Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout206-160Ima a Pro~ct Well History File Cov~age
9
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Q ~ - ~ ~ ~ Well History File Identifier
Two-sided III II'III II III II III ^ Rescan Needed III (III~I II II III III
Orgamzmg (done) ^
RES N DIGIT L DATA
Color Items: Diskettes, No.'
^ Greyscale Items: ^ Other, No/Type:
^ Poor Quality Originals:
^ Other:
NOTES:
QY: ~ Maria Date:
Project Proofing
gY: Maria Date: ~
Scanning Preparation _~,, x 30 =
gY: Maria Date:
Production Scanning
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
^ Other::
h, ~P
iiiuiuuiuii
+ =TOTAL PAGES~Q,~
(Count does not include cover sheet)
~ /s/
Stage 1 Page Count from Scanned File: ~ (Count does include co er sheet)
Page Count Matches Number in Scanning Preparation: YES NO
BY: Maria Date: ~ ~~ / ~ /s/ ~/ ~
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: /s/
this Dint unless rescanning is required. II I II IIII III II I I III
Scanning is complete at p
ReScanned III IIIIIIIIIII VIII
gY: Maria Date: /s/
G2uality Checked III IIIIIIIIIIIIIIII
Comments about this file:
10/6/2005 Well History File Cover Page doc
..
~; - .~~,~
,,.,~
~° ~ ~,.
"~
-~,~~
3 ~ ~ .. .,~.. .
MICROFILMED
6/30/2010
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
~ri
DATA SUBMITTAL COMPLIANCE REPORT
3/26/2009
Permit to Drill 2061600 Well Name/No. PRUDHOE BAY UN POL W-204L2 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23333-61-00
MD 12804 TVD 4967 Completion Date 3/1/2007 Completion Status 1-OIL Current Status 1-OIL UIC N
-- -
REQUIRED INFORMATION 1~~~.(
Mud Log No Samples N~ Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / RES / AZI DEN / NEU / AMI / PWD
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run
T Med/Frmt Number Name Scale Media No
Y
D D Asc
Directional Survey
C Las Dir~tional Survey
15495 /Density
QED C Lis 15593 Induction/Resistivity
4 i
~'~g
duction/Resistivity
Well CoreslSamples Information:
Interval
Name Start Stop
ADDITIONAL INFORMATION
Well Cored? Y /~
Chips Received? ,,LLA4..~
Analysis Y / N--
Received?
2 Blu 1
(data taken from Logs Portion of Master Well Data Maint
Interval OH /
Start Stop _ CH Received Comments
5258 12804 Open 3/13/2007
5258 12804 Open 3/13/2007
5406 12804 Open 10/3/2007 DCAV, DRHB, GR, NPHI,
ROBB, RPD w/PDS
graphic field data
108 12804 Open 10/26/2007 LIS Veri, GR, ROP, FET,
RPS, DRHO, NPHI, w/PDS
graphics
5378 12804 Open 10/26/2007 MD Vision Services 20-
Feb-2007
Sample
Set
Sent Received Number Comments
Daily History Received? ly"
Formation Tops
!I
DATA SUBMITTAL COMPLIANCE REPORT
3/26/2009
Permit to Drill 2061600 Well Name/No. PRUDHOE BAY UN POL W-204L2 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23333-57-00
MD 12804 TVD 4967 Completion Date 3/1/2007 Completion Status 1-OIL Current Status 1-OIL UIC N
Comments:
_ -_- - - _ -- - -- - __ - z_ - --- __
Compliance Reviewed By: - _ __ Date:
~
10/19107
ScMamUerger
Sehlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job tl
Log Description
NO.4454
Company: Alaska Oil 8 Gas Cons Comm
ANn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Orion
Borealis
Date 8L Color CD
W-213 11661175 MEM TEMPIPRESS SURVEY - 09/29/07 1
V-215
Z-108
5-124
S-125PB1
V-121
V-222
W-210 11594491
11212626
40014242
40015467
40015007
40015319
40014842 CH EDIT PDC GR USIT -
OH WIRELINE PEX EDIT `
OH MWDA.WD EDIT
OH MWDILWD EDIT
OH MWDILWD EDIT ~
OHMWD/LWDEDIT ~
OH MWDILWD EDIT - 04/23/07
02/05106
11105/06
07/07107
03124/07
O6/D8/07
02126/07
2
3
2
2
2
2 1
1
7
1
1
1
1
V-218
W-204 40015066
400/4637 OH MWDILWD EDIT -
OH MWDILWD EDIT 04107/07
01/29107 2
2 t
1
W-204PB7
W-204L1
W-204L2 40014637
40014637
40014637 OH MWDILWD EDIT
OH MWDILWD EDIT -
OH MWDILWD EDIT ~ 011241D7
02/07107
02/20/07 2
1
1 1
1
1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. _
Petrotechnical Data Center LR2-1 - -
900 E Benson Blvd. ""
Anchorage AK 99508-425q - -- "
Date Delivered !" "-~°" s, ~ t~"'
~ ~ s!f ~d It,fg
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2830
ATTN: Belh n
Received byl J( o/~~
Date 09-20-2007
Transmittal Number:92904
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
have anV Questions, please contact llouglas llortcn at the rli~ ac ono-4y t 3
Delivery Contents
1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells:
15A ao`~-vaa '~ ~Stl~r6
_ __
_ _.
1A c~0(o-tb~ -~, -~y~3 4t5~/1f`l
F-096ao~-o~3 ~ ~5y$5 _ _ _
F-42A coq'}- U~3 't i S~ISSty
L-204L1 ~~-pcj3 r t5~/~~
L-204L2 aU(o- bq ~/ ~ tS~/~'Sf
L-204L3 i~CXc-0~2S ~ t5~/g°t
V-205L1 ~U(o-1151 ~ lS~lcja
V-205L2 aU(o-1'Fra ~ t S~yCi3
W-204L1_c2UCo-/59 ~ t.'J S!°~~/ _
W-204L2_ ~U(o_-/fo O r' /~~/4.5
Please Sign and Return one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
i 5'
~~~~~ ~ STATE OF ALASKA
~'~~ MAY 1~L~~~OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil & Gas Cons. GORN111SSIOt1 Revised 05/09/07: Put on Production
1 a. Well Status: ®Oil ^ Gas gged ^ Abandoned ^ Suspended ^ WAG
zoAACZS.~os zoAACZS.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
03/01/2007
'"'~ 12. Permit to Drill Number
.x,120 -160
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
2/16/2007 13. API Number
50-029-23333-61-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
2/20/2007 14. Well Name and Number:
W-204L2
FEL, SEC. 21, T11N, R12E, UM
FSL, 1176
4859
Top of Productive Horizon:
665' FSL, 854' FEL, SEC. 16, T11 N, R12E, UM (OBa)
8. KB Elevation (ft):
81.52'
15. Field /Pool(s):
Prudhoe Bay Field /Polaris Pool
Total Depth:
2798' FSL, 877' FEL, SEC. 09, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD)
12804 + 4967
Ft
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 612049 y- 5959836 Zone- ASP4 10. Total Depth (MD+TVD)
12804 + 4967
Ft 16. Property Designation:
ADL 028261
TPI: x- 612353 y- 5960927 Zone- ASP4
- 5968338 Zone- ASP4
th: x- 612203
Total De 11. Depth where SSSV set
None MD 17. Land Use Permit:
y
p
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD / GR / RES / AZI DEN / NEU /AIM / PWD
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING' DEPTH MD SETTING DEPTH TVD f jOLE AMOUNT
SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
4-1/2" 12.6# L-80 5361' 12758' 4978' 4969' 6-3/4" Uncemented Slotted Liner
4-112" 12.6# L-80 5326' 5496' 4962' 5019' N/A N/A -Tieback Liner
23. Perforations open to Production (MD + TVD of Top and 24. TU81NG RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
4-1/2" Slotted Sections Reported on W-204
MD TVD MD TVD
6332' - 7369' 4991' - 4963'
10399' 4982' - 4943'
7913' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC,
-
10401' - 10525' 4943' - 4947' DEPTH INTERVAL MD AMOUNT S~ KIND OF MATERIAL USED
11017' - 12716' 4955' - 4971' 5366' Top of Window
~f
~,~" "
26. PRODUCTION TEST
Date First Production:
Reported on W-204 j// O?0~ Method of Operation (Flowing, Gas Lift, etc.): J,Sjj
See t-'~9~4 10-407 (Dated 12/27/06, PTD #206-092) for Production & Test Data
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
FIOW TUbing
PreSS. CaSing PreSSUre CALCULATED
24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
S f 5
Submit core chips; if none, state "none". ~~~' ''
L, .~ i ~O~i
None ~ ~~~
lfl
~ ~
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ~'~, MAC ~ ~ 207 ~M
~~~~~~L ~
~8. GEOLOGIC MARKER
s 29. ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
From W-204 None
Schrader Bluff OBa 5,342' 4,969'
From W-204L2
Schrader Bluff OBb 5,402' 4,994'
Schrader Bluff OBb 6,120' 4,998'
Schrader Bluff OBa 7652' 4,968'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. 1 hereby certify that the fore ing is true and correct to the best of my knowledge. e
O
/
7
J
~/~t~7
Signed Terrie Hubble Title Technical Assistant Date
W-204L2 206-160 Prepared eyName/Number. Terrie Hubble, 564-4628
Well Number Drilling Engineer: Ken Allen, 564-4366
Permit No. / A royal No.
INSTRUCTIONS
GeNeRn~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
heel 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
creel 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
heal 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
(real 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
(Teel 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITeM 27: If no cores taken, indicate "None".
ITeM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
f~.A 3 0 2007
WELL COMPLETION OR RECOMPLETION REPORT AND L G
~I~~F:~ A ~ Gas Gons. Cotnmissl0rt
flnrhnr»na
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAa,czs.~os zoAa,czs.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One 1b. Well Class: ~ "~~
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Dat Com Susp., or Ab
03/01/2007 12. Permit to Drill Number
206-160
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
2/16/2007 13. API Number
50-029-23333-61-00
4a. Location of Well (Governmental Section):
Surface: 7. Date T.D. Reached
2/20/2007 14. Well Name and Number:
W-204L2
4859' FSL, 1176' FEL, SEC. 21, T11N, R12E, UM
Top of Productive Horizon:
665' FSL, 854' FEL, SEC. 16, T11 N, R12E, UM (OBa)
8. KB Elevation (ft):
81.52'
15. Field /Pool(s):
Prudhoe Bay Field /Polaris Pool
Total Depth:
2798' FSL, 877' FEL, SEC. 09, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD)
12804 + 4967
Ft
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 612049 y- 5959836 Zone- ASP4 10. Total Depth (MD+TVD)
12804 + 4967
Ft 16. Property Designation:
ADL 028261
TPI: x- 612353 y- 5960927 Zone- ASP4
5968338 Zone- ASP4
612203
l D
h 11. Depth where SSSV set
None MD 17. Land Use Permit:
y-
: x-
Tota
ept rmafrost
f P
Thi
k
20
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL ness o
e
c
.
1900' (Approx.)
21. Logs Run: /~/ ofJ .3 Mp
MWD / GR / RES / AZI DEN / NEU /AIM / PWD
22, CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MO SETTING DEPTH. TVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING REGORD PULLED
4-1/2" 12.6# L-80 5361' 12758' 4978' 4969' 6-314" Uncemented Slotted Liner
4-1 /2" 12.6# L-80 5326' 5496' 4962' 5019' N/A N/A -Tieback Liner
23. Perforations open to Production (MD + TVD of Top and 24: TUBING RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
4-1/2" Slotted Sections Reported on W-204
MD TVD MD TVD
6332' - 7369' 4991' - 4963'
4943'
982'
'
' 25, ACID, FRACTURE, CEMENT SQUEEZE, ETC.
4
-
7913
- 10399
10401' - 10525' 4943' - 4947' DEPTH INTERVAL MD AMOUNT Si KIND OF MATERIAL USED
11017' - 12716' 4955' - 4971' 5366' Top of Window
2Ej, PRODUCTION TEST
Date First Production:
Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
FIOW TUbing
PreSS. CaSing PfeSSUre CALCULATED
24-I"IOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK)
27, CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, If necessa~r).
Submit core chips; if none, state "none". .` `~'"1
DD~~ ~~~g~~
None 6~~, Cpl? ~) 2~DI ; ,-...-_-------~:
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
t~
~(~1n1111__
28. GEOLOGIC MARKER 29. ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
Nanne MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
From W-204 None
Schrader Bluff OBa 5,342' 4,969'
From W-204L2
Schrader Bluff OBb 5,402' 4,994'
Schrader Bluff OBb 6,120' 4,998'
Schrader Bluff OBa 7652' 4,968'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge. q
~
~'r/~
Signed Terrie Hubble Title Technical Assistant Date
W-204L2 206-160 Prepared By Name/Number. Terrie Hubble, 564-4628
Well Number Drilling Engineer: Ken Allen, 564-4366
Permit No. / A royal No.
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITeM 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITeM 27: If no cores taken, indicate "None".
ITeM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
BP EXPLORATION Page 24 of 34
Operations Summary Report
~7st9~ l~
L~-
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
'Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date (From - To I Hours I Task I Code I NPT
~ 2/12/2007 ~ 11:00 - 12:30 ~ 1.50 ~ CASE ~ P
12:30 - 13:00 I 0.501 CASE I P
13:00 - 13:30 0.50 CASE P
13:30 - 16:00 2.50 CASE P
16:00 - 20:00 4.00 CASE P
20:00 - 21:00 1.00 CASE P
21:00 - 21:30 0.50 CASE P
21:30 - 00:00 2.50 CASE N
12/13/2007 100:00 - 01:30 I 1.50 I CASE I N
01:30 - 02:30 1.00 CASE P
02:30 - 05:00 2.50 CASE P
05:00 - 06:00 1.00 CASE P
06:00 - 09:30 3.50 CASE P
09:30 - 11:00 ( 1.501 CASE ~ P
11:00 - 14:00 3.00 CASE P
14:00 - 15:00 1.00 CASE P
15:00 - 15:30 0.50 CASE P
15:30 - 17:30 2.00 CASE P
17:30 - 18:00 0.50 STWHIP P
18:VV -G1:3V o.av JivV nlr r
21:30 - 23:00 1.50 STWHIP P
(2/14/2007 100:00 - 03:30 3.b0I STWHIP P
Phase ( Description of Operations
RUNPRD 62 Jts Slotted Liner -10388' - 7865'.
Swell Packer #3 - 7814' - 7794'.
8 Jts Solid Liner - 7783' - 7491'.
Swell Packer #4 - 7440' - 7420'.
34 Jts Slotted Liner - 7410' - 6141'.
9 Jts Solid Liner - 5989' - 5656'.
Swell Packer #5 - 5594' - 5574'.
Top of Hook Hanger - 5525'.
(166) 4.5" x 5.75" Free Floating Centralizers run.
RUNPRD Drop ball and pump down on seat. Pressure up to 3500 psi to
release from hook hanger. Ball sheared at 3998 psi.
RUNPRD Monitor well bore. Circulate bottoms up at 250 gpm, 1337 psi.
RUNPRD Monitor well bore. Pump dry job. Pull out of the hole to 1921'.
RUNPRD Lay down (27) 4-3/4" drill collars. Stand (3) 4-3/4" drill collars
and (9) HWDP in the derrick.
RUNPRD Lay down running tool and MW D slim pulse tool.
RUNPRD Clear and clean rig floor.
RREP RUNPRD Replace back up wrench on top drive.
Lost 13 bbls of SFOBM to well bore in 24 hrs.
RREP RUNPRD Replace back up wrench on top drive. Function test back up
wrench. Ok.
RUNPRD Rig up Nabors casing equipment.
RUNPRD Pick up LEM assembly.
RUNPRD Run in the hole with LEM assembly to 170'.
RUNPRD RIH w/ 9 stands of HWDP and continue w/4" drillpipe to 5579'.
MU topdrive & pump 1 bpm, 160 psi. Stage pumps up to 2
bpm, 320 psi, PU wt. 110K, SO wt 100K.
RUNPRD Tag Hook Hanger w/LEM muleshoe at 5524'. RIH. Wash
down slowly to remove debris f/lower seal bore extension. Run
seals into seal bore extension at 5631'. RIH until muleshoe is
at 5641'. See LEM orient and lock in. SO 15K on Hook. PU
10K over string wt to 120K to verify collet latch in. Drop 1-3/4"
Baker ball and pump to seat. Pressure to 3800 psi. Felt
packer set at 2000 psi. HR running tool shear went at 2800 psi.
Released f/LEM. Tested annulus to 1500 psi and held f/5
minutes indicating seals on ZXP packer properly placed and
holding pressure. Pull one stand and pump dry job. Blow
down top drive and lines.
Top of OBc lateral #1 LEM (liner top) at 5468'.
RUNPRD POH w/running tools f/5468' to 1087'.
RUNPRD Service topdrive. PJSM w/written THA. Slip and cut 84' of
drilling line.
RUNPRD POH to LEM HR running tool.
RUNPRD LD HR running tool assy and 2 3/8" inner string.
WEXIT Load Whipstock equipment in pipeshed and RU to run OBa
WEXIT PJSM. RIH w/ drill collars and HWDP to 1225'. Surface test
MWD 250gpm, 887 psi.
WEXIT RIH Whipstock and millimg HBA on 4" drill pipe to 2659'.
WEXIT RIH f/2659'. PU wt 112K, SO wt. 100K. Orient Whipstock to 22
Printed: 3/5/2007 7:03:14 AM
BP EXPLORATION Page 25 of 34
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
2/14/2007 00:00 - 03:30 3.50 STWHIP P WEXIT deg. left of high side at 5438', 30' above OBc liner top. RIH
slowly and tag up on liner top at 5468'. SO 15K and see pins
shear on bottom trip anchor. Pull 10K over to 122K. Anchor
set. SO and see release pin shear running tool free ~,
f/Whipstock tray w/35K slacked off on pin. Top of whipstock
set at 5,366' MD.
03:30 - 03:45 0.25 STWHIP P WEXIT RU and test above seals to surface to 1500 psi for 5 minutes.
OK.
03:45 - 05:00 i 1.25 STWHIP P WEXIT Swap out mud system f/SFOBM to LSOBM 252 gpm, 1445 psi.
05:00 - 06:00 1.00 STWHIP P WEXIT RU to mill window in 7 5/8" casing for OBa L-2 lateral.
06:00 - 11:00 5.00 STWHIP N RREP WEXIT Repair top drive rpm limiter proximity switch. During repairs
the hydraulis systen on the Top Drive was locked out and not
circulating. After completing the repairs the hydraulic oil
system was started and the thick cold oil blew the seals on the
filter. Replace seals and filter.
11:00 - 19:00 8.00 STWHIP P WEXIT Mill window w/BHA #10 w/ 6-1/8" window mill, 6-5/16" OD lower
watermelon window mill, flex jt., 6.75" upper watermelon
window mill, float sub, 1 jt HWDP, MWD, Lub bumper sub, 6
4-3/4" drill collars, XO, 27 jts. 4" HWDP, drill pipe to surface.
252 gpm, 1375 psi, 7K WOB, 96 rpm, 4K tq. on, 3K tq. off,
115K PU, 110K SO, 100 ROT. MW = 9.0 LSOBM.
Drill open hole f/5378' to 5398'.
TOW = 5366'
BOW= 5378'
19:00 - 20:00 1.00 STWHIP P WEXIT Circulate one 30 bbl Hi-Vis rabbit hair Super Sweep around
and see small amount of cuttings across shakers. 269 gpm,
1557 psi, 100 rpm.
Total of 185 # metal returned to surface while milling and
circulating.
20:00 - 21:00 1.00 STWHIP P WEXIT Work 6.75" OD upper mill up and back through window w/no
pumps several times w/no drag or overpull.
21:00 - 22:30 1.50 STWHIP P WEXIT Monitor well. POH to HWDP at 1197'. MW = 9.0 ppg.
22:30 - 00:00 1.50 STWHIP P WEXIT Stand back HWDP and drill collars.
2/15/2007 00:00 - 01:00 1.00 STWHIP P WEXIT PJSM. LD BHA # 10. Note: Upper string mill in gage. Did not
show much wear.
01:00 - 01:30 0.50 STWHIP P WEXIT LD and clear BHA #10 f/floor.
01:30 - 02:00 0.50 STWHIP P WEXIT MU jetting tool and clean out metal cuttings and debris f/stack.
02:00 - 03:00 1.00 BOPSU P WEXIT RU f/BOP test.
03:00 - 11:00 8.00 BOPSU P WEXIT BOP test 250 psi low pressure, 3500 psi high pressure. Tested
w/4" test jt. and 4.5" test jt. AOGCC represented by Lou
Grimaldi. Test witnessed by Lenward ToussanUChris Weaver
Nabors and Lowell Anderson/Duncan Ferguson BP.
11:00 - 12:00 1.00 BOPSU P WEXIT RD all BOP test equipment and clear floor, blow down all lines,
service top drive.
12:00 - 13:00 1.00 BOPSU P WEXIT Pull test plug. Set wear bushing.
13:00 - 14:30 1.50 BOPSU N RREP WEXIT Repair Koomey bleed off valve.
14:30 - 17:00 2.50 DRILL P WEXIT MU BHA. PJSM w/Schlumberger and all hands on handling
nukes. Load nukes.
17:00 - 19:30 2.50 DRILL P WEXIT RIH w/4" drillpipe to 1190'. Shallow test MWD. RIH to 4918'
19:30 - 20:30 1.00 DRILL P WEXIT Fill pipe and move 11 stands HWDP in derrick Hoff drillers side
to drillers side.
rnntea: siacwi ..w..»..~.~
~ s
BP EXPLORATION Page 26 of 34 ~
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: ~ 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date I From - To I Hours I Task I Code I NPT I Phase
2/15/2007 120:30 - 21:00 I 0.50 I DRILL I P I I W EXIT
21:00 - 22:00 I 1.001 DRILL I N I RREP I W EXIT
22:00 - 22:30 0.50 DRILL P I W EXIT
22:30 - 00:00 1.50 DRILL P
12/16/2007 00:00 - 03:00 3.00 DRILL N DPRB WEXIT
03:00 - 05:00 2.00 DRILL N DPRB WEXIT
05:00 - 07:00 2.001 DRILL N ~ DPRB ~ WEXIT
07:00 - 09:30 2.50 DRILL N DPRB WEXIT
09:30 - 11:00 1.50 DRILL N DPRB WEXIT
11:00 - 11:30 I 0.501 DRILL I N I DPRB I WEXIT
Description of Operations
RIH to 5345' and perform ECD benchmark to 9.21 ppg w/out
rotation.
Top drive rpm not reading on display. Call rig electrician to
adjust rpm proximity switch.
Continue w/ ECD benchmark.
Attempt to work bit through window as follows:
TOW = 5366' BOW = 5378'
Orient tool face.
5305' Confirm bit depth w/tally.
5335' Orient high side.
5366' Top of whipstock. Not felt. No weight on bit.
5380' 8K WOB. PU 15' try again.
5380' SO 10K WOB. PU and try again.
5380' 8K WOB. Turn 1/4 turn to right. No increase in torque.
Same WOB.
5380' PU try again. Increase WOB to 10K, 15K, 20K. PU 20'.
5360' Establish baseline pump pressure/torque 138 gpm =
597 psi. 5 rpm 2/1 K tq.
5380' SO and tag up. Pump 78 gpm, 713 psi. 5 rpm 3K tq.
Bit not fuming, motor stalled.
5360' PU and orient motor to low side.
5366' Tag up on top of whipstock can't go down. 5K WOB.
PU 10' orient to high side.
5374' SO to middle of tray and reorient to low side.
5380' SO to bottom of window 10K WOB.
5360' PU above tray and pump 100 gpm, rotate 5 rpm. Bit
free, motor doesn't stall.
5380' SO and start pumps and attempt rotation. Bit stalls.
Torque increases 1 K pressure increases 200 psi. Pick up
slightly and slack back off try process again.
5380' Increase SO wt. w/out pumps and w/out rotation to 30K.
No improvement.
Rig team discussed situation. Baker notified. 6.75"
watermelon mill w/starter mill assembly mobilized.
POH to BHA 239'. MW = 9.1 ppg.
PJSM on handling nukes. Work BHA. Unload nukes. LD BHA
#11.
PU window mill/cleanout BHA # 12 consisting of 6.156" window
starter mill, bit sub, 6.75" upper string mill, 4.75" bumper sub,
4.75" oil jars, float sub, 3 stands 4.75" drill collars.
RIH to 5366'.
Dress window 5366' to 5378' and clean out down to 5394'. PU
= 105K, SO = 98K, ROT = 100K, 253 gpm, 1011 psi, 84 rpm,
2K tq. Work mills TOW/5366' to BOW/5378' and down into OH
to 5394'. Pull up above TOW and run mills through window
w/no rotation and no pumps. 2K drag up and down as mills
moved across whipstock tray into OH f/5366' into OH down to
5372'.
Pump dry job and blow down top drive.
Printed: 3/5/2007 7:03:74 Ann
PROD3
BP EXPLORATION Page 27 of 34
Operations Summary Report
'..Legal Well Name: W-204
Common Well Name: W-204
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 7ES
Date From - To Hours Task Code NPT
Spud Date: 12/29/2006
Start: 12/29/2006 End: 3/1 /2007
Rig Release: 3/1/2007
Rig Number:
Phase ~ Description of Operations _ _ -
2/16/2007 11:30 - 14:15 2.75 DRILL N DPRB WEXIT
14:15 - 15:30 1.25 DRILL N DPRB WEXIT
15:30 - 18:30 3.00 DRILL N DPRB WEXIT
18:30 - 21:30
21:30 - 22:00
3.00 DRILL N
0.50 DRILL N
DPRB WEXIT
DPRB WEXIT
$Qud LZ 22:00 - oo:oo
2.001 DRILL I P
12/17/2007 100:00 - 12:00 I 12.001 DRILL I P
12:00 - 00:00 I 12.001 DRILL I P
12/18/2007 100:00 - 12:00 I 12.001 DRILL I P
12:00 - 00:00 I 12.001 DRILL I P
12!19/2007 100:00 - 12:00 1 12.001 DRILL I P
12:00 - 00:00 I 12.001 DRILL I P
POH f/5394' to BHA at 341'.
Stand back drill collars, LD milling BHA # 12. Mills showing
slight wear. Check upper sting mill gage. OK.
PJSM on nuke safety. PU drilling BHA # 13
w/DSX146H+GJUW rerun ser. # 109570, 1.50 deg. XP AIM
motor, bypass sub, NM stabilizer, NM flex lead collar, MWD,
VPWD, ADN, 3 NM Flex drill collars, hyd. jars, 80 stds 4" DP,
27 jnts. 4" HWDP, XO, 6 jts spiral 4" HWDP, XO to 4" drill pipe.
Load nukes.
RIH to 5305'.
Orient motor and ease down through window w/no trouble.
See slight tick at 5378'.
Drill f/5397' to 5463'. PU 105K, SO 95K, sliding, 2325 psi on,
2240 psi off, 295 gpm.
ADT = 1.2 hrs f/day. AST = 1/2 hrs f/day. Total footage f/day
= 66'.
PROD3 Directionally drill f/5463' to 6166'. PU 110K, SO 90, ROT 100,
rpm 60, 4K tq. on, 3K tq. off, 300 gpm, 2360 psi on, 2240 psi
off, 4K WOB. ECDs 9.81 calculated, 10.23 actual.
Backreaming each stand, surveys every 30'. Pumped 0 sweeps
f/12 hrs.
PROD3 Directionally drill f/6166' to 7250'. PU 108K, SO 85, ROT 90,
rpm 60, 4K tq. on, 3K tq. off, 300 gpm, 2574 psi on, 2488 psi
off, 5K WOB. ECDs 10.02 calculated, 10.33 actual.
Backreaming each stand, surveys every 30'. Pumped 0 sweeps
f/24 hrs.
ADT f/24 hrs. = 13.24. ART = 6.4 hrs. AST = 6.84 Progress
f/24 hrs. = 1787'. MW = 9.1ppg.
PROD3 Directionally drill f/7250' to 8217'. PU 115K, SO 93, ROT 100,
rpm 60, 5K tq. on, 4K tq. off, 300 gpm, 2410 psi on, 2610 psi
off, 5K WOB. ECDs 10.23 calculated, 10.45 actual.
