Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-2391a. Well Status:
GINJ
Oil 1b. Well Class:
5 Exploratory
Service
Hilcorp North Slope, LLC
14. Permit to Drill Number/Sundry
198-239
12/28/1998
2/1/1999
GL PRUDHOE BAY, PRUDHOE OIL
4a.
Surface:
Top of Productive Interval:
Total Depth:
237' FSL, 2434' FEL, SEC. 18, T11N, R13E, UM
2744' FSL, 235' FEL, SEC. 13, T11N, R12E, UM
4918'FSL, 2556'FEL, SEC. 13, T11N, R12E, U
Surface: x- y- Zone -631565 5960810 ASP4
11.
Gas SPLUG 5Abandoned
20AAC 25.105
Suspended
20AAC 25.110
WINJ WAG WDSPL No. of Completions:
10/24/2020
15.
50-029-21170-01-00
16.
PBU U-02A
Well Name and Number:
Surface / Surface
47.46
17.
TPI:y- Zone -628773 ASP4x-5963269
Total Depth: x-y-Zone -626414 ASP45965402
13429 / 8971
none
DNR Approval Number:19.
89-046
5. Directional or Inclination Survey:
Yes No
Submit electronic and printed information per 20 AAC 25.050 (ft MSL)
20.Thickness of Permafrost MD/TVD:
CCL, MWD, DIP, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, aP, MRES, Sonic
CASING WT. PER
FT.GRADE SETTING DEPTH MD
TOP BOTTOM
HOLE SIZE CEMENTING RECORD AMOUNT
PULLED
Location of Well (Governmental Section):
Field/Pool(s):
Date Comp., Susp., or Aband.:6.
Total Depth (MD/TVD):
CASING, LINER AND CEMENTING RECORD
TOP BOTTOM
22.
SETTING DEPTH TVD
9-5/8"
7"
7"
72#
47#
26#
26#
L-80
L-80
L-80
L-80
Surface
Surface
2965'
9607'
9863'
9606'
9879'
Surface
Surface
2965'
8564'
8789'
8563'
8803' 8-1/2"
Scab Liner
12-1/4"
8 cu yds Concrete
2095 cu ft Class 'G', 285 cu ft Permafrost
1028 cu ft Class 'G'
270 cu ft Class 'G'
25.
GRADE PACKER SET (MD/TVD)
26.
4-1/2" 12.6# L-80 9834'
DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED
PRODUCTION TEST27.
Date First Production: N/A
Date of Test:
Flow Tubing
Press
Oil-Bbl:
Oil-Bbl:
Gas-MCF:Water-Bbl:
Oil Gravity - API (corr):
Method of Operation (Flowing, gas lift, etc.):
Gas-Oil Ratio:Choke Size:
Water-Bbl:
See attached
Open to production or injection?Yes No 524.
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
110'36"20"x30"
13-3/8"Surface 2672'17-1/2"3720 cu ft Permafrost 'E' & IISurface2672'
9531' / 8498'
Gas-MCF:
Production for
Test Period
Calculated
24 Hour Rate
Hours Tested:
Casing Press:
110'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
TUBING RECORD
DEPTH SET (MD)
Yes No 5Was hydraulic fracturing used during completion?
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
ADL 047451
319-201
Other
12. SSSV Depth (MD/TVD):
Ref Elevations
BF Surface
(attached)
KB
Form 10-407 Revised 3/2020
Sr Pet Eng Sr Pet Geo Sr Res Eng
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Development
Stratigraphic Test
2.Operator Name:
3.Address:
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
7. Date Spudded:
8. Date TD Reached:
9.
10. Plug Back Depth(MD/TVD):
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
76.54
Water Depth, if Offshore:13.
n/a
0
API Number:
Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
23.
18.Property Designation:
21.Re-drill/Lateral Top Window
MD/TVD:
9879 / 8803
1900 (approx)
5
Submit within 30 days of Completion, Suspension, or Abandonment
By Samantha Carlisle at 9:25 am, Nov 12, 2020
& ADL028283
RBDMS HEW 11/16/2020
Abandonment Date
10/24/2020
HEW
xG
DSR-11/17/2020DLB 11/16/2020
MGR24DEC2020
If yes, list intervals and formations tested, briefly summarizing test results. Attach
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Permafrost - Base
Formation at total depth:
Contact Name:Aras Worthington
Contact Email: aras.worthington@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:Operations Manager
Authorized Signature with Date:Contact Phone:(907)564-4763
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
9869
9904
9963
9988
10026
8795
8825
8873
8891
8915
Sag River
Shublik
Shublik 'B'
Shublik 'C'
Sadlerochit Zone 4
Sadlerochit Zone 4
28.CORE DATA
Conventional Core(s) Yes No 5 Sidewall Cores Yes No 5
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
Well Tested? Yes
10026 8915
Top of Productive Interval 10026 8915
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered):
NAME MD TVD
Permafrost - Top No 5
31. Daily Operations Summary, Wellbore Schematic, Well photosList of Attachments:
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
Digitally signed by Stan Golis
DN: cn=Stan Golis,
ou=Users
Date: 2020.11.11 10:52:23 -
09'00'
Stan Golis
ABANDONED
ALL STRINGS CUT 3'8" BELOW
TUNDRA ELEV. CEMENTED TO
SURFACE & MARKER CAP WELDED
ON 10/24/20
Tbg tag TOC 3034' SLM
cemented
Estimated TOC behind 7" scab 5700' MD
WELL NAME: U-02A
26. Acid, Fracture, Cement Squeeze, Etc.
Depth Interval (MD) Amount & Kind of Material Used
2081 Pull Plug
9540 - 9545 Tubing Punch
9508 14-bbls Class G Cement
9490 Set 4-1/2" cement retainer
9471 - 9476 Tubing Punch
3034 - 9480 283-bbls Class G Cement
2147 - 3034 66-bbls Class G Cement
1300 - 1310 Tubing / Casing Punch
557 145-bbls Class G Cement
539 - 547 Tubing / Casing Punch
Surface 54-bbls Arctic Set 1 cement
Surface 2-gallons Arctic Set 1 cement
ACTIVITY DATE SUMMARY
12/10/2019
***WELL SHUT IN ON ARRIVAL*** (P&A)
PULLED 4-1/2" XX PLUG FROM SVLN @ 2,081' MD
RAN 3.70" CENT., 3" S-BAILER & SAT DOWN @ 7,042' SLM (recovered clay-like
mud)
***WELL LEFT SHUT IN, PAD-OP NOTIFIED***
12/23/2019
CTU #9. 1.75" Coil
Objective: Plug & Abandon
Standby for SLB safety stand down. MIRU
...In progress...
12/24/2019
CTU #9. 1.75" Coil ***Continue from 12/23/19***
Objective: Plug & Abandon
Complete BOP swap. Begin weather standby for -40*
...Incomplete...
12/27/2019
LRS Unit #72: Assist CTU #9 Heat two UR tanks to 130* F. ***JOB COMPLETE ON
27-DEC-2019***
12/28/2019 LRS Unit #46 Assist CTU Heat Upright. Heated Upright #004 to 130*F.
12/29/2019
LRS unit 46 assist CTU heat Diesel Transport. Road unit to location/PJSM/RU to
Diesel transport. *** WSR continued on 12/30/19***
12/29/2019
CTU #9. 1.75" Coil
Objective: Plug & Abandon
Finish rigging up. MU & RIH w/ 1.75" JSN. Tag hard fill at 7200'.
***In Progress***
12/30/2019
CTU #9. 1.75" Coil
Objective: Plug & Abandon
Clean out to 9900', chase returns out of hole. MU & RIH w/ HES GR/CCL logging
tools and 3" JSN. Tag high at 9600', jet down to 9650'. Order out gel and clean out
down to 9887' (corrected depth of 9893'). Was hard fill from 9823' down, had to work
slowly. 9887' was a hard bottom unable to jet through. Log up from compression
***In Progress***
12/30/2019
*** WSR continued from 12/29/19*** LRS unit 46 assist CTU heat Diesel Transport.
(PLUG AND ABANDONMENT) Heated Disel transport to 90*, CTU notified upon
LRS departure.
12/31/2019
CTU #9. 1.75" Coil ***Continue from 12/30/19***
Objective: Plug & Abandon
Painted BLUE FLAG @ 9400', log up to 9300'. POOH. Confirm good data, (+13'
correction, correlated to tubing tally dated 4-Feb-99). MU & RIH w/ 5' loaded tubing
punch on a swivel. Punch tubing at 9540' - 9545'. POOH. Confirm shots fired, ball
recovered. MU & RIH w/ 2" BDJSN. Circulate diesel to surface from 4500'. Continue
RIH. Correct to nozzle at blue flag, RIH at tag TD at 9893'. Pick up 10' and lay 14 bbls
of 15.8 ppg Class G cement from TD. Pick up to safety at 9000', squeeze 1 bbl.
Clean out with Powervis to 9500'. Estimated TOC = 9500'. POOH chasing at 80% all
the way to surface, jet jewelry along the way. Lay in 60/40 from 2500' to freeze protect
well and coil. RDMO.
***Job Incomplete***
Daily Report of Well Operations
PBU U-02A
Daily Report of Well Operations
PBU U-02A
1/4/2020
CTU #9 1.75" coil
MIRU
**In Progress**
1/7/2020
CTU #9 / 1.75" coil
Job Objective: P & A
BOP Test
*** Continued on 1/8/2020 ***
1/8/2020
CTU #9 / 1.75" coil
Job Objective: P & A
Weekly BOP Test. MU & RIH w/ 3.65" JSN. Tag TOC at 9508' MD. AOGCC
witnessed. POOH. MU and RIH with 4-1/2" one-trip cement retainer. Correct depth
at flag and set retainer at 9490'. Perform state witnessed MIT-T test below cement
retainer. Target pressure = 2500 psi. Pressure coil to 3095 psi with 0.3 bbls 60/40
Meth. MIT-T lost 226 psi in 1st 15 min and 72 psi in 2nd 15 min for a total of 298 psi
in 30 mins. Final pressures 2797 / 153 / 18. POOH.
*** Continued on 1/9/2020 ***
1/8/2020
LRS unit 46 assist CTU heat Uprights (PLUG AND ABANDONMENT)
Heat 2 uprights of 9.8 brine to 120 degrees
Heat one upright of 1% KCL to 120 degrees
*** WSR continued on 01/09/20 ***
1/9/2020
CTU #9 / 1.75" coil
Job Objective: P & A
MU and RIH with SLB 1-11/16" x 5' tubing punch. Tag top of cement retainer and
correct to bottom shot. Punch tubing from 9471' - 9476'. POOH. Shots fired and ball
recovered. Make up 2.50" BDJSN cementing BHA and RIH.
*** In Progress ***
1/9/2020 *** WSR continued from 01/08/20*** Rigged down and freeze protected equipment
1/10/2020
CTU #9 1.75" Coil Job Objective: P & A
With coil parked at 9480', pump 134 bbl surfactant pill down coil, take returns out
both tubing and IA. Circulate 9.8# brine down coil and start to lose returns after
pumping 186 bbls.Unable to maintain returns as PC leak at 3170' was overbalanced.
Lay in cement from 9480' to PC leak at 3170 with choke closed taking returns to
formation at PC leak. Open choke and still unable to maintain returns from IA.
Attempt to squeeze off PC leak with remainaing cement while leaving tubing leak at
2960' open as a circulation path for 9.8 ppg brine. Unable to obtain squeeze and
current cement top estimated as 3170' in the IA (PC leak) and ~3000' in the tubing
(~40' below tubing leak). Pump 178 bbls of 9.8# brine down IA and freeze protect top
200' with 60/40. Pump 48 bbls of 9.8# brine down tubing and freeze protect top 200'
with 60/40. Start RD.
*** In Progress ***
1/11/2020
CTU #9 1.75" coil Job Objective: P & A
RDMO
***Job Complete***
1/13/2020
T/I/O = VAC/VAC/10. Temp = SI. IA FL (pre CMIT). No AL or Flowline. TBG FL
inconclusive. IA FL @ 390' (21 bbls).
SV, WV, SSV = C. MV = O. IA, OA = OTG. 10:30
Daily Report of Well Operations
PBU U-02A
1/15/2020
T/I/O= -21/-3/4 Temp= S/I CMIT-TxIA Fail unable to achieve psi, Max Applied
Pressure- 2750 psi, Target Pressure- 2500 psi (PLUG AND ABANDONMENT)
Pumped 43 bbls of amb 60/40 down IA slight TxIA communication unable to achieve
test psi . Notified FB WSL Job ended. Notified Pad OP. Hang tags FWHP's = -
20/17/6 SV,SSV,WV=C MV=O IAxO= OTG upon departure
4/8/2020
***WELL S/I ON ARRIVAL*** (p&a)
RAN 3" S. BAILER & TAGGED TOC AT 3,034' SLM
**WELL S/I ON DEPARTURE***
4/12/2020
T/I/O = LOTO/Vac/0+. Temp = SI. IA FL (Fullbore). No flowline. IA FL @ 190'
(10.2 bbls).
SV, WV, SSV, MV(LOTO) = C. IA, OA = OTG. 02:00.
4/13/2020
T/I/O= 0/0/0. LRS unit 72 Injectivity test. (PLUG AND ABANDONMENT) Pumped 25
bbls of 60/40 Meoh into the TBG at 5 bpm and 350 psi. Bled back 2 bbls to final
T/I/O= 0/0/0. WFO notified of status upon departure. SV, SSV, WV closed. MV open.
IA/OA OTG.
4/20/2020
T/I/O= 0/0/0. LRS Unit 46 Circ out (PLUG AND ABANDONMENT) No flowline
attached. Pumped 5 bbls 60/40 Meoh and 205 bbls 9.8 Brine into TBG taking returns
up the IA to the Open Top. Open top final fluid level of 200 bbls. Pumped 3 bbls 60/40
into TBG for FP. Pumped 8 bbls into IA for FP. Pumped 2 bbls 60/40 into hard line to
Open Top to FP hard line. Tags hung. AFE sign hung. DSO notified upon departure.
FWHP's = 116/107/11
4/27/2020 LRS Unit 46 Heat upright to 90*. *** job continued to 04/28/2020 ***
4/28/2020
...Continued from 04/27/2020... LRS Unit 46 (PLUG AND ABANDONMENT) Heat
Upright to 90*. Pumped 50 bbls 9.8 Bine to 90*. Pad Operator notified upon
departure.
4/28/2020
SLB Pumping Crew - Job Scope: Cement P&A through TBG leak @ 2960' MD and
production casing leak @ 3170' MD RU to circulate down the TBG taking returns
from the IA. Pumped 10 bbl spear of 60/40 methanol, 10bbl fresh water spacer, 66
bbls of 15.8 ppg class G cement, 2 bbl fresh water spacer. Shut down line up to
launch 7" foam ball, Displace ball with 25 bbls 9.8 brine, 3 bbls 60/40 Methanol.. Shut
down and line up down IA with 10 bbls fof 60/40 Methanol pushing cement throuigh
leak points in production casing @ 3170' and possibly 2955'. Shut down and line up
down TBG and pump 3 bbls of 60/40. Tags hung on master and IA. Pad Op
notified/status of well. ***Job Complete***
Foam Ball @ 2037' MD
TOC in TBG = 2194' MD
TOC in IA = 2007' MD
5/3/2020
T/I/O= Temp= SI (LRS Unit 70: Pre-AOGCC CMIT-TxIA)
Pressured up TxIA with 5 bbls of 60/40 and monitored pressure for stabilization for
CMIT-TxIA
...Continued on 05/04/2020...
5/4/2020
...Continued from 05/03/2020...(cmit P&A)
CMIT-TxIA to 2552/2540 psi ***PASSED*** Target = 2500 psi - Max Applied= 2750
psi. Pumped 5.1 total bbls of 60/40 down TxIA to achieve a test pressure of
2591/2578 psi - 1st 15 minute loss of 20/20 psi, 2nd 15 minute loss of 19/18 psi, for a
total loss of 39/38 psi in 30 minutes - Bled TxIA to 0/0 psi - Bled back ~1.5 bbls.
Valve Positions on departure - SV, WV, SSV= Closed - MV= Open - CVs OTG - Tags
hung on SV/IA. Final WHPs= 0/0/0.
***Job Complete***
Daily Report of Well Operations
PBU U-02A
5/7/2020
***WELL S/I ON ARRIVAL***(P&A)
DRIFTED TBG W/ 11' x 2-1/2" DUMMY GUNS(2.66" rings) & 2.50" SAMPLE
BAILER.
TAGGED TOC @ 2147' SLM.(aogcc witnessed, cement sample)
LRS PERFORMED PASSING CMIT-TxIA TO 2624/2647.(aogcc witnessed, see lrs
log)
***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF WELL STATUS***
5/7/2020
(LRS unit 76 Assist SL with AOGCC CMIT) CMIT-TxIA PASSED to 2624/2647psi
***PASSED*** Witnessed by Brian Bixby, Max Applied Pressure=2750 Target
Pressure=2500 psi.
Pressured T/IA to 2663/2688psi with 1.4 bbls 60/40. CMIT-TxIA lost 20/20 psi in 1st
15 minutes and 19/19 psi in 2nd 15 minutes for a total of 39/39 psi during 30 minute
test. Bled TBGP, bled back ~ 1.4 bbls psi ,Slick line in control of well upon
departure. IA/OA = OTG, AFEsign and caution tags hung FWHP=9/23/8
5/8/2020
***WELL SHUT IN UPON ARRIVAL***(ELINE AD PERF FOR P&A)
INTIAL T/I/0=0/0/0
2.5" 10' HSD POWERFLOW 6 SPF 60 DEG 61 TOTAL SHOTS
CORRELATED TO TUBING TALLY-XNIP AT 2081'
CCL TO TOPSHOT=3.29'
CCL STOP DEPTH=1296.71
PRESSURE UP TUBING PRIOR TO PERFORATING
PRIOR TO SHOOTING: T/I/0=440/0/0
PERFORATED INTERVAL=1300'-1310'
PRESSURE UP TUBING AGAIN AFTER SHOOTING T/I/O=400/150/0 CONFIRM
COMMUNICATION
***JOB COMPLETED***
5/23/2020
T/I/O=0/40/55 Arctic Pack Flush (Plug And Abandonment) Pump down tubing and
take returns up OA to tanks. w/ 40 bbls hot (90*) DSL, 20 bbls 9.8 ppg brine
SD for one hour to let diesel soak in OA and loosen Artic Pack Flush w/ 50 bbls
freshwater+surfactant, 110 bbls hot 9.8 ppg brine to flush Arctic Pack,
FWHP=40/55/40. Swab= C, IA & OA= OTG, All block valves=C
5/24/2020
LRS Unit 42- Assist Cement Crew (Plug and Abandonment) Displaced Cement w/ 9
bbls diesel down Tubing. Flushed surface lines w/ 12 bbls Diesel.
Swab/Wing/SSV=C, Master=O, IA, OA=OTG
Daily Report of Well Operations
PBU U-02A
5/24/2020
***ATTEMPT***
***LRS on location as standby for contingency displacement, See AWGRS 5/24/20***
SLB in control of well with portable SSV panel
SLB pumped 5 bbls 60/40 dow tubing to verify flowpath out the OA to OTT
SLB Pumped the following down the tubing taking returns out the OA to OTT: 5 bbls
Fresh water, 145.4 bbls, 15.8 ppg Class G Cement
Took full losses with 78 bbls 15.8 ppg Class G cement pumped, slowed to rate to try
and establish returns pumped additional 67.4 bbls cement
LRS displaced cement in tubing with 9 bbls diesel to 600' MD in order to give access
to the well for future P&A
Verified 88 bbls brine returned to surface from well based on starting strap at tanks.
Tubular fluids at suspected time of losses:
TBG:
15.8 ppg Class G Cement from surface to 1300' MD
IA:
9.8 Nacl from Surface to 1300' MD
OA:
9.8 ppg NaCl from surface to 126' MD
60/40 MEOH from 126' MD to 212' MD
Fresh Water from 212' MD to 298' MD
15.8 ppg Class G Cement from 298' MD to 1300' MD
*** SWAB, SSV shut in, IA & OA CSG Valves OTG upon departure***
Est. TOC in TBG @ ~600' MD
Est. TOC in OA @ ?
Est. BOC in TBG & OA @ ~1300' MD
5/25/2020
T/I/O = Vac0+/0+. Temp = SI. Tbg, IA, & OA FL (FB request). No AL or flowline.
Tbg FL @ near surface. IA FL @ surface. OA FL @ near surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:00
5/31/2020
T/I/O=0/89/30 Temp=SI. OA PT/ verifyT/IA communication (PLUG AND
ABANDONMENT)
OA was fluid packed on arrival. Pressured OA from 50psi to 500psi with 0.23bbl of
9.8ppg NaCl. OA lost 68 psi in 5 minutes. Pressured TBG to 504 psi with 0.12bbl
brine to establish TxIA communication. Unable to establish TxIA communication
below 500psi. SV/WV/SSV=Closed MV=Open CV's=OTG FWHP's=0/95/26
***Job Complete***
6/7/2020
***WELL S/I UPON ARRIVAL*** (Plug and Abandonment)
DRIFT W/ 2.50" X 10' DUMMY GUN & 2-1/2" SAMPLE BAILER. TAGGED TOC @
557' SLM.
PUNCH TBG 539' - 547' W/ 2" POWERFLOW, 6 SPF, 60 DEG PHASE GUN
(verified TxIA communication).
***JOB COMPLETE ON 07-JUN-2020***Punch
Daily Report of Well Operations
PBU U-02A
6/8/2020
T/I/O=95/33/52 Temp= S/I LRS Unit 76. Verify Injectivity to TxIAxOA (P&A)
Pressured up TBG with 0.20 bbls of 50/50 meth/water, IA instantly tracked. Monitored
pressures for 5 min, no OA pressure response. Bled T/IA to starting pressures, bled
back 0.20 bbls. SV WV SSV= closed, MV IA OA= open. Final Whp's= 50/30/53
***Job Complete***
6/12/2020
SLB Pumping Crew. Cement TBG and IA to surface (P&A)
Cemented TBG and IA from 547' to surface by circulating 15bbl of 160degF
Freshwater with 2gal/mgal F103 and UO66, 10bbl Freshwater spacer, followed by
54bbl of 15.8ppg Artic Set 1 cement down the TBG taking returns from the IA. Clean
cement returns after 40bbl away. 100% returns based on returns tank strap. UCA-
2,000psi compressive strength at 49hr 49min.
***Job Complete***
TBG and IA BOC = 547'
TBG and IA TOC = surface
*OA TOC estimated at 300' (See AWGRS 24-May-2020)
6/16/2020
T/I/O=0/0/0 R/D upper production tree, installed tree cap bonnet on top of Master
valve. Torqued to specs. R/D IA valves, installed integrals with 1502 caps. Torqued to
specs. FWP's 0/0/0 see log for details.
6/19/2020
T/I/O = 0+/0/0+. Temp = SI. WHPs (post cement). No flow line or AL. Well house
and scaffold removed. Single gate valve installed on THA. IA CVs removed,
integrals installed on IA =inspection current. Integral installed on OA =inspection
current.
MV = C. IA, OA = OTG. 01:30
10/18/2020
***P&A In Progress*** Pulled cellar box and excavated around wellhead to ~5' below
well pad. Covered excavation with rig mats and demarcated area. LDFN.
10/19/2020 ***P&A In Progress*** Finish excavation to ~5' below tundra. LDFN.
10/20/2020 ***P&A In Progress*** Set shoring box. Set up ventilation plan.
10/22/2020
Permanent Plug and Abandon *** Excavate around wellhead to 12'. Pad elevation @
47.7'. Tundra elevation @ 43.5'. Wellhead cut 3' 8"' below tundra elevation. Found
contaminated cement in OA. AOGCC Rep Mathew Herrera whitnessed cut depth and
cement in all strings. AOGCC Rep asked to remove ~8" from the OA and filled with
AS-1 cement. Schedule AOGCC Rep to confim cement top and marker plate, giving
cement 24 hours to cure. Pictures taken of cut before and after the cement top added
to the OA. Job In Progress.
10/24/2020
***U-02 P&A Job continued*** State inspector MathewHerrera signed off on cement
and marker plate. Marker plate welded and removed shorong box and rig mats. Back
filled and deliniated excavation. Pictures taked of marker plate in place. Job
Complete
MEMORANDUM
TO: Jim Regg
P. I. Supervisor
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: 10/24/2020
FROM: Matt Herrera SUBJECT: Surface Abandonment
Petroleum Inspector PBU U -02A -
Hilcorp North Slope
PTD 1982390; Sundry 319-201
10/22/2020: 1 traveled to Prudhoe Bay Unit U -Pad for a surface abandonment
inspection on well U -02A and met Hilcorp representative Jaycen Sala. Excavation had
been completed and the tree removed. The casing cut was determined to be adequate
(at least 3 feet below tundra grade) and casing tops exposed. All casing strings and the
tubing were filled to surface but upon checking for rigidity of the cement found the outer
annuli (13 3/8" x 9 5/8" OA and 20" x 13 3/8" OOA) was soft and mushy. Hilcorp was
instructed to dig out as much of the soft material from the 2 annuli and top off with fresh
cement. I verified the well information on the marker plate as found in the approved
Sundry. I told Operator to give cement at least 12 hours curing time to harden, and I
would return to verify.
10/23/2020: Traveled back PBU U -02A to verify the cement integrity in the OA and
OOA. The cement had not quite hardened, so Hilcorp was instructed to allow until
morning of the next day to harden and I would return to verify.
10/24/2020: 1 stopped by PBU U -Pad and verified cement top and rigidity. Cement to
surface on all strings was solid. I allowed them to proceed welding on the marker plate
and backfill the excavation.
Attachments: Photos (6) %
2020-1024_Surface_Abandon_PBU _U-02A_mh.docx
Pagel of 4
Surface Abandonment — PBU U -02A (PTD 1982390)
Photos by AOGCC Inspector M. Herrera
10/24/2020
�rt
:R
1 t
W.
Original plate was
undersized; welded
it to another plate
that will cover the
30" x 20" conductor
2020-1024 Surface Abandon PBU U -02A mh.docx
Page 2 of 4
2020-1024—Surface—Abandon PBU U -02A mh.docx
Page 3 of 4
Digging out the
bad cement in
13 3/8" x 9 5/8"
OA
2020-1024—Surface—Abandon PBU U-02A mh.docx
Page 4 of 4
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg �10- 6_ fil(Z t,
P.I. Supervisor
FROM: Brian Bixby
Petroleum Inspector
Section: 18 Township:
Drilling Rig: n/a Rig Elevation:
Operator Rep: Jeremy Grimes
Casing/Tubing Data (depths are MD):
Conductor:
20" X 30" "
0. D.
Shoe@
Surface:
13 3/8"
" 0. D.
Shoe@
Intermediate:
9 5/8"
0. D.
Shoe@
Production:
OA 12 12 12 12
0. D.
Shoe@
Liner:
7" -
0. D.
Shoe@
Tubing:
41/2"
0. D.
Tail@
Plugging Data:
Test Data
DATE: May 7, 2020
SUBJECT: Well Bore Plug & Abandonment
PBU U -02A
BP Exploration
PTD 1982390; Sundry 319-201
11N Range: 13E
n/a Total Depth: 13,429 ft MD
Suspend:
110 - Feet
2,672
Feet
9863
Feet
Csg Cut@
Feet
9879
Feet
9834
Feet
Meridian: Umiat
Lease No.: ADL 28283
P&A: X
Casing
Removal:
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Tbg Cut@
Feet
Type Plug
Founded on
Depth (Btm)
Depth (Top)
MW Above
Verified
Fullbore
Balanced
2955 ft MD
2147 ft MD -
9.8 ppg Brine
Wireline tag
2614
P
OA 12 12 12 12
12
Initial 15 min 30 min 45 min 60 min Result
Tubing
2735
2697
2681 -
2668 -
2659
IA
2758
2698
2665
2638
2614
P
OA 12 12 12 12
12
Tubing
IA
OA
Initial 15 min 30 min 45 min Result
Remarks: _I -
Wireline
Wireline tag so MD's are wireline measurements. Bottom depth of plug could be 3170 ft MD (top of previous plug attempt) or a
casing leak at 2955 ft MD. Good tag of top of cement at 2147 ft MD. Cement is Class "G" 15.8ppg. CMIT TAA Pretest
Pressures T/I/O = 0/7/8 psi. Pumped = 2 bbls; bled back = 1.4 bbls. T/I/O pressure losses every 15 min = 38/60/0, 16/33/0,
13/27/0, 9/24/0. Called and discussed pressures with Mel Rixse and he said it was a PASS.
Attachments: none
rev. 11-28-18 2020-0506_Plug_Verification_PBU_U-02A_bb
MEMORANDUM
TO: Jim Regg I
P.I. Supervisor1SCV )u�z
FROM: Lou Laubenstein
Petroleum Inspector
Section: 18 Township:
Drilling Rig: NA Rig Elevation:
Operator Rep: Kelly McKenney '
State of Alaska
Alaska Oil and Gas Conservation Commission
11N -
NA
DATE: January 8, 2020
SUBJECT: Well Bore Plug & Abandonment
PBU U -02A
BP Exploration (Alaska), Inc '
PTD 1982390; Sundry 319-201 '
Range: 13E Meridian: Umiat -
Total Depth: 13429 ft MD / Lease No.: ADL0028283
Suspend:
P&A: Yes
Casing/Tubing Data (depths are MD): Casing Removal
Conductor:
20" x 30" .
O.D.
Shoe@
100
Feet
Csg Cut@
Feet
Surface:
13-3/8"
O.D.
Shoe@
2672
Feet
Csg Cut@
Feet
Intermediate:
9-5/8"
- 0. D.
Shoe@
9863
Feet
Csg Cut@
Feet
Production:
0. D.
Shoe@
Feet
Csg Cut@
Feet
Liner:
7
0. D.
Shoe@
9879
Feet
Csg Cut@
Feet
Tubing:
4-1/2"
0. D.
Tail@
9834
Feet
Tbg Cut@
Feet
Plugging Data:
Type Plug
Founded on
Depth Btm Depth To
MW Above
Verified
Fullbore
Bottom
9822 ft MD9508 ft MD
9.8 ppg
C.T. Tag -
Tubing
Retainer
9490 ft MD
9.8 ppg
C.T. Tag "
Test Data:
Initial 15 min 30 min d5 min RPsulh
Tubing
3095
2869
2797 '
IA
158
153 -
151
P
OA
18
18
18 '
Remarks:
I arrived on location to witness the tag and pressure test of the bottom cement plug on PBU U -02A. These tests where both to
be completed by a Coil tubing unit. I witnessed the tag on the top of the cement plug (TOC) @ 9508 feet MD . After confirming
the top of the plug 50001b was stacked on top. The operator then pulled up hole and re -tagged showing the TOC to be at the
same depth. The next step was for them to run and set a cement retainer to isolate the tubing above and pressure test the plug.
The retainer was set at a depth 9490ft, the ball was dropped into the coil and pumped down to the retainer. After the ball was
confirmed at the retainer 3700 psi was applied to the coil in order to shear the ball and allow communication below the retainer. I
didn't see any definitive sign that the ball had sheared and allowed communication below the retainer. The operator pulled up
50001b and then stacked 50001b on the retainer confirming it to be set. I asked them how they could give me a 100% positive
answer that the ball was sheared, and we would be testing the cement plug and not just the coil. The tool hand told me that /
pulling up on the coil would allow the ball to drop the rest of the way even if pumping didn't allow it to drop all the way. I
witnessed a passing pressure test on Plug 1 TOC (below retainer) as long as the tool was open. ✓
Attachments: none
rev. 11-28-18 2020-0108_Plug_Verification_PB U_U-02A_II
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Aras Worthington
Interventions and Integrity Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU U -02A
Permit to Drill Number: 198-239
Sundry Number: 319-201
Dear Mr. Worthington:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.Gogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this _ day of April, 2019.
RBDMS41rk' APR 2 6 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
011LUL9e/LU
.APR 18 2019
1. Type of Request. Abandon RI ' Plug Perforations ❑ Fracture Stimulate ❑ Repair -Well ❑ Operdti fdW47b
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0
5. Pemlit to Drill Number 198-239 '
3_ Address: P.O. Box 196612 Anchorage, AK
99519-8612
Stmtigraphic ❑ Service ❑
6. API Number: 50-029-21170-01-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No IIZ
POU U -02A '
9. Property Designation (Lease Number):
10, Field/Pools:
ADL 028283 8 047451
PRUDHOE BAY. PRUDHOE OIL
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD dQ:
Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD:
MPSP (psi):
Plugs (MD): Junk (MD):
13429 -
8971 2081 2081
2081 None
Casing
Length Size MD TVD
Burst Collapse
Structural
Conductor
80 20" x 30" 30-110 30-110
Surface
2642 13-3/8" 30-2672 30-2672
5380 2670
Intermediate
9835 9-5/8" 28-9863 28-8789
6870 4760
Liner
272 7" 9607-9879 8564-8803
7240 5410
Scab Liner
6641 7" 2965-9606 2965-8563
7240 5410
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
1
9904- 13429
Be25 - 8971
4-1/2" 12.6#
L-80
26-9834
Packers and SSSV Type: 4-12" Baker S-3 Penn Packer
Packers and SSSV MD (ft) and TVD (ft): 9531/8498
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 0 Wellbore Schematic 0
13, Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development 0 - Service ❑
14. Estimated Date for Commencing Operations: May 1, 2019
15. Well Status after proposed work:
Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned 0 '
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Alvan, Mike (Udelhoven)
be deviated from without prior written approval.
