Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-138 • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other. 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 207-138 3. Address: P.O.Box 196612 Anchorage, Development 21 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number. 50-029-20726-02-00 7. Property Designation(Lease Number): ADL 0028306 8. Well Name and Number. PBU 15-04B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED E C E I V E D Total Depth: measured 12865 feet Plugs measured 12704 fee true vertical 8881 feet Junk measured feet AUG 3 1 .2017 Effective Depth: measured 11030 feet Packer measured See Attachment feet true vertical 8895 feet Packer true vertical See Attachment feet AOG CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 81 20"91.5#H-40 31-111 31-111 1490 470 Surface 2621 13-3/8"72#L-80 29-2650 29-2650 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet sciTrue vertical depth: See Attachment feet c 1��iE) NOV I) 2 2017 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 249 21356 0 1100 423 Subsequent to operation: Shut-In 1000 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Odom,Kristine Contact Name: Odom,Kristine Authorized Title: DS 06&13 PE Contact Email: Kristine.Odomibp.com Authorized Signature: Date: 6/30hr7 Contact Phone: (907)564-5365 Form 10-404 Revised 04/2017 V71- 10/..,--- :.1 //L de(07.1 7 R B D M S v- SO — 5 2017 Submit Original Only • • RECEIVED AUG 312017 AOGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary August 30, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Adding Perforations for Well 15-04B, PTD # 207-138. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Packers and SSV's Attachment PBU 15-04B SW Name Type MD TVD Depscription 15-04B PACKER 2449.59 2449.48 7" BAKER SBP PACKER 15-04B TBG PACKER 9002.4 7858.95 4-1/2" Baker S-3 Hydro Set Packer 15-04B TBG PACKER 9099 7931.59 3-1/2" Baker FB-1 Packer • d a.O000O090OOMM 0 - N d 0 0 0 0 O r r V • OOOOO 000000 3 v OM) OHO N N , co� CO- m v co co I• co co co O O O OO 0 .— M M NO O .— O 1- OO O OO N- N 0 W 0M000 V ,tMOO NN. CON- COCOCO N- CO > i i l l l l l i l i i I- CO Q) tC) CO N CO CO N. c— Tr O I� CO I's V— C) N N LON M M O N M OO) 03O - COMMON— N c000 00 OO ✓ p COW MNN2N000NM0 M • W 0. 0 0 O O Oo OD O 0 . co 'N N V N M N Q) CO a0 N - N W CV V N " ou = N ZNI FNM ' .M 4 c o CO O 1� O 00 co N OO �O CO C') O O M O W W Q Q Oc W W•N UU W ca cc re Z Z Zuou_ ccrecere Z W W W W W W m m m O D -tF- ZZZZDDD U coZZJJJJH- I— I— i • H CO N 0 ti 0) CO CO Cl) O) O) 0 CO 0 N- CO N r- L O O N CO Cr) CO c- CO N CO OO •- CO vt CN M0 aM CO a0 O O 0m N to 0 N O Cr) (NI co O) O) 0 0 0 0 0 0 0 0 0 G CO CO 0 CO a) 003 CO OO CO CO CO CO 00 00 U) a)) CCOO CO I- a. O I— tO O) to CO Cr) 00 N N 0) CO N O) 0 V N- t N N CO ` a) CO A- Cl) CO 00 C) N r- to CO N (1) Cl) N O 0) O0) O O O O O 0)) O oi O O 0 0 O) a) a) 0) 0 00 co 0) a) a) 0) 0) co co 0) O) > 0 00 CO a)) 0 0 CO 03 a) a) CO 00 CO CO 0 0 0 0 2 cc w a w 0 o z F- a W m 5 5 U Y O 0 t N vt N A-- O O O O O O O O O O O O N - J 00W a CO 0) 'd' LO N co co co tO v '- to V' CO to O) J J J Q Q U) W Q' m ' d LO •CO r- N Vt CO N- CO A- N CO (0 Q Q Q w a a _Z a 0 0 0 0 N N N N U 0 U J W w 0 -t L7 J J = g 00C-) Luaq .W Z p Z La w W a 2220 W CO a) v) ai CO gitt .1-1PO < 1.0 ° Z O N _O O) 0 0 0 0 0 0 0 0 0 O_ O O O = d �l CD � toCOOA-- ACA1A-- NMtMnC�O � � NCO • co0 0 0 O 0 N N N co n` lY (n J = 1 O a d 2 2 2 O m cn cn cn cn d a V O ° aaLL. aaaaaCCCCCCrcCeXCL to a a a a. a a a awwwwwwww a < < < < < < Q ¢ aaaaaaaa O t d a 0 w -J D W `� � � � � �0N- N- 0000000CO CO Op CO CO CO CO 0 a 7 Q C N N N O O O O O O O O O O O O W LL Ll N N N N N N N N N N N N Z a d < W W M N N N N O O) O) CO CO CO CO CO CO CO CO CO O a C7 L7 U W W ct 0 i tiLLI i r� comcflCo m o °g °-g _i -i a a w w Q Q CO CO t� ti cn cn a cc m E z m m m m m m m m m m m m m m m m stvvvgct 'Tr vvv •ct- v 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u. a co o t L N ceI t tci to to to to to to to to to to to in to co to m a a 0_ 0 --I a a w a Q a m m u_ co cn a re • • • in °' c v LLI o " Jorn (U C = s U o = o 0 = 0 ,- o o Q_e- (Li) 0 w 13 U o 0 -0 U CO Q.. 0 a) a) N � � cv Cin OO � 2 a a) .c co • ca ' '_ o U) U U N = U -§- 't NQ4* 0 U 0L o0d d L c U -0 cc U0 0 (0 E 47:5 C I- 0 s- = d' �' N 0 0 (p U c' F- U O E N .0 O c (t)O fn 00 a) 0 0 U) U (Er w 2 L O cc)O N O_0 O E us p03 U O r N- ' 0) 7 O +-' ° p = C . • �`.( N 0 3 H ++ N (0 N O V Y _ -C O r_.' C 0 3 (O w Q a� a c (/) N 0 • O m O 10 CL 0 C U 3 T= 't 0)0_ IC p M �' O U ° ° � °' J - 030 = .co E �, � Q- O E m Q ce Tca � � oo � � o E 0 d2 C� '' = cCo 0c° 0 v- L = a Q g 0)'t .- a E ai a) cn >. Ca co I- = 300- E 0- N N � I` w=2 N- 0 (� - = 'F- ' Cl.) 0) 0) m • 0 ` Q O C C o Y N (U 't - O) O N 3 dQ� C N = O _N 0 N Nom .1= a) Co N - N L r d d Q)N N- a) O a) N �Np N Y O E . O 7 rX "' O (n OJ OCOO N ° -- Q c _c Ca Q � Q . � � � c 't E � ' Fe a3 5 't 3 4-0 3 O a E Loco) 0 a, .L 0 0 . _0 0 (p (nI- j= Ea .. 3 3 c c •c oa �- d N a .: N = � = 0 = O � C � O N 0 +p.' e—. -a � re a0e6 c a0 E -§ w- E en " Q (° c4t � � � o cQa = _� V m N U U 0 ° 3 O "O N o U *k (O C (p cn M ° U (n O • . >,N- * ;� gw = L C U :i C O_ 0 (MJZ (� V - = C CI - 0Ycc * o " OE Nw = * L Lb O tV 1-" w * CZa * a) a) 5co.-.(76 a) ` V +-' L C -0 cc j !- O C N Q 7 j - O M *0 a) O CU C bib E0 baip -aDovi ooai 't0 0c2) wo0aieo ' Q. Jc `0 0 _ -(7;5 .n E U > 0 > m rn ° C O > = Q-O > (h a) N 00 , , 0 a) o C N 0) j , C N C c) c‘s , 1 a N U 0 Y _ _ a) k0 = o �* O aN a0i c a° = *k0 ° - m ° .. 'En: * 0 3o o � o Ho - V I- 00 . oa'a)i UI- omo ? (aa�i = U � � = m * � � 0 2 . 0 - 0 - Ud Q. : U - .j °_m : 0 ° mcn : !nin W I- 0< N- N- N- E) , ..- a r � ,- >- N co O O _ 5 N co N M M M m U ti N- N Q TREE= Ow • • iWELLHEAD= FMC1 1 5-04B SAFETY/ NOTES: ETLLANGLE>70°@10396'. ACTUATOR= BAKER C OKB.ELEV= 63' BF ELEV= 1 I KOP= 3039'; ---i2199' �3-1 12"HES x NP,D=2.813" Max Angle= 99°@ 10947'1 Datum MU= 94259°t 2451' H 9-5/8"X 7"BKR LNR TOP PKR D=??? l�tum TVD= 8840'SS 111 f/ r1' GAS LFT MANDRELS 441 i1i 4ST MD TVD DEV TYPE VLV 1 LATCH PORT" DATE 111 �j 4 3354 33421 19 M410 DONDE RK 16 01/22/08 13-318"CSG,72#,L-80 BTC.D=12-347" — 2649' 141� 3 5556 5217 34 MING SO RK 20 09/22108 11MN 1 �1 2 7286 6612 42 O DMY RK 0 01/30/04 11 11, I 1 8921 7798 42 M1AG MY RK 0 01/30/04 Minimum ID =0.25" @ 11030" 1 1/ •1 2-318" RETAINER w/ORIFICE 1 .4 111 j' 8980' H3-1/2"HES X NP,D=2.813" 1 I �� �1�►Zt ►��1/, 9002' H7 X 3-1/2"PKR S-3 PROD PKR,D=3.875 11j' �.1.� � I �, � 9027' �—3-1J2°'t-1Es X NP,D=2.813^ 1 3-1/2"TBG,9.2#,93CR-80 VAM TOP, I—{ 9080' '1 �1� 9087' 1 7 X 3-1/2"UNDUE OVERSHOT 1-0087 bpf,D=2.992" i 1 $4 �� " 1 /1 '•., 9112' 7-1/2"x 3-1/2'BKR FB-1 PKR D=4.0' ' /1/►Zi ►�r'1 1�i ■�!i 9115' j—3-1/2"BKR SEAL BORE EXTENSION 111 •4 '• .4 �� 11 ,1 9124` -13-1/2"BKR CONCHNTRENIC COLIPL/VG 111 �1� 1 1, 9125' 1—3-1/2"BKR SEAL BORE EXTENSION 1 TOC I 9144' 11 a., (174a� (1/ 9130" —J 3-1/2"BKR MPLOIT EXTENSION 7"TIEBACK LNR,26#,L-80,-0383 bpf,D=6.276" H 9167' 141 , ir•1 1�' ��i ►1' '1 9144' 1-12.70-DEPLOY MBdT SLV,D=2.250" 11 4 ,-` v4 k —, 9169' A--i9-5/8"X 4-112"BKR HYFLO HGRwtTEBACK 3-112"TBG,9.3#,L-80,.0087 bpf,ID=2.992" H 9202' 1 1/ 111111 '111 1114 ., 9171' —�3 v2^oTtsxNr�?D-2.7s" TOP OF 7"LNR H 9270' I X14' X11 111'11111+ 11/114 i 11� ►111 'A♦ 9202' --13-1/2"VI/LEG,D=2.992" .*II 4 11/114 11111111 ►1111//' HEM)ELN )11'LOGGED 12/04/90 A11 1111' 1, 1111 1111 11111 9-5/8"CSG,47#,L-80 BTC/SOO-95.0=8.681^ — 9688' 114.4 111 1 _ _ 1.11110 1111111 11/111.. 1111111 1111 11114 11114 N4'1 BAKER Nh-IPSTOCK(12/07/07) 06' 1111 1111' J—! 98__ J 111101 ►004.14 ►1114 1111 1111 11114 Ml LO IT WNDOW(15-048) 9808'-9816' 1/N1 1111 1RA TAG(12/12/07)_1-1 9813" 1111 1111 4 . 14111 X1104 PERFORATION SLAW RY 1014 14�,. REF LOG. SWS ME DRY CNUGRJCCL ON 12/28/07 1•..4 4•..•�4 ♦ 11030' —2-3/8"YVFT/NS REr /� x.1.1./. 1� ANGLEAT TOP FBF 80°@ 10400' 111 11,111*1* �� .. w/0.25 ORFICE(7/30/17) Note:Refer to FYoduction DB for historical perf data 111 16.•1•1.' .� AI SIZE 1 SFE I MERVAL Opn/Sqz SHOT f SQZ its v t4 .1.I 1 el&a,,,,,,N * "SEE PG 2 FOR PERF SUNWARY* 14 •. 1 I 1 �1 f1•1•1•1•1•1•.1 •*♦ 111111111 Iii.6 j11111/1, CSP — 12704' 1 ''� .:66.1111111111t1> __ �4*•14�i 1111111111 1114111114 � ?D.1— 12713' 4-1/2"SCAB LNR,12.6#.L-80,.0152 bpf,D=3.958" 10438' 444.4.4.0.4.4.4A _-- -- 2-3/8"LNR,4.7#,L-80 STL, 0039- bpf.D=1.995' — 12860' r LNR 29#,L-80,.0371 bpf,D=6.184" H 10460' DATE REV BY 1 COMMENTS DATE REV BY 006/MENTS PRUDHOE BAY INT 3 04/26/82. ORIGINAL COMPLETION 06/17/14 CRN/JMD ADFERFS(06/08-09/14) WELL 15-04B ,12/04/90 LAST WORKOVER 109/27/16 AVID MNOR EDITS PER TBG TALLIESPERMT No:"2071380 01/18/04 DAV/KAK CTD SIDETRACK(15-04A) 07/31/17 JCF/JMD SET RET w/ORFICE&ADPERFS All No: 50-029-20726-02-00 1 01/04/08 NORDIC1'CTD SIDETRACK(15-04B) SEC 22,T11N,R14E,1206'FN..&237'FWL 02/08/08 TEL/PJC GLV CIO(01/22/08) 11/11/10 SM/JMD DIG DRAFT CCTIONS , i 1 1 BP Exploration(Alaska) • TREE= CNV • • Wall-F ACTUATOR AR= FRC 15-04B AcnwroR= BAKER OKB.f3_EV= 63' 8F EiEV= ij i KOP= 3039' it L Max Angie= 99"@ 10947 I Datum MD= 10251' al Datum TVD= 8800'SS .4 4 / ►/ 1/ •411 • P. / ►/ 1/ 1�4 14 144 . 11 ;III° ►*4 1/ •l PERFORATION SUMMARY RY / 1 ►1 REF LOG. SVC CNJGR/CCL ON 12/28/07 .SVC M�N1I ANGLE AT TOP P89°@ 11090' 14 1, ERF. • Note.Refer to Production DB for historical perf data /1 ►1. SIZE SPF i INTERVAL Opn/Sgz SHOT SQZ ' 14 .•, rr 1� 1-11116" 6 10400-10432 0 07/29/17 i •. ./1 11� ,�I 1-11/16"1 6 ►111{10462-10494 0 07/29/17 •V ►jlj 1-11/16".1 6 10510-10642 0 07/28/17 1111 ��� 11111 1-11/16" !1 6 `10619-10651 0 07/28/17 X111 *14 111 ...�.► 1-11/16"I 6 111090- 11120 0 06/09/14 ///li//. 1.4/�1//4 1-11/16"1. 6 11120-11150 0 06/09/14 •1111111# 1111./111. ► 6 N•N4 1141,.. . 1-11/16"1 6 j'f 1150-11180 0 06/09/141111 1111 4 1111111 1/1/111 1-11116"; 6 11220 11250 0 06f08/14 A ►/11111 11111111 1-11/16" 6 111350'- 11450 0 01/04/08 11.114 111 1-11/16"; 6 111530-11640 0 01/04/08 111.111• ►111111 1-11/16"1 6 1 11670-11710 0 01/04/08 X111111* 11111114 1-11/16"I 6 111760- 11850 0 01/04/08 111111# 1111111 111920- 12140 0 01/04/08 1#`#111# 11111114 1-11/16" 6 1-11/16" 6 E 12210-12260 0 01/04/08 1:'11:1: 11111114 1144+4 ►..4.4 1-11/16" 6 112310-12350 0 01/04/08 141.11 4d.1 11-11/16"1 6 {12480- 12690 0 01/04/08 1* 1��1‘ �' 1 '_ i 11 1'1*V11* r1 • I 1.11 1/#111,4 4 • ►11 v1vi11v1v1v i v ��• 1111111114 1/11�111111111111 * Alp, p /.1.1.1.1.111.1.1.1 DATE REV BY COMMENTS DATE REV BY 1 COMMENTS F &UHOE BAY UNIT 04/26182 ORIGINAL COMPLETION 06/17/14 CRR/14) ADPERFS(06/08-09/14) WELL 15-048 1 12/04/90 LAST WORKOVB2 09/27/16 JND MINOR EDITS PE12 TBG TALLES PERMIT No "2071380 01/18/04 DAV/KAK CTD SIDETRACK(15-04A) i 07/31/17 JCF/JM3•SET RET w/ORFFICE&ADFERFS AFI No 50-029-20726-02-00 01/04108 NORUC1 CTD SIDETRACK(15-04B) SEC 22,T11 N,R14E, 1206'FN_&237'FWL 1 1 02/08/08 i TEL/PJC'GLV CIO (01/22/08) - 1 • 11/11/10 f WAD DRLG CRAFTCORRECT/DNS � j BP Exploration(Alaska) i RECEIVED -� S23-- FEB 132017 • 279 ' 5 ���� BAKER PRINT DISTRIBUTION LIST HUGHES AOGCC Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED 7-45 WELL NAME 15-04B 900 E. Benson Blvd. M.K BENDER ivl.K.BENDS Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D BHI DISTRICT Alaska LOG DATE January 21,2017 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(a�bakerhughes.com TODAYS DATE February 10,2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM (las,dlis, PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO* LOGS LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #OF PRIN I S #OF COPIES #OF COPIES #OF rCOPIES VnV V V V BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Sati��� ,I�.,1 3 @(" Anchorage,Alaska 99508 1�{ 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 0 1 0 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 0 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 I 1 1 0 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 stamp"confidentii'on all material deliver to DNR 6 BP Exploration(Alaska)Inc. 0 0 0 I 0 0 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:David Itter TOTALS FOR THIS PAGE: 0 3 4 0 0 TOTALS FOR ALL PAGES: 0 3 4 0 0 • • Image Project Well history File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~ ~- ~ ~ Well History File Identifier Organizing (aone> ~~,~=aea iiiimiiiuiiuii . Re,~a~~eeaed ouiiiiiuiuuii RES AN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: ^ Other:: BY: Maria Date: /s/ Project Proofing III II'lll VIII II III BY: Maria Date: /s/ ~~ Scanning Preparation ~ x 30 = --~- + ~ =TOTAL PAGES 1 (Count does not include cover sheet) r/~ /~' BY: Maria Date: '1'r7 //~l~ /s/ ~ I/' Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scan ing Preparation: --+~~ ' ES NO BY: Maria Date: ~ ~ ®~ /s/ ~~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO DIG/ITAL DATA +~ Diskettes, No. 1 ^ Other, No/Type: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II I I III ReScanned III IIIIIIIIIII VIII BY: Maria Date: /s/ Comments about this file: o~ , ~.~ke, iuuiimuimu 10/6/2005 Well History File Cover Page.doc ~Q s -~ ,~"` F< ,~.. ,~~ ~ ~ ~ P y ~; . ~,~ "~ ~ '` ~ ~,. ~ a ,~, t r~ k. ~5~` e MICROFILMED 6/30!2010 DO NOT PLACE ANY. N EW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 i~~~k~:''~~ J~~rl ~ ~ ~~~€ F~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission ~ ~ ~ ~~ 333 West 7th Avenue ~ + '_ Anchorage, Alaska 99501 ~~- ~ "~ Subject: Corrosion Inhibitor Treatments of GPB DS 15 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 15 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-15 Date: 01 /05/10 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 15-016 2042570 50029206960200- NA Sealed NA 15-026 2060720 50029206970200 NA Sealed NA 15-03 1820300 50029207220000 NA Sealed NA 15-046 2071380 50029207260200 NA Sealed NA 15-05A 1950340 50029207310100 NA Sealed NA 15-O6A 1982540 50029207420100 NA 6.7 NA 40.8 11 /7/2009 15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009 15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009 15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009 15-10A 1880850 50029205010100 NA Sealed NA 15-11 B 2041460 50029206530200 NA Sealed NA 15-12B 2060870 50029206650200 NA Sealed NA 15-13A 1991240 50029206450100 NA Sealed NA 15-14A 2042220 50029206820100 NA Sealed NA 15-15C 2081820 50029206910300 NA Sealed NA 15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009 15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009 15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009 15-19A 1990990 50029218290100 NA surface NA 15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009 15-21A 1990290 50029205030100 NA Sealed NA 15-22 1800970 50029205090000 NA Sealed NA 15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009 15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009 15-256 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009 15-26B 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009 15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009 15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009 15-296 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009 15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009 15-318 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009 15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009 15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009 15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009 15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009 15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009 15-376 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009 15-38A 2030160 50029224960100 NA Sealed NA 15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009 15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009 15-416 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009 15-426 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009 15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009 15-456 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009 15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009 15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009 15-486 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009 15-496 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009 DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071380 Well Name/No. PRUDHOE BAY UNIT 15-04B MD 12865 TVD 8881 Completion Date 1/4/2008 REQUIRED INFORMATION DATA INFORMATION Mud Log No Types Electric or Other Logs Run: MWD DIR / GR,GR /CCL /MCNL, SCMT /CCL / GR /PRESSURE / Well Log Information: Log/ Electr Data Digital Dataset Typle Med/Frmt Number Name e~ _ _ __--- - --- -- ED D it i Asc D ect onal Survey Rpt Directional Survey R pt Directional Survey a /Cog Cement Evaluation C Las 15946 ~amma Ray (~D C Las 15947/Gamma Ray ED C i Lis 15953 ~amma Ray ~,.ec,( eutron i ~ ~ `~ ' C Lis 16024 Neutron pt r~ Gamma Ray ~~// "ED C Lis 16351 f~Gamma Ray Cog Gamma Ray 6g IItL Gamma Ray /, ',"LOg See Notes -~Ktpt Gamma Ray C Lis 16352 /Gamma Ray ~og Gamma Ray LCog Gamma Ray ~og See Notes Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20726-02-00 Completion Status 1-OIL Samples No Current Status 1-OIL UIC N Directional Survey Log Log Run Scale Media No (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments Svc iv icvva vNcn ii iwcuvo ro i vii uwrtcuc msu 10218 12865 Open 1/10/2008 10122 12141 Open 1/10/2008 PB 1 5 Col 1 8950 12646 Open 1/22/2008 MCBL, PSP CCL, GR, Pres, Temp, CBL 28-Dec- 2007 9569 12865 Open 2/25/2008 LAS GR, ROP w./PDF graphics 9569 12141 Open 2/25/2008 P61 LAS GR, ROP w./PDF graphics 8900 12670 Case 2/28/2008 LIS Veri, GR, CCL w/PDS and Tit graphics 2 Blu 8968 12687 Open 3/13/2008 MCNL, Lee CCL, GR, CNL 28-Dec-2007 8956 12699 Open 3/13/2008 LIS Veri, GR, CNL 9568 12865 Open 5/28/2008 LIS Veri, GR, ROP 9568 12865 Open 5/28/2008 LIS Veri, GR, ROP 25 Col 9806 12858 Open 5/29/2008 TVD GR 25 Col 9806 12858 Open 5/29/2008 MD GR 2 Col 9560 12660 Open 5/29/2008 Deth Shift Monitor Plot 9570 12120 Open 5/28/2008 PB1 LIS Veri, GR, ROP 9570 12120 Open 5/28/2008 PB1 LIS Veri, GR, ROP 25 Col 9806 12142 Open 5/29/2008 PB1 TVD GR 25 Col 9806 12142 Open 5/29/2008 P61 MD GR 2 Col 9568 12120 Open 5/29/2008 P61 Deth Shift Monitor Plot ~~ DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071380 Well Name/No. PRUDHOE BAY UNIT 15-046 Operator BP EXPLORATION (ALASKA) INC MD 12865 TVD 8881 Completion Date 1/4/2008 Completion Status 1-OIL Current Status 1-OIL Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? YIN l Chips Received? lRTtd- Analysis 1'~#'" Received? Comments: Daily History Received? ~:lN Formation Tops P.a/ N API No. 50-029-20726-02-00 UIC N - - - --- - - - Compliance Reviewed By: _ _ _ _- __ __ Date: __ _.. i 1 BAKER F~V6NE5 Faker Atlas PRINT DISTRIBUTION LIST CUMYANY BP EXYLURAl1UN (ALASKA) !!NC CUUNI'Y WELL NAME 15-04B; IS-04BPB1 STATE FIELD PRUDHOE BAY UNIT THIS DISTRIBUTION LIST AUTHORIZED BY NUR lH SLUYE BURUUGH ALASKA DATE 5/27/2008 CATRINA GUIDRY SO #: 1718748 Copies of~ Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-I Address 900 E BENSON BLVD. ANCHORAGE. AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 1 Company DNR-DIVISION OF OIL & GAS Company Person KRISTIN DIRKS Person Address 550 WEST 7TH AVE Address SUITE 802 ANCHORAGE. AK 99501 Company Company Person Person Address Address i Data Disseminated Bv: BAKER ATLAS-PDC 1701 S Aldine Westfield. Houston Texas 77073 ~ ~ ' This Distribution List Comnleted Bv: • • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 15-04BPB1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 'I '~ 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - GR Directional TVD Log (to follow) LAC Job#: 1718748 Sent by: Catrina Guidry Date: OS/27E08 - - Received by: ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: ~9a') ~u7-6S~3 Baker Hughes INTEQ ~~~® 7260 Homer Drive ~ ~~ _. ~ Anchorage, Alaska 99518 _ ;' Direct: (907) 267-6612 ItYTEQ FAX: (907) 267-6623 r ~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 15-04B Contains the following: ~~ ~~ ~" 1 LDWG Compact Disc '@ (Includes Graphic Image files) 1 LDWG lister summary ' 1 color prints - GR Directional Measured Depth Log (to follow) '` 1 color prints - GR Directional TVD Log (to follow) LAC Job#: 1718748 Sent by: Catrina Guidry Date: 05/27/08 ~ c Received by: ~ ~`~ , Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: ~9~i7j 2o7-ObL3 ~~® i~v i ~tl Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 r _ ~ -,~ t ,r' " STATE OF ALASKA '~~~ ALASKA OIL AND GAS CONSERVATION COM SSION ~~~~1 V ~® JA,N 3 1 2008 WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~iaska Oil & Gas C®n~. COS~ln±ssion ~,n~~r 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b. Well Class: 20AAC 25.105 zoAAC zs.,,o ®Development ^ Exploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Abanf~;~ 12. Permit to Drill Number BP Exploration (Alaska) Inc. 1/4/2008 .~"" 207-138 3. Address: 6. Date Spudded ~ 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 12/12/2007' S0-029-20726-02-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: ' ' 12/25/2007- PBU 15-046 1206 FNL, 237 FWL, SEC. 22, T11 N, R14E, UM Top of Productive Horizon: 8. KB (ft above MSL): 63' 15. Field /Pool(s): , 1171' FNL, 3622' FEL, SEC. 21, T11 N, R14E, UM Ground (ft MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Pool 989' FNL, 1294' FEL, SEC. 21, T11N, R14E, UM 12704 8890 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD} 16. Property Designation: Surface: x- 676169 y- 5960280 Zone- ASP4 12865-. 8881 ~. ADL 028306 TPI: x- 672311 y- 5960226 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: Total Depth: x- 674633 y- 5960462 Zone- ASP4 None 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (l1/D): ' Submit electronic and rioted information er 20 AAC 25.050 N/A ft MSL 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): ! p~~ . ~ I MWD DiR / GR, GR /CCL / MCNL, SCMT /CCL / GR /Pressure /Temp / CBL G•//~t/~d//C~~~~~ ~TO~ ~d 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH' MD SETTING DEPTH TVD- HOLE AMOUNT WT. PER FT. GRADE ' TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 110' Surface 110' 30" 400 x Permafrost II 13-3l8" 72# L-80 Surface 2649' Surface 2649' 17-1/2" 2000 sx Fondu 400 sx PF'C' 9-5/8" 47# L-80 Surface 9588' Surface 8305' 12-1/4" 500 sx Class'G' 7" 29# L-80 9270' 8061' 8483' 8-1 /2" 350 sx'G p" 26# L-8Q Liner Tieback 2451' - 9167) 4-1/2" 12.6# L-80 9159' 9808' 7977' 8483' N/A Liner Tieback 2-3/8" 4.7# L-80 9144' 12860' 7965' 8881' 3" 73 sx Class'G' 97 sx Class'G' 23. Open to production or inject ion? ®Yes ^ No 24 Tue1NG RECORD If Yes, IISt each i (MD+TVD of Top & Bottom; Pe nterval Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 1.56" Gun Diameter 6 spf 3-1/2", 9.2#, 13Cr80 9087' 9002' , MD TVD MD TVD 3-1/2", 9.3#, L-80 9080' - 9202' 9112' 11350' - 11450' 8904' - 8907' FRACTURE CEMENT SQUEEZE ETC. ACID 25 11530' - 11640' 8906' - 8906' , , , . 11670' - 11710' 8907' - 8909' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 11760' - 11850' 8909' - 8902' 11920' - 12140' 8899' 8904' 12704' Set CIBP - 12210' - 12260' 8905' - 8903' 2500' Freeze Protected w/ McOH 12310' - 12350' 8903' - 8905' 2 2 ' ' ' ' 1 480 - 1 690 8901 - 8890 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): January 28, 2008 Flowing Date Of Test: HOUfS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 1/31/2008 4 TEST PERIOD 474 694 -0- 50 1,464 Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): Press. 507 1,680 24-HOUR RATE• 2,845 4,166 -0- 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None _ ~~° t~~ 4 L~~-~--~--- ` ~ .-,J Form 10-407 Revised 0212007 ~~ ~ CONTINUED ON REVERSE SIDE ~~~~5 ~~ I ~' ~y~[ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS NAME ` MD TVD Well Tested . ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 43SB 9823' 8496' None 42S6 /Zone 4A 9865' 8533' Top CGL /Zone 3 9929' 8593' Base CGL /Zone 2C 9983' 8645' 23SB /Zone 2B 10048' 8707' 22TS 10104' 8756' 21 TS /Zone 2A 10164' 8804' Zone 1 B 10272' 8876' TDF / Zone 1A 10322' 8909' Formation at Total Depth (Name): Zone 1 A 10322' 8909' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. h / (/ hh VS Signed Terrie Hubble itle Drilling Technologist Date v ~~ PBU 15-048 207-138 Prepared By Name/Number.~ Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/9/2007 20:00 - 00:00 4.00 MOB P PRE Move off DS7-08B and move to DS15.Had power outage as rig arrived on DS15 due to high engine temp. 12/10/2007 00:00 - 01:00 1.00 MOB P PRE Complete move to DS 15. 01:00 - 09:00 8.00 MOB N WAIT PRE Rig on standby. Wait on Bleed down of well and site prep. 09:00 - 11:00 2.00 MOB N WAIT PRE Wait on pad prep. Blade pad in front of well. Survey and blade 11:00 - 12:00 1.00 MOB P PRE 12:00 - 12:15 0.25 MOB P PRE 12:15 - 13:00 0.75 MOB P PRE 13:00 - 17:30 4.50 BOPSU P PRE 17:30 - 21:00 I 3.501 BOPSUR P I I PRE 21:00 - 00:00 3.00 BOPSU P PRE 12/11/2007 00:00 - 05:30 5.50 BOPSU P PRE 05:30 - 07:00 1.50 BOPSU P PRE 07:00 - 08:30 1.50 RIGU P PRE 08:30 - 10:45 2.25 RIGU P PRE 10:45 - 11:00 0.25 RIGU P PRE 11:00 - 12:30 1.50 RIGU P PRE 12:30 - 13:15 I 0.751 RIGU I P I I PRE 13:15 - 14:00 0.75 RIGU P PRE 14:00 - 17:30 3.50 STWHIP P WEXIT 17:30 - 20:45 3.25 STWHIP P WEXIT 20:45 - 21:00 0.25 STWHIP P WEXIT 21:00 - 22:30 1.50 STWHIP P WEXIT level for rig. Installed SWS coiled tubing pipe straightener onto re-built 480 injecter head, while waiting. Move rig in front of well. SAFETY MEETING. Review procedure, hazards and mitigation for backing the rig over the well. Back rig over well. Center rig over well and level rig. ACCEPT RIG AT 1300 HRS, 12/10/2007. Nipple up BOPE. Spot cuttings tank. Rig up hardline to Tiger Tank. Move in mini-camp and man camp. Pressure and function test BOPE. Test witnessed by AOGCC insoecter, Bob Noble. Send test report to AOGCC. Swab not holding. Call out grease crew Grease tree and pump open SSV. Test BOP against master. Rebuild choke valve #3. Continue with BOP test 250 psi low and 3500 psi hi. PU Lubricator, PJSM, Stab lubricator and PT to 1000 psi. Pull BPV with lubricator. R/D lubricator. SIWHP = 200 psi. M/U guide arch to injecter head after reel swap to 2" E-Coil and C/O to re-built injecter. Align injecter, pipe straightener and guide arch. SAFETY MEETING. Review procedure, hazards and mitigation for pulling 2" E-Coil to injecter. Pull test grapple. Pull coil into injecter. Align and calibrate pipe straightener. 800 psi hyd. press. straightens 2", 110 coil. Fill coil with 2# Biozan. Coil vol. = 40.0 bbls. Circ. across top of stack thru kill line to shaker to clean stack. Press test inner reel valve. Reverse Circ thru coil at 3.2 bpm, 4150 psi. 3 times. Heard e-line zing first time for 30 sec. Cut coil to find E-Line. Cut 32' of coil. M/U CTC and BHI UOC. E-Line tested OK. Bleed off 200 psi WHP to tiger tank. Well is dead. M/U Milling BHA #1 with 2.74" HCC diamond window mill, 2.73" reamer, BTT Xtreme motor. 2 jts 2-1/8" CSH and BHI tools. BHA OAL = 99.81'. RIH with 2.74" window milling BHA #1. Take returns to Tiger tank. Tag pinchpoint w/ pumps on at 9811'. Correct -3' to whipstock ~ pinch point at 9808'. Flag pipe. Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 2800-3000 psi, full returns, 1 K WOB, 1 FPH. Printed: 1/14/2008 8:58:28 AM ` ~ BP EXPLORATION Page 2 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task i Code NPT Phase Description of Operations 12/11/2007 21:00 - 22:30 1.50 STWHIP P WEXIT Milled to 9809'. 22:30 - 00:00 1.50 STWHIP P WEXIT Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 3100-3200 psi, full returns, 1.5K WOB, 1 FPH. Milled to 9810.3'. 12/12/2007 00:00 - 02:00 2.00 STWHIP P WEXIT Mill 2.74" window thru 4-1/2" x 7" liner. 1.5 bpm, 3200-3300 psi, full returns, 1.5K WOB, 1 FPH. Milled to 9811.8'. ~~` ~,3 KICK WHILE DRILLING DRILL 02:00 HRS 02:00 - 04:00 2.00 STWHIP P WEXIT Mill 2.74" window. 1.5 bpm, 3300-3400 psi, full returns, 2.5K WOB, 0.5 FPH. Milled to 9813.0'. 04:00 - 06:00 2.00 STWHIP P WEXIT Mill 2.74" window. 1.5 bpm, 3450 psi, full returns, 3K WOB, 0.5 FPH. Milled to 9814.0'. 06:00 - 09:00 3.00 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000 psi, 1-3K wob, 4 stalls at 9815'. Milled to 9815'. 09:00 - 12:00 3.00 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000 psi, 1 K wob, A few stalls at 9816'. 12:00 - 14:20 2.33 STWHIP P WEXIT Milling 2.74" lowside 4-1/2 X 7" window. 1.6 bpm, 3200-4000 psi, 1 K wob, Exit window at 9816'. Milled formation at 10 fph to 9826'. 14:20 - 15:30 1.17 STWHIP P WEXIT Ream window area. Swap to re-built FloPro. Stop pump and RIH clean thru window. Clean window. 15:30 - 17:30 2.00 STWHIP P WEXIT POH with milling BHA. Top of window is at 9808'. Bottom of window at 9816'. Held Kick While tripping drill at 1630 hrs. 17:30 - 17:40 0.17 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for laying out milling BHA and picking up BHI Build BHA. 17:40 - 18:15 0.58 STWHIP P WEXIT Lay out milling BHA. Mills gauged at 2.73/2.72" Go / No-Go.. 18:15 - 19:30 1.25 DRILL P PROD1 M/U BHI Build MWD BHA #2 with HYC BC Bit #1, 1.5 deg Xtreme motor and BHI tools. Stab injector. 19:30 - 22:45 3.25 DRILL P PROD1 RIH w/drilling build BHA #2. Tie in at 9600'. -8.5' correction. a btm at 9827'. 22:45 - 00:00 1.25 DRILL P PROD1 Drilling build at 1.50/1.50 bpm @ 3250 psi FS = 2900 psi, WOB 1.2K, ECD 10.1, ROP 45 fph, TF 150R Drilled to 9,865'. 12/13/2007 00:00 - 01:00 1.00 DRILL P PROD1 Drilling build at 1.58/1.58 bpm ~ 3300 psi, WOB 1.1 K, ECD 10.1, ROP 55 fph, TF 150R Drilled to 9,908'. 01:00 - 03:00 2.00 DRILL P PROD1 Drilling at 1.60/1.60 bpm ~ 3200 psi, WOB 0.6K, ECD 10.1, ROP 25 fph, TF 135R Slow and hard drilling, frequent stalls. Drilled to 9,950'. 03:00 - 03:15 0.25 DRILL P PROD1 Wiper to window. 03:15 - 06:00 2.75 DRILL P PROD1 Drilling at 1.50/1.50 bpm ~ 3100-3200 psi, WOB 1.1 K, ECD 10.1, ROP 20 fph, TF 90R Hard drilling, frequent stalls. Printed: 1/14/2008 8:58:28 AM ' ~ BP EXPLORATION Page 3 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To I Hours Task Code NPT I'~I Phase Description of Operations 12/13/2007 03:15 - 06:00 2.75 DRILL P 06:00 - 08:30 2.50 DRILL P 08:30 - 10:30 ~ 2.00 ~ DRILL ~ P 10:30 - 12:15 I 1.751 DRILL I P 12:15 - 12:45 0.50 DRILL P 12:45 - 16:00 3.25 DRILL P 16:00 - 16:30 0.50 DRILL P 16:30 - 18:00 1.50 DRILL P 18:00 - 19:30 I 1.501 DRILL I P 19:30 - 22:15 I 2.751 DRILL I P 22:15 - 23:15 1.00 DRILL P 23:15 - 00:00 0.75 DRILL P 12/14/2007 100:00 - 02:00 I 2.001 DRILL I P 02:00 - 03:45 I 1.751 DRILL I P 03:45 - 04:30 0.75 DRILL P 04:30 - 06:00 1.50 DRILL P 06:00 - 07:45 ~ 1.75 ~ DRILL ~ P 07:45 - 10:30 2.75 DRILL P 10:30 - 10:45 0.25 DRILL P 10:45 - 12:00 1.25 DRILL P 12:00 - 14:00 I 2.001 DRILL I P PROD1 Drilled to 9,990'. PROD1 Drilling Z3 and Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 80R TF, .5-1 K WOB, 10.2 ECD, 15 fph, 14 deg incl, Drilled to 10,040'. PRODi Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K WOB, 10.3 ECD, 15 fph, 20 deg incl, Drilled to 10,070'. PRODi Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K WOB, 10.3 ECD, 15 fph, 20 deg incl, Chert in samples. Drilled to 10,100'. PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. PROD1 Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K WOB, 10.3 ECD, 15 fph, 35 deg incl, Chert in samples. Drilled to 10,142'. PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. PROD1 Drilling Z2, 1.6 / 1.6 bpm, 3200-3800 psi, 50R TF, 1-2K WOB, 10.3 ECD, 15 fph, 40 deg incl, Drilled to 10172'. PROD1 Drilling Z2 at 1.68/1.68 bpm C~ 3600 psi, WOB 1.OK, ECD 10.5, ROP 25-50 fph, TF 50R, 49 deg incl. Drilled to 10,219'. PROD1 Drilling Z2 and Zi at 1.53/1.53 bpm ~ 3300-3500 psi, WOB 1.2K, ECD 10.4, ROP 40-50 fph, TF 50L, 58 deg incl. Drilled to 10,300'. PROD1 Wiper trip to window. Hole clean. Change out SLB depth counter. Tie in, +1' correction. RIH clean to btm. PROD1 Drilling Z1 at 1.58/1.58 bpm @ 3600 psi, WOB 1.3K, ECD 10.4, ROP 40 fph, TF 30L, 61 deg incl. Drilled to 10,325'. PROD1 Drilling Zi at 1.60/1.60 bpm C~ 3500-3600 psi, WOB 1.2K, ECD 10.5, ROP 40-50 fph, TF 60L, 69 deg incl. Drilled to 10,370'. PROD1 Drilling Z1 at 1.65/1.65 bpm ~ 3900-4100 psi, WOB 3.5K, ECD 10.6, ROP 60-80 fph, TF 45R, 78 deg incl. Drilled to 10,450'. PRODi Wiper trip to window. Hole clean. RIH clean to bottom. PROD1 Drilling Zi at 1.55/1.50 bpm ~ 4000-4200 psi, WOB 3.5K, ECD 10.6, ROP 60 fph, TF 60R, 88 deg incl. Occationally stacking weight. Drilled to 10,505'. PROD1 Drilling Z1, 1.6 / 1.6 bpm, 3200-4200 psi, 88 deg incl, 120R tt, Stacking wt, Drilled to 10,590'. PROD1 POH for lateral BHA. PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing BHA. PROD1 C/O Bit and C/O and adjust motor to 1.0 deg bend. Installed SWS CoilTrak Version 8 software in Ops cab. Installed Coil inspect system for measuring wall thickness of coiled tubing. BHA #3 OAL = 58.23'. PROD1 RIH with BHA #3 LAT BHA with HCC BC Bit #2, 1.0 deg motor and BHI MWD tools. Printed: 1/14/2008 8:58:28 AM ' A BP EXPLORATION Page 4 of 26 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: 1 ell Name: 1 e: Name: From - To ~ 5-04 5-04 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task '~~ PLET A Code ~ E NPT 'i Start Rig Rig Phase Spud Date: 3/24/1982 : 12/10/2007 End: 1/4/2008 Release: 1/4/2008 Number: N1 Description of Operations 12/14/2007 12:00 - 14:00 2.00 DRILL P PROD1 Circ at min. rate. 14:00 - 14:30 0.50 DRILL P PROD1 Log tie-in at RA tag, -10'. 14:30 - 15:00 0.50 DRILL P PROD1 RIH clean to bottom. 15:00 - 16:30 1.50 DRILL P PROD1 Drill Z1A Lateral, 1.5 / 1.5 bpm, 3300-4100 psi, 40-80 fph, 90 deg incl, 140R TF. 10.6 ecd, Stacking wt. Drilled to 10,635' 16:30 - 17:45 1.25 DRILL P PROD1 Wiper trip to window. Swap to new FloPro. RIH clean to bottom. 17:45 - 18:45 1.00 DRILL P PROD1 Drill Z1A Lateral, 1.65 / 1.65 bpm, 3400-4000 psi, 50 fph, 120R TF. Stacking weight and frequent stalls Drilled to 10664' 18:45 - 19:30 0.75 DRILL P PROD1 Wiper trip to window to see if drilling will improve. Hole clean. 19:30 - 20:45 1.25 DRILL P PROD1 Drilling Z1A lateral at 1.55/1.55 bpm C~ 3000-3300 psi, WOB 4K, ECD 10.1, ROP 15-30 fph, TF 60R, 87 deg incl. Slow drilling. Drilled to 10,690'. 20:45 - 22:15 1.50 DRILL P PROD1 Drilling Z1A lateral at 1.45/1.45 bpm C~ 3200-3500 psi, WOB 1-2K, ECD 10.1, ROP 70-90 fph, TF 110R, 90 deg incl. Drilled to 10,730'. 22:15 - 00:00 1.75 DRILL P PROD1 Drilling Z1A lateral at 1.50/1.50 bpm ~ 3000-3200 psi, WOB 1-2K, ECD 10.1, ROP 20-40 fph, TF 80R, 90 deg incl. Drilled to 10,800'. 12/15/2007 00:00 - 00:45 0.75 DRILL P PROD1 Wiper trip to window. Hole clean. 00:45 - 03:45 3.00 DRILL N DFAL PROD1 Found pinhole in coil when RIH at 10,058'. Shut down pumps, flagged pinhole, spooled pinhole back onto reel. POOH while pumping at 1 bpm. Reel had a total running footage of 662,230' when it failed. 03:45 - 04:45 1.00 DRILL N DFAL PROD1 PJSM. S/B injector. UD lateral drilling BHA #3. Bit graded 1/1/i. 2 plugged nozzles on bit. M/U nozzle to end of coil. Stab injector. 04:45 - 05:00 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for reel N2 blowdown. 05:00 - 05:45 0.75 DRILL N DFAL PROD1 Pump 10 bbls water spacer followed by 10 bbls McOH. 05:45 - 07:00 1.25 DRILL N DFAL PROD1 Slowdown reel with N2. Bleed off press to tiger tank. 07:00 - 07:45 0.75 DRILL N DFAL PROD1 Cut off CTC. M/U internal grapple. Pull test. Pull coil stub to reel. 07:45 - 08:00 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for swapping reels using bridge crane. 08:00 - 10:00 2.00 DRILL N DFAL PROD1 Lower used E-coil reel onto trailer. Pick up new 2" E-coil reel off of trailer. 10:00 - 12:15 2.25 DRILL N DFAL PROD1 New reel had a support bushing sticking out 1" to far from reel flange. Cut off 1" of support bushing on reel, to make it flush with flange. Secure reel on reel stand support and drive pins. Slip and cut 45' of drill line while working on reel bushing. 12:15 - 14:00 1.75 DRILL N DFAL PROD1 M/U hardline inside reel and M/U E-Line bulkhead. 14:00 - 18:00 4.00 DRILL N DFAL PROD1 Pull test internal grapple and pull coil into injecter. Test E-line. OK. Fill coil with double slick water. Did slack management. Pumped max rate with double slick water. E-Line did not move. Fill coil with rig water and reverse circ at max rate, 3.3 bpm at 4400 psi. E-Line moved very well. Fill coil with FloPro. Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 5 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~ Hours ~ Task Code NPT ~ Phase ~~ Description of Operations 12/15/2007 18:00 - 21:00 3.00 DRILL N DFAL PROD1 Cut Coil back to E-Line. Calibrate pipe straightener while cutting coil -set at 650 psi. Cut 30' of coil and exposed 10' of eline. With only 1.1% slack of eline in coil decided to perform slack management again. Fill coil with rig water and reverse circ at max rate, 3.3 bpm at 4400 psi. E-line moved. Rig up to reverse circ air thru coil. Blow back -5 bbls water w/air. 21:00 - 22:30 1.50 DRILL N DFAL PROD1 Cut Coil back to E-Line. Cut 10' of coil to expose E-line. E-line only moved a few feet. Coil came off roller on end of gooseneck. Had to remove stuffing box to get pinched section of coil thru injector. Cut 16' of coil. Total of 56' of coil cut and 46' of E-line cut. 22:30 - 00:00 1.50 DRILL N DFAL PROD1 M/U SLB Kendall CTC and BHI UOC. E-Line tested OK. 12/16/2007 00:00 - 01:30 1.50 DRILL N DFAL PROD1 PT CTC to 3500 psi. M/U BHI Lateral MWD BHA #4 with HCC BC Bit #2, 1 deg Xtreme motor and BHI tools. Stab injector. 01:30 - 02:00 0.50 DRILL N DFAL PROD1 RIH w/ lateral drilling BHA #4. 02:00 - 03:00 1.00 DRILL N SFAL PROD1 One of the gripper blocks came off of injector chains at 845'. Stopped to replace block and inspect injector. 03:00 - 03:30 0.50 DRILL N SFAL PROD1 POOH to surface to inspect coil for damage -okay. 03:30 - 04:45 1.25 DRILL N DFAL PROD1 RIH w/ lateral drilling BHA #4 to 7623'. 04:45 - 05:00 0.25 DRILL N SFAL PROD1 Levelwind not working correctly. Investigate problem. Need new brass pall for Levelwind. 05:00 - 05:30 0.50 DRILL N DFAL PROD1 RIH to 9702' 05:30 - 06:00 0.50 DRILL N WAIT PROD1 Wait for SLB to bring out new brass pall for Levelwind. 06:00 - 06:15 0.25 DRILL N SFAL PROD1 New part on location. Install new brass pall in Levelwind. 06:15 - 06:30 0.25 DRILL N DFAL PROD1 RIH thru window. 06:30 - 07:00 0.50 DRILL P PROD1 Log tie-in at RA tag, -7 ff. 07:00 - 07:30 0.50 DRILL P PRODi RIH clean to bottom. Tag bottom at 10,800'. 07:30 - 09:00 1.50 DRILL P PRODi Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 100R, 93 deg incl, 60 fph, 10.6 ecd, Drilled to 10888'. 09:00 - 10:40 1.67 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3000-3800 psi, 901, 93 deg incl, 70 fph, 10.3 ecd, Stacking wt. Drilled to 10,940'. 10:40 - 11:40 1.00 DRILL P PROD1 Wiper trip to window. RIH to bottom. 11:40 - 14:00 2.33 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 90L, 93 deg incl, 70 fph, 10.5 ecd, Drilled to 11040'. 14:00 - 15:00 1.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 100R, 92 deg incl, 20 fph, 10.5 ecd, Stacking wt. Drilled to 11,050'. 15:00 - 16:00 1.00 DRILL P PROD1 Wiper trip to window. RIH to bottom. 16:00 - 19:00 3.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3300-3700 psi, 2K WOB, 90R, 90 deg incl, 75 fph, 10.7 ecd, Drilled to 11,200'. 19:00 - 19:45 0.75 DRILL P PROD1 Wiper trip to window. Hole clean. 19:45 - 20:15 0.50 DRILL P PROD1 Log tie-in at RA tag, +7' correction. 20:15 - 21:00 0.75 DRILL P PROD1 RIH clean to bottom. 21:00 - 22:30 1.50 DRILL P PROD1 Drill Z1A lateral, 1.60 / 1.60 bpm, 3350-3800 psi, 3K WOB, 70R, 90 deg incl, 45-55 fph, 10.7 ecd. Drilled to 11,272'. 22:30 - 23:45 1.25 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3500-3900 psi, 1.5-2K WOB, 110R, 92 deg incl, 85-100 fph, 10.8 ecd. Drilled to 11,350'. Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 6 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date ~' From - To Hours Task Code NPT i Phase Description of Operations 12/16/2007 23:45 - 00:00 0.25 DRILL P PROD1 Wiper trip to window. 10K Overpulls at 11040', 10970'. 12/17/2007 00:00 - 01:15 1.25 DRILL P PROD1 Continue wiper trip to window. RIH to bottom. 01:15 - 03:00 1.75 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3550-3850 psi, 1.5-2K WOB, 60L, 90 deg incl, 75-100 fph, 10.9 ecd. Drilled to 11,440'. 03:00 - 04:00 1.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3600-3900 psi, 1-2K WOB, 60L, 88 deg incl, 100-125 fph, 10.9 ecd. Drilled to 11,500'. 04:00 - 05:40 1.67 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean. 05:40 - 06:00 0.33 DRILL P PROD1 Drill Zi A lateral, 1.6 / 1.6 bpm, 3750 psi, 1 K WOB, 100L, 90 deg incl, 120 fph, 11.0 ecd. Drilled to 11,538'. 06:00 - 07:40 1.67 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3300-4100 psi, 1-2K WOB, 100R, 89 deg incl, 80 fph, 11.2 ecd. Swapped to new FloPro. Drilled to 11,650'. 07:40 - 09:15 1.58 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean. Log GR tie-in. Added 7' to CTD. 09:15 - 11:20 2.08 DRILL P PROD1 Drill Z1A lateral with new FloPro, 1.6 / 1.6 bpm, 3100-3800 psi, 1-2K WOB, 90R, 93 deg incl, 100 fph, 10.5 ecd. Drilled to 11,798'. 11:20 - 13:15 1.92 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean. 13:15 - 15:45 2.50 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 120R, 94 incl, 2-3K wob, 120 fph, Drilled to 11925'. 15:45 - 16:10 0.42 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3200-3800 psi, 80L, 94 incl, 1-3K wob, 160 fph, Drilling good sand. Drilled to 11,960'. 16:10 - 17:40 1.50 DRILL P PROD1 Wiper trip to window. RIH to bottom. Hole clean. 17:40 - 18:45 1.08 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3350 psi, 90L, 92 incl, 1-2K wob, 30-50 fph, 10.7 ECD. Drilled to 12,020' 18:45 - 20:45 2.00 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3600-3900 psi, 180L, 91 incl, 2-3K wob, 60-80 fph, 11.0 ECD. Drilled to 12,100' 20:45 - 23:15 2.50 DRILL P PROD1 Wiper trip to window. Log GR tie-in. +10' correction. RIH to bottom. Hole clean 23:15 - 00:00 0.75 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3500-3800 psi, 15L, 94 incl, 1-2K wob, 30-50 fph, 10.9 ECD. Drilled to 12,130' 12/18/2007 00:00 - 01:30 1.50 DRILL P PROD1 Drill Z1A lateral, 1.6 / 1.6 bpm, 3400-3800 psi, 60L, 94 incl, 1-2K wob, 10-20 fph, 10.8 ECD. Stacking weight, hard to make any hole. Drilled to 12,141' KICK WHILE DRILLING DRILL 0100 HRS 01:30 - 05:00 3.50 DRILL P PROD1 POOH to P/U Agitator. 05:00 - 06:30 1.50 DRILL P PROD1 PJSM. S/B injector. L/D lateral drilling BHA #4. Bit had 3 plugged nozzles on pilot. Meanwhile SLB installed CT inspect. 06:30 - 07:30 1.00 BOPSU P PROD1 Jet stack with swizzle stick. Function test BOPE, weekly test. 07:30 - 07:40 0.17 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for making up the drilling BHA. 07:40 - 08:30 0.83 DRILL P PROD1 M/U BHI LAT BHA #5, with HCC BC Bit #4, 1.0 deg Xtreme Printed: 1/14/2008 8:58:28 AM • ~ BP EXPLORATION Page 7 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours I Task Code NPT Phase Description of Operations 12/18/2007 ~ 07:40 - 08:30 0.83 DRILL P PROD1 motor, Agitator and BHI tools. 08:30 - 09:45 1.25 DRILL P 09:45 - 10:30 0.75 DRILL C 10:30 - 12:00 1.501 DRILL l C OAL = 66.08'. Check SWS coil inspect tool, working OK. Open EDC PROD1 RIH with BHA #5, circ at minimum rate. Stop at 4600'. PROD1 POH with Lateral BHA. PROD1 12:00 - 16:00 4.00 DRILL ~ X ~ SFAL PROD1 16:00 - 16:15 0.25 DRILL C PROD1 16:15 - 18:15 2.00 DRILL X SFAL PROD1 18:15 - 19:10 0.92 DRILL C PRODi 19:10 - 19:25 0.25 DRILL C PROD1 19:25 - 21:00 1.58 DRILL C PRODi 21:00 - 21:10 0.17 DRILL C PROD1 21:10 - 22:15 1.08 DRILL C PROD1 22:15 - 22:55 I 0.671 DRILL I C I I PROD1 22:55 - 23:30 0.58 DRILL C PRODi 23:30 - 00:00 0.50 DRILL C PROD1 12/19/2007 ~ 00:00 - 01:15 ~ 1.25 ~ DRILL ~ C ~ ~ PROD1 01:15 - 01:45 ~ 0.501 DRILL ~ C ~ ~ PROD1 01:45 - 02:30 ~ 0.75 ~ DRILL ~ C ~ ~ PROD1 02:30 - 03:00 0.50 DRILL C PROD1 03:00 - 04:00 1.00 DRILL C PROD1 04:00 - 04:30 I 0.501 DRILL I C I I PROD1 Change in well plan. Asset would like to open hole sidetrack well at 10,270', to access reserves earlier in the polygon. Lay out Lateral drilling BHA #5. M/U Open hole sidetracking BHA #6, with HCC R60 sidetracking bit #5 Brass guide basket and 1.9 deg Xtreme motor. P/U to stab injector. Off driller side of spreader bar from bridge crane in reel house spooled down and came into contact w/ the coil reel. Investigate cause of incident w/ Herb Williams, BP HSE advisor. See remarks section Respooled bridge crane winches and secured spreader bar with chains and beam clamps. PJSM. Stab injector. When stabbing coil into BHA, UOC caught edge of LOC and was damaged. S/B injector. Replace Flow Sub, LOC, and UOC housing. E-line tested good. RIH to 2781'MD Change Packoffs on SLB injector RIH 95 fpm, Flow in=0.4, Flow out=0.6, PVT=247 Tie-in at RA tag, -11' correction RIH through window, try to knock brass cone from bit ~ 10,738 by orienting 180 out from as-drilled TF. 1.6 bpm in, 1.6 bpm out, 3560 psi circulating pressure. IA=40 psi, OA=11 psi. PVT = 269. Cont RIH to 11350 at 180 out trying to see motor work or DWOB. No luck. RIH to bottom to knock off brass ring at 50 fpm. Tag bottom, good stall. Assume ring is now gone. Pull up hole to sidetrack point at 50 fpm. 1.5 bpm, 3280 psi. Park at 10. 270 MD, paint flag, PUH/backream at 50 fph to 10,250 MD, StrWt 26,630#, 1.5 bpm in, 1.5 bpm out, Cir press 3450 psi, PVT=247, IA=46psi, OA=31 psi Ream 10235' - 10,270' 20fph, 1.5 bpm in, 1.5 bpm out, cir press 3362 psi, Str wt 11690 Ibs, PVT = 242, IA =48 psi, OA= 42 psi 30' trough up at 50 fph, trough only 10' and already showing 10 deg drop on inclination from parent well. Decide to go ahead and drill ahead rather than trough. Start drilling ahead at 12,271'MD at 8 fph, TF 130R. 1.5 bpm in, 1.5 bpm out, cir press 3406, Str wt 9935 Ibs. DWOB 2.77K-Ibs, PVT = 240, IA = 51, OA=63. Drilling TF 90R, 8 fph, 1.5 bpm, 10,276'MD-10,280'MD, DWOB = 0.5K Ibs Drilling TF 30R, 13 fph, 1.5 bpm, 10,276'MD-10,280'MD, DWOB = 0.6K Ibs Drilling TF 20R, 18 fph, 1.5 bpm, 10,280'MD-10,300'MD PVT= Printed: 1/14/2008 8:58:28 AM ~ ~ BP EXPLORATION Page 8 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/19/2007 04:00 - 04:30 0.50 DRILL C PROD1 215, IA=52 psi, OA = 90 psi, DWOB = 0.7K Ibs, cir press = 3450 psi 04:30 - 06:45 2.25 DRILL C PROD1 POOH for 2.3 deg motor to finish build and land well 06:45 - 07:00 0.25 DRILL C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for UD open hole sidetrack BHA and M/U drilling build BHA. 07:00 - 07:15 0.25 DRILL C PROD1 S/B injector. UD open hole sidetrack BHA #6. 07:15 - 08:00 0.75 DRILL C PROD1 M/U drilling build BHA #7 with HCC BC Bit #6, 2.3 deg Xtreme motor and BHI tools. Stab injector. 08:00 - 10:45 2.75 DRILL C PROD1 RIH w/drilling build BHA. Tie-in at RA Tag. -11' correction. RIH to bottom. 10:45 - 11:30 0.75 DRILL C PROD1 Drilling build at 1.5/1.5 bpm ~ 3700-4100 psi, WOB 1.5-2K, ECD 10.8, ROP 50 fph, TF 15R, 51 deg incl. Stacking weight. Drilled to 10,330'. 11:30 - 12:00 0.50 DRILL C PROD1 Backream to 10220' at 2.6 fpm, 1.6 / 1.6, 3700 psi. 12:00 - 13:00 1.00 DRILL C PRODi Drilling build at 1.6/1.6 bpm ~ 3700-3900 psi, WOB 1.5-2K, ECD 10.8, ROP 40-80 fph, TF 15R, 60 deg incl. Drilled to 10,358'. 13:00 - 15:45 2.75 DRILL C PROD1 Not getting enough dogleg to land at planned 8,867' TVD. With current doglegs we are projected to land in shale at 8,880'. Decided to POOH for higher bend motor. 15:45 - 16:15 0.50 DRILL C PROD1 S/B injector. UD drilling build BHA #7. 16:15 - 17:15 1.00 DRILL C PROD1 M/U drilling build BHA #8 with HCC BC Bit #7, 2.7 deg Xtreme motor and BHI tools. Overall BHA length = 58.23'. Stab injector. 17:15 - 19:00 1.75 DRILL C PROD1 RIH w/drilling build assembly w/ 2.7 deg motor. 0.26 in/0.61 out, 100 fpm 19:00 - 19:24 0.40 DRILL C PROD1 Close EDC at 9753' MD, Tie-in at RA tag. -10 correction. 19:24 - 19:46 0.37 DRILL C PROD1 RIH open hole, no problems at window or sidetrack point with 2.7 deg motor. 19:46 - 22:15 2.48 DRILL C PROD1 Drill from 10,358- 10,455, Cir Press = 3859 psi, 1.5 in/1.5 out, PVT= 214 (begin mud swap to new flo-pro), AP=4958 psi, DWOB=2.5K Ibs, Str Wt 10,540 Ibs -Landed 12' low, significantly less DLS than expected from 2.7 deg bend motor. 