Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout207-138 • STATE OF ALASKA •
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other. 0
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 207-138
3. Address: P.O.Box 196612 Anchorage, Development 21 Exploratory 0
AK 99519-6612 Stratigraphic 0 Service 0 6. API Number. 50-029-20726-02-00
7. Property Designation(Lease Number): ADL 0028306 8. Well Name and Number. PBU 15-04B
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
RECEIVED E C E I V E D
Total Depth: measured 12865 feet Plugs measured 12704 fee
true vertical 8881 feet Junk measured feet AUG 3 1 .2017
Effective Depth: measured 11030 feet Packer measured See Attachment feet
true vertical 8895 feet Packer true vertical See Attachment feet AOG
CC
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 81 20"91.5#H-40 31-111 31-111 1490 470
Surface 2621 13-3/8"72#L-80 29-2650 29-2650 4930 2670
Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: See Attachment feet
sciTrue vertical depth: See Attachment feet c
1��iE) NOV I) 2 2017
Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 249 21356 0 1100 423
Subsequent to operation: Shut-In 1000 0
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations ® Exploratory ❑ Development m Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas ❑ WDSPL 0
Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Authorized Name: Odom,Kristine Contact Name: Odom,Kristine
Authorized Title: DS 06&13 PE Contact Email: Kristine.Odomibp.com
Authorized Signature: Date: 6/30hr7 Contact Phone: (907)564-5365
Form 10-404 Revised 04/2017 V71- 10/..,---
:.1 //L de(07.1 7 R B D M S v- SO — 5 2017
Submit Original Only
• •
RECEIVED
AUG 312017
AOGCC
Alaska Oil and Gas Conservation Commission
333 West Seventh Avenue
Anchorage, AK 99501-3572
RE: BP Exploration (Alaska), Inc.
Report of Sundry Well Operations Summary
August 30, 2017
To Whom it May Concern:
Attached please find the Report of Sundry Well Operations for Adding Perforations for
Well 15-04B, PTD # 207-138.
Sincerely,
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Attachment: Form 10-404
BP Exploration (Alaska) , Inc.
P.O. Box 196612 Anchorage,AK 99519-6612
• •
Packers and SSV's Attachment
PBU 15-04B
SW Name Type MD TVD Depscription
15-04B PACKER 2449.59 2449.48 7" BAKER SBP PACKER
15-04B TBG PACKER 9002.4 7858.95 4-1/2" Baker S-3 Hydro Set Packer
15-04B TBG PACKER 9099 7931.59 3-1/2" Baker FB-1 Packer
•
d
a.O000O090OOMM
0
- N d 0 0 0 0
O r r
V
• OOOOO 000000
3 v OM) OHO N N , co� CO-
m v co co I• co co co O O
O OO 0 .— M M NO
O .— O 1- OO O OO N- N 0
W 0M000 V ,tMOO
NN. CON- COCOCO N- CO
> i i l l l l l i l i i
I-
CO Q) tC) CO N CO
CO N. c— Tr O I� CO I's V—
C) N N LON M M O N M OO)
03O
- COMMON—
N c000 00 OO
✓ p
COW MNN2N000NM0
M
• W
0. 0 0 O O Oo OD O
0 . co
'N N V N M N
Q) CO a0 N - N W CV
V N " ou = N ZNI FNM '
.M
4
c o CO O 1� O 00
co N OO �O CO C') O O M O
W W
Q Q
Oc W
W•N UU W
ca cc re
Z Z Zuou_ ccrecere
Z W W W W W W m m m
O D -tF- ZZZZDDD
U coZZJJJJH- I— I—
i •
H
CO N 0 ti 0) CO CO Cl) O) O) 0 CO 0 N- CO N r-
L O O N CO Cr) CO c- CO N CO OO •- CO vt
CN M0 aM CO a0 O O 0m N to 0
N O Cr) (NI co O) O) 0 0 0 0 0 0 0 0 0
G CO CO
0 CO a) 003 CO
OO CO CO CO CO 00 00 U) a)) CCOO CO
I-
a.
O
I— tO O) to CO Cr) 00 N N 0) CO N O) 0 V N-
t N N CO ` a) CO A- Cl) CO 00 C) N r- to CO
N (1) Cl) N O 0) O0) O O O O O 0)) O oi O O 0
0 O) a) a) 0) 0 00 co 0) a) a) 0) 0) co co 0) O) >
0 00 CO a)) 0 0 CO 03 a) a) CO 00 CO CO 0 0 0 0
2
cc w a
w
0 o z
F- a W
m 5 5 U Y O 0
t N vt N A-- O O O O O O O O O O O O N - J 00W
a CO 0) 'd' LO N co co co tO v '- to V' CO to O) J J J Q Q U) W Q'
m ' d LO •CO r- N Vt CO N- CO A- N CO (0 Q Q Q w a a _Z
a 0 0 0 0 N N N N U 0 U J W w 0 -t L7
J J
= g
00C-) Luaq .W Z p Z
La w W a
2220 W CO a) v) ai
CO gitt
.1-1PO
< 1.0 °
Z O N _O O) 0 0 0 0 0 0 0 0 0 O_ O O
O = d �l CD � toCOOA-- ACA1A-- NMtMnC�O � � NCO
• co0 0 0 O 0 N N N
co n`
lY (n J = 1 O a d
2 2 2 O m cn cn cn cn
d
a
V
O
° aaLL. aaaaaCCCCCCrcCeXCL
to a a a a. a a a awwwwwwww
a < < < < < < Q ¢ aaaaaaaa
O
t
d
a 0
w
-J
D W
`� � � � � �0N- N- 0000000CO CO Op CO CO CO CO 0 a 7 Q
C N N N O O O O O O O O O O O O W LL Ll
N N N N N N N N N N N N Z a d < W W
M N N N N O O) O) CO CO CO CO CO CO CO CO CO O a C7 L7 U W W ct
0 i tiLLI
i r� comcflCo m o °g °-g _i -i a a w w
Q Q CO CO t� ti cn cn a cc
m
E
z m m m m m m m m m m m m m m m m
stvvvgct 'Tr vvv •ct- v
3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u. a co o t L N ceI t
tci to to to to to to to to to to to in to co to m a a 0_ 0 --I a a w a
Q a m m u_ co cn a re
• • •
in °' c v LLI
o " Jorn (U
C = s U o = o
0 = 0 ,- o
o Q_e- (Li) 0 w
13 U o 0 -0 U CO Q.. 0 a)
a)
N � � cv Cin OO � 2 a
a) .c co •
ca ' '_ o U) U
U N = U -§- 't NQ4* 0 U 0L o0d d L
c U -0 cc U0 0
(0
E 47:5 C I-
0 s- = d' �' N 0 0 (p U
c' F- U O E N .0 O c (t)O
fn 00 a) 0 0 U) U (Er w 2
L
O cc)O N O_0 O E us p03
U O r
N- ' 0) 7 O +-' ° p = C .
• �`.( N 0 3 H ++ N (0 N O
V Y _ -C O r_.' C
0 3 (O w Q a� a c
(/)
N 0 • O m O 10 CL 0
C U 3 T= 't 0)0_ IC p M �'
O U ° ° � °' J - 030 = .co E
�, � Q- O E
m Q ce Tca � � oo � � o E 0
d2 C� '' = cCo 0c° 0 v- L = a
Q g 0)'t .- a E ai a) cn >.
Ca co I-
= 300- E 0- N N � I` w=2 N- 0
(� - = 'F- ' Cl.) 0) 0) m • 0 `
Q O C C o Y N (U 't - O) O N 3
dQ� C N = O _N 0 N Nom .1= a) Co N - N L
r d d Q)N N- a) O a) N �Np N Y
O E . O 7 rX
"' O (n OJ OCOO N ° -- Q c _c
Ca Q � Q . � � � c 't E � ' Fe a3 5 't 3 4-0 3
O a E Loco) 0 a, .L
0 0 . _0 0 (p (nI- j= Ea .. 3 3 c c •c oa �-
d N a .: N = � = 0 = O � C � O N 0 +p.' e—. -a �
re a0e6 c a0 E -§ w- E en " Q (° c4t � � � o cQa =
_� V m N U U 0 ° 3 O "O N o U *k (O C (p cn M ° U (n O
• . >,N- * ;� gw = L C U :i C O_ 0 (MJZ (� V - =
C CI - 0Ycc * o " OE Nw = * L Lb O tV 1-" w * CZa * a) a)
5co.-.(76 a) ` V +-' L C -0 cc j !- O C N Q 7 j - O M *0 a) O
CU
C
bib E0 baip -aDovi ooai 't0 0c2) wo0aieo ' Q. Jc
`0 0 _ -(7;5 .n E U
> 0 > m rn ° C O > = Q-O > (h a) N
00 , , 0 a) o C N 0) j , C N C c) c‘s , 1 a N U 0 Y
_ _ a)
k0 = o �* O aN a0i c a° = *k0 ° - m ° .. 'En: * 0 3o o � o
Ho - V I- 00 . oa'a)i UI- omo ? (aa�i = U � � = m * � �
0 2 . 0 - 0 - Ud Q. : U - .j °_m : 0 ° mcn : !nin
W
I-
0<
N- N- N-
E)
, ..-
a
r
� ,-
>- N co O O _
5 N co N M M M
m
U ti N- N
Q
TREE= Ow
• •
iWELLHEAD= FMC1 1 5-04B SAFETY/ NOTES: ETLLANGLE>70°@10396'.
ACTUATOR= BAKER C
OKB.ELEV= 63'
BF ELEV= 1 I
KOP= 3039'; ---i2199' �3-1 12"HES x NP,D=2.813"
Max Angle= 99°@ 10947'1
Datum MU= 94259°t 2451' H 9-5/8"X 7"BKR LNR TOP PKR D=???
l�tum TVD= 8840'SS 111
f/ r1' GAS LFT MANDRELS
441 i1i 4ST MD TVD DEV TYPE VLV 1 LATCH PORT" DATE
111 �j 4 3354 33421 19 M410 DONDE RK 16 01/22/08
13-318"CSG,72#,L-80 BTC.D=12-347" — 2649' 141� 3 5556 5217 34 MING SO RK 20 09/22108
11MN
1 �1 2 7286 6612 42 O DMY RK 0 01/30/04
11 11, I 1 8921 7798 42 M1AG MY RK 0 01/30/04
Minimum ID =0.25" @ 11030" 1 1/ •1
2-318" RETAINER w/ORIFICE 1 .4
111 j' 8980' H3-1/2"HES X NP,D=2.813"
1 I ��
�1�►Zt ►��1/, 9002' H7 X 3-1/2"PKR S-3 PROD PKR,D=3.875
11j' �.1.�
� I
�, � 9027' �—3-1J2°'t-1Es X NP,D=2.813^
1 3-1/2"TBG,9.2#,93CR-80 VAM TOP, I—{ 9080' '1 �1� 9087' 1 7 X 3-1/2"UNDUE OVERSHOT
1-0087 bpf,D=2.992" i 1 $4 �� "
1 /1 '•., 9112' 7-1/2"x 3-1/2'BKR FB-1 PKR D=4.0' '
/1/►Zi ►�r'1
1�i ■�!i 9115' j—3-1/2"BKR SEAL BORE EXTENSION
111 •4
'•
.4 ��
11 ,1 9124` -13-1/2"BKR CONCHNTRENIC COLIPL/VG
111 �1�
1 1, 9125' 1—3-1/2"BKR SEAL BORE EXTENSION
1 TOC I 9144' 11 a.,
(174a� (1/ 9130" —J 3-1/2"BKR MPLOIT EXTENSION
7"TIEBACK LNR,26#,L-80,-0383 bpf,D=6.276" H 9167' 141 , ir•1
1�' ��i ►1' '1 9144' 1-12.70-DEPLOY MBdT SLV,D=2.250"
11 4
,-` v4 k —, 9169' A--i9-5/8"X 4-112"BKR HYFLO HGRwtTEBACK
3-112"TBG,9.3#,L-80,.0087 bpf,ID=2.992" H 9202' 1 1/
111111 '111 1114 .,
9171' —�3 v2^oTtsxNr�?D-2.7s"
TOP OF 7"LNR H 9270' I X14' X11 111'11111+
11/114 i 11� ►111 'A♦ 9202' --13-1/2"VI/LEG,D=2.992"
.*II 4 11/114
11111111 ►1111//' HEM)ELN )11'LOGGED 12/04/90
A11 1111'
1, 1111
1111 11111
9-5/8"CSG,47#,L-80 BTC/SOO-95.0=8.681^ — 9688' 114.4 111 1
_ _ 1.11110 1111111
11/111.. 1111111
1111 11114
11114 N4'1
BAKER Nh-IPSTOCK(12/07/07) 06' 1111 1111'
J—! 98__ J 111101 ►004.14
►1114 1111
1111 11114 Ml LO IT WNDOW(15-048) 9808'-9816'
1/N1 1111
1RA TAG(12/12/07)_1-1 9813" 1111 1111 4
. 14111 X1104
PERFORATION SLAW RY 1014 14�,.
REF LOG. SWS ME DRY CNUGRJCCL ON 12/28/07 1•..4 4•..•�4 ♦ 11030' —2-3/8"YVFT/NS REr
/� x.1.1./. 1�
ANGLEAT TOP FBF 80°@ 10400' 111 11,111*1* �� .. w/0.25 ORFICE(7/30/17)
Note:Refer to FYoduction DB for historical perf data 111 16.•1•1.' .� AI
SIZE 1 SFE I MERVAL Opn/Sqz SHOT f SQZ its v t4 .1.I 1 el&a,,,,,,N *
"SEE PG 2 FOR PERF SUNWARY* 14 •.
1 I 1 �1 f1•1•1•1•1•1•.1 •*♦
111111111
Iii.6 j11111/1, CSP — 12704' 1 ''�
.:66.1111111111t1> __ �4*•14�i
1111111111
1114111114 � ?D.1— 12713'
4-1/2"SCAB LNR,12.6#.L-80,.0152 bpf,D=3.958" 10438' 444.4.4.0.4.4.4A _-- --
2-3/8"LNR,4.7#,L-80 STL, 0039- bpf.D=1.995' — 12860'
r LNR 29#,L-80,.0371 bpf,D=6.184" H 10460'
DATE REV BY 1 COMMENTS DATE REV BY 006/MENTS PRUDHOE BAY INT
3 04/26/82. ORIGINAL COMPLETION 06/17/14 CRN/JMD ADFERFS(06/08-09/14) WELL 15-04B
,12/04/90 LAST WORKOVER 109/27/16 AVID MNOR EDITS PER TBG TALLIESPERMT No:"2071380
01/18/04 DAV/KAK CTD SIDETRACK(15-04A) 07/31/17 JCF/JMD SET RET w/ORFICE&ADPERFS All No: 50-029-20726-02-00
1 01/04/08 NORDIC1'CTD SIDETRACK(15-04B) SEC 22,T11N,R14E,1206'FN..&237'FWL
02/08/08 TEL/PJC GLV CIO(01/22/08)
11/11/10 SM/JMD DIG DRAFT CCTIONS , i 1 1 BP Exploration(Alaska)
•
TREE= CNV • •
Wall-F
ACTUATOR
AR= FRC 15-04B
AcnwroR= BAKER
OKB.f3_EV= 63'
8F EiEV= ij
i
KOP= 3039'
it L
Max Angie= 99"@ 10947
I Datum MD= 10251' al
Datum TVD= 8800'SS .4 4
/ ►/
1/ •411 •
P.
/ ►/
1/ 1�4
14
144
.
11
;III°
►*4
1/ •l
PERFORATION SUMMARY RY /
1 ►1
REF LOG. SVC CNJGR/CCL ON 12/28/07 .SVC M�N1I
ANGLE AT TOP P89°@ 11090' 14 1,
ERF.
•
Note.Refer to Production DB for historical perf data /1 ►1.
SIZE SPF i INTERVAL Opn/Sgz SHOT SQZ ' 14 .•, rr 1�
1-11116" 6 10400-10432 0 07/29/17 i •. ./1 11� ,�I
1-11/16"1 6 ►111{10462-10494 0 07/29/17 •V ►jlj
1-11/16".1 6 10510-10642 0 07/28/17 1111 ��� 11111
1-11/16" !1 6 `10619-10651 0 07/28/17 X111 *14 111 ...�.►
1-11/16"I 6 111090- 11120 0 06/09/14 ///li//. 1.4/�1//4
1-11/16"1. 6 11120-11150 0 06/09/14 •1111111# 1111./111. ►
6 N•N4 1141,.. .
1-11/16"1 6 j'f 1150-11180 0 06/09/141111 1111 4
1111111 1/1/111
1-11116"; 6 11220 11250 0 06f08/14 A ►/11111 11111111
1-11/16" 6 111350'- 11450 0 01/04/08 11.114 111
1-11/16"; 6 111530-11640 0 01/04/08 111.111• ►111111
1-11/16"1 6 1 11670-11710 0 01/04/08 X111111* 11111114
1-11/16"I 6 111760- 11850 0 01/04/08 111111# 1111111
111920- 12140 0 01/04/08 1#`#111# 11111114
1-11/16" 6
1-11/16" 6 E 12210-12260 0 01/04/08 1:'11:1: 11111114
1144+4 ►..4.4
1-11/16" 6 112310-12350 0 01/04/08 141.11 4d.1
11-11/16"1 6 {12480- 12690 0 01/04/08 1* 1��1‘ �'
1 '_
i 11 1'1*V11* r1 •
I 1.11 1/#111,4 4
•
►11 v1vi11v1v1v i v ��•
1111111114
1/11�111111111111 * Alp,
p
/.1.1.1.1.111.1.1.1
DATE REV BY COMMENTS DATE REV BY 1 COMMENTS F &UHOE BAY UNIT
04/26182 ORIGINAL COMPLETION 06/17/14 CRR/14) ADPERFS(06/08-09/14) WELL 15-048
1 12/04/90 LAST WORKOVB2 09/27/16 JND MINOR EDITS PE12 TBG TALLES PERMIT No "2071380
01/18/04 DAV/KAK CTD SIDETRACK(15-04A) i 07/31/17 JCF/JM3•SET RET w/ORFFICE&ADFERFS AFI No 50-029-20726-02-00
01/04108 NORUC1 CTD SIDETRACK(15-04B) SEC 22,T11 N,R14E, 1206'FN_&237'FWL
1 1 02/08/08 i TEL/PJC'GLV CIO (01/22/08) - 1
• 11/11/10 f WAD DRLG CRAFTCORRECT/DNS � j BP Exploration(Alaska)
i
RECEIVED -� S23--
FEB 132017 • 279 ' 5
����
BAKER PRINT DISTRIBUTION LIST
HUGHES AOGCC Please sign and return one copy of this transmittal form to:
COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska)Inc.
Petrotechnical Data Center, LR2-1 DATA LOGGED
7-45 WELL NAME 15-04B 900 E. Benson Blvd. M.K BENDER
ivl.K.BENDS
Anchorage,Alaska 99508
FIELD Prudhoe Bay Unit to acknowledge receipt of this data.
COUNTY North Slope Borough LOG TYPE RPM:PNC3D
BHI DISTRICT Alaska
LOG DATE January 21,2017
AUTHORIZED BY Paul Canizares
EMAIL Paul.Canizares(a�bakerhughes.com TODAYS DATE February 10,2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY FIELD/ FINAL CD/DVD FINAL
PRELIM (las,dlis, PDF,META, SURVEY REPORT
ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO* LOGS LOGS CGM,Final Surveys) (Compass)
PERSON ATTENTION #OF PRINTS #OF PRIN I S #OF COPIES #OF COPIES #OF rCOPIES
VnV V V V
BP North Slope. 0 0 0 0 0
EOA,PBOC,PRB-20(Office 109)
D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker
900 E.Benson Blvd. Sati��� ,I�.,1 3 @("
Anchorage,Alaska 99508 1�{
2 ConocoPhillips Alaska Inc. 0 1 1 0 0
Attn:Ricky Elgarico
ATO 3-344
700 G Street
Anchorage,AK 99510
3 ExxonMobil,Alaska 0 0 1 0 0
Attn:Lynda M.Yaskell and/or Lisa Boggs
3201 C Street,Suite 505
Anchorage,AK 99503
4 State of Alaska -AOGCC 0 1 1 0 0
Attn:Makana Bender
333 W.7th Ave,Suite 100
Anchorage,Alaska 99501
5 DNR-Division of Oil&Gas *** 0 I 1 1 0 0
Attn:James Hyun
550 West 7th Avenue,Suite 802
Anchorage,Alaska 99501
stamp"confidentii'on all material deliver to DNR
6 BP Exploration(Alaska)Inc. 0 0 0 I 0 0
Petrotechnical Data Center,LR2-1
900 E.Benson Blvd.
Anchorage,Alaska 99508
Attn:David Itter
TOTALS FOR THIS PAGE: 0 3 4 0 0
TOTALS FOR ALL PAGES: 0 3 4 0 0
• •
Image Project Well history File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~ ~- ~ ~ Well History File Identifier
Organizing (aone>
~~,~=aea iiiimiiiuiiuii
. Re,~a~~eeaed ouiiiiiuiuuii
RES AN
Color Items:
^ Greyscale Items:
^ Poor Quality Originals:
^ Other:
NOTES: ^ Other::
BY: Maria Date: /s/
Project Proofing III II'lll VIII II III
BY: Maria Date: /s/ ~~
Scanning Preparation ~ x 30 = --~- + ~ =TOTAL PAGES
1 (Count does not include cover sheet) r/~ /~'
BY: Maria Date: '1'r7 //~l~ /s/ ~ I/'
Production Scanning
Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet)
Page Count Matches Number in Scan ing Preparation: --+~~ ' ES NO
BY: Maria Date: ~ ~ ®~ /s/ ~~
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
DIG/ITAL DATA
+~ Diskettes, No. 1
^ Other, No/Type:
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. II I II II II I II II I I III
ReScanned III IIIIIIIIIII VIII
BY: Maria
Date:
/s/
Comments about this file:
o~ , ~.~ke, iuuiimuimu
10/6/2005 Well History File Cover Page.doc
~Q
s
-~ ,~"`
F< ,~..
,~~ ~ ~ ~ P
y ~; .
~,~
"~ ~ '`
~ ~,. ~ a ,~, t r~
k.
~5~`
e
MICROFILMED
6/30!2010
DO NOT PLACE
ANY. N EW MATERIAL
UNDER THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
•
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
January 1, 2010
i~~~k~:''~~ J~~rl ~ ~ ~~~€
F~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission ~ ~ ~ ~~
333 West 7th Avenue ~ + '_
Anchorage, Alaska 99501 ~~- ~ "~
Subject: Corrosion Inhibitor Treatments of GPB DS 15
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
15 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
•
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
DS-15
Date: 01 /05/10
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
15-016 2042570 50029206960200- NA Sealed NA
15-026 2060720 50029206970200 NA Sealed NA
15-03 1820300 50029207220000 NA Sealed NA
15-046 2071380 50029207260200 NA Sealed NA
15-05A 1950340 50029207310100 NA Sealed NA
15-O6A 1982540 50029207420100 NA 6.7 NA 40.8 11 /7/2009
15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009
15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009
15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009
15-10A 1880850 50029205010100 NA Sealed NA
15-11 B 2041460 50029206530200 NA Sealed NA
15-12B 2060870 50029206650200 NA Sealed NA
15-13A 1991240 50029206450100 NA Sealed NA
15-14A 2042220 50029206820100 NA Sealed NA
15-15C 2081820 50029206910300 NA Sealed NA
15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009
15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009
15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009
15-19A 1990990 50029218290100 NA surface NA
15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009
15-21A 1990290 50029205030100 NA Sealed NA
15-22 1800970 50029205090000 NA Sealed NA
15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009
15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009
15-256 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009
15-26B 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009
15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009
15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009
15-296 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009
15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009
15-318 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009
15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009
15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009
15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009
15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009
15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009
15-376 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009
15-38A 2030160 50029224960100 NA Sealed NA
15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009
15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009
15-416 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009
15-426 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009
15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009
15-456 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009
15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009
15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009
15-486 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009
15-496 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009
DATA SUBMITTAL COMPLIANCE REPORT
12/9/2008
Permit to Drill 2071380 Well Name/No. PRUDHOE BAY UNIT 15-04B
MD 12865 TVD 8881 Completion Date 1/4/2008
REQUIRED INFORMATION
DATA INFORMATION
Mud Log No
Types Electric or Other Logs Run: MWD DIR / GR,GR /CCL /MCNL, SCMT /CCL / GR /PRESSURE /
Well Log Information:
Log/ Electr
Data Digital Dataset
Typle Med/Frmt Number Name
e~ _ _ __--- - --- --
ED D it i
Asc D ect onal Survey
Rpt Directional Survey
R
pt Directional Survey
a
/Cog Cement Evaluation
C Las 15946 ~amma Ray
(~D C Las 15947/Gamma Ray
ED C
i Lis 15953 ~amma Ray
~,.ec,( eutron
i
~ ~
`~
'
C Lis 16024
Neutron
pt
r~ Gamma Ray
~~//
"ED C Lis 16351 f~Gamma Ray
Cog Gamma Ray
6g
IItL Gamma Ray
/,
',"LOg See Notes
-~Ktpt Gamma Ray
C Lis 16352 /Gamma Ray
~og Gamma Ray
LCog Gamma Ray
~og See Notes
Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20726-02-00
Completion Status 1-OIL
Samples No
Current Status 1-OIL UIC N
Directional Survey
Log Log Run
Scale Media No
(data taken from Logs Portion of Master Well Data Maint
Interval OH /
Start Stop CH Received Comments
Svc iv icvva vNcn ii iwcuvo ro i vii uwrtcuc msu
10218 12865 Open 1/10/2008
10122 12141 Open 1/10/2008 PB 1
5 Col 1 8950 12646 Open 1/22/2008 MCBL, PSP CCL, GR,
Pres, Temp, CBL 28-Dec-
2007
9569 12865 Open 2/25/2008 LAS GR, ROP w./PDF
graphics
9569 12141 Open 2/25/2008 P61 LAS GR, ROP w./PDF
graphics
8900 12670 Case 2/28/2008 LIS Veri, GR, CCL w/PDS
and Tit graphics
2 Blu 8968 12687 Open 3/13/2008 MCNL, Lee CCL, GR, CNL
28-Dec-2007
8956 12699 Open 3/13/2008 LIS Veri, GR, CNL
9568 12865 Open 5/28/2008 LIS Veri, GR, ROP
9568 12865 Open 5/28/2008 LIS Veri, GR, ROP
25 Col 9806 12858 Open 5/29/2008 TVD GR
25 Col 9806 12858 Open 5/29/2008 MD GR
2 Col 9560 12660 Open 5/29/2008 Deth Shift Monitor Plot
9570 12120 Open 5/28/2008 PB1 LIS Veri, GR, ROP
9570 12120 Open 5/28/2008 PB1 LIS Veri, GR, ROP
25 Col 9806 12142 Open 5/29/2008 PB1 TVD GR
25 Col 9806 12142 Open 5/29/2008 P61 MD GR
2 Col 9568 12120 Open 5/29/2008 P61 Deth Shift Monitor Plot
~~
DATA SUBMITTAL COMPLIANCE REPORT
12/9/2008
Permit to Drill 2071380 Well Name/No. PRUDHOE BAY UNIT 15-046 Operator BP EXPLORATION (ALASKA) INC
MD 12865 TVD 8881 Completion Date 1/4/2008 Completion Status 1-OIL Current Status 1-OIL
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? YIN l
Chips Received? lRTtd-
Analysis 1'~#'"
Received?
Comments:
Daily History Received? ~:lN
Formation Tops P.a/ N
API No. 50-029-20726-02-00
UIC N
- - - ---
- - -
Compliance Reviewed By: _ _ _ _- __ __ Date: __ _..
i 1
BAKER
F~V6NE5
Faker Atlas
PRINT DISTRIBUTION LIST
CUMYANY BP EXYLURAl1UN (ALASKA) !!NC CUUNI'Y
WELL NAME 15-04B; IS-04BPB1 STATE
FIELD PRUDHOE BAY UNIT
THIS DISTRIBUTION LIST AUTHORIZED BY
NUR lH SLUYE BURUUGH
ALASKA
DATE 5/27/2008
CATRINA GUIDRY
SO #: 1718748
Copies of~ Copies Digital Copies of Copies Digital
Each Log of Film Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC Company
Person PETROTECHNICAL DATA CENTER Person
Address LR2-I Address
900 E BENSON BLVD.
ANCHORAGE. AK 99508
1 Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Person
Address 800 BELL STREET Address
GSC EMB 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE, AK 99501
1 Company DNR-DIVISION OF OIL & GAS Company
Person KRISTIN DIRKS Person
Address 550 WEST 7TH AVE Address
SUITE 802
ANCHORAGE. AK 99501
Company Company
Person Person
Address Address
i
Data Disseminated Bv: BAKER ATLAS-PDC 1701 S Aldine Westfield. Houston Texas 77073 ~ ~ '
This Distribution List Comnleted Bv:
• •
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7th Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: 15-04BPB1
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
'I
'~ 1 color prints - GR Directional Measured Depth Log (to follow)
1 color prints - GR Directional TVD Log (to follow)
LAC Job#: 1718748
Sent by: Catrina Guidry Date: OS/27E08 - -
Received by: ~ Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: ~9a') ~u7-6S~3
Baker Hughes INTEQ
~~~® 7260 Homer Drive ~ ~~ _.
~ Anchorage, Alaska 99518 _ ;'
Direct: (907) 267-6612
ItYTEQ FAX: (907) 267-6623
r ~
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7th Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: 15-04B
Contains the following: ~~ ~~ ~"
1 LDWG Compact Disc
'@ (Includes Graphic Image files)
1 LDWG lister summary '
1 color prints - GR Directional Measured Depth Log (to follow)
'` 1 color prints - GR Directional TVD Log (to follow)
LAC Job#: 1718748
Sent by: Catrina Guidry Date: 05/27/08 ~ c
Received by: ~ ~`~ , Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: ~9~i7j 2o7-ObL3
~~®
i~v i ~tl
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska 99518
Direct: (907) 267-6612
FAX: (907) 267-6623
r _ ~ -,~
t ,r' "
STATE OF ALASKA '~~~
ALASKA OIL AND GAS CONSERVATION COM SSION
~~~~1 V ~®
JA,N 3 1 2008
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~iaska Oil & Gas C®n~. COS~ln±ssion
~,n~~r
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b. Well Class:
20AAC 25.105 zoAAC zs.,,o ®Development ^ Exploratory
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic
2. Operator Name: 5. Date Comp., Susp., or Abanf~;~ 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 1/4/2008 .~"" 207-138
3. Address: 6. Date Spudded ~ 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 12/12/2007' S0-029-20726-02-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface:
'
' 12/25/2007- PBU 15-046
1206
FNL, 237
FWL, SEC. 22, T11 N, R14E, UM
Top of Productive Horizon: 8. KB (ft above MSL): 63' 15. Field /Pool(s): ,
1171' FNL, 3622' FEL, SEC. 21, T11 N, R14E, UM Ground (ft MSL): Prudhoe Bay Field / Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+TVD) Pool
989' FNL, 1294' FEL, SEC. 21, T11N, R14E, UM 12704 8890
4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD} 16. Property Designation:
Surface: x- 676169 y- 5960280 Zone- ASP4 12865-. 8881 ~. ADL 028306
TPI: x- 672311 y- 5960226 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit:
Total Depth: x- 674633 y- 5960462 Zone- ASP4 None
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (l1/D):
'
Submit electronic and rioted information er 20 AAC 25.050 N/A ft MSL 1900
(Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
! p~~ .
~
I
MWD DiR / GR, GR /CCL / MCNL, SCMT /CCL / GR /Pressure /Temp / CBL G•//~t/~d//C~~~~~
~TO~ ~d
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH' MD SETTING DEPTH TVD- HOLE AMOUNT
WT. PER FT. GRADE ' TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
20" 91.5# H-40 Surface 110' Surface 110' 30" 400 x Permafrost II
13-3l8" 72# L-80 Surface 2649' Surface 2649' 17-1/2" 2000 sx Fondu 400 sx PF'C'
9-5/8" 47# L-80 Surface 9588' Surface 8305' 12-1/4" 500 sx Class'G'
7" 29# L-80 9270' 8061' 8483' 8-1 /2" 350 sx'G p" 26# L-8Q Liner Tieback 2451' - 9167)
4-1/2" 12.6# L-80 9159' 9808' 7977' 8483' N/A Liner Tieback
2-3/8" 4.7# L-80 9144' 12860' 7965' 8881' 3" 73 sx Class'G' 97 sx Class'G'
23. Open to production or inject ion? ®Yes ^ No 24 Tue1NG RECORD
If Yes, IISt each i
(MD+TVD of Top & Bottom; Pe nterval Open
rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD
1.56" Gun Diameter
6 spf 3-1/2", 9.2#, 13Cr80 9087' 9002'
,
MD TVD MD TVD 3-1/2", 9.3#, L-80 9080' - 9202' 9112'
11350' - 11450' 8904' - 8907' FRACTURE
CEMENT SQUEEZE
ETC.
ACID
25
11530' - 11640' 8906' - 8906' ,
,
,
.
11670' - 11710' 8907' - 8909' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
11760' - 11850' 8909' - 8902'
11920' - 12140' 8899'
8904' 12704' Set CIBP
-
12210' - 12260' 8905' - 8903' 2500' Freeze Protected w/ McOH
12310' - 12350' 8903' - 8905'
2
2
'
'
'
'
1
480
- 1
690
8901
- 8890
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
January 28, 2008 Flowing
Date Of Test: HOUfS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
1/31/2008 4 TEST PERIOD 474 694 -0- 50 1,464
Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
Press. 507 1,680 24-HOUR RATE• 2,845 4,166 -0-
27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None _ ~~° t~~ 4
L~~-~--~--- `
~
.-,J
Form 10-407 Revised 0212007 ~~ ~ CONTINUED ON REVERSE SIDE ~~~~5 ~~ I ~' ~y~[
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS
NAME
` MD TVD Well Tested . ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
43SB 9823' 8496' None
42S6 /Zone 4A 9865' 8533'
Top CGL /Zone 3 9929' 8593'
Base CGL /Zone 2C 9983' 8645'
23SB /Zone 2B 10048' 8707'
22TS 10104' 8756'
21 TS /Zone 2A 10164' 8804'
Zone 1 B 10272' 8876'
TDF / Zone 1A 10322' 8909'
Formation at Total Depth (Name):
Zone 1 A 10322' 8909'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the fore oing is true and correct to the best of my knowledge. h
/
(/
hh
VS
Signed Terrie Hubble itle Drilling Technologist Date v
~~
PBU 15-048 207-138 Prepared By Name/Number.~ Terrie Hubble, 564-4628
Well Number Permit No. / A royal No. Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
BP EXPLORATION Page 1 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
12/9/2007 20:00 - 00:00 4.00 MOB P PRE Move off DS7-08B and move to DS15.Had power outage as rig
arrived on DS15 due to high engine temp.
12/10/2007 00:00 - 01:00 1.00 MOB P PRE Complete move to DS 15.
01:00 - 09:00 8.00 MOB N WAIT PRE Rig on standby.
Wait on Bleed down of well and site prep.
09:00 - 11:00 2.00 MOB N WAIT PRE Wait on pad prep. Blade pad in front of well. Survey and blade
11:00 - 12:00 1.00 MOB P PRE
12:00 - 12:15 0.25 MOB P PRE
12:15 - 13:00 0.75 MOB P PRE
13:00 - 17:30 4.50 BOPSU P PRE
17:30 - 21:00 I 3.501 BOPSUR P I I PRE
21:00 - 00:00 3.00 BOPSU P PRE
12/11/2007 00:00 - 05:30 5.50 BOPSU P PRE
05:30 - 07:00 1.50 BOPSU P PRE
07:00 - 08:30 1.50 RIGU P PRE
08:30 - 10:45 2.25 RIGU P PRE
10:45 - 11:00 0.25 RIGU P PRE
11:00 - 12:30 1.50 RIGU P PRE
12:30 - 13:15 I 0.751 RIGU I P I I PRE
13:15 - 14:00 0.75 RIGU P PRE
14:00 - 17:30 3.50 STWHIP P WEXIT
17:30 - 20:45 3.25 STWHIP P WEXIT
20:45 - 21:00 0.25 STWHIP P WEXIT
21:00 - 22:30 1.50 STWHIP P WEXIT
level for rig.
Installed SWS coiled tubing pipe straightener onto re-built 480
injecter head,
while waiting.
Move rig in front of well.
SAFETY MEETING. Review procedure, hazards and
mitigation for backing the rig over the well.
Back rig over well. Center rig over well and level rig.
ACCEPT RIG AT 1300 HRS, 12/10/2007.
Nipple up BOPE. Spot cuttings tank. Rig up hardline to Tiger
Tank.
Move in mini-camp and man camp.
Pressure and function test BOPE. Test witnessed by AOGCC
insoecter, Bob Noble.
Send test report to AOGCC. Swab not holding. Call out grease
crew Grease tree and pump open SSV.
Test BOP against master. Rebuild choke valve #3.
Continue with BOP test 250 psi low and 3500 psi hi.
PU Lubricator, PJSM, Stab lubricator and PT to 1000 psi.
Pull BPV with lubricator.
R/D lubricator. SIWHP = 200 psi.
M/U guide arch to injecter head after reel swap to 2" E-Coil and
C/O to re-built injecter.
Align injecter, pipe straightener and guide arch.
SAFETY MEETING. Review procedure, hazards and
mitigation for pulling 2" E-Coil to injecter.
Pull test grapple. Pull coil into injecter.
Align and calibrate pipe straightener. 800 psi hyd. press.
straightens 2", 110 coil.
Fill coil with 2# Biozan. Coil vol. = 40.0 bbls.
Circ. across top of stack thru kill line to shaker to clean stack.
Press test inner reel valve.
Reverse Circ thru coil at 3.2 bpm, 4150 psi. 3 times. Heard
e-line zing first time for 30 sec.
Cut coil to find E-Line. Cut 32' of coil.
M/U CTC and BHI UOC. E-Line tested OK.
Bleed off 200 psi WHP to tiger tank. Well is dead.
M/U Milling BHA #1 with 2.74" HCC diamond window mill, 2.73"
reamer, BTT Xtreme motor.
2 jts 2-1/8" CSH and BHI tools. BHA OAL = 99.81'.
RIH with 2.74" window milling BHA #1. Take returns to Tiger
tank.
Tag pinchpoint w/ pumps on at 9811'. Correct -3' to whipstock ~
pinch point at 9808'. Flag pipe.
Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 2800-3000
psi, full returns, 1 K WOB, 1 FPH.
Printed: 1/14/2008 8:58:28 AM
` ~
BP EXPLORATION Page 2 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task i Code NPT Phase Description of Operations
12/11/2007 21:00 - 22:30 1.50 STWHIP P WEXIT Milled to 9809'.
22:30 - 00:00 1.50 STWHIP P WEXIT Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 3100-3200
psi, full returns, 1.5K WOB, 1 FPH.
Milled to 9810.3'.
12/12/2007 00:00 - 02:00 2.00 STWHIP P WEXIT Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 3200-3300
psi, full returns, 1.5K WOB, 1 FPH.
Milled to 9811.8'.
~~` ~,3 KICK WHILE DRILLING DRILL 02:00 HRS
02:00 - 04:00 2.00 STWHIP P WEXIT Mill 2.74" window. 1.5 bpm, 3300-3400 psi, full returns, 2.5K
WOB, 0.5 FPH.
Milled to 9813.0'.
04:00 - 06:00 2.00 STWHIP P WEXIT Mill 2.74" window. 1.5 bpm, 3450 psi, full returns, 3K WOB,
0.5 FPH.
Milled to 9814.0'.
06:00 - 09:00 3.00 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000
psi, 1-3K wob, 4 stalls at 9815'.
Milled to 9815'.
09:00 - 12:00 3.00 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000
psi, 1 K wob, A few stalls at 9816'.
12:00 - 14:20 2.33 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000
psi, 1 K wob, Exit window at 9816'. Milled formation at 10 fph
to 9826'.
14:20 - 15:30 1.17 STWHIP P WEXIT Ream window area. Swap to re-built FloPro. Stop pump and
RIH clean thru window.
Clean window.
15:30 - 17:30 2.00 STWHIP P WEXIT POH with milling BHA.
Top of window is at 9808'.
Bottom of window at 9816'.
Held Kick While tripping drill at 1630 hrs.
17:30 - 17:40 0.17 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for laying out milling BHA and picking up BHI Build
BHA.
17:40 - 18:15 0.58 STWHIP P WEXIT Lay out milling BHA. Mills gauged at 2.73/2.72" Go / No-Go..
18:15 - 19:30 1.25 DRILL P PROD1 M/U BHI Build MWD BHA #2 with HYC BC Bit #1, 1.5 deg
Xtreme motor and BHI tools. Stab injector.
19:30 - 22:45 3.25 DRILL P PROD1 RIH w/drilling build BHA #2. Tie in at 9600'. -8.5' correction.
a btm at 9827'.
22:45 - 00:00 1.25 DRILL P PROD1 Drilling build at 1.50/1.50 bpm @ 3250 psi FS = 2900 psi, WOB
1.2K, ECD 10.1, ROP 45 fph, TF 150R
Drilled to 9,865'.
12/13/2007 00:00 - 01:00 1.00 DRILL P PROD1 Drilling build at 1.58/1.58 bpm ~ 3300 psi, WOB 1.1 K, ECD
10.1, ROP 55 fph, TF 150R
Drilled to 9,908'.
01:00 - 03:00 2.00 DRILL P PROD1 Drilling at 1.60/1.60 bpm ~ 3200 psi, WOB 0.6K, ECD 10.1,
ROP 25 fph, TF 135R
Slow and hard drilling, frequent stalls.
Drilled to 9,950'.
03:00 - 03:15 0.25 DRILL P PROD1 Wiper to window.
03:15 - 06:00 2.75 DRILL P PROD1 Drilling at 1.50/1.50 bpm ~ 3100-3200 psi, WOB 1.1 K, ECD
10.1, ROP 20 fph, TF 90R
Hard drilling, frequent stalls.
Printed: 1/14/2008 8:58:28 AM
' ~
BP EXPLORATION Page 3 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To I Hours Task Code NPT I'~I Phase Description of Operations
12/13/2007 03:15 - 06:00 2.75 DRILL P
06:00 - 08:30 2.50 DRILL P
08:30 - 10:30 ~ 2.00 ~ DRILL ~ P
10:30 - 12:15 I 1.751 DRILL I P
12:15 - 12:45 0.50 DRILL P
12:45 - 16:00 3.25 DRILL P
16:00 - 16:30 0.50 DRILL P
16:30 - 18:00 1.50 DRILL P
18:00 - 19:30 I 1.501 DRILL I P
19:30 - 22:15 I 2.751 DRILL I P
22:15 - 23:15 1.00 DRILL P
23:15 - 00:00 0.75 DRILL P
12/14/2007 100:00 - 02:00 I 2.001 DRILL I P
02:00 - 03:45 I 1.751 DRILL I P
03:45 - 04:30 0.75 DRILL P
04:30 - 06:00 1.50 DRILL P
06:00 - 07:45 ~ 1.75 ~ DRILL ~ P
07:45 - 10:30 2.75 DRILL P
10:30 - 10:45 0.25 DRILL P
10:45 - 12:00 1.25 DRILL P
12:00 - 14:00 I 2.001 DRILL I P
PROD1 Drilled to 9,990'.
PROD1 Drilling Z3 and Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 80R TF,
.5-1 K WOB, 10.2 ECD, 15 fph, 14 deg incl,
Drilled to 10,040'.
PRODi Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K
WOB, 10.3 ECD, 15 fph, 20 deg incl,
Drilled to 10,070'.
PRODi Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K
WOB, 10.3 ECD, 15 fph, 20 deg incl,
Chert in samples. Drilled to 10,100'.
PROD1 Wiper trip to window. Clean hole. RIH clean to bottom.
PROD1 Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K
WOB, 10.3 ECD, 15 fph, 35 deg incl,
Chert in samples. Drilled to 10,142'.
PROD1 Wiper trip to window. Clean hole. RIH clean to bottom.
PROD1 Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K
WOB, 10.3 ECD, 15 fph, 40 deg incl,
Drilled to 10172'.
PROD1 Drilling Z2 at 1.68/1.68 bpm C~ 3600 psi, WOB 1.OK, ECD
10.5, ROP 25-50 fph, TF 50R, 49 deg incl.
Drilled to 10,219'.
PROD1 Drilling Z2 and Zi at 1.53/1.53 bpm ~ 3300-3500 psi, WOB
1.2K, ECD 10.4, ROP 40-50 fph, TF 50L, 58 deg incl.
Drilled to 10,300'.
PROD1 Wiper trip to window. Hole clean. Change out SLB depth
counter. Tie in, +1' correction. RIH clean to btm.
PROD1 Drilling Z1 at 1.58/1.58 bpm @ 3600 psi, WOB 1.3K, ECD
10.4, ROP 40 fph, TF 30L, 61 deg incl.
Drilled to 10,325'.
PROD1 Drilling Zi at 1.60/1.60 bpm C~ 3500-3600 psi, WOB 1.2K,
ECD 10.5, ROP 40-50 fph, TF 60L, 69 deg incl.
Drilled to 10,370'.
PROD1 Drilling Z1 at 1.65/1.65 bpm ~ 3900-4100 psi, WOB 3.5K,
ECD 10.6, ROP 60-80 fph, TF 45R, 78 deg incl.
Drilled to 10,450'.
PRODi Wiper trip to window. Hole clean. RIH clean to bottom.
PROD1 Drilling Zi at 1.55/1.50 bpm ~ 4000-4200 psi, WOB 3.5K,
ECD 10.6, ROP 60 fph, TF 60R, 88 deg incl. Occationally
stacking weight.
Drilled to 10,505'.
PROD1 Drilling Z1, 1.6 / 1.6 bpm, 3200-4200 psi, 88 deg incl, 120R
tt, Stacking wt,
Drilled to 10,590'.
PROD1 POH for lateral BHA.
PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for changing BHA.
PROD1 C/O Bit and C/O and adjust motor to 1.0 deg bend.
Installed SWS CoilTrak Version 8 software in Ops cab.
Installed Coil inspect system for measuring wall thickness of
coiled tubing.
BHA #3 OAL = 58.23'.
PROD1 RIH with BHA #3 LAT BHA with HCC BC Bit #2, 1.0 deg motor
and BHI MWD tools.
Printed: 1/14/2008 8:58:28 AM
' A
BP EXPLORATION Page 4 of 26
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name: 1
ell Name: 1
e:
Name:
From - To ~ 5-04
5-04
REENTE
NORDIC
NORDIC
Hours
R+COM
CALIST
1
Task '~~
PLET
A
Code ~
E
NPT 'i
Start
Rig
Rig
Phase
Spud Date: 3/24/1982
: 12/10/2007 End: 1/4/2008
Release: 1/4/2008
Number: N1
Description of Operations
12/14/2007 12:00 - 14:00 2.00 DRILL P PROD1 Circ at min. rate.
14:00 - 14:30 0.50 DRILL P PROD1 Log tie-in at RA tag, -10'.
14:30 - 15:00 0.50 DRILL P PROD1 RIH clean to bottom.
15:00 - 16:30 1.50 DRILL P PROD1 Drill Z1A Lateral, 1.5 / 1.5 bpm, 3300-4100 psi, 40-80 fph, 90
deg incl, 140R TF. 10.6 ecd,
Stacking wt. Drilled to 10,635'
16:30 - 17:45 1.25 DRILL P PROD1 Wiper trip to window. Swap to new FloPro. RIH clean to
bottom.
17:45 - 18:45 1.00 DRILL P PROD1 Drill Z1A Lateral, 1.65 / 1.65 bpm, 3400-4000 psi, 50 fph, 120R
TF. Stacking weight and frequent stalls
Drilled to 10664'
18:45 - 19:30 0.75 DRILL P PROD1 Wiper trip to window to see if drilling will improve. Hole clean.
19:30 - 20:45 1.25 DRILL P PROD1 Drilling Z1A lateral at 1.55/1.55 bpm C~ 3000-3300 psi, WOB
4K, ECD 10.1, ROP 15-30 fph, TF 60R, 87 deg incl. Slow
drilling.
Drilled to 10,690'.
20:45 - 22:15 1.50 DRILL P PROD1 Drilling Z1A lateral at 1.45/1.45 bpm C~ 3200-3500 psi, WOB
1-2K, ECD 10.1, ROP 70-90 fph, TF 110R, 90 deg incl.
Drilled to 10,730'.
22:15 - 00:00 1.75 DRILL P PROD1 Drilling Z1A lateral at 1.50/1.50 bpm ~ 3000-3200 psi, WOB
1-2K, ECD 10.1, ROP 20-40 fph, TF 80R, 90 deg incl.
Drilled to 10,800'.
12/15/2007 00:00 - 00:45 0.75 DRILL P PROD1 Wiper trip to window. Hole clean.
00:45 - 03:45 3.00 DRILL N DFAL PROD1 Found pinhole in coil when RIH at 10,058'. Shut down pumps,
flagged pinhole, spooled pinhole back onto reel. POOH while
pumping at 1 bpm.
Reel had a total running footage of 662,230' when it failed.
03:45 - 04:45 1.00 DRILL N DFAL PROD1 PJSM. S/B injector. UD lateral drilling BHA #3. Bit graded
1/1/i. 2 plugged nozzles on bit.
M/U nozzle to end of coil. Stab injector.
04:45 - 05:00 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for reel N2 blowdown.
05:00 - 05:45 0.75 DRILL N DFAL PROD1 Pump 10 bbls water spacer followed by 10 bbls McOH.
05:45 - 07:00 1.25 DRILL N DFAL PROD1 Slowdown reel with N2. Bleed off press to tiger tank.
07:00 - 07:45 0.75 DRILL N DFAL PROD1 Cut off CTC. M/U internal grapple. Pull test. Pull coil stub to
reel.
07:45 - 08:00 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for swapping reels using bridge crane.
08:00 - 10:00 2.00 DRILL N DFAL PROD1 Lower used E-coil reel onto trailer. Pick up new 2" E-coil reel
off of trailer.
10:00 - 12:15 2.25 DRILL N DFAL PROD1 New reel had a support bushing sticking out 1" to far from reel
flange.
Cut off 1" of support bushing on reel, to make it flush with
flange.
Secure reel on reel stand support and drive pins.
Slip and cut 45' of drill line while working on reel bushing.
12:15 - 14:00 1.75 DRILL N DFAL PROD1 M/U hardline inside reel and M/U E-Line bulkhead.
14:00 - 18:00 4.00 DRILL N DFAL PROD1 Pull test internal grapple and pull coil into injecter. Test E-line.
OK.
Fill coil with double slick water. Did slack management.
Pumped max rate with double slick water. E-Line did not
move. Fill coil with rig water and reverse circ at max rate, 3.3
bpm at 4400 psi. E-Line moved very well. Fill coil with FloPro.
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 5 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To ~ Hours ~ Task Code NPT ~ Phase ~~ Description of Operations
12/15/2007 18:00 - 21:00 3.00 DRILL N DFAL PROD1 Cut Coil back to E-Line. Calibrate pipe straightener while
cutting coil -set at 650 psi. Cut 30' of coil and exposed 10' of
eline. With only 1.1% slack of eline in coil decided to perform
slack management again. Fill coil with rig water and reverse
circ at max rate, 3.3 bpm at 4400 psi. E-line moved. Rig up to
reverse circ air thru coil. Blow back -5 bbls water w/air.
21:00 - 22:30 1.50 DRILL N DFAL PROD1 Cut Coil back to E-Line. Cut 10' of coil to expose E-line. E-line
only moved a few feet. Coil came off roller on end of
gooseneck. Had to remove stuffing box to get pinched section
of coil thru injector. Cut 16' of coil. Total of 56' of coil cut and
46' of E-line cut.
22:30 - 00:00 1.50 DRILL N DFAL PROD1 M/U SLB Kendall CTC and BHI UOC. E-Line tested OK.
12/16/2007 00:00 - 01:30 1.50 DRILL N DFAL PROD1 PT CTC to 3500 psi. M/U BHI Lateral MWD BHA #4 with HCC
BC Bit #2, 1 deg Xtreme motor and BHI tools. Stab injector.
01:30 - 02:00 0.50 DRILL N DFAL PROD1 RIH w/ lateral drilling BHA #4.
02:00 - 03:00 1.00 DRILL N SFAL PROD1 One of the gripper blocks came off of injector chains at 845'.
Stopped to replace block and inspect injector.
03:00 - 03:30 0.50 DRILL N SFAL PROD1 POOH to surface to inspect coil for damage -okay.
03:30 - 04:45 1.25 DRILL N DFAL PROD1 RIH w/ lateral drilling BHA #4 to 7623'.
04:45 - 05:00 0.25 DRILL N SFAL PROD1 Levelwind not working correctly. Investigate problem. Need
new brass pall for Levelwind.
05:00 - 05:30 0.50 DRILL N DFAL PROD1 RIH to 9702'
05:30 - 06:00 0.50 DRILL N WAIT PROD1 Wait for SLB to bring out new brass pall for Levelwind.
06:00 - 06:15 0.25 DRILL N SFAL PROD1 New part on location. Install new brass pall in Levelwind.
06:15 - 06:30 0.25 DRILL N DFAL PROD1 RIH thru window.
06:30 - 07:00 0.50 DRILL P PROD1 Log tie-in at RA tag, -7 ff.
07:00 - 07:30 0.50 DRILL P PRODi RIH clean to bottom. Tag bottom at 10,800'.
07:30 - 09:00 1.50 DRILL P PRODi Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 100R, 93 deg
incl, 60 fph, 10.6 ecd,
Drilled to 10888'.
09:00 - 10:40 1.67 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3000-3800 psi, 901, 93 deg
incl, 70 fph, 10.3 ecd,
Stacking wt. Drilled to 10,940'.
10:40 - 11:40 1.00 DRILL P PROD1 Wiper trip to window. RIH to bottom.
11:40 - 14:00 2.33 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 90L, 93 deg
incl, 70 fph, 10.5 ecd,
Drilled to 11040'.
14:00 - 15:00 1.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 100R, 92 deg
incl, 20 fph, 10.5 ecd,
Stacking wt. Drilled to 11,050'.
15:00 - 16:00 1.00 DRILL P PROD1 Wiper trip to window. RIH to bottom.
16:00 - 19:00 3.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3300-3700 psi, 2K WOB,
90R, 90 deg incl, 75 fph, 10.7 ecd,
Drilled to 11,200'.
19:00 - 19:45 0.75 DRILL P PROD1 Wiper trip to window. Hole clean.
19:45 - 20:15 0.50 DRILL P PROD1 Log tie-in at RA tag, +7' correction.
20:15 - 21:00 0.75 DRILL P PROD1 RIH clean to bottom.
21:00 - 22:30 1.50 DRILL P PROD1 Drill Z1A lateral, 1.60 / 1.60 bpm, 3350-3800 psi, 3K WOB,
70R, 90 deg incl, 45-55 fph, 10.7 ecd.
Drilled to 11,272'.
22:30 - 23:45 1.25 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3500-3900 psi, 1.5-2K WOB,
110R, 92 deg incl, 85-100 fph, 10.8 ecd.
Drilled to 11,350'.
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 6 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date ~' From - To Hours Task Code NPT i Phase Description of Operations
12/16/2007 23:45 - 00:00 0.25 DRILL P PROD1 Wiper trip to window. 10K Overpulls at 11040', 10970'.
12/17/2007 00:00 - 01:15 1.25 DRILL P PROD1 Continue wiper trip to window. RIH to bottom.
01:15 - 03:00 1.75 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3550-3850 psi, 1.5-2K WOB,
60L, 90 deg incl, 75-100 fph, 10.9 ecd.
Drilled to 11,440'.
03:00 - 04:00 1.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3600-3900 psi, 1-2K WOB,
60L, 88 deg incl, 100-125 fph, 10.9 ecd.
Drilled to 11,500'.
04:00 - 05:40 1.67 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean.
05:40 - 06:00 0.33 DRILL P PROD1 Drill Zi A lateral, 1.6 / 1.6 bpm, 3750 psi, 1 K WOB, 100L, 90
deg incl, 120 fph, 11.0 ecd.
Drilled to 11,538'.
06:00 - 07:40 1.67 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3300-4100 psi, 1-2K WOB,
100R, 89 deg incl, 80 fph, 11.2 ecd.
Swapped to new FloPro. Drilled to 11,650'.
07:40 - 09:15 1.58 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean.
Log GR tie-in. Added 7' to CTD.
09:15 - 11:20 2.08 DRILL P PROD1 Drill Z1A lateral with new FloPro,
1.6 / 1.6 bpm, 3100-3800 psi, 1-2K WOB, 90R, 93 deg incl,
100 fph, 10.5 ecd.
Drilled to 11,798'.
11:20 - 13:15 1.92 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean.
13:15 - 15:45 2.50 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 120R, 94 incl,
2-3K wob, 120 fph,
Drilled to 11925'.
15:45 - 16:10 0.42 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 80L, 94 incl,
1-3K wob, 160 fph,
Drilling good sand. Drilled to 11,960'.
16:10 - 17:40 1.50 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean.
17:40 - 18:45 1.08 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3350 psi, 90L, 92 incl, 1-2K
wob, 30-50 fph, 10.7 ECD.
Drilled to 12,020'
18:45 - 20:45 2.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3600-3900 psi, 180L, 91 incl,
2-3K wob, 60-80 fph, 11.0 ECD.
Drilled to 12,100'
20:45 - 23:15 2.50 DRILL P PROD1 Wiper trip to window. Log GR tie-in. +10' correction.
RIH to bottom. Hole clean
23:15 - 00:00 0.75 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3500-3800 psi, 15L, 94 incl,
1-2K wob, 30-50 fph, 10.9 ECD.
Drilled to 12,130'
12/18/2007 00:00 - 01:30 1.50 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3400-3800 psi, 60L, 94 incl,
1-2K wob, 10-20 fph, 10.8 ECD.
Stacking weight, hard to make any hole. Drilled to 12,141'
KICK WHILE DRILLING DRILL 0100 HRS
01:30 - 05:00 3.50 DRILL P PROD1 POOH to P/U Agitator.
05:00 - 06:30 1.50 DRILL P PROD1 PJSM. S/B injector. L/D lateral drilling BHA #4. Bit had 3
plugged nozzles on pilot.
Meanwhile SLB installed CT inspect.
06:30 - 07:30 1.00 BOPSU P PROD1 Jet stack with swizzle stick. Function test BOPE, weekly test.
07:30 - 07:40 0.17 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for making up the drilling BHA.
07:40 - 08:30 0.83 DRILL P PROD1 M/U BHI LAT BHA #5, with HCC BC Bit #4, 1.0 deg Xtreme
Printed: 1/14/2008 8:58:28 AM
• ~
BP EXPLORATION Page 7 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours I Task Code NPT Phase Description of Operations
12/18/2007 ~ 07:40 - 08:30 0.83 DRILL P PROD1 motor, Agitator and BHI tools.
08:30 - 09:45 1.25 DRILL P
09:45 - 10:30 0.75 DRILL C
10:30 - 12:00 1.501 DRILL l C
OAL = 66.08'.
Check SWS coil inspect tool, working OK.
Open EDC
PROD1 RIH with BHA #5, circ at minimum rate. Stop at 4600'.
PROD1 POH with Lateral BHA.
PROD1
12:00 - 16:00 4.00 DRILL ~ X ~ SFAL PROD1
16:00 - 16:15 0.25 DRILL C PROD1
16:15 - 18:15 2.00 DRILL X SFAL PROD1
18:15 - 19:10 0.92 DRILL C PRODi
19:10 - 19:25 0.25 DRILL C PROD1
19:25 - 21:00 1.58 DRILL C PRODi
21:00 - 21:10 0.17 DRILL C PROD1
21:10 - 22:15 1.08 DRILL C PROD1
22:15 - 22:55 I 0.671 DRILL I C I I PROD1
22:55 - 23:30 0.58 DRILL C PRODi
23:30 - 00:00 0.50 DRILL C PROD1
12/19/2007 ~ 00:00 - 01:15 ~ 1.25 ~ DRILL ~ C ~ ~ PROD1
01:15 - 01:45 ~ 0.501 DRILL ~ C ~ ~ PROD1
01:45 - 02:30 ~ 0.75 ~ DRILL ~ C ~ ~ PROD1
02:30 - 03:00 0.50 DRILL C PROD1
03:00 - 04:00 1.00 DRILL C PROD1
04:00 - 04:30 I 0.501 DRILL I C I I PROD1
Change in well plan. Asset would like to open hole sidetrack
well at 10,270', to access reserves earlier in the polygon.
Lay out Lateral drilling BHA #5.
M/U Open hole sidetracking BHA #6, with HCC R60
sidetracking bit #5 Brass guide basket and 1.9 deg Xtreme
motor.
P/U to stab injector. Off driller side of spreader bar from bridge
crane in reel house spooled down and came into contact w/ the
coil reel.
Investigate cause of incident w/ Herb Williams, BP HSE
advisor. See remarks section
Respooled bridge crane winches and secured spreader bar
with chains and beam clamps.
PJSM. Stab injector.
When stabbing coil into BHA, UOC caught edge of LOC and
was damaged. S/B injector. Replace Flow Sub, LOC, and
UOC housing. E-line tested good.
RIH to 2781'MD
Change Packoffs on SLB injector
RIH 95 fpm, Flow in=0.4, Flow out=0.6, PVT=247
Tie-in at RA tag, -11' correction
RIH through window, try to knock brass cone from bit ~ 10,738
by orienting 180 out from as-drilled TF. 1.6 bpm in, 1.6 bpm
out, 3560 psi circulating pressure. IA=40 psi, OA=11 psi. PVT
= 269. Cont RIH to 11350 at 180 out trying to see motor work
or DWOB. No luck.
RIH to bottom to knock off brass ring at 50 fpm. Tag bottom,
good stall. Assume ring is now gone.
Pull up hole to sidetrack point at 50 fpm. 1.5 bpm, 3280 psi.
Park at 10. 270 MD, paint flag, PUH/backream at 50 fph to
10,250 MD, StrWt 26,630#, 1.5 bpm in, 1.5 bpm out, Cir press
3450 psi, PVT=247, IA=46psi, OA=31 psi
Ream 10235' - 10,270' 20fph, 1.5 bpm in, 1.5 bpm out, cir
press 3362 psi, Str wt 11690 Ibs, PVT = 242, IA =48 psi, OA=
42 psi
30' trough up at 50 fph, trough only 10' and already showing
10 deg drop on inclination from parent well.
Decide to go ahead and drill ahead rather than trough. Start
drilling ahead at 12,271'MD at 8 fph, TF 130R. 1.5 bpm in, 1.5
bpm out, cir press 3406, Str wt 9935 Ibs. DWOB 2.77K-Ibs,
PVT = 240, IA = 51, OA=63.
Drilling TF 90R, 8 fph, 1.5 bpm, 10,276'MD-10,280'MD, DWOB
= 0.5K Ibs
Drilling TF 30R, 13 fph, 1.5 bpm, 10,276'MD-10,280'MD,
DWOB = 0.6K Ibs
Drilling TF 20R, 18 fph, 1.5 bpm, 10,280'MD-10,300'MD PVT=
Printed: 1/14/2008 8:58:28 AM
~ ~
BP EXPLORATION Page 8 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
12/19/2007 04:00 - 04:30 0.50 DRILL C PROD1 215, IA=52 psi, OA = 90 psi, DWOB = 0.7K Ibs, cir press =
3450 psi
04:30 - 06:45 2.25 DRILL C PROD1 POOH for 2.3 deg motor to finish build and land well
06:45 - 07:00 0.25 DRILL C PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for UD open hole sidetrack BHA and M/U drilling
build BHA.
07:00 - 07:15 0.25 DRILL C PROD1 S/B injector. UD open hole sidetrack BHA #6.
07:15 - 08:00 0.75 DRILL C PROD1 M/U drilling build BHA #7 with HCC BC Bit #6, 2.3 deg Xtreme
motor and BHI tools. Stab injector.
08:00 - 10:45 2.75 DRILL C PROD1 RIH w/drilling build BHA. Tie-in at RA Tag. -11' correction.
RIH to bottom.
10:45 - 11:30 0.75 DRILL C PROD1 Drilling build at 1.5/1.5 bpm ~ 3700-4100 psi, WOB 1.5-2K,
ECD 10.8, ROP 50 fph, TF 15R, 51 deg incl. Stacking weight.
Drilled to 10,330'.
11:30 - 12:00 0.50 DRILL C PROD1 Backream to 10220' at 2.6 fpm, 1.6 / 1.6, 3700 psi.
12:00 - 13:00 1.00 DRILL C PRODi Drilling build at 1.6/1.6 bpm ~ 3700-3900 psi, WOB 1.5-2K,
ECD 10.8, ROP 40-80 fph, TF 15R, 60 deg incl.
Drilled to 10,358'.
13:00 - 15:45 2.75 DRILL C PROD1 Not getting enough dogleg to land at planned 8,867' TVD. With
current doglegs we are projected to land in shale at 8,880'.
Decided to POOH for higher bend motor.
15:45 - 16:15 0.50 DRILL C PROD1 S/B injector. UD drilling build BHA #7.
16:15 - 17:15 1.00 DRILL C PROD1 M/U drilling build BHA #8 with HCC BC Bit #7, 2.7 deg Xtreme
motor and BHI tools. Overall BHA length = 58.23'.
Stab injector.
17:15 - 19:00 1.75 DRILL C PROD1 RIH w/drilling build assembly w/ 2.7 deg motor. 0.26 in/0.61
out, 100 fpm
19:00 - 19:24 0.40 DRILL C PROD1 Close EDC at 9753' MD, Tie-in at RA tag. -10 correction.
19:24 - 19:46 0.37 DRILL C PROD1 RIH open hole, no problems at window or sidetrack point with
2.7 deg motor.
19:46 - 22:15 2.48 DRILL C PROD1 Drill from 10,358- 10,455, Cir Press = 3859 psi, 1.5 in/1.5 out,
PVT= 214 (begin mud swap to new flo-pro), AP=4958 psi,
DWOB=2.5K Ibs, Str Wt 10,540 Ibs -Landed 12' low,
significantly less DLS than expected from 2.7 deg bend motor.
22:15 - 00:00 1.75 DRILL C PROD1 At 10,455' MD -POOH for lateral BHA, New mud, PVT 302 bbl,
1.8 in/1.7 out, Cir Press = 3512 psi
12/20/2007 00:00 - 00:30 0.50 DRILL C PROD1 POOH for 1.1 degree motor
00:30 - 00:45 0.25 DRILL C PROD1 PJSM for BHA handling and cutting 100' coil
00:45 - 01:30 0.75 DRILL C PROD1 Lay down CoilTrak, remove CT connector
01:30 - 02:45 1.25 DRILL C PRODi Cut 100' of Coil, circulate coil
02:45 - 03:45 1.00 DRILL C PRODi Makeup CT connector
03:45 - 04:45 1.00 DRILL C PROD1 Begin reheading, coil frozen, put boot on Eline, RIH to unthaw
coil, circulate, POOH
04:45 - 05:30 0.75 DRILL C PROD1 Rehead Baker UOC
05:30 - 06:30 1.00 DRILL C PRODi MU CoilTrak BHA #9 w/ bit #8/Stab onto well
06:30 - 07:15 0.75 DRILL X DFAL PROD1 BHI tools testing abnormally on surface. S/B injector. C/O
orienter and DGS sub.
07:15 - 07:30 0.25 DRILL X DFAL PROD1 M/U BHI lateral drilling BHA. Stab injector.
07:30 - 10:30 3.00 DRILL C PROD1 RIH w/ lateral drilling BHA #9. Tie in at RA tag. -11.5'
correction. RIH clean to bottom.
10:30 - 12:00 1.50 DRILL C PROD1 Drill lateral, 1.55 / 1.55 bpm, 3300-3600 psi, 90L, 96 incl,
2-2.5K wob, 100-125 fph, 10.2 ECD.
Printed: 1/74/2008 8:58:28 AM
~ ~
BP EXPLORATION
Operations Summary Report
Page 9 of 26
',Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours II Task Code NPT Phase Description of Operations
12/20/2007 10:30 - 12:00 1.50 DRILL C PROD1 Drilled to 10 538'
12:00 - 12:30 0.50 DRILL C PROD1 Drill lateral, 1.55 / 1.55 bpm, 3500-3800 psi, 120L, 94 incl,
2-3K wob, 150 fph, 10.3 ECD.
Drilled to 10,610'
12:30 - 13:15 0.75 DRILL C PROD1 Wiper trip to window. Hole clean. RIH clean to bottom.
13:15 - 14:15 1.00 DRILL C PROD1 Drill Z1A lateral, 1.55 / 1.55 bpm, 3600-3850 psi, 90R, 93
incl, 2-3K wob, 130-150 fph, 10.3 ECD.