Backreaming each joint, surveys every 30'. Pumped 0 sweeps
in 12 hrs. MW = 9.1 ppg.
PROD3 Directionally drill f/8217' to 9076'. PU 125K, SO 90, ROT 100,
rpm 60, 5K tq. on, 4K tq. off, 302 gpm, 2960 psi on, 2743 psi
off, 4K WOB. ECDs 10.25 calculated, 10.31 actual.
Backreaming each joint, surveys every 30'. Pumped 0 sweeps
in 12 hrs. Performed top drive maintenance at connection
breaks.
ADT f/24 hrs. = 11.99 hrs. AST = 4.1 hrs. ART = 7.89 hrs.
Progress = 1826' f/24 hrs. MW = 9.0 ppg.
PROD3 Directionally drill f/9076' to 10415'. PU 130K, SO 85, ROT 105,
rpm 60, 7K tq. on, 5.5K tq. off, 302 gpm, 3140 psi on, 2960 psi
off, 5-8K WOB. ECDs 10.40 calculated, 10.57 actual.
Backreaming each joint, surveys every 30'. Pumped 0 sweeps
in 12 hrs. Performed top drive maintenance at connection
breaks.
PROD3 Directionally drill f/10415' to 11083'. PU 135K, SO 80, ROT
102, rpm 60, 6K tq. on, 5K tq. off, 305 gpm, 3211 psi on, 3120
psi off, 6-5K WOB. ECDs 10.37 calculated, 10.5 actual.
Printed: 3/5/2UU7 7:UJ:74 AM
~ ~
BP EXPLORATION Page 28 of 34 ~
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: 12!29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2/19/2007 12:00 - 00:00 12.00 DRILL P PRODS Backreaming each joint, surveys every 30'. Performed top
drive maintenance at connection breaks. Experienced excess
erratic drag at 10892' causing difficulty w/sliding.
Circulated/rotated a 20 bbl., weighted, Safe Carb 250 sweep
around. 60 rpm, 305 gpm. Saw large slugs of sand w/the
carbonate across the shakers. Erratic drag disappeared.
Began sliding w/no difficulty.
ADT f/24 hrs. = 11.67 hrs. AST = 5.77 hrs. ART = 5.9 hrs.
Progress = 2007 f/24 hrs.
2/20/2007 00:00 - 12:00 12.00 DRILL P PRODS Directionally drill f/11083' to 12452'. PU 140K, SO 67, ROT
103, rpm 60, 9K tq. on,7.5K tq. off, 300 gpm, 3260 psi on,
3160 psi off, 5K WOB. ECDs 10.53 calculated, 10.82 actual.
Backreaming each joint, surveys every 30'.
12:00 - 15:30 3.50 DRILL P PRODS Directionally drill f/12452' to 12804' and TD lateral # 2 per
geos. PU 140K, SO 55, ROT 98, rpm 60, 8K tq. on, 6K tq. off,
302 gpm, 3452 psi on, 3325 psi off, 4K WOB. ECDs 10.57
calculated, 10.89 actual. Backreaming each joint, surveys
~ every 30'.
ADT f/24 hrs. = 7.24 AST = 1.78 ART = 5.46 1721 Progress
f/24 hrs. = 1721'
15:30 - 15:45 0.25 DRILL P PRODS Circulate 302 gpm, 60 rpm, reciprocating w/20' strokes, 3325
psi f/15 mins.
15:45 - 16:30 0.75 DRILL P PRODS Downlink MWD.
16:30 - 16:45 0.25 DRILL P PRODS Monitor well. MW = 9.0 ppg.
16:45 - 00:00 7.25 DRILL P PRODS MADPass/backream (/12804' to 11079', 298 gpm, 2960 psi, 60
rpm, 5K tq. 600'/min.
2/21/2007 00:00 - 19:00 19.00 DRILL P PRODS MADPass/backream f/11079' to 5385'. Pump 300 gpm. Log
packer seats w/high resolution Downlink mode as follows:
11050'-10900' 1st 60' at 150'lhr. next 90' at 300'/hr,
10650'-10500' at 300'/hr, 8000' to 7850' at 300' to 600' hr. 7450'
to 7300' at 600'/hr, 6350' to 6200' at 600'/hr, 5530' to 5385' at
300'/hr. and 600'/min rest of wellbore per geos.
19:00 - 20:15 1.25 DRILL P PRODS POH oriented 5 deg. right of high side and wash f/5508' to
5401'. 400 psi packoff and 10K drag at 5501'. 400 psi
packdoff and 10K drag at 5476'. 15K drag at 5449' w/no
packoff_
20:15 - 20:30 0.25 DRILL P PRODS POH oriented 5 deg. right of high side f/5401' to 5302', bha
pulled through window w/occasional overpull of 5K to 10K.
20:30 - 21:15 0.75 DRILL P PRODS Circulate/reciprocate w/no rotation between 5305' and 5205',
305 gpm, 1996 psi, 105K UP, 95K SO. Took a large amount of
shale across shakers during circulation. Circulate 341 bbls.
until clean across shakers.
21:15 - 22:00 0.75 DRILL P PRODS PJSM. Cut and slip 143' drilling line.
22:00 - 23:00 1.00 DRILL P PRODS Service topdrive.
23:00 - 00:00 1.00 DRILL P PRODS Orient 11 deg. right of high side. RIH f/5305' to 5970'. 5K
drag w/bha going out window w/bit at 5370', 5379' and 5419'.
2/22/2007 00:00 - 03:00 3.00 DRILL P PRODS RIH w/drilling BHA (/5970' to 12708'. No problems RIH.
03:00 - 04:00 1.00 DRILL P PRODS Wash down last stand to 12,804' and CBU rotating 80 rpm, 300
gpm, 3350 psi. Nothing across shakers at bottoms up. Empty
and clean pits. Load pits w/solids free MOBM.
Printed: 3/5/2007 7:03:14 AM
BP EXPLORATION Page 29 of 34 ~
Operations Summary Report
Legal Well
Common W
Event Name
Contractor N
Rig Name:
Date Name:
ell Name:
: D
ame: N
N
From - To W-204
W-204
RILL+C
ABOBS
ABOBS
Hours
OMPLE
ALASK
7ES
Task
TE
A DRI
Code
LING
NPT
Start
I Rig R
Rig N
Phase
Spud Date: 12/29/2006
: 12/29/2006 End: 3/1/2007
elease: 3/1/2007
umber:
Description of Operations
2/22/2007 04:00 - 06:00 2.00 DRILL P PROD3 Circulate clean solids free MOBM surface to surface rotating 80
rpm, 300 gpm, 3300 psi.
06:00 - 12:00 6.00 DRILL P PROD3 Monitor well. MW = 9.00 ppg. POH f/12804' to 5320'. No hole
problems coming to window. No problems coming through
window.
12:00 - 15:00 3.00 DRILL P PROD3 POH to BHA at 235'.
15:00 - 17:00 2.00 DRILL P PROD3 PJSM on nuke safety w/all hands, Schlumberger, toolpusher,
WSL. Remove nukes. LD BHA.
~ 17:00 - 18:00 1.00 WHIP P RUNPRD PJSM w/all hands and Baker rep. PU whipstock retrieving
BHA w/whipstock retrieving tool, float sub, 1 jt. 3-1/2" HWDP,
4-3/4" Bowen LBS, 4-3/4" Bowen Oil Jars, MWD, 97.52' OAL.
18:00 - 21:00 3.00 WHIP P RUNPRD PU and RIH 36 4-3/4" drill collars, XO sub, 27 jts. 4" HWDP.
21:00 - 22:15 1.25 WHIP P RUNPRD RIH w/4" drill pipe to 5292'.
22:15 - 22:45 0.50 WHIP P RUNPRD Check parameters: 130K UP, 115K SO w/out pumps. 135K
UP, 118K SO w/pumps 230 gpm, 1700 psi. Orient 160 deg.
right to place retriever lug up and away f/retrieving slot in tray
and wash down past top of retrieving slot, pull above slot,
orient to 21 deg. left, slack off and see tool engage slot at 5371'
w/15K down. PU and pull 20K over string wt. then slack 15K
down, on tool. PU and pull 30K over string wt. and shear
unloader. PU and pull 80K over string wt. and shear anchor.
Lost 8 bbls. to the formation. PU to 5358'. 135K UP, 117K
SO.
22:45 - 23:30 0.75 WHIP P RUNPRD CBU 235 gpm, 1720 psi. No metal or formation material
across shakers at bottoms up.
23:30 - 00:00 0.50 WHIP P RUNPRD RU to POH. Monitor well. MW = 9.0 ppg. Pump dry job. BD
top drive.
2/23/2007 00:00 - 02:00 2.00 WHIP P RUNPRD POH to BHA. Stand back collars and HWDP. MW = 9.0 ppg.
02:00 - 03:00 1.00 WHIP P RUNPRD Rack back 12 stands 4-3/4" drill pipe.
03:00 - 04:30 1.50 WHIP P RUNPRD LD whipstock fishing BHA. Whipstock tray in good condition.
Evidence of good mill contact f/complete 13.0' of tray. No
evidence of having milled off early. Mill ground off slight
amount of metal right side edge lower third of whipstock.
Bottom trip anchor slips in good condition. Function test rams.
04:30 - 06:30 2.00 CASE P RUNPRD PJSM w/Baker and casing crew. RU to RIH w/L-2 4-1/2" L-80
12.6# IBT-Mod/BTC-Mod slotted/solid production liner.
06:30 - 17:30 11.00 CASE N DPRB RUNPRD RIH to window at 5378'. Avg. IBT tq. = 3800 ft/Ib, avg. BTC
tq. = 4100 ft./Ibs. PU = 82K, SO = 73K. Position pipe above
window move slowly down. Exit window wino problems. Work
centralizer hanging up through window at 6280'. Work pipe
and get through window. Took wt. again at 6399' and worked
through window. Took wt again at 6519'. Worked pipe for 1
hour and could not get through window. Jt. # 27 at window.
Consult w/town team and establish maximum slack off of 20K.
Worked pipe for one hr. and could not get out window.
17:30 - 00:00 6.50 CASE N DPRB RUNPRD Consult w/town team. PJSM. MW = 9.0 ppg. POH laying
down f/6519' to 2756' w/liner and Swell Packers. Place Swell
Packers in cold on rack outside rig.
2/24/2007 00:00 - 02:00 2.00 CASE N DPRB RUNPRD POH f/2756' to 1137' and find centralizer on jt. 27 w/damage to
vanes and slightly egged. This is centralizer that stopped
progress. Find Jt. 24 centralizer egged. Flind Jt. 20
centralizer egged.
Printed: 3/5/2007 7:03:14 AM
BP EXPLORATION Page 30 of 34
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3!1/2007
Rig Name: NABOBS 7ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
_ _~ ___._
2/24/2007 02:00 - 03:00 1.00 CASE N DPRB RUNPRD POH and lay down bent jt.
03:00 - 03:30 0.50 CASE N DPRB RUNPRD RD liner running equipment and clear rig floor.
03:30 - 05:00 1.50 CASE N DPRB RUNPRD PU window dressing BHA # 15 w/3.5" IF bullnose, XO sub, 1
bent jt. of 4" HT-40 w/3 degree bend (10.5" of deflection at
16.75'), 6 jts. 4" HWDP, XO sub, Float Sub, NM flex collar, #1
6.75" upper window mill, #2 6.75" upper window mill, NM flex
collar, MW D, 4.75" Bowen LBS, 4.75" Bowen Oil Jars, six 4.75"
drill collars, XO sub, 21 jts. HWDP.
05:00 - 07:00 2.00 CASE N DPRB RUNPRD RIH to 5274'.
07:00 - 10:30 3.50 CASE N DPRB RUNPRD Orient 140 deg. right to enter motherbore below window. RIH
f/5274' and tag up at bottom of ZXP extension sleeve at 5478'.
Spot 130 vis pill from L-1 liner top at 5478' to window @ 5378'.
PU 115K, SO 103K. Attempt window exit w/bent jt. oriented
30, 20, 10 deg left. Tag up each time at 5478' in extension
sleeve of ZXP packer on L-1 liner top. POH to 5383' below L-2
window. Pump 80 gpm, 275 psi, ROT wt. 115. PU to 5366'.
Kill pumps and RIH. Tag up at 5478'. POH to 5383' and rotate
at 5 rpm, tq. 2.5. PU rotating to 5376' and stall rotary. Shut
down pumps. RIH and tag up at 5478'. Repeat same and tag
up at 5478'. POH to 5375' and take two rnds. left hand torque
w/bent jt. in mid window. RIH and tag up in L-1 liner top at
5478'. PU to 5365'. Rotate at 19 rpm and SO to 5385'. RIH
and tag up at 5478'.
10:30 - 11:30 1.00 CASE N DPRB RUNPRD POH to 5366' and CBU, 230 gpm, 1400 psi. Monitor well.
11:30 - 14:00 2.50 CASE N DPRB RUNPRD PUMP dry job. POH to BHA at 1115. MW = 9.0 ppg. Consult
w/town team.
14:00 - 15:30 1.50 CASE N DPRB RUNPRD LD window dress mill BHA # 15. Function test BOP.
15:30 - 17:30 2.00 CASE P RUNPRD Service rig, top drive, mobilize 3-1/2" IF jt. f/Tuboscope. PJSM
w/all hands and Baker reps. Bend 3.5" IF jt. 10" deflection
f/center at 15' to match Baker specifications.
17:30 - 19:00 1.50 CASE N DPRB RUNPRD PU window dressing BHA # 16 w/3.5" IF bullnose, 1 bent jt. of
3.5" IF w/10" of deflection at 15', XO sub, 6 jts. 4" HWDP, XO
sub, Float Sub, NM flex collar, #1 6.75" upper window mill, #2
6.75" upper window mill, NM flex collar, MW D, 4.75" Bowen
LBS, 4.75" Bowen Oil Jars, six 4.75" drill collars, XO sub, 21
jts. HWDP. Test MWD at 1164'. 250 gpm, 775 psi.
19:00 - 21:00 2.00 CASE N DPRB RUNPRD RIH to 5273'. Install blower hose.
21:00 - 21:30 0.50 CASE N DPRB RUNPRD Circulate 220 gpm, 1025 psi, 22 deg. left. UP 110K, SO 102K.
SD pumps and RIH. Tag up 10' deeper than previous BHA #
15w/4.5" jt. 3.5" bullnose entered L-1 liner top to XO below
ZXP at 5488'. POH to 5467' and rotate pipe 45 deg. right.
Attempt to enter window. Tag up on L-1 liner top at 5488'.
POH to 5467'. Rotate pipe 45 deg right, try moving down past
window f/5378' to 5380' w/pumps, 112 gpm, 1625 psi. SD
pump RIH. Tag up at 5488'. POH to 5365' turn on pumps 112
gpm, 1625 psi, rotate 5 rpm and RIH 5'/min through window to
5385'. SD pumps and RIH. Tag up at 5488'. POH to center of
window at 5373'. Rotate very slowly w/pumps 110 gpm, 1605
psi., tq. 1.7K. Torque up to 5.6K. Trap torque and SO slowly
to 5382'. SD pumps and RIH to 5495'. Exit window.
21:30 - 00:00 2.50 CASE N DPRB RUNPRD RIH and position mills across window tagging up w/lower mill at
5373'. Mill w/25 rpm, 170 gpm, 610 psi, 3.5K tq. f/5373' to
5395' in OH. POH to 5366' and ream hole w/mills f/5366' to
Printed: 3/5/2007 /:U3:14 AM
BP EXPLORATION Page 31 of 34 ~
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 3/1/2007
,Rig Name: NABOBS 7ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2/24/2007 21:30 - 00:00 2.50 CASE N DPRB RUNPRD 5395'. After reaming attempt to RIH and tag up hard at 5648'.
Had trouble finding hole. Work through problem area
w/pumps 120 gpm, 1650 psi to 5654' (8' deeper than bullnose
penetrated during reaming process).
2/25/2007 00:00 - 00:30 0.50 CASE N DPRB RUNPRD POH f/5654' in L-2 OH to 5365' above window. Orient w/MWD
to low side w/bent jt. RIH washing down. Tag up at 5488' on
L-1 liner top.
00:30 - 01:30 1.00 CASE N DPRB RUNPRD PU to 5486' and circulate 20 bbl. Hi-Vis sweep around, 220
gpm, 1620 psi. No cuttings or junk returned across shakers.
01:30 - 03:30 2.00 CASE N DPRB RUNPRD POH f/5486' to BHA #16 at 1115'. MW = 9.0
03:30 - 04:30 1.00 CASE N DPRB RUNPRD LD BHA #16. Function test rams. Clear floor.
04:30 - 06:00 1.50 CASE N DPRB RUNPRD PJSM w/service hands, crew, WSL. RU to RIH w/4.5" 12.60#
BTC-M/IBT-M, L-80, L-2 production liner.
06:00 - 13:00 7.00 CASE P RUNPRD RIH past window and tag up at L-1 liner top at 5485'.
13:00 - 14:30 1.50 CASE P RUNPRD POH above liner top to 5360'. Orient 90 deg. further to right
and attempt to enter window. RIH and tag up at 5485'. POH
above liner top to 5360' and orient another 90 deg. to right.
RIH and tag up at 5485'. POH above liner top to 5360' and
orient 90 deg. right. SO and enter L-2 window successfully.
14:30 - 18:30 4.00 CASE P RUNPRD RIH f/5366' to 7366'. No problems f/Hydroform centralizers.
18:30 - 19:30 1.00 CASE P RUNPRD MU space out pups. RU MWD equipment. MU HOOK Hanger
Assy. PU 85K, SO 73K.
19:30 - 00:00 4.50 CASE P RUNPRD RD casing running equipment. RIH w/9 stands HWDP.
Shallow test MW D at 8212', 120 gpm, 900 psi. Cont. RIH w/12
stands 4.75" drill collars. RIH w/drill pipe to 12288' w/ shoe.
PU 155K, SO 95K. MW = 9.0 ppg.
2/26/2007 00:00 - 00:30 0.50 CASE P RUNPRD RIH and orient HOOK Hanger w/MW D19 deg. left w/shoe at
12650/HOOK at 5270'. 127 gpm, 1146 psi.
00:30 - 02:00 1.50 CASE P RUNPRD RIH w/shoe to 12758'/HOOK to 5378' and see HOOK take wt.
SO 30K on HOOK. PU and HOOK came free w/157K UP.
POH to 5349'. PU 5' pup and use MWD to orient HOOK 160
deg. RIH into OH w/HOOK past landing point in window to
5383'. UP 157K, SO 83K. POH to 5349'. Orient HOOK to 28
deg. left. RIH and see HOOK take wt. at 5378'. land HOOK
Hanger and SO 35K. Drop 29/32" ball and circulate ball down
122 gpm, 1035 psi. Pressure up on HRD HOOK Hanger
running tool to 3250 and see ball seat shear out early. PU and
attempt to come free of HOOK w/running tool to 130K and liner
not released. SO 85K on HOOK. PU and see running tool
come free. UP wt 132K.
02:00 - 03:30 1.50 CASE P RUNPRD POH to 5300' and CBU. 140 gpm, 385 psi. MW = 9.0.
03:30 - 07:00 3.50 CASE P RUNPRD POH. Rack back HWDP. LD MWD and HOOK Hanger
running tool. Function BOPS. Clear rig floor.
07:00 - 08:00 1.00 TIEBAC P OTHCMP RU to run 4.5" LEM assembly w/2-3/8" innerstring.
08:00 - 09:30 1.50 TIEBAC P OTHCMP MU LEM assy. to 2-3/8" innerstring.
09:30 - 10:00 0.50 TIEBAC P OTHCMP RD LEM/Innerstring running equipment and clear floor.
10:00 - 11:30 1.50 TIEBAC P OTHCMP PU and RIH w/9 stds. of 4" HWDP and 12 stds. of 4.75" drill
collars to 2886'.
11:30 - 13:30 2.00 TIEBAC P OTHCMP RIH f/2886' U5448'. PU 132K, SO 118K.
13:30 - 14:00 0.50 TIEBAC P OTHCMP Wash down f/5448' past the L-1 liner top at 5488' and down
into the PBR barrel to 5498'. Latch LEM in to collet profile in
Printed: 3/5/2007 7:03:14 AM
i
BP EXPLORATION Page 32 of 34
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2/26/2007 13:30 - 14:00 0.50 TIEBAC P OTHCMP HOOK Hanger. SO 30K, PU to 135K to confirm latchup. PU
150K and see collet snap free. SO to 135K to allow collet to
re-engage the Hook hanger profile.
14:00 - 15:00 1.00 TIEBAC P OTHCMP Circulate Baker 1.75" ball to seat. 84 gpm, 350 psi. Ball
seated at 500 psi. Increase pressure t/2500 psi to set ZXP
liner top packer w/pusher tool. Bring pressure up to 4000 psi to
release HRD running tool. PU and tool free f/LEM. Line up
', pumps to kill line and pressure up to 1500 psi w/47 strokes and
test liner top packer for 5 minutes. OK. Bleed pressure to 0
psi. PU 8' to expose dogs on rotating dog sub above ZXP
extension sleeve. Rotate 10 rpms and slowly SO 45K to
ensure ZXP packer set.
15:00 - 17:30 2.50 TIEBAC P OTHCMP Displace SFMOBM OOH w/9.0 ppg brine as follows: Pump 25
bbl. LVT 126 gpm, 420 psi. Pump 25 bbl. Hi-Vis spacer 9.0
ppg, 84 gpm, 390 psi. Pump 50 bbl. 9.0 ppg brine w/Safe Surf
O surfactant, 231 gpm, 680 psi. Pump 25 bbl. HI Vis 9.0 ppg
spacer, 105 gpm, 260 psi. Circulate 365 bbls 9.0 ppg brine,
350 gpm, 2100 psi.
17:30 - 00:00 6.50 TIEBAC P OTHCMP Monitor well. Static. POH laying down drill pipe f/5543' and LD
30 jts of 4.75" drill collars.
2/27/2007 00:00 - 02:00 2.00 TIEBAC P OTHCMP POH to liner running tools. Make service breaks. Break out 4
2-3/8" EU jts from innerstring and LD all LEM running
equipment. Clear floor.
02:00 - 04:00 2.00 TIEBAC P OTHCMP PJSM. RIH w/drill pipe f/derrick to 4764'.
04:00 - 05:00 1.00 TIEBAC P OTHCMP Pump 20 bbl Safe-Surf-O sweep to surface 450 gpm, 1240 psi.
05:00 - 08:30 3.50 TIEBAC P OTHCMP Monitor well -static. MW in 9.0 ppg, MW out 9.0 ppg. B/D
Topdrive. POH laying down 135 joints of 4" drill pipe.
08:30 - 09:30 1.00 TIEBAC P OTHCMP PJSM. RIH w/drill pipe f/derrick to 4381'.
09:30 - 10:30 1.00 TIEBAC P OTHCMP Pump 20 bbl Safe-Surf-O sweep to surface. Clean MOBM out
of pipe racks. B/D topdrive. Monitor well -static, MW in 9.0
ppg, MW out 9.0 ppg.
10:30 - 11:30 1.00 TIEBAC P OTHCMP Cut and Slip 104' of drilling line. Inspect draworks.
11:30 - 14:30 3.00 TIEBAC P OTHCMP POH laying down 136 joints of 4" drill pipe, 9 joints HWDP, 6
joints 4 3/4" DC.
14:30 - 15:15 0.75 BUNCO RUNCMP -Clear rig floor of excess tools and equipment
-clean and ready floor to run 4 1/2" completion tubing
15:15 - 19:00 3.75 BUNCO RUNCMP -Pull wear ring
-Make Dummy run with Hanger -landed at 24.3'
-P/U Power tong and running equipment
-RU I-Wire spool & sheaves
19:00 - 21:00 2.00 BUNCO RUNCMP PJSM on running completion with NAD drilling crew and
Toolpusher, Service Hands, BP WSL. MU &RIH w/
completion string:
4.5" half muleshoe pup w/ 5.25" no-go fluted stop collar 6' up.
4.5" TCII HES "X" Nipple 3.813" ID
4.5" TCII HES "X" Nipple 3.813" ID w/ RHC plug
7.625" x 4.5" Baker Premier Packer
Phoenix CST Jet Pump Gauge
4.5" 13Cr HES CMD Sliding Sleeve
4.5" Phoenix Discharge Pressure Sensor.
Connected I-Wire and tested sensor equipment prior to RIH.
21:00 - 00:00 3.00 BUNCO RUNCMP Continue RIH w/ 4.5" VamTop completion string to 1,315' and
Printed: 3/5/2007 7:03:74 nM
BP EXPLORATION Page 33 of 34
Operations Summary Report
Legal Well Name: W-204
Common Well Name: W-204 Spud Date: 12/29/2006
Event Name: DRILL+COMPLETE Start: ~ 12/29/2006 End: 3/1/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/1/2007
Rig Name: NABOBS 7ES Rig Number:
Date From - To Hours ~ Task Code NPT Phase
-- --- - --1- --- - -
2/27/2007 21:00 - 00:00 3.00 I BUNCO P RUNCMP
2/28/2007 100:00 - 07:30 I 7.501 RUNCOI~IIP ~ I RUNCMP
07:30 - 09:00 I 1.501 RUNC01~1P I I RUNCMP
09:00 - 10:30 1.50 RUNCOAf1P RUNCMP
10:30 - 11:00 0.50 BUNCO LP RUNCMP
11:00 - 13:00 I 2.001 RUNCON'1P I I RUNCMP
13:00 - 15:00 ~ 2.00 ~ RUNCONIP ~ ~ RUNCMP
Description of Operations
testing I-Wire integrity every 1000'. Torque connections to
4440 ft-Ibs. Used Jet Lube Seal Guard
Continue running completion from 1,315' to 5,338' md.
Testing I-Wire every 1,000'.
Torque turned all connections to 4440 ft-Ibs optimum torque.
Utilized Jet Lube Seal Guard on threads.
Baker locked all connections below packer.
Ran total of 120 jts, 5010.5' 4.5" 12.6# 13Cr80 Vam Top tubing
69 - I-Wire Full Clamps
8 - I-Wire Half Clamps
Half mule shoe @ 5341.0' (4 ft below base of tieback
recepticle)
Tops:
4.5" TCII HES "X" Nipple 3.813" ID @ 5313'
4.5" TCII HES "X" Nipple 3.813" ID w/ RHC plug @ 5292'
7.625" x 4.5" Baker Premier Packer @ 5265'
Phoenix CST Jet Pump Gauge @ 5243'
4.5" 13Cr HES CMD Sliding Sleeve @ 5221'
4.5" Phoenix Discharge Pressure Sensor @ 5211'
GLM #1 - 4.5" 1" KBG-2, 9Cr, w/ DCK-2 Shear & BEK latch @
5102'.
GLM #2 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch @
4865'
GLM #3 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch @
3509'
GLM #4 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch @
2519'
4.5" TCII HES "X" Nipple 3.813" ID @ 2,205
-RIH tag NO GO @ 5,337' no-go depth
Space out tubing,
3 ea , 3.80' , 9.90', & 19.73', 4.5" 12.6# 13Cr80 Vam Top tubing
space out pups under top joint of tubing.
MU FMC Tubing Hanger (1 ft of Blast Rings installed below
hanger on pup jt with 4.5" TCII lifting threads).
Terminate I-Wire @ Hanger
Land Tubing @ 5,341' w178k PUW & 78k SOW
Run in Lock Down Screws and TO to 450 ft/Ibs, Gland Nuts to
350 fUlbs.
Back out landing joint for reverse circulation.
PJSM, Rig to reverse circ.
Pump 225 bbls total of 9.0 brine @ 3 bpm / 110 psi
Fluid sequence was:
80 bbls of clean 9.0 ppg brine followed with
85 bbls of corrision inhibtor treated 9.0 brine followed with
60 bbls of clean 9.0 brine
MU Landing joint. Drop ball/rod assembly. Back out and lay
down landing jt. Close blind rams and set the packer with 4,000
psi and hold for 30 min to test tubing. Bleed tubing pressure
slowly to 2500 psi and then pressure annulus to 3500 psi and
hold for 30 minute test. Bleed off pressure in annulus and then
tubing. Re-pressure annulus to shear DCK valve (sheared at
Printed: 3/5/2007 7:03:14 AM
BP EXPLORATION
Operations Surnmary Report
Legal Well Name: W-204
Common Well Name: W-204
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 7ES
Date (From - To ~ Hours ~ Task Code NPT
12/28/2007 ~ 13:00 - 15:00 I 2.00
15:00 - 16:00 I 1.00
16:00 - 18:00 I 2.001 BOPSUR P
18:00 - 21:00 3.00 BOPSUF{ P
21:00 - 00:00 3.00 WHSUR P
13/1/2007 00:00 - 01:00 1.00 WHSUR
01:00 - 02:00 1.00 WHSUR
02:00 - 04:00 2.00 WHSUR
04:00 - 04:45 0.75 WHSUR
04:45 - 06:00 1.25 WHSUR
06:00 - 09:00 I 3.001 WHSUR
Start: 12/29/2006
Rig Release: 3/1 /2007
Rig Number:
Page 34 of 34 ~
Spud Date: 12/29/2006
End: 3/1 /2007
Phase Description of Operations
RUNCMP 2500 psi), Pump both ways to verify shear, 2 bbls down
annulus @ 21 spm / 200 psi, pump 2 bbls ~ 21 spm / 200 psi
down the tubing.
RUNCMP FMC dry rod TWC, test from below to 1,000 psi f/5 min. B/D
lines.
RUNCMP Thouroghly clean Derrick, rig Floor, rig floor drain system and
drip pan, cellar area and mud pits of all oil based mud prior to
nipple down.
-Rig down all tubing running equipment
-Flush and blow out all mud lines
RUNCMP PJSM. R/D drilling nipple, Remove blind/shear rams, N/D BOP
RUNCMP Nipple up adapter flange, terminate I-wire and test. Test
adapter flange to 5,000 psi, nipple up and tree.
RUNCMP Continue NU & Test tree to 5,000 psi. -Good.
RUNCMP R/U DSM Lubricator pull TWC, R/D lubricator.
RUNCMP R/U Little Red, test lines to, 3,000 psi. Freeze protect tubing v
and annulus to 2,200' with 91 bbls diesel heated to 70 deg.
RUNCMP Allow diesel to U-tube.
RUNCMP R/U DSM Lubricator and install BPV, test from below to 1,000
psi. Install VR plugs in tubing annulus valve outlets. Clean
cellar, remove secondary annulus valves.
RUNCMP Secure cellar. Offload brine, clean pits, clean out cuttings tank.
Secure topdrive to rig floorbrdle up blocks. UD cattle chute.
Release Rig @ 0900 hrs 3/1/2007
Punted: 3/5/2007 7:U3aa AM
by
~~~~ ~ ~~~ Schluma~raer
~~~~~~: vv-~u4~~ purvey Kepvri -
Report Date: 21-Feb-07 Survey /DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 1.550°
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure /Slot: W-PAD / W204 ND Reference Datum: Rotary Table
Well: W204 ND Reference Elevation: 81.52 tt relative to MSL
Borehole: W-204L2 Sea Bed /Ground Level Elevation: 52.60 ft relative io MSL
UWUAPI#: 50292333361 Magnetic Declination: 23.851 °
Survey Name /Date: W-204L2 /February 21, 2007 Total Field Strength: 57638.751 nT
Ton /AHD / DDI / ERD ratio: 320.613° / 8657.33 ft / 6.850 / 1.723 Magnetic Dip: 80.889°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 15, 2007
location LaUlong: N 70.29921663, W 149.09253499 Magnetic Declination Model: BGGM 2006
location Grid NIE Y/X: N 5959836.120 ftUS, E 612049.120 ftUS North Reference: True North
Grid Convergence Angle: +0.85435553° Total Corr Mag North -> True North: +23.851 °
Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head
•
Comments Measured Inclination Azimuth SutrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de n n n n ft ft ft de 100 tt nUS
ncnO~C 7n ttUS
C1nnAn 1n
nl ~n 7nn7i CCQ
1n/ 1A~ n~/]C/]A OD
FtII_ U.UV U.VV V.UU -iS ~.~L V.VV V.VV V.VV V.VV V.VV V.VV V.VV J~JJVJV.IL IIILV'7J.IG Ir /V.LJJLIVVV ~• ~~V.VVC.VV~VV
GYD CT DMS 100.00 0.34 149.95 18.48 100.00 -0.25 0.30 0.30 -0.26 0.15 0.34 5959835.87 612049.27 N 70.29921592 W 149.09253378
169.00 0.40 143.89 87.48 169.00 -0.62 0.74 0.74 -0.63 0.39 0.10 5959835.50 612049.52 N 70.29921491 W 149.09253181
200.00 0.69 151.96 118.48 200.00 -0.87 1.04 1.04 -0.88 0.54 0.97 5959835.25 612049.68 N 70.29921422 W 149.09253058
258.00 0.85 159.49 176.47 257.99 -1.57 1.81 1.81 -1.59 0.86 0.33 5959834.54 612050.00 N 70.29921228 W 149.09252803
300.00 0.77 147.72 218.47 299.99 -2.09 2.41 2.40 -2.12 1.12 0.44 5959834.01 612050.27 N 70.29921083 W 149.09252592
400.00 0.98 146.00 318.46 399.98 -3.35 3.93 3.92 -3.40 1.96 0.21 5959832.75 612051.13 N 70.29920734 W 149.09251915
500.00 0.83 147.45 418.44 499.96 -4.64 5.51 .5.50 -4.72 2.82 0.15 5959831.44 612052.01 N 70.29920373 W 149.09251212
600.00 0.99 142.21 518.43 599.95 -5.91 7.10 7.08 -6.01 3.74 0.18 5959830.16 612052.95 N 70.29920020 W 149.09250468
700.00 0.83 150.26 618.42 699.94 -7.20 8.69 8.67 -7.32 4.63 0.20 5959828.87 612053.86 N 70.29919662 W 149.09249748
Last GYD CT DMS 797.00 0.24 143.69 715.41 796.93 -7.96 9.59 9.57 -8.10 5.10 0.61 5959828.10 612054.34 N 70.29919450 W 149.0924
MWD+IFR+MS 922.98 0.37 318.09 841.39 922.91 -7.87 9.94 9.43 -8.01 4.99 0.48 5959828.19 612054.22 N 70.29919475 W 149.0924
1018.61 0.79 323.25 937.02 1018.54 -7.13 10.91 8.47 -7.25 4.38 0.44 5959828.94 612053.61 N 70.29919682 W 149.09249 8
1114.01 0.73 329.39 1032.41 1113.93 -6.10 12.18 7.21 -6.20 3.68 0.11 5959829.98 612052.89 N 70.29919969 W 149.09250517
1210.23 0.90 353.85 1128.62 1210.14 -4.83 13.52 5.92 -4.92 3.29 0.40 5959831.25 612052.48 N 70.29920318 W 149.09250836
1303.82 1.01 342.17 1222.20 1303.72 -3.32 15.08 4.51 -3.40 2.96 0.24 5959832.76 612052.13 N 70.29920732 W 149.09251104
1399.07 1.25 356.69 1317.43 1398.95 -1.50 16.95 3.07 -1.57 2.64 0.39 5959834.59 612051.78 N 70.29921234 W 149.09251361
1495.44 1.09 355.76 1413.78 1495.30 0.46 18.91 2.54 0.40 2.51 0.17 5959836.55 612051.63 N 70.29921771 W 149.09251465
1592.28 1.20 356.89 1510.60 1592.12 2.39 20.85 3.33 2.33 2.39 0.12 5959838.48 612051.47 N 70.29922298 W 149.09251564
1687.44 0.79 330.62 1605.74 1687.26 3.95 22.47 4.38 3.89 2.01 0.63 5959840.04 612051.07 N 70.29922726 W 149.09251869
1781.85 0.83 352.86 1700.15 1781.67 5.18 23.79 5.38 5.14 1.61 0.33 5959841.28 612050.65 N 70.29923066 W 149.09252196
1877.80 1.13 2.11 1796.08 1877.60 6.81 25.43 6.95 6.77 1.56 0.35 5959842.92 612050.58 N 70.29923513 W 149.09252238
1973.78 0.96 2.84 1892.05 1973.57 8.56 27.18 8.68 8.52 1.63 0.18 5959844.67 612050.62 N 70.29923991 W 149.09252178
2070.10 1.04 344.92 1988.35 2069.87 10.21 28.85 10.27 10.17 1.44 0.33 5959846.31 612050.41 N 70.29924442 W 149.09252329
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/2007 10:56 AM Page 1 of 8
Comments Measured Inclination Azimuth SutrSea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de n n n n n ft n de 100 ft nUS ftUS
Tie-In Survey
Top Window (Blind)
Base Window (Blind)
Inc+Trend
Last Inc+Trend
21(ib.3U U.tt4 ;i4b.tStS LUtSJ.b4 Llt)b.Ub
2261.77 0.83 345.85 2180.00 2261.52
2357.09 2.40 32.53 2275.28 2356.80
2452.78 4.50 42.73 2370.79 2452.31
2547.41 6.89 52.37 2464.95 2546.47
2643.42 9.03 49.85 2560.03 2641.55
2737.28 11.06 47.21 2652.45 2733.97
2833.00 11.65 39.14 2746.30 2827.82
2928.85 11.95 38.20 2840.12 2921.64
3024.05 12.13 38.62 2933.23 3014.75
3119.93 12.90 38.76 3026.83 3108.35
3215.85
3288.00
3348.85
3443.74
3538.42
3635.18
3730.28
3827.95
3922.15
4019.84
4116.03
4211.01
4306.19
4401.96
4497.91
4592.34
4688.49
4784.39
4880.69
4973.34
5074.06
5163.32
5258.85
5356.06
5366.00
5378.00
5396.79
5435.57
5467.94
5500.77
14.63 39.24 3119.99 3201.51
15.06 39.22 3189.73 3271.25
14.91 40.15 3248.51 3330.03
14.78 40.00 3340.24 3421.76
14.72 39.49 3431.80 3513.32
11./1
13.06
15.44
19.98
26.36
35.01
46.21
60.28
75.91
91.80
108.36
126.48
141.11
153.48
172.50
191.45
3V.41
31.81
34.38
40.13
49.50
62.79
79.16
97.97
117.57
137.43
158.21
181.03
199.52
215.25
239.56
263.67
14.59 40.18 3525.41 3606.93 210.66 288.15
14. 66 40.00 3617.43 3698.95 229.44 312.16
14. 84 39.73 3711.88 3793.40 248.95 337.03
15. 04 40.21 3802.89 3884.41 267.98 361.31
18. 04 36.19 3896.53 3978.05 290.33 389.11
20.06
24.15
26.17
28.84
32.29
35.80
39.68
43.38
46.09
50.11
54.17
56.40
60.10
63.96
64.36
66.28
68.13
72.98
76.82
80.63
31 .99 3987.46 4068.98 316.81 420.49
26 .12 4075.45 4156.97 348.54 456.20
20 .20 4161.61 4243.13 386.15 496.63
12 .94 4246.57 4328.09 428.82 540.81
10 .05 4329.18 4410.70 476.87 589.59
11./J
13.07
15.48
20.53
28.78
41.16
57.12
75.85
95.45
115.31
136.08
158.91
177.39
193.12
217.43
241.53
266.01
290.02
314.89
339.17
366.95
398.21
433.40
472.56
514.18
559.21
I I.OiS I.VO V.L I D~0~84/.8L
13.05 0.71 0.01 5959849.17
15.40 1.61 2.02 5959851.54
19.85 5.24 2.28 5959856.04
26.04 12.25 2.71 5959862.34
34.42 22.57 2.26 5959870.86
45.28 34.81 2.22 5959881.91
59.02 47.65 1.77 5959895.83
74.32 59.89 0.37 5959911.32
89.88 72.23 0.21 5959927.06
106.10 85.22 0.80 5959943.47
123.83
138.15
150.26
168.86
187.39
99.59
111.28
121.32
136.98
152.39
1.81 5959961.41
0.60 5959975.90
0.47 5959988.15
0.14 5960006.99
0.15 5960025.75
206.19
224.56
243.65
262.26
284.15
310.17
341.45
378.64
420.99
468.79
6.99 4407.42 4488.94 529.33 642.44 607.66 521.06
4.99 4483.44 4564.96 587.99 701.27 661.44 579.58
3.68 4555.22 4636.74 651.48 764.84 719.77 642.97
3.09 4623.62 4705.14 719.22 832.61 782.46 710.62
2.26 4685.48 4767.00 788.15 901.56 846.75 779.49
1.15 4747.29 4828.81 867.65 981.06 921.27 858.96
357.44 4798.13 4879.65 940.94 1054.42 989.69 932.30
354.88 4848.40 4929.92 1021.79 1135.64 1064.67 1013.32
354.61 4893.98 4975.50 1107.02 1221.48 1144.11 1098.80
354.74 4898.31 4979.83 1115.90 1230.42 1152.44 1107.71
354.74 4903.32 4984.84 1126.73 1241.33 1162.60 1118.57
355.66 4910.60 4992.12 1143.95 1258.65 1178.83 1135.83
357.67 4923.51 5005.03 1180.37 1295.20 1213.48 1172.32
359.32 4931.94 5013.46 1211.57 1326.45 1243.48 1203.56
1.02 4938.36 5019.88 1243.75 1358.64 1274.69 1235.75
168.07
183.53
199.47
215.07
232.19
249.73
266.92
282.74
295.21
304.87
312.64
318.73
323.51
327.51
330.71
333.05
332.12
326.64
318.78
317.95
316.95
315.50
313.38
312.56
312.66
0.22 5960044.78
0.09 5960063.37
0.20 5960082.69
0.25 5960101.53
3.29 5960123.68
2.54 5960149.95
4.89 5960181.48
3.39 5960218.90
4.47 5960261.43
3.91 5960309.37
4.14 5960361.74
4.23 5960420.34
3.96 5960483.78
2.85 5960551.48
4.39 5960620.39
4.12 5960699.88
4.23 5960773.19
4.49 5960854.11
3.98 5960939.46
4.19 5960948.35
16.00 5960959.19
10.83 5960976.43
13.43 5961012.88
12.84 5961044.10
12.67 5961076.28
O ILV4~..`1y IV /V.L.7.7L40.74 VV 14.7.V.7LVL04.7
612049.63 N 70.29925227 W 149.09252927
612050.50 N 70.29925869 W 149.09252195
612054.06 N 70.29927084 W 149.09249259
612060.98 N 70.29928776 W 149.09243578
612071.17 N 70.29931064 W 149.09235221
612083.25 N 70.29934033 W 149.09225310
612095.88 N 70.29937785 W 149.09214914
612107.89 N 70.29941966 W 149.09204997
612120.00 N 70.29946217 W 149.09195006
612132.74 N 70.29950647 W 149.09184489
612146.84 N 70.29955491 W 149.0917
612158.32 N 70.29959403 W 149.09163387
612168.18 N 70.29962711 W 149.09155252
612183.55 N 70.29967793 W 149.09142577
612198.68 N 70.29972856 W 149.09130096
612214.08 N 70.29977992 W 149.09117397
612229.27 N 70.29983010 W 149.09104875
612244.92 N 70.29988225 W 149.09091967
612260.24 N 70.29993309 W 149.09079333
612277.03 N 70.29999290 W 149.09065469
612294.17
612310.90
612326.16
612338.00
612346.94
612353.93
612359.15
612362.98
612365.96
612368.14
612369.30
612367.27
612360.59
612351.45
612350.49
612349.33
612347.62
612344.96
612343.68
612343.30
N 70.30006397 W 149.09051268
N 70.30014942 W 149.09037344
N 70.30025102 W 149.09024529
N 70.30036672 W 149.09014429
N 70.30049732 W 149.09006606
N 70.30064011 W 149.09000315
N 70.30079998 W 149.08995377
N 70.30097315 W 149.0899
N 70.30115797 W 149.0898
N 70.30134612 W 149.08985673
N 70.30156322 W 149.08983772
N 70.30176358 W 149.08984526
N 70.30198493 W 149.08988957
N 70.30221845 W 149.08995324
N 70.30224278 W 149.08995997
N 70.30227245 W 149.08996806
N 70.30231960 W 149.08997978
N 70.30241930 W 149.08999691
N 70.30250463 W 149.09000352
N 70.30259257 W 149.09000271
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/2007 10:56 AM Page 2 of 8
Comments Measured Inclination Azimuth SutrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
tt de de tt tt it tt ft ft tt de loon ftUS ftUS
MWU+IF-Fi+MS bb:il.i57
5563.04
5594.77
5627.94
5660.10
5692.73
5723.93
5755.74
5788.13
5818.88
5850.23
5882.76
5914.44
5946.61
5977.89
6010.28
6041.66
6073.90
6106.16
6136.63
6168.40
6200.52
6232.63
6264.40
6296.05
6328.39
6359.76
6391.92
6423.26
6455.13
6486.99
6519.21
6551.24
6582.10
6614.87
6647.08
6678.31
6710.36
6741.91
6773.46
6805.16
6837.17
i55.ZV L.4/ 4y4Z.1~ OVLJ./ 1
89.25 3.49 4943.70 5025.22
92.89 4.16 4943.11 5024.63
94.68 4.97 4940.92 5022.44
95.81 2.22 4937.98 5019.50
95.09 359.95 4934.88 5016.40
93.75 358.29 4932.47 5013.99
94.09 358.35 4930.30 5011.82
94.26 357.72 4927.94 5009.46
94.40 357.59 4925.62 5007.14
93.75 354.69 4923.39 5004.91
93.23 352.89 4921.41 5002.93
92.58 353.04 4919.80 5001.32
90.80 350.37 4918.86 5000.38
89.87 348.87 4918.67 5000.19
89.84
91.00
91.76
91.76
91.72
92.34
91.48
91.17
92.24
92.82
348.24 4918.75 5000.27
348.99 4918.52 5000.04
349.89 4917.75 4999.27
350.34 4916.76 4998.28
348.70 4915.83 4997.35
I L / 4..74
1305.72
1337.41
1370.47
1402.47
1434.95
1466.02
1497.71
1529.95
1560.54
1591.67
1623.84
1655.13
1686.80
1717.41
1748.97
1779.55
1811.06
1842.67
1872.45
ILOO.VG JIJ.VV
1297.67 315.22
1329.32 317.34
1362.31 319.97
1394.27 321.98
1426.74 322.60
1457.84 322.12
1489.57 321.19
1521.85 320.08
1552.49 318.83
1583.68 316.72
1615.96 313.21
1647.36 309.33
1679.18 304.70
1709.94 299.06
1741.69
1772.45
1804.13
1835.90
1865.85
292.63
286.44
280.53
275.00
269.46
1897.01
1928.57
1960.18
1991.54
2022.87
349.29 4914.71 4996.23 1903.44
349.60 4913.64 4995.16 1934.83
350.26 4912.89 4994.41 1966.27
351.79 4911.95 4993.47 1997.49
352.69 4910.55 4992.07 2028.70
91.93
91.38
91.48
91.21
91.11
91.35
91.35
91.14
91.24
91.41
90.93
90.90
90.90
91.24
91.45
91.65
91.72
353.73
354.39
353.44
353.43
353.51
352.91
353.82
354.11
353.30
354.82
354.82
354.87
354.47
354.19
354.19
353.58
354.18
4909.21
4908.31
4907.50
4906.77
4906.12
4905.44
4904.68
4903.98
4903.34
4902.58
4901.93
4901.43
4900.92
4900.34
4899.59
4898.74
4897.80
I J0~.44
1420.62
1452.34
1485.44
1517.46
1549.94
1581.05
1612.79
1645.09
1675.75
1707.02
1739.49
1771.13
1803.29
1834.57
1866.96
1898.33
1930.56
1962.81
1993.27
2025.02
2057.12
2089.22
2120.97
2152.59
1 JV4. / /
1335.41
1366.67
1399.38
1430.96
1462.76
1493.01
1523.80
1555.15
1584.89
1615.04
1646.03
1676.15
1706.60
1735.90
1766.10
1795.45
1825.81
1856.38
1885.20
1915.21
1945.69
1976.30
2006.80
2037.38
4990.73 2060.67 2184.90 2068. 79
4989.83 2091.76 2216.26 2099. 41
4989.02 2123.62 2248.41 2130. 80
4988.29 2154.64 2279.74 2161. 37
4987.64 2186.19 2311.61 2192. 47
4986.96
4986.20
4985.50
4984.86
4984.10
4983.45
4982.95
4982.44
4981.86
4981.11
4980.26
4979.32
2054.96
2086.15
2118.11
2149.24
2180.90
2217.70 2343.46 2223.56 2212.53
2249.58 2375.67 2255.04 2244.52
2281.33 2407.69 2286.42 2276.37
2311.89 2438.55 2316.64 2307.03
2344.37 2471.31 2348.79 2339.62
263.40
257.52
251.90
246.95
242.68
238.86
235.61
232.21
228.62
225.00
221.23
217.51
214.15
210.76
207.37
2376.35 2503.51 2380.49 2371.69 204.47
2407.36 2534.74 2411.24 2402.79 201.66
2439.18 2566.78 2442.79 2434.70 198.68
2470.47 2598.33 2473.83 2466.09 195.57
2501.76 2629.87 2504.86 2497.47 192.37
2533.16 2661.56 2536.03 2528.97 189.00
2564.87 2693.55 2567.50 2560.79 185.59
I J.YY JJVI IVI.V/ VIGJYJ./V /V.JVGV/vvv
13.37 5961138.23 612344.93 N 70.30276174 W 149.08998194
11.66 5961169.90 612346.58 N 70.30284820 W 149.08996479
5.92 5961202.93 612348.72 N 70.30293833 W 149.08994345
9.21 5961234.91 612350.25 N 70.30302564 W 149.08992717
7.27 5961267.39 612350.38 N 70.30311435 W 149.08992218
6.83 5961298.48 612349.44 N 70.30319932 W 149.08992604
1.09 5961330.18 612348.04 N 70.30328598 W 149.08993357
2.01 5961362.44 612346.45 N 70.30337418 W 149.08994253
0.62 5961393.05 612344.74 N 70.30345788 W 149.08995268
9.46 5961424.21 612342.17 N 70.30354311 W 149.08996972
5.75 5961456.43 612338.17 N 70.30363129 W 149.0899
2.11 5961487.77 612333.83 N 70.30371707 W 149.0900
9.97 5961519.51 612328.72 N 70.30380399 W 149.09006709
5.64 5961550.18 612322.63 N 70.30388804 W 149.09011273
1.95 5961581.83 612315.73 N 70.30397477 W 149.09016477
4.40 5961612.49 612309.08 N 70.30405881 W 149.09021493
3.65 5961644.08 612302.70 N 70.30414536 W 149.09026277
1.39 5961675.75 612296.69 N 70.30423215 W 149.09030759
5.38 5961705.61 612290.70 N 70.30431396 W 149.09035245
2.69 5961736.68 612284.18 N 70.30439910 W 149.09040154
2.85 5961768.15 612277.83 N 70.30448532 W 149.09044916
2.27 5961799.66 612271.75 N 70.30457167 W 149.09049461
5.87 5961830.95 612266.33 N 70.30465736 W 149.09053473
3.38 5961862.21 612261.59 N 70.30474295 W 149.09056930
4.23 5961894.23 612257.29 N 70.30483060 W 149.09060024
2.74 5961925.36 612253.58 N 70.30491580 W 149.09062651
2.97 5961957.28 612249.70 N 70.30500314 W 149.09065411
0.86 5961988.34 612245.66 N 70.30508817 W 149.09068311
0.40 5962019.94 612241.56 N 70.30517466 W 149.0907
2.03 5962051.50 612237.32 N 70.30526107 W 149.09074296
2.82 5962083.44 612233.13 N 70.30534847 W 149.09077309
1.12 5962115.23 612229.28 N 70.30543547 W 149.09080036
2.64 5962145.84 612225.44 N 70.30551925 W 149.09082775
4.67 5962178.36 612221.57 N 70.30560827 W 149.09085521
1.49 5962210.39 612218.18 N 70.30569589 W 149.09087875
0.19 5962241.44 612214.92 N 70.30578085 W 149.09090147
1.25 5962273.29 612211.46 N 70.30586802 W 149.09092558
1.40 5962304.63 612207.88 N 70.30595377 W 149.09095082
0.67 5962335.96 612204.22 N 70.30603950 W 149.09097667
2.02 5962367.41 612200.38 N 70.30612558 W 149.09100401
1.89 5962399.16 612196.49 N 70.30621249 W 149.09103164
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/200710:56 AM Page 3 of 8
Comments Measured Inclination Azimuth SutrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
n de de n n n n n ft n de 100 tt nUS nUS
baba.vb ai.,sw soa.ao
6900.47 90.66 355.08
6932.58 90.87 355.38
6963.59 91.17 355.36
6995.61 91.96 355.91
7028.03 92.31 356.07
7059.90 92.27 355.94
7091.82 92.51 356.00
7122.97 92.96 355.70
7154.94 92.14 355.47
7187.71 91.59 355.62
7220.40 91.38 355.54
7252.44 91.76. 355.30
7283.69 92.48 355.59
7315.42 92.00 354.74
7347.62 91.07 353.88
7379.10 91.48 354.32
7412.14 91.69 354.31
7443.32
7474.25
7507.06
7538.72
7570.28
7602.47
7635.13
7666.93
7699.40
7731.78
7763.19
7796.25
7827.33
7856.57
7886.48
91.89
91.76
89.25
86.65
86.16
353.31
352.66
351.81
351.88
351.45
7916.15
7946.49
7976.57
soos.7o
8036.72
8066.96
8095.88
8126.10
8155.90
waao.aw
4896.40
4895.97
4895.42
4894.54
4893.33
4892.06
4890.73
4889.24
4887.82
4886.75
4885.91
4885.03
4883.87
4882.63
4881.77
4881.07
4880.16
4879.18
4878.20
4877.91
4879.04
4881.02
4.`7/0.40 G.7.70.40 G/L.7.4G GJ.~O.VV
4977.92 2627.64 2756.84 2629.86
4977.49 2659.55 2788.94 2661.61
4976.94 2690.37 2819.95 2692.28
4976.06 2722.21 2851.96 2723.97
4974.85 2754.46 2884.35 2756.09
4973.58 2786.15 2916.20 2787.66
4972.25 2817.89 2948.09 2819.29
4970.76 2848.85 2979.20 2850.14
4969.34 2880.62 3011.14 2881.79
4968.27 2913.19 3043.90 2914.26
4967.43 2945.69 3076.57 2946.66
4966.55 2977.54 3108.60 2978.41
4965.39
4964.15
4963.29
4962.59
4961.68
4960.70
4959.72
4959.43
4960.56
4962.54
86.61 350.15 4883.05
86. 44 351.43 4885.03
86. 20 349.88 4887.07
86. 61 349.95 4889.11
86. 58 350.60 4891.03
86.82
86.88
86.75
87.06
87.40
87.50
87.37
88.09
88.94
91.51
91.14
90.97
90.76
90.66
351.17
350.66
351.56
353.91
353.10
355.57
357.50
358.78
358.55
359.65
358.95
358.02
357.86
357.46
4964.57
4966.55
4968.59
4970.63
4972.55
4892.84 4974.36
4894.65 4976.17
4896.38 4977.90
4897.96 4979.48
4899.40 4980.92
3008.59
3040.10
3072.03
3103.23
3136.00
3166.88
3197.45
3229.82
3261.01
3292.04
3323.60
3355.62
3386.79
3418.53
3450.22
3481.04
3513.48
3544.00
3572.85
3602.43
3139.83
3171.54
3203.72
3235.20
3268.22
3299.39
3330.30
3363.11
3394.75
3426.24
3458.37
3490.97
3522.70
3555.11
3587.43
3618.79
3651.80
3682.83
3712.03
3741.91
4900.72 4982.24 3631.84 3771.55
4902.08 4983.60 3662.03 3801.86
4903.27 4984.79 3692.03 3831.91
4904.05 4985.57 3722.11 3862.03
4903.94 4985.46 3752.10 3892.05
4903.24 4984.76 3782.31 3922.28
4902.71 4984.23 3811.18 3951.20
4902.25 4983.77 3841.34 3981.41
4901.88 4983.40 3871.07 4011.21
3009.37
3040.80
3072.64
3103.76
3136.45
3167.25
3197.75
3230.06
3261.18
3292.16
3323.67
3355.66
3386.80
3418.53
3450.23
3481.05
3513.51
3544.06
3572.94
3602.55
3631.98
3662.20
3692.22
3722.31
3752.31
3782.53
3811.42
3841.60
3871.35
LJ~G.YV ~ VG.GV G~VV.vv v ~ ~ ~ Vc.v~ ~ ~ • v.vvvcvvvv • • ~ ~v.vv ~ vvvvv
2623.75 179.22 4.53 5962462.02 612189.19 N 70.30638450 W 149.09108317
2655.74 176.55 1.14 5962493.97 612186.04 N 70.30647191 W 149.09110479
2686.65 174.05 0.97 5962524.83 612183.08 N 70.30655633 W 149.09112506
2718.56 171.61 3.01 5962556.70 612180.17 N 70.30664352 W 149.09114479
2750.88 169.35 1.19 5962588.98 612177.42 N 70.30673181 W 149.09116314
2782.65 167.13 0.43 5962620.71 612174.73 N 70.30681860 W 149.09118110
2814.46 164.89 0.77 5962652.48 612172.01 N 70.30690551 W 149.09119925
2845.49 162:64 1.74 5962683.47 612169.30 N 70.30699029 W 149.09121749
2877.34 160.18 2.66 5962715.27 612166.37 N 70.30707728 W 149.09123740