22:15 - 00:00 1.75 DRILL C PROD1 At 10,455' MD -POOH for lateral BHA, New mud, PVT 302 bbl, 1.8 in/1.7 out, Cir Press = 3512 psi 12/20/2007 00:00 - 00:30 0.50 DRILL C PROD1 POOH for 1.1 degree motor 00:30 - 00:45 0.25 DRILL C PROD1 PJSM for BHA handling and cutting 100' coil 00:45 - 01:30 0.75 DRILL C PROD1 Lay down CoilTrak, remove CT connector 01:30 - 02:45 1.25 DRILL C PRODi Cut 100' of Coil, circulate coil 02:45 - 03:45 1.00 DRILL C PRODi Makeup CT connector 03:45 - 04:45 1.00 DRILL C PROD1 Begin reheading, coil frozen, put boot on Eline, RIH to unthaw coil, circulate, POOH 04:45 - 05:30 0.75 DRILL C PROD1 Rehead Baker UOC 05:30 - 06:30 1.00 DRILL C PRODi MU CoilTrak BHA #9 w/ bit #8/Stab onto well 06:30 - 07:15 0.75 DRILL X DFAL PROD1 BHI tools testing abnormally on surface. S/B injector. C/O orienter and DGS sub. 07:15 - 07:30 0.25 DRILL X DFAL PROD1 M/U BHI lateral drilling BHA. Stab injector. 07:30 - 10:30 3.00 DRILL C PROD1 RIH w/ lateral drilling BHA #9. Tie in at RA tag. -11.5' correction. RIH clean to bottom. 10:30 - 12:00 1.50 DRILL C PROD1 Drill lateral, 1.55 / 1.55 bpm, 3300-3600 psi, 90L, 96 incl, 2-2.5K wob, 100-125 fph, 10.2 ECD. Printed: 1/74/2008 8:58:28 AM ~ ~ BP EXPLORATION Operations Summary Report Page 9 of 26 ',Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours II Task Code NPT Phase Description of Operations 12/20/2007 10:30 - 12:00 1.50 DRILL C PROD1 Drilled to 10 538' 12:00 - 12:30 0.50 DRILL C PROD1 Drill lateral, 1.55 / 1.55 bpm, 3500-3800 psi, 120L, 94 incl, 2-3K wob, 150 fph, 10.3 ECD. Drilled to 10,610' 12:30 - 13:15 0.75 DRILL C PROD1 Wiper trip to window. Hole clean. RIH clean to bottom. 13:15 - 14:15 1.00 DRILL C PROD1 Drill Z1A lateral, 1.55 / 1.55 bpm, 3600-3850 psi, 90R, 93 incl, 2-3K wob, 130-150 fph, 10.3 ECD. Drilled to 10,750' 14:15 - 15:10 0.92 DRILL C PROD1 Wiper trip to window. Hole clean. RIH clean to bottom. 15:10 - 16:30 1.33 DRILL C PROD1 Drill Z1A lateral, 1.5 t 1.5 bpm, 3300-3700 psi, 120R, 93 incl, 2-3K wob, 30-80 fph, 10.4 ECD. Drilled to 10,801' 16:30 - 18:00 1.50 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3400-4000 psi, 30R, 93 incl, 1-2K wob, 10-20 fph, 10.4 ECD. Stacking weight, hard drilling. Drilled to 10,809' WELL KILL DRILL 1730 HRS 18:00 - 21:13 3.22 DRILL C PROD1 Drilling on hard spot 10809 - 10840 MD, ROP = 11 fph, still getting good motor work. 3300 psi, PVT=302, 90R, 10.4 ECD. Bad spot in coil here, drill with minimal DWOB = 0.7K. Gamma-ray 120 API Shale 21:13 - 22:30 1.28 DRILL C PROD1 Drilling 10840 - 10860 MD, ROP 30 fpr Free spin 3100 psi, Drilling 3420 psi, PVT= 310, 1.53 in/1.53 out, Gamma-ray 70 API sand 22:30 - 00:00 1.50 DRILL C PROD1 Drilling 10,860 - 10,885 ROP 22 fph, Free spin 3100 psi, Drilling 3320 psi, PVT= 304, 1.5 in/1.5 out, DWOB 2K, IA=57, OA=129 12/21/2007 00:00 - 00:40 0.67 DRILL C PROD1 Wiper trip to window 00:40 - 01:10 0.50 DRILL C PROD1 Tie-in to RA tag +2' correction, RIH 1.4in / 1.53 out, PVT 297 bbl. 01:10 - 01:50 0.67 DRILL C PROD1 Drilling 10,885 -10,889'MD, Stacking, stalling, slow ROP <10fpr, 3490 psi, 1.6in / 1.59 out, PVT = 294bb1s, IA=60, OA=139 01:50 - 04:35 2.75 DRILL C PROD1 Drilling 10,889' MD - 11,039' MD, 70-100 fph, 3800 psi, 1.6in/1.60out, PVT=292bb1s, IA=60, OA=148, DWOB = 1 K, ECD=10.76, Inc= 95 deg, TF=150R, ECD=10.8#/gal, Gamma-ray=55 API 04:35 - 06:00 1.42 DRILL C PROD1 Wiper trip to window -clean 06:00 - 07:30 1.50 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3400-3600 psi, 160R, 93 incl, 2.5-3.5K wob, 10 fph, 10.7 ECD. Drilled to 11,052' 07:30 - 10:00 2.50 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-3800 psi, 120R, 90 incl, 1.5-2K wob, 60-80 fph, 10.7 ECD. Drilled to 11,125' 10:00 - 11:45 1.75 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3600-3800 psi, 110L, 87 incl, 1.5K wob, 60-80 fph, 10.8 ECD. Drilled to 11,198' 11:45 - 13:15 1.50 DRILL C PROD1 Wiper trip to window. RIH to bottom. Hole clean. 13:15 - 15:00 1.75 DRILL C PROD1 Drill Z1A lateral, 1.5 / 1.5 bpm, 3600-3700 psi, 50R, 87 incl, 4-5K wob, 5-10 fph, 10.8 ECD. Getting some motor rubber over shakers. Pump 30 bbls high vis pill. Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 10 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date 'From - To II Hours Task Code NPT Phase Description of Operations 12/21!2007 13:15 - 15:00 1.75 DRILL C PROD1 Drilled to 11,210' 15:00 - 17:45 2.75 DRILL X DFAL PROD1 POOH to check motor and bit. 17:45 - 18:00 0.25 DRILL X DFAL PRODi S/B injector. UD lateral drilling BHA #9. 18:00 - 20:00 2.00 DRILL X DFAL PRODi PJSM, Change out bit (Id HCC/pu Hycalog), motor and PU agitator, drop dual checks in UOC, circulate through bung hole entire time out of the hole at 0.5 bpm 20:00 - 21:30 1.50 DRILL X DFAL PRODi RIH at 83 fpm, .2 in/ .64 out, PVT = 217 bbl 21:30 - 22:15 0.75 DRILL X DFAL PROD1 Kick While Tripping Drill/Tie-in at window, PVT = 253, -10' correction 22:15 - 23:00 0.75 DRILL X DFAL PROD1 RIH from window 9806' MD, 30 fpm, .33in/.43out, 1700 psi, PVT=254, slight bobble at 10,285', otherwise very clean 23:00 - 23:15 0.25 DRILL C PROD1 Drill 11,210' MD, PVT=256 bbl, 1.3in/1.3out, 4050 psi, IA=60, OA=82, Str Wt=11,212 Ibs, ""Pressure too high for flow rate, circulate, dropped 500 psi suddenly""" 23:15 - 23:25 0.17 DRILL C PROD1 Precautionary 200' wiper to assure if blew something through bit we have it moving up hole past the BHA 23:25 - 00:00 0.58 DRILL C PROD1 Tag bottom to start drilling, freespin 3900 psi, pressures came up again, pull up hole, DeltaP across BHA drops from 1300 psi to 1000 psi at same flow rate, go back to bottom 12/22/2007 00:00 - 00:20 0.33 DRILL C PROD1 RIH 1.5in/1.5out 00:20 - 01:00 0.67 DRILL C PROD1 Drilling 11,213' - 11,221'MD -Cir pressures normal now, delta P across BHA=900psi, Cir Prss=3995 psi,l.3in/1.3out, PVT=252, Cir pressure(and downhole delta P) sometimes increases 400psi. 01:00 - 03:00 2.00 DRILL C PROD1 Drilling 11,221' MD, delta P seems to be stabilizing at 800 psi free spin, DH vibration -active now, ROP good increases to 63 fph, appears agitator was locking up, but now appears stable. Cir Press = 4500 psi, 1.4in/1.4out, PVT=250, DWOB 1.8K, 91 deg inclination 03:00 - 04:30 1.50 DRILL C PROD1 Drilling 11,286- 11,321 MD, agitator has periods of not working, worked for 55' then quit, Cir Press = 4285, 1.4in/1.4out, DWOB = 3.5K, ROP = 45 fph, Start mud swap, ECD = 11.0 04:30 - 05:15 0.75 DRILL C PROD1 Drilling 11,321 - 11,350, New mud to surface, Cir Press 3770 psi, 1.45 in/1.42out, DWOB 2.7K, ROP 60 fph, ECD=10.2 05:15 - 06:45 1.50 DRILL C PROD1 Wiper trip to window, Cir Press=3582 psi, 1.6 in/1.4 out, PVT=295 bbl 06:45 - 07:45 1.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-3700 psi, 90R, 89 incl, 1-2K wob, 55-80 fph, 10.2 ECD. Drilled to 11,420' 07:45 - 09:45 2.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3500-4000 psi, 100L, 90 incl, 1-3K wob, 30-90 fph, 10.3 ECD. Drilled to 11,500' 09:45 - 11:30 1.75 DRILL C PROD1 Wiper trip to window. RIH to bottom. Hole clean. 11:30 - 13:00 1.50 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3300-4000 psi, 150L, 91 incl, 1.5-3K wob, 80-100 fph, 10.3 ECD. Drilled to 11,570' ~ 13:00 - 14:00 1.00 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3400-3800 psi, 150L, 92 incl, 1.5K wob, 100 fph, 10.3 ECD. Drilled to 11,650' 14:00 - 16:10 2.17 DRILL C PROD1 Wiper trip to window. 10K overpulls at 11,240' and 11080'. Tie-in to RA tag. +11' correction. RIH clean to bottom. 16:10 - 18:00 1.83 DRILL C PROD1 Drill Z1A lateral, 1.4 / 1.4 bpm, 3400-3900 psi, 30L, 97 incl, Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 11 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours 'I Task Code NPT Phase Description of Operations 12/22/2007 16:10 - 18:00 1.83 DRILL C PROD1 1-3K DWOB, 60-100 fph, 10.4 ECD. Drilled to 11,740' 18:00 - 19:15 1.25 DRILL C PROD1 Drilling Z1A lateral to 11,800 MD 19:15 - 21:21 2.10 DRILL C PROD1 Wiper trip to window. 3K overpull at 11,300', 10,850' and 10K overpull 11000'. RIH clean to bottom. 21:21 - 22:20 0.98 DRILL C PROD1 Drilling at 11,800 - 11,907MD, 1.5 / 1.5, 4100 psi, 60L, 1.5 DWOB, 10.7 ECD, Str Wt 10,950 lbs., ROP 85 fph 22:20 - 22:45 0.42 DRILL C PROD1 Drilling Z1A lateral 11,907-11,932'MD, 1.4 / 1/4, 4000 psi, 1.5, PVT=277, 1.5 DWOB, 10.8 ECD, Str Wt. 10,750 22:45 - 00:00 1.25 DRILL C PROD1 Work pipe, acts like differential sticking, drilling at 11,932'MD 12/23/2007 100:00 - 00:15 I 0.251 DRILL I C I I PROD1 00:15 - 01:30 1.251 DRILL C PROD1 01:30 - 02:25 0.92 DRILL C PROD1 02:25 - 03:25 1.00 DRILL C PROD1 03:25 - 04:25 1.00 DRILL C PROD1 04:25 - 06:45 2.33 DRILL C PROD1 06:45 - 07:30 0.75 DRILL C PROD1 07:30 - 11:00 3.501 DRILL P PROD1 11:00 - 12:15 1.25 DRILL P PROD1 12:15 - 13:00 0.75 DRILL N RREP PROD1 13:00 - 15:00 2.00 DRILL P PROD1 15:00 - 16:00 1.00 DRILL P PROD1 16:00 - 20:00 4.00 BOPSU P PROD1 20:00 - 22:15 2.25 BOPSU P PROD1 22:15 - 23:15 1.00 DRILL P PROD1 23:15 - 00:00 0.75 DRILL P PROD1 12/24/2007 100:00 - 01:45 I 1.751 DRILL I P I I PROD1 when motor work drilled off while trying to add weight, unable to pickup. Work pipe to 65K up and down 15 minutes, freed. Drilling 11,932-11,937' MD, 1.4in/1.4out, 4250 psi, PVT=275, IA=66, OA=211, Str Wt 11,936 Ibs, ECD 10.7, acts like differential sticking. Wiper trip to window, precautionary for hole cleaning and differential sticking, 1.3in/1.3out, 3200 psi, 10.4 ECD at window, Tie-in at RA tag, +11' correction, No overpulls RIH, 1400 psi, .3in/.3out, 10.0 ECD Drill 11,948'-12,031 MD, 1.4in/1.4out, 4140 psi, PVT=260, IA=66, OA=210, StrWt 11,9521bs, ECD=10.84, DWOB=I.8K, 110 fph Drill 12,031' - 12,106'MD, 1.3in/1.3out, 3800 psi, PVT=256, IA=66, OA=212, Str Wt 12,060 Ibs Wiper trip to window 3400 psi, 1.3 in/1.15 out coming OOH, ECD 10.7, Str Wt = 12,069 Ibs up, 1.1 in/1.3 out when RIH Drill Z1A lateral, 1.2 / 1.2 bpm, 3800-4100 psi, 120L, 89 incl, 1-2K wob, 90-100 fph, 10.9 ECD. Drilled to 12,140' Drill Z1A lateral, 1.2 / 1.2 bpm, 3800-4200 psi, 90R, 87 incl, 2-3K wob, 10-30 fph, 11.1 ECD. Stacking weight, hole sticky. Agitator does not seem to be working properly. Swap hole over to new Flo-Pro. Drilled to 12,224' Wiper trip to window. Hole clean. Pull up thru window and park coil in casing. Bob Sleightam w/ Sawyer Systems testing reel house bridge cranes after making safety alterations to hydraulic system. Bridge crane tests okay. POOH to surface to C/O Agitator. Lost communication w/ MWD tools S/B injector. Meg test E-line -okay. L/D lateral drilling BHA #10. Bit graded 1/1/i. Bit was balled. Pressure and function test ROPE - 250 psi low - 3500 psi high. Test witness waived by AOGCC inspecter, Chuck Scheeve. Send test report to AOGCC. Continue testing BOPE. Open Master, Check Pressure, well on slight vac, PJSM for BHA pick up, check pipe straightener RIH Straightening 8000' of coil. PVT = 259, IA=45, OA=17, Tubing Speed 83 fpm, .3in/.4out RIH straightening coil 77 fpm, PVT=274, Returns started at 3 Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 12 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase it Description of Operations 12/24/2007 00:00 - 01:45 1.75 DRILL P PROD1 bbls, .34in/.61out, 1100 psi 01:45 - 01:55 0.17 DRILL P PROD1 Tie-in at RA tags, -8' correction 01:55 - 02:30 0.58 DRILL P PROD1 Run into open hole, 37 fpm, 1600 psi, .48in/.59out, IA=49, OA=2, ECD=9.7, PVT = 308 at window 02:30 - 03:00 0.50 DRILL P PROD1 Tag w/ slight motor work at 11,036'MD, RIH 35 fpm, .45in/.55out, 1549psi, 9.85=ECD 03:00 - 04:40 1.67 DRILL P PROD1 Drilling 12,224'-12,290' MD ,Agitator quit working at 04:40 - 05:40 1.00 DRILL P PROD1 05:40 - 06:10 0.50 DRILL P PROD1 06:10 - 08:40 2.50 DRILL P PROD1 08:40 - 09:30 0.83 DRILL P PROD1 09:30 - 11:30 2.00 DRILL P PROD1 11:30 - 15:30 4.00 DRILL P PROD1 15:30 - 16:45 1.25 DRILL P PRODi 16:45 - 18:15 1.50 DRILL P PROD1 18:15 - 19:30 1.25 DRILL P PROD1 19:30 - 21:15 1.75 DRILL P PRODi 21:15 - 23:15 2.00 DRILL P PROD1 23:15 - 00:00 0.75 DRILL P PROD1 12/25/2007 00:00 - 00:15 0.25 DRILL P PROD1 00:15 - 00:55 0.67 DRILL P PROD1 00:55 - 01:10 0.25 DRILL P PROD1 01:10 - 01:20 0.17 DRILL P PROD1 01:20 - 01:50 0.50 DRILL P PROD1 01:50 - 02:15 0.42 DRILL N DPRB PROD1 12,260'MD, PVT=303, 1.4in/1.4out, 3600psi, ECD = 10.66, IA=50, OA=23, DWOB 2-4KIbs Drilling 12,290'MD - 12,323 MD, PVT=294, 1.4in/1.36out, 4200psi, ECD= 10.75, IA= 55, OA=39, Str Wt=12,2941bs Drilling 12,323 MD - 12,357' MD ,PVT=291, 1.4in/1.33out, 3800psi, ECD= 10.56, IA= 56, OA=49, Str Wt=12,3001bs Wiper trip to window. Hole clean. RIH to bottom. Set down at 11190', 11280', P/U and run thru. Drill Z1 A lateral, 1.4 / 1.4 bpm, 3900-4200 psi, 60L, 86 incl, 1-2K wob, 80-115 fph, 10.7 ECD. Drilled to 12,415' Drill Zi A lateral, 1.45 / 1.35 bpm, 4000-4250 psi, 90L, 93 incl, 1-2K wob, 60-90 fph, 10.9 ECD. Hole getting differentially sticky. Losses at 5 bbls/hr. Drilled to 12,500' Wiper trip to window. Having trouble getting thru shale section around 11,350'. Ratty hole between 11200'-11350', worked pipe to get thru. Tie-in at RA tag, +15' correction.RlH to bottom. Ratty from 11210'-11360' Drill Z1 A lateral, 1.4 / 1.4 bpm, 4000-4300 psi, 120L, 93 incl, 1-2K wob, 60-115 fph, 10.8 ECD. Some differential sticking. Drilled to 12,580'MD Drill Z1 A lateral, 1.4 / 1.4 bpm, 3900-4300 psi, 90L, 92 incl, 1-2K wob, 50-80 fph, 10.8 ECD. Hole sticky. Losses have slowed. Drilled to 12,650'MD Wiper trip to window, 1.4in/1.2out, 3660 psi, 35 fpm up, IA=62, OA=143, 10.8 ECD, PVT=243 RIH 1.2in/1.3out, 3350 psi, 28 fpm, PVT=231, Tag hard at 11,190'- 11,200'MD, Bobble /motor work 11,300'MD Drilling 12,650' - 12,750'MD, 55 fph, 4300psi, 1.3in/1.3out, PVT=235, 11.0 ECD Drilling 12,750'-12,790'MD, 25 fph, 4200, 1.3in/1.3out, PVT=227, 11.1 ECD Drilling 12,970' - 12,800'MD, 4300psi, 1.3in/1.3out, PVT=225, ECD=11.0 500' Wiper trip Drilling 12,800' - 12,815'MD, 3400 psi, 1.3in/0 out, lost all returns PVT = 195, ~"'8.6 ECD"" Circulate and monitor well - no returns Drilling 12,815'-12,855'MD call TD, Drilled for cuttings to help losses, PVT = 150 bbls, 9.82 ECD, 1.3 in/ 0 out Pull up to the shoe and wait for mud and prepare for a Form-a-Squeeze pill, PVT=137, 3280 psi, 9.9 ECD, 1.36 in/0 out Printetl: 1/14/2008 8:58:28 AM BP EXPLORATION Page 13 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~ Hours Task 'Code' NPT '~ Phase ' Description of Operations 12/25/2007 02:15 - 02:45 0.50 DRILL N DPRB PROD1 Cont POOH 11,440'MD, PVT = 85, 2200 psi, .84 in/.14 out, 11,255'MD, 10k overpull 02:45 - 03:30 0.75 DRILL N DPRB PROD1 POOH at 10,782'MD to window, gamma tie-in, +17 correction, pulling clean, PVT=82, 2200 psi, .84in/.12 out 03:30 - 06:00 2.50 DRILL N DPRB PRODi Circulate above window at 9670'-9425'MD, 1622psi, .52in/.1out, PVT=119, Mixing Form-A-Squeeze pill, moving coil at 12 fpm 06:00 - 08:00 2.00 DRILL N DPRB PROD1 Circulate 9440'MD, moving coil at 13 fpm, crew change, mixing 40bb1 Form-A-S ueeze 30 hi vis ill taking on new 8.5ppg Flo-Pro mud to pits 08:00 - 09:00 1.00 DRILL N DPRB PROD1 RIH, tagged btm at 12865', corrected depth, with TF aligned as drilled at .53/.35bpm, 1575psi, Dn Wt 13.7k, slight bobbles of 2-3k down at 11250' and 11385', started pumping form-a-squeeze pill down hole at 11700', increase pump rate to .80/.62bpm, 1850psi, ECD 9.75ppg 09:00 - 10:20 1.33 DRILL N DPRB PROD1 POH to 9250', Up wt 31.7k, .86/.56bpm, 1750psi, ECD 9.49ppg, 10k overpull at at 11250', lay-in 23 bbls of form-a-squeeze pill followed by 35bbls of Flo-Vis pill at .80bpm, 2380 si, 10:20 - 11:55 1.58 DRILL N DPRB PROD1 Shut in well, squeeze form-a-set pill into formation maintaining 100psi, bumping up pressure in 100psi increments to 500psi~ erform s ueeze with um #1 Time Bbls Pumped Squeeze Pressure Pressure Dropped 1050 2.0 200 100 1100 .7 300 200 1110 2.0 400 300 1125 2.0 500 400 1150 open well Pump #1 rheostat is uncontrollable when bring pump #1 online while both pumps switches are online, problem seems to be with pump switch on console in ops cab, switch #2 pump to lock out position on console, Mike Schick, Nordic #2 electrician, called out to troubleshoot 11:55 - 13:30 1.58 DRILL N PROD1 RIH, wash down to 12700', 1.33/1.31 bpm, 3525psi, started pumping liner pill at 11500' 13:30 - 16:30 3.00 DRILL P PROD1 POH to BHA #11, I~r-in,30bb1 liner pill with 3ppb alpine beads,_ .90/.52bpm, 2350psi, Up wt 31.5k, monitor well above window at 9250', hole stable 16:30 - 17:15 0.75 DRILL P PROD1 POH, LD BHA #11, bit grade 1-1- I, balled up, installed a-line boot Lost total of 300 bbls since loses begin 17:15 - 18:00 0.75 DRILL P PROD1 MU, RIH with swizzle stick across wellhead and stack, flush out stack and surface lines 18:00 - 20:30 2.50 P RUNPRD CTD storage mitigation: Pump 50 bbls fresh water, pump 10 bbls of inhibited water 9 Printed: 1/14/2008 8:58:28 AM 1 ~ BP EXPLORATION Operations Summary Report Legal Well Name: 15-04 Page 14 of 26 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours I _~ Task --- - Code -- 12/25/2007 18:00 - 20:30 2.50 P 20:30 - 21:30 1.00 P 21:30 - 23:00 1.50 P 23:00 - 00:00 1.00 P 12(26!2007 00:00 - 01:00 01:00 - 01:20 01:20 - 02:00 02:00 - 02:55 02:55 - 03:15 03:15 - 05:15 1.00 RIGU P 0.33 RIGU P 0.67 RIGU P 0.92 RIGU N 0.33 CASE P 2.00 CASE P 05:15 - 05:40 0.42 CASE P 05:40 - 08:00 2.33 CASE P 08:00 - 08:15 0.25 CASE P 08:15 - 10:30 2.25 CASE P 10:30 - 11:30 ( 1.001 CASE ~ P 11:30 - 12:00 0.50 CASE C 12:00 - 12:30 0.50 CASE C 12:30 - 15:15 2.75 CASE C 15:15 - 15:30 0.25 CASE C 15:30 - 15:45 0.25 CASE C 15:45 - 16:45 1.00 CASE C 16:45 - 18:00 1.25 CASE C 18:00 - 19:30 1.50 CASE C 19:30 - 21:10 1.67 CASE C 21:10 - 22:20 ~ 1.17 ~ CAS E i C NPT Phase Description of Operations RUNPRD (mixed in pill pit 10 bbls of fresh water with 10 gallons of corrosion inhibitor, M-I producti KI-3882), pump 10 bbb{s of methanol water, blow down reel with N2 C~? 1500scfm intial rate of 2bbl/min liquid out -8-10minutes. All returns to tiger tank RUNPRD Unstab injector, open well, fill well with 7.5 bbl -862' or 385 psi hydrostatic pressure loss RUNPRD Secure coil end onto reel, lower reel, position reel onto semi trailer RUNPRD Bring in E-free coil, crane up to reel house, secure and plumb into reel manifold RUNPRD ~ Continue to plumb in Efree coil into reel house manifold RUNPRD Install internal grapple into Efree coil end, pull test, pull across pipeshed, stab into injector RUNPRD Ri u to run liner WAIT RUNPRD Wait. Changed plans for welding on coil connector and pumping coil volume from before picking up liner until after picking up liner. Baker arrived within 2 hour notice. RUNPRD MU Shoe track RUNPRD PU 2-3/8" liner- drift first 5 connections, continue to PU 60 jts of 2-3/8" 4.7# L-80 STL liner with cemtralizers, MU torque 1100-1200ft-Ibs RUNPRD Fill pipe RUNPRD Continue picking up 2-3/8" liner, RIH with 101 jts and shoe track RUNPRD PJSM on RU head pin and 1" line while welding on SLB CTC RUNPRD RU circ head and 1" line, brk circ, stage pumps up to 3.7/2.5 bpm, 2022psi, monitor loses at 60 bph, Discussed with Anch office to POH and prep to run Baker IBP Welded on SLB CTC, pull test 30k RUNPRD RU ball catcher sub, circ 5 bbls, test CTC and surface lines to inner reel valve, install and pump volume dart, calculated vol 40.5bbls on 14625' of 2" CT, actual vol was 41.2bbls, RD ball catcher sub, retrieved dart. RUNPRD RU Circ head, mix 9.6ppg KCL slug RUNPRD Pump dryjob, RD circ head RUNPRD POH dry, rack back 50 stds of 2 3/8" liner, LD 1 jt of 2 3/8" liner and 2 3/8" shoe track with 1 jt of 2 3/8" liner, hole static RUNPRD PJSM on handling and MU of IBP Assy RUNPRD RU rig floor to run IBP Assy RUNPRD PU, MU IBP assy #13 w/ 2 3/8" index guide shoe, 3 joints of 2 3/8" 4.7# L-80 STL with cementralizers, Baker 2 1/8" IBP, Hyd R(r, Screen Sub, inflstion Valve, MHA, SLB Weldon CTC, OAL 117.53', stab inj RUNPRD RIH with IBP Assy #13, .15/.36bpm, 645psi at 75fpm -4000' RUNPRD RIH to window with IBP, .15/.36 bpm, 700 psi at 75 fpm RUNPRD RIH to open hole with IBP, .15/.30 bpm 850 psi at 68 fpm, small bobbles at 10,400 MD, 11,229 MD, 11,342MD ""hole in good condition""' RUNPRD Ta bottom at 12,876', Flag Pipe, Pump 10 bbls 2% KCL from pill pit, shut down pump, Drop ball, zero In Total, Pump 5 bbls Printed: 1/14/2008 8:58:28 AM ~' BP EXPLORATION Page 15 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours I Task. C -- - -_ I _-- -- 12/26/2007 21:10 - 22:20 1.171 CASE C 22:20 - 22:50 I 0.501 CASE I C 22:50 - 23:10 I 0.331 CASE I C 23:10 - 00:00 ~ 0.83 ~ CASE ~ C 12/27/2007 00:00 - 01:00 1.00 LCR C 01:00 - 01:50 0.83 LCR C 01:50 - 02:30 0.67 CASE C 02:30 - 03:30 1.00 CASE C 03:30 - 05:30 2.00 CASE C 05:30 - 06:15 0.75 CASE C 06:15 - 07:45 1.50 ~ CASE ~ P 07:45 - 09:00 1.25 CASE P 09:00 - 09:50 0.83 CASE P Spud Date: 3/24/1982 Start: 12/10/2007 End: 1/4/2008 Rig Release: 1/4/2008 Rig Number: N1 NPT Phase Description of Operations RUNPRD 2% KCL, pump switch to pits for flo-pro Q 1.7 in/1.2 out, slow rate at 29 bbls, .sin/.40out, 1150 psi, aluminum ball seats at 42 bbls/release (coil volume 41.2) RUNPRD Kill pumps, wait for downhole temperatures to stabilize / inflating packer. RUNPRD Circulate, test for overpulls, 0.5 in/.5 out, no overpulls/ must be released from IBP RUNPRD POOH 35 fpm, 1.45 in/1.3 out, PVT = 215, IA=56 psi, OA=10 psi RUNPRD POOH with IBP setting assy. 1915 psi, 1.46in/1.Oout, IA=60, OA=17, 120 fpm, PVT at 6815 MD = 194 bbl RUNPRD LD IBP running BHA RUNPRD PU Shoe Track, PJSM for tripping stands RUNPRD RIH picking up stands of 2-3/8" 4.7# L-80 STL liner with cemtralizers, ***drifting all stands*** PVT=169, IA=57,OA=20, -3.0 min/std RUNPRD RIH picking up stands, ran 112 jts total of 2-3/8" 4.7# L-80 STL liner with cemtralizers, RUNPRD MU CTLRT tools, space out subs, CTC, Stab Injector, OAL 3716.44 RUNPRD RIH with Liner Assy #14 to 9800', Up wt 29.2k, Dn wt 16.2k, .22/.51 bpm, 465psi, PVT 180 -208bb1s RUNPRD RIH with Liner Assv #14. taoaed IBP at 12765'. corrected to 12756', tagged several times, Dn wt 16.4k - 9k, Up wt 46k, .22/.39bpm, 1160 - 1400psi, PVT 208 - 221 bbls, several bobbles of 3-5k at 11265, 11318, 11510, 11830, Dn drag of 15k at 12215, 12227, 12318 RUNPRD Stack 10K on liner, Launch ball 5/8 steel with 900psi, Circulate at 1.17/1.35bpm, 2400psi, slowed rate to .35/.49bpm, 1400psi at 30 bbls pumped, ball on seat with 35.4bb1, seat sheared with 4000psi, Release from liner, PU Wt 25k, Confirm release Suck down pits in preparation to swapping well to 2% KCL double slick 09:50 - 13:15 3.42 CASE P RUNPRD Swap well to 2% KCL double slick, 1.4/1.Obpm 3050psi, slowed rate to 1.01/1.05bpm, 2050psi, after pumping 60bbls of KCL water at 1.01/.75bpm, 1800psi, loss rate at 25percent, KCL returns to surface after pumping 130bb1s, 1.01/.88bpm, 1655psi, loss rate decreased to 12percent, increased rate to 1.52/1.07bpm, 2295psi, 30percent loss rate, total KCL water pumped 250bb1s SAFETY MEETING covering HSE hazards with mitigations and procedure of cement job, SLB cementers set up to pump additional 30 percent excess of cement due to 30 percent loses downhole 13:15 - 13:45 0.50 CEMT P RUNPRD Batch mix 20.5 bbl of 15.8 class "G" with additives Ciculating KCL, in rate 1.53, out rate 1.08, 30% losses 13:45 - 15:30 1.75 CEMT P RUNPRD Pump cement job as followed with SLB, pump 5 bbl fresh water, bypassed micromotion, closed inner reel valve, PT cement lines to 6500psi, ok, line back up thru micromotion PUrr1D 14.5 bbl class G cement with latex additives at 1.5/1.0 Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Operations Summary Report Legal Well Name: 15-04 Page 16 of 26 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/27/2007 13:45 - 15:30 1.75 CEMT P RUNPRD bpm, 3665 psi. (increased cement by 4.5 bbl due to 30% losses while circulating KCL) Purge cement line with Biozan, Install and launch wiper dart with 600 psi, displace with Biozan 5 bbl, 1.0/.82 bpm, 2250 psi 10 bbl, 1.5/.90 bpm, 2600 psi 15 bbl, 1.5/.90 bpm, 1600 psi 20 bbl, 1.5/.90 bpm, 1600 psi 25 bbl, 1.5/.90 bpm, 1700 psi 30 bbl, 1.5/.90 bpm, 1850 psi 35 bbl, 1.5/.90 bpm, 2000 psi 40 bbl, 1.0/.80 bpm, 1600 psi Dart landed on LW P at 41.5 bbl, Sheared at 3700 psi 45 bbl, 1.0/.80 bpm, 2650 psi 48 bbl, 1.0/.80 bpm, 4450 psi Slow rate to .75/0.0 bpm at 4' pressure drop off to 2900psi, micromotion showed 4.5bb1 cement on out rate, estimated top of cement at 11378' 50 bbl displ, 0.75/0.0 bpm, 3200 psi 55 bbl displ, 0.75/0.0 bpm, 3417 psi Bumped plug at 55.5 bbl [55.0 bbl calc] with 4500 psi, pressure bleeding off slowly, released