Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout207-049Ima e P~ect Well Histo File Co~r Pa e
9 J rY J
XHVZE
This page identifies those items that were not scanned during the initial produ~tion scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~~- Q~-~ Well History File Identifier
' III III (II II I III I III I I'l ll II I IIII )
O anizin ~aone~
r9 g wo-sided (II II
^ Rescan Needed
RE AN DIGITAL DATA OVERSIZED (Scannable)
Color Items: Diskettes, No. ~ p Maps:
~reyscale Items: ^ Other, No/Type: p Other Items Scannable by
a Large Scanner
^ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: Maria Date: ~ ~ ~S~
Pro'ect Proofing
! II I II'III II III I I(II
BY: Maria Date: 3O Q /sl
ti x 30
~ =~Q~ + ~~ = TOTAL PAGES ~
on
Scanning Prepara _
_
(Count does not include cove sheet)
BY: _ Maria Date: rJ/ 3D IOq ~S~ ~
Production Scanning
Stage 1 Page Count from Scanned File: (count aoes ~nciude cover sneet)
Page Count Matches Number in Scanning Preparation: ~ YES NO
BY: Maria Date: 3O D ~S~ 1~ 1~
7 ~
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: ~S~
Scanning is complete at this point unless rescanning is required. I) I II II II I(I I) I I III
ReScanned III II'I~I~II~ ~I~II
BY: Maria Date: ~S~
Comments about this file: Quality Checked III II~III III II'I III
--~=-
10/6/2005 Well History File Cover Page.doc
,.
i
m~ Y u
~:;
F
t <.,
~,
MICROFILMED
6/30/2010
DO NOT PLACE
ANYNEW MATERIAL..
UNDER THIS~PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
z ~ J w~
DATA SUBMITTAL COMPLIANCE REPORT
6/22/2009
Permit to Drill 2070490 Well Name/No. PRUDHOE BAY UNIT 12-12A Operator BP EXPLORATION (ALASK/~ INC API No. 50-029-20610-01-00
MD 12650 ND 8700 Completion Date 6/20/2007 Completion Status 1-OIL Current Status 1-Oll UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: USIT / CBL / CCL, DIR / GR ! RES / MWD / PWD, DIR / GR / RES / St (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
og Cement Evaluation 5 Col 1 100 3800 Case 6/20/2007 CIL CBL USIT, GPIT, GR, I
CCL 29-May-2007 ',
D Asc Directional Survey 0 12650 Open 7/5/2007 ',
r pt Directional Survey 0 12650 Open 7/5/2007
Log See Notes Blu 1 9969 10460 Case 7/30/2007 Mem Static Temp, Jewlery
Log, GR, CCL, Temp, Pres
5-Ju1-2007
ED C Lis 1560~nduction/Resistivity 3318 12649 Open 10/26/2007 LIS Veri, GR, ROP , FET,
RPS, DRHO, NPHI wlPDS
graphics
Log Induction/Resistivity 2 Blu 1 3318 12650 Open 10/26/2007 MD Vision Service,
Borehole Log 18-Jun-2007
` Log Induction/Resistivity 2 Blu 1 3318 12650 Open 10/26/2007 NO Vision Service, 18-
Jun-2007
Log InductionlResistivity 2 Blu 1 3318 12650 Open 10/26/2007 TVD Vision Service Sub
Sea, 18-Jun-2007
Weli Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
~
~
DATA SUBMITTAL COMPLIANCE REPORT
6/22/2009
Permit to Drill 2070490 Well Name/No. PRUDHOE BAY UNIT 12-12A
MD 12650 TVD 8700
ADDITIONAL IPFORMATION
Well Cored? Y / N
Chips Received? Y / N
Analysis Y / N
Received?
Operator BP EXPLORATION (ALASKly INC
Completion Status 1-OIL Current Status 1-OIL
\
Daily History Received? ~
Formation Tops ~N
API No. 50-029-20610-U1-00
UIC N
Completion Date 6/20/2007
Comments:
~1 ~ ~A~!~~, ~V~ ~
Compliance Reviewed By: Date: ~
~
10/19/07
Schtumber~er
NO. 4449
Alaska Data 8 Consulting Services Company: State ot Alaska
2525 Gambeu Street, Suite a0o Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Well Jnh i! 1 nn ne ..~~.... n...,. n~ n-'--
MPL-09 11767141 MEM INJECTION PROFILE 09/16/07 1
S-400A 40U15442 OH MWD/LWD EDIT ~ 09/14/07 1
12-12A 40015307 OH MWD/LWD EDIT 06/18/07 3 1
G-17A 40013619 OH MWD/LWD EDIT - "R 06/18/07 3 1
S-400A 11855508 CH EDIT PDC GR (USIT) ~ 09/18/07 1
G-268 10942213 MCNL "-- L ~ OS/23/05 1 1
C-32C 11628756 MCNL ~ 02/18l07 1 1
E-04A 11801079 RST / ~ 06/23/07 1 1
07-07B 11216202 MCNL (p - Q 06/28/06 1 1
L2-11 11209603 MCNL ~ p 04/30/06 1 1
E-32A 11767130 MCNL _ ~/5'(ep~ ~ 06/19/07 1 1
L-04 11603118 MCNL - 12/30/06 1 1
E-19B 11767134 MCNL ~- - ~~ 'P" )S(p V ~ 07/21/07 1 1
2-16/M-16 11846803 RST V - L Q(~ 08/13/07 1 1
1-39AlN-16 11628769 MCNL ~ ~ 04/15/07 1 1
_..~~ r...........~~...... ~.~..~~. ~.... v.v~.u.v ru.v ~~~ ~ v~vm~v v~~~ vvr ~ ~irvn ~ v.
BP Exploration (Alaska) Inc.
Petrotechnica~ Data Center LR2-1 ' °' ` ~
900 E. Benson Blvd. ,,, , .~ .,.-, ,.
Anchorage, Alaska 99508
n-
Date Delivered: r ~'~ ~~ )~, : f
Alaska Data & Consulting Services
2525 Gambell Street, Suite 4 0
Anchorage, AK 99503- 3 ;
ATTN: Beth
Received by: ~
~
~.
~
Saltmarsh, Arthur C (DOA)
~ Page 1 of 1
From: Hubble, Terrie L [Terrie.Hubble@bp.com]
Sent: Monday, August 13, 2007 2:00 PM
To: Saltmarsh, Arthur C (DOA)
Subject: PBU 12-12A / PTD # 207-049
H ~ art,
Please reference #he follawing well:
Well Name: PBU 12-12A
Permit #: 2Q7-049
API #: 50-029-20610-01-00
Top Perf MD: 10485'
Battom PerF MD: 12646'
This well began Production on July 18, 2007
Methad of Operations is: Gas Lift
Date of Test: July 18, 2007
Hours Tested: 8
24-Hour Rate / Oil-Bbl: 991
24-Hour Rate / Gas-Mcf: 2,276
24-Hour Rate / Water-Bbl: 19
Test Rate / Oi1-Bbl: 330
Test Rate / Gas-Mcf: 759
Test Rate / Water-Bbl: 6
Choke Size: 128
Gas-Oil Ration: 2,297
Flow Tubing Pressure: 193
Casing Pressure: 10
Oil Gravity-API: Unavailable
8/13/2007
~
` J
a~
~i~~1~~~~~l~l~~
Alaska Data & Consulting Services
2526 Gambell Street, Suite 400
Anchorage, AK 99603-2838
ATTN: Beth
w2u _~oh ~t
1 nn ne ..s:..
~~ ~ - .~.~~ 1
NO. 4346
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Endicott
n..a..
o~iz~io~
3-251L-27 11686762 STATIC PRESSURE SURVEY 07/09/07 1
4-18/S-30 11813062 STATIC PRESSURE SURVEY 07/10l07 1
2-50/U-08 11676953 LDL 07/13/07 1
1-611Q-20 11695066 SBHP SURVEY O7l93l07 1
3-41/K-39 11846795 WFL 8 PRESS GRADIENT 07/17/07 1
7-41/0-23 11695068 INJECTION PROFILE 07/24/07 1
3-41/K-39 11846795 IPROF 8~ JEWELRY 07/16/07 1
L7-09 11626109 LDL 06/27/07 1
02-308 11626108 LDL 06/25/07 1
H-07A 11637346 LDL 06/30/07 1
12-OSA 11638649 FPIT 07/04/07 1
12-12A 11661162 MEM STATIC TEMP/JEWELRY 07/OSl07 1
P2-08 11686761 STATIC PRESSURE SURVEY 07/05l07 1
17-02 11745227 MEM GLS 07/10/07 1
09-11 11686765 STATIC PRESSURE SURVEY 07/11/07 1
X-19B 11801075 LDL 06/19/07 1
MPK-30 11676952 FPIT 07/12/07 1
11-08 11813061 STATIC PRESSURE SURVEY 07/07/07 1
03-14A 11849926 BHP SURVEY O7/25/07 1
01-16 11630486 PROD PROFILE 06/28/07 1
MPH-17 11813063 CBL & IMAGE LOG 07/27/07 1
01-15A 11849924 USIT 07/20/07 1
02-306 11813058 USIT 07/04/07 1
MPJ-24 11638647 USIT 06/29/07 1
E-101 11630488 PRODUCTION PROFILE O6/30/07 1
G-18A
DI FACC Al~I[~.IAUn enr_~ o~ 11209612
rv~or ev c~~n. MCNL
~u~i. w 07/19/06 1 7
BP Exploration (Alaska) Inc. , v.......v v..~ vv. •~^v" , v.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambeli Street, Suite 400
Anchorage,AK 99503-2838
ATTN: Beth
Received by:
STATE OF ALASKA ~
ALASKA~IL AND GAS CONSERVATION COM~SSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~~~„~~~~~E~
.;~~1(~ 2 3 2007
. ;,, ~.„ ~ ~~~ a~ons. Commission
1a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended
zo,aac zs.,os 20AAC 25_110
^ GINJ ^ WINJ 0 WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ~`~
~ Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban ~
6/20/2007 ,•D~ 12. Permit to Drill Number
207-049 ~
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
6/3/2007~ 13. API Number
50-029-20610-01-00 ~
4a. Location of Well (Governmental Section):
Surface:
10
' FS
7
1' FEL
SE
~ 7. Date T.D. Reached
6/17/2007 / 14. Well Name and Number:
PBU 12-12A ~
15
L,
5
,
C. 18, T10N, R15E, UM
Top of Productive Horizon:
5179' FSL, 2125' FEL, SEC. 18, T10N, R15E, UM 8• KB (ft above MSL): 70.84
Ground (ft MSL): 15. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
436' FSL, 4175' FEL, SEC. 07, T10N, R15E, UM 9. Plug Back Depth (MD+ND)
12650 ~ 8700~ Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 696843 ~ y- 5931327 ~ Zone- ASP4 ~ 10. Total Depth (MD+n/D)
12650 - 8700' 16. Property Designation:
ADL 028329 ~
TPI: x- 695346 y_ 5935454 Zone- ASP4
Total Depth: x- 693280 y- 5935
3~I one- ASP4 11. SSSV Depth (MD+ND)
None 17. Land Use Permit:
~
18. Directional Survey ~ Yes ^ No
Submit electronic and rinted information r 20 AAC 25.050 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (ND):
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 7a~ ~ 3 M
USIT / CBL / CCL, DIR / GR / RES / MWD / PWD, DIR / GR / RES / Stratasteer / RES / AZI-DEN 33/D.e~' rYb
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH ND HOLE 'aM4UPfF
WT. PER FT. GRADE , TOP BOTTOM TOP BOTfOM SIZE GEMENTING RECL?RD PCILLED '
20" 91.5# H-40 Surface 110' Surface 110' 30" 300 sx Permafrost
13-3/8" 72# L-80 Surface 2664' Surface 2664' 17-1/2" 2750 sx Fondu 400 sx PF
9-5/8" 47# L-80 Surface 31 ' Surface 3111' 12-1/4" 500 Class ~G'
7" 26# L-80 24' 3213' 24' 3209' N/A Tieback: 64 sx Class 'G'
7" 26# L-80 3213' 10414' 3209' 8709' 8-1/2" 815 sx Lite 121 sx Class'G'
4-1/2" 12.6# L-80 10242' 12648' 8619' 8700' 6-1/8" Uncemented Slotted Liner
23. Open to production or inject ion? ~ Yes ^ No 2•4; TUBING RECORD'
If Yes, list each i
(MD+ND of Top & Bottom; Pe nteroal open
rforation Size and Number): Size DePTH SeT MD PACKER SET MD
4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr-80 10251' 10194'
MD TVD MD TVD
10485' - 11742' 8734' - 8699' 25. ACia, ~~acru~~, C~nrr SQUE~, ~c.
~'I HZZ' - 12646~ SF>JH~ - H7OO~ DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED
Freeze Protected with 75 Bbls of Diesel
ZB. PRODUCTION TEST
Date First Production:
Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test:
7/18/2007 Hours Tested:
$ PROOUCr~or, FoR
TEST PERIOD OIL-BBL:
330 GAS-MCF:
759 WATER-BBL:
6 CHOKE SIZE:
128 GAS-OIL RATIO:
2,297
Flow Tubing
Press. 193 Casing Press:
10 Ca~cu~.a,reo
24-HOUR RATE• OIL-BBL:
991 GAS-MCF:
2,276 WATER-BBL:
19 OIL GRAVITY-AP) ~CORR~:
Z7. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ IVo Sidewal l Core s Ac uired? ^ Yes ~ No
If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
COMr LETiON
None ~.~~C~~
~.--._
~
~
Form 10-407 Revised 02/2007 ~[~ ~ G~~ / 1~TINUED ON REVERSE SIDE ~S B~L aUG ~j ~~DO/ /.y
~ ` ~ lJ
ZS. GEOLOGIC MARKERS ~LIST ALL FORMATIONS AN ERS ENCOUNTERED~: 29. FORMATION TESTS
' NAME TVD Well Teste . ^ Yes ~ No
Permafrost Top If yes, list intervals and formatio~s tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
PermafrOSt BaSe detailed test information per 20 AAC 25.071,
Ugnu 4 4880' 4645' None
Ugnu 4A 4918' 4675'
Ugnu 3 5035' 4764'
Ug~u 1 6031' 5535'
West Sak 2 6737' 6088'
West Sak 1 7047' 6329'
Colville Mudstone 3 7377' 6585'
Colville Mudstone 2 8032' 7111'
Colville Mudstone 1 9158' 7987'
H RZ 9563' 8239'
Base HRZ 9868' 8411'
LCU 10006' 8491'
Top of Sag River 10412' 8708'
Formation at Total Depth (Name):
Sag River 10412' 8708'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the fore oing is true and correct to the best of my knowledge.
O~
Signed Terrie Hubble Title Technical Assistant Date /t ~~D~
PBU 12-12A 207-049 Prepared By Name/Number. Sondra Stewman, 564-4750
Well Number Drilling Engineer: Mehrdad Nadem, 564-5941
Permit No. / A roval No.
INSTRUCTIONS
GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
ITea~ 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternati~g-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITeM 4b: TPI (Top of Producing Interval).
ITenn 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITea- 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28.
ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Irenn 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original On1y
BF~ E~PL~~ATIpN ~
F~~e 1~ 1
~ 3, ~
~
~ ~~ak-Off 7~st3 5umm~iry ~
~ ~
3~~ -
Legal Name: 12-12
Common Name: 12-12
'I"~tD~~e `.:.
~'es~l"YI~~
~ `'~est
~'MA)
~ ==T~~~
ti~p~la~~'I~) !~I!AW " Sur~f~c~sFrassur~ ~,~kt~f~?
~r~~sc~r~`(BHF~~ : ..
: ~Mt~
, €
EE ,.
. . , .
.~
5/31/2007 LOT 3,557.0 (ft) 3,539.0 (ft) 10.00 (ppg) 600 (psi) 2,438 (psi) 13.26 (ppg)
6/3/2007 LOT 3,318.0 (ft) 3,310.0 (ft) 9.60 (ppg) 590 (psi) 2,241 (psi) 13.03 (ppg)
6/13/2007 FIT ~(ft) (ft) (ppg) (psi) (psi) 13.03 (ppg)
6/14/2007 FIT 10,435.0 (ft) 8,717.8 (ft) 8.40 (ppg) 499 (psi) 4,303 (psi) 9.50 (ppg)
~
~
Printed: 6/28/2007 1:26:13 PM
, ~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
5/26/2007 00:00 - 16:30 16.50 MOB P
16:30 - 17:30 1.00 MOB P
17:30 - 00:00 6.50 RIGU P
5/27/2007 00:00 - 01:00 1.00 RIGU P
01:00 - 02:00 I 1.001 WHSUR I P
02:00 - 02:30 0.50 WHSUR P
02:30 - 03:00 0.50 WHSUR P
03:00 - 03:30 0.50 WHSUR P
03:30 - 08:00 4.50 KILL P
08:00 - 09:00 I 1.001 KILL I P
09:00 - 11:00 I 2.001 KILL I P
11:00 - 12:00 1.00 KILL P
12:00 - 13:00 1.00 BOPSU P
13:00 - 14:30 1.50 BOPSU P
14:30 - 16:00 1.50 BOPSU P
16:00 - 17:00 1.00 BOPSU P
17:00 - 19:00 2.00 BOPSU P
19:00 - 19:30 0.50 BOPSU~ P
19:30 - 00:00 4.50 BOPSU P
5/28/2007 I 00:00 - 01:30 I 1.50 I BOPSUp P
01:30 - 02:00 I 0.501 BOPSUR P
PRE Depart DS 01-05. Travel to DS 12-12.
PRE Arrive on location ~ 16:30 hrs. Move rig to 12-12 site.
PRE PJSM.
Spot rig over well ~ 17:30 hrs.
Rig up.
PRE Rig up circulation lines in the cellar and pressure test to 3500
psi.
DECOMP Take on fluids in pits.
Rig accepted ~ 01:00 hrs 5/27/076
DECOMP Pre-Spud meeting / PJSM.
DECOMP Service rig, mobilize, rig up DSM to pull BPV.
DECOMP Pull BPV.
DECOMP Circulate wellbore clean of freeze protection and other fluids.
Circulate in 8.5 ppg Seawater 104 gpm / 42 psi.
-Pump 450 bbls of heated Seawater ~ 8.5 ppg.
-Pump 50 bbls of Safe Surf-O / Seawater sweep.
-Displace well to 9.8 ppg NaCI Brine - 200 gpm / 225 psi.
DECOMP R/U & test Tbg x IA U 3500 psi - FAIL. Bled to -0 in 20
minutes.
DECOMP R/U Little Red Hot Oil Seroices.
Test OA U 2000 psi w/ diesel for 30 minutes.
- Final pressure 1900 psi - PASS.
R/D Little Red.
DECOMP Monitor IA on well losing- 5- bbls/hr.
DECOMP DSM - install BPV. Attempt to test f/ below to 1000 psi.
3" Grey valve packing on IA leaking - tightened packing.
Test BPV to 1000 psi f/ 10 minutes with mud pumps
maintaining 0.5 bpm on pump to maintain hole fill and 1000 psi.
- Pass.
L/D lubricator. Continue to keep hole full (IA) w/ 9.8 ppg NaCI
Brine.
DECOMP Cameron - dry rod TWC.
-1st test failed due to O-ring failure on Otis Cap.
-Retest to 1000 psi f/ 10 min - PASS.
R/D and blow down test equipment.
DECOMP PJSM w/ Cameron and crew.
N/D Tree & Adaptor flange.
DECOMP Inspect top connection on Tbg hanger.
Verified thread type on hanger.
5 7/8" RH ACME. 18 1/4 tums make up.
DECOMP PJSM.
N/U BOPE.
DECOMP R/U test equipment
DECOMP Test BOPs 250 / 3500 psi. w/ 4" & 5 1/2" test jts.
AOGCC Bob Noble declined to witness.
BP rep Dan Shearer and NAD TP Biff Perry witness test.
Brine wt = 9.8 ppg.
Total losses for the day = 83 bbls. 6.38 bph Average.
DECOMP Test BOPs 250 / 3500 psi. w/ 4" & 5 1/2" test jts.
AOGCC Bob Noble declined to witness.
BP rep Dan Shearer and NAD TP Biff Perry witness test.
DECOMP Biow down all lines.
R/D all testing equipment.
Printed: 6/28/2007 1:26:20 PM
, ~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
5/28/2007 02:00 - 04:00 2.00 BOPSU P
04:00 - 04:30 0.50 PULL P
04:30 - 05:00 0.50 PULL P
05:00 - 06:00 1.00 PULL P
06:00 - 08:00 I 2.00 I PULL I P
08:00 - 08:30 I 0.50 I PULL I P
08:30 - 14:45 6.25 PULL P
14:45 - 15:00 025 PULL P
15:00 - 15:15 025 BOPSU P
15:15 - 17:15 2.00 BOPSU P
17:15 - 17:30 0.25 BOPSUF~ P
17:30 - 18:30 1.00 BOPSUb P
18:30 - 20:30 2.00 BOPSU~ P
20:30 - 21:00 0.50 BOPSU P
21:00 - 22:00 I 1.001 BOPSUR P
22:00 - 22:30 0.50 DHB P
22:30 - 00:00 1.50 DHB P
5/29/2007 100:00 - 01:00 I 1.001 CLEAN I P
01:00 - 02:00 1.00 EVAL P
02:00 - 04:30 2.50 EVAL N
04:30 - 08:30 4.00 P
08:30 - 10:00 1.50 EVAL P
10:00 - 13:00 3.00 CASE P
13:00 - 14:00 I 1.001 CASE I P
DECOMP R/U DSM lubricator.
Puil TWC. R/D lubricator.
DECOMP R/U to unseat Tbg hanger and pull 5 1/2" Tbg.
DECOMP Back out lock down screws.
DECOMP Pull Tbg hanger above fioor.
Puli free w/ 175K. Up wt 83K.
Brine wt in hole 9.8 ppg
DECOMP CBU. 240 gpm / 90 psi.
Gas seen on bottoms up (Brine wt= 9.2 ppg @ B.U.)
Circ and condition Brine untill 9.8 ppg all the way around.
DECOMP UD hanger and jt of DP.
C/O elevators to pull 5 1/2" Tbg.
Up wt= 80K, SOW= 78K.
DECOMP POH, UD 5 1/2", 17#, L-80 Tbg.
Recovered:
-23 clamps, 23 pins & 6 SS bands.
-94 full jts & 1 cut off jt = 20.31'.
-1-GLM.
DECOMP R/D Tbg handling equipment.
DECOMP R/U BOPE test equipment.
DECOMP Test bottom pipe rams ( 2 7/8" x 5") variables, w/ 5" test jt.-250
/ 3500 psi.-PASS.
Attempt test w/ 4" test jt-SSSV control line port (SMR) leaking.
Mobilize Haliburton Storm Pkr.
DECOMP R/D and blow down test equipment.
DECOMP P/U 9- 6 1/4" DCs. M/U RTTS.
Up wt= 45K, SOW= 45K.
Set 80' below RKB. Test from above to 1000 psi. -PASS.
DECOMP Run in 4" test jt. Cameron remove SMR. Set test plug.
Verify set through SMR hole. Install SMR blanks.
DECOMP Test bottom pipe rams ( 2 7/8" x 5") variables, w/ 4" test jt.-250
/ 3500 psi.- PASS.
R/D and blow down test equipment.
DECOMP Back out RTfS. UD 2 jts DP, UD RTTS.
Rack back 3 stds 6 1/4" DCs.
Set wear ring.
DECOMP PJSM w/ SLB.
R/U E-line w/ 8 1/2" Gauge ring & Junk basket
DECOMP RIH w/ E-line, Hang up ~ 245' md - Not enough weight.
POH add weight bars. RIH work ~ 248' md, continue to RIH.
Tag 5 1/2" Tbg top ~ 3801' md ELM.
DECOMP Continue to run w/SLB E-line.
POH w/ Junk basket & Gauge ring.
Junk basket empty.
DECOMP RU USIT
SFAL DECOMP Run USIT/ CBL. Computer failres resulted in running the USIT
in teh hoel again.
DECOMP R/U & Run USIT/ CBL f/ 3,810' md to surface.
DECOMP Send logs to Town & consult w/ Town on next step.
DECOMP R/U & run EZSVi cementer on E-line to 3,564' md.
Set plug and POH.
DECOMP PJSM.
Printed: 6/28/2007 126:20 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
'Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
~~i Rig Name: NABORS 7ES Rig Number:
5/29/2007 13:00 - 14:00 1.00 CASE P DECOMP R/U & test 9 5/8" casing to 3500 psi / 30 minutes - PASS.
' R/D and blow down all lines and equipment.
14:00 - 17:30 3.50 CASE P DECOMP PJSM w/ HES hand & rig crew.
P/U Star Guide cement stinger. RIH picking up 5" DP U 3,561'
md.
17:30 - 18:30 1.00 CASE P DECOMP Circulate 212 bbls ~ 6 bpm / 135 psi to insure DP is clear of
debris.
' PJSM during circulation w/ BP reps, NAD TPs, SLB and rig
crew.
18:30 - 20:00 1.50 CASE C DECOMP Attempt to tag EZSV @ 3,564'md.
P/U singie, RIH, tag EZSV ~ 3,583' md. (19 ft deep).
Set down w/ stinger, open valve w/ 20K. PU= 90K. SOW= 95K.
20:00 - 20:30 0.50 CASE C DECOMP R/U cement head & manifold.
20:30 - 21:00 0.50 CASE C DECOMP Establish injection rate ~ 0.5 bpm / 1100 psi f/ 5 bbls.
I Unsting f/ EZSV.
21:00 - 22:00 1.00 CASE C DECOMP Close bag, S~B pump 5 bbls water to PT lines to 4000 psi.
Pump cement while holding 200 psi back pressure w/ Choke.
-5 bbls water.
-45 bbls of 15.8 ppg class "G" cement.
-10 bbls of 12.5 ppg Mud Push.
Sting into EZSV.
Rig pumps displace 63 bbls. As follows:
Start - 0.5 bpm / 760 psi. ~ 380 stks / 1285 psi. Open bag.
C~1 500 stks / 940 psi. Up rate to 1 bpm ~ 550 stks / 730 psi.
-700 stks / 480 psi. ~ 800 stks / 608 psi. ~ 900 stks / 729 psi.
-1000 stks / 800 psi.
Slow pump rate to 0.5 bpm. ~ 1050 stks 753 psi. ~ 1090 stks
/ 767 psi.
C.I.P. at retainer. 27 bbls of Cement through suspected leak at
3,810' md in casing.
22:00 - 22:30 0.50 CASE C DECOMP Circulate out excess Cement and Mud Push.
Pump- 238 bbls, received and dumped 30 bbls of Cement and
Mud Push contaminated brine returns.
22:30 - 00:00 1,50 CASE P DECOMP Monitor well - Static. POH w/ SLM to 1,603' md.
5/30/2007 00:00 - 01:00 1.00 CASE P DECOMP Continue to POH (SLM) f/ 1,603' md. UD Cement stinger.
No correction on SLM.
01:00 - 02:00 1.00 CASE P DECOMP Clean and clear rig floor. Senrice Rig: Top drive, Draw works
and Koomey.
02:00 - 02:45 0.75 CASE N DPRB DECOMP PJSM on rigging up SLB.
Rig up SLB E-liners.
02:45 - 05:30 2.75 CASE N DPRB DECOMP RIH w/ SLB E-line. Confirm depths and collar locations.
-SLB= 3,565' md. - DP= 3,583' md.
Confirm EZSV is 35' md below casing collar.
E-line depth correction is 18 ft.
05:30 - 08:00 2.50 STWHIP P WEXIT PJSM w/ Rig crew,Baker hand and BP rep.
P/U & M/U Whipstock and Miliing BHA, RIH.
08:00 - 11:30 3.50 STWHIP P WEXIT P/U 17 jts of 5" HWDP f/ shed. RIH U 894' md.
Continue to RIH from Derrick w/ 5" DP to 3,537' md. M/U Top
drive.
Pump 520 gpm / 1150 psi. Circulate 1 DP volume.
Orient Whipstock 5 degrees left of high side.
RIH, tag @ 3,559' md. Set down 10K / 23' high. Check logs.
Whipstock sitting across collar.
Printed: 6/28/2007 126:20 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
5/30/2007 11:30-15:00 3.50 STWHIP N DPRB WEXIT
15:00-16:15 1.25 STWHIP N DPRB WEXIT
16:15-16:30 0.25 STWHIP N DPRB WEXIT
16:30 - 18:00 1.50 STWHIP N DPRB WEXIT
18:00 - 21:30 3.50 STWHIP N DPRB WEXIT
21:30-23:00 1.50 STWHIP P WEXIT
23:00-OO:OO I 1.OO~STWHIPIN I IWEXIT
5/31/2007 I00:00 - 01:00 I 1.001 STWHIPI N ( DPRB I WEXIT
01:00-02:30 1.50 STWHIP N DPRB WEXIT
02:30 - 04:00 1.50 STWHIP P WEXIT
04:00-05:00 1.00 STWHIP N DPRB WEXIT
05:00-06:00 1.00 STWHIP N DPRB WEXIT
06:00 - 06:15 0.25 STWHIP N DPRB WEXIT
06:15 - 08:00 1.75 STWHIP N DPRB WEXIT
08:00-10:30 2.50 STWHIP N DPRB WEXIT
10:30-11:00 0.50 STWHIP N DPRB WEXIT
11:00-12:00 I 1.OOISTWHIPIN IRREP ~WEXIT
12:00 -
~\'~~1~~ 16:30 - t8:00 i.50 STWHIP P WEXlT
\
IJ "y 18:00 - 19:00 1.00 STWHIP P WEXIT
C~
cri,' ~.'~
~ ~t
~~ ~~C
POH w/ Whipstock.
PJSM w/ BP rep, Baker hand and crew.
L/D Whipstock.
Inside the trip anchor of
Whipstock is packed off with firm contaminated
Mud Push and Cement.
Clean and clear floor.
PJSM.
P/U -clean out / casing scraper BHA.
PJSM.
P/U 5" DP, RIH to 3,500' md.
PJSM.
Cut 54' of drilling line, adjust brakes on draw works.
Service Top drive, service Crown.
RIH, tag cement ~ 3,559' md. Break circulation.
190 gpm / 154 psi stage up to 500 gpm / 900 psi.
Up wt= 120K, SOW= 115K, ROT wt= 120K, RPM= 20, Tq= 1 K.
Clean out cement f/ 3,559' md to 3,570' md w/ RPM= 60, Tq=
2.5K.
Continue to ciean out cement. 500 gpm / 920 psi.
RPM= 60, UP wt= 175K, SOW= 115K.
Tagged top of EZSV @ 3,580' md.
Pick up, shut down pumps and rotary, set down 40K-OK.
Stand back 1 stand of DP.
R/U & test 9 5/8" casing to 3500 psi. - PASS.
R/D test equipment.
Displace well to new 10.0 ppg LSND from M-I mud plant.
250 gpm / 860 psi. 237 bbls hole volume.
POH from 3,580' md to 757' md, for Whipstock.
UD " Clean-OuY' BHA
PJSM w/ Baker rep, WSL and rig crew on P/U and running
W hipstock.
P/U & M/U Whipstock & BHA, RIH.
RIH w/ Whipstock & Milling assembiy to 3,541" md.
M/U Top Drive, Orient 14 degrees left of top center, RIH.
Up wt=120K, SOW=115K, GPM= 500.
Tagged piug ~ 3,579' md. Set down 25K, sheared Pin on
W hipstock.
P/U with no excess weight. Set down 40K, set trip Anchor.
Change out Gilmore valve on Accumulator. For annular
pressure control.
Cut window from T W= 3,557' md to B W=3,567 'md.
Rot wt= 116K, RPM= 80, GPM= 500, PSI= 860, WOM= 6K,
Tq= 4-5K. '
Drill to 3,586'. (Gauged hole depth = 3,582' md).
Total wt of recovered metal = 276 Ibs.
Work mill through window several times, with and without
rotation.
No problems. Pump 10.0 ppg Super Sweep with a 10%
increase in cuttings returns when back at surface.
R/U and perform FIT / LOT.
Mud wt= 10.0 ppg, TVD= 3,539' tvd, LOT= 600 psi.
EMWT= 13.26 ppg.
Printed: 6/28/2007 12620 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
5/31/2007 19:00 - 21:00 2.00 STWHIP P WEXIT POH from 3,557' md.
21:00 - 22:15 125 STWHIP P WEXIT UD (9)- 6 1/4" DC's. UD MWD, Jars, UBHO, and Milling
assembly.
Mills in gauge.
22:15 - 22:30 0.25 STWHIP P WEXIT Clean & clear Rig floor.
22:30 - 23:30 1.00 STWHIP P WEXIT Pull wear ring. M/U Stack Jetting tool.
Function BOP's. Jet Stack. B/D lines.
Install wear ring.
23:30 - 00:00 0.50 STW HIP P W EXIT P/U DP to 125' md.
6/1/2007 00:00 - 02:00 2.00 STWHIP P WEXIT Pick up 5" drill pipe and stand in derrick.