2909.99 157.63 1.74 5962747.88 612163.34 N 70.30716649 W 149.09125800
2942.57 155.12 0.69 5962780.42 612160.33 N 70.30725550 W 149.0912
2974.50 152.56 1.40 5962812.30 612157.30 N 70.30734272 W 149.0912
3005.63 150.08 2.48 5962843.39 612154.36 N 70.30742777 W 149.09131920
3037.22 147.41 3.07 5962874.94 612151.21 N 70.30751407 W 149.09134084
3069.25 144.21 3.93 5962906.91 612147.55 N 70.30760158 W 149.09136669
3100.56 140.98 1.91 5962938.16 612143.84 N 70.30768710 W 149.09139289
3133.42 137.71 0.64 5962970.97 612140.08 N 70.30777688 W 149.09141939
3164.40 134.35 3.27 5963001.90 612136.26 N 70.30786153 W 149.09144661
3195.09 130.57 2.14 5963032.52 612132.03 N 70.30794535 W 149.09147719
3227.59 126.14 8.08 5963064.95 612127.11 N 70.30803415 W 149.09151309
3258.91 121.65 8.22 5963096.19 612122.16 N 70.30811971 W 149.09154944
3290.07 117.09 2.06 5963127.28 612117.13 N 70.30820485 W 149.09158643
3321.79 111.95 4.27 5963158.91 612111.52 N 70.30829148 W 149.09162804
3353.96 106.73 3.95 5963191.01 612105.83 N 70.30837939 W 149.09167030
3385.28 101.58 4.92 5963222.24 612100.21 N 70.30846494 W 149.09171204
3417.18 95.90 1.28 5963254.05 612094.06 N 70.30855210 W 149.09175801
3449.04 90.44 2.01 5963285.82 612088.12 N 70.30863913 W 149.09180224
3480.00 85.48 1.97 5963316.70 612082.70 N 70.30872372 W 149.0918
3512.60 80.27 1.55 5963349.22 612077.00 N 70.30881277 W 149.0918
3543.26 75.47 2.92 5963379.80 612071.75 N 70.30889652 W 149.09192356
3572.22 71.78 8.09 5963408.70 612067.62 N 70.30897564 W 149.09195346
3601.90 68.40 2.93 5963438.32 612063.80 N 70.30905674 W 149.09198084
3631.39 65.47 8.32 5963467.77 612060.44 N 70.30913731 W 149.09200454
3661.65 63.64 6.37 5963497.99 612058.15 N 70.30921996 W 149.09201938
3691.69 62.67 4.88 5963528.01 612056.73 N 70.30930202 W 149.09202728
3721.80 61.96 2.92 5963558.10 612055.58 N 70.30938429 W 149.09203296
3751.81 61.49 9.31 5963588.10 612054.66 N 70.30946628 W 149.09203678
3782.04 61.12 2.62 5963618.32 612053.84 N 70.30954886 W 149.09203977
3810.95 60.36 3.27 5963647.21 612052.65 N 70.30962783 W 149.09204596
3841.14 59.27 0.87 5963677.38 612051.11 N 70.30971032 W 149.09205476
3870.91 58.06 1.38 5963707.13 612049.45 N 70.30979166 W 149.09206461
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/2007 10:56 AM Page 4 of 8
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft n n n n ft ft de oo ft ftUS ftUS
251 CO. / W
8215.48
8245.57
8274.56
8305.28
8335.53
8365.27
8395.73
8426.87
8455.20
sa8s.8o
8516.23
8545.22
8576.30
8605.68
8634.51
8667.20
8699.19
8730.03
8762.04
8793.82
8821.78
8855.84
8887.17
8918.45
8950.33
8982.95
9014.01
9046.71
9078.86
9110.38
9141.80
9173.59
9207.25
9238.49
9270.33
Yv.oa 300.30 47V 1.00
89.51 357.85 4901.53
90.59 357.97 4901.50
88.60 358.25 4901.71
90.93 359.70 4901.83
91.65 0.23 4901.15
92.72
93.85
93.23
93.51
93.34
92.58
92.72
92.61
92.38
92.44
92.34
92.41
92.41
92.48
92.48
92.61
92.82
92.99
92.27
92.72
92.58
92.20
92.79
93.16
93.10
91.72
91.45
91.14
91.28
91.45
4.703. V /
4983.05
4983.02
4983.23
4983.35
4982.67
359.47 4900.02 4981.54
0.78 4898.27 4979.79
0.23 4896.35 4977.87
0.51 4894.68 4976.20
1.32 4892.80 4974.32
359.70 4891.28 4972.80
0.95 4889.94 4971.46
0.84 4888.49 4970.01
359.92 4887.21 4968.73
0.46 4886.00 4967.52
359.78
359.70
358.92
358.26
357.82
358.12
358.27
357.22
357.42
357.07
4884.64 4966.16
4883.31 4964.83
4882.01 4963.53
4880.65 4962.17
4879.27 4960.79
4878.03
4876.42
4874.83
4873.40
4872.01
356.79
356.50
356.70
357.52
357.42
357.90
357.99
357.41
357.57
357.30
9302.20 91.00 357.73
9333.65 90.59 357.42
9365.66 90.80 357.21
9397.42 90.83 358.34
9429.21 89.66 357.71
4870.50
4869.20
4867.78
4866.11
4864.39
4863.07
4862.19
4861.43
4860.77
4860.01
4859.33
4858.89
4858.51
4858.05
4857.92
4959.55
4957.94
4956.35
4954.92
4953.53
J.7V V.O V
3930.53
3960.56
3989.50
4020.18
4050.41
4080.12
4110.52
4141.59
4169.87
4201.41
4230.79
4259.75
4290.79
4320.14
4348.93
4381.58
4413.53
4444.32
4476.26
4507.95
4535.83
4569.79
4601.01
4632.17
4663.93
YV41.VJ
4070.79
4100.88
4129.86
4160.58
4190.82
4220.54
4250.95
4282.03
4310.31
4341.86
4371.25
4400.21
4431.25
4460.61
4489.41
4522.07
4554.03
4584.85
4616.83
4648.58
4676.51
4710.53
4741.82
4773.07
4804.92
JAV I.IJ J~VV./J JV.~/
3930.86
3960.91
3989.86
4020.56
4050.80
3930.46 55.99
3960.53 54.90
3989.50 53.94
4020.21 53.39
4050.45 53.37
4080.52
4110.92
4142.00
4170.29
4201.83
4231.22
4260.18
4291.22
4320.57
4349.38
4382.04
4413.99
4444.80
4476.76
4508.47
4536.37
4570.36
4601.61
4632.81
4664.60
4952.02 4696.41 4837.50 4697.12
4950.72 4727.33 4868.54 4728.08
4949.30 4759.88 4901.20 4760.68
4947.63 4791.89 4933.31 4792.73
4945.91 4823.28 4964.78 4824.16
4944.59
4943.71
4942.95
4942.29
4941.53
4940.85
4940.41
4940.03
4939.57
4939.44
4854.60
4886.31
4919.89
4951.04
4982.79
5014.58
5045.95
5077.87
5109.55
5141.28
4996.18 4855.51
5027.95 4887.26
5061.60 4920.87
5092.84 4952.07
5124.67 4983.86
4080.17 53.30
4110.58 53.36
4141.66 53.64
4169.94 53.82
4201.48 54.32
4230.87
4259.82
4290.87
4320.22
4349.02
54.58
54.75
55.23
55.43
55.52
4381.68
4413.64
4444.46
4476.43
4508.16
4536.07
4570.08
4601.34
4632.56
4664.37
4696.91
4727.89
4760.50
4792.56
4824.01
4855.37
4887.13
4920.75
4951.95
4983.75
55.59
55.45
55.07
54.29
53.20
52.21
51.14
49.91
48.45
46.92
45.17
43.36
41.42
39.80
38.41
37.13
35.99
34.64
33.27
31.85
5156.53 5015. 68 5015.59 30.47
5187.98 5047. 09 5047.01 29.13
5219.99 5079. 05 5078.98 27.64
5251.74 5110. 78 5110.71 26.40
5283.53 5142. 54 5142.48 25.31
4.05 5963766.63 612046.50 N 70.30995432 W 149.09208131
3.61 5963796.68 612044.96 N 70.31003647 W 149.09209020
6.93 5963825.63 612043.57 N 70.31011562 W 149.09209794
8.93 5963856.33 612042.56 N 70.31019952 W 149.09210239
2.96 5963886.56 612042.09 N 70.31028214 W 149.09210254
4.41 5963916.27 612041.57 N 70.31036333 W 149.09210317
5.67 5963946.68 612041.18 N 70.31044640 W 149.09210263
2.66 5963977.75 612040.99 N 70.31053131 W 149.09210041
1.40 5964006.03 612040.76 N 70.31060857 W 149.09209893
2.61 5964037.57 612040.79 N 70.31069473 W 149.09209484
6.07 5964066.96 612040.61 N 70.31077502 W 149.0920
4.33 5964095.91 612040.34 N 70.31085413 W 149.09209139
0.50 5964126.96 612040.37 N 70.31093893 W 149.09208746
3.22 5964156.30 612040.12 N 70.31101912 W 149.09208588
1.88 5964185.10 612039.79 N 70.31109781 W 149.09208510
2.10 5964217.76 612039.37 N 70.31118704 W 149.09208455
0.33 5964249.71 612038.75 N 70.31127436 W 149.09208572
2.53 5964280.51 612037.92 N 70.31135853 W 149.09208872
2.07 5964312.47 612036.66 N 70.31144587 W 149.09209510
1.38 5964344.17 612035.10 N 70.31153256 W 149.09210389
1.17 5964372.07 612033.69 N 70.31160882 W 149.09211191
0.76 5964406.05 612032.11 N 70.31170172 W 149.09212059
3.39 5964437.29 612030.42 N 70.31178713 W 149.09213056
2.39 5964468.48 612028.49 N 70.31187240 W 149.09214240
1.79 5964500.26 612026.49 N 70.31195931 W 149.09215480
0.96 5964532.77 612024.26 N 70.31204820 W 149.09216894
1.54 5964563.71 612021.98 N 70.31213284 W 149.09218365
1.90 5964596.29 612019.55 N 70.31222193 W 149.0921
2.80 5964628.32 612017.46 N 70.31230953 W 149.0922
0.37 5964659.74 612015.60 N 70.31239543 W 149.09222372
4.65 5964691.08 612013.85 N 70.31248112 W 149.09223411
0.90 5964722.81 612012.24 N 70.31256787 W 149.09224334
1.95 5964756.41 612010.39 N 70.31265973 W 149.09225428
0.68 5964787.59 612008.55 N 70.31274498 W 149.09226536
1.00 5964819.36 612006.66 N 70.31283185 W 149.09227690
1.95 5964851.16 612004.80 N 70.31291881 W 149.09228810
1.63 5964882.56 612003.00 N 70.31300465 W 149.09229888
0.93 5964914.50 612001.03 N 70.31309199 W 149.09231102
3.56 5964946.21 611999.32 N 70.31317868 W 149.09232101
4.18 5964977.95 611997.75 N 70.31326548 W 149.09232989
SunreyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/2007 10:56 AM Page 5 of 8
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft tt ft ft ft ft ft de 00 ft ftUS ftUS
9461. /U
9493.75
9525.30
9557.65
9588.91
9620.95
9652.76
9685.38
9716.49
9749.32
9781.43
9812.90
9844.94
9876.39
9907.58
9940.00
9972.05
10003.53
10035.62
10067.83
10099.05
10131.38
10163.56
10195.00
10227.01
10259.56
10290.54
10322.44
10354.92
10386.25
10417.30
10448.78
10481.48
10511.69
10543.74
10575.57
10607.15
10639.13
10670.80
10703.41
10734.64
10767.36
t39.9U :Sb/.59 4CSC.U4 4yJy.i)U
89.80 357.46 4858.13 4939.65
88.47 358.65 4858.60 4940.12
88.74 358.91 4859.39 4940.91
88.46 0.61 4860.15 4941.67
89.25 0.58 4860.79 4942.31
90.66 0.79 4860.82 4942.34
91.04 0.98 4860.34 4941.86
91.14 1.52 4859.74 4941.26
90.56 1.97 4859.26 4940.78
89.63 2.68 4859.20 4940.72
89.49 3.11 4859.45 4940.97
89.49 1.52 4859.73 4941.25
89.70 2.18 4859.95 4941.47
89.90 1.84 4860.06 4941.58
89.97 2.70 4860.10 4941.62
89.87 1.16 4860.14 4941.66
90.52 2.35 4860.04 4941.56
90.49 2.69 4859.75 4941.27
90.38 2.31 4859.51 4941.03
90.52 1.44 4859.26 4940.78
90.21 0.98 4859.06 4940.58
90.01 1.48 4859.00 4940.52
89.84 1.78 4859.04 4940.56
89.77 1.00 4859.15 4940.67
89.56 0.50 4859.34 4940.86
88.74 359.22 4859.80 4941.32
89.25 359.12 4860.36 4941.88
89.63 359.62 4860.67 4942.19
87.79 358.70 4861.38 4942.90
88.57 357.39 4862.36 4943.88
88.53 358.16 4863.16 4944.68
87.74 356.96 4864.22 4945.74
88.02 357.50 4865.34 4946.86
88.05 356.24 4866.44 4947.96
87.88
86.90
87.98
88.64
87.48
357.10 4867.57 4949.09
358.99 4869.01 4950.53
358.76 4870.44 4951.96
0.71 4871.37 4952.89
1.68 4872.48 4954.00
88.36
88.12
51 /:S./V ~SIO.VL .71 /7.VV
5205.67 5348.07 5207.01
5237.15 5379.62 5238.53
5269.46 5411.96 5270.86
5300.69 5443.21 5302.11
5332.72 5475.24 5334.14
5364.53 5507.05 5365.95
5397.14 5539.67 5398.57
5428.24 5570.77 5429.67
5461.07 5603.60 5462.48
5493.18 5635.71 5494.57
5524.64 5667.18 5526.01
5556.67 5699.22 5558.02
5588.12 5730.66 5589.46
5619.31 5761.85 5620.64
5651.73 5794.27 5653.04
5683.77 5826.32 5685.07
5715.25 5857.80 5716.54
5747.34 5889.89 5748.61
5779.54 5922.10 5780.79
5810.76
5843.09
5875.27
5906.71
5938.72
5971.26
6002.23
6034.09
6066.55
6097.84
5953.32
5985.65
6017.83
6049.27
6081.28
6113.83
6144.81
6176.70
6209.18
6240.50
5812.00
5844.33
5876.50
5907.94
5939.94
5972.49
6003.46
6035.35
6067.83
6099.14
6128.82
6160.22
6192.82
6222.92
6254.85
6286.54
6318.03
6349.94
6381.58
6414.17
2.12 4873.61 4955.13 6445.38
1.61 4874.61 4956.13 6478.08
6271.53
6303.00
6335.69
6365.88
6397.91
6429.72
6461.26
6493.21
6524.87
6557.46
6588.67
6621.37
6130.15
6161.58
6194.23
6224.37
6256.35
6288.09
6319.61
6351.55
6383.21
6415.79
6446.99
6479.68
V 1 / ~i..74
5206.96
5238.49
5270.82
5302.07
5334.10
5365.91
5398.52
5429.62
5462.43
5494.51
5525.94
5557.95
5589.39
5620.56
5652.95
5684.98
5716.45
5748.50
5780.68
5811.88
5844.21
5876.38
5907.81
5939.81
5972.35
6003.33
6035.22
6067.70
6099.01
6130.03
6161.47
6194.13
6224.28
6256.26
6288.02
6319.55
6351.49
6383.14
6415.73
6446.92
6479.60
LJ.~/ V.OJ V.70.7V 1 V.J.7 V 1 1 A~:.I.AJ IY / V.J I JJJY 1 V YY 1 Y~.VJLJYVVV
22.59 0.51 5965042.38 611994.07 N 70.31344164 W 149.09235190
21.52 5.66 5965073.89 611992.53 N 70.31352777 W 149.09236057
20.83 1.16 5965106.20 611991.36 N 70.31361610 W 149.09236615
20.70 5.51 5965137.45 611990.77 N 70.31370147 W 149.09236721
21.03 2.47 5965169.48 611990.62 N 70.31378898 W 149.09236452
21.41 4.48 5965201.28 611990.53 N 70.31387587 W 149.09236143
21.92 1.30 5965233.90 611990.54 N 70.31396496 W 149.09235735
22.60 1.76 5965265.00 611990.76 N 70.31404992 W 149.09235185
23.60 2.24 5965297.82 611991.27 N 70.31413955 W 149.09234375
24.90 3.64 5965329.91 611992.09 N 70.31422720 W 149.0923
26.49
1.44
5965361.36
611993.21 3
N 70.31431306 W 149.0923
27.78 4.96 5965393.38 611994.03 N 70.31440052 W 149.0923
28.80 2.20 5965424.82 611994.58 N 70.31448639 W 149.09230159
29.89 126 5965456.00 611995.21 N 70.31457154 W 149.09229273
31.17 2.66 5965488.41 611996.01 N 70.31466004 W 149.09228232
32.25 4.82 5965520.45 611996.61 N 70.31474755 W 149.09227357
33.22 4.31 5965551.92 611997.10 N 70.31483351 W 149.09226576
34.63 1.06 5965584.00 611998.04 N 70.31492108 W 149.09225432
36.03 1.23 5965616.19 611998.96 N 70.31500899 W 149.09224293
37.06 2.82 5965647.40 611999.52 N 70.31509423 W 149.09223465
37.74 1.72 5965679.73 611999.72 N 70.31518254 W 149.09222912
38.43 1.67 5965711.90 611999.93 N 70.31527043 W 149.09222352
39.32 1.10 5965743.34 612000.35 N 70.31535628 W 149.09221627
40.10 2.45 5965775.34 612000.65 N 70.31544371 W 149.09220998
40.53 1.67 5965807.89 612000.59 N 70.31553262 W 149.09220652
40.45 4.91 5965838.86 612000.06 N 70.31561724 W 149.09220713
39.99 1.63 5965870.74 611999.12 N 70.31570437 W 149.09221088
39.63 1.93 5965903.20 611998.28 N 70.31579309 W 149.09221377
39.17 6.57 5965934.50 611997.35 N 70.31587865 W 149.0922
38.11 4.91 5965965.50 611995.83 N 70.31596338 W 149.09222607
36.89 2.45 5965996.92 611994.14 N 70.31604929 W 149.09223597
35.50 4.39 5966029.54 611992.26 N 70.31613849 W 149.09224724
34.04 2.01 5966059.67 611990.35 N 70.31622087 W 149.09225906
32.29 3.93 5966091.62 611988.13 N 70.31630824 W 149.09227323
30.44 2.75 5966123.34 611985.81 N 70.31639500 W 149.09228821
29.37 6.74 5966154.85 611984.26 N 70.31648113 W 149.09229693
28.74 3.45 5966186.77 611983.16 N 70.31656839 W 149.09230201
28.59 6.50 5966218.42 611982.54 N 70.31665486 W 149.09230320
29.27 4.64 5966251.01 611982.73 N 70.31674388 W 149.09229769
30.31 3.15 5966282.21 611983.30 N 70.31682909 W 149.09228930
31.37 1.72 5966314.90 611983.88 N 70.31691839 W 149.09228067
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/200710:56 AM Page 6 of 8
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
tt de de ft ft n n ft ft ft de 100 ft ftUS ftUS
lU/yy.bl t5t5.4b L.JJ
10832.27 89.11 2.24
10863.36 91.52 4.88
10895.59 92.51 6.20
10926.34 92.24 5.97
10958.44 91.17 6.22
10990.96 89.32 5.83
11022.95 88.01 5.41
11054.68 88.43 6.19
11086.46 88.57 5.98
11118.40 88.60 5.80
11149.94 88.70 6.06
11182.11 88.91 6.23
11213.86
11244.57
11277.41
11308.75
11340.38
11372.54
11404.64
11435.09
11467.00
11499.37
89.01 5.79
89.22 5.05
88.88 5.31
89.36 5.24
89.42 5.98
4C/J.O/
4876.27
4876.10
4874.96
4873.69
4872.74
4872.60
4873.34
4874.33
4875.16
4875.95
4876.69
4877.36
4877.94
4878.41
4878.96
4879.44
4879.77
88.40 6.33 4880.39
89.01 6.66 4881.11
89.46 6.14 4881.52
89.77 6.47 4881.73
90.04 6.68 4881.79
11531.85
11563.53
11595.54
11627.18
11658.52
11690.81
11722.10
11754.19
11787.29
11818.83
11850.94
11882.84
11913.99
11946.65
11978.50
12010.01
12042.37
12074.39
12105.24
90.14
89.66
89.66
87.85
88.22
88.77
89.01
89.29
89.53
89.90
90.14
89.18
87.66
88.33
88.70
88.94
88.22
88.67
89.05
4`JO / .U`J
4957.79
4957.62
4956.48
4955.21
4954.26
4954.12
4954.86
4955.85
4956.68
4957.47
4958.21
4958.88
4959.46
4959.93
4960.48
4960.96
4961.29
4961.91
4962.63
4963.04
4963.25
4963.31
6.90 4881.74 4963.26
8.13 4881.79 4963.31
8.36 4881.98 4963.50
9.68 4882.67 4964.19
10.01 4883.74 4965.26
9.30 4884.59
9.32 4885.20
9.52 4885.67
9.06 4886.01
9.45 4886.17
7.92 4886.16
8.37 4886.35
6.75 4887.21
7.55 4888.35
7.84 4889.18
7.31 4889.82
6.79 4890.63
6.64 4891.50
6.47 4892.11
4966.11
4966.72
4967.19
4967.53
4967.69
4967.68
4967.87
4968.73
4969.87
4970.70
4971.34
4972.15
4973.02
4973.63
OD I U.LL
6542.97
6574.03
6606.16
6636.79
6668.77
6701.19
6733.09
6764.72
6796.39
6828.23
6859.67
6891.73
6923.38
6954.01
6986.78
7018.05
7049.60
7081.65
7113.62
7143.96
7175.76
7208.01
7240.35
7271.86
7303.65
7335.01
7366.00
OOOJ.J I 0.7 I I .OV OJ 11./ G JG .'f0
6686.26 6544.53 6544.45 33 .78
6717.35 6575.57 6575.47 35 .71
6749.56 6607.64 6607.53 38 .82
6780.28 6638.21 6638.08 42 .08
6812.37 6670.14 6669.98 45 .49
6844.88 6702.50 6702.32 48 .90
6876.86 6734.35 6734.15 52 .03
6908.58 6765.93 6765.70 55.24
6940.35 6797.54 6797.29 58.60
6972.28 6829.33 6829.05 61.88
7003.81 6860.73 6860.42 65.14
7035.97 6892.74 6892.39 68.58
7067.72
7098.42
7131.26
7162.60
7194.22
7226.38
7258.47
7288.92
7320.83
7353.20
7385.67
7417.35
7449.36
7481.00
7512.32
7397.96 7544.60
7428.96 7575.88
7460.74 7607.97
7493.54 7641.06
7524.79 7672.60
7556.65 7704.71
7588.34 7736.61
7619.31 7767.75
7651.79 7800.39
7683.45 7832.23
7714.78 7863.73
7746.98 7896.08
7778.85 7928.09
7809.58 7958.93
6924.34 6923.96 71 .91
6954.94 6954.53 74 .81
6987.67 6987.23 77 .77
7018.90 7018.44 80 .65
7050.41 7049.91 83 .74
7082.42
7114.35
7144.65
7176.41
7208.61
7081.88
7113.77
7144.03
7175.74
7207.90
87.19
90.82
94.21
97.72
101.43
7240.92
7272.38
7304.13
7335.44
7366.39
7398.30
7429.25
7461.00
7493.76
7524.98
7556.81
7588.48
7619.42
7651.89
7683.53
7714.84
7747.03
7778.90
7809.62
7240.15
7271.56
7303.24
7334.48
7365.34
7397.16
7428.03
7459.68
7492.35
7523.48
7555.22
7586.79
7617.66
7650.05
7681.60
7712.83
7744.93
7776.72
7807.36
105.27
109.41
114.00
118.96
124.31
129.73
134.79
140.04
145.38
150.46
155.30
159.82
163.92
167.98
172.25
176.40
180.37
184.11
187.63
G.YV J.7VVJ"F/.VJ VI IJVY.:JI IV.JI/VVV IJ
2.00 5966379.77 611985.32 N 70.31709554 W 149.09226113
11.50 5966410.82 611986.79 N 70.31718029 W 149.09224549
5.12 5966442.91 611989.42 N 70.31726787 W 149.09222028
1.15 5966473.51 611992.22 N 70.31735133 W 149.09219389
3.42 5966505.46 611995.15 N 70.31743849 W 149.09216627
5.81 5966537.84 611998.08 N 70.31752684 W 149.09213861
4.30 5966569.71 612000.74 N 70.31761379 W 149.09211322
2.79 5966601.30 612003.47 N 70.31769999 W 149.09208724
0.79 5966632.93 612006.37 N 70.31778629 W 149.09205995
0.57 5966664.74 612009.17 N 70.31787306 W 149.092033 9
0.88 5966696.14 612011.96 N 70.31795874 W 149.0920
0.84 5966728.17 612014.93 N 70.31804610 W 149.0919
1.42 5966759.78 612017.78 N 70.31813235 W 149.09195213
2.50 5966790.39 612020.22 N 70.31821586 W 149.09192862
1.30 5966823.12 612022.70 N 70.31830519 W 149.09190459
1.55 .5966854.36 612025.11 N 70.31839044 W 149.09188123
2.35 5966885.88 612027.74 N 70.31847643 W 149.09185617
3.35 5966917.89 612030.71 N 70.31856377 W 149.09182822
2.16 5966949.83 612033.86 N 70.31865087 W 149.09179880
2.26 5966980.13 612036.80 N 70.31873353 W 149.09177128
1.42 5967011.89 612039.83 N 70.31882018 W 149.09174288
1.06 5967044.10 612043.06 N 70.31890803 W 149.09171283
0.74 5967076.40 612046.42 N 70.31899614 W 149.09168170
4.17 5967107.86 612050.09 N 70.31908194 W 149.09164811
0.72 5967139.60 612054.21 N 70.31916848 W 149.09161090
7.08 5967170.91 612058.70 N 70.31925383 W 149.09157070
1.58 5967201.84 612063.60 N 70.31933814 W 149.09152729
2.78 5967233.74 612068.53 N 70.31942507 W 149.0914
0.77 5967264.68 612073.13 N 70.31950941 W 149.0914
1.07 5967296.41 612077.91 N 70.31959588 W 149.09139980
1.57 5967329.14 612082.77 N 70.31968512 W 149.09135649
1.70 5967360.34 612087.37 N 70.31977016 W 149.09131536
4.82 5967392.15 612091.75 N 70.31985687 W 149.09127606
3.32 5967423.79 612095.80 N 70.31994314 W 149.09123942
7.13 5967454.71 612099.43 N 70.32002746 W 149.09120620
3.19 5967487.15 612103.01 N 70.32011594 W 149.09117327
1.48 5967518.76 612106.80 N 70.32020213 W 149.09113870
1.85 5967550.04 612110.49 N 70.32028745 W 149.09110503
2.74 5967582.20 612113.98 N 70.32037515 W 149.09107284
1.48 5967614.04 612117.25 N 70.32046200 W 149.09104250
1.35 5967644.73 612120.31 N 70.32054571 W 149.09101395
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-20412 Generated 3/28/2007 10:56 AM Page 7 of 8
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
tt de de tt ft tt tt ft tt tt de 100 tt ttUS ttUS
1213/.tiy i5y.4y O./3 48JG.J3 4y/4.U0 /o4G.IJ /ani.ao /OYG.IO /ooa.oL iai.iv L.VY JJV/V//.LJ
12169.28 89.66 5.44 4892.76 4974.28 7873.44 8022.97 7873.46 7871.06 194.16 1.07 5967708.51
12201.59 88.18 6.35 4893.37 4974.89 7905.65 8055.27 7905.66 7903.20 197.47 5.38 5967740.69
12233.56 88.60 7.25 4894.27 4975.79 7937.47 8087.23 7937.48 7934.93 201.26 3.11 5967772.47
12265.52 89.12 5.93 4894.90 4976.42 7969.30 8119.19 7969.31 7966.67 204.93 4.44 5967804.26
12296.70 89.18 6.52 4895.36 4976.88 8000.37 8150.36 8000.38 7997.66 208.31 1.90 5967835.30
12328.85 87.92 7.32 4896.18 4977.70 8032.37 8182.50 8032.37 8029.57 212.18 4.64 5967867.25
12360.79 87.92 7.42 4897.34 4978.86 8064.12 8214.42 8064.12 8061.22 216.27 0.31 5967898.96
12391.75 88.19 6.40 4898.39 4979.91 8094.93 8245.36 8094.93 8091.94 219.99 3.41 5967929.73
12424.26 89.49 7.35 4899.05 4980.57 8127.29 8277.86 8127.29 8124.21 223.89 4.95 5967962.05
12455.45 91.59 8.86 4898.75 4980.27 8158.27 8309.05 8158.28 8155.08 228.28 8.29 5967992.98
12487.62 91.69 9.07 4897.83 4979.35 8190.16 8341.21 8190.17 8186.85 233.29 0.72 5968024.82
12519.50 91.93 8.74 4896.82 4978.34 8221.76 8373.07 8221.78 8218.33 238.23 1.28 5968056.36
12551.27 92.34 8.79 4895.64 4977.16 8253.26 8404.82 8253.28 8249.70 243.06 1.30 5968087.81
12583.16 92.61 8.64 4894.26 4975.78 8284.87 8436.68 8284.91 8281.20 247.89 0.97 5968119.37
12615.32 92.58 7.68 4892.81 4974.33 8316.79 8468.81 8316.83 8313.00 252.45 2.98 5968151.23
12646.93 92.20 7.98 4891.49 4973.01 8348.18 8500.39 8348.24 8344.29 256.75 1.53 5968182.57
12679.32 92.00 8.73 4890.30 4971.82 8380.32 8532.76 8380.39 8376.31 261.46 2.39 5968214.66
12711.00 91.96 9.11 4889.21 4970.73 8411.72 8564.42 8411.81 8407.59 266.37 1.21 5968246.01
Last MWD+IFR+MS 12743.36 92.55 9.08 4887.93 4969.45 8443.77 8596.75 8443.88 8439.52 271.48 1.83 5968278.01
TD (Projected) 12804.00 92.55 9.08 4885.24 4966.76 8503.83 8657.33 8503.98 8499.34 281.04 0.00 5968337.96
Survey Type: Definitive Survey
NOTES: GYD CT DMS - (Gyrodata -cont. dri llpipe m/s -- Gyrodata pump-down multishot surveys with continuous tool (RGS-CT) in drill-pipe.)