pressure, Bled pressure to 0 psi, check floats, Floats holding CIP at 15:20 am 12/27/07 15:30 - 17:00 I 1.501 CEMT I P 17:00 - 17:30 0.50 ~ CEMT ~ P 17:30 - 17:45 0.25 CEMT P 17:45 - 18:15 0.50 CEMT P 18:15 - 22:45 4.50 CEMT P 22:45 - 23:45 1.00 CEMT P 23:45 - 00:00 0.25 CEMT P 12/28/2007 00:00 - 00:30 0.50 CEMT P 00:30 - 02:20 1.83 CEMT P 02:20 - 03:00 I 0.671 CEMT I P 03:00 - 03:05 0.08 CEMT P 03:05 - 04:30 1.42 CEMT P 04:30 - 05:30 1.00 CEMT P 05:30 - 08:00 I 2.501 CEMT I P 17', index Shoe 12756', IBP 12756', TD 12865' RUNPRD Pressure up to 500 psi, unsting running tool. circ 1 bbl at 0.5 bpm, POOH to 12610'CTD, paint EOP flag at 9000', POH replacing voidage, .60/.18bpm, 315psi, Std back injector RUNPRD POH, LD Baker CTLRT, cleared floor of Baker tools, offload down beaver slide RUNPRD PJSM RU handling tools and PU 1" CS Hydril RUNPRD RU handling tools for 1" CS Hydril RUNPRD RIH with CS Hydrill RUNPRD Wait on cement compressive strength to reach 500 psi, circulate.l bpm, 139 psi, while RIH at 15 fpm, PVT=282, IA=59, OA=18, confirm UCA of 500 psi 9hr:22min from start time RUNPRD RIH, 95 fpm, .11 bpm RUNPRD RIH, 223psi, 0.13in/0.44out, IA=56, OA=16, 97 fpm RUNPRD Run into liner, 3073 psi, .84in/ .96out, 3100 psi, IA=61 psi, OA=18, PVT=291, liner clean ""PBTD = 12,727"""' RUNPRD POOH, 120 fpm, 1802 psi, .7in/.55 out, IA=62, OA=18, PVT=290 RUNPRD Flow test at top of liner .5 in/.5out RUNPRD POOH with coil tubing injector, Dropped ball opened circ sub RUNPRD POOH with CS Hydril stands in derrick, PVT=281, IA=62, OA=26 RUNPRD Cont POOH with CS Hydril stands in derrick, total of 59 stds, Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 17 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase I Description of Operations 12/28/2007 05:30 - 08:00 2.50 CEMT P RUNPRD LD mill and mtr. 08:00 - 09:00 1.00 EVAL P LOWERI PU logging tools to rig floor, PJSM on handling radiation source 09:00 - 11:45 2.75 EVAL P 11:45 - 12:55 1.17 EVAL P 12:55 - 15:00 2.08 EVAL P 15:00 - 16:15 1.25 EVAL P 16:15 - 17:15 1.00 EVAL P 17:15 - 20:15 3.00 EVAL P 20:15 - 21:00 0.75 EVAL P 21:00 - 21:30 0.50 EVAL P 21:30 - 21:45 I 0.251 EVAL I P 21:45 - 23:00 ~ 1.25 ~ EVAL ~ C 23:00 - 00:00 1.00 EVAL C 12/29/2007 00:00 - 00:45 0.75 EVAL C 00:45 - 01:15 0.50 EVAL C 01:15 - 04:00 2.75 EVAL C 04:00 - 06:00 2.00 EVAL C 06:00 - 08:00 2.00 i EVAL ~ C 08:00 - 08:45 0.75 EVAL C 08:45 - 09:40 0.92 EVAL C LOWERI MU Logging BHA #16 with SLB MCNL, 58 stds of 1"CSH, MHA, CTC, stab injector, OAL 3676' LOWERI RIH with MCNL logging BHA #16 to 8950', pvt 275bb1s, .50/.80bpm, 600 psi LOWERI Logged Down from 8950' to 12717', 30fpm, .50/.60bpm, 828psi, paint EOP Flag at 8990' at 12666' CTD LOWERI Logged Up from 12692' - 8950', 60fpm, .50/.34bpm, 1000psi LOWERI POH to BHA #16, LD MHA, Std Bk Injector LOWERI POH with BHA # 16, Std Bk 1" CSH, LD 1 jt of 1" CSH to change connection breaks LOWERi PJSM for Laying down MCNL, lay down MCNL LOWERI PJSM for Pressure Test Liner Lap: Time 0: 3/4 bpm - 2000 psi - 3-4 min bleeding slowly from 1000 psi -not pumping 25 min 750 psi -not pumping 30 min 650 psi -not pumping - Fail LOWERI In'ectivit : s 1 bpm 1700 psi peak stabilized at 1440 psi 1.5 bpm 1700 psi peak stabilized at 1540 psi 2.0 bpm 1720 psi initially then steady climb 1800-1900-2000-2200 at 13 bbl total pumped LOWERi PJSM, Cut 100' of coil, PJSM, Weld on new coil connector -let weld cool LOWERI Pull test coil connector LOWERI Assemble SLB SCMT logging tool on Catwalk, Test on Catwalk LOWERI PJSM for picking up BHA, PU SCMT LOWERi RIH with CS Hydrill, PVT =233, IA=52, OA=O LOWERI RIH with Coil PVT=241, IA=52, OA=O , Cir= 1143 , .57in/.9out, 95 fpm LOW ER1 Log up with SCMT-GR-CCL-Temp from 12692' to 9000' with out pumps, 30fpm LOWERI RIH to PBTD at 12692', EOP flag at 8890' LOWERI Shut in well, bullhead 20 bbls as follows BBLS BPM PSI 5 .50 1655 10 .50 1685 15 .50 1685 21 .50 1600 09:40 - 10:10 0.50 EVAL C 10:10 - 12:30 2.33 EVAL C 12:30 - 13:45 1.25 EVAL C 13:45 - 16:30 2.75 EVAL C 16:30 - 17:00 0.50 EVAL C Bleed off pressure thru choke LOWERI Monitor well for 30 mins before log up with SCMT LOWERI Log up with SCMT-GR-CCL-Temp from 12692' to 9000' with out pumps, 30fpm LOWERi POH to SCMT Log BHA # 17, .66/.27bpm, 1534psi at 101fpm, Brk out and std back injector LOWERI POH, LD MHA, 1 Jt of 1" CSH, Std Bk 60 Stds of 1"CSH, LD SCMT BHA # 17 LOWERI PJSM on servicing rig, Service rig, adjust drawwork Brakes Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 18 of 26 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: 1 ell Name: 1 e: Name: From - To 5-04 5-04 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT Start Rig Rig Phase Spud Date: 3/24/1982 : 12/10/2007 End: 1/4/2008 Release: 1/4/2008 Number: N1 Description of Operations 12/29/2007 17:00 - 21:00 4.00 REMCM C RUNPRD PJSM on handling and RIH with BHA, MU CIBP BHA # 18, RIH w/ 61 stds (122 Jts) of 1 "CSH, PVT = 178, IA=52, OA=O 21:00 - 23:10 2.17 REMCM C RUNPRD RIH with Coil PVT=184, IA=52, OA=O ,Cir= 143 , .2in/.5out, 95 fpm, Tag 12703' add 10', 12713' MD (PBTD) 23:10 - 00:00 0.83 REMCM C RUNPRD Drop 1/2" aluminum ball to release CIBP, 3800psi, .95/.90 out, PVT=240. 12/30/2007 00:00 - 00:30 0.50 REMCM C RUNPRD Circulating ball to seat, reduce rate to .5 bpm at 35 bbls, Cir Pressure = 1150 psi, CIBP released at 40.9 bbl, pressure increased to 2000 psi, .48 in/.52out 00:30 - 01:00 0.50 REMCM C RUNPRD Start pumping pill, begin POOH 4 fpm waiting for the 15 bbls of 12#/bbl Naar viscosified (w/2ppb biozan) pill to exit nozzle 01:00 - 02:30 1.50 REMCM C RUNPRD POOH laying in Naar pill, pill falling, no circulating pressure, .4 in/.2 out, IA=56, OA=O, 50fpm, laying in last bbl of pill just above TOL 02:30 - 03:00 0.50 REMCM C RUNPRD BHA above TOL, shut inner reel valve, shut in choke, perform in'ectivi test: Pumped away 15 bbls total, .5bpm/1300 psi, 1/1690, 1.5/1750, 2.0/1970, 2.5/2400 and climbing, shutdown, bleed pressure 03:00 - 03:40 0.67 REMCM C RUNPRD POOH with Coil, well still taking proper fluids ""no static losses""' 03:40 - 04:00 0.33 REMCM C RUNPRD Stand back injector 04:00 - 07:00 3.00 REMCM C RUNPRD POOH w/ CS Hydril, PVT = 183 w/ 61 stds in hole, IA=56, OA=2 07:00 - 07:30 0.50 BOPSU C RUNPRD PJSM on BOP function test, performed weekly BOP function 07:30 - 08:00 0.50 REMCM C RUNPRD PJSM handling cementing BHA#19, MU cementing nozzle, 5' 1 1/4" CSH pupjt, X-O, Hydraulic Disconnect, SLB Weldon CTC, Stab injector, OAL - 8.9' 08:00 - 09:45 1.75 REMCM C RUNPRD IH with Cementin nozzle ass #19 to 9120', .70/.101 bbls, 344psi, 82fph 09:45 - 10:45 1.00 REMCM X WAIT RUNPRD Circulating at .42/.42bpm, 200psi, increased rate to 1.0/1.Obpm at 600psi ,Waiting on SLB equipment to load out cement liner squeeze job, cement equipment on other jobs, 10:45 - 11:30 0.75 REMCM X WAIT RUNPRD Shut in well, bullhead 20 bbls as follows with pump #2, PVT 210bb1s BBLS BPM PSI 0 - 5 .50 1187 - 1285 5 - 10 1.01 1450 - 1450 10 - 15 1.50 1520 - 1600 15-25 2.01 1600-1912 ISIP 1912 - 1014 Minutes 1 927 2 747 3 619 4 531 5 458 10 250 Bleed off pressure thru choke 11:30 - 14:30 3.00 REMCM X WAIT RUNPRD Circulating at .68/.65bpm, 315psi, Waiting on SLB equipment to load out cement liner squeeze job Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 19 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task ~ Code NPT Phase Description of Operations 12/30/2007 14:30 - 15:30 1.00 REMCM X WAIT RUNPRD Little Red Services arrived on location, PJSM on RU, RU surface line to std pipe manifold 15:30 - 16:30 1.00 REMCM X WAIT RUNPRD PJSM on handling and installing access platform, Installing BOP access platform, Little Red rolling displacement tank, heating diesel to 120 degrees 16:30 - 17:00 0.50 REMCM X WAIT RUNPRD Circulating at .43/..41 bpm, 157psi, Waiting on SLB equipment to load out cement liner squeeze job, continue rolling and heating diesel to 120 degrees 17:00 - 18:00 1.00 REMCM X WAIT RUNPRD PJSM for CT x Tubing annulus. Discussed corrdinated operations between Little Red and Rig, Little Red brk circ, PT to 4000 psi. Shut-in well. Bullhead 45bbls of 120 de ree diesel down CT X tubing annulus, bullhead CT at .35bpm to pervent freezing. u ea iesel as Bbls BPM Bullhead PSI Temp IA OA 0 - 5 1.3 1747 120 57 0 5 - 10 1.3 1835 120 57 0 10 - 15 1.3 1923 120 56 0 15 - 20 1.3 1989 130 57 0 20 - 25 1.3 2062 120 59 2 25 - 30 1.3 2142 120 59 2 30 - 35 1.0 2117 120 60 4 35 - 40 1.0 2175 120 61 5 40 - 44 1.0 2249 120 61 5 Shut Down Little Red, Shut in backside choke, bled down Little Red to zero, Monitor Annulus Pressure while wait on cemeters, pumping at minimum rate down CT at .20bpm, 1033psi Minutes Shut In PSI Minutes Shut In PSI 5 1556 50 1575 10 1556 60 1575 15 1560 60 shut down pumps psi fell to 1165psi on annulus 20 1564 30 1567 40 1567 Move fluid down coil every 15 minutes 18:00 - 21:00 3.00 REMCM X RUNPRD Continue holding pressure on backside. Pump 1 bbl of KCL down coil every 15 minutes w/ well shut in Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 20 of 26 ~ Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT 12/30/2007 18:00 - 21:00 3.00 REMCM X 21:00 - 21:10 I 0.171 REM 21:10 - 23:00 I 1.831 REM Spud Date: 3/24/1982 Start: 12/10/2007 End: 1 /4/2008 Rig Release: 1/4/2008 Rig Number: N1 Phase Description of Operations RUNPRD Time Coil Bullhead PSI 19:15 857 1150 19:25 900 1250 19:35 1000 1534 19:50 612 1240 20:05 800 1011 20:30 850 1220 20:45 900 1300 RUNPRD PJSM for bullheading 1 coil volume through coil of 150 degree diesel. Plan is to initially pump at a rate not to exceed 2000 psi shut in well head pressure until diesel moving down the coil, then to gradually cut back rate to get to close to 1500 psi SIWHP when diesel is leaving nozzle. RUNPRD Pump 43 bbl 150 degree diesel Time Rate Cir SI Press Tot Vol 21:17 .6 1337 0 21:19 .4 1729 .5 21:22 .5 1800 .5 21:21 .5 1882 1.3 21:23 .5 1886 2.2 21:25 .6 1919 4.0 21:27 .6 1923 4.7 21:31 .65 1963 7.5 21:51 .63 1945 16.9 diesel over gooseneck moving into hole Target 1700 psi circulating pressure 1500 psi over + 200 psi losses through coil IA=57, OA=6 Circulate at minimum rate that Hot Oil can keep temperature at 150 F Time Rate Cir Press SI Pressure Tot Vol 22:00 .5 1677 1875 24 22:05 .48 1707 1868 25 22:17 .35 1670 1743 31 22:20 .3 1725 1750 33 22:30 .2 1611 1633 35 22:40 .23 1700 1663 37 22:50 .2 1790 1655 41 23:00 .2 1750 1622 42 Shut down Hot Oil -shut inner reel valve 23:00 - 23:50 0.83 REMCM X RUNPRD Wait on SLB cement, wait for pressures to stabilize. Coil and annulus all 150 degree 6.7#/gal diesel. Pressures stabilize at 180 psi coil/ 77 psi shut-in pressure 23:50 - 00:00 0.17 REMCM C RUNPRD SLB arrives on location, pre-job planning with SLB cementing, Nordic, Little Red and SLB coil. 12/31/2007 00:00 - 00:30 0.50 REMCM C RUNPRD Prejob planning meeting with SLB cementing/Hot Oil 00:30 - 01:30 1.00 REMCM C RUNPRD PJSM 01:30 - 01:40 0.17 REMCM C RUNPRD Continue rigging up SLB cementers 01:40 - 01:50 0.17 REMCM C RUNPRD Pump 5 bbls H2O Printed: 1/14/2008 8:58:28 AM ~ ~ BP EXPLORATION Page 21 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/31/2007 101:40 - 01:50 I 0.171 REM 01:50 - 02:00 I 0.17 02:00 - 02:15 I 0.25 02:15 - 03:00 I 0.75 I R 03:00 - 03:35 I 0.58 RUNPRD Well shut in, driller on manual choke monitoring pressures not to exceed 1700 psi. Time Rate Volume Cir Press SI Pressure 01:26 .75 915 560 01:28 .53 .5 1315 1047 01:33 .22 2.2 1750 1575 Finsih pumping 5 bbls H2O Realize we can't inject fast enough with well shut in so we will take diesel returns to the TT while pumping cement down the coil almost to the nozzle, so we will pump cement at higher rate. RUNPRD Pressure test cement lines, zero MM-in (when cement starts into coil), Pump cement 21 bbls total (17 bbls volume in reel before gooseneck), open choke, take returns to Tiger Tank. 1:1 returns 2 in in/ 1.95 out, Cir Press = 2770 psi, choke wide open, nozzle at 9120' MD. 18 bbls away, cement over goosneck, start to shut in choke to hole in/out rate the same. Zero MM-out when 20-21 bbls of cement away. Cir pressure 2040, shut in pressure 22. RUNPRD Pump 5 bbls H2O, Shut down cement, close choke. Pressure building on WHP stable at 1390 psi. MM-Out total 6.1 (this MM-Out Total number suspect because we had return densities of 4#/gal with very high rates showing). Bring on Little Red 1 bpm. At 42 bbl MM-in will have cement at the nozzle, keep choke at 1250 psi. Cement not running away from us 1.5 in/1.24 out, WHP= 1000 psi, Cir Press 1326 psi. Release cementers RUNPRD At 38 bbls (MM-in)slow Little Red to .5 bpm, adjust choke to maintain 1670 psi max on WHP. Out rate goes to zero. .63 bpm in/0.0 bpm out. 42.8 bbls 2 barrels out of nozzle Shut in pressure holding 1400 psi at fully closed bbls in /out in prs whp 44 1.3/0 400 psi 1344 psi 46 1.3/0 390 psi 1282 psi 5 bbls away 48 1/0 919 psi 1400 psi 50 1/.3 900 psi 1578 psi intermittent returns at 1500 psi 1.6 bbl total 54 .7/0 1400 psi 1633 psi 56 .65/0 1552 psi 1600 psi 58 .63/0 1630 psi 1501 psi 60 .53/0 1860 psi 1509 psi 62 .5/0 1981 psi 1542 psi "'""at 62 bbls all cement out the nozzle""** cir .5 bbl min, POOH 60 fpm, replacing coil voidage Str wt 22571#, Cir pressure 2300 psi,1600 WHP, total out returns, Drop SIWHP 500 psi. RUNPRD PUH to safety 0 in /0 out, Park nozzle at 8200 MD, Open Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 22 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT _;_ _ --- 12/31/2007 03:00 - 03:35 0.58 REMCM C 03:35 - 03:45 I 0.171 REMC 03:45 - 04:15 I 0.501 REMC 04:15 - 11:00 I 6.751 REMC 11:00 - 11:10 I 0.171 REMC Spud Date: 3/24/1982 Start: 12/10/2007 End: 1 /4/2008 Rig Release: 1/4/2008 Rig Number: N1 Phase Description of Operations RUNPRD baker choke on coil, bleed off coil. Close baker choke, build pressure on coil -543 psi, may have cement above. Decide to pull up another 1000' replacing coil voidage .5 bpm/57fpm. Little Red out of diesel but we have an entire coil volume full of diesel (16 bbls before diesel would leave the reel house) so we will displace partial volume of the reel with 2% KCL RUNPRD Park at 7400' MD. Flow check /pressure check well. 0 in/ Oout, 0 WHP, 500 psi Coil Pressure. Still shows that cement may be above us even though we are pulling normal. POOH another 500' replacing coil voidage 57 fpm / .54 bpm. Pressure building both sides, don't want to squeeze away cement but want to replace coil voidage without flowing the well. Open choke to drop WHP 1100 down to 0. RUNPRD Park at 6800' MD, well fully shut in, 0 in/0 out, 300 psi on coil 0 psi, WHP = 0. Decide we probably have dissimilar fluids on backside, not cement. Pressure slowly bleeding down on Coil to 150. Pull coil 10' every 30 minutes. Begin wait for UCA. IA= 59, OA=5 RUNPRD Wait on UCA of 500 psi: 04:25 Coil Pressure = 143 psi, Oin/Gout 06:30 Coil Pressure = 43 psi, Oin/Gout 08:30 Moved Fluid in CT at .2bpm, .5bbls, CT at 197psi, SD pressure dropped to 103psi, CT = 103 psi, WH 11 psi, SI 15psi 10:00 CT = 4 psi, WH 11 psi, SI Opsi 11:00 CT = 4 psi, WH 11 psi, SI Opsi, Compressive Strength at 1000psi RUNPRD Pressure up against cement/liner lap at .46bpm, .4bbls, 500psi, Monitor for 10 minutes, ,bled off pressure, open well, static Minutes Circ Psi Pump Psi SI Psi ISIP 575 513 510 1 570 513 470 2 564 502 458 3 564 504 454 4 560 498 450 10 549 487 439 11:10 - 13:00 I 1.831 REMC 13:00 - 14:15 I 1.251 REMC 14:15 - 14:30 0.25 14:30 - 15:00 0.50 15:00 - 15:45 0.75 15:45 - 16:00 0.25 RUNPRD RIH from 6750 - 8812', Dn wt 8.8k, Up wt 22k, Circ at 2.0/2.3bpm, 3100 psi, displace diesel from well with 25 bbls of Biozan sweep, followed with 2 percent double slick KCL, taking weight at 7570', wash down thru diesel contaminated cement from 7570 to 8812' with do drag of 2 -8k, pumped three 25 bbl Biozan sweep around, stacking wt at 8812', unable to work past, cement contaminated returns strung out over 80bbls weighting from 8.7 to 9.5ppg RUNPRD POH to cementing BHA # 19, 2.71/2.23bpm, 1813psi, 125fpm, washing out nipples and GLM's RUNPRD POH LD Cmtg BHA #19 RUNPRD Blow back CT with air, RU Hydraulic cutter, Cut 100' of 2" CT, RD Hyd cutter RUNPRD Weld-on SLB CTC, pull test to 35k, pressure Tested to 3500psi RUNPRD MU cleanout BHA #20 with 2 1/8" mtr and 2.80" mill, MHA, SLB Weldon CTC, stab Injector Printed: 1/14/2008 8:58:28 AM ' BP EXPLORATION Page 23 of 26 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 12/31 /2007 16:00 - 17:25 17:25 - 18:00 18:00 - 19:25 19:25 - 20:25 20:25 - 23:00 23:00 - 00:00 1 /1 /2008 100:00 - 01:00 01:00 - 02:00 02:00 - 04:00 04:00 - 05:30 05:30 - 08:15 08:15 - 09:15 09:15 - 11:15 11:15 - 13:45 13:45 - 15:10 15:10 - 16:00 16:00 - 17:00 17:00 - 19:00 15-04 15-04 REENTE NORDIC NORDIC Hours ', R+COM CALIST 1 Task - _ PLET A Code _ E NPT Start Rig Rig Phase _ - Spud Date: 3/24/1982 : 12/10/2007 End: 1/4/2008 Release: 1/4/2008 Number: N1 Description of Operations --- 1.42 REMCM C RUNPRD RIH with cleanout BHA #20 to 7500' 0.58 REMCM C RUNPRD RIH washing do with some motor work (100 -300 differential) from 7500' - 8790'MD , Up wt 23.3k, Dn wt 10.8k, 1.59/1.67bpm, 1275psi, WOB 1 - 2k, PVT 242bb1s, steady streams of cmt cuttings crossing shaker, cement in returns at 8.5 - 9.01 ppg 1.42 REMCM C RUNPRD Milling mostly firm cement 8790'MD-8857'MD - 50fph, 1300 free spin, 1650 drilling, IA=70, OA=90 1.00 REMCM C RUNPRD Milling cement from 8857' -8915' MD 70 fph with steady motor motor work (1260-1450 psi), PVT = 251, IA=70, OA=67 2.58 REMCM C RUNPRD Milling cement 8915' MD - 8955' MD - 20 -80 fph, intermittent hard stringers followed by soft drilling. 1300 psi free spin, 1650 psi drilling, 1.4in/1.4out, bit appears to cutting 1.00 REMCM C RUNPRD Milling cement 8955' MD - 8976'MD IA=70, OA= 134, 30-40 fph 1.00 REMCM C RUNPRD Milling cement 8976' - 8988' MD, Very firm cement, Still 300-400 psi motor work, PVT=286, IA=70, OA=133, 1.5 in, 1.4 out, density 8.4 in/9.4 out, keeping 1- 5 bbl hi-vis pill in the hole all the time. Hi-vis sweeps bringing larger chunks of cement to the surface 1.00 REMCM C RUNPRD Milling cement 8988' 9010' MD picking up to 80 fph last 10', PVT=283, IA=70, OA=133, 1.6in/1.55 out 2.00 REMCM C RUNPRD Milling cement 9010'- 9063'MD, ROP=15-80 fph ,PVT=284, IA=68, OA=126, 1.6 in/1.55 out keeping 1- 5 bbl hi-vis pill in the hole all the time. Hi-vis sweeps bringing larger chunks of cement to the surface, charge pump struggles to pump Hi-vis sweeps, sometimes sucking air. 1.50 REMCM C RUNPRD Milling cement 9063'-9075MD ROP=12 ,PVT=275, IA=65, OA= 118, 1.6in/1.5 out, density 8.4/ 9.1, 1650 free spin, 1900 milling. Very slow milling but still getting 200-400 psi motor work. 2.75 REMCM C RUNPRD Milling hard cement 9075' - 9085', ROP 22fph, PVT=275, IA=60, OA= 120, 1.618/1.67 out, density 8.4ppg in/out, 1650 free spin, 2021 psi, 200-400 psi motor work, stacking and stalling periodically. 1.00 REMCM C RUNPRD Milling hard cement 9085' - 9089', ROP 3 - 5fph, PVT=275, IA=60, OA= 120, 1.618/1.67 out, density 8.4ppg in/out, 1650 free spin, 2021 psi, 200-400 psi motor work, stacking and stalling periodically. 2.00 REMCM C RUNPRD Milling hard cement 9089' - 9094', ROP 3-5fph, IA=60, OA= 120, 1.61811.,67 out, density 8.4ppg in/out, 1700 free spin, 2021 psi, 200-400 psi motor work, stacking and stalling periodically, swapped well to new KCL double slick with .6percent safe tube 2.50 REMCM C RUNPRD Milling hard cement 9094' - 9096', ROP 3-5fph, IA= 55psi, OA= 85psi, 1.61/1.53 out, density 8.39ppg in/8.42ppgout, 2100 free spin, 2400psi, 200-400 psi motor work, stalling periodically, swapped well to new KCL double slick with .6percent safe tube 1.42 REMCM C RUNPRD POH to surface. Tag up 175 early. 0.83 REMCM C RUNPRD POP of well check pipe for ovality .025. Stab onto well. Open side door stripper. OK. POH .to surface. 1.00 REMCM C RUNPRD LD BHA and install drip pan. PU BHA new mill and motor 2.00 REMCM C RUNPRD RIH. Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 24 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To ~', Hours Task Code NPT - _-_-_ __ 1/1/2008 17:00 - 19:00 2.00 REMCM C 19:00 - 19:30 0.50 REMCM C 19:30 - 21:30 2.00 REMC 21:30 - 23:00 1.50 REMC 23:00 - 00:00 1.00 REMC 1 /2/2008 100:00 - 01:00 01:00 - 02:45 02:45 - 03:00 03:00 - 03:30 03:30 - 04:30 04:30 - 08:00 08:00 - 09:10 09:10 - 17:30 17:30 - 18:30 18:30 - 20:00 20:00 - 22:00 22:00 - 23:00 23:00 - 23:45 1.00 REMC 1.75 REMC 0.25 REMC 0.50 REMC 1.00 REMC 3.50 REMC 1.17 REMC 8.33 REMC 1.00 REMC 1.50 REMC 2.00 REMC 1.00 REMC Spud Date: 3/24/1982 Start: 12/10/2007 End: 1 /4/2008 Rig Release: 1/4/2008 Rig Number: N1 Phase Description of Operations RUNPRD Saw flag at 8016'. RIH. Stall at 9020'. RUNPRD RIH at 3 fpm reaming milled out cement area. Stalled twice at 9097'. RUNPRD Mill cement inside 3-1/2" tubing. 1.5 bpm, 1800-2400 psi, 13 fph, 0.5-1 K wob. Milled to 9118'. 4 stalls at 9118'. RUNPRD Mill cement inside 3-1/2" tubing. 1.5 bpm, 1800-2400 psi, 10 fph, 0.5-1 K wob. Milled softer cement below 9125', milled at 50 fph to top of 2-3/8" liner tag at 9140'. Pick up and ream down and stalled again at 9140'. RUNPRD Back ream up to 7800'. Ream down to top of 2-3/8" liner. clean hole. Drop 1/2" steel ball and circ 20 bbl very high vis Biozan pill behind ball. Ball on seat at 31 bbl. sheared open circ sub. Circ 2.6 bpm at 3900 psi. RUNPRD Circ 20 bbl very high vis sweep around thru open circ sub. Circ bottoms up at 2.6 bpm, 3900 psi. RUNPRD POH with 2.8" milling BHA. Circ at 2.3 bpm at 2800 psi. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for laying out BHA, press testing liner lap and M/U next BHA. RUNPRD Lay out 2.8" milling BHA. RUNPRD Pressure test liner lao. 2000 osi for 30 min. Good liner lao . Lost 60 psi during first 15 min and another 20 psi during last 15 min. Final press = 1920 psi after 30 min. RUNPRD M/U Cement milling BHA #22 with 1.87" HCC parabolic mill, 1-11/16" motor, circ sub, hyd disc, xo and 59 stds of 1" CSH. Test each connection. Milling BHA OAL = 3,660'. RUNPRD RIH to ~ 9140'. RUNPRD Milll cement. Up Wt 22K Free spin .86 bpm ~ 3150 psi. Mill at 3520 psi 8-10 ft/hr. Milled to 9204'. RUNPRD Wiper trip to 7800'. RIH at 50 fpm to get higher AV RUNPRD Mill cement. .9 bpm, 3300-3900 psi, 12 fph. Easy milling below 9220'. Slide in hole at 4 fpm from 9230-9250'. Wiper trip up to top of liner. 26K up wt. 11 K down wt. RUNPRD Mill cement stringers. 12-50 fph. 0.95 bpm, 3500-3900 psi, 0-2 K WOB. Last cement was seen at 9260'. Cleanout to 9400'. Clean wi er to 9100'. RUNPRD RIH while milling at 0.9 bpm, 3300 psi, to 9600'. Wt check, 26K up wt. RIH at 30 fpm to 10,000'. Pick up clean with 26K. RIH clean to 11,000'. Pick up clean at 26K. 0.75 REMCM C RUNPRD RIH clean to 12,000'. Clean pick up at 28K. RIH to 12650'. Slow pump to 0.3 bpm and lightly tag PBTD at 12 703'. This in uncorrected CTD. Printed: 1/14/2008 8:58:28 AM BP EXPLORATION Page 25 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 Spud Date: 3/24/1982 Event Name: REENTER+COMPLETE Start: 12/10/2007 End: 1/4/2008 Contractor Name: NORDIC CALISTA Rig Release: 1/4/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ~~~ Task Code NPT Phase Description of Operations 1/2/2008 123:45 - 00:00 I 0.25 1/3/2008 00:00 - 02:00 2.00 02:00 - 05:00 3.00 05:00 - 05:15 0.251 REM 05:15 - 09:00 3.751 REM 09:00 - 09:30 0.50 09:30 - 10:40 1.17 10:40 - 12:00 1.33 PERFO P 12:00 - 12:15 0.25 PERFO P 12:15 - 15:00 2.75 PERFO P 15:00 - 17:20 2.33 PERFO P 17:20 - 19:10 1.83 PERFO P 19:10 - 20:10 I 1.001 PERFOBI P RUNPRD Circ well to 2% KCL water with friction reducer. Haul off used Biozan milling fluid. Circ at 0.9 bpm at 3600 psi. 29K up wt. RUNPRD Circ well to 2% KCL water with friction reducer. RUNPRD Circ 15 bbl new high vis FloPro pert pill to bottom at 0.8 bpm, 3750 psi. High circ press due to very long 1" CSH workstring of 3660'. Lay in 15 bbl new FloPro pert pill while POH. Held spill drill while POH. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for standing back 1" CSH. RUNPRD Pump 1/2" AL ball and open circ sub. Lay out 1 jt of CSH to change breaks. Stand back 59 stds of CSH. RUNPRD Cut 102" of CT. RUNPRD Install weld on connector. Pull test.30K Pressure test to 3300 psi. LOWERI Load pipe shed LOWERi PJSM up and handling guns LOWERI PU 64 1.56" 6SPF 1606PJ oerforatina auns. total 860 . ns Gun length 135.8.26'. Intervals to be perforated:' 450 11530-11640 11670-11710 11760-11850 11920-12140 12210-12260 12310-12350 12480-12690, Total perfs = 860'. LOWERi PU 37 stands of 1"CSH. Perf BHA OAL = 3,649.51'. LOWERI RIH with SWS 1.56" perforating BHA. Circ at 0.3 bpm at 330 psi. Tagged PBTD at 12,701', up depth. Corrected up depth to PBTD of 12,704'. SWS GR log had tagged PBTD at 12,705'. Minus 1 ft for CIBP that was set on bottom, so true corrected PBTD = 12,704'. LOWERI Pump 4 bbl FloPro pert pill. Insert 1/2" AL ball and displace with 5 bbl FloPro. Displace with KCL water, Position bottom perforation charge at 12,693' while circ ball to firing head. circ at 1.1 bpm at 4200 psi. Very high circ pressure due to very long 2-3/8" liner fluid friction. Slow pump to 0.5 bpm, 1100 psi, at 28 bbl displacement. Ball on seat at 39.5 bbls. Fire uns on de th on th fe Iv. Firing head sheared at 3400 psi, Bottom shot at 12,690'. Good un firin indication. Up wt = 34K and fell back to 31 K while pulling at 30 fpm. Very little overpull after firing guns, total gun length with blanks was 1358'. 860' of perfs. 20:10 - 22:00 1.83 PERFO P LOWERI POH with fired pert guns. Circ at 0.5 bpm, 900 psi. Flow check at surface. 22:00 - 22:15 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and Printed: 1/14/2008 8:58:28 AM • BP EXPLORATION Page 26 of 26 Operations Summary Report Legal Well Name: 15-04 Common Well Name: 15-04 ~' Event Name: REENTER+COMPLETE 'Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code ~I NPT 1/3/2008 22:00 - 22:15 0.25 PERFO P 22:15 - 00:00 1.75 PERFO P 1/4/2008 00:00 - 00:45 0.75 PERFO P 00:45 - 01:00 I 0.251 PERFOBI P 01:00 - 05:00 I 4.001 PERFOBI P 05:00 - 07:00 2.00 RIGD P 07:00 - 09:00 2.00 WHSUR P 09:00 - 09:10 0.17 WHSUR P 09:10 - 09:30 0.33 WHSUR P 09:30 - 11:00 1.50 WHSUR P 11:00 - 11:20 0.33 WHSUR P 11:20 - 11:30 0.17 WHSUR P 11:30 - 12:30 1.00 WHSUR P 12:30 - 13:40 1.17 WHSUR P 13:40 - 15:00 1.33 WHSUR P 15:00 - 16:30 1.50 WHSUR P 16:30 - 18:00 1.50 WHSUR P 18:00 - 18:15 0.25 WHSUR P 18:15 - 20:00 I 1.751 WHSUR I P 20:00 - 21:30 I 1.501 RIGD I P Spud Date: 3/24/1982 Start: 12/10/2007 End: 1/4/2008 Rig Release: 1/4/2008 Rig Number: N1 Phase I, Description of Operations LOWERI mitigation for laying out 1"CSH. LOWERi Lay out 1"CSH in singles. LOWERI Lay out 1"CSH workstring in singles. Flow check. LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for laying out fired pert guns. LOWERI La out fired erf uns and blanks. All shots fired. Load out fired guns from pipe shed. Well was perforated as per program with 860' total of perfs. POST RIH with extra stds of 1"CSH and lay them out in singles. POST PU nozzle. Jet stack and RIH to 2500'. Freeze protect with MEOH. POH. Monotor well. No Flow. POST PJSM or setting BPV. POST Set BPV with dry rod. POST Prep to Blow down reel with N2. POST RU N2. POST PJSM for the N2 blowdown. POST Blow down reel with N2. POST PJSM for pulling back CT. POST Pop off well.Cut off CTC. Install grapple. Pull CT back to reel. Clean pits. POST Change stripper packoff. Stand back injector. POST Prep to swap reels with bridge crane. POST SAFETY MEETING. Review procedure, hazards and mitigation for swapping reels with bridge crane. POST Lower 2" E-Free coil to Veco trailer. Prep reel stand. Pick up 2-3/8" E-coil reel with Bridge crane and set in reel stand. POST N/D BOPE. N/U tree cap and press test. RELEASED RIG AT 21:30 HRS, 01/04/2008. TOTAL TIME FROM RIG ACCEPT TO RELEASE WAS 25 DAYS, 8.5 HRS. Prep to move rig to A-12A. ALL FURTHER INFORMATION WILL BE IN DIMS UNDER WELL A-12A. Printed: 1/14/2008 8:58:28 AM r ~ • bP BP Alaska ~R Baker Hughes INTEQ Survey Report INTEQ e Company: BP Amoco Date: 1!712008 Time: 11:30:27 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Wefl: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24!1982 00:00 63.0 Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi) Wellpath: 15-046 Sarvey Cakulation Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: 15-04 Slot Name: 04 15-04 Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N +E/-W -94.34 ft Easting : 676168.77 ft Longitude: 148 34 23.963 W Position Uncertainty: 0.00 ft Wellpath: 15-046 Drilled From: ' Well Ref. Point 500292072602 Tie-on Depth: 32.00 ft Current Datum: 4:04 3/24/1982 00:00 Height 63.00 ft Above System Datum: Mean Sea Level Magnetic Data: 12/18/2007 Declination: 23.52 deg Field Strength: 57668 uT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (1'VD) +N/-S +E/-W DireMion ft ft ft deg 32.00 0.00 0.00 278.11 Survey Program for Definitive Wellpath Date: 12/28/2007 Validated: Yes Version: 14 Actual From To Survey Tookode Tool Name ft ft 50.00 9800.00 15-04 Boss Gyro (50.00-9800.00 BOSS-GYRO Sperry-Sun BOSS gyro multishot 9806.00 10218.67 15-046PB1 (9806.00.10218.67) MWD MWD -Standard 10240.00 12865.00 MWD (10240.00-12865.00) MWD MWD -Standard Annotation AfD TVD ft ft 10218.67 8842.13 TIP 10240.00 8855.33 KOP 12865.00 8880.84 TD Survey: MWD Start Date: 12/20/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path ~~?-(3~ i • bP BP Alaska $ Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 1/7/2008 Time: 11:30:27 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 63.0 Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi) Wellpath: 15-046 Survey Calculation Method: Minimum Curvature Db: Orade Survey MD ft 1!nd deg Azim deg TVD ft Sys TVD ft N/S ft E/W ft 10218.67 49.92 58.28 8842.13 8779.13 3.32 -3930.09 10240.00 53.57 60.26 8855.33 8792.33 11.87 -3915.69 10270.77 44.07 64.92 8875.57 8812.57 22.58 -3895.20 10300.09 49.04 72.85 8895.75 8832.75 30.18 -3875.36 10330.65 57.39 73.13 8914.03 8851.03 37.33 -3851.97 10360.46 65.54 70.43 8928.26 8865.26 45.53 -3827.13 10396.04 77.76 71.50 8939.44 8876.44 56.51 -3795.26 10426.82 91.93 73.43 8942.20 8879.20 65.72 -3766.11 10455.54 96.80 69.22 8940.01 8877.01 74.88 -3738.99 10486.58 96.03 65.13 8936.54 8873.54 86.84 -3710.57 10516.24 95.82 60.81 8933.48 8870.48 100.25 -3684.29 10546.06 95.94 56.62 8930.43 8867.43 115.65 -3658.95 10576.40 95.44 52.00 8927.42 8864.42 133.26 -3634.44 10606.40 92.43 48.08 8925.36 8862.36 152.47 -3611.50 10637.28 92.83 43.65 8923.94 8860.94 173.95 -3589.37 10666.34 92.89 39.07 8922.49 8859.49 195.73 -3570.20 10696.86 91.35 35.85 8921.36 8858.36 219.93 -3551.65 10727.22 93.35 36.68 8920.11 8857.11 244.39 -3533.71 10761.06 94.55 38.65 8917.78 8854.78 271.11 -3513.08 10791.00 93.32 43.75 8915.73 8852.73 293.58 -3493.41 10823.62 92.49 51.74 8914.07 8851.07 315.47 -3469.32 10854.70 95.81 55.51 8911.82 8848.82 333.85 -3444.37 10886.00 94.09 60.18 8909.12 8846.12 350.44 -3417.98 10916.58 96.06 63.73 8906.41 8843.41 364.76 -3391.10 10946.66 97.66 68.19 8902.82 8839.82 376.92 -3363.83 10978.52 96.18 72.76 8898.98 8835.98 387.49 -3334.03 11008.46 94.52 77.19 8896.19 8833.19 395.21 -3305.25 11039.50 93.29 81.96 8894.07 8831.07 400.81 -3274.80 11069.72 88.50 86.42 8893.60 8830.60 403.87 -3244.76 11100.34 88.99 91.66 8894.27 8831.27 404.38 -3214.16 11130.96 87.33 95.00 8895.25 8832.25 402.60 -3183.61 11160.80 85.33 91.08 8897.16 8834.16 401.02 -3153.88 11190.40 86.47 88.60 8899.28 8836.28 401.10 -3124.36 11220.12 90.40 92.25 8900.09 8837.09 400.88 -3094.67 11249.94 89.33 96.14 8900.16 8837.16 398.70 -3064.93 11280.02 85.82 99.91 8901.43 8838.43 394.51 -3035.18 11310.44 89.94 104.99 8902.56 8839.56 387.96 -3005.52 11339.76 86.09 107.79 8903.58 8840.58 379.69 -2977.41 11372.26 85.70 113.92 8905.90 8842.90 368.16 -2947.13 11398.12 88.90 117.29 8907.12 8844.12 357.00 -2923.85 11429.32 91.23 120.90 8907.09 8844.09 341.83 -2896.59 11461.44 91.07 115.93 8906.44 8843.44 326.55 -2868.35 11491.64 88.40 110.59 8906.58 8843.58 314.63 -2840.62 11521.82 91.57 108.77 8906.59 8843.59 304.47 -2812.21 11552.26 91.78 105.49 8905.70 8842.70 295.51 -2783.14 11585.64 90.06 103.47 8905.16 8842.16 287.17 -2750.82 11615.94 89.48 101.60 8905.29 8842.29 280.59 -2721.25 11645.66 88.06 102.04 8905.92 8842.92 274.50 -2692.16 11675.79 87.45 98.72 8907.10 8844.10 269.08 -2662.55 11705.71 87.51 95.83 8908.42 8845.42 265.29 -2632.91 11732.55 89.08 91.55 8909.22 8846.22 263.57 -2606.14 11762.75 92.16 87.64 8908.89 8845.89 263.78 -2575.95 11795.69 95.20 84.65 8906.78 8843.78 265.99 -2543.16 11fapN MapE ft ft 5960191.37 672239.93 5960200.26 672254.13 5960211.44 672274.36 5960219.50 672294.02 5960227.19 672317.23 5960235.98 672341.87 5960247.70 672373.47 5960257.59 672402.40 5960267.38 672429.29 5960280.01 672457.43 5960294.02 672483.38 5960310.01 672508,35 5960328.19 672532,44 5960347.94 672554.92 5960369.93 672576.54 5960392.15 672595.20 5960416.78 672613.17 5960441.65 672630.53 5960468.85 672650.53 5960491.76 672669.66 5960514.21 672693.23 5960533.17 672717.74 5960550.37 672743.74 5960565.31 672770.27 5960578.11 672797.24 5960589.37 672826.79 5960597.77 672855.38 5960604.08 672885.68 5960607.84 672915.65 5960609.07 672946.22 5960608.01 672976.80 5960607.13 673006.56 5960607.90 673036.07 5960608.38 673065.76 5960606.90 673095.53 5960603.40 673125.37 5960597.55 673155.18 5960589.94 673183.47 5960579.12 673214.01 5960568.51 673237.55 5960553.99 673265.15 5960539.38 673293.74 5960528.11 673321.74 5960518.62 673350.38 5960510.34 673379.65 5960502.76 673412.15 5960496.88 673441.87 5960491.48 673471.09 5960486.75 673500.81 5960483.66 673530.54 5960482.56 673557.33 5960483.48 673587.51 5960486.46 673620.24 ~'S DL.S Tool ft deg/100ft 3891.29 0.00 MWD 3878.24 18.60 MWD 3859.46 32.90 MWD 3840.89 25.92 MWD 3818.75 27.33 MWD 3795.31 28.47 MWD 3765.31 34.46 MWD 3737.74 46.46 MWD 3712.19 22.38 MWD 3685.74 13.33 MWD 3661.62 14.50 MWD 3638.70 13.98 MWD 3616.91 15.24 MWD 3596.92 16.45 MWD 3578.03 14.39 MWD 3562.12 15.74 MWD 3547.18 11.69 MWD 3532.86 7.13 MWD 3516.21 6.80 MWD 3499.90 17.48 MWD 3479.14 24.59 MWD 3457.03 16.14 MWD 3433.24 15.85 MWD 3408.65 13.24 MWD 3383.37 15.65 MWD 3355.36 14.98 MWD 3327.95 15.74 MWD 3298.60 15.84 MWD 3269.29 21.65 MWD 3239.07 17.18 MWD 3208.57 12.18 MWD 3178.92 14.72 MWD 3149.70 9.20 MWD 3120.27 18.04 MWD 3090.53 13.53 MWD 3060.49 17.11 MWD 3030.19 21.49 MWD 3001.20 16.23 MWD 2969.60 18.85 MWD 2944.97 17.96 MWD 2915.85 13.77 MWD 2885.74 15.48 MWD 2856.60 19.77 MWD 2827.04 12.11 MWD 2797.00 10.79 MWD 2763.83 7.95 MWD 2733.62 6.46 MWD 2703.97 5.00 MWD 2673.89 11.19 MWD 2644.01 9.65 MWD 2617.27 16.98 MWD 2587.41 16.48 MWD 2555.26 12.93 MWD by BP Alaska Baker Hughes INTEQ Survey Report 1NTEQ Company: BP Amoco Date: 1/7/2008 Time: 11:30:27 Page: 3 Field: Prudhoe Bay Co-0rdinate(NE) Reference: Well: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 63.0 Well: 15-04 Section (VS) Reference: Well (O.OON,O.OOE,278.11Azi) Wellpath: 15-046 Survey Calculation Method: Minimum Curvature Db: Orade Survey MD ft Incl deg Azim deg TVD ft Svs TVD ft N/S ft EIW ft 11827.47 95.89 80.99 8903.71 8840.71 269.94 -2511.79 11856.83 94.15 78.78 8901.14 8838.14 275.08 -2483.00 11889.27 91.59 77.79 8899.51 8836.51 281.66 -2451.27 11921.85 89.23 84.07 8899.28 8836.28 286.79 -2419.12 11951.35 87.30 86.98 8900.17 8837.17 289.09 -2389.73 11982.97 86.04 91.36 8902.01 8839.01 289.55 -2358.17 12013.67 86.59 95.85 8903.98 8840.98 287.62 -2327.61 12044.17 90.98 100.68 8904.63 8841.63 283.24 -2297.45 12074.11 92.36 105.26 8903.76 8840.76 276.53 -2268.29 12106.51 89.39 110.20 8903.26 8840.26 266.66 -2237.45 12134.47 87.85 114.55 8903.94 8840.94 256.03 -2211.61 12166.81 87.94 120.96 8905.13 8842.13 240.98 -2183.02 12198.25 91.01 121.55 8905.41 8842.41 224.67 -2156.15 12233.59 92.70 123.43 8904.27 8841.27 205.70 -2126.36 12271.45 93.88 117.19 8902.10 8839.10 186.64 -2093.74 12304.95 85.94 113.59 8902.15 8839.15 172.29 -2063.51 12334.21 85.60 110.78 8904.31 8841.31 161.27 -2036.49 12363.61 87.37 107.08 8906.11 8843.11 151.75 -2008.74 12393.17 90.28 105.46 8906.72 8843.72 143.47 -1980.37 12424.13 93.74 102.64 8905.63 8842.63 135.96 -1950.37 12454.65 94.58 99.37 8903.42 8840.42 130.15 -1920.49 12485.65 94.86 96.95 8900.86 8837.86 125.77 -1889.91 12518.43 94.25 93.20 8898.26 8835.26 122.88 -1857.37 12547.13 92.89 91.44 8896.47 8833.47 121.72 -1828.75 12577.73 93.43 86.82 8894.78 8831.78 122.18 -1798.21 12610.65 92.40 83.07 8893.11 8830.11 125.08 -1765.46 12657.83 91.69 76.72 8891.42 8828.42 133.35 -1719.07 12681.87 91.96 73.11 8890.66 8827.66 139.60 -1695.87 12707.29 91.93 70.62 8889.80 8826.80 147.51 -1671.73 12737.48 91.94 67.82 8888.78 8825.78 158.21 -1643.53 12768.04 93.41 65.01 8887.35 8824.35 170.42 -1615.55 12805.23 94.36 61.11 8884.83 8821.83 187.23 -1582.48 12820.92 93.75 58.43 8883.72 8820.72 195.11 -1568.96 12865.00 93.75 58.43 8880.84 8817.84 218.14 -1531.48 MapN MapE ft ft 5960491.14 673651.51 5960496.95 673680.17 5960504.27 673711.73 5960510.16 673743.75 5960513.15 673773.08 5960514.34 673804.61 5960513.14 673835.21 5960509.46 673865.46 5960503.43 673894.77 5960494.30 673925.83 5960484.27 673951.91 5960469.90 673980.84 5960454.23 674008.09 5960435.96 674038.31 5960417.67 674071.36 5960404.03 674101.92 5960393.65 674129.19 5960384.79 674157.15 5960377.17 674185.71 5960370.37 674215.88 5960365.26 674245.88 5960361.60 674276.55 5960359.47 674309.15 5960358.98 674337.79 5960360.16 674368.31 5960363.82 674400.97 5960373.18 674447.16 5960379.97 674470.20 5960388.44 674494.15 5960399.80 674522.09 5960412.67 674549.77 5960430.24 674582.44 5960438.44 674595.77 5960462.33 674632.69 VS DLS Tool ft deg/100ft 2524.75 11.67 MWD 2496.97 9.56 MWD 2466.50 8.46 MWD 2435.39 20.59 MWD 2406.62 11.83 MWD 2375.44 14.39 MWD 2344.91 14.70 MWD 2314.43 21.39 MWD 2284.62 15.97 MWD 2252.69 17.79 MWD 2225.61 16.50 MWD 2195.19 19.81 MWD 2166.29 9.94 MWD 2134.12 7.15 MWD 2099.14 16.75 MWD 2067.18 26.02 MWD 2038.88 9.65 MWD 2010.07 13.93 MWD 1980.82 11.27 MWD 1950.05 14.41 MWD 1919.65 11.03 MWD 1888.76 7.83 MWD 1856.14 11.55 MWD 1827.64 7.74 MWD 1797.47 15.18 MWD 1765.46 11.80 MWD 1720.70 13.53 MWD 1698.61 15.05 MWD 1675.83 9.79 MWD 1649.41 9.27 MWD 1623.44 10.37 MWD 1593.07 10.77 MWD 1580.80 17.48 MWD 1546.94 0.00 MWD ~" ~ • • np BP Alaska Baker Hughes INTEQ Survey Report INTEQ I Comp BynaComp Byna P Amoco Date: 12/26/2007 Time: 12:17:20 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: WeA: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:04 3/24/1982 00:00 6 3.0 WeIL• 15-04 Section (VS) Reference: Well (O.OON,O.OOE,274.8 7Azi) ~'Vellpath: 15-046PB1 Survey Calcula[ion Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 ~ Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: 15-04 Slot Name: 04 15-04 Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N +E/-VV -94.34 ft Easting : 676168.77 ft Longitude: 148 34 23.963 W Position Uncertainty: 0.00 ft Wellpath: 15-046P61 Drilled From: 15-04 500292072670 Tie-on Depth: 9800.00 ft Current Datum: 4:04 3/24/1982 00:00 Height 63.00 ft Above System Datum: Mean Sea Level Magnetic Data: 12/18/2007 Declination: 23.52 deg Field Strength: 57668 nT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 32.00 0.00 0.00 274.87 Survey Program for Definitive Wellpath Date: 12/18/2007 Validated: Yes Version: 1 Actual From To Survey Toolcode Tool Name ft ft 50.00 10314.50 Gyro (50.00-10314.50) (0) BOSS-GYRO Sperry-Sun BOSS gyro multishot 10315.10 12141.00 MWD (9806.00-12141.00) MWD MWD -Standard Annotation NID TVD ~ ft ft 9800.00 8476.66 TIP 9806.00 8481.70 KOP 12141.00 8903.73 TD Survey: MWD Start Date: 12/18/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path Survey MD Inct Azim 1'VD Sys TVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 9800.00 32.86 276.10 8476.66 8413.66 -112.82 -3940.51 5960075.03 672232.25 3916.68 0.00 MWD 9806.00 32.83 276.10 8481.70 8418.70 -112.47 -3943.74 5960075.30 672229.00 3919.94 0.56 MWD 9842.47 28.93 281.30 8513.00 8450.00 -109.69 -3962.23 5960077.64 672210.45 3938.60 12.95 MWD 9871.21 25.10 286.55 8538.61 8475.61 -106.59 -3974.90 5960080.44 672197.72 3951.48 15.69 MWD 9913.33 19.10 297.78 8577.63 8514.63 -100.83 -3989.58 5960085.86 672182.91 3966.60 17.36 MWD 9943.03 15.56 313.01 8605.99 8542.99 -95.84 -3996.80 5960090.68 672175.58 3974.21 19.28 MWD 9973.15 14.37 335.50 8635.12 8572.12 -89.68 -4001.31 5960096.73 672170.92 3979.23 19.55 MWD 10001.47 15.65 359.41 8662.50 8599.50 -82.65 -4002.80 5960103.72 672169.26 3981.32 22.16 MWD 10031.41 19.47 16.47 8691.05 8628.05 -73.82 -4001.43 5960112.58 672170.43 3980.70 21.28 MWD 10061.61 23.96 29.84 8719.12 8656.12 -63.66 -3996.95 5960122.84 672174.67 3977.10 22.04 MWD 10092.71 30.55 34.76 8746.76 8683.76 -51.68 -3989.29 5960135.00 672182.05 3970.48 22.38 MWD a~ ~ ~~~~ • bP BP Alaska $ Baker Hughes INTEQ Survey Report irrTE Q Company: BP Amoco Date: 12/26/2007 Time: 12:17:20 Page: 2 Field: Prudhoe Bay Co-ordioate(NE) Reference: Well: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:04 3!2411982 00:00 63.0 Well: 15-04 Section (VS) Reference: Well (O.OON,OAOE,274.87Azi) Wellpath: 15-046P61 Survey Calculation Method: Minimum Curvature Db: Orade Survey iVID ft Inc! deg Azim deg TVD ft Sys TVD ft N/S ft E/W ft 10122.89 35.19 40.34 8772.10 8709.10 -38.74 -3979.28 10155.75 40.55 46.80 8798.04 8735.04 -24.19 -3965.35 10187.89 45.84 51.19 8821.47 8758.47 -9.80 -3948.73 10218.67 49.92 58.28 8842.13 8779.13 3.32 -3930.09 10248.85 55.10 61.03 8860.49 8797.49 15.40 -3909.43 10278.76 58.30 54.09 8876.92 8813.92 28.82 -3888.37 10309.18 61.99 47.18 8892.08 8829.08 45.55 -3868.01 10341.44 67.45 40.48 8905.86 8842.86 66.60 -3847.86 10367.92 69.93 32.87 8915.50 8852.50 86.37 -3833.15 10397.92 73.40 25.57 8924.94 8861.94 111.21 -3819.28 10424.30 77.16 21.27 8931.65 8868.65 134.62 -3809.15 10469.66 87.05 27.08 8937.88 8874.88 175.53 -3790.76 10502.65 92.85 33.12 8937.91 8874.91 204.04 -3774.23 10534.99 86.59 38.80 8938.06 8875.06 230.20 -3755.25 10561.59 90.43 46.30 8938.76 8875.76 249.77 -3737.29 10592.13 90.25 55.00 8938.57 8875.57 269.11 -3713.69 10622.61 87.36 59.15 8939.21 8876.21 285.67 -3688.12 10653.35 86.71 61.88 8940.80 8877.80 300.78 -3661.40 10682.59 89.79 66.83 8941.69 8878.69 313.42 -3635.07 10712.39 89.91 70.26 8941.77 8878.77 324.32 -3607.34 10743.81 90.37 74.31 8941.70 8878.70 333.88 -3577.41 10774.74 91.84 75.73 8941.10 8878.10 341.87 -3547.54 10804.36 92.52 78.09 8939.97 8876.97 348.57 -3518.71 10834.24 90.92 79.29 8939.08 8876.08 354.43 -3489.43 10863.64 91.69 76.13 8938.41 8875.41 360.69 -3460.71 10897.46 93.14 72.36 8936.98 8873.98 369.86 -3428.20 10927.02 93.99 69.20 8935.14 8872.14 379.57 -3400.34 10957.26 93.01 65.49 8933.30 8870.30 391.19 -3372.50 10988.08 91.14 66.90 8932.18 8869.18 403.62 -3344.32 11018.22 91.07 72.74 8931.60 8868.60 414.02 -3316.05 11053.16 91.97 77.15 8930.67 8867.67 423.09 -3282.33 11084.16 93.10 82.02 8929.30 8866.30 428.68 -3251.88 11113.62 92.64 85.09 8927.82 8864.82 431.99 -3222.64 11143.72 91.26 88.06 8926.80 8863.80 433.78 -3192.62 11183.20 88.10 91.34 8927.02 8864.02 433.99 -3153.15 11213.22 90.80 93.64 8927.31 8864.31 432.68 -3123.16 11243.48 94.83 97.25 8925.82 8862.82 429.82 -3093.09 11273.24 93.59 101.60 8923.64 8860.64 424.96 -3063.82 11305.20 92.26 105.19 8922.00 8859.00 417.57 -3032.77 11332.88 88.00 106.73 8921.94 8858.94 409.96 -3006.17 11362.76 88.50 109.17 8922.85 8859.85 400.75 -2977.76 11391.20 91.66 107.70 8922.81 8859.81 391.76 -2950.78 11421.24 89.78 104.09 8922.44 8859.44 383.54 -2921.90 11452.48 87.30 101.30 8923.23 8860.23 376.67 -2891.44 11481.38 89.14 97.01 8924.13 8861.13 372.08 -2862.93 11511.22 90.09 93.82 8924.33 8861.33 369.26 -2833.22 11541.70 88.34 93.15 8924.75 8861.75 367.41 -2802.80 11577.12 89.51 90.10 8925.41 8862.41 366.41 -2767.41 11605.46 91.81 95.96 8925.09 8862.09 364.91 -2739.12 11635.80 91.23 96.97 8924.28 8861.28 361.50 -2708.99 11665.80 90.86 100.61 8923.73 8860.73 356.91 -2679.35 11697.37 91.35 102.89 8923.13 8860.13 350.49 -2648.45 11730.15 92.52 104.96 8922.02 8859.02 342.60 -2616.65 MapN MapE ft ft 5960148.17 672191.75 5960163.04 672205.34 5960177.81 672221.61 5960191.37 672239.93 5960203.93 672260.31 5960217.83 672281.05 5960235.04 672301.01 5960256.55 672320.66 5960276.67 672334.90 5960301.82 672348.18 5960325.46 672357.76 5960366.78 672375.19 5960395.68 672391.04 5960422.27 672409.40- 5960442.25 672426.90 5960462.14 672450.03 5960479.29 672475.20 5960495.02 672501.56 5960508.28 672527.59 5960519.82 672555.06 5960530.08 672584.75 5960538.77 672614.42 5960546.15 672643.08 5960552.69 672672.22 5960559.62 672700.78 5960569.55 672733.06 5960579.91 672760.68 5960592.18 672788.25 5960605.27 672816.13 5960616.32 672844.15 5960626.18 672877.64 5960632.48 672907.95 5960636.47 672937,10 5960638.97 672967.07 5960640.10 673006.52 5960639.50 673036.52 5960637.34 673066.66 5960633.17 673096.03 5960626.51 673127,24 5960619.52 673154.01 5960610.99 673182.63 5960602.63 673209.81 5960595.09 673238.88 5960588.94 673269.49 5960585.02 673298.09 5960582.90 673327.85 5960581.76 673358.31 5960581.59 673393.71 5960580.75 673422.02 5960578.05 673452.23 5960574.16 673481.96 5960568.46 673513.00 5960561.32 673544.97 VS DLS Tool ft degl100ft 3961.61 18.35 MWD 3948.96 20.27 MWD 3933.63 18.92 MWD 3916.17 21.61 MWD 3896.61 18.62 MWD 3876.76 22.14 MWD 3857.90 23.13 MWD 3839.61 25.27 MWD 3826.64 28.36 MWD 3814.92 25.83 MWD 3806.82 21.25 MWD 3791.97 25.22 MWD 3777.92 25.38 MWD 3761.23 26.13 MWD 3745.00 31.66 MWD 3723.13 28.49 MWD 3699.06 16.59 MWD 3673.72 9.12 MWD 3648.55 19.93 MWD 3621.85 11.52 MWD 3592.84 12.97 MWD 3563.76 6.61 MWD 3535.60 8.29 MWD 3506.92 6.69 MWD 3478.84 11.06 MWD 3447.23 11.93 MWD 3420.30 11.05 MWD 3393.54 12.67 MWD 3366.52 7.60 MWD 3339.23 19.37 MWD 3306.40 12.88 MWD 3276.54 16.11 MWD 3247.69 10.52 MWD 3217.92 10.87. MWD 3178.62 11.54 MWD 3148.63 11.81 MWD 3118.42 17.87 MWD 3088.84 15.16 MWD 3057.28 11.96 MWD 3030.12 16.36 MWD 3001.03 8.33 MWD 2973.39 12.25 MWD 2943.91 13.55 MWD 2912.98 11.95 MWD 2884.18 16.14 MWD 2854.35 11.15 MWD 2823.88 6.15 MWD 2788.53 9.22 MWD 2760.22 22.29 MWD 2729.90 3.84 MWD 2699.98 12.19 MWD 2668.65 7.39 MWD 2636.30 7.25 MWD - ~ ~! by BP Alaska ~~ Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 12/26/2007 Time: 12:17:20 Page: 3 Field: Prudhoe Bay Site: PB DS 15 Co-ordinate(NE) Reference: Vertical (TVD) Reference: Well: 15-04, True North 4:04 3/24/1982 00:00 6 3.0 Wetl: 15-04 Section (VS) Reference: Well (O.OON,O .OOE,274.8 7Azi) R'ellpath: 15-046PB1 Survey Calcula tion Method: Minimum Curvature Db: Orade Survey ~IID Ind Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 11760.73 96.06 107.66 8919.73 8856.73 334.04 -2587.39 5960553.45 673574.42 2606.42 14.54 MWD 11789.91 94.46 109.47 8917.06 8854.06 324.79 -2559.85 5960544.85 673602.17 2578.19 8.26 MWD 11820.93 92.21 113.95 8915.25 8852.25 313.34 -2531.09 5960534.07 673631.19 2548.56 16.14 MWD 11849.75 93.88 118.03 8913.72 8850.72 300.73 -2505.23 5960522.08 673657.34 2521.72 15.28 MWD 11885.51 92.39 121.29 8911.76 8848.76 283.06 -2474.20 5960505.14 673688.77 2489.31 10.01 MWD 11922.17 93.75 118.09 8909.80 8846.80 264.93 -2442.41 5960487.76 673720.98 2456.09 9.47 MWD 11949.69 93.44 114.75 8908.07 8845.07 252.72 -2417.81 5960476.13 673745.85 2430.54 12.16 MWD 11979.59 91.94 113.36 8906.67 8843.67 240.54 -2390.54 5960464.60 673773.40 2402.34 6.84 MWD 12010.11 91.20 110.09 8905.83 8842.83 229.25 -2362.21 5960453.97 673801.99 2373.14 10.98 MWD 12040.51 90.98 107.35 8905.25 8842.25 219.50 -2333.42 5960444.90 673831.00 2343.63 9.04 MWD 12070.45 91.41 105.26 8904.63 8841.63 211.09 -2304.69 5960437.17 673859.91 2314.29 7.13 MWD 12100.25 90.55 107.21 8904.12 8841.12 202.76 -2276.09 5960429,51 673888.70 2285.08 7.15 MWD f2141.00 90.55 107.21 8903.73 8840.73 190.71 -2237.16 5960418.37 673927.89 2245.28 0.00 MWD Ti~~ = FMC GEN 2 WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 63' BF. ElEV = KOP = 3039' Max Angle = 98 @ 10947' Datum MD = 10251' Datum TV D = 8800' SS DRLG DRAFT 13-3/8" CSG, 72#, L-80, ID = 12.347" Minimum ID =1.920" @ 9150' 2-3/8" Liner, STL Pin 3-1/2" TBG, 9.2#, 13-CR..0087 bpf, ID = 2.992" I~ 9078' 17" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I-i 9167' 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I 9202' TOP OF 7" LNR 9270' 9-5/8" CSG, 47#, L-80, ID = 8.681" 9588' 3.0" BKR DEPLOY SLV, ID = 2.250" 9820' 3" X 2-3/8" XO, ID = 1.92" 9827' PERFORATION SUMMARY REF LOG: SWS MEMORY CNL/GWCCL OF 12/28/07 ANGLE AT TOP PERF: 86° @ 11,350' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-11/16" 6 11350 - 11450 Open 01/04/08 1-11/16" 6 11530 - 11640 Open 01/04/08 1-11/16" 6 11670 - 11710 Open 01/04/08 1-11/16" 6 11760 - 11850 Open 01/04/08 1-11!16" 6 11920 - 12140 Open 01/04/08 1-11/16" 6 12210 - 12260 Open 01/04/08 1-11/16" 6 12310 - 12350 Open 01/04/08 1-11/16" 6 12480 - 12690 Open 01/04/08 4-1/2" SCAB LNR, 12.6#, L-80, .0152 bpf., ~ = 3.958" 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10438' 10460' 15-04B SAFETY NOTES: 3-112" CHROME TBG. 3-1 /2" HES X NIP, ID = 2.813" 9-5/8" X 7" BKR LNR TOP PKR, ID = ??? GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3354 3342 19 MMG DMY RK 0 07/30/06 3 5556 5217 34 MMG DMY RK 0 07/30/06 2 7286 6612 42 MMG DMY RK 0 01 /30/04 1 8921 7798 42 MMG DMY RK 0 01 /30/04 8980' ~ 3-1/2" HES X NIP, ID = 2.813" 9002' 7 X 3-1/2" PKR S-3 PROD PKR, ID = 3.875 9027' 3-1 /2" HES X NIP, ID = 2.813" 9087' UNIQUE OVERSHOT 9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ID = 4.0" 9115' 3-1/2" BAKER SEAL BORE EXTENSION 9124' 3-1/2" BAKER CONCENTRENIC COUPLING 9125' 3-1/2" BAKER SEAL BORE EXTENSION 9130' 3-1/2" BAKER MILLOUT EXTENSION 9159' 9-5/8" X 4-1/2" BKR HYFLO HNGRw/TIEBACK 9144' Top of 2-3/8" Liner 9144' Top of Cement 9171' 3-112" OTIS XN NIP, ID = 2.75" 9202' 3-1/2" WLEG, ID = 2.992" 9189' ELMD TT LOGGED 12/04/90 2-318" Liner cni'ed and perfed 12865' 9806' I~ BTT Mech Whipstock CIBP 12704' 12064' I~ ~~ LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~ 12098' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/26182 ORIGINAL COMPLETION 12/04190 LAST WORKOVER 01118104 DAV/KA CTD SIDETRACK (15-04A) 01/04/08 NORDICI CTD SIDETRACK (15-046) PRUDHOE BAY UNff WELL: 15-046 PERMff No: 2071380 API No: 50-029-20726-02 SEC 22, T11 N, R14E, 4012.86' FEL 8~ 1330.03' FNL BP Exploration (Alaska) 03/06/08 ~chlaml~erger N0.4621 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite aoo Alaska Oil & Gas Cons Comm Anchorage, AK 6951)3-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Pt.Mac,Milne Pt,Orion,Lisburne UIn11 _Inh 1t Inn Daccrintinn Data BL Colnr CD C-41A 12021141 MEM LDL 02/25/08 1 1 MPS-O1A 11970714 SCMT '~} _ C 02/21/08 1 1 P1-06 11975757 PROD PROFILE ~ 03/02/08 1 1 P1-05 11998992 PROD PROFILE ~ 02/29/08 1 1 Pi-06 11975757 SCMT /Qj '~ ~ 03/02/08 1 1 09-23A 12045070 USIT ~ - G ~ 03/02/08 1 1 L5-34 12057596 PROD PROFILE S ~ 02/28/08 1 1 W-40 11970816 PRODUCTION LOG -j 03/04/08 1 1 15-04B 12005202 MCNL ~d - t G 12/28/07 1 1 C-35B 12021139 MCNL t 01/26/08 1 1 X-20A 11661178 CH EDIT PDC GR (MEM CORRELATION) _I 10/26/07 a'~ 1 L-219 12017479 CH EDIT PDC GR (IBC) - [ /(p 01/02/08 1 PLEASE ACKNOWLEDGE RECEIPT B,Y ~l~.;Nt~IG°`ANq kitlgUHLyINCiiONE DOPY EACH I O: BP Exploration (Alaska) Ina Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ~ ~ t~ i`~ t ~` ~~U~i Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: t3 02/2/0$ ~c~l~b~~ge~ NO. 4599 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Polaris,Lisburne Wnll _Inh $ Inn rlnc ,nf:n.. n~f~ of n..l..