Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
207-167
STATE OF ALASKA R lik,LASKA OIL AND GAS CONSERVATION COMMI EC E'V REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed OCT 2 3 201? Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate 0 Alter Casing 0CIAO r' ��.`� r`'m ID Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Milled CIBP IZ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 207-167 3. Address: P.O.Box 196612 Anchorage, Development I1 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22585-02-00 7. Property Designation(Lease Number): ADL 0028305 8. Well Name and Number: PBU 18-32B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11376 feet Plugs measured feet true vertical 8704 feet Junk measured 11308 feet Effective Depth: measured 11336 feet Packer measured 3936 feet true vertical 8704 feet Packer true vertical 3796 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 36-116 36-116 1490 470 Surface 3795 10-3/4"45.5#L-80 35-3830 35-3707 5210 2480 Intermediate Production 9189 7-5/8"29.7#S-95 34-9223 34-8226 8180 5120 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9870-10110 feet 10160-10310 feet 10350-10470 feet 10560-11330 feet True vertical depth: 8700-8709 feet feet 8708-8709 feet 8711-8712 feet 8712-8704 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 36-4017 36-3863 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED DEC 2 7 2017, Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 302 6195 716 800 398 Subsequent to operation: Shut-In 30 130 14.Attachments:(required per2o AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development (3 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ ❑ SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stone,ChristopherContact Name: Stone,Christopher Authorized Title: DS)&18 PE / Contact Email: Christopher.Stone©bp.com Authorized Signature: ..3.147.4.----- .�►� Date: ((U2,3 /.- Contact Phone: +1 907 564 5518 7 Form 10-404 Revised 04/2017 /Z / /7 117-7 . /7i/7'!1 7"-- RB DMS `L/(r 2 5 2017 Submit Original Only • Ode .p .,OP-y Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary October 23, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Milling and Pushing Down Hole of a Cast Iron Bridge Plug on Well 18-32B, PTD # 207-167. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • a) o• 0 0 0 0 0 0 0 O CO N CO O CO O O Lo co O N LC) N N L.0 c3 co t1) O N Ln CO CO co 1� f` U 5 0 0 0 0 0 0 0 0 0 O O ti. O a0 co V' 71- M (O • " N '- N- V N- N- co 'Cr Ca O CO r co N- N- a0 cooCO 1- M '- N N- N r- N- t CO O N CO N- CO N- O 7-- C) C) co 1- N a0 O) O O) N- O r` ti CO CO a0 CO 1- r` N- OD CO 00 CO CO I- O r CO N '- lf) N- CO LC) L0 CO CO ice- CO O) r- O CO CO CO CO CO CO 0) 6) 0) 0) O 1- CO co co N- N- N- N- co co ice+ Q) O O CO O) N CO CO 09 O) 1 N- COE N CO .-- N a0 N O O) O) O) CNJ c2 O CO O d CO CO co a0 T- O t) o M 1 1 1 1 1 , 1 1 1 1 1 , 1 1 i-+ W • i-1 QN N 6) in co O) O) In (O Ln CO O x- N M Ln O CO M CO O O O O O) O) O) O M C co V V' CO co co CO a0 •_ r • M_ W rt L 0 0 0 0 0 0 CO O CO CO CO CO CO 00 co C) i4t J J J J 4$ C co N - $ �$ c (Nr co I# •L/) • v O N- CN %-- N O CO CO (O N - - CO U -• co O M N N ' (`O CO - N O to (rj co 1- V V (h N CO• O O CO 1- r` CO N- O Cr C` CO C Co N !- N CO M '- N N '- O G) CO O V N J Z a)0 O '5• 000 Z p W W w W W W W W O J D Z Z Z Z Z Z Z Z D O (n 0_ J J J J J J J J H • S U 0 c O VJ L Q U V I M • a. (1) a• d) L ^M LL Y Y RS N m CO CV N N r r a i E V < > 00 LO CO H ao O) N M CO CO f— /^ a0 C'^) V/ m a Co G) C:1orn CD ch v o0 v Co a cr Y � � cu Lu • QYY >+a. 0 0 ~ 0 a a m a) E CO CO CO cp N N N Z c'" CO CO CO U, • 0 / / ?f \ 0a_/ 2 � � § 3 \ / G G E 5 ° o G 7 E E o a] E = _ _c G = a = # = © . ' / \ \ $ R R -C L_ i g / © � ° f G ® £ 2 a 7 - = e ® = o » CU `- \ \ E E § D p m 5 m § _C c b E @ E 0 m 5 \ / $ ■ _ E E ° CD 3 E0 -0 0 o_ » \ @ 4\ § 2 2 < ^ / \ \ / E \ ■ 4 0 / ee0egg 2 >, 0. 2 (0 (7) m O 2 \ \ % § E » 9 \ E 8 § § 2 5 o — 3 0 C? y / % m 6 2 03 \ / /207 \ + = m 6 a ° -I / o § / % O o 0- ƒ o © -o \ 0 a / 0. ° z F o @ 0 E = .a e = R 2 § \ / / \ ) 2 I c E / e o \ / — \ � 2$ \ ea\ \= � % / )\ / � \ L° 6 2 O c Cl_ H o E \ u v- \ 5 $ § § $ >,I- / U \ / \ .E E \ 2 2 / y 2 coon / 22 Lo 2 ±_ Lc) a g / \ & n 22 \ \ L Ha >- / (r) N_ H \ � � � 0 a < TREE= aw VAELLJ-EAD FRAC 1 8-32 B SA , NOTES: WELL ANGLE>700 e 9808' ACTUATOR ***CHROME TBG& SCAB LNR*** BAKER C: OKB.ELEV 54.0 I - ._.. BF.ELev; , ' 201W -4-1/2"FES X RIP,ID=3 813" Max Angle,- 92'II 10851' GAS LFT MANDRELS Datum OA)= NIA ST FAD TVD DEV TYPE VLV LATCH FORT DATE btiiTtiii-7-----iiiiiciSs / I N lik1 216f 1 2999 2982 21 KBG2 DMY BK 0 03i10/15 20-CoNDUCTOR,94#,1+450,13= 19.124" H -iio' ______44 10-3/4"CSG,45.5#,L-80 BTC,ID=9.953' - 3830' • 3900' -4-1/2"HES X NP,ID=3.813" Minimum ID =2.387" @ 10206' Z 3920' H7-5/13"X 4-1/2"BKR S-3 PKR,ID=1880' 3-3/16" X 2-7/8" X0 • II 3944 -4-1/2"FES X NP,ID=3.813" 4-1/2'TBG,12.6#,13CR-80 VAM TOR NSCT, H 3996' 3996' -7-5/8'X 5-1/2"BTC FLEXLOCK LW , ------- la .0152 bpf,ID=3_958" '1 w/LNR HGR 13=4.850' r r. TOP OF 4-1/2"SCAB LM R - 4024' 4001' H4-1/2'MULF_SHDE,D=4.00" • • •- _ 0 sr, 4022' ---i5-1r2-x 5"X0,ID=4.40" .% .•' .0 0 .% .0 •' 4023' -{5"X 4-1/2'X0,ID=3.92' •' ‘IZ 0 4-1/2'SCAB LW, 12.6#,13CR-80 13T-M, - 8896' ic 8905' H7-5/8'X 5-1/2TIW LTP,I3=4.880" . IP 0158 bpf, U3.958' I 1 8916' H7-5/8"X 5-1/2"TIW LNR HGR,ID=41163" ------ ---.---- 8921' H5-1/2"X 4-1/2'XID,ID=3.958' TOP OF 4-1/2-Lf,Ft - 8921' -13-1/2"BTT CEPLOY SLV,ID=3.00" . , .. 4 8948' -3-1/2"HOWCO X R.13,ID=2.813" 1 3-1/2"LNR 9.2#,L-80 STL, 0087 bpf,D=2.992" - 8959' 4- ...r 8959' --I 3-1/2-X 3-16"XO,ID=2.786' - 7;4 7-5/8'LlsR 297#, S-95, .0459 bpf,ID=6.875' H 9223' --All 4r. il lk 4-1/2"WI-IPSTOCK(02/12/08) - 9240' , 4-1/2"LW, 12.6#, L-80 NSCT,.0152 bpf,E:4=3.958" -1 -9248 1..... . RALLOUT WINDOVV(18-32B) 9240-9248' PERFORATION SULOARY REF LOG: EM CN_/GRica_ON 02/27/08 ANGLE AT TOP FEW 86°@ 9870' We,Refer to Production CB for historical perf data I SIZE SFF INTERVAL Opn/Sqz S1-QT - SQZ 2" 6 9870- 10110 0 02/27/08 10205' -I3-3/16"X 2-718"XO,ID=2.38r 2' 6 10160- 10310 0 02/27/08 2' 6 10350- 10470 0 02/27/08 2" 6 10560- 11330 0 02/27/08 I 3-3/16"LINER,6.2#,L-80 Tat,.0076 bpf,ID=2.80" -1 10205' 1 R3TD — 11336' I 11308'Cl7A -I FISH:CIBP FUSEE)DH(09/25/17) 2-718'LNC 6.16#,L-80 s-n,.0058 bpf,I)=2.441' -I 11375' of DATE REV BY COMENTS 7, DATE REV BY 000.0.ENTS FRIJOHOE BAY UNT 10/03/95 D-09 ORIGINAL COMPLETION ',10/11/13 JOANJI.0 SET WFT CIBP(10/09/13) WELL: 18-32B 06/26101 N3ES CTD SIDETRACK(18-32A) 03/10/15 fl-4 PJC MY GLV Ff3R4T No: 2071670 12/28/07 N4ES R1140 '09/27/17 CILW/J14C t.....LED&FUSFED CBP 108Th-RSH AR No: 50-029-22585-02 02/28/08 NORDIC i CID SIDETRACK(18-328) SEC 24,T11N,R14E,3632'FSL&41'FEL 03/09/08 KSB/PJC GLV CIO(03/05/08) , 04/01/11 PJC CRLG DRAFT CORRECTIONS BP Exploration(Alaska) • • Image Project Well Mistory File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - ~ ~ ~ Well History File Identifier Organizing (done) RE AN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: BY: Maria _ Project Proofing BY: Maria _ Scanning Preparation BY: __ Maria x30= Date: ' ae«,~~eeaea iiiiuiiiuuiiui OVERSIZED (Scannable) ^ Maps: ^ Other Items. Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ P luullllll~llllu mP l`' / lf-~' ® + ~-~ = TOTAL PAGES ~~ (Count does not include cover sheet) ~' !s/ Production Scanning / `/ ' IIIII~IIIIIIIIVIII Stage 1 Page Count from Scanned File: ~ ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: I ~ ~ ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II I I III ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked III IIIIII III III III Date: o..o.cea iuuiuuuuiuu DIGI AL DATA Diskettes, No. I ^ Other, No/Type: Date: 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ` AL ,.A OIL AND GAS CONSERVATION COMM- .JN �d ',./ r i ., REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Repair Well❑ Plug Perforations U Perforate LJ Other❑ Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WOO 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 207-167-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22585-02-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028305 s PBU 18-32B • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 11376 feet Plugs measured 10520 feet true vertical 8703.91 feet Junk measured None feet Effective Depth measured 10520 feet Packer measured See Attachment feet true vertical 8711.72 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 36-116 36-116 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 9189 7-5/8"29.7#S-95 34-9223 34-8226.19 8180 5120 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9870-10110 feet 10160-10310 feet 10350-10470 feet 10560-11330 feet True Vertical depth 8699.62-8708.57 feet 8707.6-8708.59 feet 8711.35-8712.24 feet 8712-8703.66 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 36-4017 36-3862.79 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED c;,-,. :s Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure• Prior to well operation: 393 37816 9 0 1577 Subsequent to operation: 469 11875 12 0 1055 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development El - Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0• Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCO 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Gar .Catron • BP.Com Printed Name Garry Catron Title PDC PE Signature dd Phone 564-4424 Date 11/6/2013 7....._V / l RBDMS NOV - '" Form 10-404 Revised 10/2012 /2/// 2/ ` 3 Submit Original Only �1/lty Packers and SSV's Attachment ADL0028305 SW Name Type MD TVD Depscription 18-32B PACKER 3936 3741.54 4-1/2" Baker S-3 Hydro Set Packer 18-32B PACKER 4012 3804.64 5-1/2" Baker LT Packer 18-32B PACKER 8905 7911.87 5-1/2"TIW Packer 18-32B PACKER 10004 8652.15 4.5" Baker CTC Packer CI) O g0000 U m ti W - c M 00 CO c0 r . 0) 0) COv' N � 0) 0 O N- CD OD N N N 0)•• ed.: K2 M CO N." N 00000)) 00) 00) OOOOON OOOp M I— f— I■ 0000 0 0 00 M M QI I I I I I I I I m o ,r 0) 0) 0) 0) N CO O CO I. O 0 N CO 00 0 v- 4 ,- 0) T' 0000 M to 0 CO f- 00 0 v- O M M M M 0 0 O) 0) 0) 0) 0 co M M 0) 0) 0) 0) 00 CD V 000000000 � ODCDC07M 'Cr mC Q M N00NMO) O) 00 W W MO ,— NMO NJ- 0000 ON M O O 0) 0) 0) 0) 0) N M M M M C o v wODODcow 0 Q O O O C C) 0 0 00D \ CD 000 00 000 000 0D C) 03 CD OD 00 J J J* 0 * * , N CV CO 0 up up up c Cl) N 0 r _ _ _ - _ CO .. ..N N U 0 i4 N � � NNv- w -0\D � �m C4 N to to 6 M AN O O , r r t _ _ O 0) 0) 00 N- O V. 0) 0 0 0 0 C0DN00 O "— NN V.. V. f� I- 0 J N r- 0 C'M M M z O cs) 1- ww eED aQ � � W W W W W W W W O LL IL Z V z w w w w w w w w O w r m O z z z z z z z z c » D q H b E / _ 2E © &o Ea % / 3 / E �' - \ $ / I � � / \ / - ƒ g c 2 0 Q E c g c !! UIai O � E N E 6 — R / ƒ gf ƒ « \ a) co $ 2 I - s q 5 q CL ƒ 0_ k 7 \ + o i \ o » = E E & t o O a / 5 \ a ® / o O , / \ / \ / k / ) J / -C) U) / 0 C > w U rn CO e = i= 0 2 6 ¢ C $ / 6 .\ § co 0 O = R o O A ' @ 6 -, n / / H 2 < C o a \ / / ) $ \ ƒ \ 2 / � � �/ � CL _ _ - _ � _ _ _ E > • G / $ C 7 / \ - e S ain 4t 0 0 4 0 o 0 I I O \ D m c v 2 $ C 2 / ? O O 2 0 \ c v \ / \ v v1- 000v /r n r , • a a) a @ r _ `I" 1 8 3 2 B S TES: WELL.ANGLE*70° A WELL/EAD= FMC - @ 9808' ACTUATOR= BAKER C CHROME TBG&SCAB LNR` OK13.ELEV== 54.0' , BF.�= KOP 260T , 2019' -41/2"HES X NP,ID=3.813" Max Angle= 92°@ 10851' GAS LFT MANDRELS Datum MD= WA _ ST MD ND DEV TYPE VLV LATCH PORT LATE Datum ND= 8800'SS t `y 1 2999 2982 21 KBG2 SO BK 20 03/05/08 20'CONDUCTOR,94#,H-450,D=19.124" - 110' ■ 10-3/4"CSG,45.5#,L-80 BTC,D=9.953" - 3830' 3900' 4-1/2"FE5 X NP,D=3.813" Minimum ID =2.387" @ 10206' ® x3920' H7-5/8"X 41/2"BKRS-3 PKR,D=3.880" 3-3/16" X 2-7/8" XO • r { 3944' -4-1/2"HES X NP,D=3.813" 4-1/7 TBG,12.6#,13CR-80 VAM TOP/NSCT, --I 3996' 111 - 3996'3996' H 7-5/8"X 5-1/2"BTC FLEXLOCK LTP .0152 bpf,D=3.958" ® ® w/LNR HGR D=4.850" TOP OF 4-1/2"SCAB LNR H 4024' •�I ►�\p 4001' H4-1/7 MULESHOE,D=4.00' ►••• �� ►�•� ►• 4022' 1-15-1/2"X 5"XO,ID=4.40"• ►•••• e• 4023' 1-15"X 4-1/2"X0,D=3.92" 4-1/2"SCAB LM, 12.6#,13CR-80 BT-M, 8896' .E- �!% al --17-5/8"X 5-1/2"71W LIP,D=4.880" .0158 bpf, D=3.958" 8916' H 7-5/8"X 5.1/2"TM/LNR HGR,D=4.863' TOP OF 4-1/2"LNR - 8921' __� 8921' H5-1/2"X 4-1/2"XO,D=3.958' • 8938' --13-1/2"BTT DEPLOY MENT SLV,D=3.00" 4 8948' 1-3-1/2"HOWCO X NP,D=2.813" • 3-1/2"LW,9.2#,L-80 STL,.0087 bpf,ID=2.992" -1 8959' i r 8959' -13-117 X 3-16"XO,D=2.786" ►4 ►4 • ►4 • 7-5/8'LNR,29.7#,S-95,.0459 bpf,D=6.875" H 9223' 1-I .0j r ' ► •. ►� 4-1/2"VWI STOCK(02/12108) H 9240' • 4-1/2"LNR, 12.6#,L-80 NSCT,.0152 bpf,D=3.958" -I ^-9248 k PERFORATION SUM/ RY MLLOUT WIDOW(18-3213) 9240'-9248' REF LOG:ME M CNJ GR/CCL ON 02/27/08 , ANGLE AT TOP PERF: 86°@ 9870' Note:Refer to Production 08 for historical perf data SCE SPF INTERVAL Opn/Sqz SHOT SQZ 2" 6 9870-10110 0 02/27/08 10205' H 3-3/16'X 2-7/8"XO,D=2.387" 2" 6 10160-10310 0 02/27/08 II 2" 6 10350-10470 0 02/27/08 2" 6 10560-11330 C 02/27/08 _ 10520' -12-7/8"VVFDCBP(10/09/13) 3-3/16"LNR,6.2#,L-80 701,.0076 bpf,D=2.80" H 10205' I FSTD - 11336' 2-7/8"LNR,6.16#,L-80 STL,.0058 bpf,D=2.441' -I 11375' d4� DATE REV BY COMMENTS DATE REV BY COARA3ITS PRIDHOEBAY UNIT 10/03195 0-09 ORIGINAL COMPLETION 04/01/11 - PJC DRLG DRAFT CORRECTIONS WELL: 18-32B 06/26/01 N3ES CTD SIDETRACK(18-32A) 10/11/131 JDM/JMD SET WFT CBP(10/09/13) PERMIT No: 2071670 12/28/07 N4ES RWO AR No: 50-029-22585-02 02/28/08 NORDIC 1 CTD SIDETRACK(18-32B) SEC 24,T11 N,R14E,3632'FSL 8 41'FEL 03/09/08 KSB/PJC GLV GO(03/05/08) 10/12/09 ?/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) r ; '~~,~ ~~ .- ~ ~''~ ~~. ~ =~ ~.y~ ~~;.~~ W ,_ ~,~ ~' '~ ~~N,. MICROFILMED 6/30/201 0 DO NOT PLACE ANY NEW MATE RIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc DATA SUBMITTAL COMPLIANCE REPORT 1 /7/2009 Permit to Drill 2071670 Well Name/No. PRUDHOE BAY UNIT 18-32B Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22585-02-00 MD 11376 TVD 8704 Completion Date 2/28/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Direction al Surve Ye DATA INFORMATION Types Electric or Other Logs Run: (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name .Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 9176 11376 Open 3/10/2008 I'/Kpt Directional Survey 9176 11376 Open 3/10/2008 iCog Neutron Blu 8740 11246 Case 4/28/2008 MCNL, GR, CCL, CNL 26- / vEl C Lis 16164' Neutron 8729 11255 Case 4/28/2008 Feb-2008 LIS Veri, GR, CNT ',~t LIS Verification 9158 11377 Open 5/19/2008 LIS Veri, GR, ROP, RAD, ~ ~ ' ' RAS, RPD, RPS ' ~ ED C Lis 16275- Induction/Resistivity 9158 11377 Open 5/19/2008 LIS Veri, GR, ROP, RAD, , RAS, RPD, RPS !, ~/o~ Gamma Ray 25 Col 9260 11376 Open 5/19/2008 MD GR ~ Log Induction/Resistivity 25 Col 9260 11376 Open 5/19/2008 MD IND, RES, GR I~ ~g Induction/Resistivity 25 Col 9260 11376 Open 5/19/2008 TVD IND, RES, GR ~og See Notes 2 Col 9150 11350 Open 5/19/2008 Depth Shift Monitor Plot Well Cores/Samples Information: - Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION W ll C d? Y a D il Hi ~/ N e ore a y story Receive d? ~ Chips Received? ~Y-LN ~ Formation Tops l;A' N Analysis l~'/-1~ Received? DATA SUBMITTAL COMPLIANCE REPORT 1/7/2009 Permit to Drill 2071670 Well Name/No. PRUDHOE BAY UNIT 18-32B Operator BP EXPLORATION (ALASKA) INC MD 11376 TVD 8704 Completion Date 2/28/2008 Completion Status 1-OIL Current Status 1-OIL Comments: API No. 50-029-22585-02-00 UIC N Compliance Reviewed By: __ __ _ __ __ Date: ____ ` ~ ~~. STATE OF ALASKA ~ -5~~~`~'~ ALASKA~IL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Ab 2/28/2008 12. Permit to Drill Number 207-167 i 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 2/19/2008 ~ 13. API Number 50-029-22585-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 2/24/2008 ~ 14. Well Name and Number: PBU 18-32B ° 1647 FNL, 41 FEL, SEC. 24, T11N, R14E, UM Top of Productive Horizon: 1434' FNL, 3771' FWL, SEC. 19, T11 N, R15E, UM 8. KB (ft above MSL): 54' / Ground (ft MSL): 16.2' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1377' FNL, 317' FWL, SEC. 20, T11 N, R15E, UM 9. Plug Back Depth (MD+TVD) 11336 8704 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 691737 y- 5960219 Zone- ASP4 10. Total Depth (MD+TVD) 11376 • 8704 16. Property Designation: ADL 028305 TPI: x- 695542 y- 5960532 Zone- ASP4 Total Depth: x- 697042 y- 5960628 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information p r 20 AAC 25.071): MWD DIR / GR, MCNL / GR / CCL ~//~1/~~~/ ~ .~~~ ;,tJ~ ~1,~9.6S~rY.D 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP :BOTTOM TOP ' ` BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 urface 110' Surface 110' 30" 260 sx Ar i Set A rox. 10-3/4" 45.5# NT-80 Surface 3830' Surface 3707' 13-1/2" 1283 sx PF'E 212 sx Class'G' 7-5/8" 29.7# USS-95 Surface 9223' Surface 8226' 9-7/8" 295 sx Class 'G' 4-1/2" 12.6# 13Cr80 39 6' $ 02' 3845' 7963' Sca Lnr 774 sx Class 'G' 5-1/2" x 4-1/2" 17#! 12.6# L-80 8916' 9240' 7975' 8240' 6-3/4" 220 sx Class 'G' a-v2° x 3-31,6° X zara^ s.zn i s.zu i s., s# L-80 8938' 11375' 7994' 8704' 4-1 /8" 251 sx Class 'G' 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH .SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr80 4001' 3920' MD TVD MD TVD 9870' - 10110' 8700' - 87119' 10160' - 10310' 8708' - 8709' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. . 10350' - 10470' 5711' - 8712' DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 10560' -11330' 8712' - 8704' 2300' Freeze Protect w/ 35 Bbls of Diesel 26. PRODUCTION TEST Date First Production: March 11, 2008 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date Of Test: 3/18/2008 HOUfS Tested: 12 PRODUCTION FOR TEST PERIOD OIL-BBL: g26 GAS-MCF: 7,596 WATER-BBL: -0- CHOKE SIZE: 75 GAS-OIL RATIO: 9,204 Flow Tubing Press. 1,137 CaSing PfeSS: 1,200 CALCULATED 24-HouR RATE..' OIL-BBL: 1,651 GAS-MCF: 15,192 WATER-BBL: -0- OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAG 254wQ71. None _ !~f Zvi G Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE 4 ~~ag~ ~~ ~ 'e'n' '~ " LUUO r ~'y~~~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN eRS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Tested . ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Shublik A 9230' 8232' None Shublik B 9251' 8248' Shublik C 9267' 8261' Sadlerochit 9299' 8285' 42SB /Zone 4A 9360' 8335' Top CGL /Zone 3 9413' 8384' Base CGL /Zone 2C 9485' 8453' 23SB /Zone 26 9555' 8519' 22TS 9604' 8562' 21 TS /Zone 2A 9646' 8597' Zone 1 B 9725' 8651' TDF /Zone 1A 9809' 8688' Formation at Total Depth (Name): TDF /Zone 1A 9809' 8688' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~2 ~ O `~ 2.7/~ Si d / gne Title Drilling Technologist Date Terrie Hubble 666 PBU 18-328 207-167 Prepared By NameMumber. Te-rie Nubble, 564-4628 Well Number Permit No. / A royal No. Dulling Engineer: Greg Sarber, 564-4330 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only .. _+._ ~~' `. O' BP EXPLORATION Page 1 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations -- 2/16/2008 16:00 - 22:30 -- 6.50 MOB - - P - - PRE - Move rig from DS15 to DS18. Derrick up rig move. 22:30 - 22:45 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for backing over well. 22:45 - 23:00 0.25 MOB P PRE Back over well with no problems. Lower rig to ground. 23:00 - 00:00 1.00 MOB P PRE ACCEPT RIG ON DS 18-32B AT 2300 HRS, 02/16/2008. Start general rig up of equipment. 2/17/2008 00:00 - 03:00 3.00 BOPSU P PRE Continue NU BOP stack and prepare for BOP test. 03:00 - 04:45 1.75 BOPSU P PRE Start low pressure BOP test. Door seal failed, bleed off pressure and replace. 04:45 - 10:30 5.75 BOPSU P PRE Resume BOPE ressure test. AOGCC witness waived by inspector John Crisp. Send BOPE pressure test report to AOGCC. 10:30 - 10:45 0.25 BOPSU P PRE SAFETY MEETING. Review procedure, hazards and mitigation for R/U BPV Lubricator, PT and Pull BPV. 10:45 - 12:45 2.00 BOPSU P PRE Ri u BPV lubricator, ress test to 1500 si, ull BPV. Rig down lubricator. Well on a slight vac. 12:45 - 13:00 0.25 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for cutting coiled tubing with hyd cutter. 13:00 - 15:00 2.00 STWHIP P WEXIT Rig up hyd cutter and cut off 100' of coiled tubing for pipe management. J \s M/U BTT CTC and pull test w/ 40K. Fill rig pits with 2# Biozan / 2% KCL water. Circ. 7 BBL, Press test inner reel valve at 250/3500 psi. Good test. Fill coil and press test CTC. Good test. ~ 15:00 - 15:15 0.25 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and ~ mitigation for M/U BTT window milling BHA. 15:15 - 16:00 0.75 STWHIP P WEXIT M/U BTT 3.80" window milling BHA #1 with 3.80" HCC Diamond mill, string reamer, Xtreme motor, Circ sub, Hyd Disc, XO, 2 jts PH6, XO, Checks and CTC. BHA OAL = 84.55'. 16:00 - 18:45 2.75 STWHIP P WEXIT RIH with window millin BHA #1. Circ at 0.2 bpm. Take returns to Tiger tank. Well is dead. Up wt at 9200' = 38K. Ease down while Circ Biozan around. Ta whi stock inch oint at 9232.5'. Correct de th to 9240'. ~ 18:45 - 00:00 5.25 STWHIP P WEXIT Mill 3.80" window thru 4-1/2" liner. 2.5 bpm, 3100 psi, full returns, 1.0 fph. 19:15 - 9240.4 ft, 2.5 bpm / 2,130 psi / 13 Klbs CT weight 20:00 - 9241.2 ft, 2.5 bpm / 2,270 psi / 12.7 Klbs 21:00 - 9242.5 ft, 2.55 bpm / 2,500 psi / 10 Klbs 22:00 - 9243.3 ft, 2.52 bpm / 2,300 psi / 11.8 Klbs 23:00 - 9244.8 ft, 2.51 bpm / 2,320 psi / 12.7 Klbs 2/18/2008 00:00 - 01:45 1.75 STWHIP P WEXIT Continue milling window. 00:00 - 9246.1 ft, 2.5 bpm / 2,300 psi / 12.8 Klbs 01:00 - 9247.4 ft, 2.5 bpm / 2,340 psi / 12 Klbs 01:45 - 03:30 1.75 STWHIP P WEXIT Pick up to check weight. Weight is 34 Klbs, off bottom pressure is 2,200 psi at 2.5 bpm. Work back down slowly to resume window milling. 02:00 - 9247.8 ft, 2.57 bpm / 2,430 psi / 12.4 Klbs. 03:00 - 9248.8 ft, 2.6 bpm / 2,550 psi / 11.9 Klbs. Estimated BOW at 9248.2 ft. Printetl: 3/12/2008 11:47:23 AM BP EXPLORATION Page 2 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: i Date From - To Hours Task Code NPT Phase ~, Description of Operations 2/18/2008 03:30 - 05:00 1.50 STWHIP P 05:00 - 05:50 0.83 STWHIP P 05:50 - 06:05 I 0.251 STWHIPi P 06:05 - 08:15 2.17 STWHIP P 08:15 - 08:45 0.50 STWHIP P 08:45 - 09:00 0.251 CASE I P W EXIT Drill rathole to 9,260 ft. Small amount of sand in returns. W EXIT Pick up for reaming pass. Up weight is 36 Klbs. Perform 3 passes with no motor work or weight bobbles seen. W EXIT Pick up a final time and shut down pumps for dry tag. Dry pass is good, nothing seen down to 9,255 ft. W EXIT POOH. circ at 2.3 bpm, 1900 psi. W EXIT Lay out milling BHA. Both mills were 3.79" No-Go and 3.80" Go. RUNPRD SAFETY MEETING. Review procedure, hazards and 09:00 - 11:45 2.75 CASE P RUNPRD Run guide shoe, float cllr, 1 jt 2-7/8" stl, flt Cllr, pup jt, Landing cllr and 9 jts, 2-7/8" STL tubing. Run XO and 17 jts of 3-3/16" TCI I tubing. Run XO, 10', 3-1/2" STL pup jt, X Nipple, 4' Pup jt and BTT SELRT. M/U BTT XO, Hyd Disc, locking swivel and CTC. Liner total length = 845.77'. Liner and running tools OAL = 856.02'. 11:45 - 12:30 0.75 CASE P RUNPRD RIH with liner on BTT running tools. Circ at 0.25 bpm, 700 psi, SSSV at 2,019'. Land flutted No-Go in SSSV at 2,024'. Up wt = 14K no pump. 4K down wt. Circ. 1.9 bpm, 1800 psi. 12:30 - 13:15 0.75 CASE P RUNPRD Pick up to ball drop depth. Insert 5/8" Steel ball and displace with 2# Biozan at 2.3 bpm, 2100 psi. Stack 5K down liner. Ball off reel at 52 bbls. Slow pump to 0.6 bpm, 820 psi at 54 bbls, coil capacity = 59.6 bbls. Ball on seat at 55.6 bbl. Running tool sheared at 2600 psi. Pick up free with 9.5K up wt, a loss of 4.5K up wt. Stack 6K down wt again at 2025.6'. 13:15 - 14:15 1.00 CASE P RUNPRD Circ. 2# Biozan at 2.5 bpm while batch mixing 10.0 PPG False Cement pill, Circ 40 bbls at 2.5 bpm, 2130 psi, Stage 25.5 bbl False cement pill, 2.5 bpm, 2160-2280 psi. Stage 20 bbl rig water, 2.4 bpm, 2300 psi. Zero in and out totalizers on lead of rig water. Stage 2# Biozan, 2.2 bpm, 2000 psi. 40 bbl total displacement, 2.2 bpm, 1770 psi, full returns. 57 bbl displacement, 2.2 bpm, 1950 psi.. Stop pump. Let equalize, Open Baker choke. Pick up 24' to 2000'. 9.5K up wt, clean pick up all 3 times. Circ. 5 bbl to fully displace false cement from coil, 2.5 bpm, 2000 psi. 14:15 - 14:25 0.17 CASE P RUNPRD RIH to 2025.6' at 6K down wt. Pump 0.2 bpm„ press climbed to 2100 psi and LWP sheared. Displace LWP to landing collar. Liner capacity to landing collar = 5.5 bbls. LWP landed at 5.9 bbls. Press up 1000 psi over. Hold 2800 psi. Holding steady press. Press up to 450 psi. Sting out at 9K up wt. Circ. at 2.7 bpm, 2020 psi. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 3 of 16 Operations Summary Report ', Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date ~,~ From - To Hours Task Code NPT Phase Description of Operations 2/18/2008 14:15 - 14:25 0.17 CASE P RUNPRD BTT SELRT test is complete. All BTT tools worked correctly. Liner released OK, lost 4.5K up wt. Cement displaced OK, 25 bbl, high vis at 10.0 PPG. Sting out clean. 9.5K up wt. Overdisplaced excess cement from coil. Sting back in clean, RIH to original depth with 6K stacked. Press up to 2100 psi at 0.2 BPM. LWP sheared at 0.5 bbl. Displaced LWP with 5.4 bbls more and bumped LWP on landing collar at 5.9 bbls. Held 1000 psi over, OK. Bled down to 500 psi and stung out clean with 9K up wt. 14:25 - 14:50 0.42 CASE P 14:50 - 15:00 0.17 CASE P 15:00 - 15:20 0.33 CASE P 15:20 - 16:00 0.67 CASE P 16:00 - 16:20 0.33 CASE P 16:20 - 16:30 0.17 CASE P 16:30 - 19:00 2.50 CASE P 19:00 - 20:15 1.25 DRILL ~ P 20:15 - 20:30 0.25 DRILL P 20:30 - 20:45 0.25 DRILL P 20:45 - 21:30 I 0.751 DRILL I P 21:30 - 21:50 0.33 DRILL P 21:50 - 22:15 0.42 DRILL P 22:15 - 22:30 0.25 DRILL P 22:30 - 00:00 1.50 DRILL P 2/19/2008 100:00 - 00:40 I 0.671 DRILL I P RUNPRD OH with CELRT. Circ at 2.7 bpm, 1900 psi. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for laying out BTT liner running tools and M/U BTT Fishing tools. RUNPRD Recover BTT SELRT BHA. BTT will inspect SELRT. M/U BTT Hyd GS Spear fishing BHA #3. BHA OAL = 5.92'. RUNPRD RIH with BTT H d S S Up wt at 1900' = 8K. RIH and set down on fish at 2 Up wt = 13.5K. We have fish. RUNPRD POH with fish. Fill 4-1/2" tubing across the top. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for laying BTT Fishing tools and liner. RUNPRD Lay out BTT Hyd GS Spear. Lay out 3-1/2" pup jts, 17 jts of 3-3/16", TCII tubing and 10 jts of 2-7/8", STL Tubing with Float equipment. Wet string. Rig water inside tubing. LWP in bottom of tubing with no way to drain tubing. Recover all of test liner and a ui ment. PROD1 Fill hole. Clear rig floor of liner running equipment and pup joints. Clean up mess from pulling wet string, mix up inhibitor pill for purging reel. NORDIC CREW CHANGE. PROD1 MU CT riser to well, prepare to pump fresh water ahead of purging reel. PROD1 SAFETY MEETING. Discuss procedure, hazards and mitigations for pumping inhibited water and purging reel with N2. PROD1 Pump 50 bbls fresh water through coil, followed by 10 bbls inhibited water then 10 bbls McOH. PROD1 Purge reel with N2 at 1,500 scfm. PRODi N2 at tool end of CT, stop pumping and bleed off. PROD1 SAFETY MEETING. Discuss procedures, hazards and mitigations for unstabbing pipe and pulling it back to reel. PROD1 Break off well. Run pipe down and cut off CT connector. Install internal grapple and pull test. Start pulling CT back to reel. Attach CT clamp and secure pipe end to drum. Prepare to lower reel onto truck. PROD1 Lower reel onto truck, secure it at the spokes. Printed: 3/12/2008 11:47:23 AM BP EXPLOR,4TION Operations Summary Report Page 4 of 16 ~ Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/19/2008 00:00 - 00:40 0.67 DRILL P PROD1 Spot second trailer into position, hook up slings to reel. Lift reel into reel house. 00:40 - 02:00 1.33 DRILL P PROD1 Close bay doors in reel house. Stab center pins into reel hub. Attach collector. Hook up hardline inside drum. 02:00 - 02:20 0.33 DRILL P PROD1 SAFETY MEETING. Discuss procedure, hazards and mitigations for pulling CT across pipe shed roof into injector. 02:20 - 02:30 0.17 DRILL P PROD1 Pull CT across and stab pipe. 02:30 - 03:40 1.17 DRILL P PROD1 Install boot to protect cable from fluid invasion. MU riser to wellhead and pump forward slowly 2 bbls McOH. Close inner reel valve and PT reel 1502 line to 4,000 psi, good. Pump McOH ahead then fill reel forward slowly. 