Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout207-078 • •
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Wednesday, May 16, 2018 9:08 AM
To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS GC1 Field O&M IL;
AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS
Well Pad AB;AK, OPS Well Pad CX;Ak, Ops West Area IL;AK, RES GPB East Wells Opt
Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Boman,Wade;Von Tish,
Douglas B; Regg,James B (DOA)
Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects
Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS
App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert,
Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau;
O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,
Aras J;Wallace, Chris D (DOA)
Subject: OPERABLE: Producer X-30A(PTD#2070780)Well barriers restored, MIT-T, CMIT-TxIA
passed
All,
Producer X-30A(PTD#2070780)was made under evaluation on 4/25/18 for having sustained inner annulus casing
pressure above NOL and failing a TIFL. On 5/14/18 slickline completed a gas lift change out and performed a passing
MIT-T to 2431psi and CMIT-TxIA to 2357psi. The passing pressure test confirms that well barriers have successfully been
restored. At this time the well is reclassified as Operable.
Please respond with any questions,
Joshua Stephens
Well Integrity Engineer
Office: 907-659-8110 SCANNED
Cell: 907-341-9068
WO
—...r.S.s..4010m
From: AK, GWO ' ; ntegrity Engineer
Sent: Wednesday, April , a 8 1:05 PM
To: AK, OPS EOC Specialists; AK, 0' . _ Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS
Prod Controllers; AK, OPS Well Pad AB; AK, 0' - Pad CX; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr;
AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; ;• -u Wade; Von Tish, Douglas B; 'Regg, James B (DOA)
(jim.regg@alaska.gov)'
Cc: AK, GWO Completions Well Integrity; AK, GWO DHD Well Integrity; , WO Projects Well Integrity; AK, GWO SUPT
Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops • - • Rep; AKIMS App User; Cismoski,
Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janowski, .- ie; Montgomery, Travis J;
Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tem•; Joshua; Worthington,
1
• •
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Wednesday,April 25, 2018 1:05 PM
To: AK, OPS EOC Specialists;AK, OPS GC1 Field O&M IL;AK, OPS GC1 Wellpad Lead;AK,
OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad AB;AK, OPS Well Pad
CX;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells
Opt Engr;AKOp5ProdEOCTL; Boman,Wade;Von Tish, Douglas B; Regg,James B (DOA)
Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects
Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;
AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan;
Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,
Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A;Sternicki,
Oliver R;Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA)
Subject: UNDER EVALUATION: Producer X-30A (PTD#2070780) sustained IA pressure over NOL
Attachments: X-30A.pdf
All,
Producer X-30A(PTD#2070780)was called in with IA pressure above NOL on 04/22/18.The pressures were T/I/O:
2050/2050/0 psi.On 04/22/18 DHD performed a failing cold TIFL.The well was put on production and on 04/25/18 DHD
performed a warm TIFL that also failed.The failed TIFLs indicate a failure in one or more well barriers.The well is now
classified as UNDER EVALUATION and is on the 28 day clock for diagnostics and repair.
Plan Forward:
1. Slickline: Change out screened orifice
2. DHD:TIFL
3. Slickline (Pending): Set DGLVs and/or plug
4. Fullbore (Pending): Perform MIT5
Please respond with any questions.
SCAN ...
Andrew Ogg
Well Integrity Engineer
BP Global Wells Organization-Alaska
Office:907-659-8110
1
C
v
O N
° .a
v" (i '
), - COO O >
O u Qx co L
S
is W v
v
Qpm YO
� O
Q U VI ;
Y C-
773
W QrY O' N _ O O O
N 0Y a 0_ Q
Q J { r T ro O L m
d O
HF O o o y `^ teCC y (15
Z a N N C ro Q1 Q N
Z Q c Oa cc u o >
F.`
1Ii a ...1
W W W W W cc_c C O O
W
H LL LL LL LL LL LL v a) E - v)
Q J J J J J J Q O C N
LO F- Q Q Q Q Q Q O
O o z Z z Z z z u r0 v 0 u
pp y� LL LL LL LL LL LL ;F
U v
C�+ ,-0 .„ y u
Fi ate. v
L.
_ O
01 d Q) O O
0
N C
U rt! C O C - c
T-, Q1 O1 w CV
a' N c
_ O v
b 2 U K Q a t U >
t0 vuw
) W
'�i LL
W
?M L. O O JCle J O J J
Q E O 2 z N
0 Do U 5 w N
co G '^0° `- >
J a)
V
W O ? r Y1 a)*yy
col 4KC 0
,WW Wtti 40 wo >, iaT �
a o o `0 0 0
� M ,, E E E E E
z a M N 2 222 2 \
•
R W a a a a a
2 m m m m m N
Q W W W W W Q
Z 0 0 0 0 0 W
-, 0 en0 tn in 0 I a)
w > > > > > m O
C O. CL CL C
O. a a a a
c
iNia XVI
W ..- O in N N O
c ,� D e} M in N O O 2 CO
C O O
> O O O p O O O O
,f.: co Ea$ , • > > x
� ooco � a) v
ns����� a o
ba
LIJ
0 O O C0 L
O O O O O O
O
trit N O N %- 6 a) T 4-. Q
m N CO U) h C) N Z
N N 0 0 0 0 M ,w >
N NNNNNN m
z O O O O O O E C
NNNNNN C 0
Q1
0 0 0 0 0 0
f4 C
U) i() N 1in
n N i 4.. m
= COCO c c Ln to ..Y-
a)
. 'O w
Com. Euj z E u CCo E o
o m
CD W S CwC N
.a Q Q N M
I
el v
cc
0 Vf J
aQ N J x U O J z a s v
.�a w cn 0
f- n. a rc, m
r r- 0 0
0rw N C
GJ
c;:i
N :1 V
u JD
m a,.) Y 'U >
^ �
N O Xrov
o �
3o _
i .. -- Z Op w H >-
7 m 0.
O • a
!IP U.1 G44
o
, 0 U i(7-_)
p @co
ca
CL
<
Q Q LLI CD w bin
ca) ENO E .Y m
�AQ < OQ
Ncn
Z
4 ctF. UUoNZ
O�W�
Itif UJ UN L11
i_<---_ Y
Q
p D < d
u y y
OOo ^
p N <
CU 0•
0 0 p p
w} .0 U yJVln N
• a G o }+v
.4.-7.
c o CL) L. N
Ou EO
dv u
_c D
O a "
(13 ..c ..c
W
bz c o O O
.-.1 F- LL LL LL LL LL ., Q1 E N
CI) E a .Q Q Q Q Q O- -0 O O a
Z CZ Z Z Z Z Z _ a N
Opi LL. LL LL LL LL u CO a1 c) u
• >m ;.-.,u
E 0- Ya) o O
O Z E
V H 0 c O _a c
n > > c -
co K�‹y uVi j a)a) < a) _c uO >
7M ,E w0 J O ce JCC
g m p F-
Cm r: J U a J J 2 \� Y
O O .4 p co N.
/mow v w
W V co y W \
W G3
W oh CO
o U > . o: y 68J
v 03 co I
N 003 c- , 0 0 0 _, J �!
w
41-.0"11
p
OP
UJ
2m• mmmm I a)
z o 0 a)0 0 E
p L .c .c .c .c 3
a a a a a L
W 3 3 3 3 7 4 E U
1L n. a a d 0. = '^
a.+
C o >
n
UJ N e- 111 a0 10 X ccO
CI a s ao N 1n u
0 0 0 0 0 0 f6
Lu 0 0 0 0 0
U 12 CO
> > x co0 v aa)
cc
1L U U U 0 0 -0
w c
K ra
O O N O O U
lD 0 0 0 0
1n
N M O v N 6
10 In � 0) M c
n 10 In 0) 10 00 0
N "7- O N < 0 M 'y1 O
044.�� N N N N N
L.,
: C)0 ) o) 0)0 ) O Q
QQO)) ' N N N 01 N
.... O 0 0 0 O cu `^
O O O O O '-
In Ln In in In 3 •-
CID SCC CO c 0-44 0 1
gELu ro cu
u
CID w Ne1 e ` s• A Q O m N co a. f6 aI 3
1 = a J U . N ti r r0 i H
_ aQ5N J x } oo E za.
.L: N _ w N m
gj d m
F- a a Q
~ ~
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~'~ - Q~~ Well History File Identifier
Organizing (done) ^ Two-sided III II~III IIIII II (II ^ Rescan Needed
RES AN DIG AL DATA
Color Items: Diskettes, No. ~
^ Greyscale Items: ^ Other, No/Type:
^ Poor Quality Originals:
^ Other:
NOTES:
BY: ( Maria Date:
Project Proofing
BY: ~ Maria~ Date: ~ ~~~
~ x 30
Scanning Preparation ~ _
BY: _ Maria Date: ~, ( I/
Production Scanning
III II'IIIIIIII IIIII
/s/
/
D + c~•~v = TOTAL PAGES i I~
(Count does not include cover sheet)
~ ~l' /s/
Stage 1 Page Count from Scanned File: (count does inciude cover sneet)
Page Count Matches Number in Scanning Preparation: ~ YES NO
BY: Maria Date: ~! (~ /s/ ~ Y I,
1 ~ 1'
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: ~S~
Scanning is complete at this point unless rescanning is required. II I I) II II ( II II I I II
ReScanned (I I II I) II I I III I I(II
BY: Maria Date: ~S~
Comments about this file: Quality Checked (II (IIIII II) IIII III
OVERSIZED (Scannable)
^ Maps:
~ Other Items Scannable by
a ~arge Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
^ Other::
D l D~7' ~S~
~
~
10/6l2005 Well History File Cover Page.doc
STATE OF ALASKA
+ ALASKA OAND GAS CONSERVATION COMMISSIA
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑
Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑
Change Approved Program ❑ Operat. Shutdown ❑ Perforate la Re -enter Suspended Well ❑
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development El Exploratory ❑ '' 207 -0780
3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number:
Anchorage, AK 99519 -6612 ed 50- 029 - 22550 -01 -00
8. Property Designation (Lease Number) : , 9. Well Name and Number:
ADLO- 047475 PBU X -30A
10. Field /Pool(s): y
PRUDHOE BAY FIELD / PRUDHOE OIL POOL
11. Present Well Condition Summary:
Total Depth measured 14320 feet Plugs (measured) None feet
true vertical 9053.37 feet Junk (measured) None feet
Effective Depth measured 14274 feet Packer (measured) 11307 11438 feet
true vertical 9053.67 feet (true vertical) 8761 8828 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80' 20" 91.5# H-40 31 - 111 31 - 111 1490 470
Surface 3247' 10 -3/4" 45.5# NT80 30 - 3277 30 - 3083 5210 2480
Production 11601' 7 -5/8" 29.7# L -80 27 - 11628 27 - 8924 6890 4790
Liner 1407' 5 -1/2" 17# L -80 11482 - 12889 8850 - 9043 7740 6280
Liner 52' 3 -1/2" 9.2# L -80 12506 - 12558 9026 - 9026
Liner 749' 3- 3/16" 6.2# L -80 12558 - 13307 9026 - 9039
Liner 1013' 2 -7/8" 6.16# L -80 13307 - 14320 9039 - 9053 i 13450 13890
Perforation depth: Measured depth: SEE ATTACHED - , � . !� AU ! i _ _
True Vertical depth: _ ",1, a ' _ _ _
Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13CR80 26 - 11396 26 - 8807
4 -1/2" 12.6# L -80 11396 - 11485 8807 - 8852
Packers and SSSV (type, measured and true vertical depth) 4 -1/2" BKR S -3 PKR 11307 8761
4 -1/2" BKR SABL -3 PKR 11438 8828 ,
RECEIVED
12. Stimulation or cement squeeze summary: AUG 16 2011
Intervals treated (measured): Alike- �N
Treatment descriptions including volumes used and final pressure: Oil St Gat Cow Goalmighe
Amens
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure
Prior to well operation: 165 808 2332 283
Subsequent to operation: 152 756 2425 366
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory Development 0 - Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil „ la Gas ❑ WDSPL ❑
GSTOR ❑ WINJ ❑ WAGO GINJ ❑ SUSP❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Joe Lastufka
Printed Na •e Lastu Ao Title Petrotechnical Data Technologist
Signatu - \V'0 — Phone 564 -4091 Date 8/15/2011
Form 10-404 Revised 10/2010 Vil... l Submit Original Only • �
MS AUG 17 2011 gr l ,
X -30A
207 -078
PERF ATTACHMENT
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
X -30A 10/9/07 PER 13,370. 13,660. 9,037.75 9,037.86
X -30A 10/9/07 PER 13,730. 14,280. 9,038.67 9,053.63
X -30A 7/17/11 APF 12,320. 12,350. 9,023.75 9,026.65
X -30A 7/17/11 APF 12,416. 12,446. 9,028.36 9,027.03
X -30A 7/18/11 APF 12,060. 12,090. 9,013.33 9,014.45
X -30A 7/19/11 APF 11,960. 11,990. 9,009.1 9,010.4
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG PULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
•
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
• •
X -30A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
w Lr ..
at.
7/16/2011; CT -8 1 3/4" SCOPE OF WORK: Jewelry Log /Drift, Perforate 120' with 4 x 30' 2 7/8"
'PJ Omega HMX, 6 SPF @ 60 degree phasing.
MIRU, WEEKLY BOP TEST. This included testing ESD of the unit. MU Weatherford
;MHA and 16' 3 3/8" dummy /drift. MU PDS 2 7/8" carrier w/ 3.37" nozzle. Fluid pack
;chrome tubing w/ safelube KCL. RIH. Tagged deployment sleeve @ 12507' CT wgt
;back depth. Start logging up @ 45 FPM to 11,000'. POOH. Correction -2' from PDS
data. MU 30' x 2 7/8" HSD P- Jet -HMX guns.
« «IN PROGRESS Continued on 7 -17 -11 WSR » »>
3 t
7/17/2011 CT -8 1 3/4" SCOPE OF WORK: Jewelry Log /Drift, Perforate 120' with 4runs x 30' 2
7/8" PJ Omega HMX, 6 SPF @ 60 degree phasing.
RIH w Gun #1: /30' x 2 7/8" 6 spf guns. Good indication guns fired, shot bottom set
12416'- 12446'. POOH. Lay down Gun #1. Re -PT MHA. MU /RIH w/ Gun #2: 30' X 2
7/8" 6 spf. Shoot interval 12320'- 12350'. POOH. RD spent guns, cut 125' pipe,
`chains, stripper & rehead CTC. «« Job in progress. » »> Continued on 07/18/11
WSR
7/18/2011'CT -8 1 3/4" SCOPE OF WORK: Jewelry Log /Drift, Perforate 120' with 4runs x 30' 2
17/8" PJ Omega HMX, 6 SPF @ 60 degree phasing.
'MU CTC, pull test to 20K. MU WFT BHA. PT 300/3500 psi. RIH w /PDS 2.875"
memory logging string. Tag deployment sleeve, wgt back @ 12,511' CTD, flag @
'12,100', Log up to 11,000'. POOH. Emergency Drill: Well Control /H2S. Process log
`data, good. MU /RIH w/ Gun #3: 30' x2 7/8" Tie into flag. Shoot interval 1 20An'-
12090'. POOH. RD spent guns, MU 4th set of guns, RIH.
Continued on 7 -19 -11 WSR « <Job In Progress »»
7/19/2011 CT -8 1 3/4" SCOPE OF WORK: Jewelry Log /Drift, Perforate 120' with 4runs x 30' 2
'7/8" PJ Omega HMX, 6 SPF @ 60 degree phasing.
,Cont. RIH w /4th pert gun. On depth, Good indication guns fired, shot interval 11 aV'-
11990'. POOH. FP w/38 bbl 50/50 meth. RD spent guns, ball recovered. Blow down
'reel w /N2. RD, inform pad op, Move to shop for pipe swap to 1.5 ". Ref log was SLB
Memory jewelry log Oct 8, 07'.
«« «JOB COMPLETE » »>
• •
FLUIDS PUMPED
BBLS
597 1% XS KCL
210 1% KCL
48 50/50 METH
855 TOTAL
FLUIDS PUMPED
GALS
256 N2
256 TOTAL
TREE = 4" CM/ • M • Y SAFETY • ***4-1/2" CHROME TBG &
- ACTUATOR X R = BAKER C -3 0 A NIPPLES JELL ANGLE > 70° @ 11750'
KB. ELEV = 70.01' ( '
BF. ELEV 39.00'
KOP = 1696' ' , I 2024' 144-1/2" HES X NIP, ID = 3.813" I
Max Angle = 95" @ 13185'
Datum MD = 11522' GAS LIFT MANDRELS
:Datum TVD= 8800' SS I ST] MD ] TVDI DEVI TYPE] VLV LATCH PORT DATE
5 3509 3248 45 KBG2 DOME BK 16 09/28/08
J
110 -3/4" CSG, 45.5 #, NT -80 BUTT, ID = 9.953" 1 1 3277' I �„) 4 5870 4896 46 KBG2 DOME BK 16 09/28/08
3 7775 6265 44 KBG2 DOME BK 16 09/28/08
2 9475 7501 41 KBG2 DOME BK 16 09/28/08
1 11009 8601 57 KBG2 SO BK 20 09/28/08
Minimum ID = 2.387" @ 13307' 11 I 11286' 1_I4 -1/2" HES X NIP, ID = 3.813" 1
3- 3/16" X 2 -7/8" XO
S 11307' w 7 -518" X 4 -112" BKR S -3 PKR, ID = 3.875" I
1 I 11331' I_I4 -1/2" HES X NIP, ID = 3.813" I
4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, -1 11394' 1
.0152 bpf, ID = 3.958" 1 11403' 47" X 4-1/2" UNIQUE OVERSHOT 1
14 -1/2" TUBING STUB (08/09/07) H 11396' 1 I I 11427' 144 -1/2" HES X NIP, ID = 3.813" I
4 -1/2" TBG, 12.6 #, L -80 NSCT, - 11485' 11437' 1_1 BKR KBH -22 ANCHOR SEAL ASSY, ID = ? I
.0152 bpf, ID = 3.958" 11438' 1- 17 -5/8" x 4 -1/2" BKR SABL -3 PKR, ID = 3.93"
(TOP OF 5 -1/2" LNR I-1 11490' ' • I 11462' 1_14-1/2" HES X NIP, ID = 3.813" 1
17 -5/8" CSG, 29.7 #, NT -95 NSCC, ID = 6.875" H 11628' I , I 11473' I - 1 4 -1/2" HES XN NIP MILLED TO 3.80" (08/26/07)1
PERFORATION SUMMARY 7 k 11485' 144-1/2" WLEG, ID = 3.958" I
REF LOG: GR/CCL ON 05/16/96 1 11489' H ELMD TT LOGGED 05/16/96 I
ANGLE AT TOP PERF: 87° @ 11960' I
Note: Refer to Production DB for historical perf data 11490' (- 17 -5/8" X 5-1/2" TIW LTP w / LNR HGR, ID = ? I
SIZE SPF INTERVAL Opn /Sqz DATE
3 -3/8" 6 11608 - 11628 S 10/09/07
3 -3/8" 6 11680 - 11740 S 10/09/07 12284'-12424' 1_I POSSIBLE CMT SHEATH, ID = 3.75" I
3 -3/8" 4 11940 - 12130 S 10/09/07 '
2 -7/8" 6 11960 - 11990 0 07/19/11
3 -3/8" 4 12170 - 12350 S 10/09/07 + r MILLOUT WINDOW (X -30A) 12882' - 12889' I
3 -3/8" 4 12430 - 12620 S 10/09/07 A ( .
3 -3/8" 4 12660 - 12950 S 10/09/07 A ,,- 12506' 1_13.70" DEPLOYMENT SLV, ID = 3.00" I
2" 6 13360 - 13650 0 10/09/07 ■ ►
2" 6 13720 - 14270 0 10/09/07 r ,-,....1 12516' 1-13 -112" OTIS X NIP, ID = 2.81" I
'S' ► 12558' 1_13 - 1/2" X 3- 3/16" XO, ID = 2.786" 1
I TOC I 12500' j •�• � *i
13-1/2" LNR, 9.2 #, L -80 STL, .0087 bpf, ID = 2.992" I-I 12558' • ` • 1;� , • • • • 12950' - 12995' LJ HOLE IN LNR (FSPL 05/10/09) 1
1 WHIPSTOCK- 09/19/07 (RA TAG @ 12889') 1 12880' s . _: . 4
Wee. 13307' " " 2.387" 15 -1/2" LNR, 17 #, L -80, .0232 bpf, ID = 4.892" 1-1 - 12891' 13307 3 - 3/ 16 X 2 718 XO, ID = 2.3871
13-3/16" LNR, 6.2 #, L -80 TCII, .0076 bpf, ID = 2.80" I - I 13307' 1
NIP
1 PBTD H 14274' +* + *1's
12 -7/8" LNR, 6.16 #, L -80 STL, .0058 bpf, ID = 2.441" I-I 14320' I
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNFT
05/15/95 M DO ORIGINAL HORIZ COM PL 11/04/10 KS /JMD DRLG DRAFT CORRECTIONS WELL: X -30A
10/10/07 NORDIC CTD & RWO (X -30A) 03/10/11 PJC DRLG DRAFT CORRECTIONS PERMIT No: '2070780
10/29/07 DAV/TLH GLV C/0 08/07/11 PBS/ PJC PERFS (07/19/11) API No: 50- 029 - 22550 -01 -00
10/17/08 SEW /PJC GLV C/0 (09/28/09 SEC 7, T1ON, R14E, 557' FNL & 876' FEL
04/12/09 ? /SV LNR CORRECTIONS
10/21/10 KS /JMD REDLINE EDITS BP Exploration (Alaska)
-
~..~ w
~~
~~, .
~„
~,~ ~ x2
...
~ ,~ - .. ~~
~ _.
~,~,~-
..~ ~ _
~ u a~ ,~
x 4 , ~~
~ ~ ~; ~
MICROFILMED
6/30/2010
DO NOT PLACE
ANY NEW ..MATERIAL
UNDER THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Micro6lm_Marker.doc
q IU o ~ .~11~
DATA SUBMITTAL COMPLIANCE REPORT
9/23/2009
Permit to Drili 2070780 Well Name/No. PRUDHOE BAY UNIT X-30A Operator BP EXPLORATlON (ALASYCA) INC
API No. 50-029-22550-01-00
MD 14320 ND 9053 Completion Date 10/9/2007 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Surv Yes
DATA INFORMATI~N
Types Electric or Other Logs Run: MWD DIR, GR, RES, MCNL / GR / CCL (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval ON /
y e meairrmi rvumuer Name ~ca~e rvieuia no arart
---- a~op
--- ~.n
-- rceceivea
---- ~.ommenis
-
_-
D D --
Asc --- - --__ _---
Directional Survey --
12946 14320 Open 11/21/2007 X-30A, X-30APB1, X-
30APB2 on One diskette
E 128
1 13741 O 11/21/2007 P61
D D Asc Directional Survey 6 pen
ED D Asc Directional Survey 13438 13590 Open 11/21/2007 PB2
~pt Directional Survey 12946 14320 Open 11/21/2007
~ pt Directional Survey 12861 13741 Open 11/21/2007 PB1 j
Rpt Directional Survey 13438 13590 Open 11/21/2007 P62
ED C Las 15777 Induction/Resistivity 12858 14319 Open 12/14/2007 ATR, RPM, GR, RAM,
ROP w/PDF graphics
'ED C Las 15778 Induction/Resistivity 12858 13741 Open 12/14/2007 PB1 ATR, RPM, GR, RAM, I
ROP w/PDF graphics I
ED C Las 15779 Induction/Resistivity 12858 13590 Open 12/14/2007 PB2 ATR, RPM, GR, RAM,
ROP w/PDF graphics
ED C lis 15784 Gamma Ray 11020 14185 Open 12/21/2007 LIS Veri,GR, DEP CCL
w/PDS and Tif graphics
~pt LIS Verification 12850 14275 Open 11/7/2008 LIS Veri, GR, ROP, RAD, I
RAS, RPD, RPS j
~D C Lis 17105 LIS Verification 12850 14275 Open 11/7/2008 LIS Veri, GR, ROP, RAD,
RAS, RPD, RPS
Rpt LIS Verification 12850 13742 Open 11/7/2008 P61 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
~
DATA SUBMITTAL COMPLIANCE REPORT
9/23/2009
Permit to Drill 2070780 Well Name/No. PRUDHOE BAY UNIT X-30A
Operator BP EXPLORATION (ALASFCI~ INC API No. 50-029-22550-01-00
nn i4stu i vu y~~3 ~ompietwn vate ivia~~uvi ~,ompieuon atatus i-vi~ ~,urren~ ~taws i-vi~ vi~, rv
ED C Lis 17106 LIS Verification 12850 13742 Open 11/7/2008 PB1 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
i Rpt LIS Verification 12858 13592 Open 11/7/2008 PB2 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
i
` ED C Lis 17107 LIS Verification 12858 13592 Open 11/7/2008 P62 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
qg Induction/Resistivity 25 Col 12876 14320 Open 11/7/2008 MD MPR, GR 4-Oct-2007
;dLog Induction/Resistivity 25 Col 12876 14320 Open 11/7/2008 ND MPR, GR 4-Oct-2007
~ Log Gamma Ray 25 Col 12876 14320 Open 11/7/2008 MD GR 4-Oct-2007
og See Notes 2 Col 12840 14280 Open 11/7/2008 Depth Shift Monitor Plot
og Induction/Resistivity 25 Col 12876 13741 Open 11/7/2008 PB1 MD MPR, GR 24-Sep-
2007
rLog Induction/Resistivity 25 Col 12876 13741 Open 11/7/2008 PB1 TVD MPR, GR 24-
Sep-2007
Log Gamma Ray 25 Col 12876 13741 Open 11/7/2008 PB1 MD GR 24-Sep-2007
Log See Notes 2 Col 12840 13710 Open 11/7l2008 PB1 Depth Shift Monitor
Plot
og Induction/Resistivity 25 Col 12876 13590 Open 11/7/2008 PB2 MD MPR, GR 27-Sep-
2007
og Induction/Resistivity 25 Col 12876 13590 Open 11/7/2008 PB2 ND MPR, GR 27-
Sep-2007
og Gamma Ray 25 Col 12876 13590 Open 11/7/2008 PB2 MD GR 27-Sep-2007
~og See Notes 2 Col 12840 13560 Open 11/7/2008 PB2 Depth Shift Monitor
,. Plot
~ ED C Pds 18144 Production ~b~ ~~-~ 0 14252 Case 6/11/2009 Mem PPLw/Deft, PSP,
GR, CCL, Gradio, Pres,
Temp, Spin 10-May-2009
~g Production 5 Blu 0 14252 Case 6/11/2009 Mem PPL w/Deft, PSP,
; GR, CCL, Gradio, Pres,
~
~ -
- -
- Temp, Spin 10-May-2009
~
r~
~J
DATA SUBMITTAL COMPLIANCE REPORT
9/23/2009
Permit to Drill 2070780 Well NamelNo, PRUDHOE BAY UNIT X-30A Operator BP EXPZORATlON (ALASK.qI INC
MD 14320 ND 9053 Completion Date 10/9/2007 Completion Status 1-OIL Current Status 1-OIL
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
ADDITIONAL II~ORMATION
Well Cored? Y ~
Chips Received? Y.L~Ii
Analysis .Y-~#~
Received?
Comments:
Daily History Received? ~
Formation Tops ~~r/
API No. 50-029-22550-01-00
UIC N
~
~
06/08/09
' 1
LJ
'~+-
,
~l~r~_. _Ll~~~ r~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage,AK 99503-2838
ATTN: Beth
Well Job #
Log Description
NO. 5271
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Date BL Color CD
H-35 AYTO-00018 CROSS FLOW CHECK ` 05/09/09 1 1
14-35 ANHY-00087 INJECTION PROFILE -
r 05/15/09 1 1
06-08A AV1H-00012 !SP/FBS/CFS/GRADlO/PRESS/T P 05/11/09 1 1
, A-44 AWLB-00017 SCMT OS/25/09 1 1
12-07A BOCV-00016 SBHP SURVEY OS/19/09 1 1
09-24 ANHY-00088 CROSS FLOW CHECK/IBP ~ 05/17/09 1 1
H-29A AYQ~-00027 PPROF/RST - 05l19/09 1 1
09-09 AYTU-00032 CROSS FLOW CHECK -`~ f 05/O6/09 1 1
15-456 ANHY-00010 PRODUCTION PROFILE '~-- 05/09/09 1 1
13-13A AYTU-00033 USIT -~~ N 05/08/09 1 1
M-796 AY3J-00024 PRODUCTION PROFILE 05/14/09 1 1
Z-12 ANHY-00084 INJECTION PROFILE 05/07/09 1 1
E-3fiA B1JJ-Q0018 MEM CNUSTP /
~ 05/18/09 1 1
X-30A B2WY-00005 e
MEM PROD PROFILE 05/10/09 1 1
12-23 AYKP-00021 USIT G- 05/08/09 1 1
W-34A AWJI-00031 MEM PROD PROFILE OS/19/09 1 1
Z-14B AZCM-00022 PROD PROFILE/JEWELRY LOG ~ (o- 05/20/09 1 1
Li-21 62NJ-00006 PRODUCTION PROFILE 05/2M09 1 1
A-31A AZCM-00023 USIT ;t~ - Q {~ f. 05/22/09 1 1
H-196' 62WY-00004 MEM PROD PROFILE ~ 05/07/09 1 1
G-16 AYKP-00022 SCMT J/- 05/09/09 1 1
M-196 AY3J-00024 SCMT 05/15/09 1 1
12-37 AWL9-00032 PROOUCTION PROFILE _ L,/C.~ ~ OM21/09 1 1
11-04A AYQQ-00028 USIT ~ L( _ 05/21/09 1 1
18-30 B1JJ-00015 MEM PROD PROFILE >G/ 05/13/09 1 1
4-14A/S-37 AYKP-00024 PRODUCTION PROFILE ~-' 1 05/11/09 1 1
3-37/L-35 AWL9-00035 PROD/INJECTION PROFILE 05/22/09 1 1
3-37/L-35 AWL9-00035 TEMPERATURE SURVEY 05/20/09 1 1
V-217 AYQQ-00024 INJ PROFILE/RST WFL `} /~j(~ 04/26/09 1 1
YLtASt AGKIVUWLtUtit FitGt1Y1 tfT `.iIGIVINti AIVU Fitl UFSNINI.i UIVC GVY7 tA(:t1 IU:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. 8enson Blvd.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
~ ~
BAKER
F~~Jl~NES
Eaker Atlas
PRINT DISTRIBUTION LIST
(;UMYANY ~3Y ~;XYLUIZA'1'IUN (ALASKA) 1N(;
WELL NAME X-30A
FIELD PRUDHOE BAY UNIT
CUUN1'Y NUR"1'H SLUYr; t3UKUU~iH
STATE ALASKA
DATE 11/4/2008
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY
SO #: 1563395
Copies of Copia Digital Copia of Copia Digital
Each Log of Film Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS
Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS
Address LR2-1 Address 550 WEST 7TH AVE
900 E BENSON BLVD. SUITE 802
ANCHORAGE, AK 99508 ANCHORAGE, AK 99501
1 Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address 800 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE, AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Wes~eld, Houston, Texas 77073
This Disttibution List Completed Bv:
~
Jr
^0~~0~0
c~
Page I of I
~ ~
BAKER
Nt~6HE5
C;UMYAN Y
WELL NAME
FIELD
Baker Atlas
PRINT DISTRIBUTION LIST
liY ~XYLUKAI'1(JN (ALASKA) 1NC CUUN'1'Y NUIt'1'H SLUY~ 13UlZUUCiH
X-30APB1 STATE ALASKA
PRUDHOE BAY UNIT DATE 11/4/2008
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY
SO #: 1563395
Copia of Copia Digital Copia of Copia Digital
Each Log of Film Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OII, & GAS
Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS
Address LR2-1 Address 550 WEST 7TH AVE
900 E BENSON BLVD. SUITE 802
ANCHORAGE. AK 99508 ANCHORAGE, AK 99501
1 Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address 800 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated Bv BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073
This Dishibution List Comnleted Bv:
~
n ~
A~~
~o~
Page I of 1
~ ~
B4KER
M V6ME5
(;UMYAN Y
WELL NAME
FIELD
Eaker Atlas
PRINT DISTRIBUTION LIST
t3Y ~XYLUKP,'1'lUN (ALASKA) 1NC CUUN'lY NUK'1'H JLUY~ t3(JRUUGH
X-30APB2 STATE ALASKA
PRi TDHOF. BAY IJNIT DATE 11/4/2008
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY
SO #: 1563395
Copies of Copia Digital Copia of Copia Digital
Each Log of Film Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS
Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS
Address LR2-1 Address 550 WEST 7TH AVE
900 E BENSON BLVD. SUITE 802
ANCHORAGE. AK 99508 ANCHORAGE, AK 99501
1 Company EXXON MOBIL PRODUCTION CO Company
Person FII,E ROOM Person
Address S00 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE. AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated Bv~ BAKER ATLAS-PDC 17015 Aldine Wesffield, Houston, Texas 77073
This Distribution List Comqleted Bv:
~
Page 1 of 1
i #
INTEC~ Log ~ Data Transmitta~ Fo~~
To: State of Alaska -AOGCC
333 W. 7t'` Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: X-30A, X-30APB1, X-30APB2
Contains the foilowing:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
! 1 color print - GR Directional Measured Depth Log (to follow)
1 color print - MPR/Directional TVD Log (to follow)
1 color print - MPR/Directional Measured Depth Log (to follow)
~6~- f~~"`~ ~ t ~l(75
LAC Job#: 1563395 ~~~~~0
l~ ~ U3
Sent by: Catrina Guidry Date: 11/04/08F
Received by: ~ Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING Y4UR COPY
1+A~: (yU7) 26~-66Z3
~ ~'
~
BAKER
HtlC~S
INTEQ
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska 99518
Direct: (907) 267-6612
FAX: (907) 267-6623
12/19/07
~ _~
~~~Iumber~er
NO. 4525
Alaska Data & Consulting Services Company: State of Alaska
zszs Gamben Street, suite aoo Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: eeth 333 West 7th Ave, Suite 100
Anchorage, AK 99507
Field: P.Bay, Milne Pt., Lisburne
~IVP_~~ .1f1h !f I nn Ilncrrintinn I1~}n RI Cnin. t`n
15-39A 11661174 MCNL '~ 09/24/07 1 1
14-32 11676967 RST 09/14/07 1 1
X-30A 11649992 CH EDIT PDC GR (JEWELRY LOG '} y y 10/06107 1
03-36A 11745217 CH EDIT PDC GR (USIT) ~ ~ V~'C- 05/03/07 1
75-30A 71767139 MCNL - 09105107 2 7
18-126 11216204 MCNL 07/04/06 2 1
E-216 11733205 MCNL -/G~ $ 12/07/05 2 1
P2-56 11686777 RST - 08/08/07 2 1
H-33 11686792 RST ~L ,r ~ 10/20/07 2 1
06-16 11686797 RST _ - < 11/15/07 2 1
L2-16 11626482 RST 05/10/07 2 1
D-22B 11661167 MCNL Q - ~ 5 OS/26/07 2 1
03-14A 17212846 CH EDIT SDCL GR (USIT~ ~~(p ~(~8 ~'J ( 04/24/06 2 1
MPB-21 PROD 11628749 MCNL (MEM PPROF) ~f -~~ ~~~ 4 j?, 01/15107 2 1
C-22A 40013486 OH MWD/LWD EDIT („ -p ~ ~~~ 05110i06 2 1
E-15C 40013555 OH MWD/LWD EDIT a0 -(o (~ 'rt "~~d 06103/06 2 1
~ ~~/~JC MVf\I~V WI~GNVG RC~rCIr ~ oi JIb1Y11YV NIYU RC 1 URIVIIVb VIVt I.CJYT tHGtl 1 V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1 b.
900 E. Benson Bivd. ~ `w: ! . ° ~. ,l ~~~ e,.~.. ~~~
Anchorage,Alaska 99508 ~ ~
Date Delivered: 4 ~ 'p; ,~~~~i ~
~~ ?,x ~ ,.
