Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
207-127
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer W-45 (PTD #2071270) TIFL Passed Date:Monday, October 10, 2022 5:14:59 PM Attachments:image002.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Saturday, October 8, 2022 1:33 PM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Stan Golis <sgolis@hilcorp.com> Subject: OPERABLE: Producer W-45 (PTD #2071270) TIFL Passed Mr. Regg, Producer W-45 (PTD # 2071270) TIFL passed post gas lift valve changeout on 10/08/22. At this time, the well is classified as OPERABLE. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Monday, September 26, 2022 1:55 PM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Stan Golis <sgolis@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Producer W-45 (PTD #2071270) IA over MOASP, failed TIFL Mr. Regg, Producer W-45 (PTD # 2071270) was found to have IA casing pressure above MOASP on 09/23/22. The pressure was 2102 psi. On 09/26/22 DHD performed a failing warm TIFL. The failed TIFL indicates a failure in a well barrier. The well will now be classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan Forward: 1. Slickline: Replace OGLV 2. DHD: TIFL 3. Well Integrity: Additional diagnostics as needed. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone numberis listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer W-45 (PTD #207127) Sustained IA casing pressure over NOL Date:Saturday, June 11, 2022 10:49:14 AM Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Saturday, June 11, 2022 8:31 AM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: OPERABLE: Producer W-45 (PTD #207127) Sustained IA casing pressure over NOL Mr. Regg, Producer W-45 (PTD #207127) IAP was reported by operations and confirmed to be over NOL at 2101 psi on 6/9/21. A subsequent TIFL passed on 6/10/22. The well will remain classified as OPERABLE. Please respond with any questions. John Condio (covering for) Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate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y Samantha Carlisle at 8:45 am, Mar 21, 2022 'LJLWDOO\VLJQHGE\6WDQ*ROLV '1FQ 6WDQ*ROLV RX 8VHUV 'DWH 6WDQ*ROLV $&7,9,7<'$7(6800$5< :(//6,21$55,9$/'62127,),(' DGSHUI 3(5)25$7( 86,1*63)'(*3+$6('+6&/2$'(' :*50$;)25&(&+$5*(6 5()(5(1&(/2*'(37+6 0' 12&+$1*(,178%,1*35(6685(2)36, &255(/$7('726/%0(025<3(6685($1'7(03(5$785(6859(< '$7('$35 :(///()76,21'(3$5785( 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8: 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU W-45 Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 207-127 50-029-23369-00-00 13475 Conductor Surface Intermediate Production Liner 8888 78 3600 9685 3928 13388 20" 9-5/8" 7" 4-1/2" 8900 30 - 108 29 - 3629 26 - 9712 9545 - 13473 30 - 108 29 - 3374 26 - 8602 8471 - 8888 None 3090 5410 7500 None 5750 7240 8430 10113 - 13375 4-1/2" 12.6# 13Cr80 24 - 9551 8896 - 8901 Structural 4-1/2" Baker S3 Packer 9474 9474 8412 Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0047452 No SSSV Installed 24 - 8816 8412 N/A N/A 170 556 2478 1605 272 321-578 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 658 1066 3836 1535 289 By Samantha Carlisle at 8:58 am, Nov 30, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.11.29 18:01:37 -09'00' Stan Golis (880) , ADL 028263 SFD 12/3/2021MGR29DEC2021 SFD 12/3/2021 RBDMS HEW 11/30/2021 DSR-11/30/21 ACTIVITY DATE SUMMARY 11/20/2021 CTU #9: 1.75" coil, 0.145" WT. Move from V-111 to W-45. Rig up on W-45. Standby to shut in and kill well. ** Job Continued on 11/21/2021** 11/21/2021 CTU #9: 1.75" coil, 0.145" WT. Move from V-111 to W-45. Shut in well, bleed IA, and freeze protect flowline. RIH w/ 1.90" CTC, 2.12 MHA (3/4" DISCO), 2.375" READ CASED HOLE MEM GR/CCL CARRIER, 2.13" XO, 3.0" DJN, OAL: 13.01'. LOG FROM 12,000' to 11,200' AT 50 FPM. PAINTED FLAG AT 11,350'. POH TO SURFACE AND DOWNLOAD LOGGING DATA. Log data shows a +9' correction making corrected EOP at flag = 11,347.78'. Standby for perf guns. ** Job Continued on 11/22/2021** 11/22/2021 T/I/O = VAC/170/30. Temp = SI. IA FL (CT). ALP = 1480 psi, SI @ CV. IA FL @ 1700' (30 bbls). CT in control of valves upon departure. 04:00 11/22/2021 CTU #9: 1.75" coil, 0.145" WT. Job Objective: Drift/Log & Extended Adperf Standby for perf guns. DHD shot an IA fluid level at 1700'. Notified operator for post- job POP. Bullhead kill well with 1% KCl. M/U 2.5"6spf 2506 PJ Omega perf guns and RIH. Perforate from 11,720' to 11,573' and 11,480' to 11,366'. POH w/ spent guns. L/D guns and BHA. Bullhead partial freeze protect as pad operator intends to POP as soon as we leave. Pad operator notified of well status. Rig down ** Job Continued on 11/23/21** 11/23/2021 CTU #9: 1.75" coil, 0.145" WT. Job Objective: Drift/Log & Extended Adperf Complete rig down. RDMO to P2-33. ** Job Complete** Daily Report of Well Operations PBU W-45 Perforate from 11,720' to 11,573' and 11,480' to 11,366'. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU W-45 Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 207-127 50-029-23369-00-00 341 H ADL 0047452 13475 Conductor Surface Intermediate Production Liner 8888 78 3600 9685 3928 13388 20" 9-5/8" 7" 4-1/2" 8900 30 - 108 29 - 3629 26 - 9712 9545 - 13473 2620 30 - 108 29 - 3374 26 - 8602 8471 - 8888 None 3090 5410 7500 None 5750 7240 8430 10113 - 13375 4-1/2" 12.6#13Cr80 24 - 95518896 - 8901 Structural 4-1/2" Baker S3 Packer No SSSV Installed 9474, 8412 No SSSV Installed Date: Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 PRUDHOE BAY, PRUDHOE OIL 11/25/2021 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2021 Approved application is valid for 12 months from the date of approval. 321-578 By Meredith Guhl at 7:24 am, Nov 12, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.11.11 07:15:21 -09'00' Stan Golis (880) DLB 11/12/2021 10-404X MGR12NOV21 DSR-11/12/21dts 11/12/2021 11/15/21 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2021.11.12 17:45:05 -10'00' RBDMS HEW 11/15/2021 CTU Extended Perf W-45 PTD:207-127 Well Name:W-45 API Number:50-029-23369-00 Current Status:Producing Rig:CTU & Surface Deployed TCP Guns Estimated Start Date:11/25/21 Estimated Duration 3days Regulatory Contact:Abbie Barker (907) 564-4915 (O) First Call Engineer:Wyatt Rivard (907) 777-8547 (O)(509) 670-8001 (M) Second Call Engineer:Brodie Wages (907) 564-5006 (O)(713) 380-9836 (M) Current Bottom Hole Pressure:3500 psi @ 8,800’ TVD 7.7 PPGE | (Offset W-40 in July 2021) Maximum Expected BHP:3500 psi @ 8,800’ TVD 7.7 PPGE | (Offset W-40 in July 2021) Max. Anticipated Surface Pressure:2620psi (Based on .1psi/ft gas gradient) Last SI WHP:1550 psi (Taken on 10/1/21) Min ID:3.725” X NIP at 9538’ MD Max Angle:102 deg at 12874’ Reference Log:SLB Mem Coil Flag dated 8/17/10 Brief Well Summary: W-45 is a high water cut gas lifted Ivishak producer. There are several unperforated Z4 targets expected to increase oil rate and improve WC. Objective:Utilize CTU to surface deploy TCP guns to add new perfs and improve WC. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the extended perfs guns. This is generally done during the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit, spot ancillary equipment and PT. 2. Bullhead ~230 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation to kill well ahead of extended perforations and fluid pack well for logging. a. Wellbore volume = 10200’ X .0152 bpf = 160 bbls b. Freeze protect tubing as needed. 3. MU GR/CCL Logging tools and RIH. 4. Log up from ~11650’ MD to 11200’ MD stopping at ±11,350’ MD to paint flag. 5. POOH and confirm good data. Obtain corrected flag. 6. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole full. 7. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or equivalent as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 8. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. * -00 DLB CTU Extended Perf W-45 PTD:207-127 9. Break lubricator connection at QTS and begin makeup of 2.5” or 2-7/8” TCP guns per Table 1: W-45 Proposed Extended Ad-Perf Gun Run below. a. Proposed gun run assumes guns can be conveyed to bottom in single 354’ (Loaded+Blanks) assembly. Run may be split into two separate runs if torque/drag modeling dictates. Gun Run #Perf Top Perf Bottom Perf Length 1 ±11366 ±11480 ±114 ±11573 ±11720 ±147 Total ±261 Table 1: W-45 Proposed Extended Ad-Perf Gun Run 10. RIH and correlate to flag. 11. Pickup and perforate intervals per Table 1: W-45 Proposed Extended Ad-Perf Gun Run. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well dead and hole full. 13. Review wellcontrol steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 14. RDMO CTU. 15. RTP or FP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet Standing orders flow chart included with this sundry request. *See note above regarding kill methods if pressure observed at surface after perforating. MU PCE. Pressure test QTS. CTU Extended Perf W-45 PTD:207-127 Wellbore Schematic -00 DLB CTU Extended Perf W-45 PTD:207-127 Proposed Schematic -00 DLB CTU Extended Perf W-45 PTD:207-127 Coiled Tubing BOPs CTU Extended Perf W-45 PTD:207-127 Equipment Layout Diagram CTU Extended Perf W-45 PTD:207-127 Standing Orders for Open Hole Well Control during Perf Gun Deployment CTU Extended Perf W-45 PTD:207-127 W-45 Tie-In Log CTU Extended Perf W-45 PTD:207-127 CTU Extended Perf W-45 PTD:207-127 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: November 10, 2021Subject: Changes to Approved Sundry Procedure for Well W-45Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date RECEIVED STATE OF ALASKA 411,LASKA OIL AND GAS CONSERVATION COMMIS DEC 1 2 2017 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed CC Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Ope ti ❑ Suspend ❑ Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 207-127 3. Address: P.O.Box 196612 Anchorage, Development 21 Exploratory 1:1 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-23369-00-00 7. Property Designation(Lease Number): ADL 0047452 8. Well Name and Number: PBU W-45 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 13475 feet Plugs measured feet true vertical 8888 feet Junk measured feet Effective Depth: measured 13388 feet Packer measured 9472 feet true vertical 8900 feet Packer true vertical 8410.56 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"215.5#A-53 28-108 28-108 Surface 3600 9-5/8"40#L-80 27-3627 27-3372 5750 3090 Intermediate 9685 7"26#L-80 25-9711 25-8601 7240 5410 Production Liner 3928 4-1/2"12.6#13Cr8 9544-13472 8470-8888 8430 7500 Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 22-9549 22-8474 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCA 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 278 1128 2025 1458 258 Subsequent to operation: Shut-In 1400 360 14.Attachments:(required per 20 AAC 25 070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development (I Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I7! Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Peru,Cale Contact Name: Peru,Cale Authorized Title: Petroleum E gineer Contact Email: Cale.Peru(a)bp.com Authorized Signature: Date: i 2.I'(//7 Contact Phone: +1 9075644522 Form 10-404 Revised 04/2017 ,,/ V T'L1/2-I J / �- s^S € ° 1 3 2017 ��fl. a IO �'rd�a7 `TiLI, f Submit Original Only • • t5t " Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary December 11, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Addition of Perforations for Well W-45, PTD # 207-127. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • d N co m f� CO N- L0 Co co co — co I� N co CO r O - r 0) v- N- CO _ V LO o N- M 0) V' 11 ,- 0540 N- r `- CO M O) O N oo N CO r O CO O CO NI" N- CD O CO CO LO O r 00 O O O O O) 6) CA O ,=', 0) o) O oo O o) O p CO CO CO CO CO CO O CO CO CO CO CO CO > F • 0- 0 1- 0o r M N- N r 0 r M d- Ln O M N .0 O Nn O LN LO �. cr Nr N CO LO N r 0. Cp A- N- 1- r 0 O r- N M M r A- LO O V- 0 o O N o L V CO r N- M CO M N r O CO W 0 0 0 0 0 0 M O O O _ M 0 0 0 0 0 0) > p CO O CO CO 00 CO O CO CO CO 00 CO CO CO CO 0 > 2 I- w CC 0 ❑ ❑ W Z N W LU LLI O a • I- 1- J W U O Y O m 00 ‹ Y Y F g CO r 0 CO O O LO Ln O o O o 0 0 U) LO Lf) Ln - U U w W w L N CO O O r oo CO 0o ti CS) r N O LO O CO N- _J .--1 _1 Q Q (n C W r M N CO O r N- O O O r N N N MW a a'M < < < 0 Z 0C^ N O O O r r N N N N N M M M M M M M 0 U 0 J W W W r r r r r r r r r r r r r r r r r Q Q Q 0 Q Q 4_ 0 a. H. t 2 w w w W 222ZDe Q Z O Z 0 L 2 2 2 0 0 ai u) cn cn RS Tr -1-+ I Q a H CD .c M O LU o O O o O o 0 0 o O Ln Ln Ln Ln p_ r Ln oo O O N- N- LU Ln N- O O N- M N- Ln o /y► y r r N r Ln O O O r r N N M M + C6.1 L^L p O O O r '- N N N N N N C") M M M M M + L r r r r r r r r r r r r r r cI3 ro L co 2 to -1 _ 1- I-d J da. 0 CC L -O cn cn U7 cn cn a) a a 0 0 c O LL LL LL LL LL_ LL CrW CCLL. EtLL LL LL LL. LL ElMQ- 4- 0- 0- dWW WMwwMMMMM `000QQQQMMdQMdQQQQQ a. 0 t a a 0 w J ❑ W 0 M N- CO N- 000 N- N- 0 0 0 p 00000 C7 C7 0 -J p r = ,--- = r r . . . . . ❑ DD Q c O 0 O 0 0 0 0 0 0 0 0 o O o 0 0 0 W J J W Z o N N N N N N N N N N N N N N N N N Z W a. d Q WW N CO Ln W WWWw LN_ _ r J CC 0 al Wu_ uj Q0 r r N N CO N 0) CO W Q ❑ ❑ ❑ J J ❑ ❑ o" a. r r r r r O Q Q m mJ J 11 w d cC a) E ca z Ln Ln Ln Ln in in Ln Ln Ln Ln LO Ln Ln Ln Ln LO Ln 3vstvvvv vv � i i i i i i � i i i i i i i i i i W a. Cn 0 11 N 12 Li- CCI • I Packers and SSV's Attachment PBU W-45 SW Name Type MD TVD Depscription W-45 TBG PACKER 9471.95 8410.56 4-1/2" Baker S-3 Perm Packer W-45 PACKER 9555.4 8479.27 5" Baker ZXP Top Packer • • -o X Z 0-O 2 N U) 7 N H I F- a. (NI W H co 0 �j W CC O Z w 0 0 (n11 0 LZ a „-x0 =a N O 11 p O o _ O a I D 3 LL M 0I O W w z � a Q o o c u _� �� 0 J DCO sZ � 3 # U) 0U) ad a LU L.L. b Q JLTI E N o p J p U) ° W o = a >, E N_ a Woo�o Jia amu. LL c a a) 0- 2z0F- = Ua- a' >- O ° E o a) u- JrYU) u- 0Uo I- W ° 1 7 LL _C - J ° J _ N 2O) a 0 ( _cw 0) --/0 d 000- 0') Ili > _ rn Q p � � Q in 3W oa ° � Uo -z II 1Op CO O >- ooW a ( � z L cn i--.2 CO - I.- C81) E 7.3 co 2 •,x � o a Q2w EL 0 3 r` 0MW � 0WI � = Q i� � Oz 0 Cm 0 0 � a (n � a � cnHp � 1- Q. p 2 < 0 C 3J c - N Nf- pv° I- U3aQZ cn 0 � chu Z Q pgU) * W C ' TO -'- T 00Q N 73 et ach W a wt W Q aU a. u) toF-' 2 W co CD '' CC „ � OO _i an* o _ Ew mWQma W ch0aX N Li LLJ ZLU ViUF-- > ° Lup >(/) u) H X a" Wo t a ° w _ and SO zwa0WEUQ < L d o0z m 0 -1 - w w 0 Mpo Ili u) 0 mCH. N0 0. r- v- U (p \ NU ` 2O O O ci- Lct 7 J > C (O N 07 Z _ c`) NZ Z O 0 3II - - cc Li_- W D o m W Q C cC O > > >zU) o ° ca F- - § ZJ -O ( Z > O p Z COLu a p Ncr) !+ a p a .- N Oap N NU) WQpOLL QO O zz O Q = Z aN -0 O a p o QoN- Lo O L C'D � � �pW _cN \ � o OQcQ �p W 0 E - 0OCET) III 1-.•° � Wa olcl - a woZr u- Qup z DQno p = �rN1 ( a ° oa5 - Z -a a) Z11 Z 75 L° Z <-- .- -- -- X >- CD _ LijoWLF0 J 0 c 7 � � 00 -0 � Hv- p Q O � a ZpJ C O Z p ZII ~ ° ~ U00 a c) 15- OOOo O = JaQ _ QU) ° p � 0 s OJo5cni - OcC0NU - Q2x - vaCzF- --- O r D z p W -J 0 Nm � J Cal ‘g a� a � ° pOc�i `' OO <__J 003° u_ a z W >W> s) O O p = 0C° z x- a 2 Z 11 _119 g Q 0 a 0 1 «� a s Z > -moi p : >w - p ? - 7 5 -x p 2 W p Q W J O W Z_ « O a 0 J W J : M It > Z X 1' f- a LL + X z J a a O a Q D o W : O CO W tiQ `oN- N- N- 0 C7 0 ,-- CD ›- N N N N N N co H .- .- O N- N� Ta N N rm CO N N N r r ,- ,- 0 U Q TREE= 4-1/16"CNV V1aU- D= FRAC • SA NOTES: WELL ANGLE>70"@ 10286'•"" ACTUATOR= BAKERC W-45 4-1/2"TBG& LNR""" KB.ELEV= 79.7' BF.ELEV= 51.2' 1 1019' —19-5/8"TAM PORT COLLAR KOP= 800' 11.43x Angie= 102"@ 12874' 2279' H141/2"HES X MP,D=3.813" Datum LI)= 10089' I GAS LIFT MANDRIELS Datum TVD= 8800'SS ST MD IVO DEV TYPE VLV LATCH FORT GATE 20'CONDUCTOR. — 777 8 2510 2432 31 KBG2 DM( BK 0 04/14/10 7 3669 3409 31 KBG2 DOLE BK 12 08/20'11 9-5/8"CSG,404,L-80 BTC,D=8.835' H 3629' , 6 4704 4318 30 KBG2 DMY BK 0 04/14/10 7"CSG,264,L-80 TCI XO TO L-80 BTC-M — 502T X - X 5 5946 5372 29 KBG2 DOLE BK 16 08i2Q'11 4 6686 6025 31 KBG2 DMI' BK 0 12/24/07 3 7341 6598 27 KBG2 SO BK 20 08/20/11 2 18540 7628 36 KBG2 DRAY BK 0 12/24/071 {Minimum ID = 3.725" © 9538' 1 1 1 9364 8319 32 KBG2 LAY BK 0 12/24/07 4-112" HES XN NIPPLE ' 1 1 9443' H4-1/2"HES X NIP,D=3.813" Z , 9474' —7"X 4-112"BKR S-3 FKR,D=3.875" ' 9507' —14-1/2"HES X NFP,D=3-813' ' , 9539' —4-1/2"1-1ES XNNIP,iD=3.725' TOP OF 4-1/2"LAR --1 9545' 9545' H7"X 5'BKR ZXP LW w/11 TIEBACK,D=4.410" 4-1/2"TBG, 12.64,13CR VAM TOP, —{ 9551' 1 L./ CI955V —4-1/2'\LEG,D=3.958' .0152 bpf,D=3.958' L —ELM)TT NOT LOG R 7"CSG,264,L-80 BTC-M H 9712' 0383 bpf,D=6276' 9566' —7"X 5"BKR FLEX-LOCK HGR,D=4.430" 9576' 1-15"X 4-12"XO,D=3.930" PERFORATION SLA.4YIRY REF LOG: SWS VISION ON 12/17/07 _ ANGLE AT TOP PSiF 46"@ 10113' Note:Refer to Production DB for historical perf data SIZE SPF 1INTERVAL Opn/Sqz DATE 3-3/8" 6 10113- 10121 0 11/27/17 2-7/8" 6 I 10146- 10176 0 12/04/16 3-3/8" 6 10286- 10306 O 11/27/17 , 2-7/8' 4 11180- 11200 0 08/18/10 2-7/8' 4 11590- 11610 0 08/18/10 ,,, 2-7/8" 4 12070- 12085 0 12/22/07 2-7/8" 4 12070- 12085 0 08/17/10 ,, 2-7/8" 4 12170- 12185 0 I 12/22/07 2-7/8' 4 12760- 12780 0 12/22/07 2-7/8" 4 I 12950- 13010 O 12/22/07 I Oh. 2--718" 4 12970- 12990 0 08/17/10 `. 2-7/8' 4 13100- 13120 O 12/22/07 2-7/8" 4 13170- 13200 0 08/17/10 2-7/8" 4 13235- 13255 0 08/16/10 Pg7D — 13388' 2-7/8" 4 13275- 13295 O 08/15/10 2-7/8" 4 13315- 13335 O 08/15/10 2-7/8" 4 13355- 13375 0 08/15/10 4-1/2"LNR,12.64,13CR VAM TOP,.0152 bpi,D=3.958" I— 13473' DA le REV BY COMLENTS DATE FZEV BY COL U1TS PRUDHOE BAY UMT 12/25/07 N9ES ORIGINAL COMPLETION 08/15/11 GJB/PJC GLV GO(8/11/11) WELL: W-45 04/28/08 7/PJC GLV C/O 08/22/11 CJNPJC GLV GO(08/20/11) P IT No:"2071270 07/01/08 MS/PJC ORLG DRAFT CORRECTIONS 05/25/12 'KAUAI) GLV CORRECTIONS AR No: 50-029-23369-00 04/22/10 CIN/SV GLV GO(04/14/10) 12/06/16 DHS/JOA) ADPERFS(12/04/16) SEC 21,T11N,R12E,1530'FPL&1455'FE 08/30/10 JKD/PJC PERES(08/18/10) 11/28/17 MS/JMD ADPERFS(11/27/17) 12/08/10 JLJ/PJC GLV GO(12/05/10) BP Exploration(Alaska) RECEIVE • STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION JAN A/ 4 2017 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed AO G CC Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate f3 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 207-127 3. Address: P.O.Box 196612 Anchorage, Development EI Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23369-00-00 7. Property Designation(Lease Number): ADL 0047452 8. Well Name and Number: PBU W-45 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 13475 feet Plugs measured feet true vertical 8888 feet Junk measured feet Effective Depth: measured 13388 feet Packer measured 9473 feet true vertical 8900 feet Packer true vertical 8411.14 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"215.5#A-53 28-108 28-108 Surface 3600 9-5/8"40#L-80 27-3627 27-3372 5750 3090 Intermediate 9685 7"26#L-80 25-9711 25-8601 7240 5410 Production Liner 3928 4-1/2"12.6#13Cr8 9544-13472 8470-8888 8430 7500 Perforation Depth: Measured depth: See Attachment feet 04846 / r f,i True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 23-9550 23-8475 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 314 1262 1936 1610 240 Subsequent to operation: 492 1651 3066 1662 290 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations WI Exploratory ❑ Development 11 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A • Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature to / Phone +1 907 564 4424 Date 1/4/17 Form 10-404 Revised 5/2015 l/`6q/7 V T Zl �O / RBDMS Il' JAN 2 5 2017 Submit Original Only • d t0 m CO Lf) co I.[) O M ao I- (V O O A- L e- CA A- I- CO ' ) O N- CO O) A- Nm0O • 00OMOO O0MMO) 0 (0Oco00O (0OCO OOMO6O00) 0) 00 co co co 0) co co co co co O a 0 ▪ OLOU) NtoNIvvI- co (0N Q- r- r- 0CDCDAMC6 „ tnCiNI: 0 d N CO 0O - N O CO M N e- 0 0 W 0 O) O a) M O) O O) M 0) 0) 0) 0) 0) 0) 0) O 00 CO 00 O M O 00 00 ( a0 0o O 00 0 2 0 � w z w w 0 w 0 J W U m 00 w Y Y 0 W t OOO to toOOOOOO totototn -t U U w w w • 00 O co co CO O r N O to O) M I- J J J Q Q U ++ +Q N CO O A- N- O) C)) O A- N N N M CM Q Q Q UJ a s z al ' O N N N N N M M M M M M M Q Q Q OQOdwd E ~ 0 0 0 w z 0 z C1Z 2220o) v~) woo cci a < I- M L 00000000000tntoto ( O m d � t(OO - NO0) 0) 0 � - NNMM W 0 0 '- '- N N N N N N M M C") M CM C") MO C) O2 re 00 aJa `� 0 � a20c) U wow d � a- Et a0 U 0 LL LL LL LL W W D: LL ceW LL LL L_ LL LL •oaaaawwwO_ wwaaaaa w < < < < MMM < MM < QQ ¢ Q o. 0 a) 412 m a M CO o 0 0 0 0 0 0 0 0 0 0 0 0 0 • O r r r rO0e- . . . . . 0 o0o00o0000000 w z O N N N N N N N N N N N N N N N Z L < W W OO 00 ti N N ti Nt` CO to to O w w J W O N Qt N . . . . . r CL Z 0 W W W tL W Oa .- 0000 0000000000000000 m 0 0 W -J J ^.JJ CI W aoU- LL ;/ U- cnaa! 0 m z (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 (0 '""""1-1- 1- 1-1-1-1-1-1. 1" ty LL a v) 0 W IV a' • • Packers and SSV's Attachment PRUDHOE BAY UNIT W-45 SW Name Type MD TVD Depscription W-45 TBG PACKER 9472.64 8411.14 4-1/2" Baker S-3 Perm Packer W-45 PACKER 9555.4 8479.27 5" Baker ZXP Top Packer • • r.. 0 o c cum 0 , cum f0 mo oa u�i w ID o N N O M raw ore LnJ c e, O "ID OR' Q_ 4- N to -1 c ao J a as MI 0- 0 * 0 0 o N m d � E Q 7 J 5 '- CO cn C -0 O W Z- = co W - N II CO Q� fn Q a QO a) CNU O a) = ." 5a a) Q _ 3 0- u) -120 ) -1 2 (--5- c al O N .c O O I- CD "O a c cc Z o w fn * fl.Q a) 2 J II c W W N NMcn � o na) vi a�i � wF- > BELL OZ N Q O O Q � oQ � mc�owD20 M '�•w ccH Qao 1- ‘- I-- W 20 LL �� UUcnoJ -00- 0 N N HZ 0N0) Oz0U1- N '� Y SI ii-, WO EO 7 'c0 coo °' Qo H PQo2z a) ?i U QQNUHH JH .� NZ OU) O to >- QI- WNm `� E � QZ � = O mai a) wO OocLAO t, I � > QLL � d LL No Oa •Z � dQ � m 0 N c ZZ 1- A- � < OwpZ5 6 =iw O ° wO ° a W � .cmc wQ , � O � H � m� � aw � � z `�2 3Z � QY QO 3 c -0 m -1 OLoLL O EF) 21-~ Oz1- 3 0 w a m � � cam ^ v) w ft , w m O Z J m LL-0 0 >- `t EjQm2 J .jN % En_i _Im _i � WLUI5 co 20 � � � ,«- Q cW d _Jm * I a) > O _9_cn W *W ,- < < 0)) Eo oU Ow ° 0 m ix >- ws mco i a� _c NQmOX -I W' `s N 3v N J 2WU * tw O O QI ' ? OON w N O W .0 OEs-' 1--- YZ COa OO � § W QOZcO 0. I > QDQ •- Er � Q a) - _ .. rtcc _im a � cc, to iY cno mo Z - d N ~ N O c Q -- -- a Q m00 ‘1 ,9 ;,_zw } a a N rem zto m � (/) - - (a g " zC� _ 6 d' : - W 2 = Qd W � m aHaOO � (nZ o_ C U - OZ_ ceQ' QOZOT- a) O cea UUF' O m a OwNZOWU E c_ r E - c0 aw aM �' N E M * LLQ ZZ � M 0 (9U � OM = W H3EW0oOWO3 (n .,- F- WWWW >z> o - coo o ° .. cc��I � zaC� �in � QQO v � co� c`? O U) U) OD > Cr) MI- F- > z O C o V) C 0 Z < N W W' Z N O O N ZO U) U) Z Z OHF- -11- OO p73 _ Lo rnJOm0OMm ILOWO c g co ° OR NcoOO _1 _i < m co CO � YJOw '- OO = I- Zm � U a) m � W W � U WI- � WOm a m � 3 c) ow � J � d < H a� rn c Lijoozm * RE * * z ° ° _ c o - * aw = '. � w0 � w _ ( = 7ZQoow . : OO : s 0 : I- E 3 + C10 : Ce2JOU : : UY 5 : D () JJc0 W I- 0 co co co CO CO CO O O p o O co I- O O N N N N P N M N N C•1 CV N N 0 � - ,- '- ,- ,- 0 a • II 40 w . / / % k / 0 (7) 1) = .47T; ¥ o I ce m8 . 46 ■ .,-;.-1 $ a_ ƒ • t 5 2 II L « C = 1:1011 C u K / -0 / 3 U) ƒ < p - 2E \& U � 0 ƒ O � LE26 0U in 66 / G)O ' / E ƒ 3 ts1 0) O WO -0C6 < _ a (N 1-cCi52) 4- aT % " p O 02g2 = ® ® 2 0 01 muwo —C -C14- N � LI:‘- -0 co °- " � 0) / § E m 0 2 HO R o o < � � \ a5 � � 7 ƒ 7 WO • U) o, W WR % � � < O m of L E 0 � $ k ( $ � wE / \ ƒ 6 ƒ 2 w § \ m DE } k � k13 / � / / b = -' 2 � � D ' t 1- _ ? a 5 o t w - w _5 A } wk / cub kk ƒ ce � 14 ( O co \ ® � , / CNI 2 00 � ! > I0 LI Z t W < 77 � � 6c. 22c % w 0 I- / 0R o = L L 0. 2 � / � f # 0cO � 2 + � \ k - 052 @ o_ § 2 2 • CL Ox \ 2 O w W D . a) 2 w " 0 (-) - w O R - >, � 2ReeQ Om_ gga_ 00 b f2m $ m • E 2 2 f 2 E 0 < 4 Ce k ' _I 2 � % - ® o = c & o O 2 m m & O 0 e e w O L a t k 0 ® O L- '-u5 ƒ < < M 1-1-11-U ® 0 - 1- 0 k ¥ 222Wwt2O = Q-00 o@O � WCf2 � gR \c2 / EwOOoRRwE2 wSk � T:4 _1 t = o 0 2 2 w 0 0 0 O 2 2 w 0 1- 1- W002 o U O 2 � # � O D 0 0 0 0 0 0 t i < _ 0 .c £ O 067 = 0O222Q20Opse Adm & U I � _, m ct7e@ac= pE ^ cn \ = = gk Ew = ± _i = I ¥ Q2 a) -a £ E - k z o o O k k w / 2 % O « / $ s ® \ $ / 3 A E 0 $ | 0 a g q _ i | 0 at _1 a 0 2 E LI | 3 / \ o ƒ d / co \ / K / co r- = 7 n n f co in , # r d 2 TREE= _ 4-1/16"CNV 0 /,WELLHEAD= FMC SA NOTES: WELL ANGLE>70°@ 10286'*** ACTUATOR= BAKER C VV-11.5 4-1/2"TBG&LNR*** KB.ELEV= 79.7' BF.ELEV= 51.2' 1019' H9-5/8"TAM FORT COLLAR KOP= 800' Max Angle= 102°@ 12874' 2279' —�41/2"HES X NP,ID=3.813" Datum MD= 10089' L ' GAS LFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH FORT DATE 20"CONDUCTOR, — ??? 8 2510 2432 31 KBG2 DMY BK 0 04/14/10 7 3669 3409 31 KBG2 DONE BK 12 08/20111 9-5/8"CSG,40#,L-80 BTC,D=8.835" H 3629' , 6 4704 4318 30 KBG2 DMY BK 0 04/14/10 7"CSG,26#,L-80 TCI XO TO L-80 BTG5 5946 5372 29 KBG2 DONE BK 16 08/20/11M — 5027' X X 4 6686 6025 31 KBG2 DMY BK 0 12/24/07 3 7341 6598 27 KBG2 SO BK 20 08/20/11 2 8540 7628 36 KBG2 DMI' BK 0 12/24/07 Minimum ID = 3.725" @ 9538' 1 9364 8319 32 KBG2 DMY BK 0 12/24/07 4-1/2" HES XN NIPPLE I ' 9443' H 4-1/2"HES X NIP D=3.813" Z ><- 9474' H7"X 4-1/2"BKR S-3 PKR,ID=3.875' I ' 9507' --I 4-1/2"HES X NIP D=3.813" ' ' 9538' H 4-1/2"HES XN NP,D=3.725" TOP OF 4-1/2"LNR — 9646' 9545' --17"X 5"BKR ZXP LIP w!11 TIEBACK,D=4.410" 4-1/2"TBG,12.6#,13CR VAM TOP, H 9551' I / 9551' —14-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958' --I ELMD TT NOT LOG 7"CSG,26#,L-80 BTC-M — 9712' J---4 .0383 bpf,ID=6.276" 9566' H 7"X 5"BKR FLEX-LOCK HGR,ID=4.430' Y 9576' --15"X 4-1/2"XO,D=3.930' PERFORATION SUMMARY _ REF LOG: SWS VISION ON 12/17/07 ANGLE AT TOP PERF: 50'@ 10146' " Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10146-10176 0 12/04/16 2-7/8" 4 11180- 11200 0 08/18/10 , 2-7/8" 4 11590-11610 0 08/18/10 2-718" 4 12070-12085 0 12/22/07 2-7/8" 4 12070- 12085 0 08/17/10 2-7/8" 4 12170-12185 0 12/22/07 2-7/8" 4 12760-12780 0 12/22/07 '% 2-7/8" 4 12950-13010 0 12122107 2-7/8" 4 12970-12990 0 08/17/10 A`� 2-7/8" 4 13100-13120 0 12/22/07 2-7/8" 4 13170-13200 0 08/17/10 A. ` 2-7/8" 4 13235-13255 0 08/16/10 -. 2-7/8" 4 13275-13295 0 08/15/10 PBTD H 13388' 2-7/8" 4 13315-13335 0 08/15/10 2-7/8" 4 13355- 13375 0 08/15/10 4-1/2"LNR,12.6#,13CR VAM TOP,.0152 bpf,ID=3.958" --I 13473' DATE REV BY CONI TS DATE FEV BY CONVENTS PRUDHOEBAY UNIT 12/25/07 N9ES ORIGINAL COMPLETION 08/15/11 GIB/PJC GLV C/O(8/11/11) WELL: W-45 04/28/08 ?/PJC GLV CIO 08/22/11 CJNYPJC GLV PO(08/20/11) PEu1T No:"`2071270 07/01/08 MS/PJC DRLG DRAFT CORRECTIONS 05/25/12 KAUJMD GLV CORRECTIONS AR No: 50-029-23369-00 04/22/10 CJNYSV GLV C/O(04/14/10) 12/06/16 DHS/JMD ADF RFS(12/04/16) SEC 21,T11N,R12E,1530'FTl&1455'FEE 08/30/10 JKD/PJC PERFS(08/18/10) 12/08/10 JLJ/PJC GLV C/O(12105/10) BP Exploration(Alaska) rareECE1' u 2-'1'625 I DIT TI LIST BAKERPRINTS RIBU O� DECSEC 2 0 2016 HUGHES Please sign and return one copy of this transmittal form to: COMPANY Alln Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED WELL NAME W-45 900 E.Benson Blvd. 1 /3i2 01 M.K.BEND ER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. 1 COUNTY North Slope Borough LOG TYPE RPM:PNC3D-CO BHI DISTRICT Alaska --- LOG DATE December 2,2016 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares@bakerhughes.com TODAYS DATE December 19,2016 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOJ) LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #OF I'F(IN I S #OF COPIES #OF COPIES #OF COPIES 4 4 4 4 4 4 1 BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. +--. .r. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street ScAiiEO MAR 2 32097, Anchorage,AK 99510 3 ExxonMobil,Alaska 0 1 1 0 I 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 0 I 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 1 0 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 6 BP Exploration(Alaska)Inc. 0 I 0 I 0 0 I 0 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:David Itter TOTALS FOR THIS PAGE: 0 4 4 0 0 TOTALS FOR ALL PAGES: 0 4 4 0 0 • image Project. WeU History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~ ~ - ~p~~ Well History File Identifier Organizing (aone) R CAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: o r.o.,~a iuimmuiuuu DIGI AL DATA Diskettes, No. Other, No/Type: ~i~ ND NOTES: BY: Maria Date: Project Proofing BY: Maria Date: G Scanning Preparation _~~ x 30 = BY: Maria Date: ~ ~ ' ~ ~l" Production Scanning Res~a~~..a.a uiuiiiiniiimi OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: ,, rn~ iuummi~mu /s/ + =TOTAL PAGES (Count does not include cover sheet) /s/ Stage 1 Page Count from Scanned File: (Count noes include cover sheet) Page Count Matches Number in Scannin Preparation: -~,~YES NO BY: aria Date: ~ CX ' / ~t~ ~ /s/ 1/ ~/~ Stage 1 If NO in stage 1, page(s) discrepancies were foound: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. ~) I II II') (II I) I I III ReScanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III II~III III III I) P 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ^ Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Dri~Number: Name: Development Q Exploratory ^ 207-1270 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: Anchorage, AK 99519-6612 ~ 50-029-23369-00-00 8. Property Designation (Lease Number) : `~ 9. Well Name and Number: ADLO-047452 ~ PBU W-45 10. Field/Pool(s): :.. PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13475 feet Plugs (measured) None feet true vertical 8887.96 feet Junk (measured) None feet Effective Depth measured 13388 feet Packer (measured) 9474 true vertical 8899.66 feet (true vertical) 8412 Casing Length Size MD TVD Burst Collapse Structural Conductor 108 20" 215.5# A-53 SURFACE - 108 SURFACE - 108 Surface 3629 9-5/8" 40# L-80 29 - 3629 29 - 3374 5750 3090 Intermediate 9712 7"26# L-80 26 - 9712 26 - 8602 7240 5410 Production Liner 3928 4-1 /2" 12.6# 13CR80 9545 - 13473 8471 - 8888 8430 7500 Liner Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR SURFACE - 9551 SURFACE -8476 Packers and SSSV (type, measured and true vertical depth) 7"X4-1 /2" BKR S-3 PKR 9474 8412 ~~ 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~;!~~ ~ ~ ~Q~~ ~#~, :, ' , Treatment descriptions including volumes used and final pressure: d•p c~.~~ l+~` ~: ~ ~~ ~'~~>. ~1'11$SIOl1 ' _v ~nF', 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 154 418 1044 241 Subsequent to operation: 149 636 149 306 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X 16. Well Status after work: Oil ~+ ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Pre I Title Data Management Engineer Signature Phone 564-4944 Date 8/25/2010 i inn IV-YVY i~cv)ovu iiwva ~~{~~~ ~,N ~ ~ ~Y:~ ~u-/vvuv~n~.v ~ v ~~r ~ Y IVflV• A ~ //a W-45 207-127 PERF ATTOrHMFNT LJ Sw Name Perf Operation Code Operation Date Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base W-45 PER 12/22/07 12,070. 12,085. 8,970.3 8,971.75 W-45 PER 12/22/07 12,170. 12,185. 8,980.27 8,981.8 W-45 PER 12/22/07 12,760. 12,780. 9,010.51 9,006.83 W-45 PER 12/22/07 12,950. 13,010. 8,971.49 8,959.58 W-45 PER 12/22/07 13,100. 13,120. 8,943.43 8,940.07 W-45 APF 8/14/10 13,355. 13,375. 8,904.17 8,901.41 W-45 APF 8/15/10 13,275. 13,295. 8,915.59 8,912.6 W-45 APF 8/15/10 13,315. 13,335. 8,909.73 8,906.96 W-45 APF 8/16/10 13,235. 13,255. 8,921.65 8,918.62 W-45 APF 8/17/10 12,070. 12,085. 8,970.3 8,971.75 W-45 APF 8/17/10 12,970. 12,990. 8,967.4 8,963.41 W-45 APF 8/17/10 13,170. 13,200. 8,931.74 8,927. W-45 APF 8/18/10 11,180. 11,200. 8,961.59 8,960.95 W-45 APF 8/18/10 11,590. 11,610. 8,941.97 8,941.18 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ! • W-45 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 8/13/2010 ~ CTU #5 w/ 1.75" ~ Drift/PPROF/SCMT/Pert RIH w/ 2.7" nozzle to tag of PBD at 13404' CTM. Run SLB memory log 3 gr/ccl/temp/press/spinner/deft to 13250'. SI well. RIH w/ SCMT 8/1 4/201 0 3 CTU #5 w/ 1.75" CT I PPROF/SCMT/Pert RIH w/ SCMT to 13296' flag and log up to 9900' twice. POH. Pertorate 13355- 13375' w/ gun #1 2-7/8" Powerjet HMX, 4 spf. a ~__ _ 8/1 5/201 0 3CTU #5 w/ 1.75" CT PPROF/SCMT/Pert 'Cut 150' of CT for chrome management. Log MGR/CCL from PBD to 12900'. RIH and perforate 13315-13335' and 13275-13295' in two runs 2-7/8" Powerjet ;HMX, 4 spf 8/16/2010,CTU #5 w/ 1.75" CT PPROF/SCMT/Pert ;RIH gun #4 and perforate 13235-13255'. Cut CT for chrome management. !Change out pack-offs. Pertorm chain inspection. Run SLB memory gr/cc from 11800-13300'. RIH w/ perf gun #5 8/17/2010' CTU #5 w/ 1.75" CT PPROF/SCMT/Pert ;Finish RIH and perforate 13170-13200' w/ gun #5 2-7/8" Powerjet HMX, 4 spf RIH and Pertorate 12970-12990' w/ gun #6 2-7/8" Powerjet HMX, 4 spf j RIH and Pertorate 12070-12085' w/ gun #7 2-7/8" Powerjet HMX, 4 spf i Cut 150' of CT for chrome management RIH w/ MGR/CCL 8/18/2010 ~ CTU #5 w/ 1.75" CT PPROF/SCMT/Add Perf Log MGR/CCL from 10950-11650' Pert 11,590-11,610', and 11180' - 11200 with 2-7/8" Powerjet HMX, 4 spf Weekly BOP Test 8/19/2010; CTU #5 w/ 1.75" CT: Job Scope: SCMT/PPROF/Pertorate: Continued from 18 Aug 10. Rig down and move off. '`**Job Complete*** FLUIDS PUMPED BBLS 290 2% KCI W/0.6% SL 93 50/50 METH 383 Total TREE= 4-1/16" CMJ WELLHEAD = FMC ACT~JATOli2 = • BAKER C KB.ELEV = 79.T BF. ELEV = 51.2' KOP = 800' Max Angle = 102° @ 12874' Datum MD = 10089'1 Datum TV D = 8800' SS'. 20" CONDUCTOR, 9-5/8" CSG, 40#, L-80 BTC, ID = 8.835" 7" GSG, 26#, L-80 TCII XO TO L-80 BTGM Minimum ID = 3.725" @ 9538' 4-112" HES XN NIPPLE LTOPOF4-1/2" LNR-L 9545' 4-112" TBG, 12.6#, 13CR VAM TO~ 9551' .0152 bpf, ID = 3.958" 7" CSG, 26#, L-80 BTGM (-j 9712, .0383 bpf, ID = 6.276" SAFETY S: WELLANGI_E> 70° @ 10286' *** W -4 5 4-1 /2" TBG &LNR *** 1019' - 9-5/8" TAM PORT COLLAR 2279' 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS PERFORATION SUMMARY REF LOG: SWS VISION ON 12/17/07 ANGLE AT TOP PERF: 84° @ 12070' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 12070 - 12085 O 12/22/07 2-7/8" 4 12170 - 12185 0 12!22/07 2-7/8" 4 12760 - 12780 O 12/22/07 2-7/8" 4 12950 - 13010 O 12/22/07 2-7/8" 4 13100 - 13120 O 12/22/07 ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2510 2432 31 KBG2 DMY BK 0 04/14/10 7 3669 3409 31 KBG2 DOME BK 12 04/14/10 6 4704 4318 30 KBG2 DMY BK 0 04/14/10 5 5946 5372 29 KBG2 DOME BK 16 04(14/10 4 6686 6025 31 KBG2 DMY BK 0 12/04/07 3 7341 6598 27 KBG2 SO BK 20 04/14110 2 8540 7628 36 KBG2 DMY BK 0 12/04/07 1 9364 8319 32 KBG2 DMY BK 0 12/04/07 Jg43' ~-j4-1/2" HES X NIP, ID = 3.813" I 9474' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 9507' 4-1/2" HES X NIP, ID = 3.813" 91 538' I-j 4-112" HES XN NIP, ID = 3.725" I 9545' 7" X 5" BKR ZXP LTP w ! 11 TIEBACK, ID = 4.410" 9551' 4-1/2" WLEG, ID = 3.958" ~~ ELMD TT NOT LOG 9566' 7" X 5" BKR FLEX-LOCK HGR , ID = 4.430" 9576' 5" X 4-1 /2" XO, ID = 3.930" PBTD -t 4-1/2" LNR, 12.6#, 13CR VAM TOP, .0152 bpf, ID = 3.958" 133 8' Y 13473' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/25/07 N9E5 ORIGINAL COMPLETION 04128/08 ?iPJC GLV GO 07/01!08 MS/PJC DRLG DRAFT CORRECTIONS 04/22/10 CJWSV GLV GO {04/14/10) PRUDHOE BAY UNff WELL: W-45 PERMff No: 2071270 API No: 50-029-23369-00 SEC 21, T11N, R12E, 1530' FNL & 1455' FEL BP Exploration (Alaska} '~°3. ~ ~~~ ~"~~ ~~ ~ 5 }; S. .~a'x A Y ...~' .~, jT'""~. yY ~. r i ~ ~ ~ ' # `~ ; ~ ~`~~ ..~~~~.. .MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc OS/05/09 ~~a~~~~~~~~~~ ~laska Da4a & Consulting Services ~525 Gambell S4reet, Suite 400 R~nehorage, Af( 99503-2838 1~~n~: ~e4h ~A/et6 Job # . NO. 5329 ,~ ~ P tx~i:~.~~- i' j ~{~ ~, ~;' f._ t1 ~+'' ~j Company: State of Alaska Alaska Oil & Gas f~ons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 951501 Log Description Date BL Color CD _~~R P 21 S AWJI-00039 MEM PROD PROFILE - 07l14/09 1 1 _ P2-1~ AXWS-00013 PRODUCTION PROFILE - 07/12/09 1 1 C-36A AY1M-00017 IBP SET RECORD W/CROSSFLOW G L 07/08/09 1 1 _ VN-45 AXBD-00035 MEM TEMP & PRESS SURVEY .~ c 07/09/09 1 1 ~ F9-13A ~ B2NJ-00009 MCNL _. L L/ C O6/17l09 1 1 F-08A ~ AY1M-00028 RST - L 07/01/09 1 1 ~~_ 01-19 AV3J-00038 CH ED T P C TBG PUNCH/JEWELRY LOG 07/10l09 1 _._~_._ ~ -- D ~ 11 IDI CACC A!`IlNIA\X/I Cf1I+C rlC f~~~nT n _ _ . . _ _ __ _ _ " --- "_ "_~.~.. . .~ . ~.~......~. r...~ ..r. v~ ~~~~~~v v~~a. vvr ~ L.f1v~ I v. BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petro4echnical Data Center LR2-1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503-2838 ~ i DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071270 Well Name/No. PRUDHOE BAY UNIT W-45 MD 13475 TVD 8888 Completion Date 12/25/2007 REQUIRED INFORMATION Mud Log No Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23369-00-00 Completion Status 1-OIL Current Status 1-OIL UIC N Samples No Directional DATA INFORMATION Types Electric or Other Logs Run; Surface Gyro, MWD, Dir / GR, RES / PWD, NEU /DEN, USIT Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No D Asc Directional Survey pt Asc Directional Survey ~D C Lis 15956~nduction/Resistivity ~g Induction/Resistivity 2 Blu ~og Induction/Resistivity 25 Blu 't/E (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments 0 13475 Open 12/28/2007 0 13475 Open 12/28/2007 100 13474 Open 2/28/2007 LIS Veri, GR, ROP, FET, RPS, RPM, RPD, DRHO, NPHI w/PDS graphics 108 13439 Open 2/28/2008 MD Vision Service 18-Dec- 2007 108 13439 Open 2/28/2008 TVD Vision Service 18- Dec-2007 D~C Asc Directional Survey 0 1383 Open 1/22/2008 ;tFrpt Directionai Survey 0 1383 Open 1/22/2008 ~g Temperature 25 Blu 9502 10378 Case 5/9/2008 Mem Temp, Pres Survey CCL, GR 28-Apr-2008 C Pds 16241~emperature 9502 10378 Case 5/9/2008 Mem Temp, Pres Survey CCL, GR 28-Apr-2008 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comme nts ADDITIONAL INFORMATION Well Cored? Y>~f Daily History Received? Chips Received? '4`t~l'^ Formation Tops Analysis ~1-Pd' Received? U DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071270 Well Name/No. PRUDHOE BAY UNIT W-45 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23369-00-00 MD 13475 TVD 8888 Completion Date 12/25/2007 Completion Status 1-OIL Current Status 1-OIL UIC N Comments: Compliance Reviewed By: Date: 05/08/08 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wcll t..~. u NO. 4690 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Pi-18A 12014006 PRODUCTION PROFILE 04/05/08 1 vvw~ Vv i GNI-04 12057606 RST/VVFL -}. _ I / 04/24/08 1 1 MPL-15 12021153 MEM INJECTION PROFILE ~~ Zc-~a~--®~ `d L (/~ 04/19/08 1 1 03-09 11999005 _ -- . PRODUCTION PROFILE W/FSI ~ 04/29/08 1 1 6-22A 11970825 USIT ~ ~~ 04/27/08 1 1 W-45 11978456 MEM TEMP & PRESS SURVEY p-}_ I G` e~~'(( 04/28/08 1 1 X-06 12071852 INJECTION PROFILE ~ t 04/30!08 1 1 L5-32 11975767 PRODUCTION PROFILE W/FSI ' `6~- 04/27/08 1 1 of cne~ nr•~r~~rnnn C~l/~G ~G /+CIf1T A\/ Plf~• BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 .....-.......~..........., v~.~ vvr ~ ch~.n ~ v: Alaska Data & Consulting S rvices 2525 Gambell Street, Sui 4 / Anchorage, AK 99503-2 8 r/// ATTN: Beth Received by: Date Delivered: ~''~ ~~'~1 t ~~ ~ i), ~.~~~~ $ 02~2~108 $C~iI11b~1'I~I' N0.4599 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil 8~ Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Polaris,Lisburne Wcll Jnh zt ~ ..., new.. ...:.... n.-a.- W-216 40016312 OH MWD/LWD EDIT - 2 f- 01/07/08 2 1 LGI-04 11970706 RST ~j/ _ 4- 12!31107 1 1 W-45 40016146 OH MWD/LWD EDIT ~- "~ 12/18107 2 1 15-046 12005202 CH EDIT PDC GR (SCMT) ~- ~ 12/28/07 1 C-16B 11209604 MCNL c70(o-OS- ~ IS ~ 05/19!06 1 1 B-18 11962779 RST '¢ 01/05/08 1 1 rr.-..+r .. v,~.~v~rr~vv~ ,~~v~,r , ~+, V.V,~~.~V rlnv I~G1 aJ(~nlnv vnc vvr ~ G/11i f1 1v. BP Exploration (Alaska) lnc. Petrotechnical Data Center LR2-1 _. 900 E. Benson Blvd. r _~` +'_ Anchorage, Alaska 99508 ~`'~' ~~ Date Delivered: ~ ;. ~ ~~ ~~ £~ t('ir~t~~; Alaska Data & Consulting Services 2525 Gambell Street, Suite 4 ~ Anchorage, AK 99503-28 8 J ATTN: Beth ~q ` W Received by: .~. STATE OF ALASKA ~~ R~~~~ ALASKA~L AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG JAN Z 2 2008 Alaska Gil & Gas Cons. CortlmisSiaQ 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 2oAAC2s_~os 2oAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. WeA Class: AI1ChQC2~B ®Development lL,.JJ xploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aba .. ~ 12125/2007/ 12. Permit to Drill Number 207-127 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 11/24/2007 ~ 13. API Number 50-029-23369-00-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 12/17/2007/ 14. Well Name and Number: H-~5 _ FSL, 1455 FEL, SEC. 21, T11N, R12E, UM 3750 Top of Productive Horizon: 535' FNL, 678' FEL, SEC. 28, T11 N, R12E, UM 8. KB (ft above MSL): 79.7' Ground (ft MSL): 51.2 15. Field /Pool(s): _ Prudhoe Bay Field / Prudhoe Bay Total Depth: 1887' FNL, 2240' FWL, SEC. 27, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD) 13388' ~ 8900' ~' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 611790 y- 5958723 Zone- ASP4 10. Total Depth (MD+TVD) 13475' - 8888'' ~ 16. Property Designation: ADL 047452 ' TPI: x- 612640 y- 5954450 Zone- ASP4 Total Depth: x- 615581 y- 5953143 Zone- ASP4 11. SSSV Depth (MD+TVD) N!A 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electr nic and rinted inf rmati n er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): Surface Gyro, MWD, Dir / GR, RES / PWD, NEU /DEN, USIT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH.TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 215.5# A-53 urface 10 ' Surface 108' 42" 2 0 sx Ar tic Se A rox. 9-5/8" 40# L-80 29' 3629' 29' 3374' 12-1/4" 665 sx Dee Crete 433 sx Class'G' 7" 26# L-80 26' 5027' 26' 4592' 8-3/4" See Below 7" 26# L-80 5027' 9712' 4592' 86 2' 8-3/4" 85 x LiteCret sx Class'G' 4-1 /2" 12.6# 13Cr80 9545' 13473' 8471' 8888' 6-1 /8" 365 sx CI ss 'G' 23. Open to production or inject ion? ®Yes ^ No 24. Tue1NG RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 2-7/8" Gun Diameter, 4 SPF 4-1/2", 12.6#, 13Cr80 9551' 9474' MD TVD MD TVD 12070' - 12085' 8970' - 8972' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12170' - 12185' $9811' - 89$2' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 12760' -12780' 9011' - 9007' 12950' - 13010' 8971' - 8960' 2472' Freeze Protected with 84 Bbbls of Diesel 13100' - 13120' 8943' - 8949'-~~ 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per ~ ~ 71. ,°~rL~.fa'0!'~ Y ~q~' None ~~~' "`~~4:~ ~' ~~ `# s ~~()Q ,,elS~j ~~ i~3~ ,,._ Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Tested . ^ Yes ®No Permafrost Top 28.5' 28.5' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1946' 1925' detailed test information per 20 AAC 25.071. Ugnu 3689' 3425' Ugnu M 5005' 4574' None Schrader Bluff'N' 5306' 4825' Schrader Bluff'O' 5505' 4993' Schrader Bluff /Top Colville 5901' 5333' Top HRZ 7515' 6756' Top Miluveach 7737' 6956' Top Kingak 8305' 7440' Top Sag River 9718' 8607' Top Shublik 9752' 8633' Top Eileen 9882' 8731' Ivishak Zone 4 9912' 8753' Ivishak Zone 3 10222' 8961' Ivishak Zone 3 10712' 8978' Ivishak Zone 3 11334' 8958' Ivishak Zone 3 12316' 8996' Ivishak Zone 3 13014' 8959' Formation at Total Depth (Name): Ivishak Zone 4 13475 8888' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and Leak-Off Test Summary. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondra Ste an Title Drilling Technologist Date ' ~, (' (~ W-45 207-127 Prepared By NameMumber. Sondra Stewman, 564-4750 Well Number Permit N . / A royal No. Drilling Engineer: Mark Staudinger, 564-4337 INSTRUCTIONS GeNew-I.: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 welt completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). Ire~r 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only TREE= ~1-if16" c;P,.,J 4NE1 LriFJa E1= ~FEI~__~ '~GTLigTC~R = _ ~ Ffy~rauli~ mA.... ._.. hB FLEV = 8 ~, BF.LEV= _ 512 ___m® KOP = -~ 306' __ -- hh~y Angb: ` _-_ 99 r"114.i~1' ~Oaturr~ Md - 10009' Llah~n:,TUD= _. ,_ 3800' SS t - 9 ~ 3" CSC,, 4Q#" 1.-36, VD= 8.835" 3fi 29' - I 7" CSC, 26#, L-80, TG11, .1Q383 bpf, Id ~ 6.7_76"' ~~~y Minimum I[} = x.725" 9538' 4-112"' X1V NIPPLE SR NbT'~S: ""`4-1I2" CHROM E TSG & Ltd""' -45 '01$' ~9 518" TA h' Fort ColCar 2279' 4-1'x° I'cS X rt'ppfsle , !b= 3,513•' C;F; ,; I IFT N1A NDREt~S S T 1140... T1/ D DEV TYPE _ V L~l LATCN ~x?i~ F DATE 8 2514 2432 31 KBG 2 ItRAIr SB1{=2 (3 1 ^<24i~:? 7 3ei?Q .1409 31 KBG-? S~}(-2 b 1 _''2~7'D7. 6 4704 4318 3Q KBG-2 I~CvI`( 8Bi(-2 0 1 ~ ~<UC;~ 5 594h 5:i?2 29 KBG 2 C?CR 13EK-2 D 1 ' ~ 4 ~:?'' 4 668~~ 6025 31 t{:BG-? 1:itvTY SE3IC_2 (} 12;x-110? 3 73=:1 6598 27 KBG-2 [?tail' SBK 2^ 0 12'21;;;%E 2 8`40 76'.?8 36 KBG.-2 0h1Y S6K- ~` 0 12724, 1' ~ 9~~4 X319 ~2 Ku~.;.ry c~rv>1Y SBK-2c b 1^ ~4,'a~ 9443' H4-1f2", X t'~ippte {3.813" IUD, 9474' F-~{Gaker S-3 F~aeker, 7".x 4.5'. ~5p7' 4-112 X nipple (3.813" 1~} ~1-112" T6G, 126#, '13-Gr, ~/arn~Tt~p, 1L~ 3.958" 4.5'" WLEG, Itk 3.958" (7" GSG, 26#, L 80, BTC "Jl, .0383 ktpf, 1D = 6.276"` s~~~..,~.....F 9551" PJwRFgRATKJN ~Uh+Ih1AKY REF LOG: SINS 1/ISK7h1 Lcg 12717107 ANGI_EATTOPPFRF 84° ~ 1207(}` Note: Refsr tv PYoductPon DB for historical perf data Sr<E SPF INZ~F2VAl. Opt~ISgz C?AATE 2.8%5"' 4 1207©- 1?085 t) 1 J?2iU? 2.375"' 4 '121 'D - 12185 Q i 2122107 ?.87~"' A i 2 f EaQ - 12780 t} 12/22,07 ~? X75"• 4 129511- 1301 {l ~7 121221©7 ~ 0'S" ~ 1 3100 - 13120 {) 12/,22107 X538" ~ 41/2° XN rJlpple (3 7^5" tq) ~~~~, 5" x 7" Liner top Packerw7 Tieback Sleeve F!ST[) {-~ 13388' 4.172" LNR, 1~-Cr" 12."~, VT ~-j 13473' GAIL R~! BY GOMINENTS L}ATt P.F1~' BY CC~t~tv1ETJIS 12125(Q8 N9ES ORIGINAL COMPLETIQN O1JQ1148 (TLH CCtRRtCTIOFJS I~~t~~ta~ eA~r ~fNrr WELL: W-45 F'EFCf t+ta: #20 i 12/'0 3761" PSL, 1454' FELL Scc t1 ; T1 1 P,1: R ~ "' ; LEI BP Exploration (Alaska} i ~ BP EXPLORATION Page 1 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALAS KA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task. ~ Code NPT Ph ase ', Description of Operations 11/22/2007 06:00 - 07:00 1.00 MOB P PRE Hook onto mud pits and move around pad on other side of W -45. 07:00 - 08:00 1.00 MOB P PRE Move sub base off of W-214i for access to surface diverter stack. 08:00 - 09:00 1.00 MOB P PRE Remove herculite and matting boards from W-2141. 09:00 - 10:00 1.00 MOB P PRE Move sub base around pad near W-45. (Derrick up move) 10:00 - 14:00 4.00 DIVRTR P PRE Nipple up diverter system on W-45. 'Note: Rig acceptance time to be rolled back 4 hours from diverter work. 14:00 - 17:00 3.00 MOB P PRE Lay matting boards around cellar. Spot sub base over W-45. 17:00 - 18:30 1.50 MOB P PRE Lay matting boards for mud pits. Spot mud pits. 18:30 - 20:00 1.50 RIGU P PRE Hook up lines at interconnect. Secure all steps and railings. Rig up flowline. Berm around pits and flowline area. 20:00 - 00:00 ~ 4.00 ~ DIVRTR ~ P 11/23/2007 100:00 - 05:00 I 5.001 DIVRTR I P 05:00 - 11:00 6.00 DRILL P 11:00 - 16:30 5.50 RIGU P 16:30 - 17:00 0.50 RIGU P 17:00 - 20:30 3.50 RIGU P 20:30 - 21:00 0.50 DIVRTR P 21:00 - 00:00 11/24/2007 00:00-01:00 01:00 - 02:00 02:00 - 03:00 03:00 - 03:30 03:30 - 04:30 04:30 - 05:30 05:30 - 07:30 07:30 - 10:30 3.001 RIGU I P 1.00 RIGU P 1.00 RIGU P 1.00 RIGU P 0.50 RIGU P 1.00 RIGU P 1.00 RIGU P 2.00 RIGU P 3.00 RIGU P 10:30 - 12:00 1.501 DRILL ~ P 'Accept rig for W-45 operations @ 16:00 hr, 11/22/2007. PRE Take on water for spud mud. Prep cellar for diverter work. Berm around rig. Fill in air holes around rig (Phase 1 conditions with sustained winds of 30 mph and gusts to 45 mph). Prep pipeshed for loading drill pipe. Dig out drill pipe from drifted snow. PRE Nipple up diverter system, start mixing spud mud. `All operations slowed down due to Phase 1, then Phase 2 conditions through out the day. PRE Load drill pipe into pipeshed, continue mixing spud mud PRE Pick up drill pipe 1 x 1, building and racking back stands. PRE Hold Pre Spud and safety meeting with BP WSL B. Neufeld, NAD TP M. Ashley and B. Hohn's crew. PRE Continue picking up drill pipe and standing back in derrick. PRE Perform Diverter function test and acc m I t Witnessing of test waived by AOGCC rep John Crisp. Test witnessed by BP WSL R. French and NAD TP G. Hoffman. PRE Bring BHA tools to rig floor. Locate and dig out HWDP, bit and NB reamer. (Equipment under 15 ft of snow drifts.) Load HWDP in shed. Held Pre Spud with Dolfi's crew during Pre Tour. PRE Pick up HWDP 1x1 and stand back in derrick. PRE Rig up Gyro Data and Halliburton E-line. PRE Make up used 12 1/4" bit and NB Stab on bottom of stand of HWDP to drill ice plug in conductor. PRE Fill all lines and conductor. Check for leaks - OK. Pressure test surface circulating equipment to 3,000 psi - OK. PRE Drill out ice in conductor all the way to bottom @ 108'. 440 gpm, 185 psi, 85 rpm, .3k TO off, 1 k TO on. PRE POH and laydown bit and NB Stab. Stand back HWDP. PRE PJSM. Pick up drill collar stand jar stand and stand back in derrick. PRE Pick up BHA #1: New HTC 12 1/4" MXL-1X bit, PDM w/ 1.5 deg ABH, NM lead collar, NM Stab, MWD, NM Stab, NM XO, UBHO sub, NM DC, NM Stab, tea NM DCs, saver sub. SURF Spud in 12 1/4" surface hole @ 10:30 hr, 11/24/2007. Gyro ~ Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Operations Summary Report Page 2 of 21 Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To ,Hours Task II Code NPT Phase Description of Operations -_ - 11/24/2007 10:30 - 12:00 1.50 DRILL ~ P SURF every 100'. 12:00 - 13:30 1.50 DRILL P 13:30 - 14:00 0.50 DRILL P 14:00 - 15:30 1.50 DRILL P 15:30 - 21:00 5.50 DRILL P 21:00 - 23:00 2.00 DRILL N 23:00 - 00:00 1.00 DRILL P 11/25/2007 100:00 - 03:00 3.001 DRILL P 03:00 - 03:45 03:45 - 04:45 0.75 DRILL P 1.00 DRILL P 04:45 - 06:30 1.751 DRILL P 06:30 - 07:30 1.00 DRILL P 07:30 - 12:00 4.50 DRILL P 450 gpm, 970 psi, 50 rpm, 1 k TQ on, .5k TQ off. PU - 54k, SO - 52k, RWT - 53k, WOB - 5-20k. AST - 0.00 hrs, ART - 1.26 hrs. SURF Continue drilling surface hole from 230' to 360'. 600 gpm, 1200 psi off, 1,280 psi on. 80 rpm, .8k TO off, 1.1 k TO on. SURF Circulate hole clean. 617 gpm, 1,220 psi, 10 rpm, .3k TO. SURF POH to pick up jar stand from 360' to 175'. Make up jar stand and run in hole. Wash to bottom. Had 5' of fill. SURF Continue drilling surface hole from 360'to 1,099'. Gyro surveys every 100'. 600 gpm, 1,720 psi off, 1,900 psi on. 80 rpm, 2.5k TO off, 4k TO on. PU - 78k, SO - 74k, RWT - 76k, WOB 20k. RREP SURF Pop off valve on #2 pump failed. Replace valve. Circulate @ 268 gpm, 550 psi while replacing valve. SURF Directionally drill from 1,099' to 1,193'. Gyro surreys every 100'. 600 gpm, 1,890 psi off, 1,980 psi on. 80 rpm, 2.5k TO off, 4k TO on. PU - 78k, SO - 74k, RWT - 76k, WOB 20k. AST 1.16 hrs, ART - 1.63 hrs. "No gravel, mostly clay coming_ over shakers after 1st 300 ft. No fill on connections, No drag. No mud losses. Maintained 400+ viscosity through out the day. SURF Continue directionally drilling 12 1/4" surface hole from 1,193' to 1,480'. Gyro surveys every 100'. 700 gpm, 2,550 psi off, 2,780 psi on. 80 rpm, 1.7k TO off, 5.2k TO on. PU - 80k, SO - 65k, RWT - 78k, WOB 35k. SURF Circulate 15 minutes. Take last Gyro survey. Rig down sheaves out of derrick. SURF Circulate 3 bottoms up @ 700 gpm, 2,500 psi ICP, 2,200 psi FC P. 1st bottoms up -heavy amount of clay. 2nd bottoms up -half as much clay. 3rd bottoms up -shakers clean. 'Note ve little wood over shakers throu h out surface hole. SURF Short trip for hole evaluation. POH from 1,480' to Jars @ 230'. Trip was good. Pumped out from 540' to 510' @ 300 gpm, 400 psi. (30k overpull @ 540') SURF Run in hole from 230'to 1,389'. Wash last stand down last stand. 25 ft of light fill. SURF Continue directionally drilling 12 1/4" surface hole from 1,480' to 2,188'. 630 gpm, 2,140 psi off, 2,400 psi on. 80 rpm, 3.4k TO off, 6.3k TO on. PU - 83k, SO - 65k, RWT - 75k, WOB 35k. AST - 3.28 hrs, ART - 1.55 hrs. Printed: 1/14/2008 8:57:30 AM ~ ~ BP EXPLORATION Page 3 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date II From - To Hours ~ Task ~ Code NPT i Phase ~' Description of Operations - ` __ - - 11/25/2007 12:00 - 19:30 7.50 DRILL ~ P ~ ~ SURF ~_Continue directionally drilling 12 1/4" surface hole from 2,18 19:30 - 21:00 ~ 1.50 ~ DRILL I P ~ SURF 21:00 - 22:00 1.001 DRILL I P I SURF 22:00 - 23:30 1.501 DRILL P SURF 23:30 - 00:00 I 0.501 DRILL I P I I SURF 11/26/2007 00:00 - 00:30 0.50 DRILL P SURF 00:30 - 01:00 0.50 DRILL P SURF 01:00 - 02:30 1.50 DRILL P SURF 02:30 - 04:30 2.00 DRILL P SURF 04:30 - 06:00 1.50 DRILL P SURF 06:00 - 06:30 0.50 DRILL P SURF 06:30 - 09:00 I 2.501 DRILL I P I I SURF 09:00 - 11:30 2.50 DRILL P SURF 11:30 - 15:00 3.50 DRILL P SURF 15:00 - 15:30 0.50 DRILL P SURF 15:30 - 18:30 3.00 CASE P SURF 18:30 - 00:00 5.50 CASE P SURF to TD ~ 3,640 MD, 3,383' TVD. 640 gpm, 3,060 psi off, 3,275 psi on. 80 rpm, 4k TQ off, 6.5k TQ on. PU - 120k, SO - 95k, RWT - 100k, WOB 35-40k. AST - 0.47 hrs, ART - 4.38 hrs. Circulate bottoms up C~ 640 gpm, 3,040 psi. Stand back 1 stand. Circulate 2 more bottoms up C~ 680 gpm, 3,135 psi, 100 rpm, 4k TQ. 1st bottoms up -heavy amount of clay. 2nd bottoms up -half as much clay. 3rd bottoms up -shakers clean. Monitor well - OK. MW - 9.5 ppg. Start short trip to jars. Pulled 5 stands to 3,165' with improper pipe displacement. Run in hole to bottom. No fill. Circulate 2 bottoms up C~3 653 gpm, 3,195 psi, 50 rpm, 3.7k TQ. Shakers clean. Monitor well - OK. 9.5 ppg MW. Start short trip to jars. PU - 125k, SO - 95k. POH from 3,640' to 3,099' without problem and with correct pipe displacement. `No mud losses for the day and well. Continue POH for short trip to jar. Hole started swabbing Q 2,811'. Pump out of hole from 2,811' to 2,640' C~ 2 bpm, 325 psi. Started pulling tight with a slight pack-off. Backream from 2,640' to 1,840'. 578 gpm, 2,040 psi, 60 rpm, 3.5k TQ. POH dry from 1,840' to Jars C~ 265' without problem. Run in hole from 265' to 2,900' without problem. Attempt to work through tight spot C~? 2,900. Ream from 2,900' to 3,285'. 280 gpm, 985 psi, 60 rpm, 5-14k TQ. Run in hole without pumping from 3,285' to 3,585'. Wash to bottom - No fill. Circulate bottoms up ~ 600 gpm, 2,680 psi, 100 rpm, 5k TQ. Increase pump rate and circulate 3 X bottoms up C~ 712 gpm, 3,415 psi ICP, 3,300 psi FCP. PU - 117k SO - 92k, RWT - 105k. 100 rpm, 4.3k TQ. Monitor well - OK. MW - 9.5 ppg. POH to run 9 5/8" surface casing from 3,640' to 265' without problem. Stand back jar stand and DC stand. Laydown BHA #1. Bit grade: 1-1-WT-A-E-I-NO-TD Clear and clean rig floor. PJSM. Make dummy hanger run. Rig up to run 9 5/8" surface casing. PJSM. Pick up and Bakerlok 9 5/8" shoe track. Check floats - OK. Run in hole with 9 5/8" 40# L-80 BTC casing to 2,158' without problem. Make up torque average - 9,600 ft/bls. Used BOL pipe dope. Filled every joint with Franks fill-up tool. Lost 2/3 of pipe displacement to 2,158'. Running speeds regulated by pipe displacement. Printed: 1/14/2008 8:57:30 AM ~ ~ BP EXPLORATION Page 4 of 21 ~ Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/26/2007 18:30 - 00:00 5.50 CASE P SURF "Lost 20 bbls of spud mud on casing trip in. 11/27/2007 00:00 - 04:00 4.00 CASE P SURF '20 bbls total mud lost for well. Continue runnin in hole with 9 5/8" surface casin from 1 to 3 537' without roblem. Pipe displacement improved. Lost 3 bbls from midnight to last joint in. Lost total of 23 bbls for casing run. Ran total of 87 jts with TAM Port Collar placed at 1 019'. 04:00 - 04:30 0.50 CASE P SURF Make up hanger and landing joint. Rig down 350 ton casing slips. Land casing on depth ~ 3,629'. PU - 190k, SO - 93k. 04:30 - 05:00 0.50 CASE P SURF Rig down Franks tool. Make up cementing head and circulating lines. 05:00 - 08:30 3.50 CEMT P SURF Break circulation and stage up pumps from 2 bpm to 6.5 bpm, 490 psi for 1st bottoms up. Increase rate to 8 bpm for remainder of circulation, 830 psi ICP, 495 psi FCP. ,Circulated a total of 6 bottoms up. Reciprocate casing in 13ft strokes. PU MW - 9.5 ppg, Vis 78, YP - 18 Held cementing PJSM while circulating. No mud losses. 08:30 - 12:15 3.75 CEMT P SURF Switch over to Dowell. Pump 5 bbls of fresh water. Pressure test lines to 4,000 psi - OK. Mix on the fly and pump 91.5 bbls of 10 ppg MudPush II spacer ~ 6.3 bpm avg, 180 psi ICP, 165 psi FCP. Drop bottom plug. Reci rocate casing in 12 ft strokes. Mixon the fly and pump 455 bbls of 10.7 ppg CemCrete lead cement C~3 5.6 bpm avg, 145 psi ICP, 405 psi FCP. Good lift pressure with lead around shoe. Reciprocate casing in 10 ft strokes Mixon the fly and pump 89.4 bbls of 15.8 ppg Class "G" tail cement @ 3.5 bpm avg, 330 psi ICP, 645 psi FCP. Reci rocate casin in 10 ft strokes. Drop top plug C~ 11:07 hr and kick out with 10 bbls of fresh water. Switch to rig. Stop reciprocating and land casing due to sticky _ up weight. Displace cement with total of 259 bbls of 9.5 ppg mud. Good lift pressures with tail around shoe. 1st 247 bbls C~3 5 bpm, 250 psi ICP, 1,020 psi FCP. Last 12 bbls C~ 2 bpm, 860 psi. Bumped plug to 3,500 psi on schedule with 96.3% pump CIP ~ 12:12 hr. 'Returned 175 bbls of "sidewalk cement" to surface = 161 washout factor. 12:15 - 13:00 0.75 CEMT P SURF Hold ressure on casing for 30 minute casing test. Good Test!. Bleed off pressure, check loats - K. 13:00 - 15:00 2.00 CEMT P SURF Rig down casing head, laydown landing joint. Rig down cement and casing equipment. 15:00 - 18:00 3.00 DIVRTR P SURF Nipple down surface diverter system. 18:00 - 22:00 4.00 WHSUR P SURF Bring casing and tubing heads into cellar. Nipple up casing head. Test metal to metal seal to 1,000 psi - OK. Wait on pad operator for tubing head orientation -1 hour. (Orienting marks Printed: 1/14/2008 8:57:30 AM • ~ BP EXPLORATION Page 5 of 21 Operations Summary Report Legal Well Name: W-45 Common W ell Name: W-45 Spud Date: 11/24/2007 Event Nam e: DRILL+C OMPLE TE Start : 11/22/2007 End: 12/25/2007 Contractor Name: NABOB S ALAS KA DRI LLING I Rig Release: 12/25/2007 Rig Name: NABOB S 9ES Rig Number: Date ' From - To 'Hours Task ~ Code. ; NPT Phase Description of Operations 11/27/2007 18:00 - 22:00 4.00 WHSUR P SURF were missing due to pre rig conductor work with butt-weld connection addition. Nipple up tubing head. 22:00 - 00:00 2.00 BOPSU P SURF Nipple up ROPE. 'Lost 3 bbls of spud mud for the day. 'Lost total of 23 bbls of spud mud for the well. 11/28/2007 00:00 - 08:00 8.00 BOPSU P SURF Continue nippling up BOPS. 08:00 - 08:30 0.50 BOPSU P SURF Rig up to test BOPE. 08:30 - 16:00 7.50 BOPSU P SURF Pressure test BOPE to 250 psi low, 3,500 psi high. Perform accumulator drawdown test. Witnessing of test waived by AOGCC rep Jeff Jones. Test witnessed by BP WSL B. Neufeld and NAD TP M. Ashley. 16:00 - 16:30 0.50 BOPSU P SURF Rig down test equipment and blowdown lines. Install wear bushing. 16:30 - 21:30 5.00 DRILL P INTi Pick up 87 drill pipe singles and rack back in derrick. 21:30 - 00:00 2.50 DRILL P INT1 PJSM. Pick up BHA #2: New Hycalog 8 3/4" DTX619S-A2 bit, PDM with 1.15 deg ABH, NM Stab, ARC, MWD, NM DC, NM Stab, tea NM DCs, saver sub, 5" HWDP, Jar, 5" HWDP. 11/29/2007 00:00 - 01:00 1.00 DRILL P INT1 Finish picking up BHA #2 and run in hole on 4" HWDP to 1,125'. 01:00 - 02:00 1.00 DRILL P INTi Pressure test kelly hose to 3,000 psi - OK. Pressure test Tam Port collar to 1,000 psi - OK. Shallow hole test MWD, 500 gpm, 1,100 psi. 02:00 - 05:30 3.50 DRILL P INT1 Continue running in hole picking up single joints of drill pipe from 1,125'to3,400'. 05:30 - 07:00 1.50 DRILL P INT1 Cut and slip drilling line. Clean out from under drawworks. Check brakes. 07:00 - 07:30 0.50 DRILL P INT1 Service topdrive, crown and drawworks. Connect blower hose to topdrive. 07:30 - 11:15 3.75 DRILL P INT1 Wash down from 3,430' to top of float collar on depth C~? 3,545'. Drill out float equipment and cement from 3,545' to 3,629'. Drill out rathole to 3 640'. 585 gpm, 2,110 psi off, 2,200 psi on. 8-10k WOB, 60 rpm, 2.1 k TO off, 4-6k TO on. PU - 120k, SO - 80k. Displaced mud from 9.4 ppg to new 8.8 ppg LSND while drilling out tail end of shoe track and rathole. 11:15 - 11:30 0.25 DRILL P INT1 Drill 20 ft of new hole from 3 640' to 3,660'. 585 gpm, 2,110 psi off, 2,200 psi on. i0k WOB, 60 rpm, 4k TO off, 4.8k TO on. PU - 120k, SO - 80k. 11:30 - 12:30 1.00 DRILL N DFAL INTi Attem t LOT. No test Pressure broke over ~ 220 psi. Check surface equipment and attempt retest several times without success. No problem with surface mud equipment. 12:30 - 13:00 0.50 DRILL N DFAL INT1 Wash to bottom and circulate @ 500 gpm, 1,090 psi, 60 rpm, 4k TO. 13:00 - 15:30 2.50 DRILL N DFAL INT1 Monitor well - OK. MW - 8.8 ppg. POH from 3,660' to 2,280'. Make u Tam closin tool. 15:30 - 16:00 0.50 DRILL N DFAL INTi Run in hole with closing tool to 1,020. Bit depth 3,305'. 16:00 - 17:30 1.50 DRILL N DFAL INT1 Latch into Tam collar and ick u 15k over to close. Test Tam to 1 000 si - OK. 17:30 - 18:30 1.00 DRILL N DFAL INT1 POH to Tam closing tool at surface. Laydown tool. 18:30 - 19:30 1.00 DRILL P INT1 Perform LOT: MD - 3,629', TVD - 3,374' Printed: 1/14/2008 8:57:30 AM ~ ~ BP EXPLORATION Page 6 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To '~ Hours Task Code'. NPT Phase ' Description of Operations 11/29/2007 18:30 - 19:30 1.00 DRILL P INTi LO pressure - 950 psi MW 8.8 PPg• EMW - 14.21 ppg. Blow down lines. 19:30 - 20:30 1.00 DRILL P INT1 Run in hole from 2,280' to 3,620'. Wash to bottom to 3,660'. No fill. 'Rotated ghost reamer through TAM collar. Tested to 300 psi - OK. 20:30 - 21:00 0.50 DRILL INT1 Obtain benchmark ECD's. CECD - 9.33 ppg. 21:00 - 23:30 2.50 DRILL P INT1 Drill 8 3/4" hole from 3,660' to 4,259'. MWD resistivity, gamma signals were erratic. 579 gpm, 1,540 psi off, 1,775 psi on. 100 rpm, 4.3k TO off, 5-6k TO on, 20k WOB. PU - 124k, SO - 91 k, RWT - 98k. ART - 1.43 hrs. CECD - 9.33 ppg, AECD - 9.75 ppg 23:30 - 00:00 0.50 DRILL N DFAL INTi Finish circulating out sweep to surface ~ 580 gpm, 1,540 psi, 100 rpm, 4k TO. CECD - 9.33 ppg, AECD - 9.5 ppg. Sweep did not bring any extra cuttings to surface. 11/30/2007 00:00 - 01:00 1.00 DRILL N DFAL INTi Monitor well - OK. 8.8 ppg MW. POH from 4,259' to 3,840'. Gradual overpull and hole swabbing. Pulled hard at 3,850'. 01:00 - 02:30 1.50 DRILL N DFAL INT1 Clean up tight spot and backream from 3,800' to 3,655'. 595 gpm, 1,800 psi, 60-80 rpm, 4-5k TQ. 02:30 - 06:00 3.50 DRILL N DFAL INT1 POH from 3,655' to inside of casing. 1st stand pulled in casing was swabbing. Circulated 15 minutes C~ 585 gpm, 1,500 psi, 80 rpm, 3.5k TO. POH dry and without problem to BHA C~ 268'. 06:00 - 07:00 1.00 DRILL N DFAL INT1 Stand back jar stand and drill collars. Laydown ARC and MWD. Check bit - OK. 07:00 - 08:30 1.50 DRILL N DFAL INT1 Pick up, make up new ARC and MWD. Orient and run in hole with drill collars and jar stands. 08:30 - 09:30 1.00 DRILL N DFAL INT1 Run in hole from 268' to 1,383'. 09:30 - 10:00 0.50 DRILL N DFAL INTi Shallow hole test MWD. 560 gpm, 1,040 psi - OK. Tested Tam collar to 300 psi - OK. 10:00 - 13:00 3.00 DRILL N DFAL INTi Continue running in hole from 1,383' to 3,850'. Set down at 3,850'. Wash through tight spot to 3,940' (10 min). 280 gpm, 600 psi, 60 rpm, 4.7k TO. PU - 125k, SO - 85k. Continue running in hole from 3,940' to 4,163' without problem. 13:00 - 13:30 0.50 DRILL N DFAL INTi Precautionary wash from 4,163' to bottom ~ 4,259'. No fill. 575 gpm, 1,645 psi, 40 rpm, 3.8k TO. PU - 127k, SO - 94k, RWT - 110k. Obtain parameters and slow pump rates. 13:30 - 00:00 10.50 DRILL P INT1 Directionally drill 8 3/4" hole from 4,259' to 5,890' 585 gpm, 2,160 psi off, 2,410 psi on. 100 rpm, 5.5k TO off, 7.6k TO on PU - 146k, SO - 109k, RWT - 123k, WOB - 10k CECD - 9.73 ppg, AECD - 10.12 ppg. AST - 2.57 hrs, ART - 3.20 hrs 12/1/2007 00:00 - 10:00 10.00 DRILL P INT1 Directionally drill 8 3/4" hole from 5,890' to 7,070'. 585 gpm, 2,880 psi off, 3,300 psi on. 100 rpm, 8k TO off, 11 k TO on PU - 155k, SO - 125k, RWT - 135k, WOB - 10-25k Printed: 1/14/2008 8:57:30 AM ~' BP EXPLORATION Operations Summary Report Legal Well Name: W-45 Page 7 of 21 Common W Event Nam Contractor Rig Name: Date ell Name: e: Name: From - To W-45 DRILL+C NABORS NABORS Hours OMPLE ALASK 9ES Task TE A DRI Code LLING NPT ', Start I Rig Rig Phase Spud Date: 11/24/2007 : 11/22/2007 End: 12/25/2007 Release: 12/25/2007 Number: Description of Operations 12/1/2007 00:00 - 10:00 10.00 DRILL P INT1 CECD - 10.8 ppg, AECD - 10.92 ppg. * @ 09:00 hr, started losing mud @ 7,050' @ 300 bph @ drillin rate. Losses declined as pump rate was re uce .Lost 150 bbls of mud initially, then another 75 bbls gradually *Pumped a 10.5 ppg weighted sweep @ 6,900' with no increase in cuttings when back to surface. *Started mud weight up from 9.1 ppg to 10.2 ppg @ 7,000'. *LV1WD log indicated top of fault @ 7,083' MD with 110 ft throw to the SW. 10:00 - 10:30 0.50 DRILL P INTi Check static loss. Fluid breathing back. Stage pumps from 200 gpm, 700 psi, up to drilling rate @ 585 gpm, 2,880 psi without losses. 10:30 - 12:00 1.50 DRILL P INT1 Continue directionally drilling from 7,070' to 7,141'. 585 gpm, 2,880 psi off, 3,300 psi on. 100 rpm, 8k TO off, 11 k TO on PU - 155k, SO - 125k, RWT - 135k, WOB - 25k CECD - 10.85 ppg, AECD - 11.03 ppg. AST - 4.15 hrs, ART - 2.75 hrs. Lost total of 225 bbls of 10.2 ppg LSND mud for the tour. 12:00 - 00:00 12.00 DRILL P INT1 Continue directionally drilling from 7,141' to 7,665'. 585 gpm, 3,110 psi off, 3,350 psi on. 100 rpm, 7k TQ off, 11 k TO on PU - 162k, SO - 125k, RWT - 143k, WOB - 15k CECD - 10.85 ppg, AECD - 11.12 ppg. AST - 7.80 hrs, ART - 2.65 hrs. No mud losses for tour. 225 total bbls lost for intermediate hole. 12/2/2007 00:00 - 09:00 9.00 DRILL P INTi Continue directionally drilling from 7,665" to -7,892' MD, 7,096' TVD. Not building angle. 550 gpm, 3,150 psi off, 3,200 psi on. All sliding PU - 170k, SO - 135k, RWT - 155k, WOB - 30k CECD - 10.76 ppg, AECD - 11.02 ppg. AST - 2.37 hrs, ART - 0.00 hrs. *Raised MW from 10.3 ppg to 10.4 ppg @ 7,800'. 09:00 - 12:00 3.00 DRILL P INT1 Backream from 7,892' to 6,924'. PU - 160k, SO - 125k, RWT - 130k. 550 gpm, 2,985 psi, 80 rpm, 5k TO. Slowed pulling speed @ 7,100' due to increase in ECDs. CECD - 10.76 ppg, AECD - 11.76 ppg. No mud losses for tour. 12:00 - 14:00 2.00 DRILL P INTi Continue backreaming from 6,924' to 6,540' @ slow pulling speed to to keep ECD's < than 1 ppg. Lower ghost reamer @ 4,384'. Started erratic torque and minor pack-off problems @ 6,540'. 550 gpm, 2,990 psi, 80 rpm, 5k TO. 14:00 - 15:00 1.00 DRILL P INT1 Continue backreaming from 6,540' to 6,400' with erratic torque. Partially packed off at 6,400' with diminishing returns. 500 gpm, 2,630 psi, 80 rpm, 5-9k TO. Slow pump rate to 455 gpm, 2,180 psi. Backream from 6,400' to 6,360' with diminishing returns. Lost all returns @ 6,360' bit depth, 4,204' ghost reamer de th. 15:00 - 17:30 2.50 DRILL P INT1 Continue backreaming from 6,360'to 6,160' without returns. Printed: 1/14/2008 8:57:30 AM ~ ~ BP` EXPLORATION Page 8 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ' Task Code NPT Phase 12/2/2007 15:00 - 17:30 2.50 DRILL P INT1 17:30 - 18:30 1.00 DRILL P INT1 18:30 - 23:30 I 5.001 DRILL I P I I INT1 23:30 - 00:00 I 0.501 DRILL I P I I INT1 12/3/2007 100:00 - 06:00 I 6.001 DRILL I P I I INT1 06:00 - 06:30 0.50 DRILL P INTi 06:30 - 09:00 2.50 DRILL P INTi 09:00 - 12:00 I 3.00 i DRILL I P I I INT1 12:00 - 14:00 2.001 DRILL ~ P INT1 14:00 - 14:30 I 0.501 DRILL I P I I INT1 14:30 - 15:30 I 1.001 DRILL I N I DFAL I INT1 15:30 - 16:30 I 1.001 DRILL I N I DFAL I INTi 16:30 - 19:00 2.50 DRILL N DFAL INT1 19:00 - 20:00 1.00 DRILL N DFAL INT1 20:00 - 21:00 1.00 DRILL N DFAL INT1 21:00 - 00:00 3.00 DRILL N WAIT INTi 12/4/2007 100:00 - 05:00 I 5.001 DRILL I N I WAIT I INT1 Description of Operations Slowed pump rate to 156 bpm, 600 psi, 50 rpm, 18-19k TQ, Run back in hole from 6,160' to 6,360'. Stage up to 550 gpm, 2,850 psi, 100 rpm, 4.5k TQ. Almost 100 % returns. Backream from 6,360' to 5,785' bit depth, 4,204' to 3,629' ghost reamer depth. 550 gpm, 2,850 psi to 6,020', then slowed to 400 gpm, 1,700 psi for mud loss control until ghost reamer up into casing. Circulate bottoms up from bit depth ~ 590 gpm, 2,940 psi ICP, 2,865 psi FCP, 110 rpm, 5k TQ, RWT 125k. Started circulation with 18 bph loss rate then quit losing mud. CECD - 11.06 ppg, initial AECD - 11.27 ppg, final AECD - 11.11 ppg. Lost 995 bbls of 10.4 ppg LSND mud. Lost total of 1,220, bbls total for intermediate hole. Monitor well - trick a going own ow ine. - 10.4 ppg. Pull 2 stands without pumping. Second stand was swabbing. POH, pumping out from 5,699' to 3,596' at 2 bpm, 280 - 460 psi. Pulling speed dictated by pump pressure. PU - 115K, SO - 95K. Blow down topdrive & monitor well -static. 6 bbl gain on trip out. Pulled from 4,600' without overpulls or pump pressure increase. Service topdrive, drawworks and crown. Monitor well -Static. POH from 3,596' to jars at 267' and stand back in derrick. No clay balling on ghost reamer when out of hole -junk slot area clear. PU - 100k, SO - 75k. Monitor well -static. PJSM. Clean & clear rig floor. Stand back jars & collars. Download data from MW D. (Necessary to know whether to stand back or lay down) Lay down MW D, stabilizer, motor, & bit. Bit grades-l-CT-N-X-1-NO-HP. Junk slot area on bit fully packed off w/ clay. Monitor well -static. Lost total of 1214 bbls LSND to well as of 12:00• MU BHA #4 - Hycalog 8 3/4" DTX619S-A2 bit, PDM with 1.5 deg ABH, NM Stab, ARC, MWD, NM DC, NM Stab, tea NM DCs, saver sub, 5" HWDP, Jar, 5" HWDP. Run in hole on 8 stands of 4" HWDP to 1,003' md. PU Single joint. MU top drive and rotate 25 rpm through TAM Collar assembly ~ 1,018' md. attempts. Pressure bleeding off to - 50 psi. LD Single joint. Pull out of hole 8 stands of 4" HWDP from 1,003' md. LD BHA #4. Mobilize TAM shifting tool. Load TAM Shifting tool into pipe shed. Safety stand down w/ entire Sullivan crew. Winds increased and snow blowing. Average wind speed 45 mph, gusting to 56 mph. All hands performed walk-around and secure any loose items exposed to weather conditions. Continue to wait on weather conditions to improve. Winds still Printed: 1/14/2008 8:57:30 AM `~ BP EXPLORATION Page 9 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To I~ Hours Task Code NPT Phase Description of Operations 12/4/2007 00:00 - 05:00 5.00 DRILL N WAIT INT1 05:00 - 06:00 1.00 DRILL N DFAL INTi 06:00 - 07:00 1.00 DRILL N DFAL INT1 07:00 - 08:00 1.00 DRILL N DFAL INT1 08:00 - 09:00 1.00 DRILL N DFAL INT1 09:00 - 11:00 2.00 DRILL N DFAL INTi 11:00 - 12:30 I 1.501 DRILL I N I DFAL I INTi 12:30 - 13:00 0.50 DRILL P INTi 13:00 - 14:00 1.00 DRILL P INTi 14:00 - 15:15 1.25 DRILL P INT1 15:15 - 16:30 1.25 DRILL P INT1 16:30 - 17:15 0.75 DRILL P INTi 17:15 - 18:00 0.75 DRILL P INT1 18:00 - 19:30 1.50 DRILL P INT1 19:30 - 00:00 4.50 DRILL P INTi 12/5/2007 100:00 - 06:00 I 6.001 DRILL I P 06:00 - 12:00 6.00 DRILL P 12:00 - 21:00 9.00 DRILL P 21:00 - 22:00 1.00 DRILL P 22:00 - 22:15 0.25 DRILL P 22:15 - 23:45 1.50 DRILL P INT1 INT1 blowing 40 and gusting to 50 mph. MU TAM shifitng tool BHA. RIH w/ TAM shifting tool 1,000' md. Position shifting tool swab cups over TAM collar ~ 1,018'. Slack off 3k to confirm latch. Pressure up to 500 psi -Good test -TAM collar still closed. Pick up 5k tension and rotate to release from collar. POH w/ TAM shifting tool & lay down same. PJSM. MU BHA #5 - Hycalog 8 3/4" DTX619S-A2 bit, PDM with 1.5 deg ABH, NM Stab, ARC, MWD, NM DC, NM Stab, tea NM DCs, saver sub, 5" HWDP, Jar, 5" HWDP. Run in hole on 8 stands of 4" HWDP to 1,003' md. PU Single joint. MU top drive and rotate 25 rpm through TAM Collar assembly with 2 stands of drillpipe. Shallow hole test MWD, 550 gpm, 1,540 psi - OK. Continue running in hole to surface casing shoe at 3,629. Circulate bottoms up at shoe. 585 gpm, 2330 psi. RIH on 4" DP from derreck from 3,629' and to 6,165' md. Break circulation and stage pumps up to 550 gpm, 2800 psi while reciprocating pipe in 25' strokes. PU - 148k, SO - 112k Continue RIH on drillpipe to 7,710' md. 25k drag seen from 6,320' - 6,340'. Precautionary wash last 2 stands to bottom @ 7,892' md. 100' of soft fill on bottom. PU - 185k, SO - 125k, RTW - 150k, 80 rpm, 4.1 k TO, 550 gpm, 3150 psi. Directional Drill 8-3/4" hole from 7,892' to 8,025'. 550 gpm, 3,240 psi off, 3,550 psi on. 80 rpm, 4.4k TO off, 7.5k TO on, 20k WOB. PU - 182k, SO - 132k, RWT - 152k. AST - 3.05 hrs, ART - .08 hrs. CECD - 11.04 ppg, AECD - 11.10 ppg Directional Drill 8-3/4" hole from 8,025' TO 8,652'. 550 gpm, 3,240 psi off, 3,550 psi on. 90 rpm, 5.4k TO off, 8.2k TO on, 20k WOB. PU - 180k, SO - 137k, RWT - 153k. CECD - 10.96 ppg, AECD - 11.45 ppg Directional Drill 8-3/4" hole from 8,652' to 9,201' md. 550 gpm, 3,440 psi off, 3,850 psi on. 80 rpm, 6.Ok TO off, 9.Ok TO on, 20k WOB. PU - 190k, SO - 140k, RWT - 162k. CECD - 11.16 ppg, AECD - 11.38 ppg AST - 4.6 hrs, ART - 3.66 hrs. INT1 Directional Drill 8-3/4" hole from 9,201' to 9,695' md. 550 gpm, 3,460 psi off, 3,780 psi on. 80 rpm, 6.2k TO off, 9.8k TO on, 20k WOB. PU - 201 k, SO - 145k, RWT - 162k. CECD - 11.16 ppg, AECD - 11.36 ppg AST - 4.44 hrs, ART - 5.05 hrs. 27 bbls lost to formation for evening tour. INT1 Circulate up sample from 9,695' md. INTi Directional Drill from 9,695' to TD C~ 9,715' md. INT1 Circulate up sample from 9,715' and and confirm TD w/ Sag Printed: 1/14/2008 8:57:30 AM ~ • BP EXPLORATION Page 10 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABORS 9ES Rig Number: Date I From - To Hours Task ' Code' NPT Phase Description of Operations 12/5/2007 22:15 - 23:45 1.50 DRILL P INT1 River sandstone. 23:45 - 00:00 0.25 DRILL P INT1 Prepare to backream from TD to 7,892' md. 12/6/2007 00:00 - 06:45 6.75 DRILL P INTi Backream from TD @ 9,715' and to 8,050' md. 500 gpm, 2,950 psi, 80 rpm, 6.2k TQ PU - 200k, SO - 125k, RWT - 150k. CECD - 11.2 ppg, AECD - 11.68 ppg Started losin mud to formation at 10-15 b h C~3 -9 020' md. No static losses. 06:45 - 07:15 0.50 DRILL P INT1 Pull last two stands pumps off to 7,868' md. PU - 200k, SO - 125k. 10-15k overpulls. on 1st stand, pulled clean on 2nd stand. monitor well -static. Blow down topdrive. 07:15 - 08:30 1.25 DRILL P INT1 Run back in hole from 7,868' and to 9,715' md. Precautionary was last stand to bottom. No fill found and no problems encountered on trip in hole. 08:30 - 11:30 3.00 DRILL P INTi Pump 40 bbls hi-vis sweep surface to surface. Rotate and reciprocate pipe while circulating. 10% increase in cuttings noticed at surface when sweep returned. PU - 210k, SO - 135k, RTW - 170k. 50 rpm, 7.5k TO, 500 gpm, 3190 psi. 11:30 - 12:00 0.50 DRILL P INTi Shut down, monitor well -static. Pump dry job. Blow down top drive. 12:00 - 19:00 7.00 DRILL P INTi POOH from 9,715' -top of BHA ~ 267'. Wiped intermittent 25k tight spots from 7718' - 7600' & 15k tight spots from 7600' - 7300'. Total of 20 bbls lost to formation on trip out of hole. 19:00 - 23:00 4.00 DRILL P INTi PJSM. Lay down BHA #5 - MWD, stabilizer, motor, & bit. Bit grade 1-1-CT-A-X-1-WT-TD. Glean & clear rig floor. Monitor well -static. 23:00 - 00:00 1.00 CASE P INT1 RU to change upper pipe rams to 7" for casing run. 12/7/2007 00:00 - 03:00 3.00 CASE P INT1 Close blind rams & change out upper pipe rams from 3.5" x 6" VBRs to 7". 03:00 - 04:00 1.00 CASE P INTi Rig up and test 7" rams to 3,500 psi - OK. Rig down test equipment. Test witnessed by P W L Matt Martyn and NAD TP Tim Leigh. 04:00 - 08:00 4.00 CASE P INTi Pull wear ring, make dummy run with 7" hanger and landing joint. Rig up to run casing. 08:00 - 16:30 8.50 CASE P INT1 PJSM. Pick up and make up (Baker Lok) 7" shoe track. Check floats - OK. Continue running in hole ~ 1.5 minutes per joint with 89 joints of 7" 26# L-80 BTC-M to surface casing shoe. 3,616'. Make up casing to mark with average make-up torque of 8,600 fUlbs. Used BOL-2000 M pipe lubricant. Fill each joint and break circulation every 20 joints. PU - 119k, SO - 104k Ca? 3,616' 16:30 - 18:00 1.50 CASE P INT1 Circulate 2 bottoms up and reciprocate pipe ~ casing shoe. Stage pumps up 2, 3, 4, & 5 bpm. Each time pumps brought up to new rate well took fluid, but stabilized. Spent 30 minutes circulating at 5 bpm, 400 psi w/ no losses before shutting down. 18:00 - 20:00 2.00 CASE P INT1 Continue running in hole ~ 3 minutes per joint with joints 89 - 114 and thread crossover joint of 7" 26# L-80 BTC-M to 4,694'. Make up casing to mark with average make-up torque of 8,600 fUlbs. Used BOL-2000 M pipe lubricant. Fill each joint and break circulation @ 2 bpm every 10 joints. Losing 25% of fluid Printed: 1/14/2008 8:57:30 AM ~ • BP EXPLORATION Operations Summary Report Legal Well Name: W-45 Page 1 1 of 21 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date ~~ From - To Hours Task Code NPT Phase Description of Operations 12/7/2007 18:00 - 20:00 2.00 CASE P INTi pumped while circulating. No static losses. PU - 145k, SO - 20:00 - 21:00 1.00 CASE P INTi Rig up torque turn equipment for TC-II casing. Circulate and reciprocate pipe while rigging up. Pumping 2 bpm 400 psi. Losing 1 bpm while pumping. 21:00 - 00:00 3.00 CASE P INT1 Continue running in hole @ 3 minutes per joint with 7" 26# L-80 TC-II casing from 4,694' to 5,721'. Fill each joint and break circulation every 10 joints C~ 2 bpm. Losses still at 1 bpm while um in and static when not um in .Torque Turn casing to make-up torque of 10,100 ft/Ibs. Used JetLube Seal Guard pipe lubricant. 25 joints of TC-II casing run so far. PU - 170k, SO - 124k C~? 5,721'. Total losses for day of 83 bbls. 12/8/2007 00:00 - 01:30 1.50 CASE P INT1 Continue running in hole C~3 3 minutes per joint with 7" 26# L-80 TC-II casing from 5,721' to 6,339'. Fiil each joint and break circulation after 10 joints ~ 2 bpm. Losses still at 1 bpm while pumping and static when not pumping. Torque Turn casing to make-up torque of 10,100 ft/Ibs. Used JetLube Seal Guard pipe lubricant. 40 joints of TC-II casing run so far. PU - 188k, SO - 131 k @ 6,339'. 01:30 - 03:00 1.50 CASE P INT1 Attem t to break circulation after'oint number 40. Brin m up to 2 b m and only a trickle of returns. No losses with pumps off. Only able to get returns on upstroke of pipe reciprocation. Vary pump rates from 1-4 bpm while pulling 60' of casing stroke in attempt to break circulation but returns always fell back to zero after pipe movement stopped. Lost -120 bbls to formation while t in to break circulation, 03:00 - 03:30 0.50 CASE P INT1 Pre-job safety meeting for laying down 10 joints to re-establish circulation and thin back mud. Rig up single joint elevator to lay down joints. 03:30 - 07:30 4.00 CASE P INTi Lay down 8 joints of 7" TC-II casing to 5,970'. Attempt to regain circulation after 3, 6, & 9 joints out of hole but results same as before. 100% losses while pumping, and_well_static 07:30 - 12:30 5.00 CASE P INT1 Continue running in hole C~ 3 minutes per joint with 7" 26# L-80 TC-II casing from 6,339' to just above the top of the Kingak C~ 8,296'. Fill each joint and pump away 15 bbls (annular volume of 10 joints) every 10 joints C~ 3 bpm. No returns while um in and no losses when not um in .Torque Turn casing to make-up torque of 10,100 ft/Ibs. Used Jet Lube Seal Guard pipe lubricant. 88 joints of TC-II casing run so far. PU - 250k, SO - 150k C~3 8,296'. 12:30 - 13:00 0.50 CASE P INTi Circulate 75 bbls while reciprocating pipe prior to entering Kingak formation. Pumping 3 bpm, 650 - 600 psi. Shut down pumps, monitor well -Static. 13:00 - 15:00 2.00 CASE P INT1 Continue running in hole C~ 3 minutes per joint from just above the top of the Kingak ~ 8,296' to 9,440'. Fill pipe each joint but no returns to surface. Did not circulate down any joints. 116 joints of TC-II casing run so far. PU - 315k, SO - 150k C~ 9,440'. 15:00 - 17:00 2.00 CASE P INT1 Work pipe downhole from 9,440' to 9,562' md. On joint 117 9,440', set down 80k+ weight while trying to RIH. Work pipe down next 3 joints. PU - 315k-375k. Make several attempts to work pipe down without pumping -unable. Bring pumps on as Printed: 1/14/2008 8:57:30 AM • • BP EXPLORATION Page 12 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ' Task Code NPT ' Phase ', Description of Operations 12/8/2007 15:00 - 17:00 2.00 CASE P INT1 necessary to work pipe downhole. 17:00 - 17:30 0.50 CASE P INT1 Run 3 joints in hole from 9,562' to 9,682' and - OK. PU - 315k, SO - 150k. 17:30 - 20:30 3.00 CASE P INT1 Settin down again while running last full joint landing hanger. Work pipe down last joint & landing joint w/ hanger. Reciprocate and pump as necessary. Pumps packing off many times when stacking out weight on shoe. Land hanger on ring C~ 20:20 w/ 150k downweight. HES Float Shoe -Bottom C~ 9,712' 2 Jts 7", 26#, L-80 BTC-Mod (#1-2) HES Landing Collar - Top ~ 9,627' 112 Jts 7", 26#, L-80 BTC-Mod (#3-114) 7", 26#,L-80 TC-II X BTC-Mod Crossover Pup. @ 5,027' 7" 26# L-80 TC-I I Pup Jt. 122 Jts 7", 26#, TC-II (#1-122) FMC Hanger & Hanger Pup. Total of 98 - 7 1/8" x 8 1/4" Rigid Straight Blade Centralizers: 2 centralizers on shoe joint w/ stop ring 5' from shoe & 1 per joint from top of Kingak to top of cement. 20:30 - 21:00 0.50 CEMT P INT1 Rig down Frank's tool. Make up cementing head. 21:00 - 22:00 1.00 CEMT P INT1 PJSM w/ cementing crew. Stage pumps up to 5 bpm, 730 psi and reciprocate casing 3 ft strokes. PU - 315k, SO - 160k. 22:00 - 00:00 2.00 CEMT P INT1 Switch to owell. Pump 10 bbls water. Pressure test lines to 4,000 psi - OK. Pump 41 bbls 11.5 ppg of MudPush II viscosified spacer @ 5 bpm, 600 psi. Start pumping lead (~ 5-6 bpm, 550 psi. 12/9/2007 00:00 - 02:00 2.00 CEMT P INT1 Continue to mix and pump total of 169 bbls 12.0 ppg lead cement followed by 23.8 bbls Class "G" 15.8 ppg cement C~3 5 bpm avg, 100 - 300 psi. Drop plug and chase w/ 10 bbls H2O. Swap to rig pumps. Displace cement with 258.6 bbls of 10.6 ppg mud. 1st 200 bbls C~3 5 bpm, 135 psi ICP, 210 psi FCP. Reduce rate to 4 bpm for 100 bbls - 200 psi ICP, 814 psi FCP. Reduce rate to 3 bpm for next 40 bbls - 841 psi ICP, 888 psi FCP. Bump plug ~ 2 bpm 815 psi C~ 6032 strokes.. Stopped reci rocatin and landed casin with 250 bbls awa . PU - 350k, SO - 140k. No returns to surface throughout entire job. Lost all 606 bbls pumped. Good lifiting pressure. CIP ~ 02:05 hrs. 02:00 - 02:30 0.50 CEMT P INT1 Pressure test casin to 3500 si. Good test. Bleed off & check floats. 02:30 - 04:30 2.00 CEMT P INT1 Lay down all casing and cementing equipment. Blow down cementing lines. 04:30 - 07:30 3.00 CASE P INT1 Install 7" Packoff and run in lock down screws. Torque to 450 ft-Ibs. Test to 5000 psi for 10 min., Good Test. Change out casing running bales and elevators. Clean and clear rig floor 07:30 - 09:00 1.50 CASE P INT1 Conduct LOT down 9-5/8" x 7" annulus to 12.7 ppg. Leak off pressure at 380 psi w/ 10.6 ppg mud. Inject 1.8 bbls during leak off test. 'Note: Outside of critical path, inject 1 bbls used LSND mud into OA every 2 hours. no increase in leak off pressure. Total Printed: 1/14/2008 8:57:30 AM ~ ~ BP EXPLORATION Page 13 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date ~~ From - To Hours Task Code NPT Phase Description of Operations 12/9/2007 07:30 - 09:00 1.50 CASE P INT1 volume pumped for LOT and to maintain open annulus was 10 bbls. 09:00 - 12:00 3.00 BOPSU P INT1 Change Upper Pipe Rams back to 3 1/2 x 6 variables. Change out saver sub on topdrive. 12:00 - 14:00 2.00 BOPSU P INT1 Make up BOPE floor equipment. Install test plug. Fill all testing lines. 14:00 - 19:30 5.50 BOPSU P INT1 Test BOPE & Floor manifold to 250 si low and 3500 psi high . Test Annular preventer to 250 psi low and 3500 psi high. Witness of test waived by AOGCC representative Lou Grimaldi. Test witnessed by BP WSLs Alan Madsen & Matt Martyn, NAD Toolpushers Ronnie Dalton & Tim Leigh. 19:30 - 21:00 1.50 BOPSU P INT1 Install wear ring. RD from BOP testing. Prepare to make up BHA#6. 21:00 - 23:00 2.00 DRILL P PROD1 Pick up BHA #6 - 6-1/8" MXR-18HDX Hughes insert bit, 1.83 degree PDM motor, MWD, tea NM Flex DC, Jars. Length to jars = 180'. Note: Sim Ops - OA injection and freeze protection: Inject 49 bbls 10.6 ppg LSND mud ~ 3 bpm, 700 psi to flush annulus. RU Little Red & pump 65 bbls 90 deg dead crude C~ 2 bpm, 750 ICP, 820 FCP, 590 SIP. 23:00 - 00:00 f.00 DRILL P PROD1 RIH w/ BHA #6 on 10 stands of 4" DP from derrick to 179' - 1,135' md. PU - 45k, SO - 45k. 12/10/2007 00:00 - 00:30 0.50 DRILL P PROD1 Shallow test MWD ~ 1,135'. 260 gpm, 1000 psi - OK. 00:30 - 02:00 1.50 DRILL P PROD1 RIH w/ 6-1/8 build BHA #6 on 4" drillpipe from derrick and pipeshed as needed from 1,135' - 3,240' md. PU - 96k, SO - 77k. 02:00 - 04:30 2.50 DRILL P PROD1 Slip and cut 103' of drilling line. Service topdrive. Clean out under draw works. 04:30 - 09:00 4.50 DRILL P PROD1 RIH on 4" DP 1x1 from pipeshed from 3,240' and to 7,260' md. 09:00 - 09:30 0.50 DRILL P PROD1 Circulate drill string volume to ensure no debris in newly picked up drillpipe. 169 gpm, 1024 psi. Shut down pumps, blow down topdrive. 09:30 - 11:30 2.00 DRILL P PROD1 RIH on stands of DP in derrick from 7,260' - 9,554' md. 11:30 - 14:00 2.50 DRILL P PROD1 Wash down to top of cement at 9,615'. Drill cement to 9,700'. 275 gpm, 1,950 psi off, 2,150 psi on, 50 rpm, 9k TO off, 10k TO on. PU - 220k, SO - 125k, RTW - 170k. Started mud swap above Float Shoe. Did not drill new hole with 10.6 ppg mud in annulus due to proximity of the Sag River sand. 14:00 - 15:00 1.00 DRILL P PROD1 Finish displacing from 10.6 ppg LSND mud to 8.4 ppg FlowPro mud. 275 gpm, 2,410 psi ICP, 1,240 psi FCP. 50 rpm, 11.5k initial TO, 5.1 k final TO. 15:00 - 15:30 0.50 DRILL P PROD1 Shut down once new mud to surface to clean ditches and flush old 10.6ppg mud from system. 15:30 - 16:30 1.00 DRILL P PROD1 Drill remaining rathole and 20' of new hole from 9,715' to 9,735'. 275 gpm, 1,260 psi on, 1,140 psi off, 50 rpm, 5.4k TO off, 6.Ok TO on, PU - 200k, SO - 145k, RTW - 160k. 16:30 - 17:00 0.50 DRILL P PROD1 Circulate bottoms up. Printed: 1/14/2008 8:57:30 AM ~ • BP EXPLORATION Page 14 of 21 i, i Operations Summary Report ~~, Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To ~-Hours Task Code NPT Phase Description of Operations I _ _ - _ _-- - --- 12/10/2007 17:00 - 18:00 1.00 DRILL P PROD1 Attem t FIT to 11.5 -Failed. Perform LOT to 10.75 ppg w/ 8.4 flo- ro. Leak off pressure 1050 psi. 18:00 - 00:00 6.00 DRILL P PROD1 Directional drill 6.125" hole from 9,735' to 9,842'. 12/11/2007 ~ 00:00 - 01:30 ~ 1.501 DRILL ~ P 01:30 - 02:00 I 0.501 DRILL I P PROD1 PROD1 02:00 - 03:00 I 1.001 DRILL I N I SFAL (PROD1 03:00 - 12:00 I 9.001 DRILL I P 12:00 - 18:30 6.501 DRILL P 18:30 - 19:30 I 1.001 DRILL I P 19:30 - 20:00 I 0.501 DRILL I P 20:00 - 20:30 20:30 - 00:00 0.50 DRILL P 3.50 DRILL P 12/12/2007 00:00 - 00:30 00:30 - 01:30 01:30 - 03:30 03:30 - 07:30 0.50 DRILL P 1.00 DRILL P 2.00 DRILL P 4.00 DRILL P 07:30 - 13:30 I 6.001 DRILL I P PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 275 gpm, 2,070 psi on, 1,670 psi off, 50 rpm, 6k TO on, 4k TO off, WOB - 20k, PU - 190k, SO - 155k, RTW - 164k. AST - 2.60 hrs, ART - 1.17 hrs. Directional drill 6.125" hole from 9,842' to 9,870'. 275 gpm, 1,980 psi on, 1,680 psi off, 50 rpm, 6k TO on, 4k TO off, WOB - 20k, PU - 190k, SO - 155k, RTW - 164k. Gas bubbling in returns at bottoms up after connection made ai 9,841' After 5 bbl loss in 40 minutes, shut down, monitor well -static. No flow from well. No discoloration noticed in returns. Discover Flo-pro mud airing up when hopper operated. No actual losses to well. Troubleshooting toolface display screen - inoperable. Pull uphole 3 stands to casing shoe. Circulate at 9,630' and while troubleshooting toolface display screen. Trace problem to faulty signal cable connection. Fix connection & run back in hole. Directional drill 6.125" hole from 9,870' to 10,224'. 265 gpm, 1,920 psi on, 1,750 psi off, 50 rpm, 4.5k TO on, 3.5k TO off, WOB - 15-25k, PU - 190k, SO - 155k, RTW - 164k. More gas in returns bubbling up in returns after bottoms up from back on bottom drilling. No further indication of Shublik effect after 03:30 hrs Directional drill 6.125" hole from 10,224' - 10,511' md. 260 gpm, 2,000 psi on, 1,700 psi off, 50 rpm, 9.Ok TO on, 5.Ok TO off, WOB - 25k, PU - 180k, SO - 142k, RTW - 160k. (Inc now at 95+ deg.) AST - 7.33 hrs, ART - 2.61 for the day. Shut down, monitor well -Static. Backream out of hole from 10,511' to 9,711' C~ 1,000 fph. 250 gpm, 1,585 psi , 50 rpm, 5.Ok TO, PU - 175k, SO - 145k, RTW - 160k. No problems reaming out. Pulled slick. Circulate bottoms up @ casing shoe. 250 gpm, 1,585 psi , 15 rpm, 4.Ok TO. Shut down, monitor well -static. MW in - 8.5ppg, MW out - 8.5+ppg. Pump 22 bbl 9.9 ppg salt dry job. Remove blower hose. Blow down top drive. Install air slips. POH from 9,711' and to 2,283' md. PU - 75k, SO - 70k. No losses to well for the day. Service topdrive. Continue POH from 2,283' and to 179' (top of jars). PJSM. Lay down BHA #6. Bit grade 2-6-WT-A-E-3-LT-BHA. PJSM. MU BHA #7 - 6-1/8" DTX613-615 PDC bit, AIM PDM 1.5 deg bend, NM Stab, MWD, ADN, 2 ea. NM Flex DC, CCV, Daily Drilling Jars. RIH with BHA # 7 from 228' to 9,613'. Shallow hole tested Printed: 1/14/2008 8:57:30 AM ~ • BP EXPLORATION Page 15 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To Hours ' Task Code NPT __ 12/12/2007 07:30 - 13:30 6.00 ~ DRILL P Spud Date: 11/24/2007 Start: 11/22/2007 End: 12/25/2007 Rig Release: 12/25/2007 Rig Number: Phase Description of Operations PROD1 13:30 - 17:30 I 4.001 DRILL I P 17:30 - 18:30 I 1.001 DRILL I P 18:30 - 00:00 I 5.501 DRILL I P 12/13/2007 100:00 - 06:00 I 6.001 DRILL I P 06:00 - 12:00 I 6.001 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 12/14/2007 ~ 00:00 - 06:00 ~ 6.00 ~ DRILL ~ P 06:00 - 12:00 I 6.001 DRILL I P PROD1 PROD1 PROD1 PROD1 MWD ~ 1,160', 250 gpm, 991 psi. PU - 180k, SO - 150k. Fill pipe at shoe and take SPRs. Finished running in hole without problem to 10,360. MAD pass looking for gas-oil contact from 10,360' bit depth to 10,081'. 50 rpm, 5k TO, 270 fph, 250 gpm, 1880 psi. PU - 180k, SO - 140k, RTW - 155k Take surveys to 9,902' md. RIH from 9,902' to 10,511'. Finished running in hole without problem to 9,664. Pick up last full stand and wash down from 10,400' to 10,511'. Found 31' of fill on bottom. PU - 180k, SO - 140k, RTW - 165k 220 gpm, 1675 psi, 60 rpm, 6k TO. Directional drill 6.125" hole from 10,511' - 10,718' md. 250 gpm, 1,950 psi on, 1,780 psi off, 60 rpm, 8.Ok TO on, 5.Ok TO off, WOB - 25k, PU - 185k, SO - 142k, RTW - 165k. AST - 1.53 hrs, ART - 1.65 for the day. Directional drill 6.125" hole from 10,718 - 10,810' md. 240 gpm, 1,800 psi on, 1,700 psi off, 60 rpm, 6.Ok TO on, 5.Ok TO off, WOB - 5-25k, PU - 180k, SO - 142k, RTW - 160k. Began losing 20 bph ~ -10,740' to 10,775'. Prepare LCM Pill Losses increased to -200 bph C~3 10,775'. Pump 30 bbl LCM Losses decreased to 30 bph after LCM around corner. Lost 270 bbls from 00:00 - 06:00. Loss rate still -30 bph. PROD1 Directional drill 6.125" hole from 10,810' - 11,017' md. 240 gpm, 1,860 psi on, 1,520 psi off, 60 rpm, 6.5k TO on, 4.5k TO off, WOB - 5-25k, PU - 190k, SO - 145k, RTW - 165k. Pump 30 bbl LCM Pill (40 ppb) and no noticable change in loss rate. Still drilling ahead with 30 bph losses. Stringing LCM into mud. PROD1 Directional drill 6.125" hole from 10,810' - 11,560' md. 240 gpm, 1,860 psi on, 1,520 psi off, 60 rpm, 6.5k TO on, 4.5k TO off, WOB - 5-25k, PU - 190k, SO - 145k, RTW - 165k. Still drilling ahead with 30-45 bph losses. Stringing LCM into mud. Total of 758 bbls mud lost for da AST - 7.25 hrs, ART - 6.21 hrs PROD1 Directional drill 6.125" hole from 11,560' - 11,790' md. 240 gpm, 1,920 psi on, 1,670 psi off, 60 rpm, 7.5k TO on, 5.5k TO off, WOB - 5-15k, PU - 185k, SO - 140k, RTW - 165k. Still drilling ahead with 30 bph losses. Stringing LCM into mud. PROD1 Directional drill 6.125" hole from 11,790' - 11,865' md. 250 gpm, 1,950 psi on, 1,700 psi off, 60 rpm, 7k TO on, 6k TO off, WOB - 5-25k, PU - 192k, SO - 142k, RTW - 165k. Still drilling ahead with 30-45 bph losses. Stringing LCM into mud. Printed: 1/14/2008 8:57:30 AM r BP EXPLORATION Page 16 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 .Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations 12/14/2007 12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 6.125" hole from 11,790' - 12,355' md. 250 gpm, 1,950 psi on, 1,700 psi off, 60 rpm, 7k TO on, 6k TO off, WOB - 5-25k, PU - 192k, SO - 142k, RTW - 165k. Still drilling ahead, losses reduced to 20 bph. Stringing LCM into mud. AST - 8.9 hrs, ART - 7.85 hrs 12/15/2007 00:00 - 06:00 6.00 DRILL P PROD1 Directional drill 6.125" hole from 12,355' - 12,502' md. 250 gpm, 1,700 psi on, 1,550 psi off, 60 rpm, 8k TO on, 6.7k TO off, WOB - 5-15k, PU - 192k, SO - 140k, RTW - 165k. 30 bph losses. Stringing LCM into mud. 06:00 - 12:00 6.00 DRILL P PROD1 Directional drill 6.125" hole from 12,502' - 12,616' md. 250 gpm, 1,750 psi on, 1,585 psi off, 60 rpm, 7k TO on, 6k TO off, WOB - 5-10k, PU - 200k, SO - 130k, RTW - 170k. 20 bph losses. Stringing LCM into mud. 12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 6.125" hole from 12,616 - 12,743' md. 244 gpm, 1,850 psi on, 1,685 psi off, WOB - 5-10k, PU - 200k, SO - 130k 10 - 20 bph losses. Stringing LCM into mud. AST - 13.18 hrs, ART - 3.68 hrs 12/16/2007 00:00 - 06:00 6.00 DRILL P PROD1 Directional drill 6.125" hole from 12,743' - 12,820' md. 250 gpm, 1,850 psi on, 1,645 psi off, 60 rpm, 8k TO on, 6.7k TO off, WOB - 5-15k, PU - 200k, SO - 130k, RTW - 165k. 10-15 bph losses. Stringing LCM into mud. 06:00 - 12:00 6.00 DRILL P PROD1 Directional drill 6.125" hole from 12,820' - 13,047' md. 250 gpm, 1,960 psi on, 1,712 psi off, 60 rpm, 7k TO on, 6.5k TO off, WOB - 5-10k, PU - 200k, SO - 130k, RTW - 165k. -15 bph losses. Stringing LCM into mud. 12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 6.125" hole from 13,047 - 13,399' md. 250 gpm, 2,150 psi on, 1,720 psi off, 60 rpm, 7k TO on, 6k TO off, WOB - 5-10k, PU - 195k, SO - 130k, RTW - 165k. 15 - 45 bph losses. Stringing LCM into mud. AST - 13.18 hrs, ART - 3.68 hrs 12/17/2007 00:00 - 02:30 2.50 DRILL P PROD1 Directional drill 6.125" hole from 13,399' to TD C~ 13,475' md.~ 250 gpm, 2,150 psi on, 1,720 psi off, 60 rpm, 7k TO on, 6k TO off, WOB - 5-10k, PU - 195k, SO - 130k, RTW - 165k. Losses increased from 10-15bph to 30-40bph in last 100' md. AST - 0 hrs, ART - 1.43 hrs 02:30 - 02:45 0.25 DRILL P PROD1 Circulate 15 minutes to clear cuttings from around BHA. 242 gpm, 1736 psi. 02:45 - 18:30 15.75 DRILL P PROD1 Backream out of hole 13,475' - 9,698' md. MAD passing ~ no faster than 600 fph. 60 rpm, 3.5-4k TO, 244 gpm, 1650 psi. PU - 205k, RTW - 165k Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT 12/17/2007 02:45 - 18:30 15.75 DRILL P 18:30 - 19:30 1.00 DRILL P 19:30 - 20:00 0.501 DRILL P 20:00 - 00:00 4.00 ~ DRILL ~ P 12/18/2007 100:00 - 05:30 I 5.501 DRILL I P 05:30 - 08:30 3.001 DRILL ~ P Start: 11 /22/2007 Rig Release: 12/25/2007 Rig Number: Page 17 of 21 Spud Date: 11 /24/2007 End: 12/25/2007 Phase Description of Operations PROD1 Losses @ 15 bph. PROD1 Circulate bottoms up from 9,698' md. 40 rpm, 3-4k TO, 250 gpm, 1470 psi, RTW - 165k. Reciprocate pipe 25' while pumping. Losses @ 10 bph. Pump 30 bbl 9.9 ppg solids free dry job prior to shut down. PROD1 Monitor well -Static. Blow down and service topdrive. Install Air slips. PROD1 POH from 9,698' - 4,596' and in stands until 101 stands racked back in derrick for liner and perforating jobs. PROD1 POH laying down drill pipe & HWDP from 4,531' to BHA @ 228' md. PROD1 PJSM for removing nuclear source & laying down BHA. Laydown BHA. Break bit and laydown motor. (Motor wear pad had excessive wear, bit out of guage 1/2") With AIM hanging in elevators, MWD service hand mistakenly removed set screw on AIM battery slot, causing a small release of gas. Evacuate floor as a precaution and contact Anadrill. 08:30 - 11:30 I 3.001 DRILL I N I HMAN I PROD1 Wait on Anadrill safety rep. Perform hazard assessment. Don 11:30 - 12:00 I 0.501 DRILL I P 12:00 - 13:00 1.00 DRILL P 13:00 - 17:00 4.00 CASE P 17:00 - 00:00 7.001 CASE ~ P 12/19/2007 100:00 - 04:00 I 4.001 CASE I P 04:00 - 06:00 I 2.001 CASE I P 06:00 - 07:30 1.501 CASE P 07:30 - 08:00 I 0.501 CASE I P 08:00 - 14:00 I 6.001 CASE I P 14:00 - 16:00 2.00 CASE P 16:00 - 18:30 2.50 CASE P proper PPE. PRODi Safely laydown AIM and move tool to safe area on pad. 'Lost 100 bbls of mud from midnight to noon. PROD1 Clear and clean rig floor. RUNPRD Rig up to run 4.5" 13Cr Vam Top production liner with torque turn and compensator equipment. RUNPRD PJSM with all involved personnel. Pick up, Baker Lok, and make up shoe track. Check floats - OK. Continue running in hole with 4.5" 12.6# 13Cr Vam Top production liner to 2,380'. Used Jet Lube Seal Guard pipe dope and made up connections to 4,440 ft/Ibs of torque. 'Lost 182 bbls of mud from noon to midnight. 'Total loss for 6 1/8" hole - 2.688 bbls. RUNPRD Continue running in hole with 4.5" 12.6# 13Cr Vam Top production liner from 2,380' to 3,891'. Ran total of 93 joints of liner. Fili every 10 joints. Loss rate @ 10-15 bph. RUNPRD PJSM. Rig down compensator, change out bales and elevators. Clear rig floor. RUNPRD Make up Baker Flex Lock liner hanger and ZXP liner top packer. Make up XO and drill pipe pup joint. Run in hole with one stand of drill pipe. RUNPRD Circulate liner volume. Stage pump up from 2 bpm, 235 psi to 3 bpm, 265 psi. Started with 120 bph loss rate then tapered off to 0 loss rate towards end of circulation. PU - 80k, SO - 73k. RUNPRD Run in hole with liner on drill pipe from 4,040' to 9,611' @ 2 min per stand and fill every 10 stands. PU - 160k, SO - 130k. 'Lost 50 bbls from midni ht to noon. RUNPRD Circulate bottoms up. Stage pump up from 1 bpm, 420 psi, 2 bpm, 505 psi, 3 bpm, 555 psi, 5 bpm, 660 psi. Lost 50 bbls. No losses at end of circulation. ` RUNPRD Run in hole from 9,611' to bottom @ 13,475 @ 2 min per stand Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Page 18 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT 12/19/2007 18:30 - 20:0 1.50 CEMT P 20:00 - 20:30 0.50 CEMT P 20:30 - 00:00 3.50 CEMT P 12/20/2007 100:00 - 02:00 I 2.001 CEMT I P 02:00 - 02:30 0.50 CEMT P 02:30 - 03:00 0.50 CEMT P Spud Date: 11/24/2007 Start: 11/22/2007 End: 12/25/2007 Rig Release: 12/25/2007 Rig Number: Phase Description of Operations RUNPRD and fill on the fly. Went in hole good. Loss rate ~ 15 bph RUNPRD Circulate and condition mud 1-1/2 open hole volumes. Stage pump up from 1 bpm, 575 psi, 1.5 bpm, 740 psi, 3 bpm, 980 psi, to 3.3 bpm, 1,040 psi. PU 180k, SO - 135k. Reciprocate pipe 30 ft strokes. Lost 50 bbls. No losses at end of circulation. RUNPRD Make up Baker rotating cement head. Rig up lines. RUNPRD Continue circulate and condition mud. Stage pump up from 3 bpm, 1,010 psi to 5 bpm, 1,200 psi ICP, 1,095 psi FCP. No losses after 1st bottoms up. Pumped total of 3.5 bottoms up. PU 180k, SO - 135k. Reciprocate pipe 30 ft strokes. Held cementing PJSM while circulating. *Lost 216 bbls from noon to midnight. *Lost total of 2,954 bbls in roduction section. RUNPRD Cement 4.5" liner. (Cement batched up from 23:25 hr to 00:15 hr) Switch over to Dowell. Pump 5 bbls of fresh water. Test lines to 4,200 psi. Pump 35.5 bbls of 13 ppg MudPush II spacer w/ 2 ppb Cemnet 4.2 bpm, 910 psi ICP, 475 psi FCP. Pump 100 bbls of batched mixed 15.8 bbls of class "G" cement w/ 2 ppb Cemnet C~ 4.8 bpm, 515 psi, ICP, 200 psi FCP. Wash up lines to Tee. Drop wiper dart. Switch to rig and displace cement @ 5 bpm with 90 bbls of 8.5 ppg pert pill, followed by 64 bbls of 8.5 mud. 120 psi ICP, 2,000 psi FCP. Slow to 2 bpm, 1,755 psi ICP, 2,105 psi FCP. Stopped reciprocating with 124 bbls away. PU - 175k, SO - Bump plug C~ 95.6% efc and set liner hanger with 4,200 psi. Bleed off and check floats - OK. CIP ~ 02:00 hr. Good returns through out cement job. RUNPRD Release from liner and set packer. RUNPRD Pick up to circulating position and circulate bottoms up C~? 14 bpm, 3,340 psi ICP, 2,375 psi FCP. 03:00 - 04:30 I 1.501 CEMT I P 04:30 - 06:00 I 1.501 CEMT I P 06:00 - 12:00 6.00 CEMT P 12:00 - 12:30 0.50 CEMT P 12:30 - 13:30 1.00 BOPSU P RUNPRD Laydown cementing head and single. Prep pits for brine displacement. RUNPRD Displace from 8.5 ppg mud to 8.8 ppg brine @ 5 bpm, 520 psi. PU - 170k, SO - 145k. RUNPRD Monitor well - OK. POH from 9,500' to running tool. (Dogs out) RUNPRD Break out and laydown running tool. RUNPRD Ria uo to test BOPS. Fill up BOP stack and_~hoke line. ChnkP 13:30 - 16:00 2.50 BOPSU N MISC RUNPRD Thaw out frozen lines. 16:00 - 22:00 6.00 BOPSU P RUNPRD Test BOPE to 250 psi low, 3,500 psi high for 5 minutes each test. Used 4" and 4.5" test joints. Perform accumulator drawdown test. Test was witnessed by AOGCC rep Chuck Sheve, BP WSL's B. Neufeld and R. French, NAD TP's M. Ashley and G. Hoffman. 22:00 - 23:00 1.00 BOPSU P RUNPRD Rig down BOPE test equipment. Blow down lines. Printed: 1/74/2008 8:57:30 AM i • BP EXPLORATION Page 19 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABORS 9ES Rig Number: i f O i ~ D ~ ' ~ ~ escript on o perat ons Date From - To Hours Task ~~ Code NPT Phase 12/20/2007 23:00 - 00:00 1.00 BOPSU P RUNPRD Test 4.5" liner, liner tog packer and 7" casino to 3.500 osi for 30 minutes -Good test! 12/21/2007 00:00 - 02:00 2.00 CEMT P RUNPRD Slip and cut drilling line 96'. Service drawworks. 02:00 - 03:00 1.00 CEMT P RUNPRD Service topdrive. Change out tube oil filter. 03:00 - 05:30 2.50 PERFO P OTHCMP PJSM. Load floor with subs and tools for pert run. Rig up to pick up perforating guns. 05:30 - 10:30 5.00 PERFO P OTHCMP Pick up 2.88" Power Jet Omega 2906, 4 SPF pert guns. Total of 24 guns, Total loaded - 130 ft, Total blank 932' (incl 17 jts of PH6 tubing) Total gun length - 1062'. Make up bumper sub, MWD, XO's and 1 jt of 2 3/8" PH6 tubing to 1,143'. 10:30 - 11:00 0.50 PERFO P OTHCMP Shallow hole test MWD @ 98 gpm, 295 psi. OK 11:00 - 14:00 3.00 PERFO P OTHCMP Continue running pert guns in hole on 2 3/8" PH6 tubing from 1,143' to 3,942'. 14:00 - 16:30 2.50 PERFO P OTHCMP Rig down 2 3/8" equipment. Change over to 4" elevators. 16:30 - 00:00 7.50 PERFO P OTHCMP Run in hole with DPC pert assembly from 3,942' to top of landing collar C~ 13,388'. Drill pipe measurement was right on. No indication of liner top ~ 9,545'. PU - 180k, SO - 143k. Stand back 1 stand. 12/22/2007 00:00 - 04:30 4.50 PERFO P OTHCMP Make up topdrive, fill pipe and activate slim pulse MWD tool. 142 gpm, 1,730 psi. Log up from 12,169' to 12,079' (Gamma sensor depths). Logs show that no correction necessary. Run back in hole and make confirmation pass from 12, 169' to 12,079'. No adjustment. PU - 183k, SO - 143k, 04:30 - 05:30 1.00 PERFO P OTHCMP Pick up string to set guns on depth for top shot ~ 12,070' and bottom shot ~ 13,120'. PJSM. Initiate gun firing sequence -fire uns. Good indication of both firing heads going off. Lost appx 2 bbls on 1st fire and 4 bbls more on 2nd firing. Did not appear to drop any more. 05:30 - 06:30 1.00 PERFO P OTHCMP POH 12 stands from 13,120' to 12,010'. PU - 183k, SO - 143k. `Lost 10 bbls to perfs 06:30 - 11:30 5.00 PERFO P OTHCMP Circulate 3 complete circulations ~ 150 gpm, 1,650 psi. Attempted to start trip out of hole several times but drill pipe was back flowing. Circulated until well was balanced. Loss rate ~ 2-3 bph. Monitor well - OK. MW - 8.8 ppg. 'Lost total of 26 bbls of brine from time of perforation to noon. 11:30 - 21:30 10.00 PERFO P OTHCMP POH laying down drill pipe from 12,010' to 3,942'. 4 bph loss rate. 21:30 - 22:00 0.50 PERFO P OTHCMP PJSM. Rig up to lay down 2 3/8" PH6 tubing. 22:00 - 00:00 2.00 PERFO P OTHCMP Continue POH with pert assembly, laying down 2 3/8" PH6 tubing from 3,942' to 2,324'. 'Lost 53 bbls of brine from noon to midnight. "Lost total of 79 bbls of brine to erfs for the da . 12/23/2007 00:00 - 02:30 2.50 PERFO P OTHCMP Continue POH with pert assembly, laying down 2 3/8" PH6 tubing from 3,936'to 1,113' 02:30 - 03:30 1.00 PERFO P OTHCMP PJSM, Pull slimpulse tool out of drill collar. Lay down MWD and bumper sub and x-overs. Change elevators. 04:00 - 06:00 2.00 PERFO P OTHCMP Laydown pert gun assembly from 1,074' to 933'. 06:00 - 09:00 3.00 PERFO N RREP OTHCMP Pipe Skate malfunction. Trouble shoot and repair electrical Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Page 20 of 21 Operations Summary Report Legal Well Name: W-45 Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ', Task Code NPT Phase Description of Operations i - - - -- 12/23/2007 06:00 - 09:00 3.00 PERFO N RREP OTHCMP problem with wiring in skate control panel. 09:00 - 10:00 1.00 PERFO P OTHCMP Laydown 17 jts of 2 3/8" PH6 tubing from 933' to 393'. 10:00 - 12:00 2.00 PERFO P OTHCMP Laydown remainder of pert guns. All auns fired. *Lost 11 bbls of brine from midnight to noon. 12:00 - 13:00 1.00 PERFO P OTHCMP Clear and clean rig floor. 13:00 - 15:30 2.50 PERFO P OTHCMP Run in hole with 16 excess stands of 4" drill pipe and POH laying down 48 singles to pipeshed. 15:30 - 19:00 3.50 BUNCO P RUNCMP Pull wear bushing and make hanger dummy run. Rig up to run tubing. 19:00 - 00:00 5.00 BUNCO P RUNCMP PJSM. Run in hole with 4.5" 12.6# 13Cr80 Vam Top tubing from surface to 2,722'. Baker Lok'd all connections below packer. Used Jet Lube Seal Guard pipe dope on remaining connections using 4,440 ft/Ibs make up torque. *Lost 8 bbls of brine from noon to midnight. *Lost total of 98 bbls of brine to erforations. Ran in hole with: W LEG XN nipple X nipple Baker S-3 Packer X nipple 1 jt tubing GLM #1 19 jts tubing GLM #2 28 jts tubing GLM #3 12 jts tubing to 2,722' ~ end of tour. 12/24/2007 00:00 - 12:00 12.00 BUNCO P RUNCMP Continue running in hole with 4.5" 12.6# 13Cr80 Vam Top tubing from 2,722' to 9,505. Ran: 3 jts tubing GLM #4 17 jts tubing GLM #5 w/ Shear valve 29 jts tubing GLM #6 24 jts tubing GLM #7 27 jts tubing GLM #8 5 jts tbg X nipple 48 jts tbg ~ end of tour. *Lost 6 bbls of brine from midnight to noon. 12:00 - 13:30 1.50 BUNCO P RUNCMP Continue running in hole with 4.5" 12.6# 13Cr80 Vam Top tubing from 9,505' to tag up at bottom of liner top seal bore ~ 9,555'. Ran: 6 jts tubing (2 extra for tag up and space out) 13:30 - 15:00 1.50 BUNCO P RUNCMP Space out completion for 5 ft stand off of tag up. Land tubing ~ 9,550'. Run in lock down screws on tubing head. PU - 145k, SO - 110k with 33k blocks. *Ran total of 218 jts of tubing with 2 space out pups under top Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Page 21 of 21 Operations Summary Report .Legal Well Name: W-45 (Common Well Name: W-45 Spud Date: 11/24/2007 Event Name: DRILL+COMPLETE Start: 11/22/2007 End: 12/25/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/25/2007 Rig Name: NABOBS 9ES Rig Number: Date ~I From - To Hours Task ' Code ~ NPT .Phase ~'~~ Description of Operations 12/24/2007 13:30 - 15:00 1.50 BUNCO P RUNCMP tubing joint. 15:00 - 17:00 2.00 BUNCO P RUNCMP Reverse circulate 146 bbls of clean 8.8 ppg brine, followed by 66 bbls of 8.8 ppg inhibited brine, followed by 110 bbls of 8.8 ppg clean brine @ 124 gpm, 260 psi. Placed inhibited brine between GLM #5 and the packer. 17:00 - 19:00 2.00 BUNCO RUNCMP Pressure up on tubing to 3,500 psi to set packer. Hold ressure for 30 minute test -Good test. Bleed tubing pressure down to 1,500 psi. 19:00 - 19:30 ~ 0.50 19:30 - 20:30 I 1.00 20:00 - 00:00 3.00 BOPSO~P 12/25/2007 00:00 - 01:30 1.50 BOPSUF~ P 01:30 - 05:00 3.50 WHSUR P 05:00 - 08:00 3.00 WHSUR P 08:00 - 10:00 2.00 WHSUR P 10:00 - 12:00 2.00 WHSUR P 12:00 - 14:00 2.00 WHSUR P 14:00 - 15:30 1.501 WHSUR I P 15:30 - 16:30 1.00 WHSUR P 16:30 - 18:00 1.50 WHSUR P test -Good test. (Tubing pressure ~ 2,200 psi) Bleed tubing annulus pressure to 0 psi, bleed tubing pressure to 0 psi. RUNCMP Pressure up on annulus and shear out DCK-2 shear valve 2,300 psi. Pump several bbls. C~ 2 bpm, 1,000 psi to confirm circulation - OK. Pump several bbls down tubing @ 2 bpm, 500 psi to confirm circulation - OK. RUNCMP Install 2-way check valve in tubing hanger with T-bar. Pressure test valve from below to 1,000 psi - 5 min - OK. RUNCMP Blown down and rig down circulating equipment. RUNCMP Clean out from under rotary and steam tables. Nipple down ROPE 'Lost 1 bbl from noon to packer set. 'Lost total of 7 bbls of brine for the day. RUNCMP Continue nipple down BOPE. RUNCMP PJSM. Clean top of tubing hanger and tubing spool. Nipple up tree adaptor flange. Test same to 5,000 psi - 10 min - OK. RUNCMP Nipple up tree. Test same to 250 psi low, 5,000 psi high - OK. RUNCMP PJSM. Rig up DSM lubricator. Test same to 500 psi - OK. Pull 2-way check valve. RUNCMP PJSM. Rig up LRHOS for freeze protection. Test lines to 3,500 psi - OK. RUNCMP Reverse circulate 84 bbls of 80 deg diesel ~ 2 bpm, 800 psi ICP, 1,100 psi FCP. Shut down and U-tube diesel back to tubing. SIP - 0 psi. Freeze protected well to 2,400' TVD, 2,472' MD. RUNCMP Rig up DSM lubricator. Set BPV. Test from below to 1,000 psi - OK. RUNCMP Secure tree. Install 3 VR plugs, 1 OA, 2 IA. RUNCMP Finish clean out and emptying of mud pits. "Release rig from W-45 operations (~ 18:00 hr, 12/25/2007. Merry Christmas! Printed: 1/14/2008 8:57:30 AM BP EXPLORATION Leak-Off Test Summary Page 1 of 1 Legal Name: W-45 Common Name: W-45 _ _- - _ _ - Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 11/29/2007 LOT, 3,329.0 (ft) 3,374.0 (ft) 8.80 (ppg) 950 (psi) 2,492 (psi) 14.22 (ppg) 12/8/2007 LOT (ft) (ft) (ppg) (psi) (psi) 14.22 (ppg) 12/9/2007 FIT (ft) (ft) (ppg) (psi) (psi) 14.22 (ppg) 12/10/2007 LOT 9,715.0 (ft) 8,620.0 (ft) 8.40 (ppg) 1,050 (psi) 4,811 (psi) 10.74 (ppg) • Printed: 1/14/2008 8:57:23 AM by 4 ~''~~ Schlumberger ~~~>~~ W-45 Survey Report Report Date: 19-Dec•07 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 146.030° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 tt, E 0.000 ft Structure /Slot: W-PAD / W-Spare TVD Reference Datum: Rotary Table Welf: W-45 TVD Reference Elevation: 79.70 ft relative to MSL Borehole: W-45 Sea Bed /Ground Level Elevation: 51.20 ft relative to MSL UWVAPI~: 500292336900 Magnetic Declination: 23.275° Survey Name /Date: W-45 /December 19, 2007 Total Field Strength: 57644.614 nT Tort /AHD / DDI / ERD ratio: 344.783° / 7723.15 ft / 6.600 / 0.856 Magnetic Dip: 60.868° Grid Coordinate System: NAD27 Alaska Siate Planes, Zone 04, US Feet Declination Date: December 10, 2007 Location LatlLong: N 7017 46.266, W 149 5 41.170 Magnetic Declination Model: BGGM 2007 Location Grid N/E YIX: N 5958722.520 ftUS, E 611789.750 ftUS North Reference: True North Grid Convergence Angle: +0.85223572° Total Corr Mag North -> True North: +23.275° Grid Scale Factor: 0.99991420 Lowl Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft tt ft ft ft de OOTt ftUS ftUS H I t 0.00 O.OU 0.00 -79.70 0.00 0.00 U.OU U.UU U.UU UAO U.UU S9Sti/2"L.52 GYD CT DMS 100.00 0.10 85:04 20.30 100.00 0.04 0.09 0.09 0.01 0.09 0.10 5958722.53 200.00 0.13 38.75 120.30 200.00 0.05 0.28 0.27 0.10 0.24 0.09 5958722.63 300.00 0.06 240.93 220.30 300.00 0.01 0.35 0.32 0.17 0.27 0.19 5958722.69 400.00 0.46 223.22 320.30 400.00 0.10 0.80 0.16 -0.15 -0.05 0.40 5958722.37 500.00 0.79 227.41 420.29 499.99 0.29 1.89 1.23 -0.91 -0.83 0.33 5958721.60 600.00 1.04 228.11 520.28 599.98 0.52 3.48 2.83 -1.98 -2.02 0.25 5958720.51 700.00 0.92 227.81 620.26 699.96 0.76 5.19 4.54 -3.13 -3.29 0.12 5958719.34 800.00 1.44 74.09 720.26 799.96 1.26 6.39 4.26 -3.32 -2.67 2.30 5958719.16 900.00 2.49 77.67 820.20 899.90 2.45 9.81 2.60 -2.51 0.66 1.06 5958720.02 • 1000.00 4.00 86.12 920.03 999.73 5.00 15.46 6.52 -1.81 6.26 1.58 5958720.80 1100.00 6.45 101.30 1019.61 1099.31 10.74 24.52 15.48 -2.68 15.25 2.79 5958720.07 1200.00 7.80 105.00 1118.84 1198.54 19.85 36.92 27.87 -5.54 27.31 1.43 5958717.39 1300.00 9.49 113.94 1217.71 1297.41 31.96 51.92 42.75 -10.64 41.40 2.15 5958712.50 MWD+IFR+MS 1325.28 10.07 116.42 1242.62 1322.32 35.64 56.21 46.97 -12.47 45.29 2.84 5958710.73 1420.05 11.46 121.66 1335.72 1415.42 51.42 73.90 64.28 -21.10 60.72 1.79 5958702.33 1515.83 12.61 129.20 1429.40 1509.10 70.10 93.84 83.59 -32.70 76.92 2.03 5958690.97 1610.93 13.31 138.07 1522.09 1601.79 90.88 115.13 103.75 -47.41 92.29 2.21 5958676.50 1707.32 13.32 146.29 1615.89 1695.59 112.97 137.30 124.17 -64.90 105.86 1.96 5958659.21 1803.66 14.41 156.53 1709.44 1789.14 135.86 160.32 144.53 -85.13 116.80 2.78 5958639.14 1898.32 18.54 .167.67 1800.22 1879.92 161.45 187.09 166.72 -110.65 124.71 5.47 5958613.74 1993.99 20.92 168.55 1890.26 1969.96 191.37 219.38 193.62 -142.26 131.35 2.51 5958582.24 2089.32 21.79 171.72 1979.05 2058.75 223.04 254.09 223.56 -176.45 137.28 1.52 5958548.15 2185.74 23.90 176.51 2067.91 2147.61 256.01 291.50 256.02 -213.66 141.04 2.92 5958511.00 2281.70 28.23 178.54 2154.09 2233.79 291.91 333.65 292.94 -255.77 142.81 4.61 5958468.92 6117S9.7b N /U 1 / 46."L(iti W 149 5 41.1 /U 611789.84 N 70.17 46.266 W 149 5 41.167 611789.99 N 70 17 46.267 W 149 5 41.163 611790.02 N 70 17 46.268 W 149 5 41.162 611789.70 N 70 17 46.264 W 149 5 41.171 611788.93 N 70 17 46.257 W 149 5 41.194 611787.76 N 7017 46.246 W 149 5 41.229 611786.51 N 70 17 46.235 W 149 5 41.266 611787.13 N 70 17 46.233 W i49 5 41.248 611790.45 N 70 17 46.241 W 149 5 41.151 611796.04 N 70 17 46.248 W 149 5 40.987 611805.04 N 70 17 46.240 W 149 5 40.725 611817.14 N 7017 46.211 W 149 5 40.374 611831.30 N 7017 46.161 W 149 5 39.963 611835.21 N 70 17 46.143 W 149 5 39.850 611850.77 N 70 17 46.058 W 149 5 39.400 611867.15 N 70 17 45.944 W 149 5 38.928 611882.72 N 70 17 45.800 W 149 5 38.480 611896.56 N 7017 45.628 W 149 5 38.084 611907.79 N 70 17 45.429 W 149 5 37.765 611916.08 N 70 17 45.178 W 149 5 37.535 611923.19 N 7017 44.867 W 149 5 37.341 611929.62 N 70 17 44.531 W 149 5 37.169 611933.94 N 70 17 44.165 W 149 5 37.059 611936.33 N 7017 43.750 W 149 5 37.008 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/1 8/2008 1 2:36 PM Page 1 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Seetion Departure ft de de ft ft ft ft ft tt ft de 00 ft ftUS ftUS 2376.65 29.13 2472.02 30.53 2568.48 31.64 2664.88 34.23 2760.18 34.53 2854.97 33.80 2951.40 33.48 3047.40 33.21 3142.66 32.93 3238.52 32.41 3333.41 31.96 3429.00 31.62 3525.53 31.41 3581.32 31.24 3711.91 30.54 3806.56 30.28 3902.76 29.22 3998.87 28.67 4093.25 27.84 4188.76 27.10 4287.45 26.53 4388.34 27.56 4485.43 27.42 4579.98 28.36 4675.25 29.81 4770.14 30.93 4865.20 32.15 4960.14 32.67 • 5055.83 33.27 5151.21 34.02 5246.77 33.00 5341.78 32.86 5437.45 32.56 5533.41 31.26 5628.69 31.44 5724.82 31.04 5820.83 29.86 5917.30 29.29 6011.96 28.77 6108.08 28.64 6203.01 28.16 6298.43 27.77 178.07 2237.39 2317.09 330.44 379.22 334. 03 -301.32 144.16 0.98 5958423.40 176.59 2320.12 2399.82 370.98 426.65 378. 18 -348.70 146.38 1.66 5958376.06 175.05 2402.73 2482.43 414.20 476.45 425. 68 -398.37 150.02 1.42 5958326.46 175.33 2483.63 2563.33 459.97 528.86 476. 31 -450.59 154.41 2.69 5958274.31 174.10 2562.29 2641.99 507.18 582.67 528. 76 -504.17 159.37 0.79 5958220.82 174.55 2640.72 2720.42 554.05 635.91 580. 96 -557.14 164.63 0.81 5958167.93 173.61 2721.00 2800.70 601.19 689.32 633. 55 -610.28 170.14 0.63 5958114.89 173.95 2801.19 2880.89 647.89 742.09 685. 67 -662.74 175.86 0.34 5958062.53 173.75 2881.02 2960.72 693.86 794.07 737. 09 -714.42 181.43 0.32 5958010.94 173.03 2961.72 3041.42 739.82 845.82 788. 41 -765.82 187.38 0.68 5957959.64 173.88 3042.03 3121.73 784.68 896.36 838 .58 -816.03 193.14 0.67 5957909.52 173.22 3123.28 3202.98 829.34 946.72 888 .59 -866.07 198.80 0.51 5957859.58 173.79 3205.57 3285.27 874.11 997.18 938 .75 -916.20 204.51 0.38 5957809.54 173.83 3253.23 3332.93 899.77 1026.18 967 .58 -945.04 207.64 0.31 5957780.76 173.25 3365.29 3444.99 959.23 1093.22 1034. 29 -1011.65 215.18 0.58 5957714.27 172.92 3446.92 3526.62 1001.89 1141.13 1082 .01 -1059.22 220.94 0.33 5957666.80 172.59 3530.44 3610.14 1044.53 1188.87 1129 .61 -1106.57 226.96 1.11 5957619.54 173.85 3614.55 3694.25 1085.90 1235.38 1175 .96 -1152.76 232.46 0.85 5957573.45 174.09 3697.68 3777.38 1125.37 1280.06 1220 .45 -1197.19 237.15 0.89 5957529.10 174.09 3782.42 3862.12 1164.25 1324.12 1264 .33 -1241.01 241.69 0.77 5957485.35 174.15 3870.50 3950.20 1203.53 1368.64 1308 .67 -1285.30 246.25 0.58 5957441.14 175.38 3960.35 4040.05 1243.75 1414.51 1354 .33 -1330.98 250.43 1.16 5957395.53 175.67 4046.48 4126.18 1282.75 1459.32 1398 .90 -1375.66 253.92 0.20 5957350.91 175.58 4130.05 4209.75 1321.21 1503.55 1442. 88 -1419.76 257.30 1.00 5957306.87 176.60 4213.30 4293.00 1361.29 1549.86 1488. 91 -1465.96 260.45 1.61 5957260.73 176.65 4295.17 4374.87 1402.58 1597.84 1536 .57 -1513.85 263.27 1.18 5957212.89 175.93 4376.19 4455.89 1445.53 1647.56 1586 .02 -1563.47 266.49 1.34 5957163.33 175.90 4456.34 4536.04 1489.65 1698.44 1636 .67 -1614.22 270.12 0.55 5957112.64 176.33 4536.62 4616.32 1534.71 1750.52 1688 .50 -1666.18 273.64 0.67 5957060.74 175.72 4616.02 4695.72 1580.48 1803.36 1741 .12 -1718.89 277.31 0.86 5957008.09 174.93 4695.70 4775.40 1626.49 1856.12 1793 .72 -1771.47 281.60 1.16 5956955.59 174.40 4775.44 4855.14 1671.82 1907.77 1845 .26 -1822.90 286.41 0.34 5956904.24 173.80 4855.94 4935.64 1717.43 1959.47 1896 .89 -1874.32 291.72 0.46 5956852.91 173.93 4937.40 5017.10 1762.29 2010.19 1947 .56 -1924.75 297.14 1.36 5956802,57 173.85 5018.77 5098.47 1806.11 2059.76 1997 .07 -1974.04 302.42 0,19 5956753.37 174.15 5100.96 5180.66 1850.14 2109.61 2046 .87 -2023.62 307.63 0.45 5956703.87 173.35 5183.72 5263.42 1893.21 2158.27 2095 .49 -2071.99 312.92 1.30 5956655.59 174.11 5267.63 5347.33 1935.37 2205.88 2143 .06 -2119.32 318.12 0.71 5956608.35 174.48 5350.39 5430.09 1975.83 2251.82 2188 .94 -2165.03 322.69 0.58 5956562.72 173.25 5434.70 5514.40 2016.65 2297.98 2235 .07 -2210.93 327.62 0.63 5956516.90 172.94 5518.21 5597.91 2056.86 2343.13 2280. 20 -2255.75 333.05 0.53 5956472.17 172.46 5602.48 5682.18 2096.84 2387.88 2324. 94 -2300.13 338.73 0.47 5956427.88 611938.36 N 7017 43.302 W 149 5 36.968 611941.29 N 7017 42.836 W 149 5 36.903 611945.66 N 70 17 42.348 W 149 5 36.797 611950.83 N 70 17 41.834 W 149 5 36.669 611956.58 N 70 17 41.307 W 149 5 36.525 6i 1962.64 N 70 17 40.786 W 149 5 36.371 611968.93 N 70 17 40.264 W 149 5 36.211 611975.43 N 70 17 39.748 W 149 5 36.044 611981.77 N 7017 39.240 W 149 5 35.882 611988.48 N 7017 38.734 W 149 5 35.709 611994.99 N 70 17 38.240 W 149 5 35.541 612001.39 N 70 17 37.748 W 149 5 35.376 612007.84 N 70 17 37.255 W 149 5 35.210 612011.40 N 70 17 36.972 W 149 5 35.118 612019.93 N 70 17 36.316 W 149 5 34.899 612026.40 N 7017 35.849 W 149 5 34.731 612033.12 N 70 17 35.383 W 149 5 34.555 612039.30 N 701734.929 W 149 5 34.395 612044.66 N 70 17 34.492 W 149 5 34.259 612049.85 N 70 17 34.061 W 149 5 34.126 612055.07 N 70 17 33.625 W 149 5 33.993 612059.92 N 70 17 33.176 W 149 5 33.872 612064.08 N 70 17 32.736 W 149 5 33.770 612068.11 N 70 17 32.303 W 149 5 33.672 612071.95 N 70 17 31.848 W 149 5 33.580 612075.48 N 70 17 31.377 W 149 5 33.498 612079.44 N 70 17 30.889 W 149 5 33.404 612083.82 N 70 17 30.390 W 149 5 33.298 612088.12 N 7017 29.879 W 149 5 33.196 612092.57 N 7017 29.361 W 149 5 33.089 612097.64 N 70 17 28.844 W 149 5 32.964 612103.21 N 70 17 28.338 W 149 5 32.824 612109.29 N 70 17 27.832 W 149 5 32.669 612115.46 N 70 17 27.336 W 149 5 32.511 612121.47 N 70 17 26:851 W 149 5 32.357 612127.41 N 7017 26.364 W 149 5 32.206 612133.42 N 7017 25.888 W 149 5 32.051 612139.33 N 70 17 25.423 W 149 5 31.900 612144.58 N 70 17 24.973 W 149 5 31.767 612150.19 N 7017 24.522 W 149 5 31.623 612156.28 N 70 17 24.081 W 149 5 31.465 612162.63 N 70 17 23.644 W 149 5 31.300 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/1 8/2008 1 2:36 PM Page 2 of 6 Comments Measured Inclination Azimuth SulrSea ND 7Vp Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS fIUS bJy4.Z4 Z/.l5 l /Z.4i5 DbC/AV b/U/.ZV L13b.4V Z4:iZ.V6 ZJby.l "C -Z:S4;i.y3 344.bZ U.bS bybbitl4.lt5 Ol"L1liy.U/ N /U 1 / "L:i.'L1 J W 14y 5 J1.731 6490.42 26.09 173.48 5773.48 5853.18 2174.82 2475.15 2412.20 -2386.70 349.80 1.20 5956341.49 612174.97 N 70 17 22.793 W 149 5 30.877 6585.74 28.51 178.88 5858.19 5937.89 2212.54 2518.84 2455.73 -2430.28 352.62 3.63 5956297.96 612178.45 N 70 1722.364 W 149 5 30.895 6679.94 30.78 180.54 5940.06 6019.76 2251.29 2565.43 2501.87 -2476.87 352.84 2.56 5956251.39 612179.35 N 70 17 21.906 W 149 5 30.889 6777.59 30.29 180.23 6024.17 6103.87 2292.25 2615.04 2550.95 -2526.48 352.50 0.53 5956201.78 612179.76 N 7017 21.418 W 149 5 30.899 6872.97 29.05 178.51 6107.04 6186.74 2331.68 2662.25 2597.78 -2573.69 353.01 1.58 5956154.59 612180.96 N 70 17 20.954 W 149 5 30.884 6968.88 28.95 176.44 6190.93 6270.63 2371.34 2708.75 2644.08 -2620.13 355.05 1.05 5956108.19 612183.70 N 70 17 20.497 W 149 5 30.824 7063.25 27.35 176.28 6274.13 6353.83 2409.77 2753.27 2688.49 -2664.56 357.88 1.70 5956063.81 612187.19 N 7017 20.060 W 149 5 30.742 7160.23 29.47 172.53 6359.43 6439.13 2450.37 2799.39 2734.58 -2710.46 362.43 2.86 5956017.99 612192.42 N 7017 19.609 W 149 5 30.610 7255.97 29.10 170.86 6442.94 6522.64 2492.58 2846.22 2781.40 -2756.79 369.19 0.94 5955971.76 612199.86 N 70 17 19.153 W 149 5 30.413 • 7352.16 7447.45 26.29 24.30 172.14 173.45 6528.10 6614.25 6607.80 6693.95 2532.94 2569.30 2890.92 2931.63 2826.10 2866.81 -2801.00 -2841.38 375.82 380.94 2.99 2.17 5955927.67 5955887.36 612207.15 612212.87 N 70 17 18.718 N 7017 18.321 W 149 W 149 5 30.220 5 30,071 7542.88 24.02 172.14 6701.32 6781.02 2604.17 2970.69 2905.86 -2880.13 385.84 0.63 5955848.70 612218.34 N 7017 17.940 W 149 5 29,928 7638.70 25.91 171.40 6788.19 6867.89 2640.60 3011.13 2946.30 -2920.15 391.63 2.00 5955808.77 612224.74 N 7017 17.546 W 149 5 29,759 7733.84 26.12 170.78 6873.69 6953.39 2678.40 3052.86 2988.02 -2961.38 398.10 0.36 5955767.65 612231.81 N 7017 17.141 W 149 5 29.571 7820.65 25.68 170.33 6951.78 7031.48 2712.90 3090.78 3025.92 -2998.78 404.32 0.56 5955730.34 612238.59 N 70 17 16.773 W 149 5 29.390 7910.83 28.08 172.48 7032.21 7111.91 2749.72 3131.54 3066.68 -3039.09 410.38 2.87 5955690.13 612245.25 N 70 17 16.377 W 149 5 29.213 8007.69 33.99 175.57 7115.17 7194.87 2793.72 3181.45 3116.55 -3088.73 415.46 6.32 5955640.58 612251.06 N 70 17 15.888 W 149 5 29.065 8103.17 33.64 175.69 7194.50 7274.20 2839.92 3234.59 3169.60 -3141.72 419.51 0.37 5955587.67 612255.90 N 70 17 15.367 W 149 5 28.947 8199.11 34.52 175.69 7273.96 7353.66 2886.64 3288.34 3223.27 -3195.32 423.55 0.92 5955534.13 612260.74 N 7017 14.840 W 149 5 28.830 8294.24 36.87 173.46 7351.22 7430.92 2935.40 3343.84 3278.73 -3250.57 428.83 2.82 5955478.98 612266.83 N 70 17 14.297 W 149 5 28.676 8390.76 36.65 170.64 7428.55 7508.25 2987.30 3401.60 3336.48 -3307.76 436.81 1.76 5955421.91 612275.67 N 7017 13.734 W 149 5 28.443 8486.71 36.71 172.59 7505.51 7585.21 3038.99 3458.91 3393.78 -3364.46 445.17 1.22 5955365.35 612284.86 N 7017 13.177 W 149 5 28.200 8582.90 35.79 171.57 7583.08 7662.78 3090.08 3515.79 3450.66 -3420.79 453.00 1.14 5955309.14 612293.53 N 7017 12.623 W 149 5 27.972 8678.62 34.67 172.49 7661.27 7740.97 3139.71 3571.00 3505.87 -3475.47 460.66 1.29 5955254.59 612302.01 N 70 17 12.085 W 149 5 27.749 8773.80 33.42 172.48 7740.13 7819.83 3187.42 3624.29 3559.15 -3528.30 467.63 1.31 5955201.88 612309.76 N 70 17 11.565 W 149 5 27.546 8871.23 31.75 172.93 7822.22 7901.92 3234.30 3676.76 3611.62 -3580.34 474.29 1.73 5955149.94 612317.20 N 70 17 11.053 W 149 5 27.352 8966.49 31.66 174.14 7903.27 7982.97 3278.71 3726.82 3661.67 -3630.09 479.93 0.67 5955100.29 612323.58 N 70 17 10.564 W 149 5 27.188 • 9062.34 32.38 173.76 7984.53 8064.23 3323.61 3777.64 3712.48 -3680.62 485.29 0.78 5955049.84 612329.68 N 7017 10.067 W 149 5 27.032 9156.61 32.21 174.24 8064.22 8143.92 3368.10 3828.00 3762.83 -3730.71 490.56 0.33 5954999.84 612335.69 N 7017 9.574 W 149 5 26.878 9252.49 33.83 174.09 8144.61 8224.31 3414.17 3880.25 3815.05 -3782.69 495.87 1.69 5954947.96 612341.78 N 70 17 9.063 W 149 5 26.724 9347.55 31.65 175.03 8224.56 8304.26 3459.34 3931.66 3866.43 -3833.86 500.75 2.35 5954896.87 612347.42 N 70 17 8.560 W 149 5 26.581 9443.06 30.80 173.56 8306.24 8385.94 3502.94 3981.17 3915.91 -3883.13 505.67 1.20 5954847.68 612353.07 N 70 17 8.075 W 149 5 26.438 9539.28 35.99 167.31 8386.57 8466.27 3551.18 4034.07 3968.75 -3935.24 514.65 6.47 5954795.72 612362.82 N 70 17 7.563 W 149 5 26.177 9634.16 39.39 163.68 8461.65 8541.35 3605.87 4092.06 4026.29 -3991.35 529.24 4.28 5954739.83 612378.25 N 70 17 7.011 W 149 5 25.752 9743.37 38.21 163.23 8546.76 8626.46 3671.15 4160.49 4093.89 -4056.95 548.72 1.11 5954674.54 612398.70 N 70 17 6.366 W 149 5 25.184 9776.03 40.77 160.37 8571.96 8651.66 3691.14 4181.26 4114.30 -4076.67 555.22 9.61 5954654.92 612405.49 N 70 17 6.172 W 149 5 24.995 9807.79 41.18 156.98 8595.95 8675.65 3711.45 4202.08 4134.54 -4096.06 562.80 7.12 5954635.64 612413.35 N 70 17 5.981 W 149 5 24.775 9838.91 42.34 150.90 8619.17 8698.87 3731.96 4222.79 4154.21 -4114.66 571.90 13.53 5954617.19 612422.73 N 7017 5.798 W 149 5 24.509 9872.18 41.77 143.83 8643.89 8723.59 3754.21 4245.06 4174.44 -4133.40 583.90 14.33 5954598.62 612435.01 N 7017 5.614 W 149 5 24.160 9902.61 42.26 138.43 8666.50 8746.20 3774.49 4265.42 4191.93 -4149.25 596.67 11.98 5954582.97 612448.02 N 70 17 5.458 W 149 5 23.788 9935.17 44.51 136.24 8690.17 8769.87 3796.59 4287.79 4210.37 -4165.68 611.83 8.31 5954566.76 612463.42 N 70 17 5.296 W 149 5 23.346 9967.30 44.97 132.23 8712.99 8792.69 3818.72 4310.40 4228.35 -4181.45 628.03 8.90 5954551.24 612479.85 N 7017 5.141 W 149 5 22.874 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft tt de 00 tt ftUS ttUS 9998.03 44.83 126.94 8734.77 8814.47 3839.51 4332.08 4244.52 -4195.26 644.74 12.16 5954537.68 612496.76 N 70 17 5.006 W 149 5 22.388 10030.56 44.73 123.33 8757.86 8837.56 3860.91 4354.99 4260.42 -4208.45 663.47 7.82 5954524.78 612515.68 N 7017 4.876 W 149 5 21.842 10062.76 43.84 118.73 8780.92 8860.62 3881.28 4377.47 4274.90 -4220.04 682.72 10.35 5954513.48 612535.10 N 70 17 4.762 W 149 5 21.281 10094.94 44.18 118.88 8804.06 8883.76 3901.16 4399.83 4288.70 -4230.81 702.31 1.11 5954503.00 612554.85 N 70 17 4.656 W 149 5 20.711 10126.38 47.82 12i .63 8825.90 8905.60 3921.53 4422.44 4303.19 -4242.21 721.83 13.18 5954491.88 612574.53 N 70 17 4.544 W 149 5 20.142 10158.14 51.76 123.74 8846.40 8926.10 3943.79 4446.68 4319.57 -4255.32 742.23 13.40 5954479.08 612595.12 N 70 17 4.415 W 149 5 19.548 10190.25 56.34 124.76 8865.25 8944.95 3967.93 4472.67 4337.71 -4269.95 763.71 14.49 5954464.78 612616.81 N 70 17 4.271 W 149 5 18.922 10221.78 61.26 124.24 8881.58 8961.28 3993.01 4499.63 4356.69 -4285.22 785.93 15.67 5954449.84 612639.26 N 70 17 4.121 W 149 518.275 10252.97 65.50 123.39 8895.55 8975.25 4018.81 4527.51 4376.17 -4300.73 809.10 13.81 5954434.68 612662.65 N 7017 3.968 W 149 5 17.600 10285.92 70.03 123.38 8908.01 8987.71 4046.96 4558.00 4397.43 -4317.51 834.56 13.75 5954418.28 612688.35 N 70 17 3.803 W 149 5 16.858 • 10317.94 73.89 122.64 8917.93 8997.63 4074.97 4588.44 4418.61 -4334.09 860.08 12.25 5954402.08 612714.12 N 70 17 3.640 W 149 516.115 10348.99 76.64 121.62 8925.83 9005.53 4102.42 4618.47 4439.27 -4350.06 885.51 9.41 5954386.50 612739.78 N 70 17 3.483 W 149 515.374 10381.66 81.23 120.74 8932.09 9011.79 4131.51 4650.52 4461.06 -4366.65 912.94 14.30 5954370.31 612767.45 N 70 17 3.320 W 149 514.575 i 0413.16 85.93 1 i 8.80 8935.62 9015.32 4159.57 4681.82 4481.89 -4382.19 940.10 16.13 5954355.19 612794.84 N 70 17 3.167 W 149 5 13.784 10444.10 90.50 118.72 8936.58 9016.28 4187.05 4712.73 4502.18 -4397.06 967.20 14.77 5954340.72 612822. i 6 N 7017 3.021 W 149 5 12.995 10475.92 94.87 119.04 8935.09 9014.79 4215.32 4744.51 4523.21 -4412.41 995.03 13.77 5954325.79 612850.20 N 70 17 2.870 W 149 5 12.184 10515.96 100.82 118.18 8929.63 9009.33 4250.52 4784.16 4549.48 -4431.39 1029.83 15.01 5954307.32 612885.28 N 7017 2.683 W 149 5 11.170 10547.80 101.10 118.01 8923.57 9003.27 4278.13 4815.42 4570.13 -4446.12 1057.41 1.02 5954293.01 612913.07 N 70 17 2.538 W 149 5 10.367 10578.28 100.79 118.17 8917.79 8997.49 4304.57 4845.34 4590.00 -4460.21 1083.81 1.14 5954279.32 612939.68 N 7017 2.399 W 149 5 9.598 10610.15 100.63 119.61 8911.86 8991.56 4332.44 4876.66 4611.23 -4475.34 1111.23 4.47 5954264.60 612967.32 N 70 17 2.250 W 149 5 8.800 10643.60 99.61 118.05 8905.99 8985.69 4361.72 4909.59 4633.65 -4491.21 1140.07 5.51 5954249.15 612996.39 N 7017 2.094 W 149 5 7.959 10674.97 96.00 118.57 8901.73 8981.43 4389.23 4940.66 4654.73 -4505.95 1167.43 11.62 5954234.83 613023.96 N 7017 1.949 W 149 5 7.162 10705.95 94.76 119.29 8898.82 8978.52 4416.69 4971.50 4675.99 -4520.87 1194.42 4.62 5954220.31 613051.17. N 70 17 1.803 W 149 5 6.376 10737.12 93.45 118.82 8896.59 8976.29 4444.40 5002.59 4697.59 -4535.97 1221.60 4.46 5954205.62 613078.57 N 7017 1.654 W 149 5 5.585 10770.01 92.15 116.09 8894.98 8974.68 4473.24 5035.44 4719.85 -4551.11 1250.75 9.18 5954190.91 613107.94 N 7017 1.505 W 149 5 4.736 10801.20 92.01 113.56 8893.85 8973.55 4499.90 5066.61 4740.02 -4564.20 1279.04 8.12 5954178.25 613136.41 N 70 17 1.376 W 149 5 3.912 10833.00 90.30 112.08 8893.21 8972.91 4526.50 5098.40 4759.87 -4576.53 1308.34 7.11 5954166.36 613165.89 N 70 17 1.255 W 149 5 3.058 10865.24 89.31 111.72 8893.32 8973.02 4553.19 5130.64 4779.72 -4588.55 1338.25 3.27 5954154.78 613195.98 N 70 17 1.137 W 149 5 2.187 10896.47 89.64 111.95 8893.61 8973.31 4579.01 5161.87 4799.05 -4600.17 1367.24 1.29 5954143.60 613225.13 N 7017 1.022 W 149 5 1.342 10927.52 90.33 111.25 8893.61 8973.31 4604.63 5192.92 4818.29 -4611.60 1396.11 3.17 5954132.60 613254.17 N 70 17 0.910 W 149 5 0.502 10960.24 92.66 111.26 8892.76 8972.46 4631.49 5225.63 4838.54 -4623.45 1426.59 7.12 5954121.20 613284.82 N 70 17 0.793 W 149 4 59.614 10992.74 93.49 109.86 8891.02 8970.72 4657.92 5258.08 4858.46 -4634.85 1456.98 5.00 5954110.26 613315.37 N 70 17 0.681 W 149 4 58.729 11025.40 93.39 109.60 8889.06 8968.76 4684.19 5290.68 4878.23 -4645.86 1487.66 0.85 5954099.71 613346.21 N 70 17 0.573 W 149 4 57.835 11057.04 93.32 110.28 8887.21 8966.91 4709.72 5322.27 4897.61 -4656.63 1517.36 2.16 5954089.38 613376.06 N 7017 0.467 W 149 4 56.970 11088.88 93.04 109.36 8885.44 8965.14 4735.37 5354.06 4917.19 -4667.41 1547.26 3.02 5954079.05 613406.12 N 7017 0.361 W 149 4 56,099 11120,19 92.24 109.91 8884.00 8963.70 4760.55 5385.34 4936.49 -4677.92 1576.72 3.10 5954068.98 613435.73 N 7017 0.257 W 149 4 55.241 11151.81 92.00 110.00 8882.83 8962.53 4786.08 5416.93 4956.26 -4688.70 1606.42 0.81 5954058.64 613465.59 N 7017 0.151 W 149 4 54.376 11183.84 91.80 109.78 8881.77 8961.47 4811.94 5448.95 4976.38 -4699.59 1636.52 0.93 5954048.20 613495.84 N 70 17 0.044 W 149 4 53.499 11216.53 91.88 111.42 8880.72 8960.42 4838.56 5481.62 4997.36 -4711.09 1667.11 5.02 5954037.16 613526.59 N 70 16 59.931 W 149 4 52.608 11248.10 91.67 111.16 8879.74 8959.44 4864.49 5513.17 5018.02 -4722.54 1696.51 1.06 5954026.14 613556.16 N 70 16 59.818 W 149 4 51.752 11280.52 90.99 110.64 8878.98 8958.68 4891.00 5545.58 5039.20 -4734.11 1726.79 2.64 5954015.03 613586.60 N 70 16 59.704 W 149 4 50.870 11312.19 90.15 110.78 8878.67 8958.37 4916.84 5577.25 5059.93 -4745.31 1756.41 2.69 5954004.28 613616.39 N 70 16 59.594 W 149 4 50.007 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/1 8/2008 1 2:36 PM Page 4 of 6 Comments Measured Inclination Azimuth Sub-Sea TVD TVp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft it ft tt de 00 tt ftUS ftUS • l 1344.Ub 11376.17 11408.18 11439.97 11472.58 11503.22 11535.75 11567.90 11599.85 11631.82 11663.88 11695.73 11727.82 11760.08 11790.86 11822.26 11855.29 11887.02 11918.46 11950.31 11982.97 12013.58 12045.79 12077.45 12109.46 12141.38 12172.82 12205.01 12236.74 12269.10 12300.85 12332.29 12365.62 yV.V4 91.57 94.83 95.27 94.82 94.79 94.01 93.66 92.29 90.71 90.61 90.31 90.49 91.40 90.26 88.34 85.32 81.41 81.07 80.76 82.01 82.02 83.60 84.53 83.83 84.63 84.13 84.26 83.82 84.05 83.02 82.41 83.13 83.06 83.20 84.10 87.31 87.38 86.18 87.48 89.40 91.05 94.08 12396.92 12428.58 12459.55 12491.91 12524.80 12555.34 12586.98 12618.43 12651.16 12683.56 SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) lll./L Cis/C.b'L C~JSC.:SG 4`J4J.UU bbV`J.ll bVCI.IL -4/bb.CS 1/CU.IU L.`.i/ by5:iyy:i.l/ 112.72 8878.17 8957.87 4969.69 5641.23 5103.00 -4769.00 1815.83 5.69 5953981.47 111.38 8876.38 8956.08 4996.19 5673.18 5124.80 -4781.00 1845.45 11.01 5953969.92 111.53 8873.58 8953.28 5022.26 5704.85 5146.27 -4792.58 1874.92 1.46 5953958.78 112.12 8870.71 8950.41 5049.12 5737.34 5168.56 -4804.65 1905.08 2.27 5953947.15 111.57 8868.15 8947.85 5074.38 5767.87 5189.62 -4816.02 1933.42 1.79 5953936.22 111.77 8865.65 8945.35 5101.16 5800.30 5212.01 -4827.99 1963.56 2.47 5953924.69 113.13 8863.50 8943.20 5127.88 5832.38 5234.58 -4840.24 1993.21 4.36 5953912.88 112.36 8861.84 8941.54 5154.55 5864.29 5257.24 -4852.58 2022.63 4.92 5953900.99 112.75 8861.01 8940.71 5181.21 5896.24 5279.95 -4864.84 2052.14 5.09 5953889.17 114.27 8860,64 8940.34 5208.24 5928.30 5303.21 -4877.62 2081.54 4.75 5953876.82 114.50 8860.38 8940.08 5235.35 5960.15 5326.73 -4890.77 2110.55 1.19 5953864.11 114.91 8860.16 8939.86 5262.76 5992.24 5350.64 -4904.18 2139.70 1.40 5953851.13 115.09 8859.62 8939.32 5290.40 6024.49 5374.87 -4917.82 2168.93 2.88 5953837.94 114.72 8859.18 8938.88 5316.75 6055.27 5398.03 -4930.78 2196.85 3.89 5953825.39 116.87 8859.56 8939.26 5343.87 6086.67 5422.05 -4944.44 2225.11 9.18 5953812.16 115.76 8861.39 8941.09 5372.51 6119.64 5447.55 -4959.06 2254.67 9.74 5953797.98 116.74 8865.05 8944.75 5399.86 6151.15 5471.97 -4972.99 2282.93 12.70 5953784.47 115.98 8869.84 8949.54 5426.86 6182.23 5496.16 -4986.79 2310.77 2.62 5953771.09 116.81 8874.87 8954.57 5454.20 6213.68 5520.72 -5000.77 2338.95 2.75 5953757.53 115.18 8879.76 8959.46 5482.15 6245.97 5545.87 -5014.92 2367.97 6.24 5953743.81 115.84 8884.02 8963.72 5508.26 6276.28 5569.39 -5027.98 2395.33 2.14 5953731.17 115.24 8888.05 8967.75 5535.80 6308.24 5594.27 -5041.75 2424.16 5.24 5953717.82 114.30 114.98 114.88 115.11 114.51 114.95 114.92 114.21 112.29 112.49 112.63 113.21 114.63 113.66 112.72 113.94 113.10 113.09 113.53 113.49 8891.32 8894.57 8897.78 8900.86 8904.11 8907.41 8910.82 8914.40 8918.39 8922.58 8926.34 8930.13 8933.56 8935.98 8937.50 8939.22 8940.97 8941.82 8941.70 8940.25 8971.02 5562.72 6339.73 5618.58 -5054.95 2452. 75 4.17 5953705.05 8974.27 5589.90 6371.57 5643.20 -5068.22 2481. 70 3,04 5953692.21 8977.48 5617.09 6403.33 5667.92 -5081.61 2510. 50 2,53 5953679.26 8980.56 5643.90 6434.62 5692.37 -5094.83 2538. 86 1,75 5953666.46 8983.81 5671.29 6466.64 5717.40 -5108.27 2567. 92 1.90 5953653.46 8987.11 5698.26 6498.20 5742.10 -5121.47 2596. 59 1.96 5953640.68 8990.52 5725.81 6530.38 5767.43 -5135.04 2625. 77 0.72 5953627.55 8994.10 5752.72 6561.93 5792.20 -5148.15 2654. 46 3.93 5953614.87 8998.09 5778.94 6593.12 5816.31 -5160.46 2683. 11 6.36 5953602.99 9002.28 5806.47 6626.18 5841.63 -5173.06 2713. 68 2.24 5953590.85 9006.04 5832.39 6657.25 5865.55 -5184.98 2742. 38 0.50 5953579.36 9009.83 5858.72 6688.69 5889.94 -5197.22 2771. 33 1.87 5953567.55 9013.26 5884.79 6719.46 5914.22 -5209.70 2799. 47 5.40 5953555.49 9015.68 5912.18 6751.73 5939.81 -5222.90 2828. 91 10.36 5953542.73 9017.20 5939.79 6784.58 5965.61 -5235.83 2859. 11 2.86 5953530.25 b1Jb4l)."L4 N /U 16,y.4C1 W l4y 4 4`,l.l 4Z 613676.15 N 7016 59.361 W 149 4 48.276 613705.94 N 7016 59.243 W 149 4 47.414 613735.58 N 7016 59.129 W 149 4 46.555 613765.91 N 7016 59.010 W 149 4 45.677 613794.41 N 70 16 58.898 W 149 4 44.851 613824.72 N 7016 58.780 W 149 4 43.974 613854.55 N 7016 58.660 W 149 4 43.110 613884.15 N 7016 58.538 W 149 4 42.253 613913.84 N 70 16 58.418 W 149 4 41.394 613943.42 N 70 16 58.292 W 149 4 40.537 613972.62 N 7016 58.163 W 149 4 39.693 614001.96 N 7016 58.031 W 149 4 38.843 614031.39 N 7016 57.896 W 149 4 37.992 614059.49 N 70 16 57.769 W 149 4 37.179 614087.96 N 70 16 57.634 W 149 4 36.356 614117.73 N 70 16 57.491 W 149 4 35.495 614146.19 N 7016 57.353 W 149 4 34.672 614174.23 N 70 16 57.218 W 149 4 33.861 614202.61 N 7016 57.080 W 149 4 33.041 614231.83 N 70 16 56.941 W 149 4 32.195 614259.38 N 70 16 56.812 W 149 4 31.399 614288.41 N 70 i 6 56.677 W 149 4 30.559 614317.20 N 7016 56.547 W 149 4 29.726 614346.33 N 7016 56.416 W 149 4 28.883 614375.32 N 7016 56.285 W 149 4 28.044 614403.87 N 70 16 56.154 W 149 4 27.219 614433.14 N 7016 56.022 W 149 4 26.372 614461.99 N 7016 55.892 W 149 4 25.537 614491.37 N 7016 55.759 W 149 4 24.687 614520.25 N 7016 55.630 W 149 4 23.852 614549.08 N 7016 55.508 W 149 4 23.017 614579.83 N 70 i 6 55.384 W 149 4 22.127 614608.70 N 70 16 55.267 W 149 4 21.291 614637.83 N 70 16 55.147 W 149 4 20.448 614666.14 N 70 16 55.024 W 149 4 19.629 614695.77 N 70 16 54.894 W 149 4 18.771 614726.16 N 70 16 54.767 W 149 417.892 9018.92 5965.44 6815.08 5989.65 -5247.91 2887.10 5.60 5953518.59 614754.33 N 70 16 54.648 W 149 4 17.077 9020.67 5992.09 6846.67 6014.69 -5260.52 2916.07 4.89 5953506.42 614783.48 N 70 16 54.524 W 149 4 16.233 9021.52 6018.47 6878.10 6039.53 -5272.85 2944.99 6.11 5953494.52 614812.57 N 70 16 54.402 W 149 4 15.391 9021.40 6046.00 6910.83 6065.52 -5285.80 2975.05 5.22 5953482.02 614842.82 N 70 16 54.275 W 149 4 14.515 9019.95 6073.29 6943.20 6091.36 -5298.71 3004.72 9.35 5953469.55 614872.68 N 7016 54.148 W 149 4 13.651 W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 5 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft ft ft ft de 00 tt ftUS ttUS 12715.38 96.58 114.03 8937.29 9016.99 6100.08 6974.88 6116.79 -5311.47 3033.72 8.04 5953457.22 12747.59 99.18 115.14 8932.88 9012.58 6127.30 7006.78 6142.74 -5324.74 3062.73 8.76 5953444.38 12778.95 101.19 114.90 8927.33 9007.03 6153.75 7037.64 6168.02 -5337.80 3090.70 6.45 5953431.75 12810.86 101.97 115.22 8920.92 9000.62 6180.55 7068.90 6193.69 -5351.04 3119.01 2.63 5953418.93 12842.48 102.36 113.90 8914.26 8993.96 6206.92 7099.81 6218.98 -5363.89 3147.13 4.26 5953406.50 12874.49 102.07 115.30 8907.49 8987.19 6233.61 7131.10 6244.63 -5376.91 3175.57 4.37 5953393.91 12907.10 102.08 115.28 8900.67 8980.37 6261.02 7162.99 6271.05 -5390.53 3204.40 0.07 5953380.72 12938.23 101.87 114.99 8894.21 8973.91 6287.15 7193.44 6296.28 -5403.47 3231,97 1.13 5953368.19 12970.22 101.77 114.79 8887.65 8967.35 6313.95 7224.75 6322.19 -5416.64 3260.38 0.69 5953355.44 13002.44 100.94 116.13 8881.31 8961.01 • 6341.15 7256.34 6348.56 -5430.22 3288.90 4.82 5953342.29 . 13033.12 100.68 115.94 8875.56 8955.26 6367.25 7286.48 6373.92 -5443.45 3315.97 1.04 5953329.47 13065.82 100.23 115.49 8869.62 8949.32 6395.01 7318.63 6400.93 -5457.40 3344.95 1.93 5953315.95 13097.74 99.67 115.94 8864.11 8943.81. 6422.15 7350.07 6427.39 -5471.05 3373.27 2.24 5953302.73 13129.53 99.67 115.52 8858.77 8938.47 6449.21 7381.41 6453.81 -5484.65 3401.50 1.30 5953289.55 13161.99 99.53 114.77 8853.35 8933.05 6476.67 7413.42 6480.66 -5498.25 3430.48 2.32 5953276.38 13193.19 98.92 115.77 8848.35 8928.05 6503.14 7444.21 6506.57 -5511.40 3458.32 3.72 5953263.65 13225.06 98.73 116.67 8843.46 8923.16 6530.46 7475.70 6533.40 -5525.31 3486.58 2.85 5953250.16 13257.27 98.74 115.42 8838.57 8918.27 6558.04 7507.54 6560.50 -5539.29 3515.18 3.84 5953236.61 13289.13 98.59 115.35 8833.77 8913.47 6585.13 7539.04 6587.17 -5552.79 3543.63 0.52 5953223.53 13320.90 97.91 117.01 8829.21 8908.91 6612.40 7570.48 6614.06 -5566.66 3571.85 5.60 5953210.08 13352.69 98.07 116.03 8824.79 8904.49 6639.80 7601.96 6641.13 -5580.72 3600.02 3.09 5953196.45 13384.22 97.71 116.78 8820.47 8900.17 6666.95 7633.19 6667.98 -5594.61 3627.99 2.62 5953182.98 13416.70 97.56 118.02 8816.15 8895.85 6695.20 7665.38 6695.98 -5609.42 3656.57 3.81 5953168:59 Last Survey 13430.21 97.80 117.10 8814.34 8894.04 6706.97 7678.77 6707.65 -5615.62 3668.44 6.98 5953162.58 TD (Projected) 13475.00 97.80 117.10 8808.27 8887.97 6745.81 7723.15 6746.22 -5635.83 3707.94 0.00 5953142.95 Survey Type: Definitive Survey NOTES: GYD CT DMS - (Gyrodata -cont. drillpipe m/s - -Gyrodata pump-down multishot surveys with continuou s tool (RGS-CT) in drill -pipe.) M WD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. • Assumes a BHA sag correction is applied to enhance inclinati on accuracy. ) Le4al Descriation: Northing (Y) (ftUS] Easting (X) [ftUS] Surface : 3749 FSL 1455 FEL S21 Ti 1 N R12E UM 5958722.52 611789.75 BHL : 3392 FSL 3040 FEL S27 Ti 1 N R12E UM 5953142.95 615580.78 614901.86 N 70 16 54.022 W 149 4 12.807 614931.06 N 70 16 53.891 W 149 4 11.962 614959.22 N 70 16 53.763 W 149 4 11.148 614987.73 N 70 16 53.632 W 149 4 10.323 615016.03 N 70 16 53.506 W 149 4 9.504 615044.66 N 70 16 53.378 W 149 4 8.676 615073.69 N 7016 53.244 W 149 4 7.836 615101.44 N 70 16 53.116 W 149 4 7.033 615130.04 N 7016 52.987 W 149 4 6.206 615158.75 N 7016 52.853 W 149 4 5.376 615186.02 N 7016 52.723 W 149 4 4.587 615215.20 N 70 16 52.585 W 149 4 3.744 615243.72 N 70 16 52.451 W 149 4 2.919 615272.15 N 70 16 52.317 W 149 4 2.097 615301.32 N 70 16 52.183 W 149 41.253. 615329.36 N 70 i 6 52.054 W 149 4 0.442 615357.81 N 7016 51.917 W 149 3 59.619 615386.61 N 70 16 51.779 W 149 3 58.786 615415.26 N 70 16 51.646 W 149 3 57.958 615443.68 N 70 16 51.510 W 149 3 57.136 615472.05 N 70 16 51.371 W 149 3 56.316 615500.23 N 7016 51.235 W 149 3 55.502 615529.02 N 7016 51.089 W 149 3 54.669 615540.98 N 70 16 51.028 W 149 3 54.324 615580.78 N 70 16 50.829 W 149 3 53.173 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 6 of 6 by ~~~~~~ _$ -. ~~~+~' Schlumberger W-45 Survev Resort Client: BP Exploratiat Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: WPAD / W-Spare Well: W-45 Borehole: W-45 UWUAPI#: 500292336900 Survey Name /Date: W-45 /December 19, 2007 Tart /AHD ! DDI / ERD ratio: 344.783° / 7723.15 ft / 6.600 / 0.856 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 7017 46.266, W 149 5 41.170 Location Grid NIE Y/X: N 5958722.520 ftUS, E 611769.750 ftUS Grid Convergence Angle: +0.85223572° Survey /DLS Computation Method: Minimum Curvature / Li Vertical Section Azimuth: 146.030° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 79.70 ft relative to MSL Sea Bed /Ground Level Elevation: 51.20 ft relative to MSL Magnetic Declination: 23.275° Total Field Strength: 57644.614 nT Magnetic Dip: 80.868° Declination Date: December 10, 2007 Magnetic Declination Model: BGGM 2007 North Reference: True Norlh Total Corr Mag North -> True North: +23.275° Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft tt ft ft tt de 00 ft ftUS ftUS h I t U.UO O.UU 0.UU -/9. /U O.UO 0.UU 0.00 U.00 U.UU 0.00 0.00 5958722.52 611789.75 N 70 17 46.266 W 149 5 41.170 GYD CT DMS 100.00 0.10 85.04 20.30 100.00 0.04 0.09 0.09 0.01 0.09 0.10 5958722.53 611789.84 N 70 17 46.266 W 149 5 41.167 200.00 0.13 38.75 120.30 200.00 0.05 0.28 0.27 0.10 0.24 0.09 5958722.63 611789.99 N 70 17 46.267 W 149 5 41.163 300.00 0.06 240.93 220.30 300.00 0.01 0.35 0.32 0.17 0.27 0.19 5958722.69 611790.02 N 70 17 46.268 W 149 5 41.162 400.00 0.46 223.22 320.30 400.00 0.10 0.80 0.16 -0.15 -0.05 0.40 5958722.37 611789.70 N 70 17 46.264 W 149 5 41.171 500.00 0.79 227.41 420.29 499.99 0.29 1.89 1.23 -0.91 -0.83 0.33 5958721.60 611788.93 N 70 17 46.257 W 149 5 41.194 600.00 1.04 228.11 520.28 599.98 0.52 3.48 2.83 -1.98 -2.02 0.25 5958720.51 611787.76 N 70 17 46.246 W 149 5 41.229 700.00 0.92 227.81 620.26 699.96 0.76 5.19 4.54 -3.13 -3.29 0.12 5958719.34 611786.51 N 70 17 46.235 W 149 5 41.266 800.00 1.44 74.09 720.26 799.96 1.26 6.39 4.26 -3.32 -2.67 2.30 5958719.16 611787.13 N 70 17 46.233 W 149 5 41.248 900.00 2.49 77.67 820.20 899.90 2.45 9.81 2.60 -2.51 0.66 1.06 5958720.02 611790.45 N 70 17 46.241 W 149 5 41.151 1000.00 4.00 86.12 920.03 999.73 5.00 15.46 6.52 -1.81 6.26 1.58 5958720.80 611796.04 N 70 17 46.248 W 149 5 40.987 1100.00 6.45 101.30 1019.61 1099.31 10.74 24.52 15.48 -2.68 15.25 2.79 5958720.07 611805.04 N 70 17 46.240 W 149 5 40.725 1200.00 7.80 105.00 1118.84 1198.54 19.85 36.92 27.87 -5.54 27.31 1.43 5958717.39 611817.14 N 70 17 46.211 W 149 5 40.374 1300.00 9.49 113.94 1217.71 1297.41 31.96 51.92 42.75 -10.64 41.40 2.15 5958712.50 611831.30 N 7017 46.161 W 149 5 39.963 MWD+IFR+MS 1325.28 10.07 116.42 1242.62 1322.32 35.64 56.21 46.97 -12.47 45.29 2.84 5958710.73 611835.21 N 7017 46.143 W 149 5 39.850 1420.05 11.46 121.66 1335.72 1415.42 51.42 73.90 64.28 -21.10 60.72 1.79 5958702.33 611850.77 N 70 17 46.058 W 149 5 39.400 1515.83 12.61 129.20 1429.40 1509.10 70.10 93.84 83.59 -32.70 76.92 2.03 5958690.97 611867.15 N 70 17 45.944 W i 49 5 38.928 1610.93 13.31 138.07 1522.09 1601.79 90.88 115.13 103.75 -47.41 92.29 2.21 5958676.50 611882.72 N 70 17 45.800 W 149 5 38.480 1707.32 13.32 146.29 1615.89 1695.59 112.97 137.30 124.17 -64.90 105.86 1.96 5958659.21 611896.56 N 70 17 45.628 W 149 5 38.084 1803.66 14.41 156.53 1709.44 1789.14 135.86 160.32 144.53 -85.13 116.80 2.78 5958639.14 611907.79 N 70 17 45.429 W 149 5 37.765 1898.32 18.54 167.67 1800.22 1879.92 161.45 187.09 166.72 -110.65 124.71 5.47 5958613.74 611916.08 N 70 17 45.178 W 149 5 37.535 1993.99 20.92 168.55 1890.26 1969.96 191.37 219.38 193.62 -142.26 131.35 2.51 5958582.24 611923.19 N 70 17 44.867 W 149 5 37.341 2089.32 21.79 171.72 1979.05 2058.75 223.04 254.09 223.56 -176.45 137.28 1.52 5958548.15 61.1929.62 N 70 17 44.531 W 149 5 37.169 2185.74 23.90 176.51 2067.91 2147.61 256.01 291.50 256.02 -213.66 141.04 2.92 5958511.00 611933.94 N 70 17 44.165 W 149 5 37.059 2281.70 28.23 178.54 2154.09 2233.79 291.91 333.65 292.94 -255.77 142.81 4.61 5958468.92 611936.33 N 70 17 43.750 W 149 5 37.008 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 1 of 6 Comments Measured inclination Azimuth Sub-Sea ND ND Vertical Afong Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft n tt ft ft ft ft de OOft ftUS ftUS 2376.65 29.13 178.07 2237.39 2317.09 330.44 379.22 334.03 -301.32 144.16 0.98 5958423.40 2472.02 30.53 176.59 2320.12 2399.82 370.98 426.65 378.18 -348.70 146.38 1.66 5958376.06 2568.48 31.64 175.05 2402.73 2482.43 414.20 476.45 425.68 -398.37 150.02 1.42 5958326.46 2664.88 34.23 175.33 2483.63 2563.33 459.97 528.86 476.31 -450.59 154.41 2.69 5958274.31 2760.18 34.53 174.10 2562.29 2641.99 507.18 582.67 528.76 -504.17 159.37 0.79 5958220.82 2854.97 33.80 174.55 2640.72 2720.42 554.05 635.91 580.96 -557.14 164.63 0.81 5958167.93 2951.40 33.48 173.61 2721.00 2800.70 601.19 689.32 633.55 -610.28 170.14 0.63 5958114.89 3047.40 33.21 173.95 2801.19 2880.89 647.89 742.09 685.67 -662.74 175.86 0.34 5958062.53 3142.66 32.93 173.75 2881.02 2960.72 693.86 794.07 737.09 -714.42 181.43 0.32 5958010.94 3238.52 32.41 173.03 2961.72 3041.42 739.82 845.82 788.41 -765.82 187.38 0.68 5957959.64 • 3333.41 31.96 173.88 3042.03 3121.73 784.68 896.36 838.58 •816.03 193.14 0.67 5957909.52 3429.00 31.62 173.22 3123.28 3202.98 829.34 946.72 888.59 -866.07 198.80 0.51 5957859.58 3525.53 31.41 173.79 3205.57 3285.27 874.11 997.18 938.75 -916.20 204.51 0.38 5957809.54 3581.32 31.24 173.83 3253.23 3332.93 899.77 1026.18 967.58 -945.04 207.64 0.31 5957780.76 3711.91 30.54 173.25 3365.29 3444.99 959.23 1093.22 1034.29 -1011.65 215.18 0.58 5957714.27 3806.56 30.28 172.92 3446.92 3526.62 1001.89 1141.13 1082.01 -1059.22 220.94 0.33 5957666.80 3902.76 29.22 172.59 3530.44 3610.14 1044.53 1188.87 1129.61 -1106.57 226.96 1.11 5957619.54 3998.87 28.67 173.85 3614.55 3694.25 1085.90 1235.38 1175.96 -1152.76 232.46 0.85 5957573.45 4093.25 27.84 174.09 3697.68 3777.38 1125.37 1280.06 1220.45 -1197.19 237.15 0.89 5957529.10 4188.76 27.10 174.09 3782.42 3862.12 1164.25 1324.12 1264.33 -1241.01 241.69 0.77 5957485.35 4287.45 26.53 174.15 3870.50 3950.20 1203.53 1368.64 1308.67 -1285.30 246.25 0.58 5957441.14 4388.34 27.56 175.38 3960.35 4040.05 1243.75 1414.51 1354.33 -1330.98 250.43 1.16 5957395.53 4485.43 27.42 175.67 4046.48 4126.18 1282.75 1459.32 1398.90 -1375.66 253.92 0.20 5957350.91 4579.98 28.36 175.58 4130.05 4209.75 1321.21 1503.55 1442.88 -1419.76 257.30 1.00 5957306.87 4675.25 29.81 176.60 4213.30 4293.00 1361.29 1549.86 1488.91 -1465.96 260.45 1.61 5957260.73 4770.14 30.93 176.65 4295.17 4374.87 1402.58 1597.84 1536.57 -1513.85 263.27 1.18 5957212.89 4865.20 32.15 175.93 4376.19 4455.89 1445.53 1647.56 1586.02 -1563.47 266.49 1.34 5957163.33 • 4960.14 5055.83 32.67 33.27 175.90 176.33 4456.34 4536.62 4536.04 4616.32 1489.65 1534.71 1698.44 1750.52 1636.67 1688.50 -1614.22 -1666.18 270.12 273.64 0.55 0.67 5957112.64 5957060.74 5151.21 34.02 175.72 4616.02 4695.72 1580.48 1803.36 1741.12 -1718.89 277.31 0.86 5957008.09 5246.77 33.00 174.93 4695.70 4775.40 1626.49 1856.12 1793.72 -1771.47 281.60 1.16 5956955.59 5341.78 32.86 174.40 4775.44 4855.14 1671.82 1907.77 1845.26 -1822.90 286.41 0.34 5956904.24 5437.45 32.56 173.80 4855.94 4935.64 1717.43 1959.47 1896.89 -1874.32 291.72 0.46 5956852.91 5533.41 31.26 173.93 4937.40 5017.10 1762.29 2010.19 1947.56 -1924.75 297.14 1.36 5956802.57 5628.69 31.44 173.85 5018.77 5098.47 1806.11 2059.76 1997.07 -1974.04 302.42 0.19 5956753.37 5724.82 31.04 174.15 5100.96 5180.66 1850.14 2109.61 2046.87 -2023.62 307.63 0.45 5956703.87 5820.83 29.86 173.35 5183.72 5263.42 1893.21 2158.27 2095.49 -2071.99 312.92 1.30 5956655.59 5917.30 29.29 174.11 5267.63 5347.33 1935.37 2205.88 2143.06 -2119.32 318.12 0.71 5956608.35 6011.96 28.77 174.48 5350.39 5430.09 1975.83 2251.82 2188.94 -2165.03 322.69 0.58 5956562.72 6108.08 28.64 173.25 5434.70 5514.40 2016.65 2297.98 2235.07 -2210.93 327.62 0.63 5956516.90 6203.01 28.16 172.94 5518.21 5597.91 2056.86 2343.13 2280.20 -2255.75 333.05 0.53 5956472.17 6298.43 27.77 172.46 5602.48 5682.18 2096.84 2387.88 2324.94 -2300.13 338.73 0.47 5956427.88 611938.36 N 7017 43.302 W 149 5 36.968 611941.29 N 7017 42.836 W 149 5 36.903 611945.66 N 70 17 42.348 W 149 5 36.797 611950.83 N 70 17 41.834 W 149 5 36.669 611956.58 N 7017 41.307 W 149 5 36.525 611962.64 N 7017 40.786 W 149 5 36.371 611968.93 N 70 17 40.264 W 149 5 36.211 611975.43 N 7017 39.748 W 149 5 36.044 611981.77 N 7017 39.240 W 149 5 35.882 611988.48 N 70 17 38.734 W 149 5 35.709 611994.99 N 70 17 38.240 W 149 5 35.541 612001.39 N 70 17 37.748 W 149 5 35.376 612007.84 N 7017 37.255 W 149 5 35.210 612011.40 N 7017 36.972 W 149 5 35.118 61.2019.93 N 7017 36.316 W 149 5 34.899 612026.40 N 70 17 35.849 W 149.5 34.731 612033.12 N 70 17 35.383 W 149 5 34.555 612039.30 N 7017 34.929 W 149 5 34.395 612044.66 N 70 17 34.492 W 149 5 34.259 612049.85 N 70 17 34.061 W 149 5 34.126 612055.07 N 70 17 33.625 W 149 5 33.993 612059.92 N 70 17 33.176 W 149 5 33.872 612064.08 N 70 17 32.736 W 149 5 33.770 612068.11 N 70 17 32.303 W 149 5 33.672 612071.95 N 7017 31.848 W 149 5 33.580 612075.48 N 70 17 31.377 W 149 5 33.498 612079.44 N 7017 30.889 W 149 5 33.404 612083.82 N 70 17 30.390 W 149 5 33.298 612088.12 N 7017 29.879 W 149 5 33.196 612092.57 N 70 17 29.361 W 149 5 33.089 612097.64 N 70 17 28.844 W 149 5 32,964 612103.21 N 70 17 28.338 W 149 5 32.824 612109.29 N 70 17 27.832 W 149 5 32.669 612115.46 N 7017 27.336 W 149 5 32.511 612121.47 N 7017 26.851 W 149 5 32.357 612127.41 N 7017 26.364 W 149 5 32.206 612133.42 N 7017 25.888 W 149 5 32.051 612139.33 N 7017 25.423 W 149 5 31.900 612144.58 N 70 17 24.973 W 149 5 31.767 612150.19 N 70 17 24.522 W 149 5 31.623 612156.28 N 70 17 24.081 W 149 5 31.465 612162.63 N 70 17 23.644 W 149 5 31.300 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 2 of 6 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de N ff ft ft ft ft ft de 00ft ftUS ftUS 6394.24 27.15 172.48 5687.50 5767.20 2136.40 2432.06 2369.12 -2343.93 344.52 0.65 5956384.18 612169.07 N 70 17 23.213 W 149 5 31.131 6490.42 26.09 173.48 5773.48 5853.18 2174.82 2475.15 2412.20 -2386.70 349.80 1.20 5956341.49 612174.97 N 70 17 22.793 W 149 5 30.977 6585.74 28.51 178.88 5858.19 5937.89 2212.54 2518.84 2455.73 -2430.28 352.62 3.63 5956297.96 612178.45 N 70 17 22.364 W 149 5 30.895 6679.94 30.78 180.54 5940.06 6019.76 2251.29 2565.43 2501.87 -2476.87 352.84 2.56 5956251.39 612179.35 N 7017 21.906 W 149 5 30.889 i 6777.59 30.29 180.23 6024.17 6103.87 2292.25 2615.04 2550.95 -2526.48 352.50 0.53 5956201.78 612179.76 N 70 17 21.418 W 149 5 30.899 6872.97 29.05 178.51 6107.04 6186.74 2331.68 2662.25 2597.78 -2573.69 353.01 1.58 5956154.59 612180.96 N 70 17 20.954 W 149 5 30.884 6968.88 28.95 176.44 6190.93 6270.63 2371.34 2708.75 2644.08 -2620.13 355.05 1.05 5956108.19 612183.70 N 70 17 20.497 W 149 5 30.824 7063.25 27.35 176.28 6274.13 6353.83 2409.77 2753.27 2688.49 -2664.56 357.88 1.70 5956063.81 612187.19 N 7017 20.060 W 149 5 30.742 7160.23 29.47 172.53 6359.43 6439.13 2450.37 2799.39 2734.58 -2710.46 362.43 2.86 5956017.99 612192.42 N 7017 19.609 W 149 5 30.610 7255.97 29.10 170.86 6442.94 6522.64 2492.58 2846.22 2781.40 -2756.79 369.19 0.94 5955971.76 612199.86 N 7017 19.153 W 149 5 30.413 7352.16 26.29 172.14 6528.10 6607.80 2532.94 2890.92 2826.10 -2801.00 375.82 2.99 5955927.67 612207.15 N 70 17 18.718 W 149 5 30.220 7447.45 24.30 173.45 6614.25 6693.95 2569.30 2931.63 2866.81 -2841.38 380.94 2.17 5955887.36 612212.87 N 70 17 18.321 W 149 5 30.071 7542.88 24.02 172.14 6701.32 6781.02 2604.17 2970.69 2905.86 -2880.13 385.84 0.63 5955848.70 612218.34 N 7017 17.940 W 149 5 29.928 7638.70 25.91 171.40 6788.19 6867.89 2640.60 3011.13 2946.30 -2920.15 391.63 2.00 5955808.77 612224.74 N 70 17 17.546 W 149 5 29.759 7733.84 26.12 170.78 6873.69 6953.39 2678.40 3052.86 2988.02 -2961.38 398.10 0.36 5955767.65 612231.81 N 7017 17.141 W 149 5 29.571 7820.65 25.68 170.33 6951.78 7031.48 2712.90 3090.78 3025.92 -2998.78 404.32 0.56 5955730.34 612238.59 N 70 17 16.773 W 149 5 29.390 7910.83 28.08 172.48 7032.21 7111.91 2749.72 3131.54 3066.68 -3039.09 410.38 2.87 5955690.13 612245.25 N 70 17 16.377 W 149 5 29.213 8007.69 33.99 175.57 7115.17 7194.87 2793.72 3181.45 3116.55 -3088.73 415.46 6.32 5955640.58 612251.06 N 7017 15.888 W 149 5 29.065 8103.17 33.64 175.69 7194.50 7274.20 2839.92 3234.59 3169.60 -3141.72 419.51 0.37 5955587.67 612255.90 N 70 17 15.367 W 149 5 28.947 8199.11 34.52 175.69 7273.96 7353.66 2886.64 3288.34 3223.27 -3195.32 423.55 0.92 5955534.13 612260.74 N 70 17 14.840 W 149 5 28.830 8294.24 36.87 173.46 7351.22 7430.92 2935.40 3343.84 3278.73 -3250.57 428.83 2.82 5955478.98 612266.83 N 70 17 14.297 W 149 5 28.676 8390.76 36.65 170.64 7428.55 7508.25 2987.30 3401.60 3336.48 -3307.76 436.81 1.76 5955421.91 612275.67 N 70 17 13.734 W 149 5 28.443 8486.71 36.71 172.59 7505.51 7585.21 3038.99 3458.91 3393.78 -3364.46 445.17 1.22 5955365.35 612284.86 N 7017 13.177 W 149 5 28.200 8582.90 35.79 171.57 7583.08 7662.78 3090.08 3515.79 3450.66 -3420.79 453.00 1.14 5955309.14 612293.53 N 70 17 12.623 W 149 5 27.972 8678.62 34.67 172.49 7661.27 7740.97 3139.71 3571.00 3505.87 -3475.47 460.66 1.29 5955254.59 612302.01 N 70 17 12.085 W 149 5 27.749 8773.80 33.42 172.48 7740.13 7819.83 3187.42 3624.29 3559.15 -3528.30 467.63 1.31 5955201.88 612309.76 N 70 17 11.565 W 149 5 27.546 8871.23 31.75 172.93 7822.22 7901.92 3234.30 3676.76 3611.62 -3580.34 474.29 1.73 5955149.94 612317.20 N 7017 11.053 W 149 5 27.352 8966.49 31.66 174.14 7903.27 7982.97 3278.71 3726.82 3661.67 -3630.09 479.93 0.67 5955100.29 612323.58 N 70 17 10.564 W 149 5 27.188 • 9062.34 32.38 173.76 7984.53 8064.23 3323.61 3777.64 3712.48 -3680.62 485.29 0.78 5955049.84 612329.68 N 70 17 10.067 W 149 5 27.032 9156.61 32.21 174.24 8064.22 8143.92 3368.10 3828.00 3762.83 -3730.71 490.56 0.33 5954999.84 612335.69 N 70 17 9.574 W 149 5 26.878 9252.49 33.83 174.09 8144.61 8224.31 3414.17 3880.25 3815.05 -3782.69 495.87 1.69 5954947.96 612341.78 N 70 17 9.063 W 149 5 26.724 9347.55 31.65 175.03 8224.56 8304.26 3459.34 3931.66 3866.43 -3833.86 500.75 2.35 5954896.87 612347.42 N 70 17 8.560 W 149 5 26.581 9443.06 30.80 173.56 8306.24 8385.94 3502.94 3981.17 3915.91 -3883.13 505.67 1.20 5954847.68 612353.07 N 70 17 8.075 W 149 5 26.438 9539.28 35.99 167.31 8386.57 8466.27 3551.18 4034.07 3968.75 -3935.24 514.65 6.47 5954795.72 612362.82 N 70 17 7.563 W 149 5 26.177 9634.16 39.39 163.68 8461.65 8541.35 3605.87 4092.06 4026.29 -3991.35 529.24 4.28 5954739.83 612378.25 N 70 17 7.011 W 149 5 25.752 9743.37 38.21 163.23 8546.76 8626.46 3671.15 4160.49 4093.89 -4056.95 548.72 1.11 5954674.54 612398.70 N 70 17 6.366 W 149 5 25.184 9776.03 40.77 160.37 8571.96 8651.66 3691.14 4181.26 4114.30 -4076.67 555.22 9.61 5954654.92 612405.49 N 7017 6.172 W 149 5 24.995 9807.79 41.18 156.98 8595.95 8675.65 3711.45 4202.08 4134.54 -4096.06 562.80 7.12 5954635.64 612413.35 N 7017 5.981 W 149 5 24.775 9838.91 42.34 150.90 8619.17 8698.87 3731.96 4222.79 4154.21 -4114.66 571.90 13.53 5954617.19 612422.73 N 7017 5.798 W 149 5 24.509 9872.18 41.77 143.83 8643.89 8723.59 3754.21 4245.06 4174.44 -4133.40 583.90 14.33 5954598.62 612435.01 N 7017 5.614 W 149 5 24.160 9902.61 42.26 138.43 8666.50 8746.20 3774.49 4265.42 4191.93 -4149.25 596.67 11.98 5954582.97 612448.02 N 70 17 5.458 W 149 5 23.788 9935.17 44.51 136.24 8690.17 8769.87 3796.59 4287.79 4210.37 -4165.68 611.83 8.31 5954566.76 612463.42 N 7017 5.296 W 149 5 23.346 9967.30 44.97 132.23 8712.99 8792.69 3818.72 4310.40 4228.35 -4181.45 628.03 8.90 5954551.24 612479.85 N 7017 5.141 W 149 5 22.874 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1 /1 8/2008 12:36 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea ND 7Vp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft tt ft tt de 00 ft ftUS ftUS 9998.03 44.83 126.94 8734.77 8814.47 3839.51 4332.08 4244.52 -4195.26 644.74 12.16 5954537.68 612496.76 N 70 17 5.006 W 149 5 22.388 10030.56 44.73 123.33 8757.86 8837.56 3860.91 4354.99 4260.42 -4208.45 663.47 7.82 5954524.78 612515.68 N 7017 4.876 W 149 5 21.842 10062.76 43.84 118.73 8780.92 8860.62 3881.28 4377.47 4274.90 -4220.04 682.72 10.35 5954513.48 612535.10 N 70 17 4.762 W 149 5 21.281 10094.94 44.18 118.88 8804.06 8883.76 3901.16 4399.83 4288.70 -4230.81 702.31 1.11 5954503.00 612554.85 N 70 17 4.656 W 149 5 20.711 10126.38 47.82 121.63 8825.90 8905.60 3921.53 4422.44 4303.19 -4242.21 721.83 13.18 5954491.88 612574.53 N 70 17 4.544 W 149 5 20.142 10158.14 51.76 123.74 8846.40 8926.10 3943.79 4446.68 4319.57 -4255.32 742.23 13.40 5954479.08 612595.12 N 7017 4.415 W 149 519.548 10190.25 56.34 124.76 8865.25 8944.95 3967.93 4472.67 4337.71 -4269.95 763.71 14.49 5954464.78 612616.81 N 70 17 4.271 W 149 5 18.922 10221.78 61.26 124.24 8881.58 8961.28 3993.01 4499.63 4356.69 -4285.22 785.93 15.67 5954449.84 612639.26 N 70 17 4.121 W 149 5 18.275 10252.97 65.50 123.39 8895.55 8975.25 4018.81 4527.51 4376.17 -4300.73 809.10 13.81 5954434.68 612662.65 N 7017 3.968 W 149 5 17.600 10285.92 70.03 123.38 8908.01 8987.71 4046.96 4558.00 4397.43 -4317.51 834.56 13.75 5954418.28 612688.35 N 70 17 3.803 W 149 516.858 • 10317.94 73.89 122.64 8917.93 8997.63 4074.97 4588.44 4418.61 -4334.09 860.08 12.25 5954402.08 612714.12 N 7017 3.640 W 149 5 16.115 10348.99 76.64 121.62 8925.83 9005.53 4102.42 4618.47 4439.27 -4350.06 885.51 9.41 5954386.50 612739.78 N 70 17 3.483 W 149 5 15.374 10381.66 81.23 120.74 8932.09 9011.79 4131.51 4650.52 4461.06 -4366.65 912.94 14.30 5954370.31 612767.45 N 70 17 3.320 W 149 514.575 10413.16 85.93 118.80 8935.62 9015.32 4159.57 4681.82 4481.89 -4382.19 940.10 16.13 5954355.19 612794.84 N 70 17 3.167 W 149 513.784 10444.10 90.50 118.72 8936.58 9016.28 4187.05 4712.73 4502.18 -4397.06 967.20 14.77 5954340.72 612822.16 N 70 17 3.021 W 149 512.995 10475.92 94.87 119.04 8935.09 9014.79 4215.32 4744.51 4523.21 -4412.41 995.03 13.77 5954325.79 612850.20 N 70 17 2.870 W 149 5 12.184 10515.96 100.82 118.18 8929.63 9009.33 4250.52 4784.16 4549.48 -4431.39 1029.83 15.01 5954307.32 612885.28 N 70 17 2.683 W 149 5 11.170 10547.80 101.10 118.01 8923.57 9003.27 4278.13 4815.42 4570.13 -4446.12 1057.41 1.02 5954293.01 612913.07 N 7017 2.538 W 149 5 10.367 10578.28 100.79 118.17 8917.79 8997.49 4304.57 4845.34 4590.00 -4460.21 1083.81 1.14 5954279.32 612939.68 N 7017 2.399 W 149 5 9.598 10610.15 100.63 119.61 8911.86 8991.56 4332.44 4876.66 4611.23 -4475.34 1111.23 4.47 5954264.60 612967.32 N 7017 2.250 W 149 5 8.800 10643.60 99.61 118.05 8905.99 8985.69 4361.72 4909.59 4633.65 -4491.21 1140.07 5.51 5954249.15 612996.39 N 70 17 2.094 W 149 5 7.959 10674.97 96.00 118.57 8901.73 8981.43 4389.23 4940.66 4654.73 -4505.95 1167.43 11.62 5954234.83 613023.96 N 7017 1.949 W 149 5 7.162 10705.95 94.76 119.29 8898.82 8978.52 4416.69 4971.50 4675.99 -4520.87 1194.42 4.62 5954220.31 613051.17 N 70 17 1.803 W 149 5 6.376 10737.12 93.45 118.82 8896.59 8976.29 4444.40 5002.59 4697.59 -4535.97 1221.60 4.46 5954205.62 613078.57 N 70 171.654 W 149 5 5.585 10770.01 92.15 116.09 8894.98 8974.68 4473.24 5035.44 4719.85 -4551.11 1250.75 9.18 5954190.91 613107.94 N 70 17 1.505 W 149 5 4.736 10801.20 92.01 113.56 8893.85 8973.55 4499.90 5066.61 4740.02 -4564.20 1279.04 8.12 5954178.25 613136.41 N 7017 1.376 W 149 5 3.912 10833.00 90.30 112.08 8893.21 8972.91 4526.50 5098.40 4759.87 -4576.53 1308.34 7.11 5954166.36 613165.89 N 7017 1.255 W 149 5 3.058 10865.24 89.31 111.72 8893.32 8973.02 4553.19 5130.64 4779.72 -4588.55 1338.25 3.27 5954154.78 613195.98 N 7017 1.137 W 149 5 2.187 • 10896.47 89.64 111.95 8893.61 8973.31 4579.01 5161.87 4799.05 -4600.17 1367.24 1.29 5954143.60 613225.13 N 70 17 1.022 W 149 5 1.342 10927.52 90.33 111.25 8893.61 8973.31 4604.63 5192.92 4818.29 -4611.60 1396.11 3.17 5954132.60 613254.17 N 7017 0.910 W 149 5 0.502 10960.24 92.66 111.26 8892.76 8972.46 4631.49 5225.63 4838.54 -4623.45 1426.59 7.12 5954121.20 613284.82 N 70 17 0.793 W 149 4 59.614 10992.74 93.49 109.86 8891.02 8970.72 4657.92 5258.08 4858.46 -4634.85 1456.98 5.00 5954110.26 613315.37 N 70 17 0.681 W 149 4 58.729 11025.40 93.39 109.60 8889.06 8968.76 4684.19 5290.68 4878.23 -4645.86 1487.66 0.85 5954099.71 613346.21 N 70 17 0.573 W 149 4 57.835 11057.04 93.32 110.28 8887.21 8966.91 4709.72 5322.27 4897.61 -4656.63 1517.36 2.16 5954089.38 613376.06 N 70 17 0.467 W 149 4 56.970 11088.88 93.04 109.36 8885.44 8965.14 4735.37 5354.06 4917.19 -4667.41 1547.26 3.02 5954079.05 613406.12 N 70 17 0.361 W 149 4 56.099 11120.19 92.24 109.91 8884.00 8963.70 4760.55 5385.34 4936.49 -4677.92 1576.72 3.10 5954068.98 613435.73 N 7017 0.257 W 149 4 55.241 11151.81 92.00 110.00 8882.83 8962.53 4786.08 5416.93 4956.26 -4688.70 1606.42 0.81 5954058.64 613465.59 N 7017 0.151 W 149 4 54.376 11183.84 91.80 109.78 8881.77 8961.47 4811.94 5448.95 4976.38 -4699.59 1636.52 0.93 5954048.20 613495.84 N 70 17 0.044 W 149 4 53.499 11216.53 91.88 111.42 8880.72 8960.42 4838.56 5481.62 4997.36 -4711.09 1667.11 5.02 5954037.16 613526.59 N 70 16 59.931 W 149 4 52.608 11248.10 91.67 111.16 8879.74 8959.44 4864.49 5513.17 5018.02 -4722.54 1696.51 1.06 5954026.14 613556.16 N 70 16 59.818 W 149 4 51.752 11280.52 90.99 110.64 8878.98 8958.68 4891.00 5545.58 5039.20 -4734.11 1726.79 2.64 5954015.03 613586.60 N 7016 59.704 W 149 4 50.870 11312.19 90.15 110.78 8878.67 8958.37 4916.84 5577.25 5059.93 -4745.31 1756.41 2.69 5954004.28 613616.39 N 7016 59.594 W 149 4 50.007 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/1 8/2008 1 2:36 PM Page 4 of 6 Comments Measured Inclination Azimuth Sub-Sea ND 7Vp Vertical Along Hole Closure NS EW DLS Northing EasUng Latitude Longitude Depth Section Departure ft de de ft it ft ft ft ft ft de OOft ftUS itUS 11344.05 90.04 111.72 8878.62 8958.32 4943.00 5609.11 5081.1E -4756.85 1786.10 2.97 5953993.17 11376.17 91.57 112.72 8878.17 8957.87 4969.69 5641.23 5103.00 -4769.00 1815.83 5.69 5953981.47 11408.18 94.83 111.38 8876.38 8956.08 4996.19 5673.18 5124.80 -4781.00 1845.45 11.01 5953969.92 11439.97 95.27 111.53 8873.58 8953.28 5022.26 5704.85 5146.27 -4792.58 1874.92 1.46 5953958.78 11472.58 94.82 112.12 8870.71 8950.41 5049.12 5737.34 5168.56 -4804.65 1905.08 2.27 5953947.15 11503.22 94.79 111.57 8868.15 8947.85 5074.38 5767.87 5189.62 -4816.02 1933.42 1.79 5953936.22 11535.75 94.01 111.77 8865.65 8945.35 5101.16 5800.30 5212.01 -4827.99 1963.56 2.47 5953924.69 11567.90 93.66 113.13 8863.50 8943.20 5127.88 5832.38 5234.58 -4840.24 1993.21 4.36 5953912.88 11599.85 92.29 112.36 8861.84 8941.54 5154.55 5864.29 5257.24 -4852.58 2022.63 4.92 5953900.99 11631.82 90.71 112.75 8861.01 8940.71 5181.21 5896.24 5279.95 -4864.84 2052.14 5.09 5953889.17 • 11663.88 11695.73 90.61 90.31 114.27 114.50 8860.64 8860.38 8940.34 8940.08 5208.24 5235.35 5928.30 5960.15 5303.21 5326.73 -4877.62 -4890.77 2081.54 2110.55 4.75 1.19 5953876.82 5953864.11 11727.82 90.49 114.91 8860.16 8939.86 5262.76 5992.24 5350.64 -4904.18 2139.70 1.40 5953851.13 11760.08 91.40 115.09 8859.62 8939.32 5290.40 6024.49 5374.87 -4917.82 2168.93 2.88 5953837.94 11790.86 90.26 114.72 8859.18 8938.88 5316.75 6055.27 5398.03 -4930.78 2196.85 3.89 5953825.39 11822;26 88.34 116.87 8859.56 8939.26 5343.87 6086.67 5422.05 -4944.44 2225.11 9.18 5953812.16 11855.29 85.32 115.76 8861.39 8941.09 5372.51 6119.64 5447.55 -4959.06 2254.67 9.74 5953797.98 11887.02 81.41 116.74 8865.05 8944.75 5399.86 6151.15 5471.97 -4972.99 2282.93 12.70 5953784.47 11918.46 81.07 115.98 8869.84 8949.54 5426.86 6182.23 5496.16 -4986.79 2310.77 2.62 5953771.09 11950.31 80.76 116.81 8874.87 8954.57 5454.20 6213.68 5520.72 -5000.77 2338.95 2.75 5953757.53 11982.97 82.01 115.18 8879.76 8959.46 5482.15 6245.97 5545.87 -5014.92 2367.97 6.24 5953743.81 12013.58 82.02 115.84 8884.02 8963.72 5508.26 6276.28 5569.39 -5027.98 2395.33 2.14 5953731.17 12045.79 83.60 115.24 8888.05 8967.75 5535.80 6308.24 5594.27 -5041.75 2424.16 5.24 5953717.82 12077.45 84.53 114.30 8891.32 8971.02 5562.72 6339.73 5618.58 -5054.95 2452.75 4.17 5953705.05 12109.46 83.83 114.98 8894.57 8974.27 5589.90 6371.57 5643.20 -5068.22 2481.70 3.04 5953692.21 12141.38 84.63 114.88 8897.78 8977.48 5617.09 6403.33 5667.92 -5081.61 2510.50 2.53 5953679.26 12172.82 84.13 115.11 8900.86 8980.56 5643.90 6434.62 5692.37 -5094.83 2538.86 1.75 5953666.46 12205.01 84.26 114.51 8904.11 8983,81 5671.29 6466.64 5717.40 -5108.27 2567.92 1.90 5953653.46 . 12236.74 83.82 114.95 8907.41 8987,11 5698.26 6498.20 5742.10 -5121.47 2596.59 1.96 5953640.68 12269.10 84.05 114.92 8910.82 8990.52 5725.81 6530.38 5767.43 -5135.04 2625.77 0.72 5953627.55 12300.85 83.02 114.21 8914.40 8994.10 5752.72 6561.93 5792.20 -5148.15 2654.46 3.93 5953614.87 12332.29 82.41 112.29 8918.39 8998.09 5778.94 6593.12 5816.31 -5160.46 2683.11 6.36 5953602.99 12365.62 83.13 112.49 8922.58 9002.28 5806.47 6626.18 5841.63 -5173.06 2713.68 2.24 5953590.85 12396.92 83.06 112.63 8926.34 9006.04 5832.39 6657.25 5865.55 -5184.98 2742.38 0.50 5953579.36 12428.58 83.20 113.21 8930.13 9009.83 5858.72 6688.69 5889.94 -5197.22 2771.33 1.87 5953567.55 12459.55 84.10 114.63 8933.56 9013.26 5884.79 6719.46 5914.22 -5209.70 2799.47 5.40 5953555.49 12491.91 87.31 113.66 8935.98 9015.68 5912.18 6751.73 5939.81 -5222.90 2828.91 10.36 5953542.73 12524.80 87.38 112.72 8937.50 9017.20 5939.79 6784.58 5965.61 -5235.83 2859.11 2.86 5953530.25 12555.34 86.18 113.94 8939.22 9018.92 5965.44 6815.08 5989.65 -5247.91 2887.10 5.60 5953518.59 12586.98 87.48 113.10 8940.97 9020.67 5992.09 6846.67 6014.69 -5260.52 2916.07 4.89 5953506.42 12618.43 89.40 113.09 8941.82 9021.52 6018.47 6878.10 6039.53 -5272.85 2944.99 6.11 5953494.52 12651.16 91.05 113.53 8941.70 9021.40 6046.00 6910.83 6065.52 -5285.80 2975.05 5.22 5953482.02 12683.56 94.08 113.49 8940.25 9019.95 6073.29 6943.20 6091.36 -5298.71 3004.72 9.35 5953469.55 613646.24 N 70 16 59.481 W 149 4 49.142 613676.15 N 70 16 59.361 W 149 4 48.276 613705.94 N 7016 59.243 W 149 4 47.414 613735,58 N 7016 59.129 W 149 4 46.555 613765,91 N 7016 59.010 W 149 4 45.677 613794.41 N 70 i 6 58.898 W 149 4 44.851 613824.72 N 7016 58.780 W 149 4 43.974 613854.55 N 7016 58.660 W 149 4 43.110 613884.15 N 7016 58.538 W 149 4 42.253 613913.84 N 70 1658.418 W 149 4 41.394 613943.42 N 70 16 58.292 W 149 4 40.537 613972.62 N 7016 58.163 W 149 4 39.693 614001.96 N 7016 58.031 W 149 4 38.843 614031.39 N 70 16 57.896 W 149 4 37.992 614059.49 N 70 i 6 57.769 W 149 4 37.179 614087.96 N 70 16 57.634 W 149 4 36.356 614117.73 N 70 16 57.491 W 149 4 35.495 614146.19 N 7016 57.353 W 149 4 34.672 614174.23 614202.61 614231.83 614259.38 614288.41 614317.20 614346.33 614375.32 614403.87 614433.14 614461.99 614491.37 614520.25 614549.08 614579.83 614608.70 614637.83 614666.14 614695.77 614726.16 614754.33 614783.48 614812.57 614842.82 614872.68 N 7016 57.218 N 70 16 57.080 N 7016 56.941 N 70 16 56.812 N 7016 56.677 N 7016 56.547 N 70 16 56.416 N 70 16 56.285 N 70 16 56.154 N 7016 56.022 N 7016 55.892 N 7016 55.759 N 7016 55.630 N 70 16 55.508 N 70 16 55.384 N 7016 55.267 N 7016 55.147 N 7016 55.024 N 7016 54.894 N 7016 54.767 N 70 16 54.648 N 70 16 54.524 N 70 16 54.402 N 70 16 54.275 N 70 16 54.148 W 149 4 33.861 W 149 4 33.041 W 149 4 32.195 W 149 4 31.399 W 149 4 30.559 W 149 4 29.726 W 149 4 28.883 W 149 4 28.044 W 149 4 27.219 W 149 4 26.372 W 149 4 25.537 W 149 4 24.687 W 149 4 23.852 W 149 4 23.017 W 149 4 22.127 W 149 4 21.291 W 149 4 20.448 W 149 4 19.629 W 149 4 18.771 W 149 4 17.892 W 149 4 17.077 W 149 4 16.233 W 149415.391 W 149 4 14.515 W 149 4 13.651 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1/18/2008 12:36 PM Page 5 of 6 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hale Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft ft ft ft de f10ft ftUS ftUS 12715.38 96.58 114.03 8937.29 9016.99 6100.08 6974.88 6116.79 -5311 .47 3033.72 8.04 5953457.22 12747.59 99.18 115.14 8932.88 9012.58 6127.30 7006.78 6142.74 -5324 .74 3062.73 8.76 5953444.38 12778.95 101.19 114.90 8927.33 9007.03 6153.75 7037.64 6168.02 -5337 .80 3090.70 6.45 5953431.75 12810.86 101.97 115.22 8920.92 9000.62 6180.55 7068.90 6193.69 -5351 .04 3119.01 2.63 5953418.93 12842.48 102.36 113.90 8914.26 8993.96 6206.92 7099.81 6218.98 -5363 .89 3147.13 4.26 5953406.50 12874.49 102.07 115.30 8907.49 8987.19 6233.61 7131.10 6244.63 -5376.91 3175.57 4.37 5953393.91 12907.10 102.08 115.28 8900.67 8980.37 6261.02 7162.99 6271.05 -5390.53 3204.40 0.07 5953380.72 12938.23 101.87 114.99 8894.21 8973.91 6287.15 7193.44 6296.28 -5403.47 3231.97 1.13 5953368.19 12970.22 101.77 114.79 8887.65 8967.35 6313.95 7224.75 6322.19 -5416.64 3260.38 0.69 5953355.44 13002.44 100.94 116.13 8881.31 8961.01 6341.15 7256.34 6348.56 -5430.22 3288.90 4.82 5953342.29 • 13033.12 100.68 115.94 8875.56 8955.26 6367.25 7286.48 6373.92 -5443.45 3315.97 1.04 5953329.47 13065.82 100.23 115.49 8869.62 8949.32 6395.01 7318.63 6400.93 -5457.40 3344.95 1.93 5953315.95 13097.74 99.67 115.94 8864.11 8943.81 6422.15 7350.07 6427.39 -5471.05 3373.27 2.24 5953302.73 13129.53 99.67 115.52 8858.77 8938.47 6449.21 7381.41 6453.81 -5484.65 3401.50 1.30 5953289.55 13161.99 99.53 114.77 8853.35 8933.05 6476.67 7413.42 6480.66 -5498.25 3430.48 2.32 5953276.38 13193.19 98.92 115.77 8848.35 8928.05 6503.14 7444.21 6506.57 -5511.40 3458.32 3.72 5953263.65 13225.06 98.73 116.67 8843.46 8923.16 6530.46 7475.70 6533.40 -5525.31 3486.58 2.85 5953250.16 13257.27 98.74 115.42 8838.57 8918.27 6558.04 7507.54 6560.50 -5539.29 3515.18 3.84 5953236.61 13289.13 98.59 115.35 8833.77 8913.47 6585.13 7539.04 6587.17 -5552.79 3543.63 0.52 5953223.53 13320.90 97.91 117.01 8829.21 8908.91 6612.40 7570.48 6614.06 -5566.66 3571.85 5.60 5953210.08 13352.69 98.07 116.03 8824.79 8904.49 6639.80 7601.96 6641.13 -5580.72 3600.02 3.09 5953196.45 13384.22 97.71 116.78 8820.47 8900.17 6666.95 7633.19 6667.98 -5594.61 3627.99 2.62 5953182,98 13416.70 97.56 118.02 8816.15 8895.85 6695.20 7665.38 6695.98 -5609.42 3656.57 3.81 5953168.59 Last Survey 13430.21 97.80 117.10 8814.34 8894.04 6706.97 7678.77 6707.65 -5615.62 3668.44 6.98 5953162.58 TD (Projected) 13475.00 97.80 117.10 8808.27 8887.97 6745.81 7723.15 6746.22 -5635.83 3707.94 0.00 5953142.95 Survey Type: Definitive Survey NOTES: GYD CT DMS - (Gyrodata -cont. drillpipe m/s - -Gyrodata pump-down multishot surveys with continuou s tool (RGS-CT) in drill -pipe.) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is app lied to enhan ce inclination accuracy. ) Legal Descriation: Northing (Y) [ftUS] Eastin g (X) [ftUS] Surface : 3749 FSL 1455 FEL S21 T11 N R12E UM 5958722.52 611789.75 BHL : 3392 FSL 3040 FEL S27 Ti 1 N R12E UM 5953142.95 615580.78 614901.86 N 70 16 54.022 W 149 4 12.807 614931.06 N 70 16 53.891 W 149 411.962 614959.22 N 7016 53.763 W 149 4 11.148 614987.73 N 7016 53.632 W 149 4 10.323 615016.03 N 70 i 6 53.506 W 149 4 9.504 615044.66 N 70 16 53.378 W 149 4 8.676 615073.69 N 7016 53.244 W 149 4 7.836 615101.44 N 70 16 53.116 W 149 4 7.033 615130.04 N 7016 52.987 W 149 4 6.206 615158.75 N 70 16 52.853 W 149 4 5.376 615186.02 N 70 16 52.723 W 149 4 4.587 615215.20 N 7016 52.585 W 149 4 3.744 615243.72 N 70 16 52.451 W 149 4 2.919 615272.15 N 70 16 52.317 W 149 4 2.097 615301.32 N 7016 52.183 W 149 41.253 615329.36 N 70 16 52.054 W 149 4 0.442 615357.81 N 70 16 51.917 W 149 3 59.619 615386.61 N 7016 51.779 W 149 3 58.786 615415.26 N 7016 51.646 W 149 3 57.958 615443.68 N 70 i 6 51.510 W 149 3 57.136 615472.05 N 7016 51.371 W 149 3 56.316 615500.23 N 70 16 51.235 W 149 3 55.502 615529.02 N 70 16 51.089 W 149 3 54.669 615540.98 N 70 i 6 51.028 W 149 3 54.324 615580.78 N 7016 50.829 W 149 3 53.173 SurveyEditor Ver SP 2.1 Bld( doc40x_100) W-Spare\W-45\W-45\W-45 Generated 1 /1 8/2008 1 2:36 PM Page 6 of 6 gyrodata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 7 1 314 6 1-31 46 Fax: 713/461-0920 SURVEY REPORT BP W-Pad #W-45 Prudhoe Bay, AK AK4 707G_564 25 Nov 2007 ~~ ....~ ~~~ ~ ~,~~~~;Si g0~ P~~ ~tlrr91~E° ~~ _ . ~~~ Serving the Worldwide Energy Industry with Precision Survey Instrumentation a~ d~ -1 ~. ? • gyr data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713{461-3146 Fax: 713/467-0920 January 15, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: W-Pad, Well #W-45 Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we took forward to serving you in the future. Sincerely, ~~~~~~ Rob Shoup North American Regional Manager RS:kI Serving the Worldwide Energy Industry with Precision Survey Instrumentation A Gyrodata Directional Survey for BP EXPLORATION ALASKA INC. Lease: W-Pad Well: W-45, Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK1107G 564 Run Date: 25 Nov 2007 Surveyor: Rod Tucker Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.296220 deg. N Longitude: 149.094120 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP Exploration Alaska Inc. Lease: W-Pad Well: W-45 Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK1107G 564 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 O.OU N 0 - 1383.28 FT. RATE GYROSCOPIC MULTISHOT SURVEY. ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO NABORS #9 ES R.K.B. 100.00 0.10 85.04 N 85 3 E 0.10 200.00 0.13 38.75 N 38 45 E 0.10 300.00 0.06 240.93 S 60 56 W 0.19 400.00 0.46 223.22 S 43 13 W 0.41 500.00 0.79 227.41 S 47 25 W 0.32 600.00 1.04 228.11 S 48 7 W 0.26 700.00 0.92 227.81 S 47 49 W 0.13 800.00 1.44 74.09 N 74 5 E 2.29 900.00 2.49 77.67 N 77 40 E 1.06 1000.00 4.00 86.12 N 86 7 E 1.58 1100.00 6.45 101.30 S 78 42 E 2.79 1200.00 7.80 105.00 S 75 0 E 1.42 1300.00 9.49 113.94 S 66 4 E 2.15 1383.28 10.87 122.08 S 57 55 E 2.40 0.00 E -------------- 100.00 0.1 85.0 0.01 N 0.09 E 200.00 0.3 67.4 0.11 N 0.25 E 300.00 0.3 58.8 0.17 N 0.28 E 400.00 0.2 195.0 0.15 S 0.04W 499.99 1.2 222.1 0.91 S 0.82W 599.98 2.8 225.4 1.98 S 2.OOW 699.96 4.5 226.3 3.12 S 3.27W 799.96 4.3 218.7 3.32 S 2.66W 899.90 2.6 165.1 2.51 S 0.67 E 999.73 6.5 106.1 1'.81 S 6.27 E 1099.31 15.5 99.9 2.67 S 15.26 E 1198.54 27.9 101.4 5.53 S 27.32 E 1297.41 42.7 104.4 10.63 S 41.40 E 1379.38 57.1 107.9 17.59 S 54.33 E i Final Station Closure: Distance: 57.11 ft Az: 107.94 deg. BP Exploration Alaska Inc. Well: W-Pad W-45 Location: Nabors #9ES, Prudhoe Bay, Alaska 0 -2 -4 -6 .. w .. ~ -8 z ~. z -10 -1~ -14 -1E -1E Outrun Gyrodata AK1107G 564 DEFINITIVE I BOTTOM LOCATE HOLE i ~ • -5 0 5 lU 15 GU L5 .3u .s~ ~+u ~~ ~u ~~ FASTING (ft) BP Exploration Alaska Inc. Well: W-Pad W-45 Location: Nabors #9ES, Prudhoe Bay, Alaska 8 7 6 +~ 0 0 a~ ~5 v .., w ~4 w C7 w J 03 2 0 Outrun Gyrodata AK1107G_564 DEFINITIVE - - ~E- - OCATED D: 1383.28 I i i i i i i nn 4nn 50 0 800 10 00 1200 1400 ~J MEASURED DEPTH (ft) BP Exploration Alaska Inc. Well: W-Pad W-45 Location: Nabors #9ES, Prudhoe Bay, Alaska 74 72 70 68 .~. w ~ 66 w 64 w a w F- 62 60 58 56 54 Outrun Gyrodata AK1107G_564 DEFINITIVE B L TTOM HOLE CATED M :1383.28 X 00 40 0 6 00 800 1000 1200 1400 MEASURED DEPTH (ft) M SCHLUMBERGER Survey report Client .................... Field ..................... Well ...................... API number ...............: Engineer .................. Rig :...................... STATE :.................... ----- Survey calculation m Method for positions.....: Method for DLS...........: BP Exploration (Alaska) Inc. Prudhoe Bay W-45 50-029-23369-00 Minnick/Hart Nabors 9ES Alaska ethods------------- Minimum curvature Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 50.60 ft KB above permanent.......: N/A DF above permanent.......: 79.70 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 146.03 degrees [(c)2007 IDEAL ID12_OC_13] G v ?~-~ v 19-Dec-2007 15:52:49 Page 1 of 9 Spud date ................: 24-Nov-07 Last survey date.........: 18-Dec-07 Total accepted surveys...: 220 MD of first survey.......: 0.00 ft MD of last survey........: 13475.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2007 Magnetic date ............: 09-Dec-2007 Magnetic field strength..: 57644.49 LAMA Magnetic dec (+E/W-).....: 23.28 degrees Magnetic dip .............: 80.87 degrees ----- MWD survey Reference Reference G ............... Reference H ..............: Reference Dip ............: Tolerance of G...........: Tolerance of H...........: Tolerance of Dip.........: Criteria --------- 1002.68 meal 57644.50 LAMA 80.87 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.28 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.28 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • SCHLUNIBERGER Survey Report 19-Dec-2007 15:52:49 Page 2 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 105.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.10 85.04 100.00 100.00 0.04 0.01 0.09 0.09 85.04 0.10 BP _GYD_ CT_DMS 3 200.00 0.13 38.75 100.00 200.00 0.05 0.10 0.24 0.27 67.08 0.09 BP _GYD_ CT_DMS 4 300.00 0.06 240.93 100.00 300.00 0.01 0.17 0.27 0.32 58.34 0.19 BP _GYD_ CT_DMS 5 400.00 0.46 223.22 100.00 400.00 0.10 -0.15 -0.05 0.16 198.46 0.40 BP _GYD_ CT_DMS 6 500.00 0.79 227.41 100.00 499.99 0.29 -0.91 -0.83 1.23 222.46 0.33 BP _GYD_ CT_DM5 7 600.00 1.04 228.11 100.00 599.98 0.52 -1.98 -2.02 2.83 225.47 0.25 BP GYD CT DMS 8 700.00 0.92 227.81 100.00 699.96 0.76 -3.13 -3.29 4.54 226.41 0.12 BP _ _ _GYD_ _ CT_DMS 9 800.00 1.44 74.09 100.00 799.96 1.26 -3.32 -2.67 4.26 218.81 2.30 BP _GYD_ CT_DMS 10 900.00 2.49 77.67 100.00 899.90 2.45 -2.51 0.66 2.60 165.34 1.06 BP GYD CT DMS 11 1000.00 4.00 86.12 100.00 999.73 5.00 -1.81 6.26 6.52 106.16 1.58 BP _GYD_ CT_DMS 12 1100.00 6.45 101.30 100.00 1099.31 10.74 -2.68 15.25 15.48 99.96 2.79 BP GYD CT DMS 13 1200.00 7.80 105.00 100.00 1198.54 19.85 -5.54 27.31 27.87 101.46 1.43 BP _GYD CT DMS 14 1300.00 9.49 113.94 100.00 1297.41 31.96 -10.64 41.40 42.75 104.41 2.15 BP _GYD_ CT_DMS 15 1325.28 10.07 116.42 25.28 1322.32 35.64 -12.47 45.29 46.97 105.39 2.84 BP MWD IFR MS 16 1420.05 11.46 121.66 94.77 1415.42 51.42 -21.10 60.72 64.28 109.16 1.79 BP _MWD IFR MS 17 1515.83 12.61 129.20 95.78 1509.10 70.10 -32.70 76.92 83.59 113.03 2.03 BP _MWD_ IFR_MS 18 1610.93 13.31 138.07 95.10 1601.79 90.88 -47.41 92.29 103.75 117.19 2.21 BP _MWD_ IFR_MS 19 1707.32 13.32 146.29 96.39 1695.59 112.97 -64.90 105.86 124.17 121.51 1.96 BP _MWD_ IFR_MS 20 1803.66 14.41 156.53 96.34 1789.14 135.86 -85.13 116.80 144.53 126.09 2.78 BP MWD IFR MS 21 1898.32 18.54 167.67 94.66 1879.92 161.45 -110.65 124.71 166.72 131.58 5.47 BP _MWD IFR MS 22 1993.99 20.92 168.55 95.67 1969.96 191.37 -142.26 131.35 193.62 137.28 2.51 BP _MWD_ IFR_MS 23 2089.32 21.79 171.72 95.33 2058.75 223.04 -176.45 137.28 223.56 142.12 1.52 BP _MWD_ IFR_MS 24 2185.74 23.90 176.51 96.42 2147.61 256.01 -213.66 141.04 256.02 146.57- 2.92 BP _MWD_ IFR_MS 25 2281.70 28.23 178.54 95.96 2233.79 291.91 -255.77 142.81 292.94 150.82 4.61 BP MWD IFR MS 26 2376.65 29.13 178.07 94.95 2317.09 330.44 -301.32 144.16 334.03 154.43 0.98 BP _MWD_ IFR_MS 27 2472.02 30.53 176.59 95.37 2399.82 370.98 -348.70 146.38 378.18 157.23 1.66 BP _MWD_ IFR_MS 28 2568.48 31.64 175.05 96.46 2482.43 414.20 -398.37 150.02 425.68 159.36 1.42 BP MWD IFR MS 29 2664.88 34.23 175.33 96.40 2563.33 459.97 -450.59 154.41 476.31 161.08 2.69 BP _MWD_ IFR_MS 30 2760.18 34.53 174.10 95.30 2641.99 507.17 -504.17 159.37 528.76 162.46 0.79 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] SCHLUMBERGER Survey Report 19 -Dec-2007 15:52:49 Page 3 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2854.97 33.80 174.55 94.79 2720.42 554.05 -557.14 164.63 580.96 163.54 0.81 BP _MWD IFR MS 32 2951.40 33.48 173.61 96.43 2800.70 601.19 -610.28 170.14 633.55 164.42 0.63 BP _MWD_ IFR _MS 33 3047.40 33.21 173.95 96.00 2880.89 647.89 -662.74 175.86 685.67 165.14 0.34 BP _MWD IFR MS 34 3142.66 32.93 173.75 95.26 2960.72 693.86 -714.42 181.43 737.09 165.75 0.32 BP _MWD IFR MS 35 3238.52 32.41 173.03 95.86 3041.42 739.82 -765.82 187.38 788.41 166.25 0.68 BP MWD IFR MS 36 3333.41 31.96 173.88 94.89 3121.73 784.68 -816.03 193.14 838.58 166.68 0.67 BP _MWD_ IFR _MS 37 3429.00 31.62 173.22 95.59 3202.98 829.34 -866.07 198.80 888.59 167.07 0.51 BP MWD IFR MS 38 3525.53 31.41 173.79 96.53 3285.27 874.10 -916.20 204.51 938.75 167.42 0.38 BP _MWD_ IFR _MS 39 3581.32 31.24 173.83 55.79 3332.93 899.77 -945.04 207.64 967.58 167.61 0.31 BP MWD IFR MS 40 3711.91 30.54 173.25 130.59 3444.99 959.23 - 1011.65 215.18 1034.29 167.99 0.58 BP MWD IFR MS 41 3806.56 30.28 172.92 94.65 3526.62 1001.89 - 1059.22 220.94 1082.01 168.22 0.33 BP MWD IFR MS 42 3902.76 29.22 172.59 96.20 3610.14 1044.53 - 1106.57 226.96 1129.61 168.41 1.11 BP MWD IFR MS 43 3998.87 28.67 173.85 96.11 3694.25 1085.90 - 1152.76 232.46 1175.96 168.60 0.85 BP MWD IFR MS 44 4093.25 27.84 174.09 94.38 3777.38 1125.37 - 1197.19 237.15 1220.45 168.80 0.89 BP MWD IFR MS 45 4188.76 27.10 174.09 95.51 3862.12 1164.25 - 1241.01 241.69 1264.33 168.98 0.77 BP MWD IFR MS 46 4287.45 26.53 174.15 98.69 3950.20 1203.53 - 1285.30 246.25 1308.67 169.15 0.58 BP _MWD_ IFR _MS 47 4388.34 27.56 175.38 100.89 4040.05 1243.75 - 1330.98 250.43 1354.33 169.34 1.16 BP _MWD_ IFR _MS 48 4485.43 27.42 175.67 97.09 4126.18 1282.75 - 1375.66 253.92 1398.89 169.54 0.20 BP _MWD_ IFR _MS 49 4579.98 28.36 175.58 94.55 4209.75 1321.21 - 1419.76 257.30 1442.88 169.73 1.00 BP MWD IFR MS 50 4675.25 29.81 176.60 95.27 4293.00 1361.29 - 1465.96 260.45 1488.91 169.93 1.61 BP MWD IFR MS 51 4770.14 30.93 176.65 94.89 4374.87 1402.58 - 1513.85 263.27 1536.57 170.13 1.18 BP _MWD_ IFR _MS 52 4865.20 32.15 175.93 95.06 4455.89 1445.53 - 1563.47 266.49 1586.02 170.33 1.34 BP _MWD_ IFR _MS 53 54 4960.14 5055.83 32.67 33.27 175.90 176.33 94.94 95.69 4536.04 4616.32 1489.65 - 1534.71 - 1614.22 1666.18 270.12 273.64 1636.67 1688.50 170.50 170.67 0.55 0.67 BP BP _MWD_ _MWD_ IFR IFR _MS _MS • 55 5151.21 34.02 175.72 95.38 4695.72 1580.48 - 1718.89 277.31 1741.12 170.84 0.86 BP MWD IFR MS 56 5246.77 33.00 174.93 95.56 4775.40 1626.48 - 1771.47 281.60 1793.72 170.97 1.16 BP MWD IFR MS 57 5341.78 32.86 174.40 95.01 4855.14 1671.82 - 1822.90 286.41 1845.26 171.07 0.34 BP MWD IFR MS 58 5437.45 32.56 173.80 95.67 4935.64 1717.43 - 1874.32 291.72 1896.89 171.15 0.46 BP MWD IFR MS 59 5533.41 31.26 173.93 95.96 5017.10 1762.29 - 1924.75 297.14 1947.55 171.22 1.36 BP MWD IFR MS 60 5628.69 31.44 173.85 95.28 5098.47 1806.11 - 1974.04 302.42 1997.07 171.29 0.19 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] SCHLUMBERGER Survey Report 19 -Dec-2007 15:52:49 Page 4 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5724.82 31.04 174.15 96.13 5180.66 1850.14 -2023.62 307.63 2046.87 171.36 0.45 BP _MWD _IFR _MS 62 5820.83 29.86 173.35 96.01 5263.42 1893.21 -2071.99 312.92 2095.49 171.41 1.30 BP MWD IFR MS 63 5917.30 29.29 174.11 96.47 5347.33 1935.37 -2119.32 318.12 2143.06 171.46 0.71 BP _MWD _IFR _MS 64 6011.96 28.77 174.48 94.66 5430.09 1975.83 -2165.03 322.69 2188.94 171.52 0.58 BP _MWD_ IFR_ MS 65 6108.08 28.64 173.25 96.12 5514.40 2016.65 -2210.93 327.62 2235.07 171.57 0.63 BP MWD IFR MS 66 6203.01 28.16 172.94 94.93 5597.91 2056.86 -2255.75 333.05 2280.20 171.60 0.53 BP _MWD _IFR_ MS 67 6298.43 27.77 172.46 95.42 5682.18 2096.84 -2300.13 338.73 2324.94 171.62 0.47 BP MWD IFR MS 68 6394.24 27.15 172.48 95.81 5767.20 2136.40 -2343.93 344.52 2369.12 171.64 0.65 BP _ _MWD _ _ _IFR _MS • 69 6490.42 26.09 173.48 96.18 5853.18 2174.82 -2386.70 349.80 2412.20 171.66 1.20 BP _MWD IFR MS 70 6585.74 28.51 178.88 95.32 5937.89 2212.54 -2430.28 352.62 2455.73 171.74 3.63 BP MWD IFR MS 71 6679.94 30.78 180.54 94.20 6019.76 2251.29 -2476.87 352.84 2501.87 171.89 2.56 BP_MWD IFR MS 72 6777.59 30.29 180.23 97.65 6103.87 2292.25 -2526.48 352.50 2550.95 172.06 0.53 BP _MWD_ IFR_ MS 73 6872.97 29.05 178.51 95.38 6186.74 2331.68 -2573.69 353.01 2597.78 172.19 1.58 BP _MWD _IFR_ MS 74 6968.88 28.95 176.44 95.91 6270.63 2371.34 -2620.13 355.05 2644.08 172.28 1.05 BP _MWD_ IFR_ MS 75 7063.25 27.35 176.28 94.37 6353.83 2409.77 -2664.56 357.88 2688.49 172.35 1.70 BP MWD IFR MS 76 7160.23 29.47 172.53 96.98 6439.14 2450.37 -2710.46 362.43 2734.58 172.38 2.86 BP _MWD _IFR_ MS 77 7255.97 29.10 170.86 95.74 6522.64 2492.58 -2756.79 369.19 2781.40 172.37 0.94 BP MWD IFR MS 78 7352.16 26.29 172.14 96.19 6607.80 2532.94 -2801.00 375.82 2826.10 172.36 2.99 BP MWD IFR MS 79 7447.45 24.30 173.45 95.29 6693.95 2569.30 -2841.38 380.94 2866.81 172.36 2.17 BP MWD IFR MS 80 7542.88 24.02 172.14 95.43 6781.02 2604.17 -2880.13 385.84 2905.86 172.37 0.63 BP MWD IFR MS 81 7638.70 25.91 171.40 95.82 6867.89 2640.60 -2920.15 391.63 2946.30 172.36 2.00 BP MWD IFR MS 82 7733.84 26.12 170.78 95.14 6953.39 2678.40 -2961.38 398.10 2988.02 172.34 0.36 BP MWD IFR MS 83 7820.65 25.68 170.33 86.81 7031.48 2712.90 -2998.78 404.32 3025.92 172.32 0.56 BP _MWD _IFR_ MS 84 7910.83 28.08 172.48 90.18 7111.91 2749.71 -3039.09 410.38 3066.68 172.31 2.87 BP _MWD _IFR_ MS 85 8007.69 33.99 175.57 96.86 7194.87 2793.72 -3088.73 415.46 3116.55 172.34 6.32 BP MWD IFR MS 86 8103.17 33.64 175.69 95.48 7274.20 2839.92 -3141.72 419.51 3169.60 172.39 0.37 BP MWD IFR MS 87 8199.11 34.52 175.69 95.94 7353.67 2886.64 -3195.32 423.55 3223.27 172.45 0.92 BP _MWD _IFR_ MS 88 8294.24 36.87 173.46 95.13 7430.92 2935.40 -3250.57 428.83 3278.73 172.48 2.82 BP _MWD _IFR_ MS 89 8390.76 36.65 170.64 96.52 7508.25 2987.30 -3307.76 436.81 3336.48 172.48 1.76 BP _MWD _IFR_ MS 90 8486.71 36.71 172.59 95.95 7585.21 3038.99 -3364.46 445.17 3393.78 172.46 1.22 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - --- (ft) -------- (deg) ------ (deg) ------- (f t) ------ 91 8582.90 35.79 171.57 96.19 92 8678.62 34.67 172.49 95.72 93 8773.80 33.42 172.48 95.18 94 8871.23 31.75 172.93 97.43 95 8966.49 31.66 174.14 95.26 96 9062.34 32.38 173.76 95.85 97 9156.61 32.21 174.24 94.27 98 9252.49 33.83 174.09 95.88 99 9347.55 31.65 175.03 95.06 100 9443.06 30.80 173.56 95.51 101 9539.28 35.99 167.31 96.22 102 9634.16 39.39 163.68 94.88 103 9743.37 38.21 163.23 109.21 104 9776.03 40.77 160.37 32.66 105 9807.79 41.18 156.98 31.76 106 9838.91 42.34 150.90 31.12 107 9872.18 41.77 143.83 33.27 108 9902.61 42.26 138.43 30.43 109 9935.17 44.51 136.24 32.56 110 9967.30 44.97 132.23 32.13 111 9998.03 44.83 126.94 30.73 112 10030.56 44.73 123.33 32.53 113 10062.76 43.84 118.73 32.20 114 10094.94 44.18 118.88 32.18 115 10126.38 47.82 121.63 31.44 116 10158.14 51.76 123.74 31.76 117 10190.25 56.34 124.76 32.11 118 10221.78 61.26 124.24 31.53 119 10252.97 65.50 123.39 31.19 120 10285.92 70.03 123.38 32.95 19-Dec-2007 15:52:49 TVD Vertical Displ depth section +N/S- (ft) (ft) (ft) 7662.78 3090.08 -3420.79 7740.97 3139.71 -3475.47 7819.83 3187.42 -3528.30 7901.92 3234.30 -3580.34 7982.97 3278.71 -3630.09 8064.23 3323.61 -3680.62 8143.92 3368.09 -3730.71 8224.31 3414.17 -3782.69 8304.27 3459.34 -3833.86 8385.94 3502.94 -3883.13 8466.27 3551.18 -3935.24 8541.35 3605.86 -3991.35 8626.46 3671.15 -4056.95 8651.67 3691.14 -4076.67 8675.65 3711.45 -4096.06 8698.87 3731.96 -4114.66 8723.59 3754.21 -4133.40 8746.20 3774.49 -4149.24 8769.87 3796.59 -4165.68 8792.69 3818.72 -4181.45 8814.47 3839.51 -4195.26 8837.56 3860.91 -4208.45 8860.62 3881.28 -4220.03 8883.77 3901.16 -4230.81 8905.60 3921.53 -4242.21 8926.10 3943.79 -4255.32 8944.95 3967.93 -4269.95 8961.28 3993.01 -4285.22 8975.25 4018.81 -4300.73 8987.72 4046.95 -4317.51 Displ +E/W- (ft) 453.00 460.66 467.63 474.29 479.93 485.29 490.56 495.87 500.75 505.67 514.65 529.24 548.72 555.22 562.80 571.90 583.90 596.67 611.83 628.03 644.74 663.47 682.72 702.31 721.83 742.23 763.71 785.93 809.10 834.56 Page Total displ (ft) 3450.66 3505.87 3559.15 3611.62 3661.67 3712.48 3762.83 3815.05 3866.43 3915.91 3968.75 4026.28 4093.89 4114.30 4134.54 4154.21 4174.44 4191.93 4210.37 4228.35 4244.52 4260.42 4274.90 4288.70 4303.19 4319.56 4337.71 4356.69 4376.17 4397.42 5 of At Azim (deg) 172.46 172.45 172.45 172.45 172.47 172.49 172.51 172.53 172.56 172.58 172.55 172.45 172.30 172.24 172.18 172.09 171.96 171.82 171.64 171.46 171.26 171.04 170.81 170.57 170.34 170.11 169.86 169.61 169.35 169.06 9 DLS (deg/ 100f) 1.14 1.29 1.31 1.73 0.67 0.78 0.33 1.69 2.35 1.20 6.47 4.28 1.11 9.61 7.12 13.53 14.33 11.98 8.31 8.90 12.16 7.82 10.35 1.11 13.18 13.40 14.49 15.67 13.81 13.75 Srvy Tool tool Corr type (deg) BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD IFR MS BP MWD IFR MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS BP_MWD_IFR_MS • U [(c)2007 IDEAL ID12_OC_13] SCHLUMBERGER Survey Report 19 -Dec-2007 15:52:49 Page 6 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 121 10317.94 73.89 122.64 32.02 8997.63 4074.97 -4334.09 860.08 4418.60 168.78 12.25 BP _MWD _IFR_ MS 122 10348.99 76.64 121.62 31.05 9005.53 4102.42 -4350.06 885.51 4439.27 168.49 9.41 BP _MWD _IFR_ MS 123 10381.66 81.23 120.74 32.67 9011.79 4131.50 -4366.65 912.94 4461.06 168.19 14.30 BP _MWD_ IFR_ MS 124 10413.16 85.93 118.80 31.50 9015.32 4159.57 -4382.18 940.10 4481.89 167.89 16.13 BP _M[n7D_ IFR_ MS 125 10444.10 90.50 118.72 30.94 9016.28 4187.05 -4397.06 967.20 4502.18 167.59 14.77 BP _MWD_ IFR_ MS 126 10475.92 94.87 119.04 31.82 9014.79 4215.32 -4412.41 995.03 4523.21 167.29 13.77 BP _MWD_ IFR_ MS 127 10515.96 100.82 118.18 40.04 9009.33 4250.52 -4431.39 1029.83 4549.48 166.92 15.01 BP _MWD _IFR_ MS 128 10547.80 101.10 118.01 31.84 9003.27 4278.13 -4446.11 1057.41 4570.13 166.62 1.02 BP _MWD _IFR_ MS 129 10578.28 100.79 118.17 30.48 8997.49 4304.57 -4460.21 1083.81 4590.00 166.34 1.14 BP _MWD _IFR_ MS 130 10610.15 100.63 119.61 31.87 8991.56 4332.44 -4475.33 1111.23 4611.23 166.06 4.47 BP _MWD _IFR_ MS 131 10643.60 99.61 118.05 33.45 8985.69 4361.72 -4491.21 1140.07 4633.65 165.76 5.51 BP _MWD_ IFR_ MS 132 10674.97 96.00 118.57 31.37 8981.43 4389.23 -4505.95 1167.43 4654.73 165.47 11.62 BP _MWD_ IFR_ MS 133 10705.95 94.76 119.29 30.98 8978.52 4416.69 -4520.87 1194.42 4675.99 165.20 4.62 BP _MWD_ IFR_ MS 134 10737.12 93.45 118.82 31.17 8976.29 4444.39 -4535.97 1221.60 4697.59 164.93 4.46 BP _MWD_ IFR_ MS 135 10770.01 92.15 116.09 32.89 8974.68 4473.24 -4551.11 1250.75 4719.85 164.63 9.18 BP _MWD_ IFR_ MS 136 10801.20 92.01 113.56 31.19 8973.55 4499.90 -4564.20 1279.04 4740.02 164.35 8.12 BP _MWD _IFR_ MS 137 10833.00 90.30 112.08 31.80 8972.91 4526.50 -4576.53 1308.34 4759.87 164.05 7.11 BP _MWD IFR MS 138 10865.24 89.31 111.72 32.24 8973.02 4553.18 -4588.55 1338.25 4779.72 163.74 3.27 BP _MWD IFR MS 139 10896.47 89.64 111.95 31.23 8973.31 4579.01 -4600.17 1367.24 4799.05 163.45 1.29 BP _MWD IFR MS 140 10927.52 90.33 111.25 31.05 8973.31 4604.62 -4611.60 1396.11 4818.29 163.16 3.17 BP MWD IFR MS 141 10960.24 92.66 111.26 32.72 8972.46 4631.49 -4623.45 1426.59 4838.54 162.85 7.12 BP _MWD_ IFR_ MS 142 10992.74 93.49 109.86 32.50 8970.72 4657.92 -4634.85 1456.98 4858.46 162.55 5.00 BP _MWD IFR MS 143 144 11025.40 11057.04 93.39 93.32 109.60 110.28 32.66 31.64 8968.76 8966.91 4684.19 4709.72 -4645.86 -4656.63 1487.66 1517.36 4878.23 4897.61 162.24 161.95 0.85 2.16 BP BP _MWD _MWD _IFR_ _IFR_ MS MS • 145 11088.88 93.04 109.36 31.84 8965.14 4735.37 -4667.41 1547.26 4917.18 161.66 3.02 BP MWD IFR MS 146 11120.19 92.24 109.91 31.31 8963.70 4760.54 -4677.92 1576.72 4936.49 161.37 3.10 BP _MWD _IFR _MS 147 11151.81 92.00 110.00 31.62 8962.53 4786.08 -4688.70 1606.42 4956.26 161.09 0.81 BP _MWD _IFR _MS 148 11183.84 91.80 109.78 32.03 8961.47 4811.93 -4699.59 1636.52 4976.38 160.80 0.93 BP _MWD _IFR_ MS 149 11216.53 91.88 111.42 32.69 8960.42 4838.56 -4711.09 1667.11 4997.36 160.51 5.02 BP _MWD _IFR_ MS 150 11248.10 91.67 111.16 31.57 8959.44 4864.49 -4722.54 1696.51 5018.02 160.24 1.06 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] SCHLUMBERGER Survey Report 19-Dec-2007 15:52:49 Page 7 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course ------- TVD - -------- Vertical ------- Displ --------- Displ -------- Total ------- At ----- DLS ----- Srvy ------ Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 11280.52 90.99 110.64 32.42 8958.69 4890.99 -4734.10 1726.79 5039.20 159.96 2.64 BP MWD IFR _MS 152 11312.19 90.15 110.78 31.67 8958.37 4916.83 -4745.30 1756.41 5059.93 159.69 2.69 BP MWD IFR MS 153 11344.05 90.04 111.72 31.86 8958.32 4943.00 -4756.85 1786.10 5081.12 159.42 2.97 BP_ MWD _IFR _MS 154 11376.17 91.57 112.72 32.12 8957.87 4969.69 -4769.00 1815.83 5103.00 159.16 5.69 BP_ MWD _IFR _MS 155 11408.18 94.83 111.38 32.01 8956.08 4996.18 -4780.99 1845.45 5124.80 158.89 11.01 BP MWD IFR MS 156 11439.97 95.27 111.53 31.79 8953.28 5022.26 -4792.58 1874.92 5146.27 158.63 1.46 BP_ MWD IFR MS 157 11472.58 94.82 112.12 32.61 8950.41 5049.12 -4804.65 1905.08 5168.56 158.37 2.27 BP MWD IFR MS 158 11503.22 94.79 111.57 30.64 8947.85 5074.38 -4816.01 1933.42 5189.61 158.13 1.79 _ BP_ MWD _ _IFR _ _MS 159 11535.75 94.01 111.77 32.53 8945.35 5101.15 -4827.99 1963.56 5212.01 157.87 2.47 BP MWD IFR _MS 160 11567.90 93.66 113.13 32.15 8943.20 5127.88 -4840.24 1993.21 5234.58 157.62 4.36 BP MWD IFR MS 161 11599.85 92.29 112.36 31.95 8941.54 5154.55 -4852.58 2022.63 5257.23 157.37 4.92 BP_ MWD _IFR_ MS 162 11631.82 90.71 112.75 31.97 8940.71 5181.21 -4864.83 2052.14 5279.95 157.13 5.09 BP_ MWD _IFR_ MS 163 11663.88 90.61 114.27 32.06 8940.34 5208.24 -4877.62 2081.54 5303.21 156.89 4.75 BP_ MWD _IFR_ MS 164 11695.73 90.31 114.50 31.85 8940.08 5235.35 -4890.77 2110.55 5326.73 156.66 1.19 BP_ MWD _IFR_ MS 165 11727.82 90.49 114.91 32.09 8939.86 5262.76 -4904.18 2139.70 5350.64 156.43 1.40 BP MWD IFR MS 166 11760.08 91.40 115.09 32.26 8939.32 5290.40 -4917.81 2168.93 5374.86 156.20 2.88 BP MWD IFR_ MS 167 11790.86 90.26 114.72 30.78 8938.88 5316.75 -4930.77 2196.85 5398.02 155.99 3.89 BP MWD IFR MS 168 11822.26 88.34 116.87 31.40 8939.26 5343.87 -4944.44 2225.11 5422.04 155.77 9.18 BP MWD IFR MS 169 11855.29 85.32 115.76 33.03 8941.09 5372.51 -4959.05 2254.67 5447.55 155.55 9.74 BP_ MWD IFR MS 170 11887.02 81.41 116.74 31.73 8944.75 5399.86 -4972.99 2282.93 5471.96 155.34 12.70 BP MWD IFR MS 171 11918.46 81.07 115.98 31.44 8949.54 5426.86 -4986.79 2310.77 5496.15 155.14 2.62 BP MWD IFR MS 172 11950.31 80.76 116.81 31.85 8954.57 5454.19 -5000.77 2338.95 5520.72 154.93 2.75 BP MWD IFR MS 173 11982.97 82.01 115.18 32.66 8959.46 5482.15 -.5014.92 2367.97 5545.87 154.72 6.24 BP_ MWD _IFR _MS 174 12013.58 82.02 115.84 30.61 8963.72 5508.26 -5027.97 2395.33 5569.39 154.53 2.14 BP_ N1WD _IFR _MS 175 12045.79 83.60 115.24 32.21 8967.75 5535.80 -5041.75 2424.16 5594.27 154.32 5.24 BP MWD IFR MS 176 12077.45 84.53 114.30 31.66 8971.02 5562.72 -5054.94 2452.75 5618.58 154.12 4.17 BP_ MWD _IFR_ MS 177 12109.46 83.83 114.98 32.01 8974.27 5589.90 -5068.22 2481.70 5643.20 153.91 3.04 BP_ MWD _IFR _MS 178 12141.38 84.63 114.88 31.92 8977.48 5617.09 -5081.61 2510.50 5667.92 153.71 2.53 BP MWD IFR MS 179 12172.82 84.13 115.11 31.44 8980.55 5643.90 -5094.83 2538.86 5692.37 153.51 1.75 BP_ MWD _IFR _MS 180 12205.01 84.26 114.51 32.19 8983.81 5671.29 -5108.27 2567.92 5717.40 153.31 1.90 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] 5CHLUMBERGER Survey Report 19 -Dec-2007 15:52:49 Page 8 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 12236.74 83.82 114.95 31.73 8987.11 5698.25 - 5121.47 2596.59 5742.10 153.11 1.96 BP _MWD_ IFR_ MS 182 12269.10 84.05 114.92 32.36 8990.52 5725.81 - 5135.03 2625.77 5767.43 152.92 0.72 BP _MWD_ IFR_ MS 183 12300.85 83.02 114.21 31.75 8994.10 5752.72 - 5148.15 2654.46 5792.20 152.72 3.93 BP _MWD_ IFR_ MS 184 12332.29 82.41 112.29 31.44 8998.09 5778.94 - 5160.46 2683.11 5816.31 152.53 6.36 BP _MWD_ IFR_ MS 185 12365.62 83.13 112.49 33.33 9002.28 5806.46 - 5173.05 2713.68 5841.62 152.32 2.24 BP _MWD_ IFR_ MS 186 12396.92 83.06 112.63 31.30 9006.04 5832.38 - 5184.97 2742.38 5865.54 152.13 0.50 BP MWD IFR MS 187 12428.58 83.20 113.21 31.66 9009.83 5858.71 - 5197.22 2771.33 5889.93 151.93 1.87 BP MWD IFR MS 188 12459.55 84.10 114.63 30.97 9013.26 5884.78 - 5209.70 2799.47 5914.21 151.75 5.40 BP _ _ _MWD_ _ IFR_ MS 189 12491.91 87.31 113.66 32.36 9015.68 5912.18 - 5222.89 2828.91 5939.81 151.56 10.36 BP _MWD_ IFR_ MS 190 12524.80 87.38 112.72 32.89 9017.20 5939.78 - 5235.83 2859.11 5965.60 151.36 2.86 BP MWD IFR MS 191 12555.34 86.18 113.94 30.54 9018.92 5965.44 - 5247.91 2887.10 5989.65 151.18 5.60 BP MWD IFR MS 192 12586.98 87.48 113.10 31.64 9020.67 5992.08 - 5260.51 2916.07 6014.69 151.00 4.89 BP MWD IFR MS 193 12618.43 89.40 113.09 31.45 9021.53 6018.47 - 5272.84 2944.99 6039.52 150.82 6.11 BP MWD IFR MS 194 12651.16 91.05 113.53 32.73 9021.40 6046.00 - 5285.79 2975.05 6065.52 150.63 5.22 BP MWD IFR MS 195 12683.56 94.08 113.49 32.40 9019.95 6073.29 - 5298.70 3004.72 6091.36 150.44 9.35 BP MWD IFR MS 196 12715.38 96.58 114.03 31.82 9016.99 6100.08 - 5311.47 3033.72 6116.79 150.27 8.04 BP MWD IFR MS 197 12747.59 99.18 115.14 32.21 9012.57 6127.29 - 5324.74 3062.73 6142.73 150.09 8.76 BP MWD IFR MS 198 12778.95 101.19 114.90 31.36 9007.03 6153.75 - 5337.79 3090.70 6168.02 149.93 6.45 BP _MWD IFR MS 199 12810.86 101.97 115.22 31.91 9000.62 6180.55 - 5351.03 3119.01 6193.69 149.76 2.63 BP _M[n]D_ IFR_ MS 200 12842.48 102.36 113.90 31.62 8993.96 6206.91 - 5363.88 3147.13 6218.97 149.60 4.26 BP MWD IFR MS 201 12874.49 102.07 115.30 32.01 8987.19 6233.61 - 5376.91 3175.57 6244.63 149.43 4.37 BP MWD IFR MS 202 12907.10 102.08 115.28 32.61 8980.37 6261.02 - 5390.53 3204.40 6271.04 149.27 0.07 BP MWD IFR MS 203 12938.23 101.87 114.99 31.13 8973.91 6287.15 - 5403.46 3231.97 6296.27 149.12 1.13 BP _MWD_ IFR_ MS 204 12970.22 101.77 114.79 31.99 8967.35 6313.95 - 5416.64 3260.38 6322.19 148.96 0.69 BP _MWD_ IFR_ MS . 205 13002.44 100.94 116.13 32.22 8961.01 6341.15 - 5430.22 3288.90 6348.55 148.80 4.82 BP MWD IFR MS 206 13033.12 100.68 115.94 30.68 8955.26 6367.25 -5443.45 3315.97 6373.92 148.65 1.04 BP MWD IFR_ MS 207 13065.82 100.23 115.49 32.70 8949.32 6395.01 -5457.40 3344.95 6400.93 148.50 1.93 BP _MWD_ IFR_ MS 208 13097.74 99.67 115.94 31.92 8943.81 6422.15 -5471.04 3373.27 6427.39 148.34 2.24 BP _MWD_ IFR_ MS 209 13129.53 99.67 115.52 31.79 8938.47 6449.20 -5484.65 3401.50 6453.80 148.19 1.30 BP _MWD_ IFR_ MS 210 13161.99 99.53 114.77 32.46 8933.05 6476.67 -5498.25 3430.48 6480.65 148.04 2.32 BP MWD IFR MS [(c)2007 IDEAL ID12_OC_13] SCHLLTMBERGER Survey Report 19 -Dec-2007 15:52:49 Page 9 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 13193.19 98.92 115.77 31.20 8928.05 6503.13 - 5511.39 3458.32 6506.57 147.89 3.72 BP_MWD_ IFR_MS 212 13225.06 98.73 116.67 31.87 8923.16 6530.46 - 5525.31 3486.58 6533.39 147.75 2.85 BP_MWD_ IFR_MS 213 13257.27 98.74 115.42 32.21 8918.27 6558.03 - 5539.29 3515.18 6560.50 147.60 3.84 BP_MWD_ IFR_MS 214 13289.13 98.59 115.35 31.86 8913.47 6585.13 - 5552.79 3543.63 6587.17 147.46 0.52 BP_MWD_ IFR_MS 215 13320.90 97.91 117.01 31.77 8908.91 6612.40 - 5566.66 3571.85 6614.06 147.31 5.60 BP MWD IFR MS 216 13352.69 98.07 116.03 31.79 8904.49 6639.80 - 5580.72 3600.02 6641.12 147.17 3.09 BP_MWD_ IFR_MS 217 13384.22 97.71 116.78 31.53 8900.17 6666.95 - 5594.60 3627.99 6667.98 147.04 2.62 BP MWD IFR MS 218 13416.70 97.56 118.02 32.48 8895.85 6695:20 - 5609.42 3656.57 6695.98 146.90 3.81 BP_MWD_ IFR_MS 219 13430.21 97.80 117.10 13.51 8894.04 6706.97 - 5615.61 3668.44 6707.65 146.85 6.98 BP_MWD_ IFR_MS 220 13475.00 97.80 117.10 44.79 8887.96 6745.81 - 5635.83 3707.94 6746.22 146.66 0.00 Projected to TD [(c)2007 IDEAL ID12_OC_13] i Schlumaer er 9 Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC) Well No W-45 Date Dispatched: 22-Dec-07 Installation/Rig Nabors 9ES Dispatched By: Franklin Medina LWD Log DeliveryV2.1, 03-06-06 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Johnson Received By: ~ , 9, BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) i`'V~ v~ 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojhC~?hp.com ~~, 7 -/ ~7 W-45 Surface LOT implication: • Maunder, Thomas E (DOA) From: Staudinger, Mark [Mark.Staudinger@bp.com] Sent: Friday, November 30, 2007 7:32 AM To: Maunder, Thomas E (DOA) Cc: aogcc_prudhoe_bay@admin.state.ak.us Subject: RE: W-45 (207-127) Surface LOT implications ~~/~ Page 1 of 2 FYI- Last night we were able to latch into the TAM collar and pull 15k Ibs to shift it close. After this we got a good LOT to 14.21 ppg. We are currently drilling ahead in our intermediate section. Thanks, Mark Staudinger From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, November 29, 2007 4:20 PM To: Staudinger, Mark Cc: aogcc prudhoe_bay@admin.state.ak.us Subject: RE: W-45 (207-127) Surface LOT implications Mark, Thanks for the informs#ion. As discussed, I don't remember a surface shoe squeeze in a long time. Did the casing test satisfactorily prior to drill out? It would appear that the plans forward are prudent. As you noted, some additional hole may be drilled however not more than the 50' of new hole allowed by the regulations. Keep us informed. Tom Maunder, PE AOGCC From: Staudinger, Mark [maitto:Mark.Staudinger@bp.com] Sent: Thursday, November 29, 2007 4:15 PM To: Maunder, Thomas E (DOA) Subject: W-45 Surface LOT implications Tom- Just wanted to give you a heads up: We are having problems achieving our desired LOT for W-45. Currently we are only able to get a LOT of 9.7 to 9.9 ppg outside of the surface casing shoe. We have inspected the surface equipment and everything seems to check out. There are no anticipated faults at our shoe. We suspect it may be the TAM collar and are currently running in the hole with a TAM shifting tool to attempt to re-shift the collar closed. If this fails we will pick up an RTTS and attempt to isolate any leaks in the casing/TAM collar. Finally, if no leaks are found, we attempt a cement squeeze on the shoe to isolate any loss zone. This is just a heads up on our operations. The cement job wouldn't be until tomorrow, so if you need anymore details I would be happy to give them to you. Thanks, 11/30/2007 W-45 Surface LOT implications Maunder, Thomas E (DOA) From: Staudinger, Mark [Mark.Staudinger@bp.com] Sent: Thursday, November 29, 2007 5:02 PM To: Maunder, Thomas E (DOA) Cc: aogcc prudhoe_bay@admin.state.ak.us Subject: RE: W-45 (207-127) Surface LOT implications Tom- We got a good casing test to 3500 psi far 30 minutes. I'll keep you updated on events. Thanks, Mark From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, November 29, 2007 4:20 PM To: Staudinger, Mark Cc: aogcc_prudhoe bay@admin.state.ak.us Subject: RE: W-45 (207-127) Surface LOT implications Page 1 of 2 Mark, Thanks for the information. As discussed, I don't remember a surface shoe squeeze in a long time. Did the casing test satisfactorily prior to drill out? It would appear that the plans forward are prudent. As you noted, some additional hole may be drilled however not more than the 50' of new hole allowed by the regulations. Keep us informed. Tom Maunder, PE AOGCC From: Staudinger, Mark [mailto:Mark.Staudinger@bp.com] Sent: Thursday, November 29, 2007 4:15 PM To: Maunder, Thomas E (DOA) Subject: W-45 Surface LOT implications Tom- Just wanted to give you a heads up: We are having problems achieving our desired LOT for W-45. Currently we are only able to get a LOT of 9.7 to 9.9 ppg outside of the surface casing shoe. We have inspected the surface equipment and everything seems to check out. There are no anticipated faults at our shoe. We suspect it may be the TAM collar and are currently running in the hale with a TAM shifting tool to attempt to re-shift the collar closed. tf this fails we wilt pick up an RTTS and attempt to isolate any teaks in the casing/TAM collar. Finally, if no leaks are found, we attempt a cement squeeze on the shoe to isolate any foss zone. This is just a heads upon our operations. The cement job wouldn't be until tomorrow, so if you need anymore details I would be happy to give them to you. Thanks, Mark Staudinger 11/30/2007 W-45 Permit to Drill Question Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Tuesday, November 20, 2007 2:16 PM To: 'Staudinger, Mark' Subject: RE: W-45 (207-127) Permit to Drill Question Page 1 of 1 Mark, I have examined the permit. 3500 psi is the maximum pressure test planned and the MASP is calculated at 2774 psi. Reducing the BOP test pressure to 3500 psi is acceptable. Tom Maunder, PE AOGCC From: Staudinger, Mark [mailto:Mark.Staudinger@bp.com] Sent: Tuesday, November 20, 2007 1:42 PM To: Maunder, Thomas E (DOA) Subject: W-45 Permit to DriN Question Tom- In the Permit to Drill for W-45 I accidently wrote in the Well Control section that we would test BOP's to 4000 psi. However, since this is a producer, we only need to test casing and tubing to 3500 psi. 1 would like to request that our BOP tests be changed from 4000 psi to 3500 psi on the Rams, and remain at 2500 psi on the Annular Preventer. Please let me know as soon as possible. Thanks, Mark Staudinger BP Exploration Alaska GPB Rotary Drilling (907) 564-4337 (907) 440-7403 cell 11/20!2007 SARAH PAL/N GOV ~~ ERNOR ~L4'1-7~ OiTj oasjl ~ 333 W. 7th AVENUE, SUITE 100 CORSC' RQA~`I011T COMMISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Senior Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, W-45 BP Exploration Alaska, Inc. Permit No: 207-127 Surface Location: 3761' FSL, 1454' FEL, SEC. 21, T11N, R12E, UM Bottomhole Location: 1902' FNL, 2339' FWL, SEC. 28, T11N, R12E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness required test, contact the Commission's petroleum field inspefte~l,~ (90 65 -3607 (pager). N DATED this ~F~day of October, 2007 cc: Department of Fish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 ~~leS EP Q 7 2007 ,pia: ~~ t~ii &~ Gas Cans. Calnmission 1 a. Type of work ® Drill ^ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is propo ~a98 ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: W-45 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 13775 TVD 8890 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 3761' FSL 1454' FEL SEC 21 T11N R12E UM (Planned) 7. Property Designation: ADL 047452 Pool , , . , , , Top of Productive Horizon: 282' FNL, 914' FEL, SEC. 28, T11 N, R12E, UM 8. Land Use Permit: 13. Approximate Spud Date: November 15, 2007 Total Depth: 1902' FNL, 2339' FWL, SEC. 28, T11N, R12E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 11,000' 4b. Location of Well (State Base Plane Coordinates): Surface: x-611790 y-5958734 Zone-ASP4 10. KB Elevation Plan (Height above GL): 79.7 feet 15. Distance to Nearest Well Within Pool: 750' 16. Deviated Wells: Kickoff Depth: 800 feet Maximum Hole An le: 99.4 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3666 Surface: 2774 18. Gasin Pr ram:. S ecifications rTo - i3ttin _De th - Bo tt m uanti of meet c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 42" 20" 215.5# A-53 Weld 80' Surface Surface 80' 80' 260 sx Arctic Set A rox. 12-1/4" 9-5/8" 40# L-80 BTC 3413' Surface Surface 3413' 3310' 640 sx Dee Crete sx Class'G' 8-3/4" 7" 26# L-80 TC-II 4780' Surface Surface 4780' 4600' See Bel w ~ ~ 8-3/4" 7" 26# L-80 BTC-M 5138' 4780' 4600' 9918' 8580' sx LiteCrete 99 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr VT 4007' 9768' 8474' 13775' 8890' sx Class'G' 19. PRESE NT WELL CONDITION SUMMARY (To be completed forRedrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing.;: Length Size Cement Volume - MD ' TVD Conductor /Structural Surface Intermediate Proutin Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report (~ Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commi sion Representative: Date: 22. I hereby certify that th or going is true and correct. Contact Mark Staudinger, 564-4337 Printed Name Gre Title Senior Drilling Engineer Prepared By Name/Number: Si nature Phone 564-4191 Date `~ Terrie Hubble, 56a-4628 Commission Use Oni Permit To Drill + Number: o?O~fo?,?O API Number. 5o-Oo?9 .x,336 9 oGa~o Permit Approval See cover letter for Date: other re uirements Conditions of Approval: / ~QOt If box is check well may notebe used to explore for, test, or produce coalbed meths e, gas hyd s, or gas contained shales: Q~ P~wUVCt MGy`[i~ RtMip-JE~\~SV~`~c.-et hp~Cc LIU~yptes Req'd: ^ Ye o Mud Log Req'd: ^ es (~J No 1''l~k~Sa~AAOr~~.cs~ ProQosE c~ ~ \ ` HZS Measures: e ^ o Tonal Survey Req'd: ~es ^ No Other: 1"~VvOrDS~1 ~.7V~ {~C5 TC~-`~ p `v.`nl~~ `` APPROVED BY THE COMMISSION Date ~D~l~ ~ d ~ ,COMMISSIONER Form 10-401 Revised 12/2005 l./ S it I,n, D~u licate .i~sG~~~l v~ Well Name: W-45 Drill and Complete Plan Summary Ty a of Well (service /producer / in'ector : Horizontal Producer Target X Y Z TVDss Township Range Section FSL FEL Surface Location 611790 5958734 -79.7 11 N 12E 21 3760 1455 T t 1: TSGR 612400 5954700 8500 11 N 12E 28 4997 914 T t 2: Crv 8/100 612870 5954340 8925 11 N 12E 28 4631 450 T t 3: TSAD 613150 5954200 8890 11 N 12E 28 4487 173 T t 4: TSAD 614120 5953800 8870 11 N 12E 27 4072 4489 T t 5: TSAD 614825 5953575 8940 11 N 12E 27 3836 3788 T t 6: TSAD 615430 5953270 8840 11 N 12E 27 3522 3188 BHL 615680 5953130 8810 11 N 12E 27 3378 2941 AFE Number: PBD4P2682 API Number: TBD Estimated Start Date: Nov. 15, 2007 Operating days: 44.5 Rig: Nabors 7ES TMD 13,775' TVD rkb: 8,890' RKB/GL 28.5'/51.2' RTE 79.7' Well Design: USH Grassroots Ivishak Zone 3 and 4 Horizontal Producer. 4-'/z" 13-Cr Vam To com letion. Current Status: New drill, Conductor installed General Well Information: Estimated BHP: 3731 psi at 8810' TVDss Estimated BHT: 220 deg F at 8810' TVDss Formation Markers: Est. Formation Tops Uncertainty Commercial Hydrocarbon Bearing Est. Pore Press. Est. Pore Press. F' OYYIZCItlOl2 (TVDss) (feet) (Yes/No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -295 +/-30' No 133 8.7 SV6 -1180 +/-30' No 531 8.7 EOCU -1740 +/-30' No 783 8.7 SV5 -1820 +/-30' No 819 8.7 BPRF -1840 +/-30' Gas H drates 828 8.7 SV4 -1955 +/-30' Gas H drates 880 8.7 SV3 -2460 +/-30' Gas h drates 1107 8.7 SV2 -2660 +/-30' Poss. Free Gas or Gas H drates 1197 8.7 SVl -2980 +/-30' Poss. Free Gas or Gas H drates 1341 8.7 UG4 -3330 +/-30' Thin Coal 1499 8.7 W-45 Permit to Drill Application Page 1 G4A 3365 /-30' Yes -Heavy Oil (3365'- 3450' SS) 1517 (but could be lower due to W-400 source well offtake) 8.7 (but could be lower due to W-400 source well offCake) UG3 -3725 +/-30' Thin coals; traces of Heavy Oil 1676 8.7 UG1 -4180 +/-50' No 1881 8.7 UG_Ma -4520 +/-30' No 2034 8.7 UG_Mb1 -4570 +/-30' No 2057 8.7 UG_Mb2 -4610 +/-30' No 2075 8.7 UG_MC -4710 +/-30' Possible Heavy oil 2120 8.7 SB_Na -4770 +/-30' No 2147 8.7 SB_Nb -4795 +/-30' No 2] 58 8.7 SB_OA -4930 +/-30' No 2219 8.7 SB OBa -4985 +/-30' No 2243 8.7 SB_OBb -5025 +/-30' No 2261 8.7 SB_OBc -5055 +/-30' No 2275 8.7 SB_OBd -5110 +/-30' No 2300 8.7 SB_OBe -5180 +/-30' No 2331 8.7 SB OBf -5225 +/-30' No 2351 8.7 SB_OBf_Base -5265 +/-30' No 2369 8.7 Fault #1 -6020 +/-100' CM-1 -6155 +/-30' No TLBK -6310 +/-30' No THRZ -6510 +/-30' No TKLB -6800 +/-30' TKC4 NP +/-50' No NP NP LCU -6810 +/-30' No TMLV -6810 +/-30' No TKNG -7300 +/-30' Fault #2 -7480 +/-150' TJ F -7625 +/-30' No TJ E -7760 +/-30' TJ D -8005 +/-30' TJC -8205 +/-50' TJ B -8330 +/-30' TJA -8410 +/-30' TSGR -8500 +/-30' Yes 3600 8.1 TSHUA -8520 +/-30' TSHUB -8565 +/-30' TSHUC -8590 +/-30' TSHUD -8610 +/-30' TEIL -8620 +/-30' TSAD -8650 +/-30' Yes 3545.75 7.9 45P -8720 +/-30' Yes 3570.25 7.9 44P -8755 +/-30' Yes 3582.5 7.9 43P -8780 +/-30' Yes 3591.25 7.9 42P -8805 +/-30' Yes 3600 7.9 W-45 Permit to Drill Application Page 2 r: 41 P -8840 +/-30' Yes 3612.25 7.9 31 P -8890 +/-30' Yes 3629.75 7.9 INVERT -8925 +/-30' Yes 3642 7.8 31 P -8895 +/-30' Yes 3652.5 7.9 Fault #3 -8880 +/-30' Yes 3657.75 7.9 41 P -8875 +/-30' Yes 3659.5 7.9 REVERT / 42P -8870 +/-30' Yes 3661.25 7.9 41 P -8905 +/-30' Yes 3673.5 7.9 Fault #4 / 31 P -8920 +/-30' Yes 3678.75 7.9 INVERT -8940 +/-30' Yes 3685.75 7.9 31 P -8905 +/-30' Yes 3698 8.0 41 P -8870 +/-30' Yes 3710.25 8.0 42P -8845 +/-30' Yes 3719 8.1 TD -8810 +/-30' Yes 3731.25 8.1 Casinq/Tubinq Program: Hole Size Csg/ Tbg O.D. Wt/Ft Grade Connection Length (ft) Top MD/TVD RTE (ft) Btm MD/TVD RTE (ft) 42" Insulated 20" 215.5 A-53 WLD 80 GL 108/108 12-'/a" 9-5/8" 40 L-80 BTC 3413 GL 3413/3310 8-3/a" 7" 26 L-80 TC-li 4780 GL 4780/4600 8-3/a" 7" 26 L-80 BTC-M 5138 4780/4600 9918/8580 6-'/8" 4-~/z" 12.6 13-Cr VT 4007 9768/8474 13775/8890 Tubin 4-Yz" 12.6 13-Cr VT 9768 GL 9768/8474 Directional: Directional Plan: Schlumber er P6b KOP: 800' MD, be in 1.5/100 build Close A roach Wells: All Wells ass Ma~or Risk Scan, reference P6 anti-collision re ort Surve Pro ram: MWD + IFR + MS Maximum Hole An le: 99.4 de rees from 12943' to 13463' MD of Production Hole Distance to Nearest Pro ert Line: 11,000' from PBU Boundar Distance to Nearest Well in Pool: 750' from W-39A at heel; 1040' from W-06A at toe (TD); well will cross under W-42 GCWI with 120' of vertical se aration Mud Program: 12-'/a" Surface Hole Mud Properties Spud -Freshwater Mud Interval Density PV YP PH Funn Vis FL 0-1940' BPRF 8.8-9.2 20-45 50 - 70 9.0 - 9.5 300+ NC - 8 1940'-3413' SV1 9.0-9.5 20-45 45 - 60 9.0 - 9.5 250-300+ < 7.5 8-s/a" Intermediate Hole Mud Properties Freshwater Mud (LSND) Interval Density PV YP PH API Filtrate MBT 3413'-6927' THRZ 8.8-9.2 12-18 20 - 26 9.0-9.5 4 - 7 < 15 6927'-9918' TSGR 11.2 14-22 18 - 25 9.0-9.5 HTHP < 10 < 20 6-'/a" Production Hole Mud Pro erties FloPro-SF Interval Density PV YP PH HTHP @235° LG Solids 9918'-13775' TSAD) 8.5 5-8 22-32 8.5-9.0 < 8 <3 W-45 Permit to Drill Application Page 3 Survev and Loaaina Program: 12-'/a" Hole Section: Surface Gyro until MW D surveys are clean. MWD /LWD: Dir/GR Open Hole: None Cased hole: None 8-3/a" Hole Section: Sample as required by well site Geologist MWD /LWD: GR/RES/PWD real time O en Hole: None Cased Hole: USIT 6-'/e" Hole Section: Sample as required by well site Geologist MWD /LWD: GR/RES/NEU/DEN O en Hole: None Cased Hole: None Cement Calculations: Casing Size Surface Casing - 9 5/$" 40 Ib/ft L-80 BTC -Single Stage Basis Lead: Open hole volume + 250% excess in permafrost and 40% excess below permafrost. TOC at surface Tail: O en hole volume + 40% excess + 80' shoe track. TOC 1000' MD above shoe (2413' MD) Fluid Sequence and Tam Port collar located at 1,000' as a contingency for cement to surface Volume: Wash None S acer 100 bbls of MudPush II wei hted to 10.0 Lead 422 bbls 640 sks 10.7 Ib/ al Dee CRETE cement - 3.70 cuft/sk Tail 85 bbls ks 15.8 Ib/ al Class G - 1.15 cuft/sk ~ rec e..tia:~ ~'l Temp BHST = 90° F from SOR, BHCT 64° F Casing Size Intermediate Casing - 7" 26 Ib/ft L-80 BTC-M x TC-II -Single Stage Basis Lead: Open hole volume + 30% excess. TOC 500' above Ma (4280' MD) Tail: O en hole volume + 30% excess + 80' shoe track. TOC 500' MD above shoe 9418' MD Fluid Sequence and Volume: Wash None 3 acer 70 bbl of MUDPUSH XL S acer wei hted to 11.6-Ib/ al fo ~ Lead 174 bbl sks 12.5 LiteCRETE + Latex - cuft/sk E~ ~~~ Tail 20.5 bbl (99 sksl 15.8 aaa Class G cement + Latex + Silica - 1.16 cuft/sk I Temp I BHST ~ 238° F for first stage Casing Size Production Liner - 4-~/2" 12.6 Iblft 13-Cr Vam Top -Single Stage Basis Lead: Open hole volume + 30% excess + 150' of liner lap + 80' shoe track + 200' of 7" x 4" DP annulus volume. TOC at liner top (9768' MD) Total Cement Volume: Wash None S acer 40 bbls of Mud ush II Wei hted to 13 Tail 92.6 bbls sks 15.8 Ib/ al Class G C ment + Silica + Latex - cuft/sk ~lt-l e~Qr..a. ~r'1 , t Temp BHST = 238° F from SOR, HCT 160° F estimated bV Dowell W-45 Permit to Drill Application Page 4 Surface and Anti-Collision Issues: • Surface Shut-in Wells: W-42 and W-44 will need to be shut-in and have well houses removed for the rig move on and off W-45. • Close Approach Shut-in Wells: All wells have passed the major risk scan. No wells will require subsurface shut-in during drilling operations. Reference the Anti-collision report in the directional plan for a full list of offset well paths. W-45 Permit to Drill Application Page 5 i ~- Well Control Surface hole will be drilled with a diverter. The intermediate and production hole sections will be drilled with well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer. This equipment is capable of handling maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. Due to anticipated surface pressures not exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. Diverter, BOPE and drilling fluid sy Surface Section • BOPE: • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 9-5/8" Casing Test: • Kick Tolerance: stem schematics on file with the AOGCC. Hydril GK, 21-1/4", 2000 psi 1,461 psi -base SV1 (8.7 ppg EMW @ 3230' TVDss} 1138 psi -Based on a full column of gas @ 0.10 psi/ft Diverter Function Test 3,500 psi surface pressure test NA Intermediate Section Kick Tolerance and Integrity Testing • BOPE: Hydril, 13-5/8", 5000 psi • Maximum anticipated BHP: 3,580 psi -Top Sag River (8.1 ppg EMW @ 8500' TVDss) • Maximum surface pressure: 2,730 psi -Based on a full column of gas @ 0.10 psi/ft • Planned BOP test pressure: 3,500 psi/250 psi Rams and 2,500 psi/250 psi Annular °~1t, •~~y31~' Casing Test: 3,500 psi surface pressure test l Integrity Test - 8-3/4" hole: LOT 20' - 50' from 9-5/8" shoe • Kick Tolerance: 139.0 bbl KT with a 11.2 ppg mud and a 11.8. ppg LOT Production Section Kick Tolerance and Intearity Testin • BOPE: Hydril, 13-5/8", 5000 psi • Maximum anticipated BHP: 3,666 psi - Ivishak Tgt 2 (7.9 ppg @ 8925' TVDss) • Maximum surface pressure: 2,774 psi -Based on a full column of gas @ 0.10 psi/ft • Planned BOP test pressure: 3,500 psi/250 psi Rams and 2,500 psi/250 psi Annular • 4'/z" Casing Test: 3,500 psi surface pressure test • Integrity Test - 6-'/B" hole: FIT 20' - 50' from 7" shoe • Kick Tolerance: Calculated an Infinite KT with a 8.5 ppg mud with 10.5 ppg FIT • Planned completion fluid: Estimated 8.7 ppg Brine / 6.8 ppg Diesel Variance Request • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, i it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Disposal • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for disposal. Haul all Class I wastes to Pad 3 for disposal. W-45 Permit to Drill Application Page 6 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control /Reservoir Pressures: The Schrader Bluff sands are expected to be pressured at 8.7 ppg EMW. There is no Kuparuk sand expected in this well, but if present pressures would range from 9.8 - 10.0 ppg EMW. The Ivishak is expected to be pressured at 7.9 -8.1 ppg EMW. II. Hydrates and Shallow gas: Gas Hydrates are expected at W-pad near the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation /Breathing: Lost circulation is considered low to moderate at the faults in the intermediate section, and the LCM tree for non-pay zone sections should be followed if losses occur. Lost circulation is considered moderate to high in the production hole sections. The LCM tree for solid liners should be followed if losses occur. The Shublik phenomenon could occur on this well, however all lessons learned have been applied within the plan to mitigate this potential. Follow the RP guidelines for dealing with it if it occurs. IV. Kick Tolerance /Integrity Testing: Intermediate Section Kick Tolerance and Integrity Testing • Integrity Test - 8-3/4" hole: LOT 20' - 50' from 9 5/8" shoe • Kick Tolerance: 139.0 bbl KT with a 11.2 ppg mud and a 11.8 ppg LOT Production Section Kick Tolerance and Integrity Testing • Integrity Test - 6-'/8" hole: FIT 20' - 50' from 7" shoe • Kick Tolerance: Calculated an Infinite KT with a 8.5 ppg mud with 10.5 ppg FIT V. Stuck Pipe There could be slight differential sticking across the open hole while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide W Pad is not designated as an H2S site, however Standard Operating Procedures for HzS precautions should be followed at all times. H2S levels across the pad are typically in the 10 to 30 ppm range based on the latest samples taken. VII. Faults There is a low to moderate risk of losses incurred when crossing faults #1 and #2 in the intermediate section. There is a moderate to high risk of losses incurred when crossing faults #3 and #4 in the production section. Formation Where Encounter Fault MD Intersect TVDSS Intersect Est. Throw Throw Direction Uncertaint Fault #1 -Above CM1 6370 -6020 130' Southwest +/- 100' MD Fault #2 -Above TJF 8475 -7480 70' West +/- 150' MD Fault #3 -Ivishak Horizontal section 11700 -8875 20' East +/- 150' MD Fault #4 -Ivishak Horizontal section 12500 -8910 30' West +/- 150' MD CONSULT THE W PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION W-45 Permit to Drill Application Page 7 W-45 Drill and Complete Operations Summary Pre-Rig Work: 1. Seta 20" conductor and weld a 13-3/8" hanger (contingency casing) butt-weld sub and landing ring for the USH Gen 5 well head. 2. If necessary, level the pad and prepare location for rig move. 3. Prepare neighboring wells for the rig move and sim-ops production. Shut in nearby wells, bleed off process lines, and remove well houses as necessary. Rig Operations: 1. MIRU Nabors 7ES. NU diverter spool & riser and function test. PU 4" DP as required and stand back in derrick. 2. MU 12 ~/a" drilling assembly with MWD/GR and directionally drill surface hole to TD at 3434' md. The TD will be approximately 260' below the top of the SV1. An intermediate wiper/bit trip will be planned at the BPRF and hole conditions will be evaluated at this time. 3. Run and cement the 9-5/8', 40#, L-80, BTC surface casing back to surface. Have a TAM collar on location if hole conditions warrant. Test the 9 5/8" casing to 3,500 psi for 30 minutes. 4. ND diverter and riser. NU casing head and test. NU BOPE and test to 3,500 psi. PU 4" DP as needed. 5. MU 8-3/a" drilling BHA with MWD / GR /RES / PWD and RIH to float collar. 6. Drill out shoe track. Circulate and condition mud. Displace well to new 8.8 ppg LSND drilling fluid. Drill 20' of new formation below rat-hole and perform a LOT. Establish a clean hole PW D ECD baseline. a. Note: Notify ODE if a 11.8 ppg LOT is not obtained. 7. Drill to +/-100' and above the HRZ, ensure mud is in condition to 11.1 ppg and perform short trip as needed. During this time hold the pre-reservoir meeting highlighting kick tolerance and detection. 8. Directionally drill ahead keeping mud weight up to 11.1 ppg through Miluveach and Kingak and continue drilling to TD maintaining sail angle & direction to the Top SAG at 9925' md. POOH. Stand back 4" DP. 9. MU and run 7" 26# L-80 BTC-m x TC-II long string casing to TD. Cement with single stage job to 500' MD above the Ma. Test the 7" casing to 3,500 psi for 30 minutes at plug bump. Confirm appropriate cement compressive strength prior to freeze protecting. Freeze protect the 7" x 9 5/8" annulus w/ diesel to 2,500' TVD. a. Note: Ensure intermediate casing pup below the hanger is Baker-ok'd to the hanger if threads are BTC-M. 10. PU 6-'/" drilling BHA with MWD / GR /RES / NEU /DEN and RIH to bottom. 11. Drill out shoe track. Circulate and condition mud. Displace well to new 8.5 ppg Flo-Pro SF fluid. Drill 20' of new formation below rat hole and perform an FIT to 10.5 ppg EMW. 12. Drill the 11 deg/100' DLS build section, and continue geo-steering through Zone 3 and 4 to TD at 13775' md. Perform wiper trip if needed, circulate and condition mud and POH. Lay down excess drill pipe. 13. MU and run 4-~/z" 12.6# 13-Chrome VT solid liner to TD and cement (ensure 150' overlap). Bump plug with perf pill. PU off liner hanger and circulate and condition mud. Displace over to 8.7 ppg brine. 14. PU 2.875" PAC and 2.5" 4 spf PJ Omega tapered perforation assembly and perf 500' of liner in overbalance. POH, LD per guns. 15. MU and run the 4-'/z" 12.6#, 13-Chrome, VT completion. Circulate corrosion inhibited brine down the back side and land tubing hanger. 16. Run in the lockdown screws. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. ,G~'r0~'the AOGCC 24 hrs notice prior to testing. Shear DCR valve and pump both ways to confirm circulation ability. ~.~~ 17. Install TWC and test from below to 1,000 psi. ND the BOPE. NU and test the tree and hanger pack-off to 5,000 psi. 18. Pull TWC. Freeze protect the well to 2,500 ft TVD by pumping 90 bbls of diesel down the IA with Hot Oiler taking clean brine returns. Allow the diesel to U-tube through the tree. 19. Install BPV in tubing hanger. Install a VR plug in the 7" x 4-1/2" annulus valve and secure the well. Assure that IA/OA are both protected with two barriers. 20. Rig down /move off Nabors 7ES. W-45 Permit to Drill Application Page 8 Post-Rig Work: 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Replace the DCR shear valve with a gas list valve. 3. Pull dummy valves in GLM's and replace with gas lift valves, per PE's recommendation. 4. Pull VR Plug. 5. Replace well houses as necessary. W-45 Permit to Drill Application Page 9 ACTUATOR= Hydraulic KB. ELEV = 28.5 BF. ELEV = xxx KOP = 800' Max Angle = 99.39°/12943' Datum MD = xxxx' Datum ND = xxxx' 9-5/8" CSG, 40#, L-80, ID= 8.835" ~~ 3413' 7" CSG, 26#, L-80, TG11, .0383 bpf, ID = 6.276" ~ 4780' Minimum ID = 3.725" XN Nipples 4-1/2" 13-Cr, 12.6 Ib/ft, VT, ID= 3.958" i 9768' 4.5" WLEG, ID= 3.958" 9768' 7" CSG, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" I--j 9918' PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: xx° Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2.5" 4 Opn wELLHEAD= 4-1/16" ~ prop#d Completion W-45 SA NOTES: 1000' I9-5/8" TAM Port Collar - IF RUN 2240' 4-112" HES X Nippple , ID= 3.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 8 2448' 2400' KBG-2 1" 7 3492' 3385' KBG-2 1" 6 4462' 4300' KBG-2 1" 5 5574' 5350' KBG-2 DCR-1 1" 4 6264' 6000' KBG-2 1" 3 6937' 6600' KBG-2 1" 2 8533' 7600' KBG-2 1 " 1 9677' 8410' KBG-2 1" "I 9688' H 4-1/2" X Nipple (3.813" ID) I 9708' Baker Premier Packer, 7" x 4.5" 9728 4-1/2" X Nipple (3.813" ID) 9748' 4-1/2" XN Nipple (3.725" ID) 9768' 5" x 7" Liner top Packer w / Tieback Sleeve PBTD H 13735' I 4-1 /2", 13-Cr, 12.6#, V T ~ DATE REV BY COMMENTS DATE REV BY COMMENTS 09/06/07 MIS Proposed Completion Rev.1 13775' I PRUDHOE BAY UNfT WELL: W-45 PERMrf No: xxxxx API No: 50-029-xxxxx Sec Tw p Rge BP Exploration (Alaska) W-45 (P6b) Proposal Schlumherger Report Date: August 27, 2007 Survey I DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 146.030° Field: Prudhoe Bay Unit - WOA < ~ r ~ ~, / Vertical Section Origin: ~ i N 0.000 ft, E 0.000 ft Structure I Slot: W-PAD I W-Spare ® ~ ~ i ~C ~i" - 11, i` ND Reference Datum: ;~ ~ Rotary Table Well: Plan W-45 r ~ ~ ~ ~'. ~ 0) G 1~ ~ TVD Reference Elevation: 79.70 ft relative to MSL Borehole: Plan W-45 _ ~ ~ ~ ~ Sea Bed 1 Ground Level Elevation: 51.20 ft relative to MSL UWIIAPI#: 50029 Magnetic Declination: 23.283° Survey Name I Date: W-45 (P6b) I August 27, 2007 Total Field Strength: 57644.276 nT Tort I AHD 1 DDI I ERD ratio: 210.038° 17805.69 ft 16.399 / 0.865 Magnetic Dip: 80.868° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December O5, 2007 Location LatlLong: N 70.29618498, W 149.09476939 Magnetic Declination Model: BGGM 2007 location Grid NIE YIX: N 5958722.520 ftUS, E 611789.750 ftUS North Reference: True North Grid Convergence Angle: +0.85223572° Total Corr Mag North -> True North: +23.283° Grid Scale Factor: 0.99991420 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Gravity DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS KIE U.UU U.UU ~uo.uu -ry.ru U.UU U.UU U.UU u.uu --- V.uu u.uu oaoar«.o~ niiraa.ro rvru.~yoio4ao vv i4y.vyvioyoy G1 374.70 0.00 105.00 295.00 374.70 0.00 0.00 0.00 --- 0.00 0.00 5958722.52 611789.75 N 70.29618498 W 149.09476939 KOP Bld 1.5/100 800.00 0.00 105.00 720.30 800.00 0.00 0.00 0.00 HS 0.00 0.00 5958722.52 611789.75 N 70.29618498 W 149.09476939 Bld 2/100 900.00 1.50 105.00 820.29 899.99 0.99 -0.34 1.26 HS 1.50 0.29 5958722.20 611791.02 N 70.29618405 W 149.09475915 1000.00 3.50 105.00 920.19 999.89 4.28 -1.47 5.48 HS 2.00 1.30 5958721.13 611795.25 N 70.29618097 W 149.09472504 1100.00 5.50 105.00 1019.87 1099.57 10.20 -3.50 13.06 HS 2.00 1.87 5958719.22 611802.86 N 70.29617542 W 149.09466368 1200.00 7.50 105.00 1119.23 1198.93 18.74 -6.43 23.99 HS 2.00 2.27 5958716.45 611813.83 N 70.29616742 W 149.09457515 SV6 1261.39 8.73 105.00 1180.00 1259.70 25.27 -8.67 32.36 HS 2.00 2.47 5958714.33 611822.23 N 70.29616129 W 149.09450739 Crv 3/100 1300.00 9.50 105.00 1218.12 1297.82 29.89 -10.25 38.27 98.90R 2.00 2.58 5958712.84 611828.16 N 70.29615697 W 149.09445956 1400.00 9.51 123.25 1316.77 1396.47 43.73 -16.92 53.15 80.90R 3.00 2.85 5958706.40 611843.14 N 70.29613876 W 149.09433909 1500.00 10.41 139.87 1415.29 1494.99 60.32 -28.35 65.87 64.52R 3.00 3.06 5958695.15 611856.03 N 70.29610752 W 149.094 1600.00 12.00 153.00 1513.39 1593.09 79.63 -44.53 76.42 51.64R 3.00 3.24 5958679.14 611866.81 N 70.29606334 W 149.0941 1700.00 14.06 162.73 1610.83 1690.53 101.59 -65.39 84.75 42.16R 3.00 3.40 5958658.40 611875.45 N 70.29600632 W 149.09408325 1800.00 16.40 169.87 1707.31 1787.01 126.14 -90.90 90.84 35.26R 3.00 3.54 5958632.99 611881.92 N 70.29593664 W 149.09403394 EOCU 1834.15 17.25 171.87 1740.00 1819.70 135.11 -100.66 92.40 33.36R 3.00 3.59 5958623.25 611883.63 N 70.29590998 W 149.09402128 1900.00 18.93 175.22 1802.60 1882.30 153.23 -120.97 94.67 30.17R 3.00 3.68 5958602.98 611886.20 N 70.29585449 W 149.09400289 End Crv 1915.21 19.33 175.91 1816.97 1896.67 157.56 -125.94 95.06 --- 3.00 3.70 5958598.02 611886.66 N 70.29584091 W 149.09399977 SV5 1918.42 19.33 175.91 1820.00 1899.70 158.48 -127.00 95.13 --- 0.00 3.70 5958596.96 611886.75 N 70.29583801 W 149.09399916 Base Perm 1939.62 19.33 175.91 1840.00 1919.70 164.57 -134,00 95.63 --- 0.00 3.72 5958589.97 611887.36 N 70.29581890 W 149.09399511 SV4 2061.49 19.33 175.91 1955.00 2034.70 199.54 -174:23 98.51 --- 0.00 3.80 5958549.79 611890.83 N 70.29570899 W 149.09397183 SV3 2596.65 19.33 175.91 2460.00 2539.70 353.11 -350.90 111.14 --- 0.00 4.06 5958373.34 611906.08 N 70.29522634 W 149.09386961 SV2 2808.59 19.33 175.91 2660.00 2739.70 413.93 -420.87 116.14 --- 0.00 4.13 5958303.46 611912.12 N 70.29503519 W 149.09382912 WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-Spare\Plan W-45\Plan W-45\W-45 (P6b) Generated 8/27/2007 1:19 PM Page 1 of 4 Measured Vertical Gravity Directional Comments Inclination Azimuth Sub-SeaTVD ND NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS JV7 374/./U 7`1.33 7/b. `J7 [ytfU.UU 3U0`J. /U 577.[5 -5.1[.21[ 7[4.74 --- U.VU 4.L3 O`JOtfly7.05 b77`JL7./y IV /U.L`J4/L`J3b VV 74y.Uy3/b435 9-5/8" Csg Pf 3412.63 19.33 175.91 3230.00 3309. 70 587.27 -620.28 130.39 --- 0.00 4.29 5958104.31 611929.34 N 70.29449043 W 149.09371375 UG4 3518.61 19.33 175.91 3330.00 3409. 70 617.68 -655.26 132.89 --- 0.00 4.31 5958069.37 611932.36 N 70.29439485 W 149.09369351 UG4A 3555.70 19.33 175.91 3365.00 3444. 70 628.33 -667.50 133.77 --- 0.00 4.32 5958057.14 611933.42 N 70.29436140 W 149.09368642 UG3 3937.20 19.33 175.91 3725.00 3804. 70 737.80 -793.45 142.77 --- 0.00 4.39 5957931.35 611944.29 N 70.29401734 W 149.09361356 UG1 4419.37 19.33 175.91 4180.00 4259. 70 876.17 -952.62 154.15 --- 0.00 4.46 5957772.38 611958.04 N70.29358248 W149.09352147 Ma 4779.68 19.33 175.91 4520.00 4599. 70 979.57 -1071.57 162.65 --- 0.00 4.51 5957653.58 611968.31 N 70.29325753 W 149.09345266 Mb1 4832.66 19.33 175.91 4570.00 4649. 70 994.77 -1089.06 163.90 --- 0.00 4.52 5957636.11 611969.82 N 70.29320974 W 149.09344254 Mb2 4875.05 19.33 175.91 4610.00 4689. 70 1006.94 -1103.05 164.90 --- 0.00 4.53 5957622.14 611971.02 N 70.29317151 W 149.09343445 Mc 4981.02 19.33 175.91 4710.00 4789. 70 1037.35 -1138.04 167.40 --- 0.00 4.54 5957587.20 611974.05 N 70.29307594 W 149.09341421 Na 5044.61 19.33 175.91 4770.00 4849. 70 1055.59 -1159.03 168.90 --- 0.00 4.55 5957566.23 611975.86 N 70.29301860 W 149.09 Mb 5071.10 19.33 175.91 4795.00 4874. 70 1063.20 -1167.77 169.53 --- 0.00 4.55 5957557.50 611976.61 3 N 70.29299470 W 149.093 OA 5214.16 19.33 175.91 4930.00 5009. 70 1104.25 -1215.00 172.90 --- 0.00 4.57 5957510.33 611980.69 N 70.29286568 W 149.09336968 OBa 5272.45 19.33 175.91 4985.00 5064. 70 1120.98 -1234.24 174.28 --- 0.00 4.57 5957491.11 611982.35 N 70.29281311 W 149.09335855 OBb 5314.84 19.33 175.91 5025.00 5104. 70 1133.14 -1248.24 175.28 --- 0.00 4.58 5957477.14 611983.56 N 70.29277488 W 149.09335046 OBc 5346.63 19.33 175.91 5055.00 5134. 70 1142.26 -1258.73 176.03 --- 0.00 4.58 5957466.66 611984.47 N 70.29274621 W 149.09334439 OBd 5404.91 19.33 175.91 5110.00 5189. 70 1158.99 -1277.97 177.41 --- 0.00 4.59 5957447.44 611986.13 N 70.29269365 W 149.09333326 OBe 5479.09 19.33 175.91 5180.00 5259. 70 1180.28 -1302.46 179.16 --- 0.00 4.60 5957422.98 611988.24 N 70.29262674 W 149.09331909 OBf 5526.78 19.33 175.91 5225.00 5304. 70 1193.96 -1318.20 180.28 --- 0.00 4.60 5957407.26 611989.60 N 70.29258374 W 149.09330999 OBf Base 5569.17 19.33 175.91 5265.00 5344. 70 1206.12 -1332.20 181.28 --- 0.00 4.61 5957393.28 611990.81 N 70.29254551 W 149.09330189 Fault Crossing 6369.26 19.33 175.91 6020.00 6099. 70 1435.72 -1596.33 200.16 --- 0.00 4.68 5957129.49 612013.61 N 70.29182393 W 149.09314911 Crv 4/100 6437.73 19.33 175.91 6084.61 6164. 31 1455.37 -1618.93 201.78 5.67R 0.00 4.69 5957106.91 612015.57 N 70.29176218 W 149.09313603 6500.00 21.81 176.57 6142.91 6222. 61 1474.27 -1640.76 203.20 5.05R 4.00 4.73 5957085.11 612017.32 N 70.29170255 W 149.09312449 CM1 6513.05 22.33 176.69 6155.00 6234. 70 1478.49 -1645.65 203.49 4.94R 4.00 4.74 5957080.22 612017.68 N 70.29168918 W 149.09312217 6600.00 25.79 177.38 6234.38 6314. 08 1508.86 -1681.05 205.31 4.31 R 4.00 4.80 5957044.86 612020.02 N 70.29159247 W 149.09310747 TLBK 6685.26 29.20 177.91 6310.00 6389. 70 1542.37 -1720.37 206.92 3.84R 4.00 4.85 5957005.57 612022.21 N 70.29148505 W 149.09309447 6700.00 29.78 177.99 6322.83 6402. 53 1548.53 -1727.62 207.18 3.78R 4.00 4.86 5956998.32 612022.58 N 70.29146523 W 149.09309237 6800.00 33.78 178.46 6407.82 6487. 52 1593.08 -1780.25 208.80 3.37R 4.00 4.91 5956945.72 612024.98 N 70.29132145 W 149.09307927 6900.00 37.77 178.84 6488.94 6568. 64 1642.31 -1838.68 210.16 3.06R 4.00 4.97 5956887.33 612027.21 N 70.29116182 W 149.093 THRZ 6926.84 38.84 178.94 6510.00 6589. 70 1656.28 -1855.32 210.48 2.99R 4.00 4.98 5956870.70 612027.78 N 70.29111639 W 149.0930 7000.00 41.76 179.16 6565.79 6645. 49 1695.95 -1902.63 211.26 2.81 R 4.00 5.02 5956823.41 612029.27 N 70.29098713 W 149.09305931 7100.00 45.76 179.44 6638.00 6717. 70 1753.77 -1971.78 212.10 2.62R 4.00 5.07 5956754.29 612031.13 N 70.29079822 W 149.09305255 7200.00 49.76 179.68 6705.21 6784. 91 1815.47 -2045.79 212.67 2.46R 4.00 5.11 5956680.30 612032.80 N 70.29059602 W 149.09304799 7300.00 53.75 179.89 6767.10 6846. 80 1880.75 -2124.31 212.96 2.32R 4.00 5.16 5956601.80 612034.26 N 70.29038151 W 149.09304564 End Crv 7356.22 56.00 180.00 6799.44 6879. 14 1918.90 -2170.29 213.00 --- 4.00 5.19 5956555.83 612034.99. N 70.29025590 W 149.09304530 Kup Tgt / Crv 4/100 7357.22 56.00 180.00 6800.00 6879. 70 1919.59 -2171.12 213.00 HS 0.00 5.19 5956555.00 612035.00 N 70.29025364 W 149.09304530 TKLB 7357.23 56.00 180.00 6800.01 6879. 71 1919.60 -2171.13 213.00 HS 4.00 5.19 5956554.99 612035.00 N 70.29025360 W 149.09304530 TMLV/LCU 7375.27 56.72 180.00 6810.00 6889. 70 1932.06 -2186.15 213.00 HS 4.00 5.20 5956539.97 612035.22 N70.29021258 W149.09304530 7400.00 57.71 180.00 6823.39 6903 .09 1949.30 -2206.94 213.00 HS 4.00 5.21 5956519.19 612035.53 N 70.29015578 W 149.09304530 End Crv 7403.32 57.84 180.00 6825.16 6904 .86 1951.63 -2209.75 213.00 --- 4.00 5.21 5956516.38 612035.58 N 70.29014810 W 149.09304530 WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-Spare\Plan W-45\Plan W-45\W-45 (P6b) Generated 8/27/2007 1:19 PM Page 2 of 4 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Gravity DLS Directional Northing Easting Latitude longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS Grv4/1UU //y'I.y'L 5/.254 125U .UU /U31 .y25 /lTl.b25 ZZZ4 .425 -Zb325 ./4 Ll3.UL 143.UDL U.UU 0.Lt5 b`Jbb123/ .40 blLV4U .47 IV /V .La7L4y33 VV 14y .Uy3U4JLl 7800.00 57 .59 179 .77 7036 .30 7116 .00 2230 .15 -2545 .57 213.04 142.92E 4.00 5.28 5956180 .62 612040 .60 N 70.28923066 W 149 .09304510 7900.00 54 .43 176 .80 7092 .21 7171 .91 2300 .23 -2628 .42 215.48 141.26E 4.00 5.32 5956097 .83 612044 .28 N 70.28900433 W 149 .09302535 8000.00 51 .35 173 .60 7152 .55 7232 .25 2369 .82 -2707 .86 222.10 139.33E 4.00 5.36 5956018 .50 612052 .08 N 70 .28878729 W 149 .09297175 8100.00 48 .37 170 .11 7217 .02 7296. 72 2438 .58 -2783 .52 232.88 137.08E 4.00 5.40 5955943. 02 612063 .98 N 70 .28858061 W 149 .09288456 8200.00 45 .50 166 .29 7285 .31 7365. 01 2506 .18 -2855 .01 247.75 134.47E 4.00 5.43 5955871. 76 612079 .92 N 70 .28838530 W 149 .09276419 End Crv 8217.91 45 .00 165 .57 7297 .92 7377. 62 2518 .14 -2867 .35 250.85 --- 4.00 5.44 5955859. 47 612083 .19 N 70 .28835159 W 149 .09273917 TKNG 8220.86 45. 00 165. 57 7300. 00 7379. 70 2520. 10 -2869. 36 251.36 --- 0.00 5.44 5955857. 47 612083. 74 N 70. 28834608 W 149. 09273498 Fault Crossing 8475.41 45. 00 165. 57 7480. 00 7559. 70 2689. 73 -3043. 68 296.22 --- 0.00 5.46 5955683. 85 612131. 18 N 70. 28786984 W 149. 09237199 TJF 8680.47 45. 00 165. 57 7625. 00 7704. 70 2826. 38 -3184. 11 332.35 --- 0.00 5.49 5955543. 99 612169. 39 N 70. 28748621 W 149. 09207961 TJE 8871.39 45. 00 165. 57 7760. 00 7839. 70 2953. 61 -3314. 85 365.99 --- 0.00 5.51 5955413. 77 612204. 97 N 70. 28712903 W 149. 0918 TJD 9217.88 45. 00 165. 57 8005. 00 8084. 70 3184. 50 -3552. 12 427.05 --- 0.00 5.54 5955177. 45 612269. 54 N 70. 28648081 W 149. 0913 TJC 9500.72 45. 00 165. 57 8205. 00 8284. 70 3372. 98 -3745. 81 476.89 --- 0.00 5.57 5954984. 54 612322. 25 N 70. 28595166 W 149 .09091016 TJB 9677.50 45. 00 165. 57 8330. 00 8409. 70 3490. 78 -3866. 87 508.04 --- 0.00 5.58 5954863. 97 612355. 20 N 70. 28562093 W 149 .09065815 TJA 9790.63 45. 00 165. 57 8410. 00 8489. 70 3566. 17 -3944. 34 527.97 --- 0.00 5.59 5954786. 81 612376. 28 N 70. 28540927 W 149. 09049686 W-45 Tgt Sag 9917.91 45 .00 165 .57 8500 .00 8579. 70 3650 .99 -4031 .51 550.40 --- 0.00 5.60 5954700. 00 612400. 00 N 70 .28517115 W 149 .09031542 TSAG 9917.93 45. 00 165. 57 8500. 01 8579. 71 3651. 00 -4031. 52 550.40 --- 0.00 5.60 5954699. 99 612400. 00 N 70. 28517112 W 149. 09031540 7" Csg Pt 9918.34 45 165 .57 8500.3 8580 3651 .27 -403 1.8 550.48 --- 0 5.6 5954699. 71 612400. 08 N 70 .28517035 W 149 .09031482 Crv 11/100 9942.91 45 .00 165 .57 8517 .68 8597. 38 3667 .65 -4048 .63 554.81 114.62E 0.00 5.60 5954682. 95 612404. 66 N 70 .28512438 W 149 .09027978 TSHUA 9946.19 44. 85 165. 10 8520. 00 8599. 70 3669. 84 -4050. 87 555.39 114.29E 11.00 5.60 5954680. 72 612405. 28 N 70. 28511826 W 149. 09027504 10000.00 42 .69 157 .14 8558 .88 8638. 58 3705 .70 -4086 .04 567.37 108.53E 11.00 5.64 5954645. 73 612417. 77 N 70 .28502216 W 149 .09017816 TSHUB 10008.30 42. 40 155. 85 8565. 00 8644. 70 3711. 22 -4091. 19 569.61 107.58E 11.00 5.64 5954640. 62 612420. 09 N 70. 28500810 W 149. 09016005 TSHUC 10041.88 41. 41 150. 52 8590. 00 8669. 70 3733. 45 -4111. 19 579,71 103.61E 11.00 5.66 5954620. 76 612430. 48 N 70. 28495344 W 149. 09007833 TSHUD 10068.42 40. 80 146. 18 8610. 00 8689. 70 3750. 88 -4126. 04 588.85 100.34E 11.00 5.68 5954606. 05 612439. 85 N 70. 28491287 W 149. 09000433 TEIL 10081.60 40. 56 143. 99 8620. 00 8699. 70 3759, 47 -4133. 09 593.77 98.68E 11.00 5.69 5954599. 08 612444. 87 N 70. 28489362 W 149. 08996452 10100.00 40 .30 140 .89 8634 .00 8713. 70 3771 .37 -4142 .54 601.04 96.32E 11.00 5.70 5954589. 74 612452. 28 N 70 .28486779 W 149 .08990570 TSAD 10120.94 40. 10 137. 34 8650. 00 8729. 70 3784. 79 -4152. 76 609.88 93.60E 11.00 5.71 5954579. 65 612461. 28 N 70. 28483988 W 149. 08983415 10200.00 40 .34 123 .85 8710 .49 8790. 19 3833 .75 -4185 .80 648.46 83.29E 11.00 5.75 5954547. 19 612500. 34 N 70 .28474961 W 149 .08952199 10206.35 40 .42 122 .78 8715 .33 8795. 03 3837 .54 -4188 .06 651.90 --- 11.00 5.75 5954544. 98 612503 .81 N 70 .28474343 W 149 .089 45P 10212.49 40. 42 122. 78 8720. 00 8799. 70 3841. 20 -4190. 22 655.25 --- 0.00 5.75 5954542. 88 612507. 19 N 70. 28473754 W 149. 08946 8 10240.33 40 .42 122 .78 8741 .19 8820. 89 3857 .79 -4199 .99 670.43 6.14E 0.00 5.75 5954533 .33 612522 .51 N 70 .28471083 W 149 .08934428 44P 10258.75 42. 44 122. 46 8755. 00 8834. 70 3868. 97 -4206. 56 680.69 5.90E 11.00 5.76 5954526. 92 612532. 87 N 70. 28469288 W 149. 08926123 43P 10293.72 46. 27 121. 92 8780. 00 8859. 70 3891. 32 -4219. 58 701.37 5.51 L 11.00 5.78 5954514. 21 612553. 74 N 70. 28465732 W 149. 08909385 10300.00 46 .95 121 .82 8784 .32 8864. 02 3895 .49 -4221 .99 705.25 5.45E 11.00 5.78 5954511. 86 612557. 65 N 70 .28465073 W 149 .08906248 42P 10331.32 50. 38 121. 40 8805. 00 8884. 70 3916. 90 -4234. 31 725.28 5.17E 11.00 5.80 5954499. 83 612577. 86 N 70. 28461705 W 149. 08890041 41 P 10390.36 56. 85 120. 70 8840. 00 8919. 70 3959. 96 -4258. 81 765.99 4.75E 11.00 5.83 5954475. 95 612618. 92 N 70. 28455013 W 149. 08857106 Tgt 1 10399.63 57. 87 120. 60 8845. 00 8924. 70 3967. 01 -4262. 79 772.70 4.70E 11.00 5.83 5954472. 07 612625. 70 N 70. 28453925 W 149. 08851671 10400.00 57 .91 120 .60 8845 .20 8924. 90 3967 .29 -4262 .95 772.97 4.70E 11.00 5.83 5954471. 92 612625 .97 N 70 .28453882 W 149 .08851455 10500.00 68 .88 119 .64 8889 .91 8969. 61 4047 .58 -4307 .71 850.21 4.27E 11.00 5.88 5954428. 31 612703 .85 N 70 .28441650 W 149 .08788959 31P 10500.24 68. 90 119. 64 8890. 00 8969. 70 4047. 78 -4307. 82 850.40 4.27E 11.00 5.88 5954428. 20 612704. 05 N 70. 28441619 W 149. 08788800 WeIlDesign Ver SP 2.1 Bld( doc40x_100) W-Spare\Plan W-45\Plan W-45\W-45 (P6b) Generated 8/27/2007 1:19 PM Page 3 of 4 Comments Measured Inclination Azimuth Sub-Sea TVD ND Vertical NS EW Gravity DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS "IUbUU.UU /y.iSb "I "I 25.25"I 25`J16.253 iSyyb.b3 4133.3y -43b4.b4 y34.13 4.U4L 11.VV b.`JL bJb43i5L.b3 blL/25 Z5.4b IV /U.Lt54Lt525Lb VV l4y.VL5/L IUO/ Tgt 2 / Crv 8/100 10692.51 90.00 118.10 8925.00 9004.70 4214.96 -4398.49 1015.04 3.80E 11.00 5.96 5954340.00 612870.00 N 70.28416845 W 149.08655591 10700.00 90.60 118.06 8924.96 9004.66 4221.58 -4402.01 1021.64 3.80E 8.00 5.96 5954336.57 612876.66 N 70.28415881 W 149.08650244 End Crv 10793.23 98.04 117.56 8917.94 8997.64 4303.44 -4445.36 1103.81 --- 8.00 6.00 5954294.46 612959.46 N 70.28404036 W 149.08583758 Crv 8/100 10948.75 98.04 117.56 8896.19 8975.89 4438.81 -4516.61 1240.33 148.64E 0.00 6.02 5954225.25 613097.00 N 70.28384564 W 149.08473305 11000.00 94.53 115.42 8890.58 8970.28 4483.12 -4539.33 1285.91 148.88E 8.00 6.03 5954203.22 613142.92 N 70.28378357 W 149.08436425 W-45 Tgt 3 TSAD 11007.80 94.00 115.10 8890.00 8969.70 4489.80 -4542.65 1292.95 147.69E 8.00 6.04 5954200.00 613150.00 N 70.28377449 W 149.08430731 End Crv 11051.58 91.04 113.23 8888.08 8967.78 4526.94 -4560.55 1332.85 --- 8.00 6.05 5954182.70 613190.16 N 70.28372557 W 149.08398447 Fault Crossing 11700.00 91.04 113.23 8876.33 8956.03 5071.88 -4816.25 1928.60 --- 0.00 6.13 5953935.91 613789.60 N 70.28302668 W 149.07916437 Crv 8/100 12041.50 91.04 113.23 8870.14 8949.84 5358.88 -4950.91 2242.37 144.93E 0.00 6.16 5953805.94 614105.31 N 70.28265855 W 149.07662591 W-45 Tgt 4 TSAD 12057.35 90.00 112.50 8870.00 8949.70 5372.15 -4957.07 2256.97 144.21 L 8.00 6.17 5953800.00 614120.00 N 70.28264171 W 149.07 12100.00 87.23 110.50 8871.03 8950.73 5407.27 -4972.70 2296.64 144.16E 8.00 6.18 5953784.97 614159.89 6 N 70.28259899 W 149.076 End Crv 12152.60 83.83 108.03 8875.13 8954.83 5449.28 -4990.00 2346.13 --- 8.00 6.20 5953768.41 614209.63 N 70.28255168 W 149.07578646 Fault Crossing 12500.00 83.83 108.03 8912.50 8992.20 5721.43 -5096.88 2674.56 --- 0.00 6.23 5953666.43 614539.58 N 70.28225940 W 149.07312938 Crv 8/100 12710.11 83.83 108.03 8935.10 9014.80 5886.03 -5161.52 2873.20 32.19R 0.00 6.25 5953604.76 614739.15 N 70.28208260 W 149.07152236 12800.00 89.92 111.85 8940.00 9019.70 5958.51 -5192.11 2957.52 31.98R 8.00 6.28 5953575.42 614823.90 N 70.28199893 W 149.07084028 W-45 Tgt 5 TSAD 12801.18 90.00 111.90 8940.00 9019.70 5959.49 -5192.55 2958.61 33.80R 8.00 6.28 5953575.00 614825.00 N 70.28199773 W 149.07083142 12900.00 96.56 116.32 8934.34 9014.04 6043.16 -5232.81 3048.60 34.05R 8.00 6.30 5953536.09 614915.57 N 70.28188766 W 149.07010348 End Crv 12942.69 99.39 118.25 8928.42 9008.12 6080.21 -5252.18 3086.16 --- 8.00 6.32 5953517.28 614953.41 N 70.28183469 W 149.06979962 Crv 8/100 13462.89 99.39 118.25 8843.57 8923.27 6534.31 -5495.14 3538.25 151.46R 0.00 6.37 5953281.09 615409.02 N 70.28117040 W 149.06614279 W-45 Tgt 6 TSAD 13486.89 97.70 119.18 8840.00 8919.70 6555.40 -5506.54 3559.06 151.99R 8.00 6.37 5953270.00 615430.00 N 70.28113922 W 149.06597442 13500.00 96.77 119.68 8838.35 8918.05 6567.03 -5512.94 3570.39 152.05R 8.00 6.38 5953263.78 615441.42 N 70.28112174 W 149.06588279 End Crv 13512.41 95.90 120.14 8836.98 8916.68 6578.10 -5519.08 3581.08 --- 8.00 6.38 5953257.79 615452.20 N 70.28110493 W 149.06579635 TD / 4-1/2" Lnr 13775.02 95.90 120.14 8810.00 8889.70 6813.11 -5650.26 3806.97 --- 0.00 6.40 5953130.00 615680.00 N 70.28074626 W 149.06396926 Leg al Description: Northi ng (Y) [ftUS] Eastin g (X) [ftUS] Surface : 3749 FSL 1455 FEL S21 T11 N R12E UM 5958722.52 611789.75 Kup Tgt : 1578 FSL 1247 FEL S21 T11 N R12E UM 5956555.00 612035.00 Sag Tgt : 4997 FSL 914 FEL S28 T 11N R12E UM 5954700.00 612400.00 TSAD Tgt 1 : 4766 FSL 692 FEL S28 T 11N R12E UM 5954472.00 612626.00 TD / BHL : 3378 FSL 2941 FEL S27 T11 N R12E UM 5953130.00 615680.00 WellOesign Ver SP 2.1 Bld( doc40x_100) W-Spare\Plan W-45\Plan W-45\W-45 (P6b) Generated 8/27/2007 1:19 PM Page 4 of 4 • d a ~: WELL W_45 (P6b) FIE`p Prudhoe Bay Unit - WOA 9TRU~rDRE W-PAD Magnetic Parameters SuRace Locallon NAD2] Alaska Slete Planes, Zore Oa, US Feef cellaneous Motlef. BGGM 200] pecember 05, 200] Lat: N)01]J6.266 NonXi,g. 5958]22 IIUS Grid DOr1V: *0862235)2' Sbl: W-SOare TVD Ref'. Rotary Table l)9.]O ttabwe MSL) Mag pec. 823263' FS'a 5)644.) nT Lon: W1e95611]0 EasYing: 611)89 ]S XUS Scale Facf 099991x1963 W-a51P66) Srry pate: Augus12I, 200] 0 1200 2400 0 ~ ~r~~ . ....................... .................~..... 1200 2400 3600 0 0 c n 4800 m U F- 6000 7200 8400 9600 3600 4800 6000 7200 I MLV / LI;U End Crv .._. ....... . .......... . .. _..~. ~ Fault Crossing .~. .~.._.,_.. „..,»,.:»,.»...... _..,...».,_ ~...,..... _..».. _..»..,. ,.. W-45 Tgt Sag ! ._. .~. .... .. y.. _....,,.»,.».. ~.. 7 Csg Pt W=45 Tgt4TSAD ,......... W-}5 Tgt6 ._.._ ._.,........ _..» ~. _.. 8/10 Crv- Crv8/1t Crv 111100 C End ~ F~uli Cross :1$.s>* X:1,KK~•.;•-•t: `~.~,~ tee: ; xx Y538 .4' .t „REF 83 Er RRdi IL ^i ^ i. ~~~ - t N ,..... . ~ ~ €~~. ._ . t .. ~~T i Tgt ~ End Crv W-45 T§t 3 TSk@ult Crossng ~ Tgt7 /Crv 8/100 c Crv B/100 End End Crv Crv 81100 _..., ...__.. .... ... ........... . 5 7gt 5 TSAD 0 1200 2400 3600 4800 6000 Vertical Section (ft) Azim = 146.03°, Scale = 1(in):1200(ft) Origin = 0 N/-S, 0 E/-V 0 1200 2400 3600 4800 6000 7200 8400 :.a 9600 7200 • . -~ „ , . ~~® WELL FIELD STRUCTURE W-45 (P6b) Prudhoe Bay Unit - WOA W-PAD Magnetic Parameters Surlaca LPCaUOn 02J Alaska State Planes, Zane 04, US Feel a an= MoCel. BGGM 200] Dip: efi8' December 05, 200] Lat. N]O 1J 4fi.266 Nwtllirg: 5959]2252 kUS GrN COf1V: M852235]2' S1bT. I VD ReI: Rotary Tabk (]9]Ofl above MSL) Mag Dec. 3283' fS1e 5]644.3 nT Lon. t1I0 Easting'. 611]89.]5 flUS Scale Fact: 0.9999141963 Plan JS (P6b) Srvy Dale: August 27, 200] 0 800 1600 2400 3200 4000 0 -800 -1600 n n -2400 Z 0 0 ~ -3200 m U V V V -4000 -4800 -5600 0 800 1600 2400 3200 400( «< W Scale = 1(in):800(ft) E »> 0 -800 -1600 -2400 -3200 -4000 -4800 -5600 BP Alaska Anticollision Report Company: BP Amoco Date: 8/27/2007 Tintc: 13:32:11 Pa;;e: I Field: Prudhoe Bay ReferenceSite: PB W Pad Co-ordinate(NE) Reference: - Well: Plan W-45, True North RefereneeWell: Plan W-45 Vertical (TVD)Refere nceE W-45 Plan 79.7 Reference Wetlpath:, Plan W-45 Ub: Oraele GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are HiEQIisTiaeel-s in thisF~teld'Jpal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Model: ISCW SA Ellipse Depth Range: 28.50 to 13 775.02 ft Scan Method: Trav Cylinder North ', Maximum Radius: 1574.65 ft Error Surface: Ellipse + Casing -- Survey Program for Deftnitive Wellpath - - _ - Date: 11/20/2006 Validated: No Version: 5 Planned Fr om To Survev Toolcode Tool Name ft ft -- 28.50 1400.00 Planned: P lan #6 V1 GYD-GC-SS _-- - Gyrodata gyro single shots 1400.00 2800.00 Planned: Plan #6 V1 MWD MWD -Standard 1400.00 3360.00 Planned: Plan #6 V1 MWD+IFR +MS MWD +IFR + Mu lti Station 3360.00 9870.00 Planned: Plan #6 V1 MWD+IFR +MS MWD +IFR + Mu lti Station 9870.00 13775.02 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Mu lti Station Casing Poi nts - -- MD T~'U l)iametcr Ho}eSize Name. - ft' _ft in ih, -- - - 3412.63 3309.70 9.625 12.250 9 5/8" - - - 9917.91 8579.70 7.000 8.750 7" 13775.02 8889.70 4.500 6.125 4-1/2" Summary <- ----------------_-OFfsel Wellpattt -----------------=> Reference Offset Ctr-Clr 1Vo-Go >~Ik»vablc Site Nell Wellpath MD MD Dislauce -~rca Dcviatiuu Warning ft ft ft ft ft PB WPad W-02 W-02 V4 2188.13 2295.00 229.36 39.00 190.35 Pass Major Risk ', PB W Pad W-02 W-02A V20 2189.31 2295.00 229.39 39.06 190.33 Pass: Major Risk ', PB W Pad W-05 W-05 V4 1357.32 1345.00 350.89 29.88 321.01 Pass: Major Risk PB W Pad W-05 W-05A V3 1357.32 1345.00 350.89 29.88 321.01 Pass: Major Risk PB W Pad W-06 W-06 V5 1460.94 1450.00 287.00 29.38 257.62 Pass: Major Risk PB W Pad W-06 W-06A V2 1460.02 1450.00 286.98 29.36 257.62 Pass: Major Risk PB W Pad W-07 W-07 V1 1341.94 1325.00 333.15 34.16 298.99 Pass: Major Risk ', PB W Pad W-07 W-07A V7 1341.08 1315.00 333.12 34.13 298.99 Pass: Major Risk PB W Pad W-08 W-08 V3 1417.59 1410.00 267.12 27.86 239.26 Pass: Major Risk PB W Pad W-08 W-O8A V12 1418.42 1405.00 267.14 27.88 239.26 Pass: Major Risk PB W Pad W-09 Plan W-096 V1 Plan: PI 1501.90 1510.00 136.43 36.87 99.55 Pass: Major Risk PB W Pad W-09 W-09 V2 1502.55 1520.00 136.44 36.39 100.05 Pass: Major Risk PB W Pad W-09 W-09A V4 1504.42 1510.00 136.49 36.76 99.72 Pass: Major Risk PB W Pad W-09 W-09APB1 V9 1504.42 1510.00 136.49 36.76 99.72 Pass: Major Risk ', PB W Pad W-10 W-10 V4 1789.37 1780.00 178.25 43.76 134.49 Pass: Major Risk PB W Pad W-10 W-10A V5 1789.37 1780.00 178.25 43.76 134.49 Pass: Major Risk ~ PB W Pad W-11 W-11 V2 1568.17 1580.00 127.29 35.20 92.09 Pass: Major Risk ~I PB W Pad W-12 W-12 V5 1480.16 1460.00 278.87 33.91 244.97 Pass: Major Risk i PB W Pad W-12 W-12A V1 1477.51 1450.00 278.81 33.84 244.97 Pass: Major Risk PB W Pad W-203 W-203 V10 507.55 515.00 269.42 7.91 261.51 Pass: Major Risk PB W Pad W-203 W-203L1 V8 507.55 515.00 269.42 7.91 261.51 Pass: Major Risk PB W Pad W-203 W-203L2 V5 507.55 515.00 269.42 7.91 261.51 Pass: Major Risk PB W Pad W-34 W-34 V2 998.76 1015.00 316.80 17.61 299.19 Pass: Major Risk l PB W Pad W-34 W-34A V2 998.76 1015.00 316.80 17.61 299.19 Pass: Major Risk ~i PB W Pad W-34 W-34APB1 V3 998.76 1015.00 316.80 17.61 299.19 Pass: Major Risk j PB W Pad W-35 W-35 V2 955.47 970.00 282.70 18.38 264.32 Pass: Major Risk PB W Pad W-36 W-36 V3 984.98 1000.00 243.22 17.15 226.07 Pass: Major Risk PB W Pad W-37 W-37 V4 1024.71 1040.00 209.64 19.46 190.17 Pass: Major Risk PB W Pad W-37 W-37A V4 1024.71 1040.00 209.64 19.46 190.17 Pass: Major Risk PB W Pad W-38 W-38 V2 1178.88 1210.00 116.43 27.81 88.62 Pass: Major Risk ', PB W Pad W-38 W-38A V10 1176.74 1205.00 116.37 27.75 88.62 Pass: Major Risk PB W Pad W-39 W-39 V2 1138.62 1155.00 140.42 24.49 115.93 Pass: Major Risk I PB W Pad W-39 W-39A V3 1138.62 1155.00 140.42 24.49 115.93 Pass: Major Risk PB W Pad W-400 W-400 V5 1575.81 1590.00 58.63 26.39 32.24 Pass: Major Risk PB W Pad W-40 W-40 V2 1104.01 1120.00 107.27 21.41 85.87 Pass: Major Risk PB W Pad W-42 W-42 V4 1022.76 1035.00 34.77 17.96 16.82 Pass: Major Risk PB W Pad W-44 W-44 V2 1143.94 1155.00 32.11 18.77 13.34 Pass: Major Risk - - - - - --- - - _- __ FieldPrudhoe Bay SitePB W Pad Well :Plan W-45 WellpathElan W-45 ~ ~~ i 7 Y 1 ,i ~. . ~ n3 ~ ~ 8 1 4 ~ 2 z ~ ~ 6'~- l ~_{' 1 6 1& / ~ ~' ~} 1~ ~ 3 ~ ~. [~l 1~~8~ ~ ~1 9 ~ 2 0 Q ,~ ~ 1 - 0 D 1~7 \ ~ ~. 3 0 1 711 ~ 1 ~}~0 ~ 1 ~ 1 6 ~ ~~~ ~ 1 ~ s, ~ ~ { ~ ~ `~ 2 0 1 5 % ~ , 0 ± ,~ ~ ,. tb i x~ l \ -100 _ ~ ~ V l 3/ ~ ~ t 00 ~ -_ ~ iir l 6 9~ ~ I., ,b18~~ 9 ~ ~ ~ ~ ~~ ~, ~~t~ 1 ~ t 3 it ~ ~ 1 ~ ~ 1 ( 1 6 4 ~ 1 6 ' ~ (~' ~ 1 7 ~ ~ 1 ~ ~ i5 1 { 1 Z3 li 1 Ei 7 y ~ ~ ° 2 -1-,~ s o z o ~-i~~ ti- ~ 1 .1 1~ ~ ~ ~ ; 2 T I ~ B ~ ' ~fl 1~ 3'' 'T-:3 T ' 17 ~ 13 I 6 a ~ ~~ ~ ~~8. ~D ~ ~ 1 ~ 1 /1' f 'F5 706 ~{id -1 0 0 1 0 0 1 6 ~ I 1 ~1~ ~ ~~ ~ ~ 1 ~ ~ ~ <t 17 ~ 1d 107 I '11~' 1 9 1 3 ~ 20 8 , ~ 2 0 c ~ Z 5 ~ 1 9 ~ ~11 ~ 2 1 i5 j 200 0 ~ 2~1~ 22 1 Q8 1 ~ ~ i 1 / ~ 1 7 ~, 2 1 + ` ~ ~ [ 3 ~~ 1 ( / j nn j/L O ry t G ! 2 0 ;~~ i ~l ! 4 1 iJ ~ y ~(J0 j ~ ~~ 304 -3 1 3 '~°~"'--_. , 3 0~ ~.------'`yam Travelling Cylinder Azimuth (TFO+AZI} [deg] vs Centre i ~ Target: W-45 Poly - - Site: PB W Pad Vhl: Plan W-45 Drilling Target Conf.: 95% Based on: Planned Program Description: Vertical Depth: 8845.00 ft below Mean Sea Level MaplVoi=Tiing:3~5~4$£~~~~ - __ __ Local +NTS: =446_£3$ ~'t Map Easting : 612628.00 ft Local +E/-W: 775.24 ft Latitude: 70° 1 T04.498N Longitude: 149°OS' 18.586W Polygon X ft Y ft Map E ft Map N ft 1 -230.79 -184.60 612400.00 5954300.00 2 2055.47 -113 8.79 6 7 4700.00 5953380.00 3 3048.30 -1633.66 615700.00 5952900.00 4 3202.76 -1335.90 615850.00 5953200.00 5 2240.97 -771.48 614880.00 5953750.00 6 24.86 191.67 6 ] 2650.00 5954680.00 0 ~ ~ ~ 0 ~ 0 ~ ~ 0 ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ (~ ~ ~ ~ 0 ~ ~ i 6050000 6000000 5950000 5900000 5850000 EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 400000 500000 600000 700000 800000 Page 1 of 2 • • Maunder, Thomas E (DOA) From: Staudinger, Mark [Mark.Staudinger@bp.com] Sent: Thursday, October 11, 2007 4:55 PM To: Maunder, Thomas E (DOA) Cc: Tirpack, Robert B Subject:. RE: W-42 Tom- Sorry to get back to you so late, but I've been swamped with catching up since getting back from vacation. I'm assuming you are referring to the Permit to Drill for W-45, not W-42. I have answered your questions below. I also wanted to let you know that we have modified the directional profile since I sent in the permit. Our latest plan has changed through the intermediate section with less directional difficulty and tortuousity. All of our targets in the production section are essentially unchanged. Please let me know if you have any other questions. Thanks, Mark Staudenger BP Exploration Alaska GPB Rotary Drilling (907) 564-4337 (907) 440-7403 cell From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Wednesday, October 03, 2007 2:09 PM To: Staudinger, Mark Cc: Hobbs, Greg S (ANC) Subject: W-42 Mark, 1 am reviewing the permit and have some questions ... 1. I need some clarification on the cement calculations and yields. --is your surface lead deepcrete or litecrete? Deepcrete --using the 1.16 yield for surtace tail and 85 bbls volume, I calculate 411 sx. That is correct. I missed that in the original permit. --the intermediate lead yield is given as 1.53, but that seems low for 12.5 ppg . Slb provided me with the incorrect yield. It will actually be a yield of 2.24 cuft/sk, which will actually yield 436 sks for the 174 bbl job. -the liner cement weight is given as 15.8, but the yield is 1.53 which seems low. Again, the yield for the liner job should be 1.17 cuft/sk. This will yield a job quantity of 444 sks for the 92.6 bbl job. 2. Although Kuparuk is not expected at this location, what is the MASP for the intermediate hole if it is encountered? MABHP = 3466 psi in Kup (based on 9.8 ppg @ 6800' TVD) 10!12/2007 Page 1 of 1 • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, October 03, 2007 2:09 PM To: Mark Staudinger Cc: 'Hobbs, Greg S (ANC)' Subject: W-42 Mark, 1 am reviewing the permit and have some questions ... 1. I need some clarification on the cement calculations and yields. --is your surface lead deepcrete or litecrete? --using the 1.16 yield for surface tail and 85 bbls volume, f calculate 411 sx. -the intermediate lead yield is given as 1.53, but that seems low for 12.5 ppg -the liner cement weight is given as 15.8, but the yield is 1.53 which seems low. 2. Although Kuparuk is not expected at this location, what is the MASP for the intermediate hole if it is encountered? What is "no Kuparuk" based on? Look forward to your reply. Call or message with any questions. Tom Maunder, PE AOGCC 10/3/2007 Alaska Department of Natural Resources Land Administration System Page 1 of 3 • ~ ~ ° ..~-apt ~ ._art~ t~: ~-r -t ~`~~~= Plats Re~-;~~~le€`s Sea~~ch State Cabins b1~'ttl~~ 1S+D411'~5 Alaska DNR Case Summary File Type. ADL File Number: 47452 ~- printable Case File. Summary. See Township, Range, Section and Acreage? ~` Yes C' No New Search l_AS Men~~ I Case Abstract I Case Detail I Land Abstract _ .~ 1'[le: aDL X74.52 '~`_!' Search for Status Piat Updates ,~~ cat Uy`1 ;2007 Customer: 000107377 BP EXPLORATION (ALASI~~~.)1NC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 7& OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location; DOG DIV OIL AND GAS Case Status: 35 ISS/APPRV/ACTV/ AUTH Status Date: 09/30/1969 Total Acres: 2560.000 Datelnitiated:08/11/1969 Office of Prin~iary Responsibility: DOG DN OIL AND GAS Last Transaction Date: ].2/04/2006 Case Subtype: 1W~ NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED ~1lerii~icrrt: (1 7rnrns{tij~: O11N Ritn~r: 012E ,Section: 2? S'c~clion:Icres: 6=10 Search Plats ;llerrirlian.~ ~ ~ 7rni ~aslri/~: O 1 1 N Raft<<rt~: 012E S'ecti~,~t: 28 ;IIL'1'tilt(lYl.' ~_~ 7UlC/1.5~11~): O ~ ~ ~ Kan,~rc: O~ ~ L .~'e'C/lUll: 1k>ridiurt: U Tolrrts{t1~~: OIIN R~ln~,,re-: 0120. Section: 3~l Legal llescription 08-I1-1969 * * *SALE NOTICE LEGAL DESCRIPTION* * ~` C23-037 TI1N-R12E-UM GENERAL 27 640.ODALL 28 640.00 ALL 33 6;10.00 ALL 3~ 6.0.00 ALL TOTAL ACRES - 2560.00 Section :~l cre.~~: 6~0 1'ectiun Acres: 6~0 Section .1crc>s: 610 http://www. dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=47452&... 9/ 13/2007 Alaska Department of Natural Resources Land Administration System Page 2 of 3 • 04-01-1977 * * * * UNITIZED AND LEASE LEGAL DESCRIPTION * * * * * * * LEASE COMMITTED IN ENTIRETY TO THE PRUDHOE BAY UNIT PRUDHOE BAY UNIT TRACT 80 T. 11 N, R. 12 E., UMIAT MERIDIAN, ALASKA SECTION 27: ALL, 640 ACRES; SECTION 28: ALL, 640 ACRES; SECTION 33: ALL, 640 ACRES; SECTION 34: ALL, 640 ACRES. CONTAINING 2, 560.00 ACRES, MORE OR LESS. 04-01-197? **** PARTICIPATINGAREA LEGAL DESCRIPTION ***************** LEASE COMMITTED IN ENTIRETY TO OIL RIMAND GAS C 4P PARTICIPATING AREAS PRUDHOE BAY UNIT OIL RIMAND GAS CAP PARTICIPATING AREAS TRACT 80 T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA SECTION 27: ALI,, 640 ACRES; SECTION 28: ALL, 640 ACRES; SECTION 33: ALL, 640 ACRES; SECTION 34: ALL, 640 ACRES. CONTAINING 2, 560. DO ACRES, MORE OR LESS. 11-01-1999 **** PARTICIPATING AREA LEGAL DESCRIPTION ***************** LEASE COMMITTED IN PART TO THE POLARIS PARTICIPATLNG AREA PR UDHOE BA Y UNIT http://www. dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=47452&... 9/13/2007 Alaska Department of Natural Resources Land Administration System Page 3 of 3 POLARIS PARTICIPATING AREA TRACT 80 T. 11 N, R. 12 E., UMIAT MERIDIAN, ALASKA SECTION 27: NE/4NE/4, 40.00 ACREN CONTAINING 40.00 ACRES, MORE OR LESS. ~*x~*****************~***~**********~***~~~M~*~~*~***~********~******* 02-01-200;1 * * *LEASE COMMITTED IN PART TO ORIDN PARTICIPATING AREA LEGAL DESCRIPTION PRUDHOE BAY UNIT TRACT 80 (PARTIAL) ORION PA T. 11 N, R. 12 E., U.M. SECTION 28: W2, W2E2, 480.00 ACRES; CONTAL'VING APPROXIMATELY480.OORCRES, MORE OR LESS ~'nd of Case Summary Last updated on 09/13/2007. Not sure who to contact? Have a question about DNR? Visit the Public In~c~ratcsn Center. Report technical problems with this page to the ebaster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all C®Cl_K~~ must be accepted. State of Alaska Na#urai_Resources LAS Home Copyright Privacy System Staius http://www. dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=47452&... 9/ 13/2007 ~ ~ TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ yY' ~~ PTD# o~~/o?~D / Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -`) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception... assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit; Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. SCompan„„y Name) must contact the Commission to obtain advance approval of such water well testing ro am. Rev: 7/13/2007 ,,~, • • ~~ , m o- ~ N p ! ~! ~ a N' 4 0 r 3. ~ ~ o O I (4 ~ N N ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ II ~ fl. C~ C ~ ~ N. cn a N ~ w . , ` c n , urn ri, o~ o ° °n Q. °, ~ ~, r a. °~ ° ° ~ , ~ , t ~ c. ~ ~ a ' ' o w w ~i ~ ~' ~ ai. O a. ' Z p i ~ m. o ~, `, ~ N, o o, m. o. I-. v i ~ . 1 W i O .Q o, o •4 ~ ~ ~ W d m~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ Q ~ ~ L~ '3. ~ g ~ y, ~ ~~ ~~ ~ • r II ~ ~ ~ ~ ~~ f6 N ~ ~ ~ ~ ~ ~ ~~ i'k, N, a >f N. ~ N ~ N ~ Z N~ N E N p• N Q ~ N. U a ~ > m C7 m, ~ a x ~ o I > , m p c i6 'X, •~ Q a ~ a i p ~ N Q, Z N~ N, } N, N~ N~ N, N, N } } }~ tn, N, } N~ N. N, N } }' N. N~ N N }' ~ ~ N~ N ~ N~ N N N ~ ~ Q, Q, Q O Z Z Z~ Z~ N, N, N~ ~ Q N O ` ' ' N~ N, N, N; N~ N, N, Q, N ~ N~ tA~ N N N~ N~ N~ N, N N N~ N~ N, N Q, ~ O, Q, Q, Q ' N~ N d , } } }; } , } } Z Z } } ~- Z } , }; }; ~- }; }; } }; Z Z Z Z Z ~ x (J W, C O' N. , O. o 7. ]^,I • ~~ ~ ~ ~ ~ ~ ~ ~ ~ • O ~ N C u> ~ ~' o. ~' U 3 , O, m, `~' N ° ~' ' O ~ ~ Z` , ~ ~ ~~ ~ ~: N, N, Q 'c~ o, ; N N ~ rn ~ `c~' ~ ~ o ~ ~~ ~ ~ ~~ ~ ~ ~, ~ ~ ~ a ~ ~ i a ~ ~ ~ ~ ~ ~ n ~ ~ ~ c. ~ , ~ 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ fl. ~ a o Q y a? o. c ~ ~ ~, aai, ~ m. ~ ~ ~ ~ N. ~ ~ ~ C• ~~ .N C, a. O f N O. 7, °~ ~ ~ O, i/a ~ (6 C ~ ?, ~ N• N ~,. ~ ~ ~ pp 3, •C~ ~ ~ ~ O. • ~ 3 p. a ~ M. ~ ~, U. N. ,N. fl: ~~ O, _ • ~ py ~ ~~ ~ ~, j a, N. N. Q V ~ ~ ~ C. N, 7• ~ ~ ~~ f6' ~' x L-' Q ~' N ~ p, -~°' ~~ d ~ ~ ~~ ~, ~: ._ ~ O M~ a. ~ O• I ~ ~~ N• N ~~ LL1 ? ~ ~ ~ -~~ 0, ~ .O~ ~ 0, ~~ p .d ~~ . 4 ~ ~~ O. C N• CC6 ~ p. O, ~ ~ ~ ~ ~~ L ~ C~ C• ~~ C. ~, ~ . . O ~ ~ ~ E, E, - a, ` C, C E r _ , ~~ ° M ( O C N ~, ~~ n C ° ~ °~ w~ ~~ . ~~ N. +~-~ pl Q. N L , a O C o p ~ 0 , 0 - o ° o a . ~ ` ~~ 3 0 of ° U r- 'Q m a ~ ~ a~ c o ~ d o n •3 • o m N N ~ ~~ ' •T ~ a ~ ~ ~ c. a, c, ° ~ o y o o Q. ~ o. c. a? = , a . o, m. _, °~ •m . Q. m m y T > o. ~, ~, a~ o. Y ° N ~ m ~ ~ E' a m a ~' o' o' °~ c' ~' N °r Z' o' ~' °' 3' ~'' °' ~' =' ~' 3' 3 ~ ' a Q i ~ ~~ m, °~ ~~ c, a, ~ , ~ m, °, o, o, n t, ~ t~ ~ .o a , m. ~ ~ ~ a, E. `°~ v. a~ ~~ ~, .S ~ ~~ c, ~,~ ~ o. N , ~ %~ M. ° •-~ a~~ w. t ~ rn o ar ~, o~ a a 3 o, , 0 ~~ ~ 0. >r ~~ , o ~ E w o ' z O ° ~ o ° ~~ c. •~ `a ~?~ `a > o ~ .~ ~ 3~ 3 , a i a~, .. ~ ' ` c -a N ~ ; 3 ~ ~ a ° ; o v' N ° ° o N ~ m °: N o, m ' ° a ° y ~ U ~ _ o C'L a . N ~ , ~ , O U a N a. N o o ~, O o o o , Y N o O; a E~ N E~ c L O a. N a~: 0 . .. ~ $ Q . N t' 4 ~ O, a Q. Q. ~ ~~ N , . N ` O` ~ N 7 N Q ~ . C V ~~, U ~, 0- ~~ ~ ~ . - . a O~ N ~ ~~ ' ' 'O (6' ' ` ~' 01 O' C~ Q _ (n' ~3, N~ :O~ ~ 7' O, O~ ~~ N~ ~ 0: o (6, (6 O, O, O N 3 `C ~~ N t /_1 ~ t A ~ f0 ~ r N; ~ i m °- (6 (6 N ~ f0 p ~, p~ N . O a N ' ~ ~ t~ p~ O. a O J .~.., ~ .~~ 11 fl. N. ~ C, ~, ~ . . •`: ~ U 6 N~ C ~~ ~; N = Q 0 L ; ~ O 0~ U U, ~~ T '• N• iL a N' ~~ -~ a~ a~ a~ u ~ U m C• ~, Q~ Q, _ a. L_, N• ~ ° ~ y~ '~~ N, N. a a >, ° .~ N ~, t, 3, ~ -° N, ~~ o N ° , ~ V~ ° m Q, ~~ t6, C, c ~~ X ~ m ~, ° ~, ~, ~? m m 3 ; m , -o a> ~ o s, ` ` c, ~ c, ~ ~ E u 3' ° a~' m - o m ~ m' m' c~' °' aj - -' ~ ~ a ~' °' o, , = c ~ I c m a~ N , o m ° ~u c w ~ ~ c . . , ° v °, a o, . v o ~ ~, ~ o' o' ~' °, ~ . °~ y v vi o, o. c, ~, ~ ~, o; o; - a ~ in ~ -`o. m, ~~ w •e, rn ~ a ~~ vi. , o •c , 3. ar ~~ ~~ ~ ~ . a. ~ l~ d J m E' ; ° ~ -, _, _ ~, •~ a , ~ ~ a -~ 3, °~ ~ ~ ~ ~ ~ '~ ~ ~ ° '~ ' ~ ''~ ~ v E a. ° ~' ~ ~ ai -~_ Y a' ~ ~ ,c o' °' ' ' °' ' , ~', a ~, a~ a a ' ' , a~ ' a~ m °' - ~~ o ' ' ' o ' ~ °, ~' ~' ' ' ~' ' m ' a i a a i, ~ a, ~ ~ = ' a tL, o O' O s, ' ' o' °: ai ' ' ' a : o' ; m. i i ~ c. U' m p ~.O ~ c p ~; ~ , ~ ~ - O O a o U z ~ , Q; a U ~ U U U U ¢; _ Q, o m m U ~ , ~ ~ d n m W d _ ° ~-- N M V ~ CO f~ W O O r r ~ N ~ M ~ V ~ CO 1~ ~ ~ ~ ~ i W ~ O O ~ N N N N M N ~ N ~ (O N N f~ W N N ~ m 0 N M M N M V M M M to M M M ~ 00 M M O M ~~ U U ~ i n - -- ~ C C C ~ O ~ 0 ~ y O V C O Q • ~ r ~ ~ ~ ~~ ~ r ~ N `~ W O ~ w ~ C •` [) J N N = aoi ~ aT ("~ J L J ~ a ~ ~ a ~ I ~ p, cn U .. ~ a~ d a Q W a ~~ 'I ~ aQ .