Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout199-118MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, December 13, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC B-32A PRUDHOE BAY UNIT B-32A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 12/13/2024 B-32A 50-029-22165-01-00 199-118-0 W SPT 8429 1991180 2107 1197 1198 1199 1200 127 171 132 127 4YRTST P Kam StJohn 10/18/2024 4 Year AOGCC MIT-IA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT B-32A Inspection Date: Tubing OA Packer Depth 283 2359 2325 2318IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS241018125054 BBL Pumped:3.3 BBL Returned:3.5 Friday, December 13, 2024 Page 1 of 1 9 9 9 9 9 9 999 99 99 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2024.12.13 12:48:17 -09'00' MEMORANDUM TO: Jim Regg 'QIc��i�Zc�o P.I. --". —w. 6flI FROM: Adam Earl Petroleum Inspector Well Name PRUDHOE BAY UNIT B -32A Insp Num: mitAGE201018093848 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, October 20, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC B -32A PRUDHOE BAY UNIT B -32A API Well Number 50-029-22165-01-00 Permit Number: 199-118-0 Packer Depth Well B -32A Type Inj W, ITVD -- 8429 PTS 1991180 Type Test l spr ITe tspsi 2107 BBL Pumped: 2,5 ,BBL Returned: 25 Interval 4YRTST P/F P Notes: MIT IA Sre: Inspector Reviewed By: P.I. Supry —TN --- Comm Inspector Name: Adam Earl Inspection Date: 10/13/2020 ' Pretest Initial 15 Min 30 Min 45 Min 60 Min ubingl 1280 -I 1280 - 1280 - 1280 IA 1 445 2281 - 2259 -i 2256 - OA 115 256 I--155 - 129 Tuesday, October 20, 2020 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday,November 04,2016 TO: Jim Regg —� P.I.Supervisor k it 1 l 110(lt° SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. B-32A FROM: Johnnie Hill PRUDHOE BAY UNIT B-32A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry ..161.--- NON-CONFIDENTIAL NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT B-32A API Well Number 50-029-22165-01-00 Inspector Name: Johnnie Hill Permit Number: 199-118-0 Inspection Date: 10/18/2016 Insp Num: mitJWH161018161206 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 13-32A . JType Inj W,-TVD 8429 - Tubing I 1212 1193 - 1208 - 1196 . ! PTD J. 1991180 - Type Test SPT Test psi2107 • IA I 272 2290 - 2275. 2271 - Interval 4YRTST P/F P ✓ OA 142 148 - 147 144 . i Notes: 3.37 bbls of diesel used , SCANNED ,. j°7. �1P 2 r� � 1 Friday,November 04,2016 Page 1 of 1 Pages NOT Scanned in this Well History File · · XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. i ~ ~" i l~ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: Other- Pages: DIGITAL DATA /~ Diskettes, No. ~ [] Other, No/Type OVERSIZED .n Logs-of vadous kinds . n Other COMMENTS: Scanned by: Dianna Vincent Nathan Lowell -- [] TO RE-SCAN Notes: - Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: /si STATE OF ALASKA • ALASKA PAND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other is BRIGHTWATER Performed: Alter Casing ❑ Pull Tubing Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development p Exploratory ❑ — 199 -1180 3. Address: P.O. Box 196612 Stratigraphic Service 151 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 22165 -01 -00 8. Property Designation (Lease Number) : r 9. Well Name and Number: ADLO- 028313 y PBU B -32A 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 11344 feet Plugs (measured) 11200 feet true vertical 9094.34 feet Junk (measured) None feet Effective Depth measured 11285 feet Packer (measured) 9946 10101 feet true vertical 9045.23 feet (true vertical) 8429 8544 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 34 - 144 34 - 144 Surface 2670' 13 -3/8" 68# L -80 32 - 2702 32 - 2698 4930 2270 Production 10282' 9 -5/8" 47# NT80S 30 - 10312 30 - 8698 6870 4760 Liner 292' 7" 26# NT80S 10042 - 10334 AUG 500 - 8714 7240 5410 Liner e G 2 2. LOi Liners Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ Tubing: (size, grade, measured and true vertical depth) 7" 26# L -80 28 - 10042 28 - 8500 Packers and SSSV (type, measured and true vertical depth) 7" Baker SABL -3 Packer V \ 9946 '' 8429 2 -7/8" BKR FHL LTP N 101 8544 12. Stimulation or cement squeeze summary:, `� 6 �v� Intervals treated (measured): lb Treatment descriptions including volumes used and final pressure: Go OVA w ..till!+ ti d ". 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 7658 19 Subsequent to operation: 7860 25 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development ❑ Service 0 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: . Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG GINJ ❑ SUSP❑ SPLUG p 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na oe Lastu - t Title Petrotechnical Data Technologist Signet e lk I, /� Phone 564 -4091 Date 8/16/2011 _r Form 10 -404 Revised 10/20101'-18DMS AUG 17 20 2 231 ZfiO Submit Original Only B -32A 199 -118 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base B -32A 12/23/99 PER 11,210. 11,236. 8,976.2 9,000.31 B -32A 12/23/99 PER 11,246. 11,274. 9,009.64 9,035.41 B -32A 5/10/01 BPS 11,200. 11,274. 8,967.07 9,035.41 B -32A 5/11/01 APF 11,044. 11,069. 8,850.89 8,865.32 B -32A 5/11/01 APF 11,069. 11,094. 8,865.32 8,881.64 B -32A 5/11/01 APF 11,126. 11,151. 8,905.04 8,924.81 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET • FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 0 • • B -32A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 7/5/2011 TIO = 50 /1060/ 140 Rig up for Brightwater and PT lines. 7/6/2011' ** *WSR continued from 7- 6 -11 * ** TIO = 50 /1060/ 140 Temp =Hot (Brightwater Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 7500 bwpd. Pumped 562 gal. EC9360A (Surfactant) Average of 37.9 gph for 15 hrs. 'Pumped a total of 562 gal. since start of project. 'Pumped 2339 gal. EC9378A ( Polymer) Average of 194.9 gph for 12 hrs. Pumped a total of 2339 gal. since start of project ** Safety drill on emergency evacuation of Baker pad ** 7/7/2011; ** *WSR continued from 7- 6 -11 * ** TIO = 39 /1040/ 140 Temp =Hot (Brightwater Reservoir Sweep Mod) 'Pump brightwater chemicals down TBG while on water injection @ - 7500 bwpd. !Pumped 1086 gal. EC9360A (Surfactant) Average of 45.25 gph for 24 hrs. 'Pumped a total of 1648 gal. since start of project. i Pumped 5173 gal. EC9378A ( Polymer) Average of 215.5 gph for 24 hrs. Pumped a total of 7512 gal. since start of project 3 ! 7/8/20111 ** *WSR continued from 7- 7 -11 * ** TIO = 49/1040/ 120 Temp =Hot (Brightwater i Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 7500 bwpd. Pumped 999 gal. EC9360A (Surfactant) Average of 41.6 gph for 24 hrs. Pumped l a total of 2647 gal. since start of project. Pumped 5071 gal. EC9378A ( Polymer) Average of 211 gph for 24 ;hrs. Pumped a total of 12583 gal. since start of project 7/9/2011; ** *WSR continued from 7- 8 -11 * ** TIO = 28/1020/ 120 Temp =Hot (Brightwater ;Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 7500 bwpd. Pumped 971 gal. EC9360A (Surfactant) Average of 40.5 gph for 24 hrs. Pumped a total of 3618 gal. since start of project. Pumped 4867 gal. EC9378A ( Polymer) Average of 202 gph for 24 hrs. Pumped a total of 17450 gal. since start of project 7/10/2011 ' ** *WSR continued from 7- 9 -11 * ** TIO = 48/1020/ 120 Temp =Hot (Brightwater Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 7600 bwpd. `Pumped 996 gal. EC9360A (Surfactant) Average of 41.5 gph for 24 hrs. Pumped a total of 4614 gal. since start of project. Pumped 4862 gal. EC9378A ( Polymer) Average of 202.5 gph for 24 hrs. Pumped a total of 22312 gal. since start of project '-'--�°m/ --'--------' ��r�-----' ''------------- --- ' �11/2O11 .,8F{oontnuedfnonl7-10-11 T|C)=37/1060/ 120 Temp=Hot (Brightwater Reservoir Sweep Mod) ? ' Pump brightwater chemicals down TBG while on water injection @ -760 bwpd. 