03:40 - 03:50 0.17 DRILL P PROD1 Break off the well, make sure cable is all the way inside the CT for pumping slack backwards. Cut off 8 ft of cable and re-install cable boot. 03:50 - 04:10 0.33 DRILL P PROD1 Pump backwards 3.4 bpm to shift cable back. 04:10 - 04:20 0.17 DRILL P PROD1 Break off well. Cut 50 ft of CT back to find cable. 04:20 - 06:00 1.67 DRILL P PROD1 Strip cable back to perform insulation and continuity test, good test. Install CT connector and pull test to 35 Klbs, good. Install cable head. 06:00 - 06:30 0.50 DRILL P PROD1 PT cable head to 4,000 psi, good. Bleed off pressure. 06:30 - 06:45 0.25 DRILL P PROD1 SAFETY MEETING. Discuss procedure, hazards and mitigations for M/U Coiltrak build drilling BHA. 06:45 - 07:40 0.92 DRILL P PROD1 M/U CoilTrak Build BHA #4 with HYC BC Bit #1, 2.0 deg Extreme motor and CoilTrak tools. BHA OAL = 66.05'. Circ. 66 bbls at surface at 2.6 bpm, 2150 psi, for slack management. 07:40 - 10:00 2.33 DRILL P PROD1 RIH with CoilTrak Build BHA #4. Check Coiltrak tools at surface. OK. RIH. Circ at 0.2 bpm. Start Fluid swap to FloPro. RIH to 9175'. 10:00 - 11:00 1.00 DRILL P PRODi Log GRTie-in with original well from 9175'. 2 fpm. Added 13 ft to CTD, Log to bottom. Tagged bottom on depth at 9260'. So window ~ top and bottom are correct. 11:00 - 14:15 3.25 DRILL P PROD1 Drill bull sec ion in u lik, 2.4 bpm, 3200-3900 psi, 30R TF, 10 fph, 10.2 ECD, full returns. 14:15 - 18:30 4.25 DRILL P PROD1 Drill build section in Shublik, 2.5/2.5 bpm, 3480-3900 psi, 150R TF, 13 fph, WOB 1.1 K, 10.2 ECD, 18:30 - 18:40 0.17 DRILL P PROD1 Motor stall at 9,396 ft. Up weight here is 38 Klbs. Resume drilling 2.5/2.5 bpm, 3,200 psi off bottom. Drill to 9,400 ft. 18:40 - 18:55 0.25 DRILL P PRODi Wiper trip from 9,400 ft to 9,260 ft. Up weight is 36 Klbs, clean pickup. 18:55 - 00:00 5.08 DRILL P PROD1 Drill from 9,400 ft. Multiple stalls from 9,407 ft onwards. Slow ROP to 15 - 25 ft/hr. NOTE: Estimated top Zone 3 C~ 9,425 ft +/- Slight mud losses from 9,430 ft onwards. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 5 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date Ii From - To Hours Task Code NPT Phase Description of Operations 2/19/2008 18:55 - 00:00 5.08 DRILL P PROD1 Continue drilling build section at 2.4 bpm to 9,468 ft. 2/20/2008 00:00 - 01:30 1.50 DRILL P PROD1 Continue drilling from 9,468 ft to 9,490 ft. 01:30 - 03:10 1.67 DRILL N DPRB PROD1 Drill past 9,490 ft and lose returns. Pull u and off bottom at drillin rate, near 100% losses. Call out another batch of re-conditioned mud. Pull into casing and pump minimum rate until additional mud arrives. 03:10 - 03:20 0.17 DRILL N DPRB PROD1 176 bbls additional mud arrives, RIH back to bottom. 03:20 - 03:50 0.50 DRILL P PROD1 Drill from 9,491 ft. Initial rates 2.4 / 0.9 bpm. Drill to 9,495 ft, lose returns continue drilling at 2.5 / 0.01 bpm. Stall at 9,511 ft, up weight is 40 Klbs clean pickup. 03:50 - 04:40 0.83 DRILL P PRODi At 9,515 ft some returns, drill at 2.5 / 0.15 bpm. 9,530 ft up weight is 39 Klbs, clean pickup. Drill ahead at 2.5 / 0.7 bpm to 9,546 ft. 04:40 - 05:20 0.67 DRILL P PROD1 Losses slowl healin ,drill ahead from 9,546 ft at 2.5 / 1.0 bpm. Stall at 9,550 ft, clean pickup. 05:20 - 06:20 1.00 DRILL N DPRB PROD1 Pit volume down to 100 bbl, pick up into csg and circ at minimum rate until new mud show up. 06:20 - 07:15 0.92 DRILL P PROD1 RIH tag at 9556'. Drill to 9557 Total losses again. Drill 2.29 ~m returns gradually increase to .8 bpm .Drill to 9564. lost MWD signal. 07:15 - 07:30 0.25 DRILL N DPRB PROD1 Circulate 1.09/.08 bpm 07:30 - 11:40 4.17 DRILL P PROD1 Drill 2.35/.5 bpm at 2930psi, 2560 psi FS, 1.7 K W06,28 ROP. ECD 9.66. Drill to 9570 lost returns. Continue to drill with 2 bpm losses. 2.33 bpm/.3 C~ 2556 psi, WOB1.2K, ROP 1-5. Drill to 9578.High chert content. Wil be waiting on fluids. Decide to pull bit. 11;40 - 13:30 1.83 DRILL P PROD1 POH to window .56/.08 bpm. Line up to circulate across the top x.68/.60 bpm. Continue to POH with correct hole fill. 13:30 - 14:30 1.00 DRILL P PROD1 Swap out bit rung out grade 7-1. PU new Smith BiCenter. 14:30 - 16:30 2.00 DRILL P PROD1 RIH to tie-in. 9245' 16:30 - 16:40 0.17 DRILL P PROD1 Log tie-in =10 correction 16:40 - 18:20 1.67 DRILL P PROD1 RIH to TD. Drill 2.69/1.06 BPM. 2940 psi, WOB .8 K, ROP 25,ECD 9.53 18:20 - 20:10 1.83 DRILL P PROD1 Stall at 9,622 ft. Up weight is 38 Klbs clean pick up. Resume drilling 2.5 / 1.2 bpm. ROP around 40 - 50 ft/hr, ECD = 9.50. 07:00 -Stall at 9,638 ft. Up weight is 38 Klbs, clean pick up. Reduce pump rate slightly due to vibration. Resume drilling at 2.2 / 0.9 bpm. ROP around 30 - 40 ft/hr, ECD = 9.45. Drill to 9,659 ft. 20:10 - 20:40 0.50 DRILL P PROD1 Pick up hole to orient highside. Orienter is fighting end-stops to get to highside. 20:40 - 22:30 1.83 DRILL P PROD1 Drill from 9,659 ft at 2.55 / 1.0 bpm. Initial ROP is 70 ft/hr, WOB = 1 Klbs, ECD = 9.46. 21:15 -Drill past 9,690 ft at ROP = 60 - 70 ft/hr. Rate is 2.5 / 1.2 bpm, ECD = 9.47. 21:30 -Return rate drops drilling past 9,700 ft, now 2.6 / 0.9 bpm with ROP = 60 - 70 ft/hr. Returns not getting better than around 1.1 bpm, start mixing Forma-Squeeze pill. Drill to 9,750 ft. Pump 2.6 / 0.9 bpm. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 6 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 2/20/2008 22:30 - 22:50 0.33 DRILL P PROD1 Wiper trip from 9,750 ft. Pump is 2.6 / 1.0 bpm off bottom, clean pickup. 22:50 - 23:20 0.50 DRILL N DPRB PROD1 Pull into csg and circ at min rate required to keep hole full while LCM ill is bein mixed. 23:20 - 23:40 0.33 DRILL N DPRB PRODi SAFETY MEETING. Discuss procedure, hazards and mitigations for pumping Forma-Squeeze pill. 23:40 - 00:00 0.33 DRILL N DPRB PROD1 Start LCM pill down CT. Zero in MM when it reaches coil. 2/21/2008 100:00 - 01:00 I 1.001 DRILL I N I DPRB I PROD1 01:00 - 01:35 I 0.581 DRILL I N I DPRB I PROD1 01:35 - 02:00 0.42 DRILL N DPRB PROD1 02:00 - 02:20 0.33 DRILL N DPRB PRODi 02:20 - 02:35 0.25 DRILL N DPRB PRODi 02:35 - 03:25 0.83 DRILL N DPRB PRODi 03:25 - 03:55 I 0.501 DRILL I N I DPRB I PROD1 26 bbls in switch to Viscosified Flo-Pro and chase Forma-Squeeze to bit. 46.2 bbls in switch to regular Flo-Pro. 57.5 bbls in zero out MM. (Coil volume) 60 bbls in start POOH at 0.6 bpm, 60 - 65 ft/min. Returns 0.02 - 0.05 bpm while laying in pill. Shut down pump to pull through window. Inside casing continue POOH at 60 - 65 ft/min, pump 0.6 bpm. Returns 0.06 bpm. Pull up hole, continue laying in LCM pill 1:1. After pill is out continue POOH to safe depth. Pump an additional 10 bbls mud through BHA to clean it. Stop at 7,050 ft and shut in well. Zero in MM. Pump down CT and apply squeeze pressure. Pump 4.5 bbls to get 103 psi W P. 7 bbl / 140 psi 10 bbl / 168 psi, pressure stops climbing -Shut down injection for 10 min, allow water to squeeze out of pill. Pressure breaks back to 130 psi, resume injection at slow rate. 11 bbl / 128 psi 14 bbl / 140 psi 16bb1/165psi 18bb1/183psi 20 bbl / 205 psi Stop injection at 20.1 bbls squeezed away, 205 psi WHP. After 20 min pressure breaks back to 88 psi, pump it up again with remaining Forma-Squeeze. At 25 bbls away WHP is 157 psi. WHP is 165 psi, wait on squeeze pill. After 15 minutes pressure starts to break down, at 140 psi. Bleed off remaining pressure, pump minimum rate at 7,100 ft. 0.35 / 0.15 bpm. RIH to check losses at drilling rate. At 9,400 ft circ at 2.46 / 1.4 bpm initial rate Returns slowly improving to 0.8 bpm loss at drilling rate, RIH to bottom. Slow pump to 1.5 bpm when going past fault zone. At 9,678 ft stack weight and take motor work. Pick up and orient toolface. RIH again, tag at 9,688 ft. Pick up is 40 Klbs, clean. RIH at speed with pumps off to try and pass, no luck. RIH again slowly with 2.3 bpm pump, pass cleanly then tag 9,692 ft. Work down to bottom at 2.4 / 1.8 bpm. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Operations Summary Report Page 7 of 16 Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/21/2008 03:55 - 05:25 1.50 DRILL P PROD1 05:25 - 06:00 I 0.581 DRILL 1 P I I PROD1 06:00 - 06:30 I 0.501 DRILL I P i (PROD1 06:30 - 12:00 I 5.501 DRILL I P I I PROD1 12:00 - 14:40 I 2.671 DRILL I P I I PRODi 14:40 - 15:45 I 1.081 DRILL I I I PRODi 15:45 - 17:20 1.58 DRILL P PROD1 17:20 - 17:40 0.33 DRILL P PROD1 17:40 - 18:40 1.00 DRILL N DPRB PRODi 18:40 - 20:00 1.33 DRILL N DPRB PRODi 20:00 - 20:30 0.501 DRILL N I DPRB PROD1 20:30 - 20:50 I 0.331 DRILL I N I DPRB I PROD1 20:50 - 22:15 I 1.421 DRILL I N I DPRB I PROD1 Find bottom at 9,747 ft. Drill at 2.5 / 2.0 bpm with initial ROP = 40 ft/hr. WOB = 1.2 Klbs, ECD = 9.81. Drill past 9,782 ft losses increase. Returns fall to 1.5 bpm slowly return to 1.8 bpm. 2.54 / 1.76 bpm at 40 - 50 ft/hr ROP. ECD = 9.69, WOB = 2.2 Klbs. At 9,800 ft returns fall again, now 2.55 / 1.38 bpm. Pick up to re-calculate landing point, based on new correlation. Drill 2.58 / .78 bpm at 30-40ft/hr ROP. ECD = 9.63, WOB = 0.9-1.15 Klbs. Drill to 9900'. POH to 9500' Lay in 27 bbl; LCM pill 1:1 to 8800 ~ 2.0/.97 bpm 65fpm and pull to 8400. 10 bbl of pill available Bullhead 5 bbl with no WHP. Continue to POH circulating across the top with correct hole fill. LD BHA #5 and PU later assy with Weatherford motor and resitvity. RIH 9250 Log tie-in + 10 correction. RIH 2.4/1.6 bpm at 3000 psi FS. 06:10 -Start forma-squeeze pill down CT. Zero in MM when it reaches coil. At 59 bbls in start POOH from 9,800 ft at 1 bpm / 60 ft/min. 62 bbls in reduce rate to 0.6 bpm, continue POOH at 60 Wmin. Reduce pump to 0.2 bpm to pull through window. 69.3 bbls in, stop at 8,950 ft and shut in well. Squeeze LCM pill away at 0.5 bpm. 80 bbls in (10.7 squeezed away) / 7 psi WHP 85 bbls in / 73 psi. 90 bbls / 187 psi WHP / 420 psi circ pressure / 3,938 psi annular. 94.6 bbls / 179 psi WHP / 3,950 psi annular. Total LCM pumped is 94.6 bpm. Pick up CT for weight check and WHP increases abruptly, may be packing off around BHA. Switch to flo-pro and pump 5 bbls down backside to clear BHA at 1 bpm / 640 psi pump pressure / 3,986 psi annular. Switch to hi-vis flo-pro down the CT. CT pressures up to 2,000 psi, packed off downhole inside BHA or CT. Dump pressure with Baker choke and pressure up again 4 times, no luck. Prepare to open circ sub to establish circulation. Pressure up annulus to equalize in/out BHA pressure so EDC can be opened. Send signal to open circ sub, circ sub shows 99% open. Line up to pump down CT, CT is still plugged off. Pressure up several times and dump it with the Baker choke, not able to establish circulation. Check all screens and filters in the reel house. Double check flow paths on surface. Flow paths OK. POOH, fill well across the top. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 8 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/21/2008 22:15 - 22:35 0.33 DRILL N DPRB PROD1 SAFETY MEETING. PJSM to discuss procedures, hazards, 22:35 - 23:00 I 0.421 DRILL I N I DPRB I PRODi 23:00 - 23:45 I 0.751 DRILL I N I DPRB I PROD1 23:45 - 00:00 I 0.251 DRILL I N I DPRB I PROD1 2/22/2008 00:00 - 00:45 0.75 DRILL N DPRB PROD1 00:45 - 01:00 0.25 DRILL N DPRB PROD1 01:00 - 01:20 0.33 DRILL N DPRB PRODi 01:20 - 03:00 1.67 DRILL N DPRB PROD1 03:00 - 03:40 0.67 DRILL N DPRB PROD1 03:40 - 04:00 I 0.331 DRILL I N I DPRB I PROD1 04:00 - 05:30 1.50 DRILL N DPRB PROD1 05:30 - 06:15 0.75 DRILL N DPRB PROD1 06:15 - 07:45 1.50 DRILL N PROD1 07:45 - 08:15 0.50 DRILL N PROD1 08:15 - 08:30 0.25 DRILL N PROD1 08:30 - 08:45 0.25 DRILL N PRODi 08:45 - 08:55 0.17 DRILL N PROD1 08:55 - 09:45 0.83 DRILL N PRODi and mitigations for pulling BHA. Discuss potential trapped pressure and mitigations. Tag stripper, break apart BHA. slight pressure at connection, 100 - 200 psi. Stand back entire BHA #6 in derrick. Forma-Squeeze found on outside of BHA. MU CT riser to well, attempt to circulate the coil. CT pressures up to 1,000 psi, no circulation. Pressure up to 2,000 psi then 3,500 psi several times and bleed off with Baker choke, no circulation. Call out CT hot tap from Deadhorse. Fill hole prior to next step. SAFETY MEETING. Discuss procedure, hazards and mitigations for hot tapping CT. Hot tao CT iust above CT connector, no pressure seen. Cut off CT connector. MU to well and attempt to circulate. Close swab and line up to pump down the CT. Pump down CT, pressure up to 1,500 psi no circulation. Rig up CT hydraulic cutter. Cut 90 ft, CT pieces are packed off with hydrated forma-set. After 90 ft some fluid is seen. Get over well and circulate. Circulate a coil volume until returns are clean. NOTE: Total of 37.2 bbls LCM pill pumped downhole, 57.4 bbls out to cuttings box. Pull off well, drop hydraulic cutter off of CT riser. Fill hole. Pull injector over to circ hole. Lay down BHA #6. Bit and motor packed off with LCM. Install CT connector. Pull test to 36 Klbs. MU new BHA on catwalk. Install cable head, pressure and electrical test is good. MU BHA #7 - 1.25 deg AKO Weatherford motor + res tool. RIH to 8000'.loss rate .25 bpm. Attempt to pressure pill 1.4 bpm WHP gradually increases to 340 psi took 25 bbls. ECD 10.0 BBIs WHP 5 180 9.5 230 12.7 264 14 275 15 282 16 290 17 298 20 330 24 337 25 340 Shut in well pressure bleed off from 330 to 176 psi in 10 min. RIH to 9250' Log tie-in. correction +10'. RIH at min rate to 9630. set down .Increase rate to 2.45/1.5 continue to RIH.Wash from 9620 to 9904 2.57/1.79 bpm Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 9 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To ~ Hours I Task Code NPT Phase Description of Operations 2/22/2008 08:55 - 09:45 0.83 DRILL N PROD1 3200 psi. ECD 9.79. 09:45 - 12:24 2.65 DRILL P PROD1 Drill 2.57/1.68 bpm 3440 psi , 3200 psi FS, TF 90 R, ROP 50, WOB 1.5K ECD 9.75. WOB FS Drilling ROP 1.8 3000 3500 1.4ft/min 1.35 3000 3200 .5 1.69 3000 3252 .6 1.95 3000 3318 .8 1.75 3000 3360 1.0 1.97 3000 3439 1.2 1.98 3000 3636 1.6 1200 psi drill off 2.82 3000 3700 1.5 Drill to 10009 Lost returns. Loss rate increased to 1.8 bpm 12:24 - 13:10 0.77 DRILL P PROD1 Start swapping to 2% KCL while drilling ahead. Drill ahead to 10050. 13:10 - 14:00 0.83 DRILL P PROD1 Wiper to window. 8.36 ppg in wt ,8.58 ppg outwt. 2.43/1.5 bpm 1805 psi. FS, Clean trip. 14:00 - 15:00 1.00 DRILL P PRODi Drill 2.64/2.02 bpm @ 2604 psi, 2300psi FS, TF 75L,WOB.8K ROP 72,ECD 8.9, Attempted 1800psi differential pressure wouldn't drill off. (Weatherford spec claim max 2000 psi). Drill to 10200 15:00 - 16:30 1.50 DRILL P PRODi Drill 2.62/1.86 bpm @ 2630 psi, 2200 psi FS, TF 110L, WOB 3.5K, ROP 90, ECD 9.23. (1700 psi drill off at 10139'.) (1800 psi stall @ 10140') (1600 psi drill off 10177) 16:30 - 18:15 1.75 DRILL P PROD1 Wiper to window. Mad pass to 9900. Continue wiper to 10200 18:15 - 19:10 0.92 DRILL P PROD1 Drill from 10,200 ft at 2.7 / 2.06 bpm, 1,900 psi off bottom. Initial ROP = 120 ft/hr, WOB = 1.3 Klbs. At 10,210 ft pick up, up weight is 48 Klbs 8 Kibs overputl. Difficult sliding, start adding Safe-Cube to system. (1,000 psi drill-off at 10,227 ft) 10,271 ft losing motor work, pickup is 54 Klbs. 19:10 - 19:15 0.08 DRILL P PROD1 Wiper trip from 10,274 ft to 10,170 ft. 19:15 - 20:20 1.08 DRILL P PROD1 Drill from 10,274 ft. (1,000 psi drill-off on bottom) ROP = 100 ft/hr, WOB = 2 Klbs, ECD = 8.91 ppg 10,307 ft - 1,500 psi sustained motor work (2 min) then drill off. 10,314 ft -Lose motor work, pick up is 50 Klbs. Pull 100' wiper. Drill from 10,314 ft at 2.4 / 1.75 bpm. ROP = 90 - 100 ft/hr, WOB = 1.75 Klbs, ECD = 8.94 ppg. Drill to 10,340 ft, stacking weight. 20:20 - 21:00 0.67 DRILL P PROD1 Wiper trip from 10,340 ft to 9,260 ft. Clean pass up and down. Drop pump to 1.8 bpm across loss zone, 9,490 - 9,700 ft. Drop pump rate and pull through window to tie-in depth. 21:00 - 21:15 0.25 DRILL P PROD1 Log to tie-in depth from 9,240 ft downwards at 120 ft/hr. Correction is +6 ft. Run back to bottom. 21:15 - 21:40 0.42 DRILL P PRODi Continue wiper trip back to bottom. 21:40 - 22:45 1.08 DRILL P PROD1 Drill from 10,340 ft. 2.5 / 1.8 bpm, WOB = 3.2 Klbs, Initial ROP = 100 ft/hr, ECD = 9.01. Stacking weight at 10,372 ft, pickup is 50 Klbs. Printed: 3/72/2008 11:47:23 AM BP EXPLORATION Page 10 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT 2/22/2008 21:40 - 22:45 1.08 DRILL P 22:45 - 00:00 1.25 DRILL P 2/23/2008 00:00 - 00:20 0.33 DRILL P 00:20 - 00:30 0.17 DRILL N DPRB 00:30 - 00:40 0.17 DRILL P 00:40 - 01:45 1.08 DRILL P 01:45 - 02:40 0.92 DRILL P 02:40 - 03:15 0.58 DRILL P 03:15 - 03:25 0.17 DRILL P 03:25 - 04:05 0.67 DRILL P 04:05 - 05:10 1.08 DRILL P 05:10 - 06:00 0.83 DRILL P 06:00 - 06:20 0.33 DRILL P Spud Date: 9/9/1995 Start: 2/16/2008 End: Rig Release: 2/28/2008 Rig Number: Phase Description of Operations PROD1 Continue drilling past 10,375 ft at 2.52 / 1.79 bpm, WOB = 3.3 Klbs, ROP = 70 fUhr, ECD = 8.98. 10,401 ft - 1,100 psi drill-off. PROD1 Stacking weight occasionally. Pump 14 bbls pill of hi-vis. Pull 100 ft wiper from 10,406 - 10,300 ft. Better weight transfer seen after hi-vis pill comes around. 10,438 ft - 1,600 psi sustained (2.5 min) motor work then drill off. 10,462 ft - 1,400 psi sustained motor work (2 min) and drill off. PRODi Drill from 10,460 ft to 10,480 ft. Pump a 13 bbl sweep around. PROD1 Drill to 10,481 ft. T to ick u and CT is differential) stuck on bottom. Shut down pump. Work pipe several times, up to 70 Klbs. Work orienter, turning freely. Stack weight down and turn pumps back on, CT is free. PROD1 Continue drilling until hi-vis pill is out the bit. 2.57 / 1.75 bpm, ECD = 9.04 PROD1 Wiper trip from 10,484 ft back to window. Clean pass up and down. Reduce pump to 2 bpm through loss zone. PRODi Drill from 10,482 ft at 2.50 / 1.70 bpm, initial ROP = 112 ft/hr, ECD = 8.90, WOB = 2.94. 10,506 ft - 1,800 psi stall. Up weight is 42 Klbs, clean pick up. 02:15 -Pump 10 bbl hi-vis sweep. 10,515 ft - 1,800 psi stall. Pick up is 43 Klbs, clean pick up. Continue drilling 2.54 / 1.63 bpm, 2,000 psi off bottom. ECD = 8.85, WOB = 3.25 Klbs. Stacking weight at 10,532 ft, up weight is 60 Klbs, 15 Klbs overpull. PROD1 Drill from 10,532 ft at 2.56 / 1.71 bpm, WOB = 3.25 Klbs, ECD = 8.93. Stall at 10,551 ft, up weight is 44 Klbs. Drill to 10,564 ft at 2.66 / 1.82 bpm. ECD = 8.99 Stack weight and pickup, 44 Klbs clean pickup. PROD1 Drill to 10,575 ft and stack weight. Up weight is 50 Klbs. Pull a short wiper from 10,575 ft back to 10,500 ft. Diffi Pump 10 bbl hi-vis pill around. PROD1 Drill from 10,575 ft at 2.6 / 1.7 bpm, ECD = 9.01, WOB = 3.2 Klbs, ROP = 80 - 120 ft/hr. 10,587 ft - 1,400 psi drill-off after 1.5 min. 10,600 ft - 1,100 psi drill off after 3 min. Drill to 10,624 ft. PROD1 Wiper trip from 10,624 ft to 9,260 ft. Up weight is 43 - 45 Klbs. 2.6 / 1.6 bpm during wiper. PROD1 Drill from 10,624 ft. 2.6 / 1.6 bpm, ECD = 8.91, ROP around 120 fUhr. Stacking weight at 10,645 ft pickup is 45 Klbs. Stacking weight at 10,659 ft, pickup is 65 Klbs. Pump 10 bbls hi-vis pill. PROD1 Wiper trip from 10,687 ft to 10,590 ft. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 11 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date ~ From - To Hours Task ~ Code NPT Phase Description of Operations I 2/23/2008 06:20 - 07:45 1.42 DRILL P PROD1 Directionally drill 2.65./ 1.8 bpm @ 3300psi, 2000 psi FS ,TF 90R, WOB 2.8K,ECD 8.98. Drill to 10750 07:45 - 08:30 0.75 DRILL P PROD1 Wiper trip to window. 08:30 - 08:37 0.12 DRILL P PROD1 Log tie-in. Correction = +10' correction. 08:37 - 09:15 0.63 DRILL P PROD1 Wiper to TD. 09:15 - 11:15 2.00 DRILL P PROD1 Directionally drill 2.72./ 1.8 bpm@ 2500psi, 2000 psi FS ,TF 90R, WOB 3.8K,ECD 8.98. Trouble drill with stacking out. Appears the coil adjacent to fault getting differentially stuck once drilled off unable to slide. 30K overpulls on PU. 11:15 - 13:00 1.75 DRILL P PROD1 Wiper to window. Up wt erratic until above fault.Trip in hole no problem 2.6 / 1.8 bpm @ 1930 psi. DN WT 19K 13:00 - 13:50 0.83 DRILL P PROD1 Directionally drill 2.54/1.75 bpm at 3000-2200psi. 1950 psi FS, Continue to have stacking .Drill to 10938'. 13:50 - 14:30 0.67 DRILL N PROD1 Pick up off bottom 10440 replace bearings in injector. 14:30 - 15:40 1.17 DRILL P PROD1 Directionally drill 2.66/1.72 bpm @ 3200psi , 2000psi FS, Stacking Drill to 10990' 15:40 - 18:00 2.33 DRILL P PROD1 Wiper to window. 18:00 - 18:40 0.67 DRILL P PROD1 Drill from 10,990 ft to 11,011 ft. Stacking weight and 20 - 25 Klbs overpull off bottom. 2.5 / 1.7 bpm, ECD = 8.96, WOB = 3.5 Klbs. 18:40 - 19:10 0.50 DRILL P PROD1 Flo-Pro mud arrives on location. Pull a wiper while hooking it up. 19:10 - 20:00 0.83 DRILL P PROD1 Start flo-pro down the coil. ECD = 8.98 when flo-pro reaches bit. After 40 bbls out the bit, ECD = 9.25, 2.65 / 1.98 bpm. 20:00 - 20:50 0.83 DRILL P PROD1 Weight just prior to drilling is 42 Klbs. Drill from 11,007 ft. Set down weight at 11,007 ft and try to drill ahead, slow progress. 2.55 / 1.38 bpm, WOB = 4 Klbs, ECD = 9.50, 1100 psi motor work, ROP = 18 fUhr. 11,010 ft - 2.54 / 1.25 bpm, WOB = 5.2 Klbs, ECD = 9.60, ROP = 0, 1,100 psi motor work. Clean pickups, up weight is 40 Klbs. Try drilling with less WOB, ROP increases to 72 fUhr after 11,015 ft. 11,024 ft -Drill at 2.56 / 1.2 bpm, ECD = 9.67, WOB = 4.06 Klbs, ROP = 32 ft/hr. 20:50 - 21:00 0.17 DRILL P PROD1 ROP slows at 11,024 ft. Pick up to get weight back, up weight is 41 Klbs. Resume drilling at 70 - 80 ft/hr past 11,030 ft 2.57 / 1.18 bpm. 21:00 - 21:30 0.50 DRILL P PROD1 Run out of flo-pro, switch back to KCI water. Total of 34 ft drilled in 1 hr with flo-pro. 11,045 ft -ECD = 9.71, 2.39 / 0.98 bpm, ROP = 60 - 70 Whr as last flo-pro reaches bit. 21:30 - 22:55 1.42 DRILL P PROD1 On KCI water now, drill past 11,045 ft at 2.4 / 0.85 bpm, ECD = 9.55, Initial ROP = 30 ft/hr. Stacking weight repeatedly at 11,049 ft, pickup weights increasing to 55 Klbs off bottom. Pump a 23 bbl flo-pro pill around. Drill past 11,060 ft at 2.52 / 1.68 bpm, ECD = 9.13, ROP = 10 - 30 fUhr, WOB = 4.21. 22:55 - 23:50 0.92 DRILL P PRODi Stacking weight at 11,063 ft. Up weight is 44 Klbs. Printed: 3/12/2008 11:47:23 AM • w BP EXPLORATION Page 12 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To ~ Hours '; Task Code I NPT Phase Description of Operations i 2/23/2008 22:55 - 23:50 0.92 DRILL P PROD1 Work back to bottom, drill past 11,063 ft at 2.44 / 1.71 bpm, ROP = 15 ft/hr, ECD = 9.02. New mud arrives, start it down the CT, continue drilling ahead with water at 10 ft/hr. Last water out the bit at 11,077 ft 2.38 / 1.69 bpm, ECD = 8.86 ft. Total of 32 ft drilled in 2.84 hrs with water. 23:50 - 00:00 0.17 DRILL P PROD1 Drill from 11,077 ft to 11,090 ft. 2/24/2008 00:00 - 00:25 0.42 DRILL P PROD1 Continue drilling from 11,090 ft to 11,100 ft. 00:25 - 01:30 1.08 DRILL P PROD1 Wiper trip from 11,100 ft to 9,700 ft. Clean pass up and down. 01:30 - 03:10 1.67 DRILL P PROD1 Drill from 11,100 ft. Apparent 1,000 psi stall at 11,120 ft, up weight is 40 Klbs clean pickup. Drill ai 11,120 ft at 2.41 / 1.16 bpm, ECD = 9.65, WOB = 2.7 Klbs, ROP = 50 ft/hr Stall at 11,130 ft, up weight is 40 Klbs clean pickup. 11,132 ft - 2.41 / 1.15 bpm, ECD = 9.69, WOB = 2.2 Klbs, ROP = 50 - 60 ft/hr. 11,150 - 1,100 psi stall, up weight is 40 Klbs clean pickup. 03:10 - 03:30 0.33 DRILL P PROD1 Switch back to KCI water. Drill from 11,150 ft with remaining flo-pro in coil. Total of 75 ft drilled in 2.42 hrs with flo-pro. 03:30 - 03:40 0.17 DRILL P PROD1 Pick up to orient. 03:40 - 04:20 0.67 DRILL P PROD1 Drill from 11,165 ft with water. Stacking weight at 11,165 ft, up weight is 45 Klbs. Drill past 11,167 ft at 2.6 / 1.31 bpm, ECD = 9.58, WOB = 2.8, Initial ROP = 100 ft/hr. Stacking weight at 11,175 ft. Up weight is 42 Klbs, clean pickup. Stacking weight at 11,181 ft, up weight is 58 Klbs. 04:20 - 04:25 0.08 DRILL P PROD1 Start flo-pro down the CT. Drill with remaining KCI water in coil. Stacking weight at 11,191 ft, up weight is 70 Klbs. Stacking weight again, up weight is 80 Klbs, CT is stuck. Run back in and stack weight, pops free. 04:25 - 04:40 0.25 DRILL P PROD1 Pull a short wiper. Go back to drilling at 11,192 ft at 2.53 / 1.72 bpm, ECD = 9.05. 04:40 - 04:45 0.08 DRILL P PRODi Flo-pro out the bit, pick up to orient. 04:45 - 05:30 0.75 DRILL P PRODi Drill with flo-pro from 11,195 ft at 2.46 / 1.65 bpm, ECD = 9.01, initial ROP = 90 - 100 ft/hr. Motor rubber on shaker 05:30 - 07:45 2.25 DRILL P PROD1 Wiper trip from 11,250 ft to window. Tie in depth close to window. Correct +22 ft. RIH tag at 11265' 07:45 - 12:00 4.25 DRILL P PROD1 Drill 2.56/1.37 bpm Q 3350 psi, 3000 psi FS, TF 100L,W0B 1.09K, ECD 9.65, Drill to 11328. Continue to drill 2.48/1.64 bpm C~? 4150 psi, 3600 psi FS, ECD 9.4, Possible nozzel plugging. Reduce rate 2.4/1.5 bpm@ 3400psi,3250 psi FS, 11365 300 psi stalls,.Drill to 11375. TD called 12:00 - 13:00 1.00 DRILL P PROD1 POH (500 psi pressures spike motor chunking out) 13:00 - 13:15 0.25 DRILL P PRODi Log tie-in correction +3.5'. 13:15 - 13:45 0.50 DRILL P PROD1 PU above window.Wait on mud. Static loss rate .5 bpm. Circulate across the top. Printed: 3/12/2008 11:47:23 AM 1 i BP EXPLORATION Page 13 of 16 Operations Summary Report Legal Well Name; 1 8-32 Common W ell Name: 1 8-32 Spud Date: 9/9/1995 Event Nam e: REENTE R+COM PLET E Start : 2/16/2008 End: Contractor Name: NORDIC CALIS TA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: D F ~ C d N D i i f O ti ate rom - To Hours Task o e PT Phase escr pt on o pera ons 2/24/2008 13:45 - 15:10 1.42 DRILL P PROD1 RIH to TD at 11376. 15:10 - 18:00 2.83 DRILL P PROD1 POH lay in liner. 18:00 - 18:30 0.50 DRILL P PROD1 LD BHA motor transmission had 1/2 turn slack in it.. 18:30 - 19:00 0.50 BOPSU P RUNPRD Fill hole prior to next operation. Function test BOPs. 19:00 - 20:10 1.17 CASE P RUNPRD Remove BHI cable head, MU nozzle BHA to prepare for reel purge. MU riser to wellhead, fill hole with flo-pro prior to closing swab. 20:10 - 21:00 0.83 CASE P RUNPRD Close swab and circulate 50 bbls fresh water through CT, followed by 10 bbls inhibited water then 10 bbls McOH. SAFETY MEETING. While circulating, hold safety meeting to discuss procedures, hazards and mitigations for purging reel with N2. 21:00 - 21:25 0.42 CASE P RUNPRD Start N2 down the coil. Purge with 1,500 scfm for 15 min. 21:25 - 21:45 0.33 CASE P RUNPRD Shut down N2, allow to bleed off. 21:45 - 22:00 0.25 CASE P RUNPRD SAFETY MEETING. Discuss procedures, hazards and mitigations for unstabbing and pulling coil back to reel house., 22:00 - 23:30 1.50 CASE P RUNPRD Break off CT riser from well. Install night cap and start filling hole with KCI water. Hole takes 12.2 bbls to fill after 1.93 hrs static. Continue to circulate hole full while swapping reels. Remove nozzle and cut off CT connector. Install internal grapple with cable. Unstab from injector and pull CT across pipe shed roof to reel house. 23:30 - 23:45 0.25 CASE P RUNPRD SAFETY MEETING. Discuss procedures, hazards and mitigations with CH2M HILL drivers for lowering reel onto trailer, and picking work string up. 23:45 - 00:00 0.25 CASE P RUNPRD Lower a-line string onto trailer. Reel is set down on one of the reel support cradles, bending it. CH2M HILL driver goes back to shop to get another one. 2/25/2008 00:00 - 00:30 0.50 CASE N WAIT RUNPRD Wait for CH2M HILL driver to bring a new support cradle out to location. 00:30 - 01:20 0.83 CASE P RUNPRD Cradle arrives, finish lowering a-line reel down and secure to trailer. Unhook slings and raise them into reel house. Close bay doors, get trailer with work string spotted. Lower slings down and hook up work string, lift it into reel house. Insert reel stand drive flanges into reel, secure with bolt. 01:20 - 02:30 1.17 CASE P RUNPRD MU 1502 hardline inside reel. Install internal grapple. Pull CT across pipe shed and stab into injector. 