Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-012Image ~ject Well History File C~r Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - ~ ~ ~ Well History File Identifier O anizin (done) ^ Two-sided III II'llllllll IIII r9- 9 RESCAN DIGITAL DATA Color Items: iskettes, No. ' ~reyscale Items: ~ ~~ ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: NOTES: BY: Maria Project Proofing BY: Maria Date:. ~ / Date: ~ ~ '~ Scanning Preparation _.~ x 30 = BY: Maria ~ Date: Production Scanning ^ Rescan Needed II I IIII II II ~ I II I III OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ P mimiiimmu d ~~ + =TOTAL PAGES (Count does not include cover sheet) /s/ Stage 1 Page Count from Scanned File: ~~ ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ES NO BY: ~ Maria Date: ~~ ~ ~~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s~ Scannin is complete at this point unless rescanning is required. II I II II II I II II I I III 9 Rescanned III IIIIIIIIIII IIIII BY: Maria Date: /s~ Comments about this file: Quality Checked II I II'III III II II III 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 Mr. Jim Regg SiANNED Alaska Oil and Gas Conservation Commission AUG 2012 333 West 7 Avenue 0207-01(D" Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 �� E q/ Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Litt ej4- " :7) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 1020 6/22/2009 P2 -04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2 -08A 2061690 50029228960100 0.8 • NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 1020 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 L P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 22 NA 22 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -336 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2-43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2-47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 _ 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 ~~ ~~ ~,. '` u~ ~, ~ ice'. ~. ~ :~ ~,. <; '~ ~, ~~~ '~ ~,. MICROFILMED. 6/30/2010. DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~ ~~ ~ ~ DATA SUBMITTAL COMPLIANCE REPORT 5/7/2009 Permit to Drill 2070120 Well Name/No. PRUDHOE BAY UN PTM P2-19A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22765-01-00 MD 16236 TVD 9075 Completion Date 4/24/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD DIR / GR / RES, CNL / GR /CCL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D Asc Directional Survey 14450 16236 Open 5/3/2007 R~t Directional Survey 14450 16236 Open 5/3/2007 Log Production 5 Blu 1 14980 16062 Open 6/20/2007 Mem PPL, GR, CCL, Temp, Pres, Spin 6-Jun- ', 2007 ~ rED C Las 15231 ee Notes 14705 15910 Case. 6/20/2007 Coil Flag, LAPD, Gam, CCL j~D ~ 15514 Induction/Resistivity 14430 16236 Open 10/3/2007 LAS ... GR, ROP RPD ~~g 15514 Induction/Resistivity 25 Blu 14477 16236 Open 10/3/2007 MD Multi Prop Res, GR 20- Apr-2007 ~g 15514 Induction/Resistivity 25 Blu 14477 16236 Open 10/3/2007 TVD Multi Prop Res, GR I 20-Apr-2007 If.Cog 15514 Gamma Ray 25 Blu 14477 16236 Open 10/3/2007 GR 20-Apr-2007 ~D C Lis 15572 Neutron 13811 16022 Case 10/26/2007 LIS Veri, GR, CNT w/PDS / graphics ~ ~6g Neutron 2 Blu 1 14100 16020 Open 10/26/2007 MCNL, GR, CCL, CNL 22- Apr-2007 Well Cores/Samples Information: S ample Interval Set Name Start Stop Sent Received N umber Comments DATA SUBMITTAL COMPLIANCE REPORT 5/7/2009 Permit to Drill 2070120 Well Name/No. PRUDHOE BAY UN PTM P2-19A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22765-01-00 MD 16236 ND 9075 Completion Date 4/24/2007 Completion Status 1-OIL Current Status 1-OIL UIC N ADDITIONAL INFORMATION ((~~,,~ Well Cored? Y 1~ Daily History Received? "(''~/ ,N~ Chips Received? Y7"I~" Formation Tops i5""" Analysis Y Received? r~ L_J ~~ 11 105/07 Schlumberr~r NO. 4360 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Niakuk, Milne Pt., Pt. Mac, Prince C Wnll .Inh $ Inn naerrintinn Hato RI (:nlnr rn 5-400A 11855508 USIT (REVISED) ~ 09/18/07 1 C-30 11695080 LDL 10/16/07 1 Z-22B 11594525 SBHP SURVEY 10/06/07 1 14-31 11890316 LDL 10/18/07 1 NK-22A 11855822 DRIFT TDILDL (- 10/25/07 1 • MPG-07 N/A CORRELATIONIDDL ~ 09/08/07 1 MPG-07 11628799 MEM INJ PROFILE C - - 10/20107 1 MPF-10 11767140 MEM INJ PROFILE U= - 09/15/07 1 MPS-05 11745237 MEM PPROF SUPPLEMENT LOG -' 3'~-- 10/09/07 1 P2-19A 11649963 _ MCNL ~ .- Ul - 04/22/07 1 1 OWDW-SW 11221548 RST ~. 03/05/06 1 1 W-17A 11588701 MCNL ._ ~ '¢ 12/26/06 1 1 14-30A 11485775 MCNL --(S (p0 11/22/06 1 1 L-51 40013624 OH MWD/LWD EDIT 06/26/06 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. ~ ~;i Petrotechnical Data Center LR2-1 li 900 E. Benson Blvd. Anchora e, Alaska 99508 Date Delivered: n^ r ;~a~i~lt'I~ ~#~ i€'I Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received by: ~Y 10/23/07 3chfumberger NO. 4459 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 40o Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Aurora, Milma Pt.,Lisburnl Wnll _In6 it Inn Deccrintinn Data RI. Color CD F-48 11846815 USIT / 10/12!07 1 G-19A 11890315 USIT j .- L 09/30/07 1 NGI-13 11890313 USIT ~ 09130107 1 MPE-30A 11855817 USIT c7U~ '-(~ 1 _ 10/01/07 1 F-116 11649954 MCNL (~-(- !~~/ -k 5~ 03/22107 1 1 W-12A 11418301 MCNL ) ~ '~ G 09/10/06 1 1 11-27 11637127 RST - j ~ ~ 06105/07 1 1 02-22A 11216214 MCNL ¢ 10/02/06 1 1 01-16 11630486 RST ~ v t 06128/07 1 1 01-14 11801086 RST ~ I 07/07/07 1 1 L5-05 11767129 MCNL / _ ~ j~ 06117/07 1 1 D-21 11626119 RST ! - "F 09/12/07 1 1 14-15 11221550 RST ~ - (~ ~ ~ 03107!06 1 1 D-18A 11695074 RST '~ 08/28107 1 1 14-05A 11813055 _ RST - '~ ~ 06/11/07 1 1-2310-15 11846802 RST 'f c = I 08111107 1 S-03 11223120 RST ~ ~/ 06/13106 1 1-09AIL-21 11849930 RST ~' '~ S 08/04/07 1 1 P2-19A 11649963 MCNL ~ - ! ~ j ~`J~ a 04122107 1 1 OWDW-NW 11211370 RST ~ j 02/28106 1 1 K-01 11695073 RST - j ~~~}~ 08/27/07 1 1 11-32 11630498 RST j j~ j~ 09103107 1 1 3-2561E-27 11630490 RST '~ 07/26/07 1 1 PLtASt AI:KNUWLtUGt KtGt1Y 1 tST JIr.9NING AIVU Kt 1 UKNINh UIVt I.UY~ tAI;M 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 i ~V a i Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: • Transmittal Form INTEQ To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: P2-19A L ~~ munm r ~ ~ w -- : ~~ BAKER HUGHES Anchorage GEOScience Center - - -- i i Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 blueline - GR Directional Measured Depth Log 1 blueline - MPR/Directional TVD Log 1 blueline - MPR/Directional Measured Depth Log ~~~-~~a ~~5s-~~~ LAC Job#: 1406851 Sent By: Deepa Joglekar Received By: Date: Oct.OZ, 2007..., Date: ~~ ., _~.. - x ---- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RET~IRNING OR FAXING YOUR COPY FAX: (907j X67-6b2s ~''., Baker Hughes INTEQ 7260 Homer Drive ' ~ Anchorage, Alaska - 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 STATE OF ALASKA ~-~ RECEIVED t/p' ALASKA OIL AND GAS CONSERVATION COMMISSION MAY 2 ~ 2007 WELL COMPLETION OR RECOMPLETION REPORT AND L~A(aska Dil & Gas Cons. Commission Anchorage 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAaczs.,os zoAaczs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other f Completions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Dat Comp Susp., or Aba 4/24/2007 12. Permit to Drill Number 207-012 ' 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded ~' 4/16/2007 ~ 13. API Number 50-029-22765-01-00 ' 4a. Location of Well (Governmental Section): Surface: r 4' FN S 7. Date T.D. Reached 4/20/2007 ' 14. Well Name and Number: PBU P2.19A ' 4 L, 1226 FWL, EC. 14, T12N, R14E, UM Top of Productive Horizon: 2349' FNL, 2249' FWL, SEC. 01, T12N, R14E, UM " 8. KB (ft above MSL): 46.50' , Ground (ft MSL): 15. Field /Pool(s): Prudhoe Bay Field /Point Total Depth: 635' FNL, 2266' FWL, SEC. 01, T12N, R14E, UM - 9. Plug Back Depth (MD+TVD) 16111 9071 McIntyre Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 681462 y- 5998537 Zone- ASP4 10. Total Depth (MD+TVD) 16236 9075 16. Property Designation: ADL 365548 TPI: x- 687553 y_ 6006945 Zone- ASP4 Total Depth: x- 687526 y- 6008659 Zone- ASP4 11. SSSV Depth (MD+TVD) None None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD D!R / GR ! RES, CNL / GR / CCL ~/j~/Qow ~ /~~6-f~ i~~ Q~~ ~TYG~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH M0 `SETTING DEPTH TVD, HOLE AMOUNT WT. PER FL-, GRADE TOP BOTTOM TOP BOTTOM .SIZE- CEMENTING RECORD PULLED 20" 133# H-40 Surface 110' Surface 110' 30" Driven 9-5/8" 40# L-80 34' 6984' 34' 4958' 12-1/4" 1783 sx Coldset III 590 sx Class'G' 7" 26# / 2 L-80 / 13Cr80 31' 31' 9017' 8-1 /2" 460 sx Class ' ' ~-vz^ X 33/,6" X z-~ia° s.~ i s.za i s.,su L-80 14298' 16145' 891 T 9071' 4-1 /8" 111 sx Class 'G' 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, IISt each i (MD+TVD of Top & Bottom; Pe nterval Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 2"Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr80 14340' 14293' MD TVD MD TVD 15090' - 15370' 9053' - 9041' 15400' - 15760' 9040' - 9051' 25. ACID, FRACTURE, CEMENT .SQUEEZE, ETC. 15810' - 16030' 9056' - 9068' DEPTH INTERVAL MO AMOUNT H~ KIND OF MATERIAL USED 5000' Freeze Protect wl Diesel 26. PRODUCTION TEST Date First Production: May 18, 2007 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Tesf: 5/18/2007 Hours Tested: 4 PRODUCTION FoR TEST PERIOD OIL-BBL: 3 GAS-MCF: 19 WATER-BBL: 757 CHOKE SIZE: 110 GAS-OIL RATIO: 6,353 Flow Tubing Press. 770 Casing Press: 2,096 CALCULATeD 24-HOUR RATE• OIL-BBL: 18 GAS-MCF: 112 WATER-BBL: 4,543 OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. ~~ ~QY td0~1PzETiON None 3 12DD7 ~~ tf: ~ ~ ~~~~~ Form 10-407 Revised 02/2007 ~ {"~ ~ /~ I ~~ n ~ONTINUED ON REVERSE .SIDE 28.~ GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top N/A N/A If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base N/A N/A detailed test information per 20 AAC 25.071. HRZ 14328' 8936' None Kuparuk 14423' 8994' UC1 14423' 8994' UB4 14502' 9041' UB3 14535' 9058' U B 1-2 14587' 9076' U61-2 14810' 9081' UB3 14987' 9062' UB4 15050' 9057' UB4 15831' 9058' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hu a Title Technical Assistant Date ~? ~ _~ PBU P2-19A `C-~xr'Q,~-k..~0~f-012 Prepared ByName/Number. TenieHubble, 564-4628 Well Number Permit No. / A royal No. Dolling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GerrertA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a Weil producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. (rear 29: Provide a fisting of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 0212007 Submit Original Only TREE= 4-1;16"5M CHROME WELLHEAD = FMC ACTUATOR = BAKER C KB. ELEV - 47.6' BF. ELEV = KOP = 1381' Max Angle = 98 @ 14755' Datum MD = 14203' Datum TV D = 8800' SS CTD Sidetrack ~.. FT 9-5/8" CSG, 40#, L-80, iD = 8.835" I~ 6982' Minimum 1D = 2.37`" a~ 14,896' X© TO 2.875" STL LINER 7" CSG, 26#, L-80, ID = 6.276" I-I 13530' TOP OF 3-3116" LNR ~-~ 1429$' ~ Top of Cement 14298° 3.5" X Nip 2.813" (D 14317' NOTES: 7" CHROME CSG & 4-112" CHROME TBG 14293' I~ 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 14316' I-I 4-1/2" OTIS X NIP, ID = 3.813" 14327' I~ 4-1/2" OTIS XN NIP, ID = 3.H" ~ 4-1/2" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" I PERFORATION SUMMARY REF LOG: SWS MCNL i GR / CCL OF 04!13/07 ANGLE AT TOP PERF: 96 @ 15090' Note: Refer to FYoduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2 6 15090 - 15370 O 04/23(07 2 6 15400 - 15760 O 04/23/07 2 6 15810 - 16030 O 04/23/07 PBTD I-I 14675' 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.184" ~-) 14716' I 4-1/2" CAMCO BAL-O SVLN, ID = 3.812" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 5247 3996 59 KBG-2-LS DMY INT 0 12/07!06 2 8022 5501 59 KBG-2-LS DMY INT 0 3 9544 6307 58 KBG-2-LS DMY INT 0 12/07/06 4 10640 6889 57 KBG-2-LS DMY INT 0 5 11581 7410 56 KBG-2-LS DMY INT 0 6 12515 7912 57 KBG-2-LS DMY INT 0 7 14114 8794 54 KBG-2-LS DMY INT 0 8 14266 8884 53 KBG-2-LS DMY INT 0 14339' -( 4-1/2" TUBING TAIL, WLEG 14329' ELMD TT LOGGED 06/14/97 14455" -j Mechanical Whipstack 14895" - 3-3116 x 2-718 X-over --- l - --- -- - , __ _ -_ ~- ---- - 1 PBTD 16111' 3-3116 X 2-718" crrrt°ed and perfed 1$145' DATE REV BY COMMENTS DATE REV BY COMMENTS 05/23!97 ORIGINAL COMPLETION 09!18/01 RN/TP CORRECTIONS 02/18/03 MS/tlh CORRECTIONS 06/17/05 RAGPJC CORRECTION TBG TAIL, WLEG 12/07/06 JLJ/TLH GLV GO 04/23!07 RRW CTD HORIZONTAL SIDETRACK POINT MCINTY RE UNfT WELL: P2-19A PERMIT No: 207012 API No: 50-029-22765-01 SEC14 T12N R14E 2649.36 FEL 1531.15 FNL BP Exploration (Alaska) • BP EXPLORATION Page 1 of 11 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To P2-19 P2-19 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task j PLET A Code E NPT Start Rig Rig Phase Spud Date: 3/24/1997 : 4/10/2007 End: 4/24/2007 Release: 4/24/2007 Number: N1 Description of Operations 4/10/2007 00:00 - 02:30 2.50 MOB P PRE Turnkey rig move from G-04B to P2-19A 02:30 - 05:30 3.00 MOB N WAIT PRE Rig on standby while waiting on adjacent wells to be bled off by production operator. 05:30 - 06:00 0.50 MOB P PRE PJSM, MIRU over P2-19A Accept rig at 0600 hrs on 04/10/07. 06:00 - 09:00 3.00 BOPSU P PRE PJSM on RU and testing BOPS, greased tree valves, NU BOP's, Notify AOGCC Jeff Jones of BOP test w/ 2 hour notice 09:00 - 19:30 10.50 BOPSU P PRE Conduct BOP testing. Chart recorded, as well as electronically recorded by SLB. Jeff Jones of AOGCC witnessed testing. Tested gas detection system with Jeff Jones as well. Kill line check valve failed. Get replacement check valve from Nordic 2. 19:30 - 22:30 3.00 RIGU P PRE Press test hardline to Tiger tank with rig. Had to function valves to get press test. Hardline crew did not have a test pump available. 22:30 - 00:00 1.50 BOPSU N RREP PRE Remove damaged kill line check valve and flanged XO. 4/11/2007 00:00 - 03:30 3.50 BOPSU N RREP PRE N/U kill line check valve with flanged connections. 03:30 - 05:00 1.50 BOPSU P PRE Pressure test connections on each side of check valve and body test check valve to 3500 psi. Press test check valve, 250/3500 psi. Chart test. 05:00 - 05:15 0.25 BOPSU P PRE SAFETY MEETING. Review procedure, hazards and mitigation for rig up and pull BP Valve. 05:15 - 08:30 3.25 BOPSU P PRE R/U and attempt to pull BPV using lubricator. Master valve shut initially thought was ice - 1 hour. Opened master and had ice on top of BPV. Thaw with steam on area in cellar. Able to screw into BPV, but not able to turn to release BPV. 08:30 - 08:35 0.08 BOPSU P PRE PJSM for pumping thru BPV. 08:35 - 09:00 0.42 BOPSU P PRE RU and bullhead 5 bbls of methanol thru BPV from kill line. 480psi below BPV. 09:00 - 10;00 1.00 BOPSU P PRE Pull the BPV with no issues. RD the lubricator. 10:00 - 10:15 0.25 KILL P WEXIT Prep to stab coil into injector. 10:15 - 10:30 0.25 KILL P WEXIT PJSM for stabbing coil. 10:30 - 11:30 1.00 KILL P WEXIT Stab coil into injector. 11:30 - 11:45 0.25 KILL P WEXIT PJSM for connecting CTC and bullheading down well. 11:45 - 13:35 1.83 KILL P WEXIT Bullhead 450bb1s of 9.4 brine down to kill well. Attach CTC while bullheading down well. 13:35 - 14:05 0.50 KILL P WEXIT Flowcheck well. Well on vacuum. 14:05 - 14:20 0.25 CLEAN P WEXIT PJSM for PU BHA #1. Fill coil simultaneously. 14:20 - 15:00 0.67 CLEAN P WEXIT Complete filling coil and PT CTC. Good test 15:00 - 20:00 5.00 CLEAN P WEXIT RIH with BHA #1 to mill XN nipple. 1.5bpm/.3bpm - 1.2bpm losses. Slowed rate to .4 bpm with no returns to wait on fluids. 20:00 - 21:15 1.25 CLEAN P WEXIT Tag XN at 14,336' and correct depth to 14,317', -19' CTD. Mill window with 2.6 bpm, 2480 psi. 0.7 bpm returns. Mill thru XN down to 14,323'. Back ream, Ream down .Ream up clean. 21:15 - 21:30 0.25 CLEAN P WEXIT RIH with mill to 14,580'. 2.0 BPM, 1.4 bpm returns. Cleaned out to 20' below bottom perfs. Getting almost full returns after cleaning out below perfs. Fill plugged up loss zone. 21:30 - 00:00 2.50 CLEAN P WEXIT POH. pump 1.0 bpm, 0.4 bpm returns at 80 fpm. Flagged coil at 14,200' EOP. POH. ,4/12/2007 00:00 - 00:15 0.25 CLEAN P WEXIT POH with 3.80" LH milling BHA. 0.2 bpm losses at surface. Held kick while trip drill. Good response. Printed: 4/30/2007 11:49:52 AM • i BP EXPLORATION Operations Summary Report Page 2 of 11 ~ Legal Well Name: P2-19 Common Well Name: P2-19 Spud Date: 3/24/1997 Event Name: REENTER+COMPLETE Start: 4/10/2007 End: 4/24/2007 Contractor Name: NORDIC CALISTA Rig Release: 4/24/2007 Rig Name: NORDIC 1 Rig Number: N1 Date .From - To Hours Task Code NPT Phase Description of Operations l 4/12/2007 00:15 - 00:30 0.25 CLEAN P WEXIT Lay out LH milling BHA. Mill gauged at 3.79 Go / 3.78 NoGo. 00:30 - 02:15 1.75 CLEAN P WEXIT M/U SWS CTC. Pull test with 35K. Press test with 3500 psi. M/U BOT Underreamer BHA to cleanout 7" casing. BOT DB UR, motor, circ sub, disc, 2 jts PH6, checks and CTC. OAL = 86.65'. 02:15 - 05:00 2.75 CLEAN P WEXIT RIH with UR BHA #2. No pump. Full retums. Correct to flag at 14,286'. -15' CTD. RIH to 14,470'. 45K up wt and 18 K down wt with no pump. 05:00 - 08:25 3.42 CLEAN P WEXIT Underream down at 5 fpm, 2.5 bpm, 2700 psi, 2.2 bpm returns. 18K down wt. one stall at 14550', so blades are out. UR down to 14,570'. 2.6 bpm, 1.7- 2.3 bpm returns. bpm returns. Back ream up to 14,450' and underream down again at 5 fpm to 14,570'. Back ream up to 14,450' and underream down a third time at 5 fph to 14,570'. Returns varied from 1.6 to 2.4 bpm on first pass and stayed steady at 2.4 bpm on second pass. 08:25 - 11:45 3.33 CLEAN P WEXIT Drop ball to open circulation sub and POOH. Left 30bbls of flo-pro mud on bottom and chased 30 bbls of flo-pro out of hole. Pumping at 2.5 bpm with 1.5bpm returns while POOH. PJSM for LD tools and RU SL. 11:45 - 15:00 3.25 CLEAN P WEXIT LD reaming assembly. Rig-up SLB slickline with SL BOP and lubricator. Zero depth at rig floor at bottom of dummy WS. 15:00 - 18:00 3.00 CLEAN P WEXIT Attempt to run Dummy WS drift (3.7" x 17') on SL down to 14,570'. Tag on fill at 14,515' multiple times. POOH. 18:00 - 18:40 0.67 CLEAN P WEXIT Lay out dummy WS and M/U PDS memory Caliper logging tool. Zero depth at rig floor. 18:40 - 21:30 2.83 CLEAN P WEXIT RIH and set down at 14,526', not tied-in. Log up wtih memory caliper to 14,000'. POH. 21:30 - 22:30 1.00 CLEAN P WEXIT Lay out PDS memory caliper tool. Download memory data to confirm casing PBTD and ID. 22:30 - 00:00 1.50 CLEAN P WEXIT Rig down SWS slickline. PDS caliper tied-in at bottom of tailpipe, indicated a PBTD of 14,484'. Talk to Anc engineer and determine to set top of whipstock at 14,454'. ID of 7" casing is clean at setting point with a caliper ID of 6.27". 4/13/2007 00:00 - 03:00 3.00 WHIP N WAIT WEXIT Wait for SWS E-Line unit. Prepare equipment at SWS shop and drive to location. 03:00 - 04:00 1.00 WHIP P WEXIT Held rig evacuation drill and H2S drill. Crew evacuated rig to muster area. Reviewed H2S hazards and procedures for rig evacuation with H2S alarm. All personnel accounted for. 04:00 - 07:45 3.75 WHIP P WEXIT R/U SWS E-Line to run BOT whipstock. R/U BOT whipstock on catwalk and orient for highside set. 07:45 - 08:00 0.25 WHIP P WEXIT PJSM for installing RA tags in WS, arm setting tool and PU/RIH a-line BHA. 08:00 - 08:15 0.25 WHIP P WEXIT Install 3 RA tags in WS 10.0' down from top of whipstock. Arm Printed: 4/30/2007 11:49:52 AM ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code ~ NPT Start: 4/10/2007 Rig Release: 4/24/2007 Rig Number: N1 Phase -- -- -- _ 4/13/2007 08:00-08:15 0.25 WHIP P ~ WEXIT 08:15-09:45 1.50 WHIP N SFAL WEXIT 09:45-10:55 1.17 WHIP P WEXIT 10:55 - 14:10 3.25 WHIP P WEXIT 14:10 - 15:20 1.17 WHIP P WEXIT 15:20 - 18:30 3.17 WHIP P WEXIT 18:30 - 18:45 0.25 WHIP P WEXIT 18:45-19:45 1.00 WHIP P WEXIT 19:45 - 21:00 1.25 ZONISO P WEXIT 21:00 - 00:00 3.00 ZONISO P WEXIT 4/14/2007 00:00 - 00:15 0.25 ZONISO P WEXIT 00:15 - 00:30 0.25 ZONISO P WEXIT 00:30 - 01:25 I 0.921 ZONISO I P I I WEXIT 01:25 - 02:20 I 0.921 ZONISO I P I I W EXIT 02:20 - 03:30 I 1.171 ZONISO I P I I W EXIT Page 3 of 11 Spud Date: 3/24/1997 End: 4/24/2007 Description of Operations setting tool. PU WS BHA on E-line. Attempting to arm setting tool. Problems with the SLB explosives testing meter(ohm meter). PU WS BHA on eline. RIH with WS on eline. Currently losing at 20 bbls/hr. Tie-in to depth with GR and CCL log. Correction of -17'. Set WS at 14,454' with 4 deg LOHS orientation. Good weight indication - 28751bs prior, 23701bs after setting. Tagged TOWS after setting and took weight. POOH with 100psi shut-in to prevent swabbing. SAFETY MEETING. Review procedure, hazards and mitigation for rigging down SWS E-Line tools. Rig down SWS E-Line. M/U Cementing nozzle BHA. RIH with cementing nozzle BHA. Tag wipstock pinch point at 14,469': correct -20' to 14,449'. Pick up to 14,400' and circ at 0.5 bpm, 100 psi. R/U SWS cementing equipment. R/U SWS Cementing equipment. SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement. Batch up cement, 20 bbls G cement at 15.8 ppg. 4 hrs thickening time. Cement at weight at 0100 hrs. Stage 5 bbls water. Press test cement line. Coil capacity = 58 bbl. Stage 20 bbls, 15.8 ppg, G Cement, 2.0 bpm, 1000 psi, 1.4 bpm returns. Stage 5 bbls water behind to clean cement line. Displace with rig pump with 9.2 ppg Brine. 20 bbl displ, 2.3 bpm, 1200 psi, 1.6 bpm returns 35 bbl displ, close choke and reduce pump to 1.6 bpm. 250 whp. 38 bbl displ, cement at nozzle, 1.6 bpm, 340 siwhp, Nozzle at 14,450', 45 bbl displ, 1.0 bpm, 200 pp, 400 siwhp, 7 bbls squeezed away. 50 bbl displ, 1.0 bpm, 400 pp, 500 siwhp, 12 bbls squeezed away, 51 bbl displ, 1.0 bpm, 750 pp, 650 siwhp, 13 bbls squeezed, lay in 1/1 at 27 fpm. 55 bbl displ, 1.0 bpm, 1000 pp, 800 siwhp, nozzle at 14300'. Pull at 66 fpm in 4-1/2" 58 bbl displ, 1.0 bpm, 750 pp, 450 siwhp, CMT out nozzle, TOC at 14,130'. pull to safety at 13,970'. 46K up wt. SIWHP dropped to 40 psi, 6 bbls cement left to squeeze. Hesitate 10 min. Sqz 1 bbl at 0.5 bpm, 80 siwhp, wait 10 min. Sqz 1 bbl at 0.5 bpm, 20 siwhp, wait 15 min. Sqz 1/2 bbl, wait 15 min. 30 siwhp. Sqz 1/2 bbl, wait 15 min. 30 siwhp. Printed: 4/30/2007 11:49:52 AM BP EXPLORATION Operations Summary Report Page 4 of 11 ~ Legal Well Name: P2-19 Common Well Name: P2-19 Spud Date: 3/24/1997 Event Name: REENTER+COMPLETE Start: 4/10/2007 End: 4/24/2007 Contractor Name: NORDIC CALISTA Rig Release: 4/24/2007 Rig Name: NORDIC 1 Rig Number: N1 F Date I rom - To Hours Task Code NPT ~ Phase Description of Operations i 4/14/2007 03:30 - 03:45 0.25 ZONISO P WEXIT Wait 15 min, pump 1/2 bbl, 200 siwhp, finally getting a sqz 3:45 - 05:15 5:15 - 08:00 08:00 - 08:15 08:15 - 09:15 09:15 - 10:00 10:00 - 12:40 .50 .75 0.25 1.00 0.75 2.67 ONISO ONISO ZONISO ZONISO STWHIP STWHIP P P P P P P EXIT EXIT WEXIT WEXIT WEXIT WEXIT press. Wait 15 min, pump 1/2 bbl, 250 siwhp, Wait 15 min, pump 1/2 bbl, 450 psi siwhp at 0415 hrs. Hold 500 psi squeeze press for 30 min. Start RIH and circ 30 bbl Biozan at 2.4 bpm with full returns. Dress off cement to 10' above top of whipstock at 14,444'. 2.4 bpm, 1430 psi. Pull to tailpipe and RIH again to 14,444'. Full returns. POH while chasing Biozan pill /cement to surface. 2.6 bpm, 1900 psi. PJSM for jetting stack and swapping BHA's. Jet stack LD swizzle stick and PU window milling BHA. RIH to mill window. C',_ ~ ' - 1 0 - 1 :40 WEXIT Tag cement and mill down to pmc point. ~ C~ P2~~Ig A 19K. Mill from 14,464' - 14469.5'. Correct -11' CTD. ' Pinchpoint now at 14458.5 . Start to time mill at 1'/hr. 2.45bpm/2.36bpm, WOB 2-4k Ibs, 1700-1900 psi, FS 1510 psi. 14:40 - 16:40 2.00 STWHIP P WEXIT Mill to 14462'. 2.45bpm/2.37bpm, W0B 5-6.5k, 1700-2025psi. FS 1510 psi. 16:40 - 18:00 1.33 STWHIP P WEXIT MiU to 14464'. 2.42bpm/2.35bpm, WOB 6-7.5k, 1700-2025psi. FS 1510 psi. 18:00 - 20:00 2.00 STWHIP P WEXIT Mill 3.8" window thru 7" liner. 2.5 bpm, 1700-2000 psi, 0.5 fph. Milled to 14,465'. 20:00 - 22:00 2.00 STWHIP P WEXIT Mill 3.8" window thru 7" liner. 2.5 bpm, 1700-2000 psi, 0.5 fph. Milled to 14,466'. 22:00 - 00:00 2.00 STWHIP P WEXIT Milled out of liner at 14,466'. Milled formation to 14,473' at 4 fph. 2.5 bpm, 1900 psi, full returns. 4/15/2007 00:00 - 01:00 1.00 STWHIP P WEXIT Milled formation to 14,477'. 2.5 bpm, 1900 psi, 4 fph. 01:00 - 03:15 2.25 STWHIP P WEXIT Ream window up and down. Swap to new 9.3 PPG FloPro. 2.5 bpm, 2400 psi, Ream up /down 3 times. Clean window. Full returns. Dry tag OK. 03:15 - 05:45 2.50 STWHIP P WEXIT POH with milling BHA. 2.5 bpm, 2450 psi. 05:45 - 07:00 1.25 STWHIP P WEXIT Lay out window milling BHA. Mill and string reamer gauged at 3.80" Go / 3.79" No Go. M/U swizle stick nozzle. 07:00 - 08:45 1.75 STW HIP P WEXIT Shut in swab. Jet stack with swizle stick. Meanwhile R/U N2 pumpers. 08:45 - 09:00 0.25 DRILL P PROD1 PJSM &THA for B/D CT with N2. Made 2 additions to procedure. 09:00 - 09:30 0.50 DRILL P PROD1 Pump 50bbls of water ahead followed by 10bbls of McOH spacer. 09:30 - 09:45 0.25 DRILL P PROD1 P/T N2 lines _ OK. 09:45 - 10:45 1.00 DRILL P PROD1 Blow down CT with N2 & bleed down. 10:45 - i 1:00 0.25 DRILL P PROD1 PJSM &THA for stripping off & pulling back CT to the reel. 11:00 - 13:00 2.00 DRILL P PROD1 P/U injector & cut off CTC. Prep end of CT for internal grapple. Slip grapple connector into CT, M/U & pull test. Strip-off CT from injector & spool back CT stub to reel. Secure CT with Printed: 4/30/2007 11:49:52 AM • • BP EXPLORATION Page 5 of 11 Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Spud Date: 3/24/1997 Event Name: REENTER+COMPLETE Start: 4/10/2007 End: 4/24/2007 Contractor Name: NORDIC CALISTA Rig Release: 4/24/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ;Hours Task Code i NPT Phase ~ Description of Operations 4/15/2007 11:00 - 13:00 2.00 DRILL P PROD1 crossbar and chains & prep reel for shipment. Release reel drive bushings. P/U eline-free CT reel with bridge crane. 13:00 - 13:15 0.25 DRILL P PROD1 PJSM with Veco crew on CT reel swap. 13:15 - 16:00 2.75 DRILL P PROD1 Open up bombay doors & lower eline-free CT reel onto Veco trailer. P/U replacement eline CT reel into reel house with bridge crane & align drive pins & bushing. Note: Length of new eline CT reel = 17320'. Length of eline in reel = 17611'. Slack = 1.7%. 16:00 - 19:00 3.00 DRILL P PROD1 R/U a-line pressure bulkhead, inner reel valve & hardline to CT reel. Meanwhile conduct a simulated McOH spill drill with Nordic crew. 19:00 - 20:30 1.50 DRILL P PROD1 Install internal grapple into new coil and pull test. Re-tighten grapple. 20:30 - 21:00 0.50 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for pulling coil to injecter head. Updated step by step procedure as required. 21:00 - 00:00 3.00 DRILL P PROD1 Pull coil into injecter head with tugger. Cut off 15' of coil. M/U SWS CTC and pull test. M/U BHI E-Line UOC. Fill coil with 9.3 ppg FloPro at 2.7 bpm. 4/16/2007 00:00 - 00:15 0.25 DRILL P PROD1 Pressure test SWS CTC, coil and hardline. Good test. 00:15 - 01:15 1.00 DRILL P PROD1 M/U BHI Coiltrak Build BHA with 1.6 deg motor and HCC Bi-Center Bit #1. OAL = 66.03'. Test BHA, OK. 01:15 - 04:00 2.75 DRILL P PROD1 RIH with Build BHA #5. Circ at 0.2 bpm. 95 fpm. full returns. 04:00 - 05:15 1.25 DRILL P PROD1 Log GR tie-in from 14,350'. Log down at 150 fph. 15K down wt. Correct -9' CTD. Log down and tag bottom at 14478'. 05:15 - 06:00 0.75 DRILL P PROD1 Drill build section in Kuparuk sand. 2.4 bpm, 3050-3500 psi, 30L TF, 1-2 K wob, 45 fph. 10.9 ecd Drilled to 14,496'. 06:00 - 10:00 4.00 DRILL P PROD1 Drill to 14560' with 15L-HS TF, 2.48/2.41 bpm, 3050/3500psi, 1-2k DWOB, 10.75ppg ECD & 15fph ave ROP. Up wt = 36k. Run-in wt = 21 k. PVT = 324bb1s. IAP = 170psi. OAP = 35psi. LSRV = 66k. Drilling ratty & getting frequent motor stalls. Determine RA tag at 14,465'. 1 ft deeper than planned. Adjust all depth 1 ft deeper. 10:00 - 10:30 0.50 DRILL P PROD1 Drill to 14578' with 15L TF, 2.50/2.40bpm, 3050/3200psi, 1-2k DWOB, 10.75ppg ECD & 35fph ave ROP. 10:30 - 10:35 0.08 DRILL P PROD? PUH, reduce pumps to 1 bpm & shoot off btm survey. 10:35 - 11:30 0.92 DRILL P PROD1 Drill to 14607' with 15L TF, 2.50/2.40bpm, 3050/3350psi, 1-2k DWOB, 10.78ppg ECD & 35fph ave ROP. 11:30 - 11:35 0.08 DRILL P PROD1 PUH, reduce pumps to 1 bpm & shoot off btm survey. 11:35 - 12:00 0.42 DRILL P PROD1 Drill to 14614' with 15L TF, 2.50/2.40bpm, 3050/3350psi, 1-2k DWOB, 10.78ppg ECD & 35fph ave ROP. 12:00 - 12:15 0.25 DRILL P PROD1 Wiper trip clean to window. RBIH clean to btm. 12:15 - 14:15 2.00 DRILL P PROD1 Drill to 14667' with 60L TF, 2.65/2.55bpm, 3050/3250psi, 1-2k DWOB, 10.78ppg ECD & 45fph ave ROP. 14:15 - 14:20 0.08 DRILL P PROD1 PUH, reduce pumps to lbpm & shoot off btm survey. 14:20 - 15:20 1.00 DRILL P PROD1 Drill to 14698' with 15L TF, 2.65/2.55bpm, 3050/3250psi, 1-2k DWOB, 10.78ppg ECD & 55fph ave ROP. Printed: 4/30/2007 11:49:52 AM BP EXPLORATION Page 6 of 11 Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Spud Date: 3/24/1997 Event Name: REENTER+COMPLETE Start: 4/10/2007 End: 4/24/2007 ,Contractor Name: NORDIC CALISTA Rig Release: 4/24/2007 ',Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To ~ Hours ! Task ~ Code NPT Phase Description of Operations 4/16/2007 15:20 - 15:25 0.08 DRILL P PROD1 PUH, reduce pumps to lbpm & shoot off btm survey. 15:25 - 16:05 0.67 DRILL P PRODi Drill & land buld/turn section ~ 14740' (+/-9043'ssvd) with 15-30L TF, 2.65/2.55bpm, 3050/3350psi, 1-2k DWOB, 10.81 ppg ECD & 65fph ave ROP. Should have 97+ degs ~ the bit. 16:05 - 19:00 2.92 DRILL P PROD1 POOH drilling BHA above window. Paint EOP flag C~1 14300' & open up EDC. Continue POOH drilling BHA #5. Circ. at 3.0 bpm to surface. 19:00 - 19:15 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for C/O BHA. 19:15 - 20:15 1.00 DRILL P PROD1 UO BHA #5. Check bit. no chipped cutters. Adjust motor to 1.1 deg bend. M/U Lateral BHA #6 with RES tool, MWD and orienter. OAL = 78.88'. 20:15 - 23:10 2.92 DRILL P PROD1 RIH with Lateral BHA #6. 90 fph, pump 0.2 bpm. full returns. Correct to CT flag at 14,300' EOP. -14'. RIH thru window to 14,480'. 23:10 - 23:20 0.17 DRILL P PRODi Log GR tie-in at RA tag. Added 2' to CTD. 23:20 - 23:30 0.17 DRILL P PROD1 RIH to bottom. Tag at 14,740'. 23:30 - 00:00 0.50 DRILL P PROD1 Log up with MAD pass for RES / GR. 2.3 bpm, 2680 psi, 36K up wt. 10.65 ECD, .5000 AP 4/17/2007 00:00 - 00:30 0.50 DRILL P PROD1 Log MAD pass with RES / GR up to window. RIH to bottom. 00:30 - 02:00 1.50 DRILL P PROD1 Drill Lateral, 2.6 bpm, 3100-3900 psi, 110E TF, 97 deg. 45 fph, 10.7 ECD, 5050 psi, drilled to 14820'. 02:00 - 02:45 0.75 DRILL P PROD1 Drill Lateral, 2.6 bpm, 3100-3900 psi, 110E TF, 96 deg. 45 fph, 10.7 ECD, 5050 psi, Drilled to 14860'. Generator #2 shutdown. 02:45 - 03:15 0.50 DRILL P PROD1 Wiper trip to window while trying to re-start Gen #2. 37K up wt. Clean hole. 03:15 - 05:15 2.00 DRILL N SFAL PROD1 Park bit at 14,474'. circ at 1.1 bpm while waiting to get Gen #2 running again. Trouble getting motor started. Note that the heat activated safety valve on the return fuel line closed due to mechanical failure. Re-start Gen 2 and put on line OK. Both gen sets working OK and sharing load. 05:15 - 05:25 0.17 DRILL P PROD1 RIH to bottom. 05:25 - 06:30 1.08 DRILL P PROD1 Drill Lateral, 2.5 bpm, 3100-3900 psi, 100E TF, 95 deg. 45 fph, 10.7 ECD, 5030 psi, Several stalls at 14,878', indicating a fault. Drilled to 14,880'. 06:30 - 08:50 2.33 DRILL P PROD1 Drill to 14950' with 60-90L TF, 2.60/2.48bpm, 3100/3500psi, 1-2k DWOB, 10.83ppg ECD & 40fph ave ROP. Up wt = 34k. Run-in wt = 12k. PVT = 317bb1s. IAP = 340psi. OAP = 420psi. LSRV = 65k. 08:50 - 09:45 0.92 DRILL P PROD1 Orient & drill to 15000' with 90R TF, 2.60/2.48bpm, 3100/3300psi, 1-2k DWOB, 10.83ppg ECD & 45fph ave ROP. 09:45 - 10:25 0.67 DRILL P PROD1 Wiper trip clean to window. RBIH clean to btm. 10:25 - 13:00 2.58 DRILL P PROD1 Orient & drill to 15106' with 75-90R TF, 2.60/2.48bpm, Printed: 4/30/2007 11:49:52 AM BP EXPLORATION Page 7 of 11 Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Spud Date: 3/24/1997 Event Name: REENTER+COMPLETE Start: 4/10/2007 End: 4/24/2007 Contractor Name: NORDIC CALISTA Rig Release: 4/24/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From -To ',: Hours Task Code; NPT Phase Description of Operations 4/17/2007 10:25 - 13:00 2.58 DRILL P PROD1 13:00 - 14:30 1.50 DRILL P PROD1 14:30 - 15:20 0.83 DRILL P PROD1 15:20 - 17:00 1.67 DRILL P PROD1 17:00 - 19:30 J 2.50 J DRILL J P J J PROD1 19:30 - 20:00 0.50 DRILL P PROD1 20:00 - 20:15 0.25 DRILL P PROD1 20:15 - 20:40 0.42 DRILL P PROD1 20:40 - 23:20 2.67 DRILL P PROD1 23:20 - 00:00 0.67 DRILL P PROD1 4/18/2007 00:00 - 00:30 0.50 DRILL P PROD1 00:30 - 04:50 4.33 DRILL P PROD1 04:50 - 06:10 1.33 DRILL P PROD1 06:10 - 08:40 2.50 DRILL P PROD1 08:40 - 10:10 I 1.501 DRILL I P I I PROD1 10:10 - 11:10 I 1.001 DRILL I P I I PROD1 11:10 - 12:00 0.83 DRILL P PROD1 12:00 - 12:15 0.25 DRILL P PROD1 12:15 - 12:45 0.50 DRILL P PROD1 12:45 - 13:20 0.58 DRILL P PROD1 13:20 - 16:00 2.67 DRILL P PROD1 16:00 - 18:00 2.00 J DRILL P I PROD1 18:00 - 21:00 3.001 DRILL P PROD1 21:00 - 00:00 3.00 DRILL P PROD1 9/2007 00:00 - 02:00 2.00 DRILL P PROD1 02:00 - 04:30 2.50 DRILL P PROD1 04:30 - 05:00 0.50 DRILL P PROD1 05:00 - 05:45 0.75 DRILL P PROD1 3100/3300psi, 1-2k DWOB, 10.83ppg ECD & 65fph ave ROP. Drill lateral, 2.6 bpm, 3000 - 3900 psi, 1-3K wob, 120R TF, 30-50 fph, 95 deg incl, 10.8 ecd, 5046 psi AP. Drilled to 15,149'. Wiper trip to window. Drill lateral, 2.6 bpm, 3000 - 3900 psi, 1-3K wob, 80R TF, 40-50 fph, 95 deg incl, 10.8 ecd, 5064 psi AP. Drilled to 15,200'. Drill lateral, 2.6 bpm, 3000 - 3900 psi, 1-3K wob, 120R TF, 40-50 fph, 92 deg incl, 10.9 ecd, 5080 psi AP. Drilled to 15,300'. Wiper to the window. Log tie-in +6 correction . Continue with wiper to TD. Drill lateral, 2.6 bpm, 3460 psi, 3160 psi FS, 1 K wob, 90L TF, 40-50 fph, 91 deg incl, 10.9 ecd, 5080 psi AP. Drilled to 15,450. W iper to window. Wiper to window. Drill lateral, 2.55 bpm, 3430 psi, 3160 psi FS, 2K wob, 105E TF, 90 fph, 91 deg incl, 10.9 ecd, 5106 psi AP. Drilled to 15542, Swap TF to .75R. Swap mud and drill to 15600. Wiper to window. Drill lateral, 2.4 bpm, 3400 psi FS with new FloPro, 2K wob, 105E TF, 30-40 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 15,662'. Drill lateral, 2.4 bpm, 3400 psi FS with new FloPro, 2K wob, 105E TF, 30-40 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 15,695'. Drill lateral, 2.4 bpm, 3400-3900 psi, 2K wob, 100R TF, 30-40 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 15,713'. Stacking wt. Wiper trip to window. Clean hole. Log tie-in at RA tag. added 7' to CTD. Pull above window into 7" casing and wash casing clean up to tailpipe at 14,329'. Wash up and down in 7", two times at max circ rate of 2.7 bpm, 3800 psi. RIH to bottom. Drill lateral, 2.4 bpm, 3400-3900 psi, 2K wob, 130R TF, 20-30 fph, 87 deg incl, 11.1 ecd, 5180 ap. Drilled to 15,750'. Drill lateral, 2.4 bpm, 3400-3900 psi, 2K wob, 80R TF, 20-30 fph, 84 deg incl, 11.1 ecd, 5200 ap. Drilled to 15,792'. Drill lateral, 2.5 bpm, 3400-3900 psi, 2K wob, 80R-80L TF, 30 fph, 84 deg incl, 11.1 ecd, 5210 ap. Drilled to 15,852. Continual slow drilling 24 ft/hr decided to POH for bit. POH for bit Change out Bi Center for DSX49, and new motor. Bit 7-7 two nozzles plugged . Function test BOP. MU BHA with new motor and DSX49 HyCalog bit. RIH Tie-in log correction -21'. Continue to RIH. Printed: 4/30/2007 11:49:52 AM • BP EXPLORATION Page 8 of 11 Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA ~~Rig Name: NORDIC 1 Date 1 From - To Hourst Task Code ; __. - j_ _ --- NPT 4/19/2007 105:45 - 08:00 ~ 2.251 DRILL P 08:00 - 10:00 2.00 I DRILL P 10:00 - 11:45 1.75 DRILL P 11:45 - 14:00 2.25 DRILL P 14:00 - 16:30 I 2.501 DRILL I P 16:30 - 18:15 1.75 DRILL P 18:15 - 00:00 5.75 DRILL P 14/20/2007 ~ 00:00 - 04:50 4.831 DRILL P 04:50 - 06:00 I 1.171 DRILL I P 06:00 - 06:10 0.17 DRILL P 06:10 - 07:30 1.33 DRILL P 07:30 - 09:00 1.501 DRILL P 09:00 - 09:30 I 0.501 DRILL I P 09:30 - 11:45 2.25 DRILL P 11:45 - 12:30 0.75 DRILL P 12:30 - 15:30 3.00 CASE N WAIT 15:30 - 15:45 0.25 CASE P 15:45 - 16:15 I 0.501 CASE I C 16:15 - 19:10 2.92 CASE C 19:10 - 19:20 0.17 CASE C 19:20 - 20:00 0.67 CASE C Spud Date: 3/24/1997 Start: 4/10/2007 End: 4/24/2007 Rig Release: 4/24/2007 Rig Number: N1 Phase Description of Operations PROD1 Drill lateral, 2.4 bpm, 3500-3900 psi, FS 3400 psi, 2K wob, 80L TF, 30 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 15908'. PROD1 Drill lateral, 2.5 bpm, 3500-3900 psi, FS 3400 psi, 2K wob, 80L TF, 30 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 16,000'. PROD1 W iper trip to window. Clean hole. PROD1 Drill lateral, 2.5 bpm, 3500-3900 psi, FS 3400 psi, 2K wob, 80L TF, 40 fph, 87 deg incl, 11.2 ecd, 5250 ap. Drilled to 16,065'. PROD1 Drill lateral, 2.5 bpm, 3500-3900 psi, FS 3400 psi, 2K wob,. 80L TF, 60 fph, 90 deg incl, 11.2 ecd, 5250 ap. Drilled to 16,151'. PROD1 Wiper trip to window. Clean hole. PROD1 Drill lateral, 2.5 bpm, 3500-3900 psi, FS 3400 psi, 2K wob, 80L TF, 60-10 fph, 90 deg incl, 11.2 ecd, 5250 ap. Drilled to 16,218. Slow drilling still have MW and good weight transfer. PROD1 Drill lateral, 2.4 bpm, 3500-3900 psi, FS 3400 psi, 2-3K wob, 90L TF, 5-1 fph, 90 deg incl, 11.29 ecd, 5290 ap. Slow drilling still have MW and good weight transfer.Fault ID at 16178.. High GR at 16190 indicating faulted into the HRZ. Drilled to Geo need time decide plan of action. See over pull 10K intermittentlt form 16225 to 16175. and again at 15932. PRODi Wiper to tailpipe. Circ. cuttings sample to surface. GEO confirmed that we have drilled into HRZ. PROD1 Tie -in, correction +9'. PROD1 Continue wiper to TD. Clean hole to 16,205', reaming shale, set down at 16, 205' several times. Ream down to 16,236', then set down at 16205' several times. Ream down to 16,236'. Tag Final TD at 16,236'. PRODi Plan forward is to set 2 jts of 2-7/8" liner on bottom to position liner shoe above HRZ shales. POH to window. PROD1 Clean out 7" casing from window to tailpipe. Circ at 2.7 bpm thru bit. Work up/down. Open circ sub and cleanout casing again thru circ sub at 3.1 bpm. Full returns. PROD1 POH pumping at 2.8 bpm. PROD1 UO drilling BHA. Bit graded at 1-1-I. RUNPRD Wait for BOT shop to build seal unit for GS spear. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for M/U BOT spacer BHA. RUNPRD M/U Guide shoe, 2 jts 2-7/8" liner, XO, 2.70" Deployment sleeve, seal unit, XO, 3" GS Hyd Release spear, XO and BHI tools. OAL = 107.63'. RUNPRD RIH with BHA #8, BOT Open Hole Spacer BHA on BHI tools. RUNPRD Log tie - in. Correction = +4'. RUNPRD RIH.to 16,000. Dn Wt 16K, Up Wt 45K, RIH Set down at 16204 PU RIH 66 fpm set down 16204 and work to 16210'. PU 8 K over. Close EDC pump .36 bpm 3760 psi. initiall with no returns up increased to full returns. PU ~ 16201 saw pressure Printed: 4/30/2007 11:49:52 AM • BP EXPLORATION Operations Summary Report Page 9 of 11 Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To P2-19 P2-19 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT~ Start Rig Rig Phase Spud Date: 3/24/1997 : 4/10/2007 End: 4/24/2007 Release: 4/24/2007 Number: N1 Description of Operations 4/20/2007 19:20 - 20:00 0.67 CASE C RUNPRD decrease to 2000 psi. RIH was pressure increase ~ 16206'. Released from dummy liner. Top of liner at 16,145'. 20:00 - 20:45 0.75 CASE C RUNPRD Circulate new mud to running tool 20:45 - 00:00 3.25 CASE C RUNPRD POH spotting new mud in open hole. 4/21/2007 00:00 - 02:00 2.00 CASE C RUNPRD LD Liner running tool. RU N2 for blow down. 02:00 - 06:00 4.00 CASE N WAIT RUNPRD Wait on vac truck for bleach pill for pickling CT. 06:00 - 07:00 1.00 CASE P RUNPRD Pickle E-Line coil. Pump 40 bbl water, 15 bbl Bleach, 20 bbl water with inhibitor, 10 bbl MEOH. 07:00 - 07:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping N2. 07:15 - 09:00 1.75 CASE P RUNPRD Press test N2 line. Pump N2 at 1500 CFM for 22 min. Divert returns to tiger tank. Bleed off coil press thru choke to Tiger tank. 09:00 - 11:00 2.00 CASE P RUNPRD Cut off 15' coil. Install inside grapple. Pull test grapple. Pull coil stub to reel. Secure coil on reel. 11:00 - 11:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for lowering coil onto trailer and picking up next reel. 11:15 - 13:00 1.75 CASE P RUNPRD Lower E-coil reel onto trailer. Switch trailers. Pickup next reel of E-free coil. Close door. 13:00 - 14:00 1.00 CASE P RUNPRD M/U internal grapple into coil. Pull test. Remove cross baron reel. Pull coil to injecter and stab coil. 14:00 - 16:00 2.00 CASE P RUNPRD M/U CTC and pull test. Press test inner reel valve. Fill coil with FloPro. Insert dart and displace dart. Dart on seat at 57.6 bbl. Press test CTC. 16:00 - 16:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running liner. 16:15 - 20:45 4.50 CASE P RUNPRD Run 2-7/8" x 3-3/16" liner with BOT float and deployment equipment. 41 jts of 2-7/8", 6.4#, L-80, STL Liner 18 jts of 3-3/16", 6.2#, L-80, TCII Liner 1 jt of 3-1/2", 9.3#, L-80, STL Liner. OAL = 1,846.91'. 20:45 - 00:00 3.25 CASE P RUNPRD RIH with Iiner.At 14400' Up Wt 50K & Dn Wt 14k, Continue to RIH and Tag at 16145'.Up wt 60K 4/22/2007 00:00 - 00:45 0.75 CASE P RUNPRD Launch 5/8" stl ball with 1000 psi and circulate to liner running tool. Ball on seat at 50.3 bbl. Pressure to 2000 psi and release from liner pressure to 4100 psi to shear ball seat. 00:45 - 04:00 3.25 CASE P RUNPRD Swap well over to 9.3 KCL. 2.58 ~ 2950 psi. 04:00 - 05:00 1.00 CASE N WAIT RUNPRD Wait on return of vac with cement contaminant pill. 05:00 - 05:45 0.75 CEMT P RUNPRD Ru cementers & clean up 05:45 - 06:00 0.25 CEMT P RUNPRD PJSM for cementing operation. 06:00 - 07:10 1.17 CEMT P RUNPRD Batch mix 25 bbl 15.8 expanding cement. Cement to weight at 06:30 hrs. Pump 2 bbl H2O and PT lines to 4000 psi. 07:10 - 08:15 1.08 CEMT P RUNPRD Stage 23 bbls, 15.8 PPG, Expanding G Cement, 2,0 bpm, 900 psi. Cleanout cement line. Insert dart. Displace dart with 2# Biozan, 24 bbl Biozan 20 bbl displ, 2.6 bpm, 2000 psi, full returns. 40 bbl displ, 2.6 bpm, 1960 psi, full returns. 46.2 bbl displ, zero out total, cement at shoe. 50 bbl displ, 1.3 bpm, 400 psi, full returns. Printed: 4/30/2007 11:49:52 AM • BP EXPLORATION Page 10 of 11 Operations Summary Report Legal Well Name: P2-19 Common Well Name: P2-19 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT __ _ __ 4/22/2007 07:10 - 08:15 1.08 CEMT P 08:15 - 11:00 I 2.751 CEMT I P 11:00 - 11:45 0.75 CEMT P 11:45 - 12:00 0.25 EVAL P 12:00 - 15:15 ~ 3.25 ~ EVAL ~ P 15:15 - 17:30 I 2.25 I EVAL I P Spud Date: 3/24/1997 Start: 4/10/2007 End: 4/24/2007 Rig Release: 4/24/2007 Rig Number: N1 Phase Description of Operations RUNPRD Dart landed on LW P at 57.3 bbl, sheared at 3200 psi. Displace at 3.0 bpm. 60 bbl displ, 3.0 bpm, 2800 psi, full returns. 66 bbl displ, 3.0 bpm, 3260 psi, full returns, slow rate to 1.4 bpm. 67 bbl displ, 1.3 bpm, 1060 psi, full returns, Bumped LWP at 68.8 bbl, [0.1 bbl early]. Press up to 1900 psi. Bleed off and check floats, Floats holding. 22.5 bbls returns on out totalizer. Good cement job. No problems, 22.5 of 23 bbls cement returned. RUNPRD Press up on coil, sting out, circ Biozan slow at liner top, POH replacing coil voidage with Biozan. 70 fpm, 45K up wt. RUNPRD Lay out BOT CTLRT. LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for picking MCNL / GR logging tools. LOW ERi M/U 2.3" Mill, motor, 2 jts 1-1/4" CSH, xo, MCNL / GR carrier, BOT circ sub and hyd discon, xo, 62 jts of CSH, SWS MHA. OAL = 2025.8'. LOWERI RIH with BHA #9, MCNUGR/CCL Logging tools and motor with 2.3" mill. Circ at 0.4 bpm. SWS UCA cement sample at 1200 psi at 1600 hrs. 17:30 - 18:40 1.17 EVAL P LOWERI Log down at 30 fpm with memory CNUGR starting at 14,100'. Pump 1.0 bpm. Full returns. Pump 25 bbls FloPro pert pill down coil. Displace with Brine. Tag PBTD at 16,141' uncorrected depth. 18:40 - 19:40 1.00 EVAL P LOW ER1 Log up at 60 fph, circ 0.6 bpm. 54K up wt, lay in new High vis, 9.3 PPG FloPro pert pill. POH to 14000. Drop 5/8" AI ball and launch with1200 psi. Ball rolling. 19:40 - 23:30 3.83 EVAL P LOW ER1 RIH to 14500 while circulating ball down ~ 1.5 bpm and 2400psi. Ball on seat with 51.6 bbls. Shear with 2900 psi. POH. 2.4 bpm ~ 3340 psi. 23:30 - 00:00 0.50 EVAL P LOW ER1 Stand back CSH 4/23/2007 00:00 - 01:00 1.00 EVAL P LOW ER1 Stand back the CSH. 01:00 - 01:15 0.25 EVAL P LOWERI PJSM for LD the source tool. 01:15 - 02:00 0.75 EVAL P LOW ER1 Remove radioactive source and LD the memory tool. PBTD = 16,108' from memory GR log. TOL = 14,291' 02:00 - 03:00 1.00 EVAL P LOW ER1 Jet stack and load guns into pipe shed. 03:00 - 04:30 1.50 EVAL P LOW ERi Test Lap to 2000 psi. Lost 150 psi in 30 minutes. Good Test. Continnue to load Pipe with guns. 04:30 - 04:50 0.33 PERFO P LOW ER1 Rig up floor to picking up guns. 04:50 - 04:45 23.92 PERFO P LOW ER1 PJSM for running guns. Subjects discussed, Pinch points, overhead loads ,sharp edges on guns, dont handle guns rough could cause to fire low order. No grinding welding hammering near guns. 04:45 - 06:15 1.50 PERFO P LOW ER1 PU 45 guns. ' 06:15 - 06:30 0.25 PERFO P LOW ER7 SAFETY MEETING with day crew. Reviewed procedure, hazards and mitigation for running guns. 06:30 - 07:30 1.00 PERFO P LOW ER1 M/U rest of the perf guns. PrinteU: 4/30/2007 11:49:52 AM i • BP EXPLORATION Page 11 of 11 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ~ 3 a Name: ell Name: e: Name: From - To P2-19 P2-19 REENTE NORDIC NORDIC Hours ~ R+COM CALIST 1 Task j , PLET A Code E NPT Start Rig Rig Phase Spud Date: 3/24/1997 : 4/10/2007 End: 4/24/2007 Release: 4/24/2007 Number: N1 Description of Operations 4/23/2007 07:30 - 07:45 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for running 16 stds of CSH and rest of BHA. 07:45 - 09:00 1.25 PERFO P LOWERI RIH with 16 stds of CSH workstring. M/U SWS MHA. OAL = 1,963.36'. 09:00 - 11:50 2.83 PERFO P LOWERI RIH with BHA #10, SWS, 2", perforating guns, loaded at 6 SPF. 860' of perfs. circ at 0.3 bpm, 50 psi. Circ. New 150K FloPro pert pill, 15 bbls ahead of ball. Tag PBTD at 16140' CTD . Pick up and correct depth to 16,108' PBTD. 11:50 - 12:45 0.92 PERFO P LOW ER1 Pull up to ball drop position at 16057'. Insert 5/8" AL ball. Displace with 10 bbl FloPro pill at 2.0 bpm, 2100 psi. Pull up to 16,033'. Circ. 9.3 Brine, 2.0 bpm, 2200 psi. slow to 1.0 bpm, 530 psi, at 42 bbls. Ball on seat at 56 bbls. Pull at 5 fpm while increasing press. Fired at 2800 psi. Pull up and fire guns on depth while moving. Good indication of guns firing. 12:45 - 15:45 3.00 PERFO P LOW ERi POH with pert guns. Flow check with guns above liner top. No flow. POH to surface. Flow check at surface. No flow. 15:45 - 17:00 1.25 PERFO P LOWERI PJSM. UO SWS MHA. Stand back 16 stds of CSH workstring. 17:00 - 17:15 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for laying out fired pert guns and blanks. 17:15 - 21:00 3.75 PERFO P LOW ER1 Lay out fired 2" pert guns. 21:00 - 21:30 0.50 W HSUR P POST Clear floor PU nozzel fro freeze protection. 21:30 - 22:30 1.00 W HSUR P POST RIH to 5000 ' 22:30 - 23:30 1.00 WHSUR P POST POH lay in freeze protection diesel. 23:30 - 00:00 0.50 WHSUR P POST Monitor well. stablized at 205 psi. 4/24/2007 00:00 - 01:00 1.00 WHSUR N WAIT POST wait on BPV crew. 01:00 - 02:00 1.00 WHSUR P POST Close master and swab with 200 psi shut in wellhead pressure. POP off well. Set BPV with lubricator. 02:00 - 05:00 3.00 WHSUR P POST Clean pits. ND BOP's Prep to move rig. RELEASED RIG AT 0500 HRS, 04/24/07. TOTAL OF 13.96 DAYS FROM RIG ACCEPT TO RELEASE. ALL FURTHER DIMS INFORMATION WILL BE ON P2-22 DIMS REPORTS. Printed: 4/30/2007 11:49:52 AM r - bp BP Alaska s"s Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 4/23/2007 Time: 09:29:33 Page: 1 Field: Pant McIntyre Co-ordinate(NE) Reference: Well: P2-19, True North Site: Pt Mac 2 Vertical (TVD) Reference: P2-19: 46.5 Well: P2-19 Section (VS) Reference: Well (O.OON,O.OOE,32.36Azi) Wellpath: P2-19A Survey Calculation Method: Minimum Curvature Db: Oracle - - -- - - - --- Field: Point McIntyre North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Levi Geomagnetic Model: lx,)gm2006 Site: Pt Mac 2 TR-12-14 UNITED STATES :North Slope Site Position: Northing: 5995140.76 ft Latitude: 70 23 32.530 N From: Map Fasting: 674873.98. ft Longitude: 148 34 37.934 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: P2-19 Slot Nam: 19 P2-19 Well Position: +N/S 3241.42 ft Northing: 5998537.01 ft Latitude: 70 24 4.379 N +Fl-W 6666.58 ft Fasting : 681462.48 ft Longitude: 148 31 22.620 W Position Uncertainty: 0.00 ft WeIlpath: P2-19A Drilled From: P2-19 Tie-on Depth: 14450.00 ft Current Datum: P2-19: Height 46.50 ft Above System Datum: Mean Sea Level Magnetic Data: 4/15/2007 Declination: 24.08 deg Field Strength: 57670 nT Mag Dip Angle: 81.02 deg Vertical Section: Depth From (TVD) +N/-S +FJ-W Direction ft ft ft deg 34.30 0.00 0.00 32.36 Survey Program for Defmitive WeIlpaW Date: 1/24/2007 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 100.00 14600.00 2 : Gyrodata cont.drillpipe m/ GYD-CT-DMS Gyrodata cont.drillpipe m/s 14600.60 16236.00 MWD(14455.00-16236.00) MWD MWD-Standard Annotation - -- MD TVD ft ft __ -- - - - - 14450.00 9011.00 TIP 14455.00 9014.11 KOP 16236.00 0.00 TD Survey: MWD Start Date: 4/18/2007 Company: Baker Hughes INTEQ Engineer: Tool: MW D;MW D -Standard Tied-to: From: Definitive Path Survey MD Incl Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Tool ~ ft deg deg ft ft ft ft ft ft ft deg/100ft - _ - - - - - 14450.00 51.54 29.97 9011.00 8964.50 8273.24 6310.39 6006960.53 687569.72 10365.96 0.00 MWD 14455.00 51.61 30.00 9014.11 8967.61 8276.63 6312.35 6006963.97 687571.59 10369.87 1.48 MWD 14455.00 51.61 30.00 9014.11 8967.61 8276.63 6312.35 6006963.97 687571.59 10369.87 0.00 MWD 14485.14 55.02 29.79 9032.12 8985.62 8297.59 6324.39 6006985.20 687583.13 10394.02 11.33 MWD 14510.81 59.22 29.63 9046.05 8999.55 8316.31 6335.08 6007004.18 687593.35 10415.55 16.37 MWD 14539.59 64.62 29.47 9059.59 9013.09 8338.39 6347.59 6007026.56 687605.33 10440.90 18.77 MW D 14569.31 70.72 29.31 9070.88 9024.38 8362.33 6361.08 6007050.82 687618.22 10468.34 20.53 MW D 14598.71 76.59 27.16 9079.15 9032.65 8387.18 6374.41 6007075.98 687630.95 10496.46 21.16 MW D 14629.21 80.30 22.55 9085.26 9038.76 8414.28 6386.96 6007103.38 687642.83 10526.07 19.16 MW D 14659.94 82.63 17.94 9089.82 9043.32 8442.78 6397.47 6007132.13 687652.65 10555.78 16.66 MWD 14693.14 58.55 16.65 9092.37 9045.87 8474.37 6407.30 6007163.94 687661.71 10587.73 18.25 MWD (~~~ -~- i • x y ~I%~ by BP Alaska ~$ Baker Hughes INTEQ Survey Report 1NTEQ Company: BP Amoco Date: 4/23/2007 Tim e: 09:29:33 Page: 2 FSeld: Point Mcln e Co-ordinate(NE) R eference: Well: P2-19, True North Site: Pt Mac 2 Ver6cal(TVD) Reference: P2-19: 46.5 Well: P2-19 Section (VS) Reference: Well (O.OON,O.OOE,32.36Azi) Wellpath: P2-19A Survey Calculation Method: Minimum Curvature _ Db: Oracle Survey _. __ MD Incl Atiiu TVD Sys TVD N/S F.~W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 14725.21 95.50 16.34 9091.24 9044.74 8505.09 6416.40 6007194.87 687670.06 10618.54 21.69 MWD 14754.97 98.38 13.53 9087.65 9041.15 8533.62 6424.01 6007223.58 687676.97 10646.72 13.47 MWD 14784.99 97.55 9.84 9083.48 9036.98 8562.73 6430.03 6007252.82 687682.28 10674.53 12.48 MWD 14815.27 95.62 5.13 9080.01 9033.51 8592.55 6433.94 6007282.72 687685.47 10701.81 16.71 MWD 14845.27 95.13 0.74. 9077.20 9030.70 8622.37 6435.47 6007312.57 687686.28 10727.82 14.66 MW D 14881.80 95.51 355.56 9073.81 9027.31 8658.71 6434.30 6007348.87 687684.22 10757.89 14.16 MW D 14910.68 95.57 351.57 9071.02 9024.52 8687.27 6431.08 6007377.34 687680.31 10780.29 13.75 MW D 14940.91 97.07 347.54 9067.69 9021.19 8716.81 6425.63 6007406.74 687674.15 10802.33 14.15 MW D 14969.20 96.92 344.53 9064.24 9017.74 8744.06 6418.86 6007433.81 687666.71 10821.71 10.57 MWD 14999.74 95.01 348.52 9061.07 9014.57 8773.59 6411.78 6007463.16 687658.93 10842.87 14.42 MWD 15029.55 95.32 352.58 9058.39 9011.89 8802.87 6406.91 6007492.31 687653.34 10865.00 13.60 MWD 15059.27 94.83 355.70 9055.76 9009.26 8832.31 6403.89 6007521.67 687649.61 10888.25 10.59 MWD 15090.73 95.94 0.99 9052.80 9006.30 8863.61 6402.98 6007552.93 687647.94 10914.21 17.1 f MW D 15119.95 94.68 4.17 9050.10 9003.60 8892.67 6404.29 6007582.02 68764$.55 10939.45 11.66 MWD 15154.18 93.72 7.45 9047.59 9001.09 8926.63 6407.75 6007616.05 687651.18 10969.99 9.96 MW D 15181.62 93.78 8.95 9045.79 8999.29 8953.73 6411.65 6007643.23 687654.42 10994.97 5.46 MWD 15215.07 92.86 11.45 9043.86 8997.36 8986.59 6417.57 6007676.23 687659.53 11025.90 7.95 MWD 15244.09 90.43 13.27 9043.02 8996.52 9014.92 6423.78 6007704.70 687665.05 11053. f 5 10.46 MW D 15276.58 89.48 16.54 9043.05 8996.55 9046.31 6432.13 6007736.28 687672.64 11084.14 10.48 MWD 15303.24 89.91 14.18 9043.19 8996.69 9072.02 6439.19 6007762.15 687679.08 11109.63 9.00 MWD 15331.54 91.23 10.88 9042.91 8996.41 9099.64 6445.33 6007789.91 687684.54 11136.25 12.56 MWD 15360.08 92.64 7.57 9041.95 8995.45 9127.79 6449.90 6007818.16 687688.43 11162.48 12.60 MW D 15390.08 92.76 4.40 9040.53 8994.03 9157.59 6453.03 6007848.03 687690.83 11189.32 10.56 MWD 15419.86 91.72 359.52 9039.37 8992.87 9187.32 6454.05 6007877.77 687691.12 11214.98 16.74 MW D 15449.52 89.32 354.72 9039.10 8992.60 9216.93 6452.56 6007907.33 687688.92 11239.19 18.09 MWD 15479.99 88.49 349.36 9039.68 8993.18 9247.09 6448.34 6007937.38 687683.97 11262.41 17.80 MWD 15510.07 88.00 344.25 9040.60 8994.10 9276.35 6441.48 6007966.47 687676.40 11283.46 17.06 MWD 15540.09 89.42 341.66 9041.28 8994.78 9305.04 6432.6$ 6007994.93 687666.91 11302.99 9.84 MW D 15569.37 89.57 344.96 9041.54 8995.04 9333.09 642427 6008022.76 687657.82 11322.17 11.28 MW D 15599.63 89.39 347.95 9041.81 8995.31 9362.50 6417.19 6008051.99 687650.03 11343.23 9.90 MW D 15630.66 86.89 351.64 9042.82 8996.32 9393.01 6411.69 6008082.36 687643.79 11366.06 14.36 MWD 15660.39 85.70 355.43 9044.74 8998.24 9422.49 6408.35 6008111.74 687639.74 11389.17 13.34 MWD 15690.15 86.99 358.79 9046.64 9000.14 9452.14 6406.86 6008141.35 687637.52 11413.42 12.07 MWD 15720.85 87.27 2.88 9048.18 9001.68 9482.80 6407.30 6008172.00 687637.22 11439.55 13.34 MWD 15752.41 84.59 5.53 9050.42 9003.92 9514.19 6409.61 6008203.44 687638.77 11467.30 11.93 MW D 15782.48 84.04 8.75 9053.40 9006.90 9543.87 6413.33 6008233.21 687641.76 11494.37 10.81 MW D 15812.75 84.77 11.56 9056.35 9009.85 9573.52 6418.64 6008262.97 687646.35 11522.26 9.55 MW D 15843.15 85.54 7.84 9058.92 9012.42 9603.38 6423.74 6008292.94 687650.73 11550.21 12.45 MW D 15872.96 87.97 5.23 9060.60 9014.10 9632.94 6427.13 6008322.58 687653.40 11576.99 1 f .95 MW D 15908.28 88.13 359.43 9061.81 9015.31 9668.19 6428.56 6008357.85 687653.97 11607.54 16.42 MWD 15942.79 88.14 355.79 9062.93 9016.43 9702.65 6427.12 6008392.26 687651.70 11635.88 10.54 MWD 15972.90 85.58 350.32 9064.58 9018.08 9732.48 6423.49 6008421.99 687647.34 11659.13 20.03 MW D 16003.60 87.11 347.31 9066.54 9020.04 9762.53 6417.55 6008451.89 687640.67 11681.34 10.98 MW D 16041.09 86.28 343.78 9068.70 9022.20 9798.77 6408.21 6008487.89 687630.46 11706.95 9.66 MW D 16073.26 89.01 340.85 9070.02 9023.52 9829.39 6398.45 6008518.26 687619.95 11727.58 12.44 MWD 16100.94 88.03 335.57 9070.74 9024.24 9855.07 6388.18 6008543.68 687609.07 11743.78 19.39 MWD 16130.06 90.98 331.41 9070.99 9024.49 9881.12 6375.19 6008569.41 687595.45 11758.83 17.51 MW D 16160.14 90.28 328.08 9070.66 9024.16 9907.10 6360.03 6008595.01 687579.67 11772.67 11.31 MW D 16190.40 85.54 323.94 9071.76 9025.26 9932.16 6343.14 6008619.65 687562.17 11784.79 20.79 MWD 16236.00 85.54 323.94 9075.31 9028.81 9968.91 6316.38 6008655.74 687534.53 11801.52 0.00 MW D l~v~L L~ --___~_ ~ Ti~®4/~Sf~l/T'~~4L ,_ ~- - ProActive Diagnostic Services, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hoie/Mechanical Logs and/or Tubing Inspection(Caliper/ MTTj The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fa~c (907) 245.8952 1 j EDE Disk P2 - 19A Coil Flag OS-Jun-07 2j 3j 4j ~ ~ ~- , 5j sj ~j Signed : s Print Name: e~'~.~'i~ ~~ ~$,~~1°~~a .~ ~. _ ~ ay y~vl.J d Date . ~~1 ~s i~;,'& -_~~ _ - 3 ,., PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8852 E-Ma1L ; ~ WEBSITE °,','F ..<~ it~l D:\Mas[~_Copy_00_PDSANC-20~oc\Z Wocd\Dismbution\Transmittal_Sheets\'1}ansmit_Onginal.doc 06/18/07 • Sehlumberer N0.4306 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 n~~"? ~,v~ ~ Alaska Oil 8 Gas Cons 1'omm Anchorage, AK 99503-2838 ~/ T Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well _Inh S 1 ..r. new :..~:.... n-.a., n~ n_.__ nr. L3-12 11695062 PRODUCTION PROFILE 06106/07 1 GNI-03 11637128 PRESSITEMP SURVEY 06/06/07 Y-11C 11661151 MEMORY INJECTION PROFILE 06/01/07 1 C-31B 11745223 MEMORY PROD PROFILE 05/31/07 1 05-30 11801067 LDL 06/01/07 1 13-29L1 11686753 LDL 05/28/07 1 Y-OSA 11628778 MEMORY INJECTION PROFILE 05/28/07 1 L5-23 11661153 MEMORY PROD PROFILE 06/05/07 1 H-37A 11594506 PPROFIIPROF 06/05/07 1 Y-35A 11661152 MEMORY PROD PROFILE 06103!07 1 N-15 11637129 PRODUCTION PROFILE 06113107 1 01-07A 11626098 PRODUCTION PROFILE 05/28107 1 13-29L1 11686753 LDL 05/28/07 1 04-24 11773112 PRODUCTION LOG 05/19/07 1 12-19 11637343 LDL 06/13/07 1 G-23A 11638639 LDL 06/03/07 1 14-05A 11813055 PPROF W/RST BORAX 06/11107 1 K-12A 11745224 MEMORY PROD PROFILE 06102/07 1 P2-19A 11661154 MEMORY PROD PROFILE 06/06107 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 3-411K-39 11813054 INJECTION PROFILE 06/08/07 1 3-41/K-39 11813054 INJECTION PROFILE 06/09/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 Z-13A 11649962 MEMORY PROD PROFILE 04/21/07 1 W-17A 40012333 OH EDIT MWDILWD 09/19/05 2 1 ~~..vr. .-.v....v ~~~~v.a~ ~~~v~~~ , cap .~~V~~~I~V MI\tJ nCl Vn1Y1tYV VIYC ~.lJ l'T CNV17 111: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 ; - , - , 900 E Benson Blvd. - Anchorage, Alaska 99508 Date Delivered: n 9~ ~~~~ e f 3 ~: ~ ~,, t~ ~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: • Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 saR.4w ~au~, Go~~~er~®R 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU P2-19A BP Exploration (Alaska), Inc. Permit No: 207-012 Surface Location: 44' FNL, 1226' FWL, SEC. 14, T12N, R14E, UM Bottomhole Location: 433' FNL, 1572' FWL, SEC. O1, T12N, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this ~ day of February, 2007 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ~~~ ALASKA OIL AND GAS CONSERVATION COMMI~N ~~ ~"~~ PER ITT RILL ~''t M OD 20 AAC 25.005 ®~~ ~„ `~ r-, 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory O Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if e ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas,~,q N ~ 6 2007 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single ell Bond No. 6194193 ~ 1 }, ell Name and Number: ~+fa°"a a1! "c~~# ~QO'i9~-iNllftti5siot! 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth;SS MD 17000' TVD 9061' 12. Field / Po OC8~8 Prudhoe Bay Field /Point 4a. Location of Well (Governmental Section): Surface: 44' FNL 1226 FWL SEC R14E UM 14 T12N 7. Property Designation: ADL 365548 ~ McIntyre Pool ~ , , . , , , Top of Productive Horizon: 2348' FNL, 2249' FWL, SEC. 01, T12N, R14E, UM ~ 8. Land Use Permit: 13. Approximate Spud Date: March 07, 2007 - Total Depth: 433' FNL, 1572' FWL, SEC. 01, T12N, R14E, UM ~ 9. Acres in Property: 2560 14. Distance to Nearest Property: 590' 4b. Location of Well (State Base Plane Coordinates): Surface: x-681476 y-5998537 Zone-ASP4 10. KB Elevation (Height above GL): 46.50 feet 15. Distance to Nearest well within Pool: 1050' 16. Deviated Wells: Kickoff Depth: 14520 feet Maximum Hole An le: 98.66 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 4130 Surface: 3233 1 G i Pr .ram: S i n To - in D h - Ba om uanti of C ment .f. r ks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1/8" 3-3116" X2aie~~ 6.2# / 6.16# L-80 TCII / STL 269 ' 14305' 8922' 17000' 9061' 150 sx Class'G' 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 15512 Total Depth TVD (ft): 9639 Plugs (measured): None Effective Depth MD (ft): 14675 Effective Depth TVD (ft): 9149 Junk (measured): None Casing Length ize Cement Volume MD D Conductor /Structural 11 20" Driven 11 110' Surface 69 9-5/8" 178 sx old a III 590 sx Class'G' 6984' 4958' Intermed+ate Pr i n 14687' 7" 460 sx las 'G' 1471 9175' Liner Perforation Depth MD (ft): 14416' - 14560' Perforation Depth TVD (ft): 8990' - 9079' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer Prepared By Name/Number: Si nature ,~.. ~/`- Phone 564-4387 Date ( '~ ~ Sondra Stewman, 56a-4750 Commission Use Onl Permit To Drill Number: oZO~ ~ API Number: 50-029-22765-01-00 Permit Ap royal Dae:~ See cover letter for oth r it ment Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes (~ No HZS Measures: Yes ^ No re nal Survey Req'd: ~ Yes ^ No Other: ~_Sd0 Qs~ 13. ~~~5~-- Z ~~Q ~ APPROVED BY THE COMMISSION Date .. ,COMMISSIONER Form 10-401 Revised 12/2005 ~ R ~ ~ ~ ~ A Lv V ~" Submit In Duplicate BP Point McIntyre P2-19A CTD Sidetrack CTD Sidetrack Summary Pre-Rig Work: 1. O MIT-OA and CMIT TxIA (both passed) Done 2. C Mill XN nipple then clean out to 14,500' -use 3.8" mill and left hand motor 3. C Underream whipstock setting area 14,400' to 14,500' 4. S Dummy GLV#1 5. S Rummy Baker dummy WS drift (3.7" x 17') to 14500'. ~ ' 3 ~ ~ ~ ®~ 6. S Caliper from 14500 7. O MIT-IA 8. E Set Baker 4-1/2" x 7" whipstock at 14520' highside. 9. C Squeeze 13 bbl of 15.8 ppg cement past WS to isolate perforations 10. O AC-LDS; AC-PPPOT-IC, T 11. O Install accumulator for TRSSSV 12. O Bleed gas lift and production flowlines down to zero and blind flange 13. O Remove wellhouse, level pad The pre CTD work is slated to begin on Feb 15th, 2006. Rig Work: 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mi113.8" window at 14,520'and 10' of rathole. Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 205' (45 deg/100 planned) 4. Drill Lateral: 4.125" OH, 2275' (12 deg/100 planned), with resistivity 5. Run 3-3/16" 2-7/8" solid liner leaving TOL at 14305' 6. Pump primary cement leaving TOC at 14305' 7. Cleanout liner and MCNL/GR/CCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions (700') 10. Freeze protect well, Set BPV, RDMO Post-Rig Work: 1. Move wellhouse, Install production flowline 2. Pull BPV 3. Run GLVs 4. Flowback well to separator Mud Program: • Well kill: 9.3 ppg brine • Milling/drilling: 9.3 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCII 14305' and - 15500' and • 2-7/8", L-80 6.16# STL 15500'md - 17000'md • A minimum of 31 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 14305' • Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 98 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 590 ft. • Distance to nearest well within pool - 1050 ft. (P2-14) Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole CNL/GR/CCL log will be run. Hazards • The maximum recorded H2S level at PM2 is 130 ppm • Lost circulation risk is minimal, 2 fault crossings expected. Reservoir Pressure • The max res. press. is estimated to be 4130 psi at 8975'ss (8.9 ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface is 3233 psi. TREE = 4-1%16"5M CHROME WELLHEAD = FMC ACTUATOR = BAKER C KB. ELEV = 47.6` BF. ELEV - KOP = 1381' Max Angle = 60 @ 3936' Datum MD = 14203' Datum ND = 8800' SS 9-5/8" CSG, 40#, L-80, ID = 8.835" ~-{ 6982' Minimum ID = 3.725" @ 14327' OTIS XN NIPPLE 7" CSG, 2s#, L-8o, ID = 6.276" ~~ 13530' P Z 19 NOTES: 7" CHROME CSG ~ 4-1 /2" • C OMETBG 2068' ~ 4-1/2" CAMCO BAL-O SVLN, ID = 3.812" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 1 5247 3996 59 KBG-2-LS DMY INT 0 12/07/06 2 8022 5501 59 KBG-2-LS DMY INT 0 3 9544 6307 58 KBG-2-LS DMY INT 0 12/07/06 4 10640 6889 57 KBG-2-LS DMY INT 0 5 11581 7410 56 KBG-2-LS DMY INT 0 6 12515 7912 57 KBG-2-LS DMY INT 0 7 14114 8794 54 KBG-2-LS DMY INT 0 8 14266 8884 53 KBG-2-LS DMY INT 0 14293' ~ 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 14316' 4-1 /2" OTIS X NIP, ID = 3.813" 14327' 4-1/2" OTIS XN NIP, ID = 3.725" 4-1/2" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" I~ 14339' PERFORATION SUMMARY REF LOG: SPERRY SUN GR-EWR4 ON 05/21/97 ANGLE AT TOP PERF: 52 @ 14416' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 14416 - 14446 S 06/27/97 3-3/8" 6 14424 - 14524 O 04/20/98 3-3/8" 6 14432 - 14452 O 02/16/01 3-3/8" 6 14470 - 14500 S 06/27/97 3-3/8" 6 14494 - 14507 O 02/16/01 3-3/8" 6 14540 - 14560 S 06/27/97 PBTD ~~ 1 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.184" I~ 14716' 14339' -j 4-1/2" TUBING TAIL, WLEG ~ 14329' ELMD TT LOGGED 06/14/97 DATE REV BY COMMENTS DATE REV BY COMMENTS 05/23/97 ORIGINAL COMPLETION 09/18/01 RN/TP CORRECTIONS 02/18/03 MS/tlh CORRECTIONS 06/17/05 RAGPJC CORRECTION TBG TAIL, WLEG 12/07/06 JLJ/TLH GLV GO POINT MCINTYRE UNIT WELL: P2-19 PERMff No: 1970790 API No: 50-029-22765-00 SEC14 T12N R14E 2649.36 FEL 1531.15 FNL BP Exploration (Alaska) TREE= 4-1/16"SMCHRnMF WELLHEAD= FMC ACTUATOR = BAKER C KB. ELEV = 47.6' BF. ELEV = KOP = 1381' Max Angle = 60 @ 3936' Datum MD = 14203' Datum ND = 8800' SS I 9-5/8" CSG, 40#, L-80, ID = 8.835" Minimum ID = 3.8" a~ 14327' OTIS XN NIPPLE ~ 7" CSG, 26#, L-80, ID = 6.276" ~ ~TOPOF3-1/2"LNR Top of Cement 3.5" X Nip 281" fG ~ 4-1/2" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" ~ P 2 -19 A SAFETY NOTES: 7" CHROME CSG ~ 4-1/2" Proposed CTD Sidetrack cHROMETeG 2068' 4-1/2" CAMCO BAL-O SVLN, ~ = 3.812" I 14305' I PERFORATION SUMMARY REF LOG: SPERRY SUN GR-EWR4 ON 05/21 /97 A NGL E A T TOP PERF: 52 @ 14416' Note: Refer to Production DB for historical perf data S¢E SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 14416 - 14446 S 06/27!97 3-3/8" 6 14424 - 14524 0 04/20/98 3-3/8" 6 14432 - 14452 O 02/16/01 3-3/8" 6 14470 - 14500 S 06/27/97 3-318" 6 14494 - 14507 O 02/16/01 3-3/8" 6 14540 - 14560 S 06/27!97 I PBTD I 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.184" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 5247 3996 59 KBG-2-LS DMY INT 0 12/07/06 2 8022 5501 59 KBG-2-LS DMY INT 0 3 9544 6307 58 KBG-2-LS DMY INT 0 12/07/06 4 10640 6889 57 KBG-2-LS DMY INT 0 5 11581 7410 56 KBG-2-LS DMY INT 0 6 12515 7912 57 KBG-2-LS DMY INT 0 7 14114 8794 54 KBG-2-LS DMY INT 0 8 14266 8884 53 KBG-2-LS DMY INT 0 14293' I- j 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 14316' 14327' 4-1 /2" OTIS X NIP, ID = 3.813" 4-1/2" OTIS XN NP, ID= 3 3" -~ 14339' 11 4-1/2" TUBWG TAIL, WLEG ~ 14329' ELMD TT LOGGED 06/14/97 14520' Mechanical V~mipstock 15500' 3-3116 x 2-7/8 X-over 3-3/16 X 2-7/8" cmt'ed and perfed 17000' DATE REV BY COMMENTS DATE REV BY COMMENTS 05/23197 ORIGINAL COMPLETION 09/18/01 RN/TP CORRECTIONS 02/18/03 MS/tlh CORRECTIONS 06/17/05 RAGPJC CORRECTION TBG TAIL, WLEG 12/07/06 JLJlfLH GLV GO POINT MC~JTY RE UNIT WELL: P2-19 PERMfr No: 1970790 API No: 50-029-22765-00 SEC14 T12N R14E 2649.36 FEL 1531.15 FNL t3P Exploration (Alaska) BP Al sk by a a Baker Hughes INTEQ Planning Report saw ~~ INTEQ Company: BP Amoco Date: 1/25/2007 Time: 10:49:54 Page: l Field: Point McIntyre Co-ordinate(NE) Reference: Well: P2-19, True North Site: Pt Mac 2 Vertical (TVD) Reference: P2-19: 46.5 Well: P2-19 Section (VS) Reference: Well (O.OON,O.OOE,345.OOAzi) Welipath: Plan 6, P2-19A Snrvey Calculation Mcthod: Mi nimum Curvature Db: Oracle Field: Point McIntyre North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: WeN Centre Sys Datum: Mean Sea Level GeomagneNe Modei: bggm2006 Site: Pt Mac 2 TR-12-14 UNITED STATES :North Slope Site Position: Northing: 5995140. 76 ft Latitude: 70 23 32.530 N From: Map Fasting: 674873. 98 ft Longitude: 148 34 37.934 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: P2-19 Slot Name: 19 P2-19 Well Position: +N/-S 3241.42 ft Northing: 5998537. 01 ft Latitude: 70 24 4.379 N +E/-W 6666.58 ft Fasting : 681462. 48 ft Longitude: 148 31 22.620 W Position Uncertainty: 0.00 ft Wellpath: Plan 6, P2-19A Drilled From: P2-1 9 change kop to 14520' from 14500'md Tie-on Depth: 14500.00 ft Current Datum: P2-19: Height 46. 50 ft Above System Datum: Mean Sea Level Magnetic Data: 1/24/2007 Declination: 24.17 deg Field Strength: 57667 nT Mag Dip Angle: 81.01 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.30 0.00 0.00 345.00 Plan: Plan #6 Date Composed: 1/24/2007 change kop to 14520' Version: 10 Principal: Yes Tied-to: From: Definitive Path Targets :..Map Map c^. Latitude __> <- Longitude -> Name Description TVD +N/-S +FJ-W Northing Easting Deg Min Sec Deg: Min Sec, Dip. Dir. ft ft ft tt tt P2-19A Polygon 46.50 10247.97 4888.16 6008900.02 686100.04 70 25 45.150 N 148 28 59.213 W -Polygon 1 46.50 10247.97 4888.16 6008900.02 686100.04 70 25 45.150 N 148 28 59.213 W -Polygon 2 46.50 10256.67 6588.97 6008950.02 687800.04 70 25 45.223 N 148 28 9.315 W -Polygon 3 46.50 9899.47 6880.40 6008600.02 688100.04 70 25 41.707 N 148 28 0.774 W -Polygon 4 46.50 8202.29 6739.14 6006900.02 688000.04 70 25 25.017 N 148 28 4.964 W -Polygon 5 46.50 8224.15 5839.35 6006900.02 687100.04 70 25 25.240 N 148 28 31.354 W -Polygon 6 46.50 9419.01 6068.45 6008100.02 687300.04 70 25 36.989 N 148 28 24.606 W P2-19A Faultl 46.50 8758.88 5652.27 6007430.01 686900.04 70 25 30.500 N 148 28 36.829 W -Polygon 1 46.50 8758.88 5652.27 6007430.01 686900.04 70 25 30.500 N 148 28 36.829 W -Polygon 2 46.50 8396.65 6973.94 6007100.01 688230.04 70 25 26.926 N 148 27 58.072 W P2-19A Fault 2 46.50 8617.94 5688.86 6007290.01 686940.04 70 25 29.114 N 148 28 35.759 W -Polygon 1 46.50 8617.94 5688.86 6007290.01 686940.04 70 25 29.114 N 148 28 35.759 W -Polygon 2 46.50 10490.98 6414.60 6009180.01 687620.04 70 25 47.529 N 148 28 14.424 W P2-19A Fautt4 46.50 9160.99 6806.45 6007860.01 688044.04 70 25 34.445 N 148 28 2.964 W P2-19A Fault 3 46.50 10497.06 6164.66 6009180.01 687370.04 70 25 47.591 N 148 28 21.757 W P2-19A Target 2 9026.50 9210.55 6413.51 6007900.01 687650.04 70 25 34.936 N 148 28 14.489 W P2-19A Target 3 9036.50 9810.41 6428.08 6008500.01 687650.04 70 25 40.835 N 148 28 14.046 W P2-19A Target 4 9066.50 9962.81 6331.75 6008650.01 687550.04 70 25 42.335 N 148 28 16.868 W P2-19A Targetl 9078.50 8391.23 6373.60 6007080.01 687630.04 70 25 26.878 N 148 28 15.680 W by BP Alaska Baker Hughes INTEQ Planning Report !-il`l~ Bps INTEQ Company: BP Amoco Date: 1/25/2007 Time: 10:49:54 Page: 2 Field: Point McIntyre Co-ordinate(NE} Reference: Well: P2-19, True North Site: Pt MaC 2 Vertical (TVD) Reference: P2-19: 46.5 Well: P2-19 Section (VS) Reference. Well (O.OON,O .OOE,345.OOAzi) Wellpath: Plan 6, P2- 19A Survey Calculation Method: Minimum Curvature Db: Oracle Targets Map Map < - Latit ude --> <-_ Longitude -> Name Description TVb +N/-S +E/-W Northing Easting Deg Min Sec Deg iVtin Sec Dip. Dir. ft ft ft ft ft P2-19A Target 5 9106.50 10230.97 5587.99 6008900.01 686800.04 70 25 44.978 N 148 28 38.682 W Annotation MD TVD R ft 14500.00 9041.87 TIP 14520.00 9054.12 KOP 14540.00 9066.13 End of 9 Deg/100' DLS 14635.86 9090.49 End of 45 Deg/100' DLS 14725.86 9078.96 5 14933.74 9055.47 6 15205.74 9035.22 7 15445.74 9027.06 8 15705.74 9030.77 9 15955.74 9037.49 10 16130.74 9055.75 11 16230.74 9067.99 12 16355.74 9076.07 13 16705.74 9095.14 14 1700.00 1688.27 TD Plan Section Information MD -Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft . deg/1008 deg/100ft deg/1OOft deg 14500.00 52.23 30.24 9041.87 8307.27 6330.13 0.00 0.00 0.00 0.00 14520.00 52.21 30.06 9054.12 8320.94 6338.06 0.72 -0.10 -0.90 261.94 14540.00 53.95 29.48 9066.13 8334.82 6346.00 9.00 8.70 -2.88 345.00 14635.86 96.00 19.23 9090.49 8417.50 6382.52 45.00 43.87 -10.69 345.00 14725.86 98.68 8.68 9078.96 8503.99 6404.04 12.00 2.98 -11.72 285.00 14933.74 94.10 344.00 9055.47 8708.46 6390.77 12.00 -2.20 -11.87 260.98 15205.74 94.21 16.73 9035.22 8976.02 6392.47 12.00 0.04 12.03 88.60 15445.74 89.61 348.27 9027.06 9213.14 6402.74 12.00 -1.91 -11.86 261.50 15705.74 88.79 19.47 9030.77 9469.33 6420.06 12.00 -0.32 12.00 91.70 15955.74 88.20 349.46 9037.49 9715.64 6439.29 12.00 -0.24 -12.00 268.50 16130.74 79.92 330.04 9055.75 9878.08 6379.60 12.00 -4.73 -11.10 246.00 16230.74 86.05 319.64 9067.99 9959.04 6322.51 12.00 6.13 -10.40 300.00 16355.74 86.58 304.62 9076.07 10042.47 6230.26 12.00 0.42 -12.02 271.50 16705.74 87.46 262.57 9095.14 10122.73 5898.13 12.00 0.25 -12.01 270.00 17000.00 87.92 297.91 9107.39 10174.17 5613.37 12.00 0.16 12.01 90.00 Survey MD Iael Azim 'SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg $eg ft ft ft ft ft' deg/100ft R deg 14500.00 52.23 30.24 8995.37 8307.27 6330.13 6006995.03 687588.62 0.00 6385.85 0.00 MWD 14520.00 52.21 30.06 9007.62 8320.94 6338.06 6007008.88 687596.22 0.72 6397.00 261.94 MWD 14525.00 52.64 29.91 9010.67 8324.37 6340.05 6007012.36 687598.12 9.00 6399.80 345.00 MWD 14540.00 53.95 29.48 9019.63 8334.82 6346.00 6007022.95 687603.82 9.00 6408.35 345.09 MWD 14540.63 54.22 29.39 9020.00 8335.26 6346.25 6007023.40 687604.06 45.00 6408.71 345.00 P2-19 14550.00 58.30 28.12 9025.21 8342.10 6350.00 6007030.32 687607.64 45.00 6414.34 345.05 MWD 14564.20 64.51 26.38 9032.00 8353.18 6355.70 6007041.54 687613.07 45.00 6423.58 345.76 P2-19 14575.00 69.24 25.18 9036.24 8362.12 6360.02 6007050.58 687617.17 45.00 6431.09 346,60 MWD 14600.00 80.22 22.64 9042.81 8384.14 6369.76 6007072.83 687626.37 45.00 6449.84 347.07 MWD 14625.00 91.22 20.26 9044.67 8407.31 6378.86 6007096.21 687634.91 45.00 6469.86 347.74 MWD 14635.86 96.00 19.23 9043.99 8417.50 6382.52 6007106.49 687638.32 45.00 6478.76 347.92 MWD 14650.00 96.44 17.58 9042.46 8430.84 6386.96 6007119.93 687642.43 12.00 6490.50 285.00 MWD 14675.00 97.20 14.66 9039.49 8454.68 6393.85 6007143.93 687648.74 12.00 6511.75 284.82 MWD 14700.00 97.94 11.73 9036.20 8478.81 6399.51 6007168.19 687653.81 12.00 6533.59 284.47 MWD by BP Alaska Baker Hughes INTEQ Planning Report ~.r s INTEQ Company: BP Amooo Dute: 1/25/2007 Time: 10:49:54 Page: 3 Field: Po int McIntyre Co-ordinate(NE) Referenc e: Well: P2-19, True North Site: Pt Mac 2 Vertica l (TVD) Reference: P2-19: 46.5 WeN: P2 -19 Sertiou (VS) Reference: Well (O.OON,O.OOE,345.OOAzi) Wellpath: Pla^ 6, P2-1 9A Sutvcy Cateulatioa Method: Minimum Curvature Db: Oracle Survey MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 14725.00 98.66 8.79 9032.59 8503.15 6403.91 6007192.63 687657.62 12.00 6555.96 284.09 MWD 14750.00 98.21 5.79 9028.91 .8527.67 6407.05 6007217.22 687660.17 11.97 6578.83 261.76 MWD 14775.00 97.71 2.81 9025.45 .8552.36 6408.91 6007241.94 687661.42 12.00 6602.20 260.56 MWD 14800.00 97.19 359.83 9022.21 8577.14 6409.48 6007266.73 687661.39 12.00 6625.99 260.15 MWD 14825.00 96.65 356.86 9019.20 8601.94 6408.76 6007291.50 687660.07 12.00 6650.13 259.76 MWD 14850.00 96.09 353.89 9016.42 8626.71 6406.75 6007316.21 687657.46 12.00 6674.57 259.40 MWD 14875.00 95.51 350.93 9013.90 8651.36 6403.47 6007340.77 687653.58 12.00 6699.23 259.07 MWD 14900.00 94.92 347.98 9011.63 8675.83 6398.91 6007365.13 687648.43 12.00 6724.05 258.77 MWD 14925.00 94.31 345.03 9009.61 8700.06 6393.10 6007389.20 687642.03 12.00 6748.96 258.51 MWD 14933.74 94.10 344.00 9008.97 8708.46 6390.77 6007397.54 687639.50 12.00 6757.67 258.27 MWD 14950.00 94.15 345.96 9007.80 8724.12 6386.57 6007413.10 687634.92 12.00 6773.89 88.60 MWD 14975.00 94.21 348.96 9005.98 8748.46 6381.15 6007437.29 687628.92 12.00 6798.80 88.74 MWD 15000.00 94.25 351.97 9004.14 8773.04 6377.02 6007461.77 687624.19 12.00 6823.61 88.96 MWD 15025.00 94.29 354.98 9002.28 8797.81 6374.19 6007486.46 687620.76 12.00 6848.27 89.18 MWD 15050.00 94.32 357.99 9000.40 8822.69 6372.66 6007511.29 687618.63 12.00 6872.70 89.41 MWD 15075.00 94.33 1.00 8998.51 8847.61 6372.44 6007536.20 687617.80 12.00 6896.83 89.63 MWD 15100.00 94.33 4.00 8996.63 8872.52 6373.53 6007561.12 687618.28 12.00 6920.60 89.86 MWD 15125.00 94.32 7.01 8994.74 8897.33 6375.92 6007585.98 687620.07 12.00 6943.95 90.09 MWD 15150.00 94.30 10.02 8992.86 8921.98 6379.61 6007610.71 687623.16 12.00 6966.80 90.31 MWD 15175.00 94.26 13.03 8990.99 8946.40 6384.60 6007635.25 687627.55 12.00 6989.11 90.54 MWD 15200.00 94.22 16.04 8989.14 8970.53 6390.85 6007659.53 687633.22 12.00 7010.80 90.76 MWD 15205.74 94.21 16.73 8988.72 8976.02 6392.47 6007665.05 687634.70 12.00 7015.68 90.99 MWD 15225.00 93.86 14.44 8987.37 8994.53 6397.63 6007683.68 687639.41 12.00 7032.22 261.50 MWD 15250.00 93.40 11.47 8985.78 9018.84 6403.22 6007708.12 687644.41 12.00 7054.26 261.34 MWD 15275.00 92.94 8.50 8984.40 9043.42 6407.54 6007732.80 687648.13 12.00 7076.88 261.15 MWD 15300.00 92.47 5.53 8983.22 9068.21 6410.59 6007757.64 687650.58 12.00 7100.03 260.99 MWD 15325.00 91.98 2.57 8982.25 9093.12 6412.36 6007782.59 687651.74 12.00 7123.64 260.85. MWD 15350.00 91.50 359.61 8981.49 9118.10 6412.83 6007807.58 687651.61 12.00 7147.65 260.73 MWD 15375.00 91.01 356.65 8980.94 9143.08 6412.01 6007832.53 687650.18 12.00 7171.99 260.64 MWD 15400.00 90.52 353.69 8980.61 9167.99 6409.91 6007857.37 687647.47 12.00 7196.59 260.58 MWD 15425.00 90.02 350.73 8980.49 9192.75 6406.52 6007882.05 687643.48 12.00 7221.39 260.54 MWD 15445.74 89.61 348.27 8980.56 9213.14 6402.74 6007902.34 687639.21 12.00 7242.06 260.52 MWD 15450.00 89.60 348.78 8980.59 9217.32 6401.89 6007906.49 687638.26 12.00 7246.31 91.70 MWD 15475.00 89.51 351.78 8980.78 9241.96 6397.67 6007931.02 687633.45 12.00 7271.20 91.70 MWD 15500.00 89.42 354.78 8981.01 9266.78 6394.75 6007955.76 687629.92 12.00 7295.94 91.67 MWD 15525.00 89.34 357.78 8981.28 9291.72 6393.13 6007980.66 687627.69 12.00 7320.45 91.65 MWD 15550.00 89.25 0.78 8981.59 9316.72 6392.81 6008005.63 687626.77 12.00 7344.68 91.61 MWD 15575.00 89.17 3.78 8981.93 9341.69 6393.81 6008030.62 687627.16 12.00 7368.54 91.58 MWD 15600.00 89.09 6.78 8982.31 9366.58 6396.11 6008055.56 687628.85 12.00 7391.99 91.53 MWD 15625.00 89.02 9.78 8982.72 9391.31 6399.71 6008080.37 687631.85 12.00 7414.95 91.49 MWD 15650.00 88.94 12.78 8983.17 9415.82 6404.59 6008104.99 687636.14 12.00 7437.36 91.44 MWD 15675.00 88.87 15.78 8983.64 9440.05 6410.76 6008129.35 687641.72 12.00 7459.16 91.39 MWD 15700.00 88.80 18.78 8984.15 9463.91 6418.18 6008153.39 687648.56 12.00 7480.29 91.33 MWD 15705.74 88.79 19.47 8984.27 9469.33 6420.06 6008158.85 687650.30 12.00 7485.04 91.27 MWD 15725.00 88.73 17.15 8984.69 9487.61 6426.11 6008177.28 687655.91 12.00 7501.13 268.50 MWD 15750.00 88.66 14.15 8985.26 9511.67 6432.85 6008201.49 687662.06 12.00 7522.63 268.55 MWD 15775.00 88.59 11.15 8985.86 9536.06 6438.33 6008226.00 687668.94 12.00 7544.76 268.62 MWD 15800.00 88.52 8.15 8986.49 9560.69 6442.52 6008250.73 687670.53 12.00 7567.47 268.69 MWD 15825.00 88.46 5.15 8987.15 9585.51 6445.41 6008275.61 687672.83 12.00 7590.70 268.77 MWD 15850.00 88.40 2.15 8987.84 9610.45 6447.00 6008300.58 687673.81 12.00 7614.37 268.85 MWD 15875.00 88.34 359.15 8988.55 9635.44 6447.29 6008325.56 687673.49 12.00 7638.43 268.93 MWD 15900.00 88.29 356.15 8989.28 9660.40 6446.27 6008350.49 687671.86 12.00 7662.81 269.01 MWD by BP Alaska Baker Hughes INTEQ Planning Report B$ INTEQ Company: BP Amoco Date: 1/25/2007 Time: 10:49:54 Page: 4 Field: Point McInty re Co-ord inate(NE) Reference: Well: P2-19, True North Site: Pt Mac 2 Vertical (TVD) Reference: P2-19: 46.5 Well: P2 -19 Section (VS) Reference: Well (O.OON,O.OOE,345.OOAzi) Wellpath: Plan 6, P2-1 9A Survey Calculation Method: Minimum Curvature Db: OraGe Survev MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 15925.00 88.25 353.15 8990.04 9685.28 6443.94 6008375.30 687668.93 12.00 7687.45 269.10 MWD 15950.00 88.21 350.15 8990.87 9710.00 6440.31 6008399.93 687664.70 12.00 7712.26 269.19 MWD 15955.74 88.20 349.46 8990.99 9715.64 6439.29 6008405.55 687663.55 12.00 7717.98 269.28 MWD 15975.00 87.26 347.35 8991.75 9734.50 6435.42 6008424.30 687659.22 12.00 7737.19 246.00 MWD 16000.00 86.05 344.60 8993.21 9758.71 6429.38 6008448.35 687652.59 12.00 7762.14 246.08 MWD 16025.00 84.85 341.84 8995.20 9782.56 6422.18 6008472.03 687644.82 12.00 7787.05 246.24 MWD 16050.00 83.66 339.07 8997.70 9806.00 6413.86 6008495.25 687635.93 12.00 7811.84 246.46 MWD 16075.00 82.48 336.29 9000.72 9828.96 6404.44 6008517.97 687625.96 12.00 7836.45 246.74 MWD 16100.00 81.32 333.50 9004.24 9851.37 6393.94 6008540.12 687614.92 12.00 7860.82 247.08 MWD 16125.00 80.18 330.69 9008.26 9873.17 6382.40 6008561.64 687602.85 12.00 7884.87 247.47 MWD 16130.74 79.92 330.04 9009.25 9878.08 6379.60 6008566.48 687599.93 12.00 7890.33 247.92 MWD 16150.00 81.08 328.01 9012.43 9894.37 6369.82 6008582.52 687589.76 12.00 7908.60 300.00 MWD 16175.00 82.61 325.40 9015.98 9915.05 6356.24 6008602.87 687575.68 12.00 7932.09 300.33 MWD 16200.00 84.15 322.81 9018.86 9935.17 6341.68 6008622.62 687560.64 12.00 7955.29 300.70 MWD 16225.00 85.70 320.23 9021.08 9954.66 6326.19 6008641.73 687544.68 12.00 7978.12 301.00 MWD 16230.74 86.05 319.64 9021.49 9959.04 6322.51 6008646.02 687540.89 12.00 7983.31 301.23 MWD 16250.00 86.12 317.32 9022.80 9973.43 6309.77 6008660.09 687527.81 12.00 8000.50 271.50 MWD 16275.00 86.21 314.32 9024.48 9991.31 6292.39 6008677.55 687510.00 12.00 8022.28 271.66 MWD 16300.00 86.31 311.31 9026.11 10008.27 6274.09 6008694.05 687491.30 12.00 8043.39 271.86 MWD 16325.00 86.42 308.31 9027.69 10024.24 6254.93 6008709.56 687471.75 12.00 8063.78 272.06 MWD 16350.00 86.55 305.31 9029.22 10039.19 6234.95 6008724.02 687451.42 12.00 8083.39 272.25 MWD 16355.74 86.58 304.62 9029.57 10042.47 6230.26 6008727.18 687446.65 12.00 8087.77 272.43 MWD 16375.00 86.58 302.30 9030.72 10053.07 6214.22 6008737.39 687430.36 12.00 8102.16 270.00 MWD 16400.00 86.59 299.30 9032.21 10065.85 6192.78 6008749.64 687408.62 12.00 8120.05 270.14 MWD 16425.00 86.61 296.29 9033.69 10077.49 6170.71 6008760.74 687386.27 12.00 8137.01 270.32 MWD 16450.00 86.64 293.29 9035.16 10087.95 6148.06 6008770.65 687363.37 12.00 8152.98 270.50 MWD 16475.00 86.68 290.28 9036.62 10097.21 6124.88 6008779.34 687339.99 12.00 8167.92 270.67 MWD 16500.00 86.73 287.28 9038.05 10105.24 6101.26 6008786.80 687316.17 12.00 8181.80 270.85 MWD 16525.00 86.79 284.27 9039.46 10112.03 6077.24 6008793.00 687292.00 12.00 8194.57 271.02 MWD 16550.00 86.86 281.27 9040.85 10117.55 6052.90 6008797.92 687267.53 12.00 8206.19 271.19 MWD 16575.00 86.93 278.27 9042.20 10121.78 6028.30 6008801.56 687242.84 12.00 8216.65 271.36 MWD 16600.00 87.02 275.26 9043.52 10124.72 6003.51 6008803.90 687217.99 12.00 8225.91 271.52 MWD 16625.00 87.11 272.26 9044.81 10126.36 5978.60 6008804.93 687193.05 12.00 8233.94 271.68 MWD 16650.00 87.21 269.26 9046.05 10126.69 5953.64 6008804.65 687168.08 12.00 8240.72 271.83 MWD 16675.00 87.31 266.26 9047.24 10125.72 5928.69 6008803.07 687143.17 12.00 8246.23 271.98 MWD 16700.00 87.43 263.26 9048.39 10123.43 5903.82 6008800.19 687118.36 12.00 8250.46 272.12 MWD 16705.74 87.46 262.57 9048.64 10122.73 5898.13 6008799.34 687112.70 12.00 8251.25 272.26 MWD 16725.00 87.46 264.88 9049.50 10120.62 5879.01 6008796.78 687093.63 12.00 8254.17 90.00 MWD 16750.00 87.47 267.88 9050.61 10119.05 5854.08 6008794.60 687068.75 12.00 8259.10 89.90 MWD 16775.00 87.48 270.89 9051.71 10118.78 5829.11 6008793.72 687043.80 12.00 8265.31 89.76 MWD 16800.00 87.51 273.89 9052.80 10119.82 5804.16 6008794.16 687018.83 12.00 8272.77 89.63 MWD 16825.00 87.54 276.89 9053.88 10122.17 5779.30 6008795.90 686993.92 12.00 8281.47 89.50 MWD 16850.00 87.57 279.90 9054.95 10125.81 5754.59 6008798.94 686969.13 12.00 8291.39 89.37 MWD 16875.00 87.61 282.90 9056.00 10130.75 5730.11 6008803.28 686944.54 12.00 8302.49 89.24 MWD 16900.00 87.66 285.90 9057.03 10136.96 5705.92 6008808.90 686920.20 12.00 8314.75 89.12 MWD 16925.00 87.72 288.90 9058.04 10144.43 5682.08 6008815.79 686896.20 12.00 8328.13 88.99 MWD 16950.00 87.78 291.90 9059.02 10153.14 5658.67 6008823.93 686872.58 12.00 8342.60 88.87 MWD 16975.00 87.85 294.90 9059.97 10163.06 5635.75 6008833.29 686849.43 12.00 8358.12 88.75 MWD 17000.00 87.92 297.91 9060.89 10174.17 5813.37 6008843.85 686826.79 12.00 8374.64 88.64 3.5 i • Q tl`~~ ,` it ~._,,, Ji r~F ~.I{ + r~ r'I I ~~ i i~t j t~ Il ~ ~ 11 _ i' a ~ ll~ri ~ ~, ~~~~ ~i1 ~t ~ II~~ ~~t~( ~I ~ ~ il~ f~It ~ {~I ~~. I~ ~~ . ~, ~ ,_ raaa ~i ~'i I# ~ 1ri ~~1 ~~ ~~ ~~C~ ~~t f~ ~ j ~. II ~~ ~~ ~~ ~ ~ ~ I ~ ~j In 11~ {.j , ~~ ~ ,i { i. I ~ It 1 ~ l~ ~ ~ ~, ~ ~.:~ a 1 ~ ~ + k f i I~ ~t ~. ~ I IC ~ I I II'~ ~ r ~ a l _ ~~~ [ryrye I ~-tr-~- -1~~-r 4t.~li-I 1,1111 { ~r-~- r ~1 If j 1~ 1 ~ I ~ ~ I~ ~ ~ e + ~ t... _{ ~ ~ } 4 I - 1 t I._ : .:. ~ !. .1. - I I ~.~ .. l I I l I. I I _ ~ j. I '~. II 444 _ .. ~ 1 t [r ~- __~ 1 I.- ~ ~~j tF~. ~~{ '` I ~''II ~~. .. j~ ~ I Ir 1~ ' I I ~ ~ I I f ~ F 7L r ~ rl rt +1 { ttt-~ }Ir ~_.1 1-, ~~ ~ ~~ ~ fC ~ ~ I ~i ~ f~I.1~~~ ~ ,~1t ~~* r,It ~~I ~~~' ~ ~1 ~ ,{~ ~ ~ '~~ l~~E jl~ ~. ~ ~ I ~ ! I ~I ~ ~ ~ ~ae~~ ~Fj-~ ~ r 1 j'~': I ~` j ~l~ +' { j '_:..I 1 f~ ~{' 1 ~ , --} { ~ ~ I~ _ t k j : ! ~ ; , I t t ~` ~ I ; ' ~"g 8 r 11 ,I ~rj~ ~~ I! { 1 ~ ~ 11 t t ~ ~1 1~a ~ I ! ~ jt $ l ~5 ~~ ~ fit iii ~f1 {~ it; ~I~~ ~~ ? i,l~ ~i}~ ~j~ kl~'' ~ r1 X11 ~~~;~~ i $ ~ ~+ ~ ~ t r ~.! (7111 1 f It j' ~ I - ~_- $ -- -- ~ ~ 7 ~ ri } _ I ~ -r .r ~ ~ ~i . ~ r, r t s ~ ~ ~ ~ t 1 a ~ r ~ ~ ~ 3 ~ _";~ - I ~'_ ~- ~ =c ~-. ~ }z - -~ __ ~ ~ 1_ .~ ~; ~. ~. + I:rl ~ tl ~ , t~ 1 +_ i ~~ "6 ,,1+ {1t j ~I i ~~ I ~ ~ I ~ - ~I 1 ~ ~~ ~s $i±t-r.. , +c }~~~ It ~ ~fl III. 1 4i'~.I~i {~ ij'.~1 11 ..1~ F+' _.. ~ t , +~ ! '4z t~ -° , ~ m 'rm= ~1 ~`` ~~ ~ {`' f+ i~ ~1 , ' ~ V' ~i~ ~' I li~}(( ;~ li ~~~ +~ I11 , ~ ~1 ~~ 1 + ~ ~_~t' t ~~ +i., t~ ~~: ~ ~ ~.~ .. I~{ 1-1~ I~~~ ~~ ~4i~ ~~ I ~I ,I~ ~ ,i ~ r t ~~ ~ f It ~] , i~-~ ~~ " Y ~t I ~ 1~ II. 1 +i FI 1~ 1 ~ ~T~ ~, ~ I t i a ~ .111 I _, ~lla ~ ~ r i ~ ,, I I~ 1 i' F I~I ~ ~ m ~ ~~ ,,i'r}I~~i !,-{ ~ tl ,F1t` ~~ ~'~ ijli _~~~ +~~ 1~ ~ ,.1 1~ ~~_ ~,~~ .~~ e I._ It~ Irt~~~?f k11~-±t tl`i ~~it f`ri }fl t+l~ {-I~ }11~ ~~I' Ittl !~'i Il~t 4~If t 1~ ~~ ~ 8 ~ ~ I1 r. ~ ~ ~ I ' _ a ~.. ~: ,:~ ,.~. „~, .:~... ~ ., ~,. ~ ~ ~,. ~., ,~. ,~.. ~.. ~, „~,...~„ ,~. ~ , , r _ , { . , 4 4 1 .1_F I~IRIOOZI (')41~NI(~141~5 I ~ ff - . 1 ~ ~ - ~ Ir 1#r ~ ~ 3~~FFFFFFF i I' i ~ - ~ i = r .. ~ 1 ~ ~I ~ •~ .'~ a'Ya~S~'8a I - - - - - - ~ asi :aaaaa as ~x~9aa~3e~ G aaBgFs4$~ I a I ~ l8 8i888a S4 388588 ~ f I I `L ~' A a k i a3i ~s ~ Y o~aaaesa~a _l - ~ .:. ~ ~ I ~ I tt I 1 i.t t LI t ~ I I:. L+~ r ~ ~Y ~ s ~ ~~ p~~ ~ ~ 8 8888888888888 ee~~~a~ I I 1 1111_. I ~ j I ~ I I, N ~ ~ ; 8 ~ • "a8aa :.ERSSa7~ pp asaassassa I I ~ ~~ 8 Y. ~ d ~ ~ ~ < Y~ ax. asBaaR:a 3 ~CCCCCCCfi { I I - I {- I ~ ~ ;Q ~ ~~ ~ s~~a3 ~ S iaa ~s ~ t I ~ P t1~ ~ Q ~ I ~~ y, g~ a s k ~ _ I ~ ~$ ~6 a o ~ ~~~a~ a ~ "a..s..s„sa $:a ~ ~ I / t 1 1 36 ~~ ,~Y ~ ~ ~~'dy ~~i~"SY~~~aSSi~S g9 f- - ~~ ~ : Il~t_ ~i I' -~ m ~~ a ~~~~U a as sa :aa" i ~~ ~ ; 1~1 ~ T + I a 3 sa ~~ ~ s 3 Y ~ ~ oezW } ` ~ r r ~, ' ~ _ sa a aas ,ec~ca= r I ~ ~ ~ ~~ {~ # ~ - ~ I ~ ~ .a 8 i 4 888aa •i•^•8 °z 888 2 i ..8 ~a~~ a~~~~~~m~~ s aria as ~ - I I Mews] u~deu i e~q~sen,i - - All Measurements are from top of Riser 1/24/2007 i ~_ ~ P2-19A bag BAG 7 1/16" 5000 psi. of bag of slips Blind/Shears _ TOTs 2 3/8" combi ram/slips ~ 71/16" 5ooopsi of pipes _, ~ ~ Mud Cross Mud Cross fiddle of flow cross ~ 7 1 /16" 5000psi fiddle of blind/shears variable bore pipe 3 1/2"-2 3/8" TOTs 2 3/8" combi ram/slips 7 1/16" 500opsi fiddle of pipe/slips , Flow Tee FW: [Fwd: P2-19A] i Subject: FW: [Fwd: P2-19A] From: "Endacott, Mary S" <Mary.Endacott@bp.com> Date: Tue, 06 Feb 2007 09:57:43 -0900 To: toiT~ i~~auncicr("~tadmin.state.ak.us CC: "Gantt. Lai~~ar L" <larnar.~~'~tntt~cr'hp.com>, "ti~lcLati~hlin. Sian M" =Scan.McLau'~hlin~crb~~.c~~m- , "lV~~rthin~~ton, Arcs J" ~~:~ras.~~-ortlungtomcbp.cc~m~= Hi Tom Our typical CTD liner is 3 1/2" x 3 3/16" x 2 7/8". With only a few joints of 3 1/2" at the top so the schematic is referring, only to the top few joints. See attached example. Mary -----Original Message----- From: Worthington, Aras J Sent: Tuesday, February 06, 2007 9:06 AM To: McLaughlin, Sean M; Gantt, Lamar r.,; Endacott, Mary S Subject: FW: [Fwd: P2-19A] -----Original Message----- From: Thomas Maunder [mailto:t~:am maur_der~admin.st:ate.a~>.l.~s] Sent: Monday, February 05, 2007 5:30 PM To: Worthington, Aras J Subject: [Fwd: P2-19A] Aras, Would you forward. this to Lamar or Mary. I don't seem to have their eddresses (yet). I got a bounce back from Sean. Thanks, Tom Maunder, PE AOGCC -------- Original Message -------- Subject: P2-19A Date: Mon, 05 Feb 2007 17:15:25 -0900 From: Thomas Maunder <tom mau°~der~admir_.state.ak.us> Organization: State of Alaska To: Sean McLaughlin <Sean.McLauarilin~abp.com> Sean, I am reviewing the 401 for this well and have a couple of questions. 1. The liner size given on the 401 and text is 3-3/16 x 2-7/8, however on the drawing the size shown is 3-1/2". Is there a typo? Thanks, Tom Maunder, PE AOGCC !Content-Description: Big Hole Liner configuration.gif -Big Hole Liner configuration.gif' Content-Type: image/gif Content-Encoding: base64 1 of 1 2/7/2007 7:37 AM ' Alaska Department of Natural~ources Land Administration System • w4 r~:;"ska 7.13 - ~ ~r:ci ~.... ;; ... r.;`~~~ PI is h_,~: ",7~ ' ~ ,-:~r~~ S#a?F Gabins Page 1 of 3 ~latur~ R~s~~rces Alas Case mark File Type. au~ File Number: 365548 ~ printable .C..ase File_Summary See Township, Range, Section and Acreage? New Search ~' Yes ~"' No _.___ _._ LAS Menu I Case Abstract l Case Detail I Land Abstract - ~A~ Pile: ADL 365~~5 ''''''~' .~ cif 0l 30%~00 Custorner.~ 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISS/APPRV/ACTV RUTH Status Date: ] 1/27/1985 Total Acres: 3601.100 Date Initiate d: 07/26/1985 Office of Primary Responsibility: DOG DIV 0[L AND GAS Last Transactio n Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transactio f~: AA-NRB ASSIGNMENT APPROVED Meridian: U 7otit~ir~{up: Ol2N Ruft~~: 014E .~c~~~tiun: 01 Sc~clron:9crrs.~ O Search Plats ~ll~~ridian_ lJ Iuii-r~shri~: O]`'V' 12cxn,~~c~: 014E .ti'cc~i~n~: 11~' Sr~clrunAcf~e.e: 0 llrri~lrun: l.~ %ula~n.~~hij~: 01 ~~ Rcan,~rc: 014E; Section: I l J'c~~7run Flcr~~~~: 0 1 /c~i•ic~iun: U 7~nrn.chi~~: U I ~N Ran;~~~: 0141: Section: l 2 .S~c~c°tir~ir Acrcrs.~ 0 LIc°riclicrrt~ 11 Township: O1?N I:~1~t~r: OI~E ,S~e~~~ti<~fi: U6 .5~~rcli~~n.4crts: 0 Search Picts L~~e1'IC/lall.~ ~ TUlPn.~'/11~): ~~ ~~ 1Zal1~C.~ O1 ~E ~~~~'C/lUn.~ O i .~~~C'f(U71 _-~CP['S': ~) ll~f'1'J(/1C!/'1: ~_- TU1611~'/11~7: ~) ~ i~ izUl]<~t': O]4E_ ,~'c'c'lJ~~/1.' i i .~~PC'I!!)ri AC'/'L'1': ~) Search Plats .t-~iri~ulr~u~: U l uw~ns/~rh: O I ;~~ Runk>r: O 1~ L S"cruc,~t.~ ~-1 .S~°clinn .~lrrc~.c.~ f) .11~r•.clian: ~! Tu~rn.ehit>: O1 ,A Run,~~c~: 014E S'cz~Iiun: ~~ S'c~c~iurr.Irf~c.~~: 0 Meridian: l l Yrncu~~hi~~: Ol A lccn~~c: 0141: S~i;ILUI'1: 3fi .~'c~~~lrun _tcrc~~~: 0 Legal Description 07-26-198 *'~` * SALE LEGAL DESCRIPTION TRACT =15A - ~l8 http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=365548... 1 /30/2007 ~' ~ Alaska Department of Naturasources Land Administration System Page 2 of 3 • T. 12 N, R. 1 ~ E., UMIAT MERIDIAN, ALASKA T. I2 N., R. 19 E., UMIAT MERIDIAN, ALASKA T. 13 N.. R. 14. E. , UMIAT MERIDIAN, ALASKA A PORTION OF BLOCK 605 AS SHOWN ON THE 'ZEASING AND NOMINATION MAP" FOR THE FEDERAL/STATE BEA UFORT SEA OIL AND GAS LEASE SALE, DATED 1/30/79, MORE PARTICULARLYDESCRIBED AS FOLLOWS.' THOSE LANDS IN BLOCK 60~ LYING NORTHERLY OF THE NORTH BOUNDARY OF SECTION 3, T. 1? N., R. 14 E., U.M. AK. (IDENTICAL WITHLINE 9-5 ON BLOCK 605) AND LYING EASTERLYOF THE WEST BOUNDARYOF SECTIONS 2 AND 11, T. 12 N., R. 19 E., U.M., AK (IDENTICAL WITHLINE 5-6 ON BLOCK 605) AND LYING NORTHERLY OF THE SOUTH BOUNDARYOF SECTION 11 AND 12, T. 12 N., R. 19 E., U.M., AK, AND LYING NORTHERLY OFTHE SOUTH BOUNDARY OF SECTION 7, T. 12 N., R. IS E., U.M., _AK ("IDENTICAL WITH LINE 6-7 ON BLOCK 60~), WITHIN THE OFFSHORE THREE-MILE ARC LINES, LISTED AS STATE AREA ON THE "SUPPLEMENTAL OFFICL4L O.C.S. BLOCK DIAGRAM) APPROVED 12/9/79, CONTAINING 1957.32 HECTARES. THIS TRACT CONTAINS' 3601.10 ACRES, MORE OR LESS. 10-13-99 ~` * * PRUDHOE BAY UNIT EXPANDED AND PT. MACINTYRE PARTICIPATING AREA ESTABLISHED ENTIRE LEASE LEGAL DESCRIPTION COMMITTED TO PB U AND PT MACLVTYRE PA. Last updated on 01/30/2007. Not sure who to contact? Have a question about DNR? Visit the ~?ublic Inforrr~ation tenter. Report technical problems with this page to the 4Nei~rnast~r. Site optimized for Netscape 7, IE 6 or above. This site also requires that all ~JC7I~ must be accepted. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=365548... 1 /30/2007 Sondra D. Stewman ss-si,z52 15~ BP Exploration AK INC. °Mastercard Check" PO Box 196612 MB 7-5 'Anchorage, AK 99519-6612 DATE ~ ~ l.~.~~ V~ PAY TO THE /~ ~'~ ORDER OF ~__~ ~r ~ ~ $ , ~~ ~-------.• n* ._ First National~6ank Alaska Anchorage, AK 99501 ~" ~z i~~ MEMO- DOLLARS ~. ~:L25200060~:99L46227L56411' 054 • • TI2A~'S~IIT~'aI. L~~'TER ~~IEC'ICLI~T `~~ELL d ~:vIE P8!/ P~ »~ PT®# ao~- olio ®evelopment Service Exploratory Stratigraphiic Vest von-Conventional ~~"el! Circle :appropriate Letter !Paragraphs to be Included in Transmittal Letter CHECK :ADD-Otis w~HAT ~; (OPTIO'.~iS) APPLIES =~'iL'LT[ LATERAL (If last two digits in :API number are beRveen 60-69) TEXT FOR APPROVAL LETTER The permit is for a new wellbore segment of existing wel I Permit tio. , API ~o. ~0- - Production should continue to be reported as a function of the original APf number Mated above. PILOT HOLE fn accordance with ZO .-SAC 2~.00~(t1, all records, data and logs ' acquired for the pilot hole must be clearly differentiated in both well name ( PH) and AP( number [ ~0- - -_~ from records, data and togs acquired for well SPAC[ivG 'The permit is approved subject to full compliance with ?0 AAC EXCEPTIOti 2~.0>j. Approval to perforate and produce 'inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY" D[TCH `Alf dry ditch sample sets submitted to the Commission must be in SA1.fPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and l0' sample intervals through target zones. Please note the following special condition of this permit: lion-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Com~anv tiame) has designed and implemented a water well testing program to provide baseline data i on water quality and quantity. Com anv Name must contact the Commission to obtain advance approval of such water well testing program. Re~~ I ?5.06 C'jody`tran;mittal ;.heckfi;t • m o- ~~ ; ; , ~o ; ~ , : ~ N 3' ~ ~ ~ I O . N ~, m, a. . , o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ° ~~ rn m ~ ~ ~ c. ~, L I ~ ~ ~ ~ i _ v >, - : o ~ w D ~ a. ~ y, L c: O , a as N, c E O ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~~ ~~ ; ~ ~~ a ~ a. a ~ °, fl L' : a ~' ~' , 3 oi, : ~ c. c c. a. a. o: ~ m. . c, ~ , ~ ~I : a ~ ~ ~ ~ ~ ~ ~ ~n c w, ~~ °~ ~ ~ ~ ° o, ~ O w, : : -+ O' y y, .~ y' N N o O' U 2 ~~ O ~ ~ ~ ~ ... N N E O' d' d.. ~ ~ ~ ~ ~, L ~ T N, M 'a d'. O ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ C• O: ~~ ~ y. ~, a• ~, ~ M• ~ N, ~ ~ ~ ~ ~~ Opp ~ ~ ~ ~ ~ ~ ~ ~ N• •-~ •-: y. ~ t. L, f6. a: ~ ~ ~ f6 O ~ ~ ~ ~ CO, iA m ~ ~ ~ ~ ~ ~ ~ o o m 'y a o c _: D a;, t: QO N ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ c N~ ,N ,y ~~ C ~ a ~ O. ~ ~ : D: '3~ X' N. ~ ~ ~ ~ ~ U' ~ c ~ N' ~~ ~ ~ ~ f6' Z Q ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ f0 f0 V: U ~~ ~ a M~ Y C ~~ >~ U: ~ y. ~ ~ U I N y~ N, y~ N, Vh y N, N, y~ N, y~ N, y~ y~ y~ N, N. N, VN VD N, N, y~ N, y N ~ Q, Q, ~ Q, O, y~ Q, Q. Q, Q, N, UA N, y y~ N, N, y~ y~ N, Q, N, y~ y~ y~ N, N, N, y~ y N, N, Q, ~ O, Q, y. Q, Q, N, a T ~' ~', ~, ~, ~ ~, ~, ~', ~, ~, ~-, ~", ~' z, z, Z, Z, Z, z; Z, Z, } ~ } ~ } }, Z } ~ } } } } } Z ~ ~ ~ Z z Z Z Y~ ~ ~~ ~ VV O, °, -~ a 3; ~ O. U C ~' O' _ _ 'O f6' 4T y~ fV~ U °: .O.' U ~ z , U , o o. ~ ~ c. ~ ~ ~ ca ~. ~ LL ~ I N y N ~ O 4 ; ~ ~, . ~ . ° ~ ; ~; v a' u~ ~, ~ ~: c N ~ ~: ~: N eo: w: a~ c o ~ ' ~ ~ ~ y~ ~ ~ '~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 3. ~~ . o. ~ ~ 3 o~ a ~ o; ; ~, o N ~ ~' a ~ ~ o, ~ ~ ° a ~. o, ~, °' a ~~ y m z I ~ ~ ~ ._~ v ~: OS ~ ~~ Z: W ~p a 3. ?~: m m N. O L.. ~ ~ ~~ C: ~ L: ~ m ~ C. y ', ~ 0~ M~ ~~ Q: W ~~ ~, ~ w ' o: c. a' °, o: ;c . . : ~ ~ c. m' . o. o, ~ o, ~ a L c' ~ o c: a a O _ ~ ~ ~ ~ ~ E E = ~~ c c ' E' ' ~ ° a'~~ N' o N' ~ c ,> ' p y' U ~ ~ a. w~ ~~ ~ C' d ~ y O N: +L-~~ o. o. ' ~ ~ rn ~ O Q ~~,I (~ ~ ~ N ~ O '~ O „ a O C U ~ O -° U a f6• N N 0 , C O• Q. , i 3 O. ~ 7 U m .4 Q• fl. _ N = o ~ O. w d . ~~ ~~ ~ ° ~ ~ >, y t/1 >. N' ~' Y ~ 'y ~ ~ g ~ ~ ~: o~ O o o c' T c O 7 7 o ~.- 'p (0 o, (6 ~ c~ a; o~ o Y f0 o~ m~ ia: O ~ Q~ (6' f6 ~ u~~ m~ ~ .O' a ~ O~ ~ °~ O' a~ .~ c d Q N, . ~ ^. C. C: ~ ~ , Q O' O~ O C~ ~~ . M ~' , - 7 C; O. O. ~' O' , .,, ~' 7• ~i' N' O' ~~ L (6' ~' !~' y' 3 (6, p a: ~~ :a (6. ~ ~ N t ~ .C ~ N a ' ~ N ~ O N N y M L y ` ~ N O fl'. ~~ ~ O~ C ~ O~ ~ ~ ~ Z . . ~. ~, N '~ , - ~, 3; . 3, a ~ ~, . : . ~ o . ~ ~ '~ °-~ o ~ , . ~ ~ . . ~ p~ ° o ~ ~ . ~ ~ o; 3; o, L, Z ~: O w V o O O ~ a; Q o• a ~ '~ a, ` a, ` o ° ~ a a~~ v ~ ~~ ~~ ~ ° ~ °~ '~: . . o~ c. I ' ~ : . ~, a~~ °' °' Y, , aai ° o ~ i, ' v y' a. ~~ a a a' ~' ~' .c°' °' o; ~ ~~ °: , ~ ~ c . H ~ m L' n ~ a' N, ~ m ~ a r O~ . a ~ ~~ ~~ ° Oi W ~: y, a Q c' ~~ ~~ ~, o, , N. U, ~ o: O. Q .0+~ ~~ -~ ~~ ~ ~~ ~~ ~~ ~ ~~ ~ U. ~ ~3~ N. ~: ryOj, 00. o ~~ C• L, U. N. E~ - O. O. N' N' 4 .y, N, f6 ._, C. y: ~ ~ f6 f6 (6, N• O ~ ~ T ~ Z y O. O. O .0.~ ~, C' C.. O. Q. N. ~~ T , N• N: N ~~ C, a• O ~-' C L7' °' N' C: C: ~~ 7 D: ~~ ~~ p. ~~ 0~ O N ~' _ ~, "J N f6' Q• a' - a' a U. ~ ~ c' y N, L: L: L -O. L+' ~ N• ~~ •y: N. N. >~ .~ ~ L. N ~ ~ y. U' U:I Q, G• gyp, a LL d X m ~: ~: ~: m. ~ m. ~ o. L c. c ~ . a; ~3, ~ ~ ca ~ ~ ~ o y o ~ _ 3 a o, y c -° o $ io: ~l c a> c: o, m f- w ~ °~' 'c' 3' v' m. a ~ a ~ ° ~' ~' o a~ m o ~ ~: € o ~ N : a' ~: o. c : o: _, ~, ~, o. ~ - a ~; ._ ~: -a. a~; ~ ? 3, ~ ' a E. v% , - ~ ~:I ~ : ~: ~: ~ ° c. , ~: J m E' ~; g -, - -~ ~ ~ ~ ° ~~ •~ n ° -: a~: o n °~ 3 a' m' - H~ ~ 'c , ~~ °S ~' ~' o d' d N ° ~~ o~ ~ i ~ Q , ~ ~~ Q, ~a~ ai Y ~, m; a~: c, °~' ~ °~ ~ °~ ~ m. ° ~ 4 " a~, 4 a~ a~ c m 3, °~' - ~ c ~, o. I ~~ c: `t~ 4 °, ~ ~' U ua ~: ~ a; ca ~ ~ a, ~ ._ ~ , o, O' O .o, °' °: ~ ; '' ; a~: ~u ~ ~a~ a1°i. o; ~ U c a~ ~, ' ~, ; ; --;O, ~, O,O.; d; U ,Q, d,Z U,a~,U,U, ; ~~, Q, ~ ; Q,-, m;m;U: ~, ~;~ a, m, tn,~,U, W n ~ N M V ~ CO h o0 O r- r ~ ~ ~ ~ N ~ ~ N N N O M M ? ~ (O 1~ O O U O _ ___._.__-_ r - _ .T __~ _ N N _ N _ _ N N N _ M M M_ _ 1 M__ M _ M M M U ~ r+ ~ ~ ~~ d p I a+ ~ C N ~ ~ ~ O M '. ~ 01 ~ ~ ~ ~ D O 01 y O w ~ r ~ ~ ~ ',. i _ N "= M `- y ° J N a + N ' t ~ i N O E J Xk ~ a ~ ' c Q g t o fl. cn U w o ~ Q a ~ ~ ~ a ~ ~ ~ aQ d Q w t7 CJ Well History File APPENDIX Information of detailed nature that is not C particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Wetl History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 07/09/28 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/04/20 1406851 01 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!! !!!!!!!! Remark File Version 1.000 !!!!!!!!!!! !!!!!!!! Extract File: ldwg.las --Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame -Well Information Block #MNEM.UNIT Data Type Information STRT.FT 14430.0000: Starting Depth STOP.FT 16236.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: P2-19A FLD FIELD: Point McIntyre LOC LOCATION: 70 deg 23' 32.530"N 148 deg 34' 37.934"W CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 20-Apr-07 API API NUMBER: 500292276501 --Parameter Information Block #MNEM.UNIT Value Description SECT. 14 Section TOWN.N T12N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF RKB Log Measured from FAPD.F 46.5 Feet Above Perm. Datum DMF KB Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 46.5 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 --Remarks (1) All depths are Measured Depths (MD)unless otherwise noted. c76'~-~~~ ~ tSS/~~ ~~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVD) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log. MWD is the PDC for this wellbore P2-19A. A block shift of -3.0957' was applied from 14459 ft.MD to TD. (8) Tied to P2-19 at 14455.00 ft.MD (8967.61 ft.SSTVD) (9) The sidetrack was drilled from P2-19 through a milled window in 7" casing. Top of window 14459 ft.MD (8971.92 ft.SSTVD) Bottom o f window 14467 ft.MD (8976.75 ft.SSTVD) (10) The resistivi ty data from 14467 to 14712 ft.MD ft.SSTVD) is MAD data. (11) The interval from 16204 to 16236 ft.MD (9026.48 ft.SSTVD) was not logg ed due to sensor bit offset at TD. MNEMONICS: GRAX -> Gamma Ra y MWD-AAPI [MWD] (MWD-API units) BOPS -> Rate of Penetration, feet/hour TVD -> Subsea T rue Vertical Depth, feet CURVE SHIF T DATA BASELINE, MEASURED, DISPLACEMENT 14315.8, 14312.8, ! -2.92383 14318.5, 14315.9, ! -2.58008 14319.7, 14318.5, ! -1.2041 14324, 1 4320.8, ! -3.26758 14327.1, 14324.2, ! -2.92383 14330.6, 14328.2, ! -2.4082 14331.9, 14329.4, ! -2.58008 14333, 1 4331.6, ! -1.37598 14337.4, 14335, ! -2.4082 14340.5, 14337.7, ! -2.75195 14341.3, 14339.8, ! -1.54785 14343.1, 14341, ! -2.06445 14344.8, 14342.4, ! -2.4082 14347.5, 14345.5, ! -2.06445 14349.2, 14348, ! -1.2041 14354.1, 14351, ! -3.09668 14355.3, 14352.7, ! -2.58008 14357.8, 14354.6, ! -3.26758 14359.6, 14357, ! -2.58008 14363.5, 14360.6, ! -2.92383 14366.6, 14364, ! -2.58008 14369.7, 14367.8, ! -1.8916 14372.3, 14369.9, ! -2.4082 14374, 1 4371.3, ! -2.75195 14374.9, 14372.3, ! -2.58008 14376.1, 14373.7, ! -2.4082 14378.1, 14375.9, ! -2.23535 14379.5, 14377.5, ! -2.06348 14380.5, 14379, ! -1.54785 14384.1, 14382, ! -2.06348 14386.8, 14384.9, ! -1.8916 14392.9, 14389.9, ! -2.92383 14395.1, 14392.9, ! -2.23535 14397.7, 14394.9, ! -2.75195 14399, 14396.6, ! -2.40723 (8976.75 to 9045.52 to 9030.77 • 14401.1, 14398.4, ! -2.75195 14402.5, 14399.9, ! -2.58008 14403.9, 14401.6, ! -2.23633 14407.3, 14404.9, ! -2.40723 14408.5, 14407.5, ! -1.03125 14410.6, 14408.7, ! -1.89258 14413.5, 14411.4, ! -2.06445 14416.4, 14414.2, ! -2.23633 14419.5, 14417.3, ! -2.23535 14425.6, 14424.3, ! -1.37598 14427, 14425.6, ! -1.37598 14429.8, 14428, ! -1.7207 14431, 14429.4, ! -1.54785 14435.4, 14432.3, ! -3.09668 14437.2, 14434.9, ! -2.23633 14437.8, 14436, ! -1.8916 14439, 14437.7, ! -1.37598 14442.5, 14439.2, ! -3.26758 14443.3, 14441.1, ! -2.23633 14444.6, 14442.7, ! -1.8916 14445.8, 14444.6, ! -1.2041 14447.6, 14446.4, ! -1.2041 14452.5, 14450.1, ! -2.4082 14454, 14450.9, ! -3.0957 14456.4, 14453.2, ! -3.26758 14457.6, 14454.4, ! -3.26758 14459, 14455.9, ! -3.0957 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 134 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN P2-19A 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN P2-19A FN Point McIntyre COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL MWD is PDCL for P2-19A n *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPS 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 100 Tape File Start Depth = 14450.000000 Tape File End Depth = 16233.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 113 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN P2-19A.xtf LCC 150 CN BP Exploration (Alaska) WN P2-19A FN Point McIntyre COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -------- CNAM ODEP GRAX ---------- GRAX ------------ GRAX ----------------- 0.0 ROPS ROPS ROPS 0.0 RACL RACL RACLX 0.0 RACH RACH RACHX 0.0 RPCL RPCL RPCLX 0.0 RPCH RPCH RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GRAX MWD 68 1 AAPI 2 ROPS MWD 68 1 F/HR 3 RACL MWD 68 1 OHMM 4 RACH MWD 68 1 OHMM 5 RPCL MWD 68 1 OHMM 6 RPCH MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 199 Tape File Start Depth = 14450.000000 Tape File End Depth = 16233.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape 5ubfile: 3 212 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/04/20 1406851 01 **** REEL TRAILER **** MWD 07/09/28 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~ r Tape Subfile 1 is type: LIS • M Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 14450.0000 97.8818 128.1903 -999.2500 -999.2500 -999.2500 -999.2500 14450.5000 71.3000 125.4000 -999.2500 -999.2500 -999.2500 -999.2500 14500.0000 61.3469 15.4402 3.0592 2.2125 1.8618 1.5165 14600.0000 54.9773 42.9598 7.0897 7.1259 6.4689 5.9226 14700.0000 83.0004 71.7410 5.8739 4.7520 4.8140 4.7901 14800.0000 103.3902 60.1801 5.7225 7.9833 8.6707 12.2798 14900.0000 48.4797 54.9375 4.2462 1212.5408 12.1512 15.6664 15000.0000 59.2188 47.7164 11.8762 10.0454 8.5530 7.6732 15100.0000 74.1590 45.6953 12.6989 7.2222 6.6482 5.5072 15200.0000 84.7016 22.8145 23.0022 10.6724 9.6022 8.4058 15300.0000 68.4367 61.0176 16.4310 11.6267 10.0660 9.6828 15400.0000 115.9996 83.8805 25.3780 12.8862 11.1206 9.9479 15500.0000 97.4305 46.4504 19.1200 10.7970 8.3009 6.5105 15600.0000 101.1793 161.7242 19.4266 10.3711 9.1920 8.1746 15700.0000 67.5758 72.0000 16.1389 9.4986 8.4114 7.3704 15800.0000 89.1305 37.6195 13.0205 10.3764 8.0273 6.5766 15900.0000 73.0793 52.9406 11.4778 9.5243 8.4157 8.0680 16000.0000 53.0000 56.2949 11.1109 8.5538 7.8837 7.5200 16100.0000 62.7398 69.9805 9.6589 8.0969 8.3661 10.1800 16200.0000 -999.2500 13.4020 3.1019 8.6346 7.5889 23.0442 16233.0000 -999.2500 -999.2500 -999.2500 -999.2500 ~ ~ -999.2500 -999.2500 Tape File Start Depth = 14450.000000 Tape File End Depth = 16233.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • M Tape 5ubfile 3 is type: LIS DEPTH GRAX ROP5 RACL RACH RPCL RPCH 14450.0000 70.3000 127.6000 -999.2500 -999.2500 -999.2500 -999.2500 14450.2500 65.9000 125.5000 -999.2500 -999.2500 -999.2500 -999.2500 14500.0000 84.7000 22.0000 5.1860 4.7170 4.6710 5.3050 14600.0000 73.7000 26.7000 6.4300 7.4420 6.5910 6.1030 14700.0000 76.7000 68.9000 5.8920 5.1920 4.9230 5.0140 14800.0000 108.9000 62.3000 6.8140 8.2500 8.2570 9.4920 14900.0000 42.5000 50.7000 4.2370 14.1580 13.6720 20.5270 15000.0000 56.1000 39.9000 9.3860 7.2200 6.7130 6.3720 15100.0000 82.9000 64.4000 14.9300 7.6960 7.4450 6.2170 15200.0000 66.9000 40.5000 28.4840 12.5400 10.4130 8.6660 15300.0000 68.8000 43.9000 18.8310 11.3350 9.5760 8.6260 15400.0000 106.8000 82.6000 27.5740 11.3980 11.6650 10.8400 15500.0000 91.1000 45.0000 20.4920 12.7670 10.1820 8.7110 15600.0000 126.8000 87.4000 22.4390 13.7430 10.5480 9.1590 15700.0000 75.0000 54.5000 16.2360 9.3370 8.1600 6.8680 15800.0000 79.0000 41.5000 12.5860 9.6130 8.1600 6.9860 15900.0000 61.2000 32.7000 11.8380 9.5390 8.6480 8.2880 16000.0000 56.7000 38.8000 10.8450 8.0570 8.7170 9.0830 16100.0000 68.7000 34.1000 9.9380 8.5500 8.7170 10.5870 16200.0000 -999.2500 8.8000 1.7920 2.2500 2.5510 4.1150 16233.0000 -999.2500 5.8000 -999.2500 -999.2500 • • -999.2500 -999.2500 Tape File Start Depth = 14450.000000 Tape File End Depth = 16233.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet ~ ~ Tape Subfile 4 is type: LIS