Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-159Ima a Pro~ct Well History File Covee~age 9 J XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~j- ~ ~~ Well History File Identifier Organizing (done) RES N Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: o,.a.,be, iiiNmuuiiuii DIGI AL DATA Diskettes, No. ~, ^ Other, No/Type: BY: Maria ~_ Date: t~~ pi Project Proofing BY: Maria Date: Scanning Preparation ~ x 30 = QY: Maria Date: Production Scanning R~,~~~e~e, iiiuiiiuiiuuu OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: ryiiiiiaiiimiiiii P D +_<~~ = TOTAL PAGES__~,ZL_ (Count does not include cover sheet) ~ ^ A lsl ~/ V ~ Stage 1 Page Count from Scanned File: `J V (Count does include cover sheet) Page Count Matches Number in Scanning Pre aration: YES NO BY: Maria Date: ~ ~ /D ~s~ ~~ 111 Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: ~s~ IIIIIII coin lete at this Dint unless rescanning is required. I) I II ~I II I II Scanning is p p Rescanned III IIIIIIIIIII IIIII BY: Maria Date: ~s~ mments about this file: Quality Checked III IIIIII III IIII I Co 1016/2005 Well History File Cover Page.doc ~; .# ~:~ ~. ~> v ,5~; .~ ~... MICROFILMED 6/3.0/2010 DO NOT PLACE. ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc 1 ~~,1 DATA SUBMITTAL COMPLIANCE REPORT 3/26/2009 Permit to Drill 2061590 .Well Name/No. PRUDHOE BAY UN POL W-204L1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23333-60-00 MD 12730 TVD 5050 Completion Date 3/1/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION ~ ~ f!i ,/ Mud Log IVo Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / AZI DEN / NEU !AIM / PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media o Start Stop N CH Received Comments Asc Directional Survey _ 5452 12730 Open _ 3/13/2007 pt Directional Survey 5452 12730 Open 3/13/2007 C Las 1549gr/uensity 5562 12718 Open 10/3/2007 DCAV, DRHB, GR, NPHI, ROBE w/PDS graphics .ED C Lis 15592 "Induction/Resistivity 108 12729 Open field data 10/26/2007 LIS Veri, GR, ROP, FET, RPS, DRHO, NPHI w/PDS graphics og Induction/Resistivity 2 Blu 1 5450 12730 Open 10/26/2007 MD Vision Service 7-Feb- 2007 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y N Chips Received? ~17N" Analysis ~l.bL- Received? Daily History Received? ~.:/ N Formation Tops 7 N DATA SUBMITTAL COMPLIANCE REPORT 3/26/2009 Permit to Drill 2061590 Well Name/No. PRUDHOE BAY UN POL W-204L1 Operator BP EXPLORATION (ALASKA) INC MD 12730 TVD 5050 Completion Date 3/1/2007 Completion Status 1-OIL Current Status 1-OIL Comments: Compliance Reviewed By: Date: API No. 50-029-23333-60-00 UIC N Scgiemgerger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job p Log Description NO. 4454 Company: Alaska Oil 8 Gas Cans Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Orion Borealis Date BL Color CD W-213 11661175 MEM TEMPIPRESS SURVEY - 09/29107 1 V-215 Z-108 5-124 S-125P81 V-121 V-222 11594491 11212826 40014242 40015467 40015007 40015319 CH EDIT PDC GR USI - OH WIRELINE PEX EDIT ' OH MWDILWD EDIT OH MWDILWD EDIT -(~ OH MWDILWD EDIT - ~ OH MWDILWD EDIT - ~ 04123107 02/05/06 11/05106 07/07/07 03/24107 06108/07 2 3 2 2 2 1 1 1 1 1 1 W-210 V-218 W-204 40014842 40015068 40014637 OH MWDILWD EDIT _ OH MWDILWD EDIT - OH MWDILWD EDIT ~ 02/26107 04107/07 01129/07 2 2 2 1 1 1 W-204PB7 W-204L1 W-204L2 40014637 40014637 40014637 OH MWDILWD EDIT OH MWDILWD EDIT - ON MWDILWD EDIT 1c 01/24107 02107/07 02/20107 2 1 1 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Ina _.. Petrotechnical Data Center LR2-1- - - ' 900 E Benson Blvd. Anchorage AK 99508-425'4, Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth n 1on9ro7 Received byh..J(~~/~-~ Dale Delivered: '1r°~`-' r Schle~~erger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description N0.4454 Company: Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Orion Borealis Date BL Color CD W-213 11661175 MEM TEMP/PRESS SURVEY 09129/07 1 V-215 Z-108 11594491 11212828 CH EDIT PDC GR USIT OH WIRELINE PEX EDIT ` 04/23107 02105/06 2 1 1 5-124 5-125P81 V-72i V-222 W-210 40014242 40015467 40015007 40015319 40014842 OH MWDILWD EDIT OH MWDILWD EDIT OH MWDILWD EDIT ~ OH MWDILWD EDIT ~ OH MWDILWD EDIT - 11/05106 07/07/07 03/24107 O6I08/07 02126/07 3 2 2 2 2 1 i 1 1 i V-218 W-204 40015066 40014637 OH MWDILWD EDIT OH MWDILWD EDIT 04/07/07 01/29107 2 2 1 1 W-204PB7 W-204L7 40014637 40014637 OH MWDILWD EDIT OH MWDILWD EDIT 01/24107 02107107 2 1 1 1 W-204L2 40014637 OH MWDILWD EDIT >f~ 02120107 1 1 PLEASE ACKNOWLEDGE RECEIPT BV SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 ' ' I' 900 E Benson Blvd. ~ ~ Anchorage AK 99508-4254, - Schlumberger-DCS 2525 Gambetl SL Suite 400 Anchorage, AK 99503-2838 ATTN: Beth n 10/19107 Date Delivered: .;~;^'~'~" za - Received by~_.J~,~/~-~ i .- , _ Date 09-20-2007 Transmittal Number:92904 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) f you have any questions, please contact Douglas Dortch at the PDC at 564-4973 Deliver Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 09-15A ao~ ~uaa ~` ~S`/~r6 AGI-10Aao~--3S ~ i5~%~a __ F-01A c~0(o-tbt * IS</b3 ¢r5~/~y F-01 AP61 _ ___ ___ F-09Bao~-nt3 ~ ~5~/4!S F-42A aC~~- U`73 ~ 15L1~s~ L-204L1 ate.-p~i3 ~ r5~/~~ L-204L2 avt,- p9 y " tS~/~sj L-204L3 a(~(o-OAS ~ J5~/g"1 L-204L4 a U(o-p~ ~ ~ t Sc! ~ Zj V-205L1 ~U~,- l~f ~ lScl~a V-205L2 aUto_!~a ~ 1 S~3 W-204L1_c2UCa-/_S9 _'r r_55!gy - W-204L2 w~o'llo_O r t~~~4 5 WGI-09_ USC Via(. - ly(o ~` t 5-L!~}(o_ Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 Ivy Alaska Otl aS ORS. OtI1ftH Revised OS/09/07: Put on Production -- o.~ RECEIVE ' STATE OF ALASKA MAY ~t~1~@~OIL AND GAS CONSERVATION COMMISSION ' & G LC COMPL~s }ON OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil ^ Gas Pugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.,os zoAaczs.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 03/01/2007 12. Permit to Drill Number 206-159 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 2/4/2007 13. API Number 50-029-23333-60-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 2/7/2007 14. Well Name and Number: W-204L1 FEL, SEC. 21, T11N, R12E, UM FSL, 1176 4859 Top of Productive Horizon: 835' FSL, 869' FEL, SEC. 16, T11 N, R12E, UM (OBc) 8. KB Elevation (ft): 81.52' 15. Field /Pool(s): Prudhoe Bay Field /Polaris Pool Total Depth: 2703' FSL, 942' FEL, SEC. 09, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD) 12730 + 5050 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 612049 y- 5959836 Zone- ASP4 10. Total Depth (MD+TVD) 12730 + 5050 Ft 16. Property Designation: ADL 028261 TPI: x- 612335 y- 5961096 Zone- ASP4" - 5968242 Zone- ASP4 th: x- 612139 Total De 11. Depth where SSSV set None MD 17. Land Use Permit: y p 18. Directional Survey ~ Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD I GR / RES / AZI DEN / NEU /AIM / PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT .SIZE WT. PER FT. .GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 4-1/2" 12.6# L-80 5525' 12703' 5041' 5050' 6-3/4" Uncemented Slotted Liner 4-1 /2" 12.6# L-80 5468' 5639' 5021' 5072' N/A N/A -Tieback Liner 23. Perforations open to Production (MD + TVD of Top and 24. TuewG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Sections Reported on W-204 MD TVD MD TVD 6016' - 7412' 5073' - 5032' 5021' 7826' 10390' 5051' 2~j, ACID, FRACTURE, CEMENT cJOUEEZE, ETC. - - 10804' - 12658' 5032' - 5049' DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED 5528' Top of Window ~,p~ j,~, 26. PRODUCTION TEST Date First Production: Reported on W-204 W a~ Method of Operation (Flowing, Gas Lift, etc.): ~f See1" 29410-407 (Dated 12/27/06, PTD #206 89;?~ for Production & Test Data Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO FIOW TUbing PreSS. CaSing PreSSUre CALCULATED 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). '.Od Submit core chips; if none, state "none". ~~ I, None -~.. ~~ ( 1~6F~ Form 10-407 Revised 12/2003 ONTINUED ON REVERSE .SIDE R I ~ I N A~ ~ ~~ >~A~ ~ ~ goo, _ ~ 28 • 29. ~ T GEOLOGIC MARKE ORMATION ESTS Include and briefly summarize test results. List intervals tested, Na,ME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". From W-204 None Schrader Bluff OBc 5,527' 5,042' From W-204L1 Schrader Bluff OBc 7,796' 5046' Schrader Bluff OBc 12,618' 5,049' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ J TQ Signed Terrie Hubble / Title Technical Assistant Date /V 7~D W-204L1 206-159 Prepared eyName/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Ken Allen, 564-4366 s INSTRUCTIONS GeNew-r.: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only STATE OF ALASKA ~ ~~~~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG MAR` -~ ,~ c~ LiU1 Alaska Oil &Gas ~~~'~} C::`~ar~iss[on 1a. Well Status: ®Oil ^Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One O 1b. Welt Class: nC f ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date om , Susp., or Ab 03/01/2007 ~ 12. Permit to Drill Number 206-159 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 2/4/2007 13. API Number 50-029-23333-60-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 2/7/2007 14. Well Name and Number: W-204L1' 4859 FSL, 1176 FEL, SEC. 21, T11N, R12E, UM Top of Productive Horizon: 835' FSL, 869' FEL, SEC. 16, T11 N, R12E, UM (OBc) 8. KB Elevation (ft): 81.52' ~ 15. Field / Poot(s): Prudhoe Bay Field /Polaris Pooh Total Depth: 2703' FSL, 942' FEL, SEC. 09, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD) 12730 + 5050 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 612049 y- 5959836 Zone- ASP4 10. Total Depth (MD+TVD) 12730 + 5050 Ft 16. Property Designation: ADL 028261 TPI: x- 612335 y- 5961096 Zone- ASP4 Total Depth: x- 612139 y- 5968242 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: ~if~/iYD~I~ S.Sa~'MO S MWD / GR / RES / AZI DEN / NEU /AIM / PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD' SETTING DEPTH TVD HOLE AMOUNT SIZE Wr. PER FL GRADE TOP - - BOTTOM ' TOP BOTTOM SIZE CEMENTING RECORD PULLED 4-1/2" 12.6# L-80 5525' 12703' 5041' 5050' 6-3/4" Uncemented Slotted Liner 4-1/2" 12.6# L-80 5468' 5639' 5021' 5072' N/A N/A -Tieback Liner 23. Perforations open to Production (MD + TVD of Top and 24: Tu6-rrG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Sections Reported on W-204 MD TVD MD TVD 6016' - 7412' 5073' - 5032' 7826' - 10390' 5051' - 5021' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10804' - 12658' 5032' - 5049' DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED 5528' Top of Window 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing PfeSS. Casing Pressure CALCULATeD 24-HOUR RATE OIL-BBL GAS-McF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". '" ~ '~~1 None ~ ~ APR ~ .~ 2D07 ~=1-I~~ ? er~t~ Form 10-407 ReVISed 12/2003 ~ CONTINUED ON REVERSE SIDE ~~ ,,` ... ~i ! ~ ti,.l f ~j~ i~ 28. GEOLOGIC MARKER.. 29. ORMATION TESTS Include and briefly summarize test resuks. List intervals tested, Na,Me MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". From W-204 None Schrader Bluff OBc 5,527' 5,042' From W-204L1 Schrader Bluff OBc 7,796' 5046' Schrader Bluff OBc 12,618' 5,049' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ /~Q Signed Terrie Hubble Title Technical Assistant Date / Q W-204L1 206-159 Prepared By Name/Number.~ Terrie Hubble, 564-4628 Well Number Drilling Engineer: Ken Allen, 564-4366 Permit No. / A royal No. INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Irene 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". ITEM 29: List atl test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original ONy BP EXPLORATION Page 18 of 34 Operations Summary Report ~~~ ~ L1 Legal Well Name: W-204 ~"1.. Common Well Name: W-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From - To Hours Task Code NPT 2/1/2007 23:30 - 00:00 0.50 EVAL P 2/2/2007 00:00 - 01:00 1.00 EVAL P 01:00 - 04:00 3.00 EVAL N 04:00 - 06:30 2.50 EVAL P 06:30 - 10:30 4.00 EVAL P 10:30 - 11:30 1.00 EVAL P 11:30 - 12:00 0.50 EVAL P 12:00 - 13:30 1.50 STWHIP P 13:30-17:30 4.00 STWHIP P 17:30 - 18:00 I 0.50 I STW H I P I P 18:00 - 19:00 1.00 STWHIP P 19:00 - 00:00 5.00 STWHIP P 12/3/2007 ~ 00:00 - 01:00 ~ 1.00 ~ STW H I P ~ P 01:00 - 02:00 I 1.001 STWHIPI P 02:00 - 06:00 4.001 STWHIP P 06:00 - 08:30 2.50 STWHIP P 08:30 - 09:00 0.50 STWHIP P 09:00 - 09:30 0.50 BOPSU P 09:30 - 12:00 2.50 BOPSU N 12:00 - 13:00 1.00 BOPSU~P 13:00 - 13:30 0.50 BOPSU P 13:30 - 17:30 4.00 BOPSU P 17:30 - 18:00 0.50 BOPSUFj P 18:00 - 20:30 2.50 STWHIP N 20:30-23:00 ~ 2.50~STWHIP~P SFAL HMAN SFAL Spud Date: 12/29/2006 Start: 12/29/2006 End: 3/1 /2007 I Rig Release: 3/1 /2007 Rig Number: ~~~ ~_ (~" ~~.. P~~~ Phase Description of Operations --- - - ~Q ~~ ----- -- -- RUNPRD Lost 11 bbls of mud to well bore in 24 hrs. RUNPRD Pick up and make up USIT and CBL tools RUNPRD Trouble shoot logging tools at surface. Unable to obtain power between tools. Change out Gamma Ray. RUNPRD Run in the hole with USIT and CBL. RUNPRD Log with USIT and CBL while pulling out of the hole. RUNPRD Rig down Schlumberger wire line. RUNPRD Ad'ust brakes. WEXIT Make up OBc whip stock assembly. WEXIT Run in the hole form 1170' to 5567'. Shallow pulse test MW D at 1266' 255 gpm, 870 psi. WEXIT Oreint whipstock 17 LHS. Up 100k. S/O 95k. Insert dummy seal assy. into tie back sleeve. Set down 15k to set whipstock. Pull 10k up wt. to confrim whipstock set.Set down 45k to shear mills from whipstock. WEXIT Test seal assy to 1500 psi for 5 min. Displace SFMOBM to 9.0 ppg LSOBM at 300 gpm, 1910 psi. WEXIT Milling window from 5528' to 5540' + 6' new hole to 5546'. Up wt 110k. S/O wt. 95k. Rot wt. 105k. Tq 4k. 276 gpm, 1600 psi. WOB 3 to 5k. TOW ~ 5528' BOW @ 5540' WEXIT Drill from 5546' to 5559'. Up wt 110k. S/O wt. 95k. Rot wt. 105k. Tq 4k. 276 gpm, 1600 psi. WOB 3 to 5k. WEXIT Pump 25 bbl sweep while working window area from 5528' to 5559'. Work mills across window with no pumps or rotation. No problems. 110k Up wt. 95k S/O wt. WEXIT Monitor well bore for 10 min. Static. Pump dry job. Putl out of the hole from 5559' to 1170'. WEXIT Rack back 4" HWDP and 4-3/4" steel drill collars in the derrick. Break, Gauge and lay down mills. Upper watermelon mill full gauge. Clear and clean rig floor. WEXIT Pick up perforated sub and flush BOP. WEXIT Pull wear bushing. Install test plug. WEXIT Attempt to remove blind rams and install blind shear rams. Bolts on ram doors had been over tightened from previous blind shear ram change out. Inspect bolts and threads for damage. Change blind rams to blind shear rams. Rig up test equipment. Test BOP's and all associated valves to 250 psi 5 min low, 3500 psi 5 min high. BOP test witnessed by AOGCC rep Jeff Jones. BP WSL Chris Clemens. Nabors tool pusher Larry W urdeman. WEXIT Rig down test equipment. Pull test plug install wear bushing. WEXIT AIM in XP motor failed surface test. Mobilize motor from Schlumberger yard (Back up motor with 50 hours on it OK). While waiting on motor extra HWDP was picked up and stood back in the derrick. Slip and cut 119' of drilling line. New motor passed surface test. Pick up BHA consisting of RR# 7, 6-3/4" DSZ146H+GJUW Bit, WEXIT WEXIT WEXIT WEXIT Printed: 3/5/2007 7:03:14 AM BP EXPLORATION Operations Summary Report Legal Well Name: W-204 Common Well Name: W-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 7ES Date From - To Hours Task ~ Code NPT 2/3/2007 120:30 - 23:00 I 2.50 I ST W H I P I P 23:00 - 00:00 I 1.001 STWHIPI P 2/4/2007 00:00 - 02:30 2.50 ST W H I P P 02:30 - 03:30 1.00 STWHIP P ~'~ Irk 03:30 - 04:30 1.00 DRILL P 04:30 - 05:00 I 0.501 DRILL I N I SFAL 05:00 - 05:30 0.50 DRILL N SFAL 05:30 - 06:30 1.00 DRILL N SFAL 06:30 - 07:00 0.50 DRILL N SFAL 07:00 - 12:00 5.00 DRILL P Start: ~ 12/29/2006 Rig Release: 3/1/2007 Rig Number: Page 19 of 34 ~ Spud Date: 12/29/2006 End: 3/1 /2007 Phase Description of Operations W EXIT 1.5 degree XP motor w/AIM, Float sub, NM stb, NM flex lead dc, MWD, VPWD, ADN, (3) NM flex dc, Jars = 237'. W EXIT Run in the hole with BHA #8 from 237' to 1480'. Shallow pulse test MWD at 333', 250 gpm, 980 psi. W EXIT Run in the hole from 1480' to 5396'. W EXIT Obtain ECD base line. Up wt. 100k. S/O wt. 90k. Rot wt. 100k. 60 rpm, 3k tq. 288 gpm, 2174 psi. Orient HS and run in the hole from 5396' to 5494'. No problem's. PROD2 Directional drill under gauge hole from 5494' to 5559'. Directional drill 6-3/4" hole from 5559' to 5626'. 