Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout207-061~ •
~: ~ ~~ ~ ~ ~~"~~ ~~~ ~~~~~, . ~~~~ ~~~~~~ ~ ; ~
~~ 3^I~~
T~is page identifies those iterns that ~nrer~ ~o~ ~caro~ed ~c~~-c~g ~~e ~~it~a~ ~r~da~ctio~ 5cara~ir~g ~-7ase.
They are available ir~ the original file, r~ayr be ~car~~ed during ~ specia~ resca~ activ~ty or are vievvable
~y direct araspectior~ of the file.
~ ~ ~ D ~p ~ eil ~listory ~ile Icleratafaer
OI'~?/3/Z/l'A~ (done) ~ Two-sided III (IIIIIIIII~ (~IIt ^ F2escan Needed I~I ~I~~~~I~~I ~IIII~
RES A!V D1GI AL DATA Oi/ERSIZED (Scannable)
Color Items: Diskettes, No. ' ^ Maps:
^ Greyscale items: ~ Other, No/Type: ^ Other Items Scannable by
a Large Scanner
~ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: aria Date: $ t ~ /s/
Project Proofing II I II'I II II III II III
BY: Maria Date: g ~' ~ /O ~ /s/ ~
Scanning Preparation J x 30 =
BY: Maria Date: 1
Production Scanning
- ~ -
d + = TOTAL PAGES_~
(Count does not include cover sheet)
~(~'/ .- . /s/
Stage 1 Page Count from Scanned File: ~(Count does include cove sheet)
Pa e Count Matches Number in Scannin Preparation: ~YES NO
9 g
BY: Maria Date: g~ ~ ~S~ ~~
Q 7,l q
/
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: ~S~
Scanning is compiete at this point unless rescanning is required. II I(I II II I II II I I II)
ReScanneal II I(I'I II I) III I I II)
BY: Maria
Date:
/s/
Comments about this file:
QualityChecked III~I~(~I~~~~~II~I)
10/6/2005 Well History File Cover Page.doc
4~
~`.
~`~
MICROFILMED
6/30/201.0
DO NOT PLACE
ANY NEW- MATERIAL
UNDER THIS PAGE
C`\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
~ ~ ~' ~
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2009
Permit to Drill 2070610 Well Name/No. PRUDHOE BAY UNIT E-11 BL1 Operator BP EXP~ORATION (ALASF(A) INC API No. 50-029-20475-60-00
MD 13547 ND 9062 Completion Date 7/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATIDN
Types Electric or Other Logs Run: MWD DIR, GR, RES (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
iype menirrmt rvumoer Name ~caie meaia no Statt stop c:n rtece~vea ~omments
• D D Asc Directional Survey 0 13547 Open 9/25/2007
Rpt Directional Survey 0 13547 Open 9/25l2007
~D D Asc Directional Survey 0 12819 Open 9/25/2007 PB 1
Rpt Directional Survey 0 12819 Open 9/25/2007 PB 1
D Asc Directional Survey 0 12636 Open 9/25/2007 PB 2
Rpt Directionai Survey 0 12636 Open 9/25/2007 PB 2
D C Las 15767~duction/Resistivity 11056 13547 Open 12/3/2007 ATR, RPM, GR, RAM,
ROP w/PDF graphics i
C Las 15768~duction/Resistivity 11056 12819 Open 12/3/2007 PB1 ATR, RPM, GR, RAM, ~
ROP w/PDF graphics
' D C Las 15769vfnduction/Resistivity 11056 12636 Open 12/3/2007 P62 ATR, RPM, GR, RAM,
ROP w/PDF graphics
pt LIS Verification 11050 12820 Open 3/14/2008 PB1 LIS Veri, GR, ROP,
RPD, RPS
D C Lis 16040 `fnduction/Resistivity 11050 12820 Open 3/14/2008 wlPDF and Tif graphics
f~pt LIS Verification 11050 13525 Open 3/14/2008 LIS Veri, GR, ROP, RPD,
RPS
C Lis 16041 ,"induction/Resistivity 11050 13525 Open 3/14/2008 LIS Veri, GR, ROP, RPD,
RPS
~pf~ LIS Verification 11050 12637 Open 3/14/2008 P62 LIS Veri, GR, ROP,
RPD, RPS
~~
~
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2009
Permit to Drill 2070610 Well Name/No. PRUDHOE BAY UNIT E-116L1 Operator BP EXPLORATION (ALASF(~ INC API No. 50-029-20475-60-00
mu isa4i i vu a~o< <,ompietwn vate ii iwcwi ~ompieuvn ~iaius i-vi~ ~w~en~ ~~awa ~-v~~ vw ~.
C Lis 16042 nduction/Resistivity 11050 12637 Open 3/14/2008 P62 LIS Veri, GR, ROP,
RPD, RPS
Log Induction/Resistivity 25 Col 11100 12814 Open 3l17/2~08 PB1 MD MRP, GR 28-Jun-
2007
Log Induction/Resistivity 25 Col 11100 12814 Open 3/17/2008 P61 ND MRP, GR 28-Jun-
2007
Log Gamma Ray 25 Col 11100 12814 Open 3/17/2008 P61 MD GR 28-Jun-2007
Log See Notes 2 Col 11041 12779 Open 3/14/2008 PB1 Depth ShiftMonitor
Plot
Log Induction/Resistivity 25 Col 11100 13543 Open 3/17/2008 MD MRP, GR 05-Ju1-2007
Log Induction/Resistivity 25 Col 11100 13543 Open 3/17/2008 TVDD MRP, GR 05-Ju1-
2007
Log Gamma Ray 25 Col 11100 13543 Open 3/17/2008 MD GR 05-Ju1-2007
Log See Notes 2 Col 11041 13527 Open 3/14/2008 Depth Shift Monitor Plot
Log Induction/Resistivity 25 Col 11100 12631 Open 3/14/2008 PB2 MD MRP, GR 05-Ju1-
2007
Log Induction/Resistivity 25 Col 11100 12631 Open 3/14/2008 P62 ND MRP, GR 05-Ju1-
2007
Log Gamma Ray 25 Col 11100 12631 Open 3/14/2008 PB2 MD GR 05-Ju1-2007
Log See Notes 2 Col 11040 12590 Open 3/14/2008 P62 Depth Shift Monitor
Plot
Well Cores/Samples Information:
Interval
Name Start Stop
Sample
Set
Sent Received Number Comments
~~
~
~
DATA SUBMfTTAL COMPLIANCE REPORT
7/6/2009
Permit to Drill 2070610 Well Name/No. PRUDHOE BAY UNIT E-11 BL1 Operator BP EXPLORATION (ALASFCA) INC API No. 50-029-20475-60-00
MD 13547 ND 9062 Completion Date 7/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N
ADDITIONAI I NFORMATION
Well Cored? Y~}' Daily History Received? ~ N
Chips Received? "47'RI-~ Formation Tops ~N
Analysis ~P4--
Received? ~
Comments:
Compiiance Reviewed By: 1 I n _ Date:
~ ~
/ ~
s NV6NE5
Saker Atlas
PRINT DISTRIBUTION LIST
COMPANY
~4'ELL NA.~vIE
FIELD
BP EXPLORATION (ALASKA) INC
PBli E-11BL1 PB2
PRUDHOE BAY UNIT
THIS DISTRIBUTION LIST AUTHORIZED BY
COUVTY NORTH SLOPE BOROUGH
STATE ALASKA
DATE 3/13/2008
CATRINA GUIDRY
SO #: 1439286
Copies of Copies Digi[al Copies of Copics Digital
Each Log of Film Da[a Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC Company
Person PETROTECH,VICAL DATA CENTER Person
Address LR2-1 Address
900 E BENSON BLVD.
ANCHORAGE. AK 99508
I Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address 800 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE. AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
-,:=z~ - =
_.:.. ~, - ., , .~ :
Data Disseminated Bv~ BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 ~~;~~ ~~ !~~j~ ~~"
This Distribution List Completed Bv:
~~
1/ ~~~r~ ( n (
V1
I
V
{~; ~ . , ~ ~ ~..: ~e
Page 1 of 1
~ ~
//~~
BAKER
H~J~'sHES
Saker Atlas
PRINT DISTRIBUTION LIST
COMYANY BY ~:XYLUIZA'11UN (ALASKA) 1NC CUUN 1'Y NUK1H SLUYE 13UKUUGH
WELL NAME PBU E-11BL1 PBl STATE ALASKA
FIELD PRUDHOE BAY IJNIT DATE 3/13/2008
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY
SO #: 1439286
Copies oC Copiw Digital Copies of Copies Digital
Each Log of Film Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKAI INC Company
Person PETROTECHNICAL DATA CENTER Person
Address LR2-1 Address
900 E BENSON BLVD.
ANCHORAGE AK 99508
1 Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address 800 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE. AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated By BAKER ATLAS-PDC 1701 ~ Aldine Westfield~Houston. Texas 77073
This Distribution List Completed Bv: ~
V
~v~~~O ~
~ h.~a ~ . Y -+~=~-.$
g
~ Y (y 9
'~ ~ f- .{ ~ - i
~~~ ~., s35 '.. ~~_,.3...~ ~,,. _.. _ . ~ ...y3 P
t? .i ~ =~ ; ,.,~
r~ . , ~~;c~
Page 1 of 1
~ ~
~/ ~~
BAKER
H~/GNES
Baker Atlas
PRINT DISTRIBUTION LIST
C(JMYAN Y 13Y hXYL(JKA 1lUN (ALASKA) 1NC; CUUN 1 Y N(~Kl'H SLUY~; tiOKUUGH
WELL NAME PBU E-11BL1 STATE ALASKA
FIELD PRUDHOE BAY UNIT DATE
3/ 13I2008
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDIZY
SO #: 1439286
Copies of Copies Digital Copies of Copies Digital ~~
Each Lo of Film Data Each Log of Film Da[a
2 Company BP EXPLORATION (ALASKAI INC Company
Person PETROTECHNICAL DATA CENTER Person
Address LR2-1 Address
900 E BENSON BLVD.
ANCHORAGE AK 99~08
i Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address S00 BELL STREET Address
GSC EMB 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated Bv' BAKER ATLAS-PDC 17015 Aldine Westfield Houston_ Texas 77073
This Distribution List ComDleted Bv:
t ' ~N9 ~- 1 ' i
~ ^, ~ ~ _
°.,'3r
~ ..~ 1 ~ . ~
~~~ V ~~
~~
Page I of l
~
~
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7`h Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: PBU E-11BL1 PB2
; ~ ~~s ~ ~ . ~_, ~ w
`',. . ~ -, __ ; ~
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 color prints - GR Directional Measured Depth Log (to follow)
1 color prints - MPR/Directional TVD Log (to follow)
1 color prints - MPR/Directional Measured Depth Log (to follow)
LAC Job#: 1439286
Sent by: Catrina Guidry Date: 03/13/08
Received by: ~ Date:
PLEASE ACKNOWLEDGE RECEIPT BY 5IGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Baker Hughes INTEQ /~~~ _~~ C~ ~~ ou a
~~~ 7260 Homer Drive ~`U
~ Anchorage, Alaska 99518
Direct: (907) 267-6612
~~~EQ FAX: (907) 267-6623
~
~
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7~h Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: PBU E-11BL1
~~~
~ ~ -~ ~, .
~~ b a~. su~~
~ . ~ ~ ~ ~ ;,~ ~:~;~e ~'~_~;~~~~
~ ,~ ~
~x ~~~~~~
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 color prints - GR Directional Measured Depth Log (to follow)
1 color prints - MPRIDirectional TVD Log (to follow)
1 color prints - MPRJDirectional Measured Depth Log (to follow}
LAC Job#: 1439286
Sent by: Catrina Guidry Date: 03l13/08
1
Received by: I y,
l/
Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
~~.
~
1lV fN:(j
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska 99518
Direct: (907) 267-6612
FAX: (907) 267-6623
~~~ _v~ r
~" /~~ L/~
i ~
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7th Ave.
suite ioo
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: PBU E-11BL1 PB1
~;~~~_~;
,~ ~~,~ ~
~~1~~ ~. ~ ° .,.,
~ ~ ~ ~ ~~s ~'~~~~, ~~~, ~~~~:~; ;
t~~r ;~d'~~~~
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 color prints - GR Directional Measured Depth Log (to follow)
1 color prints - MPR/Directional TVD Log (to follow)
1 color prints - MPR/Directional Measured Depth Log (to follow)
LAC Job#: 1439286
Sent by: Catrina Guid Date: 03/13l08
Received by:
~ Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Baker Hughes INTEQ
~~~ 7260 Homer Drive
~ Anchorage, Alaska 99518
Direct: (907) 267-6612
~IYTEQ FAX: (907) 267-6623
~D°~-d lo ~ ~/(o D ~(~
~ Date 11-30-2007
Transmittal Number:92922
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
If you have any questions, please contact Douglas Dortch at the PDC at 564-4973
Contents
05-28B ~ot,-v~°~ ~ I~S-a-(~~{
05-28BP61 ~o(o-~~~ `~ iS~~~
1-39A/N-16~~:~-~~'~ l.~ ~to~
1-39A/P61 ~vc,- ~ b~ ~ 5`$-~s3
15-12B -~o /a't~ i
C-32C ~o~ -l39 ~ is~6~
E-11B -no ~P3
E-11 BL1 ~o~--o~! ~ ~~~{~~..
E-116L1-01 ~O~--bL~~'(~ ~a
E-11 B~1 PBi ~o~-ot~ - ~ is~~;~
E-11BL1PB2a~~.-d~! a~s~,',~
E-19B aa~--o'~~ ~ i ~3~ ~ :
G-25B av~-b ~~O *' ~5~~-~
NK-14A~ 26~-03 ~ ~ ~~-~3
NK-14APB1 ~0~-03~ t~ r~~~z~
NK-61A ~6(o-p3~" ~ 15~~ S
_h
Please Sign and Return one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Petrotechnical Data Center LR2- t
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 1 9-66 1 2
~ ~
INTEQ
To Whom It May Concern:
ri~r
BAKER
NUQFIES
7260 Homer Drive
Anchorage, Alaska 99518
Te1907-267-6600
Fax 907-267-6623
September 20, 2007
Please find enclosed directional survey data for the following wells:
E-11BL1PB1 E-19B
E-11BL1PB2
E-11BL1
E-11BL1-O1
G-25BPB 1 02-16CPB 1
G-25B 02-16C
OS-28BPB 1
OS-28B
Enclosed for each well is:
2ea copies of directional survey reports
lea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration(Alaska)Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
, ~ i}
RECEIVED BY: , ~;;lv~ , State of Alaska AOGCC
DATE: ,~ - ~
Cc: State of Alaska, AOGCC
~b7~ ~ ~ ~
. ' STATE OF ALASKA 8 SO~
ALASKA~L AND GAS CONSERVATION COM~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
,-,~ ~.... ~~.. ~-; ~ ~ ~ ~
,.~.
, :~ 2~07
' ~t~~. C~mmiss~an
1 a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended
2oao,c 2s.~os 2oaac 2s.~,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class -_,.~
~ Development I~ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban
7/10/2007 .,D~ 12. Permit to Drill Number
207-061 ~
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
6/24/2007 ~ 13. API Number
50-029-20475-60-00 '
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
7/5/2007 ~ 14. Well Name and Number:
PBU E-11 BL1 ~
463
FNL, 500
FEL, SEC. 06, T11 N, R14E, UM
Top of Productive Horizon:
4227' FSL, 1712' FWL, SEC. 32, T12N, R14E, UM
8. KB (ft above MSL): 57.83'-
Ground (ft MSL): 30.28'
15. Field / Pool(s): ~
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
4633' FSL, 2867' FWL, SEC. 32, T12N, R14E, UM 9. Plug Back Depth (MD+ND)
13547 9062_ Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 664452 y- 5976601 Zone- ASP4 10. Total Depth (MD+ND)
13547 9062 " 16. Property Designation:
ADL 028299 -
TPI: x- 666545 y- 5981338 Zone- ASP4
Total Depth: x- 667689 y- 5981770 Zone- ASP4 11. SSSV Depth (MD+ND)
None 17. Land Use Permit:
18. Directional Survey ~ Yes ^ No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed infor tion per 20 AAC 25.071):
MWD DIR, GR, RES 7D~ <.//N~os,/G~ /!lJo~ iild ~it3o?'>Y~
Z2. CASING, LINER AND CEMENTING RECORD
CASMG SETTING DEPTH MD SETfING DEPTH ND HOLE AMOUNT' '
W7. PER FL GRADE TOP ' BOTTOM' TOP: BOTTOM SIZE CEMENTING RECORD PUlLED> '
2-3/8" 4.7# L-80 11686' 13547' 9052' 9062' 4-1/8" Uncemented Slotted Liner
23. Open to production or inject ion? ~ Yes ^ No 24. ; Tueiw~ Reco~o
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Size and Number): Size ~EPTH SET MD PACKER .SET MD
2-3/8" Slotted Section None: 4-1/2", 12.6#, 13Cr80 10963' 10906'
MD TVD MD ND
11695' - 13514' 9052' - 9062' Well Branch Well Branch
E-11 BL1 E-11 BL1 25.' Ac~o, FRACTURE, CEMENT SQUEEZE, ~c.
Departs From is not Directly DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED
Well Branch Accessible
E-11 BL1-01 11112' Set Whipstock (To Drill E-11 BL1)
,
PTD # 207-062
at 11684' MD
'
N~)
~~
Z6. PRODUCTION TEST
Date First Production:
Reported on E-11 BL1-01 Method of Operation (Flowing, Gas Lift, etc.):
See E-11 BL1-01 (Dated 08/02/07), PTD 207-062) for Production & Test Data
Date of Test: Hours Tested: PROOUCrioN FoR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: CA~cu~a,re~
24-HouR Ftare• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API ~CORR~:
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit sepa~ate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical res~ ~r 250.071.
~-/~~
-vone ~~ SEP 121U0~
~ _ _,
w.._. :..~.~ .m ~~.~.
Form 10-407 Revised 02/2007 ~~~ ~ 1~ A~NTIN ED ON REVERSE SIDE `~ ~~^j ~
~
28. GEOLOGIC MARKERS ~LIST AlL FORMATIONS AND ERS ENCOUNTERED~: Z9. FORMATION TESTS
NAME M ND Well Teste . ^ Yes ~ No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.077.
Sag River (From Parent) 11102' 9023' None
Shublik 11157' 9071'
Top Shublik / Base Sag 11463' 9082'
Formation at Total Depth (Name):
Sag River 11102' 9023'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~ ' Title Technical Assistant Date ~ ~
PBU E-11 BL1 207-061 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Mary Endacott, 564-4388
Permit No. / A roval No.
INSTRUCTIONS
GeNeraa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one poo! with produclion from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and~base of permafrost in Box 28.
ITe~w 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITea~ 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
Digital Wellfile
~
Well: E-11
Well Events for SurfaceWell - E-11
Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GC1 -> E-> E-11
Date Range: 08/May/2007 to 12/Jun/2007
Data Source(s): AWGRS
Events
Source Well Date Description
C~
Page 1 of 2
AWGRS E-116L1 06/12/2007 SET 4" CIW BPV PRE RIG WORK API VAIVE SHOP
AW_GRS E-i1B 06/10/2007 T/I/O = 2/24/0. Temp = SI. WHP's (post CTD). TBGP increased 1 psi, IAP increased 14 psi,
OAP unchanged overnight.
AWGRS E-11B 06/09/2007 TIO = 170/Z30/0. Temp = SI. Bleed WHPs to 0 psi (pre-CTD). No AL TBG FL @ 120'. IA FL
@ 90'. Bled TBGP from 170 psi to 0 psi in 30 mins, all gas. IAP unchanged. Bled IAP from
230 psi to 0+ psi in 1.5 hrs, all gas. TBGP increased 1 psi during IAP bleed. Monitored 30
mins. TBGP unchanged, IAP increased 10 psi. FWHPs = 1/10/0.
AWGRS E-116 06/07/2007 T/I/O = 160/210/0. Temp = SI. WHP's (Prep for CTD).
AWGRS. E-11B 06/02/2007 *** WELL SJ IN ON ARRIVA~ *** ( pre ctd )*** DRIFTED TO 11096' SLM W/ 2' X 1.875
STEM & 3.80 CENT. RIH W/PDS MEMORY GR/CCL TO TOP OF WHIPSTOCK (11,096'SLM).
LOGGED UP FROM 11,096' TO 10,750'SLM. LOG SHOWS WHISTOCK AT 11,113', ***RDMO,
RETURN TO DSO S/IN***
AWGRS E-11B 06/01/2007 T/I/0=0+/0+/0+. Temp SI. Monitor (post-bleed for secure, pre-CTD). TBGP unchanged. IAP
unchanged. OAP unchanged.
AWG.RS E-118 05/31/2007 T/I/0=70/350/0 Temp=SI Bleed WHPs to 0 psi (pre-CTD). IA FL @ 48'. Bled IAP to bleed
. trailer from 350 psi to 50 psi in 60 minutes (FTS). Switched to TBG bleed. TBG FL near
surface. Bled TBG pressure from 70 psi to 0 psi in 20 min (all gas). Continued to bleed IAP
from 50 psi to 0 psi in 4.5 hrs (fiuid & gas mix) < 2 bbls returned. Monitored for 30 min. No
change in WHPs. Final WHPs=O/0/0
AWGRS E-11B 05/29/2007 T/I/O = 80/340/0+. SI. WHPs (pre-Rig).
AWGRS E-11B 05/28/2007 *** JOB CONTINUED FROM 05-27-07 WSR *** TAGGED WHIPSTOCK @ 11,115' SLM W/
3.75" LIB TO CONFIRM GOOD SET LIB SHOWED CLEAN PICTURE OF SET WHIPSTOCK. ***
WELL LEFT S/I ON DEPARTURE ***
AWG..RS E-liB 05/27/2007 *** WELL SHUT IN ON ARRIVAL *** (fish e-line tools) FISHED E-LINE TOOLSTRING &
BAKER SETTING SLEEVE FROM TREE. STANDBY FOR E-LINE CREW. *** JOB CONTINUED
FROM 05-28-07 WSR ***
ALNGRS E-11B OS/27/2007 CTU #5.***Continued from 5-26-07 WSR***Fish E-line tools and whipstock setting
assembly. RIH with Baker fishing string and 4.5" GS Spear. Tag fish @ 11084' ctmd. Jar up
4 times at 37k (22k over pick-up weight) and fish appeared to come free. POOH replacing
voidage down backside of coil with 50/50 meth. At surface,perform lubricate and bleed to
insure well is fluid packed and bled off with 14 bbls of SO/50 meth. Close master valve il
turns and catch fish at the bottom of the slickline bait sub on top of the master valve. Tag
wellhead as freeze protected and Danger tag installed due to potential of fish containing RA
tag in whipstock. RDMO CTU. Notify pad operator of wefl status. *** Job complete ***
Pubiishing to Interact
AWGRS E-118 05/26/2007 CTU #5. ***Continued From 5-25-07 WSR***Fish e-line tools and whipstock setting
assembly. RIH with Baker fishing tools and 4.5" GS Spear. Tag fish at 11085' ctmd. Jar up at
max overpull 50 times(40k pick up weight) ~ 16k overpull. No luck fishing. Pump off GS and
POOH. Cut 150' coil for maintenance. MU new Baker MHA and tool string. Blow down CT with
N2 at surface prior to RIH. RIH with Baker fishing tools and 4.5" GS Spear. Bullhead 64 bbl
Flo-Pro w/3% Lo-Torque and 2% MI-776 ube pill. Displace to bottom with 35 bbls of 1% KCI
and 50/SO meth. 4 bbls into meth stage, erratic pressures noted on electronic circ pressure
gauge. POOH to investigate tubing integrity. OOH, pipe in good shape. Inspect MHA and
pressure test coil and connector to 4000psi. Pressure test on well. Blow down reel with N2.
***Job Continued on 5-27-07 WSR***
AWGR_S E-11B OS/25/2007 CTU #S. Fish Wireline Tools. Perfrom Weekly BOP Test. MU Baker fishing string with 4.5" GS
Spear. Bullhead 151 bbls of 2% KCI with 0.6% SafeLube and 32 bbls of 50/50 meth. RIH
and latch at 11079' ctm. Attempt to move fish by jarring down 5 times, jarring up 4 times,
jarring down then up 35 times, finally 10 hits up were at max CT pull (~18k over CT string
weight). Fish never appeared to move either up or down. Pump off fishing and POOH
pumping SO/SO meth for dispiacement. Cut 150' pipe for pipe management. MU Baker MHA
and fishing string wJ4.5" GS spear. RIH ***Job Continued on 5-26-07 WSR***
_A.WGRS E-11B OS/24/2007 CTU #5. MIRU Begin Weekly BOP test. ***Job Continued on 5-26-07***
AWGRS E-116 05/24/2007 ***WSR CONTINUED FROM 5/23/2007*** (fish e-line toolstring) MADE SEVERAL ATTEMPTS
TO FISH E-LINE TOOLSTRING WITH BRAIDED LINE. SET 4 1/2" BAITSUB, AND 3.70"
OVERSHOT (1.66" SPIRAL GRAPPLE, 47 3/4" O.A.L. W/ 4 1/2 G BAIT SU8 -HEAVY FN). ON
http://digitalwellfile.bpweb.bp.com/We1lEvents/Home/Default.aspx 7/31/2007
Digital Wellfile ~ Page 2 of 2
E-LINE T/S. @ 11,051' SLM. **LEFT TAG AND DIMEfVSIONS OF BAITSUB/OVERSHOT ON
WELI.** ***WELL LEFT S/I, NOTIFIED DSO OF WELL CONDITIONS AND FISH LEFT IN
HOLE****
AWGR_S. E-liB 05/23/2007 ***WSR CONTINUED FROM 5/22/2007*** (fish e-line toolstring) MADE SEVERAL ATTEMPS
TO FISH E-LINE TOOLSTRING WITH BRAIDED LINE. ****JOB STILL IN PROGRESS, WSR
CONTINUED ON S/24/2007****
AWGRS E-11B 05/22/2007 Assist S-Line fishing (Pre-CTD) Slickline able ko pull fish w/out pump. Released from jobsite
AWGRS E-11B 05/22/2007 TIO= 150/Z20/ 0 Assist SLB Slickline as directed Pump down Tubing 180.5 bbis crude
FWHP's = 300/260/0
AWGRS E-11B 05/22/2007 ***WSR CONTINUED FROM 5/21/2007*** (fish e-line toolstring) MADE SEVERAL ATTEMPTS
TO PULL E-LINE TOOLSTRING @ 10,053' SLM W/ .125 WIRE. ****JOB STILL PROGRE55,
WSR CONTINUED ON 5/23/2007****
AWGRS E-11B 05/21/2007 ***WELL WAS SHUT-IN ON ARRIVAL*** (pre ctd) CURRENTLY ATTEMPTING TO FISH OUT
E-LINE TOOLSTRING ****WAS CONTINUED ON 5/22/2007****
AWGRS E-11B 05/21/2007 T/I/0= 1300/260/0. (Pre-CTD) ASSIST E-LINE. Pump 290 bbfs of crude into the TBG. Final
WHP= 0/260/0.
