Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout199-028Samuel Gebert Hilcorp Alaska, LLC GeoTech Assistant 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 10/29/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL GPB 05-01C (PTD 199-028) PNC3D 09/14/2020 Please include current contact information if different from above. PTD: 1990280 E-Set: 34140 Received by the AOGCC 10/29/2020 Abby Bell 10/30/2020 ovzaito Schl~6er~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503da3a ATiN: Beth Well Job # N0.5478 Company: State of Alaska Alaska Oil b Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD .i •~. OS-01C AYKP-00062 RST 01/17/10 1 1 05-38 AVKP-00083 RST 01/22/10 1 ~ 1 12-05A 05-288 11963097 BBSK-00002 MCNL RST 06/02/08 01/20/10 1 1 1 1 nGVG~r~ ~~ JRl11Y~lY~i N~YU l~CI Vr~r'Ir1Y~i VIYC I~Vrr CX\rrl IV: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-t 900 E. Benson Blvd. Alaska Data & Consulting Services _. ,_ w __ ~1Flii;> , ~~i:;~~~; lE,i; b 199-028-0 PRUDHOE BAY UNIT Roll #1: Start: Stop Roll #2: MD 10145 TVD 09015 Completion Date: 05-01C 50- 029-20136-03 Start Stop 6/12/99 Completed Status: 1-OIL BP EXPLORATION (ALASKA) INC Current: T Name Interval c 9245 ~ 1 SCHLUM MCNL D 9299 ~ PDS GR/CCL D 9330J FINAL BH GR L GR-MD j FINAL 9150-10145 L GR-TVD '~'~'~ FINAL 8416-8930 L MCNLt~''''~ FINAL 6483-10092 6/9/99 R SRVY LSTNG~/ BHI 9100-10145 Sent Received CH 7/23/99 7/26/99 CH 9/14/99 9/14/99 OH 9/20/99 9/24/99 OH 9/20/99 9/24/99 OH 9/20/99 9/24/99 CH 2 7/23/99 7/26/99 OH 6/25/99 6/25/99 T/C/D D C Wednesday, May 02, 2001 Page 1 of 1 ua/zz/ZUOl lO:3§ FAX 907 fi§4 4264 BP EXPLORATION bp March 21' 2001 ~ 001 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 '(907) 561-5111 Julie Heusser, Dan Seamount, & Cammy Oechsli Taylor Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Fax 276-7542 Dear Commissioners: RECEIVED HAR 2 J 200 Alaslm Oil & Gas Cons. CommOn, on Re: Prudhoe-EOA, Pt. Mac, & Lisbume Well Work This listing is provided as req~uired under the terms of Conservation Order No. 341C (Rule 14) & Order No. 342. This is a list df well work tentativel~ scheduled for March 19 - 26, 2001: Well 05-18A Work Planned CTE PERFORATION CTE ADD PERFORATION 06-24A CT ACID STIMULATION WI DIVERTER 12-15 SAG HYDRAULIC FRACTURE TREATMENT 13-27A 16-23Ai NK-65i CT ADD PERFORATION W/WORK PLATFORM CHE~C~ CUT TUBING (PRE RIG ST) CTE ADD PERFORATION S-101 S-103 ADD PERFORATION INITIAL PERFORATION If additional data or scheduling information is needed, please call me at 564-5799 or E-mail me at raufpc @bp.com. Sincerely, ~ ~' _ Paul C. Rauf Technical Assistant, BPXA Alaska Drilling & Wells ', J' STATE OF ALASKA ' ::'~ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 72 feet 3. Address Explorato~ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2488' FNL, 4206' FEL, Sec. 32, T11 N, R15E, UM (asp's 698143, 5948981) 05-01C At top of productive interval 9. Permit number / approval number 236' FNL, 4200' FEL, Sec. 32, T11 N, R1 SE, UM (asp's 698083, 5951234) 199-028 At effective depth 10. APl number 50-029-20136-03 At total depth 11. Field / Pool 171' FNL, 4328' FEL, Sec. 32, T1 1 N, R15E, UM (asp'$ 697952, 5951294) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10145 feet Plugs (measured) Tagged PBTD @ 101 12' MD on 9/8/1999. true vertical 9015 feet Effective depth: measured 10112 feet Junk (measured) true vertical 8989 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 558 Sx PF 110' 110' Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710' Production 6812' 9-5/8" 2000 Sx Class G & 100 Sx PF II 6884' 6804' Liner 2445' 5-1/2" 171 sx C~ass G 9150' 8485' Liner 154' 3-1/2" 67 sx Class G 9150' 8485' Liner 3447' 3-1/2"/2-3/8" 72 bbls 17 ppg LARC 10142' 9012' Perforation depth: measured 10004'- 10012'; 10027'- 10042'; 10050'- 10082'. true vertical 8909' - 8915'; 8925' - 8936'; 8942' - 8966'. Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 6720' MD. RECEIVED Packers & SSSV (type & measured depth) 9-518" X 4-1/2" TIW HBBP-T PACKER @ 6664' MD. 4-112"HESHXOSVLNSSSV @ 510'MD. /~AR ~ 7 /O00! 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) ~aS~(a Oil &~ ~ _Gas Cons.- ,JC°rnm~ss'0~ Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 430 10088 0 - 585 Subsequent to operation 1149 10146 0 - 643 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '~7./¢~_~ ~~~~,~~ Title: DS 5 Surveillance Engineer Date March 20, 2001 Brian Carlson Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 05-01C '- DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 12/17/2000: 3/17/2001 - 3/18/2001: RIH & drifted to 9360' SLM (HAW). MIRU CTE. PT'd BOPE. RIH w/CTE conveyed perforating guns & did Icg tie in f/10075' - 9775'. Shot 23' of perfs as follows: Add Perforated 10004'- 10012' MD (Zone lB) Reference Log: MCNL 6/09/1999. Reperforated 10027'- 10042' MD (Zone 1 B) Used 1-11/16" carriers & all shots @ 6 SPF, random orientation, 60° phasing, & overbalanced press. POOH w/guns. ASF. RD CTE. Placed well BOL. Obtained a valid well test. Page 1 RECEIVED MAR 200! A/asEa 0ii & Gas Cons. Commission Anchorage AOGCC Lori Taylor 3010 Porcupine Drive Anchorage, AK 99510 Well Reference Data: Well No: 05-01C Field: Prudhoe Bay Unit County: North Slope State' Alaska Date- 09/20/99 API No: 500292013603 BHI Job#: i05263 Enclosed is the following data as listed below: Log Type Bluelines Navigamma USMPR ~DL/MNP DPR/~DL/~DP TOTALS: Log T~pe Navigamma USMPR ~DL/MNP DPR/MDL/MDP Bluelines 2" + 