Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout199-028Samuel Gebert Hilcorp Alaska, LLC
GeoTech Assistant 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
Fax: 907 777-8510
E-mail: sam.gebert@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: Date:
DATE: 10/29/2020
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
GPB 05-01C (PTD 199-028)
PNC3D 09/14/2020
Please include current contact information if different from above.
PTD: 1990280
E-Set: 34140
Received by the AOGCC 10/29/2020
Abby Bell 10/30/2020
ovzaito
Schl~6er~r
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503da3a
ATiN: Beth
Well Job #
N0.5478
Company: State of Alaska
Alaska Oil b Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Log Description Date BL Color CD
.i •~.
OS-01C AYKP-00062 RST 01/17/10 1 1
05-38 AVKP-00083 RST 01/22/10 1 ~ 1
12-05A
05-288 11963097
BBSK-00002 MCNL
RST 06/02/08
01/20/10 1
1 1
1
nGVG~r~ ~~ JRl11Y~lY~i N~YU l~CI Vr~r'Ir1Y~i VIYC I~Vrr CX\rrl IV:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-t
900 E. Benson Blvd.
Alaska Data & Consulting Services
_. ,_ w
__
~1Flii;> , ~~i:;~~~;
lE,i;
b
199-028-0 PRUDHOE BAY UNIT
Roll #1: Start: Stop Roll #2:
MD 10145 TVD 09015 Completion Date:
05-01C 50- 029-20136-03
Start Stop
6/12/99 Completed Status: 1-OIL
BP EXPLORATION
(ALASKA) INC
Current:
T Name Interval
c 9245 ~ 1 SCHLUM MCNL
D 9299 ~ PDS GR/CCL
D 9330J FINAL BH GR
L GR-MD j FINAL 9150-10145
L GR-TVD '~'~'~ FINAL 8416-8930
L MCNLt~''''~ FINAL 6483-10092 6/9/99
R SRVY LSTNG~/ BHI 9100-10145
Sent Received
CH 7/23/99 7/26/99
CH 9/14/99 9/14/99
OH 9/20/99 9/24/99
OH 9/20/99 9/24/99
OH 9/20/99 9/24/99
CH 2 7/23/99 7/26/99
OH 6/25/99 6/25/99
T/C/D
D
C
Wednesday, May 02, 2001 Page 1 of 1
ua/zz/ZUOl lO:3§ FAX 907 fi§4 4264 BP EXPLORATION
bp
March 21' 2001
~ 001
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
'(907) 561-5111
Julie Heusser, Dan Seamount, & Cammy Oechsli Taylor
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Fax 276-7542
Dear Commissioners:
RECEIVED
HAR 2 J 200
Alaslm Oil & Gas Cons. CommOn, on
Re: Prudhoe-EOA, Pt. Mac, & Lisbume Well Work
This listing is provided as req~uired under the terms of Conservation Order No. 341C (Rule 14) &
Order No. 342. This is a list df well work tentativel~ scheduled for March 19 - 26, 2001:
Well
05-18A
Work Planned
CTE PERFORATION
CTE ADD PERFORATION
06-24A
CT ACID STIMULATION WI DIVERTER
12-15
SAG HYDRAULIC FRACTURE TREATMENT
13-27A
16-23Ai
NK-65i
CT ADD PERFORATION W/WORK PLATFORM
CHE~C~ CUT TUBING (PRE RIG ST)
CTE ADD PERFORATION
S-101
S-103
ADD PERFORATION
INITIAL PERFORATION
If additional data or scheduling information is needed, please call me at 564-5799 or E-mail me
at raufpc @bp.com.
Sincerely, ~ ~' _
Paul C. Rauf
Technical Assistant, BPXA
Alaska Drilling & Wells
', J' STATE OF ALASKA ' ::'~
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__X RKB 72 feet
3. Address Explorato~ 7. Unit or Property name
P. O. Box 196612 Stratigraphic__
Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
2488' FNL, 4206' FEL, Sec. 32, T11 N, R15E, UM (asp's 698143, 5948981) 05-01C
At top of productive interval 9. Permit number / approval number
236' FNL, 4200' FEL, Sec. 32, T11 N, R1 SE, UM (asp's 698083, 5951234) 199-028
At effective depth 10. APl number
50-029-20136-03
At total depth 11. Field / Pool
171' FNL, 4328' FEL, Sec. 32, T1 1 N, R15E, UM (asp'$ 697952, 5951294) Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 10145 feet Plugs (measured) Tagged PBTD @ 101 12' MD on 9/8/1999.
true vertical 9015 feet
Effective depth: measured 10112 feet Junk (measured)
true vertical 8989 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 110' 20" 558 Sx PF 110' 110'
Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710'
Production 6812' 9-5/8" 2000 Sx Class G & 100 Sx PF II 6884' 6804'
Liner 2445' 5-1/2" 171 sx C~ass G 9150' 8485'
Liner 154' 3-1/2" 67 sx Class G 9150' 8485'
Liner 3447' 3-1/2"/2-3/8" 72 bbls 17 ppg LARC 10142' 9012'
Perforation depth: measured 10004'- 10012'; 10027'- 10042'; 10050'- 10082'.
true vertical 8909' - 8915'; 8925' - 8936'; 8942' - 8966'.
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 6720' MD. RECEIVED
Packers & SSSV (type & measured depth) 9-518" X 4-1/2" TIW HBBP-T PACKER @ 6664' MD.
4-112"HESHXOSVLNSSSV @ 510'MD. /~AR ~ 7 /O00!
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached) ~aS~(a Oil &~ ~ _Gas Cons.- ,JC°rnm~ss'0~
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 430 10088 0 - 585
Subsequent to operation 1149 10146 0 - 643
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations __X Oil __X Gas __ Suspended __ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed '~7./¢~_~ ~~~~,~~ Title: DS 5 Surveillance Engineer Date March 20, 2001
Brian Carlson Prepared by Paul Rauf 564-5799
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
05-01C '-
DESCRIPTION OF WORK COMPLETED
PERFORATING OPERATIONS
Date
Event Summary
12/17/2000:
3/17/2001 -
3/18/2001:
RIH & drifted to 9360' SLM (HAW).
MIRU CTE. PT'd BOPE. RIH w/CTE conveyed perforating guns & did Icg tie in f/10075' -
9775'. Shot 23' of perfs as follows:
Add Perforated
10004'- 10012' MD (Zone lB) Reference Log: MCNL 6/09/1999.
Reperforated
10027'- 10042' MD (Zone 1 B)
Used 1-11/16" carriers & all shots @ 6 SPF, random orientation, 60° phasing, &
overbalanced press. POOH w/guns. ASF. RD CTE. Placed well BOL.
Obtained a valid well test.
Page 1
RECEIVED
MAR 200!
