING I Rig Release: 1/5/2007 Rig Name: NABOR S 9ES Rig Number: ~ Date From - To Hours Task Code NPT Phase Description of Operations 12/7/2006 05:30 - 06:30 1.00 DRILL P SURF SO - 69k. 06:30 - 09:00 2.50 DRILL P SURF Stand back HWDP, Jar and DC stands from 1,001' to 78'. 09:00 - 09:30 0.50 DRILL P SURF PJSM. Laydown BHA #2: MWD, motor and bit. Bit grade: 0 - O-WT-A-E-IN-NO-TD 09:30 - 10:00 0.50 DRILL P SURF Clear and clean rig floor. 10:00 - 12:30 2.50 CASE P SURF Rig up to run surface casing.. Make dummy run with hanger and landing joint. 12:30 - 18:00 5.50 CASE P SURF PJSM. Pick up and Baker-Lok 9 5/8" shoe track. Check floats - OK. Run in hole with 88 joints 9 5/8" 40# L-80 BTC surface casing. Make up torque - 8,500 fUlbs avg. using Best-O-Life 2000 NM. Ran 25 bowspring centralizers on first 25 joints with 2 locked down 10 ft above Float Shoe and Float Collar. Fill every joint with casing fill-up tool. Had intermittent 10-20 drag to casing depth of 3,642'. No mud lost on trip in hole. Float Shoe @ 3,640' Float Collar ~ 3,556' 18:00 - 18:30 0.50 CEMT P SURF Rig down Franks tool and rig up cement head and hose. 18:30 - 20:00 1.50 CEMT P SURF Stage pumps up to 8 bpm, 489 psi and circulate and condition mud working pipe in 15 ft strokes. PU - 175k, SO - 85k. 20:00 - 23:00 3.00 CEMT N WAIT SURF Continue conditioning mud for cement job @ 8 bpm, 489 psi. MW - 9.5 ppg, Vis - 55, YP - 16. Waiting on two trucks for cementing. All other trucks showed up by 1800. 23:00 - 00:00 1.00 CEMT P SURF Continue circulating for cement job. Reciprocating pipe in 15' strokes PU - 180k, SO - 100k. All trucks on location. Hold PJSM w/ Schlumberger and rig persone- on location. 12/8/2006 00:00 - 03:30 3.50 CEMT P SURF Shut down pumps and switch to Dowell. Pump 5 bbls water and test lines to 3,500 psi - OK. Pump 78 bbls of 10.0 ppg MudPush II spacer ~ 5 bpm avg, 17 psi ICP, 119 psi, FCP. Drop bottom plug, pump 494 bbls of 10.7 ppg ArcticSet LiteCrete cement ~ 6 bpm avg, 195 psi ICP, 410 psi FCP. Landed casing on ring while switching over from Lead to Tail slurry as reciprocation was getting sticky after 1 BBL tail pumped. Pump 36.7 bbls of 15.8 ppg Class "G" cement ~ 5 bpm avg, 410 psi ICP, 400 psi FCP. Drop top plug and kick out same with 10 bbls of water. Switch to rig pump and displace cement with 260 bbls of 9.5 ppg mud ~ 5 bpm, 400 psi ICP, 500 FCP. Slowed pump to 2 bpm, 480 psi 5 bbls prior to bumping plug. Bump plug on schedule ~ 95% efficiency 2,730 stks with 1,100 psi. CIP ~ 03:27 hr. Bleed off pressure and check floats - OK. Reciprocated casing 15' until pumping tail slurry and had full returns during all of circulating cementing and displacement. Returned -95 bbls of sidewalk cement back to surface. PU - 185k, SO - 70k prior to landing casing. 03:30 - 04:30 1.00 CEMT P SURF Rig down cement head, flush riser, and laydown landing joint. 04:30 - 06:00 1.50 DIVRTR P SURF Nipple down surface diverter. Clean out cellar box. Remove 4" valves from conductor. Nipple down dresser sleave and riser, remove same from cellar. 06:00 - 10:00 4.00 DIVRTR P SURF Change out drilling nipple from 20" to 16". Clean out rotary drain pan. Remove surface hydril from well and secure in cellar, Bring tubing spool in from outside cellar. 10:00 - 10:30 0.50 WHSUR P SURF Prepare casing head for installation. Printed: 1/8/2007 6:54:22 AM BP Operations Summary Report Page 4 of 21 Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: i Date 'From - To Hours Task !Code NPT Phase I Description of Operations 12/8/2006 110:00 - 15:00 I 5.00 I W HSUR I N I HMAN I SURF 15:00 - 17:30 2.501 WHSUR P I SURF 17:30 - 18:30 1.00 BOPSU~ P SURF 18:30 - 23:00 4.50 BOPSU P SURF 23:00 - 23:30 0.50 BOPSU P SURF 23:30 - 00:00 0.50 DRILL P INT1 18:30 - 20:00 1.50 DRILL P INT1 20:00 - 00:00 4.00 DRILL P INT1 12/9/2006 100:00 - 03:30 I 3.501 DRILL I P I I INT1 03:30 - 05:00 I 1.501 DRILL I P I I INT1 05:00 - 05:30 I 0.501 DRILL (P I I INT1 05:30 - 07:30 2.00 DRILL P INTi 07:30 - 10:30 3.00 DRILL P INT1 10:30 - 11:00 I 0.501 DRILL P I INT1 11:00 - 11:30 0.50 DRILL P INT1 11:30 - 12:30 1.00 DRILL P INTi 12:30 - 15:00 2.50 DRILL P INTi 15:00 - 15:30 0.50 DRILL P INT1 15:30 - 18:00 2.50 DRILL P INT1 18:00 - 18:30 I 0.50 (DRILL I P I I INT1 18:30 - 19:00 I 0.501 DRILL I P I I INT1 19:00 - 20:30 I 1.501 DRILL I P I I INT1 9-5/8 casing hanger metal-to-metal seal damaged by landing joint while pulling joint out of hole. Based on the 1/4" depth of the damage to the top of the sealing ring, the cause was an inadvertant slack-off of the landing joint during removal. During the slack-off, the joint must have lodged on an edge, and come free falling a few inches prior to striking the casing hanger. Expedite welder to location and repair casing hanger. Install casing head. Spot tubing spool and adapter on wellhead. Set ROPE on adapter for weight. Test metal to metal seal to 1,000 psi - 10 minutes - OK. Torque tubing head to casing head bolts. Nipple up BOPE. Rig up and pressure test BOPE to 250 low psi for 5 minutes each, 3,500 high psi for 5 minutes each. After cycling new element several times, test annular preventer to 250 low psi for 5 minutes, 3,500 high psi for 5 minutes. Perform accumulator drill (D4). Test waiveded by AOGCC rep Chuck Scheve, BP night WSL Matt Martyn, NAD night TP Brian Tiedemann. Rig down test equipment, install wear bushing, laydown test joint and blowdown Tines. RU floor to pick up 4" drill pipe singles. POH standing back drill pipe from 3,025' to surface. Pick up 4" drill pipe singles needed to TD intermediate hole out of pipe shed to 3,025'. Pick up 4" drill pipe singles needed to TD intermediate hole out of pipe shed to 2,850'. Cut and Slip 92' of drilling line, service topdrive, & clean under drawworks. Pull one stand from hole and clabbered up mud was caked inside stand. Circulate to clean clabbered up mud from 90 joints in hole. 495 gpm & 420 psi while pumping. POH standing back drill pipe from 2,850' to Surface. Pick up 4" drill pipe singles needed to TD intermediate hole out of pipe shed to 1,860'. Circulate to clean clabbered up mud from 60 joints in hole. 495 gpm & 260 psi while pumping. HSE Standdown POH standing back drill pipe from 1,850' to Surface. PJSM. Pick up and make up BHA #3: New 8 3/4 Hycalog RSX616M, Powerdrive 675, LWD/ARC, MW D, ADN, NM DC, NM STAB, NM DC, Saver Sub, 1 ea 5" HWDP, JAR, lea 5" HWDP, XO, 24 ea 4" HWDP. Shallow hole test MWD - OK. 550 gpm, 1,389 psi. Run in hole with BHA #3 picking up drill pipe out of pipe shed from 993' to 3,225'. Continue running in hole w/drill pipe out of derrick to 3,381'. Fill pipe and clear air out of system. Pressure test 9 5/8" 40# L-80 BTC casing to 3,500 psi for 30 minutes - No pressure loss. Wash down from 3,384 - 3,543'. Obtain paramters. Pumps off: PU - 119, SO - 64. Pumps ~ 450gpm: PU - 113k, SO - 61 k, ROT - 80k, 60rpm, 6k TO, PSI off - 1860. Printed: 1/8/2007 6:54:22 AM gp Page 5 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: i Date ~ From - To Hours Task I Code NPT Phase 12/9/2006 119:00 - 20:30 1.501 DRILL P 20:30 - 00:00 I 3.501 DRILL I P 12/10/2006 100:00 - 00:30 0.501 DRILL P 00:30 - 01:00 0.501 DRILL I P 01:00 - 01:30 I 0.501 DRILL I P 01:30 - 02:00 I 0.501 DRILL I P 02:00 - 07:00 I 5.001 DRILL I P 07:00 - 07:30 I 0.50 I DRILL I P 07:30 - 08:30 I 1.001 DRILL I P 08:30 - 09:00 0.50 DRILL P 09:00 - 12:00 3.00 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 12/11 /2006 100:00 - 06:00 06:00 - 12:00 6.001 DRILL I P 6.001 DRILL I P INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INTi INT1 INT1 INT1 Description of Operations Adjusted parameters due to shock risk to 500gpm: PSI on 1863, off 1835, 30-60 rpm. Tag up on cement at 3,543. Drill cement. WOB 1-5k. PSI on btm 1891. Tag float collar ~ 3,555'. After 30 min on float collar w/ 5k WOB, increase to 7.5k. Worked through collar & continue drilling out cement and shoe to 3,641'. 500 gpm, 1,885 psi, 60 rpm, 6.3k TO on, 5.5k TO off. Clean out rat hole from 3,641' to 3,649' and drill 26' of new hole from 3,649' to 3,675'. 514 gpm, 1,750 psi on, 1,700 psi off, 60 rpm, 6.7k TO on 5.9k TO off, PU - 120k, SO - 64k, ROT - 80k, WOB 5k. Swap out mud system from old thinned back 9.5 ppg spud mud used to drill cement to 8.9 ppg LSND ~ 517gpm, 1250psi, 60rpm, 5.8k TO, PU - 120k, SO - 68k, ROT - 82. Perform LOT. MD - 3,675', TVD - 2,862', MW - 8.9 ppg, TP - 457 psi = EMW - 12.00 psi. Contact SDE Rob Tirpack in town and receive approval to drill ahead w/ 12.Oppg LOT. Obtain benchmark ECD's and slow pump rates. 590 gpm, 1,430 psi, 130 rpm - 9.32 ppg Calc ECD, 9.35 actual static ECD, 9.39 actual Rotating ECD. Directionally drill 8.75" intermediate hole from 3,405' to 4,160'. 585 gpm, 1,655 psi on, 1,640 psi off, 110 rpm, 5.8k TO on, 5.Ok TO off, PU - 120k, SO - 78k, RWT - 85k, WOB - 5-10k. ART - 3.32 CECD - 9.33 ppg, AECD - 9.5 ppg. Backream 90' prior to connections. Survey every 90'. CBU. 588 gpm, 1,790 psi, 80 rpm, 4k TO, CECD - 9.31 ppg, initial AECD - 9.87 ppg, final AECD - 9.78 ppg. Backream out of the hole 5 stand short trip from 4,160' to 3,675'. Reposition ghost reamer to 4,733' from bit. 406 gpm, 1,080 psi, 60 rpm, 4.7k TO, RWT - 83k. RIH back to 4,058'. Wash down last stand. Directionally drill 8.75" intermediate hole from 4,160' to 4,531' md/ 3,389' TVD. 588 gpm, 1,945 psi on, 1,930 psi off, 80-130 rpm, 6.1 k TO on, 5.5k TO off, PU - 115k, SO - 75k, RWT - 90k, WOB - 5-10k, CECD - 9.41 ppg, AECD - 9.49 ppg, ART - 3.22 hrs. Backream 30' prior to connections. Directionally drill 8.75" intermediate hole from 4,531' to 5,675' MD / 4,086' TVD. 588 gpm, 2,360 psi on, 2,352 psi off, 60 - 140 rpm, 6.5k TO on, 6.Ok TO off, PU - 123k, SO - 83k, RWT - 101k, WOB - 5-10k, CECD - 9.41 ppg, AECD - 9.63 ppg. ART - 8.35 Backream 30' prior to connections. Pumped 30 bbl Hi-Vis sweep ~ 4,924' MD and had 50% increase in cutting once back around. Directionally drill 8.75" intermediate hole from 5,675' to 6,150'. 588 gpm, 2,530 psi on, 2,510 psi off, 60-140 rpm, 7k TO on, 5k TO off, PU - 135k, SO - 85k, RWT - 105k, WOB - 3-10k, CECD - 9.49 ppg, AECD - 9.80 ppg. Backream 30' prior to connections. Directionally drill 8.75" intermediate hole from 6,150' to 6,551' md/ 4,619'tvd. 588 gpm, 2,645 psi on, 2,630 psi off, 60-140 rpm, 6k TO on, 4.6k TO off, PU - 131 k, SO - 92k, RWT - 101 k, WOB - 5-10k, MW = 9.Oppg CECD - 9.51 ppg, AECD - 9.97 ppg. Backream 30' prior to connections. ART from Printed: 1/8/2007 6:54:22 AM gp Page 6 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABORS 9ES Rig Number: Date Prom - To Hours ~ Task ' Code NPT ', Phase ----- ---- - 12/11/2006 06:00 - 12:00 6.00 DRILL P INT1 12:00 - 00:00 12.00 DRILL P INT1 12/12/2006 00:00 - 06:00 6.00 DRILL P INT1 06:00 - 12:00 6.00 DRILL P INT1 12:00 - 00:00 12.00 DRILL P INT1 12/13/2006 00:00 - 07:00 7.00 DRILL P INT1 07:00 - 10:00 3.00 DRILL N SFAL INT1 10:00 - 12:00 2.00 DRILL P INT1 12:00 - 00:00 I 12.001 DRILL I P I i INTi ~ 12/14/2006 ~ 00:00 - 04:30 ~ 4.50 ~ DRILL I P ~ (INT1 Description of Operations 00:00-12:00 = 9.82hr. Pumped to-hi-vis (15bb1 H2O followed by 30bb1 hi-vis mud) sweep around at 6,359' and w/o much result. Possibly 10% increase in cuttings once around. Directionally drill 8.75" intermediate hole from 6,551' to 7,183' md/ 4,966' tvd. 588 gpm, 2,858 psi on, 2,845 psi off, 60-135 rpm, 6.2k TO on, 5.3k TO off, PU - 132k, SO - 94k, RWT - 111k, WOB - 3-15k, MW = 9.1ppg CECD - 9.67 ppg, AECD - 9.92 ppg. Backream 30' prior to connections. Survey every 90'. ART from 12:00-24:00 = 9.06hr. Directionally drill 8.75" intermediate hole from 7,183' to 7,585'. 588 gpm, 3,000 psi on, 2,950 psi off, 60-140 rpm, 7.9k TO on, 5.4k TO off, PU - 135k, SO - 94k, RWT - 111 k, WOB - 5-15k, CECD - 9.55 ppg, AECD - 9.96 ppg. Backream 30' prior to connections. Survey every 90'. Directionally drill 8.75" intermediate hole from 7,585' to 8,052' md/ 5,359'tvd. 588 gpm, 3,182 psi on, 3,170 psi off, 60-190 rpm, 8.5k TO on, 5.9k TO off, PU - 140k, SO - 94k, RWT - 115k, WOB - 5-10k, MW = 9.2ppg CECD - 9.61 ppg, AECD - 10.28 ppg. Backream 30' prior to connections. Survey every 90'. ART from 00:00-12:00 = 9.11 hr. Directionally drill 8.75" intermediate hole from 8,052' to 8,502' md/ 5,568' tvd. 588 gpm, 3,195 psi on, 3,180 psi off, 60-190 rpm, 7.8k TO on, 5.4k TO off, PU - 146k, SO - 99k, RWT - 119k, WOB - 3-15k, MW = 9.1ppg CECD - 9.64 ppg, AECD - 10.08 ppg. Backream 30' prior to connections. Survey every 90'. ART from 12:00-24:00 = 9.93hr. Directionally drill 8.75" intermediate hole from 8,502' to 8795 (5727' tvd)'. 588 gpm, 3,290 psi on, 3,350 psi off, 60-190 rpm, 8.9k TO on, 5.5k TO off, PU - 151 k, SO - 100k, RWT - 122k, WOB - 5-15k, CECD - 9.48ppg, AECD - 10.14 ppg. Backream 30' prior to connections. Survey every 90'. Troubleshoot 930 psi pressure loss -Clean & inspected suction and discharge screens on #1 Mud Pump, O.K. On Inspection of # 2 Mud Pump found valve seat came un seated Repair #2 mud pump valve seat Circ. with #1 ~ 284 gpm / 1030 psi, 60 rpm / 5.8 TO Directionally drill 8.75" intermediate hole from 8,795' to 8,918' md(5,802'tvd). 588 gpm, 3,380 psi on, 3,520 psi off, 60-180 rpm, 8.7k TO on, 6.7k TO off, PU - 157k, SO - 102k, RWT -122k, WOB - 5-15k, MW = 9.1ppg CECD - 9.48 ppg, AECD - 10.16 ppg. Backream 30' prior to connections. Survey every 90`. ART from 00:00-12:00 = 8.03hr. Directionally drill 8.75" intermediate hole from 8,918' md- 9456'md (6124'tvd). 588 gpm, 3,550 psi on, 3,550 psi off, 60-190 rpm, 7.5k-10kT0 on, 6-8k TO off, PU - 172k, SO - 106k, RWT -131 k, WOB - 5-15k, MW = 9.1 ppg CECD - 9.48 ppg, AECD -9.97 ppg. Backream 30' prior to connections. Survey every 90'. ART from 12:00-24:00 = 9.9hr. Directionally drill 8.75" intermediate hole with the rotary steerable BHA from 9,456' and - 9,515'md/ 6,166' tvd. 588 Printed: 1/8/2007 6:54:22 AM • • BP Page 7 of 21 Operations Summary Report Legal Well Name: V-122 Common W ell Name: V -122 Spud Date: 12/5/2006 Event Nam e: DRILL+C OMPLE TE Start : 12/4/2006 End: 1/5/2007 Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 1/5/2007 Rig Name: NABOB S 9ES Rig Number: ~ ~ Date ! From - To Hours , Task Code :. NPT Phase Description of Operations 12/14/2006 00:00 - 04:30 4.50 DRILL P INT1 gpm, 3,625 psi on, 3,610 psi off, 60-180 rpm, 6.5k-12kT0 on, 6.5k TO off, PU - 179k, SO - 102k, RWT -131k, WOB - 5-15k, MW = 9.1 ppg CECD - 9.48 ppg, RECD -9.97 ppg. ART - 3.77 hrs. Backream 30' prior to connections. Surrey every 90'. ROP decreased to a sustained 0-20 fph from 00:00 to 04:00 hours. Unable to put more than 60 rpm to bit due to high stick slip and shock associated with the RPM increase. Decide to try a 50 ~I bbl 10% LoTorq pill to try to help the issue. Already running 3% tubes. 04:30 - 06:30 1.50 DRILL P INTi After pumping tube pill around and seeing no better stick slip response or ROP break, CBU prior to POOH. 588 gpm, 3550 psi, 130k RWT, 90 rpm, 6.5k TO, CECD = 9.53, AECD = 9.78 PPg• 06:30 - 08:00 1.50 DRILL P INT1 After bottoms up circulate in 290 bbls 14.3ppg spike fluid and circ around to weight mud system up to 10.6 ppg. 588gpm, 3935psi, RTW - 130k, 90 RPM, 6.3k TO. Off bottom, still seeing -120-150 rpm of stick slip downhole. 08:00 - 08:45 0.75 DRILL P INT1 MW in - 10.6ppg, MW out - 10.6 ppg, PU - 170k, SO - 105k. Monitor the well -stable. Trip out of the hole from 9,517 - 9,220'. Intermittent overpulls to 30k and swabbing. 08:45 - 12:00 3.25 DRILL P INT1 Backream out of the hole from 9,220' to 8,173' - 502 gpm, 80 rpm, 6-10k TO, 3,100 psi, RTW - 120k. Tried several times I over this interval to pull without pumps or rotary without success. CECD - 10.94, AECD - 11.68. 12:00 - 15:00 3.00 DRILL P INT1 Backream out of the hole from 8,173' to 7,506' - 510 gpm, 80 rpm, 6-7k TO, 3,150 psi, PU - 150k, RTW - 120k, SO - 100k. CBU from 7,602' - 7506'. Check for swabbing, OK. 15:00 - 19:00 4.00 DRILL P INT1 Pump dry job, and POH from 7,506' to 3,579. Monitor well at shoe. OK, PU - 107k, SO - 75k. Continue POH to 1,471' 19:00 - 21:30 2.50 DRILL P INT1 Safety standown. Entire evening crew (Sean Holcombe Crew) present along w/ Mike Schultz(BP), Dan Hebert(NAD), Peter Bordsma (RLG), Lynne Dittmer (RLG), Jeff Kilfoyle(BP), Bill Bixby(NAD), Brian Buzby (ASRC), Matt Martyn(BP), Chris MacKinnon (MI), Roberto Esquintin (Mq, Rod Maniaci (SLB), ', John Rathert (SLB), Tania Cunningham (PRA), Mark St. Amour (SLB) l 21:30 - 00:00 2.50 DRILL P INT1 Safety standown. Entire morning crew (Randy Axness Crew) i present along w/ Mike Schultz(BP), Dan Hebert(NAD), Peter Bordsma (RLG), Roy Hunt(NAD), Matt Marlyn (BP), Dave Newland (ASRC), Roberto Esquintin (MI), Ted Neville (SLB), Fabricio Bezerra (SLB). 12/15/2006 00:00 - 00:30 0.50 DRILL P INT1 Pre-Tour meeting held after safety standown. 00:30 - 03:30 3.00 DRILL P INT1 PJSM. Handle BHA#3. Stand back the jar stand and LD the dc's. Remove the nuclear source and LD the ADN, MWD, LWD/ARC, and PowerDRIVE components. Breakout and LD the bit. 8-3/4" RSX-616 graded: 1-2-BT-S-X-I-NO-PR. Total of 6 broken teeth on bit, all on shoulder. Outer 2 nozzles showed ', signs of more flow than inner 4 (wrench port was eroded more on each outer nozzle). 03:30 - 04:00 0.50 DRILL P INT1 Clear and clean the floor. 04:00 - 06:00 2.00 DRILL P INT1 PJSM. MU BHA#4, Changed out bit MU steerable motor assembly. BHA#4 - 8-3/4" RB HCM506ZX, 6-3/4" 4/5 70XP motor w/ 1.50 deg bend, NM Stab, LWD/ARC, MWD, ADN, 2 x Printed: 1/8/2007 6:54:22 AM i i BP Operations Summary. Report Legal Well Name: V-122 Common Well Name: V-122 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date 'From - To Hours ~ Task Code NPT 12/15/2006 ~ 04:00 - 06:00 2.00 ~ DRILL ~ P 06:00 - 08:30 2.50 DRILL P 08:30 - 10:00 1.50 DRILL P 10:00 - 12:30 I 2.501 DRILL I P 12:30 - 13:00 0.50 DRILL P 13:00 - 00:00 11.00 DRILL P 12/16/2006 ~ 00:00 - 04:00 4.00 ~ DRILL P 04:00 - 04:30 I 0.501 DRILL I P 04:30 - 07:30 I 3.001 DRILL I P 07:30 - 08:00 0.50 DRILL P 08:00 - 09:00 1.00 DRILL P 09:00 - 11:00 2.00 I DRILL P 11:00 - 11:30 0.50 DRILL P 11:30 - 14:00 2.50 DRILL P 14:00 - 21:00 I 7.001 DRILL I P Start: 12/4/2006 Rig Release: 1/5/2007 Rig Number: Phase Page 8 of 21 Spud Date: 12/5/2006 End: 1 /5/2007 Description of Operations INTi nm dc's, saver sub, 1 x 5" HWDP, jar, 1 x 5" HWDP, xo. Load nuclear source and RIH to 257'. Function tested BOPE INT1 RIH with 4" DP from 257' to 1,087'. Shallow test the MWD - good. 500 gpm, 1680 psi. Continue to RIH to 3,578'. INT1 Clear and clean the floor. Service top drive and crown. Cut and slip 49' of drilling line. INT1 RIH to open hole from 3,578' to 9,415'. PU - 105k, SO - 70k 9-5/8" shoe. Fill pipe at 6,600' md. No problems RIH. INT1 Wash down last stand to 9,513' md. OK INT1 Directionally drill 8.75" intermediate hole with motor BHA from 9,517md to 10,155'md / 6,581vd. 588 gpm, 4,190 psi on, 3,945 psi off, 80 rpm, 6-10kT0 on, 6.5k TO off, PU - 172k, SO - 109k, RWT - 133k, WOB - 5-15k, MW = 10.6ppg CECD - 11.04 ppg, AECD - 11.39 ppg. AST - 5.55, ART - 1.98 hrs. Backream 30' prior to connections. Survey every 90'. INT1 Directionally drill 8.75" intermediate hole with motor BHA from,,, 10,155'md to 10,466'md/ 6,764tvd. 505 gpm, 4,210 psi on, 3,980 psi off, 80 rpm, 6-10kT0 on, 6.5k TO off, PU - 174k, SO - 110k, RWT - 135k, WOB - 5-15k, MW = 10.6ppg CECD - 11.06 ppg, AECD - 11.36 ppg. Backream 30' prior to connections. Survey every 90'. INT1 Mad Pass last stand 10,372 - 10,465' for realtime data gap from MWD unable to sync while rotating last stand. Realtime data needed for TD pick. INT1 Directionally drill 8.75" intermediate hole with motor BHA from 10,466'md to 10,685' md. 502 gpm, 4,253 psi on, 3,969 psi off, 80 rpm, 11-12kT0 on, 9.6k TO off, PU - 190k, SO - 100k, RWT - 136k, WOB - 15k, MW = 10.6ppg CECD - 11.05 ppg, AECD - 11.24 ppg. Backream 30' prior to connections. Survey every 90'. Pumped weighted sweep at 10,645' while circulating prior to trip. Dumped weighted sweep when back to surface, no increase in cuttings. Drilled an additional 40' tp 10,685' per geo for further logs to investigate deeper sand. AST - 1.01 hr, ART - 3.67hrs. INT1 CBU. 500 gpm, 4005 psi. Reciprocate and rotate at 80 rpm while circulating. INTi POH pumps off 6 stands from 10,685' to 10,060' PU - 195k SO - 110k. Pull into tight spot (25k over) with bit depth of 10,060. INT1 Backream from 10,060' - 9,322' (2 stands above BHA#3 run). 492 gpm, 3,910 psi, 80 rpm, 8.5k TO, RWT - 136k. INTi RIH from 9,322' - 10,685' pumps off. PU - 225k, SO - 85k. Wash last single down to bottom. No problems RIH. INT1 Circulate and condition mud. Stage pumps up to 502 gpm. CBUx3, 4000 psi, 80 rpm, TO - 12k, RTW - 137k. Circulated 1 bottoms up with old mud with 200-300% increase in sand over shakers. Then pumped 12.6 ppg weighted sweep surface to surface, and saw no cuttings increase. CECD - 11.05ppg, AECD -Init. 11.37, Fin. 11.09 ppg. No mud losses during circulation. INT1 Monitor well - OK. PU - 225k, SO - 95k. POH to run intermediate casing from 10,685' to 9,705' with intermittant 5-10k drag. Pump dry job ~ 9,705' and POH to 3,640'. Printed: 1/8/2007 6:54:22 AM ~ i BP Operations Summary Report Page 9 of 21 Legal Well Name: V-122 ...Common Well Name: V-122 Spud Date: 12/5/2006 'Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABORS 9ES Rig Number: Date Prom - To ~ Hours I Task Code NPT ( Phase 12/16/2006 14:00 - 21:00 ~ 7.00 ~ DRILL ~ P ~ ~ INT1 21:00 - 23:00 I 2.001 DRILL I P 23:00 - 00:00 1.00 DRILL P '.12/17/2006 00:00 - 00:30 0.50 BOPSU P 00:30 - 02:00 1.50 BOPSU P 02:00 - 03:30 I 1.501 CASE I P 03:30 - 10:30 I 7.001 CASE I P 10:30 - 11:00 0.501 CASE P 11:00 - 14:00 I 3.001 CASE I P 14:00 - 14:30 0.50 CASE P 14:30 - 18:00 3.50 CASE P 18:00 - 18:30 I 0.501 CASE I P 18:30 - 00:00 I 5.501 CASE I P j 12/18/2006 100:00 - 01:00 1.001 CASE ~ P Description of Operations Monitored well at shoe - OK. Hole took the proper displacement. Continue POH to BHA. Monitor well, PJSM on source and handling BHA #4. POH, LD Jar w/ Hwt, Std of DC's, MW D tools, motor and bit. Bit grade: 0 -1 -CT-G-X-I-NO-TD. Clear and clean rig floor. Pull wear bushing. Flush BOP stack. Install ROPE test plug. Change out top rams from 3.5" x 6" VBR's to 7". -Function Test all rams -Test and chart same to 250 low psi / 3,500 high psi - OK. -Test Witness by NAD TP, Roy Hunt, BP WSL, Matt Martyn, Dave Newton Make up Franks tool & Rig up to run 7" BTC-M x TCII intermediate casing. Make dummy run with 7" hanger and landing joint. Pick up and make up 7" shoe track. Baker-Lok'd shoe track connections. Fill pipe and check floats - OK. Run in hole with 7" 26# L-80 BTC casing to 3611' @ 1-1/2 minutes per joint running speed. Filled every joint and circulated every 10 joints down for 3 minutes ~ 6 bpm. Average make up TO - 9,000 fUlbs using Best-O-Life 2000 NM pipe lubricant. No mud losses. Circulate 1-1/2 annulus volumes ~ 9 5/8" shoe. - staged up to 6 bpm, 480 psi. - PU - 105k, SO - 79k. - No mud losses to formation Continue to Run in hole with 7" 26# L-80 BTC casing to 5539' 1-1/2 minutes perjoint running speed. Filled every joint and circulated every 10 joints down for 3 minutes ~ 6 bpm. Average make up TO - 9,000 fUlbs using Best-O-Life 2000 NM pipe lubricant. 6 bpm = 735 psi No mud losses to formation Rig up 7" TC II casing handling equipment Continue to Run in hole with 7" 26# L-80 TC-II casing from 5539' to 6978' ~ 1-1/2 minutes perjoint running speed. Filled every joint and circulated every 10 joints down for 3 minutes ~ 6 bpm. 6 bpm = 735 psi -Average make up TO-10,100 fUlbs using JSLG pipe dope. No mud losses to formation Circulate 1x annulus volume - staged up to 6 bpm, 735 psi. PUW - 170k /SOW - 90k - No mud losses to formation Continue to Run in hole with 7" 26# L-80 TC-II casing from 6978' - 10,002' ~ 1-1/2 minutes perjoint running speed. Filled every joint and circulated every 10 joints down for 3 minutes 6 bpm. 6 bpm = 740 psi -Average make up TO-10,100 fUlbs using JSLG pipe dope. PUW - 265k /SOW - 105k No mud losses to formation Continue to Run in hole with 7" 26# L-80 TC-II casing from 10,002' - 10675 @ 1-1/2 minutes perjoint running speed. INT1 INT1 INT1 INT1 INT1 INT1 INTi INT1 INT1 INT1 INT1 INT1 INT1 Printed: 1/8/2007 6:54:22 AM • BP Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 'Event Name: DRILL+COMPLETE ~iContractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To ~ Hours ~ Task Code N PT 12/18/2006 100:00 - 01:00 I 1.001 CASE I P 01:00 - 01:30 I 0.50 f CEMT ( P 01:30 - 04:30 I 3.001 CEMT I P 04:30 - 06:00 I 1.50 I CEMT I P 06:00 - 09:00 I 3.001 CEMT I P 09:00 - 10:00 I 1.001 CEMT P 10:00 - 10:30 I 0.501 CEMT I P 10:00 - 13:30 2.50 BOPSUR P 13:30 - 14:00 0.50 BOPSUF~ P 14:00 - 14:30 0.50 EVAL I P 14:30 - 15:00 0.50 STWHIP P 15:00 - 16:30 1.50 STWHIP P 16:30-17:30 1.00 STWHIP P 17:30 - 19:30 2.00 STWHIP P 19:30 - 22:30 I 3.001 STWHIP P 22:30 - 23:00 0.50 STWHIP P 23:00 - 00:00 1.00 STWHIP P Start: 12/4/2006 Rig Release: 1/5/2007 Rig Number: Phase INT1 INT1 INT1 INTt INT1 INT1 INT1 INT1 INT1 INTi INT1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 PROD1 Page 10 of 21 Spud Date: 12/5/2006 End: 1 /5/2007 Description of Operations Filled every joint and circulated every 10 joints down for 3 minutes ~ 6 bpm. 6 bpm = 740 psi -Average make up TO-10,100 ft/Ibs using JSLG pipe dope. -M/U Landing Jt. and Landed casing PUW - 320k /SOW - 105k No mud losses to formation Rig Down 7" casing slips and Franks fill up tool R/U Cement head and cement hose Break Circulation staging up slowly to 6 bpm / 720 psi Reciprocating pipe 10' strokes, PUW - 320k /SOW - 103k Pre-job safety meeting with rig crew and D/S cementers Continue to circ. while Dowell batch mixed slurry 6 bpm / 700 psi PJSM, Pump 5 bbls of water, Test lines to 4000 psi, O.K. Dowell pump 70 bbl of 11 ppg MudPush II ~ 5 bpm / 420 psi, Drop btm plug and pump 179.6 bbl of 11.5 LiteCrete Lead cement, Follow Lead with 33.7 bbls of 15.8 ppg Class G Tail cement, Flush lines and drop top plug, Displaced cement with 408 bbls of mud with Rig Pumps, Reciprocated pipe in 10' strokes C~3 1 stroke/min until -5600 strokes of displacement Bump plug with 7164 strokes, Pressure up 500 psi over final circ. psi of 1000 psi to 1500 psi, Hold pressure for 5 minutes and bled off pressure and check floats Floats holding O.K. R/D cement lines and cement head, Back out Landing joint and UD Change out long bales Flush Stack and Flowline Function Test all rams Install 7" Packoff and test same to 5000 psi for 10 min, O.K. .Install test plug and change out 7" Rams to 3 1/2" x 6 Variables Test Rams to 250 psi low and 3500 psi high, 5 min /test Test witness by NAD TP Bill Bixby and BP WSL Brian Buzby Pull test plug and install wear bushing Perform 7" x 9 5/8" annular LOT -2848' tvd / 620 psi -EMW = 14.78 P/U Whipstock /milling BHA handling equip to rig floor P/ U 9joints of 4 3/4" DC's, -pump through to flush ~ 293 gpm / 220 psi -Pull out and stand back in derrick PJSM, M/U mills and lay down in pipe shed PJSM, R/U tubing tongs, - P/U 6 joints of 4 1/2" TCII tubing - R/D tubing handling equip. PJSM, M/U whipstock/anchorassernbly to 4.5 TCII tubing - M/U Milling BHA and scribe MWD to whipstock -RIH with 3 stands of 4 3/4" DC's Perform MWD Shallow hole test RIH to 2234 and Printed: 7/8/2007 6:54:22 AM • • BP Page 11 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To ! Hours ~ Task ~ Code I NPT Spud Date: 12/5/2006 Start: 12/4/2006 End: 1 /5/2007 Rig Release: 1 /5/2007 Rig Number: Phase , Description of Operations 12/19/2006 00:00 - 06:00 6.00 STWHIP P PROD1 Continue running in hole with whipstock and milling assembly from 2,234' to float collar with tail pipe at 10,590'. Filled pipe every 3,000'. PU - 220K, SO - 88k. 06:00 - 07:00 1.00 STW HIP P PROD1 Orient whipstock 15 deg. right of highside and set whipstock with top of window at 10,311'. Set anchor with 17k down weight. Pick up 10k over string weight to verify anchor set. Shear pin with 30k down weight. 07:00 - 08:00 1.00 STWHIP P PROD1 Pressure test casing to 3,500 psi, 30 minutes - No pressure loss. 08:00 - 09:00 1.00 STWHIP P PROD1 Pump a 50 bbl, 10% Steel Lube EP spacer. Displace well from 10.6 ppg LSND mud to 9.5 ppg FloPro mud at 292 gpm, 2,230 psi, PU - 190k, SO - 90k. Dumped spacer plus 20 bbls of contaminated FloPro mud when back to surface. 09:00 - 13:00 4.00 STWHIP P PROD1 Mill 12' window from 10,311' to 10,323'. 296 gpm, 2,360 psi, U 90 rpm, 5.3k TO off, 6k TO on, PU - 190k, SO - 90k, RWT - 127k, WOB - 2-3k. 13:00 - 14:00 1.00 STWHIP P PROD1 Drifl new hole with mill from 10,323' to 10,338'. 301 gpm, 2,360 psi, 87 rpm, 5.3k TO off, 6k TO on. 14:00 - 15:30 1.50 STWHIP P PROD1 Dress window while circulating a high vis, fiber sweep surface to surface. 303 gpm, 2,335 psi, 60 rpm, 5.3k TO. No drag or torque through window area. 15:30 - 16:00 0.50 STWHIP P PROD1 Perform FIT. MD - 10,323', TVD - 6,683', Test Pressure - 720 psi, MW - 9.5 ppg, EMW - 11.57 ppg. 16:00 - 22:00 6.00 STW HIP P PROD1 Monitor well - OK. Pump Safe Carb 250 dry job and POH from 10,311' to 365'. 22:00 - 22:30 0.50 STWHIP P PROD1 Lay down 9 ea 4 3/4" drill collars. 22:30 - 23:00 0.50 STW HIP P PROD1 Lay down remainder of milling BHA. Mills were full gauge. 23:00 - 23:30 0.50 STWHIP P PROD1 Clear and clean rig floor. 23:30 - 00:00 0.50 STWHIP P PROD1 Pull wear ring and flush BOP stack. 12/20/2006 00:00 - 00:30 0.50 BOPSU P PROD1 Rig up to test BOPE. 00:30 - 07:00 6.50 BOPSU P PROD1 PJSM. Pressure test BOPE to 250 psi low, 3,500 psi high for 5 minutes each test. Perform accumulator test. Witnessing of test waived by AOGCC rep Jeff Jones. Test witnessed by BP WSL R. French and NAD TP R. Hunt. Tested VBRs with 4", 4.5", 3.5" and 2 7/8" test joints. 'Note: Air actuated safety valve on topdrive failed. 07:00 - 07:30 0.50 BOPSU P PROD1 Pull test plug and install wear bushing. 07:30 - 10:00 2.50 BOPSU N SFAL PROD1 Back out and change out air actuated safety valve and saver sub on topdrive. Test same to 250 psi low, 3,500 psi high -OK. 10:00 - 10:30 0.50 BOPSU P PROD1 Inspect and service rotary master bushings and bushing locks. 10:30 - 12:00 1.50 DRILL P PROD1 PJSM. Pick up and make up BHA #6: 6.125" HTC bit, MX-18HDX, 2 deg PDM, bypass sub, MWD, 3 ea NM Flex DCs, Circ sub, X-over, 1 jt 4" DP, JAR. 12:00 - 13:00 1.00 DRILL P PROD1 Run in hole with BHA picking up drill pipe out of pipe shed from 225' to 1,107'. 13:00 - 13:30 0.50 DRILL P PROD1 Shallow hole test MWD. 296 gpm, 1,095 psi - OK. 13:30 - 17:00 3.50 DRILL P PROD1 Continue running in hole picking up drill pipe from 1,107' to 4,034'. 17:00 - 18:00 1.00 DRILL P PROD1 Fill pipe. Cut and slip drilling line 98'. 18:00 - 18:30 0.50 DRILL P PROD1 Service rig and topdrive. 18:30 - 21:00 2.50 DRILL P PROD1 Run in hole with pipe out of derrick from 4,034' to 10,124'. Filled pipe at 7,240'. Printed: 1/8/2007 6:54:22 AM • • gp Page 12 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date From- To Hours ~ Task Code NPT ~ Phase --- 12/20/2006 21:00 - 21:30 0.50 ~ DRILL P ~ PROD1 21:30 - 00:00 I 2.501 DRILL P I PROD1 12/21/2006 100:00 - 01:00 I 1.001 DRILL I P I I PROD1 01:00 - 04:00 I 3.001 DRILL I P I I PRODi 04:00 - 09:30 I 5.501 DRILL I P I I PROD1 09:30 - 10:30 1.00 DRILL P PROD1 10:30 - 11:00 0.50 DRILL P PROD1 11:00 - 12:30 1.50 DRILL P PROD1 12:30 - 14:00 1.50 DRILL P PROD1 14:00 - 14:30 0.50 DRILL P PROD1 14:30 - 18:00 3.50 DRILL P PROD1 18:00 - i 9:00 I 1.001 DRILL I P I I PROD1 19:00 - 00:00 I 5.001 DRILL I P I I PROD1 12/22/2006 100:00 - 12:00 I 12.00 I DRILL P ~ ~ PROD1 12:00 - 00:00 I 12.001 DRILL I P I I PROD1 12/23/2006 ~ 00:00 - 12:00 12.001 DRILL I P PROD1 Description of Operations Fill pipe and orient high side. PU - 167k, SO - 109k. Slide through window without pumps - no problem. Directionally drill 6.125" production hole from 10,338' to 10,462' building inclination with 22 deg / 100' average doglegs. 280 gpm, 2,180 psi off, 2,220 psi on, AST - 1.99 hrs. Directionally drill 6.125" production hole from 10,462' to 10,506' building inclination to 95 deg (estimated projection to bit) 280 gpm, 2,046 psi off, 2,106 psi on. Pump a 35 bbl, 2 Ib over, weighted sweep outside of bit and up into casing. Shut down and pull up to 10,300'. Drop and pump ball to open CCV at 2 bpm, 575 psi. Shear open with 2,350 psi, drop and pump BHA closing ball at 2 bpm, 430 psi. Close off BHA and circulate bottoms up at 500 gpm, 2,855 psi. Had appx. 10% increase in cuttings when sweep back to surface. Drop and pump ball to close CCV at 2 bpm, 360 psi. Seat and shift CCV closed with 3,500 psi. Establish circulation with 2 bpm, 500 psi. Monitor well - OK. 9.4 ppg MW, PU - 168k, SO - 107k. Pump dry job and POH for BHA from 10,300' to 225'. PJSM. Lay down BHA #6. Break out bit, lay down 2 deg motor. Clear and clean rig floor. PJSM. Make up 1.5 deg motor and HTC HCM406 PDC bit. Pick up, make up ADN. Load nuclear source. RIH with remainder of BHA #7 to 261' and shallow hole test MWD - OK. Run in hole with BHA #7 from 261' to 3,509'. Service rig and topdrive. Continue running in hole from 3,509' to 10,255'. Fill pipe and orient high side. Slide through window without pumping. PU - 170k, SO - 110k. Run in hole to 10,506'. Madpass log from 10,506' to 10,396' without rotating. 279 gpm, 1,880 psi. Run in hole to 10,506'. Directionally drill 6.125" production hole from 10,506' to --~ 10,765'. 275 gpm, 1,750 psi off, 1,960 psi on, PU - 165k, SO - 105k, WOB - 10k, AST - 3.86 hrs. Directionally drill 6.125" production hole from 10,765' to 11,593'. 294 gpm, 2,115 psi off, 2,250 psi on, 60 rpm, 7.5k TO off, 8k TO on, PU - 158k, SO - 94k, RWT - 124k, WOB - 5-15k, AST - 4.56 hrs, ART - 3.08 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Pumped a 30 bbl, '2 ppg over weighted sweep ~ 11,100'. 5% increase in cuttings were seen with sweep back to surface. Directionally drill 6.125" production hole from 11,593' to ~! 12,325'. 294 gpm, 2,265 psi off, 2,445 psi on, 60 rpm, 6.7k TO off, 8.2k TO on, PU - 158k, SO - 84k, RWT - 119k, WOB - 5-10k, AST - 4.58 hrs, ART - 2.27 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Directionally drill 6.125" production hole from 12,325' to 12,802'. 295 gpm, 2,275 psi off, 2,450 psi on, 60 rpm, 6.8k TO off, 7.3k TO on, PU - 155k, SO - 83k, RWT - 120k, WOB - 5-10k, AST - 4.16 hrs, ART - 3.04 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Pumped a 30 bbl, 2 ppg over weighted sweep ~ 12,359'. 5% Printed: 1/8/2007 6:54:22 AM • • BP Page 13 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 .Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 'Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date ,From - To ,Hours Task Cade I NPT I Phase 12/23/2006 00:00 - 12:00 12.00 DRILL P 12:00 - 00:00 12.00 DRILL P 12/24/2006 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 18:00 6.00 DRILL P 18:00 - 19:00 1.00 DRILL P 19:00 - 00:00 5.00 DRILL P 12/25/2006 ~ 00:00 - 05:00 05:00 - 07:00 07:00 - 13:30 13:30 - 15:00 15:00 - 16:30 16:30 - 19:00 19:00 - 20:30 5.00 I DRILL P 2.001 DRILL ~ P 6.50 DRILL P 1.50 DRILL P 1.50 DRILL P 2.50 DRILL P 1.50 DRILL N PROD1 PROD1 PROD1 PROD? PROD1 PROD1 PROD1 PRODi PROD1 PROD1 PROD1 PROD1 DPRB PROD? Description of Operations increase in cuttings were seen with sweep back to surface. Directionally drill 6.125" production hole from 12,802' to 13,400'. 294 gpm, 2,260 psi off, 2,635 psi on, 60 rpm, 6.4k TO off, 7.9k TO on, PU - 164k, SO - 84k, RWT - 118k, WOB - 5-10k, AST - 6.1 hrs, ART - 1.75 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Directionally drill 6.125" production hole from 13,400' to - 13,629'. 294 gpm, 2,268 psi off, 2,560 psi on, PU - 175k, SO - 87k, RWT - 120k, WOB - 5-10k, 60 rpm, 7.3k TO off, 8.4k TO on AST - 5.33 hrs, ART - .34 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Started partial mud losses ~ -13,446'. Initial dynamic losses 35-60 bph. Mixed 20 sacks MIX II MED over suction while pumping @ 13,450'. Mix and pump a 40 bbl, 40 ppb LCM pill surface to surface while drilling @ 13,472'. Loss rate slowed to 0-25 bph. Pill consisted of 12 ppb Mix II Med, 12 ppb Mix II Fine, 12 ppb SafeCarb 40, 4 ppb Nut Plug Coarse. Pumped second LCM pill C~1 13,567': 40 bbl, 50 ppb (40 ppb Mix II Med & 10 ppb Nut Plug Coarse. Lost total of 346 bbls of 9.5 ppg mud from midnight to noon. *Logs indicated fault (#4) C~? 13,486'. Directionally drill 6.125" production hole from 13,629' to 13,698'. 294 gpm, 2,340 psi off, 2,580 psi on, PU - 166k, SO - 83k, RWT - 115k WOB - 5-10k, 60 rpm, 7.3k TO off, 8.4k TO on, AST - 1.8 hrs, ART - .73 hrs. Survey every 30 ft, backream each stand at drilling rate, 75% on down stroke. Drilling suspended due to low BOP. Pump 40 bbl, 40 ppb (20 ppb Mix II Med, 10 ppb Safe Carb 40 & 10 ppb Nut Pfug Fine) LCM pill up into 7" casing. 294 gpm, 2,340 psi, 60 rpm, 7.2k TO. Trip for bit. Madpass log from 13,698' to 12,072' ~ 600 fph. 252 gpm, 2,025 psi, RWT - 84k. Lost total of 167 bbls of 9.5 ppg mud from noon to midnight. i Lost total of 513 bbls for the day. 513 bbls total loss to well. I, Continue Madpass logging from 12,072' to 10,495', 252 gpm, 1,750 psi, 60 rpm, 5.4k TO. Stopped rotation ~ 10,750'. Stopped pumping ~ 10,495' and pulled up into 7" casing to 10,255'. Drop CCV opening ball and pump down ~ 2 bpm 520 psi. Shear open valve with 3,450 psi and circulate bottoms up. 500 gpm, 2,550 psi, 70 rpm, 5.2k TO. Monitor well for 5 min -well static. Drop CCV closing ball and pump down ~ 2 bpm, 385 psi. Shift valve closed with 3,923 psi. Pump dry job. 9.5 ppg MW. POH from 10,255' to BHA ~ 261'. PU - 155k, SO - 105k. *Lost 57 bbls of 9.5 ppg FlowPro mud from midnight to noon. PJSM. Lay down BHA #7, bit, motor and MWD. Stablizer on AIM was worn down to body. Slip and cut drilling line 90 ft. Service topdrive, crown and blocks. Christmas safety standown and meal at W rangle Camp. PJSM. Pick up and make up BHA #8: 6.125" flat bottom mill, Printed: 7/8/2007 6:54:22 AM • BP Page 14 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 ..Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date 12/25/2006 From - To ;Hours Task ~ Code ~ NPT ~ Phase 19:00 - 20:30 1.50 DRILL N 20:30 - 00:00 3.50 DRILL N 12/26/2006 100:00 - 02:00 02:00 - 02:30 2.001 DRILL I N 0.50 I DRILL I N 02:30 - 07:30 5.00 DRILL N 07:30 - 08:00 0.50 DRILL N 08:00 - 08:30 0.50 DRILL N 08:30 - 09:00 0.50 DRILL N 09:00 - 10:30 1.50 DRILL N 10:30 - 15:00 I 4.501 DRILL I N 15:00 - 16:00 1.00 DRILL N 16:00 - 17:00 1.00 DRILL N 17:00 - 00:00 7.00 DRILL N 12/27/2006 100:00 - 06:30 06:30 - 07:00 07:00 - 08:30 6.50 DRILL N 0.50 DRILL N 1.50 DRILL N DPRB IPRODI DPRB IPRODI DPRB I PROD1 DPRB IPRODI DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRBIPRODI DPRB IPRODI DPRBIPRODI DPRBIPRODI Description of Operations 2 ea junk basketskets bd sub, float sub, 3 ea NM flex DCs, CCV, XO, 1 jt DP, JAR. Run in hole with mill assembly from 185' to 6,467'. *Lost 11 bbls 9.5 ppg FlowPro mud from noon to midnight. Lost total of 68 bbls for the day. 581 bbls total loss to well. Continue running in hole with mill assembly from 6,467' to 10,270'. Fill pipe and ease down to window Attempt to work through window to 10,314 tt 5 times by setting down 10-15k. PU - 177k, SO - 135k. Make up topdrive and obtain free RWT - 135k, 6.5k TO. Slack off to 10" above set down depth and rotate slowly to 7k TO without any indication of rolling off window. Pick up taking 20k over to pull free. Slack back off to 1-1/2' above set down depth and rotate slowly to 7k TO. Hold torque and slack off and set down 10k, release torque and set additional 10k. Jars went off, no weight change. Pick back up taking 25k over to pull free. Monitor well -static. 