~` a~'~,
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
r you nave any questions, ptease contact t~ougtas liortcn at tne rli~.; at ~b4-4y i3
Deliverv Contents
G-256PB1 ~o~- -D~S(p "~` ~ 5~~~
X-30A ~ a~--63 a' ~ S~~ ~
X-30AP61 ~o'}-p'~-~ 15'3'~ ~
X-30APB2 ~p~.~~ ~ S~-~
„ n /~
Please Sign and Return one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
, , -~ -=~°
Attn: Christine Mahnken > ss ~ ,' ~' ~~
333 W. 7th Ave, Suite 100 ''
Anchorage, Alaska 99501 _ _. `' ' ~ '
.,-:
~=~
-_ ~
. ~ ~;
p~
. ~,_~~.~::~ ~ ~
Petrotechnical Data Center LR2- l
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 1 9-66 1 2
• •
INTEQ
ri.~
BAKER
HUGNES
7260 Homer Drive
Anchorage, Alaska 99518
Tel 907-267-6600
Fas 907-267-6623
To Whom It May Concern: November 16, 2007
Please find enclosed directional survey data for the following wells:
G-09B
05- lOC
OS-22C
K-08B
X-30APB 1 ~
X-30APB2 f
X-30A ,/
X-20A
Enclosed for each well is:
2ea copies of directional survey reports
1 ea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration(Alaska)Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
• ~~iir~d 1
RECEIVED BY. (J , State of Alaska AOGCC
DATE: ~ ~ .~ l~
Cc: State of Alaska, AOGCC
~ c~~] - ~7~
~~~'V' ,t ~~ ~ ~ ~
~ STATE OF ALASKA ~ ~~~~'~ ~~v ~ ° ~ ~ a
ALAS IL AND GAS CONSERVATION COM SSION ~'~~I ~~~a~J~
WELL COMPLETION OR RECOMPLETION REPORT
AND LOG ~ ~
Al~~ka Qi) & G~~ Eaii~ ~~'t~~~~~~~`
1 a. Well Status: ~ Oil ^ Gas ^ Ptugged ^ Abandoned ^ Suspended
zoaac 2s.~os zoAa,c Ze.»o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. WeN Class. '~'
Development ^ Exploratory
i tratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban
10/9/2007 ~ 12, Permit to Dnll u r
207-078 -
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
9/21/2007~ 13. API Number
50-029-22550-01-00 "
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
10/3/2007~ 14. Well Name and Number:
PBU X-30A-
4722
FSL, 876
FEL, SEC. 07, T90N, R14E, UM
Top of Productive Horizon:
2183' FNL, 198' FEL, SEC. 18, T10N, R14E, UM
8. KB (ft above MSL): 70.1' -
Ground (ft MSL): 39.1'
15. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
4313' FNL, 436' FWL, SEC. 17, T10N, R14E, UM 9. Plug Back Depth (MD+ND)
14274 9054 Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 665022 y- 5939553 Zone- ASP4 10. Total Depth (MD+ND)
14320 9053 16. Property Designation:
ADL 047475 ~
TPI: x- 665876 y- 5932665 Zone- ASP4
Total Depth: x- 666564 y- 5930549 Zone- ASP4 11. SSSV Depth (MD+ND)
None 17. Land Use Permit:
18. Directional Survey ~ Yes ^ No
Submit electronic and rinted inform tion r 20 AAC 25.050 ~ 9• Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD DIR, GR, RES, MCNL / GR / CCL -E v~\ ~ l~ I
22• CASING, LINER AND CEMENTING RECORD ~I~1Il~~t
CASING • SEITfNG DEPTH MD SETTING DEPTH NQ HOLE AMOUNT i`
' WT. PER FT. GRADE TOP BOTfOM ' TOP BOTfOM SIZE GEMENTING RECORD PULLEd'i
20" 91.5# H-40 31' 111' 31' 111' 30" 260 sx Arctic Set A rox.
10-3/4" 45.5# NT80 30' 3277' 30' 3083' 13-1l2" 965 sx CS III, 375 sx'G', ~40 sx CS II
7-5/8" 29.7# L-80 27' 11628' 27' 8924' 9-7/8" 265 sx Class 'G'
5-1/2" 17# L- 0 11482' ' 885 ' 9043' 6-3/4" 185 sx Cla s'G'
3-1/2~~ x 3-3/16" 9.2# / 6.2# L-80 12 06' 14320' 9026' 9053' 4-1/8" 112 sx Class'G'
x 2-7/8" / 6.16#
23. Open to production or inject ion? ~ Yes ^ No 24. 7uaiNC R~co~~
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Size and Number): S2e ~EPTH SET MD PACKER SE7 MD
2" Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr801 L-80 11485' 11307' & 11438'
MD ND MD TVD
13360' - 13650' 9038' - 9038'
13720' - 14270' 9039' - 9-54' 25. . Ac~a, FRacTUC~e, Gean~Nr SauE~,' ~rc.
~ '
DEPTH INTERVAI MO AMOUNT sc Kt1YD OF MATERtAL USED
2000' Freeze Protected with Diesel
ZC). PRODUCTION TEST
Date First Production:
November 3, 2007 Method of Operation (Flowing, Gas Lift, etc.):
Gas Lift
Date of Test:
11/3/2007 Hours Tested:
6 PROOUCr~or, FoR
TESTPERIOD OIL-BBL:
798 GAS-MCF:
1,315 WATER-BBL:
81 CHOKE SIZE:
176 GAS-OIL RATIO:
1,647
Flow Tubing
Press. 220 Casing Press:
960 Cn~cuv+reo
24-HouR RArE.~ OIL-BBL:
3,193 GAS-MCf:
5,260 WATER-BBL:
324 OIL GRAVITY-API ~CORR~:
Z7. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No
If Yes to either question, list formations and intervafs cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descnptions, core chips, photographs and laboratory analytical resufts per 20 AAC 250.071.
~ ~ ' ~~,:~:~=:~C~ ~~~
None , ~j~~
~~~MlS 1~~~. NOV ~ S 1007 `'l0-!-~
~~' ;
. . ~... . ~.~,~.,,
Form 10-407 Revised 02/2007 ~~~~ CONTINUED ON REVERSE SIDE ~ ~{' ! ~ ~ ~\' ~ ~ /*
, 1 ~ <J V c~
ZH. GEOLOGIC MARKERS ~LIST ALL FORMATIONS AN RS ENCOUNTEREb~: 29. FORMATION TESTS
* NAME ND Well Teste . ^ Yes ~ No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Kicked off just below the top of the None
Sadlerochit and stayed in that
zone all the way to TD.
Marker from Parent Well:
Sadlerochit ! Zone 4 19 918' 9006'
Formation at Total Depth (Name):
Sadlerochit / Zone 4 11918'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the fo
ing is true and correct to the best of my knowledge.
~
Si
d
r`~~~
gne
~
Terrie Hubble ~ Title Drilling Technologist Date
PBU X-30A 207-078 PreparedeyName/Number. Teriie Hubble, 564-4628
Well Number Drilling Engineer: Greg Sarber, 564-4330
Permit No. / A roval No.
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Iren~ 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITenn 13: The API number reported to AOGCC must be 14 digits (ex; 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost ir~ Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
ITe~ 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
Iaboratory information required by 20 AAC 25.071.
ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
~
~
BP EXPLORATION Page 1 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date ( From - To I Hours I Task I Code I NPT I Phase I Description of Operations
9/9/2007 I 06:00 - 07:00 1.00 I MOB I P I PRE
07:00 - 07:30 I 0.50 MOB I P I I PRE
07:30 - 09:00 1.50 MOB P PRE
09:00 - 13:30 4.50 MOB P PRE
13:30 - 14:00 0.50 MOB P PRE
14:00 - 18:00 4.00 MOB P PRE
18:00 - 21:00 I 3.001 MOB I P I I PRE
21:30 - 00:00 I 2.50 MOB p I PRE
PRE
19/10/2007 I 00:00 - 02:00 I 2.001 MOB I P I I PRE
02:30 - 06:00 3.50 MOB p I PRE
PRE
06:00 - 09:30 3.50 MOB P PRE
09:30 - 10:15 0.75 MOB P PRE
10:15 - 13:30 3.25 MOB P PRE
13:30 - 14:15 0.75 MOB P PRE
14:15 - 18:00 3.75 MOB P PRE
18:00 - 18:30 0.50 MOB P PRE
18:30 - 21:00 2.50 MOB P PRE
21:00 - 21:30 0.50 MOB P PRE
21:30 - 00:00 2.50 MOB P PRE
9/11/2007 00:00 - 02:30 2.50 MOB P PRE
02:30 - 03:00 0.50 MOB P PRE
03:00 - 03:30 0.50 MOB P PRE
03:30 - 05:30 2.00 MOB P PRE
05:30 - 06:00 I 0.50 MOB P I ~ PRE
06:00 - 06:30 0.50 MOB P PRE
06:30 - 09:15 2.75 MOB P PRE
09:15 - 12:00 ~ 2.75I MOB I P I PRE
12:00 - 15:00 3.00 MOB P
15:00 - 17:20 I 2.33I BOPSUF~ P I I PRE
Wait on completion of PS1 lift.
Called security to assist in rig move. Crew change conduct
walkabout to look at location and make ready to mob
Safety Meeting with Crew and Security
Traveled Pad 10 to Oxbow
Travel from Oxbow tumoff to XPad Lease road
Travel on mats from Spine Road to X-Pad
Traveled down X Pad road on Mats.
Stacking rig mats 2 high prior to moving rig back.
Rig on standby.
Change out with day crew 7 PJSM. wait for loader to shuffle rig
mats.
Back up rig on 2 tier of rig mats.
Lay rig mats out in single file. - 1/3 way down access road.
Rig on standby.
Continue to lay rig mats out in single file.
Rig on standby.
Travel down X Pad access road on rig mats.
Stacking rig mats 2 high prior to moving rig back.
Rig on standby. at 07:00 hrs, 1/2 way down access road
Crew change, moved rig back 200 yards. Moving rig mats
Travel down X Pad access road on rig mats
Stacking rig mats prior to moving rig back.
Travel down X Pad access road on rig mats
Stacking rig mats prior to moving rig.
Crew change out & PJSM.
Stacking rig mats prior to moving rig.
Trave! down X Pad access road on rig mats.
Stacking rig mats prior to moving rig.
Continue to stack rig mats prior to moving rig.
Move rig onto front side of X pad. Park rig while loaders move
rig mats over access road to rear of pad.
Move rig to backside of pad.
Place rig mats in front of well. Get work permit signed. Remove
work platform from around well head. Place dunnage under
front side of BOP skid. Move & spot rig on rig mats in
preparation to back over well.
Wait for DSO to make change out before spotting rig over well.
Crew change out & PJSM.
Held PJSM, lined rig up and moved rig over well and set down.
Leveled rig. Installed cutting box, and DSM rigged up tiger tank.
PJSM and pulled BPV with lubricator
Rig accepted at 07:00 hrs 9/11/2007
RURT Filled pits with 500 bbl of 2% KCL Spotted Office camp
and 40 mancamp
RU to circulate well to Tiger tank PT surface lines to 3000 psi
check integrity (OK)
Circulate down IA and recover 40 bbi of diesel to tiger tank
Circulated 40 bbl down IA and recovered 40 bbl of diesel and
circulated it to tiger tank. Checked fluid (SW), Switch to
I pumping down tubing. Qp = 3 bpm 200 psi. Took 200 bbl to
tiger tank before bring back into pits. Circulated 300 bbl with 1
I drum of SafeSurfO. SD pump and check flow OK
Printetl: 1o/z3/zoo7 3:oo;O5Pn9
~ •
BP EXPLORATION : Page 2 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30
Event Name: REENTER+COMPLE7E
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date I From - To I Hours ~ Task I Code + NPT
Spud Date: 4/11/1995
Start: 8/7/2007 End:
Rig Release:
Rig Number:
Phase I Description of Operations
9/11/2007 I 17:20 - 19:00 I 1.671 BOPSUFdP
19:00 - 20:00 I 1.001 BOPSUa P
20:00 - 23:30 I 3.501 BOPSUFd P
9/12/2007 00:00 - 06:00 6.00 BOPSU P
06:00 - 06:30 0.50 BOPSU P
' 06:30 - 13:00 6.50 BOPSU P
13:00 - 18:00 5.00 BOPSU P
18:00 - 19:30 1.50 BOPSU P
19:30 - 23:00 3.50 BOPSU P
23:00 - 00:00 I 1.001 PULL I P
19/13/2007 I 00:00 - 01:30 I 1.501 PULL I P
01:30 - 06:00 4.50 PULL P
06:00 - 07:00 1.00 PULL P
07:00 - 08:00 1.00 PULL P
08:30 - 09:00 0.50 PULL P
09:00 - 18:00 9.00 PULL P
18:00 - 20:00 2.00 PULL P
20:00 - 20:30 0.50 PULL P
20:30 - 20:45 0.25 EVAL P
20:45 - 22:00 1.25 EVAL P
22:00 - 00:00 I 2.001 EVAL I P
~ 9/14/2007 I 00:00 - 02:15 I 2.25I EVAL I P
02:15 - 03:00 I 0.75 EVAL I P
03:00 - 04:15 1.25 WHSUR P
WHDTRE RU to dry rod in TWC. Open well and well is u-tubing. Resume
circulation to balance well.
WHDTRE Hold PJSM with crew to discuss plan. Install TWC in tubing
hanger. Pressure test from below to 500 psi.
WHDTRE Hold PJSM with crew & FMC. Secure lines. ND tree and
remove from cellar.
WHDTRE Continue to NU 13-5/8" BOP stack
WHDTRE Crew change, PJSM and discussed plan forward
WHDTRE RU to conduct shell test on BOP. Replacing orings on SLB
ubricator with shooting flange and replaced the seal in graylock
connections. Working on getting a shell test, grayloc fitting
leaking. AOGCC witnessing BOP test
WHDTRE BOP test and repairing grayloc fitting in cellar on choke line
need fix the clamps, trouble with choke valve 3& 4. Finally
tested CM4 and wheras CM3 need rebuilt. Finished BOP test.
WHDTRE Crew change. Hold PJSM with crews. PU DSM lubricator to
rig floor. MU and pressure test same. Engage and pull two
way check from tubing hanger profile.
Remove lubricator from rig.
WHDTRE Hold PJSM. ND shooting flange from on top of annular. NU
flow riser. Fill with KCL and check for leaks.
DECOMP Rig up floor to pull completion. Bring Halliburton spooler and
spools on to floor and spot same.
DECOMP Continue to rig up to pul( tubing.
Tubing up weight: 151 k# with no "extra overpull.
Monitor well for flow.
Pull hanger to floor. Break out hanger and landing joint.
Secure two control lines to spooler.
DECOMP Pull and LD 52 jts 4-1/2" IBT tubing and jewelry.
DECOMP Crew change, PJSM and disscussed the hazards of pulling
completion Conducted walkabouts
DECOMP Unload Pipe shed, LD 10 jts
DECOMP Held PJSM on crane lifting spool off of the rig. Lifted HES spool
off of the rig
DECOMP Pulling 4-1/2" completions Filling hole ever 10jts. Unloading
pipe shed every 40 jts layed down. LD a total of 253 jts
DECOMP Continue to LD 4-1/2" completion equipment.
Inspect chemical cut. Max OD is 4.75" due to a lip on one side
of cut. Overshot should go with a little push. Length of cut
section recovered is 20.31',
DECOMP Rig down handling equipment on the rig floor. Clean up floor.
I RUNCMP Hold PJSM with SLB and Nordic. Review job steps, hazards,
safe areas, rig up & rig down procedures.
RUNCMP Spot and rig up SLB slickline unit. Bring tools and equipment
to rig floor.
RUNCMP Run 6.65" OD GR/JB run. Tag at 11,400' SL depth. POOH.
Run 6.0" LIB. Tag stub at 11,400'. POOH. Nice circulare
impression w/ slight flaring on one side. Looks like twin to cut
joint recovered.
RUNCMP Continue with slickline runs.
Run 3.8" swedge to drift tubing stub. Tag at 11438'. POOH.
RUNCMP Hold PJSM. Rig down SLB slickline equipment.
RUNCMP Load 45 jts 3-1/2" 15.5# drill pipe into pipe shed. Strap same.
Printed: 10/23/2007 3:00:05 PM
~ ~
- BP EXPLORATION Page 3 ofi 25
- Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/14/2007 04:15 - 06:00 1.75 WHSUR P RUNCMP Make up bit sub and 42 jts of 3-1/2" drill pipe.
06:00 - 08:30 2.50 WHSUR P RUNCMP PU RTTTS and SS Control Vallve and set RTTTS at 70 ft.
POOH and stood back DP in the derrick.PT the pascker and 2"
air lin ruptures. Ref traction RPT # 2007-IR-2406859. Close 2"
valve and PT the packer to 2000 psi
08:30 - 09:30 1.00 WHSUR P RUNCMP Held a PJSM and discussed the incidient that occurred while
trying to PT the packer. Root cause is the equipment failured
occured because the 2" HP valve was not shut and cap to
isolated this LP air line that is used for blowing down the
surface lines. The pressure s test was conductred but the PT
was not discussed in detail. Held PJSM dealing with packoff
work.
09:30 - 12:30 3.00 WHSUR P RUNCMP Pulled out old packoff, landed new FMC packoff and RILDS.
Test packoff to 5000 psi 15min OK
12:30 - 13:00 0.50 WHSUR P RUNCMP PJSM on pulling RTTS and laying down DP
13:00 - 15:15 2.25 WHSUR P RUNCMP RIH and screwed into SSCV and unset RTTS. PU and lay
down packer and 42 jts 3-1/2" drill pipe
15:15 - 15:30 0.25 WHSUR P RUNCMP PJSM on unlaoding pipe shed and loading tubulars for
completion
15:30 - 16:00 0.50 RUNCO RUNCMP Unload 3-1/2" dp from pipe shed.
16:00 - 18:00 2.00 RUNCO RUNCMP Loading and prep 4-9(2" tubing
18:00 - 00:00 6.00 RUNCO RUNCMP Continue to load and prep tubing in pipe shed.
9/15/2007 00:00 - 03:30 3.50 RUNCO RUNCMP Continue to load, drift, and strap 4-1/2" tubing in pipe shed.
03:30 - 04:00 0.50 RUNCO RUNCMP Hold PJSM with crews and service hands. Rig up floor to run
pipe.
04:00 - 06:00 2.00 RUNCO RUNCMP MU tail pipe assembly w/ X nipple, overshot, packer, and X
nipple assembly. Baker lock components.
06:00 - 18:00 12.00 RUNCO RUNCMP RIH with 4-1/2" completion using Doyon Torque Tum
Average 22 jts per hours. 180 jts in at 18:00 hrs
18:00 - 00:00 6.00 RUNCO RUNCMP Continue to run 4-1/2" completion.
9/16/2007 00:00 - 00:30 0.50 RUNCO RUNCMP Continue to run in hole with 4-1/2" completion.
00:30 - 02:45 2.25 RUNCO RUNCMP 124k# up, 86k# dn wt with 266 jts in hole.
See very good indication of shear screws shearing. Tag 3.9'
deeper. Tag up 11.7' in on jt # 268.
LD extra pipe. MU 18' of space out pups one full jt below
hanger.
MU tubing hanger. Drain BOP stack. Land completion.
Ran a total of 266 jts 4-1/2" 12.6# 13Cr VAM TOP tbg.
Spaced out 4' above btm out in overshot.
02:45 - 03:15 0.50 RUNCO RUNCMP Rig down floor after running completion.
03:15 - 03:30 0.25 RUNCO RUNCMP Hold PJSM with crew and SLB slickliners. Reviewjob,
hazards, lifting equipment, safe area and more.
03:30 - 04:00 0.50 RUNCO RUNCMP Spot slickline unit. Bring tools and equipment to floor.
04:00 - 15:15 11.25 RUNCO RUNCMP Run in hole to retrieve RHC plug set in X nipple at 11,330'. RIH
with 3.8" OD ^TS and tagged at 11402 ft. Worked down to
11,436 ft WLMD, PU was clean. Acted like there was
" something in front of the TS. POOH, PU and RIH with 17' 3.7"
OD Dummy WS. Tagged the PBTD at 11,438 ft. POOH to
reset RHC plug RIH and reset RHC plug at 11,331 ft. POOH.
Held PJSM and RD wireline. Good Job
15:15 - 15:30 0.25 RUNCO RUNCMP PJSM on circulating wellbore
15:30 - 15:45 0.25 RUNCO RUNCMP RU to reverse circulate wellbore
15:45 - 17:35 1.83 RUNCO RUNCMP Reverse circulating 2% KCL with corrosion inhibitor down IA
Printed; 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 4 ofi 25
Operations Summary Report
Legai Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/16/2007 15:45 - 17:35 1.83 RUNCO RUNCMP Qp = 2.90 / 2.99 bpm Pp = 215 psi Trips set at 500 psi
17:35 - 18:00 0.42 RUNCO RUNCMP Dropped ball and rod and wait 30 minutes to allow to fall
18:00 - 18:30 0.50 RUNCO RUNCMP Crew change. Make rounds on rig. Hold PJSM to discuss
testing procedure.
18:30 - 22:45 4.25 RUNCO RUNCMP Line up to set packer. Pressure tbg to 4000 psi. Holding
steady for 10 minutes. 2" high pressure hose fitting on floor
started leaking. Bleed tbg. Repair leaking fitting.
, Test tubing to 4000 psi for 30 minutes. Bled down to 3925 psi.
I Bleed tbg to 1500 psi.
Pressure test tbg x csg ann to 3500 psi. Sall fitting feak in
cellar. Bleed pressure to repair same. Test IA to 3500 psi for
30 minutes. Minimal bleed off.
Bleed tbg and shear DCK valve. Circ to verify shear.
22:45 - 00:00 1.25 RUNCO RUNCMP Hold PJSM with Little Red. Dicsuss job steps, hazards, safe
area and more. SPot unit. Rig up hose and pressure test
same to 4000 psi. Pump 65 bbls diesel down the IA taking
returns up the tubing.
9/17/2007 00:00 - 00:15 0.25 RUNCO RUNCMP Rig down Little Red.
00:15 - 01:30 1.25 RUNCO RUNCMP Rig down floor. Back out landing joint. Drain BOP stack.
01:30 - 02:15 0.75 BOPSU P WHDTRE Set two way check with FMC. Test from below to 500 psi.
200 psi remaining on IA due to diesel/kcl balance.
02:15 - 06:00 3.75 BOPSU P WHDTRE Hold PJSM with crew to discuss removing riser and 13-5/8"
BOPs.
Pull upper riser through floor. ND lower riser. ND kili & choke
lines. ND BOPs. Set on skid.
06:00 - 11:30 5.50 BOPSU P WHDTRE RU to install 13-5/8" X 4-1/2" tree adaptor Make up landing jt to
TIW valve with TCII threads. Crane in the Farr tongs and crane
out the 4-1/2" thread protectors. PT adaptor to 5000 psi 10 min
OK, NU tree and PT same to 5000 psi
11:30 - 17:45 6.25 BOPSU P WHDTRE Suck diesel out of tree and nipple down tree and adaptor.
Changed out SBMS (Straight Bowl Metal Seal) and stabbed
tree back on wellhead to retest. PT the adaptor and then PT
the tree.Test results the same on the tree. Ordered new
adaptor and SBMS seal Removed tree and adaptor Installed
new adaptor with SBMS. PTadaptor to 5000 psi and tree to
5000 psi. Good test. The poor manufacturing QAQC on the
adaptor flange was the reason the tree would not PT. Sent old
adaptor flange to FMC Anchorge.
17:45 - 18:30 0.75 RIGD P WHDTRE Crew change and make ready to back off of well.
18:30 - 00:00 5.50 RIGD P WHDTRE Back off well. MU lower double gate to upper BOPs. Spot in
cellar. MU kill and choke valves to mud cross.
9/18/2007 00:00 - 01:30 1.50 RIGU P WHDTRE Lift BOPs. Move rig back over well. Re-spot equipment all
equipment.
01:30 - 01:45 0.25 RIGU P WHDTRE Hold PJSM to dicuss nipple up work in cellar.
01:45 - 05:30 3.75 RIGU P WHDTRE Continue to NU BOPs to tree. NU choke and kill lines.
SIMOPS: Hold PJSM with Veco & SLB. Lift reel from trailer
and install in reel house/stand. RU hard line in side reel.
Continue to NU BOPs.
05:30 - 10:30 5.00 RIGU P WHDTRE Service valves and make ready to conduct shell test on 7-1/16"
BOP Installed shorter studs on 7" Otis cross-over. Filled stack.
PT BOP. Bob Nobie w/ AOGCC wavered wittness+ng the BOP.
Choke manifold wiil not test. Installed 2-3/8" test joint and try
and test 2-3/8" combi's Tree valve not holding
Printed: 10/23/2007 3:00:05 PM
~ ~
- BP EXPLORATION Page 5 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/18/2007 10:30 - 15:30 5.00 WHSUR P WHDTRE BOP Test
15:30 - 15:45 0.25 WHSUR P WHDTRE Held PJSM on pulling TWC.
15:45 - 17:45 2.00 WHSUR P WHDTRE RU DSM lubricator and PT to 500 psi. Pulled TWC and WHP
= 0 psi. RD Lubricator
17:45 - 18:30 0.75 RIGU P WHDTRE Hold PJSM with wireline crew. Spot SLB unit. Crew change
with rig and wireline crew
18:30 - 21:00 2.50 RUNCO RUNCMP Bring tools to floor. Rig up to run slickline.
Run in hole. Recover ball & rod from 11,330'.
21:00 - 00:00 3.00 RUNCO RUNCMP Run in hole to pull DCK valve from GlM #5. recover valve.
Run in hole to set dummy in GLM #5.
9/19/2007 00:00 - 02:30 2.50 RUNCO RUNCMP Continue to slickline. Retrieve RHC plug body.
02:30 - 03:00 0.50 RUNCO RUNCMP RD SLB slickline.
03:00 - 06:00 3.00 STWHIP P WEXIT PJSM with crews. PU injector and position on floor. Repair
packoff oiler system
Rig up to pull coil across pipe shed. Pull and stab same in to
injector.
06:00 - 09:15 3.25 STWHIP P WEXIT Load coiled tubing with 80 bbl of flo-pro Prep wire end for
reversing fluids
09:15 - 13:15 4.00 STWHIP P WEXIT Cut CT following slack management Cut15 ft and found wire.
Megged wire (OK) Installed CTC and rehead. Pull tested to
40k. BHI heading up. PT CTC and QC's to 3500 psi
13:15 - 13:30 0.25 STWHlP P WEXIT PJSM on PU CO BHA
13:30 - 14:45 1.25 STWHIP P WEXIT PU 5 ft lubricator. Set injector in bung hole and PU BHA as per
WSL. PU BHA and stabbed on well
14:45 - 17:00 2.25 STWHIP P WEXIT Set counters and run in the hole to clean out plugs. RIH to 220
ft and open EDC
17:00 - 17:50 0.83 STWHIP P WEXIT Circulate wellbore to flo-pro
Qp = 2.5 bpm at 3340 psi
WHP = 117 psi
17:50 - 18:15 0.42 STWHIP P WEXIT SD and close EDC. trying to work past the stub at 11,400 ft
Tried several thing and was unable to pass 11,400 ft.
18:15 - 18:30 0.25 STWHIP P WEXIT PUH to confirm tie-in at 11300 ft. Add 2' corcection. This
should put us on depth.
18:30 - 19:15 0.75 STWHIP P WEXIT Tag up again at 11398'. Attempt to mill ahead. 4160 psi fs at
2.49 bpm in. Appear to be milling ahead. MiII 1.1' to 11,399'.
Driled off. Run in hole circulating. Tag at 11,432'. Mill ahead
from 11433.1. Mill to 11434'. Lost all rtns.
19:15 - 20:45 1.50 STWHIP P WEXIT Reduce circ rate to 1.1 bpm. RIH chasing plugs to PBTD of
12,995'. Retums slowly increasing while RIH.
Tag up at 12,626'. Mill through and continue in hole. Tag at
12,912'. Stall several times. Discuss with town. This is deep
enough.
Return line plugging off some where at surface.
20:45 - 21:15 0,50 STWHIP P WEXIT Isolate choke manifold and well. Open hard line to check for
restriction. Cleared same. WHP back to 30-70 psi (normal).
21:15 - 22:15 1.00 STWHIP P WEXIT Log CCL down from 12,600' to 12,912'. Getting a lot of
material back over shaker.
Getting gas back to surface. Send rtns outside. Monitor flow
back tank and down stream hard line pressure. Returns
cleaned up. Bring fluid back inside.
22:15 - 00:00 1.75 STWHIP P WEXIT Circulate out of hole at 80%. Continue to get some material
across shaker.
Printed: 10/23/2007 3:00:05 PM
~ ~
~
x~
BP EXPLORATION Page 6 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From = To Hours Task Code NPT Phase Description of Operations
9/19/2007 22:15 - 00:00 1.75 STWHIP P WEXIT Power pack not working quite right. High injector hydraulic
pressure, slow pull rate (35 fpm).
9/20/2007 00:00 - 03:30 3.50 STWHIP P WEXIT Continue to circulate out of hole. Continue to get black
"sludge" from well in decreasing amounts.
Trouble shoot injector while POOH with SLB mechanic.
Continue to POOH. Jog back in hole to 250', then tag up
again.
03:30 - 05:30 2.00 STWHIP P WEXIT Get off well. Unstab coil. LD milling BHA.
Prep whipstock setting BHA. Orient to tray face.
Work on SLB injector.
05:30 - 09:30 4.00 STWHIP P WEXIT Stab coil. Get on well. RIH Working on injector Stopped at
11590 ft to tie-in to PDC
09:30 - 10:15 0.75 STWHIP P WEXIT Logging tie-in Tied in to to of Sag (-12 ft)
10:15 - 10:30 0.25 STWHIP P WEXIT RIH to 12,600 ft
10:30 - 11:25 0.92 STWHIP P WEXIT RIH logging with CCL to 12,880 ft. Stopped CCL log and
conducted wt check 48.5k
Orient TF to 30 deg LOHS. RIH to 12912 ft and PU to 12,888
ft, closed EDC and set TOWS at 12,876 ft. Set at 3400 psi and
a bit. PU, free and RIH set wt.
11:25 - 14:45 3.33 STWHIP P WEXIT POOH filling hole at 1:1
MM plugged off while POOH
BHT at 224 deg in the perF area. BHT increased in the
perForated intervals
14:45 - 16:45 2.00 STWHIP P WEXIT PJSM prior to tagging up. LD WS setting BNA. PU milling
BHA # 3
16:45 - 19:45 3.00 STWHIP P WEXIT RIH with milling BHA open EDC mixing flo-vis to brin LSRV's
up to 60k.
Get a little gas back. Flow check negative. Continue to RIH.
19:45 - 20:15 0.50 STWHIP P WEXIT Log GR tie in to geo's PDC log from 11,660'. Subtract 18'
correction.
20:15 - 20:45 0.50 STWHIP P WEXIT Continue to run in hole. Tag whipstock at 12,883' ~
20:45 - 00:00 3.25 STWHIP P WEXIT Mill ahead from 12,883'. 3450 psi at 2.38 bpm in/2.35 out.
Establish pattem.
~
' MiU ahead at 0.1' per six minutes. DHWOB varying from 0.38
to 1.78k#. Mill to 12,886'.
9/21/2007 00:00 - 02:45 2.75 STWHIP P WEXIT Continue to mill window from 12,886'. 3450 psi fs at 2.36
in/out. DPSI: 120. DHWOB: 0.0 to .75 k#. Drilled off to no
WOB at 12,889.2'. Drill formation to 12900'.
"Uncorrected" TOW is 12880'. BOW: 12891'. RA tag: 12,889'
These may be adjusted once RA is tied in to PDC log.
02:45 - 03:30 0.75 STWHIP P WEXIT Back ream window three times. Dry drift running in hole.
Appears to be smooth. 42k# coil up wt.
03:30 - 06:50 3.33 STWHIP P WEXIT Open EDC. Circulate out of hole.
06:50 - 08:10 1.33 STWHIP P WEXIT Tagged up, LD Milling BHA and gauge mills.
08:10 - 13:30 5.33 DRILL P PROD1 RU and revese in 80 bbl SW for slack management. Cut off 30
ft CT and 4 ft wire. Install CTC and pulled test to 36k Rehead
and PT to 3900 psi. PU BHA #4 with USR tool
13:30 - 14:15 0.75 DRILL P PROD1 Set counters and install UTM on level wind.
14:15 - 16:45 2.50 DRILL P PROD1 RIH with build section BHA Started pulling mud out of pits for
upcoming mud swap
16:45 - 17:00 0.25 DRILL P PROD1 Log tie-in at 11,632 ft, -23 f. The counter wheel on the injector
looks like it slippping from slug build up on the wheel or wheel
Printed: 10/23l2007 3:00:05 PM
~ ~
BP EXPLORATION Page 7 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From = To 'Hours Task ` Code NPT Phase Description of Operations
9/21/2007 16:45 - 17:00 0.25 DRILL P PROD1 worn out Stop to look at counter wheel on injector
17:00 - 18:45 1.75 DRILL P PROD1 Pulled wheel off of injector and calipered same. Installed new
wheel Closed EDC Corrected counter to -23 ft.
Attempt to get UTIM working. No go. Remove same from
horsehead.
18:45 - 19:15 0.50 DRILL P PROD1 Run in hole with drilling assembly. Through window ok with TF:
30L. Tag btm at 12,900'. Start new mud down the hole.
19:15 - 00:00 0.00 DRILL P PROD1 Drill ahead from 12,900'. 3550 psi fs at 2.46 in/out. DPSI:
10-50 WOB: 0.52 k#. IA/OA/PVT: 441/70/335.
WHP/BHP/ECD: 45/4613/9.90 ppg. TF: 65L.
Complete mud swap.
ROP: 20-40 fph.
9/22/2007 00:00 - 00:30 0.50 DRILL P PROD1 Wiper trip to 11630'.
00:30 - 01:15 0.75 DRILL P PROD1 Log GR tie in from 11,630'. Add 2'. Log RA tag at 12,889'.
No correction.
Official TOW is 12,880', BOW: 12,891', RA tag: 12,889'.
01:15 - 06:10 4.92 DRILL P PROD1 Drill ahead from 13,050'. 3355 psi fs at 2.40 in/out. 100-150
DPSI. WOB: 0.5-1.0 k#. ECD: 9.87 ppg.
ROP: 30-55 fph.
06:10 - 06:35 0.42 PROD1 Wiper trip to 12,900 ft
06:35 - Q9:10 2.58 DRILL P PROD1 Drilling Lateral from 13,200 ft 13350 ft
Qp=2.40/2.41 bpm
CTP = 3400 psi BHP = 4608 psi ECD = 9.89 ppg
Vp = 348 bbl
WOB/ROP = 0.58 klb / 70-80 fph
09:10 - 09:40 0.50 DRILL P PROD1 Wiper trip to window
09:40 - 10:10 0.50 DRILL P PROD1 Drilling Lateral from 13,350 ft
Qp=2.40/2.41 bpm
CTP = 3400 psi 3831 psi BHP = 4621 psi ECD = 9.92 ppg
Vp = 341 bbl
WOB/ROP = 0.58 klb / 70-80 fph
10:10 - 13:30 3.33 DRILL N PROD1 Became differential stick while drilling, Worked pipe with and
without pump. Called for dead crude from CH2MHill SD and
allow wellbore to relax, work pipe. Tried pumping down annular
without much luck. bTried several thing without much success
13:30 - 14:23 0.88 DRILL N PROD1 RU 1.psia crude. and pumped 10 bbl down CT followed by 75
bbl of flo-pro and shut down to allow to soak
14:23 - 15:15 0.87 DRILL N PROD1 Work CT between 0 k and 85 k. Alfow to soak. Pumped
1 interval and allow to soak. Pulled loose at 84k and some luck
15:15 - 16:30 1.25 DRILL N PROD1 PUH to circulate hole and tie-in. Pulled through windown open
EDC and PUH circulating at 3.00 bpm. Took 45 bbl of crude to
tiger tank. Choke manifold line became plugged
16:30 - 17:30 1.00 DRILL N PROD1 Work to unplug choke manifold line on 2nd level. RIH to
11,632 ft. Recovered large pieces of composite plug and bird
nested metal from window/ and/or whipstock.
17:30 - 17:45 0.25 DRILL P PROD1 Tie-in Corrected +11 ft
17:45 - 18:30 0.75 DRILL P PROD1 RIH to TOWS and close the EDC, orien the TF and RIH to
tie-in to RA marker. No correction.
18:30 - 19:00 0.50 DRILL P PROD1 Run in hole to bottom.
19:00 - 22:00 3.00 DRILL P PROD1 Drill ahead from 13,384'. 3550 psi fs at 2.41 in/out.
W06:1-2k#. ECD: 9.88 ppg. PVT: 285 bbls.
Difflcult to keep the coil moving. Frequent stails trying to get
on btm.
Printed: 10/23/2007 3:00:05 PM
~
~
BP EXPLORATION Page 8 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To Hours Task Code NPT
9/22/2007 22:00 - 22:45 0.75 DRILL P
22:45 - 00:00 1.25 DRILL P
9/23/2007 00:00 - 02:45 2.75 DRILL P
02:45 - 03:30 0.75 DRILL P
03:30 - 06:45 3.25 DRILL P
06:45 - 08:20 1.58 DRILL P
08:20 - 09:00 0.67 DRILL P
09:00 - 10:45 1.75 DRILL P
10:45 - 12:00 1.25 DRILL P
12:00 - 12:35 0.58 DRILL P
12:35 - 14:00 1.42 DRILL P
14:00 - 17:30 3.50 DRILL P
17:30 - 18:30 1.00 DRILL P
18:30 - 19:30 1.00 DRILL P
19:30 - 22:30 3.00 DRILL N SFAL
22:30 - 23:30 1.00 DRILL P
23:30 - 00:00 0.50 DRILL P
9/24/2007 00:00 - 02:45 2.75 DRILL P
02:45 - 03:00 0.25 DRILL P
03:00 - 03:45 0.75 DRILL P
03:45 - 06:00 2.25 DRILL P
Spud Date: 4/11/1995
Start: 8/7/2007 End:
Rig Release:
Rig Number:
Phase Description of Operations
PROD1 Wiper trip to window.