Drilled to 10,750'
14:15 - 15:10 0.92 DRILL C PROD1 Wiper trip to window. Hole clean. RIH clean to bottom.
15:10 - 16:30 1.33 DRILL C PROD1 Drill Z1A lateral, 1.5 t 1.5 bpm, 3300-3700 psi, 120R, 93 incl,
2-3K wob, 30-80 fph, 10.4 ECD.
Drilled to 10,801'
16:30 - 18:00 1.50 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3400-4000 psi, 30R, 93 incl,
1-2K wob, 10-20 fph, 10.4 ECD.
Stacking weight, hard drilling.
Drilled to 10,809'
WELL KILL DRILL 1730 HRS
18:00 - 21:13 3.22 DRILL C PROD1 Drilling on hard spot 10809 - 10840 MD, ROP = 11 fph, still
getting good motor work. 3300 psi, PVT=302, 90R, 10.4 ECD.
Bad spot in coil here, drill with minimal DWOB = 0.7K.
Gamma-ray 120 API Shale
21:13 - 22:30 1.28 DRILL C PROD1 Drilling 10840 - 10860 MD, ROP 30 fpr Free spin 3100 psi,
Drilling 3420 psi, PVT= 310,
1.53 in/1.53 out, Gamma-ray 70 API sand
22:30 - 00:00 1.50 DRILL C PROD1 Drilling 10,860 - 10,885 ROP 22 fph, Free spin 3100 psi,
Drilling 3320 psi, PVT= 304, 1.5 in/1.5 out, DWOB 2K, IA=57,
OA=129
12/21/2007 00:00 - 00:40 0.67 DRILL C PROD1 Wiper trip to window
00:40 - 01:10 0.50 DRILL C PROD1 Tie-in to RA tag +2' correction, RIH 1.4in / 1.53 out, PVT 297
bbl.
01:10 - 01:50 0.67 DRILL C PROD1 Drilling 10,885 -10,889'MD, Stacking, stalling, slow ROP
<10fpr, 3490 psi, 1.6in / 1.59 out, PVT = 294bb1s, IA=60,
OA=139
01:50 - 04:35 2.75 DRILL C PROD1 Drilling 10,889' MD - 11,039' MD, 70-100 fph, 3800 psi,
1.6in/1.60out, PVT=292bb1s, IA=60, OA=148, DWOB = 1 K,
ECD=10.76, Inc= 95 deg, TF=150R, ECD=10.8#/gal,
Gamma-ray=55 API
04:35 - 06:00 1.42 DRILL C PROD1 Wiper trip to window -clean
06:00 - 07:30 1.50 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3400-3600 psi, 160R, 93 incl,
2.5-3.5K wob, 10 fph, 10.7 ECD.
Drilled to 11,052'
07:30 - 10:00 2.50 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-3800 psi, 120R, 90 incl,
1.5-2K wob, 60-80 fph, 10.7 ECD.
Drilled to 11,125'
10:00 - 11:45 1.75 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3600-3800 psi, 110L, 87 incl,
1.5K wob, 60-80 fph, 10.8 ECD.
Drilled to 11,198'
11:45 - 13:15 1.50 DRILL C PROD1 Wiper trip to window. RIH to bottom. Hole clean.
13:15 - 15:00 1.75 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3600-3700 psi, 50R, 87 incl,
4-5K wob, 5-10 fph, 10.8 ECD.
Getting some motor rubber over shakers. Pump 30 bbls high
vis pill.
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 10 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date 'From - To II Hours Task Code NPT Phase Description of Operations
12/21!2007 13:15 - 15:00 1.75 DRILL C PROD1 Drilled to 11,210'
15:00 - 17:45 2.75 DRILL X DFAL PROD1 POOH to check motor and bit.
17:45 - 18:00 0.25 DRILL X DFAL PRODi S/B injector. UD lateral drilling BHA #9.
18:00 - 20:00 2.00 DRILL X DFAL PRODi PJSM, Change out bit (Id HCC/pu Hycalog), motor and PU
agitator, drop dual checks in UOC, circulate through bung hole
entire time out of the hole at 0.5 bpm
20:00 - 21:30 1.50 DRILL X DFAL PRODi RIH at 83 fpm, .2 in/ .64 out, PVT = 217 bbl
21:30 - 22:15 0.75 DRILL X DFAL PROD1 Kick While Tripping Drill/Tie-in at window, PVT = 253, -10'
correction
22:15 - 23:00 0.75 DRILL X DFAL PROD1 RIH from window 9806' MD, 30 fpm, .33in/.43out, 1700 psi,
PVT=254, slight bobble at 10,285', otherwise very clean
23:00 - 23:15 0.25 DRILL C PROD1 Drill 11,210' MD, PVT=256 bbl, 1.3in/1.3out, 4050 psi, IA=60,
OA=82, Str Wt=11,212 Ibs,
""Pressure too high for flow rate, circulate, dropped 500 psi
suddenly"""
23:15 - 23:25 0.17 DRILL C PROD1 Precautionary 200' wiper to assure if blew something through
bit we have it moving up hole past the BHA
23:25 - 00:00 0.58 DRILL C PROD1 Tag bottom to start drilling, freespin 3900 psi, pressures came
up again, pull up hole, DeltaP across BHA drops from 1300 psi
to 1000 psi at same flow rate, go back to bottom
12/22/2007 00:00 - 00:20 0.33 DRILL C PROD1 RIH 1.5in/1.5out
00:20 - 01:00 0.67 DRILL C PROD1 Drilling 11,213' - 11,221'MD -Cir pressures normal now, delta
P across BHA=900psi, Cir Prss=3995 psi,l.3in/1.3out,
PVT=252, Cir pressure(and downhole delta P) sometimes
increases 400psi.
01:00 - 03:00 2.00 DRILL C PROD1 Drilling 11,221' MD, delta P seems to be stabilizing at 800 psi
free spin, DH vibration -active now, ROP good increases to 63
fph, appears agitator was locking up, but now appears stable.
Cir Press = 4500 psi, 1.4in/1.4out, PVT=250, DWOB 1.8K, 91
deg inclination
03:00 - 04:30 1.50 DRILL C PROD1 Drilling 11,286- 11,321 MD, agitator has periods of not working,
worked for 55' then quit, Cir Press = 4285, 1.4in/1.4out, DWOB
= 3.5K, ROP = 45 fph, Start mud swap, ECD = 11.0
04:30 - 05:15 0.75 DRILL C PROD1 Drilling 11,321 - 11,350, New mud to surface, Cir Press 3770
psi, 1.45 in/1.42out, DWOB 2.7K, ROP 60 fph, ECD=10.2
05:15 - 06:45 1.50 DRILL C PROD1 Wiper trip to window, Cir Press=3582 psi, 1.6 in/1.4 out,
PVT=295 bbl
06:45 - 07:45 1.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-3700 psi, 90R, 89 incl,
1-2K wob, 55-80 fph, 10.2 ECD.
Drilled to 11,420'
07:45 - 09:45 2.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-4000 psi, 100L, 90 incl,
1-3K wob, 30-90 fph, 10.3 ECD.
Drilled to 11,500'
09:45 - 11:30 1.75 DRILL C PROD1 Wiper trip to window. RIH to bottom. Hole clean.
11:30 - 13:00 1.50 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3300-4000 psi, 150L, 91 incl,
1.5-3K wob, 80-100 fph, 10.3 ECD.
Drilled to 11,570'
~ 13:00 - 14:00 1.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3400-3800 psi, 150L, 92 incl,
1.5K wob, 100 fph, 10.3 ECD.
Drilled to 11,650'
14:00 - 16:10 2.17 DRILL C PROD1 Wiper trip to window. 10K overpulls at 11,240' and 11080'.
Tie-in to RA tag. +11' correction. RIH clean to bottom.
16:10 - 18:00 1.83 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3400-3900 psi, 30L, 97 incl,
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 11 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours 'I Task Code NPT Phase Description of Operations
12/22/2007 16:10 - 18:00 1.83 DRILL C PROD1 1-3K DWOB, 60-100 fph, 10.4 ECD.
Drilled to 11,740'
18:00 - 19:15 1.25 DRILL C PROD1 Drilling Z1A lateral to 11,800 MD
19:15 - 21:21 2.10 DRILL C PROD1 Wiper trip to window. 3K overpull at 11,300', 10,850' and 10K
overpull 11000'. RIH clean to bottom.
21:21 - 22:20 0.98 DRILL C PROD1 Drilling at 11,800 - 11,907MD, 1.5 / 1.5, 4100 psi, 60L, 1.5
DWOB, 10.7 ECD, Str Wt 10,950 lbs., ROP 85 fph
22:20 - 22:45 0.42 DRILL C PROD1 Drilling Z1A lateral 11,907-11,932'MD, 1.4 / 1/4, 4000 psi, 1.5,
PVT=277, 1.5 DWOB, 10.8 ECD, Str Wt. 10,750
22:45 - 00:00 1.25 DRILL C PROD1 Work pipe, acts like differential sticking, drilling at 11,932'MD
12/23/2007 100:00 - 00:15 I 0.251 DRILL I C I I PROD1
00:15 - 01:30 1.251 DRILL C PROD1
01:30 - 02:25 0.92 DRILL C PROD1
02:25 - 03:25 1.00 DRILL C PROD1
03:25 - 04:25 1.00 DRILL C PROD1
04:25 - 06:45 2.33 DRILL C PROD1
06:45 - 07:30 0.75 DRILL C PROD1
07:30 - 11:00 3.501 DRILL P PROD1
11:00 - 12:15 1.25 DRILL P PROD1
12:15 - 13:00 0.75 DRILL N RREP PROD1
13:00 - 15:00 2.00 DRILL P PROD1
15:00 - 16:00 1.00 DRILL P PROD1
16:00 - 20:00 4.00 BOPSU P PROD1
20:00 - 22:15 2.25 BOPSU P PROD1
22:15 - 23:15 1.00 DRILL P PROD1
23:15 - 00:00 0.75 DRILL P PROD1
12/24/2007 100:00 - 01:45 I 1.751 DRILL I P I I PROD1
when motor work drilled off while trying to add weight, unable to
pickup. Work pipe to 65K up and down 15 minutes, freed.
Drilling 11,932-11,937' MD, 1.4in/1.4out, 4250 psi, PVT=275,
IA=66, OA=211, Str Wt 11,936 Ibs, ECD 10.7, acts like
differential sticking.
Wiper trip to window, precautionary for hole cleaning and
differential sticking, 1.3in/1.3out, 3200 psi, 10.4 ECD at
window, Tie-in at RA tag, +11' correction, No overpulls
RIH, 1400 psi, .3in/.3out, 10.0 ECD
Drill 11,948'-12,031 MD, 1.4in/1.4out, 4140 psi, PVT=260,
IA=66, OA=210, StrWt 11,9521bs, ECD=10.84, DWOB=I.8K,
110 fph
Drill 12,031' - 12,106'MD, 1.3in/1.3out, 3800 psi, PVT=256,
IA=66, OA=212, Str Wt 12,060 Ibs
Wiper trip to window 3400 psi, 1.3 in/1.15 out coming OOH,
ECD 10.7, Str Wt = 12,069 Ibs up, 1.1 in/1.3 out when RIH
Drill Z1A lateral, 1.2 / 1.2 bpm, 3800-4100 psi, 120L, 89 incl,
1-2K wob, 90-100 fph, 10.9 ECD.
Drilled to 12,140'
Drill Z1A lateral, 1.2 / 1.2 bpm, 3800-4200 psi, 90R, 87 incl,
2-3K wob, 10-30 fph, 11.1 ECD.
Stacking weight, hole sticky. Agitator does not seem to be
working properly. Swap hole over to new Flo-Pro.
Drilled to 12,224'
Wiper trip to window. Hole clean.
Pull up thru window and park coil in casing.
Bob Sleightam w/ Sawyer Systems testing reel house bridge
cranes after making safety alterations to hydraulic system.
Bridge crane tests okay.
POOH to surface to C/O Agitator. Lost communication w/
MWD tools
S/B injector. Meg test E-line -okay. L/D lateral drilling BHA
#10. Bit graded 1/1/i. Bit was balled.
Pressure and function test ROPE - 250 psi low - 3500 psi high.
Test witness waived by AOGCC inspecter, Chuck Scheeve.
Send test report to AOGCC.
Continue testing BOPE.
Open Master, Check Pressure, well on slight vac, PJSM for
BHA pick up, check pipe straightener
RIH Straightening 8000' of coil. PVT = 259, IA=45, OA=17,
Tubing Speed 83 fpm, .3in/.4out
RIH straightening coil 77 fpm, PVT=274, Returns started at 3
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 12 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase it Description of Operations
12/24/2007 00:00 - 01:45 1.75 DRILL P PROD1 bbls, .34in/.61out, 1100 psi
01:45 - 01:55 0.17 DRILL P PROD1 Tie-in at RA tags, -8' correction
01:55 - 02:30 0.58 DRILL P PROD1 Run into open hole, 37 fpm, 1600 psi, .48in/.59out, IA=49,
OA=2, ECD=9.7, PVT = 308 at window
02:30 - 03:00 0.50 DRILL P PROD1 Tag w/ slight motor work at 11,036'MD, RIH 35 fpm,
.45in/.55out, 1549psi, 9.85=ECD
03:00 - 04:40 1.67 DRILL P PROD1 Drilling 12,224'-12,290' MD ,Agitator quit working at
04:40 - 05:40 1.00 DRILL P PROD1
05:40 - 06:10 0.50 DRILL P PROD1
06:10 - 08:40 2.50 DRILL P PROD1
08:40 - 09:30 0.83 DRILL P PROD1
09:30 - 11:30 2.00 DRILL P PROD1
11:30 - 15:30 4.00 DRILL P PROD1
15:30 - 16:45 1.25 DRILL P PRODi
16:45 - 18:15 1.50 DRILL P PROD1
18:15 - 19:30 1.25 DRILL P PROD1
19:30 - 21:15 1.75 DRILL P PRODi
21:15 - 23:15 2.00 DRILL P PROD1
23:15 - 00:00 0.75 DRILL P PROD1
12/25/2007 00:00 - 00:15 0.25 DRILL P PROD1
00:15 - 00:55 0.67 DRILL P PROD1
00:55 - 01:10 0.25 DRILL P PROD1
01:10 - 01:20 0.17 DRILL P PROD1
01:20 - 01:50 0.50 DRILL P PROD1
01:50 - 02:15 0.42 DRILL N DPRB PROD1
12,260'MD, PVT=303, 1.4in/1.4out, 3600psi, ECD = 10.66,
IA=50, OA=23, DWOB 2-4KIbs
Drilling 12,290'MD - 12,323 MD, PVT=294, 1.4in/1.36out,
4200psi, ECD= 10.75, IA= 55, OA=39, Str Wt=12,2941bs
Drilling 12,323 MD - 12,357' MD ,PVT=291, 1.4in/1.33out,
3800psi, ECD= 10.56, IA= 56, OA=49, Str Wt=12,3001bs
Wiper trip to window. Hole clean. RIH to bottom. Set down at
11190', 11280', P/U and run thru.
Drill Z1 A lateral, 1.4 / 1.4 bpm, 3900-4200 psi, 60L, 86 incl,
1-2K wob, 80-115 fph, 10.7 ECD.
Drilled to 12,415'
Drill Zi A lateral, 1.45 / 1.35 bpm, 4000-4250 psi, 90L, 93
incl, 1-2K wob, 60-90 fph, 10.9 ECD.
Hole getting differentially sticky. Losses at 5 bbls/hr. Drilled to
12,500'
Wiper trip to window. Having trouble getting thru shale section
around 11,350'. Ratty hole between 11200'-11350', worked
pipe to get thru.
Tie-in at RA tag, +15' correction.RlH to bottom. Ratty from
11210'-11360'
Drill Z1 A lateral, 1.4 / 1.4 bpm, 4000-4300 psi, 120L, 93 incl,
1-2K wob, 60-115 fph, 10.8 ECD.
Some differential sticking. Drilled to 12,580'MD
Drill Z1 A lateral, 1.4 / 1.4 bpm, 3900-4300 psi, 90L, 92 incl,
1-2K wob, 50-80 fph, 10.8 ECD.
Hole sticky. Losses have slowed.
Drilled to 12,650'MD
Wiper trip to window, 1.4in/1.2out, 3660 psi, 35 fpm up, IA=62,
OA=143, 10.8 ECD, PVT=243
RIH 1.2in/1.3out, 3350 psi, 28 fpm, PVT=231, Tag hard at
11,190'- 11,200'MD, Bobble /motor work 11,300'MD
Drilling 12,650' - 12,750'MD, 55 fph, 4300psi, 1.3in/1.3out,
PVT=235, 11.0 ECD
Drilling 12,750'-12,790'MD, 25 fph, 4200, 1.3in/1.3out,
PVT=227, 11.1 ECD
Drilling 12,970' - 12,800'MD, 4300psi, 1.3in/1.3out, PVT=225,
ECD=11.0
500' Wiper trip
Drilling 12,800' - 12,815'MD, 3400 psi, 1.3in/0 out, lost all
returns PVT = 195, ~"'8.6 ECD""
Circulate and monitor well - no returns
Drilling 12,815'-12,855'MD call TD, Drilled for cuttings to help
losses, PVT = 150 bbls, 9.82 ECD, 1.3 in/ 0 out
Pull up to the shoe and wait for mud and prepare for a
Form-a-Squeeze pill, PVT=137, 3280 psi, 9.9 ECD, 1.36 in/0
out
Printetl: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 13 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To ~ Hours Task 'Code' NPT '~ Phase ' Description of Operations
12/25/2007 02:15 - 02:45 0.50 DRILL N DPRB PROD1 Cont POOH 11,440'MD, PVT = 85, 2200 psi, .84 in/.14 out,
11,255'MD, 10k overpull
02:45 - 03:30 0.75 DRILL N DPRB PROD1 POOH at 10,782'MD to window, gamma tie-in, +17 correction,
pulling clean, PVT=82, 2200 psi, .84in/.12 out
03:30 - 06:00 2.50 DRILL N DPRB PRODi Circulate above window at 9670'-9425'MD, 1622psi,
.52in/.1out, PVT=119, Mixing Form-A-Squeeze pill, moving coil
at 12 fpm
06:00 - 08:00 2.00 DRILL N DPRB PROD1 Circulate 9440'MD, moving coil at 13 fpm, crew change, mixing
40bb1 Form-A-S ueeze 30 hi vis ill taking on new 8.5ppg
Flo-Pro mud to pits
08:00 - 09:00 1.00 DRILL N DPRB PROD1 RIH, tagged btm at 12865', corrected depth, with TF aligned as
drilled at .53/.35bpm, 1575psi, Dn Wt 13.7k, slight bobbles of
2-3k down at 11250' and 11385', started pumping
form-a-squeeze pill down hole at 11700', increase pump rate to
.80/.62bpm, 1850psi, ECD 9.75ppg
09:00 - 10:20 1.33 DRILL N DPRB PROD1 POH to 9250', Up wt 31.7k, .86/.56bpm, 1750psi, ECD
9.49ppg, 10k overpull at at 11250', lay-in 23 bbls of
form-a-squeeze pill followed by 35bbls of Flo-Vis pill at .80bpm,
2380 si,
10:20 - 11:55 1.58 DRILL N DPRB PROD1 Shut in well, squeeze form-a-set pill into formation maintaining
100psi, bumping up pressure in 100psi increments to 500psi~
erform s ueeze with um #1
Time Bbls Pumped Squeeze Pressure
Pressure Dropped
1050 2.0 200
100
1100 .7 300
200
1110 2.0 400
300
1125 2.0 500
400
1150 open well
Pump #1 rheostat is uncontrollable when bring pump #1 online
while both pumps switches are online, problem seems to be
with pump switch on console in ops cab, switch #2 pump to
lock out position on console, Mike Schick, Nordic #2
electrician, called out to troubleshoot
11:55 - 13:30 1.58 DRILL N PROD1 RIH, wash down to 12700', 1.33/1.31 bpm, 3525psi, started
pumping liner pill at 11500'
13:30 - 16:30 3.00 DRILL P PROD1 POH to BHA #11, I~r-in,30bb1 liner pill with 3ppb alpine beads,_
.90/.52bpm, 2350psi, Up wt 31.5k, monitor well above window
at 9250', hole stable
16:30 - 17:15 0.75 DRILL P PROD1 POH, LD BHA #11, bit grade 1-1- I, balled up, installed a-line
boot
Lost total of 300 bbls since loses begin
17:15 - 18:00 0.75 DRILL P PROD1 MU, RIH with swizzle stick across wellhead and stack, flush out
stack and surface lines
18:00 - 20:30 2.50 P RUNPRD CTD storage mitigation:
Pump 50 bbls fresh water, pump 10 bbls of inhibited water 9
Printed: 1/14/2008 8:58:28 AM
1 ~
BP EXPLORATION
Operations Summary Report
Legal Well Name: 15-04
Page 14 of 26
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours I
_~ Task
--- - Code
--
12/25/2007 18:00 - 20:30 2.50 P
20:30 - 21:30 1.00 P
21:30 - 23:00 1.50 P
23:00 - 00:00 1.00 P
12(26!2007 00:00 - 01:00
01:00 - 01:20
01:20 - 02:00
02:00 - 02:55
02:55 - 03:15
03:15 - 05:15
1.00 RIGU P
0.33 RIGU P
0.67 RIGU P
0.92 RIGU N
0.33 CASE P
2.00 CASE P
05:15 - 05:40 0.42 CASE P
05:40 - 08:00 2.33 CASE P
08:00 - 08:15 0.25 CASE P
08:15 - 10:30 2.25 CASE P
10:30 - 11:30 ( 1.001 CASE ~ P
11:30 - 12:00 0.50 CASE C
12:00 - 12:30 0.50 CASE C
12:30 - 15:15 2.75 CASE C
15:15 - 15:30 0.25 CASE C
15:30 - 15:45 0.25 CASE C
15:45 - 16:45 1.00 CASE C
16:45 - 18:00 1.25 CASE C
18:00 - 19:30 1.50 CASE C
19:30 - 21:10 1.67 CASE C
21:10 - 22:20 ~ 1.17 ~ CAS E i C
NPT Phase Description of Operations
RUNPRD (mixed in pill pit 10 bbls of fresh water with 10 gallons of
corrosion inhibitor, M-I producti KI-3882), pump 10 bbb{s of
methanol water, blow down reel with N2 C~? 1500scfm intial rate
of 2bbl/min liquid out -8-10minutes. All returns to tiger tank
RUNPRD Unstab injector, open well, fill well with 7.5 bbl -862' or 385 psi
hydrostatic pressure loss
RUNPRD Secure coil end onto reel, lower reel, position reel onto semi
trailer
RUNPRD Bring in E-free coil, crane up to reel house, secure and plumb
into reel manifold
RUNPRD ~ Continue to plumb in Efree coil into reel house manifold
RUNPRD Install internal grapple into Efree coil end, pull test, pull across
pipeshed, stab into injector
RUNPRD Ri u to run liner
WAIT RUNPRD Wait. Changed plans for welding on coil connector and
pumping coil volume from before picking up liner until after
picking up liner. Baker arrived within 2 hour notice.
RUNPRD MU Shoe track
RUNPRD PU 2-3/8" liner- drift first 5 connections, continue to PU 60 jts of
2-3/8" 4.7# L-80 STL liner with cemtralizers, MU torque
1100-1200ft-Ibs
RUNPRD Fill pipe
RUNPRD Continue picking up 2-3/8" liner, RIH with 101 jts and shoe
track
RUNPRD PJSM on RU head pin and 1" line while welding on SLB CTC
RUNPRD RU circ head and 1" line, brk circ, stage pumps up to 3.7/2.5
bpm, 2022psi, monitor loses at 60 bph, Discussed with Anch
office to POH and prep to run Baker IBP
Welded on SLB CTC, pull test 30k
RUNPRD RU ball catcher sub, circ 5 bbls, test CTC and surface lines to
inner reel valve, install and pump volume dart, calculated vol
40.5bbls on 14625' of 2" CT, actual vol was 41.2bbls, RD ball
catcher sub, retrieved dart.
RUNPRD RU Circ head, mix 9.6ppg KCL slug
RUNPRD Pump dryjob, RD circ head
RUNPRD POH dry, rack back 50 stds of 2 3/8" liner, LD 1 jt of 2 3/8" liner
and 2 3/8" shoe track with 1 jt of 2 3/8" liner, hole static
RUNPRD PJSM on handling and MU of IBP Assy
RUNPRD RU rig floor to run IBP Assy
RUNPRD PU, MU IBP assy #13 w/ 2 3/8" index guide shoe, 3 joints of 2
3/8" 4.7# L-80 STL with cementralizers, Baker 2 1/8" IBP, Hyd
R(r, Screen Sub, inflstion Valve, MHA, SLB Weldon CTC, OAL
117.53', stab inj
RUNPRD RIH with IBP Assy #13, .15/.36bpm, 645psi at 75fpm -4000'
RUNPRD RIH to window with IBP, .15/.36 bpm, 700 psi at 75 fpm
RUNPRD RIH to open hole with IBP, .15/.30 bpm 850 psi at 68 fpm,
small bobbles at 10,400 MD, 11,229 MD, 11,342MD
""hole in good condition""'
RUNPRD Ta bottom at 12,876', Flag Pipe, Pump 10 bbls 2% KCL from
pill pit, shut down pump, Drop ball, zero In Total, Pump 5 bbls
Printed: 1/14/2008 8:58:28 AM
~'
BP EXPLORATION Page 15 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To Hours I Task. C
-- - -_ I _-- --
12/26/2007 21:10 - 22:20 1.171 CASE C
22:20 - 22:50 I 0.501 CASE I C
22:50 - 23:10 I 0.331 CASE I C
23:10 - 00:00 ~ 0.83 ~ CASE ~ C
12/27/2007 00:00 - 01:00 1.00 LCR C
01:00 - 01:50 0.83 LCR C
01:50 - 02:30 0.67 CASE C
02:30 - 03:30 1.00 CASE C
03:30 - 05:30 2.00 CASE C
05:30 - 06:15 0.75 CASE C
06:15 - 07:45 1.50 ~ CASE ~ P
07:45 - 09:00 1.25 CASE P
09:00 - 09:50 0.83 CASE P
Spud Date: 3/24/1982
Start: 12/10/2007 End: 1/4/2008
Rig Release: 1/4/2008
Rig Number: N1
NPT Phase Description of Operations
RUNPRD 2% KCL, pump switch to pits for flo-pro Q 1.7 in/1.2 out, slow
rate at 29 bbls, .sin/.40out, 1150 psi, aluminum ball seats at
42 bbls/release (coil volume 41.2)
RUNPRD Kill pumps, wait for downhole temperatures to stabilize /
inflating packer.
RUNPRD Circulate, test for overpulls, 0.5 in/.5 out, no overpulls/ must be
released from IBP
RUNPRD POOH 35 fpm, 1.45 in/1.3 out, PVT = 215, IA=56 psi, OA=10
psi
RUNPRD POOH with IBP setting assy. 1915 psi, 1.46in/1.Oout, IA=60,
OA=17, 120 fpm, PVT at 6815 MD = 194 bbl
RUNPRD LD IBP running BHA
RUNPRD PU Shoe Track, PJSM for tripping stands
RUNPRD RIH picking up stands of 2-3/8" 4.7# L-80 STL liner with
cemtralizers, ***drifting all stands*** PVT=169, IA=57,OA=20,
-3.0 min/std
RUNPRD RIH picking up stands, ran 112 jts total of 2-3/8" 4.7# L-80 STL
liner with cemtralizers,
RUNPRD MU CTLRT tools, space out subs, CTC, Stab Injector, OAL
3716.44
RUNPRD RIH with Liner Assy #14 to 9800', Up wt 29.2k, Dn wt 16.2k,
.22/.51 bpm, 465psi, PVT 180 -208bb1s
RUNPRD RIH with Liner Assv #14. taoaed IBP at 12765'. corrected to
12756', tagged several times, Dn wt 16.4k - 9k, Up wt 46k,
.22/.39bpm, 1160 - 1400psi, PVT 208 - 221 bbls, several
bobbles of 3-5k at 11265, 11318, 11510, 11830, Dn drag of 15k
at 12215, 12227, 12318
RUNPRD Stack 10K on liner, Launch ball 5/8 steel with 900psi, Circulate
at 1.17/1.35bpm, 2400psi, slowed rate to .35/.49bpm, 1400psi
at 30 bbls pumped, ball on seat with 35.4bb1, seat sheared with
4000psi, Release from liner, PU Wt 25k, Confirm release
Suck down pits in preparation to swapping well to 2% KCL
double slick
09:50 - 13:15 3.42 CASE P RUNPRD Swap well to 2% KCL double slick, 1.4/1.Obpm 3050psi, slowed
rate to 1.01/1.05bpm, 2050psi, after pumping 60bbls of KCL
water at 1.01/.75bpm, 1800psi, loss rate at 25percent, KCL
returns to surface after pumping 130bb1s, 1.01/.88bpm,
1655psi, loss rate decreased to 12percent, increased rate to
1.52/1.07bpm, 2295psi, 30percent loss rate, total KCL water
pumped 250bb1s
SAFETY MEETING covering HSE hazards with mitigations and
procedure of cement job, SLB cementers set up to pump
additional 30 percent excess of cement due to 30 percent loses
downhole
13:15 - 13:45 0.50 CEMT P RUNPRD Batch mix 20.5 bbl of 15.8 class "G" with additives
Ciculating KCL, in rate 1.53, out rate 1.08, 30% losses
13:45 - 15:30 1.75 CEMT P RUNPRD Pump cement job as followed with SLB, pump 5 bbl fresh
water, bypassed micromotion, closed inner reel valve, PT
cement lines to 6500psi, ok, line back up thru micromotion
PUrr1D 14.5 bbl class G cement with latex additives at 1.5/1.0
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: 15-04
Page 16 of 26
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
12/27/2007 13:45 - 15:30 1.75 CEMT P
RUNPRD bpm, 3665 psi.
(increased cement by 4.5 bbl due to 30% losses while
circulating KCL)
Purge cement line with Biozan, Install and launch wiper dart
with 600 psi, displace with Biozan
5 bbl, 1.0/.82 bpm, 2250 psi
10 bbl, 1.5/.90 bpm, 2600 psi
15 bbl, 1.5/.90 bpm, 1600 psi
20 bbl, 1.5/.90 bpm, 1600 psi
25 bbl, 1.5/.90 bpm, 1700 psi
30 bbl, 1.5/.90 bpm, 1850 psi
35 bbl, 1.5/.90 bpm, 2000 psi
40 bbl, 1.0/.80 bpm, 1600 psi
Dart landed on LW P at 41.5 bbl, Sheared at 3700 psi
45 bbl, 1.0/.80 bpm, 2650 psi
48 bbl, 1.0/.80 bpm, 4450 psi
Slow rate to .75/0.0 bpm at 4'
pressure drop off to 2900psi, micromotion showed 4.5bb1
cement on out rate, estimated top of cement at 11378'
50 bbl displ, 0.75/0.0 bpm, 3200 psi
55 bbl displ, 0.75/0.0 bpm, 3417 psi
Bumped plug at 55.5 bbl [55.0 bbl calc] with 4500 psi, pressure
bleeding off slowly, released pressure, Bled pressure to 0 psi,
check floats, Floats holding
CIP at 15:20 am 12/27/07
15:30 - 17:00 I 1.501 CEMT I P
17:00 - 17:30 0.50 ~ CEMT ~ P
17:30 - 17:45 0.25 CEMT P
17:45 - 18:15 0.50 CEMT P
18:15 - 22:45 4.50 CEMT P
22:45 - 23:45 1.00 CEMT P
23:45 - 00:00 0.25 CEMT P
12/28/2007 00:00 - 00:30 0.50 CEMT P
00:30 - 02:20 1.83 CEMT P
02:20 - 03:00 I 0.671 CEMT I P
03:00 - 03:05 0.08 CEMT P
03:05 - 04:30 1.42 CEMT P
04:30 - 05:30 1.00 CEMT P
05:30 - 08:00 I 2.501 CEMT I P
17', index Shoe 12756', IBP
12756', TD 12865'
RUNPRD Pressure up to 500 psi, unsting running tool. circ 1 bbl at 0.5
bpm, POOH to 12610'CTD, paint EOP flag at 9000', POH
replacing voidage, .60/.18bpm, 315psi, Std back injector
RUNPRD POH, LD Baker CTLRT, cleared floor of Baker tools, offload
down beaver slide
RUNPRD PJSM RU handling tools and PU 1" CS Hydril
RUNPRD RU handling tools for 1" CS Hydril
RUNPRD RIH with CS Hydrill
RUNPRD Wait on cement compressive strength to reach 500 psi,
circulate.l bpm, 139 psi, while RIH at 15 fpm, PVT=282,
IA=59, OA=18, confirm UCA of 500 psi 9hr:22min from start
time
RUNPRD RIH, 95 fpm, .11 bpm
RUNPRD RIH, 223psi, 0.13in/0.44out, IA=56, OA=16, 97 fpm
RUNPRD Run into liner, 3073 psi, .84in/ .96out, 3100 psi, IA=61 psi,
OA=18, PVT=291, liner clean
""PBTD = 12,727"""'
RUNPRD POOH, 120 fpm, 1802 psi, .7in/.55 out, IA=62, OA=18,
PVT=290
RUNPRD Flow test at top of liner .5 in/.5out
RUNPRD POOH with coil tubing injector, Dropped ball opened circ sub
RUNPRD POOH with CS Hydril stands in derrick, PVT=281, IA=62,
OA=26
RUNPRD Cont POOH with CS Hydril stands in derrick, total of 59 stds,
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 17 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase I Description of Operations
12/28/2007 05:30 - 08:00 2.50 CEMT P RUNPRD LD mill and mtr.
08:00 - 09:00 1.00 EVAL P LOWERI PU logging tools to rig floor, PJSM on handling radiation source
09:00 - 11:45 2.75 EVAL P
11:45 - 12:55 1.17 EVAL P
12:55 - 15:00 2.08 EVAL P
15:00 - 16:15 1.25 EVAL P
16:15 - 17:15 1.00 EVAL P
17:15 - 20:15 3.00 EVAL P
20:15 - 21:00 0.75 EVAL P
21:00 - 21:30 0.50 EVAL P
21:30 - 21:45 I 0.251 EVAL I P
21:45 - 23:00 ~ 1.25 ~ EVAL ~ C
23:00 - 00:00 1.00 EVAL C
12/29/2007 00:00 - 00:45 0.75 EVAL C
00:45 - 01:15 0.50 EVAL C
01:15 - 04:00 2.75 EVAL C
04:00 - 06:00 2.00 EVAL C
06:00 - 08:00 2.00 i EVAL ~ C
08:00 - 08:45 0.75 EVAL C
08:45 - 09:40 0.92 EVAL C
LOWERI MU Logging BHA #16 with SLB MCNL, 58 stds of 1"CSH,
MHA, CTC, stab injector, OAL 3676'
LOWERI RIH with MCNL logging BHA #16 to 8950', pvt 275bb1s,
.50/.80bpm, 600 psi
LOWERI Logged Down from 8950' to 12717', 30fpm, .50/.60bpm,
828psi, paint EOP Flag at 8990' at 12666' CTD
LOWERI Logged Up from 12692' - 8950', 60fpm, .50/.34bpm, 1000psi
LOWERI POH to BHA #16, LD MHA, Std Bk Injector
LOWERI POH with BHA # 16, Std Bk 1" CSH, LD 1 jt of 1" CSH to
change connection breaks
LOWERi PJSM for Laying down MCNL, lay down MCNL
LOWERI PJSM for Pressure Test Liner Lap:
Time 0: 3/4 bpm - 2000 psi - 3-4 min bleeding slowly
from 1000 psi -not pumping
25 min 750 psi -not pumping
30 min 650 psi -not pumping - Fail
LOWERI In'ectivit : s
1 bpm 1700 psi peak stabilized at 1440 psi
1.5 bpm 1700 psi peak stabilized at 1540 psi
2.0 bpm 1720 psi initially then steady climb
1800-1900-2000-2200 at 13 bbl total pumped
LOWERi PJSM, Cut 100' of coil, PJSM, Weld on new coil connector -let
weld cool
LOWERI Pull test coil connector
LOWERI Assemble SLB SCMT logging tool on Catwalk, Test on Catwalk
LOWERI PJSM for picking up BHA, PU SCMT
LOWERi RIH with CS Hydrill, PVT =233, IA=52, OA=O
LOWERI RIH with Coil PVT=241, IA=52, OA=O , Cir= 1143 , .57in/.9out,
95 fpm
LOW ER1 Log up with SCMT-GR-CCL-Temp from 12692' to 9000' with
out pumps, 30fpm
LOWERI RIH to PBTD at 12692', EOP flag at 8890'
LOWERI Shut in well, bullhead 20 bbls as follows
BBLS BPM PSI
5 .50 1655
10 .50 1685
15 .50 1685
21 .50 1600
09:40 - 10:10 0.50 EVAL C
10:10 - 12:30 2.33 EVAL C
12:30 - 13:45 1.25 EVAL C
13:45 - 16:30 2.75 EVAL C
16:30 - 17:00 0.50 EVAL C
Bleed off pressure thru choke
LOWERI Monitor well for 30 mins before log up with SCMT
LOWERI Log up with SCMT-GR-CCL-Temp from 12692' to 9000' with
out pumps, 30fpm
LOWERi POH to SCMT Log BHA # 17, .66/.27bpm, 1534psi at 101fpm,
Brk out and std back injector
LOWERI POH, LD MHA, 1 Jt of 1" CSH, Std Bk 60 Stds of 1"CSH, LD
SCMT BHA # 17
LOWERI PJSM on servicing rig, Service rig, adjust drawwork Brakes
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 18 of 26
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name: 1
ell Name: 1
e:
Name:
From - To 5-04
5-04
REENTE
NORDIC
NORDIC
Hours
R+COM
CALIST
1
Task
PLET
A
Code
E
NPT
Start
Rig
Rig
Phase
Spud Date: 3/24/1982
: 12/10/2007 End: 1/4/2008
Release: 1/4/2008
Number: N1
Description of Operations
12/29/2007 17:00 - 21:00 4.00 REMCM C RUNPRD PJSM on handling and RIH with BHA, MU CIBP BHA # 18, RIH
w/ 61 stds (122 Jts) of 1 "CSH, PVT = 178, IA=52, OA=O
21:00 - 23:10 2.17 REMCM C RUNPRD RIH with Coil PVT=184, IA=52, OA=O ,Cir= 143 , .2in/.5out, 95
fpm, Tag 12703' add 10', 12713' MD (PBTD)
23:10 - 00:00 0.83 REMCM C RUNPRD Drop 1/2" aluminum ball to release CIBP, 3800psi, .95/.90 out,
PVT=240.
12/30/2007 00:00 - 00:30 0.50 REMCM C RUNPRD Circulating ball to seat, reduce rate to .5 bpm at 35 bbls, Cir
Pressure = 1150 psi, CIBP released at 40.9 bbl, pressure
increased to 2000 psi, .48 in/.52out
00:30 - 01:00 0.50 REMCM C RUNPRD Start pumping pill, begin POOH 4 fpm waiting for the 15 bbls of
12#/bbl Naar viscosified (w/2ppb biozan) pill to exit nozzle
01:00 - 02:30 1.50 REMCM C RUNPRD POOH laying in Naar pill, pill falling, no circulating pressure, .4
in/.2 out, IA=56, OA=O, 50fpm, laying in last bbl of pill just
above TOL
02:30 - 03:00 0.50 REMCM C RUNPRD BHA above TOL, shut inner reel valve, shut in choke, perform
in'ectivi test:
Pumped away 15 bbls total, .5bpm/1300 psi, 1/1690, 1.5/1750,
2.0/1970, 2.5/2400 and climbing, shutdown, bleed pressure
03:00 - 03:40 0.67 REMCM C RUNPRD POOH with Coil, well still taking proper fluids
""no static losses""'
03:40 - 04:00 0.33 REMCM C RUNPRD Stand back injector
04:00 - 07:00 3.00 REMCM C RUNPRD POOH w/ CS Hydril, PVT = 183 w/ 61 stds in hole, IA=56,
OA=2
07:00 - 07:30 0.50 BOPSU C RUNPRD PJSM on BOP function test, performed weekly BOP function
07:30 - 08:00 0.50 REMCM C RUNPRD PJSM handling cementing BHA#19, MU cementing nozzle, 5' 1
1/4" CSH pupjt, X-O, Hydraulic Disconnect, SLB Weldon CTC,
Stab injector, OAL - 8.9'
08:00 - 09:45 1.75 REMCM C RUNPRD IH with Cementin nozzle ass #19 to 9120', .70/.101 bbls,
344psi, 82fph
09:45 - 10:45 1.00 REMCM X WAIT RUNPRD Circulating at .42/.42bpm, 200psi, increased rate to 1.0/1.Obpm
at 600psi ,Waiting on SLB equipment to load out cement liner
squeeze job, cement equipment on other jobs,
10:45 - 11:30 0.75 REMCM X WAIT RUNPRD Shut in well, bullhead 20 bbls as follows with pump #2, PVT
210bb1s
BBLS BPM PSI
0 - 5 .50 1187 - 1285
5 - 10 1.01 1450 - 1450
10 - 15 1.50 1520 - 1600
15-25 2.01 1600-1912
ISIP 1912 - 1014
Minutes
1 927
2 747
3 619
4 531
5 458
10 250
Bleed off pressure thru choke
11:30 - 14:30 3.00 REMCM X WAIT RUNPRD Circulating at .68/.65bpm, 315psi, Waiting on SLB equipment
to load out cement liner squeeze job
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 19 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task ~ Code NPT Phase Description of Operations
12/30/2007 14:30 - 15:30 1.00 REMCM X WAIT RUNPRD Little Red Services arrived on location, PJSM on RU, RU
surface line to std pipe manifold
15:30 - 16:30 1.00 REMCM X WAIT RUNPRD PJSM on handling and installing access platform, Installing
BOP access platform, Little Red rolling displacement tank,
heating diesel to 120 degrees
16:30 - 17:00 0.50 REMCM X WAIT RUNPRD Circulating at .43/..41 bpm, 157psi, Waiting on SLB equipment
to load out cement liner squeeze job, continue rolling and
heating diesel to 120 degrees
17:00 - 18:00 1.00 REMCM X WAIT RUNPRD PJSM for CT x Tubing annulus. Discussed corrdinated
operations between Little Red and Rig,
Little Red brk circ, PT to 4000 psi. Shut-in well. Bullhead
45bbls of 120 de ree diesel down CT X tubing annulus,
bullhead CT at .35bpm to pervent freezing. u ea iesel as
Bbls BPM Bullhead PSI Temp IA
OA
0 - 5 1.3 1747 120 57
0
5 - 10 1.3 1835 120 57
0
10 - 15 1.3 1923 120 56
0
15 - 20 1.3 1989 130 57
0
20 - 25 1.3 2062 120 59
2
25 - 30 1.3 2142 120 59
2
30 - 35 1.0 2117 120 60
4
35 - 40 1.0 2175 120 61
5
40 - 44 1.0 2249 120 61
5
Shut Down Little Red, Shut in backside choke, bled down Little
Red to zero,
Monitor Annulus Pressure while wait on cemeters, pumping at
minimum rate down CT at .20bpm, 1033psi
Minutes Shut In PSI Minutes Shut In PSI
5 1556 50 1575
10 1556 60 1575
15 1560 60 shut down pumps psi fell to
1165psi on annulus
20 1564
30 1567
40 1567
Move fluid down coil every 15 minutes
18:00 - 21:00 3.00 REMCM X RUNPRD Continue holding pressure on backside. Pump 1 bbl of KCL
down coil every 15 minutes w/ well shut in
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 20 of 26 ~
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To Hours Task Code NPT
12/30/2007 18:00 - 21:00 3.00 REMCM X
21:00 - 21:10 I 0.171 REM
21:10 - 23:00 I 1.831 REM
Spud Date: 3/24/1982
Start: 12/10/2007 End: 1 /4/2008
Rig Release: 1/4/2008
Rig Number: N1
Phase Description of Operations
RUNPRD
Time Coil Bullhead PSI
19:15 857 1150
19:25 900 1250
19:35 1000 1534
19:50 612 1240
20:05 800 1011
20:30 850 1220
20:45 900 1300
RUNPRD PJSM for bullheading 1 coil volume through coil of 150 degree
diesel. Plan is to initially pump at a rate not to exceed 2000 psi
shut in well head pressure until diesel moving down the coil,
then to gradually cut back rate to get to close to 1500 psi
SIWHP when diesel is leaving nozzle.
RUNPRD Pump 43 bbl 150 degree diesel
Time Rate Cir SI Press Tot Vol
21:17 .6 1337 0
21:19 .4 1729 .5
21:22 .5 1800 .5
21:21 .5 1882 1.3
21:23 .5 1886 2.2
21:25 .6 1919 4.0
21:27 .6 1923 4.7
21:31 .65 1963 7.5
21:51 .63 1945 16.9 diesel over
gooseneck moving into hole
Target 1700 psi circulating pressure 1500 psi over + 200 psi
losses through coil
IA=57, OA=6
Circulate at minimum rate that Hot Oil can keep temperature at
150 F
Time Rate Cir Press SI Pressure Tot Vol
22:00 .5 1677 1875 24
22:05 .48 1707 1868 25
22:17 .35 1670 1743 31
22:20 .3 1725 1750 33
22:30 .2 1611 1633 35
22:40 .23 1700 1663 37
22:50 .2 1790 1655 41
23:00 .2 1750 1622 42
Shut down Hot Oil -shut inner reel valve
23:00 - 23:50 0.83 REMCM X RUNPRD Wait on SLB cement, wait for pressures to stabilize. Coil and
annulus all 150 degree 6.7#/gal diesel. Pressures stabilize at
180 psi coil/ 77 psi shut-in pressure
23:50 - 00:00 0.17 REMCM C RUNPRD SLB arrives on location, pre-job planning with SLB cementing,
Nordic, Little Red and SLB coil.
12/31/2007 00:00 - 00:30 0.50 REMCM C RUNPRD Prejob planning meeting with SLB cementing/Hot Oil
00:30 - 01:30 1.00 REMCM C RUNPRD PJSM
01:30 - 01:40 0.17 REMCM C RUNPRD Continue rigging up SLB cementers
01:40 - 01:50 0.17 REMCM C RUNPRD Pump 5 bbls H2O
Printed: 1/14/2008 8:58:28 AM
~ ~
BP EXPLORATION Page 21 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
12/31/2007 101:40 - 01:50 I 0.171 REM
01:50 - 02:00 I 0.17
02:00 - 02:15 I 0.25
02:15 - 03:00 I 0.75 I R
03:00 - 03:35 I 0.58
RUNPRD Well shut in, driller on manual choke monitoring pressures not
to exceed 1700 psi.
Time Rate Volume Cir Press SI Pressure
01:26 .75 915 560
01:28 .53 .5 1315 1047
01:33 .22 2.2 1750 1575
Finsih pumping 5 bbls H2O
Realize we can't inject fast enough with well shut in so we will
take diesel returns to the TT while pumping cement down the
coil almost to the nozzle, so we will pump cement at higher
rate.
RUNPRD Pressure test cement lines, zero MM-in (when cement starts
into coil), Pump cement 21 bbls total (17 bbls volume in reel
before gooseneck), open choke, take returns to Tiger Tank. 1:1
returns
2 in in/ 1.95 out, Cir Press = 2770 psi, choke wide open,
nozzle at 9120' MD.
18 bbls away, cement over goosneck, start to shut in choke to
hole in/out rate the same.
Zero MM-out when 20-21 bbls of cement away. Cir pressure
2040, shut in pressure 22.
RUNPRD Pump 5 bbls H2O, Shut down cement, close choke. Pressure
building on WHP stable at 1390 psi. MM-Out total 6.1 (this
MM-Out Total number suspect because we had return
densities of 4#/gal with very high rates showing). Bring on
Little Red 1 bpm. At 42 bbl MM-in will have cement at the
nozzle, keep choke at 1250 psi. Cement not running away
from us 1.5 in/1.24 out, WHP= 1000 psi, Cir Press 1326 psi.
Release cementers
RUNPRD At 38 bbls (MM-in)slow Little Red to .5 bpm, adjust choke to
maintain 1670 psi max on WHP. Out rate goes to zero. .63
bpm in/0.0 bpm out.
42.8 bbls 2 barrels out of nozzle
Shut in pressure holding 1400 psi at fully closed
bbls in /out in prs whp
44 1.3/0 400 psi 1344 psi
46 1.3/0 390 psi 1282 psi 5 bbls away
48 1/0 919 psi 1400 psi
50 1/.3 900 psi 1578 psi intermittent
returns at 1500 psi 1.6 bbl total
54 .7/0 1400 psi 1633 psi
56 .65/0 1552 psi 1600 psi
58 .63/0 1630 psi 1501 psi
60 .53/0 1860 psi 1509 psi
62 .5/0 1981 psi 1542 psi
"'""at 62 bbls all cement out the nozzle""**
cir .5 bbl min, POOH 60 fpm, replacing coil voidage
Str wt 22571#, Cir pressure 2300 psi,1600 WHP, total out
returns, Drop SIWHP 500 psi.
RUNPRD PUH to safety 0 in /0 out, Park nozzle at 8200 MD, Open
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 22 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To Hours Task Code NPT
_;_ _ ---
12/31/2007 03:00 - 03:35 0.58 REMCM C
03:35 - 03:45 I 0.171 REMC
03:45 - 04:15 I 0.501 REMC
04:15 - 11:00 I 6.751 REMC
11:00 - 11:10 I 0.171 REMC
Spud Date: 3/24/1982
Start: 12/10/2007 End: 1 /4/2008
Rig Release: 1/4/2008
Rig Number: N1
Phase Description of Operations
RUNPRD baker choke on coil, bleed off coil. Close baker choke, build
pressure on coil -543 psi, may have cement above. Decide to
pull up another 1000' replacing coil voidage .5 bpm/57fpm.
Little Red out of diesel but we have an entire coil volume full of
diesel (16 bbls before diesel would leave the reel house) so we
will displace partial volume of the reel with 2% KCL
RUNPRD Park at 7400' MD. Flow check /pressure check well.
0 in/ Oout, 0 WHP, 500 psi Coil Pressure. Still shows that
cement may be above us even though we are pulling normal.
POOH another 500' replacing coil voidage 57 fpm / .54 bpm.
Pressure building both sides, don't want to squeeze away
cement but want to replace coil voidage without flowing the
well. Open choke to drop WHP 1100 down to 0.
RUNPRD Park at 6800' MD, well fully shut in, 0 in/0 out, 300 psi on coil 0
psi, WHP = 0. Decide we probably have dissimilar fluids on
backside, not cement. Pressure slowly bleeding down on Coil
to 150. Pull coil 10' every 30 minutes. Begin wait for UCA.
IA= 59, OA=5
RUNPRD Wait on UCA of 500 psi:
04:25 Coil Pressure = 143 psi, Oin/Gout
06:30 Coil Pressure = 43 psi, Oin/Gout
08:30 Moved Fluid in CT at .2bpm, .5bbls, CT at 197psi,
SD pressure dropped to 103psi,
CT = 103 psi, WH 11 psi, SI 15psi
10:00 CT = 4 psi, WH 11 psi, SI Opsi
11:00 CT = 4 psi, WH 11 psi, SI Opsi, Compressive
Strength at 1000psi
RUNPRD Pressure up against cement/liner lap at .46bpm, .4bbls, 500psi,
Monitor for 10 minutes, ,bled off pressure, open well, static
Minutes Circ Psi Pump Psi SI Psi
ISIP 575 513 510
1 570 513 470
2 564 502 458
3 564 504 454
4 560 498 450
10 549 487 439
11:10 - 13:00 I 1.831 REMC
13:00 - 14:15 I 1.251 REMC
14:15 - 14:30 0.25
14:30 - 15:00 0.50
15:00 - 15:45 0.75
15:45 - 16:00 0.25
RUNPRD RIH from 6750 - 8812', Dn wt 8.8k, Up wt 22k, Circ at
2.0/2.3bpm, 3100 psi, displace diesel from well with 25 bbls of
Biozan sweep, followed with 2 percent double slick KCL, taking
weight at 7570', wash down thru diesel contaminated cement
from 7570 to 8812' with do drag of 2 -8k, pumped three 25 bbl
Biozan sweep around, stacking wt at 8812', unable to work
past, cement contaminated returns strung out over 80bbls
weighting from 8.7 to 9.5ppg
RUNPRD POH to cementing BHA # 19, 2.71/2.23bpm, 1813psi, 125fpm,
washing out nipples and GLM's
RUNPRD POH LD Cmtg BHA #19
RUNPRD Blow back CT with air, RU Hydraulic cutter, Cut 100' of 2" CT,
RD Hyd cutter
RUNPRD Weld-on SLB CTC, pull test to 35k, pressure Tested to 3500psi
RUNPRD MU cleanout BHA #20 with 2 1/8" mtr and 2.80" mill, MHA, SLB
Weldon CTC, stab Injector
Printed: 1/14/2008 8:58:28 AM
'
BP EXPLORATION Page 23 of 26
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
12/31 /2007 16:00 - 17:25
17:25 - 18:00
18:00 - 19:25
19:25 - 20:25
20:25 - 23:00
23:00 - 00:00
1 /1 /2008 100:00 - 01:00
01:00 - 02:00
02:00 - 04:00
04:00 - 05:30
05:30 - 08:15
08:15 - 09:15
09:15 - 11:15
11:15 - 13:45
13:45 - 15:10
15:10 - 16:00
16:00 - 17:00
17:00 - 19:00
15-04
15-04
REENTE
NORDIC
NORDIC
Hours ',
R+COM
CALIST
1
Task
- _
PLET
A
Code
_
E
NPT
Start
Rig
Rig
Phase
_ -
Spud Date: 3/24/1982
: 12/10/2007 End: 1/4/2008
Release: 1/4/2008
Number: N1
Description of Operations
---
1.42 REMCM C RUNPRD RIH with cleanout BHA #20 to 7500'
0.58 REMCM C RUNPRD RIH washing do with some motor work (100 -300 differential)
from 7500' - 8790'MD , Up wt 23.3k, Dn wt 10.8k,
1.59/1.67bpm, 1275psi, WOB 1 - 2k, PVT 242bb1s, steady
streams of cmt cuttings crossing shaker, cement in returns at
8.5 - 9.01 ppg
1.42 REMCM C RUNPRD Milling mostly firm cement 8790'MD-8857'MD - 50fph, 1300
free spin, 1650 drilling, IA=70, OA=90
1.00 REMCM C RUNPRD Milling cement from 8857' -8915' MD 70 fph with steady motor
motor work (1260-1450 psi), PVT = 251, IA=70, OA=67
2.58 REMCM C RUNPRD Milling cement 8915' MD - 8955' MD - 20 -80 fph, intermittent
hard stringers followed by soft drilling. 1300 psi free spin,
1650 psi drilling, 1.4in/1.4out, bit appears to cutting
1.00 REMCM C RUNPRD Milling cement 8955' MD - 8976'MD IA=70, OA= 134, 30-40
fph
1.00 REMCM C RUNPRD Milling cement 8976' - 8988' MD, Very firm cement, Still
300-400 psi motor work, PVT=286, IA=70, OA=133, 1.5 in,
1.4 out, density 8.4 in/9.4 out, keeping 1- 5 bbl hi-vis pill in the
hole all the time. Hi-vis sweeps bringing larger chunks of
cement to the surface
1.00 REMCM C RUNPRD Milling cement 8988' 9010' MD picking up to 80 fph last 10',
PVT=283, IA=70, OA=133, 1.6in/1.55 out
2.00 REMCM C RUNPRD Milling cement 9010'- 9063'MD, ROP=15-80 fph ,PVT=284,
IA=68, OA=126, 1.6 in/1.55 out keeping 1- 5 bbl hi-vis pill in
the hole all the time. Hi-vis sweeps bringing larger chunks of
cement to the surface, charge pump struggles to pump Hi-vis
sweeps, sometimes sucking air.
1.50 REMCM C RUNPRD Milling cement 9063'-9075MD ROP=12 ,PVT=275, IA=65,
OA= 118, 1.6in/1.5 out, density 8.4/ 9.1, 1650 free spin, 1900
milling. Very slow milling but still getting 200-400 psi motor
work.
2.75 REMCM C RUNPRD Milling hard cement 9075' - 9085', ROP 22fph, PVT=275,
IA=60, OA= 120, 1.618/1.67 out, density 8.4ppg in/out, 1650
free spin, 2021 psi, 200-400 psi motor work, stacking and
stalling periodically.
1.00 REMCM C RUNPRD Milling hard cement 9085' - 9089', ROP 3 - 5fph, PVT=275,
IA=60, OA= 120, 1.618/1.67 out, density 8.4ppg in/out, 1650
free spin, 2021 psi, 200-400 psi motor work, stacking and
stalling periodically.
2.00 REMCM C RUNPRD Milling hard cement 9089' - 9094', ROP 3-5fph, IA=60, OA=
120, 1.61811.,67 out, density 8.4ppg in/out, 1700 free spin,
2021 psi, 200-400 psi motor work, stacking and stalling
periodically, swapped well to new KCL double slick with
.6percent safe tube
2.50 REMCM C RUNPRD Milling hard cement 9094' - 9096', ROP 3-5fph, IA= 55psi, OA=
85psi, 1.61/1.53 out, density 8.39ppg in/8.42ppgout, 2100 free
spin, 2400psi, 200-400 psi motor work, stalling periodically,
swapped well to new KCL double slick with .6percent safe tube
1.42 REMCM C RUNPRD POH to surface. Tag up 175 early.
0.83 REMCM C RUNPRD POP of well check pipe for ovality .025. Stab onto well. Open
side door stripper. OK. POH .to surface.
1.00 REMCM C RUNPRD LD BHA and install drip pan. PU BHA new mill and motor
2.00 REMCM C RUNPRD RIH.
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 24 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To ~', Hours Task Code NPT
- _-_-_ __
1/1/2008 17:00 - 19:00 2.00 REMCM C
19:00 - 19:30 0.50 REMCM C
19:30 - 21:30 2.00 REMC
21:30 - 23:00 1.50 REMC
23:00 - 00:00 1.00 REMC
1 /2/2008 100:00 - 01:00
01:00 - 02:45
02:45 - 03:00
03:00 - 03:30
03:30 - 04:30
04:30 - 08:00
08:00 - 09:10
09:10 - 17:30
17:30 - 18:30
18:30 - 20:00
20:00 - 22:00
22:00 - 23:00
23:00 - 23:45
1.00 REMC
1.75 REMC
0.25 REMC
0.50 REMC
1.00 REMC
3.50 REMC
1.17 REMC
8.33 REMC
1.00 REMC
1.50 REMC
2.00 REMC
1.00 REMC
Spud Date: 3/24/1982
Start: 12/10/2007 End: 1 /4/2008
Rig Release: 1/4/2008
Rig Number: N1
Phase Description of Operations
RUNPRD Saw flag at 8016'. RIH. Stall at 9020'.
RUNPRD RIH at 3 fpm reaming milled out cement area. Stalled twice at
9097'.
RUNPRD Mill cement inside 3-1/2" tubing. 1.5 bpm, 1800-2400 psi, 13
fph, 0.5-1 K wob.
Milled to 9118'. 4 stalls at 9118'.
RUNPRD Mill cement inside 3-1/2" tubing. 1.5 bpm, 1800-2400 psi, 10
fph, 0.5-1 K wob.
Milled softer cement below 9125', milled at 50 fph to top of
2-3/8" liner tag at 9140'.
Pick up and ream down and stalled again at 9140'.
RUNPRD Back ream up to 7800'. Ream down to top of 2-3/8" liner.
clean hole.
Drop 1/2" steel ball and circ 20 bbl very high vis Biozan pill
behind ball.
Ball on seat at 31 bbl. sheared open circ sub. Circ 2.6 bpm at
3900 psi.
RUNPRD Circ 20 bbl very high vis sweep around thru open circ sub.
Circ bottoms up at 2.6 bpm, 3900 psi.
RUNPRD POH with 2.8" milling BHA. Circ at 2.3 bpm at 2800 psi.
RUNPRD SAFETY MEETING. Review procedure, hazards and
mitigation for laying out BHA, press testing liner lap and M/U
next BHA.
RUNPRD Lay out 2.8" milling BHA.
RUNPRD Pressure test liner lao. 2000 osi for 30 min. Good liner lao .
Lost 60 psi during first 15 min and another 20 psi during last 15
min.
Final press = 1920 psi after 30 min.
RUNPRD M/U Cement milling BHA #22 with 1.87" HCC parabolic mill,
1-11/16" motor, circ sub, hyd disc, xo and 59 stds of 1" CSH.
Test each connection. Milling BHA OAL = 3,660'.
RUNPRD RIH to ~ 9140'.
RUNPRD Milll cement. Up Wt 22K Free spin .86 bpm ~ 3150 psi. Mill at
3520 psi 8-10 ft/hr.
Milled to 9204'.
RUNPRD Wiper trip to 7800'. RIH at 50 fpm to get higher AV
RUNPRD Mill cement. .9 bpm, 3300-3900 psi, 12 fph. Easy milling
below 9220'.
Slide in hole at 4 fpm from 9230-9250'.
Wiper trip up to top of liner. 26K up wt. 11 K down wt.
RUNPRD Mill cement stringers. 12-50 fph. 0.95 bpm, 3500-3900 psi,
0-2 K WOB.
Last cement was seen at 9260'.
Cleanout to 9400'. Clean wi er to 9100'.
RUNPRD RIH while milling at 0.9 bpm, 3300 psi, to 9600'. Wt check,
26K up wt.
RIH at 30 fpm to 10,000'. Pick up clean with 26K.
RIH clean to 11,000'. Pick up clean at 26K.
0.75 REMCM C RUNPRD RIH clean to 12,000'. Clean pick up at 28K.
RIH to 12650'. Slow pump to 0.3 bpm and lightly tag PBTD at
12 703'.
This in uncorrected CTD.
Printed: 1/14/2008 8:58:28 AM
BP EXPLORATION Page 25 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04 Spud Date: 3/24/1982
Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008
Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours ~~~ Task Code NPT Phase Description of Operations
1/2/2008 123:45 - 00:00 I 0.25
1/3/2008 00:00 - 02:00 2.00
02:00 - 05:00 3.00
05:00 - 05:15 0.251 REM
05:15 - 09:00 3.751 REM
09:00 - 09:30 0.50
09:30 - 10:40 1.17
10:40 - 12:00 1.33 PERFO P
12:00 - 12:15 0.25 PERFO P
12:15 - 15:00 2.75 PERFO P
15:00 - 17:20 2.33 PERFO P
17:20 - 19:10 1.83 PERFO P
19:10 - 20:10 I 1.001 PERFOBI P
RUNPRD Circ well to 2% KCL water with friction reducer. Haul off used
Biozan milling fluid.
Circ at 0.9 bpm at 3600 psi. 29K up wt.
RUNPRD Circ well to 2% KCL water with friction reducer.
RUNPRD Circ 15 bbl new high vis FloPro pert pill to bottom at 0.8 bpm,
3750 psi.
High circ press due to very long 1" CSH workstring of 3660'.
Lay in 15 bbl new FloPro pert pill while POH.
Held spill drill while POH.
RUNPRD SAFETY MEETING. Review procedure, hazards and
mitigation for standing back 1" CSH.
RUNPRD Pump 1/2" AL ball and open circ sub.
Lay out 1 jt of CSH to change breaks.
Stand back 59 stds of CSH.
RUNPRD Cut 102" of CT.
RUNPRD Install weld on connector. Pull test.30K Pressure test to 3300
psi.
LOWERI Load pipe shed
LOWERi PJSM up and handling guns
LOWERI PU 64 1.56" 6SPF 1606PJ oerforatina auns. total 860 .
ns Gun length 135.8.26'. Intervals to be perforated:'
450
11530-11640
11670-11710
11760-11850
11920-12140
12210-12260
12310-12350
12480-12690, Total perfs = 860'.
LOWERi PU 37 stands of 1"CSH. Perf BHA OAL = 3,649.51'.
LOWERI RIH with SWS 1.56" perforating BHA. Circ at 0.3 bpm at 330
psi.
Tagged PBTD at 12,701', up depth. Corrected up depth to
PBTD of 12,704'.
SWS GR log had tagged PBTD at 12,705'. Minus 1 ft for CIBP
that was set on bottom,
so true corrected PBTD = 12,704'.
LOWERI Pump 4 bbl FloPro pert pill. Insert 1/2" AL ball and displace
with 5 bbl FloPro. Displace with KCL water, Position bottom
perforation charge at 12,693' while circ ball to firing head. circ
at 1.1 bpm at 4200 psi. Very high circ pressure due to very
long 2-3/8" liner fluid friction.
Slow pump to 0.5 bpm, 1100 psi, at 28 bbl displacement. Ball
on seat at 39.5 bbls.
Fire uns on de th on th fe Iv. Firing head sheared at 3400 psi,
Bottom shot at 12,690'.
Good un firin indication. Up wt = 34K and fell back to 31 K
while pulling at 30 fpm.
Very little overpull after firing guns, total gun length with blanks
was 1358'. 860' of perfs.
20:10 - 22:00 1.83 PERFO P LOWERI POH with fired pert guns. Circ at 0.5 bpm, 900 psi.
Flow check at surface.
22:00 - 22:15 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and
Printed: 1/14/2008 8:58:28 AM
•
BP EXPLORATION Page 26 of 26
Operations Summary Report
Legal Well Name: 15-04
Common Well Name: 15-04
~' Event Name: REENTER+COMPLETE
'Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From - To Hours Task Code ~I NPT
1/3/2008 22:00 - 22:15 0.25 PERFO P
22:15 - 00:00 1.75 PERFO P
1/4/2008 00:00 - 00:45 0.75 PERFO P
00:45 - 01:00 I 0.251 PERFOBI P
01:00 - 05:00 I 4.001 PERFOBI P
05:00 - 07:00 2.00 RIGD P
07:00 - 09:00 2.00 WHSUR P
09:00 - 09:10 0.17 WHSUR P
09:10 - 09:30 0.33 WHSUR P
09:30 - 11:00 1.50 WHSUR P
11:00 - 11:20 0.33 WHSUR P
11:20 - 11:30 0.17 WHSUR P
11:30 - 12:30 1.00 WHSUR P
12:30 - 13:40 1.17 WHSUR P
13:40 - 15:00 1.33 WHSUR P
15:00 - 16:30 1.50 WHSUR P
16:30 - 18:00 1.50 WHSUR P
18:00 - 18:15 0.25 WHSUR P
18:15 - 20:00 I 1.751 WHSUR I P
20:00 - 21:30 I 1.501 RIGD I P
Spud Date: 3/24/1982
Start: 12/10/2007 End: 1/4/2008
Rig Release: 1/4/2008
Rig Number: N1
Phase I, Description of Operations
LOWERI mitigation for laying out 1"CSH.
LOWERi Lay out 1"CSH in singles.
LOWERI Lay out 1"CSH workstring in singles.
Flow check.
LOWERI SAFETY MEETING. Review procedure, hazards and
mitigation for laying out fired pert guns.
LOWERI La out fired erf uns and blanks. All shots fired.
Load out fired guns from pipe shed.
Well was perforated as per program with 860' total of perfs.
POST RIH with extra stds of 1"CSH and lay them out in singles.
POST PU nozzle. Jet stack and RIH to 2500'. Freeze protect with
MEOH. POH. Monotor well. No Flow.
POST PJSM or setting BPV.
POST Set BPV with dry rod.
POST Prep to Blow down reel with N2.
POST RU N2.
POST PJSM for the N2 blowdown.
POST Blow down reel with N2.
POST PJSM for pulling back CT.
POST Pop off well.Cut off CTC. Install grapple. Pull CT back to reel.
Clean pits.
POST Change stripper packoff. Stand back injector.
POST Prep to swap reels with bridge crane.
POST SAFETY MEETING. Review procedure, hazards and
mitigation for swapping reels with bridge crane.
POST Lower 2" E-Free coil to Veco trailer.
Prep reel stand.
Pick up 2-3/8" E-coil reel with Bridge crane and set in reel
stand.
POST N/D BOPE. N/U tree cap and press test.
RELEASED RIG AT 21:30 HRS, 01/04/2008.
TOTAL TIME FROM RIG ACCEPT TO RELEASE WAS 25
DAYS, 8.5 HRS.
Prep to move rig to A-12A.
ALL FURTHER INFORMATION WILL BE IN DIMS UNDER
WELL A-12A.
Printed: 1/14/2008 8:58:28 AM
r ~ •
bP BP Alaska ~R
Baker Hughes INTEQ Survey Report
INTEQ
e
Company: BP Amoco Date: 1!712008 Time: 11:30:27 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Wefl: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24!1982 00:00 63.0
Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi)
Wellpath: 15-046 Sarvey Cakulation Method: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: PB DS 15
TR-11-14
UNITED STATES :North Slope
Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N
From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.34 deg
Well: 15-04 Slot Name: 04
15-04
Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N
+E/-W -94.34 ft Easting : 676168.77 ft Longitude: 148 34 23.963 W
Position Uncertainty: 0.00 ft
Wellpath: 15-046 Drilled From: ' Well Ref. Point
500292072602 Tie-on Depth: 32.00 ft
Current Datum: 4:04 3/24/1982 00:00 Height 63.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/18/2007 Declination: 23.52 deg
Field Strength: 57668 uT Mag Dip Angle: 80.93 deg
Vertical Section: Depth From (1'VD) +N/-S +E/-W DireMion
ft ft ft deg
32.00 0.00 0.00 278.11
Survey Program for Definitive Wellpath
Date: 12/28/2007 Validated: Yes Version: 14
Actual From To Survey Tookode Tool Name
ft ft
50.00 9800.00 15-04 Boss Gyro (50.00-9800.00 BOSS-GYRO Sperry-Sun BOSS gyro multishot
9806.00 10218.67 15-046PB1 (9806.00.10218.67) MWD MWD -Standard
10240.00 12865.00 MWD (10240.00-12865.00) MWD MWD -Standard
Annotation
AfD TVD
ft ft
10218.67 8842.13 TIP
10240.00 8855.33 KOP
12865.00 8880.84 TD
Survey: MWD Start Date: 12/20/2007
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
~~?-(3~
i •
bP BP Alaska $
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco Date: 1/7/2008 Time: 11:30:27 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 63.0
Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi)
Wellpath: 15-046 Survey Calculation Method: Minimum Curvature Db: Orade
Survey
MD
ft 1!nd
deg Azim
deg TVD
ft Sys TVD
ft N/S
ft E/W
ft
10218.67 49.92 58.28 8842.13 8779.13 3.32 -3930.09
10240.00 53.57 60.26 8855.33 8792.33 11.87 -3915.69
10270.77 44.07 64.92 8875.57 8812.57 22.58 -3895.20
10300.09 49.04 72.85 8895.75 8832.75 30.18 -3875.36
10330.65 57.39 73.13 8914.03 8851.03 37.33 -3851.97
10360.46 65.54 70.43 8928.26 8865.26 45.53 -3827.13
10396.04 77.76 71.50 8939.44 8876.44 56.51 -3795.26
10426.82 91.93 73.43 8942.20 8879.20 65.72 -3766.11
10455.54 96.80 69.22 8940.01 8877.01 74.88 -3738.99
10486.58 96.03 65.13 8936.54 8873.54 86.84 -3710.57
10516.24 95.82 60.81 8933.48 8870.48 100.25 -3684.29
10546.06 95.94 56.62 8930.43 8867.43 115.65 -3658.95
10576.40 95.44 52.00 8927.42 8864.42 133.26 -3634.44
10606.40 92.43 48.08 8925.36 8862.36 152.47 -3611.50
10637.28 92.83 43.65 8923.94 8860.94 173.95 -3589.37
10666.34 92.89 39.07 8922.49 8859.49 195.73 -3570.20
10696.86 91.35 35.85 8921.36 8858.36 219.93 -3551.65
10727.22 93.35 36.68 8920.11 8857.11 244.39 -3533.71
10761.06 94.55 38.65 8917.78 8854.78 271.11 -3513.08
10791.00 93.32 43.75 8915.73 8852.73 293.58 -3493.41
10823.62 92.49 51.74 8914.07 8851.07 315.47 -3469.32
10854.70 95.81 55.51 8911.82 8848.82 333.85 -3444.37
10886.00 94.09 60.18 8909.12 8846.12 350.44 -3417.98
10916.58 96.06 63.73 8906.41 8843.41 364.76 -3391.10
10946.66 97.66 68.19 8902.82 8839.82 376.92 -3363.83
10978.52 96.18 72.76 8898.98 8835.98 387.49 -3334.03
11008.46 94.52 77.19 8896.19 8833.19 395.21 -3305.25
11039.50 93.29 81.96 8894.07 8831.07 400.81 -3274.80
11069.72 88.50 86.42 8893.60 8830.60 403.87 -3244.76
11100.34 88.99 91.66 8894.27 8831.27 404.38 -3214.16
11130.96 87.33 95.00 8895.25 8832.25 402.60 -3183.61
11160.80 85.33 91.08 8897.16 8834.16 401.02 -3153.88
11190.40 86.47 88.60 8899.28 8836.28 401.10 -3124.36
11220.12 90.40 92.25 8900.09 8837.09 400.88 -3094.67
11249.94 89.33 96.14 8900.16 8837.16 398.70 -3064.93
11280.02 85.82 99.91 8901.43 8838.43 394.51 -3035.18
11310.44 89.94 104.99 8902.56 8839.56 387.96 -3005.52
11339.76 86.09 107.79 8903.58 8840.58 379.69 -2977.41
11372.26 85.70 113.92 8905.90 8842.90 368.16 -2947.13
11398.12 88.90 117.29 8907.12 8844.12 357.00 -2923.85
11429.32 91.23 120.90 8907.09 8844.09 341.83 -2896.59
11461.44 91.07 115.93 8906.44 8843.44 326.55 -2868.35
11491.64 88.40 110.59 8906.58 8843.58 314.63 -2840.62
11521.82 91.57 108.77 8906.59 8843.59 304.47 -2812.21
11552.26 91.78 105.49 8905.70 8842.70 295.51 -2783.14
11585.64 90.06 103.47 8905.16 8842.16 287.17 -2750.82
11615.94 89.48 101.60 8905.29 8842.29 280.59 -2721.25
11645.66 88.06 102.04 8905.92 8842.92 274.50 -2692.16
11675.79 87.45 98.72 8907.10 8844.10 269.08 -2662.55
11705.71 87.51 95.83 8908.42 8845.42 265.29 -2632.91
11732.55 89.08 91.55 8909.22 8846.22 263.57 -2606.14
11762.75 92.16 87.64 8908.89 8845.89 263.78 -2575.95
11795.69 95.20 84.65 8906.78 8843.78 265.99 -2543.16
11fapN MapE
ft ft
5960191.37 672239.93
5960200.26 672254.13
5960211.44 672274.36
5960219.50 672294.02
5960227.19 672317.23
5960235.98 672341.87
5960247.70 672373.47
5960257.59 672402.40
5960267.38 672429.29
5960280.01 672457.43
5960294.02 672483.38
5960310.01 672508,35
5960328.19 672532,44
5960347.94 672554.92
5960369.93 672576.54
5960392.15 672595.20
5960416.78 672613.17
5960441.65 672630.53
5960468.85 672650.53
5960491.76 672669.66
5960514.21 672693.23
5960533.17 672717.74
5960550.37 672743.74
5960565.31 672770.27
5960578.11 672797.24
5960589.37 672826.79
5960597.77 672855.38
5960604.08 672885.68
5960607.84 672915.65
5960609.07 672946.22
5960608.01 672976.80
5960607.13 673006.56
5960607.90 673036.07
5960608.38 673065.76
5960606.90 673095.53
5960603.40 673125.37
5960597.55 673155.18
5960589.94 673183.47
5960579.12 673214.01
5960568.51 673237.55
5960553.99 673265.15
5960539.38 673293.74
5960528.11 673321.74
5960518.62 673350.38
5960510.34 673379.65
5960502.76 673412.15
5960496.88 673441.87
5960491.48 673471.09
5960486.75 673500.81
5960483.66 673530.54
5960482.56 673557.33
5960483.48 673587.51
5960486.46 673620.24
~'S DL.S Tool
ft deg/100ft
3891.29 0.00 MWD
3878.24 18.60 MWD
3859.46 32.90 MWD
3840.89 25.92 MWD
3818.75 27.33 MWD
3795.31 28.47 MWD
3765.31 34.46 MWD
3737.74 46.46 MWD
3712.19 22.38 MWD
3685.74 13.33 MWD
3661.62 14.50 MWD
3638.70 13.98 MWD
3616.91 15.24 MWD
3596.92 16.45 MWD
3578.03 14.39 MWD
3562.12 15.74 MWD
3547.18 11.69 MWD
3532.86 7.13 MWD
3516.21 6.80 MWD
3499.90 17.48 MWD
3479.14 24.59 MWD
3457.03 16.14 MWD
3433.24 15.85 MWD
3408.65 13.24 MWD
3383.37 15.65 MWD
3355.36 14.98 MWD
3327.95 15.74 MWD
3298.60 15.84 MWD
3269.29 21.65 MWD
3239.07 17.18 MWD
3208.57 12.18 MWD
3178.92 14.72 MWD
3149.70 9.20 MWD
3120.27 18.04 MWD
3090.53 13.53 MWD
3060.49 17.11 MWD
3030.19 21.49 MWD
3001.20 16.23 MWD
2969.60 18.85 MWD
2944.97 17.96 MWD
2915.85 13.77 MWD
2885.74 15.48 MWD
2856.60 19.77 MWD
2827.04 12.11 MWD
2797.00 10.79 MWD
2763.83 7.95 MWD
2733.62 6.46 MWD
2703.97 5.00 MWD
2673.89 11.19 MWD
2644.01 9.65 MWD
2617.27 16.98 MWD
2587.41 16.48 MWD
2555.26 12.93 MWD
by BP Alaska
Baker Hughes INTEQ Survey Report
1NTEQ
Company: BP Amoco Date: 1/7/2008 Time: 11:30:27 Page: 3
Field: Prudhoe Bay Co-0rdinate(NE) Reference: Well: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 63.0
Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi)
Wellpath: 15-046 Survey Calculation Method: Minimum Curvature Db: Orade
Survey
MD
ft Incl
deg Azim
deg TVD
ft Svs TVD
ft N/S
ft EIW
ft
11827.47 95.89 80.99 8903.71 8840.71 269.94 -2511.79
11856.83 94.15 78.78 8901.14 8838.14 275.08 -2483.00
11889.27 91.59 77.79 8899.51 8836.51 281.66 -2451.27
11921.85 89.23 84.07 8899.28 8836.28 286.79 -2419.12
11951.35 87.30 86.98 8900.17 8837.17 289.09 -2389.73
11982.97 86.04 91.36 8902.01 8839.01 289.55 -2358.17
12013.67 86.59 95.85 8903.98 8840.98 287.62 -2327.61
12044.17 90.98 100.68 8904.63 8841.63 283.24 -2297.45
12074.11 92.36 105.26 8903.76 8840.76 276.53 -2268.29
12106.51 89.39 110.20 8903.26 8840.26 266.66 -2237.45
12134.47 87.85 114.55 8903.94 8840.94 256.03 -2211.61
12166.81 87.94 120.96 8905.13 8842.13 240.98 -2183.02
12198.25 91.01 121.55 8905.41 8842.41 224.67 -2156.15
12233.59 92.70 123.43 8904.27 8841.27 205.70 -2126.36
12271.45 93.88 117.19 8902.10 8839.10 186.64 -2093.74
12304.95 85.94 113.59 8902.15 8839.15 172.29 -2063.51
12334.21 85.60 110.78 8904.31 8841.31 161.27 -2036.49
12363.61 87.37 107.08 8906.11 8843.11 151.75 -2008.74
12393.17 90.28 105.46 8906.72 8843.72 143.47 -1980.37
12424.13 93.74 102.64 8905.63 8842.63 135.96 -1950.37
12454.65 94.58 99.37 8903.42 8840.42 130.15 -1920.49
12485.65 94.86 96.95 8900.86 8837.86 125.77 -1889.91
12518.43 94.25 93.20 8898.26 8835.26 122.88 -1857.37
12547.13 92.89 91.44 8896.47 8833.47 121.72 -1828.75
12577.73 93.43 86.82 8894.78 8831.78 122.18 -1798.21
12610.65 92.40 83.07 8893.11 8830.11 125.08 -1765.46
12657.83 91.69 76.72 8891.42 8828.42 133.35 -1719.07
12681.87 91.96 73.11 8890.66 8827.66 139.60 -1695.87
12707.29 91.93 70.62 8889.80 8826.80 147.51 -1671.73
12737.48 91.94 67.82 8888.78 8825.78 158.21 -1643.53
12768.04 93.41 65.01 8887.35 8824.35 170.42 -1615.55
12805.23 94.36 61.11 8884.83 8821.83 187.23 -1582.48
12820.92 93.75 58.43 8883.72 8820.72 195.11 -1568.96
12865.00 93.75 58.43 8880.84 8817.84 218.14 -1531.48
MapN MapE
ft ft
5960491.14 673651.51
5960496.95 673680.17
5960504.27 673711.73
5960510.16 673743.75
5960513.15 673773.08
5960514.34 673804.61
5960513.14 673835.21
5960509.46 673865.46
5960503.43 673894.77
5960494.30 673925.83
5960484.27 673951.91
5960469.90 673980.84
5960454.23 674008.09
5960435.96 674038.31
5960417.67 674071.36
5960404.03 674101.92
5960393.65 674129.19
5960384.79 674157.15
5960377.17 674185.71
5960370.37 674215.88
5960365.26 674245.88
5960361.60 674276.55
5960359.47 674309.15
5960358.98 674337.79
5960360.16 674368.31
5960363.82 674400.97
5960373.18 674447.16
5960379.97 674470.20
5960388.44 674494.15
5960399.80 674522.09
5960412.67 674549.77
5960430.24 674582.44
5960438.44 674595.77
5960462.33 674632.69
VS DLS Tool
ft deg/100ft
2524.75 11.67 MWD
2496.97 9.56 MWD
2466.50 8.46 MWD
2435.39 20.59 MWD
2406.62 11.83 MWD
2375.44 14.39 MWD
2344.91 14.70 MWD
2314.43 21.39 MWD
2284.62 15.97 MWD
2252.69 17.79 MWD
2225.61 16.50 MWD
2195.19 19.81 MWD
2166.29 9.94 MWD
2134.12 7.15 MWD
2099.14 16.75 MWD
2067.18 26.02 MWD
2038.88 9.65 MWD
2010.07 13.93 MWD
1980.82 11.27 MWD
1950.05 14.41 MWD
1919.65 11.03 MWD
1888.76 7.83 MWD
1856.14 11.55 MWD
1827.64 7.74 MWD
1797.47 15.18 MWD
1765.46 11.80 MWD
1720.70 13.53 MWD
1698.61 15.05 MWD
1675.83 9.79 MWD
1649.41 9.27 MWD
1623.44 10.37 MWD
1593.07 10.77 MWD
1580.80 17.48 MWD
1546.94 0.00 MWD
~" ~ • •
np BP Alaska
Baker Hughes INTEQ Survey Report INTEQ
I Comp BynaComp Byna P Amoco Date: 12/26/2007 Time: 12:17:20 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: WeA: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 6 3.0
WeIL• 15-04 Section (VS) Reference: Well (O.OON,O.OOE,274.8 7Azi)
~'Vellpath: 15-046PB1 Survey Calcula[ion Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
~ Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: PB DS 15
TR-11-14
UNITED STATES :North Slope
Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N
From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.34 deg
Well: 15-04 Slot Name: 04
15-04
Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N
+E/-VV -94.34 ft Easting : 676168.77 ft Longitude: 148 34 23.963 W
Position Uncertainty: 0.00 ft
Wellpath: 15-046P61 Drilled From: 15-04
500292072670 Tie-on Depth: 9800.00 ft
Current Datum: 4:04 3/24/1982 00:00 Height 63.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/18/2007 Declination: 23.52 deg
Field Strength: 57668 nT Mag Dip Angle: 80.93 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
32.00 0.00 0.00 274.87
Survey Program for Definitive Wellpath
Date: 12/18/2007 Validated: Yes Version: 1
Actual From To Survey Toolcode Tool Name
ft ft
50.00 10314.50 Gyro (50.00-10314.50) (0) BOSS-GYRO Sperry-Sun BOSS gyro multishot
10315.10 12141.00 MWD (9806.00-12141.00) MWD MWD -Standard
Annotation
NID TVD ~
ft ft
9800.00 8476.66 TIP
9806.00 8481.70 KOP
12141.00 8903.73 TD
Survey: MWD Start Date: 12/18/2007
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
Survey
MD Inct Azim 1'VD Sys TVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/100ft
9800.00 32.86 276.10 8476.66 8413.66 -112.82 -3940.51 5960075.03 672232.25 3916.68 0.00 MWD
9806.00 32.83 276.10 8481.70 8418.70 -112.47 -3943.74 5960075.30 672229.00 3919.94 0.56 MWD
9842.47 28.93 281.30 8513.00 8450.00 -109.69 -3962.23 5960077.64 672210.45 3938.60 12.95 MWD
9871.21 25.10 286.55 8538.61 8475.61 -106.59 -3974.90 5960080.44 672197.72 3951.48 15.69 MWD
9913.33 19.10 297.78 8577.63 8514.63 -100.83 -3989.58 5960085.86 672182.91 3966.60 17.36 MWD
9943.03 15.56 313.01 8605.99 8542.99 -95.84 -3996.80 5960090.68 672175.58 3974.21 19.28 MWD
9973.15 14.37 335.50 8635.12 8572.12 -89.68 -4001.31 5960096.73 672170.92 3979.23 19.55 MWD
10001.47 15.65 359.41 8662.50 8599.50 -82.65 -4002.80 5960103.72 672169.26 3981.32 22.16 MWD
10031.41 19.47 16.47 8691.05 8628.05 -73.82 -4001.43 5960112.58 672170.43 3980.70 21.28 MWD
10061.61 23.96 29.84 8719.12 8656.12 -63.66 -3996.95 5960122.84 672174.67 3977.10 22.04 MWD
10092.71 30.55 34.76 8746.76 8683.76 -51.68 -3989.29 5960135.00 672182.05 3970.48 22.38 MWD
a~ ~ ~~~~
•
bP BP Alaska $
Baker Hughes INTEQ Survey Report irrTE
Q
Company: BP Amoco Date: 12/26/2007 Time: 12:17:20 Page: 2
Field: Prudhoe Bay Co-ordioate(NE) Reference: Well: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:04 3!2411982 00:00 63.0
Well: 15-04 Section (VS) Reference: Well (O.OON,OAOE,274.87Azi)
Wellpath: 15-046P61 Survey Calculation Method: Minimum Curvature Db: Orade
Survey
iVID
ft Inc!
deg Azim
deg TVD
ft Sys TVD
ft N/S
ft E/W
ft
10122.89 35.19 40.34 8772.10 8709.10 -38.74 -3979.28
10155.75 40.55 46.80 8798.04 8735.04 -24.19 -3965.35
10187.89 45.84 51.19 8821.47 8758.47 -9.80 -3948.73
10218.67 49.92 58.28 8842.13 8779.13 3.32 -3930.09
10248.85 55.10 61.03 8860.49 8797.49 15.40 -3909.43
10278.76 58.30 54.09 8876.92 8813.92 28.82 -3888.37
10309.18 61.99 47.18 8892.08 8829.08 45.55 -3868.01
10341.44 67.45 40.48 8905.86 8842.86 66.60 -3847.86
10367.92 69.93 32.87 8915.50 8852.50 86.37 -3833.15
10397.92 73.40 25.57 8924.94 8861.94 111.21 -3819.28
10424.30 77.16 21.27 8931.65 8868.65 134.62 -3809.15
10469.66 87.05 27.08 8937.88 8874.88 175.53 -3790.76
10502.65 92.85 33.12 8937.91 8874.91 204.04 -3774.23
10534.99 86.59 38.80 8938.06 8875.06 230.20 -3755.25
10561.59 90.43 46.30 8938.76 8875.76 249.77 -3737.29
10592.13 90.25 55.00 8938.57 8875.57 269.11 -3713.69
10622.61 87.36 59.15 8939.21 8876.21 285.67 -3688.12
10653.35 86.71 61.88 8940.80 8877.80 300.78 -3661.40
10682.59 89.79 66.83 8941.69 8878.69 313.42 -3635.07
10712.39 89.91 70.26 8941.77 8878.77 324.32 -3607.34
10743.81 90.37 74.31 8941.70 8878.70 333.88 -3577.41
10774.74 91.84 75.73 8941.10 8878.10 341.87 -3547.54
10804.36 92.52 78.09 8939.97 8876.97 348.57 -3518.71
10834.24 90.92 79.29 8939.08 8876.08 354.43 -3489.43
10863.64 91.69 76.13 8938.41 8875.41 360.69 -3460.71
10897.46 93.14 72.36 8936.98 8873.98 369.86 -3428.20
10927.02 93.99 69.20 8935.14 8872.14 379.57 -3400.34
10957.26 93.01 65.49 8933.30 8870.30 391.19 -3372.50
10988.08 91.14 66.90 8932.18 8869.18 403.62 -3344.32
11018.22 91.07 72.74 8931.60 8868.60 414.02 -3316.05
11053.16 91.97 77.15 8930.67 8867.67 423.09 -3282.33
11084.16 93.10 82.02 8929.30 8866.30 428.68 -3251.88
11113.62 92.64 85.09 8927.82 8864.82 431.99 -3222.64
11143.72 91.26 88.06 8926.80 8863.80 433.78 -3192.62
11183.20 88.10 91.34 8927.02 8864.02 433.99 -3153.15
11213.22 90.80 93.64 8927.31 8864.31 432.68 -3123.16
11243.48 94.83 97.25 8925.82 8862.82 429.82 -3093.09
11273.24 93.59 101.60 8923.64 8860.64 424.96 -3063.82
11305.20 92.26 105.19 8922.00 8859.00 417.57 -3032.77
11332.88 88.00 106.73 8921.94 8858.94 409.96 -3006.17
11362.76 88.50 109.17 8922.85 8859.85 400.75 -2977.76
11391.20 91.66 107.70 8922.81 8859.81 391.76 -2950.78
11421.24 89.78 104.09 8922.44 8859.44 383.54 -2921.90
11452.48 87.30 101.30 8923.23 8860.23 376.67 -2891.44
11481.38 89.14 97.01 8924.13 8861.13 372.08 -2862.93
11511.22 90.09 93.82 8924.33 8861.33 369.26 -2833.22
11541.70 88.34 93.15 8924.75 8861.75 367.41 -2802.80
11577.12 89.51 90.10 8925.41 8862.41 366.41 -2767.41
11605.46 91.81 95.96 8925.09 8862.09 364.91 -2739.12
11635.80 91.23 96.97 8924.28 8861.28 361.50 -2708.99
11665.80 90.86 100.61 8923.73 8860.73 356.91 -2679.35
11697.37 91.35 102.89 8923.13 8860.13 350.49 -2648.45
11730.15 92.52 104.96 8922.02 8859.02 342.60 -2616.65
MapN MapE
ft ft
5960148.17 672191.75
5960163.04 672205.34
5960177.81 672221.61
5960191.37 672239.93
5960203.93 672260.31
5960217.83 672281.05
5960235.04 672301.01
5960256.55 672320.66
5960276.67 672334.90
5960301.82 672348.18
5960325.46 672357.76
5960366.78 672375.19
5960395.68 672391.04
5960422.27 672409.40-
5960442.25 672426.90
5960462.14 672450.03
5960479.29 672475.20
5960495.02 672501.56
5960508.28 672527.59
5960519.82 672555.06
5960530.08 672584.75
5960538.77 672614.42
5960546.15 672643.08
5960552.69 672672.22
5960559.62 672700.78
5960569.55 672733.06
5960579.91 672760.68
5960592.18 672788.25
5960605.27 672816.13
5960616.32 672844.15
5960626.18 672877.64
5960632.48 672907.95
5960636.47 672937,10
5960638.97 672967.07
5960640.10 673006.52
5960639.50 673036.52
5960637.34 673066.66
5960633.17 673096.03
5960626.51 673127,24
5960619.52 673154.01
5960610.99 673182.63
5960602.63 673209.81
5960595.09 673238.88
5960588.94 673269.49
5960585.02 673298.09
5960582.90 673327.85
5960581.76 673358.31
5960581.59 673393.71
5960580.75 673422.02
5960578.05 673452.23
5960574.16 673481.96
5960568.46 673513.00
5960561.32 673544.97
VS DLS Tool
ft degl100ft
3961.61 18.35 MWD
3948.96 20.27 MWD
3933.63 18.92 MWD
3916.17 21.61 MWD
3896.61 18.62 MWD
3876.76 22.14 MWD
3857.90 23.13 MWD
3839.61 25.27 MWD
3826.64 28.36 MWD
3814.92 25.83 MWD
3806.82 21.25 MWD
3791.97 25.22 MWD
3777.92 25.38 MWD
3761.23 26.13 MWD
3745.00 31.66 MWD
3723.13 28.49 MWD
3699.06 16.59 MWD
3673.72 9.12 MWD
3648.55 19.93 MWD
3621.85 11.52 MWD
3592.84 12.97 MWD
3563.76 6.61 MWD
3535.60 8.29 MWD
3506.92 6.69 MWD
3478.84 11.06 MWD
3447.23 11.93 MWD
3420.30 11.05 MWD
3393.54 12.67 MWD
3366.52 7.60 MWD
3339.23 19.37 MWD
3306.40 12.88 MWD
3276.54 16.11 MWD
3247.69 10.52 MWD
3217.92 10.87. MWD
3178.62 11.54 MWD
3148.63 11.81 MWD
3118.42 17.87 MWD
3088.84 15.16 MWD
3057.28 11.96 MWD
3030.12 16.36 MWD
3001.03 8.33 MWD
2973.39 12.25 MWD
2943.91 13.55 MWD
2912.98 11.95 MWD
2884.18 16.14 MWD
2854.35 11.15 MWD
2823.88 6.15 MWD
2788.53 9.22 MWD
2760.22 22.29 MWD
2729.90 3.84 MWD
2699.98 12.19 MWD
2668.65 7.39 MWD
2636.30 7.25 MWD
- ~ ~!
by BP Alaska ~~
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco Date: 12/26/2007 Time: 12:17:20 Page: 3
Field: Prudhoe Bay
Site: PB DS 15 Co-ordinate(NE) Reference:
Vertical (TVD) Reference: Well: 15-04, True North
4:04 3/24/1982 00:00 6
3.0
Wetl: 15-04 Section (VS) Reference: Well (O.OON,O .OOE,274.8 7Azi)
R'ellpath: 15-046PB1 Survey Calcula tion Method: Minimum Curvature Db: Orade
Survey
~IID Ind Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/100ft
11760.73 96.06 107.66 8919.73 8856.73 334.04 -2587.39 5960553.45 673574.42 2606.42 14.54 MWD
11789.91 94.46 109.47 8917.06 8854.06 324.79 -2559.85 5960544.85 673602.17 2578.19 8.26 MWD
11820.93 92.21 113.95 8915.25 8852.25 313.34 -2531.09 5960534.07 673631.19 2548.56 16.14 MWD
11849.75 93.88 118.03 8913.72 8850.72 300.73 -2505.23 5960522.08 673657.34 2521.72 15.28 MWD
11885.51 92.39 121.29 8911.76 8848.76 283.06 -2474.20 5960505.14 673688.77 2489.31 10.01 MWD
11922.17 93.75 118.09 8909.80 8846.80 264.93 -2442.41 5960487.76 673720.98 2456.09 9.47 MWD
11949.69 93.44 114.75 8908.07 8845.07 252.72 -2417.81 5960476.13 673745.85 2430.54 12.16 MWD
11979.59 91.94 113.36 8906.67 8843.67 240.54 -2390.54 5960464.60 673773.40 2402.34 6.84 MWD
12010.11 91.20 110.09 8905.83 8842.83 229.25 -2362.21 5960453.97 673801.99 2373.14 10.98 MWD
12040.51 90.98 107.35 8905.25 8842.25 219.50 -2333.42 5960444.90 673831.00 2343.63 9.04 MWD
12070.45 91.41 105.26 8904.63 8841.63 211.09 -2304.69 5960437.17 673859.91 2314.29 7.13 MWD
12100.25 90.55 107.21 8904.12 8841.12 202.76 -2276.09 5960429,51 673888.70 2285.08 7.15 MWD
f2141.00 90.55 107.21 8903.73 8840.73 190.71 -2237.16 5960418.37 673927.89 2245.28 0.00 MWD
Ti~~ = FMC GEN 2
WELLHEAD = FMC
ACTUATOR = AXELSON
KB. ELEV = 63'
BF. ElEV =
KOP = 3039'
Max Angle = 98 @ 10947'
Datum MD = 10251'
Datum TV D = 8800' SS
DRLG DRAFT
13-3/8" CSG, 72#, L-80, ID = 12.347"
Minimum ID =1.920" @ 9150'
2-3/8" Liner, STL Pin
3-1/2" TBG, 9.2#, 13-CR..0087 bpf, ID = 2.992" I~ 9078'
17" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I-i 9167'
3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I 9202'
TOP OF 7" LNR 9270'
9-5/8" CSG, 47#, L-80, ID = 8.681" 9588'
3.0" BKR DEPLOY SLV, ID = 2.250" 9820'
3" X 2-3/8" XO, ID = 1.92" 9827'
PERFORATION SUMMARY
REF LOG: SWS MEMORY CNL/GWCCL OF 12/28/07
ANGLE AT TOP PERF: 86° @ 11,350'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1-11/16" 6 11350 - 11450 Open 01/04/08
1-11/16" 6 11530 - 11640 Open 01/04/08
1-11/16" 6 11670 - 11710 Open 01/04/08
1-11/16" 6 11760 - 11850 Open 01/04/08
1-11!16" 6 11920 - 12140 Open 01/04/08
1-11/16" 6 12210 - 12260 Open 01/04/08
1-11/16" 6 12310 - 12350 Open 01/04/08
1-11/16" 6 12480 - 12690 Open 01/04/08
4-1/2" SCAB LNR, 12.6#, L-80, .0152 bpf., ~ = 3.958"
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276"
10438'
10460'
15-04B
SAFETY NOTES: 3-112" CHROME TBG.
3-1 /2" HES X NIP, ID = 2.813"
9-5/8" X 7" BKR LNR TOP PKR, ID = ???
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3354 3342 19 MMG DMY RK 0 07/30/06
3 5556 5217 34 MMG DMY RK 0 07/30/06
2 7286 6612 42 MMG DMY RK 0 01 /30/04
1 8921 7798 42 MMG DMY RK 0 01 /30/04
8980' ~ 3-1/2" HES X NIP, ID = 2.813"
9002' 7 X 3-1/2" PKR S-3 PROD PKR, ID = 3.875
9027' 3-1 /2" HES X NIP, ID = 2.813"
9087' UNIQUE OVERSHOT
9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ID = 4.0"
9115' 3-1/2" BAKER SEAL BORE EXTENSION
9124' 3-1/2" BAKER CONCENTRENIC COUPLING
9125' 3-1/2" BAKER SEAL BORE EXTENSION
9130' 3-1/2" BAKER MILLOUT EXTENSION
9159' 9-5/8" X 4-1/2" BKR HYFLO HNGRw/TIEBACK
9144' Top of 2-3/8" Liner
9144' Top of Cement
9171' 3-112" OTIS XN NIP, ID = 2.75"
9202' 3-1/2" WLEG, ID = 2.992"
9189' ELMD TT LOGGED 12/04/90
2-318" Liner cni'ed and perfed 12865'
9806' I~ BTT Mech Whipstock
CIBP 12704'
12064' I~ ~~
LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~ 12098'
DATE REV BY COMMENTS DATE REV BY COMMENTS
04/26182 ORIGINAL COMPLETION
12/04190 LAST WORKOVER
01118104 DAV/KA CTD SIDETRACK (15-04A)
01/04/08 NORDICI CTD SIDETRACK (15-046)
PRUDHOE BAY UNff
WELL: 15-046
PERMff No: 2071380
API No: 50-029-20726-02
SEC 22, T11 N, R14E, 4012.86' FEL 8~ 1330.03' FNL
BP Exploration (Alaska)
03/06/08
~chlaml~erger
N0.4621
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite aoo Alaska Oil & Gas Cons Comm
Anchorage, AK 6951)3-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay,Pt.Mac,Milne Pt,Orion,Lisburne
UIn11 _Inh 1t Inn Daccrintinn Data BL Colnr CD
C-41A 12021141 MEM LDL 02/25/08 1 1
MPS-O1A 11970714 SCMT '~} _ C 02/21/08 1 1
P1-06 11975757 PROD PROFILE ~ 03/02/08 1 1
P1-05 11998992 PROD PROFILE ~ 02/29/08 1 1
Pi-06 11975757 SCMT /Qj '~ ~ 03/02/08 1 1
09-23A 12045070 USIT ~ - G ~ 03/02/08 1 1
L5-34 12057596 PROD PROFILE S ~ 02/28/08 1 1
W-40 11970816 PRODUCTION LOG -j 03/04/08 1 1
15-04B 12005202 MCNL ~d - t G 12/28/07 1 1
C-35B 12021139 MCNL t 01/26/08 1 1
X-20A 11661178 CH EDIT PDC GR (MEM CORRELATION) _I 10/26/07 a'~ 1
L-219 12017479 CH EDIT PDC GR (IBC) - [ /(p 01/02/08 1
PLEASE ACKNOWLEDGE RECEIPT B,Y ~l~.;Nt~IG°`ANq kitlgUHLyINCiiONE DOPY EACH I O:
BP Exploration (Alaska) Ina
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 ~ ~ t~ i`~ t ~` ~~U~i
Date Delivered
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
t3
02/2/0$
~c~l~b~~ge~
NO. 4599
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay,Polaris,Lisburne
Wnll _Inh $ Inn rlnc ,nf:n.. n~f~ of n..l..- rn
W-216 40016312 OH MWD/LWD EDIT - _ ~ 01/07/08 2 1
LGI-04 11970706 RST ~_p q 12/31/07 1 1
W-45 40016146 OH MWD/LWD EDIT '}- ( 12/18/07 2 1
15-046 12005202 CH EDIT PDC GR (SCMT) ~~- ~ 12/28/07 1
C-16B 11209604 MCNL ~Q(o-pS ~ / C 05/19/06 1 1
B-18 11962779 RST '¢ 01/05/08 1 1
-aG e~v~~~~v ~~~.a-vVG f~GV G11' 1 V I JIV1911~IV /'\I~/V RC 1 VRI\II`~V VIYC VVrI C/llin 1 V.
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1 _.
900 E. Benson Blvd. =~~
Anchorage, Alaska 99508
Date Delivered: r ~: .,; Q ~ ~~fs
Alaska Data & Consulting Services
2525 Gambell Street, Suite 4 ~
Anchorage, AK 99503-28 8 ~
ATTN: Beth `n /
W
Received by:
•
f
Date 02-25-2008
Transmittal Number:92929
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
If you have any questions, please contact Douglas Dortch at the PDC at 564-4973
elivery Contents
CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells:
?-09C ~v~'-139 '~~59~/~•-
15-046 ~0~._13~ '~ lS-°!'IG
15-04BPB1 o'~o'f•-130 ~~59~i/'.}
18-13B ~p~- /b ~ "' 169~'b
L-219 via 20~-- lK~ '`-59yg
~---~.