A/asEa 0ii & Gas Cons. Commission
Anchorage
AOGCC
Lori Taylor
3010 Porcupine Drive
Anchorage, AK 99510
Well Reference Data:
Well No: 05-01C
Field: Prudhoe Bay Unit
County: North Slope
State' Alaska
Date- 09/20/99
API No: 500292013603
BHI Job#: i05263
Enclosed is the following data as listed below:
Log Type Bluelines
Navigamma
USMPR
~DL/MNP
DPR/~DL/~DP
TOTALS:
Log T~pe
Navigamma
USMPR
~DL/MNP
DPR/MDL/MDP
Bluelines
2" + 5" Measured Depth Logs
Folded Sepias Rolled Sepias
1
2" + 5" True Vertical Depth Logs
Folded Sepias Rolled Sepias
1
Mylar Film
Mylar Film
LAS Disks :
Survey Listing ASCII Disks :
LIS Tape Image File Disks :1
LIS Verification Report & Listings :1
Depth Shift Monitor Plot :
Upon Receipt, Please sign and fax to: Baker Hughes INTEQ
At~~~~
,-,~:~ o 4 t999
Date:
Alas.ka Oit & Gas Cons. Commi~ion
~omge
I ELL L:OG
.... TRiI MITTIIL.
,Active Diagnostic Services, Inc.
To~
ARCO Alaska, Inc.
AOGCC
Lori Taylor
RE' Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Robert Richey
POS, Inc.
Mail Pouch 340112
Prudhoe Bay, AK 99734
' ' LoG DIGITAL ' MYLAR / BLUE LINE DIGITAL
WELL DATE TYPE DATA SEPIA PRINT(S) REPORT
FILM
Open Hole I I I 1
i
! Res. Eval. CH I I 1
5-01C 9-8-99 I Mech. CH 1
Caliper Survey I
Signed '
Print Name:
ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734
Phone:(907)659-2307 Fax:(907)659-2314 E-mail: pdsprudhoe~NA800.net Website: wwwv.memorylog.com
C :Wly Documents~Excel_Word_Documents\Distribution_FormsXArco_pb_form.doc
Schlumberger
NO. 12703
7/23/99
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A'I-rN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
(Cased Hole)
Well Job # Log Description Date BL Sepia CD
D.S. 3-31 99283 RST-SIGMA ~ ~ ~.H ~-~ 990704 I I 1
D.S. 4-23A 99280 CNTG ~ ~q...~c~ 990629 I I 1
D.S. 5-01C 99266 MCNL ~ ~ ~-[~" 990609 I I 1
D.S. 6-08A 99281 CNTG ~. ~ ~{~ 990628 I I 1
D.S. 12-27A 99265 MCNL ~. ~~ 990602 I I I
,,,
,,,
SIGNE DATE:
~fla~ka Oil & Gas Co~ls.
Plea~ ~ign and r~tum one ~opy of thi~ transmittal to Sherrie at the above addre~ or fa~ to (907) 561-8317. ~nan~ you.
STATE OF ALASKA
ALAS'~' OIL AND GAS CONSERVATION COMIV,~ION ~,~,j~_ "~' ~ ~
WELL COMPLETION OR RECOMPLETION REPORT AN
1. Status of well Classification of Service~W,~, I "
Oil ~ Gas ~ Suspended ~ ~andon~ ~ Semico ~ 4Ia~
2. Name of Operator 7. Permit Number '" '~ ~e ¢~.._
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510-0360 50-029-20136-03
4. Location of well at suda~ 9. Unit or Lease Name
~ ................. ~ ] ~'~. Prudhoe Bay Unit
2488' FNL, 4206' FEL, SEC. 32, T11N, R15E, UM ~ CE:~,~PL~T~0~
At Top Producing lnte~al ~~]~ ~~~ ' lO. Woll.umbo,
236' FNL, 4200' FEL, SEC 32, TllN, R15E, UM 05-01C
AtTotal Depth ~ ~~~ 11. Fieldand Pool
173' FNL, 4327' FEL, SEC 32, T11 N, R15E, UM ~. Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and ~e~ai~-
RKB 72.3 feet~ ADL28326 Prudhoe Bay Oil Pool
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Su~. Or ~d. J15. Water Depth, if offshore 16. No. of Completions
May31, 1999 June7, 1999 June 12, 1999 ~ N/A feetMSL 1
17. Tot~ Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Suwey ~20. Depth where SSSV set 21. Thic~e~ of Permafrost
10145' MD/9015' ~D 10106' MD /8984' ~D YES ~ No ~J 0510'
feet MD
1900'
(approx)
22. T~e Electdc or Other Logs Run
23. CASING, LINER AND CEMENTING RECORD
SE~ING DEPTH MD
CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEME~ING RECORD~ AMOUNT PULLED
20" 94¢ H-40 Surfa~ 110' 36" 558 Sx PF
13-3/8" 72¢ MN-80 Surfa~ 2710' 17-1/2" 5o74 Sx PF II
9-5/8" 40¢ / 47¢ N-80/S-95 Surfa~ 6884' 12-1/4" 2000 Sx Cla~ G & 100 Sx PF II
5-1/2" 17¢ L-80 6705' 9150' 6-3/4" 171 Sx Cla~ G
3-1/2" 9.2¢ L-80 8996' 9150' 4-3/4" 67 Sx Class G
3-1/2"/2-3/8" 9.3¢/4.6~ L-80 6695' 10142' 3" 72 bbls of 17 ppg ~RC
24. Pedorations open to Production (MD + TVD of Top and BoSom and 25. ~BING RECORD
intewal, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 6720' 6664'
10050' - 10082' MD; 8942' - 8966' ~D; ~4 SPF
26. ACID, F~CTURE, CEMENT SQUEEZE, ~C.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
(See Sidetrack Summaw for details)
27. PROD~TION TEST
Date Fimt Production Method of Operation (Flowing, gas li~, etc.)
June 18, 1999 Gas lift
Date of Test Hours Tested Production for OIL-BBL ~S-MCF IWATER-BBL CHOKE SIZE I~S-OIL ~TIO
I
Test Pedod >
Row Tubing Casing Pressure C~culated OIL-BBL ~S-MCF WATER-BBL OIL G~VI~ - APl (co~)
24-Hour Rate >
28. CORE DATA
Brief description of litholo~, pomsi~, fractures, ~pamnt dips ~d pms~n~ of oil, gas or water. Submit ~m chips.
* This 10-407 is submitted as directed per the 10-401 form approved April 14, 1999 (Permit ~9-28)
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate
29. 30.
NAME
Top of Sag River Sand
Shublik
Top of Sadlerochit
Top of Zone 1
Base of Sadlerochit
GEOLOGIC MARKERS
MEAS. DEPTH
8988'
9034'
9103'
9938'
10082'
TRUE VERT. DEPTH
8344'
8382'
8444'
8865'
8966'
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity.
GOR, and time of each phase.
31. LIST OF ATTACHMENTS
Summary of 05-01C CT Sidetrack Drilling Operations + Survey.
32. I hereby certify that the following is true and correct to the best of my knowledge.
Signed .~~ ¢ '_~/~v~
~ Bruce E. Smith, P.E. ~c~F~ "~"~4/ql~ Tille AAI Coil Tubinq Drilling Supervisor
Date
INSTRUCTIONS
Prepared by Paul Rauf 263-4990.
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21-' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
05-01C
DESCRIPTION OF WORK COMPLETED
COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY
Date Event Summary
5/28/1999: MIRU CTU.
5/29/1999:
5/30/1999:
5/31/1999:
6/01/1999:
6/02/1999:
6/03/1999:
6/04/1999:
6/05/1999:
6/06/1999:
RU CTU. PT'd BOPE. RIH & killed well. Tagged up on 3-1/2" liner top tie back sleeve.
Sheared off TIW Whipstock tray & left same @ top of 3-1/2" liner as fish. POOH.
RU Slickline Unit. RIH w/3.65" LIB & tagged 8991' MD. POOH. Impression indicated
Whipstock fell downhole. RIH w/2-1/2" LIB & tagged top of the Whipstock tray @ 9157'.
POOH. RD Slickline Unit. A CTU Cement Plug was pumped to Plug & Abandon the lower
wellbore prior to ST operations as follows: RIH w/CT & pumped KCL Water. Pumped 10
bbls of 17 ppg Neat Class G Cement, followed by 25 bbls of 17 ppg Class G Cement w/20
ppb aggregate, followed by 6 bbls of 17 ppg Neat Class G Cement to abandon the perfs
located @:
9138'-9158' MD Reference Log: BHCS 8/29/1974.
9586'-9600' MD
9602'-9650' MD
Placed 20 bbls of Cement behind pipe & attained a max sqz press of 1750 psi. Contaminated
cement w/Biozan & jetted contaminated Cement f/the wellbore to 9120' MD. POOH w/CT.
Left 500 psi on wellhead. WOC.
WOC. RIH & tagged Top of Whipstock Tray @ 9151' MD. PT'd squeezed well to 1050 psi -
lost 0 psi in 30 min. POOH. RIH w/BHA to BTM & commenced window milling procedure
through the 3-1/2" & 5-1/2" liners.
Milled window f/9151 to 9157' MD. Drilled ahead into FM to 9167' & POOH. RIH w/Crayola
mill. Unable to enter window so POOH. RIH w/cut rite Crayola mill.
Again unable to penetrate window w/mill so POOH. RIH w/parabolic diamond mill & tagged
9149.6'. Time drilled to 9155.6' (drilling break) & onto 9165'. Reamed/backreamed window
interval. POOH w/BHA. RIH & drilled to 9189'. Swapped hole to FIo Pro. Performed LOT to
EMW of 9.2 ppg.
Drilled to 9305' & POOH. Drilled to 9338' & POOH. RIH & drilled to 9408' w/lost returns.
Pumped 1% KCL Water.
POOH w/BHA. RIH & drilled to 9558'. POOH. RIH & drilled to 9768'. Took gas influx &
bullheaded to kill well. POOH w/BHA. RIH w/CT.
Squeezed gunk pill. POOH w/CT. PT'd BOPE. RIH & cleaned out gunk f/7946' to 9360'.
Lost all returns @ 9360'. Tagged BTM @ corrected 9790'. POOH.
Performed CTU maintenance. RIH w/bi-centered bit & drilled to 9820'. POOH. RIH w/BHA.
6/07/1999:
Drilled to TD @ 10145' MD & POOH. RIH & conditioned hole. Spotted LCM pill. PUH while
laying in High Vis FIo Pro.
Sidetrack Summary Page I
05-01 C
DESCRIPTION OF WORK COMPLETED
COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY
Date
Event Summary
6/08/1999:
6/09/1999:
6/11/1999:
6/12/1999:
Spotted 2nd LCM pill. Still encountering lost returns. POOH. Performed CTU maintenance.
MU 3-1/2" x 2-3/8" liner.
RIH w/liner & landed it @ 10142' MD. TOL = 6685'. Unstung & displaced liner to 2% KCL
Water. POOH. Top of Liner @ 13120' MD. Unstung f/liner & reattached. Pumped 48 bbls
of 17 ppg Latex Acid Resistive Cement to cement the liner in place. No returns.
Contaminated Cement w/Biozan & jetted contaminated Cement f/wellbore to 10111' MD.
POOH w/CT. RIH w/1-11/16" CNL./GR Memory tool & tagged Backdoor Flapper Valve @
10106' MD. Logged well & POOH w/logging tools. RIH w/nozzle & tagged BTM. Displaced
liner f/TD to liner top w/17 ppg mud. Bullheaded Crude down backside. Pumped 2 bbls
Neat LARC, followed by 22 bbls of LARC w/20 ppb Aggregate for a liner lap squeeze. No
squeeze pressure attained. PUH to 6500' MD.
WOC. PT'd liner lap to 1500 psi - passed. Cleaned out liner & laid in new FIo Pro. POOH.
RIH w/Perf guns & tagged BTM. Positioned guns @:
10050' - 10082' MD (Zone 1)
Shot 32' of Initial Perforations in the 2-3/8" liner. Used 1-11/16" carriers & shot all Perfs @ 4
SPF, random orientation, & 0° phasing. POOH w/guns. ASF. FP'd well. RDMOL.
Placed well on initial production & obtained a valid well test.
Sidetrack Summary Page 2
8300-
8400
8500
8600
~ ~ 8700
> 8800
I--- 8900
I
9000
ARCO Alaska, Inc.
Structure : D.S. 5
Field : Prudhoe Bay
Well : 5-01C, 50-029-20156-05
Location : Nodh Slope, Alaska
<- West (feet)' East (f.et) ->
700 600 500 400 300 200 100 0 100 200 300 400 500 600 700
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ! _
ORIGINAL
Tie on
L RECEIVED
[ ~~ A~aska Oil & Gas Cons. Commission
ted orage
9100 i I I I I I I I I I ' I I I I I I I ' I I I I I I I I I I I I I I I ' I
500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100
VerticalSeCtion (feet)->
Tie on
Azimuth 505.00 with reference 0.00 S, 0.00 E from 5-01
-2600
2500
2400,,.
23O0
22oo A
I
2100
2000
1900
1800
1600
1500
ARCO Alaska, Inc.
D.S. 5
5-01C
5-01
Prudhoe Bay
North Slope, Alaska
SURVEY LISTING
by
Baker ~{ughes INTEQ
Your ref : 5-01C
Our ref : svy173
License : 50-029-20136-03
Date printed : 23-Jun-1999
Date created : 23-Jun-1999
Last revised : 23-Jun-1999
Field is centred on 708179.340,5930615.440,999.00000,N
Structure is centred on 696997.000,5951440.940,999.00000,N
Slot location is n70 15 52.977,w148 23 52.292
Slot Grid coordinates are N 5948981.100, E 698143.000
Slot local coordinates are 2489.13 S 1081.28 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ARCO Alaska, Inc.
D.S. 5,5-01C
Prudhoe Bay,North Slope, Alaska
SURVEY LISTING Page 1
Your ref : 5-01C
Last revised : 23-Jun-1999
Measured Inclin Azimuth Subsea
Depth Degrees Degrees Depth
R E C T A N G U L A R Dogleg Vert G R I D C O O R D S
C O O R D I N A T E S Deg/100ft Sect Easting Northing.
9100.00 27.49 3.89 8368.76 1762.40N 311.95E 4.81 698.25 698408.69 5950750.96
9166.00 31.60 7.00 8426.17 1794.77N 315.09E 6.64 713.25 698410.99 5950783.41
9210.00 40.10 16.50 8461.83 1819.87N 320.53E 23.04 722.35 698415.77 5950808.63
9232.00 44.80 22.70 8478.06 · 1.833.83N 325.54E 28.58 725.75 698420.41 5950822.72
9256.00 47.60 25.00 8494.67 1849.66N 332.55E 13.56 728.50 698427.01 5950838.73
9286.00 52.20 18.50 8514.00 1870.97N 341.01E 22.57 733.01 698434.90 5950860.25
9316.00 60.00 16.30 8530.72 1894.71N 348.42E 26.70 739.72 698441.69 5950884.18
9348.00 69.50 5.80 8544.39 1923.05N 353.85E 41.93 750.60 698446.38 5950912.65
9388.00 77.30 0.80 8555.82 1961.28N 356.02E 22.88 769.60 698447.55 5950950.92
9443.00 68.50 353.20 8571.99 2013,68N 353.36E 20.74 800.38 698443.51 5951003.23
9478.00 68.00 331.30 8585.10 2044.41N 343.54E 58.09 825.35 698432.89 5951033.68
9518.00 62.80 312.40 8601.87 2072.90N 321.31E 44.83 859.51 698409.93 5951061'58
9549.00 68.60 310.10 8614.63 2091.51N 300.07E 19.89 887.46 698388.21 5951079.63
9585.00 64.90 308.10 8628.83 2112.37N 274.42E 11.47 920.34 698362.02 5951099.81
9615.00 62.30 303.10 8642,18 2128.02N 252.59E 17.26 947.16 698339.79 5951114.88
9648.00 63.70 301.20 8657.16 2143.66N 227.69E 6.66 976.56 698314.49 5951129.86
9696.00 68.50 299.90 8676.60 2165.95N 189.91E 10.30 1020.39 698276.14 5951151.16
9742.00 65.00 296.30 8694.76 2185.86N 152.65E 10.47 1062.49 698238.37 5951170.09
9773.00 66.00 294.40 8707.62 2197.94N 127.15E 6.44 1090.44 698212.57 5951181.49
9798.00 64.30 295.50 8718.13 2207.51N 106.59E 7.89 1112.90 698191.77 5951190.52
9831.00 60.60 294.06 8733.39 2219.77N 80.03E 11.86 1141.86 698164.90 5951202.08
9849.00 59.10 291.10 8742.43 2225.75N 65.66E 16.48 1157.16 698150.38 5951207.68
9878.00 56.80 292.60 8757.82 2234.89N 42.85E 9.06 1181.27 698127.34 5951216.23
9914.00 53.60 292.70 8778.36 2246.28N 15.57E 8.89 1210.35 698099,77 5951226.89
9951.00 50.30 292.80 8801.16 2257.54N 11.29W 8.92 1239.02 698072.62 5951237.45
9986.00 47.50 295.40 8824.17 2268.30N 35.37W 9.76 1265.07 698048.27 5951247.57
10017.00 44.20 295.30 8845.76 2277.82N 55.47W 10.65 1287.11 698027.94 5951256.56
10045.00 43.00 296.50 8866.04 2286.25N 72.84W 5.21 1306.27 698010.35 5951264.53
10083.00 41.00 298.70 8894.28 2298.02N 95.37W 6.53 1331.58 697987.52 5951275.71
10100.00 39.00 298.30 8907.30 2303.23N 104.97W 11.86 1342.47 697977.78 5951280.67
10145.00 39.00 298.30 8942.27 2316.66N 129.91W 0.00 1370.69 697952.51 5951293.44
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from 5-01 and SSTVD from RKB - MSL = 72.32ft.
Bottom hole distance is 2320.30 on azimuth 356.79 degrees from wellhead.
Vertical section is from wellhead on azimuth 303.00 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
D.S. 5,5-01C
Prudhoe Bay,North Slope, Alaska
SURVEY LISTING Page 2
Your ref : 5-01C
Last revised : 23-Jun-1999
Comments in wellpath
MD SSTVD Rectangular Coords. Comment
9100.00 8368.76 1762.40N 311.95E Tie on
10145.00 8942.27 2316.66N . 129.91W Projected to TD
Targets associated with this wellpath
Target name Geographic Location SSTVD Rectangular Coordinates Revised
5-01 ehs 697970.000,5951095.000,999.00 8855.00 2117.82N 117.61W Il-Mar-1999
- _ .... STATE OF ALASKA ~---' -
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
ARCO Alaska, Inc. Development~X RKB 72 feet
3. Address Explorato~__ 7. Unit or Property name
P. O. Box 100360 Stratigraphic__
Anchorage, AK 99510-0360 Servia__ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
2488' FNL, 4206' FEL, Sec. 32, T11N, R15E, UM 05-01C
At top of productive interval 9. Permit number / approval number
236' FNL, 4200' FEL, Sec. 32, T11 N, R15E, UM 99-28
At effective depth 10. APl number
50-029-20136-03
At total depth 11. Field / Pool
171' FNL, 4327' FEL, Sec. 32, T11 N, R15E, UM Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 10145 feet Plugs (measured) Tagged PBTD @ 10106' MD (6/10/1999)
true vertical 9015 feet
Effective depth: measured 10106 feet Junk(measured)OF ISINA
true vertical 8984 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 110' 20" 558 Sx PF 110' 110'
Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710'
Production 6812' 9-5/8" 2000 sx Class G & 100 Sx PF II 6884' 6804'
Liner 2445' 5-1/2" 171 Sx C~ass G 9150' 8485'
Liner 154' 3-1/2" 67 Sx C~ass G 9150' 8485'
Liner 3447' 3-1/2"/2-3/8" 72 bbls 17 ppg I_ARC 10142' 9012'
Perforationdepth: measured 10027'-10042';10050'- 10082'.
true vertical 8925' - 8936'; 8942' - 8966'.
Tubing (size, grade, and measured depth) 4-1/2"12.6¢, Los0 Tbg @ 6720' MD.
Packers & SSSV (type & measured depth) 9-5/8" X 4-1/2" TIW HBBP-T PACKER @ 6665' MD.
4-1/2" HES HXO SVLN SSSV @ 511' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation (shut in)
Subsequent to operation 815 -1500 17 - 504
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run ~
Daily Report of Well Operations .__X Oil __X Gas ~ Suspended __ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~¢~ ~'~,.~_~,,~_.,,._~¢'~ ~" ('")'/~" Title ARCO Engineering S ape rvisor D ate ~///~/-//~,,,~
Erin Oba Prepped by Paul Rauf 263-4990
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
.... 05-01 C
DESCRIPTION OF WORK COMPLETED
PERFORATING OPERATIONS
Date
Event Summary
9/08/1999:
MIRU CTU & PT'd equip to 3500 psi. RIH w/pen' guns &shot 15' of Add Pen'orations @:
10027'- 10042' MD (Zone lB) Reference Log: MCNL 6/09/1999.
Used 1-11/16" carriers & all shots @ 4 SPF, random orientation, 180° phasing, &
overbalanced press. Did not tag BTM. POOH w/guns. ASF. RD.
Returned well to production & obtained a valid welltest.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Robert Christenson,~ DATE: May 28, 1999
Chairman
THRU: Blair Wondzell, ~1~~ FILE NO: aeple2gf.doc
P. I. Supervisor 6[~67
FROM: John H Spaulding, (~), _~'~ SUBJECT:
Petroleum Inspectc
CTD
BOPE Test
Nabors 3S / Dowell
ARCO DS-5-01 c
PTD' 99-28
May 28, 1999: I traveled to ARCO's DS 5-01c to witness the BOPE Test on
Nabors 3S / Doweil coiled tubing drilling rig. The AOGCC BOPE Test report is
attached for reference.
As noted on the test report the blind rams failed, these were rebuilt and
retested after I left location.
SUMMARY: I witnessed the BOPE Test on;
Nabors 3S / Dowell, 1 failure, 6 hour test time.
Attachment' aeple2gf.xls
Not confidential
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
Coil Tubing Unit BOPE Test Report
OPERATION: Drlg: X Workover:
Drlg Contractor: Nabors / Dowefl
Operator: ARCO
Well Name: 5-01C
Casing Size: Set @
Test: Initial X Weekly
Rig No. 3S PTD #
Rep.:
Rig Rep.:
Location: Sec.
Other
;: .,~:': :TEST DATA
DATE: 5/28/99
99-28 Rig Ph.# 659-5515
Steve Bradley
Dave Duerr
32 T. 11N R. 15E Meridian Umiat
BOP STACK:
Coil Tubing Unit:
Pipe/Slip Rams
Pipe/Slip Rams
Blind Rams
Reel Isolation Valve
Deployment:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Quan.
Test
Pressure P/F
250/3500 P
1 250/3500 P
1 250/3500 P
1 250/3500 P
1 250/3500 P
1 250/3500 P
1 250/3500 P
1 250/3500 F
2 250/3500 P
1 25O/35OO P
1 250/3500 P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
Test
Quan. Pressure P/F
12 250/3500 P
32 250/3500 P
I P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's: 4 @ 2200 avg.
Functioned
Functioned
MUD SYSTEM: Visual Alarm MISC. INSPECTIONS:
Trip Tank ok ok Location Gen.: ok
Pit Level Indicators ok ok Housekeeping: ok
Meth Gas Detector ok ok , Permit to drill: yes
H2S Gas Detector ok ok " Standing Order Posted
2,900 P
2,000 P
X
minutes 17 sec.
minutes 49 sec.
Remote: X'
Psig.
y~s
Well Sign ok
Drl. Rig ok
Hazard Sec. yes
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested '/9 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the
AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: Blind rams failed, will be rebuilt and tested after the test.
Distribution:
orig-Well File
c- Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
John H. Spauiding
Form Revised 2/20/97 L.G. aeple2gf, xls 612J99
ALASKA OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
April 7, 1999
Bruce E. Smith, P.E.
AAI Coil Tubing Drilling Supervisor
ARCO Alaska, Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re:
Prudhoe Bav Unit 05-0 lC
ARCO Alaska, Inc.
Permit No: 99-028
Sur Loc: 2488'FNL, 4206'FEL, Sec. 32, T1 IN. R15E, UM
Btmhole Loc. 242'FNL, 4098'FEL, Sec. 32, TI 1N, R15E, UM
Dear Mr. Smith:
Enclosed is the approved application for permit to rcdrill thc above referenced well.
The permit to rcdrill does not exempt you from obtaining additional pcrmits required by laxv from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Robert N. Christcnson, P. E.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work: Drill [~ Redrill r~] I lb. Type of well. Exploratory [-'] Stratigraphic Test [~ Developr~e. nt. OiL[~]
Re-entry D Deepen DI Service Development Gas [~ Single Zone r~ Mulliple Zone I I
2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. RKB 72.3 feet
3. Address 6. Properly Designation Prudhoe Bay Field
P.O. Box 100360 Anchorage, AK 99510-0360 ADL 28326 Prudhoe Bay Oil Pool
4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251)
2488' FNL, 4206' FEL, SEC. 32, T11 N, R15E, UM Prudhoe Bay Unit Statewide
At top of productive interval 8. Well number Number
4584' FSL, 1377' FWL, SEC. 32, T11 N, R15E, UM 05-01C #U-630610
At total depth 9. Approximate spud date Amount
242' FNL, 4098' FEL, Sec 32, T11 N, R15E, UM April 15, 1999 $200,000
12. Distance to nearest property line I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
feetI NO Close Approach feet 9799' MD / 8947' TVD
16. To be completed for deviated wells 17. Anticipated pressure (see 2O AAC 25.035 (e)(2))
Kickoff depth: 9110' MD Maximum hole angle 55° Maximum surface 2500 psig At total depth (TVD) 3400 psi~l @ 8800'
18. Casing program Settin~l Depth
size Specifications Top Bottom Quant~ of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
2-3/4" 2-3/8" 4.6# L-80 FL4S 799' 9000' 8350' 9799' 8947' 5 bbls
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth: measured 9675 feet Plugs (measured) PBTD tagged @ 9320' MD (9/08/1998)
tree vertical 8954 feet
Effective Depth: measured 9320 feet Junk (measured)
tree vertical 8639 feet
Casing Length Size Cemented Measured depth True Vertical depth
Conductor 110' 20" 558 Sx P F 110' 110'
Surface 2638' 13-3/8" 5074 Sx PF II 2710' 2710'
Production 6812' 9-5/8" 2000 Sx Class G & 100 Sx PF II 6884' 6804'
Liner 2610' 5-1/2" 171 Sx Class G 9315' 8634'
Liner 679' 3-1/2" 67 Sx Class G 9675' 8965'
Perforation depth: measured 9586' - 9600'; 9602' - 9650'; (perfs are covered by sand plug topped by cement plug)
true vertical 8883' - 8885'; 8887' - 8931'. 0 JGiNAL.
20. Attachments Filing fee [~] Properly Plat r~ BoP Sketch ~] Diverler Sketch BI Drilling program r~
Drilling fluid progra.~ Time vs depth plot [~ Refraction analysis D Seabed report BI 20 AAC 25.050 requirements Fl
21. I hereby certify th~.~ foregoing is t~.Cct to the best of my knowledge Questions? Call Dan Kara @ 263-4837.
Signed ~~/ Title: AAI Coil Tubing Drilling Supervisor Date ~,,~-'"' j~'~l'' ':'''
Prepared by Paul Rauf 263-4990
Commission Use Onl}
Permit~l~eL 50-~::~..~-~..O /~'~"'~:~3 I Approval¢~te . ISeecoverletter
2- ~ I APl number ~'--/~"' ¢¢ If°r°therrequirements
Conditions of approval Samples required D Yes ~ No Mudlog required F~ Yes ]~ No
Hydrogen sulfidemeasures D Yes J~ No Directional surveyrequired ~ Yes E] No
Required working pressure for BOPE D2M; D 3M; D 5M; D 10M;D ~) 3500 psi for CTU
Other:
by order of ~__ /~,~ ,,,,
Approved by ORIGINAL SIGNED BY commissioner the commission Date
Robert N, Cl3nstenson
Form 10-401 Rev. 12/1/85 · Submit in triplicate
DS 5-01C
CT Sidetrack and Completion
Intended Procedure
Objective:
P&A well with 17 ppg cement. Mill window from mechanical whipstock.
Directionally drill a horizontal well from the existing wellbore. Complete with
2-3/8" cemented liner. Perforate appropriate intervals.
Intended Procedure:
· P&A existing interval. Install mechanical whipstock at 9110'.
Mill window from whipstock through both the 3-1/2" and 5-1/2" liners at
9110' md. Drill 10' of formation and perform leak-off test to 9.0 ppg, 0.5
ppg above the highest anticipated mud weight (8.5 ppg polymer mud).
Crossing of faults are anticipated. If lost circulation is excessive and cannot be
controlled with lost circulation material, plan on drilling ahead with water
without returns.
Directionally drill a conventional 2-3/4" (3" bi-center) well to access
Zone 1 reserves. Planned TD is 9799' md.
· Run 2-3/8" blank liner to TD, cement in place.
· Perforate, place on production.
Drilling fluids will be injected into disposal wells at Pad 3 or CC2A. ~
March 16, 1999
DS 5-01C
Potential Drilling Hazards
POST ON RIG
No H2S production has been measured from this well.
BHP: 3400 psi @ 8800' ss (7.4 ppg EMW), BHT 195 °F
(estimated values based on offset wells). No over pressured zones are anticipated.
Maximum anticipated WHP w/full column of gas: 2500 psi.
High perm, gas saturated intervals are expected throughout the Sadlerochit.
Crossing of faults are anticipated. Be prepared for lost circulation. If losses are
excessive and cannot be controlled with lost circulation material, plan on drilling
ahead with water without returns.
March 16, 1999
DS C .... 01C PROPOSED CT SIDETr ..... CK
50' 4-1/2" HES HXO
SVLN SSSV
· 13-3/8" Shoe 2710'
9-5/8" x 4-1/2" Packer 6664'
4-1/2" Tubing BTM
@ 6720'
9-5/8" Casing BTM
@ 6884'
Mechanical
Whipstock Set @
-9110'
5-1/2" Shoe 9315'
P&A'd 3-1/2" Liner up to
9125' with 15.8 ppg
Cement
Sand
Mill Window in 3-1/2" x 5-1/2"
Liner Lap @ 9110'
2-3/4" Open
Hole
2-3/8" FL4S Liner-
Cemented & Perforated
3-1/2" Shoe 9675'
TD @ 9800'
Created by planner
Do~e plotted: 15-Mar-99
=let. Reference is §-0lA Version ~3 20DLS INC55.
Coordinetes ere in feet. reference 5-01.
True Vertical Depths ere reference rarefy table.
--- Baker Hughes INT£0 ---
ARCO Alaska, Inc,
Slot · 5-01
Location · North Slope, Alaska
Sfrucfure· D.S. 5
Field · Prudhoe Boy
8100
8200
85OO
8400
8500
8600
8700
8800
I 8900
v
gO00
9100
9200
400 300 200
i i i i i i i i i i i i i i i i i i
East (feet) ->
100 0 1 O0 200 300 400 500
- 2400
o T1
23OO
2200
z
2100 0
--i-
2000
19o0
1800
1700
ETie on - 26.1.5 Inc, 9050.00 Md, 8.396.45 Tvd, 1529.16 Vs
nd of Build/Turn - 27.49 Inc, 9110.00 Md, 8450.00 Tvd, 155,3.47 Vs
o Tvd, 1648.03 Vs
T.D. & End of Build/Turn - 55.01 Inc, 9798.67 Md, 8875,00 Tvd, 2078,23 Vs
i i i i i i i i i i i i i i i i i i i i i i i 1
1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400
Vertical Section (feet) ->
Azimuth 340.00 with reference 0.00 N, 0.00 W from 5-01
ARCO Alaska, Inc.
D.S. 5
5-01
Prudh0e Bay
North Slope, Alaska
PROPOSAL LISTING
by
Baker Hughes INTEQ
Your ref : 5-01C Version #3 20 DLS
Our ref : prop35
License :
Date printed : 15-Mar-99
Date created : il-Mar-99
Last revised : 15-Mar-99
Field is centred on 708179.340,5930615.440,999.00000,N
Structure is centred on 696997.000,5951440.940,999.00000,N
Slot location is n70 15 52.977,w148 23 52.292
Slot Grid coordinates are N 5948981.100, E 698143.000
Slot local coordinates are 2489.13 S 1081.28 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ARCO Alaska, Inc.
D.S. 5,5-01
Prudhoe Bay,North Slope, Alaska
PROPOSAL LISTING Pa~e 1
Your ref : 5-01C Version #3 20 DLS
Last revised : 15-Mar-99
Measured Inclin Azimuth True Vert R E C T A N G U L A R Dogleg Vert G R I D C O O R D.S
Depth Degrees Degrees Depth C 0 0 R D I N A T E S De~/100ft Sect Eastin~ Northing
9050.00 26.15 8.32 8396.45 1739.98N 309.57E
9075.00 26.69 6.42 8418.84 1751.01N 311.00E
9100.00 27.26 4.60 8441.12 1762.30N 312.08E
9110.00 27.49 3.89 8450.00 1766.88N 312.42E
9125.00 30.16 1.02 8463.14 1774.10N 312.73E
9150.00 34.73 357.15 8484.24 1787.51N 312
9175.00 39.40 354.09 8504.18 1802.52N 311
9200.00 44.13 351.58 8522.82 1819.03N 309
9225.00 48.91 349.47 8540.02 1836.92N 306
9250.00 53.72 347.64 8555.64 1856.04N 302.
0.00 1529.16 698406.91 5950728.49
4.01 1539.04 698408.04 5950739.55
4.01 1549.28 698408.83 5950750.86
4.01 1553.47 698409.05 5950755.45
20.07 1560.15 698409.17 5950762.68
.48E 20.07
.31E 20.07
.22E 20.07
.22E 20.07
34E 20.07
1572.83 698408.57 5950776.07
1587.34 698407.01 5950791.05
1603.57 698404.48 5950807.50
1621.40 698401.02 5950825.30
1640.70 698396.64 5950844.31
9256.62 55.00 347.20 8559.50 1861.28N 301.17E 20.07 1646.03 698395.33 5950849.53
9275.00 54.88 346.22 8570.06 1875.93N 297.71E 4.42 1660.97 698391.49 5950864.07
9300.00 54.74 344.88 8584.47 1895.71N 292.61E 4.42 1681.31 698385.87 5950883.72
9325.00 54.61 343.53 8598.92 1915.34N 287.06E 4.42 1701.65 698379.81 5950903.19
9350.00 54.49 342.18 8613.42 1934.80N 281.05E 4.42 1721.99 698373.30 5950922.48
9375.00 54.39 340.83 8627.96 1954.08N 274.60E 4.42 1742.32 698366.35 5950941.59
9400.00 54.30 339.47 8642.54 1973.19N 267.71E 4.42 1762.63 698358.95 5950960.51
9425.00 54.23 338.11 8657.14 1992.11N 260.37E 4.42 1782.92 698351.12 5950979.23
9450.00 54.18 336.75 8671.76 2010.83N 252.58E 4.42 1803.18 698342.85 5950997.74
9475.00 54.14 335.39 8686.40 2029.36N 244.36E 4.42 1823.39 698334.15 5951016.04
9500.00 54.11 334.03 8701.05 2047.67N 235.71E 4.42 1843.56 698325.02 5951034.13
9525.00 54.10 332.66 8715.71 2065.77N 226.62E 4.42 1863.68 698315.46 5951051.98
9550.00 54.11 331.30 8730.36 2083.65N 217.11E 4,42 1883.73 698305.48 5951069.60
9575.00 54.13 329.93 8745.02 2101.30N 207.17E 4.42 1903.72 698295.09 5951086.98
9600.00 54.17 328.57 8759.66 2118.71N 196.81E 4.42 1923.63 '698284.28 5951104.12
9625.00 54.22 327.21 8774.28 2135,89N 186.03E 4.42 1943~45 698273.05 5951121.00
9650.00 54.29 325.85 8788.89 2152.81N 174.84E 4.42 1963.18 698261.42 5951137.63
9675.00 54.37 324.49 8803.47 2169.48N 163.24E 4.42 1982.81 698249.39 5951153.99
9700.00 54.47 323.14 8818.01 2185.89N 151.24E 4.42 2002.34 698236.96 5951170.08
9725.00 54.58 321.79 8832.52 2202.04N 138.83E 4.42 2021.75 698224.14 5951185.89
9750,00 54.71 320.44 8846.98 2217.91N 126.03E 4.42 2041.05 698210.93 5951201.42
9775.00 54.86 319.10 8861.40 2233.50N 112.84E 4.42 2060.21 698197.34 5951216.66
9798.67 55.01 317.83 8875.00 2248.00N 100.00E 4.42 2078.23 698184.12 5951230.82
Ail data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from 5-01 and TVD from rotary table.
Bottom hole distance is 2250.22 on azimuth 2.55 degrees from wellhead.
Vertical section is from wellhead on azimuth 340.00 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
D.S. 5,5-01
Prudhoe Bay,North Slope, Alaska
PROPOS~J~ LISTING Page 2
Your ref : 5-01C Version #3 20 DLS
Last revised : 15-Mar-99
Targets associated with this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Ti 698000.000,5951250.000,999.00 8875.00 2271.99N 83.57W il-Mar-99
C T Drilling Wellhead Detail
Methanol Injection
Otis 7" WLA
Quick Connect -
~ CT Injector Head
~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure
~ I "-' 7" Riser
I I
I
Annular BOP (Hydril),7-1/16" ID
5000 psi WP
Alignment Guide Flange
7-1/16", 5M Ram Type Dual
Gate BOPE
Flanged Fire Resistant
Kelly Hose to Dual HCR
Choke Manifold
Man
Cutters or
Combination Cutter/Blinds
Slip/Pipe Rams
Manual Valves Drilling spool 7-1/16", 5M
by 7-1/16", 5M
Manual over Hydraulic
Ram Type Dual Gate BOPE
7-1/16" ID with
Pipe/Slip Rams
Manual Master Valve
0.458' (5.5")
ri
2" Pump-In
Hanger
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on DS Hardline to Standpipe
manifold
9-5/8" Annulus
13-3/8" Annulus
PAUL RAUF 015412452359 1 0 5
ARCO ALASKA INC,
P. O. BOX 100360 ATO - 1509 2-1/710
ANCHORAGE, AK 99510-0360 ~f~ate
~ to the
2 ?-,R 5
,,~ NOT VALID FOR OVER $1000.00
0~05 ~
OFIR.~I' CHICAGO
The First National Bank of Chicago
Chicago, Illinois 60670
m:O ? ~,OOOO ~, tm-' 90
WELL PERMIT CHECKLIST
FIELD & POOL 6 ~'"4::3/~",,,~
COMPANY
ADMINISTRATION
T
ENGINEERING
APPR DATE
WELL NAME /~/ O~-0/~.. PROGRAM: exp~dev ?~, redrll ~ serv~
INIT CLASS
GEOL AREA
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
¥ N
Cu
wellbore seg ann. disposal para req ~
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
GEOLOGY
ANNULAR DISPOSAL
APPR DATE
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diver/er required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to '.~5'--O ~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
Permit can be issued w/o hydrogen sulfide measures ..... Y
Data presented on potential overpressure zones ....... YY ~~,~"~
Seismic analysis of shallow gas zones .............
Seabed condition survey (if off-shore) ............. N
Contact name/phone for weekly progress reports [exploratory only~ Y N
30.
31.
32.
33.
34.
35. With proper cementing records, this pla~/"'
(A) will contain waste in a suitable,~,c'(giving zone; ....... Y N
(B) will not contaminate freshw~at~r; or cause drilling waste... Y N
to surface;
(C) will not impair me~,l~nical integrity of t~used for disposal; Y N
(D) will not dama, a, ge'producing for~ impair recovery from a Y N
pool; and .~
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
UNIT# //~'...(,--~3 ON/OFF SHORE
GEOLq~GY:. ENGINEERING: UIC/_An_~_nu.,/~ COMMISSION:
JDH ~ RNC"-- ~-'
co ~ ~/(./~.~
Comments/Instructions:
c:\msoffice\wordian\diana\checklist
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~ape Subfiie 1 is type: LIS
**** REEL HEADER
MWD
99/ 9/20
BHI
01
LIS Customer Format Tape
**** TAPE HEADER
MWD
99/ 9/20
105263
01
1 3/4" NaviGamma - Gan~a Ray
LIS COMMENT RECORD(s):
~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~
_
Remark File Version 1.000
Extract File: Header.las
-Version Inforraation
VERS. 1.20:
w~eP. NO:
-Well Information Block
CWLS log ~qOTT qe:~=~F -VERSION 1.20
One line per frame
#MNEM.UNIT Data Tl~e Information
STRT.F 9145.0000: _Starting Depth
STOP.F 10130.0000: Ending Depth
~'~'~ ? 0.5000: Level e ...... ~ ....
.... ~.~
NULL. -999.2500: ~sent
COMP. COMPActlY: ARCO Alaska, inc.
wu~.~. WELL:
FLD . ~'zELD: Prudhoe Bay Unit
LOC . LOCATION: 2488~ YNL
......... North Slope
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 1 3/4" NaviGamma - Gamma Ray
REF . JOB REFERENCE: 105263
DATE. ~ .... 6 June 1999
AP1 . AP1 NUMBER: 500292013603
~Parameter Information Block
#MNEM. UNiT Value n .... -~ pe ~ ....
PT, ~ ~,,-,~, ~ ~4~ T~4~
SECT. 32 : Section
TO}~q.N lin · To'~ship
~EqG. !SE : Ran~
PDAT .....
. me~ : Permanent Datum
EPD .F 72.3 : Elevation Of Perm. Datum
LMF . KB : T.n.g ~ured From
~'u..~ 72.3 : Feet }~eove Perm. Datum
DMF KB : ,~-~.~ Measured From
EKE .F 72.3 : Elevation Of Kelly Bushing
EDF .F N/A : Elevation Of Derrick Floor
EGL .F N/A : Elevation Of Ground Level
CA~E.~ 9156 · Casing Depth
OSi . DiRECTiONAL : Other Services Line l
~Remarks
1) All depths are Measured Depths (MD) unless otherwise noted.
2) Ail depths are Bit Depths unless otherwise noted.
3) Ail Gamma Ray data (GRAX) presented is realtime data.
4) Well 05-01C was sidetracked @ 9156' MD (8416' SSTVD)~ from the
original wellbore of Well 05-01.
94 1999
Alaska 0i! & Gas Con~. uomm~.s~on
Aneomge
(5) The gap in the log from 9750' MD (8698' $STVD) to 9778' MD (8709'
SSTVD) is due to a depth adjustment applied after a tie in.
(6) The section from 9778' MD (8709' SSTVD) to 9804' MD (8721' SSTVD)
was relogged due to a malfuntion while restoring the data.
(7) Well 05-01C was drilled to 10130' MD (8930' SSTVD) on Run 13. The
TD was depth shifted to 10145' MD (8930' SSTVD) after a tie-in.
(8) The interval from 10113' MD (8917' SSTVD) to 10130' MD (8930' SSTVD)
was not logged due to sensor to bit depth.
(9) The Gamma Ray log has been depth shifted to match the Schlumberger's
MCNL Gamma Ray logged on 09 June 1999.
(10) A Magnetic Declination correction of 27.86 degrees has been applied
to the Directional Surveys.
-Mnemonics
GRAX
ROPS
TVD
~Sensor Offsets
RUN GAMMA
5 16.84 ft.
6 16.84 ft.
7 16.84 ft.
8 16.50 ft.
9 16.61 ft.
12 16.58 ft.
13 16.58 ft.
-> Gamma Ray MWD-API [MWDI (MWD-API units)
-> Rate of Penetration, feet/hour
-> True Vertical Depth, feet
DIRECT I ONAL 21 83 ft
21 83 ft
21 83 ft
21 49 ft
21 60 ft
21 57 ft
21 57 ft
Tape Subfile: !
Minimum record length: 14 bytes
Maximum record length: 132 bytes
[]
Tape Subfile 2 is tpe: LIS
FILE HEADER ****
MWD .001
1024
INFORMATION TABLE: CONS
MNEM VALU
LCC 150
CN ARCO Alaska, Inc.
~ 05-01C
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
LIS COMHENT RECORD(s):
~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~
! ! ! !!! !!!!! ! ! !!! !!! Remark File Version 1.000
1. The data presented here has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by ARCO Alaska,
Inc.
3. The PDC used is the Schlumberger's MCNL data, dated June 9, 1999.
INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
__
i GR G PJ~i,~[ 0.0
2 ROP
ROPS
0.0
* FORMAT RECORD (TYPE# 64)
Entry Tpe 1) Size( 1) Repcode 66
Data record type is: 0
Entry Type 2) Size( 1) Repcode 66
Datum Specification Block Type is: 0
Entry Tpe 3) Size( 2) Repcode 79
Datum Frame Size is: 12 bytes
Entry Type 4) Size( 1) Repcode 66
Logging direction is down (value= 255)
Entry Tpe 5) Size( 1) Repcode 66
Optical Log Depth Scale Units: Feet
Entry Type 8) Size( 4) Repcode 68
Frame spacing: 0.500000
Entry Type( 9) Size( 4) Repcode 65)
Frame spacing units: iF ]
fndun c [F ] 1.00000000 3
Entry Type( 11) Size( 4) Repcode( 68)
Number of frames per record is: 84
Entry Type( 13) Size( 1) Repcode( 66)
One depth per frame (value= 0)
Entry Type( 16) Size( 1) Repcode( 66)
Datum Specification Block Sub-tpe is:
Entry Block terminator.
Summary of entry types encountered:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1
Rep Code Count Bytes
68 2 8
Sum: 2 8
fndun a [F ] 1.00000000
[]
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units Size
API AP1 AP1 API
Log Crv Crv
Length Typ Tp Cls Mod
1 GR MWD
2 ROP
68 1 API 4
-68 i 4
4 99 995 99 1
4 99 995 99 !
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 24
Tape File Start Depth = 9145.000000
Tape File End Depth = 10135.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 66 1 datum
Rep Code: 68 5947 datums
Rep Code: 79 2 datums
Minimum record length: 54 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
MWD .001
1024
INFORMATION TABLE: CONS
MNEM VALU
LCC 150
CN ARCO Alaska, Inc.
~ 05-01C
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
LiS COMMENT RECORD(s):
~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~
! ! !! ! ! ! !! !!! !! !! !! ! Remark File Version 1.000
1. The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
! G~Ai{ GP3Z{ 0.0
2 ROPS ROPS 0.0
FORMAT RECORD (TYPE# 64
Entry Tpe l) Size 1
Data record type is:
Entry Tpe 2) Size 1
Datum Specification Block
Entry Type 3) Size 2
Datum Frame Size is:
Entry Type 4) Size 1
Logging direction is down
Entry Type 5) Size 1
Repcode 66)
0
Repcode 66)
Type is: 0
Repcode 79)
4o bytes
Repcode 66)
(value= 255)
Repcode 66)
Optical Log Depth Scale Units: Feet
Entry Type 8) Size 4 Repcode 68)
Frame spacing: 0.500000
Entry Tpe 9) Size 4 Repcode 65}
Frame spacing units: [F ]
fndun c IF ] 1.00000000 3
Entry Type( 11) Size( 4) Repcode( 68)
Number of frames per record is: 84
Entry Type( 13) Size( 1) Repcode( 66)
One depth per frame (value= 0)
Entry Type( 16) Size( 1) Repcode( 66)
Datum Specification Block Sub-type is:
Entry Block terminator.
Summary of entry tpes encountered:
1 2 3 4 5
1 1 1 1 1
Rep Code Count
68 2
Sum: 2
fndun a [ F ]
[]
FRA~4E SPACE =
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
7 8 9 10 11 12 13 14 15 16
0 1 1 0 1 0 1 0 0 1
Bytes
8
8 8
1.00000000 3
0. 500 * F
Name Tool Code Samples Units Size
i G~ ~,iD 68 i 4
2 ROPS ~D 68 i 4
* DATA RECORD (TYPE~ 0) 1014 BYTES *
Total Data Records: 24
AP1 API AP1 AP1
Log Crv Crv
Length Tp Tp Cls Mod
4 99 995 99 !
Tape File Start Depth = 9145.000000
Tape File End Depth = 10135.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 66 1 datum
Rep Code: 68 5947 datums
Rep Code: 79 2 datums
Tape Subfile: 3
31 ..... d ....
Minimum record length: 54 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
**** TAPE TRAILER ****
MWD
99/ 9/20
105263
01
**** REEL TRAILER ****
MWD
99/ 9/20
BHI
01
T~p: c:,~i~: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Hon 20 SEP 99 11:44a
Elapsed executien time = 1.32 seconds.
SYSTEM RETURN CODE = 0
Tape Subfile i is ~_.~e: LiS
Tape Subfile 2 is Uype: LiS
9145.0000 -999.2500 -999.2500
9145.5000 -999.2500 -999.2500
9200.0000 42.3400 83.7000
9300.0000 23.3600 11.9500
9400.0000 30.6170 98.4850
9500.0000 25.5220 64.2000
9600.0000 23.3600 72.0780
9700.0000 115.3400 82.0860
9800.0000 25.0800 -999.2500
9900.0000 24.6820 34.8090
10000.0000 62.3200 76.7770
10100.0000 143.6400 33.7230
10135.0000 -999.2500 17.3000
Tape File Start Depth = 9145.000000
Tape File End Depth = 10135.000000
Tape Pile Level Spacing = 0.500000
Tape File Depth Units = Feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9145.0000 -999.2500 -999.2500
9145.5000 -999.2500 -999.~500
9200.0000 46.7200 83.7000
9300.0000 26.7670 11.3000
9400.0000 30.6600 99.1990
9500.0000 30.6600 65.4000
9600.0000 23.9800 65.5030
9700.0000 96.3600 138.4000
9800.0000 95.7600 -999.2500
9900.0000 45.6000 78.2000
10000.0000 50.1600 48.0960
1010,0.0000 152.0000 12.0000
10135.0000 -999.2500 -999.2500
Tape File Start Depth = 9145.000000
Tape File End Depth = 10135.000000
/ape File Level Spacing = 0.500000
Tape File Depth Units = Feet
Tape Subfile 4 is type: LIS
!999
Oil & Gas -Cons. Commission