'Pumped 967 Average 42 (Surfactant) total of 5581 gal. since start of project. !Pumped 4586 gal. ECS378A( Polymer ) Average of 204.2 gph for 24 :hrs. Pumped a total of 26908 gal. since start of project °*°Ghu�Oown22'15duetoFG3goingdownand|oominQvva�eri injection 22:15 �` 7/12/2011 °�VV8F(oonUnuad�on�7-11-11�* T|�]=12/1U2O/1OO Temp=Hot (Brightwater �RooanoirGvvmapK8od) ,Job on standby waiting for water injection to com e back on.. Pump brightwater chemicals down TBG while on water injection @ -76OObvvod. !Pumped O gal. EC93OOA(Su Average of 0 gph for 0 hrs. Pumped a tota :of 5581 gal. since start cfproject. 'Pumped O gal. EC9378A( Polymer ) Average of 0 gph for 0 hrs. 'Pumped o total of2OS08 gal. since start ofproject | | 7/13/2011 T/KO=50/380/100 Temp.= G| (Displace and F/PTbgj Displaced tung with 293 ibbls of 150* F 1% KCL followed by 83 bbls of 60/40 meth to freeze protect. Final |VVHP=U/32O/1OO� , K�V.��C}A-open. SV,WV-closed � | / ^-------- - ------------------ -----'----'------------------------ ----- 7/13/2U11|°°*W@R continued from 7-12-11== I Standby for Water Injection to come bachon. |----- ------ ------------------'----- -------] 7'14201/i .^v/uomeuxuv/'//`// vvun Standby for water injection to come back on. . - 7/15/2O11;°°ConUnued from 7/l4/i1VV8R° � | Stanby for water injection on well to resume �-'--' ��'---------- ---- ' --------- --- ------- | 7/1O/2011 Continued from 7/15/11 WSR** Standby for water injection to resume 7/17/2011!**Continued from 07/16/11 WSR** ' for water injection injection to resume. ** Safety Drill - Generater Fi i � | | | i 7/18/2O11 07/17/11 °°�onUnuad�on�VVSR° } 8�endbvYorvvoterin�aoUontorenunna. | i . ��_-__-_' ��__ �1R/2D11 ConUnuodfnon�O7/ �11VV8R Standby for water injection to resume. | ! • • 7/20/2011 ' ** *WSR continued from 7- 19 -11 * ** TIO = 0/280/ 100 Temp =Hot (Brightwater !Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ -- 7500 bwpd. "Pumped 798 gal. EC9360A (Surfactant) Average of 47 gph for 17 hrs. Pumped a total of 6379 gal. since start of project. 'Pumped 2726 gal. EC9378A ( Polymer) Average of 160 gph for 17 hrs. Pumped a 'total of 29634 gal. since start of project TIO= 180/980/130 ** Continued On 07/21/11 WSR ** 7/21/2011' ** *WSR continued from 7 -20 -11 * ** TIO = 180/980/130 Temp =Hot (Brightwater ;Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ — 7500 bwpd. Pumped 681 gal. EC9360A (Surfactant) Average of 40. gph for 17hrs. Pumped a total of 7060 gal. since start of project. Pumped 3338 gal. EC9378A ( Polymer ) Average of 196 gph for 17 hrs. Pumped a total of 32972 gal. since start of project ** Safety Drill - -Bear on location * *Lost water injection, standby for water injection to ;resume. TIO= 10/1000/130 ** Continued On 7 -22 -11 WSR ** j. 7/22/2011 i ** *WSR continued from 7- 21 -11 * ** TIO = 10/1000/130 Temp =Hot (Brightwater Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ — 7500 bwpd. • Pumped 530 gal. EC9360A (Surfactant) Average of 44 gph for 12 hrs. Pumped a 'total of 7590 gal. since start of project. Pumped 1863 gal. EC9378A ( Polymer) Average of 155 gph for 12 hrs. Pumped a !total of 34835 gal. since start of project ** Continued On 7 -23 -11 WSR ** 7/23/2011__.... . _......... ** *WSR continued from 7- 22 -11 * ** TIO = 20/660/120 Temp =Hot (Brightwater `Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ — 7500 bwpd. Pumped 157 gal. EC9360A (Surfactant) Average of 45 gph for 3hrs. Pumped a total of 7747 gal. since start of project. Pumped 472 gal. EC9378A ( Polymer) Average of 144 gph for 3 hrs. Pumped a total of 35307 gal. since start of project !Valve positions upon departure: SV= closed, WV, SSV, MV, IA, OA =open. Operator !notified. FWHP's 20/500/100 E I E j 8/1/2011T/1/O= Vac/1120/130. Temp= 152 °. WHPs (UIC monitor). On Inj. 1SV =C. WV, SSV & MV =O. IA & OA =OTG. NOVP. • 8/3/2011 TIO=vac/980/130. Temp =150 °. Bleed IAP to 500 psi. (UIC). IA FL near surface. Bled IAP to 500 psi <10 mins gas &fluid (mostly gas). SI bleed monitor for 30 min. TBG pressure increased 330 psi, IAP increased 90 psi, PCC increased injection pressure during monitor. PCC will try and keep injection rate stable. Job complete. Final WHPs=330/590/130 SV =C. WV,SSV,MV =O. IA,OA =OTG. NOVP 3 E i � E FLUIDS PUMPED GALS 7747 EC9360A (SURFACTANT) 35307 EC9378A (POLYMER) 43054 TOTAL FLUIDS PUMPED BBLS 293 1% KCL 82 60/40 METH 375 TOTAL TREE = 6" CIW CTUA OR= 13-5/8" AXELSON B-32A M/ WELL > 'TO° @ 104 4 g EQU /RES A SSSV WHEN ON KB. ELEV = 67.48' BE. ELEV = 39.63' KOP = _ 3200' Max Angle = 95 @ 10693' I 2097' 11 7" SSSV OTIS R LANDING NIP Datum MD = 11072' w / 7" X 4 -1/2" INSERT, ID = 3.813" Datum TV D = 8800' SS 1 13 -3/8" CSG, 68 #, L -80, ID = 12.415" I—` 2702' 1- ' Minimum ID = 2.35" @ 10108' BAKER SEAL ASSY 0 ►� ( 9946' H9-5/8" X 7" BKR SABL PKR, ID = 6.0" I I 9999' Hr OTIS R NIP, ID = 5.963" 17" TBG, 26 #, L -80, .0383 bpf, ID = 6.276" I—1 10039' 1TOP OF 7" LNR HGR TIEBACK H 10042' I I 10046' h1 7" DUMMY SEAL ASSY I �-, F14 10101' H 7" X 2 -7/8" BKR FHL LTP, ID = 2.81" I II 10108' , -IBKR SEAL ASSY, ID =2.35" I TOP OF 2 -7/8" LINER, ID = 2.37" H 10115' 10109' I-- 15.75" DEPLOY SLV, ID = 3.00" I 19 -5/8" CSG, 47 #, NT -80 -S, ID = 8.681" I--1 10312' WHIPSTOCK 1-1 10325' MILLOUT WINDOW (B - 32A) 10328' - 10334' [RA TAG' --I 10335' PERFORATION SUMMARY 1114141/ 11200 ' -- I2 -1/8" BKR IBP (05/10/01)1 REF LOG: PDS INDUCTION/GR 12!21!99 ......+:: A+JOJ.O+,'0 .::« . 0 ANGLE AT TOP PERF: 57° @ 11044' « «.'�.�. �. « « �.:.�.: ............ Note: Refer to Production DB for historical perf data ,.. +,.,..... ......•...... .)( %% SIZE SPF INTERVAL Opn /Sqz DATE +,t, +, + +, +;,;;, +, +« / 1 PBTD "1 11285' I 2" 6 11044 -11094 0 05/11/01 ' +'+ " "'+" 2" 6 11126 -11151 0 05/11/01 «0«+««0«+: + .0', 2" 4 11210 -11236 C 05/10/01 . « v 2" 4 11246 -11274 C 05/10/01 , « « « ' , + «;« , , ............ ( 2 -7/8" LNR, 6.16 #, L -80, .00579 bpf, ID = 2.37" H 11344' I 17" LNR, 26 #, NT -80 -S, .0383 bpf, ID = 6.276" I—) 11000' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/06/91 ORIGINAL COMPLETION 12/14/07 BSEIPJC SSSV CORRECTION WELL: B -32A 12/23/99 CTD SIDETRACK 01/09/08 DR/SV TREE C/O (12/12/07) PERMIT No: 99 -1180 01/31/01 SIS -SLT CONVERTED TO CANVAS 02/15/11 MB /JMD ADDED SSSV SAFETY NOTE API No: 50- 029 - 22165 -01 03/08/01 SIS -LG FINAL 2142' FNL & 1609' FEL, Sec. 31, T11N, R14E 07/27/01 CH/KAK CORRECTIONS BP Exploration (Alaska) BP Exploration (Alaska) Inc. ~ ~ °"°'°" ~" Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 11, 2009 • DEC 1 6 2Q09 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Pad B Dear Mr. Maunder, ~~s~~ ail ~ G~~ Cons. Comrnissi~n An~l~~r~ge 19g ala-A Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad B that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date: 12/11/09 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 6-Ot 1700080 50029200590000 Sealed Conductor NA NA NA NA NA B-02 1961110 50029200660100 Sealed Conductor NA NA NA NA NA B-03A 1870480 50029203060100 NA 0.5 NA 3.40 8/20/2009 B-04 1700320 50029200720000 Sealed Conductor NA NA NA NA NA B-058 2010680 50029202760200 NA 1.8 NA 13.60 8/22/2009 B-O6 1770740 50029202790000 NA 1 NA 5.10 8/20/2009 B-07 1780020 50029202850000 NA 1 NA 5.10 8/20/2009 B-OS 1780410 50029203140000 NA 1 NA 6.80 8/20/2009 B-09 1780490 50029203160000 NA 0.5 NA 3.40 8/20/2009 B-10A 2082050 50029203210100 Cellar liner welded to casi NA NA NA NA NA B-11 1780690 50029203310000 NA 0.5 NA 3.40 8/20/2009 B-12 1970090 50029203320100 NA 0.6 NA 3.40 8/22/2009 B-13 1990570 50029203410100 NA 0.4 NA 1.70 8/20/2009 8-14 2090590 50029203490000 NA 0.4 NA 1.70 8/20/2009 B-15 1790190 50029203600000 NA 0.1 NA 1.70 8/20/2009 B-16 1790250 50029203650000 NA 0.8 NA 5.10 8/21/2009 8-77 1790280 50029203680000 NA 0.1 NA 1.70 8/20/2009 B-18 1820020 50029207020000 NA 1.5 NA 15.30 8/21/2009 B-19 2001610 50029207030100 NA 0.1 NA 1.70 8/21/2009 B-20 1821680 50029208420000 NA 0.5 NA 3.40 8/21/2009 B-21 1821760 50029208500000 25 4.5 BBLs 0.1 11/30/2009 1.70 12/3/2009 B-22A 2001570 50029207590100 34 6.5 BBLs 0.2 11/30/2009 1.70 12/3/2009 B-23 1970590 50029207790100 12 2.2 BBLs 3.2 11/30/2009 .10.20 12/4/2009 B-24 1821400 50029208150000 NA 3 NA 22.10 8/21/2009 B-25 1821510 50029208260000 NA 0.25 NA 1.70 8/13/2009 B-26 2000570 50029209760200 NA 0.3 NA 1.70 8/21/2009 B-27 1961010 50029214710100 Sealed Conductor NA NA NA NA NA B-28 1853030 50029215100000 NA 1.1 NA 6.80 8/22/2009 B-29 2002090 50029215230100 NA 0.7 NA 6.80 8/21/2009 B-30 2011050 50029215420100 NA 0.2 NA 1.70 8/21/2009 B-31 1910460 50029221520000 NA 0.3 NA 1.70 8/20/2009 B-32 1991180 50029221650100 NA 0.3 NA 1.70 8/20/2009 B-33 1931450 50029223390100 NA 1.2 NA 8.50 8/21/2009 B-34 1930370 50029223520000 NA 1.2 NA 10.20 8/21/2009 B-35 1931460 50029224060000 NA 0.3 NA 1.70 8/20/2009 B-36 1960650 50029226670000 NA 0.3 NA 1.70 8/21/2009 B-37 2071450 50029233750000 Sealed Conductor NA NA NA NA NA MEMORANDUM To: Jim Regg ~ ~~ ~(~ 1~ ~ Z~~ P.I. Supervisor FROM: Jeff Jones Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, October 29, 2008 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B-32A PRUDHOE BAY UNIT B-32A Src: Inspector NON-CONFIDENTIAL Reviewed By: P.L Suprv ~ 2 Comm Well Name: PRUDHOE BAY UNIT B-32A API Well Number: 50-029-22165-01-00 Inspector Name• Jeff Jones Insp Num: mitJJ081028172345 Permit Number 199-t 18-0 Inspection Date: 10/26/2008 Rel Insp Num: Packer Depth Pretest Initial l5 Min. 30 Min. 45 Min. 60 Min. --- WCII B-32A ~' a Itl•. ~ W TVD YP ~ ' -- 5429 IA 30 2510 2490 2490 ~ - P T. 1991780 TypeTest SPT 'l'est pSl 2107.25 i OA -- -- ----~------ 110 ] 10 - 110 - 110 --r- Interval aYRTST p~F P Tubing o i o 0 0 NOteS• 3.7 BBLS methanol pumped. ~~~ Wednesday, October 29, 200& Page I of 1 . . WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: AOGCC Records Department 333 W. 7th Ave Suite 100 Anchorage. Alaska 99501 RE: Cased Hole/Open Hate/Mechanical Logs and lor Tubing Inspection[Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8951 1 BL / EDE Disk B - 32A 25-Aug-06 Injection Profile 1 ] 2) 3) 4) 5) 6) 7) SCAN~EK) f:; ..-:: ( " Signed: j !!/~~~ (J /r"i ¿,-/1 "'e fJ1o,j"w~a v\ , Dat?2¿ '.' iJ;~ ~_;:;:::,:~ ,r -'-;",¡-'i',;;:~ ¡·"'::~''iT~n~\.~~:;'$'-·,(·:(1 ~. ~c.~.,. '" ~-.._~. "'""~~ Print Name: UXC- i ¡gO; -I/?¡- 'pi? /Lf / 1~í PRoAcTIVE DIAGNOSTIC SERVICES. INC.. 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E...MAfL: ::'0-.3.:","·:-'::-.'::' ~;.'::'i-3;::('0¡~,'1S.:,:-!O:~ "(1.-,') '3 .CO:".: WEBSfTE : \J\¡\'VF/.;'i¡E;\;¡:)R'/~CG.C<) :-'!1 C:'.DocwncnŒ and SettÍngs\PDS Anchorage ~ MPL'Desktöp\Transmn_Orig:rnaJ..doc ') ) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor K~'l,q wi a1 DATE: Wednesday, October 27,2004 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B-32A PRUDHOE BAY UNIT B-32A iCf;'"'" I /15 FROM: Chuck Scheve Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv ,Jrs¡.- Comm Well Name: PRUDHOE BAY UNIT B-32A Insp Num: mitCS041 027071704 ReI Insp Num: NON-CONFIDENTIAL API Well Number: 50-029-22165-01-00 Permit Number: 199-118-0 Inspector Name: Chuck Scheve Inspection Date: 10/26/2004 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well B-32A Type Inj. P TVD 8429 IA 280 4000 3970 3970 P.T. 1991180 TypeTest SPT Test psi 2107.25 OA 200 240 200 200 Interval OTHER P/F P Tubing 960 960 960 960 Notes: Test performed prior to converting well to MI injection. SCANNED NOV () 9 2004 Wednesday, October 27, 2004 Page 1 of 1 Permit to Drill No. 1991180 DATA SUBMITTAL COMPLIANCE REPORT 2/5/2002 Well Name/No. PRUDHOE BAY UNIT B-32A Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-22165-01-00 MD 11344 TVD 9094 Completion Date 12/22/1999 '"'" Completion Status WAGIN Current Status WAGIN UIC Y ~.~.£~..-_-~_~-_~_ _£~.~£-____~ '' 2~.~_~_£.~_-_ 2~_ .2'-- ' i ~__2_-_~ -'iT~ ,7~ ~' ~ '~ -- -' . ~ .... ~7~ -~.~'"~ - _ -- £ '. ~ 2' 2.2-- ~' 2." _.- '~27.2 '~7-'~7~7~_~. --~'-_~.'£ 2~ ~ REQUIRED INFORMATION Mud Log N__~o Samples ~ ~'5~. 5.22 ~22~ ~2' 2" _~_~_-'~ ._-~ -.~2-~12 ~-~--_' 2_~_.-~_~- ~ ~..__~.~ ,-~---~_~_2 .... ~i~ "~_ ~- -~2~_~_-_ .... ~5.~ . DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: No Directional Survey (data taken from .Logs Portion of Master Well Data Maint) Log/ Data Digital Digital Log Log Run Interval OH / Type Media Format Name Scale Media No Start Stop CH Received D ........ ~'~ NGP'MD ............ 25` ...... FiNaL 10368 344 ~1-1- ..... 5/2~'i'2~00 ,L--'"'" NGP-TVD 25 FINAL 8627 9027 OH 5/25/2000 D ~'/IL 25 FINAL 10110 11334 oR 1/26/2000 D tR/'/SRVY RPT 20 11344 OH 1/26/2000 D H~ SRVY LSTNG 20 Well Cores/Samples Information: Dataset Number Comments SPERRY 10272.. O 1/26/2000 09093~''''''' 10110-11334 11344 OH 1/26/2000 BH 10272.. O 5/25/2000 09560 c""'10308-11314 Interval Name Start Stop Sent Dataset Received Number Comments ADDITIONAL INFORMATION Well Cored? Y/~ Chjps.R,e.~[v~? A n al y sis,..l~ecci, cd~. ~f~l~-,, Daily History Received? ~/N Formation Tops Receuived? "~x~/N Corn ments: ---- STATE OF ALASKA ALASK/., .JIL AND GAS CONSERVATION CL ..,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Pull Tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Plugging [] Perforate []Alter Casing [] Repair Well [] Other 4. Location of well at surface 2142' SNL, 1609' WEL, Sec 31, T11N, R14E UM At top of productive interval 1710' SNL, 2224' WEL, Sec 06, T10N, R14E UM At effective depth (not available) At total depth 1830' SNL, 2340' WEL, Sec 06, T10N, R14E UM Acid 5. Type of well: II Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 67.48 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-32A 9. Permit Number / Approval No. 199-118 10. APl Number 50- 029-22165-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11344 feet true vertical BKB 9094 feet Effective depth: measured 11285 feet true vertical BKB 9045 feet Casing Length Size Structural Conductor 110' 20" Surface 2668' 13-3/8" Intermediate 10278' 9-5/8" Production Liner 286' 7" Sidetrack Liner 1243' 2-7/8" Plugs (measured) Junk (measured) Cemented 3719 c.f. Arcticset II/III 2188 c.f. Class 'G' 261 c.f. Class 'G' 168 c.f. Class 'G' MD TVD BKB 144' 144' 2702' 2698' 10312' 8698' 10042' - 10328' 8500' - 8710' 10101' - 11344' 8544' - 9094' Perforation depth: measured true vertical Open Perfs Open Perfs 11210-11236, 11246-11274 8976-9000, 9010-9035 Tubing (size, grade, and measured depth) 7" L80 tubing to 10042' Packers and SSSV (type and measured depth) 9-5/8" Baker Packer (SABL) @ 9946', 7" Baker FHL Liner Top Packer @ 10101' 7" SSSV Landing Nipple (Otis 'R' Nipple) @ 2097'. 13. Stimulation or cement squeeze summary Intervals treated (meaSured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Avera.qe Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed soot~ LaVo,e ~'~ ~ y~ Title Technical Assistant Prepared By Name/Number: Date ~-~'/t~'"'-/~ / '~ DeWayne ;9~'hnor~564-5174 ~ Form 10-404 Rev. 06/15/88 Submit In Duplicate 02/25/2001 02/26/2001 B-32A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ACID: PULL 4.5 ISSSV / DRITF ACID: PULL ISSSV/D&T SUMMARY 02/25/01 PULL 4.5 ISSSV / DRIIFT 02/26/01 PULL ISSSV / D&T WELL ON VACUUM WHEN LEFT LOCATION Fluids Pumped BBLS. Description 0 NO FLUIDS PUMPED 0 TOTAL 0 R I i--I--I ~! [:i ~ IE RI./I CIE ~ WELL LOG TRANSMITr~ To: State of Alaska May 25, 2000 Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs B-32& AK-MW-90210 1 LDWG formatted Disc with verification listing. API~: 50-029-22165-01 PLEASE ACKNO~DGE RECEIPT BY SIGNING AND RETURNING A COPY OF ~ TRANSMI'ITAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jan Galv~ 5631 Silverado Way,,Suite G. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 a Halliburton company WELl, LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs' B-32A, AK-MW-90210 May25,2000 B-32A: 2" x 5" MD Gamma Ray Logs' 50-029-22165-01 2" x 5" TVD CJamma Ray Logs' 50-029-221654)1 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND-RETURNING A COPY OF THE TRANSMlrlTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Atto: Jan Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 2 5 _000 Alaska 0i1 & Oas Cons. Gommi~{~ 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax' 907-273-3535 a Halliburton company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil E~ Gas [-I Suspended [] Abandoned [] Service Water & Gas Injector 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 199-118 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22165-01 ~4. Location of well at surface .... : -... 9. Unit or Lease Name 2142'SNL, 1609'WEL, SEC. 31, T11N, R14E, UM ' ' . i ' !~,~ Prudhoe Bay Unit At top of productive interval i'/2../~-~,,,2,¢,¢ ~~.0. Well Number 1710'SNL, 2224'WEL, SEO. 06, T10N, R14E, UM i .... (."7.'--7''/; . '~- B-a2A ( '.l'p, !,' i" Attotal depth ~ :~ ' 1. Field and Pool 1830' SNL, 2340' WEL, SEC. 06, T10N, R14E, UM ~.;;~: ' "' .' '~ ." Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial i'¢0~ KBE = 67.48' I ADL 028_313 Pool 12. Date Spudded12/15/99 I13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l 15' Water depth' if °ffsh°re I 16' N°' °f C°mpleti°nsl 2/18/99 12/22/99 N/A MSL, One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 11344 9094 FTI 11285 9045 FTI [] Yes [] No (Nipple) 2097' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, ROP, Memory Induction, Memory GR, CCL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 68¢ L-80 Surface 2702' 17-1/2" 3719 cu ft Arcticset II / III 9-5/8" 47# NT-80S Surface 10312' 12-1/4" 2188 cu ft Class'G' 7" 26# L-80 10042' 10328' 8-1/2" 261 cuft Class 'G' 2-7/8" 6.16# L-80 10101' 11344' 3-3/4" 1168 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 4 spf 7", 26#, L-80 10042' 9946' MD TVD MD TVD 11210'- 11236' 8976' - 9000' 11246' - 11274' 9010' - 9035' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2000' Freeze Protect with 34 Bbls of MeOH 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) January 6, 2000 I Water & Gas Injector U L Date of Test iHours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL iCHOKE SIZE IGAs-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATE OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. D 24-HOUR 28. RATE 'CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .... · ~ ..... ,'"" !.i"' -~t~ ~nchora!]o Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 10315' 8701' Shublik 'A' 10354' 8727' Shublik 'B' 10425' 8763' Shublik 'C' 10499' 8784' Shublik 'C' 10670' 8790' Shublik 'C' 10910' 8800' Sadlerochit / Zone 4B 11015' 8836' Zone 4A 11210' 8976' Zone 3 11282' 9043' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the fo. regoing is true and correct to the best of my knowledge Signed //,~.~~ ~ TerrieHubble , Title Technical Assistant III Date('~/ ~,~"~ ...- - ..._- B-32A 199-118 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. RECEIVED Form 10-407 Rev. 07-01-80 Well: B-32A Accept: 12/12/99 Field: Prudhoe Bay Spud: 12/15/99 APl: 50-029-22165-01 Release: 12/22/99 Permit: 199-118 CTD Unit: Nordic #1 12/13/99 1 Moved rig over well. Rig accepted at 20:00 hrs 12-12-99. ND tree cap. NU BOP stack. Tested BOPE. MU cementing assy. 1 2/14/99 2 10328' PU cmt'g assy. Repaired injection choke on flowline while w/o vac truck w/SW. RIH. Loaded well w/ SW. Held PJSM. Spotted 30 bbls 13.8 ppg cmt (w/8% gel). Sqz'd cmt. Held 500 psi sqz pressure. POH to safety @ 9700'. Circulated w/500 psi choke pressure. Washed dn to WS @ 10325'. POH. LD cmt assy. Held Safety meeting to discuss shackle near miss. Held PJSM. Washed cmt out of BOPE & choke manifold. MU window milling assy. RIH to WS tray. Corrected depth to 10328'. Attempted to mill @ 10328'. Multiple stalls w/o progress. POH to check motor & Mill. Held safety meeting w/night crew (1st night back) to discuss recent LClR's, Near Misses & accident reports. 2/15/99 3 10332' POH. Change mill to conventional dimple mill. Weatherford mill damaged in gauge area. RIH with BHA #2. Attempt to start window. Numerous stalls and no progress. POH. Change mill. RIH with BHA #3. Mill 10328-10330. Hold safety meeting with Nordic and new DS & BP personnel. Mill window to 10331.6'. Started getting multiple stalls and no further progress. POH to inspect mill and motor. Mill is undamaged and no indication of wear on face. Have to suspect motor is damaged or weak. MU new dimple mill and Baker motor. RIH. Work snags at top of window with new mill. RIH v. slow to bottom of window. Tag up and start milling. 1 2/16/99 4 10425' Milled window f/10333.9-334'. Milled formation to 10337'. Pumped sweep prior to POH. POH. LD dimple mill. PU 3.80" OD string reamer and 3.80" parabolic Diamond mill. Dressed window f/10328- 10334'. Drilled formation to 10339'. Displaced well to mud while POH. At surface. LD mills and motor. MU new CT conn. Pull & pressure test. MU BHA #6 (build assembly). RIH and shallow hole test MWD - OK. Cont RIH to 10230'. Orient tool face. RIH and work thru window. Tag btm and start drilling. Drill to 10398'. Correct depth to RA tag (-12'). Get clicks to reduce build rate and get some left turn. Drill ahead The stator in 3rd BHI motor was damaged resulting in a weakened motor. This motor milled f/10328.3- 10331.6'. 1 2/17/99 5 10860' Drilled to 10490'. Wiper trip to window (150' drilled). Drilled to 10612'. Lost partial returns (50%). Drilled to 10625'. Lost complete returns. POH to 10300' (above window). WO fluid. Mixed 30 bbls of MI Form-a-set pill in pill pit. Orient TF. Drill ahead to 10750 ft. Full returns. Short trip to window. Tied- in with RA tag and added 3 ft to CTD. RIH and drilled to 10860 ft in Shublik formation with full returns. RECEIVED JAN 2 6 2O0O Alask uornrni ion Ancflora~ B-32A, Coil Tubing Drilling Page 2 12/18/99 6 11344' Drilled to 10905' (No mud loss). Wiper trip to window. Drilled to 11055'. Wiper trip to window. Drilled to 11109'. Started losing mud (50% returns). Drilled to 11113'. 300 ft wiper trip. Drilled to 11,160 ft. Held Safety Meeting. Drilled to 11,240 ft. Mud losses of 0.6 BPM. Made short trip to window. Tied-in with RA tag. Added 9 ft. to CTD. RIH. Drilled to TD of 11,340 ft. Mud losses of 1 BPM. Trip to window. Tied in with RA tag. Added 4 ft to CTD. Final TD for well is 11,344 ft BKB. POOH for PDS Memory Induction / GR logs. Top of Zone 4 @ 11012' MD 8768' TVD. Top of Zone 3 at 11,273 ft MD, from ROP. 1 2/19/99 7 11344' POH to Icg. LD drilling BHA. Held safety meeting. PU & RIH w/memory induction tool string. Sat dn @ 11115'. Could not work past. POH for conditioning trip w/hole opener. LD logging BHA. PU Hole opener assy. RIH to 10490 ft. Sat down. Work thru. Sat down at 10510, 10571, 10900 and 11116 ft. Bit stuck at 11161 and 11279 ft. Could not work past 11279 ft. 3.75" OD hole opener has longer gauge than bit used to drill hole (drift problem, not hole problem). POOH for memory logging tools. Clean hole on trip out. L/O motor BHA. Safety Meeting. M/U PDS Induction / GR Memory logging BHA. RIH with BHA #9. Log down at 10,100 ft at 30 FPM to TD of 11,344 ft. Log up to 10,100 ft at 30 FPM. POOH with logging BHA. Reviewed CTD QPR with the DS/Nordic day and night crews. 1 2/20/99 8 11344' POH w/PDS. LD logging tools. Well taking 20 bph. Held PJSM. Ran 41 jts 2-7/8" 6.16 ppf L80 STL liner. MU Baker CTLRT. RIH w/liner assy. Sat dn in SSSV nipple. Found injection sleeve (3.813: ID) still in nipple. POH w/liner. Had to work liner top scoop head thru tree & BOP stack. LD CT LRT. Prep to stand back 2-7/8" liner. Freeze protect CT. Held Safety Meeting. Circ. and fill well. Stand back 20 doubles of 2 7/8" liner. Lay down single. Cut off 50 ft CT. Re-head CTC. M/U 7" GS fishing BHA with jars and accelerator. RIH with BHA #10. Latch onto SSSV insert. Jar up a total of 41 times and pull free. POOH. Recover 7" SSSV Insert. Lay out Baker fishing tools. Prep to run 2 7/8" liner. 1 2/21/99 9 11344' RIH w/41 jts 2-7/8" 6.16 ppf L80 STL liner from Derrick. MU Baker CTLRT to liner. RIH w/liner on coil to 11316' (CT depth). Released from Baker CTLRT. Circulated 100 bbls brine while mixing cmt. Pumped 30 bbls 15.8 ppg cmt slurry. Displaced w/2% KCI. Bumped plug. CIP @ 14:40 hrs. Floats held. Put 500 psi on coil. Pulled out of PBR. Circulated well to brine while POH @ 80%. Got back 50 bbis of contaminated mud & cmt. L/D Baker CTLRT. Held a Safety Meeting. M/U SWS Memory GR/CCL logging BHA. RIH with 42 Jts of CSH workstring. Deployed logging BHA on CT. Logged down from 10,000 ft to PBTD at 30 FPM. Tagged PBTD at 11289 ft CTD. Logged up to 10,000 ft and POOH. Pressure tested 2 7/8" Liner lap. KCL water pumped away at 1.0 BPM at 300 psi WHP. M/U Baker 7 .... FHL" Retrievable Production Packer and 3" seal assembly. RIH with Packer assembly. Preston Evans (SSD HSE Advisor), Shawn Mckeirnan (Nordic Toolpusher), Darin Bertollini (Nordic HSE) and Ruben Vela (Schlumberger HSE) conducted the Semi-annual Rig Condition and Environmental Audit. RECEIVED JAN 26 2O00 Oil & Gas Cons. B-32A, Coil Tubing Drilling Page 3 12/22/99 10 11344' RIH w/Baker 7" 'FHL' liner top packer and 3" seal assembly. Stung into PBR. Set packer with top at 10100'. Tested wellbore to 2200 psi. Released f/packer. POH w/packer running tool. LD packer running tool. Held safety meeting to discuss perforating. MU 2" perf gun assy (OAL:79.74'). RIH w/ perf assy on 21 stds 1-1/4" CS Hydril tbg. MU injector. RIH w/perf BHA. Sat down above top of liner in soft fill. Unable to work guns past fill. POOH. Stand back CSH. Safety Meeting. Lay out SWS 2" perforating guns. RIH with 2.25" mill and motor on CSH work string to cleanout liner. Cleanout from 10050' to PBD. Hole was clean. Pump 28 bbl used FIo Pro sweep at TOL, open circ sub and chase to surface with no recovery. Stand back CSH. Safety mtg. MU perf guns. RIH on 21 stds CSH. RIH on CT to PBD. Position guns, drop ball and displace to seat. Perforated 11210-236' and 11246-274' with 2" CTC guns at 4 SPF. POOH. 12/23/99 11 11344' POOH with perforating guns. Lay down 42 jts of CSH workstring. Safety Meeting. Lay out perforating guns. All shots fired. RIH with CT and freeze protect 7" tubing from 2000 ft to surface. Safety Meeting. Blow down CT with N2 and bleed down pressure. Perform maintenance on injector head. Cut CT and pull back to reel and secure it. Empty and clean rig pits. N/D BOPE. N/U tree cap and pressure test. Master valve and swab valve are closed and well is secure. Released Nordic #1 at 15:00 Hrs., 12-22-99. Total time on B-32A was 9 days and 19 hours. RECEIVED JAN 26 2000 Alaska Oil & Gas Cons. Commis~3e North Slope Alaska Alaska State Plane 4 PBU WOA B Pad B-32a Surveyed: 18 December, 1999 SURVEY REPORT ORIGINAL 4 January, 2000 Your Ref: A P1-500292216501 Surface Coordinates: 594'8507.14 N, 664060.13 E (70° 15' 56.3810" N, 148° 40' 24.3357" W) Kelly Bushing: 67.48ft above Mean Sea Level spenn~/-sun DRILLING SERVICES Survey Ref: svy9573 RECEIVED JAN 2 6 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Survey Report for B-32a Your Ref: API-500292216501 Surveyed: 18 December, 1999 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (fi) (ft) (fi) (fi) (fi) 10272.20 43.170 211.440 8601.93 8669.41 10324.00 43.460 212.690 8639.62 8707.10 10356.88 51.860 208.900 8661.75 8729.23 10387.93 60.200 206.060 8679.09 8746.57 10416.25 63.980 203.790 8692.35 8759.83 10448.10 70.040 201.510 8704.78 8772.26 10479.23 77.780 197.570 8713.41 8780.89 10509.58 82.180 203.370 8718.69 8786.17 10538.90 84.020 210.230 8722.22 8789.70 10569.08 86.920 218.320 8724.60 8792.08 10598.88 89.560 225.520 8725.52 8793.00 10629.00 91.140 233.960 8725.33 8792.81 10659.50 94.660 240.460 8723.79 8791.27 10692.73 95.010 248.900 8720.98 8788.46 10722.90 93.250 257.340 8718.81 8786.29 10752.75 91.140 262.790 8717.66 8785.14 10781.93 85.960 256.110 8718.40 8785.88 10811.28 86.400 248.020 8720.36 8787.84 10842.33 84.640 240.640 8722.79 8790.27 10873.28 81.470 232.550 8726.54 8794.02 10904.15 79.360 226.580 8731.68 8799.16 10933.58 76.200 222.010 8737.91 8805.39 10965.15 69.700 234.490 8747.20 8814.68 10994.93 62.840 241.870 8759.19 8826.67 11030.53 59.590 250.480 8776.36 8843.84 4405.00 S 128.52W 5944100.38 N 664027.63 E 4435.11 S 147.39W 5944069.87 N 664009.43 E 4455.99 S 159.77W 5944048.72 N 663997.50 E 4478.83 S 171.61W 5944025.64 N 663986.16 E 4501.52 S 182.15W 5944002.72 N 663976.12 E 4528.57 S 193.42W 5943975.43 N 663965.44 E 4556.73 S 203.40W 5943947.05 N 663956.08 E 4584.71S 213.85W 5943918.86 N 663946.24 E 4610.67 S 226.97W 5943892.61 N 663933.69 E 4635.51 S 243.90W 5943867.41 N 663917.31 E 4657.65 S 263.79W 5943844.84 N 663897.91 E 4677.10 S 286.75W 5943824.90 N 663875.37 E 4693.59 S 312.34W 5943807.86 N 663850.15 E 4707.74 S 342.24W 5943793.06 N 663820.56 E 4716.46 S 371.01W 5943783.71 N 663791.99 E 4721.61 S 400.38W 5943777.93 N 663762.74 E 4726.94 S 429.03W 5943771.97 N 663734.21 E 4735.95 S 456.87W 5943762.35 N 663706.58 E 4749.35 S 484.75W 5943748.35 N 663679.00 E 4766.24 S 510.37W 5943730.91 N 663653.74 E 4785.97 S 533.53W 5943710.68 N 663631.02 E 4806.54 S 553.62W 5943689.67 N 663611.39 E 4826.63 S 576.03W 5943669.10 N 663589.42 E 4841.02 S 599.14W 5943654.21N 663566.63 E 4853.64 S 627.62W 5943640.98 N 663538.43 E Dogleg Rate (°/100ft) 1.747 26.922 27.906 15.109 20.134 27.673 23.751 24.059 28.394 25.721 28.507 24.209 25.330 28.504 19.565 28.957 27.543 24.363 27.892 20.256 18.589 43.010 32.315 23.070 Alaska State Plane 4 PBU_WOA B Pad Vertical Section (ft) Comment 2861.52 2895.10 2917.83 2941.37 2963.81 2989.55 3014.98 3040.66 3067.16 3095.92 3125.29 3155.37 3185.64 3217.81 3245.70 3271.80 3297.47 3324.81 3354.93 3385.48 3415.89 3444.44 3474,49 3501.52 3531.62 Tie-on Survey Window Point Continued... 4 January, 2000 - 8:17 - 2 - DrillQuest 1.05.04e RECEIVED JAN 2 6 2000 Sperry-Sun Drilling Services Survey Report for B-32a Your Ref: API-500292216501 Surveyed: 18 December, 1999 North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 11062.88 53.610 254.530 8794.16 8861.64 4861.78 S 653.35 W 11092.20 46.760 249.430 8812.93 8880.41 4868.69 S 674.76 W 11127.03 39.460 239.760 8838.37 8905.85 4878.75 S 696.25 W 11157.43 35.070 229.740 8862.58 8930.06 4889.27 S 711.28 W 11187.03 26.980 222.360 8887.93 8955.41 4899.75 S 722.32 W 11216.53 22.320 211.280 8914.75 8982.23 4909.49 S 729.74 W 11249.55 21.010 190.010 8945.49 9012.97 4920.70 S 734.03 W 11280.73 27.070 175.420 8973.97 9041.45 4933.30 S 734.44 W 11313.73 35.330 173.490 9002.18 9069.66 4950.29 S 732.75 W 11344.00 35.330 173.490 9026.87 9094.35 4967.68 S 730.77 W 5943632.27 N 663512.88 E 5943624.90 N 663491.63 E 5943614.38 N 663470.37 E 5943603.53 N 663455.57 E 5943592.81N 663444.76 E 5943582.91 N 663437.55 E 5943571.61 N 663433.50 E 5943559.01 N 663433.37 E 5943542.05 N 663435.43 E 5943524.71 N 663437.79 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.243° (14-Dec-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 231.180° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11344.00ft., The Bottom Hole Displacement is 5021.15ft., in the Direction of 188.368° (True). Dogleg Rate (°/100ft) 21.230 26.900 28.225 24.597 30.156 22.186 23.983 27.093 25.210 0.000 Alaska State Plane 4 PBU_WOA B Pad Vertical Section (ft) Comment 3556.77 3577.78 3600.83 3619.14 3634.30 3646.20 3656.57 3664.78 3674.12 3683.48 Projected Survey Continued... 4 January, 2000 - 8:17 - 3 - DrillQuest 1.05.04e RECEIVED JAN 2 6 2000 North Slope Alaska Sperry-Sun Drilling Services Survey Report for B-32a Your Ref: API-500292216501 Surveyed: 18 December, 1999 Alaska State Plane 4 PBU_WOA B Pad Comments Measured Depth (ft) 1 O272.2O 10324.00 11344.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8669.41 4405.00 S 128.52 W 8707.10 4435.11 S 147.39 W 9094.35 4967.68 S 730.77 W Comment Tie-on Survey Window Point Projected Survey 4 January, 2000 - 8:17 - 4 - DrillQuest 1.05.04e 42O0 430O 4400 4500 4600 '-~ 4700 0 J 4800 V 4900 5OOO B.P. Exploration (True) Sirum'ure : Pod B Ffeld : Prudhoe Boy Well : B-32AI, 50-029-22165-01 Location : North Slope, Alaska 5100 <- West (feet) 1100 1000 900 800 700 600 500 400 300 200 1 O0 0 1 O0 200 300 I I I I ,, I II II II II Projected to TD Tie-in Point ORIGINAL Dale plotted: 29-Dee-1999 Plot Reference i~ Coordinates are in feet referer~ce True Vart(a(zl Depths are r~ference RKB - MSL - 67.48 ft, Brij Potn[s 267-6613 --- Roker Hughel INT£O 8-52N CoscSO1 Plan Projected to TD Tie-in Point 830O 8400 8500 8600 8700 8600 8900 9000 9100 i i i i i i i t i t ~ i i i i i i i i ii' i ~ ( i i i i i i i t i i ~ i i 92OO 1500 1400 1300 1200 llO0 1000 900 800 700 600 500 400 300 200 log 0 100 200 300 Vertical Secfion (feet) -> Azimuth 50.00 with reference 4406.68 S, 31.65 W from B-32 B.P. Exploration (True) Pad B B-32AI B-32 Prudhoe Bay North Slope, Alaska SURVEY LISTING Baker Hughes INTEQ Your ref : B-32AI Our ref : svy268 License : 50-029-22165-01 Date printed : 29-Dec-1999 Date created : 29-Dec-1999 Last revised : 29-Dec-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 665614.201,5950684.689,999.00000,N Slot location is n70 15 56.395,w148 40 24.332 Slot Grid coordinates are N 5948508.550, E 664060.210 Slot local coordinates are 2141.56 S 1601.61 W -Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North RECEIVED JAN 26 2000 B.P. Exploration (True) Pad B,B-32AI Prudhoe Bay, North Slope, Alaska SURVEY LISTING Page 1 Your ref : B-32AI Last revised : 29-Dec-1999 Measured Inclin Azimuth Subsea Depth Degrees Degrees Depth R E C T A N G U L A R Dogleg Vert G R I D C O 0 R D S C 0 0 R D I N A T E S Deg/100ft Sect Easting Northing- 10272.20 43.17 211.44 8602.07 10324.00 43.46 212.70 8639.76 10356.88 51.86 208.91 8661.89 10387.93 60.20 206.07 8679.22 10416.25 63.98 203.80 8692.48 4404.92S 128.54W 2.38 0.00 664028.64 5944102.17 4435.03S 147.41W 1.76 33.81 664010.44 5944071.65 4455.91S 159.79W 26.92 56.71 663998.52 5944050.51 4478.74S 171.64W 27.91 80.47 663987.18 5944027.42 4501.43S 182.18W- 15.11 103.13 663977.14 5944004.51 10448o10 70.04 201.52 8704.91 10479.23 77.78 197.58 8713.54 10509,58 82.18 203.38 8718.82 10538.90 84.02 210.24 8722.35 10569.08 86.92 218.33 8724.74 4528.48S 193.45W 20.13 129.15 663966.46 5943977.22 4556.65S 203.44W 27.67 154.90 663957.10 5943948.84 4584.62S 213.89W 23.75 180.89 663947.26 5943920.65 4610.58S 227.02W 24.06 207.63 663934.71 5943894.41 4635.41S 243.95W 28.39 236.57 663918.33 5943869.21 10598.88 89.56 225.53 8725.65 10629.00 91.14 233.97 8725.47 10659.50 94.66 240.47 8723.92 10692.73 95.01 248.91 8721.12 10722.90 93.25 257.35 8718.94 4657.56S 263.84W 25.72 266.04 663898.93 5943846.64 4677.00S 286.81W 28.51 296.13 663876.40 5943826.70 4693.48S 312.40W 24.21 326.33 663851.18 5943809.65 4707.62S 342.31W 25.33 358.33 663821.60 5943794.86 4716.35S 371.08W 28.50 385.97 663793.03 5943785.51 10752.75 91.14 262.80 8717.80 10781.93 85.96 256.12 8718.53 10811.28 86.40 248.03 8720.49 10842.33 84.64 240.65 8722.92 10873.28 81.47 232.56 8726.67 4721.48S 400.44W 19.57 411.77 663763.78 5943779.72 4726.81S 429.10W 28.96 437.15 663735.26 5943773.76 4735.82S 456.94W 27.54 464,26 663707.62 5943764.15 4749.21S 484.82W 24.36 494,23 663680.04 5943750.15 4766.10S 510.45W 27.89 524,72 663654.79 5943732.70 10904.15 79.36 226.59 8731,81 10933.58 76.20 222.02 8738,05 10965.15 69.70 234.50 8747.33 10994.93 62.84 241.87 8759.32 11030.53 59.59 250.49 8776.49 4785.82S 533.61W 20.26 555,14 663632.07 5943712.47 4806.39S 553.70W 18.59 583,75 663612.44 5943691.47 4826.47S 576.12W 43.01 613.83 663590.47 5943670.90 4840.86S 599.22W 32.29 640.78 663567.69 5943656.01 4853.48S 627.71W 23.09 670.71 663539.49 5943642.77 11062.88 53.61 254.54 8794.29 11092.20 46.76 249.44 8813.06 11127.03 39.46 239.77 8838.50 11157.43 35.07 229.75 8862.71 11187.03 26.98 222.37 8888.06 4861.62S 653.44W 21.23 695.65 663513.95 5943634.07 4868.52S 674.85W 26.90 716.49 663492.70 5943626.69 4878.58S 696.34W 28.23 739.42 663471.43 5943616.17 4889.10S 711.37W 24.60 757.70 663456.64 5943605.32 4899.58S 722.41W 30.16 772.89 663445.83 '5943594.60 11216.53 22.32 211.29 8914.88 11249.55 21.01 190.02 8945.62 11280.73 27.07 175.43 8974.10 11313.73 35.33 173.50 9002.31 11344.00 35.33 173.50 9027.00 4909.32S 729.84W 22.19 784.84 663438.62 5943584.70 4920.52S 734.13W 23.98 795.33 663434.58 5943573.40 4933.12S 734.54W 27.09 803.74 663434.45 5943560.80 4950.12S 732.86W 25.21 813.38 663436.50 5943543.85 4967.51S 730.88W 0.00 823.04 663438.87 5943526.50 RECEIVED JAN 26 2000 Alaska Oil & Ga~ Cons. All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from B-32 and SSTVD from RKB - MSL = 67.48 ft. Bottom hole distance is 5020.99 on azimuth 188.37 degrees from wellhead. Vertical section is from tie at S 4404.92 W 128.54 on azimuth 230.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ TRANSMI AL To; State of Alaska AOGCC Lori Taylor 3001 Porcupine St. Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Robert Richey PDS, Inc. Mail Pouch 340112 Prudhoe Bay, AK 99734 BP Exploration (Alaska), Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT[S] OR CD-ROM FILM BLUELINE ~ Open Hole I I 1 q~- t~ g Res. Eval. CH I I ~ , Mech. CH Caliper Su~ey /ED I Rpt or r~,, I BL Date' , ,~ 26 2~000 Signed' "%._ _ fi_A,/.\ _ / Print Name: ~.~ AI~ ~[ & Gas ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 Phone:(907)659-2307 Fax:(907)659-2314 E-mail: pdspmdhoe~NA800.net Website: www.memorvlo;,.com TONY KNOWLES, GOVERNOR ALAS~ OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 R. ez Prudhoe Bay Unit B-32A BP Exploration (Alaska), Inc. Permit No: 199-118 Sur Loc: 2142'SNL, 1609'WEL, Sec. 31, TllN, R14E, UM Btmhole Loc. 1803'SNL, 2430'WEL, Sec. 06, T10N, R14E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christenson, P.E. Chair BY ORDER OF TH~IMISSION DATED this ~ ,u~ day of December, 1999 dlf/Enclosures CC2 Department of Fish & Gatne. Habitat Section w/o encl. Department of Environmental Consen'ation w/o encl. STATE OF ALASKA ALASl ,.OILAND GAS CONSERVATION CO IISSlON PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 67.48' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028313 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2142' SNL, 1609' WEL, SEC. 31, T11N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 29100302630-277 1381' SNL, 1627' WEL, SEC. 06, T10N, R14E, UM B-32A At total depth 9. Approximate spud date Amount $200,000.00 1803' SNL, 2430' WEL, SEC. 06, T10N, R14E, UM 12/11/99 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (ME) and TVD) ADL 028310, 1803' MDI No Close Approach 2560 11341' MD / 8993' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10324' MD Maximum Hole Angle 88° Maximum surface 2328 psig, At total depth (TVD) 8800' / 3384 psig 18. Casing Program Specifications Setting Depth Size Top Bottom . Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 1241' 10100' 8475' 11341' 8993' 84 cu ft Class 'G' , ,,,,, ,, 19. To be completed for Redrill, Re-entry, and Deepen Operations..¢t~,. /¢0 [,/ :.' i;i:..~,~,~--,9 Present well condition summary ' Total depth: true verticalmeasured 110009191 feetfeet Plugs(measured) O~~,~t'~L-IC'~l~ru~O//~(~'a$C°lT~,COr~.~, Effective depth: measured 10958 feet Junk (measured) ,~!7Cf70.,~ true vertical 9161 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 138' 138' Surface 2674' 13-3/8" 3719 cu ft Arcticset II & III 2702' 2702' Intermediate 10284' 9-5/8" 2188 cuff Class 'G' 10312' 8699' Production Liner 958' 7" 261 cu ft Class 'G' 10042' - 11000' 8500' - 9191' Perforation depth: measured Sag River: 10324'- 10350'; Sadlerochit: 10472'- 10740' (seven intervals) true vertical Sag River: 8707' - 8726'; Sadlerochit: 8815' - 9008' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements ,, Contact Engineer Name/Numbec Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 21 I hereby certify that the f~.. · going is true and correct to the best of my knowledge Signed Ted Stagg Title CT Drilling Engineer Date / · Commission Use Only /~:~-*///~, 50-029-22165-01 /~. -.. ~" ~*/ for other requirements Conditions of Approval: Samples Required [] Yes [~ No Mud Log Required [] Yes [~No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required ,~_Yes [] No Required Working Pressure for DOPE I-'12Ki ,~[,3K; I'-I 4K; I-I 5K; I-I 10K; [] 15K Other: ~,O-~ "r~-~ ~ ~k.OL~4~ ~--~, r,:x.--~ by order of Approved By ORIGINAL SIt~kii:r'l. Rv Commissioner the commission Date Form 10-401 Rev. 12-01-85 Robert N. Christenson Submit In Triplicate BPX B-32ai Sidetrack Summary of Operations: B-32 is being sidetracked to improve injection conformance. Zone 4B is the targeted injection interval. This sidetrack will be conducted in two phases. Phase 1: Set Whipstock: Planned for Dec. 6, 1999, · A Mechanical Integrity Test was successfully performed on 4/2799. · The whipstock drift and Kinley caliper were run on 5/2/99. · A Schmoo-B-Gone treatment was pumped on 5/1/99. · E-Line will be used to set the mechanical whipstock at 10,325' MD. Phase 2: Cement perfs, mill window and drill sidetrack: Planned for Dec. 11, 1999. Directional drilling coiled tubing equipment will be rigged up and utilized to cement perforations,mill the window and drill the directional hole as per attached plan to planned TD of 11,341' MD (8,993' TVDss). Mud Program: · Phase 2: Seawater and FIo-Pro (8.7 - 8.8 ppg) Disposal: - No annular injection on this well. - All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. - All Class I wastes will go to Pad 3 for disposal. Casing Program: - 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 10,100' MD and cemented with approx. 15 bbls. cement to bring cement 200 ft above the window. The liner will be pressure tested to 2200 psi and perforated with coiled tubing conveyed guns. Well Control: - BOP diagram is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - Kick Off: 10,324' MD (8,640' TVD ss) - TD: 11,330' MD (8,986' TVD ss) - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · A Gamma Ray log will be run over all of the open hole section. · Open hole will be logged with Memory Induction log. Hazards One fault in the Shublik with lost circulation potential will be crossed with this well path. TREE: 6" CIW WELLHEAD: 13-5/8" 5M r'--~ ACTUATOR: OTIS B-32ai Pro Corr---'letion KB. ELEV = 67.48' BF. ELEV = 39.63' 13 3/8", 68 #/ft, L-80, BTRS LANDING NIPPLE ( OTIS "R"Nipple)(5.962" ID) 12,097' KOP: 3600' MAX ANGLE: 7", 26#/ft, L-80, IJ4S/TC4S TUBING TUBING ID: 6.276" CAPACITY: .0382 BBL/FT TOP OF 7" TIW 110,042' LINER HANGER 9 5/8", 47#/ft, 110,312' I NT-80S, NSCC Top of whipstock approx. 10,325' MD PERFORATION SUMMARY REF LOG: ATLAS - BHCA 6-2-91 ISlZESPF INTERVAL OPEN/SQZ'D 4 1/2" 5 10,324'-10,350' Open 8/25/91 4 1/2" 5 10472 -10492 open 9/18/91 4 1/2" 5 10496 -10540 open 9/18/91 4 1/2", 5 10550 -10584 open 9/18/91 4 1/2" 5 10594 -10654 open 9/17/91 4 1/2" 5 10658 -10676 open 9/17/91 4 1/2" 5 10704 -10712 open 9/17/91 4 1/2" 5 10718 -10740 open 9/17/91 TIE-IN LOG' SWS CET (6-$-91) PBTD 7", 26 #/ft, NT80-S NSCC 11o,952' I Ill,OOO' I TUBING ANCHOR SEAL NIPPLE 9-5/8" BAKER PACKER I 9,946'1 (SABL)(6.00"ID) 7", 26#/ft, L-80 7 .... R" NIPPLE (OTIS) (5.963" ID) I9,999'1 7" DUMMY SEAL 110,046,I ASSEMBLY 2 7/8" liner cemented approx. 200 ft above the window. . . . - ..... ; :'. .;',' . ~ .-: ~ t .:,:: ..- ;~ :.¢, .:t :. 'D" :; '.% ~. f.t':; '::' ¢ B-32 Vertical Section 0 8600 8650 8700 8750 .... 8,785 8800 8850 8900 8950 9000 9050 500 Path Distance (Feet) 1,000 1,500 I I Angle @ K,O.= 43 deg MD:10324 fault in Shublik 2,000 2,500 Tot Drld:1006 ft 11330 TD Marker Depths ~:)ri~ Wellbore TSAG TSHU TSAD 8,7231 I 8,6341ft TVD 8,6S81,-TVD 8,7231ft TVD IKick Off I 8,640 ft TVD 10,324 ft MD IDeprtr @KO 4,453 ft IMD KO Pt 10,324 MD New Hole 1006 Total MD 11,330 TVD TD 8,986 Curve I DLS deg/100 Tool Face Len~lth 6 0 35 -5 10 90 10 172 22 -180 20 Curve 2 125 Curve 3 340 Curve 4 260 Curve 5 264 1,009 Drawn: ######## 14:44 Plan Name: Case 501 -1,000 -500 B-32 fault in Shublik 785 -4~eEH- 5[ -4,500 -5,000 X distance from Sfc Loc -5,500 IWellName B-32 I CLOSURE IDistance 5,006 ft Az 188 de~l NEW HOLE E/W (X) N/S (Y) Kick Off -51 -4,437 lTD -695 -4,957 State Plane 663,365 5,943,551 ;urface Loc 664,060 5,948,509 DLS dec)/100 Tool Face Len~lth Curve 1 6 0 ~0 Curve 2 35 -5 125 Curve 3 10 90 340 Curve 4 10 172 260 Curve 5 22 - 180 264 1,009 Drawn: ######## 14:44 Plan Name: Case 501 2 3/8" CT ~ I I 10,000 psi Pack-Off Lubricat°rt I B-32ai CT Drilling & Completion BOP LU 36" 22.5" 7 1/16" Annular 7 1/16' 5000 psi Blind/Shear 71/16" Pipe/Slip 7 1/16' x 5,000 psi 7 1/16' x 5,000 psi Slips 71/16" Pipe 2 3/8" SWAB OR MASTER VALVE 2 7/8" 2 3/8" STATE OF ALASKA ..... ALASKA ~ ,~- AND GAS CONSERVATION CO,...vllSSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Pedorate [] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2142' SNL, 1609' WEL, SEC. 31, T11N, R14E, UM At top of productive interval 1381' SNL, 1627' WEL, SEC. 06, T10N, R14E, UM At effective depth 570' SNL, 1530' WEL, SEC. 06, T10N, R14E, UM At total depth 1695' SNL, 2012' WEL, SEC. 06, T10N, R14E, UM 12. Present well condition summary Total depth: measured 11000 feet true vertical 9191 feet Effective depth: measured 10958 feet true vertical 9161 feet Casing Length Size Structural Conductor Surface Intermediate Production Liner measured true vertical Plugs (measured) Junk (measured) 110' 2674' 10284' 958' Type of well: ~ Development ~ Exploratory J--~ Stratigraphic [~Service 6. Datum Elevation (DF or KB) KBE = 67.48' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-32 9. Permit Number 191-60 10. APl Number 50- 029-22165 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool TVD 138' 2702' 8699' Perforation depth: 20" ~ ~ ~ /\ 13-3/8" 3719c~ft~ti~et II & III 9-5/8" 2188 cu;~/Class ',G' 7" .26~ cO:ft Class 'G'X'''~ Sag Ri~er: 10324' - 10350'; Sag Rivo '~87 7' - 8726'; !'~',,.j ,.. 138' 2702' 10312' 10042'-11000' 8500'-9191' Sadlerochit: 10472' - 10740' (seven intervals) Sadlerochit: 8815' - 9008' Tubing (size, grade, and measured depth) 7", 26#, L-80 to 10042' Packers and SSSV (type and measured depth) 13-3/8" x 9-5/8" Baker packer at 9946'; Otis 'R' SSSV Nipple at 2097' 13. Attachments ~ Description summary of proposal i--I Detailed operations program i-~ BOP sketch 14. Estimated date for commencing operation December 6, 1999 ' 16. If proposal was verbally approved Name of al)prover Contact Engineer Name/Number: Date approved Ted Stagg, 564-4694 I15. Status of well classifications as: [--[ Oil [---[ Gas [~ Suspended Service Water Injection Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify thatthe f~~strue and correct to the best of my knowledge Signed T~d Stagg ~ ~ Title CT Drilling Engineer Commission Use Only Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance Approval No. Mechanical Integrity Test Subsequentformrequired 10- Al)proved by order of the Commission Commissioner Date Form 10-403 Rev. 06/15/88 Submit In Triplicate I DATE I CHECK NO. 1 H 158194 1 VENDOR ALi~SKAST ~ 4 O0 DATE INVOICE / CREDIT MEMo DEscRIPTiON. GROSS DISCOUNT NET 10~799 CK 102799(~ 100. O0 100. O0 HANDLING INST' S/H TERRIE HUBBLE X4628 THE A~ACHED CHECK IS IN PAYME~ FOR ~ ~nle~ A~. m(1)fil~ a 1 OO. OO 10~ O~ H BP.EXPLORATION (ALASKA)~JNC '~..,:.:~ ' AN'C'HO~AGE;:'ALASKAl:: 99519-6612 :::::;:.' .,':,~:i: 'ii: FiSST':NATI~.:BANK OF ASHI~I~ND ".'.>.i; ,' "i' :AN:'AI~IUATE OF .:::i:i'i '.::' :CEEV~AND OHI0 · ,: ~ ' : . ::: ~:.: 56-389: ~ ..: .... :: 412 No. :H CONSOLIDatED COMMERCIAL ACCOUNT': O0158:194': PAY To: The ORDER ': . : : :. .' ::: .. -..: .: . .:. ' : i: : DATE AMOUNT · ALASKA STATE 'DEPT OF RE~/ENUE AOoCCi.' " 3OO1 .: PORCUPINE ::DR . : 10/28/99 I NOT VALID AFTER 120 DAYS ' .. $100.00 ANCHORAOE AK 99301-3120 Il' 1,58;t, qh"' ':Oh WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRATION COMPANY ,~'~ '.c./(~/Z~_~ ~,: INIT CLASS 1. Permit fee attached ....................... ~N Lease number appropriate ................... ~,~" N Unique well name and number ................... N Well located in a defined pool .................. ~N Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... ~y~.),N Sufficient acreage available in drilling unit ............ L"~) N If deviated, is wellbore plat included ............... ~/..N Operator only affected party ................... (_~.~_~. N Operator has appropriate bond in force ............. ~ N Permit can be issued without conservation order ........ t~i~ N Permit can be issued without administrative approval ...... Y N Can permit be approved before 15-day wait ........... N . 3. 4. 5. 6. 7. 8. 9. 10. 11. DAT~ .~.~ 12. ENGINEERING WELL NAME/5.,~/'/' ,/'~"' ~72/~ P~ROGRAM: exp ~ GEOLOGY ,Z'~"~I/,"LL.i GEOL AREA 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ ~Y N 18. CMT will cover all known productive horizons .......... I,~ N 19. Casing designs adequate for C, T, B & permafrost ....... ~ N 20. Adequate tankage or reserve pit ................... N 21. If a re-drill, has a 10-403 for abandonment been approved... ~ N 22. Adequate wellbore separation proposed ............. '(~ N 23. If diverter required, does it meet regulations .......... .--Y---N 24. Drilling fluid program schematic & equip list adequate ..... ~'~' N 25. BOPEs, do they meet regulation ................ ~ N 26. BOPE press rating appropriate; test to ~4,~-_-,C..3 .psig. ~~ N 27. Choke manifold complies w/APl RP-53 (May 84) ........ Y) N 28. Work will occur without operation shutdown ........... N 29. Is presence of H2S gas probable ................. N dev __ redrll v'" serv v" wellbore seg ann. disposal para req __ 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... UNIT# t"_~')~///~' ,.~--C~"') ON/OFF SHORE 32. ANNULAR DISPOSAL 35. APPR DATE Seismic analysis of shallow gas zones ............. ,~A Y N Seabed condition survey (if off-shore) ............. /J~.,.Y~ N Contact name/phone for weekly progress reports [exploratory only~ N With proper cementing records, this plan ~ o,--,,--,,,.~\~--',,,,q,~._~,~.-~. ~-~c.,..:.~._~-~. ~. (A) will contain waste in a suitable receiving z.~...e;.-.~ ...... '~ (B) will not contaminate freshwater; or ca. Bt, u~drilling waste... Y N ,/~-/?' t~/.:, to surface; ~ .... '"// (C) will not impair mechanical int/e~rity of the wel! used for disposal; Y N (D) will not damage producin9/,fOrmation or impair recovery from a pool; and (E) will not circumvent 20 ,¢AC 25.252 or 20 AAC 25.412. Y N GEOLOGY;<,. ENGINEERING: UIC/Annular COMMISSION: SFD~ . Comments/Instructions: c:\msoffice\wordian\diana\checklist (rev. 09~27~99) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue May 16 13:00:50 2000 Reel Header Service name ............. LISTPE Date ..................... 00/05/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 00/05/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING MWD RUN 1 AK-MW- 90210 STEVE LATZ HUPP/MASKELL OPEN HOLE BIT SIZE 3.750 (IN) B-32A 500292216501 BP Exploration (Alaska), Sperry Sun 16-MAY-00 Inc. 31 liN 14E 2142 1609 67.48 .00 39.63 RECEIVED MAY 2,5 000 Alaska Oil & Gas Cons. Commission Anchorage CASING DRILLERS SIZE (IN) DEPTH (FT) 7.000 10325.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 3. DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC LOG OF 12/19/99 (PDS GR) WITH A KBE OF 67.48' AMSL. KICKOFF POINT FOR THIS WELLBORE IS AT 10325' MD, 8640' SSTVD (TOP OF WHIPSTOCK). 4. MWD RUN 1 REPRESENTS WELL B-32A WITH API# 50-029-22165-01. THIS WELL REACHED A TOTAL DEPTH OF 11344' MD, 9027' SSTVD. SGRD = SMOOTHED GAMMA RAY SROP = SMOOTHED RATE OF PENETRATION $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/05/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10308.0 11314.5 ROP 10328.0 11344.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 10308.0 10315.0 10319.5 10330.5 10333.5 10335 0 10337 0 10342 0 10344 0 10348 5 10358 0 10361 0 10365 5 10368 0 10385 0 10388 0 10390 0 10396 5 10406 0 GR 10307 0 10314 0 10319 0 10330 5 10334 0 10335 5 10336 5 10341 0 10344 0 10348 0 10357 5 10360 5 10365 0 10367 0 10382 0 10385 5 10389.0 10395.5 10406.0 EQUIVALENT UNSHIFTED DEPTH 10410 10417 10421 10422 10435 10438 10446 10450 10455 10459 10465 10469 10472 10475 10477 10482 10484 10486 10494 10498 10499 10502 10518 10520 10524 10531 10535 10550 10552 10582 10587 10588 10590 10594 10597 10599 10602 10604 10607 10612 10615 10654 10657 10660 10672 10685 10691 10695 10696 10698 10700 10702 10705 10721 10729 10736 10739 10749 10846 10854 10855 10857 10887 10891 10892 10895 10897 10900 .5 .5 .0 .5 .5 .5 .5 .0 5 0 0 5 5 0 5 5 5 5 0 0 0 5 5 5 0 0 .5 5 5 5 0 5 5 5 0 0 0 0 5 0 5 .0 .5 .5 .0 .5 .5 .0 5 0 0 5 5 0 5 0 5 5 0 0 0 5 5 0 5 0 0 5 10410 10417 10420 10423 10435 10439 10446 10450 10456 10460 10464 10468 10472 10474 10477 10482 10484 10486 10493 10497 10498 10503 10517 10521 10525 10531 10536 10549 10552 10582 10585 10587 10589 10594 10596 10599 10601 10604 10607 10610 10614 10654 10658 10660 10672 10685 10692 10695 10698 10700 10702 10704 10706 10720 10729 10736 10738 10749 10847 10854 10855 10858 10889 10891 10893 10896 10898 10900 5 5 5 5 5 0 5 0 0 0 5 .5 0 0 0 0 0 0 0 0 5 5 5 0 5 5 0 5 0 0 5 0 5 0 0 0 5 0 0 5 0 0 5 .5 0 5 0 5 0 0 5 0 5 5 0 0 5 5 5 0 5 0 0 5 0 5 0 0 10905 5 10907 0 10910 0 10912 5 10915 5 10921 0 10929 0 10934 0 10939 5 10945 5 10949 5 10960 5 10965 0 10967 5 10976 5 10978 0 10980 0 10981 0 10983 5 10989 5 10992 0 10997 0 11009 0 11015 5 11027 5 11028 5 11030 5 11033 5 11036 0 11041 0 11042 5 11052 0 11058.0 11078 0 11083 0 11086 0 11091 5 11093 5 11099 5 11108.0 11114 0 11118 0 11121 5 11123 5 11129 5 11135 0 11155 0 11163 5 11165 5 11174 0 11185 5 11189 5 11193 0 11196 5 11208 5 11211 5 11215 0 11232 5 11239 5 11252 5 11254 0 11255 0 11260 5 11264 0 11282 .5 11284 .0 11285.0 11307.5 10905.5 10906.5 10909.0 10912.0 10915 5 10920 5 10929 5 10935 0 10940 5 10946 5 10950 0 10963 0 10966 0 10970 0 10976 0 10978 5 10981 0 10982 0 10983 5 10989 0 10991 5 10997 0 11009 0 11015 5 11027 5 11028 5 11029 5 11032 0 11034 0 11038 0 11040.0 11050 0 11056 0 11077 5 11082 0 11085 5 11089 5 11092 0 11098 0 11107 0 11112 5 11116 0 11119 5 11122 5 11129 0 11135.0 11155.5 11163 5 11166 0 11175 0 11185 0 11188 5 11191 5 11196 0 11209 0 11212 0 11215 0 11232 0 11239 0 11252 5 11254 5 11256 0 11260 0 11264 0 11282 0 11283 5 11285 5 11307 5 11344.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMJIRKS: 11344.0 BIT RUN NO MERGE TOP MERGE BASE 1 10307.0 11344.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 10308 11344 10826 2073 ROP MWD FT/H 5.12 481.1 46.3508 2033 GR MWD API 19.7 880.8 142.615 2014 First Reading 10308 10328 10308 Last Reading 11344 11344 11314.5 First Reading For Entire File .......... 10308 Last Reading For Entire File ........... 11344 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/05/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/05/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10307.0 ROP 10328.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data ReferenCe Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 STOP DEPTH 11314.5 11344.0 18-DEC-99 Insite 7.74 Memory 11344.0 21.0 95.0 TOOL NUMBER 042 3.750 10325.0 Flo Pro 8.65 65.0 8.8 24000 8.0 .000 .000 .000 .000 .0 140.0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 10307 11344 10825.5 2075 ROP MWD010 FT/H 5.12 481.1 46.5916 2033 GR MWD010 API 19.7 880.8 142.775 2016 First Reading 10307 10328 10307 Last Reading 11344 11344 11314.5 First Reading For Entire File .......... 10307 Last Reading For Entire File ........... 11344 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/05/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 00/05/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 00/05/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File