Contact Email. mike.aivanoatip.com
Authorized Name: Worthington, Ares J Contact Phone: +1 9075645475
Authorized Title: Interventions & Integrity Engineer
Authorized Signature: Date: �// �j2fw * /, r I
�l
dZ/
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: n I ^ -2-o O
•VC NI
Plug Integrity UK' BOP Test ❑ Mechanical Integrity Test W- Location Clearance
Other��` QlfrjC./-ova-wSr �O 'L��.w�
a C.�p.y�-OrrwG,.�
Post Initial lnjecct-ion MIT Req'd? Yes No ❑ RBDMSII APR 2 6 2019
Spacing Exception Required? Yes ❑ No lir/Subsequent Form Required: I0 � y Th
APPROVED BYTHE
gr_7��_
Approved by: COMMISSIONER COMMISSION Date— ZS
IM
ye,
Form 10-403 Revised 04/2017
ORIGINAL
Approved application is wild for 12 months from the date of approval.
jVv64Z23At R1:_('
/may
Submit Form and
Attachments in Duplicate
U-02 P&A
Intervention Engineer
Mike Aivano (907) 564-5475
Aras Worthington (907) 564-4102
Production Engineer
Ryan Thompson (907) 564-4535
Expected Start Date:
May 1, 2019
History:
U-02 was drilled and completed as a conventional Z4 producer in 1985. U-02 had significant
corrosion problems. The original 3-1/2" tubing was replaced 7/90 and a 7" scab liner installed to
repair a casing leak. The well was shut-in 5/19/98 due to repeated casing integrity problems
and poor production, then side tracked in 1999. U -02A reached a depth of 13429' md, —1700'
below plan. The well did not reach the primary target due to high fluid loss intervals, fault
related fractures, and the risk of a poor cement job, thus finalized as a barefoot completion. U -
02A was shut-in 8/26/02 (due to T x IA communication). It passed an NFT on 10/24/02 but POP
attempts were unsuccessful due to low flow from the reservoir and a hole in the tubing.
Attempts were made change out the GLV from Station #4, it was found damaged and a piece
broken off — possible piece of the GLM sticking out into the wellbore. Fishing runs found fill /
obstructions at —6989' wlm, with several bailing runs recovering the missing GLV fishing neck,
mud like material, solid clay and cement while working down to 7023' wlm. On 12/8/03, a
production casing leak and tubing leak was identified by E -Line LDL at 2960' and in the tubing
and 3170' and in the production casing.
Objective:
Perform a full P&A on the well placing cement plugs in the wellbore. Excavate and cut casings
3' below original tundra level and install marker plate.
DPZ 1: From 2004' and - 6080' and
DPZ 3: Top at 9877' and - did not find the bottom of the DPZ during drilling
Procedural Steps:
Slickline / Fullbore
1. Pull XX Plug from 2081' MD.
2. D&T with Drive Down Bailer as deep as possible, sample fill.
• Last tag was at 7023' wlm on 5/6/2003
U-02 P&A Sundry v3
Coil Tubing
1. RIH with nozzle and clean out 4-1/2" tubing down to the tubing tail (-9834' md).
Risk of breaking through fill and well going on vac - potential stuck pipe.
2. Punch tubing at -9550' md. ( Just below 7"x4-1/2" Prod Packer)
3. Pickup cement nozzle and lay -in cement from the tubing tail at 9834' and to
approximately 9520' md.
• Lay -in -10 bbls of cement as per design ✓
Cement Type/weight:
Class G 15.8 ppg mixed on the fly. Field blend to be =lab
ppg +/- 0.1 ppg
Slurry Temperature:
between 80° and 110°F
Fluid Loss:
40-200cc (20-100cc/30 min)
Compressive
Strength:
2000 psi in 48 hrs.
Thickening Time:
Minimum 4 hours
4. Circulate cement and wellbore clean down to -9520' md.
5. Wait on cement to reach a compressive strength of 500 psi.
6. Pick up DJN Nozzle and RIH to tag TOC - AOGCC Witnessed.
7. MU Cement Retainer and set at -9500' md, just above TOC. Pressure test below
retainer to 2500 psi. - AOGCC Witnessed. ✓
8. RIH with tubing punch for 4-1/2" tubing, tag cement retainer, pick up -10 ft and punch at
-9490' md.
9. Circulate Surfactant Pill and Brine down CT and up Tbg x CT annulus.
25 bbls hot fresh water + surfactant (2gal/mgal F103 and 2 gal/mgal UO67)
• -120 bbls of 9.8 ppg brine
10. Circulate Surfactant Pill and Brine down CT and up IA.
• 50 bbls hot fresh water + surfactant (2gal/mgal F103 and 2 gal/mgal UO67)
• -290 bbls of 9.8 ppg brine
11. Lay -in cement from 9500' and to 2200' md. ✓
• Lay -in -274 bbls of cement as per design
Cement Type/weight:
Class G 15.8 ppg mixed on the fly. Field blend to be =lab
ppg +/- 0.1 ppg
Slurry Temperature:
between 80° and 110°F
Fluid Loss:
40-200cc (20-100cc/30 min)
Compressive
Strength:
2000 psi in 48 hrs.
Thickening Time:
Minimum 8 hours
U-02 P&A Sundry 0
Slickline / Fullbore
1. D&T TOC inside 4-1/2" tubing.
2. MIT -T to 2500 psi.
3. Perforate tubing @ —1300' and (use Eline if Slickline unable)
Fullbore
1. RU to pump down the tubing and take returns from the OA. Pump the following:
• 50 bbls hot (160F) diesel
• 42 bbls hot (160F) 9.8 ppg brine
• SD for one hour to let diesel soak in OA and loosen Arctic Pack
• 50 bbls hot (160 deg) freshwater + surfactant; 2 gal/mgal F103 and 2 gal/mgal
UO67
• 100 bbls hot (160F) 9.8 ppg brine
2. Once clean brine is consistently returned from the OA indicating that all hydrocarbons
have been circulated out of the annuli, pump OA surface cement plug as follows down
tubing.
• 5 bbls MEOH
• 5 bbls freshwater spacer
• 91 bbls of cement per design (15 bbls excess)
• Top of cement will be at surface in the OA
3. Swap valving over to pump down the tubing and up the IA. Pump the following IA and
tubing surface cement plug as follows.
• 104 bbls of cement as per design (15 bbls excess)
• Top of cement will beat surface in the IA and tubing
Cement Type/weight:
Class G 15.8 ppg mixed on the fly. Field blend to be =lab
ppg +/- 0.1 ppg
Slurry Temperature:
between 80° and 110°F
Fluid Loss:
40-200cc (20-100cc/30 min)
Compressive
Strength:
2000 psi in 48 hrs.
Thickening Time:
Minimum 4 hours
D'p
Assist Fullbore with cement job and pump N2 across the wellhead valves to remove
cement, this will help when opening valves in later steps to check pressures.
U-02 P&A Sundry v3
2. Bleed all wellhead pressures to 0 psi.
3. Monitor wellhead pressures 24 hours after the pressures were bled to 0 psi.
Special Projects
1. Excavate and Cutoff all casings and wellhead 3' below original tundra level. Top job the
conductor x 13-3/8" annulus and all other annuli and tub' g with cement as needed.
2. AOGCC witness cement tops in all annuli. ?" m f urwQ�i rt7) �ti•vt��+
3. Bead weld marker capon outermost casing string (Conductor Pipe) to read as follows:
N.t.o.t1ce r
BP Exploration Alaska, Inc. ptw�s
U -02a
PTD # 198-239
API # 50-029-21170-01
Cement Plug Calculations
4-1/2" Tbg
7" 29# x 4-1/2" Tbg
7" 26# x 4-1/2" Tbg
9-5/8" x 4-1/2" Tbg
13-3/8" x 9-5/8" Csg
Lower Cement Plug
Btm
0.0152 bpf
0.0175 bpf
0.0186 bpf
0.0535 bpf
0.0581 bpf
Top Footage Bbls
4-1/2"Tbg 1
98341 9520 3141
9-5/8" x 4-1/2" Tbg 1300 0 13001
1 4.7728
7" 29# x 4-1/2" Tbg
98341 95311 3031
W/ 15 bbls Extra
1 5.3025
9-5/8"x 4-1/2" Tbg
Total Volume
1 10.1
Second Plug
Btm Top Footage Bbls
4-1/2" Tbg
9490 2200 72901
9-5/8" x 4-1/2" Tbg 1300 0 13001
110.808
7" 26# x 4-1/2" Tbg
9490 2965 6525
W/ 15 bbls Extra
121.365
9-5/8"x 4-1/2" Tbg
2965 2200 765
40.9275
Total Volume
273.1
Third Plug
Btm Top Footage Bbls
13-3/8"x 9-5/8" Csg 1300 0 13001
1 75.53
9-5/8" x 4-1/2" Tbg 1300 0 13001
Total Volume
75.5
Total Volume
W/ 15 bbls Extra
90.5
Btm Top Footage Bbls
4-1/2" Tbg 1 1300 0 13001
19.76
9-5/8" x 4-1/2" Tbg 1300 0 13001
69.55
Total Volume
89.3
W/ 15 bbls Extra
104.3
U-02 P&A Sundry v3 4
O
00
O
V
O
O
N
II
N
CL
O
Tbg
Wellbore Schematic
U�� w SAFMNDTEk OLE1N9-5WC8G7/W.3IW-
Est TOC @1806ft „ 70.01007ANDp'0 10311'.--MXYI COMM--
aboveth Arctic Pack
above ----
b
-
2960', Csg Leak @ 3170( & possible @ 2955'/"
Mininum ID = 3.726" @ 9822'
411r HES XN NIPPLE
Est TOC@4824ft-
7" Scab Liner - pumped 10
bbls over for cement volume
-job did not go well. EST TOC
@ 5700 ft
TUMk2WL20•.0383W.V-8277 S80S'
TOPOF r RAR f80C
Fully cemented 7" Liner
41lr TM 1215. L -K A152 W, D_3.9w HM3!'
R3SORATXINSIAAMRY
REF LOG'
ANGLEATTOPPIRF 30.09904'
Now: Rd. b Radiation OB for W W cal pert dN
SIZE I SIF
I ME2VAL I Orr -4z
I SNOT
I SOZ
OPENHOLE
9904-13249 O
OM6"
10
GAS LFT MANDRELS
ST
MO
I TVD
CF
TYPE VLV
ILATCHIIPMI
ODON98 Sill 10113n8 JMCVJO SEf XX RUG 110nNi6)
617E
6
3167
3067
10
UM 0.M
M
0
s
ux
417s
36
CAY OO6E
M
16
/
6x7
fi071
04
CAM OOI.E
M
16
3
6170
7271
71
CAY SO
M
24
1009@
2
8804
7837
71
6111 0.F'
M
0
19152
8;452
29
GIM 11M7
M
0
Est Top of Fill based on SL 2003 @ 7023'slm
6W TT WT LOGGED
MLLOIRNfOW/
9879 -9901'
Cement added during Drilling
U-02 P&A Sundry v3 5
PgOOEBAY LM
NHL NO2A
EB81f M:'1962390
ARM 50-029,21170-01
SEC 16. T11N R13E 237 FSL, 2431 FE
WE REV BY IXXI.B4f5 617E REV BY OOII.BIIS
198A gBC�NL COYIiION 02112A3 JMI(AK VMN6i SAFEIY NNE fEI.
ODON98 Sill 10113n8 JMCVJO SEf XX RUG 110nNi6)
Ni08O/ ASW FTlAL
01D402 10M OONE:IOIS
10N1O2
KM
INO"111on (AW My
U-02 P&A Sundry v3 5
1YLN6iSAFE11'IDiE
1406102 .MNAK 0.V GD
U-02 P&A Sundry v3 5
Cmt in OA, fA, & Tbg from 1300' and
to Surface
0
O
ON 13-3/8"ug@2680
N Csg Leaks @ 3170 and possible 295'.
0- Tbg Leak @ 2960
7" 2611TOLTieback @ 2965'
Est TOC for 9-5/8" Csg @ 4824' —
7"Tieback Est. TOC @ 5700'
4-1/2" Prd Pkr @ 9531'
7" 29# Lnr TOL @ 9606'
TOC from Side Track P&A @ -9739
4-1/2" W LEG @ 9834'
9-5/8" Csg @ 9868'
v
N
41
0
O
F-
M M
n
00
I I
M
N 7" 29k Lnr Cc
O
U -02a Proposed P&A
;•-; Cement added during Drilling Phase
Cement added for P&A
Perf Tbg and IA @ 1300'
Nip @ 2081'
TOC in 4-1/2" Tbg "2200
xh 4-1/2" Tbg `9490
7' Cmt Retainer set @ -9500
: in 4-1/2" Tbg-9520
lip @ 9520'
I Punch @ ^'9545'
ip @ 9554'
V Nip @ 9822'
gill Out Window @ 9879-9904'
6" Open Hole to 13429'
U-02 P&A Sundry v3 6
BP EXPLORATION (ALASKA) INC., PRUDHOE BAY UNIT U -02A (198-239)
PRUDHOE BAY, PRUDHOE OIL
Monthly Production Rates
10,000,000
1,000,000
Y
C
c0
C
G 100,000
LL
v
o
N C 10,000
9 _
� O
o
o m
a t7
LL C 1,000
u
m 100
3
O
L
10
1 4—
Jan-1995
Jan -2000
Jan -2005
Jan -2010
Jan -2015
I Produced Gas (MCFM)
. GOR
Produced Water (BOPM)
—e— Produced Oil (BOPM)
10,000,000
W
d
1,000,000 m
N
M
O
100,000
1
0
O
s
10,000
0
w
w
1,000
O
cr
G
d
K
fD
100 a
(D
3
0
3
.+
30 s
I 1
Jan -2020
SPREADSH EET_1982390_PBU_U-02A_Prod-inject_Curves_W ell_Oil_V 120_20190422.x1sx
4/22/2019
• •
f.;J V"Q#1t , ja
BP Exploration (Alaska) Inc. 2 7 11
Attn: Well Integrity Coordinator, PRB -20 ` ail
Post Office Box 196612
�SIOA
Anchorage, Alaska 99519 -6612 tt��,r' +� ( �
a 2 0 .' �tiri5,�= ` ��" �
ncn
December 20, 2010 2 4 201
AdltiNED JAN Mr. Tom Maunder
• ,
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue J ...• O
Anchorage, Alaska 99501
Subject: Corrosion. Inhibitor Treatments of GPB U Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from U Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Jerry
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
. •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
U -pad
Date: 12/20/10
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
U - 1920110 50029222440000 NA 0.8 NA 3.4 1/12/2010
U -02A 1982390 50029211700100 NA 0.6 NA 1.7 1/12/2010
U-03 1841470 50029211730000 NA 0.4 NA 1.7 1/12/2010
U -05A 2090700 50029211920100 NA 0.6 NA 3.4 1/12/2010
1/13/2010
U -066 2050640 50029211170200 NA 1.9 NA 15.3
U -07 1840900 50029211270000 NA 0.6 NA 5.1 1/13/2010
U -08A 1982020 50029211360100 NA 1.4 NA 8.5 1/13/2010
U -09A 1982120 50029211440100 NA 0.2 NA 1.7 1/13/2010
U -10 1851970 50029214230000 NA 7.7 NA 57.8 12/28/2009
U -11B 1931080 50029214200200 NA 0.8 NA 5.1 1/13/2010
U -12A 2041470 50029214090100 NA 0.6 NA 3.4 1/12/2010
U -13 1781010 50029203550000_ NA 0.1 NA 3.4 1/12/2010
U -14 1931000 50029223860000 NA 0.1 NA 1.7 1/13/2010
U -15B 2011970 50029225650200 NA 1.4 NA 13.6 1/13/2010
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
1-01/J-19 \ X~ -(1 ~ ..,1-
U-02A q 55 ~ ;::)"2C;
0.5. 09-20 "~~-O4
W-17 ~S{"'(f')q ~
G-15A C'~ ~I ~~
01-33 <; ~;:"""
0.5. 2-24 <; "'(" )....~ \
0-07 A :¡. -('T'-~
MPS-26 ~Ið ~ '- ðtšf l
MPK-21A n'Q3'" \ l Ot'~
MPS-16 ,gl(j-:2, -CJloL~
Job #
10662975
10708038
10674403
10621748
10564495
10568434
10560320
10572013
10563066
10621740
10563067
Log Description
Date
LDL
LDL
PSP LDL
TEMPERATURE PROFILE
RST-SIGMA
RST-SIGMA
SCMT
SCMT
SCMT
USIT
SCMT
12/04/03
12/09/07
11/26/03
11/28/03
07/11/03
04/15/03
11/10/03
04/21/03
05/30/03
11/01/03
05/31/03
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~e\ ,,-,~ '- ~ ~
i:'- ' \J ~ II'\. -\......),- . (.~ ~ I'o...,^,
SCÞ\¡~NED DEC 3 Û 2003
Blueline
NO. 3068
Company:
12/11/03
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Prints
1
1
1
1
1
1
CD
(
1
1
/ !Q IŸ. 'I' c.:¡
).:::J -:¿ r I ./
2
2
2
2
2
,
.
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
r'~ °J<.". -"""";" :l- ~ \ :( :E 0
ATTN: Beth M':}-"l,.t--- ~ V. ;', . L.
. \\ ,-.. V 1-... ~ ' """'" .
Received by:---D,F r 1? ?{)n~
,--.... -- -.".....,.-
Ala3k~ OJ¡ (.. Gz\s Üms. COmmjs~n
Ar¡çhc?jt!ge
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
Julie Heusser,
Commissioner
Tom Maunder,
P. I. Supervisor
DATE: April 17, 2001
FROM: Lou Gdmaldi, SUBJECT-
Petroleum Inspector
SVS Tests
BPX U-pad
Prudhoe Bay Field
Tuesday, A~3ril 17, 200!; I witnessed the Semi-Annual SVS tests on BPX U pad in
the Western Operating Area of the Prudhoe Bay Field.
Merv Liddelow performed the SVS tests today. The test results (No Failures) are
noted on the accompanied SVS test spreadsheet. Ali well houses were in "OK"
condition.
The pad was clean and in good condition.
SUMMARY: I witnessed the SVS test on U pad in the Prudhoe Bay Field.
2 wells, 6 components, No failures.
Attachments: SVS PBU U pad 4-1-01 LG.XLS
NON-CONFIDENTIAL
SVS PBU U pad 4-17-01 LG
AlasEa-Oil and Gas Conservation Commissar.~
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Liddelow
AOGCC Rep: Lou Grimaldi
Submitted By: Lou Grimaldi Date:
Field/Unit/Pad: ,Pruhoe BaY Held,. ,U pad
Separator psi: LPS 159 HPS
l'7-Apr
Well Pemit Separ Set L~ Test T~t Test Date oil WAG, G~J,
Number Number PSI PSI , Trip Code ,Code Cgde Passed G~or~CLE
U-02A 1982~90 15b .... 125 115 P P OIL
..
U-06A 1990760
, , ,,
U207 1840900
U_08A "19820~'0 ......
..... .
U-09A 1982120 159 125 100 P P ' OIL
U-I~B 1931080 159 125 90 P P ' 0IL
, .. , . ..
U-12 1851820
~ ,i , ,,
U-13 1781010 159 125 110 P P O~
. [ , , . , ,,. . , , · . . ., , ., , , , , ,
U-14 1931000 159 125 100 P P OIL
.. ,, , ..
U-15A 1950970
.,, ,., . . . .,
Wells: 5 Components: t0 Failures: 0 Failure Rate: 0.00% [2 90 var
Remarks:
RJF 1/16/01 Page 1 ofl SVS PBUU pad 4-17-01 LG
198-239-0 PRUDHOE BAY UNIT U-02A 50- 029-21170-01
Roll #1: Start: Stop Roll #2: Start Stop
MD 13429 TVD 08971 Completion Date: ~/2~6/99 Completed Status: 1-OIL
BP EXPLORATION
(ALASKA) INC
Current:
T Name Interval Sent Received
D 9295 ff_.A~~'' SPERRY GR/EWR4 PB1 OH 8/31/99 8/31/99
D 9296 ~"f-i3 SPERRY GR/EWR4 OH 8/31/99 8/31/99
L DGR/EWR4-MD ~F~AL 9715-13429 OH 9/9/99 9/14/99
L DGR/EWR4-MD ~.~F~lq'AL 9715-15568 PB1 OH 9/9/99 9/14/99
L DGR/EWR4-TVD D4eINAL 8659-8971 OH 9/9/99 9/14/99
L DGR/EWR4-TVD t~.'~HAL 8659-9~0.025 PB1 OH 9/9/99 9/14/99
R SRVY RPT (~'"~Y 10217.15-13429. OH 3/15/99 3/15/99
R SRVYRPT ~RRY 9791.54-15628. PB1 OH 3/15/99 3/15/99
T/C/D
D
Thursday, February 01,2001 Page I of I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION ':"'"'
WELL COMPLETION OR RECOMPLETION REPORT AND LO '61~, ~:~/, ,~,; ~i'?,, ~::~j~.~., .......
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [~] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 98-239
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21170-01
4. Location of well at surface :}- ~.::.~ .:-~ ¢~.~:;-::-.~ ............... ~'-~.~. 9. Unit or Lease Name
237' NSL, 2434' WEb, SEC. 18, T11N, R13E, UM ~'~.'~'-; ......
! ~.~./~, ~~£,,~,__~,~.~ '~. Prudhoe Bay Unit
At top of productive interval ~ 10. Well Number
2744' NSL, 235' WEb, SEC. 13, T11N, R12E, UM _.~~4'. '_~-.~ U-02A
At total depth .i{ ~,;.~u:~; :. ~~'~ ' 11. Field and Pool
4918'NSL, 2556'WEL, SEC. 13, T11N, R12E, U~ ..... "~--' ; ~:': '
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 76.54I ADb 047451
12. Date Spudded12/28/98 113' Date T'D' Reached J 14' Date C°mp" Susp" °r Aband'115' Water depth' if OffshOre 116' N°' °f C°mpleti°ns2/1/99 2/6/99 N/A MSLI One
17. Total Depth (MD+TVD) 118. mug Back Depth (MD+T VD) II9. Directional Survey 120. Depth where SSS V set 121. Thickness of Permafrost
13429 8971 FTt 13429 8971 FTI [~Yes []NoI (Nipple) 2081' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, DIP, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, aP, MRES, Sonic
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20"x 30" Insulated Conductor Surface 110' 36" Bcu )/ds concrete
13-3/8" 72# L-80 Surface 2680' 17-1/2" 3720 cu ft Permafrost 'E' & II
9-5/8" 47# L-80 Surface 9871' 12-1/4" 2095 cuft Class 'G', 285 cuft Permafrost
....
7" 26# L-80 2965' 9604' 8-1/2" 1028 cu ft Class 'G' (Scab Liner)
7" 26# L-80 9607' 9879' 8-1/2" _~70 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
6" Open Hole Completion 4-1/2", 12.6#, L-80 9834' 9531'
MD TVD MD TVD
9879' - 13429' 8804' - 8971'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 152 Bbls of Diesel
27. PRODUCTION TEST [ I i" I1 1 g I
Date First Production I Method of Operation (Flowing, gas lift, etc.) ~- v ~ ~ ¥., ~ L...
February 18, 1999 I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure iCALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR)
Press. !24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 9869' 8795'
Shublik 9904' 8825'
Shublik 'B' 9963' 8873'
Shublik 'C' 9988' 8891'
Top of Sadlerochit 10026' 8915'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the fo/egoing is true and correct to the best of my knowledge
Signed TerrieNubble~"'" ,! ~_~, ~ Title Technical Assistant III Date 0~']S' ¢(~
U-02A 98-239 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
18 Dec 98
19 Dec 98
20 Dec 98
21 Dec 98
22 Dec 98
23 Dec 98
PB U Pad
17:00-17:30
17:30-21:00
21:00-01:00
01:00-04:00
04:00-06:00
06:00-08:00
08:00-09:00
09:00-10:30
10:30-12:00
12:00-13:30
13:30-17:00
17:00-20:30
20:30-21:00
21:00-22:30
22:30-23:30
23:30-01:30
01:30-02:00
02:00-03:30
03:30-06:00
06:00-07:00
07:00-08:30
08:30-10:00
10:00-11:30
11:30-15:30
15:30-21:00
21:00-06:00
06:00-06:30
06:30-07:30
07:30-10:00
10:00-11:30
11:30-23:00
23:00-23:30
23:30-00:30
00:30-05:00
05:00-05:30
05:30-06:00
06:00-07:30
07:30-14:00
14:00-21:00
21:00-02:00
02:00-03:00
03:00-04:30
04:30-05:30
05:30-06:00
06:00-09:30
09:30-12:00
12:00-12:15
12:15-17:00
17:00-18:30
18:30-19:30
19:30-20:00
20:00-21:00
21:00-23:00
23:00-04:00
Duration
1/2 hr
3-1/2 hr
4hr
3hr
2hr
2hr
lhr
1-1/2 hr
1-1/2 hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
1/2 hr
1-1/2 hr
lhr
2hr
1/2 hr
1-1/2 hr
2-1/2 hr
lhr
1-1/2 hr
1-1/2 hr
1-1/2 hr
4hr
5-1/2 hr
9hr
1/2 hr
lhr
2-1/2 hr
1-1/2 hr
11-1/2 hr
1/2 hr
lhr
4-1/2 hr
1/2hr
1/2hr
1-1/2 hr
6-1/2 hr
7hr
5hr
lhr
1-1/2 hr
lhr
1/2 hr
3-1/2 hr
2-1/2 hr
1/4 hr
4-3/4 hr
1-1/2 hr
lhr
1/2 hr
lhr
2hr
5hr
Progress Report
Well U-02A
Rig Nabors 9ES
Page
Date
Activity
Held safety meeting
Rig moved 100.00 %
Rigged up Rig services
Rigged up Fluid system
Circulated at 0.0 ft
Circulated at 0.0 ft
Installed Hanger plug
Rigged down Xmas tree
Rigged up BOP stack
Held safety meeting
Rigged up BOP stack
Tested BOP stack
Serviced Top drive
Retrieved Hanger plug
Removed Tubing hanger
Circulated at 9553.0 ft
Laid down 130.0 ft of Tubing
Functioned Retrievable packer
Retrieved Seal assembly
Retrieved Seal assembly
Installed Seal assembly
Tested BOP stack
Retrieved Retrievable packer
Laid down 2100.0 ft of Tubing
Laid down 5540.0 fl of Tubing
Laid down 9553.0 fl of Tubing
Serviced Drillfloor / Derrick
Rigged up Drillstring handling equipment
Made up BHA no. 1
Serviced Block line
R.I.H. to 9344.0 ft
Fished at 9344.0 ft
Circulated at 9344.0 ft
Pulled out of hole to 312.0 ft
Pulled BHA
Laid down fish
Made up BHA no. 2
R.I.H. to 9553.0 fl
Washed over string at 9562.0 ft
Pulled out of hole to 374.0 ft
Pulled BHA
Made up BHA no. 3
Serviced Block line
Serviced Drillfloor / Derrick
R.I.H. to 9554.0 ft
Washed over string at 9715.0 ft
Held safety meeting
Pulled out of hole to 374.0 ft
Pulled BHA
Laid down fish
Held drill (Abandonment)
Serviced Top drive
Rig waited: Materials
Repaired Bottom ram
1
10 February 99
Facility
PB U Pad
Progress Report
Well U-02A
Rig Nabors 9ES
Page
Date
2
10 February 99
Date/Time
24 Dec 98
25 Dec 98
26 Dec 98
27 Dec 98
28 Dec 98
04:00-05:00
05:00-06:00
06:00-06:15
06:15-06:30
06:30-07:00
07:00-11:00
11:00-13:30
13:30-13:45
13:45-18:45
18:45-19:30
19:30-20:30
20:30-21:15
21:15-01:45
01:45-02:00
02:00-06:00
06:00-07:30
07:30-08:30
08:30-09:00
09:00-09:30
09:30-11:00
11:00-11:30
11:30-12:00
12:00-15:30
15:30-16:30
16:30-20:00
20:00-22:30
22:30-23:30
23:30-06:00
06:00-11:30
11:30-13:30
13:30-14:30
14:30-15:00
15:00-15:15
15:15-20:00
20:00-21:30
21:30-22:00
22:00-01:30
01:30-02:00
02:00-02:30
02:30-05:30
05:30-06:00
06:00-12:30
12:30-13:30
13:30-13:45
13:45-14:15
14:15-16:30
16:30-20:30
20:30-21:45
21:45-22:00
22:00-01:30
01:30-03:30
03:30-04:00
04:00-04:30
04:30-06:00
Duration
1 hr
1 hr
1/4 hr
1/4 hr
1/2 hr
4 hr
2-1/2 hr
1/4 hr
5 hr
3/4 hr
1 hr
3/4 hr
4-1/2 hr
1/4 hr
4 hr
1-1/2 hr
1 hr
1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
3-1/2 hr
1 hr
3-1/2 hr
2-1/2 hr
1 hr
6-1/2 hr
5-1/2 hr
2 hr
1 hr
1/2 hr
1/4 hr
4-3/4 hr
1-1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
1/2 hr
3 hr
1/2 hr
6-1/2 hr
1 hr
1/4 hr
1/2 hr
2-1/4 hr
4 hr
1-1/4 hr
1/4 hr
3-1/2 hr
2 hr
1/2 hr
1/2 hr
1-1/2 hr
Activity
Tested Bottom ram
Made up BHA no. 4
Made up BHA no. 4 (cont...)
Held safety meeting
Made up BHA no. 4
R.I.H. to 9647.0 ft
Washed over string at 9693.0 ft
Flow check
Pulled out of hole to 368.0 ft
Pulled BHA
Laid down fish
Made up BHA no. 5
R.I.H. to 9647.0 ft
Fished at 9647.0 ft
Pulled out of hole to 3500.0 ft
Pulled out of hole to 310.0 ft (cont...)
Pulled BHA
Laid down fish
Held safety meeting
Laid down fish
Rigged down Tubing handling equipment
Rigged up Drillstring handling equipment
Made up BHA no. 6
Serviced Block line
Singled in drill pipe to 4425.0 ft
R.I.H. to 9715.0 ft
Tested Casing
Drilled cement to 9752.0 ft
Drilled cement to 9900.0 ft (cont...)
Circulated at 9900.0 ft
Performed cement integrity test
Held drill (Kick (well kill))
Flow check
Pulled out of hole to 881.0 ft
Pulled BHA
Retrieved Wear bushing
Tested BOP stack
Installed Wear bushing
Serviced Top drive
Made up BHA no. 7
R.I.H. to 1500.0 ft
R.I.H. to 9900.0 ft (cont...)
Set tool face
Held safety meeting
Circulated at 9879.0 ft
Drilled to 9892.0 ft
Drilled to 9904.0 ft
Circulated at 9904.0 ft
Flow check
Pulled out of hole to 881.0 ft
Pulled BHA
Serviced BOP stack
Serviced Top drive
Made up BHA no. 8
Progress Report
Facility PB U Pad
Well U-02A Page 3
Rig Nabors 9ES Date 10 February 99
Date/Time
29 Dec 98
30 Dec 98
31 Dec 98
01 Jan 99
02 Jan 99
06:00-07:00
07:00-10:30
10:30-10:45
10:45-11:30
11:30-12:00
12:00-12:30
12:30-13:00
13:00-15:00
15:00-16:00
16:00-21:30
21:30-23:00
23:00-23:15
23:15-03:45
03:45-04:15
04:15-04:30
04:30-05:00
05:00-06:00
06:00-08:30
08:30-14:00
14:00-15:00
15:00-06:00
06:00-20:00
20:00-22:00
22:00-23:00
23:00-23:15
23:15-23:30
23:30-00:00
00:00-00:15
00:15-03:30
03:30-05:00
05:00-06:00
06:00-07:00
07:00-11:00
11:00-11:15
11:15-12:00
12:00-12:15
12:15-13:00
13:00-13:30
13:30-13:45
13:45-14:00
14:00-14:15
14:15-14:30
14:30-01:00
01:00-02:00
02:00-06:00
06:00-18:30
18:30-22:30
22:30-22:45
22:45-00:00
00:00-00:15
00:15-04:30
04:30-06:00
06:00-06:30
Duration
1 hr
3-1/2 hr
1/4 hr
3/4 hr
1/2 hr
1/2 hr
1/2 hr
2 hr
1 hr
5-1/2 hr
1-1/2 hr
1/4 hr
4-1/2 hr
1/2 hr
1/4 hr
1/2 hr
1 hr
2-1/2 hr
5-1/2 hr
1 hr
15hr
14hr
2hr
1 hr
1/4 hr
1/4 hr
1/2 hr
1/4 hr
3-1/4 hr
1-1/2 hr
1 hr
1 hr
4 hr
1/4 hr
3/4 hr
1/4 hr
3/4 hr
1/2 hr
1/4 hr
1/4 hr
1/4 hr
1/4 hr
10-1/2 hr
1 hr
4 hr
12-1/2 hr
4 hr
1/4 hr
1-1/4 hr
1/4 hr
4-1/4 hr
1-1/2 hr
1/2 hr
Activity
Made up BHA no. 8 (cont...)
