Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout199-106Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning.
They are available in the original file, may be scanned during the rescan activity or are viewable
by direct inspection of the file.
/ 2 ~' /~ ~ Well History File Identifier
RESCAN
D/olor items:
J Grayscale items:
[] Poor Quality Originals:
Other:
DIGITAL DATA
~'~'""~iskettes No./
[] Other, No/Type
OVERSIZED (Scannable)
[] Maps:
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
TOTAL PAGES:(~ NOTES:
ORGANIZED BY: BEVERLY BREN(~HERYL MARIA LOWELL
[] Other
Project Proofing
PROOFED BY: BEVERLY BREN.~:~SHER% MARIA LOWELL
[] Staff Proof
By: Date:
SCANNED BY; BEVERLY ~N VINCENT SHERYL MARIA
LOWELL
Isl
General Notes or Comments about this file:
PAGES:
Quality Checked (done)
Rev 1 NOTSca nned.v4xI
Permit to Drill 1991060
MD 4370 TVD
DATA SUBMITTAL COMPLIANCE REPORT
9~6~2002
Well Name/No. PRUDHOE BAY UN WBH WB-07
Operator BP EXPLORATION (ALASKA) INC
4366 Completion Dat 6/10/2000 ~ Completion Statu W'I'RSP
Current Status WTRSP
APl No. 50-029-22949-00-00
UIC N
REQUIRED INFORMATION
Mud Log N._9o Sample No
Directional Survey ~--.N~o~/-'~'-,
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type ~~ Fmt
Interval
Log Log Run
Name Scale Media No Start
C C
D D
USIT 5 FINAL
DGR/EWR4-MD 2/5 FINAL
RST/GRAVEL PACK 5 FINAL
9627 1
9569 1,2
SRVY RPT
DGR/EWR4-TVD 2/5 FINAL
3754
64
2O0
108
3900
0
68
(data taken from Logs Portion of Master Well Data Maint)
Stop
4342
4359
3940
4370
4350
437O
4052
OH I Dataset
CH Received Number Comments
Case f---~13/2000 09627 3754-4342
Open ~000 09569 64-4359
CH 2/4/2000 BL(C) 200-3940
OH 6/21/2000 108-4370
CH 6/13/2000 3900-4350
CH 6/13/2000 9627 SCHLUM RST
OH 6/21/2000 9569 SPERRY MPT/GR
OH 1/26/2000 SPERRY 0-4370.
OH 6/21/2000 68-4052
Well Cores/Samples Information:
Name
Interval
Start Stop Sent
Received
Dataset
Number Comments
ADDITIONAL INFORMATION
Well Cored? Y/(!~
Chips Received? ~
.._~___...-~.
Analysis Y / N
Daily History Received?
Formation Tops
Comments:
Permit to Drill
1991060
DATA SUBMITTAL COMPLIANCE REPORT
9/612002
Well Name/No. PRUDHOE BAY UN WBH WB-07
Operator BP EXPLORATION (ALASKA) INC
APl No. 50-029-22949-00-00
MD 4370
TVD 4366
Compliance Reviewed By:
Completion Dat 6/10/2000
Completion Statu
WTRSP
Current Status WTRSP
Date:
UIC N
STATE OF ALASKA ....
ALASK, IL AND GAS CONSERVATION COMr, _,SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Water Supply for Injection
2. Name of operator 7. Permit Number
BP Exploration (Alaska) Inc. 199-106 300-017
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22949-00
4. Location of well at surface~' ~ ~'~?:i'~;~"i?~ i~:;~i~)!':i"~i i LOCAt'tONSI~i 9. Unit or Lease Name
69' NSL, 3429' WEL, SEC. 25, T12N, R14E, UM ?.i": ~ I ¥[~"~ i~ West Beach
At top of productive interval ~ ~,/z~ ;c-~d) i
32'29' SNL, 3422' WEL, SEC. 36, T12N, R14E, UM ~At SNL,t°tal depth3422, WEL, SEC. 36, T12N, R14E, UM i! ......................... ................. '~?~'~:~V) :~ ~: ;~~t!i~ ~'~-~'--'~i' 10. Well Number~t~~ WE-07
~ ....................... '11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Undefined
KBE = 39.7' AMSL ADL 028301
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey1 20. Depth where SSSV sot1 21. Thickness of Permafrost
4370 4366 FTI. 4370 4366 FTI. [] Yes [] NoI N/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, ESS, RST, USIT
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SiZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 120' 30" 250 sx Arcticset I (Approx.)
9-5/8" 40# L-80 28' 4094' 12-1/4" 1069 sx Articset Lite 3, 276 sx Class 'G'
6-5/8" x 4" 9.5# L-80 3952' 4360' 8-3/4" Uncemented, Gravel Pack Assembly
24. Perforations open to, Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
7" Gun Diameter, 18 spf 4-1/2", 12.6#, L-80 2727'
MD TVD MD TVD 4-1/2", 12.6#, 8rd, P-110 2777'- 3170' 2777' (Gravel PackAs$embly)
2910' - 3156' 2910' - 3156' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
3900' Set Bridge Plug
3820' P&A Lower Wellbore w/6 Bbls Class 'G'
Graved Pack Assy, 2896'- 3166' 17,780# of 20/40 Carbolite Behind Pipe
2100' Freeze Protect with 150 Bbls of Diesel
27. PRODUCTION TEST
Date First prOduction Method of Operation (Flowing, gas lift, etc.)
December 25, 2000 Water Supply for Injection
Date of Test HOurs TeSted PRoDuCTIoN FOR OiL-EEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing PreSsure CALcuLATED OIL-DEL GAS-MoF WATER-BEE OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent ~C~r~.~..~,i~as or water. Submit core chips.
J/ N B 5 Z001
Alaska 0il & Gas Cons. Commission
Anchorage
Form 10-407 Rev. 07-01-80
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
SV 5 (T-8) 3270' 3266'
SV 4 (T-8) 3552' 3548'
SV 3 (T-5) 3935' 3931'
SV 2 4124' 4120'
,
31. List of Attachments: Summary of Daily Drilling Reports
(Original Survey and Formation Integrity Test submitted with the 10-404 on 02/22/00)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble~"~~ Title TechnicalAssistant Date I~)J'~o)o~r-Ot
WB-07 199-106 300-017
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No./Approval No.
iNSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
RECEIVED
Form 10-407 Rev. 07-01-80
JAN g 5 2001
Alaska Oil & Gas Cons. Commission
Facility
Date/Time
03 Jan 00
04 Jan O0
05 Jan 00
Progress Report
West Beach
Well WBEACH-07 Page 1
Rig Nabors 7ES Date 20 June 00
16:00-06:00
16:00-19:30
19:30
19:30-06:00
06:00-16:00
06:00-16:00
16:00
16:00-18:30
16:00-17:30
17:30
17:30-18:30
18:30
18:30-19:30
18:30-19:30
19:30
19:30-03:00
19:30-03:00
03:00
03:00-06:00
03:00-06:00
03:00-06:00
06:00-09:30
06:00-09:30
09:30
09:30-11:00
09:30-11:00
Duration
14hr
3-1/2 hr
10-1/2 hr
10hr
10hr
2-1/2 hr
1-1/2 hr
lhr
1 hr
lhr
7-1/2 hr
7-1/2 hr
3hr
3hr
3hr
3-1/2 hr
3-1/2 hr
1-1/2 hr
1-1/2 hr
Activity
Move rig
Rigged down Drillfloor / Derrick
Prepare to move rig.
Equipment work completed
Rig moved 75.00 %
Staged camp and pits on PM-1 pad. Moved sub off
well to West Beach 7. (Had delay in moving shop
ahead of sub due to Peak breakdown.) Finished R/U
diverter and setting pit liner and shims, prior to move
rig over conductor, at report time
Move rig (cont...)
Rig moved 100.00 %
Level pad behind cellar. Lay mats and herculite.
Spot wellhead equip behind rig. Move sub base over
cellar. Back pit module down access road. Lay
herculite and spot pits.
At well location - Cellar
Rig accepted at 1600 hrs, 1/4/2000.
Fluid system
Fill pits with Water
Spot cuttings tank, camp and shop. Finish berm
under rig. Take on water.
Completed operations
Held safety meeting
Held Pre-Spud safety meeting. Reviewed pre-spud
checklist, well plan, safety and environmental
expectations.
Completed operations
Test well control equipment
Tested Divertor
Finished R/U and function tested divertor. Test
witnesses by L. Grimaldi AOGCC.
Function test completed satisfactorily
Planned maintenance
Serviced Top drive
Changed saver sub XO and guide to 4-1/2" IF.
Installed 5-1/2" liners in pump #1. Load and tally 5"
drill pipe. N/U riser and towline.
Equipment work completed
Run Drillpipe, 5in O.D.
Racked back Drillpipe
Finished PU 5" DP, HWDP and Jars.
Racked back Drillpipe
PFU and stand back 5" drill pipe to drill surface
hole.
Run Drillpipe, 5in O.D. (cont...)
Racked back Drillpipe (cont...)
PFU and stand back 5" drill pipe to drill surface
hole.
Required components racked in derrick
Perform integrity test
Tested Divertor
Function test divertor and pressure test surface
equipment. Held D3 divertor drill. Held pre-spud
meeting with crew.
'7
Progress Report
Facility West Beach
Well WBEACH-07 Page 2
Rig Nabors 7ES Date 20 June 00
Date/Time
06 Jan 00
07 Jan O0
08 Jan 00
11:00
11:00-12:30
11:00-12:30
12:30
12:30-18:30
12:30-18:30
18:30
18:30-06:00
18:30-06:00
18:30-06:00
18:30-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:15
06:15
06:15-08:30
08:30
08:30-09:00
09:00
09:00-06:00
09:00-06:00
06:00-00:00
06:00-06:15
Duration
1-1/2 hr
1-1/2 hr
6hr
6 hr
11-1/2 hr
11-1/2 hr
11-1/2 hr
11-1/2 hr
24 hr
24 hr
24 hr
1/4 hr
2-1/4 hr
1/2 hr
21hr
21 hr
18hr
1/4 hr
Activity
Function test completed satisfactorily
BHA run no. 1
Made up BHA no. 1
PU bit, motor and encounter resistance 7' below
ground level. PU jars, HWDP to drill out ice in
conductor.
Observed 20.00 klb resistance
BHA run no. 1
Washed to 167.5 ft
Drilled out ice obstruction in conductor. Drilled
to bottom of conductor plus enough rathole to PU
remaining BHA components (MWD, flex collars, HWDP,
jars, etc)..
No further resistance
BHA run no. 1
Drilled to 623.5 ft
Drilled from 2,170' to 2,238' MD.
Drilled to 623.5 ft
Drill from 625' to 2,170' MD per plan. Will make
wiper trip to BHA first stand down after 2,200'
MD.
Drilled to 623.5 ft
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). Some
packing off observed at 578' (pea gravel).
BHA run no. 1 (cont...)
Drilled to 2168.5 ft (cont...)
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). Some
packing off observed at 578' (pea gravel).
BHA run no. 1 (cont...)
Drilled to 2236.5 ft (cont...)
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). Some
packing off observed at 578' (pea gravel).
Began precautionary measures
Pulled out of hole to 910.5 fl
CBU and make wiper trip back up through permafrostt,
and gravels. Hole in good condition.
At top of check trip interval
R.I.H. to 2236.5 ft
RIH to 2,238' MD. No problems, no fill on bottom.
On bottom
Drilled to 4073.5 ft
Drilled from 4,075' to 4,096' MD. TD selected by
Geologist 160' below SV3 marker.
Drilled to 4073.5 ft
Drill from 2,238' to 4,075' MD. Geologist picked
TD at 4,096' MD using SV3 marker.
BHA run no. 1 (cont...)
Drilled to 4094.5 ft (cont...)
Drill from 2,238' to 4,075' MD. Geologist picked
TD at 4,096' MD using SV3 marker.
Progress Report
Facility West Beach
Well WBEACH-07 Page 3
Rig Nabors 7ES Date 20 June 00
Date/Time
09 Jan O0
10 Jan O0
06:15
06:15-07:15
07:15
07:15-13:00
13:00
13:00-15:30
15:30
15:30-17:30
17:30
17:30-00:00
00:00
00:00-06:00
06:00-21:00
06:00-09:00
09:00
09:00-21:00
21:00
21:00-06:00
21:00-01:00
01:00
01:00-03:00
03:00
03:00-06:00
03:00-06:00
Duration
lhr
5-3/4 hr
2-1/2 hr
2hr
6-1/2 hr
6hr
15hr
3hr
12hr
9hr
4 hr
2hr
3hr
3hr
Activity
Reached planned end of mn - Geological
Circulated at 4094.5 ft
CBU and check for flow. Blow down top drive.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 1658.5 ft
Make wiper trip to top of HWDP. Intermittent drag
(25-40k) in first 5-10 stands off bottom with
swabbing. Appearance of balled up stabilizer.
At top of check trip interval
R.I.H. to 4094.5 ft
RIH back to interval TD. Wash and ream through
tight spots at 1,800', 2,330' and 2,428' MD (0-5k
WOB).
On bottom
Circulated at 4094.5 ft
Pump 35 bbl pill (15 gal Condet, 5 sx nutplug, 1
gal SAPP) followed by 30 bbl hi vis sweep (2 sx
Barazan, 5 sx Barofiber). No appreciable cuttings
increase. Circ and cond for casing.
Obtained clean returns - 150.00 % hole volume
Pulled BHA
POOH with BHA #1. Drop ESS tool at 1,231' and
survey from 1,231' to 1,137' MD for JORPS. LID BHA and
clear rig floor.
BHA Laid out
Run Casing, 9-5/8in O.D.
Run Casing, 9-5/8in O.D. (cont...)
Ran Casing to 3218.5 ft (9-5/8in OD)
Run casing to 3,220' MD without incident. Met
resistance at 3,220' MD. GR logs showed near top of
100' thick shale just above SV5 sands.
Began precautionary measures
Washed to 4094.5 ft
Wash and work casing to TD of interval. Appearance
of pushing obstruction ahead. Good pick up weights
and no packing off observed.
On bottom
Cement · Casing cement
Circulated at 4094.5 ft
Circulate and condition hole for 1 st stage cement
job.
Obtained req. fluid properties - 200.00 %, hole vol.
Mixed and pumped slurry - 162.000 bbl
Mix and pump 10 bbl water, 50 bbl spacer, drop
plug, 105 bbls lead, 57 bbls tail, drop plug and
displace with rig pumps. 1st stage cement in
place at 0245 hrs. Bled off pressure and checked
float equipment - OK.
Tail cement pumped
Circulated at 2049.5 ft
Circulate through ES Cementer and condition mud for
2nd stage cement job.
Circulated at 2049.5 ft
Pressure up and open ES cementer. Circ and cond
Progress Report
Facility West Beach
Well WBEACH-07 Page 4
Rig Nabors 7ES Date 20 June 00
Date/Time
11 Jan 00
06:00-12:00
06:00-06:30
06:30
06:30-08:30
08:30
08:30-09:30
09:30
09:30-12:00
12:00
12:00-06:00
12:00-14:00
14:00
14:00-15:00
15:00
15:00-21:30
21:30
21:30-00:00
00:00
00:00-06:00
00:00-06:00
06:00-10:30
06:00-10:30
Duration
6 hr
1/2 hr
2hr
lhr
2-1/2 hr
18hr
2hr
1 hr
6-1/2 hr
2-1/2 hr
6 hr
6 hr
4-1/2 hr
4-1/2 hr
Activity
Cement: Casing cement (cont...)
Circulated at 2049.5 ft (cont...)
Pressure up and open ES cementer. Circ and cond
for 2nd stage cement job.
Obtained clean returns - 300.00 % hole volume
Mixed and pumped slurry - 740.000 bbl
Pump 2nd stage cement. 10 bbl water, 75 bbl
viscosified spacer, 740 bbl 10.755 Arctic Set 3 slurry.
Drop closing plug, displace with rig @ 11 BPM. Bump
plug to 2,000 psi. Check for flow back - OK. CIP
0830 hrs.
Cement pumped
Volumes pumped equivalent to 412% excess in annulus
above ES Cementer.
Cleared Bell nipple
Flush and drain stack, clean possum belly and
shakers.
Equipment work completed
Rigged down Divertor
ND divertor, split bell nipple and lift divertor
stack.
Equipment work completed
Wellhead work
Installed Emergency hang off assembly
Set emergency slips with 75k over.
Equipment work completed, seal energised
Cut Casing at 22.5 ft
RU mud cap evacuation tool and "void" casing stub
to 30'. Make rough cut. Pull 9-5/8" casing stub,
RD mud evac tools.
Completed operations
Rigged down Divertor
Finish ND divertor assembly. Utilize heavy
equipment crane to remove divertor components from
cellar area. Clear cellar area of tools and
equipment.
Equipment work completed
Welded casing stub
Make final casing cut, preheat and weld transition
nipple onto 9-5/8" casing stub.
Completed operations
Tested Extension sleeve
Wait on transition nipple weld to cool. Once cool,
will pressure test same and begin NU BOPE.
Tested Extension sleeve
Wait on transition nipple to cool. RU and test
weld to 1,750 psi. NU 11" x 5k Tabasco style tubing
head and test seal area to 1,000 psi for 10 mins.
Good test.
Wellhead work (cont...)
Tested Extension sleeve (cont...)
Wait on transition nipple to cool. RU and test
.... 1..! *~ I ~'7~'t'~ --~-* %TIT I ," ~'1. ,-,-,_,_ ..... ,..,_ bi
Facility
West Beach
Progress Report
Well WBEACH-07 Page 5
Rig Nabors 7ES Date 20 June 00
Date/Time
12 Jan O0
10:30
10:30-21:00
10:30-17:30
17:30
17:30-21:00
21:00
21:00-06:00
21:00-21:30
21:30
21:30-00:00
00:00
00:00-01:00
01:00
01:00-03:00
03:00
03:00-03:30
03:30
03:30-04:00
04:00
04:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00-11:00
06:00-08:00
08:00
08:00-08:30
08:30
08:30-10:30
10:30
10:30-11:00
11:00
11:00-11:30
Duration
10-1/2 hr
7hr
3-1/2 hr
9hr
1/2 hr
2-1/2 hr
lhr
2hr
1/2 hr
1/2 hr
lhr
lhr
lhr
5hr
2hr
2hr
1/2 hr
1/2 hr
Activity head and test seal area to 1,000 psi for 10 mins.
Pressure test completed successfully - 1000.000 psi
Nipple up All functions
Rigged up BOP stack
NU BOPE.
Equipment work completed
Tested BOP stack
Set test plug, RU and pressure test BOPE to 250 psi
low and 3,000 psi high. Test annular to 250 psi
low and 2,500 psi hish. Pull test plug. Set wear
bushing, RILDS.
Pressure test completed successfully - 3000.000 psi
BHA run no. 2
Held safety meeting
Hold PJSM and Technical Limit meeting.
Completed operations
Made up BHA no. 2
MU BHA #2 to 876' MD.
BHA no. 2 made up
R.I.H. to 2049.5 ft
RIH to ES Cementer.
Observed 20.00 klb resistance
Tag up on ES Cementer at 2,051' MD.
Drilled installed equipment - DV collar
Drill ES Cementer at 2,051' MD.
Completed operations
R.I.H. to 3938.5 ft
RIH to TOC at 3,940' MD.
Observed 25.00 klb resistance
Tag up on TOC.
Circulated at 3938.5 ft
Circulate bottoms up.
Obtained bottoms up (100% annulus volume)
Tested Casing - Via string
RU and pressure test 9-5/8" casing to 3,000 psi for
30 minutes. RD.
Pressure test completed successfully - 3000.000 psi
Drilled cement to 4013.5 ft
Drilling cement and shoe track.
Drilled cement to 4013.5 ft
Drilled cement, FE and 5' new hole to 4,101' MD.
BHA run no. 2 (cont...)
Drilled cement to 4099.5 ft (cont...)
Drilled cement, FE and 5' new hole to 4,101' MD.
Completed operations
Circulated at 4099.5 ft
Circ bottoms up.
Obtained bottoms up (100% annulus volume)
Circulated at 4099.5 ft
Displace wellbore to 3% KCL BARADRILn.
Hole displaced with Water based mud - 100.00 % displaced
Drilled to 4114.5 ft
Drill 15' additional rathole for FIT.
Stopped: To perform FIT
Perform integrity test
O
Facility
West Beach
Progress Report
Well WBEACH-07 Page 6
Rig Nabors 7ES Date 20 June 00
Date/Time
13 Jan 00
14 Jan 00
11:00-11:30
11:30
11:30-19:30
11:30-14:00
14:00
14:00-16:00
16:00
16:00-19:30
19:30
19:30-06:00
19:30-20:30
20:30
20:30-22:30
22:30
22:30-23:30
23:30
23:30-01:00
01:00
01:00-02:00
02:00
02:00-06:00
02:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-07:00
Duration
1/2 hr
8hr
2-1/2 hr
2 hr
3-1/2 hr
10-1/2 hr
1 hr
2hr
lhr
1-1/2 hr
lhr
4hr
4hr
24 hr
24 hr
24 hr
lhr
Activity
Performed formation integrity test
Perform FIT to 9.6 ppg (0.5 ppg over MW).
Obtained required level of integrity - 9.6 ppg EMW
BHA run no. 2
Drilled to 4368.5 ft
Drill to 4,370' MD.
Reached planned end of run - Section / well T.D.
Circulated at 4368.5 ft
Circ and cond.
Obtained clean returns - 200.00 % hole volume
Pulled BHA
POOH with BHA #2. Clear rig floor.
BHA Laid out
BHA run no. 3
Made up BHA no. 3
PU BHA #3. Space out and MU tandem scrapers and
open bit.
B HA no. 3 made up
R.I.H. to 4368.5 ft
RIH with bit, scrapers to TD. No fill on bottom.
On bottom
Pulled out of hole to 2068.5 ft
Make short trip (bottom scraper just under ES
cementer).
At top of check trip interval
R.I.H. to 4368.5 ft
RIH to 4,370' MD. No fill.
On bottom
Circulated at 4368.5 ft
Spot 9.3 ppg Xanvis pill (2.5x open hole volume) in
open hole section. Pull 3 stands back up into
casing.
50.000 bbl LCM pill spotted downhole, LCM content 0.0 lb/bbl
Serviced Fluid system
Clean mud pits and all surface circulating
equipment in preparation of taking on -10 NTU
completion brine.
Using HB&R oiler to keep stored brine warm
Serviced Fluid system
Clean mud pits and all surface circulating
equipment in preparation for completion brine.
Tiger tanks, DE unit, transfer pump spotted and LLJ
bermed with herculite. 1,200 bbls brine on location.
BHA run no. 3 (cont...)
Serviced Fluid system (cont...)
Clean mud pits and all surface circulating
equipment in preparation for completion brine.
Tiger tanks, DE unit, transfer pump spotted and
bermed with herculite. 1,200 bbls brine on location.
BHA run no. 3 (cont...)
Serviced Fluid system
1'1111311 g,l~'~l, lJllJ[ III
Facility
West Beach
Progress Report
Well WBEACH-07 Page 7
Rig Nabors 7ES Date 20 June 00
Date/Time
15 Jan 00
07:00
07:00-08:00
08:00
08:00-09:30
09:30
09:30-11:00
11:00
11:00-12:30
12:30
12:30-17:00
17:00
17:00-17:30
17:30
17:30-19:30
19:30
19:30-20:30
20:30
20:30-06:00
20:30-06:00
06:00-17:30
06:00-10:00
10:00
10:00-12:00
Duration
lhr
1-1/2 hr
1-1/2 hr
1-1/2 hr
4-1/2 hr
1/2 hr
2hr
lhr
9-1/2 hr
9-1/2 hr
11-1/2 hr
4hr
2hr
Activity lines.
Equipment work completed
Held safety meeting
Hold PJSM for displacing well from mud to brine.
Spot trucks, HAZMAT trailer and rig up circulating
lines.
Completed operations
Circulated at 4072.5 ft
Displace BARADRLn mud system from wellbore. Pump
50 bbl hi vis spacer followed by 350 bbl of 8.7 ppg
filtered brine.
Hole displaced with Brine - 200.00 % displaced
Cleared Flowline
Clean surface equipment (flowline, auger, etc)
contaminated by mud returns. Take on additional brine
in rig pits.
Equipment work completed
Circulated at 4072.5 ft
PJSM with Baroid prior to pumping caustic pills.
RU and pump caustic wash down drillstring.
String displaced with Brine - 100.00 % displaced
Circulated at 4072.5 ft
RU Vac truck to annulus and circulate out caustic
pill slowly to ensure fluids do not enter rig
system. Rotate and reciprocate drillstring while
circulating caustic up annulus.
Obtained clean returns - 150.00 % hole volume
Held safety meeting
PJSM with Dowell prior to pumping acid pickle.
Completed operations
Circulated at 4072.5 ft
Pump DP acid pickle - 5 bbl brine, 10 bbl Xanvis
(2.5 ppb), 10 bbl of 9.0 ppg brine tubing wash, 12
bbl of 15% HCL and displace to within 0.5 bbl of bit
with Dowell.
String displaced with Acid - 100.00 % displaced
Reverse circulated at 4072.5 ft
Close annulur and reverse out acid pickle with rig
pumps. Take clean brine to pits, diverting acid
pickle back to cuttings box.
String displaced with Brine - 150.00 % displaced
Serviced Fluid system
Filter brine in rig pits. Targeting minimum 400
bbls at 20 NTU's before circulating.
Serviced Fluid system
Filter brine in rig pits. Achieved targeted
minimum of 2 hole volumes at surface with <20
NTU's.
BHA run no. 3 (cont...)
Serviced Fluid system (cont...)
Filter brine in rig pits. Achieved targeted L/-
minimum of 2 hole volumes at surface with <20
NTU's.
Equipment work completed
Circulated at 4072.5 ft
~.~,,ll~.,llllJ,[.~, llOlt,, ¥~k./lUlll~.3 ~Jl ~.,l~.IJ, ll IIILUI~.U OililY,
Progress Report
Facility West Beach
Well WBEACH-07 Page 8
Rig Nabors 7ES Date 20 June 00
Date/Time
12:00
12:00-13:30
13:30
13:30-17:30
17:30
17:30-06:00
17:30-18:00
18:00
18:00-04:30
16 Jan 00 04:30
04:30-06:00
04:30-06:00
06:00-00:00
06:00-07:00
07:00
07:00-08:00
08:00
08:00-09:00
09:00
09:00-10:00
10:00
10:00-10:30
10:30
10:30-13:30
Duration
1-1/2 hr
4hr
12-1/2 hr
1/2 hr
10-1/2 hr
1-1/2 hr
1-1/2 hr
18hr
lhr
lhr
1 hr
lhr
1/2 hr
3 hr
Activity into wellbore. Returns cleaned up to 11 NTU's.
Hole displaced with Brine - 200.00 % displaced
R.I.H. to 4368.5 ft
Trip in hole slowly. Tag bottom at 4,370' MD. No
fill!!
On bottom
Pulled BHA
POOH slowly. Drop 2.375" rabbit. LD scrapers,
jars, bit sub and bit. Clear rig floor.
BHA Laid out
4.590 in. Screen assembly workstring run
Held safety meeting
Hold PJSM for running GP completion.
Completed operations
Ran Drillpipe in stands to 4368.5 ft
Run Gravel Pack screens using false
rotary. RU and run 2-7/8" innerstring, tag, space
out, PU GP packer. RIH with assembly on 5" DP at
3 min per stand. Tag bottom, PU 2 DP pups and
space out with DP connection just above annular.
On bottom
Rigged up High pressure lines
Finish RU high pressure Dowell lines. Change over
to long bails.
Rigged up High pressure lines
RU Dowell high pressure lines. Swap out to long
bails on top drive.
4.590 in. Screen assembly workstring run (cont...)
Rigged up High pressure lines (cont...)
RU Dowell high pressure lines. Swap out to long
bails on top drive.
Equipment work completed
Functioned Gravel pack tool
Pump 5 bbl brine to clear ball seat, drop ball and
pressure up to set gravel pack packer. Release
n--
from same.
Equipment work completed ~> c-...
Reverse circulated at 3957.5 ft ~-.
Reverse out packer setting ball and recover same. MU
String displaced with Brine - 250.00 % displaced
Circulated at 3957.5 ft ~ --':
Pump 60 bbl brine to displace high visc Xanvis pill
from open hole. Once inside casing, reverse out
same. Returns to cuttings tank.
Obtained clean returns - 150.00 % hole volume
Held safety meeting
PJSM for gravel pack.
Completed operations
Gravel pack - 427.000 bbl pumped at 1100.0 psi, screen out at 2900.0 psi
Establish circ rates. Pump 5,000 gal acid stim,
427 total bbl brine/sand slurry. Screen out
early. Est. 7150 # sand pumped before screen out.
Held morning tour crew over for 1 hour to ensure
smooth turnover during critical operation.
Progress Report
Facility West Beach
Well WBEACH-07 Page 9
Rig Nabors 7ES Date 20 June 00
Date/Time
13:30
13:30-16:00
16:00
16:00-17:00
17:00
17:00-18:00
18:00
18:00-18:30
18:30
18:30-19:30
19:30
19:30-00:00
17 Jan O0 00:00
00:00-06:00
00:00-01:00
01:00
01:00-03:30
03:30
03:30-06:00
03:30-06:00
06:00-12:00
06:00-08:00
08:00
08:00-08:30
Duration
2-1/2 hr
1 hr
lhr
1/2 hr
lhr
4-1/2 hr
6hr
lhr
2-1/2 hr
2-1/2 hr
2-1/2 hr
6hr
2hr
1/2 hr
Activity
Aborted gravel pack
Reverse circulated at 3957.5 ft
Reposition gravel pack tool after screen out and
reverse out sand from drillsting. Took returns over
shakers and sand to cuttings box. Est 2,000 # sand
reversed out.
Obtained clean returns - 300.00 % hole volume
Circulated at 3957.5 ft
RU and attempt to circulate through gravel pack
with rig pumps. 1 BPM @ 1,500 psi. Shutdown.
Began precautionary measures
Removed High pressure lines
Blow down and RD Dowell high pressure lines.
Equipment work completed
Pulled out of hole to 3585.5 ft
POOH 4 stands to clear inner workstring from gravel
pack assembly. LD pup joints.
Began precautionary measures
Rigged up Drillstring handling equipment
Change over to short bales.
Equipment work completed
Pulled out of hole to - 1.5 ft
POOH. LD 2-7/8" inner string.
At BHA
2-7/8" inner gravel pack string laid out.
BHA run no. 4
Made up BHA no. 4
MU Baker SC-1 Packer Retrieving Tool, XO, 2-Bumper
Subs, 23 HWDP.
BHA no. 4 made up
R.I.H. to 3957.5 ft
RIH and wash slowly to top of gravel pack packer.
Snap in, latch and unseat packer.
Began precautionary measures
Pulled out of hole to 3598.5 ft
POOH slowly with fish.
Pulled out of hole to 3598.5 ft
POOH slowly, working GP assembly up and down
through sand. Targeted max overpull of 40k.
Pulled screens above 9-5/8" shoe by 0500 hrs.
Pump out first 3 stands (very slow pull) to keep
top drive from freezing. POOH slowly, monitoring
fluid levels.
BHA run no. 4 (cont...)
Pulled out of hole to 409.5 ft (cont...)
POOH slowly, working GP assembly up and down
through sand. Targeted max overpull of 40k.
Pulled screens above 9-5/8" shoe by 0500 hrs.
Pump out first 3 stands (very slow pull) to keep
top drive from freezing. POOH slowly, monitoring
fluid levels.
Fish at surface
Held safety meeting
PJSM on LD packer and gravel pack screens.
o
Progress Report
Facility West Beach
Well WBEACH-07 Page 10
Rig Nabors 7ES Date 20 June 00
Date/Time
18 Jan 00
08:30
08:30-12:00
12:00
12:00-13:00
12:00-13:00
13:00
13:00-19:00
13:00-19:00
19:00
19:00-04:00
19:00-21:00
21:00
21:00-23:30
23:30
23:30-00:30
00:30
00:30-03:30
03:30
03:30-04:00
04:00
04:00-06:00
04:00-06:00
04:00-06:00
06:00-06:00
06:00-08:30
08:30
08:30-09:00
09:00
09:00-13:30
13:30
13:30-14:30
14:30
14:30-16:00
Duration
3-1/2 hr
lhr
1 hr
6hr
6hr
9hr
2hr
2-1/2 hr
1 hr
3hr
1/2 hr
2hr
2hr
2hr
24 hr
2-1/2 hr
1/2hr
4-1/2hr
lhr
1-1/2 hr
Activity
Completed operations
Laid down fish
LD gravel pack packer and gravel pack screens. No
apparent damage. 100% recovery, including all
centralizers. LD fishing BHA.
Complete fish recovered
Derrick management
Rigged down Drillstring handling equipment
RD fish and BHA handling equipment and clear floor.
Equipment work completed
Test well control equipment
Tested BOP stack
Pull wear bushing, install test plug. RU and test
BOPE to 250 psi low and 3,000 psi high. Pull test
plug, install wear bushing.
Function test completed satisfactorily
BHA run no. 5
R.I.H. to 4092.5 ft
MU clean out BHA and RIH to 9-5/8" shoe.
At 9-5/8in casing shoe
Circulated at 4092.5 ft
Take on additional clean brine. Circulate 2 hole
volumes, establishing pump rates, pressures and
percent returns.
Hole displaced with Brine - 200.00 % displaced
R.I.H. to 4358.5 ft
Trip into open hole slowly looking for fill. Tag
up at 4,360' MD (10' fill).
Observed 5.00 klb resistance
Pulled out of hole to 722.5 ft
POOH slowly to clean out BHA.
At BHA U.!
Pulled BHA
LD BHA #5. Clear rig floor.
BHA Laid out
4.590 in. Screen assembly workstring run
Ran Drillpipe in stands to 198.5 ft
PU and run gravel pack screen assembly.
Ran Drillpipe in stands to 198.5 ft
RIH w/gravel pack screens on drill pipe.
4.590 in. Screen assembly workstring run (cont...)
Ran Drillpipe in stands to 608.5 ft (cont...)
RIH w/gravel pack screens on drill pipe.
Began precautionary measures
Pulled out of hole to 411.5 ft
L/D knock out isolation valve.
Stopped ' At sub-assembly
Ran Drillpipe in stands to 4362.5 ft
At Setting depth' 4362.5 ft
Rigged up High pressure lines
R/U Dowell to pump on well. Changed bails on top
drive to make room for circ equipment.
Equipment work completed
Set packer at 3949.5 ft with 2500.0 psi
h ..... .,-I L~ll ----.J 1~4- J2'--11 ~ L~ll ---4- 1'1
UIU~UU U~ill ~llU IGL lglll LU U~ll ~t. I
Facility
West Beach
Progress Report
Well WBEACH-07 Page 11
Rig Nabors 7ES Date 20 June 00
Date/Time
19 Jan O0
16:00
16:00-19:00
19:00
19:00-19:30
19:30
19:30-21:00
21:00
21:00-22:00
22:00
22:00-23:00
23:00
23:00-00:00
00:00
00:00-01:30
01:30
01:30-02:30
02:30
02:30-03:30
03:30
03:30-05:30
05:30
05:30-06:00
06:00-10:00
06:00-06:30
06:30
06:30-08:30
08:30
08:30-10:00
10:00
10:00-11:00
10:00-11:00
11:00
11:00-23:30
11:00-12:00
12:00
12:00-12:30
12:30
12:30-17:30
Duration
3 hr
1/2 hr
1-1/2 hr
lhr
lhr
1 hr
1-1/2 hr
lhr
lhr
2hr
1/2 hr
4hr
1/2 hr
2hr
1-1/2 hr
lhr
lhr
12-1/2 hr
lhr
1/2 hr
5hr
Activity to 2500 psi to set gravel packer. PFU and S/D 15K
Packer set at 3955.5 ft
Reverse circulated at 3949.5 ft
Rev circ ball. Ball became lost in chicksan when
changed out, found ball.
Stopped · To hold safety meeting
Held safety meeting
Completed operations
Gravel pack - 189.000 bbl pumped at 1450.0 psi, screen out at 2400.0 psi
R/U Dowell and pressure test lines to 5000 psi.
Pumped gravel pack slurry, 189 bbls total. Pumped
5700 # sand and screened out.
Aborted gravel pack
Reverse circulated at 3949.5 ft
Reverse circ sand from drill pipe.
Obtained clean returns - 800.00 % hole volume
Injectivity test - 14.000 bbl injected at 750.0 psi
Establish injection rates.
Completed injectivity test
Monitor wellbore pressures
Observed well static
Gravel pack - 2880.000 bbl pumped at 1250.0 psi, screen out at 2550.0
Screened out with 2880 lbs sand pumped, 500 #
behind pipe.
Aborted gravel pack
Reverse circulated at 3949.5 ft
Reverse out sand, 8 bpm 600 psi.
Obtained clean returns - 200.00 % hole volume
Injectivity test - 14.000 bbl injected at 750.0 psi
1 bpm = 150 psi 2 bpm = 350 psi 3 bpm = 750 psi
Completed injectivity test
Reverse circulated at 3949.5 ft
Reverse circulate 400 bbls clean brine.
Hole displaced with Brine - 200.00 % displaced
Removed High pressure lines
R/D Dowell lines. Prep to POH for logs.
4.590 in. Screen assembly workstring run (cont...)
Removed High pressure lines (cont...)
R/D Dowell lines. Prep to POH for logs.
Equipment work completed
Pulled Drillpipe in stands to 3948.5 ft
ct)
Stopped' To change handling equipment
Laid down 353.0 ft of Tubing
~ O
12 joints laid out
Planned maintenance
Serviced Top drive
Equipment work completed
Electric wireline work
Rigged up Logging/braided cable equipment
Equipment work completed
Held safety meeting
Completed operations
Conducted electric cable operations
PFLI RST gravel pack logging tool and RIH to 4357'
WLM. Made 3 passes to 3950'.
Facility
West Beach
Progress Report
Well WBEACH-07 Page 12
Rig Nabors 7ES Date 20 June 00
Date/Time
20 Jan 00
17:30
17:30-22:30
22:30
22:30-23:30
23:30
23:30-06:00
23:30-00:00
00:00
00:00-02:30
02:30
02:30-03:30
03:30
03:30-06:00
06:00-08:00
06:00-08:00
08:00
08:00-08:30
08:00-08:30
08:30
08:30-12:30
08:30-09:30
09:30
09:30-12:30
12:30
12:30-13:00
12:30-13:00
13:00
13:00-19:00
13:00-15:00
15:00
15:00-18:00
18:00
18:00-19:00
19:00
Duration
5hr
1 hr
6-1/2 hr
1/2 hr
2-1/2 hr
1 hr
2-1/2 hr
2 hr
2 hr
1/2 hr
1/2 hr
4hr
lhr
3 hr
1/2 hr
1/2 hr
6hr
2hr
3hr
lhr
Activity
Completed logging run with Production logging tools from 4355.5 ft
3948.5 ft
Conducted electric cable operations
Logging run #2. USIT log from 3940' to surface.
Completed logging run with Cement evaluation tool from 3938.5 ft
ft
Rigged down Logging/braided cable equipment
Equipment work completed
5in. Drillpipe workstring run
Rigged up sub-surface equipment - Bridge plug
PFU HES 9-5/8" model III retrievable bridge plug.
Equipment work completed
Ran Drillpipe in stands to 3898.5 ft
At Setting depth: 3898.5 ft
Tested Bridge plug - Via string
Set RBP at 3900'. Tested 9-5/8" casing and RBP to
2000 psi, OK
Pressure test completed successfully - 2000.000 psi
Laid down Drillpipe of 2700.0 ft
POH LDDP.
5in. Drillpipe workstring run (cont...)
Laid down 3900.0 ft of Drillpipe (cont...)
POH LDDP.
126 joints laid out
Wellhead work
Removed Wear bushing
Equipment work completed
Run Tubing, 4-1/2in O.D.
Rigged up Tubing handling equipment
PJSM. Finish R/U to run tubing.
Equipment work completed
Ran Tubing to 2189.5 ft (4-1/2in OD)
Ran 53 jts 4-1/2", IBT-M, L-80 tbg. PFU tubing
hanger, install dummy penetrators. Run allignment
pin, land tubing. RILDS.
Hanger landed
Wellhead work
Installed Hanger plug [~U
Installed TWC.
Equipment work completed ~--.
Nipple down BOP stack
Rigged down BOP stack
N/D mousehole, flow line, turnbuckles. Left 4
bolts in BOP.
Stopped: To service drilling equipment
Serviced Blind / Shear ram
Open blind ram doors. Inspect hydraulic rams for
wear. Function with accumulator. Clean and close
doors. (One side functions tight, had problems
previously).
Equipment work completed
Removed BOP stack
Finished remove BOP stack.
Equipment work completed
-1.5
Facility
West Beach
Progress Report
Well WBEACH-07 Page 13
Rig Nabors 7ES Date 20 June 00
Date/Time
21 Jan 00
19:00-23:00
19:00-22:30
22:30
22:30-23:00
23:00
23:00-06:00
23:00-00:00
00:00
Duration
4hr
3-1/2 hr
1/2 hr
7 hr
lhr
Activity
Wellhead work
Installed Xmas tree
Install adapter flange. NFU tree and pressure test
to 3000 psi.
Equipment work completed
Removed Hanger plug
Pulled TWC.
Equipment work completed
Fluid system
Freeze protect well - 155.000 bbl of Diesel
Pumped 155 bbls freeze protect with HBR. Set BPV.
Completed operations
Released rig for move to D-12 RWO @ 2400 hrs
1/20/2000.
F-]CEIVED
R~~t & Gas Cons Commission
Anchorage
Legal Vvell Name: VVB-07
Common Vvell Name: VVB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1/2000 End: 6/10/2000
Contractor Name: NABORS Rig Release: 6/10/2000 Group: DRK1
Rig Name: NABORS 9ES Rig Number: 9
::Date::: Hoars;: ~ask; ;:Phase: : Description of Operations
6/1/2000 06:00 - 00:00 18.00 MOVE PRE Move camp, pit complex and workshop to WB-07. Move sub from
M15RWO to WB-07. Raise derrick. Lay herculite. Spot rig, workshop,
pits and camp. PJU Top drive.
6/2/2000 00:00 - 04:00 4.00 MOVE PRE Spot rig, camp, pit complex and workshop. Berm and herculite
complete rig and pit complex. Hook Up lines to pits. Accept rig @ 0400
hrs on June 2nd 2000
04:00 - 09:00 5.00 WHSUR DECOMP Nipple up Secondary annulus valve. Hook up lines to wellhead. Take on
seawater to pits and test all lines to 3500 psi.
09:00 - 11:00 2.00 WHSUR DECOMP Circulate out freeze protect from well. Install TWC and test from below
to 500 psi.
11:00 - 12:00 1.00 WHSUR DECOMP N/D tree and adaptor and set aside in cellar area. Inspect hanger
threads.
12:00 - 15:00 3.00 BOPSUR DECOMP N/U BOP, adaptor and choke hose.
15:00 - 20:30 5.50 BOPSUR DECOMP Open doors and flush BOP cavities of all debris. Close dooers and
Install bell nipple and mousehole.
20:30 - 21:00 0.50 BOPSUR DECOMP Conduct Pre-spud meeting with drillcrews to discuss HSE issues and
operations of WB-07
21:00 - 00:00 3.00 BOPSUF DECOMP Test BOPE to 300/3000 psi. JohnSpalding of AOGCC witness.
6/3/2000 ,00:00 - 01:30 1.50 BOPSUF DECOMP Test BOPE to 3000 psi. AOGCC witness. RID Test equipment.
01:30- 05:00 3.50 PULL iDECOMP M/U Landing joint and POOH-Lay down hanger and 53joints of 4.1/2"
Tuning, L-80, 12.6 lb/ft.
05:00 - 06:00 1.00 BOPSUF DECOMP Install Wear ring.
06:00 - 07:30 1.50 CLEAN DECOMP M/U 8.75" Bit and tandem scraper assembly. RIH picking up 5" drillpipe,
drifting same to 500 ft.
07:30 - 08:00 0.50 CLEAN DECOMP Hold Pre-spud meeting with rigcrew to discuss operations and HSE
issues.
08:00 - 11:30 3.50 CLEAN DECOMP RIh picking up 5" drillpipe and tag cement @ 3,822 ft. ~
11:30 - 12:30 1.00 CLEAN DECOMP i Pump 40 bbls Hi-vis sweep around hole rotating BHA @ 40 RPM when
sweep in annulus.
12:30 - 14:00 1.50 CLEAN DECOMP Make short trip placing bit @ 2100ft.
14:00 - 14:30 0.50 CLEAN DECOMP Pump 40 bbls Hi vis @ 11 BPM/300 psi rotating BHA when sweep in
annulus.
14:30 - 23:00 8.50 CLEAN DECOMP Clean up pits and rig in preparation for clean filtrered brine. Take on
filtered brine @ 16 NTU's. Flush all lines.
23:00 - 00:00 1.00 CLEAN DECOMP Pump 35 bbls, 3& Caustic Flush followed by 40 bbls filtered 4% Brine
followed by 75 bbls Hot Caustic SL wash and displace w/filtered Brine
rotating pipe @ 40 RPM when sweeps in annulus.
6/4/2000 00:00 - 04:30 4.50 CLEAN DECOMP Circulate out Caustic treatment and continue to circulate attempting to
reduce NTU's. Unable to get below 50 NTU after 3 hole volumes. Make
decison to do acid pickle on Drillpipe.
04:30 - 07:30 3.00i CLEAN DECOMP Line upto Dowell and Peak Trucks. Test lines to 2000 psi. Hold PJSM.
Pump 10 bbls Xanvis/10 bbls Caustic/3 bbls KCL/12 bbls 15% HCL
Acid and displace to end of pipe @ 1 bpm holding back pressure on
choke. Reverse circulate out fluids @ 2 BPM and dispose of directly in
cuttings tank.
07:30 - 11:00 3.50 CLEAN DECOMP Reverse circulate Filtered Brine @ 9 BPM/1140 psi. Obtain NTU's
coming out at 20 after 2 hole volumes.
11:00 - 14:30 3.50 CLEAN DECOMP POOH and lay down scrapers and bit.
14:30 - 15:30 1.00 CLEAN DECOMP Test Casing to 300/3000 psi. 4.2 bbls pumped/returned
19:00 - 20:00 1.00 PERF COMP R/U handling equipment and condcut Safety Meetiing to discuss gun
handling.
20:00 - 00:00 4.00 PERF COMP M/U 246 ft of 7" guns @ 18 SPF and RIH- tag sump packer and space
out.
Printed: 1/24/2001 10:30:18AM
:Legal Well Name: WB-07
Common Well Name: WB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1/2000 End: 6/10~2000
Contractor Name: NABORS Rig Release: 6/10/2000 Group: DRK1
Rig Name: NABORS 9ES Rig Number: 9
Description of Operations
6/5/2000 00:00 - 02:30 2.50 PERF COMP With Packer set and Bypass open displace drillstring to 53 bbls Diesel.
for 200 psi underbalnce. Close Bypass and put 500 psi on annulus.
02:30 - 07:00 4.50 PERF PERF COMP Pressure upto 2500 psi/1 bbl/Wait 40 mins- No Fire. Repeat process
@ 3000 psi- no go. Attempt to pressure up third time but bypass
leaking. Unable to reset packer going down.
07:00 - 10:00 3.00 PERF PERF COMP Reverse Circulate out Diesel from drillpipe. Continue to circulate -
NTU's down to 36 out. Some rust residue from bottoms up- cleaned up.
10:00 - 12:00 2.00 PERF PERF COMP POOH and put Top of firing head @ 150 ft. Fluid level @ 215 ft.
12:00 - 15:00 3.00 PERF PERF COMP Allow condiitions to stabilise prior to pulling firing head to rigfloor. Hold
Safety Meeting with all rig personnel to dicuss plan forward.
15:00 - 17:00 2.00 PERF PERF COMP With All non essential personnel off rig pull firing head to rigfloor and
inspect same- establish HDF firing pins had sheared but had not
released firing pin. Pull 80 ft guns and ensure dry inside. Replace
O-rings and set slips.
17:00 - 22:30 5.50 PERF PERF COMP Wit onSchlumberger while Firing head inspected and replacement
constrcucted- change firing pin and lubricants on firing pin retainer
balls.
22:30 - 00:00 1.50 PERF PERF COMP Make up Firing Head and RIH.
& GaS Co~s. C°~r~s~°u
Printed: 1/24/2001 10:30:18AM
Legal Well Name: WB-07
Common Well Name: WB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1/2000 End: 6/10~2000
Contractor Name: NABORS Rig Release: 6/10/2000 Group: ELEC
Rig Name: NABORS 9ES Rig Number: 9
::DAte Fromm:To HOUrs Task :Rhase Description of Operations
6/4/2000 !15:30 - 16:00 0.50 DHEQP DECOMP R/U and run 8.6" gauge ring and junk basket to 3,200'. Recover some
small pieces of cement scale in junk basket.
16:00 - 19:00 3.00 DHEQP DECOMP R/U and run 9.5/8" sump packer @ 3,166 ft correlating to LWD log of
Jan-2000. ( Collar @ 3,158'). PJD Schlumberger
RECEIVED
Alaska Oil & Gas ConS. commission
A~,cho[a9e
Printed: 1/24/2001 10:30:18AM
BP AMOcO Page4 of 6
: Operations sUmmary Report
Legal Well Name: WB-07
Common Well Name: WB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1/2000 End: 6/10/2000
Contractor Name: NABORS Rig Release: 6/10/2000 Group: RIG
Rig Name: NABORS 9ES Rig Number: 9
D~ ' ':::;:: :;..'..:: :::" :',..:: :sub: :':::.~::: :i:: :: : . . .
· , te From ~;~o Hours'.::~ask. ~:'. Phase: :: :' Descnpbon of Operations
6/6/2000 00:00 - 03:30 3.50 PERF PERF COMP Finish MU TCP assembly #2. RIH to tag at 3163'.
03:30 - 05:00 1.50 PERF PERF COMP RU to displace to diesel. Held PJSM. Space out and set packer.
Displace dp with 53 diesel. Closed bypass valve and pressure annulus
to 375 psi. Pressure dp to 3000 psi and held 1 min. Bleed to 0 psi. Wait
22 min. before guns fired. ISlDPP = 300 psi.
05:00 - 10:00 5.00 PERF COMP Bleed DP to 0 psi. Well dead. Reverse circ. w/100 bbl/hr loss. Regular
circulate 2 hole volumes w/75 bbl/hr loss. Shut down and observe well.
Well dead.
10:00 - 14:00 4.00 PERF COMP POOH and LD TCP guns. 3 shots missfired and 1 Iow order shot. Hole
losing 43 bbl/hr, static.
14:00 - 16:30 2.50 DST COMP MU RTTS assembly w/Multi service valve and RIH to 2800'. Mu
circulating lines and test to 3000 psi.
16:30 - 17:30 1.00 DST ODR COMP Wait on orders concerning packer placement for drawdown pressure.
17:30 - 18:00 0.50 DST ODR COMP POOH to 1600'
18:00 - 20:00 2.00 DST COMP RU and test lines to 3000 psi. Set RTTS and pressure annulus to 1000
psi to open MSV. Immediate weak blow. Shut in with ISlDPP = 24 psi.
SlDPP = 25 psi after 20 min. Bleed back via choke and observe well.
Well dead. Open bypass and reverse circ 2 DP volumes. Unseat RTTS
and observe well. Hole taking fluid.
20:00 - 21:30 1.50 DST COMP POOH and LD RTTS.
21:30 - 00:00 2.50 CLEAN COMP PU 8.68" string mill and wash shoe. RIH w/5 K holdup bobbles at
2914', 2972', 3002', 3044', 3099'. Dry rotate 3099' to 3109' and 3119' to
3122'. RIH to 3156'. POOH to 2885' and prepare to circulate.
6/7/2000 00:00 - 02:30 2.50 CLEAN COMP Circulate 2 hole volumes at 2885'. Loses = '100 bbl/hr. Attempt to clean
returns. No solids on shakers. Brine in = 11 NTU. Returns = ~45 - 50
NTU. Stop circ. due to exessive losses.
02:30 - 04:30 2.00 CLEAN COMP POOH and LD mill.
04:30 - 08:30 4.00 CLEAN COMP M/U Mule shoe and Model 18-L snap latch locater. RIH and latch w/5 K
slack off. PU and unlatch w/10 K. Set down and latch w/15 K. Pick up
,- and unlatch wi 15K overpull. POOH and LD 27 singles of 5" DP. Run
.o_
.~ remaining stands of 5" from derick to 2885'.
- 08:30 - 12:30 4.00 CLEAN COMP Circ. at 4 bpm w/20 psi. Losing 100 -120 bph. NTU stabilized at ~80
.~ ~ units after 3 hrs. ( NTU of brine being pumped was ,,-10 units.) Shut
J o down and observe well. Well dead.
~ ~ 12:30 - 14:00 1.50 CLEAN COMP POOH and LD Snap latch dummy.
~ o~ ~ 14:00 - 17:00 3.00 EVAL COMP RU slickline w/4.5" Guage ring and 2.25" drive down bailer. RIH w/
, ~ ~ Bobble at packer (3166' WLM). Bobbles 3550 to 3640'. Drive bail at
~ ,~ 3640'. POOH tight at 3635'. Pulled loose w/oil jar at 900# OP. POOH
~ wi no further drag. Recover -.2 Itr. fine grained non -cemented black
~ sand. RD slick line.
~ 17:00 - 00:00 7.00 RUNCOI~ COMP RU to run Gravel Pack screen assembly.
~ PJSM. PU screen assembly and wash pipe. PU packer and XO. Start
in hole with screen on 5" DP.
6/8/2000 00:00 - 06:30 6.50 RUNCOr~ COMP RIH w/Gravel pack screens on 5 "DP. Tag and confirm latch at 3166'.
SO - 100 K. PU = 102 K. Latch OP: 15 K. PJSM. RU 3" frac lines and
test to 6000 psi. Drop packer setting ball & set packer w/1700 psi.
Work service tool and set to reverse ciirculating possition.
06:30 - 08:30 2.00 RUNCOItl COMP PJSM. Pickle treat DP w/500 gal. 15 % HCL. Reverse out treatment.
08:30 - 11:00 2.50 RUNCOItl COMP Reverse circulate to condition. Brine in = ,,-17 NTU. Brine out stabilized
Printed: 1/24/2001 10:30:18AM
Legal Well Name: WB-07
Common Well Name: WB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1 ~2000 End: 6/10~2000
Contractor Name: NABOR$ Rig Release: 6/10/2000 Group: RIG
Rig Name: NABOR$ 9E8 Rig Number: 9
::::~k': :: ~h~::: : Description of operations
6~8~2000 08:30 - 11:00 2.50 RUNCOI~ COMP at ~ 70 NTU after 2 rounds. Continue circ. at 6 bpm. & 625 psi.
11:00 - 15:00 4.00 STIM COMP PJSM. Data Frac. Spot fluid and inject at 10 bpm. w/180 psi.
Increase to 20 bpm @ 450 psi. No fracture propogated. Cycle tools
and reverse out. Repeat Data frac @ 30 bpm w/1120 psi ITP and frac
propogated FTP = 1260 psi. Cycle tools and reverse out. Stage fluid
and Step test at 5 bpm intervals to 30 bpm &1120 psi. Cycle tools and
reverse out.
15:00 - 20:00 5.00 STIM COMP Analyse data and redesign frac. Build up material volumes necessary
!due to extended DataFrac pumping schedule.
20:00 - 00:00 4.00 STIM COMP PJSM Frac-Pac w/Gelled pad at 30 #/1000 gal and staged proppant at
1 to 8 PPA.Screened off at 360 bbl and 17780# pumped behind screen.
TP at screen out = 1707 psi. Attempt to re establish injection. Analyse
results and reverse to clear ports. Open tool and attempt to inject w/
2600 psi and no movement. Pull and reverse out @ 5 bpm w/
54 NTU out. Unseat seals and monitor well. no flow or loss.
61912000 00:00 - 03:30 3.50 STIM COMP POOH and lay down 5" DP and screen running tools. Clear floor.
03:30 - 05:30 2.00 SANDO~ COMP PJSM RU slickline wi blind sinker bar. RIH and rupture flapper at 2802'.
RIH to 3585 and encountwered drag. Observe static well. POOH and
RD slickline.
05:30 - 07:30 2.00 RUNCOk COMP Pull WB. Change out bails. RU 4.5" tubing tools.
07:30 - 12:30 5.00 RUNCOk COMP PJSM. RU ESP tools on floor and spot cable spooler on location. Hang
54" sheave and string up cable. MU flat-round splice.
12:30 - 19:00 6.50 RUNCO~ COMP PU ESP Motor assembly w/Baker RTD sensor sub. Centrilift HMI 725
series tandem motor, seal section,
19:00 - 19:30 0.50 RUNCO~ MOTR COMP Found galled shaft and coupling on bottom of lower pump. XO for back
up unit.
19:30 - 23:00 3.50 RUNCO~ COMP MU upper motor, XO, and Pup. Connect Baker Pressure-temperature
)robe and splice I-conductor to ESR cable.
20:30 - 00:00 3.50 RUNCOI~I COMP RIH w/4.5" Tubing. Placing cable protector clamps on every collar.
6/10/2000 00:00 - 12:30 12.50 RUNCOI~4 COMP Run ESP completion on 4.5", 12.6#, L-80, MBTC Tubing. MU tubing
hanger and ESP and Info. cable connections. Land tubing w/ESP at
2726.74'. LD landing jt., set TWC and test to 1000 psi.
12:30 - 14:30 2.00 RUNCOI~ COMP LD mouse hole anfflow nipple. ND Choke and kill lines..ND BOP and
set on stump.
14:30 - 15:00 0.50 RUNCOI~ COMP Test ESP and I-lines for continuity and Meg.
15:00 - 16:30 1.50 RUNCOI~ COMP NU Tobasco tree and test seals. SBMS sleeve seal leaking to tubing.
16:30 - 19:30 3.00 RUNCOI~REE COMP ND tree and tubing head flange. Pull SBMS sleeve and re dress. MU
i flange and tree. Test to 5000 psi OK. Electric tese ESP and I-line.
19:30 - 21:00 1.50 RUNCOI~ COMP PULL TWC w/lubricator .PJSM RU HB&R to freeze protect. Test
lines.
21:00 - 22:30 1.50 RUNCOI~ COMP Freeze protect to 2100' w/150 bbl diesel. Lost returns immediately.
Equalized well at 175 PSI.on annulus and tubing. Clear lines and
manifold and RD Hot oil pumper.
22:30 - 00:00 1.50 RUNCOI~ COMP Run BP¥ w/Lubricator. Check that BPV holds SITP and RD lubr. Clear
cellar and Release rig at 24:00 6/10/00
RECEIVED
JAN 2, 5 ?001
Alaska Oil & Gas Cons. Commission
Anchorage
Printed: 1/24/2001 10:30:18AM
Legal Well Name: WB-07
Common Well Name: WB-07 Spud Date: 6/1/2000
Event Name: COMPLETION Start: 6/1/2000 End: 6/10/2000
Contractor Name: NABORS Rig Release: 6/10/2000 Group:
Rig Name: NABORS 9ES Rig Number: 9
i D~t~::.: :.ErO~T~ HOb:rS TasE :: ~ha:se ~ DeSCription of Operations
6/11/2000 i oo:oo - 0.00RUNCOr COMP
RECEIVED
JAN
Alaska Oil & Gas Cons. Commission
Anchorage
Printed: 1/24/2001 10:30:18 AM
Page 1 of 2
Well Service Report
Well IlJob Scope II Job Number
WB-07 [IDRILL-PREP WORK 110524001324.2
Date IIDaily Work IIUnit Number
05/26/2000 I[DRILL-PREP WORK: CT CEMENT PLUG [ICTU #5
Day IIOperation Complete IlSuccessful
0 ]1 True II False I[ DS-OLSEN I[ FULLER
Field
IIAFC# lice# IlDaily Cost Ilnccum Cost IlSigned
Il 2D0078 IIN^wBm4DHll 63747 II 70348 II ~
IlInit Tbg Press Ilv'inal Tbg Press IlInit Inner Ann IIFinal Inner Ann IlInit Outer Ann IlFinal Outer Ann
3so !1 o II o II o II o II o
Daily LAY IN 80' 15.8 PPG CLASS G CEMENT ON TOP OF BRIDGE PLUG AT 3900'
Summary TOC @ 3820'. LAY DIESEL IN KILL STRING ON WAY OUT OF HOLE FROM
2200'. [Plug-Abandon Perfs]
[Time [[Log Entry
I12:00 I[MIRUDOCT#5,2"X.156"X 14981' COIL, 218KRF, 41BBLSCAP.(OLSEN)
I 13:00 Ilmu 2.0" CRC, 2.5" BALL DROP NOZZLE
14:00 R/U HARDLINE TO REVERS SKID, PT LUB AND SURFACE EQUIPMENT TO
4000 PSI
14:30 RIH, START PUMPING SEA WATER. PRES'TEST BRIDGE PLUG TO 500 PSI
(HELD ROCK SOLID)
15:30 DRY TAG BRIDGE PLUG AT 3887' CTM, REPEAT. PUH AND START
CIRCULATING IN 80 DEG. SEA WATER
[ 16:30 [IMIx WATER IS UNACCEPTABLE, STANDBY FOR CLEAN WATER
I 18:15 ][CEMENTERS BATCHING UP, CONDUCT PJSM.
18:40 PT CEMENTERS, COME ON LINE WITH CEMENT DOWN THE COIL.
PUMPED 5.7 BBLS 15.7 PPG
19:00 COIL PARKED AT TOP OF BRIDGE PLUG WHEN CEMENT GOT TO NOZZLE
THREE BARRELS AROUND NOZZLE, PUH AT 56 FT/MIN PUMPING 2 BPM
19:05 IINoZZLE AT TOC WHEN IT EXITED. (TOC AT 3820' MD)
19:25 SWAP TO DIESEL DOWN COIL, SWAP TO 50/50 METH WATER. (45 BBLS
DIESEL AWAY). LAY IN DIESEL AT 80% FROM 2200'.
20:20[IooH,FLUSH HARDLINE
20:40 [[RDMO
JAN 2 5 ZOO1
Alaska Oil & Gas Cons. Commission
Anchorage
http://alaska.bpweb.bp.com/sst_drill.../atdbworklog.asp ?ID=WB 0752600151051 &Field=PB
1/24/2001
DRI LLI I~1 13 c:; E R ~./I r- E c;
WELL LOG TRANSMiTrAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
June 22, 2000
RE: MWD Formation Evaluation Logs · D.S. WB-07, AK-MM-90222
The technical data list.ed below is being submitted herewith. Please address any problems or concems
to the attention
Yam Galvin, SPerry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
,,D,~S. WB-07:
2"x 5" MD Gamma Ray Logs:
50-029-22949-00
2"x 5" TVD Gamma Ray Logs:
50,029-22949-00
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded 'Sepia
R,ECEi D
JUN 2 1 2000
Alaska 0il & Gas Cons. uommission
Anchorage
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535
a Halliburton company
DRILLING C;ERI/Ir-E=~
WELL LOG TRANSMITTAL
To: State of Alaska June 15, 2000
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501 {.~ ~ ~'
MWD Formation Evaluation Logs - D.S. WB-07,
RE: AK-MM-90222
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22949-00.
RECEiV ED
JUN 21 2000
Alaska 0il & Gas Cons. Commission
Anchorage
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535
a Halliburton company
6/7/00
Scbhwberger
Schlumberger Technology Corporation, by and through is GeoqueSt Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A'I'TN: Sherrie
NO. 211
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Well Job # Log Description Date BL Sepia CD
WB-07 ~ (~(t,/.."~ 20046 RST 000119
1
WB-07 20046 GRAVEL PACK/RST 000119 I I
,.
SIGNED¥---.~ ,.../ x',,--'~--~,~ ~ ~ DATE: JUN
Alaska 0il & (;as Cons. Commission
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Tha~~.q6
STATE OF ALASKA
ALAS~-,.~, OIL AND GAS CONSERVATION CON,,vllSSION
APPLICATION FOR SUNDRY APPROVAL
CONFIDENTIAL?~
1. Type of Request:
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Re-Enter eps Shutdown
2. Name of Operator
ARCO Alaska Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
69' NSL, 3429' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
29' SNL, 3422' WEL, SEC. 36, T12N, R14E, UM
At effective depth
32' SNL, 3422' WEL, SEC. 36, T12N, R14E, UM
At total depth
32' SNL, 3422' WEL, SEC. 36, T12N, R14E, UM
5. Type of well:
[] Development
r"l Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 39.7' AMSL
7. Unit or Property Name
West Beach
8. Well Number
WB-07
9. Permit Number
199-106, 300-017
10. APl Number
50- 029-22949-00
11. Field and Pool
Prudhoe Bay Field / Undefined
12.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
4370 feet
4366 feet
4370 feet
4366 feet
Length
Size
120' 20"
4066' 9-5/8"
Plugs (measured) Set Retrievable Bridge Plug at 3900'
Junk (measured)
Cemented MD
250 sx Arcticset I (Approx.) 120'
1069 sx Arcticset Lite 3, 276 sx 'G' 4094'
ORIGINAL
RECEIVED
TVD
120'
4090'
Perforation depth: measured None - Open Hole from 4094' - 4370'
true vertical None - Open Hole TVD from 4090' - 4366'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 2192'
,',"!AY 08 2000
Alaska 0il & Gas Con~. Commission
Anchorage
Packers and SSSV (type and measured depth) Gravel Pack Assembly: 9-5/8" Baker 'SCl' packer at 3952' with 4" bull plug at 4360'
13. Attachments
[] Description Summary of Proposal
14. Estimated date for commencing operation
May 25, 2000
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Numbec Bill Isaacson, 564-5521
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[] Oil [] Gas [] Suspended
Service Water Supply for Injection
Prepared By Narne/Numbec Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Dan Stone ~-~--"~'~.~.-'-~'*~.:~ Title Senior DrilJingEngineer Date
Signed
ConditiOns of Appr0vaii NotifY commission s° rePresentative maY witneSs ........................ ~,._." _, ~,,'_"' ' ~/~,~,
_
Plug integrity v'" BOP Test v Location clearance I
Mechanical Integrity Test.~,~,NAL ,,GNF-D' BySUbsequent form required 10-~C)~,.~¢.~¥ O4 (~?~O~./~ -~-
Approved by order of the Commission e~"~e
Form 10-403 Rev. 06/15/88 Rvb6~ N. ,',~.~o*.-n~,3n ~ Co r Dat
............. _/.-'"~ Submit In Triplicate
are. d
rvlces
rillin.q
Mr. Blair Wondzell
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
(907) 279-1433
(907) 276-7542 (fax)
May 5, 2000
Re: Re-Entry of West Beach Well WB-07 (Permit #199-106)
Dear Mr. Wondzell,
Plans to re-enter and complete operations on the Water Source Well WB-07 (Permit #199-106) have been
developed.
Water source well WB-07 was drilled as planned to the proposed target, however due to complications
encountered during operations to gravel pack the production interval, the well could not be completed. Two
separate attempts were made to gravel pack the desired SV2 Sand interval and both were unsuccessful after
'screening-out' early, with less than half the anticipated gravel volume behind the screens. To allow a detailed
evaluation of the plan forward, operations on WB-07 were suspended on January 20th, 2000.
An industry 'Peer Assist' was completed in February in attempt to identify the root cause of the problems
experienced during the WB-07 gravel pack operations, and to develop a path forward to successfully complete
the well. Based upon recommendations from the peer assist process, plans to re-enter and complete an
alternative sand interval have been developed. The SV2 interval targeted during the original gravel pack
operations will be abandoned, and a shallow Tertiary reservoir section completed with a cased-hole gravel-
pack using the 'Frac-Pack' technology. The well will be completed with a 4-1/2" ESP completion as originally
planned.
Attached is a general procedure of the planned operations with schematics of the current wellbore condition
and proposed well completion. Pre-rig operations are planned to begin around May 25th, with rig operations
beginning around June 5th. If you have any questions or require additional information on this matter, please
contact me at 564-5521.
Sincerely,
William S. Isaacson
Drilling Engineer
Share Services Drilling
RECEIVED
I, ,qY 08 2000
Alaska Oii& Gas Cot~a.
WB-07 Cased Hole AIIFRAC
General Procedure
Pre-Rig Work:
1. RIH with CTU and lay-in -75' cement plug on top of RBP at 3900' MD.
2. Pressure test casing to 3000 psi for 30 min.
3. Set a BPV in the tubing hanger. Secure well.
4. Prep location for MIRU of Nabors 9ES.
Rig
1.
2.
3.
4.
5.
6.
Operations:
MIRU Nabors 9ES.
Pull BPV. Circulate out freeze protection and displace well to clean seawater. Set TWC.
Nipple down tree. Nipple up and test BOPE. Pull TWC.
Pull and lay down 4-1/2" tubing from ~2200'.
PU 8-3/4" bit and tandem 9-5/8" casing scrapers on 5" DP. RIH to top of cement plug.
Clean rig circulating system in preparation to accept filtered completion brine. Displace well to filtered
4% KCI completion brine. POOH.
7. RU E-line. Make gauge ring /junk basket run through planned perf interval. RIH and set sump
packer assembly 10' below the planned bottom perforation.
8. PU 7" casing guns on DP and RIH. Tag sump packer assembly and tie-in guns to shoot 246' of
interval from 2910' to 3156' MD. Set packer and perforate well -200 psi underbalanced. POOH LD
all guns.
9. PU flow-back assembly and RIH with DP evacuated to atmospheric pressure. Set packer -100'
above the top perforation. Close annular and shut-in DP at surface. Pressure up on annulus to open
service valve in drill string, allowing formation to surge into the atmospheric pressure chamber in the
DP. Once the DP pressure has stabilized, slowly bleed back pressure (air) allowing formation to flow
I DP volume or until the well is dead. Release packer and reverse circulate formation fluid from DP
until clean 4% KCI brine returns to surface. POOH and LD flow-back assembly.
10. RU slickline. RIH and tag fill in 9-5/8" casing. POOH.
11. PU dummy snap-latch Iocator with 4-1/2" stinger. RIH on 5" DP and latch into lower sump packer to
verify polished bore and latch is clear of debris. Snap out and POOH.
12. PU Dowell AIIFRAC assembly. RIH and latch into lower sump packer. Set Dowell GP packer at top of
AIIFRAC assembly and release running tools. Perform acid pickle on workstring and filter completion
brine to desired tolerances.
13. Perform DataFRAC to evaluate upcoming StimPAC design. Perform StimPAC treatment pumping
approximately 88,000 lbs of 20/40 carbolite propant. POOH laying down DP and gravel pack tools.
14. RU slickline. RIH and tag fill in 9-5/8" casing. POOH.
15. Run 4-1/2", 12.6# L-80 IBT-Mod Electric Submersible Pump completion.
16. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way
check and freeze protect the well to -2000'.
17. Install BPV. Secure the well and rig down / move off 9ES.
WB-07 AFE #2D0078
WB-07 Current Wellbore Condition
Tree: Horizontal FMC 4-1/16" 5M L-80
Wellhead: FMC ARCO Tabasco 11" x 5M psi
20", 91.5#, H-40 ~
Diesel Freeze Protect displaced to -2192' MD
9-5/8", 40 #, L-80, BTC-Mod
Open-Hole Interval across SV2 Sand
4", 9.5 #, L-80, SL-HT ~
8.6 ppg 4% KCl
Kill Weight Brine
~OoO
IOo o o°°
~Ooo oo
oo ,Oo{
(OOo i°oo
)t~ ~ o.
OooOo oOo
Total Depth
CONFIDENTIAL
Cellar Box Elev = 11.2'
Rig 7ES RKB = 39.7'
4-1/2" 5M psi FMC Eccentrick Tubing Hanger landed in wellhead with 4-1/2" 12.6# L-80,
IBTC-Mod Kill String run to 2192' MD
r' 0 8:2000
..... .,01.qmL,,10il
,~aska 0ii & Gas C0~.~. c
Retrievable Bridge Plug set at 3900' MD.
C=mvRI P~ck A.~.~Rmhly with P~ckRr .~.t ~t: J 3,95~' J
g-5/8" 40#/ft 'SC-I' Gravel Pack Packer
Gravel Pack Extension Sleeve
Lower Extension with crossover to 4" 9.5# SL-HT
- 4" 9.5# SL-HT Blank Pipe as Required
- 4" 9.5# SL-HT 8 gauge Gravel Pack Screen as Required (with centralizers)
- 4" Gravel Pack Bull Plug
4,370' MD J
4,365' TVD
Date
5/3/00
Rev By
WSI
Comments
Current We!!bore Condition
West Beach
WELL: WB-07
APl NO: 50-029-22949
Shared Services Drilling
Tree: Horizontal FMC 4-1/16" 5M L-80
Wellhead: FMC ARCO Tabasco 11' x 5M psi
WB-07 Proposed Completion
CONFIDENTIAL
Cellar Box Elev = 11.2'
Rig 7ES RKB = 39.7'
20", 91.5#, H-40 I 120'
#1 power cable with tech
wire in armor wrap
G. 4-1/2" 5M psi FMC Eccentrick Tubing Hanger with 'BIW' penetrators for ESP cable and
downhole gauge conductor wire. 4-1/2" L-80 BTC-Mod tubing pup below hanger.
F. 4-1/2" 12.6# L-80, IBTC-Mod Tbg to surface with Nova Cable Protector Clamps run on
the coupling of each joint to surface.
Cable splice from motor lead
to #1 power cable, adjacent to
10' pup above pump.
725 Series 'CEE-5KV'
Motor Lead Extension Cable
1/4" Tech Wire running from
'RTD' Sensor Sub to 'Sentry'
Gauge above ESP
Perforation Interval: 2910' - 3156' MD.
E. 1 joint of 4-1/2" 'L-80 BTC-Mod tubing with annulus sensing Baker 'Sentry' gauge clamped to
tubing OD.
D. 10' x 4-1/2" L-80 BTC-Mod pup joint.
C. Centrilift 'HC 12000' Tandem Pump (70 stages, 2 @ 35) with crossover to 4-1/2" BTC-Mod.
B. Centdlift Model 'HST3' Seal Section.
A. Centrilift 'HMI' 725 Series 750 hp Motor (4160v / 108 amp) with Baker 'RTD' sensor sub
mounted on bottom. Bottom of motor set +/-50' above liner top.
AIIFRAC A.~.~P. mhl.v with Top PackP. r set atIi +/.2,742,II
- 9-5/8" 40#/ft 'QUANTUM' Gravel Pack Packer
- 'QUANTUM' Cimulating Housing with Lower Extension
- Large Bore Flapper Valve
- 90K Safety Sheer Sub with crossover
- 4-1/2" 13.5# P-110 Blank Pipe as Required
- 4-1/2" 13.5# P-110 Blank AIIFRAC Pipe as Required (with centralizers)
- 4-1/2" 13.5# P-110 12 gauge AIIFRAC Screen as Required (with centralizers)
4-1/2" Seal Assembly Snap Latch Locator (latched into lower packer)
- 9-5/8" DS2 Model 18L Sump Packer (set -10' below bottom perforation)
Top of Cement P&A Plug at 3825' MD.
Retrievable Bridge Plug set at 3900' MD.
9-5/8", 40 #, L-80, BTC-Mod
4", 9.5 #, L-80, SL-HT ~
3,952'
Total Depth
Top of open-hole gravel pack assembly abandoned across SV2 interval.
4,370' MD I
4,365' TVD
Date
05/03/00
Rev By
WSI
Comments
Proposed Completion Schematic
West Beach
WELL: WB-07
APl NO: 50-029-22949
Shared Services Drilling
North Slope Alaska
Alaska State Plane 4
PBU_ West Beach
WBeach-07- WB-07
Surveyed: 12 January, 2000
SURVEY REPORT
24 January, 2000
ORIGINAL
RECEIVED
~,q~ 26 2000
Your Reft API-500292294900
Surface Coordinates: 5982962.44 N, 687766.20 E (70° 21' 29.7129"N, 148° 28' 29.4249" W)
Kelly Bushing: 39.70ft above Mean Sea Level
DRILLING SERvIr'~s
Survey Ref: svy9610
A [**L,~L/.IBU~TON COMPANY
Sperry-Sun Drilling Services
Survey Report for WBeach-07- WB-07
Your Ref: API-500292294900
Surveyed: 12 January, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
0.00 0.000 0.000 -39.70 0.00
100.00 0.120 359.000 60.30 100.00
173.00 0.350 358.440 133.30 173.00
298.90 0.980 231.150 259.19 298.89
331.51 1.000 221.100 291.80 331.50
393.69 1.370 178.170 353.97 393.67
437.46 1.750 195.680 397.72 437.42
486.41 2.420 189.630 446.64 486.34
528.02 3.040 184.030 488.20 527.90
610.12 4.320 181.770 570.13 609.83
671.35 4.500 179.970 631.18 670.88
762.72 4.680 180.920 722.26 761.96
854.85 4.770 178.020 814.07 853.77
950.35 5.290 179.710 909.20 948.90
1046.45 5.580 180.250 1004.87 1044.57
1140.38 6.270 180.580 1098.30 1138.00
1235.69 5. 640 179.790 1193.09 1232.79
1329.82 4.740 168.940 1286.84 1326.54
1421.88 3.220 149.330 1378.68 1418.38
1516.87 3.280 124.400 1473.52 1513.22
1610.50 3.310 117.150 1567.00 1606.70
1707.22 2.740 100.910 1663.58 1703.28
1802.71 2.570 97.610 1758.97 1798.67
1896.51 0.420 67.380 1852.73 1892.43
1993.97 1.000 314.440 1950.19 1989.89
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
0.00 N 0.00 E
0.10 N 0.00 E
0.40 N 0.01 W
0.11 N 0.86 W
0.28 S 1.26 W
1.43 S 1.60 W
2.59 S 1.76 W
4.33 S 2.13 W
6.30 S 2.36 W
11.56 S 2.61 W
16.27 S 2.68 W
23.58 S 2.74 W
31.17 S 2.66 W
39.54 S 2.50 W
48.64 S 2.50 W
58.34 S 2.57 W
68.22 S 2.61 W
76.67 S 1.85 W
82.62 S 0.20 E
86.45 S 3.81 E
89.20 S 8.42 E
90.91 S 13.18 E
91.63 S 17.54 E
91.77 S 19.94 E
91.04 S 19.66 E
24 January, 2000 - 11:26
-2-
Alaska State Plane 4
PBU_West Beach
Dogleg
Rate
(°/100fi)
Vertical
Section
(ft)
Comment
5982962.44 N 687766.20
5982962.54 N 687766.20
5982962.84 N 687766.18
5982962.53 N 687765.34
5982962.13 N 687764.94
5982960.97 N 687764.64
5982959.80 N 687764.51
5982958.05 N 687764.18
5982956.08 N 687764.00
5982950.82 N 687763.88
5982946.11 N 687763.93
5982938.80 N 687764.06
5982931.22 N 687764.32
5982922.85 N 687764.69
5982913.75 N 687764.92
5982904.06 N 687765.09
5982894.17 N 687765.30
5982885.75 N 687766.28
5982879.85 N 687768.47
5982876.11 N 687772.17
5982873.48 N 687776.85
5982871.89 N 687781.65
5982871,28 N 687786.03
5982871.19 N 687788.44
5982871.92 N
E 0.00
E 0.120 -0.10
E 0.315 -0.40
E 0.972 -0.23
E 0.535 0:10
E 1.501 1.19
E 1.383 2.32
E 1.439 3.99
E 1.620 5.91
E 1.569 11.09
E 0.371 15.74
E 0.214 22.97
E 0.277 30.49
E 0.566 38.8O
E 0.306 47.82
E 0.735 57.41
E O.667 67.2O
E 1.411 75.66
E 2.194 81.85
E 1.478 86.14
E 0.446 89.50
E 1.058 91.86
E 0.239 93.18
E 2.364 93.66
687788.14 E 1.258 92.89
R OEIVED
Continued...
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for WBeach-07- WB-07
Your Ref: API-500292294900
Surveyed: 12 January, 2000
NOrth Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
2089.25 0.840 311.880 2045.46 2085.16
2183.73 1.300 314.430 2139.92 2179.62
2275.22 1.140 313.920 2231.39 2271.09
2369.93 1.350 320.080 2326.08 2365.78
2464.89 1.280 310.140 2421.01 2460.71
2558.40 1.240 312.280 2514.50 2554.20
2653.16 1.290 304.900 2609.24 2648.94
2749.26 1.370 303.580 2705.31 2745.01
2843.24 0.320 203.460 2799.28 2838.98
2937.90 0.740 176.360 2893.94 2933.64
3033.86 0.810 149.130 2989.89 3029.59
3128.21 0.740 167.130 3084.23 3123.93
3222.59 1.230 181.060 3178.60 3218.30
3315,27 1.140 177.350 3271.26 3310.96
3413.13 0.710 182.140 3369.10 3408.80
3507.06 0.810 162.630 3463.03 3502.73
3602.33 0.740 178.050 3558.29 3597.99
3696.27 0.660 190.760 3652,22 3691.92
3791.31 1.010 179.190 3747.25 3786.95
3886.62 0.970 189.080 3842.55 3882.25
3977.95 0.590 190.640 3933.87 3973,57
4038.46 0.780 196.790 3994.37 4034.07
4100.00 0.790 194.920 4055.91 4095.61
4260.64 0.750 184,850 4216.53 4256.23
4344.07 0.750 176.600 4299.96 4339.66
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
89.99 S 18.55 E 5982872.94 N 687787.00 E
88.78 S 17.27 E 5982874.12 N 687785.69 E
87.42 S 15.87 E 5982875.44 N 687784.26 E
85.91S 14.48 E 5982876.92 N 687782.83 E
84.37 S 12.95 E 5982878.42 N 687781.26 E
83.02 S 11.40 E 5982879.73 N 687779.68 E
81.72 S 9.77 E 5982880.99 N 687778.01 E
80.46 S 7.92 E 5982882.20 N 687776.14 E
80.08 S 6.88 E 5982882.56 N 687775.09 E
80.94 S 6.82 E 5982881.70 N 687775.04 E
82.14 S 7.20 E 5982880.51 N 687775.46 E
83.30 S 7.68 E 5982879.36 N 687775.97 E
84.91 S 7.80 E 5982877.75 N 687776.13 E
86.82 S 7.82 E 5982875.84 N 687776.20 E
88.40 S 7.85 E 5982874.26 N 687776.26 E
89.62 S 8.02 E 5982873.05 N 687776.47 E
90.88 S 8.24 E 5982871.80 N 687776.72 E
92.01S 8.16 E 5982870.66 N 687776.67 E
93.39 S 8.07 E 5982869.28 N 687776.61 E
95.03 S 7.96 E 5982867.64 N 687776.54 E
96.25 S 7.75 E 5982866.41 N 687776.36 E
96.95 S 7.57 E 5982865.71N 687776.20 E
97.76 S 7.34 E 5982864.89 N 687775.99 E
99.88 S 6.97 E 5982862.77 N 687775.67 E
00.97 S 6.96 E 5982861.68 N 687775.68 E
Alaska State Plane 4
PBU_West Beach
Dogleg
Rate
(°/lOOft)
Vertical
Section
(ft)
Comment
0.173
0.489
0.175
0.263
0.251
0.066
0.180
0.089
1.554
0.505
0.387
0.267
0.574
0.128
0.446
0.294
0.230
0.185
0.407
0.184
0.417
0.336
0.045
0,088
0,129
RECEIVED
91.70
90.32
88.78
87.09
85.35
83.80
82.28
8O.78
80.26
81.10
82.34
83.56
85.17
87.07
88.63
89.86
91.14
92.25
93.60
95.21
96.39
97.06
97.83
99.88
100.95
26 2000
Continued...
24 January, 2000 - 11:26 - - 3 - DriilQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for WBeach-07- WB-07
Your Ref: API-500292294900
Surveyed: 12 January, 2000
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
4370.00 0.750 176.600 4325.88 4365.58 101.31 S 6.98 E 5982861.34 N 687775.71 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 27.395° (04-Jan-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 172.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 4370.00ft.,
The Bottom Hole Displacement is 101.55ft., in the Direction of 176.061° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings Comment
(ft) (ft) (ft) (ft)
4370.00 4365.58 101.31 S 6.98 E Projected Survey
Dogleg
Rate
(°/100fi)
0.000
Alaska State Plane 4
PBU_West Beach
Vertical
Section
(ft)
Comment
101.29 Projected Survey
24 January, 2000 - 11:26
-4-
RECEIVED
2000
NadmOil & GasCons. ~n
DrillQuest 1.05.04e
STATE OF ALASKA
ALASKA q iL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: J~ Operation Shutdown J--J Stimulate J--J Plugging J--J Perforate
J--1 Pull Tubing J--J Alter Casing j--J Repair Well l--J Other
2. Name of Operator
ARCO Alaska Inc.
3, Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
69' NSL, 3429' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
29' SNL, 3422' WEL, SEC. 36, T12N, R14E, UM
At effective depth
32' SNL, 3422' WEU SEC. 36, T12N, R14E, UM
At total depth
32' SNL, 3422' WEL SEC. 36, T12N, R14E, UM
5. Type of well:
[--I Development
J--1 Exploratory
[--I Stratigraphic
J~ Service
6. Datum Elevation (DF or KB)
KBE = 39.7' AMSL
7. Unit or Property Name
West Beach
8.' Well Number
WB-07
9. Permit Number /Approval No.
~ 199-106 300-017
10. APl Number
50-029-22949-00
11. Field and Pool
Prudhoe Bay Field / Undefined
12. Present well condition summary
Total depth: measured 4370 feet
true vertical 4366 feet
Effective depth measured 4370 feet
true vertical 4366 feet
Plugs (measured) Set Retrievable Bridge Plug at 3900'
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length Size
120' 20"
4066' 9-5/8"
Cemented
250 sx Arcticset I (Approx.)
1069 sx Arcticset Lite 3, 276 sx 'G'
..ORI61NAL
Perforation depth:measured
true vertical
None - Open Hole from 4094' - 4370'
None - Open Hole TVD from 4090' - 4366'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 1_-80 to 2192'
MD TVD
120' 120'
4094' 4090'
RECEIVED
~1 EB 2 2 000
Ancho e
Packers and SSSV (type and measured depth) Gravel Pack Assembly: 9-5/8" Baker 'SCl' packer at 3952' with 4" bull plug at
4360'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
15. Attachments J~ Copies of Logs and Surveys run
J~ Daily Report of Well Operations
J6. Status of well classifications as:
F-I Oil l-1 Gas J-q Suspended
Service Water Supply for injection
17. I hereby cerHfy that the foregoing is true and correct to the best of my knowledge
SignedTerrieHubble '~_,,~_~, ~ Title TechnicaJAssistantlll
Prepared By Name/Number:
Date ¢~' ',,~--I ' O0 ~'
Ter'rie Hubble, 564-4628' ...... I
Submit In Duplica~
Form 10-404 Rev. 06/15/88
Performance Enquiry Report
Operator ARCO Date 00:00, 22 Feb 00 Page 1
Formation Integrity Test- West Beach 07
The analysis is from - 11:30, 12 Jan 00 - to - 11:30, 12 Jan 00
Programs in Result Table: WBEACH-07
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Depth MDR Hole Size MDR
WBEACH-07 Event 11:30, 12 Jan 00 11:30, 12 Jan 00 0 hr 0 min Obtained required level of integrity 9.6 4371.5 8-3/4
Progress Report
CONFIDENTIAL
Facility West Beach
Well WBEACH-07 Page 1
Rig Nabors 7ES Date 24 January 00
Date/Time
03 Jan 00
16:00-06:00
16:00-19:30
19:30
19:30-06:00
04 Jan 00 06:00-16:00
06:00-16:00
05 Jan 00
16:00
16:00-18:30
16:00-17:30
17:30
17:30-18:30
18:30
18:30-19:30
18:30-19:30
19:30
19:30-03:00
19:30-03:00
03:00
03:00-06:00
03:00-06:00
03:00-06:00
06:00-09:30
06:00-09:30
09:30
09:30-11:00
09:30-11:00
Duration
14hr
3-1/2 hr
10-1/2 hr
lOhr
10hr
2-1/2 hr
1-1/2 hr
1 hr
1 hr
1 hr
7-1/2 hr
7-1/2 hr
3 hr
3 hr
3 hr
3-1/2 hr
3-1/2 hr
1-1/2 hr
1-1/2 hr
Activity
Move rig
Rigged down Drillfloor / Derrick
Prepare to move rig.
Equipment work completed
Rig moved 75.00 %
Staged camp and pits on PM-1 pad. Moved sub off
well to West Beach 7. (Had delay in moving shop
ahead of sub due to Peak breakdown.) Finished R/U
diverter and setting pit liner and shims, prior to move
rig over conductor, at report time
Move rig (cont...)
Rig moved 100.00 %
Level pad behind cellar. Lay mats and herculite.
Spot wellhead equip behind rig. Move sub base over
cellar. Back pit module down access road. Lay
herculite and spot pits.
At well location - Cellar
Rig accepted at 1600 hrs, 1/4/2000.
Fluid system
Fill pits with Water
Spot cuttings tank, camp and shop. Finish berm
under rig. Take on water.
Completed operations
Held safety meeting
Held Pre-Spud safety meeting. Reviewed pre-spud
checklist, well plan, safety and environmental
expectations.
Completed operations
Test well control equipment
Tested Divertor
Finished R/U and function tested divertor. Test
witnesses by L. Grimaldi AOGCC.
Function test completed satisfactorily
Planned maintenance
Serviced Top drive
Changed saver sub XO and guide to 4-1/2" IF.
Installed 5-1/2" liners in pump #1. Load and tally 5"
drill pipe. N/U riser and flowline.
Equipment work completed
Run Drillpipe, 5in O.D.
Racked back Drillpipe
Finished PU 5" DP, HWDP and Jars.
Racked back Drillpipe
P/U and stand back 5" drill pipe to drill surface
hole.
Run Drillpipe, 5in O.D. (cont...)
Racked back Drillpipe (cont...) tJlt)~8 0{I &Ga$ Coos. C
P/U and stand back 5" drill pipe to drill surface
hole.
Required components racked in derrick
Perform integrity test
Tested Divertor
Function test divertor and pressure test surface
equipment. Held D3 divertor drill. Held pre-spud
lllCCtlll[ WlUl crew.
RECEIVED
0
nmi on
Facility
West Beach Well WBEACH-07 Page 2
Rig Nabors 7ES Date 24 January 00
Date/Time
Duration Activity
06 Jan O0
07 Jan 00
08 Jan O0
11:00
11:00-12:30 1-1/2 hr
11:00-12:30 1-1/2 hr
12:30
12:30-18:30 6 hr
12:30-18:30 6 hr
18:30
18:30-06:00
18:30-06:00
18:30-06:00
18:30-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:15
06:15
06:15-08:30
08:30
08:30-09:00
09:00
09:00-06:00
09:00-06:00
06:00-00:00
06:00-06:15
11-1/2 hr
11-1/2 hr
11-1/2 hr
11-1/2 hr
24 hr
24 hr
24 hr
1/4 hr
2-1/4 hr
1/2 hr
21hr
21 hr
18hr
1/4 hr
Function test completed satisfactorily
BHA run no. 1
Made up BHA no. 1
PU bit, motor and encounter resistance 7' below
ground level. PU jars, HWDP to drill out ice in
conductor.
Observed 20.00 klb resistance
BHA run no. 1
Washed to 169.0 ft
Drilled out ice obstruction in conductor. Drilled
to bottom of conductor plus enough rathole to PU
remaining BHA components (MWD, flex collars, HWDP,
jars, etc)..
No further resistance
BHA run no. 1
Drilled to 625.0 ft
Drilled from 2,170' to 2,238' MD.
Drilled to 625.0 ft
Drill from 625' to 2,170' MD per plan. Will make
wiper trip to BHA first stand down after 2,200'
MD.
Drilled to 625.0 ft
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). Some
packing off observed at 578' (pea gravel).
BHA run no. 1 (cont...)
Drilled to 2170.0 ft (cont...)
RECEIVED
· ooo
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). S°r/3~!88'~10/I& ~ tn-"m$
packing off observed at 578' (pea gravel).
BHA run no. 1 (cont...)
Drilled to 2238.0 ft (cont...)
Drilling ahead at 625' on plan. No problems with
close approach at 400' (no gyro needed). Some
packing off observed at 578' (pea gravel).
Began precautionary measures
Pulled out of hole to 912.0 ft
CBU and make wiper trip back up through permafrost
and gravels. Hole in good condition.
At top of check trip interval
R.I.H. to 2238.0 ft
RIH to 2,238' MD. No problems, no fill on bottom.
On bottom
Drilled to 4075.0 ft
Drilled from 4,075' to 4,096' MD. TD selected by
Geologist 160' below SV3 marker.
Drilled to 4075.0 ft
Drill from 2,238' to 4,075' MD. Geologist picked
TD at 4,096' MD using SV3 marker.
BHA run no. 1 (cont...)
Drilled to 4096.0 ft (cont...)
Drill from 2,238' to 4,075' MD. Geologist picked
TD at 4,096' MD using SV3 marker.
Progress Report
CONFIDENTIAL
Facility West Beach
Well WBEACH-07 Page 3
Rig Nabors 7ES Date 24 January 00
Date/Time
09 Jan 00
10 Jan 00
06:15
06:15-07:15
07:15
07:15-13:00
13:00
13:00-15:30
15:30
15:30-17:30
17:30
17:30-00:00
00:00
00:00-06:00
06:00-21:00
06:00-09:00
09:00
09:00-21:00
21:00
21:00-06:00
21:00-01:00
01:00
01:00-03:00
03:00
03:00-06:00
03:00-06:00
Duration
1 hr
5-3/4 hr
2-1/2 hr
2 hr
6-1/2 hr
6 hr
15hr
3 hr
12hr
9 hr
4 hr
2 hr
3 hr
3 hr
Activity
Reached planned end of run - Geological
Circulated at 4096.0 ft
CBU and check for flow. Blow down top drive.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 1660.0 ft
Make wiper trip to top of HWDP. Intermittent drag
(25-40k) in first 5-10 stands off bottom with
swabbing. Appearance of balled up stabilizer.
At top of check trip interval
R.I.H. to 4096.0 ft
RIH back to interval TD. Wash and ream through
tight spots at 1,800', 2,330' and 2,428' MD (0-5k
WOB).
On bottom
Circulated at 4096.0 ft
Pump 35 bbl pill (15 gal Condet, 5 sx nutplug, 1
gal SAPP) followed by 30 bbl hi vis sweep (2 sx
Barazan, 5 sx Barofiber). No appreciable cuttings
increase. Circ and cond for casing.
Obtained clean returns - 150.00 % hole volume
Pulled BHA
POOH with BHA #1. Drop ESS tool at 1,231' and
survey from 1,231' to 1,137' MD for JORPS. L/D BHA and
clear rig floor.
BHA Laid out
Run Casing, 9-5/8in O.D.
Run Casing, 9-5/8in O.D. (cont...)
Ran Casing to 3220.0 ft (9-5/8in OD)
Run casing to 3,220' MD without incident. Met
resistance at 3,220' MD. GR logs showed near top of
100' thick shale just above SV5 sands.
Began precautionary measures
Washed to 4096.0 ft
Wash and work casing to TD of interval. Appearance
of pushing obstruction ahead. Good pick up weights
and no packing off observed.
On bottom
Cement · Casing cement
Circulated at 4096.0 ft
Circulate and condition hole for 1 st stage cement
job.
Obtained req. fluid properties - 200.00 %, hole vol.
Mixed and pumped slurry - 162.000 bbl
Mix and pump 10 bbl water, 50 bbl spacer, drop -- -~
plug, 105 bbls lead, 57 bbls tail, drop plug and
displace with rig pumps. 1st stage cement in..~a$1~d~L__:.:=-_~.~?"
place at 0245 hrs. Bled off pressure and checked
float equipment - OK.
Tail cement pumped
Circulated at 2051.0 ft
Circulate through ES Cementer and condition mud for
2nd stage cement job.
Circulated at 2051.0 ft
Pressure up and open ES cementer. Circ and cond
tut ~IIU ~ta~ CClIIClIt JUU.
0
Progress Report
CONFIDENTIAL
Facility West Beach
Well WBEACH-07 Page 4
Rig Nabors 7ES Date 24 January 00
Date/Time
Duration
Activity
06:00-12:00
06:00-06:30
06:30
06:30-08:30
6 hr
1/2 hr
2 hr
Cement: Casing cement (cont...)
Circulated at 2051.0 ft (cont...)
Pressure up and open ES cementer. Circ and cond
for 2nd stage cement job.
Obtained clean returns - 300.00 % hole volume
Mixed and pumped slurry - 740.000 bbl
Pump 2nd stage cement. 10 bbl water, 75 bbl
viscosified spacer, 740 bbl 10.7# Arctic Set 3 slurry.
Drop closing plug, displace with rig @ 11 BPM. Bump
plug to 2,000 psi. Check for flow back - OK. CIP
0830 hrs.
11 Jan 00
08:30
08:30-09:30
09:30
09:30-12:00
12:00
12:00-06:00
12:00-14:00
14:00
14:00-15:00
15:00
15:00-21:30
21:30
21:30-00:00
00:00
00:00-06:00
00:00-06:00
06:00-10:30
06:00-10:30
1 hr
2-1/2 hr
18hr
2 hr
1 hr
6-1/2 hr
2-1/2 hr
6 hr
6 hr
4-1/2 hr
4-1/2 hr
Cement pumped
Volumes pumped equivalent to 412% excess in annulus
above ES Cementer.
Cleared Bell nipple
Flush and drain stack, clean possum belly and
shakers.
Equipment work completed
Rigged down Divertor
ND divertor, split bell nipple and lift divertor
stack.
Equipment work completed
Wellhead work
Installed Emergency hang off assembly
Set emergency slips with 75k over.
Equipment work completed, seal energised
Cut Casing at 24.0 ft
RU mud cap evacuation tool and "void" casing stub
to 30'. Make rough cut. Pull 9-5/8" casing stub,
RD mud evac tools.
Completed operations
Rigged down Divertor
Finish ND divertor assembly. Utilize heavy
equipment crane to remove divertor components from
cellar area. Clear cellar area of tools and
equipment.
Equipment work completed
Welded casing stub
Make final casing cut, preheat and weld transition
nipple onto 9-5/8" casing stub.
Completed operations
Tested Extension sleeve
Wait on transition nipple weld to cool. Once cool,
will pressure test same and begin NU BOPE.
Tested Extension sleeve
Wait on transition nipple to cool. RU and test
weld to 1,750 psi. NU 11" x 5k Tabasco style
head and test seal area to 1,000 psi for 10 mins.
Good test.
Wellhead work (cont...)
Tested Extension sleeve (cont...)
Wait on transition nipple to cool. RU and test
rl~L ......~..1~ ~..L.' ~ ._
....VY I,~1ul ,,1 4-~tk~ I, 1 ..JU""/=/~JJDI--~:. IN'NTTk.jT I I I' X ..)1%.~'!' I ¢2. U(J.~'k,L/ DI, J 'g tllUllIg
Facility
Date/Time
12 Jan O0
West Beach
Progress Report
Well WBEACH-07
Rig Nabors 7ES
CONFIDENTIAL
Page 5
Date 24 January 00
10:30
10:30-21:00
10:30-17:30
17:30
17:30-21:00
21:00
21:00-06:00
21:00-21:30
21:30
21:30-00:00
00:00
00:00-01:00
01:00
01:00-03:00
03:00
03:00-03:30
03:30
03:30-04:00
04:00
04:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00-11:00
06:00-08:00
08:00
08:00-08:30
08:30
08:30-10:30
10:30
10:30-11:00
11:00
11:00-11:30
Duration
10-1/2 hr
7 hr
3-1/2 hr
9 hr
1/2 hr
2-1/2 hr
1 hr
2 hr
1/2 hr
1/2 hr
1 hr
1 hr
1 hr
5 hr -
2 hr
1/2 hr
2 hr
1/2 hr
1/2 hr
Activity head and test seal area to 1,000 psi for 10 mins.
Pressure test completed successfully - 1000.000 psi
Nipple up All functions
Rigged up BOP stack
NU BOPE.
Equipment work completed
Tested BOP stack
Set test plug, RU and pressure test BOPE to 250 psi
low and 3,000 psi high. Test annular to 250 psi
low and 2,500 psi hish. Pull test plug. Set wear
bushing, RILDS.
Pressure test completed successfully - 3000.000 psi
BHA run no. 2
Held safety meeting
Hold PJSM and Technical Limit meeting.
Completed operations
Made up BHA no. 2
MU BHA #2 to 876' MD.
BHA no. 2 made up
R.I.H. to 2051.0 ft
RIH to ES Cementer.
Observed 20.00 klb resistance
Tag up on ES Cementer at 2,051' MD.
Drilled installed equipment - DV collar
Drill ES Cementer at 2,051' MD.
Completed operations
R.I.H. to 3940.0 ft
RIH to TOC at 3,940' MD.
Observed 25.00 klb resistance
Tag up on TOC.
Circulated at 3940.0 ft
Circulate bottoms up.
Obtained bottoms up (100% annulus volume)
Tested Casing - Via string
RU and pressure test 9-5/8" casing to 3,000 psi for
30 minutes. RD.
Pressure test completed successfully - 3000.000 psi
Drilled cement to 4015.0 ft
Drilling cement and shoe track.
Drilled cement to 4015.0 ft
Drilled cement, FE and 5' new hole to 4,101'
BHA run no. 2 (cont...)
Drilled cement to 4101.0 ft (cont...)
Drilled cement, FE and 5' new hole to 4,101' MD.
Completed operations
Circulated at 4101.0 ft
Circ bottoms up.
Obtained bottoms up (100% annulus volume)
Circulated at 4101.0 ft
Displace wellbore to 3% KCL BARADRILn.
Hole displaced with Water based mud - 100.00 % displaced
Drilled to 4116.0 ft
Drill 15' additional rathole for FIT.
Stopped: To perform FIT
Perform integrity test
Facility
West Beach
Progress Report
Well WBEACH-07
Rig Nabors 7ES
CONFIDENTIAL
Page 6
Date 24 January 00
Date/Time
13 Jan 00
11:00-11:30
11:30
11:30-19:30
11:30-14:00
14:00
14:00-16:00
16:00
16:00-19:30
19:30
19:30-06:00
19:30-20:30
20:30
20:30-22:30
22:30
22:30-23:30
23:30
23:30-01:00
01:00
01:00-02:00
02:00
02:00-06:00
Duration
1/2 hr
8 hr
2-1/2 hr
2 hr
3-1/2 hr
10-1/2 hr
1 hr
2 hr
1 hr
1-1/2 hr
1 hr
4 hr
Activity
Performed formation integrity test
Perform FIT to 9.6 ppg (0.5 ppg over MW).
Obtained required level of integrity - 9.6 ppg EMW
BHA run no. 2
Drilled to 4370.0 ft
Drill to 4,370' MD.
Reached planned end of run - Section / well T.D.
Circulated at 4370.0 ft
Circ and cond.
Obtained clean returns - 200.00 % hole volume
Pulled BHA
POOH with BHA #2. Clear rig floor.
BHA Laid out
BHA run no. 3
Made up BHA no. 3
PU BHA #3. Space out and MU tandem scrapers and
open bit.
BHA no. 3 made up
R.I.H. to 4370.0 ft
RIH with bit, scrapers to TD. No fill on bottom.
On bottom
Pulled out of hole to 2070.0 ft
Make short trip (bottom scraper just under ES
cementer).
At top of check trip interval
R.I.H. to 4370.0 ft
RIH to 4,370' MD. No fill.
On bottom
Circulated at 4370.0 ft
Spot 9.3 ppg Xanvis pill (2.5x open hole volume) in
open hole section. Pull 3 stands back up into
casing.
50.000 bbl LCM pill spotted downhole, LCM content 0.0 lb/bbl
Serviced Fluid system
Clean mud pits and all surface circulating
equipment in preparation of taking on -10 NTU
completion brine.
02:00-06:00
06:00-06:00
06:00-06:00
4 hr
24 hr
24 hr
Using HB&R oiler to keep stored brine warm
Serviced Fluid system
Clean mud pits and all surface circulating
equipment in preparation for completion brine.
Tiger tanks, DE unit, transfer pump spotted and
bermed with herculite. 1,200 bbls brine on
BHA run no. 3 (cont...)
Serviced Fluid system (cont...)
Clean mud pits and all surface circulating
equipment in preparation for completion brine.
14 Jan 00
06:00-06:00
06:00-07:00
24 hr
1 hr
Tiger tanks, DE unit, transfer pump spotted and
bermed with herculite. 1,200 bbls brine on location.
BHA run no. 3 (cont...)
Serviced Fluid system
Facility
Date/Time
15 Jan O0
Progress Report
CONFIDENTIAL
West Beach
Well WBEACH-07 Page 7
Rig Nabors 7ES Date 24 January 00
07:00
07:00-08:00
08:00
08:00-09:30
09:30
09:30-11:00
11:00
11:00-12:30
12:30
12:30-17:00
17:00
17:00-17:30
17:30
17:30-19:30
19:30
19:30-20:30
20:30
20:30-06:00
20:30-06:00
06:00-17:30
06:00-10:00
10:00
10:00-12:00
Duration
1 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
4-1/2 hr
1/2 hr
2 hr
1 hr
9-1/2 hr
9-1/2 hr
11-1/2 hr
4 hr
2 hr
Activity lines.
Equipment work completed
Held safety meeting
Hold PJSM for displacing well from mud to brine.
Spot trucks, HAZMAT trailer and rig up circulating
lines.
Completed operations
Circulated at 4074.0 ft
Displace BARADRLn mud system from wellbore. Pump
50 bbl hi vis spacer followed by 350 bbl of 8.7 ppg
filtered brine.
Hole displaced with Brine - 200.00 % displaced
Cleared Flowline
Clean surface equipment (flowline, auger, etc)
contaminated by mud returns. Take on additional brine
in rig pits.
Equipment work completed
Circulated at 4074.0 ft
PJSM with Baroid prior to pumping caustic pills.
RU and pump caustic wash down drillstring.
String displaced with Brine - 100.00 % displaced
Circulated at 4074.0 ft
RU Vac truck to annulus and circulate out caustic
pill slowly to ensure fluids do not enter rig
system. Rotate and reciprocate drillstring while
circulating caustic up annulus.
Obtained clean returns - 150.00 % hole volume
Held safety meeting
PJSM with Dowell prior to pumping acid pickle.
Completed operations
Circulated at 4074.0 ft
Pump DP acid pickle - 5 bbl brine, 10 bbl Xanvis
(2.5 ppb), 10 bbl of 9.0 ppg brine tubing wash, 12
bbl of 15% HCL and displace to within 0.5 bbl of bit
with Dowell.
String displaced with Acid - 100.00 % displaced
Reverse circulated at 4074.0 ft
Close annulur and reverse out acid pickle with rig
pumps. Take clean brine to pits, diverting acid
pickle back to cuttings box.
String displaced with Brine - 150.00 % displaced
Serviced Fluid system
Filter brine in rig pits. Targeting minimum 400
bbls at 20 NTU's before circulating.
Serviced Fluid system
Filter brine in rig pits. Achieved targeted
minimum of 2 hole volumes at surface with <20
NTU's.
BHA run no. 3 (cont...)
Serviced Fluid system (cont...)
Filter brine in rig pits. Achieved targeted
minimum of 2 hole volumes at surface with <20
NTU's.
Equipment work completed
Circulated at 4074.0 ft
'-': .... '-'- 2 ,_A, .... , .....of -'--- ":' .... brine
~.~11 u tlldtCIIUIU V UI UlIIU3 ¢l~all 111 tut ~d
Facility
Date/Time
16 Jan O0
West Beach
Progress Report
Well WBEACH-07
Rig Nabors 7ES
CONFIDENTIAL
Page 8
Date 24 January 00
12:00
12:00-13:30
13:30
13:30-17:30
17:30
17:30-06:00
17:30-18:00
18:00
18:00-04:30
04:30
04:30-06:00
04:30-06:00
06:00-00:00
06:00-07:00
07:00
07:00-08:00
08:00
08:00-09:00
09:00
09:00-10:00
10:00
10:00-10:30
10:30
10:30-13:30
Duration
1-1/2 hr
4 hr
12-1/2 hr
1/2 hr
10-1/2 hr
1-1/2 hr
1-1/2 hr
18hr
1 hr
1 hr
1 hr
1 hr
1/2 hr
3 hr
Activity into wellbore. Returns cleaned up to 11 NTU's.
Hole displaced with Brine - 200.00 % displaced
R.I.H. to 4370.0 ft
Trip in hole slowly. Tag bottom at 4,370' MD. No
fill ! !
On bottom
Pulled BHA
POOH slowly. Drop 2.375" rabbit. LD scrapers,
jars, bit sub and bit. Clear rig floor.
BHA Laid out
4.590 in. Screen assembly workstring run
Held safety meeting
Hold PJSM for running GP completion.
Completed operations
Ran Drillpipe in stands to 4370.0 ft
Run Gravel Pack screens using false
rotary. RU and run 2-7/8" innerstring, tag, space
out, PU GP packer. RIH with assembly on 5" DP at
3 min per stand. Tag bottom, PU 2 DP pups and
space out with DP connection just above annular.
On bottom
Rigged up High pressure lines
Finish RU high pressure Dowell lines. Change over
to long bails.
Rigged up High pressure lines
RU Dowell high pressure lines. Swap out to long
bails on top drive.
4.590 in. Screen assembly workstring run (cont...)
Rigged up High pressure lines (cont...)
RU Dowell high pressure lines. Swap out to long
bails on top drive.
Equipment work completed
Functioned Gravel pack tool
Pump 5 bbl brine to clear ball seat, drop ball and
pressure up to set gravel pack packer. Release
from same.
Equipment work completed
Reverse circulated at 3959.0 ft
Reverse out packer setting ball and recover same.
String displaced with Brine - 250.00 % displaced
Circulated at 3959.0 ft
Pump 60 bbl brine to displace high visc Xanvis pill
from open hole. Once inside casing, reverse out
same. Returns to cuttings tank.
Obtained clean returns - 150.00 % hole volume
Held safety meeting
PJSM for gravel pack.
Completed operations
Gravel pack - 427.000 bbl pumped at 1100.0 psi, screen out at 2900.0 psi
Establish circ rates. Pump 5,000 gal acid stim,
427 total bbl brine/sand slurry. Screen out
early. Est. 7150 # sand pumped before screen out.
Held morning tour crew over for I hour to ensure
smooth turnover during critical operation.
Facility
West Beach
Progress Report
Well WBEACH-07
Rig Nabors 7ES
CONFIDENTIAL
Page 9
Date 24 January 00
Date/Time
17 Jan 00
13:30
13:30-16:00
16:00
16:00-17:00
17:00
17:00-18:00
18:00
18:00-18:30
18:30
18:30-19:30
19:30
19:30-00:00
00:00
00:00-06:00
00:00-01:00
01:00
01:00-03:30
03:30
03:30-06:00
03:30-06:00
06:00-12:00
06:00-08:00
08:00
08:00-08:30
Duration
2-1/2 hr
1 hr
1 hr
1/2 hr
1 hr
4-1/2 hr
6 hr
1 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
6 hr
2 hr
1/2 hr
Activity
Aborted gravel pack
Reverse circulated at 3959.0 ft
Reposition gravel pack tool after screen out and
reverse out sand from drillsting. Took returns over
shakers and sand to cuttings box. Est 2,000 # sand
reversed out.
Obtained clean returns - 300.00 % hole volume
Circulated at 3959.0 ft
RU and attempt to circulate through gravel pack
with rig pumps. 1 BPM @ 1,500 psi. Shutdown.
Began precautionary measures
Removed High pressure lines
Blow down and RD Dowell high pressure lines.
Equipment work completed
Pulled out of hole to 3587.0 ft
POOH 4 stands to clear inner workstring from gravel
pack assembly. LD pup joints.
Began precautionary measures
Rigged up Drillstring handling equipment
Change over to short bales.
Equipment work completed
Pulled out of hole to 0.0 ft
POOH. LD 2-7/8" inner string.
At BHA
2-7/8" inner gravel pack string laid out.
BHA run no. 4
Made up BHA no. 4
MU Baker SC-1 Packer Retrieving Tool, XO, 2-Bumper
Subs, 23 HWDP.
BHA no. 4 made up
R.I.H. to 3959.0 ft
RIH and wash slowly to top of gravel pack packer.
Snap in, latch and unseat packer.
Began precautionary measures
Pulled out of hole to 3600.0 ft
POOH slowly with fish.
Pulled out of hole to 3600.0 ft
POOH slowly, working GP assembly up and down
through sand. Targeted max overpull of 40k.
Pulled screens above 9-5/8" shoe by 0500 hrs.
Pump out first 3 stands (very slow pull) to keep
top drive from freezing. POOH slowly, monitoring
fluid levels.
BHA run no. 4 (cont...)
Pulled out of hole to 411.0 ft (cont...)
POOH slowly, working GP assembly up and down
through sand. Targeted max overpull of 40k.
Pulled screens above 9-5/8" shoe by 0500 hrs.
Pump out first 3 stands (very slow pull) to keep
top drive from freezing. POOH slowly, monitoring
fluid levels.
Fish at surface
Held safety meeting
PJSM on LD packer and gravel pack screens.
Facility
Date/Time
18 Jan O0
Progress Report
CONFIDENTIAL
West Beach
Well WBEACH-07 Page 10
Rig Nabors 7ES Date 24 January 00
08:30
08:30-12:00
12:00
12:00-13:00
12:00-13:00
13:00
13:00-19:00
13:00-19:00
19:00
19:00-04:00
19:00-21:00
21:00
21:00-23:30
23:30
23:30-00:30
00:30
00:30-03:30
03:30
03:30-04:00
04:00
04:00-06:00
04:00-06:00
04:00-06:00
06:00-06:00
06:00-08:30
08:30
08:30-09:00
09:00
09:00-13:30
13:30
13:30-14:30
14:30
14:30-16:00
Duration
3-1/2 hr
1 hr
1 hr
6 hr
6 hr
9 hr
2 hr
2-1/2 hr
1 hr
3 hr
1/2 hr
2 hr
2 hr
2 hr
24 hr
2-1/2 hr
1/2 hr
4-1/2 hr
1 hr
1-1/2 hr
Activity
Completed operations
Laid down fish
LD gravel pack packer and gravel pack screens. No
apparent damage. 100% recovery, including all
centralizers. LD fishing BHA.
Complete fish recovered
Derrick management
Rigged down Drillstring handling equipment
RD fish and BHA handling equipment and clear floor.
Equipment work completed
Test well control equipment
Tested BOP stack
Pull wear bushing, install test plug. RU and test
BOPE to 250 psi low and 3,000 psi high. Pull test
plug, install wear bushing.
Function test completed satisfactorily
BHA run no. 5
R.I.H. to 4094.0 ft
MU clean out BHA and RIH to 9-5/8" shoe.
At 9-5/8in casing shoe
Circulated at 4094.0 ft
Take on additional clean brine. Circulate 2 hole
volumes, establishing pump rates, pressures and
percent returns.
Hole displaced with Brine - 200.00 % displaced
R.I.H. to 4360.0 ft
Trip into open hole slowly looking for fill. Tag
up at 4,360' MD (10' fill).
Observed 5.00 klb resistance
Pulled out of hole to 724.0 ft
POOH slowly to clean out BHA.
At BHA
Pulled BHA
LD BHA #5. Clear rig floor.
BHA Laid out
4.590 in. Screen assembly workstring run
Ran Drillpipe in stands to 200.0 ft
PU and run gravel pack screen assembly.
Ran Drillpipe in stands to 200.0 ft
RIH w/gravel pack screens on drill pipe.
4.590 in. Screen assembly workstring run (cont...)
Ran Drillpipe in stands to 610.0 ft (cont...)
RIH w/gravel pack screens on drill pipe.
Began precautionary measures
Pulled out of hole to 413.0 ft
L/D knock out isolation valve.
Stopped · At sub-assembly
Ran Drillpipe in stands to 4364.0 ft
At Setting depth · 4364.0 ft
Rigged up High pressure lines
R/U Dowell to pump on well. Changed bails on top
drive to make room for circ equipment.
Equipment work completed
Set packer at 3951.0 ft with 2500.0 psi
1-% ..... ~1 L~ll ~_~1 11£~11 +~ 1~11 1~
Facility
Date/Time
19 Jan O0
Progress Report
CONFIDENTIAL
West Beach
Well WBEACH-07 Page 11
Rig Nabors 7ES Date 24 January 00
16:00
16:00-19:00
19:00
19:00-19:30
19:30
19:30-21:00
21:00
21:00-22:00
22:00
22:00-23:00
23:00
23:00-00:00
00:00
00:00-01:30
01:30
01:30-02:30
02:30
02:30-03:30
03:30
03:30-05:30
05:30
05:30-06:00
06:00-10:00
06:00-06:30
06:30
06:30-08:30
08:30
08:30-10:00
10:00
10:00-11:00
10:00-11:00
11:00
11:00-23:30
11:00-12:00
12:00
12:00-12:30
12:30
12:30-17:30
Duration
3 hr
1/2 hr
1-1/2 hr
1 hr
1 hr
1 hr
1-1/2 hr
1 hr
1 hr
2 hr
1/2 hr
4 hr
1/2 hr
2 hr
1-1/2 hr
1 hr
1 hr
12-1/2 hr
1 hr
1/2 hr
5 hr
Activity to 2500 psi to set gravel packer. P/U and S/D 15K
Packer set at 3957.0 ft
Reverse circulated at 3951.0 ft
Rev circ ball. Ball became lost in chicksan when
changed out, found ball.
Stopped: To hold safety meeting
Held safety meeting
Completed operations
Gravel pack - 189.000 bbl pumped at 1450.0 psi, screen out at 2400.0 psi
R/U Dowell and pressure test lines to 5000 psi.
Pumped gravel pack slurry, 189 bbls total. Pumped
5700 # sand and screened out.
Aborted gravel pack
Reverse circulated at 3951.0 ft
Reverse circ sand from drill pipe.
Obtained clean returns - 800.00 % hole volume
Injectivity test - 14.000 bbl injected at 750.0 psi
Establish injection rates.
Completed injectivity test
Monitor wellbore pressures
Observed well static
Gravel pack - 2880.000 bbl pumped at 1250.0 psi, screen out at 2550.0 p:
Screened out with 2880 lbs sand pumped, 500 #
behind pipe.
Aborted gravel pack
Reverse circulated at 3951.0 ft
Reverse out sand, 8 bpm 600 psi.
Obtained clean returns - 200.00 % hole volume
Injectivity test - 14.000 bbl injected at 750.0 psi
1 bpm = 150 psi 2 bpm = 350 psi 3 bpm = 750 psi
Completed injectivity test
Reverse circulated at 3951.0 ft
Reverse circulate 400 bbls clean brine.
Hole displaced with Brine ~ 200.00 % displaced
Removed High pressure lines
R/D Dowell lines. Prep to POH for logs.
4.590 in. Screen assembly workstring run (cont...)
Removed High pressure lines (cont...)
R/D Dowell lines. Prep to POH for logs.
Equipment work completed
Pulled Drillpipe in stands to 3950.0 ft
Stopped: To change handling equipment
Laid down 353.0 ft of Tubing
12 joints laid out
Planned maintenance
Serviced Top drive
Equipment work completed
Electric wireline work
Rigged up Logging/braided cable equipment
Equipment work completed
Held safety meeting
Completed operations
Conducted electric cable operations
P/U RST gravel pack logging tool and RIH to 4357'
WLM. Made 3 passes to 3950'.
Facility
Date/Time
20 Jan O0
West Beach
Progress Report
Well WBEACH-07
Rig Nabors 7ES
CONFIDENTIAL
Page 12
Date 24 January 00
17:30
17:30-22:30
22:30
22:30-23:30
23:30
23:30-06:00
23:30-00:00
00:00
00:00-02:30
02:30
02:30-03:30
03:30
03:30-06:00
06:00-08:00
06:00-08:00
08:00
08:00-08:30
08:00-08:30
08:30
08:30-12:30
08:30-09:30
09:30
09:30-12:30
12:30
12:30-13:00
12:30-13:00
13:00
13:00-19:00
13:00-15:00
15:00
15:00-18:00
18:00
18:00-19:00
19:00
Duration
5 hr
1 hr
6-1/2 hr
1/2 hr
2-1/2 hr
1 hr
2-1/2 hr
2 hr
2 hr
1/2 hr
1/2 hr
4 hr
1 hr
3 hr
1/2 hr
1/2 hr
6 hr
2 hr
3 hr
1 hr
Activity
Completed logging run with Production logging tools from 4357.0 ft
3950.0 ft
Conducted electric cable operations
Logging run #2. USIT log from 3940' to surface.
Completed logging run with Cement evaluation tool from 3940.0 ft tc
ft
Rigged down Logging/braided cable equipment
Equipment work completed
5in. Drillpipe workstring run
Rigged up sub-surface equipment - Bridge plug
P/U HES 9-5/8" model III retrievable bridge plug.
Equipment work completed
Ran Drillpipe in stands to 3900.0 ft
At Setting depth: 3900.0 ft
Tested Bridge plug - Via string
Set RBP at 3900'. Tested 9-5/8" casing and RBP to
2000 psi, OK
Pressure test completed successfully - 2000.000 psi
Laid down Drillpipe of 2700.0 ft
POH LDDP.
5in. Drillpipe workstring run (cont...)
Laid down 3900.0 ft of Drillpipe (cont...)
POH LDDP.
126 joints laid out
Wellhead work
Removed Wear bushing
Equipment work completed
Run Tubing, 4-1/2in O.D.
Rigged up Tubing handling equipment
PJSM. Finish R/U to run tubing.
Equipment work completed
Ran Tubing to 2191.0 ft (4-1/2in OD)
Ran 53 jts 4-1/2", IBT-M, L-80 tbg. P/U tubing
hanger, install dummy penetrators. Run allignment
pin, land tubing. RILDS.
Hanger landed
Wellhead work
Installed Hanger plug
Installed TWC.
Equipment work completed
Nipple down BOP stack
Rigged down BOP stack
N/D mousehole, flow line, turnbuckles. Left 4
bolts in BOP.
Stopped: To service drilling equipment
Serviced Blind / Shear ram
Open blind ram doors. Inspect hydraulic rams for
wear. Function with accumulator. Clean and close
doors. (One side functions tight, had problems
previously).
Equipment work completed
Removed BOP stack
Finished remove BOP stack.
Equipment work completed
~O
Facility
Date/Time
21 Jan O0
Progress Report
CONFIDENTIAL
West Beach
Well WBEACH-07 Page 13
Rig Nabors 7ES Date 24 January 00
19:00-23:00
19:00-22:30
22:30
22:30-23:00
23:00
23:00-06:00
23:00-00:00
00:00
Duration
4 hr
3-1/2 hr
1/2 hr
7 hr
1 hr
Activity
Wellhead work
Installed Xmas tree
Install adapter flange. N/U tree and pressure test
to 3000 psi.
Equipment work completed
Removed Hanger plug
Pulled TWC.
Equipment work completed
Fluid system
Freeze protect well - 155.000 bbl of Diesel
Pumped 155 bbls freeze protect with HBR. Set BPV.
Completed operations
Released rig for move to D- 12 RWO @ 2400 hrs
1/20/2000.
Scblmberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 121141
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
Color
Well Job # Log Description Date Print Sepia CD
WB-07 20049 USIT 000119 I
mr ,-r" I% i -I~
~. lq[.Lrl V '!.)
1/27/00
"I'~~ /~ FEB 04 2000
SIGNED DATE:
Alask~ 0il & G~ Cons. (;ommission
Anchorage
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
24-Jan-00
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Well WB-07
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
'MD
4,370.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Kenneth W. Allen
Survey Manager
Attachment(s)
RECEWE )
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION CL, MMISSION
APPLICATION FOR SUNDRY APPROVAL
Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator
ARCO Alaska Inc.
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
69' NSL, 3429' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
5251' NSL, 3422' WEL, SEC. 36, T12N, R14E, UM
At effective depth
5248' NSL, 3423' WEL, SEC. 36, T12N, R14E, UM
At total depth
5248' NSL, 3423' WEL, SEC. 36, T12N, R14E, UM
(Not Final)
(Not Final)
(Not Final)
.
Datum Elevation (DF or KB)
Plan RKB = 41.2'
7. Unit or Property Name
West Beach
8. Well Number
WB-07
9. Permit Number
199-106
10. APl Number
50- 029-22949-00
11.
Field and Pool
Prudhoe Bay Field / Undefined
12. Present well condition summary
Total depth: measured 4370 feet
true vertical 4366 feet
Effective depth: measured 4370 feet
true vertical 4366 feet
Plugs (measured)
Junk (measured)
ORIGINAL
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length Size
120' 20"
4066' 9-5/8"
Cemented
250 sx Arcticset I (Approx.)
1069 sx Arcticset Lite 3, 276 sx 'G'
MD TVD
120' 120'
4094' 4090'
RECEIVED
Perforation depth:
measured
true vertical
None - Open Hole from 4094' - 4370'
None - Open Hole TVD from 4090' - 4366'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 2192' (Kill String)
AJaska Oil & Gas Cons. C0mmJss~oj,
Anchorage
Packers and SSSV (type and measured depth) Gravel Pack Assembly: 9-5/8" Baker 'SCl' packer at 3952' with 4" bull plug at
4360'
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation
January 19, 2000
16. If proposal was verbally approved
Blair Wondzell !~"20¥
Name of approver
1/19/2000
Date approved
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service Water Supply for Injection
contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Dan Stone ~i~'~-- ;"r'-)~ .,.~"~----"~ Title Senior Drilling Engineer Date ~//Z~!
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Approval
Plug integrity_ BOP Test~ Location clearance
Mechanical Integrity Test__ Subsequent form required 10-
ORIGINAL
Approved by order of the Commission RO_t2.~rt N Christenson C~.mmissioner
Form 10-403 Rev. 06/15/88 ~"" ~)
Date
Submit In Triplicate
)eare.d
rvlces
rillin.q
Mr Blair Wondzell
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
(907) 279-1433
(907) 276-7542 (fax)
January 20, 2000
Re: Suspension of Operations on West Beach Well WB-07 (Nabors Rig #7ES)
Dear Mr. Wondzell,
As per our telephone conversation on January 19, 2000, this letter is to confirm the suspension of
operations on West Beach Well WB-07 (Permit #199-106). The well was drilled as planned to the
proposed target, however due to complications encountered during operations to gravel pack the
production interval the well could not be completed. Two separate attempts were made to gravel
pack the desired interval and both were unsuccessful after 'screening-out' early, with less than half
the anticipated gravel volume behind the screens. To allow a detailed evaluation of the plan
forward, operations on WB-07 are being suspended. Estimates for re-entering the well to
commence further gravel pack and completion operations is within 6 months.
Attached is a schematic of the planned well condition as suspended. If you have any questions or
require any additional information on this matter, please contact me at 564-5521.
Sincerely,
William S. Isaacson
Drilling Engineer
Share Services Drilling
J~ _~~.hared
~ _',~~ervices
~~ ~ rilling
Alaska ~
Nab ors 7ES
WB-07 Well Plan Addendum
BP Explorati'0n i ARCO Ala'Ska
Well Sus ension 0 erations
1. Once E-line logging operations are complete, PU Halliburton Model '3L' 9-5/8" Retrievable Bridge Plug and
RIH on 5" DP. Set bridge plug +/-50' above the Gravel Pack packer at ~3952' MD. Release from bridge plug
and test 9-5/8" casing to 2000 psi for 30 minutes. POOH and lay down all DP.
2. RIH with 4-1/2" tubing to ~2200' MD and hang off on tubing hanger. Tubing hanger should be left with dummy
penetrators in all ports (heat trace, ESP, and '1' wire) if possible, otherwise actual penetrators may need to be
run.
3. Install TWC. ND BOP and NU adapter flange with 4-1/16" valve and tree cap. (Horizontal tree should be
equipped with 4-1/16" valve and blind flange.) Pressure test cavity to 3000 psi, testing adapter flange, hanger
seals, and penetrator seals. Test trees to 3000 psi. Pull TWC.
4. Freeze protect the well by displacing to diesel around the 4-1/2" tubing string.
$. Install BPV. Secure Well. Rig down and release rig.
RECEIVED
,IAN 2 1 2000
'qnc~oraoe
WB-07 Planned Suspension Condition
Tree: Horizontal FMC 4-1/16" 5M L-80
Wellhead: FMC ARCO Tabasco 11' x 5M psi
20", 91.5#, H-40 I 120'
Diesel Freeze Protect displaced to -2192' MD
9-5/8", 40 #, L-80, BTC-Mod
4", 9.5 #, L-80, SL-HT I 4,360' I
.:.:.
8.$ ppg 4% KGI
Kill Weight Brine
oo ~ ~*
io°Oo ~ oo
°-0 ' 0~{}~i~
Total Depth
Cellar Box Elev: 11.2'
Rig 7ES RKB = 39.7'
4-1/2" 5M psi FMC Eccentrick Tubing Hanger landed in wellhead with 4-1/2" 12.6# L-80,
IBTC-Mod Kill String run to 2192' MD
Retrievable Bridge Plug set at 3900' MD.
GmvP. I P~c.k A~.~emhl.v with P~c. ker .~P.t Rt: '1 3,952' I
9-5/8" 40#/ft 'SC-I' Gravel Pack Packer
I
I
- Gravel Pack Extension Sleeve
- Lower Extension with crossover to 4" 9.5# SL-HT
- 4" 9.5# SL-HT Blank Pipe as Required
- 4" 9.5# SL-HT 8 gauge Gravel Pack Screen as Required (with centralizers)
- 4" Gravel Pack Bull Plug
RECEIVED
4,370' MD
4,365' TVD
JAN 21 000
N~~ & Gmj Oons. (~mmisslon
Anchorage
Date
Rev By
WS!
Comments
Proposed S, mp~nsion ._qchem~tic
West Beach
WELL: WB-07
APl NO: 50-029-22949
Shared Services Drilling
WB-07 Permit to Drill
Subject: WB-07 Permit to Drill
Date: Fri, 3 Dec 1999 11:41:42-0500
From: "Hubble, Terrie L (NANA)" <HubbleTL~BP.com>
To: "'Fleck, Diana (AOGCC)'" <Diana Fleck~admin. state.ak.us>,
"'Hebert, Shelly (AOGCC)'" <Shelly_Hebert~admin. state.ak.us>
CC: "Isaacson, Bill S (ARCO)" <IsaacsWS~BP.com>
> Hi Diana or Shelly,
We submitted the Permit to Drill for this well on 10/27/9.9. While the
planned Spud Date is mid-December, we would like to request that this 10-401
be signed and returned. We understand that it has been reviewed and
approved by Blair Wondzell and/or Tom Maunder and it is just waiting for
Commissioner reviews and signature. While we realize that the Commission's
intent is to have these forms returned by the date of planned work we feel
that it has been submitted with adequate advance notice that we would like
to request that it be approved so that it can be processed with the main
package that will go out to those who will be conducting the work. Since
this is a confidential well, the routine is a bit more rigorous than it is
for non-confidential wells.
> We apologize for any inconvenience that this may cause and appreciate any
> help you can provide. Thankst.
l of 1 12/3/99 8:09 AM
TON Y KNO WL ES, (30 VEFINOFI
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stone
Senior Drilling Engineer
ARCO Alaska Inc.
P O Box 196612
Anchorage, AK 99519-6612
R.e~
West Beach WB-07
ARCO Alaska Inc.
Permit No: 199-106
Sur Loc: 69'NSL, 3429'WEL, Sec. 25, T12N, R14E, UM
Btmhole Loc. 5254'NSL, 3416'WEL, Sec. 36, T12N, R14E, UM
Dear Mr. Stone:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Robert N. Christenson, P.E.
Chair
BY ORDER OF TH~/_COMMISSION
DATED this(.~,,,¢~ day of December, 1999
dlf/Enclosures
cc~
Department of Fish & Gmne. Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
.... STATE OF ALASKA
ALASh. ,. OIL AND GAS CONSERVATION CC
PERMIT TO DRILL
20 AAC 25.005
.,,IlSSION
CONFIDENTIAL
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
~i Name of Oper~{~)~' ........ 5. Datum F!:i~vation'(DF or KB) 10. Fieldand Pool '"
ARCO Alaska Inc. Plan RKB = 41.2' ,, Prudhoe Bay Field._/~e's~'
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028301 . B_~eaeh'
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
~....69' NSL, 3429' WEL, SEC. 25, T12N, R14E, UM West Beach
l, ,, At top of productiv,e interval 8. Well Number ' Number U-630610
;~..,1.6'~SL, 3416 WEL, SEC. 36, T12N, R14E, UM WB-07
,,.. i At total depth , 9. Approximate SpUd date Amount $200,000.00
,!/'I'~NSL, 3416 WEL, SEC. 36, T12N, R14E, UM 12/15/99
12. Distance to n'~'&rest pro,perry line113. D'i'~a'nCe to nearest well 14."Number of acres in property 15. PropoSed depth (MD and TVD)
ADL 034628, 3416 MD ................ I .... No Close Approach 2560 4355' MD / 4351' TVD
16. To be c~'r~P'leted f(~'~; deviated wells ...... 17. Anticipated I~'~essure 'i;;e 2~ AAC 25.035 (e) (2)} .................
Kick Off Depth 300' MD Maximum Hole Angle 5° Maximum surface 1350 psig, At total depth (TVD) 3990' / 1750 psig
18. Casing Program Setting Depth
.... Size Specifications ,Top, Bottom ,Quantity of Cement
Hole Casing "~ei'ght Grade '" Coupl'i'~g Length MD TVD MD TVD (include stage data) ....
30" 20" 91.5# H-40 WLD 80' Surface Surface 120' 120' 250 sx Arcticset I ,, /, ,A, , ,p p, rox./
12-1/4" 9-5/8" 40# L-80 BT(~'-M 4075' 30' 30' 4105' 410':1' 1004 sx Articset Lite 3, 276 sx 'G'
'8-'3/4" 4" * 9.5# L-80 '"~L-HT 355' 4000' 3996' 4355' 4351' Uncemented, Gravel Pack Assembly
19. To be completed for Redrill, Re-entry, and D'eepen Operation's'i ............................
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
LPirn°edrUCti°n 0 R I GI NA L RECEIVE D
OCT 2 s t999
Perforation depth: measured Naska 0il & Gas Cons. Commission
true vertical Anchorage
20. Attachments I~ Filing Fed ............... [] I~roperty Plat [] BoP Skeich [] Diver~'er'Sketch [] Dril'i'i'ng Program ..................
[] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~..~,,.~_______~
Dan Stone ~'~ ~ Title Senior Drilling Engineer Date ~' ~/~"f
Commission Use Only
Permit Number I APl Numbe]- I, .. Approval_Date I See cover letter
for other requirements
Conditions of Approval: Samples Required [].Yes ~o Mud Log Required [] Yes
Hydrogen Sulfide Measures J~'Yes [] No Directional Survey Required ~]~'Yes [] No
Required Working Pressure for mOPE r-I 2K; ~4~K; [] 4K; [] 5K; [] 10K; I--I 15K
Other:
ORIGINAL SIGNED. BY by order of
Approved By Robert N. Christen~nn Commissioner the commission Date /O
Form 10-401 Rev. 12-01-85
Submit In Triplicate
WB-07 Permit to Drill
r Well Name: I WB-07
CONFIDENTIAL
Drill and Complete Plan Summary
I Type of Well (service / producer / injector): J Service Well - Water Source Well
Surface Location: X = 687766.20 Y = 5982962.44
69' FSL 3429' FEL S25 T12N R14E Umiat
Target Location: 1632' FSL 3416' FEL S36 T12N R14E Umiat
Bottom Hole Location: 5253' FSL 3416' FEL S36 T12N R14E Umiat
I AFE Number: 12D0078 I
I Estimated Start Date: 112/15/99
I~D:1~355' I I TVD: 1435~' I
I Rig: I Nabors7ES
I Operating days to complete: 110
I BF/MSL: 111.2' I I RKB'
141.2'
I Well Design (conventional, slimhole, etc.): I Slimhole
I Obiective: I
Water source well for West Beach Field waterflood
Mud Program:
12-1/4" Surface Hole (0-4105'): Fresh Water Surface Hole Mud
Interval Density Viscosity YP LSR YP Gel-10 Fluid
(ppg) (seconds) sec Loss
Initial 8.6-9.3 300-200 70-50 30-40 35-55 12-15
SV5 9.2-9.4 150-200 50-30 18-11 20-35 6-8
Interval TD 9.2-9.4 80-100 20-35 8-15 20-35 6-8
8-3/4" Production Hole (4105'-4355'): 3% KCI Drill-in Fluid (BaraDrill)
Interval Density Viscosity YP LSR YP pH HTHP
(ppg) (seconds) Filtrate
Entire 9.0 35-45 18-25 4-7 8.0-8.5 10cc
Interval
WB-07 Permit to Drill
CONFIDENTIAL
Directional:
KOP: 1300'
Maximum Hole Angle:
Close Approach Well-
5° at 800'- Nudge well to south to avoid close approach
None - All wells pass close approach guidelines.
Logging Program:
Surface
Production Hole
Drilling: MWD / GR
Open Hole: None
Cased Hole: None
Drilling: MWD / GR
Open Hole: None
Formation Markers:
Formation Tops MD TVDss Comments
Base Permafrost 1841' 1800' Est. pore pressure 785 psi (8.4 ppg EMW)
SV5/T8 3575' 3530' Est. pore pressure 1535 psi (8.4 ppg EMW)
SV3/T5 3945' 3900' Est. pore pressure 1705 psi (8.4 ppg EMW)
SV2 4105' 4060' Est. pore pressure 1745 psi (8.4 ppg EMW)
9-5/8" Surface Csg 4105' 4060' Set immediately above high quality SV2 Sands
TD 4355' 4310' 4" Gravel Pack Screens Liner set at TD just below
high quality SV2 Sands
SV1 / T3 N/A 4485' Not Penetrated
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/I'VD MDFrVD
30" 20" 91.5# H-40 WLD 80' GL 120'/120'
12-1/4" 9-5/8" 40# L-80 BTC-M -4075' GL 4105'/4101'
8-3/4" ** 4" 9.5# L-80 SL-HT -355' 4000'/3996' 4355'/4351'
Tubing 4-1/2" 12.6# L-80 IBTC-M ~-3920' GL 3950'/3946'
** The 4" liner will be blank pipe in the liner lap and 8 gauge gravel pack screens in the o ~en hole section.
Cement Calculations:
The following cement calculation are based upon a two stage job using a stage tool. If a port collar is run
rather than a stage tool, circulating cement to surface will be attempted using a single stage job. Cement
volumes will be as follows: Lead - as noted for both 1st and 2nd stage. Tail - as noted below for Ist stage.
WB-07 Permit to Drill
CONFIDENTIAL
Casing Size 19-5/8" Surface- lS' Stage I
Basis: I Lead: Based on 1455' of open hole from top of tail slurry to stage collar + 50% excess.
I
Lead TOC: At -2050' MD (2046' TVD), planned set depth of stage tool.
Tail: Based on 600',MD / TVD ,open hole volume + 50% excess + 80' shoe track volume.
Tail TOC: At-3505 MD (3501 TVD).
Total Cement Volume: Lead 1122 bbl / 685 f¢ / 155 sks of Dowell ARTICSET Lite 3 at
10.7 ppg and 4.44 cf/sk.
Tail 57 bbl / 320 f¢ / 276 sks of DoWell Premium 'G' at 15.8
ppg and 1.16 cf/sk.
Casino.
Basis:
Size 19-5/8" Surface - 2® Stage
Lead: Based on 2050' of open hole from stage collar to surface + 350% excess + 9-5/8"
casing capacity from surface to stage tool.
Lead TOC: At surface.
Tail: None
Tail TOC: N/A
ITotal Cement Volume:
Lead
Tail
671 bbl / 3768 f¢ / 849 sks of Dowell ARTICSET Lite 3
at 10.7 ppg and 4.44 cf/sk.
None
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams,
and annular preventer will be installed and is capable of handling maximum potential surface
pressures. Based upon calculations below BOP equipment will be tested to 3000 psi
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Interval-
, Maximum anticipated BHP: 1750 psi @ 3990' TVDss - SV2 Sands (water)
· Maximum surface pressure: 1350 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOPtest pressure:
· Planned completion fluid-
3000 psi
8.7 ppg KCI Brine / 6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· west Beach Pad is not designated as an H2S drill site, however Standard
Operating Procedures for H2S precautions should be followed at all times. The
highest level of H2S recently measured on West Beach Pad has been 30 ppm.
WB-07 Permit to Drill
P-, ]NFI ENTI L
DRILLING CLOSE APPROACH:
All wells pass close approach guidelines.
SURFACE HOLE SECTION:
· The surface hole interval on West Beach Pad has been relatively problem free with the
exception of WB-06.
· Large amounts of running pea gravel and coarse sand were seen while drilling the
surface interval on WB-06. However, hole angle was in excess of 60 degrees.
· Water encroachment was seen on WB-06 from the SV1 interval (-4600' TVD) which
diluted mud properties. Mud properties should be monitored closely to eliminate
running sand / gravel and hole cleaning problems.
· Minor tight hole has been encountered in the clay sections below the permafrost.
· Differential sticking could be problematic in this hole section adjacent to the permeable
SV Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss
properties of mud, and string in Barofibre prior to penetrating sand intervals.
PRODUCTION SECTION:
· Hydrocarbons are not expected in this interval.
· Differential sticking will be a problem if loss circulation is occurring or if the drill string is
left stationary for an extended period or time.
· The surface casing will be set immediately above the SV2 target sand interval.
Therefore, results of the FIT test 20' outside the shoe could be substantially lower than
typical surface shoe LOT's. The FIT test is planned to 9.5 ppg, which is -0.5 ppg
above the planned mud weight at TD of the interval (-250' outside the surface shoe
and within the same sand unit).
· Kick tolerance for the 9-5/8" shoe would be an infinite influx (annular volume) assuming
an influx (assumes gas even though hydrocarbons not expected) at section TD of
4,355'. This is a worst case scenario based on an 8.7 ppg pore pressure, a minimum
fracture gradient of 9.5 ppg at the 9-5/8" casing shoe, and 9.0 ppg mud in the hole.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind
and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-
04 for injection. Haul all Class I wastes to Pad 3 for disposal.
WB-07 Permit to Drill
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor has already been set for this well.
1. Weld an FMC landing ring for the FMC ARCO Tabasco Wellhead on the conductor.
2. Remove the well house from offset wells as required. If necessary, level the pad and prepair location
for rig move.
Rig
1.
2.
3.
Operations:
MIRU Nabors 7ES.
Nipple up and function test 21-1/4" diverter system. PU 4" DP as required and stand back in derrick.
MU 12-1/4" drilling assembly and drill surface hole to approximately 4105' MD / 4101' TVD. The
actual surface hole TD will be +/-10' above the SV2 target sands.
4. Run and cement the 9-5/8", 40# surface casing back to surface. A port collar or stage tool will be run
in the casing to allow for secondary cementing if cement is not circulated to surface during primary
cementing operations.
5. ND diverter system and NU casing / tubing head. NU BOPE and test to 3000 psi.
6. MU 8-3/4" drilling assembly and RIH to float collar. Test the 9-5/8" casing to 3000 psi for 30 minutes.
7. Drill out shoe joints and displace well to 9.0 ppg 3% KCI drill-in fluid. Drill new formation to 20' below
9-5/8" shoe and perform Formation Integrity Test to 9.5 ppg. (Because the 9-5/8" surface casing is
being set immediately above the SV2 target sands, a FIT test to 9.5 ppg is planned rather than a LOT.
The SV2 sand is expected to be exposed after drilling 20' of new hole and this section is expected to
TD at the base of this sand interval.)
8. Drill ahead to planned TD at approximately 4355' MD / 4351' TVD. POOH.
9. MU 8-3/4" clean-out assembly with 9-5/8" casing scraper. RIH with bit to TD and scraper -50' into 9-
5/8" shoe. Displace well to 8.7 ppg KCI completion brine. Filter fluid to desired specs and POOH.
10. Run in hole with the 4" Gravel Pack Liner Assembly. Set the liner top gravel pack packer and perform
open hole gravel pack, placing 30 / 40 mesh sand between 8-3/4" open hole and 4" gravel pack
screens. POOH laying down DP and gravel pack tools.
11. Run 4-1/2", 12.6# L-80 IBT-Mod Electric Submersible Pump completion. See attached completion
schematic for details.
12. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way
check and freeze protect the well to -2000'.
13. Install BPV. Secure the well and rig down / move off 7ES.
Estimated Spud Date:
12/15/99
William Isaacson
Operations Drilling Engineer
564-5521
~ R I L... L~,! N G ,,,,SE;FI,VICES
CONFIDENTIAL
Shared Services Drilling
West Beach #7 Wp2 (WBeach-07 Wp2)
Proposal Data for WBeach-07 Wp2
Vertical Origin:Well
Horizontal Origin: Well
Measurement Units: ft
North Reference:True North
Dogleg severity:Degrees per 10Oft
Vertical Section Azimuth: 172.000'
Vertical Section Description: Well
Vertical Section Origin: 0.00 N.0.00 E
Measured Incl. Azlm. Vertical
Depth Depth
0.00 0.0001.436 0.00
300.00 0.0001.436 300.00
800.00 5.000172.000 799.37
1400.00 5.000172.000 1397,08
1900.00 0.0001.436 1896.45
4354.75 0.0001,436 4351.20
} DrillQuest"
Northlngs Eaatlnga VerticalDogleg
Section Rate
0.00N 0.00E 0.00
0.00 N 0.00 E 0.00 0.000
21.59 S 3.03 E 21.80 1.000
73.38 S 10.31 E 74.10 0.000
94.97 S 13.35 E 95.90 1.000
94.97 S 13.35 E 95,90 0.000
600
: Start Dir @ 1.000°/100ft' 300.00ft MD, 300.00ft TVD
Dir: 800.00ft MD, 799.37ft TVD
1200
1800
2400
3000 ....
3600
Dir @ 1.000°/100ft · 1400.00ft MD, 1397.08ft TVD
0
KOP · Start Dir @ 1.000°/100ft' 300.00ft MD, 300.00ft TVD
Dir' 1900.00ft MD, 1896.45ft TVD
Eastings
Scale: linch = 5Oft
End Dir: 800.00ft MD, 799.37ft TVD-
._
'~ -50
0
Z
Start Dir @ 1.000°/100ft- 1400.00ft MD, 1397.08ft TV[
End Dir' 1900.00ft MD, 1896.45ft T
-100
Total Depth · 4354.75ft MD, 4351.20ft
0
9 5/8" Casing
4104.75 MD
4101.20 TVD
4" Liner
4351.20 TVD
TV
0
Reference is True North
Eastings
Scale: linch = 50ft
SV5/T8 - 3571.20 TVD
0 ...... 5 ~/'8:"~,-a¥ih'g' SV3/TS- 3941.20 TVD
O 4104.75 MD
co ..... 410J,~O.T.V.O.
Il SV2 - 4101.20 TVD
'~ 4200 .... 4" Liner
4354.75 MD
· -- 4351.20 TVD
',r--
~ Depth ' 4354.75ft MD, 4351.20ft TVD
--
SVI/T3 - 4526.20 TVD
Section Azimuth: 172.000° (True North)
Scale: linch = 600ft
Vertical Section
Sperry-Sun Drilling Services
Proposal Report for WBeach-07 Wp2
Prudhoe Bay Unit
Measured
Depth
(ft)
Azim.
Sub-Sea
Depth
(ft)
0.00 0.000 0.000 -41.20
100.00 0.000 0.000 58.80
200.00 0.000 0.000 158.80
300,00 0.000 0.000 258.80
400.00 1.000 172.000 358.79
500.00 2.000 172.000 458.76
600.00 3.000 172.000 558.66
700.00 4.000 172.000 658.48
800.00 5.000 172.000 758.17
900.00 5.000 172.000 857.79
1000.00 5.000 172.000 957.40
1100.00 5.000 172.000 1057.02
1200.00 5.000 172.000 1156.64
1300.00 5.000 172.000 1256.26
1400.00 5.000 172.000 1355.88
1500.00 4.000 172.000 1455.57
1600.00 3.000 172.000 1555.39
1700.00 2.000 172.000 1655.29
1800.00 1,000 172,000 1755.25
1900.00 0,000 0,000 1855.25
2000.00 0.000 0.000 1955.25
2100.00 0.000 0.000 2055.25
2200.00 0.000 0.000 2155.25
2300.00 0.000 0.000 2255.25
2400.00 0.000 0.000 2355.25
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
0.00 0.00 N 0.00 E 598296 N 687766.20 E
100.00 0.00 N 0.00 E N 687766.20 E
200.00 0.00 N 0.00 E 59~ 687766.20 E
300.00 0.00 N 0.00 E 687766.20 E
399.99 0.86 S 0.12 E .58 N 687766.34 E
499.96 3.46 S N 687766.77 E
599.86 7.78 S 1.i N 687767.49 E
699.68 13.82 S N 687768.49 E
799.37 21.59 S 5982940.93 N 687769.77 E
898.99 30.22 S 5982932.33 N 687771.20 E
998.60 5.46 E 5982923.74 N 687772.63 E
1098.22 E 5982915.14 N 687774.06 E
1197.84 7.89 E 5982906.54 N 687775.49 E
1297.46 9.10 E 5982897.94 N 687776.92 E
1397.08 73.38 S?? 10.31E 5982889.35 N 687778.35 E
1496.77 81.14 S 11.40 E 5982881.61 N 687779.63 E
1596.59 87.19 S 12.25 E 5982875.58 N 687780.64 E
1696.49 91.51 S 12.86 E 5982871.28 N 687781.35 E
1796.45 94.10 S 13.23 E 5982868.70 N 687781.78 E
1896.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
1996.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
2096.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
2196.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
2296.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
2396.45 94.97 S 13.35 E 5982867.84 N 687781.92 E
Alaska State Plane Zone 4
PBU_West Beach
Dogleg
Rate
(°/100fi)
Vertical
Section
(ft)
Comment
0.000
0.000
0.000
1.000
1.000
1,000
1.000
1,000
0.000
0.000
0.000
0.000
0.000
0,000
1,000
1.000
1,000
1,000
1.000
0.000
0.000
0.000
0.000
0.000
0.00
0.00
0.00
0.00
0.87
3.49
7.85
13.96
21.80
30.52
39.23
47.95
56.67
65.38
74.10
81.94
88.05
92.41
95.03
95.90
95.90
95.90
95.90
95.90
95.90
KOP: Start Dir @
1.000°/100ft: 300.00ft MD,
300.00ft TVD
End Dir: 800.00fl MD,
799.37ff TVD
Start Dir @ 1.000~100fl:
1400.00ff MD, 1397.08ff
TVD
End Dir:1900.00ff MD,
1896.45ffTVD
Continued...
Z
19 October, 1999 - 16:30 - 1 - DrillQuest 1,05.04c
Sperry-Sun Drilling Services
Proposal Report for WBeach-07 Wp2
Prudhoe Bay Unit
Measured
Depth
(ft)
Azim.
Sub-Sea
Depth
(ft)
Alaska State Plane Zone 4
PBU_West Beach
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
2500.00 0.000 0.000 2455.25 2496.45
2600.00 0.000 0.000 2555.25 2596.45
2700.00 0.000 0.000 2655.25 2696.45
2800.00 0.000 0.000 2755.25 2796.45
2900.00 0.000 0.000 2855.25 2896.45
3000.00 0.000 0.000 2955.25 2996.45
3100.00 0.000 0.000 3055.25 3096.45
3200.00 0.000 0.000 3155.25 3196,45
3300.00 0.000 0.000 3255.25 3296.45
3400.00 0.000 0.000 3355.25 3396.45
3500.00 0.000 0.000 3455.25 3496.45
3574.75 0.000 0.000 3530.00 3571.20
3600.00 0.000 0.000 3555.25 3596.45
3700.00 0.000 0.000 3655.25 3696.45
3800.00 0.000 0.000 3755.25 3796.45
3900.00 0.000 0.000 3855.25 3896.45
3944.75 0.000 0.000 3900.00 3941.20
4000.00 0.000 0.000 3955.25 3996.45
4100.00 0.000 0.000 4055.25 4096.45
4104.75 0.000 0.000 4060.00 4101.20
4200.00 0.000 0.000 4155.25 4196.45
4300.00 0.000 0.000 4255.25 4296.45
4354.75 0.000 0.000 4310.00 4351.20
Dogleg
Rate
(°/100ft)
Vertical
Section
(ft)
Comment
94.97 S 13.35 E N
94.97 S 13.35 E 598; N
94.97 S 13.35 E
94.97 S 13.35 E
94.97 S 13.35 E
94.97 S 13.35 E 867.84 N
94.97 S ~7.84 N
94.97 S '.84 N
94.97 S i2867.84 N
94.97 S 5982867.84 N
94.97 S
94.97 S
94.97 S
94.97 S
94.97 S
94.97 S
94.97 S
94.97 S
5982867.84 N
5982867.84 N
E 5982867.84 N
E 5982867.84 N
13.35 E 5982867.84 N
13.35 E 5982867.84 N
13.35 E 5982867.84 N
13.35 E 5982867.84 N
13.35 E 5982867.84 N
13.35 E 5982867.84 N
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
687781.92 E
13.35 E 5982867.84 N 687781.92 E
13.35 E 5982867.84 N 687781.92 E
13.35 E 5982867.84 N 687781.92 E
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
95.90
95.90
95.90
95.9O
95.9O
95.90
95.9O
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
95.90
SV5/T8
SV3/T5
9 5/8" Casing
SV2
Total Deoth: 4354.75ft MD,
4351.20ft TVD
4' Liner
Continued...
DrillQuest 1.05.04c
190ctobe~ 1999 - 16:30 - 2 -
Tree: Horizontal FMC 4-1/16" 5M L-80
Wellhead: FMC ARCO Tabasco 11' x 5M psi
UUINII-IUi, i I tL
WB-07 Proposed Completion
Cellar Box Bev = 11.2'
Rig 7ES RKB = 41,2'
20", 91.5#, H-40 ~
G. 4-1/2" 5M psi FMC Eccentrick Tubing Hanger with 'BIW' penetrators for ESP cable and
downhole gauge conductor wire. 4-1/2" L~80 BTC-Mod tubing pup below hanger.
#1 power cable with tech
wire in armor wrap
F. 4-1/2" 12.6# L-80, IBTC-Mod Tbg to surface with Nova Cable Protector Clamps run on
the coupling of each joint to surface.
Cable splice from motor lead
to #1 power cable, adjacent to
10' pup above pump.
E. 1 joint of 4-1/2" 'L-80 BTC-Mod tubing with annulus sensing Baker 'Sentry' gauge clamped to
tubing OD.
D. 10' x 4-1/2" L-80 BTC-Mod pup joint.
C. Centrilift 'HC 12000' Tandem Pump (70 stages, 2 @ 35) with crossover to 4-1/2" BTC-Mod.
725 Series 'CEE-5KV'
Motor Lead Extension Cable
B. Centrilift Model 'HST3' Seal Section.
A. Centrilift 'HMI' 725 Series 650 hp Motor (4160v / 94 amp). Bottom of motor set +/-50' above
liner top.
9-5/8", 40 #, L-80, BTC-Mod
4", 9.5 #, L-80, SL-HT ~
Gravel Pack A.~sRmbly with Packer set at: [ ~4,000' I
- 9-5/8" 40#/ft 'SC-I' Gravel Pack Packer
- Gravel Pack Extension Sleeve
- Lower Extension with crossover to 4" 9.5# SL-HT
- 4" 9.5# SL-HT Blank Pipe as Required
- 4" 9.5# SL-HT 8 gauge Gravel Pack Screen as Required (with centralizers)
- 4" Gravel Pack Bull Plug
Total Depth l 4,351'4'355'TvDMD J
Date
_ 1_0/22/_99
Rev By
Comments
._ P_roposed Completion
West Beach
WELL: WB-07
APl NO: 50-029-?????
Shared Services Drilling
Alaska
hared
·
ervlces
riiling
CDNFIDENTIA
WELL NAME
WB-07
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in I
the "APPROVAL TO PROCEED"-section at the bottom of this cover sheet.
I
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
F~I Permit Documentation Prepared:
ODE: l._l~ ~. ~...----- Date: I 0 -'t~--~
D Permit Application Reviewed:
SDE/ES: ~--'~'-'>--~,~, :~ Date: ,-/~',t ~,,
Permit Application Submitted: .
TA: ~1~~ ~ Date:~0/:ZTh?
PRE-RIG WORK
Pre-Rig Memo Reviewed:
SDE~S: Date:~
Pre-Rig Memo Sent to Slope:
ODE: Date:
Pre-Rig Sundry Documentation Prepared:
ODE: Date:
Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:~
Pre-Rig Sundry Application Submitted:
TA: Date:~
SUNDRY NOTICE
D Sundry Documentation Prepared:
ODE: Date:
D Sundry Application Reviewed:
s DE/ES: Date :~
D Sundry Application Submitted:
TA: Date :~
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK~ USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
Reason for Sundry (Check all that apply)
Abandon
Alter Casing
Suspend
Repair Well
Plugging
Pull Tubing
Variance
Other(Explain):
Change Approved Program
Operation Shutdown
Re-enter Suspended Well
Time Extension
Perforate
Stimulate
APPROVAL TO PROCEED
oCT 2 ~, 1999
Alaska Oil & Gas Cons./;0mmt~iar.
I
H 156553
YEN~R ALASKAST14 O0
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
091699 CK091699C 100. O0 100. O0
HANDL NO INST: s/h Te~'~'i Hubble x4628
--
HE A~ACHED CHECK IS IN PAYME~ FOR ~MS DE.RICED ABOVE. ill]l!ll ~ 1 OO. OO Z OO. OO
· BP EXPLORATION (ALASKA),:INiC,
P.O,'.BOX 196612
ANCHORAGE; ALASKA 99519-6612
FIRST NATIONAL, BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANI(
CLEVELANC, OHIO
56-389
412
No.. H -.-t:56553:
CONSOLI'DAi:ED COMMERCIAL ACCOUNT
00156553
PAY
To Th e
ORDER
o~
ONE HUNDRED & 00/100~~~~~~~~~~ US DOLLAR
ALASKA STATE DEPT OF REVENUE
3001PORCUPINE:-:DR
ANCHORAQE
AK 99501-3120
DATE
09/20/99 I
NOT VALID AFTER 120 DAYS
AMOUNT
$100-00I
WELL PERMIT CHECKLIST COMPANY,_,~./~.~_.(~_ ...... WELLNAME~Z~ ~/{.,J~_.?__~.~'PROGRAM:exp___dev ...... redrll ....... serv ~ wellboreseg ann. disposal para req
2. '_. ease number appropriale ................... ~~-- ~2~~'~'
3. Unique well name and number ..................
5. Well located proper distance from drilling unit boundarY.. ~ Y N
6. Well located proper distance from other wellsCf,~,. ...... ,,c/,,~ Y N
7. Sufficient acreage available in drillin~.nit.~ ......... ,4,//4 y N
~ 8. If deviated, is wellbore plat include .d~¢?' ............. (~N
9. Operator only affected pady ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ..........
~,ATE 12. Permit can be issued without admimstrabve approv~,~. . . . ~,~
/~,,~'~ 13. Can permit be approved before 15-day wait ...........
ENGINEERING 14. Conductor string provided ................... ~ N
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg .....
18. CMT will cover all known productive horizons .......
19. Casing designs adequate for C, T, B & permafrost ....... (Y') N
20. Adequate tankage or reserve pit .......... k.~. t.~:~,~.%t.~,,, (~) N
21. If a re-drill, has a 10-403 for abandonment been approved~' . . I',M~ -¥--N
GEOLOGY'
DATE
22. Adequate wellbore separation proposed ............ ',,~%
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to "~(_"'~%jt._'-~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
30: Permit--~l~-"b~i~-~l w/5"i~-ydr-Ogen sulfide measures .....
31. Data presented on potential overpressure zones .......
32. Seismic analysis of shallow gas zones .............
33. Seabed condition survey (if off-shore) .............
34. Contact name/phone for weekly progress reports [exploratory
ANNu£Ai~,'DISPOSAL 35. With pr~)~r cei-n~r~tlng rec0~-d~i'this plan ......... ~ ~ ,
....... (A) will contain waste in ~~ng Z~. Y N
APPR DATE (B) will not contami~reshwater; or cause drilling waste. ~ Y N
to sudace; / _ ~
(C) will not i~ir mechanical integrity of the well used for disposal;
(D) will no~amage producing formation or impair recove~ from a Y N
poo~nd ~~-
(E) will'not ci~umvent 20 ~C 25.252 or 20 ~C 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION:
R~i~~.~ BEW ~ WM~ DWJ~~
S - JDH ~,,., _'~- RNC ~ -"-
TE~ ~,~j,%..~c~..~ CO ~'~-k¢.:' ........
Comments/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 09~27~99)
Well History File
APPENDIX
Information of detailed nature that is not
padiculady germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.'
..
No 'special'effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Mon Jun 05 16:18:44 2000
Reel Header
Service name ............. LISTPE
Date ..................... 00/06/05
Origin ................... STS
Reel Name ................ UNK/qOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 00/06/05
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
RECEIVED
JUN 2 1 2000
Alaska Oil & Gas Cons. Commission
Anchorage
Sc'ient.i. fic Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
MWD RUN 1
AK-MM-90222
RANDY KRELL
TIM BURNS
OPEN HOLE
BIT SIZE (IN)
12.250
8.750
WB-07
500292294900
ARCO Alaska,
Sperry Sun
05-JUN-00
Inc.
MWD RUN 2
AK-MM-90222
RANDY KRELL
TIM BURNS
25
12N
14E
69
3429
.00
39.70
28.50
CASING
SIZE (IN)
9.625
DRILLERS
DEPTH (FT)
4096.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 AND 2 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR)
UTILIZING GEIGER MUELLER TUBE DETECTORS.
3. DIGITAL AND LOG MWD DATA ARE DEPTH-CORRECTED TO THE
PDC LOG OF
1/19/00. ALL MWD LOG HEADER DATA RETAINS THE
ORIGINAL DRILLER'S
DEPTH REFERENCES.
4. MWD RUNS 1 AND 2 REPRESENT WELL WB-07 WITH API #
50-029-22949-00
THIS WELL REACHED A TOTAL DEPTH OF 4370'MD,
4326'SSTVD.
SGRC = SMOOTHED GAMMA RAY
SROP = SMOOTHED RATE OF PENETRATION
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 64 . 5 4359.0
ROP 108 . 0 4369.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
4 5
187
221
229
269
274
290
341
388
538
614
622
631
642
665
668
671
677
681
690
GR
65.5
188 0
222 5
230 5
270 0
275 0
290 5
342 5
391 0
541 0
618.0
625.5
635.0
645.0
668.0
671.5
676.0
680.0
683.5
689.0
EQUIVALENT UNSHIFTED DEPTH
696.5
707.5
710.5
713 0
716 0
723 0
737 5
751 0
752 5
760 5
762 0
769 5
771 5
839 5
843 5
848 5
861 5
869 0
880 5
883 5
918 5
925 0
930 0
945 0
957 5
967 0
972 5
981.5
1016 0
1022 5
1055 0
1103 0
1111 5
1122 5
1154 5
1161 5
1166 0
1170 0
1173 0
1176 0
1208 0
1222 5
1235 5
1244 5
1269 5
1271 5
1273 5
1288 0
1304 0
1305 5
1325 5
1338 0
1347 5
1369 5
1379 0
1383 0
1404 5
1432 0
1445 0
1455 5
1459 5
1466 0
1470 5
1472 0
1477.0
1481.5
1483.5
1486.0
696.0
708.0
710.5
714.0
716.5
723.0
737.5
751.5
755.0
760.5
763.0
771.0
773.5
840.0
845.5
850.5
863.5
871.0
882.5
885.5
922.0
927.0
932.0
947.5
959.5
968.5
974.0
983.0
1017.5
1024.5
1057.0
1105.0
1113.0
1124.0
1156.0
1163.0
1168.5
1171.5
1175.5
1177.5
1209.0
1224.0
1237.0
1246.5
1271.5
1272.5
1275.0
1289.5
1305.5
1307 5
1327 0
1340 0
1348 0
1370 0
1380 0
1383 5
1404 5
1431 0
1445.5
1457.5
1462.5
1467.0
1471.5
1474.5
1478.0
1483.0
1485.5
1487.0
1488.0
1512.5
1514.0
1522.5
1529.0
1533.5
1537.0
1552.0
1557.0
1577.0
1587.0
1591.0
1595.5
1607.5
1638.0
1640.5
1645.0
1647.5
1649.5
1650.0
1654.5
1659.0
1660.0
1666.0
1677 5
1683 5
1685 0
1697 5
1699 0
1716 0
1721 5
1726 0
1740 0
1742 5
1745 0
1765 5
1767 5
1779 0
1780 5
1782 0
1783 5
1789 5
1797.0
1801.0
1811.0
1821.0
1822 5
1842 0
1863 5
1871 5
1875 0
1889 0
1892.5
1897 0
1903 0
1915 5
1921 0
1924 0
1928 0
1939 5
1940 5
1947 5
1951.5
1965.0
1972.5
1975.0
1985.0
2011.0
1490 0
1514 0
1516 0
1523 5
1531 0
1535 0
1539 0
1553 5
1559 0
1579 0
1587.0
1591 0
1596 5
1610 0
1639 0
1641 0
1646 0
1648 5
1650.0
1651 5
1655 0
1660 0
1661 5
1668 0
1678 5
1684 0
1686.5
1698.0
1699.5
1717.0
1724.5
1730.0
1743.5
1745.5
1748.5
1767.5
1770.0
1781.5
1783.5
1785.0
1786.0
1792.0
1799.5
1804.0
1813.0
1823.0
1825.0
1844.0
1864.5
1871.5
1875.5
1889.5
1894.0
1897.5
1903.5
1918.0
1923.5
1927.5
1930.5
1942.0
1943.0
1950.5
1957.5
1967.5
1974.0
1977.5
1986.5
2013.0
2015 0
2018 0
2023 5
2027 5
2029 0
2032 5
2041 5
2050 5
2057 0
2063 0
2086 0
2094 0
2100 5
2107.5
2115 0
2140 0
2142 5
2152 0
2157 5
2164 5
2166 5
2180 0
2208 5
2210 0
2211 5
2216 0
2223 0
2227 0
2228 5
2229 5
2235 0
2253 0
2256 0
2263 5
2274 0
2278 5
2282 0
2283 5
2290.5
2294.0
2300.5
2312.5
2315.5
2324.5
2326.5
2345.5
2360.5
2371.0
2377.0
2382 5
2387 0
2391 5
2412 0
2414 0
2419 5
2422 5
2432 0
2434 0
2441 5
2445 5
2448 0
2449 0
2455 5
2457 5
2477 0
2483 5
2486 0
2489 0
2017.5
2020.5
2027.0
2030.5
2032.0
2036.5
2044.0
2052.5
2059.0
2065.0
2087.0
2095.0
2100.0
2108.0
2115.5
2140.5
2143.0
2152.5
2158.5
2164.5
2167.0
2181.0
2208.0
2210.0
2211.5
2216.5
2221.5
2226.5
2228.0
2229.5
2234.0
2252.5
2255.0
2263.5
2273.5
2278.0
2281.0
2283.0
2292.0
2294.0
2299.5
2312.0
2314.5
2325.5
2327.0
2345.0
2360.0
2369.5
2376.0
2382.5
2386.0
2390.5
2410.5
2412.5
2418.5
2421.5
2432.5
2434.0
2441.0
2444.5
2446.5
2447.5
2455.0
2457.0
2476.5
2484.0
2486.0
2488.0
2506.0
2517.0
2522.5
2541.5
2547.5
2552.5
2557.5
2560.5
2575.5
2585.5
2587.5
2591.5
2593.5
2597.0
2603.5
2608.0
2611.0
2618.0
2619.5
2622.5
2630.5
2632.0
2639.0
2648.0
2661.0
2669.5
2671.0
2676.0
2679.0
2682.0
2687.5
2697.0
2698.5
2700.5
2703.0
2705.0
2707.0
2717.0
2719.5
2721.0
2726.0
2728.5
2737.5
2747.5
2767.5
2805.5
2810.0
2818 0
2839 0
2843 5
2855 0
2860 5
2876 0
2881 5
2886 5
2893 5
2898 5
2905 5
2910 5
2918 0
2921 0
2926 5
2932 0
2941 0
2945 5
2996 0
2997 5
3011 0
2505.5
2515.5
2524.0
2540.5
2547.0
2551.5
2556.5
2559.5
2574.5
2584.5
2586.5
2590.0
2591.5
2595.5
2602.0
2607.5
2611.0
2616.5
2619.0
2622.5
2629.0
2631.0
2637.0
2646.0
2658.5
2667.5
2669.5
2675 0
2677 0
2680 5
2686 5
2695 5
2698 0
2700 0
2702.0
2705.5
2707.5
2716.5
2718.5
2720.5
2725 5
2728 5
2737 5
2746 5
2767 0
2805 0
2809 0
2817 0
2838 5
2843 0
2855 0
2859 5
2876 5
2882 5
2887 5
2895 0
2899 5
2906 5
2912 0
2919 0
2922 5
2927 0
2932 0
2941 5
2947.0
2996.5
2997.5
3012.0
3021 0
3025 0
3037 5
3068 0
3076 0
3080 5
3097 5
3109 5
3123 5
3127 0
3131 0
3140 0
3142 0
3156 0
3166 5
3171.0
3179.5
3187.5
3192.5
3195.5
3212.5
3238.5
3240.0
3244 0
3248 5
3253 5
3258 0
3264 5
3271 5
3280 5
3285 5
3326.0
3329.5
3333.5
3337.0
3351.0
3361.5
3364.5
3366.0
3369.5
3371.0
3377.5
3380.5
3390.5
3394.5
3413.5
3456.0
3478.5
3488.5
3498.0
3511.5
3525.5
3533.5
3541.5
3572.0
3573.5
3583 0
3595 5
3599 5
3605 0
360,8 5
3614 5
3618 5
3640 0
3641 5
3676 0
3686 0
3693.0
3021.5
3026.5
3038.5
3069.5
3077.5
3081.5
3098.5
3111.0
3124.0
3127.0
3131.5
3140.5
3142.0
3157.5
3169.5
3174.5
3182.5
3189.5
3194.5
3198.0
3215.5
3241 5
3244 5
3250 5
3255 5
3259 0
3262 5
3269 5
3280 0
3288.0
3294.5
3332.0
3335.0
3338.0
3341.5
3355.0
3365.0
3368.5
3370.0
3373.5
3375.5
3382.0
3385.5
3393.5
3397.5
3415.5
3456.5
3478.5
3489.0
3496.5
510.0
525.5
533.5
541.5
571.5
573.5
582.5
594 5
599 0
604 5
608 5
614 5
619 0
640 0
642 0
676.0
686.5
694.5
3702.5
3728.0
3735.0
3740.5
3750.5
3798.5
3818.0
3830.0
3835.5
3874.5
3889.0
3896.5
3930.5
3937.0
3986.0
4014.5
4025.5
4040.5
4046.0
4047.5
4072.5
4102.0
4153.0
4163.0
4175.0
4193.5
4212.0
4252.0
4255.0
4258.0
4260.5
4266.5
4303.0
4309.5
4314.0
4369.0
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
REMARKS:
3704.0
3729.5
3738.0
3744.0
3755.0
3802.5
3821.0
3832.5
3838.0
3876.5
3885.5
3894.5
3927.0
3932.5
3985.0
4012.0
4022.5
4036.5
4042.5
4044.5
4072.0
4102.5
4153.0
4163.0
4175.5
4194.0
4212.0
4252.5
4254.5
4258.0
4260.0
4267.0
4303.5
4311.5
4315.0
4370.0
BIT RUN NO MERGE TOP MERGE BASE
1 65.5 4096.0
2 4096.0 4370.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Service Unit
Min Max Mean Nsam
First
Reading
Last
Reading
DEPT FT 64.5 4369
ROP MWD FT/H 0 532.37
GR MWD API 17.75 128.9
2216.75 8610
137.023 8523
55.6536 8590
64.5
108
64.5
4369
4369
4359
First Readin9 For Entire File .......... 64.5
Last Readin9 For Entire File ........... 4369
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and lo9 header data for each bit run in separate files.
· BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 65.5 4052.0
ROP 109.0 4096.0
$
LOG HEADER DATA
DATE LOGGED: 08-JAN-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT) : 4096.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: .3
MAXIMUM ANGLE: 6.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY P1389CGV8
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 12.250
DRILLER'S CASING DEPTH (FT) : 4096.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (CB) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT M~X CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Water Based
9.40
108.0
9.1
1400
7.6
.000
.000
.000
.000
· Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
62.0
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 65.5 4096 2080.75 8062
ROP MWD010 FT/H 0 532.37 135.512 7975
GR MWD010 API 17.75 128.9 55.397 7974
First
Reading
65.5
109
65.5
Last
Reading
4096
4096
4052
First Reading For Entire File .......... 65.5
Last Reading For Entire File ........... 4096
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 4052.5
ROP 4096.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
4360.0
4370.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
12 -JAN- 00
Insite
65.31
Memory
4370.0
.8
.8
TOOL NUMBER
PB01409HGV6
8.750
Water Based
9.10
56.0
8.9
13200
4.6
.000
.000
.000
.000
.0
65.0
.0
.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 4052.5 4370 4211.25 636
ROP MWD020 FT/H 11.54 237.98 154.054 548
GR MWD020 API 33.41 92.18 58.6512 616
First Last
Reading Reading
4052.5 4370
4096.5 4370
4052.5 4360
First Reading For Entire File .......... 4052.5
Last Reading For Entire File ........... 4370
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/06/05
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 00/06/05
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 00/06/05
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File