Inc + Trend - (Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience enables
direction of drift to be predicted. Replaces ex-BP "I nclinometer (azimuth in known quadrant)" model.)
MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is appl ied to enhance inclination accuracy. )
Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS]
Surface : 4859 FSL 1177 FE L S21 T11 N R12E UM 5959836.12 61 2049.12
BHL : 2798 FSL 876 FEL S9 Ti 1 N R12E UM 5968337.96 61 2203.38
V IG ILV.VV IY /V.VLVVVtV~/ vv 11J.v~/vMV.IVL
612125.88 N 70.32071974 W 149.09096105
612128.72 N 70.32080752 W 149.09093415
612132.03 N 70.32089421 W 149.09090347
612135.23 N 70.32098093 W 149.09087373
612138.14 N 70.32106559 W 149.09084632
612141.54 N 70.32115276 W 149.09081492
612145.16 N 70.32123923 W 149.09078173
612148.42 N 70.32132315 W 149.09075154
612151.83 N 70.32141131 W 149.09071999
612155.77 N 70.32149565 W 149.09068
612160.31 N 70.32158243 W 149.0906
612164.77 N 70.32166843 W 149.09060372
612169.14 N 70.32175415 W 149.09056449
612173.49 N 70.32184018 W 149.09052535
612177.58 N 70.32192706 W 149.09048837
612181.41 N 70.32201253 W 149.09045348
612185.64 N 70.32210002 W 149.09041535
612190.08 N 70.32218547 W 149.09037554
612194.71 N 70.32227270 W 149.09033409
612203.38 N 70.32243612 W 149.09025657
SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-204\W-204\W-204L2\W-204L2 Generated 3/28/2007 10:56 AM Page 8 of 8
TREE = FMC 4-1l8" .5M
WELLHEAD = FMC GEN 5
ACTUATOR = Hydraulic
KB. ELEV = 81.52'
BF. ELEV = 53.69'
KOP = 2357'
Max Angle=L1 100 @ 6899
Datum MD = xxxx'
Datum ND = xxxx' SS
DRLG DRAFT
4-1/2" HES X NIP, ~ = 3.813"
GAS LIFT MANDRELS
ST MD ND DEV NPE VLV LATCH PORT DATE
4 2519 2518 6 KBG-2 DMY SBK-2 1" 02/28107
3 3509 3484 15 KBG-2 DMY SBK-2 1" 02/28/07
2 4865 4694 46 KBG-2 DMY SBK-2 1" 02/28/07
1 5102 4845 55 KBG-2 DCK BEK 1" 02/28/07
5221' 4.5" Baker CMD-BX Sliding Sleeve, 3.812" 10
5266' 7.625" x 4.5" Premier Packer 3.87" ~
5292' 4.5" HES X nipple W/ RHGM Plug, ID 3.813"
5313' 4.5" HES X nipple, ID 3.813"
5341' 4.5" Half Muleshoe stung into linertop packer, ID 3.958"
4.5" Phoenix CST-1 Jet Pump Gauge, ID = 3.994" ~- j 5243'
RA TAG 5317' ~
Seal Bore Extension, ID = 5.75" 5326'5337'
7-5/8" x 5.5" BKR ZXP PACKER, O = 4.82" 5337'
L2 BKR HUGHES HOOK HGR, ID = 5.62" 5361'
Minimum ID = 3.688" @ 5363',
& 5525' - LEM's
Seal Bore Extension, ID = 5.75" 5468'-5479'
7-5/8" x 5.5" BKR ZXP PACKER, ID = 4.82" 5479'
Seal Assembly from LEM#2 5496'
L2 BKR HUGHES HOOK HGR, 10 = 5.62" 5523'
RA TAG -{ $479' ~~
RA TAG (--( 5561'
Seal Bore Extension, ID = 5.75" 5607'-5618'
7-5/8" x 5.5" BKR ZXP PACKER, ID = 4.82" 5618'
7 5/8" x 5.5" BKR HMC Liner Hanger ID= 4.80" 5624'
Seal Assembly from LEM#1 5639'
7 5/8" CSG, 29.7# L-80 BTC, .0459 bpf, ID=6.875 I-'1 5847'
CGnU
4.5" 12.6# L-80 BTC Slotted (3.958" ID) 586b'-7414'
4.5" x 6.4" Swell Packer 3.9" ID - OBd 7424'-7444'
4.5" x 6.4" Swell Packer 3.9" ID - OBd 8005'-8024'
4.5" 12.6# L-80 BTC Slotted (3.958" ID) 8034'-9680'
4.5" x 6.4" Swell Packer 3.9" ID - OBd 9690'-9710'
4.5" x 6.4" Swell Packer 3.9" ~ - OBd 10105'-10125'
4.5" 12.6# L-80 BTC Slotted (3.958" ID) 10135'-12628'
4.5" 12.6# L-80 BTGSlotted xIBT-Solid Liner
Shoe - (PBTD 12628') OBd W-204
12628'
5378'-5384' Hook Hanger below window - 3.99" ID
5430'-5450' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa
6302'-6322' 4.5" x 6.4" Swell Packer 3.9" ID•L2-OBa
6332'-7369' 4.5" L-80 12.6# IBT Slotted Liner 3.958" ID L2-Oea
7389'-7408' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa
7881'-7901' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa
7913'-10399' 4.5" L-80 12.6# IBT Slotted Liner 3.958" ID L2-OBa
10401'-10524' 4.5" L-80 12.6# BTC Slotted liner 3.958" ID L2-OBa
10535'-10554' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa
10987'-11007' 4.5" x 6.4" Swell Packer 3.9" ID-L2-OBa
11017'-12716' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L2-OBa
12758' 4.5" 12.6# L-80 BTGIBT-Slotted xIBT-Solid Liner
Shoe - (PBTD 12,758') L2-OBa W-204
5540'-5547' Hook Hanger below window - 3.99" ID
5575'-5594' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc
6015'-7410' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L1-OBc
7421'-7440' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc
7795'-7814' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc
7824'-10389' 4.5" L-80 12.6# BTC Slotted liner 3.958" ID L1-OBc
10399'-10418' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc
10774'-10793' 4.5" x 6.4" Swell Packer 3.9" ID-L1-OBc
10803'-12656' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L1-OBc
4.5" 12.6# L-80 BTGSlotted xIBT-Solid Liner Shoe -
12702,
(PBTD 12,702') L1-OBc W-204
W-204 ~ As-Drilled Completion
W-204 L1
W-204 L2 z2os~ -
~20" CONDUCTOR ~ 110'
10 3/4" CSG., 45.5# L-80, .0962 bpf, ID= 9.95" 3338'
4.5"Phoenix Discharge Pressure sub. ID = 3.948" -521'
DATE REV BY COMMENTS DATE REV BY COMMENTS
03/02/07 MJM Original Completion (from drilling)
POLARIS UNIT
WELL: W-204, L1, L2
PERMfT No: 206-158, 159, 160
API No: 50-029-23333
SEC21, T11N, R12E, 4,859' FSL 81,176' FEL
BP Exploration (Alaska)
\ _
P
M
SCHLUMBERGER
Survey report
Client ...................:
Field ....................:
Well .....................:
API number ...............:
Engineer ..................
RIG :.....................:
STATE :...................:
----- Survey calculation m
Method for positions.....:
Method for DLS...........:
BP Exploration (Alaska) Inc.
Polaris
W-204L2
50-029-23333-61
F.Medina
Nabors-7ES
Alaska
ethods-------------
Minimum curvature
Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 52.60 ft
KB above permanent.......: NA Top Drive
DF above permanent.......: 81.52 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from Vsect Origin to target: 1.55 degrees
21-Feb-2007 14:02:39 Page 1 of 9
Spud date ................: 04-Jan-07
Last survey date.........: 21-Feb-07
Total accepted surveys...: 238
MD of first survey.......: 5258.85 ft
MD of last survey........: 12804.00 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2006
Magnetic date ............: 13-Feb-2007
Magnetic field strength..: 57638.78 LAMA
Magnetic dec (+E/W-).....: 23.86 degrees
Magnetic dip .............: 80.89 degrees
----- MWD survey Reference
Reference G ...............
Reference H ..............:
Reference Dip ............:
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 meal
57639.00 GAMA
80.89 degrees
(+/-) 2.50 meal
(+/-)300.00 GAMA
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 23.86 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 23.86 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ....
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
•
i~
SCHLLTMBERGER Survey Report 21-Feb-2007 14:02:39 Page 2 of 9
---
Seq --------
Measured ------
Incl -------
Azimuth ------
Course --------
TVD
Vertical
Displ
Displ
Total
At
DLS
Srvy Tool
## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
1 --------
5258.85 ------
60.10 ------
354.88
0.00
4929.92
1021.77
1013.31
326.65
1064.66
17.87
0.00
TIP None
2 5356.06 63.96 354.61 97.21 4975.50 1107.01 1098.79 318.78 1144.10 16.18 3.98 BP _MWD+IFR+MS
3 5366.00 64.36 354.74 9.94 4979.84 1115.89 1107.70 317.95 1152.43 16.02 4.19 BP _BLIND
4 5378.00 66.28 354.74 12.00 4984.85 1126.72 1118.55 316.95 1162.59 15.82 16.00 BP _BLIND
5 5396.79 68.13 355.66 18.79 4992.13 1143.93 1135.81 315.51 1178.82 15.52 10.83 BP _INC+TREND
6 5435.57 72.98 357.67 38.78 5005.03 1180.35 1172.31 313.39 1213.47 14.97 13.43 BP INC+TREND •
7 5467.94 76.82 359.32 32.37 5013.47 1211.56 1203.54 312.57 1243.47 14.56 12.84 BP -
INC+TREND
8 5500.77 80.63 1.02 32.83 5019.88 1243.74 1235.73 312.67 1274.67 14.20 12.67 BP _INC+TREND
9 5531.81 85.20 2.47 31.04 5023.71 1274.53 1266.51 313.61 1304.76 13.91 15.44 BP _MWD+IFR+MS
10 5563.04 89.25 3.49 31.23 5025.22 1305.71 1297.65 315.23 1335.39 13.65 13.37 BP _MWD+IFR+MS
11 5594.77 92.89 4.16 31.73 5024.63 1337.40 1329.30 317.35 1366.66 13.43 11.66 BP _MWD+IFR+MS
12 5627.94 94.68 4.97 33.17 5022.44 1370.45 1362.29 319.98 1399.37 13.22 5.92 BP _MWD+IFR+MS
13 5660.10 95.81 2.22 32.16 5019.50 1402.45 1394.25 321.99 1430.95 13.00 9.21 BP _MWD+IFR+MS
14 5692.73 95.09 359.95 32.63 5016.40 1434.93 1426.73 322.61 1462.75 12.74 7.27 BP _MWD+IFR+MS
15 5723.93 93.75 358.29 31.20 5014.00 1466.01 1457.83 322.13 1492.99 12.46 6.83 BP _MWD+IFR+MS
16 5755.74 94.09 358.35 31.81 5011.82 1497.69 1489.55 321.20 1523.79 12.17 1.09 BP _MWD+IFR+MS
17 5788.13 94.26 357.72 32.39 5009.46 1529.94 1521.84 320.09 1555.13 11.88 2.01 BP _MWD+IFR+MS
18 5818.88 94.40 357.59 30.75 5007.14 1560.53 1552.47 318.84 1584.87 11.61 0.62 BP _MWD+IFR+MS
19 5850.23 93.75 354.69 31.35 5004.91 1591.66 1583.67 316.73 1615.03 11.31 9.46 BP _MWD+IFR+MS
20 5882.76 93.23 352.89 32.53 5002.93 1623.83 1615.95 313.22 1646.02 10.97 5.75 BP _MWD+IFR+MS
21 5914.44 92.58 353.04 31.68 5001.33 1655.11 1647.35 309.34 1676.14 10.64 2.11 BP _MWD+IFR+MS
22 5946.61 90.80 350.37 32.17 5000.38 1686.79. 1679.16 304.70 1706.58 10.29 9.97 BP _MWD+IFR+MS
23 5977.89 89.87 348.87 31.28 5000.20 1717.39 1709.93 299.07 1735.89 9.92 5.64 BP _MWD+IFR+MS
24 6010.28 89.84 348.24 32.39 5000.28 1748.95 1741.67 292.64 1766.09 9.54 1.95 BP _MWD+IFR+MS
25 6041.66 91.00 348.99 31.38 5000.05 1779.53. 1772.44 286.45 1795.43 9.18 4.40 BP _MWD+IFR+MS
26 6073.90 91.76 349.89 32.24 4999.27 1811.05 1804.12 280.54 1825.80 8.84 3.65 BP _MWD+IFR+MS
27 6106.16 91.76 350.34 32.26 4998.28 1842.65 1835.89 275.00 1856.37 8.52 1.39 BP _MWD+IFR+MS
28 6136.63 91.72 348.70 30.47 4997.36 1872.44 1865.83 269.47 1885.19 8.22 5.38 BP _MWD+IFR+MS
29 6168.40 92.34 349.29 31.77 4996.23 1903.43 1897.00 263.40 1915.20 7.91 2.69 BP _MWD+IFR+MS
30 6200.52 91.48 349.60 32.12 4995.16 1934.82 1928.56 257.52 1945.67 7.61 2.85 BP _MWD+IFR+MS
SCHLUMBERGER Survey Report
21-Feb-2007 14:02:39
Page 3 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
31 6232 63 91.17 350.26 32.11 4994.42 1966.26 1960.16 251.91 1976.28 7.32 2.27 BP _MWD+IFR+MS
32 6264.40 92.24 351.79 31.77 4993.47 1997.48 1991.53 246.96 2006.78 7.07 5.87 BP _MWD+IFR+MS
33 6296.05 92.82 352.69 31.65 4992.07 2028.68 2022.86 242.69 2037.36 6.84 3.38 BP _MWD+IFR+MS
34 6328.39 91.93 353.73 32.34 4990.73 2060.65 2054.94 238.87 2068.78 6.63 4.23 BP _MWD+IFR+MS
35 6359.76 91.38 354.39 31.37 4989.83 2091.74 2086.13 235.62 2099.40 6.44 2.74 BP _MWD+IFR+MS
36 6391.92 91.48 353.44 -32.16 4989.03 2123.61 2118.10 232.21 2130.79 6.26 2.97 BP _MWD+IFR+MS
37 6423.26 91.21 353.43 31.34 4988.29 2154.62 2149.23 228.63 2161.35 6.07 0.86 BP _MWD+IFR+MS
38 6455.13 91.11 353.51 31.87 4987.65 2186.17 2180.88 225.01 2192.46 5.89 0.40 BP _MWD+IFR+MS
39 6486.99 91.35 352.91 31.86 4986.96 2217.69 2212.51 221.24 2223.55 5.71 2.03 BP _MWD+IFR+MS
40 6519.21 91.35 353.82 32.22 4986.20 2249.57 2244.51 217.52 2255.02 5.54 2.82 BP _MWD+IFR+MS
41 6551.24 91.14 354.11 32.03 4985.51 2281.31 2276.35 214.15 2286.40 5.37 1.12 BP _MWD+IFR+MS
42 6582.10 91.24 353.30 30.86 4984.86 2311.88 2307.02 210.77 2316.63 5.22 2.64 BP _MWD+IFR+MS
43 6614.87 91.41 354.82 32.77 4984.11 2344.36 2339.60 207.38 2348.78 5.07 4.67 BP _MWD+IFR+MS
44 6647.08 90.93 354.82 32.21 4983.45 2376.34 2371.67 204.47 2380.47 4.93 1.49 BP _MWD+IFR+MS
45 6678.31 90.90 354.87 31.23 4982.95 2407.35 2402.77 201.67 2411.22 4.80 0.19 BP _MWD+IFR+MS
46 6710.36 90.90 354.47 32.05 4982.45 2439.17 2434.68 198.69 2442.78 4.67 1.25 BP _MWD+IFR+MS
47 6741.91 91.24 354.19 31.55 4981.86 2470.46 2466.07 195.57 2473.81 4.53 1.40 BP _MWD+IFR+MS
48 6773.46 91.45 354.19 31.55 4981.12 2501.74 2497.45 192.38 2504.85 4.40 0.67 BP _MWD+IFR+MS
49 6805.16 91.65 353.58 31.70 4980.26 2533.15 2528.96 189.01 2536.01 4.27 2.02 BP _MWD+IFR+MS
50 6837.17 91.72 354.18 32.01 4979.32 2564.86 2560.77 185.60 2567.49 4.15 1.89 BP _MWD+IFR+MS
51 6869.05 91.34 353.83 31.88 4978.47 2596.45 2592.47 182.27 2598.87 4.02 1.62 BP _MWD+IFR+MS
52 6900.47 90.66 355.08 31.42 4977.92 2627.62 2623.73 179.23 2629.85 3.91 4.53 BP _MWD+I°FR+MS
53 6932.58 90.87 355.38 32.11 4977.49 2659.53 2655.73 176.56 2661.59 3.80 1.14 BP _MWD+IFR+MS
54 6963.59 91.17 355.36 31.01 4976.94 2690.36 2686.63 174.06 2692.27 3.71 0.97 BP _MWD+IFR+MS
55 6995.61 91.96 355.91 32.02 4976.06 2722.20 2718.55 171.62 2723.96 3.61 3.01 BP _MWD+IFR+MS
56 7028.03 92.31 356.07 32.42 4974.86 2754.44 2750.87 169.36 2756.07 3.52 1.19 BP _MWD+IFR+MS
57 7059.90 92.27 355.94 31.87 4973.58 2786.14 2782.63 167.14 2787.65 3.44 0.43 BP _MWD+IFR+MS
58 7091.82 92.51 356.00 31.92 4972.25 2817.88 2814.45 164.90 2819.27 3.35 0.77 BP _MWD+IFR+MS
59 7122.97 92.96 355.70 31.15 4970.76 2848.84 2845.48 162.65 2850.13 3.27 1.74 BP _MWD+IFR+MS
60 7154.94 92.14 355.47 31.97 4969.34 2880.60 2877.32 160.19 2881.78 3.19 2.66 BP _MWD+IFR+MS
r1
L~
~~
' SCHLUMBERGER Survey Report
21-Feb-2007 14:02:39
Page 4 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg)
61 7187.71 91.59 355.62 32.77 4968.28 2913.18 2909.98 157.64 2914.24 3.10 1.74 BP _MWD+IFR+MS
62 7220.40 91.38 355.54 32.69 4967.43 2945.68 2942.56 155.12 2946.64 3.02 0.69 BP _MWD+IFR+MS
63 7252.44 91.76 355.30 32.04 4966.55 2977.52 2974.48 152.57 2978.39 2.94 1.40 BP _MWD+IFR+MS
64 7283.69 92.48 355.59 31.25 4965.39 3008.57 3005.61 150.09 3009.36 2.86 2.48 BP _MWD+IFR+MS
65 7315.42 92.00 354.74 31.73 4964.15 3040.08 3037.21 147.41 3040.78 2.78 3.07 BP _MWD+IFR+MS
66 7347.62 91.07 353.88 32.20 4963.29 3072.01. 3069.24 144.22 3072.62 2.69 3.93 BP _MWD+IFR+MS
67 7379.10 91.48 354.32 31.48 4962.59 3103.2.2 3100.54 140.99 3103.75 2.60. 1.91 BP _MWD+IFR+MS
68 7412.14 91.69 354.31 33.04 4961.68 3135.98 3133.41 137.72 3136.43 2.52 0.64 BP _MWD+IFR+MS
69 7443.32 91.89 353.31 31.18 4960.70 3166.86 3164.39 134.36 3167.24 2.43 3.27 BP _MWD+IFR+MS
70 7474.25 91.76 352.66 30.93 4959.72 3197.43 3195.07 130.58 3197.74 2.34 2.14 BP _MWD+IFR+MS
71 7507.06 89.25 351.81 32.81 4959.43 3229.81 3227.58 126.15 3230.04 2.24 8.08 BP _MWD+IFR+MS
72 7538.72 86.65 351.88 31.66 4960.56 3260.99 3258.89 121.66 3261.16 2.14 8.22 BP _MWD+IFR+MS
73 7570.28 86.16 351.45 31.56 4962.54 3292.02 3290.06 117.09 3292.14 2.04 2.06 BP _MWD+IFR+MS
74 7602.47 86.61 350.15 32.19 4964.57 3323.58 3321.77 111.96 3323.66 1.93 4.27 BP _MWD+IFR+MS
75 7635.13 86.44 351.43 32.66 4966.55 3355.61 3353.95 106.74 3355.65 1.82 3.95 BP _MWD+IFR+MS
76 7666.93 86.20 349.88 31.80 4968.59 3386.77 3385.26 101.59 3386.79 1.72 4.92 BP _MWD+IFR+MS
77 7699.40 86.61 349.95 32.47 4970.63 3418.51 3417.17 95.91 3418.51 1.61 1.28 BP _MWD+IFR+MS
78 7731.78 86.58 350.60 32.38 4972.55 3450.21 3449.03 90.45 3450.21 1.50 2.01 BP _MWD+IFR+MS
79 7763.19 86.82 351.17 31.41 4974.36 3481.03 3479.99 85.49 3481.04 1.41 1.97 BP _MWD+IFR+MS
80 7796.25 86.88 350.66 33.06 4976.17 3513.47 3512.58 80.27 3513.50 1.31 1.55 BP _MWD+IFR+MS
81 7827.33 86.75 351.56 31.08 4977.90 3543.99 3543.24 75.48 3544.05 1.22 2.92 BP _MWD+IFR+MS
82 7856.57 87.06 353.91 29.24 4979.48 3572.84 3572.20 71.79 3572.92 1.15 8.09 BP _MWD+IFR+MS
83 7886.48 87.40 353.10 29.91 4980.93 3602.42 3601.89 68.41 3602.54 1.09 2.93 BP _MWD+IFR+MS
84 7916.15 87.50 355.57 29.67 4982.25 3631.82 3631.38 65.48 3631.97 1.03 8.32 BP _MWD+IFR+MS
85 7946.49 87.37 357.50 30.34 4983.60 3662.01 3661.63 63.65 3662.19 1.00 6.37 BP _MWD+IFR+MS
86 7976.57 88.09 358.78 30.08 4984.80 3692.02 3691.67 62.67 3692.20 0.97 4.88 BP _MWD+IFR+MS
87 8006.70 88.94 358.55 30.13 4985.58 3722.10 3721.78 61.97 3722.30 0.95 2.92 BP _MWD+IFR+MS
88 8036.72 91.51 359.65 30.02 4985.46 3752.09 3751.80 61.50 3752.30 0.94 9.31 BP _MWD+IFR+MS
89 8066.96 91.14 358.95 30.24 4984.76 3782.30 3782.03 61.13 3782.52 0.93 2.62 BP _MWD+IFR+MS
90 8095.88 90.97 358.02 28.92 4984.23 3811.17 3810.93 60.37 3811.41 0.91 3.27 BP _MWD+IFR+MS
SCHLUMBERGER Survey Report 21-Feb-2007 14:02:39 Page 5 of 9
___
Seq ________
Measured ______
Incl _______
Azimuth ______
Course ________
TVD ________
Vertical _____p
Dis 1
Dis 1
P
Total
At
DLS
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
91
8126 10 ------
90.76 -------
357.86 ------
30.22 --------
4983.77 -----
3841.33
3841.13
59.28
3841.59
0.88
0.87
BP
_MWD+IFR+MS
92 8155.90 90.66 357.46 29.80 4983.40 3871.05 3870.90 58.06 3871.34 0.86 1.38 BP _MWD+IFR+MS
93 8185.74 90.59 358.38 29.84 4983.08 3900.83 3900.72 56.98 3901.14 0.84 3.09 BP _MWD+IFR+MS
94 8215.48 89.51 357.85 29.74 4983.05 3930.52 3930.44 56.00 3930.84 0.82 4.05 BP _MWD+IFR+MS
95 8245.57 90.59 357.97 30.09 4983.02 3960.55 3960.51 54.91 3960.89 0.79 3.61 BP _MWD+IFR+MS
96 8274.56 88.60 358.25 28.99 4983.23 3989.48 3989.48 53.95 3989.85 0.77 6.93 BP _MWD+IFR+MS
97 8305.28 90.93 359.70 30.72 4983.35 4020.17 4020.20 53.40 4020.55 0.76. 8.93 BP _MWD+IFR+MS
98 8335.53 91.65 0.23 30.25 4982.67 4050.40 4050.44 53.38 4050.79 0.76 2.96 BP_ MWD+IFR+MS
99 8365.27 92.72 359.47 29.74 4981.54 4080.10 4080.15 53.30 4080.50 0.75 4.41 BP_ MWD+IFR+MS
100 8395.73 93.85 0.78 30.46 4979.79 4110.50 4110.56 53.37 4110.91 0.74 5.67 BP_ MWD+ZFR+MS
101 8426.87 93.23 0.23 31.14 4977.87 4141.58 4141.64 53.64 4141.99 0.74 2.66 BP_ MWD+IFR+MS
102 8455.20 93.51 0.51 28.33 4976.21 4169.85 4169.92 53.83 4170.27 0.74 1.40 BP_ MWD+IFR+MS
103 8486.80 93.34 1.32 31.60 4974.32 42.01.39 4201.46 54.33 4201.81 0.74 2.61 BP _MWD+IFR+MS
104 8516.23 92.58 359.70 29.43 4972.80 4230.78 4230.85 54.59 4231.20 0.74 6.07 BP _MWD+IFR+MS
105 8545.22 92.72 0.95 28.99 4971.46 4259.73 4259.81 54.76 4260.16 0.74 4.33 BP _MWD+IFR+MS
106 8576.30 92.61 0.84 31.08 4970.01 4290.77 4290.85 55.24 4291.21 0.74 0.50 BP _MWD+IFR+MS
107 8605.68 92.38 359.92 29.38 4968.73 4320.12 4320.20 55.44 4320.56 0.74 3.22 BP _MWD+IFR+MS
108 8634.51 92.44 0.46 28.83 4967.52 4348.92 4349.01 55.53 4349.36 0.73 1.88 BP _MWD+IFR+MS
109 8667.20 92.34 359.78 32.69 4966.16 4381.57 4381.67 55.60 4382.02 0.73 2.10 BP _MWD+IFR+MS
110 8699.19 92.41 359.70 31.99 4964.83 4413.52 4413.63 55.45 4413.98 0.72 0.33 BP _MWD+IFR+MS
111 8730.03 92.41 358.92 30.84 4963.54 4444.30 4444.44 55.08 4444.78 0.71 2.53 BP _MWD+IFR+MS
112 8762.04 92.48 358.26 32.01 4962.17 4476.24 4476.41 54.30 4476.74 0.69 2.07 BP _MWD+IFR+MS
113 8793.82 92.48 357.82 31.78 4960.79 4507.93 4508.14 53.21 4508.46 0.68 1.38 BP _MWD+IFR+MS
114 8821.78 92.61 358.12 27.96 4959.55 4535.81 4536.06 52.22 4536.36 0.66 1.17 BP _MWD+IFR+MS
115 8855.84 92.82 358.27 34.06 4957.94 4569.77 4570.06 51.15 4570.35 0.64 0.76 BP _MWD+IFR+MS
116 8887.17 92.99 357.22 31.33 4956.35 4600.99 4601.33 49.92 4601.60 0.62 3.39 BP _MWD+IFR+MS
117 8918.45 92.27 357.42 31.28 4954.92 4632.16 4632.54 48.46 4632.79 0.60 2.39 BP _MWD+IFR+MS
118 8950.33 92.72 357.07 31.88 4953.53 4663.92 4664.35 46.93 4664.59 0.58 1.79 BP _MWD+IFR+MS
119 8982.95 92.58 356.79 32.62 4952.02 4696.39 4696.89 45.18 4697.11 0.55 0.96 BP _MWD+IFR+MS
120 9014.01 92.20 356.50 31.06 4950.73 4727.31 4727.87 43.36 4728.07 0.53 1.54 BP _MWD+IFR+MS
SCHLUMBERGER Survey Report
21-Feb-2007 14:02:39
Page 6 of 9
Seq Measured Incl Azimuth Course --------
TVD --------
Vertical ---------
Displ ------
Displ Total At DLS Srvy Tool
##
depth
angle
angle
length
depth
section
+N/S-
+E/W-
dis 1
P
Azim
(de /
9
tool Corr
- (f t) (deg) (deg) (ft) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg)
121 9046.71 92 79 356 70 32.70 4949.30 4759.86 4760.48 41.43 4760.66 0.50 1.90 BP_ MWD+IFR+MS
122 9078.86 93.16 357.52 32.15 4947.63 4791.87 4792.55 39.81 4792.71 0.48 2.79 BP_ MWD+IFR+MS
123 9110.38 93.10 357.42 31.52 4945.91 4823.26 4823.99 38.42 4824.14 0.46 0.37 BP_ MWD+IFR+MS
124 9141.80 91.72 357.90 31.42 4944.59 4854.58 4855.35 37.14 4855.50 0.44 4.65 BP_ MWD+IFR+MS
125 9173.59 91.45 357.99 31.79 4943.71 4886.30 4887.11 36.00 4887.25 0.42 0.90 BP_ MWD+IFR+MS
126 9207.25 91.14 357.41 33.66 4942.95 4919.87 4920.74 34.65 4920.86 0.40 1.95 BP_ MWD+IFR+MS
127 9238.49 91.28 357.57 31.24 4942.29 4951.03 4951.94 33.28 4952.05 0.39 0.68 BP_ MWD+IFR+MS
128 9270.33 91.45 357.30 31.84 4941.53 4982.78 4983.74 31.86 4983.84 0.37 1.00 BP_ MWD+IFR+MS
129 9302.20 91.00 357.73 31.87 4940.85 5014.56 5015.57 30.47 5015.66 0.35 1.95 BP_ MWD+IFR+MS
130 9333.65 90.59 357.42 31.45 4940.42 5045.93 5046.99 29.14 5047.07 0.33 1.63 BP_ MWD+IFR+MS
131 9365.66 90.80 357.21 32.01 4940.03 5077.85 5078.96 27.64 5079.04 0.31 0.93 BP_ MWD+IFR+MS
132 9397.42 90.83 358.34 31.76 4939.58 5109.54 5110.69 26.41 5110.76 0.30 3.56 BP_ MWD+IFR+MS
133 9429.21 89.66 357.71 31.79 4939.44 5141.27 5142.46 25.32 5142.53 0.28 4.18 BP_ MWD+IFR+MS
134 9461.70 89.90 357.59 32.49 4939.56 5173.68 5174.93 23.98 5174.98 0.27 0.83 BP_ MWD+IFR+MS
135 9493.75 89.80 357.46 32.05 4939.65 5205.65 5206.95 22.60 5206.99 0.25 0.51 BP_ MWD+IFR+MS
136 9525.30 88.47 358.65 31.55 4940.12 5237.14 5238.47 21.53 5238.52 0.24 5.66 BP_ MWD+IFR+MS
137 9557.65 88.74 358.91 32.35 4940.91 5269.44 5270.81 20.84. 5270.85 0.23 1.16 BP_ MWD+IFR+MS
138 9588.91 88.46 0.61 31.26 4941.68 5300.68 5302.06 20.71 5302.10 0.22 5.51 BP_ MWD+IFR+MS
139 9620.95 89.25 0.58 32.04 4942.32 5332.70 5334.09 21.04 5334.13 0.23 2.47 BP_ MWD+IFR+MS
140 9652.76 90.66 0.79 31.81 4942.34 5364.51 5365.89 21.42 5365.94 0.23 4.48 BP_ MWD+IFR+MS
141 9685.38 91.04 0.98 32.62 4941.86 5397.12 5398.51 21.93 5398.55 0.23 1.30 BP_ MWD+IFR+MS
142 9716.49 91.14 1.52 31.11 4941.26 5428.23 5429.60 22.60 5429.65 0.24 1.76 BP_ MWD+IFR+MS
143 9749.32 90.56 1.97 32.83 4940.78 5461.05 5462.41 23.60 5462.47 0.25 2.24 BP_ MWD+IFR+MS
144 9781.43 89.63 2.68 32.11 4940.72 5493.16 5494.50 24.91 5494.55 0.26 3.64 BP_ MWD+IFR+MS
145 9812.90 69.49 3.11 31.47 4940.97 5524.62 5525.93 26.50 5525.99 0.27 1.44 BP _MWD+IFR+MS
146 9844.94 89.49 1.52 32.04 4941.25 5556.66 5557.94 27.79 5558.01 0.29 4.96 BP _MWD+IFR+MS
147 9876.39 89.70 2.18 31.45 4941.47 5588.10 5589.37 28.81 5589.44 0.30 2.20 BP _MWD+IFR+MS
148 9907.58 89.90 1.84 31.19 4941.58 5619.29 5620.54 29.90 5620.62 0.30 1.26 BP _MWD+IFR+MS
149 9940.00 89.97 2.70 32.42 4941.62 5651.71 5652.94 31.18 5653.02 0.32 2.66 BP _MWD+IFR+MS
150 9972.05 89.87 1.16 32.05 4941.66 5683.76 5684.97 32.26 5685.06 0.33 4.82 BP _MWD+IFR+MS
•
•
~SCHLUMBERGER Survey Report
21-Feb-2007 14:02:39
Page 7 of 9
___
Seq
Measured ------
Incl -------
Azimuth ------
Course --------
TVD --------
Vertical -----p
Dis 1
Dis 1
P
Total
At
DLS
Srvy Tool
## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (f t) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg)
151 10003 53 90 52 2 35 31.48 4941.56 5715 24 5716.43 33.23 5716.53 0.33 4.31 BP_ MWD+IFR+MS
152 10035.62 90.49 2.69 32.09 4941.27 5747.32 5748.49 34.64 5748.59 0.35 1.06 BP_ MWD+IFR+MS
153 10067.83 90.38 2.31 32.21 4941.03 5779.53 5780.67 36.04 . 5780.78 0.36 1.23 BP_ MWD+IFR+MS
154 10099.05 90.52 1.44 31.22 4940.78 5810.74 5811.87 37.06 5811.99 0.37 2.82 BP_ MWD+IFR+MS
155 10131.38 90.21 0.98 32.33 4940.58 5843.07 5844.19 37.75 5844.31 0.37 1.72 BP_ MWD+IFR+MS
156 10163.56 90.01 1.48 32.18 4940.52 5875.25 5876.36 38.44 5876.49 0.37 1.67 BP_ MWD+IFR+MS
157 10195.00 89.84 1.78 31.44 4940.56 5906.69 5907.79 39.33 5907.92 0.38 1.10 BP_ MWD+IFR+MS
158 10227.01 89.77 1.00 32.01 4940.67 5938.70 5939.79 40.11 5939.93 0.39 2.45 BP_ MWD+IFR+MS
159 10259.56 89.56 0.50 32.55 4940.86 5971.25 5972.34 40.53 5972.47 0.39 1.67 BP_ MWD+IFR+MS
160 10290.54 88.74 359.22 30.98 4941.32 6002.21 6003.31 40.46 6003.45 0.39 4.91 BP_ MWD+IFR+MS
161 10322.44 89.25 359.12 31.90 4941.88 6034.08 6035.20 40.00 6035.34 0.38 1.63 BP_ MWD+IFR+MS
162 10354.92 89.63 359.62 32.48 4942.19 6066.53 6067.68 39.64 6067.81 0.37 1.93 BP_ MWD+IFR+MS
163 10386.25 87.79 358.70 31.33 4942.90 6097.83 6099.00 39.18 6099.12 0.37 6.57 BP_ MWD+IFR+MS
164 10417.30 88.57 357.39 31.05 4943.88 6128.80 6130.01 38.12 6130.13 0.36 4.91 BP_ MWD+IFR+MS
165 10448.78 88.53 358.16 31.48 4944.68 6160.20 6161.46 36.90 6161.57 0.34 2.45 BP_ MWD+IFR+MS
166 10481.48 87.74 356.96 32.70 4945.75 6192.80 6194.11 35.51 6194.21 0.33 4.39 BP_ MWD+IFR+MS
167 10511.69 88.02 357.50 30.21 4946.86 6222.91 6224.26 34.05 6224.36 0.31 2.01 BP_ MWD+IFR+MS
168 10543.74 88.05 356.24 32.05 4947.96 6254.83 6256.25 32.30 6256.33 0.30 3.93 BP_ MWD+IFR+MS
169 10575.57 87.88 357.10 31.83 4949.09 6286.53 6288.00 30.45 6288.08 0.28 2.75 BP_ MWD+IFR+MS
170 10607.15 86.90 358.99 31.58 4950.53 6318.01 6319.53 29.38 6319.60 0.27 6.74 BP_ MWD+IFR+MS
171 10639.13 87.98 358.76 31.98 4951.96 6349.92 6351.47 28.75 6351.54 0.26 3.45 BP_ MWD+IFR+MS
172 10670.80 88.64 0.71 31.67 4952.89 6381.56 6383.13 28.60 6383.19 0.26 6.50 BP_ MWD+IFR+MS
173 10703.41 87.48 1.68 32.61 4954.00 6414.15 6415.71 29.28 6415.78 0.26 4.64 BP_ MWD+IFR+MS
174 10734.64 88.36 2.12 31.23 4955.13 6445.36 6446.90 30.32 6446.97 0.27 3.15 BP_ MWD+IFR+MS
175 10767.36 88.12 1.61 32.72 4956.14 6478.07 6479.59 31.38 6479.66 0.28 1.72 BP_ MWD+IFR+MS
176 10799.51 88.46 2.33 32.15 4957.09 6510.20 6511.70 32.49 6511.79 0.29 2.48 BP_ MWD+IFR+MS
177 10832.27 89.11 2.24 32.76 4957.79 6542.95 6544.43 33.79 6544.52 0.30 2.00 BP _MWD+IFR+MS
178 10863.36 91.52 4.88 31.09 4957.62 6574.02 6575.46 35.72 6575.55 0.31 11.50 BP _MWD+IFR+MS
179 10895.59 92.51 6.20 32.23 4956.49 6606.15 6607.51 38.83 6607.63 0.34 5.12 BP _MWD+IFR+MS
180 10926.34 92.24 5.97 30.75 4955.21 6636.77 6638.06 42.09 6638.20 0.36 1.15 BP _MWD+IFR+MS
~~
~SCHLUMBERGER Survey Report
21-Feb-2007 14:02:39
Page 8 of 9
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg)
181 10958 44 91.17 6.22 32 10 4954.26 6668.76 6669.97 45.50 6670.12 0.39 3.42 BP_ MWD+IFR+MS
182 10990.96 89.32 5.83 32.52 4954.12 6701.18 6702.31 48.91 6702.48 0.42 5.81 BP_ MWD+IFR+MS
183 11022.95 88.01 5.41 31.99 4954.86 6733.08 6734.13 52.04 6734.33 0.44 4.30 BP_ MWD+IFR+MS
184 11054.68 88.43 6.19 31.73 4955.85 6764.70 6765.69 55.25 6765.91 0.47 2.79 BP_ MWD+IFR+MS
185 11086.46 88.57 5.98 31.78 4956.68 6796.37 6797.28 58.61 6797.53 0.49 0.79 BP_ MWD+IFR+MS
186 11118.40 88.60 5.80 31.94 4957.47 6828.21 6829.04 61.89 6829.32 0.52 0.57 BP_ MWD+IFR+MS
187 11149.94 88.70 6.06 31.54 4958.21 6859.65 6860.40 65.15 6860.71 0.54 0.88 BP_ MWD+IFR+MS
188 11182.11 88.91 6.23 32.17 4958.88 6891.71 6892.38 68.59 6892.72 0.57 0.84 BP_ MWD+IFR+MS
189 11213.86 89.01 5.79 31.75 4959.46 6923.36 6923.95 71.91 6924.32 0.60 1.42 BP_ MWD+IFR+MS
190 11244.57 89.22 5.05 30.71 4959.93 6954.00 6954.52 74.81 6954.92 0.62 2.50 BP_ MWD+IFR+MS
191 11277.41 88.88 5.31 32.84 4960.48 6986.77 6987.22 77.78 6987.65 0.64 1.30 BP_ MWD+IFR+MS
192 11308.75 89.36 5.24 31.34 4960.96 7018.04 7018.42 80.66 7018.88 0.66 1.55 BP_ MWD+IFR+MS
193 11340.38 89.42 5.98 31.63 4961.29 7049.58 7049.90 83.75 7050.40 0.68 2.35 BP_ MWD+IFR+MS
194 11372.54 88.40 6.33 32.16 4961.91 7081.63 7081.87 87.20 7082.40 0.71 3.35 BP_ MWD+IFR+MS
195 11404.64 89.01 6.66 32.10 4962.63 7113.61 7113.75 90.83 7114.33 0.73 2.16 BP_ MWD+IFR+MS
196 11435.09 89.46 6.14 30.45 4963.04 7143.94 7144.01 94.22 7144.63 0.76 2.26 BP_ MWD+IFR+MS
197 11467.00 89.77 6.47 31.91 4963.25 7175.74 7175.73 97.73 7176.39 0.78 1.42 BP_ MWD+IFR+MS
198 11499.37 90.04 6.68 32.37 4963.31 7207.99 7207.88 101.43 7208.60 0.81 1.06 BP_ MWD+IFR+MS
199 11531.85 90.14 6.90 32.48 4963.26 7240.33 7240.13 105.27 7240.90 0.83 0.74 BP_ MWD+IFR+MS
200 11563.53 89.66 8.13 31.68 4963.31 7271.84 7271.54 109.42 7272.37 0.86 4.17 BP_ MWD+IFR+MS
201 11595.54 89.66 8.36 32.01 4963.50 7303.63 7303.22 114.01 7304.11 0.89 0.72 BP_ MWD+IFR+MS
202 11627.18 87.85 9.68 31.64 4964.19 7334.99 7334.46 118.97 7335.42 0.93 7.08 BP_ MWD+IFR+MS
203 11658.52 88.22 10.01 31.34 4965.26 7365.99 7365.32 124.32 7366.37 0.97 1.58 BP _MWD+IFR+MS
204 11690.81 88.77 9.30 32.29 4966.11 7397.94 7397.14 129.74 7398.28 1.00 2.78 BP _MWD+IFR+MS
205 11722.10 89.01 9.32 31.29 4966.72 7428.94 7428.01 134.80 7429.24 1.04 0.77 BP _MWD+IFR+MS
206 11754.19 89.29 9.52 32.09 4967.19 7460.73. 7459.67 140.05 7460.98 1.08 1.07 BP _MWD+IFR+MS
207 11787.29 89.53 9.06 33.10 4967.53 7493.52 7492.33 145.39 7493.74 1.11 1.57 BP _MWD+IFR+MS
208 11818.83 89.90 9.45 31.54 4967.69 7524.78 7523.46 150.46 7524.96 1.15 1.70 BP _MWD+IFR+MS
209 11850.94 90.14 7.92 32.11 4967.68 7556.64 7555.20 155.31 7556.80 1.18 4.82 BP _MWD+IFR+MS
210 11882.84 89.18 8.37 31.90 4967.87 7588.33 7586.78 159.83 7588.46 1.21 3.32 BP _MWD+IFR+MS
•
SCHLUMBERGER Survey Report 21-Feb-2007 14:02:39 Page 9 of 9
___
Seq ________
Measured
Incl
Azimuth ------
Course --------
TVD --------
Vertical - P
Dis 1
Dis 1
P
Total
At
DLS Vy
Sr Tool
## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
211 11913 99 87.66 6 75 31 15 4968.73 7619.29 7617.64 163.93 7619.41 1.23 7.13 BP_ MWD+IFR+MS
212 11946.65 88.33 7.55 32.66 4969.87 7651.77 7650.03 167.99 7651.87 1.26 3.19 BP_ MWD+IFR+MS
213 11978.50 88.70 7.84 31.85 4970.70 7683.43 7681.58 172.25 7683.51 1.28 1.48 BP_ MWD+IFR+MS
214 12010.01 88.94 7.31 31.51 4971.35 7714.76 7712.81 176.41 7714.83 1.31 1.85 BP_ MWD+IFR+MS
215 12042.37 88.22 6.79 32.36 4972.15 7746.96 7744.92 180.38 7747.02 1.33 2.74 BP_ MWD+IFR+MS
216 12074.39 88.67 6.64 32.02 4973.02 7778.84 7776.70 184.12 7778.88 1.36 1.48 BP_ MWD+IFR+MS •
217 12105.24 89.05 6.47 30.85 4973.63 7809.56 7807.35 187.64 7809.60 1.38 1.35 BP_ MWD+IFR+MS
218 12137.89 89.49 5.73 32.65 4974.05 7842.11 7839.81 191.11 7842.14 1.40 2.64 BP_ MWD+IFR+MS
219 12169.28 89.66 5.44 31.39 4974.28 7873.42 7871.05 194.16 7873.44 1.41 1.07 BP_ MWD+IFR+MS
220 12201.59 88.18 6.35 32.31 4974.89 7905.63 7903.18 197.48 7905.65 1.43 5.38 BP_ MWD+IFR+MS
221 12233.56 88.60 7.25 31.97 4975.79 7937.45 7934.91 201.27 7937.46 1.45 3.11 BP_ MWD+IFR+MS
222 12265.52 89.12 5.93 31.96 4976.42 7969.28 7966.65 204.93 7969.29 1.47 4.44 BP_ MWD+IFR+MS
223 12296.70 89.18 6.52 31.18 4976.88 8000.35 7997.65 208.31 8000.36 1.49 1.90 BP_ MWD+IFR+MS
224 12328.85 87.92 7.32 32.15 4977.70 8032.35 8029.55 212.19 8032.35 1.51 4.64 BP_ MWD+IFR+MS
225 12360.79 87.92 7.42 31.94 4978.86 8064.11 8061.21 216.28 8064.11 1.54 0.31 BP_ MWD+IFR+MS
226 12391.75 88.19 6.40 30.96 4979.91 8094.91 8091.92 220.00 8094.91 1.56 3.41 BP_ MWD+IFR+MS
227 12424.26 89.49 7.35 32.51 4980.57 8127.28 8124.19 223.89 8127.28 1.58 4.95 BP_ MWD+IFR+MS
228 12455.45 91.59 8.86 31.19 4980.27 8158.26. 8155.07 228.29 8158.26 1.60 8.29 BP_ MWD+IFR+MS
229 12487.62 91.69 9.07 32.17 4979.35 8190.15 8186.83 233.30 8190.15 1.63 0.72 BP_ MWD+IFR+MS
230 12519.50 91.93 8.74 31.88 4978.34 8221.75 8218.31 238.23 8221.76 1.66 1.28 BP_ MWD+IFR+MS
231 12551.27 92.34 8.79 31.77 4977.16 8253.24 8249.69 243.07 8253.27 1.69 1.30 BP_ MWD+IFR+MS •
232 12583.16 92.61 8.64 31.89 4975.78 8284.86 8281.18 247.90 8284.89 1.71 0.97 BP_ MWD+IFR+MS
233 12615.32 92.58 7.68 32.16 4974.33 8316.77 8312.98 252.46 8316.82 1.74 2.98 BP_ MWD+IFR+MS
234 12646.93 92.20 7.98 31.61 4973.01 8348.16 8344.27 256.76 8348.22 1.76 1.53 BP_ MWD+IFR+MS
235 12679.32 92.00 8.73 32.39 4971.82 8380.30 8376.29 261.47 8380.38 1.79 2.39 BP_ MWD+IFR+MS
236 12711.00 91.96 9.11 31.68 4970.73 8411.70. 8407.57 266.37 8411.79 1.81 1.21 BP_ MWD+IFR+MS
237 12743.36 92.55 9.08 32.36 4969.45 8443.76 8439.50 271.49 8443.87 1.84 1.83 BP_ MWD+IFR+MS
238 12804.00 92.55 9.08 60.64 4966.76 8503.81 8499.32 281.05 8503.97 1.89 0.00 Proj. to TD
[(c)2007 IDEAL ID12 OC O1]
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC)
Well No W-204L2 Date Dispatched: 2-Mar-07
Installation/Rig Nabors-7ES Dispatched By: Nate Rose
LWD Log Delivery V1.1,10-02-03
Data No Of Prints No of Floppies
Surveys 2 1
Please sign and return to: James H. Johnson
ReCelved By: BP Exploration (Alaska) Inc.
Petrotechnical Data Center (LR2-1)
/fin _ ~ ~ 900 E. Benson Blvd.
Al
k
99508
~' (,~ A
h
a
nc
orage,
as
Fax:907-564-4005
e-mail address: johnsojhC~?hp.com
o~.d~."~~C~
Robert Tirpack
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519
•
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7~" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Prudhoe Bay Field, Polaris Oil Pool, W-204L2
BP Exploration (Alaska) Inc.
Permit No: 206-160
Surface Location: 4859' FSL, 1177' FEL, SEC. 21, T11N, R12E, UM
Bottomhole Location: 2601' FSL, 943' FEL, SEC. 09, T 11 N, R 12E, UM
Dear Mr. Tirpack:
Enclosed is the approved application for permit to drill the above referenced
development well.
The permit is for a new wellbore segment of existing well PBU W-204, Permit No.
206-158, API No. 50-029-23333-00. Production should continue to be reported as
a function of the original API number stated above.
This permit to drill does not exempt you from obtaining additional permits or an
approval required by law from other governmental agencies and does not authorize
conducting drilling operations until all other required permits and approvals have
been issued. In addition, the Commission reserves the right to withdraw the
permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter
25 of the Alaska Administrative Code unless the Commission specifically
authorizes a variance. Failure to comply with an applicable provision of AS 31.05,
Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or
the terms and conditions of this permit may result in the revocation or suspension
of the permit. When providing notice for a representative of the Commission to
witness any required test, contact the Commission's petroleum field inspector at
(907) 659-3607 (pager).
DATED this day of November, 2006
cc: Department of Fish 8z; Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~_, ~-~ o~
p V STATE OF ALASKA ~ ~ "° _
' ~ r~Jd ~ ALASP~IL AND GAS CONSERVATION COMMI~N
V~ PERMIT TO DRILL
20 AAC 25.005 .
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is prop~p8ed!for:
^Coalbed Methane ^ Gas Hydrates
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
W-204L2
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 12649 TVD 5072 12. Field /Pool(s):
Prudhoe Bay Field /Polaris Pool
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Property Designation:
ADL 028261
FEL, SEC. 21, T11N, R12E, UM
FSL, 1177
4859
Top of Productive Horizon:
R12E
UM (OBa)
900' FEL
SEC. 16
T11N
1199' FSL
8. Land Use Permit:
13. Approximate Spud Date:
December 8, 2006
,
,
,
,
,
Total Depth:
2601' FSL, 943' FEL, SEC. 09, T11 N, R12E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
16,020'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-612049 y-5959836 Zone-ASP4 10. KB Elevation Plan
(Height above GL): 81.5 feet 15. Distance to Nearest Well Within Pool:
258'
16. Deviated Wells: Kickoff Depth: 5351 feet
Maximum Hole An le: 104 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2250 Surface: 1750
1 Casin Prq r m: S cfi .ti n To - e in De th - Bo m u ti of ment c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
6-3/4" 4-1/2" 12.6# L-80 IBT 7323' 5326' 4976' 12649' 5072' Uncemented Slotted Liner
1 g. PRESE NT WELL CONDITION SUMMARY (Z'o be completed for Redrill and Re-entry Operations)
Total Depth MD (ft):
12662 Total Depth TVD (ft):
5207 Plugs (measured):
None Effective Depth MD (ft):
12662 Effective Depth TVD (ft):
5207 Junk (measured):
None
asing Length: ize ement Volume MD
Conductor /Structural 110' 20" x 34" 260 sx Ar i et A r x. 110' 110'
Surface 3346' 10-3/4" 599 sx AS Lite 441 sx Class 'G' 346' 3327'
Intermediate 5861' 7-5/8" 431 sx Class'G' 5861' 5132'
Produ ion
Liner 6801' 4-1/2" Uncemented Slotted Liner OBd 5861' - 12662' 5131' - 5206'
Liner 7136' 4-1/2" Uncemented Slotted Liner OBc 5516' - 5051' 12652' - 5152'
Perforation Depth MD (ft): Slotted Liner Perforation Depth TVD (ft): Slotted Liner
20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Ken Allen, 564-4366
Printed Name Robert Tirpack Title Senior Drilling Engineer
/~~~ Prepared By NamelNumber:
Si nature /l~tx'n...~r-~~"F~~~ Phone 564-4166 Date // /~~-t~ Terrie Hubble, 564-4628
Commission Use Onl
Permit To Drill
Number: ~~" API Number:
50-~Z -2 ~ ~/ Permit Approval
Date: ~' ~ ~ See cover letter for
oth r re uirements
Conditions of Approval: '~,(
If box is checked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained shales: ~l
Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes/~_No
~'eS~ ~~ ~t ~ ~S~ ~ ~ ~~ ~ HZS Measures:~Yes ^ No ' e Tonal Survey Req'd~Yes ^ No
Other:
APPROVED BY THE COMMISSION
Date i~j ~~ ,COMMISSIONER
Form 10-401 RevlSed 12/2005 j i ~ ~ ~ ' `/ ouunm ni vuNu~.aic
1
~ . d ,
• •
~ Well Name: ~ W-204, W-204L1 & W-204L2 ~
Drill and Complete Plan Summary
Type of Well (producer or injector): Schrader Bluff OBa, OBc, and OBd Multi-Lat producer
Surface Location: X = 612,049 Y = 5,959,836
As Built Sec 21, T 11 N, R 12E, FEL: 1176.6', FNL: 420.9'
W-204 OBd Target Start: X = 612,300 Y = 5,961,380 Z = 5050' TVDSS
Sec 16, T 11 N, R12E, FEL: 899.1', FSL: 1119.2'
W-204 OBd Target End: X = 612,150 Y = 5,968,140 Z = 5125' TVDSS
Sec 9, T 11 N, R12E, FEL: 932.9', FSL: 2601.2'
W-204L1 OBc Target Start: X = 612,280 Y = 5,961,580 Z = 4995' TVDSS
Sec 16, T 11 N, R12E, FEL: 915.7', FSL: 1319.5'
W-204L1 OBc Target End: X = 612,140 Y = 5,968,140 Z = 5070' TVDSS
Sec 9, T 11 N, R12E, FEL: 943', FSL: 2601.3'
W-204L2 OBa Target Start: X = 612,298 Y = 5,961,460 Z = 491'5 TVDSS
Sec 16, T 11 N, R12E, FEL: 899.7', FSL: 1199.2'
W-204L7 OBa Target End: X = 612,140 Y = 5,968,140 Z = 4990' TVDSS
Sec 9, T 11 N, R12E, FEL: 943', FSL: 2601.3'
AFE Number: PLD5M1082 Ri Nabors 7ES GL: 53' RT: 28.5' RTE: 81.5'
Estimated Start Date: December 08, 2006
Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Well Type:
Current Status:
Conductor:
BHT:
BHP:
O eratin da s to com lete: 48
16,020' to PBU boundary
258' from W-23 at 4,859' in W-204 wp09
Schrader O-sand Tri-lateral Producer
New well
20" X 34", 215.5 ppf, set at 110' KB
105 °F
8.2 - 8.7 EMW ppg in Schrader O-sands
W-204, Li & L2 Permit to Drill 11/07/06
• •
Formation Markers:
7 Formation To s TVDss and Estimated Pore Pressures
Est. Commercial Est.
Formation Hydrocarbon Pore Est. Pore
To s Uncertain Bearin Press. Press.
(PP9
Formation TVDss feet Yes/No Psi EMW
NOTE: All formation tops are required from 1000' above
proposed KOP to TD for sidetracks
NOTE: All formation tops are required from surface to TD for all
new wells
G1 -295 +/-50' No 134 8.8
SV6 -1200 +/-50' No 546 8.8
SV5 -1840 +/-50' No 837 8.8
Base
Permafrost -1845 +/-50' No 839 8.8
SV4 -1995 +/-50' Gas H drates 908 8.8
Fault #1 -2355 +/- 150' MD -See Fault Section
SV3 -2510 +/-50' Gas H rates 1142 8.8
Poss. Free as
or Gas
SV2 -2700 +/-50' H drates 1229 8.8
Poss. Free Gas
or Gas
SV1 -2990 +/-50' H drates 1360 8.8
UG4 -3325 +/-50' Thin coal 1513 8.8
Heavy Oil
between-3365
UG4A -3365 +/-50' and -3525' SS 1531 8.8
Thin coals;
Poss. Heavy oil
between 3900'-
UG3 -3705 +/-50' 3s5o' SS 1686 8.8
UG1 -4155 +/-50' No, water 1891 8.8
Heavy Oil
UG_Ma -4465 +/-50' and -449 SS 2050 8.8
Heavy Oil
UG_Mb1 -4510 +/-50' and -a54o ss 2070 8.8
Heavy Oil
UG_Mb2 -4555 +/-50' and -4580' SS 2090 8.8
UG_Mc -4620 +/-50' No, water 2120 8.8
SB_Na -4685 +/-25' No, water 2150 8.8
SB_Nb -4710 +/-25' No, water 2160 8.8
SB_Nc -4740 +/-25' No, water 2170 8.8
SB_Ne -4750 +/-25' No, water 2180 8.8
SB_OA -4845 +/-25' No, water 2200 8.7
2120 -
SB_OBa -4890 +/-25' Yes 2200 8.3-8.7
2180-
SB_OBb -4920 +/-25' Yes 2220 8.5-8.7
2200-
SB_OBc -4965 +1-25' Yes 2240 8.5-8.7
2140-
SB_OBd -5025 +/-25' Yes 2250 8.2-8.6
SB_OBe Not Reached +/-25' Yes 2290 8.7
Permit to Drill W-204 Multilateral Version 1.0
• •
Formation pressures from surface to the Ma are calculated based on a .455 water gradient. Formation
pressures from the UG_Ma down to the SB_OA are based on W-200PB1 RFT pressures taken before start
of W Pad Schrader Bluff production. Formation pressures in the SB_OBa through SB_OBd sands are
estimated and assume these sands will show moderate pressure depletion resulting from W-200 and W-201
Wellbore TD Criteria:
TD for all laterals is planned to be at end of polygon. No rathole is necessary.
No extensions beyond the end of the polygons are planned, however if extended poor rock quality is encountered
while drilling, some laterals could be ended sooner.
If structure along the laterals comes in substantially deep to prognosis, then the OBa lateral may be ended sooner
than the polygon end to avoid approaching any closer than 1500 feet to the minimum case OWC location. If O
sand structure comes in shallow to prognosis, the OBa lateral should be terminated at the point where the top OBa
marker depth is projected to reach a depth of -4970 feet TVDSS. Terminating the OBa lateral at this depth will still
leave a minimum of 1500 feet of lateral standoff to the minimum case OWC depth at -5030 feet TVDSS. O sand
structural depths along the W-204 laterals should be well established by the time the OBd lateral is drilled. Thus,
there should be between 5 and 10 days of time prior to drilling the OBa lateral to reconfigure the OBa lateral
profile, if necessary.
Mud Program:
13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud
Interval Densi Funnel vis YP PH FL
Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0
Base Perm 9 - .5 200-250 30-45 8.5-9.0 8.0
Interval TD .6 ax 200-250 30-40 8.5-9.0 5.0-7.0
t ~
9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND)
Interval Densit YP PV API Filtrate MBT H Chlorides
Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600
6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro)
Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT
All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6
Survey and Logging Program:
13-1/2" Hole Section: Surface Gyro will be needed. Once clear of Magnetic interference MWD Surveys will
be IIFR corrected real time with multi-station anal sis a lied.
O en Hole: MWD / GR
Cased hole: None
9-7/8" Intermediate Hole: MWD Surveys will be IIFR corrected real time with multi-station analysis applied.
Open hole: MWD: Dir/ GR / Res / Azimuthal Den / Neu /PWD
DPC: 5 MDT oil Sam les & 30 MDT Pressures
Cased Hole: USIT/CBL
6-3/4" Produciton Holes: MWD Surveys will be IIFR corrected real time with multi-station anal sis ap lied.
O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM /PWD
Cased Hole: N/A
3 ~ Permit to Drill W-204 Multilateral Version 1.0
;7
CasinalTubina Program
•
Hole Size Csg /
Tb O.D. WdFt Grade Conn Burst
si Collapse
si Length Top
MD /TVD Bottom
MD /TVD
48" 20" X 34" 215.5# A53 Weld GL 110'/110'
13-'/z" 10-3/a" 45.5# L-80 BTC 5,210 2,480 3346' GL 3346' / 3327'
9-'/e° 7-a/" 29.7# L-80 BTC-M /
TC-I I 6,890 4,790 5861' GL 5861' / 5132'
6-3/a" OBd 4-'/z"
slotted 12.6# L-80 IBT N/A N/A 6801' 5861' / 5131' 12662' / 5206'
6-3/a" OBc 4-'/z"
slotted 12.6# L-80 IBT N/A N/A 7136' 5516' / 5051' 12652' / 5151
6-3/a" OBa 4-'/z"
slotted 12.6# L-80 IBT N/A N/A 7323' 5326' / 4976' 12649' / 5071'
Tubin 4-'/z" 12.6# 13Cr-80 Vam To 8,430 7,500 5300' GL 5300' / 4964'
Surface and Anti-Collision Issues
Surface Shut-in Wells:
W-201 will require surface shut-in and well house removal in order to move over well W-204. No other wells
should require well house removal and surface shut-in.
Close Approach Shut-in Wells: All wells pass BP's major risk Anti-collision criteria scan. There are no wells that
will require subsurface isolation for this profile.
Cement Calculations
Casing Size: 10-3/a -in 45.5-Ib/ft L-80 BTC surface casing
Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost
Lead TOC: Surface
Tail: 1,000' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 2,346' MD 1,000' MD above shoe
Total Cement Volume: Spacer 75 bbls of Viscosified Spacer weighted to 10.00 ppg (Mud Push)
Lead 473 bbls, 2658 ft , 599 sks 10.7 Ib/ al ASL G + additives - 4.44 ft /sk
Tail 92 bbls, 516 ft , 441 sks 15.8 Ib/ al Class G + additives -1.17 ft /sk
Tema BHST ~66° F. BHCT ~60° F estimated by BP RP.
In the event that cement is not circulated to surface during the initial surface casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to surface.
Casing Size: 17-5/8", 29.7
casing
L-80 BTC-M / TC-II intermediate
Lead TOC: N/A
Tail: 2257' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 4146' MD 507' MD above the Ma, 800' MD below Surface Shoe
Total Cement Volume: Wash 20 bbls CW100
S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.7
Tail 89 bbls, 500 ft , 431 sks 15.81b/ al G + Gasblok -1.16 ft /sk
Temq BHST - 102° F. from SOR. BHCT ~85° F estimated by BP RP.
Centralizer Recommendations
10-3/a" Casing Centralizer Placement
a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the
casing shoe up to 1,000' MD above the shoe.
7-°/." Casing Space Out
a) Spaceout the 7-°/e" casing to place a full joint in the window area of the OBb, OBa and OA sands.
b) Place 1 RA tag above each window exit. RA tags to be spaced out ~40 - 80' above window
4 Permit to Drill W-204 Multilateral Version 1.0
depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125'
above the casing shoe.
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular
preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon
calculations below, BOP equipment will be tested to 3,500 psi.
BOP regular test frequency will be 14 days, with a function test every 7 days.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Surface Hole
A diverter will be nippled up and function tested prior to drilling surface hole.
Intermediate. Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 10-3/4" Casing Test:
• In#egrity Test - 9-7/8" hole:
• Kick Tolerance:
Production Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 7-5/8" Casing Test:
• Integrity Test - 6-3/4" hole:
• Kick Tolerance:
• Planned completion fluid:
2,250 psi -Schrader OBd (8.6 ppg C~ 5,025' TVDss)
1,750 psi -Based on a full column of gas @ 0.10 psi/ft
3,500 psi/250 psi Rams
2,500 psi/250 psi Annular
3,500 psi (45.5# L-80 casing burst is 5,210 psi)
LOT
53 bbls with a 10.8 ppg EMW LOT, 9.2ppg mud and 8.7 ppg OBd EMW
2,250 psi -Schrader OBd (8.6 ppg @ 5,025' TVDss)
1,750 psi -Based on a full column of gas Cd1 0.10 psi/ft
3,500 psi/250 psi Rams
2,500 psi/250 psi Annular
3,500 psi
FIT to 10.2 ppg EMW for OBd lateral only
Infinite at OBd, OBc, OBa, and OA with an 10.2 ppg EMW FIT
9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore
Disposal
• No annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at OS-
04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class I waste to Pad 3 for disposal.
5 Permit to Drill W-204 Multilateral Version 1.0
•
•
Drilling Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
Well Control
A. The Schrader in the target fault block is expected to be normal pressured at 8.2-8.7 ppg EMW. This
pressure is estimated based on offset well pressures and material balance.
Hydrates and Shallow gas
A. Gas Hydrates are possible at W-pad from the SV5 thru the SV1 sands below the base of the permafrost.
Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole
although there are previous instances of gas from the SV1 into the Ugnu on W-pad. Recommended
practices and precautions for drilling hydrates should be followed in the surface and intermediate hole
sections.
Itl. Fault Crossing/Lost Circulation/Breathing
A. Lost circulation is not expected on this well.
B. Fault #1, if detected, should be crossed in the SV3 formation, but should have a minimal throw at that
depth.
C. If the seismic artifact around the possible fault #2 locations does indeed turn out to be a fault then the well
bore will be sidetracked to a new BHL to the East. This new location will likely be over 500' away from our
current target and will require state approval before proceeding.
D. Breathing is not expected on this well.
E. 53 bbls with a 10.8 ppg EMW LOT, 9.2ppg mud and 8.7 ppg OBd EMW
F. Wood and associated running gravels have been caused problems on previous W-pad well surface holes.
IV. Kick Tolerance/Integrity Testing
Kick Tolerance / Inte rit Testin Summa Table
Casing set / Maximum Influx Volume Mud Weight Exp Pore Press Min LOT /FIT
Interval
Surface / 9 7/8" 53 9.2 8.7 OBd 10.8 LOT
Intermediate / 6-3/4" Infinite 9.2 8.7 (OBd) 10.2 {FIT for OBd
lateral onl
NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole
drilled outside of the previous casing string
An FIT will only be performed for the OBd lateral, not the OBc, or OBa.
6 ~ Permit to Drill W-204 Multilateral Version 1.0
~ •
v. rtvaroaen Suit~ae
#1 Closest SHL Well H2S Level
#2 Closest SHL Well H2S Level
#1 Closest BHL Well H2S Level
#2 Closest BHL Well H2S Level
Max. Recorded H2S on Pad/Facility
Other Relevant H2S Data
(H2S alarms from rigs, etc.)
W-201 20 m 11 /1 /2005
W-200 15 m 8/21/2006
W-23A 15 m 4/14/2006
W-19A 20 m 7/4/2006
W-01 60 p om 8/16/2005
All W Pad gas lift wells are expected to have H2S levels
in the 5 to 60 ppm range as a result of using PBU gas lift
gas.
W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times.
VI. Faults
A. Two faults could be crossed while drilling W-204. No losses are expected to be associated with these
faults.
B. Fault #1 -Fault is dying in throw upward. At intersection point with W-204, fault should have minimal
throw.
C. Fault #2 is a possible fault - if encountered, wellbore will be re-oriented to a more easterly postion.
D. Fault #3 will not be crossed by W-204. Fault position and standoff defines western side of target polygon.
Fault Location MD TVDss Throw Direction Uncertainty
Fault #1 - SVe 2,435' -2,355 0 to -25' West +/- 150' MD
Fault #2 -Possible
fault - OBd Interval 6,645' -5,057' 0 to -40' East +/- 150' MD
CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
7 Permit to Drill W-204 Multilateral Version 1.0
~ r
W-204. W-204 Li & W-204 L2
OPERATIONS SUMMARY
Pre-Riq Work:
1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC
Gen 5 Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and
production simops.
Drilling Riq Operations:
1. MIRU Nabors 7ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in
derrick.
2. MU 13-'/z"drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,346' MD. The
actual surface hole TD will be +/-200' TVD below the top of the SV1 sand.
3. Run and cement the 10-3/a", 45.5#, L-80 BTC-SD casing from TD back to surface. ND drilling spool and riser
and NU casing /tubing head. NU BOPE and test to 3,500 psi.
4. MU 9'/8" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer 11,600' from the
bit. RIH to float collar. Test the 10-3/a" casing to 3,500 psi. for 30 minutes. Note: Ensure grade is L-80. There
has been some K-55 on the slope and 3,500 psi would be near 100% burst for K-55 casing.
5. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform
a LOT. Directionally drill ahead to TD at t 5,861' MD.
6. Run drill pipe conveyed MDT. Perform cleanout run if necessary.
7. MU and run 7 5/e", 29.7#, L-80, BTC-M, TC-11 casing to TD. Cement in one stage to 4,446' MD (1,000' MD
from the surface casing shoe). Bump plug with seawater.
8. Clean pits for displacement. Freeze protect 7 5/e" x 10-3/a" annulus to 2,200' TVD.
9. RU a-line. Run USIT log from TD to surface.
• W-204 OBd Lateral
10. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the
7-g/e" casing to 3,500 psi for 30 minutes.
11. Displace well over to 9.0 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of
new formation and perform FIT to 10.5 ppg EMW.
12. Directionally drill ahead to TD geo-steering through the OBd to TD at 12,662' MD. Back ream out of the hole
to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM.
13. POOH to near OBc window depth, log the top OBc (RA marker) with GR, log across the OBa window as well.
POOH.
14. MU and run 4-'h" 12.6# L-80 BTC-M slotted liner and swell packers with liner hanger and liner top packer.
Position TOL for OBc whipstock. POOH.
• W-204L1. OBc Lateral
15. PU the 7-5/8" whipstock assembly. Set the whipstock on the OBd liner top packer such that the top of the
window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.0 ppg Versapro MOBM. Mill window. POOH.
16. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of OBb lateral. Back ream out of hole to KOP, circulate and condition mud.
RIH to TD and displace well bore to SF MOBM. POOH.
17. Pull whipstock #1.
18. Run and set 4-'/z" slotted liner and hook hanger. POOH and LD liner running string.
19. Run Baker H anger Lateral Entry Module #1 with ZXP liner top packer, POOH.
• W-204L2 Ba eral
20. PU the 7- " w 'stock assembly. Set the whipstock on the OBc liner top packer such that the top of the
window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.0 ppg Versapro MOBM. Mill window. POOH.
8 Permit to Drill W-204 Multilateral Version 1.0
21. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition
mud. RIH to TD and displace well bore to SF MOBM. POOH.
22. Pull whipstock #2.
23. Run and set 4-'h" slotted liner with swell packers and hook hanger, POOH and LD liner running string.
24. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH.
25. Clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH.
26. MU 4-~/2" 12.6# IBT-M, L-80 completion assembly tying into and RIH. See completion schematic for details.
Land tubing hanger and run in lockdown screws.
27. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus
to 3,500 psi. Shear DCK valve.
28. Install two-way check and test to 1,000 psi from below. Nipple down the ROPE. Nipple up and test the tree to
5,000 psi.
29. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well
to 2,200' TVD. Install VR plug in 7 5/e" casing annulus valves.
30. Install BPV. Secure the well and rig down /move off Nabors 7ES.
Post-Rig Work:
1. MIRU slickline. Pull the ball and rod /RHC plug.
2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE.
9 Permit to Drill W-204 Multilateral Version 1.0
W-204, L1, & L2 PROPOSED COMPLETION
.~
r? TREE: FMC 4-1/16" 5M
. WELLHEAD: FMC Gen 5 System
g , ~
20" X 34" 215.5 Ib/ft, A53 ERW Insulated ~ 109' 11", 5M csg.head w/ 7" mandrel hanger & packoff
• . 11" x 11", 5M, tbg spool w/
•'
~ Halliburton X-Nipple (3.813" ID) @ 2200' TVD
11" x 4-1/2" tubing hanger with control line ports
~ ~
" 11" X 4-1/16" Adaptor Flange
,~ , 12.6 Ib/ft, 13CR-80,
4-1/2
" Orig KB elev (N-7ES) _'
VamTop Coupling OD: 4.937
~ :~ DrifUID : 3.833_/3.958_
' 10-314", 45.5# L-80 BTC Csg Q 3,346' MD
4.5" Baker sliding sleeve with 3.813" ID
GLM Design:
7-518" X 5-1/2" Baker PRM Packer @ #4 - 2500' TVD - 4-1/2" X 1" KBG-2 - SV
Halliburton X-Nipples (3.813" ID) #3 - 3500' TVD - 4-112" X 1" KBG-2 - DV
#2 - 5 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV
4.5" WLEG Q 5,800' MD #1 - 2 jts above sliding sleeve - 4-1 /2" X 1"KBG-2 - DV
Phoenix
Pressure '~'..
Gauge ~ Versapro SFMOBM in each Lateral and in mother bore from tbg tail down.
with control
lines to surface
Est TOC 4,146'
RA Tag TBD -5/8" , 29.7#, L-80, TCII to -4,946'
"
~~ Casing Drift: 6.75
' Casing ID: 6.875"
,v~'r~ ~.
,
('
/
'
`
o
Junction Specifications: '.~ ' " 6-314' OBa Lateral 5,326 12 650
Junction ID through LEM ~
~ `
Module withoutdiverter: 3.68"
LEM run with internal sealbores RA Tag TBD '
"~ ~-~~~~-~_ ----= °-_~ _--~_
~ '
~
to allow the use of isolation ~ 6t'="""'"' ~"` "~ ' ~°"
sleeve across window. Swell packer placeme nt TBD
RA TagTBD~ ~
Baker Hughes Hookwall Hanger "
Wndow in 7-5/8" casing \\\
Well Inclination @ Window = -65 '
Baker Hughes Hookwall Hanger
Window in 7-5/8" casing
Well Inclination @ Window = -72
29.7#, L-80, BTC-M @ 5861'.
Casing Drift: 6.75"
Casing ID: 6.875"
6-314" OBc Lateral 5,516'-12,652'
~~ Swell packer placement TBD
,~~!! _ ,-~
' 6-3/4" Oed Lateral 5,861'- 12,662'
DATE REV. BY COMMENTS A
1 010 4/2 0 06 KWA Level 3Multi-Lateral 4-tYt° GL Com lesion a 3/Q
D~r../Ln
(7
'J
~
P
~
4![ (t
/T
f
(~
J
/
M,
,
j
P
I
N
O
-02
9-
A
O
: S
ORION 50-029-
50-029-
WELL: W-204 ML
50-029-
by
W-204L2 (P41 Proposal Schlumberger
Report Date: September 13, 2006 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 1.520°
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure 1 Slot: W-PAD / W-204 g
it u TVD Reference Datum: Rotary Table
Well: y
Plan W-204
~ibi l TVD Reference Elevation: 81.50 ft relative to MSL
Borehole: a
Plan W-204L2 ~~ Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL
UWIIAPI#: 50029 Magnetic Declination: 23.932°
Survey Name 1 Date: W-204L2 (P4) /September 13, 2006 Total Field Strength: 57635.331 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 152.789° / 8429.13 ft / 6.507 / 1.662 Magnetic Dip: 80.884°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 07, 2006
Location Latllong: N 70.29921630, W 149.09253597 Magnetic Declination Model: BGGM 2006
Location Grid NIE YIX: N 5959836.000 ftUS, E 612049.000 ftUS North Reference: True North
Grid Convergence Angle: X0.85435460° Total Corr Mag North a True North: +23.932°
Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head
J
Comments Measured Inclination Azimuth SulrSea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Tool Face
-- ft
_-- -- de
-- -' d
--- _ . ft
.___ ,... ft
.,.-,,. _.. ft
.,..,... ft
.,...,. ,.,. ft
.,..,. ,... de
, ,r. de 1100 ft
. ,.., de 100 ft
., ~, de 100 ft
., nn ftUS
cncno~n ~n ftUS
cXnonn co
r.~ Tn ~ronacnc
err ~ r.n n~nn~~ .Q
TOpWhIpStOCk b3Z6.4U 6Z.`Jt7 3D25.S4 425`JS.UV 4`J/OAV -IV4U.l4 IU3LAU 3U~.VJ nJ '*.VV o.a~ -v.aa wvvo~c.~v vic.nc.w ,.~v.www~ra r. ,~~.vwv.•a,v
Base Whipstock 5338.40 64.88 358.34 4900.27 4981. 77 1050.90 1043.07 308.72 --- 16.00 16.00 0.00 5960883.47 612342.11 N 70.30206589 W 149.09003571
KOP Crv 10/100 5351.40 64.88 358.34 4905.79 4987. 29 1062.65 1054.84 308.38 3.14E 0.00 0.00 0.00 5960895.23 612341.59 N 70.30209803 W 149.09003847
5400.00 69.73 358.06 4924.54 5006. 04 1107.40 1099.64 306.97 3.03E 10.00 9.99 -0.58 5960940.00 612339.51 N 70.30222042 W 149.09004989
5500.00 79.72 357.52 4950.84 5032. 34 1203.54 1195.91 303.24 2.89E 10.00 9.99 -0.53 5961036.20 612334.35 N 70.30248343 W 149.09008005
5600.00 89.71 357.02 4960.04 5041. 54 1302.71 1295.25 298.50 2.84E 10.00 9.99 -0.50 5961135.44 612328.13 N 70.30275481 W 149.09011840
5700.00 99.70 356.52 4951.85 5033. 35 1401.91 1394.63 292.89 2.88E 10.00 9.99 -0.50 5961234.72 612321.04 N 70.30302630 W 149.09016375
End Crv 5746.34 104.32 356.28 4942.21 5023. 71 1447.04 1439.86 290.05 --- 10.00 9.99 -0.52 5961279.89 612317.52 N 70.30314986 W 149.09018678
Crv 10/100 5781.89 104.32 356.28 4933.42 5014. 92 1481.34 1474.22 2$7.82 165.05E 0.00 0.00 0.00 5961314.22 612314.78 N 70.30324375 W 149.09020486
5800.00 102.57 355.80 4929.21 5010. 71 1498.87 1491.80 286.60 165.16E 10.00 -9.66 -2.64 5961331.77 612313.30 N 70.30329176 W 149.09021471
5900.00 92.90 353.25 4915.76 4997. 26 1597.10 1590.30 277.13 165.50E 10.00 -9.68 -2.55 5961430.12 612302.37 N 70.30356088 W 149.09 136
W-204L2 OBa Tgt 1 5929.94 90.00 352.50 4915.00 4996. 50 1626.68 1620.00 273.42 163.39E 10.00 -9.68 -2.50 5961459.75 612298.21 N 70.30364200 W 149.0 1
End Crv 5948.45 88.23 351.97 4915.29 4996. 79 1644.95 1638.34 270.92 --- 10.00 -9.58 -2.86 5961478.05 612295.44 N 70.30369211 W 149.09 6
Crv 6/100 7054.76 88.23 351.97 4949.54 5031. 04 2735.40 2733.27 116.46 8.67E 0.00 0.00 0.00 5962570.47 612124.69 N 70.30668339 W 149.09159254
W-204L2 OBa Tgt 2 7084.67 90.00 351.70 4950.00 5031 .50 2764.88 2762.88 112.22 90.OOR 6.00 5.93 -0.90 5962600.00 612120.00 N 70.30676426 W 149.09162694
End Crv 7085.72 90.00 351.76 4950.00 5031 .50 2765.92 2763.92 112.06 --- 6.00 0.00 6.00 5962601.04 612119.83 N 70.30676711 W 149.09162817
Crv 6/100 7587.12 90.00 351.76 4950.00 5031 .50 3260.07 3260.15 40.23 90.OOR 0.00 0.00 0.00 5963096.10 612040.62 N 70.30812278 W 149.09221005
W-204L2 OBa Tgt 3 7591.07 90.00 352.00 4950.00 5031 .50 3263.96 3264.06 39.67 77.38R 6.00 0.00 6.00 5963100.00 612040.00 N 70.30813345 W 149.09221456
7600.00 90.12 352.52 4949.99 5031 .49 3272.77 3272.91 38.47 77.38R 6.00 1.31 5.85 5963108.83 612038.67 N 70.30815762 W 149.09222430
End Crv 7693.16 91.34 357.98 4948.81 5030 .31 3365.33 3365.70 30.76 --- 6.00 1.31 5.86 5963201.49 612029.57 N 70.30841113 W 149.09228676
Crv 6/100 8059.55 91.34 357.98 4940.27 5021 .77 3730.93 3731.77 17.84 168.23E 0.00 0.00 0.00 5963567.29 612011.20 N 70.30941119 W 149.09239144
W-204L2 OBa Tgt 4 8082.30 90.00 357.70 4940.00 5021 .50 3753.62 3754.49 16.98 169.31 L 6.00 -5.87 -1.22 5963590.00 612010.00 N 70.30947329 W 149.09239838
8100.00 88.96 357.50 4940.16 5021 .66 3771.28 3772.18 16.24 169.31 L 6.00 -5.90 -1.11 5963607.67 612009.00 N 70.30952160 W 149.09240439
WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-204\Plan W-204\Plan W-204L2\W-204L2 (P4) Generated 9/13/2006 11:04 AM Page 1 of 2
Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude LongiWde
Depth SeMion Tool Face
ft de de ft ft k ft ft de de 1100 ft de 100 ft de 100 ft ftUS ftUS
tna ~rv
Crv 6/100
W-204L2 OBa Tgt 5
End Crv
Crv 6/100
W-204L2 OBa Tgt 6
End Crv
Crv 6/100
W-204L2 OBa Tgt 7
End Crv
Crv 6/100
W-204L2 OBa Tgt 8
End Crv
Crv 6/100
W-204L2 OBa Tgt 9
End Crv
Crv 6/100
W-204L2 OBa Tgt 10
End Crv
TD / 4-1/2" Lnr
8 1 V 1. / 1 68.80
8588.38 88.86
8593.32 89.15
8598.00 89.43
9585.56 89.43
9595.26 89.42
9600.00 89.41
9602.88 89.40
10052.20 89.40
10095.74 90.00
10100.00 90.07
10139.23 90.68
10534.90 90.68
10546.27 90.00
10591.02 87.32
10862.73 87.32
10900.00 89.16
10917.18 90.00
10926.49 90.44
11566.83 90.44
11579.98 90.00
11600.00 89.35
11613.70 .88.91
12649.48 / 88.91
JV/.40 4~4V. 1~ VVL I. V.7 J//G . y.7 J//J.O~ IV.II --- V.VV - -~•~ ~ ov.~vva. .'v
357.48 4949. 91 5031. 41 4258 .36 4260. 00 -5.20 6.58E 0.00 0.00 0.00 5964095. 07
357.45 4950. 00 5031. 50 4263 .28 4264. 93 -5.41 6.58E 6.00 5.96 -0.69 5964100. 00
357.42 4950. 06 5031. 56 4267 .95 4269. 60 -5.62 --- 6.00 5.96 -0.69 5964104. 67
357.42 4959. 90 5041. 40 5252 .93 5256. 11 -50.11 90.87R 0.00 0.00 0.00 5965090. 31
358.00 4960. 00 5041. 50 5262 .61 5265. 80 -50.50 92.33R 6.00 -0.09 6.00 5965100. 00
358.28 4960. 05 5041. 55 5267 .34 5270. 54 -50.65 92.33R 6.00 -0.24 6.00 5965104. 73
358.46 4960. 08 5041. 58 5270 .21 5273. 41 -50.74 --- 6.00 -0.24 6.00 5965107. 61
358.46 4964. 77 5046. 27 5718 .86 5722. 54 -62.84 76.77R 0.00 0.00 0.00 5965556. 47
1.00 4965. 00 5046. 50 5762 .39 5766. 09 -63.04 74.95R 6.00 1.37 5.84 5965600. 00
1.25 4965. 00 5046. 50 5766 .64 5770. 34 -62.96 74.95R 6.00 1.56 5.79 5965604. 26
3.52 4964. 74 5046. 24 5805 .86 5809. 53 -61.33 --- 6.00 1.56 5.79 5965643. 46
3.52 4960. 07 5041. 57 6201 .27 6204. 44 -37.04 173.24R 0.00 0.00 0.00 5966038 .65
3.60 4960. 00 5041. 50 6212 .63 6215. 78 -36.33 175.22R 6.00 -5.96 0.71 5966050 .00
3.82 4961. 04 5042. 54 6257 .33 6260. 42 -33.44 --- 6.00 -5.98 0.50 5966094 .67
3.82 4973. 73 5055. 23 6528 .52 6531. 23 -15.34 35.05R 0.00 0.00 0.00 5966365 .70
5.11 4974. 87 5056. 37 6565 .72 6568. 37 -12.43 35.01 R 6.00 4.91 3.45 5966402 .87
5.70 4975. 00 5056. 50 6582 .87 6585. 47 -10.82 38.10R 6.00 4.91 3.44 5966420 .00
6.04 4974. 96 5056. 46 6592 .15 6594. 73 -9.86 --- 6.00 4.72 3.70 5966429 .27
6.04 4970. 05 5051. 55 7230 .47 7231. 49 57.56 123.86R 0.00 0.00 0.00 5967066 .91
6.70 4970. 00 5051. 50 7243 .58 7244. 56 59.02 122.57R 6.00 -3.34 4.98 5967080 .00
7.71 4970. 11 5051 .61 7263 .50 7264. 42 61.54 122.56R 6.00 -3.23 5.06 5967099 .89
8.41 4970. 32 5051 .82 7277 .10 7277. 98 63.45 --- .6.00 -3.23 5.06 5967113 .48
8.41 4990. 00 5071 .50 8305 .23 8302. 45 214.83 --- 0.00 0.00 0.00 5968140 .00
611980.29 N 70.31085428 W 149.09257805
611980.00 N 70.31086776 W 149.09257982
611979.72 N 70.31088052 W 149.092581.51
611920.53 N 70.31357557 W 149.09294202
611920.00 N 70.31360205 W 149.09294517
611919.78 N 70.31361499 W 149.09294641
611919.65
611900.86
611900.00
611900.02
611901.07
611919.46
611920.00
611922.23
611936.29
611938.64
N 70.31362285 W 149.09294707
N 70.31484984 W 149.09304516
N 70.31496880 W 149.09304684
N 70.31498042 W 149.06
N 70.31508749 W 149.0 5
N 70.31616633 W 149.09283611
N 70.31619732 W 149.09283040
N 70.31631927 W 149.09280693
N 70.31705909 W 149.09266022
N 70.31716056 W 149.09263671
611940.00 N 70.31720729 W 149.09262359
611940.81 N 70.31723259 W 149.09261587
611998.74 N 70.31897216 W 149.09206933
612000.00 N 70.31900787 W 149.09205750
612002.21 N 70.31906212 W 149.09203714
612003.93 N 70.31909916 W 149.09202158
612140.00 N 70.32189792 W 149.09079436
- 1
WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-204\Plan W-204\Plan W-204L21W-204L2 (P4) Generated 9/13/2006 11:04 AM Page 2 of 2
by
Schlumberher
WELL W-204L1 (P4) FIELD Prudhoe Bay Unit - WOA 6TRUDTURE W-PAD
Magne4c Parameters 6Wace Loc alnn NhD2] Alasxa State Planes. Zone Di. US Feet MiscelGneous
MoOel: BGGM 201]fi Rp: 80.084° Oate: December 0], 2006 N101J 6].I ]9 NoMing. 595983600 RUH GeN DOnv: .0.85435460' Slot: W-Z04 NDRef: Rotaly Table IH1.00 ttabove MGLI
Mag Dec: *23932" F6: 5]6353 nT Lon. WI49533130 Eating. 612049.00 RUB Scale FxL 0.9999142622 Plan: W-Z04L2IP41 6rvy Date: 6eptemcerl3, 2006
4000
O
O
O
E 5000
11
N
N
U
6000
1000 2000 3000 4000 5000 6000 7000 8000
9000
Top Whipstock
• Base Whipstock
-204SP81..- .- KOP Crv 10/1 OqN-204C208a Tgtt : : ,.. ,, __.__ _ ,
a Crv 10/100 En~Crv
End Crv W-204L2 OBa Tgt 2 W-204L2 OBa Tgt 4 W-204L2 OBaTgt 6 W-204L2 OBp Tgt a W_204L2 OBa~T~t 10 TD / 4-7/2" Lnr
Crv 6A 00 End Crv Crv 6/100 End Cry Crv 6!100 End Crv Crv 6/•,100 End Crv Crv 61j00 Entl Crv
-..-..-..-.. .-.._.._. .. -..-..-;.-..-..-..-..-.. .. -.. ~..-..-..-..-.. -..- . ..-.. T..-..-.. -..-..-.._..-..-..~.. .-..-..-..-..-..-..-.. .. -..- - -t.-..-.. _.
. . .. ..
° W-2041111P4)
W 204
PB)
Crv. 6/100 End Crv
Crv:6/100 Crv 6/100
End Crv rv End Crv :
End
4 Crv &100 (
W-20
7-6/8" Csg Pt 4L2 Osa Tg[ 3
W-204L2 Oda Tgt 6 W-204L2 OBa Tgt 7 W;204L2 OBa Tgt 9
4000
5000
6000
1000 2000 3000 4000 5000 6000 7000
Vertical Section (ft) Azim = 1.52°, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-V
8000 9000
r bP
Schlumberger
WELL FIELG STRUCTURE
W-204L1 (P4) Prudhoe Bay Unit - WOA W-PAD
Ma9^eOC Parameters 6urlaca L^calron NAG2] AWSka State Planes. Zone 04. US Feet Miwellaneous
Motlef. BGGM 2006 tip: 80864° Oate: Oecamber o]. 3006 Lal. N)01I 5).I ]9 Naltbirg'. 595983600flUS Grq Conv' a0.854354E0' 6101 W-204 NO Rei. Rotary Table 18150 Rab^ve MSLI
Mag Oec'. ~2J932° FS'. 5]6JS.J nT Lon. W1495 ]3.130 EasM1n9'. 61204900 RUS Scale Fact. 0.9999142622 W-204L21P41 Srvy Gate September lJ. 2006
-2000 -1000 0 1000 2000
8000
7000
6000
n
n
n
Z
5000
0
0
0
c
m
v 4000
N
v
v
v
3000
2000
1000
8000
7000
6000
5000
4000
3000
2000
1000
-2000 -1000 0 1000 2000
«< W Scale = 1(in):1000(ft) E »>
BP Alaska
Anticollision Report
Company: BP Amoco
Field: Prudhoe Bay
Reference Site: PB W Pad
Refercnce Well: Plan W-204
Reference Wellpath: Plan W-204L2
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 5.00 ft
Depth Range: 5326.40 to 12649.47 ft
Maximum Radius:10000.00 ft
Survey Program for Definitive Wellpath
'~ Date: 9/13/2006 Validated: No
', Planned From To Survey
', ft ft
28.50 1000.00 Planned: Plan #8 V1 (0)
', 1000.00 3346.00 Planned: Plan #8 V1 (0)
', 3346.00 5326.40 Planned: Plan #8 V1 (0)
5326.40 12649.47 Planned: Plan #4 V1
Bate: 9113/2006 Time: 15:43:58 Page: I
Co-ordinate(NE) Reference: Well: Plan W-204, True North
Vertical ('l'VD) Reference: W-204 Plan 81.5
Ub: Oracle j
Reference: Principal Plan & PLANNED PROGRAM
Error Model: ISCWSA Ellipse
Scan Method: Trav Cylinder North
Error Surface: Ellipse + Casing
Version: 3
Toolcode Tool Name
GYD-GC-SS Gyrodata gyro single shots
MWD+IFR+MS MWD +IFR + Multi Station ',
MWD+IFR+MS MWD +IFR + MuIG Station
MWD+IFR+MS MWD +IFR + Multi Station
Casing Points
-
_--
111D T'VD Diameter - Hole Site Narne
ft ft in in
3345.57 3326.50 10 750 13.500 10 3/4"
5382.68 4999.79 7.625 9.875 7-5/8"
12530.13 5069.23 4.500 6.750 4-1/2"
Summary
- ~ - _ ---
<-------------- Offset Wellpath ----------------> Reference Offset Ctr-Ctr No-Gu
Site Well Wellpath N[D bfD Distance Arca
PB MPTR3
', PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
' PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
~ PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
~, PB W Pad
PB W Pad
', PB W Pad
', PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
', PB W Pad
', PB W Pad
PB W Pad
PB W Pad
MP00151112
Plan W-202
Plan W-204
Plan W-204
Plan W-206
Plan W-208
Plan W-209
Plan W-210
Plan W-213
Plan W-214
Plan W-216
Plan W-217
Plan W-218
Plan W-219
Plan W-220
Plan W-220
Plan W-220
Plan W-221
Plan W-401
W-01
W-01
W-01
W-02
W-02
W-03
W-03
W-04
W-05
W-05
W-06A
W-O6
W-07
W-07
W-08
W-08
W-09
W-09
W-09
W-10
W-10
ft° ft ft ft
MP00151112 V1 10212.61 6340.00 829.46 396.49
Plan W-202 V3 Plan: W- 8638.03 6890.00 592.21 173.91
Plan W-204 V6 Plan: PI 5330.00 5330.00 0.01 0.73
Plan W-204L1 V3 Plan: 5330.00 5330.00 0.01 0.73
Plan W-206 V3 Plan: W-
Plan W-208 V2 Plan: W- 12596.44 10070.00 1565.08 503.31
Plan W-209 V4 Plan: PI
Plan W-210 V5 Plan: PI
Plan W-213 V4 Plan: PI
Allo~~~able
Deviation
ft
432.97
418.30
-0.72
-0.72
1061.77
Plan W-214 V5 Plan: PI 6804.67 5575.00 1314.08 108.54 1205.54
Plan W-216 V11 Plan: W 6919.58 6225.00 1081.83 109.73 972.09
Plan W-217 V3 Plan: W- 7196.45 5210.00 2316.97 145.49 2171.49
Plan W-218 V3 5326.40 30.00 5066.07
Plan W-219 V4 5326.40 30.00 5062.95
Plan W-220 V3 Plan: PI
Plan W-220L1 OBa V1 PI
Plan W-220L2 OA V1 Pla
Plan W-221 V5 Plan: W- 5942.24 3690.00 2575.49 57.88 2517.61
Plan W-401 V1 Plan: PI 7138.55 5517.16 1310.18 83.98 1226.19
W-01 V3
W-01 A V4
W-01AP61 V1
W-02 V4
W-02A V20
W-03 V4
W-03A V1
W-04 V1
W-05 V3
W-05A V2
W-06A V2
W-06 V1
W-07 V1
W-07A V7
W-08 V1
W-08A V12
W-09 V1
W-09A V4
W-09AP61 V9
W-10 V3
W-10A V4
Warning
Pass: Major Risk
Pass: Major Risk
FAIL: NOERRORS
FAIL: NOERRORS
Out of range
Pass: Major Risk
Out of range
Out of range
Out of range
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
No Offset Stations
No Offset Stations
Out of range
Out of range
Out of range
Pass: Major Risk
Pass: Major Risk
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
- ~ , BP Alaska
Anticollision Report
Company: BP AfnOCO Date: 9/13/2006 "time: 15:4.3:58 Page: 2
Field: Prudhoe Bay
Reference Site: PB W Pad Co-ordinat e(NF,) Refe rence: Well: Pla n W-204, Tr ue North
Reference Well: Plan W-204 Vertical (TVD) Refere nce: W-204 P lan 81.5
Reference Wellpath: Plan W-204L2 Db: Oracle i
Summary
<----------- O ffset Wellpath. ------ --------> Reference Offset Ctr-Ctr No-Go ~IIoH°able
Site Well Wellpath ~1D MD Distance Area Deviation Warning
ft ft ft ft ft
I~ PB W Pad
PB W Pad W-11
W-12A W-11 V1
W-12A V3 Out of range
Out of range
PB W Pad W-12 W-12 V1 Out of range
! PB W Pad W-15 W-15 V1 Out of range ',
PB W Pad W-15 W-15A V10 Out of range
PB W Pad W-15 W-15PB1 V6 Out of range !
! PB W Pad W-15 W-15P62 V1 Out of range ',
i PB W Pad W-16 W-16 V3 Out of range !,
! PB W Pad W-16 W-16A V3 Out of range L
PB W Pad W-16 W-16APB1 V1 Out of range !
PB W Pad W-16 W-16L1 V3 Out of range
PB W Pad W-17 W-17 V4 5326.40 9645.00 5747.51 93.34 5654.16 Pass: Major Risk
' PB W Pad W-17 W-17A V9 5326.40 8830.00 4553.51 73.56 4479.95 Pass: Major Risk
!! PB W Pad W-18 W-18 V1 5326.40 7745.00 2944.86 61.52 2883.34 Pass: Major Risk !,
PB W Pad W-19 W-19 V2 5329.21 5425.00 884.19 87.14 797.05 Pass: Major Risk
PB W Pad W-19 W-19A V1 7576.02 5415.00 883.47 95.55 787.92 Pass: Major Risk '~
! PB W Pad W-19 W-19AL1 V3 7576.02 5415.00 883.47 95.55 787.92 Pass: Major Risk
! PB W Pad W-19 W-19AL1 P61 V1 7576.02 5415.00 883.47 95.47 788.00 Pass: Major Risk
PB W Pad W-19 W-19AL1 P62 V1 7576.02 5415.00 883.47 95.47 788.00 Pass: Major Risk
PB W Pad W-200P61 W-200P61 V7 Out of range
! PB W Pad W-200 W-200 V6 Out of range !
!, PB W Pad W-201 W-201 V4 5820.27 4920.00 1971.03 72.16 1898.87 Pass: Major Risk
!, PB W Pad W-203 W-203 V10 Out of range
!, PB W Pad W-203 W-203L1 V8 Out of range
'~
PB W Pad W-203 W-203L2 V4 Out of range !
~
!: PB W Pad W-205 W-205 V6 5983.11 10670.00 4387.97 105.21 4282.77 Pass: Major Risk
PB W Pad W-205 W-205L1 V2 5991.48 10680.00 4362.81 101.67 4261.14 Pass: Major Risk
PB W Pad W-205 W-205L1 PB1 V4 Out of range ',
I PB W Pad W-205 W-205L2 V4 5964.51 10670.00 4336.82 101.91 4234.91 Pass: Major Risk ',
!, PB W Pad W-207 W-207 V10 Out of range !
PB W Pad W-207 W-207P61 V2 Out of range
PB W Pad W-209 W-209 V9 Out of range
PB W Pad W-209 W-209P61 V6 Out of range
!, PB W Pad W-20 W-20 V1 5326.40 7820.00 3145.60 69.83 3075.76 Pass: Major Risk
PB W Pad W-211 W-211 V9 Out of range !,
! PB W Pad W-212 W-212 V12 Out of range
PB W Pad W-215 W-215 V7 5345.34 8015.00 5594.75 82.30 5512.45 Pass: Major Risk !,
PB W Pad W-215 W-215P61 V2 Out of range ',
! PB W Pad W-21 W-21 V3 5326.40 6460.00 1440.25 62.93 1377.32 Pass: Major Risk '~,
PB W Pad W-21 W-21A V12 5326.40 6450.00 1439.95 62.93 1377.02 Pass: Major Risk !
! PB W Pad W-22 W-22 V1 5326.40 6640.00 1717.73 57.02 1660.71 Pass: Major Risk
PB W Pad W-23 W-23 V3 5328.23 5430.00 322.67 68.73 253.94 Pass: Major Risk
! PB W Pad W-23 W-23A V5 5327.96 5420.00 322.52 68.73 253.78 Pass: Major Risk
!I PB W Pad W-24 W-24 V1 5326.40 6925.00 2195.57 51.20 2144.36 Pass: Major Risk
I PB W Pad W-25 W-25 V1 5326.40 6855.00 2720.03 83.53 2636.50 Pass: Major Risk !
PB W Pad W-26A W-26A V6 5866.59 5110.00 2615.92 105.98 2509.93 Pass: Major Risk
! PB W Pad W-26 W-26 V1 5866.58 5110.00 2615.91 105.98 2509.93 Pass: Major Risk !
PB W Pad W-27 W-27 V3 Out of range
PB W Pad W-27 W-27A V3 Out of range !
', PB W Pad W-29 W-29 V1 5327.17 5910.00 1640.34 87.82 1552.52 Pass: Major Risk ~,
! PB W Pad W-30 W-30 V1 5326.40 8270.00 4291.55 71.75 4219.80 Pass: Major Risk ';
I PB W Pad W-31 W-31 V1 5326.40 7945.00 4242.04 241.34 4000.70 Pass: Major Risk '
PB W Pad W-32 W-32 V6 5326.49 5585.00 916.86 77.19 839.67 Pass: Major Risk
!, PB W Pad W-32 W-32A V3 5327.52 5585.00 917.64 77.20 840.43 Pass: Major Risk
PB W Pad W-32 W-32APB1 V13 5327.52 5585.00 917.64 77.03 840.60 Pass: Major Risk j
PB W Pad W-34 W-34 V1 5326.40 9125.00 5291.28 245.59 5045.69 Pass: Major Risk
PB W Pad W-34 W-34A V1 5326.40 9125.00 5291.28 245.59 5045.69 Pass: Major Risk
!, PB W Pad W-34 W-34AP61 V1 5326.40 9125.00 5291.28 245.50 5045.77 Pass: Major Risk !!
PB W Pad W-35 W-35 V1 Out of range ',
,I PB W Pad W-36 W-36 V4 Out of range !
i PB W Pad W-37 W-37 V3 Out of range
~~ PB W Pad W-37 W-37A V3 Out of range
PB W Pad W-38 W-38 V2 Out of range
BP Alaska
Anticollision Report
Company: BP Amoco
Field: Prudhoe Bay
Reference bite: PB W Pad
Reference Wcll: Plan W-204
Reference Wellp ath: Plan W-204L2
Summary
<---------- - gffset Wellpath ------- ------__>
Site Well Wellpath
PB W Pad W-38 W-38A V10
PB W Pad W-39 W-39 V1
PB W Pad W-39 W-39A V2
!, PB W Pad W-400 W-400 V5
~I PB W Pad W-40 W-40 V1
~ PB W Pad W-42 W-42 V1
PB W Pad W-44 W-44 V1
Date: 9!13/2006 Time: 15:43:58 Page: 3
Co-ordinate(NE) Reference: Well: Plan W-204, True North
Vertical (CVD) Reference: W-204 Plan 81.5
Dh: Oracle
Reference Offset Ctr-Ctr No-Go Allo~cahle
MD NID Distance Area Deviation Warning
ft ft ft ft ft
Out of range
Out of range ',
Out of range i
Out of range 'i
Out of range
Out of range
5326.40 10010.00 7016.03 103.83 6912.20 Pass: Major Risk
•
', FieldPrudhoe Bay
SitePB W Pad
Well :Plan W-204
';WellpathElan W-204L2
~ •
~'~~~iS:~I~'~'~~. I..~~~TE~ ~'If$ECKI.I~~C
~,~®evelopment Ser`~ise Explorato~ Stratigraphic Vest
Yon-Conventional W"ell
Cirele Appropriate Letter ~` Paragraphs to be Ineluded in Transmittal Letter
CHECK ADD-ONS TEXT FOR APPRO`'AL LETTER
WHAT (OPTIONS)
APPLIES '~
~tl;"LTI LATERAL The permit is for a new wellbore segment of e~cistinG
well /~,~~ ~--~~ _
([f last two digits in permit tio~~;./~
AP[ number are ~~ :aP[ No. ~0-~-~ 33 ~ 3 _~
bettiveen 60-69) ,Production should continue to be reported as a function of the
~riGinal AP[ number stated above.
PILOT HOLE (n accordance with ~0 :-SAC ?~.00~(tl, all records, data and logs
acquired for the pilot hole must be clearly diffzrentiated in both
well name ( PH) and API number
! ~~- - - ) from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTIO\' ?~.0~~ Approval to perforate and produce infect is contingent
upon issuance of a conservation order approving a spacing
exception. assumes the
!iabi(ih; of any protest to the spacinG exception that may occur.
DRY" D[TCH .Alf dry ditch sample sets submitted to the Commission must be in
SA:~[PLE ` no Greater than 30' sample intervals from below the permafrost or
', from where samples are first caught and 10' sample intervals
through target zones.
Non-Conventional Please note the following special condition of this permit.
production or production testing of coal bed methane is not allowed
well for (name of we(1~ until after (Company tiame) has designed .and
implemented a water well testing program to provide baseline data
on water quality and quantity. ("Company tiame) must contact the
Commission to obtain advance approval of such water welt testin,
Rey l Za.06
C'jody'trarsmiraf check;ist
---
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, POLARIS OIL-640160_ ___ Well Name: PRUDHOE BAY UN_POLW-204L2 ______Program DEV ___ ________ Well bore seg ~~j
- -- - _
Initial Class/T a DEV 11_01/._ GeoArea Unit On/Off Shore On _ Annular Dis osal [
PTD#:2061600 Company BP EXPLORATION ~$KA) INC_ _ _ _ _-_ -__ - YP - - --- - ------- p
Administration 1 Permit fee attached _ _ _ _ _ Yes _ _ _ __ r - - -
I2 Lease number appropriate Yes
3 Unique well-name and number Yes
1
~4 Well located in a_defined pool Yes
i5 Well located properdistance_fromdnllingunit_boundary_ Yes
16 Well located proper distance f[om other wells _ _ Yes _
7 Sufficient acreage available in_drilling unit_ _ _ _ _ _ Yes
8 If deviated, is wellbore plat_included _ _ _ Yes - -
9 Operator only affectedparty_
Yes
10 Operator has appropriate_bond in force - - __ _ _ _ _ - Yes _ - - _ _ _
X11 Permit can be issued without conservation order_ _ _ _ _ _ Yes _ _ _ _ -
,12 Permitcan be issued without ad_ministrative_approyal
----- Yes
Appr Date
13
Can permit be approved before 15-day wait_
Yes .
RPC 11121/2006 1114 Well located within area an_d_sfrata authorized by Injection Order # (put_10# in_comments)_(For_ NA_
15 All wells within 114 mile area of review identified (For service wel_I only) NA_
,16 _Pre-produced injector; duration of pre p[oduction Less. than_3 months_(For service welt only) . NA.
17 Nonconven. gas conforms to AS31 05 030(j.1.A) (t2.A-D) NA_
18 Conductor stung provided NA_
- -
9
Engineering
I _ _ _ _ _
.
now
_
s a
Surface casing pro
ec _
_ _
NA
I20 CMT not adeguate_to circulate on conductor& surf csg - _ _ _ _ _ _ _ _ _ _ _ -
_ _ _ _
!,21 CMT vol adequate to tie-in long string tosurf csg_ _ _ _ _ - _ NA_
22 _C_MT.will coyer all known productive horizons _ _ _ _ _ No Slotted. _ _ _ _
!
23 Casing designs adequate for C, T, B &_ permafrost- Yes
I
24 Adequate tankage_or reserve pit Yes Nabors]ES,
25 If_a. re-drill, has_a_ 1.0-403 fo_r aba_ndon_ment been approved NA_ , Lateral._
26 Adequate wellbore separation _proposed _ - - - _ Yes
27 If.tlveder required, does it meet_ regulations_ NA_ _ Sidetrack.
X28 Drilling fluid_program schematic & equip listadequate_ YeS Max MW_9.6 ppg.
Appr Date 29 B_OPES, do they meet_regulation _ _ - _ Yes _ - - - _ _ _
WGA 11/21/2006 i30 BOPE press rating appropriate; test to_(put prig in comments)_ Yes Test to 3500_ps. MSP 1750 psi,
31 Choke_manifold complieSw/API_RP-53 (M_ay 84)- _ _ _ _ - _ - _ Yes _ _ _
32 Work willoccurwithoutoperationshutdown_ _ _ _ _ _ Yes- _ _ _ - _ _ - _ - -
33 Is presence of H2S gas. probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - No_ _ _ _ Noi an H2S pad.
134 Mechanical condition of wells within AOR verified fForservice well only) N_A
r
35 _ -
PermRcan be issued w!o hydrogen sulfide measures _ _ _ _ _ _ _
No_
Geolo
9Y _ _~
36 Data presented on_ potential overpressure zones
- NA_
37 Seismic analysis of shallow gas zones_ _ _ NA_
Appr Date 38 Seabed condition surve _ rf off-Shore _ _
y (~ ) NA- - - -
RPC 11!2112006 Ii39 Contact name/phone fo_r weekly_progress reports [exploratory only] .. _ _ _ . _ _ _ . _ _ NA_ _ _ N
A
USDWs
ll
k
n
t
t
1
Geologic Engineering P Date
Commissioner: Date: Commissioner: Date Co
h~,~.,~.t, //-2/-p~ /~-~Z/~o 6
•
•