02:30 - 03:45 1.25 CASE P RUNPRD Remove internal grapple. Find a suitable spot and cut the CT for installing CTC. Dress the end of the CT. Install CT connector and pull test to 35 Klbs, good. 03:45 - 04:40 0.92 CASE P RUNPRD Install crossovers on CTC to make up to dart catcher. Install HP hose onto end of CT. Pump 5 bbls McOH ahead, then 5 bbls clean KCI followed by flo-pro to fill coil. 04:40 - 05:15 0.58 CASE P RUNPRD Shut down pumping, insert volume dart into reel. Pump dart around reel into catcher, reel volume is 58.8 bbls. Printed: 3/12/2008 11:47:23 AM • BP EXPLORATION Page 14 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase j Description of Operations 2/25/2008 105:15 - 05:45 I 0.50 I CASE I P 05:45 - 05:55 0.17 CASE P 05:55 - 06:30 0.58 CASE P 06:30 - 06:45 0.25 CASE P 06:45 - 11:15 4.50 CASE P 11:15 - 12:30 1.25 CASE P 12:30 - 13:15 0.75 CASE P 13:15 - 13:50 0.58 CASE P 13:50 - 15:45 1.92 CEMT P 15:45 - 18:00 2.25 CEMT P 18:00 - 18:40 0.67 CEMT P 18:40 - 19:00 0.33 CEMT P 19:00 - 19:30 0.50 CEMT P 19:30 - 20:00 0.50 CEMT P 20:00 - 20:50 I 0.831 CEMT I P RUNPRD Line up to PT inner reel valve. PT inner reel valve to 3,500 psi, good. PT reel 1502 line to 4,000 psi, good. Remove dart catcher sub. Pull injector over to circulate and warm up coil. RUNPRD Pressure test CT connector to 4,000 psi, good. RUNPRD Pull CT over to circulate while running liner. Fill hole while circulating coil. RUNPRD PJSM for running liner. RUNPRD MU liner. MU 36 jts 2-7/8. Fill pipe and KO 39 surplus joints. MU 44 jts 3-3/16 and 1 3-1/2 RUNPRD RIH circulate across top to 9230. PU wt 40K. Run in open hole. Circulate CT min rate. PT 147 C~ 9230'. RUNPRD Continue to RIH 20K Dn WT. RIH to 10400 do wt 19K, .8 bpm loss rate. RIH to 11100 Dn Wt 14K. Tag TD at 11376'. RUNPRD Launch ball with 1000 psi. Circulate ball to seat. 2.45!1.37 bpm at 2300 psi. Slow rate to .5/.07 bpm at 45 bbl in. Ball on seat with 49.4bbls (58.8 bbl calculated). Shear at 3750 psi. PU 34K RUNPRD Circulate 1.05/.23 bpm wait on KCL. Swap well to KCL. RUNPRD RU cementers wait on Vac truck with contaminent pill, Circulate 2.73/1.78 Wait on load of KCI water. RUNPRD Vac truck with full load of KCI water arrives, get it hooked up. RUNPRD SAFETY MEETING. Discuss procedure, hazards and mitigations for cementing liner in place. RUNPRD SLB cement crew starts hatching up 15.8 ppg cement. RUNPRD Cement is ready, PT cement line with water to 4,000 psi. Pump 3 bbls fresh water ahead and shut in cement line to PT. Open up cement line and start cmt down coil. Zero in MM when cmt reaches it. Pum 51.8 bbls cmt into CT. RUNPRD After 51.8 bbls shut down cement pumpers. Line up to flush cement line with biozan. Pump biozan out to the cement truck and vac lines. Insert dart and launch with 500 psi, chase with 100 bbl biozan. Leave in MM running. At 75.2 bbls in zero out MM (cmt at shoe). Pumping 2.34 / 0.9 bpm. Cement turns corner, displace at 2.35 / 0.92 bpm. At 80 bbls in ease pump rate up to 2.55 / 1.05 bpm, 710 psi. At 92 bbls in, circ pressure rises to 1,900 psi. Pumping 2.5 / 1.13 bpm. At 105 bbls in, slow to 1.4 bpm to watch for dart to land. Dart lands at 111.0 bbls. Continue ressurin u to 4,000 si to shear liner wiper plug. Resume displacement at 2.4 / 0.6 bpm after shearing out plug. At 125 bbls in slow to 1.0 bpm and watch for plug to land. Plua lands at 127.3 bbl in. Total of 17.9 bbls cement behind pipe. Pressure up to 1,000 psi over an shut down pump, hold pressure for 1 minute. 20:50 - 20:55 0.08 CEMT P RUNPRD Bleed off Baker choke to test floats, floats holding. Pressure up to 400 psi and unsting from liner. Printed: 3/12/2008 11:47:23 AM • BP EXPLORATION Page 15 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours ~ Task Code ~ NPT-Phase Description of Operations 2/25/2008 20:50 - 20:55 0.08 CEMT P RUNPRD Up weight is 31 Klbs, stop and pump 5 bbls biozan at 0.94 / 0.81 bpm 20:55 - 22:45 1.83 CEMT P RUNPRD POOH, replacing coil voidage. 22:45 - 00:00 1.25 CEMT P RUNPRD Tag stripper, lay down liner running equipment. Clear rig floor and pipe shed of liner running tools and X-overs. Release rig blocks from injector and prepare to run CSH. SWS rig up MCNL toot. 2/26/2008 00:00 - 00:20 0.33 EVAL P LOWERi MU memory logging tools /cleanout assembly. 00:20 - 00:40 0.33 EVAL P LOWERI PJSM Discussed the hazards and mitigations for running MCNL and CSH work string. 00:40 - 01:00 0.33 EVAL P LOW ERi Pu BHA and logging tools 01:00 - 02:30 1.50 EVAL P LOW ERi MU 40 stands of 1-1/4" CSH tubing. 02:30 - 04:40 2.17 EVAL P LOW ERi RIH with logging tools.lnterminent stringers 8050 8300. RIH to 10200. set down No Motor work. CTC hanging on up hole stringers. 04:40 - 07:40 3.00 EVAL N CEMT LOWERI POH for cleanout assy. 07:40 - 08:05 0.42 EVAL N CEMT LOWERI Re head. Open circulation sub. 08:05 - 10:15 2.17 EVAL N CEMT LOWERI Stand back 40 stands of CSH and LD BHA. 10:15 - 10:35 0.33 EVAL N CEMT LOWERI PU cleanout BHA 7 Stab onto well. 10:35 - 12:05 1.50 EVAL N CEMT LOW ERi RIH to 7630. 12:05 - 16:30 4.42 EVAL N CEMT LOWERI ill cement from7630' 2.4/2.4 bpm ~ 1250 psi, 1100 psi FS. 2 K WOB. Tag at 8929 un corrected. FULL Returns 16:30 - 17:00 0.50 EVAL N CEMT LOW ERi Circulatel5 bbl sweep. u returns 17:00 - 19:00 2.00 EVAL N CEMT LOW ERi POH 19:00 - 19:30 0.50 EVAL P LOW ER1 Liner la test at 2000 PSI for 30 min. Starting pressure: 1975 psi 15 minutes: 1922 psi 30 minutes: 1920 psi Dropped 50 psi in first 5 min. 5 psi in next 25 min. Good test 19:30 - 19:45 0.25 EVAL N CEMT LOWERI PJSM Discussed the hazards and mitigations for running MCNL and CSH work string. 19:45 - 22:30 2.75 EVAL N CEMT LOWERI PU Logging BHA and 40 Stds. 1-1/4" CSH 22:30 - 00:00 1.50 EVAL N CEMT LOWERI RIH with logging tools 2/27/2008 00:00 - 01:00 1.00 EVAL P LOW ERi Continue logging down at 30 fpm. Tagged at 11326'. 01:00 - 01:30 0.50 EVAL P LOWERi Circulating flo-pro to mill. 01:30 - 02:15 0.75 EVAL P LOWERI Log up at 60 fpm and lay in flo-pro pert pill 02:15 - 03:30 1.25 EVAL P LOW ER1 8800', POOH 03:30 - 06:00 2.50 EVAL P LOWERI Stand back injector, open circulating sub, stand back CSH ' 06:00 - 07:00 1.00 EVAL P LOW ERi LD memory logging tool. 07:00 - 09:00 2.00 PERFO P LOWERI Load gun into pipe shed. 09:00 - 09:15 0.25 PERFO P LOWERI PJSM for picking up guns, 09:15 - 12:00 2.75 PERFO P LOWERI PU 69 2" guns loaded 6 SPF . Perforating intervals: 9870-10110 10160-10310 10360-10470 10560-11330 12:00 - 13:00 1.00 PERFO P LOWERI Mu 17 s ands of 1-1/4" CSH. 13:00 - 15:00 2.00 PERFO P LOWERI RIH to 9200. Up wt 40 K. Continue to RIH. Tag TD and correct to 11335. ' 15:00 - 16:15 1.25 PERFO P LOW ERi Circualte until returns clean up. 16:15 - 16:30 0.25 PERFO P LOWERi Pump 5 bbl pill. Position reel in ball drop position. Launch ball 1/2" with 10 bbl pill.and 1000 psi. Printed: 3/12/2008 11:47:23 AM BP EXPLORATION Page 16 of 16 Operations Summary Report Legal Well Name: 18-32 Common Well Name: 18-32 Spud Date: 9/9/1995 Event Name: REENTER+COMPLETE Start: 2/16/2008 End: Contractor Name: NORDIC CALISTA Rig Release: 2/28/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2008 16:30 - 17:15 0.751 PERFOB~ P 17:15 - 18:00 0.75 PERFO P 18:00 - 18:15 0.25 PERFO P 18:15 - 20:30 2.25 PERFO P 20:30 - 21:15 0.75 PERFO P 21:15 - 21:45 0.50 PERFO P 21:45 - 00:00 2.25 PERFO P 2/28/2008 00:00 - 02:00 2.00 PERFO P 02:00 - 03:30 1.50 PERFO P 03:30 - 07:30 4.00 WHSUR N 07:30 - 10:00 I 2.501 WHSUR I P 10:00 - 13:00 I 3.001 WHSUR I P 13:00 - 14:00 1.00 WHSUR P 14:00 - 16:00 2.00 WHSUR P 16:00 - 18:00 2.00 WHSUR P 18:00 - 23:00 5.00 WHSUR P 23:00 - 00:00 1.00 WHSUR P LOWERI Circulate ball to firing head. Ball on seat with 55.6bb1. Move pipe.6 fpm At 3000 psi. PU 47K. Bottom shot at 11330. LOWERI POH to 8900 LOWERI Flow check. 0.2 bbls in 15 minutes LOWERi POOH LOWERI Set back injector, stand back CSH LOWERi PJAM for laying down pert guns LOWERI Lay down perf guns LOWERI Continue laying down pert guns LOW ER1 Clear floor and load out pert guns RREP POST Injector skate problems. Broken skate. Cut off CTC and pull back coil. Decision to bulled head freeze protection form town POST Pull coil back coil to injector for Blow down. Will postpone injector repair to rig move. POST RU Little Red to bullhead 35 bbl diesel to freeze protect tubing to 2000+'. PJSM. PT line to 2500 psi. Bullhead @ .25 bpm at 1000psi gradually rising to 1960 psi. POST Set BPV. POST PJSM for Inhibiting coil and blowing down coil with N2. Pump 50 bbl fresh H2O. 15 bbl inhibitor and 10 bbl MEOH. Blow down with N2. POST secure coil at reel and lower reel POST RD injector, clean pits, change rams in BOP stack. POST Nipple down BOP stack. NU tree cap. Rig released at midnight Printed: 3/12/2008 11:47:23 AM by BP Alaska ~t~r Baker Hughes INTEQ Survey Report 1NTE Q Company:: BP Amoco Date: 2/25!2008 Time: 09:53:44 Page: 1 Field: Pnulhoe Bay Co~rdinate(NE} Reference: WeN: 18-32, True North SNe: PB DS 18 Verdeal (TVD) Retereace: 59:32 5/31/1996 09:46 54.0 Weli 18-32 Sutton (VS) Reference: Well (O.OON,O.OOE87.07Azi) Wefipat6: 18-32B Survey Cakalatioa Method: Minimum Curvature Db: Oracle Field: Prr~hoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo IMtum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geamagnetie Modei: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213.15 ft Latttnde: 70 17 35.252 N From: Map Easting: 691583.44 ft Longitude: 148 26 55.555 W Posittea Uacertatuty: 0.00 ft North Rekreace: True Ground Level: 0.00 ft Grid Convergence: 1.46 deg Well: 18-32 Slot Naarc: 32 18-32 Well Posittoa: +N/-S 1002.27 ft Northiag: 5960219.60 ft Latitude: 70 17 45.110 N +E/-W 178.86 ft Fasting : 691736.69 ft Loagitade: 148 26 50.341 W Position Uneertatnty: 0.00 ft Wellpath: 18-326 Drilled From: 18-32 500292258502 Tie-oa Depth: 9176.45 ft Carreat Datum: 59:32 5/31 /1996 09:46 Height 54.00 ft Above System Datum: Mean Sea Level Magnetk Data: 2/15/2008 Deeliaattou: 23.49 deg Fteb Strength: 57677 nT Mag Dip Angle: 80.94 deg Vertkai Section: Depth From (TVD) +N/-S +E/-W DireMioa ft ft ft deg 38.00 0.00 0.00 87.07 Survey Program for Definitive Wellpatb Date: 11/6/2007 Validated: Yes Verstoa: 3 Actual From To Survey Tookode Tool Name ft ft 188.00 9176.45 1 : MWD -Standard (188.00-110 MWD MWD -Standard 9240.00 11376.00 MWD (9240.00-11376.00) MWD MWD -Standard 4nootation MD TVD ft ft 9176.45 8189.33 TIP 9240.00 8239.65 KOP 11376.00 8703.91 TD Survey: MWD Start Date: 2/2x2008 Company: Baker Hughes INTEQ Engineer: Toot: MWD;MWD -Standard Tied-to: From: Definitive Path Sorvey MD Iacl Azim TVD Sys TVD N/S E/W MapN MapE; VS DLS ' Teoi ft: deg deg.. ft ft ft ft H ft ft deg/100ft 9176.45 37.62 75.20 8189.33 8135.33 251.03 3471.92 5960559.10 695200.88 3480.21 0.00 MWD 9240.00 37.67 74.71 8239.65 8185.65 261.11 3509.40 5960570.13 695238.09 3518.16 0.48 MWD 9260.76 40.20 76.60 8255.80 8201.80 264.33 3522.04 5960573.68 695250.64 3530.94 13.46 MWD 9290.40 41.61 79.55 8278.20 8224.20 268.34 3541.03 5960578.16 695269.52 3550.11 8.07 MWD 9319.98 36.05 82.84 8301.24 8247.24 271.21 3559.34 5960581.50 695287.75 3568.54 20.04 MWD 9349.48 29.99 86.50 8325.96 8271.96 272.74 3575.33 5960583.44 695303.69 3584.59 21.62 MWD 9381.56 24.50 99.80 8354.50 8300.50 272.09 3589.91 5960583.17 695318.28 3599.12 25.46 MWD 9410.22 19.75 110.97 8381.05 8327.05 269.35 3600.30 5960580.88 695328.74 3609.35 22.07 MWD 9443.30 15.94 130.21 8412.56 8358.56 264.41 3609.00 5960575.97 695337.56 3617.79 21.07 MWD 9470.92 14.73 138.89 8439.20 8385.20 259.31 3614.20 5960571.01 695342.89 3622.73 9.38 MWD 9501.06 14.53 112.87 8468.40 8414.40 254.95 3620.21 5960566.80 695349.01 3828.51 21.64 MWD r by BP Alaska ~ Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 2!25!2008 Time: 09:53`.44 Page: 2 Fkid: Prudhoe Bay Cn-ordinate(NE) Refereuee: Well: 1$-32, True North Site: PB DS 18 Vertkal (1'VD) Reference: 59 :32'5!31!1996 09:46 54.0 Weq: ' 18-32 SeMien (VS) Reterruee: Well (f).OON,6.OpE,87.07Azi) Wellpath: 18-32B Sarvey Gaka~tion Method: Minimum CtxvBture Db: OraGe Survey MD Iacl Azim TVD Sys TVD N/S ft deg deg.. ft $ ft 9530.84 19.83 101.97 8496.85 8442.85 252.45 9559.86 24.97 92.98 8523.67 8469.67 251.11 9591.12 30.00 91.32 8551.40 8497.40 250.59 9623.38 35.00 96.72 8578.60 8524.60 249.32 9655.23 39.88 103.39 8603.89 8549.89 245.88 9683.51 45.69 103.11 8624.64 8570.64 241.48 9712.03 51.93 103.69 8643.41 8589.41 236.51 9745.19 59.71 106.06 8662.03 8608.03 229.44 9777.31 65.96 106.29 8676.69 8622.69 221.49 9808.45 71.53 101.79 8687.98 8633.98 214.47 9838.39 79.07 101.25 8695.57 8641.57 208.69 9867.49 85.67 98.69 8699.43 8645.43 203.71 9899.79 87.79 93.74 8701.27 8647.27 200.22 9935.50 88.10 97.97 8702.56 8648.56 196.58 9965.06 87.21 103.02 8703.77 8649.77 191.20 9995.10 85.94 108.72 8705.56 8651.56 183.01 10026.54 87.76 115.66 8707.29 8653.29 171.16 10056.98 88.71 121.24 8708.23 8654.23 156.67 10087.10 89.66 122.87 8708.66 8654.66 140.69 10118.79 91.17 118.05 8708.43 8654.43 124.63 10147.95 91.17 113.02 8707.83 8653.83 112.06 10176.33 90.89 108.84 8707.32 8653.32 101.93 10206.91 89.51 104.94 8707.22 8653.22 93.05 10236.19 90.15 101.46 8707.30 8653.30 86.36 10269.07 89.45 96.17 8707.42 8653.42 81.32 10304.25 87.57 91.79 8708.33 8654.33 78.88 10336.39 85.36 89.49 8710.31 8656.31 78.52 10368.19 86.68 85.93 8712.52 8658.52 79.79 10400.21 90.09 82.98 8713.42 8659.42 82.89 10434.65 91.20 80.23 8713.04 8659.04 87.91 10473.13 91.38 87.55 8712.17 8658.17 92.00 10516.89 89.82 92.56 8711.71 8657.71 91.96 10555.87 89.48 99.28 8711.95 8657.95 87.94 10586.41 86.26 96.41 8713.08 8659.08 83.78 10613.39 90.98 93.52 8713.73 8659.73 81.45 10652.45 90.74 90.03 8713.15 8659.15 80.24 10683.87 89.32 85.90 8713.13 8659.13 81.35 10723.31 89.57 83.68 8713.51 8659.51 84.93 10755.11 89.42 81.61 8713.79 8659.79 89.00 10785.31 91.20 78.61 8713.63 8659.63 94.19 10816.85 90.83 74.98 8713.07 8659.07 101.39 10850.77 92.39 70.95 8712.12 8658.12 111.32 10883.13 90.00 65.79 8711.44 8657.44 123.24 10914.93 92.46 61.72 8710.76 8656.76 137.30 10948.29 91.10 58.53 8709.72 8655.72 153.90 10978.09 90.67 54.76 8709.26 8655.26 170.28 11009.31 90.03 58.16 8709.07 8655.07 187.53 11039.69 92.09 63.23 8708.51 8654.51 202.39 11069.33 91.07 68.33 8707.69 8653.69 214.54 11101.21 91.07 73.53 8707.10 8653.10 224.95 11131.47 92.15 79.23 8706.25 8652.25 232.07 11170.29 91.90 85.64 8704.87 8650.87 237.18 11202.23 .91.32 88.21 8703.97 8649.97 238.89 E/W MapN MapE VS DIS Tool ft ft ft ft deg/100ft 3628.60 5960564.52 695357.46 3636.76 20.75 MWD 3639.55 5960563.45 695368.44 3647.62 21.24 MWD 3853.96 5960563.30 695382.86 3661.99 16.27 MWD 3671.22 5960562.47 695400.15 3679.16 17.91 MWD 3690.25 5960559.52 695419.25 3697.99 19.90 MWD 3708.94 5960555.60 695438.05 3716.43 20.56 MWD 3729.80 5960551.16 695459.03 3737.01 21.93 MWD 3756.29 5960544.78 695485.69 3763.10 24.19 MWD 3783.72 5960537.52 695513.31 3790.09 19.47 MWD 3811.86 5960531.23 695541.62 3817.84 22.39 MWD 3840.22 5960526.17 695570.11 3845.86 25.24 MWD 3868.61 5960521.91 695598.62 3873.96 24.30 MWD 3900.65 5960519.25 695630.74 3905.79 16.65 MWD 3936.14 5960516.51 695666.31 3941.05 11.87 MWD 3965.18 5960511.88 695695.47 3969.77 17.33 MWD 3994.01 5960504.42 695724.50 3998.14 19.41 MWD 4023.05 5960493.32 695753.84 4026.55 22.79 MWD 4049.79 5960479.51 695780.94 4052.51 18.59 MWD 4075.32 5960464.19 695806.86 4077.19 6.26 MWD 4102.63 5960448.83 695834.56 4103.64 15.94 MWD 4128.92 5960436.94 695861.17 4129.26 17.25 MWD 4155.42 5960427.49 695887.92 4155.21 14.76 MWD 4184.67 5960419.36 695917.39 4183.97 13.53 MWD 4213.18 5960413.40 695946.05 4212.09 12.08 MWD 4245.66 5960409.20 695978.64 4244.27 16.23 MWD 4280.73 5960407.65 696013.77 4279.18 13.54 MWD 4312.80 5960408.11 696045.84 4311.19 9.91 MWD 4344.49 5960410.19 696077.48 4342.90 11.91 MWD 4376.34 5960414.09 698109.24 4374.87 14.08 MWD 4410.41 5960419.98 696143.17 4409.15 8.61 MWD 4448.63 5960425.05 696181.27 4447.53 19.02 MWD 4492.38 5960426.12 696225.00 4491.21 11.99 MWD 4531.13 5960423.10 696263.84 4529.71 17.26 MWD 4561.35 5960419.70 696294.16 4559.68 14.12 MWD 4588.21 5960418.E 696321.07 4586.39 20.51 MWD 4627.24 5960417.84 696360.11 4625.31 8.96 MWD 4658.64 5960419.76 696391.46 4656.72 13.90 MWD 4697.91 5960424.34 696430.63 4696.12 5.66 MWD 4729.44 5960429.21 696462.05 4727.82 6.53 MWD 4759.19 5960435.16 696491.65 4757.79 11.55 MWD 4789.89 5960443.14 696522.15 4788.82 11.57 MWD 4822.30 5960453.89 696554.30 4821.69 12.74 MWD 4852.36 5960466.58 696584.05 4852.32 17.57 MWD 4880.87 5960481.35 696612.18 4881.51 14.95 MWD 4909.78 5960498.69 696640.66 4911.23 10.39 MWD 4934.66 5960515.70 696865.11 4936.92 12.73 MWD 4960.68 5960533.60 696690.68 4963.78 11.08 MWD 4987.15 5960549.13 696716.77 4990.98 18.01 MWD 5014.17 5960561.97 696743.46 5018.58 17.54 MWD 5044.28 5960573.14 696773.30 5049.19 16.31 MWD 5073.66 5960581.01 696802.49 5078.90 19.16 MWD 5112.10 5960587.09 898840.78 5117.55 16.51 MWD 5143.98 5960589.62 696872.61 5149.47 8.25 MWD by BP Alaska S Baker Hughes 1NTEQ Survey Report 1NTE Q Company: BP Amoco Date: 2!2512008 Tim e: 09:53:44 Page: 3 ::Field: Prudhoe Bay Co-ardinate(NE) Reference: Vllell:18-32, True North Sfte: PB DS 18 Vertical (TVI)) Reference:' 59:32 5/31/1986 09:46 54.0 Well: - 18-32' Section (VS) Reference: Well (O.OON,O.QOE,87.07Azi) Wellpatb: _18-328 Survey Cakrelatioo Metbodc Minimum Curvature i)b: Oracle. Survey MD Intl Azim TVD SysTVb N/S E/W MapN MapE' YS DLS Tool tt deg deg ft ft ft ft ft ft ft deg/100ft 11233.01 91.75 86.57 8703.15 8649.15 240.29 5174.72 5960591.80 696903.29 5180.24 5.51 MWD 11267.55 89.54 82.18 8702.76 8648.76 243.68 5209.08 5960596.06 696937.55 5214.73 14.23 MWD 11297.42 88.68 76.59 8703.23 8649.23 249.18 5238.42 5960602.31 696966.75 5244.31 18.93 MWD 11327.31 89,69 72.69 8703.65 8649.65 257.09 5267.24 5960610.96 696995.35 5273.49 13.48 MWD 11376.00 89.69 72.69 8703.91 8649.91 271.58 5313.72 5960626.62 697041.44 5320.65 0.00 MWD TREE = 41 /8" 5M CMJ W~ELLHEAD= FMC ACTUATOR = KB. ELEV = BAKER C 54.0' BF. ELEV = KOP = Max Angle = 95° 2607' ~ 10915' Datum MD = -- Datum ND = N/A -- 8800' SS 18 3 2 B SAFETY NOTES: OPBd SLTD LNR BH.OW ~ WHIPSTOCK PKR ~ 9704'. WEi.L EJ(CEIDS 70° ~ 9806' AND GOES HORIZONTAL ~ 10201'. 2007 RWO = 4-1/2" CHROME TBG ~ SCAB LNR DRLG DRAFT 2019' 4117' HES 9Cr X-N~, ID = 3.813" GAS LIFT MANDRELS 10-3/4" CSG, 45.5#, L-80, ID = 9.953" 3830' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2999 2981 21 KBG2 SO BK 20 03/05!08 3900 4112" HES 9Cr X -Nipple, ID=3.813 3920' 7-5/8" X 41 /2" BA KER S PKR, 9Cr, 3944' 4-112 "HES 9Cr X- NIP, ID = 3.813" TOP OF 5-i/2" LNR $921' 8916' --{7-5/8" X S-1/2" TNV LMER HGR PKR, ID = 4.880" 5-1 /2" LNR, 17#, L-80, .0232 bpf, ID = 4.897' 8923' " " " 8923 5_1/2 X 4112 XO, ID = 3.958 TOP OF 41/2" LNR ~ 8923' 8938' Top of 3-1 /2" Liner, TOC TOP OF CEMENT $940' 7-518" LNR, 29.7#, S-95, .0459 bpf, ID = 6.875" 8223• 8949' 3-1/2" XN NIP, ID = 2.75" 9240' WHIPSTOCK 10205 3-3/i 6 x 2-7/8 BTT XO STL, ID = 3.19" PERFORATION SUMMARY REF LOG: A NGLE A T TOP PERF: 86° ~ 9870' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 9870 - 10110 U 02/27/08 2" 6 10160 - 10310 O 02/27/08 2" 6 10350 - 10470 O 02!27/08 2` 6 10560 - 1 1330 O 02!27108 41 /2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~--~ 11095' ° ~ 3-3/16" X 2-7%8" anted & perfed ~~ 11375' ~ 9272' 41/2" BKR KB PKR, ID= 2.39" 9277' 3-314" BKR DEPLOYMENT SLV, ID = 3.00" 9318' 3-1 J2" X 3-3116" XO, {7) = 2.80" 9689' TOP OF BKR WHIPSTOCK 8704' TOP OF BKR WHIPSTOCK PKR I I I 9765' 3-3116" X 2-7/8" XO, ID = 2.37" I I I I 11232' HES CIBP, 05/26/02 I I I I 41/2" MILLOUT WINDOW I I PBTD 11535' 968T ' ~~~ I I 2-718" LNR, 6.16#, L-80, 11601' STL, .0058 bpf, ~ = 2.37" DATE REV BY COMMENTS DATE REV BY COMMENTS 10/03/95 ORIGINAL COMPLETION 06/26101 CHITP CTD SIDETRACK 12/28/07 NOES RWO 02!28108 NOROICi CTD SIDETRACK 03/09/08 KSB/PJC GLV CIO (03/05/08) PRUDHOE BAY UNfT WELL: 18-328 PERMIT No: 2071670 API No: 50-029.22585-02 SEC 24, T11 N, R14E, 3632' NSL 8 41' WEL t3P Eipbration (Alaska) ~/ ~® BAKER N~JGF~ES Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY I/XYLUKA'1'lUN (ALASKA) 1NC CUUNl Y NUKfH 5LUYE BOKUUGH WELL NAME 18-32B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 5/1/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1826337 Copies of Copies Digital Copies of Copies Digi[al Each Log of Film Data Each Log of Film Da[a 2 Company BP EXPLORATION (ALASKA) INC i Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By: BAKER ATLAS-PDC 17015 Aldine Westfield Houston Texas 77073 This Distribution List Completed B~ ~~- (~o`~ Page l of 1 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7`~ Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 18-32B Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files} 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MPR/Directional TVD Log (to follow) 1 color prints - MPIZ/Directional Measured Depth Log (to follow) LAC Job#: 1826337 Sent by: Catrina Guidr ~ Date: 05/15/0& Received by: ~ te: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING-& RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 _ Baker Hughes INTEQ 7260 Homer Drive ~G~ Anchorage, Alaska 99518 Direct: (907) 267-6612 Il~ITIQ FAX: (907) 267-6623 l~a~ -~~~ ~ l ~`~5 04/25/08 Schlumberg~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh # NO. 4673 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Inn nocrrinfinn n.,f.. o~ n_i_- 2-52/S-14 11846807 PRODUCTION PROFILE (REDO) 08/18/07 1 1 F-22 12005209 MEM TEMP SURVEY 04/08/08 1 f MPB-09 11963093 MEM PROD PFOFILE ~ ^ 04/13/08 1 1 MPL-33 11963090 MEM INJECTION PROFILE ~ 04/11/08 1 1 MPF-89 11963092 MEM TEMP SURVEY 04/12/08 1 1 L5-29 11963087 MEM TEMP SURVEY ^-Q 04/04/08 1 1 S-26 12071843 SBHP SURVEY ~ 04/03/08 1 1 06-15 11962594 LDL ~ _ (0 04/09/08 1 1 W-30 12034892 PROD PROFILE «$'.../~ J(„/.~ 04/11/08 1 1 L-221 11962592 USIT/CBL ~-~~ ~Q`~ _ ( ~~! 04/07/08 1 1 4-14A/S-37 11970818 CH EDIT PDC GR JEWELRY ~_ ~ 03/24/08 1 18-32B 11978442 MCNL ~ 02/26/08 1 1 G-24A 11660525 MCNL 4t 02/02/07 1 1 r~~ cwcc wnvw~n,un BP Exploration (Alaska) Inc. _ ~ - M .. -r „~, v...-..•~ v„~ vvr , ~^v„ 'v. Petrotechnical Data Center LR2-1 - 900 E. Benson Blvd. - Anchorage, Alaska 99508 Date Delivered: ~'- ~- ' ~ ~ ".u~~~~~~) Alaska Data & Consulting Service 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2838 ATTN: Beth Received by: ''- ~~ r,~~ BAKER HU6ME5 INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Te1907-267-6600 Fax 907-267-6623 To Whom It May Concern: March 7, 2008 Please find enclosed directional survey data for the following wells: A-12A OS-13B 15-45BPB 1 15-45B 18-32B -~ C-35B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration(Alaska)Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: V ,State of Alaska AOGCC DATE: 6 Cc: State of Alaska, AOGCC ~~ ~ ~ ~ r~, ~8 ~ ~ ~_..~ SARAH PALIN, GOVERNOR ~S~A OIL A~D ~S 333 W. 7th AVENUE, SUITE 100 C01~T5ER~A'rI01~ COD'III'II55IOI~T ANCHORAGE, ALASKA 99501.3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Saber CT Drilling Engineer BP Exploration Alaska Inc. PO Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-32B BP Exploration Alaska Inc. Permit No: 207-167 Surface Location: 1647' FNL, 41' FEL, SEC. 24, T11N, R14E, UM Bottomhole Location: 1024' FNL, 950' FWL, SEC. 20, T11N, R14E, UM Dear Mr. Saber: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel Seamount Commissioner DATED this .~ day of December, 2007 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. -~ RECEIV STATE OF ALASKA ~~ ~~ ALAS~IL AND GAS CONSERVATION COM N ~~ ~ (~ ~~~~ PERMIT TO DRILL ~~ . 20 AAC 25.005 Altlittk8 i)~I e~ %~;; :',•'«~an 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. ~ci ,ell ' ~ for: ^Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 18-32B 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12100 TVD 8645ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 1647' FNL 41' FEL SEC 24 T11N R14E UM 7. Property Designation: ADL 028305 Pool , , , . , , Top of Productive Horizon: ~S. 1196' FNL, 4044' FWL, SEC. 19, T11 N, R~4'E, UM 8. Land Use Permit: 13. Approximate Spud Date: January 15, 2008 Total Depth: Y 1024' FNL, 950' FWL, SEC. 20, T11 N, R, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 23,900' 4b. Location of Well (State Base Plane Coordinates): Surface: x-691737 y-5960219 Zone-ASP4 10. KB Elevation (Height above GL): 54' feet 15. Distance to Nearest Well Within Pool: 1,200' 16. Deviated Welts: Kickoff Depth: 9240 feet Maximum Hole An le: 92 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: see Surface: 2437 18. Casin Pr' ram: S ecificatio ns To -`Settin ' De th -Bo ttom uan i of Cem nt c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1/8" 3-3/16"x2-7/8" 6.2# 16.16# L-80 TCII / STL 3160' 8940' 7941' 12100' 8645' 165 sx Class'G' 19. PRESE NT 1NELL CONDITION SUMMARY (To be completed for: RedFill and Re-entry Operations) Total Depth MD (ft): 11601 Total Depth TVD (ft): 8681 Plugs (measured): 8885'& 11232 Effective Depth MD (ft): 11535 Effective Depth TVD (ft): 8680 Junk (measured): None Casing Length Size Cement Volume MD D Conductor /Structural 110' 20" 260 sx Arcticset 110' 110' Surface 3830' 10-3/4" 1283 sx PF'E' 212 sx Class'G' 3830' 3707' Intermediate 9223' 7-5/8" 295 sx Class 'G' 9223' 8226' Production Liner 772' 5-1l2" x 4-1/2" 220 sx Class'G' 8916' - 9688' 7975' - 8565' Liner 2328' 3-1 /2" x 3-3/16" x 2-7/8" 82 sx Class'G' 9272' - 11600' 8265' - 8681' Perforation Depth MD (ft): 10500' - 11530' Perforation Depth TVD (ft): 8695' - 8680' 20. Attachments ^ Filing Fee, $100 ~ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: .Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Greg Sarber, 564-4330 Printed Name reg Sa er Title CT Drilling Engineer Prepared By Name/Number: Si nature "3'~ ~ Phone 564-4330 Date Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: o?O~/ ~O API Number: 50-029-22585-02-00 Permit Approval Date: See cover letter for other re uirements Conditions of Approval: / If box is checked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained shales: Samples Req'd: ^ xes ~No Mud Log Req'd: ^ ,Yes. ~No ~~ ~~ ~g\ ~,0~ ~S~ HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: 1 / ~ <\~~\`-` ~ APPROVED BY THE COMMISSION date ,COMMISSIONER -- Form 10-401 Revised 12/20 5 ~ ~ ~ ~ l ~ ~ ~ S~I~y l` i' O • by BPXA Prudhoe Bay DS 18-32B CTD Sidetrack November 28, 2007 CTD Sidetrack Summary Rig Workover Operations: (Scheduled to begin on December 15, 2007) To be performed by a workover rig from the BP workover group. Pre-CT Rig Work: (Performed post workover operations) 1. Pull BPV. 2. Slickline pull sheared DCR valve in upper GLM, and dummy off. 3. Slickline pull ball and rod, and RHC plug from nipple below packer, run whipstock drift to PBTD. 4. Bleed T, IA, OA to zero. 5. Set BPV 6. Bleed production flow lines and GL lines down to zero and blind flange. (Should already be done) 7. Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on January 15, 2008 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. 3. RU Coil. RIH with a 3.80" D-331 DSM on a mill and motor. Cleanout to bridge plug at 9,270'. 4. RIH with a dummy whipstock drift on coil tubing. Tag top of bridge plug at 9,270'. 5. RIH with a Baker TT 4-1/2" monobore whipstock. Set top at 9,240'. 6. Mill 3.80" window at 9,240'. 7. Drill build/turn section with 3.75" x 4.125" bicenter bit, and land well. 8. Drill lateral section to 12,100'. 9. Run and cement a 2-7/8" x 3-3/16" L-80 liner string~abandoning oerfs in parent wellbore. 10. Make a cleanout run with mill and motor and SWS G~R-CNL logging tool. 11. Perforate well. 12. Circulate well to KWF brine. FP well to 2000' with diesel. 13. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 14. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run live gas lift design. Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75°x4-1/8" (bi-center bits used) Casing Program: fully cemented~er • 3-3/16", L-80 6.2# TCII 8,940' and - 10,200' and • 2-7/8", L-80 6.16# STL 10,200' and -12,100' and • A minimum of 34 bbls 15.8 ppg cement will be used for liner cementing. (Assuming 4-1/8" bit size and TD @ 12,100', with 40% excess in the open hole interval) • TOC planned at 8,940' Existing casins~/tubing Information 10-3/4", L-80 45.5#, Burst 5210, collapse 2480 psi 7 5/8", S-95 29.7#, Burst 6890, collapse 4790 psi 4-1 /2", L-80 12.6#, Burst 8430, collapse 7500 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 91.9 deg at 11,465'. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 23,900 ft. • Distance to nearest well within pool -1,200 ft. (18-16B) Logging • MWD directional, Gamma Ray will be run over all of the open hole section. • A cased hole MCNL/GR/CCL log will be run. Hazards The maximum recorded H2S level on DS 18 is 20 ppm on well 18-14B. • Lost circulation risk is medium. Reservoir Pressure • The reservoir pressure on 18-32A is unknown. After a significant increase in water production in April of 2006, a static bottom hole pressure survey was run and produced water samples were taken. SBHP was measured at 3,993 psi at 8800'ss (8.73 ppg EMW). This pressure was much higher than expected, and not consistent with expected Ivishak pressures in the region. Fluid analysis indicates that the produced water is consistent with water from the cretaceous. Mechanical integrity testing has confirmed a failed IA with a leak rate of 2 bpm at 1500 psi. A cretaceous leak is suspected which would account for the higher than expected pressure and water production. Due to debris in the wellbore, it is not possible to pull the isolation plug in the XN nipple to obtain an accurate indication of formation pressure in this well. • DS 18-16 is an offset well in the same fault block as the current 18-32A lateral. It is a good analog for 18-32A. DS 18-16 had a bottom hole pressure in August of 2007 of 3,317 psi at 8800' TVD (7.25 ppg eq.) See spider map below for location comparison between DS 18-16 and DS 18-32A. ~ ~ ~ • Z1A ~ MIX Of Z2 L ~Z1AlIB ® LT81WH1 L2-IB Zt e CBT-OndinB 1 Z2A ZI BMA RBT HntlUB r ... ~7 !':(I , r ' -'JJ~ Z2B Q RWO PreposOd 19-188 t IB-lfR i , 18-16 /, ~. ~ t6-32 ~ 1 0~ Q~°'~ 8-32R ,,.Z~ ~ 1~~ P81 1 05~~ Q~OP/ i ~ -B2 ~ ~ ~ ~ /' 10 ti ~ ~ ~ ~ 18 l 8-ISR -28PB1 1 ~ ~ ~ r'~ -28 ~ 18-I58 ~ ;~ 19-128 • I i ?' Q a alo;a tr51 ~ ~' L / ~ Q P8 ~ L 0 ~ ~ ~i.N;: -r.~ ,~~~} \1 \ :9-138 ._..... • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,437 psi. Greg Sarber CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble L2-08A SI 8199 - o.a -.:~ - TTP set 1;'0' Cret leak^^ Iz. a~ -2 18-25RP81 -25R ~8-12 I1-28R t 1-28~,~ -12 ` ~ TREE _ -118" 5M CM/ W9-LFfAD = FMC ~ Q ~ ~~ SAFETY NOTES: OPEN SLTD LNR BELOW ACTUATOR = BAKER C ~ {~ W HIPSTOCK PKR ~ 9704'. W 0.L EXCEEDS ~• ~~ _ ~.0' 70° ~ 9806' AND GOES HOFBZONTAL+~ 10201'. 8F. ELEi/ _ KOP = 260T Aix Angle = 99 ~ 1025T 2217' 4112` CAMCO TRCF SSSV O - 3 812" Datum IuD = NIA , . Datum TVD = 8800' SS ® LOCKED OUT (SEf 04/18/96) GAS LJF7MltNOF2ELS 10-3/4" CSG, 45.5#, L•80, ID=9.953' 3830' ST MD TVD DEV TYPE VLV LATCH PORT DATE 3899 3765 34 TMPDX DV BK 0421!99 2 6765 8185 32 TMPDX C1V 8K 04/21/99 3 878'2 7881 32 TMPDX DV BK 0421!99 Minimum ID = 2.37" +~ 976b' 3-3116" X 2-7/8" LNR XO 4-12" TBG, 12,8#, L-80, .0152 bpi, ID = 3.958" ~-{ 8907' ~ 7-518" LNR, 29.711, S-95, TOP OF 5-117' LNR ~ 8921' 0232 bpf, ID = 4.892" 8923' TOP OF 412" LNR 8923' 0459 bPt, ID = 8.875" 9223' PERFORATION SUMMARY REF LOG: Z-Den ON 0925/95 ANGLEATTOPPERF: 91 ~ 10500` Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE 7 6 10500 - 11200 O 0621/01 7' 6 11250 - 11530 O 0621 /01 8885' Hot/7' HES XN Nom, ID1111LLEOT03.80" BY CTD 8888' 4117' 1MRP (5/19/08) 89~' 412" TUBING TAL WLEG ELMD TT NOT LOGGED 8923' i-15-1 /2" X 4112" XO, ID = 3.958" 9272' N 4-12" BKR KB PKR, ID = 2.39" 9277 3-3/4' 8KR DEPLOYMENT SLV, ID = 3.00" 9318' 3-11T X 3-3118" XO, ID = 2.80" 9889' ~ TOP OF BKR WHPSTOCK~ 9704' -~ P OF BKR WHIPSTOCK PKR I I I ~ 9785' 3-3118" X 2-718" XO, 0 = 2.3T' I I 11232' HES cIBP, 05/26/02 I 1 1 4112" MILLOUT WINDOW I I 968T 8696, I I PBTD 11636' I I / i I 2-718" LNR, 8.16#, L-B0, 11601' STL, .0058 bpt, ID = 2.3T' 4-112" LNR, 12.8#, L-80, .0152 bpt, D = 3.958" 11095' QATE REV BY CAMVEIVTS D4TE REV 8Y ~MMENTS 10103185 ORIgNAL COMPLETKNV 06126/01 CHITP CTD~DEiRACK 041D4I02 JKB/KK PERF CORRECTIONS tX26JD2 DDWItA~ SET CIBP O6H5103 CMO/TLP KB ELEVATION CORRECTION 05117/06 JGM 1PJC WRP ®88~i' PRUDFIOE BAY UNR WELL: 18-32A PEF2MfT No: "L011070 AR No: 50-029.71585.00 SEC 24, T11 N, R14E, 3632' NSL & 41' WEL BP Exploration (Alaska) TREE= -1i8"SMCNV ~~~D= FMS 18-32B SAFETY NOTES: OPEN SLTD LNR BELOW WHIPSTOCK PKR ~ 9704'. WELL EXCEEDS 70° ~ 9806' AND GOES HORRONTAL (aA 10201'. PRUDFIDE BAY UP(T WELL: 18-32A R3iMi No' 201 t 070 AR No 50-029-22585-00 SEC 24, T71 K R14E, 3632' NSL 8 41' WEL BP Explo-ation (Alaska) DATE REV BY COW1tiENTS DATE REV BY OOMIuQ~(TS 10/03/95 ORIGINAL COMPLETION 06/26101 CH/TP CTD SIDETRACK 04!04102 JKBIKK PERF OORRECTIONS 0526102 DOJWdh SET GBP 06/15103 CMOITLP KB ELEVATION CORRECTION 05/17/06 JGM.IPJC WRP@ 8865' ,~ ~~ _ ~_o'~ Proposed CTD Sidetrac'~: Rig Floor to Top of Well DS 18-32 2.50 9.23 ~~~ ~ubrica*.a' ID = s.3?5" ui~h 6' O'is unicnS ? 1 '16" Ann~lat x 500o psi 5.00 ~- ~ t'ts" sooo psi, RX-as Blin : ~;f'r,:as 12.65 ~~ T' ' 13.56 -' _.:n'iia•.: ' ~ 7 1'16" SOOO psi RX-4s 2 1'16" 5000 psi . R-2- `~ ~ _ Mud Cross HCR M ~ Muacroe~ HCR 14.89 ~ _ _ Chose Line Kill Line 16.10 ~-_ ~ ~; ~' o; 3 1 e 2 1 '16" 5000 pSi . RX-24 Vai.a:d~ ~,:.nt 16.66 ~ :::ru: •- 7 t't 6" X 3 1'8" Flanged Adapter ~ . lT-~, , 20.04 '~ Cj Swab Valve Tree Size ,: •, D -- Row t.irt~ ~ 22.88 f Q SSV 24.86 --~ ~ Master Valve 26.68 Lock Down Screws 31.00 ~ ~ Ground Level sr BP Alaska by 1NTE Baker Hughes INTEQ Planning Report Q Company: BP Amoco Date: 11/7/2007 Time: 10:05:15 Page: 1 Fceld: Prudhoe Bay Co-ordinate(NE) Reference: ` WeH: 18-32, True North Site: PB DS 18 Vertical (TVD) Reference: 59 :32 5/31!1996 09:46 54.0 Well: 18-32 Section (VS) Reference: Well (O.t)ONO.OOE,8000Azi) Welipatht Plan 2, 18-326 Smvcy Calculation Method: ':Minimum Curvature Db: Sybase Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213. 15 ft Latitude: 70 17 35.252 N From: Map Fasting: 691583. 44 ft Longitude: 148 26 55.555 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.46 deg Well: 18-32 Slot Name: 32 18-32 Well Position: +N/-S 1002.27 ft Northing: 5960219. 60 ft Latitude: 70 17 45.110 N +E/-W 178.86 ft Fasting : 691736. 69 ft Longitude: 148 26 50.341 W Position Uncertainty: 0.00 ft Wellpath: Plan 2, 18-32B Drilled From: 18-32 Tie-oa Depth: 9176.45 ft Current Datum: 59:32 5/31 /1996 09 :46 Height 54. 00 ft Above System Datum: Mean Sea Level Magnetic Data: 11!6/2007 Declination: 23.64 deg Field Strength: 57670 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 38.00 0.00 0.00 80.00 Plan: Plan #2 Date Composed: 11/6/2007 copy Lamar's plan 2 Version: 4 Principal: Yes Tied-to: From: Definitive Path Targets Map Map' <...~ Latitude ---_> <.-- Longitade ---> Name Description TVI) +N/-S +FJ-W .Northing Fasting Deg Min See Deg Min Sec Dip. Dir. ft ft ft ft ft 18-32B Polygon 54.00 310.62 3837.70 5960628.00 695565.00 70 17 48.155 N 148 24 58.479 W -Polygon 1 54.00 310.62 3837.70 5960628.00 695565.00 70 17 48.155 N 148 24 58.479 W -Polygon 2 54.00 124.30 3886.97 5960443.00 695619.00 70 17 46.322 N 148 24 57.045 W -Polygon 3 54.00 -15.65 4627.68 5960322.00 696363.00 70 17 44.942 N 148 24 35.458 W -Polygon 4 54.00 94.02 4916.59 5960439.00 696649.00 70 17 46.019 N 148 24 27.035 W -Polygon 5 54.00 197.55 5289.38 5960552.00 697019.00 70 17 47.034 N 148 24 1&.167 W -Polygon 6 54.00 597.75 6149.92 5960974.00 697869.00 70 17 50.964 N 148 23 51.075 W -Polygon 7 54.00 788.89 5833.67 5961157.00 697548.00 70 17 52.846 N 148 24 0.289 W -Polygon 8 54.00 256.96 4960.77 5960603.00 696689.00 70 17 47.621 N 148 24 25.744 W -Polygon 9 54.00 145.46 4625.79 5960483.00 696357.00 70 17 46.526 N 148 24 35.510 W 18-32B Fault 6 54.00 1126.13 2811.11 5961417.00 694518.00 70 17 56.180 N 148 25 28.393 W -Polygon 1 54.00 1126.13 2811.11 5961417.00 694518.00 70 17 56.180 N 148 25 28.393 W -Poygon 2 54.00 751.96 2733.54 5961041.00 694450.00 70 17 52.500 N 148 25 30.659 W -Polygon 3 54.00 -718.65 3323.25 5959586.00 695077.00 70 17 38.035 N 148 25 13.487 W -Polygon 4 54.00 -1225.61 3353.33 5959080.00 695120.00 70 17 33.049 N 148 25 12.617 W -Polygon 5 54.00 -2577.99 3975.07 5957744.00 695776.00 70 17 19.745 N 148 24 54.519 W -Polygon 6 54.00 -1225.61 3353.33 5959080.00 695120.00 70 17 33.049 N 148 25 12.617 W -Polygon 7 54.00 -718.65 3323.25 5959586.00 695077.00 70 17 38.035 N 148 25 13.487 W -Polygon 8 54.00 751.96 2733.54 5961041.00 694450.00 70 17 52.500 N 148 25 30.659 W 18-32B Fault 3 54.00 1308.28 5120.65 5961658.00 696822.00 70 17 57.959 N 148 24 21.063 W -Polygon 1 54.00 1308.28 5120.65 5961658.00 696822.00 70 17 57.959 N 148 24 21.063 W -Poygon 2 54.00 -6f 3.99 5807.87 5959754.00 697558.00 70 17 39.049 N 148 24 1.073. W 18-32B Fault 4 54.00 1819.29 4461.43 5962152.00 696150.00 70 18 2.989 N 148. 24 40.272 W -Poygon 1 54.00 1819.29 4461.43 5962152.00 696150.00 70 18 2.989 N 148 24 40.272 W -Poygon 2 54.00 664.30 6364.70 5961046.00 698082.00 70 17 51.617 N 148 23 44.813 W • BAs BP Alaska by I1VTE Baker Hughes INTEQ Planning Report Q Company: BP Amoco Date: 11/7/2007 Time: 10:05115 Page: 2 Field: Prudhoe Bay Co-ordinate(NE} R~'erenee: WeII: t8-32, Troe North Site: PB pS 18 Vertical (1'VD) Iteterence: 59:32 5/31!1996 09:46 54.0 Well: 18-32 Sectioq(VS) lte[erencez Well (OOON,O.OOE,80.OOAzi) Weupath: Plan 2, 18-328 Survey Calculation Method: Minimum Curvature Db: Sybase Targets Map Map <--' Latitude ----~ <--- Longitude ---> Name Description TVD +N/-S +FJ-W Northing Fasting: Deg:Min Sec Deg Min Sec IAp. Dir. ft ft ft ft ft 18-32B Fauft 5 54.00 1011.30 3351.39 5961316.00 695061.00 70 17 55.048 N 148 25 12.645 W -Polygon 1 54.00 1011.30 3351.39 5961316.00 695061.00 70 17 55.048 N 148 25 12.645 W -Polygon 2 54.00 531.59 3803.33 5960848.00 695525.00 70 17 50.328 N 148 24 59.477 W 18-32B Fauk 1_TopShub 54.00 455.65 3525.28 5960765.00 695249.00 70 17 49.583 N 148 25 7.583 W -Polygon 1 54.00 455.65 3525.28 5960765.00 695249.00 70 17 49.583 N 148 25 7.583 W -Polygon 2 54.00 59.66 3754.27 5960375.00 695488.00 70 17 45.687 N 148 25 0.914 W 18-326 Fault i BottSad 54.00 484.47 3611.05 5960796.00 695334.00 70 17 49.866 N 148 25 5,083 W -Polygon 1 54.00 484.47 3611.05 5960796.00 695334.00 70 17 49.866 N 148 25 5.083 W -Polygon 2 54.00 137.97 3939.34 5960458.00 695671.00 70 17 46.456 N 148 24 55.519 W 18-326 Target 5 8699.00 628.95 5946.63 5961000.00 697665.00 70 17 51.272 N 148 23 57.000 W 18-32B Target 4 8709.00 358.18 5384.51 5960715.00 697110.00 70 17 48.613 N 148 24 13.391 W 18-32B Target 1 8714.00 200.23 3929.92 5960520.00 695660.00 70 17 47.069 N 148 24 55.792 W 18-326 Target 2 8719.00 117.75 4418.01 5960450.00 696150.00 70 17 46.255 N 148 24 41.567 W 18-328 Target 3 8724.00 142.53 4818.79 5960485.00 696550.00 70 17 46.496 N 148 24 29.885 W Annotation MD TVD ft ft 9176.45 8189.33 TIP 9240.00 8239.65 KOP 9260.00 8255.29 End of 9 Deg/100ft DLS 9290.00 8277.54 4 9425.00 8391.14 5 9500.00 8463.64 6 9915.00 8714.46 End of 20 Deg/100ft DLS 10100.00 8716.03 8 10440.00 .8718.55 9 10630.00 8721.31 10 10850.00 8723.84 11 11000.00 8722.21 12 11255.00 8715.70 13 11465.00 8709.16 14 11605.00 8705.73 15 11955.00 8700.78 16 12100.00 0.00 TD Plan Section Inforr~tion MD Inct Azim TVD +N/-S +E!-W DLS Build Tarn -TFO Target ft deg deg ft ' ft ft deg/100ft deg/100ft deg/100ft deg 9176.45 37.62 75.20 8189.33 251.03 3471.92 0.00 0.00 0.00 0.00 9240.00 37.67 74.71 8239.65 261.11 3509.40 0.48 0.08 -0.77 279.29 9260.00 39.47 74.71 8255.29 264.40 3521.43 9.00 9.00 0.00 0.00 9290.00 44.75 78.97 8277.54 268.94 3541.01 20.00 17.60 14.19 30.00 9425.00 19.69 99.37 8391.14 274.43 3611.41 20.00 -18.56 15.12 165.00 9500.00 11.22 149.07 8463.64 266.06 3627.72 20.00 -11.29 66.26 145.00 9915.00 89.50 94.67 8714.46 203.09 3905.68 20.00 18.86 -13.11 305.00 10100.00 89.54 116.87 8716.03 153.11 4082.59 12.00 0.02 12.00 90.00 10440.00 89.65 76.07 8718.55 115.58 4413.32 12.00 0.03 -12.00 270.00 10630.00 88.71 98.86 8721.31 123.93 4601.87 12.00 -0.50 11.99 92.50 10850.00 90.00 72.49 8723.84 140.40 4819.29 12.00 0.59 -11.99 272.60 11000.00 91.23 54.53 8722.21 207.03 4952.98 12.00 0.82 -11.97 274.00 11255.00 91.62 85.13 8715.70 293.89 5189.43 12.00 0.15 12.00 88.90 C~ ~~ BP Alaska by INTE Baker Hughes INTEQ Planning Report Q Company: BP Amoco Date. if/7/2007 Time: 10:05:15 Page: 3 Field:.. P rudhoe Bay. Co-ordinate(NE) References Well: 1 8-32, True North Site: P B DS 18 yerdcal (TVD) Reterencec 59:32 5/31/1996 09:46 54.0 Well: 18-32 Section (V5)12eference: Well {O:OON,O.OOE,80.OOAzi) Wellpath: Plan 2, 18-326: Snrvey Calculation Method: Minimum Curvature Db: Sybase Plan Section Information MD' Ind Azim TVD +N/-S +E/-W DLS Bgild Turn TFO Target.:: ft deg '... deg ft ft ft deg/1OOft degl100ft degl100ft deg 11465.00 91.89 59.92 8709.16 356.40 5388.03 12.00 0.13 -12.01 271.00 11605.00 90.89 43.15 8705.73 443.14 5497.22 12.00 -0.72 -11.98 266.80 11955.00 90.66 85.15 8700.78 592.33 5805.17 12.00 -0.07 12.00 90.00 12100.00 90.63 67.75 8699.14 626.17 5945.58 12.00 -0.02 -12.00 270.00 .SUrVey MD Ind Azim SS TVl) N/S ' E/W MapN MapE DLS VS TFO Too ft deg deg ft ft ft ft ft deg/100ft' ft deg- 9176.45 37.62 75.20 8135.33 251.03 3471.92 5960559.10 695200.88 0.00 3462.77 0.00 MWD 9200.00 37.64 75.02 8153.98 254.73 3485.82 5960563.15 695214.67 0.48 3477.09 279.29 MWD 9240.00 37.67 74.71 8185.65 261.11 3509.40 5960570.13 695238.09 0.48 3501.43 279.43 MWD 9260.00 39.47 74.71 8201.29 264.40 3521.43 5960573.72 695250.03 9.00 3513.85 0.00 MWD 9290.00 44.75 78.97 8223.54 268.94 3541.01 5960578.76 695269.49 20.00 3533.92 30.00 MWD 9300.00 42.82 79.73 8230.76 270.22 3547.81 5960580.21 695276.25 20.00 3540.84 165.00 MWD 9400.00 24.05 92.73 8313.94 275.36 3602.16 5960586.74 695330.44 20.00 3595.25 164.45 MWD 9425.00 19.69 99.37 8337.14 274.43 3611.41 5960586.04 695339.71 20.00 3604.20 153.44 MWD 9500.00 11.22 149.07 8409.64 266.06 3627.72 5960578.10 695356.23 20.00 3618.81 145.00 MWD 9600.00 27.93 112.33 8503.82 248.63 3654.66 5960561.37 695383.61 20.00 3642.31 305.00 MWD 9700.00 47.19 103.20 8582.78 231.18 3712.62 5960545.40 695441.99 20.00 3696.36 340.10 MWD 9800.00 66.81 98.56 8637.00 215.81 3794.61 5960532.12 695524.34 20.00 3774.44 347.45 MWD 9900.00 86.54 95.15 8659.94 204.37 3890.75 5960523.14 695620.73 20.00 3867.13 350.01 MWD 9915.00 89.50 94.67 8660.46 203.09 3905.68 5960522.24 695635.69 20.00 3881.61 350.81 MWD 10000.00 89.51 104.87 8661.20 188.68 3989.33 5960509.97 695719.68 12.00 3961.49 90.00 MWD 10100.00 89.54 116.87 8662.03 153.11 4082.60 5960476.80 695813.81 12.00 4047.16 89.91 MWD 10200.00 89.55 104.87 8662.83 117.55 4175.86 5960443.62 695907.95 12.00 4132.83 270.00 MWD 10300.00 89.58 92.87 8663.60 102.15 4274.48 5960430.75 696006.92 12.00 4227.28 270.10 MWD 10400.00 89.63 80.87 8664.30 107.59 4374.14 5960438.73 696106.41 12.00 4326.37 270.19 MWD 10440.00 89.65 76.07 8664.55 115.58 4413.32 5960447.72 696145.37 12.00 4366.35 270.27 MWD 10500.00 89.34 83.27 8665.08 126.33 4472.31 5960459.97 696204.06 12.00 4426.31 92.50 MWD 10600.00 88.85 95.26 8666.67 127.62 4572.11 5960463.80 696303.79 12.00 4524.81 92.44 MWD 10630.00 88.71 98.86 8667.31 123.93 4601.87 5960460.88 696333.63 12.00 4553.48 92.25 MWD 10700.00 89.10 90.46 8668.65 118.25 4671.56 5960456.97 696403.45 12.00 4621.13 272.60 MWD 10800.00 89.70 78.48 8669.71 127.87 4770.91 5960469.12 696502.51 12.00 4720.63 272.76 MWD 10850.00 90.00 72.49 8669.84 140.40 4819.29 5960482.88 696550.55 12.00 4770.45 272.89 MWD 10900.00 90.42 66.50 8669.66 157.91 4866.10 5960501.58 696596.90 12.00 4819.59 274.00 MWD 11000.00 91.23 54.53 8668.21 207.03 4952.98 5960552.90 696682.49 12.00 4913.68 273.98 MWD 11100.00 91.44 66.53 8665.87 256.13 5039.86 5960604.19 696768.08 12.00 5007.77 88.90 MW D 11200.00 91.57 78.53 866324 286.08 5135.04 5960636.56 696862.46 12.00 5106.70 89.18 MWD 11255.00 91.62 85.13 8661.70 293.89 5189.43 5960645.75 696916.63 12.00 5161.62 89.50 MWD 11300.00 91.71 79.73 8660.39 299.81 5234.00 5960652.81 696961.04 12.00 5206.55 271.00 MWD 11400.00 91.85 67.73 8657.28 327.76 5329.77 5960683.19 697056.06 12.00 5305.72 270.84 MWD 11465.00 91.89 59.92 8655.16 356.40 5388.03 5960713.30 697113.56 12.00 5368.06 270.47 MWD 11500.00 91.65 55.73 8654.07 375.02 5417.64 5960732.68 697142.68 12.00 5400.45 266.80 MWD 11600.00 90.93 43.75 8651.81 439.52 5493.79 5960799.09 697217.16 12.00 5486.64 266.67 MWD 11605.00 90.89 43.15 8651.73 443.14 5497.22 5960802.80 697220.50 12.00 5490.66 266.40 MWD 11700.00 90.87 54.55 8650.27 505.55 5568.63 5960867.01 697290.29 12.00 5571.82 90.00 MWD 11800.00 90.82 66.55 8648.79 554.62 5655.54 5960918.27 697375.92 12.00 5665.93 90.18 MWD 11900.00 90.72 78.55 8647.45 584.54 5750.76 5960950.62 697470.33 12.00 5764.90 90.35 MWD 11955.00 90.66 85.15 8646.78 592.33 5805.17 5960959.79 697524.52 12.00 5819.83 90.51 MWD 12000.00 90.66 79.75 8646.26 598.24 5849.76 5960966.84 697568.95 12.00 5864.77 270.00 MWD 12100.00 90.63 67.75 8645.14 626.17 5945.58 5960997.20 697664.02 12.00 5963.99 269.94 33/1 " i • ~~ ~( ka ~a f f~ 1 Z ~ l' 1~ r 4 3 r I ~~ l ~~-f~ $ 1 ~~ g m ~ L:~I ~ ~_~1i f '$ ~ -r ~ $ U U _ T1 ... !~ ~ I T j yy ii t{ m 4 8i ~ ~ ~ ~~ ~~~ ~~'i r ~~ t FJJ ~r + ~ ~t$ ! f ~4Jtl ~~ E ~ t i~rr tt ~ 1 i ~ ,! Z ~ ~ Q ~ ~„ ! } I•i / + ~ ~~~~'` I ! ` I h ~ ~ -~ ~~ r C ' ~ ~ ~~ iA i / N L W ~ 1~ a ~, m ~ ,' '~ + o~ z s/ ~.;.i.l k~i, I '' 1 r-~ L~ ~ o ~ ~•. ee m ~~ o f f G k.i t w ~~o~~~N~~~~~~~~~~~~ Z I k ,i ~ hn i i ,k'; 8 ~~ ~' ko rFk1c ~ ~ = E g i ~ ,~ 8 ~o s t~I ~i - / ~ _, ~~~ ~ ~ - $ ~S ~ ~ ~~~~x~a~~~~~~~a~ l~~ ~ ~ '~ ~ s .. • ~ aa jj s Q 7 Y~ ~.. ~ $ z ~~-„g ~ ~ ai~~c#ee3~fAA~~id 8 i $ ± s M 8 r W_°`~~,`,-°`~ ~ ~~~G~~~37"•~~iji~!'! yy r °Z', 8 r i n ... s ~~ _'~ $ pa~aA -'3'5.3:':::.^.::.3 3 ~~ ___~. 8 ~ 8 ;` d U' ~ 3~~~4;=~~'a~~~g~:~~ s s s $ g" .g g s s s s w s o ~ Q o y °s 5 ........ss°----- _ _ _ I~IAWOLI (+)4Yot1/1-14i~oS ~ q ~ °w y wLLI. Uu ~ntLS ANTILOLLISION SETTINGS ~ ,,..u.mt ,.,.na, six?sx vwwxan~ WLLLY.\TH DbTllLS NI .Un.~.~ nePW Fm UqM T~ 9uveyii'lan I...1 Pln _. la\.H m~. ,H.-5 ~r'-W Nnrtlenp Fiving latiruuc I.mtemxk >4,i lalcr Ialron McthodAlD Inters el: 5(11X1 „ rw.am. .n\i~ t po U. ')IM as 1_1W~m PbwrJ.PM+`\, nr•?? nit 1/M)2.27 17Xw, 3'XXYI19 (wl f.917i/.eA 7o'17'J3.l1oN WX'?M1'><I. LII\Y s2 DCplh Rengc From: y176.J5 To: 1211111W ~ r.)~AUt 1'mas Maximum Range. Idtl(,.2u Rcrcrcncc: Plan: Plan k2 °',; jw4.>~..x ~~ qw r tt umy .4~MJ xW.. tl,~.l xWn s }?IISSn GSM 5.1mq V ~.\r~4 •r s F"~x Fna T\D 1"e +" I" N LEGEND to + ." . ~ - L2-08A (LZ-08.4), Major Risk • \ L2-08 (L2-08), Major Rlsk L2-10 (L2-10), Major Risk IrY ~>_ y7b,l'y IS-l2 (18-12), Major Risk ~w ~w 18-12 118-12A1. Major Risk ~„ ,,. 18-12 (18-1281. Major Risk tr 18-15(18-I S), Major Risk c" .Y IS-ISA (IS-ISA), Major Risk i , i ~ 18-ISB (18-15B), Major Risk c~~ / i ~~ ~ ~ - _: - - ~~ ~ 901 18-25 (18-25), Major Risk ~ 18-25A(18-25AI,MajorRisk ~~„ ,~~ ~~, ~,,~ ~ '~ ~ ~ ,~~ 18-25APB1(18-25APB1),Major Risk ., „ ~ i % ~' ~~"~, .-' , -. -, 18-28 118-28), Major Risk i i " '" - IS-28PB1 (18-28PB1), Major Risk - - S''y ~ IS-32 (IS-32). Major Risk ) - - •• I8-32 1 IS-32A), Major Risk e ,: 18-33 (18-34). Major Risk Plan 2, IS-32B 9 Plan #2 ;? n" ~I I ~~ ~ ~ ~ ~ ~I I is ~. ,r si . ~ ~ ~ ~ o ~ „ 1 ~,~ ~ ~A \ ~A,~ ,A~\\ ., ~, ~~~ l~~i~, l „ '' t , ,, ) ,),. v+v,'~, ,~~., ~ n - ~~ ~ , ~ ~. ,~ ~~, , \' _ ;,: BAKER r~ ~ ,,. N~IGNES .w ~ „~ s; ~\ ,F INTEQ ,n ,,. )„ a ~, 1"e N i Ixx ~~ " IN-li fl}f-151 _ r,` ie ~i ~m s~ 35+~~i zw .ww i'ai ssaun i~iz i~iw "+66~ ;:~ loi 1 ~6 "r )I"ss ~SSe :'Nw aW+?s - arw iiz; ii - nzm ~z s~ miii ~i: ie ).,+ ma> ~.?~mwn.rt,..ni~~c...~..m.w,'.w. s.P+~~n~.m~is). ml ~5~ _ ii n~ 13W ISW 13 r<~ by BP Alaska Anticollision Report ~.r s ~i~s 1[NTEQ Company; BP Amoco Dste: 11/19/2007 Time: 16:03:38 Page: 1 Fkld: Prudhoe Bay'.. Reference. Site: PB DS 18 Co~erdinate(NE) Reterence: Well: 18-32, True North Reference. Well: 18-32 Vertical (1'Vli) Reference: 59:32 5/31 /1996 09: 46 54.0 Referenee Wellpatti: Plan 2, 18-328 pb: OrBde GLOBAL SCAN APPLIED: All we0paths withie 200'+ t00/1000 of refereece -There are'Rlf6lr~aeells ie thictl'bhl9pal Plan & PLANNED PROGRAM Ieterpolatioe Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 9176.45 to 12 100.00 ft Scae Method: Trav Cylinder North Maximum Radius: 1406.20 ft Error Surface: Ellipse + Casing Survey Program for DeGeitive Wellpath Date: 11/6/2007 Validated: No Version: 0 Planned From To Snrvey Tookode Tool Name ft ft 188.00 9176.45 1 : MWD - Standard (188.00-110 MWD MWD -Standard 9176.45 12100.00 Planned: Plan #2 V4 MWD MWD -Standard Casing Points MD TVD Diameter Hole Size Name ft ft in in 12100.00 8699.14 3.188 4.125 3 3/16" Summary < Offset Wellpath ~ Reference Offset Ctr-Ctr No-Go ' Allowahle Site Well Wellpath MD MD Distance Area Deviation WAreleg ft' ft ft ft ft Lis DS 02 12-03A L2-03A V6 Out of range Lis DS 02 L2-03 L2-03 V1 Out of range Lis DS 02 L2-08A L2-08A V2 12073.56 10375.00 365.95 112.58 253.37 Pass: Major Risk Lis DS 02 L2-08 L2-08 V1 12065.86 10375.00 360.30 113.64 246.66 Pass: Major Risk Lis DS 02 L2-10 L2-10 V1 9609.50 9700.00 236.27 0.00 236.27 Pass: Minor 1110 Lis LPC LPC-02 LPC-02 V1 Out of range PB DS 18 18-01 18-01 V1 Out of range PB DS 18 18-01 18-01A V1 Out of range PB DS 18 18-02 18-02 V1 Out of range PB DS 18 18-02 18-02A V2 Out of range PB DS 18 18-02 18-02AP61 V1 Out of range PB DS 18 18-03 18-03 V3 Out of range PB DS 18 18-03 18-03A V1 Out of range PB DS 18 18-03 18-038 V2 Out of range PB DS 18 18-11 18-11 V4 Out of range PB DS 18 18-11 18-11 DPN V3 Out of range PB DS 18 18-12 18-12 V1 Out of range PB DS 18 18-12 18-12A Vi Out of range PB DS 18 18-12 18-126 V3 Out of range PB DS 18 18-13 i8-13 V3 Out of range PB DS 18 18-13 18-13A V4 Out of range PB DS 18 18-13 18-136P61 V4 Out of range PB DS 18 18-13 18-136P82 V3 Out of range PB DS 18 18-13 18-13PB1 V1 Out of range PB DS 18 18-13 18-13PB2 V3 Out of range PB DS 18 18-13 Plan 4, 18-138 VO Plan Out of range PB DS 18 18-14 18-14 V5 Out of range PB DS 18 18-14 18-14A V4 Out of range PB DS 18 18-14 18-14APB1 V4 Out of range PB DS 18 18-f 4 18-148 V6 Out of range PB DS 18 18-15 18-15 V1 9743.24 10100.00 184.21 0.00 184.21 Pass: Minor 1110 PB DS 18 18-15A 18-15A V1 9575.00 9775.00 904.88 216.44 688.45 Pass: Major Risk PB DS 18 18-15APB1 18-15APB1 V1 Out of range PB DS 18 18-156 18-156 V9 9575.00 9775.00 904.89 216.60 688.29 Pass: Major Risk PB DS 18 18-19 18-19 V1 Out of range PB DS 18 18-22 18-22 V1 Out of range PB DS 18 18-22 18-22A V1 Out of range PB DS 18 18-25 18-25 V1 11283.83 10000.00 855.64 391.67 463.97 Pass: Major Risk PB DS 18 18-25A 1 &25A V1 11289.92 10000.00 865.34 390.21 475.13 Pass: Major Risk PB DS 18 18-25APB1 18-25AP61 V1 11289.92 10000.00 865.34 389.94 475.40 Pass: Major Risk PB DS 18 18-28 18-28 V1 10648.42 10175.00 651.32 425.94 225.38 Pass: Major Risk PB DS 18 18-28PB1 18-28PB1 V1 10648.42 10175.00 651.32 425.85 225.47 Pass: Major Risk PB DS 18 18-29 18-29 V1 Out of range PB DS 18 18-29A 18-29A V1 Out of range • by BP Alaska Antieollision Report ~i~r iNTEQ Company:. BP Amoco Date: 11/1:9/2007 Tun e: 16:03;38 Page: 2 Field: Prudhoe Bay: .. Reference Site: PB DS 18 Co-ordinate(NE) Rtfereace: WeN:18-32, True North Reference Well: 1:8-32 Vertical (TVD) Reference. 59 ; 32.5/31/199609: 46 54.0 Reference Weitpath: Plan 2, 18-328 Db: Orade Summary Offset Welipath ' ~ Reference. Offset - Ctr-Ch No-Go - Allowable Site Wed Welipnth MD MD Distance Area Deviation Warning ft ft ft ft ft PB DS 18 18-298 18-296 V1 Out of range PB DS 18 18-298 18-296P61 V1 Out of range PB DS 18 18-30 18-30 V1 Out of range PB DS 18 18-31 15-31 V4 Out of range PB DS 18 18-31 18-31A V3 Out of range PB DS 18 18-31 18-31 PB1 V3 Out of range PB DS 18 18-32 18-32 V1 9374.85 9375.00 8.28 337.54 -329.26 FAIL: Major Risk PB DS 18 18-32 18-32A V2 9374.85 9375.00 8.28 338.35 -330.07 FAIL: Major Risk PB DS 18 18-33 18-33 V1 Out of range PB DS 18 18-33 18-33A V2 Out of range PB DS 18 18-33 18-33APB1 V3 Out of range PB DS 18 18-34 18-34 V1 1 0765.39 10175.00 217.88 0.00 217.88 Pass: Minor 1/10 Site: Lis DS 02 Well: L2-08A Rule Assigned: Major Risk Wellpath: L2-08A V2 Inter-Site Error: 0.00 ft Reference Offset Semi•Major Aaic CtrvCtr No-Go Allowable NID TVD NID TVD Ref Offset TFO+A ZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft tt ft ft deg deg in ft ft ft 11687.02 8704.47 9150.00 7429.75 63.22 30.79 28.32 335.33 4.500 1402.96 151.92 1251.04 Pass 11690.81 8704.41 9175.00 7447.12 63.57 31.38 29.07 335.62 4.500 1380.50 152.04 1228.46 Pass 11694.74 8704.35 9200.00 7464.47 63.93 31.98 29.85 335.93 4.500 1358.12 152.15 1205.98 Pass 11700.00 8704.27 9225.00 7481.83 64.42 32.75 30.79 336.24 4.500 1335.83 152.56 1183.27 Pass 11703.06 8704.22 9250.00 7499.17 64.68 33.26 31.47 336.56 4.500 1313.62 152.31 1161.30 Pass 11707.45 8704.16 9275.00 7516.52 65.06 33.93 32.33 336.88 4.500 1291.49 152.36 1139.14 Pass 11712.01 8704.09 9300.00 7533.85 65.45 34.62 33.20 337.21 4.500 1269.46 152.38 1117.08 Pass 11716.68 8704.02 9325.00 7551.23 65.85 35.33 34.10 337.55 4.500 1247.47 152.38 1095.10 Pass 11721.44 8703.95 9350.00 7568.67 66.26 36.05 35.02 337.89 4.500 1225.50 152.33 1073.17 Pass 11726.29 8703.87 9375.00 7586.18 66.67 36.78 35.95 338.24 4.500 1203.55 152.23 1051.31 Pass 11731.23 8703.80 9400.00 7603.75 67.06 37.52 36.90 338.60 4.500 1181.61 152.06 1029.55 Pass 11736.25 8703.73 9425.00 7621.39 67.45 38.28 37.87 338.97 4.500 1159.69 151.83 1007.86 Pass 11741.38 8703.65 9450.00 7639.09 67.86 39.06 38.86 339.35 4.500 1137.79 151.55 986.24 Pass 11746.60 8703.57 9475.00 7656.86 68.27 39.85 39.88 339.73 4.500 1115.92 151.22 964.70 Pass 11751.93 8703.49 9500.00 7674.69 68.68 40.65 40.91 340.13 4.500 1094.07 150.81 943.25 Pass 11757.36 8703.41 9525.00 7692.58 69.07 41.47 41.97 340.53 4.500 1072.24 150.31 921.93 Pass 11762.91 8703.33 9550.00 7710.54 69.47 42.30 43.05 340.95 4.500 1050.44 149.75 900.70 Pass 11768.58 8703.25 9575.00 7728.56 69.88 43.13 44.15 341.37 4.500 1028.68 149.10 879.58 Pass 11774.41 8703.16 9600.00 7746.67 70.30 43.97 45.28 341.80 4.500 1006.94 148.39 858.55 Pass 11780.38 8703.08 9625.00 7764.85 70.69 44.84 46.44 342.25 4.500 985.24 147.59 837.65 Pass 1 f 786.5 f 8702.99 9650.00 7783.11 71.09 45.72 47.63 342.70 4.500 963.57 146.72 816.85 Pass 11792.81 8702.90 9675.00 7801.45 71.49 46.62 48.85 343.16 4.500 941.94 145.79 796.15 Pass 11799.27 8702.81 9700.00 7819.87 71.91 47.54 50.09 343.63 4.500 920.34 144.79 775.55 Pass 11805.91 8702.71 9725.00 7838.36 72.30 48.48 51.37 344.11 4.500 898.78 143.68 755.10 Pass 11812.73 8702.61 9750.00 7856.93 72.69 49.44 52.68 344.60 4.500 877.26 142.49 734.77 Pass 11819.74 8702.52 9775.00 7875.57 73.09 50.41 54.03 345.10 4.500 855.78 141.23 714.56 Pass 11826.94 8702.42 9800.00 7894.29 73.49 51.41 55.40 345.62 4.500 834.35 139.87 694.48 Pass 11834.35 8702.31 9825.00 7913.11 73.85 52.41 56.82 346.14 4.500 812.94 138.39 674.54 Pass 11841.97 8702.21 9850.00 7932.05 74.23 53.42 58.26 346.67 4.500 791.55 136.87 654.67 Pass 11849.81 8702.10 9875.00 7951.11 74.62 54.46 59.74 347.21 4.500 770.17 135.30 634.87 Pass 11857.88 8701.99 9900.00 7970.29 74.96 55.51 61.25 347.75 4.500 748.82 133.65 615.1.7 Pass 11866.17 8701.88 9925.00 7989.59 75.30 56.58 62.79 348.30 4.500 727.47 131.95 595.53 Pass 11874.69 8701.77 9950.00 8009.01 75.66 57.66 64.37 348.85 4.500 706.14 130.20 575.94 Pass 11883.44 8701.66 9975.00 8028.55 75.95 58.75 65.98 349.41 4.500 684.83 128.39 556.44 Pass 11892.42 8701.54 10000.00 8048.20 76.26 59.86 67.62 349.98 4.500 663.52 126.54 536.99 Pass 11901.63 8701.43 10025.00 8067.96 76.55 60.98 69.30 350.55 4.500 642.23 124.66 517.57 Pass • by BP Alaska Anticollision Report ~.r 1NTEQ Company: BP AmOCO Date: 11!19/2007 Time: 16:03:38 Page: 3 .'.Field: Prudhoe Bay ' Referetce Site: PB DS 18 Co-ordiuate(NE) Refererce: Well: 18-32, True North Reference Well: 18-32 Vertical (TVD) Reference: ' S9 : 32 5/31/1:996 09: 46 54.0 Refereace WetlpAth: Plan 2, 18-326. Db: Oracle Site: Lis DS 02 Well: L2-08A Rule Assigned: Major Risk Wellpath: L2-08A V2 Inter-Site Error: 0.00 ft Refere®ce Otisef Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD. Ref, Offset TFO+AZI TF0.HS Casing/HSDista®ce Arca Deviation Warnieg ft ft g ft ft ft deg deg in ft ft ft 11911.07 8701.31 10050.00 8087.84 76.80 62.10 71.01 351.13 4.500 620.94 122.73 498.21 Pass 11920.82 8701.19 10075.00 8107.75 77.05 63.19 72.77 351.72 4.500 599.74 120.72 479.02 Pass 11930.98 8701.06 10100.00 8127.57 77.26 64.30 74.60 352.33 4.500 578.70 118.63 460.07 Pass 11941.56 8700.94 10125.00 8147.32 77.44 65.43 76.51 352.97 4.500 557.84 116.50 441.34 Pass 11952.59 8700.81 10150.00 8166.99 77.62 &6.56 78.50 353.63 4.500 537.16 114.36 422.80 Pass 11966.35 8700.65 10175.00 8186.59 77.78 65.91 78.10 354.31 4.500 516.64 111.69 404.95 Pass 11980.36 8700.49 10200.00 8206.10 77.91 64.75 77.19 355.08 4.500 496.25 108.89 387.36 Pass 11993.92 8700.33 10225.00 8225.53 77.96 63.58 76.46 355.98 4.500 476.01 106.26 369.75 Pass 12007.01 8700.18 10250.00 8244.88 77.96 62.40 75.90 356.99 4.500 455.96 104.05 351.91 Pass 12019.76 8700.04 10275.00 8264.08 77.90 61.20 75.54 358.16 4.500 436.21 102.54 333.67 Pass 12032.88 8699.89 10300.00 8282.63 77.78 59.90 75.30 -0.51 4.500 417.30 102.18 315.12 Pass 12046.30 8699.74 10325.00 8300.54 77.61 58.53 75.19 1.00 4.500 399.28 103.48 295.80 Pass 12059.89 8699.58 10350.00 8317.88 77.36 57.10 75.26 2.69 4.500 382.15 106.87 275.28 Pass 12073.56 8699.43 10375.00 8334.68 77.07 55.62 75.51 4.59 4.500 365.95 112.58 253.37 Pass Site: Lis DS 02 Well: L2-08 Rule Assigned: Major Risk Welipath: L2-08 V1 Inter-Site Error: 0.00 ft Reference Ofiset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MI) TVD Ref Offset TFO+AZI TF0.HS Casing!)<fSi)istance Area Deviation Warning ft $ ft ft ft ft deg deg in fC ft ft 11687.02 8704.47 9150.00 7429.75 63.22 30.79 28.32 335.33 1402.96 151.87 1251.09 Pass 11690.81 8704.41 9175.00 7447.12 63.57 31.38 29.07 335.62 1380.50 151.98 1228.52 Pass 11694.74 8704.35 9200.00 7464.47 63.93 31.98 29.85 335.93 1358.12 152.09 1206.03 Pass 11700.00 8704.27 9225.00 7481.83 64.42 32.75 30.79 336.24 1335.83 152.51 1183.32 Pass 11703.06 8704.22 9250.00 7499.17 64.68 33.26 31.47 336.56 1313.62 152.26 1161.36 Pass 11707.45 8704.16 9275.00 7516.52 65.06 33.93 32.33 336.88 1291.49 152.30 1139.19 Pass 11712.01 8704.09 9300.00 7533.85 65.45 34.62 33.20 337.21 1269.46 152.33 1117.13 Pass 11716.68 8704.02 9325.00 7551.23 65.85 35.33 34.10 337.55 1247.47 152.32 1095.15 Pass 11721.44 8703.95 9350.00 7568.67 66.26 36.05 35.02 337.89 1225.50 152.28 1073.22 Pass 11726.29 8703.87 9375.00 7586.18 66.67 36.78 35.95 338.24 1203.55 152.18 1051.37 Pass 11731.23 8703.80 9400.00 7603.75 67.06 37.52 36.90 338.60 118 f .61 152.00 1029.61 Pass 11736.25 8703.73 9425.00 7621.39 67.45 38.28 37.87 338.97 1159.69 151.78 1007.91 Pass 11741.38 8703.65 9450.00 7639.09 67.86 39.06 38.86 339.35 1137.79 151.50 986.29 Pass 11746.60 8703.57 9475.00 7656.86 68.27 39.85 39.88 339.73 1115.92 151.17 964.75 Pass 11751.93 8703.49 9500.00 7674.69 68.68 40.65 40.91 340.13 1094.07 150.76 943.31 Pass 11757.36 8703.41 9525.00 7692.58 69.07 41.47 41.97 340.53 1072.24 150.26 921.98 Pass 11762.91 8703.33 9550.00 7710.54 69.47 42.30 43.05 340.95 1050.44 149.69 900.75 Pass 11768.58 8703.25 9575.00 7728.56 69.88 43.13 44.15 341.37 1028.68 149.04 879.63 Pass 11774.41 8703.16 9600.00 7746.67 70.30 43.97 45.28 341.80 1006.94 148.34 858.60 Pass 11780.38 8703.08 9625.00 7764.85 70.69 44.84 46.44 342.25 985.24 147.54 837.70 Pass 11786.51 8702.99 9650.00 7783.11 71.09 45.72 47.63 342.70 963.57 146.67 816.90 Pass 11792.81 8702.90 9675.00 7801.45 71.49 46.62 48.85 343.16 941.94 145.74 796.20 Pass 11799.27 8702.81 9700.00 7819.87 71.91 47.54 50.09 343.63 920.34 144.74 775.60 Pass 11805.91 8702.71 9725.00 7838.36 72.30 48.48 51.37 344.11 898.78 143.63 755.15 Pass 11812.73 8702.61 9750.00 7856.93 72.69 49.44 52.68 344.60 877.26 142.44 734.82 Pass 11819.74 8702.52 9775.00 7875.57 73.09 50.41 54.03 345.10 855.78 141.17 714.61 Pass 11826.94 8702.42 9800.00 7894.29 73.49 51.41 55.40 345.62 834.35 139.81 694.53 Pass 11834.35 8702.31 9825.00 7913.11 73.85 52.41 56.82 346.14 812.94 138.34 674.60 Pass 11841.97 8702.21 9850.00 7932.05 74.23 53.42 58.26 346.67 791.55 136.82 654.73 Pass 11849.81 8702.10 9875.00 7951.11 74.62 54.46 59.74 347.21 770.17 135.25 634.92 Pass 11857.88 8701.99 9900.00 7970.29 74.96 55.51 61.25 347.75 748.82 133.59 615.22 Pass by BP Alaska Anticollision Report ~.r s iNTEQ :.'Company; BP Amoco Date: 11/19/2007 Time: 16:03: 38 Page: 4 Field: Prudhoe Bay :' Reference Site: PB' DS 18 Go-ordioate(NE) Reference: Weq: 1$-32, True North Reference Well: 1 8-32 Vertical(TVD) Reference. 59:32 5/31/1996 09: 46 54.0 Reference Weilpnt6: PIart2, 18-328 Db: Orade Site: Lis DS 02 Well: L2-08 Rnie Assigned: Major Risk Wellpath: L2-08 V1 later-Site Error: 0.00 ft Reference Offset Semi-MsjorAais Ctr-Ctr No-C:o Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casinj;/HSDistance Area Deviation.- Warning ft ft ft ft ft ft deg deg in ft_ ft ft 11866.17 8701.88 9925.00 7989.59 75.30 56.58 62.79 348.30 727.47 131.89 595.58 Pass 11874.69 8701.77 9950.00 8009.01 75.66 57.66 64.37 348.85 706.14 130.15 575.99 Pass 11883.44 8701.66 9975.00 8028.55 75.95 58.75 65.98 349.41 684.83 128.33 556.50 Pass 11892.42 8701.54 10000.00 8048.20 76.26 59.86 67.62 349.98 663.52 126.48 537.04 Pass 11901.63 8701.43 10025.00 8067.96 76.55 60.98 69.30 350.55 642.23 124.60 517.63 Pass 11911.07 8701.31 10050.00 8087.84 76.80 62.10 71.01 351.13 620.94 122.67 498.27 Pass 11920.82 8701.19 10075.00 8107.75 77.05 63.24 72.77 351.72 599.74 120.71 479.02 Pass 11930.98 8701.06 10100.00 8127.58 77.26 64.41 74.60 352.33 578.70 118.68 460.02 Pass 11941.56 8700.94 10125.00 8147.33 77.44 65.59 76.51 352.97 557.84 116.60 441.24 Pass 11952.58 8700.81 10150.00 8167.00 77.62 66.78 78.49 353.63 537.16 114.52 422.64 Pass 11966.33 8700.65 10175.00 8186.60 77.78 66.18 78.10 354.31 516.63 111.90 404.73 Pass 11980.33 8700.49 10200.00 8206.12 77.91 65.07 77.20 355.08 496.23 109.15 387.08 Pass 11993.88 8700.33 10225.00 8225.56 77.96 63.95 76.46 355.97 475.98 106.58 369.40 Pass 12006.96 8700.18 10250.00 8244.92 77.96 62.82 75.91 356.99 455.93 104.42 351.51 Pass 12019.59 8700.04 10275.00 8264.20 77.91 61.69 75.56 358.16 436.10 103.00 333.10 Pass 12031.78 8699.90 10300.00 8283.39 77.80 60.55 75.42 -0.52 416.55 102.73 313.82 Pass 12043.53 8699.77 10325.00 8302.51 77.65 59.43 75.51 0.98 397.34 104.11 293.23 Pass 12054.87 8699.64 10350.00 8321.54 77.46 58.32 75.86 2.69 378.54 107.62 270.92 Pass 12065.86 8699.52 10375.00 8340.42 77.23 57.24 76.48 4.63 360.30 113.64 246.66 Pass Site: Lis DS 02 Well: L2-10 Rule Assigned: Minor 1/1 0 Wellpath: L2-10 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/FISDistance Area Deviation Warning . ft ft ft ft ft ft deg deg in ft ft ft 9183.68 8195.06 9175.00 8254.36 50.36 120.94 330.28 255.13 7.000 378.59 0.00 378.59 Pass 9203.26 8210.56 9200.00 8275.01 50.49 121.50 328.34 253.34 7.000 368.18 0.00 368.18 Pass 9222.77 8226.01 9225.00 8295.62 50.59 122.07 326.29 251.45 7.000 358.12 0.00 358.12 Pass 9241.81 8241.08 9250.00 8316.19 50.68 122.45 324.13 249.42 7.000 348.42 0.00 348.42 Pass 9257.44 8253.31 9275.00 8336.71 50.75 121.26 321.84 247.13 7.000 339.25 0.00 339.25 Pass 9267.95 8261.36 9300.00 8357.18 50.86 120.33 319.65 243.72 7.000 330.88 0.00 330.88 Pass 9277.40 8268.42 9325.00 8377.61 50.99 119.48 317.33 240.05 7.000 323.61 0.00 323.61 Pass 9286.75 8275.22 9350.00 8398.02 51.10 118.66 314.84 236.29 7.000 317.57 0.00 317.57 Pass 9310.05 8292.24 9375.00 8418.42 51.35 124.81 312.48 231.93 7.000 312.58 0.00 312.58 Pass 9344.73 8319.71 9400.00 8438.80 51.63 134.73 310.53 226.56 7.000 307.57 0.00 307.57 Pass 9383.97 8353.47 9425.00 8459.17 51.80 143.89 309.01 219.44 7.000 302.02 0.00 302.02 Pass 9426.89 8392.92 9450.00 8479.53 51.81 151.15 307.99 207.96 7.000 295.43 0.00 295.43 Pass 9469.22 8433.55 9475.00 8499.87 51.59 155.36 307.48 185.75 7.000 287.51 0.00 287.51 Pass 9503.54 8467.11 9500.00 8520.19 51.31 156.70 307.18 160.98 7.000 278.19 0.00 278.19 Pass 9516.27 8479.54 9525.00 8540.51 51.28 157.53 306.15 168.70 7.000 269.13 0.00 269.13 Pass 9529.27 8492.13 9550.00 8560.86 51.25 158.18 304.95 174.29 7.000 261.05 0.00 261.05 Pass 9542.47 8504.80 9575.00 8581.23 51.22 158.64 303.56 178.19 7.000 254.02 0.00 254.02 .Pass 9555.82 8517.45 9600.00 8601.60 51.21 158.89 301.97 180.77 7.000 248.06 0.00 248.06 Pass 9569.26 8529.99 9625.00 8621.97 51.20 158.95 300.19 182.33 7.000 243.23 0.00 243.23 Pass 9582.72 8542.33 9650.00 8642.33 51.21 158.80 298.23 183.08 7.000 239.60 0.00 239.60 Pass 9596.16 8554.41 9675.00 8662.71 51.22 158.45 296.10 183.20 7.000 237.24 0.00 237.24 Pass 9609.50 8566.14 9700.00 8683.14 51.25 157.92 293.84 182.81 7.000 236.27 0.00 236.27 Pass 9622.69 8577.45 9725.00 8703.64 51.28 157.20 291.48 182.04 7.000 236.75 0.00 236.75 Pass 9635.68 8588.28 9750.00 8724.24 51.33 156.32 289.07 180.99 7.000 238.76 0.00 238.76 Pass 9648.40 8598.58 9775.00 8744.96 51.39 155.31 286.65 179.76 7.000 242.31 0.00 242.30 Pass 9660.80 8608.30 9800.00 8765.78 51.45 154.19 284.27 178.40 7.000 247.35 0.00 247.35 Pass by BP Alaska Anticollision Report ~.r iNTEQ Company: BP Amoco Date: 11M9/Z007 Time: 16:03:38 Page: 5 Field; Prudhoe Bay Reference Site: PB DS 18 Co-ordieate(NE) Reference: WeN: 18-32, True North Reference Well: 18-32. Vertical (TUD) Reference: ' 59::32 5/31/1996 09:46 54.0 Retereaee Wettpat6: Ptan 2, f 8-326: Db: Oracle Site: Lis DS 02 Well: L2-10 Rule Assigned: Minor 1/1 0 Wellpath: L2-10 V1 Inter-Site Error: 0.00 R Reference Offset Sani-Major Axis Ctr-Gtr No-Go Allowable NII) TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistaoce Area Deviation Warning ft ft ft ft ft ft' deg deg in ft ft ft 9672.84 8617.43 9825.00 8786.71 51.52 152.97 281.96 176.99 7.000 253.85 0.00 253.85 Pass 9684.48 8625.94 9850.00 8807.75 51.60 151.67 279.76 175.59 7.000 261.74 0.00 261.74 Pass 9695.71 8633.84 9875.00 8828.90 51.68 150.35 277.68 174.23 7.000 270.95 0.00 270.95 Pass 9706.51 8641.15 9900.00 8850.15 51.77 149.01 275.75 172.93 7.000 281.38 0.00 281.38 Pass 9716.85 8647.87 9925.00 8871.48 51.86 147.68 273.96 171.71 7.000 292.93 0.00 292.93 Pass 9726.77 8654.05 9950.00 8892.79 51.95 146.36 272.28 170.55 7.000 305.38 0.00 305.38 Pass 9736.27 8659.72 9975.00 8914.08 52.04 145.08 270.73 169.46 7.000 318.65 0.00 318.65 Pass 9745.36 8664.91 10000.00 8935.35 52.14 143.84 269.28 168.45 7.000 332.69 0.00 332.69 Pass 9754.04 8669.65 10025.00 8956.58 52.23 142.66 267.94 167.50 7.000 347.42 0.00 347.42 Pass 9762.33 8673.97 10050.00 8977.76 52.32 141.55 266.69 166.61 7.000 362.79 0.00 362.79 Pass 9770.23 8677.90 10075.00 8998.88 52.41 140.50 265.52 165.78 7.000 378.76 0.00 378.76 Pass 9775.00 8680.18 10100.00 9019.96 52.46 140.09 264.50 164.95 7.000 395.29 0.00 395.29 Pass 9784.98 8684.73 10125.00 9040.97 52.59 138.61 263.42 164.28 7.000 412.27 0.00 412.27 Pass 9791.86 8687.69 10150.00 9061.92 52.67 137.78 262.47 163.60 7.000 429.70 0.00 429.70 Pass 9800.00 8691.00 10175.00 9082.80 52.77 136.69 261.55 162.99 7.000 447.54 0.00 447.53 Pass 9804.74 8692.83 10200.00 9103.62 52.83 136.30 260.75 162.37 7.000 465.72 0.00 465.72 Pass 9810.77 8695.06 10225.00 9124.37 52.91 135.67 259.97 161.81 7.000 484.25 0.00 484.25 Pass 9816.52 8697.07 10250.00 9145.04 52.99 135.10 259.23 161.28 7.000 503.12 0.00 503.12 Pass 9825.00 8699.84 10275.00 9165.64 53.10 134.02 258.46 160.81 7.000 522.33 0.00 522.33 Pass 9825.00 8699.84 10300.00 9186.16 53.10 134.59 257.92 160.27 7.000 541.79 0.00 541.79 Pass 9832.29 8702.04 10325.00 9206.61 53.20 133.77 257.24 159.84 7.000 561.52 0.00 561.52 Pass 9837.09 8703.39 10350.00 9227.07 53.26 133.44 256.65 159.42 7.000 581.55 0.00 581.55 Pass 9841.68 8704.61 10375.00 9247.52 53.33 133.16 256.10 159.03 7.000 601.84 0.00 601.84 Pass 9850.00 8706.65 10400.00 9267.98 53.44 132.24 255.48 158.70 7.000 622.42 0.00 622.42 Pass 9850.00 8706.65 10413.00 9278.61 53.44 132.53 255.29 158.50 7.000 633.16 0.00 633.15 Pass Site: PB DS 1 8 Well: 18-15 Rule Assigned: Minor 1/1 0 Wellpath: 18-15 V1 Inter~Site Error: 0.00 ft Reference OtLget Semi-Major Axis Ctr-Ctr No-Go Allowable MD TW MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft R ft ft deg deg in ft ft ft 9178.13 8190.66 9375.00 8527.49 50.33 39.56 265.03 189.84 7.000 560.02 0.00 560.02 Pass 9198.91 8207.12 9400.00 8539.18 50.47 39.89 263.95 188.93 7.000 550.44 0.00 550.43 Pass 9219.56 8223.47 9425.00 8550.68 50.57 40.23 262.84 187.97 7.000 540.87 0.00 540.86 Pass 9240.02 8239.67 9450.00 8561.97 50.68 40.56 261.67 186.96 7.000 531.29 0.00 531.29 Pass 9251.20 8248.45 9475.00 8572.74 50.72 40.84 260.50 185.79 7.000 521.56 0.00 521.56 Pass 9525.00 8488.01 9500.00 8582.92 51.25 42.78 264.15 131.45 7.000 510.53 0.00 510.53 Pass 9533.98 8496.67 9525.00 8592.51 51.24 43.20 263.30 134.69 7.000 491.39 0.00 491.39 Pass 9539.55 8502.01 9550.00 8601.51 51.23 43.60 262.45 136.02 7.000 472.27 0.00 472.27 Pass 9545.23 8507.42 9575.00 8609.92 51.22 44.01 261.50 137.08 7.000 453.24 0.00 453.24 Pass 9550.00 8511.95 9600.00 8617.72 51.21 44.42 260.46 137.57 7.000 434.33 0.00 434.33 Pass 9556.95 8518.50 9625.00 8624.93 51.21 44.83 259.27 138.38 7.000 4 f 5.58 0.00 415.58 Pass 9563.02 8524.18 9650.00 8631.52 51.21 45.24 257.96 138.64 7.000 397.02 0.00 397.02 Pass 9569.24 8529.97 _9675.00 8637.53 51.20 45.65 256.51 138.64 7.000 378.69 0.00 378.69 Pass 9575.00 8535.28 9700.00 8643.04 51.20 46.06 254.92 138.29 7.000 360.62 0.00 360.61 Pass 9582.33 8541.97 9725.00 8648.07 51.21 46.48 253.16 137.94 7.000 342.82 0.00 342.82 Pass 9589.26 8548.25 9750.00 8652.66 51.22 46.89 251.24 137.23 7.000 325.42 0.00 325.41 Pass 9596.52 8554.73 9775.00 8656.86 51.22 47.30 249.11 136.26 7.000 308.48 0.00 308.48 Pass 9604.12 8561.45 9800.00 8660.66 51.24 47.71 246.76 135.01 7.000 292.09 0.00 292.09 Pass 9612.12 8568.41 9825.00 8664.07 51.26 48.12 244.15 133.46 7.000 276.33 0.00 276.33 Pass 9620.55 8575.63 9850.00 8667.09 51.28 48.53 241.26 131.58 7.000 261.37 0.00 261.37 Pass i ~ by BP Alaska Anticollision Report ~.r BAs 1NTEQ Company: BP AmOCO Date: 11/19/2007 Time: 16:03x38 Page: 6 Field: , Prudhoe Bay ReRreaee Site: PB DS 18 Go-ordinate(NE) Reference: We11:18-32, True North Rekre®ce Well: 1 8-32 Vertical (TVD) Reference: ' 59:32 5!3111996 09:46 54.0: Referenee Wellpath: Plan 2 18-328 Db: Oracle Site: PB DS 18 Well: 18-15 Rule Assigned: Minor 1/1 0 Weftpath: 18-15 V1 Inter-Site Error: 0.00 ft Reterenee ONsef Semi-Major Aais Ctr-Ctr No-Go Allowable MD 1'VD MD TVD Ref Offset TFO+AZI 1'FO-HS Casiog/H~istaaee Area Deviation .Warning ft ft _ ft ft _ ft ft deg deg in ft ft_ ft 9629.46 8583.13 9875.00 8669.72 51.31 48.94 238.03 129.33 7.000 247.36 0.00 247.36 Pass 9638.90 8590.92 9900.00 8671.96 51.35 49.35 234.46 126.70 7.000 234.43 0.00 234.43 Pass 9648.94 8599.01 9925,00 8673.81 51.39 49.75 230.53 123.68 7.000 222.73 0.00 222.73 Pass 9659.63 8607.40 9950.00 8675.28 51.45 50.15 226.25 120.29 7.000 212.35 0.00 212.35 Pass 9671.05 8616.09 9975,00 8676.38 51.51 50.55 221.63 116.54 7.000 203.43 0.00 203.42 Pass 9683.28 8625.07 10000,00 8677.10 51.59 50.95 216.73 112.49 7.000 196.09 0.00 196.09 Pass 9696.44 8634.35 10025,00 8677.54 51.69 51.33 211.63 108.22 7.000 190.47 0.00 190.46 Pass 9710.77 8643.96 10050.00 8677.98 51.81 51.71 206.49 103.91 7.000 186.67 0.00 186.67 Pass 9726.35 8653.80 10075.00 8678.41 51.95 52.09 201.45 99.70 7.000 184.63 0.00 184.63 Pass 9743.24 8663.73 10100.00 8678.85 52.11 52.45 196.64 95.71 7.000 184.21 0.00 184.21 Pass 9761.50 8673.55 10125.00 8679.30 52.31 52.79 192.18 92.07 7.000 185.18 0.00 185.18 Pass 9781.12 8683.01 10150.00 8679.79 52.54 53.13 188.19 88.90 7.000 187.31 0.00 187.31 Pass 9802.06 8691.80 10175.00 8680.31 52.80 53.44 184.73 86.24 7.000 190.30 0.00 190.30 Pass 9824.20 8699.59 10200.00 8680.86 53.09 53.74 181.83 84.16 7.000 193.91 0.00 193.91 Pass 9847.35 8706.03 10225.00 5681.47 53.40 54.02 179.53 82.66 7.000 197.88 0.00 197.88 Pass 9871.27 8710.79 10250.00 8682.13 53.74 54.29 177.82 81.74 7.000 202.05 0.00 202.05 Pass 9895.62 8713.64 10275.00 8682.85 54.09 54.54 176.68 81.39 7.000 206.28 0.00 206.28 Pass 9924.03 8714.54 10300.00 8683.63 54.32 54.98 177.31 81.56 7.000 210.49 0.00 210.49 Pass 9968.32 8714.92 10325.00 8684.47 53.80 55.85 182.86 81.79 7.000 213.19 0.00 213.19 Pass 10013.15 8715.31 10350.00 8685.38 52.84 56.25 188.40 81.95 7.000 213.63 0.00 213.63 Pass 10057.78 8715.69 10375.00 8686.36 51.46 56.17 193.85 82.04 7.000 211.78 0.00 211.78 Pass 10100.58 8716.04 10400.00 8687.42 49.82 55.69 198.88 82.08 7.000 207.67 0.00 207.66 Pass 10117.78 8716.18 10425.00 8688.61 50.92 56.47 196.93 82.19 7.000 202.86 0.00 202.86 Pass 10135.21 8716.32 10450.00 8689.89 51.98 57.20 195.02 82.37 7.000 198.99 0.00 198.98 Pass 10152.82 8716.46 10475.00 8691.24 52.99 57.86 193.15 82.61 7.000 196.12 0.00 196.12 Pass 10170.54 8716.60 10500.00 8692.65 53.93 58.45 191.33 82.92 7.000 194.25 0.00 194.25 Pass 10188.33 8716.74 10525.00 8694.12 54.80 58.96 189.55 83.28 7.000 193.30 0.00 193.30 Pass 10206.14 8716.88 10550.00 8695.65 55.61 59.39 187.83 83.69 7.000 193.28 0.00 193.28 Pass 10223.91 8717.02 10575.00 8697.24 56.35 59.74 186.16 84.15 7.000 194.18 0.00 194.18 Pass 10241.60 8717.16 10600.00 8698.85 56.99 60.02 184.52 84.64 7.000 196.02 0.00 196.02 Pass 10259.16 8717.29 10625.00 8700.46 57.56 60.21 182.92 85.14 7.000 198.78 0.00 198.78 Pass 10276.55 8717.43 10650.00 8702.08 58.07 60.32 181.34 85.65 7.000 202.46 0.00 202.46 Pass 10293.72 8717.55 10675.00 8703.69 58.47 60.36 179.79 86.16 7.000 207.04 0.00 207.04 Pass 10310.63 8717.68 10700.00 8705.33 58.81 60.32 178.27 86.67 7.000 212.50 0.00 212.50 Pass 10327.26 8717.80 10725.00 8707.00 59.08 60.21 176.77 87.17 7.000 218.82 0.00 218.82 Pass 10343.55 8717.92 10750.00 8708.71 59.26 60.03 175.31 87.66 7.000 225.99 0.00 225.99 Pass 10359.50 8718.03 10775.00 8710.45 59.38 59.79 173.88 88.14 7.000 233.96 0.00 233.96 Pass 10375.09 8718.13 10800.00 8712.23 59.46 59.49 172.48 88.61 7.000 242.66 0.00 242.66 Pass 10390.31 8718.24 10825.00 8714.06 59.43 59.13 171.09 89.05 7.000 252.05 0.00 252.05 Pass 10405.14 8718.33 10850.00 8715.94 59.38 58.73 169.73 89.48 7.000 262.10 0.00 262.10 Pass 10419.57 8718.43 10875.00 8717.86 59.27 58.29 168.41 89.88 7.000 272.80 0.00 272.80 Pass 10433.57 8718.51 10900.00 8719.81 59.12 57.81 167.11 90.26 7.000 284.24 0.00 284.24 Pass 10470.31 8718.78 10925.00 8721.80 60.04 59.55 170.29 90.59 7.000 295.94 0.00 295.94 Pass 10532.77 8719.51 10950.00 8723.83 61.41 62.88 178.01 90.81 7.000 305.29 0.00 305.29 Pass 10601.08 8720.69 10975.00 8725.88 61.79 65.32 186.34 90.96 7.000 311.44 0.00 311.44 Pass 10638.88 8721.51 11000.00 8727.98 61.88 66.07 188.97 91.18 7.000 314.79 0.00 314.79 Pass 10653.71 8721.82 11025.00 8730.11 62.34 66.20 187.50 91.49 7.000 318.55 0.00 318.55 Pass 10668.39 8722.11 11050.00 8732.27 62.73 66.28 186.06 91.80 7.000 323.08 0.00 323.08 Pass 10682.88 8722.37 11075.00 8734.47 63.06 66.29 184.63 92.11 7.000 328.39 0.00 328.39 Pass 10697.16 8722.61 11100.00 8736.71 63.34 66.24 183.22 92.42 7.000 334.50 0.00 334.50 Pass by BF Alaska Anticollision Report ~.r Is~csi~s 1NTEQ Compagy: BP Amoco Date: 11/19/2007 Tim e: 16:03138 Page:. 7 :.Field: Prudhoe Bay . Retereaee Site: PB DS 18 Co-ordieate(NE) Refereuce: WeR: 18-32, True-North llefereaee Well: 1 8-32 Vertica~(TVD) Reference: 59:33 5/31/1996 09:46 54.0 Reference Wellpath: Plan 2, 1&32 8 Dh: Oracle Site: PB DS 18 Well: 18-15 Rule Assigned: Minorl/1 0 Wellpath: 18-15 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-C.o AtMwaWe ' MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing/H31Lstance Area Deviation Warning ft ft fl ft ft ft' deg deg in ft ft ft 10711.20 8722.82 11125.00 8738.99 63.55 66.13 181.84 92.72 7.000 341.38 0.00 341.38 Pass 10724.99 8723.01 11150.00 8741.30 63.73 65.81 180.47 93.00 349.00 0.00 349.00 Pass 10738.52 8723.18 11175.00 8743.61 63.81 65.42 179.13 93.28 357.31 0.00 357.30 Pass 10751.77 8723.33 11200.00 8745.92 63.89 64.99 177.80 93.54 366.27 0.00 366.27 Pass 10764.73 8723.45 11225.00 8748.23 63.88 64.52 176.49 93.78 375.88 0.00 375.88 Pass 10770.34 8723.50 11236.00 8749.25 63.88 64.31 175.92 93.88 380.30 0.00 380.30 Pass Site: PB DS 18 Well: 18-15A Rule Assigned: Major Risk Wellpath: 18-15A V 1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Gtr-Gtr No-Go Allowable Ml) TW MD TVD Ref Offset TFO+AZI TFO-HS Casiug/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg - in ft ft ft 9176.71 8189.13 9575.00 8722.43 50.32 35.56 246.69 171.49 883.41 160.79 722.62 Pass 9561.13 8522.42 9600.00 8721.89 51.21 38.08 249.27 129.48 884.56 172.98 711.58 Pass 9562.82 8524.00 9625.00 8721.43 51.21 38.33 247.68 128.31 885.54 179.33 706.21 Pass 9564.61 8525.67 9650.00 8721.17 51.20 38.57 246.10 127.t6 887.07 185.63 701.44 Pass 9566.48 8527.41 9675.00 8721.16 51.20 38.81 244.53 126.03 889.39 191.91 697.48 Pass 9568.42 8529.21 9700.00 8721.23 51.20 39.05 242.97 124.92 892.24 198.16 694.09 Pass 9575.00 8535.28 9725.00 8721.31 51.20 39.30 241.34 124.70 895.79 205.26 690.54 Pass 9575.00 8535.28 9750.00 8721.40 51.20 39.52 239.84 123.20 899.97 210.91 689.06 Pass 9575.00 8535.28 9775.00 8721.60 51.20 39.75 238.36 121.72 904.88 216.44 688.45 Pass 9575.00 8535.28 9800.00 8722.12 51.20 39.98 236.90 120.27 910.65 221.81 688.84 Pass 9575.00 8535.28 9825.00 8722.87 51.20 40.21 235.48 118.84 917.47 227.02 690.45 Pass 9581.24 8540.99 9850.00 8723.88 51.21 40.45 233.98 118.56 924.84 232.43 692.41 Pass 9583.64 8543.17 9875.00 8724.92 51.21 40.70 232.57 117.60 932.74 237.53 695.21 Pass 9586.05 8545.35 9900.00 8725.88 51.21 40.95 231.19 116.64 941.35 242.45 698.90 Pass 9588.49 8547.55 9925.00 8726.96 51.21 41.18 229,85 115.71 950.89 247.14 703.74 Pass 9591.02 8549.83 9950.00 8728.30 51.22 41.41 228.54 114.83 961.11 251.65 709.47 Pass 9593.70 8552.23 9975.00 8730.00 51.22 41.64 227.27 113.98 971.74 256.01 715.74 Pass 9600.00 8557.82 10000.00 8732.06 51.23 41.87 225.98 113.64 983.10 260.62 722.48 Pass 9600.00 8557.82 10025.00 8734.41 51.23 42.10 224.84 112.51 995.29 264.18 731.10 Pass 9600.00 8557.82 10050.00 8736.94 51.23 42.33 223.75 111.42 1008.10 267.62 740.48 Pass 9600.00 8557.82 10075.00 8739.44 51.23 42.54 222.67 110.34 1021.07 270.81 750.26 Pass 9608.32 8565.11 10100.00 8741.92 51.25 42.66 221.50 110.32 1034.30 274.11 760.19 Pass 9610.28 8566.82 10116.00 8743.51 51.25 42.75 220.81 .109.89 1043.00 278.14 764.86 Pass Site: PB DS 18 Well: 18-156 Rule Assigned: Major Risk Wellpath: 18-156 V9 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aaiv Ctr-Ctr 1Vo-Go Allowable MD TVI) MD TVD Ref Offset TFO+AZI TFO•HS CastuglHSflistauce Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9176.71 8189.13 9575.00 8722.43 50.32 35.56 246.69 171.49 7.000 883.41 160.95 722.46 Pass 9561.13 8522.42 9600.00 8721.89 51.21 38.08 249.27 129.48 7.000 884.56 173.14 711.42 Pass 9562.82 8524.00 9625.00 8721.43 51.21 38.33 247.68 128.31 7.000 885.54 179.49 706.05 Pass 9564.61 8525.67 9650.00 8721.17 51.20 38.57 246.10 127.16 7.000 887.07 185.79 701.28 Pass 9566.48 8527.41 9675.00 8721.16 51.20 38.81 244.53 126.03 7.000 889.39 192.07 697.32 Pass 9568.42 8529.21 9700.00 8721.23 51.20 39.05 242.97 124.92 7.000 892.25 198.31 693.93 Pass 9575.00 8535.28 9725.00 8721.32 51.20 39.30 241.34 124.70 7.000 895.80 205.42 690.38 Pass 9575.00 8535.28 9750.00 8721.40 51.20 39.52 239.84 123.20 7.000 899.97 211.07 688.91 Pass 9575.00 8535.28 9775.00 8721.60 51.20 39.75 238.36 121.72 7.000 904.89 216.60 688.29 Pass 9575.00 8535.28 9800.00 8722.12 51.20 39.98 236.90 120.27 7.000 910.65 221.97 688.68 Pass by BP Alaska Anticollision Report ~~~ s INTEQ Company:. BP AmoCO Date: 11 /19/2007. Time: 16:43:38 Page: 8 Field: Prudhoe Bay Reference Site: PB DS 18 Co-ordieate(NE) Reference: WeN: 18-32, True!North Refereaee Well: 18-32 Vertical ('I'VI)) Refere®ce: 59:32 5/31/1996 09:48 54.0 Reference Wellpath: Plart 2, 18-32 6 Db: Orade Site: PB DS 18 Well: 18-158 Rule Assigned: Major Risk Wellpath: 18-156 V9 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casiog/H~istanee Area Deviation Warning. ft ft ft ft ft ft deg: deg in ft ft ft 9575.00 8535.28 9825.00 8722.88 51.20 40.21 235.48 118.84 7.000 917.47 227.18 690.29 Pass 9581.24 8540.99 9850.00 8723.88 51.21 40.45 233.98 118.56 7.000 924.84 232.59 692.25 Pass 9583.64 8543.17 9875.00 8724.92 51.21 40.70 232.57 117.60 7.000 932.75 237.69 695.05 Pass 9586.05 8545.35 9900.00 8725.88 51.21 40.95 231.19 116.64 7.000 941.35 242.61 698.74 Pass 9588.49 8547.55 9925.00 8726.96 51.21 41.18 229.85 115.71 7.000 950.89 247.30 703.59 Pass 9591.02 8549.83 9950.00 8728.30 51.22 41.41 228.54 114.83 7.000 961.12 251.80 709.31 Pass 9593.70 8552.23 9975.00 8730.00 51.22 41.64 227.27 113.98 7.000 971.75 256.17 715.58 Pass 9600.00 8557.82 10000.00 8732.06 51.23 41.87 225.98 113.64 7.000 983.10 260.78 722.33 Pass 9600.00 8557.82 10025.00 8734.32 51.23 42.11 224.84 112.51 7.000 995.21 264.40 730.81 Pass 9600.00 8557.82 10050.00 8736.59 51.23 42.35 223.73 111.40 7.000 1007.80 267.87 739.94 Pass 9600.00 8557.82 10075.00 8738.85 51.23 42.58 222.65 110.32 7.000 1020.85 271.18 749.67 Pass 9608.11 8564.93 10100.00 8741.12 51.25 42.80 221.48 110.27 7.000 1034.24 274.74 759.49 Pass 9611.14 8567.56 10125.00 8743.47 51.26 43.04 220.41 109.60 7.000 1047.96 277.94 770.01 Pass 9614.27 8570.26 10150.00 8745.79 51.26 43.28 219.37 108.94 7.000 1061.59 281.06 780.54 Pass 9616.87 8572.49 10175.00 8746.70 51.27 43.50 218.35 108.24 7.000 1076.74 283.92 792.82 Pass 9618.95 8574.28 10200.00 8746.30 51.28 43.69 217.39 107.52 7.000 1093.09 286.55 806.54 Pass 9625.00 8579.40 10225.00 8745.00 51.29 43.85 216.39 107.20 7.000 1110.51 289.27 821.24 Pass 9625.00 8579.40 10250.00 8742.51 51.29 44.02 215.54 106.36 7.000 1128.89 291.33 837.56 Pass 9625.00 8579.40 10275.00 8740.05 51.29 44.19 214.74 105.56 7.000 1147.82 293.23 854.59 Pass 9625.00 8579.40 10300.00 8738.66 51.29 44.39 213.95 104.77 7.000 1166.26 295.15 871.11 Pass 9625.00 8579.40 10325.00 8737.29 51.29 44.63 213.12 103.94 7.000 1183.44 297.17 886.27 Pass 9625.00 8579.40 10350.00 8735.77 51.29 44.88 212.26 103.08 7.000 1199.76 299.21 900.55 Pass 9631.11 8584.50 10375.00 8734.31 51.32 45.10 211.32 102.78 7.000 1215.69 301.40 914.29 Pass 9633.71 8586.66 10400.00 8733.28 51.33 45.34 210.45 102.18 7.000 1231.65 303.36 928.29 Pass 9636.52 8588.98 10425.00 8732.98 51.34 45.57 209.63 101.64 7.000 1248.14 305.19 942.95 Pass 9639.61 8591.50 10450.07 8733.03 51.35 45.82 208.82 101.12 7.000 1264.39 307.03 957.36 Pass 9642.82 8594.11 10475.00 8733.13 51.36 46.07 208.02 100.62 7.000 1280.38 308.81 971.56 Pass 9650.00 8599.85 10500.00 8733.75 51.39 46.28 207.16 100.40 7.000 1296.01 310.73 985.28 Pass 9650.00 8599.85 10525.00 8735.32 51.39 46.58 206.45 99.70 7.000 1310.84 312.29 998.54 Pass 9654.81 8603.65 10550.00 8737.01 51.42 46.84 205.67 99.32 7.000 1325.39 313.95 1011.44 Pass 9659.21 8607.07 10575.00 8738.45 51.45 47.10 204.91 98.91 7.000 1339.90 315.56 1024.35 Pass 9663.67 8610.51 10600.00 8739.57 51.47 47.36 204.15 98.51 7.000 1354.36 317.13 1037.23 Pass 9668.17 8613.93 10625.00 8740.22 51.50 47.81 203.39 98.09 7.000 1368.68 318.65 1050.03 Pass 9675.00 8619.03 10650.00 8740.22 51.54 47.81 202.59 97.78 7.000 1383.12 320.17 1062.95 Pass 9675.00 8619.03 10675.00 8739.72 51.54 48.14 201.92 97.11 7.000 1397.55 321.48 1076.07 Pass Site: PB DS 18 Well: 18-25 Rule Assigned: Major Risk Wellpath: 18-25 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr--Gtr. No-Go Allowable MD TVD NID TVD ReI .Offset TFO+AZI TFO-HS Casing/H~istaece Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft R 10399.81 8718.30 8825.00 7518.22 59.42 58.08 94.76 13.86 1236.11 130.61 1105.50 Pass 10408.56 8718.36 8850.00 7538.26 59.35 57.86 94.18 14.34 1218.05 133.03 1085.02 Pass 10417.25 8718.41 8875.00 7558.25 59.29 57.63 93.63 14.83 1200.16 135.54 1064.61 Pass 10425.90 8718.47 8900.00 7578.14 59.21 57.39 93.11 15.35 1182.51 138.18 1044.33 Pass 10434.57 8718.52 8925.00 7597.86 59.10 57.14 92.62 15.89 1165.21 140.91 1024.30 Pass 10452.84 8718.64 8950.00 7617.41 59.48 57.79 94.06 16.44 1148.23 144.46 1003.77 Pass 10489.22 8718.96 8975.00 7636.79 60.55 59.91 98.91 16.94 1131.32 149.06 982.27 Pass 10528.29 8719.44 9000.00 7655.99 61.35 61.81 104.03 17.37 1114.38 153.21 961.17 Pass 10569.72 8720.10 9025.00 7675.01 61.76 63.40 109.35 17.72 1097.32 156.64 940.68 Pass 10612.96 8720.94 9050.00 7693.86 61.72 64.57 114.80 17.99 1080.09 159.11 920.98 Pass • ap BP Alaska Anticollision Report ~.r s 1NTEQ Company: BP Amoco Date: 11/19!2007 Time: 16:03:38 Page: 9 Field:.: Prudhoe Bay Reference Site: PB DS 18 Co-ordinate(NE) Reference: Well: 18-32, True North. Reference Well: 1: 8-32 Vertical (TVD) Reference: 59:32 5!31!1996 09:46 54.0 Reference Wellpath: Plan 2, 18-32 6 Db: Orade Site: PB DS 18 Well: 18-25 Rule Assigned: Major Risk Wellpath: 18-25 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axic Ctr-Ctr No-Go Allowable MD TVD MD TVD Ret OffseC TFO+AZ I TFO-H$ Gasin~/IISU~tar+ce Area Deviation Warning ft' ft ft ft ft ft deg deg in ft ft ft, 10636.60 8721.46 9075.00 7712.45 61.80 65.00 116.34 18.27 1062.85 161.30 901.55 Pass 10647.45 8721.69 9100.00 7730.77 62.16 65.13 115.41 18.64 1046.03 163.90 882.13 Pass 10658.44 8721.91 9125.00 7748.79 62.46 65.23 114.49 19.05 1029.69 166.66 863.04 Pass 10669.54 8722.13 9150.00 7766.52 62.76 65.30 113.61 19.49 1013.87 169.62 844.25 Pass 10680.72 8722.33 9175.00 7783.95 63.02 65.32 112.74 19.97 998.57 172.77 825.80 Pass 10691.97 8722.52 9200.00 7801.07 63.24 65.31 111.92 20.49 983.82 176.11 807.71 Pass 10703.25 8722.70 9225.00 7817.87 63.44 65.26 111.13 21.05 969.65 179.66 789.98 Pass 10714.55 8722.87 9250.00 7834.37 63.59 65.17 110.38 21.66 956.07 183.40 772.67 Pass 10725.80 8723.02 9275.00 7850.61 63.73 65.07 109.68 22.30 943.04 187.39 755.64 Pass 10736.96 8723.16 9300.00 7866.67 63.80 64.94 109.03 23.00 930.50 191.55 738.96 Pass 10748.02 8723.29 9325.00 7882.52 63.87 64.78 108.44 23.73 918.50 195.91 722.58 Pass 10758.97 8723.40 9350.00 7898.18 63.88 64.58 107.91 24.52 907.04 200.44 706.60 Pass 10769.77 8723.50 9375.00 7913.63 63.88 64.36 107.45 25.35 896.15 205.14 691.01 Pass 10780.43 8723.58 9400.00 7928.89 63.83 64.10 107.04 26.22 885.86 210.00 675.86 Pass 10790.93 8723.65 9425.00 7943.94 63.76 63.82 106.70 27.14 876.20 215.00 661.20 Pass 10801.25 8723.71 9450.00 7958.80 63.67 63.52 106.43 28.10 867.17 220.15 647.01 Pass 10811.35 8723.76 9475.00 7973.55 63.53 63.20 106.23 29.11 858.70 225.40 633.30 Pass 10821.22 8723.79 9500.00 7988.20 63.39 62.87 106.10 30.17 850.84 230.78 620.06 Pass 10830.86 8723.82 9525.00 8002.75 63.22 62.52 106.05 31.27 843.58 236.22 607.37 Pass 10840.26 8723.83 9550.00 8017.19 63.02 62.15 106.06 32.40 836.97 241.71 595.26 Pass 10850.00 8723.84 9575.00 8031.53 62.82 61.73 106.07 33.58 831.02 247.20 583.82 Pass 10858.48 8723.83 9600.00 8045.76 62.58 61.38 106.27 34.80 825.75 252.82 572.94 Pass 10867.29 8723.82 9625.00 8059.88 62.34 60.98 106.47 36.05 821.19 258.37 562.82 Pass 10875.00 8723.79 9650.00 8073.87 62.13 60.64 106.83 37.33 817.38 264.05 553.34 Pass 10884.19 8723.75 9675.00 8087.70 61.82 60.16 107.04 38.64 814.37 269.32 545.05 Pass 10892.28 8723.71 9700.00 8101.37 61.54 59.74 107.40 39.98 812.17 274.65 537.52 Pass 10900.00 8723.66 9725.00 8114.89 61.28 59.34 107.84 41.34 810.78 279.91 530.88 Pass 10907.76 8723.60 9750.00 8128.25 60.96 58.90 108.28 42.71 810.23 284.90 525.34 Pass 10915.15 8723.53 9775.00 8141.45 60.66 58.49 108.78 44.10 810.53 289.76 520.77 Pass 10922.32 8723.46 9800.00 8154.49 60.37 58.07 109.32 45.49 811.67 294.45 517.22 Pass 10929.30 8723.38 9825.00 8167.27 60.06 57.66 109.88 46.89 813.73 298.89 514.83 Pass 10936.20 8723.30 9850.00 8179.52 59.74 57.25 110.43 48.26 816.89 303.00 513.88 Pass 10943.01 8723.21 9875.00 8191.23 59.42 56.84 110.97 49.61 821.13 306.77 514.36 Pass 10950.00 8723.11 9900.00 8202.38 59.09 56.38 111.45 50.94 826.45 310.11 516.34 Pass 10956.35 8723.02 9925.00 8212.97 58.75 55.98 111.98 52.23 832.82 313.20 519.62 Pass 10962.88 8722.92 9950.00 8222.99 58.40 55.54 112.45 53.48 840.21 315.85 524.36 Pass 10969.30 8722.81 9975.00 8232.43 58.06 55.09 112.90 54.69 848.58 318.15 530.42 Pass 11283.83 8714.87 10000.00 8241.30 69.82 72.15 138.05 56.38 855.64 391.67 463.97 Pass 11292.27 8714.62 10025.00 8249.64 69.81 71.98 137.88 57.22 859.26 394.76 464.50 Pass 11300.00 8714.39 10050.00 8257.90 69.80 71.83 137.81 58.08 863.58 397.84 465.74 Pass 11308.62 8714.14 10075.00 8266.17 69.72 71.61 137.63 58.94 868.57 400.49 468.08 Pass 11316.50 8713.90 10100.00 8274.43 69.65 71.40 137.56 59.81 874.23 403.12 471.11 Pass 11325.00 8713.64 10125.00 8282.72 69.57 71.12 137.41 60.68 880.51 405.46 475.05 Pass 11331.70 8713.43 10150.00 8291.12 69.46 70.94 137.49 61.56 887.21 407.85 479.36 Pass 11339.05 8713.21 10175.00 8299.65 69.34 70.69 137.49 62.44 894.32 409.94 484.38 Pass 11350.00 8712.87 10200.00 8308.30 69.15 70.13 137.04 63.31 901.86 410.95 490.91 Pass 11350.00 8712.87 10225.00 8317.02 69.15 70.43 137.94 64.21 909.80 414.53 495.27 Pass 11360.12 8712.55 10250.00 8325.79 68.91 69.89 137.59 65.07 918.17 415.16 503.02 Pass 11366.84 8712.34 10275.00 8334.58 68.75 69.61 137.65 65.94 927.01 416.53 510.48. Pass 11375.00 8712.08 10300.00 8343.41 68.55 69.18 137.52 66.79 936.28 417.27 519.01 Pass • by BP Alaska Anticollision Report /Ii~~ ~i~s 1NTEQ ..Company: BP Amoco Date: 11/19/2007 Time: 16:03:38 Page: 10 Fiehl: Prudhoe Bay Reference Site: PB DS 18 Co-ordi®Ate(NE) Reference: Well: 18-32, True North Refereaee Well: Y 8-32 Vertical{TVD) Reference: 59:32 5/3111996 09:46 54.0 Retereaee Wellpath; Plan 2, 18-326 Db: Orade Site: PB DS 18 Well: 18-25 Rule Assigned: Major Risk Wellpath: 18-25 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-C.a ` Allowable MD TVD MD TVD Ret Offset TFO+AZI TF0.HS Casiog/HSflistasce Area: Deviation Warning ft ft ft $ ft ft deg deg in ft; ft ft 11379.84 8711.93 10325.00 8352.30 68.40 69.03 137.79 67.64 945.94 418.75 527.19 Pass 11386.14 8711.73 10350.00 8361.25 68.21 68.73 137,87 68.48 955.97 419.57 536.40 Pass 11392.29 8711.53 10375.00 8370.27 68.01 68.43 137.96 69.31 966.37 420.26 546.11 Pass 11400.00 8711.28 10400.00 8379.34 67.77 67.96 137.85 70.12 977.14 420.23 556.91 Pass 11400.00 8711.28 10425.00 8388.43 67.77 68.25 138.67 70.95 988.33 422.83 565.51 Pass 11409.98 8710.96 10450.00 8397.51 67.39 67.53 138.25 71.72 999.88 421.42 578.46 Pass 11415.62 8710.78 10475.00 8406.59 67.17 67.22 138.35 72.50 1011.84 421.51 590.33 Pass 11425.00 8710.47 10500.00 8415.62 66.80 66.50 137.96 73.24 1024.25 419.90 604.36 Pass 11425.00 8710.47 10525.00 8424.51 66.80 66.78 138.72 74.00 1037.17 422.01 615.16 Pass 11431.76 8710.25 10550.00 8433.23 66.50 66.32 138.62 74.70 1050.62 421.02 629.60 Pass 11436.87 8710.08 10575.00 8441.80 66.26 66.02 138.70 75.40 1064.57 420.60 643.97 Pass 11441.89 8709.92 10600.00 8450.25 66.03 65.72 138.76 76.07 1078.88 420.08 658.80 Pass 11450.00 8709.65 10625.00 8458.57 65.66 65.04 138.42 76.70 1093.52 417.98 675.54 Pass 11450.00 8709.65 10650.00 8466.78 65.66 65.31 139.07 77.35 1108.45 419.57 688.87 Pass 11456.46 8709.44 10675.00 8474.88 65.33 64.80 138.89 77.94 1123.67 417.89 705.78 Pass 11461.14 8709.28 10700.00 8482.84 65.09 64.50 138.92 78.53 1139.25 416.97 722.27 Pass 11465.71 8709.13 10725.00 8490.65 64.85 64.19 138.93 79.09 1155.19 416.00 739.18 Pass 11470.15 8708.99 10750.00 8498.33 64.61 63.90 138.94 79.64 1171,48 414.94 756.54 Pass 11475.00 8708.83 10775.00 8505.87 64.34 63.53 138.88 80.16 1188.11 413.56 774.55 Pass 11475.00 8708.83 10800.00 8513.26 64.34 63.79 139.40 80.68 1205.06 414.73 790.33 Pass 11482.92 8708.58 10825.00 8520.51 63.87 63.01 138.92 81.14 1222.25 411.40 810.85 Pass 11487.02 8708.46 10850.00 8527.62 63.62 62.72 138.89 81.61 1239.73 410.13 829.60 Pass 11491.04 8708.34 10875.00 8534.56 63.38 62.43 138.86 82.05 1257.48 408.85 848.63 Pass 11500.00 8708.07 10900.00 8541.30 62.85 61.45 138.19 82.46 1275.53 404.61 870.93 Pass 11500.00 8708.07 10925.00 8547.81 62.85 61.69 138.60 82.88 1293.77 405.53 888.24 Pass 11500.00 8708.07 10950.00 8554.09 62.85 61.93 139.00 83.27 1312.30 406.43 905.87 Pass 11500.00 8708.07 10975.00 8560.17 62.85 62.17 139.38 83.65 1331.07 407.31 923.76 Pass 11510.13 8707.79 11000.00 8566.05 62.17 60.98 138.49 83.97 1349.87 401.90 947.97 Pass 11513.80 8707.69 11025.00 8571.75 61.93 60.69 138.37 84.30 1368.85 400.42 968.44 Pass 11517.45 8707.59 11050.00 8577.25 61.69 60.40 138.25 84.61 1387.95 398.91 989.04 Pass 12050.00 8699.69 11075.00 8582.53 77.56 81.30 158.95 85.20 1402.62 508.46 894.16 Pass Site: PB DS 18 Well: 18-25A Rule Assigned: Major Risk Wellpath: 18-25A V 1 Inter-Site Error: 0.00 ft Reference. Ofisef Semi-MajorAai~ Ctr--Gtr No-Go Allowable NID TVD NID TVD Ref Offset TFO+AZI TF0.HS Casieg/HSflistaece Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ,. 10408.88 8718.36 8825.00 7506.47 59.35 57.99 93.74 13.93 9.625 1248.65 131.39 1117.26 Pass 10417.52 8718.41 8850.00 7526.51 59.28 57.75 93.18 14.41 9.625 1.230.66 133.83 1096.83 Pass 10426.09 8718.47 8875.00 7546.50 59.21 57.51 92.66 14.91 9.625 1212.85 136.37 1076.48 Pass 10434.63 8718.52 8900.00 7566.39 59.10 57.25 92.16 15.44 9.625 1195.29 139.01 1056.28 Pass 10452.43 8718.64 8925.00 7586.11 59.47 57.89 93.54 15.97 9.625 1178.05 142.41 1035.64 Pass 10487.85 8718.95 8950.00 7605.66 60.52 59.97 98.26 16.45 9.625 1160.89 146.81 1014.08 Pass 10525.90 8719.41 8975.00 7625.04 61.32 61.85 103.25 16.87 9.625 1143.71 150.81 992.90 Pass 10566.28 8720.04 9000.00 7644.24 61.74 63.44 108.43 17.22 9.625 1126.44 154.15 972.29 Pass 10608.50 8720.85 9025.00 7663.26 61.74 64.63 113.76 17.48 9.625 1109.03 156.62 952.40 Pass 10635.32 8721.43 9050.00 7682.11 61.76 65.12 115.96 17.74 9.625 1091.48 158.62 932.86 Pass 10646.02 8721.66 9075.00 7700.70 62.11 65.26 115.02 18.09 9.625 1074.26 161.07 913.19 Pass 10656.86 8721,88 9100.00 7719.02 62.42 65.36 114.10 18.47 9.625 1057.51 163.68 893.83 Pass 10667.83 8722,10 9125.00 7737.04 62.71 65.44 113.20 18.88 9.625 1041.25 166.48 874.77 Pass 10678.89 8722,30 9150.00 7754.77 62.98 65.47 112.33 19.33 9.625 1025.50 169.47 856.03 Pass • by BP Alaska Anticollision Report ~~ ~.r ~c ins INTEQ Compaay; BP AmOCO Date: 11/T9/2007 Time: 16:03::38 Page: 11 ..Field: Prudhoe Bay Reterence Site: Reference Well: PB DS 18 18-32 Coordioate(NE) References Vertical ~TVID) Reference: Well: 18-32, True North 59:32.5/3111996 09:46 54.0 Reference Wellpath: Plan 2, 18-32 6 Db: OraGe Site: PB DS 18 Well: 18-25A Rnle Assigned: Major Risk WellpatL: 18-25A V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr' No-Go Allowable MD TVD MD TVD Ret Offset TFO+AZI TFO-HS Casing/HSOistaace Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 10690.03 8722.49 9175.00 7772.20 63.20 65.47 111.48 19.82 9.625 1010.28 172.63 837.64 Pass 10701.21 8722.67 9200.00 7789.32 63.42 65.43 110.67 20.35 9.625 995.61 176.01 819.60 Pass 10712.43 8722.84 9225.00 7806.12 63.56 65.35 109.90 20.92 9.625 981.52 179.56 801.96 Pass 10723.64 8722.99 9250.00 7822.62 63.71 65.23 109.17 21.54 9.625 968.04 183.34 784.69 Pass 10734.80 8723.14 9275.00 7838.86 63.79 65.11 108.49 22.19 9.625 955.09 187.32 767.77 Pass 10745.86 8723.26 9300.00 7854.92 63.86 64.96 107.86 22.89 9.625 942.65 191.50 751.15 Pass 10756.81 8723.38 9325.00 7870.77 63.88 64.77 107.29 23.64 9.625 930.74 195.85 734.89 Pass 10767.63 8723.48 9350.00 7886.43 63.88 64.55 106.79 24.43 9.625 919.38 200.38 719.00 Pass 10778.31 8723.57 9375.00 7901.89 63.85 64.30 106.34 25.26 9.625 908.60 205.07 703.52 Pass 10788.84 8723.64 9400.00 7917.14 63.77 64.02 105.96 26.14 9.625 898.42 209.90 688.51 Pass 10799.20 8723.70 9425.00 7832.19 63.70 63.72 105.64 27.06 9.625 888.86 214.90 673.97 Pass 10809.37 8723.75 9450.00 7947.05 63.56 63.41 105.39 28.03 9.625 879.94 219.98 659.95 Pass 10819.32 8723.79 9475.00 7961.80 63.42 63.07 105.21 29.04 9.625 871.59 225.21 646.38 Pass 10829.04 8723.82 9500.00 7976.45 63.25 62.72 105.09 30.10 9.625 863.83 230.53 633.30 Pass 10838.53 8723.83 9525.00 7991.00 63.06 62.36 105.05 31.19 9.625 856.69 235.90 620.79 Pass 10847.78 8723.84 9550.00 8005.44 62.88 61.98 105.08 32.33 9.625 850.19 241.35 608.83 Pass 10856.90 8723.84 9575.00 8019.78 62.63 61.58 105.16 33.50 9.625 844.35 246.83 597.52 Pass 10865.80 8723.82 9600.00 8034.01 62.38 61.18 105.31 34.71 9.625 839.19 252.31 586.87 Pass 10875.00 8723.79 9625.00 8048.13 62.13 60.72 105.45 35.96 9.625 834.73 257.73 577.00 Pass 10882.85 8723.76 9650.00 8062.12 61.86 60.35 105.79 37.23 9.625 831.02 263.21 567.81 Pass 10891.02 8723.72 9675.00 8075.95 61.58 59.93 106.11 38.53 9.625 828.10 268.56 559.54 Pass 10900.00 8723.66 9700.00 8089.62 61.28 59.42 106.36 39.86 9.625 825.99 273.62 552.37 Pass 10906.65 8723.61 9725.00 8103.14 61.01 59.09 106.91 41.20 9.625 824.70 278.92 545.78 Pass 10914.12 8723.54 9750.00 8116.50 60.70 58.66 107.37 42.56 9.625 824.23 283.87 540.37 Pass 10921.36 8723.47 9775.00 8129.70 60.41 58.24 107.88 43.94 9.625 824.60 288.66 535.94 Pass 10928.38 8723.39 9800.00 8142.74 60.10 57.83 108.42 45.32 9.625 825.82 293.25 532.57 Pass 10935.22 8723.31 9825.00 8155.52 59.78 57.42 108.98 46.70 9.625 827.94 297.60 530.34 Pass 10941.97 8723.23 9850.00 8167.77 59.46 57.01 109.54 48.06 9.625 831.16 301.66 529.50 Pass 10950.00 8723.11 9875.00 8179.48 59.09 56.45 109.91 49.40 9.625 835.47 304.97 530.50 Pass 10955.22 8723.04 9900.00 8190.63 58.81 56.17 110.60 50.71 9.625 840.84 308.71 532.14 Pass 10961.70 8722.93 9925.00 8201.22 58.46 55.73 111.10 51.99 9.625 847.26 311.67 535.59 Pass 10968.09 8722.83 9950.00 8211.24 58.12 55.29 111.57 53.23 9.625 854.69 314.30 540.39 Pass 11281.50 8714.94 9975.00 8220.68 69.82 72.35 136.97 55.02 9.625 862.43 386.88 475.55 Pass 11289.92 8714.69 10000.00 8229.55 69.81 72.18 136.82 55.88 9.625 865.34 390.21 475.13 Pass 11300.00 8714.39 10025.00 8237.89 69.80 71.89 136.46 56.72 9.625 869.07 393.06 476.01 Pass 11306.47 8714.20 10050.00 8246.15 69.74 71.80 136.54 57.58 9.625 873.49 396.21 477.28 Pass 11314.46 8713.96 10075.00 8254.42 69.66 71.60 136.44 58.45 9.625 878.59 398.98 479.61 Pass 11325.00 8713.64 10100.00 8262.68 69.57 71.1 S 136.04 59.31 9.625 884.35 401.09 483.27 Pass 11329.85 8713.49 10125.00 8270.97 69.49 71.14 136.34 60.19 7.000 890.71 403.95 486.76 Pass 11337.28 8713.26 f 0150.00 8279.37 69.37 70.89 136.33 61.07 7.000 897.50 406.19 491.31 Pass 11344.53 8713.04 10175.00 8287.90 69.25 70.64 136.34 61.96 7.000 904.69 408.30 496.39 Pass 11350.00 8712.87 10200.00 8296.55 69.15 70.50 136.57 62.84 7.000 912.29 410.68 501.60 Pass 11358.56 8712.60 10225.00 8305.28 68.95 70.09 136.42 63.72 7.000 920.30 411.94 508.36 Pass 11365.34 8712.39 10250.00 8314.04 68.79 69.81 136.48 64.59 7.000 928.75 413.49 515.27 Pass 11375.00 8712.08 10275.00 8322.83 68.55 69.24 136.17 65.44 7.000 937.67 413.98 523.69 Pass 11375.00 8712.08 10300.00 8331.66 68.55 69.54 137.05 66.32 7.000 947.00 417.20 529.80 Pass 11384.80 8711.77 10325.00 8340.55 68.25 68.92 136.71. 67.16 7.000 956.69 417.07 539.63 Pass 11391.01 8711.57 10350.00 8349.50 68.05 68.62 136.80 67.99 7.000 966.78 417.93 548.85 Pass 11400.00 8711.28 10375.00 8358.52 67.77 68.02 136.54 68.81 7.000 977.24 417.61 559.62 Pass 11400.00 8711.28 10400.00 8367.59 67.77 68.31 137.38 69.65 7.000 988.05 420.35 567.70 Pass 11408.83 8711.00 10425.00 8376.68 67.43 67.70 137.11 70.44 7.000 999.25 419.57 579.68 Pass ~P BP Alaska Anticollision Report mar ~s 1NTEQ Compaay; BP Amoco Date:. 11/19/2007 Time: 16:03:38 Page: 12 Field: Prudhoe Bay Reference Site: PB DS 18 Co-ordiaate(NE}Reference; WeN: 18-32, True North Reference Well: 18-32 Verticnt (TVD) Reference: 59:32 5!31/1996 09: 46 54.0 Referenee Wellpath: Plan 2, 18-32 8 Db: OraCie Site: PB DS 18 Well: 18-25A Rnle Assigned: Major Risk Wellpath: 18-25A V1 Inter-Site Error: 0.00 ft ..Reference Offset Semi-MajorAzi~ Ctr-Gtr No-Go Allowable MD TVD' MD TVD Ref Offset. TFO+AZI TFO-HS. Casieg/HStAstanee Area Deviation Waroiag ft ft ft ft ft ft deg deg in ft ft ft 11414.52 8710.81 10450.00 8385.76 67.21 67.40 137.22 71.23 7.000 1010.86 419.82 591.03 Pass 11425.00 8710.47 10475.00 8394.84 66.80 66.56 136.71 71.99 7.000 1022.89 417.94 604.95 Pass 11425.00 8710.47 10500.00 8403.87 66.80 66.84 137.49 72.77 7.000 1035.28 420.20 615.08 Pass 11430.81 8710.28 10525.00 8412.76 66.54 66.48 137.53 73.50 7.000 1048.24 419.79 628.45 Pass 11435.98 8710.11 10550.00 8421.48 66.30 66.18 137.62 74.22 7.000 1061.72 419.51 642.22 Pass 11441.02 8709.95 10575.00 8430.05 66.07 65.88 137.71 74.91 7.000 1075.70 419.13 656.57 Pass 11450.00 8709.65 10600.00 8438.50 65.66 65.10 137.29 75.56 7.000 1090.06 416.78 673.28 Pass 11450.00 8709.65 10625.00 8446.83 65.66 65.37 137.96 76.23 7.000 1104.69 418.49 686.21 Pass 11455.62 8709.47 10650.00 8455.04 65.37 64.96 137.91 76.86 7.000 1119.65 417.34 702.31 Pass 11460.33 8709.31 10675.00 8463.13 65.13 64.65 137.95 77.46 7.000 1134.90 416.53 718.37 Pass 11465.00 8709.16 10700.00 8471.09 64.89 64.34 137.97 .78.05 7.000 1150.50 415.63 734.88 Pass 11469.41 8709.01 10725.00 8478.90 64.65 64.05 138.01 78.62 7.000 1166.47 414.68 751.78 Pass 11473.78 8708.87 10750.00 8486.58 64.41 63.75 138.03 79.16 7.000 1182.78 413.66 769.12 Pass 11475.00 8708.83 10775.00 8494.12 64.34 63.85 138.42 79.70 7.000 1199.45 414.25 785.19 Pass 11482.25 8708.60 10800.00 8501.51 63.91 63.16 138.05 80.19 7.000 1216.39 411.39 804.99 Pass 11486.36 8708.48 10825.00 8508.76 63.66 62.87 138.04 80.68 7.000 1233.62 410.19 823.42 Pass 11490.40 8708.36 10850.00 8515.87 63.42 62.57 138.02 81.15 7.000 1251.12 408.97 842.15 Pass 11500.00 8708.07 10875.00 8522.81 62.85 61.51 137.30 81.57 7.000 1268.94 404.43 864.51 Pass 11500.00 8708.07 10900.00 8529.55 62.85 61.75 137.74 82.01 7.000 1286.93 405.41 881.52 Pass 11500.00 8708.07 10925.00 8536.06 62.85 61.99 138.16 82.43 7.000 1305.23 406.36 898.87 Pass 11500,00 8708.07 10950.00 8542.35 62.85 62.23 138.56 82.83 7.000 1323.82 407.28 916.54 Pass 11509.50 8707.80 10975.00 8548.42 62.22 61.13 137.77 83.18 7.000 1342.52 402.31 940.21 Pass 11513.16 8707.70 11000.00 8554.31 61.97 60.85 137.68 83.53 7.000 1361.41 400.89 960.52 Pass 11516.78 8707.61 11025.00 8560.00 61.73 60.56 137.58 83.86 7.000 1380.41 399.43 980.98 Pass 12050.00 8699.69 11050.00 8565.50 77.56 81.34 158.22 84.47 7.000 1396.50 508.29 888.21 Pass Site: PB DS 18 Well: 18-25AP B1 Rule Assigned: Major Risk Wellpath: 18-25AP 61 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go ' Allowable MD TVD MD TVD Ref ' Offset TFO+AZI TF0.HS Casiog/HSIHstance Area Deviation Warning ft $ ft ft ft ft deg. deg in ft ft ft 10408.88 8718.36 8825.00 7506.47 59.35 57.99 93.74 13.93 1248.65 131.13 1117.53 Pass 10417.52 8718.41 8850.00 7526.51 59.28 57.75 93.18 14.41 1230.66 133.57 1097.09 Pass 10426.09 8718.47 8875.00 7546.50 59.21 57.51 92.66 14.91 1212.85 136.11 1076.74 Pass 10434.63 8718.52 8900.00 7566.39 59.10 57.25 92.16 15.44 1195.29 138.74 1056.55 Pass 10452.43 8718.64 8925.00 7586.11 59.47 57.89 93.54 15.97 1178.05 142.14 1035.90 Pass 10487.85 8718.95 8950.00 7605.66 60.52 59.97 98.26 16.45 1160.89 146.54 1014.35 Pass 10525.90 8719.41 8975.00 7625.04 61.32 61.85 103.25 16.87 1143.71 150.55 993.17 Pass 10566.28 8720.04 9000.00 7644.24 61.74 63.44 108.43 17.22 1126.44 153.89 972.56 Pass 10608.50 8720.85 9025.00 7663.26 61.74 64.63 113.76 17.48 1109.03 156.36 952.67 Pass 10635.32 8721.43 9050.00 7682.11 61.76 65.12 115.96 17.74 1091.48 158.35 933.12 Pass 10646.02 8721.66 9075.00 7700.70 62.11 65.26 115.02 18.09 1074.26 160.80 913.46 Pass 10656.86 8721.88 9100.00 7719.02 62.42 65.36 114.10 18.47 1057.51 163.42 894.10 Pass 10667.83 8722.10 9125.00 7737.04 62.71 65.44 113.20 18.88 1041.25 166.21 875.04 Pass 10678.89 8722.30 9150.00 7754.77 62.98 65.47 112.33 19.33 1025.50 169.20 856.30 Pass 10690.03 8722.49 9175.00 7772.20 63.20 65.47 111.48 19.82 1010.28 172.37 837.91 Pass 10701.21 8722.67 9200.00 7789.32 63.42 65.43 110.67 20.35 995.61 175.74 819.86 Pass 10712.43 8722.84 9225.00 7806.12 63.56 65.35 109.90 20.92 981.52 179.30 802.23 Pass 10723.64 8722.99 9250.00 7822.62 63.71 65.23 109.17 21.54 968.04 183.07 784.96 Pass 10734.80 8723.14 9275.00 7838.86 63.79 65.11 108.49 22.19 955.09 187.05 768.04 Pass 10745.86 8723.26 9300.00 7854.92 63.86 64.96 107.86 22.89 942.65 191.23 751.42 Pass by BP Alaska Anticollision Report ~~~ Nis tNTEQ Company: BP Amoco Date: 11/19/2007 Time: 16:03`38 Page; 13 Fiehi: Prudhoe Bay ; Reference Site: PB bS' 18 Co-ordinate(NE) Reference: WeN: 18-32, True North Reference Well:. 1 8-32 Vertical (TVD} Reference: 59 c 32 5!3't/1996 09:46 54.0 Reference Wellpath: PIan2; 1&326 Db: Oracle Site: PB DS 18 Well: 18-25AP61 Rule Assigned: Major Risk Wellpath: 18-25AP61 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Azis Ctr-Ctr No-Go Allowabh: MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HS.listanee Area Deviation Waroiag ft ft ~ ft ft ft deg deg in ft ft ft 10756.81 8723.38 9325.00 7870.77 63.88 64.77 107.29 23.64 930.74 195.58 735,16 Pass 10767.63 8723.48 9350.00 7886.43 63.88 64.55 106.79 24.43 919.38 200.11 719.27 Pass 10778.31 8723.57 9375.00 7901.89 63.85 64.30 106.34 25.26 908.60 204.81 703.79 Pass 10788.84 8723.64 9400.00 7917.14 63.77 64.02 105.96 26.14 898.42 209.63 688.78 Pass 10799.20 8723.70 9425.00 7932.19 63.70 63.72 105.64 27.06 888.86 214.63 674,23 Pass 10809.37 8723.75 9450.00 7947.05 63.56 63.41 105.39 28.03 879.94 219.71 660.22 Pass 10819.32 8723.79 9475.00 7961.80 63.42 63.07 105.21 29.04 871.59 224.94 646.64 Pass 10829.04 8723.82 9500.00 7976.45 63.25 62.72 105.09 30.10 863.83 230.26 633.57 Pass 10838.53 8723.83 9525.00 7991.00 63.06 62.36 105.05 31.19 856.69 235.63 621.05 Pass 10847.78 8723.84 9550.00 8005.44 62.86 61.98 105.08 32.33 850.19 241.09 609.10 Pass 10856.90 8723.84 9575.00 8019.78 62,63 61.58 105.16 33.50 844.35 246.56 597.79 Pass 10865.80 8723.82 9600.00 8034.01 62,38 61.18 105.31 34.71 839.19 252.05 587.14 Pass 10875.00 8723.79 9625.00 8048.13 62,13 60.72 105.45 35.96 834.73 257.46 577,27 Pass 10882.85 8723.76 9650.00 8062.12 61.86 60.35 105.79 37.23 831.02 262.95 568.07 Pass 10891.02 8723.72 9675.00 8075.95 61.58 59.93 106.11 38.53 828.10 268.29 559.81 Pass 10900.00 8723.66 9700.00 8089.62 61.28 59.42 106.36 39.86 825.99 273.35 552.64 Pass 10906.65 8723.61 9725.00 8103.14 61.01 59.09 106.91 41.20 824.70 278.65 546.05 Pass 10914.12 8723.54 9750.00 8116.50 60.70 58.66 107.37 42.56 824.23 283.60 540.64 Pass 10921.36 8723.47 9775.00 8129.70 60,41 58.24 107.88 43.94 824.60 288.39 536.21 Pass 10928.38 8723.39 9800.00 8142.74 60.10 57.83 108.42 45.32 825.82 292.98 532.84 Pass 10935.22 8723.31 9825.00 8155.52 59.78 57.42 108.98 46.70 827.94 297.34 530.61 Pass 10941.97 8723.23 9850.00 8167.77 59.46 57.01 109.54 48.06 831.16 301.39 529.77 Pass 10950.00 8723.11 9875.00 8179.48 59.09 56.45 109.91 49.40 835.47 304.70 530.77 Pass 10955.22 8723.04 9900.00 8190.63 58.81 56.17 110.60 50.71 840.84 308.44 532.40 Pass 10961.70 8722.93 9925.00 8201.22 58.46 55.73 111.10 51.99 847.26 311.41 535.85 Pass 10968.09 8722.83 9950.00 8211.24 58.12 55.29 111.57 53.23 854.69 314.03 540.66 Pass 11281.50 8714.94 9975.00 8220.68 69.82 72.35 136.97 55.02 862.43 386.61 475.82 Pass 11289.92 8714.69 10000.00 8229.55 69.81 72.18 136.82 55.88 865.34 389.94 475.40 Pass 11300.00 8714.39 10025.00 8237.89 69.80 71.89 136.46 56.72 869.07 392.79 476.28 Pass 11306.47 8714.20 10050.00 8246.15 69.74 71.80 136.54 57.58 873.49 395.95 477.55 Pass 11314.46 8713.96 10075.00 8254.42 69.66 71.60 136.44 58.45 878.59 398.71 479.88 Pass 11325.00 8713.64 10100.00 8262.68 69.57 71.18 136.04 59.31 884.35 400.82 483.53 Pass 11329.85 8713.49 10125.00 8270.97 69.49 71.14 136.34 60.19 890.71 403.79 486.92 Pass 11337.28 8713.26 10150.00 8279.37 69.37 70.89 136.33 61.07 897.50 406.03 491.47 Pass 11344.53 8713.04 10175.00 8287.90 69.25 70.64 136.34 61.96 904.69 408.14 496.55 Pass 11350.00 8712.87 10200.00 8296.55 69.15 70.50 136.57 62.84 912.29 410.53 501.76 Pass 11358.56 8712.60 10225.00 8305.28 &8.95 70.09 136.42 63.72 920.30 411.78 508.51 Pass 11365.34 8712.39 10250.00 8314.04 68.79 69.81 136.48 64.59 928.75 413.33 515.43 Pass 11375.00 8712.08 10275.00 8322.83 68.55 69.24 136.17 65.44 937.67 413.82 523.85 Pass 11375.00 8712.08 10300.00 8331.66 68.55 69.54 137.05 66.32 947.00 417.04 529.95 Pass 11384.80 8711.77 10325.00 8340.55 68.25 68.92 136.71 67.16 956.69 416.91 539.78 Pass 11391.01 8711.57 10350.00 8349.50 68.05 68.62 136.80 67.99 966.78 417.77 549.01 Pass 11400.00 8711.28 10375.00 8358.52 67.77 68.02 136.54 68.81 977.24 417.46 559.78 Pass 11400.00 8711.28 10400.00 8367.59 67.77 68.31 137.38 69.65 988.05 420.19 567.86 Pass 11408.83 8711.00 10425.00 8376.68 67.43 67.70 137.11 70.44 999.25 419.41 578.84 Pass 11414.52 8710.81 10450.00 8385.76 67.21 67.40 137.22 71.23 1010.86 419.67 591.19 Pass 11425.00 8710.47 10475.00 8394.84 66.80 66.56 136.71 71.99 1022.89 417.79 605.11 Pass 11425.00 8710.47 10500.00 8403.87 66.80 66.84 137.49 72.77 1035.28 420.04 615.24 Pass 11430.81 8710.28 10525.00 8412.76 66.54 66.48 137.53 73.50 1048.24 .419.63 628.61 Pass 11435.98 8710.11 10550.00 8421.48 66.30 66.18 137.62 74,22 1061.72 419.35 642.37 Pass • by BP Alaska Anticollision Report • ~.r mills INTEQ Company: BP Amoco Date: 11/19/2007 Time: 16:03:3$ Page: 14 Field: Prudhoe Bay Reference Site: PB OS 18 Go-ord~ate(NE) Refereece: Well: 18-32, True: North `Reference Well: 18-32 Vertical (TVD) Reference: 59:32 5/31/1996 09:46 54.0 Referenee Wellpath: Plan 2, 18-32 6.. Db: OraGe Site: PB DS 18 Well: 18-25APB1 Rule Assigned: Major Risk Wellpath: 18-25AP61 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aaiv Ctr•Ctr No-Go AIMw-able MD TVD MD TVI) Ref Offset TFO+AZI TFO-HS Casing/H~istaoce Ares'' Deviation WaroinE R ft ft ft ft ft' deg deg in ft ft ft 11441.02 8709.95 10575.00 8430.05 66.07 65.88 f 37.71 74.91 1075.70 418.97 656.73 Pass 11450.00 8709.65 10600.00 8438.50 65.66 65.10 137.29 75.56 1090.06 416.62 673.44 Pass 11450.00 8709.65 10625.00 8446.83 65.66 65.37 137.96 76.23 1104.69 418.33 686.37 Pass 11455.62 8709.47 10650.00 8455.04 65.37 64.96 137.91 76.86 1119.65 417.18 702.47 Pass 11460.33 8709.31 10675.00 8463.13 65.13 64.65 137.95 77.46 1134.90 416.37 718.53 Pass 11465.00 8709.f6 10700.00 8471.09 64.89 64.34 137,97 78.05 1150.50 415.47 735.04 Pass 11469.41 8709.01 10725.00 8478.90 64.65 64.05 138.01 78.62 1166.47 414.52 751.94 Pass 11473.78 8708.87 10750.00 8486.58 64.41 63.75 138.03 79.16 1182.78 413.50 769.28 Pass 11475.00 8708.83 10775.00 8494.12 64.34 63.85 138.42 79.70 1199.45 414.10 785.35 Pass 11482.25 8708.60 10800.00 8501.51 63.91 63.16 138.05 80.19 1216.39 411.23 805.15 Pass 11486.36 8708.48 10825.00 8508.76 63.66 62.87 138.04 80.68 1233.62 410.04 823.58 Pass 11490.40 8708.36 10850.00 8515.87 63.42 62.57 138.02 81.15 1251.12 408.81 842.31 Pass 11500.00 8708.07 10875.00 8522.81 62.85 61.51 137.30 81.57 1268.94 404.27 864.66 Pass 11500.00 8708.07 10900.00 8529.55 62.85 61.75 137.74 82.01 1286.93 405.25 881.68 Pass 11500.00 8708.07 10925.00 8536.06 62.85 61.99 138.16 82.43 1305.23 406.20 899.03 Pass 11500.00 8708.07 10950.00 8542.35 62.85 62.23 138.56 82.83 1323.82 407.12 916.70 Pass 11509.50 8707.80 10975.00 8548.42 62.22 61.13 137.77 83.18 1342.52 402.15 940.37 Pass 11513.16 8707.70 11000.00 8554.31 61.97 60.85 137.68 83.53 1361.41 400.73 960.68 Pass 11516.78 8707.61 11025.00 8560.00 61.73 60.56 137.58 83.86 1380.41 399.27 981.14 Pass 12050.00 8699.69 11050.00 8565.50 77.56 81.34 158.22 84.47 1396.50 508.13 888.37 Pass Site: PB DS 1 8 Well: 18-28 Rule Assigned: Major Risk Wellpath: 18-28 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H~istance Area Deviation. Warning ft ft ft ft ft ft deg deg in ft ft- ft 9182.59 8194.19 9250.00 7991.10 50.36 57.77 142.33 67.18 7.625 857.72 295.08 562.63 Pass 9205.53 8212.36 9275.00 8011.59 50.50 57.95 142.56 67.58 7.625 861.92 296.73 565.18 Pass 9228.41 8230.47 9300.00 8032.03 50.62 58.14 142.78 67.98 7.625 866.37 298.30 568.07 Pass 9318.65 8298.82 9325.00 8052.41 51.43 59.13 144.69 63.38 7.625 868.50 305.67 563.82 Pass 9334.88 8311.67 9350.00 8072.66 51.56 59.66 145.22 62.33 7.625 872.66 306.75 565.91 Pass 10189.65 8716.75 9375.00 8092.76 54.86 60.19 149.87 43.76 7.625 863.94 272.70 591.23 Pass 10196.36 8716.81 9400.00 8112.73 55.18 60.51 149.91 44.60 7.625 848.45 277.68 570.77 Pass 10203.15 8716.86 9425.00 8132.61 55.48 60.83 149.98 45.49 7.625 833.37 282.76 550.61 Pass 10209.94 8716.91 9450.00 8152.51 55.77 61.13 150.09 46.41 7.625 818.61 287.92 530.68 Pass 10216.73 8716.97 9475.00 8f72.45 56.05 61.42 150.25 47.38 7.625 804.19 293.22 510.96 Pass 10225.00 8717.03 9500.00 8192.43 56.39 61.71 150.27 48.40 7.625 790.13 298.83 491.30 Pass 10230.28 8717.07 9525.00 8212.43 56.58 61.96 150.70 49.46 5.500 776.44 304.03 472.41 Pass 10237.05 8717.12 9550.00 8232.44 56.82 62.22 151.00 50.57 5.500 763.15 309.57 453.57 Pass 10243.85 8717.18 9575.00 8252.43 57.07 62.46 151.33 51.72 5.500 750.24 315.19 435.05 Pass 10250.00 8717.22 9600.00 8272.40 57.29 62.69 15f.79 52.92 5.500 737.76 320.81 416.95 Pass 10257.48 8717.28 9625.00 8292.35 57.51 62.91 152.13 54.16 5.500 725.71 326.50 399.21 Pass 10264.38 8717.33 9650.00 8312.16 57.72 63.13 152.58 55.43 5.500 714.17 332.16 382.01 Pass 10271.38 8717.39 9675.00 8331.81 57.92 63.33 153.05 56.74 5.500 703.15 337.80 365.35 Pass 10278.48 8717.44 9700.00 8351.29 58.11 63.53 153.54 58.09 5.500 692.68 343.34 349.34 Pass 10285.66 8717.49 9725.00 8370.60 58.28 63.71 154.06 59.46 5.500 682.80 348.78 334.02 Pass 10292.96 8717.55 9750.00 8389.70 58.45 63.89 154.59 60.87 5.500 673.57 354.16 319.42 Pass 10300.00 8717.60 9775.00 8408.60 58.62 64.06 155.19 62.31 5.500 665.04 359.41 305.63 Pass 10307.85 8717.66 9800.00 8427.29 58.76 64.20 155.71 63.78 5.500 657.21 364.41 292.80 Pass 10315.43 8717.71 9825.00 8445.79 58.89 64.34 156.30 65.27 5.500. 650.09 369.27 280.82 Pass 10325.00 8717.78 9850.00 8464.15 59.06 64.43 156.67 66.80 5.500 643.69 373.96 269.73 Pass • by BP Alaska Anticollision Report ~i~r 1NTEQ Company: BP Amoco Date: 11/19/2007 Time: 16:03:38 Page: 15 Fkhl: Prudhoe Bay Reterenee Site: PB DS 18 Go-ordieate(NE) Reference: Well: t &32, True North Reference We1L 18-32 Vertical (TVD) Reference: 59:32 5/31!1996 09: 46 54.0 Reference Weilpath: Plan 2, 18-32 8 Db: Grade Site: PB DS 1 8 Well: 18-28 Rale Assigned: Major Risk Wellpatb: 18-28 V1 Ioter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Co AOowable MD TVD MD TVD Ret' Offset TFO+AZI TFO-HS Casi®g/HSflistance Area Deviation Warning ft ft ft ft ft _ ft deg deg in ft ft ft 10330.75 8717.82 9875.00 8482.35 59.12 64.58 157.52 68.34 5.500 638.00 378.33 259.67 Pass 10338.49 8717.88 9900.00 8500.41 59.21 64.67 f 58. f 6 69.91 5.500 633.04 382.44 250.60 Pass 10346.26 8717.93 9925.00 8518.36 59.29 64.75 158.82 71.49 5.500 628.78 386.30 242.48 Pass 10354.06 8717.99 9950.00 8536.16 59.35 64.82 159.48 73.10 5.500 625.34 389.81 235.53 Pass 10362.07 8718.04 9975.00 8553.40 59.39 64.87 160.10 74.68 5.500 623.03 392.90 230.12 Pass 10370.33 8718.10 10000.00 8569.78 59.43 64.90 160.65 76.21 5.500 622.34 395.62 226.72 Pass 10378.77 8718.16 10025.00 8585.29 59.45 64.92 161.11 77.69 5.500 623.35 397.91 225.45 Pass 10387.28 8718.22 10050.00 8600.22 59.44 64.93 161.53 79.13 5.500 625.70 399.75 225.96 Pass 10395.77 8718.27 10075.00 8614.89 59.43 64.91 161.92 80.54 5.500 628.94 40f.28 227.66 Pass 10404.23 8718.33 10100.00 8629.29 59.39 64.88 162.28 81.92 5.500 633.12 402.42 230.71 Pass 10412.60 8718.38 10125.00 8643.25 59.32 64.83 162.61 83.25 5.500 638.75 403.17 235.58 Pass 10420.95 8718.43 10150.00 8656.45 59.26 64.76 162.85 84.49 5.500 645.85 403.62 242.23 Pass 10648.42 8721.71 10175.00 8668.57 62.19 69.19 181.97 85.32 5.500 651.32 425.94 225.38 Pass 10657.96 8721.90 10200.00 8679.51 62.45 69.50 181.78 86.28 5.500 653.64 428.15 225.49 Pass 10667.62 8722.09 10225.00 8689.39 62.71 69.78 181.49 87.15 5.500 656.84 430.13 226.71 Pass 10675.00 8722.23 10250.00 8698.11 62.90 70.07 181.36 87.90 5.500 661.03 431.83 229.21 Pass 10687.19 8722.44 10275.00 8705.42 63.15 70.27 180.54 88.54 5.500 666.15 433.30 232.85 Pass 10700.00 8722.65 10300.00 8711.17 63.40 70.41 179.49 89.03 5.500 672.03 434.56 237.47 Pass 10706.89 8722.76 10325.00 8715.44 63.49 70.64 179.02 89.38 5.500 678.85 435.55 243.30 Pass 10716.64 8722.90 10350.00 8718.27 63.62 70.77 178.08 89.61 5.500 686.44 436.34 250.10 Pass 10725.00 8723.01 10375.00 8720.23 63.73 70.90 177.23 89.77 5.500 694.60 437.09 257.51 Pass 10735.77 8723.15 10400.00 8721.59 63.80 70.93 176.05 89.87 5.500 703.49 437.39 266.10 Pass 10745.10 8723.25 10425.00 8722.38 63.86 70.97 174.99 89.93 5.500 712.91 437.68 275.23 Pass 10754.29 8723.35 10450.00 8722.77 63.88 70.98 173.91 89.95 5.500 722.71 437.79 284.92 Pass 10763.31 8723.44 10475.00 8723.36 63.88 70.96 172.87 89.99 5.500 733.04 437.73 295.31 Pass 10775.00 8723.54 10500.00 8724.30 63.87 70.80 171.54 90.06 5.500 744.13 437.21 306.92 - Pass 10780.68 8723.58 10525.00 8725.36 63.83 70.87 170.93 90.14 5.500 755.95 437.31 318.64 Pass 10789.06 8723.64 10550.00 8726.40 63.77 70.80 169.99 90.21 5.500 768.27 436.90 331.37 Pass 10800.00 8723.71 10575.00 8727.31 63.69 70.55 168.75 90.27 5.500 780.91 435.93 344.99 Pass 10805.39 8723.73 10600.00 8728.23 63.62 70.59 168.16 90.32 5.500 793.73 435.79 357.94 Pass 10813.34 8723.77 10625.00 8729.23 63.50 70.45 167.27 90.39 5.500 806.83 435.05 371.78 Pass 10825.00 8723.81 10650.00 8730.27 63.34 70.07 165.94 90.45 5.500 820.36 433.39 386.97 Pass 10825.00 8723.81 10675.00 8731.22 63.34 70.39 165.99 90.51 5.500 834.27 434.35 399.92 Pass 10836.06 8723.83 10700.00 8731.96 63.11 69.98 164.71 90.55 5.500 848.88 432.43 416.45 Pass 10843.08 8723.84 10725.00 8732.16 62.96 69.81 163.87 90.55 5.500 864.39 431.46 432.93 Pass 10850.00 8723.84 10750.00 8731.78 62.82 69.61 163.00 90.52 5.500 880.65 430.43 450.23 Pass 10856.27 8723.84 10775.00 8731.18 62.64 69.43 162.20 90.47 5.500 897.46 429.38 468.08 Pass 10862.50 8723.83 10800.00 8730.98 62.47 69.24 161.44 90.45 5.500 914.78 428.28 486.51 Pass 10868.45 8723.81 10825.00 8731.17 62.31 69.04 160.73 90.45 5.500 932.68 427.19 505.49 Pass 10875.00 8723.79 10850.00 8731.63 62.13 68.78 159.96 90.47 5.500 950.89 425.86 525.04 Pass 10875.00 8723.79 10875.00 8732.20 62.13 69.04 159.99 90.50 5.500 969.44 426.63 542.81 Pass 10885.20 8723.75 10900.00 8732.87 61.78 68.44 158.80 90.53 5.500 988.24 423.78 564.47 Pass 10890.46 8723.72 10925.00 8733.93 61.60 68.24 158.22 90.58 5.500 1007.22 422.61 584.61 Pass 10900.00 8723.66 10950.00 8734.87 61.28 67.63 157.12 90.62 5.500 1026.64 419.79 606.85 Pass 10900.00 8723.66 10975.00 8735.67 61.28 67.87 157.16 90.66 5.500 1046.22 420.50 625.72 Pass 10900.00 8723.66 11000.00 8736.29 61.28 68.11 157.19 90.69 5.500 1066.07 421.21 644.86 Pass 10909.75 8723.58 11025.00 8736.75 60.88 67.42 156.03 90.69 5.500 1086.05 417.96 668.09 Pass 10914.23 8723.54 11050.00 8737.32 60.70 67.22 155.51 90.71 5.500 1106.22 4 f 6.79 689.44 Pass 10918.62 8723.50 11075.00 8738.04 60.52 67.02 155.01 90.74 5.500 1126.49 415.62 710.87 Pass 10925.00 8723.43 11100.00 8738.91 60.26 66.60 154.28 90.77 5.500 1146.94 413.57 733.37 Pass 10925.00 8723.43 11125.00 8739.83 60.26 66.81 154.32 90.81 5.500 1167.60 414.21 753.39 Pass by BP Alaska Anticollision Report • ~.r ~ci~s 1tNTEQ Company: BP Amoco Date: 11/19/2007 Time: 16:03:38 `Page: t6 Field' Pivdhoe$ay Reference Site: PB DS 18 Co-ordiuate(NE) Reference: WeN: 1 &-32, True North Reference Wellc 18-32 Vertical (TVD) Reference: 59:32`5/31/199609:46 54.0 Reference Welipath: Plan 2, 18-32 8 Db: Orade Site: PB DS 18 Well: 18-28 Rule Assigned:. Major Risk Welipath: 18-28 V1 Teter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Gtr-(ar No-Go Allowable MD TVD MD TVD Ref- Offset TFO+AZI TFO-HS Casing/HSDista®ee Area ` Deviation Wareing ft ft ft ft ft ft deg deg `_ in ft ft ft 10925.00 8723.43 11150.00 8740.70 60.26 67.03 154.35 90.84 5.500 1188.53 414.85 773.68 Pass 10934.79 8723.32 11175.00 8741.56 59.80 66.22 153.20 90.86 5.500 1209.52 411.01 798.51 Pass 10938.57 8723.27 11200.00 8742.53 59.62 66.02 152.78 90.90 5.500 1230.59 409.87 820.72 Pass 10942.30 8723.22 11225.00 8743.55 59.45 65.83 152.37 90.93 5.500 1251.67 408.73 842.94 Pass 11317.74 8713.86 11250.00 8744.63 69.63 78.34 168.99 91.39 5.500 1268.27 476.80 791.48 Pass 11325.00 8713.64 11275.00 8745.64 69.57 78.10 168.15 91.42 5.500 1285.20 475.88 809.33 Pass 11325.00 8713.64 11300.00 8746.35 69.57 78.39 168.18 91.45 5.500 1302.37 476.72 825.65 Pass 11332.42 8713.41 11325.00 8746.81 69.45 78.11 167.29 91.45 5.500 1319.76 475.51 844.25 Pass 11337.13 8713.27 11350.00 8746.92 69.37 78.02 166.72 91.44 5.500 1337.29 475.00 862.29 Pass 11341.71 8713.13 11375.00 8746.81 69.29 77.93 166.15 91.42 5.500 1355.16 474.48 880.68 Pass 11350.00 8712.87 11400.00 8746.89 69.15 77.52 165.13 91.40 5.500 1373.29 472.81 900.47 Pass 11350.00 8712.87 11425.00 8747.76 69.15 77.79 165.17 91.44 5.500 1391.18 473.61 917.57 Pass Site: PB DS 18 Weil: 18-28P8 1 Rule Assigned: Major Risk Wellpath: 18-28P6 1 V1 Inter-Site Error: 0.00 ft Reference Offset. Semi-Major Axis Ctr-Ctr No-Go Allowable 114D TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistaoce Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft` ft 9182.59 8194.19 9250.00 7991.10 50.36 57.77 142.33 67.18 857.72 294.90 562.82 Pass 9205.53 8212.36 9275.00 8011.59 50.50 57.95 142.56 67.58 861.92 296.55 565.37 Pass 9228.41 8230.47 9300.00 8032.03 50.62 58.14 142.78 67.98 866.37 298.12 568.26 Pass 9318.65 8298.82 9325.00 8052.41 51.43 59.13 144.69 63.38 869.50 305.49 564.01 Pass 9334.88 8311.67 9350.00 8072.66 51.56 59.66 145.22 62.33 872.66 306.57 566.09 Pass 10189.65 8716.75 9375.00 8092.76 54.86 60.19 149.87 43.76 863.94 272.52 591.42 Pass 10196.36 8716.81 9400.00 8112.73 55.18 60.51 149.91 44.60 848.45 277.50 570.95 Pass 10203.15 8716.86 9425.00 8132.61 55.48 60.83 149.98 45.49 833.37 282.57 550.79 Pass 10209.94 8716.91 9450.00 8152.51 55.77 61.13 150.09 46.41 818.61 287.74 530.87 Pass 10216.73 8716.97 9475.00 8172.45 56.05 61.42 150.25 47.38 804.19 293.04 511.15 Pass 10225.00 8717.03 9500.00 8192.43 56.39 61.71 150.27 48.40 790.13 298.64 491.49 Pass 10230.28 8717.07 9525.00 8212.43 56.58 61.96 150.70 49.46 776.44 303.94 472.51 Pass 10237.05 8717.12 9550.00 8232.44 56.82 62.22 151.00 50.57 763.15 309.48 453.67 Pass 10243.85 8717.18 9575.00 8252.43 57.07 62.46 151.33 51.72 750.24 315.10 435.15 Pass 10250.00 8717.22 9600.00 8272.40 57.29 62.69 151.79 52.92 737.76 320.71 417.05 Pass 10257.48 8717.28 9625.00 8292,35 57.51 62.91 152.13 54.16 725.71 326.40 399.31 Pass 10264.38 8717.33 9650.00 8312.16 57.72 63.13 152.58 55.43 714.17 332.06 382.10 Pass 10271.38 8717.39 9675.00 8331.81 57.92 63.33 153.05 56.74 703.15 337.70 365.45 Pass 10278.48 8717.44 9700.00 8351.29 58.11 63.53 153.54 58.09 692.68 343.24 349.44 Pass 10285.66 8717.49 9725.00 8370.60 58.28 63.71 154.06 59.46 682.80 348.68 334.11 Pass 10292.96 8717.55 9750.00 8389.70 58.45 63.89 154.59 60.87 673.57 354.06 319.51 Pass 10300.00 8717.60 9775.00 8408.60 58.62 64.06 155.19 62.31 665.04 359.31 305.73 Pass 10307.85 8717.66 9800.00 8427.29 58.76 64.20 155.71 63.78 657.21 364.31 292.89 Pass 10315.43 8717.71 9825.00 8445.79 58.89 64.34 156.30 65.27 650.09 369.18 280.92 Pass 10325.00 8717.78 9850.00 8464.15 59.06 64.43 156.67 66.80 643.69 373.86 269.83 Pass 10330.75 8717.82 9875.00 8482.35 59.12 64.58 157.52 68.34 638.00 378.23 259.76 Pass 10338.49 8717.88 9900.00 8500.41 59.21 64.67 158.16 69.91 633.04 382.34 250.70 Pass 10346.26 8717.93 9925.00 8518.36 59.29 64.75 158.82 71.49 628.78 386.20 242.58 Pass 10354.06 8717.99 9950.00 8536.16 59.35 64.82 159.48 73.10 625.34 389.71 235.62 Pass 10362.07 8718.04 9975.00 8553.40 59.39 64.87 160.10 74.68 623.03 392.81 230.22 Pass 10370.33 8718.10 10000.00 8569.78 59.43 64.90 160.65 76.21 622.34 395.53 226.81 Pass 10378.77 8718.16 10025.00 8585.29 59.45 64.92 161.11 77.69 623.35 397.81 225.54 Pass 10387.28 8718.22 10050.00 8600.22 59.44 64.93 161.53 79.13 625.70 399.65 226.05 Pass by BP Alaska Anticollision Report U ~.r Kilns 1NTEQ .Company; BP Amoco Date: 11/19/2007 Time: 16:03:38 Page: 17 -F~Id: Prudhoe Bay Reference Site: PB DS 18 Go-ordinate(NE) Reference: Well: 18-32, True North Rekrence Well: 18-32 Vertical (TVD) Reference: 5$ : 37 5/31/1 996 09`46 54.0 Reference Wel)pat6: Plan 2, 18-326 Db: Orade Site: PB DS 1 8 WeII: 18-28PB1 Rule Assigned: Major Risk Wellpath: 18-28P61 V1 Inter-Site Error: 0.00 ft Itetereace Offset Semi-Major Aaie Ctr-Ctr No-Go ` Allowable 1VID TVD NID T~'D Ref Offset TFO+AZI TFO-HS Casiog/HSDistaace Area Ikwiation Warning ft ft ft ft ft ft deg deg in ft ft ft 10395.77 8718.27 10075.00 8614.89 59.43 64.91 161.92 80.54 628.94 401.18 227.76 Pass 10404.23 8718.33 10100.00 8629.29 59.39 64.88 162.28 81.92 633.12 402.32 230.80 Pass 10412.60 8718.38 10125.00 8643.25 59.32 64.83 162.61 83.25 638.75 403.07 235.68 Pass 10420.95 8718.43 10150.00 8656.45 59.26 64.76 162.85 84.49 645.85 403.53 242.32 Pass 10648.42 8721.71 10175.00 8668.57 62.19 69.19 181.97 85.32 651.32 425.85 225.47 Pass 10657.90 8721.90 10200.00 8679.64 62.45 69.50 181.81 86.29 654.17 428.05 226.13 Pass 10667.39 8722.09 10225.00 8689.87 62.70 69.78 181.57 87.20 658.48 430.01 228.48 Pass 10675.00 8722.23 10250.00 8899.54 62.90 70.05 18f.50 88.04 664.14 431.69 232.44 Pass 10686.18 8722.43 10275.00 8708.55 63.13 70.25 180.94 88.81 670.83 433.12 237.71 Pass 10695.54 8722.58 10300.00 8716.57 63.31 70.45 180.49 89.49 678.29 434.36 243.93 Pass 10704.91 8722.73 10325.00 8723.47 63.46 70.62 179.94 90.06 686.37 435.35 251.02 Pass 10714.23 8722.86 10350.00 8729.13 63.59 70.76 179.28 90.52 695.16 436.13 259.03 Pass 10725.00 8723.01 10375.00 8734.16 63.73 70.82 178.38 90.91 704.48 436.72 267.76 Pass 10732.63 8723.11 10400.00 8738.31 63.78 70.95 177.77 91.22 714.04 437.21 276.83 Pass 10741.75 8723.22 10425.00 8741.51 63.83 71.01 176.91 91.45 723.85 437.51 286.34 Pass 10750.00 8723.31 10450.00 8744.19 63.89 71.06 176.10 91.63 734.12 437.80 296.32. Pass 10759.56 8723.40 10475.00 8746.44 63.88 71.04 175.10 91.77 744.87 437.68 307.19 Pass 10768.22 8723.48 10500.00 8748.34 63.88 71.02 174.17 91.88 756.14 437.57 318.57 Pass 10775.00 8723.54 10525.00 8750.54 63.87 71.05 173.49 92.01 767.90 437.64 330.27 Pass 10784.99 8723.61 10550.00 8753.24 63.80 70.91 172.45 92.18 780.08 436.95 343.13 Pass 10793.12 8723.67 10575.00 8755.94 63.74 70.83 171.64 92.33 792.63 436.48 356.16 Pass 10800.00 8723.71 10596.30 8758.24 63.69 70.75 170.94 92.46 803.62 436.02 367.60 Pass Site: PB DS 1 8 Well: 18-32 Rule Assigned: Major Risk Wellpath: 18-32 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aait Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TBO-HS Casing/HSUistaoce Area Deviation Warning_ - ft ft ft ft ft ft deg deg in ft ft ft 9200.00 8207.98 9200.00 8207.98 50.48 49.49 75.02 0.00 4.500 0.00 228.48 -228.48 FAIL 9225.00 8227.77 9225.00 8227.77 50.60 49.70 74.83 0.00 4.500 0.00 229.20 -229.20 FAIL 9250.00 8247.52 9250.00 8247.56 50.72 49.90 74.71 0.00 4.500 0.08 229.62 -229.55 FAIL 9274.94 8266.60 9275.00 8267.35 50.96 50.21 267.69 190.75 4.500 1.14 111.15 -110.01 FAIL 9299.78 8284.59 9300.00 8287.12 51.25 50.57 278.21 198.50 4.500 3.92 136.48 -132.56 FAIL 9325.01 8303.79 9325.00 8306.88 51.49 50.88 291.56 209.66 4.500 5.77 185.87 -180.10 FAIL 9350.17 8324.23 9350.00 8326.59 51.67 51.14 314.21 229.62 4.500 6.64 269.53 -262.88 FAIL 9374.85 8345.40 9375.00 8346.26 51.78 51.35 345.56 257.53 4.500 8.28 337.54 -329.26 FAIL 9398.70 8366.75 9400.00 8365.87 51.83 51.51 12.29 279.85 4.500 12.48 332.16 -319.68 FAIL 9421.43 8387.79 9425.00 8385.43 51.82 51.65 28.71 290.45 4.500 19.41 298.93 -279.52 FAIL 9442.82 8408.05 9450.00 8404.93 51.74 51.74 38.47 292.05 4.500 28.63 268.88 -240.25 FAIL 9462.73 8427.24 9475.00 8424.35 51.63 51.81 44.56 287.26 4.500 39.85 246.05 -206.20 FAIL 9481.15 8445.18 9500.00 8443.70 51.50 51.87 48.75 277.61 4.500 52.68 229.43 -176.75 FAIL 9497.90 8461.58 9525.00 8462.77 51.34 51.93 51.77 264.83 4.500 67.24 216.72 -149.48 FAIL 9521.00 8484.14 9550.00 8481.23 51.26 52.05 53.08 278.31 4.500 82.89 213.10 -130.22 FAIL 9546.82 8508.94 9575.00 8498.77 51.22 52.19 53.16 289.26 4.500 98.40 216.66 -118.26 FAIL 9574.35 8534.68 9600.00 8515.26 51.20 52.35 52.50 295.73 4.500 113.73 223.30 -109.57 FAIL 9603.44 8560.85 9625.00 8530.44 51.24 52.52 51.36 299.52 4.500 129.02 231.51 -102.50 FAIL 9634.35 8587.19 9650.00 8544.58 51.33 52.71 49.75 301.54 4.500 143.96 241.68 -97.72 FAIL 9667.47 8613.40 9675.00 8558.20 51.49 52.92 47.65 302.29 4.500 157.96 253.76 -95.79 FAIL 9702.33 8638.36 9700.00 8571.59 51.74 53.16 44.99 301.92: 4.500 170.88 267.57 -96.69 FAIL 9737.28 8660.31 9725.00 8584.67 52.05 53.42 41.69 300.48 4.500 183.20 282.70 -99.50 FAIL 9771.34 8678.44 9750.00 8597.53 52.42 53.71 37.94 298.25 4.500 195.14 298.14 -103.00 FAIL by BP Alaska Anticollision Report ~;~r s INTEQ Company; BP Amoco Date: 11/19/2007 Tim e: 16:03:38 Page: 18 Fiehi: Prudhoe Bay Reference Site: ' PB DS 18 Go-ordinate(NE) Reference: WeIY. 18-32, True North Referenee Wetl: 18-32 Vertical (TVD) Reference: 59:32 5/31/1 998 09: 46 54.0 Reference Wellpath: Plan 2, 18-326. Db: Oracle Site: PB DS 1 8 Well: 18-32 Rule Assigned: Major Risk Wellpath: 18-32 V1 Irtter-Site Error: 0.00 ft Reference Offset Semi-Major Adis Ctr--Gtr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/BSUistance Area Deviation Warning ft ft ft tt ft ft deg deg in ft ft ft 9804.12 8692.59 9775.00 8610.26 52.82 54.02 33.92 295.51 4.500 206.70 312.83 -106.13 FAIL 9835.32 8702.90 9800.00 8622.88 53.24 54.35 29.76 292.47 4.500 218.02 326.17 -108.15 FAIL 9864.45 8709.63 9825.00 8635.34 53.64 54.70 25.53 289.23 4.500 229.39 337.79 -108.40 FAIL 9890.42 8713.20 9850.00 8647.70 54.01 55.03 21.27 285.81 4.500 241.49 347.48 -105.99 FAIL 9913.29 8714.44 9875.00 8659.32 54.34 55.35 17.21 282.48 4.500 255.12 354.97 -99.84 FAIL 9923.43 8714.53 9900.00 8669.82 54.32 55.35 15.20 279.51 4.500 270.63 358.07 -87.44 FAIL 9932.10 8714.61 9925.00 8678.90 54.24 55.31 13.85 277.12 4.500 288.03 359.60 -71.57 FAIL 9940.46 8714.68 9950.00 8686.26 54.17 55.25 13.04 275.32 4.500 306.86 360.24 -53.38 FAIL 9948.34 8714.75 9975.00 8692.10 54.09 55.19 12.65 273.97 4.500 326.84 360.38 -33.54 FAIL 9956.10 8714.82 10000.00 8696.62 53.98 55.10 12.61 273.00 4.500 347.29 360.10 -12.82 FAIL 9963.75 8714.88 10025.00 8700.50 53.87 55.01 12.76 272.24 4.500 367.88 359.64 8.24 Pass 9971.04 8714.95 10050.00 8703.72 53.76 54.91 13.05 271.65 4.500 388.84 359.09 29.74 Pass 9978.03 8715.01 10075.00 8705.81 53.64 54.80 13.52 271.28 4.500 410.14 358.44 51.70 Pass 9984.85 8715.07 10100.00 8707.20 53.50 54.69 14.10 271.04 4.500 431.53 357.69 73.84 Pass 9991.35 8715.12 10125.00 8708.20 53.36 54.57 14.71 270.88 4.500 453.14 356.94 96.20 Pass 9997.58 8715.17 10150.00 8708.97 53.24 54.44 15.33 270.75 4.500 474.89 356.18 118.70 Pass 10003.57 8715.23 10175.00 8709.47 53.09 54.31 15.97 270.66 4.500 496.76 355.37 141.39 Pass 10009.24 8715.27 10200.00 8709.56 52.95 54.18 16.61 270.63 4.500 518.85 354.54 164.31 Pass 10014.69 8715.32 10225.00 8709.56 52.80 54.05 17.25 270.61 4.500 541.06 353.71 187.35 Pass 10019.91 8715.37 10250.00 8709.86 52.67 53.90 17.82 270.56 4.500 563.37 352.87 210.50 Pass 10025.00 8715.41 10275.00 8710.82 52.54 53.74 18.32 270.45 4.500 585.90 351.99 233.91 Pass 10029.37 8715.45 10300.00 8712.21 52.40 53.61 18.70 270.30 4.500 608.64 351.18 257.46 Pass 10033.63 8715.48 10325.00 8713.56 52.26 53.48 19.09 270.17 4.500 631.60 350.37 281.23 Pass 10037.65 8715.52 10350.00 8714.72 52.14 53.36 19.46 270.07 4.500 654.73 349.62 305.11 Pass 10041.71 8715.55 10375.00 8715.32 52.01 53.23 19.90 270.02 4.500 677.75 348.86 328.90 Pass 10045.67 8715.58 10400.00 8715.16 51.89 53.11 20.39 270.03 4.500 700.80 348.12 352.69 Pass 10050.00 8715.62 10425.00 8714.02 51.75 52.95 21.00 270.13 4.500 723.93 347.25 376.68 Pass 10050.00 8715.62 10450.00 8711.90 51.75 53.07 21.16 270.29 4.500 747.01 347.62 399.39 Pass 10056.82 8715.68 10475.00 8709.51 51.50 52.75 22.15 270.46 4.500 770.00 345.89 424.11 Pass 10486.79 8718.94 10500.00 8707.08 60.49 62.30 352.55 270.86 4.500 787.73 401.49 386.24 Pass 10494.23 8719.02 10525.00 8705.15 60.68 62.47 353.57 270.99 4.500 802.82 402.56 400.26 Pass 10500.00 8719.08 10550.00 8704.01 60.83 62.63 354.33 271.06 4.500 818.35 403.48 414.87 Pass 10508.51 8719.18 10575.00 8703.49 60.99 62.74 355.37 271.08 4.500 834.36 404.31 430.05 Pass 10515.40 8719.27 10600.00 8703.19 61.12 62.86 356.20 271.08 4.500 850.55 405.05 445.50 Pass 10525.00 8719.40 10625.00 8703.49 61.31 62.91 357.31 271.04 4.500 867.14 405.76 461.38 Pass 10525.00 8719.40 10650.00 8704.27 61.31 63.11 357.25 270.99 4.500 884.26 406.37 477.89 Pass 10534.70 8719.54 10675.00 8705.16 61.43 63.12 358.34 270.91 4.500 901.83 406.80 495.03 Pass 10540.72 8719.63 10700.00 8706.02 61.51 63.20 359.00 270.85 4.500 919.66 407.27 512.39 Pass 10550.00 8719.77 10725.00 8706.81 61.63 63.19 0.05 270.78 4.500 937.62 407.59 530.03 Pass 10550.00 8719.77 10750.00 8707.52 61.63 63.40 0.00 270.74 4.500 955.75 408.24 547.52 Pass 10558.03 8719.90 10775.00 8707.91 61.68 63.39 0.93 270.71 4.500 974.04 408.37 565.67 Pass 11066.53 8720.70 10800.00 8707.72 61.42 63.28 333.26 270.75 4.500 992.26 407.10 585.17 Pass 11075.00 8720.49 10825.00 8707.31 62.01 63.84 334.29 270.76 4.500 1000.71 410.58 590.13 Pass 11081:69 8720.33 10850.00 8707.19 62.44 64.31 335.08 270.75 4.500 1009.47 413.28 596.18 Pass 11089.15 8720.14 10875.00 8707.37 62.92 64.77 335.94 270.72 4.500 1018.54 416.09 602.45 Pass 11100.00 8719.87 10900.00 8707.72 63.61 65.29 337.22 270.69 4.500 1027.98 419.75 608.22 Pass 11100.00 8719.87 10925.00 8708.13 63.61 65.55 337.16 270.63 4.500 1037.70 420.55 617.15 Pass 11110.95 8719.60 10950.00 8708.50 64.24 66.05 338.45 270.61 4.500 1047.84 423.95 623.88 Pass 11117.96 8719.42 10975.00 8708.84 64.65 66.45 339.26 270.57 4.500 1058.74 426.37 632.38 Pass 11125.00 8719.24 11000.00 8709.17 65.05 66.83 340.07 270.54 4.500 1069.86 428.73 641.12 Pass 11131.78 8719.06 11025.00 8709.43 65.39 67.19 340.85 270.51 4.500 1080.92 430.86 650.06 Pass ~~. ~ by BP Alaska Anticollision Report ~c.r Bates iNTEQ CompaayE BP Aml1C0 Date: 11/19/2007 Time: 16:03538 Page: 19 Field:. Prudhoe Bay Refere>ce Site: PB DS 18 Go-ordinate(NE) Reference: WeN:18-32, True: North Reference Well: 18-32: Vertical (TVb) Reference: 59:32 5/31/1998:09:46 54.0 Reference WeIIpath: Ptan 2, 18-32 6' Db: oracle Site: PB DS 1 8 Well: 18-32 Rule Assigned: Major Risk Wellpath: 18-32 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis ' Ctr-Ctr No-Go' Albwabte MD TVD ' MD TVD Ref Offset TFO+AZt TF0.HS Casiog/HSllistaace Area ' Deviation Warning ft ft ft ft- ft ft_ deg deg in ft ft ft 11138.46 8718.89 11050.00 8709.45 65.73 67.54 341.64 270.50 4.500 1092.97 432.91 660.06 Pass 11150.00 8718.59 11075.00 8709.42 66.32 67.90 343.03 270.50 4.500 1105.49 435.75 669.74 Pass 11150.00 8718.59 11095.00 8709.40 66.32 68.10 343.00 270.47 4.500 1115.64 436.37 679.27 Pass Site: PB DS 1 8 Well: 18-32 Rule Assigned: Major Risk Wellpath: 18-32A V2 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD' TVD MD TVD .Ref: Offset TFO+AZI TFQ-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9200.00 8207.98 9200.00 8207.98 50.48 49.77 75.02 0.00 0.00 228.50 -228.50 FAIL 9225.00 8227.77 9225.00 8227.77 50.60 49.98 74.83 0.00 0.00 229.21 -229.21 FAIL 9250.00 8247.52 9250.00 8247.56 50.72 50.18 74.71 0.00 0.08 229.64 -229.56 FAIL 9274.94 8266.60 9275.00 8267.35 50.96 50.50 267.69 190.75 1.14 111.11 -109.97 FAIL 9299.78 8284.59 9300.00 8287.12 51.25 50.85 278.21 198.50 3.92 136.57 -132.65 FAIL 9325.01 8303.79 9325.00 8306.88 51.49 51.16 291.56 209.66 5.77 186.16 -180.39 FAIL 9350.17 8324.23 9350.00 8326.59 51.67 51.43 314.21 229.62 6.64 270.11 -263.47 FAIL 9374.85 8345.40 9375.00 8346.26 51.78 51.64 345.56 257.53 8.28 338.35 -330.07 FAIL 9398.70 8366.75 9400.00 8365.87 51.83 51.81 12.29 279.85 12.48 332.95 -320.47 FAIL 9421.43 8387.79 9425.00 8385.43 51.82 51.94 28.71 290.45 19.41 299.61 -280.20 FAIL 9442.82 8408.05 9450.00 8404.93 51,74 52.04 38.47 292.05 28.63 269.47 -240.84 FAIL 9462.73 8427.24 9475.00 8424.35 51,63 52.11 44.56 287.26 39.85 246.57 -206.72 FAIL 9481.15 8445.18 9500.00 8443.70 51.50 52.16 48.75 277.61 52.68 229.89 -177.21 FAIL 9497.90 8461.58 9525.00 8462.77 51,34 52.22 51.77 264.83 67.24 217.14 -149.90 FAIL 9521.00 8484.14 9550.00 8481.23 51,26 52.35 53.08 278.31 82.89 213.51 -130.62 FAIL 9546.82 8508.94 9575.00 8498.77 51,22 52.49 53.16 289.26 98.40 217.08 -118.68 FAIL 9574.35 8534.68 9600.00 8515.26 51.20 52.65 52.50 295.73 113.73 223.73 -110.00 FAtL 9603.44 8560.85 9625.00 8530.44 51.24 52.82 51.36 299.52 129.02 231.97 -102.95 FAIL 9634.35 8587.19 9650.00 8544.58 51.33 53.02 49.75 301.54 143.96 242.17 -98.22 FAIL 9667.47 8613.40 9675.00 8558.20 51.49 53.23 47.65 302.29 157.96 254.29 -96.32 FAIL 9702.14 8638.23 9700.00 8571.56 51.73 53.44 44.94 301.87 170.98 268.23 -97.26 FAIL 9735.62 8659.34 9725.00 8584.34 52.04 53.65 41.46 300.16 184.14 283.75 -99.62 FAIL 9769.37 8677.48 9750.00 8595.95 52.40 53.87 38.04 298.27 197.25 298.00 -100.75 FAIL 9804.79 8692.85 9775.00 8606.46 52,83 54.15 34.85 296.47 209.42 310.66 -101.24 FAIL 9841.70 8704.62 9800.00 8615.85 53.33 54.48 31.73 294.66 220.24 322.14 -101.90 FAIL 9879.08 8711.93 9825.00 8624.04 53.85 54.85 28.51 292.69 229.88 332.69 -102,81 FAIL 9915.37 8714.46 9850.00 8631.41 54.37 55.24 25.11 290.39 238.32 342.32 -104.00 FAIL 9930.11 8714.59 9875.00 8638.76 54.26 55.11 24.49 288.01 245.33 346.08 -100.75 FAIL 9944.85 8714.72 9900.00 8646.14 54.12 54.94 24.04 285.79 252.11 348.77 -96.67 FAIL 9959.55 8714.85 9925.00 8653.44 53.93 54.72 23.75 283.73 258.79 350.48 -91.68 FAIL 9974.22 8714.97 9950.00 8660.62 53.71 54.45 23.60 281.82 265.32 351.36 -86.04 FAIL 9988.89 8715.10 9975.00 8667.68 53.41 54.14 23.60 280.05 271.64 351.37 -79.73 FAIL 10003.50 8715.23 10000.00 8674.53 53.09 53.78 23.71 278.42 277.92 350.75 -72.83 FAIL 10018.06 8715.35 10025.00 8681.06 52.72 53.38 23.97 276.93 284.33 349.46 -65.13 FAIL 10032.63 8715.47 10050.00 8687.32 52.30 52.93 24.35 275.56 290.42 347.62 -57.19 FAIL 10047.16 8715.60 10075.00 8693.34 51.84 52.43 24.84 274.31 296.39 345.30 -48.91 FAIL 10061.69 8715.72 10100.00 8698.84 51.32 51.90 25.48 273.20 302.26 342.47 -40.21 FAIL 10076.36 8715.84 10125.00 8702.95 50.78 51.31 26.44 272.40 307.69 339.24 -31.55 FAIL 10091.23 8715.96 10150.00 8704.79 50.15 50.67 27.87 272.05 312.22 335.51 -23.29 FAIL 10130.16 8716.28 10175.00 8706.40 51.68 52.18 25.06 271.80 314.06 344.64 -30.58 FAIL 10201.29 8716.84 10200.00 8706.86 55.41 55.91 16.56 271.85 309.98 366.97 -56.99 FAIL by BP Alaska Anticollision Report ~.r s ~I~s INTEQ 'Company: BP Amoco Date: .11/19/2007. Time: 16:03:38 Page: 20 Field: Prudhoe Bay Reference Site: PB DS 18 Co-ordi®ate(NE) Reference: Web: 18-32, True North Reference Well: 1$-32 Vertical (TVD) Refere®ce: 59 a 32 5/31/1996 09: 46 54.0 Reference WellpathE Plan 2; 18-32 6" Db: Oracle Site: PB DS 18 Weli: 18-32 Rnle Assigned: Major Risk Weltpath: 18-32A V2 Inter-Site Error: 0.00 ft Reference ONset Semi-Major Aai4 3 Ctr-Ctr No-Go ' Allowable MD TVD MD TVD Ret Offset TFO+AZI TFO-HS Casing/llSilistance Area Devjatioo Warning ft tt ft ft ft ft deg deg in ft- ft ft 10266.76 8717.35 10225.00 8705.73 57.79 58.31 9.07 272.21 301.70 381.21 -79.51 FAIL 10327.24 8717.80 10250.00 8703.34 59.08 59.60 2.44 272.84 292.12 388.78 -96.66 FAIL 10383.20 8718.19 10275.00 8699.67 59.44 59.98 356.66 273.77 281.84 390.65 -108.81 FAIL 10434.49 8718.52 10300.00 8696.72 59.10 59.63 351.36 274.63 270.08 388.16 -118.08 FAIL 10452.45 8718.64 10325.00 8694.77 59.47 59.97 352.87 275.31 258.11 389.95 -131.85 FAIL 10467.24 8718.75 10350.00 8693.71 59.94 60.43 355.14 275.80 247.71 392.44 -144.73 FAIL 10482.80 8718.90 10375.00 8693.08 60.39 60.85 357.40 276.19 239.30 394.79 -155.50 FAIL 10498.90 8719.07 10400.00 8693.03 60.80 61.22 -0.43 276.43 232.54 396.99 -164.45 FAIL 10515.28 8719.27 10425.00 8693.86 61.12 61.53 1.54 276.44 226.40 398.89 -172.49 FAIL 10531.84 8719.50 10450.00 8694.82 61.40 61.78 3.51 276.43 220.45 400.47 -180.02 FAIL 10548.76 8719.75 10475.00 8695.30 61.62 61.96 5.61 276.49 216.26 401.62 -185.36 FAIL 10565.90 8720.03 10500.00 8695.09 61.74 62.06 7.88 276.71 213.49 402.14 -188.65 FAIL 10583.17 8720.34 10525.00 8694.62 61.80 62.10 10.20 276.96 212.44 402.23 -189.79 FAIL 10600.44 8720.68 10550.00 8694.43 61.80 62.05 12.37 277.06 213.79 402.01 -188.22 FAIL 10617.44 8721.03 10575.00 8694.68 61.69 61.93 14.30 276.95 217.92 401.40 -183.48 FAIL 10640.90 8721.55 10600.00 8695.13 61.94 62.15 14.31 276.77 224.34 402.97 -178.63 FAIL 10687.06 8722.44 10625.00 8695.60 63.14 63.34 8.70 276.69 230.50 410.16 -179.66 FAIL 10734.80 8723.14 10650.00 8695.77 63.79 63.97 2.96 276.67 235.52 413.96 -178.44 FAIL 10783.83 8723.61 10675.00 8695.39 63.81 63.98 357.18 276.77 239.43 413.90 -174.47 FAIL 10833.82 8723.82 10700.00 8694.40 63.15 63.31 351.40 276.98 242.26 409.69 -167.43 FAIL 10884.50 8723.75 10725.00 8693.18 61.80 61.96 345.55 277.19 244.24 401.27 -157.02 FAIL 10935.67 8723.31 10750.00 8692.46 59.76 59.91 339.46 277.23 245.22 388.77 -143.55 FAIL 10986.96 8722.48 10775.00 8692.26 57.05 57.22 333.18 277.09 244.90 372.39 -127.49 FAIL 11012.35 8721.94 10800.00 8692.47 57.30 57.44 332.94 276.93 244.28 373.87 -129.60 FAIL 11028.86 8721.57 10825.00 8692.86 58.64 58.74 334.70 276.70 245.98 381.98 -136.00 FAIL 11045.10 8721.20 10850.00 8693.28 59.88 59.95 336.35 276.41 250.17 389.59 -139.42 FAIL 11060.87 8720.83 10875.00 8693.76 61.02 61.06 337.89 276.06 256.67 396.64 -139.97 FAIL 11075.96 8720.47 10900.00 8694.26 62.07 62.06 339.31 275.67 265.54 403.13 -137.59 FAIL 11090.28 8720.12 10925.00 8694.54 62.99 62.96 340.67 275.31 276.50 408.85 -132.35 FAIL 11103.75 8719.78 10950.00 8694.49 63.83 63.75 342.00 275.02 289.30 413.96 -124.66 FAIL 11116.19 8719.47 10975.00 8694.23 64.54 64.43 343.24 274.76 304.03 418.34 -114.31 FAIL 11127.43 8719.18 11000.00 8693.92 65.17 65.02 344.34 274.52 320.70 422.15 -101.45 FAIL 11137.69 8718.91 11025.00 8693.82 65.69 65.52 345.30 274.25 338.65 425.39 -86.74 FAIL 11147.57 8718.65 11050.00 8693.81 66.20 65.96 346.23 273.99 356.85 428.40 -71.55 FAIL 11157.35 8718.39 11075.00 8693.81 66.64 66.38 347.17 273.76 374.86 431.13 -56.27 FAIL 11167.26 8718.13 11100.00 8693.76 67.08 66.78 348.16 273.56 392.31 433.74 -41.43 FAIL 11177.32 8717.86 11125.00 8693.54 67.50 67.16 349.22 