- rn W-216 40016312 OH MWD/LWD EDIT - _ ~ 01/07/08 2 1 LGI-04 11970706 RST ~_p q 12/31/07 1 1 W-45 40016146 OH MWD/LWD EDIT '}- ( 12/18/07 2 1 15-046 12005202 CH EDIT PDC GR (SCMT) ~~- ~ 12/28/07 1 C-16B 11209604 MCNL ~Q(o-pS ~ / C 05/19/06 1 1 B-18 11962779 RST '¢ 01/05/08 1 1 -aG e~v~~~~v ~~~.a-vVG f~GV G11' 1 V I JIV1911~IV /'\I~/V RC 1 VRI\II`~V VIYC VVrI C/llin 1 V. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 _. 900 E. Benson Blvd. =~~ Anchorage, Alaska 99508 Date Delivered: r ~: .,; Q ~ ~~fs Alaska Data & Consulting Services 2525 Gambell Street, Suite 4 ~ Anchorage, AK 99503-28 8 ~ ATTN: Beth `n / W Received by: • f Date 02-25-2008 Transmittal Number:92929 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Douglas Dortch at the PDC at 564-4973 elivery Contents CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: ?-09C ~v~'-139 '~~59~/~•- 15-046 ~0~._13~ '~ lS-°!'IG 15-04BPB1 o'~o'f•-130 ~~59~i/'.} 18-13B ~p~- /b ~ "' 169~'b L-219 via 20~-- lK~ '`-59yg ~---~. MPF-19 ~GS¢ ~° o.rg roof oorrec~. ~t2 f}P.= ~#' 15~~ m PN-(9 = aun wok dare i~ You pu~l- lie MPF-19L1 ~~ ~ 1M~l~I-~`~~-I v fCse.KOl q,~p Ple sa a Sign ar~d Ret~rone copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~-[-~ - r-tease ~!^~i~vte - ~~ r, ti~ y ~° ~~ ~~ ?(~1Cl~i Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 Date 02-25-2008 Transmittal Number:92929 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have anv questions, please contact Douglas Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: o2-o9c ~v~- t39 ~-,5 9~i~r 15-04B ~o~_t3~ '~ t6~~ 15-04BPB1o~p~-t3~ ~~59`~'-} 18-13B ~p~- /b ~ "' 169 ~~'~ L-219 U~4 20~-- t~l~ ''-59y°i MPF-19 ~~s¢ fwo o,~e roc} ceorrec'F• ~e AP.T ~ ?a~~ m ~N-(9 = awe ~oI dupe iR you puf 1.L~e MPF-19L1 ~_ f 1M~kl-i9~1 _ v r e5~eu.al q,e-o Please Sign ar~d Ret~-one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ¢ ~ k~: hey F `~ ~ _. i- r ~~al ~~ I~~w~~ l~~ti<~~ l~°~Irtt~sd~~~tat aitt~°ltt~t Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 ~G~r~Nt~e - ~~~ 01 /18/08 r >11~11f~~W~i~~s1" NO. 4560 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Lisburne, Pt. Mac, Orion, Borealis WPII _Inh it 1 nn flncn ..a:.... n..a., o~ n_~_- L-219 11966240 MDT `}- IC 12/22/07 1 L-114A 11970807 LDL = 12/30/07 1 L-116 11962777 LDL ~ "" ~ 12/31/07 1 V-211 12021135 MEM INJECTION PROFILE ~C(,-aa(~ 12129/07 1 V-216 12021136 MEM INJECTION PROFILE U 12/30/07 1 L-219 12017479 ISOLATION SCANNER CBL _ L. 01/02/08 1 P2-16 11975750 INJECTION PROFILE 12/31/07 1 F-32 11970707 LDL ~} - 01/04108 1 15-04B 12005202 MEM CEMENT BOND LOG - 12/28/07 1 G-31A 11962778 SCMT ~ - C 01/01/08 1 S-26 11978425 USIT 12/29/07 1 02-16C 11628793 MCNL ~- ~ 08/28/07 1 1 G-04B 11628765 MCNL - c st 04/06/07 1 1 K-02D 11209613 MCNL Ik , C, 07/21/06 1 1 17-07B 11649940 MCNL - ¢1 ~ 02/17/07 1 1 L2-28 11975742 RST - 12/05/07 1 1 Z-06 11968821 RST ~ - 12/13/07 1 1 ra.caaa~ /al.r\rvVVVLtUbt KtI.tIY I CT JiIaNINl7 AIVU Kt 1 UKNIIV(i UNt: C:UF'Y tAt:H I U: BP Exploration (Alaska) Inc. ~.,; t~n..~ Petrotechnical Data Center LR2-1 ~ "-~ 900 E. Benson Blvd. -~,b~-~ '~ _ ,~~ ~ ~„-'-'" Anchorage, Alaska 99508 n .,i. Date Delivered: aE{~~~~ ~ ;~ ?0~~~ 'cr~`i Alaska Data & Consulting Services 2525 Gambell Street, Suite 00 Anchorage, AK 99503- 83 ATTN: Beth Received by: ~~ rir~ BAKER NUGNES INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Te1907-267-6600 Fax 907-267-6623 To Whom It May Concern: January 18, 2008 Please find enclosed directional survey data for the following wells: 18-13BPB 1 18-13BPB2 18-13BPB3 18-13B K-14A H-24A~Z, 15-04BPB 1 15-04B Enclosed for each well is: tea copies of directional survey reports lea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration(Alaska)Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: F~~ ~ ~~~~ ,State of Alaska AOGCC DATE: 1 ~ J~_ ~,~o~~ Cc: State of Alaska, AOGCC 0 0 ~ d a SARAH PALlN, GOVERNOR 17a~~~r ~t ~~f~ 0~ ,~a`asC~taST 333 W. 7th AVENUE, SUITE 100 C~1sStsli 1ZsA~1`I011T CQ~'IIS'~7'I01s ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-04B BP Exploration Alaska, Inc. Permit No: 207-138 Surface Location: 1206' FNL, 237' FWL, SEC. 22, T11N, R14E, UM Bottomhole Location: 4232' FSL, 1461' FEL, SEC. 21, T11N, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field in (pager). DATED this . day of October, 2007 cc: Department of Fish & Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ~ ~ ~i{~`` ~~ l~ ALAS~IL AND GAS CONSERVATION COMMI~N X ~pr~.~ PERMIT TO DRILL jo~~ ,('`~' 20 AAC 25.005 .~ ~ .` .~_~~~ 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ^ Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 15-046 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12650 TVD 8820ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028306 Pool FWL, SEC. 22, T11 N, R14E, UM 1206 FNL, 237 Top of Productive Horizon: 4002' FEL, SEC. 21, T11N, R14E, UM 1298' FNL 8. Land Use Permit: 13. Approximate Spud Date: November 15, 2007 , Total Depth: 4232' FSL, 1461' FEL, SEC. 21, T11N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 27500' 4b. Location of Well (State Base Plane Coordinates): Surface: x-676169 y-5960280 Zone-ASP4 10. KB Elevation (Height above GL): 63' feet 15. Distance to Nearest Well Within Pool: 224' 16. Deviated Wells: Kickoff Depth: 9800 feet Maximum Hole An le: 92 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2140 Surface: 3020 18; Casin Pr ram: S `cificatio ns To - Settin ' De th -Bo ttom uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.7# L-80 STL 3505' 9145' 7966' 12650' 8820' 92 sx Class'G' 1g; PRESE NT WELL CONDITION S UMMARY (To be completed for'Redrill and Re-entry Operations) Total Depth MD (ft): 12295 Total Depth TVD (ft): 8897 Plugs (measured): None Effective Depth MD (ft): 12064 Effective Depth TVD (ft): 8914 Junk (measured): None .Casing length Size Cement Volume MD TVD Conductor /Structural 110' 20" 400 sx Permafrost II 110' 110' Surface 2649' 13-3/8" 2000 sx Fondu 400 sx PF'C' 2649' 2649' Intermediate Production 9588' 9-5/8" 500 sx Class'G' 9588' 8305' Liner 1190' 7" 350 sx'G' (7" 26# L-80, Liner Tieback 2451' - 9167') 927()' - 10460' 8061' - 8940' Liner Tieback 1279' 4-1/2" Liner Tieback 9159' - 10438' 7677' - 8940' Liner 2278' 2-3/8" 78 sx Class 'G' 9820 - 12098' 8494' - 8912' Perforation Depth MD (ft): 10360' - 12061' Perforation Depth TVD (ft): 8930' - 8914' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name can McLau hlin Title CT Drilling Engineer Prepared By Name/Number: Si nature ,/L. ~ Phone 564-4387 Date +G C~ Sondra Stewman, 564-4750 Commission Use Onl Permit To Drill Number:a~~~3~~ API Number: 50-029-20726-02-00 Permit Approval See cover letter for Date: other re uirements Conditions of Approval: 1 If box is checked, well may not be used to explore for, test, or produce coalbed me~th/ane, gas hydrates, or gas contained shales: U( Samples Req'd: Yes L10 No Mud Log Req'd: ^ Yes L10 No H S Measures: ~J Ye~^ N Directional Survey Req'd: Yes ^ No Other: 3~e51~~~ ~~5~ c.~S 'e~Grr~ /~ ~ D~ APPROVED BY THE COMMISSION Date ~ ~ ,COMMISSIONER Form 10-401 Revised 12/2005 ("1 n ~ ~ I n ~ Submit In Duplicate by To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Sean McLaughlin, CTD Engineer Date: October 4, 2007 Re: Prudhoe Bay 15-04B Permit to Drill Request The sidetrack, 15-04B, is scheduled to be drilled by Nordic 1 around November 15, 2007. The plan calls for a slimhole lateral with a solid liner and 1000 ft of perforations in Zone lA. Pre-Rig Work: The pre CTD work is slated to begin on October 15th, 2007. 1. O Passed MIT-IA, -OA Done 6/7/07 2. S Caliper inspection to 9900' 3. E Set 2-3/8" CIBP at 9850' 4. O PT CIBP to 2000 psi 5. E Set Baker 3-1/2" x 4-1/2" whipstock lowside at 9800'. 3O~ _ -30 6. O PPPOT-IC, -T; LDS 7. O PT MV, SV, WV 8. O Blind and bleed lines, remove well house, level pad Rig Work: 1. MIRU and test BOPE to 250 psi low and 3500 psi high 2. Mi112.74" window at 9,800' and 10' of openhole. Swap the well to Flo-Pro. 3. Drill Build: 3" OH, 900' (20 deg/100 planned) 4. Drill Lateral: 3" OH, 1950' horizontal (10 deg/100 planned) -;~ ~S ~e`~~1 5. Run 2 3/8" solid liner leaving TOL at 9145' 1 Y 6. Pump primary cement fob to TOL, 19 bbl of 15.8 ppg cmt planned 7. Run CO assembly 8. Run MCNL/GR/CCL log 9. Test liner lap to 2000 psi. 10. Perforate, planned 1000ft. 11. Freeze protect well, Set BPV, RDMO Post-Rig Work 1. Pull BPV 2. Install well house. Hook up flow line. Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Casing Program: • 2 3/8", 4.7# , L-80, STL connection Solid liner - 9145' to 12650' MD • A minimum of 19 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9145 ft (TOL). Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 27500' • Distance to nearest well within pool - 224' ft to 15-48 Anticollision Summary • 15-06A - 611' ctr-ctr, Status: Active well; 15-04B will be drilled towards the toe of 15-06A • 15-23A - 644' ctr-ctr, Status: Active well; During the build section 15-04B with be drilled 185' TVD above 15-23A • 15-26B - 524' ctr-ctr, Status: Active well; Near TD 15-04B will be 107' TVD below 15-26B • 15-48 - 224' ctr-ctr, Status: P&A'd • 15-48A - 633' ctr-ctr, Status: P&A'd Logging • MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole GR/CCL/CNL log will be run. Hazards • The maximum recorded H2S level on DS 15 is 40 ppm on 15-20C • Lost circulation risk is low. Reservoir Pressure • Res. press. is estimated to be 3,020 psi at 8,800'ss (6.6 ppg EMW). Maximum surface pressure with gas (0.10 psilft) to surface is 2140 psi. Sean McLaughlin CTD Drilling Engineer 564-4387 CC: Well File Sondra Stewman/Terrie Hubble TREE = FMC GEN 2 WELLHEAD= FMC ACTUATOR = AXELSON KB. ELEV = 63' BF. ELEV = KOP = 3039' Max Angle = 93 @ 11985' Datum MD = 10240' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" Minimum ID =1.920" @ 9827" 3" X 2-3/8" XO 3-1/2" TBG, 9.2#, 73-CR, .0087 bpf, ID = 2.992" ~-~ 9078' 7" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I~ 9167' 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 11 9202, TOP OF 7" LNR 9270' 9-5/8" CSG, 47#, L-80, ID = 8.681" 9588' PERFORATION SUMMARY REF LOG: ANGLEATTOPPERF: 70° @ 10360' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-9/16" 6 10360 - 10380 O 05/30/07 1-11/16" 6 10526 - 10556 O 04/14/07 1-11/16" 6 10648 - 10708 O 04/14/07 1-11/16" 4 10790 - 10810 O 01/15/04 1-11/16" 4 10975 - 10995 O 01/15/04 1-11/16" 4 11030 - 11230 0 01/15/04 1-11/16" 4 11330 - 11520 0 01/15/04 1-11/16" 4 11530 - 11930 O 01/15/04 1-11/16" 4 12010 - 12061 O 01/15/04 ~4-1/2" SCAB LNR, 12.6#, L-80, .0152 bpf., ID = 3.958" ~ 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 15-04A SAFETY NOTES: 3-712" CHROME TBG. 2199' -i 3-1/2" HES X NIP, ~ = 2.813" 2451' 9-5/8" X 7" BKR LNR TOP PKR, ID = ??? GAS LIFE MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3354 3342 19 MMG DMY RK 0 07/30!06 3 5556 5217 34 MMG DMY RK 0 07/30/06 2 7286 6612 42 MMG DMY RK 0 01!30/04 1 8921 7798 42 MMG DMY RK 0 01/30/04 8980' 3-1 /2" HES X NIP, ~ = 2.813" 9002' 7 X 3-1 /2" PKR S-3 PROD PKR, ~ = 3.875 9027' 3-1/2" HES X NIP, ID = 2.813" 9087' UNIQUEOVERSHOT 9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ~ = 4.0" 9115' 3-1/2" BAKER SEAL BORE EXTENSION 9124' 3-1/2" BAKER CONCENTRENIC COUPLING 9125' 3-1/2" BAKER SEAL BOREIXTENSION 9130' 3-1/2" BAKER MILLOUT IXTENSION 91~ 9-5/8" X 4-1/2" BKR HYFLO HNGRwlTIEBACK 9171' ~ 3-1/2" OTIS XN NIP, ID = 2.75" 9202' 3-1/2" WLEG, ID=2.992" 9189' ELMD TT LOGGED 12/04/90 MILLOUT WINDOW 10194' - 10216' 9 820' I-~ 3.0" BKR DEPLOY SLV, ID = 2.250" 9827' 3" X 2-3/8" XO, m = 1.92" 10194' TOP OF WHIPSTOCK (1/2004) 12064' H PBTD LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~-i 12098' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/26/82 ORIGINAL COMPLETION 05/28/07 JAF/TLH CORRECTIONS (SCAB LNRS) 12/04190 LAST WORKOVER 06/01/07 CJA/PAG ADPERFS (05/30/07) 01/18/04 DAV/KA CTD SIDETRACK (15-04A) 01/30/04 DTR/KAK GLV GO 07/30/06 DRF/PAG GLV GO 04/29/07 SGS/TLH PERFS (04/14/07) PRUDHOE BAY UNIT WELL: 15-04A PERMfT No: 82031140 API No: 50-029-20726-01 SEC 22, T11 N, R14E, 4012.86' FEL & 1330.03' FNL BP I]cploratlon (Alaska) TREE = FMC GEN 2 WELLHEAD= FMC ACTUATOR= AXELSON KB. ELEV = 63' BF. ELEV = KOP = 3039' Max Angle = 93 ~ 11985' Datum MD = 10240' Datum TV D = 8800' SS 15 -O 4 ~ SAFETY NOTES: 3-1 /2" CHROME TBG. Proposed CTD Sidetrack 13-3/8" CSG, 72#, L-80, ID = 12.347" 2649' Minimum ID =1.920" @ 9827" 3" X 2-3/8" XO ~ 3-1/2" TBG, 9.2#, 13-CR, .0087 bpf, ID = 2.992" I ~ 7" TIEBACK LNR, 26#, L-80, .0383 bpf, ID = 6.276" I 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" ~ 9202' TOP OF 7" LNR 9270' 9-5/8" CSG, 47#, L-80, ID = 8.681" 9588' 3.0" BKR DEPLOY SLV, ID = 2.250" ~-i 9820' 1 3" X 2-3/8" XO, ID = 1.92" 9827' PERFORATION SINTMRY REF LOG: A NGLE AT TOP P3~F: 70° @ 10360' MLLOUf V~DO/V 10194' - 10216 Note: Refer to Reduction DB for historical data SQE SPF INiB2VAL OATE 1-9/16" 6 10360- 10380 O 05/30/07 1-11116" 6 10526- 10556 O Oata07 1-1v1s° s 10648-1o7os 0 oalao7 1-1v1s" a 10790- 10810 0 ov15/oa 1-11/16" 4 10975- 10995 O 01/15104 1-11/16" 4 11030- 11230 O 01/15/04 1-11/16" 4 11330- 11520 O 01/15/04 1-11/16" 4 11530- 11930 O 01/15/04 1-11/16" 4 12010- 12061 O 01/15/04 4-112" SCAB LNR, 12.6#, L-80, .0152 bpf., ID = 3.958" 10438' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10460' 2199' ~ 3-1/2" HES X NIP, ID= 2.813" 2451 9-5/8" X 7" BKR LNR TOP PKR, ID = ??? GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3354 3342 19 MMG DMY RK 0 07/30/06 3 5556 5217 34 MMG DMY RK 0 07/30/06 2 7286 6612 42 MMG DMY RK 0 01!30/04 1 8921 7798 42 MMG DMY RK 0 01/30/04 8980' - ~ 3-1 /2" HES X NIP, ~ = 2.813" 9002' 7 X 3-1/2" PKR S-3 PROD PKR, ID = 3.875 9027 3-1/2" HES X NIP, ID = 2.813" 9087 UNIQUE OV ERSHOT 9112' 7-1/2" X 3-1/2" BAKER FB-1 PKR, ID = 4.0" 9115' 3-1/2" BAKER SEAL BORE EXTENSION 9124' 3-1/2" BAKER CONCENTRENIC COUPLING 9125' 3-1/2" BAKER SEAL BORE EXTENSION 9130' 3-1/2" BAKER MILLOUT IXTENSION 9159' 9-5/8" X 4-1/2" BKR HYFLO HNGR w /TIEBACK 9145' Top of 2-3/8" Liner 9145' Tch .,~ ~ .,..;_;,t 9171' 3-1 /2" OTIS XN NIP, ID = 2.75" 9202' 3-1/2" WLEG, ID = 2.992" 9189' ELMD TT LOGGED 12/04/90 ~ 2-3/8" cmt'ed and perfect 12650' 9800' I~P,1ech Whipstock 9850' 1~2-3I8" CIBP 12064' I~ PBTD 2-3/8" LNR, 4.6#, L-80, .0036 bpf, ID = 1.920" ~-j 12098' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/26182 ORIGINAL COMPLETION 05/28/07 JAF/TLH CORRECTIONS (SCAB LNRS) 12/04/90 LAST WORKOVER 06/01!07 CJA/PAG ADPERFS (05/30/07) 01118104 DAV/KA CTD SIDETRACK (15-04A) 01/30/04 DTR/KAK GLV GO 07/30/06 DRF/PAG GLV GO 04/29/07 SGS/TLH PERFS (04/14/07) PRUDHOE BAY UNrr WELL: 15-04A PERMfr No: 2031140 API No: 50-029-20726-01 SEC 22, T11 N, R14E, 4012.86' FEL & 1330.03' FNL i BP Exploration (Alaska) by BP Alaska Baker Hughes INTEQ Planning Report ~ilr s~:~ INTEQ Compaaye BP Amoco Date: 10/3/2007 Time: 11:17:30 Page: 1 field: Prudhoe Bay Co-ord®ate(NE) Reference: Wetl: 15-04, True North Site: PB DS 15 Vertical (TVD) Reference: 4:043/24/1982 00:00 63.0 .Well: 15-04. Sectioe (VS)Referencee Well (O.OON,t).OOE,90.OOAzi) Wellpath; Plan 6 15-046 Survey Cakulatioe Method: Minimum Curvature Dh: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5958837. 36 ft Latitude: 70 17 35.236 N From: Map Fasting: 676296.98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft ~ Grid Convergence: 1.34 deg Well: 15-04 Slot Name: 04 15-04 Well Position: +N/-S 1445.51 ft Northing: 5960280.17 ft Latitude: 70 17 49.453 N +E/-W -94.34 ft Fasting : 676168.77 ft Longitude: 148 34 23.963 W Position Uncertainty: 0.00 ft Wellpath: Plan 6, 15-046 Drilled From: 15-04 50-029-20726-02-00 Tie-on Depth: 9800.00 ft Current Datum: 4:04 3/24/1982 00:00 Height 63 .00 ft Above System Datum: Mean Sea Level Magnetic Data: 1/10/2008 Declination: 23.48 deg Field Strength: 57669 nT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 32.00 0.00 0.00 90.00 Plan: Plan #6 Date Composed: 9/25/2007 copy Sean M.'s Plan 6 Version: 9 Principal: Yes Tied-to: From: Definitive Path Targets Map ..Map <-- Latitude --> <- Longitude -> Name Description TVD +N/-S +E/-W Northing.. Eastitig Deg Min Sec Deb Mig Sec Dip. Dir. ft ft ft ft ft 15-046 Fault 1_2 63.00 870.92 -4470.87 5961046.00 671679.00 70 17 58.005 N 148 36 34.299 W -Polygon 1 63.00 870.92 -4470.87 5961046.00 671679.00 70 17 58.005 N 148 36 34.299 W -Polygon 2 63.00 -317.62 -4038.59 5959868.00 672139.00 70 17 46.319 N 148 36 21.679 W 15-046 Potygon 63.00 274.03 -3204.43 5960479.00 672959.00 70 17 52.141 N 148 35 57.372 W -Polygon 1 63.00 274.03 -3204.43 5960479.00 672959.00 70 17 52.141 !N 148 35 57.372 W -Polygon 2 63.00 -55.12 -1581.60 5960188.00 674589.00 70 17 48.909 N 148 35 10.065 W -Poygon 3 63.00 308.28 -1508.06 5960553.00 674654.00 70 17 52.483 N 148 35 7.923 W -Polygon 4 63.00 502.93 -2428.81 5960726.00 673729.00 70 17 54.395 N 148 35 34.765 W -Polygon 5 63.00 740.51 -4113.81 5960924.00 672039.00 70 17 56.725 N 148 36 23.888 W -Potygon 6 63.00 -152.11 -4057.71 5960033.00 672116.00 70 17 47.946 N 148 36 22.239 W 15-04B Fault 2 63.00 685.89 -2808.65 5960900.00 673345.00 70 17 56.194 N 148 35 45.840 W -Polygon 1 63.00 685.89 -2808.65 5960900.00 673345.00 70 17 56.194 N 148 35 45.840 W -Polygon 2 63.00 149.18 -2999.29 5960359.00 673167.00 70 17 50.914 N 148 35 51.391 W 15-046 Fault 3 63.00 817.06 -2472.46 5961039.00 673678.00 70 17 57.485 N 148 35 36.041 W -Polygon 1 63.00 817.06 -2472.46 5961039.00 673678.00 70 17 57.485 N 148 35 36.041 W -Polygon 2 63.00 89.91 -2604.55 5960309.00 673563.00 70 17 50.333 N 148 35 39.884 W 15-046 Fault 1 1 63.00 919.96 -4386.70 5961097.00 671762.00 70 17 58.488 N 148 36 31.846 W -Polygon 1 63.00 919.96 -4386.70 5961097.00 671762.00 70 17 58.488 N 148 36 31.846 W -Polygon 2 63.00 -48.27 -3964.25 5960139.00 672207.00 70 17 48.968 N 148 36 19.516 W 15-046 Fauft 4 63.00 -163.52 -4082.99 5960021.00 672091.00 70 17 47.834 N 148 36 22.975 W -Poygon 1 63.00 -163.52 -4082.99 5960021.00 672091.00 70 17 47.834 N 148 36 22.975 W -Polygon 2 63.00 -260.88 -3813.18 5959930.00 672363.00 70 17 46.878 N 148 36 15.109 W by BP Alaska ~ Baker Hughes INTEQ Planning Report 1NTE Q Company: BP Amoco Date: 10/3/2007 Time: 11:17:30 ,Page: 2 Fietdc Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-04, True-North Site: PB DS 15 Vertical (TVD) Reference: 4 :04 3/24/1982 00:00 83:0 Well: 15-04 Sectioe (VS) Reference. Well (O.OON,O.OOE,90.OOAzi) Welipath: Plan 6, 15-048 SorveyCaknlatioq Method: Minimum Curvature Db: Oracle Targets Map Map ~- Latitude -~ ~. Loe~itnde -> Name Description TVD +N!