Prepare tools and rig floot to pick up BHA.
02:00 - 04:00 2.00 STWHIP P WEXIT Pick up new 8 1/2" PDC bit and Driiling Rotary Steerable Power
drive BHA (RSS).
04:00 - 08:00 4.00 STWHIP P WEXIT RIH to window at 3,557' with drilling BHA picking up 5" drill pipe
in singles. Shallow test MWD.
08:00 - 08:30 0.50 STWHIP P WEXIT Seroice top drive
08:30 - 10:00 1.50 STWHIP P WEXIT POH to 3485'. RIH to top of 9 5/8" window MAD pass to tie-in
GR logs.
10:00 - 11:00 1.00 STWHIP P WEXIT Slowly lower bit and BHA to window at 3357' and across
Whipstock slide.
Tag up 3' from bottom of window. Work BHA and attempt to
pass through window. No success
11:00 - 13:30 2.50 STWHIP N DPRB WEXIT POH with RSS driiling BHA.
Mud weight 10.0 ppg
13:30 - 15:00 1.50 STWHIP N DPRB WEXIT Stand back drilling BHA, 5" HWDP and drill caoolars. Lay
down RSS, MWD and bit.
PDC bit damaged on all 6 blades in the shoulder area.
15:00 - 16:30 1.50 STWHIP N DPRB WEXIT Pick up clean-out milling BHA, Baker 8 1/2" starting mill, 5" flex
joint and 8 1/2" upper Watermellon mill. RIH with HWDp to
603'.
16:30 - 17:15 0.75 STWHIP N DPRB WEXIT RIH with clean-out milling BHA to 3535'
17:15 - 22:45 5.50 STWHIP N DPRB WEXIT Establish up, down and rotating weights. Mill on obstruction in
window with 2K weight on the miil, 1 K-2K torque and slow
RPM. Having difficulty keeping the mill on the Whipstock slide.
22:45 - 23:30 0.75 STWHIP N DPRB WEXIT Circulate around 11.0 ppg Super Sweep pill.
23:30 - 00:00 0.50 STW HIP N DPRB W EXIT Monitor weli. Pump dry job, blow down top drive
6/2/2007 00:00 - 02:00 2.00 STWHIP N DPRB WEXIT POH f/ 3,560' md to 603' md.
02:00 - 02:30 0.50 STWHIP N DPRB WEXIT Rack collars and HWDP in derrick. UD Miliing BHA.
02:30 - 02:45 0.25 STWHIP N DPRB WEXIT PJSM- w/ WSL, NAD TP, SLB & rig crew.
Discuss R/U & running of CCL & EZSV Bridge plug.
02:45 - 03:30 0.75 STWHIP N DPRB WEXIT R/U E-liners.
03:30 - 04:00 0.50 STWHIP N DPRB WEXIT RIH for CCL and depth control run.
04:00 - 06:30 2.50 STWHIP N DPRB WEXIT Pull E-line out of the hole & R/D due to bad spot in line (wire
frayed).
Cut +250 feet off drum. Rehead running tool.
06:30-07:00 0.50 STWHIP N DPRB WEXIT R/U E-line.
07:00 - 07:30 0.50 STW HIP N DPRB W EXIT Run correlation log-CCL to 3,550' md.
07:30 - 10:00 2.50 STWHIP N DPRB WEXIT R/D logging equipment. R/U to run EZSV Bridge piug.
10:00 - 11:30 1.50 STWHIP N DPRB WEXIT RIH w/ EZSV Bridge plug. Set plug ~ 3,339' md / 3,327' tvd.
POH w/ Wireline.
11:30 - 12:15 0.75 STWHIP N DPRB WEXIT R/D E-liners
Printed: 6/28/2007 12620 PM
~
Legal Well Name: 12-12
Common Well Name: 12-12
Event Name: REENTER+COMPLETE
Contractor Name: NABORS ALASKA DRILLING I
Rig Name: NABORS 7ES
~
Spud Date: 7/2/1981
Start: 5/26/2007 End: 6/20/2007
Rig Release: 6/20/2007
Rig Number:
6/2/2007 12:15-13:15 1.00 STWHIP N DPRB WEXIT
13:15 - 14:30 1.25 STWHIP N DPRB WEXIT
14:30 - 17:30 3.00 STWHIP N DPRB WEXIT
17:30 - 19:15 1.75 STWHIP N DPRB WEXIT
19:15 - 20:00 0.75 STWHIP N DPRB WEXIT
~~ ~
~c~+"~ ~
6/3/2007
20:00-21:00 ~_ 1.OO~STWHIP~N ~DPRB ~WEXIT
21:00 - 00:00 3.OOrSTWHIP~ N DPRB WEXIT
00:00 - 08:30 I 8.5~ I STWHIPI N I OPRB I W EXIT
08:30 - 09:00 0.50 STWHIP P WEXIT
09:00 - 09:30 0.50 STWHIP P WEXIT
0930 - 09:45 025 STWHIP P WEXIT
09:45 - 10:30 0.75 STWHIP P WEXIT
10:30 - 11:30 1.00 STWHIP P WEXIT
11:30 - 13:45 2.25 STWHIP P WEXIT
13:45 - 14:45 1.00 STWHIP P WEXIT
14:45 - 17:00 2.25 STWHIP P WEXIT
17:00 - 18:30 1.50 STWHIP P WEXIT
18:30 - 19:30 1.00 STWHIP P WEXIT
19:30 - 00:00 4.50 DRILL P INT1
6/4/2007 00:00 - 12:00 12.00 DRILL P INT1
12:00 - 15:00 3.00 DRILL P INT1
15:00 - 15:30 0.50 DRILL N STUC INT1
R/U & test EZSV Bridge plug to 3500 psi / 5 minutes - PASS.
P/U & stand back (9 jts)- 6 1/4" DC's
PJSM -M/U Whipstock Assy & BHA.
RIH, Surface test MWD @ 1,031' md. RIH to 3,302' md.
Establish circulation & string wts. Orient Whipstock 21 degrees
left of Top. Tag EZSV Bridge plug ~ 3,339' md. Set
Whipstock.
Mill Lug off of Whipstock.
Mill window f/ 3,318' md (window plan 3,318' md to 3,320' md).
GPM= 504, PSI= 839, RPM= 88, Tq= 5K, Up wt= 115K, SOW=
115K, WOB= 6K.
Metal cuttings returned= 18 Ibs.
Continue to Mill new window in 9 5/8" casing from 3,318' md to
3,335' md. TOW= 3,318' md. BOW= 3,335' md. Metal
recoverd= 371 Ibs.
Drili 25 ft of new formation to 3,360' md for LOT.
Pump sweeps. Work Mill through window with and without rig
pumps on.
No Drag or weight stacking noted. Pu~l up into casing for LOT.
R/U for LOT.
Perform LOT to 13.01 ppg EMWT.
R/D, pump dry job. Blow down tines.
POH f/ 3,310' md to 375' md. Mud weight= 9.6 ppg.
UD DC's, MWD and Milling Assy. Upper Mill in gauge, Starter
Mill 1/8" out of gauge.
Pull wear bushing, Jet the Stack clean, set Wear bushing.
PJSM. -M/U Rotary Steerable BHA.
RIH U 739' md. Surface test MW D. RIH U 3,295' md.
Establish ECD and drilling parameter baselines.
Work through window: 5K Dn wt ~ 3,321' md.
10K Dn wt C~ 3,328' md. Slack off past 3,328' md w/ 424 gpm /
860 psi
to 3,345' md. Ream from 3,345' md to 3,360' md.w/ 545 gpm,
1265 psi. Tq= 4K, RPM= 30, Up wt= 115K, SOW= 105K.
Drill from 3,360' md to 3,600' md. W06= 5K, GPM= 547, PSI i
on= 1324, PSI off= 1250, Tq on= 3K, Tq off= 2K, Up wt= 118K,
SOW= 105K, Rt wt= 110K, RPM= 120, ECD= 10.45 Calc,
10.44 Act. Mud weight 9.6 ppg.
Drill ahead 8 1/2" hole with Rotary Steerable System (RSS)
Power Drive from 3,600' md to 4,707' md.
GPM= 550, PSI on= 1740, PSI off= 1607, PU wt= 135K,
SOW= 120K, Tq on= 6K, Tq off= 5K, ROT wt= 120K, Calc
ECD= 10.38 ppg, Act ECD= 10.65 ppg. Mud wt= 9.6 ppg.
Drill ahead 8 1/2" hole with RSS from 4,707' md 5232'md. At
5,935' md pumped a Lo / Hi Sweep ECD from 11.01 ppg to
10.90 ppg. GPM= 546, PSI on= 1803, PSI off= 1794, PU wt=
175K, SOW= 130K, Tq on= 9K, Tq off= 8K, ROT wt= 140K,
Calc ECD= 10.41 ppg, Act ECD= 10.89. Mud wt= 9.6 ppg.
Sudden increase in torque while drilling, stall out Top Drive,
unable to pick up or rotate, full circulation. Work pipe several
times to 200K. Pipe came free. Work pipe up one full stand
no tight hole. Run stand in while rotating with no obstruction.
Work pipe one more time with out rotating and slow pump rate,
Printed: 6/28/2007 726:20 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/4/2007 15:00 - 15:30 0.50 DRILL N STUC INT1
15:30 - 00:00 8.50 DRILL P INTi
6/5/2007 00:00 - 06:00 6.00 DRILL P INT1
06:00 - 16:15 1025 DRILL P INT1
16:15 - 17:15 1.00 DRILL N RREP INT1
17:15 - 00:00 6.75 DRILL P INT1
6/6/2007 00:00 - 02:30 2.50 DRILL P INT1
02:30 - 03:30 1.00 DRILL P INT1
03:30 - 11:00 7.50 DRILL N DFAL INT1
no problem. Resume drilling. Noted coal in bottoms up
samples.
Drili ahead 8 1/2" hole with RSS from 5232' md to 6,126' md.
At 5,935' md pumped a Lo / Hi Sweep ECD dropped from
11.01 ppg to 10.90 ppg. GPM= 546, PSI on= 1803, PSI off=
i794, PU wt= 175K, SOW= 130K, Tq on= 9K, Tq off= 8K, ROT
wt= 140K, Calc ECD= 10.41 ppg, Act ECD= 10.89. Mud wt=
9.6 PP9•
Directionaliy Drill 8 1/2" hole with Rotary Steerable System
from 6,126' md to 6650'
Pumped 40 bbl high vis sweeps at 6245' and 6461' WOB
25K, gpm 550, psi on 1875, psi off 1822, tq. on 11 K, tq off 9K,
UP 190K, SO 145K, ROT 150K, RPM 150. Caiculated ECD =
10.33 ppg. Actual ECDs = 10.65 ppg.
At 6425' Sudden increase in torque while drilling, stall out Top
Drive, unable to pick up or rotate, fali circulation. Work pipe to
40K over string weight. Pipe came free. Work pipe up one
joint no tight hole. Resume drilling.
Directionally drill f/6461' to 7608' 8 1/2" hole with Rotary
Steerable System.
Pumped 40 bbl high vis sweeps at 6245' and 6461' WOB
25K, gpm 550, psi on 1875, psi otf 1822, tq. on 11 K, tq off 9K,
UP 190K, SO 145K, ROT 150K, RPM 150.
Repair mud pump #1. Leak in charge pump line. Continue
circulating with pump #2. Circulate 40 bbl. Hi-Vis sweep 126
vis, surface to surfaceand lower ECD from 11.11 ppg to 10.33
ppg. Slight increase in cuttings across shakers.
Drill directionally 8 1/2" hole from 7608' to 8180'. 20K WOB,
541 gpm, 1985 psi on, 1932 psi off, 12K tq on, 10K tq. off, UP
215K, SO 155K, ROT 162K, RPM 150. ECD calc 10.35 ppg,
ECD actual 11.13 ppg.
Added 580 bbi new 9.6 ppg LSND mud. Lower MBT from 19 to
12, ECD improved to 11.13 ppg.
ADT = 15.02 hrs/24 hrs. Progress = 2054'.
Drill directionally 8 1/2" hole from 8180' to 8333'. 20K WOB,
550 gpm, 2095 psi on, 2013 psi off, 13K tq on, 11 K tq. off, UP
220K, SO 170K, ROT 165K, RPM i50. ECD calc 10.33 ppg,
ECD actual 11.09 ppg.
From 8202' a decrease in ROP was noted. Changed drilling
parameters with no significant improvement. Minimum ROP
75' per hour. Decision made to stop drilling per agreed with
ODE and town drilling team.
Circulate 40 bbls Hi-Vis sweep surface to surface and continue
circulating 550 gpm until ECD 10.33 ppg.
POH for bit and BHA. 35K over puli. Backreaming f/8334' to
6411'. 550 gpm, 120 rpm. Pull f/6411' to window at 3335' w/no
overpull, no backreaming. No drag coming through window.
Continue pulling to BHA at 230'.
Printed: 6/28l2007 126:20 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING i Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/6/2007 11:00 - 12:30 1.50 DRILL N DFAL INTi
12:30 - 15:00 2.50 DRILL N DFAL INT1
15:00 - 16:15 I 1.25I DRILL ~ N I DFAL I INT1
16:15 - 17:45 1.50 DRILL P INT1
17:45 - 22:00 4.25 DRILL N DFAL INTi
22:00 - 23:00 1.00 DRILL N DFAL INT1
23:00 - 00:00 1.00 DRILL P INTi
6/7/2007 I 00:00 - 06:00 I 6.00 I DRILL I P
06:00 - 12:00 I 6.00 I DRILL I P
12:00 - 12:30 I 0.501 DRILL I P
12:30 - 14:30 I 2.001 DRILL I P
14:30 - 15:30 I 1.001 DRILL I P
15:30 - 20:30 I 5.001 DRILL I P
Send 290 bbls of old 9.6 ppg mud to plant to be weighted up to
I NT1
INT1
INT1
INT1
LD 8-1/2" BHA # 7, rotary steerabie system.
PU 8-1/2" BHA # 8, rotary steerable system w/used 8.5"
RSX519 PDC bit. Surface test power drive and MW D
RIH to 3200'.
Cut and slip 95' of drilling line. Service top drive.
RIH to 8239'. Saw no drag through window f/3318' to 3335'.
Test MWD at 3578' and 4050'. OK.
Wash down last stand f/8239' to 8333'. Log overlap per geo
300 fph, 511 gpm, 1900 psi. No fili found on bottom.
Drlg 8-1 /2" hole w/rotary steerable system f/8333' to 8488'. 20K
WOB, 550 gpm, 2139 psi on, 2113 psi off, 14K tq on, 13K tq
off, 220K PU, 155K SO, 168 ROT, 150 rpm, Calc ECD 10.36
ppg, Actual ECD 10.8 ppg.
ADT f/24 hrs = 2.6 hrs. Progress = 308'.
Drlg 8-1/2" hole w/rotary steerable system f/8488' to 9100'. 20K
WOB, 550 gpm, 2200 psi on, 2120 psi off, 16K tq on, 14K tq
off, 235K PU, 162K SO, 175 ROT, 150 rpm, Calc ECD 10.36
ppg, Actual ECD 10.81 ppg.
Note: At 8676', 01:30, ECD 10.36 calc. vs. 11.33 actual. Pump
40 bbls Hi-Vis sweep, 126 Vis, surface to surface. Small
increase in cuttings noted. Drop ROP f/240 fph to 130 fph. Drill
ahead w/reduced ROP to control ECD level.
NOTE: At 04:00 hrs, 8960' the rate of penetration was
intentionally reduced to avoid driliing into the HRZ before
weighting the mud up to 11.5 ppg. The "spike" fluid from the
MI mud plant was not ready due to some inconsistency in the
performance of the polymer products that affected the yield
point of the mud.
Drlg 8-1/2" hole w/rotary steerable system f/9100' to 9464'.
Add 13.4 ppg LSND spike fluid and bring mud wt f/9.6 ppg to
11.5 ppg. Control drill until mud wt at 11.5 ppg prior to 9200'.
10 to 20K WOB, 500 gpm, 2414 psi on, 2306 psi off, 16K tq on,
13K tq off, 245K PU, 165K SO, 180 ROT, 150 rpm, Calc ECD
12.20 ppg, Actual ECD 12.49 ppg.
Drig w/8-1l2" rotary steerable system f/9464' to 9506'. Incur
200 bbl/hr mud losses. 15K WOB, 553 gpm, 2306 psi on, 16K
tq on, 150 rpm.
Monitor well and note flowback returning 1/3 of lost fluid. Flow
then tapered off and stopped.
Circulate and reciprocate. 250 gpm, 714 psi, 30' strokes.
Pump 15 Ib/bbi LCM, MI Mix II fine and medium.
INT1 Drlg f/9506' to 9559' w/mud losses 140 to 200 bbls/hr. 15
WOB, 505 agpm, 2146 psi on 15K tq on, 100 rpm.
INTi Circulate and reciprocate 267 gpm, 734 psi. w/no losses.
Printed: 6/28/2007 1:26:20 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/7/2007 15:30 - 20:30 5.00 DRILL P INT1 11.5 ppg. Ordered additional 290 bbls new mud f/MI to start
building.
20:30 - 23:30 3.00 DRILL P INT1 Pump 50 bbl LCM pill w/15 Ib/bbl of Mix II Fine and Medium,
continue drilling ahead using Mix II Fine and Medium LCM.
Drill f/9559' to 9748'. WOB 15K, 206 gpm, 2317 psi on, 2212
psi off, tq on 17K, tq off 16K, PU 240K, SO 155K, ROT 180K.
Calculated ECD 12.35 ppg, Actual ECD = 12.69 ppg.
At 9730' noted 100 bbl loss in 12 minutes.
23:30 - 00:00 0.50 DRILL P INT1 Shut down pumps and reciprocated pipe. Well breathing.
Gained back 130 bbis then flow gradually stopped.
6/8/2007 00:00 - 01:30 1.50 DRILL P INT1 Drlg f/9748' to 9830'. Pump 50 bbl LCM pill w/151b/bbl of Mix II
Fine and Medium, continue drilling ahead using Mix II Fine and
Medium LCM. WOB 15K, 206 gpm, 2317 psi on, 2212 psi off,
tq on 17K, tq off 16K, PU 240K, SO 155K, ROT 180K.
01:30 - 04:30 3.00 DRILL P INTi Shut down pumps. Reciprocate pipe. Well breathing. 100
bbls recovered and flow gradually stopped.
Mobilize 290 bbls 11.5 ppg mud from MI piant. Offload mud
f/truck to pits.
04:30 - 05:00 0.50 DRILL P INT1 Pump 50 bbl LCM pill w/15 Ib/bbl of Mix II Fine and Medium,
continue drilling ahead stringing in Mix II Fine and Medium
LCM. 528 gpm, 2183 psi, 150 rpm, 15K WOB. Losing mud at
200 bbls/hr. Control drill 100 ftJhr.
05:00 - 06:00 1.00 DRILL P INT1 Increase ROP to 170 fph at 9885' and drill to 9907'. 528 gpm,
2183 psi, 150 rpm, 15K WOB. Losing mud at 200 bbls/hr.
Shut down and monitor well. Lost 175 bbls and flowed back
120 bbls and then flow tapered off.
06:00 - 15:00 9.00 DRILL P INTi Driil directionally f/9907' to 10401'. 495 gpm, 2220 psi on,
2200 psi off, 18K tq on, 18K tq off, PU 265K, SO 160K, ROT
180K, 150 rpm. 12.3 ppg Calc ECD, 12.53 ppg Actual ECD.
15:00 - 16:30 1.50 DRILL P INT1 Circulate bottoms up for samples per geos. 500 gpm, 2200
psi.
16:30 - 16:45 0.25 DRILL P INTi Drill directionally f/10401' to 10415' and TD intermediate
section per geos. 495 gpm, 2222 psi on, 2103 psi off, 18K tq
on, 17K tq off, PU 260K, SO 160K, ROT 180K, 150 rpm.
16:45 - 18:00 1.25 DRILL P INTi Circulate bottoms up. 361 gpm, 1340 psi, 100 rpm.
18:00 - 19:30 1.50 DRILL P INT1 Monitor well. 150 bbls flowed back. Rate decreasing steadily.
19:30 - 22:00 2.50 DRILL P INTi Wiper trip, pump out of hole without backreaming to 9327'.
Possible slight amount of swabbing, difficult to verify due to
"breathing" flowback. 200 gpm, 520 psi. MW = 11.7 ppg.
22:00 - 23:00 1.00 DRILL P INT1 Monitor well. Well ffowing back. Flowback steadily decreasing.
Allow to breathe.
23:00 - 23:30 0.50 DRILL P INT1 RIH f/9327' to 10415'.
23:30 - 00:00 0.50 DRILL P INT1 Circulate bottoms up. 400 gpm, 1350 psi, 100 rpm. Loss rate
averaged 250 bbls/hr. white pumping.
ADT f/24 hrs = 7.08 hrs. Progress f/24 hrs = 667'. Fluid lost to
well f/24 hrs = 707 bbls.
6/9/2007 00:00 - 00:30 0.50 DRILL P INT1 Continue circulating bottoms up. 400 gpm, 1350 psi, 100 rpm,
16K tq.
Printed: 6/28/2007 12620 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2h981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/9/2007 00:30 - 01:30 1.00 DRIIL P INT1
01:30 - 03:00 1.50 DRI~L P INT1
03:00 - 03:15 I 0251 DRILL I P I I INT1
03:15 - 06:00 I 2.751 DRILL I P I I INT1
06:00 - 11:30 I 5.501 DRILL I P I I INT7
11:30 - 13:00 1.50 DRILL P INT1
13:00 - 17:30 4.50 DRILL P INT1
17:30 - 21:00 I 3.50 ~ DRILL I P I I ~NTi
21:00 - 21:30 0.50 DRILL P INTi
21:30 - 23:30 2.00 DRILL P INT1
23:30 - 00:00 ~ 0.50I DRILL I P I I INTi
6/10/2007 100:00 - 02:00 I 2.001 DRILL I P I I INT1
02:00 - 02:15 0.25 DRILL P INTi
02:15 - 04:30 2.25 DRILL P INT1
04:30 - 05:30 1.00 DRILL P INT1
05:30 - 06:00 0.50 DRILL P INT1
06:00 - 07:00 1.00 DRILL P INT1
07:00 - 07:30 0.50 DRILL P INT1
07:30 - 09:00 1.50 DRILL P INT1
09:00 - 09:30 0.50 DRILL P INT1
09:30 - 11:00 1.50 CASE P INT1
11:00 - 12:30 I 1.501 CASE I P I I LNR1
12:30 - 18:00 5.50 CASE P LNR1
18:00 - 19:30 1.50 CASE P LNR1
19:30 - 00:00 I 4.50I CASE I P I I LNR1
6/11/2007 00:00 - 01:30 1.50 CASE P LNR1
01:30 - 02:30 1.00 CASE P LNR1
Monitor well. Flowed back 180 bbls. decreasing steadily.
POH. Well swabbing and flowing back "breathing". Pump out
of hole f/10415' to 9050' 172 gpm, 400 psi. Fluid levels in pits
static during pump out. MW = 11.5 ppg.
Monitor well. Flowed back 8 bbls. in 15 minutes. Flow
decreasing.
POH. Pump out of hole f/9050'. 175 gpm, 400 psi. MW =
11.5 ppg. Flowcheck at 8475'. Well static.
Attempt to POH w/pumps off. Well swabbing. Pump out of
hole through window at 3335' (w/no problem pulling through
window) to 3290' with overpulls at 8850', 8735', 7514', 7425',
7405', 7305', 7240'. Backream at 7290'.
Monitor well. Flowing back w/flow slowly decreasing.
RIH f/3290' to 10415'. Took 8K drag at 3378' and 3460'. Took
50K down weight at 4567'. 35K down weight at 8923 thru 8948'
and 9188' thru 9240'. Took 25K down weight at 9277'. Took
15K down weight at 9950'. Found no fill on bottom.
Circulate and reciprocate f/10415' to 10189'. Rack back one
stand each hour and continue CBU x 3. 504 gpm, 2077 psi,
150 rpm, 17K tq, 280K PU, 140K SO, 180K ROT.
Circulate/blend 290 bbls fresh 11.5 ppg LSND mud to well.
See large amounts of LCM and some splintered shale. Shut
down pumps. Fluid loss average f/CBU x 3= 60 bbls/hr.
RIH to 10415'. Found no fil-.
Record SPRs and pump out of hole f/10415' to 9337'. 150
gpm, 360 psi, 235K PU, 150K SO.
Monitor well for breathing and see 8bb1 gain in 1/2 hr. w/flow
decreasing.
Attempt to POH w/pumps off. 260K PU, 177K SO. Well
swabbing. Pump out of hole f/9337' to 7685'. 150 gpm, 250
psi. No tight spots. MW = 11.5 ppg.
Pull 4 stands f/7685' to 7265' w/pumps off. Well swabbing.
Pump out of hole f/7265' to 4820'. 150 gpm, 250 psi. No tight
spots.
POH w/pumps off f/4820' to 3296' above window at 3335'.
Monitor well and pump dry job.
POH to BHA at 833'. Monitor well.
LD 5" heavyweight drill pipe.
LD 8-1/2" Rotary Steerable BHA #8 and clear floor.
Pull and inspect wear bushing.
RU and install 7" rams. Test ram doors to 250 psi low pressure
and 3500 psi high pressure. Pull test plug.
Install wear bushing. RU to RIH w/7" 26# ~-80 BTC-M/TC-II
liner.
RIH w/7" liner to 3277' at 40'/min per running schedule.
Circulate liner volume x 1.5, 114 gpm, 176 psi. at window
before running into OH. Partial losses.
RIH w/7" 26 # liner f/3277' to 6563' at 40 ft/min to minimize
mud losses. Total mud lost to well bore running liner to 6563' _
98 bbls.
RIH w/7" Iliner f/6563' to 7185'. PU 205K, SO 130K.
PU and RIH w/7' liner top packer/liner hanger and C-2 liner
running tool. Attempt to pump bottoms up x 1.5 per plan
Printed: 6/28/2007 1:2620 PM
~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING i Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/11/2007 01:30 - 02:30 1.00 CASE P LNR1 forward. Pump 90 bbls 11.5 ppg mud at 150 gpm, 425 psi. 6
bbls returned. Consult w/ODE/town team. Decision made to
~, continue running in hole at 2.5 mins/40 ft. per schedule.
i 02:30 - 07:00 4.50 CASE P LNR1 RIH f/6563' to 10415'. Filling every 10 stands. Fluid losses
averaging 20 bbls/hr. Washed down last stand to TD at 10415'.
PU 1' to 10414'. PU 285K, SO 125K.
07:00 - 07:30 0.50 CEMT P LNR1 RU cement head and lines. PJSM w/WSL, tourpusher,
Schlumberger, all hands.
07:30 - 09:00 1.50 CEMT P LNR1 Circulate 11.5 ppg LSND mud, 90 gpm, 630 psi. 2% returns.
PU 310K. Unable to move pipe f/10414'.
09:00 - 13:00 4.00 CEMT P LNR1 Pump 5 bbls of H20 w/Schlumberger through lines to floor and
out Tee to washup hose. Test lines to 4K psi. Walk lines. OK.
Pump 11.6 ppg Mudpush/Cemnet to floor w/washup tee open.
No H20 downhole. Close washup tee valve and pump 22 bbls
Mudpush/1 Ib/bbl Cemnet spacer down driilpipe. Mix and
pump 219 bbis. of 11.8 ppg CemCrete Lite lead cement
w/additives and 1 Ib/bbi Cemnet. Mix and pump 23 bbls of
15.8 ppg tail slurry w/additives and 2 Ibs/bbl Cemnet. Shut
down and drop drill pipe wiper dart. Pump 5 bbls of
displacement H20 w/Schlumberger to clear cement f/lines.
Switch to rig pumps and continue displacement of cement
w/319 bbis (5615 stks.) 11.5 ppg LSND mud. Average
displacement rate = 3 bpm. See wiper dart pickup liner wiper
plug w/pressure increase f/500 psi to 1500 psi and back to 500
psi. Continue displacement. Slow displacement rate to 1.5
bbl/min. FCP = 875 psi. Bump plug, CIP at 13:00 hrs. Poor
mud returns. 2% average w/occasional increase to 11 %
dropping back to 2%.
13:00 - 13:45 0.75 CEMT P LNRi Pressure up to 2900 psi to shear and set Flex-Lok liner
hanger. SO 40K to check hanger set. OK. Pressure up to
4100 psi to actuate ZXP packer setting tooi. Bleed pressure to
0 and check floats. OK, no fiow back. Pressure drill pipe to
1000 and pick up siowly 8' untii pressure bled to zero indicating
packoff bushing clear of tie back sleeve and rotating dog sub
clear of extension sleeve. Circulate 50 bbis mud to bring
cement above liner top. Slack off 45K on rotating dog sub.
Saw good indication at floor that ZXP packer set. PU clear of
liner top and circulate 240 bbls, 339 gpm, 696 psi. No
indication of cement returns coming above liner top seen at
surface. 575 bbls mud lost to formation during cementing.
Saw ph spike in fluid back to surface found some Cemnet
fibers in mud.
13:45 - 14:30 0.75 CEMT P LNR1 RD cement head and clear floor.
14:30 - 15:15 0.75 CEMT P LNR1 Dispiace mud w/seawater f/3167' to surface. 283 gpm, 110
psi.
15:15 - 19:00 3.75 CEMT P LNR1 Monitor well. MW = 8.5 ppg. POH laying down 5" drili pipe 1 x
1.
19:00 - 19:15 0.25 CEMT P LNRi LD liner running tools. Brass screws sheared on rotating dog
sub.
19:15 - 21:30 2.25 BOPSU P LNR1 Pull and inspect wear bushing. Set test plug. Change top rams
Printed; 6/28/2007 126:20 PM
~ ~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
12-12
12-12
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Spud Date: 7/2/1981
Start: 5/26/2007 End: 6/20/2007
Rig Release: 6/20/2007
Rig Number:
6/11/2007 I 19:15 - 21:30
21:30 - 22:30 1.00 BOPSU~ P
22:30 - 00:00 1.50 BOPSU P
6/12/2007 00:00 - 03:30
03:30 - 04:30
04:30 - 11:30
11:30 - 12:00
12:00 - 13:00
13:00 - 18:00
18:00 - 19:00
19:00 - 20:30
20:30 - 22:30
22:30 - 23:00
23:00 - 00:00
6/13/2007 00:00 - 00:30
LNR1 to 3.5" x 6" variable rams. CO top drive IBOP and saver sub to
4" HT-40.
LNR1 RU for BOP test.
LNR1 BOP test. High pressure 3500 psi, low pressure 250 psi.
AOGCC rep Jeft Jones waived AOGCC presence at test.
W itnessed by Lenward Toussant, Nabors tourpusher and
Lowell Anderson, BP WSL.
LNR1 Continue w/BOP test 3500 psi high pressure, 250 psi low
pressure.
LNRi Test 7" liner x 9-5/8" casing to 3500 psi f/landing collar/plugs at
top of shoe track at 10288' to surface. Record for 30 minutes
on chart.
LNR1 RIH w/5" drill pipe from derrick to 3100'. POH and LD same 1
x 1. Repeat. LD 213 jts of 5" drill pipe.
LNR1 Pull and inspect wear ring.
TIE61 RU casing running and torque/turn recording equipment.
TIE61 RUN 7" 26 # L-80 TC-II w/tieback stem to top of liner tieback
sleeve at 3213'.
TIEB1 CO short to long bails to handle cement head. Check and load
upper and lower plugs into cement head. RU cement head.
2251 BOPSUFi P
3.50 BOPSU P
1.00 BOPSU P
7.00 CASE P
0.50 CASE P
1.00 CASE P
5.00 CASE P
1.00 CEMT P
1.50 CEMT P TIEB1 Sting into tieback sleeve at 3213' and land on NO GO on
tieback stem. Mark casing. Pressure to 500 psi and hold 3
min. Seals in place and holding. Bleed pressure to 0. PU 8'
per Baker rep to expose four 1" ports in tieback stem for
cementing. Pump 3 bbls around and check for full circulation.
2.00 CEMT P TIE61 PJSM w/Schlumberger, Hot Oii, tourpusher, WSL, mudmen, ali
hands. Take all returns down fiow line and across drag chain
until switch to rig pumps for displacement. Pump 5 bbls H20
w/Schlumberger and pressure test all lines w/Schlumberger
and Hot Oil to 4000 psi. Pump 10 bbls Mudpush spacer w/red
dye w/Schlumberger at 2.5 bbl/min. Switch valves to Hot Oil
Service and pump 75 bbls of 80 deg. diesel, 5 bbls/min. Shut
down. Switch valves to Schlumberger. Drop bottom plug.
Pump 12.8 bbls 15.8 ppg class "G" tail slurry plus additives.
Drop top plug. Pump 5 bbls of H20 displacement
w/Schlumberger. Shut down pumps. Switch to rig pumps.