R.I.H. to 9530.0 ft
Held safety meeting
Serviced Block line
R.I.H. to 9850.0 ft
Set tool face
Reamed to 9904.0 ft
Drilled to 9930.0 ft
Logged hole with LWD: DIR/FE from 9830.0 ft to 9930.0 ft
Drilled to 10152.0 ft
Circulated at 10152.0 ft
Flow check
Pulled out of hole to 199.0 ft
Pulled BHA
Downloaded MWD tool
Serviced Drillfloor / Derrick
Made up BHA no. 9
Made up BHA no. 9
R.I.H. to 10150.0 ft
Logged hole with LWD: Formation evaluation (FE) from 10150.0 ft to
10116.0 fi
Drilled to 10880.0 ft
Drilled to 11491.0 ft
Circulated at 11491.0 ft
Pulled out of hole to 9850.0 ft
Flow check
Circulated at 9850.0 ft
Pulled out of hole to 9500.0 ft
Held safety meeting
Pulled out of hole to 200.0 ft
Pulled BHA
Made up BHA no. 10
Made up BHA no. 10
R.I.H. to 9642.0 ft
Held safety meeting
Serviced Block line
Held safety meeting
Serviced Top drive
R.I.H. to 9860.0 ft
R.I.H. to 11463.0 ft
Took MWD survey at 11463.0 fi
R.I.H. to 11491.0 ft
Circulated at 11491.0 fi
Drilled to 11856.0 ft
Repaired Flowline
Drilled to 11968.0 ft
Drilled to 12541.0 ft (cont...)
Circulated at 12541.0 fi
Flow check
Pulled out of hole to 9850.0 fi
Flow check
Pulled out of hole to 218.0 ft
Pulled BHA
Pulled BHA (cont...)
Progress Report
Facility PB U Pad
Well U-02A
Rig Nabors 9ES
Page 4
Date 10 February 99
Date/Time
06:30-09:00
09:00-10:30
10:30-17:30
17:30-17:45
17:45-18:15
18:15-18:30
18:30-06:00
03 Jan 99 06:00-06:00
04 Jan 99 06:00-10:30
10:30-13:30
13:30-16:00
16:00-16:30
16:30-17:30
17:30-00:00
05 Jan 99 00:00-00:30
00:30-03:30
03:30-06:00
06:00-06:30
06:30-07:30
07:30-08:00
08:00-15:00
15:00-16:30
16:30-06:00
06 Jan 99 06:00-10:30
10:30-11:00
11:00-11:30
11:30-18:00
18:00-19:00
19:00-06:00
07 Jan 99 06:00-14:15
14:15-18:30
18:30-22:00
22:00-23:00
23:00-03:30
08 Jan 99 03:30-06:00
06:00-07:30
07:30-12:30
12:30-13:30
13:30-14:00
14:00-15:00
15:00-19:00
19:00-02:00
09 Jan 99 02:00-04:00
04:00-06:00
06:00-07:00
07:00-11:00
11:00-11:30
11:30-13:00
13:00-16:00
16:00-17:15
17:15-00:15
10 Jan 99 00:15-03:00
03:00-06:00
06:00-10:30
Duration
2-1/2 hr
1-1/2 hr
7 hr
1/4 hr
1/2 hr
1/4 hr
11-1/2 hr
24 hr
4-1/2 hr
3 hr
2-1/2 hr
1/2 hr
1 hr
6-1/2 hr
1/2 hr
3 hr
2-1/2 hr
1/2 hr
1 hr
1/2 hr
7 hr
1-1/2 hr
13-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
6-1/2 hr
1 hr
llhr
8-1/4 hr
4-1/4 hr
3-1/2 hr
1 hr
4-1/2 hr
2-1/2 hr
1-1/2 hr
5 hr
1 hr
1/2 hr
1 hr
4 hr
7 hr
2 hr
2 hr
1 hr
4 hr
1/2 hr
1-1/2 hr
3 hr
1-1/4 hr
7hr
2-3/4 hr
3 hr
4-1/2 hr
Activity
Made up BHA no. 11
Singled in drill pipe to 1650.0 ft
R.I.H. to 10638.0 ft
Took MWD survey at 10638.0 ft
R.I.H. to 12455.0 ft
Washed to 12541.0 ft
Drilled to 13000.0 ft
Drilled to 13800.0 ft (cont...)
Drilled to 13991.0 ft
Circulated at 13991.0 ft
Pulled out of hole to 9842.0 ft
Circulated at 9842.0 ft
Held safety meeting
Pulled out of hole to 150.0 ft
Downloaded MWD tool
Tested BOP stack
Made up BHA no. 12
Made up BHA no. 12
Held safety meeting
Made up BHA no. 12
R.I.H. to 9872.0 ft
Serviced Block line
Drilled to 14211.0 ft
Drilled to 14462.0 ft
Pulled out of hole to 14080.0 ft
R.I.H. to 14462.0 ft
Drilled to 14685.0 ft
Circulated at 14685.0 ft
Drilled to 15081.0 ft
Drilled to 15385.0 ft
Circulated at 15385.0 ft
Pulled out of hole to 9850.0 ft
Circulated at 9850.0 ft
Pulled out of hole to 400.0 ft
Pulled BHA
Made up BHA no. 13
R.I.H. to 7740.0 ft
Singled in drill pipe to 8661.0 ft
R.I.H. to 9781.0 ft
Serviced Block line
R.I.H. to 15385.0 ft
Drilled to 15568.0 ft
Circulated at 15568.0 ft
Circulated at 15568.0 ft
Circulated at 15568.0 ft
Pulled out of hole to 9761.0 ft
Circulated at 9761.0 ft
Circulated at 9761.0 ft
Rest hole at 9761.0 ft
Circulated at 9761.0 ft
Rest hole at 9761.0 ft
Circulated at 9761.0 ft
Rest hole at 9761.0 ft
Rest hole at 9761.0 ft
Progress Report
Facility PB U Pad
Well U-02A
Rig Nabors 9ES
Page 5
Date 10 February 99
Date/Time
10:30-17:30
17:30-18:45
18:45-20:30
20:30-02:00
11 Jan 99 02:00-02:30
02:30-06:00
06:00-09:30
09:30-10:30
10:30-12:00
12:00-13:00
13:00-14:00
14:00-16:00
16:00-17:30
17:30-18:15
18:15-21:00
21:00-21:30
21:30-00:00
12 Jan 99 00:00-06:00
06:00-07:30
07:30-09:30
09:30-14:00
14:00-16:00
16:00-16:30
16:30-18:00
18:00-19:00
19:00-21:00
21:00-23:00
23:00-01:00
13 Jan 99 01:00-02:30
02:30-03:00
03:00-05:30
05:30-06:00
06:00-12:00
12:00-13:30
13:30-14:00
14:00-19:00
19:00-20:00
20:00-22:30
22:30-02:30
14 Jan 99 02:30-03:30
03:30-05:00
05:00-06:00
06:00-08:00
08:00-10:30
10:30-11:00
11:00-23:00
23:00-06:00
15 Jan 99 06:00-08:30
08:30-12:00
12:00-15:00
15:00-20:00
20:00-03:30
16 Jan 99 03:30-06:00
06:00-06:30
Duration
7hr
1-1/4 hr
1-3/4 hr
5-1/2 hr
1/2 hr
3-1/2 hr
3-1/2 hr
1 hr
1-1/2 hr
1 hr
1 hr
2 hr
1-1/2 hr
3/4 hr
2-3/4 hr
1/2 hr
2-1/2 hr
6 hr
1-1/2 hr
2 hr
4-1/2 hr
2 hr
1/2 hr
1-1/2 hr
1 hr
2 hr
2 hr
2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
6 hr
1-1/2 hr
1/2 hr
5 hr
1 hr
2-1/2 hr
4 hr
1 hr
1-1/2 hr
1 hr
2 hr
2-1/2 hr
1/2 hr
12hr
7 hr
2-1/2 hr
3-1/2 hr
3 hr
5 hr
7-1/2 hr
2-1/2 hr
1/2 hr
Activity
Pulled out of hole to 400.0 ft
Pulled BHA
Installed BOP test plug assembly
Tested BOP stack
Retrieved BOP test plug assembly
Made up BHA no. 14
Made up BHA no. 14 (cont...)
Circulated at 0.0 ft
Pulled BHA
Serviced Block line
Pulled BHA
Made up BHA no. 14
Singled in drill pipe to 1726.0 ft
Repaired Draw works
R.I.H. to 6200.0 ft
Held safety meeting
R.I.H. to 9828.0 ft
R.I.H. to 14190.0 ft
Washed to 14486.0 ft
Rest hole at 14486.0 ft
Washed to 15329.0 ft
Drilled to 15628.0 ft
Pulled out of hole to 15200.0 ft
Circulated at 15200.0 ft
Pulled out of hole to 14000.0 ft
Rest hole at 14000.0 ft
Circulated at 14000.0 ft
Rest hole at 14000.0 ft
Circulated at 14000.0 ft
Pulled out of hole to 12800.0 ft
Circulated at 12800.0 ft
R.I.H. to 13770.0 ft
Washed to 15547.0 ft
Rest hole at 15547.0 ft
Pulled out of hole to 15000.0 ft
Circulated at 15000.0 ft
R.I.H. to 15546.0 ft
Mixed and pumped slurry - 50.000 bbl
Pulled out of hole to 14000.0 ft
Circulated at 14000.0 ft
Circulated at 14000.0 ft
Rest hole at 14000.0 ft
Rest hole at 14000.0 ft (cont...)
Circulated at 14000.0 ft
Circulated at 14000.0 ft
Backreamed to 12800.0 ft
Worked stuck pipe at 12745.0 ft
Rigged up Logging/braided cable equipment
Circulated at 12745.0 ft
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations (cont...)
Progress Report
Facility PB U Pad
Well U-02A
Rig Nabors 9ES
Page 6
Date 10 February 99
Date/Time
06:30-08:00
08:00-11:00
11:00-13:00
13:00-14:30
14:30-16:30
16:30-00:00
17 Jan 99 00:00-02:00
02:00-06:00
06:00-07:00
07:00-08:30
08:30-22:00
22:00-01:00
18 Jan 99 01:00-04:00
04:00-05:00
05:00-06:00
06:00-23:00
23:00-00:00
19 Jan 99 00:00-00:15
00:15-05:30
05:30-06:00
06:00-06:30
06:30-10:30
10:30-12:00
12:00-13:30
13:30-16:30
16:30-17:00
17:00-20:30
20:30-00:30
20 Jan 99 00:30-01:30
01:30-03:00
03:00-03:45
03:45-06:00
06:00-06:30
06:30-09:45
09:45-11:00
11:00-12:00
12:00-14:00
14:00-15:00
15:00-16:30
16:30-20:00
20:00-22:00
22:00-23:00
23:00-06:00
21 Jan 99 06:00-06:15
06:15-07:00
07:00-09:00
09:00-10:00
10:00-15:00
15:00-19:30
19:30-21:00
21:00-22:00
22:00-03:00
22 Jan 99 03:00-04:30
04:30-06:00
Duration
1-1/2 hr
3hr
2 hr
1-1/2 hr
2 hr
7-1/2 hr
2 hr
4 hr
1 hr
1-1/2 hr
13-1/2 hr
3 hr
3 hr
1 hr
1 hr
17hr
1 hr
1/4 hr
5-1/4 hr
1/2 hr
1/2 hr
4 hr
1-1/2 hr
1-1/2 hr
3 hr
1/2 hr
3-1/2 hr
4 hr
1 hr
1-1/2 hr
3/4 hr
2-1/4 hr
1/2 hr
3-1/4 hr
1-1/4 hr
1 hr
2 hr
1 hr
1-1/2 hr
3-1/2 hr
2hr
1 hr
7 hr
1/4 hr
3/4 hr
2 hr
1 hr
5 hr
4-1/2 hr
1-1/2 hr
1 hr
5 hr
1-1/2 hr
1-1/2 hr
Activity
Worked stuck pipe at 10980.0 ft
Conducted electric cable operations
Circulated at 10868.0 ft
Pulled out of hole to 9800.0 ft
Serviced Block line
Pulled out of hole to 0.0 ft
Made up BHA no. 15
R.I.H. to 9800.0 ft
Circulated at 9879.0 ft
Washed to 10893.0 ft
Fished at 10893.0 ft
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Rigged down Logging/braided cable equipment
Worked stuck pipe at 10890.0 ft
Jarred stuck pipe at 12893.0 ft
Rigged up Lubricator
Held safety meeting
Conducted electric cable operations
Rigged down Logging/braided cable equipment
Rigged down Logging/braided cable equipment (cont...)
Worked stuck pipe at 12667.0 ft
Rigged up Logging/braided cable equipment
Jarred stuck pipe at 12667.0 ft
Conducted electric cable operations
Circulated at 12667.0 ft
Conducted electric cable operations
Conducted electric cable operations
Serviced Drilling tool / logs
Conducted electric cable operations
Serviced Drilling tool / logs
Conducted electric cable operations
Conducted electric cable operations (cont...)
Serviced Logging/braided cable equipment
Conducted electric cable operations
Rigged down Logging/braided cable equipment
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Functioned Drilling tool / logs
Conducted electric cable operations
Serviced Top drive
Worked stuck pipe at 12667.0 ft
Conducted electric cable operations
Conducted electric cable operations (cont...)
Rigged down Lubricator
Serviced Top drive
Jarred stuck pipe at 12667.0 ft
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Serviced Grease head
Conducted electric cable operations
Jarred stuck pipe at 11014.0 ft
Circulated at 11014.0 ft
Progress Report
Facility PB U Pad
Well U-02A
Rig Nabors 9ES
Page 7
Date 10 February 99
Date/Time
23 Jan 99
24 Jan 99
25 Jan 99
26 Jan 99
27 Jan 99
06:00-07:30
07:30-08:00
08:00-10:00
10:00-13:00
13:00-13:15
13:15-13:30
13:30-13:45
13:45-14:00
14:00-15:00
15:00-15:30
15:30-16:00
16:00-16:30
16:30-18:30
18:30-19:30
19:30-06:00
06:00-08:30
08:30-09:00
09:00-09:30
09:30-10:30
10:30-14:30
14:30-15:00
15:00-15:30
15:30-18:30
18:30-01:30
01:30-02:00
02:00-03:30
03:30-06:00
06:00-06:00
06:00-20:30
20:30-22:00
22:00-22:15
22:15-01:30
01:30-01:45
01:45-02:00
02:00-06:00
06:00-08:00
08:00-09:00
09:00-14:00
14:00-16:30
16:30-17:00
17:00-22:30
22:30-01:30
01:30-02:00
02:00-06:00
06:00-10:30
10:30-12:00
12:00-12:15
12:15-13:30
13:30-13:45
13:45-14:00
14:00-18:00
18:00-19:00
19:00-21:30
21:30-22:00
Duration
1-1/2 hr
1/2 hr
2 hr
3 hr
1/4 hr
1/4 hr
1/4 hr
1/4 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
2 hr
1 hr
10-1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
1 hr
4 hr
1/2 hr
1/2 hr
3hr
7 hr
1/2 hr
1-1/2 hr
2-1/2 hr
24 hr
14-1/2 hr
1-1/2 hr
1/4 hr
3-1/4 hr
1/4 hr
1/4 hr
4hr
2 hr
1 hr
5 hr
2-1/2 hr
1/2 hr
5-1/2 hr
3 hr
1/2 hr
4 hr
4-1/2 hr
1-1/2 hr
1/4 hr
1-1/4 hr
1/4 hr
1/4 hr
4 hr
1 hr
2-1/2 hr
1/2 hr
Activity
Pulled Drillpipe in stands to 9880.0 ft
Serviced Drillfloor / Derrick
Ran Drillpipe to 11010.0 ft (4in OD)
Circulated at 11010.0 ft
Held safety meeting
Mixed and pumped slurry - 32.000 bbl
Displaced slurry - 86.000 bbl
Rigged down High pressure lines
Pulled Drillpipe in stands to 10300.0 ft
Reverse circulated at 10300.0 ft
Circulated at 10300.0 ft
Pulled Drillpipe in stands to 9880.0 ft
Serviced Block line
Serviced Top drive
Pulled Drillpipe in stands to 350.0 ft
Pulled Drillpipe in stands to 350.0 ft (cont...)
Retrieved B ore protector
Installed BOP test plug assembly
Repaired High pressure lines
Tested BOP stack
Retrieved BOP test plug assembly
Installed Bore protector
Made up BHA no. 16
R.I.H. to 10260.0 ft
Circulated at 10260.0 ft
Drilled cement to 10390.0 ft
Drilled to 10430.0 ft
Drilled to 11340.0 ft (cont...)
Drilled to 11810.0 ft (cont...)
Circulated at 11810.0 ft
Flow check
Pulled out of hole to 9880.0 ft
Circulated at 9880.0 ft
Flow check
Pulled out of hole to 189.0 ft
Pulled BHA
Serviced Top drive
Commissioned Additional services
Made up BHA no. 17
Serviced Block line
R.I.H. to 11724.0 ft
Circulated at 11724.0 ft
Washed to 11810.0 ft
Drilled to 11865.0 ft
Drilled to 11939.0 ft (cont...)
Circulated at 11939.0 ft
Flow check
Pulled out of hole to 9880.0 ft
Circulated at 9880.0 ft
Flow check
Pulled out of hole to 215.0 ft
Pulled BHA
Made up BHA no. 18
Serviced Top drive
Facility
PB U Pad
Progress Report
Well U-02A
Rig Nabors 9ES
Page
Date
8
10 February 99
Date/Time
28 Jan 99
29 Jan 99
30 Jan 99
31 Jan 99
01 Feb 99
02 Feb 99
22:00-00:00
00:00-00:30
00:30-04:00
04:00-06:00
06:00-09:00
09:00-10:00
10:00-01:15
01:15-06:00
06:00-10:00
10:00-21:30
21:30-22:00
22:00-22:30
22:30-23:00
23:00-01:00
01:00-02:00
02:00-03:00
03:00-03:30
03:30-04:00
04:00-06:00
06:00-06:30
06:30-07:00
07:00-10:30
10:30-11:30
11:30-12:30
12:30-14:00
14:00-15:30
15:30-16:00
16:00-17:00
17:00-17:30
17:30-20:30
20:30-22:30
22:30-02:30
02:30-04:30
04:30-05:00
05:00-05:30
05:30-06:00
06:00-08:30
08:30-11:30
11:30-19:00
19:00-21:00
21:00-22:30
22:30-02:30
02:30-03:30
03:30-06:00
06:00-06:30
06:30-08:30
08:30-10:30
10:30-18:30
18:30-19:30
19:30-00:00
00:00-02:00
02:00-06:00
06:00-08:00
08:00-09:00
Duration
2 hr
1/2 hr
3-1/2 hr
2 hr
3 hr
lhr
15-1/4 hr
4-3/4 hr
4 hr
11-1/2 hr
1/2 hr
1/2 hr
1/2 hr
2 hr
1 hr
1 hr
1/2 hr
1/2 hr
2 hr
1/2 hr
1/2 hr
3-1/2 hr
1 hr
1 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1 hr
1/2 hr
3 hr
2hr
4 hr
2 hr
1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
3 hr
7-1/2 hr
2hr
1-1/2 hr
4 hr
1 hr
2-1/2 hr
1/2 hr
2 hr
2 hr
8 hr
1 hr
4-1/2 hr
2 hr
4 hr
2 hr
1 hr
Activity
R.I.H. to 4904.0 fl
Held safety meeting
R.I.H. to 11939.0 fl
Drilled to 12020.0 ft
Drilled to 12180.0 fit (cont...)
Serviced Instrument lines
Drilled to 12707.0 fit
Worked toolstring at 12707.0 ft
Worked toolstring at 12707.0 ft (cont...)
Drilled to 13055.0 fit
Rest hole at 13055.0 ft
Circulated at 13055.0 ft
Circulated at 13055.0 ft
Pulled out of hole to 9880.0 fit
Serviced Top drive
Circulated at 9880.0 ft
Circulated at 9880.0 ft
Serviced Internal BOPs
R.I.H. to 12500.0 fit
R.I.H. to 13022.0 fit (cont...)
Washed to 13055.0 ft
Drilled to 13150.0 ft
Circulated at 13150.0 ft
Rest hole at 13100.0 ft
Circulated at 13100.0 fit
Rest hole at 13100.0 fit
Circulated at 13100.0 fit
Pulled out of hole to 9880.0 fit
Flow check
Pulled out of hole to 7700.0 fit
Circulated at 7700.0 ft
Pulled out of hole to 217.0 ft
Pulled BHA
Retrieved B ore protector
Installed BOP test plug assembly
Tested BOP stack
Tested BOP stack (cont...)
Made up BHA no. 19
R.I.H. to 9800.0 fl
Circulated at 9800.0 fit
Serviced Block line
R.I.H. to 13150.0 ft
Drilled to 13195.0 fit
Pulled out of hole to 9880.0 fit
Pulled BHA
Repaired Top drive
R.I.H. to 13.0 ft
Drilled to 13430.0 fit
Pulled out of hole to 12464.0 ft
Pulled out of hole to 9600.0 ft
Circulated at 9600.0 ft
Pulled out of hole to 225.0 fit
Pulled BHA
Made up BHA no. 20
Progress Report
Facility PB U Pad
Well U-02A
Rig Nabors 9ES
Page 9
Date 10 February 99
Date/Time
09:00-14:00
14:00-16:30
16:30-18:00
18:00-20:30
20:30-22:00
22:00-00:30
03 Feb 99 00:30-02:00
02:00-02:30
02:30-03:00
03:00-04:00
04:00-05:00
05:00-06:00
06:00-08:30
08:30-09:00
09:00-10:00
10:00-11:30
11:30-14:00
14:00-15:00
15:00-15:30
15:30-00:30
04 Feb 99 00:30-01:30
01:30-02:30
02:30-06:00
06:00-10:00
10:00-11:00
11:00-17:00
17:00-18:30
18:30-21:30
21:30-00:30
05 Feb 99 00:30-01:00
01:00-06:00
06:00-13:30
13:30-16:30
16:30-17:30
17:30-19:00
19:00-20:30
20:30-22:30
22:30-00:00
06 Feb 99 00:00-05:00
05:00-06:00
06:00-08:30
08:30-09:00
09:00-10:00
10:00-14:00
14:00-16:00
16:00-18:30
18:30-19:00
Duration
5 hr
2-1/2 hr
1-1/2 hr
2-1/2 hr
1-1/2 hr
2-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1 hr
1 hr
1 hr
2-1/2 hr
1/2 hr
1 hr
1-1/2 hr
2-1/2 hr
1 hr
1/2 hr
9 hr
1 hr
1 hr
3-1/2 hr
4 hr
1 hr
6 hr
1-1/2 hr
3 hr
3 hr
1/2 hr
5 hr
7-1/2 hr
3 hr
1 hr
1-1/2 hr
1-1/2 hr
2 hr
1-1/2 hr
5 hr
1 hr
2-1/2 hr
1/2 hr
1 hr
4 hr
2 hr
2-1/2 hr
1/2 hr
Activity
R.I.H. to 9600.0 ft
Circulated at 9600.0 ft
R.I.H. to 13062.0 ft
Circulated at 13062.0 ft
Circulated at 13062.0 ft
Pulled out of hole to 12311.0 ft
Pulled out of hole to 9600.0 ft
Flow check
Circulated at 9600.0 ft
R.I.H. to 10289.0 ft
Worked stuck pipe at 10289.0 ft
Pulled out of hole to 9600.0 ft
Circulated at 9600.0 ft
R.I.H. to 10289.0 ft
Washed to 10289.0 ft
Pumped out of hole to 9600.0 ft
Circulated at 9600.0 ft
Pulled out of hole to 8000.0 fi
R.I.H. to 9600.0 ft
Circulated at 9600.0 ft
Pulled out of hole to
Pulled out of hole to
Laid down 3000.0 ft
Laid down 7000.0 ft
Pulled BHA
Laid down 3000.0 ft
Serviced Block line
9400.0 ft
8500.0 ft
of 4in OD drill pipe
of 4in OD drill pipe
of 4in OD drill pipe
Laid down 2500.0 ft of 4in OD drill pipe
Installed Completion string handling equipment
Held safety meeting
Ran Tubing to 3000.0 ft (4-1/2in OD)
Ran Tubing to 9843.0 ft (4-1/2in OD)
Circulated at 9843.0 ft
Ran Tubing to 9843.0 ft (4-1/2in OD)
Circulated at 9843.0 ft
Set packer at 9544.0 ft with 4000.0 psi
Tested Casing
Installed Hanger plug
Rigged down BOP stack
Rigged up Tubing head spool
Rigged up Adapter spool
Tested Xmas tree equipment
Removed Hanger plug
Circulated at 3167.0 ft
Flow check
Installed Hanger plug
Rig moved 0.00 %
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_ WOA U Pad, Slot U-O2A
U-O2A
Job No. AKMW90047, Surveyed: 1 February, 1999
SURVEY REPORT
15 March, 1999
ORIGINAL
Your Reft API-500292117001
KBE-76.54
Surface Coordinates: 5960810.00 N, 631565.00 E (70° 18' 03.6458" N, 148° 56' 03.7436" W)
Kelly Bushing: 77.50ft above Mean Sea Level
Survey Ref: svy8357
Sperry-Sun Drilling Services
Survey Report for U-O2A
Your Ref: API-500292117001
Job No. AKMW90047, Surveyed: 1 February, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
10217.15
10264.69
10310.76
10354.55
10387.13
10412.51
10444,32
10480.61
10507.72
1O542.97
10574.02
10602.81
10637.14
1O669.08
10698.62
10729.19
10789.49
1O821.O0
10851.74
10883.17
10916.11
10946.31
1O975.66
11007.53
11038.90
85.170
87.440
92.370
92.090
91.600
89.540
86.860
84.170
82.930
82.410
81.800
81.420
82.350
84.330
87.440
90.520
90.370
92.520
94.350
94.280
95.200
95.310
95.330
96.780
97.910
Azim.
354.65O
354.540
355.850
355.100
354.720
351.780
347.760
342.42O
338.910
335.470
332.750
329.480
323.360
321.910
318,970
317.200
315.880
316.170
318.520
318,240
319.570
320.010
321.590
322.030
322,520
Sub-Sea
Depth
(ft)
8890.02
8893.09
8893.16
8891.46
8890.41
8890.16
8891.16
8894.00
8897.04
8901.54
8905.81
8910.01
8914.86
8918.56
8920.68
8921.23
8920.76
8919.96
8918.12
8915.76
8913.03
8910.27
8907.55
8904.19
8900.18
Vertical
Depth
(ft)
8967.52
8970.59
8970.66
8968.96
8967.91
8967.66
8968.66
8971.50
8974.54
8979.04
8983.31
8987.51
8992.36
8996.06
8998.18
8998.73
8998.26
8997.46
8995.62
8993.26
8990.53
8987.77
8985.05
8981.69
8977.68
Local Coordinates Global Coordinates
Northings Eastings Northings Easflngs
(ft) (ft) (ft) (ft)
2678.39 N 2802.09W 5963438.91 N 628716.44 E
2725.61N 2806,56W 5963486.05 N 628711.14 E
2771.51 N 2810.42W 5963531.87 N 628706.48 E
2815.13 N 2813.87W 5963575.42 N 628702.27 E
2847,56 N 2816.76W 5963607.80 N 628698,81 E
2872.76 N 2819.74W 5963632,95 N 628695.39 E
2904.04 N 2825.39W 5963664.12 N 628689.20 E
2938.98 N 2834.69W 5963698.90 N 628679.28 E
2964.40 N 2843,61W 5963724.15 N 628669.92 E
2996.62 N 2857,16W 5963756.13 N 628655.81 E
3024.29 N 2870.58W 5963783.56 N 628641,90 E
3049.22 N 2884.34W 5963808.25 N 628627.71 E
3077.52 N 2903.13W 5963836.22 N 628608,43 E
3102,73 N 2922.38W 5963861,09 N 628588.74 E
3125.44 N 2941.14W 5963883.47 N 628569.58 E
3148.18 N 2961.56W 5963905.85 N 628548,77 E
3191.95 N 3003.04W 5963948.88 N 628506.54 E
3214,62 N 3024,91W 5963971.16 N 628484.27 E
3237.18 N 3045,70W 5963993.36 N 628463.09 E
3260.61 N 3066,51W 5964016.42 N 628441,87 E
3285,35 N 3088,09W 5964040.78 N 628419.86 E
3308.32 N 3107.50W 5964063,40 N 628400.05 E
3330.96 N 3125.97W 5964085.72 N 628381,18 E
3355.87 N 3145.57W 5964110.28 N 628361.16 E
3380,48 N 3164.60W 5964134,55 N 628341.69 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg
Rate
(°/100ft)
Vertical
Section
(ft)
Comment
4.781
11.072
1.827
1.9o3
14.144
15.182
16.435
13.654
9.791
8.897
11.314
17.855
7.665
14.469
11.620
2.203
6.885
9.678
0.916
,4.898
1.496
5.361
4.752
3.921
3755.89
3782,96
3808.84
3833.25
3851.69
3866.65
3886,92
3912,17
3932.42
396O.04
3985.31
4009.54
4039.80
4068.94
4096,43
4125.38
4183,00
4213.18
4242.37
4272,00
4302,94
4331,13
4358.33
4387,63
4416.29
TIE-ON SURVEY
WINDOW POINT
Continued...
15 March, 1999- 9:13 - 2- DrlllQuest
Sperry-Sun Drilling Services
Survey Report for U-O2A
Your Ref: A PI-500292117001
Job No, AKMW90047, Surveyed: 1 February, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
11067.39
11099.69
11129,48
11161.65
11199.16
11224.81
11256.76
11286.32
11318.42
11346.98
11384.13
11411.83
11439.50
11472.4o
11505.84
11536.65
11567.26
11598.62
11627.82
11658.90
11692.99
11722.46
11753.90
11784.43
11816.57
97.740
97.570
97.630
97.250
96.570
96.600
96.21o
95.640
95.540
95.15o
95.800
96.170
96.01o
95.700
95.330
95.580
93.17o
90.340
90.220
91.72o
92.550
92.12o
92.530
90.490
90.030
Azim.
323.440
322.160
323.490
322.560
320.380
318.820
319.670
319.350
319.89o
319.130
319.640
319.350
319.490
320.230
321.190
321.010
322.11o
321.630
322.310
322.690
322.290
321.74o
321.360
322.430
321.060
Sub-Sea
Depth
(ft)
8896.30
8891.99
8888.05
8883.89
8879.37
8876.43
8872.87
8869.82
8866.69
8864.03
8860.49
8857.60
8854.66
8851.31
8848.09
8845.16
8842.83
8841.87
8841.72
8841.20
8839.93
8838.73
8837.45
8836.65
8836.50
Vertical
Depth
(ft)
8973.80
8969.49
8965.55
8961.39
8956.87
8953.93
8950.37
8947.32
8944.19
8941.53
8937.99
8935.10
8932.16
8928.81
8925.59
8922.66
8920.33
8919.37
8919.22
8918.70
8917.43
8916.23
8914.95
8914.15
8914.00
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
3403.01 N 3181.60W 5964156.78 N 628324.30 E
3428.51N 3200.95W 5964181.94 N 628304.51E
3452.04 N 3218.79W 5964205.15 N 628286.26 E
3477.52 N 3237.98W 5964230.29 N 628266.63 E
3506.65 N 3261.17W 5964259.01N 628242.93 E
3526.05 N 3277.69W 5964278.12 N 628226.07 E
3550.11N 3298.42W 5964301.81N 628204.93 E
3572.47 N 3317.51W 5964323.83 N 628185.45 E
3596.80 N 3338.20W 5964347.80 N 628164.33 E
3618.43 N 3356.67W 5964369.10 N 628145.49 E,
3646.50 N 3380.74W 5964396.75 N 628120.93 E
3667.45 N 3398.63W 5964417.38 N 628102.67 E
3688.34 N 3416.53W 5964437.96 N 628084.41 E
3713.36 N 3437.63W 5964462.60 N 628062.88 E
3739.12 N 3458.71W 5964487.99 N 628041.35 E
3762.99 N 3477.97W 5964511.52 N 628021.68 E
3786.90 N 3496.94W 5964535.09 N 628002.29 E
3811.55 N 3516.29W 5964559.40 N 627982.51E
3834.55 N 3534.28W 5964582.08 N 627964.12 E
3859.20 N 3553.20W 5964606.40 N 627944.77 E
3886.23 N 3573.94W 5964633.05 N 627923.56 E
3909.43 N 3592.06W 5964655.94 N 627905.03 E
3934.04 N 3611.60W 5964680.20 N 627885.07 E
3958.05 N 3630.43W 5964703.88 N 627865.82 E
3983.29 N 3650.33W 5964728.76 N 627845.48 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/100fi) (fi)
Comment
3.254 4442.16
3.963 4471.54
4.430 4498.63
3.100 4527.85
6.048 4562.35
6.043 4586.27
2.912 4616.13
2.209 4643.74
1.703 4673.71
2.981 4700.41
2.220 4735.16
1.694 4761.03
0.766 4786.88
2.428 4817.55
3.064 4848.55
0.998 4877.05
8.650 4905.31
9.153 4934.27
2.365 4961.23
4.979 4989.81
2.702 5021.15
2.368 5048.33
1.777 5077.42
7.545 5105.61
4.496 5135.34
Continued,..
15 March, 1999 - 9:13 - 3 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for U-O2A
Your Ref: API-500292117001
Job No, AKMW90047, Surveyed: 1 February, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
1184o.77
11872.76
119o8.65
11934.25
11969.49
11999.91
12029.48
12o63.61
12094.65
12121.31
12156.1o
12186.78
12219.13
12251.60
12280.66
12311.65
12343.41
12372.28
12404.37
12437.35
12465.87
12500.61
12530.98
12560.46
12594.24
89.910
91.27o
92.o3o
92.290
92.350
92.990
93.500
92.650
92.290
9o.120
86.540
85.670
85.590
83.970
84.31o
86.91o
87.560
88.180
89.690
89.290
89.970
93.060
92.960
93.220
93.110
Azim.
321.04o
321.2oo
322.280
321.69o
317.79o
314.07o
311.55o
307.360
305.330
305.840
3o3.790
3o2.61o
300.780
297.460
296.15o
294.91o
295.690
295.14o
294.040
293.700
293.070
293.870
294.260
293.060
290.550
Sub-Sea
Depth
(ft)
8836.51
8836.19
8835.15
8834.19
8832.76
8831.34
8829.67
8827.84
8826.50
8825.94
8826.95
8829.04
8831.50
8834.46
8837.42
8839.80
8841.33
8842.40
8843.00
8843.29
8843.47
8842.56
8840.96
8839.37
8837.51
Vertical
Depth
(ft)
8914.01
8913.69
8912.65
8911.69
8910.26
8908.84
8907.17
8905.34
8904.00
8903.44
8904.45
8906.54
8909.00
8911.96
8914.92
8917.30
8918.83
8919.90
8920.50
8920.79
8920.97
8920.06
8918.46
8916.87
8915.01
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
4002.11N 3665.54W 5964747.31N 627829.94 E
4027.01N 3685.62W 5964771.86 N 627809.43 E
4055.18 N 3707.84W 5964799.63 N 627786.73 E
4075.33 N 3723.59W 5964819.51 N 627770.62 E
4102.20 N 3746.34W 5964845.97 N 627747.40 E
4124.03 N 3767.47W 5964867.43 N 627725.89 E
4144.09 N 3789.13W 5964887.11N 627703.89 E
4165.74 N 3815.44W 5964908.29 N 627677.21 E
4184.12 N 3840.42W 5964926.23 N 627651.91E
4199.63 N 3862.09W 5964941.36 N 627629.97 E.
4219.48 N 3890.63W 5964960.71N 627601.08 E
4236.24 N 3916.25W 5964977.02 N 627575.18 E
4253.18 N 3943.69W 5964993.48 N 627547.44 E
4268.92 N 3971.93W 5965008.72 N 627518.93 E
4281.95 N 3997.73W 5965021.30 N 627492.90 E
4295.27 N 4025.61W 5965034.12 N 627464.80 E
4308.83 N 4054.29W 5965047.18 N 627435.88 E
4321.21 N 4080.35W 5965059.10 N 627409.61 E
4334.56 N 4109.52W 5965071.94 N 627380.21E
4347.90 N 4139.68W 5965084.75 N 627349.82 E
4359.22 N 4165.86W 5965095.61 N 627323.45 E
4373.05 N 4197.71W 5965108.88 N 627291.36 E
4385.42 N 4225.40W 5965120.76 N 627263.46 E
4397.23 N 4252.36W 5965132.10 N 627236.29 E
4409.76 N 4283.68W 5965144.08 N 627204.77 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/lOOft) (fi)
Comment
0.503 5157.83
4.281 5187.54
3.679 5220.72
2.517 5244.34
11.o59 5277.35
12.395 5306.47
8.682 5335.18
12.509 5368.73
6.636 5399.51
8.361 5426.Ol
11.856 5460.62
4.771 5491.16
5.646 5523.39
11.339 5555.72
4.634 5584.60
9.290 5615.43
3.195 5647.07
2.870 5675.85
5.821 5707.82
1.592 5740.64
3.250 5769.Ol
9.188 5803.54
1.324 5833.74
4.159 5863.03
7.426 5896.46
Continued...
15 March, 1999 - 9:13 - 4 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for U-O2A
Your Ref: API-500292117001
Job No. AKMW90047, Surveyed: 1 February, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
12625.40
12660.52
12686.97
12721.2o
12752.36
12779.88
12811.89
12842.04
12875.92
12907.78
12938.58
12968.54
13000.49
13032.70
13062.12
13095.o9
13123.36
13150.23
13192.64
13221.94
13246.46
13278.40
13308.63
13340.00
13372.03
92.870
92.940
91.o8o
88.950
87.560
87.OLO
85.960
85.490
85.330
85.240
85.430
85.740
85.980
85.740
85.250
84.080
83.690
83.880
84.000
84.130
84.030
84.250
84.270
84.160
84.460
Azim.
290.680
290.61o
291.51o
291.55o
291.130
290.870
290.370
290.290
290.790
289.780
289.760
289.980
290.210
289.490
289.070
288.210
287.400
287.490
287.800
287.960
287.860
287.280
287.350
287.180
285.440
Sub-Sea
Depth
(ft)
8835.88
8834.10
8833.17
8833.17
8834.11
8835.42
8837.38
8839.63
8842.34
8844.96
8847.46
8849.77
8852.08
8854,40
8856,71
8859.78
8862.79
8865.70
8870.17
8873.20
8875.73
8878.99
8882.02
8885.18
8888.36
Vertical
Depth
(ft)
8913.38
8911.60
8910.67
8910.67
8911.61
8912.92
8914.88
8917.13
8919.84
8922.46
8924.96
8927.27
8929.58
8931.90
8934.21
8937.28
8940.29
8943.20
8947.67
8950.70
8953.23
8956.49
8959.52
8962.68
8965.86
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
4420.71 N 4312.80 W 5965154.52 N 627175.45 E
4433.08 N 4345.62 W 5965166.31 N 627142.42 E
4442.58 N 4370.29 W 5965175.38 N 627117.59 E
4455.14 N 4402.13W 5965187.38 N 627085.54 E
4466.47 N 4431.14W 5965198.20 N 627056.33 E
4476.33 N 4456.80W 5965207.60 N 627030.50 E
4487.58 N 4486.71W 5965218.33 N 627000.41 E
4498.02 N 4514.90W 5965228.28 N 626972.04 E
4509.87 N 4546.52W 5965239.57 N 626940.21 E
4520.88 N 4576.31W 5965250.06 N 626910.24 E,
4531.26 N 4605.19W 5965259.93 N 626881.17 E
4541.42 N 4633.29W 5965269.59 N 626852.91E
4552.36 N 4663.21W 5965280.02 N 626822,79 E
4563.27 N 4693.43W 5965290.39 N 626792.39 E
4572.96 N 4721.11W 5965299.59 N 626764.54 E
4583.45 N 4752.22W 5965309.54 N 626733.26 E
4592.04 N 4778.98W 5965317.66 N 626706.35 E
4600.05 N 4804.46W 5965325.22 N 626680.73 E
4612.84 N 4844.65W 5965337.30 N 626640.32 E
4621.78 N 4872.39W 5965345.76 N 626612.43 E
4629.28 N 4895.60W 5965352.85 N 626589.10 E
4638.88 N 4925.89W 5965361.91N 626558.64 E
4647.83 N 4954.60W 5965370.36 N 626529.78 E
4657.09 N 4984.41W 5965379.10 N 626499.81 E
4666.04 N 5014.99W 5965387.52 N 626469.07 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/lOOfl) (fi)
Comment
0,876 5927.21
0.282 5961,88
7,811 5988,04
6.224 6021,94
4.660 6052.78
2.21o 6079.97
3,632 6111.55
1.581 6141.24
1.545 6174.61
3.172 6205.96
0,620 6236.23
1.268 6265.69
1.039 6297.14
2.351 6328.82
2.191 6357.69
4.397 6389.94
3.165 6417.48
0.782 6443.61
0.780 6484.90
0.701 6513.46
0.575 6537.36
1.933 6568.46
0.240 6597.87
0.643 6628.39
5.486 6659.43
Continued...
15 March, 1999 - 9:13 - 5 - DrlllQuest
Sperry-Sun Drilling Services
Survey Report for U-O2A
Your Ref: API-500292117001
Job No. AKMW90047, Surveyed: 1 February, 1999
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northlngs Eastings
(ft) (ft) (ft) (ft)
13429.00 84.460 285.440 8893.86 8971.36 4681.14 N 5069.65 W 5965401.65 N 626414.16 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 27.630° (01-Feb-99)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 299.390° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13429.00ft.,
The Bottom Hole Displacement is 6900.32ft., in the Direction of 312.718° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings Comment
(ft) (ft) (ft) (ft)
10217.15 8967.52 2678.39 N 2802.09 W TIE-ON SURVEY
10264.69 8970.59 2725.61 N 2806.56 W WINDOW POINT
13429.00 8971.36 4681.14 N 5069.65 W PROJECTED SURVEY
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/lOOft) (ft)
Comment
0.000 6714.46 PROJECTED SURVEY
15 March, 1999 - 9:13 - 6 - DrlllQuest
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_ WOA U Pad, Slot U-O2A
U-O2APB1
Job No. AKMW90047, Surveyed: 9 January, 1999
ORIGINAL
SURVEY REPORT
3 March, 1999
Your Reft API-500292117070
KBE-76.54
Surface Coordinates: 5960810.00 N, 631565.00 E (70° 18' 03.6458" N, 148° 56' 03.7436" W)
Survey Ref: svy6484
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
9791.54
9879.oo
991o.13
9939.17
9968.33
9998.35
10031.06
10062.1 o
10092.16
1 o 123.79
1 o 154.06
10185.00
lO217.15
10264.69
1031 o.76
10404.12
10497.04
10588.22
10683.33
10776.38
10869.46
1 o9o2.46
10931.03
10963.62
1 lO56.24
28.120
27.580
30.840
36.430
42.930
49.090
56.210
63.420
70.150
76.270
82.010
83.160
85.170
86.710
88.250
85.110
83.310
84.060
86.250
89.050
94.740
97.400
97.890
98.610
100.420
Azim.
314.98o
315.760
318.13o
319.800
321.14o
329.21o
329.460
333.200
337.430
343.16o
347.600
351.6oo
354.650
354.760
354.560
352.570
351.18o
350.360
349.980
349.020
344.560
344.280
343.450
343.940
343.4o0
Sub-Sea
Depth
(ft)
8648.68
8726.01
8753.18
8777.35
8799.78
8820.64
8840.47
8856.07
8867.92
8877.05
8882.76
8886.75
8890.02
8893.39
8895.41
8900.82
8910.19
8920.22
8928.26
8932.07
8928.99
8925.50
8921.70
8917.03
8901.72
Vertical
Depth
(ft)
8726.18
8803.51
8830.68
8854.85
8877.28
8898.14
8917.97
8933.57
8945.42
8954.55
8960.26
8964.25
8967.52
8970.89
8972.91
8978.32
8987.69
8997.72
9005.76
9009.57
9006.49
9003.00
8999.20
8994.53
8979.22
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
2403.83 N 2663.80W 5963166.82 N 628859.52 E
2432.90 N 2692.50W 5963195.39 N 628830.31 E
2444.01 N 2702.86W 5963206.31 N 628819.76 E
2456.15 N 2713.40W 5963218.26 N 628809.01 E
2470.51N 2725.24W 5963232.42 N 628796.92 E
2488.25 N 2737.48W 5963249.94 N 628784.37 E
2510.60 N 2750.73W 5963272.05 N 628770.73 E
2534.14 N 2763.56W 5963295.36 N 628757.49 E
2559.23 N 2775.07W 5963320.25 N 628745.55 E
2587.72 N 2785.24W 5963348.55 N 628734.87 E
2616.47 N 2792.73W 5963377.17 N 628726.88 E
2646.64 N 2798.27W 5963407.24 N 628720.82 E
2678.39 N 2802.09W 5963438.91 N 628716.44 E
2725.60 N 2806.47W 5963486.04 N 628711.24 E
2771.43 N 2810.75W 5963531.79 N 628706.15 E
2864.03 N 2821.19W 5963624.19 N 628694.09 E
2955.54 N 2834.26W 5963715.46 N 628679.43 E
3044.99 N 2848.79W 5963804.64 N 628663.33 E
3138.36 N 2864.97W 5963897.72 N 628645.51 E
3229.77 N 2881.91W 5963988.81 N 628626.98 E
3320.28 N 2903.15W 5964078.94 N 628604.15 E
3351.88 N 2911.97W 5964110.38 N 628594.79 E
3379.08 N 2919.84W 5964137.44N 628586.45 E
3410.04 N 2928.89W 5964168.23 N 628576.85 E
3497.70 N 2954.57W 5964255.43 N 628549.64 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg
Rate
(°ll00ff)
Vertical
Section
(ft)
Comment
0.745
11.11o
19.5o9
22.482
28.168
21.775
25.450
25.849
25.977
23.81o
13.348
11.32o
3.248
3.371
3.980
2.443
1.215
2.337
3.181
7.764
8.1o5
3.351
2.664
2.037
3500.65
3539.93
3554.40
3569.55
3586.90
3606.28
3628.79
3651.52
3673.86
3696.71
3717.34
3736.97
3755.89
3782.87
3809.09
3863.63
3919.92
3976.49
4o36.41
4096.03
4158.95
4182.14
4202.34
4225.42
4290.82
TIE-ON POINT
WINDOW POINT
Continued...
3 March, 1999 - 10:39 - 2 - DrlllQuest
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
11152.2o
11245.85
11338.68
11429.o8
11453.44
11486.04
11516.36
11546.35
11577.25
116o8.7o
11639.51
11670.97
117Ol.9O
11733.50
11768.26
11798.75
11824.09
11862.58
11893.75
11920.68
11956.49
11987.85
12o15.16
121 o8.22
12197.36
99.980
98.370
99.760
98.170
96.1 oo
93.280
9o.68o
87.780
86.14o
84.300
81.17o
81.o50
80.990
8o.510
79.860
80.71 o
81.17o
82.770
83.300
82.740
81.99o
81.49o
81.46o
83.490
86.1oo
Azim.
341.22o
340.13o
339.09o
338.150
337.31o
335.940
335.420
336.000
336.960
335.890
336.420
336.660
335.550
333.520
329.990
327.18o
323.780
319.390
316.060
312.95o
308.990
307.940
308.050
305.700
303.240
Sub-Sea
Depth
(ft)
8884.72
8869.79
8855.16
8841.08
8838.05
8835.38
8834.34
8834.74
8836.38
8839.00
8842.90
8847.76
8852.58
8857.66
8863.59
8868.74
8872.73
8878.11
8881.89
8885.16
8889.92
8894.43
8898.48
8910.66
8918.75
Vertical
Depth
(ft)
8962.22
8947.29
8932.66
8918.58
8915.55
8912.88
8911.84
8912.24
8913.88
8916.50
8920.40
8925.26
8930.08
8935.16
8941.09
8946.24
8950.23
8955.61
8959.39
8962.66
8967.42
8971.93
8975.98
8988.16
8996.25
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
3587.67 N 2983.27W 5964344.88 N 628519.37 E
3674.91 N 3013.86W 5964431.57 N 628487.25 E
3760.83 N 3045.80W 5964516.92 N 628453.82 E
3843.98 N 3078.35W 5964599.49 N 628419.81E
3866.34 N 3087.51W 5964621.69 N 628410.26 E
3896.16 N 3100.40W 5964651.28 N 628396.85 E
3923.77 N 3112.88W 5964678.67 N 628383.89 E
3951.10 N 3125.22W 5964705.78 N 628371.08 E
3979.39 N 3137.53W 5964733.85 N 628358.27 E
4008.12 N 3150.06W 5964762.35 N 628345.24 E
4036.07 N 3162.42W 5964790.08 N 628332.40 E
4064.58 N 3174.79W 5964818.37 N 628319.53 E
4092.51 N 3187.17W 5964846.08 N 628306.66 E
4120.67 N 3200.57W 5964874.00 N 628292.76 E
4150.84 N 3216.78W 5964903.88 N 628276.03 E
4176.48 N 3232.44W 5964929.24 N 628259.92 E
4197.10 N 3246.62W 5964949.61N 628245.39 E
4226.95 N 3270.30W 5964979.04 N 628221.19 E
4249.84 N 3291.11W 5965001.56 N 628199.98 E
4268.57 N 3310.17W 5965019.96 N 628180.60 E
4291.84 N 3336.96W 5965042.75 N 628153.40 E
4311.14 N 3361.26W 5965061.63 N 628128.77 E
4327.77 N 3382.55W 5965077.88 N 628107.19 E
4383.12 N 3456.34W 5965131.93 N 628032.44E
4433.35 N 3529.52W 5965180.87 N 627958.40 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/100ft) (ft)
Comment
2.282 4359.97
2.068 4429.44
1.862 4499.44
2.037 4568.61
9.160 4587.56
9.611 4613.43
8.745 4637.85
9.861 4662.01
6.148 4686.62
6.762 4711.64
10.301 4736.12
0.845 4760.89
3.550 4785.38
6.520 4810.88
10.180 4839.81
9.502 4866.04
13.374 4888.51
12.034 4923.79
10.740 4953.16
11.650 4978.96
11.159 5013.72
3.677 5044.37
0.413 5071.07
3.320 5162.53
4.016 5250.94
Continued...
3 March, 1999 - 10:39 - 3- DrlllQuest
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
12290.19
12382.78
12419.27
12449.65
12478.14
12526.37
12557.63
12587.42
12620.68
12652.26
12682.08
12712.58
12745.30
12771.29
12803.98
12838.77
12864.73
12896.48
12932.46
12958.19
13025.59
13052.20
13145.31
13238.86
13275.67
87.530
87.10o
86.970
87.740
87.560
91.29o
92.920
95.260
98.18o
98.330
96.630
95.740
95.620
96.130
95.940
95.700
96.770
97.180
97.060
98.210
98.950
98.910
98.420
96.160
92.520
Azim.
300.830
297.440
293.690
293.240
292.760
290.650
288.610
286.420
284.800
282,430
279.580
277.940
277.780
277.320
276.170
276.430
276.140
276.570
277.170
275.960
276.780
276.900
278.890
279.400
280.650
Sub-Sea
Depth
(ft)
8923.91
8928.25
8930.14
8931.54
8932.71
8933.19
8932.04
8929.92
8926.03
8921.49
8917.61
8914.32
8911.08
8908.42
8904.99
8901.46
8898.64
8894.78
8890.32
8886.91
8876.85
8872.72
8858.69
8846.82
8844.04
Vertical
Depth
(ft)
9001.41
9005.75
9007.64
9009.04
9010.21
9010.69
9009.54
9007.42
9003.53
8998.99
8995.11
8991.82
8988.58
8985.92
8982.49
8978.96
8976.14
8972.28
8967.82
8964.41
8954.35
8950.22
8936.19
8924.32
8921,54
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
4482.51 N 3608.08W 5965228.65 N 627878.98 E
4527.54 N 3688.86W 5965272.25 N 627797.43 E
4543.26 N 3721.73W 5965287.40 N 627764.29 E
4555.34 N 3749.56W 5965298.99 N 627736.25 E
4566.46 N 3775.77W 5965309.65 N 627709.86 E
4584.30 N 3820.56W 5965326.70 N 627664.75 E
4594.79 N 3849.98W 5965336.67 N 627635.15 E
4603.73 N 3878.32W 5965345.12 N 627606.67 E
4612.62 N 3910.13W 5965353.45 N 627574.71E
4619.98 N 3940.50W 5965360.27 N 627544.21E
4625.62 N 3969.52W 5965365.41N 627515.10 E
4630.24 N 3999.48W 5965369.50 N 627485.06 E
4634.69 N 4031.74W 5965373.38 N 627452.73 E
4638.09 N 4057.37W 5965376.33 N 627427.04 E
4641.90 N 4089.65W 5965379.58 N 627394.70 E
4645.70 N 4124.05W 5965382.78 N 627360.24 E
4648.53 N 4149.70W 5965385.16 N 627334.54 E
4652.02 N 4181.02W 5965388.09 N 627303.16 E
4656.29 N 4216.47W 5965391.74 N 627267.65 E
4659.20 N 4241.80W 5965394.22 N 627242.27 E
4666.60 N 4308.04W 5965400.45 N 627175.91 E
4669.73 N 4334.14W 5965403.12 N 627149.76 E
4682.37 N 4425.31W 5965414.17 N 627058.39 E
4697.12 N 4516.91W 5965427.31 N 626966.53 E
4703.51 N 4553.05W 5965433.06 N 626930.29 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/lOOff) (fi)
Comment
3.015 5343.52
3.687 5436.00
lO.269 5472.35
2.935 5502.53
1.798 5530.82
8.885 5578.61
8.350 5609.39
10.745 5638.47
10.023 5670.54
7.442 5700.62
11.058 5728.67
6.090 5757.04
0.609 5787.33
2.636 5811.33
3.546 5841.33
1.014 5873.17
4.269 5896.91
1.864 5925.91
1.688 5958.89
6.458 5982.39
1.629 6043.73
0.470 6068.01
2.177 6153.65
2.476 6240.70
10.452 6275.33
Continued...
3 March, 1999 - 10:39 - 4 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
133o7.1o
13336.o7
13369.o8
13399.82
13428.55
13463.20
13494.05
13523.55
13555.49
13584.13
13610.03
13646.67
13677.98
13703.97
13735.92
13796.14
13890.99
13920.88
13963.12
13993.87
14022.42
14055.39
14081.48
14112.03
142o6.14
88.460
85.080
81.76o
80.900
80.520
80.200
79.960
8o.91o
80.890
80.550
80.260
81.94o
82.500
82.850
82.950
82.76o
83.600
83.31o
82.870
84.390
88.460
94.560
96.690
97.060
94.590
Azim.
280.830
281.o5o
280.350
280.470
280.880
282.320
282.670
281.9oo
279.890
278.81o
279.18o
278.480
278.280
277.070
275.300
274.940
275.670
276.220
275.31o
273.950
272.280
271.o6o
271.25o
271.55o
271.99o
Sub-Sea
Depth
(ft)
8843.77
8845.40
8849.18
8853.81
8858.45
8864.26
8869.57
8874.47
8879.52
8884.14
8888.46
8894.13
8898.37
8901.68
8905.63
8913.12
8924.38
8927.79
8932.87
8936.28
8938.06
8937.20
8934.64
8930.98
8921.43
Vertical
Depth
(ft)
8921.27
8922.90
8926.68
8931.31
8935.95
8941.76
8947.07
8951.97
8957.02
8961.64
8965.96
8971.63
8975.87
8979.18
8983.13
8990.62
9001.88
9005.29
9010.37
9013.78
9015.56
9014.70
9012.14
9008.48
8998.93
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
4709.36 N 4583.92W 5965438.38 N 626899.32 E
4714.85 N 4612.32W 5965443.37 N 626870.83 E
4720.94 N 4644.54W 5965448.89 N 626838.52 E
4726.43 N 4674.42W 5965453.86 N 626808.54 E
4731.68 N 4702.29W 5965458.62 N 626780.59 E
4738.55 N 4735.75W 5965464.90 N 626747.01 E
4745.13 N 4765.42W 5965470.96 N 626717.23 E
4751.31 N 4793.84W 5965476.65 N 626688.70 E
4757.28 N 4824.81W 5965482.07 N 626657.63 E
4761.87 N 4852.70W 5965486.17 N 626629.67 E
4765.86 N 4877.92W 5965489.72 N 626604.38 E
4771.42 N 4913.69W 5965494.65 N 626568.52 E
4775.94 N 4944.38W 5965498.63 N 626537.75 E
4779.38 N 4969.93W 5965501.63 N 626512.15 E
4782.80 N 5001.44W 5965504.49 N 626480.58 E
4788.13 N 5060.96W 5965508.78 N 626420.98 E
4796.84 N 5154.73W 5965515.84 N 626327.07 E
4799.91 N 5184.27W 5965518.40 N 626297.48 E
4804.12 N 5225.99W 5965521.88 N 626255.69 E
4806.59 N 5256.45W 5965523.82 N 626225.20 E
4808.14 N 5284.89W 5965524.86 N 626196.73 E
4809.10 N 5317.82W 5965525.25 N 626163.79 E
4809.62 N 5343.78W 5965525.32 N 626137.83 E
4810.36 N 5374.10W 5965525.53 N 626107.50 E
4813.25 N 5467.67W 5965526.78 N 626013.89 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg Vertical
Rate Section
(°/100fi) (fi)
Comment
12.930 6305.10
11.692 6332.53
10.276 6363.59
2.824 6392.33
1.932 6419.18
4.200 6451.71
1.362 6480.78
4.123 6508.59
6.214 6538.49
3.906 6565.05
1.799 6588.98
4.958 6622.88
1.897 6651.83
4.810 6675.78
5.506 6704.92
0.672 6759.39
1.170 6845.37
2.070 6872.61
2.379 6911.03
6.615 6938.78
15.404 6964.33
18.867 6993.49
8.196 7016.36
1.555 7043.14
2.665 7126.09
Continued...
3 March, 1999 - 10:39 - 5 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Measured
Depth
(ft)
Incl.
14302.43
14394.17
14490.43
14584.o4
14677.85
14711.09
14740.43
14771.72
14861.36
14897.63
14928.1o
14954.03
15o45.31
15139.26
15231.60
15329.58
15412.27
15442.95
15477.24
15508.35
15628.00
94.990
95.210
95,610
95.110
94.930
90.520
87.69O
87.170
87.010
87.350
87.480
87.410
87.570
83.740
83.650
83.620
83.860
85.100
85,200
85,420
85.420
Azim.
272.820
273.18o
274.150
278.030
279.490
281.510
281.730
281.77o
283.370
285.030
287,190
287.200
288,290
291.46o
292.720
293.700
294,370
293.020
292,870
291.3o0
291.3oo
Sub-Sea
Depth
(ft)
8913.39
8905.23
8896.16
8887.41
8879.2O
8877.62
8878.08
8879.48
8884.03
8885.82
8887.19
8888.35
8892.35
8899.47
8909.61
8920.47
8929.49
8932.44
8935.34
8937.88
8947.43
Vertical
Depth
(ft)
8990.89
8982.73
8973.66
8964.91
8956.7O
8955.12
8955.58
8956.98
8961.53
8963.32
8964.69
8965.85
8969.85
8976.97
8987.11
8997.97
9006.99
9009.94
9012.84
9015.38
9024.93
Local Coordinates Global Coordinates
Northings Eastings Northings Eastlngs
(ft) (ft) (ft) (ft)
4817.28 N 5563.54W 5965529.13 N 625917.96 E
4822.06 N 5654.79W 5965532.31 N 625826.64 E
4828.19 N 5750.43W 5965536.76 N 625730.92 E
4838.08 N 5843.08W 5965545.02 N 625638.10 E
4852.31N 5935.44W 5965557.64 N 625545.51E
4858.36 N 5968.08W 5965563.11N 625512.77 E
4864.27 N 5996.81W 5965568.52 N 625483.94 E
4870.63 N 6027.41W 5965574.35 N 625453.23 E
4890.11 N 6114.79W 5965592.30 N 625365.53 E
4899.00 N 6149.90W 5965600.57 N 625330.26 E
4907.45 N 6179.15W 5965608.50 N 625300.87 E
4915.10 N 6203.89W 5965615.72 N 625276.00 E
4942.90 N 6290.75W 5965641.99 N 625188.67 E
4974.73 N 6378.82W 5965672.28 N 625100.05 E
5009.24 N 6463.86W 5965705.30 N 625014.42 E
5047.62 N 6553.36W 5965742.10 N 624924.27 E
5081.10 N 6628.43W 5965774.26 N 624848.62 E
5093.37 N 6656.39W 5965786.04 N 624820.45 E
5106.69 N 6687.85W 5965798.80 N 624788.76 E
5118.35 N 6716.58W 5965809.96 N 624759.83 E
5161.67 N 6827.70W 5965851.33 N 624647.97 E
Alaska State Plane Zone 4
PBU_WOA U Pad
Dogleg
Rate
(°/lOOft)
Vertical
Section
(ft)
Comment
0.954
0,459
1.o86
4.161
1.562
14,589
9,675
1.667
1.792
4,666
7.095
0.273
1.2o6
5.285
1.36o
0,995
0.856
5.960
0,524
5.079
0.0oo
7211.6o
7293.45
7379.78
7465.37
7552.82
7584.23
7612.16
7641.95
7727.64
7762.60
7792.22
7817.54
7906.86
7999.22
8090.25
8187.o6
8268.90
8299.29
8333.24
8363.99
8482.07
PROJECTED SURVEY
Continued...
3 March, 1999 - 10:39 - 6 - DrlllQuest
Sperry-Sun Drilling Services
Survey Report for U-O2APB1
Your Ref: API-500292117070
Job No. AKMW90047, Surveyed: 9 January, 1999
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_WOA U Pad
'~, All data is in feet unless otherwise stated. Directions and coordinates are relative to True' North.
!:,
);. Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 27.630° (01-Feb-99)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 299.390° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15628.00ft.,
The Bottom Hole Displacement is 8559.23ft., in the Direction of 307.089° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings Comment
(ft) (ft) (ft) (ft)
9791.54 8726.18 2403.83 N 2663.80 W TIE-ON POINT
9879.00 8803.51 2432.90 N 2692.50 W WINDOW POINT
15628.00 9024.93 5161.67 N 6827.70 W PROJECTED SURVEY
3 March, 1999 - 10:39 - 7- DrillQuest
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 9, 1999
Mr. Robert Christenson
Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
Re: Request to Commingle Test Production from S;200:~nd W-200 Wells
Dear Chairman Christenson:
As you are aware, BP as PBU WOA Operator on behalf of the lease owners, has drilled two
Schrader test wells in the PBU WOA and requested approval of a Pilot Production Plan. S-200
(aka SB-01) bottomed on T12N-R12E UM Sec. 27 within ARCO/Exxon lease ADL 28258. W-
200 (aka SB-02) bottomed on Sec. T11N-R12E Sec. 21 within Mobil/Phillips/Chevron lease ADL
28263. Both wells have been briefly tested from various Schrader Bluff formation intervals, but
additional appraisal completion or testing work remains to be performed before the pilot period.
Both wells will be completed in the Schrader Bluff formation, no approval is requested for
downhole commingling with formations other than the Schrader Bluff. The wellwork is expected
to be performed in September and October 1999. Production testing is not expected to exceed
seven days per well.
Consistent with existing practices, BP requests approval by the AOGCC on behalf of
ARCO/Exxon and Mobil/Phillips/Chevron to commingle production with other pools for
processing at PBU Gathering Center 2 during the testing period. Production allocation will be
based on the existing well test methodology approved by the AOGCC, based on well tests
conducted at S and W pads. Similar approval was granted by letter of 12/18/97. BPX will
undertake to advise the Division of the status of well operations in a timely manner.
If you have any questions, please contact Steve Deckert at (907) 564-4128.
Sincerely,
Central North Slope- Western Developments
CC:
K. Boyd - Department of Natural Resources
M. Evans - Exxon Company, U.S.A.
W. Fennell- Chevron U.S.A., Inc.
J. Hollier- Mobil Exploration & Production U.S., Inc.
J. Johnson - Phillips Petroleum Company
J. Pilkington - Department of Revenue
G. Pospisil - ARCQ Alaska, Inc.
0 F! I L_I_I IMr= SEFtL/I C: E S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Loft Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs U-02A & U-02A PB 1
September 9, 1999
AK-MW-90047
U-02A:
2"x 5" MD Resistivity & Gamma Ray Logs:
50-029-21170-01
2" x 5" TVD Resistivity & Gamma Ray Logs:
50-029-21170-01
U.-02A PB1:
2"x 5" MD Resistivity & Gamma Ray Logs:
50-029-21170-70
2"x 5" TVD Resistivity & Gamma Ray Logs:
50-029-21170-70
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMYI~AL LETFER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Ali Turker
5631 Silverado Way, Suite G.
Anchorage, Alaska:._.` 9?.518
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
WELL LOG-TRANSMITT~
To:
State of Alaska August 31, 1999
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs U-02A & U-02A PB 1 AK-MW-90047
2 LDWG formatted Disks with verification listing.
APl#: 50-029-21170-01 & 50-029-21170-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITFAL LEITER TO THE ATFENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
5631 Silverado Way, Suite G.
Anchorage, Alaska 99518
.
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date:
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
d
rv ces
rilling
To:
Mr. Blair Wondzell, AOGCC
From: Jim Smith, SSD
Date: $anuary 12, 1999
Subject:
"Gunk" Squeeze for Lost Returns
Well U-02A from rig Nabors 9ES is presently horizontal at 15,568'MD in the Ivishak formation, drilling has been
halted due to excessive loss of returns to an expected fault which was crossed. At the current time, concentrated pills
of LCM has not proved effective in halting losses.