PROD1 Drill from 13,446' to 13,471'.
PROD1 Drill ahead from 13,471'. 3650 psi fs at 2.45 in/out. 100-300
DPSI. WOB: 1-1/8k#.
ECD: 9098 ppg. INC/AZM/TF: 89.7/146,2/80L.
PROD1 Wiper trip to window.
PROD1 Drill ahead to 13591', Hard to get to slide, several stalls.
PROD1 Wiper trip SD pump at 12,900 and pulled through the WS.
Open EDC and PUH to 12,000 ft circualting at max rate. RIH
and tied in at RA marker at 12,889 ft Corrected +4 ft
PROD1 RIH, the shale at 13,125 ft is being seen on this wiper trip.
Having some trouble getting past 13,125 ft. Got past at 1.00
bpm and backed reamed. RIH and worked through RIH
PROD1 Drilling from 13,626 ft to 13,657 at 120L TF
Qp = 2.30 / 2.29 bpm at 3650 psi off bottom
WHP / BHP =- 37 / 4,682 psi EDC at 10.05 ppg.
Inc/Azm/TF = 92 deg / 131 deg / 120L
Possible fault area at 13,610 ft, seen signs of pyrite in samples
Still having problems keeping constant WOB seeing motor
stalls (slipstick) Making 60 ft wiper trip to try and drill. Ordered
mud swap, old mud at 0.9 solids
Phil w/ 1M1/WT watching drilling parameters to famailizing
himself with drilling monitors. Delta P off bottom is 361 psi.
with stalls at 1650 to 2000 psi delta P
PROD1 Wiper trip wating on new flo-pro drifling and started mud swap
PROD1 Trying to drill and started conducting mud swap
PROD1 Drilling from 13,657 ft at 120L TF
Qp = 2.30 / 2.29 bpm at 3,650 psi off bottom
WHP / BHP =- 37 / 4,200psi EDC at 10.05 ppg.
Inc/Azm/TF = 92 deg / 131 deg / 120L
ROP picked up to 80 fph with new mud around BHA. Still
seeing stacking even with new mud in the hole Working our
way through the fault res deep looks to be inverted. Still having
stacking and stalling problems.
PROD1 POOH to PU new motor and agitator. 79 stalls Open EDC
above WS, circulated at max rate while POOH. Tested agitator
on surface (OK)
PROD1 Flow check. Get off well. Unstab coil. LD motor.
Crew change. Perform rounds to check rig.
PROD1 Configure and check MWD tools on catwalk.
Hold PJSM with all hands.
MU lateral drilling assembly with resistivity and agitator tools.
PROD1 E-line not testing. Trouble shoot at reel. MWD shack, not
trouble found. Flnally started working again.
PROD1 Complete make up of MWD tools. Stab coil. Get on well.
PROD1 Run in hole. Circ at min rate.
PROD1 Test agitator. Continue to run in hole with lateral drilling
assembly. Circulate at min rate.
Agihator S/N: AS318-05-114HF (new/rebuilt)
PROD1 Log GR tie in from 11,635'. Subtract 15' correction.
PROD1 Continue to run in hole.
PROD1 Drill ahead from 13668'. 3900 psi fs at 2.3 in/out. 200-300
2-3k# DHWOB.
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 9 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Refease:
Rig Name: NORDIC 2 Rig Number:
Date From = To Hours Task Code NPT Phase Description of Operations
9/24/2007 03:45 - 06:00 2.25 DRILL P PROD1 ECD: 10.08 pg. ROP: 30-45 fph. INC/AZM/TF: 93.06/125.9 /
115L.
Looks like we could be drilling in the Shublick GR
06:00 - 09:00 3.00 DRILL C PROD1 PUH for wiper to review the present geological interperation
with town.
Pulled bit into liner, open EDC, work CT and circulate while
WOO
09:00 - 12:15 3.25 STWHIP C WEXIT POOH to PU AI billet, Inspected the 1st 200 ft of CT in Bad
pipe at 140 ft, several spot of deep chemical depressions that
need to be cut out.
12:15 - 15:30 3.25 STWHIP C WEXIT LD BHA Cut off 203 ft CT. Megged line, OK. Installed
dimple connector. Pulled test to 36k, OK. Reheaded BHI's
UQC Changed out SLB swivel joint. Load billet into pipe shed
15:30 - 15:40 0.17 STWHIP C WEXIT PJSM on PU and handling Billet BHA.
15:40 - 17:00 1.33 STWHIP C WEXIT PU Billet BHA.
17:00 - 20:00 3.00 STWHIP C WEXIT RIH with aluminum billet. See a few weight bobbles in 5-1/2"
liner. Slow down accordingly. Hole cleared up. Resume 60
fpm coil speed.
20:00 - 20:30 0.50 STWHIP C WEXIT Log GR tie in from 12,915'. Subtract 18' correction.
20:30 - 21:00 0.50 STWHIP C WEXIT Run in open hole. 22k# dn, 46k# up wt at 13,300'. RIH to
setting depth of 13,450'.
21:00 - 21:10 0.17 STWHIP C WEXIT Run to 13461. PU to up weight. Orient to 180 deg. Billet top at
13450'. Pressure up coil. Tool sheared/set at 3850 psi circ
press. PU to verify release from billet. BHA free.
I 21:10 - 00:00 2.83 STWHIP C WEXIT Pull out of hole. Fill hole through coil.
9/25/2007 00:00 - 00:30 0.50 STWHIP C WEXIT Continue to pull out of hole with billet setting BHA. Hold PJSM
to review BHA procedure.
~ 00:30 - 01:45 1.25 STWHIP C WEXIT Tag up. Flow check. Get off well.
LD Baker tools. Check float sub in Inteq tools.
MU 1.5 deg mtg w/ HTC STR324 bit. Scribe mtr. Stab coil and
I test tools.
01:45 - 05:00 3.25 STWHIP C WEXIT Unable to communicate with DGS in MWD tool string. Trouble
shoot same. Eventually replace it. Configure tools. Make up
BHA.
Stab coil. Get on well. Run in hole.
05:00 - 07:00 2.00 STWHIP C WEXIT Run in hole. to 7572 ft and found a short in the eline.
07:00 - 09:39 2.65 STWHIP C WEXIT RIH and tied in at 11610 ft„ made -22 ft correction, RIH and
confirmed tie-in at RA Marker. RIH and tagged to top of the
Billet and orient TF to 165 RHS
09:39 - 12:30 2.85 STWHIP C WEXIT Start time drillinq at 13448.6 ft at 5min / 0.1 ft for 1' 2 min/ 0.1
ft.
Qp 2.37 / 2.37 bpm CTP = 3660 psi. 3754 psi on bottom
12:30 - 15:40 3.17 STWHIP C WEXIT Reaming window from 13,438 ft to 13,470 ft several time at 45
L &45 R.
15:40 - 18:45 3.08 STWHIP C WEXIT POH for lateral BHA.
98:45 - 18:55 0.17 STWHIP C WEXIT Flow check well. PJSM regarding BHA handling.
18:55 - 21:20 2.42 STWHIP C WEXIT Close EDC & power down tools. Pop injector off well. Break
BHA off of coil connector. Blow down & purge BHI tools with air
& water. Break BHI tools off of mud motor & lay down on
catwalk. MU new BHI tool string & test on catwalk. Dial down
motor to 0.8 AKO. Install used Hycalog Bi-center bit. Set up
new BHI database. Simultaneously change out o-ring on P-14
on the SLB traction motor - tested good.
Printed: 10l23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 10 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date from - To Hours Task Code NPT Phase Description of Operations
9/25/2007 21:20 - 21:30 0.17 STWHIP C WEXIT PJSM regarding handling BHA.
21:30 - 22:00 0.50 STWHIP C WEXIT PU BHI tool string & attach mud motor. PU injector & stab coil
onto tool string & stab injector onto well. Power up & test tools.
Zero depths.
22:00 - 00:00 2.00 C Pf20D1 RIH.
9/26/2007 00:00 - 01:00 1.00 DRILL C PROD1 Continue to RIH. Continue to add 776 lubes to active pits.
01:00 - 01:20 0.33 DRILL C PROD1 Log down for tie-in from 12,930ft to 12,957ft. (-21ft corr).
01:20 - 03:40 2.33 DRILL C PROD1 Precautionary ream to bottom.
2.40 bpm @ 3878psi.
Slight motor work @ 13,140ft. Tag up @ 13,450ft - PU. Tag up
@ 13470ft while pumping min rate & going 6ft/min. Back ream
area with 165R TF @ 4fUmin. RIH & keep tagging up @
13,450ft. Vary TF & pump rate & attempt to get down. Vary
runing speeds while trying with & without pumping. Eureka,
made it past lip of OHWS with 1.6bpm @ 20ft/hr with 160R TF.
Ream some more - made it past top of OHWS @ 2.6bpm with
no problems.
03:40 - 06:15 2.58 DRILL P PROD1 Drilling from 13,470 ft at 255L TF
Qp = 2.270 / 2.23 bpm at 3,900 psi off bottom
WHP / BHP = 40 / 4,771psi EDC at 10.25 ppg.
DHWOB = .5-.3KIbs ROP 40-60 ff/hr.
Drill to 13590' and stall. Had clean pickup @ 45k
06:15 - 06:35 0.33 DRILL N PROD1 Ease back to TD and stall again. Pickup and were diff stuck.
Attempt to pull free at 70k w/o success. SD pump and wait.
Pull free on second try at 78k
06:35 - 06:50 0.25 DRILL P PROD1 Wiper to window. Have trouble getting by the OH WS and after
4 tries become bit stuck (wedged in aluminum) w/o getting
rough (46k max pull) and w/ minimal pump
06:50 - 08:30 1.67 DRILL N STUC PROD1 Work to free BHA (bit stuck) from aluminum WS concentrating
initially going down. Able to cycle from 13447-13460' (46k to
-8k). Work w/ orientor until orientor would not move due to
high amps (in a bind). Begin to pull in 5k stages to 65k and
see -13.5k BHI wob and have no progress. Concentrate again
in the downward mode to save wear on CT. Pump
occasionally, but motor is still stalled
08:30 - 09:15 0.75 DRILL N STUC PROD1 Get more aggressive and work in stages to 85k surface wt and
see -24.4k BHI wob and make no progress. Pump thru stalled
motor at 1.0/4000 to get baseline rate. CT life is 20% at reel
and 17% at gooseneck
09:15 - 10:00 0.75 DRILL N STUC PROD1 Discuss. WOO
10:00 - 20:00 10.00 DRILL N STUC PROD1 WO SWS to load 15% HCL and bring to location
Pump occasionally to move fluid and verify returns
20:00 - 20:30 0.50 DRILL N STUC PROD1 Call X-pad Operator / BP radio & restrict backside of pad from
access. PerForm face to face / SIM Ops meeting with pad
operator & e-line people on X-20. PJSM regarding acid
handling & high pressure pumping & neutralizing / taking
returns to TT. Flag off rig floor to limit entry.
20:30 - 20:45 0.25 DRILL N STUC PROD1 Begin shipping KCL fluid to acid pump. Prime up acid pump &
pump 3 bbls of KCL (.4bpm @ 3000 psi) & pressure test to reel
manifold to 5000 psi - good test.
20:45 - 20:50 0.08 DRILL N STUC PROD1 Resume pumping KCL down coil. Pumping @ 0.96 bpm in /
0.91 bpm out @ 4100 psi.
20:50 - 21:20 0.50 DRILL N STUC PROD1 10bbls of KCL away. Start pumping 9.05 ppg 15°lo HCL acid
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 11 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of ~perations
9/26/2007 20:50 - 21:20 0.50 DRILL N STUC PROD1 down the coil. Pumping @ 0.94 bpm in / 0.86 bpm out @ 3900
psi.
21:20 - 21:35 0.25 DRILL N STUC PROD1 16 bbls of 15% HCL away. Start pumping KCL @ 0.92 bpm in /
0.88 bpm @ 3600 psi.
' 21:35 - 22:20 0.75 DRILL N STUC PROD1 10 bbls of KCL away. Start to displace coil with rig pump.
Pumping Flo-Pro @ 1.00 bpm in / 0.96 bpm out @ 3650 psi.
22:20 - 22:40 0.33 DRILL N STUC PROD1 76 bbls away. Reduce pump rate to 0.5 bpm. Pumping @ 0.5
bpm in / 0.46 bpm out @ 2150 psi.
22:40 - 23:15 0.58 DRILL N STUC PROD1 5bbls of acid outside bit. Stop pumping & wait. 15 min has
passed, take coil wt from 24500 Ibs to 5000 Ibs & wait another
15 min.
23:15 - 00:00 0.75 DRILL N STUC PROD1 CT wt @ 5800 Ibs. Start pumping @ 0.5 bpm & pump 1 bbl.
Stop & wait, CT wt @ 5900 Ibs. After 15 min CT wt = 6300 Ibs,
stack more wt. CT wt = 1500 Ibs, pump @ 0.5 bpm for 1 bbl &
wait for 15 min, C"f wt = 1700 tbs. Stack more wt, CT wt =
-1400 Ibs, pump @ 0.5 bpm for 1bbl & wait for 15 min. It is
apparent that we are stacking more surface weight & the
DHWOB is not increasing, DHWOB is only fluctuating - 1000
Ibs compared to surface. Take CT wt to -6700 Ibs & pump 1bbl,
seeing reactive DHWOB now 5500 to 3000.
9/27/2007 00:00 - 01:00 1.00 N STUC PROD1 PU to get CT wt back & pump 1 bbl & wait 15 min. Set down
CT wt =-7000, DHWOB = 1300. Line up to fill over top - 0.5
bbls. Take CT wt down to -17,000, DHWOB = 1000, pump 1
bbl & wait 15 min. PU to get wt back & pump 1 bbl & wait 15
min. Set down CT wt =-16000, DHWOB = 0, pump 1 bbl &
wait.
01:00 - 02:30 1.50 N STUC PROD1 All acid is out of coil Beqin circulatina Ccil 1bom. Pumn 1(1 hhlc
& no retums. PU to 50k & 60k while pumping - no returns. Call
town engineer & discuss options. Cycle pipe - no luck. Fill
across top of hole to ensure hole is full . Open ECD & try to
establish returns @ 1 bbl/min, 1.5, 2, & 2.5 bbl/min - no
returns. Close EDC & pressure up well.
02:30 - 02:45 0.25 N STUC PROD1 Leave pressure on tool string - 900 psi. Send command to
disconnect from tool string, pressure dumped. Disconnected
from tool @ 13,383ft top of fish, fish len th = 65ft - 89 inc.
Took - 10k over string weight to disconnect, pump & try to
ciean up hole.
02;45 - 05:15 2.50 N STUC PROD1 POH circulating @ 1.4 bpm. Divert returns to TT to neutralize
acid returns.
05:15 - 06:15 1.00 N STUC PROD1 Take rerums inside. Call BP radio &1ift pad restriction.
Continue to POH.
06:15 - 06:30 0.25 N PROD1 Crew change/BHA LD safety mtg
06:30 - 07:00 0.50 N PROD1 Fin POH. LD top of EDC and PC sections of MWD assy
complete w/ o-rings on EDC. No marks on BHA
07:00 - 07:15 0.25 P PROD1 Weekly function test of BOPE rams as required by AOGCC
07:15 - 09:15 2.00 P PROD1 RU hydraulic cutter and cut 502' of CT and e-line to move wear
spot
09:15 - 11:00 1.75 P PROD1 Install CTC. PT 40k, 4000 psi. Head up BHI
Bring BTT tools to floor
11:00 - 11:10 0.17 P PROD1 Safety mtg re: MU fishing assy
11:10 - 11:45 0.58 N STUC PROD1 MU 3" BTT GS spear w/ 1/4" orfice w/ Bowen up/dn jars + 3
each 4' wt bars + Bowen accelerator jars + BHI PC and EDC
assy w/ FVS
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATIQN Page 12 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
~
Date From - To Hours Task Code NPT Phase
9/27/2007 11:45 - 12:30 0.75 N PROD1
12:30 - 12:45 0.25 N PROD1
12:45 - 13:30 I 0.75
13:30 - 14:00 0.50
14:00 - 15:30 1.50
N
N
N
PROD1
PROD1
PROD1
15:30 - 22:30 7.00
22:30 - 00:00 1.50
9/28/2007 00:00 - 02:30 2.50
02:30 - 02:40 I 0.17
02:40 - 02:55 0.25
02:55 - 05:25 I 2.50
05:25 - 05:45 0.33
05:45 - 06:50 1.08
06:50 - 07:15 I 0.42
07:15 - 08:15 I 1.00
08:15 - 09:00 I 0.75
09:00 - 09:30 I 0.50
N
N
N
N
N
PROD1
PROD1
PROD1
PROD1
PROD1
N PROD1
N PROD1
N PROD1
N PROD1
N PROD1
N PROD1
N I IPRODI
Description of Operations
RIH w/ BHA #9 circ thru GS 0.34/1420 to 3737'
CT pinholed at horsehead from a fatigue crack on the low side.
PJSM. Swap to filling from the BS. Flag pinhole
Note: Due to high pump pressures (2.3/4000 FS when drilling)
from the excessive length of CT on the reel (currently
+/-20540') we need to cut about 4000' anyway to have a
chance to run the WWT Tractor tool which will add +/-500 psi
POOH filling from the BS
LD fishing BHA. Change out packoff
Stab back on. Change out leaking isolation valve on standpipe
manifold (40 min). Rev circ 25 bbls rig water into CT to pump
slack back and leave water in CT for cutting operations. Cut off
CTC and set injector back
RU CT cutter. Cut 2-3/8" CT and e-line and dispose into metal
dumpster. Avg 500'/40 min
Have completed cutting 4000 ft of coil, removed 3 pin holes.
Meg wire - test good. Set cutter on rig floor. Install CTC.
Pull test CTC to 40k - good test. Rehead BHI connector. MU
test plate & PT - good test.
PJSM regarding handling BHA.
Open swab & PU fishing BHA (3" BTT GS spear w/ 1/4" orFice
w/ Bowen up/dn jars + 3 each 4' wt bars + Bowen accelerator
jars + BHI PC and EDC assy w/ FVS) & MU to coiL Stab
injector onto well. Fill across top to fill hole. Power up & test
tool - good test. Set counters.
RIH with fishing BHA. Circulate min rate through GS while RIH.
Sat down @ 11485ft, tumed pumps off & RIH @ 40ft/min -
passed through. Continue to bottom. WT ck @ 12,850ft = 45k
up & 20k RIW.
Set down @ 12,921ft. Increase pump rate to 1 bbl/min &
passed through. Slight set downs in shale area from
13,120ft-13,175ft. WT ck @ 13,300ft = 43k.
Currently at 13,337ft. Retums coming back apear to be slightly
gas cut. Pick up hole while circulating @ 1.55 bbls/min
(3000psi). Get manual reading of 8.5 ppg. Blow down MM to
verify reading. MM is reading 8.65. Continue to PUH circulating
bottoms up during crew change (45k at 6'/min, 1.54/2930).
Had sli overpull and packing off in shale area 13150-13130'.
Had 3k over from 13050-13000'. PUH to 12950' which puts top
of BHA inside window. BU was uneventful
RBIH at 0.35/1480 at 20'/min. Had 8k wt loss twice over
13160-13170', other wise OH was clean. Tag at 13408' CTD at
20'/min 0.35/1400 then SD pump
.PUH 55k and had fish on. Flag at 20k (45k up, 18k neutral)
Begin using down jars for +/-25 cycles. Getting 2-4k down jar
licks. No movement
Start jarring up at 70k and get 3k jar licks. Work in stages of 5
at 70k, 75k and 80k. After 2 licks at 80k, lost wt quickly back to
53k and started pulling up the hole. Start filling from the BS
PVT 225
POOH slowly at first w/ 53k and see more overpulls at known
~ tite spots-looking encouraging. Pull thru window w/ 58k at
I 12925'. Decide not to go back down since need to check the
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 13 of 25
Operations Summary Report
Legal Wefl Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Qperations
9/28/2007 09:00 - 09:30 0.50 N PROD1 BHA anyway. POOH with 5k over at 70'/min to EOT. No
09:30 - 12:00 2.50 N PROD1
12:00 - 12:15 0.25 N PROD1
12:15 - 14:00 1.75 N PROD1
14:00 - 15:00 1.00 N PROD1
15:00 - 16:00 1.00 N PROD1
16:00 - 19:30 3.50 N PROD1
19:30 - 19:45 0.25 N PROD1
19:45 - 21:30 1.75 N PROD1
21:30 - 23:00 1.50 N PROD1
23:00 - 00:00 1.00 N PROD1
9/29/2007 00:00 - 02:00 2.00 N PROD1
I 02:00 - 04:00 2.00 N PROD1
04:00 - 04:55 I 0.92I I N I I PROD1
04:55 - 05:50 ~ 0.92I I N I I PROD1
05:50 - 06:40 I 0.831 I N I I PROD1
06:40 - 06:50 0.17 N PROD1
06:50 - 09:45 2.92 N PROD1
09:45 - 10:30 0.75 N PROD1
10:30 - 11:45 1.25 N PROD1
11:45 - 15:05 3.33 N PROD1
15:05 - 15:25 0.33 N PROD1
15:25 - 15:55 0.50 N PROD1
16'20 - 17:15 I 0 92I I N I I PROD1
overpull coming thru tailpipe
Continue POH w/ 5k over while filling from the BS. Inspect
weld of used CT to new CT at 1218' on reel
Safety mtg re: LD BHA
Chk for flow PVT 165
Set injector on legs for SWS mechanics work. Service injector
LD fishing BHA. Recover and LD most of the fish ... orienter
body had pulled off of the drive sub leaving the shaft (+/-5'),
FVS (1.89'), mud motor (10.8') and bi bit (0.71' SN 118287) in
the hole with top at +/-13430'
SWS finish maint work on power pack. Change grips on Little
Jerks
MU sidetrack assy w/ R60ST bit and 1.7 deg motor. PT CTC
@ 4000
RIH w/ BHA #11 circ thru EDC 0.48/1200. SWS mechanics
adjust injector
Log down for tie-in from 12,875ft (-19ft).
Continue RIH. Trouble shoot DHWOB sensor. Continue on
without it. RIH & knock off brass cap on end of the bit.
Begin troughing from 12,970ft to 13,OOOft with 165R TL @
'I OOff/hr. 2.6 bpm in / 2.56 bpm out @ 3650 psi. Troughed three
times.
Stop at 12,999ft & begin time drilling. Time drill @ 1ft/hr for the
first 3 feet.
Continue to time drill @ 1ft/hr for the first 3 feet.
Stacking weight & no appreciable amount of motor work. Pick
up to 12,990ft & RIH to 13,001.5ft. Stacking weight & no motor
work. Pick up to 12,998ft & drill at - 5- 8 ft/hr with constant
speed.
Near bit inclination shows 6 degrees variance versus previous
wellbore that was drilled. PU 20ft & perform check shot surveys
every 5 ft to confirm that we are kicked off. We have kicked off
& is earlier than planned. KOP = 12,973ft.
Resume drilling & try to build angle and tum to the left from
13,005 ft at 320L TF
Qp = 2.63 / 2.59 bpm at 3,660 psi, 3550 psi off bottom.
Have reached target of NBI 91-92 degrees, TVD = 8982ft.
Perform check shot surveys to confirm azm, but have mag
interferrence from parent wellbore. Will determine where we
are later (LRC)
Wiper to window was clean. Open EDC
POOH for lateral assy circ thru EDC 2.6/2900
LD sidetrack assy. Bit had one missing outside cutter
MU lateral assy w/ bi bit and 0.8 deg motor
RIH w/ BHA #12 circ thru bit 0.52/1670
More injector adjustments
Log tie-in down from 12915' 0.3/1410 corr -21'
Precautionary ream to TD at 2.4/3400 at 2-10'/min w/ one
stall/PU at 180 TF change at 13005'. Backream tp 12985'
clean
Resurvey at selected points at 0.5/1550
Drill from 13053' 2.40/3350/110L w/ 300 psi diff, 0-1k wob at 92
Printed: 10l23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 14 of 25
Qperations Summary Report
',
~Legal Well Name: X-30
Common Well Name: X-30
~ Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Start: 8/7/2007
Rig Release:
Rig Number:
Spud Date: 4/11/1995
End:
~ Date From - To Hours Task Code NPT Phase I Description of pperations
9/29/2007 16:20 - 17:15 0.92 N PROD1
17:15 - 17:25 0.17 N PROD1
17:25 - 17:35 0.17 N PROD1
17:35 - 17:45 0.17 N PROD1
17:45 - 18:00 0.25 N PROD1
18:00 - 18:30 0.50 N PROD1
18:30 - 22:00 3.50 N PROD1
22:00 - 22:30 0.50 N PROD1
22:30 - 22:50 0.33 N PROD1
22:50 - 00:00 1.17 N PROD1
I 9/30/2007 I 00:00 - 00:30 I 0.50I I N I ~ PROD1
00:30 - 00:50 0.33 N PROD1
00:50 - 02:10 1.33 N PROD1
02:10 - 02:40 0.50 N PROD1
02:40 - 03:15 0.58 N PROD1
03:15 - 03:40 0.42 N PROD1
03:40 - 05:20 1.67 N PROD1
06:40 - 07~35 I 0.92I I P I I PROD1
07:35 - 08:00 0.42 P PROD1
08:00 - 11:00 3.00 P PROD1
11:00 - 11:40 0.67 P PROD1
11:40 - 12:00 0.33 P PROD1
12:00 - 12:20 0.33 P PROD1
12:20 - 15:30 3.17 P PROD1
deg and control drill at 100-120'/hr. Have to keep wob to keep
vibration down, but sand is so soft that can't keep wob. Drill
with +18k string wt! Unfortunately have to PU to get surveys
due to vibration. WOB is not working again. Drill to 13110'
Note: Got a shaker load of HOT shavings back from sidetrack
ops
Wiper back thru OH sidetrack at 15'/min was clean
Park at 12970' while BHI works on wob software
Wiper back to TD was clean
Drill from 13110' to 13122'
BHI is working on WOB software, again.
Drill from 13122' 2.48/3650/30L w/ 300 psi diff, 1.5-2.5k surFace
wob at 90 deg and control drill at 100-120'/hr. PVT 198 bbls.
Drilled to 13300'
Wiper to window. 45k up wt. Clean trip to the window.
Wiper to bottom. Clean trip to bottom.
Drill from 13300' 2.25/3450/135L w/ 200 psi diff, 1.5-2.5k
surface wob at 93 deg and control drill at 100-120'/hr. PVT 187
bbls.
Midnite depth was 13365'
Continue to drill from 13365' 2.25/3450/135L w/ 175 psi diff,
1.8-2.8k surface wob at 91 deg and control drill at 100-120'/hr.
PVT 181 bbls.
Drilled to 13400'
100' wiper trip - clean.
Continue to drill from 13400' 2.20/3400/75L w/ 175 psi diff,
2.8-4.8k surface wob at 89 deg
ROP = 80-100'/hr. PVT 181 bbls.
Conduct mud swap @ 1:45
Drilled to 13470'
Wiper to window. Wiper to window was clean.
Log down for tie-in twice (+7ft corr).
Wiper to bottom - clean. New mud at surface.
Drill from 13477' 2.25/3340/110L w/ 400 psi diff, 1.8-3k surface
wob at 90 deg inc. ECD = 10.05
ROP = 90-120'/hr.
Drilled to 13604'
Wiper to window was clean
Drill from tag at 13602' 2.4/3250/110L w/ 100-300 psi diff, 0-2k
wob (BHI wob still does not work) at 90 deg at 70-120'/hr w/
10.2 ECD. Drill to 13645' and hole got sticky (diffl. Have
several 20k overpu~ls while drilling to 13652'. Geo's want res
tool in at 13700'
Wiper to window
Open EDC at 12865'. POOH circ thru EDC 3.0/3330
LD drilling BHA
Reverse slack back w/ 15 bbls FW prior to CT cutting
operations
Safety mtg re: Nordic crew change day/CT cutting
Cut off CTC. Find e-line at 46'. Cut off and dispose of the
remaining 1278' of 2-3/8" CT from the used reel that had been
welded to the new reel to reduce the risk of pinholes/parting
from pitting found during prior cuts. That leaves 15457'
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 15 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/30/2007 15:30 - 17:30 2.00 P PROD1 Instail CTC. PT 35k. BHI rehead. PT 4000. Circ excess
water to bung hole
17:30 - 18:00 0.50 P PROD1 MU lateral BHA w/ resistivity
18:00 - 18:30 0.50 P PROD1 Change out & PJSM regarding handling BHA.
18:30 - 19:10 0.67 P PROD1 MU rest of BHA. Stab coil onto BHA. Stab injector onto well.
19:10 - 21:35 2.42 P PROD1 Set counters. Power up & test tools. Open EDC & RIH
circulating.
21:35 - 22:05 0.50 P PROD1 WT ck = 43k up, 19k. Stop pumping & close EDC. Log down
for tie-in (-22ft)
22:05 - 22:45 0.67 P PROD1 Wiper to bottom.
22:45 - 23:20 0.58 P PROD1 Drill from 13652' 2.40/3350/90L w/ 300 psi diff, 1.5-2.4k
DHWOB at 88 deg inc. ECD = 10.17
ROP = 90-110'/hr.
Drilled to 13719'
23:20 - 23:30 0.17 P PROD1 Stop drilling & PU hole 150'. Bottom's up revealed a thick
congealed glob of viscus Flo-Pro goo running off the shaker -
3bbls. Start running the centrifuges.
23:30 - 00:00 0.50 P PROD1 Drill from 13652' 2.25/3200/135L w/ 300 psi diff, 1.5-2.4k
DHWOB at 90 deg inc.
ECD = 10.12 ROP = 90-120'/hr. PVT = 295bb1s.
Dnlled to 13763'
10/1/2007 00:00 - 00:20 0.33 P PROD1 150ft wiper.
00:20 - 00:50 0.50 P PROD1 Drill from 13763' 2.25/3200/105L w/ 300 psi diff, 1.0-2.Ok
DHWOB at 87 deg inc.
ECD = 10.12 PVT = 290bb1s.
ROP = 90-150'/hr.
Drilled to 13800'
00:50 - 01:25 0.58 P PROD1 Wiper to window - clean.
01:25 - 03:40 2.25 P PROD1 Reduce pump rate & MAD pass from 12990' to 13650'
03:40 - 03:50 0.17 P PROD1 Wiper to bottom from 13650'
03:50 - 04:35 0.75 P PROD1 Drili from 13800' 2.32/3400/105L w/ 350 psi diff, 1.0-2.5k
DHWOB at 87 deg inc.
ECD = 10.15 PVT = 283bb1s. DHT = 182 deg. ST = 83 deg.
ROP = 30-130'/hr.
Drilled to 13850'
04:35 - 04:40 0.08 DRILL P PROD1 100' wiper. Clean both ways.
04:40 - 05:45 1.08 P PROD1 Drill from 13850' 2.28/3350/105L w/ 300 psi diff, 1.0-2.5k
DHWOB at 87 deg inc.
ECD = 10.18 PVT = 280bb1s. DHT = 182 deg. ST = 84 deg.
ROP = 30-130'/hr.
Drilled to 13950'
05:45 - 07:15 1.50 P PROD1 Wiper to window was clean
07s15 - 08:25 1.17 P PROD1 Swap to right side and drill from tag at 13950' 2.48/3160/90R
w/ 150-450 psi diff, 0.5-2.5k wob w/ ~ 0.3 ECD at 85 deg at avg
60'/hr. 70' wiper at 13995' due to stacking was clean w/o TF
change. Drill to 14006' and stacking
08:25 - 08:40 0.25 P PROD1 Wiper due to stacking at 15'/min. PUH to 13960' and puli 15k
over. Go back down and can't. PUH to 13930' at 15k over.
Attempt to go back down and can't. PUH to 13910' (bit depth)
at 15k over and can't go back down. Acts like something is
alongside BHA
08:40 - 09:20 0.67 N STUC PROD1 Work CT both directions with and without pump up to 85k and
down to -10k with no movement with bit at 13910'. Can move
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 16 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of ~perations
10/1/2007 08:40 - 09:20 0.67 N STUC PROD1 orientor. Can circ at normal FS of 2.5/3200 so are not bit
stuck. WOB is not changing so appears that the stuck point is
above the DPS which is -50' above the bit and in a shale area.
Pressure well to 500 psi and work pipe and had no movement.
Bleed off press
09:20 - 10:30 1.17 N PROD1 Park w/ neg wt on BHA and circ 2.52/3210 BU sample up while
discuss
Clean Z4 sand in sample, returns have no significant shale
10:30 - 11:40 1.17 N PROD1 SD pump for an hour and cycle up to 85k and down to injector
trip at -15k every 30 min
MIRU LRS. Initial vapor test was 2.1 psi at 90 deg and ADW
limit is 1.5 psi. DSM has no tankers loaded with dead crude so
LRS picked up the best dead crude they could find at Flow 1.
Roli LRS tank to red VP
91:40 - 12:00 0.33 N PROD1 Resume pump at 2.58/3208 w/ full returns and stacking -14k
while wo VP to subside
12:00 - 12:50 0.83 N PROD1 Open EDC at neutral wt then circ 2.50/2720, 3.0/3270 Cycle
occasionally between 55k and -10k
12:50 - 13:30 0.67 N PROD1 Close EDC at neutral wt then circ 2.55/3150. Cycle again with
and without pump between 80k and max down wt of -15k w/o
success. Pull a bind and pressure wellbore to 1000 psi, then
surge several times w/o success
13:30 - 13:50 0.33 N PROD1 Circ 1.1/1750 w/ full returns while have safety mtg w/ LRS. VP
check is 1.0 psi. PT LRS @ 3000 psi
13:50 - 14:30 0.67 N PROD1 LRS load CT w/ 15 bbls of 7.21 ppg 86 deg crude at 1.0/1670.
Rig displace w/ mud at 2.0/2740 CTV=58
14:30 - 16:30 2.OQ N PROD1 Pumped 2 bbis out the bit, SD pump and wait for 10 min then
work pipe w/o pump. Pump 2 bbls each 10 min then work pipe.
After OH full w/ 11 bbis, work to max of 90k and no
movement. Hold in tension for 30 min. Cycle occasionally w/
no movement. Stack at max wt for 30 min, then cycle to max
occassionally. Last try, go to max neg wt, pressure well to
1000 psi and pull to max of 90k. Hold for 1 min, then dump
pressure and came free. PUH while swap to pumping down
CT
16:30 - 18:00 1.50 P PROD1 Resume pumping 2.8/3460 while perform slow wiper to the
window while circ out crude
18:00 - 18:30 0.50 P PROD1 Log down for tie-in (+11ft).
18:30 - 19:20 0.83 P PROD1 Wiper to bottom. Slight motor work at 13400', work area. S-ow
running speed down & frequent pick up's past 13800' - clean.
19:20 - 20:35 1.25 P PROD1 Drill from 14010' 2.44l3450/60R w/ 400 psi diff, 1.0-2.Ok
DHWOB at 85 deg inc.
ECD = 10.21 PVT = 199bb1s. DHT = 182 deg. ST = 89 deg.
ROP = 30-130'/hr.
Drilled to 14094'
20:35 - 23:15 2.67 N STUC PROD1 Drilled off, stop drilling & PU. Can't PU, work pipe up mostly,
orientator moves freely - try 60 degrees either way, WOB
sensor shows almost max & min readings. Differentially stuck.
Stop pumping & let coil relax. Work pipe. Pressure up backside
& dump pressure while working pipe. Call for crude. Circulate
bottom's up & let coil sit - bottom's up revealed trace HOT in
sample. Work pipe occasionally, WOB sensor not showing
hardly any variations now - not differentially stuck?
Printed: 10/23/2007 3:00:05 PM
~
~
BP EXPLORATION Page 17 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30
Event Name: REENTER+COMPLET'E
Contractor Name; NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To Hours Task Code~ NPT
10/1/2007 23:15 - 23:25 0.17 N
23:25 - 00:00 0.58 N
10/2/2007 00:00 - 00:50 0.83 DRILL N
00:50 - 01:05 0.25 DRILL N
01:05 - 01:40 0.58 DRILL N
01:40 - 02:15 0.58 DRILL P
02:15 - 03:25 1.17 DRILL P
03:25 - 05:50 2.42 DRILL P
05:50 - 06:25 0.58 DRILL P
06:25 - 08:00 1.58 DRILL P
08:00 - 13:00 5.00 BOPSU P
13:00 - 15:35 2.58 DRILL P
~
15:35 - 16:15
0.67
BOPSU
P
16:15 - 18`.00 1.75 DRILL P
18:00 - 19:30 1.50 DRILL P
19:30 - 21:30 2.00 DRILL P
21:30 - 22:00 0.50 DRILL P
Spud Date: 4/11 /1995
Start: 8/7/2007 End:
Rig Release:
Rig Number:
Phase Qescription of Operations
PROD1 PJSM with LRS regarding crude handling & pumping.
PROD1 Spot LRS, get Reid vapor pressure rating = 0.5psi -good to go.
PROD1 Start pumping dead crude via LRS into the CT w/ 25 bbls of
7.21 ppg 86 deg crude at 2/2670. Use rig pump & start to
displace w/ mud at 2.0/2740 CTV=58
PROD1 Pump 10 bbls out of bit & wait.
PROD1 Work pipe, mostly upward. Circulate 2 bbls & wait. Work pipe
heavily in both directions, set injector brake & wait. Pump 2
more bbls out & tet soak for 30 min. Work pipe 90k up &-12k
down, setting injector brake each time. Work pipe 10k
increments to 90k & hold with injector brake. Try to orientate -
can with no problem. Orientate TF 180 degrees out from
current setting. RIH while holding new TF. Eureka! Popped free
while goin down. Whew! PU clean - 45k up, start pumping @
2.65bpm & orientate back to drilled TF setting. Circulate crude
out of coil.
PROD1 Tag bottom, clean PU. Wiper to window while chasing crude to
surface at 2.65bpm.
PROD1 RIH to fix corner on reel, when..... PU & started pulling heavy at
13460', 14k over pick up wt - 54k (both hyd & elec gauges), circ
pressure slowly increasing too - 200 psi (hyd & elec gauges).
Lower pump rate to 2.25bpm. Stop pumping & slowly pull BHA
through window, coil wt still at 52k. PU to 12800' & RIH, normal
RIW - 18k down. Stop & open EDC & compare pressures from
previous pumping w/ EDC open. Discuss pro's & cons for
pumping down coil while POH versus filling over top. Inspect
injector for visible defects, check gap in load cell - all good.
PROD1 Elect to POH to inspect BHA & perform weekly BOPE test.
Pump thru EDC while POH. Blow down MM - recovered 1 Ib of
coil shavings & chunks of aluminum.
PROD1 Stop @ 146' ct wt = 45001bs, stop pumping & flow check well.
Crew change/safety mtg
PROD1 Fin POOH and inspect CT for wear. Pipe and CTC look good.
Check for debris in lubricator/stack and all were clean. LD
drilling BHA. No marks other than normal. Bit was 1-1-I w/
open jets, motor was over-tite. Cut off CTC to rehead as
precaution. Function test rams looking for debris and were
clean
PROD1 BOPE test. The AOGCC waived their right to witness the test
PROD1 Cut off CTC & 15' of coil. Install new CTC & pull test to 35K -
good test. Rehead BHI connector & meg wire - good test. Test
connector & coil to 4000psi - good test. Change out CT
packoff's.
PROD1 Stab injector onto well. Pressure test CT packoff's & inner reel
vaNe per AOGCC regs.
PROD1 Pop off well. Install BHI double check valves. Meg wire - test
good. Open swab & fill hole - 3 bbls. Check chains - good. MU
bit to mud motor & put in well. Chage out dies in little tongs.
PROD1 Change out with day crew & PJSM regarding MU BHA.
PROD1 RIH with BHA #14 and 3-3/4" DS49
PROD1 At 12.850 conducted wt check of 43k up. SD pump and closed
EDC. RIH and log RA marker at 12,889 ft
Corrected -20 ft
Printed: 10/23/2007 3:00:05 PM
• ~
BP EXPLORATION Page 18 of 25
Opera~tions Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
10/2/2007 22:00 - 23:00 1.00 DRILL P PROD1 RIH, adjusted TF for OHST (13,000 ft)
RIH washing to bottom Qp = 2.62 bpm CTP = 3600 psi Wt
check at 13,956 ft= 43k up
Small amount of motor work and Wt ay 13600 ft Tagged at
14,093 ft
23:00 - 23:20 0.33 DRILL P PROD1 PUH, clean pick up off bottom, for wiper trip to confirm hote
integrity
23:20 - 23:45 0.42 DRILL P PROD1 Stopped at 13,550 ft, started new mud down CT and RIH to
drill
23:45 - 23:50 0.08 DRILL P PROD1 Tagged bottom at 14093 ft whi~e conduct mud swap.
Qp 2.6 bpm off bottom CTP = 3540 psi Delta P of BHA = 448
psi
Washing to bottom to get it to drill
23:50 - 00:00 0.17 DRI~L P PROD1 Drilling lateral TF at 45R HS
Qp = 2.62 / 2.60 bpm CTP 3622 psi
BHP 4860 psi ECD = 10.41 ppg
WOB / ROP = 1.40k1bf / 26 fph
10/3/2007 00:00 - 01:30 1.50 DRILL P PROD1 Drilling lateral TF at 45R to 65R HS
Qp = 2.61 / 2.60 bpm CTP 3100 psi
BHP 4820 psi ECD = 10.32 ppg
WOB / ROP = 1.68k1bf / 50-90 fph
Drilting good with the new mud Working out of Pits 2-3-5
Having stacking /slip stick issues with new mud in the hole.
01:30 - 03:30 2.00 DRILL P PROD1 Wiper trip to window Small amount of motor work and pulled
I ratty at 13,473 ft.
03:30 - 04:30 1.00 DRILL P PROD1 Drilling lateral TF at 70 R HS
Qp = 2.61 / 2.60 bpm CTP 3400 psi
, BHP 4820 psi ECD = 10.32 ppg
WOB / ROP = 2.78 klbf / 50-90 fph
Holes in good shape for the tractor trial. Mud swap completed.
Hole is not cleaning as well as it could even at 2.6 bpm,
increase Qp to 2.75 bpm 3620 psi. To much horizontal and 45
deg tangent sections
04:30 - 06:00 1.50 DRILL P PROD1 Wiper trip to base of whipstock
06:00 - 07:30 1.50 DRILL P PROD1 Drill lateral from 14195' with TF at 90 R HS
Qp = 2.69 / 2.62 bpm CTP 3815 psi
BHP 4837 psi ECD = 10.36 ppg
WOB / ROP = 1.5-2.5 klbf! 30-70 fph
DHT=176 deg ST=92 deg PVT=316
Drill to 14218'
07:30 - 08:35 1.08 DRILL P PROD1 Drilled off & started to stack wt. Wiper to base of whipstock
while pumping 2.7bpm. Clean PU of 42k off bottom.
08:35 - 09:30 0.92 DRILL P PR001 Open EDC & pump @ 2.85bpm while wipering to 10200' @
40ft/min inside 5-1/2" casing & 75ft/imn inside 4-1/2" tubing.
09:30 - 10:15 0.75 DRILL P PROD1 RIH pumping 2.85bpm @ 80ft/min from 10200'. Reduce rate @
12500'. Recovered an appreciable amount of cuttings during
wiper trip.
10:15 - 10:30 0.25 DRILL P PROD1 Stop pumping & close EDC. Log down for tie-in (+7ft corr).
10:30 - 11:40 1.17 DRILL P PROD1 Wiper to bottom, weight bobble at 13670' & 13690', 13740',
otherwise clean. 14.5k RIW.
11:40 - 12:20 0.67 DRILL P PROD1 Drill lateral from 14221' with TF at 100 R HS
Qp = 2.61 / 2.61 bpm CTP 3650 psi
BHP 4915 psi ECD = 10.53 ppg
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 19 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLEI"E Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Cod€: NPT Phase Description of Operations
10/3/2007 11:40 - 12:20 0.67 DRILL P PROD1 WOB / ROP = 1.5-2.5 klbf / 20-30 fph
12:20 - 13:15 I 0.921 DRILL I P I I PROD1
13:15 - 14:15 I 1.001 DRILL I P I I PROD1
14:15 - 14:35 I 0.331 DRILL I P I I PROD1
14:35 - 15:30 I 0.92I DRILL ~ P J ~ PROD1
15:30 - 16:40 I 1.171 DRILL I P I I PROD1
16:40 - 17:30 I 0.831 DRILL I P I I PROD1
17:30 - 18:05 I 0.581 DRILL I P I I PROD1
18:05 - 19:10 I 1.081 DRILL I P I I PROD1
19:10 - 22:15 I 3.08I DRILL I P I I PROD1
22:15 - 23:35 I 1.33I DRILL I P I I PROD1
23:35 - 00:00 0.42 DRILL P PROD1
10/4/2007 00:00 - 03:30 3.50 DRILL P PROD1
03:30 - 03:45 0.25 DRILL P PROD1
03:45 - 06:00 2.25 DRILL P PROD1
06:00 - 06:15 0.25 DRILL P PROD1
06:15 - 06:45 0.50 DRILL P PROD1
06:45 - 07:10 0.42 DRILL P PROD1
DHT=178 deg ST=95 deg PVT=299
Drill to 14243'
Drilled off & started to stack wt. PU 6k over. Wiper to window
while pumping 2.7bpm - clean.
Wiper to bottom, weight bobble at 73670' & 13690', 13740',
otherwise clean. 14.Ok RIW.
Drill lateral from 14245' with TF at 115 R HS
Qp = 2.42 / 2.36 bpm CTP 3650 psi
BHP 4906 psi ECD = 10.51 ppg
WOB / ROP = 1.5-3.0 klbf / 20-30 fph
DHT=178 deg ST=96 deg PVT=284
Drill to 14260'
Last sample shows trace pyrite {shublick). Start dropping
angle.
Drill lateral from 14260' with TF at 145 R HS
Qp = 2.60 / 2.62 bpm CTP 3650 psi
BHP 4898 psi ECD = 10.49 ppg
WOB / ROP = 1.5-3.0 klbf / 20-30 fph
DHT=180 deg ST=95 deg PVT=282
Drill to 14291'
Drilled off, CT wt wasn't stacking though. Clean PU. - 50'
drilled. Elect to wiper to window while pumping at 2.75bpm.
Motor work & CT wt at 13325'. Blow down MM.
PU inside casing while pumping through EDC. Fix minor leak
on pump #1. Blow air across kill line into choke line to blow
down return manifold. Continue to PU while jetting max rate.
Wiper to bottom pumping 2.7bpm. Close EDC at window.
Weight bobble at 13670' & 13690', 13740'.
Drill lateral from 14289' with TF at 90 R HS
Qp = 2.61 / 2.57 bpm CTP 3850 psi
BHP 4998 psi ECD = 10.67 ppg
WOB / ROP = 1.5-3.0 klbf / 20-70 fph
DHT=180 deg ST=96 deg PVT=264 bbl
CTP at 4100 psi with 2,6 bpm Flowrate, not much room for error
for drilling CTP . Res curve shows we ar back in the Sublick
Wiper trip talked to Asset about present drilling and geological
Pulled above WS, open EDC, PUH to 10,200 ft to clean out
cuttings. RIH at 110 fph claening out tubing. Closed EDC at
12850 ft. Logged tie +6 ft
RIH to tag bottom and confirm PBTD Seen motor stall at
13,333 ft, PU and lower Qp went through Small hot shale. RIH
Pumped 50 bbl 120k LSRV liner pill down CT. Tagged at
14,320 ft TD r-
POOH laying in 120k LSRV liner pill
POOH to PU and conduct trail run on WWT tractor
Held PJSM on LD BHA
LD drilling BHA. Held PJSM on PU and RIH with WWT. PU
tractor BHA
Change out night crew & PJSM regarding PU tractor BHA.
PU BHI tools & stab onto WWT SHA. PU & MU coil to BHA.
i Stab injector onto well. Test BHI tools good test.
I RIH with tractor & BHI BHA.
Printed: 10l23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 20 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30
Event Name: REENTER+COMPLET'E
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To I Hours 1 Task I Code~ ~ NPT
10/4/2007 ~ 07:10 - 09:10 I 2.00 I DRILL ~ P
09:10 - 09:25 0.25 DRILL P
09:25 - 09:35 0.17 DRILL P
09:35 - 11:15 1.67 DRILL P
11:15 - 13:45 2.50 DRILL P
13:45 - 14:00 0.25 DRILL P
14:00 - 15:00 1.00 DR~LL P
15:00 - 16:18 I 1.30 DRILL I P
16:18 - 18:30 2.20 DRILL P
18:30 - 19:00 0.50 DRILL P
19:00 - 21:00 2.00 CASE P
21:00 - 00:00 3.00 CASE P
10/5/2007 00:00 - 02:00 2.00 CASE P
02:00 - 04:15 I 2.251 CASE I P
04:15 - 06:00 I 1.751 CASE I P
06:1~5 - 07:00 I 0.75I CASE I P
07:00 - 08:00 I 1.00 I CASE I P
08:00 - 09:25 I 1.42I RIGD I P
09:25 - 09:40 0.25 RIGD P
09:40 - 10:40 1.00 RIGD P
10:40 - 12:15 1.58 RIGD P
12:15 - 02:35 I 14.33I RIGD I P
02;35 - 02:45 0.17I RIGD P
02:45 - 03:30 0.75 RIGD P
03:30 - 04:15 0.75 RIGD P
04:15 - 18:15 14.00 RIGD P
18:15 - 18:35 0.33 RIGD P
18:35 - 20:40 2.08 RIGD P
20:40 - 23:40 I 3.001 RIGD I P
Spud Date: 4/11/1995
Start: 8/7/2007 End:
Rig Release:
Rig Number:
Phase Description of Operations
PROD1 RIH to 800ft & begin testing tractor BHA. Verify tool is On and
or Off; Dead pull test. Walk tractor up & down hole upto
10ff/min with varing different pump speeds. While walking ,
orientated TF with tractor on & off. Repeat & compare results.
PROD1 POH.
PROD1 PJSM regarding handling BHA
PROD1 MU 0.8 AKO motor w/ HYC PDC bit. MU BHI tools to motor &
place in well. Stab coil onto tools. Stab injector onto well.
Power up & test tools - good. Open EDC & RIH.
PROD1 Open EDC & pump while RIH.
PROD1 Log down for corr from 12900' (-23ft corr).
PROD1 Wiper to bottom. Large weight bobbles at 13670' & 13690',
13740', otherwise clean. Start pumping 100k LSRV liner pill at
13775'. Tag bottom at 14320' & start laying in liner pill.
PROD1 Open EDC @ 12860' & pump max rate while POH.
PROD1 Paint flag (brilliant yellow) at 11600' (going down) for reference
and or confusion. Continue POH.
PROD1 LD Drilling BHA following PJSM
RUNPRD PJSM on RU to run liner RU to run liner
RUNPRD Run liner as per Data Base Summary
RUNPRD Running liner as per Data Sase liner Summary. PU BHI's
CoilTrac System. Stab on injector
RUNPRD Set counters to 1857.75 ft and RIH
Wt check at 12,800 ft= 45k
Tagged at 14,342 ft, minus the 22 ft corzection = 14,320 ft
RUNPRD At Qp = 2.5 bpm PU on string and lost 5 klb. POOH to swap
reels.
RUNPRD Change out with night crew & PJSM.
RUNPRD Continue to POH. PJSM while POH regarding laying down
BHA.
RUNPRD Tag up. Flow check well - no flow. Pop off well. Break off coil
from BHA & place injector over bung hole to circulate. LD
drilling BHA.
RUNPRD Circulate water & corrosion inhibitor in reel. Pump 10 bbls of
meth. RU SLB N2 unit & cool down same.
RUNPRD PJSM regarding blowdown of reel.
RUNPRD Blow down reel with N2. Let coil bleed off.
RUNPRD Pop off well. Break off BHI head. Cut off CTC. Dress inside of
coil for grapple connector.
RUNPRD Unstab injector & pull coil across into reel house. Install
shipping bar & secure coil. RU lifting shackles to pad eyes on
reel. RD 2" hardline.
RUNPRD PJSM regarding dropping e-reel & picking up e-free reel.
RUNPRD Open bombay doors. Unpin reel. Cut 3' off coil to clear door.
Lower reel down to trailer.
RUNPRD PU new e-free coil from trailer.
RUNPRD Prep end of coil for grapple connector.
RUNPRD Held PJSM on pulling coiled tubing across
RUNPRD Pull test cable and CT grapple and tighten. Pull CT across
pipe shed RU hardline and install BOT CTC
RUNPRD Pull test CTC to 40 k. Loaded dart catcher and stabbed on
well. Pumped 5 bbl MEOH and 5 bbl water followed by
Flo-Pro. PT hardline to 4000 psi. launch dart and displace to
Printed: 70/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 21 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLEI"E Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code: NPT `Phase Description of Qperations
10/5/2007 20:40 - 23:40 3.00 RIGD P RUNPRD dart catcher. Vol = 60.6 bbls Recovered dart and reloaded to
test again. Vol = 60.3 bbl.
23:40 - 00:00 0.33 CEMT P RUNPRD PU Cement BHA with BOT and 2 jts of 2-3/8" PH6
10/6/2007 00:00 - 00:30 0.50 CEMT P RUNPRD Finished PU BOT Cement BHA
00:30 - 01:00 0.50 CEMT P RUNPRD RIH to 139 ft and acts like we are hiting someth, taking some
weight. Stop and PUH to look at BOT stinger
, 01:00 - 01:20 0.33 CEMT P RUNPRD Set back injector and pull BHA from well and look at stinger
Stinger looks good, Stab back in the well and stab on injector
01:20 - 04:30 3.17 CEMT P RUNPRD RIH with cement stinger Wt check at 12,450 ft= 41k1b Tagged
Deployment sleeve at 12515 ft and set down at 12520 ft. PU
' and have Iliner. RIH and located ball drop location Bleed
pressure off. Break circulation and check flowrates ratio. at 1:1
SD and dropped 5/8" ball
04:30 - 05:10 0.67 CEMT P RUNPRD Circulated AI ball down to disconnect from liner at 57.3 bbl
Released at 4750 psi PU wt 33k, set 10k
05:10 - 06:00 0.83 CEMT P RUNPRD Displace welibore to 2% KCL
Qp = 2.50 / 2.30 bpm RU cementers
06:00 - 06:15 0.25 CEMT P RUNPRD Change out with day crew. PJSM.
06:15 - 07:00 0.75 CEMT P RUNPRD Continue to displace wellbore to 2% slick KCL
Qp = 2.64 / 2.5 bpm.
07:00 - 09:00 2.00 CEMT P RUNPRD Clean KCL returns at surface. Continue to circulate. CT
pressure has stabalized at 1090 psi. Continue to clean pits &
off load KCL to rig. Mix up -- 40 bbls of Bio. Release 2 vac
trucks to make room for SLB cementers.
09:00 - 09:30 0.50 CEMT P RUNPRD PJSM with crew regarding cement operations.
09:30 - 10:15 0.75 CEMT P RUNPRD Shuffle SLB bulk truck into place. Rig up fresh water hose from
rig to SLB cementers. SLB's priming up & batching up. Cement
is upto weight 15.80 ppg at 10:OOam with 4hrs thickening time.
10:15 - 10:25 0.17 CEMT P RUNPRD Pump 5 bbls of bio with rig pump to fil! pump lines upto reel
hardline. SD rig pump & isolate lines. Line up cementers to
pump fresh water to fill lines into reel. Pumped 3 bbls of fresh
water, SD & P.T. lines to 4000psi.
10:25 - 10:35 0.17 CEMT P RUNPRD Start um in cement, zero when 11 ppg at MM. Pumped 23.2
bbls of 16.10 ppg class'G' cement, 2.35bpm @ 2200psi.
10:35 - 10:45 0.17 CEMT P RUNPRD Stop pumping, isolate reel & clean up cement lines with biozan
& vac ouY. Load Pee Wee dart into coil past tee.
10:45 - 11:05 0.33 CEMT P RUNPRD Zero in MM & pressure up & launch dart with biozan @ 3bpm.
Pumped 41.5bbls of 1.5ppb Biozan. Swap to KCL.
11:05 - 11:10 0.08 CEMT P RUNPRD Zero ouf MM when 49.6 bbls on the in MM.
11:10 - 11:15 0.08 CEMT P RUNPRD 59 bbls away, reduce pump rate to 0.5 bpm. Pee Wee dart
landed at 61.1 bbls, sheared at 3500psi.
11:15 - 11:20 0.08 CEMT P RUNPRD Increase pump rate to 2.5bpm.
11:20 - 11:25 0.08 CEMT P RUNPRD 71.5 bbls away, reduce pump rate to 1 bpm.
11:25 - 11:30 0.08 CEMT P RUNPRD LWP landed at 72.7 bbls on in MM, 22.2 bbls on out MM
(22.2bbls behind pipe). Pressure up to 2200 psi & hold for 2
min - flat lined. Open Baker choke & test floats - no returns,
floats holding. Close Baker choke & pressure up to 500psi. PU
coil (42K up wt). Text book job. Thanks for the help Dave!
11:30 - 14:00 2.50 CEMT P RUNPRD POH pumping coil displacement only.
14:00 - 17:00 3.00 CEMT P RUNPRD Tag up. Flow check well for 15 min - no flow. PJSM & pop off
well. Break off BHA. Coil connector had minor amount of
cement on it. Put injector over bung hole to circulate. Service
break Baker BHA & send down beaver slide. send BOT tool
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page.22 of.25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLEI"E Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task CodE: NPT Phase Description of OperatiQns
10/6/2007 14:00 - 17:00 3.00 CEMT P RUNPRD basket down beaver slide. Hose blew on little jerk tongs, drive
to local hardware store for new fittings & hose. PJSM with SLB
& bring SLB memory tools to rig floor. Rebuild little jerk tongs.
PJSM & clean out rock catcher on hardline manifold.
17:00 - 20:30 3.50 RIGU P LOWER1 PJSM & start making up FCO / logging BHA. Recovered debris
(large rocks & gravel & wire) from top of SLB carrier sub.
20:30 - 22:06 1.60 RIGU P LOWER1 RIH with FCO MCCL/GR to 11098 ft
22:06 - 23:00 0.90 RIGU P LOWER1 RIH logging at 30 fpm Qp = 1.5 bpm Tagged at 12,284 ft inside
5-1/2" casing with motor work. Unable to get past 12,284
Motor stall and pulled tight Called for big tools
23:00 - 00:00 1.00 RIGU N CEMT ~OWER1 POOH
10/7/2007 00:00 - 01:08 1.13 EVAL N CEMT LOWER1 POOH
01:08 - 02:15 1.12 EVAL N CEMT LOWER1 Unstabbed injector, Install new CTC, pulled and pressured
tested. Dropped 1/2" ball and open CS in 1-1/4" string.
Brought in BOT tool string
02:15 - 03:30 1.25 EVAL N CEMT LOWER1 POOH standing 1-1/4" CSH in derrick. SLB checking nitrogen
charge on their injector accumulators
03:30 - 04:00 0.50 EVAL N CEMT LOWER1 PU BOT tools. While breaking out cement mil, Little Jerks hose
ruptured, SD hydraulic.
04:00 - 06:00 2.00 EVAL N RREP LOWER1 Wait on parts / hose for Little Jerks from Brooks Range. Down
loaded Memory data and determined tag was 12,253 ft
corrected ( PerF Area). Recovered 1/2" ball from cire sub.
06:00 - 06:15 0.25 EVAL N CEMT LOWER1 Change out with day crew & PJSM regarding BHA handling.
06:15 - 09:00 2.75 EVAL N CEMT LOWER1 RIH with under reamer BHA. Begin adding citrix acid to lower
PH of fluid in pits. Begin adding biozan to active system & bring
it up to 2 ppb Bio.
09:00 - 09:25 0.42 EVAL N CEMT LOWER1 Tag up twice at 12041' corrected. PU coil & start pumping Bio
down coil (slick KCL + 2ppb Bio). Back ream section. 42k up
, ~.
I Qp = 2.3 / 2.31 bpm CTP 1477 psi
ROP = 20 fph
PVT=358
09:25 - 09:40 0.25 EVAL N CEMT LOWER1 Stop back reeming at 11790'. RIH & under ream from 11790'.
RIH wt 19.5k.
' Qp = 2.3 / 2.38 bpm CTP 1575 psi
ROP = 20 fph
PVT=358
09:40 - 11:00 1.33 EVAL N CEMT LOWER1 Continue to under ream. Limit ROP to 5'/min. Stall at 12029'.
Stall at 12043'. Stall at 12052'. Bottom's up reveled cement &
lots of it & was grey in color. Limit ROP to 2.5'/min. Stall at
12064'. Limit ROP to 25'/HR. Divert 35 bbls to cutting box& add
citrix acid to neutralize.
11:00 - 12:00 1.00 EVAL N CEMT LOWER1 Under ream from 12075'
Increase ROP to 1-2'/min.
Qp = 2.4 / 2.4 bpm CTP 2200 psi
ROP = 75 fph
PVT=323
Under reamed to 12175' and stalled (start of another set
perForations).
12:00 - 13:10 1.17 EVAL N CEMT LOWERI Under ream from 12175'
Qp = 2.3 / 2.3 bpm CTP 1975 psi
ROP = 10-50 fph
PVT=318
Printed: 10/23/2007 3:00:05 PM
~ ~
BP EXPLORATION Page 23 of 25
~perations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
bate From - To Hours Task Code NPT Phase Description of Qperations
10/7/2007 12:00 - 13:10 1.17 EVAL N CEMT LOWER1 Stalled at 12180',12189',12198',12204'
Under reamed to 12204'.
13:10 - 13;20 0.17 EVAL N CEMT LOWER1 PU 100' & RIH to bottom.
13:20 - 15:30 2.17 EVAL N CEMT LOWER1 Under ream from 12204'
Qp = 2.43 / 2.44 bpm CTP 1934 psi
ROP = 10-20 fph
PVT=313
Stalled at 12208',12214,12220',12227', 12230' ,
Under reamed to 12230'.
15:30 - 20:00 4.50 EVAL N CEMT LOWER1 Due to low ROP & high footage under reaming (+200'), elect to
POH, inspect BHA & to PU different BHA. 48k off bottom.
Backream up at 25'/min to 11500' & ream down to get bottom's
up. POH to 11500' pumping down coil, then fill across the top
from there. can't make it past 11300'. RIH & drop 3/4" ball to
open cire sub. red~ce pumps @ 50 bbls away. Stop pumping,
rock pumps. Didn't see ball hit, but circ pressures are lower.
POH. No motor work through tail pipe - cire sub must be open.
20:00 - 21:15 1.25 EVAL N CEMT LOWER1 SD at 200 ft and PUH inspecting top 200 ft of CT in the Cr
tubing
Pull BHA out hole. CS open, recovered all arms on UR. PU
3.78 string mill and parabolic DSM
Change packoffs
21:15 - 23:25 2.17 EVAL N CEMT LOWER1 RIH Inc Qp to 2.8 bpm while RIH. CTP 2281 psi at 2.80 bpm
23:25 - 23:50 0.42 EVAL N CEMT LOWER1 Washing down through per area at 5 to 15 fpm from 11,600 ft
QP = 2.8 / 2-9 bpm
CTP = 2260 psi
Seen a little WOB at 12,120 ft and deeper Corrected -20 ft at
12,200 ft Started to see more WOB at 12, 180 ft 100 ft
wiper, PUW = 45.5 klb up at 15.6 fpm
23:50 - 00:00 0.17 EVAL N CEMT LOWER1
10/8/2007 00:00 - 00:15 0.25 EVAL N CEMT LOWER1
00:15 - 02:50 2.58 EVAL N CEMT LOWER1
02:50 - 04:30 1.67 EVAL N CEMT LOWER1
04:30 - 05:05 0.58 EVAL N CEMT LOWER1
05:05 - 06:00 0.92 EVAL N CEMT LOWER1
06:00 - 08:00 2.00 EVAL N CEMT LOWER1
1st motor work at 12,240 ft ROP 200 fph at 250 Ib WOB
Hard cement at 12,249 ft Milling up cement 1500 Ib WOB with
100 psi motor work. ROP at 0.8 fpm
At 12280 ft ROP picked up to 3 fpm with 1200 Ib WOB 60 psi
motor work
Cleand out to 12,300 ft< PU to 12, 250 ft and clean. RIH
Wiper to 12,300 ft to 12, 250 ft clean RtH, milling up cemen
Qp = 2.80 bpm at 2271 psi (40 psi over). Real hard cemennt at
12,338 ft WOB at 2200 Ibf
Milling up cenment at 30 fph w/ 2100 Ibf WOB and Qp = 2.83
bpm
Wiper trip at 12,400 ft to 12,283 ft RIH and got something
beside us, PUH to 12,240 ft RIH clean to12,400 ft.
Milling cement Qp 2.85 bpm at 2325 / 2430 psi ROP = 30 fph
After 12,420 ft, no cement has been seen till 12,488 ft.
Cleaned out to 12, 488 ft and seen the deployment sleeve with
an increase in motor work.
PUH to wash and ream the section again RIH to 12,488 ft no
indication of cement.
PUH to 12, 200 ft and dropped 3/4" ball. Open CS, POOH
chasing cement residue to surface. Pulled tight at 11,473 ft("X"
nipple) Worked through POOH
Change out with night crew & PJSM. Continue to POH, PJSM
P~intetl: 10/23/2007 3:00:05 PM
~ •
BP EXPLORATION Page 24 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To l Hours ~ Task I Code ( NPT Phase Description of Operations
10/8/2007 I 08:00 - 08:45 0.~75 EVAL I N
08:45 - 11:00 2.25 EVAL N
11:00 - 11:50 0.83 EVAL N
11:50 - 14:30 I 2.671 EVAL I N
14:30 - 17:00 I 2.501 EVAL I P
17:00 - 18:30 1.50 EVAL P
18:30 - 19:25 0.92 EVAL P
19:25 - 21:00 I 1.581 EVAL I N
21:00 - 22:05 I 1.081 EVAL I P
22:05 - 23:00 0.92 EVAL P
23:00 - 23:50 0.83 EVAL P
23:50 - 00:00 0.17 EVAL P
10/9/2007 00:00 - 00:30 0.50 EVAL P
00:30 - 01:35 1.08 EVAL P
01:35 - 03:35 I 2.001 EVAL I P
03:35 - 05:30 I 1.921 EVAL I P
05:30 - 08:30 3.00 EVAL N
08:30 - 11:35 3.08 EVAL P
11:35 - 02:30 14.92 PERFO P
02:30 - 15:47 I 13.28I PERFOBI P
CEMT LOWER1 while POH regarding BHA handling.
CEMT LOWER1 Change out BHA.Recovered 3/4" ball. Install new motor &
polish mill.
CEMT LOWER1 RIH with polishing miil.
CEMT LOWER1 Make -20ft correction, 45k up wt. Dry tag at 12500'. Start
pumping at 2.5 bpm. 8egin polishing @ 40'lhr. Tag up at
12503.5' & stalled. 10k overpull. Sit at 12506.4' ct wt = 6k. PU
(clean PU) & repeat. Sit at 12507.9' ct wt = 4k. PU (clean PU)
& repeat - same depth. PU (clean PU) & drt tag - 12506'.
CEMT LOWER1 POH while pumping 2.71bpm. PJSM while POH regarding BHA
handling.
LOWER1 Pop off well & place injector over bung hole to circulate. Break
off BHA, visible metal scaring on cut-rite located on no-go
(shouldered out on top of liner). LD BOT BHA to ground. PU
FCO / logging BHA. PU injector & MU to BHA. Stab injector
onto well. Set counters.
LOWER1 RIH with logging/FCO BHA.
LOWER1 Logging down at 30 fpm from 11,100 ft to 12, 532 ft Tagged
inside the liner at 12,532 ft uncorrected
CEMT LOWER1 Drill cement from 12,532 ft ft 100 psi motor work ROP 25 fpm
Qp= 1.58 bpm and 2,087 psi free spin
Drilling cement at 150 psi motor work at 20-74 fpm At 12,607 ft
lost motor differential with 2000 Ibf of CT wt broke through
cement. Transitation zone between Cement and welibore
fluids.
PUH to 12,600 ft.
LOWER1 Logging down at 30 fpm from 12,600 ft Seen a little WOB at
13,370 ft, 13478 ft while logging down at 30 fpm. Tagged at
14,295 ft
LOWER1 PUH at 60 fpm (CT'W = 51k)
LOWER1 RIH to lay in 150k LSRV Perf pifl
LOWER1 POOH laying in perf pill.
LOWER1 PUH to 11880 ft and dropped 1/2" ball to open CS
LOWER1 Circulate 1/2" ball down CT using clean 2% KCL Hauling 200
bbl of +2 ppb of bio water to G&I
Open CS at 2900 psi, pumped 10 bbl KCL
LOWER1 POOH chasing Biozan to surface at 2.6 bpm & 4000 psi
Held PJSM on BHA handling
LOWER1 Unstab injector artd PUH stand+ng 1-1/4" CSH in the derrick.
LD logging tool and confirm data . LD Motor and Mill.
Confirmed data is valid. Send log file to town for TOL and
PBTD numbers. Function test BOP's.
LOWER1 Confirm PBTD is correct & verify with town prior to PU guns.
LOWER1 PU perf BHA.
LOWER1 RIH with perf BHA. Tag twice at 14294', ct wt=48k up. Tag
again, PU to get coil wt & correct depth to 14285', Hold
discussion with SLB gun runners for perforating. SLB gun
runners called SLB management for verification. Place reel in
ball drop position. Pump 10 bbls of biozan, then 1/2" aluminum
ball, then 10 bbls of biozan, remainder 2% KCL.
LOWER1 Dropped 1/2" ball and dispiaced to firing Pumped 67 bbl and
had to rock the pumps to get the guns to fir. Rocked and
pressure increase to 1250 psi and fell off 300 psi, Checked
Printed: 10/23/2007 3:00:05 PM
• i
BP EXPLORATION Page 25 of 25
Operations Summary Report
Legal Well Name: X-30
Common Well Name: X-30 Spud Date: 4/11/1995
Event Name: REENTER+COMPLETE Start: 8/7/2007 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Nours Task Code NPT Phase' Description of Operations
10/9/2007 02:30 - 15:47 13.28 PERFO P LOWER1 circulation and confirmed the loss of 250 psi.
15:47 - 19:00 3.22 PERFO P LOWER1 POOH filling across the top Stopped at TOL at 12,500 ft and
checked for flow OK
19:00 - 21:00 2.00 PERFO P LOWER1 Hold PJSM. Stand back CSH in derrick.
21:00 - 23:00 2.00 PERFO P LOWERI Hold PJSM with SWS and rig crew. Discuss hadling guns and
possible hazards.
Recover ball. Lay down 43 guns and one blank. All shots
fired.
23:00 - 23:45 0.75 PERFO P LOWER1 Bundle guns in pipe shed and allow them to drain.
23:45 - 00:00 0.25 PERFO P LOWER1 Run in hole with CSH.
10/10/2007 00:00 - 03:00 3,00 PERFO P LOWER1 Continue to run in hole with CSH pipe. POOH and LD same in
pipe shed. Unload pipe shed.
03:00 - 07:10 4.17 WHSUR P POST Hold PJSM. Rig up LRS pump truck. Run in hole with nozzle
to 2000'. Pumped 60 bbl of diesel and POOH laying in say.