Ciose Annular BOP, open annulus valve and take returns via 2"
hose direct to cuttings box to avoid diesel in pits. Pump
additional 118 bbls of clean seawater displacement w/rig
pumps at 6 bbls/min slowing to 3 bbls/min last 5 bbls. Bump
plug on schedule and pressure to 600 psi. Shut down pumps.
Slack off and bleed back pressure to sting tie back stem in to
No Go and casing landing mark. CIP at 22:14 hrs. Saw 10
bbls of Mudpush w/red dye and 3 bbls diesel retumed to
surface. Check 7" casing and 7" x 9-5/8" annulus for flowback.
None.
0.50 CEMT P TIE61 RD casing running equipment, blow down lines, lay down
cement head. Check cement head. Both plugs gone.
1.00 BOPSU P TIEB1 Drain BOP stack. ND BOP stack.
0.50 BOPSU P TIEB1 ND BOP stack and PU and install slips on 7" casing. Per
Printed: 6/28/2007 126:20 PM
, ~ ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/13/2007 00:00 - 00:30 0.50 BOPSU P TIEB1
00:30 - 01:00 0.50 BOPSU P TIEB1
01:00 - 02:00 1.00 BOPSU P TIEB1
03:30 - 04:00 0.50 BOPSU P TIEB1
04:00 - 06:00 2.00 BOPSU P TIEB1
06:00 - 07:00 1.00 BOPSU P TIEB1
07:00 - 08:00 1.00 BOPSU P TIE61
08:00 - 11:00 3.00 DRILL P PROD1
11:00 - 11:30 0.50 DRILL P PROD1
11:30 - 12:00 0.50 DRILL P PROD1
12:00 - 14:45 2.75 DRILL P PROD1
14:45 - 15:15 I 0.501 DRILL I P I I PROD1
15:15 - 16:30 1.25 DRILL P PRODi
16:30 - 18:45 2.25 DRILL P PROD1
18:45 - 20:45 2.00 DRILL P PROD1
20:45 - 22:00 125 DRILL P PROD1
22:00 - 00:00 2.00 DRILL P PROD1
6/14l2007 00:00 - 00:30 0.50 DRILL P PROD1
00:30 - 01:30 1.00 DRILL P PROD1
01:30 - 02:30 1.00 DRILL P PROD1
02:30 - 03:30 1.00 DRILL P PROD1
03:30 - 04:30 1.00 DRILL P PROD1
Cameron representative, SO 67K on slips. Stand back BOP.
Install packoff. Install new 13-5/8" x 13-5/8" tubing spool.
RU and make casing cut w/Wachs cutter.
Cameron spacer rings f/packoff previously milied out still too
tight. Would not fit on casing. Send to Baker and re-mill to
proper specifications.
Test packoff f/30 min. to 4300 psi. via externtal test port.
NU BOP stack to flange. Have welder modify bell nipple.
Body test on BOP and tubing spool upper flange. Recorder
bad. Change out recorder and retest. Install wear bushing.
MU BHA #9 w/Hughes ATJ-4 bit, near bit stab, NM flex drill
collar, NM stab, NM flex drili collar x 2, hydraulic jars, XO to 4"
HT40 drill pipe. BHA = 135'.
PU 4" HT-40 drill pipe 1 x 1. RIH f/135' to 3139'. Tag up on
cement stringers above piugs.
RU and test above tieback landing collar to surface at 3300 psi.
Hold 5 min. RD test equipment.
Drill stringers down to plugs at 3196'. 230 gpm, 340 psi, 75
rpm, 2K tq, PU 75K, SO 73K, ROT 75K.
Drill plugs down to 3198' and drill tieback landing collar/float
collar f/3198' to 3201'. 357 gpm, 747 psi, 100 rpm, 20K WOB,
3K tq, 75K PU, 75K SO, 75K ROT.
REAM/BACKREAM through tieback float equipment area
f/3190' to 3228'. 357 gpm, 747 psi, 100 rpm, 75K PU, 75K
SO, 75K ROT.
PU and RIH 4" drili pipe f/3228' to 4535'.
D-1 drill. 2 min. CRT. Stripping drill w/WSL, toolpusher, crew.
BD choke, kill lines, choke manifold.
PU 4" HT-40 driil pipe and RIH f/4535' to 7299'.
Fill drill pipe w/seawater. Hole out of balance. Circulate 11.5
ppg mud OOH. 213 gpm, 430 psi.
PU and RIH w/4" drili pipe f/7299' to 10173'.
RIH f/10173' to 10290' Tag stringers. Fill drill pipe.
RU and test 7" intermediate casing f/10290' to surface. 3500
psi. w/chart f/30 minutes.
Drill cement stringers and tag plug above insert landing coliar
at 10325'.
Drili shoetrack f/10325' to 10405'.
Circulate and swap seawater over to 8.4 ppg Flo-Pro mud
system. 350 gpm, 1675 psi.
04:30 - 05:00 0.50 DRILL P PROD1
05:00 - 06:00 1.00 DRILL P PROD1
06:00 - 10:00 4.00 DRILL P PROD1
10:00 - 10:30 0.50 DRILL P PROD1
10:30 - 11:30 1.00 BOPSU P PROD1
11:30 - 12:30 1.00 DRILL P PROD1
12:30 - 13:00 I 0.50 ~ BOPSUp P ~ I PROD1
Drill out f/10405' thru shoe at 10414' to 10418'.
CBU 345 gpm 1390 psi. Overboard cement contaminated mud
to cuttings box.
POH. MW = 8.4 PP9•
LD cleanout BHA #9.
Function test BOP. Install wear bushing. Jet stack.
PJSM. PU BHA # 10 w/Hughes 6-1/8" MX 18-HDX ser #
5114743, Short Pac 2.29 deg. motor .7 gpm/rev, bypass sub
(w/float), NM flex lead drill collar, Impuise MWD, NM XOs, NM
Flex drill collars x 3, hydraulic jars, ball catcher, CCV, XO to 4"
HT-40 drill pipe. BHA OAL = 206.80'.
Pull, check, and reinstali wear bushing.
Printed: 6/28/2007 126:20 PM
. ~
Legal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/14/2007 13:00 - 14:30 1.50 DRILL P
14:30 - 17:30 3.00 DRILL P
17:30 - 21:30 4.00 DRILL P
21:30 - 22:00 0.50 DRILL P
22:00 - 23:15 125 DRILL P
23:15 - 00:00 0.75 DRILL P
6/15/2007 100:00 - 09:00 I 9.001 ORILL I P
09:00 - 10:00 1.00 DRILL P
10:00 - 11:00 1.00 DRILL P
11:00 - 15:00 I 4.001 DRILL I P
15:00 - 16:00 I 1.001 DRILL I P
16:00 - 17:30 1.50 BOPSU P
17:30 - 19:30 2.00 DRILL P
19:30 - 00:00 4.50 DRILL P
6/16/2007 00:00 - 01:00 1.00 DRILL P
01:00 - 02:00 1.00 DRILL P
02:00 - 02:30 0.50 DRILL P
02:30 - 00:00 21.50 DRILL P
6/17/2007 100:00 - 06:00 I 6.001 DRILL I P
06:00 - 17:00 I 11.001 DRILL I P
PROD1 Continue to PU BHA # 10.
PRODi PJSM w/Schlumberger and crew. PU and RIH w/4" HT-40 drill
pipe 1 x 1 f/266' to 2884'. Surface test MW D at 876'.
PROD1 RIH w/stands f/derrick f/2884' to 10414'.
PROD1 Slide and drill directionally f/10418' to 10435'. 255 gpm, 1621
psi on, 1507 psi off, 180K PU, 140K SO.
PROD7 CBU 271 gpm, 1632 psi, 230 bbls.
PROD1 PU into casing at 10400'. Perform and chart FIT w/new 6-1/8"
open hole drilled f/10415' to 10435', 8718' TVD, 8.4 ppg mud,
9.5 EMW w/499 psi at surface.
PROD1 Slide and drill directionaily f/10435' to 10661' w/2.29 Short Pac
motor BHA #10. 280 gpm, 1840 psi on, 1660 psi off, 180K PU,
138K SO, WOB 15K-25K.
PROD1 Pump out of hole to 10337' MW = 8.4 ppg. Drop bali for CCV,
pump down at 85 gpm, 648 psi, shear CCV at 2150 psi.
PROD1 Circulate 375 bbls/1.5 BU, 500 gpm, 1850 psi. Monitor weil.
Pump dry job.
PROD1 POH f/10337' to 302'. Drop 1.76" bail to CCV. Close CCV
w/1800 psi. Pump and confirm closing of CCV. Circulate 100
gpm, 200 psi.
PROD1 LD 2.29 deg motor driliing BHA #10. Stand back flex collars in
derrick. Clear and clean floor.
PROD1 Pull 9-3/16" wear ring. Install 6-1/4" wear ring. Up load MWD.
PROD1 PJSM on nuke safery w/Schiumberger, crew, WSL, tourpusher.
RIH w/ BHA #11 w/Hycalog bit 6-1/8" DSX-613M-B4 s/n
113684, XP AIM Motor 1.50 deg bend, bypass sub wJfloat, NM
stabilizer, NM Flex lead drill coilar, Impulse MWD, ADN4, 3 NM
Fiex drill collars, hydraulic jars, ball catcher, CCV, XO to 4.00
HT-40 drill pipe.
BHA OAL = 240.60'.
PROD1 RIH f/ 241' and attempt shallow test MWD at 719'.
Unsuccessful. RIH and shallow test MWD at 1197'. 270 gpm,
860 psi. RIH fiiling drill pipe every 2500' to 10414'.
PROD1 PJSM. Cut and slip drilling line. Service top drive.
PROD1 RIH f/10414' to 10661'. Per geos, log uphole w/ADN positioned
at 10576' to ADN depth of 10398', bit depth 10499', 250 gpm,
1510 psi, 178'/hr.
PROD1 RIH f/bit depth of 10499' to 10661'.
PROD1 Slide/drill directionally in Sag River sand f/10661' to 11429'.
10661' Sliding = 280 gpm, 1940 psi on, 1780 psi off, 180K PU,
140K SO, WOB 12K-25K. MW = 8.4 ppg.
11429' Rotating = 282 gpm, 1985 psi on, 1820 psi off, 180K
PU, 133 SO, ROT 145K, rpm 60, tq on 6.5K, tq off 5K. WOB
5K-15K. MW = 8.5 ppg.
ADT f/24 hrs = 15.17 hrs. AST = 13.45 f/24 hrs. ART = 1.72
f/24 hrs. Progress f/24 hrs = 768'.
PROD1 Slide/driil directionally In Sag River sand f/11429' to 11850'.
280 gpm, 2250 psi on, 2080 psi off, 184K PU, 143K SO, TQ
on 8K, TQ off 6.5K, WOB 12K-25K. MW = 8.5 ppg.
PROD1 Slide/drill directionally in Sag River sand f/11850' to 12650'.
290 gpm, 2235 psi on, 1980 psi off, 190K PU, 135K SO, 145K
Printed: 6/28/2007 126:20 PM
i i
ILegal Well Name: 12-12
Common Well Name: 12-12 Spud Date: 7/2/1981
Event Name: REENTER+COMPLETE Start: 5/26/2007 End: 6/20/2007
Contractor Name: NABORS ALASKA DRILLING i Rig Release: 6/20/2007
Rig Name: NABORS 7ES Rig Number:
6/17/2007 06:00 - 17:00 11.00 DRILL P PROD1 ROT, TQ on 9K, TQ off 5K, WOB 12K. MW = 8.5 ppg.
17:00 - 21:30 4.50 EVAL P OTHCMP MADPass bit depths: f/12650' to 10900', 300 gpm, 2050 psi,
600'-720'/hr, 100 rpm, 5K tq.
21:30 - 22:30 1.00 DRILL P PROD1 Pump out of hole f/10900' to shoe at 10415'. Drop 1.76" CCV
ball and pump down at 85 gpm, 560 psi, to seat while pulling
last stand to position bit above shoe.
22:30 - 00:00 1.50 DRILL P PROD1 Pressure up on ball and CCV opened at 1900 psi, 38 bbls.
Stage pumps up to 400 gpm, 1420 psi and CBU x 2, 100 gpm,
475 psi. 25% increase in cuttings noted across shakers.
Monitor well f/15 minutes. MW = 8.6 ppg in and out.
6/18/2007 00:00 - 04:00 4.00 DRILL P PROD1 POH to BHA #11. Drop closing bail and cycle CCV.
04:00 - 06:00 2.00 DRILL P PROD1 PJSM w/Schlumberger, WSL, tourpusher, all hands on nuke
safety. LD final drilling BHA #11.
06:00 - 07:00 1.00 CASE P RUNPRD PJSM. w/WSL, toolpusher, all hands. RU to run 4.5" 12.6"#
IBT slotted/solid liner.
07:00 - 10:30 3.50 CASE P RUNPRD RIH w/f4.5" IBT float shoe/slotted liner/ Swell Packe/solid liner
to 2375'.
10:30 - 11:00 0.50 CASE P RUNPRD MU 5" x 7" HMC/ZXP liner hanger/liner top packer to liner and
verify abiliry to circulate by pumping through tools 3bpm, 160
psi. PU 53K, SO 53K.
11:00 - 15:30 4.50 CASE P RUNPRD Run liner in hole w/4" HT-40 drill pipe f/2375' to 10414'. No
difficulty getting liner down.
15:30 - 17:30 2.00 CASE P RUNPRD Break circulation. 2 bpm, 425 psi, 3 bpm, 525 psi, 4 bpm 650
psi, pump 81 bbls. around 1 st slotted liner jt back up annulus.
PU 165 K, SO 137K, ROT 155K.
17:30 - 18:00 0.50 CASE P RUNPRD RIH and tag bottom at 12652'. PU to setting depth of 12648'.
Drop 1.75" ball, MU top drive and stage pumps up, 1 bpm at
175 psi, 2 bpm at 510 psi, 3 bpm at 610 psi, 4 bpm, 780 psi.
See ball hit seat and pressure up to 1900 psi, SO liner wt +
20K on hanger. Continue to pressure up to 3900 psi to actuate
pusher tool. PU 8' to clear rotating dog sub f/ZXP packer
extension sleeve. Left stinger in RS stuffing box/RS nipple for
1500 psi annulus pressure test.
18:00 - 20:30 2.50 CASE P RUNPRD Make two attempts to test annulus stung into RS nipple/RS
stuffing box. Pressure up to 1500 psi and pressure bled back
to 500 psi. SO 35K on packer and feel dog sub shear. PU
165K, SO 150K. SO putting 65K on packer. Check out surface
equipment. OK. Pressure up 2nd try to 1500 psi w/bleed back
to 700 psi. Check for flow back up drill pipe out stand pipe
bieeder hose and had flow back up drill pipe. Test down driil
pipe against ball/bail seat, RS stuffing box seals, HMC hanger
setting port, and pusher tool to 4000 psi. and draw line on
chart. Consult w/town team.
20:30 - 22:30 2.00 CASE P RUNPRD MW = 8.5 ppg. PU and POH and place stinger at 10123'.
Circulate 100 bbl freshwater spacer and then displace Flo-Pro
mud to 8.5 ppg seawater. 417 gpm, 1893 psi. Circulate until
clean across shakers.
22:30 - 00:00 1.50 CASE P RUNPRD Monitor well f/15 min. Static. MW = 8.5 ppg in and out. POH
laying down 4" HT 40 drill pipe 1 x 1.
6/19/2007 00:00 - 08:00 8.00 CASE P RUNPRD LD 4" HT-40 drill pipe 1 x 1.
08:00 - 09:30 1.50 RUNCO RUNCMP R/U to Torque Turn 4 1/2" Tbe completion string.
Make dummy run w/ Hanger. PJSM w/ WSL, TP, Baker rep
and rig crew.
Printed: 6/282007 1:2620 PM
~ •
Legal Well Name:
Common Well Name
Event Name:
Contractor Name:
~, Rig Name:
6/19/2007 I 09:30 - 22:30
12-12
12-12
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS7ES
13.00
22:30 - 00:00 1.50
6/20/2007 00:00 - 00:30 0.50
~i~ 00:30 - 02:00 1.50
02:00 - 03:30 1.50
Start: 5/26/2007
Rig Release: 6/20/2007
Rig Number:
RUNCMP
RUNCMP
RUNCMP
RUNCMP
RUNCMP
03:30 - 04:00 0.50 BOPSU P RUNCMP
04:00 - 05:30 1.50 BOPSU P RUNCMP
05:30 - 06:30 1.00 WHSUR P RUNCMP
06:30 - 07:30 1.00 WHSUR P RUNCMP
07:30 - 08:00 0.50 WHSUR P RUNCMP
08:00 - 08:30 0.50 W HSUR P RUNCMP
08:30 - 09:30 1.00 WHSUR P RUNCMP
09:30 - 10:30 1.00 WHSUR P RUNCMP
10:30 - 11:30 1.00 WHSUR P RUNCMP
11:30 - 15:00 3.50 WHSUR P RUNCMP
Spud Date: 7/2/1981
End: 6/20/2007
Run 4 1/2", 12.6 Ib/ft, Vam Top 13 Chrome Tbe comptetion
string.
Optimum Torque = 4,440 ft/Ibs. Min Tq = 4,000 fUlbs & Max Tq
= 4,880 ft/Ibs.
Will Utilize: Jet Lube Seal Guard thread compound for chrome
Tbg.
Baker Lok on all connections below the Baker S-3 packer (7" x
4 1 /2").
PU wt= 136K, SOW= 107K. Seawater wt= 8.5 ppg
Tag No-Go ~ 10,254' md. UD 2 jts Tbg.
M/U Space out pups. M/U Tbg Hanger and Land same.
Space out= 3.74' above No-Go.
RILDS. Back out landing joint.
Reverse circulate in 76 bbls of Inhibited Seawater followed by
115 bbls of untreated Seawater(3 bpm / 220 psi). Drop ball and
rod. Allow to drop 10 minutes.
PT Tbg to 3500 psi f/ 30 min - OK - Bieed off Tbg pressure to
1500 psi.
PT annulus to 3500 psi f/ 30 min - OK - Bleed off annulus
pressure.
Bleed off Tbg pressure. PT annulus to 2500 psi to shear DCK
valve. Pump both ways to confirm ability to freeze protect.i
Install TWC. PT from below to 1000 psi f/ 5 min - OK.
N/D BOPE.
N/U Adaptor flange and Tree.
Test Adaptor flange and Tree to 5000 psi f/ 30 min. - OK.
P/U lubricator and pull TWC.
R/U to freeze protect. PT lines to 4000 psi. PJSM w/ Little Red~
Services.
Reverse in 75 bbls of diesel @ 6.8 ppg / 85 degrees F.
Allow well to U-tube. R/D U-tube equipment.
Install BPV w/ lubricator. Test to 1000 psi f/ 5 min - OK.
Install Tree cap and gauges. Clean and secure well.
Remove excess fluids from pits and rotary table.
Release Rig from DS 12-12A ~ 15:00 hrs on 06-20-2007
Printed: 6/28/2007 12620 PM
bp
DS12-12A Su
Report Date: 17-Jun-07
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - EOA
Structure/Slot: DS-12/12•12
Well: 12-12
Borehole: 12-12A
UWI/API#: 500292061001
Survey Name / Date: 12-12A / June 17, 2007
Tort /AHD! DDI / ERD ratio: 283.476° / 6799.14 ft/ 6.446 / 0.778
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location LatlLong: N 70.21659144, W 148.41208822
Location Grid wE Y/X: N 5931326.500 ftUS, E 696842.950 ftUS
Grid Convergence Angle: +1.49423528°
Schlumberger
Report
Vertiwl Section Azimuth: 316.370°
Vertical Section Origln: N 0.000 ft, E 0.000 ft
ND Reference Datum: Rotary Table
ND Refeience Elevation: 70.84 ft relative to MSL
Sea Bed / Ground Level Elevation: 40.88 ft relative to MSL
Magnetic Declination: 23.868°
ToWI Field Strength: 57656.003 nT
Magnetic Dip: 80.887°
Declination Date: June 01, 2007
Magnetic Declination Model: BGGM 2007 ~
North Reference: True North
Total Corr Mag North •> True North: +23.868°
Local Coordinates Reterenced To: Well Head
Comments Measured ~nclination Azimuth SubSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de fl n n ft ft n n de 100 it ftUS ftUS
~"1~t U.UU U.UU U.UU -N.2f4 U.UU U.UU U.UU U.VV U.UV V.VU V.VV ~`JJ13ZU.OV O`J084L.y0 IV /V.L109:1144 VV 148.41LVOaLL
CB Gyro MS 99.84 0.00 0.00 29.00 99.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
199.84 0.00 0.00 129.00 199.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 7021659144 W 148.41208822
299.84 0.00 0.00 229.00 299.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
399.84 0.00 0.00 329.00 399.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
499.84 0.00 0.00 429.00 499.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
599.84 0.00 0.00 529.00 599.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842,95 N 70.21659144 W 148.41208822
699.84 0.00 0.00 629.00 699.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
799.84 0.00 0.00 729.00 799.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 7021659144 W 148.41208822
899.84 0.00 0.00 829.00 899.84 0.00 0.00 0.00 0.00 0.00 0.00 5931326.50 696842.95 N 70.21659144 W 148.41208822
999.84 0.50 95.52 929.00 999.84 -0.33 0.44 0.44 -0.04 0.43 0.50 5931326.47 696843.39 N 70.21659133 W 148.4120
1099.84 0.00 180.00 1029.00 1099.84 -0.66 0.87 0.87 -0.08 0.87 0.50 5931326.44 696843.82 N 70.21659121 W 148.4120~
1199.84 0.50 156.47 1129.00 1199.84 -1.07 1.31 1.15 -0.48 1.04 0.50 5931326.04 696844.01 N 7021659012 W 148.412079 0
1299.84 0.00 0.00 1228.99 1299.83 -1.48 1.75 1.50 -0.88 1.22 0.50 5931325.65 696844.19 N 7021658903 W 148.41207840
1399.84 0.00 0.00 1328.99 1399.83 -1.48 1.75 1.50 -0.88 1.22 0.00 5931325.65 696844.19 N 70.21658903 W 148.41207840
1499.84 0.00 0.00 1428.99 1499.83 -1.48 1.75 1.50 -0.88 1.22 0.00 5931325.65 696844.19 N 70.21658903 W 148.41207840
1599.84 1.00 122.92 1528.99 1599.83 -2.33 2.62 2.38 -1.36 1.95 1.00 5931325.19 696844.93 N 70.21658773 W 148.41207249
1699.84 0.50 138.28 1628.98 1699.82 -3.61 3.92 3.67 -2.16 2.97 0.53 5931324.42 696845.98 N 70.21658554 W 148.41206424
1799.84 1.00 139.65 1728.97 1799.81 -4.92 5.23 4.96 -3.15 3.83 0.50 5931323.45 696846.86 N 70.21658284 W 148.41205734
1899.84 1.00 99.02 1828.96 1899.80 -6.49 6.90 6.57 -3.95 5.25 0.69 5931322.69 696848.31 N 70.21658065 W 148.41204584
1999.84 0.00 0.00 1928.95 1999.79 -7.18 7.77 7.36 -4.09 6.12 1.00 5931322.57 696849.17 N 70.21658027 W 148.41203888
2099.84 1.00 42.92 2028.95 2099.79 -7.13 8.65 7.54 -3.45 6.71 1.00 5931323.23 696849.75 N 70.21658202 W 148.41203409
2199.84 0.00 0.00 2128.94 2199.78 -7.07 9.52 7.83 -2.81 7.30 1.00 5931323.88 696850.33 N 7021658376 W 148.41202930
SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 1 of 6
Comments Measured Inclination Azimuth SubSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude'
Depth Section Departure
ft de de tt ft ft tt ft n n de 00 ft itUS ftUS
'L'Ly`J.t34 U./b l:i/.b:f LLLt5.y4 'L'L`J`J./Lf -/./3 lU.l/
2399.84 1.00 148.00 2328.93 2399.77 -9.24 11.70
2499.84 1.00 143.37 2428.91 2499.75 -10.96 13.44
2599.84 0.75 150.63 2528.90 2599.74 -12.46 14.97
2699.84 0.50 148.78 2628.90 2699.74 -13.52 16.06
2799.84 1.00 168.95 2728.89 2799.73 -14.68 17.35
2899.84 3.75 316.12 2828.83 2899.67 -12.14 20.32
2999.84 6.75 305.33 2928.40 2999.24 -3.10 29.44
3099.84 10.00 299.65 3027.32 3098.16 10.98 43.99
3199.84 13.00 293.12 3125.31 3196.15 29.64 63.91
Tie-In survey 3299.84 14.50 291.43 3222.44 3293.28 51.33 87.67
Top Window Inc+Trend 3318.00 14.99 291.89 3240.00 3310.84 55.52 92.29
Bottom Window 3335.00 17.03 291.89 3256.34 3327.18 59.79 96.98
3360.00 17.03 291.89 3280.24 3351.08 66.45 104.31
341728 16.27 299.00 3335.13 3405.97 81.75 120.70
3508.30 18.95 308.00 3421.89 3492.73 108.55 148.18
First MWD+IFR+MS 3604.62 22.48 313.00 3511.98 3582.82 142.42 182.23
C.4Z -3,Z`J /./D V./J D`J313Z3.41 b`Jb6OV./8 IV N.LIO~LfZ44 VV 146.41LVL0/4
9,76 -4.52 8.65 0.29 5931322.21 696851.71 N 70.21657910 W 148.41201845
11.33
12.73
13.72
14.79
12.21
3.11
11.52
31.41
55.13
59.75
64.43
71.75
88.13
115.30
148.55
3698.03 23.22 325.67 3598.11 3668 .95 178.44 218. 37
3793.18 24.38 338.06 3685.22 3756 .06 215.22 256. 65
3887.70 27.09 341.86 3770.36 3841 20 252.79 297. 67
3981.54 29.70 341.23 3852.90 3923 .74 293.17 342. 29
4075.41 32.88 340.59 3933.11 4003 .95 337.52 391. 04
182.94
217.30
253.15
293.22
338.50
-5.96
-7.23
-8.17
-9.40
-7.90
-2.14
5.55
14.27
23.26
24.96
26.71
29.44
36.46
5t.75
73.94
101.35
135.07
173.63
215.95
262.02
9.63
10.47
11.02
11.41
9.31
2.25
-10.09
-27.99
-49.99
-54.28
-58.63
-65.43
-80.23
-103.03
-128.84
-152.30
-17022
-184.22
-198.35
-214.31
4167.89 34.23 340.08 4010.18 4081.02 384.23 442.15 387.03 310.15 -231.51
4262.68 35.68 339.87 4087.87 4158.71 434.00 496.46 439.32 361.17 -250.11
4355.48 38.16 341.28 4162.05 4232.89 484.82 552.20 493.30 413.74 -268.63
4450.98 37.63 345.09 4237.43 430827 537.16 610.84 549.86 469.87 -285.60
4544.30 38.16 349.41 4311.08 4381.92 586.32 668.15 604.44 525.74 -298.23
4638.93 37.83 353.75 4385.67 4456.51 633.89 726.38 659.08 583.34 -306.77
4732.30 37.76 353.05 4459.45 453029 679.57 783.60 712.75 640.18 -313.34
4828.32 39.10 353.00 4534.67 4605.51 727.45 843.28 769.39 699.42 -320.59
4923.52 39.93 352.49 4608.11 4678.95 776.22 903.86 827.40 759.50 -32824
5016.87 40.35 351.73 4679.47 4750.31 825.07 964.03 885.54 819.11 -336.50
5111.93 39.62 350.46 4752.31 4823.15 87527 1025.12 945.06 879.46 -345.95
5205.39 39.08 350.45 4824.58 4895.42 924.35 1084.38 1003.11 937.90 355.78
5298.90 39.07 350.05 4897.18 4968.02 973.28 1143.32 1061.02 995.99 -365.76
5394.50 39.11 350.14 4971.38 5042.22 1023.42 1203.60 1120.39 10b5.37 -376.13
5488.17 39.14 350.58 5044.04 5114.88 1072.42 1262.70 1178.65 1113.64 -386.03
5583.50 39.71 350.82 5117.68 5188.52 1122.42 1323.25 1238.35 1173.39 -395.Si
5677.59 39.61 350.62 5190.12 5260.96 1172.00 1383.30 1297.63 1232.65 -405.50
5772.09 39.64 350.07 5262.90 5333.74 1221.98 1443.56 1357.26 1292.07 -415.60
5867.29 39.31 349.78 5336.39 5407.23 1272.41 1504.09 1417.25 1351.65 -426.19
0.08 5931320.80 696852.73 N 70.21657517 W 148.41201053
027 5931319.55 696853.61 N 70.21657169 W 148.41200374
0.25 5931318.62 696854.18 N 70.21656912 W 148.41199933
0.56 5931317.40 696854.61 N 70.21656576 W 148.41199615
4.62 5931318.85 696852.47 N 70.21656986 W 148.41201309
3.15 5931324.42 696845.26 N 70.21658559 W 148.41207006
3.35 5931331.79 696832.72 N 70.21660661 W 148.41216961
3.27 5931340.03 696814.60 N 70.21663042 W 148.41231394
1.55 5931348.45 696792.38 N 70.21665498 W 148.412491
2.77 5931350.04 696788.04 N 70.21665964 W 148.4125
12.00 5931351.67 696783.64 N 7021666442 W 148.41256110
0.00 5931354.23 696776.78 N 70.21667188 W 148:41261590
3.79 5931360.85 696761.80 N 70.21669105 W 148.41273529
4.19 5931375.54 696738.61 N 7021673281 W 148.41291923
4.10 5931397.05 696712.24 N 70.21679345 W 148.41312733
5.32 5931423.83 696688.07 N 70.21686831 W 148.41331655
5.38 5931457.08 696669.27 N 70.21696045 W 148.41346115
3.36 5931495.26 696654.28 N 70.21706579 W 148.41357402
2.80 5931537.20 696639.05 N 70.21718141 W 148.41368803
3.41 5931582.82 696621.90 N 70.21730725 W 148.41381672
1.49 5931630.49 696603.44 N 70.21743874 W 148.41395550
1.53 5931681.01 696583.52 N 7021757813 W 148.41410552
2.82 5931733.07 696563.64 N 70.21772175 W 148.41425490
2.51 5931788.73 696545.21 N 70.21787507 W 148.41439181
2.90 593184426 696531.13 N 70.21802773 W 148.41449370
2.84 5931901.61 696521.10 N 70.21818507 W 148.41456255
0.47 5931958.25 696513.04 N 70.21834036 W 148.4146
1.40 5932017.28 696504.25 N 7021850219 W 148.4146
0.94 5932077.14 696495.04 N 7021866635 W 148.41473584
0.69 5932136.51 696485.22 N 70.21882919 W 148.41480250
1.15 5932196.59 69647420 N 70.21899405 W 148.41487875
0.58 5932254.75 696462.86 N 7021915370 W 148.41495804
027 5932312.55 696451.36 N 7021931240 W 148.41503858
0.07 5932371.64 696439.45 N 70.21947463 W 148.41512224
0.30 5932429.63 696428.04 N 70.21963382 W 148.41520210
0.62 5932489.10 696416.70 N 70.21979704 W 148.41528104
0.17 5932548.09 696405.47 N 70.21995895 W 148.41535918
0.37 5932607.21 696393.82 N 7022012127 W 148.41544074
0.40 5932666.50 696381.69 N 7022028406 W 148.41552617
SurveyEditor Ver SP 2.1 Bid( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 2 of 6
Comments Measured Inclination Azimuth SubSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude'
Depth Section Departure
ft de de it ft ft ft ft ft ft 100 ft ftUS ftUS
byt~3.U~ :itf./l ~4y.41 b41U.tf1 b4t11.ti5 l:i'L'L.tf4 1bti4.:S/ 14//.U`J 141U.y5 -43/.UC U.ti/ b`J:i'L/'L5.4y t7yti:iby.'Lf7 IV /U.LN44bU4 W 14t5.41,b14U1
6057.66 38.48 348.37 5484.74 5555.58 1372.60 1623.38 1535.78 1468.85 -448.45 0.73 5932783.07 696356.38 N 70.22060423 W 148.41570576
6153.84 3820 348.21 5560.18 5631.02 1423.24 1683.04 1595.20 1527.27 -460.55 0.31 5932841.16 696342.76 N 70.22076383 W 148.41580347
6248.08 38.56 347.95 5634.06 5704.90 1473.01 1741.55 1653.51 1584.52 -472.64 0.42 5932898.07 696329.18 N 70.22092023 W 148.41590099
6343.42 38.88 346.61 5708.44 5779.28 1524.18 1801.19 1713.01 1642.69 -485.77 0.94 5932955.87 696314.54 N 7022107914 W 148.41600696
6437.39 38.65 346.38 5781.71 5852.55 1575.07 1860.03 1771.77 1699.90 -499.51 0.29 5933012.70 696299.31 N 7022123544 W 148.41611783
6531.63 37.97 347.47 5855.66 5926.50 1625.38 1918.45 1830.10 1756.80 -512.73 1.02 5933069.24 696284.61 N 70.22139089 W 148.41622451
6626.10 38.21 347.74 5930.01 6000.85 167521 1976.72 1888.25 1813.72 -525.24 0.31 5933125.81 696270.62 N 7022154639 W 148.41632545
672221 38.48 348.02 6005.39 6076.23 1726.04 2036.35 1947.73 1872.02 -537.76 0.33 5933183.75 696256.59 N 70.22170565 W 148.41642648
6816.82 38.68 348.90 6079.35 6150.19 1776.03 2095.35 2006.55 1929.83 -549.56 0.62 5933241.23 696243.29 N 7022186357 W 148.41652172
6912.32 39.08 350.05 6153.70 6224.54 1826.24 2155.29 2066.24 1988.76 -560.51 0.86 5933299.85 696230.81 N 7022202458 W 148.416610 6
7006.08 39.23 352.13 6226.40 6297.24 1874.89 2214.49 2125.02 2047.24 -569.68 1.41 5933358.07 696220.12 N 70.22218434 W 148.4166
7099.54 39.06 353.74 6298.89 6369.73 1922.28 2273.49 2183.39 2105.79 -576.93 1.10 5933416.41 696211.34 N 70.22234429 W 148.41674264
7193.28 39.27 354.40 6371.57 6442.41 1969.12 2332.69 2241.82 2164.67 -583.05 0.50 5933475.11 696203.69 N 70.22250516 W 148.41679201
7287.75 39.49 354.64 6444.59 6515.43 2016.25 2392.63 2300.94 2224.34 -588.77 028 5933534.60 696196.41 N 70.22266815 W 148.41683822
7381.91 38.98 355.15 6517.52 6588.36 2062.85 2452.18 2359.66 2283.66 -594.07 0.64 5933593.76 696189.57 N 70.22283021 W 148.41688103
7475.74 37.95 354.80 6590.99 6661.83 2108.45 2510.55 2417.24 2341.80 -599.18 1.12 5933651.74 696182.94 N 70.22298905 W 148.41692229
7570.13 36.96 355.02 6665.92 6736.76 2153.35 2567.95 2473.91 2398.97 -604.28 1.06 5933708.76 696176.36 N 70.22314524 W 148.41696342
7664.85 36.63 355.15 6741.77 6812.61 2197.62 2624.68 2529.92 2455.50 -609.14 0.36 5933765.14 696170.03 N 70.22329966 W 148.41700268
7757.97 35.89 355.83 6816.86 6887.70 2240.35 2679.76 2584.27 2510.40 -613.47 0.90 5933819.90 696164.26 N 70.22344966 W 148.41703768
7852.85 35.67 356.36 6893.83 6964.67 2283.02 2735.23 2638.95 2565.74 -617.25 0.40 5933875.13 696159.04 N 70.22360085 W 148.41706820
7946.70 35.09 357.40 6970.35 7041.19 2324.33 2789.57 2692.41 2620.00 -620.21 0.89 5933929.29 696154.67 N 70.22374908 W 148.41709212
8041.50 34.60 355.87 7048.15 7118.99 2365.66 2843.73 2745.77 2674.07 -623.39 1.06 5933983.25 696150.09 N 70.22389679 W 148.41711777
8135.58 36.27 354.21 7124.80 7195.64 2408.25 2898.27 2799.77 2728.40 -628.12 2.05 5934037.44 696143.94 N 7022404522 W 148.41715598
8229.35 38.17 352.91 7199.47 7270.31 2453.44 2954.99 2856.13 2784.76 -634.49 2.19 5934093.60 696136.10 N 70.22419918 W 148.41720745
8266.09 39.30 351.41 7228.13 7298.97 2472.08 2977.97 2879.03 2807.53 -637.63 4.00 5934116.28 696132.37 N 70.22426139 W 148.41723280
8325.59 40.19 351.09 7273.88 7344.72 250329 3016.02 2916.97 2845.13 -643.42 1.53 5934153.72 696125.60 N 70.22436411 W 148.41727952
8419.65 39.79 35029 7345.95 7416.79 2553.22 3076.46 2977.32 2904.78 -653.20 0.69 5934213.09 696114.27 N 70.22452707 W 148.41735845
8514.93 38.71 350.65 7419.73 7490.57 2603.13 3136.75 3037.51 296423 -663.18 1.16 5934272.26 696102.74 N 7022468948 W 148.4174~
8608.62 37.80 350.59 7493.30 7564.14 2651.08 3194.76 3095.43 3021.46 -672.63 0.97 5934329.22 696091.80 N 70.22484584 W 148.4175
8703.79 37.92 351.14 7568.44 763928 2699.22 3253.17 3153.73 3079.13 -681.91 0.38 5934386.62 696081.03 N 70.22500338 W 148.41759021
8796.29 38.02 349.35 7641.36 7712.20 2746.47 3310.07 3210.58 3135.21 -691.55 1.20 5934442.43 696069.93 N 70.22515659 W 148.41766806
8890.70 37.62 345.66 7715.95 7786.79 2796.00 3367.95 3268.44 3191.71 -704.06 2.43 5934498.58 696055.94 N 70.22531094 W 148.41776905
8986.26 39.39 341.03 7790.74 7861.58 2849.00 3427.42 3327.74 3248.66 -721.15 3.54 5934555.06 696037.38 N 70.22546652 W 148.41790695
9080.76 43.63 338.67 7861.50 7932.34 2906.45 3490.03 3389.79 3307.42 -742.76 4.78 5934613.23 696014.24 N 70.22562703 W 148.41808142
917521 47.00 335.53 7927.91 7998.75 2969.25 3557.17 3455.86 3369.23 -768.93 4.28 5934674.34 695986.47 N 70.22579590 W 148.41829263
9270.04 49.37 330.85 7991.15 8061.99 3036.88 3627.82 3524.44 3432.25 -800.84 4.45 5934736.50 695952.93 N 70.22596805 W 148.41855013
9366.56 51.59 325.93 8052.59 8123.43 3109.66 3702.25 3595.07 3495.59 -839.88 4.55 5934798.80 695912.25 N 70.22614109 W 148.41886523
9459.99 53.40 322.09 8109.49 8180.33 3183.10 3776.36 3663.63 3555.52 -883.45 3.79 5934857.57 695867.14 N 70.22630480 W 148.41921680
9555.52 56.86 320.35 8164.10 8234.94 3261.18 3854.72 3734.89 3616.59 -932.55 3.92 5934917.34 695816.47 N 70.22647163 W 148.41961305
9650.67 56.38 320.53 8216.45 8287.29 3340.44 3934.18 3806.99 3677.85 -983.15 0.53 593497725 69576429 N 70.22663896 W 148.42002144
SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 3 of 6
Comments Measured ~nclination Azimuth SubSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude'
Depth Section Departure
ft de de n n ft ft n n tt de 100 ft ftUS ftUS
MW D+IFR:AK
MWD+IFR+MS
9743.50
9840.48
9933.50
10028.64
10122.82
i 0217.39
10312.79
10346.03
10422.25
10453.43
10486.63
10512.72
10550.39
10582.78
10613.30
10639.40
10672.73
10701.38
10733.18
10765.83
55.31
54.36
54.07
56.83
57.85
56.98
57.44
58.00
63.02
69.93
77.06
84.06
91.30
98.29
98.81
98.62
94.39
92.96
91.37
93.10
319.73
319.91
320.49
319.97
319.96
32028
319.69
320.34
321.00
323.43
325.36
326.80
325.54
324.94
318.54
312.29
310.27
311.73
311.97
310.78
8268.56
8324.42
8378.81
8432.76
8483.59
8534.52
8586.18
8603.93
8641.44
8653.88
8663.31
8667.59
8669.11
8666.40
8661.$6
8657.90
8654.13
8652.29
8651.09
8649.82
8648.12
8646.04
8643.51
8641.24
8639.64
8339.40
8395.26
8449.65
8503.60
8554.43
8605.36
8657.02
8674.77
8712.28
8724.72
8734.15
8738.43
8739.95
8737.24
8732.70
8728.74
8724.97
8723.13
8721.93
8720.66
8718.96
8716.88
8714.35
8712.08
8710.48
3417.09
349623
3571.52
3649.69
3728.82
3808.33
3888.37
3916.42
3982.56
4010.97
4042.47
4067.82
4104.89
4136.76
4166.79
4192.57
4225.55
4254.01
4285.69
4318.19
4349.11
4379.87
4412.17
4442.43
4471.98
4010.99
4090.27
4165.73
4244.09
4323.37
4403.06
448326
4511.36
4577.68
4606.25
4638.06
4663.78
4701.40
4733.65
4763.84
4789.63
4822.74
4851.33
4883.11
4915.73
4946.99
4978.37
5011.68
5043.34
5074.32
3876.80
3948.94
4018.06
4090.08
4163.05
4236.70
4310.97
4337.05
4398.98
4425.96
4456.39
4481.22
4517.56
4548.61
4577.10
4600.41
462928
4654.19
4682.15
4710.78
4737.37
4763.20
4789.75
4814.03
4837.77
10797.13 93.13 305.54
10828.58 94.43 304.48
10861.99 94.26 300.01
10893.73 93.95 298.46
10924.75 91.96 299.45
10957.12
10990.25
11020.94
11053.95
11086.44
11117.48
11147.70
11179.91
11211.53
11244.15
90.39
91.04
90.73
90.11
89.94
89.77
90.69
91.21
90.01
88.91
299.10 8638.97 8709.81 4502.91 5106.68 4862.78
298. 92 8638.56 8709.40 4534.53 5139.81 4888.37
296. 20 8638.09 8708.93 4563.58 5170.49 4911.66
293. 88 8637.85 8708.69 4594.32 5203.50 4935.84
293. 97 8637.83 8708.67 4624.35 5235.99 4959.31
3736.81 -1032.39
3797.38 -1083.54
3855.35 -1131.84
3915.57 -1181.97
3976.28 -1232.97
4037.42 -1284.07
4098.85 -1335.63
4120.38 -1353.69
4171.69 -1395.72
419427 -1413.21
4220.14 -1431.72
4241.49 -1446.07
4272.73 -1467.01
4299.23 -1485.40
4322.92 -1504.08
4341.28 -1522.18
4363.12 -1547.06
4381.88 -1568.64
4403.08 -1592.31
4424.64 -1616.79
4443.95 -1641.35
4461.95 -1667.06
4479.72 -1695.23
4495.18 -1722.85
4510.18 -1749.96
4526.00 -1778.18
4542.07 -1807.16
4556.27 -1834.36
4570.24 -1864.26
4583.41 -1893.96
1.36 5935034.90 695713.53 N 70.22680001 W 148.42041884
0.99 5935094.11 695660.82 N 7022696547 W 148.42083166
0.59 5935150.80 695611.03 N 70.22712383 W 148.42122150
2.94 5935209.69 695559.35 N 70.22728833 W 148.42162607
1.08 5935269.05 695506.79 N 70.22745415 W 148.42203771
0.96 5935328.84
0.71 5935388.89
2.36 5935409.94
6.63 5935460.13
23.28 5935482.26
22.19 5935507.63
27.38 5935528.59
19.51 5935559.28
21.66 5935585.29
20.81 5935608.48
23.68 5935626.36
14.05 5935647.55
7.13 5935665.73
5.06 5935686.31
6.43 5935707.23
16.72 5935725.88
5.33 5935743.21
13.35 5935760.24
4.97 5935774.97
7.16 5935789.25
4.97 5935804.34
2.04 5935819.64
8.92 5935833.12
7.27 5935846.31
0.59 5935858.70
695454.12
695400.97
695382.36
695339.01
695320.94
695301.76
695286.86
695265.11
695246.04
695226.75
695208.18
695182.74
695160.68
695136.47
695111.43
695086.37
695060.21
695031.59
695003.57
694976.09
694947.46
694918.08
694890.52
694860.26
694830.23
694801.25
694772.63
694742.01
694711.86
694680.51
694649.42
69461923
694586.66
694554.80
694528.46
N 70.22762118 W 148.42245008
N 70.22778896 W 148.42286630
N 70.22784778 W 148.42301205
N 70.22798792 W 148.42335127
N 70.22804962 W 148.42349246
N 70.22812029 W 148.4236~
N 70.22817859 W 148.4237
N 7022826394 W 148.42392675
N 7022833633 W 148.42407520
N 70.22840103 W 148.42422597
N 70.22845119 W 148.42437207
N 70.22851084 W 148.42457289
N 70.22856207 W 148.42474704
N 7022861997 W 148.42493809
N 7022867887 W 148.42513568
N 70.22873159 W 148.42533397
N 70.22878076 W 148.42554141
N 70.22882929 W 148.42576877
N 70.22887151 W 148.42599174
N 70.22891247 W 148.42621050
N 7022895568 W 148.42643834
N 70.22899955 W 148.42667217
N 70.22903832 W 148.42689172
N 70.22907647 W 148.4271 ~
N 70.22911244 W 148.4273
N 70.22914479 W 148.42760430
N 7022917326 W 148.42783321
N 7022920271 W 148.42807813
N 70.22923083 W 148.42831938
N 70.22925761 W 148.42857044
N 7022928178 W 148.42881963
N 70.22930151 W 148.42906184
N 70.22931918 W 148.42932348
N 70.22933545 W 148.42957942
N 70.22934852 W 148.42979112
290.91 8637.91 8708.75 4652.72 5267.03 4981.26 4595.26 -1922.65 9.87 5935869.80
289.47 8637.79 8708.63 4679.84 5297.25 5001.88 4605.69 -1951.01 5.65 5935879.48
289.67 8637.25 8708.09 4708.59 5329.46 5023.71 4616.48 -1981.35 1.73 5935889.48
288.36 8636.92 8707.76 4736.67 5361.07 5045.01 4626.78 -2011.24 5.62 5935898.99
286.65 8637.22 8708.06 4765.23 5393.69 5066.47 4636.59 -2042.35 6.23 5935907.99
11276.28 88. 50 285.36 8637.95 8708.79 4792.95 5425.81 5087.08 4645.44 -2073. 23 4.21 5935916.04
11307.16 89. 25 281.73 8638.56 8709.40 4818.89 5456.69 5105.98 4652.67 -2103. 24 12.00 5935922.48
11340.22 89. 97 280.86 8638.78 8709.62 4845.94 5489.75 5125.30 4659.15 -2135. 66 3.42 5935928.11
11372.50 92. 68 280.45 8638.04 8708.88 4872.14 5522.01 5144.00 4665.12 -2167. 37 8.49 593593325
11399.20 93 20 280.25 8636,67 8707.51 4893.71 5548.68 5159.45 4669.91 -2193. 60 2.09 5935937.35
SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 4 of 6
Comments Measured ~nclination Azimuth SubSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude'
Depth Section Departure
ft de de it ft n n n n ft de 100 ft ftUS ftUS
114;i5."Ltf yl.ll "LifU.'L/ tfliS5.:i1 i3Nb.15 4y"L"L.C:S 55tS4./:i b1CU.4:5 4ti/b.:f3 -L"GLy.U/ b./y by;i5y4L.C4 by44y'L.tf3 IV /U.LLy;ibbU:f W 14tf.4JUU//4J
11467.23 91.00 278.66 8634.72 8705.56 4948.38 5616.68 5198.79 4681.58 -2260.58 5.05 5935947.27 694461.20 N 70.22938036 W 148.43033173
11498.34 91.72 276.34 8633.98 8704.82 4972.59 5647.78 5215.92 4685.64 -2291.42 7.81 5935950.53 694430.27 N 70.22939142 W 148.43058057
11530.22 91.48 276.10 8633.09 8703.93 4996.95 5679.64 5233.01 4689.09 -2323.10 1.06 5935953.15 694398.51 N 70.22940083 W 148.43083624
11562.90 91.76 275.19 8632.17 8703.01 5021.70 5712.31 5250.39 4692.31 -2355.60 2.91 5935955.52 694365.93 N 70.22940958 W 148.43109860
11594.06 91.38 273.24 8631.32 8702.16 5044.79 5743.46 5266.44 4694.60 -2386.67 6.37 5935956.99 694334.82 N 7022941581 W 148.43134929
11626.71 91.17 273.35 8630.59 8701.43 5068.64 5776.10 5282.96 4696.47 -2419.25 0.73 5935958.02 694302.20 N 70.22942091 W 148.43161229
11658.60 9128 272.05 8629.91 8700.75 5091.70 5807.98 5298.95 4697.97 -2451.10 4.09 5935958.69 694270.33 N 70.22942498 W 148.43186931
11689.94 91.28 269.18 8629.21 8700.05 5113.56 5839.32 5313.81 4698.31 -2482.43 9.16 5935958.21 694239.00 N 70.22942587 W 148.43212213
11722.18 90.90 266.99 8628.59 8699.43 5135.01 5871.55 5327.98 4697.23 -2514.64 6.89 5935956.29 694206.83 N 70.22942290 W 148.43238210
11754.97 91.00 267.19 8628.05 8698.89 5156.39 5904.34 5342.05 4695.57 -2547.39 0.68 5935953.78 694174.14 N 70.22941832 W 148.43264635
11786.28 91.17 267.34 8627.46 8698.30 5176.89 5935.64 5355.72 4694.07 -2578.65 0.72 5935951.47 694142.92 N 70.22941421 W 148.4328~
11818.08 91.17 267.14 8626.81 8697.65 5197.69 5967.43 5369.75 4692.54 -2610.41 0.63 5935949.11 694111.22 N 70.22941000 W 148.4331
11848.82 91.24 267.44 8626.16 8697.00 5217.82 5998.17 5383.47 4691.09 -2641.11 1.00 5935946.86 694080.57 N 7022940600 W 148.43340271
1188028 91.38 268.24 8625.44 8696.28 5238.65 6029.62 5397.93 4689.90 -2672.54 2.58 5935944.85 694049.19 N 70.22940273 W 148.43365635
11912.35 91.21 268.11 8624.72 8695.56 5260.02 6061.68 5412.98 4688.88 -2704.58 0.67 5935943.00 694017.18 N 70.22939991 W 148.43391497
11944.35 91.28 267.65 8624.02 8694.86 5281.23 6093.67 5428.01 4687.70 -2736.55 1.45 5935940.98 693985.25 N 70.22939665 W 148.43417298
11975.74 91.31 268.36 8623.31 8694.15 5302.08 6125.05 5442.95 4686.61 -2767.92 2.26 5935939.07 693953.93 N 70.22939363 W 148.43442608
12007.72 91.17 268.51 8622.62 8693.46 5323.50 6157.03 5458.52 4685.73 -2799.88 0.64 5935937.36 693922.01 N 70.22939122 W 148.43468401
12040.03 91.17 268.21 8621.96 8692.80 5345.11 6189.33 5474.36 4684.81 -2832.17 0.93 5935935.60 693889.75 N 70.22938866 W 148.43494460
12071.24 9121 267.95 8621.31 8692.15 5365.87 6220.53 5489.67 4683.76 -2863.35 0.84 5935933.74 693858.61 N 70.22938577 W 148.43519627
12103.46 91.38 267.85 8620.58 8691.42 5387.23 6252.75 5505.52 4682.58 -2895.54 0.61 5935931.72 693826.46 N 7022938251 W 148.43545605
12135.15 91.00 268.65 8619.93 8690.77 5408.38 6284.43 5521.42 4681.62 -2927.2t 2.79 5935929.93 693794.83 N 70.22937984 W 148.43571162
12166.92 89.15 271.85 8619.88 8690.72 5430.39 6316.20 5538.44 4681.76 -2958.98 11.63 5935929.24 693763.08 N 70.22938018 W 148.43596796
12198.84 88.77 272.34 8620.46 8691.30 5453.24 6348.11 5556.53 4682.92 -2990.87 1.94 5935929.57 693731.16 N 70.22938333 W 148.43622536
12231.81 89.46 272.69 8620.97 8691.81 5477.02 6381.08 5575.54 4684.37 -3023. 80
12263.35 89.91 272.73 8621.15 8691.99 5499.83 6412.62 5593.94 4685.86 -3055. 31
12295.06 89.84 273.06 8621.22 8692.06 5522.84 6444.33 5612.64 4687.46 -3086. 98
12327.49 87.77 272.16 8621.89 8692.73 5546.26 6476.75 5631.75 4688.94 -3119. 36
12359.01 88.02 272.36 8623.05 8693.89 5568.88 6508.25 5650.27 4690.18 -3150. 84
12391.86 87.85 271.84 8624.23 8695.07 5592.38 6541.08 5669.63 4691.38 -3183. 64
12423.02 87.61 271.67 8625.47 8696.31 5614.55 657221 5687.95 4692.34 -3214. 77
12454.03 87.68 272.10 8626.74 8697.58 5636.65 6603.19 5706.34 4693.36 -3245. 73
12486.54 88.81 271.40 8627.74 8698.58 5659.78 6635.69 5725.69 4694.35 -3278. 21
12518.97 89.87 272.14 8628.11 8698.95 5682.87 6668.12 5745.13 4695.35 -3310. 62
12549.96 89.87 273.07 8628.18 8699.02 5705.25 6699.11 5764.17 4696.76 -3341. 58
12580.48 89.60 272.94 8628.32 8699.16 5727.44 6729.63 5783.19 4698.36 -3372. 06
Last MWD+IFR+MS 12593.68 89.53 273.09 8628.42 8699.26 5737.03 6742.83 5791.45 4699.05 -3385.24
TD ( Projected ) 12650.00 89.53 273.09 8628.88 8699,72 5778.04 6799.14 5826.95 4702.09 -3441.48
Survey Type: Definitive Survey
NOTES: CB GYRO MS -( Camera-based gyro multishot -- Traditional optically referenced gyro surveys run on wireline
2.35 5935930.16 693698.21 N 70.22938725 W 148.43649115
1.43 5935930.83 693666.68 N 70.22939129 W 148.43674540
1.06 5935931.60 693634.98 N 70.22939563 W 148.43700099
6.96 5935932.23 693602.56 N 70.22939963 W 148.43726237
1.02 5935932.66 693571.07 N 7022940298 W 148.4375~
1.66 5935933.00 693538.25 N 70.22940623 W 148.43778114
0.94 5935933.14 693507.11 N 70.22940880 W 148.43803230
1.40 5935933.36 693476.13 N 70.22941155 W 148.43828222
4.09 5935933.50 693443.64 N 70.22941422 W 148.43854433
3.99 5935933.66 693411.21 N 70.22941692 W 148.43880591
3.00 5935934.26 693380.23 N 70.22942073 W 148.43905575
0.98 5935935.06 693349.72 N 7022942507 W 148.43930172
1.25 5935935.41 693336.53 N 70.22942695 W 148.43940810
0.00 5935936.98 693280.24 N 70.22943517 W 148.43986196
SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 5 of 6
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Alon9 Hole Closure NS EW DLS Northing Easting Latitude Longitude~
Depth Section Departure
ft de de ft n n it ft n n de 00 ft ftUS ftUS
- including "level rotor" gyros and Sperry-Sun SU3. Replaces ex-BP "PGMS" model.)
INC+TREND -( Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience
enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model.
MWD+IFR:AK -( MWD + IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field
disturbances in Alaska. Assumes a BHA sag correction is aqplied to enhance lnclination accuracy.
MWD + IFR + MS -( In-field referenced MWD with mult-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Leaal Description: Northing (Y) [ftUS] Easting (X) [ftUS]
Surtace : 1015 FSL 751 FEL S18 T10N R15E UM 5931326.50 696842.95
BHL : 436 FSL 4175 FEL S7 T10N R15E UM 5935936.98 693280.24
~
•
SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) 12-12\12-12\12-12A\12-12A Generated 6/28/2007 2:00 PM Page 6 of 6
TREE = Cameron
WELLHEAD~RAY/McEvoy
ACTUATOR = Baker
KB. ELEV = 70.84
BF. ELEV = 21.78
KOP = 3318'
Max Angle = 98.81
Datum MD =
Datum N D= 88~0' SS
~
~~L~ ~~F~
13-3/8" CSG, 72#, L-80, ID = 12.347" 2664'
I TOC on 7" Tieback I
I 2765' I
12-12A
Minimum ID = 3.725" @ 10238'
XN NIPPLE
As-Drilled
•
3213~ 9-5/8" X 7" Baker Tie Back Stem
(6.184" ID)
3213' 9'S/8" X 7" Baker ZXP Packer / Hanger
W/ 11.61' PBR ID = 7.5" ID
10173~ 4-1/2" X Nipple (3.813" ID)
1019~' ~" X 4-1/2" Baker S3 Produciion
Packer
10217' 4-112" X Nipple (3.813" ID)
~:
10238~ 4-1l2" XN Nipple (3.725" ID)
. 10251' 4-1/2" WL~
10414'
~4-1/2" 12.6#, L-80, Slotted Liner ~
PERFORATION SUMMARY
REF LOG: BHCS ON 07/20/81
ANGLE AT TOP PERF: 38 @ 9906'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpnlSqz DATE
2-7/8" 6 9906 - 9926 O 06/15/98
2- 8" 6 10031 - 10035 O 06/15
2-7/8' 6 10038 - 10041 O 5l98
3-1l8" 10041 - 10059 O 07l14i86
3-318" 4 041 - 10059 12/03/90
3-1/8" 4 100 10077 O 07/14/86
3-3/8" 4 10064 - 1 O 12/03/90
3-3/8" 4 10084 0100 O 12/03/90
3-1 /8" 4 1 4- 10162 02113/84
8 10178 - 10218 S 11l15/90
10230 - 10250 S 15/90
3-3/ " 4 10358 - 10360 S 11/1
PaT~ 10837'
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" ~087U~
~
~ ~ \
~
~
~
~~~ ~ ~ 11716' 4-1/2" Tam Sw ell Packer
~C -9,365
~~ ~
TOP OF 7" LNR 9619'
9601' TOP C7F 4-112" BKR KF3 BTM F'KR {fl811A!04} 5tuck~d
Udl2-7,'$" XN NIP, iD= 2.25" PLUG SET (03107/05) (
9651~ 4-1/2" TUBING TAII
9-5/8" CSG, 47#, L-80, ID = 8.681" 9933~
10030' FISH - PATCH RUBBER & ELEMENTS
1d821~ FISH - (7) FINGERS F/KIN
~ CALIPER 1/8"X5/16"X1"
~ 10826~ FISH - GLV
DATE REV BY COMMENTS DATE REV BY COMMENTS
07/26/81 ORIGINAL COMPLETION 08/14/04 LDK/TLP SET PACKER
10/26/01 RN/TP CORRECTIONS 03/06/05 KSB/TLH PKR XN NIPPLE CORRECT
02/06l03 ATD/TP DELETE WANER SAFEfY NOT 04/01/05 MGS/TLH XN PLUG SET (03/07/05)
10l26/03 CAO/TLP PULL PATCH @ 7926' 06l21/07 CC As Driiled
11(04/03 SVC/TLP CORRECTSQZ'd PERFS 11/90
01/30/04 GJB/TLP G~V GO
PRUDHOE BAY UNff
WELL: 12-12
PERMfT No: ~1810830
API No: 50-029-20610-00
SEC 18, T10N, R15E, 3639.14' FEL & 1237.52' FNL
BP Exploration (Alaska)
2217~ 4-1/2" X Nipple (3.813" ID)
SCHLUMBERGER
Survey report
Client ...................: BP Exploration (Alaska) Inc.
Field ....................: Prudhoe Bay
Well .....................: 12-12A
API number ...............: 50-029-20610-01
Engineer .................: I.Hernandez/J.Hudon
Rig :.....................: Nabors 7ES
STATE :...................: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Depth
GL above permanent.......: 29.96 ft
KB above permanent........ N/A Top Drive
DF above permanent.......: 70.84 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point----------
Latitude (+N/S-}.........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from Vsect Origin to target: 316.37 degrees
~
O
J
1
4
.~ [(c)2007 IDEAL ID12_OC_09]
~
17-Jun-2007 21:56:36 Page 1 of 8
Spud date ................: 24-May-07
Last survey date.........: 17-Jun-07
Total accepted surveys...: 184
I~ID of first survey.......: 0.00 ft
NID of last survey........: 12650.00 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2006
Magnetic date ............: 29-May-2007
Magnetic field strength..: 57668.01 G~
Magnetic dec (+E/W-)...... 24.03 degrees
Magnetic dip .............: 80.92 degrees
----- MWD survey Reference
Reference G ...............
Reference H ...............
Reference Dip ............:
Tolerance of G...........:
Tolerance of H............
Tolerance of Dip.........:
Criteria ---------
1002.67 mGal
57668.00 GAMA
80.92 degrees
(+/-) 2.50 mGal
(+/-)300.00 GAMA
(+/-) 0.45 degrees
----- Corrections ---------------
Magnetic dec (+E/W-).....: 24.03 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.03 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ....
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
•
•
SCHLUMBERGER Survey Report 17 -Jun-2007 21:56:36 Page 2 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (fty (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
2 99.84 0.00 0.00 99.84 99.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
3 199.84 0.00 0.00 100.00 199.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
4 299.84 0.00 0.00 100.00 299.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
5 399.84 0.00 0.00 100.00 399.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
6 499.84 0.00 0.00 100.00 499.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
7
8 599.84
699.84 0.00
0.00 0.00
0.00 100.00
100.00 599.84
699.84 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 BP
BP _CB
_CB GYRO
GYRO MS
MS •
9 799.84 0.00 0.00 100.00 799.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
10 899.84 0.00 0.00 100.00 899.84 0.00 0.00 0.00 0.00 0.00 0.00 BP CB GYRO MS
11 999.84 0.50 95.52 100.00 999.84 -0.33 -0.04 0.43 0.44 95.52 0.50 BP CB GYRO MS
12 1099.84 0.00 180.00 100.00 1099.84 -0.66 -0.08 0.87 0.87 95.52 0.50 BP CB GYRO MS
13 1199.84 0.50 156.47 100.00 1199.84 -1.07 -0.48 1.04 1.15 114.90 0.50 BP CB GYRO MS
14 1299.84 0.00 0.00 100.00 1299.83 -1.48 -0.88 1.22 1.50 126.00 0.50 BP CB GYRO MS
15 1399.84 0.00 0.00 100.00 1399.83 -1.48 -0.88 1.22 1.50 126.00 0.00 BP CB GYRO MS
16 1499.84 0.00 0.00 100.00 1499.83 -1.48 -0.88 1.22 1.50 126.00 0.00 BP CB GYRO MS
17 1599.84 1.00 122.92 100.00 1599.83 -2.33 -1.36 1.95 2.38 124.87 1.00 BP CB GYRO MS
18 1699.84 0.50 138.28 100.00 1699.82 -3.61 -2.16 2.97 3.67 125.98 0.53 BP CB GYRO MS
19 1799.84 1.00 139.65 100.00 1799.81 -4.92 -3.15 3.83 4.96 129.44 0.50 BP CB GYRO MS
20 1899.84 1.00 99.02 100.00 1899.80 -6.49 -3.95 5.25 6.57 126.94 0.69 BP CB GYRO MS
21 1999.84 0.00 0.00 100.00 1999.79 -7.18 -4.09 6.12 7.36 123.75 1.00 BP CB GYRO MS
22 2099.84 1.00 42.92 100.00 2099.79 -7.13 -3.45 6.71 7.54 117.20 1.00 BP _CB GYRO MS ~
23 2199.84 0.00 0.00 100.00 2199.78 -7.07 -2.81 7.30 7.83 111.04 1.00 BP CB GYRO MS
24 2299.84 0.75 137.63 100.00 2299.78 -7.73 -3.29 7.75 8.42 113.03 0.75 BP CB GYRO MS
25 2399.84 1.00 148.00 100.00 2399.77 -9.24 -4.52 8.65 9.76 117.57 0.29 BP CB GYRO MS
26 2499.84 1.00 143.37 100.00 2499.75 -10.96 -5.96 9.63 11.33 121.73 0.08 BP CB GYRO MS
27 2599.84 0.75 150.63 100.00 2599.74 -12.46 -7.23 10.47 12.73 124.61 0.27 BP CB GYRO MS
28 2699.84 0.50 148.78 100.00 2699.74 -13.52 -8.17 11.02 13.72 126.55 0.25 BP CB GYRO MS
29 2799.84 1.00 168.95 100.00 2799.73 -14.68 -9.40 11.41 14.79 129.47 0.56 BP CB GYRO MS
30 2899.84 3.75 316.12 100.00 2899.67 -12.14 -7.90 9.31 12.21 130.30 4.62 BP CB GYRO MS
[(c)2007 IDEAL ID12_OC_09]
SCHLUMBERGER Survey Report 17-Jun-2007 21:56:36 Page 3 of 8
---
Seq --------
Measured ------
Incl -------
Azimuth ------
Course -------
TVD - --------
Vertical -------
Displ ---------
Displ --------
Total -------
At -----
DLS - ---- ------
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
-
--- (ft)
-------- (deg)
------ (deg)
------- (ft)
------ (ft)
------- (ft)
- -------- (ft)
------- (ft)
--------- (ft)
-------- (deg)
------- 100f)
-----
- type (deg)
---- ------
31 2999.84 6.75 305.33 100.00 2999.24 -3.10 -2.14 2.25 3.11 133.58 3.15 BP _CB GYRO MS
32 3099.84 10.00 299.65 100.00 3098.16 10.98 5.55 -10.09 11.52 298.82 3.35 BP CB GYRO MS
33 3199.84 13.00 293.12 100.00 3196.14 29.64 14.27 -27.99 31.41 297.01 3.27 BP _CB GYRO MS
34 3299.84 14.50 291.43 100.00 3293.28 51.33 23.26 -49.99 55.13 294.95 1.55 BP CB GYRO MS
35 3318.00 14.99 291.89 18.16 3310.84 55.52 24.96 -54.28 59.75 294.70 2.77 BP _CB GYRO MS
36 3335.00 17.03 291.89 17.00 3327.18 59.79 26.71 -58.63 64.43 294.49 12.00 BP Blind
37
38 3360.00
3417.28 17.03
16.27 291.89
299.00 25.00
57.28 3351.08
3405.97 66.45
81.75 29.44
36.46 -65.43
-80.23 71.75
88.13 294.23
294.44 0.00
3.79 BP
BP _Blind
_Inc+Trend •
39 3508.30 18.95 308.00 91.02 3492.73 108.55 51.75 -103.03 115.30 296.67 4.19 BP Inc+Trend
40 3604.62 22.48 313.00 96.32 3582.81 142.42 73.94 -128.84 148.55 299.85 4.10 BP Inc+Trend
41 3698.03 23.22 325.67 93.41 3668.95 178.44 101.35 -152.30 182.94 303.64 5.32 BP MWD+IFR+MS
42 3793.18 24.38 338.06 95.15 3756.06 215.22 135.07 -170.22 217.30 308.43 5.38 BP MWD+IFR+MS
43 3887.70 27.09 341.86 94.52 3841.20 252.79 173.63 -184.22 253.15 313.31 3.36 BP MWD+IFR+MS
44 3981.54 29.70 341.23 93.84 3923.74 293.17 215.95 -198.35 293.22 317.43 2.80 BP MWD+IFR+MS
45 4075.41 32.88 340.59 93.87 4003.95 337.52 262.02 -214.31 338.50 320.72 3.41 BP MWD+IFR+MS
46 4167.89 34.23 340.08 92.48 4081.02 384.23 310.15 -231.51 387.03 323.26 1.49 BP MWD+IFR+MS
47 4262.68 35.68 339.87 94.79 4158.71 434.00 361.17 -250.11 439.32 325.30 1.53 BP MWD+IFR+MS
48 4355.48 38.16 341.28 92.80 4232.89 484.82 413.74 -268.63 493.30 327.01 2.82 BP MWD+IFR+MS
49 4450.98 37.63 345.09 95.50 4308.27 537.16 469.87 -285.60 549.86 328.71 2.51 BP MWD+IFR+MS
50 4544.30 38.16 349.41 93.32 4381.92 586.32 525.74 -298.23 604.44 330.44 2.90 BP MWD+IFR+MS
51 4638.93 37.83 353.75 94.63 4456.51 633.89 583.34 -306.77 659.08 332.26 2.84 BP MWD+IFR+MS
52 4732.30 37.76 353.05 93.37 4530.29 679.57 640.18 -313.34 712.75 333.92 0.47 BP ~MWD+IFR+MS •
53 4828.32 39.10 353.00 96.02 4605.51 727.45 699.42 -320.59 769.39 335.37 1.40 BP MInID+IFR+MS
54 4923.52 39.93 352.49 95.20 4678.95 776.22 759.50 -328.24 827.40 336.63 0.94 BP MWD+IFR+MS
55 5016.87 40.35 351.73 93.35 4750.31 825.07 819.11 -336.50 885.54 337.67 0.69 BP MWD+IFR+MS
56 5111.93 39.62 350.46 95.06 4823.15 875.27 879.46 -345.95 945.06 338.53 1.15 BP MWD+IFR+MS
57 5205.39 39.08 350.45 93.46 4895.42 924.35 937.90 -355.78 1003.11 339.23 0.58 BP MWD+IFR+MS
58 5298.90 39.07 350.05 93.51 4968.02 973.28 995.99 -365.76 1061.02 339.84 0.27 BP MWD+IFR+MS
59 5394.50 39.11 350.14 95.60 5042.22 1023.42 1055.37 -376.13 1120.39 340.38 0.07 BP MWD+IFR+MS
60 5488.17 39.14 350.58 93.67 5114.88 1072.42 1113.64 -386.03 1178.65 340.88 0.30 BP MWD+IFR+MS
[(C)2007 IDEAL ID12_OC_09]
SCHLUMBERGER Survey Report 17-Jun-2007 21:56:36 Page 4 of 8
Seq MeaSUred Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
61 5583.50 39.71 350.82 95.33 5188.52 1122.42 1173.39 -395.81 1238.35 341.36 0.62 BP MWD+IFR+MS
62 5677.59 39.61 350.62 94.09 5260.96 1172.00 1232.65 -405.50 1297.63 341.79 0.17 BP MWD+IFR+MS
63 5772.09 39.64 350.07 94.50 5333.74 1221.98 1292.07 -415.60 1357.26 342.17 0.37 BP MWD+IFR+MS
64 5867.29 39.31 349.78 95.20 5407.23 1272.41 1351.65 -426.19 1417.25 342.50 0.40 BP MWD+IFR+MS
65 5963.06 38.71 349.41 95.77 5481.65 1322.84 1410.95 -437.08 1477.09 342.79 0.67 BP MWD+IFR+MS
66 6057.66 38.48 348.37 94.60 5555.58 1372.60 1468.85 -448.45 1535.78 343.02 0.73 BP MWD+IFR+MS
67 6153.84 38.20 348.21 96.18 5631.02 1423.24 1527.27 -460.55 1595.20 343.22 0.31 BP _MWD+IFR+MS
68
6248.08
38.56
347.95
94.24
5704.90
1473.01
1584.52
-472.64
1653.51
343.39
0.42
BP •
_MWD+IFR+MS
69 6343.42 38.88 346.61 95.34 5779.28 1524.18 1642.69 -485.77 1713.01 343.53 0.94 BP MWD+IFR+MS
70 6437.39 38.65 346.38 93.97 5852.55 1575.07 1699.90 -499.51 1771.77 343.62 0.29 BP M[n1D+IFR+MS
71 6531.63 37.97 347.47 94.24 5926.50 1625.38 1756.80 -512.73 1830.10 343.73 1.02 BP MWD+IFR+MS
72 6626.10 38.21 347.74 94.47 6000.85 1675.21 1813.72 -525.24 1888.25 343.85 0.31 BP MWD+IFR+MS
73 6722.21 38.48 348.02 96.11 6076.23 1726.04 1872.02 -537.76 1947.73 343.97 0.33 BP MWD+IFR+MS
74 6816.82 38.68 348.90 94.61 6150.19 1776.03 1929.83 -549.56 2006.55 344.10 0.62 BP MWD+IFR+MS
75 6912.32 39.08 350.05 95.50 6224.54 1826.24 1988.76 -560.51 2066.24 344.26 0.86 BP MWD+IFR+MS
76 7006.08 39.23 352.13 93.76 6297.24 1874.89 2047.24 -569.68 2125.02 344.45 1.41 BP MWD+IFR+MS
77 7099.54 39.06 353.74 93.46 6369.73 1922.28 2105.79 -576.93 2183.39 344.68 1.10 BP MWD+IFR+MS
78 7193.28 39.27 354.40 93.74 6442.41 1969.12 2164.67 -583.05 2241.82 344.93 0.50 BP MWD+IFR+MS
79 7287.75 39.49 354.64 94.47 6515.43 2016.25 2224.34 -588.77 2300.94 345.17 0.28 BP Min7D+IFR+MS
80 7381.91 38.98 355.15 94.16 6588.36 2062.84 2283.66 -594.07 2359.66 345.42 0.64 BP MWD+IFR+MS
81 7475.74 37.95 354.80 93.83 6661.83 2108.45 2341.80 -599.18 2417.24 345.65 1.12 BP MWD+IFR+MS
82 7570.13 36.96 355.02 94.39 6736.76 2153.35 2398.97 -604.28 2473.91 345.86 1.06 BP _MWD+IFR+MS •
83 7664.85 36.63 355.15 94.72 6812.61 2197.62 2455.50 -609.14 2529.92 346.07 0.36 BP MWD+IFR+MS
84 7757.97 35.89 355.83 93.12 6887.69 2240.35 2510.40 -613.47 2584.27 346.27 0.90 BP MWD+IFR+MS
85 7852.85 35.67 356.36 94.88 6964.67 2283.01 2565.74 -617.25 2638.95 346.47 0.40 BP MWD+IFR+MS
86 7946.70 35.09 357.40 93.85 7041.19 2324.33 2620.00 -620.21 2692.41 346.68 0.89 BP _MWD+IFR+MS
87 8041.50 34.60 355.87 94.80 7118.99 2365.65 2674.07 -623.39 2745.77 346.88 1.06 BP MWD+IFR+MS
88 8135.58 36.27 354.21 94.08 7195.64 2408.25 2728.40 -628.12 2799.77 347.04 2.05 BP _MWD+IFR+MS
89 8229.35 38.17 352.91 93.77 7270.31 2453.43 2784.76 -634.49 2856.13 347.16 2.19 BP MWD+IFR+MS
90 8266.09 39.30 351.41 36.74 7298.97 2472.08 2807.53 -637.63 2879.03 347.20 4.00 BP _MWD+IFR+MS
[(c)2007 IDEAL ID12_OC_09]
SCHLUMBERGER Survey Report 17 -Jun-2007 21:56:36 Page 5 of 8
---
Seq --------
Measured ------
Incl -------
Azimuth ------
Course --------
TVD --------
Vertical -------
Displ ---------
Displ -------
Total --------
At -----
DLS - ---- ------
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
-
--- (ft)
-------- (deg)
------ (deg)
------- (ft)
------ (ft)
-------- (ft)
-------- (ft)
------- (ft)
--------- (ft)
------- (deg)
-------- 100f)
-----
- type (deg)
---- ------
---
91 --------
8325.59 ------
40.19 -------
351.09 ------
59.50 --------
7344.72 --------
2503.29 -------
2845.13 ---------
-643.42 -------
2916.97 --------
347.26 -----
1.53 -
BP ---- ------
MWD+IFR+MS
92 8419.65 39.79 350.29 94.06 7416.78 2553.21 2904.78 -653.20 2977.32 347.33 0.69 BP MWD+IFR+MS
93 8514.93 38.71 350.65 95.28 7490.57 2603.13 2964.23 -663.18 3037.51 347.39 1.16 BP _MWD+IFR+MS
94 8608.62 37.80 350.59 93.69 7564.14 2651.08 3021.46 -672.63 3095.43 347.45 0.97 BP MWD+IFR+MS
95 8703.79 37.92 351.14 95.17 7639.28 2699.22 3079.13 -681.91 3153.73 347.51 0.38 BP MWD+IFR+MS
96 8796.29 38.02 349.35 92.50 7712.20 2746.47 3135.21 -691.55 3210.58 347.56 1.20 BP MWD+IFR+MS
97 8890.70 37.62 345.66 94.41 7786.79 2795.99 3191.71 -704.06 3268.44 347.56 2.43 BP _MWD+IFR+MS
98
8986.26
39.39
341.03
95.56
7861.58
2849.00
3248.66
-721.15
3327.74
347.48
3.54
BP
_MWD+IFR+MS •
99 9080.76 43.63 338.67 94.50 7932.33 2906.45 3307.42 -742.76 3389.79 347.34 4.78 BP MWD+IFR+MS
100 9175.21 47.00 335.53 94.45 7998.75 2969.25 3369.23 -768.93 3455.86 347.14 4.28 BP MWD+IFR+MS
101 9270.04 49.37 330.85 94.83 8061.99 3036.87 3432.25 -800.84 3524.44 346.87 4.45 BP M[n]D+IFR+MS
102 9366.56 51.59 325.93 96.52 8123.43 3109.66 3495.59 -839.88 3595.07 346.49 4.55 BP MWD+IFR+MS
103 9459.99 53.40 322.09 93.43 8180.32 3183.10 3555.52 -883.45 3663.63 346.05 3.79 BP MWD+IFR+MS
104 9555.52 56.86 320.35 95.53 8234.93 3261.18 3616.59 -932.55 3734.89 345.54 3.92 BP MWD+IFR+MS
105 9650.67 56.38 320.53 95.15 8287.29 3340.44 3677.85 -983.15 3806.99 345.03 0.53 BP MWD+IFR+MS
106 9743.50 55.31 319.73 92.83 8339.40 3417.09 3736.81 -1032.39 3876.80 344.56 1.36 BP MWD+IFR+MS
107 9840.48 54.36 319.91 96.98 8395.26 3496.22 3797.38 -1083.54 3948.94 344.07 0.99 BP MWD+IFR+MS
108 9933.50 54.07 320.49 93.02 8449.65 3571.51 3855.35 -1131.84 4018.06 343.64 0.59 BP MWD+IFR+MS
109 10028.64 56.83 319.97 95.14 8503.60 3649.69 3915.57 -1181.97 4090.08 343.20 2.94 BP MWD+IFR+MS
110 10122.82 57.85 319.96 94.18 8554.42 3728.82 3976.28 -1232.97 4163.05 342.77 1.08 BP MWD+IFR+MS
111 10217.39 56.98 320.28 94.57 8605.35 3808.33 4037.42 -1284.07 4236.70 342.36 0.96 BP MWD+IFR+MS
112
10312.79
57.44
319.69
95.40
8657.02
3888.37
4098.85
-1335.63
4310.97
341.95
0.71
BP _
_MWD+IFR+MS •
113 10346.03 58.00 320.34 33.24 8674.77 3916.42 4120.38 -1353.69 4337.05 341.81 2.36 BP MWD+IFR+MS
114 10422.25 63.02 321.00 76.22 8712.28 3982.55 4171.69 -1395.72 4398.98 341.50 6.63 BP Inc+Trend
115 10453.43 69.93 323.43 31.18 8724.72 4010.97 4194.27 -1413.21 4425.96 341.38 23.28 BP MWD+IFR
116 10486.63 77.06 325.36 33.20 8734.15 4042.47 4220.14 -1431.72 4456.39 341.26 22.19 BP MWD+IFR
117 10512_72 84.06 326.80 26.09 8738.42 4067.82 4241.49 -1446.07 4481.22 341.17 27.38 BP MWD+IFR
118 10550.39 91.30 325.54 37.67 8739.95 4104.88 4272.73 -1467.01 4517.56 341.05 19.51 BP MWD+IFR
119 10582.78 98.29 324.94 32.39 8737.24 4136.76 4299.23 -1485.40 4548.61 340.94 21.66 BP MWD+IFR
120 10613.30 98.81 318.54 30.52 8732.70 4166.79 4322.92 -1504.08 4577.10 340.82 20.81 BP MWD+IFR
[(C)2007 IDEAL ID12_OC_09]
SCHLUMBERGER Survey Report 17-Jun-2007 21:56:36 Page 6 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
121 10639.40 98.62 312.29 26.10 8728.74 4192.57 4341.28 - 1522.18 4600.41 340.68 23.68 BP MWD+IFR+MS
122 10672.73 94.39 310.27 33.33 8724.96 4225.54 4363.12 - 1547.06 4629.28 340.48 14.05 BP MWD+IFR+MS
123 10701.38 92.96 311.73 28.65 8723.13 4254.01 4381.88 - 1568.64 4654.19 340.30 7.13 BP MWD+IFR+MS
124 10733.18 91.37 311.97 31.80 8721.93 4285.69 4403.08 - 1592.31 4682.15 340.12 5.06 BP MWD+IFR+MS
125 10765.83 93.10 310.78 32.65 8720.65 4318.19 4424.64 - 1616.79 4710.78 339.93 6.43 BP MWD+IFR+MS
126 10797.13
127 10828.58
128 10861.99
129 10893.73
130 10924.75
131 10957.12
132 10990.25
133 11020.94
134 11053.95
135 11086.44
136 11117.48
137 11147.70
138 11179.91
139 11211.53
140 11244.15
141 11276.28
142 11307.16
143 11340.22
144 11372.50
145 11399.20
146 11435.28
147 11467.23
148 11498.34
149 11530.22
150 11562.90
93.13 305.54 31.30 8718.95 4349.11 4443.95 -1641.35 4737.38 339.73 16.72 BP _MWD+IFR+MS
94.43 304.48 31.45 8716.88 4379.87 4461.95 -1667.06 4763.20 339.51 5.33 BP _M[n1D+IFR+MS
94.26
300.01
33.41
8714.35
4412.17
4479.72
-1695.23
4789.75
339.27
13_35
BP
_MWD+IFR+MS •
93.95 298.46 31.74 8712.07 4442.42 4495.18 -1722.85 4814.03 339.03 4.97 BP _MWD+IFR+MS
91.96 299.45 31.02 8710.48 4471.98 4510.18 -1749.96 4837.77 338.79 7.16 BP_ MWD+IFR+MS
90.39 299.10 32.37 8709.81 4502.91 4526.00 -1778.18 4862.78 338.55 4.97 BP _MWD+IFR+MS
91.04 298.92 33.13 8709.40 4534.53 4542.07 -1807.16 4888.38 338.30 2.04 BP_ Min7D+IFR+MS
90.73 296.20 30.69 8708.92 4563.58 4556.27 -1834.36 4911.66 338.07 8.92 BP_ MWD+IFR+MS
90.11 293.88 33.01 8708.68 4594.32 4570.24 -1864.26 4935.84 337.81 7.27 BP_ Min1D+IFR+MS
89.94 293.97 32.49 8708.67 4624.35 4583.41 -1893.96 4959.31 337.55 0.59 BP_ MWD+IFR+MS
89.77 290.91 31.04 8708.75 4652.72 4595.26 -1922.65 4981.26 337.30 9.87 BP_ MWD+IFR+MS
90.69 289.47 30.22 8708.63 4679.84 4605.69 -1951.01 5001.88 337.04 5.65 BP_ MWD+IFR+MS
91.21 289.67 32.21 8708.09 4708.58 4616.48 -1981.35 5023.71 336.77 1.73 BP_ MWD+IFR+MS
90.01 288.36 31.62 8707.75 4736.67 4626.78 -2011.25 5045.02 336.51 5.62 BP_ MWD+IFR+MS
88.91 286.65 32.62 8708.06 4765.23 4636.59 -2042.35 5066.47 336.23 6.23 BP MWD+IFR+MS
88.50 285.36 32.13 8708.79 4792.95 4645.45 -2073.23 5087.09 335.95 4.21 BP MWD+IFR+MS
89.25
281.73
30.88
8709.39
4818.89
4652.68
-2103.24
5105.98
335.67
12.00
BP_
MWD+IFR+MS •
89.97 280.86 33.06 8709.62 4845.94 4659.15 -2135.66 5125.30 335.37 3.42 BP_ MWD+IFR+MS
92.68 280.45 32.28 8708.87 4872.14 4665.12 -2167.37 5144.01 335.08 8.49 BP_ MWD+IFR+MS
93.20 280.25 26.70 8707.50 4893.71 4669.91 -2193.60 5159.45 334.84 2.09 BP_ MWD+IFR+MS
91.11 280.27 36.08 8706.15 4922.83 4676.33 -2229.07 5180.43 334.51 5.79 BP_ MWD+IFR+MS
91.00 278.66 31.95 8705.56 4948.38 4681.58 -2260.58 5198.79 334.23 5.05 BP MWD+IFR+MS
91.72 276.34 31.11 8704.82 4972.59 4685.64 -2291.42 5215.92 333.94 7.81 BP MWD+IFR+MS
91.48 276.10 31.88 8703.93 4996.95 4689.09 -2323.10 5233.01 333.65 1.06 BP MWD+IFR+MS
91.76 275.19 32.68 8703.01 5021.70 4692.31 -2355.60 5250.39 333.34 2.91 BP MWD+IFR+MS
[(C)2007 IDEAL ID12_OC_09]
SCHLUMBERGER Survey Report 17 -Jun-2007 21:56:36 Page 7 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
151 11594.06 91.38 273.24 31.16 8702.15 5044.79 4694.60 -2386.67 5266.44 333.05 6.37 BP MtnID+IFR+MS
152 11626.71 91.17 273.35 32.65 8701.43 5068.64 4696.47 -2419.25 5282.96 332.75 0.73 BP MWD+IFR+MS
153 11658.60 91.28 272.05 31.89 8700.75 5091.70 4697.97 -2451.10 5298.95 332.45 4.09 BP M[n7D+IFR+MS
154 11689.94 91.28 269.18 31.34 8700.04 5113.56 4698.31 -2482.43 5313.81 332.15 9.16 BP MWD+IFR+MS
155 11722.18 90.90 266.99 32.24 8699.43 5135.01 4697.23 -2514.64 5327.98 331.84 6.89 BP MWD+IFR+MS
156 11754.97 91.00 267.19 32.79 8698.89 5156.39 4695.57 -2547.39 5342.05 331.52 0.68 BP MWD+IFR+MS
157 11786.28 91.17 267.34 31.31 8698.29 5176.89 4694.07 -2578.65 5355.73 331.22 0.72 BP _MWD+IFR+MS
158
11818.08
91.17
267.14
31.80
8697.65
5197.69
4692.54
-2610.41
5369.75
330.91
0.63
BP
_MWD+IFR+MS ~
159 11848.82 91.24 267.44 30.74 8697.00 5217.82 4691.09 -2641.11 5383.47 330.62 1.00 BP MWD+IFR+MS
160 11880.28 91.38 268.24 31.46 8696.28 5238.65 4689.91 -2672.54 5397.93 330.32 2.58 BP MWD+IFR+MS
161 11912.35 91.21 268.11 32.07 8695.55 5260.02 4688.88 -2704.58 5412.99 330.02 0.67 BP MWD+IFR+MS
162 11944.35 91.28 267.65 32.00 8694.86 5281.23 4687.70 -2736.55 5428.01 329.72 1.45 BP Min7D+IFR+MS
163 11975.74 91.31 268.36 31.39 8694.15 5302.08 4686.61 -2767.92 5442.95 329.43 2.26 BP M[n7D+IFR+MS
164 12007.72 91.17 268.51 31.98 8693.46 5323.50 4685.74 -2799.88 5458.52 329.14 0.64 BP M[n7D+IFR+MS
165 12040.03 91.17 268.21 32.31 8692.80 5345.11 4684.81 -2832.17 5474.36 328.85 0.93 BP M[n7D+IFR+MS
166 12071.24 91.21 267.95 31.21 8692.15 5365.87 4683.77 -2863.35 5489.67 328.56 0.84 BP MWD+IFR+MS
167 12103.46 91.38 267.85 32.22 8691.42 5387.23 4682.59 -2895.54 5505.52 328.27 0.61 BP MWD+IFR+MS
168 12135.15 91.00 268.65 31.69 8690.76 5408.38 4681.62 -2927.21 5521.42 327.98 2.79 BP MWD+IFR+MS
169 12166.92 89.15 271.85 31.77 8690.72 5430.39 4681.76 -2958.98 5538.45 327.71 11.63 BP MWD+IFR+MS
170 12198.84 88.77 272.34 31.92 8691.30 5453.24 4682.92 -2990.87 5556.53 327.43 1.94 BP MWD+IFR+MS
171
172 12231.81
12263.35 89.46
89.91 272.69
272.73 32.97
31.54 8691.81
8691.98 5477.02
5499.83 4684.37
4685.86 -3023.80
-3055.31 5575.54
5593.94 327.16
326.89 2.35
1.43 BP
BP _MWD+IFR+MS
_MWD+IFR+MS ~
173 12295.06 89.84 273.06 31.71 8692.05 5522.84 4687.46 -3086.98 5612.64 326.63 1.06 BP MWD+IFR+MS
174 12327.49 87.77 272.16 32.43 8692.73 5546.26 4688.94 -3119.36 5631.75 326.37 6.96 BP M[nTD+IFR+MS
175 12359.01 88.02 272.36 31.52 8693.89 5568.88 4690.18 -3150.84 5650.27 326.11 1.02 BP MWD+IFR+MS
176 12391.86 87.85 271.84 32.85 8695.07 5592.38 4691.38 -3183.64 5669.63 325.84 1.66 BP MWD+IFR+MS
177 12423.02 87.61 271.67 31.16 8696.30 5614.55 4692.34 -3214.76 5687.95 325.58 0.94 BP MWD+IFR+MS
178 12454.03 87.68 272.10 31.01 8697.58 5636.65 4693.36 -3245.73 5706.35 325.33 1.40 BP MWD+IFR+MS
179 12486.54 88.81 271.40 32.51 8698.58 5659.78 4694.35 -3278.21 5725.69 325.07 4.09 BP MWD+IFR+MS
180 12518.97 89.87 272.14 32.43 8698.95 5682.87 4695.35 -3310.62 5745.13 324.81 3.99 BP MWD+IFR+MS
[(C)2007 IDEAL ID12_OC_09~
SCHLUMBERGER Survey Report 17 -Jun-2007 21:56:36 Page 8 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
181 12549.96 89.87 273.07 30.99 8699.02 5705.25 4696.76 - 3341.58 5764.17 324.57 3.00 BP MWD+IFR+MS
182 1258Q.48 89.60 272.94 30.52 8699.16 5727.44 4698.36 - 3372.06 5783.20 324.33 0.98 BP MWD+IFR+MS
183 12593.68 89.53 273.09 13.20 8699.26 5737.03 4699.05 - 3385.24 5791.46 324.23 1.25 BP MWD+IFR+MS
184 12650.00 89.45 273.09 56.32 8699.76 5778.03 4702.09 - 3441.48 5826.95 323.80 0.14 Projected TD
[(c)2007 IDEAL ID12_OC_09] ~
•
~ ~
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken
Well No 12-12A Date Dispatched: 27-May-07
Installation/Rig Nabors 7ES Dispatched By: Franklin Medina
LWD Log Delivery V1.1,10-02-03
Data No Of Prints No of Floppies
Surveys 2 1
Received By: Please sign and return to:
Drilling & Measurements LWD Division
~~ 2525 Gambell Street, Suite 400
~ ~ ~~ ~ ~ Anchorage,Alaska 99501
nroselC~slb.com
Fax:907-561-8317
~~~~ ~`~~
06/15/07
~
~
j ~ :~
Schiumherger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
~ p~ -0~19
Well Jnh !t
1 nn nne~rintinn
NO. 4304
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suitt+ 100
Anchorage, AK 99501
Fieid: Prudhoe Bay
11~4n RI f`nlnr (`f1
P1-16 11637331 WARMBACKS & SBHPS 05/04/07 1
P1-14 11637332 WARMBACKS & SBHPS OS/05/07 1
01-05 11626486 USIT (CEMENT) 05/13l07 1
07-OS 11626486 USIT (CORROSION) 05/13I07 1
MPH-14 11638633 INCLINOMETER-DIRECTION LOG 05/13/07 1
MPS-01A 1159454 MDT 05/28/07 9
11-18 11626097 USIT 05/26/07 1
09-15A 11629015 SCMT 06/01/07 1
12-12A 11695061 CEMENT IMAGE 8 BOND LOG 05/28107 1
03-36A 11629014 SCMT 05/31107 1
S-401 11626492 SCMT 06/11/07 1
r ~~.r..a~ ~v~~1~VYYLG/VG n~vc~r ~ 07 JIVI~IItlV N17V RCIURIY11717 VIYC NIJPT CNli17 I V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. ~ ~ , ~' ~` ~ ~ ~ ~t~ ~~~ .., ~ ~?
Anchorage, Alaska 99508 ~,~ ~~t~_„ ~ ~+~~~ ~~~ ~~~--=~~~'"~
Date Delivered:
el.: .,
~~i*, ~ `, a, +~4 s~~ ~"3~a, a A~)n~. ~~~8t~~'i'~1~~4~1:~
. . r^~i~ ;,~`.s~ ~'~~.~a,
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth /
Received by: ~_~'°'jj
12-12A • ~ Page 1 of 1
Maunder, Thomas E (DOA)
From: Nadem, Mehrdad (NademM@BP.com]
Sent: Tuesday, May 22, 2007 3:39 PM
To: tom_maunder@admin.state.ak.us
Subject: 12-12A a~^~ ,. ~ ~~
Attachments: 12-12A Summary of Drilling Completion.ZlP
Tom,
I changed the mud weight for 12-12A due to potential over pressure in the Ugu. This change was made to ensure
we stayed over balanced to the formation. Attached table is the mud weight for the intermediate hole:
8.5" intermediate hole
Depth MD
(ft) Mud Wt.
(Ib/gal) Plastic Viscosity
(cp) Yield Point
(Ib/100ft2) API Fluid Loss
(ml/30min) HTHP Fiuid Loss @ 200F
(ml/30min) pH Drill Solids
(%) MBT
3,500 Mi!ling 10.0 15-22 30 - 40 6- 8 N/C 9-9.5 < 6.0 <20
3,500- 9,350' 10.0 - 10.5 8- 12 20 - 26 4.0 - 8.0 N/C 9-9.5 < 6.0 <20
9,350' - 10,364'
(9493 MD -HRZ) 11.5 16 - 20 25 - 30 < 6.0 < 10.0 9-9.5 < 6.0 <20
Regrads,
Mehrdad Nadem
Operations Drilling Engineer
907/564-5941
«12-12A Summary of Drilling Completion.ZlP»
7/6/2007
4.I
Mud Program
8.5" intermediate hole
6-1/8" Production hole
u
Type: FloPro SF
Depth (ft) Density
~ppJ) pV YP LSRV MBT pH
10,364,-12,639' 8.4 - 8.5 8- 15 24 - 30 >20,000 < 6 ppb 9- 9.5
Logging Program
9-5/8" Surface Casing: Sample Catchers - None
Drillin : N/A
O en Hole: N/A
Cased Hole: USIT/CBL/CCL
8-1/2" Intermediate: Sample Catchers - None
Drilling: Dir/GR/Res/MWD/PWD
O en Hole: None
Cased Hole: None
6-1/8" Production: Sample Catchers - as required by Geology
Drillin : Dir/GR/Stratasteer/Resistivit /Azimuthal Densit
Open Hole: None
Cased Hole: None
Cementing Program
Casing String: 7", 26#, L-80, BTC-M x TC-II Tieback
Slurry Design Basis: Lead slurry: None planned. o
Tail slurry: 450 of the 9-5/8 X 7" annulus to 2,900 MD with 0/o excess.
Pre-Flush 20 bbls of viscosified seawater
Freeze Prot 82 bbls of diesel
Fluids Sequence / Volume: S acer None lanned
Lead Slur None lanned
Tail Slur 13.2 bbls / 74 cf / 63.78 sxs Class 'G', 15.8 ; 1.16 cf/sk.
12-12A Well Plan
Re: 12-12A Revised Work Scope for Pre Rig Program
Mehrdad,
You know better of the well conditions. Main issue is placing cement proximate to the packer. 200'
outside and 300' inside should do it nicely.
Call or message with any questions.
Tom Maunder, PE
AOGCC
Nadem, Mehrdad wrote, On 4/19/2007 3:16 PM:
Tom,
Bas~d on my discussion with the Well Graups Operations on th~ Slope, we v~auld like to slightly
moc[ified the pre rig uvork for 12-12. As discussed during our telepf~one conversa#ions, AOGCC has
r~o objection with proceeding with thsse modification;
1. C MIRU CTU. RIH to above the PBR assembly at 9,558' MD. With a tubing punch, punch 5' of
holes in the tubing. Punch holes starting at ~ 9,500' MD- please note that tubing tally for the 5-1/2" is
incomplete. As such, I am unable to determine whether the 9,500' would correspond to location of a
tubing collar.
2. F Full bore circulate the IA and tubing to either seawater or KCI.
3. C Lay cement on top of the plug that is stuck in the tubing tail. This plug is set at 9,601'. Pump
12.51 of cement for the plug and abandon operations. This would leave 300' of cement in the tubing
and ~200' of cement in the 9-5/8" x 5.5" inner annulus. There is no concern if the top of cement is
higher than 9,300' MD. The regulatory limit requires 100' of cement plug.
4. F CMIT X IA to 3500 psi for 30 minutes.
5. E Jet cut the tubing at 3800'.
6. O Set BPV, pull wellhouse and level pad.
Please ca~l if you have any questions ~r cor~nments.
Mehrdad Nadem
Operations Drilling Engineer
Phone:907/564-5941
CeII: 907/440-0213
Emai I: nademmC bp.com
From: Thomas Maunder ~mailto;tam_rnaunder~admin.state,ak.us]
Sent: Tuesday, April 17, 2007 1:37 PM
To: Hobbs, Greg S (ANC)
Subject: Re: 12-12A Revised Work Scope for Pre Rig Program
1 of 2 4/19/2007 3:38 PM
~ ~
Re: 12-12A Revised Work Scope for Pre Rig Program
~ ~
I,l~t~~k;~ 1€~r ~c~c~inentin~ C:~re~,
Tom
Hobbs, Greg S(ANC) wrote, On 4/17/2007 1:28 PM:
AI I-
Following the failed attempt to retrieve the plug from the tailpipe on 12-12 A with Coil, and
discussions with Tom Maunder and Jay Grover, the following plan will be followed to ready
12-12 for its upcoming Sag Sidetrack:
1. C MIRU CTU. RIH to a point within a joint or two above the PBR assembly at 9558' MD. With
a tubing punch, punch 5' of holes in the tubing. Circulate the IA and tubing to to 9.8 brine. Lay
cement on top of the plug that is stuck in the tubing tail. Pump a 100' balanced plug through the
holes so that there is 100' of cement outside and inside the tubing to abandon the perforated
intervals below.
2. F CMIT X IA to 3500 psi.
2. E Jet cut the tubing at 3800'.
3. F Freeze protect the top ~100' of the well with diesel (IA and tubing).
4. O Set BPV, pull wellhouse and level pad.
I will add this to the pre rig schedule tommorrow. Please respond with any comments or
questions. My cell is 980-1439.
Greg
2 of 2 4/19/2007 3:38 PM
12-12A Revised Work Scope for Pre Rig Program
~ ~
All-
Following the failed attempt to retrieve the plug from the tailpipe on 12-12 A with Coil, and discussions
with Tom Maunder and Jay Grover, the following plan will be followed to ready 12-12 for its upcoming
Sag Sidetrack:
1. C MIRU CTU. RIH to a point within a joint or two above the PBR assembly at 9558' MD. With a
tubing punch, punch 5' of holes in the tubing. Circulate the IA and tubing to to 9.8 brine. Lay cement on
top of the plug that is stuck in the tubing tail. Pump a 100' balanced plug through the holes so that there
is 100' of cement outside and inside the tubing to abandon the perforated intervals below.
2. F CMIT X IA to 3500 psi.
2. E Jet cut the tubing at 3800'.
3. F Freeze protect the top ~100' of the well with diesel (IA and tubing).
4. O Set BPV, pull wellhouse and level pad.
I will add this to the pre rig schedule tommorrow. Please respond with any comments or questions. My
cell is 980-1439.
Greg
1 of 1 4/17/2007 1:37 PM
~ ~
o ~ ~ ~ ~
~ SARAH PAUN, GOVERNOR
1~T ~1 ~~St~r$1~~T ~~I ~-`D `V[~S 333 W. 7thAVENUE, SUITE 100
C01`S"~~IRQ~-ii~" C~~rII '~7'~~7"'I~~ ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Greg Hobbs
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 12-12A
BP Exploration (Alaska), Inc.
Permit No: 207-049
Surface Location: 1015' FSL, 751' FEL, SEC. 18, T10N, T15E, UM
Bottomhole Location: 443' FSL, 4147' FEL, SEC. 07, T1ON, R15E, UM
Dear Mr. Hobbs:
Enclosed is the approved application for permit to redrill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the A?aska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field inspector at (907)~59-3607 (pager).
DATED this ~ day of April, 2007
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ~ ~G ~
ALAS~IL AND GAS CONSERVATION COMMI~
PERMIT TO DRILL ~ ~ ~`
20 AAC 25.005
~ECEIVED
APR. 0 5 2007
1 a. Type of work
^ Drill ~ Redrili
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Devetopment Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ~ Development Oii ^ Single Zone 1 c. Speci I f~: Of1'1t111SS1Q
^ Coalbed MethaneA~~drates
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well
Bond No. 6194193 , 11. Well Name and Number:
PBU 12-12A -
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: _
MD 12639 TVD 8696 12. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay ~
4a. Location of Well (Governmental Section):
Surface:
1015' FSL
751' FEL
SEC
18
T10N
R15E
UM ~ 7. Property Designation:
ADL 028329 - Pool
,
,
,
,
,
.
Top of Productive Horizon:
164' FSL, 2525' FEL, SEC. 07, T10N, R15E, UM ~ 8. Land Use Permit: 13. Approximate Spud Date:
May 1, 2007
Total Depth:
443' FSL, 4147' FEL, SEC. 07, T10N, R15E, UM , 9. Acres in Property:
2560 . 14. Distance to Nearest Property:
17,750' -
4b. Location of Well (State Base Plane Coordinates):
Surface: x-696843 y-5931327 Zone-ASP4 10. KB Elevation Planned
(Height above GL): 63,8 feet 15. Distance to Nearest Well Within Pool:
685' ~
16. Deviated Wells: Kickoff Depth: 3500 feet
Maximum Hole An le: 101 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3200 Surface: 2338
48: Casin - Pro ram: S cifications To - Settin De th -8o ttom ' uanti ofCement c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta e data
N/A 7" 26# L-80 TCII 3350' Surface Surface 3350' 3343' Tieback: 64 sx Class'G'
8-1/2" 7" 26# L-80 BTC-M 7014' 3350' 3343' 10364' 8686' 717 sx Class 'G' 91 sx Class 'G'
6-1/8" 4-1/2" 12.6# L-80 IBT-M 2425' 1 214' 813 ' 1263 ' 6' ncemente Slotte Liner
99. PRESE NT WELL CONDITION S UMAAARY (To be completed far Redrill and Re-entry Qperations)
Total Depth MD (ft):
10870 Total Depth TVD (ft): Plugs (measured):
g47~ 9601 Effective Depth MD (ft):
10837 Effective Depth TVD (ft):
9446 Junk (measured):
~ooso~, ~oazr, ~oazs~
asing Length Size Cement Votume MD TVD
Conductor / Structural g0' 20" 300 sx P rmafrost 110' 110'
Surface 2664' 13-3/8" 2750 sx Fondu 400 sx Permafrost 2664' 2664'
Intermediate
Pr i n 9933' 9-5/8" 500 sx CI s'G' 9933' 87 8'
Liner 1251' 7" 300 sx Class'G' 9619' - 10870' 8502' - 9471'
Perforation Depth MD (ft): 9906' - 10162' Perforation Depth TVD (ft): 8737' - 8935'
20. Attachments ~ Filing Fee, $100 ^ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the re ing is true and correct. Contact Mehrdad Nadem, 564-5941
Printed Name Gre b Title Senior Drilling Engineer
Prepared By Name/Number:
'. ~' '° Terrie Hubble, 564-4628
Si nature Phone 564-4191 Date ~~.
. Commission Use Onl
Permit To Drill
Number:~0 D~ ~ API Number:
50-029-20610-01-00 Permit A roval See cover letter for
Date: otherre uirements
Conditions of Approva~: ~
If box is checked, well may not be used to explore fo~, test, or produce coalbed methane, gas hydrates, or gas contained shales:
3~~ ~a,'~ ~~.~~~. Samples Req'd: ^ Yes ~ No Mud Log Req'd: ^ Yes ~No
HZS Measures: ~Y ^ No irectional Survey Req'd: ~Yes ^ No
Other: ~`` ~~~~r~,.~sp~~-~c~~ac.a~~C~~~~~)`~ ~i~
APPROVED BY THE COMMISSION
Date - ~ ~ , COMMISSIONER
Form 10-401 Revised 12/2005 I~ ~ ~~ % ~ Submit In Duplicate
0~~~1~ v
~ ~
To: Tom Maunder, Senior Petroleum Engineer b
Alaska Oil & Gas Conservation Commission ~
From: Mehrdad Nadem, ODE
Date: Apri14, 2007
Re: 12-12A Sidetrack Permit to Drill
The 12-12A rotary sidetrack is scheduled to be drilled by Nabors 27E with an estimated spud
date of May 1, 2007. The sidetrack plan is to exit the 12-12 "main" wellbore from the 9-5/8"
casing at ~3,500' MD with an 8-1/2" BHA. The 8-1/2" hole will then be drilled to the top of the
Sag River formation at ~10,364' where a 7" drilling liner will be run and cemented. A 6-118"
production hole will then be drilled building to horizontal in the Sag~ River formation then
drilled horizontally for approximately ~1,840 to a final TD of 12,639' MD. A slotted 4-1/2"
production liner will be run from TD to 150' back into the 7" drilling liner. This well will be
completed with a 4-1/2" chrome completion.
Please note that the Operations Summary in this permit application differs from the version
provided in the Sundry Application. The previous Operations Summary included cut and pull of
the 9-5/8" casing. The plan presented below includes running a 7" tieback to surface.
Well Name: 12-12A
Planned Well Summarv
Horizontal Target
Well 12-12A Well Type Sidetrack Sag
Producer Objective
API Number: 50-029-20610-01
Current Status 12-12 is Shut-In
Estimated Start Date: May-1-2007 Time to Com lete: 32.38 Days
Surface Northin Eastin Offsets TRS
Location 5,931,327 696,843 1015' FSL / 751' FEL 10N, 15E, 18
Northin Eastin TVDss Offsets TRS
Target 5,935,708 694938 -8,704 164' FSL / 2525' FWL 10N, 15E, 7
Locations 5,935,909 694,209 -8,702 2725' FNL / 2280' FWL 10N, 15E, 7
5,935,941 693,735 -8,698 428' FSL / 1337' FWL 10N, 15E, 7
Bottom Northin Eastin TVDss Offsets TRS
Location 5,935,945 693,308 -8,696 443' FSL / 911' FWL 10N, 15E, 7
12-12A Permit to Drill Application Page 1
~
Planned KOP: 3500'MD / 3485'TVDss
~
Planned TD: 12,639'MD / 8,696' TVDss
Ri : Nabors 27E CBE: 40.88'
Directional Proqram
RTE: 63.8'
A roved Well lan: WP08 Exit oint: 3500' MD / 3485' TVD
Maximum Hole Inclination: ~55.370 (tangent sail angle).
~101.7 in the 6-1/8 horizontal section.
Major risk criteria fail for four wells. Wells 01-07A and 01-18 will be either
Proximity Issues: minor risked or surveyed with a gyro. Well 01-07 has been plugged back
and ma'or risk criteria fails for 12-12 ri ht outside the window.
Surve Pro ram: MWD Standard + IFR / Cassandra / MS
Nearest Well: 685' in TSGR to 12-19.
Nearest Property Line 17,750' to Unit Boundary
Geoloqical Proqnosis
Formation To s and Estimated Pore Press.
Formation
MD
TVDss Commercial
Hydrocarbon Bearing
( es/no)
( EMW / Psi)
SV4 -2676
SV2 3592.5 -3501
SV1 4033.44 -3900
UG4 4880.33 -4572
UG3 5036.04 -4694
UG1 5990.71 -5442
W S2 6667.15 -5972
WS1 6972.19 -6211
CM3 7309.13 -6475
CM2 7986.85 -7006
CM1 9152.15 -7904
THRZ 9538.74 -8146
BHRZ 9827.34 -8310
LCU 10008.6 -8413
TJB 10015.64 -8417
TSGR 10374.48 -8621 es 3200
TSHU 10422.7 -8646 es 3200
Casing/Tubing Program
Hole
Size Casing /
Tubin O.D. Wt/Ft Grade Conn. Length Top
MD / TVD Bottom
MD / TVD
N/A 7" Tieback 26# L-80 TCII 3,350' Surface 3,350'/3,343'
8-1/2" 7" 26# L-80 BTGM 7,014' 3,350' / 3,343' 10,364' / 8,686'
6-1/8" 41h"-Slotted 12.6# L-80 IBT-M 2,425' 10,214' / 8,130' 12,639' / 8,696'
Tubing 41h" 12.6# 13Cr-80 VamTop 10,214' Surface 10,214' / 8,130'
12-12A Permit to Drill Application Page 2
~
Mud Program
~
Hole Section / operation: 8-1/2" Intermediate Hole
Type: Fresh Water LS ND
Depth (ft) Density PV YP API FL
ml/30min MBT pH
Milling Fluid 9 15 - 22 30 - 40 6- 8 <20 9- 9.5
3,500'-9,350' 9- 9.5 8- 12 20 - 26 6- 8 <20 9- 9.5
9,350 - 10,364' 11.5 16 - 20 25 - 30 <6 <20 9- 9.5
Hole Section / operation: 6-1/8" Production Interval
Type: FloPro SF
Depth (ft) Density PV YP LSRV MBT pH
10,364,-12,639' 8.4 - 8.5 8- 15 24 - 30 >20,000 < 6 ppb 9- 9.5
Logging Program
9-5/8" Surface Casin : Sample Catchers - None
Drilling: N/A
Open Hole: N/A
Cased Hole: USIT/CBUCCL
8-1/2" Intermediate: Sample Catchers - None
Drilling: Dir/GR/Res/MWD/PWD
Open Hole: None
Cased Hole: None
6-1/8" Production: Sample Catchers - as required by Geology
Drilling: Dir/GR/Res/Stratasteer/Resistivit /Azimuthal Densit
Open Hole: None
Cased Hole: None
Cementing Program
Casin Strin : 7", 26#, L-80, BTC-M x TC-II Tieback
Slurry Design Basis: Lead slurry: None planned.
Tail slurry: 450' of the 9-5/8" X 7" annulus to 2,900' MD with 0°/a excess.
Pre-Flush 20 bbls of viscosified seawater
Freeze Prot 82 bbls of diesel
Fluids Sequence / Volume: S acer None lanned
Lead Slur None lanned
Tail Slur 13.2 bbls / 74 cf / 63.78 sxs Class `G', 15.8 ; 1.16 cf/sk.
12-12A Permit to Drill Application Page 3
~
~
Casin Strin : 7", 26#, L-80, BTC-M Intermediate Liner
Lead slurry: Remainder of 8-1/2" x 7" annulus with 40% excess, plus 150' of
9-5/8" X 7" liner lap.
Slurry Design Basis:
Tail slurry: 500' of 8-1/2" x 7" annulus with 40% excess, plus 80' of 7", 26#
shoe track.
Pre-Flush None Planned
Fluids Se
/ V
l S acer 20 bbls of 11.7 Mud PUSH
quence
ume:
o
Lead Slur 216.6 bbl / 1,218 ft / 716.64 sx Class G, 11.8 ; 1.70 ft /sk.
Tail Slur 19 bbls / 105.6 ft / 91 sx Class `G', 15.8 ; 1.16 ft /sk.
Casin Strin : 4-1/2", 12.6#, L-80 IBT-M Slotted Production Liner
Slurry Design Basis: Not Applicable
Pre-Flush N/A
Fluids Se
/ V
l S acer N/A
quence
ume:
o Lead Slur N/A
Tail Slur N/A
Casinq / Formation Inteqritv Testinq
Test Test Point Test Type Test pressure
9-5/8" Casing Prior to Mill Window
f/Whi stock De arture Casing Test
30 min recorded 3,500 psi surface
9-5/8" Window 20' beyond mid-window FIT 12.1 ppg EMW
7" Liner to Surface Landing collar to surface Casing Test
(30 min recorded) 3,500 psi surface
7" Tieback to surface Float Equipment to surface Casing test
(30 min recorded) 3,500 psi surface
7" Shoe 20' beyond shoe FIT 9.5 ppg EMW
12-12A Permit to Drill Application Page 4
~
Well Control
~
Well control equipment consisting of 5,OOOpsi working pressure pipe rams (2), blind/shear rams, and an
annular preventer will be installed and is capable of handling maximum potential surface pressures.
BOPE and drilling fluid system schematics are currently on file with the AOGCC.
Well Interval: 8~h" intermediate interval
Maximum antici ated BHP: 3,200 si at 8,621' TVD
Maximum surface ressure: 2,338 SI (based upon BHP and a full column of gas from TD ~ 0.10 psi/ft)
Calculated kick tolerance: Greater than 155 bbls with 11.5 pp EMW FIT
Planned BOPE test pressure: 250 psi low / 3,500 psi high - 7 day test cycle until a window is milled
in 9-5/8" casing. Once a window is milled a 14 day test cycle can
commence.
BOPE configuration for 7" BPXA requests for a variance to use variable Bore Rams rather than C/O
Lin r to 7" pipe rams while running the 7" liner. In the event of a kick the rig will
~ follow the current, best practice, making up a safety valve crossed over to
Q~~~`~` ~~';(~
` casing thread, then changing elevators and picking up a joint of drill pipe.
r
~ (~ ( This confi uration rovides two sets of em lo able rams, rather t
Planned BOPE function test B A requests a variance to the provisions of 20 A . 5(e)(10)C '
~
~ regar ~ g nction p test requirem after the use of BOP ram
~-E
C -`~~-~ type ent for other than we ntrol equivalent purposes, exceqt
~~~~~-
Q~~-~~~~,~~ w n the ro ine use of BOP equipme ay have compromised their
4 fectiveness. xample would be wh ' e rams are inadvertently ,
~ as
a~s `~~`~~ closed on a tool jo' during routine eration . The activities asso ~ ted
~ with this re uest will n ise the inte rit BOP ment.
Well Interval: 6-1/8" roduction liner section
Maximum antici ated BHP: 3,200 si at 8,621' TVD
Maximum surface ressure: 2,338 SI (based upon BHP and a full column of gas trom TD ~ 0.10 psi/ft)
Calculated kick tolerance: Infinite with 9.5 EMW FIT
Planned BOPE test ressure: 250psi low / 3,500 psi hi h
Planned com letion fluid: 8.4 seawater / 7.Opp Diesel
Planned BOPE test ressure: 250 si low / 3,500 si hi h-14 da test c cle. -~
Planned BOPE function test A requests a variance to the provisions of 20 AAC . 5(e)(10)C
regar th c ion pr re test requirement af the use of BOP ram
type eq ' t for other than control or eq ' alent purposes, except
when e routi use of BOP equip nt may ave compromised their
eff tiveness. ( ample would be whe ' e rams are inadvertently
sed on a tool join uring routine o tio The activities associ d
ith this re uest will not ' e the inte rit ent.
Faults
The planned trajectory intersects a fault in the intermediate section between ~10,050' -
~10,155' MD which corresponds to ~8,440 -~8,500' TVDss. The production hole will not
intersect any mapped fault in the Sag River reservoir section.
Fault Details
Formation Where Encounter Fault MD Intersect ftTVDSS Est. Throw UncertBint
12-12A_wp08 Intersects Fault 3 iin
Kin ak formation
~10050-10155
~8440- 8500
10ft S
+/- 30 ftTVDSS
12-12A Permit to Drill Application Page 5
~ ~
Although the planned trajectory does not penetrate any mapped faults in the reservoir section, there
is a potential for the well to penetrate faults which are below seismic resolution. It is unlikely that
the un-imaged faults to fully offset the Sag River formation.
Fault Coordinates for Ma in
X
Y Estimated fault
throw, ft
Fault 1- Not intersected b well lan 699733 5933473 100
Fault 2- Not intersected b well lan 698065 5934740 50
Fault 3- Intersected by 12-12A_wp07 10050- 696340 5935481 <= 10
10155 ftMD 696128 5935500 <- 10
Fault 4- Not intersected b well lan 696198 5936013 <= 10
Disposal
Annular Injection: No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations are to be hauled to the Grind and Inject
station at DS-04. Any metal cuttings should be sent to the North Slope Borough.
Fluid Handling: All drilling and completion fluids and other Class II wastes are to be hauled to DS-04
for injection. All Class I wastes are to be hauled to Pad 3 for disposal.
Hvdroqen Sulfide
#1 Closest SHL Well H2S Level
#2 Closest SHL Well H2S Level
#1 Closest BHL Well H25 Level
#2 Closest BHL Well H2S Level
Max. Recorded H2S on Pad/Facility
Other Relevant H2S Data
(H2S alarms from rigs, etc.)
12-13 10 3/24/2007
12-11 NA
13-02B 50 12/Ol/2006
12-17 50 12/O 1 /2006
DS 12 is a H2S site. Follow H2S SOP on the Pad and
nost H2S contin~encv olan in the doghouse.
12-12A Permit to Drill Application Page 6
~ ~
Pre-riq Operations
1. Replace all live gas lift valves with dummy gas lift valves, and fluid pack as necessary for coil tubing
P&A.
2. Pull the tubing tail plug set in the 2-7/8" `XN' nipple in the 9-5/8" X 5-1/2" Baker packer at 9,601' MD.
3. Drift the tubing to confirm and tag top of the fill. Top of fill is expected to be at 10,101' MD.
4. P&A the 12-12 well bore. Lay in ~26 bbls of 15.8 ppg cement, leaving top of cement in the 5-1/2"
tubing at ~9,260' MD. Cement volumes may have to be adjusted based on tagged bottom from step 3.
5. Pull gas lift valve number 8 and leave open a pocket. Circulate the annulus to 9.8 ppg brine, cap with
100' of diesel.
6. Jet cut the tubing at 3,800' MD with the appropriate jet cutter.
7. CMIT T x IA to 3,500 psi for 30 minutes. MIT OA to 2,000 psi for 30 minutes.
8. Bleed casing and annulus pressures to zero.
9. Function all tubing and casing lock down screws. Repair and replace as necessary. PPPOT-IC and
PPPOT-T
10. Set a BPV. Remove well house and flow line. Level the pad as necessary.
Operations Summarv
Rig Operations:
1. MI / RU Nabors rig 27E
2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater.
3. Pressure test CMIT TxIA to 3,500 psi and MIT-OA to 2,000 psi for 30 minutes, each.
4. Set TWC and test from below to 1,000 psi.
~ 5. Nipple down tree. Nipple up and test BOPE to 3,500 psi. Pull TWC.
~~~b 6. R/U. Pull 5~h" tubing from the cut at ~3,800' MD and above.
.,c1 7. R/U E-line. M/U 8-1/2" gauge ring / junk basket / casing collar locator (CCL). RIH and tag tubing
~~~
stump at ~3,800' MD. POOH.
8. On E-line, run USIT/CBL from surface to the tubing stump at 3,800' MD. Change USIT settings below
the 13-3/8" casing at 2,665' MD to corrosion mode.
9. On E-line, RIH with HES EZSV. Set bridge plug at ~3524', as required to avoid cutting a casing collar
while milling the window. POOH. R/D E-line.
10. Pressure-test the 9-5/8" casino to 3.500 nsi for 30 charted minutes.
-
11. P/U an IH with 9-5/8" Baker bottom-trip anchor whip stock assembly on 4" DP. Orient whipstock
per Sperry Rep, and set on bridge plug. Shear off of the whipstock.
12. Displace the well to 9.0 ppg LSND based milling fluid. Completely displace the well prior to beginning
milling operations.
13. Mill window in 9-5/8" casing at ± 3,500' MD, plus approximately 20' beyond middle of window.
~~`' Circulate well bore clean.
~~ 14. Pull up into 9 5/8" casing and conduct an FIT to 12.1 ppg EMW. POOH.
~~ 15. M/U 8'h" GR/RES/PWD/MWD assembly. RIH, kick off and drill the 8'h" intermediate section with 9.0-
9.5 ppg LSND.
16. At approximately 100' above the THRZ, Circulate the well bore clean, and run a wiper trip to window.
17. Run back in to THRZ and weight up the system to 11.5 ppg with spike fluid from the MI plant.
18. Drill ahead to the 7" liner point at top of the Sag River, as per the directional plan. Circulate well clean,
short trip to THRZ or higher as needed. POOH.
19. Run the 7", 26#, L-80, BTC-M liner to bottom on drill pipe. Circulate and condition the hole.
20. Cement the entire 7" liner through the 8-1/2" hole and back 150' into the 9-5/8" casing at 3,350' MD.
Set the hanger and packer, displace cement with mud.
21. Circulate bottom up, POOH, UD liner running tool (LRT).
22. MU & RIH with 3,350' of 7", 26#, L-80, TCII, liner tieback.
23. Sting in and establish seal, P/U to expose ports.
12-12A Permit to Drill Application Page 7
~ ~
24. Cement the tieback to 2,900' MD, bury the seal. The top of the 9-5/8" by 7" annulus will be freeze
protected with diesel to the surface.
25. ND BOP at top flange of the existing tubing spool and pick up the stack.
26. Install 7" slips with primary seals.
27. Cut the 7" casing per Cameron Rep, set BOP back.
28. Install Gray emergency pack off. Install tubing spool per Cameron rep.
29. Test casing hanger flange and pack-off seals to 80% of the casing collapse pressure or flange rating
(whichever is less).
30. NU and test BOP.
31. Pick up drill pipe and stand back.
32. Test casing and liner to 3,500 psi for 30 minutes. Record the test.
33. MU clean out assembly.
34. RIH to liner float equipment.
35. Drill out tieback float equipment.
36. RIH to drilling liner float equipment, test to 3,500 psi for 30 minutes, and record. Then drill out of
cement and float equipment to shoe.
37. Displace to 8.5 flo pro fluid.
38. POOH for directional drilling BHA.
39. M/U the first 6-%e" Dir/GR/Res assembly with an insert bit.
40. RIH, and drill out the 7" shoe plus ~20' new formation, pull up into the shoe and conduct an FIT to 9.5
ppg EMW.
41. 24 degree dog legs will be required below the 7" shoe to minimize the distance the wellbore is out of
the target Sag River formation.
42. Once the well is landed in the Sag River, POOH and PU the second 6-1/8" BHA with a PDC bit and
DIR/GR/Res/Azimuthal Density, and StrataSteer processing will also be utilized through this section.
43. Drill ahead per the approved directional plan to planned TD.
44. Circulate well bore clean, short trip to shoe, circulate. POOH.
45. Run a 4-1/2", 12.6#, L-80, IBT-M slotted production liner. POOH laying down drill pipe.
46. R/U and run a 4~h", 12.6#, 13Cr, VamTop tubing completion, stinging into the 4-1/2" liner tie back
sleeve.
47. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test.
48. Set a BPV.
49. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi.
50. Freeze protect the well to ~2,200' TVD. Secure the well.
51. Rig down and move off.
Post-Riq Operations:
1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer.
Install gas lift valves.
2. Install well house and instrumentation.
12-12A Permit to Drill Application Page 8
~
~
Drillinq Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Sag River reservoir in this block is expected to be under-pressured at 7.1 ppg EMW. This
pressure is estimated based on offset well pressures.
II. Lost Circulation/Breathing
A. Follow the LCM decision tree if the losses occur.
B. The planned trajectory for this well will intersect a fault in the intermediate hole approximately
315' above the Sag River formation casing point. The production hole does not intersect any
mapped faults in the reservoir section, however there is a potential for the well to penetrate faults
which are below seismic resolution. Un-imaged faults would be unlikely to fully offset the Sag
River formation.
I{I. Kick Tolerancellntegrity Testing
A. The Kick Tolerance for the intermediate hole section is 155 bbls with 11.5 ppg mud, 12.1 ppg
FIT. This FIT should prove up adequate formation strength for expected ECD's. Notify the ODE
and Drilling Manger if a 12.1 ppg FIT is not achieved at the window.
B. The Kick Tolerance for the production hole section is infinite with 8.5 ppg mud, 9.5 ppg FIT, and
an 7.1 ppg pore pressure. This FIT should prove up adequate formation strength for expected
ECD's.
IV. Integrity Testing
' Test Point Test Depth ' Test ` ` EMV~ ~It~lga~}
9-5/s" wlndoW 20-ft minimum from the 9 5/g" window ~' 12.1 minimum
7" shoe 20-ft minimum from the 7" shoe FTT 9.5 minimum
V. Stuck Pipe
A. Pipe sticking tendency is possible if the HRZ shale give problems. Back reaming at connections
and good hole cleaning practices will contribute to favorable hole conditions.
B. Monitor cuttings closely and adjust mud weight accordingly to avoid destabilization.
C. We do not expect stuck pipe if the hole is kept adequately clean.
VI. Hydrogen Sulfide /
A. DS12 is designated as an H2S site, however Standard Operating Procedures for H2S
precautions should be followed at all times. H2S levels across the pad are in the 10 PPM range
based on the last samples taken in 2005.
VII. Anti-Collision Issues
A. Major risk criteria fail for four wells. Wells 01-07A and 01-18 will be either minor risked or
surveyed with a gyro. Well 01-07 has been plugged back and major risk criteria fails for 12-12
right outside the window.
CONSULT THE DS 12 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL
INFORMATION
12-12A Permit to Drill Application Page 9
TREE = GRAY GEN 2
yVE1LHEAD = GRAY
ACTUATOR= AXElSON
KB. E1EV = 71'
BF. E1EV =
KOP = 3100'
Max Angle = 42 @ 10783'
Datum MD = 10078'
Datum ND = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347" 2664~
Minimum ID = 3.725" @ 10176'
XN NIPPLE
2,200` - 4-1/2" X Nipple (3.813" ID)
St MD TVD Size
5 3,001 3,000 4-1/2" x 1"
4 5,347 5,000 4-1/2" x 1"
3 6,931 6,250 4-1/2" x 1"
2 8,349 7,400 4-1/2" x 1"
1 9,616 8,500 4-1/2" x 1"
3,500` 9-5/8" X 7" BKR ZXP PKR/HGR
10,116` - 4-1/2" X Nipple (3.813" ID)
10,136` - 7" X 4-1/2" BKR S3 Packer
10,156` - 4-1/2" X Nipple (3.813" ID)
10,176` 4-1/2" XN nipple (3.725" ID)
~ 10,196' - 4-1/2" WLEG
10,346` - 7", 26#, L-80 liner
9-5/8" CSG, 47#, L-80, ID = 8.681" 9933~
PERFORATION SUMMARY
REF LOG: BHCS ON 07/20/81
A NGLE AT TOP PERF: 38 @ 9906'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 9906 - 9926 O 06/15/98
2-7/8" 6 10031 - 10035 O 06/15/98
2-7/8" 6 10038 - 10041 O 06/15/98
3-1/8" 4 10041-10059 O 07/14/86
3-3/8" 4 10041 - 10059 O 12/03/90
3-1/8" 4 10064 - 10077 O 07/14/86
3-3l8" 4 10064 - 10077 O 12/03/90
3-3/8" 4 10084 - 10100 O 12/03/90
3-1/8" 4 10084 - 10162 O 02/13/84
8 10178 - 10218 S 11/15/90
8 10230 - 10250 S 11/15/90
3-3/8" 4 10358 - 10360 S 11/15/90
PsT~ 10837'
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10870~
~
. ,
'.a
w. .
••
, *• .
m .
~.
. ~
a~
4-1/2", 12.6#, L-80, Slotted Liner- 12,633`
TOP OF 7" LNR 9619'
9651~ 4-1/2" TUBING TAIL
'I 0030~ FISH - PATCH RUBBF~Z & ElEN1ENTS
10821~ FISH- (7) FINGERS F/KIN
CALIPER 1/8"X5/16"X1"
10826' FISH - GLV
DATE REV BY COMMENTS DATE REV BY COMMQVTS
07/26/81 ORIGINAL COMPLETION 08/14/04 LDKlTLP SEf PACKER
10/26/01 RN/TP CORRECTIONS 03/06/05 KSB/T~H PKR XN NIPPLE CORRECT
02/06/03 ATD/TP DEIETE WANER SAFEfY NOT 04/01/05 MGS/TLH XN PLUG St~ (03/07/05)
10/26/03 CAO/TLP PULL PATCH @ 7926'
11/04/03 SVC/TLP CORRECT SQZ'd PERFS 11/90
~~~`~,:~;s~~'~r04 GJ~I ~ L!~ G! V GO
PRUDHOE BAY UNff
W~L: 12-12
PERMff No: ~1810830
API No: 50-029-20610-00
SEC 18, T10N, R15E, 3639.14' FEL & 1237.52' FNL
BP Fxploration (Alaska)
~ ~~-12 A SA~ NOTES: PATCH SET ACROSS HOLE IN TBG
Proposed Completion °~ 7939'. IA X OA COMMUNICATION TO AL GAS.
TR~ _ ~ GRAY G~ 2
WELLHEAD = GRAY
ACTUATOR = AX~SON
KB. ElEV = 71'
BF. E1EV =
KOP = 3100'
Max Angle = 42 @ 10783'
Datum MD = 10078'
Datum ND = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347"
~
Minimum ID = 2.25" @ 9601'
2-7/8" XN NIPPLE IN BKR PKR
~ 5-1/2" TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892" ~-~ 9588•
TOPOF4-1/2"TBG-PC 9588~
TOP OF 7" LNR 9619~
4-1 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 9651'
9-5l8" CSG, 47#, L-80, ID = 8.681" 9933~
PERFORATION SUMMARY
REF LOG: BHCS ON 07/20/81
ANGLE AT TOP PERF: 38 @ 9906'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 9906 - 9926 O 06/15/98
2-7/8" 6 10031 - 10035 O 06/15/98
2-7/8" 6 10038 - 10041 O 06/15/98
3-1/8" 4 10041 - 10059 O 07/14/86
3-3/8" 4 10041 - 10059 O 12/03/90
3-1/8" 4 10064 - 10077 O 07/14/86
3-3/8" 4 10064 - 10077 O 12/03/90
3-3/8" 4 10084 - 10100 O 12/03/90
3-1/8" 4 10084 - 10162 O 02/13/84
8 10178 - 10218 S 11/15/90
8 10230 - 10250 S 11/15/90
3-3/8" 4 10358 - 10360 S 11/15/90
~~ -~ 10837,
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10870~
1~-~~ SA~ NOTES: PATCH SET ACROSS HOLE IN TBG
@ 7939'. IA X OA COMMUNICATION TO AL GAS.
2195~ 5-1/2" CAM BAL-O SSSV NIP, ID = 4.56"
5-1/2" CAMCO DSSSV, ID = 3.025" (09/12/02j
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
1 2896 2896 4 CAMCO DOME RK 0 01/30/04
2 5095 4803 39 CAMCO OPQV RK 0 01/30/04
3 6806 6151 38 CAMCO S!O RK 24
4 7939 7059 35 CAMCA DMY RK 0
5 8636 7645 31 CAMCO DMY RK 0
6 8711 7710 31 CAMCA OPOV RK 0 01/30/04
7 9108 8056 28 CAMCA DMY RK 0
8 9182 8122 29 CA MCA DMY RK 0
9 9412 8323 28 CAMCO DMY RK 0
10 9487 8389 30 CAMCO OPEN RK 0 01/30/04
9{ 558' I-~5-1/2" BOTPBRASSY +
9578~ 9-5/8" X 5-1/2" BOT PKR
g588~ 5-1/2" X 4-1/2" XO
9601~ TOP OF 4-1/2" BKR KB BTM PKR (08/14/04)
w/2-7/8" XN NIP, ID = 2.25" PLUG SET (03/07/OS)
J648~ 4-1/2" CAM DB LANDING NIP, ID = 3.81"
9650~ 4-1/2" BOT BULLNOSE SHEAROUT SUB
9~~ 4-1/2" TUBING TAIL
10030~ I-~ FISH - PATCH RUBBER & EIEJNENTS
10821' I FISH -(7) FINGERS F/KIN
CALIPER 1/8"X5/16"X1"
10826~ FISH - GLV
DATE REV BY CAMMENTS DATE REV BY COMMENTS
07/26/81 ORIGINAL COM PLETION 08/14/04 LDK/TLP SET PACKER
10/26/01 RN/TP CARRECTIONS 03/06/05 KSB/TLH PKR XN NIPPLE CARRECT
02/06/03 ATD/TP DELETE WANER SAFEfY NOT 04/01/05 MGS/TLH XN PLUG SET (03/07/05)
10/26/03 CAO/TLP PULL PATCH @ 7926'
11l04/03 SVC/TLP CORRECT SQZ'd PERFS 11/90
01/30/04 GJB/TLP GLV GO
PRUDHOE BAY UNff
WELL: 12-12
PERMff No: ~1810830
API No: 50-029-20610-00
SEC 18, T10N, R15E, 3639.14' FEL & 1237.52' FNL
BP Exploration (Alaska)
en
~n c
F- F- F
~
G < !
- - -
S
' ~
~-'
- - -
<
~~
c
= u
v -~zoion~ni~a~a-o -oo ~ r.~n.•;o
'^=oa.^.~~na•t~n~ooav,.v'~i~~t~a~n
? ~ o a =:=.
>..
G
L
~LL ~
> o~ ~b.^~-~c~naror'~i."-'~,~-".cxxo~'
-
°' V1
L
`L __ ' ,~~` ~.~~r~~.',?v~~~C~•fvi~n~TT~K
------~~~~~~~,~~~~...M
~ - '/1 ~
r
z
S
3
' ~ '~?`
r
f~ r,
f1l M~%,i ~
~ V
u =~R=-v~CV~-~.=v~,~0 :~a~o=??~
~... ~~ vi t^, ^. x~ ^. M ~"f f~ ~~-~ t~l ~ ~
N ~
~
_ Tr
~T
~
a~
a
v
~
~ 4.
F' w.=~GM~.. l .. ~I~svT~~ ~T
(\1`
~ J .
,
.
. ~ ~ ~
- ~`
~ ~4 O~~ ^.~^... ~..?~O^~~ ~»~~
^
~~~
~
~^
~~
~~=~0 ~'
7 ~~O
^
~
e. .. ~ Z :li ~ : ^J7` ~~n
= ~.:.^.~ ~ : ~l
~ .`
.
.
.
.`
.
..
~hl?.^.~C.^.~.^.Y~~~C7~f ~ R?7
~ ~~
m v
~ y
v _
~ t RVl-'S-JG
R~~ T ~
`~
r
~
v
T
n
n
sy ~ - v
~~
v
v
i
i
i
N Z ,. ~.-,. ,!
~n 3
~
- znonriara-o~o»x~nnn~o
`~O~PONt~TR~nzOT~n~nt~T~Th
U U C -
~ ~ v~'i~?v~'i r`vai
~ . ~ ~ ~ W 'a-vv,-rixa~n-oz~o~n.~c~cor~
oo~nooo-~o~ct~a~•fr~i~-.oxza-
_
5 z F.
Lt] + rv~oaam.~nv~n~co~r~n~naaoc
~
~~INNrI[^
.
'
~ ~
0 3 T~
~~°~
Q ~ ' ~~~
~ i
._
a ,
x~„~~.,_~
J ~ ~O .--• ~O ~ Yi 'T z
O
~
J I3
J + _~~„T~Ir7+,
~ V1
F ~ ~ t~l N Vi ~O ~O P
1~ ~? M O~: O~ v~ O~C N~~O rv
~~~0?~=Rr~~GCV~n~~Sn'T~Ot~IN~~r~~
s ,
< ~ ~ ~ ~ ~ ~ ~ + ~D T r+1 V~ ~n rl t~ ~9' !~ v: ~0 ..^. rl ~C rl r1 K Q V~ ?
-rv~ri~~-~~M,~~~n~,xaTaaao
_ -
- F- m n~roov,o
I.l,..~y ~n ,-,~, - - ~ina~c.~~c.;~c~c~r
~ ~+1~?O'SKRK~fO?`f YRY
~ Z -r.^'-r- -
~ r. + Y't-tlSetY Q ~~~rir r+~.v~. l~~: v^ :-- : rY _ _
~!
a i
~ F ~RY~v~.r.! :~IV:~ ^. -
xri~nx~..:~:,r~~tri~iri-~c~xr.;
a
~? - -
~~
j -~ ` = _
M.~-'~-t~xx`" rzsbz
~xxx~~ xx>
~
8 ~
-' ~ ^ 'ri
~
zaao~- _
- ~~~~~~
oox»oo.~o
.'
~
~~~o~.:;oaaoooo~c.:or~
M
ao--o~-
- __
,
,...
=oo - - riri
'
C -
Z - y ~
11 `f~l .~ aov~nn~i~inFi~inn~~i
i ~nrn
IMN1Mr1MM~'ir~',r1MMhIhIhIClhINNn1
Y ^y' VI .f r1 fl p-~
FFF-FGF-
_
v~i~ir~NO~rooCOO~r~o--
v-r~nnqc~rc--o~n~.,~iN~~
d
t ~ «G«<
n~~ri~i~i~~ '°a~a-,'r„°,~~~~,~ooooo000000
--
ooaaaaaaaaa
> 5
~
_~ E - ---
a _, r,
Z ---- -
~ ,
oo~,~oa~^ar,~v~,Nanri~o.rwa~co
~
~
T ~
~ ~--ocvxzzo-.-,o~nv,Y
oorz,.
~o~nz~cav~~~z~ra~vi~~nz~-'.~cn
i
~
i 9
. s ~v~~oora~o~~~~~ir~~
~coM,n,
~
na~~caao ooo---- i~v~i
~-~----~--"---
o ;
{.
L
~/. _
VI n7~n~crzao
-Nr~1RVi.Crx.^. ~~~~ ~ ~
~ '
%~ ~. . . . . . . .
~ -
~~ :
~~y~
? _Fi~g
F~ -
Z 3=if_~
i l~i''a
qL tG ~.E
_ G1~-~<
Z> _;i ;
3____
~F~~
c
?
N " N
~ + vn-ri-.~~~'~aC~ Z ~
F ri ~~~33~~~1=-mJF=FmF - ,
u~
a .~ '~°~i~^„~ooooorir~~r~ ri .. : '
o;.q~.o~~~~o
O a d.dda~+ic~rir~i~ri.o.o.oo~~
F" ~ ~oa~P.`~-,~a='a~cca~r,
Z ~ ~~.~,~n.c.o~~caca+rncoo ~~
O ---
¢ t vvo.o-o~~nc~ca~i~irino - --
M-~7't~p~nviOrnfn ~OJG oOJOr~O
~ 1 ~rlviQ~ v`~i~~0 C ~n~r^~r~OJ~O _ _
~ ~ ~r~~,o~~~~oa-.nva~~~~o
J > v7~n.o~o~o~roo~cxooxxx -
.,. ~
O .-. N r.~~ 7 v'~ -_--_
Z ~rlr'17~~ ~Dt~ooO~~---~-
~ ~
U ~ ~
~ N
~ r7
~ \~
z ~Q
N ^
v :j
R~1
Q ~ M..
;.
.~ y -
~ ~ I
~ b ~ ~
ti
O ~
~Z - N
~ _
~ ~
r
n
0
~
~
~ ~
a
9 ~ Ly
5 ~~i
- ;~VT~e
- ~ ft__~
i
i ~ 13~.'+~
~ ~n'i~i
3E7e-E
~ N 3
2
~
~
[uliU0001] 4tda4 ~a~iuan an~,~
c
d ~ Jl ~.
G G c C TC
s O O O O O O
~ _ ~n aaaaaa
- - an ooono~n
0 0 ~ ' ?b~.;a_-
3 ~ ~OOr~Ot~M
LL] M M 1~ 1 n1 T
rl ~ ~n T T a a a T
J v^ ~D ~O ~O ~D ~O
~ - :i oooao~r
^ _ ~ i P q~oooc
- ~ z v~,-a-x
r ~ ~ ~ z
' ~~~~b~
- ,_ ~
~y N ~~~~~~
m <
~ ~ ~ro.~,zco
~ ~ - ~ ~ 0 3 a~nn~n~~o
u ~ ~ "' F zn,on-o
`~ ~-~o-via
~ ut + cav,er
s J~ _ , n~i.^-
< n ,
~~`- _ F v~ z.~'nN~n~
z - Z va-io.:o
' + ~oa~nvin
r~o~:~v
va7aav
3
' ~ ~~°_^:i~
~ .o~oz~iM~o
ooarnooo
~~o.orrr
~ i ~omzxwz
_ 5
't
~ ~ ~ T~
(nRMf17~
FFFFaF-
- ~ «<Q<
X Z ~l~I~~I~1N
0
- - t ~ ov, ~ Y :7 ai
_ , ~ ~ r.~-rv-r.r~-~z~ Z. p
'. `~ `r :7UJNN~~~22'v=Ymcn
'~ ',, ~ [x. '~77~33U~JCJF~IJFFFF
I I a s ~o-~n-v,caoo~irrrr~trv
n .r~a~o-a.o~.o~c~~~o
i,
~~~. C~ c o~aa~io~niri~ri~c~c~cd-t
~ .__I ~.1,- _ ~ ! ~'. F' p z`na~a~~a='e~aaa~n
I . . ~,. . . ~', , j ~ ~ ev~~n.; .~n~aaTO,.aaoo
. . ~. , . ~~ ~~ I-~- c , ~ s ~vo~c-a~,a~oar~ri~.~r~o
. . _ _ . . . , . ~ - r~ -- --tr~nvionr,~cocxx^o
. ~ ~ Z i~? 2' L ~r~ I~R^._~__~- ~
~ 1~ Q Rvi-v~T~n~.,:T~nr~r'.n~~0
J /` ~ ?~SVNi~D~OvN^.rr.~O~AS~aNOa~O
. . . . . . . . . z o 3 `.a' F
~- . . ~ . . ~ c ri ~
, ~ _ . ' 'v ~ ^ _~i o-nM,7~n
_ ~, ~ oN I ,-,-tv,oc~za----__
i . ~
,
~. ~M
, ~~
~ o bT
. . . F xb . . . . . . .
i:
_'. _. . . ._ . . . __ _ . ..
~ z
I I i. i Z -N
T
~~
Y ~
Y !
~ L
~
_ 3
! y - «
. _~ .
Q
_-~ _
i^I .
. . ._- __.-_
~ . .
" ... . .
. ~ . . . . . . Q
. . _
' ~ '
. .~. .. . ~
. VI . . ~ _
~ . ' . `'
. . .. .
. ~ . . . .Q.
. . q . . . . ~
~
__.__._ '._-_ . .
~
.~
. . .
_ ' ___ -__.
~N . . _ -__. .
. . .
.
.
-~, i
c _
3
,_ T
.
~
_
~ - Vi
. .'S .
. . . . . . . ^
.._ -_
. . . . . I~
. In . . . . . . _.
O
. . _"-
...
I
. ~ .
9 .
_...._ . . . . ..
. __. . . . __
_ _ _ . - ~ , ~ ...
. : . . . . . Vl.
`_ ~ .t _.'-~_~__ -
_
~
I
I
..___._- ..__._ .
. .
__ __ _
. .
I O
. . ..
.._. .
'-- -_- _
.
__ .
V1
~ ~.
._. ~
.
_
~j.
af
. . ~'
~
~
a
- _ . . .. .. . . . .
Q . .r
~ -. . .._ . . . _- „
~
-
~ ~
... .
. .~ .
~ . . . _ _ __
O
~o I
~ 1'
n
~ '
'" . . . .F
' ~
"
C '. --__ ~ , , , I
. . J
.-
_
_ .
..
_ ~
._. r•, n
. .. .~ . _
_
.
... _.__
_
.
.
_ __
p__
~ , ~
'' I
'
, _
-
_ ~
-. .-~
~
'
-" . .~,~. ~
~ p - _
_
. ~0 I _
l
~0 W
h ;
~ O
- _ _-__'
... .__ ' T
_---_-. Q.
.
.? .
. . . ...
b Q Q
..
_ _
~
_
. _ _. ...
.
. . _ -
_ ~
~
_ . .... . C
z
- _ . . .
.~. ~ . .
._
_
'
_ _ _ ~
.
. _
~
_
~ . .
~
z . _ . . . ~ ~
~ .
M . _ _
w
o . o _
~ ~
~ .
.--_-
~~ :
~ . .
_,
~
^ . . . . ~
m .
. . .
,c
~
~
vi . . .
.
.
. . - . .
'
I ..n
~
~
s-..
~ .y . .. . ..
O~ . .
.
.._..___
~ __
_
I .
'
'
'
!
.
~
?
="~ . . . ) .
F~ .
~. _. . .
M
~ '-___. .
..__
,--t- _ __
__ F F
_
z6
T~
- ~.~°
.," . _ .
. _ M1 ...._
.
. :
o:_ .~
~
`- . . .
. . .
. ..
` _
_ < < <
` ~ i ~
_
e ~ _
x .,~-.,.~~- ~
- ~ ~r ~~ 3 ~
. .
.
l : ? .
.
~
. ..
x
_
t~
.
N
_
. _ _ ~
~~~ ~I
' - - - =
._ _ _ .. . .
a „ ~
.
~ . . . ._
~ _ ' _. __ _ __ _' -_ __ - i __
_ F- -
i SxiY` N
`.N
.~' ...
C_ . _.~ ~ ~
~ ~C~G ,+'e^~
a
U
r _ r _ -
Z S<i2~
... s
- -r,
-.. ..
.
_
~ =_
~
C~.
. A
~
._.
""'
U ~ .~ .+ .-. .~ .-.
i~G~'J ~nv~.r'ft~TV?
..xT.~t~It~~RV
+~
~
'
'
'
'
^
^
: G ~ C ~
i
~
.
~
.
.
~
0
. .
. .
N
C
_
.
~
r
_
~
_
>
~
N
.
,T-OVI-NY
SVt-^~O~G~It
..M
Jv
.
Vl y^~~C. ~:l~.~i I~at(`!r.-S.J0~0?~
Vl J'
^
~
^'lv~ T rl
a
v
a
=
Y . _ ..
.~
. . ~ . .
.
~ : .
. . . . .
, . . .
. .
. r
t
t O
~ ~ ~ ~ ~ ~ t~l
f~l ~ N
~ l
`1 rV"1 t
~t
Z '< ~ ~
H ~ ~ I I ~ ^.
~
~ ~
]
`r . .
.
N Q . . _..
_ .
~ ,
_
. F~ ~ ,
~ .
~ .
' .
.
' ~
r
. .
,
~
~
r~
O~M
~~~N~j
~~~=
~ G ' ~ ' ~
c9 . '
~
. "
'
_ .
.
~
- I . i
I
I~
.
_
. ~. .
_
O . . i
.
~
Jv~
~C
~
o ^ c ~c T C ~i ~ri O 'u O O
z O
F O ~ ~ o
y
~.~ `
^ Q N
~ ` . . . ~ .
.
I
~
l
; ~
~
.
.. . ~
~
T~ J' T
_ ~~ _
. .~ .
. . T=._
. . . . . .
._ . .__"_- .. _..
N
> - ' ' ~, ~ I I..
l . . .
. _
_
. . , , , , `Jl -^~~.^..7.~. ~~^..^y.^r^~ _~ ~^.~~.~.»
^. ."'i ~ ~ .'J .^J ~ .'~ .^J
. .'J .~. .'
. .~
.
. .
? i '
:' .~
^
'
c
,%j .
. _ . .
~
. . - - --
__ ----
h•
~ ~ - - ,
-"~ -
------_ . -
.
__.-
. _
~. ~~. ~ I ~, ~
~~
_.. . .~
~
.
.
~
.
~
.
.
.
p or~vo~i~rcaoYCCOO-radc-ro
- - -
~ °~ ~
~ I .r~ .__'_'_._
y _ o, . . . ~_ ~ . .
-- rn -r~ ~on~~Kra-^'c~wv'~i~r.-~ro
-~ 3 ooa :~~~a-r~,x3-, .r~a~
r'
~'
§ zq
rd --. -----
- __ . _ ~
. . - ' _ _ .
= . . . .
r
~
' zr.ri^ ^o~
a -r~n-nxavi-^
ua
< o : o-~c.:rar`c~i.~-~;~ox-r-
J ~ .~..~ , .
~ ~~
- ~ + .-_ i~aan.~.~,c~_ocN~aao-r
--_--- ~i~i ~i,.,..
- ~<
~ .~_
s -`_
~-- --
. __ - ~
-- . _---
. _ ^ ~ ~ ~ ~ ~ ~ ~ ~
,
~ ~ _~
. L_
~ ~ ~
K
. .
_ ~
' ~ ~
' ~ '
. '
_
I'
..-- . Z
D N : a0 r+~ N hl ~n .D JG T
~J VI 1~ ~(> T ~"'
~ 'V T ~n O
F~.~ . .-.--
Z
ey '
_ .
_
N ' I ~ .
~
^' ~ ~~m.~. O?M~O~~nM~RMT~Orlrlrln
F . . . . . .
~
~ ~'~z ~ ~, . . ~ _ .
i ~ . . ._
I . y~j Z Q~M~i~on~=rvn~~cnv~»aaaaa~
~ ~f~ni
~
e . ~
- , ~ .
l -
. . ~ ~M ___ i.~<t.~~.o~o.o~c,c~
r~n~RR~R~RCR~aTYK
~ ~~
~
~~~~~ . . _
. . ._ ' ' .. . ' _ .
_
S _ . . . .
N
~p
y _ . . _ . .-_ -._ i '
_..
-_ - z ~,
'~`~
f~1~Orlv~~.t~~.~0."..--~ T=~ J
Q ~
'" .
.
..~_ _
c F' " _
.
~
~
.
__ . _
t~~fxl~~ni^1.^~~fv~T=rl,-...1~=.^r
oa ^r.c..,.i,-;~i~i_,c .~
.-„~-
,~-
~ rM
°
. . .
+ -~~
ri _...
, ~ ~ ~
. ,
.
,
, pv~.oxa~ cmM,-oooo^aaa..
r-- .^..~~~rr~~~~:.
~ .___
_
-- ~ ~ -t - --
- -
- ~i
. ~. , i
-' ~~
, ,-t~xoc or.oczmocxxxxxxr_x
-
r _
~
- i .,
.
~ ,
. '
_
t. ' ' ' _ , . ~ ~ ,
: ~ ~ ~ ,
.. .~ •t~r-to~.:ooaaoooo~:~o~~
r
o--
a
_ .
~ .... , i , , . . . ~
nooe~nooooqo
~--o
e+1~~~~
~rrr'1~
~NN
N
~
_ . . . . . .- ~ ~ .
I , r1
NhI
I~I~I~
l
T = h ~
N~'1MMtf~r'1MMr"~Mr1r~~^INi^INN~`I~`It'1
~ . i I
.-
~
.
.
. ~ ~
__'. -. ~
_. ~ ~. ~ ~
_._ .. . .
.
'._ ~
~:._
~_
._.
._
, .
._. ,.
. .
_ . .
~.
.
.
. . U ^Jhlrll~l'~t~1~0=.^~COt~t~O.__1~1~1~
_ h1Y•l~Mr'~~^,~nl~~.--.~OV~vlfll~lf~l
. . .
~ .
~ . . . . . .
.
. .
.
. . ~Te~+i~v~iv~iv~iv~iv~ni~~~^.`^.`^.~~~ ~.^.G
-- n ~T?~.."~.?~?~TTTT
~ ~~v~J'R~OTNi^lr1~^Id'e+~~i-1'J~~OR~OO
~ ".~"~?i0r+1--'J"JS~C'~O~G.'..- ~'JMV1?
-
-
T
~
vt e
~
-
~
n ~
T
~
~
^ 1
M f
[w-t.1006~ (+)4u°
~
~
~
`1
N/(-)4
o
~
-
S
~
C
J ....=v~iSbTVl~~a'JSr~.-1~lYeT+' b^ ~~~r'~~1
I~YSM~'1~nv~~DZ~i~Ort~rir~N~D
~ ~ ~ ~ _ _
r~1rn?~OTTO~O ^. INN
~~~~_~~~~~~~~~
n ~1' ~f~ v^ JG 'J~ '..J
i~ - n ,., 7,n ~ ~ x. .. - - - - - - - - - - ~i
~ rr - n ~
Spe y Su
BP Planning Report
Company: BP Amoco Date: 3l1/2007 Time: 09:05:54 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 12-12, True North
Site: PB DS 12 Vertical (TVD) Reference: 18 : 12 7/2/1981 00:00 7 1 A
Well; 12-12 Section (VS) Refereace: Weil (O,OON,O.OOE,270.OOAzi)
Wellpath: Plan 12-12A Survey Calculation Method: Minimum Curvature Db: Oracle
Plan: 12-12A wp08 Date Composed: 2/8/2006
Version: 42
Principal: Yes Tied-to: From: Definitive Path
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: W ell Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006
Site: PB DS 12
TR-10-15
UNITED STATES : North Slope
Site Position: Northing: 5932650.90 ft Latitude: 70 13 12.462 N
From: Map Easting: 697966.79 ft Longitude: 148 24 9.888 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.50 deg
Well: 12-12 Slot Name: 12
12-12
Well Position: +N/-S -1294.56 ft Northing: 5931326.48 ft Latitude: 70 12 59.729 N
+E/-W -1158.26 ft Easting : 696842.95 ft Longitude: 148 24 43.518 W
Position Uncertainty: 0.00 ft
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
10364.02 8686.00 7.000 8.500 7"
12633.00 8696.03 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
4880.76 4643.34 UG4 0.00 0.00
5036.21 4765.14 UG3 0.00 0.00
5989.95 5512.40 UG1 0.00 0.00
6679.61 6052.76 WS2 0.00 0.00
6983.05 6290.51 WS1 0.00 0.00
7320.10 6554.59 CM3 0.00 0.00
7977.98 7070.05 CM2 0.00 0.00
9132.60 7961.39 CM1 0.00 0.00
9493.62 8191.36 THRZ 0.00 0.00
9775.67 8351.64 BHRZ 0.00 0.00
9916.77 8431.82 LCU 0.00 0.00
9916.77 8431.82 TJH 0.00 0.00
9916.77 8431.82 TKNG 0.00 0.00
10049.64 8507.32 TJB 0.00 0.00
10364.02 8686.00 TSGR 0.00 0.00
0.00 TSHA 0.00 0.00
0.00 TSHU 0.00 0.00
0.00 TSHB 0.00 0.00
0.00 TSHC 0.00 0.00
0.00 TSAD 0.00 0.00
0.00 47SB 0.00 0.00
0.00 46S6 0.00 0.00
0.00 45SB 0.00 0.00
0.00 44SB 0.00 0.00
0.00 43SB 0.00 0.00
0.00 42SB 0.00 0.00
0.00 41SB 0.00 0.00
0.00 33SB 0.00 0.00
0.00 TCGL 0.00 0.00
0.00 32S6 0.00 0.00
0.00 HOT 0.00 0.00
0.00 31SB 0.00 0.00
~ ~
Sperry-Sun
BP Planning Report
Company: BP Amoco Date: 3!1/2007 'ISme: 09:05:54 Page: 2
Field: Prudhce Bay Co-ordinate(NE) Referencec Well: 12-12, True North
Site: PB DS 12 Vertical (1'VD) Reference: 18 : 127/2l1981 00:00 7 1.0
Well: 12-12 Section (VS) Referen ces Well (O.OON,O.OOE,270.OOAzi )
Wellpath: Plan 12-12A Survey Calculahon Method: Minimum Curvature Db: Oracle
Formations
MD TVD Formations Litholog
y Dip Angle Dip Direction
ft ft , a~ d~
o.oo owc o.oo o.oo
0.00 BCGL 0.00 0.00
0.00 23S6 0.00 0.00
0.00 22TS 0.00 0.00
0.00 21TS 0.00 0.00
0.00 TZ1 B 0.00 0.00
0.00 TDF 0.00 0.00
0.00 BSAD 0.00 0.00
Targets
Map Map <--- Latitude -a <- Longitude ->
Name DescripNon TVD +N/-S +E/-W Northing Easting Deg Mio Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
12-12A TSag 8686.00 4124.85 -1368.94 5935414.00 695367.00 70 13 40.296 N 148 25 23.286 W
12-12A T4 8696.00 4709.39 -3413.50 5935945.00 693308.00 70 13 46.038 N 148 26 22.691 W
12-12A T3 8698.00 4694.26 -2986.73 5935949.00 693735.00 70 13 45.891 N 148 26 10.291 W
12-12A T2 rev 8702.00 4650.00 -2513.58 5935909.09 694209.12 70 13 45.458 N 148 25 56.544 W
12-12A Poly2 8703.52 4656.35 -3451.20 5935891.00 693271.70 70 13 45.517 N 148 26 23.785 W
-Polygon 1 8703.52 5445.12 -3506.96 5936678.00 693195.40 70 13 53.274 N 148 26 25.416 W
-Polygon 2 8703.52 4227.69 -3547.52 5935460.00 693186.60 70 13 41.300 N 148 26 26.578 W
-Polygon 3 8703.52 4165.56 -2852.96 5935416.00 693882.50 70 13 40.692 N 148 26 6.399 W
-Polygon 4 8703.52 4298.94 -2597.08 5935556.00 694134.80 70 13 42.005 N 148 25 58.967 W
-Polygon 5 8703.52 4256.14 -2337.10 5935520.00 694395.80 70 13 41.585 N 148 25 51.414 W
-Polygon 6 8703.52 4064.44 -1967.95 5935338.00 694769.80 70 13 39.700 N 148 25 40.688 W
-Polygon 7 8703.52 3968.32 -1274.38 5935260.00 695465.60 70 13 38.756 N 148 25 20.539 W
-Polygon 8 8703.52 4107.88 -948.71 5935408.00 695787.50 70 13 40.130 N 148 25 11.078 W
-Polygon 9 8703.52 4094.35 -775.10 5935399.00 695961.40 70 13 39.997 N 148 25 6.035 W
-Polygon 10 8703.52 4221.46 -623.82 5935530.00 696109.30 70 13 41.247 N 148 25 1.640 W
-Polygon 11 8703.52 4188.11 -381.00 5935503.00 696352.90 70 13 40.919 N 148 24 54.586 W
-Polygon 12 8703.52 3709.77 276.59 5935042.00 697022.70 70 13 36.215 N 148 24 35.483 W
-Polygon 13 8703.52 3353.33 1285.40 5934712.00 698040.40 70 13 32.708 N 148 24 6.179 W
-Polygon 14 8703.52 4083.27 1643.77 5935451.00 698379.60 70 13 39.886 N 148 23 55.765 W
-Polygon 15 8703.52 4604.10 47.52 5935930.00 696770.40 70 13 45.010 N 148 24 42.137 W
-Polygon 16 8703.52 4679.06 -524.85 5935990.00 696196.30 70 13 45.747 N 148 24 58.766 W
-Polygon 17 8703.52 4604.25 -648.55 5935912.00 696074.60 70 13 45.012 N 148 25 2.360 W
-Polygon 18 8703.52 4489.55 -930.05 5935790.00 69579620 70 13 43.883 N 148 25 10.538 W
-Polygon 19 8703.52 4438.64 -1279.52 5935730.00 695448.20 70 13 43.382 N 148 25 20.690 W
-Polygon 20 8703.52 4741.57 -1924.18 5936016.00 694795.90 70 13 46.360 N 148 25 39.421 W
-Polygon 29 8703.52 4970.00 -2013.95 5936242.00 694700.20 70 13 48.606 N 148 25 42.031 W
-Polygon 22 8703.52 5140.49 -2183.58 5936408.00 694526.20 70 13 50.283 N 148 25 46.961 W
-Polygon 23 8703.52 5399.84 -2768.45 5936652.00 693934.80 70 13 52.832 N 148 26 3.957 W
-Polygon 24 8703.52 5480.32 -2862.08 5936730.00 693839.10 70 13 53.623 N 148 26 6.679 W
-Polygon 25 8703.52 5445.12 -3506.96 5936678.00 693195.40 70 13 53.274 N 148 26 25.416 W
12-12A T1 rev 8704.00 4430.00 -1790.00 5935708.05 694938.15 70 13 43.296 N 148 25 35.521 W
Plan SecHon Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100k deg/100ft deg/100ft deg
3500.00 18.50 293.95 3484.79 46.17 -103.31 0.00 0. 00 0.00 0.00
3520.00 19.22 301.04 3503.71 49.16 -109.03 12.00 3. 59 35.45 76.00
4255.45 38.42 351.14 4153.41 343.84 -251.08 4.00 2. 61 6.81 76.04
8786.86 38.42 351.14 7703.82 3125.93 -684.92 0.00 0. 00 0.00 0.00
9480.34 55.00 320.00 8183.78 3565.00 -905.00 4.00 2. 39 -4.49 -65.51
9492.16 55.37 320.36 8190.53 3572.46 -911.22 4.00 3. 14 3.02 38.36
10352.19 55.37 320.36 8679.25 4117.39 -1362.72 0.00 0. 00 0.00 0.00
10364.02 55.00 320.00 8686.00 4124.85 -1368.94 4.00 -3. 14 -3.02 -141.85 12-12A TSag
' ~ ~
Sperry-Sun
BP Planning Report
Company: BP Amoco Date: 3/1/200T Timec 09:05:54 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell: 12-12, True North
Site: PB DS 12 Verticai (TVD) Reference: 18 : 12 7/2/1981 00:00 71 A
We1L• 12-12 Section (VS) Reference: W ell (O.OON,O.OOE,270.OOAzi)
Weilpath: Plan 12-12A Survey Calculahon Method: Minimum Curvature Db: Oracle
Plan Section Information
MD
ft Incl
deg Azim
deg TVD
ft +N/-S
ft +E!-W
ft DLS Build
deg/100ft deg/100ft Turn
deg/100ft TFO Target
deg
10384.02 55.00 320. 00 8697.47 4137.40 -1379.47 0.00 0.00 0.00 0.00
10574.43 100.70 320. 29 8736.50 4276.56 -1495.59 24.00 24.00 0.15 0.39
10695.82 100.70 320. 29 8713.96 4368.32 -1571.81 0.00 0.00 0.00 0.00
10802.84 90.00 320. 00 8704.00 4450.00 -9640.00 10.00 -10.00 -0.27 -178.45
11252.83 90.17 275. 00 8703.31 4652.48 -2028.96 10.00 0.04 -10.00 -89.76
11664.02 90.17 275. 00 8702.11 4688.33 -2438.58 0.00 0.00 0.00 0.00
11739.16 90.00 272. 00 8702.00 4692.92 -2513.58 4.00 -0.22 -3.99 -93.18
11789.34 90.51 270. 06 8701.78 4693.82 -2563.75 4.00 1.02 -3.87 -75.18
12206.08 90.51 270. 06 8698.04 4694.25 -2980.47 0.00 0.00 0.00 0.00
12212.34 90.27 270. 00 8698.00 4694.26 -2986.73 4.00 -3.89 -0.95 -166.24 12-12A T3
12266.56 90.27 2~2. 17 8697.75 4695.28 -3040.93 4.00 0.00 4.00 90.04
12639.40 90.27 272. 17 8696.00 4709.39 -3413.50 0.00 0.00 0.00 0.00 12-12A T4
Survey
MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo,
ft deg deg ft ft ft ft ft deg/100ft ft ft
3500.00 18.50 293.95 3484.79 3413.79 103.3'1 46.17 -103.31 0.00 5931369.94 696738.48 Start Dir 1:
3520.00 19.22 301.04 3503.71 3432.71 109.03 49.16 -109.03 12.00 5931372.77 696732.68 Start Dir 4/
3600.00 20.22 310.06 3579.04 3508.04 130.90 64.85 -130.90 4.00 5931387.89 696710.42 MWD+IFR
3700.00 22.05 319.95 3672.34 3601.34 156.21 90.35 -156.21 4.00 5931412.72 696684.45 MWD+IFR
3800.00 24.37 328.22 3764.26 3693.26 179.17 122.27 -179.17 4.00 5931444.03 696660.67 MWD+IFR
3900.00 27.07 335.03 3854.37 3783.37 199.65 160.45 -199.65 4.00 5931481.66 696639.20 MWD+IFR
4000.00 30.04 340.64 3942.20 3871.20 217.56 204.72 -217.56 4.00 5931525.44 696620.14 MWD+IFR
4100.00 33.21 345.30 4027.35 3956.35 232.81 254.85 -232.81 4.00 5931575.16 696603.59 MWD+IFR
4200.00 36.53 349.22 4109.40 4038.40 245.33 310.60 -245.33 4.00 5931630.56 696589.62 MWD+IFR
4255.45 38.42 351.14 4153.41 4082.41 251.08 343.84 -251.08 4.00 5931663.64 696583.01 End Dir : 4
4300.00 38.42 351.14 4188.31 4117.31 255.34 371.19 -255.34 0.00 5931690.86 696578.03 MWD+IFR
4400.00 38.42 351.14 4266.66 4195.66 264.91 432.59 -264.91 0.00 5931751.99 696566.86 MWD+IFR
4500.00 38.42 351.14 4345.01 4274.01 274.49 493.98 -274.49 0.00 5931813.11 696555.69 MWD+IFR
4600.00 38.42 351.14 4423.36 4352.36 284.06 555.38 -284.06 0.00 593187423 696544.52 MWD+IFR
4700.00 38.42 351.14 4501.71 4430.71 293.64 616.77 -293.64 0.00 5931935.35 696533.35 MWD+IFR
4800.00 38.42 351.14 4580.06 4509.06 303.21 678.17 -303.21 0.00 5931996.47 696522.18 MWD+IFR
4880.76 38.42 351.14 4643.34 4572.34 310.94 727.75 -310.94 0.00 5932045.84 696513.16 UG4
4900.00 38.42 351.14 4658.41 4587.41 312.78 739.56 -312.78 0.00 5932057.60 696511.01 MWD+IFR
5000.00 38.42 351.14 4736.77 4665.77 322.36 800.96 -322.36 0.00 5932118.72 696499.84 MWD+IFR
5036.21 38.42 351.14 4765.14 4694.14 325.83 823.19 -325.83 0.00 5932140.85 696495.79 UG3
5100.00 38.42 351.14 4815.12 4744.12 331.93 862.36 -331.93 0.00 5932179.84 696488.66 MWD+IFR
5200.00 38.42 351.14 4893.47 4822.47 341.51 923.75 -341.51 0.00 5932240.96 696477.49 MWD+IFR
5300.00 38,42 351.14 4971.82 4900.82 351.08 985.15 -351.08 0.00 5932302.08 696466.32 MWD+IFR
5400.00 38,42 351.14 5050.17 4979.17 360.66 1046.54 -360.66 0.00 5932363.20 696455.15 MWD+IFR
5500.00 38.42 351.14 5128.52 5057.52 370.23 1107.94 -370.23 0.00 5932424.33 696443.98 MWD+IFR
5600.00 38.42 351.14 5206.87 5135.87 379.80 1169.33 -379.80 0.00 5932485.45 696432.81 MWD+IFR
5700.00 38.42 351.14 5285.22 5214.22 389.38 1230.73 -389.38 0.00 5932546.57 696421.64 MWD+IFR
5800.00 38.42 351.14 5363.58 5292.58 398.95 1292.13 -398.95 0.00 5932607.69 696410.47 MWD+IFR
5900.00 38.42 351.14 5441.93 5370.93 408.53 1353.52 -408.53 0.00 5932668.81 696399.30 MWD+IFR
5989.95 38.42 351.14 5512.40 5441.40 417.14 1408.74 -417.14 0.00 5932723.79 696389.25 UG1
6000.00 38.42 351.14 5520.28 5449.28 418.10 1414.92 -418.10 0.00 5932729.93 696388.12 MWD+IFR
6100.00 38.42 351.14 5598.63 5527.63 427.67 1476.31 -427.67 0.00 5932791.06 696376.95 MWD+IFR
6200.00 38.42 351.14 5676.98 5605.98 437.25 1537.71 -437.25 0.00 5932852.18 696365.78 MWD+IFR
6300.00 38.42 351.14 5755.33 5684.33 446.82 1599.10 -446.82 0.00 5932913.30 696354.61 MWD+IFR
6400.00 38.42 351.14 5833.68 5762.68 456.40 1660.50 -456.40 0.00 5932974.42 696343.44 MWD+IFR
6500.00 38.42 351.14 5912.03 5841.03 465.97 1721.90 -465.97 0.00 5933035.54 696332.27 MWD+IFR
6600.00 38.42 351.14 5990.38 5919.38 475.54 1783.29 -475.54 0.00 5933096.66 696321.10 MWD+IFR
6679.61 38.42 351.14 6052.76 5981.76 483.17 1832.17 -483.17 0.00 5933145.32 696312.20 WS2
6700.00 38.42 351.14 6068.74 5997.74 485.12 1844.69 -485.12 0.00 5933157.79 696309.93 MWD+IFR
S
S
~ ~
Sperry-Sun
BP Planning Report
Company: BP Amoco Date: 3/1/2007 Time: 09:05:54 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Referenc e: W ell: 12-12, True North