295 gpm, 2190 psi. PROD2 Directional drillers display continually crashing which in turn causes entire MW D system to crash. Attempt to trouble shoot system. PROD2 Pull out of the hole from 5626' to 5494'. Blow down top drive. Monitor well bore. Static. PROD2 Trouble shoot MW D software. Service top drive. PROD2 Run in the from 5494' to 5626'. No problems thru window area. PROD2 Directional drill 6-3/4" Obc L1 from 5626' to 6164'. Up wt. 110k. S/O wt. 95k. Rot wt. 95k. 60 rpm, tq on 4.5k. Tq off 3k. WOB 10 to 15k. 290 gpm, 2472 psi on, 2260 psi off. Mud wt. Out 9.0 ppg. Out 9.0 ppg. AST = 2.10 hrs. ART = 1.55 hrs. ADT = 3.65 hrs. Jar hrs. _ 195 Calculated ECD = 9.86 Actual ECD = 10.07 12:00 - 19:30 7.50 DRILL P PROD2 Directional drill 6-3/4" Obc L1 from 6164' to 6803'. Up wt. 115k. S/O wt. 85k. Rot wt. 95k. 60 rpm, tq on 5k. Tq off 4k. WOB 5 to 10k. 302 gpm, 2425 psi on, 2160 psi off. 19:30 - 20:00 0.50 DRILL N RREP PROD2 20:00 - 22:30 2.50 DRILL P PROD2 22:30 - 23:30 ~ 1.00 ~ DRILL I N ~ SFAL ~ PROD2 Calculated ECD = 9.97 Actual ECD = 10.33 Drilling with #1 mud pump. #2 mud pumps pop off inadvertently blew at 2300 psi. Remove and replace pop off valve. Change swab in #1 mud pump, #3 cly. Directional drill 6-3/4" Obc L1 from 6803' to 6964'. Up wt. 117k. S/O wt. 85k. Rot wt. 95k. 60 rpm, tq on 4.5k. Tq off 4k. WOB 5k. 302 gpm, 2560 psi on, 2390 psi off. Circulate at a reduced rate while trouble shooting MWD surface equipment. Directional drillers display continually crashing which in turn causes entire MWD system to crash. Turn power off to DD Unit, able to keep system up and running. Suspect moisture in one or more of lines coming from rig floor to MWD unit. Orientation of tools maintained between DD and MWD by utilizing hand held communication. Mobilize power cord from Schlumberger yard. 23:30 - 00:00 0.50 DRILL P PROD2 Directional drill 6-3/4" Obc L1 from 6964' to 7025'. Up wt. 117k. S/O wt. 85k. Rot wt. 95k. 60 rpm, tq on 5k. Tq off 4k. WOB 10k. 308 gpm, 2595 psi on, 2470 psi off. Mud wt. In 9.1 ppg. Out 9.1 ppg. AST = 1.50 hrs. ART = 3.25 hrs. ADT = 4.25 hrs. Jar hrs. _ 199.75 Printed: 3/5/2007 7:03:14 AM BP EXPLORATION Operations Summary Report Legal Well Name: W-204 Common Well Name: W-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From - To Hours Task Code ~ NPT i 2/4/2007 23:30 - 00:00 0.50 DRILL P 2/5/2007 00:00 - 12:00 12.00 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 12/6/2007 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 12/7/2007 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 19:00 I 7.001 DRILL I P 19:00 - 20:00 I 1.001 DRILL I P 20:00 - 00:00 ~ 4.00 ~ DRILL ~ P Start: 12/29/2006 Rig Release: 3/1/2007 Rig Number: Page 20 of 34 ~ Spud Date: 12/29/2006 End: 3!1 /2007 Phase Description of Operations PROD2 Calculated ECD = 10.07 Actual ECD = 9.75 PROD2 Directional drill 6-3/4" Obc L1 from 7025' to 7881'. Up wt. 123k. S/O wt. 75k. Rot wt. 98k. 60 rpm, tq on 5k. Tq off 4k. WOB 5 to 7k. 305 gpm, 2676 psi on, 2466 psi off. Mud wt. In 9.1 ppg. Out 9.1 PPg• AST = 2.88 hrs. ART = 2.23 hrs. ADT = 5.11 hrs. Jar hrs. _ 204.9 Calculated ECD = 10.41 Actual ECD = 10.56 PROD2 Directional drill 6-3/4" Obc L1 from 7881' to 8796'. Up wt. 140k. S/O wt. 85k. Rot wt. 100k. 60 rpm, tq on 5.5k. Tq off 4k. WOB 5 to 7k. 302 gpm, 3100 psi on, 2900 psi off. Mud wt. In 9.0+ ppg. Out 9.0+ ppg. AST = 1.67 hrs. ART = 4.25 hrs. ADT = 5.92 hrs. Jar hrs. _ 210.8 Calculated ECD = 10.57 Actual ECD = 10.85 PROD2 Directional drill 6-3/4" Obc L1 from 8796' to 9936'. Up wt. 135k. S/O wt. 85k. Rot wt. 103k. 60 rpm, tq on 6k. Tq off 5k. WOB 7k. 301 gpm, 3121 psi on, 3033 psi off. Mud wt. In 9.0+ ppg. Out 9.0+ ppg. AST = 1.38 hrs. ART = 3.35 hrs. ADT = 4.73 hrs. Jar hrs. _ 215.5 Calculated ECD = 10.40 Actual ECD = 10.80 PROD2 Directional drill 6-3/4" Obc L1 from 9936' to 11274'. Up wt. 135k. S/O wt. 80k. Rot wt. 103k. 60 rpm, tq on 7k. Tq off 6k. WOB 5 to 7k. 300 gpm, 3195 psi on, 3095 psi off. Mud wt. In 9.1 ppg. Out 9.1 ppg. AST = 1.00 hrs. ART = 4.33 hrs. ADT = 5.33 hrs. Jar hrs. _ 221 Calculated ECD = 10.50 Actual ECD = 10.78 PROD2 Directional drill 6-3/4" Obc L1 from 11274' to 12164'. Up wt. - 160k. S/O wt. 55k. Rot wt. 100k. 60 rpm, tq on 8k. Tq off 6.5k. WOB 5 to 8k. 304 gpm, 3463 psi on, 3285 psi off. Mud wt. In 9.1 ppg. Out 9.1 PP9• AST = 2.25 hrs. ART = 2.83 hrs. ADT = 5.08 hrs. Jar hrs. _ 226 Calculated ECD = 10.60 Actual ECD = 10.90 PROD2 Directional drill 6-3/4" Obc L1 from 12164' to 12730'. Up wt. 155k. S/O wt. 40k. Rot wt. 97k. 60 rpm, tq on 8k. Tq off 7k. WOB 8 to 10k. 300 gpm, 3575 psi on, 3432 psi off. Mud wt. In 9.1 PP9. Out 9.1 PP9 AST = .93 hrs. ART = 2.75 hrs. ADT = 3.68 hrs. Jar hrs. _ 229.65 Calculated ECD = 10.69 Actual ECD = 11.43 PROD2 Circulate bottoms up at 300 gpm, 3385 psi, While down linking , MWD. Monitor well bore. Static. PROD2 Back ream /Mad pass at 600'/ hr. from 12730 to 11828'. 300 gpm, 3410 psi. 60 rpm, 7k tq. Encountered increased tq and Printed: 3/5/2007 7:03:74 AM BP EXPLORATION Page 21 of 34 Operations Summary Report Legal Well Name: W-204 Common Well Name: W-204 Spud Date: 12/29/2006 Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task 1Code~ NPT ` Phase ~ Description of Operations 2/7/2007 20:00 - 00:00 4.00 DRILL P PROD2 slight pack off at 11870'. Work area free of any futher obstructions. 2/8/2007 00:00 - 05:00 5.00 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 11828' to 10987'. 300 ', gpm, 3295 psi. 60 rpm, 7k tq. Up wt. 150k. S/O wt. 75k. Rot wt. 100k. Chang swab out in #2 pump #3 cly, At 11795' 249 gpm, 2427 psi. 05:00 - 07:00 2.00 DRILL N DFAL PROD2 Unable to toggle MWD tool over to real time logs. 07:00 - 09:00 2.00 DRILL P PROD2 Back ream /Mad pass at 300'/ hr. from 10987' to 10796'. 291 - gpm, 2945 psi. 60 rpm, 6k tq. Up wt. 140k. S/O wt. 75k. Rot wt. 100k. 09:00 - 10:00 1.00 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 10796' to 10546'. 290 gpm, 2947 psi. 60 rpm, 6k tq. Up wt. 140k. S/O wt. 80k. Rot wt. 103k. 10:00 - 11:30 1.50 DRILL P PROD2 Back ream /Mad pass at 300'/ hr. from 10546' to 10346'. 290 _ gpm, 2877 psi. 60 rpm, 6k tq. Up wt. 140k. S/O wt. 80k. Rot wt. 110k. 11:30 - 12:00 0.50 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 10346' to 10154'. 290_ gpm, 2877 psi. 60 rpm, 5k tq. Up wt. 140k. S/O wt. 83k. Rot wt. 100k. Average loss rate of 3 to 6 bbls an hour. Lost 54 bbls of LSOBM to well bore in 12 hrs. 12:00 - 18:30 6.50 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 10154' to 8097'. 300 gpm, 3090 psi. 60 rpm, 5k tq. Up wt. 140k. S/O wt. 85k. Rot wt. 100k. 18:30 - 20:30 2.00 DRILL P PROD2 Back ream /Mad pass at 300'/ hr. from 8097' to 7896'. 300 gpm, 2660 psi. 60 rpm, 4k tq. Up wt. 130k. S/O wt. 85k. Rot wt. 95k. 20:30 - 21:30 1.00 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 7896' to 7647'. 300 gpm, 2600 psi. 60 rpm, 4k tq. Up wt. 120k. S/O wt. 90k. Rot wt. 92k. 21:30 - 23:30 2.00 DRILL P PROD2 Back ream /Mad pass at 300'/ hr. from 7647' to 7446'. 300 gpm, 2515 psi. 60 rpm, 3.5k tq. Up wt. 115k. S/O wt. 85k. Rot wt. 95k. 23:30 - 00:00 0.50 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 7446' to 7312'. 300 gpm, 2320 psi. 60 rpm, 3.5k tq. Up wt. 115k. S/O wt. 85k. Rot wt. 95k. Average loss rate of 3 to 6 bbls an hour. Lost 55 bbls of LSOBM to well bore in 12 hrs. 109 bbls of LSOBM lost to well bore in 24 hrs. 2/9/2007 00:00 - 06:00 6.00 DRILL P PROD2 Back ream /Mad pass at 600'/ hr. from 7312' to 5896'. 300 gpm, 2320 psi. 60 rpm, 3.5k tq. Up wt. 115k. S/O wt. 85k. Rot wt. 95k. 06:00 - 09:30 3.50 DRILL P PROD2 Back ream /Mad pass at 100'/ hr. from 5896' to 5660'. 60 rpm, 3.5k tq. Up wt. 110k. S/O wt. 95k. Rot wt. 98k. Printed: 3/5/2007 7:03:14 AM BP EXPLORATION Page 22 of 34 Operations Summary Report .Legal Well Name: W-204 ',Common Well Name: W-204 Spud Date: 12/29/2006 Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/9/2007 106:00 - 09:30 I 3.501 DRILL I P 09:30 - 11:30 I 2.001 DRILL I P 11:30 - 12:30 I 1.001 DRILL I P 12:30 - 13:30 1.00 DRILL P 13:30 - 15:30 2.00 DRILL P 15:30 - 16:30 1.00 DRILL P 16:30 - 21:00 4.50 DRILL P 21:00 - 23:00 ~ 2.00 ~ DRILL ~ P 23:00 - 00:00 ~ 1.00 I DRILL ~ P 12/10/2007 100:00 - 01:00 I 1.001 DRILL I P 01:00 - 08:00 I 7.001 DRILL ~ P 08:00 - 11:00 3.00 DRILL P 11:00 - 13:00 2.00 DRILL P 13:00 - 15:00 2.00 DRILL P 15:00 - 15:30 0.50 DRILL P 15:30 - 16:30 1.00 DRILL P 16:30 - 18:00 1.50 WHIP P 18:00 - 20:30 2.50 WHIP P 20:30 - 22:00 1.50 WHIP P 22:00 - 23:30 1.50 WHIP P 23:30 - 00:00 0.50 WHIP P 12/11 /2007 100:00 - 00:30 ~ 0.50 ~ W HIP ~ P PROD2 Pump rate slowed from 300 gpm, 2320 psi to 230 gpm, 1450 psi. Mad passing was slowed to a 100'/hr due to ECD increasing to 12.2 ppg. PROD2 Pull out of the hole from 5660' to 5560'. Encountering 40k over pull and Slight packing off at 5560'. Work tight area from 5560' to 5528'. Rotation and full circulation was regained. 305 gpm, 2183 psi. Up wt. 110k. S/O wt. 100k PROD2 Reciprocate pipe from 5494' to 5396' while circulating bottoms up at 305 gpm, 2154 psi. 80 rpm, 2k tq. PROD2 Cut and slip 100' of drilling line. PROD2 Service top drive and crown section. Change burnt out lights in derrick. PROD2 Orient 17 LHS. Down linking of MWD tool worked at 5494' PROD2 Run in the hole from 5494' to 12730'. No problems. No fill on bottom. Up wt. 140k. S/O wt. 70k. Note: Increase of 30k S/O wt. PROD2 Rotate and reciprocate pipe while circulating bottoms at 60 rpm, 5k tq. 300 gpm, 3425 psi. Pump 25 bbl 2.5 ppb over weighted sweep surface to surface. 10% increase in cuttings once weighted sweep came back to surface. Up wt 140k. S/O wt 70k. Rot wt. 105k. Mud wt In 9.0 ppg. Out 9.0 ppg. PROD2 Displace LSOBM out of well bore with SFOBM at 305 gpm, 3425 psi. 60 rpm, 5k tq. Lost 30 bbls of LSOBM in 24 hrs. PROD2 Displace LSOBM out of well bore with SFOBM at 305 gpm, 3425 psi. 60 rpm, 5k tq. Mud wt in 9.0 ppg. Out 9.0 ppg. Monitor well bore. Static. PROD2 Pull out of the hole from 12730' to 5540'. Monitor well bore. Average loss rate of 1 bbl/hr. Pump dry job. Recording Up and S/O wt every 5 stands pulled while in open hole. PROD2 Continue to pull out of the hole from 5540' to 1480'. PROD2 Lay down extra drill pipe not needed, from 1480' to 811'. PROD2 Remove nuclear source. Lay down jar. Stand back NM DC's and lay down remaining BHA. PROD2 Clear and clean rig floor. PROD2 Run in the hole with 2 stands of 4-3/4" sprial dc's and lay down the same. RUNPRD Make up Whipstock retrieval assembly. Hook, Float Sub, 1 joint 3-1/2" HWDP, Bumper Sub, Oil Jar, MWD. Orient MWD. RUNPRD Pick up (36) 4-3/4" steel drill collars. RUNPRD Shallow pulse test MWD at 1286'. Run in the hole with 4" HWDP to 2202'. RUNPRD Run in the hole with whipstock assembly to 5451'. RUNPRD Fill pipe and orient 17 deg. left of high side. Wash out slot on whipstock, 243 gpm, 1882 psi. Up wt. 135k. S/O wt. 120k. Lost 29 bbls of LSOBM in 24 hrs. RUNPRD Pick up above top of whipstock at 5528'. Slack off slowly and hook whipstock slot at 5533', set 15k down wt. to verify hook, Printetl: 3/5/2W/ /:U:S:lanm ~ ~ BP EXPLORATION Page 23 of 34 ', Operations Summary Report Legal Well Name: W-204 Common Well Name: W-204 Spud Date: 12/29/2006 Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/11/2007 100:00 - 00:30 0.50 WHIP P RUNPRD pick up to 150k (15k over) allow oil jars to bleed down and pull to 200k. S/O and recock jar at 100k. Jared whipstock free at 210k. Mud level dropped 26' after seals were pulled free. Fill hole and monitor well bore. Static loss rate of 36 bbl/hr. ~ 00:30 - 01:30 1.00 WHIP P RUNPRD Circulate bottoms up at 270 gpm 2341 psi. Mud wt. In 9.0 ppg. Out 9.0 ppg. Monitor well bore for 15 min. Static. 01:30 - 06:00 4.50 WHIP P RUNPRD Pump dry job. Drop 2-1/16" rabbit. Pull out of the hole from 5520' to 2200'. 06:00 - 08:00 2.00 WHIP P RUNPRD Stand 4" HWDP and 4-3/4" steel drill collars in the derrick. 08:00 - 10:30 2.50 WHIP P RUNPRD Lay down whipstock retrieval BHA. Whipstock looked good. 12 ft. from top of whipstock to well bore exit indication. 10:30 - 11:00 0.50 WHIP P RUNPRD Clear and clean rig floor. 11:00 - 11:30 0.50 WHIP P RUNPRD Service top drive. 11:30 - 15:00 3.50 WHIP N RREP RUNPRD Change out wash pipe assembly on top drive. 15:00 - 16:00 1.00 CASE P RUNPRD Rig up Nabors casing equipment to run OBc L1 4.5" liner. 16:00 - 00:00 8.00 CASE P RUNPRD Pick up 4.5" 12.6# L-80 slotted liner with bent shoe joint. Run in the hole 5703". Up wt. 80k. S/o wt. 75k. First attempt to exit window failed. Turn liner 1 full turn to the right and exit window. Make up torque 3,800 fUlbs. Run 1 4.5" x 6.125" free floating centralizer on every full lenght joint .Record Up and S/O wt every 500'. Lost 27 bbls of SFOBM to well bore. 2/12/2007 00:00 - 03:00 3.00 CASE P RUNPRD Run in the hole with 4.5" slotted liner from 5703' to 7184'. Make up Hook hanger and Slim Pulse MWD. 03:00 - 04:00 1.00 CASE P RUNPRD Make up Slim Pulse MWD to Hook hanger. Run in the hole with 1 stand of HWDP to 7294'. Up wt. 90k. S/O wt 75k. 04:00 - 05:00 1.00 CASE N RREP RUNPRD Attempt to test MWD. Wash pipe on top drive leaking SFOBM from top nut. Torque upper nut on wash pipe to 6,000 fUpds. Test wash pipe OK. 05:00 - 08:00 3.00 CASE P RUNPRD Pulse test MWD at 126 gpm, 790 psi. Good test. Run in the hole with 9 stands of HWDP and 4-3/4" drill collars from 7276' to 9105'. Up wt. 130k. S/O wt.100k. 08:00 - 11:00 3.00 CASE P RUNPRD Change out handling equipment. Run in the hole from 9105' to 12660' with 4" drill pipe. Up wt. 160k. S/O wt. 80k. 11:00 - 12:30 1.50 CASE P RUNPRD Oreint Baker Hook Hanger at 17 deg left of high side at 120 gpm 1020 psi. Up wt 170k. S/O wt. 60k. Set hook hanger at 5525'. Observered tool face to right of high side after setting hook hanger. Pick hook hanger off of bottom of window, turn liner 180 deg and run in the past hook hanger setting depth, pick up and orient hook hanger at high side and set hook hanger at 5525'. Final reading of MWD when setting was 34 deg R of highside, Shoe Depth - 12702' Solid Bent Joint - 12700' - 12658'. 45 Jts Slotted Liner - 12656' - 10844'. Swell Packer #1 - 10793' - 10773'. 8 Jts Solid Liner - 10761' - 10470'. Swell Packer #2 -10418' - 10398'. Printed: 3/5/2007 7:03:14 AM ~ ~ BP EXPLORATIO(V Page 24 of 34 Operations Summary Report Legal Well Common W Event Name Contractor Rig Name: Date Name: ell Name: : D Name: N N From - To W-204 W-204 RILL+C ABOBS ABOBS Hours OMPLE ALASK 7ES Task TE A DRI Code ~ LING NPT Start I Rig R Rig N Phase Spud Date: 12/29/2006 : ~ 12/29/2006 End: 3/1/2007 elease: 3/1/2007 umber: Description of Operations 2/12/2007 11:00 - 12:30 1.50 CASE P RUNPRD 62 Jts Slotted Liner -10388' - 7865'. Swell Packer #3 - 7814' - 7794'. 8 Jts Solid Liner - 7783' - 7491'. Swell Packer #4 - 7440' - 7420'. 34 Jts Slotted Liner - 7410' - 6141'. 9 Jts Solid Liner - 5989' - 5656'. Swell Packer #5 - 5594' - 5574'. Top of Hook Hanger - 5525'. (166) 4.5" x 5.75" Free Floating Centralizers run. 12:30 - 13:00 0.50 CASE P RUNPRD Drop ball and pump down on seat. Pressure up to 3500 psi to release from hook hanger. Ball sheared at 3998 psi. 13:00 - 13:30 0.50 CASE P RUNPRD Monitor well bore. Circulate bottoms up at 250 gpm, 1337 psi. 13:30 - 16:00 2.50 CASE P RUNPRD Monitor well bore. Pump dry job. Pull out of the hole to 1921'. 16:00 - 20:00 4.00 CASE P RUNPRD Lay down (27) 4-3/4" drill collars. Stand (3) 4-3/4" drill collars and (9) HWDP in the derrick. 20:00 - 21:00 1.00 CASE P RUNPRD Lay down running tool and MWD slim pulse tool. 21:00 - 21:30 0.50 CASE P RUNPRD Clear and clean rig floor. 21:30 - 00:00 2.50 CASE N RREP RUNPRD Replace back up wrench on top drive. Lost 13 bbls of SFOBM to well bore in 24 hrs. 2/13/2007 00:00 - 01:30 1.50 CASE N RREP RUNPRD Replace back up wrench on top drive. Function test back up wrench. Ok. 01:30 - 02:30 1.00 CASE P RUNPRD Rig up Nabors casing equipment. 02:30 - 05:00 2.50 CASE P RUNPRD Pick up LEM assembly. 05:00 - 06:00 1.00 CASE P RUNPRD Run in the hole with LEM assembly to 170'. 06:00 - 09:30 3.50 CASE P RUNPRD RIH w/ 9 stands of HWDP and continue w/4" drillpipe to 5579'. MU topdrive & pump 1 bpm, 160 psi. Stage pumps up to 2 bpm, 320 psi, PU wt. 110K, SO wt 100K. 09:30 - 11:00 1.50 CASE P RUNPRD Tag Hook Hanger w/LEM muleshoe at 5524'. RIH. Wash down slowly to remove debris f/lower seal bore extension. Run seals into seal bore extension at 5631'. RIH until muleshoe is at 5641'. See LEM orient and lock in. SO 15K on Hook. PU 10K over string wt to 120K to verify collet latch in. Drop 1-3/4" ° Baker ball and pump to seat. Pressure to 3800 psi. Felt ~~ ~ packer set at 2000 psi. HR running tool shear went at 2800 psi. \~ ' ~ Released f/LEM. Tested annulus to 1500 psi and held f/5 ~~ O minutes indicating seals on ZXP packer properly placed and faCL~'~ ~~'L holding pressure. Pull one stand and pump dry job. Blow down top drive and lines. Top of OBc lateral #1 LEM (liner top) at 5468'. ~< 11:00 - 14:00 3.00 CASE P RUNPRD POH w/running tools f/5468' to 1087'. 14:00 - 15:00 1.00 CASE P RUNPRD Service topdrive. PJSM w/written THA. Slip and cut 84' of drilling line. 15:00 - 15:30 0.50 CASE P RUNPRD POH to LEM HR running tool. 15:30 - 17:30 2.00 CASE P RUNPRD LD HR running tool assy and 2 3/8" inner string. 17:30 - 18:00 0.50 STWHIP P WEXIT oad Whipstock equipment in pipeshed and RU to run OBa hipstock. t~~ ~ 18:00 - 21:30 3.50 STWHIP P WEXIT PJSM. MU Whipstock an mi ing assy. ~t9 n 21:30 - 23:00 1.50 STWHIP P WEXIT PJSM. RIH w/ drill collars and HWDP to 1225'. Surface test Lam" MWD 250gpm, 887 psi. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH Whipstock and millimg HBA on 4" drill pipe to 2659'. 2/14/2007 00:00 - 03:30 3.50 STWHIP P WEXIT RIH (12659'. PU wt 112K, SO wt. 100K. Orient Whipstock to 22 Printed: 3/5/2007 7:03:14 AM by ~w~,~ ~chl~ma~rger ~~,~~;~ W-204L1 Survey Report Report Date: 8-Feb-07 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 1.550° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: W-PAD / W-204 ND Reference Datum: Rotary Table Well: W-204 ND Reference Elevation: 81.52 ft relative to MSL Borehole: W-204L1 Sea Bed /Ground Level Elevation: 52.60 ft relative to MSL UWI/API#: 50292333360 Magnetic Declination: 23.860° Survey Name /Date: W-204L1 /February 8, 2007 Total Field Strength: 57638.403 nT Tort /AHD / DDI / ERD ratio: 330.491 ° / 8571.40 ft / 6.851 / 1.688 Magnetic Dlp: 80.889° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 07, 2007 Location LatlLong: N 70.29921663, W 149.09253499 Magnetic Declination Model: BGGM 2006 location Grid NIE Y/X: N 5959836.120 ftUS, E 612049.120 ftUS North Reference: True North Grid Convergence Angle: +0.85435553° Total Corr Mag North -> True North: +23.860° (:rid Selo FaMnr n QQQQ1d9R Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n n n n n n n de oo n nUS nUS RTE GYD CT DMS Last GYD CT DMS MW D+IFR+MS U.UU U.UU U.UU 100.00 0.34 149.95 169.00 0.40 143.89 200.00 0.69 151.96 258.00 0.85 159.49 300.00 0.77 147.72 400.00 0.98 146.00 500.00 0.83 147.45 600.00 0.99 142.21 700.00 0.83 150.26 797.00 0.24 143.69 922.98 0.37 318.09 1018.61 0.79 323.25 1114.01 0.73 329.39 1210.23 0.90 353.85 1303.82 1.01 342.17 1399.07 1.25 356.69 1495.44 1.09 355.76 1592.28 1.20 356.89 1687.44 0.79 330.62 1781.85 0.83 352.86 1877.80 1.13 2.11 1973.78 0.96 2.84 -tf 7 .5L 18.48 87.48 118.48 176.47 218.47 318.46 418.44 518.43 618.42 715.41 841.39 937.02 1032.41 1128.62 1222.20 1317.43 1413.78 1510.60 1605.74 1700.15 1796.08 1892.05 V.VU V.VV U.VV 100.00 -0.25 0.30 169.00 -0.62 0.74 200.00 -0.87 1.04 257.99 -1.57 1.81 299.99 399.98 499.96 599.95 699.94 -2.09 -3.35 -4.64 -5.91 -7.20 2.41 3.93 5.51 7.10 8.69 796.93 922.91 1018.54 1113.93 1210.14 1303.72 1398.95 1495.30 1592.12 1687.26 1781.67 1877.60 1973.57 V.VV 0.30 0.74 1.04 1.81 2.40 3.92 5.50 7.08 8.67 V.VV -0.26 -0.63 -0.88 -1.59 -2.12 -3.40 -4.72 -6.01 -7.32 -7.96 9.59 9.57 -8.10 -7.87 9.94 9.43 -8.01 -7.13 10.91 8.47 -7.25 -6.10 12.18 7.21 -6.20 -4.83 13.52 5.92 -4.92 -3.32 15.08 4.51 -3.40 -1.50 16.95 3.07 -1.57 0.46 18.91 2.54 0.40 2.39 20.85 3.33 2.33 3.95 22.47 4.38 3.89 5.18 23.79 5.38 5.14 6.81 25.43 6.95 6.77 8.56 27.18 8.68 8.52 V.VV V.VV VAV.7VJV.IG VILVY~.IG IY /V.GJJGIVVV •• I~V.v~/G../v~VV 0.15 0.34 5959835.87 612049.27 N 70.29921592 W 149.09253378 0.39 0.10 5959835.50 612049.52 N 70.29921491 W 149.09253181 0.54 0.97 5959835.25 612049.68 N 70.29921422 W 149.09253058 0.86 0.33 5959834.54 612050.00 N 70.29921228 W 149.09252803 1.12 0.44 5959834.01 612050.27 N 70.29921083 W 149.09252592 1.96 0.21 5959832.75 612051.13 N 70.29920734 W 149.09251915 2.82 0.15 5959831.44 612052.01 N 70.29920373 W 149.09251212 3.74 0.18 5959830.16 612052.95 N 70.29920020 W 149.09250468 4.63 0.20 5959828.87 612053.86 N 70.29919662 W 149.09249748 5.10 0.61 5959828.10 612054.34 N 70.29919450 W 149.09 4.99 0.48 5959828.19 612054.22 2 N 70.29919475 W 149.092 4.38 0.44 5959828.94 612053.61 N 70.29919682 W 149.09249 8 3.68 0.11 5959829.98 612052.89 N 70.29919969 W 149.09250517 3.29 0.40 5959831.25 612052.48 N 70.29920318 W 149.09250836 2.96 0.24 5959832.76 612052.13 N 70.29920732 W 149.09251104 2.64 0.39 5959834.59 612051.78 N 70.29921234 W 149.09251361 2.51 0.17 5959836.55 612051.63 N 70.29921771 W 149.09251465 2.39 0.12 5959838.48 612051.47 N 70.29922298 W 149.09251564 2.01 0.63 5959840.04 612051.07 N 70.29922726 W 149.09251869 1.61 0.33 5959841.28 612050.65 N 70.29923066 W 149.09252196 1.56 0.35 5959842.92 612050.58 N 70.29923513 W 149.09252238 1.63 0.18 5959844.67 612050.62 N 70.29923991 W 149.09252178 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 1 of 8 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de n n n n n n n de 100 tt ftUS nUS LU /U.1 U 2165.30 2261.77 2357.09 2452.78 2547.41 2643.42 2737.28 2833.00 2928.85 3024.05 3119.93 3215.85 3288.00 3348.85 3443.74 3538.42 3635.18 3730.28 3827.95 3922.15 4019.84 4116.03 4211.01 4306.19 4401.96 4497.91 1 .U4 0.84 0.83 2.40 4.50 6.89 9.03 11.06 11.65 11.95 12.13 12.90 14.63 15.06 14.91 14.78 14.72 14.59 14.66 14.84 15.04 18.04 20.06 24.15 26.17 28.84 32.29 344.