273.41 409.08 436.25 -27.17 FAIL 11187.48 8717.58 11150.00 8693.06 67.88 67.51 350.34 273.31 425.27 438.50 -13.23 FAIL 11197.65 8717.30 11175.00 8692.33 68.25 67.84 351.50 273.25 441.06 440.65 0.41 Pass 11207.81 8717.02 11200.00 8691.44 68.57 68.14 352.68 273.21 456.46 442.54 13.92 Pass 11218.00 8716.74 11225.00 8690.21 68.87 68.41 353.92 273.23 471.35 444.28 27.07 Pass 11228.36 8716.45 11250.00 8688.78 69.15 68.66 355.21 273.27 485.35 445.88 39.47 Pass 11238.87 8716.16 11275.00 8687.17 69.39 68.88 356.53 273.34 498.39 447.26 51.13 Pass 11611.15 8705.64 11300.00 8685.34 55.49 54.88 316.17 272.28 509.96 363.47 146.50 Pass 11622.91 8705.46 11325.00 8683.39 56.79 56.14 317.81 272.51 504.19 371.08 133.10 Pass 11634.64 8705.28 11350.00 8681.41 58.03 57.37 319.46 272.75 497.52 378.42 119.10 Pass 11646.35 8705.09 11375.00 8679.65 59.25 58.58 321.09 272.98 490.08 385.63 104.46 Pass 11658.03 8704.91 11400.00 8678.63 60.43 59.75 322.64 273.13 481.83 392.61 89.21 Pass 11669.62 8704.74 11425.00 8678.02 61.57 60.87 324.15 273.24 472.45 399.40 73.05 Pass 11681.08 8704.56 11450.00 8677.55 62.67 61.96 325.63 273.35 461.91 405.91 56.01 Pass 11692.48 8704.39 11475.00 8677.87 63.72 63.01 327.02 273.37 450.55 412.22 .38.33 Pass by BP Alaska Anticollision Report ~it~ ~i ~s iNTEQ Company: BP Amoco Datr. 11/19/2007. Time: 16:03:38 Page: 21 Field• Prudhoe Bay Refeecnce Site: PB DS 18 Co-ordieate(NE) Reference: 1Nell: 18-32, True Nortlt Reference Well: Y8-32 Vertical (TVD) Reference: 59 ; 32 5/31/1996 09:46 54.0 Reference Weilpsth: Plan 2; 18-32 13 Db: Grade Site: PB DS 18 Well: 18-32 Rule Assigned: Major Risk Welipath: 18-32A V2 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axe Ctr-Ctr No-Go Allowable MD TVD MD TVD Ret OffsM TFO+AZI TFO-HS Casin~/II~istanee Area DewiAtioo Warniug ft ft ft ft ft ft deg deg in ft ft ft 11703.69 8704.22 11500.00 8678.86 64.73 64.01 328.31 273.32 438.05 418.32 19.73 Pass 11714.76 8704.05 11525.00 8679.83 65.68 64.97 329.59 273.27 424.58 424.09 0.49 Pass 11725.62 8703.88 11550.00 8680.41 66.61 65.89 330.91 273.28 410.07 429.63 -19.56 FAIL 11736.55 8703.72 11575.00 8680.76 67.48 66.77 332.27 273.33 395.25 434.87 -39.62 FAIL 11747.86 8703.55 11600.00 8681.11 68.37 67.65 333.67 273.38 380.90 440.18 -59.28 FAIL 11748.32 8703.55 11601.00 8681.12 68.41 67.69 333.73 273.38 380.34 440.40 -60.06 FAIL Site: PB DS 18 Well: 18-34 Ruie Assigned: Minor 1/1 0 Welipath: 18-34 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-MajorAais Ctrv/ar No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS CasinglHSflistance Area Deviation Warning ft ft_ ft ft ft ft deg deg in ft ft ft 84575.52 8188.99 9000.00 7903.06 565.51 55.80 121.06 45.86 7.625 672.60 0.00 672.60 Pass 9199.69 8207.73 9025.00 7924.01 50.47 55.98 121.45 46.43 7.625 674.04 0.00 674.03 Pass 9223.37 8226.49 9050.00 7944.96 50.59 56.15 121.82 46.98 7.625 675.43 0.00 675.43 Pass 9307.80 8290.55 9075.00 7965.91 51.33 56.77 123.63 43.27 7.625 675.26 0.00 675.26 Pass 9319.02 8299.11 9100.00 7986.84 51.44 57.09 124.22 42.87 7.625 674.65 0.00 674.65 Pass 9330.37 8308.04 9125.00 8007.76 51.53 57.40 124.72 42.29 7.625 674.49 0.00 674.49 Pass 9341.80 8317.30 9150.00 8028.66 51.61 57.68 125.13 41.49 7.625 674.77 0.00 674.77 Pass 9353.29 8326.86 9175.00 8049.56 51.69 57.96 125.46 40.46 7.625 675.49 0.00 675.49 Pass 9364.79 8336.65 9200.00 8070.52 51.74 58.22 125.73 39.20 7.625 676.69 0.00 676.68 Pass 10174.83 8716.63 9225.00 8091.54 54.16 56.48 130.51 22.61 7.625 677.17 0.00 677.17 Pass 10183.33 8716.70 9250.00 8112.62 54.56 56.92 129.90 23.03 7.625 656.40 0.00 656.40 Pass 10191.89 8716.77 9275.00 8133.72 54.97 57.36 129.34 23.49 7.625 635.77 0.00 635.77 Pass 10200.56 8716.84 9300.00 8154.82 55.38 57.78 128.83 24.02 7.625 615.31 0.00 615.31 Pass 10209.32 8716.91 9325.00 8175.90 55.74 58.18 128.36 24.61 7.625 595.05 0.00 595.05 Pass 10218.16 8716.98 9350.00 8196.98 56.11 58.57 127.96 25.26 7.625 575.00 0.00 575.00 Pass 10227.08 8717.05 9375.00 8218.03 56.47 58.94 127.61 25.99 5.500 555.17 0.00 555.17 Pass 10236.09 8717.12 9400.00 8239.04 56.79 59.30 127.32 26.78 5.500 535.53 0.00 535.53 Pass 10245.19 8717.19 9425.00 8260.00 57.12 59.64 127.09 27.64 5.500 516.10 0.00 516.10 Pass 10254.37 8717.26 9450.00 8280.91 57.42 59.96 126.93 28.58 5.500 496.91 0.00 496.9f Pass 10263.67 8717.33 9475.00 8301.73 57.69 60.26 126.84 29.61 5.500 478.02 0.00 478.02 Pass 10273.21 8717.40 9500.00 8322.36 57.98 60.55 126.82 30.73 5.500 459.61 0.00 459.61 Pass 10283.00 8717.47 9525.00 8342.75 58.22 60.82 126.88 31.96 5.500 441.71 0.00 441.71 Pass 10293.00 8717.55 9550.00 8362.92 58.46 61.07 126.99 33.28 5.500 424.19 0.00 424.19 Pass 10303.21 8717.62 9575.00 8382.89 58.68 61.30 127.16 34.67 5.500 407.03 0.00 407.03 Pass 10313.62 8717.70 9600.00 8402.63 58.86 61.51 127.40 36.16 5.500 390.28 0.00 390.27 Pass 10324.22 8717.78 9625.00 8422.18 59.04 61.70 127.76 37.79 5.500 374.08 0.00 374.08 Pass 10334.99 8717.85 9650.00 8441.57 59.17 61.86 128.27 39.60 5.500 358.58 0.00 358.58 Pass 10345.94 8717.93 9675.00 8460.76 59.29 61.99 128.93 41.57 5.500 343.77 0.00 343.77 Pass 10357.11 8718.01 9700.00 8479.67 59.37 62.10 129.72 43.70 5.500 329.69 0.00 329.69 Pass 10368.67 8718.09 9725.00 8498.05 59.43 62.18 130.59 45.96 5.500 316.52 0.00 316.52 Pass 10380.97 8718.17 9750.00 8515.38 59.45 62.22 131.42 48.27 5.500 304.67 0.00 304.67 Pass 10393.98 8718.26 9775.00 8531.52 59.43 62.22 132.26 50.67 5.500 294.62 0.00 294.62 Pass 10407.49 8718.35 9800.00 8546.63 59.36 62.19 133.15 53.18 5.500 286.50 0.00 286.50 Pass 10421.27 8718.44 9825.00 8561.04 59.25 62.11 134.13 55.81 5.500 280.07 0.00 280.07 Pass 10435.09 8718.52 9850.00 8575.09 59.10 61.98 135.22 58.56 5.500 275.00 0.00 275.00 Pass 10466.10 8718.74 9875.00 8588.72 59.91 62.97 140.54 61.33 5.500 271.06 0.00 271.05 Pass 10507.91 8719.18 9900.00 8601.77 60.98 64.27 148.08 63.87 5.500 266.59 0.00 266.59 Pass 10550.89 8719.78 9925.00 8614.17 61.64 65.12 155.53 66.16 5.500 261.31 0.00 261.31 Pass 10594.48 8720.56 9950.00 8625.77 61.80 65.47 162.78 68.18 5.500 255.06 0.00 255.06 Pass • by BP Alaska Anticollision Report • ~.r s INTEQ Company: BP Amoco Date: 11/19!2007 Time: 16:03:38 Pages 22 Fiehi: Prudhoe Bay Reference Site: PB DS 18 Co-ordin4te(NE) Reference: W811: 1$-32, True North Reference Well:, 1 8-32 Vertical (TIVD) Re[erence: 59:32 5!31!1996 09:46 54.0 Reference Wellpat6: Plan 2, 18-32 6 Db: Grade Site: PB DS 18 Well: 18-34 Rule Assigned: Minor ! /1 0 Wellpath: 18-34 V1 Inter-Site Error: 0.00 ft Reference Ottset Semi-Major Aais Gtr-Ctr Nato Allowable NID TVD MD TVD Ret Offset TFO+AZI TFO-HS Casina/HSflistaoee Area Deviation Wareing _ft ft R ft ft ft deg deg in ft ft ft 10632.81 8721.37 9975.00 8636.46 61.68 65.48 168.46 69.94 5.500 247.67 0.00 247.67 Pass 10648.32 8721.71 10000.00 8646.21 62.19 66.04 168.39 71.73 5.500 240.83 0.00 240.83 Pass 10664.24 8722.03 10025.00 8654.85 62.62 66.54 168.14 73.39 5.500 235.06 0.00 235.06 Pass 10680.51 8722.33 10050.00 8662.25 63.01 66.97 167.66 74.86 5.500 230.01 0.00 230.01 Pass 10697.11 8722.61 10075.00 8668.31 63.34 67.34 166.89 76.08 5.500 225.68 0.00 225.68 Pass 10713.99 8722.86 10100.00 8673.13 63.58 67.63 165.86 77.07 5.500 222.32 0.00 222.32 Pass 10731.03 8723,09 10125.00 8677.29 63.77 67.84 164.72 77.98 5.500 219.92 0.00 219.92 Pass 10748.18 8723,29 10150.00 8680.81 63.88 67.96 163.48 78.79 5.500 218.45 0.00 218.45 Pass 10765.39 8723,46 10175.00 8683.85 63.88 68.00 162.15 79.53 5.500 217.88 0.00 217.88 Pass 10782.59 8723.60 10200.00 8686.62 63.82 67.96 160.81 80.25 5.500 218.30 0.00 218.30 Pass 10799.70 8723.70 10225.00 8689.33 63.69 67.83 159.52 81.01 5.500 219.88 0.00 219.88 Pass 10816.68 8723.78 10250.00 8691.97 63.46 67.62 158.26 81.78 5.500 222.54 0.00 222.54 Pass 10833.48 8723.82 10275.00 8694.57 63.16 67.34 157.03 82.57 5.500 226.10 0.00 226.09 Pass 10850.04 8723.84 10300.00 8697.10 62.82 66.98 155.83 83.35 5.500 230.79 0.00 230.79 Pass 10866.30 8723.82 10325.00 8699.75 62.37 66.56 154.69 84.16 5.500 236.55 0.00 236.55 Pass 10882.26 8723.76 10350.00 8702.55 61.88 66.07 153.62 85.00 5.500 243.14 0.00 243.14 Pass 10897.92 8723.67 10375.00 8705.17 61.35 65.52 152.51 85.76 5.500 250.45 0.00 250.45 Pass 10913.23 8723.55 10400.00 8707.61 60.74 64.93 151.38 86.47 5.500 258.68 0.00 258.67 Pass 10928.18 8723.40 10425.00 8709.96 60.11 64.29 150.25 87.12 5.500 267.66 0.00 267.66 Pass 10942.75 8723.21 10450.00 8712.04 59.43 63.60 149.07 87.69 5.500 277.45 0.00 277.45 Pass 10956.93 8723.01 10475.00 8713.48 58.72 62.89 147.79 88.10 5.500 288.04 0.00 288.04 Pass 10970.83 8722.78 10500.00 8713.79 57.98 62.13 146.30 88.28 5.500 299.10 0.00 299.10 Pass 10984.38 8722.53 10525.00 8713.13 57.20 61.34 144.66 88.27 5.500 310.66 0.00 310.66 Pass 10997.57 8722.26 10550.00 8712.14 56.42 60.53 143.02 88.20 5.500 322.75 0.00 322.75 Pass 11058.89 8720.88 10575.00 8711.51 60.88 65.42 149.99 88.39 5.500 334.02 0.00 334.02 Pass 11140.43 8718.84 10600.00 8711.17 65.83 70.87 160.10 88.71 5.500 341.62 0.00 341.61 Pass 11228.71 8716.44 10625.00 8710.83 69.16 74.56 171.05 89.07 5.500 344.95 0.00 344.95 Pass 11265.28 8715.41 10650.00 8710.42 69.78 75.27 173.07 89.17 5.500 345.02 0.00 345.02 Pass 11279.78 8714.99 10675.00 8709.92 69.83 75.33 171.32 89.16 5.500 345.71 0.00 345.71 Pass 11294.24 8714.57 10700.00 8709.36 69.80 75.33 169.57 89.14 5.500 347.39 0.00 347.39 Pass 11308.61 8714.14 10725.00 8708.84 69.72 75.25 167.83 89.13 5.500 349.93 0.00 349.93 Pass 11322.90 8713.70 10750.00 8708.58 69.59 75.12 166.15 89.17 5.500 353.01 0.00 353.01 Pass 11337.12 8713.27 10775.00 8709.12 69.37 74.91 164.61 89.33 5.500 356.16 0.00 356.16 Pass 11351.25 8712.83 10800.00 8710.24 69.12 74.65 163.17 89.59 5.500 359.34 0.00 359.34 Pass 11365.28 8712.39 10825.00 8711.57 68.79 74.33 161.77 89.87 5.500 363.03 0.00 363.03 Pass 11379.16 8711.95 10850.00 8712.84 68.42 73.96 160.37 90.14 5.500 367.52 0.00 367.52 Pass 11392.93 8711.51 10875.00 8713.97 67.99 73.52 158.96 90.38 5.500 372.48 0.00 372.48 Pass 11406.65 8711.07 10900.00 8715.02 67.51 73.03 157.53 90.60 5.500 377.13 0.00 377.12 Pass 11420.34 8710.62 10925.00 8715.98 66.98 72.47 156.09 90.81 5.500 381.41 0.00 381.41 Pass 11434.00 8710.18 10950.00 8717.02 66.39 71.86 154.66 91.02 5.500 385.31 0.00 385.31 Pass 11447.62 8709.73 10975.00 8718.06 65.77 71.19 153.24 91.23 5.500 389.00 0.00 389.00 Pass 11461.18 8709.28 11000.00 8718.81 65.08 70.46 151.77 91.39 5.500 392.86 0.00 392.86 Pass 11474.65 8708.84 11025.00 8719.36 64.36 69.69 150.28 91.52 5.500 397.28 0.00 397.28 Pass 11488.01 8708.43 11050.00 8719.43 63.56 68.88 148.73 91.57 5.500 402.14 0.00 402.14 Pass 11501.23 8708.04 11075.00 8718.71 62.77 68.01 147.08 91.50 5.500 407.63 0.00 407.63 Pass 11514.26 8707.67 11100.00 8717.34 61.90 67.09 145.36 91.34 5.500 413.87 0.00 413.87 Pass 11527.06 8707.34 11125.00 8715.65 61.04 66.18 143.62 91.13 5.500 420.89 0.00 420.89 Pass 11539.62 8707.03 11150.00 8713.85 60.12 65.22 141.89 90.91 5.500 428.74 0.00 428.74 Pass 11551.98 8706.74 11175.00 8711.98 59.21 64.24 140.19 90.69 5.500 437.03 0.00 437.03 Pass 11564.11 8706.48 11200.00 8710.13 58.25 63.24 138.52 90.47 5.500 445.94 0.00 445.94 Pass 11576.01 8706.24 11225.00 8708.78 57.30 62.21 136.94 90.32 5.500 455.46 0.00 455.46 Pass by BP Alaska Anticollision Report ~.r 1NTEQ Company: BP Amoco DAte: 11/t9/2007 Time: 16:03:38 Page: 23 Field:, Prudhoe Bay , Reference Site: PB DS 18 Co-ordinate(NE) Reference: WeN: 18-32, True North ..:Reference Well: 18-32 Vertical (TVD) Reference:.. 59:32 5/3i/1996 08:46 54.0 Reference Wellpath: PIan2, 18-32 8 Db: Orate Site: PB DS 18 Well: 18-34 Rule Assigned: Minor 1/1 0 Wellpath: 18-34 V1 later-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref lNfset TFO+AZI TFO-HS Casmg/HSDistaoee Area: Deviation Warning ft R ft if ft ft deg deg in ft ft ft 11587.67 8706.02 11250.00 8708.27 56.31 61.18 135.50 90.28 5.500 465.54 0.00 465.54 Pass 11600.00 8705.81 11275.00 8708.30 55.26 60.02 134.04 90.30 5.500 476.31 0.00 476.31 Pass 11962.28 8700.70 11300.00 8708.41 77.74 84.47 175.20 90.92 5.500 478.55 0.00 478.55 Pass 11974.53 8700.56 11325.00 8708.41 77.88 84.61 173.76 90.95 5.500 473.42 0.00 473.42 Pass 11986.92 8700.41 11350.00 8707.99 77.84 84.69 172.25 90.93 5.500 468.98 0.00 468.98 Pass 12000.00 8700.26 11375.00 8707.00 77.99 84.71 170.58 90.83 5.500 465.13 0.00 465.13 Pass 12011.98 8700.13 11400.00 8705.72 77.84 84.70 169.01 90.69 5.500 462.02 0.00 462.02 Pass 12025.00 8698.98 11425.00 8704.41 77.88 84.60 167.30 90.55 5.500 459.84 0.00 459.84 Pass 12037.35 8699.84 11450.00 8703.02 77.73 84.47 165.67 90.40 5.500 458.24 0.00 458.24 Pass 12050.00 8699.69 11475.00 8701.88 77.56 84.27 164.03 90.27 5.500 457.47 0.00 457.47 Pass 12062.86 8699.55 11500.00 8701.42 77.29 84.01 162.44 90.23 5.500 457.76 0.00 457.76 Pass Alaska Department of Natural Resources Land Administration System Page 1 o f • _,, a ' i~~;;< ~ ~;~: ~ ...- .. ~._is ~~;~~~ l~rs ~==~a~arch State Cabins ~~#u~l 3~Dt1E'£~S ~.w aS C File Type: ADL File Number: _ 28305 ~ ~ Printable Case i=ile_Summary See Township, Range, Section and Acreage? ~ New Search _~ Yes ~"` No LAS Menu ~ Case Abstract ~ Case Detail ~ Land Abstract _ ,. F[le: ADL 283(1 `'''~' Search for Status fiat Updates -~, c,l I2%0~%200, Customer: 000107377 BP EXPLORATION (ALASKA) [NC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995I966I2 Case Type: ~° OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Locution: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2480.000 Date Initiatec~_ 05/28/1965 Office of Prirnury Responsibility : DOG DiV OIL AND GAS Las[ Transaction Dute: 12/04/2006 C.'ase Subhpe : ~~ NORTH SLOPE Lust Transactron: AA-NRB ASSI GNMENT APPROVED Merrdaan: l! 7~n~>nship: UI IN i~lats 2~nrge: OI4F Section: 17 Sectzon:1rr~~s: Olt) ~~-~rc~~ NIeYZCIZQJI.~ 1 ~ U l1'NS~7Ip: O I ~ ~ Kange: O I ~~ I ~, .~~i'C/(ull.~ ~ ii ~)eetjoj? rl ~ PF'S': S ~)~) Meridian: U 7~uu~rt.~~Iti~,: 0 I I ~! Range: 014E ,~'c~clrr,~~.~ I ~> Se~~~iufr .lc~j~~~s: fiQ I -Lleridian: U 1 ~u~~nshi~~: 0 I 1 N Range: 014E ~S~ctio~~7: ,0 Sf~~-~~r~;ir .acres: 640 Legal Description 0~-28-196 **'SALpNOTK'ELEGALDESCRIPTION*~* C1=1-12611 N 1-~E Ull%I 17;18,19, 20 2=~<g0.00 U- 3- ? a'~5~ Last updated pR 1,.2/0512007. http://www.dnr.state.ak.us/las/Case Summary.cfm?FileType~~DL&FileNumber=28305&... 12/5/2007 TR.ANSMTTTAnL LETTE>RpCHECKLIST WELL NAME /`"~~ / O '~~~ PTD# 0~0 ~/6 ~~ Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. , API No. 50- API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data aad logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (SO- -_, from records, data and togs acquired for wel) SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and Qroduce /inject is contingent upon issuance of a conservation order approving a spacing exception. , assumes the liability of any protest to the spacing exception that may occw. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coat bed methane is not allowed Well for (name of well) until after f Com~}~Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Comuany Name) must contact the Commission to obtain advance approval of such water wel! testing ro m. Rev: 7/132007 r ~ ^ ^ ~ c , , ~' ~ d o , ~ ~ ~ ~ ~ ~ ~, E' Q ,' a' , , ~ m ~' ~ , ~, ~ , , , a, , ~ ~ ~ ~ a, y t N d , a a c~ l0' `~~ L , ° H s~~ v, O W to to, i ~ , •~, 3 m; ~~ a~ ~~ , C a U '~ , r ~ ~ ~ ~ Z' dl, n; m~ ~ i1 a cn' a, ~ ~ Z ~ ~ ~ ~ ~, G O), ~~ N. , Z, , ~ M, a, N. m, eG , T ~ ~ ~ M M, c' CO c ~ U) ~, ~, ~ M' ~, y ~ , ,a~ ~ C• ~, Qy a' ..,. N. ~ M, ~' N z i ~ ~ ~ N, ~ ~ O V ~ £ as ~ - N O _ N , , ~ t h' a, ~ , ~ ~ z '~ ~ z ' ~ ~ m a m ~ ~; ~ ~ a , m' a, c n ' , , , ~ , ~ ~, ~ , o ~ ~ ; ~ ¢; z ~~ °, °, °, a~, m, ~, °, m, m, ~, m, ¢; ¢~ ¢z ~ ¢; ¢' ¢; ¢ v, ~, m, m, a~, m, ¢ m, °, m, m, m, ¢; °, ~ ¢; ¢; m, , , r, r, r, ~, r, r, ~-, r, ~-, r, z , z r, ~, , z z, z z, ~-, ~, r, r, ~-, z ; r, r, ~-, r, ~-, ~-, z, z, z , z z r, , U ua a , w c, -, , •~ E 3, , ~, ~ ~ ~ , o 7 3 ~, p , .. , O , ~~ ' ' m ~ o w x ~ , ~ c, u ~ _ ,t ~, , ~, J ~, ~ . m, m " ~' ~ ' ° ~ ` ° a , ~ , __,~ ter ; ~ ~ ~ m ~ m, m ~. _ ~ a ~ w - •a' a ~ ~ w ~ c r " o ~' ~ a'~ m; _~ ~ o o ~, m ~ ~; ~ •~; a = c >, ~ m ~; •-, m ~ 'o M' , a, c, ~ ' a, 4 F-. c o + atS; a m' ~, c, m, ~ • ma ~ N ~, °. ~ S o . _ o o = v ~' , a "' ~ ~ ~' w o' o, Q ~ °. rn ~ ~ ~ n .a~ °; ~, ~, o ur n., " ~, ~, 3, $ ~ ~ ~' ~ ~ "m m ~ , ~ m' ~ c' p ~ :. a c' m' a o, m a, is ~ ~ ~, ¢, ~ ~, ~, a, a ~ ~ ~ OC a ¢ ~ ~' 4 ~ ~ ?A .~ ~' o' ~ ~, m a m ~ ~, o, a, ~ , ~ = 3 c, o; "'" °; `' ma m ~ ~~ 4 chi ~ ~ a ~ ° ~ p •~ ~ z o, o ~ :° ~° ~ n «~, ~ ~ ~ 3 " 4 ~ ~ a a, €, ~ ~ 3 ~ N m ~; ~~ ~ _, 'o U ~ `w °"' c'ci' ' m `"'' c ~ ~ ° .~' Q °' o i `~' ~ o ' m' 3, a- s m 6' ' ~`' ' w V jJ O , , ' m , a' c' 1 a' a, p G 4., 'O~ a, >, Gx `a M m m ` m ` o ' , , ) ` , , p '~, O' m o C' £' ..., > O, , {j' p ~N' a p O ~' ~ m "'' ' $ ~~ ar y, °' O . ~ Q '~' W, ~' O' , ~ ~ ° w C O; s O a, ~ ~ Z vf, O, ®, _ Q ~ F- ¢ a' ~, f , , ~ O. 3 , t - 3 m' av ~ m, m. o< o. ~ ~, o. ~, ~i 7' d C w~ ~ ~ ~~ m cg; '', ° ~c, a n m' m - W W r ~, ~, m -r3 ~ ~ O ~ , w ~, G v, ..., d) 3' N ~, 3, _, ~ o O' m, aY c, t, 7 ~' °, ~, ~ Q, Q~ ~, ~, ~ 4 ~ l6 h! m G HJ C 44' , O) m C' i7j ~' O' ~ t!Y N • O' ~r ~, N ~ _, c,, Hl, ~ .~, O, G. Z N t6 ~' m ~ W, C ~ ~ C ~' ~' ~ yj 9L .~ - ~ a a a u c m' ~ 0> OF ~5, C, .0, ~ .a ~ , ~ - , a -_, _' C! O' @ m "~ Y>, > ~ _ ~ G Y' ld p °: o- ~ .G ~ ~ ' p ~ m ~=, p 7 p' U' `~ , Gt ~' .fl, c, ?~ :~ GT m =c, ~, lL dX _ ~, m, m ~ m, .~, p L G ~ _ _ ~ G v, _, a V v , _' a ` ~ O ~ ~' j ~ U W' M, N' U C (` W w ' ~ t~3' ~ ~' +~' O O V t O~ ~' O W ? ~ ...' = • ... .r ~y rte, ' ' Q ~, "' _ ~ ~ 3 O' ~ U '~ N a m .~ ~ m o' o' ° !n' is ~. m, o ~ ~, rA g - - - ~ m ~ ~~ o, ._.' a~ p' -_ cc o. ~ ~ c - . ~, $' ~' ~, 3 c `C I- 1- }- a ~' g, ~' ~, m G m ' ~ ~ ~ m' w, w, a o ' ur m' m, s~ "~~ =-' a £ ° m' •~, y, p m ,~ , m, o a~, ~ •c, m' m ar ~ a a a m 3 , G t m m, m; - m o ' ' o, ~, r; ~; ~' aA ~ ~ m a m, a, '°, •- ' 0. , a d O, t, ~ °~ ~~ ' ' ' : m, ~ , ~ c, ! m, °, m ~ ~ c n., ~, ~, S; ~; ~; cn, ~; O O; n.; a U ~ ¢; a z U cn U U V; r- ¢ ~- a; U; ¢ m; m U ~ `-~ ~ a A, cn, sn; U Q r O r N M ~Q tq (p A CO Ol r r N M V' In <O (~ r r r r CO O O N r r N N N M V' to t0 1~ CO N N N N N N O O r N M M N M~ M M M lA SO M M !~ q~pp O M M M ~ - - - ~-- - O .- O O ;~ O C ~ ~ W N ~ N V O . t~ f0 O r Q <O ~ ~ G ~ G t0 N N O ~ N ~ N W c dl ~ ~ O q~ ~ L C ~. U , Q ¢ Q ~ ~ ~ Q ~ (~ Well History ~=ile APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically . organize this category of information. ~ ~ **** REEL HEADER **** MWD 08/05/07 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/02/24 1826337 01 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!! !!!!!!!!! Remark File Version 1.000 !!!!!!!!!! !!!!!!!!! Extract File: ldwg.las Version I nformation VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9158.0000: Starting Depth STOP.FT 11377.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 18-32B FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 45.110"N 148 deg 26' 50.341"W CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 24-Feb-2008 API API NUMBER: 500292258502 Parameter Information Block #MNEM.UNIT Value Description #-- - --------------- ---------- ---- ------------------ SECT. 24 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 54 Feet Above Perm. Datum DMF DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 54 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD)unless otherwise noted. • (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVD) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger - GR CNL as per Roger Furley with BP (Alaska) Exploration, Inc. Resistivity data has also been clipped at 2000 ohm.m. (8) The sidetrack was drilled from 18-32 through a milled window in 4 1/2 inch liner. Top of window 9240 ft.MD (8185.7 ft.TVDSS) Bottom of window 9248 ft.MD (8191.9 ft.TVDSS) (9) Tied to 18-32 at 9192 ft.MD (8147.7 ft. TVDSS) (10) The resistivity data from 9234 feet to 9867 feet MD (8180.9 feet to 8645.4 feet TVDSS) was MAD passed up to 62 hours after drilling. The MAD pass data was substituted for drilled data per the wellsite geologist. (11) The interval from 11335 feet to 11376 feet MD (8649.7 feet to 8649.9 feet TVDSS) was not logged due to sensor to but offset. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROPA -> Rate of Penetration 3.0 Avg (ft/hour) RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) (400kHz),Ohm-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) (2MHz),Ohm-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9175.92, 9175.92, ! 0 9180.27, 9179.65, ! -0.621094 9183.8, 9182.14, ! -1.6582 9186.08, 9185.87, ! -0.207031 9189.6, 9188.15, ! -1.45117 9192.5, 9192.29, ! -0.207031 9227.32, 9226.91, ! -0.415039 9230.64, 9230.01, ! -0.62207 9233.12, 9232.09, ! -1.03613 9235.4, 9234.78, ! -0.62207 9238.1, 9237.06, ! -1.03711 9239.55, 9238.93, ! -0.62207 9242.45, 9242.04, ! -0.414062 9248.05, 9248.05, ! 0 9249.71, 9248.88, ! -0.829102 9252.2, 9251.37, ! -0.829102 9253.8, 9252.97, ! -0.829102 9260.43, 9259.6, ! -0.829102 9261.05, 9260.64, ! -0.415039 9262.09, 9261.88, ! -0.207031 9264.37, 9264.78, ! 0.414062 9270.17, 9270.38, ! 0.208008 9272.87, 9272.45, ! -0.415039 9275.35, 9275.56, ! 0.208008 9278.05, 9278.88, 9283.65, 9283.44, 9285.1, 9285.1, 9287.38, 9288, 9290.49, 9290.9, 9294.01, 9293.39, 9296.5, 9295.88, 9299.65, 9299.44, 9302.34, 9302.14, 9303.8, 9304, ! 9312.14, 9312.55, 9320.64, 9320.64, 9329.34, 9329.55, 9345.55, 9345.97, 9360.06, 9360.89, 9371.88, 9372.29, 9373.75, 9374.16, 9375.82, 9376.65, 9399.24, 9400.48, 9412.5, 9413.33, 9417.89, 9418.72, 9433.02, 9434.05, 9440.69, 9441.1, 9442.14, 9442.76, 9447.11, 9448.15, 9458.46, 9459.7, 9487.06, 9487.48, 9490.59, 9490.59, 9497.84, 9498.05, 9515.09, 9515.71, 9518.61, 9518.61, 9528.56, 9529.39, 9554.93, 9553.48, 9556.38, 9555.76, 9561.15, 9559.7, 9562.39, 9561.36, 9564.67, 9564.05, 9566.54, 9565.92, 9570.06, 9569.86, 9575.25, 9573.59, 9576.91, 9575.45, 9577.73, 9576.91, 9580.84, 9579.19, 9586.23, 9585.61, 9588.72, 9587.89, 9591.42, 9590.59, 9596.18, 9594.73, 9599.71, 9598.67, 9602.61, 9601.37, 9604.89, 9603.85, 9626.44, 9625.4, 9632.66, 9632.04, 9634.94, 9634.11, 9637.22, 9636.81, 9638.67, 9638.67, 9662.04, 9659.55, 9683.6, 9680.9, 9686.71, 9684.84, 9689.61, 9687.74, 9697.94, 9698.77, 9704.58, 9703.75, 9711.62, 9708.51, 9715.15, 9711.62, 9725.66, 9727.32, 9733.54, 9735.61, 9736.03, 9737.89, 9739.76, 9791.42, ! 0.829102 ! -0.207031 I ! 0.62207 ! 0.415039 ! -0.62207 ! -0.62207 ! -0.208008 ! -0.207031 0.207031 ! 0.414062 ! 0 ! 0.208008 ! 0.415039 ! 0.829102 ! 0.414062 ! 0.415039 ! 0.829102 ! 1.24414 ! 0.830078 ! 0.829102 ! 1.03613 ! 0.415039 ! 0.62207 ! 1.03711 ! 1.24414 ! 0.415039 ! 0 ! 0.207031 ! 0.621094 ! 0 ! 0.829102 ! -1.45117 ! -0.62207 ! -1.45117 ! -1.03613 ! -0.62207 ! -0.62207 ! -0.207031 ! -1.6582 ! -1.45117 ! -0.829102 ! -1.6582 ! -0.621094 ! -0.829102 ! -0.829102 ! -1.45117 ! -1.03613 ! -1.24414 ! -1.03711 ! -1.03711 ! -0.62207 ! -0.829102 ! -0.415039 ! 0 ! -2.4873 ! -2.69434 ! -1.86523 ! -1.86523 ! 0.830078 ! -0.829102 ! -3.10938 ! -3.52441 ! 1.6582 ! 2.07324 ! 1.86621 ! 1.6582 i 9742.87, 9744.53, ! 1.6582 9749.92, 9748.67, ! -1.24316 9758.41, 9758.61, ! 0.207031 9774.58, 9775.61, ! 1.03711 9782.85, 9783.06, ! 0.208008 9783.89, 9785.96, ! 2.07227 9785.34, 9787.21, ! 1.86523 9791.37, 9792.61, ! 1.24414 9797.99, 9797.36, ! -0.62207 9802.35, 9803.39, ! 1.03613 9812.29, 9812.09, ! -0.207031 9846.81, 9847.84, ! 1.03711 10003.1, 10000.8, ! -2.28027 10016.4, 10014.5, ! -1.86621 10024.1, 10023, ! -1.03711 10104.7, 10105.3, ! 0.62207 10172.4, 10171.2, ! -1.24316 10333.9, 10332.2, ! -1.6582 10369.6, 10370.6, ! 1.03613 10408.5, 10408.9, ! 0.415039 10520.6, 10520.8, ! G.207031 11099, 11099, ! 0 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 190 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN 18-32B 5.xtf LCC 150 CN BP (Alaska) Exploration Inc. WN 18-32B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!ii!!!iiiiii!! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth log provided by Schlumberger - GR CNL per Roger Furley with BP Alaska. Resistivi has also been clipped at 2000 ohm.m. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 124 Tape File Start Depth = 9158.000000 Tape File End Depth = 11377.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 137 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 18-32B.xtf LCC 150 CN BP (Alaska) Exploration WN 18-32B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!~~~~ Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -------------- CNAM ODEP GR ---- GR ----------- GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 247 Tape File Start Depth = 9158.000000 Tape File End Depth = 11377.000000 • Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 260 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/02/24 1826337 01 **** REEL TRAILER **** MWD 08/05/07 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes C~ Tape Subfile 1 is type; LIS • Tape Subfile 2 is type; LIS DEPTH GR ROP RAD RAS RPD RPS 9158.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9158.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 32.3727 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 154.8159 12.3178 4.0054 3.6973 4.0470 5.9765 9400.0000 70.1544 33.2392 51.8130 2000.0000 128.6048 92.9035 9500.0000 25.4021 118.1216 13.8297 34.3565 50.7228 95.7162 9600.0000 84.1721 17.4815 19.5451 21.1620 16.6530 12.7960 9700.0000 26.1343 66.0970 41.9420 462.2328 160.8435 146.8674 9800.0000 64.8036 23.9607 52.6749 2000.0000 154.7147 110.1174 9900.0000 58.7630 30.1789 45.1523 2000.0000 149.9890 114.9085 10000.0000 83.3860 81.2565 46.2261 2000.0000 120.1972 101.1981 10100.0000 54.5098 90.8155 39.8107 2000.0000 150.9810 122.3460 10200.0000 61.4695 88.4475 44.6986 2000.0000 136.3000 104.4270 10300.0000 66.7796 106.3802 44.7157 2000.0000 129.9230 100.6550 10400.0000 67.6140 93.7430 37.5060 289.3930 104.8990 90.6540 10500.0000 77.3029 136.6698 39.8631 728.7965 104.6990 86.1962 10600.0000 65.1492 103.4183 37.1589 324.4770 100.4072 87.5190 10700.0000 68.0540 109.2850 37,8656 175.7650 87.3640 74.9830 10800.0000 68.8899 152.9581 42.8493 2000.0000 91.3220 74.5497 10900.0000 64.7201 149.5866 40.5184 2000.0000 90.0122 72.7959 11000.0000 68.9000 102.8801 42.7358 2000.0000 • 111.6680 85.6880 11100.0000 67.1000 57.2000 40.8730 87.6020 68.1000 11200.0000 59.7000 60.0000 44.1920 163.3580 125.2440 11300.0000 57.1000 52.7000 46.1680 167.2320 126.2730 11377.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9158.000000 Tape File End Depth = 11377.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 2000.0000 2000.0000 2000.0000 -999.2500 • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9158.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9158.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 33.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 206.8000 12.9000 4.0570 3.7680 4.0320 5.7840 9400.0000 56.9000 34.0000 47.7790 6064.5400 179.4830 127.6950 9500.0000 25.3000 119.5000 14.2820 39.0220 58.5310 119.4380 9600.0000 100.7000 28.4000 19.0140 19.0290 14.3790 11.0850 9700.0000 23.2000 66.6000 41.9420 450.5090 167.9110 148.5140 9800.0000 64.5000 23.9000 52.4020 6064.5400 154.3090 109.4990 9900.0000 59.1000 30.2000 45.3490 6064.5400 149.9890 115.7760 10000.0000 77.8000 98.8000 43.0410 6064.5400 122.9860 96.1140 10100.0000 55.0000 81.6000 38.7980 6064.5400 150.9810 122.3460 10200.0000 65.5000 80.3000 44.7020 6064.5400 136.3000 104.4270 10300.0000 66.3000 150.6000 44.3250 6064.5400 129.9230 100.6550 10400.0000 68.9000 93.9000 37.7650 300.0840 104.8990 88.9180 10500.0000 78.3000 136.1000 40.3360 808.5640 104.6990 87.5190 10600.0000 64.7000 96.3000 37.0780 324.4770 100.7510 87.5190 10700.0000 68.8000 101.3000 37.9460 178.0600 87.3640 74.9830 10800.0000 68.6000 153.6000 42.7810 5332.7012 91.3220 74.4930 10900.0000 64.1000 150.0000 40.5530 6064.5400 89.9720 72.7700 11000.0000 68.9000 100.7000 42.7920 6064.5400 • 111.7520 85.6880 11100.0000 67,1000 57.2000 87.6020 68.1000 11200.0000 59,7000 60.000C 163.3580 125.2440 11300.0000 57,1000 52.7000 167.2320 126.2730 11377.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9158.000000 Tape File End Depth = 11377.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 40.8730 44.1920 46.1680 -999.2500 6064.5400 6064.5400 6064.5400 -999.2500 Tape Subfile 4 is type: LIS