Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
200-086
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS FA L UL�'p$, LD (Ani 1 1; 1^nn 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operatigv t�,lk''"///t1111 ❑ Suspend ❑ Perforate 4 Other Stimulate ❑ Alter Casing El Change ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number 200-086 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20507-01-00 7 Property Designation (Lease Number): ADL 028282 8 028283 8. Well Name and Number: PBU N-1 OA 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10930 feet Plugs measured None feet true vertical 8741 feet Junk measured None feet Effective Depth: measured 10846 feet Packer measured 8960 feet true vertical 8744 feet Packer true vertical 8354 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 31 - 111 31 -111 0 0 Surface 2630 13-3/8" 30-2660 30-2660 5360 2670 Intermediate 5884 9-5/8" 29-5913 29-5440 6670 4760 Liner 3410 7" 5751 -9161 5311-8545 7240 5410 Liner 1932 4-1/2" 8998-10930 8390-8741 8430 7500 Perforation Depth: Measured depth: 9405-10840 feet True vertical depth: 8671-8744 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 27-9005 27-8397 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 8960 8354 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 356 1902 948 1959 253 Subsequent to operation: 659 27000 1116 1159 250 14. Attachments (required per20 nac 25.070 25.071. s 25.283) 15. Well Class after work: Daily Report of Well Operations 10 Exploratory ❑ Development RI Service ❑ Stretigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil RI Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Stechauner, Bernhard Contact Name: Stechauner, Bernhard Authorized Title: GC2 Le d PE Contact Email: Bernhard.Stechauner@bp.com Authorized Signature: Date: l /1 `/ 2oQContact Phone: +1 907 564 4594 Form 10-404 Revised 04/2077 380IMSL-IE-',AN 16 2020 Submit Original Only Daily Report of Well Operations PBU N -10A ACTIVITVnATF 01 ueRew My CTU #9. 1.75' Coil Objective: log, adperf MIRU. MU & RIH w/ HES logging BHA. Log well from 9914ft to 9350ft. POH. MU & RIH w/ SLB gun #1. Perforate from 9496ft to 9527ft using 3-3/8" 6spf 3406PJ. 12/22/2019 ***In Progress"* CTU #9. 1.75' Coil ***Continue from 12/22/19*** Objective: log, adperf MU & RIH w/ SLB gun #2. Perforate from 9451ft to 9482ft using 3-3/8" 6spf 3406PJ. POH. Guns fired, recover ball. MU & w gun a orate rom 4 to 436 using 3-3/8" 6spf 3406PJ. POH. Guns fired, recover ball. RDIVIO. Wellnot FP per pa op. 12/23/2019 ***Com tete*** TREE = 4' CM1 WELLHEAD= FMC ACTUATOR= BAKER OKB. ELEV = 78.3' REFELEV= 72.74' BF. ELEV= 43.92' KOP = 3094' Max Ie= 99' @ 10566- 0566'Dat m MD = Datum 1043T Dahm TVD= 8800'SS 13-3/8' CSG, 72/t, L-80, D = 12.347 266 Minimum ID = 3.725" @ 9992' 4-1/2" HES XN NIPPLE /6- t U, 4/N, L -HU, D = 6.661' - 7iT BRIDGE RUG 6939' NLLOLIT WINDOW (N -10A) 5913'-5929' -12' LNR, 12.6#, 13CR NSCT/FOX, —� 152 bpf, D = 3.953' TOP OF 4-1/2'LNR { L-80 BTC -M, .0383 bpf, D = 6.276' PERFORATION SUMMARY REF LOG: SLB MCNL/GR/CCL ON 07/18/00 ANGLE ATTOP PERF: 78' @ 9405' Note: Referto Pmduction DB for Nstorkcal pert data SIZE SPF INTERVAL OprkGqz SHOT SOZ 33/8' 6 9405-9436 O 1223/19 RK 16 3316' 6 9451-9482 O 12!23/19 DONE 3-318' 6 9496-9527 O 1222/19 2-7/8' 6 9546-9561 O 08(18118 0820/18 2-78' 6 9574-9594 O 08/17/18 8076 7498 2-718' 6 9622-9684 O 08/17/18 1 2' 6 9684-9716 O 1021117 06-2-1- 338' 6 9752-9782 O 9)!2010 3318' 6 9805-9830 O 04/19/09 3318' 6 9880-9905 O 04/18/09 2' 6 10010-10030 O 0420)01 2- 6 10068-10100 O 1021117 2-718' 6 10155 -10180 O 04)05/05 2- 6 10218 -10250 O 1020/17 2-7/8' 4 10345-10370 O 08)08100 2' 6 10"2-10474 O 1020/17 2-718' 4 10495-10520 O 08/08/00 2-7/8' 6 10590 -10640 O 04/05/05 2-7/8' 4 10705-10730 O onato0 2- 6 10739-10759 O 0420101 2-7/8' 4 10820 -10840 O OB)08/00 PBTD 10846' = 3.953' SAFETY NOTES: WELL ANGLE>70"@9314 4-12" CHROME TBG)" 2197' 4-12' HES X NP. D = 3,813' GAS LFT MANDRELS ST MD TVD DEVI TYPE VLV LATCH PORI DATE 6 2992 2991114CAMCO CORRECTDN TOADPERF TYPO CANICO DONE RK 16 0621/16 5 5356 4996CAMCO MGS/JMD GLV C/O 07/30/17 01/1420 DONE RK 16 0621/16 4 6509 5978CAMCO DMI' BK 0 06)11/16 3 7357 6798CAMOO 0820/18 JCF/JMD ADPERFS (08/17-18118) DONE SK 16 06/21/16 2 8076 7498 OMY BK 0 07/08/00 1 8837 8236CAMCO S/O BK 22 06-2-1- 5751 9-5/8' X 7' BKR ZXP LTP, D= 6.313' 5765' 9-518' —X7- BKR FLEX LOCK HGR, D = 6.250' I2-HE5X NIP, D=3.813 X 4-112' BKR S-3 R(R, D 1/2' HES XN NP, D = 3.72 X 5' ZXP LTP & HMC HYL 12' WLEG, D= 3.958' MD TT LOGGED 07/18/00 X 4-12' XO, D = 3.958' 131/4' LNR RESTRICTIDN (08/18/18) I DATE REV BY COMMENTS DATE REV BY COMMENTS 1212280 ORK�WIAL COMPLETION 07/30/19 BS/JMD CORRECTDN TOADPERF TYPO 07/1680 N8E5 SIDETRACK COMPLETKIN 0110620 MWJMD ADPERFS 08/03/17 MGS/JMD GLV C/O 07/30/17 01/1420 DD/JMD EDITS TO ELEVATDNS &ADPERFS 1024/17 BF/JMD ADPERFS (10)20-21/17) 06/04/18 JPK/JMD GLV C/O 06)02/18 0820/18 JCF/JMD ADPERFS (08/17-18118) SEC D = 4.438' PRUDHOE BAY UNfT WELL N -10A PERMIT No: 11000mo API No: 504)29-20507-01 BP Exploration (Alaska) • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday,June 4, 2018 1:30 PM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS GC2 Facility OIL;iK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;AK,OPS Prod Controllers;AK, OPS Well Pad MN;Ak, Ops West Area IL;AK,I RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Draughon,Austin; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects. Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A;Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer N-10A(PTD#2000860)Well barriers restored, MITs passed All, Producer N-10A(PTD#2000860)was made under evaluation on 5/16/2018 for having sustained inner annulus casing pressure above NOL. On 6/3/2018 slickline completed gas lift work and performed a passing CMIT-TxIA to 2,455psi,and MIT-T to 2,412psi. The passing pressure test confirms that two well barriers have successfully been restored. At this time the well is reclassified as Operable. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCANNED JUN U 4;2018. SMO From: AK, • 0 Well Integrity Engineer Sent: Wednesday, - 16, 2018 9:00 AM To: AK, OPS EOC Specialis , • • OPS GC2 Facility OTL; AK, OPS GC2 Field O&M TL; AK, OPS GC2 OSM; AK, OPS GC2 Wel!pad Lead; AK, OPS PCC Ops Lea., SPS Prod Controllers; AK, OPS Well Pad MN; Ak, Ops West Area TL; AK, RE$ GPB East Wells Opt Engr; AK, RES GPB West - •it Engr; AKOpsProdEOCTL; Draughon, Austin; 'Regg, James B (DQA) (jim.regg@alaska.gov)' Cc: AK, GWO Completions Well Integrity; AK, GWO DHD Well Integ • • •K, GWO Projects Well Integrity; AK, GWO SUIT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well 0. -•mp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janow • Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; eel, Joshua; Worthington, 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, May 16, 2018 9:00 AM To: AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad MN;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Draughon,Austin; Regg, James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer N-10A(PTD#2000860) Sustained inner annulus casing pressure above NOL,failed warm TIFL Attachments: N-10A.pdf All, Producer N-10A(PTD#2000860)was reported to have sustained inner annulus casing pressure above NOL after the well was shut in during an upset at GC2 on 5/15/2018. The well failed a subsequent warm TIFL the same day indicating a potential loss of one or more well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repair. Plan forward: 1. Slickline-Gas lift valve change out 2. DHD—Warm TIFL 3. Well integrity engineer-Additional diagnostics as needed Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 wo 1 RECEIVED STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIS N NOV 17 2017 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown Suspend ❑ Perforate Eg Other Stimulate Il Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:DAD Acid Stimulation I2I 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 200-086 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20507-01-00 7. Property Designation(Lease Number): ADL 0028282 8. Well Name and Number: PBU N-10A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 10930 feet Plugs measured feet true vertical 8741 feet Junk measured feet Effective Depth: measured 10846 feet Packer measured 8960 feet true vertical 8744 feet Packer true vertical 8354 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 31-111 31-111 Surface 2629 13-3/8"72#L-80 30-2660 30-2660 4930 2670 Intermediate 5884 9-5/8"47#L-80 29-5913 29-5440 6870 4760 Production Liner 1932 4-1/2"12.6#L-80 8998-10930 8390-8741 8430 7500 Liner 3410 7"26#L-80 5751-9161 5311-8545 7240 5410 Perforation Depth: Measured depth: See Attachment feet %MINED DEC 2 8 2.017! True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-9005 27-8397 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 9684'-9716',9752'-9782',9805'-9830',9880'-9905',10010'-10030',10068'-10100',10155'-10180',10218'-10250',10345'- 10370',10442'-10474',10495'-10520',10590'-10640',10705'-10730',10739'-10759',10820'-10840'. Treatment descriptions including volumes used and final pressure: 175 Bbls 60/40 Methanol/Water,683 Bbls 2%KCL w/F-103,266 Bbls Diesel w/Lube 776,193 Bbls 90:10 DAD Acid,14.7 Bbls Xylene,796 psi. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 470 3345 1008 1099 268 Subsequent to operation: 513 5058 1090 1127 252 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development IJ Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil MGas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Ryan Rupert Contact Name: Ryan Rupert Authorized Title: GC2 Lead PE Contact Email: Ryan.Pupert@bp.com Authorized Signature: Date: l ( /474_ -4 I Contact Phone: +1 9075644328 — Form 10-404 Revised 04/2017 1/7-- 'i / (/ w /7 l l ��^^r S rr Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary November 15, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Addition of Perforations followed by a 90:10 DAD Acid Stimulation for Well N-10A, PTD # 200-086. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • a, H la _ L SC) M M CO N CO N LO M N- d) " O O O e- co co 6 r O co ao N r, co I- I,- CO 0) CO 1 N- L v v ❑ I-- N- N co I-- N- N- N- N- N- N- co N-- 03 00 00 00 03 CO 00 CO 00 CO 00 00 CO CO 0. 0 CO (0 0) LU I- (N M N- M CO CC) N t CO 0) QOC) ON- 1 NCoco T- 44000CAO4Cflo0 - ONO6 ❑ ❑ 1 CO N- N LO N- CO N- N- CO 0) CO CO N- N- N- N- >W O CO 00 00 CO 00 CO co co co co co co CO 00 CO 0 cc w w ❑ W Z w I- H O o_ 0 d g g Y U O 0 co 0 CO W 0 0 �+ d 0Nas Z(DNMMO0) LLUN (N4C) LJ C/3COCO C 0 N C 4 n co N- N 00 QZ Q Q W O J OdN- OO0000 00 0 0000 0 0 0 W ❑ 0000J ❑Q) m Z Z ❑ ❑ wQ ¢ ¢ _ ❑ ❑ o_ o_ OOw ZZO p t w w w o_ H H Q J Q Q 2 2 2 O m m v) m v) CO O Q Z = w CY N to O O 00 LO CO CC) N CC) O CC) 0) O tl 0 O O •- CO LO CA CA O M N M a) Cpf, QOOOOCNCO4CnCC00 W ❑ 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 ca a L a) U J I H E- 0 J cc 0 L. 2 O fn fn cn to fn d a. d 0 U c C LL LL LL LL LL LL IL IL CC LI.. CC LL Ce LL CC a a a a as aawawawaw d < < < < < < QQa < a < aQa 0. O t a> o_ ❑ w -J W ❑ ❑• a ,- 0 0 0 0 0 0 0 $ 0 0 0 0 0 c) > > Q LL C CV 0 0 0 0 N O N O N 0 0 0 0 0 W W J J Z N M O co `- N N 0000 N CO LO 00 0 00 Q W W W J W W �- �_ N_ N 0 (7 O O. O O O O co O co 4 co no Z ❑ J J tL W r r co ❑ ❑ J J 0_ 0_ O QQmmLLU)) ccnnwaa a, E m Z Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 00000000000poop co) i i i i i i i i i i i i i i i m a a a O J CU' OO w d ZZZZZZZZZZZZZZZ < < 03 m w L N cn o_ Ce • 0 Packers and SSV's Attachment PBU N-10A SW Name Type MD TVD Depscription N-10A PACKER 5751.47 5311.15 7" Baker ZXP Top Packer N-10A TBG PACKER 8960.05 8354.11 4-1/2" Baker S-3 Perm Packer N-10A PACKER 8997.73 8390.09 5" Baker ZXP Top Packer • • Q ` (J LJJ J J > N L H CoaiwOu_ Q Q H N ` _cm d > Ur C N Q '. L- a) 11-1- II 0)....'- -0 C >' C a) L ya O .NJ Q� 0 08 CN OCd co Q E /�� o d C c C _ U a) o rm0 © o-H O •C Tj @�\ 3 Q O O M V N- a) . . O 13 . ,L j 0 a3 O 7 O O C C 00 L .�- t/j LL O C co..g_ O C v °r° = N 3 .C N I- O Q > Q rn o o C om 0 QQQ O c) aO II °_° C E ° N N a o_ L_ p p d O Q O +J 0 0 J 0_._ O Q .-. N O 0 U) . r.., C N Q C C a0 7 p N } N • N 3 O - O O l0 N_ C Q 0 o � 0o 0M Q - 2c0\1 X CI)< -0o4- , a)rn n- U) `� c- c 't CO o0 X •� O N F- ,C Co 0 N c O • o W d • * H .c Q m 7 @� * ca o OC O > 12 o u) coo co O +r m Q o o a) d co C w 0) c !a < a) _0 CO-'a_o co o = 05 M .c J rn d °) moo } 0o � � � o oo � � ECD c w aaiw 4- ma m W N 5 1� O > 2 a M W N- nj _J O Q v ' _c U) •T L_ o Q , � 0 0 � N .- L (N C o, 1- -1 `' '- w J 0 � C ,- Q (A 4= > --_ � .0 Z � 0 H — p Oc •w oa • a) rn oco zea Wii w o c o = 0 rn' 20 J NY Q U -orn > 4- Q 3 • CEJ }, ._ Q C7 'NX � O ,73) CNz w voFH c � n' 0 0_ _I OO ,_ u_- oJ0 H N Q* rna Z F_ ;4. cool-- u- 0 2 * 0LL -0a= M01 - = Il to O a M *• of 10 L- M U) to M N 11 x Ju) Li 0 H a) •C II O Q II •L 0 ID D tM N � Ec000 < N 00) mw $ 0NM o°i Co olizao61 Oa p d � ©> ° o o > V) � _ - w a 's b � � " rn aa) < 02246e1,_ -1W O. ICD QtJi > d C NQ � ao � � ° � °� N � IQ� Qo V Q � m � Mm � � W re ECS C - < zce oO• Q �ocN.J H ov CD 0 E• � -0 oIxu) Li_ � � () (.90 a) m - a) - II wv � Hc•M rna) II a) O N 0 II Q > `' � z0i- A H z a) - z J c ,_ 0 Q UJ •cv 0 ~� � }' 3gcu 0aJC1 am E� ° go aim 0 > OzO �`'; 2 � - a CI oOQ a) c � C7 _ c) O � W � E c .c c'") > `-' aa) o 00 � -1r� 1xQ w C.P., Opo co 2 jzZO , V0o = = J > � 2U) -o •N > z1mOzu_ °- } 0 o � .- ali Q u) pXmm> 0c° WL° m ,� m5 = , OOw0w � a0 0 » O ---- c NM U •C 0 OCII, JU) Q a_ 0' (a SUN 2U) - ULLNU) mz _zW W0) (NJ 00 Z E O E JUF- Q � J NU) _o 0) Ni- '0j` O O J ,- 0 *_ HHWOJ II O W U) W W II `-' 0) CO II co 0-00M 'co W V. J W 0 0 d J W 0 © 3 _o a� It E H � H _I .> O D •c E 0 IT. 0_o s2 co � H J H 000 J � � J N C c) 0 j * WOWD * � 0 0 c > - O vao > * WDW * 4' 2D * HLA o m .SCev) : cn0cna : 1- ao0 = U) I- 0U.=_ , cnt U) Q 0) : : 00. w H Q N- I-- 1 1-- 1 r- 0 ,-o o 0 0 0 0 >- o H N o ca o) o > coco H I-- i i i r-- C)0 Q • • L- `O a) c c •c a O c g 3 o J J U) O c) QQ (7) N • O •-iio N ti >) r cn 2 0) N L- 0 0 l() Q) Q a) 00 c \ O Z O O 46 ❑ C U C ti c O O _a coO = -1 r a) r N N ° O �` L C (n U W ° (X ° O M U_ Q H co v Q V _O ti 70 � oZ � n > w � J o 3av aa) c) C.`.1.. d O 3 O 0 ° ° co D p O c') co � •yJ O .. EO EU a) r 3 � L N r O -O O O J Q'# O N d .- a Q Q O E O °Co ( •`- Co 4- tom/) : Q -° O a) -0 Or ,_ O r �_ a N O N U N = d N II Cl) C C a) m a) m as m ° a) ° ° O rn � Q -o N Io d O 30 p c o c E Q (1:7 C a) o U ' U ' LE ° 3 L5 Qm 'c = a z `p)w C o C o c - YFoCO ° v°i N -.7,. �� Q � d � � va gaoca a .0 _ o a) * ca 0 > co = s Q ;� a .5 Z Z rnb � � o O a) N O jl w E c 1- � � —_ -_ cc v a) , 0 co _ -c ` chr wU) > a � 5 > a) > a) .- •Co ca a) N Q O p > o J N CD a) > � > ma ,F Z,oFT) E 0. ° o cl ca r ca N o as H • O < a O O a m E ° E OUQ r 3Z m � - 45' ZOOoo a) m n: p 0 Q o E -° v Tu dao ° m0 C_ m 3 °) aa)) co c°a cnrnaav w a`) ' J * E .c O ets HO i a) P2 * � � - .- .n 0 O a) c o Q Z 3 �. a 0)1-1.) p � � o6r Q u oa>i � � � oz oz 0 � i° ° � go°i � Q O `n c rn * . vi Q IL ° rn•- li - w - v CD N ° a) L_ • ELM > 3 C CC io °) O O C °) 33 ° °) p N o _ ° `J, _c 00 d � �o ° c * c\I ° ° a) • , i ci > c) > Q .) o � U * �• 0 ° 0. O. a) CD w aa, u m Q Q - H Q a) Q a) U Q E U o 0 0a 3 o f° CL a) °- > w C to O F- a- a) o F- - I- e c6 E o a N ca c O v E "a J m A I- L0 JM � U � II Up a) 'o � Uo Uo `o a) ° � H � a) w c o E o "w ° = w ~ Q > N o) �? S Co ' U) ' Cl) ami E o o `n ^�, o F°- 73 2 a) aLo til ( � Q a) p O2 "N � a) .� ;c �) w ° m ° O W r ° ` ° N _ b _ ° 0 0 C ° � m m 05 > Q E c ° o Q ° Q ° o • = o t c rn E : N ° Co i so r ° mad_ co 0 p co 0 - U) • Q n o o V my rn E co� •N Co In 13 d c O J a) 'O y fn cp m C d CO fn c C in O 3 y- a) O N Q O ru_ � a a) O V 0 z � p 0 D O � J2 a) c °'ao OL \ coLL - Lo •- Q O Q V ° � � > W O y9 C + 7) a) � a) F-: > cc LE V U co . d La a).a O 4,-,;., N II ZO c2 II UU H. cp FO- •CCBCB H .Ca j 3 = `o -Cv 'c " •c aJ a) mow «n °) = » ce - _j = wooctooH .� 0) O �° 5o o - o = a) a`n) s F- > _cQ « > HUcn Jr � vc.) JUL- JUr- 002 Qat 3 .- : F- O 1- U- 1,- )` N- r r r r r r r O 0 0 o O o 0 0 0 N N N 0 CO 0) 0) o) ..... N r r ,- r r r M CO r O O O O O O CO r r r r r r • • ' C J - N m � LO Jo Jo a)U.) .c � m - a co caN Q0 3 C N- 0 a) _ rn D .c - o _Ne -.E. w oU N rnN 0 0 c 0 N m a) p > ?i c = 0 'U p m� d � 8U) - a) QC e- cZ CL a) ,, d O� O)- N _Ne N E n. ce E C cc •a) N U) c r o m L M Co = 3 m a u) = O U) a) otXccEN .9 _ o .§ 0 a)Eo o •� a � a = ED (i Ea . OU ;,= -oo15 E2 a� co aoI- o o = C = • 0 i a •= N > `- U 6 LI- 0 V • a) v) 4- N 0 3 N- - 0) • a N C OL a U O c o - � co * u6ia vrn 3 �� p • moo_ •= oZ C O * Om a ¢ * NIQ Normo = E C N .-47' C C oa * Zvi c = coCOM = Hca = � O 0 -0 o0_ a) O c N. N c ,� - US of m O a7 CL- C O J O O a - rn o o co.) cU o coo io `� c 0 0 N O 't CO p p)O °' N •N c o O N C U N Cfi •' W O N N_ `t - 't O N a.._. +. Z .. c C U Q Q C N O Q W a)p N O O N V ` V co O C := N p N N — — Q U I� O C) - `� N ++ N Z - ami E o' O O Q CO I� O O ` Q O N Ci O e0 > - E cD° tch x a) v) o `oma NO CO a) > E ..., > Eo 1_ TuQ. a) > o F— aai Q - x ai a) 10 (,) tea °' a U co O Q ce 0 =• N O c2 "0 c -0 0 a 3 .N 5 o C rn Q c O 4- X m iV 2 coc To 0 co o Q E � v• co co 0- co ai� � o o 920 -D Q ami � Q 0Z CCI� ' D Z O0 0 - — CD 0 Y M Oa c0oa ND ND p C = paU � C 2 LLZ CL 0 �2 U) .c •60 •- O O yr- W O >O W 2 c.-;.-5 t m O m O 3 .O _ p 2 a) C N N o -o -,,, "a 'O O N aQ ) c) N - * a X000 oZC Ea) : U N U Npo I- D � 2 O 1- D - c aM � (1 ° o � U) NJ > Q 3 - � Q o COas E a) cu N o ai acv) I- c � DOm O N DM -- 0 Om - s c (110U) 7 O C > �+ U - .tNO o m - - a: LC) -o - o oU -D U 347, N `nt - 0Q - - Lo NQMo � � N N .....11) 0 - 7,-; p_ Nd O o I-- a) 5 .� � NU0 N v Cl NU on Z 7m ' U) O_ Om0co u) NDaa Q Q) }, U) C) a) N U - Y a) j c C� o)Lij,., 2 °) I. L -0 0 c c § •. O N c • ai `t N O- N 0 ir) 4) co 't O o a) O o ._ Q `t y n o •. Q D Q ami . Q c 0_ O co 3 C o m o m : a a) O in a) -• aa) o o 2 - 00. a) •N a) is -15 (I)U c N — Ps; N .� vi N N N •*4: A Oi 7 Q L a) 7 Y �_ N N \ N N N ~ , O O > I,- Y C O Ns o ° M foo O' N OU) c `iNU) C c _- co cN D .0 `t Oet O O DQY 0)t xpbc E co0 ~ oNN03 U U ° 23a_ 0ax) oa.0 U _aUa0 _IUEa J U - 0 a - N- N- ti N- — — - - — 0 o O o O 0 0 '- L- N O O O O O — - - - - 0 • 73 2 0_ / 2 \_C ■O Co o0. U)CO N- 0) - 0- I- CN 02 L q2 � I � R � ± o .- O `C 0- e m 70 _1 _ o O 2 ° : 0 k ƒ c k z k k § • • 2 ) ƒ 2 6 ( = o = a c I $ f £ ? 9 c * E.D. ._ .- E % f O C O / ° o c & o 0 2 \ � • •L ,- . = a) q CO / § § / » f f &_6 co o OR § 2 � � � E E < 6 » a L. E k d / cm c§ k •E / k Q. 2 4-- .., k% - ay co ' 0_ � k 7 2 7 » 2 � 2 _ 5 © E 0 C \ k / 2 k / ZO a: = = ! '- o o — v � k < � � � 2 � � $ 0 � f Q 1. k "k § -C < 0 k k c mi c ( \ / E a / k / •CU• f / a) » • / / f o O } 1- '/ . g o 0 9 — U) = e = c ' g — o m o Ci -- _ 0) 7 § : < c k 5 2 | ¢ a) c •a = c = � 72 o < .E ° e E m c a / < 3 k / q \ 70 G & E 2 £ o = o :.=' a ,,_a) b & 7 $ @ `— e o ¥ Lp ± J/ / § f 2 22 M ± � f m_ J_ / « ® o W . .- I o -' « a o l a ° I / O = c # Q O •§ Q o t o Q O 0 0 k e ® O c o >.0 . R : = * 0 a_ o e Q U T) o c / _CI § k / :2 / q k 2 co / f / / 0 -) U o R 2 : _I E 0_Q U | 5 co 0 ,- cN c co x N- ¥ ¥ .0g2G222g2 CV q q co n '- g CO q a a a TREE= 4"CMI • WELLHEAD= RVIZ N 10 A S NOTES: WELL ANGLE>700 @ 9314 ***4-1/2"CHROME TBG"*' ACTUATOR= BAKER C OKB.ELEV= 78.3' BF.ELEv= 44.68' I ' 2197' H4-1/2"HES X NP,D=3.813" ) KOP= 3094' Max Angie= 99"@ 10566' 2688' H9-5/8"OV RCR Datum MD= 10437' GAS LET MANDRELS Datum ND= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80.D=12.347" -I 2666' 6 2992 2991 9 CAMCO DOME FE r 16 06/21/16 5 5356 4996 38 CAMOO DOME RK ' 16 06/21/16 Minimum ID =3.725" @ 8992' 4 6509 5978 16 CAMOO DMY BK ' 0 06/21/16 4-1/2" HES XN NIPPLE 3 7357 6798 13 CAMCO DOME BK r 16 06/21/16 2 8076 7498 14 CAMCO DMY BK ' 0 07/08/00 TOP OF7' LNR -{ 5751' 1,1 1 8837 8236 15 CAMCO S/O BK ' 22 _07/30/17 TOP OF WHIPSTOCK --I 6913' 5751' _19.5/8"X 7"BKR ZXP LTP,D=6.313" [9-5/8"CSG,47#,L-80,13=8.681" H -6913' I- 5765' _49-5/8"X 7"BKR FLEX LOCK HGR,D=6.250" BRDGE RUG .4 5939' i MLLOUT W PI)OW(N-10A) 5913'-5929' I I 8949' -14-1/2"HES X NP,D=3.813' Z8960' _17'X 4-1/2"BKR S-3 PKR,D=3.875" 8992' _14-1/2'HES XN NP,D=3.725" 4-1/2"LM,12.6#,13CR NSCT/FOX, --f 9005' .0152 bpf,0=3.953" 8998' _17"X 5"2XP LTP&HMC HYD LNR HGR D=4.438' TOP OF 4-1/2"LNR IH 9023' 9006' -14-1/2'WLEG,D=1958" L'__LW,2#,L-80 BTC-M,.0383 bpf,D=6.276" IH 9161' 9000" HELM TT LOGGED 07/18/00 9023' 5"X 4-12"XO,D=3.958" PERFORATION SUMMARY REF LOG:SLB MCNUGRIOCL ON 07/18/00 ANGLE AT TOP PERF:78'@ 9684' Pbte:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2" 6 9684-9716 0 10/21/17 3-3/8" 6 9752-9782 0 9/3/2010 1 3-3/8" 6 9805-9830 0 04/19/09 3-3/8" 6 9880-9905 0 04/18/09 1 2" 6 10010-10030 0 04/20/01 2' 6 10068-10100 0 10/21/17 2-7/8" 6 10155-10180 0 04/05105 2" 6 10218-10250 0 10/20/17 1 2-7/8" 4 10338-10363 0 08/08/00 1 2" 6 10442-10474 0 10/20/17 2-7/8" 4 10488-10533 0 08/08/00 2-7/8' 6 10590-10640 0 04/05/05 2-7/8" 4 10699-10724 0 08/08/00 1 2" 6 10739-10759 0 04/20/01 2-7/8" 4 10813-10833 0 08/08/00 1 H PBTD ,-1 10846' 4-1/2'LW,12.64,L-80,.0152 bpf,D=3.953" . 10930' ••E.•• DATE REV BY COMMENTS DATE REV BY COM ENTS PRIJDHOE BAY UNIT 12/22/80 ORIGINAL COMPLETION 08/03/17 MGS/JMD GLV CIO(07/30/17) WELL N10A 07/16/00 N9E5 SIDETRACK COMPLEION 10/24/17 BF/JMD ADPERFS(1020-21/17) PERMTNo:`2000860 06/13/16 JGUJMD GLV CIO(06/08/16) AR Pb: 50-029-20507-01 07/07/16 MGS/JMD GLV C/O(06/21/16) SEC 8,T11N,R13E,924'FSL 8 538'FML 02/21/17 JMD WBS CLEAN LP 07/17/17 JFK/JVD GLV CIO(07/15/17) BP Exploration(Alaska) • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, November 15, 2017 7:03 AM To: AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W; AK, OPS Well Pad Z;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Bergene, Matthew; Frankenburg,Amy; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua; Worthington,Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer N-10A (PTD#2000860) Passing MIT-OA and OART All, Producer N-10A(PTD#2000860) was put under evaluation on 10/31/17 for having sustained outer annulus casing pressure above NOL. On 11/05/17 DHD performed an arctic pack dump and pumped one bbl of neat methanol into OA to mitigate the frozen jewelry. On 11/09/17 they performed a passing MIT-OA to 1347 psi.The follow up outer annulus repressurization test(OART) also met passing criteria.The well is now classified as OPERABLE. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 SCANNED Cell:307-399-3816 .! From: AK, GWO - ntegrity Engineer Sent: Tuesday, October 017 2:09 PM To: AK, OPS EOC Specialists; A', •PS GC1 Facility OTL; AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS PCC Ops Lea., :K, OPS Prod Controllers; AK, OPS Well Pad DG; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB We Wells Opt Engr; Haffener, Jordan; 'Regg, James B (DOA) (Jim.reggOalaska.gov)' Cc: AK, GWO Completions Well Integrity; AK, GWO ' - ' Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Ja • .ski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tempel, . hua; Worthington, Aras J; 'chris.wallace@alaska.gov' Subject: UNDER EVALUATION: Producer N-10A (PTD# 2000860) Outer annulu •ressure found to be above NOL All, Producer N-10A(PTD#2000860)was discovered to have outer annulus casing pressure above NOL on 130/17. The pressure was discovered when DHD attempted to bleed the annulus and found the jewelry was frozen. Up. ' clearing 1 • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Tuesday, October 31, 2017 2:09 PM To: AK, OPS EOC Specialists;AK, OPS GC1 Facility OTL;AK, OPS GC1 Field O&M TL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad DG;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Haffener,Jordan; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua; Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer N-10A(PTD#2000860) Outer annulus pressure found to be above NOL Attachments: TIOChartjpg; N-10A.pdf All, Producer N-10A(PTD#2000860)was discovered to have outer annulus casing pressure above NOL on 10/30/17. The pressure was discovered when DHD attempted to bleed the annulus and found the jewelry was frozen. Upon clearing the ice block the OA pressure was reported to be 1,160psi. N-10 has known OA repressurization from an external shallow gas source that normally stabilizes at"750psi. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repair. Plan Forward: 1. DHD—Collect OA fluid sample for lab analysis 2. DHD—Arctic pack dump OA to evacuate fluid 3. DHD—MIT-OA to 1,500psi, if fails freeze protect annulus with methanol 4. DHD—Outer annulus repressurization test(OART) 5. Well Integrity Engineer—Additional diagnostics as needed. Please respond with any questions, Joshua Stephens -. Well Integrity Engineer SCANNED L . 8 L Office: 907-659-8110 Cell: 907-341-9068 wo 'Mir woes«,.masa+.. 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Wednesday,June 22, 2016 7:23 AM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M IL;AK;OPS GC2 Wellpad Lead;AK, OPS Prod Controllers;AK, OPS PCC Ops Lead;Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad MN; Wellman,Julie; Regg,James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; McVey,Adrienne; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer N-10A (PTD#2000860) Passed MIT-T Post-Gas Lift Valve Work All, Producer N-10A(PTD#2000860) passed an MIT-T to 2500 psi on 06/20/16,after Slickline set dummy gas lift valves.This passing test, combined with the passing CMIT-TxIA performed on 06/19/16,demonstrates two competent wellbore barriers.The well is reclassified as Operable. Work Completed: 1. Downhole Diagnostics: Cold TIFL–FAILED 05/22/16 2. Downhole Diagnostics:Warm TIFL–FAILED 05/23/16 3. Slickline: Change out Orifice GLV, run Caliper–DONE 06/08/16 4. Downhole Diagnostics: Cold TIFL–FAILED 06/13/16 5. Operations: POP for Warm TIFL–unable to POP due to surface issues 6. Slickline/Fullbore:Set plug, MIT-T,CMIT-TxIA–DONE 06/19/16; MIT-T FAILED, CMIT-TxIA PASSED 7. Slickline/Fullbore:Set Dummy GLV's and reattempt MIT-T–PASSED 06/20/16 8. Slickline: Re-set Live GLV's, pull plug–DONE 06/22/16 —E Line- ontingent LDL Thanks, Adrienne McVey Well Integrity Superintendent–GWO Alaska (Alternate:Jack Lau) WE® , 017 0:(907)659-5102 S� C:(907)943-0296 H:2376 Email: AKDCWeIlIntegrityCoordinator@BP.com Fr. 1• AK D&C Well Integrity Coordinator Sent: Monday, Jun- 2016 5:55 PM To: AK, OPS GC2 OSM; AK, .' 2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ry. , • D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West We ngr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad MN; Wellman, Julie; 'Regg, James B (DOA) (jim.regg@alaska.gov Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integr , - •a ineer; AK, OPS FF Well Ops Comp Rep; AK, D&C Well Integrity Coordinator; McVey, Adrienne; Hibbert, Michael; Janows i, •. 'e• Montgomery, Travis 3; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel,Troy; Worthington, • - J• 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday,June 20, 2016 5:55 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M IL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers;AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad MN; Wellman,Julie; Regg,James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep;AK, D&C Well Integrity Coordinator; McVey,Adrienne; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J;Wallace, Chris D (DOA) Subject: NOT OPERABLE: Producer N-10A(PTD#2000860) Failed MIT-T All, Producer N-10A(PTD#2000860)was reported to have sustained IA casing pressure above MOASP on 05/21/16.On 06/19/16, an MIT-T to 2500 psi failed, indicating the tubing may be compromised. Further diagnostics are currently underway to determine whether gas lift valves are the source of the TxIA communication. If not,the well will be left secured with a tubing tail plug.The well is reclassified as Not Operable. Work Completed/Plan Forward: 1. Downhole Diagnostics:Cold TIFL—FAILED 05/22/16 2. Downhole Diagnostics:Warm TIFL—FAILED 05/23/16 3. Slickline: Change out Orifice GLV, run Caliper—DONE 06/08/16 4. Downhole Diagnostics: Cold TIFL—FAILED 06/13/16 5. Operations: POP for Warm TIFL—unable to POP due to surface issues 6. Slickline/Fullbore: Set plug, MIT-T,CMIT-TxIA—DONE 06/19/16; MIT-T FAILED, CMIT-TxIA PASSED 7. Slickline/Fullbore:Set Dummy GLV's and reattempt MIT-T—IN PROGRESS 8. E-Line: Contingent LDL Please reply if in conflict with proposed plan. Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) 0:(907)659-5102 C:(907)943-0296 %C1d" JAN 0 4 Z0 17 H:2376 Email: AKDCWelllntegritvCoordinator@BP.com Fro D&C Well Integrity Coordinator Sent: Monday, ` • 116 7:59 PM To: AK, OPS GC2 OSM; AK, OP • O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan; AK, ID e -Il Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt En• RES GPB East Wells Opt Engr; AK, OPS Well Pad MN; Morrison, Spencer; 'Regg, James B (DOA) (jim.regg@alaska.gov)' 1 ( • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday, May 23, 2016 7:59 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad MN; Morrison, Spencer; Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep;AK, D&C Well Integrity Coordinator; McVey, Adrienne; Wallace, Chris D (DOA); Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R;Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer N-10A (PTD #2000860) Sustained IA Pressure Above MOASP Attachments: Producer N-10A (PTD #2000860)TIO Plot.docx All, Producer N-10A (PTD#2000860) was reported to have sustained IA casing pressure above MOASP on 05/21/16.The pressures were confirmed to be TBG/IA/OA= 2350/2350/110 psi. A cold and warm TIFL failed on 05/22/16 and 05/23/16, respectively, indicating a lack of two competent wellbore barriers.The well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics: Cold TIFL—FAILED 05/22/16 2. Downhole Diagnostics: Warm TIFL—FAILED 05/23/16 3. Slickline: Set Tubing Tail Plug 4. Fullbore: Perform MIT-T&CMIT-TxIA 5. Well Integrity Engineer/Anchorage PE: Additional diagnostics as needed A copy of the TIO plot has been included for reference. Please reply if in conflict with proposed plan. Thanks, MAY 2 5 20 6 Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) Office: (907)659-5102 Email: AKDCWeIlIntegrityCoordinatorPBP.com From: AK, D&C eIFInteg Coordinator Sent: Thursday, September 25, 2U14b:.30 AM To: AK, OPS GC2 OSM; AK, OPS GC2 Field 0&M TL;_AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Superinte�ent; AK, D&C Well Services Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt En , 'e , Denise G; AK, OPS Well Pad MN; 'chris.wallace@alaska.gov'; 'Regg, James B (DOA) (iim.regg@alaska.gov)' 1 • • • Producer N-10A(PTD#2000860) TIO Plot May 23, 2016 Well N-10 4 000 3 00'u. Tbg -U-IA 2.000. -46--OA 004 -g-000A 1000 -Or 022316 03'01'16 010616 011.616 03221£ 032916 04'0516 041216 04;19/16 04/1616 05.+0316 05'1016 '1-16 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning. They are available in the original file, may be scanned during the rescan activity or are viewable by direct inspection of the file. ~¢.~_- ~.~ ~'_~' Well History File Identifier RESCAN [3 Color items: ~"'" Grayscale items: o Poor Quality Originals: o Other: DIGITAL DATA ~"'"'~Diskettes, No./ [] Other, No/Type OVERSIZED (Scannable) [] Maps: o Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds TOTAL PAGES: I~ NOTES: ORGANIZED BY: BEVERLY E~RE~SHERYL MARIA LOWELL [] Other DATE:/~-- / Project Proofing PROOFED BY: BEVERLY BRE~HERYL MARIA ID Staff Proof By: Date: Isl PAGES; 70 (at the time of scanning) SCANNED BY'. BEVERLY ~ VINCENT SHERYL MARIA LOWELL Isl RESCANNED BY: BEVERLY~ VINCENT SHERYL MARIA LOWELL DATE: /O' O~' ~ ~ /SI General Notes or Comments about this file: PAGES: Quality Checked (done) Rev I NOTScan ned.wlxl STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISS~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate0 Other ^ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ~ Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ^~ Exploratory ^ ~' 200-0860 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: Anchorage, AK 99519-6612 ~ 50-029-20507-01-00 8. Property Designation (Lease Number) : ~ 9. Well Name and Number: ADLO-028282 ~ PBU N-10A 10. Field/Pool(s): ~ PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10930 feet Plugs (measured) None feet true vertical 8740.53 feet Junk (measured) None feet Effective Depth measured 10846 feet Packer (measured) 2582 8960 8998 true vertical 8744 feet (true vertical) 2582 8354 8390 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470 Surface 2632 13-3/8" 72# L-80 28 - 2660 28 - 2660 4930 2670 Intermediate Production 5866 9-5/8" 47# L-80 27 - 5913 27 -5440 6870 4760 Liner 3393 7"29# L-80 5751 - 9144 5311 - 8529 8160 7020 Liner 1932 4-1/2" 12.6# L-80 8998 - 10930 8390 - 8741 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12..6# 13Cr80 26 - 9005 26 - 8397 Packers and SSSV (type, measured and true vertical depth) 9-5/8" DV Packer 2582 2582 4-1/2" Baker S-3 Hvdro Set Packer 8960 8354 4-1/2" Baker ZXP Packer 8390 8998 ,~, ~ / ~ ~r ~ !! 12. Stimulation or cement squeeze summary: f, ~~ 2Q~1° Intervals treated (measured): 3 ~'a ~~~ ~~'F'~~3. ~k~+~SZiSS10f1 ~ ~ ~ Treatment descriptions including volumes used and final pressur e: ~ ~ r ~~;f"~ i5 ;C!f` 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 276 909 444 268 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Service ^ Daily Report of Well Operations X 16. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Pr ble Title Data Management Engineer Signature Phone 564-4944 Date 9/7/2010 UII11 IU-YV'4 j7[CVIJCU IIGVV~ ~~ ~ ~y vuv~~~~~ v~~y~~~u~ v„~~ ~ MS SEP 0~8 ~.~ ~~ N-10A 200-086 DFDF ATTAf_NMFNT U Sw Name Perf Operation Code Operation Date Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base N-10A PER 8/8/00 10,345. 10,370. 8,796.74 8,795.87 N-10A PER 8/8/00 10,495. 10,520. 8,781.27 8,777.51 N-10A PER 8/8/00 10,705. 10,730. 8,752.66 8,750.73 N-10A PER 8/8/00 10,820. 10,840. 8,745.42 8,744.44 N-10A APF 4/20/01 10,739. 10,759. 8,750.15 8,748.93 N-10A APF 4/21/01 10,010. 10,030. 8,766.04 8,767.37 N-10A APF 4/5/05 10,155. 10,180. 8,776.12 8,778.79 N-10A APF 4/5/05 10,590. 10,640. 8,766.63 8,760.3 N-10A APF 4/18/09 9,880. 9,905. 8,756.35 8,758.6 N-10A APF 4/19/09 9,805. 9,830. 8,744.89 8,749.32 N-10A APF 9/3/10 9,752. 9,782. 8,734.96 8,740.64 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • N-l0A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE I SUMMARY 9/2/2010, CTU #5 w / 1.75"ct Job scope: log perforate &venturi ,set treating packer ,acid. MIRU. Run PDS GR CCL logging tools to PBTD at 10,846'. Log from 10846 up to 9700. Paint flag. POOH. **Job continued on 9-3-10********** 9/2/2010 ASRC Test Unit #1 CTU on Iocatwn. ~PJSM (SIM OPS) begin rig up ***Job in .progress*** ***Inlet N-10, Outlet N-09*** 9/3/2010,CTU 5, 1.75" CT. Job Scope: Adperf,~Acidize. RIH w/ 30 ft of 3 3/8" PJ3406 HMX guns at 6 spf. Perforate 9752-9782. POOH. RIH w/ venturi jet basket and magnets. RIH w /treating packer set packer @ 10675' Perform injectivity test. AT 1.5 bpm circ psi = 3800 psi. at 1.2 bpm CT psi = 3100 psi. Begin Acid job ,complete 1st ;stage of HCI and Mud acid****JOB continued on 9/4/10*** 9/3/2010 ASRC Test Unit #1 CTU on location. Complete rig up. soda ash storage for duration of job. Standby for CTU. (***Inlet N-10, Outlet N-09*** Upright tank on location for ***Job in progress*** 9/4/2010ASRC Test Unit #1 CTU off location. Well POP, divert acidic liquid returns to tank Ifarm. Continue to monitor returns for pH levels. ***Job in progress*** ~***Inlet N-10, Outlet N-09*** ell Control Drill 9/4/20101CTU 5 1.75" CT, Job scope : **Continued from 9/3/10* Perform Acid Itreatment.Final injectivity while pumping displacement stage: 1.75 bpm at 3350 psi. Release treating packer and POOH. L/D treating packer. RDMO. «< Job complete »>*** 9/5/2010 ASRC Test Unit #1 pH-7, divert liquid returns to production. Stabilize well at a full open choke, start 8 hr test ***Job in progress*** ***Inlet N-10, Outlet N-09*** (Well Control Drill) 9/6/2010iASRC Test Unit #1 complete 8 hour test, RDMO ***Job ***Inlet N-10, Outlet N-09*** FLUIDS PUMPED BBLS 42 2% KCL XS W/SL 210 DIESEL 198 2% KCL 88 60/40 METH 125 3% NH4C1+F103 185 3% NH4C1 + F103 + U067 60 12% HCI 60 9:1 MUD ACID 60 3% NH4C1 + F103 + 3.5% L66 1036 Total TREE = 4" CNV WELLHEAD = FMC AOTUATOR = '~ " OTIS KB. ELEV = 72.74' !, BF. ELEV = 44.68' I KOP = 3094' 'Max Angle = 99 @ 10566' Datum MD = 10437 Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~--~ zs Minimum ID = 3.725" @ 8992' 4-1/2" HES XN NIPPLE TOP OF 7" LNR -r 57: ~ N-10A PERFORATION SUMMARY REF LOG: ? ON ? A NGLE AT TOP PERF: 80 @ 9805' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpntSgz DATE 3-318" 6 9805 - 9830 0 04/19/09 3-3/8" 6 9980 - 9905 O 04!18109 2" 6 10010 - 10030 O 04/20/01 2" 6 10739 - 10759 O 04!20101 2-7/8" 4 10813 - 10833 O 08/08100 2-7/8" 6 10155 - 10180 O 04/05/05 2-7/8" 4 10338 - 10363 O 08/08/00 2-7/8" 4 10488 - 10533 O 08/08/00 2-7/8" 6 10590 - 10640 O 04!05/05 2-7/8" 4 10699 - 10724 O 08/08/00 TOP OF WHIPSTOCK ~-{ 5913' BRIDGE PLUG TOP OF CEMENT 9-5/8" CSG, 47#, L-80, ID = 8.681" ~--~ 10042' 1 4-1/2" TBG, 12.6#, 13CR-80, .0152 bpf, ID = 3.958" -~ 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" I PBTD GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 2992 2991 9 CAMCO DOME RK 16 11/04/07 5 5355 4995 38 CAMCO DOME RK 16 11/04/07 4 6508 5977 16 CAMCO DMY BK 0 3 7357 6797 14 CAMCO DOME BK 16 11/04!07 2 8076 7498 14 CAMCO DMY BK 0 1 8837 8236 15 CAMCO S/O BK 22 11/04/07 MILLOUT WINDOW (N-10A) 5913' - 5929' ~ 4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" ~ DATE REV BY COMMEMS DATE REV BY COMMEMS 12!22180 ORIGINAL COMPLETION 11/19/07 DAV/PJC GLV C/O (11/04/07) 08106!00 SIDETRACKCOMPLETION 06/02/09 GLMITLH ADPERF(04/19/09) 03/10/02 RN/TP CORRECTIONS 06(20/02 MW/TLH PERF CORRECTIONS 05/05/05 JAF/TLH PERF (04/05/05} 10/27/07 JPKlTLH TVDCORRECTIONS PKR, ID = 3.875" PRUDHOE BAY UNR WELL N-10A PERMIT No: 2000860 API No: 50-029-20507-01 SEC 8, 711 N, R13E, 924' NSL & 536' EWL BP 6cploration (Alaska) SAFETY1a6TES: 70° @ 9306' & 90° @ 10347' ***4-1 /2" CHROME TBG"** 2197' ~-~ 4-112" HES X NIP, ID = 3.813" 25$8' I-~ 9-5(8" DV PKR -j4-1/2" HES X NIP, ID = 3,813" 8960' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 8992' 4-1/2" HES XN NIP, ID = 3.725" 9004' 4-1/2" WLEG, ID = 3.958" 9000' ELMD TT LOGGED 07/18/00 10101(09 Schiumher er NO. 5405 Alaska Data Consulting Services Company: State of Alaska 2525 Gambol! Street, Suite 400 Alaska Oil Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job Log Description Date EL Color CD K -11 AY1M -00033 SBHP SURVEY J,,- Na 09/12/09 1 1 L4 -30 AWL 8-00031 PRODUCTION PROFILE I 0 /1 08/06/09 1 1 P2 -31 AP30 -00045 LDL ^3 3 07/11/09 1 1 01.29 B6JE -00009 PRODUCTION PROFILE 08/11/09 1 1 J -22A B69K -00013 PRODUCTION PROFILE "JO i 08/30/09 1 1 W-44 B148-00071 INJECTION PROFILE (Me.. I. O /4 09/06/09 1 1 12-25 3581-00010 INJECTION PROFILE ,f 4 4 08/22/09 1 t 1 15 -33 AYKP -0005 1 SBHP SURVEY C j !0 09/01/09 1 1 P2-48 B69K -00015 SBHP SURVEY f 09/01/09 1 1 Z -28 B69K -00016 INJECTION PROFIL I" �3 I 'a'3 09/19/09 1 1 0-02A AP30 -00054 IBP /LDL 17 07/24/09 1 t 1 W-24 AWJ 00044 MEM INJECTION PROFILE( �n u 1 1 u Q `p8/15/09 1 1 V -03 B2NJ -00021 MEM PROD PROFILE a �F Q (S") J��}�j oa/25/09 09/03/09 1 1 H -148 B2WY -00026 MEM PROD PROFILE -4_I I 1 P1 -01 AY1M -00031 INJECTION PROFILE P1 -05 8581.00009 PRODUCTIONPROFIL 08/20/09 1 1 NK-10 B2WY -00023 MEM INJECTION PROFILE I Ll b Y 9 08/20 /09 1 08/22/09 1 1 13 -27A B2NJ -00019 MEMORY SCMT I (l. 1 08/13/09 1 1 W 18 -028 B2Y -00021 MEMORY SCMT N 3 i 69 ,.q P1 08/19/09 1 1 A NK -38A AYKP -00049 USIT pti4 L 1 08/17/09 1 1 06 -09 SWLB -00028 USIT '49 --O 5 07/30/09 1 1 13 -03A 09AKA0150 OH MWD/LWD EDIT S I�- Ita 7 f 1 R 07/06/09 2 1 C -188 B2NJ -00017 MCNL1 3t/l i7�L 08!09!09 1 1 1- 3510 -25 B69K -00011 RST t 08/26/09 1 1 04 -35A AXED -00025 MCNL ]A9 -Ag .Js 05/13/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Oata Consulting Services Petrolechnrcal Data Center LR2 -1 2525 Gamhell Street, SwIe 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 `,li of Yi 2 p=. 20 CS 411 4,7 ~~~ STATE OF ALASKA ~ SAY ~ ~ zQp,~ S/S.G~' ALA OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS :`~ias~ta Ai[ ~ Gas ~®~~ Cornm;ssiQn 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ Other Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory ~ Zoo-osso 3. Address: P.O. Box 196612 Stratigraphic Service ~°° 6. API Number: Anchorage, AK 99519-6612 50-029-20507-01-00 7. KB Elevation (ft): 9. Well Name and Number: 72.74 KB PBU N-10A 8. Property Designation: 10. Field/Pool(s): ADLO-028282 PRUDHOE BAY Field/ PRUDHOE OIL Poot 11. Present Well Condition Summary: Total Depth measured 10930 feet Plugs (measured) None true vertical 8740.53 feet Junk (measured) None Effective Depth measured 10846 feet true vertical 8744.2 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470 Liner 3393 7"29# L-80 5751 - 9144 5311 - 8529 8160 7020 Liner 1932 4-1/2" 12.6# L-80 8998 - 10930 8390 - 8741 8430 7500 Production 5886 9-5/8" 47# L-80 27 - 5913 27 -5440 6870 4760 Surface 2632 13-3/8" 72# L-80 28 - 2660 28 - 2660 4930 2670 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: = _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13Cr80 26 - 9005 0 0 - Packers and SSSV (type and measured depth) 9-5/8" DV Packer 2582 4-1/2" Baker S-3 Hydro Set Packer 8960 4-1/2" Baker ZXP Packer 8998 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 305 1345 366 269 Subsequent to operation: 339 1357 456 265 14. Attachments; 15. Well Class after proposed work: Copies of Logs and Surveys Run EXplOratOry ~ Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas WAG ~ GINJ r WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pr Title Data Management Engineer Signature Phone 564-4944 Date 5/8/2009 Form 10-404 Re ised 04/2006 (~ fdIAY ~ ~ ~~~~ ~S/3R Submit Original Only N-10A 200-086 PERF ATTACHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base N-10A 8/8/00 PER 10,345. 10,370. 8,796.74 8,795.87 N-10A 8/8/00 PER 10,495. 10,520. 8,781.27 8,777.51 N-10A 8/8/00 PER 10,705. 10,730. 8,752.66 8,750.73 N-10A 8/8/00 PER 10,820. 10,840. 8,745.42 8,744.44 N-10A 4/20/01 APF 10,739. 10,759. 8,750.15 8,748.93 N-10A 4/21/01 APF 10,010. 10,030. 8,766.04 8,767.37 N-10A 4/5/05 APF 10,155. 10,180. 8,776.12 8,778.79 N-10A 4/5/05 APF 10,590. 10,640. 8,766.63 8,760.3 N-10A 4/18/09 APF 9,880. 9 905. 8,756.35 8,758.6 N-10A 4/19/09 APF 9,805. 9,830. 8,744.89 8,749.32 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • i r N-l0A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY ~ 4/17/2009CTU #9 w/1.75" CT. Rig Up for Adperf. MIRU CTU, *** Continued on WSR 04/18/09 *** CTU #9 w/1.75" CT. Drift/Log for Depth Control. *** Continued from WSR 04/17/09 *** <InterACT publishing> Pertrom weekly BOP test. Makeup BHA #1 with PDS GR/CCL logging tools in carrier with 3.65" JSN. Load well with I 10 bbls of 50/50 meth, 160 bbls of 1 %KCI w/0.6% SafeLube and 30 bbls of 50/50 meth. Tag bottom at 10858' ctmd. RIH and logged up from 10850' to 9300'. At surface, confirmed good data. Correctrion of -24' referenced to SLB (MCNL/GR/CCL July 18, 2000. MU BHA #2 and RIH with 25' of 3.38" pert 1 gun. Correct depth at flag to top shot and pertorate from 9880' to ~$~5`. q~ POOH. At surface confirm all shots fired. MU BHA #3 and RIH with 25' of 3.38" pert guns. *** Job continued on WSR 04/19/09 *** ~~~~ Note: All pert guns loaded with PJ 3406 HMX charges, 6 SPF - 60 deg 4/19/2009CTU #9 w/1.75" CT. Adpert. *** Continued from WSR 04/18/09 *** <InterACT not publishing>RIH with BHA #3, pert gun run #2. Correct depth at flag to top ,shot and perforate from 9805' to 9830'. POOH. Bullhead additional 15 bbls of 50/50 meth. Well freeze protected to 3000' with 50/50 meth. At surtace, confirm all shots fired. RD CTU. Pressure test tree cap to 4,000 psi, good. Noti y D owe st~f1- atus. Move out CTU. *** Job complete *** FLUIDS PUMPED BBLS 198 50/50 METH 210 1 %KCI w/0.6% SAFELUBE 408 Total ~/EL~ LOS ~RANSM/TTAL ProActive Diagnostic ~e~rices, Inc< To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 L~ RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTn The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 Coil Flag 1) Coil Flag 1 50-02820507-01 2) Signed Print Name: 20-Apt~09 F-13A ~~ 1 f~~ - isa I~-~ ~~ EDE EDE 50-0282043401 Date : _ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (9071245-88952 E-MAIL : __ WEBSITE C.\Documents and SettingslOwner\Desktop\Transmit_BP.docx l (.? 09/23/08 Schlu~nberger N0.4903 Alaska Data & Consulting Services ~ `,~ . ~ f4~~ir c£ 1 ~~~;~ Company: State of Ataska 2525 Gambell Street, Suite 400 ~~;iv"`~c~+~~~~'` I Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wpll .Inh S ~ .... ne .,~:.. L-216 10687773 MDT - _ _ _ - - ~ _~ _ 05!09/04 v 1 v~ 1 L-204 11212880 MDT - a 07/24/06 1 1 14-22A 11999036 PPROF W/FLOW SCAN IMAGER / '~(0 08/17/08 1 1 H-11 12017507 USIT 08/09/08 1 1 D-22C 11963190 USIT - '~ ~ (Q 08/20/08 1 1 NK-10 12066549 MEM INJECTION PROFILE ,, G) _ ( / Q'~ 09/11/08 1 1 09-28A 12031499 RST - - OS/Ot/OS 1 1 N-10A 12005225 MCNL ~ ~ 08/20/08 1 1 05-23B 40016995 OH MWD/LWD EDIT 05/27/08 2 1 n~ cw~c wnvw~n.~n cnnr .-. ---..-.-.--..---~._ ..~...... ... • v..w. •.,~~a r~~~v •~~, v~~~~~l~~a v~~a.. vvr I L'/1V fl 1 V. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth Received by: ~ ~~ • • l~J 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D RECEiVE,O ALASKA OIL AND GAS CONSERVATION COMMISSION 2005 REPORT OF SUNDRY WELL OPERATIONS MAY 2 5 A\aska Oi\ & G8S co¡\~. COmm' Stimulate 0 Ot~E{{~ra~e WaiverD Time ExtensionO Re-enter Suspended WellO ) STATE OF ALASKA ) Repair WellO PluQ PerforationsD Pull Tubing 0 Perforate New Pool D Operation Shutdown 0 Perforate ŒJ 2. Operator Name: 3. Address: BP Exploration (Alaska), Inc. 4. Current Well Class: Development Œ] ExploratoryD 5. Permit to Drill Number: 200-0860 6. API Numbel 50-029-20507-01-00 P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 72.74 8. Property Designation: ADL-028282 11. Present Well Condition Summary: StratigraphicD ServiceD 9. Well Name and Number: N-10A 10. Field/Pool(s): PrU:CUw, . 'J~ ~% ~i~lC, d I prudhoe Oil Pool ~~\I'H'h::U MAY :G 'l 2005 Total Depth measured 10930 feet true vertical 8740.5 feet Effective Depth measured 10846 feet true vertical 8744.2 feet Plugs (measured) Junk (measured) None None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 28 108 28.0 108.0 1490 470 liner 3393 7" 29# L-80 5751 - 9144 5310.8 - 8529.2 8160 7020 liner 1932 4-1/2" 12.6# L-80 8998 - 10930 8390.4 - 8740.5 8430 7500 Production 5886 9-5/8" 47# L-80 27 - 5913 27.0 - 5440.2 6870 4760 Surface 2632 13-3/8" 72# L-80 28 - 2660 28.0 - 2660.0 4930 2670 Perforation Depth: Measured depth: 10010 - 10030, 10155 -10180, 10345 -10370, 10495 -10520, 10590 -10640, 10705 -10730, 10739 -10759 True vertical depth: 8766.04 - 8767.37,8776.12 - 8778.79,8796.74 - 8795.87,8781.27 - 8777.51,8766.63 - 8760.3,8752.66 - 8750.73 8750.15 - 8748.93 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 26 9005 Packers & SSSV (type & measured depth): 9-5/8" DV Packer @ 2582 4-1/2" Baker ZXP Packer @ 8998 4-1/2" Baker S-3 Hydro Set pa~eAf\U"ED MAY@~~ tJI 82Ô~~ 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: Oil-Bbl 631 577 Representative Dailv Averaae Production or Injection Data Gas-Met Water-Bbl Casing Pressure 1.2 437 1200 1.5 665 1100 Tubing Pressure 265 282 13 Copies of Logs and Surveys run _ Daily Report of Well Operations_ ~ 15. Well Class after proposed work: Exploratory 0 16. Well Status after proposed work: Oil [!] Gas D Development ŒJ Service D 14. Attachments: Signature Garry Catron Garry Catron J1~ WAG D GINJD WINJD WDSPLO Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Title Production Technical Assistant r~K~ Phone 564-4657 Date 5/20/05 Form 10-404 Revised 4/2004 -QH \ G\ N A·~ \ \ . \, J RBDMS BFL MAY 2 5 Z005 ") ) N-10A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 04/04/05 CTU #5, ADD PERF; MIRU. RIH WITH PDS MEM GR/CCL. LOG INTERVAL 10700' TO 10000'. FLAG PIPE AT 10638' CTM. POOH. TIE LOG INTO SWS MCNL/GR/CCL DATED 7-18-2000. MAKE +17' DEPTH CORRECTION. RIH WITH GUN #1 (25' - 2 7/811 PJ2906-HMX, 6 SPF). PERFORATE INTERVAL 10615' TO 10640'. POOH. ALL SHOTS FIRED. MU AND RIH WITH GUN #2 (25' - 2 7/811 PJ2906-HMX, 6 SPF). CONT' ON WSR 4/05/05 ... 04/05/05 Perforate 10155'-10180' 6 SPF, 10590'-10640' 6 SPF FLUIDS PUMPED BBLS 139 60/40 Methanal 139 TOTAL Page 1 TREE = 4" crvv WELLHEAD = FMC ) ÄCTUATÖR;' .'. OTIS KB. ELEV = 72.74' EiF'~'''E'lj~V'''';'''' . ..... . .. 4·4.68~ KOP = 3094' Eax'·Ang§~~~~~(~Li.~~.~~ Datum MD = 10437' Dé3tümTVO;;'" "m säöÖiss 113-3/8" CSG, 72#, L-80, ID = 12.347" l-i 2666' Minimum ID = 3.725" @ 8992' 4-1/2" HES XN NIPPLE TOPOF 7" LNR l-i 5751' ÆRFORA TION SUMMARY REF LOG: _? ON ? ANGLEATTOPÆRF: 86 @ 10010' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10010 - 10030 0 04/20/01 2-7/8" 6 10155 - 10180 0 04/05/05 2-7/8" 4 1 0338 - 1 0363 0 08/08/00 2- 7/8" 4 1 0488 - 1 0533 0 08/08/00 2-7/8" 6 1 0590 - 1 0640 0 04/05/05 2-7/8" 4 1 0699 - 1 0724 0 08/08/00 2" 6 10739 - 10759 0 04/20/01 2-7/8" 4 10813 - 10833 0 08/08/00 1 TOP OF WHIPSTOCK l-i 5913' I BRIDGE PLUG l-i 5939' I TOP OF CEMENT l-i 8818' N-10A ~ ~ ) SA...av NOTES: 700 @ 9306' & 900 @ 10347' 2197' 1-i4-1/2" HES X NIP, ID = 3.813" I - - ::::>--1 ~ GAS LIFT MANDRELS DEV TYÆ VLV LATCH 9 CAMCO DOME RK 38 CA MCO DOME RK 16 CAMCO DMY BK 14 CAMCO DOME BK 14 CAMCO DMY BK 15 CAMCO S/O BK PORT DATE 16 01/30/03 16 01/30/03 o 16 01/30/03 o 20 01/30/03 2588' l-i 9-5/8" DV PKR I ~ ST MD rvD 6 2992 2918 5 5355 4923 L 4 6508 5904 3 7357 6725 2 8076 7425 .. I 1 8837 8163 MILLOUT WINDOW 5913' - 5929' 8949' 1-i4-1/2" HES X NIP, ID = 3.813" I 8960' l.j 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 8992' 1.j4-1/2" HES XN NIP, ID = 3.725" I 9004' 1-i4-1/2" WLEG, ID = 3.958" I 9000' l-i ELMD TT LOGGED 07/18/00 9011' 1- 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 1 9-5/8" CSG, 47#, L-80, ID = 8.681" l-i 10042' 14-1/2" TBG, 12.6#, 13·CR·80, .0152 bpf, ID = 3.958" l-i I 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" l-i DA TE REV BY COMMENTS 05/05/05 JAF/TLH ÆRF (04/05/05) DATE 12122180 08/06/00 03/10/02 06/20/02 10/18/02 01/30/03 REV BY COMMENTS ORIGINAL COM PLErION SIDErRACK COM PLErION CORRECTIONS ÆRF CORRECTIONS GL V C/O GL V C/O RN/TP MW/TLH MH/KAK JCrvvTP 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" l-i 10930' I PRUDHOE BAY UNIT WELL: N-10A ÆRMIT No: "2000860 API No: 50-029-20507-01 SEC 8, T11 N, R13E, 924' NSL & 536' EWL BP Exploration (Alaska) MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc Permit to Drill 2000860 MD 10930 TVD DATA SUBMITTAL COMPLIANCE REPORT 9~9~2002 Well Name/No. PRUDHOE BAY UNIT N-10A Operator BP EXPLORATION (ALASKA) INC 8741 Completion Dat 8/6/2000/~ Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-20507-01-00 UIC N REQUIRED INFORMATION Mud Log N.__9o Sample No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type ~fllia Fmt Log Log Run Name Scale Media No Interval Start Stop (data taken from Logs Portion of Master Well Data Maint) OH I Dataset CH Received Number Comments T L ~~ L L D ~ ED D '¢h'~uction Log ~ Production 9878 FINAL MCNL/GPJCCL 5 FINAL LIS Verification FINAL MD ROP/GR/RES 2/5 FINAL TVD GR/RES 2/5 FINAL 9984 FINAL 1 25 BM 1 8800 10832 Case 5700 10869 ,-Gase~ 8800 10832 CH 8800 10832 CH 5908 10925 oh 5907 10925 oh 5700 10869 0 ~' 8910 10818 Case 8910 10818 Case 2/14/2001 3/16/2001 2/14/2001 2/14/2001 3/16/20O 1 3/16/2001 3/16/2001 3/16/2001 6/27/2002 6/27/2002 09878 "8~b0-10832 09984 ZS"'/~b-10869 9878~8800-10832 Digital Data 8800-10832 BL, Sepia LIS Verification Paper Copy 5908-10925 BL, Sepia 5907-10925.. BL, Sepia 9984,~00-10869 Digital Data 11010/.,,/''/ Well Cores/Samples Information: Name Interval Start Stop Sent Dataset Received Number Comments ADDITIONAL INFORMATION Well Cored? Y/~,~ Chips Received? Analysis R ~.n~.iv~.d ? Daily History Received? ~/N Formation Tops ~¢"~/N Comments: DATA SUBMtT't'AL CoNtPLtANCE REpORt' 91912002 EY, pLORATION (ALASKA~ INC APl No. 50.029-20507-01'00 operator BP UIC N Welt Name/NO. pRuDHOE BAY UNiT N ~i0A . . Current Status 1-OIL ~" ' Date; ~ ~ ,,.nI 2000860 __ comptet~On Statu 1 OiL ..... ~ permit to · tion Dar $/6/200u ~~ /' ~ ~ ~ ~~-- compliance Reviewe : WI LL LOG ItlS MITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC :33;3 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR;~-I 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT[SI OR CD-ROM FILM COLOR Open Hole I I 1 , , Res. Eval. CH I I 1 N-10A 6/17/02 Mech. CH 1 .... Caliper Survey Signed · Print Name: Date · = : ProActive Diagnostic Services, Inc., 310 K Street Suite 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~memorylog.com Website: www. mcmorvlo~com WULL LOG TRANSMi17'AL ProActive Diagnostic Services, Inc. To~ State of Alaska AOGr__~ 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution- Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(SI OR CD-ROM FILM COLOR Open Hole I I 1 ...... ,,, N-10A 6/17/02 Res. Eval. CH I I 1 Mech. CH 1 Caliper Survey Signed' ~_~ (~ O~ Date' Print Name: ProActive Diagnostic Services, Inc., 3 IO K Street Suite 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~memorylog.com Website: xvxvw.mcmorvlog.com To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 March 14,2001 MWD Formation Evaluation Logs · N-10A, AK-MM-00074 N-iOA: ~00'"O ~¢~ 2" x 5" MD Resistivity & Gamma Ray Logs · 50-029-20507-01 2" x 5" TVD Resistivity & Garmna Ray Logs · 50-029-20507-01 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY TRANSMITTAL LETTER TO THE ATI'ENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 OF THE A~aska 0it & Gas Cons, Commission Anchorage WELL LOG TRANSMITTAL To: State of Alaska March 09, 2001 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7t~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs N-10A, AK-MM-00074 1 LDWG formatted Disc with verification listing. AP1//: 50-029-20507-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 RECEIVED Date: MI!.~ I a~ 2001 Alaska Oil & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. Petro-Teclmical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 OF THE Sch berger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 928 Company: State of Alaska Alaska Oil & Gas Conservation Attn: Lisa Weepie · 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay 1/30/01 Color Well Job # Log Description Date Blueline Sepia Prints CD H-22A PSP PROD PROFILE/DEFT 010122 1 -/' 1 v' F-03 21012 RST-SIGMA 001225 1 ,/" 1 ,/ 1 N-10A 20322 MCNL 000718 1 ,/ 1 ,,' 1 "; D.S. 4-26 21019 CNTG 010106 1 / 1 =," 1 / D.S. 18-28 21008 RST-SIGMA 001222 1 /' 1 ~,' 1 ~/' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic BIvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Received b~ ~L~I~ ~_~1~ ~ ) Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 928 Company: State of Alaska Alaska Oil & Gas Conservation Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay 1/30/01 1 5' 1 15-o' Color Well Job # Log Description Date Blueline Sepia Prints CD IH-22A PSP PROD PROFILE/DEFT 010122 1 F-03 21012 RST-SIGMA 001225 1 N-10A 20322 MCNL 000718 1 ,/ 1 ,,' 1 "" D.S. 4-26 21019 CNTG 010106 I ,,' I ~," 1 ./" D.S. 18-28 21008 RST-SIGMA 001222 1 ;~ 1 ~,," 1 ~/' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Bird. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 Al-tN: Sherrie Received STATE OF ALASKA ~ ALASK/-. ~,LAND GAS CONSERVATION COMI, SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 200-086 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ~--'i~ 50-029-20507-01 4. Location of well at surface F'¥.-7:~';~'r"~;;;.:':~:"~ ~ ~~ , ~! 9. Unit or Lease Name 4356' SNL, 4742' WEL, SEC. 08, T11 N, R13E, UM I :%~,.~¥. ; Prudhoe Bay Unit At top of productive interval 518, SNL, 1666, WEL, SEC. 18, T11N, R13E, UM ! ~:~-ff~-i---~5~-- i 5220' SNL, 3046' WEL, SEC. 07, TllN, R13E, UM ..... N-10A 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE -- 72.74' ADL 028282 12. Date Spudded06/21/2000 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'7/3/2000 8/6/2000 115' Water depth' if °ffsh°reN/A MSL 116' NO' Of COmpletiOnsOne 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 10930 8741 FTI 10846 8744 FTI []Yes [] NoI (Nipple) 2197' MDI 1900' (Approx.) .., 22. Type Electric or Other Logs Run MWD, GR, RES 23. CASING, LINER AND CEMENTING RECORD CASING SEI-rlNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" x 30" Insulated Conductor Surface 110' 36" 11 cu yds Concrete 13-3/8" 72# L-80 36' 2666' 17-1/2" 4000 sx Arcticset II, 140 sx Top Job 9-5/8" 47# L-80 33' 5913' 12-1/4" 1255 sx Class 'G', 130 sx AS I 7" 26# N-80 5751' 9161' 8-1/2" 186 sx Class'G' 4-1/2" 12.6# L-80 8998' 10930' 6" 198 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 4 spf 4-1/2", 12.6#, NT 13Cr80 FOX 9005' 8960' MD TVD MD TVD 10345' - 10370' 8797' - 8796' 10495' - 10520' 8781' - 8778' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 10520' - 10540' 8778' - 8774' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10705' - 10730' 8753' - 8751' 10820'- 10840' 8745'- 8744' Freeze Protect with 155 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) August 8, 2000 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs'MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ,. ORIGINAL ::;-, .~ ,~- ..,~, :, · . Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests , , Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 9159' 8543' Shublik 9202' 8582' Tops of Sadlerochit / Zone 4 9399' 8669' 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~'/'~ ~,~~ Title Technical Assistant Date O~ '"~-q"(~ N- 10A 200-086 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ~ · · BP AMoCo Page 1 of 6 OperationS Summary Report Legal Well Name: N-10A Common Well Name: N-10A Spud Date: 11/18/1980 Event Name: DRILL+COMPLETE Start: 6/15/2000 End: Contractor Name: NABORS Rig Release: 7/6/2000 Group: DRK1 Rig Name: NABORS 9ES Rig Number: 9es iDate:' From- To HOurs 'Activity Codet Phase i Description of Operations 6/20/2000 00:00 - 01:00 ! 1.00, STWHIP LNR1 Commence Milling window from 5,913 ft to 5,919 ft. 01:00 - 02:30 ~i 1.50 STWHIP COND LNR1 'Skakers unable to handle Oil Wet Barite ( Mixing error at Mud Plant ~ when adding 3% lubricant). Change shaker screens. 02:30 - 04:00 ~ 1.50 STWHIP~ LNR1 Resume milling window to 5,919 ft. 104:00 - 05:00 i 1.00 STWHIP COND LNRI Change shaker screens again to 24's. 05:00 - 06:00 i 1.00~ STWHIP LNR1 Resume milling window to 5,921 ft 06:00 07:00 1.00~ STWHIP COND: LNR1 Circulate and condition mud. 07:00 11:30 4.50~ STWHIP i LNR1 Complete window milling from 5,921 to 5,943'. ( Window 5,913' to / ' ~. : 5,929') 111:30 - 13:00 1.50i STVVHIP : LNR1 :Sweep Hole clean and check window- good. , 13:00 - 17:30 4.50 ! STVVHIPi :LNR1 '. POOH and lay down BH^- Inspect Mills-in good shape and in gauge. 17:30 19:00 1.50i BOPSUR LNR1 . Flush BOP cavities and Function Rams. 19:00 - 21:00 [ 2.00!i STWHIP; !LNR1 :'Make Up Directional 8.1/2" BHA- Smith PDC and 1.25 deg FBH Motor. I ~ ~ ~ Orientate same. 21:00 - 00:00 I 3.00! S TVVHIP: LNR1 : RIH to 5745 picking up 108 singles of 4" drillpipe and surface cjecking I ! i i MWD 6/21/2000 00:00 - 01:30 1.501 STWHIP LNR1 'MADD Pass @ 260 fph fl 5,745' to above wi'ndow. !01:30 02:30 . 1.00i STWHIP 'LNR1 Orientate, take SCR's and drill ahead 6 ft of new Hole to 5,949'. 102:30 - 03:00 i 0.50 STWHIP: LNR1 Complete hole mud displacement with 9.6 ppg mud. 03:00 - 04:00 i 1.00 S'I-WHIP LNR1 Conduct LOT- 635 psi Surface Pressure @ 5,440' TVD = 11.85 ppg ! i .. EMW. 2.1 bbls Pumped, 1.8 bbls Returned. 04:00 - 08:30 4.50 DRILL · LNR1 ~ Sidetrack well to 6,022 ft. 108 30 09:30 1.00 DRILL LMWD i LNR1 !Troubleshoot MWD failure- complete Bottoms up and FC well. 09:30 13:30 4.00 DRILL ;LMWD ;LNR1 i POOH and inspect MWD- Pulsar Failure- Mechanical failure- not , . i i fluid/rig related. Download Tool and recover surveys. ! 13:30 - 15:30 2.00 DRILL : LMWD i LNR1 . Replace Pulsar and Upload MWD Tool- inspect Bit and BHA. 15:30 - 18:30 I 3.00 DRILL LMWD !LNR1 RIH, Orientate above Window. take SCR's and resume drilling i · operations. 18:30 - 20:00 I 1.50i DRILL :PROP LNR1 . Sharkers blinding off. Unable to progress ( Cold Mud @ shallow I ~ : depths). Change screen size. !20:00 - 00:00 4.00! DRILL : LNR1 i Directionally Drill 8.1/2" Hole. No Drag, No Losses. Sliding Iow of high i side. I i · · I I , Printed: 8/10/2000 11:24:18 AM op rati n summa Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date FrOm - To , N-10A N-10A DRILL+COMPLETE NABORS NABORS 9ES 6/15/2000 04:00 - 06:30 2.50 MOVE 06:30 - 09:30 3.00 MOVE Phase PRE COMM PRE 09:30 - 00:00 14.50 MOVE PRE 6/16/2000 00:00 - 02:00 02:00 - 09:00 2.00 MOVE PRE 7.00 MOVE SKID PRE 09:00 - 00:00 6/17/2000 00:00 - 03:00 15.00 MOVE PRE 3.00 MOVE PRE Start: 6/15/2000 Rig Release: 7/6/2000 Rig Number: 9es Spud Date: 11/18/1980 End: Group: RIG Description of Operations Move camp and pit module to main road. Outer right rear wheel of pit module driven off road edge on curve of pad access road. Repossition module and resume move Move camp and pits to N pad. Move sub base unit to main road using ng mats. Start transit to N pad via West Beach Road. Move sub module matting as required, Rear wheel drive unit sheared shaft in drive assembly. Trouble shoot and bypass. Continue move using front drive only. Matting road as required. Move sub module to location on plywooded road. 6/18/2000 6/19/2000 03:00 - 05:00 05:00 - 07:00 07:00 - 10:00 10:00- 14:30 14:30 - 15:00 15:00 - 17:30 17:30 - 19:30 19:30 - 00:00 00:00 - 03:00 03:00- 17:30 17:30 - 22:30 22:30 - 00:00 00:00 - 06:00 06:00 - 07:30 07:30 - 10:00 10:00- 13:30 13:30 - 14:30 14:30- 16:30 16:30- 21:00 21:00 - 22:00 2.00 MOVE 2.00 MOVE 3.00 RIGU 4.50 WHSUR 0.50 WHSUR 2.50 PULL 2.00 PULL 4.50 BOPSUR 3.00 BOPSUR 14.50 PULL 5.00 WHSUR 1.50 STWHIP 6.00 CLEAN 1.50 CLEAN 2.50 CLEAN 3.5O STWHIP 1.00 STWHIP 2.00 STWHIP 4.50 STWHIP 1.00 STWHIP PRE Lay rig mats and spot rig over well N-10. PRE Lay herculite and berm rig. Spot, line and berm pits. Spot camp and shop. PRE PJSM. Inspect, raise and pin derrick. NU pump choke and kill lines. RU floor and cellar. ACCEPT RIG @ 10:00 06/17/00 DECOMP NU lines to tree and test. Replace leaking outer annulus valve. Test to 3500 psi.. Check well. No pressure on annulus. NU DSM lubricator and pull BPV, RD DSM. DECOMP Held pre -spud / pre- job safety meeting w/NAD crew< TP and SSD foreman. DECOMP Reverse circ. Diesel from tubing. Circ .long way to recover diesel from annulus. Circ 1 complete volume to clean up well to seawater. DECOMP RU DSM lubricator and install TWC. Test from below to 1000 psi. RD tree and send for service. DECOMP Nipple up BOP and test. Test gas alarms, flow-show and PVT alarms. DECOMP Test BOPE. Test Annular, rams, choke and kill valves and manifolds, :standpipe and top drive valves to 250/3500 psi. Test witnessed by Jeff i Jones AOGCC. DECOMP RU landing joint and BOLDS. Pull tubing free wi 140K block weight. ( NO overpull) Pull and lay out 219 jts 4.5", 12.6#, 13-CR, TDS tubing and 18.91" cut off joint: 3 GLM, SSSV Mandrel, 2000' dual 1/4" ss control line, 6 SS bands and 25 clamps. RD tubing tools and clear floor. DECOMP Pull 9 5/8" x 13 3/8" Packoff w/36K OP. Large ammounts of Injected plastic sealant on both inside and outside of PO. Flush packoff bowl w 1" wash pipe. Run and PO. New PO too tall. Pull and remove spacer ring. Rerun and RILDS. Failed test. Tighten Gland nuts> Still leaking.Tighten LDS and GN and test OK to 5000 psi. LNR1 Run Wear ring. MU Whipstock milling assembly :Bottom mill, 8"mill, 8.5" mill, 1 jt HWDP,Bumper jar, 9 dc, 18HW, XO LNR1 Run in wi BHA #1 (milling assembly) to 6029'. LNR1 PU = 165K; SO = 145K; Rot = 150K @ 30 rpm & 4K ftlb. Pump hi-vis sweep and CBU w/1125 psi @ 483 gpm. LNR1 POOH and stand back mills LNR1 RU SWS and run CCL/GR 6070' to 5800'. MU HES 9 5/8" EZDril BP. RIH & correlate to SWS DIL-LL 12-04-80. Set top of BP at 5939' POOH and RD e-line. LNR1 Pressure test 9 5/8" casing and BP to 3000 psi for 30 min. LNR1 MU BHA #2 BOT Bottomset whipstock/mill assembly. Orient tools. LNR1 RIH @ 90 sec./std w/4" stands. Function check MWD at 2000'. LNR1 Tag BP @ 5938" DPM. Orient to 82 Deg. Left of Highside and set whipstock w/48K. Pull to Neutral Point and rotate free. Printed: 8/10/2000 11:24:18 AM Legal Well Name: N-10A Common Well Name: N-10A Event Name: DRILL+COMPLETE Contractor Name: NABORS Rig Name: NABORS 9ES Date t From-To HoUrs IActivity Code Phase 6/19/2000 22:00 - 00:00 2.00 STWHIP LNR1 6/22/2000 00:00 - 13:00 13.00 DRILL LNR1 13:00- 14:00 1.00 DRILL CIRC LNR1 14:00 - 23:00 9.00 DRILL LNR1 Start: 6/15/2000 Rig Release: 7/6/2000 Rig Number: 9es 6/23/2000 23:00 - 00:00 1.00 DRILL LNR1 00:00 - 01:00 1.00 DRILL LNR1 01:00 - 02:00 1.00 DRILL LNR1 02:00 - 03:30 1.50 DRILL LNR1 03:30 - 10:30 7.00 DRILL LNR1 10:30- 12:00 1.50 DRILL LNR1 6/24/2000 12:00- 16:00 4.00 DRILL LNR1 16:00 - 00:00 8.00 DRILL LNR1 00:00 - 01:00 1.00 DRILL LNR1 01:00 - 03:00 2.00 DRILL LNR1 03:00 - 00:00 21.00 DRILL LNR1 STAB LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 6/25/2000 00:00 - 19:00 19.00 DRILL 19:00 - 21:00 2.00 DRILL 21:00 - 22:30 1.50 DRILL 22:30 - 00:00 1.50 DRILL 6/26/2000 00:00 - 01:30 1.50 DRILL 01:30 - 04:00 2.50 DRILL 04:00 - 04:30 0.50 DRILL 04:30 - 07:30 3.00 DRILL 07:30 - 09:30 2.00i DRILL 09:30 - 11:30 2.00 DRILL 11:30 - 13:00 1.50 CASE 13:00 - 19:30 6.50 CASE LNR1 :LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 19:30 - 20:30 1.00 CASE Spud Date: 11/18/1980 End: Group: RIG Description of Operations PUMP 40 13BL fresh water, 35 bbl HI-Vis and displace to 9.6 ppg LSND Mud. Directionally Drill 8.1/2 Hole to 6,732 ft. No Drag, No losses. SCR Problems with Blower Motor to Mud Pumps- Trouble shoot same and resolve. Directionally Drill 8.1/2" Hole f/6,732 ft to 7,199 ft. Mud weight raised to 10.2 ppg. ECd tracking 0.6 ppg over MW. No Drag. No Losses. Sweep Hole while working/rotating pipe. Number 2 pump swab failure @ tail end of circulating. Complete circulation on one pump @ 6.5 BPM. Sweep Hole Clean. Number 2 pump failed towards end of BU. Complete Circulation @ 6.5 BPM Make Check Trip back to window- No problems. Set RTTS 44 ft below Rotary, Bit @ 5,757ft. Pressure test to 1000 psi- good. Blow Down Lines and empty Pits. Nordic 1 Break thru Road resulting in extra standby time for Rig. Inspect and overhaul the liners/valves and wswabs on number 2 pump. Slip and Cut 60 ft Drillline. With Rig In Shut down mode conduct Safety Meeting with crews to discuss topical Subjects- New Activity, Summer Moves and new people. Resume work on Mud Pumps. Inspect TopDrive and Drawworks. Nordic making Progress- Disconnect Lines and move Pit Complex/Sub off N-10a.AIIow Nordic 1 to pass. Move Su Back on well. Connect Lines. Test Choke and Kill Lines to 3500 psi. Take on fluids. Recover RTTS and Lay out same. Break Circulation @ window (5,929') and RIH- hole in good shape. Wash last stand to bottom staging up pumps to drilling rate watching ECD Directionally drill 8.1/2" hole f/7,300 ft to 8,417' reaming each stand. No Drag, no losses. Drilling with 200 psi Differential w/P-rates of 90-130 fi/hr. ECD climbs to 11.0 ppg and reduces to 10.8 ppg after each connection when cuttings are cleaned f/hole @ connection. Directionally Drill 8.1/2" Hole f/8,417 ft to 9,161 ft. Hole in Good shape- no drag, no losses. Observe Cap in Drilling Parameters @ 9,158 ft. Circulate Bottoms Up for Samples- Sst observed. Shale Splinters observed on shakers and not cleaning up. Raise Mud weight to 10.4+ ppg and rack back a stand. Make check trip to old hole. No drag- Hole in Good Shape. RIH- No drag- Hole in Good Shape. Wash down last Stand and Stage up Pumps gradually watching ECD. Sweep hole @ 12 BPM/3300 psi. Shale returns clean up after two bottoms up. reciprocate and rotate @ 80 RPM. Spot a 150 bb110.6 ppg Liner Pill and pump dry job. POOH to window- No drag- hole in good shape. Drop ESS @ 6,638 ft. POOH to BHA.( Drop 2.1/2" Hollow rabbit) Lay down MWD, Motor and Bit- Recover ESS and Rabbit. Bit in good shape. Clear Rigfloor. R/U to run 7" Liner. Hold PJSM Run 7" Liner- 84 joints, L-80, BTC-Mod, 26 lb/ft. L/O 6 joints due to M/U beyond triangle. M/U hanger and one stand. Circulate 150 bbls @ 7 BPM/400 psi. Up/Down weight 110 klbs. Printed: 8/10/2000 11:24:18 AM Legal Well Name: N-10A Common Well Name: N-10A Event Name: DRILL+COMPLETE Contractor Name: NABORS Rig Name: NABORS 9ES Date From-To Hours iActivity Code Phase 6~26~2000 20:30 - 00:00 3.50 CASE LNR1 6~27~2000 00:00 - 01:30 1.50 CASE LNR1 01:30 - 04:30 3.00 CEMT LNR1 6/28/2000 6/29/2000 04:30 - 05:30 1.00~ CEMT LNR1 05:30 - 07:00 1.50: CEMT LNR1 07:00 - 10:30 3.50 i CEMT LNR1 10:30 - 13:00 2.501 BOPSUR LNR1 13:00- 14:30 1.50i BOPSUR PROD1 14:30- 18:00 3.50 DRILL PROD1 18:00- 19:00 1.00~ DRILL PROD1 19:00 - 20:30 1.50 DRILL PROD1 20:30 - 21:30 1.00 DRILL PROD1 21:30 - 22:30 1.00 DRILL PROD1 22:30 - 00:00 1.50 DRILL PROD1 00:00 - 02:00 2.00 DRILL PROD1 02:00 - 03:00 1.00 DRILL PROD1 03:00 - 05:00 2.00 DRILL PROD1 05:00 - 05:30 0.50 DRILL PROD1 05:30 - 06:00 0.50 DRILL PROD1 06:00 - 09:30 3.50 DRILL PROD1 09:30- 10:30 1.00 DRILL PROD1 10:30- 14:30 4.00 DRILL PROD1 14:30 - 18:30 4.00 DRILL PROD1 18:30- 19:30 1.00 DRILL PROD1 19:30 - 20:00 0.50 DRILL PROD1 120:00 - 20:30 0.50 DRILL ; PROD1 20:30 - 00:00 3.50 DRILL PROD1 00:00 - 09:30 9.50 DRILL PROD1 09:30 - 11:00 1.50 DRILL PROD1 11:00 - 11:30 0.50 DRILL PROD1 11:30- 13:30 2.00 DRILL PROD1 13:30 - 16:30 3.00 DRILL PROD1 16:30- 18:30 2.00 DRILL PROD1 18:30- 19:30 1.00 DRILL PROD1 Start: 6/15/2000 Rig Release: 7/6/2000 Rig Number: 9es Spud Date: 11/18/1980 End: Group: RIG Description of Operations RIH Breaking Circulation @ Window. Run 7" Liner to bottom. No resistance. Wash down last 15 ft @ 2 BPM/ 380 psi and tag on depth. Stage Pumps up gradually up to 6 BPM/1000 psi until Bottoms Up. No shale seen over shakers. Hold PJSM and Btach mix Cement while conditioing hole. Keep open hole volume < 2 BPM and then staged up pumps. Pump 10 bbls 11.1 ppg Spacer. Test Lines.pump 20 bbls B45 Spacer and 39 bbls Cement @ 15.8 ppg, 185 sx, 1.15 ft3/sk. Drop Dart. Displace wi 5 bbls water and 179 bbls Mud. Observe wiper shear. Bump Plugs @ 96.6% Pump Efficiency. Displace @ 6 BPM, Bump @ 3 BPM/800 psi. Check Floats OK. Check hanger Set- OK. S/O 45 klbs and observe Liner Top Packer Shear. CBU @ 12 BPM/2000 psi- No cement or spacer observed. POH and L/D running tool. Clear Rigfloor and remove wear ring. R/U and Test BOPE to 300/3500 psi- AOGCC waived witness of Test. R/D Test Equipment. M/U Cleanout Assembly (#5) RIH to 8,590 ft. Observe TOL @ 5,751'. Wash down and tag Firm cement @ 9,035' ( 43' above L/C) Sweep Hole Clean Test Casing and Liner to 300/3000 psi while holding a Pre-Reservoir Meeting with Crews. Conduct a Stripping Drill w/200 psi on casing. Drill Medium to soft Cement down to Landing collar @ 9,078'. Drill Medium Hard Cement @ 3-4 Klbs WOB @ 80 ft/hr- firmed up 10 ft from shoe. Drill 2 ft new hole. Sweep Hole clean of cement @ 10 BPM/3300 psi Displace Hole to 8.3 ppg Quikdrill system. Flowcheck well with lower Mudweight while cleaning out below the shakers and possum belly. Service Top Drive POOH to BHA laydown BHA and grade bit. Make up Smith Explorer Bit and 2.75 deg FBH w/7/8 Lobe, 2.2 stage. Check Orientation. Surface test. RIH to 9,132'. No problems going thru Liner Top @ 5,751ft. Directionallt Drill 6.1/8" Hole 20 ft new hole. Circulate Hole Clean Conduct FIT to 9.7 ppg EMW, 610 psi Surface Pressure. 1.1 bbls Pumped/returned. Slide Drill 6.1/8" Hole Slide Drill 6.1/8" Hole f/9,224 ft to 9,334'. Achieving high doglegs ( 36-40 degs DLS). Ream each stand. No Drag No Losses. Sweep Hole clean @ 220 GPM/1350 psi and Flowcheck. Backream to 7" Shoe @ 9,161 ft. No Drag. Slip and Cut 94 ft drilline. Service Drawworks. POOH to BHA. Lay down High Bend Motor- Inspect Bit, 1/16" Undergauge. Download MWD. M/U New Explorer Bit and 1.5 Deg ABH Motor w/7/8 lobe, 2 stage. No Resistivity. Place Jars 390 ft behind bit so when BHA run is complete Printed: 8/10/2000 11:24:18 AM Legal Well Name: N-10A Common Well Name: N-10A Event Name: DRILL+COMPLETE Contractor Name: NABORS Rig Name: NABORS 9ES Date From - To HoUr~-:I: 'Activity C°del Phase 6/29/2000 18:30- 19:30 1.00 DRILL PROD1 19:30 - 00:00 4.50 DRILL PROD1 6/30/2000 00:00 - 01:00 1.00 DRILL PROD1 01:00 - 13:00 12.00 DRILL PROD1 7/1/2000 7/2/2000 7/3/2000 7/4/2000 13:00- 15:30 2.50 DRILL PROD1 15:30- 18:30 3.00 DRILL PROD1 18:30 - 21:00 2.50 DRILL PROD1 21:00 - 00:00 3.00 DRILL PROD1 00:00 - 05:00 5.00 DRILL PROD1 05:00 - 07:00 2.00 DRILL PROD1 07:00 - 00:00 17.00 DRILL PROD1 00:00 - 00:00 24.001 DRILL PROD1 00:00 - 06:00 6.001 DRILL PROD1 06:00 - 08:30 2.50 DRILL PROD1 08:30- 13:30 5.00 DRILL PROD1 13:30 - 15:00 1.50 DRILL PROD1 15:00 - 16:00 1.00 DRILL PROD1 16:00- 18:30 2.50 DRILL PROD1 18:30 - 20:00 1.50 DRILL PROD1 20:00 - 22:30 2.50 DRILL PROD1 22:30 - 00:00 1.50 DRILL PROD1 00:00 - 02:00 2.00 DRILL PROD1 02:00 - 03:00 1.00 CASE COMP 03:00 - 06:30 3.50 CASE COMP 06:30 - 07:00 0.50 CASE COMP 07:00 - 13:00 6.00 CASE COMP 13:00 - 13:30 0.50 CASE COMP 13:30 - 16:30 3.00 CASE COMP 16:30 - 17:45 1.25 CASE COMP Spud Date: 11/18/1980 Start: 6/15/2000 End: Rig Release: 7/6/2000 Group: RIG Rig Number: 9es · Description of Operations Jars will not be in High DLS. RIH to 9,161 ft Picking up 48 joints of 3.1/2" Drillpipe. RIH and wash down to bottom f/9,325 ft. Take SCR's and prepare to drill ahead. Directionally Drill 6.1/8" Hole fl 9,334 to 9,543 ft. No Drag, No Losses. Out of Schublick @ 9,402 ft, 8,657 ft TVD- P-rates pick up f/10 ft/hr to 50 ft/hr. No problems sliding. Sweep Hole clean and Flowcheck. Prepare to POH to pick up Resistivity now well has soft landed. POOH to BHA L/D Jars and download MWD- Lay out bit. M/U BHA #8 with Resistivity LWD and New Hughes EP bit. Pick up Dailey Jars ( Apparently more resistant to high doglegs than HE jars) RIH to 9,156" checking MWD @ 2700 ft- OK. MADD pass from 9,156 ft to 9,543'. Some resistance between 9,200' to 9,330'. Directionally Drill 6.1/8" Hole f/9,543' to 10,045 ft. No Drag, No losses. Sliding Good. ECD Holding Steady @ 9.0-9.1 ppg. No Indication of first two faults. Directionally Drill 6.1/8" Hole fl 10,045' to 10,700. No Drag, No Losses. ECD staying below 9.2 ppg. High Resistivity Readings from LWD for lateral section. No problems sliding. Rotate thru Shale stringers. Directionally Drill 6.1/8" Hole f/10,700 ft to TD @ 10,930 ft ( End of Geological Polygon). No Drag, No losses. Sweep Hole Clean @ 220 GPM/1500 psi. Spot Open hole lubetex pill to help with MADD pass. POOH @ 450 ft/hr to make MADD pass back to 9,307 ft. Scope Change as MADD pass extra to well plan and run to investigate invasion properties and verify high Resistiviy readings over sections of Lateral. Slip and Cut 68 ft Drilline. Service Top Drive and Drawworks. RIH. Precautionary wash down to 10,780 ft and stage up pumps watching ECD. Hole in good shape. Sweep Hole @ 220 GPM/1500 psi and spot liner pill. Pump Dry Job and drop 2.375" Hollow rabbit POOH to 7" Shoe @ 9,161'. Hole in good shape. 2-5 Klbs o/pull in high doglegs and shale stringers. POOH w/4" Drillpipe L/D 3.1/2" HWDP and work BHA. LD BHA. Download MWD data. LD MWD, motor, and bit. :.Clear floor and RU 4.5" liner running tools. Hold PJSM. iRun 4.5" production liner: FS; I jr. 4.5", 12.6 #, LB0, IBT casing; FC, 1 i jr.; LC; 45 jts. casing; HMC hanger; ZXP packer. Circulate 50 bbl and RD casing tools. RIH on DP to 8918' MU cementing head. Circ and condition at 6 BPm and 670 psi.before entering open hole. RIH to 10915'. MU cement head and wash to bottom w/6 BPM and 970 psi. Work pipe and batch mix cement. PU = 190 K. SO -- 150 K. PJSM. Pump 10 bbl water pre flush. Test lines to 4500 psi. Pump 40 bbl. 9.0 ppg B45 spacer & 54 bbl 15.8 ppg cement. Flush line and drop dart. Displace w/60 bbl Perforation pill & 55 bbl sea water at 6 bpm. Did not see dart latch. Bumped plug at calculated displacement w/full returns. CIP @ 17:45 07/04/00 Printed: 8/10/2000 11:24:18 AM Page 6 of 6 Legal Well Name: N-10A Common Well Name: N-10A Event Name: DRILL+COMPLETE Contractor Name: NABORS Rig Name: NABORS 9ES 7/4/2000 17:45 - 18:00 0.25 CASE COMP 7/5/2000 18:00 - 20:00 2.00 CASE COMP 20:00 - 00:00 4.00 CASE COMP 00:00 - 04:30 4.50 CASE COMP 04:30 - 06:30 2.00 RUNCOM COMP 06:30 - 07:00 0.50 RUNCOM COMP 07:00 - 22:30 15.50 RUNCOM COMP 22:30 - 00:00 1.50 RUNCOM COMP 00:00 - 01:00 1.00 RUNCOM COMP 01:00 - 06:00 5.00 RUNCOM COMP 06:00 - 07:30 1.50 RUNCOM COMP 07:30 - 12:00 4.50 BOPSUR COMP 12:00 - 13:30 1.50 WHSUR COMP 13:30- 16:30 3.00 WHSUR TREE COMP 16:30 - 19:00 2.50 WHSUR COMP 19:00 - 22:00 3.00 WHSUR COMP 7/6/2000 Spud Date: 11/18/1980 Start: 6/15/2000 End: Rig Release: 7/6/2000 Group: RIG Rig Number: 9es . Description of Operations Pressured to 3200 psi to set hanger. Weight tested hanger to 30 K. Pressured to 4200 psi to set packer. Saw shear at 3900 psi. Bleed off and checked floats. Released from packer and unstung w/1000 psi. DP pressure. Circulate at 10 bpm. Recovered 2 bbl cement and ~75 bbl cement cut seawater. Circulated to 40 NTU sea water. LD cement head and POOL laying down DP. POOH and LD drill pipe. Clear floor, pull wear bushing and RU tubing tools. Pressur test casing to 500/3000 psi. Lost 50 psi in 30 min. Run 202 jts 4.5 ", 12.6#, 13-Cr, Fox completion tubing w/WLEG, XN nipple, BOT S-3 Packer, X nipple, 6 ea. GLM, & X nipple PU space out joint and sting into PBR. No pressure increase observed before stackout. Work rotation and confirm tag at top and bottom of PBR. LD Space out joint and MU spaceout pup and tubing hanger. MU hanger and check land tubing w/140 K. SO. and 120 K. PU. Reverse circ. to clean SW w/432 bbl. Spot 252 bbl Corexit treated SW in annulus and follow w/118 bbl SW. Land tubing and RILDS. LD landing joint and set TWC. Test to 1000 psi from above. Pull mouse hole and bell nipple. Pull rams and clean cavitys. ND and set back BOP. NU adaptor flange and tree. Test adaptor to 5000 psi. Test Tree. No Go. Pull TWC wi DSM lubricator. Check & clean TWC sand from TWC. Rerun and test w 5000 psi. Pull TWC. Drop ball-rod RU HB&R and test lines to 4000 psi. PJSM. Pressure tubing to 3500 psi. Packer sheared at 1500 psi. Held 30 min. test 30 psi loss. Bleed tubing to 1500 psi and pressure annulus to 3000 psi for 30 min test. 30 psi loss. Bleed tubing and shear RP valve. Reverse circulate 155 bbl diesel freeze protection. U - tube diesel to tubing. RD Lines. Install BPV and secure tree. RELEASE RIG AT 22:00, 7/6/00 Printed: 8/10/2000 11:24:18 AM Well: N-10A Accept: 06/17/00 Field: Prudhoe Bay Spud: 06/21/00 APl: 50-029-20507-00 Re lease: 07/06/00 Permit: 200-086 Rota~ Unit: N-9ES Date PRE-RIG WORK 06/06/00 Killed well with 221 bbls KCL water, tagged TD and corrected +30 to last tag at 10130'. Laid in 29 bbls cement from bottom, holding 700 psi. PU to WCTOC and squeezed at 1000 psi. Held for 15 min, eased out of hole, freeze protecting well to 2000' w/MeOH. Left 580 psi on well. Estimated cement top at 9057'. 06/07/00 Tag top of cement w/3.25" swage at 8770' SLM - Drift w/3.75" swage to 7500' SLM - Pull #3 DGLV - RDMO. 06/08100 MIRU SWS Unit #2150. Well currently S/I. RIH. Tie-in to gas mandrel. TD at 8818' MD. Shot Chemical Cuter at 8755' MD first full joint above TD. POOH. Cannot pull tool beyond the SSSV. Chemical cutter anchor sub held up on Sub Surface Safety nipple. Increased pressure to the tubing which equalized the difference across the anchor sub, and with a bit of jerking, successfully pulled the tool past the SSSV. POOH. Validate successful cut. RDMO. POST-RIG WORK 08/06/0O Perforated 20' interval (10820'- 10840') using 20' 2-7/8" Powerjet gun. Spotted 20 bbls of Flopro at 10800'. 08/07/OO Perforated two intervals (10705'- 10730', 10520'- 10540'). Made two gun runs with 2-7/8" Powerjet guns. Left well shut in after completing for additional perforating. 08/08/00 Perforated two 25' intervals (10345' - 10370', 10495'- 10520') with 2-7/8" Powerjet guns. Well was shot shut-in per engineering recommendation and turned over to Production at completion of job. North Slope Alaska Alaska State Plane 4 PBU_ WOA N Pad N-IOA Surveyed: 20 June, 2000 SURVEY REPORT 22 July, 2000 Your Ref: API-500292050701 Surface Coordinates: 5966828.26 N, 634406.06 E (70° 19' 02.3357" N, Kelly Bushing: 72.74ft above Mean Sea Level 148° 54'37. 7792" W) sper,r =sun 13 F~ I L L I N ~ Fii~ FI V I ~ ~, s Survey Ref: s vy9888 Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Measured Depth (ft) Incl. 5894.44 5913.00 5925.14 5964.14 5990.37 6021.27 6051.51 6083.06 6114.51 6147.43 6179.05 6205.43 6237.28 6269.30 6299.62 6334.15 6365.53 6394.72 6428.80 6487.99 6578.73 6672.08 6766.47 6858.53 6951.72 37.030 37.020 37.440 36.790 36.500 35.700 33.550 31.090 29.520 27.380 24.260 21.240 18.380 16.620 16.410 16.250 16.140 16.000 16.270 16.180 15.930 15.710 15.370 15.060 15.140 Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (it) (ft) 238.398 5352.60 5425.34 855.10 S 1275.33W 238.450 5367.42 5440.16 860.95 S 1284.85W 238.440 5377.08 5449.82 864.79 S 1291.11W 238.420 5408.18 5480.92 877.11 S 1311.16W 238.410 5429.23 5501.97 885.31S 1324.50W 238.400 5454.19 5526.93 894.85 S 1340.01W 238.380 5479.08 5551.82 903.86 S 1354.64W 238.360 5505.74 5578.48 912.70 S 1369.00W 238.340 5532.89 5605.63 921.03 S 1382.51W 238.310 5561.83 5634.57 929.26 S 1395.85W 238.280 5590.29 5663.03 936.50 S 1407.57W 238.250 5614.61 5687.35 941.87 S 1416.25W 238.210 5644.58 5717.32 947.55 S 1425.42W 238.170 5675.11 5747.85 952.62 S 1433.60W 236.130 5704.18 5776.92 957.30 S 1440.84W 237.420 5737.32 5810.06 962.62 S 1448.96W 237.300 5767.46 5840.20 967.34 S 1456.33W 236.450 5795.50 5868.24 971.75 S 1463.10W 235.120 5828.24 5900.98 977.08 S 1470.93W 234.400 5885.07 5957.81 986.62 S 1484.44W 233.250 5972.28 6045.02 1001.43 S 1504.70W 233.470 6062.09 6134.83 1016.62 S 1525.12W 232.570 6153.03 6225.77 1031.83 S 1545.32W 231.880 6241.86 6314.60 1046.63 S 1564.42W 233.930 6331.84 6404.58 1061.27 S 1583.78W Dogleg Rate (°/100ft) Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) 5965950.47 N 633146.25 E 1440.22 5965944.45 N 633136.83 E 0.177 1450.85 5965940.49 N 633130.64 E 3.460 1457.84 5965927.82 N 633110.82 E 1.667 1480.22 5965919.38 N 633097.63 E 1.106 1495.10 5965909.56 N 633082.29 E 2.589 1512.41 5965900.30 N 633067.83 E 7.110 1528.75 5965891.20 N 633053.62 E 7.797 1544.78 5965882.63 N 633040.27 E 4.992 1559.87 5965874.16 N 633027.07 E 6.501 1574.77 5965866.71 N 633015.49 E 9.867 1587.86 5965861.19 N 633006.91 E 11.448 1597.55 5965855.35 N 632997.84 E 8.980 1607.80 5965850.13 N 632989.75 E 5.497 1616.95 5965845.32 N 632982.59 E 2.034 1625.08 5965839.86 N 632974.57 E 1.148 1634.22 5965835.01 N 632967.28 E 0.366 1642.49 5965830.47 N 632960.60 E 0.938 1650.10 5965825.01 N 632952.86 E 1.343 1658.97 5965815.22 N 632939.53 E 0.372 1674.33 5965800.05 N 632919.54 E 0.446 1697.50 5965784.50 N 632899.39 E 0.244 1720.91 5965768.93 N 632879.47 E 0.442 1744.11 5965753.80 N 632860.64 E 0.390 1766.15 5965738.81 N 632841.54 E 0.579 1788.40 Comment Tie-on Survey Window Point MWD Magnetic Continued... 22 July, 2000 - 20:43 -2- DrillQuestl.05.04e Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Measured Depth (ft) Incl. 7046.16 7142.14 7232.30 7327.44 7419.22 7513.65 7608.27 7702.88 7795.60 7889.31 7982.56 8076.40 8169.71 8263.41 8356.29 8450.05 8544.13 8638.60 8732.61 8825.1 o 8917.42 9o10.53 9040.85 91o0.99 9160.92 14.370 14.16o 14.15o 13.590 13.13o 12.92o 12.41o 11.630 13.540 13.63o 13.47o 13.54o 13.230 13.240 13.630 14.750 14.880 · 14.570 14.33o 14.8oo 16.62o 17.580 17.940 17.850 19.210 Azim. 236.010 234.950 235.04O 235.240 234.660 234.050 235.480 235.880 234.410 234.210 234.160 232.990 231.660 232.030 230.290 234.090 237.120 235.830 235.220 235.370 233.940 233.460 232.860 232.260 235.150 Sub-Sea Depth (ft) 6423.16 6516.18 6603.60 6695.97 6785.27 6877.27 6969.58 7062.12 7152.61 7243.70 7334.35 7425.60 7516.37 7607.58 7697.92 7788.82 7879.77 7971.14 8062.18 8151.70 8240.56 8329.56 8358.43 8415.66 8472.48 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (fi) (ft) (fi) (ft) (ft) 6495.90 6588.92 6676.34 6768.71 6858.01 6950.01 7042,32 7134.86 7225.35 7316.44 7407.09 7498.34 7589.11 7680.32 7770.66 7861.56 7952.51 8043.88 8134.92 8224.44 8313.30 8402.30 8431.17 8488.40 8545.22 1075.08 S 1603.46W 1088.48 S 1622.95W 1101.13 S 1641.01W 1114.16 S 1659.72W 1126.34 S 1677.09W 1138.74 S 1694.38W 1150.71 S 1711.32W 1161.83 S 1727.59W 1173.39 S 1744.16W 1186.23 S 1762.03W 1199.01S 1779.75W 1212.02 S 1797.38W 1225.22 S 1814.48W 1238.48 S 1831.35W 1252.01 S 1848.15W 1266.07 S 1866.32W 1279.65 S 1886.16W 1292.91 S 1906.18W 1306,19 S 1925.52W 1319.43 S 1944.64W 1333.91S 1965.02W 1350.12 S 1987.08W 1355.66 S 1994.48W 1366.90 S 2009.16W 1378.15 S 2024.51W Dogleg Rate (°/100ft) 5965724.65 N 632822.11 E 5965710.90 N 632802.86 E 5965697.93 N 632785.03 E 5965684.56 N 632766.56 E 5965672.08 N 632749.41E 5965659.37 N 632732.34 E 5965647.09 N 632715.62 E 5965635.69 N 632699.55 E 5965623.84 N 632683.19 E 5965610.68 N 632665.55 E 5965597.58 N 632648.07 E 5965584.25 N 632630.67 E 5965570.75 N 632613.81E 5965557.20 N 632597.18 E 5965543.36 N 632580.62 E 5965528.98 N 632562.71 E 5965515.05 N 632543.11E 5965501.43 N 632523.33 E 5965487.81N 632504.24 E 5965474.23 N 632485.36 E 5965459.39 N 632465.24 E 5965442.79 N 632443.47 E 5965437.11N 632436.17 E 5965425.62 N 632421.70 E 5965414.09 N 632406.55 E 0.990 0.349 0.027 0.591 0.522 0.266 0.633 0.829 2.089 0.108 0.172 0.301 0.468 0.091 0.605 1.553 0.835 0.478 0.302 0.510 2.015 1.042 1.332 0.341 2.738 Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) Comment 1810.77 1832.86 1853.38 1874.63 1894.36 1914.08 1933.36 1951.78 1970.59 1990.98 2011.20 2031.39 2051.10 2070.61 2090.12 2111.07 2133.55 2156.12 2178.03 2199.72 2222.92 2248.17 2256.67 2273.56 2291.13 Continued... 22 July, 2000 - 20:43 -3- DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 9190.79 27.670 243.600 8499.87 8572.61 9199.92 29.960 240.210 8507.87 8580.61 9231.91 42.800 243.330 8533.58 8606.32 9262.74 54.530 246,840 8553.91 8626.65 9290.55 64.110 250.350 8568.08 8640.82 9305.74 68.080 250.680 8574.24 8646.98 9321.39 72.890 252.860 8579.46 8652.20 9350.93 78.100 254.360 8586.86 8659.60 9385.25 78.440 257.370 8593.84 8666.58 9415.12 78.130 262.270 8599.91 8672.65 9448.95 79.140 265.400 8606.57 8679.31 9480.14 79.670 269.390 8612.31 8685.05 9512.06 80.140 271.390 8617.91 8690.65 9539.85 80.430 275.430 8622.60 8695.34 9569.92 80.160 278.590 8627.67 8700.41 9596.82 79.610 281.460 8632.39 8705.13 9631.82 79.300 285.530 8638.80 8711.54 9659.74 78.850 288.900 8644.10 8716.84 9691.47 78.040 292.540 8650.45 8723.19 9723.59 79.100 296.240 8656.82 8729.56 9757.34 78.990 296.350 8663.23 8735.97 9786.38 79.230 296.600 8668.72 8741.46 9820.21 79.790 296.280 8674.88 8747.62 9845.64 80.790 296.020 8679.17 8751.91 9878.03 84.140 295.510 8683.42 8756.16 1384.06 S 2034.78W 1386.13 S 2038.66W 1395.02 S 2055.37W 1404.69 S 2076.35W 1413.37 S 2098.60W 1418.00 S 2111.69W 1422.61 S 2125.70W 1430.68 S 2153.12W 1438.88 S 2185.71W 1444.05 S 2214.48W 1447.61S 2247.45W 1449.00 S 2278.07W 1448.79 S 2309.50W 1447.16 S 2336.83W 1443.54 S 2366.25W 1438.93 S 2392.32W 1430.90 S 2425.77W 1422.79 S 2451.96W 1411.80 S 2481.03W 1398.80 S 2509.69W 1384.12 S 2539.40W 1371.41 S 2564.93W 1356.59 S 2594.71W 1345.55 S 2617.21W 1331.59 S 2646.13W Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) 5965408.00 N 632396.39 E 30.409 2302.49 5965405.85 N 632392.55 E 30.803 2306.75 5965396.67 N 632376.00 E 40.541 2325.08 5965386.62 N 632355.20 E 38.985 2347.74 5965377.54 N 632333.10 E 36.110 2371.41 5965372.68 N 632320.10 E 26.211 2385.22 5965367.82 N 632306.18 E 33.420 2399.92 5965359.27 N 632278.90 E 18.309 2428.47 5965350.48 N 632246.47 E 8.644 2462.07 5965344.80 N 632217.79 E 16.096 2491.25 5965340.65 N 632184.89 E 9.549 2524.14 5965338.71 N 632154.30 E 12.689 2554.23 5965338.36 N 632122.88 E 6.342 2584.73 5965339.50 N 632095.51 E 14.367 2610.92 5965342.59 N 632066.04 E 10.397 2638.67 5965346.73 N 632039.89 E 10.700 2662.94 5965354.16 N 632006.30 E 11.466 2693.58 5965361.80 N 631979.97 E 11.960 2717.13 5965372.27 N 631950.71 E 11.525 2742.81 5965384.76 N 631921.82 E 11.763 2767.64 5965398.90 N 631891.85 E 0.457 2793.07 5965411.16 N 631866.10 E 1.182 2814.91 5965425.43 N 631836.06 E 1.899 2840.39 5965436.07 N 631813.36 E 4.059 2859.68 5965449.51 N 631784.20 E 10.460 2884.52 Comment Continued... 22 July, 2000 - 20:43 -4- DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Measured Depth (ft) Incl. 9910.21 9941.38 9973.21 10005.51 10039.24 10068.05 10099.21 10130.45 10161.22 10192.77 10226.60 10255.23 10286.73 10317.74 10347.37 10377.66 10410.00 10441.62 10472.16 10503.11 10534.34 10565.95 10596.99 10629.12 10660.69 85.690 86.060 85.880 86.120 86.310 86.490 85.940 85.760 84.5t0 81.470 80.790 81.040 84.450 87.910 90.610 94.740 96.480 96.850 97.960 98.640 98.900 99.390 97.710 96.840 96.970 Azim. 295.850 295.380 295.240 294.960 294.530 295.050 294.610 294.660 294.570 294.430 293.940 294.250 295.390 296.450 297.890 298.700 299.670 298.780 296.220 295.210 295.550 295.650 296.070 296.320 297.090 Sub-Sea Depth (ft) 8686.27 8688.51 8690.75 8693.00 8695.23 8697.04 8699.09 8701.35 8703.96 8707.81 8713.03 8717.55 8721.53 8723.59 8723.98 8722.56 8719.40 8715.73 8711.79 8707.33 8702.56 8697.54 8692.93 8688.86 8685.06 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (fi) (ft) (ft) (ft) (fi) 8759.01 8761.25 8763.49 8765.74 8767.97 8769.78 8771.83 8774.09 8776.70 8780.55 8785.77 8790.29 8794.27 8796.33 8796.72 8795.30 8792.14 8788.47 8784.53 8780.07 8775.30 8770.28 8765.67 8761.60 8757.80 1317.70 S 2675.01W 1304,26 S 2703.05W 1290.69 S 2731.75W 1277.02 S 2760,93W 1262.93 S 2791.49W 1250.88 S 2817,60W 1237.82 S 2845.81W 1224.83 S 2874.14W 1212.06 S 2902.01W 1199.08 S 2930.50W 1185.38 S 2960.99W 1173.84 S 2986.80W 1160,73 S 3015,16W 1147.20 S 3042.98W 1133.68 S 3069.33W 1119.34 S 3095,97W 1103.64 S 3124.07W 1088.31S 3151.48W 1074.33 S 3178.34W 1061.04 S 3205.93W 1047.81S 3233.82W 1034.32 S 3261.96W 1020.94 S 3289.58W 1006.87 S 3318.18W 992.78 S 3346.18W Dogleg Rate (°/100ft) Alaska State Plane 4 PBU_WOA N Pad 1.360 1.581 5.575 2.816 2.456 - ~ - Vertical Section (ft) 5965462.88 N 631755.07 E 4.930 2909.34 5965475.82 N 631726.80 E 1.916 2933.44 5965488.87 N 631697.86 E 0.716 2958,17 5965502.02 N 631668.44 E 1.140 2983.33 5965515.56 N 631637.63 E 1.391 3009.74 5965527,14 N 631611.31E 1.907 3032.29 5965539.69 N 631582.87 E 2.258 3056.66 5965552.17 N 631554.32 E 0.598 3081.15 5965564.44 N 631526.22 E 4.073 3105.26 5965576.91 N 631497.50 E 9.646 3129.91 5965590.06 N 631466.77 E 2.467 3156.34 5965601.14 N 631440.76 E 1.380 3178.73 5965613.74 N 631412.17 E 11.405 3203.22 5965626.76 N 631384.11 E 11.667 3227.10 5965639.82 N 631357.52 E 10.327 3249.55 5965653.68 N 631330.63 E 13.894 3272.08 5965668.86 N 631302.26 E 6.153 3295.72 5965683.71 N 631274.58 E 3.031 3318.77 5965697.21 N 631247.47 E 9.072 3341.60 5965710.00 N 631219.65 E 3.906 3365.31 5965722.73 N 631191.53 E 3389.32 5965735.70 N 631163.15 E 3413.52 5965748.60 N 631135.29 E 3437.24 5965762.15 N 631106.45 E 3461.74 5965775.73 N 631078.20 E 3485.66 Comment Continued,.. 22 July, 2000-20:43 -5- DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 10693.54 96.720 298.450 8681.15 8753.89 977.59 S 3375.03W 10721.92 93.880 298.860 8678.53 8751.27 964.04 S 3399.83W 10755.64 93.380 298.580 8676.39 8749.13 947.87 S 3429.34W 10786.35 93.450 298.980 8674.56 8747.30 933.11S 3456.21W 10814.91 93.020 299.090 8672.95 8745.69 919.27 S 3481.14W 10860.05 92.460 298.980 8670.79 8743.53 897.38 S 3520.56W 10930.00 92.460 298.980 8667.79 8740.53 863.52 S 3581.70W 5965790.41 N 631049.07 E 5965803.51 N 631024.04 E 5965819.15 N 630994.24 E 5965833.43 N 630967.11 E 5965846.82 N 630941.94 E 5965867.99 N 630902.13 E 5965900.75 N 630840.40 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.933° (22-Jul-00) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 256.445° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10930.00ft., The Bottom Hole Displacement is 3684.32ft., in the Direction of 256.445° (True). Dogleg Rate (°/100ft) 4.180 10.110 1.699 1.320 1.554 1.264 0.000 Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) Comment 3510.15 3531.08 3555.98 3578.64 3599.63 3632.83 3684.32 Projected Survey Continued... 22 July, 2000 - 20:43 - 6 - DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for N-IOA Your Ref: API-500292050701 Surveyed: 20 June, 2000 North Slope Alaska Alaska State Plane 4 PBU_WOA N Pad Comments Measured Depth (ft) 5894.44 5913.00 10930.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 5425.34 855.10 S 1275.33 W 5440.16 860.95 S 1284.85 W 8740.53 863.52 S 3581.70 W Comment Tie-on Survey Window Point Projected Survey Survey tool program From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 5925.14 5449.82 To Measured Vertical Depth Depth (ft) (ft) 5925.14 5449.82 10930.00 8740.53 Survey Tool Description AK-1 BP_HG - BP High Accuracy Gyro MWD Magnetic 22 July, 2000 - 20:43 - 7- DrillQuest 1.05.04e MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM: Dan Seamount Commissioner. ~ Blair Wondzell P.I. Supervisor Jeff B. Jone~~)--- Petroleum I ns~ecto'~ NON- CONFIDENTIAL DATE: June 17, 2000 SUBJECT: Blowout Preventer Test Nabors 9-ES Phillips Petroleum N-Pad N-10A 200-086 Prudhoe Bay Unit Operator Rep.: Steve Lewis Contractor Rep.: Chris Clemens Op. phone: 659-4831 Rig phone: 659-4806 Op. E-Mail: Rig E-Mail: Test Pressures Rams: 3500 psi MISC. INSPECTIONS: P/F Location Gen.: P Sign: Housekeeping: P Rig cond: PTD On Location P Hazard: Standing Order: P BOP STACK: Annular: 3500 psi Choke: 3500 psi TEST DATA FLOOR VALVES: MUD SYSTEM: Visual Alarm P/F Quantity P/F Trip Tank P P P Upper Kelly P Pit Level Indicators P P P Lower Kelly F Flow Indicator P P P Ball Type P Meth Gas Detector P P Inside BOP P H2S Gas Detector P P Quantity Size P/F ACCUMULATOR SYSTEM: Annular Preventer 1 13 5/8 P CHOKE MANIFOLD: Time/Psi P/F Pipe Rams 1 2 7/8 X 5 P Quantity P/F System Pressure 3050 P Lower Pipe Rams 1 2 7/8 X 5 P No. Valves 14 P After Closure 1750 P Blind Rams I shear P Man. Chokes 1 P 200 psi Attained 31 sec. P Choke Ln. Valves 1 3' P Hyd. Chokes I P Full Pressure 2.2 min. P HCR Valves 2 3' P Blind Covers (All Stations): P Kill Line Valves 2 3' P N2 Bottles (avg): 6 @ 1800 P Check Valve 0 N/A Test's Details On June 17, 2000 I traveled to Phillips Petroleum's PBU N-Pad well #10A where personnel on Nabors rig 9-ES were rigging up to test BOPE. The testing proceeded as scheduled and was performed in a safe and proficient manner by Nabors Drilling personnel with one failure. The lower kelly valve failed to hold pressure initially and was replaced while 1 was on location and passed the re-test. I witnessed a random inspection of the gas detection alarms on the rig floor and in the mud pits with no failures. Records kept on the rig indicated that all the gas detectors had been tested and calibrated earlier that day. The rig appeared clean and in good condition and the location was well organized. Summary: I witnessed an initial BOPE test and a random gas detector system test on Nabors rig 9-ES performing a re- drill operation on Phillips Petroleum's N-Pad well# l 0A. Total Test Time: 4 hrs. Number of failures: cc: blair wondzell~admin.state.ak, us bob fleckenstein~,admin.state.a k.us 1 Attatchments: None BOP Nabors 9ES 6-17-00 JJ 6/21/00 ALASKA OIL AND GAS CONSERVATION CO~I~IISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dan Stone Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit N-10A BP Exploration (Alaska) Inc. Permit No: 200-086 Sur Loc: 4356'SNL, 4742'WEL, Sec. 08, T1 IN, R13E, UM Btmhole Loc. 5258'SNL, 2991'WEL, Sec. 07, T11N, R13E, UM Dear Mr. Stone: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~'~"~ day of June, 2000 dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ---. STATE OF ALASKA ALASKA _AND GAS CONSERVATION COMIV, .;ION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 73.5' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation ,~.~,-J Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028282 oz.~ 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4356' SNL, 4742' WEL, SEC. 08, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 468' SNL, 1501' WEL, SEC. 18, T11N, R13E, UM N-10A Number 2S100302630-277 At total depth 9. Approximate spud date 5258' SNL, 2991' WEL, SEC. 07, T11N, R13E, UM 06/10/00 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well !14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028283, 20' MDI No Close Approach 2560 10870' MD / 8730' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 5200' MD Maximum Hole Angle 97.9 o Maximum surface 2448 psig, At total depth (TVD) 8571' / 3305 psig 18. Casing Program Specifications Setting Depth Size Top Bottom quantity of Cement Hole Casinq Weiqht Grade Couplinq Lenqth MD TVD MD TVD (include stare data) 8-1/2" 7" 26# L-80 BTC-M 4056' 5050' 4756' 9106' 8533' 189 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 1920' 8950' 8385' 10870' 8730' 255 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 11124 feet Plugs (measured) Cement Cap at 10135'; Bridge Plugs at 10182', 10475', true vertical 9462 feet and 10440' Effective depth: measured 10135 feet Junk (measured) Multiple junk, fish, sand, cement plugs and IBP's below true vertical 8741 feet 10135' Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 11 cu yds Concrete 110' 110' Surface 2630' 13-3/8" 4000 sx Arcticset II, 140 sx Top Job 2666' 2666' Intermediate 10000' 9-5/8" 1255 sx Class 'G', 130 sx AS I 10033' 8661' Production 1603' 7" 375 sx Class 'G' 9521' - 11124' 8260' - 9462' ..... ORIGI"'LiV4 Perforation depth: measured 10082' - 10110' , Below Bridge Plug: 10232' - lO~a Od ~:~ Gas ~' """?~ ...... ~""* true vertical 8700' - 8722' Below Bridge Plug: 8816'- 8990' 20.' Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is~ect to the best of my knowledge 5/ / Signed Dan Stone ~,.- '~0, . Title Senior Drilling Engineer Date - Permit Number JAP, Number J _Apprgva, Qate j See cover letter ,2-.-~--~--~)~(0 50-029-20507-01 ~¢-" ~-, i~)(---) for other requirements Conditions of Approval: Samples Required ~,,~/Yes ~ No Mud Log Required [] Yes J~[ No Hydrogen Sulfide Measures ,]J~J, Yes E]I~> Directional Survey Required /~J'Yes [] No Required Working Pressure for BOPE r-I2K; I-I 3K; I-1 4K; r'l 5K; I-1 10K; r-115K Other: ~,,'~0~ ~,~, ~'~ by order of ! Approved By .... ,,-,,~,,&i ~t(-~E[) 8¥' Commissioner the commission Date~¢' '- Form 10-401 Rev. 12-01-85 D Taylor Seamount Submit In Triplicate N-10A Permit to Drill IWell Name: I N-10A Sidetrack Plan Summary I Type of Redrill (producer or injector): I Producer Surface Location: Target Location: X = 634,409 / Y = 5,966,827 922' FSL 537' FWL S08T11N R13E X = 632,400 / Y = 5,965,400 468'FNL 1501'FEL S18T11NR13E Umiat Umiat Bottom Hole Location: x = 630,899 / Y = 5,965,863 20' FSL 1935' FWL S07T11N R13E Umiat AFE Number: 14P1382 I I Estimated Start Date: 16/10/00 I MD: 110,870'I I TVD: 18730' I IBF/MsL: 144.68' I I Well Design (conventional, slimhole, etc,): I Horizontal Sidetrack Objective: I Development producer targeting Zone 4 sands. I Ri9: I Nabors9ES I Operating days to complete: 124 IRKB: 173.5' Mud Program: IMilling/Cutting (:asing Mud Priperties: LSND Density (ppg) Funnel Vis Yield Point 9.6 45 - 55 25 - 35 Whipstock Window in 9-5/8" I pHI HTHP FL 9 - 9.5 <10 Intermediate Mud Properties: LSND 18-1/2" hole section From sidetrack depth to 6750' MD (6311' TVD). -150' MD above CM-1 shales. Density (ppg)I Funnel Visj Yield PointI PV I tau0 9.6 to 10.0 45 - 55 23 - 28 10 - 17 3 - 7 From 6750' MD (6311' TVD) to interval TD. Density(ppg) IFunnelVis I YieldPointI 10.0 tO 10.1 45 - 55 23 - 28 PV I tauO I 13-19 3-7 pH 9 - 9.5 APl FL <10 to 6 pH 9- 9.5 HTHP FL <10 Production Mud Properties: Low Density QUICKDRILn Density (PPg) I Funnel vis I LSRV PV 8.3 - 8.5 40 - 50 < 12,000 cP 5 - 8 6 1/8" hole section YP Ca++ APl FI pH 17 - 22 <100 <10 9.0-9.5 N-10A Permit to Drill Directional: KOP: I 5200' MD Maximum Hole Angle: Close Approach Well: Intermediate - 40.0° @ 5240' (4904' TVD) Production- 97.9° @ 10,402' (8794' TVD) None Logging Program: Intermediate Section Production Hole Drilling' MWD / GR Open Hole: None Cased Hole: None Drilling: MWD / GR / Resistivity Open Hole: None Cased Hole: None Formation Markers: Formation Tops MD TVDss Comments Base Permafrost Not Penetrated SV3 / T5 Not Penetrated SV1 / T3 Not Penetrated UG4 / K15-C1 Not Penetrated UG1 / UgS 4487' Kick-off with-in UG1 Kick-Off Point 5200' 4800' Est. pore pressure 2300 psi (9.2 ppg EMW) WS2 5508' 5067' Est. pore pressure 2425 psi (9.2 ppg EMW) WS1 / West Sak 5730' 5276' Est. pore pressure 2525 psi (9.2 ppg EMW) CM3 / K-12 5957' 5490' CM2 / K-10 CM-1 / K5 6900' 6380' K2/Top HRZ 7277' 6735' LCU 7548' 6990' Miluveach 7548' 6990' Top Kingak (JG) 7855' 7280' Sag River 9106' 8459' Est. pore pressure 3225 psi (7.3 ppg EMW) Shublik 9151' 8498' Top Sadlerochit / Z4B 9254' 8571' Est. pore pressure 3305 psi (7.4 ppg EMW) Top Z4A 10,065' 8680' Maximum TVDss 10,300' 8724' T41N 8734' Not Penetrated HOT Not Penetrated OOWC Not Penetrated Casincl/Tubing Proqram: Hole Size Csg! Wt/Ft Grade Conn Length Top Btm Tb~l O.D. MD/TVD MD/TVD 8-1/2" 7" 26# L-80 BTC-M 4056' 5050'/4756' 9106'/8533' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 1920' 8950'/8385' 10,870'/8730' Tubing 4-1/2" 12.6# 13Cr-80 New Vam 12,737' -33'/33' 8950'/8385' N-10A Permit to Drill Cement Calculations: Liner Size 1 7" Intermediate I Basis: Lead: None Lead TOC: N/A Tail: Based on 82' shoe track volume and 1200' of open hole with 30% excess. Tail TOC: At-7900' MD (7395' TVD). I Total Cement Volume: I Lead I None ITail 1 39 bbl/219 ft~ / 189 sks of Dowell Premium 'G' at 15.8 ppg and 1 1.16 cf/sk. Liner Size I 4 Y2" Production I Basis: Tail: Based on 1764' of open hole with 50% excess, 150' of 7"x 4.5" liner lap, 200' of 7"x 4" drill pipe annulus volume, and 82' of 4-1/2" shoe joint. Tail TOC: At top of liner -8950' MD (8385' TVD). Total Cement Volume: Tail I 53 bbl / 298 ft~ / 255 sks of Dowell Premium 'G' at 15.8 ppg and 1 1.17 cf/sk. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 3500 psi. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Section- . Maximum anticipated BHP: 2525 psi @ 5276' TVDss - West Sak · Maximum surface pressure: 1998 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/E) Production Interval- . Maximum anticipated BHP: 3305 psi @ 8571'TVDss - Zone 4 · Maximum surface pressure: 2448 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 3500 psi 8.5 ppg Seawater/6.8 ppg Diesel N-10A Permit to Drill Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S · N Pad is designated as an H2S drill site and Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S ever measured on N Pad has been 277 ppm from N-23. The latest H2S information on N-10, shows levels as high as 68 ppm. DRILLING CLOSE APPROACH' · All wells pass close approach guidelines. INTERMEDIATE SECTION: · Gas cut mud has been observed in the Ugnu (KOP @ 4800' TVDss) and West Sak (5067' TVDss) sands. This will be controlled with appropriate mud weights. A minimum of 9.4 ppg is recommended. · The N-10A well path will drill full sections of both the HRZ and Kingak shale. · Tight hole conditions and stuck pipe have been encountered in the Kingak shale interval. Increased mud weights and the addition of shale stabilizers may be required. · Lost circulation in the intermediate section has not been a problem at N Pad. · The kick tolerance for the 8-1/2" open hole section would be 157 bbls assuming an influx from the Sag River interval at -9106' MD. This is a worst case scenario based on a 7.8 ppg pore pressure gradient, a fracture gradient of 12.0 ppg at the 9-5/8" window, and 10.1 ppg mud in the hole. PRODUCTION SECTION: · The N Pad area is highly faulted and these faults have a history of being conductive, resulting in numerous lost circulation incidents. As planned, five faults will be crossed while drilling the reservoir section of N-10A. Of the five faults, fault 3 is the highest risk due to the anticipated stress orientation. The well plan has been optimized to cross this fault at a point of clean offset, but due to the structure, fault 3 is planned to be crossed Iow in the reservoir section at a point of sand-on-sand (poor seal) juxtaposition. The fourth and fifth faults crossed within the reservoir have less risk than fault 3, however still represent a 'moderate to high' risk of losses because they cross close to fault tip-out zones. To be prepared for any potential lost circulation, a copy of the 'Recommended Lost Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent to the rig prior to drilling out in the 6-1/8" production interval. · Differential sticking will be a problem if lost circulation is occurring or if the drill string is left stationary for an extended period or time. · The kick tolerance for the 7" shoe would be an infinite influx (annular volume) assuming an influx at section TD of 10,870'. This is a worst case scenario based on a 7.8 ppg pore pressure, a minimum fracture gradient of 9.5 ppg at the 7" casing shoe, and 8.3 ppg mud in the hole. Disposal: · No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. N-10A Permit to Drill SUMMARY SIDETRACK PROCEDURES Pre-Riq Work: * Notify the field AOGCC representative with intent to plug and abandon * 1. RIH with CTU and perform a cement P&A using 15.8 ppg class 'G' cement with adequate cement volume to fill the 7" liner from PBTD at 10,135' MD and extend up into the tubing tail N100', plus squeeze 5 bbls to the perforations. Estimated minimum cement volume needed is 28.6 barrels. Use aggregate as required to aid in plugging the perfs. NOTE: The AOGCC has requested on prior sidetracks exiting above the reservoir, that the top of cement be brought up into the tubing tail ~100', therefore the minimum top of cement should be 9,422'. Top of cement may extend further up into the tubing as long as it does not interfere with the upcoming tubing cutting operations. 2. Rig up slickline, tag and document top of cement and drift tubing for upcoming tubing cut. 3. Liquid pack the 9-5/8" x 4-1/2" annulus to surface. Test the integrity of the cement plug and 9-5/8" casing by simultaneously pressure testing both the tubing and 9-5/8" annulus to 3000 psi for 30 minutes. Increase tubing pressure prior to the 9-5/8" annulus to avoid possibility of tubing collapse. 4. RU E-line. Cut the 4 ~" 13Cr-80 tubing at approximately 8940' MD using a chemical cutter. This cut will not be fished, however avoid cutting a tubing collar. Displace the well to clean seawater by circulating down tubing through the tubing cut. Continue to circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel. 5. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ri.q Operations: 1. MIRU Nabors 9ES. 2. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull and lay down 4-1/2" tubing from E-line cut and above. 5. RU E-line and make GR/JB run to top of tubing cut. Set BP on E-line at -5223' MD (set as needed to avoid cutting casing collar). 6. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock as desired and set on BP. Mill window in 9-5/8" casing at -5200' MD. POOH. 7. Kick-off and drill the 8-1/2" intermediate section to Top Sag @ _+9106' MD (8533' TVD). 8. Run and cement a 7", 26# intermediate drilling liner, cemented -1000' above the 7" casing shoe. 9. Make up and RIH with 6-1/8" directional assembly to the landing collar. 10. Test the 9-5/8" casing and 7" liner from the landing collar to surface to 3000 psi for 30 minutes. 11. Drill the 6-1/8" production section as per directional plan to an estimated TD of 10,870' MD (8730' TVD). 12. Run and cement a 4 Y2", 12.6# solid production liner throughout the 6-1/8" wellbore. Displace well to clean seawater above liner top. POOH. N-10A Permit to Drill 13. Test the 4-1/2", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 3000 psi for 30 minutes. 14. Pick up perf guns on 2-3/8" x 4-1/2" DP and RIH to perforate -400' of selective intervals. Perforate well with -200 psi underbalance to the reservoir. POOH LD DP. 15. Run 4-1/2", 12.6# 13Cr-80 New Vam completion tying into the 4-1/2" liner top. 16. Set packer and test the tubing to 3500 psi and annulus to 3000 psi for 30 minutes. 17. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 18. Freeze protect the well to -2200' and secure the well. 19. Rig down and move off. Post-Riq Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the new production packer. Install gas lift valves. Estimated Pre-rig Start Date: Estimated Spud Date: 06/03/00 06/10/00 William Isaacson Operations Drilling Engineer 564-5521 N-10 Proposed P Rig ~.~v=~.~o, T~: ~"o,w WELLHEAD: FMC BF. ELEV = 44.68' ACTUATOR: OTIS 9-5/8" DV Packer I 2'5881 ~ ~~ --. 4-1/2 SSSV LANDING NIPPLE. . I I ~ (CAMCO)(~..~",~)I 2'°°61 ~.-~o~"~s~" I I I I GAS LIFT MANDRELS 13 CHROME TUBING ~ ~ ~ (o~s W/~A ~CH) ~1 I ~ N° I MD(BKB) ~Dss Dev 41/2", 12.6~/ff,NT 13 CR 80 TDS ~ ~* ~- 2,9762,896 6~o lop o~ ~re-r,~ ~&A Coment at-~422' l~~1' (~"~ ~.~"'~' ' ' I~~ ~ 41/~"T~ ~A,. I ',~ I ~ (ELMD) 1 9'522 I ~ ~ Packer Squeezed. bottom I ~ ~n I 9-5/8", 47¢/E, L-80, 9TRS 11o,o33 1 ~ a ~ of cement ( 3.65" ID) I -'-~- I SAG RIVER ~~ Inflatable Bridge Plug (1~2~94)Ilo,1~ I ~1 _ ~.....~- ~ost ~ ,e~,s on ~ui~ PERFORATION SUMMARY I~~ ~ UR arms on 10-31-91. ,e o New Tie-In Log:SWS-G~CCUJeweI~ 10-16-91 ~uEer head on 9-7-91 (pre RWO). Size SPF Interval O~Sqzed 3-3/8" 6 10,080-10,110' Open 11-15-91 I ~~sand w/cemnt cap 5/16/91 110'304 I 3-~/8 .... 10,328 - 10,3~4' 8qzd 10-27-01 I ~ [ FISH $4 - IB~ Silt 5-~4-~1 AT 10,475'. a-3/8 .... lO,a~O- 10.442' SqzO 10-27-01 I [~ Co. a 2.5' ~ull Disconnoct with 1.38" 3 1/8" 4 10,452 - 10,4~4' SqzO 7-25-87 ~ i~ fi~in~ hock Bosido the IB~ fishin~ hOCk. ~ ~ SCALE & SD CAP. PUSHED DOWN I~~_ 10,~,, CTM. ~.AC S~ ON TO.. I ~~~ ~,S...-.OST ON ,0-,-~-1" O~ X ~' I~ ~' PRONG FROM IBP. TOPAT 10798' ~~ ,.s.,, -,OST ON ~-.~-~ ~ ,~;" x ~.~" PBTD~ RF GUN(PROBABLY UNFIRED) TOP ,",~,-~O~T.S~ .0~,~"M..~. DATE REV. BY COMMENTS PRUDHOE BAY UNIT 12-21-8o Initial Ri~ Completion WELL: N-10 (21-18-11-13} 09-21-91 SJA Post 1991 RWO COMPLETION 11-15-91 A. TEEL PRE FRAC/SAG R~VER PERFS APl NO: 50-029-20507 6/14/96 PPA Cement CapAdded SEC 8; TN 11N; RGE 13E ~/~/~. ~T. ~acker Sq.~ez~ BP Exploration (Alaska) 2/20/99 Nords Update to PC GAS LIFT MANDRELS ( OTIS W/RA LATCH) N-° MD(BKB) TVDss Dev 5 2,976 2,896 6° 4 5,586 5,101 37° 3 7,374 6,543 36° 2 8,899 7,715 43° I 9,400 8,089 41 o TREE: 4-1/16 "- 5M CIW L-80 WELLHEAD: 13 5/8" - 5M FMC 13-3/8", 72 #/ft, L80, BTC I 2666' N-10A Proposed Completion 4-1/2" 'X' Landing Nipple with 3.813" seal bore. Cellar Elevation = 43.50' Base Flange = 44.68' Nabors 9ES RKB = 73.5' Window Milled from Whipstock Top of Window at +/-5200' MD Bridge Plug set at +/-5223' MD +~-5050' BAKER 7" x 9-5/8" Tie Back Sleeve ZXP Liner Top Packer 'Flex Lock' Hydraulic Liner Hanger 4-1/2" 12.6# 13Cr-80, TDS or NewVam Tubing with GLM's GAS LIFT MANDREL,~ .......... rvD . Size Valve.Type 1 TBD 1-1/2" RP Shear 2 " 1-1/2" DV 4 " 1" DV 1" DV 7", 26 #Iff, L-80, BTC-Mod 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 7" x 4-1/2" Baker 'S-3' Production Packer 4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID. 4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. I BAKER 5" x 7" Tie Back Sleeve +/-8,950' ZXP Liner Top Packer 'HMC' Hydraulic Liner Hanger 4-1/2" 12,6 #/ft, L-80, BTC-Mod I +/-10,870' I Plug Back Depth I +/-10,785' I Horizontal Sidetrack into Zone 4 Sands Date Rev By Comments PRUDHOE BAY UNIT 05/24/00 WSI Proposed Completion WELL: N'10A APl NO: 50-029-20507-01 Shared Services Drilling 7", 29 #/ft, L-80, BTC ~ ~)RIL, I-I N I~ SERVICES Shared Services Drillinc_ I DrillQuest N-10A Wp05 50OO 55O0 6000 65OO 7000 75OO KOP · Start Dir @ 10.000°/100ft· 5200.00ft MD, 4873.33ft TVD End Dir- 5446.83ft MD, TVD Proposal Data for N-10A Wp05 Vertical Origin: Well Horizontal Origin: Well Measurement Units: ft North Reference: True North Dogleg severity: Degrees per 100ft Vertical Section Azimuth: 255.669° Vertical Section Description:Well Vertical Section Origin: 0.00 N,0.00 E Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 5200,00 37.999 238.112 4873.33 632.90 S 917.06 W 1045.19 5240.00 40.126 232,734 4904.40 647.22 S 937.78 W 1068.81 I0.000 5446.83 19,500 236.026 5082.90 707.52 S 1020.35 W 1163.73 10.(XX) 9112.70 19.500 236,026 8538.50 1391.35 S 2035.14 W 2316.21 ().O{X) 9117.70 19.500 236.026 8543.21 1392.28 S 2036.53 W 2317.78 O.O(X) 9324.47 83.600 236,026 8665.19 1478.13 S 2163.92 W 2462.46 31.0(X) 9433.37 83.602 270.000 8677.69 15{)9,27 S 2265.86 W 2568,94 31.000 9536.57 83,669 282,461 8689.18 1498.16 S 2367,62 W 2664.78 12.0(X) 9838.75 83,669 282.461 8722.50 1433.35 S 2660.89 W 2932.88 O.0(X) 9992.50 83.000 301.026 8740.50 1377.05 S 2802.10 W 3055.76 12.000 10032.35 78.305 301.942 8746.97 1356.53 S 2835.62 W 3083.15 12.0(X) 10237.23 78.305 301.942 8788.50 125(}.38 S 3(X)5.87 W 3221.83 O.(XX) 10401.59 97,907 304.139 8793.91 1161.24 S 3142.89 W 3332.53 12.(XX) 10869.76 97.907 304,139 8729.50 901.(X) S 3526.70 W 3639.97 O.(XX) 8000 O ~o 85oo II ._ ..,- -- 7 Lineroo Start Dir @ 31.000°/100ft: % 57~¢0' t5c°'/7'69~JO -pJO 9112 7o MD \ 9117.70ft MD, 8543.21ft TVD ~.. g~,3.'3..~ _9,2. 50~t 85~8:5o ~% ~\ -~ ooo°L?~'~~'~'~ _ ..,~,¢,ua, ~',~' _. ~o~,~° ............................................. ~ ................... e ~_2~'~O t,~o~,' ... 9t,3~.'~.. q7'¢, ~ ".."LAn 1~,~6, /,~-~;~;. ,~.~-::.-.~ .~,:/-v?~ - \ __ r~ecre_¢g'~o 57~' .... ~'"0'F~OOr' '.~n ~,7~"~'~,,,~'7 t3~'~{~~ .............. ;.:. :-..; .x.~: .... ~~E~u x,,dOXr ~.~...~0u°¢'.~ 0~°~J, ~9~~' 7';:5;.~ · x':'.'L:'..:;::)7 t'? ~ '"' '~ 10869.76 MD I I I 1000 1500 2000 2500 ScaPe: linch--50Oft Vertical Section t~"~ 0/~. ~lp05 8729.50 TVD ', 3000 3500 Section Azimuth: 255.669° (True North) Prepared: ~-[~h-e~ ........... I/(pproved,' North Slope Alaska Alaska State Plane 4 PBU_WOA N Pad N-IOA WPS Shared Services Drilling , N-IOA Wp05 I DrillQuest'" -400 - -800 - Z - 1200 - II E- -~oo ',r-' Scale: linch = 400ft -4O0O -3600 I 4 1/2" Liner 10869.76 MD 8729.50 TVD Stad Dir (--¢ 12.000"/100ft ' Dir Rate -3200 -2800 '~~~ - 1600 - 1200 _P' Start Dir @ 10.000°/100ft' 5200.00ft MD, 4873.33ft TVD End Dir' 5446.83ft MD, 5082.90ft I Eastings -2400 I End Dir: 10401.;~93.9 @ 12.000°/100ft' 10237.23ft MD, 8788.50ft TVD Dir- 10032.35ft MD, 8746.97ft TVD ....- · tTVD ~- Dir' 9536.57ft MD, 8689.18ft TVD . · . . 12.000°/100ft' 9433.37ft MD, 8677.69ft TVD 7" Liner 9112.70 MD 8538.50 TVD Start Dir @ 31.000°/100ft · 9117.70ft MD, 8543.21ft TVD I I I I I I I 1 -4000 -3600 -3200 -2800 -2400 -2000 -1600 -1200 -400 -800 -1200 Scale: linch = 400ft Eastings Reference is True North Prepared: Checked: ~Approved: North Slope Alaska Alaska state Plane 4 PBU_ WOA N Pad, Slot N- N-IOA WPS- N-IOA Revised: 9 March, RT 2000 Surface Coordinates: K~~ing: 73.50ft above Mean Sea Level 148° 54' 37.6942" W) DRILLING SERVICES Proposal Reft pro9667 ~ II~,l I IIlI'RII}X ('()%11'.~?~'~ Sperry-Sun Drilling Services Proposal Report for N-IOA WPS - N-IOA Wp05 Revised: 9 March, 2000 North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 5200.00 37.999 238.112 4799.83 4873.33 5240.00 40.126 232.734 4830.90 4904,40 5300.00 34.136 233.313 4878.71 4952.21 5400.00 24.162 234.828 4965.94 5039,44 5446.83 19,500 236.026 5009.40 5082,90 5500.00 19.500 236.026 5059.52 5600.00 19,500 236,026 5153.78 5700.00 19,500 236,026 5248.05 5800.00 19.500 236.026 5342.31 5900.00 19,500 236,026 5436.58 6000.00 19.500 236.026 5530.84 6100.00 19.500 236.026 5625.10 6200.00 19.500 236.026 5719.37 6300.00 19.500 236.026 5813.63 6400.00 19.500 236.026 5907.90 6500.00 19.500 236.026 6002.16 6600.00 19.500 236.026 6096.42 6700.00 19.500 236.026 6190.69 6800.00 19.500 236.026 6284.95 6900.00 19.500 236.026 6379.22 7000.00 19.500 236.026 6473.48 7100.00 19.500 236.026 6567,75 7200.00 19.500 236.026 6662.01 7277.43 19.500 236.026 6735.00 7300.00 19.500 236.026 6756.27 5133.02 5227.28 5321.55 5415.81 5510.08 Local Coordinates Global ~o~[~'l~tes Northings Eastings Northings'~l~,.'~ings (ft) (ft) (ft)~~l~ ~[l~t) 632.90 S 917.06 W ~111~31~ TM 633503.42 E 647.22 S 937,78 W ~0 N 633482.95 E 669.00 S 966.70 W & 59~.80 N 633454.44 E 697.63 S 1006.03 ~,~1~ 5966111.47 N 633415.63 E 707.52 S 1020~11kW~11~966101.32 N 633401.48 E 717.44 S ~1~ 5966091.14 N 633386.94 E 736.09 S 1~1~t7~1~ 5966072.00 N 633359.60 E 754.75~1~i~ ~1~3 V~ 5966052.85 N 633332.26 E 773.46~ ~1T18.11 W 5966033.70 N 633304.91 E 792.06~11111~1145.80 W 5966014.56 N 633277.57 E 5604.34 i~2~- 5698.60 5887.13 ~ 5981.40& 5;33 S 903.98 S 922.63 S 6 941.29 S 959.94 S 6452.72 978.59 S 1173.48W 5965995,41 N 1201.16W 5965976.26 N 1228.84W 5965957.12 N 1256.53W 5965937.97 N 1284.21W 5965918.82 N 1311.89W 5965899.68 N 1339.57W 5965880.53 N 1367.25W 5965861,38 N 1394.94W 5965842.24 N 1422.62W 5965823.09 N 633250.22 E 633222.88 E 633195.54 E 633168.19 E 63314O.85 E 633113.51E 633086.16 E 633058.82 E 633031.47 E 633004.13 E 632976.79 E 632949.44E 632922.10 E 632900.93 E 632894.76 E 6546.98 997.25 S 1450.30W 5965803.95 N 6641.25 1015.90 S 1477.98W 5965784.80 N 6735.51 1034,56 S 1505.66W 5965765.65 N 6808.50 1049.00 S 1527.10W 5965750.83 N 6829.77 1053.21S 1533.35W 5965746.51N Dogleg Rate (°/100ft) 10.000 10.000 10.000 10,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) 1045.18 1068.80 1102.21 1147.40 1163.73 1180.44 1211,88 1243.32 1274.76 1306.19 1337.63 1369.07 1400.51 1431.95 1463.38 1494.82 1526.26 1557.70 1589.14 1620.57 1652.01 1683.45 1714.89 1739.23 1746.33 Comment KOP: Start Dir @ 10.000°/100ft: 5200.00ft MD, 4873.33ft TVD End Dir: 5446.83ft MD, 5082.90ft TVD THRZ Continued... 30 May, 2000 - 11:51 - 2 - DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for N-IOA WPS - N-IOA Wp05 Revised: 9 March, 2000 North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 7400.00 19.500 236.026 6850.54 7500.00 19.500 236.026 6944.80 7600.00 19.500 236.026 7039.07 7700.00 19.500 236.026 7133.33 7800.00 19.500 236.026 7227.59 7855.59 19.500 236.026 7280,00 7900.00 19.500 236.026 7321.86 8000.00 19.500 236.026 7416.12 8100.00 19.500 236.026 7510.39 8200.00 19.500 236.026 7604.65 8300.00 19.500 236.026 7698.92 8400.00 19.500 236.026 7793.18 8500.00 19.500 236.026 7887.44 8600.00 19.500 236.026 7981.71 8700.00 19.500 236.026 8075.97 8800.00 19.500 236.026 8170.24 8900.00 19.500 236.026 8264.50 9000.00 19.500 236.026 8358.76 9100.00 19.500 236.026 8453.03 9106.33 19.500 236.026 8459.00 9112.70 19.500 236.026 8465.00 9117.70 19.500 236.026 8469.71 9200.00 45.013 236.026 8538.74 9254.35 61.863 236.026 8571.00 9300.00 76.013 236.026 8587.36 Vedical Depth (fi) 6924.04 7018.30 7112.57 7206.83 7301.09 7353.50 7395.36 7489.62 7583.89 7678.15 7772.42 7866.68 7960.94 8055.21 8149.47 8243.74 8 8538.50 8543.21 8612.24 8644.50 8660.86 Local Coordinates Nodhings Eastings (ft) (~) 1071,86S 1561,03W 1090.52 S 1588.71W 1109,17 S 1616,39W 1127.83 S 1644.08W 1146.48 S 1671.76W 1156.85 S 1687. 1165.13 S 16~ 1183.79 S 1202.44 S 1221.10 Global ~~[tes No~hings~l~,tings (ft)~~l~ ~rt) ~'~1~' 632867.41E ~657~1~ 632840,07E 5965650.77 N 632758,04 E ~965640.13 N ~965631.63 N 5965612.48 N 5965593.33 N 5965574.19 N 11810.17W 5965555.04 N L40 1837.85W 5965535.89 N S 1865.53W 5965516.75 N 1893.22W 5965497.60 N .36 S 1920.90W 5965478.45 N S 1948.58W 5965459.31N 351.67 S 1976.26W 5965440,16 N 1370.33 S 2003.94W 5965421.01N 1388.98 S 2031.63W 5965401.87 N 1390.16 S 2033,38W 5965400.66 N 1391.35 S 2035.14W 5965399.44 N 1392.28 S 2036.53W 5965398.48 N 1416.63 S 2072.65W 5965373.49 N 1440.93 S 2108.73W 5965348.54 N 1464.68 S 2143.96W 5965324.17 N 632742.84 E 632730.69 E 6327O3.35 E 632676.01E 632648.66 E 632621.32 E 632593.97 E 632566.63 E 632539,29 E 632511,94 E 632484.60 E 632457.26 E 632429.91E 632402.57 E 632400.84 E 632399.10 E 632397.73 E 632362,04 E 632326.41E 632291.61E Dogleg Rate (°/100ft) 0.000 0.000 0.000 0.000 0.000 0.0o0 o.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 31.000 31.000 31.000 Alaska State Plane 4 PBU_WOA N Pad Ve~ical Section (fi) 1777.76 1809.20 1840.64 1872.08 1903.52 1920.99 1934.95 1966.39 1997.83 2029.27 2060.71 2092.14 2123.58 2155.02 2186.46 2217.90 2249.33 2280.77 2312.21 2314.20 2316.20 2317.78 2358.80 2399.77 2439.79 Comment TKING TSGR 7" Liner Start Dir @ 31.000°/10Oft: 9117.70ft MD, 8543.21ft TVD TSAD Continued... 30 May, 2000 - 11:51 - 3 - DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for N-IOA WPS - N-IOA Wp05 Revised: 9 March, 2000 North Slope Alaska Measured Depth (ft) 9324.47 9400.00 9433.37 Incl. 83.600 83.356 83.602 Azim. 236.026 259.592 270.000 Sub-Sea Depth (ft) 8591.69 8600.39 8604.19 9500.00 83.611 278.046 8611.62 9536.57 83.669 282.461 8615.68 9600.00 83.669 282.461 8622.67 9700.00 83.669 282.461 8633.70 9800.00 83.669 282.461 8644.72 9838.75 83.669 282.461 8649.00 9900.00 83.319 289.850 8655.95 9992.50 83.000 301.026 8667.00 10000.00 82.116 301.197 8667.97 10032.35 78.305 301.942 8673.47 10100.00 78.305 301.942 8687.18 10200.00 78.305 301.942 8707.45 10237.23 78.305 301.942 8715.00 10300.00 85.791 302.789 8723.68 10400,00 97.717 304.117 8720.62 10401.59 97.907 304.139 8720.41 10500.00 97.907 304.139 8706.87 Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 8665.19 1478.13 S 2163.92 W 8673.89 1506.27 S 2232.90 W 8677.69 1509.27 S 2265.86 W 8685.12 1504.63 S 2331.87 8689.18 1498.16 S 2367.6 8696.17 1484.56 S 8707.20 1463.11S 8718.22 1441.66 8722.50 1433.3~ ~9W 8729.45 1, 1.43 W 8740.50 2802.10W 8741.47 21 S 2808.46W 8746.97 $ 2835.62W 321.48 S 2891.84W 1269.67 S 2974.93W 8 1250.38 S 3005.87W 8797.18 1217.12 S 3058.34W 8794.12 1162.13 S 3141.58W 8793.91 1161.24 S 3142.89W 8780.37 1106.54 S 3223.56W Global~o~l~ Nodhings"~TM {55709'" 632271.89 632203.43 N 632170.52 Alaska State Plane 4 PBU_WOA N Pad s Dogleg Vertical ings Rate Section t) (°/lOOft) (ft) E 31.000 2462.46 E 31.000 2536.25 E 31.000 2568.94 5965280.86 N 632104.45 E 12.000 2631.73 N 632068.58 E 12.000 2664.78 5965299.19 N 632006.79 E 0.000 2721.05 5965318.89 N 631909.37 E 0.000 2809.77 5965338.60 N 631811.96 E 0.000 2898.49 5965346.24 N 631774.20 E 0.000 2932.87 5965362.11 N 631715.50 E 12.000 2985.27 5965400.00 N 631632.00 E 12.000 3055.76 5965403.73 N 631625.57 E 12.000 3060.97 5965419.92 N 631598.12 E 12.000 3083.15 5965453.96 N 631541.29 E 0.000 3128.94 5965504.27 N 631457.28 E 0.000 3196,63 5965523.00N 631426.00 E 0.000 3221.83 5965555.32 N 631372.94 E 12.000 5965608.81 N 631288.73 E 12.000 5965609.68 N 631287.41 E 12.000 5965662.92 N 631205.76 E 0.000 3264.43 3331.48 3332.52 3397.15 Comment Dir Rate Decrease@ 12.000°/100ff:9433.37ff MD, 8677.69ft TVD End Dir: 9536.57flMD, 8689.18ftTVD Start Dir @ 12.000°/100ft: 9838.75ft MD, 8722.50ft TVD Tarc~et - N-10A Wp05 T1, Geological End Dir: 10032.35ft MD, 8746.97ft TVD Start Dir @ 12.000°/100ft: 10237.23ft MD 8788.50ft TVD T~arget .- N.-10A'Wp05 T2, L~eo~og~ca~ End Dir: 10401.59ft MD, 8793.91ft TVD Continued... 30 May, 2000 - 11:51 - 4 - DrillQuest 1.05.04c Sperry-Sun Drilling Services Proposal Report for N- I OA WPS - N- I OA Wp05 Revised: 9 March, 2000 North Slope Alaska Measured Depth Incl. Azim. (ft) 10600.00 97.907 304.139 10700.00 97.907 304.139 10800.00 97.907 304.139 10869.76 97.907 304.139 Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 8693.11 8766.61 1050.95 S 3305.54W 8679.35 8752.85 995.37 S 3387.53W 8665.60 8739.10 939.78 S 3469.51 W 8656.00 8729.50 901.00 S 3526.70W All data is in feet unless otherwise stated. Directions and coordinates are rela Vertical depths are relative to Well. Northings and Eastings are relative Global ~r~~[tes Northings'~k-~tings (ft)411~l~ ~lft) ~'~ ~' 631122.80 E ~6577~4'I~' 631039.84 E ~5 N 630956.88 E 5~.00 N 630899.00 E North. Dogleg Rate (°/100ft) 0.000 0.000 0.000 0.000 Alaska State Plane 4 PBU_WOA N Pad Vertical Section (ft) 3462.82 3528.49 3594.16 3639.97 Comment Total Depth: 10869.76ft MD, 8729.50ft TVD 4 1/2" Liner Tarqet - N-10A Wp05 T3, Geological The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Based upon Minimum Curvature type calculations, at a The Bottom Hole Displacement is 3639.97ft., in th, (True). of 10869.76ft., 255.669° (True). Continued... 30 May, 2000 - 11:51 - 5 - DrillQuest 1.05.04c Alaska hared ervlces riiling WELL NAME N-10A DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT [~ Permi~t Doctxm ,~tation Prepared: B Per~t Application %d, SDE~S: ¢~ ~.. Date: Permit Application Submitted: TA:~~ ~ Date: ~/~1/~ PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate Other(Explain): I APPROVAL TO PROCEED [ Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: WELL PERMIT CHECKLIST & OOL COMPANY WELL NAME ,/~/'0/~ PROGRAM: exp__ ADMINISTRATION A4~ DATE ENGINEERING DATE INIT CLASS ' .-"~:)~' V' GEOLOGY /D/L 1. Permit fee attached. 2. Lease number approPriate.~..~' .~..,:~. ,:',~.''-~- --' '~ "' * ' ':" "~ '",~'/'E~ ~-~ (' 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to '_"~.~-~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... dev ~ redrll v/ serv ~ wellbore seg ~ ann. disposal para req ~ GEOL AREA ~ '~'(...) UNIT# ON/OFFSHORE )N y NTM y .. ,..~c~\ \ Y N N N N N N APPR DATE 31. Data presented on potential overpressure zones ....... ~',d Y N , , . . , . . Se sm,oa.a ys,sofs, ,owg szo,es ............. Y N 33. Seabed condition survey (if off-shore) ............. //~ Y U ~,~, /[~,~--/ /,~..~~ V5~c./--z,-~-~ . 34. Contact name/phone for weekly progress reports [exploratory O~l~ Y N - ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and ... (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N ENGINEERING: UlC/Annular COMMISSION: Comments/Instructions: rn z -I -1- c:~nsoffice\wordian\diana\checklist (rev. 02/17/00) Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Thu Mar 01 15:12:02 2001 Reel Header Service name ............. LISTPE Date ..................... 01/03/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 01/03/01 Origin[ .................. STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/~D LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MM-00074 MARK HA_NIK STEVE LEWIS 500292050701 BP Exploration (Alaska), Inc. Sperry Sun 28-FEB-01 MWD RUN 2 AK-MM-00074 RANDY KRELL GAVIN KIDD MWD RUN 3 AK-MM-00074 RANDY KRELL GAVIN KIDD JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 AK-MM-00074 RANDY KRELL GAVIN KIDD MWD RUN 5 AK-MM-00074 RANDY KRELL GAVIN KIDD MWD RUN 6 AK-MM-00074 RANDY KRELL GAVIN KIDD JOB NUMBER: LOGGING ENGINEER: MAD RUN 6 AK-MM- 00074 RANDY KRELL OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RAi~GE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING GAVIN KIDD REMARKS: 8 liN 13E 4356 4742 .00 72.74 44.68 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 5913.0 6.125 7.000 9161.0 1. ALL DEPTHS ARE MEASURED DEPTHS(MD)UNLESS OTHERWISE NOTED. 2. MWD RUN 1 WAS DIRECTIONAL ONLY AND NOT PRESENTED. 3. MWD RUNS 2,3,AND 6 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4(EWR4) . 4. MWD RUNS 4 & 5 COMPRISED DIRECTIONAL,AND DGR. 5. DATA OVER THE FOLLOWING INTERVALS WERE ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS: RUN 2: 5747'MD/5307'TVD - 5913'MD/5440'TVD DGR LOGGED THROUGH CASING RUN 6: 9161'MD/8545'TVD - 9542'MD/8697'TV-D EWR4 LOGGED THROUGH HIGH DOGLEGS RUN 6: 10930'MD/8741'TVD - 9386'MD/8667'TVD EWR4 LOGGED WHILE POOH. 6. DIGITAL AND LOG DATA ARE DEPTH-SHIFTED TO A SCHLUMBERGER GAMMA RAY PDC LOG(MCNL) RUN ON 18 JULY 2000. MWD DATA ARE TIED TO THE PARENT WELL N-10 (ADJUSTMENT MADE FOR K_BE DIFFERENCES) AS WELL AS TIED TO THE MCNL OVER ITS DEPTH RANGE. 7. MWD RUNS 1-6 REPRESENT WELL N-10A WITH API#: 50-029-20507-01. THIS WELL REACHED A TOTAL DEPTH(TD)OF 10930'MD/8741'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SRAT = SMOOTHED TOOL RUNNING SPEED WHEN NOT DRILLING CURVES WITH AN 'M' SUFFIX DENOTE MAD PASS DATA $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEAIDER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 5700.0 10869 0 FET 5876.5 10876 0 RPX 5876.5 10876 0 RPS 5876.5 10876 0 RPD 5876.5 10876 0 RPM 5876.5 10876 0 ROP 5908.0 10925 5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 5700.0 5705.5 9129.5 9133.5 9150.0 9153.5 9159.0 9164.5 EQUIVALENT UNSHIFTED DEPTH 9167 9191 9197 9204 9210 9219 9222 9225 9230 9238 9246 9248 9250 9258 9266 9271 9277 9284 9289 9296 9303 9305 9313 9338 9348 9354 9369 9384 9399 9430 9443 9449 9482 9494 9502 9508 9519 9522 9529 9538 9543 9562 9577 9580 9594 9611 9616 9625 9630 9644 9653 9661 9675 9692 9711 9716 9718 5 5 0 5 0 5 0 5 5 0 0 0 5 0 0 5 0 0 5 5 0 5 0 0 5 5 0 5 0 5 5 0 5 5 5 5 0 5 0 5 5 5 0 5 0 5 5 5 0 0 0 0 0 0 0 5 0 9174 9200 9205 9213 9218 9227 9230 9233 9239 9247 9253 9255 9257 9265 9273 9279 9285 9291 9296 9303 9307 9310 9319 9344 9353 9359 9373 9389 9404 9438 9449 9456 9489 9501 9509 9515 9525 9529 9536 9545 9550 9569 9582 9586 9598 9616 9621 9632 9636 9649 9657 9668 9683 9699 9714 9721 9725 0 0 5 0 5 5 5 5 0 0 0 5 0 0 5 0 5 0 0 0 5 5 0 5 5 0 5 0 0 0 0 0 0 5 5 0 0 5 0 5 0 5 5 0 0 5 5 0 0 0 5 0 0 5 5 5 o 9721 9726 9734 9751 9762 9783 9796 9808 9816 9829 9839 9847 9909 9918 9924 9929 9931 9951 9959 9964 10019 10034 10050 10058 10072 10075 10092 10101 10110 10112 10114 10119 10124 10131 10141 10151 10153 10155 10169 10198. 10209 10216 10230 10241 10251 10258 10263 10267 10273 10277 10282 10287 10288 10297 10326 10349 10368 5 0 0 5 0 5 0 0 5 5 5 0 5 5 0 5 5 0 0 0 0 0 5 0 5 5 0 0 0 0 5 5 0 5 5 0 5 5 0 5 0 0 0 0 5 0 5 5 5 0 0 0 0 5 5 5 5 9728 9733 9741 9755 9766 9789 9801 9813 9822 9834 9845 9851 9913 9922 9930 9935 9938 9961 9969 9974 10025 10041 10057 10064 10078 10084 10098 10108 10118 10121 10122 10127 10133 10141 10151 10159 10162 10165 10177 10205 10220 10227 10238 10249 10263 10267 10272 10277 10280 10285 10291 10295 10298 10306 10335 10354 10374 0 5 0 0 5 5 0 5 5 5 0 5 0 0 0 0 0 0 0 0 5 0 0 0 5 0 5 0 0 0 5 5 0 5 5 5 5 0 5 5 5 0 0 5 0 5 0 5 0 5 5 5 5 0 0 0 5 10425 0 10457 0 10474 0 10479 0 10483 0 10494 0 10501 5 10511 5 10518 0 10539 0 10548 0 10552 0 10558 5 10561 5 10581 5 10605 0 10610 0 10612 0 10614 0 10630 5 10642 0 10661 5 10686 5 10698 5 10712 0 10719 0 10731 5 10743 0 10756 0 10763 5 10784 0 10787 5 10816 5 10818 5 10820 0 10822 5 10925 5 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS :~ 10430 5 10460 0 10478 0 10484 0 10488 0 10498 5 10504 0 10516 0 10523 5 10545 5 10555 5 10558 0 10565 0 10567 5 10587 5 10609 5 10613 0 10615 0 10620 5 10634 0 10648 5 10667 5 10691 5 10704 0 10716 5 10723 5 10736 0 10748 5 10762 0 10769 5 10789 0 10793 0 10822 0 10823 0 10824 5 10827 0 10930 0 BIT RUN NO MERGE TOP MERGED NLAIN PASS. $ Data Format Specification Record 5705 5 5943 5 6022 5 9161 0 9334 5 9543 5 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet MERGE BASE 5943 5 6022 5 9161 0 9334 5 9543 5 10930 0 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name DEPT ROP GR RPX RPS RPM RPD FET Service Order Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 MWD FT/H 4 1 68 4 2 MWD API 4 1 68 8 3 MWD OHMM 4 1 68 12 4 MWD OHMM 4 1 68 16 5 MWD OHMM 4 1 68 20 6 MWD OHMM 4 1 68 24 7 MWD HOUR 4 1 68 28 8 Name Service Unit Min Max DEPT FT 5700 10925.5 ROP MWD FT/H 0 240.67 GR MWD API 15.3 614.28 RPX MWD OHMM 0.53 2000 RPS MWD OHMM 0.55 2000 RPM MWD OHMM 0.55 2000 RPD MWD OHMM 0.02 2000 FET MWD HOUR 0.0747 130.541 Mean Nsam 8312.75 10452 72.0127 10016 99.0636 10339 19.5306 10000 20.9807 10000 36.259 10000 36.8305 10000 4.71029 10000 First Reading 5700 5908 5700 5876.5 5876.5 5876.5 5876.5 5876.5 Last Reading 10925.5 10925.5 10869 10876 10876 10876 10876 10876 First Reading For Entire File .......... 5700 Last Reading For Entire File ........... 10925.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED M_AD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RPM RPD RPS RPX FET P~AT $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: START DEPTH 9330 0 9335 5 9335 5 9335 5 9335 5 9335 5 9383 0 STOP DEPTH 10870 0 10880 0 10880 0 10880 0 10880 0 10880 0 10924 5 MAD RUN NO. MAD PASS NO. MERGE TOP 6 1 9387.5 MERGED MAD PASS. $ MERGE BASE 10930.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined ~bsent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 P~AT MAD FT/H 4 1 68 4 2 GR MAD APt 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHMM 4 1 68 20 6 RPD MAD OHMM 4 1 68 24 7 FET NLAD HOUR 4 1 68 28 8 Name Service Unit Min Max Mean Nsam DEPT FT 9330 10924.5 10127.3 3190 RAT MAD FT/H 0.45 815.82 386.109 3084 GR MAD API 10.79 480.08 43.7837 3081 RPX MAD OHMM 1.03 2000 36.7558 3090 RPS MAD OHMM 1.34 2000 37.7547 3090 First Reading 9330 9383 9330 9335.5 9335.5 Last Reading 10924.5 10924.5 10870 10880 10880 RPM MAD OHMM 1.08 2000 RPD MAD OHMM 0.58 2000 FET MAD HOUR 4.0616 84.0492 40.7685 3090 51.2291 3090 35.0831 3090 9335.5 9335.5 9335.5 10880 10880 10880 First Reading For Entire File .......... 9330 Last Reading For Entire File ........... 10924.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 PhysiCal EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5705.5 5943.0 ROP 5913.5 5943.5 $ LOG HEADER DATA DATE LOGGED: 20-JUN-00 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: .0 Insite 65.4099960327148 Memory 5943.0 MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MA~X CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 37.4 TOOL NUMBER PBO1550HWGR6 LSND 9.60 55.0 9.0 1000 3.6 .000 .000 .000 .000 .0 94.0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 5705.5 5943.5 5824.5 477 First Reading 5705.5 Last Reading 5943.5 ROP MWD010 FT/H 0.38 7.84 GR MWD010 API 17.99 69.34 4.29459 45.5504 61 476 5913.5 5705.5 5943 . 5 5943 First Reading For Entire File .......... 5705.5 Last Reading For Entire File ........... 5943.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH RPD RPM RPS RPX FET GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 5714 0 5714 0 5714 0 5714 0 5882 0 5943 5 5944 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : STOP DEPTH 5990 0 5990 0 5990 0 5990 0 5990 5 5981 0 6022 5 21-JUN- 00 Insite 65.4100036621094 Memory 6022.0 BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 37.0 37.0 TOOL NUMBER PB01550HWGR6 PBO1550HWGR6 Water Based 9.65 48.0 9.3 50O 5.8 1.300 .993 2.200 3.100 71.0 95.0 71.0 71.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RP~ MWDOZ0 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 RPM MWD020 OHMM 4 1 68 RPD MWD020 OHMM 4 1 68 FET MWD020 HOUR 4 1 68 16 20 24 28 Name Service Unit Min Max DEPT FT 5714 6022.5 ROP MWD020 FT/H 0 150.47 GR MWD020 API 49.26 76.76 RPX MWD020 OHMM 0.81 2000 RPS MWD020 OHMM 3.01 2000 RPM MWD020 OHMM 1.07 2000 RPD MWD020 OHMM 0.02 2000 FET MWD020 HOUR 0.07 3.33 Mean Nsam 5868.25 618 41.7558 158 61.196 76 84.3172 553 96.3198 553 663.097 553 759.614 553 1.59743 218 First Reading 5714 5944 5943 . 5 5714 5714 5714 5714 5882 Last Reading 6022.5 6022.5 5981 5990 5990 5990 5990 5990.5 First Reading For Entire File .......... 5714 Last Reading For Entire File ........... 6022.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 R3~W MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5981.5 9119.5 RPS 5991.0 9128.5 FET 5991.0 RPM 5991.0 RPX 5991.0 RPD 5991.0 ROP 6023.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ 9129.0 9128.5 9128.5 9128.5 9161.0 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down 25-JUN-00 Insite 65.4099960327148 Memory 9161.0 11.6 33.5 TOOL NUMBER LSND 10.20 42.0 9.2 450 3.1 1.300 .589 2.200 3.100 71.0 165.0 71.0 71.0 Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name DEPT ROP GR RPX RPS RPM RPD FET Service Order Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 MWD030 FT/H 4 1 68 4 2 MWD030 API 4 1 68 8 3 MWD030 OHMM 4 1 68 12 4 MWD030 OHMM 4 1 68 16 5 MWD030 OHMM 4 1 68 20 6 MWD030 OHMM 4 1 68 24 7 MWD030 HOUR 4 1 68 28 8 Name Service Unit DEPT FT ROP MWD030 FT/H GR MWD030 API RPX MWD030 OHMM RPS MWD030 OHMM RPM MWD030 OHMM RPD MWD030 OHMM FET MWD030 HOUR Min 5981.5 0 23 50 16 0 56 0 56 0 57 0 58 0 23 Max Mean Nsam 9161 7571.25 6360 213.75 89.4761 6257 378.88 128.544 6277 8.09 2.12889 6276 7.04 2.0796 6276 6.5 2.06706 6276 5.78 2.10869 6276 28.59 1.09582 6277 First Reading 5981.5 6023 5981.5 5991 5991 5991 5991 5991 Last Reading 9161 9161 9119.5 9128.5 9128.5 9128.5 9128.5 9129 First Reading For Entire File .......... 5981.5 Last Reading For Entire File ........... 9161 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name'. .......... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9120.0 9290.5 ROP 9161.5 9334.5 $ LOG HEADER DATA DATE LOGGED: 29-JUN-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.15 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) : 9334.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 19.2 MAXIMUM ANGLE: 72.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER pb01557wf4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUIKDRIL-N 8.40 42.0 8.8 200 12.0 .000 .000 .000 .000 .0 168.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 9120 9334.5 9227.25 430 ROP MWD040 FT/H 0.46 47.71 20.6855 347 GR MWD040 API 52.36 614.28 131.262 342 First Reading 9120 9161.5 9120 Last Reading 9334.5 9334.5 9290.5 First Reading For Entire File .......... 9120 Last Reading For Entire File ........... 9334.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9291.0 9493.0 ROP 9335.0 9543.5 $ LOG HEADER DATA DATE LOGGED: 30-JUN-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.15 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) : 9543.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 78.1 MAXIMUM ANGLE: 80.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER pb01557wf4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUIKDRIL-N 8.40 44.0 8.9 200 9.2 .000 .000 .000 .000 .0 165.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 9291 9543.5 9417.25 506 ROP MWD050 FT/H 2.7 75.91 28.6612 418 GR MWD050 API 24.52 446.56 104.17 405 First Reading 9291 9335 9291 Last Reading 9543.5 9543.5 9493 First Reading For Entire File .......... 9291 Last Reading For Entire File ........... 9543.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RJkW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 9493 5 9494 5 9494 5 9494 5 9494 5 9494 5 9544 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10873 5 10880 5 10880 5 10880 5 10880 5 10880 5 10930 0 03 -JUN- 0 0 Insite 65.4399948120117 Memory 10930.0 78.0 99.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER PB01558H PB01558H BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUIKDRIL-N 8.40 40.0 9.1 300 9.2 1.200 .421 .850 3.100 64.0 195.0 62.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) EWR FREQUENCY (HZ) REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD060 FT/H 4 1 68 GR MWD060 API 4 1 68 RPX MWD060 OHMM 4 1 68 RPS MWD060 OHMM 4 1 68 RPM MWD060 OHMM 4 1 68 RPD MWD060 OHMM 4 1 68 FET MWD060 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 9493.5 10930 ROP MWD060 FT/H 2.15 240.67 GR MWD060 API 15.3 129.22 RPX MWD060 OHMM 13.96 58.59 RPS MWD060 OHMM 15.76 76.69 RPM MWD060 OHMM 15.75 74.9 RPD MWD060 OHMM 18.05 75 FET MWD060 HOUR 0.68 20.07 Mean 10211.8 48 4872 37 8966 30 8359 36 4875 39 2401 42 4979 2.33431 Nsam 2874 2773 2761 2773 2773 2773 2773 2773 First Reading 94 93 . 5 9544 9493 . 5 94 94.5 94 94 . 5 94 94 . 5 94 94.5 94 94.5 Last Reading 10930 10930 10873 5 1088O 5 10880 5 10880 5 10880 5 10880 5 First Reading For Entire File .......... 9493.5 Last Reading For Entire File ........... 10930 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NTJMBER: 6 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9336 5 10874 5 FET 9342 0 10884 5 RPD 9342 0 10884 5 RPM 9342 0 10884 5 RPS 9342 0 10884 5 RPX 9342 0 10884 5 RAT 9387 5 10929 0 $ LOG HEADER DATA DATE LOGGED: 03 - JUN- 00 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 65.4399948120117 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) : 10930.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 78.0 MAXIMUM ANGLE: 99.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : TOOL NUMBER PB01558H PB01558H BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 QUIBiDRIL-N 8.40 40.0 9.1 300 9.2 1.200 .421 .850 3.100 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD061 API 4 1 68 4 2 RPX MAD061 OHMM 4 1 68 8 3 RPS MAD061 OHMM 4 1 68 12 4 RPM MAD061 OHMM 4 1 68 16 5 RPD MAD061 OHMM 4 1 68 20 6 FET MAD061 HOUR 4 1 68 24 7 RAT MAD061 FT/H 4 1 68 28 8 64.0 195.0 62.0 65.0 Name Service Unit DEPT FT GR MAD061 API RPX MAD061 OHMM RPS MAD061 OHMM RPM MAD061 OHMM RPD MAD061 OHMM Min Max Mean Nsam 9336.5 10929 10132.8 3186 10.79 480.08 44.1992 3077 1.03 2000 37.5441 3086 1.34 2000 38.1878 3086 1.08 2000 40.5288 3086 0.58 2000 50.9968 3086 First Reading 9336.5 9336.5 9342 9342 9342 9342 Last Reading 10929 10874.5 10884.5 10884.5 10884.5 10884.5 FET MAD061 HOUR 4.0616 84.0492 RAT M_AD061 FT/H 0 . 45 815 . 82 35.1063 3086 386.183 3084 9342 10884.5 9387.5 10929 First Reading For Entire File .......... 9336.5 Last Reading For Entire File ........... 10929 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/03/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 01/03/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 01/03/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File