`JZ 1 yi525.3D ZUO`J.8/ IU.G I 345.88 2083.54 2165.06 11.71 345.85 2180.00 2261.52 13.06 32.53 2275.28 2356.80 15.44 42.73 2370.79 2452.31 19.98 52.37 2464.95 2546.47 26.36 49.85 2560.03 2641.55 35.01 47.21 2652.45 2733.97 46.21 39.14 2746.30 2827.82 60.28 38.20 2840.12 2921.64 75.91 38.62 2933.23 3014.75 91.80 38.76 3026.83 3108.35 108.36 39.24 39.22 40.15 40.00 39.49 40.18 40.00 39.73 40.21 36.19 31.99 26.12 2020 12.94 10.05 4592.34 35.80 6.99 4688.49 39.68 4.99 4784.39 43.38 3.68 4880.69 46.09 3.09 4973.34 50.11 2.26 3119.99 3201.51 126.48 3189.73 3271.25 141.11 3248.51 3330.03 153.48 3340.24 3421.76 172.50 3431.80 3513.32 191.45 3525.41 3617.43 3711.88 3802.89 3896.53 3987.46 4075.45 4161.61 4246.57 4329.18 4407.42 4483.44 4555.22 4623.62 4685.48 5074.06 54.17 1.15 4747.29 5163.32 56.40 357.44 4798.13 5258.85 60.10 354.88 4848.40 5356.06 63.96 354.61 4893.98 Tie-In Survey 5452.19 67.83 355.86 4933.24 Top Whipstock (Blind) 5528.00 70.06 353.77 4960.47 Base Window (Blind) 5540.00 71.98 353.77 4964.37 Inc+Trend 5564.20 72.38 354.35 4971.78 5596.87 74.99 355.13 4980.96 SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) G0.80 30.41 31.81 34.38 40.13 49.50 62.79 79.16 97.97 117.57 137.43 158.21 181.03 199.52 215.25 239.56 263.67 I V.1/ 11.68 13.05 15.40 19.85 26.04 34.42 45.28 59.02 74.32 89.88 106.10 123.83 138.15 150.26 168.86 187.39 206.19 224.56 243.65 262.26 284.15 3606.93 210.66 288.15 266.01 3698.95 229.44 312.16 290.02 3793.40 248.95 337.03 314.89 3884.41 267.98 361.31 339.17 3978.05 290.33 389.11 366.95 4068.98 4156.97 4243.13 4328.09 4410.70 4488.94 4564.96 4636.74 4705.14 4767.00 4828.81 4879.65 4929.92 4975.50 5014.76 5041.99 5045.89 5053.30 5062.48 316.81 348.54 386.15 428.82 476.87 529.33 587.99 651.48 719.22 788.15 867.65 940.94 1021.79 1107.02 1194.22 1264.47 1275.71 1298.56 1329.69 420.49 398.21 310.17 456.20 433.40 341.45 496.63 472.56 378.64 540.81 514.18 420.99 589.59 559.21 468.79 642.44 701.27 764.84 832.61 901.56 981.06 1054.42 1135.64 1221.48 1309.21 1379.95 1391.30 1414.34 1445.69 I V.L/ 11.73 13.07 15.48 20.53 28.78 41.16 57.12 75.85 95.45 115.31 136.08 158.91 177.39 193.12 217.43 241.53 I.YY V.JJ J~:).70YV.J 1 1.05 0.21 5959847.82 0.71 0.01 5959849.17 1.61 2.02 5959851.54 5.24 2.28 5959856.04 12.25 2.71 5959862.34 22.57 2.26 5959870.86 34.81 2.22 5959881.91 47.65 1.77 5959895.83 59.89 0.37 5959911.32 72.23 0.21 5959927.06 85.22 0.80 5959943.47 99.59 111.28 121.32 136.98 152.39 1.81 5959961.41 0.60 5959975.90 0.47 5959988.15 0.14 5960006.99 0.15 5960025.75 168.07 183.53 199.47 215.07 232.19 249.73 266.92 282.74 295.21 304.87 607.66 521.06 312.64 661.44 579.58 318.73 719.77 642.97 323.51 782.46 710.62 327.51 846.75 779.49 330.71 921.27 858.96 989.69 932.30 1064.67 1013.32 1144.11 1098.80 1226.45 1186.23 1293.18 1256.68 1303.86 1267.96 1325.61 1290.87 1355.40 1322.09 W-204\W -204\W-204L1 \W -204L1 333.05 332.12 326.64 318.78 311.50 305.10 303.87 301.49 298.61 0.22 5960044.78 0.09 5960063.37 0.20 5960082.69 0.25 5960101.53 3.29 5960123.68 2.54 5960149.95 4.89 5960181.48 3.39 5960218.90 4.47 5960261.43 3.91 5960309.37 4.14 5960361.74 4.23 5960420.34 3.96 5960483.78 2.85 5960551.48 4.39 5960620.39 4.12 5960699.88 4.23 5960773.19 4.49 5960854.11 3.98 5960939.46 4.20 5961026.76 3.91 5961097.10 16.00 5961108.36 2.82 5961131.23 8.31 5961162.40 V IGVJV.Y I IY / V.LJJLYYYG YY IYJ.V~GVGJGJ 612049.99 N 70.29924854 W 149.09252649 612049.63 N 70.29925227 W 149.09252927 612050.50 N 70.29925869 W 149.09252195 612054.06 N 70.29927084 W 149.09249259 612060.98 N 70.29928776 W 149.09243578 612071.17 N 70.29931064 W 149.09235221 612083.25 N 70.29934033 W 149.09225310 612095.88 N 70.29937785 W 149.09214914 612107.89 N 70.29941966 W 149.09204997 612120.00 N 70.29946217 W 149.09195006 612132.74 N 70.29950647 W 149.091 612146.84 N 70.29955491 W 149.09172854 612158.32 N 70.29959403 W 149.09163387 612168.18 N 70.29962711 W 149.09155252 612183.55 N 70.29967793 W 149.09142577 612198.68 N 70.29972856 W 149.09130096 612214.08 N 70.29977992 W 149.09117397 612229.27 N 70.29983010 W 149.09104875 612244.92 N 70.29988225 W 149.09091967 612260.24 N 70.29993309 W 149.09079333 612277.03 N 70.29999290 W 149.09065469 612294.17 612310.90 612326.16 612338.00 612346.94 612353.93 612359.15 612362.98 612365.96 612368.14 612369.30 612367.27 612360.59 612351.45 612342.88 612335.42 612334.02 612331.30 612327.96 N 70.30006397 W 149.09051268 N 70.30014942 W 149.09037344 N 70.30025102 W 149.09024529 N 70.30036672 W 149.09014429 N 70.30049732 W 149.09006606 N 70.30064011 W 149.09000315 N 70.30079998 W 149.089 N 70.30097315 W 149.089 N 70.30115797 W 149.08988269 N 70.30134612 W 149.08985673 N 70.30156322 W 149.08983772 N 70.30176358 W 149.08984526 N 70.30198493 W 149.08988957 N 70.30221845 W 149.08995324 N 70.30245729 W 149.09001212 N 70.30264975 W 149.09006395 N 70.30268057 W 149.09007392 N 70.30274317 W 149.09009322 N 70.30282846 W 149.09011648 Generated 3/28/2007 10:56 AM Page 2 of 8 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft tt tt tt ft ft tt de 100 tt ttUS ftUS Last Inc+Trend MW D+IFR+MS DbZ6. / / 5660.76 5693.71 5724.35 5756.25 5788.40 5820.63 5852.28 5884.30 5916.02 5945.97 5979.67 6011.24 6043.95 6075.83 6107.75 6139.94 6171.43 6204.09 6235.52 6267.54 6299.02 6330.21 6362.64 6395.23 6426.77 6459.14 6490.68 6522.56 6555.01 6587.01 6618.42 6650.28 6681.60 6713.92 6745.04 /a.Va Joo.oa waoo.Jo 82.47 356.66 4993.78 87.05 357.45 4996.79 91.44 358.19 4997.19 91.65 358.94 4996.33 91.03 359.71 4995.58 90.79 359.14 4995.07 90.53 356.99 4994.71 90.94 357.23 4994.29 91.66 355.66 4993.57 91.49 352.88 4992.75 90.14 351.53 4992.27 91.49 354.72 4991.82 91.35 353.88 4991.01 90.62 354.27 4990.46 92.10 353.17 4989.71 92.10 353.19 94.86 353.12 93.62 353.53 92.38 351.99 90.80 351.72 90.04 350.11 89.60 350.58 89.43 350.34 89.22 350.62 89.98 350.86 89.94 351.41 90.01 352.13 90.01 351.30 89.87 352.24 89.50 351.81 88.60 351.62 88.43 351.93 89.21 351.12 92.89 351.80 92.89 352.58 6778.51 92.65 352.14 6809.99 92.48 352.82 6842.77 92.04 350.57 6875.06 92.14 350.51 6906.89 92.17 350.72 4988.53 4986.62 4984.20 4982.56 4981.67 4981.44 4981.54 4981.81 4982.19 4982.41 4982.44 4982.45 4982.44 4982.48 4982.65 4983.18 4984.00 4984.65 4984.05 4982.48 4980.87 4979.46 4978.17 4976.99 4975.79 ~VV7.~V IJVV.JJ IY/V./ 1 IJVJ.VV IJJJ.VG GJV.IJ ~/. ~/~/ ..••/vl I~v.cv v~~V~v.v• •~ •v.vv~v •~vv .. .~.........~......- 5075.30 1391.92 1508.23 1415.37 1384.47 294.14 13.90 5961224.70 612322.56 N 70.30299888 W 149.09015269 5078.31 1424.63 1541.03 1447.09 1417.23 292.45 14.10 5961257.43 612320.39 N 70.30308838 W 149.09016632 5078.71 1455.19 1571.66 1476.85 1447.84 291.29 14.53 5961288.02 612318.77 N 70.30317200 W 149.09017575 5077.85 1487.04 1603.55 1507.96 1479.72 290.49 2.44 5961319.88 612317.49 N 70.30325909 W 149.09018221 5077.10 1519.15 1635.69 1539.44 1511.86 290.11 3.07 5961352.00 612316.63 N 70.30334689 W 149.09018526 5076.59 1551.36 1667.92 1571.04 1544.08 289.79 1.92 5961384.21 612315.83 N 70.30343492 W 149.09018787 5076.23 1582.94 1699.57 1601.94 1575.71 288.72 6.84 5961415.82 612314.29 N 70.30352133 W 149.09019652 5075.81 1614.86 1731.58 1633.12 1607.69 287.11 1.48 5961447.77 612312.20 N 70.30360868 W 149.09020958 5075.09 1646.45 1763.30 1663.95 1639.34 285.14 5.44 5961479.38 612309.76 N 70.30369515 W 149.09022550 5074.27 1676.14 1793.23 1692.80 1669.12 282.15 9.30 5961509.12 612306.33 N 70.30377652 W 149.090249 0 2 5073.79 1709.39 1826.93 1724.99 1702.51 277.58 5.66 5961542.43 612301.26 N 70.30386772 W 149.090 5073.34 1740.61 1858.50 1755.33 1733.84 273.80 10.97 5961573.70 612297.02 N 70.30395333 W 149.09031729 5072.53 1773.05 1891.20 1786.98 1766.38 270.55 2.60 5961606.18 612293.29 N 70.30404222 W 149.09034359 5071.98 1804.65 1923.07 1817.84 1798.08 267.26 2.60 5961637.83 612289.52 N 70.30412884 W 149.09037023 5071.23 1836.27 1954.98 1848.72 1829.80 263.77 5.78 5961669.49 612285.56 N 70.30421549 W 149.09039849 5070.05 1868.09 1987.15 1879.80 1861.74 259.95 0.06 5961701.37 612281.26 N 70.30430275 W 149.09042942 5068.14 1899.18 2018.58 1910.21 1892.95 256.21 8.77 5961732.51 612277.05 N 70.30438800 W 149.09045976 5065.72 1931.42 2051.15 1941.77 1925.30 252.42 4.00 5961764.80 612272.79 N 70.30447637 W 149.09049041 5064.08 1962.44 2082.53 1972.15 1956.43 248.47 6.29 5961795.87 612268.37 N 70.30456143 W 149.09052244 5063.19 1993.99 2114.54 2003.02 1988.12 243.93 5.01 5961827.48 612263.36 N 70.30464799 W 149.09055916 5062.96 2024.92 2146.02 2033.29 2019.20 238.96 5.66 5961858.48 612257.93 N 70.30473291 W 149.09059941 5063.06 2055.52 2177.21 2063.23 2049.95 233.73 2.06 5961889.14 612252.24 N 70.30481691 W 149.09064178 5063.33 2087.34 2209.64 2094.41 2081.93 228.36 0.91 5961921.04 612246.39 N 70.30490428 W 149.09068530 i 5063.71 2119.32 2242.23 2125.79 2114.07 222.97 1.07 5961953.09 612240.52 N 70.30499208 W 149.09072895 5063.93 2150.30 2273.77 2156.23 2145.19 217.89 2.53 5961984.14 612234.98 N 70.30507712 W 149.09077005 5063.96 2182.14 2306.14 2187.56 2177.18 212.90 1.70 5962016.04 612229.52 N 70.30516449 W 149.09081045 5063.97 2213.22 2337.68 2218.20 2208.39 208.39 2.29 5962047.18 612224.54 N 70.30524977 W 149.09084702 5063.96 2244.63 2369.56 2249.19 2239.94 203.79 2.60 5962078.65 612219.48 N 70.30533596 W 149.0908 5064.00 2276.61 2402.01 2280.76 2272.05 199.15 2.93 5962110.69 612214.35 N 70.30542369 W 149.0909 5064.17 2308.17 2434.00 2311.96 2303.74 194.71 1.77 5962142.31 612209.44 N 70.30551027 W 149.09095779 5064.70 2339.11 2465.41 2342.55 2334.82 190.18 2.93 5962173.31 612204.46 N 70.30559517 W 149.09099444 5065.52 2370.50 2497.26 2373.61 2366.34 185.63 1.11 5962204.76 612199.43 N 70.30568128 W 149.09103134 5066.17 2401.33 2528.57 2404.14 2397.31 181.01 3.59 5962235.66 612194.35 N 70.30576589 W 149.09106872 5065.57 2433.14 2560.88 2435.65 2429.26 176.22 11.58 5962267.53 612189.08 N 70.30585318 W 149.09110758 5064.00 2463.81 2591.96 2466.06 2460.06 171.99 2.50 5962298.25 612184.40 N 70.30593730 W 149.09114178 5062.39 2496.81 2625.39 2498.81 2493.19 167.55 1.50 5962331.31 612179.46 N 70.30602782 W 149.09117778 5060.98 2527.87 2656.84 2529.65 2524.37 163.43 2.22 5962362.42 612174.88 N 70.30611300 W 149.09121111 5059.69 2560.13 2689.60 2561.70 2556.78 158.70 6.99 5962394.75 612169.67 N 70.30620154 W 149.09124943 5058.51 2591.81 2721.86 2593.15 2588.61 153.40 0.36 5962426.50 612163.89 N 70.30628849 W 149.09129239 5057.31 2623.04 2753.67 2624.18 2619.99 148.21 0.67 5962457.80 612158.24 N 70.30637423 W 149.09133440 SurveyEditor Ver SP 2.1 Bid( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 3 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft n n n de 100 ft ftUS ftUS 6938.59 6968.57 7000.03 7032.80 7063.29 7095.44 7127.45 7158.54 7190.56 7222.82 7254.37 7286.85 7319.22 7351.40 7382.62 7457.29 7489.06 7521.00 7542.48 7573.95 7605.41 7638.41 7669.14 7701.67 7734.36 7765.38 7798.18 7829.83 7850.68 7880.52 7910.70 7941.39 7971.35 8000.99 8031.07 8061.01 8090.82 8120.39 8151.47 8181.29 91.41 350.70 4974.80 92.76 350.78 4973.71 93.24 351.58 4972.06 93.20 352.10 4970.22 93.31 351.86 4968.49 93.10 352.08 4966.69 92.86 351.70 4965.03 92.62 351.30 4963.54 92.17 352.20 4962.21 91.93 349.75 4961.05 93.62 349.39 4959.52 93.79 350.09 4957.43 93.68 349.59 4955.32 93.44 349.67 4953.32 93.27 348.60 4951.49 91.82 92.55 91.42 91.28 91.14 348.49 4948.18 349.29 4946.96 349.10 4945.86 348.91 4945.35 348.43 4944.69 89.70 86.54 83.08 82.51 82.30 82.68 81.64 82.29 82.96 83.17 83.79 84.52 87.64 90.08 90.25 90.77 90.56 90.66 90.78 92.48 350.55 350.43 349.64 349.98 351.46 355.45 356.16 357.09 357.79 358.20 358.66 358.70 359.81 0.28 0.16 0.00 0.89 0.86 1.02 2.45 4944.46 4945.54 4948.32 4952.40 4956.72 5056.32 5055.23 5053.58 5051.74 5050.01 5048.21 5046.55 5045.06 5043.73 5042.57 5041.04 5038.95 5036.84 5034.84 5033.01 5029.70 5028.48 5027.38 5026.87 5026.21 5025.98 5027.06 5029.84 5033.92 5038.24 2654.16 2683.59 2714.49 2746.74 2776.76 2808.41 2839.92 2870.50 2902.02 2933.71 2964.54 2996.26 3027.89 3059.32 3089.76 3162.44 3193.41 3224.59 3245.55 3276.22 3306.99 3339.35 3369.34 3400.93 3432.76 2785.36 2815.32 2846.73 2879.45 2909.89 2941.99 2973.96 3005.01 3037.00 3069.24 3100.76 3133.17 3165.47 3197.59 3228.75 3303.35 3335.09 3367.01 3388.49 3419.95 3451.41 3484.39 3514.99 3547.26 3579.66 4960.78 5042.30 3463.20 3610.42 4965.25 5046.77 3495.53 3642.91 4969.67 5051.19 3526.75 3674.25 4972.35 5053.87 3547.38 3694.93 4975.95 5057.47 3576.94 3724.55 4979.38 5060.90 3606.88 4982.51 5064.03 3637.37 4984.55 5066.07 3667.24 4985.14 5066.66 3696.86 4985.06 5066.58 3726.93 4984.79 5066.31 3756.86 4984.44 5065.96 3786.66 4984.13 5065.65 3816.23 4983.74 5065.26 3847.30 4982.89 5064.41 3877.11 3754.53 3785.06 3814.95 3844.58 3874.66 2655.12 2651.26 143.10 2.40 2684.39 2680.83 138.27 4.51 2715.15 2711.87 133.46 2.96 2747.28 2744.26 128.81 1.59 2777.20 2774.40 124.57 0.86 2808.75 2840.19 2870.69 2902.16 2933.79 2964.58 2996.28 3027.89 3059.32 3089.78 3162.56 3193.60 3224.86 3245.88 3276.66 3307.53 3340.01 3370.11 3401.85 3433.81 3464.35 3496.76 3528.04 3548.70 3578.30 3608.27 3638.80 3668.68 3698.31 3728.39 2806.19 120.08 0.95 2837.83 115.57 1.40 2868.55 110.98 1.50 2900.21 106.39 3.14 2932.04 101.34 7.63 2963.04 2994.93 3026.72 3058.32 3088.92 3162.03 3193.18 3224.54 3245.62 3276.47 3307.40 3339.92 3370.06 3401.82 3433.80 3464.35 3496.75 3528.04 3548.70 3578.30 3608.27 3638.79 3668.68 3698.31 3728.39 95.63 89.86 84.16 78.38 72.50 57.69 51.57 45.59 41.49 35.31 29.57 24.12 18.83 13.12 7.90 4.39 2.01 0.17 -0.75 -1.79 -2.61 -3.32 -3.70 -3.68 -3.56 3904 .60 3758.33 3758.33 -3.52 3934. 41 3788.14 3788.13 -3.29 3963. 98 3817.70 3817.70 -2.84 3995 .05 3848.77 3848.77 -2.33 4024 .86 3878.57 3878.57 -1.43 5962488.98 5962518.47 5962549.44 5962581.75 5962611.83 5962643.54 5962675.11 5962705.75 5962737.34 5962769.09 5.48 5962799.99 2.21 5962831.79 1.58 5962863.50 0.79 5962895.00 3.46 5962925.51 1.95 5962998.38 3.41 5963029.44 3.59 5963060.70 1.10 5963081.71 1.59 5963112.46 8.15 5963143.30 9.58 5963175.74 11.55 5963205.79 2.04 5963237.46 4.53 5963269.36 12.81 5963299.85 3.83 5963332.21 3.56 5963363.46 4.63 5963384.10 1.53 5963413.68 2.55 5963443.64 2.38 5963474.14 11.05 5963504.01 8.38 5963533.64 0.69 5963563.71 1.82 5963593.65 3.07 5963623.45 0.35 5963653.02 0.64 5963684.09 7.45 5963713.89 612152.66 N 70.30645965 W 149.09137582 612147.40 N 70.30654043 W 149.09141487 612142.12 N 70.30662524 W 149.09145389 612136.99 N 70.30671372 W 149.09149150 612132.30 N 70.30679607 W 149.09152590 612127.34 N 70.30688290 W 149.09156222 612122.36 N 70.30696936 W 149.09159875 612117.31 N 70.30705327 W 149.09163593 612112.25 N 70.30713976 W 149.09167311 612106.72 N 70.30722674 W 149.09171408 612100.55 N 70.30731141 W 149.0917 612094.31 N 70.30739854 W 149.0918 612088.14 N 70.30748540 W 149.09185320 612081.88 N 70.30757171 W 149.09190004 612075.55 N 70.30765533 W 149.09194762 612059.65 N 70.30785505 W 149.09206763 612053.07 N 70.30794016 W 149.09211719 612046.62 N 70.30802581 W 149.09216566 612042.21 N 70.30808340 W 149.09219884 612035.57 N 70.30816768 W 149.09224891 612029.38 N 70.30825218 W 149.09229540 612023.44 N 70.30834103 W 149.09233954 612017.70 N 70.30842337 W 149.09238243 612011.52 N 70.30851014 W 149.09242868 612005.82 N 70.30859750 W 149.09247101 612001.86 N 70.30868096 W 149.09249940 611999.00 N 70.30876949 W 149.09251866 611996.69 N 70.30885495 W 149.09253361 611995.46 N 70.30891139 W 149.092 611993.98 N 70.30899226 W 149.0925 611992.71 N 70.30907414 W 149.09255614 611991.55 N 70.30915753 W 149.09256184 611990.72 N 70.30923917 W 149.09256498 611990.30 N 70.30932012 W 149.09256479 611989.97 N 70.30940229 W 149.09256385 611989.56 N 70.30948408 W 149.09256352 611989.35 N 70.30956551 W 149.09256164 611989.36 N 70.30964628 W 149.09255798 611989.41 N 70.30973117 W 149.09255385 611989.87 N 70.30981256 W 149.09254654 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 4 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de tt tt tt tt n n tt de 100 tt ttUS ftUS tSGI l.4`J YL.1/ J.V~ 8241.49 92.04 2.13 8271.63 90.83 2.30 8301.69 90.76 1.61 8331.86 90.53 1.56 8360.25 90.52 0.38 8390.41 92.34 0.07 8421.56 91.35 359.02 8451.43 91.24 358.47 8481.63 93.03 357.57 8511.85 92.93 357.41 8541.01 92.69 357.89 8571.89 92.79 357.50 8598.09 92.62 356.91 8634.27 92.38 357.93 8666.21 92.69 357.32 8698.28 93.00 356.74 8730.31 94.06 357.86 8763.75 93.34 356.80 8794.28 91.49 354.64 8823.97 8857.84 8888.47 8916.67 8948.92 8980.57 9011.98 9043.90 9076.36 9108.20 9140.07 9171.63 9203.50 9235.86 9267.39 9299.76 9331.30 9363.69 9395.72 9427.55 94.03 94.78 94.51 94.24 92.65 90.70 91.49 91.90 91.69 91.38 91.07 91.62 91.66 91.28 91.04 91.93 92.27 91.66 90.94 90.66 354.53 355.50 356.12 355.72 356.55 4~0 I .O / 4980.56 4979.81 4979.39 4979.05 4978.79 4978.04 4977.04 4976.36 4975.24 4973.66 4972.24 4970.76 4969.52 4967.94 4966.53 4964.94 4962.97 4960.81 4959.52 4958.09 4955.49 4953.01 4950.86 4948.92 vuvJ. I a 5062.08 5061.33 5060.91 5060.57 5060.31 5059.56 5058.56 5057.88 5056.76 5055.18 5053.76 5052.28 5051.04 5049.46 5048.05 5046.46 5044.49 5042.33 5041.04 5039.61 5037.01 5034.53 5032.38 5030.44 355.45 4948.00 5029.52 355.74 4947.40 5028.92 355.92 4946.45 5027.97 355.67 4945.44 5026.96 355.20 4944.58 5026.10 354.20 4943.90 5025.42 354.78 4943.16 5024.68 354.74 4942.25 5023.77 354.40 4941.42 5022.94 355.51 4940.78 5022.30 356.96 4939.94 5021.46 356.81 4938.79 5020.31 356.70 4937.68 5019.20 356.79 4936.95 5018.47 356.68 4936.50 5018.02 9459.45 90.18 356.10 4936.27 5017.79 JAV/.GO YVJJ. VY J.7VO.i I 3937.25 4085. 02 3938.65 3967.38 4115. 15 3968.76 3997.43 4145. 20 3998.80 4027.60 4175. 37 4028.96 4055.99 4203. 76 4057.34 4086.13 4233. 91 4087.49 4117.24 4265. 04 4118.62 4147.07 4294. 90 4148.48 4177.19 4325. 08 4178.64 4207.29 4236.35 4267.13 4293.22 4329.27 4355.26 4208.79 4384.39 4237.89 4415.23 4268.71 4441.40 4294.85 4477.55 4330.96 4361.11 4393.04 4424.92 4458.20 4488.54 4517.97 4551.52 4581.90 4609.88 4641.93 4673.41 4704.65 4736.40 4768.68 4800.32 4831.96 4863.27 4894.90 4927.01 4958.33 4990.55 5021.96 5054.22 5086.13 5117.84 5149.61 JJVV./ I 3938.65 3968.76 3998.80 4028.96 4057.34 4087.49 4118.62 4148.48 4178.64 4208.79 4237.89 4268.71 4294.85 4330.95 4509.46 4362.84 4362.84 4541.49 4394.83 4394.82 4573.45 4426.76 4426.76 4606.83 4460.10 4460.09 4637.33 4490.52 4490.50 4666.98 4700.75 4731.28 4759.40 4791.59 4823.22 4854.63 4886.53 4918.98 4950.81 4982.67 5014.22 5046.08 5078.43 5109.95 5142.31 5173.83 5206.20 5238.22 5270.05 4520.05 4553.70 4584.16 4612.21 4644.34 4675.91 4707.23 4739.07 4771.44 4803.19 4834.93 4866.36 4898.11 4930.34 4961.77 4994.08 5025.57 5057.90 5089.89 5121.69 4520.02 4553.67 4584.11 4612.16 4644.28 4675.84 4707.15 4738.97 4771.32 4803.05 4834.78 4866.18 4897.91 4930.11 4961.51 4993.80 5025.27 5057.59 5089.56 5121.34 5301.94 5153.54 5153.17 1.40 3.23 5963774.01 611991.79 N 70.30997672 W 149.09252366 2.56 4.05 5963804.13 611992.51 N 70.31005897 W 149.09251423 3.59 2.31 5963834.18 611993.08 N 70.31014104 W 149.09250592 4.42 0.78 5963864.34 611993.47 N 70.31022342 W 149.09249916 4.90 4.16 5963892.73 611993.53 N 70.31030096 W 149.09249527 5.02 6.12 5963922.87 611993.20 N 70.31038333 W 149.09249431 4.77 4.63 5963953.99 611992.48 N 70.31046838 W 149.09249631 4.12 1.88 5963983.83 611991.39 N 70.31054994 W 149.09250161 3.08 6.63 5964013.97 611989.89 N 70.31063233 W 149.09251005 1.75 0.62 5964044.10 611988.12 N 70.31071470 W 149.0925 0.56 1.84 5964073.17 611986.49 2 N 70.31079420 W 149.092 -0.68 1.30 5964103.97 611984.79 N 70.31087840 W 149.0925 -1.96 2.34 5964130.08 611983.13 N 70.31094981 W 149.09255083 -3.58 2.89 5964166.16 611980.96 N 70.31104845 W 149.09256401 -4.91 2.14 5964198.01 611979.17 N 70.31113555 W 149.09257472 -6.57 2.05 5964229.97 611977.03 N 70.31122294 W 149.09258817 -8.07 4.81 5964261.87 611975.05 N 70.31131017 W 149.09260037 -9.63 3.83 5964295.18 611973.00 N 70.31140124 W 149.09261297 -11.90 9.31 5964325.55 611970.27 N 70.31148433 W 149.09263142 -14.70 8.56 5964355.03 611967.03 N 70.31156498 W 149.09265409 -17.64 3.61 5964388.62 611963.59 N 70.31165688 W 149.09267787 -19.87 2.20 5964419.03 611960.91 N 70.31174006 W 149.09269594 -21.87 1.71 5964447.04 611958.49 N 70.31181669 W 149.09271215 -24.04 5.56 5964479.12 611955.84 N 70.31190443 W 149.09272973 -26.24 7.07 5964510.63 611953.17 N 70.31199064 W 149.09274761 -28.66 2.68 5964541.90 611950.29 N 70.31207618 W 149.09276716 -30.98 1.40 5964573.68 611947.49 N 70.31216311 W 149.09278596 -33.36 1.01 5964606.00 611944.63 N 70.31225151 W 149.09280524 -35.89 1.77 5964637.68 611941.63 N 70.31233819 W 149.0928 -38.83 3.28 5964669.36 611938.21 N 70.31242486 W 149.09284961 -41.86 2.53 5964700.71 611934.72 N 70.31251066 W 149.09287416 -44.77 0.18 5964732.39 611931.33 N 70.31259732 W 149.09289774 -47.83 1.58 5964764.54 611927.79 N 70.31268530 W 149.09292254 -50.60 3.60 5964795.89 611924.55 N 70.31277108 W 149.09294501 -52.73 5.25 5964828.14 611921.95 N 70.31285929 W 149.09296223 -54.44 1.18 5964859.58 611919.77 N 70.31294527 W 149.09297611 -56.27 1.91 5964891.87 611917.45 N 70.31303357 W 149.09299096 -58.09 2.27 5964923.80 611915.16 N 70.31312090 W 149.09300569 -59.90 0.95 5964955.54 611912.87 N 70.31320771 W 149.09302038 -61.91 2.36 5964987.34 611910.39 N 70.31329469 W 149.09303666 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/200710:56 AM Page 5 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de tt tt tt n tt ft n de 100 n nUS ftUS y4`JU.bU 9522.63 9554.44 9586.71 9618.28 9650.73 9687.12 9719.10 9751.03 9783.01 9814.17 9846.68 9878.76 9910.83 9943.83 9975.20 10001.09 10032.67 10071.13 10102.94 10135.46 10167.11 10198.79 10231.26 10262.98 10295.02 10327.33 10359.15 10390.53 10422.90 10454.74 10486.10 10519.62 10550.69 10581.78 10609.36 10641.83 10673.22 10705.41 10737.46 10768.66 `JU.46 30C.ZZ 4`J30. I V DU 1 /.OG 90.87 358.64 4935.72 5017.24 90.77 358.22 4935.27 5016.79 90.49 358.24 4934.91 5016.43 90.39 359.52 4934.67 5016.19 91.21 0.33 4934.22 5015.74 90.97 0.41 4933.53 5015.05 90.49 359.30 4933.12 5014.64 90.18 359.36 4932.93 5014.45 90.42 1.13 4932.76 5014.28 91.35 1.53 4932.28 5013.80 89.66 3.18 4932.00 5013.52 89.84 4.44 4932.14 5013.66 90.04 3.93 4932.17 5013.69 89.56 4.75 4932.29 5013.81 88.59 4.52 4932.79 5014.31 89.94 4.02 4933.12 5014.64 90.01 4.01 4933.14 5014.66 89.63 3.86 4933.26 5014.78 89.29 4.06 4933.56 5015.08 88.88 3.85 4934.08 5015.60 89.32 2.97 4934.58 5016.10 89.22 3.04 4934.98 5016.50 88.81 3.87 4935.54 5017.06 88.53 88.30 87.78 88.88 89.19 88.74 88.40 88.43 88.47 87.89 2.88 4936.27 5017.79 2.68 4937.16 5018.68 3.06 4938.26 5019.78 2.67 4939.19 5020.71 4.20 4939.72 5021.24 ~I8V.0/ OJJG.yy 5212.65 5365.12 5244.41 5396.93 5276.62 5429.20 5308.16 5460.77 5340.59 5493.21 5376.96 5529.60 5408.93 5561.57 5440.83 5593.50 5472.80 5503.96 5536.46 5568.52 5600.55 5625.48 5656.64 5689.14 5721.22 5753.29 5633.51 5664.83 5690.69 5722.24 5760.67 5792.45 5824.93 5856.56 5888.23 5920.68 5952.37 5984.39 6016.68 6048.47 6079.83 4.20 4940.30 5021.82 6112.16 4.12 4941.10 5022.62 6143.96 3.92 4941.97 5023.49 6175.28 4.46 4942.87 5024.39 6208.75 4.39 4943.86 5025.38 6239.76 88.77 88.81 88.98 88.95 88.74 88.33 88.19 4.34 4944.77 5026.29 6270.80 4.77 4945.35 5026.87 6298.34 6.27 4945.98 5027.50 6330.72 5.75 4946.54 5028.06 6362.01 6.31 4947.19 5028.71 6394.10 6.83 4948.01 5029.53 6426.02 6.89 4948.96 5030.48 6457.07 .7104..7/ .710Y. 10 5216.69 5216.30 5248.50 5248.09 5280.76 5280.34 5312.33 5311.91 5344.77 5344.35 5381.15 5380.74 5413.12 5412.71 5445.05 5444.64 5477.03 5476.62 5508.16 5507.76 5540.62 5540.24 5572.61 5572.25 5604.56 5604.24 5786.29 5637.44 5637.14 5817.66 5668.67 5668.40 5843.55 5694.47 5694.22 5875.13 5725.95 5725.72 5913.59 5764.30 5764.09 5945.40 5977.91 6009.56 6041.23 6073.70 6105.41 6137.44 6169.73 6201.54 6232.91 6265.28 6297.11 6328.45 6361.96 6393.02 5796.01 5828.43 5860.00 5891.63 5924.02 5955.66 5987.64 6019.88 6051.64 6082.95 6115.21 6146.95 6178.21 6211.62 6242.57 5795.82 5828.26 5859.85 5891.49 5923.89 5955.55 5987.54 6019.79 6051.55 6082.87 6115.15 6146.90 6178.17 6211.59 6242.55 6424.09 6451.67 6484.13 6515.52 6547.70 6579.74 6610.92 6273.55 6301.04 6333.34 6364.55 6396.55 6428.38 6459.34 6273.53 6301.02 6333.33 6364.54 6396.55 6428.38 6459.34 -OJ.YJ V.OA JJVJV IV.JG VI~.7VV.Jp ~v iv.v ~vv~a~v rr i~a.vavvtV~v -64.33 1.83 5965050.42 611907.03 N 70.31346714 W 149.09305626 -65.20 1.36 5965082.20 611905.68 N 70.31355400 W 149.09306332 -66.20 0.87 5965114.43 611904.21 N 70.31364211 W 149.09307140 -66.82 4.07 5965145.97 611903.12 N 70.31372834 W 149.09307641 -66.86 3.55 5965178.41 611902.59 N 70.31381698 W 149.09307675 -66.62 0.70 5965214.79 611902.29 N 70.31391637 W 149.09307485 -66.71 3.78 5965246.76 611901.73 N 70.31400373 W 149.09307551 -67.08 0.99 5965278.68 611900.88 N 70.31409095 W 149.09307854 -66.94 5.59 5965310.65 611900.54 N 70.31417831 W 149.09307743 -66.22 3.25 5965341.80 611900.80 N 70.31426340 W 149.0930 -64.88 7.26 5965374.29 611901.65 7 N 70.31435213 W 149.093 -62.75 3.97 5965406.33 611903.30 N 70.31443958 W 149.0930 -60.41 1.71 5965438.34 611905.16 N 70.31452696 W 149.09302451 -57.91 2.88 5965471.28 611907.17 N 70.31461685 W 149.09300428 -55.38 3.18 5965502.57 611909.24 N 70.31470226 W 149.09298374 -53.45 5.56 5965528.41 611910.78 N 70.31477278 W 149.09296812 -51.24 0.22 5965559.94 611912.52 N 70.31485885 W 149.09295020 -48.60 1.06 5965598.34 611914.59 N 70.31496367 W 149.09292882 -46.40 1.24 5965630.10 611916.31 N 70.31505036 W 149.09291101 -44.16 1.42 5965662.56 611918.07 N 70.31513898 W 149.09289284 -42.28 3.11 5965694.18 611919.48 N 70.31522528 W 149.09287759 -40.62 0.39 5965725.83 611920.67 N 70.31531170 W 149.09286413 -38.66 2.85 5965758.26 611922.14 N 70.31540023 W 149.09284828 -36.80 3.24 5965789.93 611923.54 N 70.31548671 W 149.09283315 -35.24 0.95 5965821.94 611924.61 N 70.31557410 W 149.09282056 -33.63 1.99 596585421 611925.75 N 70.31566221 W 149.09280746 -32.04 3.67 5965885.99 611926.87 N 70.31574899 W 149.09279458 -30.16 4.97 5965917.33 611928.28 N 70.31583455 W 149.09277934 7 -27.79 1.39 5965949.64 611930.17 N 70.31592273 W 149.092 -25.48 1.10 5965981.41 611932.00 N 70.31600946 W 149.09274142 -23.28 0.64 5966012.71 611933.73 N 70.31609489 W 149.09272361 -20.83 1.61 5966046.16 611935.68 N 70.31618619 W 149.09270377 -18.43 1.88 5966077.15 611937.62 N 70.31627077 W 149.09268435 -16.07 2.84 5966108.17 611939.52 N 70.31635542 W 149.09266518 -13.88 1.57 5966135.68 611941.30 N 70.31643051 W 149.09264743 -10.76 4.65 5966168.03 611943.94 N 70.31651879 W 149.09262213 -7.47 1.66 5966199.29 611946.76 N 70.31660406 W 149.09259549 -4.09 1.86 5966231.34 611949.66 N 70.31669149 W 149.09256809 -0.42 2.07 5966263.21 611952.85 N 70.31677845 W 149.09253838 3.30 0.49 5966294.23 611956.11 N 70.31686303 W 149.09250819 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 6 of 8 Comments Measured Inclination Azimuth Sub,Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt n n ft ft n n de 100 ft nUS ftUS 1 UBUU.'3b 10837.29 10868.87 10901.83 10933.06 10962.79 10995.74 11026.75 11057.87 11089.89 11122.08 11154.36 11186.80 11217.12 11248.36 11281.30 11313.84 11345.29 11377.44 11409.78 11441.13 11473.13 11505.02 11536.72 11564.16 11600.02 11632.31 11664.41 t3tS.UG 88.78 89.05 88.71 89.22 89.77 89.32 88.95 89.29 89.50 88.81 88.54 88.26 88.71 88.50 89.36 90.04 89.80 88.81 87.17 88.09 88.50 88.33 87.99 87.78 87.61 87.81 88.78 t7.J"L 4y5U.U3 SUSl.bO tJ4t5`J.L I b043.CV 5.59 4951.04 5032.56 6525.43 6679.52 5.40 4951.64 5033.16 6556.93 6711.10 4.89 4952.28 5033.80 6589.82 6744.05 3.21 4952.85 5034.37 6621.01 6775.27 3.13 4953.11 5034.63 6650.73 6805.00 3.06 4953.37 5034.89 6683.67 6837.95 2.47 4953.84 5035.36 6714.67 6868.96 1.55 4954.32 5035.84 6745.78 6900.07 1.20 4954.65 5036.17 6777.80 6932.09 2.10 4955.13 5036.65 6809.99 6964.28 1.37 4955.88 5037.40 6842.26 6996.55 1.55 4956.78 5038.30 6874.68 7028.98 359.97 359.05 359.72 359.72 359.22 359.85 0.68 o.s8 2.44 5.58 6.82 6.52 6.20 6.42 5.44 11694.83 89.29 6.67 11727.83 89.12 6.95 11758.50 87.54 6.54 11788.23 86.41 6.45 11819.16 86.68 7.89 4957.58 5039.10 6904.99 7059.29 4958.34 5039.86 6936.20 7090.52 4958.96 5040.48 6969.11 7123.45 4959.13 5040.65 7001.63 7155.99 4959.17 5040.69 7033.06 7187.44 4959.56 4960.70 4961.99 4962.95 4963.83 4964.85 4965.86 4967.30 4968.59 4969.55 4970.06 4970.52 4971.41 4972.98 4974.84 11851.30 86.40 7.42 4976.78 11882.79 86.03 7.37 4978.86 11917.57 86.83 8.50 4981.03 11949.35 89.97 9.09 4981.91 11981.70 90.15 8.84 4981.88 12013.53 90.08 9.90 4981.82 12040.78 89.84 9.84 4981.84 12078.12 89.46 10.04 4982.06 n4y 1.4V 6527.54 6558.97 6591.80 6622.95 6652.64 6685.55 6716.52 6747.62 6779.63 6811.81 6844.07 6876.49 6906.80 6938.02 6970.95 7003.49 7034.94 5041.08 7065.19 7219.59 7067.08 5042.22 7097.50 7251.91 7099.40 5043.51 7128.82 7283.23 7130.72 5044.47 7160.80 7315.22 7162.70 5045.35 7192.65 7347.09 7194.50 5046.37 5047.38 5048.82 5050.11 5051.07 5051.58 5052.04 5052.93 5054.50 5056.36 5058.30 5060.38 5062.55 5063.43 5063.40 5063.34 5063.36 5063.58 7224.23 7251.54 7287.24 7319.40 7351.39 7381.71 7414.57 7445.10 7474.68 7505.40 7537.30 7568.56 7603.05 7634.56 7666.64 7698.18 7725.14 7762.08 04~ I .4U 6527.53 6558.96 6591.78 6622.92 6652.61 6685.51 6716.48 6747.58 6779.58 6811.76 6844.01 6876.43 6906.74 6937.96 6970.90 7003.44 7034.88 7067.03 7099.35 7130.67 7162.64 7194.43 7378.78 7226.02 7225.93 7406.20 7253.27 7253.17 7442.03 7288.90 7288.78 7474.29 7320.99 7320.85 7506.38 7352.92 7352.76 / . V I 1 .04 .7.700JLO.JJ 10.78 2.90 5966362.51 13.80 1.05 5966393.98 16.76 1.86 5966426.84 18.97 5.62 5966458.01 20.61 1.87 5966487.71 22.39 1.38 5966520.63 23.88 2.25 5966551.62 24.98 3.15 5966582.73 25.74 1.27 5966614.74 26.67 3.52 5966646.92 27.65 2.41 5966679.18 28.47 1.03 5966711.61 28.88 28.61 28.26 28.10 27.81 5.42 5966741.91 3.02 5966773.13 3.31 5966806.05 2.09 5966838.58 1.76 5966870.02 27.54 27.69 28.12 29.05 31.28 34.70 37.88 41.85 45.40 48.71 7536.80 7383.19 7383.01 51.92 7569.79 7415.98 7415.77 55.83 7600.45 7446.45 7446.21 59.43 7630.14 7475.98 7475.71 62.79 7661.01 7506.64 7506.34 66.65 7693.09 7538.47 7538.14 70.92 7724.51 7569.67 7569.30 74.96 7759.22 7604.10 7603.68 79.76 7790.99 7635.54 7635.07 84.61 7823.34 7667.55 7667.02 89.65 7855.17 7699.01 7698.43 94.84 7882.42 7725.92 7725.27 99.51 7919.76 7762.78 7762.05 105.95 3.65 5966902.16 5.68 5966934.47 3.00 5966965.79 5.04 5966997.77 9.86 5967029.59 4.05 5967061.13 1.33 5967088.41 1.01 5967124.07 0.92 5967156.19 4.29 5967188.15 4.38 5967218.43 0.99 5967251.25 5.32 5967281.74 3.81 5967311.28 4.73 5967341.96 1.70 5967373.82 1.19 5967405.03 3.98 5967439.47 10.05 5967470.93 0.95 5967502.95 3.34 5967534.43 0.91 5967561.34 1.15 5967598.21 V 1 1 .~:7.7.JJ IV / V.J I V.7VVV 1 YY I YJ.VJGY/ V 1 1 611962.58 N 70.31704932 W 149.09244756 611965.13 N 70.31713518 W 149.09242306 611967.60 N 70.31722484 W 149.09239911 611969.34 N 70.31730993 W 149.09238123 611970.54 N 70.31739102 W 149.09236791 611971.83 N 70.31748090 W 149.09235349 611972.86 N 70.31756551 W 149.09234136 611973.49 N 70.31765047 W 149.09233252 611973.78 N 70.31773791 W 149.09232629 611974.23 N 70.31782580 W 149.09231878 611974.72 N 70.31791393 W 149.0923 611975.06 N 70.31800248 W 149.0923 611975.01 N 70.31808528 W 149.09230090 611974.28 N 70.31817059 W 149.09230306 611973.44 N 70.31826056 W 149.09230592 611972.79 N 70.31834945 W 149.09230721 611972.03 N 70.31843537 W 149.09230957 611971.29 N 70.31852319 W 149.09231168 611970.96 N 70.31861148 W 149.09231047 611970.92 N 70.31869704 W 149.09230701 611971.37 N 70.31878439 W 149.09229950 611973.12 N 70.31887125 W 149.09228143 611976.08 611978.85 611982.29 611985.36 611988.20 611990.95 611994.38 611997.52 612000.44 612003.84 612007.64 612011.21 612015.49 612019.88 612024.44 612029.16 612033.43 612039.32 N 70.31895730 W 149.09225370 N 70.31903171 W 149.09222788 N 70.31912899 W 149.09219570 N 70.31921660 W 149.09216696 N 70.31930378 W 149.09214009 N 70.31938641 W 149.0921 N 70.31947592 W 149.0920 N 70.31955909 W 149.09205317 N 70.31963968 W 149.09202595 N 70.31972336 W 149.09199471 N 70.31981022 W 149.09196007 N 70.31989535 W 149.09192729 N 70.31998927 W 149.09188844 N 70.32007502 W 149.09184907 N 70.32016232 W 149.09180820 N 70.32024811 W 149.09176619 N 70.32032146 W 149.09172832 N 70.32042193 W 149.09167607 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 7 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft n n ft n de 00 ft ftUS ttUS 121 Ut3.ttU tSy.tf/ `J.`J4 4FltSL.Z4 C)Ub3./b //yZ.43 /`JDV.44 //a3.UO /iyc.u i i i.ci I.~o Jav/vco.Jv 12140.99 91.01 9.38 4982.00 5063.52 7824.29 7982.63 7824.87 7824.00 116.68 3.95 5967660.30 12173.30 92.48 9.39 4981.01 5062.53 7856.28 8014.92 7856.81 7855.86 121.94 4.55 5967692.24 12204.36 92.34 10.22 4979.71 5061.23 7887.00 8045.95 7887.47 7886.44 127.23 2.71 5967722.89 12236.96 92.31 10.01 4978.38 5059.90 7919.21 8078.52 7919.62 7918.51 132.95 0.65 5967755.03 12268.77 91.86 9.53 4977.23 5058.75 7950.67 8110.31 7951.04 7949.83 138.34 2.07 5967786.44 12300.53 91.66 8.54 4976.25 5057.77 7982.14 8142.06 7982.47 7981.19 143.33 3.18 5967817.85 12332.96 91.35 7.71 4975.40 5056.92 8014.35 8174.48 8014.64 8013.28 147.91 2.73 5967850.01 12365.50 90.52 9.05 4974.87 5056.39 8046.65 8207.01 8046.91 8045.47 152.65 4.84 5967882.26 12396.51 91.80 9.88 4974.24 5055.76 8077.36 8238.02 8077.59 8076.05 157.75 4.92 5967912.91 12429.37 92.17 10.17 4973.10 5054.62 8109.84 8270.86 8110.03 8108.39 163.46 1.43 5967945.33 12460.73 91.97 10.84 4971.97 5053.49 8140.80 8302.20 8140.96 8139.20 169.18 2.23 5967976.22 12492.13 91.86 10.62 4970.92 5052.44 8171.78 8333.58 8171.91 8170.03 175.02 0.78 5968007.14 12524.32 92.10 10.36 4969.81 5051.33 8203.56 8365.75 8203.66 8201.67 180.88 1.10 5968038.85 12555.37 91.69 10.52 4968.78 5050.30 8234.22 8396.78 8234.30 8232.19 186.50 1.42 5968069.45 12586.75 90.70 9.97 4968.13 5049.65 8265.23 8428.15 8265.29 8263.06 192.08 3.61 5968100.40 12619.80 89.98 9.51 4967.93 5049.45 8297.94 8461.20 8297.98 8295.63 197.67 2.59 5968133.05 12649.19 90.08 9.79 4967.92 5049.44 8327.04 8490.59 8327.07 8324.60 202.60 1.01 5968162.09 Last MWD+IFR+MS 12673.82 89.91 9.27 4967.92 5049.44 8351.43 8515.22 8351.45 8348.89 206.68 2.22 5968186.44 TD (Projected) 12730.00 89.20 9.27 4968.35 5049.87 8407.10 8571.40 8407.11 8404.34 215.73 1.26 5968242.00 Survey Type: Definitive Survey NOTES: GYD CT DMS - ( Gyrodata - cont. drillpipe m/s -- Gyrodata pump-down multishot s urveys with continuous tool (RGS-CT) in drill-pipe.) Inc + Trend - (Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience enables directio n of drift to be predicted. Replaces ex-BP "I nclinometer (azimuth in known quadrant)" model.) MWD +IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correcti on is applied to enhance inclination accuracy. ) Leaal Descriation: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 4859 FSL 1177 FEL S21 T11 N R12E U M 5959836.12 6 12049.12 BHL : 2703 FSL 942 FEL S9 T11 N R12E UM 5968242.00 6 12139.50 V IGVYY. 1.7 IV /V.JLVJVYY/ YY IYJ.VJIVJGJJ 612049.12 N 70.32059116 W 149.09158914 612053.91 N 70.32067821 W 149.09154645 612058.74 N 70.32076175 W 149.09150360 612063.98 N 70.32084935 W 149.09145722 612068.91 N 70.32093493 W 149.09141349 612073.42 N 70.32102058 W 149.09137307 612077.52 N 70.32110826 W 149.09133593 612081.79 N 70.32119619 W 149.09129748 612086.43 N 70.32127973 W 149.09125615 612091.66 N 70.32136808 W 149.09120 0 612096.91 N 70.32145226 W 149.0911 612102.30 N 70.32153650 W 149.09111611 612107.68 N 70.32162292 W 149.09106862 612112.85 N 70.32170629 W 149.09102303 612117.97 N 70.32179063 W 149.09097778 612123.07 N 70.32187962 W 149.09093245 612127.56 N 70.32195877 W 149.09089251 612131.28 N 70.32202513 W 149.09085944 612139.50 N 70.32217660 W 149.09078607 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L1\W-204L1 Generated 3/28/2007 10:56 AM Page 8 of 8 1I TREE= FMC4-1/8"5M WELLHEAD = FMC GEN 5 ACTUATOR = Hydraulic KB. ELEV = 81.52' BF. ELEV = 53.69' KOP = 2357' Max Angle=L1 100 @ 6899 Datum MD = xxxx' Datum TV D = xxxx' SS I As-Drilled Completion W-204 W-204 L1 W-204 L2 zzo5• 10 3/4" CSG., 45.5# L-80, .0962 bpf, ID= 9.95" 3338' 4.5"Phoenix Discharge Pressure sub, ID = 3.948" 5211' ~ 4.5" Phoenix CST-1 Jet Purrs Gauge, ID = 3.994" 5243' RA TAG 5317' ~ Seal Bore Extension, ID = 5.75" 5326'ti533T 7-5/8" x 5.5" BKR ZXP PACKER, ID = 4.82^ 5337' L2 BKR HUGHES HOOK HGR, ID = 5.62" 5361' Minimum ID = 3.688" @ 5363', & 5525' - LEM's Seal Bore Extension, ID = 5.75" 5468'-5479' 7-5l8" x 5.5" BKR ZXP PACKER, ID = 4.82" 5479' Seal Assembly from LEM#2 5496' L2 BKR HUGHES HOOK HGR, ID = 5.62" 5523' RA TAG 5479' ~ RA TAG ~-) 5561' Seal Bore Extension, O = 5.75" 5607'-5618' 7-518" x 5.5" BKR ZXP PACKER, ID = 4.82" 5618' 7 5!8" x 5.5" BKR HMC Liner Hanger ID= 4.80" 5624' Seal Assembly from LEM#1 5639' 7 5/8" CSG, 29.7# L-80 BTC, .0459 bpf, ID=6.875 H 5847' ~e..u 4.5" 12.6# L-80 BTC Slotted (3.958" ID) 5866'-7414' 4.5" x 6.4" Swell Packer 3.9" O - OBd 7424'-7444' 4.5" x 6.4" Swell Packer 3.9" ID - OBd 8005'-8024' 4.5" 12.6# L-80 BTC Slotted (3.958" ID) 8034'-9680' 4.5" x 6.4" Swell Packer 3.9" ID - OBd 9690'-9710' 4.5" x 6.4" Swell Packer 3.9" O - OBd 10105'-10125' 4.5" 12.6# L-80 BTC Slotted (3.958" ID) 10135'-12628' 4.5" 12.6# L-80 BTGSlotted xIBT-Solid Liner Shoe - (PBTD 12628') OBd W-204 12628' DRLG DRAFT DES X NIP, ~ = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 2519 2518 6 KBG-2 DMY SBK-2 1" 02/28/07 3 3509 3484 15 KBG-2 DMY SBK-2 1" 02/28/07 2 4865 4694 46 KBG-2 DMY SBK-2 1" 02/28/07 1 5102 4845 55 KBG-2 DCK BEK 1" 02/28/07 5221' 4.5" Baker CMD-BX Sliding Sleeve, 3.812" 10 5266' 7.625" x 4.5" Prerrmer Packer 3.87" ID 5292' 4.5" HES X nipple W/ RHGM Plug, ID 3.813" 5313' 4.5" HES X nipple, ID 3.813" 5341' 4.5" Half Muleshoe stung into linertop packer, ID 3.958" 5378'-5384' Hook Hanger below window - 3.99" ID 5430'-5450' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa 6302'-6322' 4.5" x 6.4" Swell Packer 3.9" IQL2-OBa 6332'-7369' 4.5" L-80 12.6# IBT Slotted Liner 3.958" ID L2-OBa 7389'-7408' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa 7881'-7901' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa 7913'-10399' 4.5" L-80 12.6# IBT Slotted Liner 3.958" ID L2-OBa 10401'-10524' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L2-OBa 10535'-10554' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa 10987'-11007' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa 11017'-12716' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L2-OBa 12758, 4.5" 12.6# L-80 BTClIBT-Slotted xIBT-Solid Liner Shoe - (PBTD 12,758') L2-OBa W-204 5540'-5547' Hook Hanger below window - 3.99" ID 5575'-5594' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc 6015'-7410' 4.5" L-80 12.6# BTC Slotted liner 3.958" ID L1-OBc 7421'-7440' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc 7795'-7814' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc 7824'-10389' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L1-OBc 10399'-10418' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc 10774'-10793' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc 10803'-12656' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L1-OBc 4.5" 12.6# L-80 BTGSlotted xIBT-Solid Liner Shoe - 12702, (PBTD 12,702') L1-OBc W-204 DATE REV BY COMMENTS DATE REV BY COMMENTS POLARIS UNff 03/02/07 MJM Original Completion (from drilling) WELL: W-204, L1, L2 PERMfr No: 206-158, 159, 160 API No: 50-029-23333 SEC 21, T11N, R12E, 4,859' FSL 8,1,176' FEL BP Exploration (Alaska) G "1 ~,o SCHLUMBERGER Survey report Client ...................: Field ....................: Well .....................: API number ...............: Engineer .................. RIG :.....................: STATE :...................: ----- Survey calculation m Method for positions.....: Method for DLS...........: BP Exploration (Alaska) Inc. Polaris W-204L1 50-029-23333-60 F.Medina Nabors-7ES Alaska ethods------------- Minimum curvature Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 52.60 ft KB above permanent.......: NA Top Drive DF above permanent.......: 81.52 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 1.55 degrees 8-Feb-2007 12:25:31 Page 1 of 9 Spud date ................: 04-Jan-07 Last survey date.........: 08-Feb-07 Total accepted surveys...: 229 MD of first survey.......: 5452.19 ft MD of last survey........: 12730.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2006 Magnetic date ............: 02-Feb-2007 Magnetic field strength..: 57638.31 LAMA Magnetic dec (+E/W-).....: 23.87 degrees Magnetic dip .............: 80.89 degrees ----- MWD survey Reference Reference G ..............: Reference H ..............: Reference Dip ............: Tolerance of G...........: Tolerance of H...........: Tolerance of Dip.........: Criteria --------- 1002.68 meal 57638.50 LAMA 80.89 degrees (+/-) 2.50 meal (+/-)300.00 LAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.88 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.88 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction i SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 2 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD ----- Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 5452 19 67 83 355 86 0.00 5014.75 1194.21 1186.22 311.51 1226.44 14.71 0.00 TIP None 2 5528.00 70.06 353.77 75.81 5041.99 1264.46 1256.67 305.11 1293.18 13.65 3.91 BP _MWD+IFR+MS 3 5540.00 71.98 353.77 12.00 5045.69 1275.70 1267.95 303.88 1303.85 13.48 16.00 BP _BLIND 4 5564.20 72.38 354.35 24.20 5053.30 1298.55 1290.66 301.49 1325.60 13.15 2.82 BP _INC+TREND 5 5596.87 74.99 355.13 32.67 5062.47 1329.68 1322.08 298.62 1355.39 12.73 8.31 BP _INC+TREND 6 5628.77 78.09 355.89 31.90 5069.90 1360.53 1353.01 296.19 1385.05 12.35 9.99 BP _INC+TREND 7 5660.76 82.47 356.66 31.99 5075.30 1391.91 1384.46 294.15 1415.37 11.99 13.90 BP _INC+TREND 8 5693.71 87.05 357.45 32.95 5078.30 1424.62 1417.22 292.46 1447.09 11.66 14.10 BP _INC+TREND 9 5724.35 91.44 358.19 30.64 5078.71 1455.18 1447.83 291.30 1476.85 11.38 14.53 BP _INC+TREND 10 5756.25 91.65 358.94 31.90 5077.85 1487.03 1479.71 290.50 1507.96 11.11 2.44 BP _INC+TREND 11 5788.40 91.03 359.71 32.15 5077.10 1519.14 1511.85 290.12 1539.43 10.86 3.07 BP _MWD 12 5820.63 90.79 359.14 32.23 5076.58 1551.35 1544.07 289.80 1571.03 10.63 1.92 BP _MWD 13 5852.28 90.53 356.99 31.65 5076.22 1582.93 1575.70 288.73 1601.94 10.38 6.84 BP _MWD+IFR+MS 14 5884.30 90.94 357.23 32.02 5075.81 1614.86 1607.68 287.11 1633.11 10.13 1.48 BP _MWD+IFR+MS 15 5916.02 91.66 355.66 31.72 5075.09 1646.44 1639.33 285.15 1663.94 9.87 5.44 BP _MWD+IFR+MS 16 5945.97 91.49 352.88 29.95 5074.27 1676.14 1669.11 282.16 1692.79 9.59 9.30 BP _MWD+IFR+MS 17 5979.67 90.14 351.53 33.70 5073.79 1709.38 1702.50 277.59 1724.98 9.26 5.66 BP _MWD+IFR+MS 18 6011.24 91.49 354.72 31.57 5073.34 1740.60 1733.83 273.81 1755.32 8.97 10.97 BP _MWD+IFR+MS 19 6043.95 91.35 353.88 32.71 5072.53 1773.04 1766.37 270.56 1786.97 8.71 2.60 BP _MWD+IFR+MS 20 6075.83 90.62 354.27 31.88 5071.98 1804.65 1798.07 267.27 1817.83 8.45 2.60 BP _MWD+IFR+MS 21 6107.75 92.10 353.17 31.92 5071.22 1836.26 1829.79 263.78 1848.71 8.20 5.78 BP _MWD+IFR+MS 22 6139.94 92.10 353.19 32.19 5070.04 1868.08 1861.73 259.96 1879.80 7.95 0.06 BP _MWD+IFR+MS 23 6171.43 94.86 353.12 31.49 5068.13 1899.18 1892.94 256.22 1910.20 7.71 8.77 BP _MWD+IFR+MS 24 6204.09 93.62 353.53 32.66 5065.72 1931.41 1925.29 252.43 1941.77 7.47 4.00 BP _MWD+IFR+MS 25 6235.52 92.38 351.99 31.43 5064.07 1962.43 1956.42 248.47 1972.14 7.24 6..29 BP _MWD+IFR+MS 26 6267.54 90.80 351.72 32.02 5063.18 1993.98 1988.11 243.94 2003.02 7.00 5.01 BP _MWD+IFR+MS 27 6299.02 90.04 350.11 31.48 5062.95 2024.91 2019.19 238.97 2033.28 6.75 5.66 BP _MWD+IFR+MS 28 6330.21 89.60 350.58 31.19 5063.05 2055.51 2049.94 233.74 2063.22 6.50 2.06 BP _MWD+IFR+MS 29 6362.64 89.43 350.34 32.43 5063.32 2087.33 2081.92 228.36 2094.41 6.26 0.91 BP _MWD+IFR+MS 30 6395.23 89.22 350.62 32.59 5063.71 2119.31 2114.06 222.97 2125.78 6.02 1.07 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 3 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg) 31 6426.77 ___--- 89.98 350.86 ------ 31.54 ---- 5063.93 2150.29 2145.18 217.90 2156.22 5.80 2.53 BP _MWD+IFR+MS 32 6459.14 89.94 351.41 32.37 5063.95 2182.13 2177.17 212.91 2187.55 5.59 1.70 BP _MWD+IFR+MS 33 6490.68 90.01 352.13 31.54 5063.96 2213.21 2208.38 208.39 2218.19 5.39 2.29 BP _MWD+IFR+MS 34 6522.56 90.01 351.30 31.88 5063.96 2244.62 2239.93 203.80 2249.16 5.20 2.60 BP _MWD+IFR+MS 35 6555.01 89.87 352.24 32.45 5063.99 2276.60 2272.05 199.16 2280.76 5.01 2.93 BP _MWD+IFR+MS 36 6587.01 89.50 351.81 32.00 5064.17 2308.16 2303.74 194.72 2311.95 4.83 1.77 BP _MWD+IFR+MS 37 6618.42 88.60 351.62 31.41 5064.69 2339.10 2334.81 190.19 2342.55 4.66 2.93 BP _MWD+IFR+MS 38 6650.28 88.43 351.93 31.86 5065.52 2370.49 2366.33 185.63 2373.60 4.49 l.ll BP _MWD+IFR+MS 39 6681.60 89.21 351.12 31.32 5066.16 2401.32 2397.31 181.02 2404.13 4.32 3.59 BP _MWD+IFR+MS 40 6713.92 92.89 351.80 32.32 5065.57 2433.13 2429.26 176.22 2435.64 4.15 11.58 BP _MWD+IFR+MS 41 6745.04 92.89 352.58 31.12 5064.00 2463.80 2460.05 172.00 2466.05 4.00 2.50 BP _MWD+IFR+MS 42 6778.51 92.65 352.14 33.47 5062.38 2496.80 2493.18 167.55 2498.81 3.84 1.50 BP _MWD+IFR+MS 43 6809.99 92.48 352.82 31.48 5060.97 2527.86 2524.36 163.44 2529.65 3.70 2.22 BP _MWD+IFR+MS 44 6842.77 92.04 350.57 32.78 5059.68 2560.13 2556.77 158.71 2561.69 3.55 6.99 BP _MWD+IFR+MS 45 6875.06 92.14 350.51 32.29 5058.50 2591.80 2588.60 153.40 2593.14 3.39 0.36 BP _MWD+IFR+MS 46 6906.89 92.17 350.72 31.83 5057.31 2623.03 2619.98 148.22 2624.17 3.24 0.67 BP _MWD+IFR+MS 47 6938.59 91.41 350.70 31.70 5056.32 2654.15 2651.25 143.10 2655.11 3.09 2.40 BP _MWD+IFR+MS 48 6968.57 92.76 350.78 29.98 5055.22 2683.58 2680.82 138.28 2684.38 2.95 4.51 BP _MWD+IFR+MS 49 7000.03 93.24 351.58 31.46 5053.58 2714.48 2711.86 133.46 2715.14 2.82 2.96 BP _MWD+IFR+MS 50 7032.80 93.20 352.10 32.77 5051.74 2746.73 2744.25 128.82 2747.27 2.69 1.59 BP _MWD+IFR+MS 51 7063.29 93.31 351.86 30.49 5050.01 2776.75 2774.39 124.57 2777.19 2.57 0.86 BP _MWD+IFR+MS 52 7095.44 93.10 352.08 32.15 5048.21 2808.40 2806.18 120.09 2808.75 2.45 0.95 BP _MWD+IFR+MS 53 7127.45 92.86 351.70 32.01 5046.54 2839.91 2837.82 115.58 2840.18 2.33 1.40 BP _MWD+IFR+MS 54 7158.54 92.62 351.30 31.09 5045.06 2870.49 2868.54 110.99 2870.68 2.22 1.50 BP _MWD+IFR+MS 55 7190.56 92.17 352.20 32.02 5043.72 2902.02 2900.20 106.40 2902.15 2.10 3.14 BP _MWD+IFR+MS 56 7222.82 91.93 349.75 32.26 5042.57 2933.70 2932.04 101.34 2933.79 1.98 7.63 BP _MWD+IFR+MS 57 7254.37 93.62 349.39 31.55 5041.04 2964.53 2963.03 95.64 2964.57 1.85 5.48 BP _MWD+IFR+MS 58 7286.85 93.79 350.09 32.48 5038.94 2996.26 2994.92 89.86 2996.27 1.72 2.21 BP _MWD+IFR+MS 59 7319.22 93.68 349.59 32.37 5036.83 3027.89 3026.72 84.17 3027.89 1.59 1.58 BP _MWD+IFR+MS 60 7351.40 93.44 349.67 32.18 5034.83 3059.31 3058.31 78.38 3059.31 1.47 0.79 BP _MWD+IFR+MS • SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 4 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (f t) (ft) (ft) (deg) 100f) type (deg) 61 7382 62 93 27 348 60 31 22 5033.01 3089.75 3088.92 72.51 3089.77 1.34 3.46 BP_ MWD+IFR+MS 62 7457.29 91.82 348.49 74.67 5029.69 3162.43 3162.03 57.70 3162.55 1.05 1.95 BP_ MWD+IFR+MS 63 7489.06 92.55 349.29 31.77 5028.48 3193.40 3193.18 51.58 3193.59 0.93 3.41 BP_ MWD+IFR+MS 64 7521.00 91.42 349.10 31.94 5027.37 3224.58 3224.53 45.59 3224.85 0.81 3.59 BP_ MWD+IFR+MS 65 7542.48 91.28 348.91 21.48 5026.87 3245.55 3245.61 41.50 3245.88 0.73 1.10 BP_ MWD+IFR+MS 66 7573.95 91.14 348.43 31.47 5026.20 3276.22 3276.46 35.32 3276.65 0.62 1.59 BP_ MWD+IFR+MS 67 7605.41 89.70 350.55 31.46 5025.97 3306.98 3307.39 29.58 3307.52 0.51 8.15 BP_ MWD+IFR+MS 68 7638.41 86.54 350.43 33.00 5027.05 3339.34 3339.91 24.13 3340.00 0.41 9.58 BP_ MWD+IFR+MS 69 7669.14 83.08 349.64 30.73 5029.83 3369.33 3370.05 18.84 3370.10 0.32 11.55 BP_ MWD+IFR+MS 70 7701.67 82.51 349.98 32.53 5033.91 3400.93 3401.82 13.13 3401.84 0.22 2.04 BP_ MWD+IFR+MS 71 7734.36 82.30 351.46 32.69 5038.23 3432.75 3433.79 7.90 3433.80 0.13 4.53 BP_ MWD+IFR+MS 72 7765.38 82.68. 355.45 31.02 5042.29 3463.19 3464.34 4.40 3464.34 0.07 12.81 BP_ MWD+IFR+MS 73 7798.18 81.64 356.16 32.80 5046.76 3495.52 3496.75 2.02 3496.75 0.03 3.83 BP_ MWD+IFR+MS 74 7829.83 82.29 357.09 31.65 5051.19 3526.74 3528.03 0.18 3528.03 0.00 3.56 BP_ MWD+IFR+MS 75 7850.68 82.96 357.79 20.85 5053.86 3547.37 3548.69 -0.75 3548.69 359.99 4.63 BP_ MWD+IFR+MS 76 7880.52 83.17 358.20 29.84 5057.47 3576.93 3578.29 -1.78 3578.29 359.97 1.53 BP_ MWD+IFR+MS 77 7910.70 83.79 358.66 30.18 5060.89 3606.87 3608.26 -2.61 3608.27 359.96 2.55 BP_ MWD+IFR+MS 78 7941.39 84.52 358.70 30.69 5064.02 3637.37 3638.79 -3.31 3638.79 359.95 2.38 BP_ MWD+IFR+MS 79 7971.35 87.64 359.81 29.96 5066.07 3667.23 3668.67 -3.70 3668.67 359.94 11.05 BP_ MWD+IFR+MS 80 8000.99 90.08 0.28 29.64 5066.66 3696.85 3698.30 -3.67 3698.30 359.94 8.38 BP_ MWD+IFR+MS 81 8031.07 90.25 0.16 30.08 5066.57 3726.92 3728.38 -3.56 3728.38 359.95 0.69 BP_ MWD+IFR+MS 82 8061.01 90.77 360.00 29.94 5066.30 3756.85 3758.32 -3.52 3758.32 359.95 1.82 BP_ MWD+IFR+MS 83 8090.82 90.56 0.89 29.8.1 5065.96 3786.65 3788.13 -3.28 3788.13 359.95 3.07 BP_ MWD+IFR+MS 84 8120.39 90.66 0.86 29.57 5065.64 3816.22 3817.69 -2.83 3817.69 359.96 0.35 BP_ MWD+IFR+MS 85 8151.47 90.78 1.02 31.08 5065.25 3847.29 3848.75 -2.32 3848.77 359.97 0.64 BP_ MWD+IFR+MS 86 8181.29 92.48 2.45 29.82 5064.40 3877.10 3878.56 -1.42 3878.56 359.98 7.45 BP_ MWD+IFR+MS 87 8211.49 92.17 3.09 30.20 5063.18 3907.27 3908.70 0.04 3908.70 0.00 2.35 BP_ MWD+IFR+MS 88 8241.49 92.04 2.13 30.00 5062.08 3937.24 3938.65 1.40 3938.65 0.02 3.23 BP_ MWD+IFR+MS 89 8271.63 90.83 2.30 30.14 5061.32 3967.37 3968.75 2.57 3968.75 0.04 4.05 BP _MWD+IFR+MS 90 8301.69 90.76 1.61 30.06 5060.91 3997.43 3998.79 3.59 3998.79 0.05 2.31 BP _MWD+IFR+MS • SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 5 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (f t) (ft) (f t) (ft) (ft) (deg) 100f) type (deg) 91 8331 86 90.53 1 56 30.17 5060 57 4027.59 4028.95 4.43 4028.95 0.06 0.78 BP_ MWD+IFR+MS 92 8360.25 90.52 0.38 28.39 5060.31 4055.98 4057.33 4.91 4057.34 0.07 4.16 BP_ MWD+IFR+MS 93 8390.41 92.34 0.07 30.16 5059.55 4086.12 4087.48 5.03 4087.46 0.07 6.12 BP_ MWD+IFR+MS 94 8421.56 91.35 359.02 31.15 5058.55 4117.24 4118.61 4.78 4118.62 0.07 4.63 BP_ MWD+IFR+MS 95 8451.43 91.24 358.47 29.87 5057.87 4147.06 4148.47 4.12 4148.47 0.06 1.88 BP_ MWD+IFR+MS 96 8481.63 93.03 357.57 30.20 5056.75 4177.18 4178.63 3.08 4178.63 0.04 6.63 BP_ MWD+IFR+MS 97 8511.85 92.93 357.41 30.22 5055.18 4207.29 4208.78 1.76 4208.78 0.02 0.62 BP_ MWD+IFR+MS 98 8541.01 92.69 357.89 29.16 5053.75 4236.34 4237.88 0.57 4237.88 0.01 1.84 BP_ MWD+IFR+MS 99 8571.89 92.79 357.50 30.88 5052.27 4267.12. 4268.70 -0.67 4268.70 359.99 1.30 BP_ MWD+IFR+MS 100 8598.09 92.62 356.91 26.20 5051.04 4293.21 4294.84 -1.95 4294.84 359.97 2.34 BP_ MWD+IFR+MS 101 8634.27 92.38 357.93 36.18 5049.46 4329.26 4330.95 -3.58 4330.95 359.95 2.89 BP_ MWD+IFR+MS 102 8666.21 92.69 357.32 31.94 5048.05 4361.10 4362.83 -4.90 4362.83 359.94 2.14 BP_ MWD+IFR+MS 103 8698.28 93.00 356.74 32.07 5046.45 4393.03 4394.81 -6.56 4394.82 359.91 2.05 BP_ MWD+IFR+MS 104 8730.31 94.06 357.86 32.03 5044.48 4424.91 4426.75 -8.07 4426.75 359.90 4.81 BP_ MWD+IFR+MS 105 8763.75 93.34 356.80 33.44 5042.32 4458.19 4460.08 -9.62 4460.09 359.88 3.83 BP_ MWD+IFR+MS 106 8794.28 91.49 354.64 30.53 5041.04 4488.53 4490.50 -11.90 4490.51 359.85 9.31 BP _MWD+IFR+MS 107 8823.97 94.03 354.53 29.69 5039.61 4517.96 4520.02 -14.70 4520.04 359.81 8.56 BP _MWD+IFR+MS 108 8857.84 94.78 355.50 33.87 5037.01 4551.51 4553.66 -17.63 4553.69 359.78 3.61 BP _MWD+IFR+MS 109 8888.47 94.51 356.12 30.63 5034.53 4581.89 4584.10 -19.86 4584.15 359.75 2.20 BP _MWD+IFR+MS 110 8916.67 94.24 355.72 28.20 5032.37 4609.87 4612.15 -21.86 4612.20 359.73 1.71 BP _MWD+IFR+MS 111 8948.92 92.65 356.55 32.25 5030.44 4641.92 4644.27 -24.03 4644.33 359.70 5.56 BP _MWD+IFR+MS 112 8980.57 90.70 355.45 31.65 5029.51 4673.41 4675.83 -26.24 4675.90 359.68 7.07 BP _MWD+IFR+MS 113 9011.98 91.49 355.74 31.41 5028.91 4704.64 4707.14 -28.65 4707.23 359.65 2.68 BP _MWD+IFR+MS 114 9043.90 91.90 355.92 31.92 5027.97 4736.39 4738.96 -30.97 4739.06 359.63 1.40 BP _MWD+IFR+MS 115 9076.36 91.69 355.67 32.46 5026.95 476$.67 4771.32 -33.35 4771.43 359.60 1.01 BP _MWD+IFR+MS 116 9108.20 91.38 355.20 31.84 5026.10 4800.31 4803.04 -35.88 4803.18 359.57 1.77 BP _MWD+IFR+MS 117 9140.07 91.07 354.20 31.87 5025.42 4831.95 4834.77 -38.82 4834.92 359.54 3.28 BP _MWD+IFR+MS 118 9171.63 91.62 354.78 31.56 5024.67 4863.26 4866.17 -41.85 4866.35 359.51 2.53 BP _MWD+IFR+MS 119 9203.50 91.66 354.74 31.87 5023.76 4894.90 4897.90 -44.76 4898.10 359.48 0.18 BP _MWD+IFR+MS 120 9235.86 91.28 354.40 32.36 5022.93 4927.00 4930.10 -47.82 4930.33 359.44 1.58 BP _MWD+IFR+MS ~J SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 6 of 9 Seq ________ Measured Incl Azimuth ______ Course ________ TVD ________ Vertical _________ Displ _______ Displ _ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- dis 1 p Azim (de / g tool Corr - (ft) (deg) (deg) (f t) (f t) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 121 9267 39 91 04 355 51 31 53 5022 29 4958 32 4961 50 -50.60 4961.76 359.42 3.60 BP_ MWD+IFR+MS 122 9299.76 91.93 356.96 32.37 5021.46 4990.54 4993.79 -52.72 4994.07 359.40 5.25 BP_ MWD+IFR+MS 123 9331.30 92.27 356.81 31.54 5020.30 5021.95 5025.26 -54.43 5025.56 359.38 1.18 BP_ MWD+IFR+MS 124 9363.69 91.66 356.70 32.39 5019.19 5054.21 5057.58 -56.27 5057.90 359.36 1.91 BP_ MWD+IFR+MS 125. 9395.72 90.94 356.79 32.03 5018.46 5086.12 5089.55 -58.09 5089.88 359.35 2.27 BP_ MWD+IFR+MS 126 9427.55 90.66 356.68 31.83 5018.02 5117.83 5121.33 -59.90 5121.68 359.33 0.95 BP_ MWD+IFR+MS • 127 9459.45 90.18 356.10 31.90 5017.78 5149.60 5153.16 -61.91 5.153.54 359.31 2.36 BP_ MWD+IFR+MS 128 9490.50 90.46 358.22 31.05 5017.61 5180.56 5184.17 -63.44 5184.56 359.30 6.89 BP_ MWD+IFR+MS 129 9522.63 90.87 358.64 32.13 5017.24 5212.64 5216.29 -64.32 5216.68 359.29 1.83 BP_ MWD+IFR+MS 130 9554.44 90.77 358.22 31.81 5016.78 5244.40 5248.08 -65.20 5248.49 359.29 1.36 BP_ MWD+IFR+MS 131 9586.71 90.49 358.24 32.27 5016.43 5276.61 5280.34 -66.19 5280.75 359.28 0.87 BP_ MWD+IFR+MS 132 9618.28 90.39 359.52 31.57 5016.19 5308.15 5311.90 -66.81 5312.32 359.28 4.07 BP_ MWD+IFR+MS 133 9650.73 91.21 0.33 32.45 5015.73 5340.58 5344.34 -66.85 5344.76 359.28 3.55 BP_ MWD+IFR+MS 134 9687.12 90.97 0.41 36.39 5015.04 5376.96 5380.73 -66.62 5381.14 359.29 0.70 BP_ MWD+IFR+MS 135 9719.10 90.49 359.30 31.98 5014.63 5408.92 5412.70 -66.70 5413.11 359.29 3.78 BP_ MWD+IFR+MS 136 9751.03 90.18 359.36 31.93 5014.45 5440.82 5444.63 -67.07 5445.04 359.29 0.99 BP_ MWD+IFR+MS 137 9783.01 90.42 1.13 31.98 5014.28 5472.79 5476.61 -66.94 5477.02 359.30 5.59 BP_ MWD+IFR+MS 138 9814.17 91.35 1.53 31.16 5013.80 5503.95 5507.76 -66.21 5508.15 359.31 3.25 BP _MWD+IFR+MS 139 9846.68 89.66 3.18 32.51 5013.51 5536.45 5540.23 -64.88 5540.61 359.33 7.26 BP _MWD+IFR+MS 140 9878.76 89.84 4.44 32.08 5013.65 5568.51 5572.24 -62.74 5572.60 359.35 3.97 BP _MWD+IFR+MS 141 9910.83 90.04 3.93 32.07 5013.68 5600.54 5604.23 -60.40 5604.55 359.38 1.71 BP _MWD+IFR+MS 142 9943.83 89.56 4.75 33.00 5013.80 5633.50 5637.13 -57.91 5637.43 359.41 2.88 BP _MWD+IFR+MS 143 9975.20 88.59 4.52 31.37 5014.31 5664.82 5668.40 -55.37 5668.67 359.44 3.18 BP _MWD+IFR+MS 144 10001.09 89.94 4.02 25.89 5014.64 5690.68 5694.21 -53.45 5694.46 359.46 5.56 BP _MWD+IFR+MS 145 10032.67 90.01 4.01 31.58 5014.65 5722.23 5725.71 -51.23 5725.94 359.49 0.22 BP _MWD+IFR+MS 146 10071.13 89.63 3.86 38.46 5014.77 5760.66 5764.08 -48.59 5764.29 359.52 1.06 BP _MWD+IFR+MS 147 10102.94 89.29 4.06 31.81 5015.07 5792.44 5795.81 -46.40 5796.00 359.54 1.24 BP _MWD+IFR+MS 148 10135.46 88.88 3.85 32.52 5015.59 5824.93 5828.25 -44.16 5828.42 359.57 1.42 BP _MWD+IFR+MS 149 10167.11 89.32 2.97 31.65 5016.09 5856.55 5859.84 -42.27 5859.99 359.59 3.11 BP _MWD+IFR+MS 150 10198.79 89.22 3.04 31.68 5016.49 5888.22 5891.48 -40.61 5891.62 359.61 0.39 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 7 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 10231 26 88 81 3 87 32 47 5017 05 5920.67 5923.88 -38.66 5924.01 359.63 2.85 BP_ MWD+IFR+MS 152 10262.98 88.53 2.88 31.72 5017.79 5952.36 5955.54 -36.79 5955.65 359.65 3.24 BP_ MWD+IFR+MS 153 10295.02 88.30 2.68 32.04 5018.67 5964.38 5967.53 -35.24 5987.63 359.66 0.95 BP_ MWD+IFR+MS 154 10327.33 87.78 3.06 32.31 5019.78 6016.67 6019.78 -33.62 6019.87 359.68 1.99 BP_ MWD+IFR+MS 155 10359.15 88.88 2.67 31.82 5020.71 6048.46 6051.54 -32.03 6051.63 359.70 3.67 BP_ MWD+IFR+MS 156 10390.53 89.19 4.20 31.38 5021.23 6079.82 6082.86 -30.15 6082.94 359.72 4.97 BP_ MWD+IFR+MS 157 10422.90 88.74 4.20 32.37 5021.82 6112.15 6115.14 -27.78 6115.20 359.74 1.39 BP_ MWD+IFR+MS 158 10454.74 88.40 4.12 31.84 5022.61 6143.95 6146.89 -25.47 6146.94 359.76 1.10 BP_ MWD+IFR+MS 159 10486.10 88.43 3.92 31.36 5023.48 6175.27 6178.16 -23.27 6178.20 359.78 0.64 BP_ MWD+IFR+MS 160 10519.62 88.47 4.46 33.52 5024.39 6208.74 6211.58 -20.82 6211.61 359.81 1.61 BP_ MWD+IFR+MS 161 10550.69 87.89 4.39 31.07 5025.37 6239.75 6242.54 -18.43 6242.56 359.83 1.88 BP_ MWD+IFR+MS 162 10581.78 88.77 4.34 31.09 5026.28 6270.79 6273.52 -16.06 6273.54 359.85 2.84 BP_ MWD+IFR+MS 163 10609.36 88.81 4.77 27.58 5026.86 6298.33 6301.01 -13.87 6301.03 359.87 1.57 BP _MWD+IFR+MS 164 10641.83 88.98 6.27 32.47 5027.49 6330.71 6333.32 -10.75 6333.33 359.90 4.65 BP _MWD+IFR+MS 165 10673.22 88.95 5.75 31.39 5028.05 6362.00 6364.53 -7.46 6364.54 359.93 1.66 BP _MWD+IFR+MS 166 10705.41 88.74 6.31 32.19 5028.70 6394.09 6396.54 -4.08 6396.54 359.96 1.86 BP _MWD+IFR+MS 167 10737.46 88.33 6.83 32.05 5029.52 6426.01 6428.37 -0.42 6428.37 360.00 2.07 BP _MWD+IFR+MS 168 10768.66 88.19 6.89 31.20 5030.47 6457.06 6459.33 3.31 6459.33 0.03 0.49 BP _MWD+IFR+MS 169 10800.95 88.02 6.32 32.29 5031.54 6489.20 6491.39 7.02 6491.39 0.06 1.84 BP _MWD+IFR+MS 170 10837.29 88.78 5.59 36.34 5032.55 6525.42 6527.52 10.79 6527.53 0.09 2.90 BP _MWD+IFR+MS 171 10868.87 89.05 5.40 31.58 5033.15 6556.92 6558.95 13.81 6558.96 0.12 1.05 BP _MWD+IFR+MS 172 10901.83 88.71 4.89 32.96 5033.79 6589.81 6591.77 16.77 6591.79 0.15 1.86 BP _MWD+IFR+MS 173 10933.06 89.22 3.21 31.23 5034.36 6621.00 6622.91 18.97 6622.94 0.16 5.62 BP _MWD+IFR+MS 174 10962.79 89.77 3.13 29.73 5034.62 6650.72 6652.60 20.62 6652.63 0.18 1.87 BP _MWD+IFR+MS 175 10995.74 89.32 3.06 32.95 5034.88 6683.66 6665.50 22.39 6685,54 0.19 1.38 BP _MWD+IFR+MS 176 11026.75 88.95 2.47 31.01 5035.35 6714.66 6716.47 23.89 6716.51 0.20 2.25 BP _MWD+IFR+MS 177 11057.87 89.29 1.55 31.12 5035.83 6745.77 6747.56 24.98 6747.61 0.21 3.15 BP _MWD+IFR+MS 178 11089.89 89.50 1.20 32.02 5036.17 6777.79 6779.57 25.75 6779.62 0.22 1.27 BP _MWD+IFR+MS 179 11122.08 88.81 2.10 32.19 5036.64 6809.97 6811.75 26.68 6811.80 0.22 3.52 BP _MWD+IFR+MS 180 11154.36 88.54 1.37 32.28 5037.39 6842.25 6844.00 27.65 6844.06 0.23 2.41 BP _MWD+IFR+MS • SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 8 of 9 ___ Seq ________ Measured ______ Incl _______ Azimuth ______ Course ________ TVD ________ Vertical ____ Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/w- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (f t) (f t) (ft) (deg) 100f) type (deg) 181 11186 80 88.26 1 55 32 44 5038 29 6874.67 6876.42 28.48 6876.48 0.24 1.03 BP_ MWD+IFR+MS 182 11217.12 88.71 359.97 30.32 5039.10 6904.98 6906.72 28.88 6906.78 0.24 5.42 BP_ MWD+IFR+MS 183 11248.36 88.50 359.05 31.24 5039.86 6936.19 6937.95 28.62 6938.01 0.24 3.02 BP_ MWD+IFR+MS 184 11281.30 89.36 359.72 32.94 5040.47 6969.10 6970.88 28.26 6970.94 0.23 3.31 BP_ MWD+IFR+MS 185 11313.84 90.04 359.72 32.54 5040.64 7001.62 7003.42 28.10 7003.48 0.23 2.09 BP_ MWD+IFR+MS 186 11345.29 89.80 359.22 31.45 5040.69 7033.05 7034.87 27.81 7034.93 0.23 1.76 BP_ MWD+IFR+MS 187 11377.44 88.81 359.85 32.15 5041.08 7065.18 7067.02 27.55 7067.07 0.22 3.65 BP_ MWD+IFR+MS 188 11409.78 87.17 0.68 32.34 5042.21 7097.49 7099.34 27.70 7099.39 0.22 5.68 BP_ MWD+IFR+MS 189 11441.13 88.09 0.88 31.35 5043.51 7128.81 7130.66 28.13 7130.71 0.23 3.00 BP_ MWD+IFR+MS 190 11473.13 88.50 2.44 32.00 5044.46 7160.79 7162.63 29.05 7162.69 0.23 5.04 BP_ MWD+IFR+MS 191 11505.02 88.33 5.58 31.89 5045.34 7192.64 7194.42 31.28 7194.49 0.25 9.86 BP_ MWD+IFR+MS 192 11536.72 87.99 6.82 31.70 5046.36 7224.22 7225.92 34.70 7226.00 0.28 4.05 BP_ MWD+IFR+MS 193 11564.16 87.78 6.52 27.44 5047.37 7251.53 7253.16 37.89 7253.26 0.30 1.33 BP_ MWD+IFR+MS 194 11600.02 87.61 6.20 35.86 5048.81 7287.23 7288.77 41.86 7288.89 0.33 1.01 BP_ MWD+IFR+MS 195 11632.31 87.81 6.42 32.29 5050.10 7319.39 7320.84 45.40 7320.98 0.36 0.92 BP_ MWD+IFR+MS 196 11664.41 88.78 5.44 32.10 5051.06 7351.38 7352.75 48.72 7352.91 0.38 4.29 BP_ MWD+IFR+MS 197 11694.83 89.29 6.67 30.42 5051.57 7381.70 7383.00 51.93 7383.18 0.40 4.38 BP_ MWD+IFR+MS 198 11727.83 89.12 6.95 33.00 5052.03 7414.56 7415.76 55.84 7415.97 0.43 0.99 BP_ MWD+IFR+MS 199 11758.50 87.54 6.54 30.67 5052.92 7445.09 7446.20 59.44 7446.44 0.46 5.32 BP_ MWD+IFR+MS 200 11788.23 86.41 6.45 29.73 5054.49 7474.67 7475.70 62.80 7475.97 0.48 3.81 BP_ MWD+IFR+MS 201 11819.16 86.68 7.89 30.93 5056.36 7505.39 7506.33 66.65 7506.63 0.51 4.73 BP_ MWD+IFR+MS 202 11851.30 86.40 7.42 32.14 5058.30 7537.29 7538.13 70.93 7538.46 0.54 1.70 BP_ MWD+IFR+MS 203 11882.79 86.03 7.37 31.49 5060.37 7568.55 7569.29 74.97 7569.66 0.57 1.19 BP _MWD+IFR+MS 204 11917.57 86.83 8.50 34.78 5062.54 7603.04 7603.67 79.76 7604.09 0.60 3.98 BP _MWD+IFR+MS 205 11949.35 89.97 9.09 31.78 5063.43 7634.55 7635.06 64.62 7635.53 0.63 10.05 BP _MWD+IFR+MS 206 11981.70 90.15 8.84 32.35 5063.39 7666.63 7667.01 89.66 7667.54 0.67 0.95 BP _MWD+IFR+MS 207 12013.53 90.08 9.90 31.83 5063.33 7698.17 7698.42 94.84 7699.00 0.71 3.34 BP _MWD+IFR+MS 208 12040.78 89.84 9.84 27.25 5063.35 7725.13 7725.26 99.51 7725.90 0.74 0.91 BP _MWD+IFR+MS 209 12078.12 89.46 10.04 37.34 5063.58 7762.07 7762.04 105.96 7762.77 0.78 1.15 BP _MWD+IFR+MS 210 12108.80 89.87 9.94 30.68 5063.76 7792.42 7792.26 111.28 7793.05 0.82 1.38 BP _MWD+IFR+MS J ~~ SCHLUMBERGER Survey Report 8-Feb-2007 12:25:31 Page 9 of 9 Seq Measured Incl Azimuth Course TVD -------- Vertical -------- Displ -------- Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- dis 1 P Azim (de / 9 tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg) 211 12140.99 91.01 9 38 32 19 5063 51 7824.28 7823 99 116.68 7824.86 0.85 3.95 BP_ MWD+IFR+MS 212 12173.30 92.48 9.39 32.31 5062.52 7856.27 7855.85 121.95 7856.80 0.89 4.55 BP_ MWD+IFR+MS 213 12204.36 92.34 10.22 31.06 5061.22 7886.99 7886.43 127.23 7887.46 0.92 2.71 BP_ MWD+IFR+MS 214 12236.96 92.31 10.01 32.60 5059.90 7919.19 7918.50 132.95 7919.61 0.96 0.65 BP_ MWD+IFR+MS 215 12268.77 91.86 9.53 31.81 5058.74 7950.66 7949.82 138.35 7951.03 1.00 2.07 BP_ MWD+IFR+MS 216 12300.53 91.66 8.54 31.76 5057.76 7982.13 7981.17 143.33 7982.46 1.03 3.18 BP_ MWD+IFR+MS 217 12332.96 91.35 7.71 32.43 5056.91 8014.34 8013.27 147.91 8014.63 1.06 2.73 BP_ MWD+IFR+MS 218 12365.50 90.52 9.05 32.54 5056.38 8046.64 8045.46 152.66 8046.90 1.09 4.84 BP_ MWD+IFR+MS 219 12396.51 91.80 9.88 31.01 5055.75 8077.35 8076.04 157.75 8077.58 1.12 4.92 BP_ MWD+IFR+MS 220 12429.37 92.17 10.17 32.86 5054.61 8109.83 8108.38 163.47 8110.02 1.15 1.43 BP_ MWD+IFR+MS 221 12460.73 91.97 10.84 31.36 5053.48 8140.79 8139.19 169.18 8140.95 1.19 2.23 BP_ MWD+IFR+MS 222 12492.13 91.86 10.62 31.40 5052.43 8171.77 8170.02 175.03 8171.90 1.23 0.78 BP_ MWD+IFR+MS 223 12524.32 92.10 10.36 32.19 5051.32 8203.55 8201.66 180.88 8203.65 1.26 1.10 BP_ MWD+IFR+MS 224 12555.37 91.69 10.52 31.05 5050.29 8234.21 8232.17 186.51 8234.29 1.30 1.42 BP_ MWD+IFR+MS 225 12586.75 90.70 9.97 31.38 5049.64 8265.22 8263.05 192.09 8265.28 1.33 3.61 BP _MWD+IFR+MS 226 12619.80 89.98 9.51 33.05 5049.44 8297.93 8295.62 197.68 8297.97 1.37 2.59 BP _MWD+IFR+MS 227 12649.19 90.08 9.79 29.39 5049.43 8327.03 8324.59 202.61 8327.06 1.39 1.01 BP _MWD+IFR+MS 228 12673.82 89.91 9.27 24.63 5049.43 8351.42 8348.88 206.68 8351.44 1.42 2.22 BP _MWD+IFR+MS 229 12730.00 89.20 9.27 56.18 5049.87 8407.09 8404.33 215.73 8407.10 1.47 1.26 Proj. to TD • • [(c)2007 IDEAL ID12_OC_O1] • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC) Well No W-204L1 Date Dispatched: 2-Mar-07 Installation/Rig Nabors-7ES Dispatched By: Nate Rose LWD Log Delivery V1.1,10-02-03 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: dames H. Johnson ReCeiVed By: BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) `~ ~~ - `~J V ~ 900 E. Benson Blvd. ` Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojhC~bp.com ao~, „-~ 3` ~~ ®i~I L>•lst/ l~-7 COI~TSER~ATIOK CODIIK15SI01`T Robert Tirpack Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519 FRANK H. MURKOWSKI, GOVERNOR j% 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Polaris Oil Pool, W-204L 1 BP Exploration (Alaska) Inc. Permit No: 206-159 Surface Location: 4859' FSL, 1177' FEL, SEC. 21, T11N, R12E, UM Bottomhole Location: 2601' FSL, 943' FEL, SEC. 09, T 11 N, R 12E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well PBU W-204, Permit No. 206-158, API No. 50-029-23333-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this day of November, 2006 cc: Department of Fish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~~r~ STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMMON PERMIT TO DRILL 20 AAC 25.005 ~. ~. ~.~ ~,~~ _ ;.~ r_,. Z~(aoo~~ 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ~ ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is Pr'm!pq~ for: ^ Coalbed Methane ~ G2s Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: W-204L1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12652 TVD 5152 12. Field /Pool(s): Prudhoe Bay Field /Polaris Pool 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028261 FEL, SEC. 21, T11N, R12E, UM FSL, 1177 4859 Top of Productive Horizon: 1319' FSL, 916' FEL, SEC. 16, T11 N, R12E, UM (OBc) 8. Land Use Permit: 13. Approximate Spud Date: December 8, 2006 Total Depth: 2601' FSL, 943' FEL, SEC. 09, T11 N, R12E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 16,020' 4b. Location of Well (State Base Plane Coordinates): Surface: x-612049 y-5959836 Zone-ASP4 10. KB Elevation Plan (Height above GL): 81.5 feet 15. Distance to Nearest Well within Pool: 258' 16. Deviated Wells: Kickoff Depth: .5541 feet Maximum Hole An le: 91 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2250 Surface: 1750 18. Casin Pr S e ift s T - Se i' th - B m n i f Cemen c.f. or cks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-8 IBT 7136' 5516' 5051' 12652' 5152' Uncemented Slo ed Liner 1 g, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 12662 Total Depth TVD (ft): 5207 Plugs (measured): None Effective Depth MD (ft): 12662 Effective Depth TVD (ft): 5207 Junk (measured): None sing Length ize ement Volume D D Conductor /Structural 11 20" x 4" x Arc is Se A rox. 110' 110' Surface 334 ' 10-3/4" 599 sx A Lite 441 sx Cla s 'G' 3346' 327' Intermediate 5861' 7-5/8" 431 sx Cla 'G' 58 1' 5132' Pr i n Liner 6801' 4-1/2" Uncement d Slotted Liner OBd 5861' - 12662' 51 1' - 5206' Perforation Depth MD (ft): Slotted Liner Perforation Depth TVD (ft): Slotted Liner 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Ken Allen, 564-4366 Printed Name Robert Tirpack Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~ ~~=z~ ~ Phone 564-4166 Date ~> :~ Ct, Terrie Hubble, 564-4628 Commission Use Ont Permit To Drill Number: ZO~- API Number: Permit A pr val 50- d Z " Z ~ ~ ~ 3 '~ Da e: See cover letter for other r it ments Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: j~ i~ Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~No '!? S t, ~ ~~ c ~ p 7j ~j D D ~/! ~' HZS Measures: ~ Yes ^ No ctional Survey Req'd:~Yes ^ No Other: /~, f APPROVED BY THE COMMISSION Date !(' ~ ~: , - ,COMMISSIONER Form 10-401 Revised 12/2005 - "'~. r ~, " i ~ ~ //~~, ~/ - ~uom¢ m uupucate ~ • Well Name: I W-204, W-204L1 & W-204L2 I Drill and Complete Plan Summary Type of Well (producer or injector): Schrader Bluff OBa, OBc, and OBd Multi-Lat producer Surface Location: X = 612,049 Y = 5,959,836 As Built Sec 21, T 11 N, R 12E, FEL: 1176.6', FNL: 420.9' W-204 OBd Target Start: X = 612,300 Y = 5,961,380 Z = 5050' TVDSS Sec 16, T 11 N, R12E, FEL: 899.1', FSL: 1119.2' W-204 OBd Target End: X =.612,150 Y = 5,968,140 Z = 5125' TVDSS Sec 9, T 11 N, R12E, FEL: 932.9', FSL: 2601.2' W-204L1 OBc Target Start: X = 612,280 Y = 5,961,580 Z = 4995' TVDSS Sec 16, T 11 N, R12E, FEL: 915.7', FSL: 1319.5' W-204L1 OBc Target End: X = 612,140 Y = 5,968,140 Z = 5070' TVDSS Sec 9, T 11 N, R12E, FEL: 943', FSL: 2601.3' W-204L2 OBa Target Start: X = 612,298 Y = 5,961,460 Z = 491'5 TVDSS Sec 16, T 11 N, R12E, FEL: 899.7', FSL: 1199.2' W-204L1 OBa Target End: X = 612,140 Y = 5,968,140 Z = 4990' TVDSS Sec 9, T 11 N, R12E, FEL: 943', FSL: 2601.3' AFE Number: PLD5M1082 Ri Nabors 7ES GL: 53' RT: 28.5' RTE: 81.5' Estimated Start Date: December 08, 2006 Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Well Type: Current Status: Conductor: BHT: BHP: O eratin da s to com lete: 48 16,020' to PBU boundary 258' from W-23 at 4,859' in W-204 wp09 Schrader O-sand Tri-lateral Producer New well 20" X 34", 215.5 ppf, set at 110' KB 105 °F 8.2 - 8.7 EMW ppg in Schrader O-sands W-204, L1 & L2 Permit to Drill 11/07/06 • Formation Markers: • 7 Formation To s TVDss and Estimated Pore Pressures Est. Commercial Est. Formation Hydrocarbon Pore Est. Pore To s Uncertain Bearin Press. Press. (PP9 Formation TVDss feet Yes/No Psi EMW NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -295 +/-50' No 134 8.8 SV6 -1200 +/-50' No 546 8.8 SV5 -1840 +/-50' No 837 8.8 Base Permafrost -1845 +/-50' No 839 8.8 SV4 -1995 +/-50' Gas H orates 908 8.8 Fault #1 -2355 +/- 150' MD -See Fault Section SV3 -2510 +/-50' Gas H orates 1142 8.8 Poss. Free Gas or Gas SV2 -2700 +/-50' H orates 1229 8.8 Poss. Free Gas or Gas SV1 -2990 +/-50' H orates 1360 8.8 UG4 -3325 +/-50' Thin coal 1513 8.8 Heavy Oil between -3365 UG4A -3365 +/-50' and -3525' SS 1531 8.8 Thin coals; Poss. Heavy oil between 3900'- UG3 -3705 +/-50' 3950' ss 1686 8.8 UG1 -4155 +/-50' No, water 1891 8.8 Heavy Oil between -4465 UG_Ma -4465 +/-50' and -4495' SS 2050 8.8 Heavy Oil UG_Mb1 -4510 +/-50' and -4540' SS 2070 8.8 Heavy Oil e UG_Mb2 -4555 +/-50' 45s0' SS and - 2090 8.8 UG_Mc -4620 +/-50' No, water 2120 8.8 SB_Na -4685 +/-25' No, water 2150 8.8 SB_Nb -4710 +/-25' No, water 2160 8.8 SB_Nc -4740 +/-25' No, water 2170 8.8 SB_Ne -4750 +/-25' No, water 2180 8.8 SB_OA -4845 +/-25' No, water 2200 8.7 2120 - SB_OBa -4890 +/-25' Yes 2200 8.3-8.7 2180- SB_OBb -4920 +/-25' Yes 2220 8.5-8.7 2200- SB_OBc -4965 +/-25' Yes 2240 8.5-8.7 2140- SB OBd -5025 +/-25' Yes 2250 8.2-8.6 SB_OBe Not Reached +/-25' Yes 2290 8.7 Permit to Drill W-204 Multilateral Version 1.0 • • Formation pressures from surface to the Ma are calculated based on a .455 water gradient. Formation pressures from the UG_Ma down to the SB_OA are based on W-200P61 RFT pressures taken before start of W Pad Schrader Bluff production. Formation pressures in the SB_OBa through SB_OBd sands are estimated and assume these sands will show moderate pressure depletion resulting from W-200 and W-201 Wellbore TD Criteria: TD for all laterals is planned to be at end of polygon. No rathole is necessary. No extensions beyond the end of the polygons are planned, however if extended poor rock quality is encountered while drilling, some laterals could be ended sooner. If structure along the laterals comes in substantially deep to prognosis, then the OBa lateral may be ended sooner than the polygon end to avoid approaching any closer than 1500 feet to the minimum case OWC location. If O sand structure comes in shallow to prognosis, the OBa lateral should be terminated at the point where the top OBa marker depth is projected to reach a depth of -4970 feet TVDSS. Terminating the OBa lateral at this depth will still leave a minimum of 1500 feet of lateral standoff to the minimum case OWC depth at -5030 feet TVDSS. O sand structural depths along the W-204 laterals should be well established by the time the OBd lateral is drilled. Thus, there should be between 5 and 10 days of time prior to drilling the OBa lateral to reconfigure the OBa lateral profile, if necessary. Mud Pro ram: 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densit Funnel vis YP PH FL Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logging Program: 13-1/2" Hole Section: Surface Gyro will be needed. Once clear of Magnetic interference MWD Surveys will be IIFR corrected real time with multi-station anal is a lied. O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: MWD Surve s will be IIFR corrected real time with multi-station anal sis a plied. Open hole: MWD: Dir / GR / Res / Azimuthal Den / Neu /PWD DPC: 5 MDT oil Sam les & 30 MDT Pressures Cased Hole: USIT/CBL 6-3/4" Produciton Holes: MWD Surve s will be IIFR corrected real time with multi-station anal is applied. O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM /PWD Cased Hole: N/A 3 ~ Permit to Drill W-204 Multilateral Version 1.0 • Casina/Tubina Program Hole Size Csg / Tb O.D. Wt/Ft Grade Conn Burst si Collapse si Length Top MD /TVD Bottom MD /TVD 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/z" 10-3/a" 45.5# L-80 BTC 5,210 2,480 3346' GL 3346' / 3327' 9'/s" 7-°/a' 29.7# L-80 BTC-M / TC-I I 6,890 4,790 5861' GL 5861' / 5132' 6-3/a" OBd 4-'/z" slotted 12.6# L-80 IBT N/A N/A 6801' 5861' / 5131' 12662' / 5206' 6-3/a" OBc 4-'h" slotted 12.6# L-80 IBT N/A N/A 7136' 5516' / 5051' 12652' / 5151 6-3/a" OBa 4-'/z" slotted 12.6# L-80 IBT N/A N/A 7323' 5326' / 4976' 12649' / 5071' Tubin 4-'h" 12.6# 13Cr-80 Vam To 8,430 7,500 5300' GL 5300' / 4964' Surface and Anti-Collision Issues Surface Shut-in Wells: W-201 will require surface shut-in and well house removal in order to move over well W-204. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: All wells pass BP's major risk Anti-collision criteria scan. There are no wells that will require subsurface isolation for this profile. Cement Calculations Casing Size: 10-3/a -in 45.5-Ib/ft L-80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost lead TOC: Surface Tail: 1,000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2,346' MD 1,000' MD above shoe Total Cement Volume: Spacer 75 bbls of Viscosified Spacer weighted to 10.00 ppg (Mud Push) Lead 473 bbls, 2658 ft , 599 sks 10.7 Ib/ al ASL G + additives - 4.44 ft /sk Tail 92 bbls, 516 ft , 441 sks 15.8 Ib/ al Class G + additives -1.17 ft /sk Temp BHST --66° F, BHCT -60° F estimated by BP RP. In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. 7-5/8", 29.7-Ib/ft L-80 Basis: Lead: None Lead TOC: N/A Tail: 2257' of open hole with 30% excess, plus 80' shoe track Tail TOC: 4146' MD 507' MD above the Ma, 800' MD below Surface Shoe Total Cement Volume: Wash 20 bbls CW100 S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.7 Tail 89 bbls, 500 ft , 431 sks 15.8 Ib/ al G + Gasblok -1.16 ft /sk Temp BHST ~ 102° F, from SOR. BHCT ~85° F estimated b BP RP. Centralizer Recommendations 10-~/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7-6/e" Casing Space Out a) Spaceout the 7-°/s" casing to place a full joint in the window area of the OBb, OBa and OA sands. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window 4 Permit to Drill W-204 Multilateral Version 1.0 depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125' above the casing shoe. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, ROPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole. Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test -9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: • Integrity Test - 6-3/4" hole: • Kick Tolerance: • Planned completion fluid: 2,250 psi -Schrader OBd (8.6 ppg C~? 5,025' TVDss) 1,750 psi -Based on a full column of gas @ 0.10 psi/ft 3,500 psi/250 psi Rams ~ 2,500 psi/250 psi Annular 3,500 psi (45.5# L-80 casing burst is 5,210 psi) LOT 53 bbls with a 10.8 ppg EMW LOT, 9.2ppg mud and 8.7 ppg OBd EMW 2,250 psi -Schrader OBd (8.6 ppg ~ 5,025' TVDss) 1,750 psi -Based on a full column of gas C~ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular ~ 3,500 psi FIT to 10.2 ppg EMW for OBd lateral only Infinite at OBd, OBc, OBa, and OA with an 10.2 ppg EMW FIT 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 Permit to Drill W-204 Multilateral Version 1.0 • Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.2-8.7 ppg EMW. This pressure is estimated based on offset well pressures and material balance. II. Hydrates and Shallow gas A. Gas Hydrates are possible at W-pad from the SV5 thru the SV1 sands below the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole although there are previous instances of gas from the SV1 into the Ugnu on W-pad. Recommended practices and precautions for drilling hydrates should be followed in the surface and intermediate hole sections. III. Fault Crossing/Lost Circulation/Breathing A. Lost circulation is not expected on this well. B. Fault #1, if detected, should be crossed in the SV3 formation, but should have a minimal throw at that depth. C. If the seismic artifact around the possible fault #2 locations does indeed turn out to be a fault then the well bore will be sidetracked to a new BHL to the East. This new location will likely be over 500' away from our current target and will require state approval before proceeding. D. Breathing is not expected on this well. E. 53 bbls with a 10.8 ppg EMW LOT, 9.2ppg mud and 8.7 ppg OBd EMW F. Wood and associated running gravels have been caused problems on previous W-pad well surface holes. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Int r' Testin Summa Table Casing set / Maximum Influx Volume Mud Weight Exp Pore Press Min LOT /FIT Interval Surface / 9 7/8" 53 9.2 8.7 OBd 10.8 LOT Intermediate / 6-3/4" Infinite 9.2 8.7 (OBd) 10.2 (FIT for OBd lateral onl NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string An FIT will only be performed for the OBd lateral, not the OBc, or OBa. 6 Permit to Drill W-204 Multilateral Version 1.0 • • V. IiVCfrogen 5ulficle #1 Closest SHL Well H2S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level #2 Closest BHL Well H2S Level Max. Recorded H2S on Pad/Facility Other Relevant H2S Data (H2S alarms from rigs, etc.) W -201 20 m 11 /1 /2005 W -200 15 m 8121 /2006 W-23A 15 m 4/14/2006 W-19A 20 m 7/4/2006 W-01 60 m 8/16/2005 All W Pad gas lift wells are expected to have H2S levels in the 5 to 60 ppm range as a result of using PBU gas lift gas. W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. VI. Faults A. Two faults could be crossed while drilling W-204. No losses are expected to be associated with these faults. B. Fault #1 -Fault is dying in throw upward. At intersection point with W-204, fault should have minimal throw. C. Fault #2 is a possible fault - if encountered, wellbore will be re-oriented to a more easterly postion. D. Fault #3 will not be crossed by W-204. Fault position and standoff defines western side of target polygon. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - SVe 2,435' -2,355 0 to -25' West +/- 150' MD Fault #2 -Possible fault - OBd Interval 6,645' -5,057' 0 to -40' East +/- 150' MD CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 7 Permit to Drill W-204 Multilateral Version 1.0 • • W-204, W-204 L1 & W-204 L2 OPERATIONS SUMMARY Pre-Rig Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drilling Rig Operations: 1. MIRU Nabors 7ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'/z" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,346' MD. The actual surface hole TD will be +/-200' TVD below the top of the SV1 sand. 3. Run and cement the 10-3/a", 45.5#, L-80 BTC-SD casing from TD back to surface. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to 3,500 psi. 4. MU 9'/e" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer 11,600' from the bit. RIH to float collar. Test the 10-3/a" casing to 3,500 psi. for 30 minutes. Note: Ensure grade is L-80. There has been some K-55 on the slope and 3,500 psi would be near 100% burst for K-55 casing. 5. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Directionally drill ahead to TD at ± 5,861' MD. 6. Run drill pipe conveyed MDT. Perform cleanout run if necessary. 7. MU and run 7 5/e", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement in one stage to -4,446' MD (1,000' MD from the surface casing shoe). Bump plug with seawater. 8. Clean pits for displacement. Freeze protect 7 5/e" x 10-3/a" annulus to 2,200' TVD. 9. RU a-line. Run USIT log from TD to surface. • W-204 OBd Lateral 10. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the 7 5/6" casing to 3,500 psi for 30 minutes. 11. Displace well over to 9.0 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation and perform FIT to 10.5 ppg EMW. 12. Directionally drill ahead to TD geo-steering through the OBd to TD at -12,662' MD. Back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 13. POOH to near OBc window depth, log the top OBc (RA marker) with GR, log across the OBa window as well. POOH. 14. MU and run 4-'h" 12.6# L-80 BTC-M slotted liner and swell packers with liner hanger and liner top packer. Position TOL for OBc whipstock. POOH. • W-204L1.OBc Lateral 15. PU the 7-8/e" whipstock assembly. Set the whipstock on the OBd liner top packer such that the top of the window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.0 ppg Versapro MOBM. Mill window. POOH. 16. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TO of OBb lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 17. Pull whipstock #1. 18. Run and set 4-'/2" slotted liner and hook hanger. POOH and LD liner running string. 19. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH. • W-204L2.OBa Lateral 20. PU the 7 °/e" whipstock assembly. Set the whipstock on the OBc liner top packer such that the top of the window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.0 ppg Versapro MOBM. Mill window. POOH. 8 Permit to Drill W-204 Multilateral Version 1.0 • • 21. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 22. Pull whipstock #2. 23. Run and set 4-'h" slotted liner with swell packers and hook hanger, POOH and LD liner running string. 24. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH. 25. Clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH. 26. MU 4-'h" 12.6# IBT-M, L-80 completion assembly tying into and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 27. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 28. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 29. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 5/8" casing annulus valves. 30. Install BPV. Secure the well and rig down /move off Nabors 7ES. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 9 Permit to Drill W-204 Multilateral Version 1.0 W-204, L1, 81: L2 PROPOSED COMPLETION TREE: FMC 4-1/16" 5M t R WELLHEAD: FMC Gen 5 System " " M~ j , mandrel Hanger & packoff , 5M csg.head w/ 7 20"X34" 215.5 Ib/ft, A53 ERW Insulated @ 109' 11 ' " " • ~ . <, 11 , 5M, tbg spool w/ f x 11 ;~ Halliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x 4-V2"tubing hanger with control Ilne ports ~ ~ t1" X 4-1/16" Adaptor Flange " ~ ` , 12.6 Ib/ft, 13CR-80, 4-1/2 " Orig KB elev (N-7ES) _' ~ t ~ VamTo Cou hn OD: 4.937 P P 9 r ,~a DrifVID : 3.833"/3.958" d " ` 10-314", 45.5# L-80 BTC Csg @ 3,346' MD 4.5" Baker sliding sleeve with 3.813" ID @ GSM Design: 7-5/8" X 5-1/2" Baker PRM Packer @ #4 - 2500' TVD - 4-1/2" X 1" KBG-2 - SV Halliburton X-Nipples (3.813" ID) #3 - 3500' TVD - 4-1/2" X 1" KBG-2 - DV #2 - 5 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV 4.5" WLEG @ 5,800' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Phoenix Pressure '~• ~': Gauge • 1 ~ Versapro SFMOBM in each Lateral and in mother bore from tbg tail down. with control lines to surface Est TOC 4,146' " ` RA Tag TBD -5/8", 29.7#, L-80, TCII to -4,946' " °• Casing Drift: 6.75 ' Casing ID: 6.875" .` Y•`, t , y i Junction Specifications: " 6.314 OBa Lateral 5,326 12,650` Junction ID through LEM o ~ `` Module without diverter: 3.68" RA Tag TBD ~ _ _. LEM run with intemai sealbores to allow the use of isolation °= - - sleeve across window. ~ Swell packer placeme nt TBD RA Tag TBD Baker Hughes Hookwall Hanger Wndow in 7-5/8" casing Well Inclination @ Window = -65 Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window = ^72 -5/8", 29.7#, L-80, BTC-M @ 5861' Casing Drift: 6.75" Casing ID: 6.875" 6-314" OBc Lateral 5,516'-12,652' ~~ Swell packer placement TBD r,. t =~,~~~ ~ _ k .. ;' 6-3/4" OBd Lateral 5,861'- 12,662' A Y R NT O P 0M20as 1a KWA 4.1Y1" GL Com lotion Levat 3 Multl La era f P ~ ~ ~P a Pt ~ ~y API NO: 50-029- N 5o-0z9- ORIO 50-029- WELL: W-204 ML 50-029- by Schlumberger W-204L1 (P41 Proaosal Report Date: September 13, 2006 Clierd: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA SWcture/Slot: W-PAD/W-204 '~~ Well: ~~~~ Plan W-204 ~ Borehole: ~~ Plan W-204L1 UWIIAPI#: 50029 Survey Name 1 Date: W-204L1 (P4) /September 13, 2006 Tort 1 AHD 1 DDI 1 ERD ratio: 130.433° / 8426.72 ft / 6.431 / 1.63E Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LaULong: N 70.29921630, W 149.09253597 Location Grid NIE YIX: N 5959836.000 ftUS, E 612049.000 ftUS Grid Convergence Angle: +0.85435460° Vertical Section Azimuth: 1.520° Y Vertical Section Odgin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 81.50 ft relative to MSL Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL Magnetic Declination: 23.941 ° Total Field Strength: 57634.919 nT Magnetic Dip: 80.883° Declination Date: November 30, 2006 Magnetic Declination Model: BGGM 2006 North Reference: True North Total Corr Mag North -> True North: +23.941 ° • Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude LongiWde Depth Section Tool Face ft de de ft ft ft ft ft de d 100 ft de 100 ft de 100 ft ftUS ftUS I op wnlpstocK Base Whipstock KOP Crv 10/100 End Crv Crv 6/100 W-204L1 OBc Tgt 1 End Crv crv sn o0 W-204L1 OBc Tgt 2 End. Crv Crv 6/100 W-204L1 OBc Tgt 3 End Crv Crv 6/100 W-204L1 OBc Tgt 4 End Crv Crv 6/100 5t)1 B.y"I lU.J25 JDO.OJ 4`J/V.VV OUVl.VU -ILl3.D8 ILVU.VI JV I.JJ riJ Y.VV J.7L -v.oo oavIVYV.LV 5527.91 72.30 356.63 4973.84 5055.34 1224.91 1217.36 300.66 --- 16.00 16.00 0.00 5961057.60 5540.91 72.30 356.63 4977.79 5059.29 1237.25 1229.72 299.94 4.98E 0.00 0.00 0.00 5961069.95 5600.00 78.19 356.11 4992.84 5074.34 1294.13 1286.73 296.32 4.85E 10.00 9.96 -0.89 5961126.89 5700.00 88.15 355.27 5004.72 5086.22 1392.78 1385.61 288.86 4.75E 10.00 9.97 -0.84 5961225.64 5737.30 91.87 354.96 5004.71 5086.21 1429.84 1422.77 285.68 --- 10.00 9.97 -0.83 5961262.74 6013.71 91.87 354.96 4995.70 5077.20 1704.30 1697.97 261.41 136.70E 0.00 0.00 0.00 5961537.52 6056.49 90.00 353.20 4995.00 5076.50 1746.71 1740.51 257.00 137.70E 6.00 -4.37 -4.11 5961580.00 6088.32 88.59 351.91 4995.39 5076.89 1778.15 1772.07 252.88 --- 6.00 -4.44 -4.04 5961611.49 7074.43 88.59 351.91 5019.70 5101.20 2750.14 2748.08 114.22 55.14R 0.00 0.00 0.00 5962585.23 7089.37 89.10 352.65 5020.00 5101.50 2764.88 2762.88 112.22 54.81 R 6.00 3.43 4.92 5962600.00 7100.00 89.47 353.17 5020.13 5101.63 2775.39 2773.42 110.90 54.81 R 6.00 3.46 4.90 5962610.53 7104.68 89.63 353.40 5020.17 5101.67 2780.02 2778.07 110.36 --- 6.00 3.46 4.90 5962615.16 7841.63 89.63 353.40 5024.94 5106.44 3509.57 3510.12 25.66 71.37R 0.00 0.00 0.00 5963345.81 7860.96 90.00 354.50 5025.00 5106.50 3528.73 3529.35 23.63 71.37R 6.00 1.92 5.69 5963365.00 7900.00 90.75 356.72 5024.75 5106.25 3567.56 3568.27 20.64 71.38R 6.00 1.92 5.69 5963403.86 7936.05 91.44 358.77 5024.06 5105.56 3603.52 3604.28 19.22 --- 6.00 1.91 5.69 5963439.85 8277.31 91.44 358.77 5015.49 5096.99 3944.28 3945.36 11.90 127.55E 0.00 0.00 0.00 5963780.75 8300.00 90.61 357.69 5015.09 5096.59 3966.93 3968.03 11.20 127.57E 6.00 -3.66 -4.76 5963803.41 8316.63 90.00 356.90 5015.00 5096.50 3983.51 3984.64 10.41 126.35E 6.00 -3.66 -4.76 5963820.00 8330.84 89.49 356.21 5015.06 5096.56 3997.67 3998.82 9.56 --- 6.00 -3.56 -4.83 5963834.17 8777.77 89.49 356.21 5019.00 5100.50 4442.67 4444.76 -19.96 123.20R 0.00 0.00 0.00 5964279.58 8800.00 88.76 357.33 5019.34 5100.84 4464.82 4466.95 -21.21 123.18R 6.00 -3.28 5.02 5964301.75 V IGJJL.LJ IV lV.JVLJIIVL VY IY.7.V~VV.7JYV 612331.45 N 70.30254202 W 149.09010089 612330.54 N 70.30257580 W 149.09010677 612326.07 N 70.30273153 W 149.09013606 612317.14 N 70.30300167 W 149.09019646 612313.41 N 70.30310318 W 149.09022217 612285.04 N 70.30385500 W 149.09041865 612280.00 N 70.30397123 W 149.09045437 612275.41 N 70.30405744 W 149.09048776 612122.23 N 70.30672383 W 149.09161070 612120.00 N 70.30676426 W 149.04 612118.53 N 70.30679308 W 149.0 7 612117.92 N 70.30680577 W 149.091 200 612022.32 N 70.30880568 W 149.09232805 612020.00 N 70.30885821 W 149.09234456 612016.43 612014.48 612002.07 612001.03 612000.00 611998.94 611962.78 611961.19 N 70.30896453 W 149.09236876 N 70.30906292 VV 149.09238026 N 70.30999471 W 149.09243958 N 70.31005665 W 149.09244525 N 70.31010202 W 149.09245161 N 70.31014077 W 149.09245852 N 70.31135905 W 149.09269767 N 70.31141967 W 149.09270781 WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-204\Plan W-204\Plan W-204L1\W-204L1 (P4) Generated 9/13/2006 9:31 AM Page 1 of 2 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft d d 100 ft de 100 ft de 100 ft ftUS ftUS W-LU4L1 UtfC I gt 5 2525LS.Ly 2ftS.UU S5tS.5V End Crv 8837.81 87.49 359.21 Crv 6/100 9158.63 87.49 359.21 W-204L1 OBc Tgt 6 9168.80 88.10 359.26 End Crv 9183.43 88.98 359.31 Crv 6/100 10265.06 88.98 359.31 W-204L1 OBc Tgt 7 10299.48 90.00 1.10 10300.00 90.02 1.12 End Crv 10320.52 90.82 2.06 Crv 6/100 10627.50 90.82 2.06 W-204L1 OBc Tgt 8 10689.71 90.00 5.70 End Crv 10689.74 90.00 5.70 Crv 6/100 11281.85 90.00 5.70 W-204L1 OBc Tgt 9 11281.88 90.00 5.70 11300.00 89.10 5.09 End Crv 11322.47 87.98 4.33 Crv 6/100 11556.31 87.98 4.33 W-204L1 OBc Tgt 10 11592.73 88.70 6.40 11600.00 88.85 6.81 End Crv 11629.80 89.47 8.49 TD / 4-1/2" Lnr 12652.17 89.47 8.49 bULV.UV 5020.57 5034.61 5035.00 5035.37 5054.69 5055.00 5055.00 5054.85 5050.45 5050.00 5050.00 5050.00 5131.50 6943.31 5050.00 5131.50 6943.34 5050.14 5131.64 6961.42 5050.71 5132.21 6983.85 5058.95 5140.45 7217.26 5060.00 5141.50 7253.58 5060.16 5141.66 7260.82 5060.59 5142.09 7290.44 5070.00 5151.50 8305.23 O I V I .OU 44tli3.U0 44~U.LL 5102.07 4502.55 4504.73 5116.11 4822.79 4825.20 5116.50 4832.95 4835.36 5116.87 4847.56 4849.99 5136.19 5928.22 5931.37 5136.50 5962.62 5965.78 5136.50 5963.14 5136.35 5983.67 5131.95 6290.60 5131.50 6352.75 5131.50 6352.77 5966.31 5986.82 6293.57 6355.63 6355.65 6944.84 6944.87 6962.90 6985.29 7218.32 7254.56 7261.78 7291.31 8302.45 -LL.VO ILJ.OOR O.VV -J.LO J.VL J.9VYJL"J.VV VII~VV.VV IV /V. JIIYOJLY YV IYJ.VJL/IYVO -22.35 --- 6.00 -3.50 4.88 5964339.50 611959.49 N 70. 31152286 W 149.09271703 -26.78 4.87R 0.00 0.00 0.00 5964659.84 611950.29 N 70. 31239838 W 149.09275292 -26.91 3.04R 6.00 5.98 0.51 5964670.00 611950.00 N 70. 31242613 W 149.09275402 -27.10 --- 6.00 5.99 0.32 5964684.62 611949.60 N 70. 31246609 W 149.09275551 -40.18 60.30R 0.00 0.00 0.00 5965765.59 611920.39 N 70. 31542035 W 149.09286159 -40.06 49.40R 6.00 2.97 5.21 5965800.00 611920.00 N 70. 31551435 W 149.09286060 -40.05 49.40R 6.00 3.90 4.56 5965800.52 611920.00 N 70. 31551578 W 149.09286052 -39.48 --- 6.00 3.90 4.56 5965821.04 611920.27 N 70. 31557182 W 149.09285590 -28.45 102.70R 0.00 0.00 0.00 5966127.89 611926.72 N 70. 31640984 W 149.0 -24.25 90.00E 6.00 -1.32 5.85 5966190.00 611930.00 N 70. 9 31657937 W 149.0 -24.24 --- 6.00 0.00 -6.00 5966190.03 611930.00 N 70. 31657944 W 149.09 1 34.55 90.OOR 0.00 0.00 0.00 5966779.97 611980.00 N 70. 31818905 W 149.09225590 34.55 145.93E 6.00 0.00 6.00 5966780.00 611980.00 N 70. 31818913 W 149.09225588 36.25 145.92E 6.00 -4.97 -3.36 5966798.06 611981.43 N 70. 31823840 W 149.09224207 38.10 --- 6.00 -4.97 -3.36 5966820.47 611982.95 N 70. 31829957 W 149.09222711 55.76 70.87R 0.00 0.00 0.00 5967053.71 611997.13 N 70. 31893617 W 149.09208392 59.17 69.69R 6.00 1.97 5.67 5967090.00 612000.00 N 70 .31903518 W 149.09205631 60.01 69.68R 6.00 2.08 5.63 5967097.23 612000.73 N 70 .31905491 W 149.09204954 63.97 --- 6.00 2.09 5.63 5967126.81 612004.25 N 70. 31913557 W 149.09201740 214.83 --- 0.00 0.00 0.00 5968140.00 612140.00 N 70 .32189792 W 149.09079436 • WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-204\Plan W-204\Plan W-204L1\W-204L1 (P4) Generated 9/13/2006 9:31 AM Page 2 of 2 by Schlumberger WELL FIELD STRUCTURE W-204L1 (P4) Prudhoe Bay Unit - WOA W-PAD Ma9netK Parameters Surface Location NAD2] Alasla Stale Planes, Zore 04, US Feel a ell neo MaEet: BGGM 2006 Dip: 60.883' Data: Novemtrer 30. 2006 N)01]5].1 ]9 Natkting. 5959836.00 kU5 rid Com'. .0.65435160' 6lat ~204 NORer. Rotary Ta61e 1615pk above MSL) Mag Dec. ¢23941' FS'. 5)6345nT Lon. W149533.t30 Easting: 61204900 kU5 Scale Facr. 09959143623 Plan: W-204L1 (P4t rvy Dare'. SegemGer 13, 3006 4000 O O O C 5000 U 6000 1000 2000 3000 4000 5000 6000 7000 8000 -204 (P8) lop Whipstock Base Whipstock ... .. -..-..-..-..-..-..-j.-..-..-..-..-..-..-..-.. y..-..-..-..-..-..-..-..-.. j..-..-..-..-..-..-..-..-..}..-..-..-..-..-..-..-..-. j-..-..-..-..-..-..-..-..-t.-..-..-..-..-..-..-..-..-j. -..-..-..-..-. ~a~~ ~~ ~~ KOP Crv 70/100 End Crv W-204Lt OBc Tgt 2 W-204L1 OBc Tgt 4; W-204L7 OBC Tgt 6 W204Lt;OBc T t 8 W- g 204L1 OBC Ygt 70 ...-..-.. .-..-.j- ......._.. _.. _.. _j._..-..-..-..-..-.. ..-.. y..-..-..-..-..-..-..-..-. ..-..-..-.._..-..-..-.-..}..-..-..-..-..-..-..-..-.t_..-..-. .-..-..-..-.._{.-.. ..-..-..-. .-j.-..-..-..-..-. Crv 6/100 End:Crv Crv 6/100 :End Crv Crv 61100 End Crv Cry 6/100 End Crv Crv lj/100 End Crv TD 14-4/2" Lnr ...-..-..-.. _.. _.._ .._ _. ._.. _n. _..-..-.._.._.. _. .-.. y..-..-..-..-.._..-.. -.._ ..-..-..-..-..~~ ..}..-..-..-..-..-..-..-..-.t_.. _.. ~._.~_..- .. _.. _.. ..y.-..-. .. ...-..-..-..-.._n_.._ ._. ._.. _,._.. ..-..-.. _.- .-..-.._..-.. _ _ _ _ - - ~ - - ~ -pp••_ - $( )4 175/6" C59 Pt End Crv Crv 6/100 End Crv j Crv 6/100 End Crv j nd Crv W 2S p ' W-j04L1 OBc Tgt 3 Crv 6/100 :End Cr Crv 6/100 E Crv 6/100 W-204L~ OBc Tgt 1 W-2D4L1 OBc Tgt 5 W-204L1 OBc Tgt 7 : YN-204L1 OBc Tgt 9 1000 2000 3000 4000 5000 6000 7000 8000 Vertical Section (ft) Azim = 1.52°, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-V 4000 X000 3000 • by Schlumberger WELL W-204L1 (P4) FIELD Prudhoe Bay Unit - WOA STRUCTURE W-PAD rele Parameters 6utlace L aation NP02] Alaska Stale Planes. Zone 04, U6 Feet Mlscella neouz Motlel: BGGM 2006 Oip: e0.88J° Date November b. 2006 Lal. N>01]b].I ]9 Northing 69598J600 flU5 Gritl GOnV ~0654J6a60' Slat'. W~204 ND Ref. Rotary cable l61.60Xabove MSLI Mag Oec' •?3941' FS'. 6]634.9 nT Len: W1495J31J0 Easnng. 61204900 flUS Gcale Fac[0.9999142622 Plan: W-204LI (P41 Srvy Date'. September 1J. 2006 -2000 -1000 0 1000 2000 8000 7000 6000 n n Z °0 5000 O C 0) f0 U N ~ 4000 V V V 3000 2000 1000 W-204L1 (P4) TD 14.1/2" Lnr : W-204 (PB) N End Crv W204L1 OBc Tgt 10 Crv 6/700 End Crv ..................:..................................j.... W=204L'1'OBG'Tgt 9.... .................................:..................................:............ Crv 6/700 Entl Crv W-204L7 OBC Tgt 8 Crv 6/100 End Crv W-204L7 OBC Tgt 7 Crv 6/100 End Crv W-20dL1 OBc Tgt 6 Crv 6/100 End Crv : W-204Li OBc Tgt 5 Crv 6/100 End Crv W-204L1 OBc Tgt 4 Crv 6/100 End Crv W-20dL1 OBC Tgt 3 Crv 6/100 ...................~.................................. i.................................. t.. ............................. ..................................~............ End Crv W-204Li OBC Tgt 2 Crv 6/100 End Crv W-204L7 OBC Tgt 1 Crv 6/100 7-5/8" Csg Pt End Crv KOP Crv 70/100 Base Whipstock ...................:..................................:....................Top•Whipstiick....... -.....................~.............................---..:............ W-204 ( 81 8000 7000 6000 5000 4000 3000 2000 1000 -2000 -1000 0 1000 2000 «< W Scale = 1(in):1000(ft) E »> BP Alaska Anticollision Report Company: BP Amoco Date: 9/13!2006 Time: 10:08:53 Page: Field: Prudhoe Bay Reference Site: PB W Pad Cn-ordinate(NE) Reference: Well: Plan W-204, Tr ue North Reference Well: Plan W-204 Vertical ("fVD) Reference: W-204 Plan 81.5 Reference Wellpath: Plan W-204L1 Db: Oracle ~ ~, NO GLOBAL SCAN: Using user defin ed selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM ~! ', Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse ', Depth Range: 5515.91 to 12 652.17 ft Scan Method: Trav Cylinder No rth Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 9/13/2006 Validated: No Version: 3 ', Planned From To Survey Toolcode Tool Name ', ft ft I 28.50 1000.00 Planned: Plan #8 V1 (0) GYD-GC-SS Gyrodata gyro single shots 1000.00 3346.00 Planned: P lan #8 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station 3346.00 5515.91 Planned: P lan #8 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station 5515.91 12652.17 Planned: Plan #4 V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Points iViD "l'VD diameter Hole Size Name ft ft in in ' 3345.57 3326.50 10.750 13.500 10 3/4" 10002.33 5131.50 7.625 9.875 7-5/8" ' 12652.17 5151.50 4.500 6.750 4-1/2" I Summary <_-___-_____ __ p ffset ~Veltpath - -------------> Reference Offset Ctr-Ctr No-Go ~#Ilowable _ Site Well Wellpath MD MD Distance :1reu Deviation Warning ft ft ft ft ft PB W Pad Plan W-202 Plan W-202 V3 Plan: W- 8666.67 6935.00 613.23 173.53 439.70 Pass: Major Risk PB W Pad Plan W-204 Plan W-204 V6 Plan: PI 7764.57 5515.00 0.00 0.73 -0.73 FAIL: NOERRORS PB W Pad Plan W-206 Plan W-206 V3 Plan: W- Out of range PB W Pad Plan W-208 Plan W-208 V2 Plan: W- 12600.75 10065.00 1593.70 494.88 1098.82 Pass: Major Risk '. PB W Pad Plan W-209 Plan W-209 V4 Plan: PI Out of range PB W Pad Plan W-210 Plan W-210 V5 Plan: PI Out of range ', PB W Pad Plan W-213 Plan W-213 V4 Plan: PI Out of range PB W Pad Plan W-214 Plan W-214 V5 Plan: PI 6857.27 5655.00 1346.11 110.98 1235.13 Pass: Major Risk ', PB W Pad Plan W-216 Plan W-216 V11 Plan: W 6961.09 6340.00 1091.01 111.39 979.62 Pass: Major Risk ', PB W Pad Plan W-217 Plan W-217 V3 Plan: W- 7339.76 5350.00 2375.74 153.79 2221.95 Pass: Major Risk PB W Pad Plan W-218 Plan W-218 V3 5515.91 30.00 5172.68 No Offset Stations ', ', PB W Pad Plan W-219 Plan W-219 V4 5515.91 30.00 5173.37 No Offset Stations ', PB W Pad Plan W-220 Plan W-220 V3 Plan: PI Out of range ', ', PB W Pad Plan W-220 Plan W-220L1 OBa V1 PI Out of range i PB W Pad Plan W-220 Plan W-220L2 OA V1 Pla Out of range PB W Pad Plan W-221 Plan W-221 VS Plan: W- 6072.74 3820.00 2649.35 60.99 2588.36 Pass: Major Risk ', PB W Pad Plan W-401 Plan W-401 V1 Plan: PI 7118.21 5517.16 1373.67 82.68 1290.99 Pass: Major Risk '~ PB W Pad W-01 W-01 V3 I Out of range i ~, PB W Pad W-01 W-01 A V4 Out of range PB W Pad W-01 W-01AP61 V1 Out of range ', PB W Pad W-02 W-02 V4 Out of range I PB W Pad W-02 W-02A V20 I Out of range PB W Pad W-03 W-03 V4 Out of range I PB W Pad W-03 W-03A V1 I Out of range PB W Pad W-04 W-04 V1 Out of range I, PB W Pad W-05 W-05 V3 Out of range ', PB W Pad W-05 W-05A V2 Out of range ~, ', PB W Pad W-06A W-06A V2 Out of range '~ ', PB W Pad W-06 W-O6 V1 Out of range ' PB W Pad W-07 W-07 V1 Out of range ', i PB W Pad W-07 W-07A V7 Out of range I, PB W Pad W-08 W-08 V1 Out of range ', ~, PB W Pad W-08 W-08A V12 Out of range ~~ '~~ PB W Pad W-09 W-09 V1 Out of range PB W Pad W-09 W-09A V4 Out of range II PB W Pad W-09 W-09AP61 V9 Out of range PB W Pad I W-10 W-10 V3 Out of range ~, ~ , PB W Pad W-10 W-10A V4 Out of range i ', PB W Pad W-11 W-11 V1 Out of range PB W Pad W-12A W-12A V3 Out of range 1 '~- _ ._--- -- - _- ------ - -- --- -____--. ' ~ BP Alaska Anticollision Report Gompan~: BP Amoco Date: 9!13/2006 'time: 10:08:53 Page: 2 field: Prudhoe Bay Reference Site: PB W Pad Cn-nrdinate(NE) Reference: Well: Plan W-204, Tr ue North Keference Well: Plan W-204 Vertical (TVD) Keference: W-204 Plan 81.5 Reference Wellpath: Plan W-204L1 Db: Oracle Sununan <-------------- O ffset Wellpath ------ --------> Referenc e Offset Ctr-Ctr No-Go Allowable Site Well Wellpath ~9D Y1D Distance Area Deviation Warning ft ft ft ft ft PB W Pad W-12 W-12 V1 Out of range PB W Pad W-15 W-15 V1 Out of range j PB W Pad W-15 W-15A V10 Out of range ' PB W Pad W-15 W-15PB1 V6 Out of range PB W Pad W-15 W-15P62 V1 Out of range ', PB W Pad W-16 W-16 V3 Out of range ', PB W Pad W-16 W-16A V3 Out of range ', PB W Pad W-16 W-16AP61 V1 Out of range ' PB W Pad W-16 W-16L1 V3 Out of range ', PB W Pad W-17 W-17 V4 Out of range ', PB W Pad W-17 W-17A V9 Out of range PB W Pad W-18 W-18 V1 Out of range ~ PB W Pad W-19 W-19 V2 5516.07 5595.00 924.94 91.52 833.43 Pass: Major Risk PB W Pad W-19 W-19A V1 5517.86 5590.00 925.44 91.55 833.88 Pass: Major Risk ', '! PB W Pad W-19 W-19AL1 V3 5517.86 5590.00 925.44 91.55 833.88 Pass: Major Risk PB W Pad W-19 W-19AL1 P61 V1 5517.86 5590.00 925.44 91.47 833.97 Pass: Major Risk PB W Pad W-19 W-19AL1 P62 V1 5517.86 5590.00 925.44 91.47 833.97 Pass: Major Risk ', PB W Pad W-200PB1 W-200P61 V7 Out of range PB W Pad W-200 W-200 V6 Out of range ', PB W Pad W-201 W-201 V4 5789.87 5290.00 2117.04 75.57 2041.47 Pass: Major Risk ', PB W Pad W-203 W-203 V10 Out of range ', ', PB W Pad W-203 W-203L1 V8 Out of range ~ PB W Pad W-203 W-203L2 V4 Out of range ', ', PB W Pad W-205 W-205 V6 6056.49 10670.00 4384.78 108.08 4276.69 Pass: Major Risk PB W Pad W-205 W-205L1 V2 6056.49 10680.00 4360.39 104.69 4255.70 Pass: Major Risk ', ', PB W Pad W-205 W-205L1 P61 V4 Out of range ', ', PB W Pad W-205 W-205L2 V4 6056.49 10670.00 4336.24 105.14 4231.10 Pass: Major Risk ', ', PB W Pad W-207 W-207 V10 Out of range ~, ~~, PB W Pad W-207 W-207P61 V2 Out of range PB W Pad W-209 W-209 V9 Out of range PB W Pad W-209 W-209P61 V6 Out of range ', PB W Pad W-20 W-20 V1 Out of range i PB W Pad W-211 W-211 V9 Out of range I~ PB W Pad W-212 W-212 V12 Out of range PB W Pad W-215 W-215 V7 5530.80 8720.00 6178.21 88.16 6090.05 Pass: Major Risk ~, PB W Pad W-215 W-215PB1 V2 Out of range ', PB W Pad W-21 W-21 V3 5515.91 6960.00 1697.64 64.42 1633.22 Pass: Major Risk PB W Pad W-21 W-21A V12 5515.91 6950.00 1697.23 64.42 1632.82 Pass: Major Risk PB W Pad W-22 W-22 V1 5515.91 7470.00 2347.37 59.73 2287.64 Pass: Major Risk PB W Pad W-23 W-23 V3 5516.53 5695.00 428.55 65.23 363.32 Pass: Major Risk PB W Pad W-23 W-23A V5 5516.34 5685.00 428.30 65.24 363.06 Pass: Major Risk ', PB W Pad W-24 W-24 V1 5515.91 7675.00 2747.08 55.00 2692.08 Pass: Major Risk ', PB W Pad W-25 W-25 V1 5515.91 7370.00 3114.58 87.43 3027.15 Pass: Major Risk ', ', PB W Pad W-26A W-26A V6 5830.59 5225.00 2661.15 107.44 2553.71 Pass: Major Risk ', ', PB W Pad W-26 W-26 V1 5830.58 5225.00 2661.14 107.44 2553.70 Pass: Major Risk ', PB W Pad W-27 W-27 V3 Out of range ', PB W Pad W-27 W-27A V3 Out of range ~, PB W Pad W-29 W-29 V1 5516.65 6165.00 1768.51 94.09 1674.42 Pass: Major Risk ~, PB W Pad W-30 W-30 V1 5515.91 9445.00 5265.89 75.30 5190.59 Pass: Major Risk '~ '~ PB W Pad W-31 W-31 V1 5515.91 8645.00 4845.30 273.96 4571.33 Pass: Major Risk ', ~, PB W Pad W-32 W-32 V6 5516.47 5865.00 1008.43 79.98 928.45 Pass: Major Risk ', ~ PB W Pad W-32 W-32A V3 5516.03 5860.00 1007.59 79.98 927.60 Pass: Major Risk PB W Pad W-32 W-32AP61 V13 5516.03 5860.00 1007.59 79.81 927.78 Pass: Major Risk ', PB W Pad W-34 W-34 V1 5515.91 10115.00 6120.55 278.38 5842.17 Pass: Major Risk ', PB W Pad W-34 W-34A V1 5515.91 10115.00 6120.55 278.38 5842.17 Pass: Major Risk PB W Pad W-34 W-34APB1 V1 5515.91 10115.00 6120.55 278.41 5842.14 Pass: Major Risk ', PB W Pad W-35 W-35 V1 Out of range ', PB W Pad W-36 W-36 V1 Out of range PB W Pad W-37 W-37 V3 Out of range PB W Pad W-37 W-37A V3 Out of range PB W Pad W-38 W-38 V2 Out of range PB W Pad W-38 W-38A V10 Out of range PB W Pad W-39 W-39 V1 Out of range BP Alaska Anticollision Report ~~ Company: BP Amaco Date: 9!13/2006 Time: 10:08:53 Page: 3 Field; Prudhoe Bay Reference Site: PB W Pad Co-ordinate(NE) Reference: Well: Plan W-204, True North Reference Nell: Plan W-204 Vertical (TVD) Reference: W-204 Plan 81.5 Reference Wellpath: Plan W-204L1 Db: Orade Summary <-------------- Offset W'ellpath ----- --------> Reference Offset Ctr-Cfr No-Go Allo~~~able ~ Sete Well Wellpath MD D1D Distance Area Deviation Warning ~t ft ft ft ft ft PB W Pad W-39 W-39A V2 Out of range PB W Pad W-400 W-400 V5 Out of range '; PB W Pad W-40 W-40 V1 Out of range PB W Pad W-42 W-42 V1 Out of range ~ PB W Pad W-44 W-44 V1 5515.91 10615.00 7501.02 110.16 7390.86 Pass: Major Risk it 157 150 100 50 0 2 50 100 150 157 • 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre - -- FieldPrudhoe Bay i Site PB W Pad Well:Plan W-204 !WellpathElan W-204L1 • • ~'~1~;S~II~'~':~L L~~"~'E~ ~'HE~'KL~ST `FELL ~;_~dtE ~~ ~~~ "' Pa-®# ~~... ~'9 i~ ®evelopment Service Exploratory Stratigraphic Vest Non-Conventional well Circle Appropriate Letter t Paragraphs to be Included in Transmittal Letter CHECK :ADD-Otis w' H.aT (OPTIOti S i :aPPL[ES TEXT FOR APPROVAL LETTER :vIL'LTI LATER.-~L The permit is for a new ,wey(Ibore~seg~ment oT existinJ weII1~~ l~~Z-T (If last tu~o digit; in Permit tio. .. ..aP[ tio. ~0-Q~~ -~ API number are ben~een 60-69) Production should continue to be reported a; a function of the ~~riginal API number stated above. PLOT HOLE In accordance with 20 .~.AC ~~.00~(E), all record;. data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and :4PI number (`0- - -_) from records, data and logs acquired for well SPAC[tiG EXCEPTIOti The permit is approved subject to ful[ compliance with ?0 AAC 2~.0~~ Approval to perforate and produce 'inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the !lability of any protest to the spacing exception that may occur. DRY D[TCH :-~I1 dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. ion-Conventional Please note the following special condition of this permit: :production or production testing of coal bed methane is not allowed well for (name of vvel~ until after (Company tiam~ has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company tiame) must contact the Commission to obtain advance approval of such water well testing Rev: 12.06 C 'jod~`trar.smittal checkist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, POLARIS OIL - 640160 _ _ __ __ Pro ______ ~~! -_ _. - -- - - PTD#:2061590 Company BP_EXPLORATION_(ALASKA) INC _ _ _ _ _ _ -__ _ Initial Class/Type _ _DEV ! 1-O_I_LII NGeoArea RUDHOE BAY UN POL W- Un ~ 1 - graOnlOff Shore On _ ___ Annlu aorD sposal I! ] Administration 1 Permitfee attached- Yes ~~2 Lease numberappropriate_ ------------- Yes 3 Unique well name and number _ _ Yes 4 Well located in a definedpool Yes 5 Well located proper distance_from_drilling unit_boundary_ _ _ _ Yes _ _ _ 6 Well located proper distance_from other wells _ _ Yes 7 Sufficient acreage available in drilling unit _ _ _ _ . _ _ Yes _ _ _ 8 If deviated, is_we_Ilbore plat-included _ _ _ _ _ _ Yes 9 Operator only affected party Yes 10 Operator has appropriate_bond in force _ Yes _ _ 11 Permit_can be issued without conservation order_ _ . _ - - _ _ _ _ _ Yes _ _ _ _ _ - _ _ _ _ X12 Permit_can be issued wdhout administrative_approya_I _ Yes _ _ Appr Date 13 - Can permit be approved before l5 day wait_ _ Yes RPC 11/21/2006 14 Well located within area and strata authorized by Injection Order# (put_1O# in_comments)_(for_ NA '~15 All wells within i14-mile area-of review identified (For service well Only) _ _ _ NA_ .. 16 Pre-produced. injector;. dur_at_ion of pre-p[oduction less than_3 months (For service well. only) NR_ '17 Nonconven. gas conforms to AS31 05,030Q.1.A),(~2.A-l)) - _ NA_ ____ - 18 -- - - -- Conducko[ stnng_provided NA Engineering 20 _ _ _ _ n ec s a Surface casing pro CMT_vol, adequate to circulate on conductor-& surf csg _ NA_ _ _ 21 CMT uoI_ adequ_ate-to tie-m ong string to surf csg_ _ _ _ _ NA_ 22 CMT-will cover all known productive horizgns No_ - Slotted.- 23 Casing designs adequate f_or C, T, B & permafr_ost_ Yes X24 Adequate Tankage or reserve pit Yes Nabors_7ES, 25 If a_re-drill, has a 1.0-403 for abandonment been approved _ _ NA_ _ - _ Lateral, _ _ _ _ _ 26 Adequatewellboreseparationproposed- - - - - Yes 27 If_diverter required, does it meet regulations_ ----- ---------- - NA_ _ _ _ _ Sidetrack. 28 Drilling fluid_program schematic &_equip list-adequate Yes Max MW 9.6 ppg. Pp 29 D BOPES, do they meet_ regulation Yes - _ WGA 12006 111 X30 BOPE_press rating appropriate; test to-(put prig m comments)_ Yes Test to 3500. psi. MSP 1750 psi._ 31 _Choke_manifold complies w/API_ RP-53 (May 84)- - - - - - - - -Yes 32 Work will occur without operation shutdown_ _ _ _ _ _ _ _ _ _ _ _ Yes _ 33 Is presence_of H2S gas probable _ _ _ _ . _ No _ _ Not an H2S pad. 34 Mechanical condition of wells within AOR verified (Forserwce well only) NA_ __ _ i35 __ - Permitcan be issued w!c hydrogen sulfide measures No_ Geology 36 Data presented on_ potential overpressure zones _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ _ 37 Seismic analysis of shallow gas_zones tJA- - _ _ Appr Date 38 Seabed condition survey_(if off-shore) - _ _ _ _ _ . NA_ ~ - RPC 11121!2006 'I39 Contact namelphone far weekly-progress reports_[exploratoryon1y] NA_ own USDWs ll k t t 19 • • Geologic Engineering Date Commissioner: Date: Co mission r: Date mi oner ~i f~~- ~~ Z/o,~ l~'L/-off _