5" Measured Depth Logs Folded Sepias Rolled Sepias 1 2" + 5" True Vertical Depth Logs Folded Sepias Rolled Sepias 1 Mylar Film Mylar Film LAS Disks : Survey Listing ASCII Disks : LIS Tape Image File Disks :1 LIS Verification Report & Listings :1 Depth Shift Monitor Plot : Upon Receipt, Please sign and fax to: Baker Hughes INTEQ At~~~~ ,-,~:~ o 4 t999 Date: Alas.ka Oit & Gas Cons. Commi~ion ~omge I ELL L:OG .... TRiI MITTIIL. ,Active Diagnostic Services, Inc. To~ ARCO Alaska, Inc. AOGCC Lori Taylor RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Robert Richey POS, Inc. Mail Pouch 340112 Prudhoe Bay, AK 99734 ' ' LoG DIGITAL ' MYLAR / BLUE LINE DIGITAL WELL DATE TYPE DATA SEPIA PRINT(S) REPORT FILM Open Hole I I I 1 i ! Res. Eval. CH I I 1 5-01C 9-8-99 I Mech. CH 1 Caliper Survey I Signed ' Print Name: ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 Phone:(907)659-2307 Fax:(907)659-2314 E-mail: pdsprudhoe~NA800.net Website: wwwv.memorylog.com C :Wly Documents~Excel_Word_Documents\Distribution_FormsXArco_pb_form.doc Schlumberger NO. 12703 7/23/99 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-rN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL Sepia CD D.S. 3-31 99283 RST-SIGMA ~ ~ ~.H ~-~ 990704 I I 1 D.S. 4-23A 99280 CNTG ~ ~q...~c~ 990629 I I 1 D.S. 5-01C 99266 MCNL ~ ~ ~-[~" 990609 I I 1 D.S. 6-08A 99281 CNTG ~. ~ ~{~ 990628 I I 1 D.S. 12-27A 99265 MCNL ~. ~~ 990602 I I I ,,, ,,, SIGNE DATE: ~fla~ka Oil & Gas Co~ls. Plea~ ~ign and r~tum one ~opy of thi~ transmittal to Sherrie at the above addre~ or fa~ to (907) 561-8317. ~nan~ you. STATE OF ALASKA ALAS'~' OIL AND GAS CONSERVATION COMIV,~ION ~,~,j~_ "~' ~ ~ WELL COMPLETION OR RECOMPLETION REPORT AN 1. Status of well Classification of Service~W,~, I " Oil ~ Gas ~ Suspended ~ ~andon~ ~ Semico ~ 4Ia~ 2. Name of Operator 7. Permit Number '" '~ ~e ¢~.._ 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-20136-03 4. Location of well at suda~ 9. Unit or Lease Name ~ ................. ~ ] ~'~. Prudhoe Bay Unit 2488' FNL, 4206' FEL, SEC. 32, T11N, R15E, UM ~ CE:~,~PL~T~0~ At Top Producing lnte~al ~~]~ ~~~ ' lO. Woll.umbo, 236' FNL, 4200' FEL, SEC 32, TllN, R15E, UM 05-01C AtTotal Depth ~ ~~~ 11. Fieldand Pool 173' FNL, 4327' FEL, SEC 32, T11 N, R15E, UM ~. Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and ~e~ai~- RKB 72.3 feet~ ADL28326 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Su~. Or ~d. J15. Water Depth, if offshore 16. No. of Completions May31, 1999 June7, 1999 June 12, 1999 ~ N/A feetMSL 1 17. Tot~ Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Suwey ~20. Depth where SSSV set 21. Thic~e~ of Permafrost 10145' MD/9015' ~D 10106' MD /8984' ~D YES ~ No ~J 0510' feet MD 1900' (approx) 22. T~e Electdc or Other Logs Run 23. CASING, LINER AND CEMENTING RECORD SE~ING DEPTH MD CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEME~ING RECORD~ AMOUNT PULLED 20" 94¢ H-40 Surfa~ 110' 36" 558 Sx PF 13-3/8" 72¢ MN-80 Surfa~ 2710' 17-1/2" 5o74 Sx PF II 9-5/8" 40¢ / 47¢ N-80/S-95 Surfa~ 6884' 12-1/4" 2000 Sx Cla~ G & 100 Sx PF II 5-1/2" 17¢ L-80 6705' 9150' 6-3/4" 171 Sx Cla~ G 3-1/2" 9.2¢ L-80 8996' 9150' 4-3/4" 67 Sx Class G 3-1/2"/2-3/8" 9.3¢/4.6~ L-80 6695' 10142' 3" 72 bbls of 17 ppg ~RC 24. Pedorations open to Production (MD + TVD of Top and BoSom and 25. ~BING RECORD intewal, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 6720' 6664' 10050' - 10082' MD; 8942' - 8966' ~D; ~4 SPF 26. ACID, F~CTURE, CEMENT SQUEEZE, ~C. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Summaw for details) 27. PROD~TION TEST Date Fimt Production Method of Operation (Flowing, gas li~, etc.) June 18, 1999 Gas lift Date of Test Hours Tested Production for OIL-BBL ~S-MCF IWATER-BBL CHOKE SIZE I~S-OIL ~TIO I Test Pedod > Row Tubing Casing Pressure C~culated OIL-BBL ~S-MCF WATER-BBL OIL G~VI~ - APl (co~) 24-Hour Rate > 28. CORE DATA Brief description of litholo~, pomsi~, fractures, ~pamnt dips ~d pms~n~ of oil, gas or water. Submit ~m chips. * This 10-407 is submitted as directed per the 10-401 form approved April 14, 1999 (Permit ~9-28) Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. NAME Top of Sag River Sand Shublik Top of Sadlerochit Top of Zone 1 Base of Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 8988' 9034' 9103' 9938' 10082' TRUE VERT. DEPTH 8344' 8382' 8444' 8865' 8966' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. 31. LIST OF ATTACHMENTS Summary of 05-01C CT Sidetrack Drilling Operations + Survey. 32. I hereby certify that the following is true and correct to the best of my knowledge. Signed .~~ ¢ '_~/~v~ ~ Bruce E. Smith, P.E. ~c~F~ "~"~4/ql~ Tille AAI Coil Tubinq Drilling Supervisor Date INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21-' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 05-01C DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 5/28/1999: MIRU CTU. 5/29/1999: 5/30/1999: 5/31/1999: 6/01/1999: 6/02/1999: 6/03/1999: 6/04/1999: 6/05/1999: 6/06/1999: RU CTU. PT'd BOPE. RIH & killed well. Tagged up on 3-1/2" liner top tie back sleeve. Sheared off TIW Whipstock tray & left same @ top of 3-1/2" liner as fish. POOH. RU Slickline Unit. RIH w/3.65" LIB & tagged 8991' MD. POOH. Impression indicated Whipstock fell downhole. RIH w/2-1/2" LIB & tagged top of the Whipstock tray @ 9157'. POOH. RD Slickline Unit. A CTU Cement Plug was pumped to Plug & Abandon the lower wellbore prior to ST operations as follows: RIH w/CT & pumped KCL Water. Pumped 10 bbls of 17 ppg Neat Class G Cement, followed by 25 bbls of 17 ppg Class G Cement w/20 ppb aggregate, followed by 6 bbls of 17 ppg Neat Class G Cement to abandon the perfs located @: 9138'-9158' MD Reference Log: BHCS 8/29/1974. 