AWGRS E-11B 05/21/2007 *****JOB CONTINUED FROM PREVIOUS DAY***** WELL SHUT IN ON ARRIVAL. INITIAL T/
I/ O= 1300/ 250/ 0. PULLED UP TO 11097.9'. ROTATED WPP TO 60 DEGREES WHICH WILL
PUT THE FACE OF THE WHIPSTOCK FACING TOPSIDE OF HOLE. CCL TO TOP OF WHIPSTOCK
= 14.1'. TOP OF WHIPSTOCK SET AT 11112'. PIP TAGS ARE AT 11120.6'. GOOD
INDICATION OF SET. UNABLE TO PUL~ OFF OF WHIPSTOCK, USE ERS, WPP TOOL LEFT IN
WELL TO BE FISHED. FISHING NECK IS 1-3/8" OTIS #2. FISHING HEAD SHOULD BE AT
APPROX 11085' MD. FINAL T/ I/ O= 0/ 250/ 0. WELL ~EFT SHUT IN. TURNED OVER TO
DSO. ***JOB COMPLETE***
A_.WGRS E-118 05/20/2007 *****WELL SHUT IN ON ARRIVAL. INITIAL T/ I/ O= 1300/250/0 PSI***** SET BAKER 4-
1/2" WHIPSTOCK @ 11112;. PULLED UP TO 11097.9'. ROTATED WPP TO 60 DEGREES WITH
FACE OF WHIPSTOCK FACING TOPSIDE OF HOLE. CCL TO TOP OF WHIPSTOCK = 14.1'. TOP
OF WHIPSTOCK SET AT 11112'. PIP TAGS ARE AT 11120.6'. GOOD INDICATION OF SET.
UNABLE TO PULL OFF OF WHIPSTOCK, USE ERS, WPP TOO~ LEFT IN WELL TO BE FISHED.
FISHING NECK IS 1-3/8" OTIS #2. FISHING HEAD SHOULD BE AT APPROX 11085' MD.
*****JOB CONTINUED ON 21-MAY-2007*****
AWGRS E-11B 05/13/2007 T/I/O = 1400/1400/0. MIT OA to 2000 psi. ( PASSED). MIT IA to 3500 psi. (PASSED)
Pumped 5 bbis 60/40 meth and 327 bbls crude down the IA before slickline set DGLV.
Pumped 6 bbls crude down the OA to achieve test pressure. Lost 140 psi in the ist 15 min
and 40 psi in the 2nd 15 min, for a total loss of 180 psi in 30 min. Bled back pressure.
Pumped an additional 36 bbis crude down the IA to achieve test pressure. Lost 160 psi in the
lst min and 60 psi in the 2nd 15 min, for a total loss of 220 psi in 30 min. Bled back
pressure. Freeze protect flowline w/ 5 bbls 60/40 meth. ~inal WHP's = 1450/120/0.
AWGRS E-11B 05/13/2007 ***CONT. FROM 5-12-07*** PULLED BK-LGLV FROM STA #3, SET 1" BK-DGLV IN STA #3
@ 4116'SLM. LRS IOADED IA W/300 BBLS. SET 1" BK-DGLV IN STA #2 @ 7560'SLM. MIT-
OA TO 2000 PSI, PASSED. MIT-IA TO 3500#, PASSED - SEE LRS DATA FOR DETAILS.
PULLED 4 1/2" X-LOCK CATCHER SUB FROM iQ,843 M.D. CATCHER - EMPTY. *** TRUN
WELL OVER TO DSO - LEFT WELL SHUT IN ***
AWGRS E-11B 05/12/2007 *** WELL SHUT IN PRIOR TO ARRIVAL *** SET 4 1/2" X-LOCK CATCHER SUB IN X-NIPPLE
@ 10843' MD, PULLED S/O VALVE FROM GLM @ 7560' MD ***CONT. ON 5/13/07***
A_W_ _G_RS E-11B OS/10/2007 ***WELL S/I ON ARRIVAL*** RAN 3.65" CENT, 2' X 1 7/8" STEM, 3J5" CENT, S-BAILER SD
@ 1230' SLM (TOOL COVERED IN PARAFFIN) RAN 2' X 1 7/8" STEM, 2.875" CENT, S-
BIALER, STOP @ 3000' AS PER BP REP RAN 2' X 1 7/8" STEM, 3.80" G-RING SD @ 2220'
SLM DUE TO SSSV NIPPLE RAN 3.65" CENT, 2' X 1 7/8" STEM, 3.75" CENT, S-BAILER, STOP
@ 11300' SLM AS PER PROGRAM RAN 4.5" GR, 3.70" DUMMY WHIPSTOCK STOP @ 11300'
SLM AS PER PRORAM ***WELL LEFT S/I ON DEPARTURE***
AWGRS E-11B 05/09/2007 T/IA/OA= 1650/1500/0 PPPOT-T (PASS) PPPOT-IC (PASS) (PRE CTD) PPPOT -T (PASS) RU
bled tool onto tubing head adapter, 50 psi bled to 0 psi. Pressured to 5000 psi for 30 minute
test, 4800/15 minutes, 4750/ 30 minutes. Bled THA void to 0 psi, RD test equipment re
installed Alemite cap. Cycled LDS "Standard" all moved no signs of bent or broke pins.
PPPOT-IC (PASS) Ru bled tool on to IC test void 0 psi on void flushed void untii clean
returns. Pressured to 3000 psi for 30 minute test, 2900/15 minutes, 2900/ 30 minutes. Bled
IC test void to 0 psi, RD test equipment re installed Atemite cap. Cycled LDS "Standard" all
moved free no bent or broke pins.
AWGRS E-11B 05/08/2007 T/I/O = 1470/1480/Vac. Temp = 5/I. TBG, IA & OA FLs (pre MITIA). TBG Fl @ 5425' (83
bbLs), IA FL @ 5557' (268 bbLs), OA FL @ 48' (3 bbLs).
http:/Idigitalwellfile.bpweb.bp.coin/WellEvents/Home/Default.aspx 7/31/2007
~ ~
BP EXPLORATION Page 1 of 16
` Operations Summary Report
Legal Well Name: E-11 i~ ~2
Common Well Name: E-11
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Spud Date: 8/20/1981
Start: 5/20/2007 End: 7/10/2007
Rig Release: 7/10/2007
Rig Number: N1
Date Frorn - To Hours Task Code NPT' Phase
6/22/2007 ~ 14:30 - 15:30 1.00 RIGD P ~ PRE
' 15:30 - 17:00 1.50 MOB P PRE
717:00 - 00:00 7.00 MOB P j PRE
6/23/2007 '00:00 - 04:30 4.50 MOB P I PRE
04:30 - 06:30 2.00 BOPSU P ~ PRE
06:30 - 11:30 I 5.001 BOPSUFI P I I PRE
~
i
i
' 11:30 - 11:45
.25
IGU
P ~
I
~
RE
~;11:45 - 14:15 2.50 RIGU P PRE
i 14:15 - 15:45 1.50 RIGU P ~ PRE
j 15:45 - 16:30 0.75 RIGU P PRE
i 16:30 - 17:25 0.92 RIGU P PRE
~ 17:25 - 18:45 1.33 BOPSU P i PRE
18:45 - 19:00 0.25 BOPSU P i PRE
19:00 - 20:00 1.00 BOPSU P I PRE
20:00 - 22:00 I 2.001 STWHIPI P ~ I W~X1T
22:00 - 22:15 0.25 STWHIP P WEXIT
22:15 - 23:00 0.75 STWHIP P WEXIT
23:00 - 00:00 1.00 STWHIP P WEXIT
6/24/2007 00:00 - 02:20 2.33 STWHIP P WEXIT
02:20 - 09:30 7.17 STWHIP P WEXIT
~-~ ~ ~ ~~
08:50 - 11:05 1 2.251 STWHIPI P I I WEXIT
11:05 - 12:15 I 1.171 STWHIPI P I I WEXIT
Description of Operations
Prep rig for rig move
Turnkey Rig Move, moved rig off 2-12 to front of pad entrance,
wait on security, 30 minutes
Turnkey Rig Move from 2-12 to E-11
Continue turnkey rig move from DS 2 to E pad.
Accept rig @ 04:30 hrs on 23-Jun-07. NU BOP stack. Prep
rig.
Test BOP's. 250 psi low, 3500 psi high(pipes, blinds, CT
packoff). 250 psi low, 2500 psi high (annular). Bob Noble w
AOGCC waived witnessing BOP test. Rig-up tiger tank and
hardline - PT to 4000 psi. PJSM for reel swap. Swap reels -
lower 2 3/8" e-free coil, PU 2 3/8" e-coil reel.
PJSM for pulling across coil and stabbing coil in injector.
Pull coil across and stab into injector. Load pits with 8.6ppg
2ppb 2% KCI brine.
Load coil with fluid. Perform slack management.
MU SLB dipple CTC, pull test to 35k#'s.
Re-head e-line.
Pull BPV with lubricator, LD and offioad BPV, lubricator and
bars
Pressure Test inner reel valve
Fluid end on pump #2 was changed out during rig move and
BOP test, tested to 4500psi.
Brk out and std bk injector, Megger E Line.OK (2000+ Meg
Ohms, & 46 Ohms continuity test), M/U BHI Upper quick
connect and prepare E-Line connection, Test electricai, OK.
Test SLB CTC to 4000 psi
PJSM, Review procedure, hazards and mitigation for M/U
window miliing assy, PU Baker toois to rig floor, MU Window
Milling Assy with a 3.80" diamond mill, reamer, Mtr, Coil Trak
tools, ~QC, UQC, X-O, CTC, Stab onto well and surface test
MWD, opened EDC
RIH to 3100'
RtH to 11100', displacing welt to Siozan miNing fluid, C1ose
EDC, Dn Wt 19.4k,
Up Wt 38.7k, Continue to RIH tag at 11125' and correct to
11112'.
Mill to 11119', 2.59/2.62 bpm @ 2870psi, 2600 psi = FS,
DWTP=5050 psi, DHAP=4418 psi, WOB .58 - 3.25k, IA 459psi,
OA 437psi, PVT 330bbis. Indications that mill was thru window
at 11,116' with drilling break, but progress slowed and motor
work increased shortly. Continue to time mill to 11,119' - 7.0'
past the pinch point - see drilling break again. Time mill to
11,120' - 8.0' below pinchpoint. Note window being m+lled in
perforated section of 4.5" liner. Assume that this is causing
abnormal milling characteristics.
Assume into formation. Drilling rate increased to keep steady
WOB. Drill 10' of formation. Circulate samples up to verify
with Geo.
PU and ream thru window with no noticeable motor work. Pass
down thru window with no noticeable motor work. Ream up
thru window again with same result. Run thru dry with no
bobbles on the weight indicator. Geo confirmed formation in
Printed: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 2 of 16
O~erations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
---~---
6/24/2007 11:05 - 12:15 ' 1.17 STWHIP P WEXIT samples. Circulate FloPro into hole prior to pulling
12:15 - 14:15 I 2.00 STWHIP P WEXIT POOH to PU build assembiy. Open EDC to reduce vibration
14:15 - 15:45 ~ 1.50 STWHIPI P
15:45 - 18:00 ~ 2.25 DRILL I P
18:00 - 21:10 I 3.17 ~ DRILL I P
W EXIT
PROD1
PROD1
21:10 - 00:00 I 2.831 DRILL I N I WAIT I PROD1
16/25/2007 I 00:00 - 00:15 I 0.25I DRILL I P I I PROD1
00:15 - 06:05 ~I 5.83 ~ DRILL ~ P ~ I PROD1
06:05 - 06:15 ' 0.17 DRILL P PROD1
06:15 - 06:30 0:25 DRILL P PROD1
06:30 - 06:45 0.25 DRILL P PROD1
06:45 - 11:00 4.25 DRILL P PROD1
11:00 - 11:25 0.42 DRILL P PROD1
11:25 - 13:30 2.08 DRILL P PROD1
13:30 - 14:00 I 0.50 ~ DRIIL ~ P ~ ~ PROD1
14:00 - 14:55 ~ 0.92 ~ DRILL ~ P ~ ~ PROD1
14:55 - 18:00 I 3.081 DRILL I P I I PROD1
while tripping OOH. Close EDC at surface. PJSM for
swapping BHA's prior to getting to surface.
LD window milling assembly. PU build assembly.
RIH to bottom. Bleed down IA - start 375 psi, down to 145 psi.
Bleed down OA - start 550 psi, down to 170 psi. Tag at 11144',
correct back to 11130'.
Drill to 11180', TF15L - HS, FS = 3300psi. 2.5bpm, _
3350-3600psi, 330 PTO, 1 k WOB, ROP 28 - 43fph
PVT = 326bb1s, Lost all returns, lost rate while circ at 2.3bpm
was 222bph, Ordered flo-pro mud from MI plant
POH to 11098', circ across the top of the hole, shut down
charge pump switch over to CT, opened the EDC, circ dn CT at
.33bpm, 176psi, with fuli returns at surface, PVT at 285bb1s,
shut down pumps, moniter well, breaking circ every 20 mins
thru EDC with full returns, IA 176psi, OA 365psi, waiting on 290
bbls of Flo-pro mud from MI, foliowed by 580bbis of 2 percent
double slick KCL from MI, note, Hot Water Plant is down, Hot
Oil is heat the fresh water at the hot water plant at a 1 bpm 120
degrees then traveling to MI to be mixed. Changed plans to let
MI mix KCL at plant with 60 - 80 degree fresh water stored at
their plant
RIH to btm, once KCL water arrived on locations, pumping at
1.64bpm, 2501 psi, no returns, PVT 285 - 267bb1s
Drild to 11330', TF at 4L, 2.2bpm, 3065psi, FS, 2.2bpm,
3365psi, ROP 17 - 33fph, WOB 1- 4k, started getting full
returns to pits at 11228', 02:00 hrs, Drlg with KCL water, FtOP
33fph
Wiper trip back to window.
Tie-in to GR. No correction needed. On depth.
RIH to bottom.
Drill build. FS = 1900psi, 2.50bpm. 50L-90L TFO. 2.50/2.50
bpm, 2200-2600psi, 2-5K WOB, 20-55fph ROP.
PVT = 337bb1s
Drilled to 11,480bb1s.
Wiper trip back to window.
Drill build. FS = 2040 - 3080 psi, 2.6 bpm. Increasing as the
hole was swapped from KCL to Flopro.
90L-115L TFO, 2.60 bpm/ 2.60 bpm, 2200-3300psi, 1.5-2.5k
WOB, 60-108fph ROP.
PVT = 335 bbls
Drilled to 11,630'.
W iper trip back to window.
Note: 9 ExxonMobil employees toured rig accompaied by WSL
and Alan Graf.
Drill buiid. FS = 2955 psi, 2.6 bpm. 2.60 bpm/ 2.60 bpm,
3200-3300 psi, 1.6-2k# WOB, 65-95fph ROP.
PVT = 334 bbls
iDrilled to 11,700'. Land build.
POOH for ~ateral assembly. Open EDC. PJSM for LD BHA
prior to getting to surface. Break-off lubricator 100' from
Printed: 7/242007 5:07:14 PM
~ ~
BP EXPLORATION'! Page 3 of 16
Operations Summary Re~ort
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
~
Date From - To Hours Task Code NPT Phase Description of Operations
--- , -- ---- - -- --
6/25/2007 14:55 - 18:00 i 3.08 DRILL P PROD1 surface and inspect coil visualiy.
18:00 - 18:30 j 0.50 DRILL P PROD1 POH, LD Drlg BHA #1
18:30 - 19:30 1.~0 BOPSU N SFAL PROD1 Inspecting biind shear rubbers, put door on upside down,
smashed index pin, no spares on location, Quadco to ship
tomorrow to slope
19:30 - 22:00 2.50 BOPSU N SFAL PROD1 Dressed off index pin with a die grinder to ailow engagement of
~ hole on ram door to be installed
22:00 - 00:00 ' 2.00 BOPSU N SFAL PROD1 Inspecting all ram bodies for missing rubber, the bottom 2 3/8"
combi pipe rams, found guide plate deformed and rubber
missing from seal, grinded down the guide plate to remove the
rams, damage was caused by closing rams on oversize pipe
' during koomey function test, found 3 1/2" test joint which is
believed to be what caused the damage to the 2 3/8" combi's
6/26/2007 00:00 - 01:30 I 1.50 BOPSU N SFAL PROD1 Continued to grinded down the guide plate to remove the btm
I rams, removed rams
01:30 - 02:00 i 0.50 BOPSU N SFAL PROD1 Waiting on Rams from Nordic 2
02:00 - 02:30 i 0.50 BOPSU N SFAL PROD1 Instailed 2 3/8" combi's
02:30 - 04:15 1 J5 BOPSU N SFAL PROD1 PJSM on testing BOP body and Btm rams, Body test BOP
I ~ stack, and btm 2 3/8" combi with 250 psi and 3500psi, RD test
jt
04:15 - 04:30 0.25 DRILL P PROD1 PJSM with PU Drlg Assy Coil Trak Tools
04:30 - 05:15 , 0.75 DRILL P PROD1 PU lateral drlg assy, BHA #3 w/ 1.2 deg mtr, RWD2ST043 BC
i I i bit, Coil Trak with RES, Orient MWD, LQC, UQC, MU SLB
CTC, stab injector
05:15 - 08:25 3.17 DRILL P PROD1 RIH with lateral drlg assy, BHA #3
08:25 - 09:15 0.83 DRILL P PROD1 MAD pass build section with resistivity upwards at 800fph.
09:15 - 09:45 0.50 DRILL P PROD1 Log GR to tie into depth. Correct -4'.
09:45 - 10:00 0.25 DRILL P PROD1 RIH to bottom.
10:00 - 10:45 0.75 DRILL P PROD1 Drill lateral. FS = 3000psi, 2.6bpm. 2.60bpm/2.60bpm,
3100-3300 psi, 2-5k WOB, 60-100fph ROP.
I Drilled to 11,749'.
PVT = 331 bbls
10:45 - 12:20 1.58 DRILL P PROD1 Coil stuck on bottom. Characteristics of differential sticking.
History of differential sticking in the SAG. Circulate BU. Let
hole reiax with pumps down for 15 minutes. Attempt to puli
free., Worked pipe free after 5 attempts of repeating above
step
12:20 - 13:45 1.42 DRILL P PROD1 Drill lateral to 11790', TF 80 to 45L, FS = 3000psi, 2.6bpm.
2.60bpm/2.60bpm, 3100-3300 psi, 2-5k WOB, 60-100fph ROP,
PVT = 331 327bb1s, Directional tool not working, not getting
clean surveys
13:45 - 17:00 3.25 DR~LL N DFAL PROD1 POH to lateral drlg assy, BHA #3
17:00 - 17:30 0.50 DRILL N DFAL PROD1 POH, ~D lateral drig assy, BHA #3
17:30 - 18:10 0.67 DRILL P PROD1 PJSM on CT chrome management procedures, Perform CT
management, cut off CTC, 106' of 2 3/8" CT. RD Hydraulic CT
cutter. Have 15434' of CT left on reel with 15826' of eline (2.5%
slack).
18:10 - 20:15 2.08 DRI~L P PROD1 Rehead & install S~B CTC. Puil test to 35k. Allow for 2.5' of
eline. M/U UQC & rehead eline. Conduct eline conductivity test
- OK. Meg eline - OK.
20:15 - 20:30 0.25 DRILL P PROD1 PJSM for M/U lateral BHA#4.
20:30 - 21:35 1.08 DRILL N DFAL PROD1 P/U lateral drilling BHA#4 with 1.2deg X-treme motor, BHI
HOT, USMPR, DGS, DPS, SBS, BCPM package and rerun
Printed: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 4 ofi 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date from - To Hours Task Code NPT~ Phase Description of Operations --
6/26/2007
20:30 - 21:35
1.08
DRI~L ~
N ~
DFAL !
PROD1
Hughes 3-3/4" x 4-1/8" RWD2ST bicenter bit #4. Scribe tools.
' M/U injector & Initialize/function test BHI tools.
21:35 - 23:30 1.92 DRILL N i DFAL ~ PROD1 RIH with drilling BHA#4 to 11130'.
23:30 - 00:00 0.50 DRILL N I DFAL i PROD1 Log down GR at 150fph & tie-into RA Pip tag. Correct CTD by
~ ! +4'.
'
6/27/2007 00:00 - 00:20 0.33 DRILL P PROD1 RIH with drilling BHA #4 to btm @ 11793
.
00:20 - 01:45 1.42 DRILL P PROD1 Drill to 11893' with 100-140L TF, 2.60/2.60bpm, 3000/3450psi,
1-2k DWOB, 10.06ppg ECD & 90fph ave ROP. PVT = 292bb1s;
j IAP = 185psi; OAP = 180psi; Freespin = 2.60bpm/3000psi; Up
wt = 42k. S/O wt = 15k. Observe maxed out RES readings.
01:45 - 02:30 0.75 DRILL P I~ PROD1 Drill to 11953' with 90L TF, 2.60/2.60bpm, 3000/3450psi, 1-2k
j ; DWOB, 10.1ppg ECD & 90fph ave ROP.
' 02:30 - 03:30 1.00 DRILL P ~ ~ PROD1 Wiper trip clean to window. RBIH clean to btm.
03:30 - 04:10 ' 0.67 DRILL P ' i PROD1 DriA to 12004' with 70-135L TF, 2.60/2.60bpm, 3000/3450psi,
~ 1-2k DWOB, 10.1ppg ECD & 90fph ave ROP. Stacking wt.
04:10 - 04:20 0.17 DRILL P i PROD1 Short 100' wiper.
04:20 - 05:50 1.50 DRILL P ~ PROD1 Drill to 12092' with 135L-135R TF, 2.60/2.60bpm,
I ', 3000/3450psi, 1-2k DWOB, 10.1ppg ECD & 10fph ave ROP.
~ Stacking wt.
05:50 - 06:25 0.58 DRILL ( P I I~ PROD1 Wiper trip to below window to 11130'
06:25 - 06:50 0.42 DRILL ~
P ~i PROD1 RIH to Btm, no hole problems
06:50 - 09:00 2.17 DRILL P i PROD1 Drill to 12250' with 135 - 109R TF, 2.52/2.52bpm,
i 3351/3318psi, 1-2k DWOB, 10.07ppg ECD & 100 - 115fph ave
ROP, IA 375psi, bled dn to 95psi, OA 759psi, bled dn to 132psi
09:00 - 10:25 1.42 DRILL P I I, PROD1 Wiper trip clean to window, tie-in to RA tag, correct +.5', RBIH
i ~i I dean to btm.
1025 - 12:35 2.17 DRILL P i ~ PROD1 Drill to 12400' with 159 - 100L TF, 2.52/2.52bpm,
3540/3486psi, FS 3115psi, 1-2k DWOB, 102ppg ECD &
! ' 103fph ave ROP, IA 153psi, OA 270psi, PV7 296bb1s, Loses
I started at 12335' at 30bpm
12:35 - 13:45 1.17 DRILL P PROD1 Wiper trip clean to window, RBIH clean to btm.
13:45 - 17:00 3.25 DRILL P PROD1 Drill to 12560' with 96 - 118L TF, 2.62/2.59bpm, 3790/3725psi,
2- 4k DWOB, 10.36 - 10.06ppge ECD & 50-85fph ave ROP, IA
177 - 160psi, OA 339 - 316psi, loses slow to 7bph, displacing
well to new Flo -Pro mud
17:00 - 18:10 1.17 DRILL P PROD1 Wiper trip clean to window, overpull at 11430' of 15k, RBIH
ciean to btm.
t8:10 - 21:10 3.00 DRILL P PROD1 Drill Shublik to 12670' with 50-90L TF, 2.55/2.55bpm,
3050/3400psi, 2-4k DWOB, 10.09ppg ECD & 40fph ave ROP.
~ PVT as @ 18:35Hrs = 297bb1s. PVT as @ 21:10Hrs = 284bbis.
i i Est net losses to formation =+/-4bbls/hr (excludinq new hole fill
21:10 - 21:35 0.42 DRILL P PROD1 Drill to 12700' with 90L TF, 2.55/2.55bpm, 3100/3500psi, 1-2k
DWOB, 10.12ppg ECD & 80fph ave ROP. Observe drilling
break @ 12672' - seems like we've faulted into the Sag.
21:35 - 23:00 1.42 DRILL P PROD1 Wiper trip to window. Had +/-20k O/pull & packoff from 12490'
to 12450' (Shublik). Make an additional down & up pass @
as-drilled TF to cleanout tight area. Continue wiping to window..
23:00 - 23:15 0.25 ORILL P PROD1 Log down GR at 150fph & tie-into RA Pip tag. Correct CTD by
+2'.
23:15 - 00:00 0.75 DRILL P PROD1 RBIH & set down 12450'. Drop pump rate & work thru tight spot
to 12540' with as-drilled TF.
6/28/2007 00:00 - 00:20 0.33 DRILL P PROD1 Make an additional up & down pass. Continue RIH to btm. PVT
Printed: 7/2472007 5:07:14 PM
~ ~
BP EXPLORATION Page 5-of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
-- - .~---
6/28/2007 00:00 - 00:20 0.33 DRILL P i PROD1 i- 263bb1s; IAP = 175psi; OAP = 360psi; Freespin =
2.60bpm/3200psi; Up wt = 43k. S/O wt = 15k.
00:20 - 02:30 2.17 DRILL P ', PROD1 ' Drili to 12821' with 90L TF, 2.55/2.55bpm, 3100/3500psi, 1-2k
DWOB, 10.2ppg ECD & 80fph ave ROP. Observe sparks &
i i ~ ', smoke coming out of SLB powerpack traction motor bearina_
02:30 - 02:45 0.25 DRILL N SFAL ', PROD1
02:45 - 03:35 0.83 DRILL N SFAL ~, PROD1
03:35 - 06:00 2.42 DRILL N SFAL ! PROD1
06:00 - 06:30 0.50 DRILL N SFAL '; PROD1
06:30 - 07:00 0.50 DRILL N SFAL ': PROD1
07:00 - 08:30 1.50 DRILL N SFAL PROD1
08:30 - 14:00 5.50 DRILL I N SFAL ', PROD1
~
14:00 - 17:30 I 3.501 DRILL I N I SFAL I PROD1
17:30 - 18:00 I 0.501 DRILL I N I SFAL ! PRODi
18:00 - 19:20 I 1.331 DRILL I N I SFAL I PROD1
Park bit @ 12768'. S/D powerpack & allow to cool down for
15mins. Meanwhile circ weil @ 2.5bpm/3100psi.
Gently creep out of hole into the window. Had +/-20k O/pull
across the Shublik. Temp of powerpack bearing = 120F.
Cannot open pipeshed roof with CT stabbed into injector.
Decide to POOH to surface.
Open up EDG & continue POOH with drilling BHA#4.
PJSM on LD BHA, unstab CT, spool back and secure to reel
Brk out injector, LD CoilTrak Assy, BHA #4
Cut off CTC, PJSM on puiling CT across pipeshed and
seciuring to reel, install internal grapple, pull test, pull across
pipeshed, secured to reel
PJSM on ND and removing power pack traction motor weighinc
3800 pounds with ali involved personnel, ND traction motor,
swapped out traction motor with 50 ton crane through opened
roof, NU traction motor, tested traction motor, checking out
mechanical and electricial power efficiencies, ok
PJSM for pulling across coil and stabbing coil in injector, Pull
coil across and stab into injector, calibrate CT pipe straighener,
MU S1.6 dipple CTC, puli test to 35k#'s, Re-head e-line,
Megger E Line.OK (2000+ Meg Ohms, & 46 Ohms continuity
test), M/U BHI Upper quick connect and prepare E-Line
connection, Test electrical, OK, Test SLB CTC to 4000 psi
CT reel house overhead bridge crane was turn on, offdriller's
side crane beam spooled down, sat on reel, back spooled
cable, shut down power, secured crane beam.
P/U lateral drilling BHA#5 with 1.2deg X-treme motor, BHI
HOT, USMPR, DGS, DPS, SBS, BCPM package and rerun
Hughes 3-3/4" x 4-1/8" RWD2ST bicenter bit #5. Scribe tools.
M/U injector & InitializeJfunction test BHI tools.
19:20 - 21:30 2.17 DRILL N SFAL PROD1
21:30 - 21:45 0.25 DRILL N SFAL PROD1
21:45 - 22:30 ~ OJ5 ~ DRILL ~ N ~ SFAL ~ PROD1
22:30 - 23:30 I 1.001 DRILL I N I DPRB I PROD1
23:30 - 00:00 I 0.501 DRILL I N I DPRB I PROD1
I6/29/2007 00:00 - 00:40 0.67 DRILL N DPRB PROD1
00:40 - 02:00 1.33 DRILL N DPRB PROD1
02:00 - 03:00 1.00 DRILL N DPRB PROD1
Meanwhile rectify bridge crane cable back-spooling.
RIH with drilling BHA#5 to 11130'.
Log down GR at 150fph & tie-into RA Pip tag. Correct CTD by
+3.5'.
RIH & set down from 12450'. Drop pump rate & work thru tight
spot to 12788' with as-drilied TF. Pump down 100bb1s of new
flopro mud downhole.
PUH with up to 40k O/pull & packing off @ 12535'. RBIH & set
down @ 12585'. Working string between 12535' & 12585' &
continue PUH with 10k O/pull to 12380'. RBIH & set down @
12477'. Work string several times but can't make it past 12477'.
Set tool to as drilled TF & wash down thru tight spot @
2.45bpm/3280psi & 180fph.
Continue washing down to 12487'. Can't wash past 12487'.
Wiper trip to window. RBIH & set down @ 12465'.
Work/wash down with as-drilled TF, 2.35bpm/3070psi &
Printed: 7/24/2007 5:07:74 PM
~ ~
BP EXPLORATION Page 6 of 16
Operations Surnmary Report
legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours I Task , Code I NPT I Phase Description of Operations
6/29/2007 ~ 02:00 - 03:00 ~ 1.00 ~ DRILL ~ N ~ DPRB ~ PROD1 I 105fph. Set down @ 12507'. P/U with 30k O/pull. Throw in the
03:00 - 05:00 2.00 DRILL N DPRB PROD1
05:00 - 06:15 1.25 DRILL N DPRB PROD1
06:15 - 09:00 2.75 DRILL N DPRB PROD1
09:00 - 09:25 0.42 DRILL N DPRB PROD1
09:25 - 09:45 0.33 BOPSU N DPRB PROD1
09:45 - 10:45 i 1.001 DRILL I N I DPRB I PROD1
10:45 - 13:30 ~ 2.75 ~ DRILL ~ N I DPRB ~ PRODi
13:30 - 14:00 0.50 DRILL N DPRB PROD1
I
14:00 - 16:45 I
2.75
DRILL
N
DPRB I
PROD1
16:45 - 17:00 0.25 ~ DRiLL N DPRB PROD1
17:00 - 17:30 0.50 DRILL N , DPRB PROD1
17:30 - 20:10
20:10 - 20:20
20:20 - 21:00
21:00 - 22:00
22:00 - 00:00
6/30/2007 00:00 - 01:00
2.67 DRILL N DPRB PROD1
0.17 DRILL N DPRB PROD1
0.671 DRILL ~ N I DPRB I PROD1
1.001 DRILL I N I DPRB I PROD1
2.001 DRILL I N I DPRB I PROD1
1.001 DRILL I N I DPRB I PROD1
01:00 - 02:00 1.00 DRILL N DPRB PROD1
02:00 - 03:40 1.67 DRiLL N DPRB PROD1
03:40 - 06:45 3.08 DRILL N DPRB PROD1
06:45 - 07:10 0.42 DRILL N DPRB PROD1
07:10 - 07:50 0.67 DRILL N DPRB PROD1
07:50 - 08:30 0.67 DRILL N DPRB PROD1
08:30 - 0930 1.00 DRILL N DPRB PROD1
09:30 - 10:00 I 0.50 ~ DRILL ~ N I DPRB ~ PROD1
towel & plan for OH AL W/S.
Wiper trip to window. RBIH to 12400'.
Sweep hole with 30bbls low-vis pill (2% KCL) & 30bbis hi-vis
pill.
POH to 11050', opened EDC, POH to BHA, Std blkm Injector
POH, LD Lateral Drilling Assy, BHA #5
PU GH Anchor with aluminum billet to rig floor, hang in derrick,
function test BOP's
PJSM on handling and running Baker tools, MU Aluminum
Billet OH Anchor assy, BHA #6, x-o's, HOT, DGS, DPS, EDC,
Powercomms, Wear Protector, LQC, UPC, CTC, stab injector
RIH to 11163' with AL Biilet OH Anchor Assy, BHA #6, at
11000' PU wt 43.3k, Dn wt 20.1 k, at 11130' to 11163' tied-in
to RA tag, +2' correction
Continued to RIH with AL Billet OH Anchor Assy to 12182', Top
of ~~,,,2,,~17,Q,,' ~~ resured up to 3900psi, set AL biliet to`~~
; set dn 34< before PU to release from AI Billet, ok
POH to OH Anchor running tool, BHA #6
POH, LD running tooi
MU Kick-Off Assy with a 1.8 deg mtr, HOT, DGS, DPS, EDC,
Powercomms, Wear Protector, LQC, UPC, CTC, stab injector
RIH with kick off assy, BHA #7 to 11130'.
Log down GR at 150fph & tie-into RA Pip tag. No CTD
correction.
RIH OHST BHA #7 to 12000'. Wt check => Up Wt = 42k, Down
Wt = 17k. Tag OH A~ whipstock with 2.6bpm/2900psi, 15L TF
@ 12170.7'. PVT = 249bb1s; IAP = 150psi; OAP = Opsi.
Ease into drilling from 12069'. Drill to 12170' with 15-30L TF,
2.6/2.6bpm, 2900/3000psi, 0.1k DWOB, 10.20ppg ECD, 0.5fph
ave ROP. Stall @ 12170.1'. P/U ease-in again from 12069.7'.
Drill & stall several times @ 12170.7' with 20-30L TF,
2.6/2.6bpm, 2900/3050psi, 1k DWOB, 10.20ppg ECD, 0.5fph
ave ROP. P/U, ease-in from 12069' & drill to 12171'.
Drili to 12176' with 25L TF, 2.6/2.6bpm, 2900/3100psi, 1 k
DWOB, 10.21ppg ECD, 5fph ave ROP.
Drill to 12191' with 45L TF, 2.6/2.6bpm, 2900/3180psi, 1 k
DW OB, 10.21 ppg ECD, 15fph ave ROP. C~tfam OMST
departure frr.~n NB incl survey o# 90.02degs ~ 1217d.34'.
Backream hole from 12191' to 12060' with 30L TF, 2.6/2.6bpm,
2900/3100psi and 40fph. RBIH to btm. Backream 2x again @
60L & 30R TFs. Drift well - looks clean.
POOH to S/T drilling BHA #7.
PJSM, POH, LD sidetrack drilling BHA #7
PJSM on CT chrome management procedures, Perform CT
management, cut off CTC, 100' of 2 3/8" CT. RD Hydraulic CT
I cutter. Have 15294' of CT left on reel with 15826' of eline (3.4%
slack).
Install SLB dipple CTC. Pull test to 35k
M/U UQC & rehead eline. Conduct eline conductivity test - OK.
Meg eline - OK, pressure tested CTC
PJSM for M/U lateral BHA #8, PU lateral drilling BHA #8 with
1.2deg X-treme motor, Hughes 3-3/4" x 4-1/8" RWD2ST BC
Printed: 7/24/2007 5:07:14 PM
~~ ~
BP EXPLORATION Page 7 of 16'
~~era#ions Summary Report
Legal Well Name: E-11
Common Well Name: E-11
Event Name: REENTER+COMP~ETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To Hours Task Code NPT
6/30/2007 09:30 - 10:00 0.50 DRILL j
i N DPRB
10:00 - 13:00 ! 3.00 ~
DRILL ~
I
N
DPRB
~
13:00 - 16:00 '', 3.00
I
i DRILL ' N DPRB
,
16:00 - 16:50 ~I 0.83
DRILL
N
DPRB
16:50 - 17:20 I 0.50 DRILL ~ N DPRB
17:20 - 18:40 I~ 1.33
i DRILL i N DPRB
18:40 - 20:30 !~ 1.83 DRILL N DPRB
j
I I
!
20:30 - 22:00 : 1.50
~ ~
DRILL ~
N
DPRB
i ~
,
22:00 - 00:00 ~ 2.00 DRILL j
~ N STUC
7/1/2007 00:00 - 00:15 i 0.25 DRILL I N STUC
00:15 - 01:45 I 1.50 DRILL N DPRB
01:45 - 02:15 i 0.50 DRILL N DPRB
02:15 - 04:30 '~ 2.25
~
~
i
I
I
I DRILL N
I
i DPRB
04:30 - 07:30 I 3.001 DRILL I N
07:30 - 08:00 ~ 0.50 ~ DRILL ~ N
Spud Date: 8/20/1981
Start: 5/20/2007 End: 7/10l2007
Rig Release: 7/10/2007
Rig Number: N1
Phase Description of Operations
PROD1 bit #7, BHI HOT, USMPR, DGS, DPS, SBS, BCPM package,
Scribe tools, M/U injector & Initialize/function test BHI tools
PROD1 RIH with driliing BHA #8 to 12191', at 11130' log down , tie-into
RA Pip tag, Corrected Baker depth by -1'
PROD1 Drilled to 12350', TF 104~ - 12.8L, 2.61/2.61bpm, 3237psi,
WOB 1-2k, ROP 60 - 80fph, ECD 10.18 ppg, IA 255psi, OA
264psi, displaced well to new Flo-Pro mud
PROD1 Wiper trip to below window at 11130', slight bobble at 12168'
PROD1 RBIH to btm, slight bobble at 11435'
PROD1 Drilled to 12504', TF 90-110L, 2.54/2.54bpm, 3354psi, WOB
1-2k, ROP 100 -160fph, ECD 9.98ppg, IA 226psi, OA 193psi
PROD1 Wiper trip to window. Had 5k O/pull across OHW/S. RB{H to
btm with slight bobble across 11460' & OHW/S. PVT =
210bb1s; IAP = 220psi; OAP = 180psi; Freespin =
2.60bpm/3100psi; Up wt = 43k. S/O wt = 16k.
PROD1 Drill to 12635' with 110-135R TF, 2.6/2.6bpm, 3100/3350psi,
1-2k DWOB, 10.04ppg ECD, 115fph ave ROP. Get
differentially stuck.
PROD1 CBU. S/D pumps for 15mins & allow ECD to drop to 8.44ppg.
Attempt to work pipe free between -10k & 90k without luck. Call
for crude. Meanwhile re-CBU.
PROD1 S/D pump for 15mins. Work pipe & puli free.
PROD1 Wiper trip to window. Had slight wt bobble across OHW/S.
PROD1 Log down GR at 150fph & tie-into RA Pip tag. Add 6.5' to CTD.
PROD1 RBIH & set down @ 11460' with as drilled TF of 90L. PlU,
RBIH & set down several times @ 11460' (Shublik/Sag
interface). Attempt to poke thru possible ledge without luck.
Attempt to wash down thru ledge @ min rate - no luck. Wash
down with 1.8bpm/2400psi & 170fph to 11470' & not able to fall
into old old. Poke around more & still not getting lucky.
Continue washing down while PJU & RBIH @ intervals - can't
find old hole (risk possible sidetrack). Wash down to 11519'.
Observe 2degs angle build up via NBincl.
DPRB I PROD1
DPRB I PROD1
08:00 - 09:00 1.00 DRiLL N DPRB PRODi
09:00 - 11:15 ~ 2.25 DRILL N DPRB PROD1
11:15 - 11:30 025 DRILL N DPRB PROD1
11:30 - 11:40 0.17 DRILL N DPRB PROD1
11:40 - 13:55 I 2.251 DRILL I N I DPRB I PROD1
Review situation with ODE & decide to attempt to find the old
hole with a 3.8deg bend motor & if not successful set a 3-3/16"
intermediate Inr.
POOH lateral BHA#8. Observe slight O/pull @ 10947' (ZXP
LTP?)
PJSM on handling and LD BHA, POH with BHA #8, LD mtr, bit,
resistivity tool, Bit grade 1-1, 2 poRs plugged, one with
formation, one with motor rubber
PJSM on PU BHA #9, PU 3.8 mtr, bit, HOT, rotate thru stack,
MU DGS, DPS, EDC, Powercomms, Wear Protection Sub,
LQC, UPC, CTC, install Injector
RIH to 11120' with drlg BHA #9, at 11000', up wt 44k, dn wt 18k
Tie-+n pass f( 11120' to 11149', CT correction of -16.3'
RIH to 11520', keeping TF oriented to drilled hole, .52bpm,
1520psi, dn wt 16k,
Many attempts to follow old hole, working CT from 11400' to
11520' with a range of TF's from SO - 138L, 3.6 to 12fpm, .50 -
1.98bpm, 625 - 2556psi, slight bobble POH at 11460', no
bobbles RIH to 11520', Orient TF to 145L, set dn at 11446',
Printed: 7724/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 8 of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code' NPT Phase Description of Operations
_
,7/1/2007 11:40 - 13:55 _
2.251~ DRILL I N DPRB PROD1 attempt to work thru, no go, orient TF to 100L, worked past
' ! 11446' to 11520', made a couple more run past 11446' to
' 11520', TF 80L, slight bobbles at 11446'
13:55 - 15:50 1.92 ~ DRILL ~
~ N DPRB PROD1 POH to BHA #9
15:50 - 16:30 , 0.67 DRILL N DPRB PROD1 PJSM on handling BHA, POH with BHA #9, LD bit andmotor
16:30 - 18:20 ~ 1.83 DRILL N DPRB PROD1 PJSM on handling and running 3 3/16" liner, PU round nose AL
j shoe, 14 Jts of 3 3/16", 6.2#, L-80, TC11, 12 with
~ cementralizers, 2 without cementralizers, X-O to 3 1/2" STL,
Deployment sleeve, HR 4" GS spear, Baker loc first 5 jts
18:20 - 19:30 1.17 ~ DRI~L N DPRB PROD1 MU the rest of the Liner assy, BHA # 10 with x-o, blind sub,
i ~,
~ DGS, DPS, EDC, Powercomms, Wear Protection Sub, LQC,
~
19:30 - 22:00 ~
2.50 ~I
DRILL
N I
DPRB
PROD1 UPC, CTC, install Injector
RIH with 3-3/16" liner without circ. to 11080'.
22:00 - 22:30 I 0.50; DRILL I N I DPRB I PROD1
22:30 - 22:45 i 0.25I DRILL I N I DPRB I PROD1
22:45 - 00:00 I 1.25 ~ DRILL I N I DPRB I PROD1
7/2/2007 00:00 - 01:30 ; 1.50 DRILL N DPRB PROD1
01:30 - 01:45 ~ 0.25 DRILL N DPRB PROD1
01:45 - 02:30 0.75 DRILL ~ N DPRB PROD1
02:30 - 03:00 0.50 DRILL ~ N DPRB I PROD1
03:00 - 03:15 0.25 DRILL N DPRB PROD1
03:15 - 04:30 1.25 DRILL N OPRB PROD1
Meanwhile R/U N2 pumpers.
Log down GR at 100fph & tie-into formation GR marker.
Subtract 10' from CTD.
Continue RIH smoothly @ 30fpm thru OH. Tag TD @ 11515'.
P/U @ 44k & retag TD @ same depth. Set down 10k down on
GS spear. Establish circ @ 0.94/0.80bpm & 1850psi. Increase
rate to 1.4bpm & 2350psi. P/U while pumping @ 36k. S/D
pump. PUH without pumping @ 40k & confirm release from Inr.
POOH with Inr running BHA#10 while diluting cire sytem with
2% KCL with 10ppb K-G & 3% L-T for slim hole drilling.
Continue POOH with Inr running BHA#10.
PJSM for UD Inr running BHA#10.
Flush BHA with water & air. UD Inr running BHA#10.
Boot end of e-line. M/U side jet nozzle to CTC & stab injector
on well. Shut in swab.
PJSM for B/D CT with N2.
Pump 15bbls bleach, 60bbls freshwater, 15bbls A261 inhibitor
& 10bbls MeOH spacer ahead.
04:30 - 05:30 1.00 DRILL N DPRB PROD1
05:30 - 06:30 1.00 DRILL N DPRB PROD1
06:30 - 08:15 ~ 1.75 ~ DRILL ~ N ~ DPRB ~ PROD1
08:15 - 08:30 I 0.251 DRILL I N I DPRB I PROD1
08:30 - 09:30 I 1.001 DRILL I N I DPRB I PROD1
1~0:00- 11~:30 1~.50 BOPSURN DPRB PROD1
11:30 - 14:45 I 3.251 DRILL I N I DPRB I PROD1
14:45 - 16:15 I 1.50 ~ ORILL ~ N I DPRB I PROD1
Meanwhile P/T N2 lines - OK.
Blow down CT with N2 & bleed down.
P/U injector & cut off CTC. R/D stripper assy. Prep end of CT
for internal grapple. Slip grapple connector into CT, M/U & pull
test.
PJSM on pulling CT across, Pulled CT across, secured to reel,
RD hardline while changing out 2 3/8" combi's to 2" combi's
PJSM with all involved personnel on reel swap operations,
assignments, communication and securing area.
Perform a trial run with bridge crane and reel to ground and
back, no problems, Swapped out 2 3/8" e-coil to 2" e-coil
NU reel to reel bushing hubs, RU hardline
,Pressure Test, LEL alarms, body test, 2" combi rams, 250 -
3500psi, John Crisp with AOGCC witnessed test, LEL, H2S
alarms triggered a visual and audible alarm at low level,
electrician repaired same, with the alarms showing a visual on
low and a visual/audible on high
Change out stripper blocks to 2", cleaned up and installed
injector chain guards, cleaned up floor
Install internal grapple, PJSM with crew on operational
Printed: 7724/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 9 of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code i NPT Phase Description of Opera#ions
~-
7/2/2007 14:45 - 16:15 1.50 DRILL N ~I DPRB ' PROD1 procedures for pulling coil across, pull test, Pulled CT across,
; stab injector
16:15 - 17:45 1.50 DRILL N j DPRB i PROD1 Install stuffing box, changed and stabbed stuffing box
' ' I pack-offs. Adjust rollers for 2" CT.
17:45 - 18:00 0.25 DRILL N ~I DPRB ', PROD1 Fill CT with 30bbis of Flo-Pro mud. P/test inner reel valve.
18:00 - 18:15 025 DRILL N I DPRB ! PROD1 Held PJSM for pumping eline slack management.
18:15 - 22:15 4.00 DRILL N i SFAL ! PROD1 Reverse circ 80bbls of mud @ 3.2-2bpm/4050psi. Could not
I ~, hear any audible sound of cabie movement. Stop pumping. P/U
injector & observe that e-ine cable did not move. Transfer KCL
I water from upright tank. Retry slack management with 150bb1s
~ of KCL @ 4.2-2.8bpm/4500psi, stopping & restarting pumps @
I ', 25bbls intervals. Could not still hear any audible sound of cable
' ~,
~ movement. P/U injector & observe that e-line cable stiil did not
I move.
22:15 - 00:00 1.75 DRILL N i SFAL : PROD1 R/U hydraulic cutter. Cut 45' of CT & eline & adjust pipe
~ I~ , straightener. Discover that e-line had a bird nest @ about 10'
~ ~I ' from end of CT. R/D hydraulic cutter. Repeat slack
~
I management with 20bbls of KCL water & was not still able to
'
of eline-CT left on reel.
move the eline (Give Up!). Have 14476
7/3/2007 00:00 - 02:15 2.25 DRILL N ~ DPRB PROD1 Rehead & install SLB CTC. Pull test to 35k. Ailow for 2.5' of
~ ~I ' eline. M/U UQC & rehead eline. Conduct eline conductivity test
' OK. Meg eline - OK. P/Test CTC & UQC to 3500psi.
02:15 - 02:45 0.50 DRILL N ~; DPRB i PROD1 I Pump one CT vol back into the reel in normal circ mode @
; 1.9bpm/2400psi to complete slack management.
02:45 - 03:00 0.25 DRI~L N i DPRB '•, PROD1 Held PJSM with new Nordic crew. Review well status, potential
~ , hazards & miliing BHA M/U procedures.
03:00 - 04:00 1.00 DRILL N DPRB I PROD1 M/U shoe miilout BHA #11 with a 2.74" HC D331 miil, 2.73"
diamond string reamer, BOT straight Xtreme motor, BHI
i Coiltrack DGS, DPS, EDC, P&C, SWP & LQC. M/U injector &
i Initialize/funciion test BHI tools.
04:00 - 06:30 2.50 DRILL N DPRB ~ PROD1 RIH with shoe millout BHA #11 to 11105'
06:30 - 06:50 0.33 DRILL N DPRB PRODi Tie-in pass to 11135', CT correction of -7.8'
06:50 - 07:10 0.33 DRILL N DPRB PRODi RIH tagged at 11514.45', up wt 32.2k at 11500', dn wt 15.3k,
PVT 296bbis
07:10 - 08:20 1.17 DRIL~ N DPRB PROD1 Miiled AL shoe cap, drill 10' of formation to 11525', wash and
ream 2x
08:20 - 11:00 2.67 DRILL N DPRB I PROD1 POH to milling BHA #11, brk out, puil bk injector
11:00 - 11:15 0,25 DRILL N DPRB ~ PROD1 POH, LD milling assy, BHA #11, mill and reamer gauge ok
11:15 - 12:00 0.75 ORILL N DPRB ~ PROD1 PJSM on PU, handling BHA, MU Build assy, BHA #12 with
' 2.6deg motor & rebuilt HYC bicenter bit.
12:00 - 14:30 2.50 DRILL N DPRB PROD1 RIH with drilling BHA#12 to 11110'.
14:30 - 14:50 0.33 DRILL N DPRB i PROD1 Log down GR at 150fph & tie-into RA Pip tag. Correct CTD by
~ -7' & BHI by +9'.
14:50 - 15:10 0.33 DRILL N DPRB PROD1 RIH with drilling BHA#12 to btm tagged @ 11525'. PVT =
290bb1s; IAP = 160psi; OAP = Opsi; Freespin =
1.60bpm/2700psi; Up wt = 31 k. S/O wt = 16k.
15:10 - 15:40 0.50 DRILL N DPRB PROD1 Drill build/turn to 11573' with 170L TF, 1.6/1.6bpm,
2700/3000psi, 2k DWOB, 9.41ppg ECD, 90fph ave ROP.
15:40 - 16:25 0.75 DRILL N DPRB PROD1 Drill build/turn to 11634' with 90-95L TF, 1.6/1.6bpm,
2700/3100psi, 2k DWOB, 9.41ppg ECD, 85fph ave ROP.
16:25 - 17:10 0.75 DRILL N DPRB PROD1 Drill build/turn to 11700' with 70l TF, 1.6/1.6bpm,
2700/3200psi, 2k DWOB, 9.41ppg ECD, 85fph ave ROP.
17:10 - 18:00 0.83 DRILL N DPRB PROD1 Wiper trip to TOL with minor bobbles @ the 3-3/16" shoe. RBIH
Pn~tetl: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 10 of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours I Task Code NPT Phase ~ Description of Operations
7/3/2007 ~ 17:10 - 18:00 I 0.831 DRILL ~ N ~ DPRB I PROD1 ;& tag 3x @ 11516' (3-3/16" shoe) with 170L TF. Work pipe &
18:00 - 19:45 I 1.75I DRILL ~ N I DPRB I PROD1
19:45 - 20:15 0.50 DRILL ~ N DPRB ; PROD1
20:15 - 21:00 OJ5 DRILL I N DPRB I PROD1
21:00 - 00:00 I 3.001 DRILL I N I DPRB I PROD1
17/4/2007 I 00:00 - 01:15 I 1.251 DRILL I N I DPRB i PROD1
01:15 - 03:30 I 2251 DRILL I N I DPRB i PROD1
03:30 - 03:50 ~ 0.33 DRILL I N DPRB I PROD1
03:50 - 04:15 ~ 0.42 DRILL N DPRB I PROD1
04:15 - 06:00 i 1.75 DRILL N I DPRB ~ PROD1
06:00 - 07:00 1.00 DRILL N DPRB ' PROD1
07:00 - 08:40 I 1.67 DRIL~ N DPRB I PROD1
08:40 - 09:40 1.00 DRILL ( N DPRB PROD1
09:40 - 10:50 1.17 DRILL I N DPRB PROD1
10:50 - 11:30 0.67 DRILL N DPRB PROD1
11:30 - 11:40 0.17 DRILL N DPRB PROD1
11:40 - 12:00 0.33 DRILL N DPRB PROD1
12:00 - 13:15 1.25 DRILL N DPRB PROD1
13:15 - 15:15 I 2.001 DRILL I N I DPRB I PROD1
15:15 - 15:30 I 0.251 DRILL I N I DPRB I PROD1
15:30 - 16:30 ~ 1.00 ~ DRILL ~ N ~ DPRB ~ PROD1
16:30 - 18:10 I 1.671 DRILL I N I DPRB I PROD1
finally bounce thru into OH.
~I Driil build/turn with 70L TF, 1.6/1.6bpm, 2700/2900psi, 2k
' DWOB, 9.6 ppg ECD, 80fph ave ROP. Orilled to 11846'.
', wiper trip to window. Ciean hole. 31 K up wt. RIH to bottom.
I Drill build / turn, 1.6 bpm, 2720-3300 psi, 80l TF, 90.6 deg
' incl, 80 fph, 9.6 ecd.
Drilled to 11904'.
! POH for lateral BHA. Had 5K overpull at bottom of drilling liner
~ at 11515'. Puil free and Open EDC.
' POH.
I, Check bit, bit OK, {1,1,1). Adjust motor to 1.2 deg and check
', orientation. Check tools.
i OAL = 58.18'.
~ RIH with lateral BHA #13 with 1.2 deg motor and HYC BC Bit
' #11. Circ at min rate.
~ Log tie-in at RA tag, add 4' to CTD.
RIH, tag bottom at 11906'.
Drill lateral, 1.6 bpm, 2660-3300 psi, 120L, 90 deg incl, 90
'; fph, 9.6 ecd.
~ Drilled to 12,050'. PVT = 281 bbis; IAP = 200psi; OAP = Opsi;
~I Freespin = 1.60bpm/2700psi; Up wt = 31 k. S/O wt = 13k.
~, W iper trip clean to TOL RBIH with 90L TF & tag @ 11516'
'(3-3/16" shoe/formation lip). Orient to 120L & bounce thru into
II OH. RBIH to btm.
~ Drill to 12200' with 90-100L TF, 1.6/1.6bpm, 2700/3150psi, 2k
i DWOB, 9J3ppg ECD, 95fph ave ROP.
~ Wiper trip clean to TOL. RBIH clean to btm with 120L TF.
~ Drill to 12354' with 30-90L TF, 1.6/1.6bpm, 2800/3250psi, 2k
DWOB, 9.75ppg ECD, 130fph ave ROP.
W iper trip clean to TOL.
Log down GR at 125fph & tie-into RA Pip tag. Correct CTD &
BHI by +2'.
RBIH clean to btm with 120L TF.
Drill to 12500' with 90-100L TF, 1.6/0.85-1.07bpm,
2800J3250psi, 2k DWOB, 9.80ppg ECD, 120fph ave ROP.
' Start getting 48% losses (35bph) from 12370'.
W iper trip clean to TOL. RBIH with 120L TF & tag @ 11516',
11520' & 11530'. Looks like we knocked off something & are
pushing it downhole. Attempt unsuccessfully to RIH several
times @ 170L, 160L, 145L, 120L, 90L & 45L TFs. Poke thru @
HS TF & finally shake off/lose whatever we're pushing down @
11550'. PUH clean to 11515'. Continue RIH clean to btm.
Drill to 12533' with 90L TF, 1.6/1.15bpm, 2800/3250psi, 2k
DWOB, 9.84ppg ECD, 125fph ave ROP. Still having 35bph
dynamic losses.
Drill to 12655' with 90R TF, 1.6/1.15bpm, 2800/3250psi, 2k
DWOB, 9.84ppg ECD, 125fph ave ROP. Still having 35bph
dynamic losses.
W iper trip. Backream & PUH @ 50fph thru the 3-3/16" shoe.
Saw motor work @ 11515'. RBIH & PUH again with no motor
work. Continue wiping to TOL. RBIH clean to btm with 120L
TF.
Pri~ted: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 11 of 16 -
Operatio'ns Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
__
7/4/2007 ~ - ----
18:10 - 19:50 ~i 1.67 DRILL N DPRB PROD1 --
Drill lateral, 1 J bpm, 1.3 bpm returns, 2970 - 3400 psi, 90L
I ~ TF, 9.6 ecd, 1-2K WOB, 90 fph,
Drilled to 12800'.
19:50 - 21:00 1.17 DRILL P PROD1 Wiper trip to 11,130'. Clean entry into drilling liner.
~ 21:00 - 21:30 I~ 0.50 DRILL P PROD1 ~ Log GR tie-in at RA tag. Added 2' to CTD.
21:30 - 22:15 I 0.75 DRILL P PROD1 RIH, clean exit out drilling liner. RIH clean to bottom.
22:15 - 00:00 ~~ 1.75 ORILL P PROD1 Drill lateral, 1 J bpm, 1.4 bpm returns, 3100 - 3500 psi,
70-90L TF, 90 fph, 1-2K WOB, 90 deg incl, 9.6 ecd, Drilled
to 12,935'.
'i Held Kick drill.
7/5/2007 00:00 - 01:30 ', 1.50 DRILL P PROD1 ~ Wiper trip to Drilling liner. Clean hole. RIH clean to bottom.
i 01:30 - 02:15 ', 0.75 DRILL P PROD1 I Drill lateral, 1 J bpm, 1.3 bpm returns, 3200-3500 psi, 100L
i TF, 90 deg incl, 1-2K WOB, 90 fph,
' Drilled to 13020'. Orient to right side.
02:15 - 03:00 'i 0.75 DRILL P PROD1 Drill lateral, 1.7 bpm, 1.3 bpm returns, 3200-3500 psi, 90R
', TF, 90 deg incl, 1-2K WOB, 90 fph,
I I Drilled to 13,080'.
03:00 - 04:40 ' 1.67 DRILL P PROD1 i Wiper trip to Drilling liner, Clean hole, RIH clean to bottom.
1
I 04:40 - 06:00 ~~ 1.33 DRILL P PROD1 I Drill lateral, 1.8 bpm, 1.4 bpm returns, 3200-3600 psi, 100 R
TF, 90 deg incl, 1-2K wob, 97 ecd,
Drilled to 13,194'.
06:00 - 06:30 ', 0.50 ~ DRILL P PROD1 Drill to 13235' with 90R TF, 1.67/1.40bpm, 2800/3250psi, 1.5k
,
I DWOB, 9.63ppg ECD, 105fph ave ROP.
06:30 - 07:30
I
1.00 DRI~L P PROD1 ~ Wiper trip clean to TOL.
I
07:30 - 07:40 i 0.17 DRILL P PROD1 i Log down GR at 145fph & tie-into RA Pip tag. Correct CTD &
~ BHI by +4'.
07:40 - 08:15 ; 0.58 DRILL P PROD1 RBIH clean to btm. PVT = 284bb1s; IAP = 180psi; OAP = Opsi;
i I Freespin = 1.60bpm/2700psi; Up wt = 33k. S/O wt = 12k.
08:15 - 08:45 ~~, 0.50 ~ DRILL P PROD1 Drill to 13281' with 120-150R TF, 1.60/1.35bpm, 2700/3050psi,
7k CT wt, 5k SWOB, 1.5k DWOB, 9.65ppg ECD, 120fph ave
ROP.
08:45 - 08:50 0.08 DRILL P PROD1 Short BHA wiper.
08:50 - 09:25 0.58 DRILL P PROD1 Drill to original planned TD of 13350' with 120-150R TF,
i 1.60/1.35bpm, 2700/3100psi, 6.5k CT wt, 5.5k SWOB, 1.5k
DWOB, 9.65ppg ECD, 120fph ave ROP.
Meanwhile held a spill drill with crew. Held an AAR & further
review spili prevention, controi & countermeasure procedures.
09:25 - 09:50 0.42 DRILL P PROD1 Drill to 13400' with 120-150R TF, 1.60/1.35bpm, 2700/3150psi,
6k CT wt, 6k SWOB, 1.5k DWOB, 9.65ppg ECD, 120fph ave
~ ROP.
09:50 - 11:40 1.83 DRILL P PROD1 Wiper trip clean to TOL. RBIH clean to btm.
11:40 - 13:05 1.42 DRILL P PROD1 Drill to 13522' with 90-120R TF, 1.60/1.40bpm, 2700/3150psi,
4k CT wt, 8k SWOB, 1.5k DWOB, 9.77ppg ECD, 120fph ave
ROP. Stacking wt.
13:05 - 13:15 0.17 DRILL P PROD1 Short 200' wiper.
13:15 - 13:35 0.33 DRILL P PROD1 Drill to 13551' with 90-120R TF, 1.70/1.45bpm, 2800/3250psi,
6k CT wt, 6k SWOB, 1.5k DWOB, 9.85ppg ECD, 120fph ave
ROP. Stacking wt. Geos call TD.
13:35 - 15:50 2.25 DRILL P PROD1 Wiper trip with 120L TF. Saw motor work & minor O/pull from
11515' to 11475' like we're dragging something up hole. Stop
PUH. RBIH clean to 11700' to shake off whatever we're
dragging up. PUH again & observe no motor work or O/pull.
Printed: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page ~2 ofi ~6'
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date Frorn - To Hours Task Code NPT Phase . Description of Operations
~
--- ,--- ---
7/5/2007 13:35 - 15:50 ~ 2.25 ~ DRILL P ~ PROD1 Continue wiping clean to TO~. RBIH clean to btm with 120L
15:50 - 16:05
16:05 - 17:25
17:25 - 20:30
20:30 - 20:45
20:45 - 21:30
21:30 - 00:00
17/6/2007 I 00:00 - 01:30
01:30 - 03:30
03:30 - 04:40
i
0.25 !' ORILL P
,
1.33~~ DRILL P
3.08 ~! DRILL P
0.25 i DRILL P
0.75'I DRILL P
2.50' CASE P
1.50 i CASE P
i
' i
~
2.00 I CASE i P
1.17! CASE P
04:40 - 05:00 0.331 CASE P
III
I
i
05:00 - 07:00 2.00 i CASE P
07:00 - 07:45 0.75 CASE P
07:45 - 08:00 0.25 CASE P
08:00 - 08:45 0.75 CASE P
08:45 - 09:15 0.50 CASE P
09:15 - 10:00 I OJ51 CASE I P
TF.
PROD1 Log down GR at 145fph & tie-into RA Pip tag. Correct CTD by
+2' & BHI by -1'.
PROD1 RIH clean to btm tagged 2x @ 13,547'.
PROD1 POOH with drilling BHA#13 while laying bead Inr pill in OH.
Paint EOP flags @ 11500' & 9000'.
PROD1 SAFEI'Y MEETING. Review procedure, hazards and
mitigation for laying out drilling BHA and running iiner.
PROD1 Lay out drilling BHA. Bit graded at (1,1,1).
RUNPRD M/U Indexing guide shoe, 1 jt solid and 58 Jts, Pre-Drilled,
2-3/8", STL, 4.7#, L-80 liner as per program.
50 jts made up by midnight.
RUNPRD M/U 2-3/8" Pre-Drilled STL liner.
M/U BTT AL Billet and AL depioyment sleeve.
M/U BHI tools. Liner and running tools total length = 1,901.34'.
Liner total length = 1,861.24'.
RUNPRD RIH with 2-3/8" Pre-Drilled liner at 80 fph. Circ. at 0.2 bpm
Correct to flag at 9000' EOP. -12'.
Up wt = 34.5K at 10,900'.
RUNPRD Exit drilling liner clean with no wt loss. RIH with 0.2 bpm, 900
psi.
14K dwn wt at 12000'. Sat down at 12,985'. Pull free at 55K.
Circ and pull up hole,
~ dragging something up, slowly getting better. up wt 40K at
' 12600'.
Deployment sleeve = 2.70" OD. Min. ID of 3-3/16" liner at top
= 2.786". very tight clearance.
POH to 12400'. overpull cleaned up at 12450'. Circ at .75
bpm.
RIH again. RIH clean, sat down at 12972'. Clean pick up,
38K.
RIH clean past tight spot. Dwn wt = 10K at 13100'.
Lower flag was 1 ft shallow. RIH with 10K dwn wt at 13450'.
Sat down at TD at 13541'. Up wt = 40K. Sat down at same
depth 2 more times.
Liner is landed at TD 13,547' corrected depth.
RUNPRD Stack 10K down on liner. Pump at 1.8 bpm, 3800 psi, Pick up
40K up wt.
Set down again. Stack 10K. Circ. 2.0 bpm, 4400 psi, Pick
up, still have liner.
RIH. stack wt. circ at 2 bpm, 4500 psi, Pick up, still have it.
RIH, stack -5K wt down.
Pick up fast with max pump. Left liner at TD. Up wt = 32K.
RUNPRD Pull back thru bottom of drilling liner clean. 33K up wt.
POH. Top of 2-3/8" liner at 11 685'. Circ. 0.8 bpm, 0.5 bpm
returns.
RUNPRD Continue POOH with Inr running BHA#14.
RUNPRD PJSM for L/D Inr running BHA#14.
RUNPRD UD Inr running BHA#14.
RUNPRD R/U hydraulic cutter. Cut 100' of CT & eline for chrome pipe
management. Have 14376' of eline-CT left on reel.
RUNPRD Rehead & install SLB CTC. Pull test to 35k. Allow for 2.5' of
Printed: 7/24/2007 5:07:14 PM
~ ~
~~`
BR EXPLORATION Page 13 of 16
Operations Summary I~eport
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours~Task Code NPT Phase~ Description of Operations
7/6/2007 09:15 - 10:00 0.75 ~ CASE i P ~ I RUNPRD eline. M/U UQC & rehead eline. Conduct eline conductivity test
~ I ( - OK. Meg eline - OK. P/Tesi CTC & UQC to 3500psi.
10:00 - 10:15 0.25 CASE ~I P RUNPRD PJSM for M/U welibore drifting BHA.
10:15 - 10:45 0.50 CASE i, P I RUNPRD M/U nozzle BHA #15 with a 3.50" nozzle, BHI Coiltrack DGS,
~ i I DPS, EDC, P&C, SWP & LQC. M/U injector.
10:45 - 13:30 2.75 i CASE j P ~ RUNPRD RIH with nozzle BHA#15. Meanwhile install & calibrate SLB
~ i UTIM tool. Wt check @ 10000' - Up = 30k & Run-in = 11 k. RIH
~ to 10730'
13:30 - 13:45 0.25 CASE I p ~ RUNPRD Log down GR at 150fph & tie-into formation marker. Correct
I CTD by -15' & BHI by 0'.
13:45 - 13:50 0.08 CASE P i RUNPRD RiH & tag top of 3-3/16" Inr @ 11075'. Stack 10k on TOL &
i observe no movement.
13:50 - 16:15 2.42 CASE j P I RUNPRD POOH with nozzle BHA#15 jetting hole @ 2.45bpm/3700psi.
16:15 - 16:30 0.25. CASE ! P RUNPRD PJSM for UD nozzle BHA#15.
16:30 - 16:45 0.25 CASE I, P RUNPRD UD nozzle BHA#15.
16:45 - 17:00 0.25 DRILL ', P ~ PROD1 PJSM for M/U GHST BHA #16.
17:00 - 18:00 1.00 DRILL I P ; ~ PROD1 M/U GHST BHA #16 with Hughes 2.74" STR324 PDC bit #12,
I ~ ' ~ 1.7deg X-treme motor, BHI HOT, DGS, DPS, EDC, P&C,
' I
, I
~
SWP & ~QC components. Scribe toots, M/U injector &
18:00 - 20:15 ~
2.25 '
DRILL I, P I
';
PROD1 Initialize/function test BHI tools.
RIH OHST BHA #16.
20:15 - 20:30 0.25 i DRILL ~ P
I PROD1 Log GR tie-in. -6' CTD.
20:30 - 20:45 0.25 i DRILL i P I~ PROD1 RIH and tag top of 2-3/8" liner on depth at 11,685'.
U wt=31K.
20:45 - 22:35 1.83 DRILL ~ P PROD1 Ream down from 11655' to top of Biliet at 60 fph with 140R TF
~~~" ~ ' ~ to cut trough above billet.
~ ~ I Ream down 3 times total. 1.6 bpm, 1.5 bpm returns, 2750
I psi, 140R TF, 60 FPH.
22:35 - 00:00 1.42 DRILL I P PROD1 Time drill sidetrack off of AL Billet with 1.7 deg motor, 1.6
bpm, 1.5 bpm returns, 2650 psi, 140R TF, 1 FPH, 200# wob,
1 light stall. Drilled to 11,687'.
7/7/2007 00:00 - 03:00 3.00 DRILL P PROD1 Drilled OHST off of AL Billet with 1.7 deg motor. 1.6 bpm, 1.5
bpm returns, 140R TF, 500# WOB, 1 fph to start, then
maintained 200-500# WOB. Fluid loss = 2 bph, Drilled to
11,704',
03:00 - 03:45 0.75 DRILL P PROD1 Ream down at 140R, Ream down at 90R, Ream down at
180R TF. OHST looks clean. No motor work or set down wt.
03:45 - 06:15 2.50 DRILL P PROD1 POH with OHST BHA. circ at full rate.
06:15 - 06:30 0.25 DRILL P PROD1 PJSM for UD S/T drilling BHA #16.
06:30 - 07:00 0.50 DRILL P PROD1 VD sidetrack drilling BHA #16.
07:00 - 07:15 0.25 BOPSU P PROD1 R/U for P/Testing BOPE.
07:15 - 07:30 0.25 BOPSU P PROD1 PJSM for P/Testing BOPE.
07:30 - 13:00 5.50 BOPSU P PROD1 Perform bi-weekly BOPE pressure/function test. Test
, witnessed by AOGCC Rep, Chuck Scheve.
13:00 - 13:30 0.50 BOPSU P PROD1
13:30 - 13:45 0.25 BOPSU P PROD1
13:45 - 14:00 0.25 DRILL P PROD1
14:00 - 15:00 1.00 DRILL P PROD1
Horn did not sound while testing gas alarms - found loose wire,
repair same & retested OK. H2S sensor @ shaker was bad -
replace same & retested OK.
R/D BOP PlTesting equipment.
P/Test inner reel valve.
PJSM for M/U lateral drilling BHA#17.
M/U lateral drilling BHA#17 with rerun Hycalog 2.7" x 3"
SRX3408 bicenter bit #13, 1.3deg X-treme motor, BHI HOT,
~ Pri~ted: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 14 of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/1981
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
- --
~
7/7/2007 14:00 - 15:00 1.00 DRILL P , i PROD1 USMPR, DGS, DPS, EDC, P&C, SWP, LQC & UQC. Scribe
~! tools. M/U injector & Initialize/function test BHI tools.
15:00 - 17:45 2.75 DRILL P ~ j PROD1 ; RIH with drilling BHA#17 to 11130'.
17:45 - 18:00 0.25 DRILL P I PROD1 ~ Log down GR at 150fph & tie-into RA Pip tag. Correct BHt by
' ' -5.5'.
18:00 - 18:10 0.17 DRILL P ~~ PROD1 ~ Continue RIH with drilling BHA#17 to 11525'.
18:10 - 18:30 0.33 DRILL P I PROD1 I MAD pass RES data from 11525' @ 600fph. Tag bottom at
1 11,704'. Clean OHST.
18:30 - 20:00 1.50 DRILL P I PROD1 I Drili Sag River lateral #2, 1.6 bpm, 1.5 bpm returns,
j ~ 2700-3200 psi, 120R TF, 87 deg incl, 90 fph, 9.5 ecd,
; Drilled to 11,821'.
20:00 - 20:20 0.33 DRILL P ~i PROD1 ~~ Wiper trip to window. Clean hole.
20:20 - 22:00 1.67 DRILL P ~I PROD1 I Drill Sag River lateral #2, 1.7 bpm, 1.6 bpm returns,
~ ~ 2900-3200 psi, 120R TF, 85 deg incl, 80 fph, 9.5 ecd,
i ~I Drilled to 11,944',
22:00 - 22:30 0.50 DRILL P ~ i PROD1 Wiper trip to window. Clean hole.
22:30 - 22:50 0.33 DRILL P ~ PROD1 ~i Drill Sag River lateral #2, 1 J bpm, 1.6 bpm returns,
'~ ! 2900-3200 psi, 120R TF, 85 deg incl, 80 fph, 9.5 ecd,
i ; ~ Drilled to 12,000'.
~i 22:50 - 23:10 0.33 DRILL P ! PROD1 i Wiper trip to window. Clean hole.
23:10 - 00:00 0.83 DRILL P ~ PROD1 i Drill Sag River lateral #2, 1.7 bpm, 1.6 bpm returns,
, 2900-3200 psi, 90L TF, 88 deg inci, 90 fph, 9.5 ecd, Drilled
I ; i, I to 12,066'.
7/8/2007 00:00 - 00:30 0.50 DRILL P ~ I PROD1 I Wiper trip. Clean hole.
00:30 - 01:00 0.50 DRILL P I PROD1 ~ Log GR tie-in at top of Sag River. +1 ft to CTD.
01:00 - 01:30 0.50 DRILL P I PROD1 ~ RIH ciean to TD.
01:30 - 03:00 1.50 DRILL P I PROD1 ' Drill Sag River Lateral #2, 1.7 / 1.6 bpm, 3100 - 3600 psi, 90L
~ ~ TF, 89 deg incl, 90 fph, 9.7 ECD
03:00 - 03:30 0.50 DRILL P i PROD1 I Wiper trip. Clean hole.
03:30 - 04:30 1.00 DRILL P ~ PROD1 ~ Drill Lateral #2, 1.7 / 1.6 bpm, 3100 - 3600 psi, 90R TF, 80
deg incl, 90 fph, 9.7 ECD.
Drilled to 12,253'. Directional Gamma Sub failed. Pull for BHl
DGS tool.
04:30 - 07:15 2.75 DRILL N DFAL PRODi I POOH lateral BHA#17.
07:15 - 07:30 0.25 DRILL N DFAL PROD1 i PJSM for UD lateral BHA#17.
07:30 - 08:00 0.50 DRILL N DFAL PROD1 I UD lateral BHA#17. Check bit - OK (1/11).
08:00 - 08:30 0.50 DRlLL N DFAL PROD1 R/U hydraulic cutter. Cut 100' of CT & eline for chrome pipe
management. Have 14276' of eline-CT left on reel.
08:30 - 10:00 1.50 DRILL N DFAL PROD1 Rehead & install SLB CTC. Pull test to 35k. Allow for 2.5' of
eline. M1U UQC & rehead eline. Conduct eline conductivity test
i - OK. Meg eline - OK. P/Test CTC & UQC to 3500psi.
10:00 - 10:45 0.75 DRILL N DFAL ' PROD1 M/U lateral drilling BHA#18 with rerun Hycalog 2.7" x 3"
SRX3408 bicenter bit #14, 1.1deg new X-treme motor, BHl
HOT, USMPR, new DGS, DPS, EDC, P&C, SWP, LQC &
UQC. Scribe tools. M/U injector & Initialize/function test BHI
tools.
10:45 - 13:00 2.25 DRILL N DFAL PROD1 RIH with driiling BHA#18 to 11130'.
13:00 - 13:15 0.25 DRILL N DFAL PROD1 log down GR at 150fph & tie-into RA Pip tag. Correct CTD by
+2' & BHI by +18'.
13:15 - 13:50 0.58 DRILL N DFAL PROD1 Continue RIH with drilling BHA#18 to 12253'.
13:50 - 15:00 1.17 DRILL P PROD1 Drill to 12356' with 170R TF, 1.74/1.63bpm, 3100/3650psi, 2.5k
DWOB, 9.79ppg ECD, 105fph ave ROP. Observe RES drop to
6ohms & Geos call TD.
Printed: 7/24/2007 5:07:14 PM
~ .
BP EXPLORATION Page 15 of 16
Operations Summary Report
Legal Well Name: E-11
Common Well Name: E-11 Spud Date: 8/20/198i
Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
7/8/2007 15:00 - 15:40 0.67 DRILL P PROD1 Wiper trip clean to top of 3-3/16" Lnr.
15:40 - 15:55 0.25 DRILL P PROD1 ~ Log down GR at 150fph & tie-into RA Pip tag. Correct BHI by
i -1'.
15:55 - 16:30 0.58 DRILL P PROD1 i RIH clean to btm tagged 2x @ 12353'.
16:30 - 19:45 ~ 3.25 DRIL~ P PROD1 , POOH with drilling BHA#18. Paint EOP flags @ 11300' &
I 10000'.
19:45 - 20:00 0.25 DRILL P PROD1 I SAFETY MEETiNG. Review procedures, hazards and
~ ~ mitigation for UO drilling BHA and RIH with 2-3/8" Liner.
20:00 - 20:30 0.50 DRILL P PROD1 ~ UO Drilling BHA. Recover 100%. Bit graded ( 1,1,1 ).
20:30 - 22:45 2.25 CASE P RUNPRD Run Indexing guide shoe, 30 jts, 2-3/8", 4.7#, L-80, Pre-Drilled
-
I STL Liner, XO and BTT depioyment sleeve. Liner total length
I = 936.89'.
~ i M/U BTT GS pump off spear and BHI Coiltrack tools. OAL =
j ~ I g76.95'.
22:45 - 00:00 1.25 i CASE P RUNPRD i RIH with 2-3/8" Pre-Drilled liner on pump off GS spear and BHI
I
I i Coiltrak toois. Circ at 0.2 bpm.
7/9/2007 00:00 - 01:00 ; 1.00 CASE P RUNPRD 'i
~ RIH to flag at 10,977'. Added 1.5' to CTD at flag.
I ~
01:00 - 01:20 '~ il
0.33 i
CASE
P
~ !
RUNPRD 'I RIH. Dwn wt = 14K, Up Wt at 11,400' = 35.5K.
RIH clean past OHST. RIH clean to TD. Tag TD on depth at
I I 12,353'. Up wt = 38.5 K,
i ~I ~ ; Up WOB =-2.6K, Dwn WOB = 1.4, Tag TD at 12,353' again.
I ! ~ Liner is landed at TD.
j ~ I , Set down 8K on liner.
01:20 - 01:30 0.17 CASE P RUNPRD I Circ at 1.9 bpm, 4400 psi, 1.6 bpm returns.
i j Pick up free from liner at 34K up wt, WOB = 200#.
; l
Left top of Pre-Drilied liner at 11,416'.
01:30 - 04:00 2.50 CASE P ~ RUNPRD j POH with GS pump off spear and Coiltrak tools. I
04:00 - 04:30 0.50 CASE P RUNPRD i Lay out BHA. M/U blind sub and jet nozzle.
04:30 - 07:10 2.67 ~ WHSUR P POST i RIH with nozzle BHA to 11300' to circ 4-1/2" tubing & liner to
diesei.
07:10 - 10:00 2.83 WHSUR P POST POOH from 11300' displacing wellbore to diesel & maintaining
+/-200psi WHP. Strip nozzle OOH & bleed off trapped WHP.
10:00 - 10:45 0.75 WHSUR N WAIT POST W.O. N2 unit to arrive onsite. Meanwhile open up well against
the choke & observe WHP build-up & stabilize @ 100psi.
10:45 - 11:15 0.50 WHSUR P POST R/U N2 Unit. Mix-up 15bbis A261 inhibitor in pill pit.
11:15 - 11:30 0.25 WHSUR P POST PJSM for pickling & B/D CT.
11:30 - 13:30 2.00 WHSUR P POST Pump 15bbis bleach, 40bbls fresh water, 15bbis A261 inhibitor
& 6bbls MeOH to pickle CT.
13:30 - 15:15 1.75 WHSUR N WAIT POST Observe faulty primer pump in N2 unit. SLB Technicians
troubleshoot N2 primer pump - seems like they cooled down
too early & froze the primer pump. Call for BPV. Meanwhile
cleanout pits & outside tanks.
15:15 - 15:30 0.25 WHSUR P POST PJSM for instailing BPV.
15:30 - 16:30 1.00 W HSUR P POST Pull DSM lubricator to floor. R/U lubricator onto well & install
BPV in TFiS. R/D lubricator. SI master & swab valves (23-1/2
turns each).
16:30 - 17:45 1.25 WHSUR P POST Blow down CT with N2 & bleed down.
17:45 - 18:30 0.75 WHSUR P POST P/U injector. Break-off nozzle & blind sub.
18:30 - 18:45 0.25 WHSUR P POST SAFETY MEETING. Review procedure, hazards and
mitigation for pulling coil to reel and securing coil for reel swap.
18:45 - 21:45 3.00 WHSUR P POST Install internal grapple, pull coil to reel, secure coil. Secure
bridge crane to reel. Pul~ pins.
21:45 - 22:00 0.25 WHSUR P POST SAFETY MEETING. Review procedure, hazards and
Printed: 7/24/2007 5:07:14 PM
~ ~
BP EXPLORATION Page 16 of 16
Operations Surnmary Report
Legal We~l Name: E-11
,Common Well Name: E-11 Spud Date: 8/20/1981
' Event Name: REENTER+COMPLETE Start: 5/20/2007 End: 7/10/2007
Contractor Name: NORDIC CALISTA Rig Release: 7/10/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase : Description of Operations
--- -- ---- __
~
7/9/2007 21:45 - 22:00 ~; 0.25 WHSUR P POST mitigation for lowering 2" reel and picking up 2-3/8" reel with
bridge crane.
22:00 - 00:00 i 2.OOI WHSUR P POST Lower reel onto trailer and secure. No problems.
i I ~ Pick up 2-3/8" reei off of second trailer. Close door. Secure
~i ~', reel in pins and release from bridge crane. Bridge Crane
II j I working well. Instail internai grapple.
7/10/2007 00:00 - 03:30 ~I 3.50 ~ BOPSU P POST Change out pipe rams for 2-3/8" coiled tubing.
i ~ N/D BOPE. Press test tree cap.
I RELEASED RIG AT 0330 HRS, 07/10/07.
! TOTAL OF 16 DAYS, 23 HOURS FROM RIG ACCEPT TO
II RELEASE.
I ~
I I ~ All further information will be in DIMS under well E-19B.
Printed: 7/24/2007 5:07:14 PM
~ ~ . ~
BP Alaska
Baker Hughes INTEQ Survey Report
~~~~
BAKER
i~1GiES
~.. _._.,~
- _ _ _ -- -- -
_ -- --- _ _- ___
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Dalum: NAD27 (Clarke 1866) Coord'wate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
- ------ - - - -- -- --___ _ _ _ _ _--- - -_
--
Site: PB E Pad
TR-11-14
UNITED STATES : North Slope
Site Position: Northing: 5973160.88 ft Latitude: 70 19 59.134 N
From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.24 deg
- ---
Well: E-11 --- - _ ___- _
S1ot Name: - _ _-- --
11
E-11
Well PosiNon: +N/-S 3398.09 ft Northing: 5976601.00 ft Latitude: 70 20 32.551 N
+E/-W 1987.27 ft Easting : 664452.00 ft Longitude: 148 39 54.999 W
; Position Uncertainty: 0.00 ft
. _ _ - _ _ _-__ _
Wellpath: E-11 BL1 __ - -___ _ _-_ _ __ -- ---
Drilled From: -- -
E-11 BL1 PB1
Tie-on Depth: 11456.73 ft
Current Datum: E-11 B: Height 57.83 ft Above System Datu m: Mean Sea Level
Magnetic Data: 7/5/2007 Declination: 23.73 deg
~eld Strength: 57655 nT Mag Dip Angle: 80.94 deg
! Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
; ft ft ft deg
_ _ -
- --
25.80
-
- _ _
0.00
_- -
0 00
_ ___ -
33.33
_ --- -- -- _
Survey Program for Definitive Wellpath _ -- - __ _ _
Date: 7/5/2007 Validated: No Version: 2
Actual From To Survey Toolcode Tool Name
ft ft
-_ -
97.05 ------
4797.05 -- - _ _ - ---
Sperry Boss Gyro MuRishot (97 _ _ _ -
BOSS-GYRO
4860.00 11101.36 E-116 IIFR+MS+SAG (4860.00-116 MWD+IFR+MS
11111.00 11456.73 MWD (11111.00-12819.00) (6) MWD
11525.23 13547.00 MWD (11525.23-13547.00) MWD
Annotation
11456.73 9084.54 TIP
13547.00 9062.27 TD
Survey: MWD
Company: Baker Hughes INTEQ
Tool: MWD;MWD - Standard
Start Date:
Engineer:
Tied-to:
Sperry-Sun BOSS gyro mu~ishot
MWD + IFR + Mufti Station
MWD - Standard
MWD - Standard
7/5/2007
From: Definitive Path
~p~ - c~b I
~
° ~ ~
BP Alaska
Baker Hughes INTEQ Survey Report
~~~~
BAKER
wu~~s
~~. _~.,,~
5urvey
11456.73 110.54 240.85 9084.54 9026.71 4831.44 1965.47 5981474.05 666310.88 5116.66 0.00 MWD
11525.23 110.49 235.89 9060.52 9002.69 4797.80 1910.86 5981439.23 666257.03 5058.55 6.78 MWD
11555.43 98.81 236.13 9052.89 8995.06 4781.50 1886.68 5981422.40 666233.21 5031.64 38.68 MWD
17584.67 91.77 229.17 9050.35 8992.52 4763.84 1863.56 5981404.25 666210.48 5004.78 35.27 MWD
11613.43 86.87 219.89 9050.84 8993.01 4743.37 1843.42 5981383.34 666190.80 4976.01 35.55 MWD
11642.79 89.94 210.39 9051.66 8993.83 4719.40 1826.55 5981359.01 666774.46 4946.72 33.99 MWD
11671.55 90.27 199.68 9051.62 8993.79 4693.38 1814.40 5981332.73 666162.88 4918.30 37.25 MWD
11703.90 89.88 187.09 9051.60 8993.77 4661.97 1806.92 5981301.17 666156.10 4887.95 38.93 MWD
11735.78 90.37 175.17 9051.53 8993.70 4630.16 1806.30 5981269.35 666156.17 4861.02 37.42 MWD
11766.23 90.49 163.74 9051.30 8993.47 4600.27 1811.86 5987239.59 666162.39 4839.11 37.54 MWD
11795.63 90.58 153.11 9051.02 8993.19 4572.97 1822.65 5981212.54 666173.78 4822.24 36.16 MWD
11826.27 90.67 142.50 9050.69 8992.86 4547.08 1838.95 5981187.01 666190.64 4809.56 34.63 MWD
11859.07 91.01 131.26 9050.21 8992,38 4523.18 1861.34 5981163.61 666213.54 4801.89 34.28 MWD
11888.81 91.41 120.35 9049.58 8991.75 4505.81 1885.41 5981146.77 666237.99 4800.67 36.70 MWD
11922.63 90.40 112.69 9049.04 8991.21 4490.73 1915.65 5981132.36 666268.55 4804.62 22.84 MWD
11955.38 89.45 109.13 9049.08 8991.25 4479.04 1946.24 5981121.34 666299.38 4811.66 11.25 MWD
11985.78 88.50 106.03 9049.63 8991.80 4469.86 1975.21 5981112.80 666328.55 4819.91 10.66 MWD
12015.92 88.68 102.68 9050.37 8992.54 4462.39 2004.39 5981105.98 666357.89 4829.71 11.13 MWD
12044.80 89.39 99.71 9050.86 8993.03 4456.79 2032.72 5981100.99 666386.32 4840.59 10.57 MWD
12075.37 89.72 96.20 9051.09 8993.26 4452.56 2062.99 5981097.43 666416.68 4853.69 11.53 MWD
12105.49 89.97 92,32 9051.18 8993.35 4450.32 2093.02 5981095.85 666446.75 4868.32 12.91 MWD
12135.79 89.69 88,82 9051.27 8993.44 4450.02 2123.31 5981096.21 666477.04 4884.72 11.59 MWD
12165.37 89.66 84,73 9051.43 8993.60 4451.68 2152.84 5981098.52 666506.52 4902.33 13.83 MWD
12196.06 89.36 82.07 9051.70 8993.87 4455.21 2783.32 5981102.72 666536.92 4922.03 8.72 MWD
12226.82 86.59 79.67 9052.78 8994.95 4460.08 2213.67 5981108.26 666567.15 4942.78 11.91 MWD
12263.31 87.71 75.52 9054.79 8996.96 4467,91 2249.24 5981116.86 666602.54 4968.87 11.44 MWD
12293.23 89.42 72.96 9055.70 8997.87 4476.03 2278.02 5981125.61 666631.13 4991.47 11.52 MWD
]2325.96 89.17 69.60 9056.10 8998.27 4486.53 2309.01 5981136.79 666661.88 5017.27 10.29 MWD
12356.48 89.85 66.86 9056.36 8998.53 4497.85 2337.35 5987148.73 666689.96 5042.30 925 MWD
12386.64 89.57 63.91 9056.51 8998.68 4510.41 2364.77 5981161.89 666717.10 5067.86 9.82 MWD
12416.04 89.57 67.10 9056.73 8998.90 4523.98 2390.84 5981176.03 666742.87 5093.53 9.56 MWD
12446.64 89.32 57.62 9057.03 8999.20 4539.58 2417.17 5981192.19 666768.84 5121.02 11.40 MWD
12465.15 90.64 55.88 9057.04 8999.21 4549.72 2432.64 5981202.68 6667&4.09 5138.00 71.80 MWD
12494.49 91.63 53.37 9056.45 8998.62 4566.72 2456.55 5981220.19 666807.62 5165.34 9.39 MWD
12524.00 91.20 49.63 9055.73 8997.9Q 4585.09 2479.63 5981239.06 666830.28 5193.37 12.55 MWD
12555.62 91.69 52.43 9054.93 8997.10 4604.97 2504.20 5981259.47 666854.41 5223.48 8.99 MWD
12584.64 90.06 55.69 9054.48 8996.65 4622.00 2527.69 5981277.01 666877.52 5250.61 12.56 MWD
12614.58 90.09 59.68 9054.45 8996.62 4638.00 2552.99 5981293.56 666902.46 5277.88 13.33 MWD
12646.13 90.49 64.04 9054.29 8996.46 4652.87 2580.80 5981309.04 666929.94 5305.60 13.88 MWD
12678.24 91.17 68.01 9053.82 8995.99 4665.92 2610.13 5981322.73 666958.97 5332.61 12.54 MWD
12711.22 89.72 73.23 9053.56 8995.73 4676.86 2641.23 5981334.34 666989.82 5358.84 16.43 MWD
1274d.91 88.92 70.77 9053.96 8996.13 4687.27 2673.27 5981345.45 667021.62 5385.14 7.68 MWD
12782.10 90.71 67.02 9054.08 8996.25 4700.66 2707.95 5981359.60 667056.00 5415.39 11.17 MWD
12814.54 89.14 62.42 9054.13 8996.30 4714.50 2737.28 5981374.09 667085.01 5443.07 14.98 MWD
12844.28 90.03 59.19 9054.34 8996.51 4729.01 2763.23 5981389.16 667110.65 5469.45 1127 MWD
12889.19 90.71 54.95 9054.05 8996.22 4753.42 2800.92 5981414.38 667147.78 5510.55 9.56 MWD
12919.63 89.69 51.57 9053.95 8996.12 4771.62 2825.31 5981433.12 667171.77 5539.17 11.60 MWD
12949.59 89.75 47.79 9054.09 8996.26 4791.00 2848.15 5981452.99 667194.17 5567.91 12.62 MWD
12979.83 89.42 44.06 9054.31 8996.48 4812.03 2869.87 5981474.49 667215.42 5597.42 12.38 MWD
13010.84 89.51 40.40 9054.60 8996.77 4834.99 2890.71 5981497.90 667235.75 5628.05 11.87 MWD
13048.47 89.69 44.33 9054.86 8997.03 4862.79 2916.06 5981526.25 667260.49 5665.20 10.45 MWD
13076.97 90.15 48.39 9054.90 8997.07 4882.45 2936.68 5981546.36 667280.67 5692.96 14.34 MWD
13108.87 89.20 52.82 9055.08 8997.25 4902.69 2961.32 5981567.13 667304.86 5723.42 14.20 MWD
~
•
BP Alaska
Baker Hughes INTEQ 5urvey Report
~~~
BAK~E;R~$
1NTEQ
Survey
13136.51 89.57 56.35 9055.38 8997.55 4918.71 2983.84 5981583.63 667327.03 5749.17 12.84 MWD
13166.75 90.31 59.75 9055.41 8997.58 4934.71 3009.50 5981600.19 667352.32 5776.64 11.51 MWD
13193.59 90.43 62.67 9055.24 8997.41 4947.63 3033.02 5981613.63 667375.55 5800.36 10.89 MWD
13223.57 90.55 66.21 9054.98 8997.15 4960.56 3060.06 5981627.15 667402.30 5826.02 11.81 MWD
13251.08 90.09 69.91 9054.83 8997.00 4970.84 3085.57 5981637.98 667427.58 5848.63 13.55 MWD
13284.83 88.62 72.20 9055.21 8997.38 4981.80 3117.49 5987649.64 667459.24 5875.32 8.06 MWD
13314.99 88.07 68.98 9056.08 8998.25 4991.81 3145.92 5981660.27 667487.45 5899.31 10.83 MWD
13344.33 86.93 65.48 9057.36 8999.53 5003.16 3172.94 5981672.20 667514.21 5923.64 12.53 MWD
13374.46 87.60 62.67 9058.80 9000.97 5016.31 3200.01 5981685.95 667540.98 5949.50 9.58 MWD
13404.94 88.53 59.36 9059.83 9002.00 5031.07 3226.65 5981701.29 667567.29 5976.47 11.27 MWD
13436.00 88.99 56.54 9060.50 9002.67 5047.55 3252.97 5981718.34 66759324 6004.70 9.20 MWD
13465.50 89.08 60.19 9061.00 9003.17 5063.02 3278.07 5981734.35 667618.00 6031.42 12.37 MWD
13496.58 88.50 64.86 9061.65 9003.82 5077.35 3305.64 5981749.29 667645.24 6058.54 15.14 MWD
13524.14 89.60 68.25 9062.11 9004.28 5088.31 3330.91 5981760.80 667670.27 6081.59 12.93 MWD
13547.00 89.60 6825 9062.27 9004.44 5096.78 3352.14 5981769.73 667691.31 6100.33 0.00 MWD
~
' ~' ~ •
BP Alaska
Baker Hughes INTEQ Survey Report
~~~~
B~':~~~Q
~~.~~Y
Survey Program for Definitive Wellpath
Date: 4/16/2007 Validated: No Version: 1
Actual From To Survey Toolcode
ft ft
i
97.05 4797.05
I
Sperry Boss Gyro Muftishot (97 _ ---
BOSS-GYRO
4860.00 11101.36 E-11 B IIFR+MS+SAG (4860.00-116 MWD+IFR+MS
11111.00 12819.00 MWD (11111.00-12819.00) MWD
Aq~Ot8t10II
Wellpath: E-11 BL1 PB1 Drilled From: E-11 B
Tie-on Depth: 11101.36 ft
Current Datum: E-11 B: Height 57.83 ft Above System Datum: Mean Sea Level
Magnetic Data: 3/72/2007 Declination: 24.04 deg
Field Strength: 57661 nT Mag Dip Angle: 80.96 deg
I Vertical SecNon: Depth From (TVD) +N/-S +E/-W Direction
_ ft ft
----- - ft
- _ _ _ deg
_
_---
~ 25.80 0 00 0.00 31.89
Site PosiHon: Northing: 5973160.88 ft Latitude: 70 19 59.134 N
I From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W
Position Uncertainty: 0.00 ft North Reference: True
Groand Level: 0.00 ft Grid Convergence: 1.24 deg
__ _ __ _ ---
Well: E-11 - -- - - - _ ---- -- __ _
Slot Name: -- -
11 -. _ _ _-
E-11
Well Position: +N/-S 3398.09 ft Northing: 5976601.00 ft Latitude: 70 20 32.551 N
+E/-W 1987.27 ft Easting : 664452.00 ft Longitude: 148 39 54.999 W
I Position Uncertainty: 0.00 ft
~eld: Prudhce Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
L Sys Datum Mean Sea Level Geomagnetic Model: bggm2007
- -- -- -__ _ _ _ _ . --- --- __ __ _- ----
-___ _ _
Site: PB E Pad
TR-71-14
UNITED STATES : North Slope
11101.36 9022.56 TIP
11111.00 9031.30 KOP
12819.00 9058.09 TD
~ Survey: MWD
~ Company: Baker Hughes INTEQ
i Tool: MWD,MWD - Standard
I
__I
Tool Name
_ _--- -- - ._ --- ---- _ _ -
Sperry-Sun BOSS gyro muRishot
MWD + IFR + Mufti Station
MWD - Standard
- - - _ __ -_- -- - _ __-
Start Date: 6/29/2007
Engineer:
Tied-to: From: Definitive Path I
~l~"7 '~ ~ ~
^ ~~ • •
BP Alaska
Baker Hughes INTEQ Survey Report
~~~~
BAKER___
i~vTEQ
Survey
12764.04 93.50 38.86 9061.44 9003.61 4735.85 2938.79 5981399.85 667285.99 5573.57 15.79 MWD I
12819.00 93.50 38.86 9058.09 9000.26 4778.57 2973.21 5981443.30 667319.47 5628.02 0.00 MWD
,~ i •
BP Alaska
- Baker Hughes INTEQ 5urvey Report
BAKER
Y~~tY~C
_ -- -- - ---
--_ ___
Field: Prudhoe Bay
_ __ -
- -- --- _
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate 5ystem: Well Centre
Sys Datum: Mean Sea Level GeomagneNc Model: bggm2007
I _ - -
-_ _
Site: PB E Pad
_-- - _ .
- _
_
~ TR-11-14
~ UNITED STATES : North Slope
Site Position: Northing: 5973160.88 ft Latitude: 70 19 59.134 N
From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft
-- -- -- --_ _ . __ -
_ . _ --- -- Grid Convergence:
_ _ --- -
_ -- - 1.24 deg
- - . __ _ _
___ __ _ __
Well: E-11 Slot Name. 11
E-11
; Well Position: +N/-S 3398.09 ft Northing: 5976601.00 ft Latitude: 70 2Q 32.551 N
+E/-W 198727 ft Easting : 664452.00 ft Longitude: 148 39 54.999 W
Position Uncertainty: 0.00 ft
_ . ---
Wellpath: E-11 BL1 P62 ------- - _ ---- __
Drilled From: __ --- __
E-11 BL1 P61
Tie-on Depth: 12149.73 ft
Current Datum: E-11 B: Height 57.83 ft Above System Datum: Mean Sea Level
MagneHc Data: 7/2/2007 Declination: 23.91 deg
i Field Strength: 57665 nT Mag Dip Angle: 80.97 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
_
- - --- - - -_ ___
25.80 __ _ _- -
0.00 - _ _- -
0.00
-- _--- --_
30,02
-
I _ -- - - --
~ - - -- - - -
Survey Program for Definitive Wellpath - - - ---
-- _-- - ---
_ _ - -
-
i Date: 7/2/2007 Validated: No Version: 0
I
i~
I
~
- . _J
~ Actual From To Survey Toolcode Tool Name
ft ft
-- -- -
97.05
4797.05 _ __ . ___- ---- _
Sperry Boss Gyro Multishot (97 - _ . __ _-----_
BOSS-GYRO _ _ _- - _ _ _
Sperrysun BOSS gyro multishot
4860.00 11101.36 E-11 B IIFR+MS+SAG (4860.00-116 MWD+IFR+MS MWD + IFR + Mufti Station
11111.00 12149.73 MWD (11111.00-12819.00) (6) MWD MWD - Standard
12170.00 12636,00 MWD (12170.00-12636.00) MWD MWD - Standard
Annotation
12149.73 9043.23 TIP
12170.00 9043.73 KOP
12636.00 9035.94 TD
, _ - --- ___ - __ __ __ __ _- -
; Survey: MWD Start Date: 7/2/2007
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD - Standard Tied-to: From: Definitive Path
~, l1 `~ ~ ~ ~ ~
~ ~.
i
~~
BP Alaska
Baker Hughes INTEQ Survey Report
~~~~
BAKER
u ~s_u~~+
INTEQ
Survey
12149.73 89.39 82.29 904323 8985.40 4569.80 2376.92 5981221.53 666727.94 5145.95 0.00 MWD
12170.00 87J7 84.49 9043.73 8985.90 4572.14 2397.05 5981224.30 666748.01 5158.04 13.48 MWD
12207.36 92.22 80.26 9043.73 8985.90 4577.09 2434.06 5987230.Q6 666784.90 5180.84 16,43 MWD
12237.94 92.06 76.60 9042.59 8984.76 4583.22 2463.99 5981236.85 666814.69 5201.13 11.97 MWD
12267.02 90.74 72.56 9041.88 8984.05 4590.95 2492.01 5981245.19 666842.53 5221.83 14.61 MWD
12298.42 90.55 67.18 9041.53 8983.70 4601.75 2521.48 5981256.63 666871.76 5245.93 17.14 MWD
12328.25 91.41 62.91 9041.02 8983.19 4614.33 2548.51 5981269.80 666898.51 5270.35 14,60 MWD
12358.07 92.15 58.93 9040.09 8982.26 4628.81 2574.56 5981284.85 666924.22 5295.92 13,57 MWD
12397.34 91.91 53.45 9038.70 8980.87 4650.64 2607.15 5981307.39 666956.33 5331.13 13,96 MWD
12428.59 90.40 49.70 9038.07 8980,24 4670.06 2631.62 5981327.33 666980.37 5360.18 12,93 MWD
12457.73 91.14 45.08 9037.68 8979,85 4689.78 2653.06 5981347.52 667001.37 5387.98 16,06 MWD
12488.43 92,73 40.12 9036.64 8978,81 4712.35 2673.82 5981370.54 667021.63 5417.92 16,96 MWD
12519.31 92,21 42.41 9035.31 8977,48 4735.54 2694.17 5981394.17 667041.46 5448.17 7.60 MWD
12550.42 90,74 46.07 9034.51 8976.68 4757.82 2715.86 5981416.92 667062.66 5478.31 12.67 MWD
12582.48 88,65 50.50 9034.68 8976.85 4779.14 2739.79 5981438.76 667086.11 5508.75 15.28 MWD
12636.00 88,65 50.50 9035.94 8978.11 4813.18 2781.07 5981473.69 667126.63 5558.87 0.00 MWD
TREE= 4-1/16" CNV
WEILHEAD= FP:IC
ACTUATOR = OTIS
KB. ELEV = 68.77'
BF.ELEV = 30.~8
KOP = 2008'
Max Angle =110.54° @ 1 1457'
Datum MD = 11687'
Datum ND = 9486 SS
~11 B L 1& B L 1~0 ~ SAFEfY NOTES: NOTE: PARENT WELLBORE NOT
CTD Sidetrack SHOWN. ***a-~~2~~ CHROMETBG~
DRLG DRAFT
2235~ (~4-1/2" HES X NIP, ID = 3.813"
GA S LIFT MANDRELS
13-3/8" CSG, 68#, L-80, ID = 12.415" ~-~ 2729'
Minimum ID =1.92" @ 11417'
2-3/8" STL PRE-DRILLED LNR
ST MD ND DEV TYPE VLV LATCH PORT DATE
3 4134 3800 37 KBG2 DMY BK 0 07/17/07
2 7560 6218 50 KBG2 DMY BK 0 07/17/07
1 9939 8006 29 KBG2 DMY BK 0 11/28/06
470~~ 9-5/8" X 7" BKR G2 ZXP LTP I
w/ 11.6' TIFBACK SLV, ID = 6.28"
472~' 9-5/8" X 7" BKR FLIX-LOK LNR HGR, ID = 6.32"
IWHIPSTOCK(10/15/06) ~ 4861'
¢sv (~oi~aios) 4878'
9-5/8" CSG, 47#. L-80. ID = 8.681" I 10167~
FROM PARENT WELLBOREI
A
4-112" TBG, 12.6#, 13CR-80, I-j 10963,
VAM TOP, .0152 bpf, ID = 3.958"
~ TOP OF 3-3116" LINER ~~ 11082~ r
7" LNR, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" 11095~
MECHANICAL WHIPSTOCK~ 11111'
WINDOW 11111' - 11119'
11120'
PRE-DRILLEDLINER SUMMARY
REF LOG: MWD/GR/ROP/EWR ON 06/23%07 07/08/07
ANGLE AT TOP PRE-DRILLED LNR: 87.6' @ 11695'
Note: Refer to Production GB for historical perf data
SIZE HPF INTERVAL Opn/Sqz DATE
3/8" 4- 8 11695' - 13514' Opn 07/05i07
3/8" 4- 8 1 1418' - 12352' Opn 07/08/07
4-1/2" LNR, 12.6#, L-80, BTC-M, .0152 bpf, ID = 3.958" 11687~
MILLOUT WINDOW (E-11B) 4861' - 4878'
10843~ ~ 4-1 /2" HES X NIP, ID = 3.813" ~
10906' 7"X 4-1/2" BKR S-3 PKR, ID = 3.870"
10929~ 4-1/2" HES X NIP, ID = 3.813"
10947~ 7" X 5" BKR G2 ZXP LTP
w/ TIEBACK SLV, ID = 4.410"
10950~ 4-1/2" HES X NIP, ID = 3.813"
10963' 4-1(2" WLEG, ID = 3.875"
10964~ 7" X 5" BKR HMC LNR HGR, ID = 4.420"
, 10971 ~ - 5" X 4-1 /2" XO, ID = 4.540"
3-3/16" DRILLING LNR SHOE 11520'
11686~ ALUMINUM WHIPSTOCK
\ L - - - - =
TOPOF2-3/8"LNR1 11416' ~ BL1
B
I 2-3/8". 4.7#lft. STL, L-80, PRE-DRILLED LNR ~ 13547~
12353' 2-3/8", 4.7#/ft, STL, L-80, PRE-DRILLm LNR
DATE REV BY COMMENTS DATE REV BY COMMENTS
? ORIGINAL COMPLEfION 02/09l07 PJC DRLG DRAFT CORRECTIONS
10/24/97 JLM SIDETRACK (E-11A) 04l27l07 MSE CTD PROPOSED LATERALS
11/06/O6 N2ES SIDETRACK (E-116) 07109l07 JUE NORDIC-1 CTD SIDEfRACK
11/28/O6 DAV/TL TREE CORRECTION & GLV G 07/17/07 KSB/PJC GLV GO
12/07/06 RRD/TLH INITIAL PERFORATIONS
PRUDNOE BAY UNfT
WE1.L: E-11BL1 & BL1-01
PERMIT No:
API No: 50-029-20475-02
Sec. 6, T11N, R14E, 500' WEL & 463' SNL
BP 6cploration (Alaska)
~ 333 W. 7th AVENUE, SUfTE 100
~~~~i+YA~~~-~~~ ~~1~1~~s-7I~1` ANCHORAGE,ALASKA 99501-3539
~a1 ~~$1~ PHONE (907) 279-1433
FAX {907) 276-7542
Mary Endacott
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-11 BL 1
BP Exploration (Alaska) Inc.
Permit No: 207-061
Surface Location: 463' FNL, S00' FEL, SEC. 06, Tl 11N, R14E, UM
Bottomhole Location: 4644' FSL, 2911' FWL, SEC. 32, T12N, R14E, UM
Dear Ms. Endacott:
Enclosed is the approved application for permit to redrill the above referenced
development well.
The permit is for a new wellbore segment of existing well E-11 B, Permit No.
206-143, API No. 50-029-20475-02. Production should continue to be
reported as a function of the original API number stated above.
In your application you identify a contingency that must be addressed in
advance. If lost circulation or unstable hole is encountered, it may be
necessary to partially cement the liner of this wellbore. Should this happen,
cementing the upper portion of the liner will abandon the existing perforations
in the main E-11 B wellbore. Abandoning these perforations will result in an
important change: the planned E-11 BL 1 multilateral will instead become a
redrill named E-11 C. To ensure clear record keeping and statistical reporting,
a new permit to drill and a new API number wili be required for E-11 C, and
this permit for E-11 BL 1 will be cancelled.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
'vvi~ii~iaLi% ~jic j~ciiiii~ 3i1 ~~t3~ ZvCfll`, li W~S e2'Z'0I1e0USly 2SSUeC1.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the ~laska Administrative Code,
~
~
~
~ PBU E-I 1BL1
Permit No. 207-061
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field inspector at (907) 6~t9~-3607 (pager).
Sincerely,
0
DATED this ~ day of May, 2007
cc: Department of Fish 8a Game, Habitat Section w/o encl.
Department of Environmental Conservation w/ o encl.
STATE OF ALASKA S'~~~
ALAS~IL AND GAS CONSERVATION COMMI~N
PERMIT TO DRILL ~I~~
20 AAC 25 005
1 a. Type of work
^ Drill ~ Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas
^ Service ^ Muitiple Zone
^ Stratigraphic Test ~ Development Oil ^ Single Zone 1 c. Specify if well is prop ~~~e
^ Coalbed Methane ~~Sa '1i~~ates
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
PBU E-11BL1
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 13350 ND 9006ss 12. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section):
Surface:
463' FNL
500' FEL
T11 N
R14E
SEC
06
UM 7. Property Designation:
ADL 028299 Pool
,
,
.
,
,
,
Top of Productive Horizon:
4226' FSL, 1711' FWL, SEC. 32, T12N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date:
June 1, 2007
Total Depth:
4644' FSL, 2911' FWL, SEC. 32, T12N, R14E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
5,050'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-664452 y-5976601 Zone-ASP4 10. KB Elevation
(Height above GL): 57.83 feet 15. Distance to Nearest Well Within Pool:
959'
16. Deviated Wells: Kickoff Depth: 11112 feet
Maximum Hole An le: 109 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3276 SurFace: 2340
f8: Gasin Pr ram: S cifications To - Settin De th - 6o ttom uant' of Cement c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD ND includin sta e data
4-1/8" 3-31/6" x z-~~e~~ 62# / 6.16# L-80 rCtl ~ STL 2350' 11000' 8874' 13350' 9006' Uncemented Slotted Liner
19. PRESE NT WELI CONDITION SUMMARY (To be completed for RedrilYand Re-entry Operations)
Total Depth MD (ft):
11687 Total Depth TVD (ft): Plugs (measured):
9544 None Effective Depth MD (ft):
11600 Effective Depth ND (ft):
9466 Junk (measured):
None
Casing Length Size Cement Volume MD ND
Conductor / Structural 110' 20" x 30" 8 cu ds Concrete 110' 110'
Surface 2729 13-3/8" 3720 cu ft Arcticset 11 2729' 2676'
Intermediate g7g2~ 9-5/8" 1450 cu ft Class'G' 130 cu ft Arcticset I 4861' 4382'
Pr ducti n
Liner 6392' 7" 1016 cu ft LiteCrete 197 cu ft Class 'G' 4703' - 11095' 4255' - 901 T
Liner 740' 4-1/2" 129 cu ft Class'G' 10947' - 11687' 8884' - 9544'
Perforation Depth MD (ft): 11103' - 11153'
~ ~~ PerForation Depth ND (ft): 9025' - 9070'
20. Attachments , ~ iling Fee, $100 ~ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Mary Endacott, 564-4388
Printed Name Mary Endacott Title CT Drilling Engineer
Prepared By Name/Number:
Si nature Phone 564-4388 Date ~ ~ Terrie Hubble, 564-4628
Commission Use Onl
Permit To Drill
Numberra~0 O U API Number:
50-029-20475-60-00 Permit Approval See cover letter for
Date: i O other re uirements
Conditions of Approval: ~
If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales:
Samples Req'd: Yes o Mud Log Req'd: ^ Yes ~ No
HZS Measures: ~ Y~s ^ o Dire ional Survey Req'd: (~ Yes ^ No
Other: '~,~'~C~~y`~ ~ ~ "~.'~~
~//~ ~+1~ APPROVED BY THE COMMISSION
Date ~~ , COMMISSIONER
;~~~~~ V ~~
~a~R 3 0 Z007
~ ~n •~n
Form 10-401 Revised 12/2005 O~ i~~~~~ V `[ / ~„ Submit In DupliCate
f v
~ ~
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: M. S. Endacott
BPAlaska CTD Engineer
Date: Apri126, 2007
Re: E-11B L1 and L1-O1
CC: Well File
Sondra Stewman/Terrie Hubble
bp
E-11 was originally drilled in 1994 and completed in Zone 2 of the E-K Graben. After the well
had reached marginal GOR the well was recompleted into the Sag with 70 feet of open hole. In
1997 the well was sidetracked to a Sag target that was northeast of the original well. This was
done because the well had high GOR and was on less than 10 percent of the time.
E-11 A was drilled in October 1997 and was on fulltime for the next 2 years producing. The
well was shut-in January 2000 for high GOR. The well was brought back on in October 2000
and showed signs of the oil rate healing, but the gas rate had not decreased and resulted in the
well being above marginal. When the well was screened for a CST it was discovered that the
well had collapsed tubing. E-11 A was then secured while it awaited the E-pad Production
Optimization Project and a RST.
The well was twinned with E-38, a producer into the high pressure (HP) header. In December
2004, the E-pad Production optimization project was completed and now both wells have
access to a new high pressure trunk line. Operations now have the option to produce through
this high pressure line or through the original6" line.
REASON FOR LATERALS:
In November 2006, a pilot hole (E-11B) was drilled to evaluate the Ivishak and SAG Pavlov
prospect. The logs indicated that the Ivishak is wet and the SAG is hydrocarbon bearing
verifying our expected case. Post RST eline perforated 50' of vertical SAG. Due to the limited
length of perforations in a vertical hole operations was unable to kick off and test the well. A
Static pressure survey was run on 3/12/07 that verified the Pavlov block is in pressure
communication with the rest of Prudhoe. It is recommended that we proceed with a mulitlat
horizontal CST into the SAG to effectively drain the Pavlov fault block.
The laterals are planned on or around June 2007. The laterals, E-11BL1 and BL1-O1, will exit the
existing 4 1/2" liner and kick off in Sag River zone and target Sag. The existing perforations will
be left open to flow and both laterals will be completed with slotted liner. However there is a
contingency cemented liner in the event of lost circulation or wellbore stability issues; in this
instance, the lateral names will be changed to E-11C and E-11CL1. The following describes
work planned. A schematic diagram of the proposed sidetrack is attached for reference.
Pre-Rig Work:
1. MIT IA, OA;Passed rig MIT-IA 3500psi 11/1/06; Passed MIT-OA 2000psi 10/7/06
2. Set 4%z" monobore whipstock at 11,112' high side
~ BP Prudhoe Bay E-11BL1 •
CTD Sidetrack Summarv
Rig Work:
1. MIRU and test BOPE
2. Mi113.8" window at 11,112'and 10' of rathole. Swap the well to Flo-Pro.
3. Drill E-11BL1 Build: 4.125" OH, 577' (45deg/100 planned)
4. Drill E-11BL1 Lateral: 4.125" OH, 1641' (12 deg/100 planned), with resistivity
5. Run 3-3/16" x 2-7/8" slotted liner leaving TOL at 11000'
6. Cleanout liner
7. Set 3 3/16" whipstock at 11,550' in E-11BL1
8. Mill window
9. Drill E-11BL1-O1, run liner, leave liner outside window
10. Pull 3 3/16" whipstock
11. Freeze protect well, set BPV, RDMO
Mud Program:
• Well kill: 8.6 ppg brine
• Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 4-1/8"
Casing Program: slotted tapered liner
• 3-3/16", L-80 6.2# TCII blank liner 11,000'-11,600'
• 2-7/8", L-80 6.16# STL slotted liner 11,600'-13,350'
• Contingency bonsai completion:
o A minimum of 5 bbls 15.8 ppg cement will be used for contingency liner cementing.
o TOC planned at top of liner.
Well Control: BOP diagram on file.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will be tested to 250 psi and 2500 psi.
Directional
• See attached directional plan. Max. planned hole angle is 108 deg.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 5,050 ft.
• Distance to nearest well within pool - 959 ft. (E-08A at 12,225')
Logging - MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section.
Aazards
• Losses/wellbore stability problems in fractured Shublik; contingency bonsai liner
• Inadvertent sidetrack in high dog leg severity, high angle penetration of Shublik
• One mapped fault crossing lost circulation risk is high; possibility of faulting into Kingak
• Low weight on bit at TD, plan to use agitator tool
Reservoir Pressure
• The max res. press. is estimated to be 3276 psi at 8800'ss (7.1 ppg EMW).
• Max. surface pressure with gas (0.10 psi/ft) to surface is 2340 psi.
' TREE _
4-1116" CM/
~ E-11 B SH NNO*4E-1/2' CHROM ~g~ ELLBORE NOT
WELL'HEAD = FMC
ACTUATOR= OTIS
KB. FlEV = 68.77'
BF. ElEV = . 30.28'
KOP = 2008'
Max Angle - 51 @ 7437'
Datum MD = 11687'
Datum ND = 9486 S5
13-3/8" CSG, 68#, L-80, ID = 12.415"
Minimum ID = 3.813" @ 2235'
4-1/2" HES X NtPPLE
IWHIPSTOCK(10/15/06) ~ 4$s'I'
EZSV (10(14/06) 4$7$'
9-5/8" CSG, 47#, L-80, ID = 8.681" 10167~
(FROM PARENT WELLBOR~
0
~-tii p,
4-1/2" TBG, 12.6#, 13CR-80,
VAM TOP, .0152 bpf, ID = 3.958" -1 10g63,
7" LNR, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" 11095~
PERFORATION SUMMARY
REF LOG: NNVD ON 10l15-28l06
ANGLE AT TOP PERF: 25 @ 11103'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 11103 - 11153 O 12l08/06
2235~ -~4-1/2" HES X NIP, ID = 3.813" I
GAS LIFf MANDRELS
ST MD ND DEV TYPE V~V LATCH PORT DATE
3 4134 3800 37 KBG2 DOME BK 16 11/28/06
2 7560 6218 50 KBG2 SO BK 20 11/28/06
1 9939 8006 29 KBG2 DMY BK 0 11/28/06
4703' ~9-5l8" X 7" BKRG2 ZXP lTP I
w/ 11.6' TIEBACK SLV, ID = 6.28"
472~ 9-5(8" X 7" BKR FLIX-LOK LNR HGR, ID = 6.32"
MILLOUT WINDOW (E-11B) 4861' - 4$78'
10843~ -i4-1i2" HES X NIP, ID = 3.813" ~
10906~ 7"X 4-1/2" BKR S-3 PKR, ID = 3.870"
10929' ~ 4-1/2" HES X NIP, ID = 3.813"
1094T ~ 7" X 5" BKR G2 ZXP LTP (
w/ TIEBACK SLV, ID = 4.410"
10950~ 4-1 /2" HES X NIP, ID = 3.813"
10963~ 4-1/2" WLEG, ID = 3.875"
10964' 7" X 5" BKR HMC LNR HGR, ID = 4.420"
10971 ~ 5" X 4-1 l2" XO, ID = 4.540"
11600' I-I ~~
4-112" INR, 12.6#, L-80, BTGM, .0152 bpf, ID = 3.958" ~ 11687'
DATE REV BY COMMENTS DATE REV BY COMMENTS
? ORIGINAL COMPLETION
10/24197 JLM SIDETRACK (E-11A)
11/06/06 N2ES SIDETRACK(E-11B)
11/28/06 DAV/TLH TREE CORRECTION & GLV C/O
12l07/06 RRD/TLH INITIAL PERFORATIONS
03/05/07 MWS/PJC DRLG DR,4FTCORRECTIONS
PRUDHOE BAY UNff
WELL: E-11B
PERMff No: ~"2061430
API No: 50-029-20475-02
SEC 6, T11N, R14E, 500' W~ & 463' SNL
BP 6cploration (Alaska)
TRE~= 4-1/16" CAN
WElLHEAD = FMC
ACTUATOR = OTIS
KB. ELEV = 68.77'
BF. ELEV = 30.28'
KOP = 2008'
Max Angle = 51 ~ 7437'
Datum ND = 11687'
Datum ND = 9486 SS
13-3/8" CSG, 68#, L-80, ID = 12.415"
11 BL1 & BL1-01
Proposed CTD Laterats
4-1 /2" HES X NIP, ID = 3.813" ~
GAS LIFT MANDRELS
Minimum ID = 3.813" @ 2235'
4-1/2" HES X NIPPLE
~¢sv ~~a~aios>
9-5/8" CSG, 47#. L-80, ID = 8.681"
FROM PARENT WELLBOREI
I 4861' I
A
ST MD ND DEV TYPE VLV LATCH PORT DATE
3 4134 3800 37 KBG2 DOME BK 16 11128/O6
2 7560 6218 50 KBG2 SO BK 20 11/28/O6
1 9939 8006 29 KBG2 DMY BK 0 11l28/O6
4703' ~ 9-5/8" X 7" BKR G2 ZXP LTP I
w/ 11.6' TIEBACK SLV, ID = 6.28"
4721' 9-5l8" X 7" BKR FLIX-LOK LNR HGR, ID =
MILLOUT WINDOW (E-11 B) 4861' - 4878'
1
C
4-1/2" TBG, 12.6#, 13CR-80, 10963~
VAM TOP, .0152 bpf, ID = 3.958"
~.
7" LNR, 26#, L-80, BTGM, .0383 bpf, ID = 6.276"
PERFOR,4TION SUMMARY
REF LOG: MWD ON 10/15-28/06
A NGLE AT TOP PERF: 25 @ 11103'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" fi 11103 - 11153 ~ 12/08/O6
4-1/2" LNR, 12.6#, L-80, BTGM, .0152 bpf, ID = 3.958"
G3' -~4-1/2" HES X NIP, ID = 3.813" ~
~6' 7"X 4-1/2" BKR S-3 PKR, ID = 3.870"
-~ 4-1/2" HES X NIP, ID = 3.813"
10947' 7" X 5" BKR G2 ZXP LTP
109
1096
109
109
_ _ _ BL1=01_ ~
~ .
B
DATE REV BY COMMENTS DATE REV BY CONhAINfS
? ORIGINAL COMPLETION 02/09/07 PJC DRLG DRAFT CORRECTIONS
10/24/97 JLM SIDETRACK (E-11A) 04/27/07 MSE CTD PROPOSED ~ATERALS
11/06/06 N2ES SIDEfRACK (E-118)
11/28/O6 DAV/TL TREE CORRECTION & GLV C/
12/07/O6 RRDJTLH IN(fIAL PERFORATIONS
PRUDHOE BAY UNff
1N~L: E-1181_1 & B~ ~~ i~'
PERMff No:
API No: 50-029-20475-02
Sec. 6. T11 N, R14E, 500' WEL 8 463' SNL
w/ TIEBACK SLV, ID = 4.410"
50~ 4-1/2" HES X NIP, ID= 3.813"
3' 4-1/2" 1/VLEG, ID = 3.875"
64' 7" X 5" BKR HMC LNR HGR, ID = 4.420"
71~ 5" X 4-1/2" XO,ID = 4.540"
19112' ~ ..:..._
~r.J4.= .,iJa' .VEI . .. .,~.,~ X 2 ..
`~~~T'; BL1
,~ ; ~ --__ - - - -
,~. .
~ i
13350'
//
~ 1 ;5~~u~ ~~~~~~,st~~k_iretneved)
TRE~= 4-1/16" CAN
WELLHEAD = FMC
ACTUATOR = OTIS
KB. QEV = 68.77'
BF. ELEV = 30.28'
KOP = 2008'
Max Angle = 51 ~ 7437'
Datum MO = 11687'
Datum ND = 9486 SS
13-3/8" CSG, 68#, L-80, ~= 12.415" ~~ 2729~
E-11 C& C L 1 S NOTES: NOTE: PAREM W ELLBORE NOT
Contingency CTD Sidetrack sHOwN. •••a-~~2~~ CHROMETBG~
~4-1/2" HES X NIP,ID = 3.813" ~
GAS LIFf MANDRELS
Minimum ID = 3.813" @ 2235'
4-1/2" HES X NIPPLE
~WHPSTOCK(10/15/O6) ~~
¢SV (~a~arOS) 4878'
9-5/8" CSG, 47#, 1-80, D= 8.681" 10167'
'FROM PARQJT WFILBOREI
A
4-1/2" TBG, 12.6#, 13CR-80, I 10963'
VAM TOP, .0152 bpf, ID = 3.958"
~7:;. ~ ; ~ npp~
7" LNR, 26#, L-80, BTC-M, .0383 bpf, ID = 6.276" 11095~
PERFORATION SUMMARY
Rff LOG: NM1ND ON 10/15-28/O6
ANGLE AT TOP PERF: 25 ~ 11103'
Note: Refer to Roductan DB for historical perf data
SIZE SPF ~1TB2VAL Opn/Sqz DATE
3-3l8^ s ~~ ~ os _>>> ss O 19/OR/OR
~4-1/2" LNR, 12.6#, L-80, BTGM, .0152 bpf. ~= 3.958" ~
B
ST MD ND DEV TYPE VLV LATCH PORT DATE
3 4134 3800 37 KBG2 DOME BK 16 11/28/06
2 7560 6218 50 KBG2 SO BK 20 11/28/06
1 9939 8006 29 KBG2 DMY BK 0 11/28/O6
4703~ ~ 9-5/8" X 7" BKR G2 ZXP LTP I
w/ 11.6' TIEBACK SLV, D= 6.28"
4721' 9-5/8" X 7" BKR FLIX-LOK LNR HGR, ID = 6.32"
MILLOUT WINDOW (E-116) 4861' - 4878'
10843' - ~4-1/2" HES X NIP, ID= 3.813" ~
10906~ 7"X 4-1/2" BKR S-3 PFCR, ID = 3.870"
10929~ 4-1 /2" HES X NIP, ID = 3.813"
10947' 7" X 5" BKR G2 ZXP LTP
w/ TIEBACK SLV, ID = 4.410"
10950~ 4-1/2" HES X NIP, ID= 3.813"
10963' ~4-1/2" WLEG, ID= 3.875"~
10964' 7" X 5" BKR HMC LNR HGR, ID = 4.420"
10971' S" x a-~ i2" xo, ID = 4.540"
111fi2' 'Inipstoc'K
11600' 3-3/16" Cemented Liner
\ C
C - - - - -
/ CL1 ~~~
11687' _ _ _ _ _ --~ ~
12900'
2-7 13350'
550~ ~~~-~ ~hipstock~~etrievec~l
DATE REV BY COMMENTS DATE REV BY COMMENTS
? ORIGINAL COMPLETION 02/09/07 PJC DRLG ORAFT CORRECTIONS
10/24/97 JLM SIDEfRACK (E-11A) 04/27/07 MSE CTD PROPOSED LATERALS
11/O6/06 N2ES SIDETRACK(E-11B)
11/28/O6 DAV/ll TREECORRECTION & GLV G
12/07/O6 RRDITLH INffIAL P~2FORATIONS
PRUDHOE BAY UNIT
WELL: E-11C r C! ~~~
PERMff No:
API No: 50-029-20475-??
Sec. 6, T11 N, R14~ 500' WEL 8 463' SNL
~ ~
' ~ ~
bp BP Alaska B~$
~ Baker Hughes INTEQ Planning Report ~~.rTE
Q
Companyd BP Amoco Date: 4/30/2007 Time: 08:27;05 Page: 1
Field: Prudhoe Bay Co-ardinate(NE) Reference: WeIL• E-11,True North
Site: PB E Pad Vertical ('PVD) Reference: E-11 Bt 57.8
We1L• E-11 Section (VS) Reference: Well (O.OON,O.OOE,7Q.OOAzi}
Wellpath: Plan 7, E-11 BL1 Survey Calculation Method; Minimum Curvature Db: OraCle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic ModeL• bggm2006
Site: PB E Pad
TR-11-14
UNITED STATES : North Slope
Site Position: Northing: 5973160.88 ft Latitude: 70 19 59.134 N
From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.24 deg
Well: E-11 Slot Name: 11
E-11
Well Position: +N/-S 3398.09 ft Northing: 5976601.00 ft LaNtude: 70 20 32.551 N
+E/-W 1987.27 ft Easting : 664452.00 ft Longitude: 148 39 54.999 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 7, E-11 BLi Drilled From: E-11 B
Tie-on Depth: 11101.36 ft
Current Datum: E-11 B: Height 57.83 ft Above System Datum: Mean Sea Level
Magnetic Data: 3/12/2007 Declination: 24.04 deg
Field Strength: 57661 nT Mag Dip Angle: 80.96 deg
Vertical Section: Depth From (TVD) +N/-S +FJ-W Direction
ft ft ft deg
25.80 0.00 0.00 70.00
Plan: Plan #7 Date Composed: 3/12/2007
weil name change in plan 7 Version: 9
Principal: Yes Tied-to: From: Definitive Path
Targets
Name Description
Dip. Dir.
TVD
ft
+N/S
ft
+E/-W
ft Map
Northing
ft Map
Fasting
ft <---- Latitude ---a
Deg Min Sec <--- Longitude --•>
Deg Min Sec
E-11 C Fault 1 57.83 5181.40 2015.28 5981825.00 666353.00 70 21 23.507 N 148 38 56.086 W
-Polygon 1 57.83 5181.40 2015.28 5981825.00 666353.00 70 21 23.507 N 148 38 56.086 W
-Polygon 2 57.83 4307.76 3126.46 5980976.00 667483.00 70 21 14.911 N 148 38 23.613 W
E-11 C Fault 2 57.83 6492.18 3320.44 5983164.01 667629.00 70 21 36.394 N 148 38 17.914 W
-Polygon 1 57.83 6492.18 3320.44 5983164.01 667629.00 70 21 36.394 N 148 38 17.914 W
-Polygon 2 57.83 5573.12 3538.35 5982250.01 667867.00 70 21 27.354 N 148 38 11.556 W
-Polygon 3 57.83 4569.63 3774.41 5981252.01 668125.00 70 21 17.484 N 148 38 4.669 W
E-11 C Fault 5 57.83 4501.09 -806.52 5981083.00 663547.00 70 21 16.819 N 148 40 18.574 W
-Polygon 1 57.83 4501.09 -806.52 5981083.00 663547.00 70 21 16.819 N 148 40 18.574 W
-Polygon 2 57.83 4478.27 -85.79 5981076.00 664268.00 70 21 16.595 N 148 39 57.507 W
-Polygon 3 57.83 5065.11 1069.44 5981688.00 665410.00 70 21 22.365 N 148 39 23.736 W
-Polygon 4 57.83 5214.07 2031.00 5981858.00 666368.00 70 21 23.828 N 148 38 55.626 W
-Polygon 5 57.83 5065.11 1069.44 5981688.00 665410.00 70 21 22.365 N 148 39 23.736 W
-Polygon 6 57.83 4478.27 -85.79 5981076.00 664268.00 70 21 16.595 N 148 39 57.507 W
E-11C Fault 4 57.83 5148.42 1740.47 5981786.00 666079.00 70 21 23.183 N 148 39 4.119 W
-Polygon 1 57.83 5148.42 1740.47 5981786.00 666079.00 70 21 23.183 N 148 39 4.119 W
-Polygon 2 57.83 5386.07 2945.06 5982050.00 667278.00 70 21 25.517 N 148 38 28.903 W
-Polygon 3 57.83 5579.13 3765.55 5982261.00 668094.00 70 21 27.412 N 148 38 4.913 W
-Polygon 4 57.83 5650.03 4136.22 5982340.00 668463.00 70 21 28.107 N 148 37 54.076 W
-Polygon 5 57.83 5909.66 4886.15 5982616.00 669207.00 70 21 30.656 N 148 37 32.146 W
-Polygon 6 57.83 5650.03 4136.22 5982340.00 668463.00 70 21 28.107 N 148 37 54.076 W
-Polygon 7 57.83 5579.13 3765.55 5982261.00 668094.00 70 21 27.412 N 148 38 4.913 W
-Polygon 8 57.83 5386.07 2945.06 5982050.00 667278.00 70 21 25.517 N 148 38 28.903 W
E-11 C Fault 3 57.83 2967.54 -894.18 5979548.00 663493.00 70 21 1.736 N 148 40 21.132 W
~ ~
bp BP Alaska ~~
~ Baker Hughes INTEQ Planning Report ~r,TE
Q
Company: $P Amoco Date: 4/30/2007 Time: 08;27:05 i Page: ' 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell: E-11 , True North
Site: PB E Pad Vertical ('f VD) Reference: E- 11 B: 57. 8
Well: E-11 Section (VS) Reference: W ell (O. OON,O'.OOE,70.OOAzi)
Wellpath: Plan 7, E-11$L1 Survey Calculation Metl~od: M inimum Curvature Db: Oracle
Targets
Map MaP <--° Latitude ----> z-° Longitude --->
Name Description TVD +N/-S +FJ-W Northing Easting Deg Min Sec Deg Min 'Sec
Dip. Dir. ft ft ft ft ft
-Polygon 1 57.83 2967.54 -894.18 5979548.00 663493.00 70 21 1.736 N 148 40 21.132 W
-Polygon 2 57.83 3430.34 671.45 5980045.00 665048.00 70 21 6.288 N 148 39 35.375 W
-Polygon 3 57.83 4120.55 2814.26 5980782.00 667175.00 70 21 13.071 N 148 38 32.740 W
-Polygon 4 57.83 4582.65 3955.75 5981269.00 668306.00 70 21 17.611 N 148 37 59.368 W
-Polygon 5 57.83 5250.29 6170.08 5981985.00 670505.00 70 21 24.162 N 148 36 54.625 W
-Polygon 6 57.83 4582.65 3955.75 5981269.00 668306.00 70 21 17.611 N 148 37 59.368 W
-Polygon 7 57.83 4120.55 2814.26 5980782.00 667175.00 70 21 13.071 N 148 38 32.740 W
-Polygon 8 57.83 3430.34 671.45 5980045.00 665048.00 70 21 6.288 N 148 39 35.375 W
E-11 C Polygon 57.83 4758.67 1997.00 5981402.00 666344.00 70 21 19.350 N 148 38 56.623 W
-Polygon 1 57.83 4758.67 1997.00 5981402.00 666344.00 70 21 19.350 N 148 38 56.623 W
-Polygon 2 57.83 4675.90 1803.13 5981315.00 666152.00 70 21 18.536 N 148 39 2.291 W
-Polygon 3 57.83 4445.13 1926.10 5981087.00 666280.00 70 21 16266 N 148 38 58.698 W
-Polygon 4 57.83 4387.50 2318.96 5981038.00 666674.00 70 21 15.698 N 148 38 47.215 W
-Polygon 5 57.83 4613.26 2880.09 5981276.00 667230.00 70 21 17.917 N 148 38 30.811 W
-Polygon 6 57.83 5120.72 3595.44 5981799.00 667934.00 70 21 22.904 N 148 38 9.893 W
-Polygon 7 57.83 5240.45 3974.18 5981927.00 668310.00 70 21 24.080 N 148 37 58.819 W
-Polygon 8 57.83 5415.76 3917.01 5982101.00 668249.00 70 21 25.804 N 148 38 0.488 W
-Polygon 9 57.83 5349.36 3569.45 5982027.00 667903.00 70 21 25.153 N 148 38 10.650 W
-Polygon 10 57.83 5166.42 3245.33 5981837.00 667583.00 70 21 23.355 N 148 38 20.127 W
-Polygon 11 57.83 4598.82 2170.55 5981246.00 666521.00 70 21 17.777 N 148 38 51.551 W
E-11 C Target 2 9049.83 4721.94 1893.17 5981363.00 666241.00 70 21 18.989 N 148 38 59.659 W
E-11 C Target 3 9050.83 4485.96 2117.06 5981132.00 666470.00 70 21 16.667 N 148 38 53.116 W
E-11 C Target 4 9062.83 4643.80 2627.68 5981301.00 666977.00 70 21 18.218 N 148 38 38.189 W
E-11 C Target 6 9064.83 5088.75 3365.67 5981762.00 667705.00 70 21 22.591 N 148 38 16.610 W
E-11C Target 5 9081.83 4831.46 2964.90 5981496.00 667310.00 70 21 20.062 N 148 38 28.329 W
E-11 C Target 1 9112.83 4786.12 2113.64 5981432.00 666460.00 70 21 19.619 N 148 38 53.213 W
Annotation
MD TVD
ft ft
11101.36 9022.56 TIP
11112.00 9032.20 KOP
11132.00 9050.17 End of 9 Deg/100' DLS
11319.00 9117.01 4
11394.00 9093.29 5
11484.00 9065.62 6
11609.00 9049.47 7
11709.00 9050.54 End of 45 Deg/100' DLS
11909.00 9050.90 9
12327.00 9062.37 10
12402.00 9062.85 11
12527.00 9066.42 12
12652.00 9075.21 13
i 2777.00 9081.45 14
12827.00 9081.78 15
13127.00 9074.09 16
13350.00 9063.88 TD
~ ~
bp BP Alaska ~S
~ Baker Hughes INTEQ Planning Report ~r,TE
Q
Companyd BP Amoco Date. 4/30/2007 TSme: 08:27:05 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: WeII: E=11, True North
Site: PB E Pad Verticat (TVD) Reference: E 11 Bt-57.8
We1L• E-11 Section (VS) Reference: W elt (O.OON,~.OO E,70.OOAzi)
Welipath: Plan 7, E-11$L1 Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft degl100ft deg/100ft deg/100ft deg
11101.36 24.85 331.90 9022.56 4690.02 2197.81 0.00 0.00 0.00 0.00
11112.00 25.21 331.90 9032.20 4693.99 2195.69 3.38 3.38 0.00 0.00
11132.00 26.91 330.54 9050.17 4701.68 2191.46 9.00 8.49 -6.80 340.00
11319.00 108.07 302.18 9117.01 4805.17 2073.38 45.00 43.40 -15.17 333.00
11394.00 107.70 266.66 9093.29 4822.58 2005.57 45.00 -0.50 -47.36 275.00
11484.00 106.56 22421 9065.62 4787.69 1929.50 45.00 -1.26 -47.17 275.00
11609.00 87.26 170.69 9049.47 4673.85 1895.02 45.00 -15.45 -42.82 255.00
11709.00 91.59 125.88 9050.54 4590.97 1946.26 45.00 4.33 -44.80 275.00
11909.00 88.21 102.12 9050.90 4510.21 2127.64 12.00 -1.69 -11.88 262.00
12327.00 88.85 51.94 9062.37 4601.05 2521.93 12.00 0.15 -12.00 270.00
12402.00 90.42 60.81 9062.85 4642.54 2584.31 12.00 2.09 11.82 80.00
12527.00 86.32 75.24 9066.42 4689.18 2699.85 12.00 -3.28 11.55 106.00
12652.00 85.67 6022 9075.21 4736.29 2814.91 12.00 -0.52 -12.02 267.00
12777.00 88.64 45.50 9081.45 4811.47 2914.13 12.00 2.38 -11.78 281.00
12827.00 90.60 39.82 9081.78 4848.22 2948.00 12.00 3.91 -11.34 289.00
13127.00 92.25 75.80 9074.09 5005.38 3197.63 12.00 0.55 11.99 87.00
13350.00 92.91 49.02 9063.88 5107.61 3393.28 12.00 0.30 -12.01 272.00
Survey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft degh OOft ft deg
11101.36 24.85 331.90 8964.73 4690.02 2197.81 5981337.77 666546.25 0.00 3669.34 0.00 MW D
11112.00 2521 331.90 8974.37 4693.99 2195.69 5981341.70 666544.04 3.38 3668.71 0.00 MW D
11125.00 26.31 331.00 8986.08 4698.95 2192.99 5981346.60 666541.23 9.00 3667.87 340.00 MW D
11131.62 26.88 330.56 8992.00 4701.54 2191.54 5981349.15 666539.73 9.00 3667.39 340.81 E-11 C
11132.00 26.91 330.54 8992.34 4701.68 2191.46 5981349.30 666539.64 9.00 3667.37 341.20 MWD
11132.74 27.21 330.21 8993.00 4701.98 2191.29 5981349.59 666539.47 45.00 3667.31 333.00 E-11 C
11146.61 32.89 325.05 9005.00 4707.82 2187.55 5981355.35 666535.61 45.00 3665.80 333.30 E-11 C
11149.00 33.89 324.32 9007.00 4708.90 2186.79 5981356.41 666534.82 45.00 3665.45 337.77 E-11 C
11150.00 34.31 324.02 9007.83 4709.35 2186.46 5981356.85 666534.48 45.00 3665.30 338.38 MWD
11170.74 43.12 319.06 9024.00 4719.46 2178.37 5981366.78 666526.17 45.00 3661.14 338.62 E-11 C
11175.00 44.95 318.25 9027.06 4721.68 2176.41 5981368.96 666524.17 45.00 3660.07 342.51 MW D
11200.00 55.79 314.31 9042.99 4735.53 2163.09 5981382.51 666510.55 45.00 3652.29 343.09 MW D
11225.00 66.72 311.29 9054.99 4750.38 2147.02 5981397.00 666494.15 45.00 3642.26 345.61 MW D
11225.02 66.73 311.28 9055.00 4750.39 2147.00 5981397.01 666494.14 45.00 3642.25 347.08 E-11 C
11250.00 77.70 308.73 9062.62 4765.64 2128.80 5981411.86 666475.61 45.00 3630.36 347.08 MWD
11275.00 88.71 306.38 9065.57 4780.74 2109.15 5981426.53 666455.63 45.00 3617.06 347.86 MWD
11300.00 99.72 304.04 9063.74 4795.10 2088.81 5981440.43 666434.98 45.00 3602.86 348.14 MW D
11319.00 108.07 302.18 9059.18 4805.17 2073.38 5981450.16 666419.33 45.00 3591.81 347.97 MW D
11325.00 108.29 299.34 9057.31 4808.08 2068.48 5981452.97 666414.37 45.00 3588.20 275.00 MW D
11350.00 108.73 287.49 9049.34 4817.49 2046.78 5981461.89 666392.47 45.00 3571.02 274.12 MW D
11375.00 108.42 275.62 9041.36 4822.22 2023.61 5981466.12 666369.20 45.00 3550.87 270.34 MW D
11394.00 107.70 266.66 9035.46 4822.58 2005.57 5981466.08 666351.16 45.00 3534.04 266.55 MW D
11400.00 107.91 263.83 9033.62 4822.10 1999.88 5981465.48 666345.48 45.00 3528.53 275.00 MW D
11425.00 108.36 252.00 9025.81 4817.14 1976.69 5981460.01 666322.42 45.00 3505.05 274.14 MWD
11450.00 108.08 240.16 9017.97 4807.53 1955.04 5981449.93 666300.97 45.00 3481.41 270.44 MWD
11475.00 107.09 228.40 9010.39 4793.64 1935.73 5981435.62 666281.98 45.00 3458.52 266.73 MWD
11484.00 106.56 224.21 9007.79 4787.69 1929.50 5981429.54 666275.89 45.00 3450.63 263.16 MW D
11500.00 104.58 217.02 9003.48 4776.00 1919.48 5981417.62 666266.12 45.00 3437.21 255.00 MW D
11525.00 101.06 206.06 8997.92 4755.25 1906.77 5981396.61 666253.87 45.00 3418.17 253.07 MW D
11550.00 97.16 195.37 8993.95 4732.20 1898.07 5981373.37 666245.68 45.00 3402.11 250.63 MW D
11575.00 93.02 184.86 8991.73 4707.72 1893.71 5981348.81 666241.85 45.00 3389.64 248.93 MWD
11600.00 88.78 174.44 8991.33 4682.77 1893.86 5981323.86 666242.56 45.00 3381.25 247.99 MWD
11609.00 87.26 170.69 8991.64 4673.85 1895.02 5981314.97 666243.91 45.00 3379.29 247.83 MWD
11625.00 87.90 163.51 8992.32 465828 1898.59 5981299.48 666247.82 45.00 3377.32 275.00 MW D
11650.00 88.98 152.31 8993.00 4635.16 1907.98 5981276.58 666257.71 45.00 337823 275.30 MW D
~ ~
bp BP Alaska ~$
~ Baker Hughes INTEQ Planning Report ~.rTE
Q
Company: BP Amoco Date: 4l30/2007 Time: 0827:05 Page: 4
Field: Prudhoe$ay Co-ordinate(NE) Reference: Well: E-11, True North
Site: PB E Pad Vertical (TVD) Reference: E-11 B: 57.8 '
Well: E-1 1 Section (VS) Reference: Well (O.OON,O.OO E,70.OOAzi)
Wellpath: Plan 7, E-11 BL1 Survey Calculation Method: Minimum Curvature Db: Oracls
Survey
MD Incl Azim SS TVD N/S FJW MapN MapE DLS VS 1'FO . Tool
ft deg deg ft ft ft ft ft deg/1QOft ft deg
11675.00 90.09 141.11 899321 4614.30 1921.68 5981256.02 666271.86 45.00 3383.97 275.61 MWD
11700.00 91.20 129.91 8992.93 4596.49 1939.17 5981238.61 666289.74 45.00 3394.31 275.70 MWD
11709.00 91.59 125.88 8992.71 4590.97 1946.26 5981233.24 666296.96 45.00 3399.09 275.58 MWD
11725.00 91.32 123.98 8992.30 4581.81 1959.38 5981224.37 666310.27 12.00 3408.28 262.00 MWD
11750.00 90.90 121.01 8991.82 4568.38 1980.46 5981211.41 666331.63 12.00 3423.50 261.95 MWD
11775.00 90.47 118.04 8991.52 4556.07 2002.21 5981199.57 666353.65 12.00 3439.73 261.89 MWD
11800.00 90.05 115.07 8991.41 4544.89 2024.57 5981188.89 666376.25 12.00 3456.92 261.86 MWD
11825.00 89.62 112.10 8991.48 4534.89 2047.48 5981179.40 666399.37 12.00 3475.02 261.85 MWD
11850.00 89.20 109.13 8991.73 4526.09 2070.87 5981171.11 666422.95 12.00 3494.00 261.85 MWD
11875.00 88.78 106.16 8992.18 4518.51 2094.69 5981164.06 666446.92 12.00 3513.79 261.88 MWD
11900.00 88.36 103.19 8992.80 4512.18 2118.86 5981158.26 666471.23 12.00 3534.34 261.94 MWD
11909.00 88.21 102.12 8993.07 4510.21 2127.64 5981156.49 666480.05 12.00 3541.91 262.01 MWD
11925.00 88.21 100.20 8993.57 4507.12 2143.33 5981153.74 666495.80 12.00 3555.60 270.00 MW D
11950.00 88.21 97.20 8994.35 4503.34 2168.03 5981150.50 666520.57 12.00 3577.51 270.06 MW D
11975.00 88.22 94.19 8995.13 4500.86 2192.89 5981148.57 666545.48 12.00 3600.03 270.15 MW D
12000.00 88.24 91.19 8995.90 4499.69 2217.85 5981147.94 666570.46 12.00 3623,08 270.25 MW D
12025.00 88.26 88.19 8996.67 4499.82 2242.83 5981148.63 666595.43 12.00 3646.60 270.34 MW D
12050.00 8828 85.19 8997.42 450127 2267.78 5981150.62 666620.34 12.00 3670.54 270.43 MW D
12075.00 88.31 82.19 8998.16 4504.01 2292.61 5981153.91 666645.10 12.00 3694.81 270.52 MW D
12100.00 88.35 79.19 8998.89 4508.06 2317.27 5981158.49 666669.66 12.00 3719.37 270.61 MW D
12125.00 88.39 76.19 8999.60 4513.38 2341.68 5981164.35 666693.95 12.00 3744.13 270.70 MW D
12150.00 88.43 73.19 9000.30 4519.98 2365.78 5981171.48 666717.90 12.00 3769.03 270.78 MWD
12175.00 88.48 70.18 9000.97 4527.84 2389.50 5981179.85 666741.44 12.00 3794.01 270.87 MWD
12200.00 88.53 67.18 9001.62 4536.92 2412.78 5981189.44 666764.51 12.00 3818.99 270.95 MWD
12225.00 88.59 64.18 9002.25 4547.21 2435.55 5981200.22 666787.05 12.00 3843.91 271.03 MWD
12250.00 88.65 61.18 9002.86 4558.68 2457.76 5981212.18 666809.00 12.00 3868.70 271.10 MWD
12275.00 88.71 58.18 9003.43 4571.29 2479.33 5981225.26 666830.29 12.00 3893.28 271.17 MWD
12300.00 88.78 55.18 9003.98 4585.02 2500.21 5981239.44 666850.86 12.00 3917.60 271.24 MWD
12325.00 88.85 52.18 9004.50 4599.82 2520.35 5981254.68 666870.67 12.00 3941.59 271.31 MWD
12327.00 88.85 51.94 9004.54 4601.05 2521.93 5981255.94 666872.22 12.00 3943.49 271.37 MWD
12350.00 89.33 54.66 9004.91 4614.79 2540.37 5981270.08 666890.35 12.00 3965.51 80.00 MWD
12375.00 89.86 57.62 9005.08 4628.72 2561.12 5981284.46 666910.80 12.00 3989.78 79.96 MWD
12400.00 90.38 60.57 9005.03 4641.56 2582.57 5981297.77 666931.96 12.00 4014.33 79.94 MWD
12402.00 90.42 60.81 9005.02 4642.54 2584.31 5981298.79 666933.68 12.00 4016.30 79.94 MWD
12425.00 89.66 63.46 9005.00 4653.29 2604.65 5981309.98 666953.77 12.00 4039.08 106.00 MWD
12450.00 88.83 66.34 9005.33 4663.89 262728 5981321.07 666976.16 12.00 4063.98 106.00 MWD
12475.00 88.01 69.23 9006.02 4673.34 2650.41 5981331.03 666999.08 12.00 4088.95 105.96 MWD
12500.00 87.19 72.12 9007.06 4681.60 2673.98 5981339.81 667022.46 12.00 4113.92 105.88 MW D
12525.00 86.38 75.01 9008.46 4688.66 2697.92 5981347.39 66704623 12.00 4138.83 105.76 MW D
12527.00 86.32 75.24 9008.59 4689.18 2699.85 5981347.94 667048.15 12.00 4140.82 105.60 MW D
12550.00 86.18 72.48 9010.10 4695.55 2721.89 5981354.80 667070.05 12.00 4163.72 267.00 MW D
12575.00 86.04 69.48 9011.80 4703.68 2745.47 5981363.45 667093.44 12.00 4188.65 267.18 MW D
12600.00 85.90 66.47 9013.55 4713.03 2768.59 5981373.30 667116.34 12.00 4213.57 267.38 MW D
12625.00 85.78 63.47 9015.36 4723.58 2791.17 5981384.34 667138.70 12.00 4238.41 267.60 MW D
12650.00 85.68 60.46 9017.23 4735.30 2813.18 5981396.54 667160.43 12.00 4263.09 267.81 MWD
12652.00 85.67 60.22 9017.38 4736.29 2814.91 5981397.56 667162.15 12.00 4265.06 268.04 MWD
12675.00 86.20 57.50 9019.01 4748.15 2834.54 5981409.85 667181.51 12.00 4287.56 281.00 MWD
12700.00 86.79 54.56 9020.54 4762.09 2855.24 5981424.24 667201.89 12.00 4311.78 281.19 MWD
12725.00 87.38 51.61 9021.81 4777.08 2875.20 5981439.67 667221.52 12.00 4335.66 281.37 MWD
12750.00 87.98 48.67 9022.82 4793.09 2894.37 5981456.10 667240.33 12.00 4359.15 281.52 MWD
12775.00 88.59 45.73 9023.57 4810.07 2912.70 5981473.47 66725829 12.00 4382.19 281.64 MWD
12777.00 88.64 45.50 9023.62 4811.47 2914.13 5981474.90 667259.69 12.00 4384.01 281.73 MW D
~ ~
bp BP Alaska ~~
~ Baker ~-Iughes INTEQ Planning Report
INTEQ
Company: BP Amoco Date: 4/30/2007 Time: 0827:05 Page: 5
Field: PrudhoeBay Co-ordinate(NE}Reference: WeIL- E-11, True North
Site: PB E Pad Vertical (TVD) Reference: E-t1B: 57.8
WeIL• E-1 1 Section (VS) Reference: W ell (O.OON,O.OO E,70.OOAzi)
Wellpath: Plan 7, E-11$Lt Survey CatculaGon Method: Minimum Curvature I)b: Oracle
Survey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
12800.00 89.54 42.89 9023.98 4827.95 2930.16 5981491.73 667275.35 12.00 4404.71 289.00 MWD
12825.00 90.52 40.05 9023.97 4846.68 2946.71 5981510.82 667291.49 12.00 4426.67 289.04 MWD
12827.00 90.60 39.82 9023.95 4848.22 2948.00 5981512.38 667292.74 12.00 4428.40 289.04 MWD
12850.00 90.74 42.58 9023.68 4865.52 2963.15 5981530.01 667307.50 12.00 4448.55 87.00 MWD
12875.00 90.89 45.58 9023.33 4883.47 2980.53 5981548.34 667324.49 12.00 4471.03 87.03 MWD
12900.00 91.05 48.57 9022.90 4900.50 2998.84 5981565.76 667342.41 12.00 4494.05 87.07 MWD
12925.00 91.20 51.57 9022.41 4916.54 3018.00 5981582.21 667361.22 12.00 4517.55 87.13 MWD
12950.00 91.34 54.57 9021.86 4931.55 3037.98 5981597.66 667380.86 12.00 4541.46 87.18 MWD
12975.00 91.48 57.57 9021.24 4945.50 3058.71 5981612.06 667401.28 12.00 4565.71 87.25 MWD
13000.00 91.62 60.56 9020.57 4958.35 3080.15 5981625.37 667422.43 12.00 4590.25 87.32 MWD
13025.00 91.75 63.56 9019.83 4970.05 3102.22 5981637.56 667444.24 12.00 4614.99 87.41 MWD
13050.00 91.88 66.56 9019.04 4980.59 3124.88 5981648.59 667466.66 12.00 4639.88 87.49 MWD
13075.00 92.01 69.56 9018.19 4989.92 3148.05 5981658.43 667489.62 12.00 4664.85 87.59 MWD
13100.00 92.12 72.56 9017.29 4998.03 3171.68 5981667.05 667513.06 12.00 4689.83 87.69 MWD
13125.00 92.24 75.56 9016.34 5004.89 3195.70 5981674.44 667536.92 12.00 4714.75 87.80 MWD
13127.00 92.25 75.80 9016.26 5005.38 3197.63 5981674.97 667538.85 12.00 4716.73 87.91 MWD
13150.00 92.34 73.04 9015.34 5011.56 3219.77 5981681.63 667560.84 12.00 4739.65 272.00 MWD
13175.00 92.44 70.04 9014.30 5019.47 3243.46 5981690.06 667584.35 12.00 4764.61 271.89 MWD
13200.00 92.52 67.04 9013.21 5028.60 3266.70 5981699.70 667607.38 12.00 4789.58 271.76 MWD
13225.00 92.61 64.03 9012.09 5038.94 3289.43 5981710.54 667629.88 12.00 4814.47 271.63 MWD
13250.00 92.68 61.03 9010.94 5050.46 3311.59 5981722.54 667651.78 12.00 483923 271.50 MWD
13275.00 92.75 58.03 9009.76 5063.12 3333.11 5981735.67 667673.01 12.00 4863.79 271.36 MWD
13300.00 92.81 55.03 9008.54 5076.89 3353.93 5981749.89 667693.53 12.00 4888.07 271.22 MWD
13325.00 92.86 52.02 9007.31 5091.73 3374.01 5981765.17 667713.27 12.00 4912.01 271.07 MWD
13350.00 92.91 49.02 9006.05 5107.61 3393.28 5981781.46 667732.19 12.00 4935.54 270.93 3 3/16"
• ~- ~= - i ~ ~ ~_~~ - ~ ~~_
Y Alaska Department of Natural Resources Land Administration System Page 1 of 3
~ ~
, ~~ ~ ~
, _ ~~~ ~ ~~~~ ~~~d~r`s ~~arch state cabins 141atue~~ ~~u1~e~ ~~
,...~..E~.. . . .. ...., , __...__... ~
o~;-~. :~~~ ...,,.. ~ _
Alask~ D~IR Case aummary
File Type. AD~ ; File Number: ~?8?99 ~+ Printable Case File_Summary
See Township, Range, Section and Acreage? ~
~ Yes ~"'= No .:r ~ ~~~~. ~
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28299&... 5/8/2007
Alaska Department of Natural Resources Land Administration System Page 2 of 3
~ ~
http://www.dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28299&... 5/8/2007
~ - - -
~ , Alaska Department of Natural Resources Land Administration System Page 3 of 3
~ ~
1~nd of Case 5ummary
Last updated on 05/08/2007.
Not sure who to contact? Have a question about DNR? Visit the f~u_blic In~t~r~rt~atic~n Centc~r.
Report technical problems with this page to the i~J~~rrtaster.
Site optimized for Netscape 7, IE 6 or above.
This site also requires that all Cc`~C~KIFS must be accepted.
State of Afas#ca Natural Reso~srces LRS Home Copyrigh# Rrivacy System Sfiatus
_ _ _
http: //www.dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28299&... 5/8/2007
~
PERMIT TO DRILL
20 AAC 25.005
•
(e) Each well branch requires a separate Permit to Drill. If a previously drilled well is proposed to be
redrilled below the structural or conductor casing to a n~w bottom-hole location, the application for a
Permit to Drill must be accompanied by ail items required under (c) of this section. If concurrent multiple
well branches are proposed from a single conductor, surface, or production casing,
(2) for each other well branch, the application for a Permit to Drill need only include information under (c)
of this section that is unique to that well branch and need not be accompanied by the $100 fee.
~ ~
~'~tA~iSl~I1~'~'Ai. LET'~'Elt ~H~CKLIS'I'
w~~.~, r~~tE ~,~~/ ~= 1~~L
~~-D# ao~o,~l0
/Devetopment Service Exptoratory• Stratigraphic Test
Yon-Conventiona[ Wetl
Circle 4ppropriate Letter / Paragraphs to be Inctuded in Transmitta! Letter
' CHECK ~ ADD-ONS
,' Vb'HAT ~ (OPTIONS)
, APPLIES I
TEXT FOR APPROVAL LETTER
; I MULTI LAT'ERAL ~ The permit is for a new we[Ibore segment of existing ~
I / ~ wel l ~.~~ ~ ~~~ ~
~ ,~/ ~(If (ast two digits in ~ ;
, I Permit No.o~Y/ , AP[ No. ~0-~-o?G~~~S~ 00.
; ; API number are ; i
; between 60-69) Production shou[d continue to be reported as a function of the i
' , ~ original API number ,tated above.
i ; ;
~
~ P[LOT HOLE i In accordance with 20 AAC 2~.00~(~, ali records, data and lo~s ;
i ; ; acquired for the pilot hole must be clear(y differentiated in both ~
i i ; we(( name ( PF~ and API aumber ~
j ~ '(~0- - -_) from records, data and logs ~
I i I acquired for we(t ~
i ~ SPACING
' EXCEPTION
~ ;
; i
' i
I I I'he permit is approved subject to full compliance with 20 AAC ~
~ 2~.0». Approval to perforate and produce / iniect is contingent ~
! upon issuance of a conservation order approving a spacing j
; exception. assumes the ~
i liability of any protest to the spacing exception that may occur. ~
;
' ; DRY DITCH ~
~ All dry ditch sample sets submitted to the Commission must be in ;
i i SA!~IPLE I no grearer than 30' samp(e intervals &om betow the permafrost or i
~ ! I from where samptes are first caught and 10' sample intervals j
~
; ;
~ through target zones. ;
; ~
N
f
C ;' Please note the following. specia! condition of this permir: ;
, j
on-
onventiona
~ i production or production testing of coal bed methane is not allowed i
~ I~'~'
z«
i ~ for (name of well) until after (Companv Iv`ame) has designed and !
~ ' imp(emented a water well testing program to provide baseline data
I
~ j ; on water quality and quantity. (Com~y Name) must contact the
~ ~ Commission to obtain advance approval of such water welf testing !
i I ~ program. ~
Rev: 1 '2~i06
C:! jody~[ransmitta!_checkli~[
Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT E-11 BLt Program DEV Well bore seg ^
PTD#:2070610 Company BP EXPLORATION_(ALASKA) INC Initial ClasslType DEV! PEND GeoArea 890 Unit 11650 ONOff Shore On Annular Disposal ^
Administration 1 Perm~_feeattached____________________________________ _____ Yes___ __ _._
2 Lease number appropriate_ _ _ . _ . _ _ _ Yes _ _ _ _ _ _
I3 Uniquewell_nameandnumber_____________________________ _________ Yes______ __...._
4 Welilocatedin_a_defined_pool_____________________,__.__,_ __ __ __ Yes. . PRUDHOEBAYFIELD-PRUDHOEBAYPOOL.._ ___ ______.__._. ______________ ___
5 WelUocatedp[operdistancefromdrillingunitboundary_______________ _____ Yes._.__. .._-_______.._..._____._---____._....
-
6 Well.located proper distance from other welis_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _
7 Su_fficientacreage.ayailablein_drillingunit______________ _______ __.___.__ Yes_____. _____________.._.___,_
-
S Ifdeviated,iswellboreplat_included__________________________ ______ __Yes__.__. _
-
9 Operatoronlyaffectedparty_________________
_... Yes___. _
- _.
10 Opetatorhas_appropriate_bondinfqrce_____________________._ _________Yes._.__. _BLANKETBOND_#61941~3_____________,_______,_________..,.._________,_____
11 Permitcanbeissuedwithoulconservationorder___________________ _________ Yes______ _____.,______________...__._______
Appr Date 12 Petmit ean be issued withoul administrative.app[oval _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . . _ _
ACS 5/8/2007 13 Can permit be approved before 15-day wait Yes
14 Well located within area and_strata authorized by_ Injection Order #(put 10# in_comments)_ (For_ Yes _ AI_0_4 __.__.__._
-.
( 15 All welis_within 1/4_ mile area_of reyiew identified (For service well only)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ . _ _ _ _ _ . _ _ , _ _ _ _ _ _ _ _ _ . . _
-- --- - - - -- - -- --
16 Pre-produced injector; duCation.of pre-pro_duction less than 3 months_ (Fgr_se[vice well only) _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _
- -
17 Nonconyen, gas conforms to A$31,05,030(j.1_.A),(~.2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _
.
Engineering 18 Conductorst[ing_p_rovitled_________________________ ______ _________NA______ _CondpctorsetinE-1118_0-054,_.___.___
~ ~
19 Surfacecasingprotectsall_knownUSDWs______________________ _________ NA__. .__ _Aquifgrsexempled,A101,_____ _______.______ ______._..____.._______________
20 CMT_vol adequate_to circulate_on conductor & su_rf csg _ . , _ _ _ _ _ _ _ _ _ _ _ _N_A_ _ _ . _ _ _ _ $urf_ace ca_sin set in E•11. _ `
g
21 CMT.vol adequate to tie-in_long string to su_rf csg_ _ _ . _ _ _ _ _ _ _ . NA_ , _ _ _ . _ Pr_oduction_casin set in_E-11. ]" & 4-112" liners set in_E-11_B 206-143, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9. ( )
22 CMT_will coyer.all known_protluctive h4rizon_s_ _______ N_o_ ______ _$lotted lin@r completion pl_anned, Although, partially cemented liner is an_option_due to_ lost circulation,
23 Casing desyns adequate for C,_T, B &_ permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA. _ . _ _ _ _ O[iqinal well_and sidet[acks_met desi n_s ecifications. _ NA for slotted liner._ _ . _ _ _ _ , _ _ _ _ _ _ _ _ _
9 P
24 Adequate tankage_or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Rig is_equipped with st_eel_pits. No reserve_pit_pianned. AIf waste to approyed disposal wells._ _ _ . . _ _ . _ _ _
25 If_a_ re-d[ill, has_a 10-4~3 for abandonment been approved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ Existing perf_orated interval will be retained, _ _ _ _ _ _ _ . _ _ . _ _ , . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . .
26 Adequate wellbore separation_proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Proximity_ analysis performed, No close approach issues identifed. _ _ . . _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
27 Ifdiverterrequired,doesitmeetregulations________________ _____ _____ NA_____._ _BOPstackwillalready_be_inplaee:._.______________._._.________,___.____.,_.___
Appr Date 28 Drilling fluid_ program schematic,& equip list adequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Maximum expected fo[matipn pressu[e 7,1_ EMW, PI_anned MW 8 6 ppg._ _ _ _ _ _ _ _ _ . _ , _ _ _ . _ _ , _ _ _ . _ .
TEM 5/10/2007 29 BOPEs,.dotheymeekregulation-----_------------_..._--- ----- Yes--_-- - ------ _-------------- --
,~q'~ ~I
~ ~~ 30 .BOPE_press rating appropriate; test to_(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y_es _ _ _ _ _ _ MASP caleulafed_at 2340psi, 3500_psi_planned BOP test ressure.. _ _
p
~.,. .
r~
~ 31 Choke_manifofd compliegwlAPl RP-53 (May 84)_ _
-
- Yes .
-
32 Workwilloccurwithoutoperationshutdown________ ___ _________ _________ Yes.__. _ ._ _____._,_
33 Is presence_of H2S gas Rrqbable_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . _ . . H2S is known at Prudhoe.. Mud should_preclude on rig, Rig has senso[s and alarms, _ . . _ . _ _ - - . _ . . _ . .
34 Mechanical_condition of wells within AOR yenfied (For_se[vice wel_I onik)_ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Geology ' 35 Permik can be issued wlo hydrogen_ sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ . _ , _ _ _ _ _ _
36 Data_presentedonpoleniialoyerpress~rezones--_- ---.-----_- _-.------ NA------ _---_--------------_----, -------_ _ ---------_----_-_-.-
Appr Date 37 Seismic,analysis_ofshallqwgas_zones_ _____________ ________ __ _.___, NA_.____ _________..
ACS 5!8l2007
38
Seabed condition suryey (if off_-shore} _ _ _ _ _ . _ _ _ _
NA _.
39 Contact name/phone for weekly_progress reports [exploratory only] _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ MARY ENDAGOTT - 5644388
Geologic Engineering Public
Commissioner: Date: Commissioner: Date ' ner
S-iv~~
~ Date
~S '
~ l~l ~i~~
' `~ ~,.~~ a ~
~
~
~
Well History File
APPE~IDIX
Information of detailed nature that is not
C~
particula~iy geRnane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
sim.pl'rfy finding information, informalion of this
nature is accumulaied at the end of the file under APPENDIX.
No special effort has been made to chronologicaliy
organiz.e this category of information.
~
**** REEL HEADER ****
MWD
08/03/04
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/06/28
1439286
O1
3" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
~Version Information
~J
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. N0: One line per frame
~Well Info rmation Block
#MNEM.UNIT Data Type Information
#--- - ------------- -------------------------------
STRT.FT 11050.0000: Starting Depth
STOP.FT 12820.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: E-11BL1-PB1
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 20' 32.551"N 148 deg 39' 54.999"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 028 Jun 2007
API . API NUMBER: 500292047571
~Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 6 .
TOWN.N T11N .
RANG. R14E .
PDAT. MSL .
EPD .F 0 .
LMF . RF .
FAPD.F 58 .
DMF . RF .
EKB .F 0 .
EDF .F 58
EGL .F 0 .
CASE.F N/A .
OS1 . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
~O'~-O Co ~ ~l ~o D LLC~
.
~
(2) Al1 depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (SSTVD) are SubSea corrected.
(4) Al1 Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and
Ultra Slim Resistivity Sub.
(7) Data presented here is final and has been depth adjusted to PDCL
(Primary
Depth Control Log) from Sperry Sun dated 28 Oct 2007.
(8) Tied to PBU E-11B at 11101.36 feet MD (8964.73 ft. TVDSS)
(9) The sidetrack was drilled from PBU E-11B through a milled window in
4 1/2 inch liner.
Top of window 11112 ft.MD (8974 ft.TVDSS)
Bottom of window 11119 ft.MD (8981 ft.TVDSS)
(10) This section was abandoned and sidetracked due to shale instability
at 12450 feet MD.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Penetration, feet/hour
RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT)
(400kHz),Ohm-m
RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT)
(2MHz),Ohm-m
RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(400kHz),Ohm-m
RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(2MHz),Ohm-m
TVD -> Subsea True Vertical Depth
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
11062, 11055.8, ! -6.21875
11063.9, 11057.3, ! -6.63281
11066.2, 11059.7, ! -6.42578
11067.8, 11061.4, ! -6.42578
11071.6, 11066, ! -5.59668
11074.7, 11068.5, ! -6.21875
11077.4, 11070.3, ! -7.04785
11080.1, 11072.6, ! -7.46191
11082.3, 11074.3, ! -8.08398
11084, 11077.4, ! -6.63379
11086.5, 11080.5, ! -6.01172
11091.5, 11085.9, ! -5.59668
11092.7, 11087.7, ! -4.97559
11094.4, 11089.6, ! -4.76758
11097.3, 11094, ! -3.31641
11098.9, 21096, ! -2.90234
11100, 11096.4, ! -3.52344
11102, 11097.9, ! -4.14551
11103.5, 11099.1, ! -4.35352
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 92 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
~
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN e 11b11 pb1 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN E-lIBLl-PB1
APIN
FN Prudhoe Bay Unit
COUN North Slope Borough
STAT Alaska
*** LIS COMMENT RECORD ***
•
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
of Sperry Sun dated 28 Oct 2007.
*** INFORMATION TABLE: CIFO
MNEM
----- CHAN DIMT
---------
-----
-- CNAM ODEP
--
GR -
-
GR -----------
GRAX ----------------
0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
~
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 99
Tape File Start Depth = 11050.000000
Tape File End Depth = 12819.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 112 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN e llbll pbl.xtf
LCC 150
CN BP Exploration (Alaska)
WN E-11BL1-PB1
APIN
FN Prudhoe Bay Unit
COUN North Slope Boro
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!~~~~~~!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM
-------- CHAN DIMT
-----------
- CNAM
- ODEP
GRAX ---
GRAX ----------------
GRAX ------------
0.0
ROPS ROPS ROPA 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is do wn (value= 255)
Optical Log Depth Scale Units: Feet
~
~
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-ty pe is: 1
FRAME SPACE = 0. 250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 AAPI 4 4
2 ROPS MWD 68 1 F/HR 4 4
3 RACL MWD 68 1 OHMM 4 4
4 RACH MWD 68 1 OHMM 4 4
5 RPCL MWD 68 1 OHMM 4 4
6 RPCH MWD 68 1 OHMM 4 4
24
Total Data Records: 196
Tape File Start Depth = 11056.000000
Tape File End Depth = 12819.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 209 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/06/28
1439286
O1
**** REEL TRAILER ****
MWD
O8/03/04
BHI
Ol
~
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
•
~
Maximum record length: 132 bytes
!
~
Tape Subfile 1 is type: LIS
• i
Tape Subfile 2 is type: LIS
DEPTH GR ROP RAD RAS
RPD RPS
11050.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.250Q -999.2500
11050.5000 64.6000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11100.0000 6~.0543 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11200.0000 247.2527 15.7359 2179.3999 6064.5400
55.4167 46.3682
11300.0000 74.3285 32.9000 2179.3999 6064.5400
341.2343 160.4031
11400.0000 171.2016 68.6406 2179.3999 88.4435
35.9290 31.3916
11500.0000 77.2207 83.9980 10.5452 8.5072
7.7308 7.1724
11600.0000 81.1019 94.8203 25.0299 17.9907
15.3090 14.3909
11700.0000 79.0012 97.2430 19.6676 14.2380
12.4531 11.3200
11800.0000 90.5023 91.9988 20.6421 16.3180
14.2907 13.5540
11900.0000 90.7012 69.4031 20.7268 15.6050
13.7290 12.7040
12000.0000 89.6602 67.7609 21.8928 17.3698
15.1483 14.3250
12100.0000 84.2395 103.0020 19.5980 14.7994
12.8185 11.8750
12200.0000 97.1582 110.4379 14.3405 11.0909
9.9084 9.3642
12300.0000 89.6617 108.6816 11.5363 9.1234
8.2810 7.6617
12400.0000 145.9238 117.5391 10.2187 8.0930
7.0030 6.1710
12500.0000 162.7043 89.3609 17.1636 16.3602
17.3343 21.6369
12600.0000 163.7180 39.1590 20.9219 18.8819
17.6415 19.0360
12700.0000 255.8648 69.6395 13.7778 9.1630
8.8149 8.2951
12800.0000 -999.2500 90.7797 -999.2500 -999.2500
-999.2500 -999.2500
12819.0000 -999.2500 -999.2500 -999.2500 -999.2500
~
-999.2500 -999.2500
Tape File Start Depth = 11050.000000
Tape File End Depth = 12819.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
L~
! •
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS RACL RACH
RPCL RPCH
11056.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11056.2500 64.6000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11100.0000 99.6000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11200.0000 247.2000 37.0000 2179.3999 116.5700
23.3950 16.6310
11300.0000 94.6000 31.8000 2179.3999 6064.5400
39270.0000 302.1590
11400.0000 152.3000 67.8000 2179.3999 84.4840
37.1930 32.8070
11500.0000 79.1000 77.9000 10.8760 8.9780
7.7950 6.9380
11600.0000 81.8000 85.1000 24.9150 17.6820
15.0500 14.2000
11700.0000 84.8000 89.0000 20.2690 14.6050
12.5920 11.3200
11800.0000 91.7000 83.4000 20.7830 16.2800
14.1640 13.2890
11900.0000 93.7000 86.4000 20.5070 15.6640
13.7290 12.8410
12000.0000 86.0000 92.8000 21.2130 17.1570
14.8610 13.8550
12100.0000 85.2000 99.3000 19.8070 14.8930
12.9240 11.9980
12200.0000 107.3000 118.3000 14.6370 11.2260
10.0680 9.3730
12300.0000 81.1000 107.2000 11.6530 9.1390
8.3620 7.7430
12400.0000 101.6000 119.7000 9.8130 7.7830
7.0030 6.3140
12500.0000 168.5000 61.1000 17.9990 16.0110
15.1150 16.3660
12600.0000 144.2000 32.5000 20.3680 18.2030
18.5730 21.2870
12700.0000 111.8000 525.7000 13.0470 8.3190
8.0210 7.5570
12800.0000 -999.2500 89.3000 -999.2500 -999.2500
-999.2500 -999.2500
12819.0000 -999.2500 -999.2500 -999.2500 -999.2500
~
-999.2500 -999.2500
Tape File Start Depth = 11056.000000
Tape File End Depth = 12819.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
~
~
•
Tape Subfile 4 is type: LIS
~ ~
**** REEL HEADER ****
MWD
08/03/03
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/06/05
1439286
01
3" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
~Version Information
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
~Well Information Block
#MNEM.UNIT Data Type Information
#------- ------- -------------------------------
STRT.FT 11055.0000: Starting Depth
STOP.FT 13525.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: E-11BL1
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 20' 32.551"N 148 deg 39' S4.999"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 05 Jun 2007
API . API NUMBER: 500292047560
~Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 6 .
TOWN.N T11N .
RANG. R14E .
PDAT. MSL .
EPD .F 0 .
LMF . RF .
FAPD.F 58 .
DMF . RF .
EKB .F 0 .
EDF .F 58
EGL .F 0 .
CASE.F N/A .
OS1 . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
~~~-~~f ~ ~(O~~I
~~
~
(2) All depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (SSTVD) are SubSea corrected.
(4) All Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and
Ultra Slim Resistivity Sub.
(7) Data presented here is final and has been depth adjusted to PDCL
(Primary
Depth Control Log) from Sperry Sun dated 28 Oct 2007.
(8) Tied to PBU E-11B at 11101.36 feet MD (8964.73 ft. TVDSS)
(9) The sidetrack was drilled from PBU E-11B through a milled window in
4 1/2 inch liner.
Top of window 11112 ft.MD (8974 ft.TVDSS)
Bottom of window 11119 ft.MD (8981 ft.TVDSS)
(10) Sidetrack off of E-11BL1-PB2 at 11515 feet MD (9007 feet TVDSS).
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Penetration, feet/hour
RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT)
(400kHz),Ohm-m
RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT)
(2MHz),Ohm-m
RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(400kHz),Ohm-m
RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(2MHz),Ohm-m
TVD -> Subsea True Vertical Depth
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
11062, 11055.8, ! -6.21875
11063.9, 11057.3, ! -6.63281
11066.2, 11059.7, ! -6.42578
11067.8, 11061.4, ! -6.42578
11071.6, 11066, ! -5.59668
11074.7, 11068.5, ! -6.21875
11077.4, 11070.3, ! -7.04785
11080.1, 11072.6, ! -7.46191
11082.3, 11074.3, ! -8.08398
11084, 11077.4, ! -6.63379
11086.5, 11080.5, ! -6.01172
11091.5, 11085.9, ! -5.59668
11092.7, 11087.7, ! -4.97559
11094.4, 11089.6, ! -4.76758
11097.3, 11094, ! -3.31641
11098.9, 11096, ! -2.90234
11100, 11096.9, ! -3.52344
11102, 11097.9, ! -4.14551
11103.5, 11099.1, ! -4.35352
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 92 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
MWD .001
~ ~
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN e 11_bll_5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN E-11BL1
APIN
FN Prudhoe Bay Unit
COUN North Slope Borough
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
of Sperry Sun dated 28 Oct 2007.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
GR GR GRAX 0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
~ ~
24
Total Data Records: 138
Tape File Start Depth = 11055.000000
Tape File End Depth = 13525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 151 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN e 11 bll.xtf
LCC 150
CN BP Exploration (Alaska)
WN E-11BL1
APIN
FN Prudhoe Bay Unit
COUN North Slope Boro
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!~~~~~~~~~!~!~! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
GRAX GRAX GRAX 0.0
ROPS ROPS ROPA 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
! ~
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Su b-ty pe is: 1
FRAME SPACE = 0. 250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 AAPI 4 4
2 ROPS MWD 68 1 F/HR 4 4
3 RACL MWD 68 1 OHMM 4 4
4 RACH MWD 68 1 OHMM 4 4
5 RPCL MWD 68 1 OHMM 4 4
6 RPCH MWD 68 1 OHMM 4 4
24
Total Data Records: 275
Tape File Start Depth = 11055.750000
Tape File End Depth = 13525.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 288 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/06/05
1439286
O1
**** REEL TRAILER ****
MWD
08/03/03
BHI
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
~
~
Tape Subfile 1 is type: LIS
~ ~
Tape Subfile 2 is type: LIS
DEPTH GR ROP RAD RAS
RPD RPS
11055.0000 64.0107 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11055.5000 64.6000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11100.0000 67.0543 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11200.0000 247.2527 15.7359 2179.3999 6064.5400
55.4167 46.3682
11300.0000 74.3285 32.9000 2179.3999 6064.5400
341.2343 160.4031
11400.0000 171.2016 68.6406 2179.3999 88.4435
35.9290 31.3916
11500.0000 77.2207 83.9980 10.5452 8.5072
7.7308 7.1724
11600.0000 86.7840 87.9594 -999.2500 -999.2500
-999.2500 -999.2500
11700.0000 91.7805 91.4586 -999.2500 -999.2500
-999.2500 -999.2500
11800.0000 97.2375 74.8262 -999.2500 -999.2500
-999.2500 -999.2500
11900.0000 93.2207 229.0894 -999.2500 -999.2500
-999.2500 -999.2500
12000.0000 81.2195 95.7613 -999.2500 -999.2500
-999.2500 -999.2500
12100.0000 84.5609 87.2418 -999.2500 -999.2500
-999.2500 -999.2500
12200.0000 90.6223 115.4602 -999.2500 -999.2500
-999.2500 -999.2500
12300.0000 87.8805 132.6211 -999.2500 -999.2500
-999.2500 -999.2500
12400.0000 87.2586 131.4410 -999.2500 -999.2500
-999.2500 -999.2500
12500.0000 81.8027 145.7433 -999.2500 -999.2500
-999.2500 -999.2500
12600.0000 94.9191 134.0574 -999.2500 -999.2500
-999.2500 -999.2500
12700.0000 93.2980 116.6801 -999.2500 -999.2500
-999.2500 -999.2500
12800.0000 89.0207 111.3988 -999.2500 -999.2500
-999.2500 -999.2500
12900.0000 97.2785 101.2430 -999.2500 -999.2500
~
-999.2500 -999.2500
13000.0000 78.9039 121.818i
-999.2500 -999.2500
13100.0000 75.1012 142.541C
-999.2500 -999.2500
13200.0000 80.1219 115.900C
-999.2500 -999.2500
13300.0000 85.8605 125.542E
-999.2500 -999.2500
13400.0000 79.7219 123.080~
-999.2500 -999.2500
13500.0000 80.5184 133.4609
-999.2500 -999.2500
13525.0000 -999.2500 123.3016
-999.2500 -999.2500
Tape File Start Depth = 11055.000000
Tape Fil,e End Depth = 13525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
~
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
~ ~
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS RACL RACH
RPCL RPCH
11055.7500 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11056.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11100.0000 99.6000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
11200.0000 247.2000 37.0000 2179.3999 116.5700
23.3950 16.6310
11300.0000 94.6000 31.8000 2179.3999 6064.5400
39270.0000 302.1590
11400.0000 152.3000 67.8000 2179.3999 84.4840
37.1930 32.8070
11500.0000 79.1000 77.9000 10.8760 8.9780
7.7950 6.9380
11600.0000 87.4000 88.6000 -999.2500 -999.2500
-999.2500 -999.2500
11700.0000 96.4000 86.2000 -999.2500 -999.2500
-999.2500 -999.2500
11800.0000 91.4000 80.5000 -999.2500 -999.2500
-999.2500 -999.2500
11900.0000 97.7000 86.0000 -999.2500 -999.2500
-999.2500 -999.2500
12000.0000 83.1000 96.2000 -999.2500 -999.2500
-999.2500 -999.2500
12100.0000 90.0000 85.0000 -999.2500 -999.2500
-999.2500 -999.2500
12200.0000 90.4000 89.8000 -999.2500 -999.2500
-999.2500 -999.2500
12300.0000 88.1000 131.5000 -999.2500 -999.2500
-999.2500 -999.2500
12400.0000 88.5000 132.1000 -999.2500 -999.2500
-999.2500 -999.2500
12500.0000 84.4000 107.9000 -999.2500 -999.2500
-999.2500 -999.2500
12600.0000 97.7000 130.7000 -999.2500 -999.2500
-999.2500 -999.2500
12700.0000 100.9000 111.3000 -999.2500 -999.2500
-999.2500 -999.2500
12800.0000 84.2000 1818.0000 -999.2500 -999.2500
-999.2500 -999.2500
12900.0000 97.7000 88.1000 -999.2500 -999.2500
~
-999.2500 -999.2500
13000.0000 78.8000 123.800C
-999.2500 -999.2500
13100.0000 78.3000 147.200C
-999.2500 -999.2500
13200.0000 80.4000 119.200C
-999.2500 -999.2500
13300.0000 80.0000 128.3000
-999.2500 -999.2500
13400.0000 79.2000 120.800C
-999.2500 -999.2500
13500.0000 81.0000 135.7000
-999.2500 -999.2500
13525.0000 76.0000 117.2000
-999.2500 -999.2500
Tape File Start Depth = 11055.750000
Tape File End Depth = 13525.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
~
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
~ ~
Tape Subfile 4 is type: LIS
~
**** REEL HEADER ****
MWD
08/03/05
BHI
O1
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/06/30
1439286
O1
3" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
~
-Version Information
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
~Well Information Block
#MNEM.UNIT Data Type Information
#--------- ------------- -------------------------------
STRT,FT 11056.0000: Starting Depth
STOP,FT 12637.0000: Ending Depth
STEP,FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP, COMPANY: BP Exploration (Alaska), Inc.
WELL, WELL: E-11BL1-PB2
FLD , FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 20' 32.551"N 148 deg 39' S4.999"W
CNTY, COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 30 Jun 2007
API . API NUMBER: 500292047572
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 6 .
TOWN.N T11N .
RANG. R14E .
PDAT. MSL .
EPD .F 0 .
LMF . DF .
FAPD.F 58 .
DMF . DF .
EKB .F 0 .
EDF .F 58•
EGL .F 0 .
CASE.F N/A .
OS1 . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
~o°~ ~-C~Co r ~l~o~ ~~
~ ~
(2) All depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (SSTVD) are SubSea corrected.
(4) Al1 Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and
Ultra Slim Resistivity Sub.
(7) Data presented here is final and has been depth adjusted to PDCL
(Primary
Depth Control Log) from Sperry Sun dated 28 Oct 2007. All data
above the Kick Off Point
(KOP) was depth matched to the PDCL carrying the final shift from
the KOP (11102 feet MD)
to TD.
(S) Tied to PBU E-11B at 11101.36 feet MD (8964.73 ft. TVDSS)
(9) The sidetrack was drilled from PBU E-11B through a milled window in
4 1/2 inch liner.
Top of window 11112 ft.MD (8974 ft.TVDSS)
Bottom of window 11119 ft.MD (8981 ft.TVDSS)
(10) Sidetrack off of E-11BL1-PB1 at 12170 feet MD (8985.91 feet TVDSS).
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Penetration, feet/hour
RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT)
(400kHz),Ohm-m
RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT)
(2MHz),Ohm-m
RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(400kHz),Ohm-m
RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD)
(2MHz),Ohm-m
TVD -> Subsea True Vertical Depth
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
11062, 11055.8, ! -6.21875
11063.9, 11057.3, ! -6.63281
11066.2, 11059.7, ! -6.42578
11067.8, 11061.4, ! -6.42578
11071.6, 11066, ! -5.59668
11074.7, 11068.5, ! -6.21875
11077.4, 11070.3, ! -7.04785
11080.1, 11072.6, ! -7.46191
11082.3, 11074.3, ! -8.08398
11084, 11077.4, ! -6.63379
11086.5, 11080.5, ! -6.01172
11091.5, 11085.9, ! -5.59668
11092.7, 11087.7, ! -4.97559
11094.4, 11089.6, ! -4.76758
11097.3, 11094, ! -3.31641
11098.9, 11096, ! -2.90234
11100, 11096.4, ! -3.52344
11102, 11097.9, ! -4.14551
11103.5, 11099.1, ! -4.35352
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 94 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
~
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN E 11BL1_PB2_5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN E-11BL1-PB2
APIN
FN Prudhoe Bay Unit
COUN North Slope Borough
STAT Alaska
*** LIS COMMENT RECORD ***
~
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
of Sperry Sun dated 28 Oct 2007.
*** INFORMATION TABLE: CIFO
MNEM
----- Cf~N DIMT
--- CNAM ODEP
GR ---------------
GR ------------
GRAX -----------------
0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RA5 RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: o
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
~
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 88
Tape File Start Depth = 11056.000000
Tape File End Depth = 12637.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 101 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN E 11BL1_PB2.xtf
LCC 150
CN BP Exploration (Alaska)
WN E-11BL1-PB2
APIN
FN Prudhoe Bay Unit
COUN North Slope Boro
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM
----- CHAN DIMT
----------------- CNAM ODEP
GRAX -
GRAX -----------
GRAX ------------------
0.0
ROPS ROPS ROPA 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
i
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
•
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 AAPI
2 ROPS MWD 68 1 F/HR
3 RACL MWD 68 1 OHMM
4 RACH MWD 68 1 OHMM
5 RPCL MWD 68 1 OHMM
6 RPCH MWD 68 1 OHMM
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Total Data Records: 176
Tape File Start Depth = 11056.000000
Tape File End Depth = 12637.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
Minimum record length:
Maximum record length:
**** TAPE TRAILER ****
MWD
07/06/30
1439286
O1
**** REEL TRAILER ****
MWD
08/03/O5
189 records...
54 bytes
4124 bytes
~
BHI
O1
•
Tape Subfile: 4 2 records...
•
Minimum record length: 132 bytes
Maximum record length: 132 bytes
~
~
Tape Subfile 1 is type: LIS
~
Tape Subfile 2 is type: LIS
DEPTH GR ROP
RPD RPS
11056.0000 64.2449 -999.2500
-999.2500 -999.2500
11056.5000 62.4290 -999.2500
-999.2500 -999.2500
11100.0000 67.0543 -999.2500
-999.2500 -999.2500
11200.0000 247.2527 15.7359
55.4167 46.3682
11300.0000 74.3285 32.9000
341.2343 160.4031
11400.0000 171.2016 68.6406
35.9290 31.3916
11500.0000 77.2207 83.9980
7.7308 7.1724
11600.0000 81.1019 94.8203
15.3090 14.3909
11700.0000 79.0012 97.2430
12.4531 11.3200
11800.0000 90.5023 91.9988
14.2907 13.5540
11900.0000 90.7012 69.4031
13.7290 12.7040
12000.0000 89.6602 67.7609
15.1483 14.3250
12100.0000 84.2395 103.0020
12.8185 11.8750
12200.0000 93.5625 38.5008
10.6908 9.9660
12300.0000 86.6230 76.4000
14.3140 13.5480
12400.0000 107.9422 145.9062
14.2652 14.1590
12500.0000 142.3566 113.9414
12.6881 11.8597
12600.0000 -999.2500 123.6574
-999.2500 -999.2500
12637.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 11056.000000
Tape File End Depth = 12637.000000
Tape File Level Spacing = 0.500000
•
RAD
-999.2500
-999.2500
-999.2500
2179.3999
2179.3999
2179.3999
10.5452
25.0299
19.6676
20.6421
20.7268
21.8928
19.5980
15.9194
19.9265
18.1660
18.1724
-999.2500
-999.2500
RAS
-999.2500
-999.2500
-999.2500
6064.5400
6064.5400
88.4435
8.5072
17.9907
14.2380
16.3180
15.6050
17.3698
14.7994
11.8790
16.5040
15.5712
14.2933
-999.2500
-999.2500
~ ~
Tape File Depth Units = feet
•
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
RPCL RPCH
11056.0000 -999.2500 -999.2500
-999.2500 -999.2500
11056.2500 64.6000 -999.2500
-999.2500 -999.2500
11100.0000 99.6000 -999.2500
-999.2500 -999.2500
11200.0000 247.2000 37.0000
23.3950 16.6310
11300.0000 94.6000 31.8000
39270.0000 302.1590
11400.0000 152.3000 67.8000
37.1930 32.8070
11500.0000 79.1000 77.9000
7.7950 6.9380
11600.0000 81.8000 85.1000
15.0500 14.2000
11700.0000 84.8000 89.0000
12.5920 11.3200
11800.0000 91.7000 83.4000
14.1640 13.2890
11900.0000 93.7000 86.4000
13.7290 12.8410
12000.0000 86.0000 92.8000
14.8610 13.8550
12100.0000 85.2000 99.3000
12.9240 11.9980
12200.0000 88.6000 62.1000
10.5620 9.7770
12300.0000 86.8000 77.6000
14.0340 13.2570
12400.0000 106.0000 146.9000
14.1730 13.9630
12500.0000 126.2000 108.9000
13.1190 12.4350
12600.0000 -999.2500 150.3000
9.2360 8.3490
12637.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 11056.000000
Tape File End Depth = 12637.000000
Tape File Level Spacing = 0.250000
.
RACL
-999.2500
-999.2500
-999.2500
2179.3999
2179.3999
2179.3999
10.8760
24.9150
20.2690
20.7830
20.5070
21.2130
19.8070
15.7870
19.6940
18.5000
18.5230
13.9450
-999.2500
RACH
-999.2500
-999.2500
-999.2500
116.5700
6064.5400
84.4840
8.9780
17.6820
14.6050
16.2800
15.6640
17.1570
14.8930
11.6500
15.9700
15.5320
14.7160
10.7820
-999.2500
~ •
Tape File Depth Units = feet
~ ~
Tape Subfile 4 is type: LIS