Site: PB DS 12 Vertical (TVD) Reference: 18 : 127/2/1981 00:00 71 A
Well: 12- 12 Sectioo (VS) Reference: W ell (O.OON,O.OOE,270.OOAzi)
Wellpath: Plan 12-12A Survey Calculatfon Method: Minimurn Curvature Db: Oracle
Survey
MD Inci Azim TVD Sys T~'D VS N/S E!W DLS MapN MapE TooUCo
ft deg deg ft ft ft ft ft deg/100ft ft ft
6800.00 38.42 351.14 6147.09 6076.09 494.69 1906.08 -494.69 0.00 5933218.91 696298.75 MWD+IFR
6900.00 38.42 351.14 6225.44 6154.44 50427 1967.48 -504.27 0.00 5933280.03 696287.58 MWD+IFR
6983.05 38.42 351.14 6290.51 6219.51 51222 2018.47 -51222 0.00 5933330.79 696278.31 WS1
7000.00 38.42 351.14 6303.79 6232.79 513.84 2028.87 -513.84 0.00 5933341.15 696276.41 MWD+IFR
7100.00 38.42 351.14 6382.14 6311.14 523.41 2090.27 -523.41 0.00 5933402.27 696265.24 MWD+IFR
7200.00 38.42 351.14 6460.49 6389.49 532.99 2151.66 -532.99 0.00 5933463.39 696254.07 MWD+IFR
7300.00 38.42 351.14 6538.84 6467.84 542.56 2213.06 -542.56 0.00 5933524.52 696242.90 MWD+IFR
7320.10 38.42 351.14 6554.59 6483.59 544.49 2225.40 -544.49 0.00 5933536.80 696240.65 CM3
7400.00 38.42 351.14 6617.19 6546.19 552.14 2274.46 -552.14 0.00 5933585.64 696231.73 MWD+IFR
7500.00 38.42 351.14 6695.55 6624.55 561.71 2335.85 -561.71 0.00 5933646.76 696220.56 MWD+IFR
7600.00 38.42 351.14 6773.90 6702.90 571.29 2397.25 -571.29 0.00 5933707.88 696209.38 MWD+IFR
7700.00 38.42 351.14 6852.25 6781.25 580.86 2458.64 -580.86 0.00 5933769.00 696198.21 MWD+IFR
7800.00 38.42 351.14 6930.60 6859.60 590.43 2520.04 -590.43 0.00 5933830.12 696187.04 MWD+~FR
7900.00 38.42 351.14 7008.95 6937.95 600.01 2581.43 -600.01 0.00 5933891.25 696175.87 MWD+IFR
7977.98 38.42 351.14 7070.05 6999.05 607.47 2629.31 -607.47 0.00 5933938.91 696167.16 CM2
8000.00 38.42 351.14 7087.30 7016.30 609.58 2642.83 -609.58 0.00 5933952.37 696164.70 MWD+IFR
8100.00 38.42 351.14 7165.65 7094.65 619.16 2704.23 -619.16 0.00 5934013.49 696153.53 MWD+IFR
8200.00 38.42 351.14 7244.00 7173.00 628.73 2765.62 -628.73 0.00 5934074.61 696142.36 MWD+IFR
8300.00 38.42 351.14 7322.36 7251.36 638.30 2827.02 -638.30 0.00 5934135.73 696131.19 MWD+IFR
8400.00 38.42 351.14 7400.71 7329.71 647.88 2888.41 -647.88 0.00 5934196.85 696120.01 MWD+IFR
8500.00 38.42 351.14 7479.06 7408.06 657.45 2949.81 -657.45 0.00 5934257.98 696108.84 MWD+IFR
8600.00 38.42 351.14 7557.41 7486.41 667.03 3011.20 -667.03 0.00 5934319.10 696097.67 MWD+IFR
8700.00 38.42 351.14 7635.76 7564.76 676.60 3072.60 -676.60 0.00 5934380.22 696086.50 MWD+IFR
8786.86 38.42 351.14 7703.82 7632.82 684.92 3125.93 -684.92 0.00 5934433.31 696076.80 Start Dir 4/
8800.00 38.64 350.37 7714.10 7643.10 686.23 3134.01 -686.23 4.00 5934441.35 696075.27 MWD+IFR
8900.00 40.47 344.79 7791.22 7720.22 699.98 3196.13 -699.98 4.00 5934503.09 696059.91 MWD+IFR
9000.00 42.55 339.63 7866.12 7795.12 720.27 3259.16 -720.27 4.00 5934565.57 696037.98 MWD+IFR
9100.00 44.85 334.88 7938.43 7867.43 747.02 3322.82 -747.02 4.00 5934628.50 696009.59 MWD+IFR
9132.60 45.64 333.42 7961.39 7890.39 757.11 3343.65 -757.11 4.00 5934649.06 695998.95 CM1
9200.00 47.32 330.52 8007.81 7936.81 780.09 3386.77 -780.09 4.00 5934691.57 695974.86 MWD+IFR
9300.00 49.95 326.50 8073.90 8002.90 819.32 3450.71 -819.32 4.00 5934754.46 695933.98 MWD+IFR
9400.00 52.71 322.79 8136.39 8065.39 864.51 3514.33 -864.51 4.00 5934816.88 695887.14 MWD+IFR
9480.34 55.00 320.00 8183.78 8112.78 905.00 3565.00 -905.00 4.00 5934866.47 695845.35 MWD+IFR
9492.16 55.37 320.36 8190.53 8119.53 911.22 3572.46 -911.22 4.00 5934873.76 695838.94 End Dir :
9493.62 55.37 320.36 8191.36 8120.36 911.98 3573.38 -911.98 0.00 5934874.66 695838.15 THRZ
9500.00 55.37 320.36 8194.99 8123.99 915.33 3577.42 -915.33 0.00 5934878.62 695834.70 MWD+IFR
9600.00 55.37 320.36 8251.81 8180.81 967.83 3640.79 -967.83 0.00 5934940.59 695780.57 MWD+IFR
9700.00 55.37 320.36 8308.64 8237.64 1020.33 3704.15 -1020.33 0.00 5935002.56 695726.44 MWD+IFR
9775.67 55.37 320.36 8351.64 8280.64 1060.06 3752.10 -1060.06 0.00 5935049.45 695685.48 BHRZ
9800.00 55.37 320.36 8365.46 8294.46 1072.83 3767.51 -1072.83 0.00 5935064.52 695672.31 MWD+IFR
9900.00 55.37 320.36 8422.29 8351.29 1125.33 3830.87 -1125.33 0.00 5935126.49 695618.18 MWD+~FR
9916.77 55.37 320.36 8431.82 8360.82 1134.13 3841.50 -1134.13 0.00 5935136.89 695609.10 TKNG
10000.00 55.37 320.36 8479.11 8408.11 1177.83 3894.23 -1177.83 0.00 5935188.46 695564.05 MWD+IFR
10049.64 55.37 320.36 8507.32 8436.32 1203.88 3925.68 -1203.88 0.00 5935219.22 695537.18 TJB
10100.00 55.37 320.36 8535.94 8464.94 1230.32 3957.60 -1230.32 0.00 5935250.43 695509.92 MWD+IFR
10200.00 55.37 320.36 8592.77 8521.77 1282.82 4020.96 -1282.82 0.00 5935312.40 695455.79 MWD+IFR
10300.00 55.37 320.36 8649.59 8578.59 1335.32 4084.32 -1335.32 0.00 5935374.36 695401.66 MWD+IFR
10352.19 55.37 320.36 8679.25 8608.25 1362.72 4117.39 -1362.72 0.00 5935406.71 695373.41 Start Dir 4/
10364.02 55.00 320.00 8686.00 8615.00 1368.94 4124.85 -1368.94 4.00 5935414.00 695367.00 12-12A TS
10384.02 55.00 320.00 8697.47 8626.47 1379.47 4137.40 -1379.47 0.00 5935426.27 695356.15 Start Dir 2
10392.11 56.94 320.02 8702.00 8631.00 1383.78 4142.54 -1383.78 24.00 5935431.29 695351.70 12-12A T2
10394.92 57.62 320.02 8703.52 8632.52 1385.30 4144.35 -1385.30 24.00 5935433.06 695350.14 12-12A Po!
ent
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0
S
S
S
S
S
S
S
S
2
S
S
S
S
S
S
S
S
S
0
~ - n ~
Sperry Su
BP Planning Report
Company: BP Amoco Date: 3!1/2007 Time: 09:05:54 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell: 12-12, True North
Site: PB DS 12 Vertical (TVD) Reference: 18 : 12 7/2/1981 00:00 71 A
Well: 12- 12 Section (VS) Reference: Well (O.OON,O.OOE,270.OOAzi)
Wellpath: Pian 12-12A Survey Calculation Method: Minimum Curvature Db: Oracie
Survey
MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo
ft deg deg ft ft ft ft ft deg/100ft ft ft
10395.82 57.83 320.02 8704.~0 8633.00 1385.79 4144.93 -1385.79 24.00 5935433.63 695349.63 12-12A T1
10400.00 58.84 320.03 8706.19 8635.19 1388.07 4147.66 -1388.07 24.00 5935436.30 695347.28 MWD+IFR
10500.00 82.84 320.19 8738.78 8667.78 1448.20 4219.61 -1448.20 24.00 5935506.65 695285.29 MWD+IFR
10574.43 100.70 320.29 8736.50 8665.50 1495.59 4276.56 -1495.59 24.00 5935562.35 695236.44 End Dir : 1
10600.00 100.70 320.29 8731.75 8660.75 1511.65 4295.89 -1511.65 0.00 5935581.25 695219.88 MWD+IFR
10695.82 100.70 320.29 8713.96 8642.96 1571.81 4368.32 -1571.81 0.00 5935652.09 695157.86 Start Dir 1
10700.00 100.28 320.28 8713.20 864220 1574.44 4371.48 -1574.44 10.00 5935655.18 695155.15 MWD+IFR
10800.00 90.28 320.01 8704.01 8633.01 1638.17 4447.82 -1638.17 10.00 5935729.82 695089.45 MWD+IFR
10802.84 90.00 320.00 8704.00 8633.00 1640.00 4450.00 -1640.00 10.00 5935731.95 695087.57 MWD+IFR
10900.00 90.04 310.28 8703.97 8632.97 1708.45 4518.79 -1708.45 10.00 5935798.93 695017.35 MWD+IFR
11000.00 90.08 300.28 8703.86 8632.86 1789.97 4576.48 -1789.97 10.00 5935854.47 694934.35 MWD+IFR
11100.00 90.12 290.28 8703.69 8632.69 1880.28 4619.13 -1880.28 10.00 5935894.75 694842.97 MWD+IFR
11200.00 90.15 280.28 8703.45 8632.45 1976.62 4645.46 -1976.62 10.00 5935918.56 694745.98 MWD+IFR
11252.83 90.17 275.00 8703.31 8632.31 2028.96 4652.48 -2028.96 10.00 5935924.22 694693.48 End Dir : 1 1
11300.00 90.17 275.00 8703.17 8632.17 2075.95 4656.60 -2075.95 0.00 5935927.10 694646.40 MWD+IFR
11400.00 90.17 275.00 8702.88 8631.88 2175.57 4665.31 -2175.57 0.00 5935933.22 694546.59 MWD+IFR
11500.00 90.17 275.00 8702.59 8631.59 2275.19 4674.03 -2275.19 0.00 5935939.33 694446.79 MWD+IFR
11600.00 90.17 275.00 8702.30 8631.30 2374.81 4682.75 -2374.81 0.00 5935945.45 694346.98 MWD+IFR
11664.02 90.17 275.00 8702.11 8631.11 2438.58 4688.33 -2438.58 0.00 5935949.37 694283.09 Start Dir 4/
11700.00 90.09 273.56 8702.03 8631.03 2474.46 4691.02 -2474.46 4.00 5935951.12 694247.15 MWD+IFR
11739.16 90.00 272.00 8702.00 8631.00 2513.58 4692.92 -2513.58 4.00 5935952.00 694208.00 MWD+IFR
11789.34 90.51 270.06 8701.78 8630.78 2563.75 4693.82 -2563.75 4.00 5935951.59 694157.83 End Dir : 1 1
11800.00 90.51 270.06 8701.68 8630.68 2574.40 4693.83 -2574.40 0.00 5935951.32 694147.18 MWD+IFR
11900.00 90.51 270.06 8700.78 8629.78 2674.40 4693.94 -2674.40 0.00 5935948.82 694047.22 MWD+IFR
12000.00 90.51 270.06 8699.89 8628.89 2774.40 4694.04 -2774.40 0.00 5935946.32 693947.26 MWD+IFR
12100.00 90.51 270.06 8698.99 8627.99 2874.39 4694.14 -2874.39 0.00 5935943.81 693847.30 MWD+IFR
12200.00 90.51 270.06 8698.10 8627.10 2974.39 4694.25 -2974.39 0.00 5935941.31 693747.34 MWD+IFR
12206.08 90.51 270.06 8698.04 8627.04 2980.47 4694.25 -2980.47 0.00 5935941.16 693741.26 Start Dir 4/
12212.34 90.27 270.00 8698.00 8627.00 2986.73 4694.26 -2986.73 4.00 5935941.00 693735.00 12-12A T3
12266.56 90.27 272.17 8697.75 8626.75 3040.93 4695.28 -3040.93 4.00 5935940.61 693680.79 End Dir : 1
12300.00 90.27 272.17 8697.59 8626.59 3074.35 4696.55 -3074.35 0.00 5935941.00 693647.36 MWD+IFR
12400.00 90.27 272.17 8697.12 8626.12 3174.28 4700.33 -3174.28 0.00 5935942.18 693547.37 MWD+IFR
12500.00 90.27 272.17 8696.65 8625.65 3274.20 4704.12 -3274.20 0.00 5935943.36 693447.38 MWD+IFR
12600.00 90.27 272.17 8696.18 8625.15 3374.13 4707.90 -3374.13 0.00 5935g44.53 693347.40 MWD+IFR
12633.00 90.27 272.17 8696.03 8625.03 3407.11 4709.15 -3407.11 0.00 5935944.92 693314.40 4 1/2"
12639.00 90.27 272.17 8696.00 8625.00 3413.10 4709.38 -3413.10 0.00 5935944.99 693308.40 Total Dept :
12639.40 90.27 272.17 8696.00 8625.00 3413.50 4709.39 -3413.50 0.00 5935945.00 693308.00 12-12A T4
nent
File Type: A~~ _; File Number: ~ z8329 __;'; ~ Printable Case Fi{e_Summary
See Township, Range, Section and Acreage? ,~ ~ ~~
~` Yes ~ No ~~~ „~ ~
~ Q~ C,r'~:~~ til~l°~'
Last updated on 04/06/2007.
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType-ADL&FileNumber=28329&... 4/6/2007
~ ,
Allaunder, Thomas E (DOA)
From: Nadem, Mehrdad [NademM@BP.com]
Sent: Wednesday, March 28, 2007 3:09 PM
To: Thomas Maunder
Subject: DS 12-12 ~ ~~~ - ~t'"a~
Tom,
Page 1 of 2
Thanks again for the discussing 12-12 with me. As discussed, 12-12 was completed with 9.6# brine and diesel as
freeze protect. We will circulate the crude out in IA and displace to seawater or 9.0# brine before setting the
CIBC for supporting the whipstock.
Thanks,
Mehrdad Nadem
Operations Drilling Engineer
Phane: 907/564-5941
Cel I: 907/440-0213
Email: nademm@bp.com
From: Thomas Maunder [maiito:tom_maunder@admin.state.ak.us]
Sent: Wednesday, March 28, 2007 10:46 AM
To: Nadem, Mehrdad
Subject: Re: DS 12-12
Mehrdad,
I am finishing my review of the sundry. Thanks far your response. One comment
With regard to the fluid in the IA below the cut. The fluid left in abandoned portions of wells must
exceed the hydrostatic of formations between piugs. See 20 AAC 25.112 (~. Crude should not be left
below the planned depth of your tubing cut.
Call or message with any questions.
Tom Maunder, PE
AOGCC
Nadem, Mehrdad wrote, On 3/27/2007 1:29 PM:
Tom,
This Email is a follow up to our discussions earlier today regarding Sundry Application for 12-12.
Below, please find my response to your questions.
Thank you for your comments. I look forward to continue working with you, and very much
appreciate you time.
Mehrdad Nadem
Operations Drilfing Engineer
Phone: 907/564-5941
7/6f2007
~ Page 2 of 2
~
Cell: 907/440-0213
Email; nadem_mC~bp.com
1. In Step 3, you indicate that a"top of cement" might be tagged at 10100',
however that does not agree with the drawing you have provrded showing the
existing weii. Would you please confirm the depth? You note that the cement
volume might need to be adjusEed (step 4}.
It appears that considerable amount of fill has settled in the 7" casing since the
well was drilted. It is also conceivable that the fill contains some cement left
behind during the coil tubing squeeze operations. The top of fill could be as high
as 10,089'. To confirm the top of the fill, 1 have requested tagging the TD
before laying cement for the plug and abandon operation.
The schematic that I attached to the Sundry Application shows the PBTD when the
well was initially completed.
2. In Step 6 you plan to pertorm a CMIT T x IA and an MIT OA. Is it expected that
these tests wiil pass to fluid? Do any tests from Problem Wells show a leak lass
rate? Similar tests are proposed after the rig arrives.
MIT-OA has passed a number of times, the last test was performed on March 12,
2007. CMIT- TxIA passed to 2,000 psi on April 24, 2004.
The reason for duplicating the MIT-OA and CMIT TxIA is to comply with BP's
Barrier Policy.
3. Has the IA been reeently circulated between the packer and where you
plan to cut? It is proper to have fluid with known properties in this space.
On August 15, 2004 415 barrels of crude was pumped down the IA.
4. Step 24 of rig procedure tests the 9-5/8" and 13-3/8" casing. I presume that if
earlier tests have failed badly that the 7" tieback scenario will come into play. ~n
either case, t believe the upper portion of the 9-5/8" casing will be replaced.
Although an outer annulus re-pressurization test (OART) passed on April 17, 2005.
The Pad Engineer suspects that there is a preferential leak to gas most likely through
the buttress threads of the 9-5/8" casing. We would like to cut and pull the 9-5/8"
casing above the 13-3/8" surface casing shoe based on USIT results. We could run a
7" tieback independent of the 9-5/8" casing, and could change the well head without
cutting and pulling the 9-5/8" casing, although this is not a preferred option. We will
make all efforts to replace the 9-5/8' casing with a new string of 9-5/8", 47#, L-80 with
TC-II connections. We plan to cement the 9-5/8" x 13-3/8" annulus to surface.
5. Step 28, I believe you will need to set slips prior to cutting off.
Yes. In fact I had ordered the slips over a week ago. Per your comment, I will include
a line noting setting of the slips.
I am meeting with Cameron reps on Thursday to develop a detailed program for
changing the wellheads for inclusion in the Drilling and Completion Program.
7/6/2007
~
Terri L. Hubbie
BP Exploration AK inc.
PO Box 196612 MB 7-5
Anchorage, AK 99519
PAY TO THE
ORDER OF
"Mastercard Check"
\J
89-8/1252 329
OATE _ ~~
~ C~CJ . ~
~:L25200060~:99L46227i556~~' 0329
First National Bank Alaska
Anchorage, AK 99501 ~ . ~
MEMO I
~
-J
TRAYSMIT"1C"AL LE'I'TER CH~CKLIST
WELL N~+1NIE ~,d'~ /o?-/~?,<,!
PTD# _ ~~C`~~ - O~~
~, Development Service Exptoratory Stratigraphic Test
Yon-Coaventio~eat Welt
Circ[e 4ppropriate Letter / paragraphs to b~ Included ia Transmitta! Letter
! CE~CK i ADD-ONS
~ wHAr ~ (OPTI0IVS)
; APPLIES l
TEXT FOR APPROVAL LETTER
; I NRiLTI LATERAL ~ The permit i~ for a new we{Ibore segment of existing !
! ~ well '
; ~(If last two digits ~n I permit Yo. , AP[ No. ~0-
~ ~ AP[ rtumber are ; '--____~,
, ; between 60-69) Production ~hould continue to be reported as a function of the'
~ ~ origina! 4Pt number stated above.
~ ~ PILOT f~fOLE ~[n accordance with 20 AAC 25.00> >
~ ~ (~, atI records, da.ta and to~s ,
i j ; acquired for the pilot hoie must be cleazly dii~erentiated in bothi
; ~ ; wetl name ( PF~ and API number I
i ; '(50- - -_) from records, data and logs ~
I ~ ~ acquired for we(1 i
~ i
; i SPACING
~ ' EXCEPTION
! i
i i
~ ~ The permit is approved subject to futl compliance with 20 AAC
~ 2~.055. Approvat to perforate and t~roduce / iaject is contingent
I upon issuance of a conservarioa ocder approving a spacing
l exception. assum~s the
~[iabi(ity of any protest to the spacing exception that may occur.
~
' ~ DRY DCI'CH ~
~ AII dry ditch samp(e sets submitted to the-Eommission must be in ;
~ i SA!~IPGE i no greater ttran 30' sa:mple int.ervals from below• the permafrost or ;
~ ~
' I from where samp[es are first caught and 10' sample intervals ;
~
;
i ~ through target zones. ;
~
~ ~
i i~oii Conventionat j Please note the fotlowing. specia! condition oF thes permic: ~
i production or production testing of coal bed methane is not allow~d i
; i ~ for (czarr~e of weIl~ until after (Cocnnanv Name) has designed and ~
~ ~ implemented a water well testing program to provide baseline data
i
~ ~
; on water quality and quatttity. (Compa~. ame) must cantact the
' ~ Commission to obtain advance approval of such water we!! testing ;
~
I_ ~ Pcoqrant I
Rev: I'2~i06
C:`jody~transmictal checklist
Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 12-12A Program DEV Well bore seg I~
PTD#:2070490 Company BP EXPLORATION (ALASKA) INC Initial Class(fype DEV / PEND GeoArea 890 Unit 11650 OnlOff Shore On Annular Disposal ^
Administration 1 Pe[mit_fee attached_ _ _ _ _ _ _ _ _ _ _ _ _ _
- - - - -
Yes
-
- -
2 Lease number appropriate_ _ _ _ _ _ .
- Yes _ _ _ . . _ _ . _ _
.
3 Uniquewell_nameandnumber__________________________________.__ Yes_ ______.__________.____________
- -- -- - ------ -- -- -- -- -- -- --
4 Well localed in_a_defined_pool. , _ _ , _ . Yes . . _ _ _ _ Prudhoe Ba Field-Prudhoe Ba .Pool.
Y_ Y .
5 Well located proper distance f[om drilling unit_bo~nda_ry_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ye~ _ _ . _ . _ _ . . _ . . .
6 Well locat_ed proper distance from other wells_ . _ _ _ , _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7 Suffcientacreageayail_ablein_drillinqunit______________________________ _ Yes_ _.______,__.__________
8 If deviated, is,wellbore plat_included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ .
9 Operatotgnlyaffectedparty-------------- ---- - ---------------- - Yes- _---
10 Op~rakorhas_appropriate_bondinforce________________
- Yes_ _.._.Bond#619419$_.____________________________________
---- --
11 Permit_canbeissuedwithoutcons@ryaiionorder_______ _______________ ____ Yes_ ____________ ,______ ___._
Appr Date 12 Petmit.can be issued without ad_ministrative_approval _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . . _ . _ _ _ _ . _ _ . , _ _ . _ _ ,
ACS 4I612007 13 Can permit be approved before 15-day wait Yes
14 Well located within area and_strata authorized ~y_Injecti_on O[de[ # (puk 10# in_comment~)_ (Fpr. NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
15 Ali wells within 1/4_mile area of reyiew identified (For service well only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ . _
- -------- - - ------ -- -- -- ------ -
16 Pre-produced injector; ducation_of pre production I_ess than 3 months_ (For_se[vice well only) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _
17 Nonconyen, gas confgrms to AS31,05,030~.1.A),Q.2.A-Dj _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ . _ _ , _ _ . _ _ _ ,
Engineering
18
Condu_ctor string_provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NA_ _ -- - --
_ _ _ _ _ Conductar set.in 12-12 (181-083)..
19 Surface casing,protect& all_known_ U$DWs _ _ _ _ _ _ _ _ _ „ _ NA_ _ _ _ _ _ _ $urface casing set in 12-12, _
20 _C_MT_voladequate_to ci[culate.on conductor & surf_csg _ _ _ _ _ NA_ _ _ _ _ _ _ Surface casing set in 1_2-12. _ _
21 CMT.vol adequate,to tie•in long string to su _rf csg_ ___ __ Yes _ ____ The]" liner and_ti_eback a[e planned_ to be fully cemented._ Window ~ 850' below surface casing shoe._
.
22 CMT_will coyer ali known_productive horizon_s_ . _ . _ . . _ _ No_ _ _ _ _ . _ Slotted liner completion planned._ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
23 CaSing desgn& adequate fo[ G,_T, B &_permafrost_ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ .
24 Adequaie tankage_or reserve p~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ . _ Rig is_e_quipped with steel_pits. _ No reserve_pitplanned, All waste to_approved dispos_alwell(s). _ _ _ _ _ _ _
.
~ 25 If_a_ re-drill, has_a_ 1_0-403 for abandonment been approved _ _ _ Yes _ _ _ _ _ . , 307-104 _ _ _ _ _ _ _ . _ _
26 Adequate wellbore separation_proposed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Proximity analysis performed, _Gyros_likely on adjacent wells to con_firm locations_plan and clearances. _ _ . , _ _
27 If_dive[ter required, does it meet regulations. _ _ . . .
- NA_ _ _ _ _ , . BOP stackwill already_be in place_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Appr Date 28 Driliing fluid_ program schematic & e ui list ad~quate. ,
~ p
Yes Maximum expected fo[matipn pressure 7,1_EMW._ Planned MWS 11.5 ppg_ in 8-1/2" hoie and,8.5 ppg in Sad, _
TEM 411112007 29 _B_OPEs,_dotheymeetregulation-----.__--- Yes- ----- -------------- -- _-_--_-----_.---_ -,--_--_-----------
g~~q~~ fl
~ 30 BOPE.press rating appropriate; test to_(put psig in comments) ___ Yes _ __ MASP calculated at 2338 psi_ 3500 psi BOP teStplanned, __
~r ~~'T
~ ~ 31 Choke_manifold complies wlAPI_ RP-53 (May 84) . Yes _ _ _
~ 32 Work will occur without operation shutdown _ . _ _ Yes _ . _ _ _ _
.
33 Is presence_of H2S gas, probable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes _ _ . _ _ _ _ H2S is reported_in offset Rroduction._ Mud should p[eclude pn, rig, Rig has senso[s and alarms, _ _ _
34 Mecha_nical_condition o(wells within AOR yerified (For_service well only) _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , _ _ _
Geology
35
Permit_can be issued wlo hydrogen, sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
No_ _ - - ---- --------- -------
_ _ , . . _ Nearesf wells:_ 12-13=10 ppm; 13-02B=50 ppm;_12-17=50_ppm, (12106), . _ _ , _
~ 36 Data.ptesented on_potential overpre&sur_e zones_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . NA . _ , _ . _
Appr Date 37 Seismic_analysis of shallow gas_zones_ .____.
NA
. -
ACS 416I2007 38 Seabed condition survey_(if off-sho[e) ._._:
NA
39 Contact namelphone for weekly,p_rogress reports [exploratory only~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Mehrdad Nadem - 564-5941 _
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Comm' ' Date
D~S ~ ~1 ~ ~ //-o ~-
/ /
~
~