9586'-9600' MD 9602'-9650' MD Placed 20 bbls of Cement behind pipe & attained a max sqz press of 1750 psi. Contaminated cement w/Biozan & jetted contaminated Cement f/the wellbore to 9120' MD. POOH w/CT. Left 500 psi on wellhead. WOC. WOC. RIH & tagged Top of Whipstock Tray @ 9151' MD. PT'd squeezed well to 1050 psi - lost 0 psi in 30 min. POOH. RIH w/BHA to BTM & commenced window milling procedure through the 3-1/2" & 5-1/2" liners. Milled window f/9151 to 9157' MD. Drilled ahead into FM to 9167' & POOH. RIH w/Crayola mill. Unable to enter window so POOH. RIH w/cut rite Crayola mill. Again unable to penetrate window w/mill so POOH. RIH w/parabolic diamond mill & tagged 9149.6'. Time drilled to 9155.6' (drilling break) & onto 9165'. Reamed/backreamed window interval. POOH w/BHA. RIH & drilled to 9189'. Swapped hole to FIo Pro. Performed LOT to EMW of 9.2 ppg. Drilled to 9305' & POOH. Drilled to 9338' & POOH. RIH & drilled to 9408' w/lost returns. Pumped 1% KCL Water. POOH w/BHA. RIH & drilled to 9558'. POOH. RIH & drilled to 9768'. Took gas influx & bullheaded to kill well. POOH w/BHA. RIH w/CT. Squeezed gunk pill. POOH w/CT. PT'd BOPE. RIH & cleaned out gunk f/7946' to 9360'. Lost all returns @ 9360'. Tagged BTM @ corrected 9790'. POOH. Performed CTU maintenance. RIH w/bi-centered bit & drilled to 9820'. POOH. RIH w/BHA. 6/07/1999: Drilled to TD @ 10145' MD & POOH. RIH & conditioned hole. Spotted LCM pill. PUH while laying in High Vis FIo Pro. Sidetrack Summary Page I 05-01 C DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 6/08/1999: 6/09/1999: 6/11/1999: 6/12/1999: Spotted 2nd LCM pill. Still encountering lost returns. POOH. Performed CTU maintenance. MU 3-1/2" x 2-3/8" liner. RIH w/liner & landed it @ 10142' MD. TOL = 6685'. Unstung & displaced liner to 2% KCL Water. POOH. Top of Liner @ 13120' MD. Unstung f/liner & reattached. Pumped 48 bbls of 17 ppg Latex Acid Resistive Cement to cement the liner in place. No returns. Contaminated Cement w/Biozan & jetted contaminated Cement f/wellbore to 10111' MD. POOH w/CT. RIH w/1-11/16" CNL./GR Memory tool & tagged Backdoor Flapper Valve @ 10106' MD. Logged well & POOH w/logging tools. RIH w/nozzle & tagged BTM. Displaced liner f/TD to liner top w/17 ppg mud. Bullheaded Crude down backside. Pumped 2 bbls Neat LARC, followed by 22 bbls of LARC w/20 ppb Aggregate for a liner lap squeeze. No squeeze pressure attained. PUH to 6500' MD. WOC. PT'd liner lap to 1500 psi - passed. Cleaned out liner & laid in new FIo Pro. POOH. RIH w/Perf guns & tagged BTM. Positioned guns @: 10050' - 10082' MD (Zone 1) Shot 32' of Initial Perforations in the 2-3/8" liner. Used 1-11/16" carriers & shot all Perfs @ 4 SPF, random orientation, & 0° phasing. POOH w/guns. ASF. FP'd well. RDMOL. Placed well on initial production & obtained a valid well test. Sidetrack Summary Page 2 8300- 8400 8500 8600 ~ ~ 8700 > 8800 I--- 8900 I 9000 ARCO Alaska, Inc. Structure : D.S. 5 Field : Prudhoe Bay Well : 5-01C, 50-029-20156-05 Location : Nodh Slope, Alaska <- West (feet)' East (f.et) -> 700 600 500 400 300 200 100 0 100 200 300 400 500 600 700 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ! _ ORIGINAL  Tie on L RECEIVED [ ~~ A~aska Oil & Gas Cons. Commission ted orage 9100 i I I I I I I I I I ' I I I I I I I ' I I I I I I I I I I I I I I I ' I 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 VerticalSeCtion (feet)-> Tie on Azimuth 505.00 with reference 0.00 S, 0.00 E from 5-01 -2600 2500 2400,,. 23O0 22oo A I 2100 2000 1900 1800 1600 1500 ARCO Alaska, Inc. D.S. 5 5-01C 5-01 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker ~{ughes INTEQ Your ref : 5-01C Our ref : svy173 License : 50-029-20136-03 Date printed : 23-Jun-1999 Date created : 23-Jun-1999 Last revised : 23-Jun-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 696997.000,5951440.940,999.00000,N Slot location is n70 15 52.977,w148 23 52.292 Slot Grid coordinates are N 5948981.100, E 698143.000 Slot local coordinates are 2489.13 S 1081.28 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. D.S. 5,5-01C Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : 5-01C Last revised : 23-Jun-1999 Measured Inclin Azimuth Subsea Depth Degrees Degrees Depth R E C T A N G U L A R Dogleg Vert G R I D C O O R D S C O O R D I N A T E S Deg/100ft Sect Easting Northing. 9100.00 27.49 3.89 8368.76 1762.40N 311.95E 4.81 698.25 698408.69 5950750.96 9166.00 31.60 7.00 8426.17 1794.77N 315.09E 6.64 713.25 698410.99 5950783.41 9210.00 40.10 16.50 8461.83 1819.87N 320.53E 23.04 722.35 698415.77 5950808.63 9232.00 44.80 22.70 8478.06 · 1.833.83N 325.54E 28.58 725.75 698420.41 5950822.72 9256.00 47.60 25.00 8494.67 1849.66N 332.55E 13.56 728.50 698427.01 5950838.73 9286.00 52.20 18.50 8514.00 1870.97N 341.01E 22.57 733.01 698434.90 5950860.25 9316.00 60.00 16.30 8530.72 1894.71N 348.42E 26.70 739.72 698441.69 5950884.18 9348.00 69.50 5.80 8544.39 1923.05N 353.85E 41.93 750.60 698446.38 5950912.65 9388.00 77.30 0.80 8555.82 1961.28N 356.02E 22.88 769.60 698447.55 5950950.92 9443.00 68.50 353.20 8571.99 2013,68N 353.36E 20.74 800.38 698443.51 5951003.23 9478.00 68.00 331.30 8585.10 2044.41N 343.54E 58.09 825.35 698432.89 5951033.68 9518.00 62.80 312.40 8601.87 2072.90N 321.31E 44.83 859.51 698409.93 5951061'58 9549.00 68.60 310.10 8614.63 2091.51N 300.07E 19.89 887.46 698388.21 5951079.63 9585.00 64.90 308.10 8628.83 2112.37N 274.42E 11.47 920.34 698362.02 5951099.81 9615.00 62.30 303.10 8642,18 2128.02N 252.59E 17.26 947.16 698339.79 5951114.88 9648.00 63.70 301.20 8657.16 2143.66N 227.69E 6.66 976.56 698314.49 5951129.86 9696.00 68.50 299.90 8676.60 2165.95N 189.91E 10.30 1020.39 698276.14 5951151.16 9742.00 65.00 296.30 8694.76 2185.86N 152.65E 10.47 1062.49 698238.37 5951170.09 9773.00 66.00 294.40 8707.62 2197.94N 127.15E 6.44 1090.44 698212.57 5951181.49 9798.00 64.30 295.50 8718.13 2207.51N 106.59E 7.89 1112.90 698191.77 5951190.52 9831.00 60.60 294.06 8733.39 2219.77N 80.03E 11.86 1141.86 698164.90 5951202.08 9849.00 59.10 291.10 8742.43 2225.75N 65.66E 16.48 1157.16 698150.38 5951207.68 9878.00 56.80 292.60 8757.82 2234.89N 42.85E 9.06 1181.27 698127.34 5951216.23 9914.00 53.60 292.70 8778.36 2246.28N 15.57E 8.89 1210.35 698099,77 5951226.89 9951.00 50.30 292.80 8801.16 2257.54N 11.29W 8.92 1239.02 698072.62 5951237.45 9986.00 47.50 295.40 8824.17 2268.30N 35.37W 9.76 1265.07 698048.27 5951247.57 10017.00 44.20 295.30 8845.76 2277.82N 55.47W 10.65 1287.11 698027.94 5951256.56 10045.00 43.00 296.50 8866.04 2286.25N 72.84W 5.21 1306.27 698010.35 5951264.53 10083.00 41.00 298.70 8894.28 2298.02N 95.37W 6.53 1331.58 697987.52 5951275.71 10100.00 39.00 298.30 8907.30 2303.23N 104.97W 11.86 1342.47 697977.78 5951280.67 10145.00 39.00 298.30 8942.27 2316.66N 129.91W 0.00 1370.69 697952.51 5951293.44 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 5-01 and SSTVD from RKB - MSL = 72.32ft. Bottom hole distance is 2320.30 on azimuth 356.79 degrees from wellhead. Vertical section is from wellhead on azimuth 303.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. D.S. 5,5-01C Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : 5-01C Last revised : 23-Jun-1999 Comments in wellpath MD SSTVD Rectangular Coords. Comment 9100.00 8368.76 1762.40N 311.95E Tie on 10145.00 8942.27 2316.66N . 129.91W Projected to TD Targets associated with this wellpath Target name Geographic Location SSTVD Rectangular Coordinates Revised 5-01 ehs 697970.000,5951095.000,999.00 8855.00 2117.82N 117.61W Il-Mar-1999 - _ .... STATE OF ALASKA ~---' - ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development~X RKB 72 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 Servia__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2488' FNL, 4206' FEL, Sec. 32, T11N, R15E, UM 05-01C At top of productive interval 9. Permit number / approval number 236' FNL, 4200' FEL, Sec. 32, T11 N, R15E, UM 99-28 At effective depth 10. APl number 50-029-20136-03 At total depth 11. Field / Pool 171' FNL, 4327' FEL, Sec. 32, T11 N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10145 feet Plugs (measured) Tagged PBTD @ 10106' MD (6/10/1999) true vertical 9015 feet Effective depth: measured 10106 feet Junk(measured)OF ISINA true vertical 8984 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 20" 558 Sx PF 110' 110' Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710' Production 6812' 9-5/8" 2000 sx Class G & 100 Sx PF II 6884' 6804' Liner 2445' 5-1/2" 171 Sx C~ass G 9150' 8485' Liner 154' 3-1/2" 67 Sx C~ass G 9150' 8485' Liner 3447' 3-1/2"/2-3/8" 72 bbls 17 ppg I_ARC 10142' 9012' Perforationdepth: measured 10027'-10042';10050'- 10082'. true vertical 8925' - 8936'; 8942' - 8966'. Tubing (size, grade, and measured depth) 4-1/2"12.6¢, Los0 Tbg @ 6720' MD. Packers & SSSV (type & measured depth) 9-5/8" X 4-1/2" TIW HBBP-T PACKER @ 6665' MD. 4-1/2" HES HXO SVLN SSSV @ 511' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation (shut in) Subsequent to operation 815 -1500 17 - 504 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ~ Daily Report of Well Operations .__X Oil __X Gas ~ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~¢~ ~'~,.~_~,,~_.,,._~¢'~ ~" ('")'/~" Title ARCO Engineering S ape rvisor D ate ~///~/-//~,,,~ Erin Oba Prepped by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE .... 05-01 C DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 9/08/1999: MIRU CTU & PT'd equip to 3500 psi. RIH w/pen' guns &shot 15' of Add Pen'orations @: 10027'- 10042' MD (Zone lB) Reference Log: MCNL 6/09/1999. Used 1-11/16" carriers & all shots @ 4 SPF, random orientation, 180° phasing, & overbalanced press. Did not tag BTM. POOH w/guns. ASF. RD. Returned well to production & obtained a valid welltest. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Robert Christenson,~ DATE: May 28, 1999 Chairman THRU: Blair Wondzell, ~1~~ FILE NO: aeple2gf.doc P. I. Supervisor 6[~67 FROM: John H Spaulding, (~), _~'~ SUBJECT: Petroleum Inspectc CTD BOPE Test Nabors 3S / Dowell ARCO DS-5-01 c PTD' 99-28 May 28, 1999: I traveled to ARCO's DS 5-01c to witness the BOPE Test on Nabors 3S / Doweil coiled tubing drilling rig. The AOGCC BOPE Test report is attached for reference. As noted on the test report the blind rams failed, these were rebuilt and retested after I left location. SUMMARY: I witnessed the BOPE Test on; Nabors 3S / Dowell, 1 failure, 6 hour test time. Attachment' aeple2gf.xls Not confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Coil Tubing Unit BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: Nabors / Dowefl Operator: ARCO Well Name: 5-01C Casing Size: Set @ Test: Initial X Weekly Rig No. 3S PTD # Rep.: Rig Rep.: Location: Sec. Other ;: .,~:': :TEST DATA DATE: 5/28/99 99-28 Rig Ph.# 659-5515 Steve Bradley Dave Duerr 32 T. 11N R. 15E Meridian Umiat BOP STACK: Coil Tubing Unit: Pipe/Slip Rams Pipe/Slip Rams Blind Rams Reel Isolation Valve Deployment: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Quan. Test Pressure P/F 250/3500 P 1 250/3500 P 1 250/3500 P 1 250/3500 P 1 250/3500 P 1 250/3500 P 1 250/3500 P 1 250/3500 F 2 250/3500 P 1 25O/35OO P 1 250/3500 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Quan. Pressure P/F 12 250/3500 P 32 250/3500 P I P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 4 @ 2200 avg. Functioned Functioned MUD SYSTEM: Visual Alarm MISC. INSPECTIONS: Trip Tank ok ok Location Gen.: ok Pit Level Indicators ok ok Housekeeping: ok Meth Gas Detector ok ok , Permit to drill: yes H2S Gas Detector ok ok " Standing Order Posted 2,900 P 2,000 P X minutes 17 sec. minutes 49 sec. Remote: X' Psig. y~s Well Sign ok Drl. Rig ok Hazard Sec. yes Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested '/9 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Blind rams failed, will be rebuilt and tested after the test. Distribution: orig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: John H. Spauiding Form Revised 2/20/97 L.G. aeple2gf, xls 612J99 ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 April 7, 1999 Bruce E. Smith, P.E. AAI Coil Tubing Drilling Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bav Unit 05-0 lC ARCO Alaska, Inc. Permit No: 99-028 Sur Loc: 2488'FNL, 4206'FEL, Sec. 32, T1 IN. R15E, UM Btmhole Loc. 242'FNL, 4098'FEL, Sec. 32, TI 1N, R15E, UM Dear Mr. Smith: Enclosed is the approved application for permit to rcdrill thc above referenced well. The permit to rcdrill does not exempt you from obtaining additional pcrmits required by laxv from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christcnson, P. E. Chairman BY ORDER OF THE COMMISSION dlf/Enclosures Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work: Drill [~ Redrill r~] I lb. Type of well. Exploratory [-'] Stratigraphic Test [~ Developr~e. nt. OiL[~] Re-entry D Deepen DI Service Development Gas [~ Single Zone r~ Mulliple Zone I I 2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 72.3 feet 3. Address 6. Properly Designation Prudhoe Bay Field P.O. Box 100360 Anchorage, AK 99510-0360 ADL 28326 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251) 2488' FNL, 4206' FEL, SEC. 32, T11 N, R15E, UM Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 4584' FSL, 1377' FWL, SEC. 32, T11 N, R15E, UM 05-01C #U-630610 At total depth 9. Approximate spud date Amount 242' FNL, 4098' FEL, Sec 32, T11 N, R15E, UM April 15, 1999 $200,000 12. Distance to nearest property line I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) feetI NO Close Approach feet 9799' MD / 8947' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 2O AAC 25.035 (e)(2)) Kickoff depth: 9110' MD Maximum hole angle 55° Maximum surface 2500 psig At total depth (TVD) 3400 psi~l @ 8800' 18. Casing program Settin~l Depth size Specifications Top Bottom Quant~ of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 2-3/4" 2-3/8" 4.6# L-80 FL4S 799' 9000' 8350' 9799' 8947' 5 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total Depth: measured 9675 feet Plugs (measured) PBTD tagged @ 9320' MD (9/08/1998) tree vertical 8954 feet Effective Depth: measured 9320 feet Junk (measured) tree vertical 8639 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 110' 20" 558 Sx P F 110' 110' Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710' Production 6812' 9-5/8" 2000 Sx Class G & 100 Sx PF II 6884' 6804' Liner 2610' 5-1/2" 171 Sx Class G 9315' 8634' Liner 679' 3-1/2" 67 Sx Class G 9675' 8965' Perforation depth: measured 9586' - 9600'; 9602' - 9650'; (perfs are covered by sand plug topped by cement plug) true vertical 8883' - 8885'; 8887' - 8931'. 0 JGiNAL. 20. Attachments Filing fee [~] Properly Plat r~ BoP Sketch ~] Diverler Sketch BI Drilling program r~ Drilling fluid progra.~ Time vs depth plot [~ Refraction analysis D Seabed report BI 20 AAC 25.050 requirements Fl 21. I hereby certify th~.~ foregoing is t~.Cct to the best of my knowledge Questions? Call Dan Kara @ 263-4837. Signed ~~/ Title: AAI Coil Tubing Drilling Supervisor Date ~,,~-'"' j~'~l'' ':''' Prepared by Paul Rauf 263-4990 Commission Use Onl} Permit~l~eL 50-~::~..~-~..O /~'~"'~:~3 I Approval¢~te . ISeecoverletter 2- ~ I APl number ~'--/~"' ¢¢ If°r°therrequirements Conditions of approval Samples required D Yes ~ No Mudlog required F~ Yes ]~ No Hydrogen sulfidemeasures D Yes J~ No Directional surveyrequired ~ Yes E] No Required working pressure for BOPE D2M; D 3M; D 5M; D 10M;D ~) 3500 psi for CTU Other: by order of ~__ /~,~ ,,,, Approved by ORIGINAL SIGNED BY commissioner the commission Date Robert N, Cl3nstenson Form 10-401 Rev. 12/1/85 · Submit in triplicate DS 5-01C CT Sidetrack and Completion Intended Procedure Objective: P&A well with 17 ppg cement. Mill window from mechanical whipstock. Directionally drill a horizontal well from the existing wellbore. Complete with 2-3/8" cemented liner. Perforate appropriate intervals. Intended Procedure: · P&A existing interval. Install mechanical whipstock at 9110'. Mill window from whipstock through both the 3-1/2" and 5-1/2" liners at 9110' md. Drill 10' of formation and perform leak-off test to 9.0 ppg, 0.5 ppg above the highest anticipated mud weight (8.5 ppg polymer mud). Crossing of faults are anticipated. If lost circulation is excessive and cannot be controlled with lost circulation material, plan on drilling ahead with water without returns. Directionally drill a conventional 2-3/4" (3" bi-center) well to access Zone 1 reserves. Planned TD is 9799' md. · Run 2-3/8" blank liner to TD, cement in place. · Perforate, place on production. Drilling fluids will be injected into disposal wells at Pad 3 or CC2A. ~ March 16, 1999 DS 5-01C Potential Drilling Hazards POST ON RIG No H2S production has been measured from this well. BHP: 3400 psi @ 8800' ss (7.4 ppg EMW), BHT 195 °F (estimated values based on offset wells). No over pressured zones are anticipated. Maximum anticipated WHP w/full column of gas: 2500 psi. High perm, gas saturated intervals are expected throughout the Sadlerochit. Crossing of faults are anticipated. Be prepared for lost circulation. If losses are excessive and cannot be controlled with lost circulation material, plan on drilling ahead with water without returns. March 16, 1999 DS C .... 01C PROPOSED CT SIDETr ..... CK 50' 4-1/2" HES HXO SVLN SSSV · 13-3/8" Shoe 2710' 9-5/8" x 4-1/2" Packer 6664' 4-1/2" Tubing BTM @ 6720' 9-5/8" Casing BTM @ 6884' Mechanical Whipstock Set @ -9110' 5-1/2" Shoe 9315' P&A'd 3-1/2" Liner up to 9125' with 15.8 ppg Cement Sand Mill Window in 3-1/2" x 5-1/2" Liner Lap @ 9110' 2-3/4" Open Hole 2-3/8" FL4S Liner- Cemented & Perforated 3-1/2" Shoe 9675' TD @ 9800' Created by planner Do~e plotted: 15-Mar-99 =let. Reference is §-0lA Version ~3 20DLS INC55. Coordinetes ere in feet. reference 5-01. True Vertical Depths ere reference rarefy table. --- Baker Hughes INT£0 --- ARCO Alaska, Inc, Slot · 5-01 Location · North Slope, Alaska Sfrucfure· D.S. 5 Field · Prudhoe Boy 8100 8200 85OO 8400 8500 8600 8700 8800 I 8900 v gO00 9100 9200 400 300 200 i i i i i i i i i i i i i i i i i i East (feet) -> 100 0 1 O0 200 300 400 500 - 2400 o T1 23OO 2200 z 2100 0 --i- 2000 19o0 1800 1700 ETie on - 26.1.5 Inc, 9050.00 Md, 8.396.45 Tvd, 1529.16 Vs nd of Build/Turn - 27.49 Inc, 9110.00 Md, 8450.00 Tvd, 155,3.47 Vs o Tvd, 1648.03 Vs T.D. & End of Build/Turn - 55.01 Inc, 9798.67 Md, 8875,00 Tvd, 2078,23 Vs i i i i i i i i i i i i i i i i i i i i i i i 1 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 Vertical Section (feet) -> Azimuth 340.00 with reference 0.00 N, 0.00 W from 5-01 ARCO Alaska, Inc. D.S. 5 5-01 Prudh0e Bay North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 5-01C Version #3 20 DLS Our ref : prop35 License : Date printed : 15-Mar-99 Date created : il-Mar-99 Last revised : 15-Mar-99 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 696997.000,5951440.940,999.00000,N Slot location is n70 15 52.977,w148 23 52.292 Slot Grid coordinates are N 5948981.100, E 698143.000 Slot local coordinates are 2489.13 S 1081.28 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. D.S. 5,5-01 Prudhoe Bay,North Slope, Alaska PROPOSAL LISTING Pa~e 1 Your ref : 5-01C Version #3 20 DLS Last revised : 15-Mar-99 Measured Inclin Azimuth True Vert R E C T A N G U L A R Dogleg Vert G R I D C O O R D.S Depth Degrees Degrees Depth C 0 0 R D I N A T E S De~/100ft Sect Eastin~ Northing 9050.00 26.15 8.32 8396.45 1739.98N 309.57E 9075.00 26.69 6.42 8418.84 1751.01N 311.00E 9100.00 27.26 4.60 8441.12 1762.30N 312.08E 9110.00 27.49 3.89 8450.00 1766.88N 312.42E 9125.00 30.16 1.02 8463.14 1774.10N 312.73E 9150.00 34.73 357.15 8484.24 1787.51N 312 9175.00 39.40 354.09 8504.18 1802.52N 311 9200.00 44.13 351.58 8522.82 1819.03N 309 9225.00 48.91 349.47 8540.02 1836.92N 306 9250.00 53.72 347.64 8555.64 1856.04N 302. 0.00 1529.16 698406.91 5950728.49 4.01 1539.04 698408.04 5950739.55 4.01 1549.28 698408.83 5950750.86 4.01 1553.47 698409.05 5950755.45 20.07 1560.15 698409.17 5950762.68 .48E 20.07 .31E 20.07 .22E 20.07 .22E 20.07 34E 20.07 1572.83 698408.57 5950776.07 1587.34 698407.01 5950791.05 1603.57 698404.48 5950807.50 1621.40 698401.02 5950825.30 1640.70 698396.64 5950844.31 9256.62 55.00 347.20 8559.50 1861.28N 301.17E 20.07 1646.03 698395.33 5950849.53 9275.00 54.88 346.22 8570.06 1875.93N 297.71E 4.42 1660.97 698391.49 5950864.07 9300.00 54.74 344.88 8584.47 1895.71N 292.61E 4.42 1681.31 698385.87 5950883.72 9325.00 54.61 343.53 8598.92 1915.34N 287.06E 4.42 1701.65 698379.81 5950903.19 9350.00 54.49 342.18 8613.42 1934.80N 281.05E 4.42 1721.99 698373.30 5950922.48 9375.00 54.39 340.83 8627.96 1954.08N 274.60E 4.42 1742.32 698366.35 5950941.59 9400.00 54.30 339.47 8642.54 1973.19N 267.71E 4.42 1762.63 698358.95 5950960.51 9425.00 54.23 338.11 8657.14 1992.11N 260.37E 4.42 1782.92 698351.12 5950979.23 9450.00 54.18 336.75 8671.76 2010.83N 252.58E 4.42 1803.18 698342.85 5950997.74 9475.00 54.14 335.39 8686.40 2029.36N 244.36E 4.42 1823.39 698334.15 5951016.04 9500.00 54.11 334.03 8701.05 2047.67N 235.71E 4.42 1843.56 698325.02 5951034.13 9525.00 54.10 332.66 8715.71 2065.77N 226.62E 4.42 1863.68 698315.46 5951051.98 9550.00 54.11 331.30 8730.36 2083.65N 217.11E 4,42 1883.73 698305.48 5951069.60 9575.00 54.13 329.93 8745.02 2101.30N 207.17E 4.42 1903.72 698295.09 5951086.98 9600.00 54.17 328.57 8759.66 2118.71N 196.81E 4.42 1923.63 '698284.28 5951104.12 9625.00 54.22 327.21 8774.28 2135,89N 186.03E 4.42 1943~45 698273.05 5951121.00 9650.00 54.29 325.85 8788.89 2152.81N 174.84E 4.42 1963.18 698261.42 5951137.63 9675.00 54.37 324.49 8803.47 2169.48N 163.24E 4.42 1982.81 698249.39 5951153.99 9700.00 54.47 323.14 8818.01 2185.89N 151.24E 4.42 2002.34 698236.96 5951170.08 9725.00 54.58 321.79 8832.52 2202.04N 138.83E 4.42 2021.75 698224.14 5951185.89 9750,00 54.71 320.44 8846.98 2217.91N 126.03E 4.42 2041.05 698210.93 5951201.42 9775.00 54.86 319.10 8861.40 2233.50N 112.84E 4.42 2060.21 698197.34 5951216.66 9798.67 55.01 317.83 8875.00 2248.00N 100.00E 4.42 2078.23 698184.12 5951230.82 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 5-01 and TVD from rotary table. Bottom hole distance is 2250.22 on azimuth 2.55 degrees from wellhead. Vertical section is from wellhead on azimuth 340.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. D.S. 5,5-01 Prudhoe Bay,North Slope, Alaska PROPOS~J~ LISTING Page 2 Your ref : 5-01C Version #3 20 DLS Last revised : 15-Mar-99 Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised Ti 698000.000,5951250.000,999.00 8875.00 2271.99N 83.57W il-Mar-99 C T Drilling Wellhead Detail Methanol Injection Otis 7" WLA Quick Connect - ~ CT Injector Head  ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure ~ I "-' 7" Riser I I I Annular BOP (Hydril),7-1/16" ID 5000 psi WP Alignment Guide Flange 7-1/16", 5M Ram Type Dual Gate BOPE Flanged Fire Resistant Kelly Hose to Dual HCR Choke Manifold Man Cutters or Combination Cutter/Blinds Slip/Pipe Rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Manual over Hydraulic Ram Type Dual Gate BOPE 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") ri 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 9-5/8" Annulus 13-3/8" Annulus PAUL RAUF 015412452359 1 0 5 ARCO ALASKA INC, P. O. BOX 100360 ATO - 1509 2-1/710 ANCHORAGE, AK 99510-0360 ~f~ate ~ to the 2 ?-,R 5 ,,~ NOT VALID FOR OVER $1000.00 0~05 ~ OFIR.~I' CHICAGO The First National Bank of Chicago Chicago, Illinois 60670 m:O ? ~,OOOO ~, tm-' 90 WELL PERMIT CHECKLIST FIELD & POOL 6 ~'"4::3/~",,,~ COMPANY ADMINISTRATION T ENGINEERING APPR DATE WELL NAME /~/ O~-0/~.. PROGRAM: exp~dev ?~, redrll ~ serv~ INIT CLASS GEOL AREA Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N ¥ N Cu wellbore seg ann. disposal para req ~ 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... GEOLOGY ANNULAR DISPOSAL APPR DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diver/er required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to '.~5'--O ~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. Permit can be issued w/o hydrogen sulfide measures ..... Y Data presented on potential overpressure zones ....... YY ~~,~"~ Seismic analysis of shallow gas zones ............. Seabed condition survey (if off-shore) ............. N Contact name/phone for weekly progress reports [exploratory only~ Y N 30. 31. 32. 33. 34. 35. With proper cementing records, this pla~/"' (A) will contain waste in a suitable,~,c'(giving zone; ....... Y N (B) will not contaminate freshw~at~r; or cause drilling waste... Y N to surface; (C) will not impair me~,l~nical integrity of t~used for disposal; Y N (D) will not dama, a, ge'producing for~ impair recovery from a Y N pool; and .~ (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N UNIT# //~'...(,--~3 ON/OFF SHORE GEOLq~GY:. ENGINEERING: UIC/_An_~_nu.,/~ COMMISSION: JDH ~ RNC"-- ~-' co ~ ~/(./~.~ Comments/Instructions: c:\msoffice\wordian\diana\checklist Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ape Subfiie 1 is type: LIS **** REEL HEADER MWD 99/ 9/20 BHI 01 LIS Customer Format Tape **** TAPE HEADER MWD 99/ 9/20 105263 01 1 3/4" NaviGamma - Gan~a Ray LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ _ Remark File Version 1.000 Extract File: Header.las -Version Inforraation VERS. 1.20: w~eP. NO: -Well Information Block CWLS log ~qOTT qe:~=~F -VERSION 1.20 One line per frame #MNEM.UNIT Data Tl~e Information STRT.F 9145.0000: _Starting Depth STOP.F 10130.0000: Ending Depth ~'~'~ ? 0.5000: Level e ...... ~ .... .... ~.~ NULL. -999.2500: ~sent COMP. COMPActlY: ARCO Alaska, inc. wu~.~. WELL: FLD . ~'zELD: Prudhoe Bay Unit LOC . LOCATION: 2488~ YNL ......... North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 1 3/4" NaviGamma - Gamma Ray REF . JOB REFERENCE: 105263 DATE. ~ .... 6 June 1999 AP1 . AP1 NUMBER: 500292013603 ~Parameter Information Block #MNEM. UNiT Value n .... -~ pe ~ .... PT, ~ ~,,-,~, ~ ~4~ T~4~ SECT. 32 : Section TO}~q.N lin · To'~ship ~EqG. !SE : Ran~ PDAT ..... . me~ : Permanent Datum EPD .F 72.3 : Elevation Of Perm. Datum LMF . KB : T.n.g ~ured From ~'u..~ 72.3 : Feet }~eove Perm. Datum DMF KB : ,~-~.~ Measured From EKE .F 72.3 : Elevation Of Kelly Bushing EDF .F N/A : Elevation Of Derrick Floor EGL .F N/A : Elevation Of Ground Level CA~E.~ 9156 · Casing Depth OSi . DiRECTiONAL : Other Services Line l ~Remarks 1) All depths are Measured Depths (MD) unless otherwise noted. 2) Ail depths are Bit Depths unless otherwise noted. 3) Ail Gamma Ray data (GRAX) presented is realtime data. 4) Well 05-01C was sidetracked @ 9156' MD (8416' SSTVD)~ from the original wellbore of Well 05-01. 94 1999 Alaska 0i! & Gas Con~. uomm~.s~on Aneomge (5) The gap in the log from 9750' MD (8698' $STVD) to 9778' MD (8709' SSTVD) is due to a depth adjustment applied after a tie in. (6) The section from 9778' MD (8709' SSTVD) to 9804' MD (8721' SSTVD) was relogged due to a malfuntion while restoring the data. (7) Well 05-01C was drilled to 10130' MD (8930' SSTVD) on Run 13. The TD was depth shifted to 10145' MD (8930' SSTVD) after a tie-in. (8) The interval from 10113' MD (8917' SSTVD) to 10130' MD (8930' SSTVD) was not logged due to sensor to bit depth. (9) The Gamma Ray log has been depth shifted to match the Schlumberger's MCNL Gamma Ray logged on 09 June 1999. (10) A Magnetic Declination correction of 27.86 degrees has been applied to the Directional Surveys. -Mnemonics GRAX ROPS TVD ~Sensor Offsets RUN GAMMA 5 16.84 ft. 6 16.84 ft. 7 16.84 ft. 8 16.50 ft. 9 16.61 ft. 12 16.58 ft. 13 16.58 ft. -> Gamma Ray MWD-API [MWDI (MWD-API units) -> Rate of Penetration, feet/hour -> True Vertical Depth, feet DIRECT I ONAL 21 83 ft 21 83 ft 21 83 ft 21 49 ft 21 60 ft 21 57 ft 21 57 ft Tape Subfile: ! Minimum record length: 14 bytes Maximum record length: 132 bytes [] Tape Subfile 2 is tpe: LIS FILE HEADER **** MWD .001 1024 INFORMATION TABLE: CONS MNEM VALU LCC 150 CN ARCO Alaska, Inc. ~ 05-01C FN Prudhoe Bay Unit COUN North Slope STAT Alaska LIS COMHENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ ! ! ! !!! !!!!! ! ! !!! !!! Remark File Version 1.000 1. The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC used is the Schlumberger's MCNL data, dated June 9, 1999. INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP __ i GR G PJ~i,~[ 0.0 2 ROP ROPS 0.0 * FORMAT RECORD (TYPE# 64) Entry Tpe 1) Size( 1) Repcode 66 Data record type is: 0 Entry Type 2) Size( 1) Repcode 66 Datum Specification Block Type is: 0 Entry Tpe 3) Size( 2) Repcode 79 Datum Frame Size is: 12 bytes Entry Type 4) Size( 1) Repcode 66 Logging direction is down (value= 255) Entry Tpe 5) Size( 1) Repcode 66 Optical Log Depth Scale Units: Feet Entry Type 8) Size( 4) Repcode 68 Frame spacing: 0.500000 Entry Type( 9) Size( 4) Repcode 65) Frame spacing units: iF ] fndun c [F ] 1.00000000 3 Entry Type( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type( 13) Size( 1) Repcode( 66) One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode( 66) Datum Specification Block Sub-tpe is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sum: 2 8 fndun a [F ] 1.00000000 [] FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size API AP1 AP1 API Log Crv Crv Length Typ Tp Cls Mod 1 GR MWD 2 ROP 68 1 API 4 -68 i 4 4 99 995 99 1 4 99 995 99 ! * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 24 Tape File Start Depth = 9145.000000 Tape File End Depth = 10135.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 66 1 datum Rep Code: 68 5947 datums Rep Code: 79 2 datums Minimum record length: 54 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER MWD .001 1024 INFORMATION TABLE: CONS MNEM VALU LCC 150 CN ARCO Alaska, Inc. ~ 05-01C FN Prudhoe Bay Unit COUN North Slope STAT Alaska LiS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ ! ! !! ! ! ! !! !!! !! !! !! ! Remark File Version 1.000 1. The data presented here is the unedited field raw data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ! G~Ai{ GP3Z{ 0.0 2 ROPS ROPS 0.0 FORMAT RECORD (TYPE# 64 Entry Tpe l) Size 1 Data record type is: Entry Tpe 2) Size 1 Datum Specification Block Entry Type 3) Size 2 Datum Frame Size is: Entry Type 4) Size 1 Logging direction is down Entry Type 5) Size 1 Repcode 66) 0 Repcode 66) Type is: 0 Repcode 79) 4o bytes Repcode 66) (value= 255) Repcode 66) Optical Log Depth Scale Units: Feet Entry Type 8) Size 4 Repcode 68) Frame spacing: 0.500000 Entry Tpe 9) Size 4 Repcode 65} Frame spacing units: [F ] fndun c IF ] 1.00000000 3 Entry Type( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type( 13) Size( 1) Repcode( 66) One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode( 66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry tpes encountered: 1 2 3 4 5 1 1 1 1 1 Rep Code Count 68 2 Sum: 2 fndun a [ F ] [] FRA~4E SPACE = ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: 7 8 9 10 11 12 13 14 15 16 0 1 1 0 1 0 1 0 0 1 Bytes 8 8 8 1.00000000 3 0. 500 * F Name Tool Code Samples Units Size i G~ ~,iD 68 i 4 2 ROPS ~D 68 i 4 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 24 AP1 API AP1 AP1 Log Crv Crv Length Tp Tp Cls Mod 4 99 995 99 ! Tape File Start Depth = 9145.000000 Tape File End Depth = 10135.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 66 1 datum Rep Code: 68 5947 datums Rep Code: 79 2 datums Tape Subfile: 3 31 ..... d .... Minimum record length: 54 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS **** TAPE TRAILER **** MWD 99/ 9/20 105263 01 **** REEL TRAILER **** MWD 99/ 9/20 BHI 01 T~p: c:,~i~: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Hon 20 SEP 99 11:44a Elapsed executien time = 1.32 seconds. SYSTEM RETURN CODE = 0 Tape Subfile i is ~_.~e: LiS Tape Subfile 2 is Uype: LiS 9145.0000 -999.2500 -999.2500 9145.5000 -999.2500 -999.2500 9200.0000 42.3400 83.7000 9300.0000 23.3600 11.9500 9400.0000 30.6170 98.4850 9500.0000 25.5220 64.2000 9600.0000 23.3600 72.0780 9700.0000 115.3400 82.0860 9800.0000 25.0800 -999.2500 9900.0000 24.6820 34.8090 10000.0000 62.3200 76.7770 10100.0000 143.6400 33.7230 10135.0000 -999.2500 17.3000 Tape File Start Depth = 9145.000000 Tape File End Depth = 10135.000000 Tape Pile Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9145.0000 -999.2500 -999.2500 9145.5000 -999.2500 -999.~500 9200.0000 46.7200 83.7000 9300.0000 26.7670 11.3000 9400.0000 30.6600 99.1990 9500.0000 30.6600 65.4000 9600.0000 23.9800 65.5030 9700.0000 96.3600 138.4000 9800.0000 95.7600 -999.2500 9900.0000 45.6000 78.2000 10000.0000 50.1600 48.0960 1010,0.0000 152.0000 12.0000 10135.0000 -999.2500 -999.2500 Tape File Start Depth = 9145.000000 Tape File End Depth = 10135.000000 /ape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subfile 4 is type: LIS !999 Oil & Gas -Cons. Commission