-S +E/-W Northing Easting Deb Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft 15-046 Fault 6 63.00 -208.68 -3820.96 5959982.00 672354.00 70 17 47.391 N 148 36 15.337 W -Polygon 1 63.00 -208.68 -3820.96 5959982.00 672354.00 70 17 47.391 N 148 36 15.337 W -Polygon 2 63.00 -554.19 -3719.02 5959639.00 672464.00 70 17 43.993 N 148 36 12.361 W 15-046 Fauk 8 63.00 -296.11 -1457.20 5959950.00 674719.00 70 17 46.539 N 148 35 6.438 W -Potygon 1 63.00 -296.11 -1457.20 5959950.00 674719.00 70 17 46.539 N 148 35 6.438 W -Potygon 2 63.00 -824.30 -1115.47 5959430.00 675073.00 70 17 41.345 N 148 34 56.474 W 15-046 Fault 10 63.00 -304.99 -4150.33 5959878.00 672027.00 70 17 46.442 N 148 36 24.936 W -Polygon 1 63.00 -304.99 -4150.33 5959878.00 672027.00 70 17 46.442 N 148 36 24.936 W -Polygon 2 63.00 -739.74 -3698.36 5959454.00 672489.00 70 17 42.169 N 148 36 11.756 W 15-04B Fault 9 63.00 1400.96 -2715.85 5961617.00 673421.00 70 18 3.227 N 148 35 43.142 W -Potygon 1 63.00 1400.96 -2715.85 5961617.00 673421.00 70 18 3.227 N 148 35 43.142 W -Potygon 2 63.00 773.55 -2536.50 5960994.00 673615.00 70 17 57.057 N 148 35 37.907 W 15-046 Fault 7 63.00 -380.11 -2738.61 5959836.00 673440.00 70 17 45.710 N 148 35 43.787 W -Polygon 1 63.00 -380.11 -2738.61 5959836.00 673440.00 70 17 45.710 N 148 35 43.787 W -Polygon 2 63.00 -240.50 -2165.14 5959989.00 674010.00 70 17 47.085 N 148 35 27.073 W 15-04B Fault 5 63.00 535.42 -2235.98 5960763.00 673921.00 70 17 54.716 N 148 35 29.144 W -Polygon 1 63.00 535.42 -2235.98 5960763.00 673921.00 70 17 54.716 N 148 35 29.144 W -Polygon 2 63.00 653.06 -1835.09 5960890.00 674319.00 70 17 55.874 N 148 35 17.459 W 15-046 Target 4 8883.00 159.74 -1700.60 5960400.00 674465.00 70 17 51.022 N 148 35 13.535 W 15-046 Target 3 8913.00 358.27 -2701.29 5960575.00 673460.00 70 17 52.972 N 148 35 42.707 W 15-046 Target 2 8918.00 410.06 -2990.17 5960620.00 673170.00 70 17 53.480 N 148 35 51.128 W 15-046 Target 1 8928.00 230.69 -3659.60 5960425.00 672505.00 70 17 51.713 N 148 36 10.640 W Annotation MD TVD ft ft 9800.00 8476.66 TIP / KOP 9820.00 8493.63 End of 9 Deg/100' DLS 10120.00 8775.60 3 10420.00 8923.89 4 10620.00 8928.13 End of 20 Deg/100' DLS 10800.00 8926.27 6 11360.00 8917.12 7 11590.00 8913.26 8 11940.00 8905.87 9 12350.00 8893.52 10 12650.00 8882.84 TD Plan Section Information Ml) Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg. deg ft ft ft deg/100ft deg/100ft deg/100ft deg 9800.00 32.86 276.10 8476.66 -112.82 -3940.51 0.00 0.00 0.00 0.00 9820.00 31.06 276.10 8493.63 -111.69 -3951.03 9.00 -9.00 0.00 180.00 10120.00 31.98 62.10 8775.60 -61.63 -3958.47 20.00 0.31 48.67 160.00 10420.00 87.23 32.28 8923.89 119.04 -3792.83 20.00 18.42 -9,94 325.00 10620.00 90.44 72.16 8928.13 239.04 -3637.96 20.00 1.61 19.94 86.00 10800.00 90.73 54.16 8926.27 319.96 -3478.01 10.00 0.16 -10,00 271.00 11360.00 90.99 110.17 8917,12 393.29 -2 945.14 10.00 0.05 10,00 89.30 11590.00 90.91 87.17 8913.26 358.86 -2 719.32 10.00 -0.03 -10.00 270.00 11940.00 91.43 122.17 8905.87 271.64 -2 386.04 10.00 0.15 10.00 88.80 12350.00 91.87 81.15 8893.52 190.54 -1 993.21 10.00 0.11 -10.00 271.20 by BP Alaska Baker Hughes INTEQ Planning Report ~il~ s INTEQ Company: BP Amoco Date: 10/3/2007 Time: 11:17:30 Page: 3 Field: Prudhoe Bay Co-ordiuatc(NE) Reference: WeN: 15-04, True North Site: PB DS 15 VerticAl (TVD) Reference: 4:04:3/24/198700:00 63.0 Well: 15-04 Section (VS) Refere®ce: Weq (O.OON,O.OOE,90.OOAzi) VYellpath: Plan 6, 15-04 6 Survey Cakvlatiou Method: Minimum Curvature Db: Orade Plan Section Information MD - Iuel Azon TVD +N/-S +E/-W DLS Band' Tura 'TFO Tarset ft deg deg. ft ft ft deg/100ft deg1100ft deg/100ft deg.. 12650.00 92.12 111.17 8882.84 158.72 -1698.53 10.00 0.08 10.01 89.00 Survey MD Intl Azim SS TVD N/S ENVY MapN MapE DLS VS TFO ' Tool ft deg.. deg. ft ft ft ft ft deg/100ft ft deg 9800.00 32.86 276.10 8413.66 -112.82 -3940.51 5960075.03 672232.25 0.00 -3940.51 0.00 MVVD 9820.00 31.06 276.10 8430.63 -111.69 -3951.03 5960075.90 672221.70 9.00 -3951.03 180.00 MVVD 9900.00 16.85 295.08 8503.65 -104.54 -3982.26 5960082.33 672190.31 20.00 -3982.26 160.00 MVVD 10000.00 12.04 21.58 8601.40 -88.53 -3991.65 5960098.11 672180.55 20.00 -3991.65 142.50 MVVD 10100.00 28.24 59.28 8695.30 -66.52 -3967.22 5960120.68 672204.45 20.00 -3967.22 57.78 MWD 10120.00 31.98 62.10 8712.60 X1.63 -3958.47 5960125.78 672213.09 20.00 -3958.47 21.90 MWD 10200.00 45.91 49.38 8774,77 -32.82 -3917.67 5960155.53 672253.20 20.00 -3917.67 325.00 MWD 10275.00 59.76 42.10 8820.00 8.99 -3875.26 5960198.32 672294.61 20.00 -3875.26 334.98 15-04B 10300.00 64.46 40.16 8831.69 25.63 -3860.74 5960215.30 672308.74 20.00 -3860.74 339.41 MWD 10400.00 83.42 33.50 8859.26 102.31 -3803.65 5960293.29 672364.01 20.00 -3803.65 340.32 MWD 10420.00 87.23 32.28 8860.89 119.04 -3792.83 5960310.27 672374.44 20.00 -3792.83 342.19 MWD 10500.00 88.44 48.24 8863.94 179.85 -3741.33 5960372.26 672424.50 20.00 -3741.33 86.00 MWD 10600.00 90.10 68.18 8865.22 232.25 -3656.77 5960426.63 672507.80 20.00 -3656.77 85.39 MVVD 10620.00 90.44 72.16 8865.13 239.04 -3637.96 5960433.85 672526.45 20.00 -3637.96 85.14 MWD 10700.00 90.58 64.16 8864.41 268.77 -3563.76 5960465.32 672599.92 10.00 -3563.76 271.00 MVVD 10800.00 90.73 54.16 8863.27 319.96 -3478.01 5960518.50 672684.44 10.00 -3478.01 270.93 MWD 10900.00 90.84 64.16 8861.89 371.15 -3392.27 5960571.68 672768.96 10.00 -3392.27 89.30 MWD 11000.00 90.93 74.16 8860.35 406.67 -3298.94 5960609.38 672861.42 10.00 -3298.94 89.44 MWD 11100.00 90.98 84.17 8858.68 425.44 -3200.86 5960630.44 672959.03 10.00 -3200.86 89.59 MWD 11200.00 91.01 94.17 8856.93 426.90 -3101.01 5960634.24 673058.81 10.00 -3101.01 89.76 MVVD 11300.00 91.01 104.17 8855.17 410.99 -3002.43 5960620.64 673157.73 10.00 -3002.43 89.93 MWD 11360.00 90.99 110.17 8854.12 393.29 -2945.14 5960604.29 673215.41 10.00 -2945.14 90.11 MWD 11400.00 90.99 106.17 8853.43 380.82 -2907.14 5960592.72 673253.69 10.00 -2907.14 270.00 MIND 11500.00 90.96 96.17 8851.73 361.48 -2809.18 5960575.68 673352.07 10.00 -2809.18 269.93 MWD 11590.00 90.91 87.17 8850.26 358.86 -2719.32 5960575.17 673441.96 10.00 -2719.32 269.76 MWD 11600.00 90.93 88.17 8850.10 359.27 -2709.33 5960575.81 673451.94 10.00 -2709.33 88.80 MVVD 11700.00 91.12 98.17 8848.30 353.76 -2609.62 5960572.64 673551.74 10.00 -2609.62 88.82 MWD 11800.00 91.28 108.17 8846.20 331.01 -2512.40 5960552.18 673649.47 10.00 -2512.40 89.00 MWD 11900.00 91.40 118.17 8843.86 291.73 -2420.60 5960515.06 673742.15 10.00 -2420.60 89.21 MWD 11940.00 91.43 122.17 8842.87 271.64 -2386.04 5960495.79 673777.17 10.00 -2386.04 89.44 MWD 12000.00 91.55 116.17 8841.30 242.42 -2333.69 5960467.80 673830.19 10.00 -2333.69 271.20 MWD 12100.00 91.71 106.17 8838.45 206.37 -2240.59 5960433.95 673924.10 10.00 -2240.59 271.04 MVVD 12200.00 91.81 96.16 8835.37 187.04 -2142.66 5960416.92 674022.45 10.00 -2142.66 270.76 MWD 12300.00 91.87 86.16 8832.15 185.02 -2042.86 5960417.24 674122.27 10.00 -2042.86 270.45 MWD 12350.00 91.87 81.15 8830.52 190.54 -1993.21 5960423.92 674171.77 10.00 -1993.21 270.13 MWD 12400.00 91.95 86.16 8828.85 196.06 -1943.56 5960430.61 674221.28 10.00 -1943.56 89.00 MVVD 12500.00 92.06 96.16 8825.34 194.04 -1843.76 5960430.93 674321.08 10.00 -1843.76 89.17 MVVD 12600.00 92.12 106.17 8821.68 174.71 -1745.85 5960413.90 674419.42 10.00 -1745.85 89.52 MVVD 12650.00 92.12 111.17 8819.84 158.72 -1698.53 5960399.03 674467.10 10.00 -1698.53 89.88 2 3/8" • by BP Alaska Anticollision Report ~.r s INTEQ Company: BP Amoco Date: 10!312007 Tim e: 11:24::08 Page: I field: Prodhoe Bay Reference Site: PB DS 15 Co-ordmate(NE) Reference: WeN: 15-tk, True-North Reference We1L 15-04 Vertkal (TVD) Reference: 4:04 3/24/198700:00 63.0 Reference Welipathc Plan 6 15-04B' Db: Grade GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There are'~f~aeells in this91dld5pal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 100.00 ft Error Model: ISCWSA Ellipse Depth Range: 9800.00 to 12650.00 ft Scan Method: Trav Cylinder North Maximum Radius: 2500.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 9/25/2007 Validated: No Version: 0 Planned From To Survey Tookode Tool Name ft ft 50.00 9800.00 Gyro (50.00-10314.50) (0) BOSS-GYRO Sperry-Sun BOSS gyro multishot -Used in Preferen 9800.00 12650.00 Planned: Plan #6 V9 MWD MWD -Standard Casing Points MD TVD Diameter Hole Size Name ft ft in in 12650.00 8882.84 2.375 3.000 2 3/8" Summary Offset Wellpath ~ Reference .Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft„ 15-04,PIan 6, 15-048,P 12400.00 12400.00 0.00 662.74 -662.74 FAIL: Major Risk PB DS 15 15-01 15-01 V4 Out of range PB DS 15 15-01 15-01A V2 Out of range PB DS 15 15-01 15-01 B V6 Out of range PB DS 15 15-02 15-02 V2 Out of range PB DS 15 15-02 15-02A V7 10000.00 12390.00 1493.95 636.82 857.12 Pass: Major Risk PB DS 15 15-02 15-02APB1 V6 Out of range PB DS 15 15-02 15-026 V14 10025.00 12600.00 1081.53 535.13 546.39 Pass: Major Risk PB DS 15 15-02 15-026P61 V19 9953.50 11032.50 2246.43 689.48 1556.95 Pass: Major Risk PB DS 15 15-02 15-02BPB2 V22 10018.43 11079.50 2322.92 683.71 1639.21 Pass: Major Risk PB DS 15 15-03 15-03 V1 Out of range PB DS 15 15-04 15-04 V5 9800.00 9800.00 0.00 716.06 -716.06 FAIL: Major Risk PB DS 15 15-04 15-04A V2 9800.00 9800.00 0.00 716.06 -716.06 FAIL: Major Risk PB DS 15 15-05 15-05 V5 11100.00 9800.00 1749.30 1308.25 441.05 Pass: Major Risk PB DS 15 15-05 15-05A V2 11100.00 9800.00 1749.301308.25 441.05 Pass: Major Risk PB DS 15 15-05 15-05AP61 V2 11100.00 9800.00 1749.30 1308.25 441.05 Pass: Major Risk PB DS 15 15-06 15-06 V1 12500.00 9000.00 2241.23 848.66 1392.57 Pass: Major Risk PB DS 15 15-O6A 15-O6A V4 12550.00 11288.00 611.04 895.70 -284.66 FAIL: Major Risk PB DS 15 15-O6AP61 15-O6AP61 V2 12550.00 10660.00 1138.91 895.69 243.23 Pass: Major Risk PB DS 15 15-16 15-16 V5 Out of range PB DS 15 15-16 15-16A V3 Out of range PB DS 15 15-17 15-17 V4 Out of range PB DS 15 15-19 15-19 V2 Out of range PB DS 15 15-19 15-19A V2 Out of range PB DS 15 15-20 15-20A V6 Out of range PB DS 15 15-23 15-23 V1 12300.00 9400.00 1075.15 716.83 358.32 Pass: Major Risk PB DS 15 15-23 15-23A V4 10115.56 11100.00 643.96 670.59 -26.64 FAIL: Major Risk PB DS 15 15-24 15-24 V1 Out of range PB DS 15 15-26 15-26 V1 12524.18 9700.00 524.20 711.45 -187.25 FAIL: Major Risk PB DS 15 15-26 15-26A V3 12524.18 9700.00 524.20 711.34 -187.14 FAIL: Major Risk PB DS 15 15-26 15-26B V5 12524.18 9700.00 524.20 712.13 -187.93 FAIL: Major Risk PB DS 15 15-41 151 V1 Out of range PB DS 15 15-41 15-41A V2 Out of range PB DS 15 15-41 15-41 B V3 Out of range PB DS 15 15-41 15-41 BP61 V1 Out of range PB DS 15 15-41 PlarWt315-41 A VO Plan: Out of range PB DS 15 15-47 15-47 V1 Out of range PB DS 15 15-48 15-48 V1 11053.87 11386.30 224.27 761.15 -536.88 FAIL: Major Risk PB DS 15 15-48 15-48A V2 12300.00 10000.00 632.97 726.09 -93.12 FAIL: Major Risk PB DS 15 15-48 15-486 V4 Out of range are i ~_ .- .- BAG Dowell Blind/Shears TOTs of pipes 2" combi pipe/slips ~ ~ Mud Cross I I Mud Cross le of flow cross of blind/shears 2 3/8" combi pipe/slip TOTs 2" combi pipe/slips Swab Valve Flow Tee Alaska Department of Natural Resources Land Administration System Page 1 of 2 • .~ i ~ . a~r..~~c~~. , ' ,_a r~~ ~~s~~~9.., .~ ~,,,arc~ State Cabins a 4J +~ ~ _ ~~ +~SC ~~~ ~ t.A Men! I Case Abstract I Case Detail I Land Abstract _. bile: ~U1. 2830G '~''' Search for ~~.3~:~as_P[at UpcEates AS of r0~~ i ~?I~o; C'zislomer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON 13L ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 1 2 Case Tyre: ~~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS Filc Locution: DOG DIV OIL AND GAS Case Slutz~s: 35 ISS/APPRV/ACTV/ AUTH Status Dute: 09/l4/1965 Tot«I <~cres: 2560.000 Dale Initiated: 05/28/1965 Office of Primary Responsibility: DOG DEV O IL AND GAS Lass 7runsuction Date: 12/04/2006 Case Subtti=pe: ~~~ NORTH SLOPE Iast Trujrsaction: AA-NRB ASSIGNMENT APP ROVED ~l>(ef•1«'rarr: U 'Totivnship: 011N Runge: 014E Sec°tion: 1~ Section Acres: 640 Se~reh ;arms ~7erldlaJl: ~1 towns/11p: ~~ ~ I ~ RCrnge: 014E .JeC~ilon. 16 Sec'U(~ll . I~J'CS': 640 Illeridian: tl Toit~u~liri~: ti l I N Range: 014E. Section: 21 Section flrr<~,: ti40 ~l-Ieridiat~: U Totia~ir~hr~~ t) I I ~ Range: 014E ,Section: ?2 Se~•tioyt 1V cr~~s: (i40 Legal llescription 0 ~ -?8-196 * ~~ *S-1L1; NOTICE LECr,~ I DESCRIPTIONS * ~` CI-1-1?' I1,V 1-1E t 1I1~,16.21,2? 2(0.00 ti- ~- _1 Last updated on 10/11/2007. http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28306... 10/11 /2007 Alaska Department of Natural Resources Land Administration System Page 2 of 2 Not sure who to contact? Have a question about DNR? Visit the Pudic Zri~c~rr~a~crn tenter. Report technical problems with this page to the V~Jet~~ser. Site optimized for Netscape 7, IE 6 or above. This site also requires that all {~fCIE a must be accepted. State of Aiaska Naturai F2esources LAS Home Copyright Privacy System Sta#us __ http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28306... 10/ 11 /2007 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ ~~S'-O~~ PTD# o~D~f~~ / Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. API No. 50- - - API number are , between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. , assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of welly until after (Company NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 7/13/ZO07 • ^^ , , m o , o ~ o ~ ~ c , , , c 3, ~ E ~' ~' o, ~~ ~ ~ ~ ~ ~ ~~ N ° ~ ° ~ r ~ r , w ~ ~ ~ ¢' C E O ~ o ~ w, , ~ o ~ ~ 4 co N, _ , 4 I N• o' ao, ~ . ~ d ~ N' c, c ~ ; ; ~ ~ ~ g, o , c. ; ~ ~ ' , c. m, q N [0 ~ ~ o o- ~1 ~ Y a o ~ •Q ~ ~, W' d' ~ ~ O L O O Z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N, " ~ ~ N, ~ 3. ~ 7. ~. Q O ~ v O' ~, v '~ U. M 2 m m, o, ~ c ~ o, a ~, ~, ~, N a' ar U C m X I ~ m C7 m, o ~ o, a '6 x o. ~ m m ~ ~: ~ ~ ~ ~ ~ ~ f6. ~ ~ ~ ~ O• O, • O. ~ ~ OI ~~ O, O• m. ¢~ ~ ~ • m, Z 7 N ' ' ' ~ ' 'k d z, r, ~, }, ~ , ~ , ~-, ~-, ~-, }; }; } } z, z; , z z z z z ~ ~-, ~- z, ~ ~ }. } ~- ~- } r z z z, z z ~- / - T , , , , ~ m ~ ~~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ f ~ ~ ~ 1 ~ ~ ~ ~ ~ ~ ~ ; ~ v ~ a ; y c. _ m. m. , - E. a~ I , ~ ~ • ~ ~ .~ a~ ~ O fl- c, t, o. d E ,n ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ o, a ~ ~ ~ ~~ ~~ ~~ ~~ ~ ~~ a~, ~~ ~~ ~~ ~~ x U o ~, ~ ~ 3. ~~ , 3. ~ ~ ~ ~ o, ' ~ N, ti' Q' N rn o ~: t ~ O ~ ~ ~ ~ C, ~ ~ j. O G O, N~ ~ ~ U ~ ~ ~ i Q ~ (O. U, ~ m ~ ~ ~~ f ~ ~ ~ ~ ~ ! ` .~0.. \ Q , ~ O, ~: ~ ~ ~ ~ ~, ' , d O T C~ ~~ -O: O. Q, ' , ~ ~ O~ ty/~ ~ ~ rn ~~ ~ ~ a ~ ~ C. ~ N• O C• N ' ~ ~ .a, ~ ~ N, ( ~ m. N ~ ~ N, ~ ~ 'C, Q~ d ~ ~ 'C~ y ~ O~ p. r ~ -O~ N. ~~ ~ N, ~ O~ ~~ U: ~ ~ `C~ ~ ~~ ~~ ~ ~ ~ ~ ~~ y~ W~ m ~~ d T ~ ~ ~: ~, N. ~, C• O. ~ O~ "mil ~ ~ ~ ~. • ~ , . a , ~ . N N ~ ~ } ~ 3~ +' i 00, ' y N ~ T .O 0' O N; 'O a O ~ N U. N ~ O ,N. ~ N ~ c O. Q ~ • 3~ ~ ~.: a, ~~ ~ N, ¢ V ~ ~ ~ ~ C. ~, j. ~ ~~ . , ~, ~ ~ ~ O' ~ ~ ~, ~: m~ .4 O M' ~~ ~ O• 3: N, N ~ N' [~ Z W _ ~ ~ ~ ~ ._~ ~ -a. ~, o~ ~ c. ~, ~ ~ o Z~ m~ N• ,c~ m v ~ 3, N, ~~ a>, d .~ ~ ~ ~~ C• O~ ~ c. ~~ L m~ ~ m, ~ C, y: ]~ ~ i0~ o. o ~ , ~ ~ ~, 7' ~ ¢' ~ ~ y' N' , N' N aS c ~ `~ O ~ ~ ~, ~, -, "6, C C E ~ . m, N O M' ~ C' c uj H' m C O a2S~ ~~ ~; ~ c C O „L_,~ ~ ~ fl' o N~ O: C C 1 (n Qj ~i' ,~ C U' ~ ¢~ N O ~ U.. .N _' >~ m' ~' N •tn g O, ~ O, •~ C, O ~ O ~ 7 ~ . , ~ O' 'D m ~ ~ C Y ~, COQ ~, , N• m O 01 ~~ m, •~~ m, ¢: • N: ~: N~ T O, Y p~ O, N• C y a' ~ ~ °~ O, ~, d ~, o ~, m T ~ ~, a o, m Y c' m, '~ ~ ~ Z, o' .r ~: ~ 3: m ~ o ~ t ~ ~ 3' ~, a~ ~- 3 0. ~ ¢ ~ ~ m. ' ~, ~ ~: c, ~~ ~, . ~ , d m m, d r~ ~ .c: ~ v m~ m. ~~ a. E. ~ v~ a~, ` m• L~ . ' c ay ~: ' ~-~ , •-~ ~, ~ o o: M. m. ~ °'' o d 3' ' o' ~ ' . o~ >, m' ' m w o o z O a m in, ~ vi v _ ~, 3 , 3, a> ~~ ~_: ..~ v ~' 'v. ~. 3 m ~' o q a~ cr d . 'n 0 3. a~ m o ~ ° a o , c, ~. m m . >, m °~ ~, o v, o a, m ° m~ ~~ °~ o, ~ ° ~ $~ o. Y, a~i~ o o~ y, a~ ~~ ~~ m~ ~~ ~ rn o, f ~~ d y~ ~~ ~~ a ~ , °~ a d m, ~~ Q. Q. ~ d v. m i ~~ n ~~ ~ oi~ u °~ ~~ ~~ ~~ - -° m ~ ~' -d m' ~~ m o~ ~~ ... I • c~ c' a o, °tS ~° Q v, m m. E. ~ o, ~ o, a1 aY ~ 3' d ~' q m i, v m, ti m a ~; ~; •c, o; ~ ~ vi ~ d ca ~o m m' ~ m' o' ~ ay ~ c v. ~~ • °~ ~ ~ 3 2. ~° ~ o ~ N' ~ o' ~ m' o, s ~ -~ m~ ~, a, ~~ .~ a , v. a. a a: ~ v. ~~', ~ v' m, n. m~ n~ a~ n 3, S rn v: ~, ~, ~ ~ 'c y~ ~ m ~ a~~ a~. ~~ >, c. Y, ~ c ~~ ~ ~ o ~ ~ t, m °` °' w ~ m ° v ' m~ ~ ~ ~ >, ~° ar E, _ m, -d o. r. c. c. ~ ~ ' m. ' . ~ _. o' '~ ' o. m. ~ c: a~ c X ~ ~, m m. io m: m. m E m. 3 ~ °~ o ~ m m ° ~ °~ ~ =, aj, ~, v ~ m _ v m ~ co ~ ~ ~ a ~ a>; ~, °' -°: -°' >' m- ~ ~ ~ ; o , a o °' a ~' >' ~~ °~ 3~ m ~~ ~' m' ~' w~ w~ ~ 3' `~ ~ r~ ~ °' ; ~' m' • i ~ _ , ~ ~ c i ~ ~ _ ~ 3 ~ d~, ~ a i o ~ ~ ~ E 1 u Y m ~ ami .c ~' ~' ~' 7, o a a ~' ~' ~ ~ , ~ o o ~ ~, ~ ~, m, ~ ~ ~ ~ O O ~ ' °: a i a` i m; '~: m o ~ ~. v ~ a, ~, ~, S, ~, ~, cn, ~, O, O, a, a, v ~, ¢, n., z v. ~, v, v, v: v, ¢, _ ~, ¢, o' m. m, v, ~: ~'; ~ ~ o, ~ ~, v o w d ..~ O N M 'cY LL) O n W _ O O N M V _ to (O 1~ W O O N M 'V ~ (D I~ W O O ~ _ N - M rl' t0 __ (O 1~ W O) r ~ ~ ~ N N N N N N N N N N M M M M M M M M M M U __ _ _. _-_ ___ ._. ~ C.1 ~ I ~ O C r O N O O w N O w N N U c ~ O Q ~ Q ~ ~ ~~ 01 0 I w i o C • o~ i o N p~ v! O a y ~ ~ ~ ~ ~ F-- N J ~ N ~ ~ N U o ? a s a ¢ ` aW ~ a¢ s w c Well History File APPENDIX • Information of detailed nature that is not particufariy germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify Tending infom~ation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this calegory of information. **** REEL HEADER **** MWD 08/03/18 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/12/25 1718748 O1 3" CTK *** LIS COMMENT RECORD *** Iliiiiiiii iiiiiiii! Remark File Version 1.000 iiiiiiiiii iiiiiiiii Extract File: ldwg.las Version I nformation VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9568.0000: Starting Depth STOP.FT 12865.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 15-04B FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 49.453"N 148 deg 34' 23.963"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 25 Dec 2007 API API NUMBER: 50029207260200 Parameter Information Block #MNEM.UNIT Value Description SECT. 22 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 63 Feet Above Perm. Datum DMF RF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 63 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. ~ ~ ~ ~ ~~_ ~~ C~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (SSTVD) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log) provided by Schlumberger dated 28 Dec 2007. (8) Tied to 15-04 at 9600 feet MD (8414 ft. TVDSS) (9) The sidetrack 15-04B was drilled off a permanent whipstock set at 9806 feet MD (8419 feet TVDSS) through a milled window in 4 1/2 inch and 7 inch liner. Top of window 9808 ft.MD (8420 ft.TVDSS) Bottom of window 9816 ft.MD (8427 ft.TVDSS) (10) Baker Hughes INTEQ runs 3 and 4 were used to drill 15-04B PB1. (11) No footage was drilled on run 5. Decision to sidetrack was made while tripping in the hole. (12) Baker Hughes INTEQ run 6 was utilized to open hole sidetrack at 10240 feet MD (8792 feet TVDSS). (13) The interval from 12835 feet to 12865 feet MD (8820 feet to 8818 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9589.44, 9590.06, ! 0.62207 9599.6, 9599.81, ! 0.207031 9601.05, 9601.67, ! 0.621094 9603.95, 9603.33, ! -0.621094 9605.82, 9604.78, ! -1.03711 9608.1, 9606.86, ! -1.24414 9610.38, 9610.38, ! 0 9618.26, 9618.88, ! 0.62207 9624.06, 9625.51, ! 1.45117 9627.79, 9629.66, ! 1.86523 9640.23, 9641.06, ! 0.829102 9646.03, 9645.62, ! -0.414062 9648.73, 9648.11, ! -0.62207 9650.8, 9650.59, ! -0.208008 9803.43, 9803.22, ! -0.207031 9810.48, 9808.2, ! -2.28027 9811.72, 9811.93, ! 0.207031 9813.17, 9813.38, ! 0.207031 9814.62, 9815.87, ! 1.24316 9818.15, 9817.94, ! -0.207031 9824.16, 9824.16, ! 0 9825.82, 9826.44, ! 0.62207 9830.38, 9830.38, ! 0 9835.56, 9835.35, ! -0.207031 9837.84, 9838.25, ! 0.415039 9840.33, 9841.36, ! 1.03711 9842.61, 9843.44, ! 0.829102 9844.98, 9844.98, ! 0 9846.22, 9847.26, ! 1.03711 9850.99, 9851.82, ! 0.829102 9860.73, 9861.35, ! 0.62207 9863.43, 9863.63, 9865.29, 9865.5, 9866.95, 9868.2, 9874.21, 9874, ! 9877.52, 9876.49, 9878.97, 9878.15, 9881.88, 9881.46, 9883.74, 9883.95, 9889.8, 9889.8, 9892.08, 9893.32, 9895.19, 9896.84, 9897.47, 9898.5, 9903.89, 9902.44, 9905.14, 9905.76, 9907.62, 9907.42, 9909.07, 9909.07, 9910.53, 9910.73, 9914.05, 9914.05, 9916.33, 9916.33, 9918.2, 9918.61, 9920.89, 9920.89, 9924.41, 9924.21, 9925.66, 9926.9, 9926.9, 9928.35, 9930.01, 9930.84, 9933.12, 9933.95, 9938.5, 9937.47, 9939.75, 9939.54, 9940.78, 9941.82, 9943.06, 9943.48, 9944.31, 9945.76, 9950.32, 9949.49, 9960.06, 9961.72, 9970.01, 9968.77, 9979.13, 9979.96, 9990, 9989.17, ! 9993.73, 9992.91, 9997.26, 9997.47, 10002.6, 10002.4, 10003.7, 10004.7, 10008.5, 10008.2, 10010.5, 10010.7, 10017.4, 10017.2, 10019.6, 10019.6, 10022.5, 10024, 10025, 10026.1, 10028.8, 10029.2, 10030.2, 10031, 10032.5, 10033.5, 10036, 10036.2, 10038.3, 10038.3, 10041.8, 10042.7, 10047.7, 10047.7, 10049, 10048.3, 10051.2, 10050.8, 10051.9, 10052.3, 10052.5, 10053.3, 10056, 10056.2, 10058.5, 10059.5, 10060.4, 10061.2, 10062, 10062.2, 10064.1, 10064.1, 10065.1, 10066.4, 10067.6, 10068.2, 10069.1, 10069.9, 10071.6, 10071.1, 10073.2, 10072.8, 0.207031 0.208008 1.24316 -0.207031 -1.03613 -0.829102 -0.414062 0.207031 0 1.24414 1.6582 1.03613 -1.45117 0.62207 -0.207031 0 0.207031 0 0 0.415039 0 -0.207031 1.24414 1.45117 0.829102 0.829102 -1.03613 -0.207031 1.03711 0.415039 1.45117 -0.829102 1.6582 -1.24414 0.829102 -0.829102 -0.829102 0.207031 -0.207031 1.03711 -0.207031 0.207031 -0.207031 0 1.45117 1.03711 0.415039 0.829102 1.03613 0.207031 0 0.829102 0 -0.62207 -0.415039 0.414062 0.829102 0.207031 1.03711 0.829102 0.207031 0 1.24414 0.62207 0.829102 -0.415039 -0.415039 10074.9, 10075.3, ! 0.414062 10077.8, 10078, ! 0.207031 10083.8, 10082.8, ! -1.03711 10089.6, 10088.8, ! -0.829102 10092.5, 10091.5, ! -1.03613 10093.7, 10095.2, ! 1.4502 10104.1, 10103.3, ! -0.829102 10105.8, 10105.8, ! 0 10109.8, 10109.6, ! -0.207031 10116, 10115.2, ! -0.829102 10120.4, 10120.4, ! 0 10121.8, 10121.8, ! 0 10123.9, 10124.3, ! 0.414062 10131.4, 10131.6, ! 0.208008 10155.3, 10155.1, ! -0.207031 10157.2, 10157, ! -0.207031 10159.3, 10159.7, ! 0.414062 10162.4, 10161.1, ! -1.24414 10164, 10165.1, ! 1.03613 10166.5, 10168.2, ! 1.6582 10169.9, 10170.9, ! 1.03711 10174, 10174, ! 0 10177.1, 10176.9, ! -0.207031 10180.6, 10180, ! -0.62207 10183.1, 10183.3, ! 0.208008 10185.8, 10185.8, ! 0 10188.9, 10189.7, ! 0.829102 10192, 10193, ! 1.03613 10195.5, 10194.7, ! -0.829102 10197.6, 10198, ! 0.415039 10200.9, 10201.7, ! 0.829102 10203.2, 10203.4, ! 0.207031 10221.9, 10220.9, ! -1.03711 10224.4, 10224, ! -0.415039 10226.3, 10225.9, ! -0.414062 10235.2, 10233.7, ! -1.45117 10236.6, 10237.1, ! 0.415039 10238.3, 10238.9, ! 0.62207 10239.5, 10240, ! 0.414062 10242.4, 10242.9, ! 0.414062 10244.5, 10244.3, ! -0.207031 10248, 10246.8, ! -1.24414 10250.9, 10249.7, ! -1.24414 10252.6, 10252.6, ! 0 10254, 10254.3, ! 0.207031 10256.3, 10257, ! 0.62207 10258.6, 10259.4, ! 0.829102 10261.9, 10261.1, ! -0.829102 10268.1, 10268.6, ! 0.415039 10271.5, 10271.5, ! 0 10272.9, 10274.4, ! 1.45117 10283.7, 10281.6, ! -2.07227 10284.9, 10283.9, ! -1.03613 10288.2, 10287.6, ! -0.62207 10295.9, 10293.8, ! -2.07324 10297.9, 10296.9, ! -1.03711 10300.2, 10298,6, ! -1.65918 10302.7, 10301.2, ! -1.45117 10304.6, 10303.5, ! -1.03613 10307.1, 10306,4, ! -0.62207 10308.9, 10308,3, ! -0.62207 10310, 10309.3, ! -0.621094 10312.4, 10311.8, ! -0.62207 10315.1, 10314.1, ! -1.03613 10316.6, 10315.8, ! -0.829102 10319.1, 10318, ! -1.03613 10322.6, 10321.1, ! -1.45117 10327.6, 10326.1, 10330.5, 10329.2, 10333.4, 10332.5, 10336.9, 10335, 10339.2, 10337.3, 10342.9, 10341, 10345.4, 10343.3, 10347.7, 10345, 10350, 10347.3, 10350.8, 10348.9, 10353.3, 10351, 10354.5, 10352.6, 10355.8, 10354.3, 10357.4, 10355.1, 10360.1, 10358.5, 10362.8, 10361.1, 10365.9, 10364, 10368.6, 10366.1, 10370.7, 10368, 10373.2, 10370.9, 10375.2, 10373.2, 10377.9, 10375.5, 10379.2, 10377.7, 10384.1, 10382.6, 10387, 10384.7, 10388.5, 10387, 10392, 10390.1, 10394.7, 10393.2, 10396.7, 10395.1, 10400.3, 10400.7, 10405, 10405.2, 10407.9, 10407.1, 10411.9, 10409.6, 10413.3, 10411.5, 10416.6, 10414.8, 10423.9, 10420.2, 10425.4, 10422.9, 10428.7, 10426.4, 10432.4, 10429.5, 10434.5, 10431.8, 10437.4, 10434, 10441.1, 10437, 10442.5, 10439.6, 10447.1, 10444.4, 10450.2, 10447.3, 10453.3, 10451, 10456.2, 10452.7, 10456.9, 10454.2, 10460, 10457.5, 10461.8, 10459.1, 10466, 10462.9, 10469.6, 10465.9, 10472.9, 10470.8, 10478.9, 10477.3, 10483.3, 10481.2, 10495.3, 10489.9, 10498.8, 10494.9, 10501.1, 10497.6, 10506.1, 10501.7, 10508.1, 10504.2, 10513.5, 10507.5, 10515.6, 10511, 10517.3, 10514, 10520.2, 10516, 10523.3, 10519.7, 10526, 10522.4, 10530.1, 10526.6, -1.4502 -1.24414 -0.829102 -1.86523 -1.86523 -1.86523 -2.07227 -2.69434 -2.69434 -1.86523 -2.28027 -1.86523 -1.45117 -2.28027 -1.65918 -1.6582 -1.86523 -2.4873 -2.69434 -2.28027 -2.07227 -2.4873 -1.45117 -1.45117 -2.28027 -1.4502 -1.86523 -1.45117 -1.6582 0.414062 0.207031 -0.829102 -2.28027 -1.86523 -1.86523 -3.73145 -2.48828 -2.28027 -2.90234 -2.69434 -3.31641 -4.14551 -2.90234 -2.69531 -2.90234 -2.28027 -3.52441 -2.69531 -2.48828 -2.69434 -3.11035 -3.73145 -2.07324 -1.6582 -2.07324 -5.38965 -3.93848 -3.52441 -4.35352 -3.93848 -6.01172 -4.56055 -3.31641 -4.14551 -3.52441 -3.52344 -3.52441 10532, 10528.5, 10534.7, 10531.1, 10537.8, 10534, 10540.6, 10537.3, 10541.9, 10539.2, 10546.4, 10542.7, 10550.8, 10547.5, 10555.3, 10552.6, 10557, 10554.9, 10560.5, 10557.6, 10563.4, 10560.5, 10568.2, 10564, 10572.5, 10569.9, 10576.7, 10574.4, 10581.3, 10576.7, 10582.9, 10579.8, 10586.4, 10582.7, 10587.9, 10585.2, 10593.9, 10590, 10597.3, 10594.4, 10600, 10597.1, 10603.7, 10600.6, 10606.4, 10603.1, 10608.2, 10604.1, 10610.3, 10606.4, 10612.8, 10609.5, 10615.9, 10612.8, 10619.2, 10616.5, 10624.4, 10619.6, 10646.2, 10641, 10663, 10659.7, 10667.4, 10664.3, 10687.3, 10685.4, 10692, 10690.8, 10696.9, 10694.8, 10701.7, 10699.2, 10710.6, 10709.1, 10714.1, 10714.4, 10718.9, 10717.8, 10723.6, 10723.2, 10724.9, 10724.5, 10728.6, 10726.1, 10733, 10730.7, 10735.7, 10733.4, 10739, 10736.9, 10743.5, 10742.7, 10750.6, 10747.9, 10756.8, 10753.5, 10762.6, 10757.6, 10764.7, 10760.9, 10776.5, 10772.5, 10778.1, 10775, 10780.4, 10777.9, 10784, 10781.8, 10786.3, 10783.6, 10790.9, 10787.8, 10794.4, 10791.1, 10797.7, 10794.8, 10800.4, 10796.7, 10804.2, 10801.9, 10807.5, 10805, 10810.6, 10807.9, 10812.7, 10811.2, 10814.5, 10813.7, 10818.7, 10816, 10822.9, 10820.2, 10827.6, 10824.7, ! -3.52441 ! -3.52441 ! -3.73145 ! -3.31641 ! -2.69531 ! -3.73145 ! -3.31641 ! -2.69434 ! -2.07324 ! -2.90234 ! -2.90234 ! -4.14551 ! -2.69531 ! -2.28027 ! -4.56055 ! -3.10938 ! -3.73145 ! -2.69531 ! -3.93848 ! -2.90234 ! -2.90137 ! -3.10938 ! -3.31738 ! -4.14551 ! -3.93848 ! -3.31641 ! -3.10938 ! -2.69531 ! -4.76758 ! -5.18164 ! -3.31641 ! -3.10938 ! -1.86621 ! -1.24414 ! -2.07227 ! -2.4873 ! -1.45117 ! 0.207031 ! -1.03613 ! -0.414062 ! -0.415039 ! -2.4873 ! -2.28027 ! -2.28027 ! -2.07227 ! -0.829102 ! -2.69434 ! -3.31641 ! -4.97559 ! -3.73145 ! -3.93848 ! -3.10938 ! -2.4873 ! -2.28027 ! -2.69531 ! -3.10938 ! -3.31641 ! -2.90234 ! -3.73145 ! -2.28027 ! -2.4873 ! -2.69531 ! -1.45117 ! -0.829102 ! -2.69531 ! -2.69434 ! -2.90137 10830.7, 10828, 10835.5, 10834.5, 10838.2, 10837.2, 10843, 10840.7, 10844.2, 10842.5, 10847.7, 10847.7, 10855.4, 10857.3, 10860.8, 10862.3, 10898.2, 10894.7, 10900.5, 10897.6, 10904.3, 10902, 10906.7, 10903.8, 10912.8, 10909.6, 10916.7, 10912.8, 10919.6, 10915.7, 10923.1, 10919, 10924.7, 10921.4, 10927.6, 10924.5, 10930.7, 10926.8, 10932.8, 10929.3, 10934.9, 10931.6, 10939, 10934.3, 10941.9, 10937, 10945.5, 10941.1, 10950.2, 10945.6, 10952.9, 10949.3, 10958.2, 10953.1, 10959.9, 10955.6, 10962.2, 10958.2, 10965.3, 10960.1, 10968, 10961.4, 10970.3, 10965.9, 10973.4, 10968.6, 10976.1, 10971.7, 10978.1, 10974.2, 10981.4, 10975.6, 10984.2, 10977.3, 10986.5, 10980.5, 10992.3, 10986.5, 10994.4, 10990.2, 11004.3, 10997.9, 11007.2, 11001.8, 11009.5, 11005.8, 11017, 11015.3, 11024.8, 11018, 11027.3, 11021.3, 11029.2, 11025.5, 11031.3, 11027.9, 11035.2, 11031.9, 11041.2, 11037.9, 11044.1, 11040, 11047.8, 11043.7, 11049.9, 11045.3, 11051.7, 11047.4, 11053.6, 11050.3, 11055.9, 11053, 11077, 11068.7, 11078.2, 11070.4, 11080.1, 11072, 11082.8, 11074.7, 11089.4, 11088.6, 11099.5, 11099.3, 11116.3, 11112.3, 11120.8, 11116.7, 11124, 11119.4, 11126.4, 11122.5, 11148.5, 11148.7, -2.69434 -1.03711 -1.03613 -2.28027 -1.6582 0 1.86621 1.45117 -3.52344 -2.90234 -2.28027 -2.90137 -3.10938 -3.93848 -3.93848 -4.14648 -3.31738 -3.10938 -3.93848 -3.52344 -3.31641 -4.76758 -4.97461 -4.35352 -4.56055 -3.52344 -5.18262 -4.35254 -3.93848 -5.18164 -6.63379 -4.35352 -4.76758 -4.35352 -3.93848 -5.80469 -6.84082 -6.01172 -5.80371 -4.14551 -6.42578 -5.38965 -3.73145 -1.65918 -6.84082 -6.01172 -3.73145 -3.31641 -3.31641 -3.31641 -4.14551 -4.14551 -4.56055 -4.35352 -3.31641 -2.90234 -8.29199 -7.87793 -8.08496 -8.08496 -0.829102 -0.207031 -3.93848 -4.14648 -4.56055 -3.93848 0.208008 11159, 11158.6, ! -0.414062 11184.7, 11178.7, ! -6.01172 11187.2, 11181.2, ! -6.01172 11188.7, 11186.6, ! -2.07324 11190.9, 11189.3, ! -1.6582 11196.7, 11193, ! -3.73145 11200.7, 11195.7, ! -4.97461 11204.4, 11198.4, ! -6.01172 11209.6, 11204, ! -5.59668 11213.1, 11206.9, ! -6.21875 11218.9, 11214.3, ! -4.56055 11221.6, 11215.8, ! -5.80469 11225.6, 11220.2, ! -5.38965 11231.4, 11225.6, ! -5.80371 11236.5, 11230.1, ! -6.42578 11238.2, 11230.9, ! -7.25488 11244.4, 11236.5, ! -7.87695 11247.7, 11239.9, ! -7.87793 11251.3, 11243.8, ! -7.46191 11260, 11249.8, ! -10.1582 11263.1, 11256.7, ! -6.42676 11266, 11262.5, ! -3.52441 11269.9, 11266.4, ! -3.52441 11273.5, 11273.7, ! 0.208008 11278, 11 275.7, ! -2.28027 11283.4, 11278.9, ! -4.56055 11285.5, 11280.9, ! -4.56055 11288.2, 11285.5, ! -2.69531 11289.8, 11289.6, ! -0.208008 11293.5, 11293.5, ! 0 11297.3, 11296.3, ! -1.03711 11305.9, 11300.5, ! -5.38965 11309.6, 11302.6, ! -7.04785 11312.3, 11304.2, ! -8.08496 11317.8, 11309.5, ! -8.29199 11322.4, 11313.7, ! -8.70605 11325.7, 11320.1, ! -5.59668 11327.6, 11321.5, ! -6.01172 11330, 11 323.8, ! -6.21875 11332.1, 11327.1, ! -4.97559 11334.4, 11329.2, ! -5.18262 11336.7, 11331.3, ! -5.38965 11338.7, 11335, ! -3.73145 11341.2, 11338.3, ! -2.90137 11344.1, 11342.1, ! -2.07324 11346.8, 11345.4, ! -1.45117 11354.9, 11348.7, ! -6.21875 11356.4, 11350.1, ! -6.21875 11358.9, 11353.9, ! -4.97461 11362.2, 11358, ! -4.14648 11390.9, 11390.9, ! 0 11394.5, 11393.2, ! -1.24414 11406.1, 11404.7, ! -1.45117 11423.9, 11419.4, ! -4.56055 11427.3, 11422.5, ! -4.76758 11436.8, 11435.3, ! -1.45117 11442.7, 11438, ! -4.76758 11451.4, 11440.9, ! -10.5723 11456.4, 11446.1, ! -10.3643 11458.9, 11447.7, ! -11.1934 11461.6, 11449.2, ! -12.4375 11463, 11 450.6, ! -12.4375 11465.5, 11452.3, ! -13.2666 11467, 11 457, ! -9.9502 11468.2, 11460.1, ! -8.08496 11471.8, 11462.4, ! -9.32812 11473.4, 11464.9, ! -8.49902 11476.3, 11467.8, ! -8.49902 11478.4, 11472, ! -6.42676 11480.7, 11475.1, ! -5.59668 11484.4, 11483, ! -1.45117 11486.3, 11484.8, ! -1.45117 11487.3, 11487.1, ! -0.208008 11488.5, 11489, ! 0.414062 11489.8, 11491.2, ! 1.45117 11492.7, 11495.2, ! 2.4873 11494.3, 11496.8, ! 2.48828 11495.6, 11498.1, ! 2.4873 11501.8, 11501.2, ! -0.62207 11504.3, 11506.4, ! 2.07324 11506.5, 11508.4, ! 1.86621 11508, 11509.4, ! 1.45117 11510.9, 11512.5, ! 1.6582 11514.6, 11514.6, ! 0 11516.3, 11516.3, ! 0 11521, 11520, ! -1.03613 11522.9, 11521.2, ! -1.65918 11524.1, 11522.3, ! -1.86523 11526.2, 11526.2, ! 0 11527.7, 11528.3, ! 0.62207 11530.8, 11530.4, ! -0.415039 11533.7, 11531.6, ! -2.07324 11545.7, 11545.3, ! -0.414062 11549.4, 11550.2, ! 0.829102 11550.6, 11551.6, ! 1.03613 11556.2, 11554.1, ! -2.07324 11573.9, 11569.4, ! -4.56055 11578.5, 11573.3, ! -5.18262 11599.1, 11593, ! -6.01172 11603, 11595.9, ! -7.04785 11605.7, 11600.5, ! -5.18262 11608, 11601.7, ! -6.21875 11610.5, 11603.4, ! -7.04785 11612.1, 11605.3, ! -6.84082 11614.6, 11607.6, ! -7.04883 11617.1, 11609.4, ! -7.66992 11620.2, 11611.3, ! -8.91406 11623.1, 11613.1, ! -9.9502 11625.6, 11614.6, ! -10.9863 11630.6, 11621.9, ! -8.70703 11634.3, 11626.4, ! -7.87695 11638.6, 11629.1, ! -9.53516 11640.3, 11632.2, ! -8.08398 11642.4, 11634.9, ! -7.46289 11644.2, 11636.2, ! -8.08398 11646.1, 11637.4, ! -8.70703 11649.9, 11639, ! -10.9873 11651.2, 11640.6, ! -10.5713 11653.5, 11642.7, ! -10.7793 11655.5, 11645.2, ! -10.3652 11657, 11 647.2, ! -9.74316 11659.3, 11650.4, ! -8.91406 11662, 11 652.4, ! -9.53516 11664, 11654.1, ! -9.9502 11667.4, 11657, ! -10.3652 11669.2, 11659.1, ! -10.1572 11671.7, 11663, ! -8.70605 11674, 11 664.7, ! -9.32812 11676.3, 11666.9, ! -9.32812 11677.7, 11669.6, ! -8.08496 11680.6, 11671.7, ! -8.91406 11685, 11 676.5, ! -8.49902 11688.1, 11678.5, ! -9.53516 11691.4, 11680.2, ! -11.1943 r 11695.1, 11683.1, 11698.2, 11685.6, 11705.1, 11693.5, 11715.6, 11701.5, 11719, 11704.9, 11720.4, 11706.5, 11722.5, 11708, 11725.6, 11711.5, 11729.5, 11713.8, 11733.3, 11717.7, 11740.7, 11727.7, 11742, 11729.5, 11742.6, 11732, 11745.7, 11734.1, 11748, 11737, 11750.7, 11740.5, 11754.8, 11744.2, 11758.1, 11747.1, 11760, 11748.4, 11761.9, 11750.5, 11763.3, 11751.9, 11767.7, 11756.5, 11770.4, 11758.7, 11773.9, 11762.3, 11777.2, 11766.6, 11780.3, 11769.5, 11784, 11774.9, 11786.7, 11777.6, 11788.3, 11780.2, 11790.4, 11782.3, 11799, 11785.7, 11803.1, 11789.2, 11838.3, 11827.7, 11849.5, 11839.8, 11858.1, 11845.1, 11863.1, 11851.1, 11866.2, 11855.7, 11873.7, 11865.8, 11883, 11871.2, 11885.9, 11873.5, 11888.2, 11876, 11891.1, 11878.5, 11893.6, 11880.1, 11897.1, 11884.1, 11900.4, 11887.1, 11902.9, 11889.4, 11905.6, 11891.7, 11907.2, 11893.5, 11909.5, 11898.3, 11915.5, 11907.8, 11916.5, 11909.7, 11919.9, 11912.4, 11925.5, 11917.4, 11947.6, 11940.2, 11972.5, 11965.5, 11977.5, 11972.9, 11988.6, 11979.3, 11995.9, 11983.4, 11998.8, 11987.6, 12001.1, 11989.4, 12003.1, 11991.3, 12005.6, 11993.4, 12010.8, 11998.6, 12015.8, 12003.5, 12023.9, 12012.5, 12028.7, 12019.6, 12031.8, 12023.3, ! -12.0234 ! -12.6455 ! -11.6094 ! -14.0957 ! -14.0957 ! -13.8887 ! -14.5107 ! -14.0957 ! -15.7539 ! -15.5469 ! -13.0596 ! -12.4375 ! -10.5723 ! -11.6084 -10.9863 ! -10.1572 ! -10.5723 ! -10.9873 ! -11.6084 ! -11.4004 ! -11.4014 ! -11.1943 ! -11.6084 ! -11.6084 ! -10.5723 ! -10.7793 ! -9.12109 ! -9.12109 ! -8.08496 ! -8.08398 ! -13.2676 ! -13.8887 ! -10.5723 ! -9.74316 ! -13.0596 ! -12.0225 ! -10.5713 ! -7.87695 ! -11.8154 ! -12.4375 ! -12.2305 ! -12.6455 ! -13.4736 ! -13.0596 ! -13.2676 ! -13.4746 ! -13.8896 ! -13.6816 ! -11.1943 ! -7.66992 ! -6.84082 ! -7.46289 ! -8.08496 ! -7.46289 ! -7.04785 ! -4.56055 ! -9.32812 ! -12.4375 ! -11.1943 ! -11.6094 ! -11.8154 ! -12.2305 ! -12.2305 ! -12.2305 ! -11.4-014 ! -9.12109 ! -8.49902 M 12034.1, 12025.8, 12061.6, 12052.5, 12064.1, 12055.2, 12071, 12061, 12074.3, 12063.9, 12080.1, 12071, 12081.9, 12073.4, 12088.6, 12081.9, 12090.9, 12084.2, 12092.9, 12085.3, 12114.3, 12101.7, 12115.8, 12103.5, 12117, 12104.4, 12138.8, 12134, 12150.8, 12143.1, 12153.5, 12149.6, 12156.6, 12151.8, 12160.5, 12154.5, 12168.2, 12164.9, 12175.7, 12169, 12176.5, 12171.1, 12181.5, 12173.8, 12183.8, 12175.7, 12186.1, 12177.6, 12190.6, 12180.7, 12192.3, 12185, 12201.3, 12193.4, 12203.2, 12195.3, 12213.5, 12201.1, 12215.2, 12203.4, 12218.1, 12206.5, 12221, 12210.2, 12223.3, 12212.5, 12227.2, 12214.8, 12237.1, 12223.8, 12240.4, 12226.7, 12242, 12228.1, 12243.9, 12230.2, 12246.2, 12231.7, 12247.5, 12234.1, 12249.4, 12236.1, 12260.4, 12247.5, 12262, 12250, 12264.1, 12251.7, 12266.4, 12253.3, 12269.3, 12255.2, 12271.8, 12256.6, 12274.7, 12259.1, 12275.7, 12261.8, 12277.6, 12264.3, 12280.7, 12267.2, 12282.1, 12269.1, 12284.4, 12272, 12285.8, 12273.7, 12292.6, 12278.9, 12298.6, 12286.4, 12303.6, 12292, 12307.9, 12296.9, 12323.2, 12313.5, 12336.9, 12321, 12340.9, 12325.1, 12349.5, 12336.9, 12358.2, 12342.9, 12361.3, 12347.4, 12364.8, 12351.8, 12367.3, 12353.9, 12371.1, 12356.3, ! -8.29199 ! -9.12109 ! -8.91406 -9.9502 ! -10.3652 -9.12109 ! -8.49902 ! -6.63379 ! -6.63379 ! -7.66992 ! -12.6455 ! -12.2305 -12.6445 -4.76855 ! -7.66992 ! -3.93848 ! -4.76758 ! -6.01172 ! -3.31641 -6.63379 ! -5.38965 ! -7.66992 ! -8.08398 ! -8.49902 -9.9502 -7.25586 -7.87695 -7.87695 ! -12.4375 -11.8154 -11.6084 -10.7803 -10.7803 -12.4385 -13.2666 -13.6816 -13.8887 -13.6816 -14.5107 -13.4746 -13.2666 -12.8525 -12.0234 -12.4385 -13.0596 -14.0957 -15.1328 -15.5469 -13.8887 -13.2666 -13.4736 -13.0596 -12.4375 -12.0234 -13.6816 -12.2305 -11.6084 -10.9873 -9.74316 -15.9609 -15.7549 -12.6455 -15.3398 -13.8887 -13.0596 -13.4746 -14.7178 12372.1, 12357.8, ! -14.3027 12374.4, 12360.1, ! -14.3027 12379.6, 12366.7, ! -12.8525 12383.1, 12369.2, ! -13.8896 12384.9, 12371.1, ! -13.8887 12400.6, 12389.6, ! -10.9863 12413, 12403.1, ! -9.9502 12418.6, 12404.9, ! -13.6816 12422.1, 12408.7, ! -13.4736 12424, 12410.7, ! -13.2676 12424.4, 12412.4, ! -12.0234 12429.6, 12415.5, ! -14.0957 12432.7, 12417.6, ! -15.1328 12434, 12419.9, ! -14.0967 12435.4, 12422.1, ! -13.2676 12440, 12428.6, ! -11.4014 12443.9, 12430.8, ! -13.0596 12445.3, 12433.1, ! -12.2305 12447.8, 12436.4, ! -11.4014 12452.6, 12440.5, ! -12.0234 12456.9, 12443.6, ! -13.2666 12460, 12447, ! -13.0605 12462.1, 12448.6, ! -13.4736 12464.6, 12451.1, ! -13.4746 12466, 12453.8, ! -12.2305 12468.1, 12456.1, ! -12.0234 12469.4, 12459, ! -10.3652 12473.2, 12462.8, ! -10.3643 12475.9, 12465.1, ! -10.7793 12486.6, 12476.7, ! -9.9502 12488.7, 12478.6, ! -10.1582 12501, 12494.9, ! -6.01172 12528.9, 12515.8, ! -13.0596 12530.5, 12517.7, ! -12.8525 12534.1, 12520.8, ! -13.2676 12544.8, 12528.5, ! -16.377 12556.7, 12543.6, ! -13.0596 12558.7, 12546, ! -12.6455 12560.5, 12547.9, ! -12.6445 12563.2, 12550.6, ! -12.6455 12565.1, 12553.5, ! -11.6084 12569, 12555.6, ! -13.4736 12570.3, 12556.8, ! -13.4746 12574.4, 12560.5, ! -13.8887 12579.4, 12565.1, ! -14.3037 12583.6, 12568.7, ! -14.9248 12589, 12574.1, ! -14.9248 12593.6, 12579.9, ! -13.6816 12599.2, 12585.1, ! -14.0957 12629.3, 12622.7, ! -6.63379 12639.7, 12633.4, ! -6.21875 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 759 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN 15 04B 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 15_04B APIN FN Prudhoe Bay Unit COUN North Slope Borough STAT Alaska *** LIS COMMENT RECORD *** ~~~~~!!~~!!!!!~!~!~ Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL provided by Schlumberger dated 28 Dec 2007. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 1 Size Length 4 4 4 4 8 Total Data Records: 79 Tape File Start Depth = 9568.000000 Tape File End Depth = 12865.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 Minimum record length: Maximum record length: 88 records... 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 15 04B.xtf LCC 150 CN BP Exploration (Alaska) WN 15 04B APIN FN Prudhoe Bay Unit COUN North Slope Boro STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAX GRAX GRAX 0.0 ROPS ROPS ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 2 ROPS MWD 68 1 F/HR Total Data Records: 158 Tape File Start Depth = 9568.000000 Tape File End Depth = 12865.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 167 records... Minimum record length: 18 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/12/25 1718748 Ol **** REEL TRAILER **** MWD 08/03/18 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 4 4 4 4 8 • Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP 9568.0000 -999.2500 -999.2500 9568.5000 -999.2500 -999.2500 9600.0000 96.1605 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 9900.0000 41.8654 38.8008 10000.0000 22.9000 16.7000 10100.0000 145.5794 36.3886 10200.0000 27.4605 49.8535 10300.0000 44.5249 59.8700 10400.0000 67.7596 17.4399 10500.0000 139.2198 120.2576 10600.0000 172.9977 180.8254 10700.0000 76.9677 169.6302 10800.0000 129.0160 42.6685 10900.0000 78.2385 37.6057 11000.0000 55.1169 119.7047 11100.0000 42.5806 28.6757 11200.0000 174.5993 6.7000 11300.0000 168.6409 50.3865 11400.0000 56.5891 75.2000 11500.0000 122.9632 61.5359 11600.0000 42.1560 113.2654 11700.0000 36.6215 64.7926 11800.0000 63.3105 85.0685 11900.0000 87.0786 60.0552 12000.0000 61.7482 130.6366 12100.0000 48.4163 101.0372 12200.0000 80.7322 55.3583 12300.0000 82.2573 47.9029 12400.0000 60.6637 79.4471 12500.0000 70.0763 65.8859 12600.0000 59.7686 64.7867 12700.0000 54.3197 66.0803 12800.0000 50.6594 74.7601 12865.0000 -999.2500 -999.2500 Tape File Start Depth = 9568.000000 Tape File End Depth = 12865.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • .7 Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9568.0000 -999.2500 -999.2500 9568.2500 -999.2500 -999.2500 9600.0000 94.8000 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 9900.0000 41.9000 35.5000 10000.0000 22.9000 16.7000 10100.0000 144.4000 36.8000 10200.0000 23.0000 49.8000 10300.0000 55.4000 19.5000 10400.0000 68.0000 17.5000 10500.0000 123.5000 125.2000 10600.0000 82.6000 189.5000 10700.0000 71.3000 154.6000 10800.0000 136.1000 42.3000 10900.0000 71.0000 32.2000 11000.0000 54.7000 121.4000 11100.0000 44.2000 30.7000 11200.0000 177.9000 33.7000 11300.0000 154.8000 43.8000 11400.0000 57.2000 74.3000 11500.0000 116.8000 66.7000 11600.0000 31.4000 95.3000 11700.0000 37.7000 84.1000 11800.0000 70.3000 91.9000 11900.0000 86.2000 62.9000 12000.0000 82.1000 117.7000 12100.0000 48.9000 110.7000 12200.0000 81.4000 57.2000 12300.0000 124.6000 35.8000 12400.0000 66.5000 69.8000 12500.0000 68.7000 87.6000 12600.0000 56.4000 91.8000 12700.0000 52.8000 49.8000 12800.0000 48.4000 101.0000 12865.0000 -999.2500 -999.2500 Tape File Start Depth = 9568.000000 Tape File End Depth = 12865.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet U Tape Subfile 4 is type: LIS • • **** REEL HEADER **** MWD 08/03/19 BHI Ol LIS Customer Format Tape **** TAPE HEADER **** MWD 07/12/18 1718748 O1 2.375" CTK *** LIS COMMENT RECORD *** !!~!!!!!!! !!!!!!!!! Remark File Version 1.000 !!!!!!!!!! !!!!!!!!! Extract File: ldwg.las Version I nformation VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9570.0000: Starting Depth STOP.FT 12120.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 15-04BPB1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 49.453"N 148 deg 34' 23.963"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 18 Dec 2007 API API NUMBER: 500292072670 Parameter Information Block #MNEM.UNIT Value Description #--------- --------- - -- - ------------------------ SECT. 22 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 63 Feet Above Perm. Datum DMF RF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 63 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. ~.:4, r i ~, ~,,~....x (2) All depths are Bit Depths unless (3) All True Vertical Depths (SSTVD) (4) All Formation Evaluation data is (5) Baker Hughes INTEQ utilized Coil' Advantage otherwise noted. are Subsea corrected. realtime data. Prak downhole tools and the surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to well 15-04B above the Kick Off Point (KOP) 10240 feet MD carrying the final shift from the KOP to the bottom logged interval. (8) Tied to 15-04 at 9600 feet MD (8414 ft. TVDSS) (9) The sidetrack 15-04B was drilled off a permanent whipstock set at 9806 feet MD (8419 feet TVDSS) through a milled window in 4 1/2 inch and 7 inch liner. Top of window 9808 ft.MD (8420 ft.TVDSS) Bottom of window 9816 ft.MD (8427 ft.TVDSS) (10) The interval from 12119 feet to 12142 feet MD (8841 feet to 8841 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma R ay [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth CURVE SHIF T DATA BASELINE, MEASURED, DISPLACEMENT 9570.49, 9571.53, ! 1.03613 9575.68, 9576.3, ! 0.62207 9577.96, 9578.58, ! 0.62207 9584.59, 9585.63, ! 1.03613 9589.57, 9589.77, ! 0.207031 9594.96, 9595.37, ! 0.415039 9597.86, 9597.86, ! 0 9599.72, 9599.52, ! -0.207031 9603.87, 9603.25, ! -0.62207 9605.94, 9604.7, ! -1.24316 9609.05, 9607.81, ! -1.24414 9610.5, 9610.29, ! -0.207031 9614.03, 9614.44, ! 0.415039 9618.38, 9619.21, ! 0.829102 9622.94, 9624.39, ! 1.45117 9646.36, 9645.54, ! -0.829102 9648.64, 9647.82, ! -0.829102 9652.17, 9651.96, ! -0.207031 9803.5, 9803.3, ! -0.207031 9810.59, 9808.72, ! -1.86621 9812.04, 9812.04, ! 0 9813.7, 9814.11, ! 0.414062 9814.94, 9815.98, ! 1.03711 9818.05, 9818.26, ! 0.208008 9822.2, 9821.99, ! -0.208008 9824.06, 9824.06, ! 0 9825.1, 9825.52, ! 0.414062 9826.76, 9827.17, ! 0.414062 9829.25, 9829.45, ! 0.207031 9830.08, 9830.28, ! 0.207031 9832.98, 9832.77, ! -0.207031 9835.26, 9834.43, ! -0.829102 9837.75, 9838.16, ! 0.415039 9840.03, 9841.06, ! 1.03613 9845.11, 9845.11, ! 0 9846.2, 9846.82, ! 0.62207 9850.14, 9850.76, ! 0.62207 9851.17, 9852, ! 0.829102 9855.11, 9855.73, ! 0.62207 9856.15, 9856.98, ! 0.829102 9857.39, 9858.22, ! 0.829102 9859.05, 9859.88, ! 0.829102 9863.82, 9864.03, ! 0.207031 9865.48, 9865.89, ! 0.415039 9867.76, 9869, ! 1.24414 9873.98, 9873.77, ! -0.207031 9879.16, 9878.12, ! -1.03613 9880.4, 9879.57, ! -0.829102 9882.06, 9881.23, ! -0.829102 9883.5, 9883.3, ! -0.207031 9889.72, 9889.93, ! 0.208008 9891.17, 9891.8, ! 0.62207 9892.21, 9893.66, ! 1.45117 9893.25, 9894.7, ! 1.45117 9897.19, 9898.22, ! 1.03613 9903.61, 9902.78, ! -0.830078 9907.34, 9907.14, ! -0.207031 9909, 99 09.21, ! 0.207031 9914.33, 9914.75, ! 0.415039 9916.61, 9916.82, ! 0.208008 9920.97, 9920.97, ! 0 9924.49, 9924.49, ! 0 9925.53, 9926.56, ! 1.03613 9926.77, 9928.22, ! 1.4502 9930.09, 9930.92, ! 0.829102 9931.54, 9932.58, ! 1.03613 9933.2, 9933.61, ! 0.415039 9934.23, 9934.86, ! 0.62207 9938.38, 9937.14, ! -1.24414 9939.42, 9938.79, ! -0.62207 9941.28, 9942.11, ! 0.829102 9943.15, 9943.98, ! 0.829102 9945.22, 9946.88, ! 1.6582 9949.99, 9949.99, ! 0 9970.1, 9968.85, ! -1.24316 9979.37, 9980.2, ! 0.829102 9990.15, 9989.32, ! -0.829102 9993.67, 9993.05, ! -0.62207 9997.6, 9997.81, ! 0.207031 10002.6, 10002.8, ! 0.207031 10004, 1 0004.6, ! 0.62207 10008.6, 10008.4, ! -0.207031 10017.2, 10017, ! -0.207031 10025.5, 10026.3, ! 0.829102 10029.2, 10029.8, ! 0.62207 10030.2, 10031.1, ! 0.829102 10032.3, 10033.4, ! 1.03613 10036, 1 0036.5, ! 0.414062 10039.4, 10039.6, ! 0.207031 10041.9, 10042.5, ! 0.62207 10047.4, 10047.4, ! 0 10049.1, 10048.4, ! -0.62207 10051.3, 10051.1, ! -0.208008 10052.6, 10053.4, ! 0.829102 10056.3, 10056.9, ! 0.62207 10058.2, 10058.8, ! 0.62207 10059, 1 0060, ! 1.03613 10060, 1 0060.9, ! 0.829102 10061,3, 10062.1, ! 0.829102 10064.6, 10065, ! 0.414062 10065,6, 10066.7, ! 1.03711 10067.7, 10068.3, ! 0.62207 10068.5, 10069.4, 10071.4, 10071.4, 10073.3, 10072.9, 10075, 10075.2, 10078.1, 10078.3, 10083.5, 10082.4, 10086.4, 10085.1, 10089.5, 10088.4, 10092.6, 10093.2, 10093.9, 10094.9, 10096.6, 10097.6, 10098.2, 10098.6, 10099.5, 10099.7, 10101.5, 10101.3, 10103.8, 10103.2, 10105.3, 10105.1, 10110, 10109.8, 10115.6, 10115, 10121.4, 10121.2, 10127.6, 10127.6, 10131.5, 10131.5, 10156.8, 10156.6, 10158.3, 10158.1, 10159.7, 10159.9, 10162.4, 10161.4, 10162.8, 10162.8, 10164.1, 10165.1, 10165.3, 10166.8, 10169.3, 10170.3, 10174.9, 10175.1, 10176.9, 10176.5, 10180.7, 10180.2, 10181.5, 10181.1, 10182.9, 10183.4, 10185.8, 10185.8, 10188.5, 10189.6, 10190.2, 10190.8, 10196, 10195.8, 10197.5, 10198.1, 10199.1, 10199.7, 10201.8, 10202, 10203.3, 10203.3, 10221.1, 10220.5, 10224.2, 10223.6, 10225.2, 10224.8, 10226.7, 10226, 10230.2, 10229.6, 10235.2, 10233.5, 10236.8, 10237.2, 10238.1, 10238.3, 10239.5, 10240.1, EOZ END 0.829102 0 -0.414062 0.208008 0.207031 -1.03711 -1.24316 -1.03613 0.621094 1.03613 1.03711 0.415039 0.207031 -0.207031 -0.62207 -0.208008 -0.207031 -0.62207 -0.207031 0 0 -0.208008 -0.207031 0.208008 -1.03613 0 1.03613 1.45117 1.03613 0.207031 -0.415039 -0.415039 -0.415039 0.414062 0 1.03613 0.62207 -0.207031 0.62207 0.62207 0.208008 0 -0.62207 -0.621094 -0.415039 -0.62207 -0.62207 -1.6582 0.414062 0.207031 0.62207 ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 Minimum record length: Maximum record length: 224 records... 10 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 15 04B PB1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 15_04B PB1 APIN FN Prudhoe Bay Unit COUN North Slope Borough STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to well 15-04B from the KOP 10240 feet MD and above carrying the final shift from the KOP to the bottom logged interval. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 61 Tape File Start Depth = 9570.000000 Tape File End Depth = 12120.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .002 1024 70 records... 54 bytes 4124 bytes *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 15 04B PBl.xtf LCC 150 CN BP Exploration (Alaska) WN 15 04B PB1 APIN FN Prudhoe Bay Unit COUN North Slope Boro STAT Alaska *** LIS COMMENT RECORD *** " " ~!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP GRAX GRAX GRAX 0.0 ROPS ROPS ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is; 0 Datum Frame Size is; 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length • 1 GRAX MWD 68 1 AAPI 2 ROPS MWD 68 1 F/HR Total Data Records: 122 Tape File Start Depth = 9570.000000 Tape File End Depth = 12120.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 131 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/12/18 1718748 O1 **** REEL TRAILER **** MWD 08/03/19 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 4 4 4 4 8 • • Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP 9570.0000 46.0000 -999.2500 9570.5000 41.5000 -999.2500 9600.0000 95.6000 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 9900.0000 42.0000 35.5000 10000.0000 22.9000 16.7000 10100.0000 144.8000 36.8000 10200.0000 22.8000 49.8000 10300.0000 31.7000 69.5000 10400.0000 119.2000 73.1000 10500.0000 76.0000 84.0000 10600.0000 94.4000 158.4000 10700.0000 106.6000 68.9000 10800.0000 106.0000 38.4000 10900.0000 132.4000 53.3000 11000.0000 94.6000 91.7000 11100.0000 119.1000 55.6000 11200.0000 88.0000 74.8000 11300.0000 47.7000 81.6000 11400.0000 104.0000 59.2000 11500.0000 69.7000 99.1000 11600.0000 97.4000 73.2000 11700.0000 109.6000 87.2000 11800.0000 78.0000 58.6000 11900.0000 48.2000 132.3000 12000.0000 74.3000 84.5000 12100.0000 97.2000 37.0000 12120.0000 -999.2500 55.4000 Tape File Start Depth = 9570.000000 Tape File End Depth = 12120.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9570.0000 46.0000 -999.2500 9570.2500 45.3000 -999.2500 9600.0000 95.6000 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 9900.0000 42.0000 35.5000 10000.0000 22.9000 16.7000 10100.0000 144.8000 36.8000 10200.0000 22.8000 49.8000 10300.0000 31.7000 69.5000 10400.0000 119.2000 73.1000 10500.0000 76.0000 84.0000 10600.0000 94.4000 158.4000 10700.0000 106.6000 68.9000 10800.0000 106.0000 38.4000 10900.0000 132.4000 53.3000 11000.0000 94.6000 91.7000 11100.0000 119.1000 55.6000 11200.0000 88.0000 74.8000 11300.0000 47.7000 81.6000 11400.0000 104.0000 59.2000 11500.0000 69.7000 99.1000 11600.0000 97.4000 73.2000 11700.0000 109.6000 87.2000 11800.0000 78.0000 58.6000 11900.0000 48.2000 132.3000 12000.0000 74.3000 84.5000 12100.0000 97.2000 37.0000 12120.0000 -999.2500 55.4000 Tape File Start Depth = 9570.000000 Tape File End Depth = 12120.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS