Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-2391a. Well Status: GINJ …… Oil ……1b. Well Class: 5 Exploratory … Service … Hilcorp North Slope, LLC 14. Permit to Drill Number/Sundry 198-239 12/28/1998 2/1/1999 GL PRUDHOE BAY, PRUDHOE OIL 4a. Surface: Top of Productive Interval: Total Depth: 237' FSL, 2434' FEL, SEC. 18, T11N, R13E, UM 2744' FSL, 235' FEL, SEC. 13, T11N, R12E, UM 4918'FSL, 2556'FEL, SEC. 13, T11N, R12E, U Surface: x- y- Zone -631565 5960810 ASP4 11. …Gas SPLUG …5Abandoned 20AAC 25.105 Suspended 20AAC 25.110 … WINJ …WAG …WDSPL …No. of Completions: 10/24/2020 15. 50-029-21170-01-00 16. PBU U-02A Well Name and Number: Surface / Surface 47.46 17. TPI:y- Zone -628773 ASP4x-5963269 Total Depth: x-y-Zone -626414 ASP45965402 13429 / 8971 none DNR Approval Number:19. 89-046 5. Directional or Inclination Survey: Yes No Submit electronic and printed information per 20 AAC 25.050 (ft MSL) 20.Thickness of Permafrost MD/TVD: CCL, MWD, DIP, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, aP, MRES, Sonic CASING WT. PER FT.GRADE SETTING DEPTH MD TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED Location of Well (Governmental Section): Field/Pool(s): Date Comp., Susp., or Aband.:6. Total Depth (MD/TVD): CASING, LINER AND CEMENTING RECORD TOP BOTTOM 22. SETTING DEPTH TVD 9-5/8" 7" 7" 72# 47# 26# 26# L-80 L-80 L-80 L-80 Surface Surface 2965' 9607' 9863' 9606' 9879' Surface Surface 2965' 8564' 8789' 8563' 8803' 8-1/2" Scab Liner 12-1/4" 8 cu yds Concrete 2095 cu ft Class 'G', 285 cu ft Permafrost 1028 cu ft Class 'G' 270 cu ft Class 'G' 25. GRADE PACKER SET (MD/TVD) 26. 4-1/2" 12.6# L-80 9834' DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED PRODUCTION TEST27. Date First Production: N/A Date of Test: Flow Tubing Press Oil-Bbl: Oil-Bbl: Gas-MCF:Water-Bbl: Oil Gravity - API (corr): Method of Operation (Flowing, gas lift, etc.): Gas-Oil Ratio:Choke Size: Water-Bbl: See attached Open to production or injection?Yes …No 524. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 110'36"20"x30" 13-3/8"Surface 2672'17-1/2"3720 cu ft Permafrost 'E' & IISurface2672' 9531' / 8498' Gas-MCF: Production for Test Period Calculated 24 Hour Rate Hours Tested: Casing Press: 110' ACID, FRACTURE, CEMENT SQUEEZE, ETC. TUBING RECORD DEPTH SET (MD) Yes …No 5Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed information ADL 047451 319-201 Other … 12. SSSV Depth (MD/TVD): … Ref Elevations BF Surface (attached)… KB Form 10-407 Revised 3/2020 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Development Stratigraphic Test 2.Operator Name: 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7. Date Spudded: 8. Date TD Reached: 9. 10. Plug Back Depth(MD/TVD): 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 76.54 Water Depth, if Offshore:13. n/a 0 API Number: Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 23. 18.Property Designation: 21.Re-drill/Lateral Top Window MD/TVD: 9879 / 8803 1900 (approx) 5 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 9:25 am, Nov 12, 2020 & ADL028283 RBDMS HEW 11/16/2020 Abandonment Date 10/24/2020 HEW xG DSR-11/17/2020DLB 11/16/2020 MGR24DEC2020 If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost - Base Formation at total depth: Contact Name:Aras Worthington Contact Email: aras.worthington@hilcorp.com Authorized Name:Stan Golis Authorized Title:Operations Manager Authorized Signature with Date:Contact Phone:(907)564-4763 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. 9869 9904 9963 9988 10026 8795 8825 8873 8891 8915 Sag River Shublik Shublik 'B' Shublik 'C' Sadlerochit Zone 4 Sadlerochit Zone 4 28.CORE DATA Conventional Core(s) Yes …No 5 Sidewall Cores Yes …No 5 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. Well Tested? Yes … 10026 8915 Top of Productive Interval 10026 8915 Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered): NAME MD TVD Permafrost - Top No 5 31. Daily Operations Summary, Wellbore Schematic, Well photosList of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.11.11 10:52:23 - 09'00' Stan Golis ABANDONED ALL STRINGS CUT 3'8" BELOW TUNDRA ELEV. CEMENTED TO SURFACE & MARKER CAP WELDED ON 10/24/20 Tbg tag TOC 3034' SLM cemented Estimated TOC behind 7" scab 5700' MD WELL NAME: U-02A 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 2081 Pull Plug 9540 - 9545 Tubing Punch 9508 14-bbls Class G Cement 9490 Set 4-1/2" cement retainer 9471 - 9476 Tubing Punch 3034 - 9480 283-bbls Class G Cement 2147 - 3034 66-bbls Class G Cement 1300 - 1310 Tubing / Casing Punch 557 145-bbls Class G Cement 539 - 547 Tubing / Casing Punch Surface 54-bbls Arctic Set 1 cement Surface 2-gallons Arctic Set 1 cement ACTIVITY DATE SUMMARY 12/10/2019 ***WELL SHUT IN ON ARRIVAL*** (P&A) PULLED 4-1/2" XX PLUG FROM SVLN @ 2,081' MD RAN 3.70" CENT., 3" S-BAILER & SAT DOWN @ 7,042' SLM (recovered clay-like mud) ***WELL LEFT SHUT IN, PAD-OP NOTIFIED*** 12/23/2019 CTU #9. 1.75" Coil Objective: Plug & Abandon Standby for SLB safety stand down. MIRU ...In progress... 12/24/2019 CTU #9. 1.75" Coil ***Continue from 12/23/19*** Objective: Plug & Abandon Complete BOP swap. Begin weather standby for -40* ...Incomplete... 12/27/2019 LRS Unit #72: Assist CTU #9 Heat two UR tanks to 130* F. ***JOB COMPLETE ON 27-DEC-2019*** 12/28/2019 LRS Unit #46 Assist CTU Heat Upright. Heated Upright #004 to 130*F. 12/29/2019 LRS unit 46 assist CTU heat Diesel Transport. Road unit to location/PJSM/RU to Diesel transport. *** WSR continued on 12/30/19*** 12/29/2019 CTU #9. 1.75" Coil Objective: Plug & Abandon Finish rigging up. MU & RIH w/ 1.75" JSN. Tag hard fill at 7200'. ***In Progress*** 12/30/2019 CTU #9. 1.75" Coil Objective: Plug & Abandon Clean out to 9900', chase returns out of hole. MU & RIH w/ HES GR/CCL logging tools and 3" JSN. Tag high at 9600', jet down to 9650'. Order out gel and clean out down to 9887' (corrected depth of 9893'). Was hard fill from 9823' down, had to work slowly. 9887' was a hard bottom unable to jet through. Log up from compression ***In Progress*** 12/30/2019 *** WSR continued from 12/29/19*** LRS unit 46 assist CTU heat Diesel Transport. (PLUG AND ABANDONMENT) Heated Disel transport to 90*, CTU notified upon LRS departure. 12/31/2019 CTU #9. 1.75" Coil ***Continue from 12/30/19*** Objective: Plug & Abandon Painted BLUE FLAG @ 9400', log up to 9300'. POOH. Confirm good data, (+13' correction, correlated to tubing tally dated 4-Feb-99). MU & RIH w/ 5' loaded tubing punch on a swivel. Punch tubing at 9540' - 9545'. POOH. Confirm shots fired, ball recovered. MU & RIH w/ 2" BDJSN. Circulate diesel to surface from 4500'. Continue RIH. Correct to nozzle at blue flag, RIH at tag TD at 9893'. Pick up 10' and lay 14 bbls of 15.8 ppg Class G cement from TD. Pick up to safety at 9000', squeeze 1 bbl. Clean out with Powervis to 9500'. Estimated TOC = 9500'. POOH chasing at 80% all the way to surface, jet jewelry along the way. Lay in 60/40 from 2500' to freeze protect well and coil. RDMO. ***Job Incomplete*** Daily Report of Well Operations PBU U-02A Daily Report of Well Operations PBU U-02A 1/4/2020 CTU #9 1.75" coil MIRU **In Progress** 1/7/2020 CTU #9 / 1.75" coil Job Objective: P & A BOP Test *** Continued on 1/8/2020 *** 1/8/2020 CTU #9 / 1.75" coil Job Objective: P & A Weekly BOP Test. MU & RIH w/ 3.65" JSN. Tag TOC at 9508' MD. AOGCC witnessed. POOH. MU and RIH with 4-1/2" one-trip cement retainer. Correct depth at flag and set retainer at 9490'. Perform state witnessed MIT-T test below cement retainer. Target pressure = 2500 psi. Pressure coil to 3095 psi with 0.3 bbls 60/40 Meth. MIT-T lost 226 psi in 1st 15 min and 72 psi in 2nd 15 min for a total of 298 psi in 30 mins. Final pressures 2797 / 153 / 18. POOH. *** Continued on 1/9/2020 *** 1/8/2020 LRS unit 46 assist CTU heat Uprights (PLUG AND ABANDONMENT) Heat 2 uprights of 9.8 brine to 120 degrees Heat one upright of 1% KCL to 120 degrees *** WSR continued on 01/09/20 *** 1/9/2020 CTU #9 / 1.75" coil Job Objective: P & A MU and RIH with SLB 1-11/16" x 5' tubing punch. Tag top of cement retainer and correct to bottom shot. Punch tubing from 9471' - 9476'. POOH. Shots fired and ball recovered. Make up 2.50" BDJSN cementing BHA and RIH. *** In Progress *** 1/9/2020 *** WSR continued from 01/08/20*** Rigged down and freeze protected equipment 1/10/2020 CTU #9 1.75" Coil Job Objective: P & A With coil parked at 9480', pump 134 bbl surfactant pill down coil, take returns out both tubing and IA. Circulate 9.8# brine down coil and start to lose returns after pumping 186 bbls.Unable to maintain returns as PC leak at 3170' was overbalanced. Lay in cement from 9480' to PC leak at 3170 with choke closed taking returns to formation at PC leak. Open choke and still unable to maintain returns from IA. Attempt to squeeze off PC leak with remainaing cement while leaving tubing leak at 2960' open as a circulation path for 9.8 ppg brine. Unable to obtain squeeze and current cement top estimated as 3170' in the IA (PC leak) and ~3000' in the tubing (~40' below tubing leak). Pump 178 bbls of 9.8# brine down IA and freeze protect top 200' with 60/40. Pump 48 bbls of 9.8# brine down tubing and freeze protect top 200' with 60/40. Start RD. *** In Progress *** 1/11/2020 CTU #9 1.75" coil Job Objective: P & A RDMO ***Job Complete*** 1/13/2020 T/I/O = VAC/VAC/10. Temp = SI. IA FL (pre CMIT). No AL or Flowline. TBG FL inconclusive. IA FL @ 390' (21 bbls). SV, WV, SSV = C. MV = O. IA, OA = OTG. 10:30 Daily Report of Well Operations PBU U-02A 1/15/2020 T/I/O= -21/-3/4 Temp= S/I CMIT-TxIA Fail unable to achieve psi, Max Applied Pressure- 2750 psi, Target Pressure- 2500 psi (PLUG AND ABANDONMENT) Pumped 43 bbls of amb 60/40 down IA slight TxIA communication unable to achieve test psi . Notified FB WSL Job ended. Notified Pad OP. Hang tags FWHP's = - 20/17/6 SV,SSV,WV=C MV=O IAxO= OTG upon departure 4/8/2020 ***WELL S/I ON ARRIVAL*** (p&a) RAN 3" S. BAILER & TAGGED TOC AT 3,034' SLM **WELL S/I ON DEPARTURE*** 4/12/2020 T/I/O = LOTO/Vac/0+. Temp = SI. IA FL (Fullbore). No flowline. IA FL @ 190' (10.2 bbls). SV, WV, SSV, MV(LOTO) = C. IA, OA = OTG. 02:00. 4/13/2020 T/I/O= 0/0/0. LRS unit 72 Injectivity test. (PLUG AND ABANDONMENT) Pumped 25 bbls of 60/40 Meoh into the TBG at 5 bpm and 350 psi. Bled back 2 bbls to final T/I/O= 0/0/0. WFO notified of status upon departure. SV, SSV, WV closed. MV open. IA/OA OTG. 4/20/2020 T/I/O= 0/0/0. LRS Unit 46 Circ out (PLUG AND ABANDONMENT) No flowline attached. Pumped 5 bbls 60/40 Meoh and 205 bbls 9.8 Brine into TBG taking returns up the IA to the Open Top. Open top final fluid level of 200 bbls. Pumped 3 bbls 60/40 into TBG for FP. Pumped 8 bbls into IA for FP. Pumped 2 bbls 60/40 into hard line to Open Top to FP hard line. Tags hung. AFE sign hung. DSO notified upon departure. FWHP's = 116/107/11 4/27/2020 LRS Unit 46 Heat upright to 90*. *** job continued to 04/28/2020 *** 4/28/2020 ...Continued from 04/27/2020... LRS Unit 46 (PLUG AND ABANDONMENT) Heat Upright to 90*. Pumped 50 bbls 9.8 Bine to 90*. Pad Operator notified upon departure. 4/28/2020 SLB Pumping Crew - Job Scope: Cement P&A through TBG leak @ 2960' MD and production casing leak @ 3170' MD RU to circulate down the TBG taking returns from the IA. Pumped 10 bbl spear of 60/40 methanol, 10bbl fresh water spacer, 66 bbls of 15.8 ppg class G cement, 2 bbl fresh water spacer. Shut down line up to launch 7" foam ball, Displace ball with 25 bbls 9.8 brine, 3 bbls 60/40 Methanol.. Shut down and line up down IA with 10 bbls fof 60/40 Methanol pushing cement throuigh leak points in production casing @ 3170' and possibly 2955'. Shut down and line up down TBG and pump 3 bbls of 60/40. Tags hung on master and IA. Pad Op notified/status of well. ***Job Complete*** Foam Ball @ 2037' MD TOC in TBG = 2194' MD TOC in IA = 2007' MD 5/3/2020 T/I/O= Temp= SI (LRS Unit 70: Pre-AOGCC CMIT-TxIA) Pressured up TxIA with 5 bbls of 60/40 and monitored pressure for stabilization for CMIT-TxIA ...Continued on 05/04/2020... 5/4/2020 ...Continued from 05/03/2020...(cmit P&A) CMIT-TxIA to 2552/2540 psi ***PASSED*** Target = 2500 psi - Max Applied= 2750 psi. Pumped 5.1 total bbls of 60/40 down TxIA to achieve a test pressure of 2591/2578 psi - 1st 15 minute loss of 20/20 psi, 2nd 15 minute loss of 19/18 psi, for a total loss of 39/38 psi in 30 minutes - Bled TxIA to 0/0 psi - Bled back ~1.5 bbls. Valve Positions on departure - SV, WV, SSV= Closed - MV= Open - CVs OTG - Tags hung on SV/IA. Final WHPs= 0/0/0. ***Job Complete*** Daily Report of Well Operations PBU U-02A 5/7/2020 ***WELL S/I ON ARRIVAL***(P&A) DRIFTED TBG W/ 11' x 2-1/2" DUMMY GUNS(2.66" rings) & 2.50" SAMPLE BAILER. TAGGED TOC @ 2147' SLM.(aogcc witnessed, cement sample) LRS PERFORMED PASSING CMIT-TxIA TO 2624/2647.(aogcc witnessed, see lrs log) ***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF WELL STATUS*** 5/7/2020 (LRS unit 76 Assist SL with AOGCC CMIT) CMIT-TxIA PASSED to 2624/2647psi ***PASSED*** Witnessed by Brian Bixby, Max Applied Pressure=2750 Target Pressure=2500 psi. Pressured T/IA to 2663/2688psi with 1.4 bbls 60/40. CMIT-TxIA lost 20/20 psi in 1st 15 minutes and 19/19 psi in 2nd 15 minutes for a total of 39/39 psi during 30 minute test. Bled TBGP, bled back ~ 1.4 bbls psi ,Slick line in control of well upon departure. IA/OA = OTG, AFEsign and caution tags hung FWHP=9/23/8 5/8/2020 ***WELL SHUT IN UPON ARRIVAL***(ELINE AD PERF FOR P&A) INTIAL T/I/0=0/0/0 2.5" 10' HSD POWERFLOW 6 SPF 60 DEG 61 TOTAL SHOTS CORRELATED TO TUBING TALLY-XNIP AT 2081' CCL TO TOPSHOT=3.29' CCL STOP DEPTH=1296.71 PRESSURE UP TUBING PRIOR TO PERFORATING PRIOR TO SHOOTING: T/I/0=440/0/0 PERFORATED INTERVAL=1300'-1310' PRESSURE UP TUBING AGAIN AFTER SHOOTING T/I/O=400/150/0 CONFIRM COMMUNICATION ***JOB COMPLETED*** 5/23/2020 T/I/O=0/40/55 Arctic Pack Flush (Plug And Abandonment) Pump down tubing and take returns up OA to tanks. w/ 40 bbls hot (90*) DSL, 20 bbls 9.8 ppg brine SD for one hour to let diesel soak in OA and loosen Artic Pack Flush w/ 50 bbls freshwater+surfactant, 110 bbls hot 9.8 ppg brine to flush Arctic Pack, FWHP=40/55/40. Swab= C, IA & OA= OTG, All block valves=C 5/24/2020 LRS Unit 42- Assist Cement Crew (Plug and Abandonment) Displaced Cement w/ 9 bbls diesel down Tubing. Flushed surface lines w/ 12 bbls Diesel. Swab/Wing/SSV=C, Master=O, IA, OA=OTG Daily Report of Well Operations PBU U-02A 5/24/2020 ***ATTEMPT*** ***LRS on location as standby for contingency displacement, See AWGRS 5/24/20*** SLB in control of well with portable SSV panel SLB pumped 5 bbls 60/40 dow tubing to verify flowpath out the OA to OTT SLB Pumped the following down the tubing taking returns out the OA to OTT: 5 bbls Fresh water, 145.4 bbls, 15.8 ppg Class G Cement Took full losses with 78 bbls 15.8 ppg Class G cement pumped, slowed to rate to try and establish returns pumped additional 67.4 bbls cement LRS displaced cement in tubing with 9 bbls diesel to 600' MD in order to give access to the well for future P&A Verified 88 bbls brine returned to surface from well based on starting strap at tanks. Tubular fluids at suspected time of losses: TBG: 15.8 ppg Class G Cement from surface to 1300' MD IA: 9.8 Nacl from Surface to 1300' MD OA: 9.8 ppg NaCl from surface to 126' MD 60/40 MEOH from 126' MD to 212' MD Fresh Water from 212' MD to 298' MD 15.8 ppg Class G Cement from 298' MD to 1300' MD *** SWAB, SSV shut in, IA & OA CSG Valves OTG upon departure*** Est. TOC in TBG @ ~600' MD Est. TOC in OA @ ? Est. BOC in TBG & OA @ ~1300' MD 5/25/2020 T/I/O = Vac0+/0+. Temp = SI. Tbg, IA, & OA FL (FB request). No AL or flowline. Tbg FL @ near surface. IA FL @ surface. OA FL @ near surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:00 5/31/2020 T/I/O=0/89/30 Temp=SI. OA PT/ verifyT/IA communication (PLUG AND ABANDONMENT) OA was fluid packed on arrival. Pressured OA from 50psi to 500psi with 0.23bbl of 9.8ppg NaCl. OA lost 68 psi in 5 minutes. Pressured TBG to 504 psi with 0.12bbl brine to establish TxIA communication. Unable to establish TxIA communication below 500psi. SV/WV/SSV=Closed MV=Open CV's=OTG FWHP's=0/95/26 ***Job Complete*** 6/7/2020 ***WELL S/I UPON ARRIVAL*** (Plug and Abandonment) DRIFT W/ 2.50" X 10' DUMMY GUN & 2-1/2" SAMPLE BAILER. TAGGED TOC @ 557' SLM. PUNCH TBG 539' - 547' W/ 2" POWERFLOW, 6 SPF, 60 DEG PHASE GUN (verified TxIA communication). ***JOB COMPLETE ON 07-JUN-2020***Punch Daily Report of Well Operations PBU U-02A 6/8/2020 T/I/O=95/33/52 Temp= S/I LRS Unit 76. Verify Injectivity to TxIAxOA (P&A) Pressured up TBG with 0.20 bbls of 50/50 meth/water, IA instantly tracked. Monitored pressures for 5 min, no OA pressure response. Bled T/IA to starting pressures, bled back 0.20 bbls. SV WV SSV= closed, MV IA OA= open. Final Whp's= 50/30/53 ***Job Complete*** 6/12/2020 SLB Pumping Crew. Cement TBG and IA to surface (P&A) Cemented TBG and IA from 547' to surface by circulating 15bbl of 160degF Freshwater with 2gal/mgal F103 and UO66, 10bbl Freshwater spacer, followed by 54bbl of 15.8ppg Artic Set 1 cement down the TBG taking returns from the IA. Clean cement returns after 40bbl away. 100% returns based on returns tank strap. UCA- 2,000psi compressive strength at 49hr 49min. ***Job Complete*** TBG and IA BOC = 547' TBG and IA TOC = surface *OA TOC estimated at 300' (See AWGRS 24-May-2020) 6/16/2020 T/I/O=0/0/0 R/D upper production tree, installed tree cap bonnet on top of Master valve. Torqued to specs. R/D IA valves, installed integrals with 1502 caps. Torqued to specs. FWP's 0/0/0 see log for details. 6/19/2020 T/I/O = 0+/0/0+. Temp = SI. WHPs (post cement). No flow line or AL. Well house and scaffold removed. Single gate valve installed on THA. IA CVs removed, integrals installed on IA =inspection current. Integral installed on OA =inspection current. MV = C. IA, OA = OTG. 01:30 10/18/2020 ***P&A In Progress*** Pulled cellar box and excavated around wellhead to ~5' below well pad. Covered excavation with rig mats and demarcated area. LDFN. 10/19/2020 ***P&A In Progress*** Finish excavation to ~5' below tundra. LDFN. 10/20/2020 ***P&A In Progress*** Set shoring box. Set up ventilation plan. 10/22/2020 Permanent Plug and Abandon *** Excavate around wellhead to 12'. Pad elevation @ 47.7'. Tundra elevation @ 43.5'. Wellhead cut 3' 8"' below tundra elevation. Found contaminated cement in OA. AOGCC Rep Mathew Herrera whitnessed cut depth and cement in all strings. AOGCC Rep asked to remove ~8" from the OA and filled with AS-1 cement. Schedule AOGCC Rep to confim cement top and marker plate, giving cement 24 hours to cure. Pictures taken of cut before and after the cement top added to the OA. Job In Progress. 10/24/2020 ***U-02 P&A Job continued*** State inspector MathewHerrera signed off on cement and marker plate. Marker plate welded and removed shorong box and rig mats. Back filled and deliniated excavation. Pictures taked of marker plate in place. Job Complete MEMORANDUM TO: Jim Regg P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: 10/24/2020 FROM: Matt Herrera SUBJECT: Surface Abandonment Petroleum Inspector PBU U -02A - Hilcorp North Slope PTD 1982390; Sundry 319-201 10/22/2020: 1 traveled to Prudhoe Bay Unit U -Pad for a surface abandonment inspection on well U -02A and met Hilcorp representative Jaycen Sala. Excavation had been completed and the tree removed. The casing cut was determined to be adequate (at least 3 feet below tundra grade) and casing tops exposed. All casing strings and the tubing were filled to surface but upon checking for rigidity of the cement found the outer annuli (13 3/8" x 9 5/8" OA and 20" x 13 3/8" OOA) was soft and mushy. Hilcorp was instructed to dig out as much of the soft material from the 2 annuli and top off with fresh cement. I verified the well information on the marker plate as found in the approved Sundry. I told Operator to give cement at least 12 hours curing time to harden, and I would return to verify. 10/23/2020: Traveled back PBU U -02A to verify the cement integrity in the OA and OOA. The cement had not quite hardened, so Hilcorp was instructed to allow until morning of the next day to harden and I would return to verify. 10/24/2020: 1 stopped by PBU U -Pad and verified cement top and rigidity. Cement to surface on all strings was solid. I allowed them to proceed welding on the marker plate and backfill the excavation. Attachments: Photos (6) % 2020-1024_Surface_Abandon_PBU _U-02A_mh.docx Pagel of 4 Surface Abandonment — PBU U -02A (PTD 1982390) Photos by AOGCC Inspector M. Herrera 10/24/2020 �rt :R 1 t W. Original plate was undersized; welded it to another plate that will cover the 30" x 20" conductor 2020-1024 Surface Abandon PBU U -02A mh.docx Page 2 of 4 2020-1024—Surface—Abandon PBU U -02A mh.docx Page 3 of 4 Digging out the bad cement in 13 3/8" x 9 5/8" OA 2020-1024—Surface—Abandon PBU U-02A mh.docx Page 4 of 4 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg �10- 6_ fil(Z t, P.I. Supervisor FROM: Brian Bixby Petroleum Inspector Section: 18 Township: Drilling Rig: n/a Rig Elevation: Operator Rep: Jeremy Grimes Casing/Tubing Data (depths are MD): Conductor: 20" X 30" " 0. D. Shoe@ Surface: 13 3/8" " 0. D. Shoe@ Intermediate: 9 5/8" 0. D. Shoe@ Production: OA 12 12 12 12 0. D. Shoe@ Liner: 7" - 0. D. Shoe@ Tubing: 41/2" 0. D. Tail@ Plugging Data: Test Data DATE: May 7, 2020 SUBJECT: Well Bore Plug & Abandonment PBU U -02A BP Exploration PTD 1982390; Sundry 319-201 11N Range: 13E n/a Total Depth: 13,429 ft MD Suspend: 110 - Feet 2,672 Feet 9863 Feet Csg Cut@ Feet 9879 Feet 9834 Feet Meridian: Umiat Lease No.: ADL 28283 P&A: X Casing Removal: Csg Cut@ Feet Csg Cut@ Feet Csg Cut@ Feet Csg Cut@ Feet Csg Cut@ Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Balanced 2955 ft MD 2147 ft MD - 9.8 ppg Brine Wireline tag 2614 P OA 12 12 12 12 12 Initial 15 min 30 min 45 min 60 min Result Tubing 2735 2697 2681 - 2668 - 2659 IA 2758 2698 2665 2638 2614 P OA 12 12 12 12 12 Tubing IA OA Initial 15 min 30 min 45 min Result Remarks: _I - Wireline Wireline tag so MD's are wireline measurements. Bottom depth of plug could be 3170 ft MD (top of previous plug attempt) or a casing leak at 2955 ft MD. Good tag of top of cement at 2147 ft MD. Cement is Class "G" 15.8ppg. CMIT TAA Pretest Pressures T/I/O = 0/7/8 psi. Pumped = 2 bbls; bled back = 1.4 bbls. T/I/O pressure losses every 15 min = 38/60/0, 16/33/0, 13/27/0, 9/24/0. Called and discussed pressures with Mel Rixse and he said it was a PASS. Attachments: none rev. 11-28-18 2020-0506_Plug_Verification_PBU_U-02A_bb MEMORANDUM TO: Jim Regg I P.I. Supervisor1SCV )u�z FROM: Lou Laubenstein Petroleum Inspector Section: 18 Township: Drilling Rig: NA Rig Elevation: Operator Rep: Kelly McKenney ' State of Alaska Alaska Oil and Gas Conservation Commission 11N - NA DATE: January 8, 2020 SUBJECT: Well Bore Plug & Abandonment PBU U -02A BP Exploration (Alaska), Inc ' PTD 1982390; Sundry 319-201 ' Range: 13E Meridian: Umiat - Total Depth: 13429 ft MD / Lease No.: ADL0028283 Suspend: P&A: Yes Casing/Tubing Data (depths are MD): Casing Removal Conductor: 20" x 30" . O.D. Shoe@ 100 Feet Csg Cut@ Feet Surface: 13-3/8" O.D. Shoe@ 2672 Feet Csg Cut@ Feet Intermediate: 9-5/8" - 0. D. Shoe@ 9863 Feet Csg Cut@ Feet Production: 0. D. Shoe@ Feet Csg Cut@ Feet Liner: 7 0. D. Shoe@ 9879 Feet Csg Cut@ Feet Tubing: 4-1/2" 0. D. Tail@ 9834 Feet Tbg Cut@ Feet Plugging Data: Type Plug Founded on Depth Btm Depth To MW Above Verified Fullbore Bottom 9822 ft MD9508 ft MD 9.8 ppg C.T. Tag - Tubing Retainer 9490 ft MD 9.8 ppg C.T. Tag " Test Data: Initial 15 min 30 min d5 min RPsulh Tubing 3095 2869 2797 ' IA 158 153 - 151 P OA 18 18 18 ' Remarks: I arrived on location to witness the tag and pressure test of the bottom cement plug on PBU U -02A. These tests where both to be completed by a Coil tubing unit. I witnessed the tag on the top of the cement plug (TOC) @ 9508 feet MD . After confirming the top of the plug 50001b was stacked on top. The operator then pulled up hole and re -tagged showing the TOC to be at the same depth. The next step was for them to run and set a cement retainer to isolate the tubing above and pressure test the plug. The retainer was set at a depth 9490ft, the ball was dropped into the coil and pumped down to the retainer. After the ball was confirmed at the retainer 3700 psi was applied to the coil in order to shear the ball and allow communication below the retainer. I didn't see any definitive sign that the ball had sheared and allowed communication below the retainer. The operator pulled up 50001b and then stacked 50001b on the retainer confirming it to be set. I asked them how they could give me a 100% positive answer that the ball was sheared, and we would be testing the cement plug and not just the coil. The tool hand told me that / pulling up on the coil would allow the ball to drop the rest of the way even if pumping didn't allow it to drop all the way. I witnessed a passing pressure test on Plug 1 TOC (below retainer) as long as the tool was open. ✓ Attachments: none rev. 11-28-18 2020-0108_Plug_Verification_PB U_U-02A_II THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Aras Worthington Interventions and Integrity Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU U -02A Permit to Drill Number: 198-239 Sundry Number: 319-201 Dear Mr. Worthington: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.Gogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this _ day of April, 2019. RBDMS41rk' APR 2 6 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 011LUL9e/LU .APR 18 2019 1. Type of Request. Abandon RI ' Plug Perforations ❑ Fracture Stimulate ❑ Repair -Well ❑ Operdti fdW47b Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 5. Pemlit to Drill Number 198-239 ' 3_ Address: P.O. Box 196612 Anchorage, AK 99519-8612 Stmtigraphic ❑ Service ❑ 6. API Number: 50-029-21170-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No IIZ POU U -02A ' 9. Property Designation (Lease Number): 10, Field/Pools: ADL 028283 8 047451 PRUDHOE BAY. PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD dQ: Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13429 - 8971 2081 2081 2081 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" x 30" 30-110 30-110 Surface 2642 13-3/8" 30-2672 30-2672 5380 2670 Intermediate 9835 9-5/8" 28-9863 28-8789 6870 4760 Liner 272 7" 9607-9879 8564-8803 7240 5410 Scab Liner 6641 7" 2965-9606 2965-8563 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 1 9904- 13429 Be25 - 8971 4-1/2" 12.6# L-80 26-9834 Packers and SSSV Type: 4-12" Baker S-3 Penn Packer Packers and SSSV MD (ft) and TVD (ft): 9531/8498 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13, Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 - Service ❑ 14. Estimated Date for Commencing Operations: May 1, 2019 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned 0 ' 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Alvan, Mike (Udelhoven) be deviated from without prior written approval. Contact Email. mike.aivanoatip.com Authorized Name: Worthington, Ares J Contact Phone: +1 9075645475 Authorized Title: Interventions & Integrity Engineer Authorized Signature: Date: �// �j2fw * /, r I �l dZ/ COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: n I ^ -2-o O •VC NI Plug Integrity UK' BOP Test ❑ Mechanical Integrity Test W- Location Clearance Other��` QlfrjC./-ova-wSr �O 'L��.w� a C.�p.y�-OrrwG,.� Post Initial lnjecct-ion MIT Req'd? Yes No ❑ RBDMSII APR 2 6 2019 Spacing Exception Required? Yes ❑ No lir/Subsequent Form Required: I0 � y Th APPROVED BYTHE gr_7��_ Approved by: COMMISSIONER COMMISSION Date— ZS IM ye, Form 10-403 Revised 04/2017 ORIGINAL Approved application is wild for 12 months from the date of approval. jVv64Z23At R1:_(' /may Submit Form and Attachments in Duplicate U-02 P&A Intervention Engineer Mike Aivano (907) 564-5475 Aras Worthington (907) 564-4102 Production Engineer Ryan Thompson (907) 564-4535 Expected Start Date: May 1, 2019 History: U-02 was drilled and completed as a conventional Z4 producer in 1985. U-02 had significant corrosion problems. The original 3-1/2" tubing was replaced 7/90 and a 7" scab liner installed to repair a casing leak. The well was shut-in 5/19/98 due to repeated casing integrity problems and poor production, then side tracked in 1999. U -02A reached a depth of 13429' md, —1700' below plan. The well did not reach the primary target due to high fluid loss intervals, fault related fractures, and the risk of a poor cement job, thus finalized as a barefoot completion. U - 02A was shut-in 8/26/02 (due to T x IA communication). It passed an NFT on 10/24/02 but POP attempts were unsuccessful due to low flow from the reservoir and a hole in the tubing. Attempts were made change out the GLV from Station #4, it was found damaged and a piece broken off — possible piece of the GLM sticking out into the wellbore. Fishing runs found fill / obstructions at —6989' wlm, with several bailing runs recovering the missing GLV fishing neck, mud like material, solid clay and cement while working down to 7023' wlm. On 12/8/03, a production casing leak and tubing leak was identified by E -Line LDL at 2960' and in the tubing and 3170' and in the production casing. Objective: Perform a full P&A on the well placing cement plugs in the wellbore. Excavate and cut casings 3' below original tundra level and install marker plate. DPZ 1: From 2004' and - 6080' and DPZ 3: Top at 9877' and - did not find the bottom of the DPZ during drilling Procedural Steps: Slickline / Fullbore 1. Pull XX Plug from 2081' MD. 2. D&T with Drive Down Bailer as deep as possible, sample fill. • Last tag was at 7023' wlm on 5/6/2003 U-02 P&A Sundry v3 Coil Tubing 1. RIH with nozzle and clean out 4-1/2" tubing down to the tubing tail (-9834' md). Risk of breaking through fill and well going on vac - potential stuck pipe. 2. Punch tubing at -9550' md. ( Just below 7"x4-1/2" Prod Packer) 3. Pickup cement nozzle and lay -in cement from the tubing tail at 9834' and to approximately 9520' md. • Lay -in -10 bbls of cement as per design ✓ Cement Type/weight: Class G 15.8 ppg mixed on the fly. Field blend to be =lab ppg +/- 0.1 ppg Slurry Temperature: between 80° and 110°F Fluid Loss: 40-200cc (20-100cc/30 min) Compressive Strength: 2000 psi in 48 hrs. Thickening Time: Minimum 4 hours 4. Circulate cement and wellbore clean down to -9520' md. 5. Wait on cement to reach a compressive strength of 500 psi. 6. Pick up DJN Nozzle and RIH to tag TOC - AOGCC Witnessed. 7. MU Cement Retainer and set at -9500' md, just above TOC. Pressure test below retainer to 2500 psi. - AOGCC Witnessed. ✓ 8. RIH with tubing punch for 4-1/2" tubing, tag cement retainer, pick up -10 ft and punch at -9490' md. 9. Circulate Surfactant Pill and Brine down CT and up Tbg x CT annulus. 25 bbls hot fresh water + surfactant (2gal/mgal F103 and 2 gal/mgal UO67) • -120 bbls of 9.8 ppg brine 10. Circulate Surfactant Pill and Brine down CT and up IA. • 50 bbls hot fresh water + surfactant (2gal/mgal F103 and 2 gal/mgal UO67) • -290 bbls of 9.8 ppg brine 11. Lay -in cement from 9500' and to 2200' md. ✓ • Lay -in -274 bbls of cement as per design Cement Type/weight: Class G 15.8 ppg mixed on the fly. Field blend to be =lab ppg +/- 0.1 ppg Slurry Temperature: between 80° and 110°F Fluid Loss: 40-200cc (20-100cc/30 min) Compressive Strength: 2000 psi in 48 hrs. Thickening Time: Minimum 8 hours U-02 P&A Sundry 0 Slickline / Fullbore 1. D&T TOC inside 4-1/2" tubing. 2. MIT -T to 2500 psi. 3. Perforate tubing @ —1300' and (use Eline if Slickline unable) Fullbore 1. RU to pump down the tubing and take returns from the OA. Pump the following: • 50 bbls hot (160F) diesel • 42 bbls hot (160F) 9.8 ppg brine • SD for one hour to let diesel soak in OA and loosen Arctic Pack • 50 bbls hot (160 deg) freshwater + surfactant; 2 gal/mgal F103 and 2 gal/mgal UO67 • 100 bbls hot (160F) 9.8 ppg brine 2. Once clean brine is consistently returned from the OA indicating that all hydrocarbons have been circulated out of the annuli, pump OA surface cement plug as follows down tubing. • 5 bbls MEOH • 5 bbls freshwater spacer • 91 bbls of cement per design (15 bbls excess) • Top of cement will be at surface in the OA 3. Swap valving over to pump down the tubing and up the IA. Pump the following IA and tubing surface cement plug as follows. • 104 bbls of cement as per design (15 bbls excess) • Top of cement will beat surface in the IA and tubing Cement Type/weight: Class G 15.8 ppg mixed on the fly. Field blend to be =lab ppg +/- 0.1 ppg Slurry Temperature: between 80° and 110°F Fluid Loss: 40-200cc (20-100cc/30 min) Compressive Strength: 2000 psi in 48 hrs. Thickening Time: Minimum 4 hours D'p Assist Fullbore with cement job and pump N2 across the wellhead valves to remove cement, this will help when opening valves in later steps to check pressures. U-02 P&A Sundry v3 2. Bleed all wellhead pressures to 0 psi. 3. Monitor wellhead pressures 24 hours after the pressures were bled to 0 psi. Special Projects 1. Excavate and Cutoff all casings and wellhead 3' below original tundra level. Top job the conductor x 13-3/8" annulus and all other annuli and tub' g with cement as needed. 2. AOGCC witness cement tops in all annuli. ?" m f urwQ�i rt7) �ti•vt��+ 3. Bead weld marker capon outermost casing string (Conductor Pipe) to read as follows: N.t.o.t1ce r BP Exploration Alaska, Inc. ptw�s U -02a PTD # 198-239 API # 50-029-21170-01 Cement Plug Calculations 4-1/2" Tbg 7" 29# x 4-1/2" Tbg 7" 26# x 4-1/2" Tbg 9-5/8" x 4-1/2" Tbg 13-3/8" x 9-5/8" Csg Lower Cement Plug Btm 0.0152 bpf 0.0175 bpf 0.0186 bpf 0.0535 bpf 0.0581 bpf Top Footage Bbls 4-1/2"Tbg 1 98341 9520 3141 9-5/8" x 4-1/2" Tbg 1300 0 13001 1 4.7728 7" 29# x 4-1/2" Tbg 98341 95311 3031 W/ 15 bbls Extra 1 5.3025 9-5/8"x 4-1/2" Tbg Total Volume 1 10.1 Second Plug Btm Top Footage Bbls 4-1/2" Tbg 9490 2200 72901 9-5/8" x 4-1/2" Tbg 1300 0 13001 110.808 7" 26# x 4-1/2" Tbg 9490 2965 6525 W/ 15 bbls Extra 121.365 9-5/8"x 4-1/2" Tbg 2965 2200 765 40.9275 Total Volume 273.1 Third Plug Btm Top Footage Bbls 13-3/8"x 9-5/8" Csg 1300 0 13001 1 75.53 9-5/8" x 4-1/2" Tbg 1300 0 13001 Total Volume 75.5 Total Volume W/ 15 bbls Extra 90.5 Btm Top Footage Bbls 4-1/2" Tbg 1 1300 0 13001 19.76 9-5/8" x 4-1/2" Tbg 1300 0 13001 69.55 Total Volume 89.3 W/ 15 bbls Extra 104.3 U-02 P&A Sundry v3 4 O 00 O V O O N II N CL O Tbg Wellbore Schematic U�� w SAFMNDTEk OLE1N9-5WC8G7/W.3IW- Est TOC @1806ft „ 70.01007ANDp'0 10311'.--MXYI COMM-- aboveth Arctic Pack above ---- b - 2960', Csg Leak @ 3170( & possible @ 2955'/" Mininum ID = 3.726" @ 9822' 411r HES XN NIPPLE Est TOC@4824ft- 7" Scab Liner - pumped 10 bbls over for cement volume -job did not go well. EST TOC @ 5700 ft TUMk2WL20•.0383W.V-8277 S80S' TOPOF r RAR f80C Fully cemented 7" Liner 41lr TM 1215. L -K A152 W, D_3.9w HM3!' R3SORATXINSIAAMRY REF LOG' ANGLEATTOPPIRF 30.09904' Now: Rd. b Radiation OB for W W cal pert dN SIZE I SIF I ME2VAL I Orr -4z I SNOT I SOZ OPENHOLE 9904-13249 O OM6" 10 GAS LFT MANDRELS ST MO I TVD CF TYPE VLV ILATCHIIPMI ODON98 Sill 10113n8 JMCVJO SEf XX RUG 110nNi6) 617E 6 3167 3067 10 UM 0.M M 0 s ux 417s 36 CAY OO6E M 16 / 6x7 fi071 04 CAM OOI.E M 16 3 6170 7271 71 CAY SO M 24 1009@ 2 8804 7837 71 6111 0.F' M 0 19152 8;452 29 GIM 11M7 M 0 Est Top of Fill based on SL 2003 @ 7023'slm 6W TT WT LOGGED MLLOIRNfOW/ 9879 -9901' Cement added during Drilling U-02 P&A Sundry v3 5 PgOOEBAY LM NHL NO2A EB81f M:'1962390 ARM 50-029,21170-01 SEC 16. T11N R13E 237 FSL, 2431 FE WE REV BY IXXI.B4f5 617E REV BY OOII.BIIS 198A gBC�NL COYIiION 02112A3 JMI(AK VMN6i SAFEIY NNE fEI. ODON98 Sill 10113n8 JMCVJO SEf XX RUG 110nNi6) Ni08O/ ASW FTlAL 01D402 10M OONE:IOIS 10N1O2 KM INO"111on (AW My U-02 P&A Sundry v3 5 1YLN6iSAFE11'IDiE 1406102 .MNAK 0.V GD U-02 P&A Sundry v3 5 Cmt in OA, fA, & Tbg from 1300' and to Surface 0 O ON 13-3/8"ug@2680 N Csg Leaks @ 3170 and possible 295'. 0- Tbg Leak @ 2960 7" 2611TOLTieback @ 2965' Est TOC for 9-5/8" Csg @ 4824' — 7"Tieback Est. TOC @ 5700' 4-1/2" Prd Pkr @ 9531' 7" 29# Lnr TOL @ 9606' TOC from Side Track P&A @ -9739 4-1/2" W LEG @ 9834' 9-5/8" Csg @ 9868' v N 41 0 O F- M M n 00 I I M N 7" 29k Lnr Cc O U -02a Proposed P&A ;•-; Cement added during Drilling Phase Cement added for P&A Perf Tbg and IA @ 1300' Nip @ 2081' TOC in 4-1/2" Tbg "2200 xh 4-1/2" Tbg `9490 7' Cmt Retainer set @ -9500 : in 4-1/2" Tbg-9520 lip @ 9520' I Punch @ ^'9545' ip @ 9554' V Nip @ 9822' gill Out Window @ 9879-9904' 6" Open Hole to 13429' U-02 P&A Sundry v3 6 BP EXPLORATION (ALASKA) INC., PRUDHOE BAY UNIT U -02A (198-239) PRUDHOE BAY, PRUDHOE OIL Monthly Production Rates 10,000,000 1,000,000 Y C c0 C G 100,000 LL v o N C 10,000 9 _ � O o o m a t7 LL C 1,000 u m 100 3 O L 10 1 4— Jan-1995 Jan -2000 Jan -2005 Jan -2010 Jan -2015 I Produced Gas (MCFM) . GOR Produced Water (BOPM) —e— Produced Oil (BOPM) 10,000,000 W d 1,000,000 m N M O 100,000 1 0 O s 10,000 0 w w 1,000 O cr G d K fD 100 a (D 3 0 3 .+ 30 s I 1 Jan -2020 SPREADSH EET_1982390_PBU_U-02A_Prod-inject_Curves_W ell_Oil_V 120_20190422.x1sx 4/22/2019 • • f.;J V"Q#1t , ja BP Exploration (Alaska) Inc. 2 7 11 Attn: Well Integrity Coordinator, PRB -20 ` ail Post Office Box 196612 �SIOA Anchorage, Alaska 99519 -6612 tt��,r' +� ( � a 2 0 .' �tiri5,�= ` ��" � ncn December 20, 2010 2 4 201 AdltiNED JAN Mr. Tom Maunder • , Alaska Oil and Gas Conservation Commission 333 West 7 Avenue J ...• O Anchorage, Alaska 99501 Subject: Corrosion. Inhibitor Treatments of GPB U Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from U Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) U -pad Date: 12/20/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal U - 1920110 50029222440000 NA 0.8 NA 3.4 1/12/2010 U -02A 1982390 50029211700100 NA 0.6 NA 1.7 1/12/2010 U-03 1841470 50029211730000 NA 0.4 NA 1.7 1/12/2010 U -05A 2090700 50029211920100 NA 0.6 NA 3.4 1/12/2010 1/13/2010 U -066 2050640 50029211170200 NA 1.9 NA 15.3 U -07 1840900 50029211270000 NA 0.6 NA 5.1 1/13/2010 U -08A 1982020 50029211360100 NA 1.4 NA 8.5 1/13/2010 U -09A 1982120 50029211440100 NA 0.2 NA 1.7 1/13/2010 U -10 1851970 50029214230000 NA 7.7 NA 57.8 12/28/2009 U -11B 1931080 50029214200200 NA 0.8 NA 5.1 1/13/2010 U -12A 2041470 50029214090100 NA 0.6 NA 3.4 1/12/2010 U -13 1781010 50029203550000_ NA 0.1 NA 3.4 1/12/2010 U -14 1931000 50029223860000 NA 0.1 NA 1.7 1/13/2010 U -15B 2011970 50029225650200 NA 1.4 NA 13.6 1/13/2010 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well 1-01/J-19 \ X~ -(1 ~ ..,1- U-02A q 55 ~ ;::)"2C; 0.5. 09-20 "~~-O4 W-17 ~S{"'(f')q ~ G-15A C'~ ~I ~~ 01-33 <; ~;:""" 0.5. 2-24 <; "'(" )....~ \ 0-07 A :¡. -('T'-~ MPS-26 ~Ið ~ '- ðtšf l MPK-21A n'Q3'" \ l Ot'~ MPS-16 ,gl(j-:2, -CJloL~ Job # 10662975 10708038 10674403 10621748 10564495 10568434 10560320 10572013 10563066 10621740 10563067 Log Description Date LDL LDL PSP LDL TEMPERATURE PROFILE RST-SIGMA RST-SIGMA SCMT SCMT SCMT USIT SCMT 12/04/03 12/09/07 11/26/03 11/28/03 07/11/03 04/15/03 11/10/03 04/21/03 05/30/03 11/01/03 05/31/03 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc, Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~e\ ,,-,~ '- ~ ~ i:'- ' \J ~ II'\. -\......),- . (.~ ~ I'o...,^, SCÞ\¡~NED DEC 3 Û 2003 Blueline NO. 3068 Company: 12/11/03 State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints 1 1 1 1 1 1 CD ( 1 1 / !Q IŸ. 'I' c.:¡ ).:::J -:¿ r I ./ 2 2 2 2 2 , . Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 r'~ °J<.". -"""";" :l- ~ \ :( :E 0 ATTN: Beth M':}-"l,.t--- ~ V. ;', . L. . \\ ,-.. V 1-... ~ ' """'" . Received by:---D,F r 1? ?{)n~ ,--.... -- -.".....,.- Ala3k~ OJ¡ (.. Gz\s Üms. COmmjs~n Ar¡çhc?jt!ge MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supervisor DATE: April 17, 2001 FROM: Lou Gdmaldi, SUBJECT- Petroleum Inspector SVS Tests BPX U-pad Prudhoe Bay Field Tuesday, A~3ril 17, 200!; I witnessed the Semi-Annual SVS tests on BPX U pad in the Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (No Failures) are noted on the accompanied SVS test spreadsheet. Ali well houses were in "OK" condition. The pad was clean and in good condition. SUMMARY: I witnessed the SVS test on U pad in the Prudhoe Bay Field. 2 wells, 6 components, No failures. Attachments: SVS PBU U pad 4-1-01 LG.XLS NON-CONFIDENTIAL SVS PBU U pad 4-17-01 LG AlasEa-Oil and Gas Conservation Commissar.~ Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Lou Grimaldi Submitted By: Lou Grimaldi Date: Field/Unit/Pad: ,Pruhoe BaY Held,. ,U pad Separator psi: LPS 159 HPS l'7-Apr Well Pemit Separ Set L~ Test T~t Test Date oil WAG, G~J, Number Number PSI PSI , Trip Code ,Code Cgde Passed G~or~CLE U-02A 1982~90 15b .... 125 115 P P OIL .. U-06A 1990760 , , ,, U207 1840900 U_08A "19820~'0 ...... ..... . U-09A 1982120 159 125 100 P P ' OIL U-I~B 1931080 159 125 90 P P ' 0IL , .. , . .. U-12 1851820 ~ ,i , ,, U-13 1781010 159 125 110 P P O~ . [ , , . , ,,. . , , · . . ., , ., , , , , , U-14 1931000 159 125 100 P P OIL .. ,, , .. U-15A 1950970 .,, ,., . . . ., Wells: 5 Components: t0 Failures: 0 Failure Rate: 0.00% [2 90 var Remarks: RJF 1/16/01 Page 1 ofl SVS PBUU pad 4-17-01 LG 198-239-0 PRUDHOE BAY UNIT U-02A 50- 029-21170-01 Roll #1: Start: Stop Roll #2: Start Stop MD 13429 TVD 08971 Completion Date: ~/2~6/99 Completed Status: 1-OIL BP EXPLORATION (ALASKA) INC Current: T Name Interval Sent Received D 9295 ff_.A~~'' SPERRY GR/EWR4 PB1 OH 8/31/99 8/31/99 D 9296 ~"f-i3 SPERRY GR/EWR4 OH 8/31/99 8/31/99 L DGR/EWR4-MD ~F~AL 9715-13429 OH 9/9/99 9/14/99 L DGR/EWR4-MD ~.~F~lq'AL 9715-15568 PB1 OH 9/9/99 9/14/99 L DGR/EWR4-TVD D4eINAL 8659-8971 OH 9/9/99 9/14/99 L DGR/EWR4-TVD t~.'~HAL 8659-9~0.025 PB1 OH 9/9/99 9/14/99 R SRVY RPT (~'"~Y 10217.15-13429. OH 3/15/99 3/15/99 R SRVYRPT ~RRY 9791.54-15628. PB1 OH 3/15/99 3/15/99 T/C/D D Thursday, February 01,2001 Page I of I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ':"'"' WELL COMPLETION OR RECOMPLETION REPORT AND LO '61~, ~:~/, ,~,; ~i'?,, ~::~j~.~., ....... 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [~] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-239 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21170-01 4. Location of well at surface :}- ~.::.~ .:-~ ¢~.~:;-::-.~ ............... ~'-~.~. 9. Unit or Lease Name 237' NSL, 2434' WEb, SEC. 18, T11N, R13E, UM ~'~.'~'-; ...... ! ~.~./~, ~~£,,~,__~,~.~ '~. Prudhoe Bay Unit At top of productive interval ~ 10. Well Number 2744' NSL, 235' WEb, SEC. 13, T11N, R12E, UM _.~~4'. '_~-.~ U-02A At total depth .i{ ~,;.~u:~; :. ~~'~ ' 11. Field and Pool 4918'NSL, 2556'WEL, SEC. 13, T11N, R12E, U~ ..... "~--' ; ~:': ' Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 76.54I ADb 047451 12. Date Spudded12/28/98 113' Date T'D' Reached J 14' Date C°mp" Susp" °r Aband'115' Water depth' if OffshOre 116' N°' °f C°mpleti°ns2/1/99 2/6/99 N/A MSLI One 17. Total Depth (MD+TVD) 118. mug Back Depth (MD+T VD) II9. Directional Survey 120. Depth where SSS V set 121. Thickness of Permafrost 13429 8971 FTt 13429 8971 FTI [~Yes []NoI (Nipple) 2081' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIP, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, aP, MRES, Sonic 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20"x 30" Insulated Conductor Surface 110' 36" Bcu )/ds concrete 13-3/8" 72# L-80 Surface 2680' 17-1/2" 3720 cu ft Permafrost 'E' & II 9-5/8" 47# L-80 Surface 9871' 12-1/4" 2095 cuft Class 'G', 285 cuft Permafrost .... 7" 26# L-80 2965' 9604' 8-1/2" 1028 cu ft Class 'G' (Scab Liner) 7" 26# L-80 9607' 9879' 8-1/2" _~70 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 6" Open Hole Completion 4-1/2", 12.6#, L-80 9834' 9531' MD TVD MD TVD 9879' - 13429' 8804' - 8971' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 152 Bbls of Diesel 27. PRODUCTION TEST [ I i" I1 1 g I Date First Production I Method of Operation (Flowing, gas lift, etc.) ~- v ~ ~ ¥., ~ L... February 18, 1999 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure iCALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR) Press. !24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9869' 8795' Shublik 9904' 8825' Shublik 'B' 9963' 8873' Shublik 'C' 9988' 8891' Top of Sadlerochit 10026' 8915' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the fo/egoing is true and correct to the best of my knowledge Signed TerrieNubble~"'" ,! ~_~, ~ Title Technical Assistant III Date 0~']S' ¢(~ U-02A 98-239 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 18 Dec 98 19 Dec 98 20 Dec 98 21 Dec 98 22 Dec 98 23 Dec 98 PB U Pad 17:00-17:30 17:30-21:00 21:00-01:00 01:00-04:00 04:00-06:00 06:00-08:00 08:00-09:00 09:00-10:30 10:30-12:00 12:00-13:30 13:30-17:00 17:00-20:30 20:30-21:00 21:00-22:30 22:30-23:30 23:30-01:30 01:30-02:00 02:00-03:30 03:30-06:00 06:00-07:00 07:00-08:30 08:30-10:00 10:00-11:30 11:30-15:30 15:30-21:00 21:00-06:00 06:00-06:30 06:30-07:30 07:30-10:00 10:00-11:30 11:30-23:00 23:00-23:30 23:30-00:30 00:30-05:00 05:00-05:30 05:30-06:00 06:00-07:30 07:30-14:00 14:00-21:00 21:00-02:00 02:00-03:00 03:00-04:30 04:30-05:30 05:30-06:00 06:00-09:30 09:30-12:00 12:00-12:15 12:15-17:00 17:00-18:30 18:30-19:30 19:30-20:00 20:00-21:00 21:00-23:00 23:00-04:00 Duration 1/2 hr 3-1/2 hr 4hr 3hr 2hr 2hr lhr 1-1/2 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 3-1/2 hr 1/2 hr 1-1/2 hr lhr 2hr 1/2 hr 1-1/2 hr 2-1/2 hr lhr 1-1/2 hr 1-1/2 hr 1-1/2 hr 4hr 5-1/2 hr 9hr 1/2 hr lhr 2-1/2 hr 1-1/2 hr 11-1/2 hr 1/2 hr lhr 4-1/2 hr 1/2hr 1/2hr 1-1/2 hr 6-1/2 hr 7hr 5hr lhr 1-1/2 hr lhr 1/2 hr 3-1/2 hr 2-1/2 hr 1/4 hr 4-3/4 hr 1-1/2 hr lhr 1/2 hr lhr 2hr 5hr Progress Report Well U-02A Rig Nabors 9ES Page Date Activity Held safety meeting Rig moved 100.00 % Rigged up Rig services Rigged up Fluid system Circulated at 0.0 ft Circulated at 0.0 ft Installed Hanger plug Rigged down Xmas tree Rigged up BOP stack Held safety meeting Rigged up BOP stack Tested BOP stack Serviced Top drive Retrieved Hanger plug Removed Tubing hanger Circulated at 9553.0 ft Laid down 130.0 ft of Tubing Functioned Retrievable packer Retrieved Seal assembly Retrieved Seal assembly Installed Seal assembly Tested BOP stack Retrieved Retrievable packer Laid down 2100.0 ft of Tubing Laid down 5540.0 fl of Tubing Laid down 9553.0 fl of Tubing Serviced Drillfloor / Derrick Rigged up Drillstring handling equipment Made up BHA no. 1 Serviced Block line R.I.H. to 9344.0 ft Fished at 9344.0 ft Circulated at 9344.0 ft Pulled out of hole to 312.0 ft Pulled BHA Laid down fish Made up BHA no. 2 R.I.H. to 9553.0 fl Washed over string at 9562.0 ft Pulled out of hole to 374.0 ft Pulled BHA Made up BHA no. 3 Serviced Block line Serviced Drillfloor / Derrick R.I.H. to 9554.0 ft Washed over string at 9715.0 ft Held safety meeting Pulled out of hole to 374.0 ft Pulled BHA Laid down fish Held drill (Abandonment) Serviced Top drive Rig waited: Materials Repaired Bottom ram 1 10 February 99 Facility PB U Pad Progress Report Well U-02A Rig Nabors 9ES Page Date 2 10 February 99 Date/Time 24 Dec 98 25 Dec 98 26 Dec 98 27 Dec 98 28 Dec 98 04:00-05:00 05:00-06:00 06:00-06:15 06:15-06:30 06:30-07:00 07:00-11:00 11:00-13:30 13:30-13:45 13:45-18:45 18:45-19:30 19:30-20:30 20:30-21:15 21:15-01:45 01:45-02:00 02:00-06:00 06:00-07:30 07:30-08:30 08:30-09:00 09:00-09:30 09:30-11:00 11:00-11:30 11:30-12:00 12:00-15:30 15:30-16:30 16:30-20:00 20:00-22:30 22:30-23:30 23:30-06:00 06:00-11:30 11:30-13:30 13:30-14:30 14:30-15:00 15:00-15:15 15:15-20:00 20:00-21:30 21:30-22:00 22:00-01:30 01:30-02:00 02:00-02:30 02:30-05:30 05:30-06:00 06:00-12:30 12:30-13:30 13:30-13:45 13:45-14:15 14:15-16:30 16:30-20:30 20:30-21:45 21:45-22:00 22:00-01:30 01:30-03:30 03:30-04:00 04:00-04:30 04:30-06:00 Duration 1 hr 1 hr 1/4 hr 1/4 hr 1/2 hr 4 hr 2-1/2 hr 1/4 hr 5 hr 3/4 hr 1 hr 3/4 hr 4-1/2 hr 1/4 hr 4 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 1 hr 3-1/2 hr 2-1/2 hr 1 hr 6-1/2 hr 5-1/2 hr 2 hr 1 hr 1/2 hr 1/4 hr 4-3/4 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 3 hr 1/2 hr 6-1/2 hr 1 hr 1/4 hr 1/2 hr 2-1/4 hr 4 hr 1-1/4 hr 1/4 hr 3-1/2 hr 2 hr 1/2 hr 1/2 hr 1-1/2 hr Activity Tested Bottom ram Made up BHA no. 4 Made up BHA no. 4 (cont...) Held safety meeting Made up BHA no. 4 R.I.H. to 9647.0 ft Washed over string at 9693.0 ft Flow check Pulled out of hole to 368.0 ft Pulled BHA Laid down fish Made up BHA no. 5 R.I.H. to 9647.0 ft Fished at 9647.0 ft Pulled out of hole to 3500.0 ft Pulled out of hole to 310.0 ft (cont...) Pulled BHA Laid down fish Held safety meeting Laid down fish Rigged down Tubing handling equipment Rigged up Drillstring handling equipment Made up BHA no. 6 Serviced Block line Singled in drill pipe to 4425.0 ft R.I.H. to 9715.0 ft Tested Casing Drilled cement to 9752.0 ft Drilled cement to 9900.0 ft (cont...) Circulated at 9900.0 ft Performed cement integrity test Held drill (Kick (well kill)) Flow check Pulled out of hole to 881.0 ft Pulled BHA Retrieved Wear bushing Tested BOP stack Installed Wear bushing Serviced Top drive Made up BHA no. 7 R.I.H. to 1500.0 ft R.I.H. to 9900.0 ft (cont...) Set tool face Held safety meeting Circulated at 9879.0 ft Drilled to 9892.0 ft Drilled to 9904.0 ft Circulated at 9904.0 ft Flow check Pulled out of hole to 881.0 ft Pulled BHA Serviced BOP stack Serviced Top drive Made up BHA no. 8 Progress Report Facility PB U Pad Well U-02A Page 3 Rig Nabors 9ES Date 10 February 99 Date/Time 29 Dec 98 30 Dec 98 31 Dec 98 01 Jan 99 02 Jan 99 06:00-07:00 07:00-10:30 10:30-10:45 10:45-11:30 11:30-12:00 12:00-12:30 12:30-13:00 13:00-15:00 15:00-16:00 16:00-21:30 21:30-23:00 23:00-23:15 23:15-03:45 03:45-04:15 04:15-04:30 04:30-05:00 05:00-06:00 06:00-08:30 08:30-14:00 14:00-15:00 15:00-06:00 06:00-20:00 20:00-22:00 22:00-23:00 23:00-23:15 23:15-23:30 23:30-00:00 00:00-00:15 00:15-03:30 03:30-05:00 05:00-06:00 06:00-07:00 07:00-11:00 11:00-11:15 11:15-12:00 12:00-12:15 12:15-13:00 13:00-13:30 13:30-13:45 13:45-14:00 14:00-14:15 14:15-14:30 14:30-01:00 01:00-02:00 02:00-06:00 06:00-18:30 18:30-22:30 22:30-22:45 22:45-00:00 00:00-00:15 00:15-04:30 04:30-06:00 06:00-06:30 Duration 1 hr 3-1/2 hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1 hr 5-1/2 hr 1-1/2 hr 1/4 hr 4-1/2 hr 1/2 hr 1/4 hr 1/2 hr 1 hr 2-1/2 hr 5-1/2 hr 1 hr 15hr 14hr 2hr 1 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 3-1/4 hr 1-1/2 hr 1 hr 1 hr 4 hr 1/4 hr 3/4 hr 1/4 hr 3/4 hr 1/2 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 10-1/2 hr 1 hr 4 hr 12-1/2 hr 4 hr 1/4 hr 1-1/4 hr 1/4 hr 4-1/4 hr 1-1/2 hr 1/2 hr Activity Made up BHA no. 8 (cont...) R.I.H. to 9530.0 ft Held safety meeting Serviced Block line R.I.H. to 9850.0 ft Set tool face Reamed to 9904.0 ft Drilled to 9930.0 ft Logged hole with LWD: DIR/FE from 9830.0 ft to 9930.0 ft Drilled to 10152.0 ft Circulated at 10152.0 ft Flow check Pulled out of hole to 199.0 ft Pulled BHA Downloaded MWD tool Serviced Drillfloor / Derrick Made up BHA no. 9 Made up BHA no. 9 R.I.H. to 10150.0 ft Logged hole with LWD: Formation evaluation (FE) from 10150.0 ft to 10116.0 fi Drilled to 10880.0 ft Drilled to 11491.0 ft Circulated at 11491.0 ft Pulled out of hole to 9850.0 ft Flow check Circulated at 9850.0 ft Pulled out of hole to 9500.0 ft Held safety meeting Pulled out of hole to 200.0 ft Pulled BHA Made up BHA no. 10 Made up BHA no. 10 R.I.H. to 9642.0 ft Held safety meeting Serviced Block line Held safety meeting Serviced Top drive R.I.H. to 9860.0 ft R.I.H. to 11463.0 ft Took MWD survey at 11463.0 fi R.I.H. to 11491.0 ft Circulated at 11491.0 fi Drilled to 11856.0 ft Repaired Flowline Drilled to 11968.0 ft Drilled to 12541.0 ft (cont...) Circulated at 12541.0 fi Flow check Pulled out of hole to 9850.0 fi Flow check Pulled out of hole to 218.0 ft Pulled BHA Pulled BHA (cont...) Progress Report Facility PB U Pad Well U-02A Rig Nabors 9ES Page 4 Date 10 February 99 Date/Time 06:30-09:00 09:00-10:30 10:30-17:30 17:30-17:45 17:45-18:15 18:15-18:30 18:30-06:00 03 Jan 99 06:00-06:00 04 Jan 99 06:00-10:30 10:30-13:30 13:30-16:00 16:00-16:30 16:30-17:30 17:30-00:00 05 Jan 99 00:00-00:30 00:30-03:30 03:30-06:00 06:00-06:30 06:30-07:30 07:30-08:00 08:00-15:00 15:00-16:30 16:30-06:00 06 Jan 99 06:00-10:30 10:30-11:00 11:00-11:30 11:30-18:00 18:00-19:00 19:00-06:00 07 Jan 99 06:00-14:15 14:15-18:30 18:30-22:00 22:00-23:00 23:00-03:30 08 Jan 99 03:30-06:00 06:00-07:30 07:30-12:30 12:30-13:30 13:30-14:00 14:00-15:00 15:00-19:00 19:00-02:00 09 Jan 99 02:00-04:00 04:00-06:00 06:00-07:00 07:00-11:00 11:00-11:30 11:30-13:00 13:00-16:00 16:00-17:15 17:15-00:15 10 Jan 99 00:15-03:00 03:00-06:00 06:00-10:30 Duration 2-1/2 hr 1-1/2 hr 7 hr 1/4 hr 1/2 hr 1/4 hr 11-1/2 hr 24 hr 4-1/2 hr 3 hr 2-1/2 hr 1/2 hr 1 hr 6-1/2 hr 1/2 hr 3 hr 2-1/2 hr 1/2 hr 1 hr 1/2 hr 7 hr 1-1/2 hr 13-1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 6-1/2 hr 1 hr llhr 8-1/4 hr 4-1/4 hr 3-1/2 hr 1 hr 4-1/2 hr 2-1/2 hr 1-1/2 hr 5 hr 1 hr 1/2 hr 1 hr 4 hr 7 hr 2 hr 2 hr 1 hr 4 hr 1/2 hr 1-1/2 hr 3 hr 1-1/4 hr 7hr 2-3/4 hr 3 hr 4-1/2 hr Activity Made up BHA no. 11 Singled in drill pipe to 1650.0 ft R.I.H. to 10638.0 ft Took MWD survey at 10638.0 ft R.I.H. to 12455.0 ft Washed to 12541.0 ft Drilled to 13000.0 ft Drilled to 13800.0 ft (cont...) Drilled to 13991.0 ft Circulated at 13991.0 ft Pulled out of hole to 9842.0 ft Circulated at 9842.0 ft Held safety meeting Pulled out of hole to 150.0 ft Downloaded MWD tool Tested BOP stack Made up BHA no. 12 Made up BHA no. 12 Held safety meeting Made up BHA no. 12 R.I.H. to 9872.0 ft Serviced Block line Drilled to 14211.0 ft Drilled to 14462.0 ft Pulled out of hole to 14080.0 ft R.I.H. to 14462.0 ft Drilled to 14685.0 ft Circulated at 14685.0 ft Drilled to 15081.0 ft Drilled to 15385.0 ft Circulated at 15385.0 ft Pulled out of hole to 9850.0 ft Circulated at 9850.0 ft Pulled out of hole to 400.0 ft Pulled BHA Made up BHA no. 13 R.I.H. to 7740.0 ft Singled in drill pipe to 8661.0 ft R.I.H. to 9781.0 ft Serviced Block line R.I.H. to 15385.0 ft Drilled to 15568.0 ft Circulated at 15568.0 ft Circulated at 15568.0 ft Circulated at 15568.0 ft Pulled out of hole to 9761.0 ft Circulated at 9761.0 ft Circulated at 9761.0 ft Rest hole at 9761.0 ft Circulated at 9761.0 ft Rest hole at 9761.0 ft Circulated at 9761.0 ft Rest hole at 9761.0 ft Rest hole at 9761.0 ft Progress Report Facility PB U Pad Well U-02A Rig Nabors 9ES Page 5 Date 10 February 99 Date/Time 10:30-17:30 17:30-18:45 18:45-20:30 20:30-02:00 11 Jan 99 02:00-02:30 02:30-06:00 06:00-09:30 09:30-10:30 10:30-12:00 12:00-13:00 13:00-14:00 14:00-16:00 16:00-17:30 17:30-18:15 18:15-21:00 21:00-21:30 21:30-00:00 12 Jan 99 00:00-06:00 06:00-07:30 07:30-09:30 09:30-14:00 14:00-16:00 16:00-16:30 16:30-18:00 18:00-19:00 19:00-21:00 21:00-23:00 23:00-01:00 13 Jan 99 01:00-02:30 02:30-03:00 03:00-05:30 05:30-06:00 06:00-12:00 12:00-13:30 13:30-14:00 14:00-19:00 19:00-20:00 20:00-22:30 22:30-02:30 14 Jan 99 02:30-03:30 03:30-05:00 05:00-06:00 06:00-08:00 08:00-10:30 10:30-11:00 11:00-23:00 23:00-06:00 15 Jan 99 06:00-08:30 08:30-12:00 12:00-15:00 15:00-20:00 20:00-03:30 16 Jan 99 03:30-06:00 06:00-06:30 Duration 7hr 1-1/4 hr 1-3/4 hr 5-1/2 hr 1/2 hr 3-1/2 hr 3-1/2 hr 1 hr 1-1/2 hr 1 hr 1 hr 2 hr 1-1/2 hr 3/4 hr 2-3/4 hr 1/2 hr 2-1/2 hr 6 hr 1-1/2 hr 2 hr 4-1/2 hr 2 hr 1/2 hr 1-1/2 hr 1 hr 2 hr 2 hr 2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 6 hr 1-1/2 hr 1/2 hr 5 hr 1 hr 2-1/2 hr 4 hr 1 hr 1-1/2 hr 1 hr 2 hr 2-1/2 hr 1/2 hr 12hr 7 hr 2-1/2 hr 3-1/2 hr 3 hr 5 hr 7-1/2 hr 2-1/2 hr 1/2 hr Activity Pulled out of hole to 400.0 ft Pulled BHA Installed BOP test plug assembly Tested BOP stack Retrieved BOP test plug assembly Made up BHA no. 14 Made up BHA no. 14 (cont...) Circulated at 0.0 ft Pulled BHA Serviced Block line Pulled BHA Made up BHA no. 14 Singled in drill pipe to 1726.0 ft Repaired Draw works R.I.H. to 6200.0 ft Held safety meeting R.I.H. to 9828.0 ft R.I.H. to 14190.0 ft Washed to 14486.0 ft Rest hole at 14486.0 ft Washed to 15329.0 ft Drilled to 15628.0 ft Pulled out of hole to 15200.0 ft Circulated at 15200.0 ft Pulled out of hole to 14000.0 ft Rest hole at 14000.0 ft Circulated at 14000.0 ft Rest hole at 14000.0 ft Circulated at 14000.0 ft Pulled out of hole to 12800.0 ft Circulated at 12800.0 ft R.I.H. to 13770.0 ft Washed to 15547.0 ft Rest hole at 15547.0 ft Pulled out of hole to 15000.0 ft Circulated at 15000.0 ft R.I.H. to 15546.0 ft Mixed and pumped slurry - 50.000 bbl Pulled out of hole to 14000.0 ft Circulated at 14000.0 ft Circulated at 14000.0 ft Rest hole at 14000.0 ft Rest hole at 14000.0 ft (cont...) Circulated at 14000.0 ft Circulated at 14000.0 ft Backreamed to 12800.0 ft Worked stuck pipe at 12745.0 ft Rigged up Logging/braided cable equipment Circulated at 12745.0 ft Rigged up Logging/braided cable equipment Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations (cont...) Progress Report Facility PB U Pad Well U-02A Rig Nabors 9ES Page 6 Date 10 February 99 Date/Time 06:30-08:00 08:00-11:00 11:00-13:00 13:00-14:30 14:30-16:30 16:30-00:00 17 Jan 99 00:00-02:00 02:00-06:00 06:00-07:00 07:00-08:30 08:30-22:00 22:00-01:00 18 Jan 99 01:00-04:00 04:00-05:00 05:00-06:00 06:00-23:00 23:00-00:00 19 Jan 99 00:00-00:15 00:15-05:30 05:30-06:00 06:00-06:30 06:30-10:30 10:30-12:00 12:00-13:30 13:30-16:30 16:30-17:00 17:00-20:30 20:30-00:30 20 Jan 99 00:30-01:30 01:30-03:00 03:00-03:45 03:45-06:00 06:00-06:30 06:30-09:45 09:45-11:00 11:00-12:00 12:00-14:00 14:00-15:00 15:00-16:30 16:30-20:00 20:00-22:00 22:00-23:00 23:00-06:00 21 Jan 99 06:00-06:15 06:15-07:00 07:00-09:00 09:00-10:00 10:00-15:00 15:00-19:30 19:30-21:00 21:00-22:00 22:00-03:00 22 Jan 99 03:00-04:30 04:30-06:00 Duration 1-1/2 hr 3hr 2 hr 1-1/2 hr 2 hr 7-1/2 hr 2 hr 4 hr 1 hr 1-1/2 hr 13-1/2 hr 3 hr 3 hr 1 hr 1 hr 17hr 1 hr 1/4 hr 5-1/4 hr 1/2 hr 1/2 hr 4 hr 1-1/2 hr 1-1/2 hr 3 hr 1/2 hr 3-1/2 hr 4 hr 1 hr 1-1/2 hr 3/4 hr 2-1/4 hr 1/2 hr 3-1/4 hr 1-1/4 hr 1 hr 2 hr 1 hr 1-1/2 hr 3-1/2 hr 2hr 1 hr 7 hr 1/4 hr 3/4 hr 2 hr 1 hr 5 hr 4-1/2 hr 1-1/2 hr 1 hr 5 hr 1-1/2 hr 1-1/2 hr Activity Worked stuck pipe at 10980.0 ft Conducted electric cable operations Circulated at 10868.0 ft Pulled out of hole to 9800.0 ft Serviced Block line Pulled out of hole to 0.0 ft Made up BHA no. 15 R.I.H. to 9800.0 ft Circulated at 9879.0 ft Washed to 10893.0 ft Fished at 10893.0 ft Rigged up Logging/braided cable equipment Conducted electric cable operations Rigged down Logging/braided cable equipment Worked stuck pipe at 10890.0 ft Jarred stuck pipe at 12893.0 ft Rigged up Lubricator Held safety meeting Conducted electric cable operations Rigged down Logging/braided cable equipment Rigged down Logging/braided cable equipment (cont...) Worked stuck pipe at 12667.0 ft Rigged up Logging/braided cable equipment Jarred stuck pipe at 12667.0 ft Conducted electric cable operations Circulated at 12667.0 ft Conducted electric cable operations Conducted electric cable operations Serviced Drilling tool / logs Conducted electric cable operations Serviced Drilling tool / logs Conducted electric cable operations Conducted electric cable operations (cont...) Serviced Logging/braided cable equipment Conducted electric cable operations Rigged down Logging/braided cable equipment Rigged up Logging/braided cable equipment Conducted electric cable operations Functioned Drilling tool / logs Conducted electric cable operations Serviced Top drive Worked stuck pipe at 12667.0 ft Conducted electric cable operations Conducted electric cable operations (cont...) Rigged down Lubricator Serviced Top drive Jarred stuck pipe at 12667.0 ft Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Serviced Grease head Conducted electric cable operations Jarred stuck pipe at 11014.0 ft Circulated at 11014.0 ft Progress Report Facility PB U Pad Well U-02A Rig Nabors 9ES Page 7 Date 10 February 99 Date/Time 23 Jan 99 24 Jan 99 25 Jan 99 26 Jan 99 27 Jan 99 06:00-07:30 07:30-08:00 08:00-10:00 10:00-13:00 13:00-13:15 13:15-13:30 13:30-13:45 13:45-14:00 14:00-15:00 15:00-15:30 15:30-16:00 16:00-16:30 16:30-18:30 18:30-19:30 19:30-06:00 06:00-08:30 08:30-09:00 09:00-09:30 09:30-10:30 10:30-14:30 14:30-15:00 15:00-15:30 15:30-18:30 18:30-01:30 01:30-02:00 02:00-03:30 03:30-06:00 06:00-06:00 06:00-20:30 20:30-22:00 22:00-22:15 22:15-01:30 01:30-01:45 01:45-02:00 02:00-06:00 06:00-08:00 08:00-09:00 09:00-14:00 14:00-16:30 16:30-17:00 17:00-22:30 22:30-01:30 01:30-02:00 02:00-06:00 06:00-10:30 10:30-12:00 12:00-12:15 12:15-13:30 13:30-13:45 13:45-14:00 14:00-18:00 18:00-19:00 19:00-21:30 21:30-22:00 Duration 1-1/2 hr 1/2 hr 2 hr 3 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1 hr 10-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1 hr 4 hr 1/2 hr 1/2 hr 3hr 7 hr 1/2 hr 1-1/2 hr 2-1/2 hr 24 hr 14-1/2 hr 1-1/2 hr 1/4 hr 3-1/4 hr 1/4 hr 1/4 hr 4hr 2 hr 1 hr 5 hr 2-1/2 hr 1/2 hr 5-1/2 hr 3 hr 1/2 hr 4 hr 4-1/2 hr 1-1/2 hr 1/4 hr 1-1/4 hr 1/4 hr 1/4 hr 4 hr 1 hr 2-1/2 hr 1/2 hr Activity Pulled Drillpipe in stands to 9880.0 ft Serviced Drillfloor / Derrick Ran Drillpipe to 11010.0 ft (4in OD) Circulated at 11010.0 ft Held safety meeting Mixed and pumped slurry - 32.000 bbl Displaced slurry - 86.000 bbl Rigged down High pressure lines Pulled Drillpipe in stands to 10300.0 ft Reverse circulated at 10300.0 ft Circulated at 10300.0 ft Pulled Drillpipe in stands to 9880.0 ft Serviced Block line Serviced Top drive Pulled Drillpipe in stands to 350.0 ft Pulled Drillpipe in stands to 350.0 ft (cont...) Retrieved B ore protector Installed BOP test plug assembly Repaired High pressure lines Tested BOP stack Retrieved BOP test plug assembly Installed Bore protector Made up BHA no. 16 R.I.H. to 10260.0 ft Circulated at 10260.0 ft Drilled cement to 10390.0 ft Drilled to 10430.0 ft Drilled to 11340.0 ft (cont...) Drilled to 11810.0 ft (cont...) Circulated at 11810.0 ft Flow check Pulled out of hole to 9880.0 ft Circulated at 9880.0 ft Flow check Pulled out of hole to 189.0 ft Pulled BHA Serviced Top drive Commissioned Additional services Made up BHA no. 17 Serviced Block line R.I.H. to 11724.0 ft Circulated at 11724.0 ft Washed to 11810.0 ft Drilled to 11865.0 ft Drilled to 11939.0 ft (cont...) Circulated at 11939.0 ft Flow check Pulled out of hole to 9880.0 ft Circulated at 9880.0 ft Flow check Pulled out of hole to 215.0 ft Pulled BHA Made up BHA no. 18 Serviced Top drive Facility PB U Pad Progress Report Well U-02A Rig Nabors 9ES Page Date 8 10 February 99 Date/Time 28 Jan 99 29 Jan 99 30 Jan 99 31 Jan 99 01 Feb 99 02 Feb 99 22:00-00:00 00:00-00:30 00:30-04:00 04:00-06:00 06:00-09:00 09:00-10:00 10:00-01:15 01:15-06:00 06:00-10:00 10:00-21:30 21:30-22:00 22:00-22:30 22:30-23:00 23:00-01:00 01:00-02:00 02:00-03:00 03:00-03:30 03:30-04:00 04:00-06:00 06:00-06:30 06:30-07:00 07:00-10:30 10:30-11:30 11:30-12:30 12:30-14:00 14:00-15:30 15:30-16:00 16:00-17:00 17:00-17:30 17:30-20:30 20:30-22:30 22:30-02:30 02:30-04:30 04:30-05:00 05:00-05:30 05:30-06:00 06:00-08:30 08:30-11:30 11:30-19:00 19:00-21:00 21:00-22:30 22:30-02:30 02:30-03:30 03:30-06:00 06:00-06:30 06:30-08:30 08:30-10:30 10:30-18:30 18:30-19:30 19:30-00:00 00:00-02:00 02:00-06:00 06:00-08:00 08:00-09:00 Duration 2 hr 1/2 hr 3-1/2 hr 2 hr 3 hr lhr 15-1/4 hr 4-3/4 hr 4 hr 11-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1 hr 1 hr 1/2 hr 1/2 hr 2 hr 1/2 hr 1/2 hr 3-1/2 hr 1 hr 1 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1 hr 1/2 hr 3 hr 2hr 4 hr 2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 3 hr 7-1/2 hr 2hr 1-1/2 hr 4 hr 1 hr 2-1/2 hr 1/2 hr 2 hr 2 hr 8 hr 1 hr 4-1/2 hr 2 hr 4 hr 2 hr 1 hr Activity R.I.H. to 4904.0 fl Held safety meeting R.I.H. to 11939.0 fl Drilled to 12020.0 ft Drilled to 12180.0 fit (cont...) Serviced Instrument lines Drilled to 12707.0 fit Worked toolstring at 12707.0 ft Worked toolstring at 12707.0 ft (cont...) Drilled to 13055.0 fit Rest hole at 13055.0 ft Circulated at 13055.0 ft Circulated at 13055.0 ft Pulled out of hole to 9880.0 fit Serviced Top drive Circulated at 9880.0 ft Circulated at 9880.0 ft Serviced Internal BOPs R.I.H. to 12500.0 fit R.I.H. to 13022.0 fit (cont...) Washed to 13055.0 ft Drilled to 13150.0 ft Circulated at 13150.0 ft Rest hole at 13100.0 ft Circulated at 13100.0 fit Rest hole at 13100.0 fit Circulated at 13100.0 fit Pulled out of hole to 9880.0 fit Flow check Pulled out of hole to 7700.0 fit Circulated at 7700.0 ft Pulled out of hole to 217.0 ft Pulled BHA Retrieved B ore protector Installed BOP test plug assembly Tested BOP stack Tested BOP stack (cont...) Made up BHA no. 19 R.I.H. to 9800.0 fl Circulated at 9800.0 fit Serviced Block line R.I.H. to 13150.0 ft Drilled to 13195.0 fit Pulled out of hole to 9880.0 fit Pulled BHA Repaired Top drive R.I.H. to 13.0 ft Drilled to 13430.0 fit Pulled out of hole to 12464.0 ft Pulled out of hole to 9600.0 ft Circulated at 9600.0 ft Pulled out of hole to 225.0 fit Pulled BHA Made up BHA no. 20 Progress Report Facility PB U Pad Well U-02A Rig Nabors 9ES Page 9 Date 10 February 99 Date/Time 09:00-14:00 14:00-16:30 16:30-18:00 18:00-20:30 20:30-22:00 22:00-00:30 03 Feb 99 00:30-02:00 02:00-02:30 02:30-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-08:30 08:30-09:00 09:00-10:00 10:00-11:30 11:30-14:00 14:00-15:00 15:00-15:30 15:30-00:30 04 Feb 99 00:30-01:30 01:30-02:30 02:30-06:00 06:00-10:00 10:00-11:00 11:00-17:00 17:00-18:30 18:30-21:30 21:30-00:30 05 Feb 99 00:30-01:00 01:00-06:00 06:00-13:30 13:30-16:30 16:30-17:30 17:30-19:00 19:00-20:30 20:30-22:30 22:30-00:00 06 Feb 99 00:00-05:00 05:00-06:00 06:00-08:30 08:30-09:00 09:00-10:00 10:00-14:00 14:00-16:00 16:00-18:30 18:30-19:00 Duration 5 hr 2-1/2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1 hr 1 hr 1 hr 2-1/2 hr 1/2 hr 1 hr 1-1/2 hr 2-1/2 hr 1 hr 1/2 hr 9 hr 1 hr 1 hr 3-1/2 hr 4 hr 1 hr 6 hr 1-1/2 hr 3 hr 3 hr 1/2 hr 5 hr 7-1/2 hr 3 hr 1 hr 1-1/2 hr 1-1/2 hr 2 hr 1-1/2 hr 5 hr 1 hr 2-1/2 hr 1/2 hr 1 hr 4 hr 2 hr 2-1/2 hr 1/2 hr Activity R.I.H. to 9600.0 ft Circulated at 9600.0 ft R.I.H. to 13062.0 ft Circulated at 13062.0 ft Circulated at 13062.0 ft Pulled out of hole to 12311.0 ft Pulled out of hole to 9600.0 ft Flow check Circulated at 9600.0 ft R.I.H. to 10289.0 ft Worked stuck pipe at 10289.0 ft Pulled out of hole to 9600.0 ft Circulated at 9600.0 ft R.I.H. to 10289.0 ft Washed to 10289.0 ft Pumped out of hole to 9600.0 ft Circulated at 9600.0 ft Pulled out of hole to 8000.0 fi R.I.H. to 9600.0 ft Circulated at 9600.0 ft Pulled out of hole to Pulled out of hole to Laid down 3000.0 ft Laid down 7000.0 ft Pulled BHA Laid down 3000.0 ft Serviced Block line 9400.0 ft 8500.0 ft of 4in OD drill pipe of 4in OD drill pipe of 4in OD drill pipe Laid down 2500.0 ft of 4in OD drill pipe Installed Completion string handling equipment Held safety meeting Ran Tubing to 3000.0 ft (4-1/2in OD) Ran Tubing to 9843.0 ft (4-1/2in OD) Circulated at 9843.0 ft Ran Tubing to 9843.0 ft (4-1/2in OD) Circulated at 9843.0 ft Set packer at 9544.0 ft with 4000.0 psi Tested Casing Installed Hanger plug Rigged down BOP stack Rigged up Tubing head spool Rigged up Adapter spool Tested Xmas tree equipment Removed Hanger plug Circulated at 3167.0 ft Flow check Installed Hanger plug Rig moved 0.00 % Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_ WOA U Pad, Slot U-O2A U-O2A Job No. AKMW90047, Surveyed: 1 February, 1999 SURVEY REPORT 15 March, 1999 ORIGINAL Your Reft API-500292117001 KBE-76.54 Surface Coordinates: 5960810.00 N, 631565.00 E (70° 18' 03.6458" N, 148° 56' 03.7436" W) Kelly Bushing: 77.50ft above Mean Sea Level Survey Ref: svy8357 Sperry-Sun Drilling Services Survey Report for U-O2A Your Ref: API-500292117001 Job No. AKMW90047, Surveyed: 1 February, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 10217.15 10264.69 10310.76 10354.55 10387.13 10412.51 10444,32 10480.61 10507.72 1O542.97 10574.02 10602.81 10637.14 1O669.08 10698.62 10729.19 10789.49 1O821.O0 10851.74 10883.17 10916.11 10946.31 1O975.66 11007.53 11038.90 85.170 87.440 92.370 92.090 91.600 89.540 86.860 84.170 82.930 82.410 81.800 81.420 82.350 84.330 87.440 90.520 90.370 92.520 94.350 94.280 95.200 95.310 95.330 96.780 97.910 Azim. 354.65O 354.540 355.850 355.100 354.720 351.780 347.760 342.42O 338.910 335.470 332.750 329.480 323.360 321.910 318,970 317.200 315.880 316.170 318.520 318,240 319.570 320.010 321.590 322.030 322,520 Sub-Sea Depth (ft) 8890.02 8893.09 8893.16 8891.46 8890.41 8890.16 8891.16 8894.00 8897.04 8901.54 8905.81 8910.01 8914.86 8918.56 8920.68 8921.23 8920.76 8919.96 8918.12 8915.76 8913.03 8910.27 8907.55 8904.19 8900.18 Vertical Depth (ft) 8967.52 8970.59 8970.66 8968.96 8967.91 8967.66 8968.66 8971.50 8974.54 8979.04 8983.31 8987.51 8992.36 8996.06 8998.18 8998.73 8998.26 8997.46 8995.62 8993.26 8990.53 8987.77 8985.05 8981.69 8977.68 Local Coordinates Global Coordinates Northings Eastings Northings Easflngs (ft) (ft) (ft) (ft) 2678.39 N 2802.09W 5963438.91 N 628716.44 E 2725.61N 2806,56W 5963486.05 N 628711.14 E 2771.51 N 2810.42W 5963531.87 N 628706.48 E 2815.13 N 2813.87W 5963575.42 N 628702.27 E 2847,56 N 2816.76W 5963607.80 N 628698,81 E 2872.76 N 2819.74W 5963632,95 N 628695.39 E 2904.04 N 2825.39W 5963664.12 N 628689.20 E 2938.98 N 2834.69W 5963698.90 N 628679.28 E 2964.40 N 2843,61W 5963724.15 N 628669.92 E 2996.62 N 2857,16W 5963756.13 N 628655.81 E 3024.29 N 2870.58W 5963783.56 N 628641,90 E 3049.22 N 2884.34W 5963808.25 N 628627.71 E 3077.52 N 2903.13W 5963836.22 N 628608,43 E 3102,73 N 2922.38W 5963861,09 N 628588.74 E 3125.44 N 2941.14W 5963883.47 N 628569.58 E 3148.18 N 2961.56W 5963905.85 N 628548,77 E 3191.95 N 3003.04W 5963948.88 N 628506.54 E 3214,62 N 3024,91W 5963971.16 N 628484.27 E 3237.18 N 3045,70W 5963993.36 N 628463.09 E 3260.61 N 3066,51W 5964016.42 N 628441,87 E 3285,35 N 3088,09W 5964040.78 N 628419.86 E 3308.32 N 3107.50W 5964063,40 N 628400.05 E 3330.96 N 3125.97W 5964085.72 N 628381,18 E 3355.87 N 3145.57W 5964110.28 N 628361.16 E 3380,48 N 3164.60W 5964134,55 N 628341.69 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Rate (°/100ft) Vertical Section (ft) Comment 4.781 11.072 1.827 1.9o3 14.144 15.182 16.435 13.654 9.791 8.897 11.314 17.855 7.665 14.469 11.620 2.203 6.885 9.678 0.916 ,4.898 1.496 5.361 4.752 3.921 3755.89 3782,96 3808.84 3833.25 3851.69 3866.65 3886,92 3912,17 3932.42 396O.04 3985.31 4009.54 4039.80 4068.94 4096,43 4125.38 4183,00 4213.18 4242.37 4272,00 4302,94 4331,13 4358.33 4387,63 4416.29 TIE-ON SURVEY WINDOW POINT Continued... 15 March, 1999- 9:13 - 2- DrlllQuest Sperry-Sun Drilling Services Survey Report for U-O2A Your Ref: A PI-500292117001 Job No, AKMW90047, Surveyed: 1 February, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 11067.39 11099.69 11129,48 11161.65 11199.16 11224.81 11256.76 11286.32 11318.42 11346.98 11384.13 11411.83 11439.50 11472.4o 11505.84 11536.65 11567.26 11598.62 11627.82 11658.90 11692.99 11722.46 11753.90 11784.43 11816.57 97.740 97.570 97.630 97.250 96.570 96.600 96.21o 95.640 95.540 95.15o 95.800 96.170 96.01o 95.700 95.330 95.580 93.17o 90.340 90.220 91.72o 92.550 92.12o 92.530 90.490 90.030 Azim. 323.440 322.160 323.490 322.560 320.380 318.820 319.670 319.350 319.89o 319.130 319.640 319.350 319.490 320.230 321.190 321.010 322.11o 321.630 322.310 322.690 322.290 321.74o 321.360 322.430 321.060 Sub-Sea Depth (ft) 8896.30 8891.99 8888.05 8883.89 8879.37 8876.43 8872.87 8869.82 8866.69 8864.03 8860.49 8857.60 8854.66 8851.31 8848.09 8845.16 8842.83 8841.87 8841.72 8841.20 8839.93 8838.73 8837.45 8836.65 8836.50 Vertical Depth (ft) 8973.80 8969.49 8965.55 8961.39 8956.87 8953.93 8950.37 8947.32 8944.19 8941.53 8937.99 8935.10 8932.16 8928.81 8925.59 8922.66 8920.33 8919.37 8919.22 8918.70 8917.43 8916.23 8914.95 8914.15 8914.00 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3403.01 N 3181.60W 5964156.78 N 628324.30 E 3428.51N 3200.95W 5964181.94 N 628304.51E 3452.04 N 3218.79W 5964205.15 N 628286.26 E 3477.52 N 3237.98W 5964230.29 N 628266.63 E 3506.65 N 3261.17W 5964259.01N 628242.93 E 3526.05 N 3277.69W 5964278.12 N 628226.07 E 3550.11N 3298.42W 5964301.81N 628204.93 E 3572.47 N 3317.51W 5964323.83 N 628185.45 E 3596.80 N 3338.20W 5964347.80 N 628164.33 E 3618.43 N 3356.67W 5964369.10 N 628145.49 E, 3646.50 N 3380.74W 5964396.75 N 628120.93 E 3667.45 N 3398.63W 5964417.38 N 628102.67 E 3688.34 N 3416.53W 5964437.96 N 628084.41 E 3713.36 N 3437.63W 5964462.60 N 628062.88 E 3739.12 N 3458.71W 5964487.99 N 628041.35 E 3762.99 N 3477.97W 5964511.52 N 628021.68 E 3786.90 N 3496.94W 5964535.09 N 628002.29 E 3811.55 N 3516.29W 5964559.40 N 627982.51E 3834.55 N 3534.28W 5964582.08 N 627964.12 E 3859.20 N 3553.20W 5964606.40 N 627944.77 E 3886.23 N 3573.94W 5964633.05 N 627923.56 E 3909.43 N 3592.06W 5964655.94 N 627905.03 E 3934.04 N 3611.60W 5964680.20 N 627885.07 E 3958.05 N 3630.43W 5964703.88 N 627865.82 E 3983.29 N 3650.33W 5964728.76 N 627845.48 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/100fi) (fi) Comment 3.254 4442.16 3.963 4471.54 4.430 4498.63 3.100 4527.85 6.048 4562.35 6.043 4586.27 2.912 4616.13 2.209 4643.74 1.703 4673.71 2.981 4700.41 2.220 4735.16 1.694 4761.03 0.766 4786.88 2.428 4817.55 3.064 4848.55 0.998 4877.05 8.650 4905.31 9.153 4934.27 2.365 4961.23 4.979 4989.81 2.702 5021.15 2.368 5048.33 1.777 5077.42 7.545 5105.61 4.496 5135.34 Continued,.. 15 March, 1999 - 9:13 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for U-O2A Your Ref: API-500292117001 Job No, AKMW90047, Surveyed: 1 February, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 1184o.77 11872.76 119o8.65 11934.25 11969.49 11999.91 12029.48 12o63.61 12094.65 12121.31 12156.1o 12186.78 12219.13 12251.60 12280.66 12311.65 12343.41 12372.28 12404.37 12437.35 12465.87 12500.61 12530.98 12560.46 12594.24 89.910 91.27o 92.o3o 92.290 92.350 92.990 93.500 92.650 92.290 9o.120 86.540 85.670 85.590 83.970 84.31o 86.91o 87.560 88.180 89.690 89.290 89.970 93.060 92.960 93.220 93.110 Azim. 321.04o 321.2oo 322.280 321.69o 317.79o 314.07o 311.55o 307.360 305.330 305.840 3o3.790 3o2.61o 300.780 297.460 296.15o 294.91o 295.690 295.14o 294.040 293.700 293.070 293.870 294.260 293.060 290.550 Sub-Sea Depth (ft) 8836.51 8836.19 8835.15 8834.19 8832.76 8831.34 8829.67 8827.84 8826.50 8825.94 8826.95 8829.04 8831.50 8834.46 8837.42 8839.80 8841.33 8842.40 8843.00 8843.29 8843.47 8842.56 8840.96 8839.37 8837.51 Vertical Depth (ft) 8914.01 8913.69 8912.65 8911.69 8910.26 8908.84 8907.17 8905.34 8904.00 8903.44 8904.45 8906.54 8909.00 8911.96 8914.92 8917.30 8918.83 8919.90 8920.50 8920.79 8920.97 8920.06 8918.46 8916.87 8915.01 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 4002.11N 3665.54W 5964747.31N 627829.94 E 4027.01N 3685.62W 5964771.86 N 627809.43 E 4055.18 N 3707.84W 5964799.63 N 627786.73 E 4075.33 N 3723.59W 5964819.51 N 627770.62 E 4102.20 N 3746.34W 5964845.97 N 627747.40 E 4124.03 N 3767.47W 5964867.43 N 627725.89 E 4144.09 N 3789.13W 5964887.11N 627703.89 E 4165.74 N 3815.44W 5964908.29 N 627677.21 E 4184.12 N 3840.42W 5964926.23 N 627651.91E 4199.63 N 3862.09W 5964941.36 N 627629.97 E. 4219.48 N 3890.63W 5964960.71N 627601.08 E 4236.24 N 3916.25W 5964977.02 N 627575.18 E 4253.18 N 3943.69W 5964993.48 N 627547.44 E 4268.92 N 3971.93W 5965008.72 N 627518.93 E 4281.95 N 3997.73W 5965021.30 N 627492.90 E 4295.27 N 4025.61W 5965034.12 N 627464.80 E 4308.83 N 4054.29W 5965047.18 N 627435.88 E 4321.21 N 4080.35W 5965059.10 N 627409.61 E 4334.56 N 4109.52W 5965071.94 N 627380.21E 4347.90 N 4139.68W 5965084.75 N 627349.82 E 4359.22 N 4165.86W 5965095.61 N 627323.45 E 4373.05 N 4197.71W 5965108.88 N 627291.36 E 4385.42 N 4225.40W 5965120.76 N 627263.46 E 4397.23 N 4252.36W 5965132.10 N 627236.29 E 4409.76 N 4283.68W 5965144.08 N 627204.77 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/lOOft) (fi) Comment 0.503 5157.83 4.281 5187.54 3.679 5220.72 2.517 5244.34 11.o59 5277.35 12.395 5306.47 8.682 5335.18 12.509 5368.73 6.636 5399.51 8.361 5426.Ol 11.856 5460.62 4.771 5491.16 5.646 5523.39 11.339 5555.72 4.634 5584.60 9.290 5615.43 3.195 5647.07 2.870 5675.85 5.821 5707.82 1.592 5740.64 3.250 5769.Ol 9.188 5803.54 1.324 5833.74 4.159 5863.03 7.426 5896.46 Continued... 15 March, 1999 - 9:13 - 4 - DrillQuest Sperry-Sun Drilling Services Survey Report for U-O2A Your Ref: API-500292117001 Job No. AKMW90047, Surveyed: 1 February, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 12625.40 12660.52 12686.97 12721.2o 12752.36 12779.88 12811.89 12842.04 12875.92 12907.78 12938.58 12968.54 13000.49 13032.70 13062.12 13095.o9 13123.36 13150.23 13192.64 13221.94 13246.46 13278.40 13308.63 13340.00 13372.03 92.870 92.940 91.o8o 88.950 87.560 87.OLO 85.960 85.490 85.330 85.240 85.430 85.740 85.980 85.740 85.250 84.080 83.690 83.880 84.000 84.130 84.030 84.250 84.270 84.160 84.460 Azim. 290.680 290.61o 291.51o 291.55o 291.130 290.870 290.370 290.290 290.790 289.780 289.760 289.980 290.210 289.490 289.070 288.210 287.400 287.490 287.800 287.960 287.860 287.280 287.350 287.180 285.440 Sub-Sea Depth (ft) 8835.88 8834.10 8833.17 8833.17 8834.11 8835.42 8837.38 8839.63 8842.34 8844.96 8847.46 8849.77 8852.08 8854,40 8856,71 8859.78 8862.79 8865.70 8870.17 8873.20 8875.73 8878.99 8882.02 8885.18 8888.36 Vertical Depth (ft) 8913.38 8911.60 8910.67 8910.67 8911.61 8912.92 8914.88 8917.13 8919.84 8922.46 8924.96 8927.27 8929.58 8931.90 8934.21 8937.28 8940.29 8943.20 8947.67 8950.70 8953.23 8956.49 8959.52 8962.68 8965.86 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 4420.71 N 4312.80 W 5965154.52 N 627175.45 E 4433.08 N 4345.62 W 5965166.31 N 627142.42 E 4442.58 N 4370.29 W 5965175.38 N 627117.59 E 4455.14 N 4402.13W 5965187.38 N 627085.54 E 4466.47 N 4431.14W 5965198.20 N 627056.33 E 4476.33 N 4456.80W 5965207.60 N 627030.50 E 4487.58 N 4486.71W 5965218.33 N 627000.41 E 4498.02 N 4514.90W 5965228.28 N 626972.04 E 4509.87 N 4546.52W 5965239.57 N 626940.21 E 4520.88 N 4576.31W 5965250.06 N 626910.24 E, 4531.26 N 4605.19W 5965259.93 N 626881.17 E 4541.42 N 4633.29W 5965269.59 N 626852.91E 4552.36 N 4663.21W 5965280.02 N 626822,79 E 4563.27 N 4693.43W 5965290.39 N 626792.39 E 4572.96 N 4721.11W 5965299.59 N 626764.54 E 4583.45 N 4752.22W 5965309.54 N 626733.26 E 4592.04 N 4778.98W 5965317.66 N 626706.35 E 4600.05 N 4804.46W 5965325.22 N 626680.73 E 4612.84 N 4844.65W 5965337.30 N 626640.32 E 4621.78 N 4872.39W 5965345.76 N 626612.43 E 4629.28 N 4895.60W 5965352.85 N 626589.10 E 4638.88 N 4925.89W 5965361.91N 626558.64 E 4647.83 N 4954.60W 5965370.36 N 626529.78 E 4657.09 N 4984.41W 5965379.10 N 626499.81 E 4666.04 N 5014.99W 5965387.52 N 626469.07 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/lOOfl) (fi) Comment 0,876 5927.21 0.282 5961,88 7,811 5988,04 6.224 6021,94 4.660 6052.78 2.21o 6079.97 3,632 6111.55 1.581 6141.24 1.545 6174.61 3.172 6205.96 0,620 6236.23 1.268 6265.69 1.039 6297.14 2.351 6328.82 2.191 6357.69 4.397 6389.94 3.165 6417.48 0.782 6443.61 0.780 6484.90 0.701 6513.46 0.575 6537.36 1.933 6568.46 0.240 6597.87 0.643 6628.39 5.486 6659.43 Continued... 15 March, 1999 - 9:13 - 5 - DrlllQuest Sperry-Sun Drilling Services Survey Report for U-O2A Your Ref: API-500292117001 Job No. AKMW90047, Surveyed: 1 February, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northlngs Eastings (ft) (ft) (ft) (ft) 13429.00 84.460 285.440 8893.86 8971.36 4681.14 N 5069.65 W 5965401.65 N 626414.16 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.630° (01-Feb-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 299.390° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13429.00ft., The Bottom Hole Displacement is 6900.32ft., in the Direction of 312.718° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 10217.15 8967.52 2678.39 N 2802.09 W TIE-ON SURVEY 10264.69 8970.59 2725.61 N 2806.56 W WINDOW POINT 13429.00 8971.36 4681.14 N 5069.65 W PROJECTED SURVEY Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/lOOft) (ft) Comment 0.000 6714.46 PROJECTED SURVEY 15 March, 1999 - 9:13 - 6 - DrlllQuest Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_ WOA U Pad, Slot U-O2A U-O2APB1 Job No. AKMW90047, Surveyed: 9 January, 1999 ORIGINAL SURVEY REPORT 3 March, 1999 Your Reft API-500292117070 KBE-76.54 Surface Coordinates: 5960810.00 N, 631565.00 E (70° 18' 03.6458" N, 148° 56' 03.7436" W) Survey Ref: svy6484 Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 9791.54 9879.oo 991o.13 9939.17 9968.33 9998.35 10031.06 10062.1 o 10092.16 1 o 123.79 1 o 154.06 10185.00 lO217.15 10264.69 1031 o.76 10404.12 10497.04 10588.22 10683.33 10776.38 10869.46 1 o9o2.46 10931.03 10963.62 1 lO56.24 28.120 27.580 30.840 36.430 42.930 49.090 56.210 63.420 70.150 76.270 82.010 83.160 85.170 86.710 88.250 85.110 83.310 84.060 86.250 89.050 94.740 97.400 97.890 98.610 100.420 Azim. 314.98o 315.760 318.13o 319.800 321.14o 329.21o 329.460 333.200 337.430 343.16o 347.600 351.6oo 354.650 354.760 354.560 352.570 351.18o 350.360 349.980 349.020 344.560 344.280 343.450 343.940 343.4o0 Sub-Sea Depth (ft) 8648.68 8726.01 8753.18 8777.35 8799.78 8820.64 8840.47 8856.07 8867.92 8877.05 8882.76 8886.75 8890.02 8893.39 8895.41 8900.82 8910.19 8920.22 8928.26 8932.07 8928.99 8925.50 8921.70 8917.03 8901.72 Vertical Depth (ft) 8726.18 8803.51 8830.68 8854.85 8877.28 8898.14 8917.97 8933.57 8945.42 8954.55 8960.26 8964.25 8967.52 8970.89 8972.91 8978.32 8987.69 8997.72 9005.76 9009.57 9006.49 9003.00 8999.20 8994.53 8979.22 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 2403.83 N 2663.80W 5963166.82 N 628859.52 E 2432.90 N 2692.50W 5963195.39 N 628830.31 E 2444.01 N 2702.86W 5963206.31 N 628819.76 E 2456.15 N 2713.40W 5963218.26 N 628809.01 E 2470.51N 2725.24W 5963232.42 N 628796.92 E 2488.25 N 2737.48W 5963249.94 N 628784.37 E 2510.60 N 2750.73W 5963272.05 N 628770.73 E 2534.14 N 2763.56W 5963295.36 N 628757.49 E 2559.23 N 2775.07W 5963320.25 N 628745.55 E 2587.72 N 2785.24W 5963348.55 N 628734.87 E 2616.47 N 2792.73W 5963377.17 N 628726.88 E 2646.64 N 2798.27W 5963407.24 N 628720.82 E 2678.39 N 2802.09W 5963438.91 N 628716.44 E 2725.60 N 2806.47W 5963486.04 N 628711.24 E 2771.43 N 2810.75W 5963531.79 N 628706.15 E 2864.03 N 2821.19W 5963624.19 N 628694.09 E 2955.54 N 2834.26W 5963715.46 N 628679.43 E 3044.99 N 2848.79W 5963804.64 N 628663.33 E 3138.36 N 2864.97W 5963897.72 N 628645.51 E 3229.77 N 2881.91W 5963988.81 N 628626.98 E 3320.28 N 2903.15W 5964078.94 N 628604.15 E 3351.88 N 2911.97W 5964110.38 N 628594.79 E 3379.08 N 2919.84W 5964137.44N 628586.45 E 3410.04 N 2928.89W 5964168.23 N 628576.85 E 3497.70 N 2954.57W 5964255.43 N 628549.64 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Rate (°ll00ff) Vertical Section (ft) Comment 0.745 11.11o 19.5o9 22.482 28.168 21.775 25.450 25.849 25.977 23.81o 13.348 11.32o 3.248 3.371 3.980 2.443 1.215 2.337 3.181 7.764 8.1o5 3.351 2.664 2.037 3500.65 3539.93 3554.40 3569.55 3586.90 3606.28 3628.79 3651.52 3673.86 3696.71 3717.34 3736.97 3755.89 3782.87 3809.09 3863.63 3919.92 3976.49 4o36.41 4096.03 4158.95 4182.14 4202.34 4225.42 4290.82 TIE-ON POINT WINDOW POINT Continued... 3 March, 1999 - 10:39 - 2 - DrlllQuest Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 11152.2o 11245.85 11338.68 11429.o8 11453.44 11486.04 11516.36 11546.35 11577.25 116o8.7o 11639.51 11670.97 117Ol.9O 11733.50 11768.26 11798.75 11824.09 11862.58 11893.75 11920.68 11956.49 11987.85 12o15.16 121 o8.22 12197.36 99.980 98.370 99.760 98.170 96.1 oo 93.280 9o.68o 87.780 86.14o 84.300 81.17o 81.o50 80.990 8o.510 79.860 80.71 o 81.17o 82.770 83.300 82.740 81.99o 81.49o 81.46o 83.490 86.1oo Azim. 341.22o 340.13o 339.09o 338.150 337.31o 335.940 335.420 336.000 336.960 335.890 336.420 336.660 335.550 333.520 329.990 327.18o 323.780 319.390 316.060 312.95o 308.990 307.940 308.050 305.700 303.240 Sub-Sea Depth (ft) 8884.72 8869.79 8855.16 8841.08 8838.05 8835.38 8834.34 8834.74 8836.38 8839.00 8842.90 8847.76 8852.58 8857.66 8863.59 8868.74 8872.73 8878.11 8881.89 8885.16 8889.92 8894.43 8898.48 8910.66 8918.75 Vertical Depth (ft) 8962.22 8947.29 8932.66 8918.58 8915.55 8912.88 8911.84 8912.24 8913.88 8916.50 8920.40 8925.26 8930.08 8935.16 8941.09 8946.24 8950.23 8955.61 8959.39 8962.66 8967.42 8971.93 8975.98 8988.16 8996.25 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3587.67 N 2983.27W 5964344.88 N 628519.37 E 3674.91 N 3013.86W 5964431.57 N 628487.25 E 3760.83 N 3045.80W 5964516.92 N 628453.82 E 3843.98 N 3078.35W 5964599.49 N 628419.81E 3866.34 N 3087.51W 5964621.69 N 628410.26 E 3896.16 N 3100.40W 5964651.28 N 628396.85 E 3923.77 N 3112.88W 5964678.67 N 628383.89 E 3951.10 N 3125.22W 5964705.78 N 628371.08 E 3979.39 N 3137.53W 5964733.85 N 628358.27 E 4008.12 N 3150.06W 5964762.35 N 628345.24 E 4036.07 N 3162.42W 5964790.08 N 628332.40 E 4064.58 N 3174.79W 5964818.37 N 628319.53 E 4092.51 N 3187.17W 5964846.08 N 628306.66 E 4120.67 N 3200.57W 5964874.00 N 628292.76 E 4150.84 N 3216.78W 5964903.88 N 628276.03 E 4176.48 N 3232.44W 5964929.24 N 628259.92 E 4197.10 N 3246.62W 5964949.61N 628245.39 E 4226.95 N 3270.30W 5964979.04 N 628221.19 E 4249.84 N 3291.11W 5965001.56 N 628199.98 E 4268.57 N 3310.17W 5965019.96 N 628180.60 E 4291.84 N 3336.96W 5965042.75 N 628153.40 E 4311.14 N 3361.26W 5965061.63 N 628128.77 E 4327.77 N 3382.55W 5965077.88 N 628107.19 E 4383.12 N 3456.34W 5965131.93 N 628032.44E 4433.35 N 3529.52W 5965180.87 N 627958.40 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/100ft) (ft) Comment 2.282 4359.97 2.068 4429.44 1.862 4499.44 2.037 4568.61 9.160 4587.56 9.611 4613.43 8.745 4637.85 9.861 4662.01 6.148 4686.62 6.762 4711.64 10.301 4736.12 0.845 4760.89 3.550 4785.38 6.520 4810.88 10.180 4839.81 9.502 4866.04 13.374 4888.51 12.034 4923.79 10.740 4953.16 11.650 4978.96 11.159 5013.72 3.677 5044.37 0.413 5071.07 3.320 5162.53 4.016 5250.94 Continued... 3 March, 1999 - 10:39 - 3- DrlllQuest Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 12290.19 12382.78 12419.27 12449.65 12478.14 12526.37 12557.63 12587.42 12620.68 12652.26 12682.08 12712.58 12745.30 12771.29 12803.98 12838.77 12864.73 12896.48 12932.46 12958.19 13025.59 13052.20 13145.31 13238.86 13275.67 87.530 87.10o 86.970 87.740 87.560 91.29o 92.920 95.260 98.18o 98.330 96.630 95.740 95.620 96.130 95.940 95.700 96.770 97.180 97.060 98.210 98.950 98.910 98.420 96.160 92.520 Azim. 300.830 297.440 293.690 293.240 292.760 290.650 288.610 286.420 284.800 282,430 279.580 277.940 277.780 277.320 276.170 276.430 276.140 276.570 277.170 275.960 276.780 276.900 278.890 279.400 280.650 Sub-Sea Depth (ft) 8923.91 8928.25 8930.14 8931.54 8932.71 8933.19 8932.04 8929.92 8926.03 8921.49 8917.61 8914.32 8911.08 8908.42 8904.99 8901.46 8898.64 8894.78 8890.32 8886.91 8876.85 8872.72 8858.69 8846.82 8844.04 Vertical Depth (ft) 9001.41 9005.75 9007.64 9009.04 9010.21 9010.69 9009.54 9007.42 9003.53 8998.99 8995.11 8991.82 8988.58 8985.92 8982.49 8978.96 8976.14 8972.28 8967.82 8964.41 8954.35 8950.22 8936.19 8924.32 8921,54 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 4482.51 N 3608.08W 5965228.65 N 627878.98 E 4527.54 N 3688.86W 5965272.25 N 627797.43 E 4543.26 N 3721.73W 5965287.40 N 627764.29 E 4555.34 N 3749.56W 5965298.99 N 627736.25 E 4566.46 N 3775.77W 5965309.65 N 627709.86 E 4584.30 N 3820.56W 5965326.70 N 627664.75 E 4594.79 N 3849.98W 5965336.67 N 627635.15 E 4603.73 N 3878.32W 5965345.12 N 627606.67 E 4612.62 N 3910.13W 5965353.45 N 627574.71E 4619.98 N 3940.50W 5965360.27 N 627544.21E 4625.62 N 3969.52W 5965365.41N 627515.10 E 4630.24 N 3999.48W 5965369.50 N 627485.06 E 4634.69 N 4031.74W 5965373.38 N 627452.73 E 4638.09 N 4057.37W 5965376.33 N 627427.04 E 4641.90 N 4089.65W 5965379.58 N 627394.70 E 4645.70 N 4124.05W 5965382.78 N 627360.24 E 4648.53 N 4149.70W 5965385.16 N 627334.54 E 4652.02 N 4181.02W 5965388.09 N 627303.16 E 4656.29 N 4216.47W 5965391.74 N 627267.65 E 4659.20 N 4241.80W 5965394.22 N 627242.27 E 4666.60 N 4308.04W 5965400.45 N 627175.91 E 4669.73 N 4334.14W 5965403.12 N 627149.76 E 4682.37 N 4425.31W 5965414.17 N 627058.39 E 4697.12 N 4516.91W 5965427.31 N 626966.53 E 4703.51 N 4553.05W 5965433.06 N 626930.29 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/lOOff) (fi) Comment 3.015 5343.52 3.687 5436.00 lO.269 5472.35 2.935 5502.53 1.798 5530.82 8.885 5578.61 8.350 5609.39 10.745 5638.47 10.023 5670.54 7.442 5700.62 11.058 5728.67 6.090 5757.04 0.609 5787.33 2.636 5811.33 3.546 5841.33 1.014 5873.17 4.269 5896.91 1.864 5925.91 1.688 5958.89 6.458 5982.39 1.629 6043.73 0.470 6068.01 2.177 6153.65 2.476 6240.70 10.452 6275.33 Continued... 3 March, 1999 - 10:39 - 4 - DrillQuest Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 133o7.1o 13336.o7 13369.o8 13399.82 13428.55 13463.20 13494.05 13523.55 13555.49 13584.13 13610.03 13646.67 13677.98 13703.97 13735.92 13796.14 13890.99 13920.88 13963.12 13993.87 14022.42 14055.39 14081.48 14112.03 142o6.14 88.460 85.080 81.76o 80.900 80.520 80.200 79.960 8o.91o 80.890 80.550 80.260 81.94o 82.500 82.850 82.950 82.76o 83.600 83.31o 82.870 84.390 88.460 94.560 96.690 97.060 94.590 Azim. 280.830 281.o5o 280.350 280.470 280.880 282.320 282.670 281.9oo 279.890 278.81o 279.18o 278.480 278.280 277.070 275.300 274.940 275.670 276.220 275.31o 273.950 272.280 271.o6o 271.25o 271.55o 271.99o Sub-Sea Depth (ft) 8843.77 8845.40 8849.18 8853.81 8858.45 8864.26 8869.57 8874.47 8879.52 8884.14 8888.46 8894.13 8898.37 8901.68 8905.63 8913.12 8924.38 8927.79 8932.87 8936.28 8938.06 8937.20 8934.64 8930.98 8921.43 Vertical Depth (ft) 8921.27 8922.90 8926.68 8931.31 8935.95 8941.76 8947.07 8951.97 8957.02 8961.64 8965.96 8971.63 8975.87 8979.18 8983.13 8990.62 9001.88 9005.29 9010.37 9013.78 9015.56 9014.70 9012.14 9008.48 8998.93 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 4709.36 N 4583.92W 5965438.38 N 626899.32 E 4714.85 N 4612.32W 5965443.37 N 626870.83 E 4720.94 N 4644.54W 5965448.89 N 626838.52 E 4726.43 N 4674.42W 5965453.86 N 626808.54 E 4731.68 N 4702.29W 5965458.62 N 626780.59 E 4738.55 N 4735.75W 5965464.90 N 626747.01 E 4745.13 N 4765.42W 5965470.96 N 626717.23 E 4751.31 N 4793.84W 5965476.65 N 626688.70 E 4757.28 N 4824.81W 5965482.07 N 626657.63 E 4761.87 N 4852.70W 5965486.17 N 626629.67 E 4765.86 N 4877.92W 5965489.72 N 626604.38 E 4771.42 N 4913.69W 5965494.65 N 626568.52 E 4775.94 N 4944.38W 5965498.63 N 626537.75 E 4779.38 N 4969.93W 5965501.63 N 626512.15 E 4782.80 N 5001.44W 5965504.49 N 626480.58 E 4788.13 N 5060.96W 5965508.78 N 626420.98 E 4796.84 N 5154.73W 5965515.84 N 626327.07 E 4799.91 N 5184.27W 5965518.40 N 626297.48 E 4804.12 N 5225.99W 5965521.88 N 626255.69 E 4806.59 N 5256.45W 5965523.82 N 626225.20 E 4808.14 N 5284.89W 5965524.86 N 626196.73 E 4809.10 N 5317.82W 5965525.25 N 626163.79 E 4809.62 N 5343.78W 5965525.32 N 626137.83 E 4810.36 N 5374.10W 5965525.53 N 626107.50 E 4813.25 N 5467.67W 5965526.78 N 626013.89 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Vertical Rate Section (°/100fi) (fi) Comment 12.930 6305.10 11.692 6332.53 10.276 6363.59 2.824 6392.33 1.932 6419.18 4.200 6451.71 1.362 6480.78 4.123 6508.59 6.214 6538.49 3.906 6565.05 1.799 6588.98 4.958 6622.88 1.897 6651.83 4.810 6675.78 5.506 6704.92 0.672 6759.39 1.170 6845.37 2.070 6872.61 2.379 6911.03 6.615 6938.78 15.404 6964.33 18.867 6993.49 8.196 7016.36 1.555 7043.14 2.665 7126.09 Continued... 3 March, 1999 - 10:39 - 5 - DrillQuest Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 14302.43 14394.17 14490.43 14584.o4 14677.85 14711.09 14740.43 14771.72 14861.36 14897.63 14928.1o 14954.03 15o45.31 15139.26 15231.60 15329.58 15412.27 15442.95 15477.24 15508.35 15628.00 94.990 95.210 95,610 95.110 94.930 90.520 87.69O 87.170 87.010 87.350 87.480 87.410 87.570 83.740 83.650 83.620 83.860 85.100 85,200 85,420 85.420 Azim. 272.820 273.18o 274.150 278.030 279.490 281.510 281.730 281.77o 283.370 285.030 287,190 287.200 288,290 291.46o 292.720 293.700 294,370 293.020 292,870 291.3o0 291.3oo Sub-Sea Depth (ft) 8913.39 8905.23 8896.16 8887.41 8879.2O 8877.62 8878.08 8879.48 8884.03 8885.82 8887.19 8888.35 8892.35 8899.47 8909.61 8920.47 8929.49 8932.44 8935.34 8937.88 8947.43 Vertical Depth (ft) 8990.89 8982.73 8973.66 8964.91 8956.7O 8955.12 8955.58 8956.98 8961.53 8963.32 8964.69 8965.85 8969.85 8976.97 8987.11 8997.97 9006.99 9009.94 9012.84 9015.38 9024.93 Local Coordinates Global Coordinates Northings Eastings Northings Eastlngs (ft) (ft) (ft) (ft) 4817.28 N 5563.54W 5965529.13 N 625917.96 E 4822.06 N 5654.79W 5965532.31 N 625826.64 E 4828.19 N 5750.43W 5965536.76 N 625730.92 E 4838.08 N 5843.08W 5965545.02 N 625638.10 E 4852.31N 5935.44W 5965557.64 N 625545.51E 4858.36 N 5968.08W 5965563.11N 625512.77 E 4864.27 N 5996.81W 5965568.52 N 625483.94 E 4870.63 N 6027.41W 5965574.35 N 625453.23 E 4890.11 N 6114.79W 5965592.30 N 625365.53 E 4899.00 N 6149.90W 5965600.57 N 625330.26 E 4907.45 N 6179.15W 5965608.50 N 625300.87 E 4915.10 N 6203.89W 5965615.72 N 625276.00 E 4942.90 N 6290.75W 5965641.99 N 625188.67 E 4974.73 N 6378.82W 5965672.28 N 625100.05 E 5009.24 N 6463.86W 5965705.30 N 625014.42 E 5047.62 N 6553.36W 5965742.10 N 624924.27 E 5081.10 N 6628.43W 5965774.26 N 624848.62 E 5093.37 N 6656.39W 5965786.04 N 624820.45 E 5106.69 N 6687.85W 5965798.80 N 624788.76 E 5118.35 N 6716.58W 5965809.96 N 624759.83 E 5161.67 N 6827.70W 5965851.33 N 624647.97 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Rate (°/lOOft) Vertical Section (ft) Comment 0.954 0,459 1.o86 4.161 1.562 14,589 9,675 1.667 1.792 4,666 7.095 0.273 1.2o6 5.285 1.36o 0,995 0.856 5.960 0,524 5.079 0.0oo 7211.6o 7293.45 7379.78 7465.37 7552.82 7584.23 7612.16 7641.95 7727.64 7762.60 7792.22 7817.54 7906.86 7999.22 8090.25 8187.o6 8268.90 8299.29 8333.24 8363.99 8482.07 PROJECTED SURVEY Continued... 3 March, 1999 - 10:39 - 6 - DrlllQuest Sperry-Sun Drilling Services Survey Report for U-O2APB1 Your Ref: API-500292117070 Job No. AKMW90047, Surveyed: 9 January, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad '~, All data is in feet unless otherwise stated. Directions and coordinates are relative to True' North. !:, );. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.630° (01-Feb-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 299.390° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15628.00ft., The Bottom Hole Displacement is 8559.23ft., in the Direction of 307.089° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 9791.54 8726.18 2403.83 N 2663.80 W TIE-ON POINT 9879.00 8803.51 2432.90 N 2692.50 W WINDOW POINT 15628.00 9024.93 5161.67 N 6827.70 W PROJECTED SURVEY 3 March, 1999 - 10:39 - 7- DrillQuest BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 September 9, 1999 Mr. Robert Christenson Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Re: Request to Commingle Test Production from S;200:~nd W-200 Wells Dear Chairman Christenson: As you are aware, BP as PBU WOA Operator on behalf of the lease owners, has drilled two Schrader test wells in the PBU WOA and requested approval of a Pilot Production Plan. S-200 (aka SB-01) bottomed on T12N-R12E UM Sec. 27 within ARCO/Exxon lease ADL 28258. W- 200 (aka SB-02) bottomed on Sec. T11N-R12E Sec. 21 within Mobil/Phillips/Chevron lease ADL 28263. Both wells have been briefly tested from various Schrader Bluff formation intervals, but additional appraisal completion or testing work remains to be performed before the pilot period. Both wells will be completed in the Schrader Bluff formation, no approval is requested for downhole commingling with formations other than the Schrader Bluff. The wellwork is expected to be performed in September and October 1999. Production testing is not expected to exceed seven days per well. Consistent with existing practices, BP requests approval by the AOGCC on behalf of ARCO/Exxon and Mobil/Phillips/Chevron to commingle production with other pools for processing at PBU Gathering Center 2 during the testing period. Production allocation will be based on the existing well test methodology approved by the AOGCC, based on well tests conducted at S and W pads. Similar approval was granted by letter of 12/18/97. BPX will undertake to advise the Division of the status of well operations in a timely manner. If you have any questions, please contact Steve Deckert at (907) 564-4128. Sincerely, Central North Slope- Western Developments CC: K. Boyd - Department of Natural Resources M. Evans - Exxon Company, U.S.A. W. Fennell- Chevron U.S.A., Inc. J. Hollier- Mobil Exploration & Production U.S., Inc. J. Johnson - Phillips Petroleum Company J. Pilkington - Department of Revenue G. Pospisil - ARCQ Alaska, Inc. 0 F! I L_I_I IMr= SEFtL/I C: E S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs U-02A & U-02A PB 1 September 9, 1999 AK-MW-90047 U-02A: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-029-21170-01 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-21170-01 U.-02A PB1: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-029-21170-70 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-21170-70 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMYI~AL LETFER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska:._.` 9?.518 Date: BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company WELL LOG-TRANSMITT~ To: State of Alaska August 31, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs U-02A & U-02A PB 1 AK-MW-90047 2 LDWG formatted Disks with verification listing. APl#: 50-029-21170-01 & 50-029-21170-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITFAL LEITER TO THE ATFENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 . BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date: 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company d rv ces rilling To: Mr. Blair Wondzell, AOGCC From: Jim Smith, SSD Date: $anuary 12, 1999 Subject: "Gunk" Squeeze for Lost Returns Well U-02A from rig Nabors 9ES is presently horizontal at 15,568'MD in the Ivishak formation, drilling has been halted due to excessive loss of returns to an expected fault which was crossed. At the current time, concentrated pills of LCM has not proved effective in halting losses. SSD plans to pump one or two more pills of highly concentrated LCM in efforts to stop the loss of seawater which is our fluid presently in the hole. Subsequent to these pills we propose to pump a "Gunk" squeeze composed of mineral oil and 300-400 #Pobl of bemonite gel. When the gel mixes with available water a reD' thick product is generated which has proved able to seal loss zones in the past, SSD has available a stockpile of the Conoco LVT-200 mineral oil which was previously used as drilling mud on the 13-02B well last year in efforts to control running Kingak shales. As opposed to purchasing new mineral oil we plan to use part of this existing stock of mineral oil in the "gunk" squeeze which is planned. Your acceptance of this proposal is requested. Regards, SSD SDE MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Bob Christenson,I~ DATE: January 31, 1999 Chairman THRU: Blair Wondzell, d'~~ FILE NO: AISJA5GF. DOC P. I. Supervisor ~/3 Iq'~ Lou Grimaldi,~o.~ Petroleum InslSector FROM: SUBJECT: BOP Test, Nabors #9ES BPX U-02 Prudhoe Bay Unit 98-0239 Non-Confidential Sunday, January 31, 1999; I witnessed a weekly BOP test on Nabors rig #9ES drilling BPX well #U-02 in the Prudhoe Bay field. The rig was ready to test within a hour of when I arrived. The stack was filled with the only available water on board, which was quite hot. This was in anticipation of building mud for the new section of hole to be drilled. I questioned the use of such warm fluid for testing, as this was the only water available at the time I allowed for the test to begin. The warm fluid gave us much problems by contracting as it cooled in the stack showing a pressure decline during each separate test. I requested that we change fluid, the only other suitable fluid was the mud in the trip tank. Normally, mud is not used due its compressibility and possible sealing of slight leaks, in light of this rigs short but good record I allowed for the mud to be used but held the tests slightly longer than I normally would. I mentioned to Lee Martin (Toolpusher) that in the future it would be required to have water at ambient temperature for test fluid. The test was restarted and all BOPE functioned properly and held its respective pressure tests. With the exception of the warm fluid problem, the test proceeded smoothly and showed this rig to be in good shape for finishing this well. SUMMARY: I witnessed the weekly BOP test on Nabors 9ES, No failures observed. Attachments: AISJA5GF.XLS cc; Bill Issacson (ODE Shared Services drilling) NON-CONFIDENTIAL Nabors 9ES '~ .... STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Nabors Operator: BPX Well Name: U-02A Casing Size: Test: Initial Workover: DATE: Rig No. 9 PTD # 98-239 Rig Ph.# Rep.: Kirk White Set ~ Weekly X Other 11/8/98 659-4103 Rig Rep.: Lee Martin/Jim Gaffney Location: Sec. 18 T. 11N R. 13E Umiat: TEST DATA MISC. INSPECTIONS: Location Gen.: P Housekeeping: P (Gen) PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec. P BOP STACK: Quan. Annular Preventer 1 Pipe Rams 1 Lower Pipe Rams 1 Blind Rams 1 Choke Ln. Valves HCR Valves 2 Kill Line Valves 1 Check Valve Test Press. P/F 250/2500 P 250/5,000 FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Ouan. Pressure I 250/5,000 1 1 I Functioned P/F P P P P Test CHOKE MANIFOLD: Pressure No. Valves 14 250/5,000 No. Flanges 32 Manual Chokes .__~1 IFunct oned I Hydraulic Chokes 1 P/F P P ACCUMULATOR SYSTEM: System Pressure 2,900 I Pressure After Closure 1,750 I MUD SYSTEM: Visual Alarm 200 psi Attained After Closure mln'S 30 sec. Trip Tank P P System Pressure Attained 2 rain's 2o sec. Pit Level Indicators P I~ Blind Switch Covers: Master: P Remo---'0"t~ P Flow Indicator I~ P Nitgn. Btl's: Four Bottles at 2200 ~ Meth Gas Detector P P H2S Gas Detector P P TEST RESULTS Number of Failures: ,Test Time: 3.0 Hours. Numl3er of valves test 20 Repair or replacement of Failed Equipment will be made within N/A days. Notify the Inspector and follow with Written or Faxed verification to the A0OCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good test, Check and log N2 precharge in accumulator bottles after pad moves and monthly. Distribution: STATE WITNESS REQUIRED7 odg-Well File YES X NO c - Oper./Rig 24 HOUR c - Database NOTICE GIVEN c - Trip Rpt File YES X NO c- Inspector Waived By: Witnessed By: Lou Grimaldi Page 1 BP EXPLORATION BASED ON ENGINEERING DATA ENGINEER BUDGET/AFE NO. SHEET NO. / OF ~ DEPT. APP'VL DATE. FILE NO. AK 2337-'~ (3/g4) BP EXPLORATION To: From; Subject: Blair Wondzell AOGCC Bob Kaluza, ODE, SSD MB 8-1 U-02A, Possible Second Sidetrack Date: January 20, 1999 U-02A was planned as a 7,000' extended horizontal undulating sidetrack, drilling to two (2) Zone 4 targets. The well was kicked out of 7 "casing at _ 9,900' MD in the Sag River formation and directionally drilled through Z4 Target #1 at _+ 11,800' MD. Four (4) faults were crossed through Target #1 without any hole problems. The well was then turned 60° WNW and directionally drilled through Z4 Target #2 crossing four (4) additional non-troublesome faults. At ± 15,568' MD massive loss circulation occurred when fault ,f9 was encountered; static fluid losses to the fault were as high as 200 bbl/hr (the rig switched from FIo-Pro mud to filling the hole with 8.4 ppg seawater). Three large MI Kwikseal/Coarse Nut Plug LCM pills were pumped into the fault where static losses decreased to 4 - 5 bbl/hr. Fault #9 was then drilled across to 15,628' MD where static loss circulation dramatically increased to as high as 400 bbl/hr. When drilling the fault, the Nabors 9ES driller described that he drilled through a void for about 5 feet. Three more coarse mix, 120 ppb/100bbl Kwlkseal/NutPlug pills were mixed and pumped to slow the loss circulation. Static losses again slowed to < 20 bbl/hr to the fault. The fault was then penetrated a second time and massive loss circulation occurred again; as high as 400 bbl/hr. The BHA was changed to allow for larger and more diverse LCM pills to be pumped. One 50 bbl Iow compressive strength cement pill and two (2) more high density Kwikseal/Nutplug pills were pumped to the fault with no positive effect. The fault took every type of LCM pill and continued to take seawater from the wellbore at 100 - 200 bbl/hr static. Because the fault could not be effectively sealed, hole cleaning while circulating the drill string was very ineffective. Full circulation and good hole cleaning could not be achieved after fault ~9 was penetrated. The wellbore was not completely clean of drilling cuttings and had LCM material throughout. After the cement LCM pill and final two (2) high density Kwikseal/Nutplug was pumped, the drill string was pulled out of the hole. At + 14,000' MD the hole started to get sticky and acted as if the hole was packing off. Circulation could no longer be achieved (due to losses to the fault and due to packing off) but the drill string could be rotated and could still be pulled out of the hole. At 12, 745' MD the drill stdng could no longer be pulled out of the hole and became stuck. The drill pipe was backed off at _+ 10,900' and a jarring assembly RIH. The 1,845' fish was jarred up hole 60' but could not be completely recovered. Fishing operations continue today. I} the fish is not recovered soon, the fishing assembly will be backed off, a cement plug will have to be set on top of the fish and a new Z4 wellbore will have to be ddlled. Drilling will stop prior to encountering fault #9 with the next directional plan. In the event that a second sidetrack wellbore will be needed to complete this well, a complete Sundry Permit · will be submitted. Prepared by: Drilling EnginEer ~ Date CC: Tony Bunch Dan Stone Jim Smith MB 8-1 MB8-1 MB 8-1 TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 November 25, 1998 James E. Smith Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 ac: Prudhoe Bay Unit U-02A ARCO Alaska, Inc,. Permit No: 98-239 Sur Loc: 237'NSL, 2434'WEL, Sec. 18, T1 iN, R13E, UM Btmhole Loc. 4990'NSL, 4367'WEL, Sec. 13, T11N, R12E, UM Dear Mr. Smith: Enclosed is the approved revised application for permit to drill the above referenced well. The revision is fora change in bottom-hole location. The provisions of the original approved permit dated November 25, 1998, are in effect for this revision. ~ Commissioner BY ORDER OF THE COMMISSION dlffEnclosurcs CC: Department of Fish & Game, Habitat Section W/o encl Department of Environmental Conservation w/o encl STATE OF ALASKA ALASKA'~IL AND GAS CONSERVATION COk.~.,llSSlON PERMIT TO DRILL 20 AAC 25.005 Revised: 01/25/99 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 77.5' Prudhoe Bay Field / Prudhoe 3. Address 16. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047451 :4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 237' NSL, 2434' WEL, SEC. 18, T11 N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 3096' NSL, 306' WEL, SEC. 13, T11N, R12E, UM U-02A At total depth 9. Approximate spud date Amount $200,000.00 4990' NSL, 4367' WEL, SEC. 13, T11N, R12E, UM 01/24/99 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028260, 290'I No Close Approach 2560 15213' MD /8925' TVDss 16. To be completed for deviated wells 17. Anticipated pressure [see 20 AAC 25.035 (e) (2)} Kick Off Depth 10390' MD Maximum Hole Angle 100° Maximum surface 2470 psig, At total depth tTVD) 8800'/3350 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT-M 5473' 9740' 8599' 15213' 8925' 803 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: truemeasuredvertical 103479210 feetfeet Plugs(measured) 0 ~, I G i I,~ kL Effective depth' measured 10182 feet Junk (measured) Fill at 10182' true vertical 9069 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds concrete 145' 145' Surface 2645' 13-3/8" 3255 cu ft PF 'E', 465 cu ft PF II 2680' 2680' Intermediate 9836' 9-5/8" 2380 cu ft Class 'G' 9871' 8804' Production Liner 741' 7" 270 cuff Class 'G'~.~~¢~E~ ~'I 9~6~6'.-~r6~ ~.~.-~t0345' 8578' - 9210' Scab Liner 6639' 7" 1028 cu ft Class 'G' ~\. ..... 604' 2965' - 8578' Perforation depth: measured None dAN 2b ~999 true vertical None ,¢daska 0il & Gas Cons. O0mfflissi0r, Anch0ra.~a 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid___/.,.~Pr~Ep~ []/Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements /' ,/// / 21. I hereby certify that the/oregoj~ is trj~ an~c~eCto the best of my knowledge . / Signed //(~ ,/¢'. ~/-~-~' ///./'_ ' / -/ m~t ~ / ~' '~' / ~ James E.S'h ~' ~'"~~-:'.._~/'~(//~"~ Title Senior Drilling Engineer Date ///~ // ¢ ~" * - .... ' ~h Commission Use Only / Permit Number J APINumber //Appr°val Date____ ~ I See cover letter q~.~..~'~ 50-029-21170 --o / --- ¢,1¢~- 'r~ for other requirements Conditions of Approval: Samples Required []Yes/'~]No Mud Log Required []Yes [~No Hydrogen Sulfide Measures .J~Yes [] No Directional Survey Re..q.uired [~Yes [] No Required Working Pressure for BOPE []2K; 1--13K; 1--14K; ~ []10K; I--I15K Other: Original Si~ncd By " by order of Approved ay David W. Johnston Commissioner the commission Date//--,,~-. ¢~ Form 10-401 Rev. 12-01-85 Submit In Triplicate l Well Name: I u-02A Well Plan Summary l Type of Well (producer or injector): I Producer ] Surface Location: 237' FSL, 2434' FEL, Sec. 18, TllN, R13E Kick Off Point: Target #1: Geological Target #2: Geological Target #3: Geological Target #4: Geological Target #5 End: X = 631,565 Y= 5,960,810 3096' FSL, 306' FEL, Sec. 13, T1 iN, R12E X = 628,695 Y = 5,963,620 Z = 8901' TVDss 4165' FSL, 1168' FEL, Sec. 13, TllN, R12E X = 627,815 Y = 5,964,675 Z = 8,845' TVDss 4614' FSL, 1995' FEL, Sec. 13, T1 IN, R12E X = 626,980 Y = 5,965,110 Z = 8,938' TVDss 4862' FSL, 2435' FEL, Sec. 13, T1 iN, R12E X = 626,536 Y = 5,965,350 Z = 8,870' TVDss 4859' FSL, 3451' FEL, Sec. 13, T1 IN, R12E X = 625,520 Y = 5,965,330 Z = 8,956' TVDss 4990' FSL, 4367' FEL, Sec. 13, T1 IN, R12E X = 624,602 Y = 5,965,446 Z = 8,925' TVDss I AFE Number: 14P1078 I Rig: I Nabors 9ES Operating days to complete: I TVOss: 18,925' I IEstimated Start Date: I 1/24/99 IUD 115,213' I 17 I KBE: 177.5' IWell Design (conventional, slim hole, etc.): Extended Horizontal Sidetrack Objective: Kick off cement plug in ZA at 10,390', directionally drill 6" hole thru (1) Z4 target, TD at 15,213' MD. Run, cmt and test 4 1/2" solid liner, complete with 4 ~/-'' y2 , L-80 tbg, (6) GLM's and WOA tail assy. Formation Markers Formation Tops MD TVD(ss) Original wellbore 9,890' 8,731' Sidetrack from Whipstock out of 7 "liner sidetrack into Sag River formation. TShublik 9,906' 8,745' TSAD 10,046' 8,841' TZ4 10,046' 8,841' Target Start; KOP 10,390' 8,881' KO cement plug after Geologic Plugback TD - Target 15,213' 8,925' Undulating thru Z4 target HO/T 8,984' OOWC 9,004' Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MDfYVD MDfrVD O.D. 6" 4 1/2" 12.6# L-80 IBT 5,473' 9,740'/8,599' 15,213'/8,925' liner Mod 4 V2" 12.6# L-80 IBT 9,710' 30'/30' 9,740'/8,599' compl. Mod Logging Program: Open Hole Logs: [Cased Hole Logs Drilling section: MWD/GR from KOP (10,390') bit exhaustion. MWD/GR/Res to TD at 15,213' MD. MADD pass as per Geologist request. DPC Platform Express + Sonic will be run after reaching TD. Sample catchers and rig site geologist on site before drill out of window. None Mud Program: Special design considerations IAll of Z4 to TD with MI Flo-Pro Polymer system. The formulation of the brine phase will be 6% KCL. Density LS R V P V Gels Chlo ri des p H (ppg) (cps) 8.7 55 ~ 60,000 < 15 10 sec. >18 30,000 9.0-9.5 to to expect to to 8.9 55 - 60,000 8-12 10 min. >20 30,000 9.0-9.5 Record LSRV at 1,2,3 minutes: Make certain they are elevated and fiat. Plan to run 3-5 % Lubetex by volume. Start 6", Z4 section at 3 % Sweeps, Liner slugs and CBU sweeps at 150,000 cp w/60-80 rpm & reciprocation the full 90'. Ensure good stocks of LCM on location. Directional: KOP: 1) 10,390' MD, kick offcmt plug, steer to 319° azimuth and 85° inclination, TD (15,213') well at 278° azimuth and 92° inclination. Will make three small azimuth tums to TD and will drill (2) undulations thru ZA to TD. Maximum Hole Angle: Surface Shut-in Close Approach Well: Point to point separation 100° undulating thru Z4 None, due to Geologic Plugback and Kickoff. There are no close approach wells to this new wellbore identified by Sperry Sun. Cement Data: Casing/Liner Lead: Tail: Sxs/Wt~ield Comments Sxs/Wt/Yield P&A of original well 127/15.8/1.15 Class "G", TOC 9,750' 432' + 10 bbl 135' above top perfs. 4 V2", 12.6#, L-80 liner 603/15.8/1.15 Class "G", 50% excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter and BOPE system schematics on file with AOGCC. Bottom hole pressure is 3,350 psi at 8,800 TVDss through targe. Maximum shut-in casing pressure is 2,470 psi (assumes 0.1 psi/ft gas gradient to surface). NO ANNULAR INJECTION IN THIS WELL. U-02A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Contacts Name Office Home Pager Bob Kaluza Drilling Eng. 564-5344 563 9059 275-1014 Tony Bunch Drilling Supt. 564-5219 229-0729 275-3703 Bob Metzger Geologist 564 4613 345 2592 223 7187 Daniel Hsi Pad Engr. 564 4513 345 5982 227 0439 Bruce Smith Asset Drilling Eng. 564 5173 345 2948 275 4600 Stuart Montaque Geophysicist 564 4029 561 9500 230 6335 Drilling Discussion Well Objective The NW fault block of the U - Pad has 129 million reservoir bbls total pore volume, of which approximately 107 million (83%) will be under flood. U-02A is a critical well for flood and MI development, and will be a 5,300' undulating Z4B producer receiving support from three injectors. This well will capture the reserves associated with current producers U-12 (presently P&A'd for sidetrack) and U-02, as well as the undrained region in the western most part of the U pad. The unrisked incremental reserves are 6.02 mmstb. The expected average first year incremental oil rate is 2645 bopd at 60% WCUT and 699 scf/stb GOR. Drilling Objective Original Wellbore The drilling objective was to pull the existing 4 ½" x 3 ½" tubing, mill up and retrieve the existing production packer, dress the P & A cement plug to just below the Sag River perforations, set a whipstock and mill through 7' liner casing into the Sag River formation. Directionally drill this 7,000' undulating extended horizontal sidetrack through two Z4B targets to TD at 16,863'. Run, cement and test 4 ½" liner, perforate and complete with 4 ½" tubing. After the decompletion phase was successfully completed, the well was kicked off into the Sag River formation, successfully steered into and through the first Z4 target and into Z4 target 4/2. Eight faults were drilled without incident. At 15,568' MD, fault gO was encountered where massive lost circulation losses were incurred ( as high as 400 bbl/hr). Eleven (11) LCM pills of various sizes and properties were pumped to the fault to seal off the fault. None worked effectively. Because the fault took so much fluid, full circulation and good hole cleaning could never be achieved. After LCM pill 4/ 11 was pumped the drill string was POOH. At 12,745' MD, the DP became stuck and had to be severed (top of fish 11,014'). A cement plug was set and dressed down to 10,390' where a second EHST (extended horizontal sidetrack) will be drilled out of the original wellbore. Drilling Objective Sidetrack Wellbore The new Z4 wellbore will be drilled from KOP at 10,390' to TD at 15,312' MD. The well will have two undulations (@ 1,300' in length each) through one Z4 target. No large faults are predicted but (10) small faults will occur with the potential for fluid loss. Several small faults (10'-35') have been interpreted, but poor data quality precludes correlation of these faults laterally for any significant mapable extent. The designed well path optimizes structural position and reservoir exposure with undulations that will be geosteered using MWD/GR/Res (real time). The criteria for geosteering are approximately 20' standoff from the HOT and ensuring the wavelength of the undulation is targeted at 1400 feet or less. The well will be completed as a Zone 4B producer with a 4 ½", L-80, 12.64/tubing, (6) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NU/ND. SURFACE CLOSE APPROACH WELL SHUT-INS There is no well that will need to be shut-in during the rig move on and off of the well. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROACH WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plan due to close approach requirements. PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.4 ppg EMW and the Sadlerochit is expected to be near 7.4 ppg. 8.7 - 8.8 ppg mud will be used drilling the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the reservoir pressure. HOLE PROBLEMS The well's design cuts 10 small faults in the reservoir section, however only (1) of the faults are large enough and areally extensive to be mapped. Be prepared for the possibility of lost circulation. The original wellbore, U-02, did not experience lost circulation. Other wells in the intermediate vicinity have experienced minor lost circulation. The original wellbore, U-02A, experienced massive loss circulation to fault 4/9. No major conductive faults have been identified and no major hole problems are expected. H~S: U-Pad is not an H2S Pad There are no reported incidents of H2S at well U-02. H2S precautions will be in effect at all times. These include (but are not limited to): · Regular H2S drills (minimum of two per week) · Proper training of all permanent onsite personnel, unescorted visitors and temporary onsite personnel; · H2S monitors with both audible and visual alarms; · Access to 5-minute emergency escape air packs; · Personal H2S monitors; · Functional wind indicator; · Posted evacuation routes (minimum of two); · Muster points in designated safe areas;I-Ig.S; -- · Functional communications between rig camp and rig floor. Fault Evaluation See Hole Problems. The original wellbore, U-02A, experienced massive lost circulation. Other wells in the immediate vicinity have experienced lost circulation: U-03, U-11, U-13, U-14, H- 10, H-12, and H-32. Casing Shoe Kick Tolerance The smallest kick tolerance for the 9 5/8" casing shoe is calculated as infinite of influx assuming a swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg MW (TSAG 9,883' MD & 8,725' TVDss, 7.8 ppg reservoir pore pressure), and min. frac at shoe of 12.0 ppg. SUMMARY PROCEDURE Rig Sidetrack Procedure 1. Set 17 ppg cement plug on top of severed fish (top at 11,014'), dress down to 10,390' 2. Kick-off and directionally drill 6" hole to 15,312' TD. 3. Run DPC log suite at TD. 4. Run and cement 4 V2", L-80 solid production liner (cement behind the entire liner). 5. Perforate DPC 6. Run 4 V2", L-80 tubing completion. 7. ND BOPE, NU and test tree. RDMO. TREE: 4" CIW - 5M - McEvoy WELLHEAD: 13 5/8" - 5M - McEvoy ACTUATOR: OTIS ) U -O2A 133/8" 72# L-80 BTR8 26801 7" TIW 8-6 Top Packer 2,9651 41/2", 12.6#/ft, L-80 TUBING ID: 3.958" CAPACITY: 0.0152 BBUFT 7",26# , L-80, TC48 8cab Liner 7" BAKER TIEBACK RECEPTACLE 916061 9 5/8" 47# L-80 BTR8 I 9,8681 Window 9,9001 Whipstock @ 9,915' MD PERFORATION SUMMARY REF LOG: SWS - BHCS11-14-86 SIZE SPF INTERVAL OPEN/SOZ'D FISH: 2" x 7" Bullnose from Perf Gun I I I 10,1821 10,3031 10,3451 I I ] . ') KB. ELEV = 77.46 BF. ELEV = 30.00 SSSV LANDING NIPPLE (OTIS) (3.813" ID) 20821 GAS LIFT MANDRELS CAMCO w/ RK ATCH) NS! MD(BKB) TVDss 1 2 3 4 5 6 4-1/2" X Nipple @ 9,680' MD 7" Production Packer @ 9,690' MD 4-1/2" X Nipple @ 9,724' MD 4-1/2" XN Nipple @ 9,735' MD 4-1/2" Liner Top @ 9,740' MD . . Geologic Plugback of Sidetrack #1. KOP: 10,390' Sidetrack #2 MAX ANGLE: 1000 @ 12,900' MD 4-1/2" 12.6# L-80 1ST-mod Liner TD @ 15,213' MD PBTD @ 15,133' MD All Perforations Plugged durino Pre-Rio work PBTD ~~ 7", 29# L-80 IJ4S DATE - 9-8-84 COMMENTS INITIAL COMPLETION REV. BY 8-22-90 POST 1990 WORKOVER LGM 4-9-92 9-3-94 A.TEEL J. Attid Tubing Patch over GLM #6 REVISED BP PRUDHOE BAY UNIT WELL: U-02A 42-13-11-12 API NO: 50-029-21170 SEC 18: TN 11N: RGE 13E Exploration (Alaska) SHARED SERVICES DRILLING WELL ' U-02A Wp6 I DrillQues. t' Proposal Data for U-02A Wp6 Vertical Origin: Well Horizontal Origin: Well Measurement Units: tt North Reference: True North Dogleg severity- Degrees per 100it Vertical Section ~zimuth: 299.390° Vertical Section Description:Well Vertical Section Origin: 0.00 N,0.00 E Measured IncJ. Azirm Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 10400.00 85.248 352.658 8977.94 2859.94 N 2820.66 W 3861.16 10440.00 82.685 349.570 8982.15 2899.23 N 2826.80 W 3885.79 10.000 I0757.20 94.853 318.500 8989.12 3180.26 N 2963.87 W 4143.14 10.500 11559.76 94.853 318.500 8921.23 3779.19 N 3493.76 W 4898.76 0.000 11802.28 85.000 299.000 8921.54 3930.07 N 3681.75 W 5136.60 9.000 11817.85 83.723 298.419 8923.07 3937.52 N 3695.35 W 5152.10 9.000 12633.41 83.723 298.419 9012.25 4323.33 N 4408.32 W 5962.65 0.000 12748.95 94.000 300.000 9014.54 4379.62 N 4509.01 W 6078.00 9.000 12812.02 99.525 301.314 9007.12 4411.54 N 4562.86 W 6140.59 9.000 13095.71 99.525 301.314 8960.17 4556.95 N 4801.89 W 6420.21 0.000 13259.58 90.000 290.000 8946.54 4627.36 N 4948.74 W 6582.72 9.000 13540.40 83.670 265.481 8962.28 4665.00 N 5224.28 W 6841.27 9.000 14118.77 83.670 265.481 9026.04 4619.71 N 5797.34 W 7318.35 0.000 14287.07 91.919 278.205 9032.54 4625.15 bi 5964.93 W 7467.04 9.000 15212.89 91.919 278.205 9001.54 4757.21 N 6880.76 W 8329.81 0.000 SURFACE LOCATION Horizontal Coordinates: 5960810.00 N, 631565.00 E RKB Elevation: 76.54 ff RKB- AMSL NAD27/Uaska State manes, Coordinate System: Zone 4. US Foot Sinqle Well Tarqet Data for U-02A RiqWps PLOT DATE' Created By: Checked By: ~ 22-Jan-9 Target Name ff Coordinate Point ' U-02A Wp6 Polygon Entt7 l~int Boundary Point A C D £ F G H I $ TVD-RKB U-02A Wp6 TI Entry Point 8921.54 8845.00 U-O2A Wp6 T'2 Entxy Point 9014.54 8938.00 U-O2A Wp6 T3 Entry Point 8946.54 .8870.00 U.4)2A Wp6 T4 Entry Point 9032.54 8956.00 U-O2A WD6 T5 Enu7 Point 9001.54 8925.00 TVD-SS Northings Eastings Northing$ 2266.82 N 2882.75 W 5963026.00 N 2266.82 N 2882.75 W 5963026.00 N 2253.59 N 2583.94 W 5963018.00 N 3138.01 N 2714.47 W 5963900.00 N 4008.27 N 3464.35 W 5964~57.00 N 4330.75 N 4002.78 W 5965070.00 N 4693'.54 N 5015.59 W 5965415.00 N 4934.92 N 6919.65 W 5965623.00 N 4551.71 N 6911.36 W 5965240.00 N 4496.76 N 5087.04 W 5965217.00 N 4060.64 N 4284.56 W 5964795.00 N 3559.30 N 3641.24 W 5964305.00 N 3930.07 N 3681.75 W 5964675.00 N 4379.62 N 4509.01 W 5965110.{30 N 4627.36 N 4948.74 W 5965350.00 N 4625. ! 5 N 5964.93 W 5965330.00 N 4757.21 N 6880.76 W 5965446.00 N Fastings Target Shape 628643.00 E Polygon 628643.00 E 628942.00 £ 628796.00 E ,' 62803 i .00 E ~, 627487.00 E 626468.00 E 624560.00 E 624575.00 E 626400.00 E 627210.00 £ 627862.00 E 627815.00 E Point 626980.00 E Point 626536.00 £ Point 625520.00 E Point 624602.00 E Point 8400 - 1::: :7- 910o - O U-O2A Wp6 TI U-O2A Wp6 T2 8946.54 TVD 8921.54 TVD 9014.54 TVD 4627.36 N, 4948.74 W 9032.54 TVD ' 9001.54 TVD 3930.07 N, 3681.75 W 4379.62 N, 4509.01 W 4625.15 N, 5964.93 W 4757.21 N, 6880.76 W 3500 4200 4900 5600 6300 7000 7700 8400 Scale: I inch = 700ft Vertical Section Section Azimuth: 299.390° (True North) Sperry-Sun Drilling Services Proposal Report for U-O2A RigWps - U-O2A Wp6 Revised: 22 January, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth Northings (ft) (ft) (ft) (ft) 10400.00 85.248 352.658 8901.40 8977.94 2859.94 N 10440.00 82.685 349.570 8905.61 8982.15 2899.23 N 10500.00 84.930 343.648 8912.08 8988.62 2957.23 N 10600.00 88.777 333.862 8917.58 8994.12 3050.16 N 10700.00 92.659 324.103 8916.33 8992.87 3135.73 N 10757.20 94.853 318.500 8912.58 8989.12 3180.26 N 10800.00 94.853 318.500 8908.96 8985.50 3212.20 N 10900.00 94.853 318.500 8900.50 8977.04 3286.83 N 11000.00 94.853 318.500 8892.04 8968.58 3361.45 N 11100.00 94.853 318.500 8883.58 8960.12 3436.08 N 11200.00 94.853 318.500 8875.12 8951.66 3510.71 N 11300.00 94.853 318.500 8866.66 8943.20 3585.33 N 11400.00 94.853 318.500 8858.20 8934.74 3659.96 N 11500.00 94.853 318.500 8849.74 8926.28 3734.59 N 11559.76 94.853 318.500 8844.69 8921.23 3779.19 N 11600.00 93.226 315.256 8841.85 8918.39 3808.48 N 11700.00 89.151 307.228 8839.77 8916.31 3874.32 N 11800.00 85.092 299.184 8844.80 8921.34 3928.97 N 11802.28 85.000 299.000 8845.00 8921.54 3930.07 N 11817.85 83.723 298.419 8846.53 8923.07 3937.52 N 11900.00 83.723 298.419 8855.51 8932.05 3976.38 N 12000.00 83.723 298.419 8866.45 8942.99 4023.68 N 12100.00 83.723 298.419 8877.38 8953.92 4070.99 N 12200.00 83.723 298.419 8888.32 8964.86 4118.30 N 12300.00 83.723 298.419 8899.25 8975.79 4165.60 N Local Coordinates Global Coordinates Dogleg Vertical Eastings Northings Eastings Rate Section (fi) (fi) (fi) (°/100fi) (fi) 2820.66 W 5963620.11 N 628694.70 E 3861.16 2826.80 W 5963659.29 N 628687.87 E 10.000 3885.79 2840.61 W 5963717.04 N 628673.04 E 10.500 3926.29 2876.76 W 5963809.32 N 628635.28 E 10.500 4003.39 2928.21 W 5963893.98 N 628582.34 E 10.500 4090.21 2963.87 W 5963937.88 N 628545.90 E 10.500 4143.14 2992.13 W 5963969.32 N 628517.08 E 0.000 4183.44 3058.16 W 5964042.78 N 628449.76 E 0.000 4277.59 3124.18 W 5964116.24 N 628382.44 E 0.000 4371.74 3190.21 W 5964189.69 N 628315.12 E 0.000 4465.89 3256.23 W 5964263.15 N 628247.80 E 0.000 4560.04 3322.26 W 5964336.61 N 628180.48 E 0.000 4654.19 3388.28 W 5964410.07 N 628113.15 E 0.000 4748.34 3454.31 W 5964483.53 N 628045.83 E 0.000 4842.49 3493.76 W 5964527.43 N 628005.60 E 0.000 4898.76 3521.20 W 5964556.24 N 627977.66 E 9.000 4937.03 3596.30 W 5964620.75 N 627901.42 E 9.000 5034.78 3679.77 W 5964673.93 N 627817.00 E 9.000 5134.33 3681.75 W 5964675.00 N 627815.00 E 9.000 . 5136.60 3695.35 W 5964682.21 N 627801.27 E 9.000 5152.10 3767.16 W 5964719.81 N 627728.79 E 0.000 5233.74 3854.58 W 5964765.57 N 627640.56 E 0.000 5333.13 3942.00 W 5964811.34 N 627552.32 E 0.000 5432.51 4029.43 W 5964857.11 N 627464.08 E 0.000 5531.90 4116.85 W 5964902.88 N 627375.85 E 0.000 5631.28 Alaska State Plane Zone 4 PBU_WOA U Pad Comment KOP: Start Dir @ 10°/100ft: 10400.00ft MD, 8977.94ft TVD Start Dir @ 10.500°/100ff: 10440.00ft MD, 8982.15ft TVD End Dir: 10757.20ft MD, 8989.12ft 'I'VD Start Dir @ 9.000°/100ff: 11559.76ft MD, 8921.23ft TVD Target - U-02A Wp6 T1, Geological End Dir: 11817.85ft MD, 8923.07ft TVD Continued... 22 January, 1999- 15:36 - 1 - DrillQuest Prudhoe Bay Unit Measured Sub-Sea Vedical Depth Incl. Azim. Depth Depth (~) (~) (~) 12400.00 83.723 298.419 8910.18 8986.72 12500.00 83.723 298.419 8921.12 8997.66 12600.00 83.723 298.419 8932.05 9008.59 12633.41 83.723 298.419 8935.71 9012.25 12700.00 89.646 299.331 8939.56 9016.10 12748.95 94.000 300.000 8938.00 9014.54 12800.00 98.472 301.061 8932.46 9009.00 12812.02 99.525 301.314 8930.58 9007.12 12900.00 99.525 301.314 8916.02 8992.56 13000.00 99.525 301.314 8899.47 8976.01 13095.71 99.525 301.314 8883.63 8960.17 13100.00 99.278 301.012 8882.93 8959~7 13200.00 93.482 294.080 8871.81 8948.35 13259.58 90.000 290.000 8870.00 8946.54 13300.00 89.061 286.486 8870.33 8946.87 13400.00 86.761 277.778 8873.98 8950.52 13500.00 84.536 269.032 8881.58 8958.12 13540.40 83.670 265.481 8885.74 8962.28 13600.00 83.670 265.481 8892.31 8968.85 13700.00 83.670 265.481 8903.33 8979.87 13800.00 83.670 265.481 8914.36 8990.90 13900.00 83.670 265.481 8925.38 9001.92 14000.00 83.670 265.481 8936.41 9012.95 14100.00 83.670 265.481 8947.43 9023.97 14118.77 83.670 265.481 8949.50 9026.04 Sperry-Sun Drilling Services Proposal Report for U-O2A RigWps - U-O2A Wp6 Revised: 22 January, 1999 Alaska State Plane Zone 4 PBU_WOA U Pad Local Coordinates Nothings (~) 4212.91N 4260.21N 4307.52 N 4323.33N 4355.42 N 4379.62 N 4405.39 N 4411.54 N 4456.64 N 4507.89 N 4556.95N 4559.14 N 4605.02 N 4627.36 N 4640.01N 4661.00 N 4666.92 N 4665.00N 4660.33N 4652.50 N 4644.67 N 4636.64N 4629.01N 4621.18 N 4619.71N Global Coordinates Dogleg Vedical Eastings Nothings Eastings Rate Section (~) (~) (~) (°/100~) (~) 4204.27W 5964948.65 N 627287.61E 0.000 5730.67 4291.69W 5964994.42 N 627199.37E 0.000 5830.06 4379.11W 5965040.18 N 627111.14 E 0.000 5929.44 4408.32W 5965055.48 N 627081.65 E 0.000 5962.65 4466.51W 5965086.54N 627022.92 E 9.000 6029.09 4509.01W 5965110.00 N 626980.00 E 9.000 6078.00 4552.71W 5965135.00 N 626935.85 E 9.000 6128.73 4562.86W 5965140.97 N 626925.59 E 9.000 6140.59 4636.99W 5965164.76 N 626850.68 E 0.000 6227.31 4721.25W 5965234.53N 626765.54 E 0.000 6325.88 4801.89W 5965282.17 N 626684.06 E 0.000 6420.21 4805.51W 5965264.30 N 626680.39 E 9.000 6424.45 4893.55W 5965328.63 N 626591.57 E 9.000 6523.67 4948.74W 5965350.00 N 626536.00 E 9.000 6582.72 4987.11W 5965361.98 N 626497.41 E 9.000 6622.36 5064.71W 5965381.25 N 626399.45E 9.000 6717.70 5184.14W 5965385.43N 626299.93 E 9.000 6807.24 5224.28W 5965382.81N 626259.64E 9.000 6841.27 5283.33W 5965377.11 N 626200.88 E 0.000 6890.43 5382.41W 5965367.54N 626101.95 E 0.000 6972.92 5481.49W 5965357.98 N 626003.02 E 0.000 7055.40 5580.57W 5965348.42 N 625904.09 E 0.000 7137.89 5679.66W 5965338.85 N 625805.16 E 0.000 7220.37 5778.74W 5965329.29 N 625706.23 E 0.000 7302.86 5797.34W 5965327.49 N 625687.66 E 0.000 7318.35 Comment Start Dir @ 9.000°/100ft: 12633.41ft MD, 9012.25ft TVD Target - U-02A Wp6 T2, Geological End Dir: 12812.02ft MD, 9007.12ft TVD Start Dir @ 9.000°/100ft: 13095.71ft MD, 8960.17ft 'I'VD Target - U-02A Wp6 T3, Geological End Dir: 13540.40ft MD, 8962.28ft TVD Start Dir @ 9.000°/100ft: 14118.77ft MD, 9026.04ft TVD Con#nued... 22 January, 1999- 15:36 -2- DrillQuest Sperry-Sun Drilling Services Proposal Report for U~O2A RigWps - U-O2A Wp6 Revised: 22 January, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (ft) (°ll00ff) (fi) Comment 14200.00 87.637 271.640 8955.66 9032.20 4617.69 N 5878.25W 14287.07 91.919 278.205 8956.00 9032.54 4625.15 N 5964.93W 14300.00 91.919 278.205 8955.57 9032.11 4627.00 N 5977.72W 14400.00 91.919 278.205 8952.22 9028.76 4641.26 N 6076.64W 14500.00 91.919 278.205 8948.87 9025.41 4655.52 N 6175.56W 14600.00 91.919 278.205 8945.52 9022.06 4669.79 N 6274.48W 14700.00 91.919 278.205 8942.17 9018.71 4684.05 N 6373.40W 14749.98 91.919 278.205 8940.50 9017.04 4691.18 N 6422.84W 14800.00 91.919 278.205 8938.83 9015.37 4698.32 N 6472.33W 14900.00 91.919 278.205 8935.48 9012.02 4712.58 N 6571.25W 15000.00 91.919 278.205 8932.13 9008.67 4726.84 N 6670.17W 15100.00 91.919 278.205 8928.78 9005.32 4741.11 N 6769.09W 15200.00 91.919 278.205 8925.43 9001.97 4755.37 N 6868.01W 15212.89 91.919 278.205 8925.00 9001.54 4757.21 N 6880.76W 5965324.05 N 625606.80 E 9.000 7387.85 5965330.00 N 625520.00 E 9.000 7467.04 5965331.62 N 625507.18 E 0.000 7479.09 5965344.15 N 625408.02 E 0.000 7572.28 5965356.68 N 625308.87 E 0.000 7665.47 5965369.21N 625209.71E 0.000 7758.66 5965381.74 N 625110.56 E 0.000 7851.85 5965388.00 N 625061.00 E 0.000 7898.43 5965394.27 N 625011.40 E 0.000 7945.04 5965406.80 N 624912.25 E 0.000 8038.23 5966419.33 N 624813.09 E 0.000 8131.42 5965431.86 N 624713.94 E 0.000 8224.61 5965444.39 N 624614.78 E 0.000 8317.80 5965446.00 N 624602.00 E 0.000 8329.81 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. End Dir: 14287.07ft MD 9032.54ft TVD Target - U-02A Wp6 T4,'Geological Sail @ 91.919° Inclination on 278.205° Azimuth Total Depth: 15212.89ft MD 9001 54ft TVD 4 1/2' Liher ' ' Target - U-02A Wp6 T5, Geological The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 299.390° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15212.89ft., The Bottom Hole Displacement is 8365.16ft., in the Direction of 304.659° (True). Continued... 22 January, 1999 - 15:36 - 3- DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Proposal Report for U-O2A RigWps - U-O2A .Wp6 Revised: 22 January, 1999 Alaska State Plane Zone 4 PBU_WOA U Pad Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 10400.00 8977.94 2859.94 N 2820.66 W 10440.00 8982.15 2899.23 N 2826.80 W 10757.20 8989.12 3180.26 N 2963.87 W 11559.76 8921.23 3779.19 N 3493.76 W 11817.85 8923.07 3937.52 N 3695.35 W 12633.41 9012.25 4323.33 N 4408.32 W 12812.02 9007.12 4411.54 N 4562.86 W 13095.71 8960.17 4556.95 N 4801.89 W 13540.40 8962.28 4665.00 N 5224.28 W 14118.77 9026.04 4619.71 N 5797.33 W 14287.07 9032.54 4625.15 N 5964.93 W 14749.98 9017.04 4691.18 N 6422.84 W 15212.89 9001.54 4757.21 N 6880.76 W Comment KOP: Start Dir @ 10°/100ft: 10400.00ft MD, 8977.94ft TVD Start Dir @ 10.500°/100ft: 10440.00ft MD, 8982.15ft TVD End Dir: 10757.20ft MD, 8989.12ft TVD Start Dir @ 9.000°/100ff: 11559.76ft MD, 8921.23ft TVD End Dir: 11817.85ft MD, 8923.07ft TVD Start Dir @ 9.000°/100ft: 12633.41ft MD, 9012.25ft TVD End DIr: 12812.02ft MD, 9007.12ft TVD Start Dir @ 9.000°/100ft: 13095.71ft MD, 8960.17ft TVD End Dir: 13540.40ff MD, 8962.28ft TVD Start Dir @ 9.000°/100ft: 14118.77ft MD, 9026.04ft TVD End Dir: 14287.07ff MD, 9032.54ft TVD Sail @ 91.919° Inclination on 278.205° Azimuth Total Depth: 15212.89ft MD, 9001.54ft TVD Continued... 22 January, 1999 - 15:36 - 4 - DrillQuest TONY KNOWLE$, GOVERNOR ALASK~ OIL AND GAS CONSERVATION COM~HSSION 3001 PORCUPINE DRIVE ANCHORAGE. ,k~SKA 99501-3192 PHONE: (907) 279-1433 FAX: .907~ 276-7542 November 25. 1998 James E. Smith Senior Drillin~ Enuineer BP Exploration (Alaska) Inc. P O Box 196612 Anchora~,e. AK 99519-6612 Re: Pmdhoe Bay Unit U-02A ARCO Alaska. Inc.. Permit No: 98-239 Sur Loc: 237'NSL. 2434'WEL Sec. 18. TllN. R13E. UM Btmholc Loc. 373'NSL. 2O3'WEL. Sec. i i. T1 IN. R12E. UM Dear Mr. Smith: Enclosed is the approved application for permit to redrill thc above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by lax,,' from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations arc made. Blowout prevention equipment (BOPE) must be tcstcd in accordance with 20 AAC 25 035. Sufficient notice lapproximately 24 hours) must be given to ailow a representative of'thc Com~iLn~s a test of BOPE installed prior to drilling new i~oie. Notice may be given ".;5' ~ tl~nm~s~~~olcum field inspector on ti~e North Siooe pa~er at 03%3607. b,no~'N ~ % '", David W. Jb~on , ~ Chairman ~' BY ORDER OF THE COMSIISSION df/Enclosures cc: Department of Fish & Game. Habitat Section w/o enci. Department of Environmental Conscn'ation w/o cnci. Alaska hared ervlces rilling WELL NAME U-02A DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET The attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT Permit/~ume a~~fi~ Prepared: ODE: /,(7~,... ,,7k,/4t~,2,,,~ Date: Permit ~plication R~wed: SDE~S:~ ~~ Date:'~¢~ Pe~it fi~l~J~n Sub~tted: . PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: APPROVAL TO PROCEED SUNDRY NOTICE [~ Sundry Documentation Prepared: ODE: Date: I~ Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate VariancePull Tubing Sti~ck/k . Other(Explain): ~,__ ~'"D ',vv i3 ~p.~ Z~'~. .. -"~' age ..... "~ton Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: STATE OF ALASKA ALASKA'._ .~ AND GAS CONSERVATION COIv:~.~-ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 77.5' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028260 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 237' NSL, 2434' WEL, SEC. 18, T11 N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 2968' NSL, 271' WEL, SEC. 13, T11N, R12E, UM U-02A At total depth 9. Approximate spud date Amount $200,000.00 373' NSL, 203' WEL, SEC. 11, T11N, R12E, UM 11/26/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047451,373'I No Close Approach 2560 16868' MD / 8954' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9890' MD Maximum Hole Angle 102° Maximum surface 2470 psig, At total depth CrVD) 8800' / 3000 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT-M 7128' 9740' 8599' 16868' 8954' 820 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. 0RIr&INAL Present well condition summary Total depth: measured 10347 feet Plugs (measured) true vertical 9210 feet ~0V Effective depth: measured 10182 feet Junk (measured) Fill at 10182' true vertical 9069 feet""-""°~'Alas~u"~t=asC°ns'C°n~mlssi°r~ Casing Length Size Cemented MD Anchorage TVD Structural Conductor 110' 20" x 30" 8 cu yds concrete 145' 145' Surface 2645' 13-3/8" 3255 cu ft PF 'E', 465 cu ft PF II 2680' 2680' Intermediate 9836' 9-5/8" 2380 cu ft Class 'G' 9871' 8804' Production Liner 741' 7" 270 cu ft Class 'G' 9606' - 10345' 8578' - 9210' Scab Liner 6639' 7" 1028 cu ft Class 'G' 2965' - 9604' 2965' - 8578' Perforation depth: measured 9885' - 9912' (Sag River) 10018' - 10070', 10080' - 10115', 10125' - 10170' (Ivishak) true vertical subsea 8725' - 8749' (Sag River 8842' - 8975' (three Ivishak intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby cer~fy that the fore,going is true and correct to the best of my knowledge Signed a~~"~ J Title Senior Drilling Engineer Date . , Commission Use Only Permit Number APl Number I Approval Date .- I See cover letter 50-029-21170 ---~,/I /J-" r~,,.~'""-~I for other requirements Conditions of Approval: Samples Required I--lYes ~'No Mud Log Required I-lYes ..~'~No Hydrogen Sulfide Measures ~'Yes'~ No Directional Survey Required ~_Yes []No Required Working Pressure for BOPE []2K; 1--13K; 1--14K; [~5K; []10K; []15K Other: ~,rlg,rla: Si.qned By by order of Approved By 0avid W. Johnston Commissioner the commission Date / 1 - C~,~,"T'¢ ¢ Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: I u-o2A Well Plan Summary ]Type of Well (producer or injector): I Producer Surface Location: 237' FSL, 2434' FEL, Sec. 18, Ti iN, R13E X = 631,565 Y = 5,960,810 Target #1 Start: 2968' FSL, 271' FEL, Sec. 13, T11N, R12E X = 628,732 Y = 5,963,493 Z = 8881' TVDss Intermediate 3623' FSL, 383' FEL, Sec. 13, T1 IN, R12E X = 628,609 Y = 5,964,146 Z = 8,941' TVDss Target #1 End: 4403' FSL, 673' FEL, Sec. 13, T1 iN, R12E X = 628,306 Y = 5,964,921 Z = 8,845' TVDss Target #2 Start: 4878' FSL, 1402' FEL, Sec. 13, TllN, R12E X = 627,569 Y = 5,965,384 Z = 8,930' TVDss Intermediate 5023' FSL, 2163' FEL, Sec. 13, T1 IN, R12E X = 626,805 Y = 5,965,516 Z = 8,841' TVDss Intermediate 5160' FSL, 2879' FEL, Sec. 13, TI 1N, R12E X = 626,087 Y = 5,965,641 Z = 8,950' TVDss Intermediate 16' FSL, 3587' FEL, Sec. 12, T1 IN, R12E X = 625,377 Y = 5,965,764 Z = 8,874' TVDss Intermediate 150' FSL, 4294' FEL, Sec. 12, T1 iN, R12E X = 624,668 Y = 5,965,887 Z = 8,956' TVDss Intermediate 294' FSL, 5045' FEL, Sec. 12, T1 iN, R12E X = 623,914 Y = 5,966,018 Z = 8,907' TVDss Target #2 End: 373' FSL, 203' FEL, Sec. 11, T1 iN, R12E X = 623,475 Y = 5,966,090 Z = 8,954' TVDss I AFENumber: 1 4P1078 I Rig: [ Nabors 9ES IEstimated Start Date: 11/26/98 IOperating days to complete: 34 I MD 16,868' ] ITVDss: 18,954, I KBE: 177.5' IWell Design (conventional, slim hole, etc.): Extended Horizontal Sidetrack Objective: Sidetrack out of existing 7" liner into the Sag River formation, directionally drill 6" hole thru (2) ZA targets, TD at 16,868' MD. Run, cmt and test 4 1/2" solid liner, complete with 4 lA", L-80 tbg, (6) GLM's and WOA tail assy. Formation Markers Formation Tops MD TVD(ss) Begin sidetrack 9,890' 8,731' Sidetrack from Whipstock out of 7 "liner into Sag River formation. TShublik 9,906' 8,745' TSAD 10,046' 8,841' TZ4 10,046' 8,841' Target 1 Start 10,259' 8,881' Target 1 End 11,797' 8,845' Target 2 Start 12,682' 8,930' TD - Target 2 16,868' 8,954' Undulating thru both targets HO/T 8,984' OOWC 9,004' Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MDfrVD O.D. 6" 4 1/2" 12.6# L-80 IBT 7,128' 9,740'/8,599' 16,868'/8,954' liner Mod 4 ¥2" 12.6# L-80 IBT 10,620' 30'/30' 9,540'/8,422' compl. Mod Logging Program: I Open Hole Logs: Drilling section: MWD/GR from KOP (9,890') to start target #1. MWD/GRfRes to TD at 16,868' MD. MADD pass as per Geologist request. DPC Platform Express + Sonic will be run after reaching TD. Sample catchers and rig site geologist on site before drill out of window. I Cased Hole Logs None Mud Program: Special design considerations Drill from KOP to TD with MI Flo-Pro Polymer system. The formulation of the brine phase will be 6% KCL. Density LSRV PV Gels Chlorides pH (ppg) (cps) 8.7 55 - 60,000 < 15 10 sec. >18 30,000 9.0-9.5 to to expect to to 8.9 55 - 60,000 8-12 10 min. >20 30,000 9.0-9.5 Record LSRV at 1,2,3 minutes: Make certain they are elevated and flat. Plan to run 3-5 % Lubetex by volume. Start 6", Z4 section at 3 % Sweeps, Liner slugs and CBU sweeps at 150,000 cp w/60-80 rpm & reciprocation the full 90'. Ensure good stocks of LCM on location. Directional: KOP: 1) 9,890' MD, drill out of 7 "liner via whipstock window at 316° azimuth, 28° inclination, build and turn angle to 84° inclination, 350° azimuth to Start target gl at 10,259' MD, 8,964' TVDss', land at 90°at 10,900' MD, 8,943'TVDss, hold azimuth thru entire target gl. Turn and land azimuth to 281° at start target g2, hold azimuth to TD at 16,868' MD, 8,954' TVDss. Maximum Hole Angle: Surface Shut-in Close Approach Well: Point to point separation 102° undulating thru target gl. No wells will need to be shut-in and de- pressurized before rig move on and off of the well. There are no close approach wells to this wellbore identified by Sperry Sun. Cement Data: Casing/Liner Lead: Tail: Sxs/Wt/Yield Comments Sxs/Wt/Yield P&A of original well 127/15.8/1.15 Class "G", TOC 9,750' 432' + 10 bbl 135' above top perfs. 4 V2", 12.6g, L-80 liner 820/15.8/1.15 Class "G", 50% excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter and BOPE system schematics on file with AOGCC. Bottom hole pressure is 3,000 psi at 8,800' TVDss (estimated) through target #1 and 3,350 psi at 8,800 TVDss through target #2. Maximum shut-in casing pressure is 2,470 psi (assumes 0.1 psi/ft gas gradient to surface). NO ANNULAR INJECTION IN THIS WELL. U-09A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Contacts Name Office Home Paqer Bob Kaluza Drilling Eng. 564-5344 563 9059 275-1014 Tony Bunch Drilling Supt. 564-5219 229-0729 275-3703 Bob Metzger Geologist 564 4613 345 2592 223 7187 Daniel Hsi Pad Engr. 564 4513 345 5982 227 0439 Bruce Smith Asset Drilling Eng, 564 5173 345 2948 275 4600 Stuart Montaque Geophysicist 564 4029 561 9500 230 6335 Drilling Discussion Well Obiective The NW fault block of the U - Pad has 129 million reservoir bbls total pore volume, of which approximately 107 million (83%) will be under flood. U-02A is a critical well for flood and MI development, and will be a 7,000' undulating Z4B producer receiving support from three injectors. This well will capture the reserves associated with current producers U-12 and U-02, as well as the undrained region in the western most part of the U pad. The unrisked incremental reserves are 6.02 mmstb. The expected average first year incremental oil rate is 2645 bopd at 60% WCUT and 699 scf/stb GOR. Drilling Objective The drilling objective is to pull the existing 4 ½" x 3 ½" tubing, mill up and retrieve the existing production packer, dress the P & A cement plug to just below the Sag River perforations, set a whipstock and mill through 7' liner casing into the Sag River formation. Directionally drill this 7,000' undulating extended horizontal sidetrack thru two Z4B targets. Run, cement and test 4 ½" liner, perforate and complete with 4 ½" tubing. No large faults are predicted but small faults will occur with the potential for fluid loss. Several small faults (10'-20') have been interpreted, but poor data quality precludes correlation of these faults laterally for any significant mapable extent. The designed well path optimizes structural position and reservoir exposure with undulations that will be geosteered using MWD/GR/Res (real time). The criteria for geosteering are approximately 20' standoff from the HOT and ensuring the wavelength of the undulation is targeted at 1500 feet or less. The well will be completed as a Zone 4B producer with a 4 ½", L-80, 12.6# tubing, (6) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NU/ND. SURFACE CLOSE APPROACH WELL SHUT-INS There is no well that will need to be shut-in during the rig move on and off of the well. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROACH WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plan due to close approach requirements. PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.4 ppg EMW and the Sadlerochit is expected to be near 7.4 ppg. 8.7 - 8.8 ppg mud will be used drilling the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the reservoir pressure. HOLE PROBLEMS The well's design cuts 10 small faults in the reservoir section, however only (2) of the faults are large enough and areally extensive to be mapped. Be prepared for the possibility of lost circulation. The original wellbore, U-02, did not experience lost circulation. Other wells in the intermediate vicinity have experienced minor lost circulation. No major faults have been identified and no major hole problems are expected. H__~_S: U-Pad is not an H2S Pad There are no reported incidents of H2S at well U-02. H2S precautions will be in effect at all times. These include (but are not limited to): · Regular H2S drills (minimum of two per week) · Proper training of all permanent onsite personnel, unescorted visitors and temporary onsite personnel; H2S monitors with both audible and visual alarms; Access to 5-minute emergency escape air packs; Personal H2S monitors; Functional wind indicator; Posted evacuation routes (minimum of two); Muster points in designated safe areas;H_a_S; Functional communications between rig camp and rig floor. Fault Evaluation See Hole Problems. The original wellbore, U-02, did not experience lost circulation. Other wells in the immediate vicinity have experienced lost circulation: U-03, U-11, U-13, U-14, H- 10, H-12, and H-32. Alert: The kick off will be high in the Sag River in a known fault area. There is a remote possibility of drilling into the Kingak shale if a downthrown fault is encountered soon after Kick off. Carefully check return cuttings when drilling out of the window, if the Kingak is encountered we will plug back and kick off deeper. Casing Shoe Kick Tolerance The smallest kick tolerance for the 9 5/8" casing shoe is calculated as infinite of influx assuming a swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg MW (TSAG 9,883' MD & 8,725' TVDss, 7.8 ppg reservoir pore pressure), and min. frac at shoe of 12.0 ppg. SUMMARY PROCEDURE Pre-Ri~ Ooerations: -ozA RU CT RIH to top offish at + 10,182', circ and clean hole. Spot cement from TD (10,182') to 9,750'; hesitation squeeze 10 bbls into open perforations (est. 127 sx, 15.8 ppg, 1.15 yield, 'G' cmO. Open perforations from 9,885' to 10,170'. Cement top MUST NOT be above 9,700' MD (minimum per AOGCC = 9,785' MD or 100' above uppermost perforation and 10,182' MD, total open hole depth below bottom perforations). After spotting and squeezing cement, pull up to 9,750' (top of cement) circulate out any excess cement and circulate well to seawater. 2. Wait 12 hrs. (minimum). RIH with CT, tag cement to verify TOC. . RU electric line and make a tubing chemical cut in the first pup joint above the 7" TIW production packer _+ 9,556' tubing MD. Circulate well to seawater through the cut. Freeze protect to +_ 2,200' MD. Note: use 6 arm chemical cutter. Pup joint above the packer is 10' long. Cut the pup joint 3' below top of joint. 4. Test the 9 5/8" packoff and tubing hanger (through test port) to 5000 psi. If the 9 5/8" packoff tests, completely back out and check each lock down screw for breakage (check one at a time). 5. Set a BPV in preparation of the rig sidetrack. Ri~ Sidetrack Procedure 1. MIRU. ND tree, NU and test BOPE. Circulate well clean. . 2. Pull the 4 V2" x 3 V~." tubing completion. Tubing cut during pre-rig at 3. Replace ~e le~ng 9 5/8" packoff if necess~. 4. RIH w/3 V2" Overshot, retrieve 'G' seal assy.. ~H relieve K-~chor. 5. Mill up and retrieve the Brown 3-H packer. 6. ~ w/Drill out assembly tag cement and test casing to 3,000 psi. Dress cement to ~ 9,905'. Ckc well. POOH. 7. Set 9 5/8"whipstock on cement top and mill window ~ Sag prefs. 8. ~ck-off ~d dkecfionally &ill 6" hole to 16,868' TD. 9. Run DPC log suite at TD. 10. Run and cement 4 V2", L-80 solid production liner(cement behind the entire liner). 11. Perforate DPC 12. Run 4 W', L-80 tubing completion. 13. ~ BOPE, ~ and test ~ee. ~MO. TREE: 4" - 5M - McEVOY WELLHEAD: 13-5/8" - 5M - McEVOY - SSH ACTUATOR: OTIS 4 1/2" 12.6# L-80 BTRS TBG TUBING ID -3.958" CAPACITY: 0.0152 EEL/FT. 2680' 2965' 2970' CMT'd 13 3/8" 72#/ft L-80 BTRS 7" TIW S-6 LINER TOP PACKER 7" TIW LINER HANGER 3 1/2" 9.3# L-80 EUE 8RD TUBING TUBING ID: 2.992" CAPACITY: 0.0087 BBL/FT KOP: 3037' MAX ANGLE: 38° @ 5470' 7" 26# L-80 TC4S SCAB LINER U-U: KB ELEV = 84.96' [ .EV = 49.48' 4 1/2" SSSV LANDING NIPPLE I (OTIS) (3.813" ID) 2082' 4-1/2" GLM top at 2888'[CAMCO W/1-1/2"] With broken RK Latch NO. 6. 4.5" Tubing Patch (OD=3.75", ID= 3.25" Length = 21.75') over GLM #6, top seal at 2885.5' DD HOLE IN 9-5/8" CASING 3150-3188' 4 1/2"x 3 1/2" X-OVER I 5543' I i i 3 1/2" GAS LIFT MANDREL~ McMurmy w/[ 1 "BK-2 LATK] No. MDBKB -I-VDss 41/2" 6 see above 2803' 5 5553' 5065' 4 7374' 6558' 3 8534' 7558' 2 9285' 8199' 1 9628' 8410' 7" BAKER SEAL ASSY , STEM w/SEALS I 9604' TOP OF BAKER I 9606' I 9 5/8" 47# L-80 BTRS PERFORATION SUMMARY REF: LOG: BHCS 9-4-84 21/8" I 4 21/8" I 4 21/8" I 4 41/2" I 4 ~ 11//~" ~ 9868' I -- INTERVAL OPEN/SQZ'D 9885-9912' 10,018-10,070' 10,080-10,115' 10,018-10,070' 10,080-10,095' 10,125-10,170' OPEN/5-10-88 OPEN/7-31-85 OPEN/7-31-85 REPERF/8-16-90 REPERF/8-16-90 OPENF/-31-85 PBTD 7" 29# L-80 BTRS 110,303' I I 10,345' I 3 1/2 .... SWS" NIPPLE (PARKER) (2.75" ID) 7" TIW PACKER (HBBP) (3.875" ID) 3 1/2" "SWS" NIPPLE (PARKER) (2.75" ID) 3 1/2 .... SWS" NIPPLE (PARKER) (2.75" ID) 3 1/2" WLEG (PARKER) (2.99" ID) ~1 SAGRIVER (ELMD) 9567' 9607' 9628' 9639' 9636' REPERFS 2" X 7" BULLNOSE FROM PERF GUN LOST 7-27-89 AT PBTD 10,182' ELMD. DATE 9-8-84 REV. BY COMMENTS INITIAL COMPLETION 8-22-90 LGM 1990 RIG WORKOVER 4-9-92 A. TEEL REVISED 9/3/94 J. Attid Tubing Patch over GLM # 6 PRUDHOE BAY UNIT WELL: U-02 (42-13-11-12) APl NO: 50-029-21170 SEC 18; TN 11N; RGE 13E BP Exploration (Alaska) TREE: 4"-EM-McEVOY UgU2 Pre-Rig KB. ELEV=84.96' WELLHEAD: 13-5/8" - 5M - McEVOY - SS~ . ' ...... BF. ELEV = 49.48' ACTUATOR: OTIS 4 1/2" SSSV LANDING NIPPLE 2082' O (OTIS) (3.813" ID) 4 1/2" 12.6# L-80 BTRS TBG TUBING ID -3.958" CAPACITY: 0.0152 EEL/FT. 4-1/2" GLM top at 2888'[CAMCO W/1-1/2"] With broken I ~ RK Latch NO. 6. CMT'd -- ~[~ L~ 4.5" Tubing Patch (OD=3.75", ID= 3.25" 2680' 13 3/8" 72#/ft L-80 BTRS ~ k Length = 21.75') over GLM #6, top seal at 2885.5' DD 2965' 7" TIW S-6 LINER TOP PACKER ~-~.-'~: :*;'"~*~ HOLE IN 9-5/8" CASING 3150-3188' 2970' 7" TIW LINER HANGER ~i / i~ 4 1/2" x 3 1/2" X-OVER 5543' I 3 1/2" 9.3# L-80 RUE 8RD TUBING ~.~ ~:~.~;{~? 3 1/2" GAS LI~ MANDRELS ¢~,;~s. ¢~?~;$$~ McMurray w/[ 1 "BK-2 ~TK1 TUBING ID: 2.992" ;";~ B~4~$ No. MDBKB ~Dss ............. CAPACI~: 0.0087 BBU~ ;~¢~ ;~ ~ 4 1/2" [ I '~' ~'~; 15 5553' 5065' KOP: 3037' MAX ANGLE: 38° e 5470' ;~ ~ 4 7374' 6558' ~ ;~ 3 85~' 7558' ~ ~ 2 9285' 8199' 7" 26ff L-80 TC4S SCAB LINER ~ ~; 1 9528' ~10' STEM w/SEALSI 9604'I I ~ ~Tubing Cut 9,556' 7" LINER TIE BACK ~. .. ~ 3 1/2" "SWS" NIPPLE 9552' ~~~ X~ (PARKER) (2.75" ID) 7" TIW PACKER 9567' ~ (HBBP) (3.875" ID) ~ ~ ~ (PARKER) (2.75" ID) 9607' 9 5/8" 47¢ L-80 BTRS 9868' ~ (PARKER)(2.75" ID) 9628' PERFORATION SUMMARY ~ 3 1/2" WLEG REF: LOG: BHCS 9-4-84 ........................ ~~ (PARKER) (2.99" ID) 9639' 2 ~/a" 4 ~aas- ~2' o~[~/s-~o-~a p of Gement 0,750' 2 ws" 4 ~o,o~8 - ~o,o7o' o~fi~-a~-ss KO~ 2 1/8" 4 10,080- 10,115' OPEN~-31-85 4 1/2" 4 10,080- 10,095' REPERF/8-16-90 2 1/8" 4 10,125 - 10,170' OPEN~-31-85 ........................... ......................... .....  2" X 7" BULLNOSE FROM PERF GUN PBTD I 10,303' I LOST 7-27-89 AT PBTD 10,182'ELMD. .T.S I 0,a45' 9-8-84 INITIAL COMPLETION 8-22-90 LGM 1990 RIG WORKOVER WELL: U-02 (42-13-11-12) 4-9-92 A. TELL REVISED 9/3/94 J. A~id ubing Patch over GLM ¢ 6 BP Exploration (Alaska) 3 1/2" GAS LIFT MANDRELS McMurmy w/[ 1 "BK-2 LATK1 No. MDBKB TVDss 41/2" 6 8¢~ above 2803' 5 5553' 5065' 4 7374' 6558' 3 8534' 7558' 2 9285' 8199' 1 9528' 8410' TREE: 4" CIW - 5M - McEvoy WELLHEAD: 13 R/IR" - RM - Mc. Ewv 13 3/8" 72# L-80 BTRS 2680' CMT'd -- 7" TIW S-6 Top Packer 2,965' I -- -- 4 1/2", 12.6#/ft, L-80 TUBING ID: 3.958" U-02A KB. ELEV = 77.46 SSSV LANDING NIPPLE I 2082' (~TI -'~ ! ~ o~'~" GAS LIFT MANDRELS CAMCO w! RK _ATCH) 1 2 3 4 5 6 7", 26#, L-80, TC4S Scab Liner 4-1/2" X Nipple @ 9,488' MD 7" Production Packer @ 9,498' MD 4-1/2" X Nipple @ 9,518' MD 4-1/2" XN Nipple @ 9,528' MD 7" BAKER TIEBACK RECEPTACLE 9,606' 9 5/8" 47# L-80 BTRS I 9,868' I KOP I 9,868' Whipstock @ 9,910' MD PERFORATION SUMMARY REF LOG: SWS - BHCS 11-14-86 SIZE SPF INTERVAL OPEN/SQZ'D FISH: 2" x 7" Bullnose from Perf Gun I 10,182' PBTD I 101303' 7", 47# L-80 IJ4S I 10,345' J -1/2" Liner Top @ 9,740' MD 4-1/2 12.6# L-80 IBT-mod Liner TD @ 16,868' MD PBTD @ 16,788' MD All Perforations Plugged during Pre-Rig work DATE 9-8 - 84 REV. BY 9 -3- 94 COMMENTS INITIAL COMPLETION 8-22-90 LGM POST 1990 WORKOVER 4 - 9 - 92 A. TEEL REVISED J. Attid Tubing Patch over GLM #6 BP PRUDHOE BAY UNIT WELL: U-02A {42-13-11-12) APl NO: 50-029-21170 SEC 18; TN 11N; RGE 13E Exploration (Alaska) I Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad U-02A - bnarea Services Drtlling Well' U-O2A Wp2 Scale: linch = 80Oft -8q00 4 1/2' Liner MD -7~00 -SE Eastings DRAFT COPY FOR P[ANNIN6 PURPOSES ONlY 8989.70 9038.70 ~.02~112-1nt3 PRELIMINARY /~-4rZ~/2-/nt ! Po/hr P=/nt 9032.70 SURFACE LOCATION PLOT DATE: 15-Jul-98 Horizontal Coordinates: 5960810.00 N. 631565.00 E Created By: RKB Elevation: ~ 35.30 ItRig (EST) 47.46 It We# (CBE) 82.76 It RKB - AMSL Checked By Coordinate System: NAD27 Alaska State Zone 4. US Foot -f Approved By: DRAFT ONLY 40,~9.2, 7 ~. Point 8927.7~ 4107.43N. I)-02~1Tl-ln$ Point ~023. Y0 I)-02d TI- ! P~in~ 8903. Y0 2732.19]t I i I -7200 -6400 -5600 I -4800 Eastlngs 1 -4000 I -3200 I DrillQuest' 40OO -8000 -2400 Scale: linch = 800ft Reference is True North Well: U-O2A Wp2 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad U-02A - D FT COPY FOR PLANNING PURPO. E5 PRELIMINARY ONlY 15-Jul-98 SURFACE LOCATION,IPLOT DATE J Horizontal Coordlnate~: 5960810.00 N. 631565.00 E I Created By: IRKB Elevation: 35.30 ft R~g (EST) I 47.46 It Well (CBE) 82.76 It RKB - AMSL ~ Checked By: I Coordinata System: NAD27 Aiaska State Ptane~. Zone 4. US Fool! Approved By-. I DrillQuest' Proposal Data for U-02A Wp2 J V~l ~: Well No~h Rele~eeee: Tree Nor~ ! Vertical Section ~n: 0.~ N.O.~ E Mealul~ Ifl~. ~im. VeStal N~ingl EastinglVe~lcalO~ 9890.00 27 ..',aS 3t,~ II0 8113.94 2435OO N 20y3 ~l w 3541.78 102~ 02 X4 071 ~9.347 ~2 8S 272) a~ N2'~a ,~ W ~762 34 10258 ~ ~.1013~.37~ R~3.76 27~.19 ~ 2'~ ~9 W~76~ 73 102~8 55 ~.101~3~5 8~3.76 2~32 2o ~273~ ~9 w 1~26.~95,~ 3~.~ ~23.76 3317.39 N~SO~W 4186.2~ t~88.16 102.120 352.1~ ~14.~6 3~.73 N 2~1 w 4224.15 12.~ 11312.28 102.1~ 352,1~ ~.51 3761.63 N:9~0 03 W ~1607 O~ 117~6383.1 Il ~7,735 8927.76 4167.43 N3130.~2 w a~31.23 10.~ I1~.~ 82.113 307.135a~7.76 4167,~ N 3186.52 W 4821.23 I0~ 12379.16 83.113 307.73~~7.70 4~.37 N 3~2.~5 W 12~1~ ~.~ 2~.8~ ~12.76 a~3.27 N ~91~.30 w 5689.73 to.~ 127~.~98.~82~.8~ ~.~ ~7.47 N 393730 W5710.9~ 10~ 13~1.71 98,~12~,129 ~4.12 4758J9 N 4~18.:1 W 6271.~0,~ I~.~ 82.~ 2M.~ B~3.76 4789.~ N ~.36 w ~2S.2610.~ 1~17.~79.~52~,~ 8~7J2 4~3.31 N 47~.21 W~7.32 IO.~ l~3l.l/ ~.~l 2~.~5 ~6J7 4~J,13 N 523248w 6~1 ~ o.~ 14~17.19 97,476 3~,~5 ~31,o3 4~.~ N ~.u w 7129,7~ lo.~ 14783~1 97.476 2~.N5 ~7~ ~.ll N ~951.19 W t~l.~ o.~ 14~1.14 13.~ 2~.~ ~M.76 ~2.~ N 61~.~ w 7798.86 IO.~ 149~2.~ 82.610 2~.~ 89~7.25 5~.73 N 6103,80 w 1~5~9.62 12,610 2~.~ ~5.~ 5175.~ N ' ~9~.~ W 8373,~0.~ 15~3.52 ~.~ 2~.~ ~8,76 5197,~ N ~07.30 w~81.4~10.~ 15657.28 ~.~9 2~.881 ffi38.a95197.71 N~10.98 W~.98 10.~ 16316.79 ~.~9 2~.881 1981.2~ 3321.~ N 74~.76 w9108.~o.~ 1~20.97 83.~ 2~.~7 ~89.76 5~ I,~ N 75~9,~ W9207.~10.~ 1~67.~83.~ 2~.~7 ~.16 ~.~ N 7~.31 W ~27.3J0.~ I 27,.~2. lO W'. 2Z&5'~IV'" I 33,~?~0 t~. Z$O?.O0 w 3500 4200 4900 5600 6300 7000 7700 8400 9100 9800 Scale: linch = 7bOlt Vertical Section Section Azimuth: 299.380' (True North) Prudhoe Bay Unit Measured Depth Incl. Azim. (~) 9890.00 27.548 315.810 9900.00 29.505 318.928 9905.82 30.675 320.573 10000.00 51.280 337.146 10045.51 61.770 341.822 10100.00 74.494 346.341 10140.77 84.071 349.347 10200.00 84.071 349.347 10250.02 84.071 349.347 10258.54 84.101 350.375 10258.55 84.101 350.375 10300.00 84.101 ' 350.375 10400.00 84.101 350.375 10500.00 84.101 350.375 10600.00 84.101 350.375 10700.00 84.101 350.375 10800.00 84.101 350.375 10835.47 84.101 350.375 10900.00 91.841 350.109 10926.34 95.000 350.000 10988.16 102,120 11000.00 102.120 11100,00 102.120 11200.00 102.120 71300.00 102.120 PRELIMINARY Sperry-Sun Drilling Services Proposal Report for U-O2A Wp2 Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 8731.18 8739.96 8745.00 8815.92 8841.00 8861.26 8868.84 8874.95 8880.12 8881.00 8881.00 8885.26 8895.54 8905.81 8916.09 8926.37 8936.64 8940.29 8942.57 8941.00 8813.94 2435.00N 2693.61W 8822.72 2438.52 N 2696.84W 8827.76 2440.75 N 2698.72W 8898.68 2493.88 N 2728.66W 8923.76 2529.41 N 2741.85W 8944.02 2577.94 N 2755.60W 8951.60 2617.05 N 2764.01W 8957.71 2674.95 N 2774.90W 8962.88 2723.85 N ~2~84.09W__ 8963.76 2732.19 N 85.59W 8963.76 ~ 27 785.59W 89~11t3(3~, ~870.92 N 2809.11 W ~11~~ 2968.99 N 2825.74 W '~l~-J 3067.06N 2842.38W 9009.13 3165.13N 2859.01W 9019,40 3263.20 N 2875.64W 9023.05 3297.98 N 2881.54W 9025.33 3361.50 N 2892.46W 9023.76 3387.39 N 2897.00W 352.106 8931.80 9014.56 3447.73 N 2906.51W 352.106 8929.32 9012.08 3459.20 N 2908.10W 352.106 8908.32 8991,08 3556.04 N 2921.53W 352.106 8887.32 8970.08 3652.89 N 2934.98W 352.106 8866.33 8949.09 3749.73~~ 2948.38W Global Coordinates Dogleg Vertical Northings Eastings Rate' Section (fi) (fi) (°/100fi) (fi) 5963197.47 N 628829.17 E 3541.78 5963200.92 N 628825.88 E, 24.580 3546.32 · 5963203.12 N 628823.95 E,, 24.580 '3549.06 5963255.72 N 628793.09 E 24.580 3601.21 5963291,01 N 628779.28 ~ 24.580 3630,13 5963339,30 N 628764.68 E', 24.580 3665.93 5963378.26 N 628755,59 E ' 24.580 3692.44 5963435.96 N 628743.69 E 0.000 3730.34 5963484.68 N 628733.64 E 0.000 3762.34 5963493.00 N 628732.00 E 12.000 3767.73 5963493.00 N 628732.00E 12.000 3767.74 5963533.53 N 628724.39 E 0.000 3793.69 5963631.29 N 628706.05 E 0.000 3856.29 5963729.06 N 628687.70 E 0.000 3918.90 5963826.82 N 628669.36 E 0.000 3981.50 5963924.59 N 628651.01E 0.000 4044.11 5964022.35 N 628632.67 E 0.000 4106.71 5964057.02 N 628626.16 E 0.000 4128.92 5964120,33 N 628614.13 E 12.000 4169.59 5964146.15 N 628609.13 E 12.000 4186.25 5964206.31 N 628598.57 E 12.000 4224.15 5964217.75 N 628596.78 E 0.000 4231.16 5964314.34 N 628581.65 E 0.000 4290.37 5964410.94 N 628566.53 E 0.000 4349.58 5964507.53 N 628551.41 E 0.000 4408.80 FOR DRAFT COPY PLANNING PURPOSES Ol kY 'A,aska State plane Zone 4 PBU_WOA U Pad Comment KOP: Start Dir @ 24.580°/100fi: 9890.00ft MD, 8813.94ft TVD Shublik Top SadlerochiVTZ4 End Dir, Sail @ 84.071°: 10140.77ft MD, 8951.60ft TVD Start DIr @ 12.000°/100ft: 10250.02ft MD, 8962.88ft 'Pv'D .~ End DIr. Sail @ 84.101°: 10258.54ft MD 8963 76ft TVD Target: U-02A T1-1, Ddllers r ' ' ' -. Start DIr @ 12.000°/100ft: 10835.4.7ft MD, 9023.05ft TVD faOntinue DIr @ 12.000°/100ft: 10926.34ft MD, 9023.76ft 'l-VD rget: U-02A Tl-lnt, Geologica ..~ End Dir, Sail @ 102.120°: 10988.16ft MD, 9014,56ft 'I'VD Continued... 15 July, 1998- 15:27 - 1- DrillQuest Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (~) (~) (~) 11312.28 102.120 352.106 8863.75 8946.51 11400.00 98.694 343.895 8847.88 8930.64 11500.00 94.581 334.716 8836.30 8919.06 11600.00 90.353 325.643 8831.99 8914.75 11700.00 86.116 316.579 8835.07 8917.83 11796.63 82.113 307.735 8845.00 8927.76 11796.64 82.113 307.735 8845.00 8927.76 11800.00 82.113 307.735 8845.46 8928.22 11900.00 82.113 307.735 8859.18 8941.94 12000.00 82.113 307.735 8872.91 8955.67 12100.00 82.113 307.735 8886.63 8969.39 12200.00 82.113 307.735 8900.35 8983.11 12300.00 82.113 307.735 8914.08 8996.84 12379.16 82.113 307.735 8924.94 9007.70 12400.00 83.049 305.857 8927.63 9010.39 12500,00 87.625 296.934 8935.77 9018.53 12600.00 92.259 288,070 8935.88 9018.64 12681.50 96.000 280.809 8930.00 9012.76 12700.00 97.850 280.825 8927.77 9010.53 12704.08 98.258 280.829 8927.20 9009.96 12800.00 98.258 280.829 8913.42 8996.18 12900.00 98.258 280.829 8899.06 8981.82 13000.00 98.258 280.829 8884.70 8967.46 13100.00 98.258 280.829 8870.33 8953.09 13200.00 98.258 280.829 8855.97 8938.73 Sperry-Sun Drilling Services Proposal Report for U-O2A Wp2 Local Coordinates Northings Eastings (~) (~) 3761.63N 2950.03W 3845.92 N 2967.98W 3938.71N 3003.07W 4025.27 N 3052.70W 4102.98 N 3115.36W 4167.43N 3186.52W 4167.44N 3186.52W 5964~21.00 N 423O. lO. 3267.~~,.~2.23, 4351.~,~,,'3~,24.1~ 59651oo.72. ~~-~.ao.64w 59~521~.20N ~~' 3542.85W 5965266,09 N 4~95N 3659.40W 5965278,18 N 4584.78 N 3744.38W 5965328.52 N 4623.00N 3836.65W 5965365.12 N 4643.27 N 3915.30W 5965384.00 N 4646.71N 3933.34W 5965387.13 N 4647.47 N 3937.30W 5965387.82 N 4665.31N 4030.54W 5965404.02 N 4683.90 N 4127.74W 5965420.91N 4702.49 N-~ 4224.94W 5965437.79 N 4721.08 N 4322.14W 5965454.68 N 4739.68 N 4419.34W 5965471.57 N Global Coordinates Northings Eastings (~) (~) 5964519.40 N 628549.55 E 5964603.36 N 628530.13 E 5964695.52 N 628493.42 E 5964781.20 N 628442.29 E 5964857.80 N 628378.27 E 5964921.00 N 628306.00 E 628306.00 E 628303.33 E 628223.94 E 628144.56 E 628065.17 E 627985.78 E 627906.40 E 627843.55 E 627826.79 E 62774O.92 E 627647.99 E 627569.00 E 627550.90 E 627546.93 E 627453.39 E 627355.88 E 627258.37 E 627160.85 E 627063.34 E Dogleg Vertical Rate Section (°/100fi) (fi) 0.000 4416.07 10.000 4473.06 10.000 4549.16 10.000 4634.87 10.000 4727.60 10.000 4821.23 10.000 4821.23 0.000 4824.52 0.000 4922.53 0.000 5020.53 0.000 5118.53 0.000 5216.53 0.000 5314.54 0.000 5392.12 10.000 5412.61 10.000 5512.09 10.000 5611.24 10.000 5689.72 10.000 5707.13 10.000 5710.95 0.000 5800.95 0.000 5894.77 0.000 5988.59 0.000 6082.41 0.000 6176.23 FOR COPY PLANNING'PURPOSES 0~LY Alaska State Plane Zone4 PBU_WOA U Pad Comment Start'Dir @ 10.000°/100fl: 11312.28ft MD, 8946.51ft TVD End Dir, Sail @ 82.113": 11796.64ft MD, 8927.76ft TVD Target: U-02A T1-2, Drillers Start Dir @ 10.000°ll00ft: 12379.16ft MD, 9007.70ft TVD Continue DIr @ 10.000°/100ft: 12681.50ft MD, 9012.76ft TVD Target: U-02A T2-1, Drillers End Dir, Sail @ 98.258°: 12704.08ft MD, 9009.96ft TVD Continued... 15 July, 1998 - 15:27 .2 - DrillQuest Prudhoe Bay Unit PRELIMINARY Measured Sub-Sea VeHical Depth Incl. Azim. Depth Depth (~) (~) (~) 13300.00 98.258 280.829 8841.61 13301.71 98.258 280.829 8841.36 13400.00 88.429 280.817 8835.64 13464.29 82.000 280.809 8841.00 13487.86 79.645 280.895 8844.76 13500.00 79.645 280.895 8846.94 13600.00 79.645 280.895 8864.92 13700.00 79.645 280.895 8882.89 13800.00 79.645 280.895 8900.87 13900.00 79.645 280.895 8918.64 14000.00 79.645 280.895 8936.82 14038.87 79.645 280.895 8943.81 14100.00 85.757 280.863 8951.57 14200.00 95.757 280.810 8950.25 14202.43 96.000 280.809 8950.00 14217.19 97.476 280.845 8948.27 14300.00 97.476 280.845 8937.49 14400.00 97.476 280.845 8924.48 14500.00 97.476 280.845 8911.47 14600.00 97.476 280.845 8898.46 14700.00 97.476 280.845 8885.45 14783.38 97.476 280.845 8874.60 14800.00 95.814 280.841 8872.68 14900.00 85.814 280.816 8871.26 14928.14 83.000 280.809 8874.00 Sperry-Sun Drilling Services Proposal Report for U-O2A Wp2 DP~F~ COPY FOR PLANNING PURPOSES Alaska State Plane Zone 4 ONLY U Pad Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (fi) (ft) (ft) (ft) (°/100ft) (ft) Comment 8924.37 4758.27 N 4516.55W 5965488.46 N 626965.83 E 0.000 6270.06 8924.12 4758.59 N 4518.21W 5965488.74 N 626964.16 E 0.000 6271.66 8918.40 4776.99 N 4614.47W 5965505.46 N 626867.60 E 10.000 6364.57 8923.76 4789.00N 4677.36W 5965516.37 N 626804.50 E 10.000 6425.26 8927.52 4793.38 N 4700.21W 8929.70 4795.64N 4711.94W 8947.68 4814.23 N ~.t~08.54W 8965.65 4832.83N ~,~1~05.14W 89~.~ 4851.4~'~.\ ~.73 w ~ 4926.50N 5392.45W .03~.0~ .~2~.2s. 540~.8sw 9020.25 4944.70 N 5487.49W 9007.24 4963.36 N 5584.87W 8994.23 4982.01N 5682.25W 8981.22 5000.67 N 5779.63W 8968.21 5019.33 N 5877,00W 8957.36 5034.88 N 5958.19W 8955.44 5037.99 N 5974.41W 8954.02 5056.75 ~ 6072.50W 8956.76 5062.00 N 6100.00W 5965520.35 N 626781.58 E 10.000 6447.32 5965522.40 N 626769.81 E 0.000 6458.65 5965539.30 N 626672.90 E 0.000 6551.95 5965556.20 N 626576.00 E 0.000 6645.24 5965573.10 N 626479.09 E 0.000 6738.54 5965590.00 N 626382.18 E 0.000 6831.84 5965606.90 N 626285.27 E 0.000 6925.13 5965613.46 N 626247.60 E 0.000 6961.40 5965623.86 N 626187.89 E 10.000 7018.87 5965640.91N 626089.50 E 10.000 7113.55 5965641.33 N 626087.12 E 10.000 7115.84 5965643.83 N 626072.67 E 10.000 7129.74 5965657.86 N 625991.77 E 0.000 7207.58 5965674.81 N 625894.08 E 0.000 7301.59 5965691.76 N 625796.39 E 0.000 7395.60 5965708.70 N 625698.70 E 0.000 7489.61 5965725.65 N 625601.01 E 0.000 7583.61 5965739.78 N 625519.56 E 0.000 7661.99 5965742.60 N 625503.29 E 10.000 7677.65 5965759.65 N 625404.89 E 10.000 7772.32 5965764.42 N 625377.30 E 10.000 7798.86 Start Dir @ 10.000°/100ft: 13301.71ft MD, 8924.12ft TVD aagnflnue Dlr @ 10,000°/100ff: 13464.29ft MD, 8923.76ft 'I-VD SadlerochiFTZ4 et: U-O2A T2-1ntl, Geological End Dir, Sail @ 79.645°: 13487.86ft MD, 8927.52fl ']'VD Start DIr @ 10.000°/100ff: 14038.87ft MD, 9026.57ft TVD .~arnflnue Dir @ 10.000°/100fi: 14202.43ft MD, 9032.76ft TVD get: U-02A T2-1nt2, Geological End Dtr, Sail @ 97.476°: 14217.19ft MD, 9031.03ft TVD Start Dir @ 10.000°/100ft: 14783.38ft MD, 8957.36ft,TVD Continue Dir @ 10.000°/100fi: 14928.14ft MD, 8956.76ft TVD Target: U-02A T2-1nt3, G.eological Continued... o 3. DrillQuest 15 July, 1998 - 15:27 Prudhoe Bay Unit Measured Depth Incl. (ft) Azim. 14932.04 82.610 280.806 1500o.00 82.610 280.806 15100.00 82.610 280.806 15200.00 82.610 280.806 15300.00 82.610 280.806 15400.00 82.610 280.806 15500.00 82.610 280.806 15539.62 82.610 280.806 15600.00 88.648 280.807 15653.52 94.000 280.809 15657.28 94.369 280.881 15700.00 94.369 280.881 15800.00 94,369 280.881 15900.00 94.369 280.881 16000.00 94.369 280.881 16100.00 94.369 280.881 16200.00 94.369 280.881 16300.00 94.369 280.881 16316.79 94.369 280.881 16400.00 86.059 280.455 16420.97 83,965 280.347 16500.00 83.965 280.347 16600.00 83.965 280.347 16700.00 83.965 280.347 16800.00 83.965 280.347 PREL M NARY Sub-Sea Ve~ical Depth Depth (~) (~) 8874.49 8957.25 8883.23 8965,99 8896.09 8978.85 8908.95 8991.71 8921.82 9004.58 8934.68 9017,44 8947.54 9030.30 8952,64 9035.40 8957,24 9040.00 8956.00 9038,76 8955.73 9038.49 8952,47 9035.23 8944,85 9027.61 8937.24 9020.00 8929,62 9012.38 8922.00 9004.78 8914.38 8997.14 8906.77 8989.53 8905,49 8988.25 8905.18 8987.94 8907,00 8989.76 8915.31 8998.07 8925.82 9008.58 8936.34 9019.10 8946.85 9029,61 Sperry-Sun Drilling Services Proposal Report for U-O2A Wp2 FOR Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°nOOft) (ft) Comment 5062.73 N 6103.80W 5965765.07 N 5075.36 N 6170.00W 5965776.55 N 5093.95 N 6267.41W 5965793.43N 5112.55 N 6364.83W 5965810.32 N 5131.14 N 6462.24W 5965827.20 N 5149.73N 6559.65W~ 5965844.08N 5168.32N 6657~(;l~'~k'~r5965860.97N 5175.69N 6,~~ 5965867.66N 5186.97N 17~W 5965877.90N 5197.00N ~BOW 5965887.01N ~ 6810.98W 5965887.65 N 6852.81W 5965894.96 N 6950.73W 5965912.06 N 7048.65W 5965929.17 N 7146.56W 5965946.27 N 5281.03 N 7244.48W 5965963.38 N 5299.86 N 7342.40W 5965980.48 N 5318.68 N 7440.31W 5965997.59 N 5321.84 N 7456.76W 5966000.46 N 6337.23 N 7538.45W 5966014.42 N 5341.00N 7559.00W 5966017,83 N 5355.12 N 7636.31W 5966030.59 N 5372,98 N 7734.14W 5966046,73 N 5390.84 N-~ 7831.97W 5966062.88 N 5408.70 N 7929.80W 5966079.02 N 625373.49 E 10.000 7802.53 625307.07 E 0.000 7866.42 625209.35 E 0.000 7960.42 625111.63 E 0.000 8054.43 625013.91E 0.000 8148.48 624916.19 E 0.000 8242.43 624818.47 E 0.000 8336.44 624779.75 E 0.000 8373.68 624720.45 E 10.000 8430.73 624667.75 E 10,000 8481.43 624664.05 E 10.000 8484.98 624622.09 E 0.000 8525.38 624523.86 E 0.000 8619.93 624425.62 E 0.000 8714.49 624327.39 E 0.000 8809.05 624229.16 E 0.000 8903.61 624130.93 E 0.000 8998,16 624032.70 E 0,000 9092.72 624016.21 E 0.000 9108.60 623934.25 E 10.000 9187,34 623913.64 E 10.000 9207.09 623836.09 E 0.000 9281.39 623737.96 E 0.000 9375.40 623639.84 E 0.000 9469.41 623541.71E 0.000 9563.42 End Dir, Sail @ 82.610° ! 14932.04ft MD, 8957.25ft TVD Start Dir iD 10,000°/100fi: 15539.62ft MD, 9035.40ft TVD aOntinue D r iD 10,000°/100ft: 15653 52ft MD, 9038.76ft TVD rget: U-02A T2-1nt4, Geological ' End Dir, Sail iD 94.369°: 15657.28ft MD, 9038.49ft 1-VD ., Start Dir iD 10,000°/100fi: 16316.79ft MD, 8988.25ft TVD j~nd D r, Sail iD 83.965° · 16420 97ft MD 8989.76ft TVD arget: U-O2A T2-1nt5, G'eologlc~l ~, ' Continued.,. July, 1998 - 15:27 - 4 - DrillQuest erry- -un unlling Services PRELIMINARY Proposal Report for U-O2A Wp2 ~O~ OUL ' ' -- Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) ,,.~) (ft) (ft) ("'/~ 00ft) (ft) 16867.99 83.965 280.347 8954.00 9036.76 5420.84.N ~a~,'~kg~-~JB1 W 5966090.00 N 623475.00 E 0.000 9627.33 Total Del3th: 16867.99lt MD. 9036.76ft TVD 4 1/2' I.iher SJ~ Target: U-02A T2-2. Geological ..~., All data is in feet unless otherwise stated. Directions and cooj,j~e relative to True North. Vertical depths are relative to Well. Northings and Easting~i~i~l~er~lative to Well. The Dogleg Severity is in Degrees per lO0ft. Vertical Section is from Well and calculated along al~u'th of 299.380° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 16867.99ft., The Bottom Hole Displacement is 9660.56ft., in the Direction of 304.134° (True). July, 1998 - 15:27 - 5 - DrillQuest U-4 [] U-,.'l · ~... .... NOTES 2. REFEREhCE FIELD BOOK WOA-~3-21 (PGS. 44 THRU 45). 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, ALASKA, NAD27;;:: ::~ :. []U-6 [] U-11' 1.1-8 LEGEND ~ AS-BUILT WELL . · EXISTING WELLS [] · U-lO LOCATED W1THIN PROTRACTED:SEC. 19, T, 11 N., R. 1.3 E., U.M., AK. WELL A.S.P. PLAN~'~ GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION BOX ELEV. OFFSETS ¥=5,960,569.07 N.1185.00 70'18'01.157" 1745' FEL U-14- X= 632f258.4,_3 E.1710~4-2 148'55'q-.3.652" 46,9' 16' FNL I 0 712193 REV. DATE ORIGINAL AS-BUILT ISSUE- '~ REV I S IONS ;,. VICINITY MAP N.T.S. %~ ':' :' o ,:, o,~ ~, a oe°°~' SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OFDATE JUNE 28, 1993. U PAD CONDUCTOR AS-BUILT WELL U-14 I°^'~: IDI~A~fll: CHECK: APPROVAL: I I 7/2/95 I MINISH I ~F~,~INNE~ ~ 'let: I 'l 1"~300' I I UPaDAB )~AWNI CHECKI 'l / UPADAB , or1 I0 F. R. BELL & ASSOCIATES ARCO Alaska Inc. DRAWING N~: , I I , · O0143066 VENDOR ALASKAST 1 4 I DATE INVOICE / CREDIT MEMO DESCRIPTION I GROSS I DISCOUNT I NET 092198 CK092 t 9S.'l,. i ~2-L~-. ~:-.:_ _ In.'-,.~,. 0r-..=. HANDLIN~ INST' S/H CAROL ~ITHE'F ×41';,'$ *HE ATTACHED CHECK IS IN PAYMENT FOR fiEldS DESCRIBED ABOVE. ~e]llllr-~ll~ ~ i i'-',(-~ t"'". t*'"j i .~ .-'"~..---. BP EXPLORATION (ALASKA), INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND. OHIO 56~389 No. H 143066 CONSOLIDATED COMMERCIAL ACCOUNT., 412 OO14306& PAY To The CT` d eT' ONE HUNDRED ~ ******************************************* US DOLLAR ALASKA STATE DEPT OF REVENUE 3001 PORCUPINE DR ANCHORAGE AK 99501-3120 DATE AMOUNT 09'/2i/98 $I00. NOT VALID AFTER 120 DAYS WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRATION ENGINEERING GEOLOGY COMPANY 6~,p ~'/~:~/~_5",,~' INIT CLASS GEOL AREA 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from ddlling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate we,bore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ........ , ........ 26. BOPE press rating appropriate; test to.,~ c.3 ~ pslg. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. y'~N Y N N Y Y ¥ N Y N Y N Y N Y N ¥ N Y N Y N Y N Y N dev ~'~_ redrll~-~ serv~wellboreseg~ L APPR DATE 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N / 31. Data presented on potential overpressure zones ....... Y N 32. Seismic analysis of shallow gas zones ............. Y 33. Seabed condition survey (if off-shore) ............. 34. Contact name/phone for weekly progress reports [exploratory~ Y N Y N Y N Y N Y N Y N 35. With proper cementing records, th_is plan (A) will contain waste in a suita~receiving zone; (B) will ~;~o~~ter; or cause drilling waste... to sb~--e~, / ~ (C) will ~cal integrity of the w-'ell used for disposal; (D) willD~age producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. ann. disposal para req .~ ON/OFF SHORE ~/'~ GEOLO~;~: ENGINF_.EI~.NG: UlC/A0n~a? JDH-~-----'"-- COMMISSION: DWJ ~ RNC ~' co Comments/Instructions: c:\msoffice\wordian\diana\checklist · WELL PERMIT CHECKLIST COMPANY <:~;) WELl_ NAME ~'~-~"'~/-~2_~ FIELD & POOL ....... _~_._...?__~./(.~D___ ADMINISTRATION . INIT CLASS ,~,Z./' .,2-~::~..,;// GEOL AREA ~:'.~',,~:~ ._ ENGINEERING APPR DA'rE GEOLOGY APPI't [)A~f [:_ .,, ANNUL,AB DISP___~OSAL APPR DATE 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3 Unique well name and number ................. 4 Well located in a defined pool .................. 5 Well located proper distance from drilling unit boundary. . . 6 Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unil ........... 8. If deviated, is wellbore plat included ............... 9. Operator only affected pady ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Corlduclor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMl' vol adequate to circulate on conductor & surf csg ..... '17. CMI vol adequale to tie-in long string to surf csg ........ 18. CM 1' will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill; has a ~10-403 for abandonment been approved. 22. Adequate wellbore separation proposed ............. 23. If diveder required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequale ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to A'-E~,~) psig 27. Choke manifold complies w/APl RP-53~(May §4) ........ 28. Work will occur without operation shutdown ........... 29. "~ N I N '~ N '~ N '~ N t N t N t N t N '~ N '~ N Y Y N d~u PROGRAM: exp [] dev edrl erv [] wellbore seg II ann. disposal para req _ UNIT// ../'.,,'/.~'~"<::::~ ON/OFF SHORE _- Is presence of H2S gas probable ................. <~ N 30. Pern,it can be issued w/o hydrogen sulfide measures ..... Y/~y i///~ ~ ii~".' .ii". iii"'i.' ...i.'".'. i .... '"' ii .. '.~ 31. Data presented on potential overpressure zones ....... 32 Seismic analysis of shallow gas zones. ' ¢ ................... 33 Seabed condition survey (if off-shore) ............. 34 Contact nam, e/phon,e.for weekly progress reports ....... / Y N [exploratory omy] 35. Wilh proper cementing rec~r,,ds, this plan (A) will contain waste in a statable receivin~ ....... Y N (R) will not contaminate fresh~,ter; o..~e drilling wasle... Y N lo surface; (C) wili nol impair mec~te~~4sed_J..q.r disposal; Y N (1")) will not clan'mge.%pr-dSucir~g formation or' impair recovery from a Y N pool; (E) will nof'Cfrcumvent 20 AAC 25.252 or 20 ,A~C 25.412. Y N Comments/Instructions' _G E__0_t.__O__G._Y: ENGINEERING: U I C/AL~"f~ar COMMISSION: JD~ ~ RNC ' - co M chekhsl mv (}5/2919H dlf f: \iH';HIh~ ~\wf)H:linn\,'h;, H ~\, I~ ,, I h, I Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Tue Aug 24 12:50:43 1999 Reel Header Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientif~ic~- Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW-90047 C. ASUCHAK D. ACKERMAN U-02A 500292117001 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 24-AUG-99 MWD RUN 3 AK-MW-90047 C. ASUCHAK D. ACKERMAN MWD RUN 4 AK-MW-90047 C. ASUCPLAK J. BOYD/K.WH JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 10 AK-MW-90047 J. PITCHER K.WHITE MWD RUN 11 AK-MW-90047 J. PITCHER K.WHITE MWD RUN 12 AK-MW-90047 J. PITCHER K.WHITE JOB NUMBER: LOGGING ENGINEER: MWD RUN 13 AK-MW-90047 J. PITCHER OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD K. WHITE 18 11 13E 237 2434 76.50 76.50 47.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 9879.0 PRODUCTION STRING 6.000 13429.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 3. MWD RUN 2 IS DIRECTIONAL ONLY AND NOT PRESENTED. 4. MWD RUN 3 WAS DIRECTIONAL WITH NGP. THIS WELL KICKS OFF FROM U-02 AT 9879' MD, 8803'TVD. 5. MWD RUNS 4,AND 10-13 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . THE CHANGE FROM NGP TO DGR DETECTORS OCCURS AT 10089'MD, 8944'TVD. 6. THIS WELL KICKS OFF FROM U-02A PB1 AT 10260'MD, 8970'TVD. 7. DIGITAL MWD DATA IS SHIFTED TO THE PDC GR LOG OF 09/04/84 (LDT) . 8. MWD RUNS 1-4 AND 10-13 REPRESENT WELL U-02A WITH API#: 50-029-21170-01. THIS WELL REACHED A TOTAL DEPTH OF 13429'MD, 8971'TVD. SROP = SMOOTHED R_ATE OF PENETRATION. SGRD = SMOOTHED GAMMA RAY. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTtLA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9695 0 13401.5 ROP 9730 5 13444.0 FET 10112 5 13408.5 RPD 10112 5 13408.5 RPM 10112 5 13408.5 RPS 10112 5 13408.5 RPX 10112 5 13408.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 9695.0 9705 0 9714 9718 9720 9730 9731 9737 9739 9741 9744 9747 9759 9762 9765 9770 9775 9779 9783 9796 9872 9874 9875 9876 GR 9676 0 9686 0 9697 0 9700 5 9702 5 9715 0 9716 0 9724 0 9726 0 9727 5 9730 5 9735 0 9746 5 9749 5 9752.0 9756 5 9762 0 9767 0 9770 5 9782 0 9857 0 9860 0 9861 0 9863 0 EQUIVALENT %/NSHIFTED DEPTH -- 9879.5 9883.5 9889.0 13444.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD $ REMARKS: 9865.5 9869.0 9874.0 13429.0 BIT RUN NO MERGE TOP 1 3 4 10 11 12 13 9715 0 9901 0 10152 0 10260 0 11809 0 11939 0 13151 0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 9901 0 10152 0 10260 0 11809 0 11939 0 13151 0 13429 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT~H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Name Min Max Mean Nsam Reading DEPT 9695 13444 11569.5 7499 9695 ROP 0.0661 2334.38 94.5347 7428 9730.5 GR 17.3708 874.69 53.4296 7414 9695 RPX 0.724 2000 7.30027 6593 10112.5 RPS 0.6974 28.1899 6.40052 6593 10112.5 RPM 0.404 38.1908 6.63167 6593 10112.5 RPD 1.3371 2000 7.59301 6593 10112.5 FET 0.224 78.0788 2.49812 6593 10112.5 Last Reading 13444 13444 13401 5 13408 5 13408 5 13408 5 13408 5 13408 5 First Reading For Entire File .......... 9695 Last Reading For Entire File ........... 13444 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9676.0 9889.0 ROP 9715.0 9901.0 $ LOG HEADER DATA DATE LOGGED: 26-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 9901.0 TOP LOG INTERVAL (FT) : 9715.0 BOTTOM LOG INTERVAL (FT) : 9901.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE TOOL NUMBER NGP SPC 46 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPER_ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 MILLING FLUID 8.80 87.0 9.2 27000 8.6 .000 .000 .000 .000 27.3 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam .Reading DEPT 9676 9901 9788.5 451 9676 GR 32.4232 212.648 67.1331 427 9676 ROP 2.304 929.883 54.455 373 9715 Last Reading 9901 9889 9901 First Reading For Entire File .......... 9676 Last Reading For Entire File ........... 9901 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE N-UMBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9889.5 10089.0 ROP 9901.5 10152.0 $ LOG HEADER DATA DATE LOGGED: 28-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 10152.0 TOP LOG INTERVAL (FT) : 9904.0 BOTTOM LOG INTERVAL (FT) : 10152.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 30.8 MA~XIMUM ANGLE: 70.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE TOOL NUMBER NGP SPC 278 BOREHOLE Ai~D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT M_AX CIRCULATING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL ST~NDOFF (IN) : EWR FREQUENCY (HZ): REM3LRKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down~ Optical log depth units..~ ......... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 KCL POLYMER 8.70 48.0 8.5 29000 8.8 .000 .000 .000 .000 56.3 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9889.5 10152 10020.8 526 9889.5 GR 35.3863 874.69 166.088 400 9889.5 ROP 0.0661 374.484 86.3299 502 9901.5 Last Reading 10152 10089 10152 First Reading For Entire File .......... 9889.5 Last Reading For Entire File ........... 10152 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10089 5 10097 5 10097 5 10097 5 10097 5 10097 5 10152 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: STOP DEPTH 10260 0 10260 0 10260 0 10260 0 10260 0 10260 0 10260 0 30-DEC-98 ISC 5.07 DEPII 2.22A, SP4 ~EMORY 10260.0 10152.0 10260.0 82.0 MAXIMUM ANGLE: 100.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REFLARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NLIMBER Pll03GR4 Pll03GR4 6.000 6.0 QUICKDRILL 8.90 56.0 9.0 32000 6.0 .180 .086 .200 .120 72.7 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD 4 HOUR 4 1 68 4 2 RPD MWD 4 OHMM 4 1 68 8 3 RPM MWD 4 OHMM 4 1 68 12 4 RPS MWD 4 OHMM 4 1 68 16 5 RPX MWD 4 OHMM 4 1 68 20 6 GR MWD 4 API 4 1 68 24 7 ROP MWD 4 FT/H 4 1 68 28 8 Name Min DEPT 10089.5 FET 0.5369 RPD 4.2216 RPM 3.872 RPS 3.8131 RPX 3.3187 GR 18.9368 ROP 20.8825 Max 10260 18 2607 6 9221 7 0036 7 2609 6 4667 56 1132 1030.08 Mean Nsam 10174.8 342 6.53254 326 5.69678 326 5.48455 326 5.30984 326 4.67942 326 32.1718 342 118.744 216 First Reading 10089.5 10097.5 10097.5 10097.5 10097.5 10097.5 10089.5 10152.5 Last Reading 10260 10260 10260 10260 10260 10260 10260 10260 First Reading For Entire File .......... 10089.5 Last Reading For Entire File ........... 10260 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 R3IW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR 10 .5000 START DEPTH 10260 5 10260 5 10260 5 10260 5 10260 5 10260 5 STOP DEPTH 11776.0 11776.0 11776.0 11776.0 11776.0 11769.0 ROP 10260.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 11809.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 25-JAN-99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 11809.0 10260.0 11809.0 81.4 97.7 TOOL NUMBER P1043GR4 P1043GR4 6.000 6.0 FLOPRO 8.60 43.0 8.7 30000 7.5 · 195 .088 .140 .200 72.7 .6 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 10 FT/H 4 1 68 4 2 GR MWD 10 API 4 1 68 8 3 RPX MWD 10 OHMM 4 1 68 12 4 RPS MWD 10 OHMM 4 1 68 16 5 RPM MWD 10 OHMM 4 1 68 20 6 RPD MWD 10 OHMM 4 1 68 24 7 FET MWD 10 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Min 10260.5 5 4466 17 3708 1 4988 1 6122 1 7671 2 3229 0.224 Max Mean Nsam 11809 11034.8 3098 1619.16 90.9495 3098 141.786 39.1283 3018 15.3732 5.15955 3032 17.3827 5.75752 3032 18.2917 5.82902 3032 18.0745 6.15952 3032 78.0788 0.941982 3032 First Reading 10260 5 10260 5 10260 5 10260 5 10260 5 10260 5 10260 5 10260 5 Last Reading 11809 11809 11769 11776 11776 11776 11776 11776 First Reading For Entire File .......... 10260.5 Last Reading For Entire File ........... 11809 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files· BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11769 5 11776 5 11776 5 11776 5 11776 5 11776 5 11809 5 SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11892.0 11899.0 11899.0 11899.0 11899.0 11899.0 11939.0 27-JA_N- 99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 11939.0 11809.0 11939.0 89·9 91.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P1043GR4 P1043GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 8.60 43.0 8.7 30000 7.5 · 195 .090 ·140 .200 70.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 11 FT/H 4 1 68 4 2 GR MWD 11 API 4 1 68 8 3 FET MWD 11 HOUR 4 1 68 12 4 RPX MWD 11 OHMM 4 1 68 16 5 RPS MWD 11 OHMM 4 1 68 20 6 RPM MWD 11 OHMM 4 1 68 24 7 RPD MWD 11 OHMM 4 1 68 28 8 Name DEPT ROP GR FET RPX RPS RPM RPD Min 11769.5 2 6568 31 4441 1 2236 3 0306 3 7205 3 9138 4 1806 Max 11939 304.102 51 1942 31 6273 5 9471 6 7973 6 7305 6 8245 Mean Nsam 11854.2 340 59.2991 260 39.8251 246 10.4733 246 4.33569 246 4.95222 246 5.13936 246 5.46633 246 First Reading 11769 5 11809 5 11769 5 11776 5 11776 5 11776 5 11776 5 11776 5 Last Reading 11939 11939 11892 11899 11899 11899 11899 11899 First Reading For Entire File .......... 11769.5 Last Reading For Entire File ........... 11939 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NLTMBER: 7 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11892.5 FET 11899 5 RPD 11899 5 RPM 11899 5 RPS 11899 5 RPX 11899 5 ROP 11939 5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA STOP DEPTH 13111.0 13118.0 13118.0 13118.0 13118.0 13118.0 13151.0 30-JAN-99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 13151.0 11939.0 13151.0 84.0 93.5 TOOL NUMBER P1043GR4 P1043GR4 OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical lo9 depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 FLOPRO 8.90 58.0 8.5 5.8 .130 .052 .150 .110 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 12 FT/H 4 1 68 4 2 GR MWD 12 API 4 1 68 8 3 RPX MWD 12 OHMM 4 1 68 12 4 RPS MWD 12 OHMM 4 1 68 16 5 RPM MWD 12 OHMM 4 1 68 20 6 RPD MWD 12 OHMM 4 1 68 24 7 FET MWD 12 HOUR 4 1 68 28 8 77.3 First Name Min Max Mean Nsam Reading DEPT 11892.5 13151 12521.8 2518 11892.5 ROP 7.3814 2257.36 99.42 2424 11939.5 GR 27.3755 562.846 57.2841 2438 11892.5 RPX 0.724 2000 10.8819 2438 11899.5 Last Reading 13151 13151 13111 13118 RPS 0.6974 28.1899 7.37931 2438 RPM 0.404 38.1908 7.88728 2438 RPD 1.3371 2000 9.98342 2438 FET 0.3716 41.6954 2.13328 2438 11899.5 11899.5 11899.5 11899.5 13118 13118 13118 13118 First Reading For Entire File .......... 11892.5 Last Reading For Entire File ........... 13151 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13111 5 13386.5 FET 13118 5 13393.5 RPD 13118 5 13393.5 RPM 13118 5 13393.5 RPS 13118 5 13393.5 RPX 13118 5 13393.5 ROP 13151 5 13429.0 $ LOG HEADER DATA DATE LOGGED: 01-FEB-99 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 13429.0 13150.0 13429.0 83.7 84.5 TOOL NUMBER P1043GR4 P1043GR4 6.000 6.0 FLOPRO 8.60 39.0 8.5 19000 6.0 .200 .098 .320 .220 65.6 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 13 GR MWD 13 FET MWD 13 RPX MWD 13 RPS MWD 13 RPM MWD 13 RPD MWD 13 FT/H 4 1 68 API 4 1 68 HOUR 4 1 68 OHMM 4 1 68 OHMM 4 1 68 OHMM 4 1 68 OHMM 4 1 68 4 8 12 16 20 24 28 Name DEPT ROP GR FET RPX RPS RPM RPD Min 13111.5 25 3799 18 0879 0 4582 2 7384 2 9358 2 9082 3 0007 Max Mean Nsam 13429 13270.2 636 2334.38 134.416 556 95.0376 41.4448 551 41.6334 6.7279 551 12.3082 6.10677 551 24.9596 6.89986 551 26.647 6.83762 551 19.794 6.97562 551 First Reading 13111 5 13151 5 13111 5 13118 5 13118 5 13118 5 13118 5 13118 5 Last Reading 13429 13429 13386 5 13393 5 13393 5 13393 5 13393 5 13393 5 First Reading For Entire File .......... 13111.5 Last Reading For Entire File ........... 13429 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Aug 24 11:59:01 1999 Reel Header Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW- 90047 C. ASUCHAK D. ACKERMAN U-02A PB1 500292117070 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 24-AUG-99 MWD RUN 3 AK-MW- 90047 C. ASUCHAK D. ACKERMA/~ MWD RUN 4 AK-MW-90047 C. ASUCHAK J. BOYD/K.WH JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 AK-MW-90047 C. ASUCHAK J. BOYD/K.WH MWD RUN 6 AK-MW- 90047 C. ASUCHAK J. BOYD/K.WH MWD RUN 7 AK-MW-90047 C. ASUCHAK G. KIDD JOB NUMBER: LOGGING ENGINEER: MWD RUN 8 AK-MW-90047 C. ASUCHAK OPERATOR WITNESS: G. KIDD SURFACE LOCATION SECTION: 18 TOWNSHIP: 11 RANGE: 13E FNL: FSL: 237 FEL: 2434 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: 76.50 DERRICK FLOOR: 76.50 GROUND LEVEL: 47.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 9879.0 PRODUCTION STRING 6.000 15628.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. THIS WELL KICKS OF FROM U-02 AT 9879'MD, 8803'TVD. 3. MWD RUN 1 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 4. MWD RUN 2 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 5. MWD RUN 3 IS DIRECTIONAL WITH NGP. 6. MWD RUNS 4-8 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) . THE CHANGE FROM NGP TO DGR DETECTORS OCCURS AT 10089'MD, 8944'TVD. 7. GAMMA RAY DATA ENDS AT 15399'MD, 9004'TVD DUE TO TOOL FAILURE. 8. DIGITAL MWD DATA IS DEPTH SHIFTED TO THE LDT-GR PDC LOG OF 09/04/84. 9. MWD RUNS 1 THRU 8 REPRESENT U-02A DB1 WITH API#: 50-029-21170-01. THIS WELL REACHED A TOTAL DEPTH OF 15628'MD, 9025'TVD. SROP = SMOOTHED RATE OF PENETRATION. SGRD = SMOOTHED GAMMA RAY. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME RESISTIVITY SENSOR. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9695 0 15413.5 ROP 9730 5 15641.5 FET 10112 5 15547.5 RPD 10112 5 15547.5 RPM 10112 5 15547.5 RPS 10112 5 15547.5 RPX 10112 5 15547.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 9695.0 9705.0 9714.0 9718.5 9720 5 9730 5 9731 5 9737 5 9739 5 9741 5 9744 5 9747 5 9759 5 9765.5 9770 0 9775 0 9779 5 9782 0 9783 0 9796 0 9872 0 9874 0 9875 0 9876 5 GR 9676 0 9686 0 9697 0 9700 5 9702 5 9715 0 9716 0 9724.0 9726.0 9727.5 9730.5 9735.0 9746.5 9752.0 9756.5 9762.0 9767.0 9769.5 9770 5 9782 0 9857 0 9860 0 9861 0 9863 0 EQUIVALENT UNSHIFTED DEPTH 9879.5 9865.5 9883.5 9869.0 9889.0 9874.0 9892.5 9877.5 15641.5 15626.5 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 3 MWD 4 MWD 5 MWD 6 MWD 7 MWD 8 $ REMARKS: MERGED MAIN PASS. $ MERGE TOP 9715.0 9901.0 10152.0 11491.0 12541.0 13991.0 15385.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 9901 0 10152 0 11491 0 12541 0 13991 0 15385 0 15568 0 Name Service Order Units Size Nsam DEPT FT 4 1 ROP MWD FT/H 4 1 GR MWD API 4 1 RPX MWD OHMM 4 1 RPS MWD OHMM 4 1 RPM MWD OHMM 4 1 RPD MWD OHMM 4 1 FET MWD HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 9695 15641.5 12668.2 ROP 0.0661 2506.64 107.411 GR 15.054 874.69 44.6001 RPX 0.384 217.171 7.10409 RPS 0.405 93.8393 8.6243 RPM 0.3771 2000 9.44867 RPD 0.4508 2000 11.5483 FET 0.2064 35.0189 1.69716 First Last Nsam Reading Reading 11894 9695 15641.5 11823 9730.5 15641.5 11438 9695 15413.5 10871 10112.5 15547.5 10871 10112.5 15547.5 10871 10112.5 15547.5 10871 10112.5 15547.5 10871 10112.5 15547.5 First Reading For Entire File .......... 9695 Last Reading For Entire File ........... 15641.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE N-UMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMFLARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9676.0 9889.0 ROP 9715.0 9901.0 $ LOG HEADER DATA DATE LOGGED: 26-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWN-HOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 9901.0 TOP LOG INTERVAL (FT) : 9715.0 BOTTOM LOG INTERVAL (FT) : 9901.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP $ NATLULm_L GAMMA PROBE BOREHOLE AlqD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/qDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 NGP SPC 46 6.000 6.0 MILLING FLUID 8.80 87.0 9.2 27000 8.6 .000 .000 .000 .000 27.3 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 1 FT/H 4 1 68 4 2 GR MWD 1 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9676 9901 9788.5 451 9676 ROP 2.304 929.883 54.455 373 9715 GR 32.4232 212.648 67.1331 427 9676 Last Reading 9901 9901 9889 First Reading For Entire File .......... 9676 Last Reading For Entire File ........... 9901 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NLIMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9889.5 10089.0 ROP 9901.5 10152.0 $ LOG HEADER DATA DATE LOGGED: 28-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWN-HOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 10152.0 TOP LOG INTERVAL (FT) : 9904.0 BOTTOM LOG INTERVAL (FT) : 10152.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 30.8 MAXIMUM ANGLE: 70.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP $ NATURAL GAMMA PROBE BOREHOLE ~ CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units; ...................... Datum Specification Block sub-type...0 NGP SPC 278 6.000 6.0 KCL POLYMER 8.7O 48.0 8.5 29000 8.8 .000 .000 .000 .000 56.3 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR MWD 3 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9889.5 10152 10020.8 526 9889.5 ROP 0.0661 374.484 86.3299 502 9901.5 GR 35.3863 874.69 166.088 400 9889.5 Last Reading 10152 10152 10089 First Reading For Entire File .......... 9889.5 Last Reading For Entire File ........... 10152 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in. separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10089.5 11448.0 FET 10097.5 11455.0 RPD 10097.5 11455.0 RPM 10097.5 11455.0 RPS 10097.5 11455.0 RPX 10097.5 11455.0 ROP 10152.5 11491.0 $ LOG HEADER DATA DATE LOGGED: 30-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 11491.2 TOP LOG INTERVAL (FT) : 10152 . 0 BOTTOM LOG INTERVAL (FT) : 11491.2 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MIlD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 82.0 100.4 TOOL NI/MBER Pll03GR4 Pll03GR4 6.000 6.0 QUICKDRILL 8.90 56.0 9.0 32000 6.0 .180 .086 .200 .120 72.7 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 4 FT/H 4 1 68 4 2 GR MWD 4 API 4 1 68 8 3 RPX MWD 4 0HMM 4 1 68 12 4 RPS MWD 4 OHMM 4 1 68 16 5 RPM MWD 4 OHMM 4 1 68 20 6 RPD MWD 4 OHMM 4 1 68 24 7 FET MWD 4 HOUR 4 1 68 28 Name Min Max Mean Nsam DEPT 10089.5 11491 10790.2 2804 ROP 6.6435 1601.63 116.825 2678 GR 16.061 137.415 39.5471 2718 RPX 0.384 13.7774 5.48568 2716 RPS 0.405 15.0671 6.0356 2716 RPM 0.3771 13.6442 6.03226 2716 RPD 0.4508 12.1228 6.16848 2716 FET 0.2071 18.2607 1.4496 2716 First Reading 10089 5 10152 5 10089 5 10097 5 10097 5 10097 5 10097 5 10097 5 Last Reading 11491 11491 11448 11455 11455 11455 11455 11455 First Reading For Entire File .......... 10089.5 Last Reading For Entire File ........... 11491 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name .......... iSTSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11448.5 FET 11455.5 RPD 11455.5 RPM 11455.5 RPS 11455.5 STOP DEPTH 12498.0 12505.0 12505.0 12505.0 12505.0 RPX 11455.5 ROP 11491.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 12505.0 12541.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AATD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MLTD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down 01-JAN-99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 12541.0 11491.0 12541.0 79.9 96.1 TOOL NLTMBER Pll03GR4 Pll03GR4 6.000 6.0 QUICKDRILL 8.90 56.0 9.0 32000 6.0 .220 .087 · 160 .150 75.0 .6 Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 DEPT ROP GR RPX RPS RPM RPD FET Name Service Order Units Size Nsam FT 4 1 MWD 5 FT/H 4 1 MWD 5 API 4 1 MWD 5 OHMM 4 1 MWD 5 OHMM 4 1 MWD 5 OHMM 4 1 MWD 5 OHMM 4 1 MWD 5 HOUR 4 I Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 11448.5 12541 11994.8 ROP 6.4914 913.456 103.942 GR 15.8573 133.018 39.7743 RPX 0.8121 14.0931 6.58387 RPS 0.7973 14.9947 7.38917 RPM 0.8251 15.6272 7.3705 RPD 0.6931 94.7451 7.61924 FET 0.255 20.5547 1.46198 First Last Nsam Reading Reading 2186 11448.5 12541 2100 '11491.5 12541 2100 11448.5 12498 2100 11455.5 12505 2100 11455.5 12505 2100 11455.5 12505 2100 11455.5 12505 2100 11455.5 12505 First Reading For Entire File .......... 11448.5 Last Reading For Entire File ........... 12541 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 12498 5 12505 5 12505 5 12505 5 12505 5 12505 5 12541 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: STOP DEPTH 13958 0 13960 0 13960 0 13960 0 13960 0 13960 0 13991 0 04 -JAN- 99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 13991.0 12541.0 13991.0 80.0 99.0 TOOL NUMBER Pl103GR4 Pll03GR4 6.000 6.0 QUICK]DRILL 9.00 51.0 8.5 32000 6.2 .110 .056 .240 .300 84.4 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 6 FT/H 4 1 68 4 2 GR MWD 6 API 4 1 68 8 3 RPX MWD 6 OHMM 4 1 68 12 4 RPS MWD 6 OHMM 4 1 68 16 5 RPM MWD 6 OHMM 4 1 68 20 6 RPD MWD 6 OHMM 4 1 68 24 7 FET MWD 6 HOUR 4 1 68 28 8 Name Min Max Mean Nsam DEPT 12498.5 13991 13244.8 2986 ROP 5.6352 2506.64 138.774 2900 GR 15.054 142.325 38.5185 2920 RPX 1.7558 217.171 7.46308 2910 RPS 2.0352 93.8393 8.9687 2910 RPM 2.0398 90.909 9.6401 2910 RPD 2.5631 2000 15.8585 2910 FET 0.2064 25.06 1.35559 2910 First Reading 12498 5 12541 5 12498 5 12505 5 12505 5 12505 5 12505 5 12505 5 Last Reading 13991 13991 13958 13960 13960 13960 13960 13960 First Reading For Entire File .......... 12498.5 Last Reading For Entire File ........... 13991 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEAJDER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 13958 5 13960 5 13960 5 13960 5 13960 5 13960 5 13991 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 15343.0 15350.0 15350.0 15350.0 15350.0 15350.0 15385.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ 07-JAN-99 ISC 5.07 DEPII 2.22A, SP4 MEMORY 15385.0 13991.0 15385.0 82.9 97.1 TOOL N-UMBER Pl168GR4 Pl168GR4 BOREHOLE ~2W-D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Lo99in9 Direction ................. Down Optical lo9 depth units ........... Feet Data Reference Point .............. Undefined Frame Spacin9 ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUICK/DRILL 8.70 46.0 8.0 6.0 .170 .084 .400 .150 .6 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD 7 FT/H 4 1 68 GR MWD 7 API 4 1 68 RPX MWD 7 OHMM 4 1 68 RPS MWD 7 OHMM 4 1 68 RPM MWD 7 OHMM 4 1 68 RPD MWD 7 OHMM 4 1 68 FET MWD 7 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 88.9 Name Min Max Mean DEPT 13958.5 15385 14671.8 ROP 6.0811 1646.19 80.3854 GR 18.2978 182.208 39.1175 First Last Nsam Readin9 Readin9 2854 13958.5 15385 2788 13991.5 15385 2770 13958.5 15343 RPX 0.4406 21.0969 8.80972 2780 RPS 0.4709 53.9158 11.7729 2780 RPM 0.4597 2000 14.1834 2780 RPD 0.6701 2000 15.4467 2780 FET 0.3507 35.0189 1.81306 2780 13960.5 13960.5 13960.5 13960.5 13960.5 15350 15350 15350 15350 15350 First Reading For Entire File .......... 13958.5 Last Reading For Entire File ........... 15385 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 15343 5 15398.5 FET 15350 5 15532.5 RPD 15350 5 15532.5 RPM 15350 5 15532.5 RPS 15350 5 15532.5 RPX 15350 5 15532.5 ROP 15385 5 15568.0 $ LOG HEADER DATA DATE LOGGED: 09-JAN-99 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MI/D AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 15568.0 15385.0 15568.0 83.9 85.4 TOOL NUMBER Pl168GR4 Pl168GR4 6.000 6.0 QUICKDRILL 8.70 54.0 8.5 30000 7.0 .170 .084 .400 .150 91.1 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 ROP MWD 8 FT/H 4 1 68 GR MWD 8 API 4 1 68 RPX MWD 8 OHMM 4 1 68 RPS MWD 8 OHMM 4 1 68 RPM MWD 8 OHMM 4 1 68 RPD MWD 8 OHMM 4 1 68 FET MWD 8 HOUR 4 1 68 0 4 8 12 16 20 24 28 Name Min Max Mean Nsam DEPT 15343.5 15568 15455.8 450 ROP 7.7565 1648.09 102.608 366 GR 22.2459 56.3658 31.9627 111 RPX 2.7567 11.3462 6.28695 365 RPS 3.9361 13.9533 8.26661 365 RPM 5.6614 13.8855 9.23959 365 RPD 7.507 13.0967 10.13 365 FET 0.5645 30.473 6.73285 365 First Reading 15343.5 15385.5 15343.5 15350.5 15350.5 15350.5 15350.5 15350.5 Last Reading 15568 15568 15398 5 15532 5 15532 5 15532 5 15532 5 15532 5 First Reading For Entire File .......... 15343.5 Last Reading For Entire File ........... 15568 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/08/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Scientific Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File