07:10 - 08:00 0.83 WHSUR P POST Pump Water followed by MEOH to prep the CT for storage
08:00 - 13:00 5.00 WHSUR P POST Blowed down CT with N2 and pulled CT across pipe shed and
secured on reel. Valve shope installed BPV in well as per
SOP's
13:00 - 13:30 0.50 WHSUR P POST Held PJSM on ND BOP, discussed hazards and issues
13:30 - 17:00 3.50 RIGD P POST ND BOP's and made ready to move off well
17:00 - 18:00 1.00 DEMOB P POST Move off well
Rig Released at 18:00 hrs
Nnntea: ~az3i20oi 3:uu:ubrna
~
~
bp BP Alaska ~~
~ Baker Hughes INTEQ Survey Report INTE
Q
Compaey: BP Amoco ' Dste: 10/4/2~7 Time: 09:12;Q3 Fage: 1
Field: Pntdhce Bay Co-ordiaate(NE) Refereece: We1L X-30. True North
Site: PB X Pad VerHcal (TVD) RePere~ce; 40 ; 30 4/11/1995 OQ:00 7Q.1
Well: X-30 SecHon (VS) Refereocr. Site (-2126.61N,-40E1.89E,167.65Azi)
Wellpat6: X-30APB1 Sarvey Cakulation Met6od: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zoue: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagoetic Model: bggm2007
Site: PB X Pad
TR-10-14
UNITED STATES : North Slope
Site Position: Northing: 5937417.97 ft L.atitude: 70 14 7.207 N
From: Map EasNng: 664667.65 ft Longitude: 148 40 13.706 W
Position Uncertainty: 0.00 ft North Reference: True
Groand Level: 0.00 ft Grid Convergence: 1.25 deg
Well: X-30 Slot Name: 30
Weli Positioo: +N/-S 2126.61 ft Nort6ing: 5939552.68 ft Latitude: 70 14 28.122 N
+E/-W 400.89 ft Easting : 665021.98 ft Longitude: 148 40 2.052 W
Position Uncertainty: 0.00 ft
Wellpath: X-30AP61 Drilled From: X-30
50-029-22550-71-00 Tie-onDepth: 12861.00 ft
Current Datum: 40 : 30 4/11 /1995 00:00 Height 70.10 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/15/2007 DeclinaHon: 23.82 deg
Fieid Strengt6: 57662 nT Mag Dip Angle: 80.91 deg
Vertical Section: Dept6 From (TVD) +N/-S +E/-W Direction
ft ft ft deg
32.10 -2126.61 -400.89 167.65
Sarvey Program for Definitive Wellpath
Date: 9/20/2007 Validated: No Version: 2
Actaal From To Survey Toolcode Tool Name
ft ft
200.00 11568.00 1: MWD - Standard (200.00-121 MWD MWD - Standard
11627.00 12861.00 1: MWD - Standard (11627.00-1 MWD MWD - Standard
12880.00 13741.25 MWD (12880.00-13741.25) MWD MWD - Standard
Aenotation
NID TVD
ft ft
12861.00 9041.44 TIP
12880.00 9042.84 KOP
13741.25 9028.06 TD
Survey: MWD Start Date: 9/24/2007
Company: Baker Hughes INTEQ Engineer:
Tooi: MWD;MWD - Standard Tied-to: From: Definitive Path
• •
bp BP Alaska ~~$
~ Baker Hughes INTEQ Survey Report LNTE
Q
Cowpany: BP Amoco Date: 10/4/?007 Tune: 09:?2;03 Page: 3
FieNl: Prudhoe Bay Co-ordinAte(NE) Refereace: Well: X-30, True North
Site: PB X Patl Verti~l ('fVD) Reference: 40 : 30 4111/1895 00:00 701
Well: X-30 Section(VS)Reference: Site(-2126.6 1N,-400.89E,t67.65Azi)
Wellpath: X-30APB1 Snrvey Caka~doa Metiod: . Minimum Curvature Db: Orade
Survey
MD tocl Azim TVD Sys TVD N!S FJW MapN MApE VS DLS Tool
ft deg deg ft ft ft ft ft ft it deg/100ft `
12861.00 85.80 186.40 9041.44 8971.34 -7841.85 650.04 5931727.47 665843.48 5807.77 0.00 MWD
12880.00 85.80 186.87 9042.84 8972.74 -7860.68 647.85 5931708.61 665841.70 5825.69 2.47 MWD
12906.77 86.56 185.35 9044.62 8974.52 -7887.23 645.01 5931681.99 665839.44 5851.02 6.34 MWD
12946.45 85.88 183.07 9047.23 8977.13 -7926.72 642.10 5931642.46 665837.40 5888.97 5.98 MWD
12976.68 89.57 181.34 9048.43 8978.33 -7956.90 640.94 5931612.27 665836.90 5918.20 13.48 MWD
13011.99 93.41 175.65 9047.52 8977.42 -7992.16 641.87 5931577.03 665838.60 5952.85 19.43 MWD
13044.16 94.77 776.85 9045.22 8975.12 -8024.18 643.97 5931545.07 665841.39 5984.58 5.63 MWD
13085.07 92.55 171.70 9042.61 8972.51 -8064.78 648.04 5931504.56 665846.35 6025.12 13.68 MWD
13119.67 91.87 168.60 9041.27 8971.17 -8098.85 653.95 5931470.64 665853.01 6059.65 9.17 MWD
13149.62 91.50 167.45 9040.39 8970.29 -8128.13 660.17 5931441.50 665859.86 6089.59 4.03 MWD
13182.10 90.09 166.50 9039.94 8969.84 -8159.77 667.49 5931410.03 665867.87 6122.06 5.23 MWD
13214.81 90.64 162.53 9039.73 8969.63 -8191.29 676.22 5931378.72 665877.29 6154.71 12.25 MWD
13246.61 90.46 159.74 9039.43 8969.33 -8221.37 686.50 5931348.87 665888.23 6186.30 8.79 MWD
13278.79 90.49 156.47 9039.16 8969.06 -8251.23 698.50 5931319.28 665900.88 6218.03 10.16 MWD
13309.63 89.54 154.06 9039.15 8969.05 -8279.24 711.40 5931291.57 665914.39 6248.15 8.40 MWD
13344.01 90.74 151.00 9039.07 8968.97 -8309.73 727.25 5931261.42 665930.91 6281.34 9.56 MVW
13377.38 90.80 147.11 9038.62 8968.52 -8338.35 744.41 5931233.20 665948.68 6312.96 11.66 MWD
13408.45 87.55 146.24 9039.07 8968.97 -8364.30 761.47 5931207.62 665966.31 6341.96 10.83 MWD
13438.19 89.69 143.65 9039.78 8969.68 -8388.64 778.55 5931183.67 665983.91 6369.38 11.29 MWD
13470.96 91.17 139.65 9039.54 8969.44 -8414.33 798.88 5931158.43 666004.80 6398.83 13.01 MWD
13501.54 91.20 136.58 9038.91 8968.81 -8437.09 819.29 5931136.13 666025.70 6425.43 10.04 MWD
13530.71 92.85 133.60 9037.88 8967.78 -8457.73 839.86 5931115.94 666046.72 6449.99 11.67 MWD
13559.47 91.93 131.02 9036.68 8966.58 -8477.07 861.11 5931097.07 666068.38 6473.43 9.52 MWD
13590.01 92.82 128.52 9035.41 8965.31 -8496.59 884.56 5931078.07 666092.26 6497.51 8.68 MWD
13620.39 93.26 125.89 9033.80 8963.70 -8514.93 908.72 5931060.26 666116.81 6520.60 8.77 MWD
13650.58 92.95 122.34 9032.16 8962.06 -8531.84 933.68 5931043.91 666142.13 6542.45 11.79 MWD
13680.96 92.52 120.42 9030.71 8960.61 -8547.64 959.58 5931028.68 666168.37 6563.42 6.47 MWD
13741.25 92.52 120.42 9028.06 8957.96 -8578.13 1011.52 5930999.33 666220.96 6604.32 0.00 MWD
i •
bp BP Alaska ~~
~ Baker Hughes INTEQ Survey Report ~r,TE
Q
CompaAy: $P Amoco Date: 10/4/2007 Time: 09:13;49 Page: 1
FtieM: ' Prudhoe Bay Go-ordieAte(NE) Refercnce: Well: X-30. True North
Site: PB X Pad Verheal (TVD} Reterence: 40 t 30 M11/1995 00:00 70.1
Well: X-30' Sectioo (VS) Refcrencet WeiF (O.OON-0,OOE,t74.13Azi)
Weilpath: X-30APB2 Sarvey CalcaiatioaMethod: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: P8 X Pad
TR-10-14
UNITED STATES : North Slope
Site Position: Nort6ing: 5937417.97 ft L.atitode: 70 14 7.207 N
From: Map Easting: 664667.65 ft L.ongitude: 148 40 13.706 W
Position Uncertainty: 0.00 ft Nort6 Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.25 deg
Weli: X-30 Slot Name: 30
Well Position: +N/-S 2126.61 ft Northing: 5939552.68 ft L~titnde: 70 14 28.122 N
+E/-W 400.89 ft Easting : 665021.98 ft Longitude: 148 40 2.052 W
Positioa Uncertainty: 0.00 ft
Wellpath: X-30APB2 Drilled From: X-30APB1
50-029-22550-72-00 Tio-on Dept6: 13438.19 ft
Cnrrent Datum: 40 : 30 4/11/1995 00:00 Heig6t 70.10 ft Above System Datum: Mean Sea Level
Magnetic Data: 9/26/2007 Declination: 23.57 deg
Field Strength: 57654 nT Mag Dip Angle: 80.87 deg
Vertical Secfion: Depth From (TVD) +N/S +E/-W Direction
ft ft ft deg
32.10 0.00 0.00 174.13
Survey Program for Definitive Wellpath
Date: 9/26/2007 Validated: No Version: 1
Actual From To Survey Toolcode Tool Name
ft ft
200.00 11568.00 1: MWD - Standard (200.00-121 MWD MWD - Standard
11627.00 12861.00 1: MWD - StandaM (11627.00-1 MWD MWD - Standard
12880.00 13438.19 MWD (12880.00-13741.25) (2) MWD MWD - Standard
13448.00 13590.00 MWD (13448.00-13590.00) MWD MWD - Standard
Annotation
MD TVD
ft ft
13438.19 9039.78 TIP
13448.00 9039.80 KOP
13590.00 9043.80 TD
Survey: MWD Start Date: 9/26/2007
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD - Standard Tied-to: From: Definitive Path
~ i
bp BP Alaska ~$
~ Baker Hughes INTEQ Survey Report 1NTE
Q
Company: BP Amoco Date: 10/4/2007 Time: Q9:13;49 PAgc: 2
Fietd: Prudhoe Bay Co-ordisatetNE) Reference: Well: X-30, True North '
Site: PB X Pad Vertic~l (1'VD) Reference: 40 : 30 4J11/1995 D0:00 70.1
We1L• X-30 Sectioo (VS) Referencec We1C (O.OON,O.OOE,174. 13Azi)
Welipath: X-30APB2 Sarvey Calcelation Met6od: Minimum Curveture Db: Oracle
Survey
MD Incl Azim TVD Sys TVD N/S E/W MapN MapE VS DIS Tool
ft deg deg ft ft ft tt ft ft ft deg/104ft
13438.19 89.69 143.65 9039.78 8969.68 -8388.64 778.55 5931183.67 665983.91 8424.28 0.00 MWD
13448.00 90.13 142.45 9039.80 8969.70 -8396.48 784.45 5931175.96 665989.98 8432.68 13.03 MWD
13479.95 85.98 139.39 9040.88 8970.78 -8421.26 804.57 5931151.63 666010.64 8459.39 16.13 MWD
13507.88 87.21 140.51 9042.54 8972.44 -8442.60 822.51 5931130.69 666029.04 8482.45 5.95 MWD
13542.48 89.63 141.37 9043.50 8973.40 -8469.45 844.30 5931104.32 666051.41 8511.39 7.42 MWD
13590.00 89.63 141.37 9043.80 8973.70 -8506.57 873.97 5931067.86 666081.88 8551.35 0.00 MWD
• •
bp BP Alaska ~~
~ Baker Hughes INTEQ Survey Report ~vTE
Q
Company: BP Amoco DAte: 10/4t2007 Time: 09:15t05 : Page: 1
F'ietdc Prudhoe Bay Co-ordioate(NE) Refet~euce: WeU: X-30, True Narth
Site: PB X Pad Vertkal (TVD) Reterence: 40 : 30 M17/1995 00:00 7Q.1
Well: X-30 Sect~oe (VS) Reference: 1M1~11(O.OON,O:OdE,171.55Azi)
Wellpat6s X-30A Snrvey Cakalatioe Method: Minimum Curvature Db. OraGe
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well CeMre
Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007
Site: PB X Pad
TR-10-14
UNITED STATES : North Slope
Site Position: Northin~: 5937417.97 ft Latitade: 70 14 7.207 N
From: Map Easting: 664667.65 ft Longitude: 148 40 13.706 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.25 deg
Weli: X-30 Sbt Name: 30
Well Position: +N/-S 2126.61 ft Nort6ing: 5939552.68 ft Latitade: 70 14 28.122 N
+E/-W 400.89 ft Easting: 665021.98 ft Longitnde: f48 40 2.052 W
Position Uncertainty: 0.00 ft
Wellpath: X-30A Drilled From: X-30AP61
50-029-22550-01-00 Tie-onDepth: 12946.45 ft
Corrent Datum: 40 : 30 4/11/1995 00:00 Height 70.10 ft Above System Datum: Mean Sea Level
Magnetic Data: 9/28/2007 Declination: 23.57 deg
Field Strength: 57654 nT Mag Dip Angle: 80.87 deg
Vertical Section: Dept6 From (TVD) +N/-S +E/-W Direction
ft ft ft deg
32.10 0.00 0.00 171.55
Survey Program for Definitive Wellpath
Date: 10/1/2007 Validated: No Versioe: 3
Actual From To Survey Toolcode Tool Name
ft ft
200.00 11568.00 1: MWD - Standard (200.00-121 MWD MWD - Standard
11627.00 12861.00 1: MWD - Standard (11627.00-1 MWD MVVD - Standard
12880.00 12946.45 MWD (12880.00-13741.25) (2) MWD MWD - Standard
12973.05 14320.00 MWD (12973.05-14320.00) MVND MWD - Standard
A090~8t100
NIU TVD
ft ft
12946.45 9047.23 TIP
12973.05 9048.65 KOP
14320.00 9053.36 TD
Survey: MWD Start Date: 10/1/2007
Company: Baker Hughes WTEQ Engineer:
Tool: MWD;MWD - Standard Tied-to: From: Definitive Path
i ~
bp BP Alaska ~s
~ Baker Hughes INTEQ Survey Report 1NTE
Q
Company: BP Amoco Date: 10/4/2007 Time: 09:15:05 Psse: Z
Fiekic Prudhoe Bay Caordiante(NE) Refercacec WeIL• X-30, True North
Site: PB X Pad Vertieal (1'VD) Reference: ; 40 '. 30 4/1 t/1 995 00:00 70.1
Weit X-30 S ectae (VS) Reference: Well (O.OON,O .OOE,171. 55Azi)
Wellpat6: X-30A Survey Caknlatan Method: Minimu-tt Curvature Db: Ckacle
Sorvey
MD Incl Azim TVD SysTVD' N/S E/W MapN MapE VS DIS Tool
ft deg deg ft ft ft ft ft ft ft degN OOft
12946.45 85.88 183.07 9047.23 8977.13 -7926.72 642.10 5931642.46 665837.40 7934.98 0.00 MWD
12973.05 88.00 181.88 9048.65 8978.55 -7953.25 640.96 5931615.91 665836.83 7961.06 9.14 MWD
13002.96 83.70 170.23 9050.83 8980.73 -7982.96 643.00 5931586.26 665839.52 7990.74 41.41 MWD
13027.82 87.63 182.65 9052.71 8982.61 -8007.64 644.53 5931561.61 665841.59 8015.38 52.25 MWD
13059.87 89.85 174.30 9053.42 8983.32 -8039.64 645.38 5931529.64 665843.14 8047.16 26.95 MWD
13090.22 90.00 171.55 9053.46 8983.36 -8069.76 649.12 5931499.61 665847.54 8077.50 9.07 MWD
13723.31 91.84 170.60 9052.93 8982.83 -8102.44 654.25 5931467.05 665853.39 8110.58 6.26 MWD
13152.40 95.01 169.51 9051.19 8981.09 -8131.04 659.26 5931438.57 665859.03 8139.61 11.52 MWD
13184.88 95.23 167.88 9048.29 8978.19 -8162.76 665.61 5931407.00 665866.06 8171.92 5.04 MWD
13212.80 94.36 166.02 9045.96 8975.86 -8189.87 671.89 5931380.05 665872.93 8199.65 7.33 MWD
13261.90 94.40 162.59 9042.21 8972.11 -8236.99 685.13 5931333.23 665887.20 8248.21 6.97 MWD
13300.96 93.04 161.46 9039.67 8969.57 -8274.06 697.16 5931296.43 665900.04 8286.65 4.52 MWD
13334.90 91.35 160.91 9038.37 8968.27 -83U6.16 708.10 5931264.57 665911.68 8320.01 5.24 MWD
13364.37 90.83 157.38 9037.81 8967.71 -8333.69 718.58 5931237.28 665922.76 8348.78 12.11 MWD
13396.37 90.06 154.48 9037.56 8967.46 -8362.91 731.63 5931208.36 665936.45 8379.59 9.38 MWD
13426.41 89.54 153.78 9037.67 8967.57 -8389.94 744.74 5931181.63 665950.14 8408.26 2.90 MWD
13456.33 89.82 151.86 9037.83 8967.73 -8416.55 758.41 5931155.32 665964.39 8436.59 6.48 MWD
13488.76 90.18 149.53 9037.83 8967.73 -8444.83 774.28 5931127.40 665980.87 8466.89 7.27 MWD
13520.61 90.92 147.48 9037.53 8967.43 -8471.98 790.92 5931100.62 665998.10 8496.20 6.84 MWD
13550.31 90.49 145.52 9037.16 8967.06 -8496.75 807.31 5931076.22 666015.03 8523.11 6.76 MWD
13580.69 90.86 143.61 9036.80 8966.70 -8521.50 824.92 5931051.86 666033.17 8550.18 6.40 MWD
13610.58 89.35 142.55 9036.75 8966.65 -8545.39 842.87 5931028.37 666051.65 8576.45 6.17 MWD
13644.84 88.34 139.39 9037.44 8967.34 -8572.00 864.44 5931002.25 666073.79 8605.94 9.68 MWD
13669.82 88.80 138.59 9038.06 8967.96 -8590.84 880.83 5930983.77 666090.58 8626.99 3.69 MWD
13703.42 90.09 136.54 9038.39 896829 -8615.64 903.49 5930959.48 666113.79 8654.84 7.21 MWD
13731.98 88.68 134.60 9038.70 8968.60 -8636.03 923.48 5930939.53 666134.22 8677.95 8.40 MWD
13759.52 87.82 132.51 9039.54 8969.44 -8655.00 943.43 5930921.00 666154.57 8699.65 8.20 MWD
13789.92 87.18 130.82 9040.86 8970.76 -8675.18 966.12 5930901.32 666177.70 8722.95 5.94 MWD
13823.38 87.85 127.56 9042.31 8972.21 -8696.30 992.03 5930880.77 666204.06 8747.65 9.94 MWD
13851.10 86.38 125.77 9043.71 8973.61 -8712.84 1014.23 5930864.73 666226.62 8767.27 8.35 MWD
13883.23 86.00 123.79 9045.84 8975.74 -8731.12 1040.56 5930847.03 666253.34 8789.23 6.26 MWD
13914.13 86.15 121.89 9047.96 8977.86 -8747.84 1066.46 5930830.88 666279.60 8809.57 6.15 MWD
13946.60 85.97 120.17 9050.19 8980.09 -8764.54 1094.22 5930814.80 666307.71 8830.17 5.31 MWD
13972.10 85.96 122.80 9051.99 8981.89 -8777.82 1115.91 5930801.99 666329.69 8846.50 10.29 MWD
13998.24 85.35 125.71 9053.97 8983.87 -8792.49 1137.45 5930787.80 666351.54 8864.17 11.34 MWD
14030.54 86.72 129.38 9056.20 8986.10 -8812.12 1162.99 5930768.73 666377.51 8887.35 12.10 MWD
14060.01 87.14 132.42 9057.78 8987.68 -8831.39 1185.23 5930749.96 666400.16 8909.67 10.40 MWD
14090.92 88.92 134.90 9058.84 8988.74 -8852.71 1207.58 5930729.13 666422.97 8934.05 9.87 MWD
1412020 90.28 136.45 9059.05 8988.95 -8873.66 1228.03 5930708.64 666443.88 8957.78 7.04 MWD
14153.67 92.18 138.74 9058.33 8988.23 -8898.36 1250.60 5930684.43 666466.97 8985.53 8.89 MWD
14180.62 92.15 141.27 9057.31 8987.21 -8918.99 1267.91 5930664.19 666484.73 9008.48 9.38 MWD
14210.29 93.01 144.31 9055.97 8985.87 -8942.60 1285.83 5930640.99 666503.16 9034.46 10.64 MWD
14241.52 92.46 147.61 9054.48 8984.38 -8968.44 1303.29 5930615.53 666521.18 9062.59 10.70 MWD
14275.32 90.37 149.99 9053.65 8983.55 -8997.34 1320.79 5930587.02 666539.31 9093.75 9.37 MWD
14320.00 90.37 149.99 9053.36 898326 -9036.03 1343.14 5930548.84 666562.49 9135.31 0.00 MWD
rR~ = a° crov
WELLHEAD = FMC
ACTUATOR = BAKER
KB. E1EV = 70.01'
BF. ELEV = 39.00'
KOP = 1696'
Max Angle = 93 @ 12417'
Datum MD = 11522'
Datum ND = 8800' SS
X~~ O A SAFETY NOTES:
D RLG D RAFT ' 2,o2a ~ 4-v2° HES X NIP. ID = 3 813°
GAS LIFT MANDRELS
10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 3277~
ChemcutTBG ~ 11,396'
Minimum ID = 2.8" @ 13307'
2-7/8" OTIS X NIPPLE
I TOP OF 5-1/2" LNR ~ 11482~
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 11485'
7-5/8" CSG. 29.7#, NT-96. ID = 6.875" ~ ~ 162T
PERFORATION SUMMARY
REF LOG: GR/CCL ON 05/16/96
ANGLE AT TOP PERF: 59 @ 11608'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpnlSqz DATE
3-3/8" 6 11608 - 11628 isolated proposed
3-3/8" 6 11680 - 11740 isolated proposed
3-3/8" 4 11940 - 12130 isolated proposed
3-3/8" 4 12170 - 12350 isolated proposed
3-3/8" 4 12430 - 12620 isolated proposed
3-3/8" 4 12660 - 12950 isolated proposed
2 6 13360-13650 O 10/09/07
2 6 13720-14270 0 10/09/07
Top of Cement ~-i 12500'
Paro 12995'
5-1/2" LNR. 17#, L-80, .0232 bpf, ID = 4.892" 13043'
ST MD ND DEV TYPE VLV LATCH PORT DATE
5 3509 3248 45 KBG2 DOME BK 16 10/29/07
4 5870 4896 46 KBG2 SO BK 20 10/29/07
3 7775 6265 44 KBG2 DMY BK 0 09/16I07
2 9475 7510 41 KBG2 DMY BK 0 09/16/07
1 11009 7914 40 KBG2 DNII' BK 0 09/16/07
- 11, 286~ 4-1 /2" HES X NIP, ID = 3.813"
- 1~,307~ 7-5/8" x 4-1/2" BKR S-3 PKR. ID= 3.93"
- 11,331~ ~ 4-1/2" HES X NIP, ID = 3.813"
11,403~ Bottom of UNIQUE Overshot
11427~ 4-1/2" HES X NIP, ID = 3.813"
11438~ 7-5/8" x 4-1/2" BKR SABL-3 PKR, ID = 3.93"
11462~ 4-1/2" HES X NIP, ID = 3.813~
~ 11~47~ 4-1 /2" HES XN NIP, ID = 3.725"
11485~ ~4-1/2" WLEG, ID = 3.958" ~
11489~ ELMD TT LOGGED 05/16/96
12284'-12424~ ~J ~SSIBLE CMT SHEATH, 1~3.75"
12$$Q' -~Mechanical Whipstock ~
12,516' Otis "X" Nipple ID =2.8"
13,307' 3-3/16 x 2-7/8 X-over
3-3/16" X 2-7/8" cmt'ed and perfed~-1 14,320'
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/15195 MDO ORIGINAL HORIZ COMPL
07/19/01 RWTP CORRECTIONS
O6l02/04 JLA/KAK WANER SAFEf`( NOTE
08/02/05 EZUfLH DELETE WANER SFTY NOTE
10/10/07 Nordic 2 CTD
10/29l07 DAV/TLH GLV C/O
PRUDHOE BAY UNff
WELL: X-30
PERMff No: 1950410
API No: 50-029-22550-00
SEC 7, T10N, R14E
BP Exploration (Alaska)
a
~
~ ~iosioa STATE OF ALASKA
OiL AND GAS CONSERVATI4N COMMISSION
BOPE Test Report
submit to:
Contractor:
Nardic __ _ _ .
Rig No.: 2 DATE: 10/2/07
Rig Rep.: Holmes / Pederson R~ Phone: 659-4398 Rig Fax: 659-4356
Operator: BPX Op. Phone~ 659-4393 Op. Fax: 659-4356
Rep.: Secvik I Ross E-Maif :~ ~ ~ ~ ~ ~~ : ~ ` ~ ~ ~ ~ ~
_ . .. _ ,M_ _ .
Weil Name_ PBU X-30A PTD # 2070780
Operation: D~Ig: )OCX Wo~icover. E~cpior.:
Test: initial: Weekty: Bi-Weekly X70C
Test Pressure_ Rams: 250-35~ Annutar. 250-350t} Valves: 250-3500
MISC. INSPECTIONS: TEST DATA FL(30R SAFETY VQLVES:
Test Result Test Resutt Quantity Test Result
Location Gen.: P Well Sign P Upper Kelly NA
Houseke~ping: P Dri. Rig P ~.ower Kelly NA
PTD On Location P Hazard Sec. P Bal! Type 1 P
Standing Order Posted P Ins~ffe BQP NA
BOP STACK: Quanfity Si~e/Type Test ResuEt MUQ SYSTEM: Visual Alarm
Stripper 1 2 3/8" P 1`rip Tank P P
Annular Preventer 1 71/1~" P Pit Level indicators P P
#1 Rams 1 Blind f Shear P F1ow lndicator P P
#2 Rams 1 2 318"combi'~ P Meth Gas Detectoc P P
#3 Rams 1 2 3/8"x3 't!2" P H2S Gas Defecfor P P
#4 Rams 1 2 3f8"combi'f P
#5 Rams N/A NA Quantity Test Result
Choke Ln_ Valves 1 3118" P inside Reel vaives 1 P
HCR Vaives 2 31/8" P
KiN Line Valves 9 3 7/8" P ACCUMULA"TOR SYSTEM:
Check Valve 2 2 1/16" P Time/Pressure Test Result
Spsterrt Pressure 3000 P
CHOKE MANIFOLD: Fressure AfEer Closure 2300 P
Quantity Test Resuit 200 psi Attained 23 sec P
No. Valves 14 P Fuli Pressure Attained 1 min / 3sec P
Manual Chokes 1 P 81ind Swi#ch Covers: All stations Y
Hydraulic Chokes 1 F Nitgr~, Boftfes (avg): 4 210U
Test Results
Number of Failures: 0 T~s# Time: 5 Hou~'s Com[~onerrts tested 30
Repair or replacement of equipmen# wili be made within 0 days. Notify the N orth Slope
Inspector 659-3607, foilow with wMten confirmation #o Superviser at: ~ ~
~- , . _ ~..
. ..._ .
Remarks:
Distribution: 2A HQUR NOTfCE GiVEfV
orig-Well File YES NO )OCX
c- Oper./Rig Waived By Chuck Scheve
c- Da#abase Date 10>1107 Time 10:00
c- Trip Rpt File Witness Bill Daniell
c- Ins ector Test start t38:t?Q Fini~- 13:~
Coil Tubing BFL 11/09/04 Nordic ~ BOP 10-02-07p.xls
~ ~
~, :.
~4
~ ~~osiaa STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSIOPI
BOPE Test Report
Sutxnit #o. ~ . ~ ~~ _ _
Contractor.
Nardic
_ _.
_.
Rig No.: 2 DATE: 9/18/07
Rig Rep.: Mckeiman / Sloan R~ Phone: 65~4398 Ftig Fax: 659-4356
Operator: BPX Op. Phone: 659-4393 Op. Fax: 659-4356
Rep.: Hiidreth / Goodrich E-Maii ~ ° ~ ' ~~~ ~~~;
Weil Name: PBU X-30A PTD ~ ZQT0780
Operation: Drig: XXX Woricover. Euplor.:
Test: Initial: )OCX Weekly: Bi-Weekiy
Test Pressure: Rams: 25t?-3500 Anrrular. 25(1-3i?QO Valves: 250-3500
MISC. INSPECTIONS: TEST DATA FLC30R SAFETY VALVES:
Test Result Test Resutt Quantity Test Result
Location Gen.: P Wei! Sign P Upper Kelly NA
Housekeeping: P D~1. Rig P l~rnver Ke11y NA
PTD On Location P Hazand Sec. P Ball Type 2 P
Standing Order Posted P Inside BOP NA
BOP STACK: Quantity Size/Type Test Resuft MUD SYSTEM: ~sual Alarm
Stripper 1 2 318" P Trip Tank P P
Annular Preventer 1 71/16" P Pit Level indicators P P
#1 Rams 1 Blind / Shear P Flow Indicator P P
#2 Rams 1 2 3/8"combi's P Meth Gas Detectar P P
#3 Rams 1 2 3/8"ac31/2" P H2S Gas Detec~or P P
#4 Rams 1 2 3!8"cambi's P
#5 Rams WA NA Quantity Test Result
Choke Ln. Valves 1 3 1/8" P Inside Reel valves 1 P
HCR Valves 2 3 i/8" P
Kill Line Valves 1 3118" P ACCUMULATOR SYSTEM:
Check Valve Time/Pressure Test Result
System Pressute 3000 P
CH(aKE:MANI~OCD:
~K Pressure After Closure 2QOQ P
,', Quantify Test Result 200 psi Attained 23 sec P
No. Valves 14 P Full Pressure Attained 96 sec P
Manual Chokes 1 P Blind Switch Covers: All stations Y
Hydraulic Chokes 1 P Nitgn. Botties {avg}: 4@~ 21500
Test Resutts
Number of Failures: 0 ?sst Time: ~_0 Hours Com~nerrts tested 29
Repair or replacement of equipmen# ~nriil be made within 0 days. Notify the North Slope
Ins ctor 659-3607, follow with vvritten cctnfirm~tinn to Su nrisf:r at:
_.. ~ _. _.
_.
Remarks:
Distribution: 24 HOUR NOTICE GIVEN
orig-Well File YES )OOC NO
c- Oper./Rig Waived By Bob Noble
c- Database Date 9/96/07 Time 1500
c- Trip Rpt File Witness
c- Ins ector Test start 1030 Finish 153t3
Coil Tubing BFL 11/09/04 Nordic 2 BOP 9-18-07p.xls
~ ~
~ ~ ~ ~
~
SARAH PALIN, GOVERNOR
~"""`"-~~ 0~ ~~-7 333 W. 7thAVENUE, SUITE 100
COI~TSER~ttA7'Ip1~T COri1~iISSIOIQ ~ ANCHORAGE,ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 278-7542
Greg Sarber
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X-30A
BP Exploration (Alaska) Inc.
Permit No: 207-078
Surface Location: 4722' FSL, 876' FEL, SEC. 07, T10N, R14E, UM
Bottomhole Location: 1041' FNL, 2871' FWL, SEC. 20, T10N, R14E, UM
Dear Mr. Sarber:
Enclosed is the approved application for permit to redrill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field ~.
DATED this day of June, 2007
cc: Department of Fish 8v Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ~~~~-'~
ALASk~IL AND GAS CONSERVATION COMMI~N ~~~~~`~`~p
PERMIT TO DRILL
20 AAC 25.005 ~+~ M~~( ~~~pp~
1 a. Type of work
^ Drill ~ Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory p Deve~opment Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ~ Development Oil ^ Single Zone 1 c. Speci~~! if well is roposed for:
^ Cd~IB8~1~~~7~~kl~r,~ISS10f1
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well
Bond No. 6194193 11. WeII Name and Number:
PBU X-30A
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 17675 TVD 8980ss 12. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section):
Surface:
4722' FSL
876' FEL
SEC
07
T10N
R14E
UM 7. Property Designation:
ADL 047475 Pool
,
,
,
.
,
,
Top of Productive Horizon:
2175' FNL, 199' FEL, SEC. 18, T10N, R14E, UM 8• Land Use Permit: 13. Approximate Spud Date:
August 7, 2007
Total Depth:
1041' FNL, 2871' FWL, SEC. 20, T10N, R14E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
4,515'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-665022 y-5939553 Zone-ASP4 10. KB Elevation
(Height above GL): 70.1 feet 15. Distance to Nearest Well Within Pool:
780'
16. Deviated Wells: Kickoff Depth: 12950 feet
Maximum Hole An le: 96 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3400 SurFace: 2520
18; Casin Pro ram: S ecificatio ns To - Settin De th - Bo ttom anf of Cement c.f: or sack
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta e data
4-1 /8" 3-3/16~~ X za~e~~ 6.2# / 6.16# L-80 TCI I! STL 5530' 11470' 8774' 17675' 8980' 290 sx Class 'G'
19. PRESE NT WELL CONDITION SUMMARY (To be eompleted forRedrill and Re-entry Operations) ;
Total Depth MD (ft):
13043 Total Depth TVD (ft):
9055 . Plugs (measured):
11473 Effective Depth MD (ft):
12955 Effective Depth TVD (ft):
9048 Junk (measured):
None
Casing Length . : Size ' CementVolume MD ND
Conductor / Structural g' 20" Ar i A r x. 111' 111'
Surface 3247' 10-3'/4"- 965 sx CS III 375 sx'G'" 140 sx Coldset II 3277' 3083'
Intermediate 11601' 7-5/8" 265 sx Class'G' 11628' 8924'
Pr i n
Liner 1561' 5-1 /2" 185 .sx Class 'G 11482' - 13043' 8850' - 9055'
Perforation Depth MD (ft): 11608' - 12950' PerForation Depth ND (ft): $914' - 9048' -
20. Attachments ~ Filing Fee, $100 ~ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Gre9 Sarber, 564-4330
Printed Name Gr Sarber Title CT Drilling Engineer
Prepared By Name/Number:
Si nature Phone 564-4330 Date~~~ 2S'`Q ~Terrie Hubble, 564-4628
' Commission Use Onl
Permit To Drill
Number: ~~~~ ~~ API Number:
50-029-22550-01-00 Permit Approval
Date: j° See cover letter for
otherre uiremen s
Conditions of ApprovaL
If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydr s or gas contained shales: ~
~3 ~ PS~~ ;? ~, p~~ Samples Req'd: ^ es [~No Mud Log Req'd: ^ Yes ~No
.~._~
HZS Measures: Yes No Dir ' nal Survey Req'd: ~Yes ^ No
Other:
Date ~ APPROVED BY THE COMMISSION
, COMMISSIONER
Form 10-401 Revised 12/2005 U[~' ~ f ~ Submit In Duplicate
~ ~
bp
BP
Prudhoe Bay X-30A CTD Sidetrack
May 16, 2007
CTD Sidetrack Summarv
Pre-Rig Work:
1. O Functions test LDS
2. O PPPOT-T, IC
3. O Install 2"d full opening valve on IA.
4. S Pull SSSV and plug in XN nipple at 11,473'.
5. S Drift for chemical cut in 4-1/2" Tubing.
6. S Run Multifinger caliper from TTail to surface.
7. E Set HES fast drill plug in TTail between X and XN nipples at 11,468'. (Ref Tubing Tally)
8. E Chemical cut at 11,396', (Middle of first full joint above the pkr)
9. O CMIT T x IA to 3500 psi. MIT OA to 2000 psi.
10. O Load T and IA with seawater circ thru chem cut and FP T& IA to 2000' with diesel.
11. O Bleed T, IA, OA to zero.
12. O Sef BPV
13. O Bleed production flow lines and GL lines down to zero and blind flange
14. O Remove wellhouse, level pad
Rig Workover Operations: (Scheduled to begin on August 1, 2007)
1. MIRU Nordic rig #2, pull BPV.
2. Circulate well to clean KWF thru tubing cut, set TWC.
3. ND tree, NU BOPE and test. Pull TWC
4. Pull old 4-1/2" L-80 production tubing from chemical cut at 11,396'.
5. RU Slickline. Make 8-1/2" gauge ring junk basket and LIB runs.
6. Begin running new 4-1/2" completion below Haliburton RTTS storm packer.
7. Set storm packer.
8. Replace IC Packoffs
9. Retrieve storm packer.
10. Continue running 4-1/2" 13Cr-80 VAM Top tubing string with new 9-5/8" packer, Unique overshot. Packer
~11,350'.
11. Space out. Circ Inhibited brine into IA. Set packer. Test IA and Tubing. Circ in FP into top 2000' of IA.
12. Set TWC. ND BOPE, NU Production tree and test.
Rig Sidetrack Operations: (Scheduled to begin on August 7, 2007)
1. NU 7-1/16" CT Drilling BOPE and test.
2. RU Slickline. Retrieve ball and rod, RHC plug. Dummy off upper GLM.
3. RU Coil. R1H, drill up fast drill plug at 11,468', and open up XN nipple to 3.80".
4. Set whipstock with top at ~12,950'.
5. Mill 3.80" window at 12,950'.
6. Drill build/turn section with 3.75" x 4.125" bicenter bit, and land well.
7. Drill lateral section to 16,475'. Possibly longer, see discussion in PTD summary.
8. Run and cement a 2-7/8" x 3-3/16° L-80 liner string, abandoning perFs below 12,500'.
9. Make a cleanout run with mill and motor and SWS CNL logging tool.
10. PerForate welL
11. Circulate well to KWF brine. FP weN to 2000' with diesel.
12. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
13. RDMO Nordic 2.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
3. Run Live gas lift design. ~ ~
4. Rerun SSSV when running GLV's.
5. Test separator (~600' of prefs)
Mud Program:
• Well kill: 8.4 ppg brine.
• Workover: 8.4 ppg brine. With biozan sweeps
• Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.7 ppg Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 3.75"x4-1/8" (bi-center bits used)
Casing Program: fully cemented liner
• 3-3/16", L-80 6.2# TC11 11,470" md - 13,950' md
• 2-7/8", L-80 6.16# STL 13,950'md -17,675'md
• A minimum of 60 bbls 15.8 ppg cement will be used for liner cementing. (Assuming TD @ 17,675',
and planning on 40% excess in the open hole interval)
• TOC planned at 12,500' (See discussion below)
Existinq casinq/tubinq Information
10-3/4", L-80 45.5#, Burst 5210, collapse 2480 psi
7 5/8", L-80 29.7#, Burst 6890, collapse 4790 psi
5-1/2", L-80 17#, Burst 7740, collapse 6290 psi
4-1/2", L-80 12.6#, Burst 8430, collapse 7500 psi
Cementing Discussion
The parent well X-30 is a horizontal production well completed in ivishak zone 4. It currently has badly
corroded tubing causing T x lA communication. It has also failed an NFT-IA, so is secured with a tubing tail
plug and the well shut in. A workover will be performed changing the 4-1/2" L-80 production tubing to 4-1/2"
chrome, using a stacker packer completion. After the workover, a whipstock will be set near TD in the
production liner, and a coil tubing sidetrack drilled. The cement job on the sidetrack liner is planned to come
up to 12,500' MD in the parent wellbore (Inclination 89.9 deg). Perforations in the parent well above this depth
are intended to be preserved. Perforations below this depth are intended to be abandoned by the liner cement
job. The plan is to leave 520' of open perforations in the parent wellbore above the cement top depth while
abandoning 410' below the cement top. The inclination of the top perforation in the parent well is 59 deg.
One factor that should be considered is that predicting the cement top using current coil tubing
technology is not exact. The cement job is designed so that the cement top is at a relative "high" in the parent
well. However annular spaces in this type of completion are very small and a slight difference in cement
volumes significantly affects the height of the cement top. There is a small possibility that some or all of the
perForations above 12,500' will be covered by cement. A sketch showing the well geometry is attached to give
clarity to the situation. As it is desired to continue production from the parent wellbore perforations, we have
as a contingency plan, the ability to reperforate the existing perforations to re-establish communication to
them.
Extended Reach Discussion
The TD requested in the permit to drill is 17,675'. This is considerably past what our models predict is
achievable with coil tubing in a conventional sliding mode. Our models predict that it is only possible to reach
a depth of 16,475' using our standard CTD techniques. BP's intention on this well is to conduct a test of a new
down hole drilling tractor tool to assist weight on bit while drilling and for running liner 1,200' past what our
models predict is possible. This is new technology which could offer opportunities for coil tubing to achieve
extended reach targets for future sidetrack well candidates.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will~tested to 250 psi and 2500 psi. ~
Directional
• See attached directional plan. Max. planned hole angle is 91.6 deg.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 4,515 ft.
• Distance to nearest well within pool - 7$0 ft. (X-33)
Logging
• MWD directional, Gamma Ray, Resistivity will be run over all of the open hole section.
• A cased hole MCNL/GR/CCL log will be run.
Hazards
• The maximum recorded H2S level on X Pad is 150 ppm.
• The maximum recorded H2S level on X-30 was 10 ppm on 4/11/2005.
• Lost circulation risk is average.
• Leak at SSSV - monitor IA throughout job. Double valve the IA for MIRU. Rerun dummy valve in
upper GLM prior to beginning sidetrack.
Reservoir Pressure
• The max reservoir pressure was measured at 3400 psi at 8800'ss in June 2005. (7.5 ppg EMW).
• Max. surface pressure with gas (0.10 psi/ft) to surface is 2520 psi. °w~°--
Greg Sarber
CTD Engineer
CC: Well File
Sondra Stewman/Terrie Hubble
~
"
TREE- CIW
4
WELLh#AD = FMC
ACTWiTOR= BAKER
KB E1EV = 70 01'
BF ELEV = 3900'
KOP- 1fiB6'
___. . .... __ .
f~x Angle = ____ - - --- -
30 ~ 1241 T
patum MD = 11522'
Qalum TV ~= 8800' SS
10-3l4" CSG. 45.5N, L-80, 10 = 9 953" 3277'
~ cr,e,-, ~.,~ ; 9c N ~.
Minimum ID = 3.80" ~ 11473'
4-1/2" HES XN NIPPLE
TOP OF 3•31t 6° LN
3.5" XN l~Fp 2 75' ID
TOP OF 5-12' LNR 11
fHG, ~ 2.6AI. L-H0, 0152 bpf, ID = 3 95B" 1--r 11
REF LOG GWCCL ON OS/16e96
A NGLE A T TOP PERF 59 ~ 116p8'
Note: Refer lo Roduct~on DB for histor~cal perf data
SIZE SPF INTERVAL OpnfSqz a4TE
~3B" 6 11608 • 11628 sola;ed proposed
33B" 6 11680 - 11740 5olaced proposed
33B" 4 11940 - 12130 ~olated proposad
33J8" 4 12170 - 12350 ~solated propoced
3318" 4 12430 - 12620 ~solated proposed
33l6" 4 12660-12950 rsolated oroposed
X~30 A SAfETYNOTE3:
Proposed CTD Sidetrack
27'
Top of Grront H 12600'
~4112"HESfXOSSSVNIP,ID-3813" I
(;AS 1 IFT MA Nf]RFi S
ST WID ND ~El/ TYFE VLV LATCH PDRf d4TE
3001 2810 39 CAM BK
5 5845 4808 45 CAM BK
4 7820 6228 44 CAM BK
3 9422 7400 42 CAM BK
2 10631 8301 48 CAM BK
1 1~3~8 8~7 58 CAM BK
11427' ~ 4-t12'HESXNP,ID=3813"
~~q38' 7-S/B" x 4-1f2" BKRSABL•3 i
1146~ 4-1/2` HES Ji N~, ID = 3 813"
I ~~4tJ~j' I~47!L'-WLtli,lU=J.kl,C"I
.._ .__-__'~
11489' ~ ELMD TT LCGGED OS116~96 ;
Mecha^ca
3-3i16 Y %
K
3-3/16' X 2-7/B" emt'ed and
CSATE REV BY CAMNIENTS QATE REV BY CAMhAEMS
05175195 MDO OFIGINAL HOPoZ COMPL
07119/01 Rf~YTP CARRECTIONS
06102n(l4 JLAIKAK WANERSAFETY NOTE
0&02nD5 EZUTLH DELEfE WAN~t SFfY NOTE
09125rD5 WiSITI.H XXN PLUG (07R6/OS)
PF2UDHOE BAY UNff
WE1L: X-30
PERhAT Pb-'1950410
API W: 50-029-22550-00
SEC 7, T~ ON, R14E
BP 6cploration (Alaska)
` bp ~ BP Alaska ~
~ Baker Hu hes INTE Pla~nin Re ort
g Q g P
B~R ~
~s
INTEQ
Company: BP Amoco Date: 5/17/2007 Time: 14:27:51 Page. 1
Field: Prudhoe Bay Co-ordin$te(NE) Reference: WeiL• X-30, True North
Site: PB X Pad Vertical (1'Vb) Reference: 40 : 30 4/11/1995 00:00 70.1
WeIL• X-30 Section (VS) Reference: Site (-2126.61 N,-400.89E,140.OOAzi}
Wetlpath: Plan 9, X-30A Survey CalcalaNon Metbod: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level GeomagneHc Model: bggm2006
Site: PB X Pad
TR-10-14
UNITED STATES : North Slope
Site Position: Northing: 5937417. 97 ft Latitude: 70 14 7.207 N
From: Map Easting; 664667. 65 ft Longitude: 148 40 13.706 W
PosiHon Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.25 deg
Well: X-30 Slot Name: 30
Well PosiNon: +N/-S 2126.61 ft Northing: 5939552. 68 ft Latitude: 70 14 28.122 N
+E/-W 400.59 ft Easting : 665021. 98 ft Longitude: 148 40 2.052 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 9, X-30A Drilled From: X-30
Tie-on Dept6: 12 925.00 ft
Current Daturo: 40 : 30 4/11/1995 00 :00 Height 70. 10 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/15/2007 Declination: 23.82 deg
Field Strength: 57662 aT Mag Dip Angle: 80.91 deg
Vertical Sechon: Depth From (TVD) +N/-S +E/-W Direc tion
R ft ft deg
32.10 -2126.61 -400.89 140.00
Plan: Pian #9 Date Composed: 5/17/2007
Version: 7
Principal: Yes Tied-to: From: Definitive Path
Targets
Map Map <- L~titude ---> <- Longitude -->
Name Description TVD +N/-S +E/-W Nortning Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft fF ft ft ft
X-30A Polygon 70.10 -7685.12 459.94 5931880.00 665650.00 70 13 12.539 N 148 39 48.695 W
-Polygon 1 70.10 -7685.12 459.94 5931880.00 665650.00 70 13 12.539 N 148 39 48.695 W
-Polygon 2 70.10 -8002.48 472.00 5931563.00 665669.00 70 13 9.417 N 148 39 48.345 W
-Polygon 3 70.10 -8427.22 682.77 5931143.00 665889.00 70 13 5.240 N 148 39 42.226 W
-Polygon 4 70.10 -9028.58 1101.73 5930551.00 666321.00 70 12 59.325 N 148 39 30.063 W
-Polygon 5 70.10 -9877.99 1702.33 5929715.00 666940.00 70 12 50.970 N 148 39 12.630 W
-Polygon 6 70.10 -10556.27 2299.66 5929050.00 667552.00 70 12 44.298 N 148 38 55.294 W
-Polygon 7 70.10 -10889.53 2626.47 5928724.00 667886.00 70 12 41.019 N 148 38 45.811 W
-Polygon 8 70.10 -11892.15 3919.92 5927750.00 669201.00 70 12 31.153 N 148 38 8.280 W
-Polygon 9 70.10 -10425.19 3851.01 5929215.00 669100.00 70 12 45.581 N 148 38 10.258 W
-Polygon 10 70.10 -10318.52 2633.97 5929295.00 667881.00 70 12 46.635 N 148 38 45.587 W
-Polygon 11 70.10 -9488.75 1833.89 5930107.00 667063.00 70 12 54.798 N 148 39 8.808 W
-Polygon 12 70.10 -8852.51 1420.69 5930734.00 666636.00 70 13 1.056 N 148 39 20.801 W
-Polygon 13 70.10 -8397.26 1141.56 5931183.00 666347.00 70 13 5.534 N 148 39 28.904 W
-Polygon 14 70.10 -7708.32 788.54 5931864.00 665979.00 70 13 12.310 N 148 39 39.153 W
X-30A Fault 1 70.10 -8042.55 -576.20 5931500.00 664622.00 70 13 9.023 N 148 40 18.784 W
-Polygon 1 70.10 -8042.55 -576.20 5931500.00 664622.00 70 13 9.023 N 148 40 18.784 W
-Polygon 2 70.10 -8910.05 348.10 5930653.00 665565.00 70 13 0.492 N 148 39 51.944 W
-Polygon 3 70.10 -9904.63 1228.60 5929678.00 666467.00 70 12 50.709 N 148 39 26.383 W
-Polygon 4 70.10 -10242.29 1391.26 5929344.00 666637.00 70 12 47.388 N 148 39 21.663 W
-Polygon 5 70.10 -10648.96 1781.47 5928946.00 667036.00 70 12 43.387 N 148 39 10.338 W
-Polygon 6 70,10 -11116.32 1974.30 5928483.00 667239.00 70 12 38.790 N 148 39 4.743 W
-Polygon 7 70.10 -11759.91 3179.59 5927866.00 668458.00 70 12 32.457 N 148 38 29.766 W
-Polygon 8 70.10 -11116.32 1974.30 5928483.00 667239.00 70 12 38.790 N 148 39 4.743 W
-Polygon 9 70.10 -10648.96 1781.47 5928946.00 667036.00 70 12 43.387 N 148 39 10.338 W
-Polygon 10 70.10 -10242.29 1391.26 5929344.00 666637.00 70 12 47.388 N 148 39 21.663 W
-Polygon 11 70.10 -9904.63 1228.60 5929678.00 666467.00 70 12 50.709 N 148 39 26.383 W
~ bp ~ BP Alaska ~
~ Baker Hu hes INTE Plannin Re ort
g Q g P
~~r
s Mt1G1~S
INTEQ
Compaeyc BPAmoco Date: 5N7/2007 Time: 14:27:51 Page. 2
Field: Prudhoe Bay Co-ordinate(NE) Referencr. Weli: X-30, True Nortlr
Site: PB X Pad Verticsl (TVD) Reference: 40 : 30 4/11/1995 00:00 70.1
Well: X-30 SecNon (VS) Reference: Site (-2126.61 N,-400.89E,140.OOAzi)
Wellpat6: Plan 9, X-30A Survey C$Iculation Methodc M inimum Curvature Db: Oracle
Targets
Map Map <---- Ladtude --> <-- Longitude =-->
Name pescripHon TVD +NhS +E/-W Northing Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
-Polygon 12 70.10 -8910.05 348.10 5930653.00 665565.00 70 13 0.492 N 148 39 51.944 W
X-30A Fault 2 70.10 -8764.67 424.30 5930800.00 665638.00 70 13 1.921 N 148 39 49.732 W
-Polygon 1 70.10 -8764.67 424.30 5930800.00 665638.00 70 13 1.921 N 148 39 49.732 W
-Polygon 2 70.10 -8686.42 962.18 5930890.00 666174.00 70 13 2.690 N 148 39 34.114 W
-Polygon 3 70.10 -8488.39 1511.68 5931100.00 666719.00 70 13 4.637 N 148 39 78.157 W
-Polygon 4 70.10 -8686.42 962.18 5930890.00 666174.00 70 13 2.690 N 148 39 34.114 W
X-30A Fault 4 70.10 -10903.59 1897.94 5928694.00 667158.01 70 12 40.883 N 148 39 6.959 W
-Polygon 1 70.10 -10903.59 1897.94 5928694.00 667158.01 70 12 40.883 N 148 39 6.959 W
-Polygon 2 70.10 -10615.46 2581.46 5928997.00 667835.01 70 12 43.715 N 148 38 47.115 W
-Polygon 3 70.10 -10521.88 2693.54 5929093.00 667945.01 70 12 44.635 N 148 38 43.860 W
-Polygon 4 70.10 -10615.46 2581.46 5928997.00 667835.01 70 12 43.715 N 148 38 47.115 W
X-30A Fault3 70.10 -9516.10 936.01 5930060.00 666166.01 70 12 54.531 N 148 39 34.876 W
-Polygon 1 70.10 -9516.10 936.01 5930060.00 666166.01 70 12 54.531 N 148 39 34.876 W
-Polygon 2 70.10 -9518.97 1752.20 5930075.00 666982.01 70 12 54.501 N 148 39 11.180 W
-Polygon 3 70.10 -9610.63 1918.25 5929987.00 667150.01 70 12 53.599 N 148 39 6.360 W
-Polygon 4 70.10 -9518.97 1752.20 5930075.00 666982.01 70 12 54.501 N 148 39 11.180 W
X-30A Target 1 9018.10 -9015.69 1381.10 5930570.00 666600.01 70 12 59.451 N 148 39 21.951 W
X-30A Target 3 9050.10 -9994.76 2009.87 5929605.00 667250.01 70 12 49.821 N 148 39 3.703 W
X-30A Target 4 9050.10 -10695.18 2704.75 5928920.00 667960.01 70 12 42.930 N 148 38 43.537 W
X-30A Target5 9050.10 -11048.22 3752.35 5928590.00 669015.01 70 12 39.454 N 148 38 13.132 W
X-30A Target2 9062.10 -9776.95 1884.60 5929820.00 667120.01 70 12 51.963 N 148 39 7.338 W
Annotation
MD TVD
ft ft
12925.00 9046.19 TIP
12950.00 9048.09 KOP
12970.00 9049.35 End of 9 Deg/100' DLS
13025.97 9050.13 4
13225.97 9044.91 End of 10 Deg/100' DLS
14150.97 9020.18 6
14325.97 9018.11 7
15000.97 9051.32 8
15225.97 9061.93 9
15360.97 9055.24 10
15505.97 9048.55 11
16030.97 9050.83 12
16280.97 9051.11 13
16680.97 9048.40 14
17675.00 0.00 TD
Plan Section Information
MD Incl Azim TVD +N/S +FJ-W DLS Buiid Turn TFO Target
ft deg deg ft ft ft deg/10Uft deg/100ft deg/100ft deg
12925.00 85.60 185.40 9046.19 -7905.26 642.76 0.00 0.00 0.00 0.00
12950.00 85.68 185.09 9048.09 -7930.08 640.48 1.28 0.32 -1.24 284.50
12970.00 87.06 183.93 9049.35 -7 949.98 638.91 9.00 6.90 -5.79 320.00
13025.97 91.35 180.34 9050.13 -8 005.88 636.83 10.00 7.67 -6.42 320.00
13225.97 91.61 160.33 9044.91 -8201.98 670.23 10.00 0.13 -10.00 271.00
14150.97 91.35 123.32 9020.18 -8916.30 1231.86 4.00 -0.03 -4.00 270.10
14325.97 90.00 130.79 9018.11 -9020.95 1371.97 4.00 -0.77 3.93 101.00
15000.97 84.45 156.66 9051.32 -9 557.13 1770.30 4.00 -0.82 3.92 102.30
bp ~ BP Alaska ~'
~ Baker Hu hes INTE Plannin Re ort
g Q g P
s~ ~~
Nuc,~s
INTEQ
Compaay: BP Amoco Datr. 5/17/2007 Time: 14:27:51 Page: 3
Field: P rudhoe Bay Co-ordinate(NE) Reference: Weli: X-30, True North
Site: P B X Pad Vertical (1'VD) Reference: 40 : 30 4/11/1995 00:00 70.1
Well: X -30 SecHon (VS) Referenee: Site (-2126.61 N,-400.89E,140.OOAzi)
Wellpath: Plan 9, X-30A Survey CaleulaNoo Method: Minimum Gurvature Db: Oracle
Plan SecHon InformaHon
MD Inci Azim TVD +NlS +FJ-W DLS Build Turn TFO Target
R deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
15225.97 90.14 149.67 9061.93 -9757.45 1871.68 4.00 2.53 -3.10 309.00
15360.97 95.54 149.67 9055.24 -9873.79 1939.74 4.00 4.00 0.00 0.00
15505.97 89.74 149.67 9048.55 -9998.76 2012.85 4.00 -4.00 0.00 180.00
16030.97 89.76 128.67 9050.83 -10393.80 2354.16 4.00 0.00 -4.00 270.00
16280.97 90.11 138.67 9051.11 -10566.20 2534.77 4.00 0.14 4.00 88.00
16680.97 90.66 122.68 9048.40 -10826.03 2837.16 4.00 0.14 -4.00 272.00
17675.00 89.16 82.94 9049.99 -11042.01 3787.12 4.00 -0.15 -4.00 267.90
3urvey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/1pOft ft deg
12925.00 85.60 185.40 8976.09 -7905.26 642.76 5931663.93 665837.59 0.00 5097.55 0.00 MWD
12950.00 85.68 185.09 8977.99 -7930.08 640.48 5931639.06 665835.85 1.28 5115.10 284.50 MWD
12970.00 87.06 183.93 8979.25 -7949.98 638.91 5931619.13 665834.72 9.00 5129.33 320.00 MWD
12975.00 87.44 183.61 8979.49 -7954.96 638.59 5931614.15 665834.50 10.00 5132.94 320.00 MWD
13000.00 89.36 182.00 8980.19 -7979.92 637.36 5931589.17 665833.82 10.00 5151.27 320.02 MWD
13025.00 91.28 180.40 8980.05 -8004.91 636.84 5931564.17 665833.85 10.00 5170.08 320.06 MWD
13050.00 91.39 177.93 8979.46 -8029.90 637.20 5931539.20 665834.75 9.87 5189.45 272.70 MWD
13075.00 91.43 175.43 8978.84 -8054.85 638.64 5931514.29 665836.74 10.00 5209.49 270.94 MWD
13100.00 91.47 172.93 8978.21 -8079.71 641.18 5931489.49 665839.82 10.00 5230.17 270.88 MWD
13125.00 91.50 170.43 8977.56 -8104.44 644.79 5931464.85 665843.97 10.00 5251.43 270.82 MWD
13150.00 91.53 167.93 8976.90 -8128.98 649.48 5931440.42 665849.20 10.00 5273.25 270.75 MWD
13175.00 91.56 165.43 8976.22 -8153.30 655.24 5931416.23 665855.49 10.00 5295.58 270.69 MWD
13200.00 91.59 162.93 8975.54 -8177.34 662.05 5931392.35 665862.82 10.00 5318.38 270.62 MWD
13225.00 91.61 160.43 8974.84 -8201.06 669.91 5931368.81 665871.20 10.00 5341.60 270.55 MWD
13250.00 91.61 159.37 8974.13 -8224.53 678.51 5931345.54 665880.31 4.23 5365.10 270.14 MWD
13275.00 91.61 158.37 8973.43 -8247.84 687.51 5931322.43 665889.82 4.00 5388.74 270.07 MWD
13300.00 91.61 157.37 8972.73 -8270.99 696.93 5931299.50 665899.74 4.00 5412.53 270.04 MWD
13325.00 91.61 156.37 8972.02 -8293.97 706.75 5931276.74 665910.06 4.00 5436.44 270.02 MWD
13350.00 91.61 155.37 8971.32 -8316.77 716.96 5931254.16 665920.77 4.00 5460.48 269.99 MWD
13375.00 91.61 154.37 8970.62 -8339.40 727.58 5931231.78 665931.88 4.00 5484.63 269.96 MWD
13400.00 91.61 153.37 8969.91 -8361.83 738.58 5931209.59 665943.37 4.00 5508.90 269.93 MWD
13425.00 91.61 152.37 8969.21 -8384.07 749.98 5931187.61 665955.25 4.00 5533.26 269.90 MWD
13450.00 91.61 151.37 8968.51 -8406.11 761.76 5931165.84 665967.51 4.00 5557.71 269.88 MWD
13475.00 91.60 150.37 8967.81 -8427.94 773.93 5931i44.28 665980.15 4.00 5582.26 269.85 MWD
13500.00 91.60 149.37 8967.11 -8449.55 786.47 5931122.95 665993.17 4.00 5606.88 269.82 MVND
13525.00 91.60 148.37 8966.41 -8470.94 799.40 5931101.85 666006.55 4.00 5631.57 269.79 MWD
13550.00 91.59 147.36 8965.72 -8492.10 812.69 5931080.98 666020.31 4.00 5656.32 269.76 MWD
13575.00 91.59 146.36 8965.02 -8513.03 826.35 5931060.36 666034.42 4.00 5681.13 269.74 MWD
13600.00 91.58 145.36 8964.33 -8533.71 840.37 5931039.99 666048.89 4.00 5705.99 269.71 MWD
13625.00 91.58 144.36 8963.64 -8554.15 854.75 5931019.88 666063.72 4.00 5730.89 269.68 MWD
13650.00 91.57 143.36 8962.96 -8574.33 869.49 5931000.02 666078.89 4.00 5755.83 269.65 MWD
13675.00 91.56 142.36 8962.27 -8594.25 884.58 5930980.44 666094.41 4.00 5780.79 269.63 MWD
13700.00 91.56 141.36 8961.59 -8613.91 900.01 5930961.13 666110.27 4.00 5805.76 269.60 MWD
13725.00 91.55 140.36 8960.92 -8633.29 915.78 5930942.09 666126.46 4.00 5830.75 269.57 MWD
13750.00 91.54 139.36 8960.24 -8652.40 931.89 5930923.35 666142.98 4.00 5855.74 269.54 MWD
13775.00 91.53 138.36 8959.57 -8671.22 948.33 5930904.89 666159.83 4.00 5880.73 269.52 MWD
13800.00 91.52 137.36 8958.91 -8689.75 965.10 5930886.73 666177.00 4.00 5905.70 269.49 MWD
13825.00 91.51 136.36 8958.25 -8707.99 982.19 5930868.88 666194.48 4.00 5930.65 269.46 MWD
13850.00 91.50 135.36 8957.59 -8725.92 999.59 5930851.33 666212.27 4.00 5955.58 269.44 MWD
13875.00 91.49 134.36 8956.93 -8743.55 1017.31 5930834.09 666230.37 4.00 5980.47 269.41 MWD
13900.00 91.48 133.36 8956.29 -8760.87 1035.33 5930817.18 666248.76 4.00 6005.32 269.38 MWD
13925.00 91.47 132.36 8955.64 -8777.87 1053.65 5930800.58 666267.44 4.00 6030.12 269.36 MWD
13950.00 91.46 731.36 8955.00 -8794.54 1072.26 5930784.32 666286.42 4.00 6054.86 269.33 MWD
" bp '~ BP Alaska i
~ Baker Hu hes INTE Plannin Re ort
g Q g P
s~ ~r
Nuc~s
INTGQ
Company: BP Amoco Date: 5/1?/2007 Time: 14:27:51 Page: 4
Field: Prudhoe Bay Co-ordinate(NE)Reference; Well: X-3Q True North'
Site: PB X Pad Vertic$ 1(1'VD) Reference: 40 : 30 4l11/1995 00:00 70.1
Well: X30 Section (VS) Reference: Site{-2126.61N,-400.$9E,140.OOAzi)
Wellpath: Pia n 9, X-30A Survey CalculaNon Method: Minimum Curvature Db: Orade
Survey
MD Incl Azim SS 1'VD N/S FJW MapN MapE DL.S VS TFO Tooi
ft deg deg R ft ft ft ft deg/t00ft ft deg
13975.00 91.45 130.36 8954.37 -8810.59 1091. 16 5930768.39 666305.67 4.00 6079.53 269.31 MWD
14000.00 91.43 129.36 8953.74 -8826.91 1110. 34 5930752.79 666325.20 4.00 6104.13 269.28 MWD
14025.00 91.42 128.36 8953.12 -8842.59 1129. 81 5930737.54 666345.00 4.00 6128.65 269.26 MWD
14050.00 91.41 127.36 8952.50 -8857.93 1149. 54 5930722.64 666365.06 4.00 6153.08 269.23 MWD
74075.00 91.39 126.36 8951.89 -8872.92 1169. 53 5930708.09 666385.38 4.00 6177.42 269.21 MWD
14100.00 91.38 125.36 8951.29 -8887.56 1189. 79 5930693.90 666405.95 4.00 6201.66 269.18 MWD
14125.00 91.36 124.36 8950.69 -8901.85 1210. 30 5930680.07 666426.76 4.00 6225.78 269.16 MWD
14150.00 91.35 123.36 8950.10 -8915.77 1231. 05 5930666.60 666447.81 4.00 6249.79 269.13 MWD
14175.00 91.16 124.26 8949.55 -8929.66 1251. 83 5930653.17 666468.89 3.69 6273.79 101.50 MWD
14200.00 90.97 125.25 8949.09 -8943.91 1272. 36 5930639.37 666489.73 4.00 6297.90 101.02 MWD
14225.00 90.78 126.23 8948.70 -8958.51 1292. 65 5930625.22 666510.33 4.00 6322.13 101.04 M1ND
14250.00 90.59 127.21 8948.41 -8973.46 1312. 69 5930610.72 666530.69 4.00 6346.46 101.05 MWD
14275.00 90.40 128.19 5948.19 -8988.74 1332. 47 5930595.87 666550.80 4.00 6370.88 101.07 MWD
14300.00 90.20 129.17 8948.06 -90p4.37 1351. 99 5930580.68 666570.65 4.00 6395.40 101.07 MWD
14325.00 90.01 130.15 8948.01 -9020.32 1371. 23 5930565.15 666590.24 4.00 6419.99 101.08 MWD
14350.00 89.80 131.13 8948.05 -9036.61 1390. 20 5930549.29 666609.56 4.00 6444.66 102.25 MWD
14375.00 89.59 132.11 8948.19 -9053.21 1408. 89 5930533.10 666628.61 4.00 6469.39 102.30 MWD
14400.00 89.37 133.08 8948.42 -9070.13 1427. 30 5930516.59 666647.38 4.00 6494.18 102.29 MWD
14425.00 89.16 134.06 8948.74 -9087.36 1445. 41 5930499.76 666665.86 4.00 6519.02 102.28 MWD
14450.00 88.95 135.04 8949.15 -9104.90 1463. 22 5930482.62 666684.05 4.00 6543.90 102.27 MWD
14475.00 88.74 136.02 8949.65 -9122.73 1480. 73 5930465.17 666701.95 4.00 6568.82 102.26 MWD
14500.00 88.52 136.99 8950.25 -9140.86 1497. 93 5930447.42 666719.54 4.00 6593.77 102.24 MWD
14525.00 88.31 137.97 8950.94 -9159.28 1514. 82 5930429.38 666736.83 4.00 6618.73 102.21 MWD
14550.00 88.10 738.95 8951.72 -9177.98 1531. 39 5930411.05 666753.80 4.00 6643.71 102.19 MWD
14575.00 87.89 139.93 8952.60 -9196.97 1547. 64 5930392.43 666770.46 4.00 6668.70 102.16 MWD
14600.00 87.68 140.91 8953.56 -9216.22 1563. 56 5930373.53 666786.79 4.00 6693.68 102.12 MWD
14625.00 87.47 141.88 8954.62 -9235.74 1579. 14 5930354.36 666802.80 4.00 6718.65 102.08 MWD
14650.00 87.27 142.86 8955.76 -9255.52 1594. 39 5930334.92 666818.47 4.00 6743.60 102.04 MWD
14675.00 87.06 143.84 8957.00 -9275.55 1609. 29 5930315.22 666833.81 4.00 6768.52 102.00 MWD
14700.00 86.85 144.82 8958.33 -9295.83 1623. 85 5930295.26 666848.81 4.00 6793.42 101.95 MWD
14725.00 86.65 145.80 8959.75 -9316.35 1638. 05 5930275.05 666863.46 4.00 6818.27 101.90 MWD
14750.00 86.44 146.78 8961.26 -9337.11 1651. 90 5930254.60 666877.75 4.00 6843.07 101.84 MWD
14775.00 86.24 147.76 8962.85 -9358.10 1665. 39 5930233.92 666891.70 4.00 6867.82 101.78 MWD
14800.00 86.03 148.75 8964.54 -9379.31 1678. 51 5930213.00 666905.28 4.00 6892.51 101.72 MWD
14825.00 85.83 149.73 $966.31 -9400.74 1691. 26 5930191.86 666918.50 4.00 6917.12 101.65 MWD
14850.00 85.63 150.71 8968.17 -9422.38 1703. 65 5930170.50 666931.35 4.00 6941.65 101.58 MWD
14875.00 85.43 151.69 8970.12 -9444.22 1715. 65 5930148.92 666943.83 4.00 6966.10 101.51 MWD
14900.00 85.24 152.68 8972.15 -9466.26 1727. 28 5930127.15 666955.94 4.00 6990.46 101.43 MWD
14925.00 85.04 153.66 8974.27 -9488.49 1738. 52 5930105.17 666967.66 4.00 7014.71 101.35 MWD
14950.00 84.85 154.65 8976.47 -9510.90 1749. 38 5930083.01 666979.01 4.00 7038.86 101.27 MWD
14975.00 84.65 155.63 8978.76 -9533.49 1759. 85 5930060.65 666989.97 4.00 7062.89 101.18 MWD
15000.00 84.46 156.62 5981.13 -9556.24 1769. 92 5930038.12 667000.53 4.00 7086.80 101,09 MWD
15025.00 85.06 155.91 8983.42 -9579.04 1779. 93 5930015.56 667011.04 3.71 7110.69 310.13 MWD
15050.00 85.69 155.13 8985.44 -9601.72 1790. 25 5929993.11 667021.86 4.00 7134.70 309.07 MWD
15075.00 86.32 154.35 8987.18 -9624.27 1800. 90 5929970.80 667032.99 4.00 7158.82 309.13 MWD
15100.00 86.95 153.57 8988.64 -9646.69 1811. 85 5929948.62 667044.43 4.00 7183.04 309.19 MWD
15125.00 87.59 152.80 8989.84 -9668.98 1823. 12 5929926.59 667056.18 4.00 7207.35 309.23 MWD
15150.00 88.22 152.02 8990.75 -9691.12 1834. 69 5929904.71 667068.23 4.00 7231.75 309.27 MWD
15175.00 88.85 151.25 8991.39 -9713.11 1846. 56 5929882.98 667080.58 4.00 7256.23 309.30 MWD
15200.00 89.49 150.48 8991.75 -9734.95 1858. 73 5929861.42 667093.23 4.00 7280.78 309.32 MWD
15225.00 90.12 149.70 8991.84 -9756.62 1871. 20 5929840.03 667106.17 4.00 7305.39 309.33 MWD
15250.00 91.11 149.67 899t.57 -9778.19 1883. 82 5929818.74 667119.26 3.95 7330.04 358.26 MWD
" bp ~ BP Alaska i
~ Baker Hu hes INTE Plannin Re ort
g Q g P
sa~ ~r
~s
INTEQ
Compaoy: BP Amoco Date: 5/17/2007 Time: 14:27:51 Page: 5
Field: Prudhoe Bay Co-ord ieate(NE}Reference: Well: X-30, True North
Site: PB X Pad Vertical (TVD) Reference: 40 : 30 4/11/1995 00:00 70.1
WeiL• X-30 Section (VS) Reference: Site (-2126.61N,-400.89E,140.OOAzi)
Wetlpath: Pla n 9, X-30A Sarvey Caic~tatioo Met6od: Minimum Gurvature ` Db: Orade
Survey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS 1'FO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
15275.00 92.11 149.67 8990.87 -9799.76 1896.44 5929797.45 667132.34 4.00 7354.67 360.00 MWD
15300.00 93.11 149.67 8989.73 -9821.32 1909.05 5929776.17 667145.42 4.00 7379.29 0.00 MWD
15325.00 94.11 149.67 8988.16 -9842.86 1921.65 5929754.92 667158.49 4.00 7403.88 0.00 MWD
15350.00 95.11 149.67 8986.15 -9864.36 1934.23 5929733.69 667171.54 4.00 7428.45 360.00 MWD
15360.97 95.54 149.67 8985.14 -9873.79 1939.74 5929724.39 667177.26 4.00 7439.21 0.00 MWD
15375.00 94.98 149.67 8983.85 -9885.85 1946.80 5929712.49 667184.57 4,00 7452.99 180.00 MWO
15400.00 93.98 149.67 8981.89 -9907.36 1959.38 5929691.26 667197.62 4.00 7477.56 180.00 MWD
15425.00 92.98 149.67 8980.38 -9928.90 1971.98 5929670.00 667210.69 4.00 7502.16 180.00 MWD
15450.00 91.98 149.67 8979.29 -9950.46 1984.59 5929648.73 667223.77 4.00 7526.78 180.00 MWD
15475.00 90.98 149.67 8978.65 -9972.03 1997.21 5929627.44 667236.86 4.00 7551.41 180.00 MWD
15500.00 89.98 149.67 8978.43 -9993.61 2009.84 5929606.14 667249.95 4.00 7576.06 180.00 MWD
15505.97 89.74 149.67 8978.45 -9998.76 2012.85 5929601.06 667253.08 4.00 7581.94 180.00 MWD
15525.00 89.74 148.91 8978.53 -10015.12 2022.57 5929584.91 667263.15 4.00 7600.72 270.00 MWD
15550.00 89.75 147.91 8978.64 -10036.42 2035.66 5929563.91 667276.71 4.00 7625.45 270.00 MWD
15575.00 89.75 146.91 8978.76 -10057.48 2049.13 5929543.15 667290.63 4.00 7650.24 270.01 MWD
15600.00 89.75 145.91 8978.87 -10078.31 2062.96 5929522.63 667304.91 4.00 7675.09 270.01 MWD
15625.00 89.75 144.91 8978.98 -10098.89 2077.15 5929502.37 667319.55 4.00 7699.97 270.02 MWD
15650.00 89.75 143.91 8979.09 -10119.22 2091.70 5929482.37 667334.54 4.00 7724.90 270.02 MWD
15675.00 89.75 142.91 8979.20 -10139.29 2106.60 5929462.62 667349.87 4.00 7749.85 270.03 MWD
15700.00 89.75 141.91 8979.31 -10159.10 2121.85 5929443.15 667365.55 4.00 7774.83 270.03 MWD
15725.00 89.75 140.91 8979.42 -10178.64 2137.44 5929423.96 667381.57 4.00 7799.82 270.03 MWD
15750.00 89.75 139.91 8979.53 -10197.91 2153.37 5929405.05 667397.92 4.00 7824.82 270.04 MWD
15775.00 89.75 138.91 8979.64 -10216.89 2169.64 5929386.43 667414.59 4.00 7849.82 270.04 MWD
15800.00 89.75 137.91 8979.75 -10235.59 2186.23 5929368.10 667431.59 4.00 7874.81 270.05 MWD
15825.00 89.75 136.91 8979.86 -10254.00 2203.15 5929350.07 667448.91 4.00 7899.78 270.05 MWD
15850.00 89.75 135.97 8979.97 -10272.10 2220.39 5929332.35 667466.53 4.00 7924.73 270.06 MWD
15875.00 89.75 134.91 8980.07 -10289.91 2237.94 5929314.93 667484.47 4.00 7949.65 270.06 MWD
15900.00 89.75 133.91 8980.18 -10307.40 2255.80 5929297.83 667502.70 4.00 7974.53 270.07 MWD
15925.00 89.76 132.91 8980.29 -10324.58 2273.96 5929281.06 667521.23 4.00 7999.37 270.07 MVND
15950.00 89.76 131.91 8980.39 -10341.44 2292.41 5929264.60 667540.06 4.00 8024.15 270.07 MWD
15975.00 89.76 130.91 8980.50 -10357.98 2311.16 5929248.48 667559.16 4.00 8048.87 270.08 MWD
16000.00 89.76 129.91 8980.60 -10374.19 2330.20 5929232.70 667578.54 4.00 8073.52 270.08 MWD
16025.00 89.76 128.91 8980.71 -10390.06 2349.51 5929217.25 667598.20 4.00 8098.09 270.09 MWD
16030.97 89.76 128.67 8980.73 -10393.80 2354.16 5929213.62 667602.93 4.00 8103.95 270.09 MWD
16050.00 89.79 129.43 8980.81 -10405.79 2368.94 5929201.96 667617.97 4.00 8122.63 88.00 MWD
16075.00 89.82 130.43 8980.89 -10421.83 2388.11 5929186.33 667637.48 4.00 8147.25 88.00 MWD
16100.00 89.86 131.43 8980.96 -10438.21 2407.00 5929170.37 667656.72 4.00 8171.93 87.99 MWD
16125.00 89.89 132.43 8981.02 -10454.92 2425.60 5929154.08 667675.68 4.00 8196.69 87.99 MWD
16150.00 89.93 133.43 8981.06 -10471.95 2443.90 5929137.46 667694.35 4.00 8221.50 87.99 MWD
16175.00 89.96 134.43 8981.08 -10489.29 2461.91 5929120.51 667712.73 4.00 8246.36 87.99 MWD
16200.00 90.00 135.43 8981.09 -10506.95 2479.61 5929103.25 667730.81 4.00 8271.26 87.99 MWD
16225.00 90.03 136.43 8981.08 -10524.91 2496.99 5929085.67 667748.59 4.00 8296.19 87.99 MWD
16250.00 90.07 137.43 8981.06 -10543.17 2514.07 5929067.79 667766.06 4.00 8321.16 87.99 MWD
16275.00 90.10 138.43 8981.02 -10561.73 2530.82 5929049.61 667783.21 4.00 8346.14 87.99 MWD
16280.97 90.11 138.67 8981.01 -10566.20 2534.77 5929045.22 667787.25 4.00 8352.11 87.99 MWD
16300.00 90.14 137.91 8980.97 -10580.41 2547.43 5929031.29 667800.23 4.00 8371.13 272.00 MWD
16325.00 90.17 136.91 8980.90 -10598.81 2564.35 5929013.27 667817.54 4.00 8396.10 272.00 MWD
16350.00 90.21 135.91 8980.81 -10616.92 2581.59 5928995.54 667835.17 4.00 8421.05 272.00 MV1fD
16375.00 90.24 134.91 8980.72 -10634.72 2599.14 5928978.13 667853.11 4.00 8445.97 271.99 MWD
16400.00 90.28 133.91 8980.60 -10652.21 2617.00 5928961.03 667871.34 4.00 8470.85 271.99 MWD
16425.00 90.31 132.91 8980.47 -10669.39 2635.16 5928944.26 667889.88 4.00 8495.69 271.98 MWD
16450.00 90.35 131.91 8980.33 -10686.25 2653.62 5928927.81 667908.70 4.00 8520.47 271.98 MWD
16475.00 90.38 130.91 8980.17 -10702.79 2672.37 5928911.69 667927.80 4.00 8545.19 271.97 MWD
bp ~ BP Alaska ~
~ Baker Hu hes INTE Plannin Re ort
g Q g P
~it~
s ~s
INTEQ
Coropany: BP Amoeo Date: 5l17/2007 Tima 14:27:51 Page: 6
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well• X-30, True North
Site: PB X Pad Vertical (TVD)Referencr. 40 t 30 4/11 /1995 00:00 70.1
Well: X-30 Sectioa (~'S) Reference: Site (-2126.61N,-400.89E,140.OOAzi)
Weilpat6: Pla n 9, X-30A Survey CalculaNon Method: Minimum Gurvature Db: Oracle
Survey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO TooL
ft deg deg ft ft ft ft ft deg/100ft ` ft deg
16500.00 90.42 129.97 8980.00 -10718.99 2691.41 5928895.90 667947.19 4.00 8569.84 271.97 MWD
16525.00 90.45 128.91 8979.81 -10734.86 2710.72 5928880.46 667966.84 4.00 8594.41 271.96 MWD
16550.00 90.48 127.91 8979.60 -10750.40 2730.31 5928865.36 667986.77 4.00 8618.90 271.95 MWD
16575.00 90.52 126.91 8979.38 -10765.58 2750.16 5928850.61 668006.95 4.00 8643.30 271.94 MWD
16600.00 90.55 125.91 8979.15 -10780.42 2770.28 5928836.22 668027.39 4.00 8667.60 271.94 MWD
16625.00 90.59 124.91 8978.90 -10794.91 2790.66 5928822.18 668048.07 4.00 8691.79 271.93 MWD
16650.00 90.62 123.91 8975.64 -10809.04 2811.28 5928808.51 668069.00 4.00 8715.87 271.92 MWD
16675.00 90.65 122.91 8978.36 -10822.80 2832.15 5928795.21 668090.16 4.00 8739.83 271.91 MWD
16680.97 90.66 122.68 8978.30 -10826.03 2837.16 5928792.09 668095.24 4.00 8745.53 271.89 MWD
16700.00 90.63 121.91 8978.08 -10836.20 2853.25 5928782.27 668111.55 4.00 8763.66 267.90 MWD
16725.00 90.59 120.92 8977.81 -10849.23 2874.58 5928769.71 668133.16 4.00 8787.35 267.89 MWD
16750.00 90.56 119.92 8977.56 -10861.89 2896.14 5928757.53 668154.99 4.00 8810.90 267.8$ MWD
16775.00 90.52 118.92 8977.33 -10874.17 2917.92 5928745.74 668177.03 4.00 8834.30 267.87 MWD
16800.00 90.48 117.92 8977.11 -10886.06 2939.90 5928734.33 668199.27 4.00 8857.55 267.86 MWD
16825.00 90.45 116.92 8976.91 -10897.57 2962.09 5928723.30 668221.70 4.00 8880.63 267.85 MWD
16850.00 90.41 115.92 8976.72 -10908.70 2984.48 5928712.67 668244.33 4.00 8903.54 267.84 MWD
16875.00 90.37 114.92 8976.55 -10919.43 3007.06 5928702.44 668267.13 4.00 8926.28 267.84 MWD
16900.00 90.33 113.92 8976.40 -10929.76 3029.82 5928692.61 668290.12 4.00 8948.83 267.83 MWD
16925.00 90.29 112.92 8976.26 -10939.70 3052.76 5928683.18 668313.27 4.00 8971.18 267.82 MWD
16950.00 90.26 111.92 8976.14 -10949.23 3075.87 5928674.15 668336.58 4.00 8993.34 267.82 MWD
16975.00 90.22 110.92 8976.04 -10958.36 3099.15 5928665.53 668360.04 4.00 9015.30 267.81 MWD
17000.00 90.18 109.92 8975.95 -10967.09 3122.58 5928657.32 668383.65 4.00 9037.04 267.81 MWD
17025.00 90.14 108.92 8975.88 -10975.40 3146.15 5928649.53 668407,41 4.00 9058.56 267.81 MWD
17050.00 90.10 107.92 8975.83 -10983.30 3169.87 5928642.15 668431.29 4.00 9079.86 267.80 MWD
17075.00 90.06 106.92 8975.79 -10990.79 3193.72 5928635.19 668455.30 4.00 9100.93 267.80 MWD
17100.00 90.03 105.93 8975.77 -10997.86 3217.70 5928628.65 668479.43 4.00 9121.75 267.80 MWD
17125.00 89.99 104.93 8975.77 -11004.51 3241.80 5928622.53 668503.66 4.00 9142.34 267.80 MWD
17150.00 89.95 103.93 8975.78 -11010.73 3266.01 5928616.83 668528.00 4.00 9162.67 267.80 MWD
17175.00 89.91 102.93 8975.51 -11016.54 3290.33 5928611.56 668552.44 4.00 9182.75 267.80 MWD
17200.00 89.87 101.93 8975.86 -11021.92 3314.74 5928606.72 668576.96 4.00 9202.57 267.80 MWD
17225.00 89.83 100.93 8975.92 -11026.87 3339.25 5928602.30 668601.57 4.00 9222.11 267.80 MWD
17250.00 89.80 99.93 8976,00 -11031.40 3363.83 5928598.31 668626.25 4.00 9241.38 267.81 MWD
17275.00 89.76 98.93 8976.10 -11035.49 3388.49 5928594.76 668650.99 4.00 9260.37 267.81 MWD
17300.00 89.72 97.93 8976.22 -11039.16 3413.22 5928591.64 668675.79 4.00 9279.07 267.81 MWD
17325.00 89.68 96.93 8976.35 -11042.39 3438.01 5928588.95 668700.64 4.00 9297.49 267.82 MWD
17350.00 89.64 95.93 8976.49 -11045.19 3462.86 5928586.69 668725.54 4.00 9315.60 267.82 MWD
17375.00 89.61 94.93 8976.66 -11047.56 3487.74 5928584.87 66875U.47 4.00 9333.41 267.83 MWD
17400.00 89.57 93.93 8976.84 -11049.49 3512.67 5928583.48 668775.43 4.00 9350.91 267.83 MWD
17425.00 89.53 92.93 8977.03 -11050.99 3537.62 5928582.53 668800.41 4.00 9368.10 267.84 MWD
17450.00 89.49 91.94 8977.25 -11052.05 3562.60 5928582.02 668825.40 4.00 9384.97 267.85 MWD
17475.00 89.46 90.94 8977.48 -11052.68 3587.59 5928581.94 668850.40 4.00 9401.51 267.86 MWD
17500.00 89.42 89.94 8977,72 -11052.87 3612.58 5928582.29 668875.39 4.00 9417.72 267.87 MWD
17525.00 89.38 88.94 8977.98 -11052.63 3637.58 5928583.09 668900.38 4.00 9433.60 267.88 MWD
17550.00 89.34 87.94 8978.26 -11051.94 3662.57 5928584.31 668925.34 4.00 9449.14 267.89 MWD
17575.00 89.31 86.94 8978.56 -11050.83 3687.54 5928585.98 668950.28 4.00 9464.34 267.90 MWD
17600.00 89.27 85.94 8978.87 -11049.27 3712.49 5928588.08 668975.19 4.00 9479.19 267.91 MWD
17625.00 89.24 84.94 8979.19 -11047.29 3737.41 5928590.61 669000.06 4.00 9493.68 267.92 MWD
17650.00 89.20 83.94 8979.53 -17044.86 3762.29 5928593.57 669024.88 4.00 9507.82 267.94 MWD
17675.00 89.16 82.94 8979.89 -11042.01 3787.12 5928596.97 669049.64 4.00 9521.59 267.95 4.125
i
~
~
~
~a~d
~ ~
F ~~
gj~~ ~y
~ ~ ~a~
~~ $~a~~
~~ ~~ga~
_~
w ~~~
W XKx~
n~,+~n
J XXda
I
Q
~
Q'
W
NvuooZl (•I4~w(•I4vbs
~ I
~ egg~~'~T~o88
~ g ~ ~;z8
Y ~ 3~ Ra~~;
~ F ~ ~ ~ &;
~C ~ ~ ~ R a °~~~~
~ ` gx ~ ~ nsi
Q ~ ~ ~~m~~
a a• - g~~~~
m ~~ .J ' B 3»~~
;s a ~g ? ~~n;
., ~ , p,. .
~~ ~ ~
ij
d RR$ YIS
~M~a~A~~~~
f ~ I .. ~ I
~ ~ ._ J tl
~ i I~
F
~ i.
F ..
' ~
~ ~ F.
I
~:
i
~~~~4~!~~~~~i " ~ ae ~~se
~$~
$
°w ~ ; ;
1 .
~. ~
jfS f f
~07SO~s~i4~~~LS
~+~~,~~ssis~ssi s
e
' aossssasss
oo~osm$
- . ~ -
rj
~ ~
~
C ~
~ g
- ~i
,
g .
~~ h
! .
~ i
~ ~ ~ y
3~5 jz se:'
~~~~sBS~E~~'~'~i~ :----
~3~~e~~~~
~a
~ .x~~x~;~~x
I
~
i
~r
t
~
~
!
}
r
~
+
~
~
~
~
~
i
~
~
t ~
I
l ~
l~~I~iiiE~~~~! !
. I
~ i ~
4
T
-
~
! ~ . ? : ; 4
I kf 1'~
+ ~~ ` i
I J 1 ~~ 1
+ l +
' .
. F
. ~1 k1 .
. ~ . ' ~
.
O
N
8
3
;
~
~
a
~
>
bp ~ BP Alaska
~ Anticollision Re ort
P
~ s~a~1
Nuc~tes
INTEQ
Companyt BP Amoco Date: 5/17/2007 Time: 14:31:03 Page: 1
Field: Prudhoe Bay
Reference Site: PB X Pad Co-ordinate(NE) Reference: Well: X-30, True North
Reference Well: X-30 Vertical (1'VD) Reference: 40 : 30 4l11/1995 00: 00 70.1
Reference WeOpath: Plan 9, X-30A Db; Oracle
GLOBAL SCAN APPLIED: All wellpaths within Z00'+ 100/1000 of reference - There are ~'iseells in thes~iet~pal Plan & PLANNED PROGRAM
Interpolation Method : MD Interval: 100.00 ft Error Model: ISCWSA Ellipse
Depth Range: 12950.00 to 17675.00 ft Scan Niethod: Trav Cylinder North
Maximum Radius: 2500.00 ft Error Surface: Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 5/1 7/2007 Validated: No Version: 1
Planned From To Survey Toolcode Tool N ame
R ft
200.00 11568.00 1: MWD - Stand ard (200.00-121 MWD MWD - Standard
11627.00 12925.00 1: MWD - Standard (11627 .00-1 MWD MWD - Standard
12925.00 17675.00 Planned: Plan #9 V7 NIWD MWD - Standard
Casing Points
MD TVD Diaroeter Hole Size Name
R ft in in
17675.00 9049.99 3.188 4.125 4.125
Summary
<~___________~__ Offset Wellpst6 -- -----> Reference Offset Ctr-Ctr No-Go Aliowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
X-30,PIan 9, X-30A,PIa 1 6300.00 16300.00 0.00 432.63 -432.63 FAIL: Major Risk
PB DS 14 14-44 14-44 V4 Out of range
PB X Pad X-30 X-30 V1 1 3042.04 13043.00 8.65 525.00 -516.35 FAIL: Major Risk
PB X Pad X-30 X-30P61 V1 Out of range
PB X Pad X-33 X-33 V2 1 4910.98 14624.00 659.54 744.37 -84.83 FAIL: Major Risk
Site:
Well: Ruie Assigned: Major Risk
Wellpath: X-30,PIa n 9, X-30A,PIan #9 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+A ZI TFO-HS Casing/H~istance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
13000.00 9050.29 13000.00 9050.29 101.72 1.01 182.00 0.00 4.125 0.00 339.23 -339.23 FAIL
13100.00 9048.31 13100.00 9048.31 103.34 2.55 172.93 0.00 4.125 0.00 345.19 -345.19 FAII
13200.00 9045.64 13200.00 9045.64 102.13 4.05 162.93 0.00 4.125 0.00 342.55 -342.55 FAIL
13300.00 9042.83 13300.00 9042.83 100.63 5.52 157.37 0.00 4.125 0.00 339.10 -339.10 FAIL
13400.00 9040.01 13400.00 9040.01 99.29 7.01 153.37 0.00 4.125 0.00 336.16 -336.16 FAIL
13500.00 9037.21 13500.00 9037.21 97.50 8.48 149.37 0.00 4.125 0.00 331.88 -331.88 FAIL
13600.00 9034.43 13600.00 9034.43 95.28 9.94 145.36 0.00 4.725 0.00 326.29 -326.29 FAIL
13700.00 9031.69 13700.00 9031.69 92.62 11.36 141.36 0.00 4.125 0.00 319.42 -319.42 FAtL
13800.00 9029.01 13800.00 9029.01 89.56 12.74 137.36 0.00 4.125 0.00 311.33 -311.33 FAIL
13900.00 9026.39 13900.00 9026.39 86.11 14.06 133.36 0.00 4.125 0.00 302.08 -302.08 FAIL
14000.00 9023.84 14000.00 9023.84 82.30 15.33 129.36 0.00 4.125 0.00 291.73 -291.73 FAIL
14100.00 9021.39 14100.00 9021.39 78.14 16,53 125.36 0.00 4.125 0.00 280.36 -280.36 FAIL
14200.00 9019.19 14200.00 9019.19 79.16 18.14 125.25 0.00 4.125 0.00 284.47 -284.47 FAIL
14300.00 9018.16 14300.00 9018.16 85.59 20.14 129.17 0.00 4.125 0.00 304.67 -304.67 FAIL
14400.00 9018.52 14400.00 9018.52 91.66 22.04 133.08 0.00 4.125 0.00 323.85 -323.85 FAIL
14500.00 9020.35 14500.00 9020.35 97.35 23.83 136.99 0.00 4.125 0.00 341.89 -341.89 FAIL
14600.00 9023.66 14600.00 9023.66 102.62 25.50 140.91 0.00 4.125 0.00 358.68 -358.68 FAIL
14700.00 9028.43 14700.00 9028.43 107.44 27.03 144.82 0.00 4.125 0.00 374.11 -374.11 FAIL
14800.00 9034.64 14800.00 9034.64 111.76 28.42 148.75 0.00 4.125 0.00 388.08 -388.08 FAIL
14900.00 9042.25 14900.00 9042.25 115.58 29.65 152.68 0.00 4.125 0.00 400.54 -400.54 FAIL
15000.00 9051.23 15000.00 9051.23 118.85 30.72 156.62 0.00 4.125 0.00 411.41 -411.41 FAIL
15100.00 9058.74 15100.00 9058.74 118.51 32.54 153.57 0.00 4.125 0.00 411.44 -411.44 FAIL
15200.00 9061.85 15200.00 9061.85 117.85 34.35 150.48 0.00 4.125 0.00 410.57 -410.57 FAIL
15300.00 9059.83 15300.00 9059.83 118.61 35.98 149.67 0.00 4.125 0.00 413.89 -413.89 FAIL
15400.00 9051.99 15400.00 9051.99 119.89 37.54 149.67 0.00 4.125 0.00 418.77 -418.77 FAIL
bp ~ BP Alaska
~ Anticollision Re ort
P
~ s~ .r
~s
INTEQ
Compsny: BP Amoco Date: 5/17/2007 Time: 14:31:03 Page: 2
Field: Prudhoe Bay
Reference Site: PB X Pad Co-ordinate(NEj Reference: Well: X-30, True North
Reference Wellr X-30 Vertical (1'VD) Refereoce: 40 : 30 4/11/1995 00: 00 70.1
Reference Wellpath: Plan 9, X-30A Db: O~ade
Site:
Well: Rule Assigned: Major Risk
Wellpath: X-30,PIan 9, X-30A,PIan #9 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TF0.HS Casing/H~istance Area Deviation Waroing
~ ~ ~ ft ~ ~c dey d~ ~~ rt ~c ft
15500.00 9048.53 15500.00 9048.53 121.11 39.08 149.67 0.00 4.125 0.00 423.51 -423.51 FAIL
15600.00 9048.97 15600.00 9048.97 119.54 40.76 145.91 0.00 4.125 0.00 419.86 -419.86 FAIL
15700.00 9049.41 15700.00 9049.41 117.29 42.29 141.91 0.00 4.125 0.00 414.17 -414.17 FAIL
15800.00 9049.85 15800.00 9049.85 114.51 43.64 137.91 0.00 4.125 0.00 406.92 -406.92 FAIL
15900,00 9050.28 15900.00 9050.28 111.24 44.79 133.91 0.00 4.125 0.00 398.16 -398.16 FAIL
16000.00 9050.70 16000.00 9050.70 107.48 45.75 129.91 0.00 4.125 0.00 387.96 -387.96 FAII
16100,00 9051.06 16100.00 9051.06 110.88 47.72 131.43 0.00 4.125 0.00 399.23 -399.23 FAIL
16200.00 9051.19 16200.00 9051.19 117.18 49.97 135.43 0.00 4.125 0.00 419.16 -419.16 FAIL
16300.00 9051.07 16300.00 9051.07 121.33 51.85 137.91 0.00 4.125 0.00 432.63 -432.63 FAIL
16400.00 9050.70 16400.00 9050.70 118.15 53.03 133.91 0.00 4.125 0.00 424.17 -424.17 FAIL
16500.00 9050.10 16500.00 9050.10 114.46 53.97 129.91 0.00 4.125 0.00 414.18 -414.18 FAIL
16600.00 9049.25 16600.00 9049.25 110.29 54.65 125.91 0.00 4.125 0.00 402.73 -402.73 FAIL
16700.00 9048.18 16700.00 9048.18 105.65 55.08 121.91 0.00 4.125 0.00 389.89 -389.89 FAIL
16800.00 9047.21 16800.00 9047.21 100.57 55.25 117.92 0.00 4.125 0.00 375.73 375.73 FAIL
16900.00 9046.50 16900.00 9046.50 95.09 55.14 113.92 0.00 4.125 0.00 36Q.39 -360.39 FAlL
17000.00 9046.05 17000.00 9046.05 89.26 54.77 109.92 0.00 4.125 0.00 343.98 -343.98 FAIL
17100.00 9045.87 17100.00 9045.87 83.13 54.13 105.93 0.00 4.125 0.00 326.66 -326.66 FAIL
17200.00 9045.96 17200.00 9045.96 76.75 53.21 101.93 0.00 4.125 0.00 308.60 -308.60 FAIL
17300.00 9046.32 17300.00 9046.32 70.19 52.03 97.93 0.00 4.125 0.00 290.03 -290.03 FAIL
17400.00 9046.94 17400.00 9046.94 63.56 50.58 93.93 0.00 4.125 0.00 271.24 -271.24 FAIL
17500.00 9047.82 17500.00 9047.82 56.99 48.87 89.94 0.00 4.125 0.00 252.61 -252.61 FAIL
17600.00 9048.97 17600.00 9048.97 50.64 46.91 85.94 0.00 4.125 0.00 234.70 -234.70 FAIL
17675.00 9049.99 17675.00 9049.99 46.20 45.28 82.94 0.00 4.125 0.00 222.20 -222.20 FAIL
Site: PB X Pad
Well: X-30 Rule Assigned: Major Risk
Wellpath: X-30 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Asis Ctr-Ctr No-Go Allowable
MD TVD MD 1'VD Ref Offset TFO+AZI TFO-HS Gasing/H~istance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12999.86 9050.29 13000.00 9051.84 101.72 101.73 312.68 130.67 2.38 502.88 -500.50 FAIL
13042.04 9049.75 13043.00 9055.06 102.64 102.68 306.67 127.95 8.65 525.00 -516.35 FAIL
Site: PB X Pad
Well: X-33 Rule Assigned: Major Risk
Wellpath: X-33 V2 Inter-Site Error: 0.00 ft
Refereoce Offset Semi-Major A~cis Ctr-Ctr No-Go Allowable
MD 1'VD MD TVD Ref Offset TFO+AZI TF0.HS Cssing/H9listance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
14200.00 9019.19 13200.00 9017.34 79.16 79.42 35.32 270.07 1417.92 508.12 909.80 Pass
14230.69 9018.73 13300.00 9018.15 81.13 81.65 36.47 270.02 1336.16 520.89 815.27 Pass
14263.28 9018.38 13400.00 9020.38 83.23 84.00 37.64 269.91 1257.41 534.43 722.97 Pass
14300.00 9018.16 13500.00 9023.78 85.59 86.54 38.90 269.73 1175.64 549.28 626.37 Pass
14325.97 9018.11 13600.00 9026.85 87.20 88.57 39.74 269.55 1100.96 560.33 540.63 Pass
14373.53 9018.28 13700.00 9029.34 90.07 91.77 41.44 269.39 1031.79 578.59 453.20 Pass
14421.91 9018.79 13800.00 9034.28 92.91 95.06 43.03 269.09 973.91 596.99 376.92 Pass
14474.66 9019.75 13900.00 9035.09 95.91 98.56 45.05 269.05 924.26 616.45 307.81 Pass
14529.90 9021.19 14000.00 9037.15 98.93 102.10 47.12 268.96 878.89 636.06 242.83 Pass '
14587.33 9023.16 14100.00 9039.81 101.95 105.66 49.27 268.86 837.27 656.17 181.10 Pass
14646.81 9025.71 14200.00 9042.29 104.87 109.20 51.55 268.81 799.50 675.51 123.99 Pass
14700.OQ 9028.43 14300.00 9040.53 107.44 112.35 53.96 269.13 762.24 692.79 69.45 Pass
14768.83 9032.55 14400.00 9043.23 110.41 115.94 56.68 269.15 724.90 712.94 11.95 Pass
14832.57 9036.96 14500.00 9058.11 113.01 119.15 58.27 268.25 693.99 729.94 -35.95 FAIL
-
~ bp ! BP Alaska ~ s~~
~ Anticollision Re ort
P INTEQ
Company: $P Amoco Date: 5l17/2007 Time: 14:31:03 Page. 3
Field: Prudhoe Bay
Reference Site: PB X Pad Co-ordinate(NE) Reference: WeIG X-30, True North
Reference Well: X-30 Vertical (TVD) Refereoce: 40 : 30 4/11/1995 00:00 70.1
Reference Welipath: plan 9, X-30A Db: Oracle
Site: PB X Pad
Well: X-33 Rule Assigned: Major Risk
Welipath: X-33 V2 Inter-Site Error: 0.00 ft
Reference Offset Semi-MajorAxis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H~istance Area Deviation Warning
ft ft ft R ft ft deg deg in ft ft ft
14900.00 9042.25 14600.00 9090.10 115.58 122.01 58.50 265.82 665.93 742.78 -76.84 FAIL
14910.98 9043.17 14624.00 9098.47 115.94 122.44 58.28 265.17 659.54 744.37 -84.83 FAIL
•
•
Q ~ ~
~S s 's
m°a E
~ -
R ~
~ ~ ~~
d ~ mE
m ga ~
~ _
~~
I, . ~
.~
~
~
W
~ , ~
?,~'F.,~ n t asAi.S ~'~ ~. - ~ ~ 9i~ I~~" 2 ~ ~7e ,d ~ i~~.+~ ~ .:ak4 .E s ~ -- ~ ~"
-~a.z e ...::::: .. ~..... ::...:.. - !~S!° "~ti4.Jh......3i' ~~... ! .. ~i-~-~it ! :`.-.
mi nin ~. n, ~ i i, i i i i i i. m. i~. .uuuu nu~inuu'i, .n~~.u ur u i~uwm~'i ~ ii~i- '.
~
.
~ ~o
z~~
~
~ y ~
~ $
: a
~
Y
~
~ ~
8 ~~
„ ; "
i :
~ ~
~ _ a
s
Z o$~~ ~
o xm^'m'
<
~ ~~~~u'
° ~ ~ e
#~
~ .
X
Q S w
~ . ^ a- 8
; 5 •
~ „ • mcimE
i
w 3$~°a
U
~ 3 $
a
m ~ •
~ ~.
g Z
w ~~~~
sm~m~
~
x
~
~
s. ~~ ,~
=e a .
;_
~ ~~~~ o
s~-~
3z~sa
~ ?
i
~. ~~ m;
~ ,
~ 9
cY~
~
F 98
~ ; ~ ~
M
X
a
o <?
po S g ~ X
m ~ ~
~
(3~t~
~
I~I ;
j $ ~ t
o e ~
4
~ ~
~
-- -
's
~ ~ '
, ;
r
r
k
~' t'
_
s
; i ~
~ ,~
}
~ ~
$
t
E } _
,
! 1
F _~ T - -~{ ~ ~ Q
? o
t
~ ~ ~ ~ ! - i f
't
I ~ ~' ~-~
i r I
~
,
+ .~ I .
i ~
~~
-
- ~ ~
_ ~
_ ~i
~ ~j.
~{I
k, ~
.
g
- 8
_~~.
j h
. ~
- ~- - ~'
$ {_
-r ~.}-~
_~_i ,; g
, !
~
i
{
..
~f
~~ 14r.
~;!: e
m
; ~ ~
~ a ~
~ ~ r
I ~~`
1i 1 ~
~
. . q ~ ~~
^ . : ~_
- ~ ~
- -
- i~ ~ ~~,~ i_~
_ - -$
j ~
~
i. ~ I
S
.-~-II~
\ ~1 .
1 t
~ ' i I
`
~
,
t E ~ i $
;
~
f
i
'
~i
r -
~~. -
I
~ ~ Q
q o
v
~i
~
..
~
-
:
i
f -~
.`
r
+~
~i
r
~ , '
~. ~
, ~
~.
r ~
m
~ a -
~ - ~'
i ~ . . : i " ~
E ~ '. ~
i.
~
~
'
~'
-
- ~
C
r t k °~
~~ .
i
/ _._' _
:.. +..,
r~
µ . : ~
~ r
v
+ ~ b
8
r
}
I
k, ,
j W
"' W
t
~ ~.
k~ ,
~ $~
'~ N
s 3
, ~
~
.~ 4 r~
f ;
~i ,
~
~i~~1 ~ ~ ~ 1 ~ ~~, ; ~ f. ~~a
i
~
~a
~ ~ ~ r~,
~~
~ ~,,
~,
_ ;
,
~
s
~
. ~ _
T
~~: ~{
'
~~
~
~
. ~ ~ .i ~ ~ I 1 { ~ ~1 ~
. .1_
'
. .. ..
8
_
~
' ~. .. . -
- - -
T+ ~
t
~ ~
k ~
'i _ E 7 _ . L , _ ~ ~ ~ . : ~o
~
~` t l g
, ; $
,~ ,
i~ I q
1.1 _s
t ~I .
I+ Ii
,t-!; q
,I q
,;
j; W
~~i ~
" t ~
~I~~ ~
I~!MOOSI ~+)47~oN1~-~43~S
Welll x-soA I I 2.2s
9.23
5.00 ~
12.65 •J~
13.56 ~~-
~ ir' I 6' ;f;CG pSi . R•'~~
~
Mud Cr~ss -`
14.89 HCR ~ ~
~ C~~oke Line
16.10 ~~
~s.ss ~ -
20.04 ~
Tree Size
~
22.88
~ ~ Lu~ric~tor D= 6.3'5' with E" Otis Unicns
n~ 7 ~'lu' Annula~~xSGCt.~ps~i
; 1~ 1r,'~ SCGC ps~i. RX•~-6
-~
} . I: IE' ~cC: csi RX--~;
~~ -'~` ~' HC R
Ki'! L;~~e
' 1
~ t'1r" ^O~C ~si . RX•2a
= F:=.r
- .~ri:.
T T
r'' lr i6" 5000 F`SI ~f~C'46.:
~ 7 1.16" X 3 1;&" Flan~ed Aa2pter
~~ Swab Valve
SSV
Master Valve
I •~ ~~ ~ ~' _JJ
26.68 _•
rLock Down Screws
31.00 ~ Ground Level
, Alaska Department of Natural Resources Land Administration System
~ ~
~ ~ # ~~ ~ , :
, ...,
° ` ~ ~~,~~~ ~' ~ "~:~-Ct~~s S~~rch State Cabins
~.u,~ .~. . ..,:~~~ < ~~ ,.~ _..... .
~~c"'~S~c"~ Q~~. ~c'l~~ ,~~3-Str+'~Ct
File Type: p-~~ ~; File Number: 47475 ~
See Township, Range, Section and Acreage?
~ Yes ~' No
Page 1 of 12
P~~ur~~ s~r~~rc~s
~ Printable Case File._Abstract
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
, Alaska Department of Natural Resources Land Administration System
~ ~
Page 2 of 12
http://www.dnr. state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1 /2007
, Alaska Department of Natural Resources Land Administration System
~ ~
Page 3 of 12
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
Alaska Department of Natural Resources Land Administration System Page 4 of 12
~ ~
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
, Alaska Department of Natural Resources Land Administration System Page 5 of 12
+~ i
http://www.dnr.state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1 /2007
Alaska Department of Natural Resources Land Administration System Page 6 of 12
~ ~
http://www.dnr. state.ak.us/las/Case_Abstract. cfm?FileType=ADL&FileNumber=47475 &La... 6/1 /2007
Alaska Department of Natural Resources Land Administration System
~ ~
Page 7 of 12
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
, Alaska Department of Natural Resources Land Administration System
~ ~
Page 8 of 12
http://www.dnr.state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1 /2007
, Alaska Department of Natural Resources Land Administration System
~ ~
Page 9 of 12
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
, Alaska Department of Natural Resources Land Administration System Page 10 of 12
~ ~
http://www.dnr.state.ak.us/las/Case Abstract.cfin?FileType=ADL&FileNumber=47475&La... 6/1/2007
, Alaska Department of Natural Resources Land Administration System Page 11 of 12
~ ~
http://www.dnr. state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1 /2007
. Alaska Department of Natural Resources Land Administration System Page 12 of 12
~ ~
http://www.dnr.state.ak.us/las/Case Abstract.cfm?FileType=ADL&FileNumber=47475&La... 6/1/2007
6050000
6000000
5950000
5900000
~
5850000
400000
500000 600000 700000
800000
~
s~~
~
Terri L. Hubble
BP Exploration AK Inc.
PO Box 196612 MB 7-5
Anchorage, AK 99519
PAY TO THE ~ 1 JJ~~
~~
ORDER OF .'/w'
\ Il
VlJ
First National Bank Alaska
Anchorage, AK 99501
MEMO_ ~__~~
~
89-6/1252 337
"Mastercard Check"
DATE ~S~ °~S ~ ~ ~
$ S ~~.~. . `~D
. ~
~:L25200060~:991462Z7L556~~' 033?
LJ
~
TRAiYSMi~"I'AL LE~'TER CH~CKLIST
WELL 1VAl~tE /~,C~L~ ,,~~ .~OA
PTD# ~O .~D ~~~
/ Development Service Exploratory Stratigraphic Test
Yoa-Conventio~a[ WeU
Circte 4ppropriate Letter / Paragraphs to be tnctuded ia Traasmittat Letter
! CHECK f ADD-OiYS
~ WHAT ~ (OPT[ONS)
APPLIES I
T'EJCT FOR APPROVAL LETTER
I MliLTI LAT'ERAL ~ The permit is For a aew weilbore segment of existing ;
~([f last two digits ~ well ~
in I
permit Yo. , AP[ No. ~0-
~ API number are ; '
, between 60-69) ~ Production ~hou[d continue to be reported as a funetion of the ~
i
~ original 4PI number stated aGove. ~
~
i PILOT HOLE i[n accorda~ce with 20 A.4C 2~.00~(~, all record~, data and lo~s ~
j ~ acquired for the pilot hole must be clearly differentiated in both ~
i ; weil nazne ( Pf~ and API number ~
~
~ '(~a- - -_~ from records, data and (ogs ~
~
acquired for wetl '
~ SPACING The permit is approved subject tv full compliacice with 20 AAC
! EXCEPTION ~ 25.0~~. Approval to perforate and produce / inject is contingenr i
i
I I upon issuance of a conservation order approving a spacing i
! exception
'
~ . assumes the
~ liability of any protest to rhe spacing exception rhat may occur. i
~
; DRY DCTCH ~ All dry ditch saunple sets subrnitted to the-Eommission must be in ;
i SA.tiIPLE i no greater than 30' sample intervals from below tlie permaCrosr or ;
~ I from where samptes are first caught and t0' sample intervals ;
; ~ through target zones. ;
~
!
' Non-Conventionai ~ Please note the fo[lowing. special condition of this permit: ~
production or production testing of coa! bed methane is not allowed i
wet1 I for (tiame of wetl) untit after (Cornpany Namc) ttas designed and !
~~mplemeatcd a water wel( testing progrartl to provide baseline data
I
; on water quality and quantity. _~Company Name) must contact the
~ Commission to obtain advance approva! of such water we~l testing ;
~
program. ~
Rev: 1'2~i06
C:'jody~transmitta! checkli;t
~~ . ~t. ` ~.. '. . _ ,.. ~
.,~ ., •~ ~ , ~n~, i , .i;°~~.< rr ~r.<
Field & Pool PRUDHOE BAY, PRUDHOE OIL - 64~150 _ Well Name: PRUDHOE BAY UNIT X-30A Program Well bore seg ^
PTD#:2070780 Company BP EXPLORATION fALASKA) INC _ _ Initial ClasslType 11-0IL _. GeoArea 890 Unit 11650 OnlOff Shore On Annular Disposal ^
Administration 1 Permitfeeattached_______________________________ ____________Yes_
- -
2 Leasenumberappropriate________________________ _.____Yes_.__ ___________
~
3 Uniquewell_nameandnumber -- -----~ ---- - - -- ---- -- Yes- - - -- - - - -- ----- --- - -~-- - -- -- ----- - -
4 Well locat_ed in a.define_d,pgol_ _ _ _ _ . _ _ . _ Yes _ _ _ _ _ _ _ Pr_udhoe Bay Field - Prudhoe,Bay Pool. _ , _ _ _ _ _
-
5 Well located p[oper distan~e from drilling unitbounda_ry_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . . _ _ _ _ _ _ _ _
6 Welllocatedproperdistancefromotherwells_________________ ____________ Yes___ _
-
7 Sufficientacreage.avail_ablein.drillingunit_______________ ___ ___________ Yes__._ _____„___,___________,__________
- -- -
8 If_deviated,is_wellboreplatincluded__________________ ___ __________ Yes____ ___...____________.__________________ _ __
!9 Operator only affected party_ , _ _ _ _ _ . .
-
- Yes
- - - - - - - - -
10 Operatorhas_appropnafebondinfor~e____________________ ____________ Yes____ ___Bl~nketBond#61941~3___._______,____._______
~------ ----- ------~--
11 Permitcanbeissuedwithoutconserva_tionorder______ _________ ___ Yes___ ____________________
- -
Appr Date 12 Pe[mit_ can be issued w_ithout administrative_approyal _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ , _ _ _ _
~ -
ACS 61512007 13 Can permit be approved before 15tiay wait Yes
14 Well located within area and_strata authoriz~d by_ Injection O[det # (put 10# in_comments)_ (For_ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- - -
15 All wells_within 114_mile area of reyiew identified (Fot service well onlX)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
----------- - --~ ------ -
16 Pre-produced injector duration_of prep[oducti9n I_ess than 3 mon.ths (For_service well only) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- - -
17 Nonconven,gasconformsloA$31:05:030(j.1_.A),(1.2.A-D~---- .--- ----------- NA----- -.---.-------------------------- - -
Engineering 18 Conducto[string_provided_____________________________ ____________ N_A_____ ___~onductor_insta_IledinX,30_(1.95-041),___._______._________.__.._
~9 Surfaceca&ingprQtectsall_knownUSDWs___________________ _______ ____ NA_____ __.Allaquifersexempted,,AE01._._________.______,__________ __,________ _
20 CMT.vol adequate_to ciCCUlate_on copductgr & surf_csg _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ . . _ _ _ $urf_ace casing instal_led in X-30._ . _ _ _ _ ,
- -- - -
21 CMT_voladequate_totie-inlongstringtosu_rfag___.__________ _______ ____ NA_____ __ Production_casinginstalledin_X-30.______.______________________.,________.___
22 CMT_willcoyer,allknown.protluctivehorizons_____________ ____ _____________Y_es__._ ._ _______.__
-
23 Casingdesignsadequatefo[C,T,B&_permaf[ost----.--------- ----------- Yes--- ----------------------- -------------.--------- -
24 Adequate tan_kage_or resQrue pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , . _ _ _ _ _ Yes . _ . _ _ _ _ Rig is_equipped with steel_p~s. _ No reserve_pit_planned. All waste to_approyed disposal well(s). _ _ _ _ _ _ . _
-
25 If_a, re-drill, has_a 10-403 for abandonment been approved _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ Yes _ _ _ _ _ _ _ 307-177 approved 5131/07. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
- -
26 Ad~quate wellbore separ~tion_proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ . _ _ _ _ _ Proximity analysis perfo[med, Nearest segment is abandoned porlioq of X,30._ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ .
.._
27 Ifdivederrequired,doesitmeetregulations__,.______________ ____________ NA ____ ,__BOPstackwillalready,beinplace,____,_______.________._
-
Appr Date 28 Drilling fluid_prpgram schematic.& equip list adequ~te_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes. _ _ _ , _ , Maximum expected fo[matign pr~ssu[e 7,5_EMW: Planned MW 8,7_ppg._ _ _ _ _ .
TEM 6/13/2007 29 _B_OPEs,_dotheymeetregulation.------- _. Yes---- ------_---------------_-----__ ------_ - _ -
30 BOPE_press rating appropnate; test to_(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ . MASP calculated at 2520psi, 3500_psi_ BOP testplanned. _ _ . , _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _
~~~ 31 Choke_manifold complies w/APl_ RP•53 (May 84)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ , _ _ _ _ _ , .
32 Work will occur without operation shutdown_ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ Yes _ . _ _ _ _ _ _
-
, 33 I~ pr~sence of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ye~ _ _ _ _ _ _ _ H2S is repo[ted,at Xp~d. _ Mud_should precl~ade H2S on tig._ Rig h~s &ensors and_alarm~. _ _ . _ _ _ _ _ _ _ _ _ , _ _
34 Mechanical_condition of wells within AOR verified (For se[vice well only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ N_A_ _ _ _ _ _ . , ,
-
Geology 35 Permit can be issued w!o hyd[ogen_ suifide measu[es _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _ ~rlaximum H2s on_X pad_is 150ppm;_Maximum_ reco_rded N2S on w~il X•30 was 1_0_ppm.on 4,11,2005. _ _ . _ . , _ _
36 Da~a_presented on poten~ial oyerpressu[e zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . NA_ _ _ _ _ _ _ _
-
Appr Date
37
Seismic_analysis of shallqw gas_zones_ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ . _
_ _ _ _ . . . . _ _ NA_ _ _ _ _ - - -
_ _ , _
- -
ACS 61512007
38
SegbedconditionsurYey,(ifoff_•&hore}_______________________
___________ NA____ -
-- - -
39 Contact namelphone for week_ly_progress repo(ts_ [exploratory only] _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ . _ _ _ _ _ Greg Sarber_- 564-4330_ _ _
Geologic Date: Engineering Date P~~
' Date
Commissioner, Commissioner: m i r
~T~ 6l'~ ~ ~'~~~-- ~-~¢.~, ~~~ ^a
~
~
~
~ i
Well I-iistory File
APPE~IDIX
Information of detailed nature that is not
particula~iy geRnane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Weli History file and to
sim.plify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effori has been made to chronologically .
organize this category of information.
. ~ ~
**** REEL HEADER ****
MWD
08/10/20
BHI
Ol
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/10/03
1563395
O1
3.0" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
~Version Information
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. N0: One line per frame
~Well Information Block
#MNEM.UNIT Data Type Information
#--------- ------------- -------------------------------
STRT.FT 12850.0000: Starting Depth
STOP.FT 14275.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: X-30A
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 14' 28.122"N 148 deg 40' 2.052"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 03 Oct 2007
API . API NUMBER: 500292255001
~Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 07 .
TOWN.N T10N .
RANG. R14E .
PDAT. MSL .
EPD .F 0 .
LMF . KB .
FAPD.F 70.1 .
DMF . KB .
EKB .F 0 .
EDF .F 70.1 .
EGL .F 0 .
CASE.F N/A .
OSl . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
{1) All depths are Measured Depths (MD) unless otherwise noted.
~~~ -o~ ~ 1~-~vs
(2}
(3)
(4)
(5)
Advantage
~
All depths are Bit Depths unless
All True Vertical Depths (TVDSS)
All Formation Evaluation data is
Baker Hughes INTEQ utilized Coil
~
otherwise noted.
are SubSea corrected.
realtime data.
Prak downhole tools and the
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to a PDC
(Primary Depth Control)
log provided by Schlumberger CH GR dated OS Oct 2007 per poug
Dortch with
BP Exploration (Alaska), Inc.
(8) Tied to X-30APB1 at 12861 feet MD (8972 feet TVDSS).
(9) The sidetrack was d rilled from X-30 off the whipstock set at 12876
feet M D
(8972 feet TVDSS) through a 5 1/2 inch liner.
Top of window 12880 ft.MD (8973 ft.TVDSS)
Bottom of window 12889 ft.MD (8973 ft.TVDSS)
(10) Baker Hughes INTEQ runs 1 and 2 were used to mill up fast plugs and
set a
permanent whipstock .
(11) Baker Hughes INTEQ runs 5 through 10 were used to drill, set an
alumin um billet
and fish the bottom hole assembly with the X-30APB1 and X-30APB2
wells.
(12) The open-hole sidetrack was drilled from X-30APB1 at 12973 feet MD
(8978 feet TVDSS).
(10) The interval from 1 4288 feet to 14320 feet MD (8984 feet to 8984
feet T VDSS) was not logged
due to sensor to bi t offset at well TD.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Pene tration, feet/hour
RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
TVD -> True Vertica l Depth (Subsea)
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
12872.1, 12864.9, ! -7.16602
12880, 12874.5, ! -5.5127
12883.7, 12877.4, ! -6.24805
12888.4, 12883.6, ! -4.76758
12889.6, 12885.5, ! -4.14648
12891.1, 12887.1, ! -3.93945
12951.4, 12952.3, ! 0.918945
12956, 12956.7, ! 0.735352
13007, 12998.6, ! -8.45312
13013.8, 13006.1, ! -7.71777
13069, 13069.9, ! 0.917969
13071.6, 13072, ! 0.367188
13083.7, 13081, ! -2.75684
13162.9, 13163.4, ! 0.551758
13167.8, 13168.2, ! 0.367188
13170.8, 13170, ! -0.734375
13236, 13236.5, ! 0.550781
13247.9, 13248.1, ! 0.183594
13282.7, 13285.6, ! 2.94043
~
13286.2, 13288.2, ! 2.02148
13314.2, 13313.3, ! -0.918945
13322.1, 13322.5, ! 0.368164
13327.3, 13329.2, ! 1.83789
13335, 13335, ! 0
13336, 13338.2, ! 2.20508
13338.2, 13340.8, ! 2.57227
13341.7, 13344.1, ! 2.38867
13346.3, 13346,8, ! 0.551758
13350.9, 13351,4, ! 0.551758
13359.5, 13356.9, ! -2.57227
13391, 13392.3, ! 1.28711
13394.8, 13395.3, ! 0.550781
13403.5, 13403.1, ! -0.368164
13407.7, 13407.2, ! -0.551758
13411.3, 13411.9, ! 0.550781
13420.2, 13421.7, ! 1.46973
13425.6, 13426.9, ! 1.28613
13439.9, 13440.1, ! 0.18457
13448.4, 13443.4, ! -4.96094
13452.6, 13447.8, ! -4.77734
13466.8, 13462.4, ! -4.41016
13469.9, 13464.6, ! -5.32812
13475.8, 13469.9, ! -5.88086
13479.7, 13475.4, ! -4.22656
13484.4, 13480, ! -4.41016
13488.7, 13483.1, ! -5.5127
13490.7, 13484.4, ! -6.24707
13493.4, 13487.2, ! -6.24805
13498, 13493.8, ! -4.22656
13501.9, 13497.3, ! -4.59375
13505.4, 13500.1, ! -5.32812
13507.2, 13502.1, ! -5.14551
13539.7, 13533.8, ! -5.87988
13545, 13538.4, ! -6.61523
13548.7, 13543.3, ! -5.32812
13550.3, 13545.5, ! -4.77734
13552.3, 13547.4, ! -4.96191
13554.2, 13549.2, ! -4.96094
13556.4, 13551, ! -5.3291
13558.6, 13554, ! -4.59375
13560.4, 13555.3, ! -5.14551
13574.4, 13570.3, ! -4.04199
13576.5, 13573.9, ! -2.57227
13580.5, 13576.5, ! -4.04297
13588.4, 13582, ! -6.43164
13590.6, 13586.6, ! -4.04297
13593.6, 13589.4, ! -4.22656
13595.2, 13590.8, ! -4.41016
13598.6, 13594.3, ! -4.22656
13600.4, 13596.3, ! -4.04297
13610.5, 13610.9, ! 0.367188
13612.7, 13613.5, ! 0.735352
13619.5, 13618.3, ! -1.28613
13672.7, 13667.2, ! -5.5127
13676.6, 13671.2, ! -5.32812
13677.7, 13672.5, ! -5.14453
13678.4, 13674.2, ! -4.22656
13681.7, 13676.6, ! -5.14551
13683.7, 13678.6, ! -5.14551
13686.7, 13681.3, ! -5.3291
13689.2, 13684.1, ! -5.14551
13692.7, 13687.8, ! -4.96094
13694.6, 13690.3, ! -4.22656
13702.1, 13699.9, ! -2.20508
13704.3, 13701.5, ! -2.75586
13709.3, 13705.6, ! -3.6748
~
~
13720.8, 13718.8, ! -2.02148
13730, 13725.1, ! -4.96191
13733.7, 13729.1, ! -4.59375
13737.9, 13732.4, ! -5.5127
13739.9, 13734.6, ! -5.32812
13744.7, 13739.9, ! -4.77832
13747.1, 13742, ! -5.14551
13758.7, 13754.8, ! -3.8584
13763.3, 13759.6, ! -3.6748
13765.1, 13761.6, ! -3.49121
13769.7, 13764.4, ! -5.3291
13771.4, 13765.9, ! -5.5127
13773.5, 13768.7, ! -4.77832
13776.8, 13771.5, ! -5.3291
13779.6, 13774.1, ! -5.5127
13785.3, 13779.2, ! -6.06348
13787.8, 13782, ! -5.88086
13790.2, 13784.5, ! -5.69629
13794.5, 13788.2, ! -6.24805
13797.4, 13792.4, ! -4.96094
13806.6, 13799.3, ! -7.35059
13815.8, 13809.4, ! -6.43164
13818.6, 13813.1, ! -5.5127
13822.8, 13816.7, ! -6.06348
13825.9, 13819.9, ! -6.06445
13832.2, 13824.8, ! -7.35059
13835.1, 13827.1, ! -8.08496
13838.1, 13829.6, ! -8.45312
13843.4, 13835.5, ! -7.90234
13845.2, 13837, ! -8.26855
13848.6, 13844.3, ! -4.22656
13852, 13846.7, ! -5.32812
13856,1, 13850.6, ! -5.5127
13860.5, 13855.3, ! -5.14551
13863.3, 13858.5, ! -4.77739
13865.8, 13860.9, ! -4.96191
13870.4, 13863.4, ! -6.98242
13891.4, 13888.8, ! -2.57324
13899.8, 13896.3, ! -3.49121
13912.1, 13904.2, ! -7.90137
13916.9, 13908.8, ! -8.08594
13928.8, 13923.9, ! -4.96094
13933.4, 13929.4, ! -4.04297
13943, 13938.7, ! -4.22656
14040.3, 14036.5, ! -3.85938
14042.9, 14038.8, ! -4.04297
14046.7, 14041.6, ! -5.14551
14049.7, 14043.4, ! -6.24707
14060.3, 14056.7, ! -3.6748
14073.7, 14070.6, ! -3.12402
14083.3, 14079.4, ! -3.8584
14085.5, 14082.3, ! -3.12305
14087.5, 14084.5, ! -2.93945
14091.3, 14088.8, ! -2.57324
14098.7, 14096.3, ! -2.38867
14100.5, 14098, ! -2.57227
14103.6, 14101.3, ! -2.38867
14104.9, 14103.1, ! -1.83789
14108.6, 14105.9, ! -2.75586
14110.6, 14107.7, ! -2.94043
14114.5, 14111.8, ! -2.75684
14116.3, 14113.4, ! -2.93945
14119.5, 14116.5, ! -2.94043
14121.1, 14118.2, ! -2.94043
14127.2, 14123.9, ! -3.30762
14130.5, 14127.9, ! -2.57227
14134.9, 14131.6, ! -3.30762
~
~
14137.1, 14133.4,
14139.3, 14135.1,
14146.1, 14142.1,
14149.2, 14144.1,
14150.7, 14146.5,
14152.2, 14147.8,
14154.2, 14149.4,
14156.8, 14153.3,
14158.1, 14155.3,
14161.7, 14158.4,
EOZ
END
-3.6748
-4.22656
-4.04297
-5.14551
-4.22656
-4.41016
-4.77734
-3.49219
-2.75684
-3.30762
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD .001
1024
243 records...
10 bytes
132 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN X-30A 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN X-30A
APIN
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
CJ
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
from Schlumgerger dated 08 Oct 2007 per poug Dortch with
BP Exploration (Alaska), Inc.
*** INFORMATION TABLE: CIFO
MNEM
----- CHAN DIMT
------
------ CNAM
--------- ODEP
GR ------
GR --
GRAX ------------------
0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
~
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= ~)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
3 RAD MWD 68 1 OHMM
4 RAS MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 RPS MWD 68 1 OHMM
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Total Data Records: 80
Tape File Start Depth = 12850.000000
Tape File End Depth = 14275.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD .002
1024
93 records...
54 bytes
4124 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN X-30A.xtf
LCC 150
CN BP Exploration (Alaska)
WN X-30A
APIN
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
~
•
~
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field MWD data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 158
Tape File Start Depth = 12857.750000
Tape File End Depth = 14275.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 171 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/10/03
~~
1563395
01
**** REEL TRAILER ****
MWD
08/10/20
BHI
O1
Tape Subfile: 4 2 records...
•
Minimum record length: 132 bytes
Maximum record length: 132 bytes
n
U
~
U
Tape Subfile 1 is type: LIS
~
Tape Subfile 2 is type: LIS
DEPTH GR ROP
RPD RPS
12850.0000 -999.2500 -999.250C
-999.2500 -999.2500
12850.5000 -999.2500 -999.250C
-999.2500 -999.2500
12900.0000 34.2714 39.851C
~.2826 8.8415
13000.0000 37.4336 47.210~
5.4643 5.6863
13100.0000 28.7413 103.4888
3.5535 3.3789
13200.0000 23.9794 70.299E
4.4180 4.0330
1330~.~00~ 29.5362 137.1718
9.9969 10.2452
13400.0000 71.6022 278.349A
11.2400 9.9142
13500.0000 168.1689 114.0069
8.6639 6.7383
13600.0000 34.4477 58.4949
14.8905 14.9729
13700.0000 45.0392 113.9651
12.4683 13.2799
13800.0000 38.8181 117.6611
12.0232 12.4232
13900.0000 44.5210 120.4516
14.0568 16.5420
14000.0000 34.6734 113.5538
11.4420 13.6160
14100.0000 60.6841 50.5331
8.4795 9.0454
14200.0000 37.2400 30.8400
14.9837 16.2298
14275.0000 -999.2500 77.2766
4.1644 6.2301
Tape File Start Depth = 12850.000000
Tape File End Depth = 14275.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
•
RAD
-999.2500
-999.2500
4.0253
5.4672
4.1451
5.5139
10.85~0
14.0057
13.3256
13.3122
8.8932
9.8339
8.8746
7.7512
8.8070
8.2470
4.6337
RAS
-999.2500
-999.2500
5.7348
5.6942
3.7816
4.8229
11.2656
14.0078
11.9569
16.2530
13.3661
13.3061
12.5630
11.8293
9.3506
21.1100
3.7956
~
Tape Subfile 3 is type: LIS
DEPTH GR ROP
RPD RPS
12857.7500 -999.2500 -999.250C
-999.2500 -999.2500
12858.0000 30.1000 -999.250C
-999.2500 -999.2500
12900.0000 33.0000 114.0000
6.6590 7.5900
13000.0000 28.3000 -999.2500
3.6450 3.1990
13100.0000 28.4000 101.5000
3.5320 3.3340
13200.0000 22.4000 77.3000
4.4180 4.0330
13300.0000 27.4000 94.2000
9.9020 10.0660
13400.0000 71.5000 291.6000
11.2400 9.9060
13500.0000 113.0000 124.6000
9.7100 8.1510
13600.0000 33.3000 118.0000
14.9300 15.4130
13700.0000 41.7000 119.9000
12.5360 13.9190
13800.0000 33.2000 113.3000
11.5450 12.4920
13900.0000 46.4000 119.5000
13.3950 16.1520
14000.0000 34.6000 94.7000
11.5450 13.9190
14100.0000 39.5000 34.9000
8.6680 9.1950
14200.0000 31.7000 32.5000
12.7890 15.2720
14275.0000 74.1000 76.8000
4.8500 7.0350
Tape File Start Depth = 12857.750000
Tape File End Depth = 14275.000000
Tape File Level Spacing = 0.25~0~0
Tape File Depth Units = feet
.
RAD
-999.2500
-999.2500
3.4920
4.6760
4.1660
5.5160
10.8830
14.0100
14.3180
13.3070
8.7810
9.6320
9.1350
7.5110
8.9540
8.2500
5.2280
RAS
-999.2500
-999.2500
4.9430
4.0080
3.7900
4.8220
11.2290
14.0000
12.8170
15.8670
13.2340
12.2340
12.2770
11.8980
9.4880
13.8200
4.1430
~ ~
Tape Subfile 4 is type: LIS
•
**** REEL HEADER ****
MWD
08/10/20
BHI
O1
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/09/24
1563395
O1
3.0" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!~!!!!!!!!!!! Extract File: ldwg.las
•
~Version Information
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. N0: One line per frame
~Well Information Block
#MNEM.UNIT Data Type Information
#-------- - ------------- -------------------------------
STRT.FT 12858.0000: Starting Depth
STOP.FT 13742.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: X-30APB1
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 14' 28.122"N 148 deg 40' 2.052"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 24 Sep 2007
API . API NUMBER: 500292255071
~Parameter Information Block
#MNEM,UNIT Value
#--------- -------------------------
SECT. 07 .
TOWN.N T10N .
RANG. R14E .
PDAT. MSL .
EPD .F 0 .
LMF . KB .
FAPD.F 70.1 .
DMF . KB .
EKB .F 0 .
EDF .F 70.1 .
EGL .F 0 .
CASE.F N/A .
OS1 . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
a O~- -C~~'~ l ~ ! d (o
~
~
(2) All depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (TVDSS) are SubSea corrected.
(4) Al1 Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to a PDC
(Primary Depth Control)
log from well X-30A dated 03 Oct 2007 above the KOP of 12973 feet
MD per poug Dortch with
BP Exploration (Alaska), Inc.
(8) Tie into RA Tag in X-30A at 12889 feet MD (8973 feet TVDSS).
(9) The sidetrack was drilled off a permanent whipstock from X-30 set
at 12876 feet MD
(8972 feet TVDSS) through a 5 1/2 inch casing.
Top of window 12880 ft.MD (8973 ft.TVDSS)
Bottom of window 12892 ft.MD (8974 ft.TVDSS)
(10) Baker Hughes INTEQ runs 1 and 2 were used to mill up fast plugs and
set a
permanent whipstock.
(11) The interval from 13700 feet to 13741 feet MD (8960 feet to 8958
feet TVDSS) was not logged
due to sensor to bit offset at well TD.
(12) The resisitivity interval from 13655 feet to 13688 feet MD (8962
feet to 8959 feet TVDSS)
was logged in run 5 13 hours after dilling.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Penetration, feet/hour
RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
TVD -> True Vertical Depth (Subsea)
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
12872.1, 12864.7, ! -7.46289
12879.6, 12873.6, ! -6.01172
12883.5, 12877.3, ! -6.21875
12887.9, 12883.1, ! -4.76855
12889.6, 12885.6, ! -3.93848
12891, 12886.6, ! -4.35352
12894.7, 12891, ! -3.73047
12897.8, 12894.7, ! -3.11035
12919.1, 12917.5, ! -1.6582
12932.2, 12931.2, ! -1.03613
12933.9, 12932.6, ! -1.24316
12937.8, 12937.6, ! -0.208008
12943, 12943,2, ! 0.208008
12946.9, 12947.1, ! 0.208008
12952.1, 12952.9, ! 0.829102
12953.3, 12954.2, ! 0.829102
12956, 12956.6, ! 0.62207
12960, 12959.8, ! -0.207031
12966.8, 12964.5, ! -2.28027
12971.2, 12968.9, ! -2.28027
EOZ
END
~
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 99 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
MWD .001
1024
~
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN X-30APB1 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN X-30APB1
APIN
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
from well X-30A dated 03 Oct 2007 above the KOP of 12889 feet MD
per poug Dortch with BP Exploration (Alaska), Inc.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
~
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
3 RAD MWD 68 1 OHMM
4 RAS MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 RPS MWD 68 1 OHMM
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Total Data Records: 50
Tape File Start Depth = 12858.000000
Tape File End Depth = 13742.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD .002
1024
63 records...
54 bytes
4124 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN X-30APBl.xtf
LCC 150
CN BP Exploration (Alaska)
WN X-30APB1
APIN
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
~
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field MWD data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
;~
RAD RAD RACLX
RAS RAS RACHX
RPD RPD RPCLX
RPS RPS RPCHX
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
3 RAD MWD 68 1 OHMM
4 RAS MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 RPS MWD 68 1 OHMM
Total Data Records: 99
0.0
0.0
0.0
0.0
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Tape File Start Depth = 12858.000000
Tape File End Depth = 13741.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 112 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/09/24
1563395
O1
~
**** REEL TRAILER ****
MWD
08/10/20
~ `~
BHI
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
~
~
Tape Subfile 1 is type: LIS
~
Tape Subfile 2 is type: LIS
DEPTH GR ROP
RPD RPS
12858.0000 27.5344 -999.250C
-999.2500 -999.2500
12858.5000 30.6373 -999.2500
-999.2500 -999.2500
12900.0000 34.2007 42.2412
7.2501 8.7742
13000.0000 27.3191 70.7414
3.5598 3.5520
13100.0000 31.4010 64.6412
6.8170 7.2990
13200.0000 29.5402 59.6400
6.6670 5.8910
13300.0000 27.6002 96.4402
9.6830 10.1690
13400.0000 83.9205 49.8990
11.9320 11.5780
13500.0000 57.0180 58.9211
10.9508 10.0128
13600.0000 29.0408 51.3803
14.1558 16.0986
13700.0000 -999.2500 34.9000
-999.2500 -999.2500
13742.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 12858.000000
Tape File End Depth = 13742.~00000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
~
RAD
-999.2500
-999.2500
3.9961
3.9988
7.1088
8.4458
9.7596
12.9284
13.6340
9.3522
-999.2500
-999.2500
RAS
-999.2500
-999.2500
5.6942
3.7504
6.8478
8.0542
9.9810
13.7742
13.0266
17.4366
-999.2500
-999.2500
~
Tape Subfile 3 is type: LIS
DEPTH GR ROP
RPD RPS
12858.0000 30.1000 -999.2500
-999.2500 -999.2500
12858.2500 29.7000 -999.2500
-999.2500 -999.2500
12900.0000 32.8000 114.0000
6.6590 7.5900
13000.0000 27.6000 58.2000
3.5130 3.5500
13100.0000 29.7000 71.5000
6.9590 7.3620
13200.0000 25.4000 27.0000
6.7650 6.2350
13300.0000 29.4000 86.4000
9.9290 10.5760
13400.0000 94.3000 38.8000
12.0410 11.4600
13500.0000 47.6000 55.9000
11.6120 10.8960
13600.0000 30.7000 48.1000
12.7340 15.8280
13700.0000 -999.2500 37.2000
39270.0000 9.2980
13741.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 12858.000000
Tape File End Depth = 13741.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
~
RAD
-999.2500
-999.2500
3.4920
3.9230
7.3080
8.3700
9.8210
13.1340
13.7780
8.9710
2179.3999
-999.2500
RAS
-999.2500
-999.2500
4.9430
3.6990
7.1230
7.8610
10.1140
14.1030
13.5220
13.5350
6064.5400
-999.2500
~
~
Tape Subfile 4 is type: LIS
~
**** REEL HEADER ****
MWD
O8/10/21
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/09/27
1563395
O1
3.0" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!~~!!!!!!!!!~!!!!! Extract File: ldwg.las
~Version Information
~
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. N0: One line per frame
~Well Info rmation Block
#MNEM.UNIT Data Type Information
#--------- ------------- -------------------------------
STRT.FT 12858.0000: Starting Depth
STOP.FT 13592.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: X-30APB2
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 70 deg 14' 28.122"N 148 deg 40' 2.052"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 27 Sep 2007
API . API NUMBER: 500292255072
~Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 07 .
TOWN.N T10N .
RANG. R14E .
PDAT. MSL .
EPD . F 0 .
LMF . KB .
FAPD.F 70.1 .
DMF . KB .
EKB .F 0 .
EDF .F 70.1 .
EGL .F 0 .
CASE.F N/A .
OS1 . DIRECTIONAL .
~Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
2-n~'-O~ ~ ~ 1p~'
.
~
(2) All depths are Bit Depths unless otherwise noted.
(3) Al1 True Vertical Depths (TVDSS) are SubSea corrected.
(4) All Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer pownhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to a PDC
(Primary Depth Control)
log from well X-30APB1 dated 24 Sep 2007 above the KOP of 13450
feet MD per poug Dortch with
BP Exploration (Alaska), Inc.
(8) Tie into RA Taq in X-30A at 12889 feet MD (8973 feet TVDSS).
(9) The sidetrack was drilled off a permanent whipstock from X-30 set
at 12876 feet MD
(8972 feet TVDSS) through a 5 1/2 inch casing.
Top of window 12880 ft.MD (8973 ft.TVDSS)
Bottom of window 12892 ft.MD (8974 ft.TVDSS)
(10) Baker Hughes INTEQ runs 1 and 2 were used to mill up fast plugs and
set a
permanent whipstock.
(11) Baker Hughes INTEQ runs 6 and 7 were used to set and sidetrack off
of an aluminum billet.
(12) The interval from 13448 feet to 13470 feet MD (8970 feet to 8969
feet TVDSS) was time drilled
off of an aluminum billet.
(13) The interval from 13558 feet to 13590 feet MD (8973 feet to 8972
feet TVDSS) was not logged
due to sensor to bit offset at well TD.
(12) The resisitivity interval from 13448 feet to 13470 feet MD (8970
feet to 8970 feet TVDSS)
was logqed in run 8, 14 hours after dilling.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP AVG -> Rate of Penetration, feet/hour
RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected,
ohm.m
RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected,
ohm.m
TVD -> True Vertical Depth (Subsea)
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
12865.3, 12857.7, ! -7.66992
12871.8, 12864.3, ! -7.46191
12879.7, 12873.4, ! -6.21875
12883.6, 12877.4, ! -6.21875
12887.9, 12882.8, ! -5.18164
12889.6, 12885.7, ! -3.93848
12891.1, 12887.1, ! -3.93945
12899.8, 12896.6, ! -3.10938
12907, 12904.1, ! -2.90137
12913.9, 12911.8, ! -2.07227
12919.3, 12917.5, ! -1.86523
12926.2, 12924.7, ! -1.45117
12931.8, 12930.5, ! -1.24316
12937.8, 12936.5, ! -1.24316
12943, 12942.8, ! -0.207031
12946.7, 12947.3, ! 0.62207
12951.9, 12952.7, ! 0.829102
~
12953.3, 12954.2,
12956, 12956.2,
12959.8, 12959.6,
12971, 12968.9,
12975.9, 12973.9,
12998.1, 12995.6,
13012.8, 13010.7,
13015.7, 13013.4,
13021.7, 13019.2,
13025, 13022.6,
13052.2, 13050.1,
13055.1, 13052.8,
13056.3, 13053.9,
13102, 13099.1,
13105.6, 13102.9,
13112, 13109.3,
13116.8, 13114.1,
13120.5, 13118.4,
13126.2, 13123.7,
13129.5, 13127.2,
13131.4, 13128.9,
13133.4, 13131.2,
13137, 13134.7,
13139.5, 13137.2,
13141.7, 13139.5,
13144, 13141.7,
13146.1, 13143.6,
13148.6, 13146.3,
13150, 13147.5,
13152.7, 13150.2,
13154.4, 13151.9,
13156, 13153.5,
13158.7, 13156,
13161.6, 13159.3,
13167, 13164.3,
13169.5, 13167.6,
13175.1, 13172.4,
13176.8, 13179.5,
13180.3, 13177.8,
13182.1, 13179.7,
13183.4, 13180.9,
13185.9, 13183.4,
13188.2, 13185.7,
13193.3, 13190.9,
13207, 13204.7,
13218.1, 13215.5,
13234.1, 13231.8,
13239.9, 13237.4,
13245.7, 13243.4,
13252.1, 13249.7,
13255.3, 13253,
13257.3, 13255,
13260, 13258,
13265.6, 13263.3,
13272.8, 13270.3,
13275.7, 13273.2,
13278.8, 13276.5,
13283.1, 13280.6,
13292.2, 13289.8,
13296.8, 13294.5,
13308.4, 13306.1,
13313.4, 13311.1,
13318.8, 13316.1,
13323.8, 13321.5,
13333.5, 13331.1,
13350.5, 13348.3,
13358.4, 13356.1,
0.829102
0.207031
-0.207031
-2.07324
-2.07324
-2.4873
-2.07324
-2.28027
-2.48828
-2.4873
-2.07227
-2.28027
-2.48828
-2.90234
-2.69531
-2.69531
-2.69434
-2.07324
-2.4873
-2.28027
-2.4873
-2.28027
-2.28027
-2.28027
-2.28027
-2.28027
-2.4873
-2.28027
-2.48828
-2.4873
-2.4873
-2.4873
-2.69531
-2.28027
-2.69434
-1.86621
-2.69531
-2.28027
-2.4873
-2.4873
-2.4873
-2.4873
-2.4873
-2.4873
-2.28027
-2.69531
-2.28027
-2.4873
-2.28027
-2.4873
-2.28027
-2.28027
-2.07324
-2.28027
-2.48828
-2.48828
-2.28027
-2.4873
-2.4873
-2.28027
-2.28027
-2.28027
-2.69531
-2.28027
-2.4873
-2.28027
-2.28027
~
~ ~
13370, 13367.7, ! -2.28027
13372.5, 13369.8, ! -2.69531
13376, 13373.3, ! -2.69434
13378.9, 13376.2, ! -2.69434
13382.9, 13380.4, ! -2.4873
13386.2, 13383.7, ! -2.48828
13388.7, 13386.2, ! -2.48828
13393.1, 13390.8, ! -2.28027
13399.5, 13397.2, ! -2.28027
13403.4, 13401, ! -2.4873
13409.5, 13406.8, ! -2.69531
13413.4, 13411.1, ! -2.28027
13418.4, 13416.1, ! -2.28027
13438.9, 13436.6, ! -2.28027
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 180 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN X-30APB2 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN X-30APB2
APIN
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
iiiiiiiilliiiiiiii( Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
from well X-30APB1 dated 24 Sep 2007 above the KOP of 13450 feet MD
per poug Dortch with BP Exploration (Alaska), Inc.
*** INFORMATION TABLE: CIFO
MNEM
----- CHAN DIMT
------------------ CNAM
----------- ODEP
------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
~
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F j
Number of frames per record is: 36
One depth per frame (value= O)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
3 RAD MWD 68 1 OHMM
4 RAS MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 RPS MWD 68 1 OHMM
Total Data Records: 41
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Tape File Start Depth = 12858.000000
Tape File End Depth = 13592.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 54 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN X-30APB2.xtf
LCC 150
CN BP Exploration (Alaska)
WN X-30APB2
APIN
~
~
~
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
iilliiiiiiiiiiiiiii Remark File Version 1.000
This file contains the raw-unedited field MWD data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 82
Tape File Start Depth = 12858.000000
Tape File End Depth = 13591.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 95 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
~
**** TAPE TRAILER ****
MWD
07/09/27
1563395
O1
**** REEL TRAILER ****
MWD
08/10/21
BHI
O1
Tape Subfile: 4 2 records...
~
Minimum record length: 132 bytes
Maximum record length: 132 bytes
u
~
Tape Subfile 1 is type: LIS
.
Tape Subfile 2 is type: LIS
DEPTH GR ROP
RPD RPS
12858.0000 28.4085 -999.2500
-999.2500 -999.2500
12858.5000 31.1751 -999.2500
-999.2500 -999.2500
12900.0000 34.1301 39.7972
7.2888 8.8563
13000.0000 27.6866 70.1401
3.5636 3.5562
13100.0000 30.7527 61.1425
6.8070 7.2990
13200.0000 29.4995 59.6332
6.6670 5.8910
13300.0000 27.5997 96.4397
9.6830 10.1690
13400.0000 83.7278 50.2696
11.9320 11.5780
13500.0000 24.3570 53.5203
7.9620 8.0113
13592.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 12858.000000
Tape File End Depth = 13592.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
~
RAD
-999.2500
-999.2500
4.0256
4.0051
7.0771
8.4447
9.7596
12.9253
8.7977
-999.2500
RAS
-999.2500
-999.2500
5.7345
3.7536
6.8310
8.0547
9.9810
13.7649
8.5049
-999.2500
.
Tape Subfile 3 is type: LIS
DEPTH GR ROP
RPD RPS
12858.0000 30.1000 -999.250C
-999.2500 -999.2500
12858.2500 29.7000 -999.250C
-999.2500 -999.2500
12900.0000 32.8000 114.OOOC
6.6590 7.5900
13000.0000 27.6000 58.200C
3.5130 3.5500
13100.0000 29.7000 71.5000
6.9590 7.3620
13200.0000 25.4000 27.0000
6.7650 6.2350
13300.0000 29.4000 86.4000
9.9290 10.5760
13400.0000 94.3000 38.8000
12.0410 11.4600
13500.0000 25.4000 54.9000
8.3560 8.5700
13591.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 12858.000000
Tape File End Depth = 13591.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
~
RAD
-999.2500
-999.2500
3.4920
3.9230
7.3080
8.3700
9.8210
13.1340
9.0940
-999.2500
RAS
-999.2500
-999.2500
4.9430
3.6990
7.1230
7.8610
10.1140
14.1030
8.8440
-999.2500
.
~
Tape Subfile 4 is type: LIS