9.5 PP9 MW. POH for BHA from 10,314' to BHA. Stand back Jar and flex DCs. Lay down BHA #8, FB mill and junk baskets. No markings on mill, junk baskets empty. Clear and clean rig floor. Bring up window dressing BHA to rig floor. Make up BHA #9: 6.125" Gen 2 window mill, bit sub, 6.125" upper string mill, 2 ea 4 3/4" DCs, XO, 2 ea junk baskets, bit sub, float sub, 1 jt 4" dp, drilling Jar. Run in hole with BHA #9 on drill pipe from 145' to 10,311'. *Lost 8 bbls 9.5 ppg FlowPro mud from midnight to noon. Circulate bottoms up C~3 450 gpm, 3,040 psi. PU - 171 k, SO - 98k. Work mill through window from 10,311' to 10,331'. 3 ft of milling was hard. Dressed window then work through several times to confirm BHA entry OK. 343 gpm, 2,042 psi, 80 rpm, 6-7k TO. Mill and ream from 10,331' to 11,860'. Hard reaming from 10,331' to 11,278' ~ 350 gpm, 2,000 psi 70 rpm, 7-12k TO. Intermittent torque and drag from 11,278' to 11,860'. Reduce pump rate to 290 gpm, 1,640 psi to reduce loss rate of 35-40 bph. 70 rpm, 7-12k TO. "Lost 245 bbls of 9.5 ppg FlowPro mud from noon to midnight. Lost total of 253 bbls for the day. 834 bbls total loss to well. Continue reaming with milling assembly from 11,860' to TD ~ 13,698'. 290 gpm, 1,780 psi, 70 rpm, 8-12k TO. Intermittent torque and drag 5 or 6 times per stand. PU - 165k, SO - 100k, RWT - 120k. Attempt to drill several feet with mill. 290 gpm, 1,975 psi, 90 rpm, 7.2k TO off, 11.3k TO on, 10-15k WOB. Hard dril-ing - no footage and no indication of junk. Circulate bottoms up at 290 gpm, 1,990 psi, 80 rpm, 8.8k TO, PU - 165k, SO - 85k, RWT - 114k. Pump 40 bbl, 40 ppb LCM pill with 16 ppb Mix II Coarse, 12 ppb Nut Plug Fine, 12 ppb SafeCarb 40, surface to surface. 9.5 ppg MW. Printed: 1/8/2007 6:54:22 AM BP Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To . Hours ~ Task ~ Code ~ NPT 12/27/2006 108:30 - 12:00 I 3.501 DRILL I N 12:00 - 16:00 4.00 I DRILL ~ N 16:00 - 17:00 I 1.00 I DRILL ( N 17:00 - 17:30 1 0.501 DRILL N 17:30 - 18:30 J 1.00 DRILL N 18:30 - 23:00 I 4.501 DRILL I N 23:00 - 00:00 I 1.001 DRILL I N 12/28/2006010:00 - 04:30 ~ 3.501 DRILL N 04:30 - 05:00 0.50 DRILL N 05:00 - 12:00 7.00 DRILL P 12:00 - 15:00 I 3.001 DRILL I P 15:00 - 16:00 I 1.001 STKOH I C 16:00 - 17:30 1.501 STKOH C 17:30 - 00:00 I 6.501 STKOH I C 12/29/2006 00:00 - 02:30 2.50 ~ STKOH C 02:30 - 08:30 6.00 DRILL C Start: 12/4/2006 Rig Release: 1/5/2007 Rig Number: Phase DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PRODt DPRB PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 15 of 21 Spud Date: 12/5/2006 End: 1 /5/2007 Description of Operations Monitor well -static. PU - 185k, SO - 100k. POH from 13,698' to 10,331'. Pulled 25k over ~ 12,380'. Slacked back down, came up OK. Rest of trip OK. *Lost 167 bbls of 9.5 ppg FlowPro mud from midnight to noon. Pull milling assembly through window with slight overpull. Go back through window without problem and then came back up with same slight overpull. Monitor welt - OK. Continue POH from window to milling BHA. Lay down steel DCs and milling assembly. Pilot mill was 1/8" out of gauge, smooth wear with no junk markings. Upper mill was full gauged. Junk baskets were empty. Clear and clean rig floor. PJSM. Pick up and make up directional drilling assembly, BHA #10: 6.125" HTC HCM505Z used bit, 1.5 deg PDM AIM, bypass sub, NM STAB, MWD, ADN, 3 ea NM Flex DCs, CCV, XO, 1 jt 4" DP, JAR. Run in hole with BHA #10 on drill pipe from 262' to 10,256`. PU - 168k, SO - 109k. Shallow hole tested MWD ~ 1,298'. 294 gpm, 1,200 psi. Cut and slip 92 ft of drilling line. *Lost 5 bbls of 9.5 ppg FlowPro mud from noon to midnight. Lost total of 221 bbls for the day. 1051 bbls total loss to well. Finish cut and slip, service topdrive, blocks and crown. Run in hole from 10,256' to window. Orient high side and go through window without problem, PU - 150k, SO - 90k. Continue running in hole to 13,603' without problem. Precautionary wash to bottom - no fill. Circulate 2 open hole volumes ~ 275 gpm, 2,400 psi. Directionally drill from 13,698' to 13,775', 275 gpm, 2,345 psi off, 2,400 psi on, 60 rpm, 7.3k TO off, 9k TO on, PU - 150k, SO - 95k, AST - 3.26 hrs, ART - .38 hrs. Backream 90 ft prior to connections ~ drilling rate, 75% drilling rate on down stroke. *Lost 124 bbls 9.4 ppg FlowProw mud from midnight to noon. Directionally drill from 13,775' to 13,819', 294 gpm, 2,355 psi off, 2,565 psi on, PU - 150k, SO - 95k, AST - 2.8 hrs, ART - 0.00 hrs. Backream 90 ft prior to connections ~ drilling rate, 75% drilling rate on down stroke. *Went into the Kalubik* Backream for openhole sidetrack from 13,819' to 13,490', 294 gpm, 2,540 psi, 70 rpm, 8.4k TO, RWT - 123k. Orient lowside and trench hole from 13,460' to 13,490', TVD 6,711'. 294 gpm, 2,340 psi, PU - 168k, SO - 89k, AST - 1.11 hrs. Sidetrack #2. Time drill from 13,490' to 13,500'. 1st 8 ft ~ 2 fph. 294 gpm, 2,300 psi, 60 rpm, 8.5k TO, RWT - 123k. *Lost 65 bbls of 9.4 ppg FlowProw mud from noon to midnight. Lost total of 189 bbls for the day. 1240 bbls total loss to well. Continue time drilling from 13,500' to 13,508'. 285 gpm, 2,270 psi off, 2,295 psi on, 60 rpm, 7.8k TO off, 9k TO on. Directionally drill from 13,508' to 13,819', 285 gpm, 2,290 psi off, 2,500. psi on, 60 rpm, 8.3k TO off, 9.1 k TO on, PU - 160k, SO - 90k, RWT - 123k. Survey every 30'. Backream 90 ft prior Printed: 1/8/2007 6:54:22 AM BP Page 16 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date !From - To Hours ~ Task ~ Code NPT Phase 12/29!2006 102:30 - 08:30 6.00 DRILL C 08:30 - 12:00 I 3.501 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 12/30/2006 100:00-03:30 03:30 - 04:00 04:00 - 07:00 07:00 - 08:30 08:30 - 09:00 09:00 - 11:30 11:30 - 12:30 3.501 DRILL I P 0.50 DRILL P 3.00 DRILL P 1.50 DRILL P 0.50 DRILL P 2.50 DRILL P 1.00 DRILL P PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PRODi PROD1 PROD1 PROD1 12:30 - 18:00 5.50 DRILL P PROD1 18:00 - 20:00 2.00 DRILL P PROD1 20:00 - 20:30 0.50 DRILL P PROD1 20:30 - 21:30 1.00 CASE P RUNPRD 21:30 - 00:00 2.50 CASE P RUNPRD Description of Operations to connections ~ drilling rate, 75% drilling rate on down stroke. Pumped 2 ea, 25 bbl, 40 ppb LCM pill surface to surface. One ~ 13,548' and one C~3 13,588'. Loss rate was @ 60 bph initially, then dropped back down to 20 bph after pills returned to surface. Directionally drill from 13,819' to 13,940', 285 gpm, 2,290 psi off, 2,500 psi on, 60 rpm, 8.3k TO off, 9.1 k TO on, PU - 165k, SO - 85k, RWT - 122k, AST - 5.13 hrs, ART - 1.3 hrs. Survey every 30'. Backream 90 ft prior to connections @ drilling rate, 75% drilling rate on down stroke. Pumped 40 bbl, 40 ppb LCM pill C~ 13,840'. *Lost 386 bbls of 9.5 ppg FlowPro mud from midnight to noon Directionally drill from 13,940' to 14,222', 275 gpm, 2,155 psi off, 2,300 psi on, 60 rpm, 8.4k TO off, 8.8k TO on, PU - 173k, SO - 75k, RWT - 121 k, AST - 3.94 hrs, ART - 3.08 hrs. Survey every 30'. Backream 90 ft prior to connections @ drilling rate, 75% drilling rate on down stroke. Pumped 25 bbl, 5 ppb Magma Fiber LCM pill ~ 14,010'. *Lost 314 bbls of 9.5 ppg FlowPro mud from noon to midnight. Lost total of 700 bbls for the day. 1,940 bbls total loss to well. Directionally drill from 14,222' to TD Q 14,437' MD, 6724' TVD. 275 gpm, 2,260 psi off, 2,560 psi on, 60 rpm, 8.2k TO off, 9.5k TO on, PU - 170k, SO - 75k, RWT - 122k, WOB 10-15k, AST - 0.54 hrs, ART - 1.92 hrs. Survey every 30'. Backream 90 ft prior to connections ~ drilling rate, 75% drilling rate on down stroke. Pumped 25 bbl, 5 ppb Magma Fiber LCM piA @ 14,350'. Circulate cuttings into casing. 275 gpm, 2,260 psi, 60 rpm, 8.1 k TO. MadPass new hole from 14,437' to 13,507' C~J 600 fph. 280 gpm, 2,260 psi, 60 rpm, 8.1 k TO. *Loss rate ~ 18-24 bph. Pump a 30 bbl, 30 sacks Mix II Med LCM pill, surface to surface while working ADN stabilizer from 13,460' to 13,530'. 285 gpm, 2,300 psi, 60 rpm, 8.2k TO. 10% increase in cutting with pill back to surface. Mad Pass from 13,507' to 13,405'. Wipe openhole sidetrack from 13,405' to 13,599' without problem. Take survey to verify being in sidetrack. POH from 13,599' to 10,254' without problem. PU - 180k, SO - 90k. *Lost 200 bbls of Circulate bottoms up @ 300 gpm, 2,215 psi, 60 rpm, 5.2k TO, PU - 163k, SO - 81 k, RWT - 127k, MW - 9.5 ppg. Pump salt dry job. POH from 10,254' to BHA. PJSM. Lay down all BHA #10. Clear and clean rig floor. Rig up to run 4.5" production liner. PJSM. Pick up and Baker Lok 4.5" shoe track. Check floats - OK. Continue running in hole with 4.5" 12.6#, L-80 IBT-M production liner to 917' filling every joint. Made up connections Printed: 1/8/2007 6:54:22 AM g p Page 17 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ ~ Hours ' Task Code ~ NPT ~, Phase 12/30/2006 - _ _- _- 21:30 - 00:00 2.50 CASE P RUNPRD 12/31/2006 00:00 - 04:00 4.00 CASE P RUNPRD 04:00 - 05:00 I 1.00 CASE I P I RUNPRD 05:00 -05:30 I 0.501 CASE I P I I RUNPRD 05:30 - 09:30 ~ 4.00 (CASE ~ P I ~ RUNPRD 09:30 - 10:00 I 0.501 CASE I P I I RUNPRD 10:00 - 13:30 I 3.501 CASE P I RUNPRD 13:30 - 14:00 I 0.501 CASE I P I RUNPRD 14:00 - 16:00 I 2.001 CEMT I P I RUNPRD 16:00 - 18:00 I 2.001 CEMT I P I I RUNPRD Description of Operations Yo 4,200 ft/Ibs TO, using Best-O-Life 2000 NM pipe lubricant. 'Lost 140 bbls of 9.5 ppg FlowPro mud from noon to midnight. Lost total of 340 bbls for the day. 2280 bbls total loss to well. Continue running in hole with 4.5" 12.6# L-80 IBT-M production liner from 917' to 4,264' filling every joint. Ran total of 101 joints with 3 ea 20' 4.5" 12.6# L-80 IBT-M Markerjoints with RA tags installed in collars. Ran 99 4-5/8" x 5-3/4" straight bladed centralizers on all joints but #'s 99 & 100. All free floating except shoe joint -locked 5 tt above shoe. Make up Baker 5" X 7" HMC Liner hanger and 5" X 7" HRD ZXP Packer with 11.77' X 5.25" ID Tieback sleeve. Apply sealant on top of HR running toot and let it set up. Pick up 1 stand of drill pipe and run in hole to 4,402'. Circulate 1 liner volume C~ 20 gpm, 350 psi. PU - 75k, SO - 60k. Run in hole with 4.5" liner on drill pipe from 4,402' to 10,217' filling every 10 stands. Make up cement head to 15' drill pipe pup joint and lay down same. Circulate drill pipe and liner volume ~ 206 gpm, 720 psi. PU - 147k, SO - 99k. 30 spm - 310 psi -both pumps . 40 spm - 360 psi -both pumps. Run in hole from 10,217' to 14,396' without problem, filling pipe every 10 stands. `Lost 123 bbls of 9.5 ppg FlowPro mud from midnight to noon. Pick up and make up single joint of drill pipe and cement head with 15 ff pup joint. Make up cementing lines. Break circulation ~ 3 bpm, 710 psi. Run in hole and tag bottom C~3 14,437'. Stage pumps up to 5 bpm, 1,225 psi and circulate and reciprocate pipe in 15 tt strokes for cement job. PU - 175k, SO - 100k. PJSM with Dowell while circulating. Switch over to Dowell. Pump 5 bbls water, shut down. Pressure test lines to 4,100 psi - OK. Pump 30 bbls of 12 ppg MudPush II Spacer ~ 5 bpm, 1,040 psi ICP, 870 psi, FCP. Pump 113 bbls, 539 sacks of 15.8 ppg Class "G" Premium Cement ~ 5 bpm, 785 psi ICP, 240 psi FCP. Shut down and clean out cement lines. Drop drill pipe wiper dart. Switch over to rig. Displace cement with 64 bbls 9.5 ppg pert pill, followed by 99 bbls 9.5 ppg mud for total of 163 bbls of displacement. Pumped ~ 5 bpm, 115 psi until mud caught cement, then 800 psi ICP. Slowed to 2 bpm for liner plug latch-up then continued ~ 4.7 bpm, 1,685 psi FCP. Slow back down to 2 bpm, 1,135 psi ICP, 14 bbls prior to bumping plug, 1,310 psi FCP. Noted 3 bbl loss after cement turned corner around shoe until plug was bumped. Bump plug ~ calculated strokes with 95.3% pump efficiency. CIP C 17:48 hr. Plug initially bumped with 2,150 psi. Increase pressure per Baker rep to 3,500 psi to set liner hanger. Set down 60k. Bleed off pressure and check floats - OK. Pick up to 200k, HR tool had not released from liner. Slack back off to 35k, pressure back up to 4,200 psi, bleed pressure to zero. Pick up pipe, liner was released. Continue to pick up to expose dogs. PU - 160k, SO - 110k. Rotate down Printed: 1/8/2007 6:54:22 AM gp Page 18 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Hours I Task 'Code NPT _Date From - To ~ _- -- --- 12/31/2006 ~ 16:00 - 18:00 ~ 2.00 (CEMT ~ P Start: 12/4/2006 Rig Release: 1/5/2007 Rig Number: Phase RUNPRD 18:00 - 18:30 0.501 CEMT I P I RUNPRD 18:30 - 20:00 I 1.501 CEMT I P I I RUNPRD 20:00 - 21:00 I 1.001 CEMT I P I I RUNPRD 21:00 - 23:00 2.00 CEMT P RUNPRD 23:00 - 00:00 1.00 CEMT P RUNPRD 1/1/2007 00:00 - 00:30 0.50 CEMT P RUNPRD 00:30 - 04:00 3.50 CEMT P RUNPRD 04:00 - 04:30 0.50 CEMT P RUNPRD 04:30 - 07:00 2.50 EVAL P OTHCMP 07:00 - 12:00 5.00 EVAL P OTHCMP 12:00 - 13:00 1.00 EVAL P OTHCMP 13:00 - 14:00 1.00 EVAL P OTHCMP 14:00 - 14:30 0.50 PERFOB~ P OTHCMP 14:30 - 22:30 8.00 PERFO P OTHCMP 22:30 - 00:00 I 1.501 PERFOBI P ( I OTHCMP 1/2/2007 100:00 - 04:00 I 4.001 PERFOBI P I I OTHCMP 04:00 - 05:00 ~ 1.00 PERFOBI P I I OTHCMP Spud Date: 12/5/2006 End: 1 /5/2007 Description of Operations with 5,600 ft/Ibs TO and set 50k down with good indication of shear. Pick back up, set back down with 100k. Apply 1,000 psi to inside of string, pick up and note pressure loss. Continue picking up while staging pumps up to 300 gpm. Picked up until running tool was above liner top. Circulate out cement while reciprocating pipe 5 ft strokes. ~ 350 gpm, 2,100 psi. Returned 20 bbls of good cement back to surface. Lay down single and cementing head. Make up topdrive and displace well with 9.5 ppg brine while reciprocating pipe a full stand. 310 gpm 1,250 psi. Monitor well - OK. POH 2 stands to 9,900'. PU - 160k, SO - 110k. Break down cementing head and lay down same. POH from 9,900' to 6,389' standing back drill pipe in derrick. Lay down 24 joints of HWDP to 5,654'. 'lost 121 bbls of 9.5 ppg FlowPro mud from noon to 18:00 hr. Lost total of 244 bbls for the day. Lost total of 269 bbls for liner run, circulating and cementing. 2,588 bbls total loss to well. Continue POH standing back drill pipe from 5,654' to 3,620'. Lay down remaining drill pipe from 3,620' to running tool. Break and lay down running tool. Dogs were sheared. Clear and clean rig floor. PJSM. Rig up SLB wireline for USIT log. Function test tools - OK. USIT log 7" casing from 10,100' to 100'. Rig down SLB wireline. Pressure test liner, liner top packer, and 7" casing to 3,500 psi - 30 minutes -good test. Rig up for DPC run. Run in hole picking up 2.5" PJOmega 2506, 6 SPF pert guns and blanks, 2.875" PJOmega 2906 SPF perf guns and blanks. Pick up 2.875" PSC drill pipe as needed for space out (30 jts.). Total loaded guns - 2.345 ft. Total blank guns - 1,304.58 ft. Total gun length - 3,649.58 ft. Run in hole with pert assembly on drill pipe from 4,281' to 6,550'. Continue running in hole with DPC pert assembly on drill pipe from 6,550' to PBTMD ~ 14,349'. Pick up to set guns on depth for bottom shot ~ 14,335' and top shot @ 10,710'. Make up top drive, break circulation and get air out of surface lines. PU - 170k, SO - 99k. Close annulus and pressure up to 2,300 psi and hold 2 minutes. Bleed off pressure and monitor shot detection equipment. Shot detection equipment failed. Firing of guns was physically felt by TP & WSL by holding drill pipe. On 1st firing no fluid loss observed. 2nd firing went off 2 minutes later and a loss of 2 bbls was observed. Lossed 5 bbls in 15 minutes. Perf Intervals from top to bottom: 2,345 ft, 13,401 shots total. 2.875" PJOmega 2906 6SPF: 1,770 ft, 10,117 shots 10,710' to 10,800' - 90 ft, 515 shots Printed: 1/6/2007 6:54:22 AM g p Page 19 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date i From - To Hours , Task ~ Code ~ NPT ( Phase ~ Description of Operations 1/2/2007 04:00 - 05:00 1.00 PERFO P OTHCMP 10,860' to 10,970' - 110 ft, 627 shots 11,050' to 11,150' - 100 ft, 578 shots 11,210' to 11,410' - 200 ft, 1,139 shots 11,470' to 11,730' - 260 ft, 1,486 shots 11,790' to 12,020' - 230 ft, 1,310 shots 12,080' to 12,350' - 270 ft, 1,541 shots 12,650' to 13,000' - 350 ft, 1,998 shots 13,080' to 13,200' - 120 ft, 690 shots 13,270' to 13,310' - 40 ft 233 shots 2.5" PJOmega 2506 6SPF: 575 ft, 3,284 shots 13,650' to 13,900' - 250 ft, 1,423 shots 13,960' to 14,120' - 160 ft, 914 shots 14,170' to 14,335' - 165 ft, 947 shots 05:00 - 07:00 2.00 PERFO P OTHCMP POH to 10,649' standing back drill pipe to get above top perforation. PU - 170k, SO - 99k, 9.5 ppg brine. Lost 15 bbls while pulling out. 07:00 - 08:00 1.00 PERFO P OTHCMP Circulate surface to surface ~ 208 gpm, 740 psi. No gas detected on bottoms up. Lost 15 bbls while circulating. 08:00 - 08:30 0.50 PERFO P OTHCMP Service topdrive, crown and blocks. 08:30 - 09:00 0.50 PERFO P OTHCMP Trouble shoot drawworks blower system. 09:00 - 15:30 6.50 PERFO P OTHCMP Pump dry job, blowdown topdrive and POH laying down drill pipe from 10,069' to PAC drill pipe ~ 4,285'. *Lost 54 bbls 9.5 ppg brine from midnight to noon. 15:30 - 17:00 1.50 PERFO P OTHCMP Run in hole with 39 stands of drill pipe out of derrick from 4,285' to 7,929'. 17:00 - 21:00 4.00 PERFO P OTHCMP POH laying down drill pipe from 7,929' to PAC drill pipe ~ 4,285'. 21:00 - 22:00 1.00 PERFO P OTHCMP Rig up 2 7/8" equipment and lay down 2 7/8" PAC drill pipe from 4,285' to 3,665'. 22:00 - 00:00 2.00 PERFO P OTHCMP PJSM. Lay down pert guns from 3,665' to 3,000'. *Lost 22 bbts of 9.5 ppg brine from noon to midnight. 76 bbls total for the day. 1/3/2007 00:00 - 11:00 11.00 PERFO P OTHCMP Continue POH laying down pert gun assembly from 3,000' to surface. All guns fired. 11:00 - 12:00 1.00 PERFO P OTHCMP Clear and clean rig floor. Lay down vendor tools. *Lost 43 bbls of 9.5 ppg brine from midnight to noon. 12:00 - 13:00 1.00 PERFO P OTHCMP Cut and slip drilling line 98 ft. Service drawworks. 13:00 - 15:30 2.50 BUNCO RUNCMP PJSM. Pull wear bushing. Make dummy run with landing joint and tubing hanger. Function ROPE. Rig up to run completion. Rig up HES I-wire. 15:30 - 00:00 8.50 BUNCO RUNCMP PJSM. Run in hole with 3.5" 9.3# 13CR-80 Vam Top completion to 2,117' as per running detail. Baker Lok all connections below Baker S-3 Production packer. Torque tum connections to 2,900 fUlbs using Jet Lube Seal Guard lubricant. Connect I-Wire to HES "Symphony Plus" Gauge Carrier and run through 3.5" Cannon clamps on every joint. *Lost 20 bbls of 9.5 ppg brine from noon to midnight. 1/4/2007 00:00 - 13:00 13.00 BUNCO RUNCMP Continue running in hole with 3.5" 9.3# 13Cr-80 completion string from 2,117' to 6,632'. for total of 211 joints of 3.5" tubing.. *Lost 19 bbls of 9.5 ppg brine from midnight to noon. Printed: 1/8/2007 6:54:22 AM a • gp Page 20 of 21 Operations Summary Report Legal Well Name: V-122 Common Well Name: V-122 Spud Date: 12/5/2006 Event Name: DRILL+COMPLETE Start: 12/4/2006 End: 1/5/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/5/2007 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours i Task 1/4/2007 (13:00 - 21:30 I 8.50 ~ RUNC( Code ~ NPT ~ Phase Description of Operations 21:30 - 22:30 I 1.00 22:30 - 23:30 1.00 23:30 - 00:00 0.50 1 /5/2007 100:00 - 02:30 I 2.50 RUNCMP Rig up 4.5" chrome tubing running equipment. Run 4.5"12.6# 13Cr-80 Vam Top tubing in hole from 6,632' to XO bushing in 4.5" liner top assembly ~ 10,174'. Torque turned connections to 4,440 ft/Ibs using Jet Lube Seal Guard lubricant. RUNCMP Space out completion. Lay down 3 joints of tubing. Make up 3 spaceout pup joints. Pick up 1 joint of tubing. Install blast rings on tubing hanger and make up landing joint. Spaced out for 8 3/4 ft inside of 4.5" liner top. Ran total of 75 joints of 4.5" tubing. RUNCMP Run I-Wire through tubing hanger and terminate. Test to 5,000 psi - 10 min - OK. RUNCMP Land tubing. PU - 115k, SO - 78k (incl 30k blocks) Run in lock down screws on tubing head. Bot of WLEG - 10,153' Tops: X Nipple - 10,131' X Nipple w/ RHC-M Plug - 10,110' Baker S-3 production packer - 10,085' 1 jt 3.5" tubing "XD" DURO Sliding Sleeve - 10,028' "Symphony Plus" Gauge Carrier - 10,008' X Nipple - 9,987' 1 jt 3.5" tubing Dummy GLM - 9,926' 49 jts 3.5" tubing Dummy GLM - 8,358' MD 47 jts 3.5" tubing Dummy GLM - 6,851' MD 36 jts 3.5" tubing Dummy GLM - 5,692' MD 35 jts 3.5" tubing GLM w/ DCR-1 Shear Valve & RKP Latch - 4,563' MD 41 jts 3.5" tubing Dummy GLM - 3,246' MD 1 jt 3.5" tubing XO to 4.5" 15 jts 4.5" tubing X Nipple - 2,569' MD 59 jts 4.5" tubing 3 Space out pup jts 1 jt 4.5" tubing Hanger pup jt with blast rings Tubing hanger with 4.5" TCII lifting threads Ran total of 217ea 3.5" I-Wire full clamps Ran total of 14ea 3.5" I-Wire half clamps Ran total of 75ea 4.5" I-Wire full clamps Ran total of tea 4.5" I-Wire half clamps 'Lost 21 bbls of 9.5 ppg brine from noon to midnight. RUNCMP Rig up circulating lines. Reverse circulate 125 bbls of clean 9.5 ppg brine followed by 117 bbls of inhibited 9.5 brine, followed Printed: 1/8/2007 6:54:22 AM ~ ~ gP Page 21 of 21 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date i From - To 1 /5/2007 00:00 - 02:30 02:30 - 04:30 V-122 V-122 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABORS9ES Hours ~ Task ~ Code NPT ~, 2.50 2.00 04:30 - 05:00 0.50 BUNCO 05:00 - 08:30 3.50 BOPSU P 08:30 - 12:30 4.00 WHSUR P 12:30 - 13:30 1.00 WHSUR P 13:30 - 14:00 0.50 WHSUR P 14:00 - 15:00 1.00 WHSUR P 15:00 - 16:00 1.00 WHSUR P 16:00 - 17:30 1.50 WHSUR P 17:30 - 18:00 0.50 WHSUR P 18:00 - 20:00 2.00 WHSUR P Start: 12/4/2006 Rig Release: 1/5/2007 Rig Number: Phase RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP Spud Date: 12/5/2006 End: 1 /5/2007 Description of Operations by 125 bbls of clean 9.5 ppg brine to spot clean brine between the GLM #5 with shear valve and the packer. 3 bpm, 460 psi. Drop 1-5/16" ball and roller stem rod assembly with 1.375" fishing neck and let it fall to XN below the packer. Pulled out and layed down landing joint. Close blind rams and pressure up tubing to 4,200 psi to set packer. Hold pressure for tubing test for 30 min - 0 pressure loss. Bleed off pressure down to 2,500 psi. Pressure up annulus to 3,500 psi and hold for 30 min - 0 pressure loss. Bleed off annulus pressure to 0, then tubing pressure to 0. Pressure back up on annulus to shear DCR valve in #5 GLM station. Sheared at 2,300 psi. Pump several barrels each way through valve to confirm pumpability at 2 bpm, OA - 200 psi, IA - 165 psi. Drain BOP stack. Install 2-Way Check in tubing hanger with T-bar. Test TWC from below with 1,000 psi - OK. PJSM. Nipple down BOPE. Nipple up tree adaptor flange. Test same to 5,000 psi - 15 min - OK. Move production tree from back of cellar. Set tree on adaptor flange. Re-orient master and LEO valves. Nipple up tree. Rig up to test. Test production tree to 5,000 psi using diesel. - OK. Complete termination of HES I-Wire. Pull 2-Way Check valve with lubricator. Rig up circulating lines to tree. PJSM with LRHOS. Pressure test lines to 3,000 psi - OK. Reverse in 90 bbls of 70 deg heated diesel down tubing annulus ~ 500 psi ICP, 880 psi FCP. Pumped last 5 bbls @ 5 bpm, 1,400 psi. U-tube diesel back to tubing. 2,600' MD, 2,200' TVD. Install BPV with T-bar and test same to 1,000 psi from below - OK. Install VR plugs in IA. Install gauges on tree. Secure well and clean out cellar. Release rig from V-122 operations at 20:00 hr, 1/5/2007 for rig move to V-217i. (same pad, same row) Printed: 1/8/2007 6:54:22 AM b y t ~~~ ~~. ,~, ~e~ cc.~~~il~ /iii ~ 4 -122 Survey g Report Report Date: 30-Dec-O6 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 156.530° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: V-Pad /Plan V-122 (S-U) ND Reference Datum: Rotary Table Well: V-122 ND Reference Elevation: 82.85 it relative to MSL Borehole: V-122 Sea Bed /Ground Level Elevation: 55.15 t1 relative to MSL UWI/API#: 500292332800 Magnetic Declination: 23.833° Survey Name /Date: V-122 /December 30, 2006 Total Field Strength: 57630.911 nT Tort /AHD / DDI / ERD ratio: 475.356° / 11395.69 ft / 7.064 / 1.693 Magnetic Dip: 80.885° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 28, 2006 Location LaULong: N 70.32766191, W 149.26397215 Magnetic Declination Model: BGGM 2006 Location Grid NIE Y/X: N 5969960.760 ftUS, E 590756.020 ftUS North Reference: True North Grid Convergence Angle: +0.69307258° Total Corr Mag North -a True North: +23.833° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft ft tt ft de 100 tt ftUS ftUS Hlt U.UU U.UU U.UU -tSZ.tSb U.UU U.UU U.UU U.UU U.VU U.UU U.VU bybyybV./b DyV/Sb.UZ IV /U.3Z/bblyl VV 14`J.Lb3`J/ZIJ First GYD GC SS 100.00 0.32 36.37 17.15 100.00 -0.14 0.28 0.28 0.22 0.17 0.32 5969960.99 590756.18 N 70.32766253 W 149.26397081 173.00 0.29 26.16 90.15 173.00 -0.36 0.67 0.67 0.55 0.37 0.08 5969961.32 590756.38 N 70.32766343 W 149.26396917 266.00 0.72 75.06 183.14 265.99 -0.43 1.45 1.38 0.92 1.04 0.62 5969961.69 590757.05 N 70.32766442 W 149.26396375 360.00 1.75 66.17 277.12 359.97 -0.35 3.47 3.35 1.65 2.92 1.11 5969962.44 590758.92 N 70.32766642 W 149.26394847 447.00 3.46 12.36 364.04 446.89 -2.49 7.17 6.68 4.75 4.70 3.23 5969965.57 590760.66 N 70.32767489 W 149.26393406 540.00 4.84 2.62 456.79 539.64 -8.29 13.88 12.66 11.41 5.48 1.66 5969972.24 590761.36 N 70.32769309 W 149.26392773 630.00 6.98 13.67 546.31 629.16 -16.06 23.12 21.66 20.52 6.94 2.68 5969981.36 590762.71 N 70.32771797 W 149.26391584 723.00 7.84 42.75 638.57 721.42 -23.12 34.86 33.15 30.67 12.59 4.09 5969991.58 590768.23 N 70.32774570 W 149.26387008 Last GYD GC SS 814.00 9.52 59.81 728.54 811.39 -26.51 48.50 45.45 39.02 23.31 3.36 5970000.05 590778.85 N 70.32776850 W 149.26378315 First MWD+IFR+MS 851.12 10.87 63.04 765.07 847.92 -27.08 55.06 51.21 42.15 29.08 3.95 5970003.25 590784.59 N 70.32777705 W 149.26 943.72 12.86 65.33 855.69 938.54 -27.83 74.10 68.40 50.41 46.23 2.21 5970011.72 590801.63 3 N 70.32779962 W 149.263. 1039.70 16.70 65.96 948.48 1031.33 -28.19 98.58 91.41 60.49 68.54 4.00 5970022.07 590823.81 N 70.32782716 W 149.2634 1135.17 20.86 65.69 1038.84 1121.69 -28.57 129.31 121.10 73.08 96.57 4.36 5970034.99 590851.69 N 70.32786155 W 149.26318907 1229.99 24.24 65.16 1126.40 1209.25 -29.28 165.67 156.79 88.21 129.63 3.57 5970050.52 590884.56 N 70.32790289 W 149.26292100 1325.37 27.08 66.48 1212.37 1295.22 -29.77 206.96 197.58 105.10 167.31 3.04 5970067.87 590922.03 N 70.32794903 W 14926261543 1421.67 29.33 67.94 1297.23 1380.08 -29.21 252.47 242.60 122.71 209.27 2.44 5970085.98 590963.77 N 70.32799714 W 149.26227514 1517.40 32.30 73.70 1379.45 1462.30 -25.44 301.48 290.78 138.70 255.57 4.37 5970102.53 591009.87 N 70.32804082 W 149.26189969 1613.89 35.33 75.23 1459.61 1542.46 -18.00 355.17 343.31 153.05 307.31 3.26 5970117.50 591061.42 N 70,32808002 W 149.26148017 1707.50 39.74 79.42 1533.84 1616.69 -7.22 412.17 398.86 165.46 362.93 5.44 5970130.58 591116.89 N 70.32811390 W 149.26102911 1802.51 41.22 79.01 1606.10 1688.95 6.32 473.84 459.01 177.00 423.52 1.58 5970142.85 591177.32 N 70.32814543 W 149.26053780 1900.86 43.47 76.05 1678.80 1761.65 18.92 540.08 524.33 191.34 488.17 3.06 5970157.97 591241.80 N 70.32818458 W 149.26001347 1996.78 45.35 72.41 1747.32 1830.17 27.87 607.19 591.14 209.61 552.74 3.30 5970177.02 591306.13 N 70.32823448 W 149.25948991 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122\V-122 Generated 1/18/2007 1:24 PM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft n n ft ft ft ft de 00 ft ftUS ftUS 1091.44 47.10 67.15 1811 .133 1895. 88 31. 70 675 .51 Ei59.44 133 .18 61(1.81 4.41 59/0101 .44 5913139.91 N /0.31819908 W 149.1589/019 2187.31 49. 42 61 .79 1876 .68 1959. 53 29. 07 747 .02 730 .69 264 .12 681. 29 4.82 5970233 .07 591434. 00 N 70. 32838337 W 149.25844742 2283.52 52. 72 57 .84 1937 .14 2019. 99 20. 26 821 .84 804 .65 301 .78 745. 92 4.69 5970271 .51 591498. 17 N 70. 32848625 W 149.25792327 2378.40 52. 42 57 .56 1994 .81 2077. 66 8. 70 897 .19 878 .89 342 .04 809. 61 0.39 5970312 .54 591561. 35 N 70. 32859622 W 149.25740679 2474.64 51. 15 54 .26 2054. 36 2137. 21 -5. 22 972 .79 953 .17 384 .40 872. 22 3.00 5970355 .64 591623. 45 N 70. 32871191 W 149.25689898 2569.81 50. 60 54 .69 2114 .41 2197. 26 -20. 64 1046 .62 1025 .56 427 .30 932. 31 0.68 5970399 .26 591683. 00 N 70. 32882909 W 149.25641167 2665.17 52. 12 52. 59 2173. 96 2256. 81 -37. 26 1121 .10 1098 .58 471 .46 992. 27 2.34 5970444 .14 591742. 43 N 70. 32894972 W 149.25592533 2761.41 52. 25 52. 49 2232. 96 2315. 81 -55. 64 1197 .13 1173 .04 517 .70 1052. 62 0.16 5970491 .11 591802. 21 N 70. 32907603 W 149.25543587 2857.23 52. 00 52 .65 2291. 79 2374. 64 -73. 89 1272 .76 1247 .32 563 .67 1112. 69 029 5970537 .80 591861. 70 N 70. 32920159 W 149.25494874 2952.79 51. 74 52 .92 2350. 79 2433. 64 -91. 75 1347 .93 1321 .33 609 .14 1172. 55 0.35 5970583 .98 591921. 01 N 70. 32932577 W 149.25446323 3049.37 51. 51 53 .39 2410. 75 2493. 60 -109. 27 1423 .65 1396 .09 654 .54 1233. 14 0.45 5970630 .11 591981. 04 N 70. 32944978 W 149.25397180 3145.19 53. 19 53. 61 2469. 28 2552. 13 -126. 37 1499 .51 1471. 15 699. 66 1294. 12 1.76 5970675 .96 592041. 47 N 70. 32957303 W 149.2534 3239.79 52. 51 53. 51 2526. 41 2609. 26 -143. 29 1574 .91 1545 .85 744. 45 1354. 78 0.72 5970721 .47 592101. 57 N 70. 1 32969535 W 149.25298518 3335.72 52. 06 54. 15 2585. 09 2667. 94 -159. 98 1650 .80 1621 .13 789. 24 1416. 04 0.71 5970766 .99 592162. 28 N 70. 32981767 W 149.25248831 3431.23 54. 46 54. 37 2642. 22 2725. 07 -176. 24 1727 .33 1697. 18 833. 94 1478. 16 2.52 5970812 .44 592223. 85 N 70. 32993976 W 149.25198445 3527.24 54. 30 54. 59 2698. 14 2780. 99 -192. 53 1805 .38 1774 .80 879. 28 1541. 69 0.25 5970858 .54 592286. 81 N 70. 33006360 W 149.25146922 3589.94 53. 61 54. 05 2735. 03 2817. 88 -203. 25 1856 .07 1825 23 908. 85 1582. 87 1.30 5970888 .60 592327. 63 N 70. 33014436 W 149.25113520 3708.88 52. 59 53. 69 2806. 44 2889. 29 -224. 10 1951 .19 1919 .80 964. 93 1659. 69 0.89 5970945 .60 592403. 76 N 70. 33029751 W 149.25051208 3805.20 52. 55 53. 96 2864. 99 2947. 84 -240. 92 2027 .67 1995 .89 1010. 08 1721. 43 0.23 5970991 .49 592464. 95 N 70. 33042081 W 149.25001127 3900.17 52. 65 55. 33 2922. 67 3005. 52 -256. 46 2103 .12 2071. 06 1053. 73 1782. 96 1.15 5971035 .88 592525. 94 N 70. 33054003 W 1 4924951 21 7 3998.55 52. 62 55. 11 2982. 38 3065. 23 -271. 79 2181 .31 2149 .05 1098. 33 1847. 18 0.18 5971081 .25 592589. 61 N 70. 33066184 W 149.24899124 4087.73 52. 82 53. 83 3036. 40 3119. 25 -286. 62 2252 .27 2219 .76 1139. 57 1904. 93 1.16 5971123 .18 592646. 85 N 70. 33077445 W 149.24852283 4183.81 52. 86 53. 01 3094. 43 3177. 28 -303. 98 2328 .84 2295 .97 1185. 20 1966. 41 0.68 5971169 .55 592707. 77 N 70. 33089907 W 149.24802406 4278.82 52. 92 51. 95 3151. 76 3234. 61 -322. 38 2404 .61 2371 .27 1231. 34 2026. 51 0.89 5971216 .41 592767. 30 N 70. 33102509 W 149.24753659 4375.01 52. 97 51. 96 3209. 72 3292. 57 -341. 70 2481 .37 2447 .52 1278. 65 2086. 96 0.05 5971264 .44 592827. 17 N 70. 33115429 W 149.24704618 4470.18 52. 03 51. 48 3267. 66 3350. 51 -360. 99 2556 .87 2522 .51 1325. 43 2146 23 1.07 5971311 .92 592885. 86 N 70. 33128202 W 149.24656537 4565.47 52. 27 51. 69 3326. 13 3408. 98 -380. 40 2632 .12 2597 .25 1372 .18 2205. 19 0.31 5971359 .38 592944. 24 N 70. 33140970 W 149.24608711 4660.63 52. 62 52. 48 3384. 13 3466. 98 -399. 22 2707 .55 2672. 29 1418. 53 2264. 70 0.75 5971406 .45 593003. 19 N 70. 33153629 W 149.24560429 4762.44 52. 25 53. 22 3446. 20 3529. 05 -418. 30 2788 .26 2752. 68 1467. 27 2329. 02 0.68 5971455 .96 593066. 91 N 70. 33166937 W 149.245 4858.64 52. 25 53. 84 3505. 09 3587. 94 -435. 41 2864 .32 2828. 54 1512. 48 2390. 19 0.51 5971501 .90 593127. 52 N 70. , 33179284 W 149.244 4954.11 52. 52 54. 44 3563. 36 3646. 21 -451. 64 2939 .94 2904. 02 1556. 78 2451. 48 0.57 5971546 .93 593188. 27 N 70. 33191381 W 149.24408905 5049.70 52. 23 54. 33 3621. 72 3704. 57 -467. 57 3015 .65 2979. 61 1600. 87 2513. 03 0.32 5971591 .76 593249. 27 N 70. 33203420 W 149.24358974 5145.96 52. 17 54. 19 3680. 72 3763. 57 -483. 73 3091 .71 3055 .56 1645. 30 2574. 77 0.13 5971636 .93 593310. 46 N 70. 33215551 W 149.24308889 5241.70 52. 02 54. 53 3739. 54 3822. 39 -499. 66 3167 .26 3130 .99 1689. 31 2636. 16 0.32 5971681 .68 593371. 31 N 70. 33227571 W 149.24259083 5337.86 52. 38 54. 47 3798. 48 3881. 33 -515. 49 3243 .24 3206 .88 1733. 44 2698. 02 0.38 5971726 .54 593432. 62 N 70. 33239619 W 149.24208899 5433.69 52. 25 54. 95 3857. 06 3939. 91 -531. 03 3319 .07 3282 .65 1777. 25 2759. 92 0.42 5971771 .10 593493. 98 N 70. 33251582 W 149.24158679 5529.07 52. 73 55 .77 3915 .14 3997. 99 -545. 68 3394 .73 3358 .27 1820 .25 2822. 17 0.85 5971814 .85 593555. 70 N 70. 33263324 W 149.24108177 5624.94 52. 76 55. 14 3973. 17 4056. 02 -560. 34 3471 .04 3434 .54 1863 .52 2885. 02 0.52 5971858 .87 593618. 02 N 70. 33275138 W 149.24057184 5720.14 52. 43 54 .10 4031. 00 4113. 85 -575. 94 3546 .66 3510 .09 1907 .31 2946. 68 0.93 5971903 .39 593679. 14 N 70. 33287093 W 149.24007160 5815.15 52. 69 53 .75 4088. 76 4171. 61 -592. 41 3622 .10 3585 .41 1951 .73 3007. 65 0.40 5971948 .54 593739. 56 N 70. 33299222 W 149.23957692 5910.82 52. 83 53 .54 4146 .66 4229. 51 -609. 39 3698 .26 3661 .45 1996 .88 3068. 99 023 5971994 .43 593800. 34 N 70. 33311549 W 149.23907924 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122\V-122 Generated 1/18/2007 1:24 PM Page 2 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de tt tt tt ft ft ft tt de 100 tt ftUS ttUS (iUUEi.44 b1.Jti 5:1.11 4'104 ./4 4'L25/ .b`J -bLb ./4 :i//4 .LL :i/J/ .L5 LV4t .14 ;71"Ly .yl U.bl Sy/LV4U.5L byJiSbV. /I IV /V. JJ;SLJyJb VV 14`J. L:3t15234`Jb 6101. 92 52.79 53 .46 4262 .77 4345 .62 -644 .11 3850 .05 3812 .93 2087 .57 3190 .69 0.54 5972086.58 593920. 93 N 70. 33336313 W 149.23809178 6197. 56 52.37 53 .52 4320 .88 4403 .73 -661 .25 3926 .00 3888 .77 2132 .77 3251 .74 0.44 5972132.50 593981. 43 N 70. 33348652 W 149.23759642 6293. 14 52.23 53. 40 4379 .33 4462. 18 -678. 35 4001 .63 3964 .27 2177 .79 3312. 50 0.18 5972178.26 594041. 63 N 70. 33360945 W 149.23710342 6389. 43 52.20 53. 52 4438. 33 4521. 18 -695. 56 4077 .73 4040 .25 2223 .10 3373. 64 0.10 5972224.30 594102. 21 N 70. 33373315 W 149.23660731 6485. 12 52.21 53. 24 4496 .97 4579. 82 -712. 77 4153 .34 4115 .75 2268 .21 3434. 33 0.23 5972270.13 594162. 35 N 70. 33385630 W 149.23611487 6581. 00 52.54 53. 57 4555 .50 4638. 35 -730. 01 4229 .28 4191 .57 2313 .48 3495. 30 0.44 5972316.13 594222. 76 N 70. 33397990 W 149.23562016 6675. 72 52.84 53. 98 4612. 92 4695. 77 -746. 64 4304 .62 4266 .83 2358 .00 3556. 08 0.47 5972361.38 594282. 99 N 70. 33410145 W 149.23512701 6771. 66 53.00 53. 50 4670 .76 4753. 61 -763. 59 4381 .16 4343 .28 2403 .27 3617. 79 0.43 5972407.39 594344. 15 N 70. 33422504 W 149.23462622 6867. 98 54.60 55. 16 4727 .65 4810. 50 -780. 00 4458 .88 4420 .95 2448 .58 3680. 94 2.17 5972453.45 594406. 73 N 70. 33434874 W 149.23411383 6963. 03 58.27 57. 21 4780 .20 4863 .05 -794. 19 4538 .07 4500 .13 2492 .62 3746. 74 4.26 5972498.28 594471. 99 N 70. 33446896 W 149.23357988 0 7060. 04 62.59 57 .60 4828 .06 4910 .91 -807. 56 4622 .42 4584 .47 2538 .05 3817. 81 4.47 5972544.57 594542. 50 N 70. 33459299 W 149.233 7155. 89 65.52 55 .13 4869 .99 4952 .84 -822 .79 4708 .60 4670 .65 2585 .80 3889. 54 3.84 5972593.18 594613. 64. N 70. 33472334 W 149.23242112 7250. 97 65.34 53. 47 4909. 53 4992. 38 -841. i 1 4795 .07 4757 .06 2636 .26 3959. 76 1.60 5972644.47 594683. 24 N 70. 33486108 W 149.23185130 7346. 28 64.43 51. 47 4949. 99 5032. 84 -862. 07 4881 .36 4843 .15 2688. 82 4028. 20 2.13 5972697.86 594751. 03 N 70. 33500458 W 149.23129594 7442. 09 63.47 51. 03 4992. 06 5074. 91 -884. 75 4967 .44 4928 .91 2742. 70 4095. 33 1.08 5972752.54 594817. 50 N 70. 33515166 W 149.23075115 7536. 64 62.28 50. 16 5035. 17 5118. 02 -907. 85 5051 .59 5012 .66 2796 .11 4160. 35 1.50 5972806.73 594881. 86 N 70. 33529749 W 149.23022346 7632. 69 62.42 49. 10 5079. 75 5162. 60 -932. 58 5136 .67 5097 .21 2851 .22 4225. 17 0.99 5972862.61 594946. 00 N 70. 33544794 W 149.22969739 7727. 06 62.43 48. 27 5123. 43 5206. 28 -958. 21 5220 .32 5180 .19 2906 .44 4288. 00 0.78 5972918.59 595008. 15 N 70. 33559871 W 149.22918747 7822. 83 62.41 48. 54 5167. 77 5250. 62 -984. 62 5305 .21 5264 .37 2962 .80 4351. 48 0.25 5972975.70 595070. 95 N 70. 33575256 W 149.22867222 7918. 81 62.17 49. 77 5212 .40 5295. 25 -1010. 00 5390 .18 5348 .78 3018 .37 4415. 76 1.16 5973032.04 595134. 54 N 70. 33590428 W 149.22815053 8014. 38 62.10 50. 63 5257 .07 5339. 92 -1033. 75 5474 .67 5432 .90 3072 .45 4480. 67 0.80 5973086.90 595198. 79 N 70. 33605192 W 149.22762370 8110. 12 62.46 50. 90 5301 .61 5384 .46 -1056. 78 5559 .42 5517 .36 3126 .06 4546. 32 0.45 5973141.29 595263. 77 N 70. 33619826 W 149.22709090 8206. 44 62.25 50. 27 5346 .30 5429 .15 -1080. 22 5644 .74 5602 .37 3180 .23 4612. 23 0.62 5973196.25 595329. 02 N 70. 33634615 W 149.22655588 8302. 03 62.27 50. 70 5390. 79 5473. 64 -1103. 60 5729 .35 5686. 67 3234. 06 4677. 50 0.40 5973250.86 595393. 63 N 70. 33649310 W 149.22602613 8397. 65 62.33 51. 12 5435. 24 5518. 09 -1126. 40 5814 .01 5771 .08 3287. 45 4743. 21 0.39 5973305.03 595458. 68 N 70. 33663882 W 149.22549278 8493. 23 60.63 55. 10 5480 .89 5563. 74 -1145. 90 5897 .98 5854 .97 3337 .86 4810. 34 4.07 5973356.25 595525. 19 N 70. 33677643 W 149.22494791 8588. 45 57.99 60. 75 5529 .51 5612. 36 -1158. 20 5979 .84 5936 .71 3381 .36 4879. 65 5.81 5973400.58 595593. 96 N 70. 33689514 W 149.22438544 8684. 80 56.51 66. 85 5581 .67 5664 .52 -1162. 09 6060 .85 6016 .81 3417 .14 4952. 29 5.54 5973437.23 595666. 15 N 70. 33699276 W 149.223 8779. 83 54.74 73. 40 5635 .36 5718 .21 -1157. 23 6139 .25 6092 .64 3443 .82 5025. 96 5.98 5973464.80 595739. 50 N 70. 7 33706553 W 149.2231 8875. 57 55.12 76 .04 5690 .38 5773 .23 -1146. 06 6217 .60 6166 .71 3464 .47 5101. 54 2.29 5973486.36 595814. 81 N 70. 33712179 W 149.22258485 8970. 90 54.99 79 .41 5744 .99 5827 .84 -1130 .90 6295 .74 6239 .26 3481 .08 5177 .88 2.90 5973503.89 595890. 94 N 70. 33716702 W 149.22196546 9066. 76 55.19 81 .94 5799 .86 5882 .71 -1111 .69 6374 .34 6310 .81 3493 .81 5255 .44 2.17 5973517.56 595968. 33 N 70. 33720166 W 149.22133616 9162. 32 54.40 85 .25 5854 .96 5937 .81 -1088 .79 6452 .42 6380 .34 3502 .53 5333 .01 2.95 5973527.21 596045. 79 N 70. 33722533 W 149.22070677 9257. 90 51.67 86. 36 5912 .43 5995. 28 -1063. 60 6528 .78 6447 .18 3508 .13 5409. 17 3.00 5973533.73 596121. 86 N 70. 33724048 W 149.22008892 9354. 31 49.39 89 .25 5973 .72 6056 .57 -1036. 63 6603 .19 6511 .23 3511 .01 5483. 52 3.31 5973537.51 596196. 16 N 70. 33724820 W 149.21948573 9449. 03 48.95 93 .69 6035 .67 6118 .52 -1006 .43 6674 .85 6570 .68 3509 .18 5555. 13 3.58 5973536.55 596267. 79 N 70. 33724306 W 149.21890475 9540. 43 48.98 100 .03 6095 .71 6178 .56 -971. 65 6743 .76 6624 .24 3500 .95 5623. 52 5.23 5973529.15 596336. 26 N 70. 33722045 W 149.21835002 9635. 91 47.20 107 .01 6159 .52 6242 .37 -928. 99 6814 .77 6674 .29 3484 .42 5692. 53 5.75 5973513.46 596405. 46 N 70. 33717514 W 149.21779020 9731. 84 46.68 117 .47 6225 .12 6307 .97 -878 .98 6884 .77 6715 .92 3457 .99 5757. 24 7.98 5973487.81 596470. 49 N 70. 33710279 W 149.21726538 9827. 40 48.32 124 .50 6289 .72 6372 .57 -821 .69 6955 .18 6749 .22 3421 .72 5817. 54 5.69 5973452.27 596531. 21 N 70. 33700357 W 149.21677643 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122\V-122 Generated 1/18/2007 1:24 PM Page 3 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft ft ft ft de 100 ft ftUS ttUS 9922. 63 49. 00 128 .39 6352 .63 6435 .48 -759.84 7026.67 6777 .56 3379.25 5875 .03 3.15 5973410.50 596589. 20 N 70. 33688742 W 1 4921 631 033 10017. 92 50. 26 132. 75 6414 .37 6497 .22 -694.58 7099.25 6802 .13 3332 .03 5930 .13 3.73 5973363 .96 596644. 87 N 70. 33675832 W 149.21586359 10114. 26 50. 93 136 .05 6475 .54 6558 .39 -625.64 7173.68 6823 .34 3279 .96 5983 .30 2.74 5973312 .54 596698. 65 N 70. 33661593 W 149.21543263 10210. 14 53. 43 139 .80 6534 .34 6617 .19 -553.87 7249.41 6841 .17 3223 .73 6034 .00 4.04 5973256 .94 596750. 03 N 70. 33646222 W 149.21502168 Tie-In Survey 10305. 43 55. 40 139. 50 6589 .79 6672 .64 -479.72 7326.90 6858 .01 3164 .68 6084 .17 2.08 5973198 .50 596800. 91 N 70. 33630078 W 149.21461503 Top Whipstock (Blind) 10311. 00 55. 40 139. 60 6592. 95 6675. 80 -475.34 7331.48 6859 .04 3161 .19 6087. 15 1.48 5973195 .05 596803. 92 N 70. 33629124 W 14921459092 Base Whipstock (Blind) 10323. 00 57. 25 140. 19 6599. 60 6682. 45 -465.77 7341.47 6861 24 3153 .55 6093. 58 15.95 5973187 .49 596810. 45 N 70. 33627036 W 149.21453879 Inc + Trend 10342. 17 57. 74 141. 09 6609. 90 6692. 75 -45022 7357.64 6864 .62 3141 .05 6103. 83 4.71 5973175 .11 596820. 85 N 70. 33623619 W 14921445570 Inc + Trend 10374. 17 65. 05 142. 60 6625. 22 6708. 07 -423.06 7385.71 6869 .98 3118 .97 6121. 17 23.22 5973153 .24 596838. 45 N 70. 33617582 W 149.21431523 First MWD+IFR+MS 10406. 26 72. 13 144. 12 6636. 92 6719. 77 -393.99 7415.57 6875 .03 3095 .00 6138. 98 22.50 5973129 .50 596856. 54 N 70. 33611032 W 149.21417092 10437. 61 78. 53 144. 60 6644 .86 6727. 71 -364.35 7445.88 6879 .78 3070 .37 6156. 64 20.47 5973105 .08 596874. 50 N 70. 33604298 W 149.2140 10469. 18 86. 09 143. 46 6649 .08 6731. 93 -333.83 7477.14 6884 .99 3045 .07 6175. 00 24.21 5973080 .01 596893. 17 N 70. 33597382 W 149.2138 10493. 55 92. 17 141. 68 6649 .45 6732 .30 -310.20 7501.50 6889 .75 3025 .73 6189. 80 25.99 5973060 .85 596908. 20 N 70. 33592095 W 149.21375904 10524. 44 92. 40 145. 67 6648 .22 6731. 07 -280.11 7532.37 6895 .33 3000 .87 6208. 09 12.93 5973036 .21 596926. 78 N 70. 33585299 W 149.21361092 10556. 83 93. 08 148. 57 6646. 67 6729. 52 -248.20 7564.72 6899 .39 2973. 70 6225. 65 9.19 5973009 .26 596944. 67 N 70. 33577873 W 149.21346863 10588. 04 95. 09 151. 60 6644. 44 6727. 29 -217.27 7595.85 6901 .84 2946. 72 6241. 17 11.63 5972982 .48 596960. 52 N 70. 33570499 W 149.21334289 10620. 18 95. 40 153. 80 6641. 51 6724. 36 -185.34 7627.85 6903 .04 2918. 28 6255. 85 6.88 5972954 .22 596975. 54 N 70. 33562727 W 149.21322401 10652. 66 95. 50 157. 03 6638. 42 6721. 27 -153.02 7660.19 6902 .88 2888. 88 6269. 30 9.90 5972924 .99 596989. 34 N 70. 33554692 W 149.21311509 10684. 26 95. 57 161. 69 6635. 37 6718 22 -121.61 7691.64 6900 .70 2859. 46 6280. 38 14.68 5972895 .71 597000. 78 N 70. 33546651 W 149.21302538 10715. 63 94. 51 164. 46 6632. 61 6715. 46 -90.57 7722.89 6896 .66 2829 .57 6289. 48 9.42 5972865 .93 597010. 23 N 70. 33538483 W 149.21295180 10747. 75 94. 66 167. 40 6630. 05 6712. 90 -58.99 7754.90 6891 .09 2798 .51 6297. 26 9.14 5972834 .97 597018. 39 N 70. 33529998 W 149.21288888 10779. 78 95. 36 171. 06 6627 .25 6710. 10 -27.86 7786.81 6883 .88 2767 .17 6303. 22 11.59 5972803 .71 597024. 73 N 70. 33521434 W 149.21284073 10811. 00 94. 98 175. 31 6624 .43 6707. 28 1.92 7817.90 6874 .92 2736 .31 6306. 91 13.61 5972772 .90 597028. 79 N 70. 33513001 W 149.21281102 10844. 32 94. 52 179. 07 6621. 67 6704. 52 32.98 7851. f 1 6863 .28 2703. 15 6308. 54 11.33 5972739 .76 597030. 82 N 70. 33503942 W 149.21279805 10876. 14 94. 78 180. 21 6619. 09 6701. 94 62.15 7882.82 6851 .04 2671. 43 6308. 74 3.66 5972708 .05 597031. 40 N 70. 33495278 W 149.21279665 10907. 60 94. 70 180. 79 6616. 49 6699. 34 90.80 7914.18 6838 .62 2640 .08 6308. 46 1.85 5972676 .71 597031. 51 N 70. 33486713 W 149.21279908 10939. 49 94. 95 179. 79 6613. 81 6696. 66 119.88 7945.95 6826 .27 2608 .31 6308. 30 3.22 5972644 .93 597031. 73 N 70. 33478032 W 149.21280060 10972. 49 95. 15 180. 25 6610. 91 6693. 76 150.03 7978.83 6813 .77 2575 .43 6308. 29 1.52 5972612 .07 597032. 12 N 70. 33469052 W 149.21280092 11004. 31 93. 45 178. 65 6608. 52 6691. 37 179.25 8010.55 6802 .12 2543 .71 6308. 60 7.33 5972580 .35 597032. 81 N 70. 33460385 W 149.2127 11035. 97 92. 07 178. 57 6607. 00 6689. 85 208.56 8042.18 6791 .08 2512 .09 6309. 36 4.37 5972548 .75 597033. 95 N 70. 33451748 W 149.2127' 11067. 53 91. 92 178. 93 6605 .90 6688 .75 237.76 8073.72 6780 .11 2480 .56 6310. 05 1.24 5972517 .23 597035. 02 N 70. 33443133 W 14921278729 11099. 39 91. 89 179. 03 6604 .84 6687 .69 267.19 8105.56 6769 .06 2448 .72 6310. 62 0.33 5972485 .40 597035. 98 N 70. 33434435 W 149.21278291 11131. 67 91. 93 179. 16 6603. 76 6686. 61 296.98 8137.82 6757 .93 2416. 47 6311. 13 0.42 5972453 .16 597036. 88 N 70. 33425623 W 149.21277900 11163, 31 91. 76 179. 68 6602. 74 6685. 59 326.11 8169.45 6746 .99 2384 .84 6311. 45 1.73 5972421 .55 597037. 58 N 70. 33416984 W 149.21277662 11195, 00 91. 68 180. 08 6601 .79 6684. 64 355.19 8201.12 6735 .92 2353 .17 6311. 52 1.29 5972389 .88 597038. 03 N 70. 33408330 W 149.21277629 11226. 90 92. 89 180. 00 6600 .52 6683 .37 384.42 8233.00 6724 .83 2321 .29 6311. 49 3.80 5972358 .01 597038. 39 N 70. 33399622 W 149.21277669 11258. 74 91. 68 177. 76 6599 .25 6682 .10 413.84 8264.81 6714 .50 2289 .49 6312. 12 7.99 5972326 .21 597039. 40 N 70. 33390933 W 149.21277186 11291. 14 91. 21 176. 87 6598 .43 6681 28 444.12 8297.20 6704 .97 2257 .13 6313. 63 3.11 5972293 .88 597041. 31 N 70. 33382094 W 149.21275978 11323. 04 91. 96 177. 18 6597 .55 6680 .40 473.99 8329.09 6695 .88 2225 .29 6315. 29 2.54 5972262 .06 597043. 35 N 70. 33373394 W 149.21274657 11354. 62 90. 18 174. 77 6596 .96 6679 .81 503.76 8360.66 6687 .57 2193 .80 6317. 50 9.49 5972230 .60 597045. 94 N 70. 33364790 W 149.21272881 SurveyEditor Ver SP 2,1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122\V-122 Generated 1/18/2007 1:24 PM Page 4 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft n ft ft ft ft de 00 ft ftUS ftUS 11:StfbJy yV./Z 1/b .bZ b5yb ./I bb/y .bb O33. b/ C3yZ.Z3 bb/`J .tSZ LIbZ .34 b3ZV.IJ 3.1`J O`J/G lyy.l6 b`J/V46.y/ IV /V.333JOI~b VV 14y.G lL/V/b/ 11418.27 90.22 173 .62 6596 .45 6679 .30 564. 16 8424.31 6672 .40 2130 .40 6323.16 6.43 5972167.29 597052.36 N 70. 33347470 W 149.21268340 11450.28 90.76 173 .81 6596 .18 6679 .03 594. 74 8456.32 6665 .64 2098 .59 6326.66 1.79 5972135.52 597056.25 N 70. 33338777 W 149.21265519 11481.87 90.76 175 .54 6595 .76 6678 .61 624. 76 8487.90 6658 .59 2067 .14 6329.59 5.48 5972104.11 597059.56 N 70. 33330185 W 149.21263163 11513.81 89.31 172 .12 6595 .74 6678 .59 655. 25 8519.84 6652 .07 2035 .39 6333.02 11.63 5972072.41 597063.38 N 70. 33321511 W 149.21260401 11546.45 89.05 172 .33 6596 .21 6679 .06 686 .67 8552.48 6646 .45 2003 .05 6337.44 1.02 5972040.13 597068.18 N 70. 33312675 W 149.21256842 11577.49 88.13 171 .00 6596 .97 6679 .82 716 .62 8583.51 6641 .56 1972 .35 6341.94 5.21 5972009.49 597073.05 N 70. 33304287 W 149.21253214 11609.64 89.11 168. 61 6597 .74 6680. 59 747. 90 8615.65 6637 .68 1940 .72 6347.63 8.03 5971977.93 597079.12 N 70. 33295645 W 149.21248622 11641.42 88.26 165. 68 6598. 47 6681. 32 779. 12 8647.42 6635 .45 1909 .75 6354.69 9.60 5971947.05 597086.56 N 70. 33287182 W 149.21242911 11673.70 86.40 163. 54 6599 .98 6682. 83 811. 05 8679.66 6634 .78 1878 .66 6363.25 8.78 5971916.07 597095.49 N 70. 33278687 W 149.21235992 11705.12 89.92 162. 08 6600 .99 6683 .84 842. 26 8711.06 6635 .26 1848 .67 6372.53 12.13 5971886.20 597105.13 N 70. 33270491 W 149.21228486 11737.08 87.24 160 .66 6601 .78 6684 .63 874. 09 8743.01 6636 .70 1818 .39 6382.73 9.49 5971856.05 597115.70 N 70. 33262218 W 149.2122 11767.68 89.19 159 .89 6602 .73 6685 .58 904. 61 8773.59 6638 .81 1789 .61 6393.06 6.85 5971827.39 597126.37 N 70. 33254351 W 149.2121 11800.13 91.89 156 .46 6602 .43 6685 .28 937. 03 8806.04 6642 .39 1759 .49 6405.12 13.45 5971797.43 597138.79 N 70. 33246121 W 149.21202116 11832.10 92.51 156 .98 6601 .20 6684 .05 968. 98 8837.99 6646 .87 1730 .14 6417.74 2.53 5971768.24 597151.77 N 70. 33238101 W 149.21191896 11864.39 89.36 156. 72 6600. 67 6683. 52 1001. 26 8870.27 6651 .47 1700. 46 6430.43 9.79 5971738.72 597164.82 N 70. 33229989 W 149.21181623 11896.16 89.14 156. 72 6601 .09 6683. 94 1033. 03 8902.04 6656 .22 1671 .28 6442.99 0.69 5971709.69 597177.73 N 70. 33222014 W 149.21171460 11928.54 89.46 156. 53 6601. 48 6684. 33 1065. 41 8934.41 6661 .27 1641 .56 6455.83 1.15 5971680.13 597190.93 N 70. 33213892 W 149.21161062 11960.10 89.01 156. 47 6601 .90 6684. 75 1096. 96 8965.97 6666 .41 1612 .62 6468.42 1.44 5971651.35 597203.86 N 70. 33205983 W 149.21150876 11991.93 87.78 156. 49 6602 .80 6685. 65 1128. 78 8997.79 6671 .74 1583 .45 6481.12 3.86 5971622.33 597216.91 N 70. 33198010 W 149.21140598 12023.88 89.15 154 .84 6603 .65 6686. 50 1160. 71 9029.72 6677 .70 1554 .35 6494.28 6.71 5971593.40 597230.42 N 70. 33190057 W 149.21129945 12055.73 88.70 153 .27 6604 .25 6687 .10 1192. 53 9061.57 6684 .65 1525 .71 6508.21 5.13 5971564.94 597244.70 N 70. 33182231 W 149.21118665 12087.64 87.13 151 .98 6605 .41 6688 .26 1224. 34 9093.46 6692 .53 1497 .40 6522.87 6.37 5971536.80 597259.70 N 70. 33174492 W 149.21106794 12118.90 87.15 153. 66 6606. 97 6689. 82 1255. 49 9124.68 6700 .29 1469. 62 6537.13 5.37 5971509.21 597274.29 N 70. 33166901 W 149.21095247 12150.53 87.78 152. 57 6608. 37 6691. 22 1287. 04 9156.28 6708 .12 1441. 44 6551.42 3.98 5971481.20 597288.92 N 70. 33159199 W 149.21083678 12182.77 87.71 152. 37 6609 .64 6692. 49 1319. 17 9188.49 6716 .59 1412. 88 6566.31 0.66 5971452.82 597304.15 N 70. 33151391 W 149.21071622 12214.69 86.49 151 .28 6611 .25 6694 .10 1350. 94 9220.37 6725 .47 1384 .77 6581.36 5.12 5971424.91 597319.54 N 70. 33143710 W 149.21059434 12246.58 86.58 150 .41 6613 .18 6696 .03 1382. 62 9252.20 6734 .99 1356 .98 6596.87 2.74 5971397.30 597335.38 N 70. 33136112 W 149.21046877 12278.39 86.58 150 .58 6615 .08 6697 .93 1414. 19 9283.95 6744 .80 1329 .34 6612.51 0.53 5971369.86 597351.35 N 70. 33128559 W 149.21034213 12310.25 86.85 152 .39 6616 .90 6699 .75 1445. 88 9315.76 6754 .25 1301 .39 6627.69 5.73 5971342.10 597366.87 N 70. 33120920 W 149.210 12341.95 86,46 152 .37 6618 .75 6701 .60 1477 .44 9347.41 6763 .31 1273 .35 6642.36 1.23 5971314.24 597381.88 N 70. 33113256 W 149.21010039 12373.69 87.33 151 .81 6620 .47 6703. 32 1509. 04 9379.10 6772 .68 1245 .35 6657.20 3.26 5971286.42 597397.05 N 70. 33105602 W 149.20998028 12405.48 87,50 151 .74 6621 .91 6704. 76 1540. 69 9410.86 6782 .36 1217 .36 6672.22 0.58 5971258.62 597412.41 N 70. 33097954 W 149.20985867 12437.44 87,12 152 .05 6623 .41 6706 .26 1572. 51 9442.78 6792 .17 1189 .20 6687.26 1.53 5971230.65 597427.78 N 70. 33090257 W 149.20973690 12470.09 85.35 151 .72 6625 .55 6708 .40 1604. 98 9475.36 6802 .33 1160 .47 6702.61 5.51 5971202.11 597443.48 N 70. 33082403 W 149.20961260 12501.79 86.92 152 .53 6627 .69 6710 .54 1636. 51 9506.99 6812 .19 1132 .51 6717.39 5.57 5971174.33 597458.60 N 70. 33074762 W 149.20949288 12533.40 86.81 154 .34 6629 .42 6712 .27 1668 .03 9538.55 6821 .49 1104 .28 6731.51 5.73 5971146.28 597473.06 N 70. 33067046 W 149.20937861 12565.73 85.32 154 .20 6631 .63 6714 .48 1700 .25 9570.81 6830 .67 1075 .23 6745.51 4.63 5971117.40 597487.41 N 70. 33059105 W 149.20926527 12597.62 87.85 153 .49 6633 .53 6716 .38 1732 .05 9602.64 6840 .10 1046 .66 6759.54 8.24 5971089.00 597501.78 N 70. 33051297 W 149.20915168 12629.91 87.61 150 .04 6634 .81 6717. 66 1764. 20 9634.90 6850 .90 1018 .24 6774.80 10.70 5971060.77 597517.39 N 70. 33043528 W 149.20902812 12661.50 89.53 148.71 6635.60 6718.45 1795.53 9666.48 6862.83 991.06 6790.89 7.39 5971033.79 597533.80 N 70.33036101 W 149.20889786 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Plan V-122 (S-U)\V-122\V-.122\V-122. Generated 1/18/2007 1:24 PM Page 5 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft n n n ft n de 100 ft nUS ftUS 1Lb`JL. 44 `JU. 4b 14b .3/ bbJb.bl b/1i5 .4b 1CLb .Vy yby/.4L bC/b.5b yb4 .yb b25U/.SV tS. I;S 5y/1VU/.iSy 5y/b~U./L IV /V. :S:SULiS`Jbb VV 14`J.LUtS/bJJtS 12724. 92 89 .38 144 .22 6635.65 6718 .50 1857 .94 9729.90 6890 .17 938 .26 6825.99 7.39 5970981.42 597569. 53 N 70. 33021667 W 149.20861362 12756. 89 91 .92 141 .93 6635.29 6718 .14 1889 .03 9761.86 6905 .77 912 .71 6845.19 10.70 5970956.11 597589. 03 N 70. 33014681 W 149.20845808 12789. 06 92 .75 140 .56 6633.98 6716 .83 1920 .03 9794.01 6922 .45 887 .64 6865.31 4.98 5970931.29 597609. 45 N 70. 33007829 W 149.20829509 12821. 35 92 .10 140 .47 6632.62 6715 .47 1951 .04 9826.27 6939 .66 862 .74 6885.82 2.03 5970906.64 597630. 27 N 70. 33001022 W 149.20812891 12853. 38 90 .54 140 .80 6631.88 6714 .73 1981 .84 9858.29 6956 .79 837 .99 6906.13 4.98 5970882.14 597650. 87 N 70. 32994253 W 149.20796439 12885. 16 88. 94 142. 41 6632.02 6714 .87 2012. 54 9890.07 6973 .43 813 .08 6925.87 7.14 5970857.47 597670. 91 N 70. 32987444 W 149.20780451 12916. 46 90. 93 143. 88 6632.06 6714 .91 2042. 99 9921.36 6989 .21 788 .04 6944.64 7.90 5970832.66 597689. 98 N 70. 32980598 W 149.20765246 12949. 66 88. 86 143. 19 6632.12 6714 .97 2075. 34 9954.56 7005 .86 761 .34 6964.37 6.57 5970806.21 597710. 03 N 70. 32973299 W 149.20749265 12980. 42 91. 57 143. 13 6632.00 6714 .85 2105. 26 9985.32 7021 .57 736 .72 6982.81 8.81 5970781.82 597728. 76 N 70. 32966570 W 149.20734328 13012. 62 91. 20 139 .93 6631.22 6714 .07 2136 .35 10017.51 7038 .89 711 .52 7002.84 10.00 5970756.87 597749. 09 N 70. 32959681 W 149.20718109 13044. 30 89. 02 141 .01 6631.16 6714 .01 2166 .79 10049.19 7056 .53 687 .09 7023.00 7.68 5970732.68 597769. 54 N 70. 32953001 W 149.2070 13076. 50 90. 31 141 .37 6631.35 6714 .20 2197 .84 10081.39 7074 .22 662 .00 7043.18 4.16 5970707.84 597790. 02 N 70. 32946141 W 149.2068 13107. 28 89. 10 139 .92 6631.51 6714 .36 2227 .45 10112.17 7091 .47 638 .20 7062.70 6.14 5970684.28 597809. 83 N 70. 32939634 W 149.20669620 13139. 85 89. 27 140. 35 6631.97 6714. 82 2258. 69 10144.73 7110 .06 613 .21 7083.57 1.42 5970659.54 597831. 00 N 70. 32932800 W 149.20652711 13171. 46 90. 11 141. 60 6632.14 6714. 99 2289. 14 10176.34 7127 .82 588. 65 7103.47 4.76 5970635.23 597851. 20 N 70. 32926087 W 149.20636590 13203. 64 90. 01 144. 60 6632.11 6714 .96 2320. 44 10208.52 7145 .00 562. 92 7122.79 9.33 5970609.74 597870. 82 N 70. 32919052 W 149.20620943 13235. 79 91. 34 144. 26 6631.73 6714 .58 2351. 87 10240.67 7161 .64 536. 77 7141.49 4.27 5970583.82 597889. 84 N 70. 32911904 W 149.20605798 13267. 75 91. 10 145. 80 6631.05 6713 .90 2383. 18 10272.62 7177 .99 510. 59 7159.80 4.88 5970557.86 597908. 46 N 70. 32904746 W 149.20590967 13299. 33 90. 02 146. 89 6630.74 6713 .59 2414. 26 10304.20 7193 .63 484 .30 7177.30 4.86 5970531.79 597926. 28 N 70. 32897561 W 149.20576796 13330. 85 90. 72 149. 94 6630.54 6713 .39 2445. 46 10335.72 7208 .34 457 .46 7193.81 9.93 5970505.15 597943. 11 N 70. 32890222 W 149.20563431 13362. 71 90. 93 150 .53 6630.08 6712 .93 2477. 12 10367.58 7222 .43 429 .80 7209.63 1.97 5970477.69 597959. 25 N 70. 32882663 W 149.20550627 13394. 19 91. 03 152 .62 6629.54 6712 .39 2508. 48 10399.05 7235 .79 402 .12 7224.61 6.65 5970450.20 597974. 57 N 70. 32875098 W 149.20538500 13426. 33 90. 50 151 .45 6629.11 6711 .96 2540 .52 10431.19 7249 .32 373 .74 7239.68 4.00 5970422.00 597989. 98 N 70. 32867339 W 149.20526301 Tie-In Survey 13458. 41 90. 00 150. 14 6628.97 6711. 82 2572. 44 10463.27 7263 .56 345. 74 7255.33 4.37 5970394.19 598005. 97 N 70. 32859686 W 149.20513630 MWF+IFR+MS 13488. 87 91. 28 149. 54 6628.63 6711. 48 2602. 69 10493.73 7277 .65 319. 40 7270.63 4.64 5970368.05 598021. 58 N 70. 32852487 W 149.20501242 13522. 31 87. 81 149. 96 6628.90 6711 .75 2635. 89 10527.16 7293 .26 290. 52 7287.48 10.45 5970339.38 598038. 77 N 70. 32844593 W 149.20487606 13554. 55 86. 68 147 .18 6630.45 6713 .30 2667. 78 10559.36 7309 .00 263 .05 7304.27 9.30 5970312.11 598055. 89 N 70. 32837082 W 149.20474012 13585. 46 87. 74 143 .85 6631.95 6714 .80 2698. 08 10590.23 7325 .60 237 .60 7321.74 11.29 5970286.88 598073. 68 N 70. 32830127 W 149.20459859 13618. 04 91. 00 141 .67 6632.31 6715 .16 2729 .71 10622.81 7344 .51 211 .67 7341.45 12.04 5970261.19 598093. 70 N 70. 32823037 W 149.2044 13650. 42 89. 48 139 .80 6632.18 6715 .03 2760 .87 10655.19 7364 .31 186 .61 7361.95 7.44 5970236.38 598114. 49 N 70. 32816184 W 149.20427298 13681. 83 89 .34 138 .38 6632.50 6715 .35 2790 .83 10686.60 7384 .31 162 .87 7382.51 4,54 5970212.90 598135. 34 N 70. 32809694 W 149.20410638 13713. 93 89. 54 i 38. 14 6632.81 6715 .66 2821. 31 10718.69 7405 .19 138. 92 7403.88 0.97 5970189.21 598157. 00 N 70. 32803145 W 149.20393329 13746. 33 90. 48 137. 08 6632.81 6715 .66 2851. 96 10751.09 7426 .62 114. 99 7425.73 4.37 5970165.55 598179. 12 N 70. 32796602 W 149.20375635 13777. 93 90. 68 137 .24 6632.49 6715 .34 2881. 77 10782.69 7447 .78 91 .82 7447.21 0.81 5970142.64 598200. 89 N 70. 32790266 W 149.20358232 13809. 20 90. 00 136 .60 6632.30 6715 .15 2911 .22 10813.96 7468 .89 68 .98 7468.57 2.99 5970120.06 598222. 52 N 70. 32784021 W 149.20340931 13841. 86 90 .52 132 .70 6632.15 6715 .00 2941 .53 10846.62 7491 .94 46 .03 7491.80 12.05 5970097.40 598246. 02 N 70. 32777746 W 149.20322112 13873. 16 91 .20 132 .01 6631.68 6714 .53 2970 .08 10877.92 7514 .97 24 .95 7514.93 3.09 5970076.60 598269. 40 N 70. 32771979 W 149.20303376 13903. 57 90 .65 132 .15 6631.19 6714 .04 2997 .76 10908.32 7537 .50 4 .57 7537.49 1.87 5970056.50 598292. 21 N 70. 32766406 W 149.20285092 13936. 75 90 .48 130 .86 6630.87 6713 .72 3027 .82 10941.50 7562 .36 -17 .41 7562.34 3.92 5970034.82 598317. 32 N 70. 32760393 W 149.20264962 13968. 85 90. 31 133 .44 6630.64 6713 .49 3057 .05 10973.60 7586 .24 -38 .95 7586.14 8.05 5970013.57 598341. 37 N 70. 32754502 W 149.20245684 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122\V-122 Generated 1/18/2007 1:24 PM Page 6 of 7 Comments Measured Inclination Azimuth Suh-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft n n ft de 00 ft ftUS ftUS 14000.lb t3/.bZ 131.3/ bb31.L1 b/14.Vb 3Vi3~.bl 11UU4.Cy /bV`J.42S -bV.Ub /bVy.L4 IV.C34 byby`J`JZ./b 14032.30 87.44 130.88 6632.60 6715.45 3114.62 11037.01 7633.87 -81.18 7633.44 1.62 5969971.92 14063.67 87.93 132.56 6633.86 6716.71 3143.07 11068.36 7657.51 -102.04 7656.83 5.57 5969951.35 14095.74 87.92 134.31 6635.02 6717.87 3172.55 11100.41 7681.11 -124.07 7680.10 5.45 5969929.60 14128.42 88.67 136.51 6636.00 6718.85 3203.02 11133.07 7704.44 -147.33 7703.03 7.11 5969906.62 14160.59 90.68 138.79 6636.18 6719.03 3233.46 11165.24 7726.60 -171.11 7724.70 9.45 5969883.11 14192.96 89.26 137.54 6636.20 6719.05 3264.18 11197.61 7748.75 -195.22 7746.29 5.84 5969859.26 14224.18 88.06 137.60 6636.93 6719.78 3293.70 11228.82 7770.42 -218.26 7767.35 3.85 5969836.48 14255.88 87.24 138.75 6638.23 6721.08 3323.76 11260.49 7792.22 -241.86 7788.47 4.45 5969813.14 14288.49 90.92 140.85 6638.75 6721.60 3354.98 11293.09 7814.07 -266.76 7809.51 12.99 5969788.50 14320.28 91.30 139.08 6638.13 6720.98 3385.44 11324.88 7835.36 -291.09 7829.96 5.69 5969764.42 14351.67 90.03 137.48 6637.77 6720.62 3415.25 11356.26 7857.14 -314.52 7850.84 6.51 5969741.25 Last MWD+IFR+MS 14391.11 87.15 136.14 6638.74 6721.59 3452.36 11395.69 7885.30 -343.26 7877.82 8.05 5969712.83 TD (Projected) 14437.00 87.15 136.14 6641.02 6723.87 3495.32 11441.52 7918.53 -376.31 7909.58 0.00 5969680.18 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro sing le shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assu mes a BHA sag correction is appl ied to enh ance inclination accuracy. ) Legal Description: Northi ng (Y) (ftUS] Easting (X) [ftUS] Surface : 4711 FSL 1546 FEL S11 T11 N R11 E UM 5969960.76 590756.02 BHL : 4363 FSL 385 9 FEL S7 T11 N R12E UM 5969712.83 598636.69 by83b4./3 IV /U.3G/423/31 VV 14y.LULLbyb0 598389.17 N 70.32742953 W 149.20207364 598412.82 N 70.32737248 W 149.20188411 598436.35 N 70.32731222 W 149.20169558 598459.56 N 70.32724861 W 149.20150984 598481.51 N 70.32718360 W 149.20133433 598503.39 N 70.32711766 W 149.20115947 598524.72 N 70.32705467 W 149.20098891 598546.12 N 70.32699013 W 149.20081785 598567.46 N 70.32692205 W 149.20064744 598588.20 N 70.32685551 W 149.20048187 598609.37 N 70.32679145 W 149.2003 598636.69 N 70.32671285 W 149.2000 598668.84 N 70.32662247 W 149.19983694 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V•122\V-122 Generated 1/18/2007 1:24 PM Page 7 of 7 by .~. . u~ ~~ , ..t, L V-122PB1 Survey Resort Schlumherger Report Date: 16-Dea06 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 65.230° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: V-Pad /Plan V-122 (S-U) TVD Reference Datum: Rotary Table Well: V-122 TVD Reference Elevation: 82.85 ft relative to MSL Borehole: V-122PB1 Sea Bed /Ground Level Elevation: 55.15 ft relative to MSL UWVAPI#: 500292332870 Magnetic Declination: 23.845° Survey Name /Date: V-122PB1 /December 16, 2006 Total Field Strength: 57630.314 nT Tort /AHD / DDI / ERD ratio: 206.639° / 7637.61 ft / 6.389 / 1.108 Magnetic Dip: 80.884° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 18, 2006 Location LaULong: N 70.32766191, W 149.26397215 Magnetic Declination Model: BGGM 2006 Location Grid NIE V/X: N 5969960.760 ftUS, E 590756.020 ftUS North Reference: True Norih Grid Convergence Angle: +0.69307258° Total Corr Mag North -> True North: +23.845° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft tt ft tt ft ft ft de 100 tt ttUS ftUS Ftlt V.VV V.VV V.UU 'i5L.t55 U.VV V.UU U.VV V.VU U.UV U.VV V.VV ~yO~~OV./O J~V/~O.VL IV /V.JL/0011 VV 14y.LOJ~/L IJ First GYD GC SS 100.00 0.32 36.37 17.15 100.00 0.24 0.28 0.28 0.22 0.17 0.32 5969960.99 590756.18 N 70.32766253 W 149.26397081 173.00 0.29 26.16 90.15 173.00 0.57 0.67 0.67 0.55 0.37 0.08 5969961.32 590756.38 N 70.32766343 W 149.26396917 266.00 0.72 75.06 183.14 265.99 1.33 1.45 1.38 0.92 1.04 0.62 5969961.69 590757.05 N 70.32766442 W 149.26396375 360.00 1.75 66.17 277.12 359.97 3.34 3.47 3.35 1.65 2.92 1.11 5969962.44 590758.92 N 70.32766642 W 149.26394847 447.00 3.46 12.36 364.04 446.89 6.26 7.17 6.68 4.75 4.70 3.23 5969965.57 590760.66 N 70.32767489 W 149.26393406 540.00 4.84 2.62 456.79 539.64 9.75 13.88 12.66 11.41 5.48 1.66 5969972.24 590761.36 N 70.32769309 W 149.26392773 630.00 6.98 13.67 546.31 629.16 14.90 23.12 21.66 20.52 6.94 2.68 5969981.36 590762.71 N 70.32771797 W 149.26391584 723.00 7.84 42.75 638.57 721.42 24.28 34.86 33.15 30.67 12.59 4.09 5969991.58 590768.23 N 70.32774570 W 149.26387008 last GYD GC SS 814.00 9.52 59.81 728.54 811.39 37.51 48.50 45.45 39.02 23.31 3.36 5970000.05 590778.85 N 70.32776850 W 149.26378315 First MWD+IFR+MS 851.12 10.87 63.04 765.07 847.92 44.06 55.06 51.21 42.15 29.08 3.95 5970003.25 590784.59 N 70.32777705 W 149.2637 943.72 12.86 65.33 855.69 938.54 63.09 74.10 68.40 50.41 46.23 2.21 5970011.72 590801.63 ' N 70.32779962 W 149.263 1039.70 16.70 65.96 948.48 1031.33 87.57 98.58 91.41 60.49 68.54 4.00 5970022.07 590823.81 N 70.32782716 W 149.26341 7 1135.17 20.86 65.69 1038.84 1121.69 118.30 129.31 121.10 73.08 96.57 4.36 5970034.99 590851.69 N 70.32786155 W 149.26318907 1229.99 24.24 65.16 1126.40 1209.25 154.66 165.67 156.79 88.21 129.63 3.57 5970050.52 590884.56 N 70.32790289 W 149.26292100 1325.37 27.08 66.48 1212.37 1295.22 195.95 206.96 197.58 105.10 167.31 3.04 5970067.87 590922.03 N 70.32794903 W 149.26261543 1421.67 29.33 67.94 1297.23 1380.08 241.43 252.47 242.60 122.71 209.27 2.44 5970085.98 590963.77 N 70.32799714 W 149.26227514 1517.40 32.30 73.70 1379.45 1462.30 290.17 301.48 290.78 138.70 255.57 4.37 5970102.53 591009.87 N 70.32804082 W 149.26189969 1613.89 35.33 75.23 1459.61 1542.46 343.16 355.17 343.31 153.05 307.31 3.26 5970117.50 591061.42 N 70.32808002 W 149.26148017 1707.50 39.74 79.42 1533.84 1616.69 398.86 412.17 398.86 165.46 362.93 5.44 5970130.58 591116.89 N 70.32811390 W 149.26102911 1802.51 41.22 79.01 1606.10 1688.95 458.71 473.84 459.01 177.00 423.52 1.58 5970142.85 591177.32 N 70.32814543 W 149.26053780 1900.86 43.47 76.05 1678.80 1761.65 523.43 540.08 524.33 191.34 488.17 3.06 5970157.97 591241.80 N 70.32818458 W 149.26001347 1996.78 45.35 72.41 1747.32 1830.17 589.70 607.19 591.14 209.61 552.74 3.30 5970177.02 591306.13 N 70.32823448 W 149.25948991 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Plan V-122 (S-U)\V-122\V-122PB1\V-122PB1 Generated 1/18/2007 1:24 PM Page 1 of 4 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n n n n n ft n de 100 ft nUS ftUS 2091.44 47.10 6/.1S 181L.8:3 18y5.88 85/./y (1/5.51 (iby.44 L;i;i.2(i 8111.81 4.4'L 5'J/U1U1.44 byl;iliy.yl N /U.:iGB'Ly`JU8 W 14`J.L58y/ULy 2187.31 49.42 61.79 1876.68 1959.53 729.27 747.02 730.69 264.12 681.29 4.82 5970233.07 591434.00 N 70.32838337 W 14925844742 2283.52 52.72 57.84 1937.14 2019.99 803.73 821.84 804.65 301.78 745.92 4.69 5970271.51 591498.17 N 70.32848625 W 149.25792327 2378.40 52.42 57.56 1994.81 2077.66 878.43 897.19 878.89 342.04 809.61 0.39 5970312.54 591561.35 N 70.32859622 W 149.25740679 2474.64 51.15 54.26 2054.36 2137.21 953.03 972.79 953.17 384.40 872.22 3.00 5970355.64 591623.45 N 70.32871191 W 149.25689898 2569.81 50.60 54.69 2114.41 2197.26 1025.56 1046.62 1025.56 427.30 932.31 0.68 5970399.26 591683.00 N 70.32882909 W 1 4925641 1 67 2665.17 52.12 52.59 2173.96 2256.81 1098.51 1121.10 1098.58 471.46 992.27 2.34 5970444.14 591742.43 N 70.32894972 W 149.25592533 2761.41 52.25 52.49 2232.96 2315.81 1172.68 1197.13 1173.04 517.70 1052.62 0.16 5970491.11 591802.21 N 70.32907603 W 149.25543587 2857.23 52.00 52.65 2291.79 2374.64 1246.48 1272.76 1247.32 563.67 1112.69 0.29 5970537.80 591861.70 N 70.32920159 W 149.25494874 2952.79 51.74 52.92 2350.79 2433.64 1319.88 1347.93 1321.33 609.14 1172.55 0.35 5970583.98 591921.01 N 70.32932577 W 149.25446323 3049.37 51.51 53.39 2410.75 2493.60 1393.92 1423.65 1396.09 654.54 1233.14 0.45 5970630.11 591981.04 N 70.32944978 W 149.25397180 3145.19 53.19 53.61 246928 2552.13 1468.20 1499.51 1471.15 699.66 1294.12 1.76 5970675.96 592041.47 N 70.32957303 W 149.2534 3239.79 52.51 53.51 2526.41 2609.26 1542.05 1574.91 1545.85 744.45 1354.78 0.72 5970721.47 592101.57 N 70.32969535 W 149.25298518 3335.72 52.06 54.15 2585.09 2667.94 1616.43 1650.80 1621.13 789.24 1416.04 0.71 5970766.99 592162.28 N 70.32981767 W 149.25248831 3431.23 54.46 54.37 2642.22 2725.07 1691.57 1727.33 1697.18 833.94 1478.16 2.52 5970812.44 592223.85 N 70.32993976 W 149.25198445 3527.24 54.30 54.59 2698.14 2780.99 1768.24 1805.38 1774.80 879.28 1541.69 0.25 5970858.54 592286.81 N 70.33006360 W 149.25146922 3589.94 53.61 54.05 2735.03 2817.88 1818.02 1856.07 1825.23 908.85 1582.87 1.30 5970888.60 592327.63 N 70.33014436 W 149.25113520 3708.88 52.59 53.69 2806.44 2889.29 1911.27 1951.19 1919.80 964.93 1659.69 0.89 5970945.60 592403.76 N 70.33029751 W 149.25051208 3805.20 52.55 53.96 2864.99 2947.84 1986.25 .2027.67 1995.89 1010.08 1721.43 0.23 5970991.49 592464.95 N 70.33042081 W 149.25001127 3900.17 52.65 55.33 2922.67 3005.52 2060.41 2103.12 2071.06 1053.73 1782.96 1.15 5971035.88 592525.94 N 70.33054003 W 149.24951217 3998.55 52.62 55.11 2982.38 3065.23 2137.41 2181.31 2149.05 1098.33 1847.18 0.18 5971081.25 592589.61 N 70.33066184 W 149.24899124 4087.73 52.82 53.83 3036.40 3119.25 2207.12 2252.27 2219.76 1139.57 1904.93 1.16 5971123.18 592646.85 N 70.33077445 W 149.24852283 4183.81 52.86 53.01 3094.43 3177.28 2282.07 2328.84 2295.97 1185.20 1966.41 0.68 5971169.55 592707.77 N 70.33089907 W 149.24802406 4278.82 52.92 51.95 3151.76 3234.61 2355.97 2404.61 2371.27 1231.34 2026.51 0.89 5971216.41 592767.30 N 70.33102509 W 149.24753659 4375.01 52.97 51.96 3209.72 3292.57 2430.68 2481.37 2447.52 1278.65 2086.96 0.05 5971264.44 592827.17 N 70.33115429 W 149.24704618 4470.18 52.03 51.48 3267.66 3350.51 2504.09 2556.87 2522.51 1325.43 2146.23 1.07 5971311.92 592885.86 N 70.33128202 W 149.24656537 4565.47 52.27 51.69 3326.13 3408.98 2577.21 2632.12 2597.25 1372.18 2205.19 0.31 5971359.38 592944.24 N 70.33140970 W 14924608711 4660.63 52.62 52.4$ 3384.13 3466.98 2650.68 2707.55 2672.29 1418.53 2264.70 0.75 5971406.45 593003.19 N 70.33153629 W 149.24560429 4762.44 52.25 53.22 3446.20 3529.05 2729.50 2788.26 2752.68 1467.27 2329.02 0.68 5971455.96 593066.91 N 70.33166937 W 149.245 4858.64 52.25 53.84 3505.09 3587.94 2803.98 2864.32 2828.54 1512.48 2390.19 0.51 5971501.90 593127.52 N 70.33179284 W 149.2445 4954.11 52.52 54.44 3563.36 3646.21 2878.19 2939.94 2904.02 1556.78 2451.48 0.57 5971546.93 593188.27 N 70.33191381 W 149.24408905 5049.70 52.23 54.33 3621.72 3704.57 2952.55 3015.65 2979.61 1600.87 2513.03 0.32 5971591.76 593249.27 N 70.33203420 W 149.24358974 5145.96 52.17 54.19 3680.72 3763.57 3027.22 3091.71 3055.56 1645.30 2574.77 0.13 5971636.93 593310.46 N 70.33215551 W 149.24308889 5241.70 52.02 54.53 3739.54 3822.39 3101.41 316726 3130.99 1689.31 2636.16 0.32 5971681.68 593371.31 N 70.33227571 W 149.24259083 5337.86 52.38 54.47 3798.48 3881.33 3176.06 3243.24 3206.88 1733.44 2698.02 0.38 5971726.54 593432.62 N 70.33239619 W 149.24208899 5433.69 52.25 54.95 3857.06 3939.91 3250.62 3319.07 3282.65 177725 2759.92 0.42 5971771.10 593493.98 N 70.33251582 W 149.24158679 5529.07 52.73 55.77 3915.14 3997.99 3325.16 3394.73 3358.27 1820.25 2822.17 0.85 5971814.85 593555.70 N 70.33263324 W 149.24108177 5624.94 52.76 55.14 3973.17 4056.02 3400.36 3471.04 3434.54 1863.52 2885.02 0.52 5971858.87 593618.02 N 70.33275138 W 149.24057184 5720.14 52.43 54.10 4031.00 4113.85 3474.69 3546.66 3510.09 1907.31 2946.68 0.93 5971903.39 593679.14 N 70.33287093 W 149.24007160 5815.15 52.69 53.75 4088.76 4171.61 3548.66 3622.10 3585.41 1951.73 3007.65 0.40 5971948.54 593739.56 N 70.33299222 W 149.23957692 5910.82 52.83 53.54 4146.66 4229.51 3623.27 3698.26 3661.45 1996.88 3068.99 0.23 5971994.43 593800.34 N 70.33311549 W 149.23907924 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P61\V-122PB1 Generated 1/18/2007 1:24 PM Page 2 of 4 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 6UU6.44 5Z .3b b3.11 4ZV4./4 4Lt5/.b`J 3by/.bV 3//4 .ZZ 3/J/. Z5 ZU4L. Z4 JIL`J. `JI V.bl b`J/LV4U AL 6101 .92 52 .79 53.46 4262.77 4345.62 3771.78 3850. 05 3812. 93 2087. 57 3190. 69 0.54 5972086. 58 6197 .56 52 .37 53.52 4320.88 4403.73 3846.15 3926. 00 3888. 77 2132. 77 3251. 74 0.44 5972132. 50 6293 .14 52 .23 53.40 4379.33 4462.18 3920.18 4001. 63 3964. 27 2177. 79 3312. 50 0.18 5972178. 26 6389 .43 52 .20 53.52 4438.33 4521.18 3994.68 4077. 73 4040. 25 2223. 10 3373. 64 0.10 5972224. 30 6485 .12 52 .21 53.24 4496.97 4579.82 4068.69 4153. 34 4115. 75 2268. 21 3434. 33 0.23 5972270. 13 6581 .00 52 .54 53.57 4555.50 4638.35 4143.01 4229. 28 4191. 57 2313. 48 3495. 30 0.44 5972316. 13 6675 .72 52 .84 53.98 4612.92 4695.77 4216.85 4304. 62 4266. 83 2358. 00 3556. 08 0.47 5972361. 38 6771 .66 53 .00 53.50 4670.76 4753.61 4291.86 4381. 16 4343. 28 2403. 27 3617. 79 0.43 5972407. 39 6867 .98 54 .60 55.16 4727.65 4810.50 4368.18 4458. 88 4420. 95 2448. 58 3680. 94 2.17 5972453. 45 6963 .03 58 .27 57.21 4780.20 4863.05 4446.38 4538. 07 4500. 13 2492. 62 3746. 74 4.26 5972498. 28 7060 .04 62 .59 57.60 4828.06 4910.91 4529.95 4622. 42 4584. 47 2538. 05 3817. 81 4.47 5972544. 57 7155 .89 65 .52 55.13 4869.99 4952.84 4615.09 4708. 60 4670. 65 2585. 80 3889. 54 3.84 5972593. 18 7250 .97 65 .34 53.47 4909.53 4992.38 4699.98 4795. 07 4757. 06 2636. 26 3959. 76 1.60 5972644. 47 7346 .28 64 .43 51.47 4949.99 5032.84 4784.15 4881. 36 4843. 15 2688. 82 4028. 20 2.13 5972697. 86 7442 .09 63 .47 51.03 4992.06 5074.91 4867.67 4967. 44 4928. 91 2742. 70 4095. 33 1.08 5972752. 54 7536 .64 62 .28 50.16 5035.17 5118.02 4949.09 5051. 59 5012. 66 2796. 11 4160. 35 1.50 5972806. 73 7632 .69 62 .42 49.10 5079.75 5162.60 5031.04 5136. 67 5097. 21 2851. 22 4225. 17 0.99 5972862. 61 7727 .06 62 .43 48.27 5123.43 520628 5111.22 5220. 32 5180. 19 2906. 44 4288. 00 0.78 5972918. 59 7822 .83 62 .41 48.54 5167.77 5250.62 5192.48 5305. 21 5264. 37 2962. 80 4351. 48 0.25 5972975. 70 7918 .81 62 .17 49.77 5212.40 5295.25 5274.12 5390. 18 5348. 78 3018. 37 4415. 76 1.16 5973032. 04 8014 .38 62 .10 50.63 5257.07 5339.92 5355.72 5474. 67 5432. 90 3072. 45 4480. 67 0.80 5973086. 90 8110 .12 62 .46 50.90 5301.61 5384.46 5437.79 5559. 42 5517. 36 3126. 06 4546. 32 0.45 5973141. 29 8206 .44 62 .25 50.27 5346.30 5429.15 5520.34 5644. 74 5602. 37 3180. 23 4612. 23 0.62 5973196. 25 8302 .03 62 .27 50.70 5390.79 5473.64 5602.15 5729. 35 5686. 67 3234. 06 4677. 50 0.40 5973250. 86 8397 .65 62 .33 51.12 5435.24 5518.09 5684.18 5814. 01 5771. 08 3287. 45 4743. 21 0.39 5973305. 03 8493 .23 60 .63 55.10 5480.89 5563.74 5766.26 5897. 98 5854. 97 3337. 86 4810. 34 4.07 5973356. 25 8588 .45 57 .99 60.75 5529.51 5612.36 5847.42 5979. 84 5936. 71 3381. 36 4879. 65 5.81 5973400. 58 8684 .80 56 .51 66.85 5581.67 5664.52 5928.36 6060. 85 6016. 81 3417. 14 4952. 29 5.54 5973437 23 8779 .83 54 .74 73.40 5635.36 5718.21 6006.44 6139. 25 6092. 64 3443. 82 5025. 96 5.98 5973464. 80 8875 .57 55 .12 76.04 5690.38 5773.23 6083.72 6217. 60 6166. 71 3464. 47 5101. 54 2.29 5973486. 36 8970 .90 54 .99 79.41 5744.99 5827.84 6159.99 6295. 74 6239. 26 3481. 08 5177. 88 2.90 5973503. 89 9066 .76 55 .19 81.94 5799.86 5882.71 6235.75 6374. 34 6310. 81 3493. 81 5255. 44 2.17 5973517. 56 9162 .32 54 .40 85.25 5854.96 5937.81 6309.84 6452. 42 6380. 34 3502. 53 5333. 01 2.95 5973527. 21 9257 .90 51 .67 86.36 5912.43 5995.28 6381.33 6528. 78 6447. 18 3508. 13 5409. 17 3.00 5973533. 73 9354 .31 49 .39 89.25 5973.72 6056.57 6450.05 6603. 19 6511. 23 3511. 01 5483. 52 3.31 5973537. 51 9449 .03 48 .95 93.69 6035.67 6118.52 6514.31 6674. 85 6570. 68 3509. 18 5555. 13 3.58 5973536. 55 9540 .43 48 .98 100.03 6095.71 6178.56 6572.95 6743. 76 6624. 24 3500. 95 5623. 52 5.23 5973529. 15 9635 .91 47 .20 107.01 6159.52 6242.37 6628.69 6814. 77 6674. 29 3484. 42 5692. 53 5.75 5973513. 46 9731 .84 46 .68 117.47 6225.12 6307.97 6676.38 6884. 77 6715. 92 3457. 99 5757. 24 7.98 5973487. 81 9827 .40 48 .32 124.50 6289.72 6372.57 6715.93 6955. 18 6749. 22 3421. 72 5817. 54 5.69 5973452. 27 5`J3i5bU. / 1 IV / V.SS3L3`J3b VV 14y.L3ZSb234`Jb 593920.93 N 70.33336313 W 149.23809178 593981.43 N 70.33348652 W 149.23759642 594041.63 N 70.33360945 W 149.23710342 594102.21 N 70.33373315 W 149.23660731 594162.35 N 70.33385630 W 149.23611487 594222.76 594282.99 594344.15 594406.73 594471.99 594542.50 594613.64 594683.24 594751.03 594817.50 N 70.33397990 W 149.2356201:6 N 70.33410145 W 149.23512701 N 70.33422504 W 149.23462622 N 70.33434874 W 149.23411383 N 70.33446896 W 149.233579 8 N 70.33459299 W 149.2330 N 70.33472334 W 149.23242112 N 70.33486108 W 149.23185130 N 70.33500458 W 149.23129594 N 70.33515166 W 149.23075115 594881.86 N 70.33529749 W 149.23022346 594946.00 N 70.33544794 W 149.22969739 595008.15 N 70.33559871 W 149.22918747 595070.95 N 70.33575256 W 149.22867222 595134.54 N 70.33590428 W 149.22815053 595198.79 N 70.33605192 W 149.22762370 595263.77 N 70.33619826 W 149.22709090 595329.02 N 70.33634615 W 149.22655588 595393.63 N 70.33649310 W 149.22602613 595458.68 N 70.33663882 W 149.22549278 595525.19 N 70.33677643 W 149.22494791 595593.96 N 70.33689514 W 149.22438544 595666.15 N 70.33699276 W 149.2237 595739.50 N 70.33706553 W 1492231 595814.81 N 70.33712179 W 149.22258485 595890.94 N 70.33716702 W 149.22196546 595968.33 N 70.33720166 W 149.22133616 596045.79 N 70.33722533 W 14922070677 596121.86 N 70.33724048 W 149.22008892 596196.16 N 70.33724820 W 14921948573 596267.79 N 70.33724306 W 149.21890475 596336.26 N 70.33722045 W 149.21835002 596405.46 N 70.33717514 W 149.21779020 596470.49 N 70.33710279 W 149.21726538 596531.21 N 70.33700357 W 14921677643 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P61\V-122P61 Generated 1/18/2007 1:24 PM Page 3 of 4 Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 9922 .63 49.00 128. 39 6352. 63 6435. 48 6750. 33 7026 .67 6777. 56 337925 5875. 03 3.15 5973410.50 10017 .92 50.26 132. 75 6414. 37 6497. 22 6780. 59 7099 .25 6802. 13 3332.03 5930. 13 3.73 5973363 .96 10114 .26 50.93 136. 05 6475. 54 6558. 39 6807. 04 7173 .68 6823. 34 3279.96 5983. 30 2.74 5973312 .54 10210 .14 53.43 139. 80 6534. 34 6617. 19 6829. 52 7249 .41 6841. 17 3223.73 6034. 00 4.04 5973256 .94 10305 .43 55.40 139. 50 6589. 79 6672. 64 6850. 34 7326 .90 6858. 01 3164.68 6084. 17 2.08 5973198 .50 10400.69 55.36 141.18 6643.91 6726.76 6870.48 7405.29 6874.98 3104.33 6134.20 1.45 5973138.77 10496.74 55.35 141.06 6698.51 6781.36 6889.74 7484.31 6891.89 3042.82 6183.80 0.10 5973077.86 10592.59 54.50 140.83 6753.59 6836.44 6909.10 7562.75 6909.76 2981.90 6233.23 0.91 5973017.56 Last MWD+IFR+MS 10616.58 54.04 141.74 6767.60 6850.45 6913.79 7582.23 6914.22 2966.71 6245.41 3.63 5973002.51 TD (Projected) 10685.00 54.04 141.74 6807.78 6890.63 6926.71 7637.61 6926.75 2923.22 6279.70 0.00 5972959.45 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gy ro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is appl ied to enhance inclination accuracy. ) Legal Descriation: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 4711 FSL 1546 FEL S11 Ti 1 N R11 E UM 5969960.76 590756.02 BHL : 2351 FSL 544 FEL Si T11 N R11 E UM 5972959.45 596999.32 596589.20 N 70.33688742 W 149.21631033 596644.87 N 70.33675832 W 149.21586359 596698.65 N 70.33661593 W 149.21543263 596750.03 N 70.33646222 W 149.21502168 596800.91 N 70.33630078 W 14921461503 596851.66 N 70.33613580 W 14921420957 596902.00 N 70,33596764 W 149.21380761 596952.15 N 70.33580112 W 149.21340709 596964.51 N 70.33575958 W 149.21330838 596999.32 N 70.33564070 W 149.21303048 ~, r, SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122PB1\V-122P61 Generated 1/18/2007 1:24 PM Page 4 of 4 Co t~RL ~-r-~ D V-122PB2 Su Report Date: 30-Dec-O6 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: V-Pad /Plan V-122 (S-U) Well: V-122 Borehole: V-122P62 UWI/API#: 500292332871 Survey Name /Date: V-122P62 /December 30, 2006 Tort /AHD / DDI / ERD ratio: 449.231 ° / 10823.44 ft / 6.999 / 1,608 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LatlLong: N 70.32766191, W 149.26397215 Location Grid NIE Y/X: N 5969960.760 ftUS, E 590756.020 ftUS Grid Convergence Angle: +0.69307258° Grid Scale Factor: 0.99990936 ~~ ~ ~~ i'7,r„ ii1~ ui u. I ~ c. ;h~ 'uLL $ „rwJ `` '~i Report Vertical Section Azimuth: 156.530° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 82.85 ft relative to MSL Sea Bed /Ground Level Elevation: 55.15 ft relative to MSL Magnetic Declination: 23.833° Total Field Strength: 57630.911 nT Magnetic Dip: 80.885° Declination Date: December 28, 2006 Magnetic Declination Model: BGGM 2006 North Reference: True North . Total Corr Mag North •> True North: +23.833° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n n n ft ft ft ft de 100 ft ftUS ftUS Nlt U.UU u u -25Z.tfb v V u u u u u oaeaanu./n oyu/oo.uc iv /u.az/ooiai vv 14~.LOJ~/LIO First GYD GC SS 100.00 0.32 36.37 17.15 100 -0.14 0.28 0.28 0.22 0.17 0.32 5969960.99 590756.18 N 70.32766253 W 149.26397081 173.00 0.29 26.16 90.15 173 -0.36 0.67 0.67 0.55 0.37 0.08 5969961.32 590756.38 N 70.32766343 W 149.26396917 266.00 0.72 75.06 183.14 265.99 -0.43 1.45 1.38 0.92 1.04 0.62 5969961.69 590757.05 N 70.32766442 W 149.26396375 360.00 1.75 66.17 277.12 359.97 -0.35 3.47 3.35 1.65 2.92 1.11 5969962.44 590758.92 N 70.32766642 W 149.26394847 447.00 3.46 12.36 364.04 446.89 -2.49 7.17 6.68 4.75 4.7 3.23 5969965.57 590760.66 N 70.32767489 W 149.26393406 540.00 4.84 2.62 456.79 539.64 -8.29 13.88 12.66 11.41 5.48 1.66 5969972.24 590761.36 N 70.32769309 W 149.26392773 630.00 6.98 13.67 546.31 629.16 -16.06 23.12 21.66 20.52 6.94 2.68 5969981.36 590762.71 N 70.32771797 W 149.26391584 723.00 7.84 42.75 638.57 721.42 -23.12 34.86 33.15 30.67 12.59 4.09 5969991.58 590768.23 N 70.32774570 W 149.26387008 Last GYD GC SS 814.00 9.52 59.81 728.54 811.39 -26.51 48.5 45.45 39.02 23.31 3.36 5970000.05 590778.85 N 70.32776850 W 149.26378315 First MWD+IFR+MS 851.12 10.87 63.04 765.07 847.92 -27.08 55.06 51.21 42.15 29.08 3.95 5970003.25 590784.59 N 70.32777705 W 149.2637 943.72 12.86 65.33 855.69 938.54 -27.83 74.1 68.4 50.41 46.23 2.21 5970011.72 590801.63 ' N 70.32779962 W 149.263 1039.7 16.7 65.96 948.48 1031.33 -28.19 98.58 91.41 60.49 68.54 4 5970022.07 590823.81 N 70.32782716 W 149.26341 1135.17 20.86 65.69 1038.84 1121.69 -28.57 129.31 121.1 73.08 96.57 4.36 5970034.99 590851.69 N 70.32786155 W 149.26318907 1229.99 24.24 65.16 1126.4 1209.25 -29.28 165.67 156.79 88.21 129.63 3.57 5970050.52 590884.56 N 70.32790289 W 149.26292100 1325.37 27.08 66.48 1212.37 1295.22 -29.77 206.96 197.58 105.1 167.31 3.04 5970067.87 590922.03 N 70.32794903 W 149.26261543 1421.67 29.33 67.94 1297.23 1380.08 -29.21 252.47 242.6 122.71 209.27 2.44 5970085.98 590963.77 N 70.32799714 W 149.26227514 1517.4 32.3 73.7 1379.45 1462.3 -25.44 301.48 290.78 138.7 255.57 4.37 5970102.53 591009.87 N 70.32804082 W 149.26189969 1613.89 35.33 75.23 1459.61 1542.46 -18 355.17 343.31 153.05 307.31 3.26 5970117.5 591061.42 N 70.32808002 W 149.26148017 1707.5 39.74 79.42 1533.84 1616.69 -7.22 412.17 398.86 165.46 362.93 5.44 5970130.58 591116.89 N 70.32811390 W 149.26102911 1802.51 41.22 79.01 1606.1 1688.95 6.32 473.84 459.01 177 423.52 1.58 5970142.85 591177.32 N 70.32814543 W 149.26053780 1900.86 43.47 76.05 1678.8 1761.65 18.92 540.08 524.33 191.34 488.17 3.06 5970157.97 591241.8 N 70.32818458 W 149.26001347 1996.78 45.35 72.41 1747.32 1830.17 27.87 607.19 591.14 209.61 552.74 3.3 5970177.02 591306.13 N 70.32823448 W 149.25948991 2091.44 47.1 67.15 1812.83 1895.68 31.7 675.51 659.44 233.26 616.81 4.42 5970201.44 591369.91 N 70.32829908 W 149.25897029 2187.31 49.42 61.79 1876.68 1959.53 29.07 747.02 730.69 264.12 681.29 4.82 5970233.07 591434 N 70.32838337 W 149.25844742 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P62\V-122P62 Generated 4/10/2007 1:27 PM Page 1 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de n n n n ft ft ft de 100 ft ftUS ftUS C'L253.JC 5'L./L 5/.tS4 ly3/.14 LUl`J.`J`J LV.Lb tSLl.t54 tSV4.bJ 3U1,/25 /4J.`JL 4.b`J 5`J/UC/I.JI JyI~Vy6.l/ IV /V. 3LZ346bLJ VV 14y,LJ/`JL3C/ 2378.4 52.42 57.56 1994.81 2077.66 8.7 897.19 878.89 342.04 809.61 0.39 5970312.54 591561.35 N 70. 32859622 W 149.25740679 2474.64 51.15 54.26 2054.36 2137.21 -5.22 972.79 953.17 384.4 872.22 3 5970355.64 591623.45 N 70. 32871191 W 149.25689898 2569.81 50.6 54.69 2114.41 2197.26 -20.64 1046.62 1025,56 427.3 932.31 0.68 5970399.26 591683 N 70. 32882909 W 149.25641167 2665.17 52.12 52.59 2173.96 2256.81 -37.26 1121.1 1098.58 471.46 992.27 2.34 5970444.14 591742.43 N 70. 32894972 W 149.25592533 2761.41 52.25 52.49 2232.96 2315.81 -55.64 1197.13 1173.04 517,7 1052.62 0.16 5970491.11 591802.21 N,70. 32907603 W 149.25543587 2857.23 52 52.65 2291.79 2374.64 -73.89 1272.76 1247.32 563.67 1112.69 .0.29 5970537.8 591861.7 N 70. 32920159 W 149,25494874 2952.79 51.74 52.92 2350.79 2433.64 -91.75 1347.93 1321.33 609.14 1172.55 0.35 5970583.98 591921.01 N 70. 32932577 W 149.25446323 3049.37 51.51 53.39 2410.75 2493.6 -109.27 1423.65 1396.09 654.54 1233.14 0.45 5970630.11 591981.04 N 70. 32944978 W 149.25397180 3145.19 53.19 53.61 2469.28 2552.13 -126.37 1499.51 1471.15 699.66 1294.12 1.76 5970675.96 592041.47 N 70. 32957303 W 149.25347717 3239.79 52.51 53.51 2526.41 2609.26 -143.29 1574.91 1545.85 744.45 1354.78 0.72 5970721.47 592101.57 N 70. 32969535 W 149.25298518 3335.72 52.06 54.15 2585.09 2667.94 -159.98 1650.8 1621.13 789.24 1416.04 0.71 5970766.99 592162.28 N 70. 32981767 W 149.2524 3431,23 54.46 54.37 2642.22 2725.07 -176.24 1727.33 1697.18 833.94 1478.16 2.52 5970812.44 592223.85 N 70. 32993976 W 149.2519 3527.24 54.3 54.59 2698.14 2780.99 -192.53 1805.38 1774.8 879.28 1541.69 0.25 5970858.54 592286.81 N 70. 33006360 W 149.25146922 3589.94 53.61 54.05 2735.03 2817.88 -203.25 1856.07 1825.23 908.85 1582.87 1.3 5970888.6 592327,63 N 70. 33014436 W 149.25113520 3708.88 52.59 53.69 2806.44 2889,29 -224.1 1951.19 1919.8 964.93 1659.69 0.89 5970945.6 592403.76 N 70. 33029751 W 149.25051208 3805.2 52.55 53.96 2864.99 2947.84 -240.92 2027.67 1995.89 1010.08 1721.43 0.23 5970991.49 592464.95 N 70. 33042081 W 149.25001127 3900.17 52.65 55.33 2922.67 3005.52 -256.46 2103.12 2071.06 1053.73 1782.96 1.15 5971035.88 592525.94 N 70. 33054003 W 149.24951217 3998.55 52.62 55.11 2982.38 3065.23 -271.79 2181.31 2149.05 1098.33 1847.18 0.18 5971081.25 592589.61 N 70. 33066184 W 149.24899124 4087.73 52.82 53.83 3036.4 3119.25 -286.62 2252.27 2219.76 1139.57 1904.93 1.16 5971123.18 592646.85 N 70. 33077445 W 149.24852283 4183.81 52.86 53.01 3094.43 3177.28 -303.98 2328.84 2295.97 1185.2 1966.41 0.68 5971169.55 592707.77 N 70. 33089907 W 149,24802406 4278.82 52.92 51.95 3151.76 3234.61 -322.38 2404.61 2371.27 1231.34 2026.51 0.89 5971216.41 592767.3 N 70. 33102509 W 149.24753659 4375.01 52.97 51.96 3209.72 3292.57 -341.7 2481.37 2447.52 1278.65 2086.96 0.05 5971264.44 592827.17 N 70. 33115429 W 149,24704618 4470.18 52.03 51,48 3267.66 3350.51 -360.99 2556.87 2522.51 1325.43 2146.23 1.07 5971311.92 592885.86 N 70. 33128202 W 149.24656537 4565.47 52.27 51.69 3326.13 3408.98 -380.4 2632.12 2597.25 1372.18 2205.19 0.31 5971359.38 592944.24 N 70. 33140970 W 149.24608711 4660.63 52.62 52.48 3384.13 3466.98 -399.22 2707.55 2672.29 1418.53 2264.7 0.75 5971406.45 593003.19 N 70. 33153629 W 149.24560429 4762.44 52.25 53.22 3446.2 3529.05 -418.3 2788.26 2752.68 1467.27 2329.02 0.68 5971455.96 593066.91 N 70. 33166937 W 149.24508249 4858.64 52.25 53.84 3505.09 3587.94 -435.41 2864.32 2828.54 1512.48 2390.19 0.51 5971501.9 593127.52 N 70. 33179284 W 149.24458627 4954.11 52.52 54.44 3563.36 3646.21 -451.64 2939.94 2904.02 1556.78 2451.48 0.57 5971546.93 593188.27 N 70. 33191381 W 149.24408905 5049.7 52.23 54.33 3621.72 3704.57 -467.57 3015.65 2979.61 1600.87 2513.03 0.32 5971591.76 593249.27 N 70. 33203420 W 149.2435 5145.96 52.17 54.19 3680.72 3763.57 -483.73 3091.71 3055.56 1645.3 2574.77 0.13 5971636.93 593310,46 N 70. 33215551 W 149.24308889 5241.7 52.02 54.53 3739.54 3822.39 -499.66 3167.26 3130.99 1689.31 2636.16 0.32 5971681.68 593371.31 N 70. 33227571 W 149.24259083 5337.86 52.38 54.47 3798.48 3881.33 -515.49 3243.24 3206.88 1733.44 2698.02 0.38 5971726.54 593432.62 N 70. 33239619 W 149.24208899 5433.69 52.25 54.95 3857.06 3939.91 -531.03 3319.07 3282.65 1777.25 2759.92 0.42 5971771.1 593493.98 N 70. 33251582 W 149.24158679 5529.07 52.73 55.77 3915.14 3997.99 -545.68 3394.73 3358.27 1820.25 2822.17 0.85 5971814.85 593555.7 N 70. 33263324 W 149.24108177 5624.94 52.76 55.14 3973.17 4056.02 -560.34 3471.04 3434.54 1863.52 2885.02 0,52 5971858.87 593618.02 N 70. 33275138 W 149.24057184 5720.14 52.43 54.1 4031 4113.85 -575.94 3546.66 3510.09 1907.31 2946.68 0.93 5971903.39 593679.14 N 70. 33287093 W 149.24007160 5815.15 52.69 53.75 4088.76 4171.61 -592.41 3622.1 3585.41 1951.73 3007.65 0.4 5971948.54 593739.56 N 70. 33299222 W 149.23957692 5910.82 52.83 53.54 4146.66 4229.51 -609.39 3698.26 3661.45 1996.88 3068.99 0.23 5971994.43 593800.34 N 70. 33311549 W 149.23907924 6006.44 52.36 53.11 4204.74 4287.59 -626.74 3774.22 3737.25 2042.24 3129.91 0.61 5972040.52 593860.71 N 70. 33323936 W 149.23858496 6101.92 52.79 53.46 4262.77 4345.62 -644.11 3850.05 3812.93 2087.57 3190.69 0.54 5972086.58 593920.93 N 70. 33336313 W 149.23809178 6197.56 52.37 53.52 4320.88 4403.73 -661.25 3926 3888.77 2132.77 3251.74 0.44 5972132.5 593981.43 N 70. 33348652 W 149.23759642 6293.14 52.23 53.4 4379.33 4462.18 -678.35 4001.63 3964.27 2177,79 3312.5 0.18 5972178.26 594041.63 N 70. 33360945 W 149.23710342 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122PB2\V-122P62 Generated 4/10/2007 1:27 PM Page 2 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS (1389.43 51.1 5:i.5L 44;itS.:t:i 4bL7.18 -EiyS.b(i 4U//./:i 4U4U.15 11"L;i.l 6485.12 52.21 53.24 4496.97 4579.82 -712.77 4153.34 4115.75 2268.21 6581 6675.72 6771.66 6867.98 6963.03 7060.04 7155.89 7250.97 7346.28 7442.09 7536.64 7632.69 7727.06 7822.83 7918.81 8014.38 8110.12 8206.44 8302.03 8397.65 8493.23 8588.45 8684.8 8779.83 8875.57 52.54 52.84 53 54.6 58.27 62.59 65.52 65.34 64.43 63.47 62.28 62.42 62.43 62.41 62.17 62.1 62.46 62.25 62.27 62.33 60.63 57.99 56.51 54.74 55.12 53.57 53.98 53.5 55.16 57.21 57.6 55.13 53.47 51.47 51.03 50.16 49.1 48.27 48.54 49.77 50.63 50.9 50.27 50.7 51.12 55.1 60.75 66.85 73.4 76.04 8970.9 54.99 79.41 9066.76 55.19 81.94 9162.32 54.4 85.25 9257.9 51.67 86.36 9354.31 49.39 89.25 9449.03 48.95 93.69 9540.43 48.98 100.03 9635.91 47.2 107.01 9731.84 46.68 117.47 9827.4 48.32 124.5 9922.63 49 128.39 10017.92 50.26 132.75 10114.26 50.93 136.05 10210.14 53.43 139.8 Tie-In Survey 10305.43 55.40 139.50 4555.5 4612.92 4670.76 4727.65 4780.2 4828.06 4869.99 4909.53 4949.99 4992.06 5035.17 5079.75 5123.43 5167.77 5212.4 5257.07 5301.61 5346.3 5390.79 5435.24 5480.89 5529.51 5581.67 5635.36 5690.38 5744.99 5799.86 5854.96 5912.43 5973.72 6035.67 6095.71 6159.52 6225.12 6289.72 6352.63 6414.37 6475.54 6534.34 6589.79 4638.35 -730.01 4695.77 -746.64 4753.61 -763.59 4810.5 -780 4863.05 -794.19 4910.91 -807.56 4952.84 -822.79 4992.38 -841.11 5032.84 -862.07 5074.91 -884.75 5118.02 -907.85 5162.6 -932.58 5206.28 -958.21 5250.62 -984.62 5295.25 -1010 5339.92 -1033.75 5384.46 -1056.78 5429.15 -1080.22 5473.64 -1103.6 5518.09 -1126.4 5563.74 -1145.9 5612.36 -1158.2 5664.52 -1162.09 5718.21 -1157.23 5773.23 -1146.06 5827.84 -1130.9 5882.71 -1111.69 5937.81 -1088.79 5995.28 -1063.6 6056.57 -1036.63 6118.52 -1006.43 6178.56 -971.65 6242.37 -928.99 6307.97 -878.98 6372.57 -821.69 6435.48 -759.84 6497.22 -694.58 6558.39 -625.64 6617.19 -553.87 6672.64 -479.72 4229.28 4304.62 4381.16 4458.88 4538.07 4622.42 4708.6 4795.07 4881.36 4967.44 5051.59 5136.67 5220.32 5305.21 5390.18 5474.67 5559.42 5644.74 5729.35 5814.01 5897.98 5979.84 6060.85 6139.25 6217.6 4191.57 4266.83 4343.28 4420.95 4500.13 4584.47 4670.65 4757.06 4843.15 4928.91 5012.66 5097.21 5180.19 5264.37 5348.78 5432.9 5517.36 5602.37 5686.67 5771.08 5854.97 5936.71 6016.81 6092.64 6166.71 6295.74 6239.26 6374.34 6310.81 6452.42 6380.34 6528.78 6447.18 6603.19 6511.23 6674.85 6570.68 6743.76 6624.24 6814.77 6674.29 6884.77 6715.92 6955.18 6749.22 7026.67 6777.56 7099.25 6802.13 7173.68 6823.34 7249.41 6841.17 7326.90 6858.01 2313.48 2358 2403.27 2448.58 2492.62 2538.05 2585.8 2636.26 2688.82 2742.7 2796.11 2851.22 2906.44 2962.8 3018.37 3072.45 3126.06 3180.23 3234.06 3287.45 3337.86 3381.36 3417.14 3443.82 3464.47 3481.08 3493.81 3502.53 3508.13 3511.01 3509.18 3500.95 3484.42 3457.99 3421.72 3379.25 3332.03 3279.96 3223.73 3164.68 33/3.b4 U.1 S9/11"14.3 5941UL.11 N /U.333/3:i15 VV 149.13tibU/31 3434.33 0.23 5972270.13 594162.35 N 70.33385630 W 149.23611487 3495.3 0.44 5972316.13 594222.76 N 70.33397990 W 149.23562016 3556.08 0.47 5972361.38 594282.99 N 70.33410145 W 149.23512701 3617.79 0.43 5972407.39 594344.15 N 70.33422504 W 149.23462622 3680.94 2.17 5972453.45 594406.73 N 70.33434874 W 149.23411383 3746.74 4.26 5972498.28 594471.99 N 70.33446896 W 149.23357988 3817.81 4.47 5972544.57 594542.5 N 70.33459299 W 149.23300318 3889.54 3.84 5972593.18 594613.64 N 70.33472334 W 149.23242112 3959.76 1.6 5972644.47 594683.24 N 70.33486108 W 149.23185130 4028.2 2.13 5972697.86 594751.03 N 70.33500458 W 149.231295 4 4095.33 .1.08 5972752.54 594817.5 N 70.33515166 W 149.2307 4160.35 1.5 5972806.73 594881.86 N 70.33529749 W 149.23022346 4225.17 0.99 5972862.61 594946 N 70.33544794 W 149.22969739 4288 0.78 5972918.59 595008.15 N 70.33559871 W 149.22918747 4351.48 0.25 5972975.7 595070.95 N 70.33575256 W 149.22867222 4415.76 1.16 5973032.04 595134.54 N 70.33590428 W 149.22815053 4480.67 0.8 5973086.9 595198.79 N 70.33605192 W 149.22762370 4546.32 0.45 5973141.29 595263.77 N 70.33619826 W 149.22709090 4612.23 0.62 5973196.25 595329.02 N 70.33634615 W 149.22655588 4677.5 0.4 5973250.86 595393.63 N 70.33649310 W 149.22602613 4743.21 0.39 5973305.03 595458.68 N 70.33663882 W 149.22549278 4810.34 4.07 5973356.25 595525.19 N 70.33677643 W 149.22494791 4879.65 5.81 5973400.58 595593.96 N 70.33689514 W 149.22438544 4952.29 5.54 5973437.23 595666.15 N 70.33699276 W 149.22379598 5025.96 5.98 5973464.8 595739.5 N 70.33706553 W 149.22319811 5101.54 2.29 5973486.36 595814.81 N 70.33712179 W 149.22258485 5177.88 2.9 5973503.89 595890.94 N 70.33716702 W 149.22196546 5255.44 2.17 5973517.56 595968.33 N 70.33720166 W 149.221 5333.01 2.95 5973527.21 596045.79 N 70.33722533 W 149.220 5409.17 3 5973533.73 596121.86 N 70.33724048 W 149.22008892 5483.52 3.31 5973537.51 596196.16 N 70.33724820 W 1 49 21 948573 5555.13 3.58 5973536.55 596267.79 N 70.33724306 W 149.21890475 5623.52 5.23 5973529.15 596336.26 N 70.33722045 W 149.21835002 5692,53 5.75 5973513.46 596405.46 N 70.33717514 W 149.21779020 5757.24 7.98 5973487.81 596470.49 N 70.33710279 W 149.21726538 5817.54 5.69 5973452.27 596531.21 N 70.33700357 W 149.21677643 5875.03 3.15 5973410.5 5965892 N 70.33688742 W 149.21631033 5930.13 3.73 5973363.96 596644.87 N 70.33675832 W 149.21586359 5983.3 2.74 5973312.54 596698.65 N 70.33661593 W 149.21543263 6034 4.04 5973256.94 596750.03 N 70.33646222 W 149.21502168 6084.17 2.08 5973198.50 596800.91 N 70.33630078 W 1 4921 461 503 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P62\V-122P62 Generated 4/10/2007 1:27 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea NO ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de tt n ft ft ft tt ft de 100 ft ftUS ttUS Top Whipstock (t3lind) 10311.00 55.40 13y.(iU Ei5y1.y5 fifi/5.k5U -4/5.:14 /331.425 titf5y.U4 31ti1.1 `J bU25 /.15 1.415 5y/;il y5.U5 5`Jbi3U:i. yL IV /U.33bLy1 L4 VV 14`J.L145`JV`JL Base Whipstock (Blind) 10323.00 57.25 140.19 6599.60 6682.45 -465.77 7341.47 6861.24 3153.55 6093.58 15.95 5973187.49 596810. 45 N 70.33627036 W 149.21453879 Inc + Trend 10342.17 57.74 141.09 6609.90 6692.75 -450.22 7357.64 6864.62 3141.05 6103.83 4.71 5973175.11 596820. 85 N 70.33623619 W 149.21445570 Inc + Trend 10374.17 65.05 142.60 6625.22 6708.07 -423.06 7385.71 6869.98 3118.97 6121.17 23.22 5973153.24 596838. 45 N 70.33617582 W 149.21431523 First MWD+IFR+MS 10406.26 72.13 144.12 6636.92 6719.77 -393.99 7415.57 6875.03 3095.00 6138.98 22.50 5973129.50 596856. 54 N 70.33611032 W 149.21417092 10437.61 78.53 144.60 6644.86 6727.71 -364.35 7445.88 6879.78 3070.37 6156.64 20.47 5973105.08 596874. 50 N 70.33604298 W 149.21402781 10469.18 86.09 143.46 6649.08 6731.93 -333.83 7477.14 6884.99 3045.07 6175.00 24.21 5973080.01 596893. 17 N 70.33597382 W 149.21387900 10493.55 92.17 141.68 6649.45 6732.30 -310.20 7501.50 6889.75 3025.73 6189.80 25.99 5973060.85 596908. 20 N 70.33592095 W 149.21375904 10524.44 92.40 145.67 6648.22 6731.07 -280.11 7532.37 6895.33 3000.87 6208.09 12.93 5973036.21 596926. 78 N 70.33585299 W 149.21361092 10556.83 93.08 148.57 6646.67 6729.52 -248.20 7564.72 6899.39 2973.70 6225.65 9.19 5973009.26 596944. 67 N 70.33577873 W 149.21346863 10588.04 95.09 151.60 6644.44 6727.29 -217.27 7595.85 6901.84 2946.72 6241.17 11.63 5972982.48 596960. 52 N 70.33570499 W 149.213342 9 10620.18 95.40 153.80 6641.51 6724.36 -185.34 7627.85 6903.04 2918.28 6255.85 6.88 5972954.22 596975. 54 N 70.33562727 W 149.213 10652.66 95.50 157.03 6638.42 6721.27 -153.02 7660.19 6902.88 2888.88 6269.30 9.90 5972924.99 596989. 34 N 70.33554692 W 149.2131 10684.26 95.57 161.69 6635.37 6718.22 -121.61 7691.64 6900.70 2859.46 6280.38 14.68 5972895.71 597000. 78 N 70.33546651 W 149.21302538 10715.63 94.51 164.46 6632.61 6715.46 -90.57 7722.89 6896.66 2829.57 6289.48 9.42 5972865.93 597010. 23 N 70.33538483 W 149.21295180 10747.75 94.66 167.40 6630.05 6712.90 -58.99 7754.90 6891.09 2798.51 6297.26 9.14 5972834.97 597018. 39 N 70.33529998 W 149.21288888 10779.78 95.36 171.06 6627.25 6710.10 -27.86 7786.81 6883.88 2767.17 6303.22 11.59 5972803.71 597024. 73 N 70.33521434 W 149.21284073 10811.00 94.98 175.31 6624.43 6707.28 1.92 7817.90 6874.92 2736.31 6306.91 13.61 5972772.90 597028. 79 N 70.33513001 W 149.21281102 10844.32 94.52 179.07 6621.67 6704.52 32.98 7851.11 6863.28 2703.15 6308.54 11.33 5972739.76 597030. 82 N 70.33503942 W 149.21279805 10876.14 94.78 180.21 6619.09 6701.94 62.15 7882.82 6851.04 2671.43 6308.74 3.66 5972708.05 597031. 40 N 70.33495278 W 149.21279665 10907.60 94.70 180.79 6616.49 6699.34 90.80 7914.18 6838.62 2640.08 6308.46 1.85 5972676.71 597031. 51 N 70.33486713 W 149.21279908 10939.49 94.95 179.79 6613.81 6696.66 119.88 7945.95 6826.27 2608.31 6308.30 3.22 5972644.93 597031. 73 N 70.33478032 W 149.21280060 10972.49 95.15 180.25 6610.91 6693.76 150.03 7978.83 6813.77 2575.43 6308.29 1.52 5972612.07 597032. 12 N 70.33469052 W 149.21280092 11004.31 93.45 178.65 6608.52 6691.37 179.25 8010.55 6802.12 2543.71 6308.60 7.33 5972580.35 597032. 81 N 70.33460385 W 149.21279866 11035.97 92.07 178.57 6607.00 6689.85 208.56 8042.18 6791.08 2512.09 6309.36 4.37 5972548.75 597033. 95 N 70.33451748 W 149.21279266 11067.53 91.92 178.93 6605.90 6688.75 237.76 8073.72 6780.11 2480.56 6310.05 1.24 5972517.23 597035. 02 N 70.33443133 W 149.21278729 11099.39 91.89 179.03 6604.84 6687.69 267.19 8105.56 6769.06 2448.72 6310.62 0.33 5972485.40 597035. 98 N 70.33434435 W 149.21278291 11131.67 91.93 179.16 6603.76 6686.61 296.98 8137.82 6757.93 2416.47 6311.13 0.42 5972453.16 597036. 88 N 70.33425623 W 149.21277900 11163.31 91.76 179.68 6602.74 6685.59 326.11 8169.45 6746.99 2384.84 6311.45 1.73 5972421.55 597037. 58 N 70.33416984 W 149.21277662 11195.00 91.68 180.08 6601.79 6684.64 355.19 8201.12 6735.92 2353.17 6311.52 1.29 5972389.88 597038. 03 N 70.33408330 W 149.2127 11226.90 92.89 180.00 6600.52 6683.37 384.42 8233.00. 6724.83. 2321.29 6311.49 3.80 5972358.01 597038. 39 N 70.33399622 W 149.21277669 11258.74 91.68 177.76 6599.25 6682.10 413.84 8264.81 6714.50 2289.49 6312.12 7.99 5972326.21 597039. 40 N 70.33390933 W 149.21277186 11291.14 91.21 176.87 6598.43 6681.28 444.12 8297.20 6704.97 2257.13 6313.63 3.11 5972293.88 597041. 31 N 70.33382094 W 149.21275978 11323.04 91.96 177.18 6597.55 6680.40 473.99 8329.09 6695.88 2225.29 6315.29 2.54 5972262.06 597043. 35 N 70.33373394 W 149.21274657 11354.62 90:18 174.77 6596.96 6679.81 503.76 8360.66 6687.57 2193.80 6317.50 9.49 5972230.60 597045. 94 N 70.33364790 W 149.21272881 11386.19 90.72 175.62 6596.71 6679.56 533.67 8392.23 6679.82 2162.34 6320.15 3.19 5972199.18 597048. 97 N 70.33356195 W 149.21270757 11418.27 90.22 173.62 6596.45 6679.30 564.16 8424.31 6672.40 2130.40 6323.16 6.43 5972167.29 597052. 36 N 70.33347470 W 149.21268340 11450.28 90.76 173.81 6596.18 6679.03 594.74 8456.32 6665.64 2098.59 6326.66 1.79 5972135.52 597056. 25 N 70.33338777 W 149.21265519 11481.87 90.76 175.54 6595.76 6678.61 624.76 8487.90 6658.59 2067.14 6329.59 5.48 5972104.11 597059. 56 N 70.33330185 W 149.21263163 11513.81 89.31 172.12 6595.74 6678.59 655.25 8519.84 6652.07 2035.39 6333.02 11.63 5972072.41 597063. 38 N 70.33321511 W 149.21260401 11546.45 89.05 172.33 6596.21 6679.06 686.67 8552.48 6646.45 2003.05 6337.44 1.02 5972040.13 597068. 18 N 70.33312675 W 149.21256842 11577.49 88.13 171.00 6596.97 6679.82 716.62 8583.51 6641.56 1972.35 6341.94 5.21 5972009.49 597073. 05 N 70.33304287 W 149.21253214 11609.64 89.11 168.61 6597.74 6680.59 747.90 8615.65 6637.68 1940.72 6347.63 8.03 5971977.93 597079. 12 N 70.33295645 W 149.21248622 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P62\V-122PB2 Generated 4/10/2007 1:27 PM Page 4 of 6 Comments Measured inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft ft tt ft ft ft ft de 100 ft ftUS ftUS 11 b41.4Z iiii.LU 16b.b25 bbat5.4/ bbt51.3Z //a.1Z t5b4/.4Z bbJJ.4J lava./b bJb4.ba a.bU Ja/ la4/.VD Ja/Vbb AO rv /V.JJCb/ IOG VV 14a.L IG4G~1 ~ 11673.70 86.40 163.54 6599.98 6682.83 811.05 8679.66 6634.78 1878.66 6363.25 8.78 5971916.07 597095.49 N 70.33278687 W 149.21235992 11705.12 89.92 162.08 6600.99 6683.84 842.26 8711.06 6635.26 1848.67 6372.53 12.13 5971886.20 597105.13 N 70.33270491 W 149.21228486 11737.08 87.24 160.66 6601.78 6684.63 874.09 8743.01 6636.70 1818.39 6382.73 9.49 5971856.05 597115.70 N 70.33262218 W 149.21220230 11767.68 89.19 159.89 6602.73 6685.58 904.61 8773.59 6638.81 1789.61 6393.06 6.85 5971827.39 597126.37 N 70.33254351 W 149.21211877 11800.13 91.89 156.46 6602.43 6685.28 937.03 8806.04 6642.39 1759.49 6405.12 13.45 5971797.43 597138.79 N 70.33246121 W 149.21202116 11832.10 92.51 156.98 6601.20 6684.05 968.98 8837.99 6646.87 1730.14 6417.74 2.53 5971768.24 597151.77 N 70.33238101 W 149.21191896 11864.39 89.36 156.72 6600.67 6683.52 1001.26 8870.27 6651.47 1700.46 6430.43 9.79 5971738.72 597164.82 N 70.33229989 W 149.21181623 11896.16 89.14 156.72 6601.09 6683.94 1033.03 8902.04 6656.22 1671.28 6442.99 0.69 5971709.69 597177.73 N 70.33222014 W 149.21171460 11928.54 89.46 156.53 6601.48 6684.33 1065.41 8934.41 6661.27 1641.56 6455.83 1.15 5971680.13 597190.93 N 70.33213892 W 149.21161062 11960.10 89.01 156.47 6601.90 6684.75 1096.96 8965.97 6666.41 1612.62 6468.42 1.44 5971651.35 597203.86 N 70.33205983 W 149.21150876 11991.93 87.78 156.49 6602.80 6685.65 1128.78 8997.79 6671.74 1583.45 6481.12 3.86 5971622.33 597216.91 N 70.33198010 W 149.2114 12023.88 89.15 154.84 6603.65 6686.50 1160.71 9029.72 6677.70 1554.35 6494.28 6.71 5971593.40 597230.42 IJ 70.33190057 W 149.21129945 12055.73 88.70 153.27 6604.25 6687.10 1192.53 9061.57 6684.65 1525.71 6508.21 5.13 5971564.94 597244.70 N 70.33182231 W 149.21118665 12087.64 87.13 151.98 6605.41 6688.26 1224.34 9093.46 6692.53 1497.40 6522.87 6.37 5971536.80 597259.70 N 70.33174492 W 149.21106794 12118.90 87.15 153.66 6606.97 6689.82 1255.49 9124.68 6700.29 1469.62 6537.13 5.37 5971509.21 597274.29 N 70.33166901 W 149.21095247 12150.53 87.78 152.57 6608.37 6691.22 1287.04 9156.28 6708.12 1441.44 6551.42 3.98 5971481.20 597288.92 N 70.33159199 W 149.21083678 12182.77 87.71 152.37 6609.64 6692.49 1319.17 9188.49 6716.59 1412.88 6566.31 0.66 5971452.82 597304.15 N 70.33151391 W 149.21071622 12214.69 86.49 151.28 6611.25 6694.10 1350.94 9220.37 6725.47 1384.77 6581.36 5.12 5971424.91 597319.54 N 70.33143710 W 149.21059434 12246.58 86.58 150.41 6613.18 6696.03 1382.62 9252.20 6734.99 1356.98 6596.87 2.74 5971397.30 597335.38 N 70.33136112 W 149.21046877 12278.39 86.58 150.58 6615.08 6697.93 1414.19 9283.95 6744.80 1329.34 6612.51 0.53 5971369.86 597351.35 N 70.33128559 W 149.21034213 12310.25 86.85 152.39 6616.90 6699.75 1445.88 9315.76 6754.25 1301.39 6627.69 5.73 5971342.10 597366.87 N 70.33120920 W 149.21021918 12341.95 86.46 152.37 6618.75 6701.60 1477.44 9347.41 6763.31 1273.35 6642.36 1.23 5971314.24 597381.88 N 70.33113256 W 149.21010039 12373.69 87.33 151.81 6620.47 6703.32 1509.04 9379.10 6772.68 1245.35 6657.20 3.26 5971286.42 597397.05 N 70.33105602 W 149.20998028 12405.48 87.50 151.74 6621.91 6704.76 1540.69 9410.86 6782.36 1217.36 6672.22 0.58 5971258.62 597412.41 N 70.33097954 W 149.20985867 12437.44 87.12 152.05 6623.41 6706.26 1572.51 9442.78 6792.17 1189.20 6687.26 1.53 5971230.65 597427.78 N 70.33090257 W 14920973690 12470.09 85.35 151.72 6625.55 6708.40 1604.98 9475.36 6802.33 1160.47 6702.61 5.51 5971202.11 597443.48 N 70.33082403 W 149.20961260 12501.79 86.92 152.53 6627.69 6710.54 1636.51 9506.99 6812.19 1132.51 6717.39 5.57 5971174.33 597458.60 N 70.33074762 W 149.20949288 12533.40 86.81 154.34 6629.42 6712.27 1668.03 9538.55 6821.49 1104.28 6731.51 5.73 5971146.28 597473.06 N 70.33067046 W 1492094 12565.73 85.32 154.20 6631.63 6714.48 1700.25 9570:81 ' 6830.67 1075.23 6745.51 4.63 5971117.40 597487.41 N 70.33059105 W 149.209 12597.62 87.85 153.49 6633.53 6716.38 1732.05 9602.64 6840.10 1046.66 6759.54 8.24 5971089.00 597501.78 N 70.33051297 W 149.20915168 12629.91 87.61 150.04 6634.81 6717.66 1764.20 9634.90 6850.90 1018.24 6774.80 10.70 5971060.77 597517.39 N 70.33043528 W 149.20902812 12661.50 89.53 148.71 6635.60 6718.45 1795.53 9666.48 6862.83 991.06 6790.89 7.39 5971033.79 597533.80 N 70.33036101 W 149.20889786 12692.44 90.45 146.37 6635.61 6718.46 1826.09 9697.42 6875.55 964.96 6807.50 8.13 5971007.89 597550.72 N 70.33028965 W 149.20876338 12724.92 89.38 144.22 6635.65 6718.50 1857.94 9729.90 6890.17 938.26 6825.99 7.39 5970981.42 597569.53 N 70.33021667 W 149.20861362 12756.89 91.92 141.93 6635.29 6718.14 1889.03 9761.86 6905.77 912.71 6845.19 10.70 5970956.11 597589.03 N 70.33014681 W 149.20845808 12789.06 92.75 140.56 6633.98 6716.83 1920.03 9794.01 6922.45 887.64 6865.31 4.98 5970931.29 597609.45 N 70.33007829 W 149.20829509 12821.35 92.10 140.47 6632.62 6715.47 1951.04 9826.27 6939.66 862.74 6885.82 2.03 5970906.64 597630.27 N 70.33001022 W 149.20812891 12853.38 90.54 140.80 6631.88 6714.73 1981.84 9858.29 6956.79 837.99 6906.13 4.98 5970882.14 597650.87 N 70.32994253 W 149.20796439 12885.16 88.94 142.41 6632.02 6714.87 2012.54 9890.07 6973.43 813.08 6925.87 7.14 5970857.47 597670.91 N 70.32987444 W 149.20780451 12916.46 90.93 143.88 6632.06 6714.91 2042.99 9921.36 6989.21 788.04 6944.64 7.90 5970832.66 597689.98 N 70.32980598 W 149.20765246 12949.66 88.86 143.19 6632.12 6714.97 2075.34 9954.56 7005.86 761.34 6964.37 6.57 5970806.21 597710.03 N 70.32973299 W 149.20749265 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122PB2\V-122P62 Generated 4/10/2007 1:27 PM Page 5 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft tt ft ft ft de 100 ft ftUS ftUS 1ZyOV.4Z `JI.b/ 143.13 bbJZ.UV b/14 .Ob LIUO.Lb `J`JOb.JL /ULIA/ /3b./L b~OG01 O.OI by/U/O I.OL O~//GO./O IV /U. JL.700J/U VV 1'F~,GV/J93L0 13012.62 91.20 139.93 6631.22 6714 .07 2136.35 10017.51 7038.89 711.52 7002. 84 10.00 5970756.87 597749.09 N 70. 32959681 W 149.20718109 13044.30 89.02 141.01 6631.16 6714 .01 2166.79 10049.19 7056.53 687.09 7023. 00 7.68 5970732.68 597769.54 N 70. 32953001 W 149.20701777 13076.50 90.31 141.37 6631.35 6714 .20 2197.84 10081.39 7074.22 662.00 7043. 18 4.16 5970707.84 597790.02 N 70. 32946141 W 149.20685430 13107.28 89.10 139.92 6631.51 6714 .36 2227.45 10112.17 7091.47 638.20 7062. 70 6.14 5970684.28 597809.83 N 70. 32939634 W 149.20669620 13139.85 89.27 140.35 6631.97 6714 .82 2258.69 10144.73 7110.06 613.21 7083. 57 1.42 5970659.54 597831.00 N 70. 32932800 W i 49.20652711 13171.46 90.11 141.60 6632.14 6714 .99 2289.14 10176.34 7127.82 588.65 7103. 47 4.76 5970635.23 597851.20 N 70. 32926087 W 149.20636590 13203.64 90.01 144.60 6632.11 6714 .96 2320.44 10208.52 7145.00 562.92 7122. 79 9.33 5970609.74 597870.82 N 70. 32919052 W 149.20620943 13235.79 91.34 144.26 6631.73 6714 .58 2351.87 10240.67 7161.64 536.77 7141. 49 4.27 5970583.82 597889.84 N 70. 32911904 W 149.20605798 13267.75 91.10 145.80 6631.05 6713 .90 2383.18 10272.62 7177.99 510.59 7159. 80 4.88 5970557.86 597908.46 N 70. 32904746 W 149.20590967 13299.33 90.02 146.89 6630.74 6713 .59 2414.26 10304.20 7193.63 484.30 7177. 30 4.86 5970531.79 597926.28 N 70. 32897561 W 149.20576796 13330.85 90.72 149.94 6630.54 6713 .39 2445.46 10335.72 7208.34 457.46 7193. 81 9.93 5970505.15 597943.11 N 70. 32890222 W 149.205 13362.71 90.93 150.53 6630.08 6712 .93 2477.12 10367.58 7222.43 429.80 7209. 63 1.97 5970477.69 597959.25 N 70. 32882663 W 149.2055 13394.19 91.03 152.62 6629.54 6712 .39 2508.48 10399.05 7235.79 402.12 7224. 61 6.65 5970450.20 597974.57 N 70. 32875098 W 149.20538500 13426.33 90.50 151.45 6629.11 6711 .96 2540.52 10431.19 7249.32 373.74 7239. 68 4.00 5970422.00 597989.98 N 70. 32867339 W 149.20526301 13458.41 90.00 150.14 6628.97 6711 .82 2572.44 10463.27 7263.56 345.74 7255. 33 4.37 5970394.19 598005.97 N 70. 32859686 W 149.20513630 13488.95 92.16 149.43 6628.40 6711 .25 2602.76 10493.80 7277.71 319.35 7270. 70 7.44 5970368.00 598021.65 N 70. 32852474 W 149.20501191 13520.87 92.58 150.61 6627.08 6709 .93 2634.44 10525.69 7292.47 291.73 7286. 63 3.92 5970340.57 598037.92 N 70. 32844922 W 149.20488289 13553.70 88.87 147.41 6626.66 6709 .51 2666.98 10558.52 7308.29 263.60 7303. 53 14.92 5970312.65 598055.15 N 70. 32837232 W 149.20474608 13586,27 90.79 150.47 6626.76 6709 .61 2699.26 10591.08 7324.12 235.70 7320. 33 11.09 5970284.96 598072.29 N 70. 32829607 W 149.20461006 Last MWD+IFR+MS 13617,81 91.01 144.91 6626.26 6709 .11 2730.41 10622.62 7340.16 209.06 7337. 18 17.64 5970258.53 598089.46 N 70. 32822324 W 149.20447364 Last MWD+IFR+MS 13649.83 94.09 141.90 6624.84 6707 .69 2761.55 10654.60 7358.53 183.38 7356. 25 13.44 5970233.08 598108.83 N 70. 32815304 W 149.20431924 MWD-Standard 13682.03 94.33 143.55 6622.47 6705 .32 2792.74 10686.72 7377.38 157.83 7375. 69 5.16 5970207.77 598128.58 N 70. 32808318 W 149.20416174 13713.91 94.84 138.96 6619.92 6702 .77 2823.38 10718.49 7396.77 133.05 7395. 58 14.44 5970183.24 598148.76 N 70. 32801544 W 149.20400071 13746.33 93.84 138.18 6617.47 6700 .32 2854.14 10750.82 7417.76 108.81 7416. 97 3.91 5970159.26 598170.44 N 70. 32794917 W 149.20382744 TD (Projected) 13819.00 90.00 136.00 6615.04 6697.89 2922.61 10823.44 7466.61 55.63 7466.41 6.08 5970106.69 598220.51 N 70.32780375 W 149.20342697 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination.) MWD +IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Leaal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 4711 FSL 1546 FEL S11 T11 N R11 E UM 5969960.76 590756.02 BHL : 4763 FSL 4268 FEL S7 T11 N R12E UM 5970106.69 598220.51 SuroeyEditor Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\V-122\V-122P62\V-122P62 Generated 4/10/2007 1:27 PM Page 6 of 6 TREE'--s . 4-1118°` CIW WF~LLHEAD = FMC ACTUATOR = KB. ELEV = BF. ELEV = _ LEO 82.85' 54.35' KOP = Ma 44T Da Da x Angle = 96 @ 10684' tum MD = 10324' tum TV D = 6600° SS 20" CONDUCTOR 175' 9-518" CSG, 40#, L-80, BTC, ID = 8.835" - 3462' S TES: ***ACTUAL DEPTHS ARE 7' DEEPER V ,,, ~ ~ ~ THAN LY INDICATES***CHROME TBG*** 7" CSG, 26#, L-80, TGII, ." 5177' ~ 0383 bpf, ID = 6.276 25614-1l2" HES X NIP, ID = 3.813" I 3203' 4-112" X 3-112" XO, ID = 2.992" GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 6 3246 2613 52 MMG DMY RK 0 01(03107 5 4563 3407 52 MMG DCR RKP - 01 /03!07 4 5692 4097 53 MMG DMY RK 0 01 /03/07 3 6851 4801 54 MMG DMY RK 0 01/03/07 2 8358 5497 62 MMG DMY RK 0 01/03/07 1 9926 6438 49 MMG DMY RK 0 01/03/07 $$$7' -13-1/2" HES X NIP, ID = 2.813" Minimum ID = 2.$13" @ 9987' 10008' 3-1l2" HES "SYMPHONY PLUS" GUAGE C 3-1 /2" HES X NIPPLE w/CABLETOSURFACEINIA, ID=2.992" I' 1002$' 3-1/2" XD DURO SLD SLV, ID = 2.813" 10085 7" X 4-1/2" BKR S-3 PKR, ID = 3.870" 3-1/2" HES X NIP, ID = 3.813" 3-1/2" TBG, 9.3#, 13-CRVAM TOP, .0087 bpf, ID = 2.992" TOP OF4-1/2" LNR PERFORATION SUMMARY REF LOG LWD ON 12121106 ANGLE AT TOP PERF: 95 @ 10710' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 6 10710 - 10800 O 01/03/07 2-7/8" 6 10860 - 10970 O 01/03/07 2-7/8" 6 11050 - 11150 O 01103!07 2-7/8" 6 11210 - 11410 O 01/03/07 2-718" 6 11470 - 11730 O 01/03/07 2-7l8" 6 11790 - 12020 O 01!03/07 2-718" 6 12080 - 12350 O 01/03/07 2-7/8" 6 12650 - 13000 O 01/03/07 2-7/8" 6 13080 - 13200 O 01/03/07 2-7/8" 6 13270 - 13310 O 01/03/07 2-f/$; 6 13650 - 13900 O 01/03/07 2-Y/~ 6 13960 - 14120 O 01103107 2-f/~: 6 14170 - 14335 O 01103!07 10131' ~-~ 3-1/2" HES X NIP, ID = 3.813" 10136' 17" X 5" BKR HRD ZXP LTP w / TBACK SLV, ID = 4.370 10153' 3-1/2" WLEG, ID = 2.992" 1015$' 7" X 5" BKR HMC LNR HGR, ID = 4.420 10165' -j5" X 4-1/2" XO, ID = 3.880" 7" MILLOUT WINDOW (V-122) 10311' - 10323' l 11669 MA RKER JOINT w / RA TA G 12355' MARKER JOINT w J RA TAG 13040' MA RKER JOINT w I RA 7A G 14350 I-~PBTD 7" BKR WHIPSTOCK (12/19106) 1031 T \ 7" CSG, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" 10676' 4-1/2" LNR, 12.6#, L-80, IBT-M, .0152 bpf, ID = 3.960" DATE REV BY COMMENTS DATE REV BY COMMENTS U1 /06/07 N9ES ORIGINAL COMPLETION 02!0,5. l07 ?I PJC DRLG DRAFT CORRECTIONS BOREALIS UNfr WELL: V-122 PERMIT No: 2061470' API No: 50-029-23328-00 SEC 11, T11 N, R11 E UM, 4711' FSL & 1546' FEL BP Exploration (Alaska) ~~ G 6' ^.. v SCHLUMBERGER Survey report Client .................... Field ..................... Well ...................... API number ................ Engineer .................: Rig :...................... STATE :.................... ----- Survey calculation m Method for positions.....: Method for DLS...........: BP Exploration (Alaska) Inc. Prudhoe Bay V-122 50-029-23328-00 St. Amour Nabors 9ES Alaska ethods------------- Minimum curvature Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 55.15 ft KB above permanent.......: N/A (Topdrive) DF above permanent.......: 82.85 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 153.07 degrees 30-Dec-2006 09:52:20 Page 1 of 10 Spud date ................. 05-Dec-06 Last survey date.........: 30-Dec-06 Total accepted surveys...: 241 MD of first survey.......: 0.00 ft MD of last survey........: 14437.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............: 05-Dec-2006 Magnetic field strength..: 57581.65 GAMA Magnetic dec (+E/W-).....: 24.04 degrees Magnetic dip .............: 80.86 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............: Tolerance of G...........: Tolerance of H............ Tolerance of Dip.........: Criteria --------- 1002.68 meal 57630.00 LAMA 80.88 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.85 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.85 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction ~J • SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 2 of 10 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.32 36.37 100.00 100.00 -0.13 0.22 0.17 0.28 36.37 0.32 BP _GYD CT DMS 3 173.00 0.29 26.16 73.00 173.00 -0.33 0.55 0.37 0.67 33.55 0.08 BP _GYD CT DMS 4 266.00 0.72 75.06 93.00 265.99 -0.35 0.92 1.04 1.38 48.50 0.62 BP _GYD CT DMS 5 360.00 1.75 66.17 94.00 359.97 -0.15 1.65 2.92 3.35 60.55 1.11 BP _GYD CT DMS 6 447.00 3.46 12.36 87.00 446.89 -2.11 4.75 4.70 6.68 44.68 3.23 BP _GYD CT DMS 7 540.00 4.84 2.62 93.00 539.64 -7.69 11.41 5.48 12.66 25.64 1.66 BP _GYD CT DMS • 8 630.00 6.98 13.67 90.00 629.16 -15.15 20.52 6.94 21.66 18.70 2.68 BP _GYD CT DMS 9 723.00 7.84 42.75 93.00 721.42 -21.65 30.67 12.59 33.15 22.31 4.09 BP _GYD CT DMS 10 814.00 9.52 59.81 91.00 811.39 -24.23 39.02 23.31 45.45 30.85 3.36 BP _GYD CT DMS 11 851.12 10.87 63.04 37.12 847.92 -24.41 42.15 29.08 51.21 34.61 3.95 BP _MWD+IFR+MS 12 943.72 12.86 65.33 92.60 938.54 -24.00 50.41 46.23 68.40 42.52 2.21 BP _MWD+IFR+MS 13 1039.70 16.70 65.96 95.98 1031.33 -22.89 60.49 68.54 91.41 48.57 4.00 BP _MWD+IFR+MS 14 1135.17 20.86 65.69 95.47 1121.69 -21.42 73.08 96.57 121.10 52.88 4.36 BP _MWD+IFR+MS 15 1229.99 24.24 65.16 94.82 1209.25 -19.94 88.21 129.63 156.79 55.77 3.57 BP _MWD+IFR+MS 16 1325.37 27.08 66.48 95.38 1295.22 -17.93 105.10 167.31 197.58 57.86 3.04 BP _MWD+IFR+MS 17 1421.67 29.33 67.94 96.30 1380.08 -14.62 122.71 209.27 242.60 59.61 2.44 BP _MWD+IFR+MS 18 1517.40 32.30 73.70 95.73 1462.30 -7.91 138.70 255.57 290.78 61.51 4.37 BP _MWD+IFR+MS 19 1613.89 35.33 75.23 96.49 1542.46 2.72 153.05 307.31 343.31 63.52 3.26 BP _MWD+IFR+MS 20 1707.50 39.74 79.42 93.61 1616.69 16.86 165.46 362.93 398.86 65.49 5.44 BP _MWD+IFR+MS 21 1802.51 41.22 79.01 95.01 1688.95 34.00 177.00 423.52 459.01 67.32 1.58 BP_MWD+IFR+MS 22 1900.86 43.47 76.05 98.35 1761.65 50.51 191.34 488.17 524.33 68.60 3.06 BP _MWD+IFR+MS 23 1996.78 45.35 72.41 95.92 1830.17 63.46 209.61 552.74 591.14 69.23 3.30 BP _MWD+IFR+MS 24 2091.44 47.10 67.15 94.66 1895.68 71.39 233.26 616.81 659.44 69.29 4.42 BP _MWD+IFR+MS 25 2187.31 49.42 61.79 95.87 1959.53 73.08 264.12 681.29 730.69 68.81 4.82 BP MWD+IFR+MS 26 2283.52 52.72 57.84 96.21 2019.99 68.77 301.78 745.92 804.65 67.97 4.69 BP _MWD+IFR+MS 27 2378.40 52.42 57.56 94.88 2077.66 61.72 342.04 809.61 878.89 67.10 0.39 BP _MWD+IFR+MS 28 2474.64 51.15 54.26 96.24 2137.21 52.32 384.40 872.22 953.17 66.22 3.00 BP _MWD+IFR+MS 29 2569.81 50.60 54.69 95.17 2197.26 41.28 427.30 932.31 1025.56 65.38 0.68 BP _MWD+IFR+MS 30 2665.17 52.12 52.59 95.36 2256.81 29.07 471.46 992.27 1098.58 64.59 2.34 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 3 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2761.41 52.25 52.49 96.24 2315.81 15.17 517.70 1052.62 1173.04 63.81 0.16 BP _MWD+IFR+MS 32 2857.23 52.00 52.65 95.82 2374.64 1.39 563.67 1112.69 1247.32 63.13 0.29 BP _MWD+IFR+MS 33 2952.79 51.74 52.92 95.56 2433.64 -12.03 609.14 1172.55 1321.33 62.55 0.35 BP _MWD+IFR+MS 34 3049.37 51.51 53.39 96.58 2493.60 -25.07 654.54 1233.14 1396.09 62.04 0.45 BP _MWD+IFR+MS 35 3145.19 53.19 53.61 95.82 2552.13 -37.68 699.66 1294.12 1471.15 61.60 1.76 BP _MWD+IFR+MS 36 3239.79 52.51 53.51 94.60 2609.26 -50.14 744.45 1354.78 1545.85 61.21 0.72 BP _MWD+IFR+MS 37 3335.72 52.06 54.15 95.93 2667.94 -62.32 789.24 1416.04 1621.13 60.87 0.71 BP _MWD+IFR+MS 38 3431.23 54.46 54.37 95.51 2725.07 -74.04 833.94 1478.16 1697.18 60.57 2.52 BP _MWD+IFR+MS 39 3527.24 54.30 54.59 96.01 2780.99 -85.70 879.28 1541.69 1774.80 60.30 0.25 BP _MWD+IFR+MS 40 3589.94 53.61 54.05 62.70 2817.88 -93.41 908.85 1582.87 1825.23 60.14 1.30 BP _MWD+IFR+MS 41 3708.88 52.59 53.69 118.94 2889.29 -108.62 964.93 1659.69 1919.80 59.83 0.89 BP _MWD+IFR+MS 42 3805.20 52.55 53.96 96.32 2947.84 -120.91 1010.08 1721.43 1995.89 59.60 0.23 BP _MWD+IFR+MS 43 3900.17 52.65 55.33 94.97 3005.52 -131.96 1053.73 1782.96 2071.06 59.42 1.15 BP _MWD+IFR+MS 44 3998.55 52.62 55.11 98.38 3065.23 -142.64 1098.33 1847.18 2149.05 59.26 0.18 BP _MWD+IFR+MS 45 4087.73 52.82 53.83 89.18 3119.25 -153.25 1139.57 1904.93 2219.76 59.11 1.16 BP MWD+IFR+MS 46 4183.81 52.86 53.01 96.08 3177.28 -166.08 1185.20 1966.41 2295.97 58.92 0.68 BP _MWD+IFR+MS 47 4278.82 52.92 51.95 95.01 3234.61 -180.01 1231.34 2026.51 2371.27 58.72 0.89 BP _MWD+IFR+MS 48 4375.01 52.97 51.96 96.19 3292.57 -194.81 1278.65 2086.96 2447.52 58.50 0.05 BP _MWD+IFR+MS 49 4470.18 52.03 51.48 95.17 3350.51 -209.66 1325.43 2146.23 2522.51 58.30 1.07 BP _MWD+IFR+MS 50 4565.47 52.27 51.69 95.29 3408.97 -224.65 1372.18 2205.19 2597.25 58.11 0.31 BP MWD+IFR+MS 51 4660.63 52.62 52.48 95.16 3466.98 -239.02 1418.53 2264.70 2672.29 57.94 0.75 BP _MWD+IFR+MS 52 4762.44 52.25 53.22 101.81 3529.05 -253.34 1467.27 2329.02 2752.68 57.79 0.68 BP _MWD+IFR+MS 53 4858.64 52.25 53.84 96.20 3587.94 -265.95 1512.48 2390.19 2828.54 57.67 0.51 BP _MWD+IFR+MS 54 4954.11 52.52 54.44 95.47 3646.21 -277.68 1556.78 2451.48 2904.02 57.58 0.57 BP _MWD+IFR+MS 55 5049.70 52.23 54.33 95.59 3704.57 -289.12 1600.87 2513.03 2979.61 57.50 0.32 BP MWD+IFR+MS 56 5145.96 52.17 54.19 96.26 3763.57 -300.77 1645.30 2574.77 3055.56 57.42 0.13 BP _MWD+IFR+MS 57 5241.70 52.02 54.53 95.74 3822.39 -312.21 1689.31 2636.16 3130.99 57.35 0.32 BP _MWD+IFR+MS 58 5337.86 52.38 54.47 96.16 3881.32 -323.53 1733.44 2698.02 3206.88 57.28 0.38 BP _MWD+IFR+MS 59 5433.69 52.25 54.95 95.83 3939.91 -334.55 1777.25 2759.92 3282.65 57.22 0.42 BP _MWD+IFR+MS 60 5529.07 52.73 55.77 95.38 3997.98 -344.70 1820.25 2822.17 3358.26 57.18 0.85 BP _MWD+IFR+MS SCHLUP~IBERGER Survey Report 30 -Dec-2006 09:52:20 Page 4 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5624.94 52.76 55.14 95.87 4056.02 -354.82 1863.52 2885.02 3434.54 57.14 0.52 BP _MWD+IFR+MS 62 5720.14 52.43 54.10 95.20 4113.85 -365.93 1907.31 2946.68 3510.09 57.09 0.93 BP _MWD+IFR+MS 63 5815.15 52.69 53.75 95.01 4171.61 -377.92 1951.73 3007.65 3585.41 57.02 0.40 BP _MWD+IFR+MS 64 5910.82 52.83 53.54 95.67 4229.50 -390.39 1996.88 3068.99 3661.45 56.95 0.23 BP _MWD+IFR+MS 65 6006.44 52.36 53.11 95.62 4287.59 -403.24 2042.24 3129.91 3737.25 56.88 0.61 BP MWD+IFR+MS 66 6101.92 52.79 53.46 95.48 4345.61 -416.13 2087.57 3190.69 3812.93 56.80 0.54 BP _MWD+IFR+MS 67 6197.56 52.37 53.52 95.64 4403.73 -428.77 2132.77 3251.74 3888.77 56.74 0.44 BP _MWD+IFR+MS 68 6293.14 52.23 53.40 95.58 4462.18 -441.40 2177.79 3312.50 3964.27 56.68 0.18 BP _MWD+IFR+MS 69 6389.43 52.20 53.52 96.29 4521.18 -454.10 2223.10 3373.64 4040.25 56.62 0.10 BP _MWD+IFR+MS 70 6485.12 52.21 53.24 95.69 4579.82 -466.83 2268.20 3434.33 4115.75 56.56 0.23 BP MWD+IFR+MS 71 6581.00 52.54 53.57 95.88 4638.35 -479.58 2313.48 3495.30 4191.57 56.50 0.44 BP _MWD+IFR+MS 72 6675.72 52.84 53.98 94.72 4695.77 -491.74 2358.00 3556.07 4266.83 56.45 0.47 BP _MWD+IFR+MS 73 6771.66 53.00 53.50 95.94 4753.61 -504.15 2403.27 3617.79 4343.28 56.40 0.43 BP _MWD+IFR+MS 74 6867.98 54.60 55.16 96.32 4810.50 -515.95 2448.58 3680.94 4420.95 56.37 2.17 BP _MWD+IFR+MS 75 6963.03 58.27 57.21 95.05 4863.04 -525.41 2492.62 3746.74 4500.13 56.37 4.26 BP MWD+IFR+MS 76 7060.04 62.59 57.60 97.01 4910.91 -533.73 2538.05 3817.81 4584.47 56.38 4.47 BP _MWD+IFR+MS 77 7155.89 65.52 55.13 95.85 4952.84 -543.82 2585.80 3889.54 4670.65 56.38 3.84 BP _MWD+IFR+MS 78 7250.97 65.34 53.47 95.08 4992.38 -557.00 2636.26 3959.76 4757.06 56.35 1.60 BP _MWD+IFR+MS 79 7346.28 64.43 51.47 95.31 5032.84 -572.87 2688.82 4028.20 4843.15 56.28 2.13 BP _MWD+IFR+MS 80 7442.09 63.47 51.03 95.81 5074.91 -590.50 2742.70 4095.33 4928.90 56.19 1.08 BP MWD+IFR+MS 81 7536.64 62.28 50.16 94.55 5118.02 -608.67 2796.11 4160.35 5012.66 56.10 1.50 BP _MWD+IFR+MS 82 7632.69 62.42 49.10 96.05 5162.59 -628.45 2851.22 4225.17 5097.21 55.99 0.99 BP _MWD+IFR+MS 83 7727.06 62.43 48.27 94.37 5206.28 -649.23 2906.44 4288.00 5180.19 55.87 0.78 BP _MWD+IFR+MS 84 7822.83 62.41 48.54 95.77 5250.62 -670.72 2962.80 4351.48 5264.37 55.75 0.25 BP _MWD+IFR+MS 85 7918.81 62.17 49.77 95.98 5295.25 -691.15 3018.37 4415.76 5348.78 55.65 1.16 BP MWD+IFR+MS 86 8014.38 62.10 50.63 95.57 5339.92 -709.97 3072.45 4480.67 5432.90 55.56 0.80 BP _MWD+IFR+MS 87 8110.12 62.46 50.90 95.74 5384.45 -728.03 3126.06 4546.31 5517.35 55.49 0.45 BP _MWD+IFR+MS 88 8206.44 62.25 50.27 96.32 5429.15 -746.48 3180.23 4612.23 5602.37 55.41 0.62 BP _MWD+IFR+MS 89 8302.03 62.27 50.70 95.59 5473.64 -764.91 3234.06 4677.50 5686.67 55.34 0.40 BP _MWD+IFR+MS 90 8397.65 62.33 51.12 95.62 5518.09 -782.75 3287.44 4743.21 5771.08 55.27 0.39 BP MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 5 of 10 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ -------- Total ------- At ----- DLS - ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 91 -------- 8493.23 ------ 60.63 ------- 55.10 ------ 95.58 -------- 5563.74 -------- -797.29 -------- 3337.86 -------- 4810.34 -------- 5854,97 ------- 55.24 ----- 4.07 - BP ---- ------ _MWD+IFR+MS 92 8588.45 57.99 60.75 95.22 5612.36 -804.68 3381.36 4879.65 5936.71 55.28 5.81 BP _MWD+IFR+MS 93 8684.80 56.51 66.85 96.35 5664.52 -803.69 3417.14 4952.28 6016.81 55.39 5.54 BP _MWD+IFR+MS 94 8779.83 54.74 73.40 95.03 5718.21 -794.11 3443.82 5025.96 6092.64 55.58 5.98 BP_MWD+IFR+MS 95 8875.57 55.12 76.04 95.74 5773.23 -778.28 3464.47 5101.54 6166.71 55.82 2.29 BP _MWD+IFR+MS 96 8970.90 54.99 79.41 95.33 5827.84 -758.52 3481.08 5177.88 6239.26 56.09 2.90 BP _MWD+IFR+MS 97 9066.76 55.19 81.94 95.86 5882.71 -734.75 3493.81 5255.44 6310.81 56.38 2.17 BP _MWD+IFR+MS 98 9162.32 54.40 85.25 95.56 5937.81 -707.39 3502.53 5333.01 6380.34 56.70 2.95 BP _MWD+IFR+MS 99 9257.90 51.67 86.36 95.58 5995.28 -677.89 3508.13 5409.17 6447.18 57.03 3.00 BP _MWD+IFR+MS 100 9354.31 49.39 89.25 96.41 6056.57 -646.78 3511.01 5483.52 6511.23 57.37 3.31 BP _MWD+IFR+MS 101 9449.03 48.95 93.69 94.72 6118.51 -612.72 3509.18 5555.13 6570.68 57.72 3.58 BP _MWD+IFR+MS 102 9540.43 48.98 100.03 91.40 6178.56 -574.41 3500.95 5623.51 6624.24 58.10 5.23 BP _MWD+IFR+MS 103 9635.91 47.20 107.01 95.48 6242.37 -528.41 3484.42 5692.53 6674.29 58.53 5.75 BP _MWD+IFR+MS 104 9731.84 46.68 117.47 95.93 6307.97 -475.54 3457.99 5757.24 6715.92 59.01 7.98 BP _MWD+IFR+MS 105 9827.40 48.32 124.50 95.56 6372.57 -415.89 3421.71 5817.54 6749.22 59.54 5.69 BP _MWD+IFR+MS 106 9922.63 49.00 128.39 95.23 6435.48 -351.99 3379.25 5875.03 6777.56 60.09 3.15 BP _MWD+IFR+MS 107 10017.92 50.26 132.75 95.29 6497.22 -284.94 3332.03 5930.13 6802.13 60.67 3.73 BP _MWD+IFR+MS 108 10114.26 50.93 136.05 96.34 6558.39 -214.43 3279.95 5983.30 6823.34 61.27 2.74 BP _MWD+IFR+MS 109 10210.14 53.43 139.80 95.88 6617.19 -141.34 3223.73 6034.00 6841.17 61.89 4.04 BP _MWD+IFR+MS 110 10305.43 55.40 139.50 95.29 6672.64 -65.97 3164.67 6084.17 6858.01 62.52 2.08 BP _MWD+IFR+MS 111 10311.00 55.40 139.60 5.57 6675.80 -61.51 3161.19 6087.15 6859.04 62.56 1.48 BP _BLIND 112 10323.00 57.25 140.19 12.00 6682.45 -51.78 3153.55 6093.58 6861.24 62.64 15.95 BP _BLIND 113 10342.17 57.74 141.09 19.17 6692.75 -36.00 3141.05 6103.83 6864.62 62.77 4.71 BP _INC+TREND 114 10374.17 65.05 142.60 32.00 6708.06 -8.46 3118.96 6121.17 6869.98 63.00 23.22 BP _INC+TREND 115 10406.26 72.13 144.12 32.09 6719.77 20.97 3095.00 6138.98 6875.03 63.24 22.50 BP _MWD+IFR+MS 116 10437.61 78.53 144.60 31.35 6727.71 50.93 3070.37 6156.64 6879.78 63.49 20.47 BP _MWD+IFR+MS 117 10469.18 86.09 143.46 31.57 6731.93 81.81 3045.07 6175.00 6884.99 63.75 24.21 BP _MWD+IFR+MS 118 10493.55 92.17 141.68 24.37 6732.30 105.75 3025.73 6189.80 6889.75 63.95 25.99 BP _MWD+IFR+MS 119 10524.44 92.40 145.67 30.89 6731.07 136.20 3000.86 6208.08 6895.32 64.20 12.93 BP _MWD+IFR+MS 120 10556.83 93.08 148.57 32.39 6729.52 168.38 2973.70 6225.65 6899.39 64.47 9.19 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 6 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 10588.04 95.09 151.60 31.21 6727.29 199.46 2946.72 6241.17 6901.84 64.73 11.63 BP_MWD+IFR+MS 122 10620.18 95.40 153.80 32.14 6724.36 231.46 2918.28 6255.85 6903.04 64.99 6.88 BP _MWD+IFR+MS 123 10652.66 95.50 157.03 32.48 6721.27 263.76 2888.88 6269.30 6902.88 65.26 9.90 BP _MWD+IFR+MS 124 10684.26 95.57 161.69 31.60 6718.22 295.02 2859.46 6280.38 6900.70 65.52 14.68 BP _MWD+IFR+MS 125 10715.63 94.51 164.46 31.37 6715.46 325.79 2829.56 6289.48 6896.66 65.78 9.42 BP _MWD+IFR+MS 126 10747.75 94.66 167.40 32.12 6712.90 357.00 2798.51 6297.26 6891.09 66.04 9.14 BP _MWD+IFR+MS 127 10779.78 95.36 171.06 32.03 6710.10 387.64 2767.17 6303.22 6883.88 66.30 11.59 BP _MWD+IFR+MS 128 10811.00 94.98 175.31 31.22 6707.28 416.83 2736.31 6306.91 6874.92 66.55 13.61 BP _MWD+IFR+MS 129 10844.32 94.52 179.07 33.32 6704.52 447.13 2703.15 6308.54 6863.28 66.81 11.33 BP _MWD+IFR+MS 130 10876.14 94.78 180.21 31.82 6701.94 475.49 2671.43 6308.74 6851.04 67.05 3.66 BP _MWD+IFR+MS 131 10907.60 94.70 180.79 31.46 6699.34 503.32 2640.08 6308.46 6838.62 67.29 1.85 BP _MWD+IFR+MS 132 10939.49 94.95 179.79 31.89 6696.66 531.58 2608.30 6308.30 6826.27 67.54 3.22 BP _MWD+IFR+MS 133 10972.49 95.15 180.25 33.00 6693.76 560.88 2575.43 6308.29 6813.77 67.79 1.52 BP _MWD+IFR+MS 134 11004.31 93.45 178.65 31.82 6691.37 589.31 2543.71 6308.60 6802.12 68.04 7.33 BP _MWD+IFR+MS 135 11035.97 92.07 178.57 31.66 6689.85 617.84 2512.09 6309.36 6791.07 68.29 4.37 BP _MWD+IFR+MS 136 11067.53 91.92 178.93 31.56 6688.75 646.26 2480.56 6310.05 6780.11 68.54 1.24 BP _MWD+IFR+MS 137 11099.39 91.89 179.03 31.86 6687.69 674.91 2448.72 6310.62 6769.06 68.79 0.33 BP _MWD+IFR+MS 138 11131.67 91.93 179.16 32.28 6686.61 703.90 2416.46 6311.13 6757.93 69.05 0.42 BP _MWD+IFR+MS 139 11163.31 91.76 179.68 31.64 6685.59 732.23 2384.84 b311.45 6746.99 69.30 1.73 BP _MWD+IFR+MS 140 11195.00 91.68 180.08 31.69 6684.64 760.51 2353.17 6311.52 6735.92 69.55 1.29 BP _MWD+IFR+MS 141 11226.90 92.89 180.00 31.90 6683.37 788.91 2321.29 6311.49 6724.83 69.81 3.80 BP _MWD+IFR+MS 142 11258.74 91.68 177.76 31.84 6682.10 817.55 2289.49 6312.12 6714.50 70.06 7.99 BP _MWD+IFR+MS 143 11291.14 91.21 176.87 32.40 6681.28 847.08 2257.13 6313.63 6704.97 70.33 3.11 BP _MWD+IFR+MS 144 11323.04 91.96 177.18 31.90 6680.40 876.23 2225.29 6315.29 6695.88 70.59 2.54 BP _MWD+IFR+MS 145 11354.62 90.18 174.77 31.58 6679.81 905.31 2193.80 6317.50 6687.57 70.85 9.49 BP _MWD+IFR+MS 146 11386.19 90.72 175.62 31.57 6679.56 934.55 2162.34 6320.15 6679.82 71.11 3.19 BP_MWD+IFR+MS 147 11418.27 90.22 173.62 32.08 6679.30 964.39 2130.40 6323.16 6672.40 71.38 6.43 BP _MWD+IFR+MS 148 11450.28 90.76 173.81 32.01 6679.03 994.34 2098.59 6326.66 6665.63 71.65 1.79 BP _MWD+IFR+MS 149 11481.87 90.76 175.54 31.59 6678.61 1023.71 2067.14 6329.59 6658.59 71.91 5.48 BP _MWD+IFR+MS 150 11513.81 89.31 172.12 31.94 6678.59 1053.57 2035.39 6333.02 6652.07 72.18 11.63 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 7 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 11546.45 89.05 172.33 32.64 6679.06 1084.40 2003.05 6337.44 6646.45 72.46 1.02 BP _MWD+IFR+MS 152 11577.49 88.13 171.00 31.04 6679.82 1113.81 1972.35 6341.94 6641.56 72.72 5.21 BP _MWD+IFR+MS 153 11609.64 89.11 168.61 32.15 6680.59 1144.58 1940.72 6347.62 6637.67 73.00 8.03 BP _MWD+IFR+MS 154 11641.42 88.26 165.68 31.78 6681.32 1175.40 1909.75 6354.69 6635.45 73.27 9.60 BP _MWD+IFR+MS 155 11673.70 86.40 163.54 32.28 6682.83 1206.99 1878.66 6363.25 6634.78 73.55 8.78 BP _MWD+IFR+MS 156 11705.12 89.92 162.08 31.42 6683.84 1237.93 1848.66 6372.53 6635.26 73.82 12.13 BP _MWD+IFR+MS 157 11737.08 87.24 160.66 31.96 6684.63 1269.54 1818.39 6382.73 6636.70 74.10 9.49 BP _MWD+IFR+MS 158 11767.68 89.19 159.89 30.60 6685.58 1299.89 1789.60 6393.06 6638.81 74.36 6.85 BP _MWD+IFR+MS 159 11800.13 91.89 156.46 32.45 6685.28 1332.20 1759.49 6405.12 6642.39 74.64 13.45 BP _MWD+IFR+MS 160 11832.10 92.51 156.98 31.97 6684.05 1364.08 1730.14 6417.74 6646.86 74.91 2.53 BP _MWD+IFR+MS 161 11864.39 89.36 156.72 32.29 6683.52 1396.29 1700.46 6430.43 6651.47 75.19 9.79 BP _MWD+IFR+MS 162 11896.16 89.14 156.72 31.77 6683.94 1427.99 1671.28 6442.99 6656.22 75.46 0.69 BP _MWD+IFR+M5 163 11928.54 89.46 156.53 32.38 6684.33 1460.31 1641.56 6455.83 6661.27 75.73 1.15 BP _MWD+IFR+MS 164 11960.10 89.01 156.47 31.56 6684.75 1491.81 1612.62 6468.42 6666.41 76.00 1.44 BP _MWD+IFR+MS 165 11991.93 87.78 156.49 31.83 6685.65 1523.57 1583.45 6481.11 6671.74 76.27 3.86 BP MWD+IFR+MS 166 12023.88 89.15 154.84 31.95 6686.50 1555.47 1554.35 6494.27 6677.69 76.54 6.71 BP _MWD+IFR+MS 167 12055.73 88.70 153.27 31.85 6687.10 1587.31 1525.71 6508.21 6684.65 76.81 5.13 BP _MWD+IFR+MS 168 12087.64 87.13 151.98 31.91 6688.26 1619.20 1497.40 6522.87 6692.53 77.07 6.37 BP _MWD+IFR+MS 169 12118.90 87.15 153.66 31.26 6689.82 1650.42 1469.62 6537.13 6700.29 77.33 5.37 BP _MWD+IFR+MS 170 12150.53 87.78 152.57 31.63 6691.22 1682.02 1441.44 6551.42 6708.12 77.59 3.98 BP MWD+IFR+MS 171 12182.77 87.71 152.37 32.24 6692.49 1714.23 1412.87 6566.31 6716.59 77.86 0.66 BP _MWD+IFR+MS 172 12214.69 86.49 151.28 31.92 6694.10 1746.10 1384.77 6581.36 6725.47 78.12 5.12 BP _MWD+IFR+MS 173 12246.58 86.58 150.41 31.89 6696.03 1777.91 1356.97 6596.87 6734.99 78.38 2.74 BP _MWD+IFR+MS 174 12278.39 86.58 150.58 31.81 6697.93 1809.63 1329.34 6612.51 6744.80 78.63 0.53 BP _MWD+IFR+MS 175 12310.25 86.85 152.39 31.86 6699.75 1841.42 1301.39 6627.69 6754.25 78.89 5.73 BP MWD+IFR+MS 176 12341.95 86.46 152.37 31.70 6701.60 1873.07 1273.35 6642.36 6763.31 79.15 1.23 BP _MWD+IFR+MS 177 12373.69 87.33 151.81 31.74 6703.32 1904.76 1245.34 6657.20 6772.68 79.40 3.26 BP _MWD+IFR+MS 178 12405.48 87.50 151.74 31.79 6704.76 1936.51 1217.36 6672.22 6782.36 79.66 0.58 BP _MVJD+IFR+MS 179 12437.44 87.12 152.05 31.96 6706.26 1968.42 1189.20 6687.26 6792.17 79.92 1.53 BP _MWD+IFR+MS 180 12470.09 85.35 151.72 32.65 6708.40 2000.99 1160.47 6702.61 6802.33 80.18 5.51 BP MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 8 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 181 -------- 12501.79 ------ 86.92 ------- 152,53 ------ 31.70 -------- 6710.54 -------- 2032.62 ------- 1132.51 --------- 6717.39 -------- 6812.19 ------- 80.43 ----- 5.57 - BP ---- ------ _M[n1D+IFR+MS 182 12533.40 86.81 154.34 31.61 6712.27 2064.18 1104.28 6731.51 6821.48 80.68 5.73 BP _MWD+IFR+MS 183 12565.73 85.32 154.20 32.33 6714.49 2096.42 1075.23 6745.51 6830.67 80.94 4.63 BP _MWD+IFR+MS 184 12597.62 87.85 153.49 31.89 6716.38 2128.25 1046.66 6759.54 6840.10 81.20 8.24 BP _MWD+IFR+MS 185 12629.91 87.61 150.04 32.29 6717.66 2160.50 1018.23 6774.80 6850.90 81.45 10.70 BP _MWD+IFR+MS 186 12661.50 89.53 148.71 31.59 6718.45 2192.01 991.06 6790.89 6862.83 81.70 7.39 BP _MWD+IFR+MS 187 12692.44 90.45 146.37 30.94 6718.46 2222.81 964.96 6807.50 6875.55 81.93 8.13 BP _MWD+IFR+MS 188 12724.92 89.38 144.22 32.48 6718.51 2254.99 938.26 6825.99 6890.17 82.17 7.39 BP _MWD+IFR+MS 189 12756.89 91.92 141.93 31.97 6718.14 2286.46 912.71 6845.19 6905.77 82.41 10.70 BP _MWD+IFR+MS 190 12789.06 92.75 140.56 32.17 6716.83 2317.93 887.64 6865.31 6922.45 82.63 4.98 BP _MWD+IFR+MS 191 12821.35 92.10 140.47 32.29 6715.47 2349.41 862.74 6885.82 6939.66 82.86 2.03 BP _MWD+IFR+MS 192 12853.38 90.54 140.80 32.03 6714.73 2380.68 837.99 6906.13 6956.79 83.08 4.98 BP _MWD+IFR+MS 193 12885.16 88.94 142.41 31.78 6714.87 2411.83 813.08 6925.87 6973.43 83.30 7.14 BP _MWD+IFR+MS 194 12916.46 90.93 143.88 31.30 6714.91 2442.66 788.04 6944.64 6989.21 83.53 7.90 BP _MWD+IFR+MS 195 12949.66 88.86 143.19 33.20 6714.97 2475.40 761.34 6964.37 7005.86 83.76 6.57 BP _MWD+IFR+MS 196 12980.42 91.57 143.13 30.76 6714.85 2505.69 736.72 6982.81 7021.57 83.98 8.81 BP _MWD+IFR+MS 197 13012.62 91.20 139.93 .32.20 6714.08 2537.23 711.52 7002.84 7038.89 84.20 10.00 BP _MWD+IFR+MS 198 13044.30 89.02 141.01 31.68 6714.02 2568.14 687.09 7023.00 7056.53 84.41 7.68 BP _MWD+IFR+MS 199 13076.50 90.31 141.37 32.20 6714.20 2599.65 662.00 7043.18 7074.22 84.63 4.16 BP _MWD+IFR+MS 200 13107.28 89.10 139.92 30.78 6714.36 2629.71 638.20 7062.70 7091.47 84.84 6.14 BP _MWD+IFR+MS 201 13139.85 89.27 140.35 32.57 6714.83 2661.45 613.21 7083.57 7110.06 85.05 1.42 BP _MWD+IFR+MS 202 13171.46 90.11 141.60 31.61 6715.00 2692.36 588.65 7103.47 7127.82 85.26 4.76 BP _MWD+IFR+MS 203 13203.64 90.01 144.60 32.18 6714.96 2724.05 562.92 7122.79 7145.00 85.48 9.33 BP _MWD+IFR+MS 204 13235.79 91.34 144.26 32.15 6714.58 2755.83 536.77 7141.49 7161.64 85.70 4.27 BP _MWD+IFR+MS 205 13267.75 91.10 145.80 31.96 6713.90 2787.47 510.59 7159.81 7177.99 85.92 4.88 BP _MWD+IFR+MS 206 13299.33 90.02 146.89 31.58 6713.59 2818.83 484.30 7177.31 7193.63 86.14 4.86 BP _MWD+IFR+MS 207 13330.85 90.72 149.94 31.52 6713.39 2850.24 457.46 7193.81 7208.34 86.36 9.93 BP _MWD+IFR+MS 208 13362.71 90.93 150.53 31.86 6712.93 2882.06 429.80 7209.63 7222.43 86.59 1.97 BP _MWD+IFR+MS 209 13394.19 91.03 152.62 31.48 6712.39 2913.52 402.12 7224.61 7235.79 86.81 6.65 BP _MWD+IFR+MS 210 13426.33 90.50 151.45 32.14 6711.96 2945.65 373.74 7239.68 7249.32 87.04 4.00 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 30-Dec-2006 09:52:20 Page 9 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 13458.41 90.00 150.14 32.08 6711.82 2977.71 345.74 7255.33 7263.56 87.27 4.37 BP _MWD+IFR+MS 212 13488.87 91.28 149.54 30.46 6711.48 3008.11 319.40 7270.63 7277.65 87.48 4.64 BP _MWD+IFR+MS 213 13522.31 87.81 149.96 33.44 6711.75 3041.49 290.52 7287.48 7293.26 87.72 10.45 BP _MWD+IFR+MS 214 13554.55 86.68 147.18 32.24 6713.30 3073.59 263.05 7304.27 7309.00 87.94 9.30 BP _MWD+IFR+MS 215 13585.46 87.74 143.85 30.91 6714.80 3104.19 237.60 7321.74 7325.60 88.14 11.29 BP MWD+IFR+MS 216 13618.04 91.00 141.67 32.58 6715.16 3136.24 211.67 7341.45 7344.51 88.35 12.04 BP _MWD+IFR+MS 217 13650.42 89.48 139.80 32.38 6715.03 3167.87 186.61 7361.95 7364.31 $8.55 7.44 BP _MWD+IFR+MS 218 13681.83 89.34 138.38 31.41 6715.35 3198.35 162.87 7382.51 7384.31 88.74 4.54 BP _MWD+IFR+MS 219 13713.93 89.54 138.14 32.10 6715.66 3229.38 138.92 7403.88 7405.19 88.93 0.97 BP _MWD+IFR+MS 220 13746.33 90.48 137.08 32.40 6715.66 3260.60 114.99 7425.73 7426.62 89.11 4.37 BP MWD+IFR+MS 221 13777.93 222 13809.20 223 13841.86 224 13873.16 225 13903.57 226 13936.75 227 13968.85 228 14000.15 229 14032.30 230 14063.67 231 14095.74 232 14128.42 233 14160.59 234 14192.96 235 14224.18 236 14255.88 237 14288.49 238 14320.28 239 14351.67 240 14391.11 90.68 137.24 31.60 6715.34 3290.99 91.82 7447.21 7447.78 89.29 0.81 BP_ MWD+IFR+MS 90.00 136.60 31.27 6715.15 3321.03 68.98 7468.57 7468.89 89.47. 2.99 BP_ MWD+IFR+MS 90.52 132.70 32.66 6715.00 3352.01 46.03 7491.80 7491.94 89.65 12.05 BP_ MWD+IFR+MS 91.20 132.01 31.30 6714.53 3381.28 24.95 7514.93 7514.97 89.81 3.09 BP_ MWD+IFR+MS 90.65 132.15 30.41 6714.04 3409.67 4.57 7537.49 7537.50 89.97 1.87 BP MWD+IFR+MS 90.48 130.86 33.18 6713.72 3440.52 -17.42 7562.34 7562.36 90.13 3.92 BP _MWD+IFR+MS 90.31 133.44 32.10 6713.50 3470.50 -38.95 7586.14 7586.24 90.29 8.05 BP _MWD+IFR+MS 87.62 131.37 31.30 6714.06 3499.78 -60.06 7609.24 7609.48 90.45 10.84 BP _MWD+IFR+MS 87.44 130.88 32.15 6715.45 3529.57 -81.18 7633.44 7633.87 90.61 1.62 BP _MWD+IFR+MS 87.93 132.56 31.37 6716.71 3558.77 -102.04 7656.83 7657.51 90.76 5.57 BP MWD+IFR+MS 87.92 134.31 32.07 6717.88 3588.95 -124.07 7680.10 7681.10 90.93 5.45 BP_ MWD+IFR+MS 88.67 136.51 32.68 6718.85 3620.07 -147.33 7703.03 7704.44 91.10 7.11 BP MWD+IFR+MS 90.68 138.79 32.17 6719.03 3651.08 -171.11 7724.70 7726.60 91.27 9.45 BP _MWD+IFR+MS 89.26 137.54 32.37 6719.05 3682.36 -195.22 7746.29 7748.75 91.44 5.84 BP _MWD+IFR+MS 88.06 137.60 31.22 6719.78 3712.44 -218.26 7767.35 7770.41 91.61 3.85 BP MWD+IFR+MS 87.24 138.75 31.70 6721.08 3743.05 -241.86 7788.47 7792.22 91.78 4.45 BP _MWD+IFR+MS 90.92 140.85 32.61 6721.60 3774.77 -266.76 7809.51 7814.07 91.96 12.99 BP _MWD+IFR+MS 91.30 139.08 31.79 6720.98 3805.73 -291.10 7829.96 7835.36 92.13 5.69 BP _MWD+IFR+MS 90.03 137.48 31.39 6720.62 3836.08 -314.52 7850.84 7857.14 92.29 6.51 BP _MWD+IFR+MS 87.15 136.14 39.44 6721.59 3873.92 -343.27 7877.82 7885.30 92.50 8.05 BP MWD+IFR+MS SCHLUMBERGER Survey Report 30 -Dec-2006 09:52:20 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 14437.00 87.15 136.14 45.89 6723.87 3917.77 -376.31 7909.58 7918.53 92.72 0.00 Projected to TD [(c)2006 IDEAL ID10_2C_01] • • O s'~ ~: SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Prudhoe Bay Well ...................... V-122PB1 API number ...............: 50-029-23328-70 Engineer .................: St. Amour Rig :...................... Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 55.15 ft KB above permanent.......: N/A (Topdrive) DF above permanent.......: 82.85 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 63.89 degrees 16-Dec-2006 10:34:58 Page 1 of 5 Spud date ................. 05-Dec-06 Last survey date.........: 16-Dec-06 Total accepted surveys...: 115 MD of first survey.......: 0.00 ft MD of last survey........: 10685.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............: 05-Dec-2006 Magnetic field strength..: 57581.65 GAMA Magnetic dec (+E/W-).....: 24.04 degrees Magnetic dip .............: 80.86 degrees ----- MWD survey Reference Criteria --------- Reference G ..............: 1002.68 meal Reference H ..............: 57630.00 GAMA Reference Dip ............: 80.88 degrees Tolerance of G...........: (+/-) 2.50 meal Tolerance of H...........: (+/-)300.00 GAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.85 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.85 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction C7 • SCHLUMBERGER Survey Report 16-Dec-2006 10:34:58 Page 2 of 5 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) ------- (ft) - -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 1 -------- 0.00 ------ 0.00 ------- 350.00 ------ 0.00 ------- 0.00 - -------- 0.00 -------- 0.00 -------- 0.00 -------- 0.00 ------- 0.00 ----- 0.00 ----- ------ TIP None 2 100.00 0.32 36.37 100.00 100.00 0.25 0.22 0.17 0.28 36.37 0.32 BP _GYD CT DMS 3 173.00 0.29 26.16 73.00 173.00 0.57 0.55 0.37 0.67 33.55 0.08 BP _GYD CT DMS 4 266.00 0.72 75.06 93.00 265.99 1.33 0.92 1.04 1.38 48.50 0.62 BP _GYD CT DMS 5 360.00 1.75 66.17 94.00 359.97 3.35 1.65 2.92 3.35 60.55 1.21 BP _GYD CT DMS 6 447.00 3.46 12.36 87.00 446.89 6.31 4.75 4.70 6.68 44.68 3.23 BP _GYD CT DMS 7 540.00 4.84 2.62 93.00 539.64 9.94 11.41 5.48 12.66 25.64 1.66 BP _GYD CT DMS 8 630.00 6.98 13.67 90.00 629.16 15.26 20.52 6.94 21.66 18.70 2.68 BP _GYD CT DMS 9 723.00 7.84 42.75 93.00 721.42 24.80 30.67 12.59 33.15 22.31 4.09 BP _GYD CT DMS 10 814.00 9.52 59.81 91.00 811.39 38.10 39.02 23.31 45.45 30.85 3.36 BP _GYD CT DMS 11 851.12 10.87 63.04 37.12 847.92 44.66 42.15 29.08 51.21 34.61 3.95 BP _MWD+IFR+MS 12 943.72 12.86 65.33 92.60 938.54 63.69 50.41 46.23 68.40 42.52 2.21 BP _MWD+IFR+MS 13 1039.70 16.70 65.96 95.98 1031.33 88.16 60.49 68.54 91.41 48.57 4.00 BP _MWD+IFR+MS 14 1135.17 20.86 65.69 95.47 1121.69 118.87 73.08 96.57 121.10 52.88 4.36 BP _MWD+IFR+MS 15 1229.99 24.24 65.16 94.82 1209.25 155.22 88.21 129.63 156.79 55.77 3.57 BP _MWD+IFR+MS 16 1325.37 27.08 66.48 95.38 1295.22 196.49 105.10 167.31 197.58 57.86 3.04 BP _MWD+IFR+MS 17 1421.67 29.33 67.94 96.30 1380.08 241.92 122.71 209.27 242.60 59.61 2.44 BP _MWD+IFR+MS 18 1517.40 32.30 73.70 95.73 1462.30 290.53 138.70 255.57 290.78 61.51 4.37 BP _MWD+IFR+MS 19 1613.89 35.33 75.23 96.49 1542.46 343.30 153.05 307.31 343.31 63.52 3.26 BP _MWD+IFR+MS 20 1707.50 39.74 79.42 93.61 1616.69 398.71 165.46 362.93 398.86 65.49 5.44 BP _MWD+IFR+MS 21 1802.51 41.22 79.01 95.01 1688.95 458.20 177.00 423.52 459.01 67.32 1.58 BP _MWD+IFR+MS • 22 1900.86 43.47 76.05 98.35 1761.65 522.57 191.34 488.17 524.33 68.60 3.06 BP _MWD+IFR+MS 23 1996.78 45.35 72.41 95.92 1830.17 588.58 209.61 552.74 591.14 69.23 3.30 BP _MWD+IFR+MS 24 2091.44 47.10 67.15 94.66 1895.68 656.53 233.26 616.81 659.44 69.29 4.42 BP _MWD+IFR+MS 25 2187.31 49.42 61.79 95.87 1959.53 728.01 264.12 681.29 730.69 68.81 4.82 BP _MWD+IFR+MS 26 2283.52 52.72 57.84 96.21 2019.99 802.62 301.78 745.92 804.65 67.97 4.69 BP _MWD+IFR+MS 27 2378.40 52.42 57.56 94.88 2077.66 877.52 342.04 809.61 878.89 67.10 0.39 BP _MWD+IFR+MS 28 2474.64 51.15 54.26 96.24 2137.21 952.39 384.40 872.22 953.17 66.22 3.00 BP _MWD+IFR+MS 29 2569.81 50.60 54.69 95.17 2197.26 1025.22 427.30 932.31 1025.56 65.38 0.68 BP _MWD+IFR+MS 30 2665.17 52.12 52.59 95.36 2256.81 1098.50 471.46 992.27 1098.58 64.59 2.34 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 16 -Dec-2006 10:34:58 Page 3 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2761.41 52.25 52.49 96.24 2315.81 1173.04 517.70 1052.62 1173.04 63.81 0.16 BP_ MWD+IFR+MS 32 2857.23 52.00 52.65 95.82 2374.64 1247.21 563.67 1112.69 1247.32 63.13 0.29 BP_ MWD+IFR+MS 33 2952.79 51.74 52.92 95.56 2433.64 1320.97 609.14 1172.55 1321.33 62.55 0.35 BP_ MWD+IFR+MS 34 3049.37 51.51 53.39 96.58 2493.60 1395.35 654.54 1233.14 1396.09 62.04 0.45 BP_ MWD+IFR+MS 35 3145.19 53.19 53.61 95.82 2552.13 1469.97 699.66 1294.12 1471.15 61.60 1.76 BP_ MWD+IFR+MS 36 3239.79 52.51 53.51 94.60 2609.26 1544.15 744.45 1354.78 1545.85 61.21 0.72 BP_ MWD+IFR+MS 37 3335.72 52.06 54.15 95.93 2667.94 1618.87 789.24 1416.04 1621.13 60.87 0.71 BP_ MWD+IFR+MS • 38 3431.23 54.46 54.37 95.51 2725.07 1694.32 833.94 1478.16 1697.18 60.57 2.52 BP_ MWD+IFR+MS 39 3527.24 54.30 54.59 96.01 2780.99 1771.32 879.28 1541.69 1774.80 60.30 0.25 BP_ MWD+IFR+MS 40 3589.94 53.61 54.05 62.70 2817.88 1821.31 908.85 1582.87 1825.23 60.14 1.30 BP_ MWD+IFR+MS 41 3708.88 52.59 53.69 118.94 2889.29 1914.97 964.93 1659.69 1919.80 59.83 0.89 BP_ MWD+IFR+MS 42 3805.20 52.55 53.96 96.32 2947.84 1990.28 1010.08 1721.43 1995.89 59.60 0.23 BP_ MWD+IFR+MS 43 3900.17 52.65 55.33 94.97 3005.52 2064.74 1053.73 1782.96 2071.06 59.42 1.15 BP_ MWD+IFR+MS 44 3998.55 52.62 55.11 98.38 3065.23 2142.03 1098.33 1847.18 2149.05 59.26 0.18 BP_ MWD+IFR+MS 45 4087.73 52.82 53.83 89.18 3119.25 2212.03 1139.57 1904.93 2219.76 59.11 1.16 BP_ MWD+IFR+MS 46 4183.81 52.86 53.01 96.08 3177.28 2287.33 1185.20 1966.41 2295.97 58.92 0.68 BP_ MWD+IFR+MS 47 4278.82 52.92 51.95 95.01 3234.61 2361.59 1231.34 2026.51 2371.27 58.72 0.89 BP_ MWD+IFR+MS 48 4375.01 52.97 51.96 96.19 3292.57 2436.70 1278.65 2086.96 2447.52 58.50 0.05 BP_ MWD+IFR+MS 49 4470.18 52.03 51.48 95.17 3350.51 2510.50 1325.43 2146.23 2522.51 58.30 1.07 BP_ MWD+IFR+MS 50 4565.47 52.27 51.69 95.29 3408.97 2584.02 1372.18 2205.19 2597.25 58.11 0.31 BP_ MWD+IFR+MS 51 4660.63 52.62 52.48 95.16 3466.98 2657.86 1418.53 2264.70 2672.29 57.94 0.75 BP_ MWD+IFR+MS • 52 4762.44 52.25 53.22 101.81 3529.05 2737.06 1467.27 2329.02 2752.68 57.79 0.68 BP_ MWD+IFR+MS 53 4858.64 52.25 53.84 96.20 3587.94 2811.89 1512.48 2390.19 2828.54 57.67 0.51 BP_ MWD+IFR+MS 54 4954.11 52.52 54.44 95.47 3646.21 2886.42 1556.78 2451.48 2904.02 57.58 0.57 BP_ MWD+IFR+MS 55 5049.70 52.23 54.33 95.59 3704.57 2961.08 1600.87 2513.03 2979.61 57.50 0.32 BP_ MWD+IFR+MS 56 5145.96 52.17 54.19 96.26 3763.57 3036.07 1645.30 2574.77 3055.56 57.42 0.13 BP_ MWD+IFR+MS 57 5241.70 52.02 54.53 95.74 3822.39 3110.57 1689.31 2636.16 3130.99 57.35 0.32 BP_ MWD+IFR+MS 58 5337.86 52.38 54.47 96.16 3881.32 3185.53 1733.44 2698.02 3206.88 57.28 0.38 BP_ MWD+IFR+MS 59 5433.69 52.25 54.95 95.83 3939.91 3260.40 1777.25 2759.92 3282.65 57.22 0.42 BP_ MWD+IFR+MS 60 5529.07 52.73 55.77 95.38 3997.98 3335.22 1820.25 2822.17 3358.26 57.18 0.85 BP_ MWD+IFR+MS SCHLLTMBERGER Survey Report 16-Dec-2006 10:34:58 Page 4 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (f t) (f t) (f t) (f t) (ft) (ft) (deg) 100f) type (deg) 61 5624.94 52.76 55.14 95.87 4056.02 3410.70 1863.52 2885.02 3434.54 57.14 0.52 BP _MWD+IFR+MS 62 5720.14 52.43 54.10 95.20 4113.85 3485.33 1907.31 2946.68 3510.09 57.09 0.93 BP _MWD+IFR+MS 63 5815.15 52.69 53.75 95.01 4171.61 3559.63 1951.73 3007.65 3585.41 57.02 0.40 BP _MWD+IFR+MS 64 5910.82 52.83 53.54 95.67 4229.50 3634.58 1996.88 3068.99 3661.45 56.95 0.23 BP _MWD+IFR+MS 65 6006.44 52.36 53.11 95.62 4287.59 3709.24 2042.24 3129.91 3737.25 56.88 0.61 BP _MWD+IFR+MS 66 6101.92 52.79 53.46 95.48 4345.61 3783.77 2087.57 3190.69 3812.93 56.80 0.54 BP _MWD+IFR+MS • 67 6197.56 52.37 53.52 95.64 4403.73 3858.48 2132.77 3251.74 3888.77 56.74 0.44 BP _MWD+IFR+MS 68 6293.14 52.23 53.40 95.58 4462.18 3932.86 2177.79 3312.50 3964.27 56.68 0.18 BP _MWD+IFR+MS 69 6389.43 52.20 53.52 96.29 4521.18 4007.70 2223.10 3373.64 4040.25 56.62 0.10 BP _MWD+IFR+MS 70 6485.12 52.21 53.24 95.69 4579.82 4082.04 2268.20 3434.33 4115.75 56.56 0.23 BP _MWD+IFR+MS 71 6581.00 52.54 53.57 95.88 4638.35 4156.71 2313.48 3495.30 4191.57 56.50 0.44 BP _MWD+IFR+MS 72 6675.72 52.84 53.98 94.72 4695.77 423.0.88 2358.00 3556.07 4266.83 56.45 0.47 BP _MWD+IFR+MS 73 6771.66 53.00 53.50 95.94 4753.61 4306.22 2403.27 3617.79 4343.28 56.40 0.43 BP _MWD+IFR+MS 74 6867.98 54.60 55.16 96.32 4810.50 4382.86 2448.58 3680.94 4420.95 56.37 2.17 BP _MWD+IFR+MS 75 6963.03 58.27 57.21 95.05 4863.04 4461.33 2492.62 3746.74 4500.13 56.37 4.26 BP _MWD+IFR+MS 76 7060.04 62.59 57.60 97.01 4910.91 4545.14 2538.05 3817.81 4584.47 56.38 4.47 BP _MWD+IFR+MS 77 7155.89 65.52 55.13 95.85 4952.84 4630.57 2585.80 3889.54 4670.65 56.38 3.84 BP _MWD+IFR+MS 78 7250.97 65.34 53.47 95.08 4992.38 4715.82 2636.26 3959.76 4757.06 56.35 1.60 BP _MWD+IFR+MS 79 7346.28 64.43 51.47 95.31 5032.84 4800.41 2688.82 4028.20 4843.15 56.28 2.13 BP _MWD+IFR+MS 80 7442.09 63.47 51.03 95.81 5074.91 4884.40 2742.70 4095.33 4928.90 56.19 1.08 BP _MWD+IFR+MS 81 7536.64 62.28 50.16 94.55 5118.02 4966.29 2796.11 4160.35 5012.66 56.10 1.50 BP _MWD+IFR+MS 82 7632.69 62.42 49.10 96.05 5162.59 5048.74 2851.22 4225.17 5097.21 55.99 0.99 BP _MWD+IFR+MS 83 7727.06 62.43 48.27 94.37 5206.28 5129.46 2906.44 4288.00 5180.19 55.87 0.78 BP _MWD+IFR+MS 84 7822.83 62.41 48.54 95.77 5250.62 5211.27 2962.80 4351.48 5264.37 55.75 0.25 BP _MWD+IFR+MS 85 7918.81 62.17 49.77 95.98 5295.25 5293.44 3018.37 4415.76 5348.78 55,65 1.16 BP _MWD+IFR+MS 86 8014.38 62.10 50.63 95.57 5339.92 5375.52 3072.45 4480.67 5432.90 55.56 0.80 BP_MWD+IFR+MS 87 8110.12 62.46 50.90 95.74 5384.45 5458.06 3126.06 4546.31 5517.35 55.49 0.45 BP _MWD+IFR+MS 88 8206.44 62.25 50.27 96.32 5429.15 5541.09 3180.23 4612.23 5602.37 55.41 0.62 BP _MWD+IFR+MS 89 8302.03 62.27 50.70 95.59 5473.64 5623.39 3234.06 4677.50 5686.67 55.34 0.40 BP _MWD+IFR+MS 90 8397.65 62.33 51.12 95.62 5518.09 5705.89 3287.44 4743.21 5771.08 55.27 0.39 BP _MWD+IFR+MS ~. SCHLUMBERGER Survey Report 16-Dec-2006 10:34:58 Page 5 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8493.23 60.63 55.10 95.58 5563.74 5788.35 3337.86 4810.34 5854.97 55.24 4.07 BP _MWD+IFR+MS 92 8588.45 57.99 60.75 95.22 5612.36 5869.73 3381.36 4879.65 5936.71 55.28 5.81 BP _MWD+IFR+MS 93 8684.80 56.51 66.85 96.35 5664.52 5950.70 3417.14 4952.28 6016.81 55.39 5.54 BP _MWD+IFR+MS 94 8779.83 54.74 73.40 95.03 5718.21 6028.60 3443.82 5025.96 6092.64 55.58 5.98 BP _MWD+IFR+MS 95 8875.57 55.12 76.04 95.74 5773.23 6105.55 3464.47 5101.54 6166.71 55.82 2.29 BP _MWD+IFR+MS 96 8970.90 54.99 79.41 95.33 5827.84 6181.41 3481.08 5177.88 6239.26 56.09 2.90 BP _MWD+IFR+MS 97 9066.76 55.19 81.94 95.86 5882.71 6256.67 3493.81 5255.44 6310.81 56.38 2.17 BP _MWD+IFR+MS 98 9162.32 54.40 85.25 95.56 5937.81 6330.16 3502.53 5333.01 6380.34 56.70 2.95 BP _MWD+IFR+MS 99 9257.90 51.67 86.36 95.58 5995.28 6401.01 3508.13 5409.17 6447.18 57.03 3.00 BP _MWD+IFR+MS 100 9354.31 49.39 89.25 96.41 6056.57 6469.04 3511.01 5483.52 6511.23 57.37 3.31 BP _MWD+IFR+MS 101 9449.03 48.95 93.69 94.72 6118.51 6532.55 3509.18 5555.13 6570.68 57.72 3.58 BP _MWD+IFR+MS 102 9540.43 48.98 100.03 91.40 6178.56 6590.34 3500.95 5623.51 6624.24 58.10 5.23 BP _MWD+IFR+MS 103 9635.91 47.20 107.01 95.48 6242.37 6645.04 3484.42 5692.53 6674.29 58.53 5.75 BP _MWD+IFR+MS 104 9731.84 46.68 117.47 95.93 6307.97 6691.52 3457.99 5757.24 6715.92 59.01 7.98 BP _MWD+IFR+MS 105 9827.40 48.32 124.50 95.56 6372.57 6729.70 3421.71 5817.54 6749.22 59.54 5.69 BP _MWD+IFR+MS 106 9922.63 49.00 128.39 95.23 6435.48 6762.64 3379.25 5875.03 6777.56 60.09 3.15 BP _MWD+IFR+MS 107 10017.92 50.26 132.75 95.29 6497.22 6791.35 3332.03 5930.13 6802.13 60.67 3.73 BP _MWD+IFR+MS 108 10114.26 50.93 136.05 96.34 6558.39 6816.17 3279.95 5983.30 6823.34 61.27 2.74 BP _MWD+IFR+MS 109 10210.14 53.43 139.80 95.88 6617.19 6836.96 3223.73 6034.00 6841.17 61.89 4.04 BP _MWD+IFR+MS 110 10305.43 55.40 139.50 95.29 6672.64 6856.03 3164.67 6084.17 6858.01 62.52 2.08 BP _MWD+IFR+MS 111 10400.69 55.36 141.18 95.26 6726.76 6874.41 3104.33 6134.20 6874.98 63.16 1.45 BP _MWD+IFR+MS • 112 10496.74 55.35 141.06 96.05 6781.36 6891.88 3042.81 6183.80 6891.89 63.80 0.10 BP _MWD+IFR+MS 113 10592.59 54.50 140.83 95.85 6836.44 6909.46 2981.90 6233.23 6909.76 64.43 0.91 BP _MWD+IFR+MS 114 10616.58 54.04 141.74 23.99 6850.45 6913.71 2966.71 6245.41 6914.22 64.59 3.63 BP _MWD+IFR+MS 115 10685.00 54.04 141.74 68.42 6890.63 6925.37 2923.22 6279.70 6926.75 65.04 0.00 Projected to TD [(c)2006 IDEAL ID10_2C_01] d -~ -~ w SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Prudhoe Bay Well ...................... V-122PB2 API number ...............: 50-029-23328-71 Engineer .................: St. Amour Rig :...................... Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: ------------------ Mean Sea Level Driller's Pipe Tally 55.15 ft N/A (Top Drive) 82.85 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 87.27 degrees 30-Dec-2006 20:41:32 Page 1 of 2 Spud date ................. 05-Dec-06 Last survey date.........: 29-Dec-06 Total accepted surveys...: 11 MD of first survey.......: 13458.41 ft MD of last survey........: 13819.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............. 05-Dec-2006 Magnetic field strength..: 57581.65 GAMA Magnetic dec (+E/W-).....: 24.04 degrees Magnetic dip .............. 80.86 degrees ----- MWD survey Reference Criteria --------- Reference G ............... 1002.68 meal Reference H ..............: 57630.00 GAMA Reference Dip ............: 80.88 degrees Tolerance of G...........: (+/-) 2.50 meal Tolerance of H...........: (+/-)300.00 GAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.85 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.85 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • • ovzvo~ • r: Schlum~erger Schlumberger-OCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # c1~- l ~~' ~ ~~l3 log Description NO. 4114 Company: Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Aurora Borealis Orion Date BL Color CD Z-100 10672336 LDWG OH EDIT WIRELINE 12102105 2 t U-122 11536192 CH EDIT USIT PDC-GR 07/01107 t 1 5-124 11485868 USIT 11/08106 1 V-214 11212898 U51T 11/02106 1 S-121 11366505 MEM PROD PROFILE 11/06/06 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) tnc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2830 ~,.__ ,..-~ .. _~.. .. _- _.. _.,..,.: r,.-..,, ATTN: Beth I .__., ~ ~ Received bv~ .~ ,~-~•r ~ F~,,~ F i • • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska- Inc. Dispatched To: Well No V-122 (PB1, P62) Date Dispatched Installation/Rig Nabors 9ES Dispatched By: Christine Mahnken 4-Jan-07 Emil Guliyev Data No Of Prints No of Floppies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division J M_ ~(~ ~~ 2525 Gambell Street, Suite 400 Anchorage, Alaska 99501 nroselC~3slb.com Fax:907-567-8317 LWD Log DeliveryV1.1, 10-02-03 ~- FRANK H. MURKOWSKI, GOVERNOR Scott Kolstad Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. 7`" AVENUE, SUITE 100 ANCHORAGE, ALASKA 995013539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-122 BP Exploration (Alaska) Inc. Permit No: 206-147 Surface Location: 4711' FSL, 1546' FEL, SEC. 11, T11N, Rl lE, UM Bottomhole Location: 4330' FSL, 1084' FWL, SEC. 07, T11N, R12E, UM Dear Mr. Kolstad: Enclosed is the approved application for permit to drill the above referenced development well. This approval supercedes and replaces the approval dated October 17, 2006 and the permit issued on that date is hereby cancelled. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness a required test, contact the Commission's petroleum field inspector at (907 659 3607 (pager). J~io.~K. N DATED this day of November, 2006 cc: Department of Fish & Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. - W G/k- is (t-( 1...0 0 4 STATE OF ALASKA ~~nn ALASKA OIL AND GAS CONSERVATION C~I~Af~IIIPF'06 _. PERMIT TO D~ ~~I ~, ~~~ ~:u9„~, ~~o/2sros, Change Target 20 AAC 25.005 ~ ~, ~ i~~a~~~ 1 a. Type of work ® Drill ^Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ StrBtigraphic Test ®Development Oil ^ Single Zone 1 c. pecify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU V-122 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14445 TVD 6692 12. Field /Pool(s): Prudhoe Bay Field /Borealis 4a. Location of Well (Governmental Section): Surface: 4711' FSL 1546' FEL 11 T11N SEC R11E UM (As Planned) 7. Property Designation: ADL 047450 Pool , , , . , , Top of Productive Horizon: 2640' FSL, 4545' FWL, SEC. 01, T11N, R11E, UM 8. Land Use Permit: 13. Approximate Spud te: Novemb 15, 006 Total Depth: 4330' FSL, 1084' FWL, SEC. 07, T11N, R12E, UM 9. Acres in Property: 2560 14. Distance to Nea Property: 16,700' 4b. Location of Well (State Base Plane Coordinates): Surface: x-' 590756 y-' 5969961 Zone-ASP4 10. KB Elevation Plan (Height above GL): 83.7 feet 15. Distance to Nearest Well Within Pool: 454' 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole An te: 93 de rees 17. Maximum Anticipated Pressures in psig (see 20 035) Downhole: 3413 Surface: 738 18. Casin P `ram: S ecifi f' n To - ttin h -Bo ttom uanti of C nt .f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 42" 20" 91.5# H-40 Weld 80' urface Surface 110' 110' 260 sx Arctic Set A rox. 12-1/4" 9-5/8" 40# L-80 BTC 3459' Surface Surface 3459' 2753' 566 sx Arcticset Lite 207 sx'G' - /4" 7" 2 L-80 T -II 0 ' dace Surface 3577' S Be ow 8-3/4" 7" 26# L-80 BTC-M 5567 5000' 3577 10567 6805' 442 sx LiteCrete 144 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 4285' 10160' 6564' 14445' 6692' 541 sx Class 'G' ° 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): asing Length Size ement Volume MD TVD Conductor /Structural Surface Intermediate Pro i n Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ^ 80P Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name S Kolstad for Robert Tirpack Title Senior Drilling Engineer / spared Name/Number: Si nature "' ~ Phone 564-4166 Date ~~ ~ Terris Hubble, 564-4628 Commission tJse Onl Permit To Drill Numb r: 206-147 API Number: 50-029-23328-00-00 Permit Approval See cover letter for Date: other re it ments Conditions of Approval: 11__ If box is ch11ecked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: T2 S r ~ ~ ~~ t'r T-° 3S 0 ~ ~ ~~ ' Samples Req'd: ^ Yes ~' No ud Log Req'd: ^ Yes ~ No L HZS Measures: ~ Yes ^ No coon I Survey Req'd: ,Yes ^ No her: -L l ~ ~tn-Q i S ~ f° ~. wv s u rw~- e'~ 2 ~ ~L 2S . 0 3 S ~-~ Ll ~ , ~. ~t,/ 0 ~ - ~ ~ yu t/~ Date ~ ~j O VED BY THE COMMISSION '°~ ,COMMISSIONER Form 10-401 Revised 12/2005 ^ ~ ~ ~ ~ ~ ~ ~ Submit In Duplicate • Well Name: V-122 Drill and Complete Plan Summary T e of Well service / roducer / in'ector : Producer Surface Location: X=590755.9 Y=5969960.5 As-Staked 569' FNL, 1546.5' FEL ,Sec. 11, T11 N, R11 E Target Locations: X=596805 Y=5,973,245 To Kur aruk: 2639' FSL, 735' FEL ,Sec. 1, T11 N, R11 E Bottom Hole Location: X =598,670 Y = 5,969,680 949' FNL, 1084' FWL ,Sec. 7, T11 N, R12E Ri Nabors 9ES Estimated Start Date: 11/15/2006 O eratin da s to com lete: 28.1 MD: 14,445' TVD: 6692' RT/GL: 28.5' RKB: 83.7' Well Desi n conventional, slimhole, etc.: Ultra Slimhole Horizontal Ob'ective: Producer in the Kuparuk River C Sand Directional: Ver. Anadrill PB1 P5 / Horizontal P10 KOP: ~d0` Maximum Hole An le: 93 deg at 10,900' MD Close Approach Wells: All wells pass major risk criteria. The nearest well is: V-100 -15.5' ctr-ctr C«~ 454' None IFR-MS corrected surve s will be used for sunre validation. Distance to Nearest Property 16,700' to PBU boundary Line• Logging Program: Surface Drilling: MWD / GR Open Hole: None Cased Hole: None Intermediate Hole Drilling: MWD/GR/RES/PWD/DEN/NEU Open Hole: None Cased Hole: Production Hole Drilling: MWD/GR/RES/DEN/NEU Open Hole: None Cased Hole: V-122 Permit application Page 1 • Mud Program: 12 1/a" Surface Hole: Fresh Water Surface Hole Mud Density Viscosity seconds Yield Point Ib/100ft~ API FL mis/30min PH Initial 8.5 - 9.2 250-300 50 - 70 15 - 20 8.5 - 9.5 Base PF to to SV 9.0 - 9.5 250-300 30 - 45 < 10 8.5 - 9.5 SV toTD 9.5 max 250-300 20 - 40 < 10 8.5 - 9.5 8 3/a "Intermediate Hole: LSND Interval Density Tau o YP PV pH API 10' Gel (ppg) Filtrate Upper 9. 4-7 25-30 10-15 8.5-9.5 6-10 10 Interval Top of HRZ 10. 3-7 20-25 10-15 8.5-9.5 4-6 10 to TD 6 1/8" Production Hole: FloProNT Interval Density YP PV LSRV HTHP FL pH Window to TD 9.5 20 - 24 10 - 20 20 - 30K 4-6 9 Casin /Tubin Pro ram: Hole Size Csg/ Tb O.D. Wt/Ft Grade Conn Length Top MD/TVD Btm MD/TVD bkb 42" Insulated 20" 91.5# H-40 WLD 80' GL 110'/110' 12 1/a" 9 5/8" 40# L-80 BTC 3459' G L 3459' / 2753' 8 3/a" 7" 26# L-80 TC-II 5000' GL 5000' / 3577' 8 3/a" 7" 26# L-80 BTC-m 5567' 5000' / 3577' 10567' / 6805' 6 1 /8" 4 '/z" 12.6# L-80 I BT-M 4285' 10160'/6564' 14445' / 6692' Tubing 3 ~/z" 9.3# 13 Cr IBT-M 6966' 3200'/ 2600' 10166' / 6564' Tubin 4 ~/z" 12.6# 13 Cr Vam To 3200' GL 3200' / 2600' Integrity Testing: Test Point Depth Test Type EMW Surface Casing Shoe 20' - 50' from surface shoe LOT Expected >12.5 Intermediate Casing Shoe 20' - 50' from intermediate FIT 11.5 ppg shoe V-122 Permit application Page 2 • Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as a contin enc if cement is not circulated to surface. Casing Size 9-5/8" Surface String Basis: Lead: Based on conductor set at 110', 1791' of annulus in the permafrost C~2 250% excess and 1060' p n hole from top of tail slurry to base permafrost @ 30% excess. Lead TOC: To urfa Tail: Based on MD above the casing shoe + 30% excess + 80' shoe track volume. Tail TOC: At 2959' MD Total Cement Volume: Lead 448 bbl / 2514 ft / s of Schlumberger Arctic SET Lite 10.7 and /sk. Tail 42 bbl / 238 ft / 1 s of Schlumberger Neat"G" at 15.8 aaa and .17 f/sk. Intermediate Casin Casina Size 7" Intermediate Basis: Lead: Based on 5341' of open hole with 30% excess. Lead TOC: At 4459' MD (1000' MD below surface casing shoe, 1277' MD above the top of the Ma. Tail: Based on 80' shoe track volume and 767' of open hole (to 500' MD above top Kuparuk formation) with 30% excess. Tail TOC: At 9,800' MD Total Cement Volume: Lead 1 bl / 1044 ft / 44~Psks of Dowell LiteCrete at 11.5 ppg at cf/sk Tail bbl / 167.#t, /, 4_ ks of Dowell Premium `G' w/ latex at 15.8 Production Liner: Casinq Size 4'/z" liner Basis: Based on fully cemented liner + 50% excess, 80' shoe track volume, and 200' DP x casin annulus. Total Cement Volume: Tail 113 bbl / 633 ft~ 4 ks of Schlumberger class "G" at 15.8 aaa and /f 1 cf/sk with latex. V-122 Permit application Page 3 • • (7) Formation Tops(TVDss) and Estimated Pore Pressures Est. Formation To s Uncertaint Commercial Hydrocarbo n Bearin Est. Pore Press. Est. Pore Press. Formation (TVDss) (eet) (Yes/No) (Psi) (PPg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells Gl 245 +/- 30' no 111 8.8 SV6 890 +/- 30' no 405 8.8 EOCU 1465 +/- 30' no 667 8.8 SV5 1571 +/- 30' no 715 8.8 BPRF 1.690 +/- 30' no 769 8.8 SV4 1700 +/- 30' Gash drates 774 8.8 Fault #1 2070 +/- 100' M.D. -see fault section for details. 942 8.8 SV3 (faulted to) 2070 +/- 30' Gash drates 942 8.8 SV2 2190 +/- 50' Gash drates 996 8.8 SVl 2525 +/- 50' Gash drates 1149 8.8 UG4 2820 +/- 50' Thin coal 1283 8.8 UG4A 2855 +/- 50' Heavy Oil: 2855-3080' SS 1299 8.8 UG3 3076 +/- 50' Thin coals 1400 8.8 UGl 3775 +/- 50' Heavy Oil: 3775-3950' SS 1718 8.8 UG MA 4045 +/- 50' no 1820 8.7 UG MB1 4100 +/- 50' no 1845 8.7 UG MB2 4160 +/- 50' Poss. Heavy oil down to 4180' SS 1872 8.7 SB Na 4290 +/- 50' no 1909 8.6 SB_Nb 4315 no 1920 8.6 SB_OA 4455 +/- 50' es 1982 8.6 SB OBA 4515 +/- 50' es 2009 8.6 SB_OBd 4670 +/- 50' es 2078 8.6 SB_OBf base 4820 +/- 50' no 2145 8.6 Fault #2 (intra Colville) 4870 +/- 100' M.D. -see fault section for details. CM2 5160 +/- 100' no CMl 5885 +/- 50' no Fault #3 6160 +/- 150' M.D. -see fault section for details. THRZ 6360 +/- 50' no Kalubik 6500 +/- 50' no K-1 6530 +/- 50' no V-122 Permit application Page 4 • • TKC4 6575 +/- 50' es 3100 9.1 TKB/LCU 6665 +/- 50' no 3413 9.8 TKB3 6695 +/- 50' no 3422 9.8 TKB2 6715 +/- 50' no 3429 9.8 TD 6722 TKB1 6740 +/- 50' no 3436 9.8 TKA6 6770 +/- 50' no 3446 9.8 TKAS 6780 +/- 50' no 3449 9.8 OWC 6655 FWL 6680 Well TD Criteria (ie ??ft TVD, ??ft Rathole, etc.) Comments Pilot hole: 100' MD below TKB/LCU, MWD. Horizontal section: Drill according to well plan to TD. Early TD will be considered if top structure goes below OWC. Avoid Kalubik penetration at TD if possible. PBTD 85' MD from TD. SV, Ugnu, Schrader Bluff, TKB & TKA6 pore pressures estimated from V-100 MDT V-122 Permit application Page 5 • • Well Control: Surface hole will be drilled with diverter. The intermediate and production hole well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOP equipment will be tested to 3500 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval- s Maximum anticipated BHP: • Maximum surface pressure: Production Interval- • Maximum anticipated BHP: • Maximum surface pressure: 3413 psi C«3 6749' TVD -Kuparuk River B 2738 psi Cc~ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) 3100 psi C~ 6653' TVD -Kuparuk River C Sand 2434 psi @ surface (based on BHP and a full column of gas from TD C 0.10 psi/ft) • Planned BOP test pressure: 250 / 3500 psi • Planned completion fluid: 9.5 ppg brine / 6.8 ppg diesel (2,200' TVD) Kick Tolerance / Inte r Testin Summar Table Casing / Casing Test Maximum Mud Exp Pore LOT / Interval Pressure Influx Weight Press FIT Volume Surface Casing / 3500 psi 77 (based on 10.9 9.8 LOT 8-3/a" hole 12.5 LOT Ku aruk B Intermediate 3500 psi Infinite 9.5 9.1 11.5 Casing / 6-1/8" (Kuparuk C) (FIT) hole Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for disposal. Haul all Class I wastes to Pad 3 for disposal. V-122 Permit application Page 6 i r DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" insulated conductor is installed. 1. Weld an FMC landing ring for the FMC Ultra slimhole well head on the conductor. 2. If necessary, level the pad and prepare location for rig move. Rig Operations: 1. MIRU Nabors 9ES. 2. Nipple up and function test diverter. PU 4" DP as required and stand back in derrick. 3. MU 12'/a" drilling assembly with MWD/GR/Dir and drill surface hole to approximately 200' TVD below the SV1 Sand top. 4. Run and cement the 9-5/8", 40# surface casing back to surface. 5. ND diverter and NU casing /tubing head. NU BOPS and test. 6. MU 8-3/4" drilling assembly with MWD/GR/DIR/RES/PWD and RIH to float collar. Test the 9-5/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to LSND drilling fluid. Drill 20' - 50' of new formation and perform Leak Off Test. 8. Drill to +/-100' above the HRZ, ensure mud is in condition and up to required weight and perform short trips as needed. Ensure Pre-Reservoir meeting is held high lighting kick tolerance and detection prior to entering the Kuparuk. 9. Drill ahead to TD in the Kuparuk. 10. Condition hole for running 7" 26# intermediate casing. 11. Run and cement the 7" intermediate casing. 12. PU whipstock and window mills. RIH and set Whipstock. 13. Test the 7" casing to 3500 psi for 30 minutes. 14. Displace well to FloPro and mill window. 15. MU 6-1/8" build drilling assembly. 16. Drill 20' - 50' of new formation and perform Formation Integrity Test. Drill the build section of 17°/100' DLS. 17. MU 6-1/8"drilling assembly with MWD/GR/DIR/RES/DEN/NEU. 18. Drill horizontally to TD with the assistance of the on-site Geologist. 19. Run 4'/z", L-80, liner with liner hanger and packer. 20. Cement liner in place. 21. DPC perforate 2000'. 22. Freeze protect the 7" x 9-5/8" annulus as required. Record formation breakdown pressure on the Morning Report. 23. Run the 3'/z" x 4 ~/z" 13Cr gas lift completion. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear the GLM shear valve and install TWC. Test below to 1000 psi. 24. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Remove TWC. 25. RU hot oil truck and freeze protect well to 2,200' TVD with diesel. 26. Rig down and move off. Post-Rig Work• 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull shear valve, install GLV in all of the other mandrels as per the PE. V-122 Permit application Page 7 Drilling Critical Issues PO5T THIS NOTICE IN THE DOGHOUSE I. Well Control /Reservoir Pressures: Interval Psi (EMW) TVDss Schrader, OA 1982 (8.6) 4,455 Ku aruk C sand 3,100 (9.1) 6,575 Hydrates and Shallow gas: A. Gas Hydrates are expected at V-Pad near the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation /Breathing: A. Lost circulation risk is considered low in the horiz. section and low to mod. in the up hole intervals. IV. Kick Tolerance /Integrity Testing: A. The 9 5/s" casing will be cemented to surface. The 7" casing will be cemented to 1000' MD from the surface casing shoe. Kick Tolerance / Inte it Testis Summa Table Casing / Casing Test Maximum Mud Exp Pore LOT / Interval Pressure Influx Weight Press FIT Volume Surface Casing 3500 psi 77 (based on 10.9 9.8 LOT / 8-3/a" hole 12.5 LOT Ku aruk B Intermediate 3500 psi Infinite 9.5 9.1 11.5 Casing / 6-1/8" (Kuparuk C) (FIT) hole NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string V-Pad development wells may have "kick tolerances" in the 25 bbl range. A heightened awareness of kick detection, pre-job planning and trip tank calibration will be essential while drilling/tripping the intermediate/production intervals. V. Stuck Pipe A. There could be differential sticking across the Schrader Bluff while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide A. V-Pad is not designated as an HZS site, however Standard Operating Procedures for HZS precautions should be followed at all times. No measurable HZS is being produced from the formation at this time. However 10 ppm is measured regularly at V-Pad as a result of the use of Ivishak gas lift gas. All V-Pad gas lift wells will likely have HZS in this concentration. Note that all injection has been with produced water not seawater. HZS levels are expected to remain low until the water flood matures. H?,S Summa Table WeII N me H2S Level Date of Readin #1 Closest SHL Well H25 Level V-117 20 Au -06 #2 Closest SHL Well H2S Level V-100 10 est #1 Closest BHL Well H2S Level V-106A 110 Jul-06 #2 Closest BHL Well H2S Level V-111 10 Au -06 Max. Recorded H2S on Pad/Facilit V-117 180 Dec-OS V-122 Permit application Page 8 • VII. Faults • Formation Where Encounter Fault MD Intersect TVDss Intersect Est. Throw Throw Direction Uncertain Fault #1 - SV3 2417 -2070 -90' West +/- 100' MD Fault #2 -Colville 7544 -4870 +100' East +/- 100' MD Fault #3 -Lower CM I 9717 -6 160 60' West +/- 100' MD CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION V-122 Permit application Page 9 TREE= 4-1/18" WELLHEAD = FMC ACTUATOR = LEO KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = ~~ 2 p ro p o s e d S NOTES: ***CHROME TBC~""* °@' 20" CONDUCTOR ~ 9-5/8" TAM PORT COLLAR 2600' 4-1/2" HES X NIP, ID = 3.813" " " ' 9-5/8 CSG, 40#, L-80 BTC, ID = 8.835 3459 ^-3400' 4-1/2" X 3-1/2" XO, ID = 2.992" 4-1/2" TBG, 12.6#, 13Cr-80, VamTop .0152 bpf, ID = 3.958" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 2600 MMG DMY 5 3400 MMG shear " " 4 4100 MMG DMY 3-1/2 TBG, 9.2#, 13CR-80, .0087 bpf, ID = 2.992 3 4800 MMG DMY 2 5500 MMG DMY 1 tbd MMG DMY 7" CSG, 26#, L-80 TCII, .0383 bpf, ID = 6.276" Minimum ID =2.813" @' 3-1/2" X Nipple MILLED WINDOW (7") 7" BKR WHIPSTOCK 10310' 7" HES EZSV 7" CSG, 26#, L-80 BTC, .0383 bpf, ID = 6.276" 10567' PERFORATION SUMMARY REF LOG: LWD ON A NGLE AT TOP PERF: @ ' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 10010' 3-1/2" HES X NIP, ID = 2.813" 10030' 3-1/2" HES SYMPHONY GAUGE CARRIER 10070' 7" X 3-1 /2" BKR PrernierPKR, ID = " 10090' 3-1 /2" HES X NIP, ID = 2.813" 10110' 3-1/2" HES X NIP, ID = 2.813" 10160' 7" X 5" BKR ZXP PKR 8~ LNR HGR w /TIEBACK SLV, ID = 4.410" 10166' 4-1/2" WLEG, iD = 4.000" 10170' S" X 4-1 /2" XO, ID = 3.920" 11690' "MARKER JT W/ RA TAG 12375' "MARKER JT W/ RA TAG 13065• I MARKERJT I W/ RA TAG PBTD 14365' 1 /2" LNR, 12.6 #, L-80 IBT-M, ID = 3.958" -r DATE REV BY COMMENTS DATE REV BY COMMENTS Borealis Unit 10/26/06 SRK Proposed Completion WELL: V-122 PH2MIT No: API No: 50-029- SEC 11, T11N, R11E, 569' SNL & 1546' WEL BP Exploration (Alaska) • • Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance to the provisions of 20 AAC 25.035 (e}(10)C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, except when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadverten#ly closed on a tool joint during routine operations.} The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after it has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact regulation language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next welibore entry, to the required working pressure specified in the approved Permit to Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e}{f 0)C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 (d){4} THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e}(1} WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Auber# at the AOGCC. The test requirement in the regulation is intended to apply to ram type equipment only. The AOGCC understands that ram type BOP's are utilized for purposes other than well contro! in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h} PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036(() THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(g) WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the BOPE requirements in (e) of this section if the variance provides at least an equally effective means of well contro(; by V-122P61 (P5) Proposal Schlumberger Report Date: October 25, 2006 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 63.895° Field: Prudhoe Bay Unit - WOA /, Vertical Section Origin: y N 0.000 ft, E 0.000 ft Structure 1 Slot: V-Pad /Plan V-122 (S-U) I ~~ s uM TVD Reference Datum: Rotary Table Well: ~~ Plan V-122 (S-U) S~ TVD Reference Elevation: 82.40 ft relative to MSL Borehole: Plan V-122P61 ~e~ Sea Bed 1 Ground Level Elevation: 53.90 ft relatlve to MSL UWIIAPI#: 500292332870 Magnetic Declination: 23.855° Survey Name! Date: V-122PB1 (P5) /October 25, 2006 Total Field Strength: 57629.830 nT Tort I AHD I DDI 1 ERD ratio: 148.649° / 7523.93 ft / 6.240 / 1.10E Magnetic Dip: 80.884° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 10, 2006 Location LatlLong: N 70.32766153, W 149.26397224 Magnetic Declination Model: BGGM 2006 Location Grid NIE YIX: N 5969960.620 ftUS, E 590756.010 ftUS North Reference: True North Grid Convergence Angle: X0.69307249° Total Corr Mag North -> True North: +23.855° Grid Scale factor: 0.99990936 Local Coordinates Referenced To: Well Head Measured Vertical Gravity Comments Inclination Azimuth SutrSea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft d d 1100 ft de 100 ft de 100 ft ftUS ftUS K I t U.UU 0.UU 35U.UU -t3Z.4U U.UU O.OU 0.00 0.UU --- U.UU 0.00 OAO 596996U.6Z 59U756.U1 N /U.3"1/66153 W 149.26397224 KOP Bld 1.5/100 300.00 0.00 350.00 217.60 300.00 0.00 0.00 0.00 HS 0.00 0.00 0.00 5969960.62 590756.01 N 70.32766153 W 149.26397224 G1 327.40 0.41 350.00 245.00 327.40 0.03 0.10 -0.02 HS 1.50 1.50 0.00 5969960.72 590755.99 N 70.32766179 W 149.26397238 400.00 1.50 350.00 317.59 399.99 0.36 1.29 -0.23 HS 1.50 1.50 0.00 5969961.90 590755.77 N 70.32766504 W 149.26397408 500.00 2.99 350.00 417.51 499.91 1.45 5.14 -0.91 HS 1.50 1.50 0.00 5969965.75 590755.04 N 70.32767559 W 149.26397960 600.00 4.49 350.00 517.29 599.69 3.26 11.57 -2.04 HS 1.50 1.50 0.00 5969972.17 590753.83 N 70.32769315 W 149.26398879 Crv 3.5/100 634.00 5.00 350.00 551.18 633.58 4.04 14.34 -2.53 90.OOR 1.50 1.50 0.00 5969974.93 590753.31 N 70.32770071 W 149.26399275 700.00 5.51 14.84 616.91 699.31 6.91 20.24 -2.22 65.26R 3.50 0.77 37.63 5969980.83 590753.55 N 70.32771682 W 149.26399023 800.00 7.66 39.42 716.26 798.66 16.13 30.03 3.24 40.84R 3.50 2.15 24.58 5969990.68 590758.89 N 70.32774356 W 149.26394593 900.00 10.56 52.00 815.00 897.40 31.16 40.82 14.70 28.40R 3.50 2.90 12.58 5970001.61 590770.21 N 70.32777304 W 149.26385305 SV6 976.61 12.98 57.69 890.00 972.40 46.58 49.74 27.50 22.84R 3.50 3.16 7.42 5970010.68 590782.91 N 70.32779741 W 149.26 1000.00 13.74 59.03 912.75 995.15 51.96 52.57 32.10 21.53R 3.50 3.24 5.72 5970013.57 590787.47 3 N 70.32780515 W 149.263 1100.00 17.04 63.41 1009.16 1091.56 78.45 65.24 55.39 17.30R 3.50 3.30 4.39 5970026.52 590810.60 N 70.32783977 W 149.263 1200.00 20.41 66.40 1103.86 1186.26 110.53 78.78 84.48 14.48R 3.50 3.37 2.99 5970040.41 590839.52 N 70.32787676 W 149.26328720 1300.00 23.81 68.56 1196.49 1278.89 148.08 93.15 119.26 12.47R 3.50 3.40 2.17 5970055.19 590874.12 N 70.32791599 W 149.26300519 1400.00 27.24 70.21 1286.72 1369.12 190.95 108.27 159.59 10.98R 3.50 3.43 1.65 5970070.81 590914.27 N 70.32795732 W 149.26267810 1500.00 30.68 71.52 1374.20 1456.60 239.00 124.11 205.34 9.83R 3.50 3.44 1.31 5970087.19 590959.81 N 70.32800058 W 149.26230715 1600.00 34.13 72.59 1458.62 1541.02 292.04 140.60 256.32 8.94R 3.50 3.45 1.06 5970104.30 591010.59 N 70.32804563 W 149.26189371 EOCU 1607.73 34.40 72.66 1465.00 1547.40 296.34 141.90 260.47 8.87R 3.50 3.46 0.96 5970105.65 591014.72 N 70.32804917 W 149.26186005 1700.00 37.60 73.48 1539.64 1622.04 349.87 157.68 312.35 8.21 R 3.50 3.46 0.88 5970122.05 591066.40 N 70.32809228 W 149.26143934 SV5 1739.95 38.98 73.79 1571.00 1653.40 374.27 164.65 336.10 7.96R 3.50 3.47 0.79 5970129.31 591090.06 N70.32811132 W149.26124675 1800.00 41.06 74.24 1616.99 1699.39 412.28 175.28 373.22 7.62R 3.50 3.47 0.74 5970140.39 591127.05 N 70.32814036 W 149.26094572 End Crv 1846.08 42.66 74.55 1651.30 1733.70 442.51 183.55 402.84 --- 3.50 3.47 0.69 5970149.02 591156.56 N 70.32816295 W 149.26070557 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\Plan V-122 (S-U)1PIan V-122PB1\V-122P81 (P5) Generated 10/25/2006 11:50 AM Page 1 of 3 Measured Vertical Gravity Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de d 1100 ft de 100 ft de 1100 ft ftUS ftUS oasC rcnn lo~o./V 4L.vU /4.0:7 IOyU.VU I//L.4U 4//AO 7JJ.V0 4J /.L7 --- U.UU U.VU V.UV 0a/U 106.`J3 0`Jll`JV.61 IV /U.JL070tl`JU W 74J.LOU4ZOtlZ Crv 3.5/100 1912.30 42.66 74.55 1700.00 1782.40 486.61 195.51 446.09 HS 0.00 0.00 0.00 5970161.49 591199.66 N 70.32819560 W 149.26035479 SV4 1912.31 42.66 74.55 1700.01 1782.41 486.62 195.51 446.10 62.46E 3.50 1.62 -4.58 5970161.49 591199.67 N 70.32819561 W 149.26035472 2000.00 44.15 70.64 1763.73 1846.13 546.16 213.55 503.56 59.62E 3.50 1.70 -4.46 5970180.22 591256.91 N 70.32824488 W 149.25988875 2100.00 46.00 66.44 1834.36 1916.76 616.70 239.47 569.41 56.65E 3.50 1.85 -4.20 5970206.94 591322.43 N 70.32831569 W 149.25935478 2200.00 47.99. 62.51 1902.58 1984.98 689.79 271.01 635.35 53.97E 3.50 1.99 -3.94 5970239.26 591387.98 N 70.32840182 W 149.25882000 2300.00 50.11 58.82 1968.13 2050.53 765.16 308.03 701.15 51.55E 3.50 2.12 -3.69 5970277.08 591453.32 N 70.32850295 W 149.25828640 2400.00 52.34 55.36 2030.77 2113.17 842.54 350.40 766.56 49.38E 3.50 2.23 -3.46 5970320.24 591518.20 N 70.32861869 W 149.25775598 End Crv 2422.74 52.86 54.60 2044.58 2126.98 860.39 360.77 781.35 --- 3.50 2.29 -3.33 5970330.75 591532.87 N 70.32864702 W 149.25763599 SV3 2464.84 52.86 54.60 2070.00 2152.40 893.50 380.21 808.70 --- 0.00 0.00 0.00 5970350.55 591559.98 N 70.32870011 W 149.25741418 SV2 2663.58 52.86 54.60 2190.00 2272.40 1049.85 471.98 937.84 --- 0.00 0.00 0.00 5970443.87 591687.98 N 70.32895079 W 149.2563 SV1 3218.40 52.86 54.60 2525.00 2607.40 1486.31 728.19 1298.34 --- 0.00 0.00 0.00 5970704.39 592045.32 N 70.32965057 W 149.2534 9-5/8" Csg Pt 3458.55 52.86 54.60 2670.00 2752.40 1675.22 839.08 1454.37 --- 0.00 0.00 0.00 5970817.15 592200.00 N 70.32995345 W 149.25217746 UG4 3706.97 52.86 54.60 2820.00 2902.40 1870.66 953.80 1615.79 --- 0.00 0.00 0.00 5970933.81 592360.00 N 70.33026676 W 149.25086818 UG4A 3764.94 52.86 54.60 2855.00 2937.40 1916.26 980.57 1653.46 --- 0.00 0.00 0.00 5970961.03 592397.33 N 70.33033986 W 149.25056267 UG3 4130.96 52.86 54.60 3076.00 3158.40 2204.19 1149.59 1891.28 --- 0.00 0.00 0.00 5971132.89 592633.07 N 70.33080145 W 149.24863358 UG1 5288.63 52.86 54.60 3775.00 3857.40 3114.89 1684.18 2643.49 --- 0.00 0.00 0.00 5971676.49 593378.69 N 70.33226128 W 149.24253149 Ma 5735.80 52.86 54.60 4045.00 4127.40 3466.67 1890.67 2934.04 --- 0.00 0.00 0.00 5971886.46 593666.70 N 70.33282510 W 149.24017422 Mb1 5826.89 52.86 54.60 4100.00 4182.40 3538.32 1932.73 2993.23 --- 0.00 0.00 0.00 5971929.23 593725.37 N 70.33293995 W 149.23969402 Mb2 5926.26 52.86 54.60 4160.00 4242.40 3616.50 1978.62 3057.80 --- 0.00 0.00 0.00 5971975.89 593789.37 N 70.33306524 W 149.23917016 Na 6141.56 52.86 54.60 4290.00 4372.40 3785.87 2078.04 3197.69 --- 0.00 0.00 0.00 5972076.99 593928.04 N 70.33333669 W 149.23803511 Nb 6182.97 52.86 54.60 4315.00 4397.40 3818.44 2097.16 3224.59 --- 0.00 0.00 0.00 5972096.43 593954.70 N 70.33338890 W 149.23781683 OA 6414.83 52.86 54.60 4455.00 4537.40 4000.84 2204.23 3375.25 --- 0.00 0.00 0.00 5972205.31 594104.04 N 70.33368122 W 149.23659443 Oea 6514.20 52.86 54.60 4515.00 4597.40 4079.01 2250.12 3439.82 --- 0.00 0.00 0.00 5972251.97 594168.04 N 70.33380650 W 149.23607053 Crv 3/100 6657.06 52.86 54.60 4601.26 4683.66 4191.40 2316.09 3532.64 15.66E 0.00 0.00 0.00 5972319.05 594260.05 N 70.33398661 W 149.23531733 6700.00 54.10 54.17 4626.81 4709.21 4225.43 2336.18 3560.69 15.40E 3.00 2.89 -1.00 5972339.48 594287.86 N 70.33404147 W 149.23508974 OBd 6775.67 56.29 53.45 4670.00 4752.40 4286.59 2372.87 3610.83 14.99E 3.00 2.90 -0.96 5972376.77 594337.54 N 70.33414163 W 149.23468293 6800.00 56.99 53.22 4683.38 4765.78 4306.57 2385.01 3627.13 14.86E 3.00 2.90 -0.93 5972389.10 594353.69 N 70.33417477 W 149.23455065 V-122P61 Tgt Schrader 6869.10 59.00 52.60 4720.00 4802.40 4364.10 2420.35 3673.87 15.85E 3.00 2.90 -0.90 5972425.00 594400.00 N 70.33427125 W 149.2341 6900.00 59.89 52.31 4735.71 4818.11 4390.17 2436.56 3694.97 15.70E 3.00 2.89 -0.95 5972441.47 594420.89 N 70.33431552 W 149.234 End Crv 6987.19 62.41 51.51 4777.77 4860.17 4464.87 2483.68 3755.06 --- 3.00 2.89 -0.92 5972489.31 594480.41 N 70.33444416 W 149.233 OBf Base 7078.38 62.41 51.51 4820.00 4902.40 4543.81 2533.98 3818.32 --- 0.00 0.00 0.00 5972540.36 594543.05 N 70.33458149 W 149.23299920 Fault Crossing 7186.34 62.41 51.51 4870.00 4952.40 4637.27 2593.54 3893.22 --- 0.00 0.00 0.00 5972600.82 594617.21 N 70.33474409 W 149.23239139 CM2 7812.56 62.41 51.51 5160.00 5242.40 5179.37 2938.98 4327.63 --- 0.00 0.00 0.00 5972951.45 595047.38 N 70.33568714 W 149.22886592 Crv 4/100 8463.49 62.41 51.51 5461.45 5543.85 5742.87 3298.05 4779.20 121.33R 0.00 0.00 0.00 5973315.93 595494.52 N 70.33666736 W 149.22520090 8500.00 61.66 52.93 5478.57 5560.97 5774.45 3317.81 4804.68 120.66R 4.00 -2.06 3.88 5973335.99 595519.76 N 70.33672128 W 149.22499408 8600.00 59.68 56.91 5527.57 5609.97 5860.53 3367.92 4875.98 118.71 R 4.00 -1.98 3.99 5973386.96 595590.45 N 70.33685806 W 149.22441538 8700.00 57.82 61.06 5579.46 5661.86 5945.67 3411.98 4949.20 116.56R 4.00 -1.86 4.15 5973431.90 595663.13 N 70.33697829 W 149.22382109 8800.00 56.11 65.37 5633.99 5716.39 6029.46 3449.77 5024.00 114.20R 4.00 -1.72 4.31 5973470.59 595737.45 N 70.33708141 W 149.22321412 8900.00 54.55 69.85 5690.89 5773.29 6111.50 3481.12 5099.99 111.66R 4.00 -1.56 4.48 5973502.84 595813.05 N 70.33716689 W 149.22259742 9000.00 53.16 74.49 5749.90 5832.30 6191.37 3505.86 5176.82 108.91 R 4.00 -1.39 4.65 5973528.51 595889.57 N 70.33723433 W 149.22197401 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\Plan V-122 (S-U)\Plan V-122PB1\V-122P61 (P5) Generated 10/25/2006 11:50 AM Page 2 of 3 Measured Vertical Gravity Comments Inclination Azimuth Sub•Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de d 1100 ft de 100 ft de 100 ft ftUS ftUS yI UV .VV 51. yb /y .3U 5251 U ./1 5t5y3.11 ti11i25 ./U 3513.15/ 5154.11 1U5.99K 4.UU -1.1U 4.151 59/354/.411 5959titi .(i1 N /U.:i3/1834U W 149.11134ti91 9200 .00 50. 96 84 .25 5873 .04 5955.44 6343 .10 3535.08 5331.47 102 .90R 4.00 -1.00 4.95 5973559.59 596043 .84 N 70 .33731386 W 149.22071918 CM1 9218. 95 50. 80 85. 21 5885. 00 5967.40 6356. 85 3536.43 5346.11 102. 30R 4.00 -0.87 5.03 5973561.12 596058. 46 N 70. 33731752 W 149.22060039 9300 .00 50. 18 89 .33 5936 .58 6018.98 6414 ,22 3539.41 5408.54 99 .68R 4.00 -0.76 5.09 5973564.86 596120 .85 N 70 .33732556 W 149.22009390 9400 .00 49. 62 94 .51 6001 .02 6083.42 6481 .71 3536.86 5484.94 96 .34R 4.00 -0.56 5.18 5973563.24 596197 .27 N 70 .33731844 W 149.21947410 9500 .00 49. 30 99 .76 6066 .04 6148.44 6545 .23 3527.44 5560.30 92 .93R 4.00 -0.32 5.25 5973554.72 596272 .72 N 70 .33729254 W 149.21886280 9600 .00 49. 21 105 .04 6131 .34 6213.74 6604 .48 3511.18 5634.25 89 .48R 4.00 -0.08 5.28 5973539.37 596346 .86 N 70 .33724798 W 149.21826298 Fault Crossing 9643. 89 49. 25 107. 36 6160. 00 6242.40 6629. 06 3501.91 5666.16 87. 97R 4.00 0.09 5.28 5973530.48 596378. 88 N 70. 33722259 W 149.21800413 9700 .00 49. 37 110 .31 6196 .59 6278.99 6659 .17 3488.18 5706.42 86 .04R 4.00 0.21 5.27 5973517.24 596419 .30 N 70 .33718499 W 149.21767758 9800 .00 49. 76 115 .54 6261 .47 6343.87 6709 .03 3458.54 5776.48 82 .64R 4.00 0.39 5.23 5973488.45 596489 .70 N 70 .33710386 W 149.21710944 9900 .00 50. 39 120 .69 6325 .67 6408.07 6753 .83 3422.40 5844.07 79 .34R 4.00 0.63 5.15 5973453.14 596557 .71 N 70 .33700500 W 149.2165 THRZ 9954. 09 50. 82 123. 44 6360. 00 6442.40 6775. 87 3400.21 5879.48 77. 60R 4.00 0.80 5.07 5973431.38 596593. 39 N 70. 33694431 W 149.21627417 10000 .00 51. 24 125. 74 6388 .88 6471.28 6793 .34 3379.95 5908.87 76 .15R 4.00 0.91 5.01 5973411.48 596623 .02 N 70 .33688888 W 149.21603592 10100 .00 52. 30 130. 65 6450 .78 6533.18 6827 .36 3331.38 5970.55 73 .11 R 4.00 1.06 4.91 5973363.67 596685 .28 N 70 .33675608 W 149.21553577 Kalubik 10181. 40 53. 31 134. 53 6500. 00 6582.40 6850. 90 3287.50 6018.27 70. 76R 4.00 1.24 4.77 5973320.37 596733. 52 N 70. 33663610 W 149.21514898 10200 .00 53. 56 135. 41 6511 .08 6593.48 6855 .74 3276.95 6028.83 70 .24R 4.00 1.34 4.69 5973309.94 596744 .21 N 70 .33660723 W 149.21506333 K-1 10232. 02 54. 00 136. 90 6530. 00 6612.40 6863. 62 3258.32 6046.73 69. 36R 4.00 1.38 4.65 5973291.53 596762. 33 N 70. 33655629 W 149.21491828 End Crv 10299 .91 55. 00 140. 00 6569 .43 6651.83 6878 .32 3216.96 6083.37 --- 4.00 1.47 4.57 5973250.62 596799 .47 N 70 .33644323 W 149.21462127 V-122PB1 Tgt 10300 .91 55. 00 140. 00 6570 .00 6652.40 6878 .52 3216.33 6083.90 --- 0.00 0.00 0.00 5973250.00 596800 .00 N 70 .33644151 W 149.21461701 TKC4 10309. 63 55. 00 140. 00 6575. 00 6657.40 6880. 23 3210.86 6088.49 --- 0.00 0.00 0.00 5973244.59 596804. 66 N 70. 33642656 W 149.21457981 10466 .54 55. 00 140 .00 6665 .00 6747.40 6911 .10 3112.40 6171.11 --- 0.00 0.00 0.00 5973147.14 596888 .45 N 70 .33615738 W 149.21391022 LCU l TKB 10466. 55 55. 00 140. 00 6665. 01 6747.41 6911. 10 3112.39 6171.12 --- 0.00 0.00 0.00 5973147.13 596888. 46 N 70. 33615735 W 149.21391015 TK83 10518. 84 55. 00 140. 00 6695. 00 6777.40 6921. 39 3079.58 6198.65 --- 0.00 0.00 0.00 5973114.66 596916. 38 N 70. 33606766 W 149.21368703 TK82 10553. 71 55. 00 140. 00 6715. 00 6797.40 6928. 25 3057.70 6217.01 --- 0.00 0.00 0.00 5973093.00 596935. 01 N 70. 33600784 W 149.21353824 10565. 91 55. 00 140. 00 6722. 00 6804.40 6930. 65 3050.04 6223.44 --- 0.00 0.00 0.00 5973085.42 596941. 52 N 70. 33598691 W 149.21348616 TD / 7" Csg Pt 10566 .54 55. 00 140 .00 6722 .36 6804.76 6930 .77 3049.65 6223.76 --- 0.00 0.00 0.00 5973085.04 596941 .86 N 70 .33598584 W 149.21348350 • WeIlDesign Ver SP 2.1 BId( doc40x_100) Plan V-122 (S-U)\Plan V-122 (S-U)\Plan V-122P61\V-122P61 (P5) Generated 10/25/2006 11:50 AM Page 3 of 3 b • P Schlumberger WELL FIELD STRUCTURE V-122P61 (P5) Prudhoe Bay Unit - WOA V-Pad Magnabc Pa~amalers 5utlace Lxd00n NADl] Abska filaio Planas.2om 0<. US Feet Mluellanooua Motlel BGGM 30LK Dip. 8088x' Date Oe<amber 10. 1000 let :1]019 J9562 RorMin9 598996362 M15 Grtl Conv .08930]le9' Slob Plan V~11215-UI NDReI Rotary Table 182 x011 above MSLI MaB Dec. •23855' FS 5I6298nT Lon Wt0.R 1550300 EasOng 590]56.0111U8 Scala Fad. 0959909J586 Plan. V~I11P61 IP5~ Srvy Dale Odo6ei 25. 2006 0 1200 2400 3600 4800 6000 7200 0 1200 2400 0 0 c (( 3600 m `~ >~ F- 4800 6000 7200 RTE ... ' .........................i..................................p..................................i..................................i..................................~...................................:.......... KOP Bld 1.5/100 crv asnoo _ ~d._.._.._.._.._.._.._ .-.._..-.._.._.._..-.._ _ ._.._.._..-..-.._.._.._ _.._.._.._.._.._.._..-. _ -.._.._..-..-.._.._.._ - _.._.._.._.._.._.._.._ - _. _ ....:.. ...............................:..................................:...................................1..................................7..................................4..................................i.......... End Crv ..i..-..-..- .~eFm......i......e........e..a......i..e.....e.......e...e....o..e.ee.......e.........e.ie.....e..................~.........e...e.....e.....ei....... End Crv _.. _.. _.._.._.. 3_ _ ._.._.._.._.._.._.._.._ _ ._.._.._....._.._..... _.._.._.._.._.._.._.._. _.._.._.._..-.._.._.._ _..-..-.._.._.._.._.._ _.._ ..*.._.._..-.._..-..-.._.._..r.._.._.._.._.._.._.. . ~i_.._.._.._.._.._.._.._.._s._.._.._.._.._.._.._.._..~._.._..-..-..-.._.._..-..y.._..-..~.._.._.._..-.._..*.._.._. ..~.._.._.._.._.._.._.._.._. ;r.._.._..-.._.._..-..-.._.;_.._.._.._.._.._.._.. _.. .,_.._.._.._..'Crv ~>TOD~._.._.._.._.._.._.._..-..~.._..-.._.._.._.._.._.._..r.._.._. n=a:nsan:aa•uniuia:i~nsnai:nrauarnasnariauanauar9^:iaus:a:a;: a:. s::::a:• ::ra:asa:::::a:ausas:wnak:ii:auauniaaa:aauia::insa: V•122R81 Tgt Schrader ..i.._.._.._.._.._..-..-..-..y..._..-..-........_.._..-.i_..-.............._.....-i•_.._.._.. _.. _.. _.. i._.._.._.._.._.._.._.._..i.._.. _.._.. _.._.._.._.._..r.._.._. apse ..i.._.._.._.._.._.._.._.._..i-.._.._.._..~..~..-..-..-.i_..-..-..-..-.._.._.._.._i._.. FeLult Cr~ssi~B_.._.. _i._.._.. .. _.._.._..CrvdH OO_._.._.._.._....._..i.._.._. Fault Crossing ..:V-i72pBi'fZ(. ..Iff. Eod Crv ::~::~::.::~::~::~::~::~::~:Z::.:._.._.._.._.._.._.._.:-_..-..-..-.._.._..-...1.. __.._...j. _.._..-_..-_..__.._..-:._.._::-::_.._..-..-..-.. ~.. _::~:: ~:: ~:: _. ._. ._.. _.._. ii;isiiiiiiiiiiiiiiiiiiiiiii~iiiiiiiiiiiiiiiiiiiiiiifiiiiiiiiiiiiiiiiiiiiiiiiiiij.iiiiiiiiiiiiiiiiiiiiiiii?iliiiiiiiiiiiiiiiiiiiiiiiii~iiiii:iiiii:iiiii 'i~jboi:ii TD / 7" Csg Pt V-12~2PB1 (PS 0 1200 2400 3600 4800 6000 72 Vertical Section (ft) Azim = 63.89°, Scale = 1(in):1200(ft) Origin = 0 N/-S, 0 E/-V 0 1200 2400 3600 4800 6000 7200 by Schlumberger WELL V-122P61 (P5) FIELD Prudhoe Bay Unit - WOA STRUCTURE V-Pad MaBOebc Parameters MoEel: BGGM 2006 Qp 60.66a• Map Dac: X23655° Date: Dewmber 10, 2006 FS'. 5]629.8 nT ace NP.D2] Alaska Sb1e Plains, Zore 00, US Fae1 La1 LocN]019 )9562 NeM1M1lnq 5869960.631105 Grq Cenv X0.6930]249' Lon W149 15 50 900 Eastinq. 590]56.01 ftU5 c[. 0.5899096566 Mncollanaous SbT. Plan V-12215-UI TVD Ret. RoNry Tabk 182.40ftabove MSLI PWn. V~132PB11P51 Srvy Date: October 25, 2006 0 800 1600 2400 3200 4000 4800 5600 6400 3200 n n 2400 Z 0 0 c ~ 1600 Ln 800 n 95/8" Csg Pt End Crv Crv 1.5/100 End Crv ........ .....CN 3:51100............... ...................................j....................... ........... t ..................................:..................................., RTE ~ KOP BIO 1.5/100 Fault Crossing Crv 4/100 :End Crv V-1P2P81 Tgt TD / 7"Csg PI ....:............. ....} ............. V-122P81 (PS) ..................... ~.................................. t..... .....................j..................................:..... ~ 800 1600 2400 3200 4000 c« W Scale = 1(in):800(ft) E »> 4800 5600 6400 3200 2400 1600 i 800 n BP Alaska Anticollision Report Company:.; BP AmoCO Date: 10/2512006 Tirne: 12:04:12 Page: l Meld: Prudhoe Bay Reference Site: PB V Pad Co-ordinate(NI;) Reference: Well: Plan V-122 (S-U), True North Reference Well: Plan V-122 (S-U) Vertical ("fVD) Reference: V-122 Plan S-U 82.4 Reference Wellpath: Plan V-122PB1 DU: Oracle NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM , Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: 28.50 to 10566.54 ft Scan Method: Trav Cylinder North Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath ~, Date: 8/19/2002 Validated: No Version: 6 i, Planned From To Survey Toolcode Tool Name ft ft 28.50 800.00 Planned: Plan #5 V1 GYD-GC-SS Gyrodata gyro single shots , ', 800.00 2200.00 Planned: Plan #5 V1 MWD MWD -Standard !i 800.00 3400.00 Planned: Plan #5 V1 MWD+IFR+MS MWD +IFR + Multi Station 3400.00 10566.54 Planned: Plan #5 V1 MWD+IFR+MS MWD +IFR + Multi Station ', Casing Points MD TVD Diameter Hole Size Name ft ft in in ', 3458.55 2752.40 9.625 12.250 9 5/8" ' 110566.54 6804.76 7.000 8.750 7" Summary <---------- ------- O£Yset Wellpath --------------> Refetence Offset '' Ctr-Ctr No-Go Allowable ' Site i~'ell Wellpath MD MD Distance Area Deviation Warning ' ft ft ft ft ft. I I PB V Pad Plan V-04 (N-O) Plan V-04 V2 Plan: Pla 690.48 680.00 190.58 12.99 177.59 Pass: Major Risk PB V Pad Plan V-121 (S-R) Plan V-121 V2 Plan: PI 1178.53 1195.00 38.72 19.56 19.16 Pass: Major Risk PB V Pad Plan V-205 (S-P) Plan V-205 V10 Plan: P 608.77 610.00 76.95 11.62 65.33 Pass: Major Risk 'i PB V Pad Plan V-205 (S-P) Plan V-205L1 OBa V5 PI 6694.81 11435.00 212.53 157.31 55.22 Pass: Major Risk PB V Pad Plan V-205 (S-P) Plan V-205L2 OA V6 Pla 608.77 610.00 76.95 11.62 65.33 Pass: Major Risk ', ~~ PB V Pad Plan V-217 (S-Q) Plan V-217 V2 Plan: PI 504.13 505.00 60.89 9.50 51.39 Pass: Major Risk PB V Pad V-01 V-01 V15 468.81 470.00 106.08 8.45 97.63 Pass: Major Risk ~', PB V Pad V-02 V-02 V12 770.09 780.00 270.79 13.05 257.74 Pass: Major Risk ', PB V Pad V-03 V-03 V7 1137.97 1050.00 129.72 18.18 111.54 Pass: Major Risk ', PB V Pad V-100 V-100 V7 453.62 455.00 15.44 7.68 7.76 Pass: Major Risk ~~ PB V Pad V-101 V-101 V7 659.07 650.00 343.82 10.99 332.83 Pass: Major Risk ~, PB V Pad V-102 V-102 V5 634.18 620.00 247.27 12.00 235.26 Pass: Major Risk ', ', PB V Pad V-103 V-103 V6 478.29 470.00 187.33 8.34 178.99 Pass: Major Risk I ', PB V Pad V-104 V-104 V13 685.37 680.00 294.10 11.49 282.62 Pass: Major Risk PB V Pad V-105 V-105 V13 848.96 855.00 169.91 14.12 155.78 Pass: Major Risk ,~ ', PB V Pad V-106 V-106 V10 710.91 700.00 181.09 11.33 169.76 Pass: Major Risk I~ ', PB V Pad V-106 V-106A V9 129.59 130.00 190.13 2.49 187.64 Pass: Major Risk ', PB V Pad V-106 V-106AP61 V6 129.59 130.00 190.13 2.49 187.64 Pass: Major Risk ', ', PB V Pad V-106 V-106AP62 V2 129.59 130.00 190.13 2.49 187.64 Pass: Major Risk PB V Pad V-106 V-106AP63 V2 129.59 130.00 190.13 2.49 187.64 Pass: Major Risk ~, PB V Pad V-107 V-107 V5 780.61 790.00 245.70 12.55 233.14 Pass: Major Risk PB V Pad V-108 V-108 V7 503.26 495.00 378.51 8.82 369.68 Pass: Major Risk j PB V Pad V-109 V-109 V2 659.59 665.00 283.08 10.91 272.17 Pass: Major Risk ', ', PB V Pad V-109 V-109P61 V5 659.59 665.00 283.08 10.91 272.17 Pass: Major Risk PB V Pad V-109 V-109P62 V2 659.59 665.00 283.08 10.91 272.17 Pass: Major Risk PB V Pad V-111 V-111 V25 1049.55 1045.00 130.34 17.77 112.56 Pass: Major Risk I ', PB V Pad V-111 V-111 P61 V8 1049.55 1045.00 130.34 17.77 112.56 Pass: Major Risk I ', PB V Pad V-111 V-111 PB2 V2 1049.55 1045.00 130.34 17.77 112.56 Pass: Major Risk I PB V Pad V-111 V-111 P63 V6 1049.55 1045.00 130.34 17.77 112.56 Pass: Major Risk I PB V Pad V-112 V-112 V7 330.66 330.00 341.40 6.14 335.26 Pass: Major Risk ', PB V Pad V-113 V-113 V6 474.22 475.00 312.35 7.52 304.82 Pass: Major Risk ', PB V Pad V-114 V-114 V5 335.38 335.00 251.00 5.80 245.20 Pass: Major Risk ', PB V Pad V-114 V-114A V4 335.38 335.00 251.00 5.80 245.20 Pass: Major Risk ', PB V Pad V-114 V-114APB1 V4 335.38 335.00 251.00 5.80 245.20 Pass: Major Risk PB V Pad V-114 V-114AP82 V2 335.38 335.00 251.00 5.80 245.20 Pass: Major Risk !, PB V Pad V-115 V-115 V5 329.42 330.00 47.49 5.59 41.90 Pass: Major Risk PB V Pad V-115 V-115PB1 V4 329.42 330.00 47.49 5.59 41.90 Pass: Major Risk ', PB V Pad V-117 V-117 V9 468.05 470.00 15.98 8.05 7.93 Pass: Major Risk PB V Pad V-117 V-117PB1 V6 468.05 470.00 15.98 8.05 7.93 Pass: Major Risk PB V Pad V-117 V-117P62 V6 468.05 470.00 15.98 8.05 7.93 Pass: Major Risk ', ', PB V Pad V-119 V-119 V13 646.58 650.00 266.19 11.41 254.78 Pass: Major Risk ~ BP Alaska Anticollision Report Company: BP Ampeo ~ Date: 1-0d25/2©06' Time: 12x04:12 Page: 2 Reid: Prudhoe Bay Reference Site: PB V Pad Co-ttrdnate(NE) Reference: Well: Plan V-122 (S-U), True North Reference Well: Plari V-122 (S-W) Vertical (TVD) Reference: V-122 P4ar S-U 82.4 Reference Wellpath: Plan V-122P61 Db: Oracle Summary ------------ -----'gffset W'ellpath -- ---------> Reference t?ffset Ctr-Ctr ho-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB V Pad V-120 V-120 V5 245.30 245.00 186.81 4.53 182.28 Pass. Major Risk PB V Pad V-201 V-201 V8 586.16 575.00 264.82 9.84 254.99 Pass: Major Risk PB V Pad V-202 V-202 V9 712.53 715.00 305.78 12.44 293.34 Pass: Major Risk PB V Pad V-202 V-202L1 V5 712.53 715.00 305.78 12.40 293.39 Pass: Major Risk PB V Pad V-202 V-202L2 V5 712.53 715.00 305.78 12.40 293.39 Pass: Major Risk PB V Pad V-203 V-203 V18 640.14 630.00 367.99 12.23 355.76 Pass: Major Risk PB V Pad V-203 V-203L1 V6 2685.30 7715.00 5962.60 No Offset Errors PB V Pad V-203 V-203L2 V4 1800.00 6965.00 5667.01 No Offset Errors PB V Pad V-203 V-203L3 V3 1800.00 6915.00 5632.53 No Offset Errors PB V Pad V-203 V-203L4 V3 640.14 630.00 367.99 12.23 355.76 Pass: Major Risk PB V Pad V-204 V-204 V2 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204L1 V2 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204L1 P61 V6 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204L2 V2 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204L2P61 V5 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204L3 V3 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204P61 V9 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-204 V-204P62 V2 643.16 645.00 232.97 11.63 221.34 Pass: Major Risk PB V Pad V-210 V-210 V9 266.27 265.00 308.98 4.70 304.28 Pass: Major Risk PB V Pad V-211 V-211 V5 251.49 250.00 359.33 4.40 354.93 Pass: Major Risk PB V Pad V-212 V-212 V7 4337.71 4350.00 215.82 81.37 134.45 Pass: Major Risk PB V Pad V-213 V-213 V5 244.55 245.00 31.31 4.57 26.74 Pass: Major Risk PB V Pad V-213 V-213PB1 V5 244.55 245.00 31.31 4.57 26.74 Pass: Major Risk PB V Pad V-214 Plan V-214 V1 Plan: PI 685.36 680.00 331.09 12.38 318.71 Pass: Major Risk PB V Pad V-214 V-214PB1 V2 709.30 705.00 327.95 15.38 312.58 Pass: Major Risk PB V Pad V-214 V-214PB2 V3 683.86 675.00 331.42 12.54 318.88 Pass: Major Risk PB V Pad V-214 V-214PB3 V5 683.86 675.00 331.42 12.54 318.88 Pass: Major Risk PB V Pad V-214 V-214P64 V2 683.86 675.00 331.42 12.54 318.88 Pass: Major Risk PB V Pad V-216 V-216 V8 230.78 230.00 182.37 4.31 178.06 Pass: Major Risk PB V Pad V-221 V-221 V6 682.14 670.00 216.04 14.33 201.72 Pass: Major Risk • • FieldPrudhoe Bay SitePB V Pad Well:Plan V-122 (S-U) WellpathElan V-122PB1 313 300 200 100 0 2 100 200 300 -3 1 3 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t Target: V- l 22PB 1 Tgt Alt Site: PB V Pad Well: Plan V-122 (S-U) Drilling Target Conf.: 95% Based on: Planned Program Description: Vertical Depth: 6570.00 ft be low Mean Sea Level Map Northing: 5973250.00 ft Local +N/-S: 3216.32 ft Map Easting : 596800.00 ft Local +E/-W: 6083.89 ft Latitude: 70°20' 11.189N Longitude: 149° 12'52.621 W Shape: Circle Radius: 200 ft _ _ _ ' 3000 ~, 3500 i 34-00 i i 3300 ~~ 3200 3100 '~ 3000 '~ ' 2000 ~ 0 0 0 0 0 0 0 0 p D o 0 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ D ~ ~o ~ D `~ `~ ~ by Schtumberger V-122 1P101 Proaosal Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA StructurelSlot: Well: V-Pad/PIanV-122(S-U) ~~~I~~ Plan V-122 (S-U) Borehole: ~ Plan V-122 UWIIAPI#: 500292332800 Survey Name 1 Date: V-122 (P10) /October 25, 2006 Tort 1 AHD 1 DDI / ERD ratio: 248.927° / 11432.45 ft / 6.786 / 1.70C Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LaULong: N 70.32766153, W 149.26397224 Location Grid NIE YIX: N 5969960.620 ftUS, E 590756.010 ftUS Grid Convergence Angle: +0.69307249° Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 153.070° Vertical Section Origin: N 0.000 ft, E 0.000 ft l TVD Reference Datum: Rotary Table y TVD Reference Elevation: 82.40 ft relative to MSL Sea Bed 1 Ground Level Elevation: 53.90 ft relative to MSL Magnetic Declination: 23.855° Total Field Strength: 57629.841 nT Magnetic Dip: 80.884° Declination Date: December 10, 2006 Magnetic Declination Model: BGGM 2006 North Reference: True North Total Corr Mag North •> True North: +23.855° Measured Vertical Gravity Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de de 1100 k d 100 ft d 100 ft ftUS ftUS IOp WnIpS[OCK lU3U`J.63 bb.UU '14U.UU 65/b.UU ti65/.4U -lUb.1y 311U.tf6 bU2S2f.4y 3b.UUK U.UU U.UU U.UU by/JZ44.5`J by6ttU4.tili N /U.33ti42tibti W 14y.214b/ytfl Base Whipstock 10322.63 56.71 141.43 6582.30 6664.70 -94.68 3202.53 6095.30 --- 16.00 13.17 10.98 5973236.34 596811.57 N 70.33640379 W 149.21452461 Crv 18/100 10334.63 56.71 141.43 6588.88 6671.28 -84.86 3194.69 6101.56 1.04R 0.00 0.00 0.00 5973228.58 596817.91 N 70.33638235 W 149.21447392 10350.00 59.48 141.49 6597.01 6679.41 -72.07 3184.48 6109.69 1.01 R 18.00 18.00 0.38 5973218.47 596826.17 N 70.33635445 W 149.21440802 10400.00 68.48 141.66 6618.92 6701.32 -28.09 3149.32 6137.58 0.94R 18.00 18.00 0.34 5973183.65 596854.49 N 70.33625832 W 149.21418195 10450.00 77.48 141.81 6633.54 6715.94 18.74 3111.82 6167.16 0.89R 18.00 18.00 0.30 5973146.52 596884.51 N 70.33615582 W 149.21394224 10500.00 86.48 141.95 6640.51 6722.91 67.26 3072.91 6197.70 0.87R 18.00 18.00 0.28 5973107.98 596915.51 N 70.33604945 W 149.21369480 Crv 10/100 10519.58 90.00 142.00 6641.12 6723.52 86.46 3057.50 6209.75 88.OOR 18.00 18.00 0.27 5973092.72 596927.75 N 70.33600731 W 149.21359711 10550.00 90.11 145.04 6641.09 6723.49 116.46 3033.04 6227.84 88.OOR 10.00 0.35 9.99 5973068.48 596946.13 N 70.33594046 W 149.21345058 End Crv 10598.17 90.27 149.85 6640.93 6723.33 164.38 2992.45 6253.75 --- 10.00 0.35 9.99 5973028.21 596972.53 N 70.33582951 W 149.21324065 Crv 8/100 10619.44 90.27 149.85 6640.83 6723.23 185.62 2974.06 6264.43 89.85R 0.00 0.00 0.00 5973009.95 596983.43 N 70.33577924 W 149.21 10650.00 90.28 152.30 6640.68 6723.08 216.16 2947.31 6279.21 89.87R 8.00 0.02 8.00 5972983.39 596998.53 3 N 70.33570614 W 149.213 10700.00 90.29 156.30 6640.43 6722.83 266.13 2902.27 6300.89 89.89R 8.00 0.02 8.00 5972938.62 597020.75 N 70.33558303 W 149.2128 10750.00 90.30 160.30 6640.18 6722.58 315.92 2855.82 6319.37 89.91 R 8.00 0.01 8.00 5972892.40 597039.79 N 70.33545611 W 149.21270923 V-122 Tgt 1 Alt 10783.76 90.30 163.00 6640.00 6722.40 349.30 2823.78 6330.00 75.40R 8.00 0.01 8.00 5972860.49 597050.81 N 70.33536854 W 149.21262323 10800.00 90.63 164.26 6639.87 6722.27 365.26 2808.20 6334.58 75.41 R 8.00 2.02 7.74 5972844.97 597055.57 N 70.33532598 W 149.21258622 10850.00 91.63 168.13 6638.88 6721.28 413.93 2759.67 6346.50 75.49R 8.00 2.01 7.74 5972796.59 597068.08 N 70.33519335 W 149.21248979 10900.00 92.63 172.01 6637.02 6719.42 461.71 2710.46 6355.12 75.63R 8.00 2.00 7.75 5972747.49 597077.29 N 70.33505891 W 149.21242023 End Crv 10900.45 92.64 172.04 6637.00 6719.40 462.13 2710.01 6355.18 --- 8.00 1.98 7.76 5972747.05 597077.36 N 70.33505768 W 149.21241972 Crv 8/100 11859.26 92.64 172.04 6592.85 6675.25 1367.90 1761.45 6487.81 105.32E 0.00 0.00 0.00 5971800.24 597221.44 N 70.33246598 W 149.21135056 11900.00 91.77 168.90 6591.29 6673.69 1406.74 1721.31 6494.55 105.44E 8.00 -2.12 -7.72 5971760.19 597228.66 N 70.33235630 W 149.21129617 11950.00 90.71 165.04 6590.20 6672.60 1455.26 1672.61 6505.82 105.52E 8.00 -2.14 -7.71 5971711.64 597240.52 N 70.33222325 W 149.21120510 V-122 Tgt 2 Alt 11982.96 90.00 162.50 6590.00 6672.40 1487.64 1640.97 6515.03 105.02E 8.00 -2.14 -7.71 5971680.12 597250.11 N 70.33213679 W 149.21113062 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)1PIan V-122 (S-U)\Plan V-122\V-122 (P10) Generated 10/25/2006 12:17 PM Page 1 of 2 Measured Vertical Gravity Comments Inclination Azimuth Sub~Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de de 1100 ft de 100 ft d 100 ft ftUS ftUS i[uuu.uu tly.b5 lbl.l23 bbyV. Ub bti/'[.45 15U4.4tf 1ti[4./tS ti5[U.:i4 1U5.U"[L tS.UU -[.U/ -/./;i by/ltitiS.yy 5y/Lb5.ti1 N /U .;i:i"LUyLb4 W 14y.111U8/(i(i 12050.00 88.61 157.32 6590. 81 6673.21 1554.18 1578.04 6538.05 104.96E 8.00 -2.07 -7.73 5971617.47 597273.89 N 70. 33196480 W 149.21094437 12100.00 87.58 153.45 6592. 47 6674.87 1604.10 1532.62 6558.86 104.83E 8.00 -2.06 -7.74 5971572.31 597295.24 N 70. 33184067 W 149.21077591 12150.00 86.57 149.58 6595. 03 6677.43 1654.00 1488.73 6582.67 104.64E 8.00 -2.04 -7.75 5971528.72 597319.58 N 70. 33172073 W 149.21058311 End Crv 12159.67 86.37 148.83 6595. 62 6678.02 1663.63 1480.44 6587.61 --- 8.00 -2.02 -7.76 5971520.50 597324.62 N 70. 33169807 W 149.21054309 Crv 8/100 12527.93 86.37 148.83 6618. 94 6701.34 2030.14 1165.99 6777.84 19.51 L 0.00 0.00 0.00 5971208.40 597518.62 N 70. 33083855 W 149.20900252 V-122 Tgt 3 Alt 12549.54 88.00 148.25 6620. 00 6702.40 2051.66 1147.58 6789.11 20.37E 8.00 7.54 -2.67 5971190.12 597530.11 N 70. 33078821 W 149.20891128 12550.00 88.03 148.24 6620. 02 6702.42 2052.12 1147.19 6789.35 20.36E 8.00 7.50 -2.79 5971189.73 597530.36 N 70. 33078715 W 149.20890932 End Crv 12571.59 89.65 147.64 6620. 45 6702.85 2073.62 1128.90 6800.80 --- 8.00 7.50 -2.78 5971171.58 597542.03 N 70. 33073715 W 149.20881654 Crv 8/100 13310.31 89.65 147.64 6624. 92 6707.32 2809.00 504.94 7196.23 80.79E 0.00 0.00 0.00 5970552.51 597944.94 N 70. 32903154 W 149.20561445 V-122 Tgt 4 Alt 13337.36 90.00 145.50 6625. 00 6707.40 2835.88 482.36 7211.13 80.57E 8.00 1.28 -7.90 5970530.12 597960.11 N 70. 32896983 W 149.205 13350.00 90.17 144.50 6624. 98 6707.38 2848.39 472.01 7218.38 80.57E 8.00 1.31 -7.89 5970519.85 597967.49 N 70. 4 32894152 W 149.2054 End Crv 13398.31 90.80 140.69 6624. 58 6706.98 2895.89 433.63 7247.72 --- 8.00 1.31 -7.89 5970481.84 597997.29 N 70. 32883662 W 149.20519740 TD / 4-1/2" Lnr 14445.15 90.80 140.69 6610. 00 6692.40 3918.29 -376.24 7910.86 --- 0.00 0.00 0.00 5969680.12 598670.11 N 70. 32662227 W 149.19982667 • WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-122 (S-U)\Plan V-122 (S-U)\Plan V-122\V-122 (P10) Generated 10/25/2006 12:17 PM Page 2 of 2 by J Schlumberger WELL FIELD STRUCTURE V-122 (P10) Prudhoe Bay Unit - WOA V-Pad Maprretq Pammelers 6uRace Localron NAD2] Alaska Sete Plares. Zore W. US Peal Mrxellaroaus Motlel: BGGM 2006 Dip. 60.884' pato. December l0, ]006 Lat NI01939.562 NoMinp 59699fi0.fi2 flU5 Grq cony: .06930]249• SIOL Plan V-12215-UI NDReY Rotary Table 162.40flabovo MSLI Mag Dec: a23855' FS' S]6298ni Lon: W1491550.300 EasOng 590]56.01 flU5 Scale Fact: 09999093566 Plan. V~1221P101 Brvy Dale: October 25.2CW 6000 O O C 6600 N f0 U 7200 -600 0 600 1200 1800 2400 3000 3600 4200 -122PB7 (P5) ~ :Top Whipstock Base Whipstock Crv 18/100 V-122 T• 1 Att Y-122 T t 2 Att p-122 Tgt J AI ~. F.__.._.. ~ 9 ~ V-122 Tgt 4 AI[ TD / 0-i/2" Lnr Crv 10/100 End Qrv ~ ~ ~ C[v B/100 End CrvCrv 8/100 Entl Crv Crv 8/100 End Crv ... ..-.. _ ...................... ......~s::a:~a:~ :~s:~::~a:~_:~_::......•.::1:•.~s:~~:~ai~{aiiiiraisii'i ..s.._.._.._.._.._ _.._.._ _ . ._ .._. .._.._.. ._.._.._.. _..s..-.._.._1.-..-. ._.. z.~a::•1:~1: a '.~a:~siisii• ;." .. ~..-..-..-..-.._.._.._.. _. - _ -.y_.._.._.._.._.._.._.._..-i._.._..-..-..-.._..-.. _.. K.._.._.._.._ - - - _ - . - - -122 (P70) •; - V-122PB11P ) find Crv Crv 8/100 -600 0 600 1200 1800 2400 3000 3600 4200 Vertical Section (ft) Azim = 153.07°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-V • 6000 6600 7200 • b P Schlumberger WELL FIF LD STRUCTURE V-122 (P10) Prudhoe Bay Unit - WOA V-Pad Magne rc rame a fiurlace loci ion i r.Fe .,r.. ~. i r.rne... ~n~ 5 Fne Mrxcc an Motlal PaBGGM 2006 Drp d0 dd4' ~ ~. r. ri-r 101005 ~ 0 9]9582 r ~ r ri.4 .069:Y1]249' PO P an V-11215-UI NDRaY Rotary Table f8340 Ra6ove MSLI S of Mag Oec •23855 ~ Wlaa 1550100 ~ - 09999093568 Plan. V~1]31P101 Srvy Dab OGOEe~26. 2006 5400 6000 6600 7200 7800 3600 3000 2400 n A A Z ~ 1800 0 0 c m m U ~ 1200 v v v 600 0 -600 5400 6000 6600 7200 7800 «< W Scale = 1(in):600(ft) E »> 3600 3000 2400 1800 1200 600 0 -600 • BP Alaska Anticollision Report I Company: BP Amoco E'ield: Prudhoe Bay Reference Site: PB V Pad '' Reference Well: Plan V-122 (S-U) Reference Wellpath: Plan V-122 NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 5.00 ft Depth Range: 10309.00 to 14445.15 ft Maximum Radius:10000.00 ft - - --- Survey Program for Definitive Wellpath Date: 10/25/2006 Validated: No ', Planned From To Survey ft ft Date: 10/25/2006 'hime: 12:37:14 Page: 1 Co-ordinate(NE) Reference: Well: Plan V-122 (S-U), True North Vertical (TVD) Reference: V-122 Plan S-U 82.4 Dh: Oracle Reference: Principal Plan & PLANNED PROGRAM Error Model: ISCWSA Ellipse Scan Method: Trav Cylinder North Error Surface: Ellipse + Casing ', Version: 6 Toolcode Tool Name 28.50 800.00 Planned: Plan #5 V1 (0) GYD-GC-SS Gyrodata gyro single shots ', 800.00 3400.00 Planned: Plan #5 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station 3400.00 10309.62 Planned: Plan #5 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station j 10309.62 14445.15 Planned: Plan #10 V2 MWD+IFR+MS MWD +IFR + Multi Station Casing Poi nts MD 'CVA Diameter Hole Size Name ft ft `' in . in ~~ 3458.55 2752.40 9 625 12.250 9 5/8" 10309.62 6657.40 7.000 8.750 7" 14445.15 6692.40 4.500 6.125 4112" Summary <--------- -------- Offset Wellpath ------------> Reference Offset- - Ctt•-Ctr -Nu-Go Allowable Site Well Wellpath MD MD Distance Area Deviation ft ft ft ft ft PB V Pad Plan V-04 (N-O) Plan V-04 V2 Plan: Pla 11900.00 2085.00 8591.21 75.67 8515.53 PB V Pad Plan V-121 (S-R) Plan V-121 V2 Plan: PI 10309.88 11695.00 1837.20 106.43 1730.77 PB V Pad Plan V-122 (S-U) Plan V-122PB1 V6 Plan: 10310.00 10310.00 0.00 0.66 -0.66 PB V Pad Plan V-205 (S-P) Plan V-205 V10 Plan: P 12000.00 8950.00 5063.69 94.59 4969.10 PB V Pad Plan V-205 (S-P) Plan V-205L1 OBa V5 PI 11575.08 10915.00 3560.06 113.12 3446.94 PB V Pad Plan V-205 (S-P) Plan V-205L2 OA V6 Pla 11577.39 10890.00 3591.33 112.21 3479.12 ', PB V Pad Plan V-217 (S-Q) Plan V-217 V2 Plan: PI 12000.00 5136.54 6020.03 80.40 5939.63 PB V Pad V-01 V-01 V15 13135.89 7025.00 7873.32 135.92 7737.40 PB V Pad V-02 V-02 V12 11950.00 6455.00 6940.15 73.59 6866.56 PB V Pad V-03 V-03 V7 10309.73 10780.00 3864.25 105.23 3759.02 PB V Pad V-100 V-100 V7 11982.96 8405.00 3644.61 102.61 3542.01 PB V Pad V-101 V-101 V7 11900.00 2225.00 8640.48 73.47 8567.00 PB V Pad V-102 V-102 V5 11900.00 1875.00 8499.87 74.38 8425.49 ', PB V Pad V-103 V-103 V6 11900.00 2020.00 8059.32 74.01 7985.31 ', PB V Pad V-104 V-104 V13 11900.00 2230.00 8526.85 75.05 8451.80 PB V Pad V-105 V-105 V13 11900.00 2795.00 7726.50 76.19 7650.31 PB V Pad V-106 V-106 V10 11900.00 2240.00 7962.18 74.92 7887.26 ', PB V Pad V-106 V-106A V9 11900.00 2015.00 8176.89 73.84 8103.05 i PB V Pad V-106 V-106AP61 V6 11900.00 2015.00 8176.89 73.84 8103.05 ', PB V Pad V-106 V-106AP62 V2 11900.00 2015.00 8176.89 73.84 8103.05 PB V Pad I V-106 V-106AP63 V2 11900.00 2015.00 8176.89 73.84 8103.05 I PB V Pad V-107 V-107 V5 11900.00 3700.00 7940.86 77.59 7863.27 PB V Pad V-108 V-108 V7 11925.81 1875.00 8920.12 71.20 8848.92 PB V Pad V-109 V-109 V2 11982.96 6260.00 5135.08 78.40 5056.68 PB V Pad V-109 V-109PB1 VS 11982.96 6260.00 5135.08 78.40 5056.68 PB V Pad V-109 V-109P62 V2 11982.96 6260.00 5135.08 78.40 5056.68 PB V Pad V-111 V-111 V25 11859.26 6770.00 6048.68 86.85 5961.83 ', PB V Pad V-111 V-111 PB1 V8 11859.26 6365.00 6636.37 85.19 6551.17 ', PB V Pad V-111 V-111 P62 V2 11859.26 6365.00 6647.46 84.45 6563.01 ', PB V Pad V-111 V-111 P63 V6 11859.26 6770.00 6048.68 86.85 5961.83 PB V Pad V-112 V-112 V7 11900.00 3635.00 8566.23 79.48 8486.75 PB V Pad V-113 V-113 V6 11927.09 2080.00 8738.80 71.78 8667.02 PB V Pad V-114 V-114 V5 12000.00 3225.00 8732.52 74.34 8658.18 PB V Pad V-114 V-114A V4 13310.31 11444.00 4765.77 140.86 4624.90 i PB V Pad V-114 V-114AP61 V4 12712.57 8544.00 7606.14 125.90 7480.24 PB V Pad V-114 V-114AP62 V2 13134.52 10677.00 5492.44 135.90 5356.55 PB V Pad V-115 V-115 V5 14396.58 9970.00 3192.19 215.18 2977.01 PB V Pad V-115 V-115PB1 V4 13321.43 8440.50 3694.72 161.47 3533.25 PB V Pad V-117 V-117 V9 14397.64 7680.00 4471.19 202.28 4268.91 ~~, PB V Pad V-117 V-117PB1 V6 14397.64 7680.00 4471.19 202.28 4268.91 VV'8rndg Pass: Major Risk Pass: Major Risk FAIL: NOERRORS Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk ', Pass: Major Risk Pass: Major Risk Pass: Major Risk ', Pass: Major Risk ', Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk ~, Pass: Major Risk Pass: Major Risk Pass: Major Risk C BP Alaska Anticollision Report Company: BP Amoco Date: 10/25/2006 Time: 12:37:14 Page: 2 j Field: Prudhoe Bay RefcrenceSite: PB V Pad Co-nrdinate(NN:) Reference: Well: Plan V-122 (S- U), True North ~~ Reference Well: Plan V-122 (S-U) Vertical ('fVD) Reference: V-122 P lan S-U 82.4 '' Reference ~~'ellpat h: Plan V-122 Db: Oracle Summary - - <----------- - O1"Fset~Vellpath -------------> - Reference Offset Ctr-Ctr No-Go Allowahle ~~ Site Well '- Wellpath NlD MD Distance :area Deviation Warning ft ft ft ft ft ~i PB V Pad V-117 V-117PB2 V6 14397.64 7680.00 4471.19 202.28 4268.91 Pass: Major Risk PB V Pad V-119 V-119 V13 13337.36 6220.00 7866.69 187.44 7679.25 Pass: Major Risk PB V Pad V-120 V-120 V5 11900.00 1820.00 8033.86 72.61 7961.25 Pass: Major Risk PB V Pad V-201 V-201 V8 11900.00 2250.00 8577.54 75.94 8501.60 Pass: Major Risk PB V Pad V-202 V-202 V9 11900.00 2815.00 7982.66 74.56 7908.10 Pass: Major Risk PB V Pad V-202 V-202L1 VS 11900.00 2815.00 7982.66 74.54 7908.12 Pass: Major Risk PB V Pad V-202 V-202L2 V5 11900.00 2815.00 7982.66 74.54 7908.12 Pass: Major Risk PB V Pad V-203 V-203 V18 11900.00 2085.00 8782.98 74.64 8708.34 Pass: Major Risk PB V Pad V-203 V-203L1 V6 11900.00 2085.00 8782.98 74.64 8708.34 Pass: Major Risk L PB V Pad V-203 V-203L2 V4 11900.00 2085.00 8782.98 74.64 8708.34 Pass: Major Risk PB V Pad V-203 V-203L3 V3 11900.00 2085.00 8782.98 74.64 8708.34 Pass: Major Risk '~ PB V Pad V-203 V-203L4 V3 11900.00 2085.00 8782.98 74.64 8708.34 Pass: Major Risk PB V Pad V-204 V-204 V2 11859.26 5715.00 6427.59 85.15 6342.44 Pass: Major Risk PB V Pad V-204 V-204L1 V2 11859.26 5985.00 6193.31 84.87 6108.44 Pass: Major Risk P8 V Pad V-204 V-204L1 PB1 V6 11859.26 5985.00 6193.31 84.87 6108.44 Pass: Major Risk PB V Pad V-204 V-204L2 V2 11878.76 5415.00 6738.08 83.22 6654.86 Pass: Major Risk ', PB V Pad V-204 V-204L2PB1 V5 11878.76 5415.00 6738.08 83.22 6654.86 Pass: Major Risk ', PB V Pad V-204 V-204L3 V3 11859.26 5660.00 6512.34 83.72 6428.62 Pass: Major Risk PB V Pad V-204 V-204P81 V9 11859.26 5715.00 6427.59 85.15 6342.44 Pass: Major Risk ', PB V Pad V-204 V-204PB2 V2 11859.26 5715.00 6427.59 85.15 6342.44 Pass: Major Risk PB V Pad V-210 V-210 V9 11900.00 1635.00 8665.27 72.93 8592.34 Pass: Major Risk PB V Pad V-211 V-211 V5 11900.00 1730.00 8869.74 75.00 8794.74 Pass: Major Risk PB V Pad V-212 V-212 V7 11859.26 3840.00 6165.58 79.89 6085.69 Pass: Major Risk PB V Pad V-213 V-213 V5 11900.00 2535.00 7475.71 76.04 7399.67 Pass: Major Risk ', PB V Pad V-213 V-213P61 VS 11900.00 2535.00 7475.71 76.04 7399.67 Pass: Major Risk ', PB V Pad V-214 Plan V-214 V1 Plan: PI 11900.00 1780.00 8552.43 73.60 8478.83 Pass: Major Risk PB V Pad V-214 V-214PB1 V2 11950.00 1006.00 8984.73 67.84 8916.89 Pass: Major Risk ~! PB V Pad V-214 V-214P62 V3 11900.00 1775.00 8553.41 73.63 8479.78 Pass: Major Risk PB V Pad V-214 V-214PB3 V5 11900.00 1775.00 8553.41 73.63 8479.78 Pass: Major Risk PB V Pad V-214 V-214PB4 V2 11900.00 1775.00 8553.41 73.62 8479.78 Pass: Major Risk PB V Pad V-216 V-216 V8 11900.00 1655.00 8327.00 72.13 8254.87 Pass: Major Risk PB V Pad V-221 V-221 V6 11900.00 1805.00 8271.48 74.26 8197.22 Pass: Major Risk • FieldPrudhoe Bay SitePB V Pad We11:Plan V-122 (S-U) WellpathElan V-122 -9 4 90 60 30 0 2 30 60 90 -9 4 n 0 ~ Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY BOREALIS OIL - 640130 _ _ _ _ Well Name: PRUDHOE BAY UtJ BORE V-122 _ _ Program DEV_____ ______ Well bore seg ~ PTD#:2061470 Company BP EXPLORAT_I.ON~ALASKA~ 1NC _____ __ _ _ .Initial ClasslType ___DEVL1-O1L_ _GeoArea 690 ____ _ Unit 11651)__ __ _ On/Off Shore On Annular Disposal [ J Administration 1 Permit_fee attached- No This is a change of directional plan 2 Lease number appropriat_e_ Yes submitted before the well was spud.. The new 3 Unique well_name and number Yes well design. conforms. to all atliministrative 4 Well located in a definedpool Yes and geological review-RPC 1Dl31/2006 ',5 Well_located proper distance_from drilling unit boundary_ Yes 16 Well located proper distance from other wells Yes ~~7 Sufficient acreage available in drilling unit Yes !8 If deviated, is_wellbore plat_included Yes 9 Operator only affected party _ _ Yes !11 D Operator has_appropriate bond in force Yes 111 Permit can be issued without conservation order _ _ Yes '12 Permit can be issued without administrative_approval Yes A r Date 1113 pp Can permit be approved before 15-day wait, Yes RPC 10!3112006 114 Well located within area an_d strata authorized by_Injection Order # (put 10# in comments)-(For NA_ 15 All wells within 1l4_mile area of review identified (For service wel_I only) tJA X 16 Pre-produced injector; duration ofpre-production Less than_ 3 months (For service well, only) NA 17 Nonconven. gas conforms to AS31.D5,030(i.1.A),(j.2_.A-D) _ _ _ _ NA_ 18 Conductor string_provided Yes 20" @ 110'. Engineering 19 nown S s urface casing_protectso e i 20 CMT V01 atleguate to circulate on conductor & surf_csg Yes Adequate excess j 21 CMT_vOt adequate to tie-in long string to surf csg_ - - - No X 22 CMT_will cover all knownproductive horizons_ _ _ _ _ . Yes 23 Casing designs adequate for C, T, B &_permafr_osi_ Yes --- 1, 24 Adequate tankage or reserve pit Yes Nabors_9ES. x', 25 If a_re-drill., has_a_ 10-403 for abandonment been approved NA New well.. 26 Adequate wellbore separation_proposed _ _ _ _ _ Yes ! 27 If diverter required, does it meet regulations- _ Yes X 28 Dril_lingf1uid-program schematic & equip list adequate Yes Max MW 10,9_ppg. Appr Date 29 BOPEs, do they meet_ regulation _ _ _ _ _ _ _ Yes _ , ~ 30 ROPE-press rating appropriate; test to (put prig in comments)_ Yes Tesi to 3500 psi. MSP 2738 psi. ~31 Choke_manifold complies w/APt RP-53_ (May 84)_ _ _ Yes _ _ 32 Work will occur without operation shutdown _ _ _ _ _ _ _ Yes _ 33 Is presence_of H2$ gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ No _ _ _ IJot an H2S pad__. 34 Mechanical condition of wells within AOR verified (Fo(service well only) NA_ 35 Permitcan be issued w/o hydrogen sulfide measures _ No_ __ __ __ _- Geology '136 Data presented on potential overpressure zones_ _ _ __ _ _ tUA__ _ 37 Seismic analysis of shallow gas_zones_ _ _ _ _ _ _ _ NA_ _ _ Appr Date 38 Seabed condition survey (if off_-shore) ---- NA RPC 10!31/2006 39 Contact namelphone for weekly progress reports [exploratory only] NA_ Y s DW IJ S ll k Geologic Engineering Public Date: Date Date Commissioner. Coin ' sinner: // a Commissioner r a • Robert Tirpack Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 FRANK H. MURKOWSKI, GOVERNOR 333 W. 7T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-122 BP Exploration (Alaska) Inc. Permit No: 206-147 Surface Location: 4711' FSL, 1546' FEL, SEC. 11, T11N, R11E, UM Bottomhole Location: 2188' FSL, 4304' FWL, SEC. O 1, T 11 N, R 11 E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. In accordance with 20 AAC 25.005(fl, all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (PBU V-122 PH) and API number (50- 029-23328-70) from records, data and logs acquired for well PBU V-122 /API number 50-029-23328. This permit to drill does not exempt you from obtaining additional permits or an approval required by Iaw from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission spec~cally authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this day of October, 2006 Sincerely, Cathy P. Foerster Commissioner cc: Department of Fish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~1bCG~ jy~f~.do 4 STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMIS`!UN PERMIT TO DRILL 20 AAC 25.005 ~ (: T 12 2006 '~iasia ~-'i' Gas Cons. Commission h~'i~i90ta(~p 1 a. Type of work ® Drill ^Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU V-122 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11529 TVD 6644 12. Field /Pool(s): Prudhoe Bay Field /Borealis 4a. Location of Well (Governmental Section): Surface: 4711' FSL 1546' FEL SEC 11 T11 N R11 E UM (As Planned) 7. Property Designation: ADL 028240 Pool , , , , . , Top of Productive Horizon: 990' FSL, 4878' FWL, SEC. 01, T11 N, R11 E, UM 8. Land Use Permit: 13. Approximate Spud Date: November 15, 2006 Total Depth: 2188' FSL, 4304' FWL, SEC. 01, T11N, R11E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 16,700' 4b. Location of Well (State Base Plane Coordinates): Surface: x-" 590756 y-' 5969961 Zone-ASP4 10. KB Elevation Plan (Height above GL): 83.7 feet 15. Distance to Nearest Well Within Pool: 455' 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole An le: 111 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3413 Surface: 2738 18. Casin >Pr ram: S cificatio ns Ta - Se in De -Bo ttom unit of C merit c.f. or sacks. Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 42" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set A rox. 12-1/4" 9-5/8" 40# L-80 BTC 3548' Surface Surface 3548' 2754' 575 sx Arcticset Lite 207 sx'G' - /4" 7" 26# L-80 TC-II 4 Surfa urf ce 4550' 3317' See B low 8-3/4" 7" 26# L-80 BTC-M 5875' 4550' 3317' 10425' 6806' 424 sx LiteCrete 143 sx Class'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 1510' 10018' 6558' 11528' 6644' 205 sx Class 'G' 19. PRESE NTWELL CONDITION SUMMARY (To'be completed for. Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing' Length Size Cement Volume MD: TVD Conductor /Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Robert Tirpack Si nature' ~~~~'~-~ Contact Scott Kolstad, 564-5347 Title Senior Drilling Engineer Prepared By Name/Number: Phone 564-4166 Date ~~~~~~ Terrie Hubble, 564-4628 - Commission Use Onl Permit To Drill Number:.~4 API Number. 50- (j 2. - 3 ~3~ ~ Permit Approval See cover letter for Date: other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: L t2 Samples Req'd: ^ Yes ~ No Mud Log Req'd: ^ Yes ~ No l Q S l `~ t~ ~~ C '~O ~ s~ O ~/> 1 4 HZS Measures: Yes ^ No Directional Survey Req'd: ~ Yes ^ No D~~c v~s k a~.~- -~d 7.a ~~4-~ zs. 0 3 ~ C~~ ~> ~ ~ a,l ~ e,,,rtt~..,~ ~. [3 0 C: -f -E~ t ~0 Y~ c.P. c~u ~ >' ~ c~YJ t-~ U e ~ . APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-401~2evised 12/2005 ~~ Submit In Duplicate • Well Name: V-122 Drill and Complete Plan :Summary T e of Well service / roducer / in'ector : Producer Surface Location: X=590755.9 Y=5969960.5 As-Staked 569' FNL, 1546.5' FEL ,Sec. 11, T11 N, R11 E Target Locations: X=597,160 Y=5,971,600 To Kur aruk: 990.4' FSL, 401.1' FEL ,Sec. 1, T11 N, R11 E Bottom Hole Location: X =596,570 Y = 5,972,790 2187.8' FSL, 975.6' FEL ,Sec. 1, T11 N, R11 E Ri Nabors 9ES Estimated Start Date: 11/15/2006 O eratin da s to com lete: 24 MD: 11,529' TVD: 6644' RT/GL: 28.5' RKB: 83.7' Well Desi n conventional, slimhole, etc.: Ultra Slimhole Horizontal Ob'ective: Producer in the Kuparuk River C Sand Directional: Ver. Anadrill P3 KOP: 300' Maximum Hole An le: 111.0 deg at 10,447' MD Close Approach Wells: All wells pass major risk criteria. The nearest well is: V-100 - 15.6' ctr-ctr C«3 455' None IFR-MS corrected surve s will be used for sunre validation. Distance to Nearest Property 16,700' to PBU boundary Line• Logging Program: Surface Drilling: MWD / GR Open Hole: None Cased Hole: None Intermediate Hole Drilling: MWD/GR/RES/PWD/DEN/NEU Open Hole: None Cased Hole• Production Hole Drilling: MWD/GR/RES/DEN/NEU Open Hole: None Cased Hole• V-122 Permit application Page 1 • Mud Program: 12 ~/a" Surface Hole: Fresh Water Surface Hole Mud Density Viscosity seconds Yield Point Ib/1-~ API FL mis/30min PH Initial 8.5 - 9.2 250-300 50 - 70 15 - 20 8.5 - 9.5 Base PF to to SV 9.0 - 9.5 250-300 30 - 45 < 10 8.5 - 9.5 SV toTD 9.5 max 250-300 20 - 40 < 10 8.5 - 9.5 8 3/a "Intermediate Hole: LSND Interval Density Tau o YP PV pH API 10' Gel (ppg) Fiiltrate Upper 9.2 4-7 25-30 10-15 8.5-9.5 6-10 10 Interval Top of HRZ 10.9 3-7 20-25 10-15 8.5-9.5 4-6 10 to TD ~__ 6 1/8" Production Hole: FloProNT Interval Density YP PV LSRV HTHP FL pH Window to TD 9.5 20 - 24 10 - 20 20 - 30K 4-6 9 Casin Rubin Pro ram: Hole Size Csg/ Tb O.D. Wt/Ft Grade Conn Length Top MDlTVD Btm MDlTVD bkb 42" Insulated 20" 91.5# H-40 WLD 80' GL 110'/110' 12 1/a" 9 5/8" 40# L-80 BTC 3548' GL 3548' / 2754' 8 3/a" 7" 26# L-80 TC-II 4550' GL 4550' / 3317' 8 3/a" 7" 26# L-80 BTC-m 5875' 4550' / 3317' 10425' / 6806' 6 1 /8" 4 '/z" 12.6# L-80 I BT-M 1510' 10018'/6558' 11528' / 6644' Tubing 3 ~/z" 9.3# 13 Cr IBT-M 6618' 3400'/ 2600' 10018' / 6558' Tubin 4 ~/z" 12.6# 13 Cr Vam To 3400' GL 3400 / 2222' Integrity Testing: Test Point Depth Test Type EMW Surface Casing Shoe 20' - 50' from surface shoe LOT Expected >12.5 Intermediate Casing Shoe 20' - 50' from intermediate FIT 11.5 ppg shoe V-122 Permit application Page 2 r • Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as a contin enc if cement is not circulated to surface. Casing Size 9-5/8" Surface String Basis: Lead: Based on conductor set at 110', 1900' of annulus in the permafrost C~ 250% excess and 1148' of open hole from top of tail slurry to base permafrost C«~ 30% excess. Lead TOC: To surface Tail: Based on 500' MD above the casing shoe + 30% excess + 80' shoe track volume. Tail TOC: At 3048' MD Total Cement Volume: Lead 454 bbl / 2551 ft 75~ , s of Schlumberger Arctic SET Lite 10.7 an~~~k4. ~#/sk. Tail 42 bbl / 238 ft,,/- 07;`sks of Schlumberger Neat "G" at 15.8 aoa and 1:17 cf/sk. Intermediate Casin Casin Size 7" Intermediate Basis: Lead: Based on 5120' of open hole with 30% excess. Lead TOC: At 4548' MD (3232' TVDss, 749' TVDss above the top of the Ma). Tail: Based on 80' shoe track volume and 757' of open hole (to 500' MD above top Kuparuk formation) with 30% excess. Tail TOC: At 9,668' MD __ _„ Total Cement Volume: Lead y7~1~1 / 1000 ft / 424 sks' of Dowell LiteCrete at 11.5 ppg at "2.36 f/sk - Tail bl / 165.#t /,143 s_ks of Dowell Premium `G' w/ latex at 15.8 ooa and 1.16 ci`/sk:~" Production Liner: Casino Size 4 ~/z" liner Basis: Based on fully cemented liner + 50% excess, 80' shoe track volume, and 200' DP x Casin annulus. Total Cement Volume: Tail 43 bbl / 240 ft / 205 sks of Schlumberger class "G" at 15.8 apq and 1.i7 cfTsk with latex. V-122 Permit application Page 3 • ~ (7) Formation Tops(TVDss) and Estimated Pore Pressures Est. Format ion To s ncertain Commerc ial Hydroca rbon Bearin Est. Pore Press. st. Pore Press. Formalzon (T[~Dss ) (eet) (Yes/No) (Psi) ( EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells Gl 245 +/- 30' no 111 8.8 SV6 890 +/- 30' no 405 8.8 EOCU 1465 +/- 30' no 667 8.8 SVS 1571 +/- 30' no 715 8.8 BPRF 1690 +/- 30' no 769 8.8 SV4 1700 +/- 30' 774 8.8 ault #1 070 +/- 100' M.D. -see fault section for details. 42 .8 SV3 (faulted to) 2070 +/- 30' 942 8.8 SV2 2190 +/- 50' 996 8.8 SVl 2525 +/- 50' 1149 8.8 UG4 2820 +/- 50' 1283 8.8 UG4A 2855 +/- 50' 1299 8.8 UG3 3230 +/- 50' 1400 8.8 UGl 3775 +/- 50' 1718 8.8 UG_MA 4045 +/- 50' no 1820 8.7 UG_MB1 4100 +/- 50' no 1845 8.7 UG_MB2 4160 +/- 50' es 1872 8.7 SB_Na 4290 +/- 50' no 1909 8.6 SB_OA 4455 +/- 50' es 1920 8.6 SB_OBA 4515 +/- 50' es 1982 8.6 SB_OBd 4670 +/- 50' es 2009 8.6 SB_OBf base 4820 +/- 50' no 2078 8.6 ault #2 (intra Colville 900 +/- 100' M.D. -see fault section for details. 145 .6 CM2 5160 +/- 100' no CM1 5885 +/- 50' no Fault #3 6200 +/- 150' M.D. -see fault V-122 Permit application Page 4 • section for details. THRZ 6345 +/- 50' no Kalubik 6500 +/- 50' no K-1 6530 +/- 50' no TKC4 6575 +/- 50' es 3100 9.1 TKB/LCU 6665 +/- 50' no 3413 9.8 TKB3 6695 +/- 50' no 3422 9.8 TD 6704 TKB2 6715 +/- 50' no 3429 9.8 TKB1 6740 +/- 50' no 3436 9.8 TKA6 6770 +/- 50' no 3446 9.8 TKAS 6780 +/- 50' no 3449 9.8 OWC 6655 FWL 6680 Well TD Criteria (ie ??ft TVD, ??ft Rathole, etc.) Comments Pilot hole: 100' MD below TKB/LCU, MWD. Horizontal section: Drill according to well plan to TD - do not exceed hardline 2 at north end of target polygon. PBTD 85' MD from TD. TKB & TKA6 pore pressures estimated from V-100 MDT Well Control: Surface hole will be drilled with diverter. The intermediate and production hole well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOP equipment will be tested to 3500 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. V-122 Permit application Page 5 w • Intermediate Interval- s Maximum anticipated BHP: 3413 psi C~ 6749' TVD -Kuparuk River B • Maximum surface pressure: 2738 psi C~ surface ~ (based on BHP and a full column of gas from TD (~ 0.10 psi/ft) Production Interval- • Maximum anticipated BHP: 3100 psi @ 6659' TVD -Kuparuk River C Sand • Maximum surface pressure: 2434 psi C~ surface (based on BHP and a full column of gas from TD C~ 0.10 psi/ft) • Planned BOP test pressure: 250 / 3500 psi • Planned completion fluid: 9.5 ppg brine / 6.8 ppg diesel (2,200' TVD) Kick Tolerance / Inte ri Testi Summa Table Casing / Casing Test Maximum Mud Exp Pore LOT / Interval Pressure Influx Weight Press FIT Volume Surface Casing / 3500 psi 77 (based on 10.9 9.8 LOT 8-3/a" hole 12.5 LOT Ku aruk B Intermediate 3500 psi Infinite 9.5 9.1 11.5 Casing / 6-1/8" (Kuparuk C) (FIT) hole Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for disposal. Haul all Class I wastes to Pad 3 for disposal. V-122 Permit application Page 6 + • DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" insulated conductor is installed. 1. Weld an FMC landing ring for the FMC Ultra slimhole wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Rig Operations: 1. MIRU Nabors 9ES. ~ 2. Nipple up and function test diverter. PU 4" DP as required and stand back in derrick. 3. MU 12'/a" drilling assembly with MWD/GR/Dir and drill surface hole to approximately 200' TVD below the SV1 Sand top. 4. Run and cement the 9-5/8", 40# surface casing tto surface./ 5. ND diverter and NU casing /tubing head. NU BOPE and test. 6. MU 8-3/4" drilling assembly with MWD/GR/DIR/RES/PWD and RIH to float collar. Test the 9-5/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to LSND drilling fluid. Drill 20' - 50' of new formation and perform Leak Off Test. 8. Drill to +/-100' above the HRZ, ensure mud is in condition and up to required weight and perform short trips as needed. Ensure Pre-Reservoir meeting is held high lighting kick tolerance and detection prior to entering the Kuparuk. 9. Drill ahead to TD in the Kuparuk. 10. Condition hole for running 7" 26# intermediate casing. 11. Run and cement the 7" intermediate casing. ~ 12. PU whipstock and window mills. RIH and set Whipstock. 13. Test the 7" casing to 3500 psi for 30 minutes. 14. Displace well to FloPro and mill window. 15. MU 6-1/8" build drilling assembly. ~ 16. Drill 20' - 50' of new formation and perform Formation Integrity Test. Drill the build section of 22.5°/100' DLS. 17. MU 6-1/8" drilling assembly with MWD/GR/DIR/RES/DEN/NEU. 18. Drill horizontally to TD with the assistance of the on-site Geologist. 19. Run 4'h", L-80, liner with liner hanger and packer. 20. Cement liner in place. ~ 21. DPC perforate 1000'. 22. Freeze protect the 7" x 9-5/8" annulus as required. Record formation breakdown pressure on the `~ Morning Report. 23. Run the 3 %2" x 4'/z" 13Cr gas lift completion. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear the GLM shear valve and install TWC. Test below to 1000 psi. 24. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Remove TWA: 25. RU hot oil truck and freeze protect well to 2,200' TVD with diesel. .j 26. Rig down and move off. Post-Rig Work• 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull shear valve, install GLV in all of the other mandrels as per the PE. V-122 Permit application Page 7 • Max. Recorded H2S on Pad/Facilit V-117 180 Dec-OS VII. Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Est. Throw Throw .Direction Uncertain Fault #1 - SV3 2479 -2070 -60' West +/- 100' MD Fault #2 -Colville 7520 -4900 +100' East +/- 100' MD i-aul~ #.5 - i_tn~~~~ ~'~,, 7 J5~4 -6200 60' West I ~/- 100' MD CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION V-122 Permit application Page 9 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control /Reservoir Pressures: Interval Psi (EMW) TVDss Schrader, OA 1982 (8.6) 4,455 Ku aruk C sand 3,100 (9.1) 6,575 II. Hydrates and Shallow gas: A. Gas Hydrates are expected at V-Pad near the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation /Breathing: A. Lost circulation risk is considered low within the horizontal section and low to moderate throughout the uphole intervals. IV. Kick Tolerance /Integrity Testing: A. The 9 6/8' casing will be cemented to surface. The 7" casing will be cemented to 1000' MD from the surface casing shoe. Kick Tolerance ! Int rit Testin Summa Table Casing / Casing Test Maximum Mud Exp Pore LOT / Interval Pressure Influx Weight Press FIT Volume Surface Casing 3500 psi 77 (based on 10.9 9.8 LOT / 8-3/a" hole 12.5 LOT Ku aruk B Intermediate 3500 psi Infinite 9.5 9.1 11.5 Casing / 6-1/8" (Kuparuk C) (FIT) hole NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string V-Pad development wells may have "kick tolerances" in the 25 bbl range. A heightened awareness of kick detection, pre-job planning and trip tank calibration will be essential while drilling/tripping the intermediate/ roduction intervals. V. Stuck Pipe A. There could be differential sticking across the Schrader Bluff while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide i A. V-Pad is n`ot ~ignated as an HZS site, however Standard Operating Procedures for HZS precautions should bellowed at all times. No measurable HZS is being produced from the formation at this time. However 10 ppm is measured regularly at V-Pad as a result of the use of Ivishak gas lift gas. All V-Pad gas lift wells will likely have HZS in this concentration. Note that all injection has been with produced water not seawater. HZS levels are expected to remain low until the water flood matures. HaSSumma Table Welt Name HZS Level Date of Ideadiu #1 Closest SHL Well H2S Level V-117 20 Au -06 #2 Closest SHL Well H2S Level V-100 10 est #1 Closest BHL Well H2S Level V-106A 110 Jul-06 #2 Closest BHL Well H2S Level V-111 10 Au -06 V-122 Permit application Page 8 TREE= 4-1/18" WELLHEAD = FMC ACTUATOR = LEO KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TV D = V ~ 1 ~Z ro o s e d SA~ NOTES: """CHROME TBG"** ° @ ' p p 20" CONDUCTOR 9-5/8" CSG, 40#, L-80 BTC, ID = 8.835" F- j 3548' ~-- 4-1/2" TBG, 12.6#, 13Cr-80, VamTop .0152 bpf, ID = 3.9 " 3-1/2" TBG, 9.2#, 13CR-80, .0087 bpf, ID = 2.992" 7" CSG, 26#, L-80 TCII, .0383 bpf, ID = 6.276" ~~ 504$' Minimum ID = 2.813" @ 9044' 3-1 /2" XD DURO SLIDING SLEEVE MILLED WINDOW (7") 7" BKR WHIPSTOCK 10168' 7" HES EZSV 7" CSG, 26#, L-80 BTC, .0383 bpf, ID = 6.276" 10425' PERFORATION SUMMARY REF LOG: LWD ON ANGLE AT TOP PERF: @ ' Note: Refer to PI'oduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 2-1/2" 6 O 9-5/8" TAM PORT COLLAR -~ 2600' H4-1/2" HES X NIP, ID = 3.813" -3400' 4-1/2" X 3-1/2" XO, ID = 2.992" GAS LIFE MANDRELS 3T MD TVD DEV TYPE VLV LATCH PORT DAl 6 2600 MMG DMY 5 3400 MMG shear 4 4100 MMG DMY 3 4800 MMG DMY 2 5500 MMG DMY 1 tbd MMG DMY 982$' 3-1/2" XD DURO SLIDING SLV, ID = 2.813" 9848' ~~ 3-1/2" HES X NIP, ID = 2.813" 9868' 3-1/2" HES SYMPHONY GAUGE CARRIER 9918' 7" X 3-1 /2" BKR PremierPKR, ID = " 9938' --~3-1/2" HES X NIP, ID = 2.813" 9958' 3-1/2" HES X NIP, ID = 2.813" 10018' 7" X 5" BKR ZXP PKR &LNR HGR w /TIEBACK SLV, ID = 4.410" 10024' 4-1/2" WLEG, ID = 4.000" 10028' 5" X 4-1/2" XO, ID = 3.920" ~ :,. 6 ` "r ~-° 10621' "MARKER JT W/ RA TAG t -~ 10850' "MARKER JT W/ RA TAG 11075' -{ MARKER JT ~ I W/ RA TAG PBTD - j 11450' ~- 4-1/2" LNR, 12.6 #, L-80 IBT-M, ID = 3.958" 11529' DATE REV BY COMMENTS DATE REV BY COMMENTS Borealis Unit 10/05/06 SRK Proposed Completion WELL: V-122 PERMff No: API No: 50-029- SEC 11, T11 N, R11 E, 569' SNL & 1546' WEL BP Exploration (Alaska) ~ ~ Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance #o the provisions of 20 AAC 25.035 (e)(10)C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, except-when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadvertently closed on a tool joint during routine operations.) The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after it has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact regulation language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next wellbore entry, to the required working pressure specified in the approved Permit to Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e}(10}C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 {d)(4} THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e}(1) WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the regulation is intended to apply to ram type equipment only. The AOGCC understands that ram #ype BOP's are utilized for purposes other than well control in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036(fj THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h} TUBING WORKOVERS; 20 AAC 25.286(g) WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the ROPE requirements in (e) of this section if the variance provides at least an equally effective means of well control; ~~ Schlumberger V-122PB1 (P3) Proposal Report Date: September 21, 2006 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 74.520° Field: Prudhoe Bay Unit - WOA ~ Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: V-Pad /Plan V-3a06 (S-U) ~~~' ~~ s u y TVD Reference Datum: Rotary Table Well: Plan V-122 (S-U) ~ TVD Reference Elevation: 83.70 ft relative to MSL Borehole: Plan V-122PB1 ~e~ Sea Bed 1 Ground Level Elevation: 55.20 ft relative to MSL UWIIAPI#: 50029 Magnetic Declination: 23.949° Survey Name 1 Date: V-122PB1 (P3) /September 21, 2006 Total Field Strength: 57625.063 nT Tort f AHD 1 DDI 1 ERD ratio: 136.568° / 7341.38 ft / 6.186 / 1.07E Magnetic Dip: 80.878° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: September 21, 2006 Location LaULong: N 70.32766121, W 149.26397315 Magnetic Declination Model: BGGM 2006 Location Grid WE YIX: N 5969960.500 ftUS, E 590755.900 ftUS North Reference: True North Grid Convergence Angle: +0.69307163° Total Corr Mag North •> True North: +23.949° Grid Style Factor: 0.99990936 Local Coordinates Referenced To: Well Head • Measured Vertical Grewty Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft d de 1100 ft d 100 ft de 100 ft ftUS ftUS rcie u.w u.uu sou.uu -a3./U U.UU U.UU U.UU U.UU --- U.UU U.UU U.UU 596996U.5U 59U/55.9U N /U.32/ti6121 W 149.26397315 KOP Bld 1.5/100 300.00 0.00 350.00 216.30 300.00 0.00 0.00 0.00 HS 0.00 0.00 0.00 5969960.50 590755.90 N 70.32766121 W 149.26397315 400.00 1.50 350.00 316.29 399.99 0.12 1.29 -0.23 HS 1.50 1.50 0.00 5969961.78 590755.66 N 70.32766472 W 149.26397499 500.00 2.99 350.00 416.21 499.91 0.50 5.14 -0.91 HS 1.50 1.50 0.00 5969965.63 590754.93 N 70.32767526 W 149.26398050 600.00 4.49 350.00 515.99 599.69 1.12 11.57 -2.04 HS 1.50 1.50 0.00 5969972.05 590753.72 N 70.32769282 W 149.26398969 Crv 3.5/100 634.00 5.00 350.00 549.88 633.58 1.39 14.34 -2.53 1O5.OOR 1.50 1.50 0.00 5969974.81 590753.20 N 70.32770039 W 149.26399366 700.00 4.93 16.91 615.64 699.34 3.19 19.89 -2.20 78.18R 3.50 -0.10 40.78 5969980.36 590753.46 N 70.32771555 W 149.26399101 800.00 6.61 48.21 715.15 798.85 10.65 27.84 3.34 47.O4R 3.50 1.67 31.29 5969988.38 590758.90 N 70.32773727 W 149.26394607 900.00 9.35 64.17 814.19 897.89 23.80 35.22 14.94 31.22R 3.50 2.74 15.97 5969995.89 590770.41 N 70.32775741 W 149.26385199 1000.00 12.47 72.60 912.37 996.07 42.58 41.98 32.56 22.94R 3.50 3.12 8.43 5970002.87 590787.95 N 70.32777590 W 149.26370912 1100.00 15.75 77.63 1009.34 1093.04 66.94 48.12 56.13 18.O6R 3.50 3.28 5.03 5970009.30 590811.44 N 70.32779268 W 149.26 ' 98 1200.00 19.11 80.94 1104.74 1188.44 96.77 53.61 85.57 14.9OR 3.50 3.36 3.31 5970015.14 590840.80 , N 70.32780767 W 149.2 9 1300.00 22.51 83.29 1198.20 1281.90 131.97 58.43 120.75 12.7OR 3.50 3.40 2.35 5970020.38 590875.93 6 N 70.32782082 W 149.2 5 1400.00 25.94 85.05 1289.39 1373.09 172.40 62.55 161.56 11.1OR 3.50 3.43 1.76 5970024.99 590916.68 N 70.32783208 W 149.26266301 1500.00 29.38 86.42 1377.95 1461.65 217.91 65.97 207.85 9.88R 3.50 3.44 1.37 5970028.97 590962.91 N 70.32784142 W 149.26228772 1600.00 32.83 87.53 1463.56 1547.26 268.34 68.67 259.43 8.93R 3.50 3.45 1.11 5970032.29 591014.45 N 70.32784879 W 149.26186946 1700.00 36.29 88.45 1545.90 1629.60 323.50 70.64 316.11 8.18R 3.50 3.46 0.92 5970034.95 591071.10 N 70.32785416 W 149.26140980 1800.00 39.76 89.23 1624.66 1708.36 383.17 71.87 377.69 7.568 3.50 3.47 0.78 5970036.93 591132.66 N 70.32785753 W 149.26091046 End Crv 1833.24 40.91 89.46 1650.00 1733.70 403.97 72.12 399.20 --- 3.50 3.47 0.70 5970037.43 591154.16 N 70.32785820 W 149.26073602 Crv 3.5/100 1899.40 40.91 89.46 1700.00 1783.70 445.83 72.53 442.53 16.73E 0.00 0.00 0.00 5970038.37 591197.48 N 70.32785930 W 149.26038466 1900.00 40.93 89.45 1700.45 1784.15 446.21 72.53 442.92 16.72E 3.50 3.35 -1.54 5970038.37 591197.87 N 70.32785931 W 149.26038149 2000.00 44.29 88.01 1774.04 1857.74 511.84 74.06 510.59 15.66E 3.50 3.36 -1.44 5970040.72 591265.51 N 70.32786348 W 149.25983272 2100.00 47.67 86.73 1843.52 1927.22 581.94 77.38 582.42 14.77E 3.50 3.38 -1.28 5970044.91 591337.28 N 70.32787253 W 149.25925030 WeIlDesign Ver SP 2.1 Bld(doc4Ox_1OO) Plan V-3aO6 (S-U)\Plan V-122 (S-U)\Plan V-122PB1\V-122PB1 (P3) Generated 9/21/2006 1:24 PM Page 1 of 2 Measured Vertical Gravity Comments Inclination Azimuth Sub•Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de de 1100 ft de 100 ft d 100 ft ftUS ftUS LLUU.UU 51.Uti aa.oy 1yUiS.b3 1yye.ss (ibti.lti t71.4tf libtf.l'L 14.U:iL :S.SU 3.39 -1.15 5y/UUSU.y:i by141L.y1 N /U.;i1/tftSEi4(i W 149.2b8ti3642 2300.00 54.46 84.54 1969.14 2052.84 734.52 89.35 737.42 13.40E 3.50 3.40 -1.04 5970058.75 591492.12 N 70.32790519 W 149.25799335 End Crv 2340.53 55.84 84.15 1992.29 2075.99 767.29 92.62 770.52 --- 3.50 3.41 -0.98 5970062.43 591525.17 N 70.32791414 W 149.25772497 SV3 2496.74 55.84 84.15 2080.00 2163.70 894.73 105.81 899.11 --- 0.00 0.00 0.00 5970077.16 591653.58 N70.32795011 W149.25668222 SV1 3369.44 55.84 84.15 2570.00 2653.70 1606.72 179.46 1617.50 --- 0.00 0.00 0.00 5970159.49 592370.96 N 70.32815100 W 149.25085661 9-5/8" Csg Pt 3547.54 55.84 84.15 2670.00 2753.70 1752.02 194.49 1764.11 -- 0.00 0.00 0.00 5970176.30 592517.36 N 70.32819197 W 149.24966769 OA 6575.29 55.84 84.15 4370.00 4453.70 4222.19 450.02 4256.49 --- 0.00 0.00 0.00 5970461.93 595006.24 N 70.32888733 W 149.22945542 Crv 4/100 8313.25 55.84 84.15 5345.82 5429.52 5640.09 596.70 5687.14 121.87E 0.00 0.00 0.00 5970625.89 596434.88 N 70.32928545 W 149.21785271 8400.00 54.06 80.51 5395.65 5479.35 5710.43 606.16 5757.51 119.78E 4.00 -2.05 -4.20 5970636.19 596505.12 N 70.32931114 W 149.21728202 8500.00 52.16 76.11 5455.69 5539.39 5790.19 622.32 5835.80 117.13E 4.00 -1.91 -4.40 5970653.30 596583.20 N 70.32935513 W 149.21664701 8600.00 50.42 71.49 5518.25 5601.95 5868.18 644.04 5910.70 114.24E 4.00 -1.74 -4.62 5970675.93 596657.83 N 70.32941432 W 149.2 8700.00 48.88 66.65 5583.01 5666.71 5944.00 671.22 5981.85 111.11 L 4.00 -1.54 -4.84 5970703.96 596728.64 1 N 70.32948841 W 149.21 8800.00 47.55 61.59 5649.67 5733.37 6017.30 703.72 6048.91 107.73E 4.00 -1.33 -5.06 5970737.27 596795.29 N 70.32957705 W 149.21491823 8900.00 46.45 56.33 5717.90 5801.60 6087.71 741.38 6111.54 104.14E 4.00 -1.10 -5.26 5970775.68 596857.46 N 70.32967980 W 149.21441007 9000.00 45.60 50.89 5787.36 5871.06 6154.89 784.03 6169.44 100.37E 4.00 -0.85 -5.43 5970819.01 596914.83 N 70.32979616 W 149.21394024 9100.00 45.01 45.33 5857.73 5941.43 6218.51 831.44 6222.32 96.45E 4.00 -0.59 -5.57 5970867.06 596967.14 N 70.32992558 W 149.21351101 9200.00 44.70 39.67 5928.64 6012.34 6278.27 883.40 6269.94 92.44E 4.00 -0.31 -5.66 5970919.58 597014.12 N 70.33006741 W 149.21312448 9300.00 44.67 33.98 5999.77 6083.47 6333.87 939.64 6312.06 88.40E 4.00 -0.03 -5.69 5970976.33 597055.55 N 70.33022096 W 149.21278254 9400.00 44.92 28.31 6070.75 6154.45 6385.04 999.90 6348.47 84.37E 4.00 0.25 -5.67 5971037.02 597091.22 N 70.33038550 W 149.21248684 9500.00 45.45 22.72 6141.26 6224.96 6431.54 1063.88 6378.99 80.43E 4.00 0.53 -5.59 5971101.35 597120.97 N 70.33056021 W 149.21223884 9600.00 46.25 17.26 6210.94 6294.64 6473.13 1131.26 6403.49 76.63E 4.00 0.80 -5.46 5971169.03 597144.64 N 70.33074425 W 149.21203974 9700.00 47.30 11.96 6279.45 6363.15 6509.61 1201.73 6421.83 73.00E 4.00 1.05 -5.30 5971239.70 597162.13 N 70.33093672 W 149.21189051 THRZ 9775.20 48.24 8.10 6330.00 6413.70 6533.57 1256.54 6431.51 70.40E 4.00 1.26 -5.13 5971294.62 597171.15 N 70.33108644 W 149.21181159 9800.00 48.58 6.86 6346.46 6430.16 6540.81 1274.94 6433.93 69.58E 4.00 1.37 -5.03 5971313.04 597173.34 N 70.33113668 W 149.21179187 9900.00 50.08 1.97 6411.65 6495.35 6566.57 1350.52 6439.72 66.39E 4.00 1.50 -4.89 5971388.68 597178.22 N 70.33134316 W 149.21174432 10000.00 51.78 357.30 6474.69 6558.39 6586.77 1428.12 6439.19 63.45E 4.00 1.70 -4.67 5971466.26 597176.75 N 70.33155515 W 149.21174809 BHRZ 10091.11 53.48 353.25 6530.00 6613.70 6600.25 1500.25 6433.20 60.98E 4.00 1.87 -4.45 5971538.31 597169.89 N 70.33175221 W 149.21179618 10100.00 53.65 352.86 6535.28 6618.98 6601.31 1507.35 6432.34 60.75E 4.00 1.95 -4.34 5971545.40 597168.94 N 70.33177162 W 149.21180315 End Crv 10167.12 55.00 350.00 6574.43 6658.13 6607.86 1561.25 6424.20 --- 4.00 2.01 -4.26 5971599.20 597160.15 N 70.33191890 W 149. 6 V-122P61 Tgt 10168.12 55.00 350.00 6575.00 6658.70 6607.93 1562.06 6424.06 --- 0.00 0.00 0.00 5971600.00 597160.00 2 N 70.33192110 W 149.2 0 TKC4 10168.14 55.00 350.00 6575.01 6658.71 6607.94 1562.07 6424.06 --- 0.00 0.00 0.00 5971600.01 597160.00 N 70.33192114 W 149.21 92 10325.03 55.00 350.00 6665.00 6748.70 6620.21 1688.64 6401.74 --- 0.00 0.00 0.00 5971726.29 597136.15 N 70.33226696 W 149.21205005 LCU l TKB 10325.05 55.00 350.00 6665.01 6748.71 6620.21 1688.65 6401.74 -- 0.00 0.00 0.00 5971726.30 597136.15 N 70.33226700 W 149.21205007 TD / 7" Csg Pt 10425.03 55.00 350.00 6722.36 6806.06 6628.03 1769.31 6387.51 --- 0.00 0.00 0.00 5971806.77 597120.96 N 70.33248738 W 149.21216487 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-3a06 (S-U)1PIan V-122 (S-U)\Plan V-122P61\V-122P61 (P3) Generated 9/21/2006 1:24 PM Page 2 of 2 by Schlumherger ~" V-122P61 (P3) FIELD Prudhoe Bay Unit - WOA 53RND, D~E V-Pad Ma9neFC Paameter ace L ^ ocatvn NAD2] glaska Slab Planes. Zorre 04. US Feet scelbneous MoUei BGGM 2008 D0 ~ _a ~. _. em _ Fn 21 Lat NIO t9 J9580 NoM~rg 89899E.350 f1US Gra Canv •O fi9b]t ~' Slot Pbn VJa061S ~UI ND ReI Robry Ta0le rBJ >Ofl aOove MGLI Mag Dec •23949' I t W149 15 50 303 EasFn9 590]5590flU5 Scale Fact. 0999909J566 Plan. V~122PBI IPJI Srvy Date. 5 emEer 21, 2008 0 1200 2400 3600 4800 6000 0 1200 2400 `o 0 N C_ 3600 a~ D 4800 6000 7200 200 900 i00 300 )00 200 0 1200 2400 3600 4800 6000 Vertical Section (ft) Azim = 74.52°, Scale = 1(in):1200(ft) Origin = 0 N/-S, 0 E/-V by Schlumberger WELL GIELU STRUCTURE V-122PB1 (P3) Prudhoe Bay Unit - WOA V-Pad Maynelic Paamelers Su~ak Luwdx~ NRp2] Alasla Salle PWres. Zone Dd. US E~1 MrsceAar-ous Abdel: BGGM 2006 Uip. 606]6' pale. Saplemdir 21.2006 Lat. N]019 J9.560 N~Mdny: 6969560.:A M15 GM Gonv. .069J01I6J Sbl- Plan V-?a0fi 1S~U1 TVp Rei. Rdary lade 163.]OXa6uve MSLI May L4~ ~2?Ydy' FS- 51625.1 nT Lan. W1<91650.J0? EaWr~y 6y0]6'v 9011115 Sra@Fad'. 0.!&9'J(YJJ666 Play V~122PB11P9) 5 pNe' Se m gam6a, zl, zoos 0 800 1600 2400 3200 4000 4800 5600 6400 2400 n A Z 1600 O O C a~ ~ 800 v V V 0 -800 lOE122 Tgt 3 ..............:..................................:..................................:..................................:..................................:..................................:..................................:.....................................................................:................ N /b~1zz rgl z __ i V-122P81 (P TD / T' Csg Pt 122 Tgt 1 .. ... V-t22P61 Tgt End Crv crv a10o ..............~..................................i..................................i..................................s..................................i..................................: Crv 3.51700 ~ 9.515" Csg Pt EL~p Crv Intl Cn RTE ~ .............. ..................................:..................................:..................................~..................................i..................................:..................................«.................................,..................................:................ Crv 3.5/700 KOP Qltl 1.51100 2400 1600 800 0 -800 0 800 1600 2400 3200 4000 4800 5600 6400 c« W Scale=1(in):800(ft) E »> BP Alaska Anticollision Report Company: BP Amoco Field: Prudhoe Bay Reference Site: PB V Pad Reference Well: Plan V-122 (S-U) Reference Wellpath: Plan V-122PB1 __ NO GLOBAL SCAN: Using user defined selection & scan criteria ', Interpolation Method: MD Interval: 5.00 ft ', Depth Range: 28.50 to 10425.03 ft Maximum Radius:10000.00 ft ~', Survey Program for Definitive Wellpath Date: 8/19/2002 Validated: No ', Planned From To Survey ft ft 28.50 800.00 Planned: Plan #3 V1 800.00 2200.00 Planned: Ptan #3 V1 800.00 3548.00 Planned: Plan #3 V1 3548.00 10425.03 Planned: Plan #3 V1 Casing Points Date: 9/21/2006 'time: 13:31:25 Page: 1 Co-ordinate(NE) Reference: Well: Plan V-122 (S-U), True North Vertical (TVD) Reference: V-122 Plan S-U 83.7 Db: Oracle Reference: Principal Plan & PLANNED PROGRAM Error Model: ISCWSA Ellipse ', Scan Method: Trav Cylinder North ', Error Surface: Ellipse + Casing Version: 4 Toolcode Tool Name GYD-GC-SS Gyrodata gyro single shots MWD MWD -Standard MWD+IFR+MS MWD +IFR + Multi Station MWD+IFR+MS MWD +IFR + Multi Station MD TVD Diameter Hole Size Name ft ft in in 3547.54 2753.70 9.625 12.250 9 5/8" ~! 10425.03 ~_ 6806.06 7.000 8.750 7" Summary - <-______~___- Offset Wellpath ---------> Reference -- offset Ctr-Ctr Na-Go Altownble - Site Well Wellpath MD ~ Distance Area Deviation Warning ft ft ft ft ft ~I PB V Pad Plan V-04 (N-O) Plan V-04 V2 Plan: Pla 685.92 675.00 190.61 12.89 177.72 Pass: Major Risk ~ PB V Pad I Plan V-121 (S-R) Plan V-121 V2 Plan: PI 1058.71 1070.00 36.73 17.69 19.04 Pass: Major Risk I PB V Pad Plan V-205 (S-P) Plan V-205 V6 Plan: PI 605.11 605.00 76.60 11.43 65.17 Pass: Major Risk j PB V Pad Plan V-205 (S-P) Plan V-205L1 OBa V3 PI 605.11 605.00 76.60 11.43 65.17 Pass: Major Risk ', PB V Pad Plan V-205 (S-P) Plan V-205L2 OA V4 Pla 605.11 605.00 76.60 11.43 65.17 Pass: Major Risk ', PB V Pad Plan V-217 (S-O) Plan V-217 V1 Plan: PI 504.33 505.00 60.61 9.50 51.11 Pass: Major Risk ', PB V Pad V-01 V-01 V15 470.11 470.00 105.95 8.47 97.48 Pass: Major Risk PB V Pad V-02 V-02 V12 761.32 770.00 271.02 12.84 258.19 Pass: Major Risk PB V Pad V-03 V-03 V7 1069.75 985.00 144.74 16.52 128.23 Pass: Major Risk PB V Pad V-100 V-100 V7 454.92 455.00 15.55 7.70 7.85 Pass: Major Risk ',' PB V Pad V-101 V-101 V7 655.63 645.00 343.66 10.92 332.74 Pass: Major Risk PB V Pad V-102 V-102 V5 635.32 620.00 247.16 12.02 235.14 Pass: Major Risk ', PB V Pad V-103 V-103 V6 484.91 475.00 187.43 8.45 178.98 Pass: Major Risk PB V Pad V-104 V-104 V13 681.47 675.00 294.02 11.40 282.62 Pass: Major Risk PB V Pad V-105 V-105 V13 829.17 835.00 171.61 13.78 157.83 Pass: Major Risk PB V Pad V-106 V-106 V10 696.37 685.00 181.14 11.08 170.06 Pass: Major Risk PB V Pad V-106 V-106A V9 130.89 130.00 190.17 2.50 187.66 Pass: Major Risk PB V Pad V-106 V-106APB1 V6 130.89 130.00 190.17 2.50 187.66 Pass: Major Risk i PB V Pad V-106 V-106AP62 V2 130.89 130.00 190.17 2.50 187.66 Pass: Major Risk PB V Pad V-106 V-106AP63 V2 130.89 130.00 190.17 2.50 187.66 Pass: Major Risk PB V Pad V-107 V-107 V5 771.47 780.00 246.10 12.36 233.74 Pass: Major Risk PB V Pad V-108 V-108 V7 504.61 495.00 378.40 8.84 369.56 Pass: Major Risk PB V Pad V-109 V-109 V2 660.94 665.00 282.96 10.92 272.04 Pass: Major Risk ', PB V Pad V-109 V-109PB1 V5 660.94 665.00 282.96 10.92 272.04 Pass: Major Risk PB V Pad V-109 V-109P62 V2 660.94 665.00 282.96 10.92 272.04 Pass: Major Risk PB V Pad ~ V-111 V-111 V25 992.24 990.00 140.44 16.80 123.64 Pass: Major Risk ~ PB V Pad V-111 V-111 PB1 V8 992.24 990.00 140.44 16.80 123.64 Pass: Major Risk PB V Pad V-111 V-111 PB2 V2 992.24 990.00 140.44 16.80 123.64 Pass: Major Risk PB V Pad V-111 V-111 PB3 V6 992.24 990.00 140.44 16.80 123.64 Pass: Major Risk ~ PB V Pad V-112 V-112 V7 331.95 330.00 341.26 6.15 335.11 Pass: Major Risk PB V Pad V-113 V-113 V6 475.52 475.00 312.21 7.54 304.67 Pass: Major Risk PB V Pad V-114 V-114 V5 336.68 335.00 250.86 5.82 245.04 Pass: Major Risk PB V Pad V-114 V-114A V4 336.68 335.00 250.86 5.82 245.04 Pass: Major Risk '~ PB V Pad V-114 V-114APB1 V4 336.68 335.00 250.86 5.82 245.04 Pass: Major Risk PB V Pad V-114 V-114AP62 V2 336.68 335.00 250.86 5.82 245.04 Pass: Major Risk PB V Pad V-115 V-115 V5 335.72 335.00 47.70 5.69 42.02 Pass: Major Risk PB V Pad V-115 V-115P61 V4 335.72 335.00 47.70 5.69 42.02 Pass: Major Risk i PB V Pad V-117 V-117 V9 469.35 470.00 15.86 8.07 7.79 Pass: Major Risk PB V Pad V-117 V-117P61 V6 469.35 470.00 15.86 8.07 7.79 Pass: Major Risk PB V Pad V-117 V-117P62 V6 469.35 470.00 15.86 8.07 7.79 Pass: Major Risk PB V Pad V-119 V-119 V13 647.83 650.00 266.06 11.42 254.65 Pass: Major Risk BP Alaska Anticollision Report Company: BP Amoco Field: Prudhoe Bay Reference Site: PB V Pad Reference Wcll: Plan V-122 (S-U) Reference Wcllpath: Plan V-122PB1 Summart <--------- O ffset Wcllpath -------> Site Well Wcllpath PB V Pad V-120 V-120 V5 PB V Pad V-201 V-201 V8 PB V Pad V-Z02 V-202 V9 PB V Pad V-202 V-202L1 V5 PB V Pad V-202 V-202L2 V5 PB V Pad V-203 V-203 V18 i PB V Pad V-203 V-203L1 V6 PB V Pad V-203 V-203L2 V4 PB V Pad V-203 V-203L3 V3 PB V Pad V-203 V-203L4 V3 iii PB V Pad V-204 V-204 V2 PB V Pad V-204 V-204L1 V2 PB V Pad V-204 V-204L1 PB1 V6 ~I, PB V Pad V-204 V-204L2 V2 PB V Pad V-204 V-204L2PB1 V5 PB V Pad V-204 V-204L3 V3 ~ PB V Pad V-204 V-204P61 V9 ! PB V Pad ! V-204 V-204P62 V2 PB V Pad V-210 V-210 V9 PB V Pad V-211 V-211 V5 !~, PB V Pad V-212 V-212 V7 PB V Pad V-213 V-213 VS ~~ PB V Pad V-213 V-213P61 V5 ', PB V Pad V-214 Plan V-214 V1 Plan: PI ! PB V Pad V-214 V-214PB1 V2 ', PB V Pad V-214 V-214PB2 V3 PB V Pad V-214 V-214P63 V5 I PB V Pad V-214 V-214PB4 V2 PB V Pad V-216 V-216 V8 PB V Pad V-221 V-221 V6 Date: 9/21/2006 Time: 13:31:25 Page: 2 Co-ordinate(NF.) Reference: Well: Plan V-122 (S-U), True North Vertical (TVD) Reference: V-122 Plan S-U 83.7 Db: Oracle Reference Offset Ctr-Ctr No-Go Allo~~~able MD MD Distance Area Deviation Warning ft ft ft ft ft -- - 246.60 - 245.00 186.93 4.54 182.38 Pass: Major Risk 587.53 575.00 264.72 9.85 254.86 Pass: Major Risk 704.38 705.00 305.73 12.31 293.42 Pass: Major Risk 704.38 705.00 305.73 12.26 293.47 Pass: Major Risk 704.38 705.00 305.73 12.26 293.47 Pass: Major Risk 641.15 630.00 367.86 12.24 355.62 Pass: Major Risk 1737.77 7715.00 6048.48 No Offset Errors 1700.00 6965.00 5715.48 No Offset Errors 1700.00 6915.00 5680.18 No Offset Errors 641.15 630.00 367.86 12.24 355.62 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass; Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 644.33 645.00 232.84 11.64 221.20 Pass: Major Risk 267.57 265.00 308.93 4.72 304.21 Pass: Major Risk 252.79 250.00 359.26 4.42 354.84 Pass: Major Risk 756.73 745.00 176.11 12.84 163.27 Pass: Major Risk 245.85 245.00 31.46 4.59 26.87 Pass: Major Risk 245.85 245.00 31.46 4.59 26.87 Pass: Major Risk 681.35 675.00 331.02 12.30 318.71 Pass: Major Risk 704,99 700.00 327.95 15.26 312.69 Pass: Major Risk 679.88 670.00 331.35 12.46 318.89 Pass: Major Risk 679.88 670.00 331.35 12.46 318.89 Pass: Major Risk 679.88 670.00 331.35 12.46 318.89 Pass: Major Risk 232.08 230.00 182.45 4.33 178.12 Pass: Major Risk 673.11 660.00 215.90 14.11 201.78 Pass: Major Risk • ~ FieldPrudhoe Bay SitePB V Pad Well:Plan V-122 (S-U) WellpathElan V-122PB1 -3 1 3 300 200 100 0 2 100 200 300 313 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t ~~ ~~~~f ~~~~~~ ( Schlumberger V-122 (P3) Proposal Report Date: September 21, 2006 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure/Slot: V-Pad /Plan V-3a06 (S-U) '~~ Well: ~~~~ Plan V-122 (S-U) ~ Borehole: ~~ Plan V-122 UWIIAPI#: 50029 Survey Name 1 Date: V-122 (P3) /September 21, 2006 Tort I AHD 1 DDI / ERD ratio: 243.288° / 8463.31 ft / 6.548 / 1.26C Grid Coordinate Systerrl: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.32766121, W 149.26397315 Location Grid N/E YIX: N 5969960.500 ftUS, E 590755.900 ftUS Grid Convergence Angle: +0.69307163° Vertical Section Azimuth: 334.32° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 83.70 ft relative to MSL Sea Bed 1 Ground Level Elevation: 55.20 ft relative to MSL Magnetic Declination: 23.949° Total Field Strength: 57625.063 nT Magnetic Dip: 80.878° Declination Date: September 21, 2006 Magnetic Declination Model: BGGM 2006 North Reference: True North Total Corr Mag North •> True North: +23.949° Local Coordinates Referenced To: Well Head :] Measured Vertical Grerlty Comments Inclination Azimuth Sub•Sea TVD TVp NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depfh Section Tool Face ft de ft ft ft ft ft de d 100 ft d 100 ft de 100 ft ftUS ftUS IOp VVnIpSiOGK IUI OO.IL Jb.UV 3JV.UU bb/b.UU Obbtl./U -lS/b.Vb lbbZ.Vb b4L4.Vb 4D.VVL U.UU V.VV 10180.00 56.35 348.39 6581.70 6665.40 -1366.57 1571.70 6422.22 44.09E 16.00 11.40 Base Whipstock 10181.12 56.48 348.24 6582.32 6666.02 -1365.67 1572.61 6422.03 --- 16.00 11.50 Crv 22.5/100 10193.12 56.48 348.24 6588.94 6672.64 -1355.96 1582.40 6419.99 20.52E 0.00 0.00 10200.00 57.94 347.60 6592.67 6676.37 -1350.34 1588.06 6418.78 20.18E 22.50 21.10 10220.00 62.17 345.84 6602.65 6686.35 -1333.41 1604.92 6414.79 19.30E 22.50 21.18 10240.00 66.43 344.22 6611.32 6695.02 -1315.71 1622.32 6410.13 18.60E 22.50 21.28 10260.00 70.70 342.70 6618.63 6702.33 -1297.34 1640.17 6404.83 18.04E 22.50 21.36 10280.00 74.98 341.26 6624.53 6708.23 -1278.40 1658.33 6398.92 17.62E 22.50 21.42 10300.00 79.28 339.87 6628.99 6712.69 -1259.02 1676.71 6392.43 17.31 L 22.50 21.46 10320.00 83.58 338.53 6631.97 6715.67 -1239.32 1695.20 6385.41 17.11 L 22.50 21.49 10340.00 87.88 337.21 6633.46 6717.16 -1219.42 1713.67 6377.90 17.01E 22.50 21.51 90° Pt 10350.00 90.03 336.55 6633.64 6717.34 -1209.44 1722.86 6373.97 17.00E 22.50 21.52 10360.00 92.18 335.89 6633.45 6717.15 -1199.44 1732.01 6369.94 17.01E 22.50 21.52 10380.00 96.48 334.57 6631.94 6715.64 -1179.51 1750.11 6361.59 17.11 L 22.50 21.51 10400.00 100.78 333.22 6628.93 6712.63 -1159.74 1767.86 6352.89 17.31 L 22.50 21.49 10420.00 105.07 331.83 6624.46 6708.16 -1140.26 1785.15 6343.90 17.62E 22.50 21.46 10440.00 109.36 330.39 6618.54 6702.24 -1121.19 1801.88 6334.68 18.05E 22.50 21.42 End Crv 10447.00 110.86 329.87 6616.14 6699.84 -1114.64 1807.58 6331.40 --- 22.50 21.38 Crv 22.5/100 10501.63 110.86 329.87 6596.69 6680.39 -1063.74 1851.73 6305.78 178.96E 0.00 0.00 10520.00 106.72 329.79 6590.77 6674.47 -1046.41 1866.76 6297.04 178.99E 22.50 -22.50 10540.00 102.22 329.71 6585.77 6669.47 -1027.11 1883.49 6287.28 179.01 L 22.50 -22.50 10560.00 97.72 329.63 6582.31 6666.01 -1007.48 1900.48 6277.34 179.02E 22.50 -22.50 U.UU by/1bVU.VV 5y/IbV.UV N /U.331 yZ11U W l4y.ZlltSb`JyU -13.59 5971609.61 597158.04 N 70.33194743 W 149.21188477 -13.35 5971610.52 597157.84 N 70.33194993 W 149.21188629 0.00 5971620.29 597155.69 N 70.33197669 W 149.21190277 -9.31 5971625.93 597154.41 N 70.33199214 W 149.21191255 -8.77 5971642.74 597150.22 N 70.33203821 W 149.21194476 -8.11 5971660.09 597145.35 N 70.33208577 W 149.21198242 -7.60 5971677.86 597139.83 N 70.33213452 W 149.21202530 -7.21 5971695.95 597133.70 N 70.33218416 W 149.21207313 -6.92 5971714.25 597126.99 N 70.33223440 W 149.21212561 -6.73 5971732.65 597119.75 N 70.33228490 W 149.21218244 -6.62 5971751.02 597112.01 N 70.33233538 W 149.21 5 -6.58 5971760.17 597107.98 N 70.33236051 W 149.21 3 -6.58 5971769.27 597103.84 N 70.33238551 W 149.2123 766 -6.62 5971787.26 597095.26 N 70.33243499 W 149.21237529 -6.73 5971804.91 597086.35 N 70.33248350 W 149.21244572 -6.93 5971822.09 597077.16 N 70.33253076 W 149.21251851 -7.21 5971838.70 597067.73 N 70.33257647 W 149.21259321 -7.46 5971844.36 597064.39 N 70.33259205 W 149.21261972 0.00 5971888.19 597038.23 N 70.33271273 W 149.21282728 -0.42 5971903.12 597029.32 N 70.33275382 W 149.21289805 -0.41 5971919.72 597019.36 N 70.33279953 W 149.21297704 -0.39 5971936.59 597009.21 N 70.33284598 W 149.21305758 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-3a06 (S-U)\Plan V-122 (S-U)\Plan V-122\V-122 (P3) Generated 9/21/2006 1:39 PM Page 1 of 2 Measured Vertical Gravdy Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft d de ft ft ft ft ft de de 100 ft de 100 ft d 100 ft ftUS ftUS l UbiSV.UV yS.LJ 3Ly.55 bbtlV.4U btili4.1U -ytS /.1i4 1y1 /.ti5 tiLti/.L/ 1 /y.U3L L1.5U -"L'L.SU -U.:iti by/1y53.ti4 5ytiyy2f.y:S N /U.3J"LtfylyU W 14y.11 ;1'I ;iyltf V-122 Tgt 1 / Crv 10594.34 90.00 329.50 6580.00 6663.70 -973.37 1930.00 6260.00 179.26R 22.50 -22.50 -0.38 5971965.89 596991.52 N 70.33292666 W 149.21319803 10/100 10600.00 89.43 329.51 6580.03 6663.73 -967.72 1934.88 6257.13 179.26R 10.00 -10.00 0.13 5971970.74 596988.59 N 70.33294000 W 149.21322131 10620.00 87.43 329.53 6580.58 6664.28 -947.80 1952.11 6246.98 179.26R 10.00 -10.00 0.13 5971987.84 596978.24 N 70.33298709 W 149.21330344 10640.00 85.43 329.56 6581.82 6665.52 -927.91 1969.32 6236.87 179.26R 10.00 -10.00 0.13 5972004.92 596967.92 N 70.33303412 W 149.21338539 10660.00 83.43 329.59 6583.76 6667.46 -908.07 1986.48 6226.79 179.25R 10.00 -10.00 0.13 5972021.96 596957.63 N 70.33308103 W 149.21346704 10680.00 81.43 329.61 6586.39 6670.09 -888.32 2003.58 6216.75 179.25R 10.00 -10.00 0.13 5972038.94 596947.39 N 70.33312776 W 149.21354830 End Crv 10685.12 80.92 329.62 6587.18 6670.88 -883.28 2007.94 6214.20 --- 10.00 -10.00 0.13 5972043.27 596944.78 N 70.33313968 W 149.21356901 Crv 10/100 10875.41 80.92 329.62 6617.20 6700.90 -696.00 2170.05 6119.16 23.27R 0.00 0.00 0.00 5972204.20 596847.80 N 70.33358276 W 149.21433879 10880.00 81.34 329.80 6617.91 6701.61 -691.48 2173.96 6116.87 23.24R 10.00 9.19 4.00 5972208.08 596845.47 N 70.33359346 W 149.21 10900.00 83.18 330.60 6620.60 6704.30 -671.71 2191.16 6107.03 23.14R 10.00 9.19 3.97 5972225.16 596835.41 N 70.33364046 W 149.21~~ 10920.00 85.02 331.39 6622.65 6706.35 -651.85 2208.56 6097.38 23.05R 10.00 9.20 3.94 5972242.44 596825.55 N 70.33368801 W 149.214 2 10940.00 86.86 332.17 6624.07 6707.77 -631.92 2226.13 6087.94 23.OOR 10.00 9.20 3.92 5972259.90 596815.91 N 70.33373605 W 149.21459162 10960.00 88.70 332.95 6624.84 6708.54 -611.95 2243.87 6078.74 22.97R 10.00 9.21 3.91 5972277.52 596806.49 N 70.33378452 W 149.21466620 V-122 Tgt 2 10974.07 90.00 333.50 6625.00 6708.70 -597.88 2256.43 6072.40 20.20R 10.00 9.21 3.90 5972290.00 596800.00 N 70.33381885 W 149.21471753 10980.00 90.56 333.70 6624.97 6708.67 -591.95 2261.74 6069.76 20.20R 10.00 9.38 3.45 5972295.28 596797.30 N 70.33383337 W 149.21473888 11000.00 92.43 334.40 6624.45 6708.15 -571.96 2279.72 6061.01 20.22R 10.00 9.38 3.46 5972313.15 596788.34 N 70.33388250 W 149.21480972 11020.00 94.31 335.09 6623.27 6706.97 -552.00 2297.77 6052.49 20.26R 10.00 9.38 3.47 5972331.10 596779.60 N 70.33393184 W 149.21487870 11040.00 96.19 335.79 6621.44 6705.14 -532.09 2315.89 6044.22 20.33R 10.00 9.38 3.48 5972349.11 596771.10 N 70.33398135 W 149.21494573 End Crv 11051.22 97.24 336.18 6620.13 6703.83 -520.95 2326.06 6039.68 --- 10.00 9.38 3.50 5972359.23 596766.45 N 70.33400916 W 149.21498245 TD / 4-1/2" Lnr 11528.52 97.24 336.18 6560.00 6643.70 -47.70 2759.22 5848.44 --- 0.00 0.00 0.00 5972790.00 596570.00 N 70.33519292 W 149.21653094 • WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V-3a06 (S-U)\Plan V-122 (S-U)1PIan V-122\V-122 (P3) Generated 9/21/2006 1:39 PM Page 2 of 2 by Schlumberger WELL FlELD STRUCTURE V-122 (P3) Prudhoe Bay Unit - WOA V-Pad Ma9nebc Pa.amelers 6uRace LoceYOn NAD2] Alazka Slate Planes, 2olw OG. US Feei Miuelbneo~s Motley. BGGM 2006 Dip. 808]8' Qate September 21.200fi Lai: N]01939.580 NoMm9. 5%9960.50 flU5 Grk COnv •06930]16J' Sbr Plan V-3x0615-U) NO ReI: Ropry ia0la (B3.]O 1l above MSL) Map Dao. .33.90.9' F5: 5]fi25.1 nT Loo. W1C91550303 Eas8n9 590]55.90 flU6 Scale FacL.09599093566 V-122 (P]) firry ate. fiepiembel 21.2006 6400 O N 6600 C 0) f0 U ~ s8oo -1400 -1200 -1000 -800 -600 -400 -200 0 I (P3) Top Whipstock Base Whipstock ~ y_t 22 Tgt 7 /Crv 10F100 : TD / 4-1/2" Lnr .-..-..-.. .-. ._.._.._.._.._.._.. _..-..-.._.._.._.._..-..-t.- ._.._.._.. _..-.._.._.. y..-..-..-..-..-. ' 4 Crv 22.bl100 Crv 22.bH 00 End Crv: .-.._..-..*..-..-..-..-..-..-..-..-..~..-..-..-.._..-..-..-..-.~_.._.._.. _.._..-. ..-..-h_ .-..-..-..-..-.:_. -..-..-..-..-..-.:- .-..-.. ..-..-.. -:.- -. - .-..-. -..-..-..-..-..-.. -..- -..-..-..-..-..-..-..- .-..-..-..-..-. - - - -..-..-.. 7. ~/. . ~.. -.. . y.. ..*.. ..r. Z~ lb 122 Tgt 1 122 Tgt 2 -..-..-..-..- - .- . LCU~/ TKl3 . - ..-..-..-. -.._..-..- -..-..-..-..-..-..-..-. ..-..-. - -..-..-..- -..-..-. -..-..-..- .-..-..-..-..-..-..-..-.i- .-..-..-..-..-..-..-.. 90° P[ End Crv Crv tOH 00 End Crv ................... V-12T Tgt Z -722P81 (P3) 6400 6600 saoo • • -1400 -1200 -1000 -800 -600 -400 -200 0 Vertical Section (ft) Azim = 334.32°, Scale = 1(in):200(ft) Origin = 0 N/-S, 0 E/-V by • • Schlumberger WELL V-122 (P3) FIELp Prudhoe Bay Unit - WOA STRUCTURE V-Pad ~ I Mapnatic Poremelers Surface Locatgn NAp1] nla5a0 Sbte Planes. Zone 01. U5 Feet Miuella na0uz MoEal: EGGM 200fi Qp: 808]8' pale Septem5er 11. 2006 LaL. N]01939590 NoMirp'. 596990050 RUS GrM p0nV. v0.~30]16l' SbL. Pon V-3a061S~U1 Np Rel: RoVry Ta51e 163 ]0 Ra0pve MSLI Map 0.c. ~139a9' F5. 5]6151nT Lm W1191550.303 Easeng: 590]5590 RUS Scale Fact. 0.9099093566 Plan. V~111 (P3) Srvy pale. Sapember 31, 1006 5600 5800 6000 6200 6400 2800 2600 2400 n n n Z 0 0 N 2200 C N (6 U v 2000 V 1800 1600 V-122 (P3) TD I4-1 /2" Lpr N 2800 2600 2400 2200 2000 1800 1600 5600 5800 6000 6200 6400 «< W Scale = 1(in):200(ft) E »> BP Alaska Anticollision Report ! Company: BP Amoco Field: Prudhoe Bay ~ Reference Site: PB V Pad I Reference Well: Plan V-122 (S-U) Reference Wellpath: Plan V-122 ! NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 5.00 ft Depth Range: 10168.12 to 11528.52 ft Maximum Radius:10000.00 ft __ _ _ Survey Program for Definitive Wellpath _ ii Date: 9/21/2006 Validated: No Planned From To Survey ft ft _ - - - 28.50 800.00 Planned: Plan #3 V1 (0) 800.00 3548.00 Planned: Plan #3 V1 (0) 3548.00 10168.12 Planned: Plan #3 V1 (0) ! 10168.12 11528.52 Planned: Plan #3 V2 Casing Points MD "CAD Diameter Hole Size Name ft ft in in ! 3547.54 2753.70 9.625 12.250 9 5/8" 110168.12 6658.70 7.000 8.750 7" '~ 11528.52 6643.70 4.500 6.750 4 1 /2" Summary !~ <- ---------- Offset Wellpath ---------> 55tc Well Wellpath Date: 9!21/2006 Time: 13:46:22 Page: 1 Co-ordinate(NE) Reference: Well: Plan V-122 (S-U), True North Vertical (TVD) Reference: V-122 Plan S-U 83.7 Dh: Oracle Reference: Princi al Pla & PLANNED PROGRAM p Error Model: p ISCWSA EIIi se Scan Method: Trav Cylinder North Error Surface: Ellipse + Casing Version: 3 Toolcode Tool Name GYD-GC-SS Gyrodata gyro single shots ~i MWD+IFR+MS MWD +IFR + Multi Station i MWD+IFR+MS MWD +IFR + Multi Station I MWD+IFR+MS MWD +IFR + Multi Station ...._ Reference Offset Ctr-Ctr No-Co Allowable MD M~D Distance Area Deviation Warning ft ft ft ft ft ~I PB V Pad Plan V-04 (N-O) Plan V-04 V2 Plan: Pla Out of range !, PB V Pad Plan V-121 (S-R) Plan V-121 V2 Plan: PI Out of range PB V Pad Plan V-122 (S-U) Plan V-122P61 V4 Plan: 10170.00 10170.00 0.00 0.66 -0.65 FAIL: NOERRORS ' ' PB V Pad Plan V-205 (S-P) Plan V-205 V6 Plan: PI 11462.08 9608.49 4873.00 107.99 4765.00 Pass: Major Risk ! PB V Pad Plan V-205 (S-P) Plan V-205L1 OBa V3 PI 11527.94 10670.00 3386.48 99.84 3286.65 Pass: Major Risk PB V Pad Plan V-205 (S-P) Plan V-205L2 OA V4 Pla 11526.09 10640.00 3426.83 99.36 3327.47 Pass: Major Risk PB V Pad Plan V-217 (S-Q) Plan V-217 V1 Plan: PI 10909.10 5137.54 5883.59 87.68 5795.91 Pass: Major Risk '! PB V Pad V-01 V-01 V15 10650.00 2580.00 8149.39 79.03 8070.36 Pass: Major Risk PB V Pad V-02 V-02 V12 11528.98 6490.00 6665.22 78.37 6586.84 Pass: Major Risk PB V Pad V-03 V-03 V7 Out of range PB V Pad V-100 V-100 V7 10929.59 8405.00 3478.44 130.24 3348.20 Pass: Major Risk PB V Pad V-101 V-101 V7 Out of range PB V Pad V-102 V-102 V5 Out of range PB V Pad V-103 V-103 V6 Out of range PB V Pad V-104 V-104 V13 Out of range PB V Pad V-105 V-105 V13 Out of range PB V Pad V-106 V-106 V10 Out of range PB V Pad V-106 V-106A V9 Out of range PB V Pad V-106 V-106AP61 V6 Out of range PB V Pad V-106 V-106APB2 V2 Out of range PB V Pad V-106 V-106APB3 V2 Out of range PB V Pad V-107 V-107 V5 Out of range PB V Pad ~ V-108 V-108 V7 Out of range ~ PB V Pad V-109 V-109 V2 11011.37 6245.00 4956.08 85.87 4870.21 Pass: Major Risk I PB V Pad V-109 V-109PB1 VS 11011.37 6245.00 4956.08 85.87 4870.21 Pass: Major Risk PB V Pad V-109 V-109P62 V2 11011.37 6245.00 4956.08 85.87 4870.21 Pass: Major Risk i PB V Pad V-111 V-111 V25 Out of range ' PB V Pad V-111 V-111 P61 V8 Out of range PB V Pad V-111 V-111 P62 V2 Out of range ! PB V Pad V-111 V-111 P63 V6 Out. of range PB V Pad V-112 V-112 V7 Out of range li PB V Pad V-113 V-113 V6 Out of range PB V Pad V-114 V-114 V5 11246.25 3145.00 8591.39 79.16 8512.23 Pass: Major Risk PB V Pad V-114 V-114A V4 11262.86 3100.00 8591.91 78.75 8513.16 Pass: Major Risk j PB V Pad V-114 V-114APB1 V4 11262.92 3100.00 8591.84 78.79 8513.05 Pass: Major Risk ', PB V Pad V-114 V-114APB2 V2 11262.86 3100.00 8591.91 78.75 8513.16 Pass: Major Risk PB V Pad V-115 V-115 V5 10650.00 3995.00 6133.89 83.48 6050.41 Pass: Major Risk PB V Pad V-115 V-115P61 V4 10650.00 3995.00 6133.89 83.48 6050.41 Pass: Major Risk PB V Pad V-117 V-117 V9 10650.00 2590.00 7406.37 80.71 7325.66 Pass: Major Risk PB V Pad V-117 V-117P61 V6 10650.00 2590.00 7406.37 80.71 7325.66 Pass: Major Risk B 1 k P A as a Anticollision Report Company: BP Amoco ' Field: Prudhoe Bay '~I Reference Site: PB V Pad Reference WeII: Plan V-122 (S-U) Reference Wellpath: Plan V-122 Summary <------------- - C-ffset Wellpath ----- ------> i i Site Well Wellpath j PB V Pad V-117 V-117P62 V6 PB V Pad V-119 V-119 V13 ' PB V Pad V-120 V-120 V5 PB V Pad V-201 V-201 V8 PB V Pad V-202 V-202 V9 PB V Pad V-202 V-202L1 V5 ~~ PB V Pad V-202 V-202L2 VS ii PB V Pad V-203 V-203 V18 ~, PB V Pad V-203 V-203L1 V6 PB V Pad ~ V-203 V-203L2 V4 ' PB V Pad V-203 V-203L3 V3 PB V Pad V-203 V-203L4 V3 PB V Pad V-204 V-204 V2 PB V Pad V-204 V-204L1 V2 ', PB V Pad V-204 V-204L1 P61 V6 ' PB V Pad V-204 V-204L2 V2 ' PB V Pad I V-204 V-204L2PB1 V5 I PB V Pad V-204 V-204L3 V3 ', PB V Pad V-204 V-204P61 V9 ' PB V Pad V-204 V-204PB2 V2 PB V Pad V-210 V-210 V9 PB V Pad V-211 V-211 V5 PB V Pad V-212 V-212 V7 ' PB V Pad V-213 V-213 V5 PB V Pad V-213 V-213P61 V5 PB V Pad V-214 Plan V-214 V1 Plan: PI PB V Pad V-214 V-214P61 V2 PB V Pad V-214 V-214P62 V3 I PB V Pad V-214 V-214P63 V5 ' PB V Pad V-214 V-214PB4 V2 ' PB V Pad V-216 V-216 V8 PB V Pad V-221 V-221 V6 Date: 9/21/2006 Time: 13:46:22 Page: 2 i Co-ordinate(NE) Reference: Well: Plan V-122 (S-U), True North ~ Vertical (TVD) Reference: V-122 Plan S-U 83.7 Dh: Oracle Reference Offset Ctr-Ctr Na-Go Allo~~°able MD Mll Distance Area Deviation Warning ft - ft ft ft ft __ - 10650.00 _- 2590.00 _ 7406.37 80.71 7325.66 Pass: Major Risk 10650.00 2810.00 8010.62 93.70 7916.92 Pass: Major Risk !, Out of range ' Out of range ' Out of range Out of range Out of range Out of range !, Out of range Out of range Out of range Out of range ', Out of range Out of range Out of range ' Out of range Out of range ' Out of range Out of range Out of range Out of range Out of range ', Out of range ', Out of range Out of range ', Out of range Out of range Out of range ' Out of range Out of range Out of range Out of range • • ~ FieldPrudhoe Bay Site PB V Pad Well:Plan V-122 (S-U) WellpathElan V-122 -3 1 3 300 200 100 0 2 100 200 300 -3 1 3 0 Travelling Cylinder Azimuth (TFO+AZI) [degJ vs Centre t • ~ 89-6/125:2 3~8 Terri Hubble BP E~cploration AK lnc. °Mastercard Check" PO Box 19661.2 MB 7-5 < ~ p~,' Anchorage, AK 99519 cArE ,, $ !-~ PAY TO THE O ER OF First NationaF Bank Alaska Anchorag~eJAK 99501 V ' 1 ~~ MEMO: ~: L 2 5 200060:99 X46 2 2 7 L 5 56~~' 0 308 • • PT~# ~ o ~; - f ~ 7 ®evelopment Ser~-ice Exploratory- Stratigraphic Test Non-Conventional W"ell Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK i ADD-ONS TEXT FOR APPROVAL LETTER Vb'HAT (OPTIONS) APPLIES I NILZTI LATERAL The permit is for a new we[Ibore segment of existing well j (If last two digits in , Permit No. , API No. ~0- API cumber are ' - - ' ;between 60-69) ,Production should continue to be reported as a function of the .original API number stated above. PLOT HOLE In accordance with 20 A.4C 25.00~(f), all records, data and logs ' acquired for the pilot hole must be clearly differentiated in both well name (/dBli s'/- f 22. J~/~ ~ and API number j (~0-~~- 2 33 Z Q - Td) from re ~ ds, data and logs j ;acquired for well ~eL,~, d-~2~..~A,I" ~y'~••d.-Z J~•..Z.3j.Zp __ SPACING !The permit is approved subject to full compliance with 20 AAC j EXCEPTION 2~.0>j. Approval to perforate and produce !inject is contingent I !upon issuance of a conservation order approving a ;pacing exception. assumes the i liability of any protest to the spacing exception that may occur. ' DRY DITCH I Al[ dry ditch sample sets submitted to the Commission must be in ~' ' ~ SAMPLE ! no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals ii .through target zones. ;Please note the following special condition of this permit: l iHon-Conventional ;production or production testing of coal bed methane is not allowed 'Wall i for (name of welly until after (Com~anv Name) has designed and i implemented a water well testing program to provide baseline data '~; j on water quality and quantity. ~Companv Name) must contact the Commission to obtain advance approval of such water well testing '~ nrnaram Rev: 1 Z5:'06 C:':jod~`xransmiral checklist I WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, BOREALIS OIL 640130_.- _ _ Well Name: PRUDHOE BAY l1N BORE V-12.2 _ Program DEV _ _ Well bore seg ~ I, PTD#:2061470 Company BP EXPLORATI_ON_(ALASKA~ INC___ _ __ __ _____ _ Initial Class/Type _ _DEV/ 1-OIL GeoArea _ __ ___ Unit __ __ OnlOff Share On_ ____ Annular Disposal ` Administration 11 ~ Permit fee attached- Yes ~2 Lease number appropriate Yes 3 Unique well. name and number Yes - 14 Well located ina defined pool Yes - I~~5 Well located proper distance from drilling unit boundary Yes - - ~16 Well located proper distance from_ other wells- _ Yes '7 Sufficient acreage available in drilling unit Yes 8 If deviated, )s_wellbore plat_included Yes I9 Operator only affected party _ _ _ Yes X10 Operator has_approprate_bond in force _ _ _ _ _ _ Yes _ _ _ _ _ ~ 11 Permit can be issued without conservation order Yes 12 Permitcan be issued without administrative.approval Yes Appr Date 13 Can permit be approved before 15-day wait. Yes RPC 10/1312006 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For_ NA_ 15 All wells within 1/4_mile area of review identified (For service well only) NA. 16 Pre-produced injector: duration of pre production less than_ 3 months (For_service well only) NA_ 17 Nonconven,gasconformstoAS31,06,030(j,1.A),(~2_.A-D) NA_ 18 -- -- Conductor &tring_provided _ _ _ Yes -_ _ _ --- _ _- 20' @ 110', --- - Engineering 119 Surface casing_protects all known USDWs Yes 20 CMT_vol adequate to circulate on conductor & surf csg - Yes Adequate excess. !21 CMT-vol. adequate. to tie-in long string to surf csg No_ ',22 CMT will cover all knownproductive horizons _ Yes !123 Casing designs adequate for C, T, B & permafrost_ Yes - 1124 Adequate tankage_or reserve pit _ _ _ _ _ _ _ Yes _ _ _ _ _ Nabors 9ES. x,25 Ifa_re-drill, has_a 10-403 for abandonment been approved NA_ New well. ~I26 Adequate wellbore separation proposed _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ I27 If diverter required, does it meet regulations_ _ Yes _ _ _ _ _ _ - 128 I Drilling fluid_program schematic & equip list adequate . Yes Max MW_10,9_ppg. Appr Date I29 BOPES, do they meet regulation _ _ _ _ _ Yes _ _ _ _ _ _ _ _ WGA 10/16!2006':30 BOPE_press rating appropriate; test to_(put prig in comments)_ Yes - Test to 3500_psi. MSP 2738 psi, 131 Choke manifold complies w/API_RP-53 (May 84)_ Yes II132 Work will occur without operation shutdown _ _ _ _ _ _ Yes 33 Is presence_of H2S gas probable No_ Not an H2S pad. ';34 Mechanical condition of wells within AOR verified (ForseNice well only) NA 35 Permit can be issued wlo hydrogen sulfide measures No_ 1 Geology 36 Data_presented on potential overpressure zones _ _ _ _ _ _ _ _ NA. . 137 Seismic analysis of shallow gas zones_ _ _ _ _ tJA_ Appr Date '.138 .Seabed condition survey_(ifgff-shore) _ _ _ _ NA_ _ _ RPC 10!16!2006 39 Contact namelphone for weekly_progress reports_ [explora_tory only] NA Geologic Engineering Public Commissioner: Date: Co issio r: Date Commissioner Date ~a-i6 ~z6 • i