MPF-19 ~GS¢ ~° o.rg roof oorrec~. ~t2 f}P.= ~#' 15~~ m PN-(9
= aun wok dare i~ You pu~l- lie
MPF-19L1 ~~ ~ 1M~l~I-~`~~-I
v fCse.KOl q,~p
Ple sa a Sign ar~d Ret~rone copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
~-[-~ - r-tease
~!^~i~vte -
~~
r, ti~ y
~° ~~ ~~ ?(~1Cl~i
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 1 9-66 1 2
Date 02-25-2008
Transmittal Number:92929
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
If you have anv questions, please contact Douglas Dortch at the PDC at 564-4973
Delivery Contents
1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells:
o2-o9c ~v~- t39 ~-,5 9~i~r
15-04B ~o~_t3~ '~ t6~~
15-04BPB1o~p~-t3~ ~~59`~'-}
18-13B ~p~- /b ~ "' 169 ~~'~
L-219 U~4 20~-- t~l~ ''-59y°i
MPF-19 ~~s¢ fwo o,~e roc} ceorrec'F• ~e AP.T ~ ?a~~ m ~N-(9
= awe ~oI dupe iR you puf 1.L~e
MPF-19L1 ~_ f 1M~kl-i9~1 _
v r e5~eu.al q,e-o
Please Sign ar~d Ret~-one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
¢ ~ k~:
hey F `~ ~ _.
i- r
~~al ~~ I~~w~~ l~~ti<~~ l~°~Irtt~sd~~~tat
aitt~°ltt~t
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 1 9-66 1 2
~G~r~Nt~e -
~~~
01 /18/08
r
>11~11f~~W~i~~s1"
NO. 4560
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay, Lisburne, Pt. Mac, Orion, Borealis
WPII _Inh it 1 nn flncn ..a:.... n..a., o~ n_~_-
L-219 11966240 MDT `}- IC 12/22/07 1
L-114A 11970807 LDL = 12/30/07 1
L-116 11962777 LDL ~ "" ~ 12/31/07 1
V-211 12021135 MEM INJECTION PROFILE ~C(,-aa(~ 12129/07 1
V-216 12021136 MEM INJECTION PROFILE U 12/30/07 1
L-219 12017479 ISOLATION SCANNER CBL _ L. 01/02/08 1
P2-16 11975750 INJECTION PROFILE 12/31/07 1
F-32 11970707 LDL ~} - 01/04108 1
15-04B 12005202 MEM CEMENT BOND LOG - 12/28/07 1
G-31A 11962778 SCMT ~ - C 01/01/08 1
S-26 11978425 USIT 12/29/07 1
02-16C 11628793 MCNL ~- ~ 08/28/07 1 1
G-04B 11628765 MCNL - c st 04/06/07 1 1
K-02D 11209613 MCNL Ik , C, 07/21/06 1 1
17-07B 11649940 MCNL - ¢1 ~ 02/17/07 1 1
L2-28 11975742 RST - 12/05/07 1 1
Z-06 11968821 RST ~ - 12/13/07 1 1
ra.caaa~ /al.r\rvVVVLtUbt KtI.tIY I CT JiIaNINl7 AIVU Kt 1 UKNIIV(i UNt: C:UF'Y tAt:H I U:
BP Exploration (Alaska) Inc. ~.,; t~n..~
Petrotechnical Data Center LR2-1 ~ "-~
900 E. Benson Blvd. -~,b~-~ '~ _ ,~~ ~ ~„-'-'"
Anchorage, Alaska 99508 n
.,i.
Date Delivered: aE{~~~~ ~ ;~ ?0~~~
'cr~`i
Alaska Data & Consulting Services
2525 Gambell Street, Suite 00
Anchorage, AK 99503- 83
ATTN: Beth
Received by:
~~
rir~
BAKER
NUGNES
INTEQ
7260 Homer Drive
Anchorage, Alaska 99518
Te1907-267-6600
Fax 907-267-6623
To Whom It May Concern: January 18, 2008
Please find enclosed directional survey data for the following wells:
18-13BPB 1
18-13BPB2
18-13BPB3
18-13B
K-14A
H-24A~Z,
15-04BPB 1
15-04B
Enclosed for each well is:
tea copies of directional survey reports
lea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration(Alaska)Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
RECEIVED BY: F~~ ~ ~~~~ ,State of Alaska AOGCC
DATE: 1 ~ J~_ ~,~o~~
Cc: State of Alaska, AOGCC
0 0 ~ d a
SARAH PALlN, GOVERNOR
17a~~~r ~t ~~f~ 0~ ,~a`asC~taST 333 W. 7th AVENUE, SUITE 100
C~1sStsli 1ZsA~1`I011T CQ~'IIS'~7'I01s ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Sean McLaughlin
CT Drilling Engineer
BP Exploration Alaska, Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-04B
BP Exploration Alaska, Inc.
Permit No: 207-138
Surface Location: 1206' FNL, 237' FWL, SEC. 22, T11N, R14E, UM
Bottomhole Location: 4232' FSL, 1461' FEL, SEC. 21, T11N, R14E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for permit to redrill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field in (pager).
DATED this . day of October, 2007
cc: Department of Fish & Game, Habitat Section w/ o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ~ ~ ~i{~`` ~~
l~
ALAS~IL AND GAS CONSERVATION COMMI~N X ~pr~.~
PERMIT TO DRILL jo~~ ,('`~'
20 AAC 25.005
.~ ~ .`
.~_~~~
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for:
^ Coalbed Methane ^ Gas Hydrates
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ^ Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
PBU 15-046
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 12650 TVD 8820ss 12. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Property Designation:
ADL 028306 Pool
FWL, SEC. 22, T11 N, R14E, UM
1206
FNL, 237
Top of Productive Horizon:
4002' FEL, SEC. 21, T11N, R14E, UM
1298' FNL
8. Land Use Permit:
13. Approximate Spud Date:
November 15, 2007
,
Total Depth:
4232' FSL, 1461' FEL, SEC. 21, T11N, R14E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
27500'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-676169 y-5960280 Zone-ASP4 10. KB Elevation
(Height above GL): 63' feet 15. Distance to Nearest Well Within Pool:
224'
16. Deviated Wells: Kickoff Depth: 9800 feet
Maximum Hole An le: 92 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2140 Surface: 3020
18; Casin Pr ram: S `cificatio ns To - Settin ' De th -Bo ttom uanti of Cement c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
3" 2-3/8" 4.7# L-80 STL 3505' 9145' 7966' 12650' 8820' 92 sx Class'G'
1g; PRESE NT WELL CONDITION S UMMARY (To be completed for'Redrill and Re-entry Operations)
Total Depth MD (ft):
12295 Total Depth TVD (ft):
8897 Plugs (measured):
None Effective Depth MD (ft):
12064 Effective Depth TVD (ft):
8914 Junk (measured):
None
.Casing length Size Cement Volume MD TVD
Conductor /Structural 110' 20" 400 sx Permafrost II 110' 110'
Surface 2649' 13-3/8" 2000 sx Fondu 400 sx PF'C' 2649' 2649'
Intermediate
Production 9588' 9-5/8" 500 sx Class'G' 9588' 8305'
Liner 1190' 7" 350 sx'G' (7" 26# L-80, Liner Tieback 2451' - 9167') 927()' - 10460' 8061' - 8940'
Liner Tieback 1279' 4-1/2" Liner Tieback 9159' - 10438' 7677' - 8940'
Liner 2278' 2-3/8" 78 sx Class 'G' 9820 - 12098' 8494' - 8912'
Perforation Depth MD (ft): 10360' - 12061' Perforation Depth TVD (ft): 8930' - 8914'
20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387
Printed Name can McLau hlin Title CT Drilling Engineer
Prepared By Name/Number:
Si nature ,/L. ~ Phone 564-4387 Date +G C~ Sondra Stewman, 564-4750
Commission Use Onl
Permit To Drill
Number:a~~~3~~ API Number:
50-029-20726-02-00 Permit Approval See cover letter for
Date: other re uirements
Conditions of Approval: 1
If box is checked, well may not be used to explore for, test, or produce coalbed me~th/ane, gas hydrates, or gas contained shales: U(
Samples Req'd: Yes L10 No Mud Log Req'd: ^ Yes L10 No
H S Measures: ~J Ye~^ N Directional Survey Req'd: Yes ^ No
Other: 3~e51~~~ ~~5~ c.~S 'e~Grr~
/~ ~ D~ APPROVED BY THE COMMISSION
Date ~ ~ ,COMMISSIONER
Form 10-401 Revised 12/2005 ("1 n ~ ~ I n ~ Submit In Duplicate
by
To: Tom Maunder, Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Sean McLaughlin, CTD Engineer
Date: October 4, 2007
Re: Prudhoe Bay 15-04B Permit to Drill Request
The sidetrack, 15-04B, is scheduled to be drilled by Nordic 1 around November 15, 2007. The plan calls for
a slimhole lateral with a solid liner and 1000 ft of perforations in Zone lA.
Pre-Rig Work: The pre CTD work is slated to begin on October 15th, 2007.
1. O Passed MIT-IA, -OA Done 6/7/07
2. S Caliper inspection to 9900'
3. E Set 2-3/8" CIBP at 9850'
4. O PT CIBP to 2000 psi
5. E Set Baker 3-1/2" x 4-1/2" whipstock lowside at 9800'. 3O~ _ -30
6. O PPPOT-IC, -T; LDS
7. O PT MV, SV, WV
8. O Blind and bleed lines, remove well house, level pad
Rig Work:
1. MIRU and test BOPE to 250 psi low and 3500 psi high
2. Mi112.74" window at 9,800' and 10' of openhole. Swap the well to Flo-Pro.
3. Drill Build: 3" OH, 900' (20 deg/100 planned)
4. Drill Lateral: 3" OH, 1950' horizontal (10 deg/100 planned) -;~ ~S ~e`~~1
5. Run 2 3/8" solid liner leaving TOL at 9145' 1 Y
6. Pump primary cement fob to TOL, 19 bbl of 15.8 ppg cmt planned
7. Run CO assembly
8. Run MCNL/GR/CCL log
9. Test liner lap to 2000 psi.
10. Perforate, planned 1000ft.
11. Freeze protect well, Set BPV, RDMO
Post-Rig Work
1. Pull BPV
2. Install well house. Hook up flow line.
Mud Program:
• Well kill: 8.6 ppg brine
• Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 3"
Casing Program:
• 2 3/8", 4.7# , L-80, STL connection Solid liner - 9145' to 12650' MD
• A minimum of 19 bbls 15.8 ppg cement will be used for liner cementing.
• TOC planned at 9145 ft (TOL).
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will be tested to 250 psi and 2500 psi.
Directional
• See attached directional plan. Max. planned hole angle is 92 deg.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 27500'
• Distance to nearest well within pool - 224' ft to 15-48
Anticollision Summary
• 15-06A - 611' ctr-ctr, Status: Active well; 15-04B will be drilled towards the toe of 15-06A
• 15-23A - 644' ctr-ctr, Status: Active well; During the build section 15-04B with be drilled 185'
TVD above 15-23A
• 15-26B - 524' ctr-ctr, Status: Active well; Near TD 15-04B will be 107' TVD below 15-26B
• 15-48 - 224' ctr-ctr, Status: P&A'd
• 15-48A - 633' ctr-ctr, Status: P&A'd
Logging
• MWD directional and Gamma Ray will be run over all of the open hole section.
• A cased hole GR/CCL/CNL log will be run.
Hazards
• The maximum recorded H2S level on DS 15 is 40 ppm on 15-20C
• Lost circulation risk is low.
Reservoir Pressure
• Res. press. is estimated to be 3,020 psi at 8,800'ss (6.6 ppg EMW).
Maximum surface pressure with gas (0.10 psilft) to surface is 2140 psi.
Sean McLaughlin
CTD Drilling Engineer
564-4387
CC: Well File
Sondra Stewman/Terrie Hubble
TREE = FMC GEN 2
WELLHEAD= FMC
ACTUATOR = AXELSON
KB. ELEV = 63'
BF. ELEV =
KOP = 3039'
Max Angle = 93 @ 11985'
Datum MD = 10240'
Datum TV D = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347"
Minimum ID =1.920" @ 9827"
3" X 2-3/8" XO
3-1/2" TBG, 9.2#, 73-CR, .0087 bpf, ID = 2.992" ~-~ 9078'
7" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I~ 9167'
3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 11 9202,
TOP OF 7" LNR 9270'
9-5/8" CSG, 47#, L-80, ID = 8.681" 9588'
PERFORATION SUMMARY
REF LOG:
ANGLEATTOPPERF: 70° @ 10360'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1-9/16" 6 10360 - 10380 O 05/30/07
1-11/16" 6 10526 - 10556 O 04/14/07
1-11/16" 6 10648 - 10708 O 04/14/07
1-11/16" 4 10790 - 10810 O 01/15/04
1-11/16" 4 10975 - 10995 O 01/15/04
1-11/16" 4 11030 - 11230 0 01/15/04
1-11/16" 4 11330 - 11520 0 01/15/04
1-11/16" 4 11530 - 11930 O 01/15/04
1-11/16" 4 12010 - 12061 O 01/15/04
~4-1/2" SCAB LNR, 12.6#, L-80, .0152 bpf., ID = 3.958" ~
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276"
15-04A
SAFETY NOTES: 3-712" CHROME TBG.
2199' -i 3-1/2" HES X NIP, ~ = 2.813"
2451' 9-5/8" X 7" BKR LNR TOP PKR, ID = ???
GAS LIFE MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3354 3342 19 MMG DMY RK 0 07/30!06
3 5556 5217 34 MMG DMY RK 0 07/30/06
2 7286 6612 42 MMG DMY RK 0 01!30/04
1 8921 7798 42 MMG DMY RK 0 01/30/04
8980' 3-1 /2" HES X NIP, ~ = 2.813"
9002' 7 X 3-1 /2" PKR S-3 PROD PKR, ~ = 3.875
9027' 3-1/2" HES X NIP, ID = 2.813"
9087' UNIQUEOVERSHOT
9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ~ = 4.0"
9115' 3-1/2" BAKER SEAL BORE EXTENSION
9124' 3-1/2" BAKER CONCENTRENIC COUPLING
9125' 3-1/2" BAKER SEAL BOREIXTENSION
9130' 3-1/2" BAKER MILLOUT IXTENSION
91~ 9-5/8" X 4-1/2" BKR HYFLO HNGRwlTIEBACK
9171' ~ 3-1/2" OTIS XN NIP, ID = 2.75"
9202' 3-1/2" WLEG, ID=2.992"
9189' ELMD TT LOGGED 12/04/90
MILLOUT WINDOW 10194' - 10216'
9 820' I-~ 3.0" BKR DEPLOY SLV, ID = 2.250"
9827' 3" X 2-3/8" XO, m = 1.92"
10194' TOP OF WHIPSTOCK (1/2004)
12064' H PBTD
LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~-i 12098'
DATE REV BY COMMENTS DATE REV BY COMMENTS
04/26/82 ORIGINAL COMPLETION 05/28/07 JAF/TLH CORRECTIONS (SCAB LNRS)
12/04190 LAST WORKOVER 06/01/07 CJA/PAG ADPERFS (05/30/07)
01/18/04 DAV/KA CTD SIDETRACK (15-04A)
01/30/04 DTR/KAK GLV GO
07/30/06 DRF/PAG GLV GO
04/29/07 SGS/TLH PERFS (04/14/07)
PRUDHOE BAY UNIT
WELL: 15-04A
PERMfT No: 82031140
API No: 50-029-20726-01
SEC 22, T11 N, R14E, 4012.86' FEL & 1330.03' FNL
BP I]cploratlon (Alaska)
TREE = FMC GEN 2
WELLHEAD= FMC
ACTUATOR= AXELSON
KB. ELEV = 63'
BF. ELEV =
KOP = 3039'
Max Angle = 93 ~ 11985'
Datum MD = 10240'
Datum TV D = 8800' SS
15 -O 4 ~ SAFETY NOTES: 3-1 /2" CHROME TBG.
Proposed CTD Sidetrack
13-3/8" CSG, 72#, L-80, ID = 12.347" 2649'
Minimum ID =1.920" @ 9827"
3" X 2-3/8" XO
~ 3-1/2" TBG, 9.2#, 13-CR, .0087 bpf, ID = 2.992" I
~ 7" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I
3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" ~ 9202'
TOP OF 7" LNR 9270'
9-5/8" CSG, 47#, L-80, ID = 8.681" 9588'
3.0" BKR DEPLOY SLV, ID = 2.250" ~-i 9820' 1
3" X 2-3/8" XO, ID = 1.92" 9827'
PERFORATION SINTMRY
REF LOG:
A NGLE AT TOP P3~F: 70° @ 10360' MLLOUf V~DO/V 10194' - 10216
Note: Refer to Reduction DB for historical data
SQE SPF INiB2VAL OATE
1-9/16" 6 10360- 10380 O 05/30/07
1-11116" 6 10526- 10556 O Oata07
1-1v1s° s 10648-1o7os 0 oalao7
1-1v1s" a 10790- 10810 0 ov15/oa
1-11/16" 4 10975- 10995 O 01/15104
1-11/16" 4 11030- 11230 O 01/15/04
1-11/16" 4 11330- 11520 O 01/15/04
1-11/16" 4 11530- 11930 O 01/15/04
1-11/16" 4 12010- 12061 O 01/15/04
4-112" SCAB LNR, 12.6#, L-80, .0152 bpf., ID = 3.958" 10438'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10460'
2199' ~ 3-1/2" HES X NIP, ID= 2.813"
2451 9-5/8" X 7" BKR LNR TOP PKR, ID = ???
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
4 3354 3342 19 MMG DMY RK 0 07/30/06
3 5556 5217 34 MMG DMY RK 0 07/30/06
2 7286 6612 42 MMG DMY RK 0 01!30/04
1 8921 7798 42 MMG DMY RK 0 01/30/04
8980' - ~ 3-1 /2" HES X NIP, ~ = 2.813"
9002' 7 X 3-1/2" PKR S-3 PROD PKR, ID = 3.875
9027 3-1/2" HES X NIP, ID = 2.813"
9087 UNIQUE OV ERSHOT
9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ID = 4.0"
9115' 3-1/2" BAKER SEAL BORE EXTENSION
9124' 3-1/2" BAKER CONCENTRENIC COUPLING
9125' 3-1/2" BAKER SEAL BORE EXTENSION
9130' 3-1/2" BAKER MILLOUT IXTENSION
9159' 9-5/8" X 4-1/2" BKR HYFLO HNGR w /TIEBACK
9145' Top of 2-3/8" Liner
9145' Tch .,~ ~ .,..;_;,t
9171' 3-1 /2" OTIS XN NIP, ID = 2.75"
9202' 3-1/2" WLEG, ID = 2.992"
9189' ELMD TT LOGGED 12/04/90
~ 2-3/8" cmt'ed and perfect 12650'
9800' I~P,1ech Whipstock
9850' 1~2-3I8" CIBP
12064' I~ PBTD
2-3/8" LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~-j 12098'
DATE REV BY COMMENTS DATE REV BY COMMENTS
04/26182 ORIGINAL COMPLETION 05/28/07 JAF/TLH CORRECTIONS (SCAB LNRS)
12/04/90 LAST WORKOVER 06/01!07 CJA/PAG ADPERFS (05/30/07)
01118104 DAV/KA CTD SIDETRACK (15-04A)
01/30/04 DTR/KAK GLV GO
07/30/06 DRF/PAG GLV GO
04/29/07 SGS/TLH PERFS (04/14/07)
PRUDHOE BAY UNrr
WELL: 15-04A
PERMfr No: 2031140
API No: 50-029-20726-01
SEC 22, T11 N, R14E, 4012.86' FEL & 1330.03' FNL i
BP Exploration (Alaska)
by BP Alaska
Baker Hughes INTEQ Planning Report
~ilr
s~:~
INTEQ
Compaaye BP Amoco Date: 10/3/2007 Time: 11:17:30 Page: 1
field: Prudhoe Bay Co-ord®ate(NE) Reference: Wetl: 15-04, True North
Site: PB DS 15 Vertical (TVD) Reference: 4:043/24/1982 00:00 63.0
.Well: 15-04. Sectioe (VS)Referencee Well (O.OON,t).OOE,90.OOAzi)
Wellpath; Plan 6 15-046 Survey Cakulatioe Method: Minimum Curvature Dh: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: PB DS 15
TR-11-14
UNITED STATES :North Slope
Site Position: Northing: 5958837. 36 ft Latitude: 70 17 35.236 N
From: Map Fasting: 676296.98 ft Longitude: 148 34 21.213 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft ~ Grid Convergence: 1.34 deg
Well: 15-04 Slot Name: 04
15-04
Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N
+E/-W -94.34 ft Fasting : 676168.77 ft Longitude: 148 34 23.963 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 6, 15-046 Drilled From: 15-04
50-029-20726-02-00 Tie-on Depth: 9800.00 ft
Current Datum: 4:04 3/24/1982 00:00 Height 63 .00 ft Above System Datum: Mean Sea Level
Magnetic Data: 1/10/2008 Declination: 23.48 deg
Field Strength: 57669 nT Mag Dip Angle: 80.93 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
32.00 0.00 0.00 90.00
Plan: Plan #6 Date Composed: 9/25/2007
copy Sean M.'s Plan 6 Version: 9
Principal: Yes Tied-to: From: Definitive Path
Targets
Map ..Map <-- Latitude --> <- Longitude ->
Name Description TVD +N/-S +E/-W Northing.. Eastitig Deg Min Sec Deb Mig Sec
Dip. Dir. ft ft ft ft ft
15-046 Fault 1_2 63.00 870.92 -4470.87 5961046.00 671679.00 70 17 58.005 N 148 36 34.299 W
-Polygon 1 63.00 870.92 -4470.87 5961046.00 671679.00 70 17 58.005 N 148 36 34.299 W
-Polygon 2 63.00 -317.62 -4038.59 5959868.00 672139.00 70 17 46.319 N 148 36 21.679 W
15-046 Potygon 63.00 274.03 -3204.43 5960479.00 672959.00 70 17 52.141 N 148 35 57.372 W
-Polygon 1 63.00 274.03 -3204.43 5960479.00 672959.00 70 17 52.141 !N 148 35 57.372 W
-Polygon 2 63.00 -55.12 -1581.60 5960188.00 674589.00 70 17 48.909 N 148 35 10.065 W
-Poygon 3 63.00 308.28 -1508.06 5960553.00 674654.00 70 17 52.483 N 148 35 7.923 W
-Polygon 4 63.00 502.93 -2428.81 5960726.00 673729.00 70 17 54.395 N 148 35 34.765 W
-Polygon 5 63.00 740.51 -4113.81 5960924.00 672039.00 70 17 56.725 N 148 36 23.888 W
-Potygon 6 63.00 -152.11 -4057.71 5960033.00 672116.00 70 17 47.946 N 148 36 22.239 W
15-04B Fault 2 63.00 685.89 -2808.65 5960900.00 673345.00 70 17 56.194 N 148 35 45.840 W
-Polygon 1 63.00 685.89 -2808.65 5960900.00 673345.00 70 17 56.194 N 148 35 45.840 W
-Polygon 2 63.00 149.18 -2999.29 5960359.00 673167.00 70 17 50.914 N 148 35 51.391 W
15-046 Fault 3 63.00 817.06 -2472.46 5961039.00 673678.00 70 17 57.485 N 148 35 36.041 W
-Polygon 1 63.00 817.06 -2472.46 5961039.00 673678.00 70 17 57.485 N 148 35 36.041 W
-Polygon 2 63.00 89.91 -2604.55 5960309.00 673563.00 70 17 50.333 N 148 35 39.884 W
15-046 Fault 1 1 63.00 919.96 -4386.70 5961097.00 671762.00 70 17 58.488 N 148 36 31.846 W
-Polygon 1 63.00 919.96 -4386.70 5961097.00 671762.00 70 17 58.488 N 148 36 31.846 W
-Polygon 2 63.00 -48.27 -3964.25 5960139.00 672207.00 70 17 48.968 N 148 36 19.516 W
15-046 Fauft 4 63.00 -163.52 -4082.99 5960021.00 672091.00 70 17 47.834 N 148 36 22.975 W
-Poygon 1 63.00 -163.52 -4082.99 5960021.00 672091.00 70 17 47.834 N 148 36 22.975 W
-Polygon 2 63.00 -260.88 -3813.18 5959930.00 672363.00 70 17 46.878 N 148 36 15.109 W
by BP Alaska ~
Baker Hughes INTEQ Planning Report 1NTE
Q
Company: BP Amoco Date: 10/3/2007 Time: 11:17:30 ,Page: 2
Fietdc Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-04, True-North
Site: PB DS 15 Vertical (TVD) Reference: 4 :04 3/24/1982 00:00 83:0
Well: 15-04 Sectioe (VS) Reference. Well (O.OON,O.OOE,90.OOAzi)
Welipath: Plan 6, 15-048 SorveyCaknlatioq Method: Minimum Curvature Db: Oracle
Targets
Map Map ~- Latitude -~ ~. Loe~itnde ->
Name Description TVD +N!-S +E/-W Northing Easting Deb Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
15-046 Fault 6 63.00 -208.68 -3820.96 5959982.00 672354.00 70 17 47.391 N 148 36 15.337 W
-Polygon 1 63.00 -208.68 -3820.96 5959982.00 672354.00 70 17 47.391 N 148 36 15.337 W
-Polygon 2 63.00 -554.19 -3719.02 5959639.00 672464.00 70 17 43.993 N 148 36 12.361 W
15-046 Fauk 8 63.00 -296.11 -1457.20 5959950.00 674719.00 70 17 46.539 N 148 35 6.438 W
-Potygon 1 63.00 -296.11 -1457.20 5959950.00 674719.00 70 17 46.539 N 148 35 6.438 W
-Potygon 2 63.00 -824.30 -1115.47 5959430.00 675073.00 70 17 41.345 N 148 34 56.474 W
15-046 Fault 10 63.00 -304.99 -4150.33 5959878.00 672027.00 70 17 46.442 N 148 36 24.936 W
-Polygon 1 63.00 -304.99 -4150.33 5959878.00 672027.00 70 17 46.442 N 148 36 24.936 W
-Polygon 2 63.00 -739.74 -3698.36 5959454.00 672489.00 70 17 42.169 N 148 36 11.756 W
15-04B Fault 9 63.00 1400.96 -2715.85 5961617.00 673421.00 70 18 3.227 N 148 35 43.142 W
-Potygon 1 63.00 1400.96 -2715.85 5961617.00 673421.00 70 18 3.227 N 148 35 43.142 W
-Potygon 2 63.00 773.55 -2536.50 5960994.00 673615.00 70 17 57.057 N 148 35 37.907 W
15-046 Fault 7 63.00 -380.11 -2738.61 5959836.00 673440.00 70 17 45.710 N 148 35 43.787 W
-Polygon 1 63.00 -380.11 -2738.61 5959836.00 673440.00 70 17 45.710 N 148 35 43.787 W
-Polygon 2 63.00 -240.50 -2165.14 5959989.00 674010.00 70 17 47.085 N 148 35 27.073 W
15-04B Fault 5 63.00 535.42 -2235.98 5960763.00 673921.00 70 17 54.716 N 148 35 29.144 W
-Polygon 1 63.00 535.42 -2235.98 5960763.00 673921.00 70 17 54.716 N 148 35 29.144 W
-Polygon 2 63.00 653.06 -1835.09 5960890.00 674319.00 70 17 55.874 N 148 35 17.459 W
15-046 Target 4 8883.00 159.74 -1700.60 5960400.00 674465.00 70 17 51.022 N 148 35 13.535 W
15-046 Target 3 8913.00 358.27 -2701.29 5960575.00 673460.00 70 17 52.972 N 148 35 42.707 W
15-046 Target 2 8918.00 410.06 -2990.17 5960620.00 673170.00 70 17 53.480 N 148 35 51.128 W
15-046 Target 1 8928.00 230.69 -3659.60 5960425.00 672505.00 70 17 51.713 N 148 36 10.640 W
Annotation
MD TVD
ft ft
9800.00 8476.66 TIP / KOP
9820.00 8493.63 End of 9 Deg/100' DLS
10120.00 8775.60 3
10420.00 8923.89 4
10620.00 8928.13 End of 20 Deg/100' DLS
10800.00 8926.27 6
11360.00 8917.12 7
11590.00 8913.26 8
11940.00 8905.87 9
12350.00 8893.52 10
12650.00 8882.84 TD
Plan Section Information
Ml) Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg. deg ft ft ft deg/100ft deg/100ft deg/100ft deg
9800.00 32.86 276.10 8476.66 -112.82 -3940.51 0.00 0.00 0.00 0.00
9820.00 31.06 276.10 8493.63 -111.69 -3951.03 9.00 -9.00 0.00 180.00
10120.00 31.98 62.10 8775.60 -61.63 -3958.47 20.00 0.31 48.67 160.00
10420.00 87.23 32.28 8923.89 119.04 -3792.83 20.00 18.42 -9,94 325.00
10620.00 90.44 72.16 8928.13 239.04 -3637.96 20.00 1.61 19.94 86.00
10800.00 90.73 54.16 8926.27 319.96 -3478.01 10.00 0.16 -10,00 271.00
11360.00 90.99 110.17 8917,12 393.29 -2 945.14 10.00 0.05 10,00 89.30
11590.00 90.91 87.17 8913.26 358.86 -2 719.32 10.00 -0.03 -10.00 270.00
11940.00 91.43 122.17 8905.87 271.64 -2 386.04 10.00 0.15 10.00 88.80
12350.00 91.87 81.15 8893.52 190.54 -1 993.21 10.00 0.11 -10.00 271.20
by BP Alaska
Baker Hughes INTEQ Planning Report
~il~
s
INTEQ
Company: BP Amoco Date: 10/3/2007 Time: 11:17:30 Page: 3
Field: Prudhoe Bay Co-ordiuatc(NE) Reference: WeN: 15-04, True North
Site: PB DS 15 VerticAl (TVD) Reference: 4:04:3/24/198700:00 63.0
Well: 15-04 Section (VS) Refere®ce: Weq (O.OON,O.OOE,90.OOAzi)
VYellpath: Plan 6, 15-04 6 Survey Cakvlatiou Method: Minimum Curvature Db: Orade
Plan Section Information
MD - Iuel Azon TVD +N/-S +E/-W DLS Band' Tura 'TFO Tarset
ft deg deg. ft ft ft deg/100ft deg1100ft deg/100ft deg..
12650.00 92.12 111.17 8882.84 158.72 -1698.53 10.00 0.08 10.01 89.00
Survey
MD Intl Azim SS TVD N/S ENVY MapN MapE DLS VS TFO ' Tool
ft deg.. deg. ft ft ft ft ft deg/100ft ft deg
9800.00 32.86 276.10 8413.66 -112.82 -3940.51 5960075.03 672232.25 0.00 -3940.51 0.00 MVVD
9820.00 31.06 276.10 8430.63 -111.69 -3951.03 5960075.90 672221.70 9.00 -3951.03 180.00 MVVD
9900.00 16.85 295.08 8503.65 -104.54 -3982.26 5960082.33 672190.31 20.00 -3982.26 160.00 MVVD
10000.00 12.04 21.58 8601.40 -88.53 -3991.65 5960098.11 672180.55 20.00 -3991.65 142.50 MVVD
10100.00 28.24 59.28 8695.30 -66.52 -3967.22 5960120.68 672204.45 20.00 -3967.22 57.78 MWD
10120.00 31.98 62.10 8712.60 X1.63 -3958.47 5960125.78 672213.09 20.00 -3958.47 21.90 MWD
10200.00 45.91 49.38 8774,77 -32.82 -3917.67 5960155.53 672253.20 20.00 -3917.67 325.00 MWD
10275.00 59.76 42.10 8820.00 8.99 -3875.26 5960198.32 672294.61 20.00 -3875.26 334.98 15-04B
10300.00 64.46 40.16 8831.69 25.63 -3860.74 5960215.30 672308.74 20.00 -3860.74 339.41 MWD
10400.00 83.42 33.50 8859.26 102.31 -3803.65 5960293.29 672364.01 20.00 -3803.65 340.32 MWD
10420.00 87.23 32.28 8860.89 119.04 -3792.83 5960310.27 672374.44 20.00 -3792.83 342.19 MWD
10500.00 88.44 48.24 8863.94 179.85 -3741.33 5960372.26 672424.50 20.00 -3741.33 86.00 MWD
10600.00 90.10 68.18 8865.22 232.25 -3656.77 5960426.63 672507.80 20.00 -3656.77 85.39 MVVD
10620.00 90.44 72.16 8865.13 239.04 -3637.96 5960433.85 672526.45 20.00 -3637.96 85.14 MWD
10700.00 90.58 64.16 8864.41 268.77 -3563.76 5960465.32 672599.92 10.00 -3563.76 271.00 MVVD
10800.00 90.73 54.16 8863.27 319.96 -3478.01 5960518.50 672684.44 10.00 -3478.01 270.93 MWD
10900.00 90.84 64.16 8861.89 371.15 -3392.27 5960571.68 672768.96 10.00 -3392.27 89.30 MWD
11000.00 90.93 74.16 8860.35 406.67 -3298.94 5960609.38 672861.42 10.00 -3298.94 89.44 MWD
11100.00 90.98 84.17 8858.68 425.44 -3200.86 5960630.44 672959.03 10.00 -3200.86 89.59 MWD
11200.00 91.01 94.17 8856.93 426.90 -3101.01 5960634.24 673058.81 10.00 -3101.01 89.76 MVVD
11300.00 91.01 104.17 8855.17 410.99 -3002.43 5960620.64 673157.73 10.00 -3002.43 89.93 MWD
11360.00 90.99 110.17 8854.12 393.29 -2945.14 5960604.29 673215.41 10.00 -2945.14 90.11 MWD
11400.00 90.99 106.17 8853.43 380.82 -2907.14 5960592.72 673253.69 10.00 -2907.14 270.00 MIND
11500.00 90.96 96.17 8851.73 361.48 -2809.18 5960575.68 673352.07 10.00 -2809.18 269.93 MWD
11590.00 90.91 87.17 8850.26 358.86 -2719.32 5960575.17 673441.96 10.00 -2719.32 269.76 MWD
11600.00 90.93 88.17 8850.10 359.27 -2709.33 5960575.81 673451.94 10.00 -2709.33 88.80 MVVD
11700.00 91.12 98.17 8848.30 353.76 -2609.62 5960572.64 673551.74 10.00 -2609.62 88.82 MWD
11800.00 91.28 108.17 8846.20 331.01 -2512.40 5960552.18 673649.47 10.00 -2512.40 89.00 MWD
11900.00 91.40 118.17 8843.86 291.73 -2420.60 5960515.06 673742.15 10.00 -2420.60 89.21 MWD
11940.00 91.43 122.17 8842.87 271.64 -2386.04 5960495.79 673777.17 10.00 -2386.04 89.44 MWD
12000.00 91.55 116.17 8841.30 242.42 -2333.69 5960467.80 673830.19 10.00 -2333.69 271.20 MWD
12100.00 91.71 106.17 8838.45 206.37 -2240.59 5960433.95 673924.10 10.00 -2240.59 271.04 MVVD
12200.00 91.81 96.16 8835.37 187.04 -2142.66 5960416.92 674022.45 10.00 -2142.66 270.76 MWD
12300.00 91.87 86.16 8832.15 185.02 -2042.86 5960417.24 674122.27 10.00 -2042.86 270.45 MWD
12350.00 91.87 81.15 8830.52 190.54 -1993.21 5960423.92 674171.77 10.00 -1993.21 270.13 MWD
12400.00 91.95 86.16 8828.85 196.06 -1943.56 5960430.61 674221.28 10.00 -1943.56 89.00 MVVD
12500.00 92.06 96.16 8825.34 194.04 -1843.76 5960430.93 674321.08 10.00 -1843.76 89.17 MVVD
12600.00 92.12 106.17 8821.68 174.71 -1745.85 5960413.90 674419.42 10.00 -1745.85 89.52 MVVD
12650.00 92.12 111.17 8819.84 158.72 -1698.53 5960399.03 674467.10 10.00 -1698.53 89.88 2 3/8"
•
by
BP Alaska
Anticollision Report
~.r
s
INTEQ
Company: BP Amoco Date: 10!312007 Tim e: 11:24::08 Page: I
field: Prodhoe Bay
Reference Site: PB DS 15 Co-ordmate(NE) Reference: WeN: 15-tk, True-North
Reference We1L 15-04 Vertkal (TVD) Reference: 4:04 3/24/198700:00 63.0
Reference Welipathc Plan 6 15-04B' Db: Grade
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There are'~f~aeells in this91dld5pal Plan & PLANNED PROGRAM
Interpolation Method: MD Interval: 100.00 ft Error Model: ISCWSA Ellipse
Depth Range: 9800.00 to 12650.00 ft Scan Method: Trav Cylinder North
Maximum Radius: 2500.00 ft Error Surface: Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 9/25/2007 Validated: No Version: 0
Planned From To Survey Tookode Tool Name
ft ft
50.00 9800.00 Gyro (50.00-10314.50) (0) BOSS-GYRO Sperry-Sun BOSS gyro multishot -Used in Preferen
9800.00 12650.00 Planned: Plan #6 V9 MWD MWD -Standard
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
12650.00 8882.84 2.375 3.000 2 3/8"
Summary
Offset Wellpath ~ Reference .Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft„
15-04,PIan 6, 15-048,P 12400.00 12400.00 0.00 662.74 -662.74 FAIL: Major Risk
PB DS 15 15-01 15-01 V4 Out of range
PB DS 15 15-01 15-01A V2 Out of range
PB DS 15 15-01 15-01 B V6 Out of range
PB DS 15 15-02 15-02 V2 Out of range
PB DS 15 15-02 15-02A V7 10000.00 12390.00 1493.95 636.82 857.12 Pass: Major Risk
PB DS 15 15-02 15-02APB1 V6 Out of range
PB DS 15 15-02 15-026 V14 10025.00 12600.00 1081.53 535.13 546.39 Pass: Major Risk
PB DS 15 15-02 15-026P61 V19 9953.50 11032.50 2246.43 689.48 1556.95 Pass: Major Risk
PB DS 15 15-02 15-02BPB2 V22 10018.43 11079.50 2322.92 683.71 1639.21 Pass: Major Risk
PB DS 15 15-03 15-03 V1 Out of range
PB DS 15 15-04 15-04 V5 9800.00 9800.00 0.00 716.06 -716.06 FAIL: Major Risk
PB DS 15 15-04 15-04A V2 9800.00 9800.00 0.00 716.06 -716.06 FAIL: Major Risk
PB DS 15 15-05 15-05 V5 11100.00 9800.00 1749.30 1308.25 441.05 Pass: Major Risk
PB DS 15 15-05 15-05A V2 11100.00 9800.00 1749.301308.25 441.05 Pass: Major Risk
PB DS 15 15-05 15-05AP61 V2 11100.00 9800.00 1749.30 1308.25 441.05 Pass: Major Risk
PB DS 15 15-06 15-06 V1 12500.00 9000.00 2241.23 848.66 1392.57 Pass: Major Risk
PB DS 15 15-O6A 15-O6A V4 12550.00 11288.00 611.04 895.70 -284.66 FAIL: Major Risk
PB DS 15 15-O6AP61 15-O6AP61 V2 12550.00 10660.00 1138.91 895.69 243.23 Pass: Major Risk
PB DS 15 15-16 15-16 V5 Out of range
PB DS 15 15-16 15-16A V3 Out of range
PB DS 15 15-17 15-17 V4 Out of range
PB DS 15 15-19 15-19 V2 Out of range
PB DS 15 15-19 15-19A V2 Out of range
PB DS 15 15-20 15-20A V6 Out of range
PB DS 15 15-23 15-23 V1 12300.00 9400.00 1075.15 716.83 358.32 Pass: Major Risk
PB DS 15 15-23 15-23A V4 10115.56 11100.00 643.96 670.59 -26.64 FAIL: Major Risk
PB DS 15 15-24 15-24 V1 Out of range
PB DS 15 15-26 15-26 V1 12524.18 9700.00 524.20 711.45 -187.25 FAIL: Major Risk
PB DS 15 15-26 15-26A V3 12524.18 9700.00 524.20 711.34 -187.14 FAIL: Major Risk
PB DS 15 15-26 15-26B V5 12524.18 9700.00 524.20 712.13 -187.93 FAIL: Major Risk
PB DS 15 15-41 151 V1 Out of range
PB DS 15 15-41 15-41A V2 Out of range
PB DS 15 15-41 15-41 B V3 Out of range
PB DS 15 15-41 15-41 BP61 V1 Out of range
PB DS 15 15-41 PlarWt315-41 A VO Plan: Out of range
PB DS 15 15-47 15-47 V1 Out of range
PB DS 15 15-48 15-48 V1 11053.87 11386.30 224.27 761.15 -536.88 FAIL: Major Risk
PB DS 15 15-48 15-48A V2 12300.00 10000.00 632.97 726.09 -93.12 FAIL: Major Risk
PB DS 15 15-48 15-486 V4 Out of range
are
i
~_
.- .- BAG
Dowell
Blind/Shears
TOTs
of pipes 2" combi pipe/slips
~ ~ Mud Cross I I Mud Cross
le of flow cross
of blind/shears 2 3/8" combi pipe/slip
TOTs
2" combi pipe/slips
Swab Valve
Flow Tee
Alaska Department of Natural Resources Land Administration System Page 1 of 2
•
.~ i ~ . a~r..~~c~~. , ' ,_a r~~ ~~s~~~9.., .~ ~,,,arc~ State Cabins a 4J +~ ~ _ ~~
+~SC ~~~ ~
t.A Men! I Case Abstract I Case Detail I Land Abstract
_.
bile: ~U1. 2830G '~''' Search for ~~.3~:~as_P[at UpcEates
AS of r0~~ i ~?I~o;
C'zislomer: 000107377 BP EXPLORATION (ALASKA) INC
PO BOX 1 966 1 2/900 E. BENSON 13L ATTN: LAND MANAGER-
ALASKA
ANCHORAGE AK 995 1 966 1 2
Case Tyre: ~~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS
Filc Locution: DOG DIV OIL AND GAS
Case Slutz~s: 35 ISS/APPRV/ACTV/ AUTH Status Dute: 09/l4/1965
Tot«I <~cres: 2560.000 Dale Initiated: 05/28/1965
Office of Primary Responsibility: DOG DEV O IL AND GAS
Lass 7runsuction Date: 12/04/2006 Case Subtti=pe: ~~~ NORTH SLOPE
Iast Trujrsaction: AA-NRB ASSIGNMENT APP ROVED
~l>(ef•1«'rarr: U 'Totivnship: 011N Runge: 014E Sec°tion: 1~ Section Acres: 640 Se~reh
;arms
~7erldlaJl: ~1 towns/11p: ~~ ~ I ~ RCrnge: 014E .JeC~ilon. 16 Sec'U(~ll . I~J'CS': 640
Illeridian: tl Toit~u~liri~: ti l I N Range: 014E. Section: 21 Section flrr<~,: ti40
~l-Ieridiat~: U Totia~ir~hr~~ t) I I ~ Range: 014E ,Section: ?2 Se~•tioyt 1V cr~~s: (i40
Legal llescription
0 ~ -?8-196 * ~~ *S-1L1; NOTICE LECr,~ I DESCRIPTIONS * ~`
CI-1-1?' I1,V 1-1E t 1I1~,16.21,2? 2(0.00 ti- ~-
_1
Last updated on 10/11/2007.
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28306... 10/11 /2007
Alaska Department of Natural Resources Land Administration System Page 2 of 2
Not sure who to contact? Have a question about DNR? Visit the Pudic Zri~c~rr~a~crn tenter.
Report technical problems with this page to the V~Jet~~ser.
Site optimized for Netscape 7, IE 6 or above.
This site also requires that all {~fCIE a must be accepted.
State of Aiaska Naturai F2esources LAS Home Copyright Privacy System Sta#us
__
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28306... 10/ 11 /2007
•
TRANSMITTAL LETTER CHECKLIST
WELL NAME ~~~ ~~S'-O~~
PTD# o~D~f~~
/ Development Service Exploratory Stratigraphic Test
Non-Conventional Well
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS TEXT FOR APPROVAL LETTER
WHAT (OPTIONS)
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well
(If last two digits in permit No.
API No. 50- - -
API number are ,
between 60-69) Production should continue to be reported as a function of the
original API number stated above.
PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name ( PH) and API number
(50- - -_) from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTION 25.055. Approval to perforate and produce /inject is contingent
upon issuance of a conservation order approving a spacing
exception. , assumes the
liability of any protest to the spacing exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
through target zones.
Please note the following special condition of this permit:
Non-Conventional production or production testing of coal bed methane is not allowed
Well for (name of welly until after (Company NameZhas designed and
implemented a water well testing program to provide baseline data
on water quality and quantity. (Company Name) must contact the
Commission to obtain advance approval of such water well testing
ro ram.
Rev: 7/13/ZO07
•
^^
, ,
m o ,
o ~
o ~
~
c ,
,
,
c 3, ~ E
~' ~'
o, ~~ ~ ~ ~ ~ ~ ~~
N
° ~
°
~ r ~ r ,
w ~ ~ ~
¢' C
E O ~ o ~ w, ,
~
o
~ ~ 4
co N,
_
,
4 I N• o' ao, ~
.
~ d ~
N'
c,
c
~ ; ; ~ ~ ~
g, o
, c. ;
~ ~
'
, c. m, q N
[0 ~ ~ o o- ~1 ~ Y a
o
~ •Q
~ ~, W' d'
~ ~ O
L
O O
Z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N, " ~
~ N, ~ 3. ~ 7. ~.
Q
O ~ v O' ~, v '~ U. M
2 m m, o, ~ c ~ o, a ~, ~, ~, N a'
ar
U C m X I ~
m C7 m, o ~ o, a '6 x o. ~ m m ~ ~:
~ ~ ~ ~ ~ ~ f6. ~ ~ ~ ~ O• O,
• O. ~ ~ OI ~~ O, O• m. ¢~ ~ ~
• m,
Z 7 N
' ' ' ~ ' 'k
d z, r, ~, }, ~
, ~
, ~-, ~-, ~-, }; }; } } z, z;
, z z z z z ~ ~-, ~- z, ~ ~ }. }
~-
~- } r z z z, z z ~- /
-
T , , ,
, ~
m ~ ~~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ f ~ ~ ~ 1
~ ~ ~ ~ ~ ~ ~ ; ~
v ~
a ;
y c. _
m. m. ,
- E. a~ I
, ~ ~
•
~ ~
.~
a~
~
O fl- c, t, o. d E
,n ~ ~
~ ~ ~
~ ~ ~
~ ~
~ ~
~ ~
~ ~~ o, a ~ ~ ~ ~~ ~~ ~~ ~~ ~ ~~ a~, ~~ ~~ ~~ ~~ x U
o
~,
~
~ 3. ~~
, 3. ~ ~ ~ ~ o,
'
~ N, ti' Q'
N rn o ~: t
~
O
~
~
~
~
C,
~
~
j.
O
G O, N~
~
~
U
~
~
~
i
Q ~ (O. U, ~
m
~
~ ~~
f
~
~
~ ~ ~ !
`
.~0.. \
Q
,
~ O,
~: ~
~ ~
~
~,
' ,
d
O T
C~
~~ -O: O. Q,
'
, ~ ~
O~ ty/~ ~
~ rn
~~ ~ ~ a
~ ~
C. ~ N• O C•
N
' ~ ~ .a,
~ ~ N, ( ~
m.
N ~ ~ N,
~ ~ 'C, Q~
d
~
~ 'C~
y
~
O~
p.
r
~
-O~ N.
~~ ~
N, ~ O~
~~ U:
~ ~ `C~
~
~~
~~ ~
~ ~
~ ~~
y~ W~
m
~~
d T
~ ~ ~:
~,
N.
~,
C•
O.
~ O~ "mil
~ ~ ~ ~.
• ~
,
.
a , ~ .
N
N ~ ~
} ~ 3~ +' i 00,
' y
N ~
T .O
0' O
N;
'O a O ~ N U. N
~
O ,N.
~ N ~ c O.
Q ~
• 3~ ~ ~.: a, ~~ ~ N,
¢ V ~ ~ ~ ~ C. ~, j.
~ ~~ . ,
~, ~ ~ ~ O' ~ ~ ~, ~:
m~ .4 O M' ~~ ~ O• 3: N, N ~ N'
[~ Z
W _
~
~ ~ ~ ._~
~ -a. ~,
o~ ~
c. ~, ~
~ o Z~
m~ N•
,c~ m
v ~ 3, N, ~~
a>, d .~ ~
~ ~~ C• O~
~ c.
~~ L
m~ ~
m, ~ C, y: ]~ ~ i0~
o. o ~
, ~ ~ ~, 7' ~ ¢'
~ ~ y' N'
, N' N aS
c ~ `~
O
~
~ ~,
~,
-, "6,
C
C
E
~ .
m, N O M' ~
C' c uj
H' m
C O a2S~ ~~ ~; ~
c
C O „L_,~
~ ~
fl' o
N~ O:
C C
1
(n Qj ~i' ,~ C U' ~ ¢~
N
O ~
U.. .N
_' >~ m' ~' N •tn
g O,
~ O, •~ C,
O ~
O ~
7 ~ .
, ~
O'
'D m ~ ~ C
Y ~, COQ ~, , N• m O
01 ~~ m, •~~ m, ¢:
• N: ~: N~ T O, Y
p~ O, N• C y
a' ~ ~
°~ O,
~, d ~, o ~,
m T
~ ~, a o, m Y
c' m,
'~
~ ~
Z, o' .r ~: ~ 3:
m ~ o ~ t ~
~ 3' ~, a~
~- 3
0. ~ ¢ ~ ~
m.
' ~, ~ ~:
c, ~~ ~,
.
~
, d m m,
d r~
~ .c: ~
v m~ m. ~~
a. E.
~ v~
a~, `
m• L~ .
' c ay ~:
' ~-~
, •-~ ~, ~ o o:
M. m. ~
°'' o d 3'
' o' ~
' .
o~
>,
m'
' m
w o
o z
O a m in,
~ vi
v _ ~, 3
, 3, a> ~~ ~_: ..~ v ~'
'v. ~. 3 m
~' o q a~ cr d . 'n
0 3. a~ m o ~
°
a o ,
c, ~.
m m . >,
m
°~ ~,
o v,
o a,
m
°
m~ ~~ °~ o,
~ °
~ $~ o.
Y,
a~i~ o
o~ y, a~ ~~ ~~ m~ ~~
~ rn o,
f ~~
d
y~ ~~ ~~
a
~ ,
°~ a
d m, ~~ Q. Q. ~
d v.
m i ~~ n ~~ ~
oi~ u °~ ~~ ~~ ~~ - -° m ~ ~' -d m' ~~ m o~ ~~ ... I
• c~ c' a o,
°tS
~° Q v,
m m. E. ~ o,
~ o, a1 aY
~ 3' d
~' q
m i,
v
m, ti m a
~; ~; •c, o;
~ ~ vi
~ d ca ~o m m' ~ m' o' ~ ay ~ c v.
~~ •
°~
~
~ 3 2. ~°
~ o ~ N'
~ o'
~ m' o, s
~ -~
m~ ~,
a, ~~ .~
a
, v. a. a
a: ~
v. ~~', ~
v' m,
n. m~
n~ a~
n 3, S rn
v: ~, ~, ~ ~ 'c
y~ ~ m ~
a~~ a~. ~~
>, c. Y,
~ c ~~
~
~
o
~ ~
t, m °` °' w
~
m ° v ' m~
~ ~
~ >,
~°
ar E, _
m, -d o. r. c. c. ~ ~
' m.
' . ~
_. o' '~
' o. m.
~ c: a~ c
X ~ ~, m m. io m: m. m E m. 3
~ °~ o ~ m m
° ~ °~ ~ =, aj, ~, v ~ m _
v m ~ co ~ ~
~ a ~ a>; ~,
°'
-°: -°' >'
m-
~
~ ~
; o , a o
°' a ~' >'
~~ °~ 3~ m ~~ ~' m' ~' w~ w~ ~ 3'
`~
~ r~ ~ °' ; ~' m'
• i
~
_
, ~
~
c
i ~
~ _ ~
3 ~ d~,
~ a
i
o
~ ~ ~
E 1
u
Y m ~ ami .c ~' ~' ~' 7, o a a ~' ~' ~ ~
, ~ o o ~ ~, ~ ~, m, ~ ~ ~ ~ O
O ~ ' °: a
i a`
i m; '~: m o ~ ~.
v ~ a, ~, ~, S, ~, ~, cn, ~, O, O, a, a, v ~, ¢, n., z v. ~, v, v, v: v, ¢,
_
~, ¢, o' m. m, v, ~: ~'; ~ ~ o, ~ ~, v o
w d ..~
O N M 'cY LL) O n W _
O O N M V _
to (O 1~ W O O N M 'V ~ (D I~ W O
O ~
_ N
- M rl' t0
__ (O 1~ W O) r
~ ~
~ N N N N N N
N N N N M M M M M M M M M M
U __ _
_. _-_ ___ ._.
~ C.1 ~ I ~ O
C
r O
N O O
w N O
w N N
U c
~ O Q ~ Q ~ ~ ~~ 01 0 I
w
i
o
C
•
o~
i
o N
p~ v!
O
a y ~ ~ ~ ~ ~ F--
N
J ~ N ~ ~ N U
o
?
a s a ¢ ` aW ~ a¢
s w c
Well History File
APPENDIX
•
Information of detailed nature that is not
particufariy germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify Tending infom~ation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this calegory of information.
**** REEL HEADER ****
MWD
08/03/18
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/12/25
1718748
O1
3" CTK
*** LIS COMMENT RECORD ***
Iliiiiiiii iiiiiiii! Remark File Version 1.000
iiiiiiiiii iiiiiiiii Extract File: ldwg.las
Version I nformation
VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
Well Info rmation Block
#MNEM.UNIT Data Type Information
STRT.FT 9568.0000: Starting Depth
STOP.FT 12865.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: 15-04B
FLD FIELD: Prudhoe Bay Unit
LOC LOCATION: 70 deg 17' 49.453"N 148 deg 34' 23.963"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 2.375" CTK
DATE. LOG DATE: 25 Dec 2007
API API NUMBER: 50029207260200
Parameter Information Block
#MNEM.UNIT Value Description
SECT. 22 Section
TOWN.N T11N Township
RANG. R14E Range
PDAT. MSL Permanent Datum
EPD .F 0 Elevation Of Perm. Datum
LMF DF Log Measured from
FAPD.F 63 Feet Above Perm. Datum
DMF RF Drilling Measured From
EKB .F 0 Elevation of Kelly Bushing
EDF .F 63 Elevation of Derrick Floor
EGL .F 0 Elevation of Ground Level
CASE.F N/A Casing Depth
OS1 DIRECTIONAL Other Services Line 1
Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
~ ~ ~ ~ ~~_
~~
C~
(2) All depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (SSTVD) are Subsea corrected.
(4) All Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer Downhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to PDCL
(Primary
Depth Control Log) provided by Schlumberger dated 28 Dec 2007.
(8) Tied to 15-04 at 9600 feet MD (8414 ft. TVDSS)
(9) The sidetrack 15-04B was drilled off a permanent whipstock set at
9806 feet MD
(8419 feet TVDSS) through a milled window in 4 1/2 inch and 7 inch
liner.
Top of window 9808 ft.MD (8420 ft.TVDSS)
Bottom of window 9816 ft.MD (8427 ft.TVDSS)
(10) Baker Hughes INTEQ runs 3 and 4 were used to drill 15-04B PB1.
(11) No footage was drilled on run 5. Decision to sidetrack was made
while tripping in
the hole.
(12) Baker Hughes INTEQ run 6 was utilized to open hole sidetrack at
10240 feet MD (8792 feet TVDSS).
(13) The interval from 12835 feet to 12865 feet MD (8820 feet to 8818
feet TVDSS) was not logged
due to sensor to bit offset at well TD.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP_AVG -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
9589.44, 9590.06, ! 0.62207
9599.6, 9599.81, ! 0.207031
9601.05, 9601.67, ! 0.621094
9603.95, 9603.33, ! -0.621094
9605.82, 9604.78, ! -1.03711
9608.1, 9606.86, ! -1.24414
9610.38, 9610.38, ! 0
9618.26, 9618.88, ! 0.62207
9624.06, 9625.51, ! 1.45117
9627.79, 9629.66, ! 1.86523
9640.23, 9641.06, ! 0.829102
9646.03, 9645.62, ! -0.414062
9648.73, 9648.11, ! -0.62207
9650.8, 9650.59, ! -0.208008
9803.43, 9803.22, ! -0.207031
9810.48, 9808.2, ! -2.28027
9811.72, 9811.93, ! 0.207031
9813.17, 9813.38, ! 0.207031
9814.62, 9815.87, ! 1.24316
9818.15, 9817.94, ! -0.207031
9824.16, 9824.16, ! 0
9825.82, 9826.44, ! 0.62207
9830.38, 9830.38, ! 0
9835.56, 9835.35, ! -0.207031
9837.84, 9838.25, ! 0.415039
9840.33, 9841.36, ! 1.03711
9842.61, 9843.44, ! 0.829102
9844.98, 9844.98, ! 0
9846.22, 9847.26, ! 1.03711
9850.99, 9851.82, ! 0.829102
9860.73, 9861.35, ! 0.62207
9863.43, 9863.63,
9865.29, 9865.5,
9866.95, 9868.2,
9874.21, 9874, !
9877.52, 9876.49,
9878.97, 9878.15,
9881.88, 9881.46,
9883.74, 9883.95,
9889.8, 9889.8,
9892.08, 9893.32,
9895.19, 9896.84,
9897.47, 9898.5,
9903.89, 9902.44,
9905.14, 9905.76,
9907.62, 9907.42,
9909.07, 9909.07,
9910.53, 9910.73,
9914.05, 9914.05,
9916.33, 9916.33,
9918.2, 9918.61,
9920.89, 9920.89,
9924.41, 9924.21,
9925.66, 9926.9,
9926.9, 9928.35,
9930.01, 9930.84,
9933.12, 9933.95,
9938.5, 9937.47,
9939.75, 9939.54,
9940.78, 9941.82,
9943.06, 9943.48,
9944.31, 9945.76,
9950.32, 9949.49,
9960.06, 9961.72,
9970.01, 9968.77,
9979.13, 9979.96,
9990, 9989.17, !
9993.73, 9992.91,
9997.26, 9997.47,
10002.6, 10002.4,
10003.7, 10004.7,
10008.5, 10008.2,
10010.5, 10010.7,
10017.4, 10017.2,
10019.6, 10019.6,
10022.5, 10024,
10025, 10026.1,
10028.8, 10029.2,
10030.2, 10031,
10032.5, 10033.5,
10036, 10036.2,
10038.3, 10038.3,
10041.8, 10042.7,
10047.7, 10047.7,
10049, 10048.3,
10051.2, 10050.8,
10051.9, 10052.3,
10052.5, 10053.3,
10056, 10056.2,
10058.5, 10059.5,
10060.4, 10061.2,
10062, 10062.2,
10064.1, 10064.1,
10065.1, 10066.4,
10067.6, 10068.2,
10069.1, 10069.9,
10071.6, 10071.1,
10073.2, 10072.8,
0.207031
0.208008
1.24316
-0.207031
-1.03613
-0.829102
-0.414062
0.207031
0
1.24414
1.6582
1.03613
-1.45117
0.62207
-0.207031
0
0.207031
0
0
0.415039
0
-0.207031
1.24414
1.45117
0.829102
0.829102
-1.03613
-0.207031
1.03711
0.415039
1.45117
-0.829102
1.6582
-1.24414
0.829102
-0.829102
-0.829102
0.207031
-0.207031
1.03711
-0.207031
0.207031
-0.207031
0
1.45117
1.03711
0.415039
0.829102
1.03613
0.207031
0
0.829102
0
-0.62207
-0.415039
0.414062
0.829102
0.207031
1.03711
0.829102
0.207031
0
1.24414
0.62207
0.829102
-0.415039
-0.415039
10074.9, 10075.3, ! 0.414062
10077.8, 10078, ! 0.207031
10083.8, 10082.8, ! -1.03711
10089.6, 10088.8, ! -0.829102
10092.5, 10091.5, ! -1.03613
10093.7, 10095.2, ! 1.4502
10104.1, 10103.3, ! -0.829102
10105.8, 10105.8, ! 0
10109.8, 10109.6, ! -0.207031
10116, 10115.2, ! -0.829102
10120.4, 10120.4, ! 0
10121.8, 10121.8, ! 0
10123.9, 10124.3, ! 0.414062
10131.4, 10131.6, ! 0.208008
10155.3, 10155.1, ! -0.207031
10157.2, 10157, ! -0.207031
10159.3, 10159.7, ! 0.414062
10162.4, 10161.1, ! -1.24414
10164, 10165.1, ! 1.03613
10166.5, 10168.2, ! 1.6582
10169.9, 10170.9, ! 1.03711
10174, 10174, ! 0
10177.1, 10176.9, ! -0.207031
10180.6, 10180, ! -0.62207
10183.1, 10183.3, ! 0.208008
10185.8, 10185.8, ! 0
10188.9, 10189.7, ! 0.829102
10192, 10193, ! 1.03613
10195.5, 10194.7, ! -0.829102
10197.6, 10198, ! 0.415039
10200.9, 10201.7, ! 0.829102
10203.2, 10203.4, ! 0.207031
10221.9, 10220.9, ! -1.03711
10224.4, 10224, ! -0.415039
10226.3, 10225.9, ! -0.414062
10235.2, 10233.7, ! -1.45117
10236.6, 10237.1, ! 0.415039
10238.3, 10238.9, ! 0.62207
10239.5, 10240, ! 0.414062
10242.4, 10242.9, ! 0.414062
10244.5, 10244.3, ! -0.207031
10248, 10246.8, ! -1.24414
10250.9, 10249.7, ! -1.24414
10252.6, 10252.6, ! 0
10254, 10254.3, ! 0.207031
10256.3, 10257, ! 0.62207
10258.6, 10259.4, ! 0.829102
10261.9, 10261.1, ! -0.829102
10268.1, 10268.6, ! 0.415039
10271.5, 10271.5, ! 0
10272.9, 10274.4, ! 1.45117
10283.7, 10281.6, ! -2.07227
10284.9, 10283.9, ! -1.03613
10288.2, 10287.6, ! -0.62207
10295.9, 10293.8, ! -2.07324
10297.9, 10296.9, ! -1.03711
10300.2, 10298,6, ! -1.65918
10302.7, 10301.2, ! -1.45117
10304.6, 10303.5, ! -1.03613
10307.1, 10306,4, ! -0.62207
10308.9, 10308,3, ! -0.62207
10310, 10309.3, ! -0.621094
10312.4, 10311.8, ! -0.62207
10315.1, 10314.1, ! -1.03613
10316.6, 10315.8, ! -0.829102
10319.1, 10318, ! -1.03613
10322.6, 10321.1, ! -1.45117
10327.6, 10326.1,
10330.5, 10329.2,
10333.4, 10332.5,
10336.9, 10335,
10339.2, 10337.3,
10342.9, 10341,
10345.4, 10343.3,
10347.7, 10345,
10350, 10347.3,
10350.8, 10348.9,
10353.3, 10351,
10354.5, 10352.6,
10355.8, 10354.3,
10357.4, 10355.1,
10360.1, 10358.5,
10362.8, 10361.1,
10365.9, 10364,
10368.6, 10366.1,
10370.7, 10368,
10373.2, 10370.9,
10375.2, 10373.2,
10377.9, 10375.5,
10379.2, 10377.7,
10384.1, 10382.6,
10387, 10384.7,
10388.5, 10387,
10392, 10390.1,
10394.7, 10393.2,
10396.7, 10395.1,
10400.3, 10400.7,
10405, 10405.2,
10407.9, 10407.1,
10411.9, 10409.6,
10413.3, 10411.5,
10416.6, 10414.8,
10423.9, 10420.2,
10425.4, 10422.9,
10428.7, 10426.4,
10432.4, 10429.5,
10434.5, 10431.8,
10437.4, 10434,
10441.1, 10437,
10442.5, 10439.6,
10447.1, 10444.4,
10450.2, 10447.3,
10453.3, 10451,
10456.2, 10452.7,
10456.9, 10454.2,
10460, 10457.5,
10461.8, 10459.1,
10466, 10462.9,
10469.6, 10465.9,
10472.9, 10470.8,
10478.9, 10477.3,
10483.3, 10481.2,
10495.3, 10489.9,
10498.8, 10494.9,
10501.1, 10497.6,
10506.1, 10501.7,
10508.1, 10504.2,
10513.5, 10507.5,
10515.6, 10511,
10517.3, 10514,
10520.2, 10516,
10523.3, 10519.7,
10526, 10522.4,
10530.1, 10526.6,
-1.4502
-1.24414
-0.829102
-1.86523
-1.86523
-1.86523
-2.07227
-2.69434
-2.69434
-1.86523
-2.28027
-1.86523
-1.45117
-2.28027
-1.65918
-1.6582
-1.86523
-2.4873
-2.69434
-2.28027
-2.07227
-2.4873
-1.45117
-1.45117
-2.28027
-1.4502
-1.86523
-1.45117
-1.6582
0.414062
0.207031
-0.829102
-2.28027
-1.86523
-1.86523
-3.73145
-2.48828
-2.28027
-2.90234
-2.69434
-3.31641
-4.14551
-2.90234
-2.69531
-2.90234
-2.28027
-3.52441
-2.69531
-2.48828
-2.69434
-3.11035
-3.73145
-2.07324
-1.6582
-2.07324
-5.38965
-3.93848
-3.52441
-4.35352
-3.93848
-6.01172
-4.56055
-3.31641
-4.14551
-3.52441
-3.52344
-3.52441
10532, 10528.5,
10534.7, 10531.1,
10537.8, 10534,
10540.6, 10537.3,
10541.9, 10539.2,
10546.4, 10542.7,
10550.8, 10547.5,
10555.3, 10552.6,
10557, 10554.9,
10560.5, 10557.6,
10563.4, 10560.5,
10568.2, 10564,
10572.5, 10569.9,
10576.7, 10574.4,
10581.3, 10576.7,
10582.9, 10579.8,
10586.4, 10582.7,
10587.9, 10585.2,
10593.9, 10590,
10597.3, 10594.4,
10600, 10597.1,
10603.7, 10600.6,
10606.4, 10603.1,
10608.2, 10604.1,
10610.3, 10606.4,
10612.8, 10609.5,
10615.9, 10612.8,
10619.2, 10616.5,
10624.4, 10619.6,
10646.2, 10641,
10663, 10659.7,
10667.4, 10664.3,
10687.3, 10685.4,
10692, 10690.8,
10696.9, 10694.8,
10701.7, 10699.2,
10710.6, 10709.1,
10714.1, 10714.4,
10718.9, 10717.8,
10723.6, 10723.2,
10724.9, 10724.5,
10728.6, 10726.1,
10733, 10730.7,
10735.7, 10733.4,
10739, 10736.9,
10743.5, 10742.7,
10750.6, 10747.9,
10756.8, 10753.5,
10762.6, 10757.6,
10764.7, 10760.9,
10776.5, 10772.5,
10778.1, 10775,
10780.4, 10777.9,
10784, 10781.8,
10786.3, 10783.6,
10790.9, 10787.8,
10794.4, 10791.1,
10797.7, 10794.8,
10800.4, 10796.7,
10804.2, 10801.9,
10807.5, 10805,
10810.6, 10807.9,
10812.7, 10811.2,
10814.5, 10813.7,
10818.7, 10816,
10822.9, 10820.2,
10827.6, 10824.7,
! -3.52441
! -3.52441
! -3.73145
! -3.31641
! -2.69531
! -3.73145
! -3.31641
! -2.69434
! -2.07324
! -2.90234
! -2.90234
! -4.14551
! -2.69531
! -2.28027
! -4.56055
! -3.10938
! -3.73145
! -2.69531
! -3.93848
! -2.90234
! -2.90137
! -3.10938
! -3.31738
! -4.14551
! -3.93848
! -3.31641
! -3.10938
! -2.69531
! -4.76758
! -5.18164
! -3.31641
! -3.10938
! -1.86621
! -1.24414
! -2.07227
! -2.4873
! -1.45117
! 0.207031
! -1.03613
! -0.414062
! -0.415039
! -2.4873
! -2.28027
! -2.28027
! -2.07227
! -0.829102
! -2.69434
! -3.31641
! -4.97559
! -3.73145
! -3.93848
! -3.10938
! -2.4873
! -2.28027
! -2.69531
! -3.10938
! -3.31641
! -2.90234
! -3.73145
! -2.28027
! -2.4873
! -2.69531
! -1.45117
! -0.829102
! -2.69531
! -2.69434
! -2.90137
10830.7, 10828,
10835.5, 10834.5,
10838.2, 10837.2,
10843, 10840.7,
10844.2, 10842.5,
10847.7, 10847.7,
10855.4, 10857.3,
10860.8, 10862.3,
10898.2, 10894.7,
10900.5, 10897.6,
10904.3, 10902,
10906.7, 10903.8,
10912.8, 10909.6,
10916.7, 10912.8,
10919.6, 10915.7,
10923.1, 10919,
10924.7, 10921.4,
10927.6, 10924.5,
10930.7, 10926.8,
10932.8, 10929.3,
10934.9, 10931.6,
10939, 10934.3,
10941.9, 10937,
10945.5, 10941.1,
10950.2, 10945.6,
10952.9, 10949.3,
10958.2, 10953.1,
10959.9, 10955.6,
10962.2, 10958.2,
10965.3, 10960.1,
10968, 10961.4,
10970.3, 10965.9,
10973.4, 10968.6,
10976.1, 10971.7,
10978.1, 10974.2,
10981.4, 10975.6,
10984.2, 10977.3,
10986.5, 10980.5,
10992.3, 10986.5,
10994.4, 10990.2,
11004.3, 10997.9,
11007.2, 11001.8,
11009.5, 11005.8,
11017, 11015.3,
11024.8, 11018,
11027.3, 11021.3,
11029.2, 11025.5,
11031.3, 11027.9,
11035.2, 11031.9,
11041.2, 11037.9,
11044.1, 11040,
11047.8, 11043.7,
11049.9, 11045.3,
11051.7, 11047.4,
11053.6, 11050.3,
11055.9, 11053,
11077, 11068.7,
11078.2, 11070.4,
11080.1, 11072,
11082.8, 11074.7,
11089.4, 11088.6,
11099.5, 11099.3,
11116.3, 11112.3,
11120.8, 11116.7,
11124, 11119.4,
11126.4, 11122.5,
11148.5, 11148.7,
-2.69434
-1.03711
-1.03613
-2.28027
-1.6582
0
1.86621
1.45117
-3.52344
-2.90234
-2.28027
-2.90137
-3.10938
-3.93848
-3.93848
-4.14648
-3.31738
-3.10938
-3.93848
-3.52344
-3.31641
-4.76758
-4.97461
-4.35352
-4.56055
-3.52344
-5.18262
-4.35254
-3.93848
-5.18164
-6.63379
-4.35352
-4.76758
-4.35352
-3.93848
-5.80469
-6.84082
-6.01172
-5.80371
-4.14551
-6.42578
-5.38965
-3.73145
-1.65918
-6.84082
-6.01172
-3.73145
-3.31641
-3.31641
-3.31641
-4.14551
-4.14551
-4.56055
-4.35352
-3.31641
-2.90234
-8.29199
-7.87793
-8.08496
-8.08496
-0.829102
-0.207031
-3.93848
-4.14648
-4.56055
-3.93848
0.208008
11159, 11158.6, ! -0.414062
11184.7, 11178.7, ! -6.01172
11187.2, 11181.2, ! -6.01172
11188.7, 11186.6, ! -2.07324
11190.9, 11189.3, ! -1.6582
11196.7, 11193, ! -3.73145
11200.7, 11195.7, ! -4.97461
11204.4, 11198.4, ! -6.01172
11209.6, 11204, ! -5.59668
11213.1, 11206.9, ! -6.21875
11218.9, 11214.3, ! -4.56055
11221.6, 11215.8, ! -5.80469
11225.6, 11220.2, ! -5.38965
11231.4, 11225.6, ! -5.80371
11236.5, 11230.1, ! -6.42578
11238.2, 11230.9, ! -7.25488
11244.4, 11236.5, ! -7.87695
11247.7, 11239.9, ! -7.87793
11251.3, 11243.8, ! -7.46191
11260, 11249.8, ! -10.1582
11263.1, 11256.7, ! -6.42676
11266, 11262.5, ! -3.52441
11269.9, 11266.4, ! -3.52441
11273.5, 11273.7, ! 0.208008
11278, 11 275.7, ! -2.28027
11283.4, 11278.9, ! -4.56055
11285.5, 11280.9, ! -4.56055
11288.2, 11285.5, ! -2.69531
11289.8, 11289.6, ! -0.208008
11293.5, 11293.5, ! 0
11297.3, 11296.3, ! -1.03711
11305.9, 11300.5, ! -5.38965
11309.6, 11302.6, ! -7.04785
11312.3, 11304.2, ! -8.08496
11317.8, 11309.5, ! -8.29199
11322.4, 11313.7, ! -8.70605
11325.7, 11320.1, ! -5.59668
11327.6, 11321.5, ! -6.01172
11330, 11 323.8, ! -6.21875
11332.1, 11327.1, ! -4.97559
11334.4, 11329.2, ! -5.18262
11336.7, 11331.3, ! -5.38965
11338.7, 11335, ! -3.73145
11341.2, 11338.3, ! -2.90137
11344.1, 11342.1, ! -2.07324
11346.8, 11345.4, ! -1.45117
11354.9, 11348.7, ! -6.21875
11356.4, 11350.1, ! -6.21875
11358.9, 11353.9, ! -4.97461
11362.2, 11358, ! -4.14648
11390.9, 11390.9, ! 0
11394.5, 11393.2, ! -1.24414
11406.1, 11404.7, ! -1.45117
11423.9, 11419.4, ! -4.56055
11427.3, 11422.5, ! -4.76758
11436.8, 11435.3, ! -1.45117
11442.7, 11438, ! -4.76758
11451.4, 11440.9, ! -10.5723
11456.4, 11446.1, ! -10.3643
11458.9, 11447.7, ! -11.1934
11461.6, 11449.2, ! -12.4375
11463, 11 450.6, ! -12.4375
11465.5, 11452.3, ! -13.2666
11467, 11 457, ! -9.9502
11468.2, 11460.1, ! -8.08496
11471.8, 11462.4, ! -9.32812
11473.4, 11464.9, ! -8.49902
11476.3, 11467.8, ! -8.49902
11478.4, 11472, ! -6.42676
11480.7, 11475.1, ! -5.59668
11484.4, 11483, ! -1.45117
11486.3, 11484.8, ! -1.45117
11487.3, 11487.1, ! -0.208008
11488.5, 11489, ! 0.414062
11489.8, 11491.2, ! 1.45117
11492.7, 11495.2, ! 2.4873
11494.3, 11496.8, ! 2.48828
11495.6, 11498.1, ! 2.4873
11501.8, 11501.2, ! -0.62207
11504.3, 11506.4, ! 2.07324
11506.5, 11508.4, ! 1.86621
11508, 11509.4, ! 1.45117
11510.9, 11512.5, ! 1.6582
11514.6, 11514.6, ! 0
11516.3, 11516.3, ! 0
11521, 11520, ! -1.03613
11522.9, 11521.2, ! -1.65918
11524.1, 11522.3, ! -1.86523
11526.2, 11526.2, ! 0
11527.7, 11528.3, ! 0.62207
11530.8, 11530.4, ! -0.415039
11533.7, 11531.6, ! -2.07324
11545.7, 11545.3, ! -0.414062
11549.4, 11550.2, ! 0.829102
11550.6, 11551.6, ! 1.03613
11556.2, 11554.1, ! -2.07324
11573.9, 11569.4, ! -4.56055
11578.5, 11573.3, ! -5.18262
11599.1, 11593, ! -6.01172
11603, 11595.9, ! -7.04785
11605.7, 11600.5, ! -5.18262
11608, 11601.7, ! -6.21875
11610.5, 11603.4, ! -7.04785
11612.1, 11605.3, ! -6.84082
11614.6, 11607.6, ! -7.04883
11617.1, 11609.4, ! -7.66992
11620.2, 11611.3, ! -8.91406
11623.1, 11613.1, ! -9.9502
11625.6, 11614.6, ! -10.9863
11630.6, 11621.9, ! -8.70703
11634.3, 11626.4, ! -7.87695
11638.6, 11629.1, ! -9.53516
11640.3, 11632.2, ! -8.08398
11642.4, 11634.9, ! -7.46289
11644.2, 11636.2, ! -8.08398
11646.1, 11637.4, ! -8.70703
11649.9, 11639, ! -10.9873
11651.2, 11640.6, ! -10.5713
11653.5, 11642.7, ! -10.7793
11655.5, 11645.2, ! -10.3652
11657, 11 647.2, ! -9.74316
11659.3, 11650.4, ! -8.91406
11662, 11 652.4, ! -9.53516
11664, 11654.1, ! -9.9502
11667.4, 11657, ! -10.3652
11669.2, 11659.1, ! -10.1572
11671.7, 11663, ! -8.70605
11674, 11 664.7, ! -9.32812
11676.3, 11666.9, ! -9.32812
11677.7, 11669.6, ! -8.08496
11680.6, 11671.7, ! -8.91406
11685, 11 676.5, ! -8.49902
11688.1, 11678.5, ! -9.53516
11691.4, 11680.2, ! -11.1943
r
11695.1, 11683.1,
11698.2, 11685.6,
11705.1, 11693.5,
11715.6, 11701.5,
11719, 11704.9,
11720.4, 11706.5,
11722.5, 11708,
11725.6, 11711.5,
11729.5, 11713.8,
11733.3, 11717.7,
11740.7, 11727.7,
11742, 11729.5,
11742.6, 11732,
11745.7, 11734.1,
11748, 11737,
11750.7, 11740.5,
11754.8, 11744.2,
11758.1, 11747.1,
11760, 11748.4,
11761.9, 11750.5,
11763.3, 11751.9,
11767.7, 11756.5,
11770.4, 11758.7,
11773.9, 11762.3,
11777.2, 11766.6,
11780.3, 11769.5,
11784, 11774.9,
11786.7, 11777.6,
11788.3, 11780.2,
11790.4, 11782.3,
11799, 11785.7,
11803.1, 11789.2,
11838.3, 11827.7,
11849.5, 11839.8,
11858.1, 11845.1,
11863.1, 11851.1,
11866.2, 11855.7,
11873.7, 11865.8,
11883, 11871.2,
11885.9, 11873.5,
11888.2, 11876,
11891.1, 11878.5,
11893.6, 11880.1,
11897.1, 11884.1,
11900.4, 11887.1,
11902.9, 11889.4,
11905.6, 11891.7,
11907.2, 11893.5,
11909.5, 11898.3,
11915.5, 11907.8,
11916.5, 11909.7,
11919.9, 11912.4,
11925.5, 11917.4,
11947.6, 11940.2,
11972.5, 11965.5,
11977.5, 11972.9,
11988.6, 11979.3,
11995.9, 11983.4,
11998.8, 11987.6,
12001.1, 11989.4,
12003.1, 11991.3,
12005.6, 11993.4,
12010.8, 11998.6,
12015.8, 12003.5,
12023.9, 12012.5,
12028.7, 12019.6,
12031.8, 12023.3,
! -12.0234
! -12.6455
! -11.6094
! -14.0957
! -14.0957
! -13.8887
! -14.5107
! -14.0957
! -15.7539
! -15.5469
! -13.0596
! -12.4375
! -10.5723
! -11.6084
-10.9863
! -10.1572
! -10.5723
! -10.9873
! -11.6084
! -11.4004
! -11.4014
! -11.1943
! -11.6084
! -11.6084
! -10.5723
! -10.7793
! -9.12109
! -9.12109
! -8.08496
! -8.08398
! -13.2676
! -13.8887
! -10.5723
! -9.74316
! -13.0596
! -12.0225
! -10.5713
! -7.87695
! -11.8154
! -12.4375
! -12.2305
! -12.6455
! -13.4736
! -13.0596
! -13.2676
! -13.4746
! -13.8896
! -13.6816
! -11.1943
! -7.66992
! -6.84082
! -7.46289
! -8.08496
! -7.46289
! -7.04785
! -4.56055
! -9.32812
! -12.4375
! -11.1943
! -11.6094
! -11.8154
! -12.2305
! -12.2305
! -12.2305
! -11.4-014
! -9.12109
! -8.49902
M
12034.1, 12025.8,
12061.6, 12052.5,
12064.1, 12055.2,
12071, 12061,
12074.3, 12063.9,
12080.1, 12071,
12081.9, 12073.4,
12088.6, 12081.9,
12090.9, 12084.2,
12092.9, 12085.3,
12114.3, 12101.7,
12115.8, 12103.5,
12117, 12104.4,
12138.8, 12134,
12150.8, 12143.1,
12153.5, 12149.6,
12156.6, 12151.8,
12160.5, 12154.5,
12168.2, 12164.9,
12175.7, 12169,
12176.5, 12171.1,
12181.5, 12173.8,
12183.8, 12175.7,
12186.1, 12177.6,
12190.6, 12180.7,
12192.3, 12185,
12201.3, 12193.4,
12203.2, 12195.3,
12213.5, 12201.1,
12215.2, 12203.4,
12218.1, 12206.5,
12221, 12210.2,
12223.3, 12212.5,
12227.2, 12214.8,
12237.1, 12223.8,
12240.4, 12226.7,
12242, 12228.1,
12243.9, 12230.2,
12246.2, 12231.7,
12247.5, 12234.1,
12249.4, 12236.1,
12260.4, 12247.5,
12262, 12250,
12264.1, 12251.7,
12266.4, 12253.3,
12269.3, 12255.2,
12271.8, 12256.6,
12274.7, 12259.1,
12275.7, 12261.8,
12277.6, 12264.3,
12280.7, 12267.2,
12282.1, 12269.1,
12284.4, 12272,
12285.8, 12273.7,
12292.6, 12278.9,
12298.6, 12286.4,
12303.6, 12292,
12307.9, 12296.9,
12323.2, 12313.5,
12336.9, 12321,
12340.9, 12325.1,
12349.5, 12336.9,
12358.2, 12342.9,
12361.3, 12347.4,
12364.8, 12351.8,
12367.3, 12353.9,
12371.1, 12356.3,
! -8.29199
! -9.12109
! -8.91406
-9.9502
! -10.3652
-9.12109
! -8.49902
! -6.63379
! -6.63379
! -7.66992
! -12.6455
! -12.2305
-12.6445
-4.76855
! -7.66992
! -3.93848
! -4.76758
! -6.01172
! -3.31641
-6.63379
! -5.38965
! -7.66992
! -8.08398
! -8.49902
-9.9502
-7.25586
-7.87695
-7.87695
! -12.4375
-11.8154
-11.6084
-10.7803
-10.7803
-12.4385
-13.2666
-13.6816
-13.8887
-13.6816
-14.5107
-13.4746
-13.2666
-12.8525
-12.0234
-12.4385
-13.0596
-14.0957
-15.1328
-15.5469
-13.8887
-13.2666
-13.4736
-13.0596
-12.4375
-12.0234
-13.6816
-12.2305
-11.6084
-10.9873
-9.74316
-15.9609
-15.7549
-12.6455
-15.3398
-13.8887
-13.0596
-13.4746
-14.7178
12372.1, 12357.8, ! -14.3027
12374.4, 12360.1, ! -14.3027
12379.6, 12366.7, ! -12.8525
12383.1, 12369.2, ! -13.8896
12384.9, 12371.1, ! -13.8887
12400.6, 12389.6, ! -10.9863
12413, 12403.1, ! -9.9502
12418.6, 12404.9, ! -13.6816
12422.1, 12408.7, ! -13.4736
12424, 12410.7, ! -13.2676
12424.4, 12412.4, ! -12.0234
12429.6, 12415.5, ! -14.0957
12432.7, 12417.6, ! -15.1328
12434, 12419.9, ! -14.0967
12435.4, 12422.1, ! -13.2676
12440, 12428.6, ! -11.4014
12443.9, 12430.8, ! -13.0596
12445.3, 12433.1, ! -12.2305
12447.8, 12436.4, ! -11.4014
12452.6, 12440.5, ! -12.0234
12456.9, 12443.6, ! -13.2666
12460, 12447, ! -13.0605
12462.1, 12448.6, ! -13.4736
12464.6, 12451.1, ! -13.4746
12466, 12453.8, ! -12.2305
12468.1, 12456.1, ! -12.0234
12469.4, 12459, ! -10.3652
12473.2, 12462.8, ! -10.3643
12475.9, 12465.1, ! -10.7793
12486.6, 12476.7, ! -9.9502
12488.7, 12478.6, ! -10.1582
12501, 12494.9, ! -6.01172
12528.9, 12515.8, ! -13.0596
12530.5, 12517.7, ! -12.8525
12534.1, 12520.8, ! -13.2676
12544.8, 12528.5, ! -16.377
12556.7, 12543.6, ! -13.0596
12558.7, 12546, ! -12.6455
12560.5, 12547.9, ! -12.6445
12563.2, 12550.6, ! -12.6455
12565.1, 12553.5, ! -11.6084
12569, 12555.6, ! -13.4736
12570.3, 12556.8, ! -13.4746
12574.4, 12560.5, ! -13.8887
12579.4, 12565.1, ! -14.3037
12583.6, 12568.7, ! -14.9248
12589, 12574.1, ! -14.9248
12593.6, 12579.9, ! -13.6816
12599.2, 12585.1, ! -14.0957
12629.3, 12622.7, ! -6.63379
12639.7, 12633.4, ! -6.21875
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 759 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN 15 04B 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN 15_04B
APIN
FN Prudhoe Bay Unit
COUN North Slope Borough
STAT Alaska
*** LIS COMMENT RECORD ***
~~~~~!!~~!!!!!~!~!~ Remark File Version 1.000
The data presented here is final and has been depth shifted to a PDCL
provided by Schlumberger dated 28 Dec 2007.
*** INFORMATION TABLE: LIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
1
Size Length
4 4
4 4
8
Total Data Records: 79
Tape File Start Depth = 9568.000000
Tape File End Depth = 12865.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
88 records...
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN 15 04B.xtf
LCC 150
CN BP Exploration (Alaska)
WN 15 04B
APIN
FN Prudhoe Bay Unit
COUN North Slope Boro
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
ROPS ROPS ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 AAPI
2 ROPS MWD 68 1 F/HR
Total Data Records: 158
Tape File Start Depth = 9568.000000
Tape File End Depth = 12865.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 167 records...
Minimum record length: 18 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/12/25
1718748
Ol
**** REEL TRAILER ****
MWD
08/03/18
BHI
O1
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
4 4
4 4
8
•
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR ROP
9568.0000 -999.2500 -999.2500
9568.5000 -999.2500 -999.2500
9600.0000 96.1605 -999.2500
9700.0000 -999.2500 -999.2500
9800.0000 -999.2500 -999.2500
9900.0000 41.8654 38.8008
10000.0000 22.9000 16.7000
10100.0000 145.5794 36.3886
10200.0000 27.4605 49.8535
10300.0000 44.5249 59.8700
10400.0000 67.7596 17.4399
10500.0000 139.2198 120.2576
10600.0000 172.9977 180.8254
10700.0000 76.9677 169.6302
10800.0000 129.0160 42.6685
10900.0000 78.2385 37.6057
11000.0000 55.1169 119.7047
11100.0000 42.5806 28.6757
11200.0000 174.5993 6.7000
11300.0000 168.6409 50.3865
11400.0000 56.5891 75.2000
11500.0000 122.9632 61.5359
11600.0000 42.1560 113.2654
11700.0000 36.6215 64.7926
11800.0000 63.3105 85.0685
11900.0000 87.0786 60.0552
12000.0000 61.7482 130.6366
12100.0000 48.4163 101.0372
12200.0000 80.7322 55.3583
12300.0000 82.2573 47.9029
12400.0000 60.6637 79.4471
12500.0000 70.0763 65.8859
12600.0000 59.7686 64.7867
12700.0000 54.3197 66.0803
12800.0000 50.6594 74.7601
12865.0000 -999.2500 -999.2500
Tape File Start Depth = 9568.000000
Tape File End Depth = 12865.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
•
.7
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9568.0000 -999.2500 -999.2500
9568.2500 -999.2500 -999.2500
9600.0000 94.8000 -999.2500
9700.0000 -999.2500 -999.2500
9800.0000 -999.2500 -999.2500
9900.0000 41.9000 35.5000
10000.0000 22.9000 16.7000
10100.0000 144.4000 36.8000
10200.0000 23.0000 49.8000
10300.0000 55.4000 19.5000
10400.0000 68.0000 17.5000
10500.0000 123.5000 125.2000
10600.0000 82.6000 189.5000
10700.0000 71.3000 154.6000
10800.0000 136.1000 42.3000
10900.0000 71.0000 32.2000
11000.0000 54.7000 121.4000
11100.0000 44.2000 30.7000
11200.0000 177.9000 33.7000
11300.0000 154.8000 43.8000
11400.0000 57.2000 74.3000
11500.0000 116.8000 66.7000
11600.0000 31.4000 95.3000
11700.0000 37.7000 84.1000
11800.0000 70.3000 91.9000
11900.0000 86.2000 62.9000
12000.0000 82.1000 117.7000
12100.0000 48.9000 110.7000
12200.0000 81.4000 57.2000
12300.0000 124.6000 35.8000
12400.0000 66.5000 69.8000
12500.0000 68.7000 87.6000
12600.0000 56.4000 91.8000
12700.0000 52.8000 49.8000
12800.0000 48.4000 101.0000
12865.0000 -999.2500 -999.2500
Tape File Start Depth = 9568.000000
Tape File End Depth = 12865.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
U
Tape Subfile 4 is type: LIS
• •
**** REEL HEADER ****
MWD
08/03/19
BHI
Ol
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
07/12/18
1718748
O1
2.375" CTK
*** LIS COMMENT RECORD ***
!!~!!!!!!! !!!!!!!!! Remark File Version 1.000
!!!!!!!!!! !!!!!!!!! Extract File: ldwg.las
Version I nformation
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
Well Info rmation Block
#MNEM.UNIT Data Type Information
STRT.FT 9570.0000: Starting Depth
STOP.FT 12120.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: 15-04BPB1
FLD FIELD: Prudhoe Bay Unit
LOC LOCATION: 70 deg 17' 49.453"N 148 deg 34' 23.963"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 2.375" CTK
DATE. LOG DATE: 18 Dec 2007
API API NUMBER: 500292072670
Parameter Information Block
#MNEM.UNIT Value Description
#--------- --------- - -- - ------------------------
SECT. 22 Section
TOWN.N T11N Township
RANG. R14E Range
PDAT. MSL Permanent Datum
EPD .F 0 Elevation Of Perm. Datum
LMF DF Log Measured from
FAPD.F 63 Feet Above Perm. Datum
DMF RF Drilling Measured From
EKB .F 0 Elevation of Kelly Bushing
EDF .F 63 Elevation of Derrick Floor
EGL .F 0 Elevation of Ground Level
CASE.F N/A Casing Depth
OS1 DIRECTIONAL Other Services Line 1
Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
~.:4, r
i ~, ~,,~....x
(2) All depths are Bit Depths unless
(3) All True Vertical Depths (SSTVD)
(4) All Formation Evaluation data is
(5) Baker Hughes INTEQ utilized Coil'
Advantage
otherwise noted.
are Subsea corrected.
realtime data.
Prak downhole tools and the
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer Downhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to well
15-04B above the
Kick Off Point (KOP) 10240 feet MD carrying the final shift from
the KOP to the
bottom logged interval.
(8) Tied to 15-04 at 9600 feet MD (8414 ft. TVDSS)
(9) The sidetrack 15-04B was drilled off a permanent whipstock set at
9806 feet MD
(8419 feet TVDSS) through a milled window in 4 1/2 inch and 7 inch
liner.
Top of window 9808 ft.MD (8420 ft.TVDSS)
Bottom of window 9816 ft.MD (8427 ft.TVDSS)
(10) The interval from 12119 feet to 12142 feet MD (8841 feet to 8841
feet TVDSS) was not logged
due to sensor to bit offset at well TD.
MNEMONICS:
GRAX -> Gamma R ay [MWD] (MWD-API units)
ROP_AVG -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth
CURVE SHIF T DATA
BASELINE, MEASURED, DISPLACEMENT
9570.49, 9571.53, ! 1.03613
9575.68, 9576.3, ! 0.62207
9577.96, 9578.58, ! 0.62207
9584.59, 9585.63, ! 1.03613
9589.57, 9589.77, ! 0.207031
9594.96, 9595.37, ! 0.415039
9597.86, 9597.86, ! 0
9599.72, 9599.52, ! -0.207031
9603.87, 9603.25, ! -0.62207
9605.94, 9604.7, ! -1.24316
9609.05, 9607.81, ! -1.24414
9610.5, 9610.29, ! -0.207031
9614.03, 9614.44, ! 0.415039
9618.38, 9619.21, ! 0.829102
9622.94, 9624.39, ! 1.45117
9646.36, 9645.54, ! -0.829102
9648.64, 9647.82, ! -0.829102
9652.17, 9651.96, ! -0.207031
9803.5, 9803.3, ! -0.207031
9810.59, 9808.72, ! -1.86621
9812.04, 9812.04, ! 0
9813.7, 9814.11, ! 0.414062
9814.94, 9815.98, ! 1.03711
9818.05, 9818.26, ! 0.208008
9822.2, 9821.99, ! -0.208008
9824.06, 9824.06, ! 0
9825.1, 9825.52, ! 0.414062
9826.76, 9827.17, ! 0.414062
9829.25, 9829.45, ! 0.207031
9830.08, 9830.28, ! 0.207031
9832.98, 9832.77, ! -0.207031
9835.26, 9834.43, ! -0.829102
9837.75, 9838.16, ! 0.415039
9840.03, 9841.06, ! 1.03613
9845.11, 9845.11, ! 0
9846.2, 9846.82, ! 0.62207
9850.14, 9850.76, ! 0.62207
9851.17, 9852, ! 0.829102
9855.11, 9855.73, ! 0.62207
9856.15, 9856.98, ! 0.829102
9857.39, 9858.22, ! 0.829102
9859.05, 9859.88, ! 0.829102
9863.82, 9864.03, ! 0.207031
9865.48, 9865.89, ! 0.415039
9867.76, 9869, ! 1.24414
9873.98, 9873.77, ! -0.207031
9879.16, 9878.12, ! -1.03613
9880.4, 9879.57, ! -0.829102
9882.06, 9881.23, ! -0.829102
9883.5, 9883.3, ! -0.207031
9889.72, 9889.93, ! 0.208008
9891.17, 9891.8, ! 0.62207
9892.21, 9893.66, ! 1.45117
9893.25, 9894.7, ! 1.45117
9897.19, 9898.22, ! 1.03613
9903.61, 9902.78, ! -0.830078
9907.34, 9907.14, ! -0.207031
9909, 99 09.21, ! 0.207031
9914.33, 9914.75, ! 0.415039
9916.61, 9916.82, ! 0.208008
9920.97, 9920.97, ! 0
9924.49, 9924.49, ! 0
9925.53, 9926.56, ! 1.03613
9926.77, 9928.22, ! 1.4502
9930.09, 9930.92, ! 0.829102
9931.54, 9932.58, ! 1.03613
9933.2, 9933.61, ! 0.415039
9934.23, 9934.86, ! 0.62207
9938.38, 9937.14, ! -1.24414
9939.42, 9938.79, ! -0.62207
9941.28, 9942.11, ! 0.829102
9943.15, 9943.98, ! 0.829102
9945.22, 9946.88, ! 1.6582
9949.99, 9949.99, ! 0
9970.1, 9968.85, ! -1.24316
9979.37, 9980.2, ! 0.829102
9990.15, 9989.32, ! -0.829102
9993.67, 9993.05, ! -0.62207
9997.6, 9997.81, ! 0.207031
10002.6, 10002.8, ! 0.207031
10004, 1 0004.6, ! 0.62207
10008.6, 10008.4, ! -0.207031
10017.2, 10017, ! -0.207031
10025.5, 10026.3, ! 0.829102
10029.2, 10029.8, ! 0.62207
10030.2, 10031.1, ! 0.829102
10032.3, 10033.4, ! 1.03613
10036, 1 0036.5, ! 0.414062
10039.4, 10039.6, ! 0.207031
10041.9, 10042.5, ! 0.62207
10047.4, 10047.4, ! 0
10049.1, 10048.4, ! -0.62207
10051.3, 10051.1, ! -0.208008
10052.6, 10053.4, ! 0.829102
10056.3, 10056.9, ! 0.62207
10058.2, 10058.8, ! 0.62207
10059, 1 0060, ! 1.03613
10060, 1 0060.9, ! 0.829102
10061,3, 10062.1, ! 0.829102
10064.6, 10065, ! 0.414062
10065,6, 10066.7, ! 1.03711
10067.7, 10068.3, ! 0.62207
10068.5, 10069.4,
10071.4, 10071.4,
10073.3, 10072.9,
10075, 10075.2,
10078.1, 10078.3,
10083.5, 10082.4,
10086.4, 10085.1,
10089.5, 10088.4,
10092.6, 10093.2,
10093.9, 10094.9,
10096.6, 10097.6,
10098.2, 10098.6,
10099.5, 10099.7,
10101.5, 10101.3,
10103.8, 10103.2,
10105.3, 10105.1,
10110, 10109.8,
10115.6, 10115,
10121.4, 10121.2,
10127.6, 10127.6,
10131.5, 10131.5,
10156.8, 10156.6,
10158.3, 10158.1,
10159.7, 10159.9,
10162.4, 10161.4,
10162.8, 10162.8,
10164.1, 10165.1,
10165.3, 10166.8,
10169.3, 10170.3,
10174.9, 10175.1,
10176.9, 10176.5,
10180.7, 10180.2,
10181.5, 10181.1,
10182.9, 10183.4,
10185.8, 10185.8,
10188.5, 10189.6,
10190.2, 10190.8,
10196, 10195.8,
10197.5, 10198.1,
10199.1, 10199.7,
10201.8, 10202,
10203.3, 10203.3,
10221.1, 10220.5,
10224.2, 10223.6,
10225.2, 10224.8,
10226.7, 10226,
10230.2, 10229.6,
10235.2, 10233.5,
10236.8, 10237.2,
10238.1, 10238.3,
10239.5, 10240.1,
EOZ
END
0.829102
0
-0.414062
0.208008
0.207031
-1.03711
-1.24316
-1.03613
0.621094
1.03613
1.03711
0.415039
0.207031
-0.207031
-0.62207
-0.208008
-0.207031
-0.62207
-0.207031
0
0
-0.208008
-0.207031
0.208008
-1.03613
0
1.03613
1.45117
1.03613
0.207031
-0.415039
-0.415039
-0.415039
0.414062
0
1.03613
0.62207
-0.207031
0.62207
0.62207
0.208008
0
-0.62207
-0.621094
-0.415039
-0.62207
-0.62207
-1.6582
0.414062
0.207031
0.62207
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
Minimum record length:
Maximum record length:
224 records...
10 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN 15 04B PB1 5.xtf
LCC 150
CN BP Exploration (Alaska) Inc.
WN 15_04B PB1
APIN
FN Prudhoe Bay Unit
COUN North Slope Borough
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted to well
15-04B from the KOP 10240 feet MD and above carrying the final shift from
the KOP to the bottom logged interval.
*** INFORMATION TABLE: LIFO
MNEM CHAN DIMT CNAM ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
8
Total Data Records: 61
Tape File Start Depth = 9570.000000
Tape File End Depth = 12120.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD .002
1024
70 records...
54 bytes
4124 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN 15 04B PBl.xtf
LCC 150
CN BP Exploration (Alaska)
WN 15 04B PB1
APIN
FN Prudhoe Bay Unit
COUN North Slope Boro
STAT Alaska
*** LIS COMMENT RECORD ***
" " ~!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: LIFO
MNEM CHAN DIMT CNAM ODEP
GRAX GRAX GRAX 0.0
ROPS ROPS ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is; 0
Datum Frame Size is; 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units Size Length
•
1 GRAX MWD 68 1 AAPI
2 ROPS MWD 68 1 F/HR
Total Data Records: 122
Tape File Start Depth = 9570.000000
Tape File End Depth = 12120.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 131 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
07/12/18
1718748
O1
**** REEL TRAILER ****
MWD
08/03/19
BHI
O1
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
4 4
4 4
8
•
•
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR ROP
9570.0000 46.0000 -999.2500
9570.5000 41.5000 -999.2500
9600.0000 95.6000 -999.2500
9700.0000 -999.2500 -999.2500
9800.0000 -999.2500 -999.2500
9900.0000 42.0000 35.5000
10000.0000 22.9000 16.7000
10100.0000 144.8000 36.8000
10200.0000 22.8000 49.8000
10300.0000 31.7000 69.5000
10400.0000 119.2000 73.1000
10500.0000 76.0000 84.0000
10600.0000 94.4000 158.4000
10700.0000 106.6000 68.9000
10800.0000 106.0000 38.4000
10900.0000 132.4000 53.3000
11000.0000 94.6000 91.7000
11100.0000 119.1000 55.6000
11200.0000 88.0000 74.8000
11300.0000 47.7000 81.6000
11400.0000 104.0000 59.2000
11500.0000 69.7000 99.1000
11600.0000 97.4000 73.2000
11700.0000 109.6000 87.2000
11800.0000 78.0000 58.6000
11900.0000 48.2000 132.3000
12000.0000 74.3000 84.5000
12100.0000 97.2000 37.0000
12120.0000 -999.2500 55.4000
Tape File Start Depth = 9570.000000
Tape File End Depth = 12120.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9570.0000 46.0000 -999.2500
9570.2500 45.3000 -999.2500
9600.0000 95.6000 -999.2500
9700.0000 -999.2500 -999.2500
9800.0000 -999.2500 -999.2500
9900.0000 42.0000 35.5000
10000.0000 22.9000 16.7000
10100.0000 144.8000 36.8000
10200.0000 22.8000 49.8000
10300.0000 31.7000 69.5000
10400.0000 119.2000 73.1000
10500.0000 76.0000 84.0000
10600.0000 94.4000 158.4000
10700.0000 106.6000 68.9000
10800.0000 106.0000 38.4000
10900.0000 132.4000 53.3000
11000.0000 94.6000 91.7000
11100.0000 119.1000 55.6000
11200.0000 88.0000 74.8000
11300.0000 47.7000 81.6000
11400.0000 104.0000 59.2000
11500.0000 69.7000 99.1000
11600.0000 97.4000 73.2000
11700.0000 109.6000 87.2000
11800.0000 78.0000 58.6000
11900.0000 48.2000 132.3000
12000.0000 74.3000 84.5000
12100.0000 97.2000 37.0000
12120.0000 -999.2500 55.4000
Tape File Start Depth = 9570.000000
Tape File End Depth = 12120.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS