Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-018Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning.
They are available in the original file, may be scanned during the rescan activity or are viewable
by direct inspection of the file.
Well History File Identifier
Organization (done) [] Two-Sided
RESCAN DIGITAL DATA OVERSIZED (Scannable)
o,,~.-Olor items: ~'~Diskettes, No. / [] Maps:
~ GrayScale items: [] Other, No/Type [] Other items scannable by
large scanner
[] Poor Quality Originals:
OVERSIZED (Non-Scannable)
[] Other:
[] Logs of various kinds
TOTAL PAGES' ~_~ ~ NOTES'
ORGANIZED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL
[] Other
Project Proofing
[] Staff Proof
By: Dale:
PROOFED BY: BEVERLY BR~SHERYL MARIA LOWELL
Scanned (done)
P~-G ES'
SCANNED BY:
(a eim
BEVERLY BREN MINC~MARIA LOWELL
ReScanned (done)
RESCANNEDBY: BEVERLY BREN VINCENT SHERYL M4RIA LOWELL DATE:
Is~
General Notes or Comments about this file:
PAGES:
Quality Checked (done}
RevlNOTScanned.wpd
From: Maunder, Thomas E (DOA)
Sent: Monday, October 20, 2008 2:13 PM
To: 'McLaughlin, Sean M'
Subject: RE: J-05B naming convention
Sean,
Since you plan to either be "in" or parallel the current penetration, to keep it simple, let's proceed as if you'll exit
the bottom of the well.
Tom
From: McLaughlin, Sean M [mailto:Sean.McLaughlin@bp.com]
Sent: Monday, October 20, 2008 12:15 PM
To: Maunder, Thomas E (DOA) ~w ~lI.:~5:~1 ~(~~~ ~. ~ 2[~Q$
Subject: RE: J-05B naming convention
Tom,
tJnforkunately, this sidetrack may not be as straightforward as I hope. The current OH completion has not been
entered since it was drilled 8 years ago. There is a chance of debris in the well or a partially collapsed hole
preventing us from drilling out the bottom as planned. In this case we plan drill ahead parallel to the old hole and
continue to our new bottom hole location. If this happens what would you like to see from us?
Thanks;
Sean
From: nder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Mon October 20, 2008 11:39 AM
To: McLaughlin, an M
Cc: Hubble, Terrie L
Subject: RE: J-056 nam convention
Sean,
I checked with Steve Davies, my no
You are correct that no sundry is need
When J-05C is completed, we will adrr
Call ar message with any questions.
Tom Maunder, PE
AOGCC
From: McLaughlin, Sean M [mai
Sent: Monday, October 20, 2
To: Maunder, Thomas E A)
Cc: Hubble, Terrie L
clature consultant.
r J-05B since yo e "drilling out of the bottom".
iistr ~vely aban J-05B.
a'.Sean.McLaughtin@bp.com]
11:15 AM
Subject: RE: J-0 naming convention
Tom,
I'm working on the permits for J-05C and CL1. Any new thoughts on the sundry for J-05B? At this
planning on submitting one for J-05B.
f'm nat
10/20/2008
J-OSB naming convention
•
Maunder, Thomas E (DOA)
Page l o£~
From: Maunder, Thomas E (DOA)
Sent: Monday, October 20, 2008 11:39 AM
To: 'McLaughlin, Sean M'
Cc: Hubble, Terrie L
Subject: RE: J-05B naming convention
goo-ot~
Sean,
I checked with Steve Davies, my nomenclature consultant.
You are correct that no sundry is needed for J-056 since you are "drilling out of the bottom".
When J-05C is completed, we will administratively abandon J-05B.
Call or message with any questions.
Tom Maunder, PE
AOGCC
From: McLaughlin, Sean M [mailto:Sean.McLaughlin@bp.com]
Sent: Monday, October 20, 2008 11:15 AM
To: Maunder, Thomas E (DOA)
Cc: Hubble, Terrie L
Subject: RE: J-05B naming convention
Tom,
I'm working on the permits for J-05C and CL1. Any new thoughts on the sundry for J-056? At this point I'm not
planning on submitting one for J-056.
Thanks,
Sean
From: Maunder, Thomas E (DOA) [mailta:tom.maunder@alaska.gov]
Sent: Friday, October 03, 2008 9:52 PM
To: McLaughlin, Sean M
Subject: RE: J-05B naming conven#ion
Let me check on the need for a sundry on Monday. I believe I remember other similar operations where the
sundry was not needed. You apply for the new permit to drill and then we (AOGCC) administratively abandon the
original hole when the new 407 is filed.
Tom
From: McLaughlin, Sean M [mailto:Sean.McLaughlin@bp.com]
Sent: Fri 10J3/2008 3:27 PM
To: Maunder, Thomas E (DOA)
Subject: RE: J-05B naming convention
No, we are just in the initial planning stages of J-05B. The C and CL1 convention makes sense. I couldn't get
past submitting a sundry for a well that was remaining open. So to confirm, I would submit the following to the
state:
Sundry for J-05B -justification would be change of bottom hole location
Permit for J-05C -for deepening the well
10/20/2008
J-OSB naming convention
Permit for J-05CL1 -for the new lateral.
Thanks,
sean
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Friday, October 03, 2008 3:04 PM
To: McLaughlin, Sean M
Subject: RE: J-056 naming convention
•
Page 2 of 2
Sean,
I presume you are not on J-056 right now, correct?
I believe the correct well names would be J-05C and J-05CL1. If you just drill out of the bottom of the present
well, then the extension becomes "C" because a new primary BHL is established. If you were to exit the present
wellbore other than at TD, then the names you proposed would apply.
Tom
From: McLaughlin, Sean M [maiito:Sean.McLaughlin@bp.com]
Sent: Friday, October 03, 2008 3:00 PM
To: Maunder, Thomas E (DOA)
Subject: )-056 naming convention
Tom,
We are thinking about performing a 700' extension the current openhole completion then adding another lateral.
The current wellbore is J-05B. Would the new wellbores be J-05BL1 and J-056L2?
Thanks,
Sean
«J-05BL1nL2.jpg»
Sean McLaughlin
CTD Engineer
564-4387 Office
223-6784 Cell
10/20/2008
TREE- i-116' CIN
INELLHEAd- I.IGEdOY
ACTUATOR- OTI~
KB. ELF - 65,3'
B F. ELeJ - 38.25'
lQOP - 31 D7'
utax A ~ gle - 93 ~ 10119'
dadm I1Id- NA
dad m N d - 880Q SS
'~ ~ ~ ~ SAFtfIF NQTES: NOTE: ORIGINALUUELLBORE
NOT SHO'llUN. 7"S~CA6 LNR HUNG OFF
F'rapa~ar~ t~:TC? r,, .41~~.-~iOrl and L~~ter~l gvIB~GENOYSUFS.
130' c7o Nd Ucla R H 5~
13-,316' CSG,6$ip, D - 1Z.i15' 2151'
I
Id- 17F55' f 17 .563 ~,
I~linimurrr ID =
7' TIER I(26ip, L~ BTd-LI, .QiB,~ bpY, Id- 6.2E
POF
19.5+x' E~S'J I
I L-30, D -8'1681'
~ 5900' ~
3
1
2Qg6" HPB R, Id-? I
2151' 13-3r6' ~49~I8' ?~Q. ID- 8.681'
2~]' i-iJ2' HeSX NP,Id-3,813
CAS GAS LFT~AA.NdRELS
5790' H9-6~6' 7C 7' B KR MCP TEB K P 14R, D - 6,313'
5802 9-516' X7' BICR~CP LTP, Id- 7.SQ
581 9-6r6'SC7' 9KRHI,IG HGR, D-6,313
IAILLOUTW NDODU (J-0S E~ S9S6'-5967'
~ 978 i-117 Hey X NIP, D - 3,813
~ 7' x i-1l~' B14i S,3 PI4R, Id- 3875'
' i-11`2" HE9 X NIP, D -3,313
'fi=t~i P TI i L T-.+114'
3' 1r11I HE` XN NP, Id- mlkd b 3.8a'
,r .... .- , ~.,. , ,. , ...~..'.., .. ~,..- ~
17' LNR, 26ip, L-80, BTG-I~ D383Dpt, D -6276• ~ 995
B ~GUrrerlt opanhOle ~
compleltion~
Ope ~ la p TD '1191?3
I
i-118'0 e~lal! TCI I
p 12Cr25
. ~
t 9 I-'li-1r"l WLBG.Id- 3958•
EL~Ad TT NQT LOGGEd
CL1
3.3fi' Ope r Y ale b TD 1 1~'
BATE ReU 8Y COIAA~ENTS BATE RE1f 8Y C171~~AENTS
07!46 ~ t iDRIG IN,4 L C4M PL ETIDN 7f5J~m7 SUUCISV SET PXN PLUG ~3f16r07)
03 ~13l0 4 T'~1-A S IDET RACK C4M RL ETION 081'2207 CA~IPJG 7' T1EI3 ICCO R R~'TD NS
0711SA3 CLId1TLP lC9 ELBdATDN,IaAXANGLE d71221Q8 JRS~Ib11 ReSETPXNPLUG ~i'A6A$)
03r10A7 CJNIPAG GLV CA
n:~n:vm~ lx I Hra.r. ra: ~ l 7n rn RR A-:-rn w~
PR UdHO E BAY U Nlf
IN EL L: J-05~= & CL1
P ERLIIT hb:
A P I ND: SO-029-~ 120-a3 ~ U5
SBG9,T11 N, R13~650' SNL & 1245' UIJEL
F~ Flnlnrntlnn f~la~ Nat
]-05B (PTD #2000180) Classified as Problem Well
.
All,
Well J-058 (PTD #2000180) has been found to have sustained casing pressure on the IA. The TIO
pressures were 1980/2010/0 psi on 03/03/07 and the well failed a TIFL on 03/06/07.
The plan forward for this well is as follows:
1. S: DGLVs
2.0: Re-TIFL
SCANNED MAR 09 2007
A well bore schematic has been included for reference.
«J-058.pdf»
The well has been classified as a Problem well. Please call if you have any questions.
Thank you,
Andrea Hughes
Well Integrity Coordinator
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
Content-Description: J -05B.pdf
Content-Type: application/octet-stream
Content-Encoding: base64
1 of 1
3/9/2007 9:31 AM
TREE = 4-1/8" CA MERON
WELLHEAD =
.
J-05B
Minimum 10 :::: 3.725" @ 9823'
4-1/2" HES XN NIPPLE
5802'
TOP OF WHIPSTOCK I 5900'
I 9-5/8" EZSV I
COMMENTS
¡ SA+TES:
2151' -113-3/8" X 9-5/8" XO I
2218'
GAS LIFT I\!1ANDRELS
DATE
MllLOUT WINDOW - 5956' - 5987'
11315' H OPEN HOLETD I
PRUDHOE BA Y UNIT
WELL:' J-'05ß
PERMIT No:'?2Ó00180
API No:' 5Ô-029-20120-02
SEC 9, T11 N, R13E: 650' SNL & 1245' WEL
BP ExPlor~ti~n (Alaska)
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
~'. '~-
", ~ ., 1""t.t.,
- .' '.:. "l'. ",... "~"'~'"
!~'.,--.. ,
' ,
\
Permit to Drill No. 2000180
MD 11315 TVD
DATA SUBMITTAL COMPLIANCE REPORT
3/21/2002
Well Name/No. PRUDHOE BAY UNIT J-05B Operator BP EXPLORATION (ALASKA) [NC
8686 Completion Date 3/14/2000'~/ Completion Status 1-OIL Current Status
AP1 No.
1-OIL
50-029-20120-02-00
UIC N
REQUIRED INFORMATION
Mud Log No Samples No
-- --
Directional Survey No
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Format
~LIS Verification
M
D ROP/GR/RES
~ TVD GR/RES
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run Interval OH /
Scale Media No Start Stop CH
Dataset
Received Number Comments
FINAL
25 FINAL 5956 11315
25 FINAL 5456 8687
CH
C
oh
oh
2/27/2001 LIS Verification Paper Copy
2/27/2001 Q9916 """~5951-11261
3/16/2001 BL, Sepia
3/16/2001 BL, Sepia
Well Cores/Samples Information:
Name
Start
Interval
Stop
Sent Received
Dataset
Number Comments
ADDITIONAL INFORMATION
Well Cored? Y/~)
Chips Received? ~Y~N--
Analysis Received? ~
Daily History Received? (~ / N
Formation Tops Receuived? ~,~ N
Comments:
Compliance Reviewed By:
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
March 14, 2001
MWD Formation Evaluation Logs · J-05B,
AK-MM-90254
J-05B: O~~ O ~ g
2" x 5" MD Resistivity & Gamma Ray Logs ·
50-029-20120-02
2" x 5" TVD Resistivity & Gamma Ray Logs ·
50-029-20120-02
1 Blueline
1 Rolled Sepia
1 Blueline
1 Rolled Sepia
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
THE
RECEIVED
Date:
Alaska Oil & Gas Cons, Commission
Anchorage
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7a Avenue, Suite 100
Anchorage, Alaska
February 23, 2001
RE: MWD Formation Evaluation Logs J-05B, AK-MW-90254
1 LDWG formatted Disc with verification listing.
AP1//: 50-029-20120-02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date'~l
'2Ooo
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO' Julie Heusser,
Commissioner
DATE:
November 12, 2000
THRU-
Blair Wondzell,
P. I. Supervisor ~,
.-..-¢/
FROM: John Crisp, J~,,, ~, SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Unit
J Pad
Nov..ember 127 2000: I traveled to BP's Prudhoe Bay Field J Pad to witness
Safety Valve System tests.
Safety Valve tests had been d~elaye_d for 2 days due to blowing snow Phase 3
weather conditions. I met with BP rep. Merv Littlelow & discussed SVS tests on J
Pad. Merv & I decided that we could safely test valves as soon as Roads & Pads
could clean a path to well houses & skid 52. Well houses had fair amount of
snow inside the houses due to the extended blow. Testing was conducted in as
safe & efficient manner as conditions would allow. The AOGCC test report is
attached for reference.
SUMMARY: I witnessed SVS tests on PBU J Pad.
8 wells, 16 components tested. No failures witnessed.
8 Well houses inspected.
Attachments: SVS PBU J Pad 11-12-00jc
cc;
NON-CONFIDENTIAL
Alaska Oil and Gas ConserVation Commission
Safety Valve System TeSt Report
Operator: BPX _
Operator ReP: Merv Littlelow
AOGCC Rep: John Crisp
Submitted By: John Crisp Date:
Field/Unit/Pad: Prudhoe Bay Field J Pad
Separator psi: LPS 149 HPS
11/12/00
687
Well permit Separ Set L/P Test Test Test Date
oil, WAC, CI~J,
Number Number PSI PSI Trip Code Code Code Passed CAS or CYCLe
J-01A 1941110 687 550 540 P P OIL
J-02A 1690970 687 550 550 P P OIL
J-03 1690450
J-06 1770200
J-07A 1960870
J-08 1770470
J-09A 1940990
,,
J-10 1800160
J-11A 1961040
,
J-12 1800170
J-13 1800830
J-14 1830750
J-15A 1981750
J-16 1830880
J-17A 1990920 149! 125 125 P P OIL
J-18 1831080 687! 550 525 P P OIL
J-19 1861350
J-20A 1961060
J-21 1870240
J-22 1870170
J-23 1870310
J-24 1870020
J-25 1870680
J-26 1870590
J-27 1870580 687! 550 550 P P OIL
J-28 1870410 687~ 550 525 P P OIL
JX-02A 1941540 149! 125 125 P P OIL
J-05B 2000180 687 550 400 P P OIL
.
Wells: 8 Components: 16 Failures: 0 Failure Rate: 0.0% [-] 90 my
Remarks:
11/16/00 Page 1 of 2 SVS PBU J Pad 11-12-00jc.xls
-, STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil . [] Gas [] Suspended [] Abandoned [] Service
,.
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 200-018
3. Address 8. APl Number
P.O. Box 196612, AnchOrage, Alaska 99519-6612 50-029-20120-02
4. Location of well ,at surfaCe /':~)¢-J~' .'~i~ Unit
~.~:!~! 9. or Lease Name
650' SNL, 1245 WEL, SEC. 09, T11N, R13E, UM T'7;;::ii~;';:::-::'::'i, ~I Prudhoe Bay Unit
At top of productive interval ~ ..... i i~.~~I~ ~'"":! i~ I~; ' ': '~
2660 NSL, 408 EWL, SEC. 03, T11N, R13E, UM ~ "~-.,~::,;,'/ .~..
At total depth,. ~~_~. i -'-'7~' ~/~'/-~ eii~-~~ "'-'~- -' ~ 11°' Well Number1. Field and Pool
3121' NSL, 1565' EWL, SEC. 03, T11N, R13E, UM! ~~ i ' J-05B
5. Elevation in feet (indicate KB, DF, etc.) 6. LeasbDesigna~ienand S
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 65.84' ADL 028281
1'2. Date Spudded2/28/2000 113' Date T'D' Reached 114' Date C°mp" Susp" °r Abandl 115' Water depth' if °ffsh°re 116' No' °f Completions3/11/2000 3/14/2000 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
11315 8686 FTI 11315 8686 FTI []Yes •NoI (Nipple) 2218' MDI 1900'(Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES,
2'3. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" x 30" Surface 118'
18-5/8" 96.5# / 109# K-55 Surface 2553' 4629 sx PF II
13-3/8" x 68# N-80 Surface 5956' 17-1/2" 1550 sx Class 'G'~ 575 sx PF II
9-5/8"
7" 26# L-80 28' 9985' 8-1/2" 160 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
(8-1/2" Open Hole) 4-1/2", 12.6#, L-80 9835' 9778'
MD TVD MD TVD
9985' - 11315' 8654' - 8686' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 94 Bbls of Diesel
'~7. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
April 7, 2000 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY'API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cor~ chiDs.
'0 R iGINA L 2000
Alaska Oil &
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Top HRZ 7891' 7006'
Base HRZ 8178' 7239'
LCU 8294 7332'
Top Sag River 9974' 8649'
0 3 2000
Anch0r~e
31. List of A~achments: Summaw of Daily Drilling Repo~s, Su~eys
32. I hereby ce~i~ that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble ~m~ ~ Title Technical Assistant ,,, Date ~'O~'m
J-05B 200-018 Prepared By Name/Numbec Terrie Hubble. 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL; This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23; Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
PB J Pad
Progress Report
Well J-05B Page 1
Rig Nabors 7ES Date 20 March 00
Date/Time
18 Feb 00
19 Feb 00
20 Feb 00
14:00-23:30
14:00-18:00
18:00
18:00-23:30
23:30
23:30-06:00
23:30-06:00
06:00-09:00
06:00-09:00
09:00
09:00-13:30
09:00-13:30
13:30
13:30-06:00
13:30-19:30
19:30
19:30-05:00
05:00
05:00-06:00
05:00-06:00
06:00-12:30
06:00-12:30
12:30
12:30-18:00
12:30-13:00
13:00
13:00-14:00
Duration
9-1/2 hr
4 hr
5-1/2 hr
6-1/2 hr
6-1/2 hr
3 hr
3 hr
4-1/2 hr
4-1/2 hr
16-1/2 hr
6hr
9-1/2 hr
1 hr
1 hr
6-1/2 hr
6-1/2 hr
5-1/2 hr
1/2 hr
1 hr
Activity
Move rig
Rigged down Drillfloor / Derrick
R/D rig floor. Installed bridal lines. L/D
derrick. Secured lines.
Equipment work completed
Rig moved 33.00 %
Moved camp and pit module to J pad. Moving sub
structure 4 miles down ice road when hydraulic drive
motor failed. Weather phase 1 and phase 2.
High pressure lines failed - Abort operation
Repair
Repaired High pressure lines
Replace hydraulic motor on moving system.
Move rig
Rig moved 50.00 %
Finished move rig off W. Gwydyr 4/1 ice road.
Stopped due to weather: Whiteout / Phase 2
Suspend operations
Rig waited: Whiteout/Phase 2
Waited on AIC blade and blower to get around rig,
needed to fuel up. Checked lug bolts on wheels,
checked moving system. Worked issues with WOA
security. Obtained clearance to move rig.
Resumed operations
Move rig
Rig moved 95.00 %
Moved substructure from S pad to J pad.
At well location - Cellar
Rig moved 100.00 %
Clear snow and set matting boards and herculite.
Spot sub over well. Set mats and herculite, spot
pits. Spot camp and shop. Finish berming under rig.
At well location - Cellar
Rigged up Drillfloor / Derrick
R/U lines, prepare to raise derrick.
Rigged up Drillfloor / Derrick
Raised derrick. Pinned pipe chute. Unpin and hang
bridal lines. Hooked up top drive to blocks. Rig
up on rig floor. Put fluid in pits.
Move rig (cont...)
Rigged up Drillfloor / Derrick (cont...)
Raised derrick. Pinned pipe chute. Unpin and hang
bridal lines. Hooked up top drive to blocks. Rig
up on rig floor. Put fluid in pits.
Equipment work completed
Wellhead work
Held safety meeting
Held Pre-spud safety meeting with crew. Reivewed
pre-spud checklist, Methanol MSDS, safety and
environmental comitment, reviewed well plan.
Completed operations
Rig accepted at 1230 hrs 2/20/00.
Removed Hanger plug
R/U DSM lubricator and pulled BPV.
Facility PB J Pad
Date/Time
14:00
14:00-15:00
15:00
15:00-18:00
18:00
18:00-03:00
18:00-21:00
21:00
21:00-00:00
21 Feb00 00:00
00:00-03:00
03:00
03:00-06:00
03:00-06:00
03:00-06:00
06:00-09:30
06:00-09:30
09:30
09:30-12:30
09:30-12:30
12:30
12:30-17:30
12:30-17:30
17:30
17:30-21:30
17:30-18:00
Progress Report
Well J-05B Page 2
Rig Nabors 7ES Date 20 March 00
Duration
1 hr
3 hr
9 hr
3 hr
3 hr
3 hr
3 hr
3hr
3 hr
3-1/2 hr
3-1/2 hr
3 hr
3 hr
5 hr
5 hr
4 hr
1/2 hr
Activity
Equipment work completed
Installed Hanger plug
Installed TWC. Tested from below to 1000 psi.
Eqpt. work completed, running tool retrieved
Removed Xmas tree
N/D tree and adapter. Hanger threads look OK.
Equipment work completed
Nipple up BOP stack
Rigged up BOP stack
Installed secondary annular valve and N/U BOP's.
Installed mouse hole, drilling nipple to short.
Equipment work completed
Rigged up High pressure lines
R/U to circulate methanol freeze protect to
cuttings tank, by passing pits.
Equipment work completed
Installed Bell nipple
Weld extension on bell nipple. Install and secure.
Equipment work completed
Test well control equipment
Tested BOP stack
Screwed in test it. Filled stack. Fluid leaking
by TWC. Pulled test jt and ran xo and jt DP.
Screwed into hanger threads. Test annulus to 1000 psi,
held. Pressure on top TWC @ report time.
Tested BOP stack
Got TWC to hold. L/D jt drill pipe and M/U test
jt. Tested top pipe rams, blind rams, Hydril, floor
safety valves, choke and kill line valves to
250/3500 psi. Performed accumulator test. Witness of
test waived by J. Crisp AOGCC.
Test well control equipment (cont...)
Tested BOP stack (cont...)
Got TWC to hold. L/D jt drill pipe and M/U test
jt. Tested top pipe rams, blind rams, Hydril, floor
safety valves, choke and kill line valves to
250/3500 psi. Performed accumulator test. Witness of
test waived by J. Crisp AOGCC.
Pressure test completed successfully - 3500.000 psi
Nipple up Top ram
Rigged up Top ram
Installed 7" pipe rams. Test doors to 3500 psi.
(had trouble with TWC holding)
Equipment work completed
Wellhead work
Removed Hanger plug
R/U DSM and attempted to pull TWC. Could not catch
due to debris on top of plug. Pulled lubricator.
Drained stack. Attempt to remove junk with cellar
pump. P/U jt of drill pipe and washed on top of
plug, 13 BPM. P/U lubricator and pulled TWC.
Equipment work completed
Fluid system
Held safety meeting
IIUIU I JOl¥1 glllU U13L.,L133 L~III,,,LIIglLIII[ IIlCLIIO. IIUI
Facility
PB J Pad
Progress Report
Well J-05B Page 3
Rig Nabors 7ES Date 20 March 00
Date/Time
18:00
18:00-21:30
21:30
21:30-05:00
21:30-23:00
23:00
23:00-00:00
22 Feb 00 00:00
00:00-02:00
02:00
02:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00
06:00-14:00
06:00-13:00
13:00
13:00-14:00
14:00
14:00-16:30
14:00-15:00
15:00
15:00-16:30
16:30
16:30-22:00
16:30-17:00
17:00
17:00-18:00
18:00
18:00-19:30
Duration
3-1/2 hr
7-1/2 hr
1-1/2 hr
1 hr
2 hr
3 hr
1 hr
1 hr
8 hr
7 hr
1 hr
2-1/2 hr
1 hr
1-1/2 hr
5-1/2 hr
1/2 hr
1 hr
1-1/2 hr
Activity protect to cuttings tank.
Completed operations
Circulated at 6325.0 ft
Circulate MeOH from well.
Hole displaced with Seawater - 100.00 % displaced
Pull Gas lift completion, 7in O.D.
Pulled Tubing on retrieval string to 0.0 ft
Attempt to make-up landing jr. Got 5 turns,
expected 6. Wash threads, same result. Threads
beginning to gall. Decision made to use spear.
Stopped: To change handling equipment
Rigged up Tubing handling equipment
R/U Halliburton control line spooling equip. R/U
csg tongs and handling equipment.
Work completed - Tubing handling equipment in position
Pulled Tubing on retrieval string to 30.0 ft
M/U Baker spear and pulled tubing hanger to rig
floor. L/D spear.
Fish at surface
Laid down 900.0 ft of Tubing
L/D hanger and made up control line to spooling
unit. L/D 7" tubing. Pulled free @ 275K, up wt
175K.
Began precautionary measures
Repair
Repaired Tubing handling equipment
Fan belt on Halliburton truck that power spooling
unit failed.
Equipment work completed
Changed out truck.
Pull Single completion, 7in O.D.
Laid down 6325.0 ft of Tubing
POH and L/D 157jts 7" tbg, ball valve, 19.80' cut
it. Recovered 80 SS bands.
157 joints laid out
Rigged down Tubing handling equipment
Equipment work completed
Nipple up Top ram
Rigged up Top ram
Installed 3-1/2" x 6" VBR top rams.
Equipment work completed
Tested Pipe ram
Installed test plug and tested upper and lower pipe
rams to 250/3500 psi. Pulled plug and installed
wear bushing.
Pressure test completed successfully - 3500.000 psi
5in. Drillpipe workstring run
Laid down 50.0 ft of 5in OD drill pipe
L/D spear assembly.
At Surface: 0.0 ft
Ran Drill collar to 101.0 ft (6-1/2in OD)
P/U window mills and jt HWDP. PFLI drill collars to
101', hit obstruction.
Unable to re-enter hole
Worked toolstring at 101.0 ft
nttClllJJt tO wol-~ utJ3tl uetlu,,.
llllllh llllU
Facility
PB J Pad
Progress Report
Well J-05B Page 4
Rig Nabors 7ES Date 20 March 00
Date/Time
19:30
19:30-21:30
23 Feb 00
21:30
21:30-22:00
22:00
22:00-04:30
22:00-00:00
00:00
00:00-04:00
04:00
04:00-04:30
04:30
04:30-06:00
04:30-06:00
06:00-02:00
06:00-08:30
08:30
08:30-12:00
12:00
12:00-19:00
19:00
19:00-20:00
20:00
20:00-22:00
22:00
22:00-02:00
24 Feb 00 02:00
02:00-04:00
02:00-04:00
Duration
2 hr
1/2 hr
6-1/2 hr
2 hr
4 hr
1/2 hr
1-1/2 hr
1-1/2 hr
20 hr
2-1/2 hr
3-1/2 hr
7 hr
1 hr
2 hr
4 hr
2 hr
2 hr
Activity L/D starting mill. 8" string mill would not go.
Completed operations
Ran Drill collar to 90.0 ft (6-1/2in OD)
P/U drill collars and HWDP and stand back in
derrick.
Began precautionary measures
Serviced Top drive
Equipment work completed
Slickline wireline work
Rigged up Slickline unit
R/U HES slickline.
Equipment work completed
R -qCEIVED
',,*, 0 3 2000
Gas Cons. Commissi~
~c~0r~e
Conducted slickline operations on Slickline equipment - Tool run
Ran X-Y caliper log from 6225' to surface.
Completed run with XY caliper from 6225.0 ft to 0.0 ft
Rigged down Slickline unit
Equipment work completed
5in. Drillpipe workstring run
Singled in drill pipe to 90.0 ft
P/U drill pipe while printing caliper log.
5in. Drillpipe workstring run
Ran Drill collar to 177.0 ft (6-1/2in OD)
P/U 7.75" swedge, bumper jars, oil jars, (5) DC.
Swedged thru tight spot f/101' to 117'. Finished
run to 177'. POH f/ 8.0" swedge.
Stopped: To pick up/lay out tubulars
Ran HWDP in stands to 558.0 ft
RIH 18 jts HWDP. P/U 8" swedge. Run on B.Sub,
OilJars, (5) 6-1/2" DC. Swedge f/101' to 117'. Run
swedge to 177'. POH.
At Surface · 0.0 ft
Ran Drill collar in stands to 177.0 ft
Changeout swedge to 8.25". RIH and swedged f/101'
to 106'. Circulating 90 deg seawater while
swedging. Swedge stopped at 106', no further progress.
Observed 58.00 klb resistance
Would not go down. Decide to get bigger DC's.
Laid down 155.0 ft of Drill collar
L/D 6-1/2" DC's.
5 joints laid out
Ran Drill collar to 90.0 ft (8in OD)
P/U (3) 8"DC's and stand back. P/U (2) 8" DC's and
RIH. (18) HWDP, 8.25" swedge, B. Jars, Oil Jars,
(5) 8" DC.
Observed 68.00 klb resistance
Ran Drill collar in stands to 102.0 ft
Swedging with 8.25" swedge while circulating 135deg
seawater. Tagged up @ 101', unable to swedge past
102'. (Appears swedged interval closed up while
changing drill collars).
Completed run with Subs to 102.0 ft
Swedging with max weight uneffective.
Planned maintenance
Serviced Block line
Facility
PB J Pad
Progress Report
Well J-05B Page 5
Rig Nabors 7ES Date 20 March 00
Date/Time
04:00
04:00-06:00
04:00-06:00
06:00-10:00
06:00-06:30
06:30
06:30-07:00
07:00
07:00-08:30
08:30
08:30-10:00
10:00
10:00-11:00
10:00-11:00
11:00
11:00-12:30
11:00-12:00
12:00
12:00-12:30
12:30
12:30-14:00
12:30-14:00
14:00
14:00-15:30
14:00-15:30
15:30
15:30-18:30
15:30-18:00
18:00
18:00-18:30
18:30
18:30-20:30
18:30-20:30
20:30
20:30-06:00
20:30-22:00
22:00
Duration
2 hr
2 hr
4 hr
1/2 hr
1/2 hr
1,1/2 hr
1-1/2 hr
1 hr
1 hr
1-1/2 hr
1 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
3 hr
2-1/2 hr
1/2 hr
2 hr
2 hr
9-1/2 hr
1-1/2 hr
Activity drawworks, and crown for damage from jarring.
Equipment work completed
5in. Drillpipe workstring run
Ran Drillpipe in stands to 2050.0 ft
MFU 7 3/4" swedge and 6-1/2" DC's. 7-3/4" swedge,
B. sub, Oil Jars, (9) DC's, (18) HWDP.
5in. Drillpipe workstring run (cont...)
Ran Drillpipe in stands to 2050.0 ft (cont...)
M/U 7 3/4" swedge and 6-1/2" DC's. 7-3/4" swedge,
B. sub, Oil Jars, (9) DC's, (18) HWDP.
On bottom
Finished check trip.
Pulled Drillpipe in stands to 1450.0 ft
Stopped: To circulate
Circulated at 1450.0 ft
Circulate clean seawater.
Hole displaced with Seawater - 200.00 % displaced
Pulled out of hole to 0.0 ft
POH. L/D swedge and jars.
At Surface: 0.0 ft
Wellhead work
Removed Wear bushing
Pulled wear bushing. Cleared floor.
Equipment work completed
5in. Packer assembly workstring run
Ran HWDP in stands to 558.0 ft
Stopped: At sub-assembly
Rigged up sub-surface equipment - Retrievable packer
PFU HES RTTS and set at 35'.
Work completed - Retrievable packer in position
Nipple down BOP stack
Removed BOP stack
Pull drilling nipple and mousehole. N/D BOP's.
Equipment work completed
Wellhead work
Rigged down Tubing head spool
N/D tubing spool. Weld slips to 9-5/8" casing.
Equipment work completed
Nipple up BOP stack
Rigged up BOP stack
NFU 13-5/8" drilling spool and BOP's. Installed
mousehole and drilling nipple.
Equipment work completed
Tested BOP stack
Press test on top of RTTS to 1000 psi, OK.
Pressure test completed successfully - 1000.000 psi
5in. Packer assembly workstring run
Pulled HWDP in stands to 0.0 ft
Retrieved RTTS. POH and stand back HWDP.
Completed operations
Pull Casing, 9-5/8in O.D.
Pulled Casing on retrieval string to 2032.0 ft
Speared 9-5/8" casing and pulled to rig floor.
(300K, pumped out)
Stopped: To circulate
Facility
PB J Pad
Progress Report
Well J-05B Page 6
Rig Nabors 7ES Date 20 March 00
Date/Time
25 Feb 00
26 Feb 00
22:00-06:00
22:00-06:00
06:00-03:30
06:00-10:00
10:00
10:00-10:30
10:30
10:30-17:00
17:00
17:00-17:30
17:30
17:30-01:00
01:00
01:00-03:30
03:30
03:30-05:00
03:30-05:00
05:00
05:00-05:30
05:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-06:30
06:00-06:30
Duration
8 hr
8 hr
21-1/2 hr
4 hr
1/2 hr
6-1/2 hr
1/2 hr
7-1/2 hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2hr
1/2 hr
1/2 hr
1/2 hr
Activity
Circulated at 2032.0 ft
Circ out Arctic Pack to point of diminishing
returns. R/U casing handling equipment while
circulating.
Circulated at 2032.0 ft
Circulate Artic Pac out 13-3/8" annulus. Artic Pac
coming out in globs. Have to shutdown between
circulations, due to seawater channeling. Lost down
weight due to Artic Pac below csg. Circ out so slips
will work.
Pull Casing, 9-5/8in O.D. (cont...)
Circulated at 2032.0 ft (cont...)
Circulate Artic Pac out 13-3/8" annulus. Artic Pac
coming out in globs. Have to shutdown between
circulations, due to seawater channeling. Lost down
weight due to Artic Pac below csg. Circ out so slips
will work.
Stopped · To hold safety meeting
Held safety meeting
Held safety and environmental meeting on laying
down thermocasing.
Completed operations
Laid down 130.0 ft of Casing
L/D 3 jts 11-3/4"x 9-5/8" casing. Had to spear
each joint, screw in xo with shackles. Middle jt
partially collapsed, inner and outer strings.
Stopped · To circulate
Circulated at 1900.0 ft
Circulate while changing handling equipment, not
recovering much additional artic pac.
Stopped · To pick up/lay out tubulars
Laid down 1880.0 ft of Casing
1781' 10-3/4" casing plus 9-5/8" casing and PBR
seal assembly. Jts extremely hard to break, coated
with Arctic Pack.
51 joints laid out
Rigged down Casing handling equipment
L/D casing handling tools. Cleaned rig floor. L/D
spear.
Equipment work completed
Test well control equipment
Tested BOP stack
Installed test plug in casing head and tested all
flanges above to 3500 psi. Pulled test plug.
Pressure test completed successfully - 3500.000 psi
Planned maintenance
Serviced Top drive
Equipment work completed
Perform integrity test
Tested Casing
Tested 13-3/8"csg, 9-5/8" csg and cement plug to
2500 psi, 30 min. No leak off.
Perform integrity test (cont...)
Tested Casing (cont...)
Facility
Date/Time
27 Feb 00
PB J Pad
Progress Report
Well J-05B Page 7
Rig Nabors 7ES Date 20 March 00
06:30
06:30-07:00
06:30-07:00
07:00
07:00-08:00
07:00-08:00
08:00
08:00-14:30
08:00-09:30
09:30
09:30-10:00
10:00
10:00-12:00
12:00
12:00-13:00
13:00
13:00-14:30
14:30
14:30-02:30
14:30-15:30
15:30
15:30-21:30
21:30
21:30-22:30
22:30
22:30-01:30
01:30
01:30-02:30
02:30
02:30~06:00
02:30-03:00
03:00
03:00-03:30
03:30
03:30-06:00
06:00
06:00-05:00
06:00-07:30
07:30
07:30~13:30
13:30
Duration
1/2 hr
1/2 hr
1 hr
1 hr
6-1/2 hr
1-1/2 hr
1/2 hr
2 hr
! hr
1-1/2 hr
12hr
1 hr
6 hr
1 hr
3 hr
1 hr
3-1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
23 hr
1-1/2 hr
6 hr
Activity 2500 psi, 30 min. No leak off.
Pressure test completed successfully - 2500.000 psi
Wellhead work
Installed Wear bushing
Eqpt. work completed, running tool retrieved
Planned maintenance
Serviced Top drive
Change out saver sub, dies, adjust grabber.
Equipment work completed
BHA run no. 1
Made up BHA no. 1
BHA no. 1 made up
Circulated at 860.0 ft
BHA taking weight. Stopped and circ out Artic
Pack scrapings.
Obtained clean returns ~ 100.00 % hole volume
Singled in drill pipe to 2046.0 ft
Lightly tagged inside PBR. P/U and circ.
Stopped: To circulate
Circulated at 2030.0 ft
Circ out Arctic Pack scrapings.
Hole swept with slug - 150.00 % hole volume
Pulled out of hole to 0.0 ft
POH. L/D bit and scraper.
At Surface: 0.0 ft
BHA run no. 2
Made up BHA no. 2
P/U window mills and RIH.
BHA no. 2 made up
Singled in drill pipe to 6100.0 ft
No obstructions.
166 joints picked up
Circulated at 6100.0 ft
Hole swept with slug - 150.00 % hole volume
Pulled out of hole to 895.0 ft
At BHA
Pulled BHA
L/D jars and mills.
BHA Stood back
Electric wireline work
Held safety meeting
Completed operations
Rigged up Logging/braided cable equipment
Equipment work completed
Conducted electric cable operations
RIH w/HES 9-5/8" EZSV and set in sand below casing
collar at 5982' WLM.
Completed run with Bridge plug from 0.0 ft to 6050.0 ft
BHA run no. 3
Made up BHA no. 3
Bottom trip whipstock and window mills. Orient
MWD.
BHA no. 3 made up
R.I.H. to 5940.0 ft
Stopped: To take survey
~ior~
Facility PB J Pad
Progress Report
Well J-05B Page 8
Rig Nabors 7ES Date 20 March 00
Date/Time
13:30-15:00
15:00
15:00-17:00
17:00
17:00-23:00
23:00
23:00-00:30
28 Feb 00 00:30
00:30-02:00
02:00
02:00-02:30
02:30
02:30-03:00
03:00
03:00-05:00
05:00
05:00-06:00
05:00-05:30
05:30
05:30-06:00
06:00-06:30
06:00-06:30
06:30
06:30-09:30
06:30-09:00
09:00
09:00-09:30
09:30
09:30-06:00
09:30-11:30
11:30
11:30-13:30
13:30
13:30-15:00
15:00
15:00-15:30
15:30
Duration
1-1/2 hr
2 hr
6 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
2 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
3 hr
2-1/2 hr
20-1/2 hr
2 hr
2 hr
1-1/2 hr
1/2 hr
Activity
Took MWD survey at 5940.0 ft
Orient and slack off to set whipstock 79 deg left
high side. Bridge plug at 5986' DPM.
Acceptable survey obtained at 5940.0 ft
Circulated at 5956.0 ft
Change over mud system to 10.2 ppg milling fluid.
Hole displaced with Water based mud - 100.00 % displaced
Milled Casing at 5987.0 ft
Top of window at 5956'. Milled to 5987'.
Completed operations
Circulated at 5987.0 ft
Circ hi-lo visc sweep until cleaned up. Recovered
total 248# metal.
Obtained clean returns - 150.00 % hole volume
Pulled out of hole to 2050.0 ft
Stopped: To circulate
Circulated at 2050.0 ft
Pumped lo-hi visc sweep. No additional metal
recovered.
Obtained clean returns - 150.00 % hole volume
Pulled out of hole to 904.0 ft
At BHA
Pulled BHA
Stand back HWDP, L/D DC's and mills.
BHA Laid out
Wellhead work
Jet wellhead
Completed operations
Removed Wear bushing
Removed wear bushing and installed test plug.
Wellhead work (cont...)
Removed Wear bushing (cont...)
Removed wear bushing and installed test plug.
Equipment work completed
Test well control equipment
Tested BOP stack
Tested pipe rams, blind rams, choke and kill line
valves, floor safety valves, hydril to 250/3500 psi.
Tested accumulator. Witness of test waived by L.
Grimaldi AOGCC.
Pressure test completed successfully - 3500.000 psi
Installed Wear bushing
Set wear bushing and RILDS.
Eqpt. work completed, running tool retrieved
BHA run no. 4
Made up BHA no. 4
BHA no. 4 made up
Singled in drill pipe to 2604.0 ft
P/U 5" drill pipe.
60 joints picked up
R.I.H. to 5907.0 ft
Stopped: To take survey
Set tool face
Completed operations
Facility
PB J Pad
Progress Report
Well J-05B Page 9
Rig Nabors 7ES Date 20 March 00
Date/Time
29 Feb 00
O1 Mar O0
02 Mar O0
15:30-16:00
16:00
16:00-06:00
16:00-06:00
06:00-06:00
06:00-03:00
03:00
03:00-04:00
04:00
04:00-05:00
05:00
05:00-06:00
06:00
06:00-06:00
06:00-07:00
07:00
07:00-06:00
07:00-06:00
06:00-09:00
06:00-09:00
09:00
09:00-10:00
09:00-10:00
10:00
10:00-21:30
10:00-14:30
14:30
14:30-15:30
15:30
15:30-20:00
20:00
20:00-21:30
21:30
21:30-06:00
Duration
1/2 hr
14hr
14hr
24 hr
21hr
1 hr
1 hr
1 hr
24 hr
1 hr
23 hr
23 hr
3 hr
3 hr
1 hr
1 hr
11-1/2 hr
4-1/2 hr
1 hr
4-1/2 hr
1-1/2 hr
8-1/2 hr
Activity
Reamed to 5987.0 ft
Slide to 5975'. Reamed to 5987'. No problems with
window.
On bottom
Drilled to 6429.0 ft
D2 Drill-OS- 1:10 min.
Drilled to 6429.0 ft
Sliding f/5987' to 6429'. AST=I 1.25 hrs. ART=0
BHA run no. 4 (cont...)
Drilled to 7703.0 ft (cont...)
Sliding f/5987' to 6429'. AST=I 1.25 hrs. ART=0
Started scheduled wiper trip: due to Footage drilled
Circulated at 7703.0 ft
Pump weighted Hi-Vis sweep.
Hole swept with slug - 120.00 % hole volume
Pulled out of hole to 5907.0 ft
Monitor well-OK. POH with no problems.
At 9-5/8in casing shoe
Serviced Top drive
Equipment work completed
BHA run no. 4 (cont...)
R.I.H. to 7703.0 ft
Precautionary ream last stand. No fill-No problems.
On bottom
Drilled to 9040.0 ft
Fire Drill-OS-1 min; D1 Drill-OS-1 min.
Drilled to 9040.0 ft
Started increasing mud wt to 11.4# @ -9250'.
BHA run no. 4 (cont...)
Drilled to 9329.0 ft (cont...)
Started increasing mud wt to 11.4# @ -9250'.
Pistons failed - Circulate
Repair
Repaired Pistons
Replace swab in #1 MP. Continued to raise mud wt
while working on pump.
Equipment work completed
BHA run no. 4
Drilled to 9443.0 ft
Bit slowed down markedly during the last 15'. Pump
pressure increased -700 psi.
ROP dropped from 50.0 fl/hr to 5.0 ft/hr - Bit quit
Circulated at 9443.0 ft
Circ. Monitor' well. Pump dry job. Blow down.
Heavy slug spotted downhole
Pulled out of hole to 720.0 ft
Pulled out good. Hole slick. D1 Drill-OS-1 min.
At BHA
Pulled BHA
LD MWD & motor. Bit had 2 pieces of stator rubber
plugging 2 nozzles. Gauge cutters pretty well
hammered. Clear floor.
BHA Stood back
BHA run no. 5
Facility
Date/Time
03 Mar 00
04 Mar O0
PB J Pad
Progress Report
Well J-05B Page 10
Rig Nabors 7ES Date 20 March 00
21:30-01:00
01:00
01:00-02:30
02:30
02:30-03:30
03:30
03:30-04:00
04:00
04:00-06:00
04:00-06:00
06:00-06:00
06:00-06:30
06:30
06:30-06:00
06:30-06:00
06:00-01:30
06:00-09:00
09:00
09:00-10:30
10:30
10:30-13:00
13:00
13:00-14:30
14:30
14:30-16:30
16:30
16:30-18:30
18:30
18:30-18:45
18:45
18:45-22:00
22:00
22:00-23:30
Duration
3-1/2 hr
1-1/2 hr
lhr
1/2 hr
2 hr
2 hr
24 hr
1/2 hr
23-1/2 hr
23-1/2 hr
19-1/2 hr
3 hr
1-1/2 hr
2-1/2 hr
1-1/2 hr
2 hr
2 hr
3-1/4 hr
1-1/2 hr
Activity
Made up BHA no. 5
MU bit, motor, & MWD w/GR/RES. Adjust motor to
1.15 deg. Orient. Load MWD. RIH w/DC's & HWDP.
BHA no. 5 made up
R.I.H. to 5917.0 ft
Stopped: To service drilling equipment
Serviced Block line
Slip & cut 97'.
Line slipped and cut
Serviced Top drive
Equipment work completed
R.I.H. to 9100.0 ft
Took surveys @ 6829' as per JORPS.
R.I.H. to 9100.0 ft
Precautionary ream last stand down. No fill-No
problems.
BHA run no. 5 (cont...)
R.I.H. to 9443.0 ft (cont...)
Precautionary ream last stand down. No fill-No
problems.
On bottom
Drilled to 9950.0 ft
D2 Drill-OS- 1:30 min.
Drilled to 9950.0 ft
Spill Drill-OS-1 min.
BHA run no. 5 (cont...)
Drilled to 9985.0 ft (cont...)
Spill Drill-OS-1 min.
Reached planned end of run - Geological
Circulated at 9985.0 ft
Circ Lo-Vis sweep.
Hole swept with slug - 120.00 % hole volume
Pulled out of hole to 6000.0 ft
Monitor well-OK. Short trip to shoe-wet. Hole in
good shape.
At 9-5/8in casing shoe
R.I.H. to 9985.0 ft
Monitor well. No fill-No problems.
On bottom
Circulated at 9985.0 ft
Circ Lo-Hi sweep. Spot Lubetex/Baratrol pill in
open hole. Drop rabbit.
Hole swept with slug - 150.00 % hole volume
Pulled out of hole to 7000.0 ft
Monitor well-OK. POH wet to shoe. SLM. D 1
Drill-OS- 1 min.
Stopped: To circulate
Circulated at 7000.0 ft
Monitor well-OK. Pump dry job.
Heavy slug spotted downhole
Pulled out of hole to 720.0 ft
SLM-No correction.
At BHA
Pulled BHA
LD BIIA.
Facility
Date/Time
05 Mar 00
PB J Pad
Progress Report
Well J-05B Page 11
Rig Nabors 7ES Date 20 March 00
23:30
23:30-00:30
00:30
00:30-01:30
01:30
01:30-06:00
01:30-02:30
02:30
02:30-04:00
04:00
04:00-04:30
04:30
04:30-06:00
04:30-06:00
06:00-17:00
06:00-10:00
10:00
10:00-10:30
10:30
10:30-11:00
11:00
11:00-13:00
13:00
13:00-14:00
14:00
14:00-17:00
17:00
17:00-23:00
17:00-19:30
19:30
19:30-20:00
20:00
20:00-20:45
Duration
1 hr
1 hr
4-1/2 hr
1 hr
1-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
llhr
4 hr
1/2 hr
1/2 hr
2 hr
1 hr
3 hr
6 hr
2-1/2 hr
1/2 hr
3/4 hr
Activity
BHA Laid out
Downloaded MWD tool
Completed operations
Pulled BHA
LD motor & MWD.
BHA Laid out
Run Liner, 7in O.D.
Rigged up Casing handling equipment ArK,'hor~o
RU to run 7" liner.
Equipment work completed
Serviced Draw works
Service draw works, check quick releases, adjust
brakes.
Equipment work completed
Held safety meeting
PJSM-running liner.
Completed operations
Ran Liner to 1000.0 ft (7in OD)
Start running 7" liner.
Ran Liner to 1000.0 ft (7in OD)
Ran 102 jts 7", 26#, L-80 BTC-Mod w/FS, FC, & LC
insert. MU liner hanger assembly. Spill Drill-OS
-1:30 min
Run Liner, 7in O.D. (cont...)
Ran Liner to 4160.0 ft (7in OD) (cont...)
Ran 102 jts 7", 26#, L-80 BTC-Mod w/FS, FC, & LC
insert. MU liner hanger assembly. Spill Drill-OS
-1:30 min
Stopped · To change handling equipment
Rigged down Casing handling equipment
Change elevators. RD casing tools.
Equipment work completed
Circulated at 4160.0 ft
Circ liner volume. Up wt-117k.
String displaced with Water based mud - 100.00 % displaced
Ran Liner on landing string to 5900.0 ft
At Window · 5956.0 ft
Circulated at 5900.0 ft
CBU @ 8 bpm. Up wt-150k; Dn wt-125k. MU & LD cement
hd. Spill Drill-OS-1 min.
Obtained bottoms up (100% annulus volume)
Ran Liner on landing string to 9985.0 ft
Finish RIH w/7" liner. No hole problems.
On bottom
Cement · Liner cement
Circulated at 9985.0 ft
MU cement hd. Circ & cond mud. Stage up to 9 bpm.
Obtained req. fluid properties - 200.00 %, hole vol.
Held safety meeting
PJSM w/all personnel.
Completed operations
Mixed and pumped slurry - 33.000 bbl
Pumped 160 sxs Premium 'G' @ 15.8 ppg. Prceeded w/
Progress Report
Facility PB J Pad
Well J-05B Page 12
Rig Nabors 7ES Date 20 March 00
Date/Time
06 Mar 00
20:45
20:45-21:15
21:15
21:15-22:00
22:00
22:00-23:00
23:00
23:00-03:00
23:00-03:00
03:00
03:00-04:30
03:00-04:30
04:30
04:30-06:00
04:30-06:00
06:00
06:00-11:30
06:00-11:00
11:00
11:00-11:30
11:30
11:30-12:00
11:30-12:00
12:00
12:00-13:00
12:00-13:00
13:00
13:00-22:00
13:00-13:30
13:30
13:30-21:30
21:30
21:30-22:00
Duration
1/2 hr
3/4 hr
1 hr
4 hr
4 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
5-1/2 hr
5 hr
1/2 hr
1/2 hr
1/2 hr
lhr
1 hr
9 hr
1/2 hr
8 hr
1/2 hr
Activity
Cement pumped
Displaced slurry - 260.000 bbl
Displaced w/mud @ 9 bpm. Bumped plug to 3000 psi
w/calculated displacement.
Plug bumped
Functioned Permanent packer
Pressure up to 4100 psi to set liner top packer.
Bled off pressure. Floats holding-OK. Put 1000 psi on
DP & stung out of liner top packer. Circ 2 bbls
down DP. LD Cement hd & 1 it.
Equipment work completed
Reverse circulated at 5800.0 ft
Reverse 2 DP volumes @ 10 bpm. Pump dry job.
Heavy slug spotted downhole
Pull Liner, 7in O.D.
Laid down 4185.0 ft of 5in OD drill pipe
Drillstring handling equipment failed - Change operation
Repair
Repaired Drillstring handling equipment
Troubleshoot pipe skate.
Equipment work completed
Run Liner, 7in O.D.
Ran Drillpipe in stands to 4650.0 ft
RIH w/5" DP from derrick.
Stopped: To pick up/lay out tubulars
Run Liner, 7in O.D. (cont...)
Laid down 5815.0 ft of 5in OD drill pipe
D1 Drill-OS-l:30 min
At BHA
Rigged down sub-surface equipment - Setting tools
LD liner running tool. Clear floor.
Work completed, equipment laid out
Wellhead work
Removed Wear bushing
Pull wear ring. LD same.
Equipment work completed
Perform integrity test
Tested Liner
Test 13 5/8" x 9 5/8" x 7" f/30 min-OK. RD test
equipment & blow down.
Pressure test completed successfully - 2500.000 psi
Run Casing, 7in O.D.
Held safety meeting
PJSM on running liner tieback assembly.
Completed operations
Ran Casing to 5802.0 ft (7in OD)
MU 9 5/8" x 7" Baker 'ZXP' Tie-back Packer. RIH on
142jts 7", 26#, L-80 BTC-Mod casing. Up wt: 150k;
Dn wt: 125k.
At Top of liner: 5802.0 ft
Functioned Tie back packer
Sting-in. Verify position w/1000 psi. Check space
out. Unsting.
D
~ission
Facility
PB J Pad
Progress Report
Well J-05B Page 13
Rig Nabors 7ES Date 20 March 00
Date/Time
22:00
22:00-01:00
22:00-01:00
07 Mar 00 01:00
01:00-03:00
01:00-01:30
01:30
01:30-03:00
03:00
03:00-04:00
03:00-04:00
04:00
04:00-06:00
04:00-06:00
06:00
06:00-06:30
06:00-06:30
06:30
06:30-11:30
06:30-08:00
08:00
08:00-09:00
09:00
09:00-11:15
11:15
11:15-11:30
11:30
11:30-14:00
11:30-14:00
14:00
14:00-16:30
14:00-16:30
16:30
16:30-19:30
16:30-17:00
17:00
Duration
3 hr
3 hr
2 hr
1/2 hr
1-1/2 hr
1 hr
1 hr
2 hr
2 hr
1/2 hr
1/2 hr
5 hr
1-1/2 hr
1 hr
2-1/4 hr
1/4 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
3 hr
1/2 hr
Activity
Equipment work completed
Fluid system
Freeze protect well - 220.000 bbl of Diesel
RU & reverse 15 bbls water down annulus. PJSM w/
HB&R. Reverse 220 bbls diesel down annulus. Bleed
back 2 bbls to drop fluid in casing. Spill
Drill-OS-1:10 min.
Completed operations
Run Casing, 7in O.D.
Functioned Tie back packer
Sting-in to liner top. Setdown & verify pins
shearing. Bleed annulus pressure-No flow. Verify
packer set with 220k pull.
Equipment work completed
Cleared Standpipe manifold
Blow down top drive & drain stack. Blow down 7".
Equipment work completed
Nipple down BOP stack
Rigged down BOP stack
ND & PU stack.
Equipment work completed
Run Casing, 7in O.D.
Installed Emergency hang off assembly
Prep & set slips w/45k over string wt. Cut off 7".
Equipment work completed ~.,' ~ ~:~ . ..... '- ~'~
Run Casing, 7in O.D. (cont...)
Laid down 7.7 ft of Casing
LD cut-off & landing it.
Completed operations
Wellhead work
Removed Spacer spool
ND spacer spool. Set BOP stack back.
Equipment work completed
Welded casing stub
Dress 7" casing stub.
Completed operations
Installed Tubing head spool
Install 13 5/8" x 13 5/8" split speed head. Install
packoffs. Fire Drill-OS-1 min.
Equipment work completed
Tested Seal assembly
Test casing packoffs to 4325 psi-OK.
Pressure test completed successfully - 4325.000 psi
Nipple up BOP stack
Rigged up BOP stack
Work completed - BOP stack in position
BHA run no. 6
Serviced Top drive pipe handler
Service top drive. Change handling tools over from
5" to 4". Adjust top drive backup.
Equipment work completed
Test well control equipment
Installed BOP test plug assembly
Equipment work completed
200
Facility
Date/Time
PB J Pad
17:00-19:00
19:00
19:00-19:30
Duration
2 hr
1/2 hr
1/2 hr
1/2 hr
19:30
19:30-20:00
19:30-20:00
20:00
20:00-06:00
20:00-00:30
10hr
4-1/2 hr
3 hr
1/2 hr
08 Mar 00 00:30
00:30-03:30
03:30
03:30-04:00
2 hr
04:00
04:00-06:00
24 hr
5-1/2 hr
09 Mar O0
06:00-06:00
06:00-11:30
11:30
11:30-12:30
12:30
12:30-13:30
13:30
13:30-22:30
22:30
22:30-23:00
23:00
23:00-23:30
23:30
23:30-00:00
1 hr
1 hr
9 hr
1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
00:00
00:00-04:30
Progress Report
Well J-05B Page 14
Rig Nabors 7ES Date 20 March 00
04:30
04:30-06:00
1-1/2 hr
Activity
Tested BOP stack
Test BOPE to 250 / 3500 psi. Witnessing waived by
John Spaulding-AOGCC Field Inspector. Fire Drill-
OS-1 min.
Pressure test completed successfully - 3500.000 psi
Installed Wear bushing
Pull test plug & set wear ring.
Eqpt. work completed, running tool retrieved
Perform integrity test
Tested Casing
Test 7" casing.
Pressure test completed successfully - 3000.000 psi
BHA run no. 6
Made up BHA no. 6
MU BHA, Orient, & load MWD. Surface test MWD. Blow
down TD.
BHA no. 6 made up
Singled in drill pipe to 3072.0 ft
96 joints picked up
Pulled out of hole to 1760.0 ft
Std back 17 stds.
Stopped · To pick up/lay out tubulars
Singled in drill pipe to 4000.0 ft
Finish RIH. Filled pipe @ 4500' & 7500'. No
problems going thru 'RS' nipple @ 5815'. DI Drill-OS-l:30
min.
BHA run no. 6 (cont...)
Singled in drill pipe to 9854.0 ft (cont...)
Finish RIH. Filled pipe @ 4500' & 7500'. No
problems going thru 'RS' nipple @ 5815'. D1 Drill-OS-1:30
min.
At Top of cement · 9854.0 ft
Circulated at 9854.0 ft
Fill pipe & circ out air. Hookup blower hose on top
drive.
Obtained clean returns - 200.00 % hole volume
Serviced Block line
Cut & slip 85' drlg line.
Line slipped and cut
Cleared Standpipe manifold
Thaw out frozen standpipe.
Equipment work completed
Circulated at 9854.0 ft
Break circ & clear floor.
Broke circulation
Tested Casing - Via string
Pressure test completed successfully - 3000.000 psi
Circulated at 9854.0 ft
Circ & cond mud to drill cement.
Obtained req. fluid properties - 50.00 %, hole vol.
Drilled installed equipment - Landing collar
Drld cement, LC, FC, & cement to 9978'.
Completed operations
Circulated at 9978.0 ft
EI,.~}JI~I.L,~, IIILILI tU I,~U. IKI.~I Il-IN.
Facility
PB J Pad
Progress Report
Well J-05B Page 15
Rig Nabors 7ES Date 20 March 00
Date/Time
04:30-06:00
06:00-07:30
06:00-06:30
06:30
06:30-07:00
07:00
07:00-07:30
07:30
07:30-08:00
07:30-08:00
08:00
08:00-06:00
08:00-06:00
08:00-06:00
10 Mar 00 06:00-23:30
06:00-14:30
14:30
14:30-17:00
17:00
17:00-17:30
17:30
17:30-18:00
18:00
18:00-22:00
22:00
22:00-23:30
23:30
23:30-06:00
23:30-01:30
llMar00 01:30
01:30-05:00
05:00
05:00-06:00
05:00-06:00
Duration
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
22hr
22hr
22 hr
17-1/2 hr
8-1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
4 hr
1-1/2 hr
6-1/2hr
2 hr
3-1/2hr
1 hr
1 hr
Activity
Circulated at 9978.0 ft
Finish displacing well to QuikDril-N.
BHA run no. 6 (cont...)
Circulated at 9978.0 ft (cont...)
Finish displacing well to QuikDril-N.
Hole displaced with Water based mud - 100.00 % displaced
Drilled installed equipment - Float shoe
Drill Cement & FS.
Completed operations
Drilled to 10010.0 ft
Drill 25' new hole.
Stopped · To perform FIT
Perform integrity test
Performed formation integrity test
Obtained required level of integrity - 9.5 ppg EMW
BHA run no. 6
Drilled to 10538.0 ft
Fire Drill-OS-1 min; D2 Drill-OS-45 sec.
Drilled to 10538.0 ft
Bit started torquing up when reaming down after
slides. Taking more wt on bottom to drill.
BHA run no. 6 (cont...)
Drilled to 10793.0 ft (cont...)
Bit started torquing up when reaming down after
slides. Taking more wt on bottom to drill.
Reached planned end of run - Maximum hours on bit
Circulated at 10793.0 ft
Pump sweep. Monitor well-OK. Blow down top drive.
Hole swept with slug - 120.00 % hole volume
Pulled out of hole to 9985.0 ft
Hole in good shape.
At 7in casing shoe
Circulated at 9985.0 ft
Pump dry job. Remove blower hose. Blow down.
Heavy slug spotted downhole
Pulled out of hole to 217.0 ft
D1 Drill-OS-1:30 min.
At BHA
Pulled BHA
Download MWD. Remove offset pad on motor. Change
MWD probes.
BHA Stood back
BHA run no. 7
Made up BHA no. 7
Upload MWD. Orient. MU bit. RIH. Surface check
tools.
BHA no. 7 made up
R.I.H. to 9985.0 ft
RIH to shoe.
At 7in casing shoe
Circulated at 9985.0 ft
Finish screening down & circulating.
Circulated at 9985.0 ft
x'n~ g~pv. ona~v~ screens kl:_.~:_ ~ ~gr o .....
Facility
Date/Time
12 Mar 00
PB J Pad
Progress Report
Well J-05B Page 16
Rig Nabors 7ES Date 20 March 00
06:00-06:00
06:00-07:00
07:00
07:00-07:30
07:30
07:30-23:30
23:30
23:30-01:00
01:00
01:00-01:30
01:30
01:30-02:00
02:00
02:00-03:30
03:30
03:30-05:00
05:00
05:00-06:00
05:00-06:00
06:00-20:00
06:00-07:00
07:00
07:00-09:00
09:00
09:00-17:30
17:30
17:30-20:00
20:00
20:00-06:00
20:00-21:00
21:00
21:00-22:00
22:00
22:00-22:30
Duration
24 hr
1 hr
1/2 hr
16hr
1-1/2 hr
1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1 hr
1 hr
14hr
1 hr
2 hr
8-1/2 hr
2-1/2 hr
lOhr
1 hr
1 hr
1/2 hr
Activity down.
BHA run no. 7 (cont...)
Circulated at 9985.0 ft (cont...)
Fill pipe. Shaker screens blinding off. Screen
down.
Obtained clean returns - 100.00 % hole volume
R.I.H. to 10793.0 ft
Orient to Hi side & RIH below shoe. Hole in good
shape.
On bottom
Drilled to 11315.0 ft
D1 Drill-OS-l:30 min. Spill Drill-OS-l:45 min.
Reached planned end of run - Section / well T.D.
Circulated at 11315.0 ft
Circ sweep.
Hole swept with slug - 130.00 % hole volume
Pulled out of hole to 9985.0 ft
POH to shoe. Hole in good shape.
At top of check trip interval
R.I.H. to 11315.0 ft
On bottom
Circulated at 11315.0 ft
Circ sweep.
Hole swept with slug - 130.00 % hole volume
Laid down 1330.0 ft of 4in OD drill pipe
At 7in casing shoe
Circulated at 9985.0 ft
Pump sweep.
Circulated at 9985.0 ft
Recovered quite a bit of sand. Cleaned up good.
Fire Drill-OS- 1:45 min.
BHA run no. 7 (cont...)
Circulated at 9985.0 ft (cont...)
Recovered quite a bit of sand. Cleaned up good.
Fire Drill-OS-1:45 min.
Hole swept with slug - 150.00 % hole volume
Circulated at 9985.0 ft
Pumped 50 bbls seawater. Dropped ball. Opened PBL
sub. Increased rate & displace well to seawater.
Clean out possum belly & under shakers. Pump dry job.
Blow down.
Hole displaced with Seawater - 200.00 % displaced
Laid down 8768.0 ft of 4in OD drill pipe
At BHA
Pulled BHA
LD tools. Download MWD.
BHA Laid out
Run Gas lift completion, 4-1/2in O.D.
Removed Wear bushing
Equipment work completed
Rigged up Tubing handling equipment
H2S Drill-OS-2:30 min.
Work completed - Tubing handling equipment in position
Held safety meeting
PJSM w/all hands on running completion.
Facility PB J Pad
Date/Time
22:30
22:30-05:00
13 Mar 00 05:00
05:00-05:30
05:30
05:30-06:00
Duration
6-1/2 hr
1/2 hr
05:30-06:00
1/2 hr
1/2 hr
06:00-16:00
06:00-10:00
10:00
10:00~ 12:00
12:00
12:00-12:30
12:30
12:30-13:00
13:00
13:00-13:15
13:15
13:15-14:00
10hr
4 hr
2 hr
1/2 hr
1/2 hr
1/4 hr
3/4 hr
14:00
14:00-15:00
1 hr
15:00
15:00-16:00
16:00
16:00-17:30
16:00-17:30
17:30
17:30-22:30
17:30-20:45
20:45
20:45-21:30
1 hr
1-1/2 hr
1-1/2 hr
5 hr
3-1/4 hr
3/4 hr
Progress Report
Well J-05B Page 17
Rig Nabors 7ES Date 20 March 00
21:30
21:30-22:30
1 hr
Activity
Completed operations
Ran Tubing to 6110.0 ft (4-1/2in OD)
MU packer & tailpipe assembly. Start RIH as per tbg
detail.
Stopped: To circulate
Circulated at 6110.0 ft
Hole out of balance. Circ.
Obtained bottoms up (100% annulus volume)
Ran Tubing to 6500.0 ft (4-1/2in OD)
Continue running completion.
Ran Tubing to 6500.0 ft (4-1/2in OD)
Finish RIH w/total of 235 its 4.5", 12.6g, L-80,
IBT-Mod tbg. as per Tbg Detail. Mu hanger & land.
Run Gas lift completion, 4-1/2in O.D. (cont...)
Ran Tubing to 9835.0 ft (4-1/2in OD) (cont...)
Finish RIH w/total of 235 its 4.5", 12.6g, L-80,
IBT-Mod tbg. as per Tbg Detail. Mu hanger & land.
Hanger landed
Reverse circulated at 9835.0 ft
Reverse annulus to inhibited seawater.
Hole displaced with Inhibited brine - 100.00 % displaced
Held safety meeting
Drop setting rod/ball. PJSM.
Completed operations
Tested High pressure lines
Test lines to 3500 psi.
Pressure test completed successfully - 3500.000 psi
Functioned Permanent packer
Set Baker 'S-3' packer @ 9778' w/3500 psi.
Equipment work completed
Tested Tubing
Test tbg 30 min-OK. Bleed pressure to 1500 psi.
Pressure test completed successfully - 3500.000 psi
Tested Permanent packer
Test annulus & packer to 3000 psi f/30 min-OK.
Bleed tbg off to shear 'RP' valve. RD lines.
Pressure test completed successfully - 3000.000 psi
Installed Hanger plug
LD landing jt. Set TWC. Test to 1000 psi f/below.
Blow down lines.
Eqpt. work completed, running tool retrieved
Nipple down BOP stack
Rigged down BOP stack
ND & stand back stack.
Equipment work completed
Wellhead work
Installed Xmas tree
NU adapter flange & 4 1/8" 5K tree.
Equipment work completed
Tested Xmas tree
Test adapter & tree to 5000 psi-OK.
Pressure test completed successfully - 5000.000 psi
Retrieved Hanger plug
Pull TWC w/DSM.
Facility
PB J Pad
Progress Report
Well J-05B Page 18
Rig Nabors 7ES Date 20 March 00
Date/Time
22:30
22:30-01:30
22:30-01:30
14 Mar 00 01:30
01:30-06:00
01:30-03:30
03:30
Duration
3 hr
3 hr
4-1/2 hr
2 hr
Activity
Equipment work completed
Fluid system
Freeze protect well - 94.000 bbl of Diesel
Pump diesel down annulus. RP valve plugging up.
Completed operations
Wellhead work
Installed Hanger plug
Set BPV. Secure well & cellar.
Eqpt. work completed, running tool retrieved
Rig released @ 03:30 hrs on 3/14/00.
North Slope Alaska
Alaska State Plane 4
PBU_ WOA J Pad
J-O5B
Surveyed: 11 March, 2000
S UR VE Y REPORT
29 March, 2000
Your Reft API-500292012002
Surface Coordinates: 5970695.00 N, 643105.00 E (70° 19' 38.7794" N,
Kelly Bushing: 65.84ft above Mean Sea Level
148° 50' 21.8395" W)
Survey Reh svy9706
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical
Depth
(ft)
Survey Report for J-O5B
Your Ref: API-500292012002
SUrveyed: 11 March, 2000
5907.64 39.830 55.500 5353.20 5419.04
5956.00 39.630 55.010 5390.40 5456.24
5982.92 40.840 51.200 5410.95 5476.79
6050.96 40.950 41.790 5462.43 5528,27
6082.02 41.140 37.620 5485.86 5551.70
6113,69 40,720 33.390 5509.79 5575.63
6145.32 38.960 29.060 5534,08 5599.92
6177.20 37.670 24.600 5559.10 5624.94
6209.16 37.540 20.130 5584.43 5650.27
6238.39 37.630 16.080 5607,59 5673,43
6270.26 37.170 11.660 5632.92 5698.76
6301.72 36.690 6.730 5658.07 5723.91
6330,94 37.000 3.350 5681,46 5747.30
6364.47 36.470 359.930 5708.33 5774,17
6426.19 36.590 359.410 5757.92 5823.76
6521.43 37.400 3.770 5834.00 5899.84
6615.56 37.530 3.560 5908,72 5974.56
6710.11 37.070 7.340 5983.94 6049.78
6802.36 36.720 7.570 6057.72 6123.56
6897.63 36.070 7.120 6134.40 6200.24
6992.50 35.060 6.380 6211.57 6277.41
7087.87 34.300 6.630 6290.00 6355.84
7181.11 35.740 8.380 6366,36 6432.20
7278,36 35.090 8.600 6445.62 6511.46
7372,46 36.520 8.210 6521.93 6587.77
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates Dogleg
Northings Eastings Rate
(ft) (ft) (°/'~00ft)
937,41N 1211,24 E 5971655.34 N 644298.14 E
955.03 N 1236.64 E 5971673.44 N 644323.20 E
965.47 N 1250.54 E 5971684.15 N 644336.89 E
996.06 N 1282.76 E 5971715.35 N 644368.53 E
1011.75 N 1295.79 E 5971731.28 N 644381.25 E
1028.63 N 1307.83 E 5971748.39 N 644392.98 E
1045.94 N 1318.34 E 5971765.89 N 644403.15 E
1063.56 N 1327.27 E 5971783.68 N 644411.74 E
1081.59 N 1334.69 E 5971801.85 N 644418.81E
1098.52 N 1340.22 E 5971818.89 N 644424,03 E
1117,31 N 1344.87 E 5971837.75 N 644428.31 E
1135.95 N 1347.89 E 5971856.45 N 644430.98 E
1153.40 N 1349.42 E 5971873.93 N 644432.18 E
1173.44 N 1350.00 E 5971893,97 N 644432.38 E
1210,18 N 1349.79 E 5971930.70 N 644431.46 E
1267.43 N 1351.40 E 5971987.98 N 644431,98 E
1324.57 N 1355.06 E 5972045.18 N 644434,55 E
1381.59 N 1360.49 E 5972102.28 N 644438.89 E
1436.50 N 1367,68 E 5972157.33 N 644445,03 E
1492.56 N 1374.90 E 5972213.52 N 644451.19 E
1547.36 N 1381,39 E 5972268.42 N 644456.63 E
1601,27 N 1387.54 E 5972322.45 N 644461.75 E
1654.31 N 1394.54 E 5972375.61N 644467.74 E
1710.05 N 1402.86 E 5972431.50 N 644474.99 E
1764.51 N 1410.90 E 5972486.10 N 644481.99 E
0.768
10.185
9.050
8.836
8.849
10.384
9.569
8.543
8.456
8.545
9,536
7.016
6,301
0.538
2.882
0.194
2.471
0.408
0.738
1.157
0.8~1
1.883
0.681
1.539
Alaska State Plane 4
PBU_WOA J Pad
Vertical
Section
(ft)
Comment
1430.63
1458.88
1475.03
1517.92
1538,09
1558.77
1579.02
1598.72
1617.97
1635.32
1653.77
1671.27
1686.97
1704.39
1735.65
1785.39
1836.10
1887.62
1938.26
1989.90
2040.08
2089.32
2138.27
2190.20
2240.89
Tie-on Survey
Window Point
MWD Magnetic
Continued...
29 March, 2000 - 10:50 - 2 - DrillQuest 1.05.04e
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
.(tt)
Sperry-Sun Drilling Services
Survey Report for J-OSB
Your Ref: API-500292012002
Surveyed: 11 March, 2000
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(tt) (tt) (tt) (tt) (tt)
7465.40 35.380 7.540 6597.17 6663.01
7560.73 36.880 6.310 6674.16 6740.00
7653.88 35,480 6.290 6749.35 6815.19
7746.74 36.170 5.650 6824.64 6890.48
7840.27 36.450 5.150 6900.01 6965.85
7938.16 35.590 5.430 6979.18 7045.02
8033.31 34.490 5.650 7057.08 7122.92
8128.51 37.090 7.190 7134.30 7200.14
8223.74 36.460 6.730 7210.58 7276.42
8319.16 37.550 7.510 7286.78 7352.62
8413.20 37.090 7.170 7361.57 7427.41
8504.37 39.060 8.280 7433.33 7499.17
8596.80 38.890 9.210 7505.19 7571.03
8692.00 37.310 8,970 7580.11 7645.95
8790.53 35.990 8.030 7659.15 7724.99
8884.30 33.810 6.960 7736.06 7801.90
8981.75 33.350 7.230 7817.24 7883.08
9074.90 32.010 6.620 7895.65 7961.49
9167.94 31.470 6.790 7974.77 8040.61
9267.61 30.770 6,470 8060.10 8125.94
9360.11 30.250 6,200 8139.79 8205.63
9450.30 31.560 6,740 8217.17 8283.01
9482.79 33.780 7,610 8244.52 8310.36
9513.17 35.370 9,160 8269.53 8335.37
9545.85 36,260 9,570 8296.03 8361.87
1818.56 N 1418.38 E 5972540.28 N 644488.44 E
1874.35 N 1425.15 E 5972596.19 N 644494.14 E
1929.01 N 1431.18 E 5972650.95 N 644499.13 E
1983.06 N 1436.83 E 5972705.11 N 644503.75 E
2038.20 N 1442.05 E 5972760.34 N 644507.91 E
2095.52 N 1447.35 E 5972817.75 N 644512.12 E
2149.90 N 1452.62 E 5972872.21N 644516.36 E
2205.21N 1458.87 E 5972927.64 N 644521.55 E
2261.80 N 1465.78 E 5972984.35 N 644527.38 E
2318.79 N 1472.91 E 5973041.46 N 644533.41 E
2375.33 N 1480.19 E 5973098.13 N 644539.62 E
2431.04 N 1487.76 E 5973153.98 N 644546.12 E
2488.50 N 1496.60 E 5973211.59 N 644553.86 E
2546.50 N 1505.88 E 5973269.76 N 644562.04 E
2604.67 N 1514.58 E 5973328.08 N 644569.62 E
2657.85 N 1521.59 E 5973381.39 N 644575.62 E
2711.34 N 1528.25 E 5973434.99 N 644581.26 E
2761.27 N 1534.32 E 5973485.03 N 644586.37 E
2809.88 N 1540.03 E 5973533.74 N 644591.16 E
2861.04 N 1545.98 E 5973585.01 N 644596.13 E
2907.72 N 1551.16 E 5973631.77 N 644600.42 E
2953.74 N 1556.39 E 5973677.89 N 644604.77 E
2971.14 N 1558.58 E 5973695.33 N 644606.63 E
2988.20 N 1561.10 E 5973712.43 N 644608.82 E
3007.06 N 1564.21 E 5973731.35 N 644611.57 E
Dogleg
Rate
(°/100ft)
1.298
1.748
1.503
0.845
0.436
0.894
1.164
2.890
0.722
1.244
0.536
2.287
0.659
1.667
1.456
2.415
0.496
1.481
0.588
0.722
0.581
1.485
6.984
5.981
2.821
Alaska State Plane 4
PBU_WOA J Pad
Vertical
Section
(ft)
Comment
2290.95
2342.12
2391.94
2441.05
2490,85
2542.57
2591.75
2642.24
2694.17
2746.55
2798.63
2850.15
2903.82
2958.19
3012.39
3061.46
3110.61
3156.41
3200.90
3247.69
3290.25
3332.28
3348.28
3364.16
3381.89
Continued...
29 March, 2000 - 10:50 - 3 - DrillQuest 1.05.04e
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical
Depth
(ft)
Survey Report for J-O5B
Your Ref: API-500292012002
Surveyed: 11 March, 2000
9578.50 37.660 12.470 8322.13 8387.97
9609.37 39.750 12.920 8346.21 8412.05
9640.55 40.920 14.150 8369.98 8435.82
9672.48 41.840 14.640 8393.94 8459.78
9701.54 43.680 15.470 8415.28 8481.12
9732.54 45.850 15.270 8437.28 8503.12
9765.72 47.620 14.860 8460.02 8525.86
9796.82 48.980 14.900 8480.71 8546.55
9826.92 51.200 15.500 8500.02 8565.86
9861.43 53.230 15.800 8521.17 8587.01
9892.21 54.870 15.810 8539.24 8605.08
9926.26 56.760 16.430 8558.37 8624.21
9957.13 58.460 16.660 8574.90 8640.74
9984.82 60.260 15.280 8589.01 8654.85
9997.25 63.440 14.660 8594.88 8660.72
10021.60 71.850 12.220 8604.13 8669.97
10057.40 82.220 10.720 8612.15 8677.99
10077.50 87.400 11.260 8613.97 8679.81
10088.30 89.750 13.890 8614.24 8680.08
10119.20 93.260 22.430 8613.43 8679.27
10152.60 92.780 31.350 8611.66 8677.50
10185.90 91.100 41.220 8610.53 8676.37
10213.90 91.050 49.870 8610.01 8675.85
10242.10 91.970 57.670 8609.26 8675.10
10273.30 92.830 66.260 8607.95 8673.79
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
3026.33 N 1567.97 E 5973750.68 N 644614.96 E
3045.16 N 1572.21 E 5973769.59 N 644618.85 E
3064.78 N 1576.94 E 5973789.30 N 644623.20 E
3085.22 N 1582.19 E 5973809.84 N 644628.05 E
3104.27 N 1587.31 E 5973828.98 N 644632.82 E
3125.32 N 1593.10 E 5973850.14 N 644638.20 E
3148.65 N 1599.38 E 5973873.58 N 644644.03 E
3171.09 N 1605.34 E 5973896.13 N 644649.57 E
3193.37 N 1611.40 E 5973918.52 N 644655.19 E
3219.63 N 1618.75 E 5973944.92 N 644662.05 E
3243.60 N 1625.54 E 5973969.02 N 644668.38 E
3270.66 N 1633.36 E 5973996.22 N 644675.68 E
3295.65 N 1640.78 E 5974021.34 N 644682.63 E
3318.55 N 1647.34 E 5974044.37 N 644688.74 E
3329.14 N 1650.17 E 5974055.01N 644691.37 E
3351.02 N 1655.38 E 5974076.99 N 644696.17 E
3385.17 N 1662.30 E 5974111.26 N 644702.43 E
3404.81 N 1666.11 E 5974130.97 N 644705.87 E
3415.35 N 1668.47 E 5974141.55 N 644708.02 E
3444.67 N 1678.08 E 5974171.05 N 644717.07 E
3474.38 N 1693.15 E 5974201.05 N 644731.58 E
3501.18 N 1712.82 E 5974228.21 N 644750.73 E
3520.76 N 1732.79 E 5974248.17 N 644770.32 E
3537.41N 1755.51 E 5974265.25 N 644792.72 E
3552.05 N 1783.00 E 5974280.41N 644819.92 E
Dogleg
Rate
(°/100ft)
6.848
6.831
4.539
3.055
6.622
7.015
5.410
4.374
7.532
5.922
5.328
5.751
5.543
7.787
25.958
35.756
29.252
25.910
32.650
29.868
26.708
30.048
30.888
27.841
27.645
Alaska State Plane 4
PBU_WOA J Pad
Vertical
Section
(ft)
Comment
3400.30
3418.59
3437.80
3457.99
3476.93
3497.92
3521.11
3543.38
3565.56
3591.81
3615.82
3643.00
3668.2O
3691.17
3701.68
3723.09
3755.85
3774.61
3784.83
3814.87
3848.09
3881.21
3908.32
3934.36
3961.16
Continued...
29 March, 2000 - 10:50 - 4 - DrillQuest 1.05.04e
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical
Depth
(ft)
Survey Report for J-O5B
Your Ref: API-500292012002
Surveyed: 11 March, 2000
10307.20 91.720 74.900 8606.61 8672.45
10338.80 91.170 76.860 8605.81 8671.65
10370.10 88.890 76.910 8605,79 8671,63
10401.50 88.950 77.470 8606.38 8672,22
10432.60 89,020 77,110 8606,94 8672.78
10463.80 88.950 77.770 8607.49 8673.33
10495.90 89.320 78.150 8607.97 8673.81
10523.80 89.820 78.470 8608.18 8674.02
10556.00 90,620 77.520 8608.06 8673,90
10588.10 88,950 79.170 8608.18 8674.02
10615.50 90.000 79.100 8608,43 8674.27
10647.20 87.720 79.890 8609.06 8674,90
10676.60 87,970 80,840 8610.17 8676.01
10709.60 88.580 80.380 8611.16 8677.00
10743.70 88.770 79.330 8611.95 8677.79
10774.20 89.450 78.710 8612.42 8678.26
10804.50 87.170 79.910 8613.32 8679.16
10836.20 86.920 80.290 8614.95 8680.79
10866.30 86.800 79.860 8616,60 8682.44
10898.80 88.190 79,280 8618.02 8683.86
10929.90 88.090 78.830 8619.03 8684.87
10961.80 90.490 78,170 8619.42 8685.26
10993.10 91.050 77,420 8619.00 8684.84
11024.70 91.100 77,690 8618.41 8684.25
11054.80 90.860 76.770 8617.89 8683.73
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
3563.30 N 1814,91E 5974292.27 N 644851.62 E
3571.01 N 1845.55 E 5974300.56 N 644882.10 E
3578,11N 1876.03 E 5974308.24 N 644912.44 E
3585.07 N 1906.64 E 5974315.78 N 644942.92E
3591.91N 1936.97 E 5974323.20 N 644973.11E
3598.70 N 1967.42E 5974330.57 N 645003,43 E
3605.39 N 1998.81 E 5974337.86 N 645034.68 E
3611.04 N 2026.13 E 5974344.03 N 645061.89 E
3617.74 N 2057.63 E 5974351,33 N 645093.25 E
3624.23 N 2089.06 E 5974358.41 N 645124,56 E
3629.39 N 2115.97 E 5974364.09 N 645151,36 E
3635.17 N 2147.13 E 5974370.46 N 645182.41 E
3640.08 N 2176.10 E 5974375.93 N 645211,27 E
3645.47 N 2208.64 E 5974381.93 N 645243,71 E
3651.47 N 2242.20 E 5974388.57 N 645277,14 E
3657,28 N 2272.13 E 5974394.95 N 645306,96 E
3662.90 N 2301.89 E 5974401.14 N 645336.61 E
3668.34 N 2333.08 E 5974407.17 N 645367.69 E
3673.52 N 2362.68 E 5974412.92 N 645397,19 E
3679.40 N 2394.61E 5974419.40 N 645429,00 E
3685.30 N 2425.13 E 5974425.88 N 645459.40 E
3691.66 N 2456.39 E 5974432.84 N 645490,53 E
3698,28 N 2486.98 E 5974440.04 N 645520.99 E
3705.08 N 2517.83 E 5974447.43 N 645551,70 E
3711.74N 2547.18 E 5974454.64 N 645580.92 E
Dogleg
Rate
(°/~OOft)
25,676
6,440
7.286
1.793
1.179
2.127
1,652
2.128
3.857
7,313
3.841
7.612
3.339
2,315
3.128
3,017
8.502
1.434
1.481
4.634
1,481
7.803
2,990
0,869
3,158
Alaska State Plane 4
PBU_WOA J Pad
Vertical
Section
(ft)
Comment
3987.37
4009.88
4031.80
4053.67
4075.29
4O96.92
4118.96
4138.00
4160.10
4181.99
4200.40
4221.54
4240.80
4262.32
4284.91
4305.44
4325.72
4346.58
4366.41
4388.04
4408.95
4430.64
4452.20
4474.06
4495.01
Continued...
29 March, 2000- 10:50 -5- DrillQuest 1.05o04e
Sperry-Sun Drilling Services
Survey Report for J-O5B
Your Ref: AP1-500292012002
Surveyed: 11 March, 2000
North Slope Alaska
Alaska State Plane 4
PBU_WOA J Pad
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Dogleg Vertical
Rate Section
(°ll00ff) (fi)
Comment
1 1085.00 90.800 76,880 8617.46 8683.30 3718.62 N 2576.58 E
11119.10 88.500 76.670 8617.67 8683.51 3726.42 N 2609.77 E
11149.10 89.080 77.010 8618.30 8684.14 3733.25 N 2638.98 E
11179.40 89.690 77.850 8618.62 8684.46 3739.84 N 2668.55 E
11210.30 88.830 76.330 8619.02 8684.86 3746.74 N 2698.67 E
11240.40 88.890 76.570 8619.62 8685.46 3753.80 N 2727.92 E
11315.00 88.890 76.570 8621.07 8686.91 3771.12 N 2800.47 E
5974462.09 N 645610.19 E
5974470.52 N 645643.23 E
5974477.90 N 645672.30 E
5974485.06 N 645701.74 E
5974492.54 N 645731.71 E
5974500.14 N 645760.83 E
5974518.85 N 645833.03 E
0.415 4516.18
6.773 4540.10
2.241 4561.13
3.426 4582.14
5.651 4603.70
0.822 4624.94
0.000 4677.46
Projected Survey
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 27.118° (22-Feb-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 31.340° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11315.00ft.,
The Bottom Hole Displacement is 4697.23ft., in the Direction of 36.598° (True).
Continued...
29 March, 2000 - 10:50 - 6 - DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for J-O5B
Your Ref: AP1-$00292012002
Surveyed: 11 March, 2000
North Slope Alaska
Alaska State Plane 4
PBU_WOA J Pad
Comments
Measured
Depth
(ft)
5907.64
5956.00
11315.00
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
5419.04 937.41 N 1211.24 E
5456.24 955.03 N 1236.64 E
8686.91 3771.12 N 2800.47 E
Comment
Tie-on Survey
Window Point
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
5956.00 5456.24
To
Measured Vertical
Depth Depth
(ft) (ft)
5956.00 5456.24
11315.00 8686.91
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro
MWD Magnetic
29 March, 2000 - 10:50 - 7- DrillQuest 1.05.04e
Re: Tabasco 2T-204 and 2T-218 Procedure Change/.--...`
Subject:
Date:
From:
Organization:
To:
CC:
Re: Tabasco 2T-204 and 2T-218 Procedure Changes
Tue, 04 Apr 2000 09:22:08 -0800
Blair Wondzell <blair wondzell~admin, state.ak.us>
State of Alaska, Dept of Admin, Oil & Gas
Thomas A Brockway <TBROCKW~mail.aai.arco.com>
Chip Alvord <CALVORD@mail.aai.arco.com>,
Thomas W Mc Kay <TMCKAY~mail.aai.arco.com>,
"Randy L. Thomas" <RLTHOMAS@mail.aai.arco.com>
2T-204 PTD 200-016 and 2T-218 PTD 200-018
Tom,
I read this e-mail and to my question, you said that when you top-set and leave 204 and go to 218, the
shoe will not be drilled out in 204, and like-wise, when you top-set and leave 218, the shoe in 218 will
not be drilled out.
This e-mail should be sufficient notification and approval for this change to both drilling programs.
Sincerely, Blair Wondzell, 4/4/00.
Thomas A Brockway wrote:
Blair,
As I mentioned on the phone this morning, I was wondering about a change in the
proposed drill and complete procedures which have been submitted for the
upcoming Tabasco wells 2T-204 and 2T-218. The rig that is scheduled to drill
these wells, Nabors 16E, is currently +/- 17 days ahead of schedule on it's
current project and these wells have been accelerated to the point that
completion equipment will not arrive on the slope before the rig will need it.
In order to prevent having to shut down the rig to wait on completion equipment
I would like to do the following:
1) Drill and case the surface hole on 2T-204, topsetting the Tabasco production
interval as per plan
2) Suspend 2T-204 and move to 2T-218
3) Drill and case surface hole on 2T-218; drill intermediate hole; run and
cement intermediate liner string topsetting the Tabasco production interval as
per plan
4) Suspend 2T-218 and move back to 2T-204
5) Drill out and complete 2T-204 as per plan
6) Move to 2T-218
7) Drill out and complete 2T-218 as per plan
No other drilling or completion procedures will change from the original
submitted APD's and Nabors 16E will still be used to drill and complete the
wells as per the original permits and sundries.
Could you please let me know if I will need to fill out any 403 Sundry forms to
reflect these scheduling changes or will this e-mail suffice in this case.
Thanks for the help.
1 c~f2 4/4/00 9:43 AM
Re: J-05B-Permit to Ddl1200-018 ~'~-'- --
Subject: Re: J-05B-.Permit to Drill 200-018
Date: Wed, 23 Feb 2000 07:41:43 -0900
From: Tom Maunder <tom_maunder@admin.state.ak. us>
To: "Kolstad. Scott R (ARCO)" <KolstaSR@BP.com>
Scott,
I was just filing this message and noted that I miswrote. The 9-5/8" TOC is above
the intended sidetrack point. Thanks.
Tom
Tom Maunder wrote:
Scott,
Thanks for the note. tMth the additional research that indicates you will be
sidetracking above the TOC, I am satisfied that the abandoned portion of the
well bore will be isolated. Good luck with the well.
Tom Maunder
"Kolstad, Scott R (ARCO)" wrote:
I am writing to follow up our phone conversation regarding the changes to
the J-O5B program. As we discussed, we would like to change the planned 7"
long string to a 7"liner with 150' of liner lap, and bring oement to 1000'
MD above the top of the Sag River formation.
The cement top from the coil tubing squeeze of the J-O5a perforations was
tagged at 8,978' wire line depth.
I would also like to clarify that the cement squeezed into the J-O5a
perforations and the bridge plug we will set at -5, 900' will satisfy your
requirements for isolation of the original we//bore. Also, as we discussed
the temperature survey that you researched shows the cement top of the
original 9 5/8" cement job to be at 4, 850', prot4ding additional isolation.
I well drop off a re~4sed diagram indicating the proposed 7" liner.
Thanks for your help.
Scott
> Scott Kolstad
> Shared ServCces Drilling
> 900 E. Benson Blvd., MB 5-1
> Anchorage, AK 99507
> ph: (907) 564-5347
> fax: (907) 564-5193
Tom Maunder <tom maunder~,admin.state.ak, us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
, ,,~ o 2/23100 7:42 AM
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION CO~I~llSSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192 "
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stone
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
¸Re:
Prudhoe Bay Unit J-05B
BP Exploration (Alaska) Inc.
Permit No: 200-018
Sur Loc: 650'SNL, 1245'WEL, Sec. 09, T11N, R13E, UM
Btmhole Loc. 3188'NSL, 3802'WEL, Sec. 03, T1 IN, RI3E, UM
Dear Mr. Stone:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Camill~ Oechsli Taylor
Commissioner
BY ORDER OF THE COMMISSION
DATED this }f/'~ day of February,, 2000
dlf/Enclosures
CC2
Department of Fish & Game. Habitat Section w/o encl.
Department of Enviromnental Conservation w/o encl.
.., . ~_. STATE OF ALASKA ~
ALASl~i .L AND GAS CONSERVATION COM ;SION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepeni [] Service [] Development Gas [] Single Zone [] Multiple Zone ....
2. Name'"~f'"Operat0~ .... 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 63.37' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028281
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
650' SNL, 1245' WEL, SEC. 09, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
2694' NSL, 4917' WEL, SEC. 03, T11 N, R13E, UM J-05B
At total depth 9. Approximate spud date Amount $200,000.00
3188' NSL, 3802' WEL, SEC. 03, T11N, R13E, UM 02/21/00
12. Distance to nearest propertY 'line113. DistanCe to nearest well 14. Number of acres in property 15. 'Proposed depth (~D ~nd TVD)
ADL 028278, 2092' MD .I No Close Approach 2560 11346' MD / 8610' TVDss
16. To be Completed for'deviated wells .... 17. Anticipated pressure (see 20 AAC 25.035 (e) (2))
Kick Off Depth 5900' MD Maximum Hole Angle 90° Maximum surface 2606 psig, At total depth (TVD) 8590' / 3227 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement .....
Hole casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-M 9996' Surface Surface 9996' 8658' 156 sx Class 'G'
,
I-~ I'"~, ;!"' I Vi-U
19. To be completed for Redrill, Re-entry, and' Deepen Operations. ' ...... ' ' --
Present well condition summary
Total depth: measured 11709 feet Plugs (measured) 2-7/8" CIBP at 11100' (05~99) FEB 1 5 ?.000
true vertical 9005 feet
Effective depth: measured 11642 feet Junk (measured) Al~lm0il&GasOo~s. Co~mi~ioo
true vertical 9001 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 118' 20" x 30" 118' 118'
Surface 2553' 18-5/8" 4629 sx Permafrost II 2553' 2553'
Intermediate 9060' 13-3/8" x 9-5/8" 1550 sx Class 'G', 575 sx PF II 9060' 8073'
Production
Liner 1456' 7" 600 sx Class 'G' 8438' - 9894' 7505' - 8751'
2019' 2-7/8" 100 sx Class 'G' 9690' - 11709' 8592' - 9005'
Perforation depth: measured 10790' - 10820', 10870' - 10900';
BelowCIBP: 11220'-11320', 11370'-11470', 11520'-11620'
true vertical 9003' - 9002', 9001' - 9001';
Below CIBP: 8996' - 8999', 9000' - 9003', 9002' - 9001'
,,,
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Scott Kolstad, 564-5347 James Smith, 564-5026 Prepared By Name/Number: Terrie Hubble, 564-4628
21, I hereby certify that tl~e foregoing is true and correct to the best of my knowledge
Signed DanStone~/.~~~,.. ~"~~ Title Senior Drilling Engineer Date
O'<J 3- Commission Use Only
Permit Number _ I APl Number I Approval Date I See cover letter
~) '"' ~)/~;;~ I 50-029-20120-02 I ~ "' / ~ ~ (?~)I for other requirements
Conditions of Approval: Samples Required []Yes ]~,No Mud Log Required []Yes J~No
Hydrogen Sulfide Measures ~Yes [] No Directional Survey Required '~'Yes [] No
Required Working Pressure for DOPE r"! 2K; [] 3K; [] 4K; '1~ 5K; I-'110K; [] 15K ~,.~(:~3 ?~'~
Other: ~,~'~,.~
¢~r~3~ ~:,~u ~¢ by order of
Approved By ¢ ~mm~i 0~Cr!~!~ Commissioner the commission Date
Form 10-401 Rev. 12-01-85
Submit In Triplicate
J-05b Permit to Drill
I Well Name: I J-05b
Sidetrack Plan Summary
Type of Redrill (producer or injector):
Surface Location:
Target Location:
Bottom Hole Location:
I producer
650' FNL 124,5' FEL S9 T11N R13E
2,694' FSL 4,917' FEL T11N R13E S3
X=644640 Y=5974070 Z=858,5' TVDss
3188' FSL 3802' FEL T11N R13E S3
X=64,5744 Y=5974,586 Z=8610' TVDss
IAFE Number: 1 4P1345 I
Estimated Start Date: 1 2/21/00
]Rig: I Nabors7ES
I Operating days to complete: J20.7
I MD: I 11,346' I
ss: I I
IGL/MSL 134.87'
IRKB- 163.37'
IWell Design (conventional, slimhole, etc.): I Horizontal Sidetrack
Objective: I Horizontal producer in Sag River formation
Formation Markers:
Formation Tops MD TVDss Comments
UG4 Cased 4070'
West Sak WS2 Cased 5306' Is in very top of West Sak
Kick-off Point 5900' 5346'
WS1 6121' 5517' I"~ I--~'~ ~-' ~ ~ l~--~-
Seabee OM3 6367' 5718' I~l~,~,~.wl V i--1.
CM2 7008' 6230'
CMl 7472' 6603'
TH RZ 7897' 6956' '
BHRZ 8169' 7163' ~.1,,,,6~ m · ~_,- ,,,,..,,, ,-,,._. ,,!
- --__.'-=-~ w ~,~ -...--'~'.-- t,/'~q I~, WlIIII.
LCU 8190' 7180' A...~
TKNG 8289' 7277'
T Sag River 9996' 8585' At target entry point
TD 11346' 8610'
TSHU 8623' At point directly below target entry point
Casinq/Tubinq Proqram:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD
8 1~,, 7" 26# L-80 BTCM 9996' Surface 9996'/8658'
Tubing 4 1/2" 12.6# L-80 IBT-M 9846' Surface 9846'/8513'
J-05b Permit to Drill
Mud Program:
Intermediate Mud Properties: LSND
Density (PPg) I Funnel visI PV
10.2 I 40-50I 9-12
Kingak Section I
~.2 I 40-50 I 9-~2 I 25-30I 9.0-9.5
18 ½" hole section I
I BinghamYP I pH
25 - 30 9.0 - 9.5
Production Mud Properties: QuickdriI-N 16 1/8" hole section
Density (ppg) Funnel vis LSRV Bingham YP pH
8.3 - 8.5 40-50 <20,000 cP 20 - 25 9.0 - 9.5
Directional:
KOP: I 5900' MD
Maximum Hole Angle:
Close Approach Well:
9O° @ 10,114'
None
Logging Program:
Intermediate Hole
Production Hole(Horizontal)
IDrilling:
Open Hole'
Drilling:
Open Hole'
MWD / GR / Resistivity / PWD - Real time
None
MWD / GR/Resistivity / PWD - Real time
None
Cement Calculations:
Casing Size 17" Long String
Basis: I Tail based on 1000' MD of cement above the top of the Sag River with 30%
I
excess, and 80' shoe track.
Total Cement Volume: 32.42 bbl/182 f¢ / 156 sk of Dowell Premium 'G' at
15.8 ppg and 1.17 cf/sk.
Liner Size
IOpen Hole
Completion
FEB ~ 5 ~000
Well Control: ~a0,&a~,.,_, ~ Co.s.C~m~
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blir~'eq~ rams,
and annular preventer will be installed and is capable of handling maximum potential surface
pressures.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
· Maximum anticipated BHP: 3227 psi @ 8590' TVDss - Top of Sag River
· Maximum surface pressure: 2606 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
J-05b Permit to Drill
· Planned completion fluid: 8.5 ppg filtered sea water/6.8 ppg Diesel
· Planned BOPE test pressure is 3500 psi.
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· J pad is not designated as an H2S drill site. The highest level of H2S measured
recently on J pad was 50 ppm (on well J-26 on 6/7/99) with typical measurements near
10 ppm. Standard Operating Procedures for H2S precautions should be followed
at all times.
DRILLING CLOSE APPROACH:
There are no close approach issues for this well.
Intermediate Section:
, Hole condition and shale stability will be the most significant risk in this hole section.
The kingak shale is planned to be drilled with a maximum inclination of ~ 64° which will
require an anticipated mud weight of 11.2 ppg in order to maintain stability.
· The plannned well path does not cross any know faults.
· The FIT test is planned to 12.5 ppg EMW, which is 1.7 ppg above the planned
mud weight at TD of the hole interval.
PRODUCTION SECTION'
Lost circulation risk is Iow since there are no faults identified in the wellpath. There is
always the potential for small subseismic faulting, but those are not expected to cause
problems.
PWD pressure monitoring equipment will be used on the well while drilling to minimize
the risk of losses due to ECD.
The kick tolerance for the 9 5/8" whipstock exit point would be an infinite influx
assuming a gas influx in the Sag River at 8,600' TVDss. This is considering the worst
case scenario that the mud weight of 10.2 ppg encounters 7.6 ppg reservoir pressures
if the Sag River formation was in pressure communication with the Ivashak. This also
assumes a minimum fracture gradient of 12.0 ppg at the 9 5/8" window.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Class II drilling waste will be disposed at DS-4 grind and inject
facility. Any Class I wastes generated will be taken to Pad 3 for disposal.
RECEIVED
FEB 1 5 2000
Alaska Oil & Gas Cons. Commission
J-05b Permit to Drill
SUMMARY SIDETRACK PROCEDURES
Planned Pre-Rig Operations
1. Drift tubing.
2. RU coil and P&A existing perforations with 15.8 ppg Class G cement to place TOC at 9,000'
MD (Note: Open perfs from 10,790' - 10,820', 10,870' - 10,900', and CIBP at 11,100').
Squeeze the cement into place. Tag and test to meet AOGCC requirements.
3. The 9 5/8" casing is set on slips. Test the 9 5/8" pack off to 3500 psi (80% of the casing
collapse rating). Test the tubing hanger to 5,000 psi. On both the tubing hanger and the 9
5/8" casing head, COMPLETELY BACK OUT AND CHECK EACH LOCK DOWN
SCREW for breakage (check one at a time). Notify the ODE, Scott Kolstad, immediately
concerning any problems with backing out the lock down screws or other potential well head
problems.
4. Test the 9-5/8" casing to 3,000 psi against the packer. Hold 1,000 psi on the tubing to
prevent from collapsing the tubing.
5. Confirm that the well is dead. Punch the 7" tubing near 8300' and circulate the well to
equalize the hydrostatic pressure at depth. Chemical cut the 7" production tubing in the
middle of a joint near 6,325' (above PBR and 7" liner hanger/ packer assembly). The
chemical cut depth is approximately 2,000' above tubing punch.
6. Set a BPV in preparation for the rig move. Assure the IA and tubing are freeze protected to
near 2,000' TVD.
Rig Sidetrackinq Procedure
10.
1. MIRU. ND tree, NU and test BOPE. Circulate out freeze protect fluid and circulate
well to milling fluid through pre rig tubing cut and confirm well is dead.
2. Pull and LD 7" tubing down to the tubing cut at 6,325'.
3. Replace 9-5/8" pack off if necessary.
4. Set bridge plug in 9 5/8" casing at approximately 5,950'. Pressure test the 9 5/8"
casing to 3000 psi.
5. PU Bit and whipstock mills for 9 5/8" 47 Cf casing. RIH with whipstock to place KOP
within the West Sak formation at 5900' MD.
6. RIH with bottom trip whipstock for 9 5/8" 47# casing. Whipstock sidetrack at +/-
5900' MD.
7. Drill 8 Y2" hole from 5,900' to 9,996' to land at about 64 degrees in the Sag River
formation. Run MWD/GR/Res+PWD real time LWD. No other logs are planned.
8. Run and cement 7" long string in top of Sag River at 9,996'.
9. Drill out 6 1/8" hole from 9,996' to 11,346' MD building to horizontal in the Sag
River. Run MWD/GR/Res+PWD real time LWD.
Planned open hole completion. Slotted or conventional liner are contingency
11.
12.
13.
options.
Run 4 1/2,,, 12.6 #/ft, L80, IBT-Mod production tubing. Set
Freeze protect permafrost zone through the top GLM.
Set BPV, ND BOPE, NU and test tree. RDMO.
FEB 1 5 2000
Oil & Gas Cons. Commission
Anchorage
oSO-?,
TREE'. 6' CAMERON
WELLHEAD: McEVOY
ACTUATOR: 8" OTIS
J-05B
Proposed
Orig. KB. ELEV = 58.15'
Odg. BF. ELEV = 38.25'
! 1-3/4" x 9-5/8" THERMOCSG
Top 9-6/'8" PBR 2036
2553'
'X' NIPPLE ~
4-1/2" GLMs, 3 - 1" KGB-2LS
Botlom Trip Whipstock, + / - 6300'
LBridge Plug
"7", 26¢¢, N-80, IJ4S
TOP OF 7" PBR. 8335'
TOP OF7" PBR. B433'
9-5/8" PKR (BET) 8457'
TOP OF 7" LINER HANGER 8459'
4-1/2", 12,6#, L-80, IBT-Mod, tubing, stab WLEG
into 4-1/2" Finer top (if run) at 9,850' MD
7", 26#, L-80, BTCM long string,
shoe at 9,996' MD.
HES "TN'f" produc~io~ packer
Planned OH completion. Contingency: 4-1/2",
12.6¢, L-B0, IBT-Mod, slob[ed liner, shoe at
I, ne ECP.
47#/ft,N~80, BTRS
Coiled Tubing Fish-Top @ 9932'
Whipstock # 1-Top @ 9338'
Halliburton 2-7/8"CIBP 11,100'
PBTD - (Latch Collar 11643')
2 7/8% 6.16¢, L-80, STL Liner
Abandoned Sidetrack TI~ - 10774'
Cement 10475' - 9988'
~- -tic
5/80¢99 ~ KJW ~ Set CIBP
~ ~ JES ~ P~;~8 Completion
11,709'
PRUDNOE BAY UNIT
WELL:J~SB
APl NO: 50-82~2012~XX
BP Amoco (Alaska)
Shared Services Drilling
5250 --
6000 --
6750 --
"'", JKOP S ar[ D r @ 8.000~/100ft: 5900.00ft MD 5413.74ft TVD
%-End~,,,, Dir: 6285,09ft MD, 5717.18ft TVD
Sail @ 36.500° Inclination on 7.000" Azimuth
J-O5B WP08
7328,25ft TVD
Current Weld Properties
w;ii ,~.os~ wps
~2
-~- 9000 --
1500
Scale: linch = 75Oft
3OOO 375O
Vertical Section
i
2250 4500 5250 6000
Section Azimuth: 31,338° (True North)
4000
35OO
3OOO
2500
2OOO
1500
1000
Scale: linch = 500ft
1000 1500
Shared Services Drilling
,I-O.~B W,nOR
Eastings
2000 2500 3000 3500
Dir: 10445.95ft MD, 8684,6
7" Casing
999595 MD
8658 25 TVD
9995.95ft MD, 8658.25ft TVD
'Stad Dir @ 6.035<'/100ft: 9444.59ff¢;~D, 8290~!~i~Jt~VD
'Sail @ 36.500° Inclination on 7~;900¢ Azimuth
6285.09ft MD, 5717.18[t TVD
'KOP: Start Dir @ &000°/100ft: 5900.00ft MD, 5413~74ft TVD
1000 1500 2000 2500
Scale: linch = 50Oft
3000 3500
Reference is True North
DrillQuest'
4OOO
35OO
3OOO
2500 .----*
O
Z
20OO
1500
1000
Drilling ces
Proposal Data - J-O5B WPS - J-O5B Wp08
9 February, 2000 - 16:00 - I - DrillQuest
North Slope Alaska
Alaska State Plane 4
PBU_ WOA J Pad, Slot J~O5B WPS
J-O5B WPS-
PROPOSAL REPORT
Surface Coordinates: 59~706 g~iii~OiiiNiiiiiiiiiiii 643105.00 E (70° 19' 38.7794"N,
Keily BuS~h!ing::~a.25ft above Mean Sea Level
148° 50' 21.8395" W)
s~er',r~-sL.Jn
DRILLING SERVICES
Proposal Ref: pro9631
Sperry-Sun Drilling Services
Proposal Report for J-O5B WPS - J-O5B Wp08
North Slope Alaska
Measured
Depth Incl.
(ft)
5900.00 39.880
5940.00 41.557
6000.00 39.548
6100.00 37.156
6200.00 36.159
6285.09 36.500
6300.00 36.500
6367.28 36.500
6400.00 36.500
6500.00 36.500
6600.00 36.500
6700.00 36.500
6800.00 36.500
6900.00 36.500
7000.00 36.500
7100.00 36.500
7200.00 36.500
7287.18 36.500
j~O0.O0
oo.oo
oo.oo
~00.00
oo.oo
36.500
36.500
36.500
36.500
36.500
36.500
36.500
Azim.
55.015
50.836
44.127
31.8o4
18.488
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7.000
7,000
7,000
7,000
7,000
7.000
7.000
7.000
7,000
Sub-Sea
Depth
5345.49
5375.81
5421.41
5499.95
5580.30
5648.93
5660.91
5715.00
5741.30
5821.68
5902.07
5982.46
6062.84
6143.23
6223.61
6304.00
6384.38
6454.46
6464.77
6545.16
6625.54
6705.93
6786.31
6866.70
6945.00
Vertical
Depth
(ft)
5413.74
5444.06
5489.66
5568.20
5648.55
5717.18
5729.16
5783.25
5809.55
5889.93
5970.32
6050.71
6131.09
6211.48
6291.86
6372.25
6452.63
6522.71
6533.02
6613.41
6693.79
6774.18
6854.56
6934.95
7013.25
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
937.47 N 1203.02 E ~55.24 N 644289.92 E
953.21 N 1223.81 E , ~i:~i~?!?::~ii~.i~.1.37 N 644310.41 E
979,50 N 1252,56 E~i::~;;~?:' 597'i:'i~21 N 644338,65 E
1028.10 N 1290,~i..~::ii:~ :~::~:59717~i~N 644375.86 E
1081,83 N 1316i~!;:~E ..~i.i~. ::?~971801,~3 N 644400,14 E
1130.81 N ..... :::::::::::::::::::::::::::::::::::::::::::::: 5971850,91 N 644410,26 E
1139.61 N :::ii:!? ::~:!i~ii]i~E %:?~971859,74 N 644411.18 E
1179,34 N :: i~i::~3~:.~Ei: ~:i:: .... 5971899,55 N 644415,30 E
1198,6~ Ni:i i 'i::i,~!~0 E 5971918.90 N 644417,30 E
1::::::::::::::::::: :::::: :: 13~65 E 5971978,07 N 644423.42 E
13i~i~3 N :.:: :::: :: i3~9.90 E 5972037,24 N 644429,54 E
5972096,40 N 644435.66 E
5972155,57 N 644441,79 E
5972214.74 N 644447.91 E
5972273,90 N 644454,03 E
1670.96 N
1722,43 N
1357,15 E
1364.40 E
1371.65 E
1378.90 E
1386,15 E 5972333,07 N 644460.15 E
1393.40 E 5972392.24 N 644466.27 E
1399,72 E 5972443,82 N 644471,61 E
1730.00 N
1789,04 N
1400.65 E 5972451.40 N 644472.39 E
1407,89 E 5972510.57 N 644478,52 E
1848.08 N
1907,12 N
1966,16 N
2025,20 N
2082,71 N
1415,14 E 5972569,73 N 644484,64 E
1422,39 E 5972628,90 N 644490,76 E
1429,64 E 5972688,07 N 644496,88 E
1436,89 E 5972747,23 N 644503,00 E
1443.95 E 5972804.87 N 644508,97 E
Dogleg
Rate
(°/100ft)
8.000
8.000
8.000
8.000
8.000
0.000
o.0o0
0.000
0.000
0.o00
0.o00
0.000
0.000
0.0o0
0.000
0.000
0.000
0.000
0.000
0.00o
0.o00
0.000
0.000
0.000
Alaska State Plane 4
PBU_WOA J Pad
Vertical
Section
(fi)
1426.38
1450.63
1488.04
1549.39
1608.45
1656.03
1664.11
1700.58
1718.31
1772.51
1826.70
1880.90
1935.09
1989.29
2043.49
2097.68
2151.88
2199.13
2206.07
2260.27
2314.47
2368.66
2422.86
2477.06
2529.85
Comment
KOP' Start Dir @ 8.000°/100ft
· 5900.00ft MD, 5413.74ft TVD
End Dir' 6285.09ft MD,
5717.18ft TVD
CM3
Sail @ 36,500° Inclination on
7,000° Azimuth
THRZ
Continued...
9 February, 2000- 16:16 - 2- DrillQuest 1.05.04e
North Slope AlaSka
Sperry-Sun Drilling Services
Measured Sub-Sea Ve~ical
Depth Incl. Azim. Depth Depth
(ft) (fi) (fi)
7900.00 36.500 7.000 6947.08 7015.33
8000.00 36.500 7.000 7027.47 7095.72
8100.00 36.500 7.000 7107.86 7176.11
8189.75 36.500 7.000 7180.00 7248.25
8200.00 36.500 7.000 7188.24 7256.49
8289.27 36.500 7.000 7260.00 7328.25
8300.00 36.446 7.000 7268.63 7336.88
8400.00 35.946 7.000 7349.33 7417.58
8500.00 35.446 7.000 7430.54 7498.79
8600.00 34.946 7.000 7512.26 7580.51
8700.00 34.446 7.000 7594.48 7662.73
8800.00 33.946 7.000 7677.19 7745.44
8900.00 33.446 7.000 7760.39 7828.64
9000.00 32.946 7.000 7844.07 7912.32
9100.00 32.446 7.000 7928.22 7996.47
9200.00 31.946 7.000 8012.84 8081.09
9300.00 31.446 7.000 8097.93 8166.18
9400.00 30.946 7.000 8183.47 8251.72
9444.59 30.723 7.000 8221.75 8290.00
9500.00 34.068 7.000 8268.53 8336.78
9600.00 40.103 7.000 8348.27 8416.52
9700.00 46.138 7.000 8421.23 8489.48
9800.00 52.174 7.000 8486.60 8554.85
9900.00 58.209 7.000 8543.66 8611.91
9995.95 64.000 7.000 8590.00 8658.25
Proposal Report for J-O5B WPS - J-O5B Wp08
Local Coordinates
Northings Eastings Northings
(ft) (fi) (ft)
2084.24 N 1444.14 E 59i~§:06.40 N
2143.27 N 1451.39 E N
2202.31 N 1458.64 E ..73 N
2255.30 N N
2261.35 N 1465.8~i~~
2314.06 N 1472.3~iE::ii:,i~:~:,~ .... 5973036.72 N
2320.39 N 5973043.06 N
2379.0QN i 5973101.80 N
2436,9~:?i~:~:' :: :: i~144 E 5973159.84 N
2494i~':2 N :~::::i :;:.: .:: 1494:::47 E 5973217.17 N
40
E
2661iiii~ N ~i?;~ 1515.02 E
2715!~i~!i N 1521.69 E
;;iiiii~i:iiiii;ii2769!~3 N 1528.27 E
2822.32 N 1534.76 E
2874.47 N 1541.17 E
2925.88 N 1547.48 E
2948.56 N 1550.27 E
2978.02 N 1553.88 E
3037.85 N 1561.23 E
3105.66 N 1569.55 E
3180.71 N 1578.77 E
3262.17 N 1588.77 E
3345.51 N 1599.00 E
Global Coordinates
5973273.79 N
5973329.7O N
5973384.88 N
5973439.34 N
5973493.08 N
5973546.07 N
5973598.34 N
5973649.86 N
5973672.59 N
5973702.12 N
5973762.07 N
5973830.03 N
5973905.24 N
5973986.88 N
5974070.40 N
Eastings
(ft)
644509.12 E
644515.25 E
644521.37 E
644526.86 E
644527.49 E
644532.95 E
644533.61E
644539.69 E
644545.69 E
644551.62 E
644557.48 E
644563.27 E
644568.98 E
644574.61E
644580.17 E
644585.65 E
644591.06 E
644596.39 E
644598.74 E
644601.80 E
644608.00 E
644615.03 E
644622.82 E
644631.26 E
644639.90 E
Dogleg
Rate
(~1oo~)
0.000
0.000
0.000
0.000
0.000
0.000
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
6.035
6.035
6.035
6.035
6.035
6.035
Alaska State Plane 4
PBU_WOA J Pad
VeAical
Section
(~)
2531.25
2585.45
2639.64
2688.28
2693.84
2742.22
Comment
2748.03
2801.84
2855.00
2907.52
2959.38
3010.59
3061.14
3111.02
3160.24
3208.79
3256.66
3303.85
3324.68
3351.72
3406.64
3468.89
3537.78
3612.56
3689.07
LCU
BHA/Form~ion Trend @
0.500°/100ft:8289.27ft MD,
7328.25ftTVD
Top Kingak
Sta~ Dir @ 6.035°/100ff·
9444.59ffMD, 8290.00ff TVD
Start Dir @ 22.000°/100ft:
9995.95ft MD, 8658.25ft TVD
7" Casina
Top Sag'River
Continued...
9 February, 2000- 16:16 - 3- DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Proposal Report for J-O5B WPS - J-O5B Wp08
North Slope Alaska
Measured Sub-Sea Ve~ical
Depth Incl. Azim. Depth Depth
~t) (fi) (fi)
10000.00 64.891 7.000 8591.75 8660.00
10100.00 86.891 7.000 8615.97 8684.22
10114.13 90.000 7.000 8616.36 8684.61
10200.00 90.000 25.891 8616.36 8684.61
10300.00 90.000 47.891 8616.36 8684.61
10400.00 90.000 69.891 8616.36 8684.61
10445.95 90.000 80.000 8616.36 8684.61
10500.00 90.000 80.000 8616.36 8684.61
10600.00 90.000 80.000 8616.36 8684.61
10700.00 90.000 80.000 8616.36 8684.61
10800.00 90.000 80.000 8616.36 8684.61
10900.00 90.000 80.000 8616.36 8684.61
11000.00 90.000 80.000 8616.36 8684.61
11100.00 90.000 80.000 8616.36 8684.61
11200.00 90.000 80.000 8616.36 8684.61
11300.00 90.000 80.000 8616.36 8684.61
11345.95 90.000 80.000 8616.36 8684.61
Local Coordinates
Nothings
(~)
3349.14 N
3444.81N
3458.83 N
3540.81N
3620.30 N
3671.65 N
3683.57 N
Global Coordinates
Eastings Northings
(ft) (ft)
1599.45 E 597~!074.03 N
1611.20 E .,,~iii~97~169.91 N
1612.92 E ~,: ?iiiiii?~iiB3.96 N
1781.8~i E:,ii ', :,!:? 5974399.96 N
.... !~it826.19 E; i?~ii i i~:: 5974412.73 N
3692.95 N ::':?;:::?~ ~i~:::iE ::::,:. ':~:?~i:::~5974423.13::='::::':=:':~:~'~:'=:':':"~:': : N
3710.32 ~:~:~ 5974442.37 N
3727..68'~;~ :.: 2076:38 E 5974461.61 N
37~i~5 N ,~ ::' ::': 21~ 86 E 5974480.85 N
376:~!~: ~:~:~-' ' ' ::::: ~73.34 E 5974500.09 N
2371.82 E 5974519.33 N
3797~:4 N:: : 2470.30 E 5974538.57 N
3814~5t N 2568.78 E 5974557.81 N
::3831;87 N 2667.26 E 5974577.05 N
3839'85 N 2712.52 E 5974585.89 N
Alaska State Plane 4
PBU_WOA J Pad
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Dogleg Ve~ical
Eastings Rate Section
(fi) (°/100fi) (fi)
644640.28 E 22.000 3692.39
644650.20 E 22.000 3780.22
644651.65 E 22.000 3793.09
644674.29 E 22.000 3875.70
644732.42 E 22.000 3974.62
644816.52 E 22.000 4062.73
644860.60 E 22.000 4095.96
644913.64 E 0.000 4131.66
645011.77 E 0.000 4197.71
645109.90 E 0.000 4263.76
645208.03 E 0.000 4329.81
645306.16 E 0.000 4395.86
645404.30 E 0.000 4461.91
645502.43 E 0.000 4527.96
645600.56 E 0.000 4594.01
645698.69 E 0.000 4660.06
645743.79 E 0.000 4690.41
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 31.338° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11345.95ft.,
The Bottom Hole Displacement is 4701.30ft., in the Direction of 35.238° (True).
RECEIVED
FEB 1 5 2000
AI~ Oil & Gas Cam. Commiaaion
Comment
End Dir' 10445.95ft MD,
8684.61ft TVD
Total Depth: 11345.95ft MD,
8684.61ft TVD
4 1/2" Liner
Continued...
9 February, 2000 - 16:16 - 4 - DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Proposal Report for J-O5B WPS - J-O5B Wp08
North Slope Alaska
Alaska State Plane 4
PBU_WOA J Pad
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
5900.00 5413.74 937.47 N 1203.02 E
6285.09 5717.18 1130.81 N 1327.07 E
7287.18 6522.71 1722.43 N 1399.72 E
8289.27 7328.25 2314.06 N 1472.36 E
9444.59 8290.00 2948.56 N 1550.27 E
9995.95 8658.25 3345.51 N 1599.00 E
10445.95 8684.61 3683.57 N 1826.19 E
11345.95 8684.61 3839.85 N 2712.52 E
Formation Tops
Measured Vertical Sub-Sea
Depth Depth Depth Northings Formation Name
(ft) (ft) (ft) (ft) (ft)
6367.28 5783.25 5715.00 1179.34 N 1333.03 E CM3
7897.41 7013.25 6945.00 2082.71 N 1443.95 E THRZ
8189.75 7248.25 7180.00 2255.30 N 1465.14 E LCU
8289.27 7328.25 7260.00 2314.06 N 1472.36 E Top Kingak
9995.95 8658.25 8590.00 3345.51 N 1599.00 E Top Sag River
KOP ' Start Dir @ o
8.000/~!:.9~t . 5900.00~!!i!~D 5413.74ft TVD
End Dir: 6285.09ft MD~571'7.1
Sail @ 36.500° Inclinati:~i!~D~!~° Azimuth
BHNFormation ~[~gnd @ ~!~[100ft' 8289.27ft MD, 7328.25ff TVD
Sta~ Dir ~ 6.0~:~99~t.: 94~ MD, 8290.00ft TVD
Sta~ Dir ~ 2.00~:100ft:.::9995.95ff MD, 8658.25ff TVD
End Di~::~0445.9~.~' 8684.61ff ~D
Total~::~?.? ~ 134~ft MD, 8684.61 ff TVD
RECEIVED
FEB 1 5 [ 000
Continued...
9 February, 2000 - 16:16 - 5 - DrillQuest 1.05.04e
hared
i
.erv ces
rilling
WELL NAME
J-05b
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in I
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
I
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
Permit ~ocgpqe~nt. ati~onfr~pared:
ODE:../f~ ~ Date~/4/a6
Per~t ~p~licati~ev~wed:
SDE~S:~~~ ~ Date:~~
Permi~pPlicat~n S~it~d:
TA: .~ ~A~ ~ Date:
ORIGINAL
['"] PRE-RIG WORK
Pre-Rig Memo Reviewed:
SDE/ES: Date:~
Pre-Rig Memo Sent to Slope:
ODE: Date:__
Pre-Rig Sundry Documentation Prepared:
ODE: Date:
Pre-Rig Sundry Application Reviewed:
s DE/ES: Date :~
Pre-Rig Sundry Application Submitted:
TA: Date:
SUNDRY NOTICE
D Sundry Documentation Prepared:
ODE: Date:
'-']Sundry Application Reviewed:
SDE/ES: Date:
I----1 Sundry Application Submitted:
TA: Date:
.NOTE:
IF SUNDRY IS FOR PRE-RIG WORK~ USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
Reason for Sundry (Check all that aooly)
Abandon Change Approved Program
Alter Casing Operation Shutdown
Suspend Re-enter Suspended Well
Repair Well Time Extension
Plugging Perforate
Pull Tubing Stimulate
Variance
Other(Explain): .~~~~~~
APPROVAL TO PROCEED
F~Fj 1 5 ?.009
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date:
TREE: 6" CAMERON
WELLHEAD: McEVOY
ACTUATOR: 6" OTIS
~:_ · ......... ,~ '-,. ~.,---
11-3/4" X 9-5/8" THERMOCSG
10-3/4", 55.5#/fl, N-80, BUTT
10-3/4" x 9-5/8" XO 1995
9-518" FOC 1996
Top 9-5/8" PBR 2036
13-3/8" x 9-5/8" XO 2151
9-5/8' FOC 2197
9-5/8" FOC 2359
18-5/8", 96.5/109#/fi,K-55, BTRS.
I J-05B Proposed
Orig. KB. ELEV = 58.15'
Orig. BF. ELEV = 38.25'
'X' NIPPLE
2000'
4-1/2" GLMs, 3 - 1" KGB-2LS
!
Gas Cons. Commission
Anchorage
IBottom Trip Whipstock, + / - 6300'
JBridge Plug
7", 26#, N-80, IJ4S
TOP OF 7" PBR. 8335'
TOP OF 7" PBR. 8433'
9-5/8" PKR (ROT) 8457'
TOP OF7" LINER HANGER [ 8459'
9-5/8", 47#Itt,N-80, BTRS
Coiled Tubing Fish-Top @ 9932'
Whipstock # 2 - Top
Window - 'Top 9894' /Boffom 9899'
Whipstock # 1-Top @ 9338'
4-1/2", 12.6#, L-80, IBT-Mod, tubing, stab
WLEG into 4-1/2" liner top at 10000'MD
7", 26#, L-80, BTCM long string,
shoe at 10150'MD.
HES "TNT" production packer
i,
x 4-1/2" at 9950'MD+/-
Baker 7' x 4~1/2" liner hanger at 10000'MD
4-1/2", 12.6#, L-80, IBT-Mod, slotted liner,
shoe at 11500'MD, no ECP.
Halliburton 2-7/8" ClBP 11,100'
PBTD - (Latch Collar 11643')
2 7/8"- 6.16#, L-80, STL Liner
11,709'
Abandoned Sidetrack - 10774'
Cement 10475'- 9938'
i ii iii imllll mmmm ~lmm u I
nAT[: ~IFV RY C, OMMFNT~ ..... PRUDHOE_BAY UNIT
_,.RIgAIqR r').q/Nr~rdir-_l P.T ~icletrne. k WELL: J-05B
1/11/.q9 .qRR Rc. hP. mRfic. ~nd PC, Rmri.~ir~n.q
~/~a/qo ~-~W /~,~,~ ~,~, _APl NO: 50-029-20120-~
[ 3121199 DK.A ~dd P~d~ -- ~F~ ~?T ~ 1 t ~ R~ 1R ,
......
5/30/99 KJW Set CIBP
......... BP Amoco (Alaska)
11/23/99 JES Proposed Completion
, ,, ........
DATE I CHECK NO.
VENDOR AL~51~AU / LA OD
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
120999 CK 1209991 100. O0 100. O0
HANDLINg INST: S/H TERRI HUBBLE X4&2B
THE ATTACHED CHECK I$ IN PAYMENT FOR ITEMS DESCRIBED ABOVE. I~l]lll~!lll ~ 1 OO. OO I O0, OO
BP EXPLORATION (ALASKA)., INC.
'P.O:BOX 196612
ANCHORAGE, ALASKA 99519-6612
No.H 1.59:956:.:.::
AN:AFI=IIJATE OF ' ": ' ' '""
NATIONAL CITY BANK CONSO~[DX:.~-D COMI~:~CI~:I~::ACCO~NT:'::I;
C£EVELAND. OHIO -' '
56-389
412 OD ~. 5t2~ 56
PAY
To The
ORDER
O~
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE'DRIVE
ANCHORAQE
AK 99501
DATE AMOUNT
12/10/99I $100- O0
NOT:VALID AFTER 120 DAYS
WE! ! PERMIT CHECKLIST
FIELD& POOL
WELL NAME ~/~/~ I;~'"O~",~ PROGRAM: exp
ADMINISTRATION 1.
.
3.
4.
5.
6.
7.
8.
9.
10.
11.
DATE 12.
~."/~,~ 13.
COMPANY
ENGINEERING
INIT CLASS
Permit fee attached .......................
Lease number appropriate ...................
Unique well name and number ..................
Well located in a defined pool ..................
Well located proper distance from drilling unit boundary ....
Well located proper distance from other wells?.'. .......
Sufficient acreage available in drilling unit ............
If deviated, is wellbore plat included ...............
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can be issued without administrative approval ......
Can permit be approved before 15-day wait ...........
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to ~,,~ O ~.) psig.
dev ¢" redrll v' serv wellbore seg ann. disposal para req
GEOL AREA B?~_~ UNIT# (~9//~ -~-~) ON/OFF SHORE (~!.
Y
Y
Y
P~...~,~? DATE
GEOLOGY
DATE
)
27. Choke manifold complies w/APl RP-53 (May 84) ........ ~ N
28. Work will occur without operation shutdown ........... ) N
29. Is presence of H2S gas probable ................. Y
30. Permit can be issued w/o hydrogen sulfide measures .....
31. Data presented on potential overpressure zones ...... ;~.,~,/,.~.
y,--~'
32. Seismic analysis of shallow gas zones ........... /I,///¢/ Y N
33. Seabed condition survey (if off-shore) ........... /tz//7 .,..,Y,. N
34. Contact name/phone for weekly progress reports [exploratory onl¥(,~ N
ANNULAR DISPOSAL 35.
APPR DATE
With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; ....... Y N
(B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N '
GEOL.,~./ ENGINEERING: UIC/Annular COMMISSION:
SF ._. ~.~ f2 ~,....5,
Comments/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 09~27~99)
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No 'special 'effort has been made to chronologically
organize this category of information.
· ,, ·
,o
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Sat Feb 17 15:14:47 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/02/17
Origin ......... ~ ......... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/02/17
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPEP~ATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
J-05B
500292012002
BP Exploration (Alaska), Inc.
Sperry Sun
17-FEB-01
MWD RUN 2 MWD RUN 3 MWD RUN 4
AK-MM-90254 AK-MM-90254 AK-MM-90254
M. HANIK R. KRELL R. KRELL
T. ANGLIN T. ANGLEN T. ANGLEN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RAi~GE:
MWD RUN 5
AK-MM-90254
R. KRELL
T. ANGLEN
9
liN
13E
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
OPEN HOLE
BIT SIZE
8.500
650
1245
.00
65.84
37.34
CASING DRILLERS
IN) SIZE (IN) DEPTH (FT)
9.625 5956.0
7.000 9985.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
STATED.
2. MWD RUN 1 IS DIRECTIONAL ONLY AiqD IS NOT PRESENTED.
3. MWD RUNS 2 - 5 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE
RESISTIVITY PILASE 4
(EWR4).
4. GAMMA RAY LOGGED BEHIND CASING FROM 9950' MD, 8637'
TVD TO
9985' MD, 8655' TVD.
5. MANUAL DEPTH CORRELATION PERFORMED USING J-O5 CBL
LOG DATED 11/28/72.
CORRELATION BASED UPON INFLECTION POINT JUST BELOW
CASING WINDOW. AFTER
ADJUSTMENT FOR KBE DIFFERENCES (+7.69 MD
CORRELATION DIFFERENCE
REQUIRED FOR J-05B) IT WAS DETERMINED THAT THE
FIELD LOGS REQUIRE A -4.5
FOOT DEPTH CORRECTION. THE FINALIZED DATA
PRESENTED HERE IS BLOCK
SHIFTED BY -4.5 FEET AS PER ROGER SELS. THIS
ADJUSTED LOG BECOMES THE
REFERENCE FOR THIS WELL.
THIS WELL KICKS OFF J-05 AT 5956' MD, 5456' TVD
(TOP OF WHIPSTOCK).
ALL MWD LOG AND HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCE
6. MWD RUNS 2 - 5 REPRESENT WELL J-05B WITH API#
50-029-20120-02. THIS WELL
REACHED A TOTAL DEPTH OF 11315' MD, 8687' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING )
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING )
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING )
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING )
SFXE = SMOOTHED FORMATION EXPOSURE TIME
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 5951 5 11261 0
ROP 5980 5 11310 5
FET 9396 0 11268 0
RPD 9396 0 11268 0
RPM 9396 0 11268 0
RPS 9396 0 11268 0
RPX 9396 0 11268 0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH GR
5951.5 5956.0
11310.5 11315.0
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP
MWD 2 5956.0
MWD 3 9443.5
MWD 4 9985.5
MWD 5 10793.5
$
REMARKS: MERGED MAIN PASS.
$
MERGE BASE
9443.0
9985.0
10793.0
11315.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD API 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Service Unit
DEPT FT
ROP MWD FT/H
GR MWD API
RPX MWD OHMM
RPS MWD OHMM
RPM MWD OHMM
RPD MWD OHMM
FET MWD HR
Min
5951.5
2.04
28 57
1 17
1 12
0 O6
0 12
0 81
Max
11310.5
282.31
458.96
1571.79
968.27
2000
1682.23
120.31
Mean Nsam
8631 10719
74.3027 10661
109.788 10620
11.5886 3745
11.8425 3745
31.1221 3745
18.1244 3745
5.242 3745
First
Reading
5951.5
5980.5
5951.5
9396
9396
9396
9396
9396
Last
Reading
11310.5
11310.5
11261
11268
11268
11268
11268
11268
First Reading For Entire File .......... 5951.5
Last Reading For Entire File ........... 11310.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 5956.0 9413.5
ROP 5985.0 9443.0
$
LOG HEADER DATA
DATE LOGGED: 02-MAR-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05
DOWNHOLE SOFTWARE VERSION: 65.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT) : 9443.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 30.3
MAXIMUM ANGLE: 41.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
TOOL NUMBER
PB01437HWG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
8.500
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
Water Based
11.40
42.0
9.0
5O0
3.0
.000
.000
.000
.000
.0
133.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 5956 9443 7699.5 6975
ROP MWD020 FT/H 2.04 282.31 92.3828 6917
GR MWD020 API 28.57 458.96 125.642 6916
First
Reading
5956
5985
5956
Last
Reading
9443
9443
9413.5
First Reading For Entire File .......... 5956
Last Reading For Entire File ........... 9443
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
RPM 9400.5 9941 5
RPD 9400 5 9941 5
RPS 9400 5 9941 5
RPX 9400 5 9941 5
FET 9400 5 9941 5
GR 9414 0 9949 0
ROP 9443 5 9985 0
$
LOG HEADER DATA
DATE LOGGED: 04-NLAR-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05
DOWNHOLE SOFTWARE VERSION: 65.31
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT) : 9985.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 31.6
MAXIMUM ANGLE: 58.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01437HWGRVM6
EWR4 ELECTROMAG. RESIS. 4 PB01437HWGRVM6
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 8.500
DRILLER'S CASING DEPTH (FT) : 9985.0
BOREHOLE CONDITIONS
MUD TYPE: Water Based
MUD DENSITY (LB/G): 11.40
MUD VISCOSITY (S) : 42.0
MUD PH: 9.5
MUD CHLORIDES (PPM) : 500
FLUID LOSS (C3) : 3.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): 1.940 75.0
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset
DEPT FT 4 1 68
ROP MWD030 FT/H 4 1 68
GR MWD030 API 4 1 68
RPX MWD030 OHMM 4 1 68
RPS MWD030 OHMM 4 1 68
RPM MWD030 OHMM 4 1 68
RPD MWD030 OHMM 4 1 68
FET MWD030 HR 4 1 68
0
4
8
12
16
20
24
28
.913
1.940
2.500
Channel
1
2
3
4
5
6
7
8
167.0
75.0
75.0
Name Service Unit
DEPT FT
ROP MWD030 FT/H
GR MWD030 API
RPX MWD030 OHMM
RPS MWD030 OHMM
RPM MWD030 OHMM
RPD MWD030 OHMM
FET MWD030 HR
Min
9400.5
4.64
76 34
1 17
1 12
1 11
1 13
1 19
Max Mean
9985 9692.75
111.98 29.6194
152.32 126.84
4.52 2.00228
4.38 1.9718
4.4 2.03148
4.44 2.04666
19.79 3.46231
Nsam
1170
1084
1071
1083
1083
1083
1083
1083
First
Reading
9400.5
9443.5
9414
9400.5
9400.5
9400 . 5
9400 . 5
9400.5
Last
Reading
9985
9985
9949
9941.5
9941.5
9941.5
9941.5
9941.5
First Reading For Entire File .......... 9400.5
Last Reading For Entire File ........... 9985
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FET
RPD
RPM
RPS
RPX
GR
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
9942 0
9942 0
9942 0
9942 0
9942 0
9949 5
9985 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
10754
10747
10793
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
STOP DEPTH
10754 0
10754 0
10754 0
10754 0
0
0
0
10 -MAR- 0 0
Insite 4.05
65.44
Memory
10793.0
60.3
93.3
TOOL NUMBER
PB1446GR4
PB1446GR4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPEP_ATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
6.125
QUIKDRIL-N
8.50
43.0
8.8
750
.8
1.050
.475
2.000
.950
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HR 4 1 68 28 8
80.0
185.0
75.0
75.0
Name Service Unit Min Max Mean Nsam
DEPT FT 9942 10793 10367.5 1703
First
Reading
9942
Last
Reading
10793
ROP MWD040 FT/H 2.91
GR MWD040 API 46.77
RPX MWD040 OHMM 1.4
RPS MWD040 OHMM 1.44
RPM MWD040 OHMM 0.06
RPD MWD040 OHMM 0.12
FET MWD040 HR 0.95
106.86
341.74
1571.79
968.27
2000
1682.23
120.31
37.8699 1616
62.022 1596
16.3258 1625
16.1245 1625
59.9282 1625
28.9965 1625
8.01811 1625
9985.5
9949.5
9942
9942
9942
9942
9942
10793
10747
10754
10754
10754
10754
10754
First Reading For Entire File .......... 9942
Last Reading For Entire File ........... 10793
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
RPD
RPM
RPS
RPX
FET
ROP
$
10747.5
10754 5
10754 5
10754 5
10754 5
10754 5
10793 5
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
STOP DEPTH
11265 5
11272 5
11272 5
11272 5
11272 5
11272 5
11315 0
Il-MAR-00
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM Ai~GLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Insite 4.05
65.44
Memory
11315.0
88.4
91.1
TOOL NUMBER
PB1446GR4
PB1446GR4
6. 125
QUIKDRIL-N
8.50
37.0
9.2
700
10.0
2 .200
· 914
2 .500
1.600
75.0
190.0
70.0
70.O
Name Service Order
DEPT
ROP MWD050
GR MWD050
RPX MWD050
RPS MWD050
RPM MWD050
RPD MWD050
FET MWD050
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
OHMM 4 1 68 12 4
OHMM 4 1 68 16 5
OHMM 4 1 68 20 6
OHMM 4 1 68 24 7
HR 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD050 FT/H
GR MWD050 API
RPX MWD050 OHMM
RPS MWD050 OHMM
RPM MWD050 OHMM
RPD MWD050 OHMM
FET MWD050 HR
Min
10747.5
4.58
49 71
11 49
12 31
13 01
14 33
0 81
Max
11315
129.9
71.22
17.09
18.67
19.5
20.98
19.48
Mean
11031.3
57.3025
59.958
14.1768
15.441
16.3636
17.8784
2.75042
Nsam
1136
1044
1037
1037
1037
1037
1037
1037
First
Reading
10747 5
10793 5
10747 5
10754 5
10754 5
10754 5
10754 5
10754 5
Last
Reading
11315
11315
11265 5
11272 5
11272 5
11272 5
11272 5
11272 5
First Reading For Entire File .......... 10747.5
Last Reading For Entire File ........... 11315
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/02/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/02/17
Origin ................... STS
Tape Name ................ UNBiNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/02/17
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Scientific Technical Services
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File