SSD plans to pump one or two more pills of highly concentrated LCM in efforts to stop the loss of seawater which is
our fluid presently in the hole. Subsequent to these pills we propose to pump a "Gunk" squeeze composed of mineral
oil and 300-400 #Pobl of bemonite gel. When the gel mixes with available water a reD' thick product is generated
which has proved able to seal loss zones in the past,
SSD has available a stockpile of the Conoco LVT-200 mineral oil which was previously used as drilling mud on the
13-02B well last year in efforts to control running Kingak shales. As opposed to purchasing new mineral oil we plan
to use part of this existing stock of mineral oil in the "gunk" squeeze which is planned.
Your acceptance of this proposal is requested.
Regards,
SSD SDE
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Bob Christenson,I~ DATE: January 31, 1999
Chairman
THRU: Blair Wondzell, d'~~ FILE NO: AISJA5GF. DOC
P. I. Supervisor ~/3 Iq'~
Lou Grimaldi,~o.~
Petroleum InslSector
FROM: SUBJECT:
BOP Test, Nabors #9ES
BPX U-02
Prudhoe Bay Unit
98-0239
Non-Confidential
Sunday, January 31, 1999; I witnessed a weekly BOP test on Nabors rig #9ES drilling
BPX well #U-02 in the Prudhoe Bay field.
The rig was ready to test within a hour of when I arrived. The stack was filled with the
only available water on board, which was quite hot. This was in anticipation of building
mud for the new section of hole to be drilled. I questioned the use of such warm fluid for
testing, as this was the only water available at the time I allowed for the test to begin.
The warm fluid gave us much problems by contracting as it cooled in the stack showing
a pressure decline during each separate test. I requested that we change fluid, the only
other suitable fluid was the mud in the trip tank. Normally, mud is not used due its
compressibility and possible sealing of slight leaks, in light of this rigs short but good
record I allowed for the mud to be used but held the tests slightly longer than I normally
would. I mentioned to Lee Martin (Toolpusher) that in the future it would be required to
have water at ambient temperature for test fluid.
The test was restarted and all BOPE functioned properly and held its respective
pressure tests. With the exception of the warm fluid problem, the test proceeded
smoothly and showed this rig to be in good shape for finishing this well.
SUMMARY: I witnessed the weekly BOP test on Nabors 9ES, No failures observed.
Attachments: AISJA5GF.XLS
cc; Bill Issacson (ODE Shared Services drilling)
NON-CONFIDENTIAL
Nabors 9ES '~ ....
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor: Nabors
Operator: BPX
Well Name: U-02A
Casing Size:
Test: Initial
Workover: DATE:
Rig No. 9 PTD # 98-239 Rig Ph.#
Rep.: Kirk White
Set ~
Weekly X Other
11/8/98
659-4103
Rig Rep.: Lee Martin/Jim Gaffney
Location: Sec. 18 T. 11N R. 13E
Umiat:
TEST DATA
MISC. INSPECTIONS:
Location Gen.: P
Housekeeping: P (Gen)
PTD On Location P
Standing Order Posted P
Well Sign P
Drl. Rig P
Hazard Sec. P
BOP STACK: Quan.
Annular Preventer 1
Pipe Rams 1
Lower Pipe Rams 1
Blind Rams 1
Choke Ln. Valves
HCR Valves 2
Kill Line Valves 1
Check Valve
Test Press. P/F
250/2500 P
250/5,000
FLOOR SAFETY VALVES:
Upper Kelly/IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Test
Ouan. Pressure
I 250/5,000
1
1
I Functioned
P/F
P
P
P
P
Test
CHOKE MANIFOLD: Pressure
No. Valves 14 250/5,000
No. Flanges 32
Manual Chokes .__~1 IFunct oned
I
Hydraulic Chokes 1
P/F
P
P
ACCUMULATOR SYSTEM:
System Pressure 2,900 I
Pressure After Closure 1,750
I
MUD SYSTEM: Visual Alarm 200 psi Attained After Closure mln'S 30 sec.
Trip Tank P P System Pressure Attained 2 rain's 2o sec.
Pit Level Indicators P I~ Blind Switch Covers: Master: P Remo---'0"t~ P
Flow Indicator I~ P Nitgn. Btl's: Four Bottles at 2200 ~
Meth Gas Detector P P
H2S Gas Detector P P
TEST RESULTS
Number of Failures: ,Test Time: 3.0 Hours. Numl3er of valves test 20 Repair or replacement of Failed
Equipment will be made within N/A days. Notify the Inspector and follow with Written or Faxed verification to
the A0OCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: Good test, Check and log N2 precharge in accumulator bottles after pad moves and monthly.
Distribution: STATE WITNESS REQUIRED7
odg-Well File YES X NO
c - Oper./Rig 24 HOUR
c - Database NOTICE GIVEN
c - Trip Rpt File YES X NO
c- Inspector
Waived By:
Witnessed By:
Lou Grimaldi
Page 1
BP EXPLORATION
BASED ON
ENGINEERING DATA
ENGINEER
BUDGET/AFE NO.
SHEET NO. / OF ~
DEPT. APP'VL DATE. FILE NO.
AK 2337-'~ (3/g4)
BP EXPLORATION
To:
From;
Subject:
Blair Wondzell AOGCC
Bob Kaluza, ODE, SSD MB 8-1
U-02A, Possible Second Sidetrack
Date: January 20, 1999
U-02A was planned as a 7,000' extended horizontal undulating sidetrack, drilling to two (2) Zone 4 targets.
The well was kicked out of 7 "casing at _ 9,900' MD in the Sag River formation and directionally drilled
through Z4 Target #1 at _+ 11,800' MD. Four (4) faults were crossed through Target #1 without any hole
problems. The well was then turned 60° WNW and directionally drilled through Z4 Target #2 crossing four
(4) additional non-troublesome faults. At ± 15,568' MD massive loss circulation occurred when fault ,f9 was
encountered; static fluid losses to the fault were as high as 200 bbl/hr (the rig switched from FIo-Pro mud to
filling the hole with 8.4 ppg seawater). Three large MI Kwikseal/Coarse Nut Plug LCM pills were pumped into
the fault where static losses decreased to 4 - 5 bbl/hr. Fault #9 was then drilled across to 15,628' MD where
static loss circulation dramatically increased to as high as 400 bbl/hr. When drilling the fault, the Nabors 9ES
driller described that he drilled through a void for about 5 feet. Three more coarse mix, 120 ppb/100bbl
Kwlkseal/NutPlug pills were mixed and pumped to slow the loss circulation. Static losses again slowed to
< 20 bbl/hr to the fault. The fault was then penetrated a second time and massive loss circulation occurred
again; as high as 400 bbl/hr. The BHA was changed to allow for larger and more diverse LCM pills to be
pumped. One 50 bbl Iow compressive strength cement pill and two (2) more high density Kwikseal/Nutplug
pills were pumped to the fault with no positive effect. The fault took every type of LCM pill and continued to
take seawater from the wellbore at 100 - 200 bbl/hr static.
Because the fault could not be effectively sealed, hole cleaning while circulating the drill string was very
ineffective. Full circulation and good hole cleaning could not be achieved after fault ~9 was penetrated. The
wellbore was not completely clean of drilling cuttings and had LCM material throughout.
After the cement LCM pill and final two (2) high density Kwikseal/Nutplug was pumped, the drill string was
pulled out of the hole. At + 14,000' MD the hole started to get sticky and acted as if the hole was packing off.
Circulation could no longer be achieved (due to losses to the fault and due to packing off) but the drill string
could be rotated and could still be pulled out of the hole. At 12, 745' MD the drill stdng could no longer be
pulled out of the hole and became stuck.
The drill pipe was backed off at _+ 10,900' and a jarring assembly RIH. The 1,845' fish was jarred up hole 60'
but could not be completely recovered.
Fishing operations continue today. I} the fish is not recovered soon, the fishing assembly will be backed off, a
cement plug will have to be set on top of the fish and a new Z4 wellbore will have to be ddlled. Drilling will
stop prior to encountering fault #9 with the next directional plan.
In the event that a second sidetrack wellbore will be needed to complete this well, a complete Sundry Permit
· will be submitted.
Prepared by:
Drilling EnginEer ~ Date
CC:
Tony Bunch
Dan Stone
Jim Smith
MB 8-1
MB8-1
MB 8-1
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
November 25, 1998
James E. Smith
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
ac:
Prudhoe Bay Unit U-02A
ARCO Alaska, Inc,.
Permit No: 98-239
Sur Loc: 237'NSL, 2434'WEL, Sec. 18, T1 iN, R13E, UM
Btmhole Loc. 4990'NSL, 4367'WEL, Sec. 13, T11N, R12E, UM
Dear Mr. Smith:
Enclosed is the approved revised application for permit to drill the above referenced well. The
revision is fora change in bottom-hole location.
The provisions of the original approved permit dated November 25, 1998, are in effect for this
revision. ~
Commissioner
BY ORDER OF THE COMMISSION
dlffEnclosurcs
CC:
Department of Fish & Game, Habitat Section W/o encl
Department of Environmental Conservation w/o encl
STATE OF ALASKA
ALASKA'~IL AND GAS CONSERVATION COk.~.,llSSlON
PERMIT TO DRILL
20 AAC 25.005 Revised: 01/25/99
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 77.5' Prudhoe Bay Field / Prudhoe
3. Address 16. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047451
:4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
237' NSL, 2434' WEL, SEC. 18, T11 N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
3096' NSL, 306' WEL, SEC. 13, T11N, R12E, UM U-02A
At total depth 9. Approximate spud date Amount $200,000.00
4990' NSL, 4367' WEL, SEC. 13, T11N, R12E, UM 01/24/99
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028260, 290'I No Close Approach 2560 15213' MD /8925' TVDss
16. To be completed for deviated wells 17. Anticipated pressure [see 20 AAC 25.035 (e) (2)}
Kick Off Depth 10390' MD Maximum Hole Angle 100° Maximum surface 2470 psig, At total depth tTVD) 8800'/3350 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
6" 4-1/2" 12.6# L-80 IBT-M 5473' 9740' 8599' 15213' 8925' 803 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: truemeasuredvertical 103479210 feetfeet Plugs(measured) 0 ~, I G i I,~ kL
Effective depth' measured 10182 feet Junk (measured) Fill at 10182'
true vertical 9069 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds concrete 145' 145'
Surface 2645' 13-3/8" 3255 cu ft PF 'E', 465 cu ft PF II 2680' 2680'
Intermediate 9836' 9-5/8" 2380 cu ft Class 'G' 9871' 8804'
Production
Liner 741' 7" 270 cuff Class 'G'~.~~¢~E~ ~'I 9~6~6'.-~r6~ ~.~.-~t0345' 8578' - 9210'
Scab Liner 6639' 7" 1028 cu ft Class 'G' ~\. ..... 604' 2965' - 8578'
Perforation depth: measured None dAN 2b ~999
true vertical None ,¢daska 0il & Gas Cons. O0mfflissi0r,
Anch0ra.~a
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid___/.,.~Pr~Ep~ []/Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
/' ,/// /
21. I hereby certify that the/oregoj~ is trj~ an~c~eCto the best of my knowledge . /
Signed //(~ ,/¢'. ~/-~-~' ///./'_ ' / -/
m~t ~ / ~' '~' / ~
James E.S'h ~' ~'"~~-:'.._~/'~(//~"~ Title Senior Drilling Engineer Date ///~ // ¢ ~"
* - .... ' ~h Commission Use Only /
Permit Number J APINumber //Appr°val Date____ ~ I See cover letter
q~.~..~'~ 50-029-21170 --o / --- ¢,1¢~- 'r~ for other
requirements
Conditions of Approval: Samples Required []Yes/'~]No Mud Log Required []Yes [~No
Hydrogen Sulfide Measures .J~Yes [] No Directional Survey Re..q.uired [~Yes [] No
Required Working Pressure for BOPE []2K; 1--13K; 1--14K; ~ []10K; I--I15K
Other: Original Si~ncd By
" by order of
Approved ay David W. Johnston Commissioner the commission Date//--,,~-. ¢~
Form 10-401 Rev. 12-01-85 Submit In Triplicate
l Well Name: I u-02A
Well Plan Summary
l Type of Well (producer or injector): I Producer ]
Surface Location: 237' FSL, 2434' FEL, Sec. 18, TllN, R13E
Kick Off Point:
Target #1:
Geological
Target #2:
Geological
Target #3:
Geological
Target #4:
Geological
Target #5 End:
X = 631,565 Y= 5,960,810
3096' FSL, 306' FEL, Sec. 13, T1 iN, R12E
X = 628,695 Y = 5,963,620 Z = 8901' TVDss
4165' FSL, 1168' FEL, Sec. 13, TllN, R12E
X = 627,815 Y = 5,964,675 Z = 8,845' TVDss
4614' FSL, 1995' FEL, Sec. 13, T1 IN, R12E
X = 626,980 Y = 5,965,110 Z = 8,938' TVDss
4862' FSL, 2435' FEL, Sec. 13, T1 iN, R12E
X = 626,536 Y = 5,965,350 Z = 8,870' TVDss
4859' FSL, 3451' FEL, Sec. 13, T1 IN, R12E
X = 625,520 Y = 5,965,330 Z = 8,956' TVDss
4990' FSL, 4367' FEL, Sec. 13, T1 IN, R12E
X = 624,602 Y = 5,965,446 Z = 8,925' TVDss
I AFE Number: 14P1078
I Rig: I Nabors 9ES
Operating days to
complete:
I TVOss: 18,925' I
IEstimated Start Date: I 1/24/99
IUD 115,213' I
17
I KBE: 177.5'
IWell Design (conventional, slim hole,
etc.):
Extended Horizontal Sidetrack
Objective:
Kick off cement plug in ZA at 10,390', directionally drill 6" hole thru (1)
Z4 target, TD at 15,213' MD. Run, cmt and test 4 1/2" solid liner,
complete with 4 ~/-''
y2 , L-80 tbg, (6) GLM's and WOA tail assy.
Formation Markers
Formation Tops MD TVD(ss)
Original wellbore 9,890' 8,731' Sidetrack from Whipstock out of 7 "liner
sidetrack into Sag River formation.
TShublik 9,906' 8,745'
TSAD 10,046' 8,841'
TZ4 10,046' 8,841'
Target Start; KOP 10,390' 8,881' KO cement plug after Geologic Plugback
TD - Target 15,213' 8,925' Undulating thru Z4 target
HO/T 8,984'
OOWC 9,004'
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg MDfYVD MDfrVD
O.D.
6" 4 1/2" 12.6# L-80 IBT 5,473' 9,740'/8,599' 15,213'/8,925'
liner Mod
4 V2" 12.6# L-80 IBT 9,710' 30'/30' 9,740'/8,599'
compl. Mod
Logging Program:
Open Hole Logs:
[Cased Hole Logs
Drilling section: MWD/GR from KOP (10,390') bit exhaustion.
MWD/GR/Res to TD at 15,213' MD.
MADD pass as per Geologist request.
DPC Platform Express + Sonic will be run after reaching TD.
Sample catchers and rig site geologist on site before drill out of
window.
None
Mud Program:
Special design
considerations
IAll of Z4 to TD with MI Flo-Pro Polymer system.
The formulation of the brine phase will be 6% KCL.
Density LS R V P V Gels Chlo ri des p H
(ppg) (cps)
8.7 55 ~ 60,000 < 15 10 sec. >18 30,000 9.0-9.5
to to expect to to
8.9 55 - 60,000 8-12 10 min. >20 30,000 9.0-9.5
Record LSRV at 1,2,3 minutes: Make certain they are elevated and fiat.
Plan to run 3-5 % Lubetex by volume. Start 6", Z4 section at 3 %
Sweeps, Liner slugs and CBU sweeps at 150,000 cp w/60-80 rpm & reciprocation the full 90'.
Ensure good stocks of LCM on location.
Directional:
KOP:
1) 10,390' MD, kick offcmt plug, steer to 319° azimuth and
85° inclination, TD (15,213') well at 278° azimuth and 92°
inclination. Will make three small azimuth tums to TD and
will drill (2) undulations thru ZA to TD.
Maximum Hole Angle:
Surface Shut-in
Close Approach Well:
Point to point separation
100° undulating thru Z4
None, due to Geologic Plugback and
Kickoff.
There are no close approach wells to this
new wellbore identified by Sperry Sun.
Cement Data:
Casing/Liner Lead: Tail: Sxs/Wt~ield Comments
Sxs/Wt/Yield
P&A of original well 127/15.8/1.15 Class "G", TOC 9,750'
432' + 10 bbl 135' above top perfs.
4 V2", 12.6#, L-80 liner 603/15.8/1.15 Class "G", 50% excess
OH
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and
annular preventer will be installed and is capable of handling maximum potential
surface pressures.
Diverter and BOPE system schematics on file with AOGCC.
Bottom hole pressure is 3,350 psi at 8,800 TVDss through targe.
Maximum shut-in casing pressure is 2,470 psi (assumes 0.1 psi/ft gas gradient to
surface).
NO ANNULAR INJECTION IN THIS WELL.
U-02A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes
are generated, they will be taken to Pad 3 disposal site.
Contacts
Name Office Home Pager
Bob Kaluza Drilling Eng. 564-5344 563 9059 275-1014
Tony Bunch Drilling Supt. 564-5219 229-0729 275-3703
Bob Metzger Geologist 564 4613 345 2592 223 7187
Daniel Hsi Pad Engr. 564 4513 345 5982 227 0439
Bruce Smith Asset Drilling Eng. 564 5173 345 2948 275 4600
Stuart Montaque Geophysicist 564 4029 561 9500 230 6335
Drilling Discussion
Well Objective
The NW fault block of the U - Pad has 129 million reservoir bbls total pore volume, of which
approximately 107 million (83%) will be under flood. U-02A is a critical well for flood and MI
development, and will be a 5,300' undulating Z4B producer receiving support from three injectors.
This well will capture the reserves associated with current producers U-12 (presently P&A'd for
sidetrack) and U-02, as well as the undrained region in the western most part of the U pad. The
unrisked incremental reserves are 6.02 mmstb.
The expected average first year incremental oil rate is 2645 bopd at 60% WCUT and 699 scf/stb GOR.
Drilling Objective Original Wellbore
The drilling objective was to pull the existing 4 ½" x 3 ½" tubing, mill up and retrieve the existing
production packer, dress the P & A cement plug to just below the Sag River perforations, set a
whipstock and mill through 7' liner casing into the Sag River formation. Directionally drill this 7,000'
undulating extended horizontal sidetrack through two Z4B targets to TD at 16,863'. Run, cement and
test 4 ½" liner, perforate and complete with 4 ½" tubing.
After the decompletion phase was successfully completed, the well was kicked off into the Sag River
formation, successfully steered into and through the first Z4 target and into Z4 target 4/2. Eight faults
were drilled without incident. At 15,568' MD, fault gO was encountered where massive lost circulation
losses were incurred ( as high as 400 bbl/hr). Eleven (11) LCM pills of various sizes and properties
were pumped to the fault to seal off the fault. None worked effectively. Because the fault took so much
fluid, full circulation and good hole cleaning could never be achieved. After LCM pill 4/ 11 was
pumped the drill string was POOH. At 12,745' MD, the DP became stuck and had to be severed (top of
fish 11,014'). A cement plug was set and dressed down to 10,390' where a second EHST (extended
horizontal sidetrack) will be drilled out of the original wellbore.
Drilling Objective Sidetrack Wellbore
The new Z4 wellbore will be drilled from KOP at 10,390' to TD at 15,312' MD. The well will have
two undulations (@ 1,300' in length each) through one Z4 target.
No large faults are predicted but (10) small faults will occur with the potential for fluid loss. Several
small faults (10'-35') have been interpreted, but poor data quality precludes correlation of these faults
laterally for any significant mapable extent.
The designed well path optimizes structural position and reservoir exposure with undulations that will
be geosteered using MWD/GR/Res (real time). The criteria for geosteering are approximately 20'
standoff from the HOT and ensuring the wavelength of the undulation is targeted at 1400 feet or less.
The well will be completed as a Zone 4B producer with a 4 ½", L-80, 12.64/tubing, (6) GLM's and
WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation.
DRILLING HAZARDS AND CONTINGENCIES
Always have two levels of tested isolation before NU/ND.
SURFACE CLOSE APPROACH WELL SHUT-INS
There is no well that will need to be shut-in during the rig move on and off of the well. Careful
coordination with any ongoing pad or facility operations or activities will be initiated prior to
commencing the rig move.
DRILLING CLOSE APPROACH WELL SHUT-INS
No shut-ins identified on Sperry Sun directional well plan due to close approach requirements.
PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.4 ppg
EMW and the Sadlerochit is expected to be near 7.4 ppg. 8.7 - 8.8 ppg mud will be used drilling
the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the
reservoir pressure.
HOLE PROBLEMS
The well's design cuts 10 small faults in the reservoir section, however only (1) of the faults are large
enough and areally extensive to be mapped. Be prepared for the possibility of lost circulation. The
original wellbore, U-02, did not experience lost circulation. Other wells in the intermediate vicinity
have experienced minor lost circulation. The original wellbore, U-02A, experienced massive loss
circulation to fault 4/9.
No major conductive faults have been identified and no major hole problems are expected.
H~S: U-Pad is not an H2S Pad
There are no reported incidents of H2S at well U-02. H2S precautions will be in effect at all times.
These include (but are not limited to):
· Regular H2S drills (minimum of two per week)
· Proper training of all permanent onsite personnel, unescorted visitors and temporary
onsite personnel;
· H2S monitors with both audible and visual alarms;
· Access to 5-minute emergency escape air packs;
· Personal H2S monitors;
· Functional wind indicator;
· Posted evacuation routes (minimum of two);
· Muster points in designated safe areas;I-Ig.S;
--
· Functional communications between rig camp and rig floor.
Fault Evaluation
See Hole Problems. The original wellbore, U-02A, experienced massive lost circulation. Other
wells in the immediate vicinity have experienced lost circulation: U-03, U-11, U-13, U-14, H-
10, H-12, and H-32.
Casing Shoe Kick Tolerance
The smallest kick tolerance for the 9 5/8" casing shoe is calculated as infinite of influx assuming a
swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg
MW (TSAG 9,883' MD & 8,725' TVDss, 7.8 ppg reservoir pore pressure), and min. frac at shoe of
12.0 ppg.
SUMMARY PROCEDURE
Rig Sidetrack Procedure
1. Set 17 ppg cement plug on top of severed fish (top at 11,014'), dress down to 10,390'
2. Kick-off and directionally drill 6" hole to 15,312' TD.
3. Run DPC log suite at TD.
4. Run and cement 4 V2", L-80 solid production liner (cement behind the entire liner).
5. Perforate DPC
6. Run 4 V2", L-80 tubing completion.
7. ND BOPE, NU and test tree. RDMO.
TREE: 4" CIW - 5M - McEvoy
WELLHEAD: 13 5/8" - 5M - McEvoy
ACTUATOR: OTIS
)
U -O2A
133/8" 72# L-80 BTR8
26801
7" TIW 8-6 Top Packer
2,9651
41/2", 12.6#/ft, L-80
TUBING ID: 3.958"
CAPACITY: 0.0152 BBUFT
7",26# , L-80, TC48 8cab Liner
7" BAKER TIEBACK
RECEPTACLE
916061
9 5/8" 47# L-80 BTR8 I
9,8681
Window
9,9001
Whipstock @ 9,915' MD
PERFORATION SUMMARY
REF LOG: SWS - BHCS11-14-86
SIZE SPF INTERVAL OPEN/SOZ'D
FISH: 2" x 7" Bullnose from Perf Gun I
I
I
10,1821
10,3031
10,3451
I
I
]
.
')
KB. ELEV = 77.46
BF. ELEV = 30.00
SSSV LANDING NIPPLE
(OTIS) (3.813" ID)
20821
GAS LIFT MANDRELS
CAMCO w/ RK ATCH)
NS! MD(BKB) TVDss
1
2
3
4
5
6
4-1/2" X Nipple @ 9,680' MD
7" Production Packer @ 9,690' MD
4-1/2" X Nipple @ 9,724' MD
4-1/2" XN Nipple @ 9,735' MD
4-1/2" Liner Top @ 9,740' MD
. .
Geologic Plugback of Sidetrack #1.
KOP: 10,390' Sidetrack #2
MAX ANGLE: 1000 @ 12,900' MD
4-1/2" 12.6# L-80 1ST-mod Liner
TD @ 15,213' MD
PBTD @ 15,133' MD
All Perforations Plugged
durino Pre-Rio work
PBTD
~~
7", 29# L-80 IJ4S
DATE
-
9-8-84
COMMENTS
INITIAL COMPLETION
REV. BY
8-22-90
POST 1990 WORKOVER
LGM
4-9-92
9-3-94
A.TEEL
J. Attid
Tubing Patch over GLM #6
REVISED
BP
PRUDHOE BAY UNIT
WELL: U-02A 42-13-11-12
API NO: 50-029-21170
SEC 18: TN 11N: RGE 13E
Exploration (Alaska)
SHARED SERVICES DRILLING
WELL ' U-02A Wp6
I DrillQues. t'
Proposal Data for U-02A Wp6
Vertical Origin: Well
Horizontal Origin: Well
Measurement Units: tt
North Reference: True North
Dogleg severity- Degrees per 100it
Vertical Section ~zimuth: 299.390°
Vertical Section Description:Well
Vertical Section Origin: 0.00 N,0.00 E
Measured IncJ. Azirm Vertical Northings Eastings Vertical Dogleg
Depth Depth Section Rate
10400.00 85.248 352.658 8977.94 2859.94 N 2820.66 W 3861.16
10440.00 82.685 349.570 8982.15 2899.23 N 2826.80 W 3885.79 10.000
I0757.20 94.853 318.500 8989.12 3180.26 N 2963.87 W 4143.14 10.500
11559.76 94.853 318.500 8921.23 3779.19 N 3493.76 W 4898.76 0.000
11802.28 85.000 299.000 8921.54 3930.07 N 3681.75 W 5136.60 9.000
11817.85 83.723 298.419 8923.07 3937.52 N 3695.35 W 5152.10 9.000
12633.41 83.723 298.419 9012.25 4323.33 N 4408.32 W 5962.65 0.000
12748.95 94.000 300.000 9014.54 4379.62 N 4509.01 W 6078.00 9.000
12812.02 99.525 301.314 9007.12 4411.54 N 4562.86 W 6140.59 9.000
13095.71 99.525 301.314 8960.17 4556.95 N 4801.89 W 6420.21 0.000
13259.58 90.000 290.000 8946.54 4627.36 N 4948.74 W 6582.72 9.000
13540.40 83.670 265.481 8962.28 4665.00 N 5224.28 W 6841.27 9.000
14118.77 83.670 265.481 9026.04 4619.71 N 5797.34 W 7318.35 0.000
14287.07 91.919 278.205 9032.54 4625.15 bi 5964.93 W 7467.04 9.000
15212.89 91.919 278.205 9001.54 4757.21 N 6880.76 W 8329.81 0.000
SURFACE LOCATION
Horizontal Coordinates: 5960810.00 N, 631565.00 E
RKB Elevation:
76.54 ff RKB- AMSL
NAD27/Uaska State manes,
Coordinate System: Zone 4. US Foot
Sinqle Well Tarqet Data for U-02A RiqWps
PLOT DATE'
Created By:
Checked By: ~
22-Jan-9
Target
Name
ff
Coordinate
Point
' U-02A Wp6 Polygon
Entt7 l~int
Boundary Point A
C
D
£
F
G
H
I
$
TVD-RKB
U-02A Wp6 TI Entry Point 8921.54 8845.00
U-O2A Wp6 T'2 Entxy Point 9014.54 8938.00
U-O2A Wp6 T3 Entry Point 8946.54 .8870.00
U.4)2A Wp6 T4 Entry Point 9032.54 8956.00
U-O2A WD6 T5 Enu7 Point 9001.54 8925.00
TVD-SS Northings Eastings Northing$
2266.82 N 2882.75 W 5963026.00 N
2266.82 N 2882.75 W 5963026.00 N
2253.59 N 2583.94 W 5963018.00 N
3138.01 N 2714.47 W 5963900.00 N
4008.27 N 3464.35 W 5964~57.00 N
4330.75 N 4002.78 W 5965070.00 N
4693'.54 N 5015.59 W 5965415.00 N
4934.92 N 6919.65 W 5965623.00 N
4551.71 N 6911.36 W 5965240.00 N
4496.76 N 5087.04 W 5965217.00 N
4060.64 N 4284.56 W 5964795.00 N
3559.30 N 3641.24 W 5964305.00 N
3930.07 N 3681.75 W 5964675.00 N
4379.62 N 4509.01 W 5965110.{30 N
4627.36 N 4948.74 W 5965350.00 N
4625. ! 5 N 5964.93 W 5965330.00 N
4757.21 N 6880.76 W 5965446.00 N
Fastings Target
Shape
628643.00 E Polygon
628643.00 E
628942.00 £
628796.00 E ,'
62803 i .00 E ~,
627487.00 E
626468.00 E
624560.00 E
624575.00 E
626400.00 E
627210.00 £
627862.00 E
627815.00 E Point
626980.00 E Point
626536.00 £ Point
625520.00 E Point
624602.00 E Point
8400 -
1::: :7- 910o -
O
U-O2A Wp6 TI U-O2A Wp6 T2 8946.54 TVD
8921.54 TVD 9014.54 TVD 4627.36 N, 4948.74 W 9032.54 TVD ' 9001.54 TVD
3930.07 N, 3681.75 W 4379.62 N, 4509.01 W 4625.15 N, 5964.93 W 4757.21 N, 6880.76 W
3500 4200 4900 5600 6300 7000 7700 8400
Scale: I inch = 700ft
Vertical Section
Section Azimuth: 299.390° (True North)
Sperry-Sun Drilling Services
Proposal Report for U-O2A RigWps - U-O2A Wp6
Revised: 22 January, 1999
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth Northings
(ft) (ft) (ft) (ft)
10400.00 85.248 352.658 8901.40 8977.94 2859.94 N
10440.00 82.685 349.570 8905.61 8982.15 2899.23 N
10500.00 84.930 343.648 8912.08 8988.62 2957.23 N
10600.00 88.777 333.862 8917.58 8994.12 3050.16 N
10700.00 92.659 324.103 8916.33 8992.87 3135.73 N
10757.20 94.853 318.500 8912.58 8989.12 3180.26 N
10800.00 94.853 318.500 8908.96 8985.50 3212.20 N
10900.00 94.853 318.500 8900.50 8977.04 3286.83 N
11000.00 94.853 318.500 8892.04 8968.58 3361.45 N
11100.00 94.853 318.500 8883.58 8960.12 3436.08 N
11200.00 94.853 318.500 8875.12 8951.66 3510.71 N
11300.00 94.853 318.500 8866.66 8943.20 3585.33 N
11400.00 94.853 318.500 8858.20 8934.74 3659.96 N
11500.00 94.853 318.500 8849.74 8926.28 3734.59 N
11559.76 94.853 318.500 8844.69 8921.23 3779.19 N
11600.00 93.226 315.256 8841.85 8918.39 3808.48 N
11700.00 89.151 307.228 8839.77 8916.31 3874.32 N
11800.00 85.092 299.184 8844.80 8921.34 3928.97 N
11802.28 85.000 299.000 8845.00 8921.54 3930.07 N
11817.85 83.723 298.419 8846.53 8923.07 3937.52 N
11900.00 83.723 298.419 8855.51 8932.05 3976.38 N
12000.00 83.723 298.419 8866.45 8942.99 4023.68 N
12100.00 83.723 298.419 8877.38 8953.92 4070.99 N
12200.00 83.723 298.419 8888.32 8964.86 4118.30 N
12300.00 83.723 298.419 8899.25 8975.79 4165.60 N
Local Coordinates
Global Coordinates Dogleg Vertical
Eastings Northings Eastings Rate Section
(fi) (fi) (fi) (°/100fi) (fi)
2820.66 W 5963620.11 N 628694.70 E 3861.16
2826.80 W 5963659.29 N 628687.87 E 10.000 3885.79
2840.61 W 5963717.04 N 628673.04 E 10.500 3926.29
2876.76 W 5963809.32 N 628635.28 E 10.500 4003.39
2928.21 W 5963893.98 N 628582.34 E 10.500 4090.21
2963.87 W 5963937.88 N 628545.90 E 10.500 4143.14
2992.13 W 5963969.32 N 628517.08 E 0.000 4183.44
3058.16 W 5964042.78 N 628449.76 E 0.000 4277.59
3124.18 W 5964116.24 N 628382.44 E 0.000 4371.74
3190.21 W 5964189.69 N 628315.12 E 0.000 4465.89
3256.23 W 5964263.15 N 628247.80 E 0.000 4560.04
3322.26 W 5964336.61 N 628180.48 E 0.000 4654.19
3388.28 W 5964410.07 N 628113.15 E 0.000 4748.34
3454.31 W 5964483.53 N 628045.83 E 0.000 4842.49
3493.76 W 5964527.43 N 628005.60 E 0.000 4898.76
3521.20 W 5964556.24 N 627977.66 E 9.000 4937.03
3596.30 W 5964620.75 N 627901.42 E 9.000 5034.78
3679.77 W 5964673.93 N 627817.00 E 9.000 5134.33
3681.75 W 5964675.00 N 627815.00 E 9.000 . 5136.60
3695.35 W 5964682.21 N 627801.27 E 9.000 5152.10
3767.16 W 5964719.81 N 627728.79 E 0.000 5233.74
3854.58 W 5964765.57 N 627640.56 E 0.000 5333.13
3942.00 W 5964811.34 N 627552.32 E 0.000 5432.51
4029.43 W 5964857.11 N 627464.08 E 0.000 5531.90
4116.85 W 5964902.88 N 627375.85 E 0.000 5631.28
Alaska State Plane Zone 4
PBU_WOA U Pad
Comment
KOP: Start Dir @ 10°/100ft: 10400.00ft MD, 8977.94ft TVD
Start Dir @ 10.500°/100ff: 10440.00ft MD, 8982.15ft TVD
End Dir: 10757.20ft MD, 8989.12ft 'I'VD
Start Dir @ 9.000°/100ff: 11559.76ft MD, 8921.23ft TVD
Target - U-02A Wp6 T1, Geological
End Dir: 11817.85ft MD, 8923.07ft TVD
Continued...
22 January, 1999- 15:36 - 1 - DrillQuest
Prudhoe Bay Unit
Measured Sub-Sea Vedical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
12400.00 83.723 298.419 8910.18 8986.72
12500.00 83.723 298.419 8921.12 8997.66
12600.00 83.723 298.419 8932.05 9008.59
12633.41 83.723 298.419 8935.71 9012.25
12700.00 89.646 299.331 8939.56 9016.10
12748.95 94.000 300.000 8938.00 9014.54
12800.00 98.472 301.061 8932.46 9009.00
12812.02 99.525 301.314 8930.58 9007.12
12900.00 99.525 301.314 8916.02 8992.56
13000.00 99.525 301.314 8899.47 8976.01
13095.71 99.525 301.314 8883.63 8960.17
13100.00 99.278 301.012 8882.93 8959~7
13200.00 93.482 294.080 8871.81 8948.35
13259.58 90.000 290.000 8870.00 8946.54
13300.00 89.061 286.486 8870.33 8946.87
13400.00 86.761 277.778 8873.98 8950.52
13500.00 84.536 269.032 8881.58 8958.12
13540.40 83.670 265.481 8885.74 8962.28
13600.00 83.670 265.481 8892.31 8968.85
13700.00 83.670 265.481 8903.33 8979.87
13800.00 83.670 265.481 8914.36 8990.90
13900.00 83.670 265.481 8925.38 9001.92
14000.00 83.670 265.481 8936.41 9012.95
14100.00 83.670 265.481 8947.43 9023.97
14118.77 83.670 265.481 8949.50 9026.04
Sperry-Sun Drilling Services
Proposal Report for U-O2A RigWps - U-O2A Wp6
Revised: 22 January, 1999
Alaska State Plane Zone 4
PBU_WOA U Pad
Local Coordinates
Nothings
(~)
4212.91N
4260.21N
4307.52 N
4323.33N
4355.42 N
4379.62 N
4405.39 N
4411.54 N
4456.64 N
4507.89 N
4556.95N
4559.14 N
4605.02 N
4627.36 N
4640.01N
4661.00 N
4666.92 N
4665.00N
4660.33N
4652.50 N
4644.67 N
4636.64N
4629.01N
4621.18 N
4619.71N
Global Coordinates Dogleg Vedical
Eastings Nothings Eastings Rate Section
(~) (~) (~) (°/100~) (~)
4204.27W 5964948.65 N 627287.61E 0.000 5730.67
4291.69W 5964994.42 N 627199.37E 0.000 5830.06
4379.11W 5965040.18 N 627111.14 E 0.000 5929.44
4408.32W 5965055.48 N 627081.65 E 0.000 5962.65
4466.51W 5965086.54N 627022.92 E 9.000 6029.09
4509.01W 5965110.00 N 626980.00 E 9.000 6078.00
4552.71W 5965135.00 N 626935.85 E 9.000 6128.73
4562.86W 5965140.97 N 626925.59 E 9.000 6140.59
4636.99W 5965164.76 N 626850.68 E 0.000 6227.31
4721.25W 5965234.53N 626765.54 E 0.000 6325.88
4801.89W 5965282.17 N 626684.06 E 0.000 6420.21
4805.51W 5965264.30 N 626680.39 E 9.000 6424.45
4893.55W 5965328.63 N 626591.57 E 9.000 6523.67
4948.74W 5965350.00 N 626536.00 E 9.000 6582.72
4987.11W 5965361.98 N 626497.41 E 9.000 6622.36
5064.71W 5965381.25 N 626399.45E 9.000 6717.70
5184.14W 5965385.43N 626299.93 E 9.000 6807.24
5224.28W 5965382.81N 626259.64E 9.000 6841.27
5283.33W 5965377.11 N 626200.88 E 0.000 6890.43
5382.41W 5965367.54N 626101.95 E 0.000 6972.92
5481.49W 5965357.98 N 626003.02 E 0.000 7055.40
5580.57W 5965348.42 N 625904.09 E 0.000 7137.89
5679.66W 5965338.85 N 625805.16 E 0.000 7220.37
5778.74W 5965329.29 N 625706.23 E 0.000 7302.86
5797.34W 5965327.49 N 625687.66 E 0.000 7318.35
Comment
Start Dir @ 9.000°/100ft: 12633.41ft MD, 9012.25ft TVD
Target - U-02A Wp6 T2, Geological
End Dir: 12812.02ft MD, 9007.12ft TVD
Start Dir @ 9.000°/100ft: 13095.71ft MD, 8960.17ft 'I'VD
Target - U-02A Wp6 T3, Geological
End Dir: 13540.40ft MD, 8962.28ft TVD
Start Dir @ 9.000°/100ft: 14118.77ft MD, 9026.04ft TVD
Con#nued...
22 January, 1999- 15:36 -2- DrillQuest
Sperry-Sun Drilling Services
Proposal Report for U~O2A RigWps - U-O2A Wp6
Revised: 22 January, 1999
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_WOA U Pad
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (ft) (°ll00ff) (fi)
Comment
14200.00 87.637 271.640 8955.66 9032.20 4617.69 N 5878.25W
14287.07 91.919 278.205 8956.00 9032.54 4625.15 N 5964.93W
14300.00 91.919 278.205 8955.57 9032.11 4627.00 N 5977.72W
14400.00 91.919 278.205 8952.22 9028.76 4641.26 N 6076.64W
14500.00 91.919 278.205 8948.87 9025.41 4655.52 N 6175.56W
14600.00 91.919 278.205 8945.52 9022.06 4669.79 N 6274.48W
14700.00 91.919 278.205 8942.17 9018.71 4684.05 N 6373.40W
14749.98 91.919 278.205 8940.50 9017.04 4691.18 N 6422.84W
14800.00 91.919 278.205 8938.83 9015.37 4698.32 N 6472.33W
14900.00 91.919 278.205 8935.48 9012.02 4712.58 N 6571.25W
15000.00 91.919 278.205 8932.13 9008.67 4726.84 N 6670.17W
15100.00 91.919 278.205 8928.78 9005.32 4741.11 N 6769.09W
15200.00 91.919 278.205 8925.43 9001.97 4755.37 N 6868.01W
15212.89 91.919 278.205 8925.00 9001.54 4757.21 N 6880.76W
5965324.05 N 625606.80 E 9.000 7387.85
5965330.00 N 625520.00 E 9.000 7467.04
5965331.62 N 625507.18 E 0.000 7479.09
5965344.15 N 625408.02 E 0.000 7572.28
5965356.68 N 625308.87 E 0.000 7665.47
5965369.21N 625209.71E 0.000 7758.66
5965381.74 N 625110.56 E 0.000 7851.85
5965388.00 N 625061.00 E 0.000 7898.43
5965394.27 N 625011.40 E 0.000 7945.04
5965406.80 N 624912.25 E 0.000 8038.23
5966419.33 N 624813.09 E 0.000 8131.42
5965431.86 N 624713.94 E 0.000 8224.61
5965444.39 N 624614.78 E 0.000 8317.80
5965446.00 N 624602.00 E 0.000 8329.81
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
End Dir: 14287.07ft MD 9032.54ft TVD
Target - U-02A Wp6 T4,'Geological
Sail @ 91.919° Inclination on 278.205° Azimuth
Total Depth: 15212.89ft MD 9001 54ft TVD
4 1/2' Liher ' '
Target - U-02A Wp6 T5, Geological
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 299.390° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15212.89ft.,
The Bottom Hole Displacement is 8365.16ft., in the Direction of 304.659° (True).
Continued...
22 January, 1999 - 15:36 - 3- DrillQuest
Prudhoe Bay Unit
Sperry-Sun Drilling Services
Proposal Report for U-O2A RigWps - U-O2A .Wp6
Revised: 22 January, 1999
Alaska State Plane Zone 4
PBU_WOA U Pad
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
10400.00 8977.94 2859.94 N 2820.66 W
10440.00 8982.15 2899.23 N 2826.80 W
10757.20 8989.12 3180.26 N 2963.87 W
11559.76 8921.23 3779.19 N 3493.76 W
11817.85 8923.07 3937.52 N 3695.35 W
12633.41 9012.25 4323.33 N 4408.32 W
12812.02 9007.12 4411.54 N 4562.86 W
13095.71 8960.17 4556.95 N 4801.89 W
13540.40 8962.28 4665.00 N 5224.28 W
14118.77 9026.04 4619.71 N 5797.33 W
14287.07 9032.54 4625.15 N 5964.93 W
14749.98 9017.04 4691.18 N 6422.84 W
15212.89 9001.54 4757.21 N 6880.76 W
Comment
KOP: Start Dir @ 10°/100ft: 10400.00ft MD, 8977.94ft TVD
Start Dir @ 10.500°/100ft: 10440.00ft MD, 8982.15ft TVD
End Dir: 10757.20ft MD, 8989.12ft TVD
Start Dir @ 9.000°/100ff: 11559.76ft MD, 8921.23ft TVD
End Dir: 11817.85ft MD, 8923.07ft TVD
Start Dir @ 9.000°/100ft: 12633.41ft MD, 9012.25ft TVD
End DIr: 12812.02ft MD, 9007.12ft TVD
Start Dir @ 9.000°/100ft: 13095.71ft MD, 8960.17ft TVD
End Dir: 13540.40ff MD, 8962.28ft TVD
Start Dir @ 9.000°/100ft: 14118.77ft MD, 9026.04ft TVD
End Dir: 14287.07ff MD, 9032.54ft TVD
Sail @ 91.919° Inclination on 278.205° Azimuth
Total Depth: 15212.89ft MD, 9001.54ft TVD
Continued...
22 January, 1999 - 15:36 - 4 - DrillQuest
TONY KNOWLE$, GOVERNOR
ALASK~ OIL AND GAS
CONSERVATION COM~HSSION
3001 PORCUPINE DRIVE
ANCHORAGE. ,k~SKA 99501-3192
PHONE: (907) 279-1433
FAX: .907~ 276-7542
November 25. 1998
James E. Smith
Senior Drillin~ Enuineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchora~,e. AK 99519-6612
Re:
Pmdhoe Bay Unit U-02A
ARCO Alaska. Inc..
Permit No: 98-239
Sur Loc: 237'NSL. 2434'WEL Sec. 18. TllN. R13E. UM
Btmholc Loc. 373'NSL. 2O3'WEL. Sec. i i. T1 IN. R12E. UM
Dear Mr. Smith:
Enclosed is the approved application for permit to redrill thc above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by lax,,' from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations arc made.
Blowout prevention equipment (BOPE) must be tcstcd in accordance with 20 AAC 25 035.
Sufficient notice lapproximately 24 hours) must be given to ailow a representative of'thc
Com~iLn~s a test of BOPE installed prior to drilling new i~oie. Notice may be given
".;5' ~ tl~nm~s~~~olcum field inspector on ti~e North Siooe pa~er at 03%3607.
b,no~'N ~ % '",
David W. Jb~on , ~
Chairman ~'
BY ORDER OF THE COMSIISSION
df/Enclosures
cc:
Department of Fish & Game. Habitat Section w/o enci.
Department of Environmental Conscn'ation w/o cnci.
Alaska
hared
ervlces
rilling
WELL NAME
U-02A
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
The attached work cannot commence without obtaining the required signatures in I
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
I
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
Permit/~ume a~~fi~ Prepared:
ODE: /,(7~,... ,,7k,/4t~,2,,,~ Date:
Permit ~plication R~wed:
SDE~S:~ ~~ Date:'~¢~
Pe~it fi~l~J~n Sub~tted: .
PRE-RIG WORK
Pre-Rig Memo Reviewed:
SDE/ES: Date:
Pre-Rig Memo Sent to Slope:
ODE: Date:
Pre-Rig Sundry Documentation Prepared:
ODE: Date:
Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:
Pre-Rig Sundry Application Submitted:
TA: Date:
APPROVAL TO PROCEED
SUNDRY NOTICE
[~ Sundry Documentation Prepared:
ODE: Date:
I~ Sundry Application Reviewed:
SDE/ES: Date:
D Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK~ USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
Reason for Sundry (Check all that apply)
Abandon Change Approved Program
Alter Casing Operation Shutdown
Suspend Re-enter Suspended Well
Repair Well Time Extension
Plugging Perforate
VariancePull Tubing Sti~ck/k .
Other(Explain): ~,__ ~'"D
',vv i3
~p.~ Z~'~.
.. -"~' age ..... "~ton
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date:
STATE OF ALASKA
ALASKA'._ .~ AND GAS CONSERVATION COIv:~.~-ISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 77.5' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028260
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
237' NSL, 2434' WEL, SEC. 18, T11 N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
2968' NSL, 271' WEL, SEC. 13, T11N, R12E, UM U-02A
At total depth 9. Approximate spud date Amount $200,000.00
373' NSL, 203' WEL, SEC. 11, T11N, R12E, UM 11/26/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047451,373'I No Close Approach 2560 16868' MD / 8954' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 9890' MD Maximum Hole Angle 102° Maximum surface 2470 psig, At total depth CrVD) 8800' / 3000 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
6" 4-1/2" 12.6# L-80 IBT-M 7128' 9740' 8599' 16868' 8954' 820 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. 0RIr&INAL
Present well condition summary
Total depth: measured 10347 feet Plugs (measured)
true vertical 9210 feet ~0V
Effective depth: measured 10182 feet Junk (measured) Fill at 10182'
true vertical 9069 feet""-""°~'Alas~u"~t=asC°ns'C°n~mlssi°r~
Casing Length Size Cemented MD Anchorage TVD
Structural
Conductor 110' 20" x 30" 8 cu yds concrete 145' 145'
Surface 2645' 13-3/8" 3255 cu ft PF 'E', 465 cu ft PF II 2680' 2680'
Intermediate 9836' 9-5/8" 2380 cu ft Class 'G' 9871' 8804'
Production
Liner 741' 7" 270 cu ft Class 'G' 9606' - 10345' 8578' - 9210'
Scab Liner 6639' 7" 1028 cu ft Class 'G' 2965' - 9604' 2965' - 8578'
Perforation depth: measured 9885' - 9912' (Sag River)
10018' - 10070', 10080' - 10115', 10125' - 10170' (Ivishak)
true vertical subsea 8725' - 8749' (Sag River
8842' - 8975' (three Ivishak intervals)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby cer~fy that the fore,going is true and correct to the best of my knowledge
Signed a~~"~
J Title Senior Drilling Engineer Date . ,
Commission Use Only
Permit Number APl Number I Approval Date .- I See cover letter
50-029-21170 ---~,/I /J-" r~,,.~'""-~I for other requirements
Conditions of Approval: Samples Required I--lYes ~'No Mud Log Required I-lYes ..~'~No
Hydrogen Sulfide Measures ~'Yes'~ No Directional Survey Required ~_Yes []No
Required Working Pressure for BOPE []2K; 1--13K; 1--14K; [~5K; []10K; []15K
Other:
~,rlg,rla: Si.qned By by order of
Approved By 0avid W. Johnston Commissioner the commission Date / 1 - C~,~,"T'¢ ¢
Form 10-401 Rev. 12-01-85 Submit In Triplicate
I Well Name: I u-o2A
Well Plan Summary
]Type of Well (producer or injector): I Producer
Surface Location: 237' FSL, 2434' FEL, Sec. 18, Ti iN, R13E
X = 631,565 Y = 5,960,810
Target #1 Start: 2968' FSL, 271' FEL, Sec. 13, T11N, R12E
X = 628,732 Y = 5,963,493 Z = 8881' TVDss
Intermediate 3623' FSL, 383' FEL, Sec. 13, T1 IN, R12E
X = 628,609 Y = 5,964,146 Z = 8,941' TVDss
Target #1 End: 4403' FSL, 673' FEL, Sec. 13, T1 iN, R12E
X = 628,306 Y = 5,964,921 Z = 8,845' TVDss
Target #2 Start: 4878' FSL, 1402' FEL, Sec. 13, TllN, R12E
X = 627,569 Y = 5,965,384 Z = 8,930' TVDss
Intermediate 5023' FSL, 2163' FEL, Sec. 13, T1 IN, R12E
X = 626,805 Y = 5,965,516 Z = 8,841' TVDss
Intermediate 5160' FSL, 2879' FEL, Sec. 13, TI 1N, R12E
X = 626,087 Y = 5,965,641 Z = 8,950' TVDss
Intermediate 16' FSL, 3587' FEL, Sec. 12, T1 IN, R12E
X = 625,377 Y = 5,965,764 Z = 8,874' TVDss
Intermediate 150' FSL, 4294' FEL, Sec. 12, T1 iN, R12E
X = 624,668 Y = 5,965,887 Z = 8,956' TVDss
Intermediate 294' FSL, 5045' FEL, Sec. 12, T1 iN, R12E
X = 623,914 Y = 5,966,018 Z = 8,907' TVDss
Target #2 End: 373' FSL, 203' FEL, Sec. 11, T1 iN, R12E
X = 623,475 Y = 5,966,090 Z = 8,954' TVDss
I AFENumber: 1 4P1078
I Rig: [ Nabors 9ES
IEstimated Start Date: 11/26/98
IOperating days to
complete:
34
I MD 16,868' ] ITVDss: 18,954,
I KBE: 177.5'
IWell Design (conventional, slim hole,
etc.):
Extended Horizontal Sidetrack
Objective:
Sidetrack out of existing 7" liner into the Sag River formation,
directionally drill 6" hole thru (2) ZA targets, TD at 16,868' MD. Run,
cmt and test 4 1/2" solid liner, complete with 4 lA", L-80 tbg, (6) GLM's
and WOA tail assy.
Formation Markers
Formation Tops MD TVD(ss)
Begin sidetrack 9,890' 8,731' Sidetrack from Whipstock out of 7 "liner
into Sag River formation.
TShublik 9,906' 8,745'
TSAD 10,046' 8,841'
TZ4 10,046' 8,841'
Target 1 Start 10,259' 8,881'
Target 1 End 11,797' 8,845'
Target 2 Start 12,682' 8,930'
TD - Target 2 16,868' 8,954' Undulating thru both targets
HO/T 8,984'
OOWC 9,004'
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg MD/TVD MDfrVD
O.D.
6" 4 1/2" 12.6# L-80 IBT 7,128' 9,740'/8,599' 16,868'/8,954'
liner Mod
4 ¥2" 12.6# L-80 IBT 10,620' 30'/30' 9,540'/8,422'
compl. Mod
Logging Program:
I Open Hole Logs:
Drilling section: MWD/GR from KOP (9,890') to start target #1.
MWD/GRfRes to TD at 16,868' MD.
MADD pass as per Geologist request.
DPC Platform Express + Sonic will be run after reaching TD.
Sample catchers and rig site geologist on site before drill out of
window.
I Cased Hole Logs None
Mud Program:
Special design
considerations
Drill from KOP to TD with MI Flo-Pro Polymer system.
The formulation of the brine phase will be 6% KCL.
Density LSRV PV Gels Chlorides pH
(ppg) (cps)
8.7 55 - 60,000 < 15 10 sec. >18 30,000 9.0-9.5
to to expect to to
8.9 55 - 60,000 8-12 10 min. >20 30,000 9.0-9.5
Record LSRV at 1,2,3 minutes: Make certain they are elevated and flat.
Plan to run 3-5 % Lubetex by volume. Start 6", Z4 section at 3 %
Sweeps, Liner slugs and CBU sweeps at 150,000 cp w/60-80 rpm & reciprocation the full 90'.
Ensure good stocks of LCM on location.
Directional:
KOP:
1) 9,890' MD, drill out of 7 "liner via whipstock window at
316° azimuth, 28° inclination, build and turn angle to 84°
inclination, 350° azimuth to Start target gl at 10,259' MD,
8,964' TVDss', land at 90°at 10,900' MD, 8,943'TVDss, hold
azimuth thru entire target gl. Turn and land azimuth to 281° at
start target g2, hold azimuth to TD at 16,868' MD, 8,954'
TVDss.
Maximum Hole Angle:
Surface Shut-in
Close Approach Well:
Point to point separation
102° undulating thru target gl.
No wells will need to be shut-in and de-
pressurized before rig move on and off of
the well.
There are no close approach wells to this
wellbore identified by Sperry Sun.
Cement Data:
Casing/Liner Lead: Tail: Sxs/Wt/Yield Comments
Sxs/Wt/Yield
P&A of original well 127/15.8/1.15 Class "G", TOC 9,750'
432' + 10 bbl 135' above top perfs.
4 V2", 12.6g, L-80 liner 820/15.8/1.15 Class "G", 50% excess
OH
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and
annular preventer will be installed and is capable of handling maximum potential
surface pressures.
Diverter and BOPE system schematics on file with AOGCC.
Bottom hole pressure is 3,000 psi at 8,800' TVDss (estimated) through target #1 and 3,350 psi at 8,800
TVDss through target #2.
Maximum shut-in casing pressure is 2,470 psi (assumes 0.1 psi/ft gas gradient to
surface).
NO ANNULAR INJECTION IN THIS WELL.
U-09A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes
are generated, they will be taken to Pad 3 disposal site.
Contacts
Name Office Home Paqer
Bob Kaluza Drilling Eng. 564-5344 563 9059 275-1014
Tony Bunch Drilling Supt. 564-5219 229-0729 275-3703
Bob Metzger Geologist 564 4613 345 2592 223 7187
Daniel Hsi Pad Engr. 564 4513 345 5982 227 0439
Bruce Smith Asset Drilling Eng, 564 5173 345 2948 275 4600
Stuart Montaque Geophysicist 564 4029 561 9500 230 6335
Drilling Discussion
Well Obiective
The NW fault block of the U - Pad has 129 million reservoir bbls total pore volume, of which
approximately 107 million (83%) will be under flood. U-02A is a critical well for flood and MI
development, and will be a 7,000' undulating Z4B producer receiving support from three injectors.
This well will capture the reserves associated with current producers U-12 and U-02, as well as the
undrained region in the western most part of the U pad. The unrisked incremental reserves are 6.02
mmstb.
The expected average first year incremental oil rate is 2645 bopd at 60% WCUT and 699 scf/stb GOR.
Drilling Objective
The drilling objective is to pull the existing 4 ½" x 3 ½" tubing, mill up and retrieve the existing
production packer, dress the P & A cement plug to just below the Sag River perforations, set a
whipstock and mill through 7' liner casing into the Sag River formation. Directionally drill this 7,000'
undulating extended horizontal sidetrack thru two Z4B targets. Run, cement and test 4 ½" liner,
perforate and complete with 4 ½" tubing.
No large faults are predicted but small faults will occur with the potential for fluid loss. Several small
faults (10'-20') have been interpreted, but poor data quality precludes correlation of these faults
laterally for any significant mapable extent.
The designed well path optimizes structural position and reservoir exposure with undulations that will
be geosteered using MWD/GR/Res (real time). The criteria for geosteering are approximately 20'
standoff from the HOT and ensuring the wavelength of the undulation is targeted at 1500 feet or less.
The well will be completed as a Zone 4B producer with a 4 ½", L-80, 12.6# tubing, (6) GLM's and
WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation.
DRILLING HAZARDS AND CONTINGENCIES
Always have two levels of tested isolation before NU/ND.
SURFACE CLOSE APPROACH WELL SHUT-INS
There is no well that will need to be shut-in during the rig move on and off of the well. Careful
coordination with any ongoing pad or facility operations or activities will be initiated prior to
commencing the rig move.
DRILLING CLOSE APPROACH WELL SHUT-INS
No shut-ins identified on Sperry Sun directional well plan due to close approach requirements.
PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.4 ppg
EMW and the Sadlerochit is expected to be near 7.4 ppg. 8.7 - 8.8 ppg mud will be used drilling
the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the
reservoir pressure.
HOLE PROBLEMS
The well's design cuts 10 small faults in the reservoir section, however only (2) of the faults are large
enough and areally extensive to be mapped. Be prepared for the possibility of lost circulation. The
original wellbore, U-02, did not experience lost circulation. Other wells in the intermediate vicinity
have experienced minor lost circulation.
No major faults have been identified and no major hole problems are expected.
H__~_S: U-Pad is not an H2S Pad
There are no reported incidents of H2S at well U-02. H2S precautions will be in effect at all times.
These include (but are not limited to):
· Regular H2S drills (minimum of two per week)
· Proper training of all permanent onsite personnel, unescorted visitors and temporary
onsite personnel;
H2S monitors with both audible and visual alarms;
Access to 5-minute emergency escape air packs;
Personal H2S monitors;
Functional wind indicator;
Posted evacuation routes (minimum of two);
Muster points in designated safe areas;H_a_S;
Functional communications between rig camp and rig floor.
Fault Evaluation
See Hole Problems. The original wellbore, U-02, did not experience lost circulation. Other
wells in the immediate vicinity have experienced lost circulation: U-03, U-11, U-13, U-14, H-
10, H-12, and H-32.
Alert: The kick off will be high in the Sag River in a known fault area. There is a remote
possibility of drilling into the Kingak shale if a downthrown fault is encountered soon after
Kick off. Carefully check return cuttings when drilling out of the window, if the Kingak is
encountered we will plug back and kick off deeper.
Casing Shoe Kick Tolerance
The smallest kick tolerance for the 9 5/8" casing shoe is calculated as infinite of influx assuming a
swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg
MW (TSAG 9,883' MD & 8,725' TVDss, 7.8 ppg reservoir pore pressure), and min. frac at shoe of
12.0 ppg.
SUMMARY PROCEDURE
Pre-Ri~ Ooerations:
-ozA
RU CT RIH to top offish at + 10,182', circ and clean hole. Spot cement from TD (10,182') to
9,750'; hesitation squeeze 10 bbls into open perforations (est. 127 sx, 15.8 ppg, 1.15 yield, 'G' cmO.
Open perforations from 9,885' to 10,170'. Cement top MUST NOT be above 9,700' MD (minimum
per AOGCC = 9,785' MD or 100' above uppermost perforation and 10,182' MD, total open hole
depth below bottom perforations). After spotting and squeezing cement, pull up to 9,750' (top of
cement) circulate out any excess cement and circulate well to seawater.
2. Wait 12 hrs. (minimum). RIH with CT, tag cement to verify TOC.
.
RU electric line and make a tubing chemical cut in the first pup joint above the 7" TIW production
packer _+ 9,556' tubing MD. Circulate well to seawater through the cut. Freeze protect to +_ 2,200'
MD.
Note: use 6 arm chemical cutter. Pup joint above the packer is 10' long. Cut the pup joint 3'
below top of joint.
4. Test the 9 5/8" packoff and tubing hanger (through test port) to 5000 psi. If the 9 5/8" packoff tests,
completely back out and check each lock down screw for breakage (check one at a time).
5. Set a BPV in preparation of the rig sidetrack.
Ri~ Sidetrack Procedure
1. MIRU. ND tree, NU and test BOPE. Circulate well clean. .
2. Pull the 4 V2" x 3 V~." tubing completion. Tubing cut during pre-rig at
3. Replace ~e le~ng 9 5/8" packoff if necess~.
4. RIH w/3 V2" Overshot, retrieve 'G' seal assy.. ~H relieve K-~chor.
5. Mill up and retrieve the Brown 3-H packer.
6. ~ w/Drill out assembly tag cement and test casing to 3,000 psi. Dress cement to ~ 9,905'. Ckc
well. POOH.
7. Set 9 5/8"whipstock on cement top and mill window ~ Sag prefs.
8. ~ck-off ~d dkecfionally &ill 6" hole to 16,868' TD.
9. Run DPC log suite at TD.
10. Run and cement 4 V2", L-80 solid production liner(cement behind the entire liner).
11. Perforate DPC
12. Run 4 W', L-80 tubing completion.
13. ~ BOPE, ~ and test ~ee. ~MO.
TREE: 4" - 5M - McEVOY
WELLHEAD: 13-5/8" - 5M - McEVOY - SSH
ACTUATOR: OTIS
4 1/2" 12.6# L-80 BTRS TBG
TUBING ID -3.958"
CAPACITY: 0.0152 EEL/FT.
2680'
2965'
2970'
CMT'd
13 3/8" 72#/ft L-80 BTRS
7" TIW S-6 LINER TOP PACKER
7" TIW LINER HANGER
3 1/2" 9.3# L-80 EUE 8RD TUBING
TUBING ID: 2.992"
CAPACITY: 0.0087 BBL/FT
KOP: 3037'
MAX ANGLE: 38° @ 5470'
7" 26# L-80 TC4S SCAB LINER
U-U:
KB ELEV = 84.96'
[ .EV = 49.48'
4 1/2" SSSV LANDING NIPPLE I
(OTIS) (3.813" ID) 2082'
4-1/2" GLM top at 2888'[CAMCO W/1-1/2"] With
broken RK Latch NO. 6.
4.5" Tubing Patch (OD=3.75", ID= 3.25"
Length = 21.75') over GLM #6, top seal at 2885.5'
DD
HOLE IN 9-5/8" CASING 3150-3188'
4 1/2"x 3 1/2" X-OVER I 5543' I
i
i
3 1/2" GAS LIFT MANDREL~
McMurmy w/[ 1 "BK-2 LATK]
No. MDBKB -I-VDss
41/2"
6 see above 2803'
5 5553' 5065'
4 7374' 6558'
3 8534' 7558'
2 9285' 8199'
1 9628' 8410'
7" BAKER SEAL ASSY ,
STEM w/SEALS I 9604'
TOP OF BAKER I 9606' I
9 5/8" 47# L-80 BTRS
PERFORATION SUMMARY
REF: LOG: BHCS 9-4-84
21/8" I 4
21/8" I 4
21/8" I 4
41/2" I 4
~ 11//~" ~
9868' I --
INTERVAL OPEN/SQZ'D
9885-9912'
10,018-10,070'
10,080-10,115'
10,018-10,070'
10,080-10,095'
10,125-10,170'
OPEN/5-10-88
OPEN/7-31-85
OPEN/7-31-85
REPERF/8-16-90
REPERF/8-16-90
OPENF/-31-85
PBTD
7" 29# L-80 BTRS
110,303' I
I 10,345' I
3 1/2 .... SWS" NIPPLE
(PARKER) (2.75" ID)
7" TIW PACKER
(HBBP) (3.875" ID)
3 1/2" "SWS" NIPPLE
(PARKER) (2.75" ID)
3 1/2 .... SWS" NIPPLE
(PARKER) (2.75" ID)
3 1/2" WLEG
(PARKER) (2.99" ID)
~1 SAGRIVER
(ELMD)
9567'
9607'
9628'
9639'
9636'
REPERFS
2" X 7" BULLNOSE FROM PERF GUN
LOST 7-27-89 AT PBTD 10,182' ELMD.
DATE
9-8-84
REV. BY
COMMENTS
INITIAL COMPLETION
8-22-90 LGM 1990 RIG WORKOVER
4-9-92 A. TEEL REVISED
9/3/94 J. Attid
Tubing Patch over GLM # 6
PRUDHOE BAY UNIT
WELL: U-02 (42-13-11-12)
APl NO: 50-029-21170
SEC 18; TN 11N; RGE 13E
BP Exploration (Alaska)
TREE: 4"-EM-McEVOY UgU2 Pre-Rig KB. ELEV=84.96'
WELLHEAD: 13-5/8" - 5M - McEVOY - SS~ . ' ...... BF. ELEV = 49.48'
ACTUATOR: OTIS
4 1/2" SSSV LANDING NIPPLE 2082'
O (OTIS) (3.813" ID)
4 1/2" 12.6# L-80 BTRS TBG
TUBING ID -3.958"
CAPACITY: 0.0152 EEL/FT. 4-1/2" GLM top at 2888'[CAMCO W/1-1/2"] With broken
I ~ RK Latch NO. 6.
CMT'd -- ~[~ L~ 4.5" Tubing Patch (OD=3.75", ID= 3.25"
2680' 13 3/8" 72#/ft L-80 BTRS ~ k Length = 21.75') over GLM #6, top seal at 2885.5' DD
2965'
7" TIW S-6 LINER TOP PACKER
~-~.-'~: :*;'"~*~ HOLE IN 9-5/8" CASING 3150-3188'
2970' 7" TIW LINER HANGER
~i / i~ 4 1/2" x 3 1/2" X-OVER 5543'
I
3 1/2" 9.3# L-80 RUE 8RD TUBING
~.~ ~:~.~;{~? 3 1/2" GAS LI~ MANDRELS
¢~,;~s. ¢~?~;$$~ McMurray w/[ 1 "BK-2 ~TK1
TUBING ID: 2.992" ;";~ B~4~$ No. MDBKB ~Dss
.............
CAPACI~: 0.0087 BBU~ ;~¢~ ;~ ~ 4 1/2"
[ I '~' ~'~; 15 5553' 5065'
KOP: 3037'
MAX ANGLE: 38° e 5470' ;~ ~ 4 7374' 6558'
~ ;~ 3 85~' 7558'
~ ~ 2 9285' 8199'
7" 26ff L-80 TC4S SCAB LINER ~ ~; 1 9528' ~10'
STEM w/SEALSI 9604'I
I ~ ~Tubing Cut 9,556'
7" LINER TIE BACK ~. .. ~ 3 1/2" "SWS" NIPPLE 9552'
~~~ X~ (PARKER) (2.75" ID)
7" TIW PACKER 9567'
~ (HBBP) (3.875" ID)
~ ~ ~ (PARKER) (2.75" ID) 9607'
9 5/8" 47¢ L-80 BTRS 9868'
~ (PARKER)(2.75" ID) 9628'
PERFORATION SUMMARY ~ 3 1/2" WLEG
REF: LOG: BHCS 9-4-84 ........................ ~~ (PARKER) (2.99" ID) 9639'
2 ~/a" 4 ~aas- ~2' o~[~/s-~o-~a p of Gement 0,750'
2 ws" 4 ~o,o~8 - ~o,o7o' o~fi~-a~-ss
KO~
2 1/8" 4 10,080- 10,115' OPEN~-31-85
4 1/2" 4 10,080- 10,095' REPERF/8-16-90
2 1/8" 4 10,125 - 10,170' OPEN~-31-85
...........................
.........................
.....
2" X 7" BULLNOSE FROM PERF GUN
PBTD I 10,303' I LOST 7-27-89 AT PBTD 10,182'ELMD.
.T.S I 0,a45'
9-8-84 INITIAL COMPLETION
8-22-90 LGM 1990 RIG WORKOVER WELL: U-02 (42-13-11-12)
4-9-92 A. TELL REVISED
9/3/94 J. A~id ubing Patch over GLM ¢ 6 BP Exploration (Alaska)
3 1/2" GAS LIFT MANDRELS
McMurmy w/[ 1 "BK-2 LATK1
No. MDBKB TVDss
41/2"
6 8¢~ above 2803'
5 5553' 5065'
4 7374' 6558'
3 8534' 7558'
2 9285' 8199'
1 9528' 8410'
TREE: 4" CIW - 5M - McEvoy
WELLHEAD: 13 R/IR" - RM - Mc. Ewv
13 3/8" 72# L-80 BTRS
2680'
CMT'd --
7" TIW S-6 Top Packer 2,965' I -- --
4 1/2", 12.6#/ft, L-80
TUBING ID: 3.958"
U-02A
KB. ELEV = 77.46
SSSV LANDING NIPPLE I 2082'
(~TI -'~ ! ~ o~'~"
GAS LIFT MANDRELS
CAMCO w! RK _ATCH)
1
2
3
4
5
6
7", 26#, L-80, TC4S Scab Liner
4-1/2" X Nipple @ 9,488' MD
7" Production Packer @ 9,498' MD
4-1/2" X Nipple @ 9,518' MD
4-1/2" XN Nipple @ 9,528' MD
7" BAKER TIEBACK
RECEPTACLE
9,606'
9 5/8" 47# L-80 BTRS I 9,868' I
KOP I 9,868'
Whipstock @ 9,910' MD
PERFORATION SUMMARY
REF LOG: SWS - BHCS 11-14-86
SIZE SPF INTERVAL OPEN/SQZ'D
FISH: 2" x 7" Bullnose from Perf Gun I 10,182'
PBTD I 101303'
7", 47# L-80 IJ4S I 10,345'
J
-1/2" Liner Top @ 9,740' MD
4-1/2 12.6# L-80 IBT-mod Liner
TD @ 16,868' MD
PBTD @ 16,788' MD
All Perforations Plugged
during Pre-Rig work
DATE
9-8 - 84
REV. BY
9 -3- 94
COMMENTS
INITIAL COMPLETION
8-22-90 LGM POST 1990 WORKOVER
4 - 9 - 92 A. TEEL REVISED
J. Attid Tubing Patch over GLM #6
BP
PRUDHOE BAY UNIT
WELL: U-02A {42-13-11-12)
APl NO: 50-029-21170
SEC 18; TN 11N; RGE 13E
Exploration (Alaska)
I
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_WOA U Pad
U-02A -
bnarea Services Drtlling
Well' U-O2A Wp2
Scale: linch = 80Oft -8q00
4 1/2' Liner
MD
-7~00
-SE
Eastings
DRAFT COPY
FOR P[ANNIN6 PURPOSES
ONlY
8989.70 9038.70
~.02~112-1nt3
PRELIMINARY
/~-4rZ~/2-/nt !
Po/hr
P=/nt
9032.70
SURFACE LOCATION PLOT DATE: 15-Jul-98
Horizontal Coordinates: 5960810.00 N. 631565.00 E Created By:
RKB Elevation: ~ 35.30 ItRig (EST)
47.46 It We# (CBE)
82.76 It RKB - AMSL Checked By
Coordinate System: NAD27 Alaska State
Zone 4. US Foot -f Approved By:
DRAFT ONLY
40,~9.2, 7 ~.
Point
8927.7~
4107.43N.
I)-02~1Tl-ln$
Point
~023. Y0
I)-02d TI- !
P~in~
8903. Y0
2732.19]t
I i I
-7200 -6400 -5600
I
-4800
Eastlngs
1
-4000
I
-3200
I DrillQuest'
40OO
-8000 -2400
Scale: linch = 800ft Reference is True North
Well: U-O2A Wp2
Prudhoe Bay Unit
Alaska State Plane Zone 4
PBU_WOA U Pad
U-02A
- D FT COPY
FOR PLANNING PURPO. E5
PRELIMINARY ONlY
15-Jul-98
SURFACE LOCATION,IPLOT DATE
J Horizontal Coordlnate~: 5960810.00 N. 631565.00 E I Created By:
IRKB Elevation: 35.30 ft R~g (EST)
I
47.46 It Well (CBE)
82.76 It RKB - AMSL ~ Checked By:
I
Coordinata System: NAD27 Aiaska State Ptane~.
Zone 4. US Fool! Approved By-.
I DrillQuest'
Proposal Data for U-02A Wp2
J
V~l ~: Well
No~h Rele~eeee: Tree Nor~ !
Vertical Section ~n: 0.~ N.O.~ E
Mealul~ Ifl~. ~im. VeStal N~ingl EastinglVe~lcalO~
9890.00 27 ..',aS 3t,~ II0 8113.94 2435OO N 20y3 ~l w 3541.78
102~ 02 X4 071 ~9.347 ~2 8S 272) a~ N2'~a ,~ W ~762 34
10258 ~ ~.1013~.37~ R~3.76 27~.19 ~ 2'~ ~9 W~76~ 73
102~8 55 ~.101~3~5 8~3.76 2~32 2o ~273~ ~9 w
1~26.~95,~ 3~.~ ~23.76 3317.39 N~SO~W 4186.2~
t~88.16 102.120 352.1~ ~14.~6 3~.73 N 2~1 w 4224.15 12.~
11312.28 102.1~ 352,1~ ~.51 3761.63 N:9~0 03 W ~1607 O~
117~6383.1 Il ~7,735 8927.76 4167.43 N3130.~2 w a~31.23 10.~
I1~.~ 82.113 307.135a~7.76 4167,~ N 3186.52 W 4821.23 I0~
12379.16 83.113 307.73~~7.70 4~.37 N 3~2.~5 W
12~1~ ~.~ 2~.8~ ~12.76 a~3.27 N ~91~.30 w 5689.73 to.~
127~.~98.~82~.8~ ~.~ ~7.47 N 393730 W5710.9~ 10~
13~1.71 98,~12~,129 ~4.12 4758J9 N 4~18.:1 W 6271.~0,~
I~.~ 82.~ 2M.~ B~3.76 4789.~ N ~.36 w ~2S.2610.~
1~17.~79.~52~,~ 8~7J2 4~3.31 N 47~.21 W~7.32 IO.~
l~3l.l/ ~.~l 2~.~5 ~6J7 4~J,13 N 523248w 6~1 ~ o.~
14~17.19 97,476 3~,~5 ~31,o3 4~.~ N ~.u w 7129,7~ lo.~
14783~1 97.476 2~.N5 ~7~ ~.ll N ~951.19 W t~l.~ o.~
14~1.14 13.~ 2~.~ ~M.76 ~2.~ N 61~.~ w 7798.86 IO.~
149~2.~ 82.610 2~.~ 89~7.25 5~.73 N 6103,80 w
1~5~9.62 12,610 2~.~ ~5.~ 5175.~ N ' ~9~.~ W 8373,~0.~
15~3.52 ~.~ 2~.~ ~8,76 5197,~ N ~07.30 w~81.4~10.~
15657.28 ~.~9 2~.881 ffi38.a95197.71 N~10.98 W~.98 10.~
16316.79 ~.~9 2~.881 1981.2~ 3321.~ N 74~.76 w9108.~o.~
1~20.97 83.~ 2~.~7 ~89.76 5~ I,~ N 75~9,~ W9207.~10.~
1~67.~83.~ 2~.~7 ~.16 ~.~ N 7~.31 W ~27.3J0.~
I 27,.~2. lO W'. 2Z&5'~IV'" I 33,~?~0 t~. Z$O?.O0 w
3500 4200 4900 5600 6300 7000 7700 8400 9100 9800
Scale: linch = 7bOlt Vertical Section Section Azimuth: 299.380' (True North)
Prudhoe Bay Unit
Measured
Depth Incl. Azim.
(~)
9890.00 27.548 315.810
9900.00 29.505 318.928
9905.82 30.675 320.573
10000.00 51.280 337.146
10045.51 61.770 341.822
10100.00 74.494 346.341
10140.77 84.071 349.347
10200.00 84.071 349.347
10250.02 84.071 349.347
10258.54 84.101 350.375
10258.55 84.101 350.375
10300.00 84.101 ' 350.375
10400.00 84.101 350.375
10500.00 84.101 350.375
10600.00 84.101 350.375
10700.00 84.101 350.375
10800.00 84.101 350.375
10835.47 84.101 350.375
10900.00 91.841 350.109
10926.34 95.000 350.000
10988.16 102,120
11000.00 102.120
11100,00 102.120
11200.00 102.120
71300.00 102.120
PRELIMINARY
Sperry-Sun Drilling Services
Proposal Report for U-O2A Wp2
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
8731.18
8739.96
8745.00
8815.92
8841.00
8861.26
8868.84
8874.95
8880.12
8881.00
8881.00
8885.26
8895.54
8905.81
8916.09
8926.37
8936.64
8940.29
8942.57
8941.00
8813.94 2435.00N 2693.61W
8822.72 2438.52 N 2696.84W
8827.76 2440.75 N 2698.72W
8898.68 2493.88 N 2728.66W
8923.76 2529.41 N 2741.85W
8944.02 2577.94 N 2755.60W
8951.60 2617.05 N 2764.01W
8957.71 2674.95 N 2774.90W
8962.88 2723.85 N ~2~84.09W__
8963.76 2732.19 N 85.59W
8963.76 ~ 27 785.59W
89~11t3(3~, ~870.92 N 2809.11 W
~11~~ 2968.99 N 2825.74 W
'~l~-J 3067.06N 2842.38W
9009.13 3165.13N 2859.01W
9019,40 3263.20 N 2875.64W
9023.05 3297.98 N 2881.54W
9025.33 3361.50 N 2892.46W
9023.76 3387.39 N 2897.00W
352.106 8931.80 9014.56 3447.73 N 2906.51W
352.106 8929.32 9012.08 3459.20 N 2908.10W
352.106 8908.32 8991,08 3556.04 N 2921.53W
352.106 8887.32 8970.08 3652.89 N 2934.98W
352.106 8866.33 8949.09 3749.73~~ 2948.38W
Global Coordinates Dogleg Vertical
Northings Eastings Rate' Section
(fi) (fi) (°/100fi) (fi)
5963197.47 N 628829.17 E 3541.78
5963200.92 N 628825.88 E, 24.580 3546.32
·
5963203.12 N 628823.95 E,, 24.580 '3549.06
5963255.72 N 628793.09 E 24.580 3601.21
5963291,01 N 628779.28 ~ 24.580 3630,13
5963339,30 N 628764.68 E', 24.580 3665.93
5963378.26 N 628755,59 E ' 24.580 3692.44
5963435.96 N 628743.69 E 0.000 3730.34
5963484.68 N 628733.64 E 0.000 3762.34
5963493.00 N 628732.00 E 12.000 3767.73
5963493.00 N 628732.00E 12.000 3767.74
5963533.53 N 628724.39 E 0.000 3793.69
5963631.29 N 628706.05 E 0.000 3856.29
5963729.06 N 628687.70 E 0.000 3918.90
5963826.82 N 628669.36 E 0.000 3981.50
5963924.59 N 628651.01E 0.000 4044.11
5964022.35 N 628632.67 E 0.000 4106.71
5964057.02 N 628626.16 E 0.000 4128.92
5964120,33 N 628614.13 E 12.000 4169.59
5964146.15 N 628609.13 E 12.000 4186.25
5964206.31 N 628598.57 E 12.000 4224.15
5964217.75 N 628596.78 E 0.000 4231.16
5964314.34 N 628581.65 E 0.000 4290.37
5964410.94 N 628566.53 E 0.000 4349.58
5964507.53 N 628551.41 E 0.000 4408.80
FOR
DRAFT COPY
PLANNING PURPOSES
Ol kY 'A,aska State plane Zone 4
PBU_WOA U Pad
Comment
KOP: Start Dir @ 24.580°/100fi: 9890.00ft MD, 8813.94ft TVD
Shublik
Top SadlerochiVTZ4
End Dir, Sail @ 84.071°: 10140.77ft MD, 8951.60ft TVD
Start DIr @ 12.000°/100ft: 10250.02ft MD, 8962.88ft 'Pv'D .~
End DIr. Sail @ 84.101°: 10258.54ft MD 8963 76ft TVD
Target: U-02A T1-1, Ddllers r ' ' '
-.
Start DIr @ 12.000°/100ft: 10835.4.7ft MD, 9023.05ft TVD
faOntinue DIr @ 12.000°/100ft: 10926.34ft MD, 9023.76ft 'l-VD
rget: U-02A Tl-lnt, Geologica
..~
End Dir, Sail @ 102.120°: 10988.16ft MD, 9014,56ft 'I'VD
Continued...
15 July, 1998- 15:27 - 1- DrillQuest
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
11312.28 102.120 352.106 8863.75 8946.51
11400.00 98.694 343.895 8847.88 8930.64
11500.00 94.581 334.716 8836.30 8919.06
11600.00 90.353 325.643 8831.99 8914.75
11700.00 86.116 316.579 8835.07 8917.83
11796.63 82.113 307.735 8845.00 8927.76
11796.64 82.113 307.735 8845.00 8927.76
11800.00 82.113 307.735 8845.46 8928.22
11900.00 82.113 307.735 8859.18 8941.94
12000.00 82.113 307.735 8872.91 8955.67
12100.00 82.113 307.735 8886.63 8969.39
12200.00 82.113 307.735 8900.35 8983.11
12300.00 82.113 307.735 8914.08 8996.84
12379.16 82.113 307.735 8924.94 9007.70
12400.00 83.049 305.857 8927.63 9010.39
12500,00 87.625 296.934 8935.77 9018.53
12600.00 92.259 288,070 8935.88 9018.64
12681.50 96.000 280.809 8930.00 9012.76
12700.00 97.850 280.825 8927.77 9010.53
12704.08 98.258 280.829 8927.20 9009.96
12800.00 98.258 280.829 8913.42 8996.18
12900.00 98.258 280.829 8899.06 8981.82
13000.00 98.258 280.829 8884.70 8967.46
13100.00 98.258 280.829 8870.33 8953.09
13200.00 98.258 280.829 8855.97 8938.73
Sperry-Sun Drilling Services
Proposal Report for U-O2A Wp2
Local Coordinates
Northings Eastings
(~) (~)
3761.63N 2950.03W
3845.92 N 2967.98W
3938.71N 3003.07W
4025.27 N 3052.70W
4102.98 N 3115.36W
4167.43N 3186.52W
4167.44N 3186.52W 5964~21.00 N
423O. lO. 3267.~~,.~2.23,
4351.~,~,,'3~,24.1~ 59651oo.72.
~~-~.ao.64w 59~521~.20N
~~' 3542.85W 5965266,09 N
4~95N 3659.40W 5965278,18 N
4584.78 N 3744.38W 5965328.52 N
4623.00N 3836.65W 5965365.12 N
4643.27 N 3915.30W 5965384.00 N
4646.71N 3933.34W 5965387.13 N
4647.47 N 3937.30W 5965387.82 N
4665.31N 4030.54W 5965404.02 N
4683.90 N 4127.74W 5965420.91N
4702.49 N-~ 4224.94W 5965437.79 N
4721.08 N 4322.14W 5965454.68 N
4739.68 N 4419.34W 5965471.57 N
Global Coordinates
Northings Eastings
(~) (~)
5964519.40 N 628549.55 E
5964603.36 N 628530.13 E
5964695.52 N 628493.42 E
5964781.20 N 628442.29 E
5964857.80 N 628378.27 E
5964921.00 N 628306.00 E
628306.00 E
628303.33 E
628223.94 E
628144.56 E
628065.17 E
627985.78 E
627906.40 E
627843.55 E
627826.79 E
62774O.92 E
627647.99 E
627569.00 E
627550.90 E
627546.93 E
627453.39 E
627355.88 E
627258.37 E
627160.85 E
627063.34 E
Dogleg Vertical
Rate Section
(°/100fi) (fi)
0.000 4416.07
10.000 4473.06
10.000 4549.16
10.000 4634.87
10.000 4727.60
10.000 4821.23
10.000 4821.23
0.000 4824.52
0.000 4922.53
0.000 5020.53
0.000 5118.53
0.000 5216.53
0.000 5314.54
0.000 5392.12
10.000 5412.61
10.000 5512.09
10.000 5611.24
10.000 5689.72
10.000 5707.13
10.000 5710.95
0.000 5800.95
0.000 5894.77
0.000 5988.59
0.000 6082.41
0.000 6176.23
FOR
COPY
PLANNING'PURPOSES
0~LY Alaska State Plane Zone4
PBU_WOA U Pad
Comment
Start'Dir @ 10.000°/100fl: 11312.28ft MD, 8946.51ft TVD
End Dir, Sail @ 82.113": 11796.64ft MD, 8927.76ft TVD
Target: U-02A T1-2, Drillers
Start Dir @ 10.000°ll00ft: 12379.16ft MD, 9007.70ft TVD
Continue DIr @ 10.000°/100ft: 12681.50ft MD, 9012.76ft TVD
Target: U-02A T2-1, Drillers
End Dir, Sail @ 98.258°: 12704.08ft MD, 9009.96ft TVD
Continued...
15 July, 1998 - 15:27 .2 - DrillQuest
Prudhoe Bay Unit
PRELIMINARY
Measured Sub-Sea VeHical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
13300.00 98.258 280.829 8841.61
13301.71 98.258 280.829 8841.36
13400.00 88.429 280.817 8835.64
13464.29 82.000 280.809 8841.00
13487.86 79.645 280.895 8844.76
13500.00 79.645 280.895 8846.94
13600.00 79.645 280.895 8864.92
13700.00 79.645 280.895 8882.89
13800.00 79.645 280.895 8900.87
13900.00 79.645 280.895 8918.64
14000.00 79.645 280.895 8936.82
14038.87 79.645 280.895 8943.81
14100.00 85.757 280.863 8951.57
14200.00 95.757 280.810 8950.25
14202.43 96.000 280.809 8950.00
14217.19 97.476 280.845 8948.27
14300.00 97.476 280.845 8937.49
14400.00 97.476 280.845 8924.48
14500.00 97.476 280.845 8911.47
14600.00 97.476 280.845 8898.46
14700.00 97.476 280.845 8885.45
14783.38 97.476 280.845 8874.60
14800.00 95.814 280.841 8872.68
14900.00 85.814 280.816 8871.26
14928.14 83.000 280.809 8874.00
Sperry-Sun Drilling Services
Proposal Report for U-O2A Wp2 DP~F~ COPY
FOR PLANNING PURPOSES
Alaska State Plane Zone 4
ONLY U Pad
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section
(fi) (ft) (ft) (ft) (°/100ft) (ft)
Comment
8924.37 4758.27 N 4516.55W 5965488.46 N 626965.83 E 0.000 6270.06
8924.12 4758.59 N 4518.21W 5965488.74 N 626964.16 E 0.000 6271.66
8918.40 4776.99 N 4614.47W 5965505.46 N 626867.60 E 10.000 6364.57
8923.76 4789.00N 4677.36W 5965516.37 N 626804.50 E 10.000 6425.26
8927.52 4793.38 N 4700.21W
8929.70 4795.64N 4711.94W
8947.68 4814.23 N ~.t~08.54W
8965.65 4832.83N ~,~1~05.14W
89~.~ 4851.4~'~.\ ~.73 w
~ 4926.50N 5392.45W
.03~.0~ .~2~.2s. 540~.8sw
9020.25 4944.70 N 5487.49W
9007.24 4963.36 N 5584.87W
8994.23 4982.01N 5682.25W
8981.22 5000.67 N 5779.63W
8968.21 5019.33 N 5877,00W
8957.36 5034.88 N 5958.19W
8955.44 5037.99 N 5974.41W
8954.02 5056.75 ~ 6072.50W
8956.76 5062.00 N 6100.00W
5965520.35 N 626781.58 E 10.000 6447.32
5965522.40 N 626769.81 E 0.000 6458.65
5965539.30 N 626672.90 E 0.000 6551.95
5965556.20 N 626576.00 E 0.000 6645.24
5965573.10 N 626479.09 E 0.000 6738.54
5965590.00 N 626382.18 E 0.000 6831.84
5965606.90 N 626285.27 E 0.000 6925.13
5965613.46 N 626247.60 E 0.000 6961.40
5965623.86 N 626187.89 E 10.000 7018.87
5965640.91N 626089.50 E 10.000 7113.55
5965641.33 N 626087.12 E 10.000 7115.84
5965643.83 N 626072.67 E 10.000 7129.74
5965657.86 N 625991.77 E 0.000 7207.58
5965674.81 N 625894.08 E 0.000 7301.59
5965691.76 N 625796.39 E 0.000 7395.60
5965708.70 N 625698.70 E 0.000 7489.61
5965725.65 N 625601.01 E 0.000 7583.61
5965739.78 N 625519.56 E 0.000 7661.99
5965742.60 N 625503.29 E 10.000 7677.65
5965759.65 N 625404.89 E 10.000 7772.32
5965764.42 N 625377.30 E 10.000 7798.86
Start Dir @ 10.000°/100ft: 13301.71ft MD, 8924.12ft TVD
aagnflnue Dlr @ 10,000°/100ff: 13464.29ft MD, 8923.76ft 'I-VD
SadlerochiFTZ4
et: U-O2A T2-1ntl, Geological
End Dir, Sail @ 79.645°: 13487.86ft MD, 8927.52fl ']'VD
Start DIr @ 10.000°/100ff: 14038.87ft MD, 9026.57ft TVD
.~arnflnue Dir @ 10.000°/100fi: 14202.43ft MD, 9032.76ft TVD
get: U-02A T2-1nt2, Geological
End Dtr, Sail @ 97.476°: 14217.19ft MD, 9031.03ft TVD
Start Dir @ 10.000°/100ft: 14783.38ft MD, 8957.36ft,TVD
Continue Dir @ 10.000°/100fi: 14928.14ft MD, 8956.76ft TVD
Target: U-02A T2-1nt3, G.eological
Continued...
o 3. DrillQuest
15 July, 1998 - 15:27
Prudhoe Bay Unit
Measured
Depth Incl.
(ft)
Azim.
14932.04 82.610 280.806
1500o.00 82.610 280.806
15100.00 82.610 280.806
15200.00 82.610 280.806
15300.00 82.610 280.806
15400.00 82.610 280.806
15500.00 82.610 280.806
15539.62 82.610 280.806
15600.00 88.648 280.807
15653.52 94.000 280.809
15657.28 94.369 280.881
15700.00 94.369 280.881
15800.00 94,369 280.881
15900.00 94.369 280.881
16000.00 94.369 280.881
16100.00 94.369 280.881
16200.00 94.369 280.881
16300.00 94.369 280.881
16316.79 94.369 280.881
16400.00 86.059 280.455
16420.97 83,965 280.347
16500.00 83.965 280.347
16600.00 83.965 280.347
16700.00 83.965 280.347
16800.00 83.965 280.347
PREL M NARY
Sub-Sea Ve~ical
Depth Depth
(~) (~)
8874.49 8957.25
8883.23 8965,99
8896.09 8978.85
8908.95 8991.71
8921.82 9004.58
8934.68 9017,44
8947.54 9030.30
8952,64 9035.40
8957,24 9040.00
8956.00 9038,76
8955.73 9038.49
8952,47 9035.23
8944,85 9027.61
8937.24 9020.00
8929,62 9012.38
8922.00 9004.78
8914.38 8997.14
8906.77 8989.53
8905,49 8988.25
8905.18 8987.94
8907,00 8989.76
8915.31 8998.07
8925.82 9008.58
8936.34 9019.10
8946.85 9029,61
Sperry-Sun Drilling Services
Proposal Report for U-O2A Wp2
FOR
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°nOOft) (ft)
Comment
5062.73 N 6103.80W 5965765.07 N
5075.36 N 6170.00W 5965776.55 N
5093.95 N 6267.41W 5965793.43N
5112.55 N 6364.83W 5965810.32 N
5131.14 N 6462.24W 5965827.20 N
5149.73N 6559.65W~ 5965844.08N
5168.32N 6657~(;l~'~k'~r5965860.97N
5175.69N 6,~~ 5965867.66N
5186.97N 17~W 5965877.90N
5197.00N ~BOW 5965887.01N
~ 6810.98W 5965887.65 N
6852.81W 5965894.96 N
6950.73W 5965912.06 N
7048.65W 5965929.17 N
7146.56W 5965946.27 N
5281.03 N 7244.48W 5965963.38 N
5299.86 N 7342.40W 5965980.48 N
5318.68 N 7440.31W 5965997.59 N
5321.84 N 7456.76W 5966000.46 N
6337.23 N 7538.45W 5966014.42 N
5341.00N 7559.00W 5966017,83 N
5355.12 N 7636.31W 5966030.59 N
5372,98 N 7734.14W 5966046,73 N
5390.84 N-~ 7831.97W 5966062.88 N
5408.70 N 7929.80W 5966079.02 N
625373.49 E 10.000 7802.53
625307.07 E 0.000 7866.42
625209.35 E 0.000 7960.42
625111.63 E 0.000 8054.43
625013.91E 0.000 8148.48
624916.19 E 0.000 8242.43
624818.47 E 0.000 8336.44
624779.75 E 0.000 8373.68
624720.45 E 10.000 8430.73
624667.75 E 10,000 8481.43
624664.05 E 10.000 8484.98
624622.09 E 0.000 8525.38
624523.86 E 0.000 8619.93
624425.62 E 0.000 8714.49
624327.39 E 0.000 8809.05
624229.16 E 0.000 8903.61
624130.93 E 0.000 8998,16
624032.70 E 0,000 9092.72
624016.21 E 0.000 9108.60
623934.25 E 10.000 9187,34
623913.64 E 10.000 9207.09
623836.09 E 0.000 9281.39
623737.96 E 0.000 9375.40
623639.84 E 0.000 9469.41
623541.71E 0.000 9563.42
End Dir, Sail @ 82.610° ! 14932.04ft MD, 8957.25ft TVD
Start Dir iD 10,000°/100fi: 15539.62ft MD, 9035.40ft TVD
aOntinue D r iD 10,000°/100ft: 15653 52ft MD, 9038.76ft TVD
rget: U-02A T2-1nt4, Geological '
End Dir, Sail iD 94.369°: 15657.28ft MD, 9038.49ft 1-VD
.,
Start Dir iD 10,000°/100fi: 16316.79ft MD, 8988.25ft TVD
j~nd D r, Sail iD 83.965° · 16420 97ft MD 8989.76ft TVD
arget: U-O2A T2-1nt5, G'eologlc~l ~, '
Continued.,.
July, 1998 - 15:27 - 4 - DrillQuest
erry- -un unlling Services
PRELIMINARY Proposal Report for U-O2A Wp2 ~O~
OUL ' '
--
Prudhoe Bay Unit Alaska State Plane Zone 4
PBU_WOA U Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) ,,.~) (ft) (ft) ("'/~ 00ft) (ft)
16867.99 83.965 280.347 8954.00 9036.76 5420.84.N ~a~,'~kg~-~JB1 W 5966090.00 N 623475.00 E 0.000 9627.33 Total Del3th: 16867.99lt MD. 9036.76ft TVD
4 1/2' I.iher
SJ~ Target: U-02A T2-2. Geological
..~.,
All
data
is
in
feet
unless otherwise stated. Directions and cooj,j~e
relative to True North.
Vertical depths are relative to Well. Northings and Easting~i~i~l~er~lative to Well.
The Dogleg Severity is in Degrees per lO0ft.
Vertical Section is from Well and calculated along al~u'th of 299.380° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16867.99ft.,
The Bottom Hole Displacement is 9660.56ft., in the Direction of 304.134° (True).
July, 1998 - 15:27 - 5 - DrillQuest
U-4 []
U-,.'l ·
~...
....
NOTES
2. REFEREhCE FIELD BOOK WOA-~3-21
(PGS. 44 THRU 45).
3. ALASKA STATE PLANE COORDINATES
ARE ZONE 4, ALASKA, NAD27;;::
::~ :.
[]U-6
[] U-11'
1.1-8
LEGEND
~ AS-BUILT WELL
. · EXISTING WELLS
[]
· U-lO
LOCATED W1THIN PROTRACTED:SEC. 19, T, 11 N., R. 1.3 E., U.M., AK.
WELL A.S.P. PLAN~'~ GEODETIC CELLAR SECTION
NO. COORDINATES COORDINATES POSITION BOX ELEV. OFFSETS
¥=5,960,569.07 N.1185.00 70'18'01.157" 1745' FEL
U-14- X= 632f258.4,_3 E.1710~4-2 148'55'q-.3.652" 46,9' 16' FNL
I 0 712193
REV. DATE
ORIGINAL AS-BUILT ISSUE-
'~ REV I S IONS
;,.
VICINITY MAP
N.T.S.
%~ ':' :' o ,:, o,~ ~, a oe°°~'
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OFDATE JUNE 28, 1993.
U PAD
CONDUCTOR AS-BUILT
WELL U-14
I°^'~: IDI~A~fll: CHECK: APPROVAL:
I I 7/2/95 I MINISH I ~F~,~INNE~ ~ 'let:
I 'l 1"~300' I I UPaDAB
)~AWNI CHECKI 'l / UPADAB , or1 I0
F. R. BELL & ASSOCIATES
ARCO Alaska Inc.
DRAWING N~:
, I I ,
· O0143066
VENDOR ALASKAST 1 4
I
DATE
INVOICE / CREDIT MEMO DESCRIPTION I GROSS I DISCOUNT I NET
092198 CK092 t 9S.'l,. i ~2-L~-. ~:-.:_ _ In.'-,.~,. 0r-..=.
HANDLIN~ INST' S/H CAROL ~ITHE'F ×41';,'$
*HE ATTACHED CHECK IS IN PAYMENT FOR fiEldS DESCRIBED ABOVE. ~e]llllr-~ll~ ~ i i'-',(-~ t"'". t*'"j i .~ .-'"~..---.
BP EXPLORATION (ALASKA), INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND. OHIO
56~389
No. H 143066
CONSOLIDATED COMMERCIAL ACCOUNT.,
412 OO14306&
PAY
To The
CT` d eT'
ONE HUNDRED ~ ******************************************* US DOLLAR
ALASKA STATE DEPT OF REVENUE
3001 PORCUPINE DR
ANCHORAGE
AK 99501-3120
DATE AMOUNT
09'/2i/98 $I00.
NOT VALID AFTER 120 DAYS
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRATION
ENGINEERING
GEOLOGY
COMPANY 6~,p
~'/~:~/~_5",,~' INIT CLASS
GEOL AREA
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from ddlling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate we,bore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ........ , ........
26. BOPE press rating appropriate; test to.,~ c.3 ~ pslg.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
y'~N
Y N
N
Y
Y
¥ N
Y N
Y N
Y N
Y N
¥ N
Y N
Y N
Y N
Y N
dev ~'~_ redrll~-~ serv~wellboreseg~
L
APPR DATE
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N /
31. Data presented on potential overpressure zones ....... Y N
32. Seismic analysis of shallow gas zones ............. Y
33. Seabed condition survey (if off-shore) .............
34. Contact name/phone for weekly progress reports [exploratory~ Y N
Y N
Y N
Y N
Y N
Y N
35. With proper cementing records, th_is plan
(A) will contain waste in a suita~receiving zone;
(B) will ~;~o~~ter; or cause drilling waste...
to sb~--e~, / ~
(C) will ~cal integrity of the w-'ell used for disposal;
(D) willD~age producing formation or impair recovery from a
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
ann. disposal para req .~
ON/OFF SHORE ~/'~
GEOLO~;~: ENGINF_.EI~.NG: UlC/A0n~a?
JDH-~-----'"--
COMMISSION:
DWJ ~
RNC ~'
co
Comments/Instructions:
c:\msoffice\wordian\diana\checklist
· WELL PERMIT CHECKLIST COMPANY <:~;) WELl_ NAME ~'~-~"'~/-~2_~
FIELD & POOL ....... _~_._...?__~./(.~D___
ADMINISTRATION
. INIT CLASS ,~,Z./' .,2-~::~..,;// GEOL AREA ~:'.~',,~:~
._
ENGINEERING
APPR DA'rE
GEOLOGY
APPI't [)A~f [:_ .,,
ANNUL,AB DISP___~OSAL
APPR DATE
1. Permit fee attached .......................
2. Lease number appropriate ...................
3 Unique well name and number .................
4 Well located in a defined pool ..................
5 Well located proper distance from drilling unit boundary. . .
6 Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unil ...........
8. If deviated, is wellbore plat included ...............
9. Operator only affected pady ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
14. Corlduclor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMl' vol adequate to circulate on conductor & surf csg .....
'17. CMI vol adequale to tie-in long string to surf csg ........
18. CM 1' will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill; has a ~10-403 for abandonment been approved.
22. Adequate wellbore separation proposed .............
23. If diveder required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequale .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to A'-E~,~) psig
27. Choke manifold complies w/APl RP-53~(May §4) ........
28. Work will occur without operation shutdown ...........
29.
"~ N
I N
'~ N
'~ N
'~ N
t N
t N
t N
t N
'~ N
'~ N
Y
Y N
d~u
PROGRAM: exp [] dev edrl erv [] wellbore seg II ann. disposal para req
_ UNIT// ../'.,,'/.~'~"<::::~ ON/OFF SHORE
_-
Is presence of H2S gas probable ................. <~ N
30. Pern,it can be issued w/o hydrogen sulfide measures ..... Y/~y i///~ ~ ii~".' .ii". iii"'i.' ...i.'".'. i .... '"' ii .. '.~
31. Data presented on potential overpressure zones .......
32 Seismic analysis of shallow gas zones. ' ¢ ...................
33 Seabed condition survey (if off-shore) .............
34 Contact nam, e/phon,e.for weekly progress reports ....... / Y N
[exploratory omy]
35. Wilh proper cementing rec~r,,ds, this plan
(A) will contain waste in a statable receivin~ ....... Y N
(R) will not contaminate fresh~,ter; o..~e drilling wasle... Y N
lo surface;
(C) wili nol impair mec~te~~4sed_J..q.r disposal; Y N
(1")) will not clan'mge.%pr-dSucir~g formation or' impair recovery from a Y N
pool;
(E) will nof'Cfrcumvent 20 AAC 25.252 or 20 ,A~C 25.412. Y N
Comments/Instructions'
_G E__0_t.__O__G._Y: ENGINEERING: U I C/AL~"f~ar COMMISSION:
JD~ ~ RNC ' -
co
M chekhsl mv (}5/2919H
dlf f: \iH';HIh~ ~\wf)H:linn\,'h;, H ~\, I~ ,, I h, I
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Aug 24 12:50:43 1999
Reel Header
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientif~ic~-
Technical Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-90047
C. ASUCHAK
D. ACKERMAN
U-02A
500292117001
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
24-AUG-99
MWD RUN 3
AK-MW-90047
C. ASUCHAK
D. ACKERMAN
MWD RUN 4
AK-MW-90047
C. ASUCPLAK
J. BOYD/K.WH
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 10
AK-MW-90047
J. PITCHER
K.WHITE
MWD RUN 11
AK-MW-90047
J. PITCHER
K.WHITE
MWD RUN 12
AK-MW-90047
J. PITCHER
K.WHITE
JOB NUMBER:
LOGGING ENGINEER:
MWD RUN 13
AK-MW-90047
J. PITCHER
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
K. WHITE
18
11
13E
237
2434
76.50
76.50
47.80
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 7.000 9879.0
PRODUCTION STRING 6.000 13429.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL WITH NATURAL GAMMA PROBE
(NGP) UTILIZING A
SCINTILLATION DETECTOR.
3. MWD RUN 2 IS DIRECTIONAL ONLY AND NOT PRESENTED.
4. MWD RUN 3 WAS DIRECTIONAL WITH NGP. THIS WELL KICKS
OFF FROM U-02 AT 9879'
MD, 8803'TVD.
5. MWD RUNS 4,AND 10-13 ARE DIRECTIONAL WITH DUAL GAMMA
RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4
(EWR4) . THE CHANGE FROM NGP TO DGR DETECTORS OCCURS AT
10089'MD, 8944'TVD.
6. THIS WELL KICKS OFF FROM U-02A PB1 AT 10260'MD,
8970'TVD.
7. DIGITAL MWD DATA IS SHIFTED TO THE PDC GR LOG OF
09/04/84 (LDT) .
8. MWD RUNS 1-4 AND 10-13 REPRESENT WELL U-02A WITH
API#: 50-029-21170-01.
THIS WELL REACHED A TOTAL DEPTH OF 13429'MD, 8971'TVD.
SROP = SMOOTHED R_ATE OF PENETRATION.
SGRD = SMOOTHED GAMMA RAY.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTtLA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 9695 0 13401.5
ROP 9730 5 13444.0
FET 10112 5 13408.5
RPD 10112 5 13408.5
RPM 10112 5 13408.5
RPS 10112 5 13408.5
RPX 10112 5 13408.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
9695.0
9705 0
9714
9718
9720
9730
9731
9737
9739
9741
9744
9747
9759
9762
9765
9770
9775
9779
9783
9796
9872
9874
9875
9876
GR
9676 0
9686 0
9697 0
9700 5
9702 5
9715 0
9716 0
9724 0
9726 0
9727 5
9730 5
9735 0
9746 5
9749 5
9752.0
9756 5
9762 0
9767 0
9770 5
9782 0
9857 0
9860 0
9861 0
9863 0
EQUIVALENT %/NSHIFTED DEPTH --
9879.5
9883.5
9889.0
13444.0
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
9865.5
9869.0
9874.0
13429.0
BIT RUN NO MERGE TOP
1
3
4
10
11
12
13
9715 0
9901 0
10152 0
10260 0
11809 0
11939 0
13151 0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
9901 0
10152 0
10260 0
11809 0
11939 0
13151 0
13429 0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT~H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First
Name Min Max Mean Nsam Reading
DEPT 9695 13444 11569.5 7499 9695
ROP 0.0661 2334.38 94.5347 7428 9730.5
GR 17.3708 874.69 53.4296 7414 9695
RPX 0.724 2000 7.30027 6593 10112.5
RPS 0.6974 28.1899 6.40052 6593 10112.5
RPM 0.404 38.1908 6.63167 6593 10112.5
RPD 1.3371 2000 7.59301 6593 10112.5
FET 0.224 78.0788 2.49812 6593 10112.5
Last
Reading
13444
13444
13401 5
13408 5
13408 5
13408 5
13408 5
13408 5
First Reading For Entire File .......... 9695
Last Reading For Entire File ........... 13444
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9676.0 9889.0
ROP 9715.0 9901.0
$
LOG HEADER DATA
DATE LOGGED: 26-DEC-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 9901.0
TOP LOG INTERVAL (FT) : 9715.0
BOTTOM LOG INTERVAL (FT) : 9901.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
MAXIMUM ANGLE: .0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
TOOL NUMBER
NGP SPC 46
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPER_ATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
MILLING FLUID
8.80
87.0
9.2
27000
8.6
.000
.000
.000
.000
27.3
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 API 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam .Reading
DEPT 9676 9901 9788.5 451 9676
GR 32.4232 212.648 67.1331 427 9676
ROP 2.304 929.883 54.455 373 9715
Last
Reading
9901
9889
9901
First Reading For Entire File .......... 9676
Last Reading For Entire File ........... 9901
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE N-UMBER: 3
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9889.5 10089.0
ROP 9901.5 10152.0
$
LOG HEADER DATA
DATE LOGGED: 28-DEC-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 10152.0
TOP LOG INTERVAL (FT) : 9904.0
BOTTOM LOG INTERVAL (FT) : 10152.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 30.8
MA~XIMUM ANGLE: 70.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
TOOL NUMBER
NGP SPC 278
BOREHOLE Ai~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPEP~ATURE (MT):
MUD AT M_AX CIRCULATING TERMPEP~ATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL ST~NDOFF (IN) :
EWR FREQUENCY (HZ):
REM3LRKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down~
Optical log depth units..~ ......... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
KCL POLYMER
8.70
48.0
8.5
29000
8.8
.000
.000
.000
.000
56.3
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 API 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9889.5 10152 10020.8 526 9889.5
GR 35.3863 874.69 166.088 400 9889.5
ROP 0.0661 374.484 86.3299 502 9901.5
Last
Reading
10152
10089
10152
First Reading For Entire File .......... 9889.5
Last Reading For Entire File ........... 10152
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
R_AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
FET
RPD
RPM
RPS
RPX
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
10089 5
10097 5
10097 5
10097 5
10097 5
10097 5
10152 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
STOP DEPTH
10260 0
10260 0
10260 0
10260 0
10260 0
10260 0
10260 0
30-DEC-98
ISC 5.07
DEPII 2.22A, SP4
~EMORY
10260.0
10152.0
10260.0
82.0
MAXIMUM ANGLE: 100.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REFLARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NLIMBER
Pll03GR4
Pll03GR4
6.000
6.0
QUICKDRILL
8.90
56.0
9.0
32000
6.0
.180
.086
.200
.120
72.7
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
FET MWD 4 HOUR 4 1 68 4 2
RPD MWD 4 OHMM 4 1 68 8 3
RPM MWD 4 OHMM 4 1 68 12 4
RPS MWD 4 OHMM 4 1 68 16 5
RPX MWD 4 OHMM 4 1 68 20 6
GR MWD 4 API 4 1 68 24 7
ROP MWD 4 FT/H 4 1 68 28 8
Name Min
DEPT 10089.5
FET 0.5369
RPD 4.2216
RPM 3.872
RPS 3.8131
RPX 3.3187
GR 18.9368
ROP 20.8825
Max
10260
18 2607
6 9221
7 0036
7 2609
6 4667
56 1132
1030.08
Mean Nsam
10174.8 342
6.53254 326
5.69678 326
5.48455 326
5.30984 326
4.67942 326
32.1718 342
118.744 216
First
Reading
10089.5
10097.5
10097.5
10097.5
10097.5
10097.5
10089.5
10152.5
Last
Reading
10260
10260
10260
10260
10260
10260
10260
10260
First Reading For Entire File .......... 10089.5
Last Reading For Entire File ........... 10260
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
R3IW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
10
.5000
START DEPTH
10260 5
10260 5
10260 5
10260 5
10260 5
10260 5
STOP DEPTH
11776.0
11776.0
11776.0
11776.0
11776.0
11769.0
ROP 10260.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
11809.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA P~AY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
25-JAN-99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
11809.0
10260.0
11809.0
81.4
97.7
TOOL NUMBER
P1043GR4
P1043GR4
6.000
6.0
FLOPRO
8.60
43.0
8.7
30000
7.5
· 195
.088
.140
.200
72.7
.6
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 10 FT/H 4 1 68 4 2
GR MWD 10 API 4 1 68 8 3
RPX MWD 10 OHMM 4 1 68 12 4
RPS MWD 10 OHMM 4 1 68 16 5
RPM MWD 10 OHMM 4 1 68 20 6
RPD MWD 10 OHMM 4 1 68 24 7
FET MWD 10 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Min
10260.5
5 4466
17 3708
1 4988
1 6122
1 7671
2 3229
0.224
Max Mean Nsam
11809 11034.8 3098
1619.16 90.9495 3098
141.786 39.1283 3018
15.3732 5.15955 3032
17.3827 5.75752 3032
18.2917 5.82902 3032
18.0745 6.15952 3032
78.0788 0.941982 3032
First
Reading
10260 5
10260 5
10260 5
10260 5
10260 5
10260 5
10260 5
10260 5
Last
Reading
11809
11809
11769
11776
11776
11776
11776
11776
First Reading For Entire File .......... 10260.5
Last Reading For Entire File ........... 11809
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files·
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
FET
RPD
RPM
RPS
RPX
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
11769 5
11776 5
11776 5
11776 5
11776 5
11776 5
11809 5
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11892.0
11899.0
11899.0
11899.0
11899.0
11899.0
11939.0
27-JA_N- 99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
11939.0
11809.0
11939.0
89·9
91.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
TOOL NUMBER
P1043GR4
P1043GR4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
6.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLOPRO
8.60
43.0
8.7
30000
7.5
· 195
.090
·140
.200
70.5
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 11 FT/H 4 1 68 4 2
GR MWD 11 API 4 1 68 8 3
FET MWD 11 HOUR 4 1 68 12 4
RPX MWD 11 OHMM 4 1 68 16 5
RPS MWD 11 OHMM 4 1 68 20 6
RPM MWD 11 OHMM 4 1 68 24 7
RPD MWD 11 OHMM 4 1 68 28 8
Name
DEPT
ROP
GR
FET
RPX
RPS
RPM
RPD
Min
11769.5
2 6568
31 4441
1 2236
3 0306
3 7205
3 9138
4 1806
Max
11939
304.102
51 1942
31 6273
5 9471
6 7973
6 7305
6 8245
Mean Nsam
11854.2 340
59.2991 260
39.8251 246
10.4733 246
4.33569 246
4.95222 246
5.13936 246
5.46633 246
First
Reading
11769 5
11809 5
11769 5
11776 5
11776 5
11776 5
11776 5
11776 5
Last
Reading
11939
11939
11892
11899
11899
11899
11899
11899
First Reading For Entire File .......... 11769.5
Last Reading For Entire File ........... 11939
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NLTMBER: 7
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11892.5
FET 11899 5
RPD 11899 5
RPM 11899 5
RPS 11899 5
RPX 11899 5
ROP 11939 5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
STOP DEPTH
13111.0
13118.0
13118.0
13118.0
13118.0
13118.0
13151.0
30-JAN-99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
13151.0
11939.0
13151.0
84.0
93.5
TOOL NUMBER
P1043GR4
P1043GR4
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical lo9 depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
FLOPRO
8.90
58.0
8.5
5.8
.130
.052
.150
.110
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 12 FT/H 4 1 68 4 2
GR MWD 12 API 4 1 68 8 3
RPX MWD 12 OHMM 4 1 68 12 4
RPS MWD 12 OHMM 4 1 68 16 5
RPM MWD 12 OHMM 4 1 68 20 6
RPD MWD 12 OHMM 4 1 68 24 7
FET MWD 12 HOUR 4 1 68 28 8
77.3
First
Name Min Max Mean Nsam Reading
DEPT 11892.5 13151 12521.8 2518 11892.5
ROP 7.3814 2257.36 99.42 2424 11939.5
GR 27.3755 562.846 57.2841 2438 11892.5
RPX 0.724 2000 10.8819 2438 11899.5
Last
Reading
13151
13151
13111
13118
RPS 0.6974 28.1899 7.37931 2438
RPM 0.404 38.1908 7.88728 2438
RPD 1.3371 2000 9.98342 2438
FET 0.3716 41.6954 2.13328 2438
11899.5
11899.5
11899.5
11899.5
13118
13118
13118
13118
First Reading For Entire File .......... 11892.5
Last Reading For Entire File ........... 13151
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 13111 5 13386.5
FET 13118 5 13393.5
RPD 13118 5 13393.5
RPM 13118 5 13393.5
RPS 13118 5 13393.5
RPX 13118 5 13393.5
ROP 13151 5 13429.0
$
LOG HEADER DATA
DATE LOGGED: 01-FEB-99
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPEP~ATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MEMORY
13429.0
13150.0
13429.0
83.7
84.5
TOOL NUMBER
P1043GR4
P1043GR4
6.000
6.0
FLOPRO
8.60
39.0
8.5
19000
6.0
.200
.098
.320
.220
65.6
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 13
GR MWD 13
FET MWD 13
RPX MWD 13
RPS MWD 13
RPM MWD 13
RPD MWD 13
FT/H 4 1 68
API 4 1 68
HOUR 4 1 68
OHMM 4 1 68
OHMM 4 1 68
OHMM 4 1 68
OHMM 4 1 68
4
8
12
16
20
24
28
Name
DEPT
ROP
GR
FET
RPX
RPS
RPM
RPD
Min
13111.5
25 3799
18 0879
0 4582
2 7384
2 9358
2 9082
3 0007
Max Mean Nsam
13429 13270.2 636
2334.38 134.416 556
95.0376 41.4448 551
41.6334 6.7279 551
12.3082 6.10677 551
24.9596 6.89986 551
26.647 6.83762 551
19.794 6.97562 551
First
Reading
13111 5
13151 5
13111 5
13118 5
13118 5
13118 5
13118 5
13118 5
Last
Reading
13429
13429
13386 5
13393 5
13393 5
13393 5
13393 5
13393 5
First Reading For Entire File .......... 13111.5
Last Reading For Entire File ........... 13429
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Aug 24 11:59:01 1999
Reel Header
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW- 90047
C. ASUCHAK
D. ACKERMAN
U-02A PB1
500292117070
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
24-AUG-99
MWD RUN 3
AK-MW- 90047
C. ASUCHAK
D. ACKERMA/~
MWD RUN 4
AK-MW-90047
C. ASUCHAK
J. BOYD/K.WH
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
AK-MW-90047
C. ASUCHAK
J. BOYD/K.WH
MWD RUN 6
AK-MW- 90047
C. ASUCHAK
J. BOYD/K.WH
MWD RUN 7
AK-MW-90047
C. ASUCHAK
G. KIDD
JOB NUMBER:
LOGGING ENGINEER:
MWD RUN 8
AK-MW-90047
C. ASUCHAK
OPERATOR WITNESS: G. KIDD
SURFACE LOCATION
SECTION: 18
TOWNSHIP: 11
RANGE: 13E
FNL:
FSL: 237
FEL: 2434
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING: 76.50
DERRICK FLOOR: 76.50
GROUND LEVEL: 47.80
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 7.000 9879.0
PRODUCTION STRING 6.000 15628.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. THIS WELL KICKS OF FROM U-02 AT 9879'MD, 8803'TVD.
3. MWD RUN 1 IS DIRECTIONAL WITH NATURAL GAMMA PROBE
(NGP) UTILIZING
A SCINTILLATION DETECTOR.
4. MWD RUN 2 IS DIRECTIONAL ONLY AND IS NOT PRESENTED.
5. MWD RUN 3 IS DIRECTIONAL WITH NGP.
6. MWD RUNS 4-8 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-
MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4 (EWR4) .
THE CHANGE FROM NGP TO DGR DETECTORS OCCURS AT 10089'MD,
8944'TVD.
7. GAMMA RAY DATA ENDS AT 15399'MD, 9004'TVD DUE TO
TOOL FAILURE.
8. DIGITAL MWD DATA IS DEPTH SHIFTED TO THE LDT-GR PDC
LOG OF 09/04/84.
9. MWD RUNS 1 THRU 8 REPRESENT U-02A DB1 WITH API#:
50-029-21170-01.
THIS WELL REACHED A TOTAL DEPTH OF 15628'MD, 9025'TVD.
SROP = SMOOTHED RATE OF PENETRATION.
SGRD = SMOOTHED GAMMA RAY.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME RESISTIVITY
SENSOR.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 9695 0 15413.5
ROP 9730 5 15641.5
FET 10112 5 15547.5
RPD 10112 5 15547.5
RPM 10112 5 15547.5
RPS 10112 5 15547.5
RPX 10112 5 15547.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
9695.0
9705.0
9714.0
9718.5
9720 5
9730 5
9731 5
9737 5
9739 5
9741 5
9744 5
9747 5
9759 5
9765.5
9770 0
9775 0
9779 5
9782 0
9783 0
9796 0
9872 0
9874 0
9875 0
9876 5
GR
9676 0
9686 0
9697 0
9700 5
9702 5
9715 0
9716 0
9724.0
9726.0
9727.5
9730.5
9735.0
9746.5
9752.0
9756.5
9762.0
9767.0
9769.5
9770 5
9782 0
9857 0
9860 0
9861 0
9863 0
EQUIVALENT UNSHIFTED DEPTH
9879.5 9865.5
9883.5 9869.0
9889.0 9874.0
9892.5 9877.5
15641.5 15626.5
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO
MWD 1
MWD 3
MWD 4
MWD 5
MWD 6
MWD 7
MWD 8
$
REMARKS: MERGED MAIN PASS.
$
MERGE TOP
9715.0
9901.0
10152.0
11491.0
12541.0
13991.0
15385.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
9901 0
10152 0
11491 0
12541 0
13991 0
15385 0
15568 0
Name Service Order Units Size Nsam
DEPT FT 4 1
ROP MWD FT/H 4 1
GR MWD API 4 1
RPX MWD OHMM 4 1
RPS MWD OHMM 4 1
RPM MWD OHMM 4 1
RPD MWD OHMM 4 1
FET MWD HOUR 4 1
Rep Code Offset Channel
68 0 1
68 4 2
68 8 3
68 12 4
68 16 5
68 20 6
68 24 7
68 28 8
Name Min Max Mean
DEPT 9695 15641.5 12668.2
ROP 0.0661 2506.64 107.411
GR 15.054 874.69 44.6001
RPX 0.384 217.171 7.10409
RPS 0.405 93.8393 8.6243
RPM 0.3771 2000 9.44867
RPD 0.4508 2000 11.5483
FET 0.2064 35.0189 1.69716
First Last
Nsam Reading Reading
11894 9695 15641.5
11823 9730.5 15641.5
11438 9695 15413.5
10871 10112.5 15547.5
10871 10112.5 15547.5
10871 10112.5 15547.5
10871 10112.5 15547.5
10871 10112.5 15547.5
First Reading For Entire File .......... 9695
Last Reading For Entire File ........... 15641.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE N-UMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMFLARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9676.0 9889.0
ROP 9715.0 9901.0
$
LOG HEADER DATA
DATE LOGGED: 26-DEC-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWN-HOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 9901.0
TOP LOG INTERVAL (FT) : 9715.0
BOTTOM LOG INTERVAL (FT) : 9901.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
MAXIMUM ANGLE: .0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
NGP
$
NATLULm_L GAMMA PROBE
BOREHOLE AlqD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA/qDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
NGP SPC 46
6.000
6.0
MILLING FLUID
8.80
87.0
9.2
27000
8.6
.000
.000
.000
.000
27.3
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 1 FT/H 4 1 68 4 2
GR MWD 1 API 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9676 9901 9788.5 451 9676
ROP 2.304 929.883 54.455 373 9715
GR 32.4232 212.648 67.1331 427 9676
Last
Reading
9901
9901
9889
First Reading For Entire File .......... 9676
Last Reading For Entire File ........... 9901
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NLIMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9889.5 10089.0
ROP 9901.5 10152.0
$
LOG HEADER DATA
DATE LOGGED: 28-DEC-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWN-HOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 10152.0
TOP LOG INTERVAL (FT) : 9904.0
BOTTOM LOG INTERVAL (FT) : 10152.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 30.8
MAXIMUM ANGLE: 70.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
NGP
$
NATURAL GAMMA PROBE
BOREHOLE ~ CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units; ......................
Datum Specification Block sub-type...0
NGP SPC 278
6.000
6.0
KCL POLYMER
8.7O
48.0
8.5
29000
8.8
.000
.000
.000
.000
56.3
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 3 FT/H 4 1 68 4 2
GR MWD 3 API 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9889.5 10152 10020.8 526 9889.5
ROP 0.0661 374.484 86.3299 502 9901.5
GR 35.3863 874.69 166.088 400 9889.5
Last
Reading
10152
10152
10089
First Reading For Entire File .......... 9889.5
Last Reading For Entire File ........... 10152
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in. separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10089.5 11448.0
FET 10097.5 11455.0
RPD 10097.5 11455.0
RPM 10097.5 11455.0
RPS 10097.5 11455.0
RPX 10097.5 11455.0
ROP 10152.5 11491.0
$
LOG HEADER DATA
DATE LOGGED: 30-DEC-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 11491.2
TOP LOG INTERVAL (FT) : 10152 . 0
BOTTOM LOG INTERVAL (FT) : 11491.2
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MIlD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
82.0
100.4
TOOL NI/MBER
Pll03GR4
Pll03GR4
6.000
6.0
QUICKDRILL
8.90
56.0
9.0
32000
6.0
.180
.086
.200
.120
72.7
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 4 FT/H 4 1 68 4 2
GR MWD 4 API 4 1 68 8 3
RPX MWD 4 0HMM 4 1 68 12 4
RPS MWD 4 OHMM 4 1 68 16 5
RPM MWD 4 OHMM 4 1 68 20 6
RPD MWD 4 OHMM 4 1 68 24 7
FET MWD 4 HOUR 4 1 68
28
Name Min Max Mean Nsam
DEPT 10089.5 11491 10790.2 2804
ROP 6.6435 1601.63 116.825 2678
GR 16.061 137.415 39.5471 2718
RPX 0.384 13.7774 5.48568 2716
RPS 0.405 15.0671 6.0356 2716
RPM 0.3771 13.6442 6.03226 2716
RPD 0.4508 12.1228 6.16848 2716
FET 0.2071 18.2607 1.4496 2716
First
Reading
10089 5
10152 5
10089 5
10097 5
10097 5
10097 5
10097 5
10097 5
Last
Reading
11491
11491
11448
11455
11455
11455
11455
11455
First Reading For Entire File .......... 10089.5
Last Reading For Entire File ........... 11491
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name .......... iSTSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
R_AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11448.5
FET 11455.5
RPD 11455.5
RPM 11455.5
RPS 11455.5
STOP DEPTH
12498.0
12505.0
12505.0
12505.0
12505.0
RPX 11455.5
ROP 11491.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
12505.0
12541.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AATD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MLTD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
01-JAN-99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
12541.0
11491.0
12541.0
79.9
96.1
TOOL NLTMBER
Pll03GR4
Pll03GR4
6.000
6.0
QUICKDRILL
8.90
56.0
9.0
32000
6.0
.220
.087
· 160
.150
75.0
.6
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Name Service Order Units Size Nsam
FT 4 1
MWD 5 FT/H 4 1
MWD 5 API 4 1
MWD 5 OHMM 4 1
MWD 5 OHMM 4 1
MWD 5 OHMM 4 1
MWD 5 OHMM 4 1
MWD 5 HOUR 4 I
Rep Code Offset Channel
68 0 1
68 4 2
68 8 3
68 12 4
68 16 5
68 20 6
68 24 7
68 28 8
Name Min Max Mean
DEPT 11448.5 12541 11994.8
ROP 6.4914 913.456 103.942
GR 15.8573 133.018 39.7743
RPX 0.8121 14.0931 6.58387
RPS 0.7973 14.9947 7.38917
RPM 0.8251 15.6272 7.3705
RPD 0.6931 94.7451 7.61924
FET 0.255 20.5547 1.46198
First Last
Nsam Reading Reading
2186 11448.5 12541
2100 '11491.5 12541
2100 11448.5 12498
2100 11455.5 12505
2100 11455.5 12505
2100 11455.5 12505
2100 11455.5 12505
2100 11455.5 12505
First Reading For Entire File .......... 11448.5
Last Reading For Entire File ........... 12541
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
FET
RPD
RPM
RPS
RPX
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
12498 5
12505 5
12505 5
12505 5
12505 5
12505 5
12541 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
STOP DEPTH
13958 0
13960 0
13960 0
13960 0
13960 0
13960 0
13991 0
04 -JAN- 99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
13991.0
12541.0
13991.0
80.0
99.0
TOOL NUMBER
Pl103GR4
Pll03GR4
6.000
6.0
QUICK]DRILL
9.00
51.0
8.5
32000
6.2
.110
.056
.240
.300
84.4
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 6 FT/H 4 1 68 4 2
GR MWD 6 API 4 1 68 8 3
RPX MWD 6 OHMM 4 1 68 12 4
RPS MWD 6 OHMM 4 1 68 16 5
RPM MWD 6 OHMM 4 1 68 20 6
RPD MWD 6 OHMM 4 1 68 24 7
FET MWD 6 HOUR 4 1 68 28 8
Name Min Max Mean Nsam
DEPT 12498.5 13991 13244.8 2986
ROP 5.6352 2506.64 138.774 2900
GR 15.054 142.325 38.5185 2920
RPX 1.7558 217.171 7.46308 2910
RPS 2.0352 93.8393 8.9687 2910
RPM 2.0398 90.909 9.6401 2910
RPD 2.5631 2000 15.8585 2910
FET 0.2064 25.06 1.35559 2910
First
Reading
12498 5
12541 5
12498 5
12505 5
12505 5
12505 5
12505 5
12505 5
Last
Reading
13991
13991
13958
13960
13960
13960
13960
13960
First Reading For Entire File .......... 12498.5
Last Reading For Entire File ........... 13991
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEAJDER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
FET
RPD
RPM
RPS
RPX
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
13958 5
13960 5
13960 5
13960 5
13960 5
13960 5
13991 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
15343.0
15350.0
15350.0
15350.0
15350.0
15350.0
15385.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA P~AY
EWR4 ELECTROMAG. RESIS. 4
$
07-JAN-99
ISC 5.07
DEPII 2.22A, SP4
MEMORY
15385.0
13991.0
15385.0
82.9
97.1
TOOL N-UMBER
Pl168GR4
Pl168GR4
BOREHOLE ~2W-D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPEP~ATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Lo99in9 Direction ................. Down
Optical lo9 depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacin9 ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
QUICK/DRILL
8.70
46.0
8.0
6.0
.170
.084
.400
.150
.6
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD 7 FT/H 4 1 68
GR MWD 7 API 4 1 68
RPX MWD 7 OHMM 4 1 68
RPS MWD 7 OHMM 4 1 68
RPM MWD 7 OHMM 4 1 68
RPD MWD 7 OHMM 4 1 68
FET MWD 7 HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
88.9
Name Min Max Mean
DEPT 13958.5 15385 14671.8
ROP 6.0811 1646.19 80.3854
GR 18.2978 182.208 39.1175
First Last
Nsam Readin9 Readin9
2854 13958.5 15385
2788 13991.5 15385
2770 13958.5 15343
RPX 0.4406 21.0969 8.80972 2780
RPS 0.4709 53.9158 11.7729 2780
RPM 0.4597 2000 14.1834 2780
RPD 0.6701 2000 15.4467 2780
FET 0.3507 35.0189 1.81306 2780
13960.5
13960.5
13960.5
13960.5
13960.5
15350
15350
15350
15350
15350
First Reading For Entire File .......... 13958.5
Last Reading For Entire File ........... 15385
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 15343 5 15398.5
FET 15350 5 15532.5
RPD 15350 5 15532.5
RPM 15350 5 15532.5
RPS 15350 5 15532.5
RPX 15350 5 15532.5
ROP 15385 5 15568.0
$
LOG HEADER DATA
DATE LOGGED: 09-JAN-99
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4
5.16,NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA P~AY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MI/D AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MEMORY
15568.0
15385.0
15568.0
83.9
85.4
TOOL NUMBER
Pl168GR4
Pl168GR4
6.000
6.0
QUICKDRILL
8.70
54.0
8.5
30000
7.0
.170
.084
.400
.150
91.1
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68
ROP MWD 8 FT/H 4 1 68
GR MWD 8 API 4 1 68
RPX MWD 8 OHMM 4 1 68
RPS MWD 8 OHMM 4 1 68
RPM MWD 8 OHMM 4 1 68
RPD MWD 8 OHMM 4 1 68
FET MWD 8 HOUR 4 1 68
0
4
8
12
16
20
24
28
Name Min Max Mean Nsam
DEPT 15343.5 15568 15455.8 450
ROP 7.7565 1648.09 102.608 366
GR 22.2459 56.3658 31.9627 111
RPX 2.7567 11.3462 6.28695 365
RPS 3.9361 13.9533 8.26661 365
RPM 5.6614 13.8855 9.23959 365
RPD 7.507 13.0967 10.13 365
FET 0.5645 30.473 6.73285 365
First
Reading
15343.5
15385.5
15343.5
15350.5
15350.5
15350.5
15350.5
15350.5
Last
Reading
15568
15568
15398 5
15532 5
15532 5
15532 5
15532 5
15532 5
First Reading For Entire File .......... 15343.5
Last Reading For Entire File ........... 15568
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/08/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 99/08/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Scientific
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File