Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-030
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU E-10B Mill CIBP, Patch Perfs Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-030 50-029-20623-02-00 13062 Conductor Surface Intermediate Liner Liner 9040 80 2703 9789 1367 2402 12981 20" x 30" 13-3/8" 9-5/8" 7" 4-1/2" 9040 31 - 111 30 - 2733 28 - 9817 9458 - 10825 10658 - 13060 31 - 111 30 - 2700 28 - 7622 7348 - 8474 8330 - 9040 12981 2670 4760 5410 7500 None 5380 6870 7240 8430 10832 - 12970 4-1/2" 12.6# 13Cr80 25 - 10667 8480 - 9040 Structural 4-1/2" Baker S-3 Perm Packer 10590, 8272 10590 8272 Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 26 - 8338 N/A N/A 11 289 1297 21581 0 87 350 1000 1912 980 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:17 am, Aug 03, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.03 05:59:25 -08'00' Torin Roschinger (4662) DSR-8/4/23 RBDMS JSB 080323 WCB 3-8-2024 ACTIVITY DATE SUMMARY 7/22/2023 LRS CTU #2 - 1.75" Blue Coil Job Objective: Mill CIBP MIRU CTU. ...Continued on WSR 7-23-23.... 7/23/2023 LRS CTU #2 - 1.75" Blue Coil ***Cont. from WSR 7-22-23*** Job Objective: Mill CIBP Make up milling BHA with 2-7/8" motor and 3.70" 5-bladed reverse clutch mill. RIH. Load well with 1% KCl with SafeLube. Tag CIBP at 12280' CTM / 12299' MD. Mill the plug and push to ~ 12981' MD. FP well while POOH. Inhibit and blow down coiled tubing string. Rig down CTU. ***Job Complete*** 7/25/2023 ***WELL S/I ON ARRIVAL*** RAN KJ, 3' x 1-3/4" STEM, 3.69" CENT, 2-1/2" SAMPLE BLR TO DEVIATE OUT @11,766' SLM RAN 45 KB PACKER DRIFT WITH 20' 3-1/2" SPACER PIPE TO 11,000' SLM(3.69" x 30') *** WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED *** 7/29/2023 *** WELL SI ON ARRIVAL *** INITIAL T/I/O = 0/300/50 RUN BAKER PATCH TO 10829-10860 FT. CCL - TOP MID ELEMENT = 13.2 FT, CCL STOP = 10815.8 FT 2200/1520 LB LINE WEIGHT, SLACKED AFTER SETTING, GOOD SET. CORRELATED TO SLB PERFORATION RECORD DATED 15-AUG-2019 ELINE COMPLETE FINAL T/I/O = 0/300/50 *** WELLSI ON DEPARTURE, DSO NOTIFIED *** Daily Report of Well Operations PBU E-10B j Make up milling BHA with 2-7/8" motor and 3.70" 5-bladed reverse clutch mill. RIH.g Load well with 1% KCl with SafeLube. Tag CIBP at 12280' CTM / 12299' MD. Mill the plug and push to ~ 12981' MD. RUN BAKER PATCH TO 10829-10860 FT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL DPFRATInNS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate R1 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development Z Exploratory ❑ 5. Permit to Drill Number: 208-030 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20623-02-00 7. Property Designation (Lease Number): ADL 028304 & ADL 028280 8.Well Name and Number: PBU E-1013 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 13062 feet Plugs measured 12299 feet SEP 0 g 2019 true vertical 9040 feet Junkmeasuretl None feet Effective Depth: measured 12299 feet Packer measured 10590 feet true vertical 9036 feet Packer true vertical 8271 feet gOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 31 - 111 31 -111 Surface 2703 13-3/8" 30-2733 30-2700 5380 2670 Intermediate 9789 9-5/8" 28-9817 28-7622 6870 4760 Liner 1368 7' 9458-10826 7348-8474 7240 5410 Liner 2402 4-1/2" 10658 - 13060 8330-9040 8430 7500 Perforation Depth: Measured depth: 10832 - 12970 feet True vertical depth: 8480-9040 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 25-10667 25-8337 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 10590 8271 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 195 10604 22 0 672 Subsequent to operation: 219 16081 26 0 889 14. Attachments: (requiredper20nnc25.070.25.071,&25283) 15. Well Class after work: Daily Report of Well Operations 8 Exploratory ❑ Development 71 Service ❑ Stratigrephic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 21 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ I GSTOR ❑ WINJ ❑ WAG ❑ GNU ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Oshiro, Joleen Contact Name: Oshiro Joleen Authorized Title: EG Pad Engineer/New Wells Delivery PE/I Contact Email: JOLEEN.OSHIROnbp.com Authorized Signature: Date: 'A Contact Phone: +1 907 564 4606 Form 10-404 Revised 04/2017 V ISA-Wltdr1 / RBDMS SEP 1 12019 Submit Original Only .tel t /// /r9 of Well LOADED TUBING W/ 180 BBLS CRUDE FORATE INTERVAL 10832'- 10857' WITH 2.5" POWERJET OMEGA HSD, 6 SPF, 60 DEG TIE INTO HALLIBURTON COIL FLAG DATED 19 -MAR -2019. ***JOB COMPLETE, WELL LEFT SHUT-IN ON DEPARTURE. PAD OP NOTIFIED TO POP*** TREE= 63/8" CMV WELLHEAD= FMC'. ACTIATOR= AXE -SON KB. B -EV = 60.53' BF. ELEV = 32.36' KOP= 2100' Mar Ann1e = 9'i" 7 17lZd• E-1 REV BY 0 B DATE REV BY COMMENTS SAFETY NOTES: WELL ANGLE >70" @ 11589-. *** 4-12" CHROME TBG *** ? ANGLE ATTOP PERF: 31'@ 10832' Note: Refer to Pmdwtion DB for Nstorioal pertdata SIZE SPF INTERVAL Datum TVD= 8800'SS 20" CONDUCTOR, 91.5#, H-00, ID = 19.124" 1:i38" CSG, 72#, L-80 BTC, D = 12.347" 1-t__2733- Minimum 12733'Minimum ID = 3.725" 0 10655' 4-1/2" XN NIPPLE 9-5/8' X 7" BKR ZXP LNR TOP PKR9458' w/ 11.65' PBR, D=6.310' 9-5/8" X 7' BKR HMC LNR HGR, D = 6.330' 9476' 9SB' EZSV (03/28/08) 9838' 4-1/2" TUBING STUB (0321/08)10215' 19-5/B" CSG, 47#, L-80. D = 8.681" I TOP, .0152 bpf, ID = BTC -M, .0383 bpf, IC PBTD 12981' .0152 bpf, ID= 3.958' 13060' I 2194' 1 14-1/2- HES X NP, ID = 3.813- 10 3 1 3769 3500 47 KBG2-1R DOME BK 16 0627/10 2 7348 5910 51 KBG2-1R SO BK 20 05/12/19 1 10272 7998 31 KBG2-1R DMY BK n nRn7/1n MILLOUT WINDOW (E-108) 9817'-9834- DATE REV BY PERFORATION SUMMARY DATE REV BY COMMENTS REF LOG: ??? ? ANGLE ATTOP PERF: 31'@ 10832' Note: Refer to Pmdwtion DB for Nstorioal pertdata SIZE SPF INTERVAL NS z SHOT SOZ 2-12" 6 10832-10857 O 08/15/19 O4MSM8 23/4" 6 11830-11926 O 0321/19 HB/PJC 23/4" 6 11926-11958 O 0320/19 GLV CM (0627/10) 2-78" 6 12150-12250 O 04/07/08 2-7/8" 6 12340 -12970 C 04/07/08 TOP, .0152 bpf, ID = BTC -M, .0383 bpf, IC PBTD 12981' .0152 bpf, ID= 3.958' 13060' I 2194' 1 14-1/2- HES X NP, ID = 3.813- 10 3 1 3769 3500 47 KBG2-1R DOME BK 16 0627/10 2 7348 5910 51 KBG2-1R SO BK 20 05/12/19 1 10272 7998 31 KBG2-1R DMY BK n nRn7/1n MILLOUT WINDOW (E-108) 9817'-9834- DATE REV BY COMMENTS DATE REV BY COMMENTS 08/7987 ? ORIGINAL COMPLETION 0729/14 TBD/JMD SET OH CHOKE (0726/14) 062090 NIES RWO 03/10/17 ZV/JMD PULLED DH CHOKE (03M9/17) OSR7M9 NORDIC CTDSOTRACK(E-t0A) 0325/19 JUWJMD SET CISP S ADPERFS O4MSM8 WES SIDETRACK (E-708) 05/15/19 JPKIJMD GLV C/O (05112/19) 07/02/08 HB/PJC DRLG DRAFT CORRECTIONS 0820/19 NXW/JMD ADPERFS 08/15/19 0628/10 TA/PJC GLV CM (0627/10) 10559" 1-14-112" HES X NP, D = 3.813' 10590' 7" X 4-12" BKR S-3 PKR, D = 3.870" 3.813" 1 10655' -4-112" HES XN NP, D= 3] 10658' 7" X 5" HR ZXP LTP w 111.36' PBR, ID=4.410" 10667' 4-112' WLEG, D=3.958" 10676' 7" X 5" BKR FLEX - LOCK HCR, D = 4.430" 10686' � 5" X 4-1/2" XO, D = 3.958" 12299'-�4-12'BKRMP(0 1023 1s) PRUDHOE BAYUNIT WELL: E -10B PERMITNo: '2080300 API No: 50-029-20623-02 SEC 6, T11 N, R14E, 354' FNL 8 501' FEL BP EzplombDn (Alaska) HLULIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS APR 9 5 ?nen 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Operations 6a down '❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing❑ Change Approved Program 7 � ❑ Plug for Reddil ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set CIBP 0 2. Operator Name: BP Exploration (Alaska), Inc 14, Well Class Before Work Development 0 1 Exploratory ❑ 5. Permit to Dnll Number 208-030 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-20623-02-00 7. Property Designation (Lease Number): ADL 028304 & ADL 028280 8. Well Name and Number: PBU E-108 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11, Present Well Condition Summary: Total Depth: measured 13062 feet Plugs measured 12299 feet true vertical 9040 feet Junk measured None feet Effective Depth: measured 12299 feet Packer measured 10590 feet true vertical 9036 feet Packer true vertical 8271 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 31 - 111 31 - 111 Surface 2703 13-3/8" 30-2733 30-2700 4930 2670 Intermediate 9789 95/8" 28-9817 28-7622 6870 4760 Liner 1368 7' 9458-10826 7348-8474 7240 5410 Liner 2402 4-1/2" 10658 - 13060 8330-9040 8430 7500 Perforation Depth: Measured depth. 11830 -12970 feet True vertical depth: 9039-9040 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 25-10667 25-8337 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 10590 8271 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 308 26518 18 0 1058 Subsequent to operation: 308 10771 44 0 226 14. Attachments: (mquire per20 MC 25.070.25,071, a 2s.2WI 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Oshiro, Joleen Contact Name: OshiroJoleen Authorized Title: EG Pad Engineer/New Wells Delivery PE Contact Email: JOLEEN.OSHIROQbp.com '4110111 Authorized Signature:del-0--Date: Contact Phone: +1 907 564 4606 Form 10-404 Revised 04/2017 V ,044 " RBDMS_. �l�vJ APR 16 2019 Submit Original Only Daily Report of Well Operations PBU E -10B ACTIVITYnATF ci innnnnoV CTU #9 -1.75" Coil - 0.156 wt HS 90 Job Objective: Set CIBP and AddPerf MIRU CTU. Make up 2.875" GR/CCL carrier with 3.70" DJN and rih. Load well with 1 % KCI w/ SafeLube. Drift to TO at 12793 CTMD and log up to 10,000' painting a white/orange flag at 12,200'. +20' correction. MU/RIH with BOT 4.5" 1AA CIBP. Set down on something at 2264' CTM. Try pumping down CTBS. Unable to pass, pooh to inspect tools. Gauge bha, max OD 3.6". Quite a bit of schmoo on the tools. Decision to get a more true representative drift from BOT before rih with cibp. MU/RIH with 3.62"x 6'+3.57"x1' Drift to 3800', observed a very slight bobble through previous set down depth of 2263'. Likely was just schmoo that was the culprit. 3/19/2019 ...Job in Progress ..... CTU #9 1.75" Coil. 0.156WT HS 90 Job objective: Set CIBP and AddPerf POOH with BOT drift. MU/RIH with BOT 4.5" 1AA CIBP. Correct depth to ME at flag and set CIBP at 12300'. Top of plug=12,,299.31'. POOH, pump 50bbls of safelube across kick off point due to reactive c rome drag, tObbl 50/40 FP cap. Make up perf gun run #1 with 32'x 2.75" Millenium perf gun, 6 spf and RIH. Tie into CIBP and shoot 11926-11958'. POOH. Lay down guns, shots fired. Trim 1 00'of pipe, Change pack offs. Make up pert gun run #2 with 32'x 2.75" Millenium perf gun, 6 spf and RIH. 3/20/2019 ..Continued on WSR 3-21-19... CTU #9 1.75" Coil. 0.156WT HS 90 Job objective: Set CIBP and AddPerf RIH w/ perf gun #2 HES guns 32' of 2.75 Millenium charges 6spf. Tie in at flag to confirm PBTD. Tag PBTD and corect to bottom shot. Perforate 11894-11926. Pump 40bbls of safelube down CTBS for chrome drag, 10bbl 60/40 cap. POOH. RIH w/ pert gun #3 HES guns 32' of 2.75 Millenium charges 6spf. Tie in at flag to confirm PBTD. Tag PBTD and corect to bottom shot. Perforate 11862-11894, Pump safelube down CTBS, 10bbl 60/40 POOH. RIH w/ perf gun #4 HES guns 32' of 2.75 Millenium charges 6spf. Tie in at flag to confirm PBTD. Tag PBTD and corect to bottom shot. Perforate 11830-11862. Circulate KCL out of well with diesel. POOH. 3/21/2019 ***Job Continued on 3/22/19*** CTU #91.75" Coil. 0.156WT HS 90 Job objective: Set CIBP and AddPerf Continue POOH with fourth perf gun. All shots fired and ball recovered. Inhibit reel with 15bbl of KI - 3090 and then blow down with N2. RDMO. Well freeze protected with 143bbl of diesel. 3/22/2019 "`Job com letel* TRM= = 6-3/8" aW WELLHEAD= FMC ACRIATOR= AXELSON KB. HEV = 60.53' BF. H.EV = 32.36' KOP= 2100 Max Angle = 93' Q 12234' Datum MO= 11344' Datum TVD = 880(y SS, Y ii::l :,e3 E- 0 6J SAFETY NOTES: W ELL ANGLE >70" @ 11589'. ""• 4-1 /2- CHROME TBG ""' my 3 1 3769 1 3500 47 KBG2-1R DOME BK 16 2 7348 5910 51 KBG2-IR SO BK 20 1 10272 7998 31 KBG2-1R DW BK 0 MLLOOT WINDOW (E -10B( 9817'-9834- "412" B 1 3.870.870" 2" HES X NP, D = 3.813" REV BY )- ODNDl1CTOR 91.5#, H-00, D = 19.124" 11W REV BY C.OMMIrf5 PERF'ORATDN Sl1MuMRY 133/8" CSG, 72#, L-80 BTG D = 12.347'2733' JORGINALCOMPLETION 07/29/14 TBD/JMO SErwCHDKE(07/26/14) 05/20190 Minimum ID = 3.725" @ 4-1/2" XN NIPPLE 10665- REF LOG ?" ZV/JMO KILLED DH CHOKE(03IM17) 05127/99 NORDIC 9-5/8' X 7' BKR ZXP LNR TOP PXR w / 11.65' PBR 1D = 6.310" 9456' 412" WE, D=3.958" -518"X 7' BKR HMC LNR HGR, D = 6.330" 9476' TX 5" BKR FLEX - LOCK HGR D = 4.430" SUE 9-5/8' WFPSTOCK(03/28/08) 9816' Y ii::l :,e3 E- 0 6J SAFETY NOTES: W ELL ANGLE >70" @ 11589'. ""• 4-1 /2- CHROME TBG ""' my 3 1 3769 1 3500 47 KBG2-1R DOME BK 16 2 7348 5910 51 KBG2-IR SO BK 20 1 10272 7998 31 KBG2-1R DW BK 0 MLLOOT WINDOW (E -10B( 9817'-9834- "412" B 1 3.870.870" 2" HES X NP, D = 3.813" 41/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, D= 3.958" 10667' 7" LNR 26#, L-80 BTC -M, .0383 bpf, D = 6.276' 10826' PBTD H 12981' TBG, 12.6#, L-80 TCI, .0152 bpf, DATE I REV BY 10658' 7" X 5" HR ZXP UP REV BY C.OMMIrf5 PERF'ORATDN Sl1MuMRY ? JORGINALCOMPLETION 07/29/14 TBD/JMO SErwCHDKE(07/26/14) 05/20190 w / 11.36' PBR, D = 4.410" R1VO REF LOG ?" ZV/JMO KILLED DH CHOKE(03IM17) 05127/99 NORDIC ANGLEATTOP FHiF: 88"@ 11830' 10667 412" WE, D=3.958" Note: Refer to Production DB for historical pert data 10676' TX 5" BKR FLEX - LOCK HGR D = 4.430" SUE I SPF I NrEIWAL Opn/Sgz SHOT SQZ 2-3/4" 6 11830 - 11926 O 03121/19 GLV a0 (06127110) 2-3/4" 6 11926 - 11958 O 03120/19 10686' S' X 41/2' XO, D= 3.958' 2-7/8" 6 12150 - 12250 O 04/07/0B 2-7/8" 6 12340 - 12970 C 04107/08 41/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, D= 3.958" 10667' 7" LNR 26#, L-80 BTC -M, .0383 bpf, D = 6.276' 10826' PBTD H 12981' TBG, 12.6#, L-80 TCI, .0152 bpf, DATE I REV BY I CONTA3 S DATE REV BY C.OMMIrf5 08119181 ? JORGINALCOMPLETION 07/29/14 TBD/JMO SErwCHDKE(07/26/14) 05/20190 NIES R1VO 03/10/17 ZV/JMO KILLED DH CHOKE(03IM17) 05127/99 NORDIC CTOSOTRACK(E10A) 03125119 JDMJkD SEr CBP&ADPERFS 04109/08 N70 SIDETRACK (610B) 07/02!08 HB/PJC MCG DRAFT CORRECTDNS 06/28N0 TA/PJC GLV a0 (06127110) PfdAH OEBAY LMr WELL . 610B PERMT No:2080300 AH No: 50-029-2062302 SEC 6, T11 R R14E, 354' FW & 501' FT3 BP Exploration (Alaska) OPERABLE: Producer E-lOB (PTD #0300) Tubing integrity resotred. • Page 1 of 2 Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator [AKDCWeIIlntegrityCoordinator@bp.com] 2 ,~~t~+ro Sent: Sunday, June 27, 2010 7:39 PM ' l~ To: AK, D&C Well Integrity Coordinator; Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, D&C Well Services Operations Team Lead; AK, RES GPB West Production Optimization Engineer; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Production Optimization Engineer; AK, OPS GC1 Facility OTL; AK, OPS GC1 Ops Lead; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; Cismoski, Doug A; Engel, Harry R Cc: Ramsay, Gavin; Janowski, Carrie ~ Subject: OPERABLE: Producer E-10B (PTD #2080300) Tubing integrity resotred All, Producer E-10B (PTD #2080300) passed an MITIA after the qas lift valves were dummied off. The passing test verifies that tubing integrity has been restored. The well has been reclassified as Operable and may be placed on production when convenient for operations. Please be careful when placing the - well on production as the IA is fluid packed. Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659-5102 Harmony Radio x2376 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 rx~1., E f. From: AK, D&C Well Integrity Coordinator Sent: Friday, June 25, 2010 4:44 AM To: 'Regg, James B (DOA)'; Maunder, Thomas E (DOA); 'Schwartz, Guy (DOA)'; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Production Optimization Engineer; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Production Optimization Engineer; AK, OPS GCl Facility OTL; AK, OPS GCl Ops Lead; AK, OPS GCl OSM; AK, OPS GCl Wellpad Lead; Cismoski, Doug A; Engel, Harry R Cc: Ramsay, Gavin; AK, D&C Well Integrity Coordinator; Janowski, Carrie Subject: UNDER EVALUATION: Producer E-10B (PTD #2080300) Sustained casing pressure on the IA All, Producer E-106 (PTD #2080300) has been found to have sustained casin pressure on the IA. The well broke MOASP on 06/24/10 with TIO pressures of 2100/2100/0 psi. A subsequent TI1= aC~Ted later that day after the IA pressure wouldn't bleed down. The~well has been reclassified as Un er v uation and has been placed under the 28 day clock. The following action will be taken. 1. DHD: TIFL -FAILED 2. Slickline: Set DGLV 3. Pumping: MIT-IA to 3000 psi, LLR if fails A TIO plot and wellbore schematic are attached. Please contact me with any questions. « File: E-10B TIO Plot 06-24-10.doc» « File: E-10B.pdf» Thank you, 7/15/2010 OPERABLE: Producer E-lOB (PTD #0300) Tubing integrity resotred • Page 2 of 2 Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659-5102 Harmony Radio x2376 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 7/15/2010 PBU E-lOB PTD 2080300 6/25/2010 TIO Pressures Plot 4:000 Well: E-10 • 3,000 2,000 1,000 03127110 04/10!10 04124110 05108110 05122110 06!05110 0611911 D -#- T bg ~- I~t -~- OA OOA ^ OOOA On TREE = 6-318" CIW WFJ I HEAD = FMC ACTUA 1 OR = AXELSON KB. EL.EV = 60.53' BF. ELEV = 32.36' KOP = 2100' Max Angle = 93° @ 12234' Datum MD = 113µv' Datum TVD = 8800' SS SAFETY ES: WELL ANGLE>70° @ 11589'. E ~ ~ ~ g *"`* 4-112" CHROME TBG *** I 2194' ~ 4-1/2" HES X NIP, ID = 3.813" 20" CONDUCTOR, 91.5#, H-µ0, ID = 19.124" - 110' 13-318" CSG, 72#, L-80 BTC, ID = 12.347" 2733' Minimum ID = 3.725" @ 10655' 4-1/2"" HES XN NIPPLE 9-5/8" X 7" BKR ZXP LNR TOP PKR gµ5$' w / 11.65' PBR, ID = 6.310" 9-518" X 7" BKR HMC LNR HGR, ID = 8.330" 9476' 9-5/8" WHIPSTOCK (03/28!08) 9816' 9-518" EZSV (03128708) 10559' ~-j4-1/2" HES X NIP, ID = 3.813" 7" X 4-1 /2" BKR S-3 PKR, ID = 3.870" 4-112" TUBING STUB (03121/08) 10624' (-) 4-1 /2'" HES X NIP, ID = 3.813" ~ 9-5/8" CSG, 47#, L-80, ID = 8.681 " ~ PERFORATION SUMMARY REF LOG: ??? ANGLE AT TOP PERF: 91 ° @ 12125' Note: Refer to Production DB far historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 6 12150 - 12250 O 04/07/08 2-718" 6 12340 - 12970 O 04/07/08 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" 7" LNR, 26#, L-80 BTC-M, .0383 bpf, ID = 6.276" i ~-~- 4-1/2" TBG, 12.6#, L-80 TGII, .0152 bpf, ID = 3.958" 10655, I- ~ 4-112" HES XN NIP, ID = 3.725" 10658' 7" X 5" HR ZXP LTP w / 11.36' PBR, ID = 4.410" 10667' 4-1/2" WIEG, ID = 3.958" 10676' 7" X 5" BKR FLE X LOCK HGR, ID = 4.430" 106- 8~ 5" X 4-1/2" XO, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 08/19/81 ? ORIGINAL COMPLETION 06!09/08 ?/ PJC DRLG DRAFT CORRECTIONS 05/20190 N1 ES RWO 07/02!08 HB/PJC DRLG DRAFT CORRECTIONS 05127199 NORDIC GTD SDTRACK (E-10A} 04/09/08 N7ES SIDETRACK (E-106) 04/19/08 CJN/SV GLV G/O 05/14/08 KDCISV GLV CIO PRUDHOE BAY UNIT WELL: E-108 PERMIT No: 2080300 API No: 50-029-20623-02 SEC 6, T11 N, R14E, 354' FNL & 501' FEL BP Exploration (Alaska) 9-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3769 3500 47 KBG2-1 R DOME BK 16 05/14/08 2 7348 5910 51 KBG2-1 R DOME BK 16 05!14(08 1 10272 7998 31 KBG2-1 R SO BK 20 05(14(08 MILLOUT WINDOW {E-108} 9817' - 9834' DATA SUBMITTAL COMPLIANCE REPORT 2/17/2010 Permit to Drill 2080300 Well Name/No. PRUDHOE BAY UNIT E-10B Operator BP EXPLORATION (ALASKA INC API No. 50-029-20623-02-00 MD 13062 TVD 9040 Completion Date 4/9/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey es DATA INFORMATION Types Electric or Other Logs Run: USIT / CBL / CCL, DIR / GR / RES / MWD / PWD, DIR / GR / RE / DE (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / T M@U/Frmt IVN maer Name scale meaia No start stop ~h Kecervea comments ~ D Asc / Directional Survey 0 13062 Open 4/14/2008 pt Directional Surrey 0 13062 Open 4/14/2008 Lo Induction/Resistivity 25 Blu 9853 13010 Open 7/3/2008 MD Vision Service o duction/Resistivity In 25 Blu 9853 13010 Open 7/3/2008"('~tyTB Vision Service j~ D C Lis 16554 dTnduction/Resistivity 9777 13057 Open 7/3/2008 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, DRHO, NPHI Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y~ Daily History Received? ~.JN Chips Received? Formation Tops ~ N Analysis Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 2/1712010 Permit to Drill 2080300 Well Name/No. PRUDHOE BAY UNIT E-106 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20623-02-00 MD 13062 TVD 9040 Completion Date 4/9/2008 Completion Status 1-OIL Current Status 1-OIL UIC N Compliance Reviewed By: Date: ~~ C~ 07/03/08 Schrumberer NO.4768 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 WP_II .Inh $ 1 nn rlncrrinfinn n~fe nl f~..li.. rn MPB-50 11999019 RST WFL ~ 06/13/08 1 1 M-04 11962601 PRODUCTION PROFILE 06/21/08 1 1 P1-24 12066527 MEM LDL (~~°°' f 06/18/08 1 1 04-11A 11975778 LDL l°I, - / 06/24/08 1 1 M-04 11962601 PRODUCTION PROFILE 70 06/21/08 1 1 12-03 12071857 USIT l ~ -- j . `(p 06/21/08 1 1 GNI-03 12066530 MEM PRESS/TEMP LOG ~~ ~ 06/20/08 1 1 E-10B 40016750 OH MWD/LWD EDIT 04/05/08 2 1 18-13B 11972960 MCNL Vim-- (a ~ 12/07/07 1 1 18-13B 12021159 MCNL v ~ 05/18/08 1 1 r'LCNJC NV n.1VVYVLGIJ VIC ACV CIf' 1 OT A1t711V11V L7 AIVV nCl UI'1IVIIVIa VIVC I.VYT CHlil'7 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. - Anchorage, Alaska 99508 Date Delivered: ~~~ ~. ~ t+~,~+_ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ~ ATTN: Beth r'1 , AV Received by: - r ~~+i STATE OF ALASKA ~~-~ ~°~~~` ~~~ ALAS~OIL AND GAS CONSERVATION COMMISSION 2008 Ivl ~\Y ® 9 WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,~iaska Gii ~ Gas Cans. Comrnissvi 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class• nC Ofa9 ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 4/9/2008 12. Permit to Drill Number 208-030 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 3/30/2008 i 13. API Number 50-029-20623-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 4/5/2008 ~ 14. Well Name and Number: PBU E-106 FEL, SEC. 06, T11 N, R14E, UM 353 FNL, 500 Top of Productive Horizon: 417' FNL, 2115' FEL, SEC. 01, T11 N, R13E, UM 8. KB (ft above MSL): 59.77' Ground (ft MSL): 30.2' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 241' FNL, 3401' FEL, SEC. 01, T11N, R13E, UM 9. Plug Back Depth (MD+TVD) 12981' 9040' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 664449 y- 5976710 Zone- ASP4 10. Total Depth (MD+TVD) 13062' ~ 9040' ' 16. Property Designation: ADL 028280 TPI: x- 657953 y- 5976507 Zone- ASP4 Total Depth: x- 656663 y- 5976656 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): USIT ! CBL / CCL, DIR / GR / RES / MWD / PWD, DIR / GR / RE /DEN / NEU `//~~dN~' 94~1~Md (02~? ~Td19 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM . TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" In ulated onduc or urface 110' Surface 110' 36" 8 cu ds Concrete 13-3/8" 72# L-80 Surface 2733' Surface 2700' 17-1/2" 4185 cu ft Arcticset II 9-5/8" 47# L-80 Surface 9 17' Surface 7622' 12-1/4" 1565 cu ft Class'G' 130 cu ft AS I 7" 2 L-80 9458' 10826' 7348' 8474' N/A 320 cu ft Class'G' 4-1/2" 12.6# L-80 10658' 13060' 8330' 9040' 6-1/8" 348 cu ft LiteCrete 23. Open to production or inject ion? ®Yes ^ No 24. TuewG RECORD If Yes, list each interval open (MD+TVD of To & Bottom; Perforation Size and Number): SIZE DEPTH .SET MO PACKER .SET MD p 2-7/8" Gun Diameter 6 spf 4-1/2", 12.6#, 13Cr80 10667' 10590' , MD TVD MD TVD 12150' - 12250' 9041' - 9037 12340' - 12970' 9036' - 9040' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED Freeze Protect w/ 155 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. 4"'" .. _ r .~ None ~ v / il: ~ ; ~°~ ~t• _ ~, i i; _ G Form 10-407 Revised 02/2007 ~' ~ ~ ~ /~ CONTINUED ON REVERSE SIDE ~~ JU~ ~ ~ '}000 ''~ HL ~ 1 U ~~aa ~ 28. GEIjLOGIC MARKERS (LIST ALL FORMATIONS RKERS ENCOUNTERED): 29. FORMATION TESTS NAME D TVD Well Test ? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10823' 8472' None Shublik 10875' 8515' Sadlerochit 10970' 8586' Top CGL 11117' 8692' Base CGL 11200' 8753' 23S6 11292' 8822' 22TS 11373' 8880' 21 TS 11465' 8936' Zone 1 B 11592' 8991' TDF /Zone 1A 11761' 9032' Formation at Total Depth (Name): TDF /Zone 1A 11761' 9032' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Si ned ~ ~~/~~ ~8 9 Terrie Hubble Title Drilling Technologist Date PBU E-106 208-030 Prepared By NameMumber. Terrie Hubble, 564-4626 Well Number Permit No. / A royal No. Drilling Engineer: Mehrdad Nadem, 564-5941 INSTRUCTIONS GeNeRa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Leak-Off Test Summary Page 1 of 1 Legal Name: E-10 Common Name: E-10 __ __- - - yp p (T ) Test. Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW Test Dat~ Test T e -Test De th MD __ - __ -, - -. ___ 3/29/2008 FIT 9,770.0 (ft) 7,586.0 (ft) 10.40 (ppg) 440 (psi) 4,538 (psi) 11.52 (ppg) 4/2/2008 FIT 10,850.0 (ft) 8,495.0 (ft) 8.40 (ppg) 485 (psi) 4,192 (psi) 9.50 (ppg) Printed: 4/21/2008 1:16:50 PM BP EXPLORATION Page 1 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: i Date From - To Hours Task Code NPT I Phase ~ Description of Operations 3/22/2008 12:00 - 14:00 2.00 MOB P PRE Pull pits away f/rig. 13:00 - 16:00 3.00 MOB P PRE Move Iliamna Camp, truck shop f/P2-45 to E-10. Rig maintenance, CO brushes on top drive. Balance bearings on mud pumps. 16:00 - 22:00 6.00 MOB P PRE Move pits f/P2-45 to E-10. Bridle up, lay over derrick. Pull rig off P2-45 after notifying pad operator. Stage on pad. 22:00 - 00:00 2.00 MOB P PRE Move 7ES sub f/P2-45 to E-10. 3/23/2008 00:00 - 02:00 2.00 MOB P PRE Move 7ES substructure f/P2-45 to E-10. 7ES on standby ready to move on E-10. Accept rig on standby at 02:00. 02:00 - 19:00 17.00 MOB N WAIT PRE Stage sub on E-Pad. Raise derrick, prepare rig to move on E-10. Waiting on Drill Site Support to move wellhouse and prepare location. Rig maintenance. CO oil in top drive. CO heat exchanger on casing tong hydraulic pump. CO tube oil pump for topdrive. Hang tree in cellar. Clean and mop and then mop and clean. 19:00 - 23:00 4.00 RIGU P PRE Move sub over E-10. Level rig. Spot pits, tie in pits to sub w/hoses and lines. 23:00 - 00:00 1.00 RIGU P PRE RU circulation lines on wellhead. Prep rig floor. 3/24/2008 00:00 - 02:00 2.00 WHSUR P DECOMP Take on brine into pits. Accept rig over well. OA, IA, Tbg all 0 psi. RU and pump 2.7 bbls to test OA to 2000 psi f/30 mins w/chart. Good test. 02:00 - 03:00 1.00 WHSUR P DECOMP PU/RU Drill Site Maintenance Lubricator. Test to 500 psi. Pull BPV. LD DSM lubricator. 03:00 - 07:00 4.00 WHSUR P DECOMP Reverse circulate clean 8.5 ppg seawater down the annulus through tubing cut at 10215' and displace 26 bbls diesel f/tubing 138 gpm, 200 psi. Swap pumps to tubing and pump 50 bbls Safe Surf O ahead of seawater. Circulate out 154 bbls diesel plus Safe Surf O until clean 210 gpm, 360 psi. Overboard diesel and contaminated seawater directly to Drill Site Maintenance diesel disposal tank. Monitor well. 07:00 - 08:00 1.00 WHSUR P DECOMP FMC dry rodded TWC in place. Test f/above to 1000 psi. (No test possible f/below.) 08:00 - 10:00 2.00 WHSUB P DECOMP ND tree. 10:00 - 13:00 3.00 BOPSU P DECOMP NU BOP stack. 13:00 - 13:30 0.50 BOPSU P DECOMP Prepare f/BOP test. Fill stack and check f/leaks. 13:30 - 20:30 7.00 BOPSU P DECOMP Test BOPS 250/3500 psi low/high pressure. Test witnessed by Larry Wurdeman/Biff Perry NAD toolpushers, Mike Dinger, Lowell Anderson BP WSLs. Bob Noble AOGCC waived AOGCC presence during testing. Tests 1-11 w/4" test jt. in place. 1. Top rams, choke valves 1,2,3,16, HCR kill, dart valve, top drive upper IBOP. 2. Top pipe rams, choke valves 4,5,6, manual kill, manual IBOP. 3. Choke vavles 7,8,9, TIW. (Choke valve # 9leaking--rebuild #9). 4. Super choke and manual (B) choke. 5. Choke valves 10, 11, 15. 6. Choke valve 14. 7. HCR choke. 8. Manual choke. 9. Annular preventer tested to 3500 psi. 10. Retest choke valve # 9 after rebuilding it. rrinted: a2uzuuu iao:5i rm BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABORS 7ES Rig Number: i ~ Date From - To Hours Task Code NPT Phase j Description of Operations 3/24/2008 13:30 - 20:30 7.00 BOPSU P DECOMP 11. Koomey test: System pressure after closure = 1700 psi. 17 sec to 200 psi increase/1 min 24 sec to full recovery system pressure at 3000 psi. 1875 psi average nitrogen bottle charge pressure. Test w/4.5" test jt: 12. Top pipe rams w/4.5" jt. 20:30 - 22:00 1.50 BOPSU P DECOMP RU Drill Site Maintenance Lubricator. Test to 200 psi. Check IA--no pressure, no flow. Pull TWC to surface. RD DSM lubricator and clear floor. 22:00 - 23:00 1.00 PULL P DECOMP MU drill pipe jt to 7" IJ4S XO and screw into hanger per FMC. 6.5 turns to right. Back out lock down screws 3.5". Unseat hanger w/140K PU and pull to floor. Control line shielded cable in good shape and attached to hanger. 23:00 - 00:00 1.00 PULL P DECOMP CBU. 623 bbls 8.5 ppg seawater at 10 bpm/480 psi. RU tbg handling equipment and Schlumberger spooler while circulating. 3/25/2008 00:00 - 01:00 1.00 PULL P DECOMP Install 4.5" TDS XO on safety valve and stand back on peg ready f/use. Cut and seal ends of encapsulated control line. LD tubing hanger. MW = 8.5 ppg seawater. 01:00 - 03:00 2.50 PULL P DECOMP Pull and LD 4.5" TDS tubing jts f/surface to 2085'. Spool encapsulated control line. Recover 26 of 26 clamps and 6 of 6 SS bands. 03:00 - 03:30 0.50 PULL P DECOMP LD 4.5" Schlumberger Bal-O SSSV Nipple. RD Schlumberger Spooling Unit. 03:30 - 09:30 6.00 PULL P DECOMP Continue to POOH with 4.5" tubing from 10,215' MD. LD 19.1' cut tubing joint. pulled a total of 255 tubing joints. RD tubing handling equipment, clear and clean the rig floor. 09:30 - 11:00 1.50 BOPSU P DECOMP RU pressure testing equipment and test lower rams to 250 psi low, 3500 psi high. RD testing equipment. Replace rubber on test plug. Install wear bushing. 11:00 - 13:00 2.00 EVAL P DECOMP Service the top drive and drawworks. Slip and cut 126' of drilling line. Adjust brake on drawworks and service crown 13:00 - 17:00 4.00 EVAL P DECOMP PJSM with SLB E-line crew. Spot E-line unit and RU Sheaves. MU 8.52" gauge ring, CCL and gamma ray tool. Unable to work gauge ring past 2573' MD. POOH with E-line and change to 8.5" gauge ring. Unable to work past 2573' MD. Consult with Anchorage team and RD SLB E-line tools and Sheaves. 17:00 - 18:30 1.50 CLEAN P DECOMP Load pipe shed with heavy weight drill pipe and collars. 18:30 - 20:30 2.00 CLEAN P DECOMP PJSM with hands to pick up Baker scraper BHA. PU BHA to include: Bull Nose, Casing Scraper, Bit Sub, Bumper Sub, Jars, 9 Drill Collars, and 15 jts of HWDP. RIH to 758' MD. 20:30 - 22:30 2.00 CLEAN P DECOMP RIH with scraper picking up 4" drill pipe singles to 2573' MD. Worked scraper over trouble spot 3 times (less than 5K bounce on weight indicator first time through). Continue in hole to 3052' MD PU = 87K, SO = 85K. Printed: 4/21/2008 1:16:57 PM BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date ,From - To ~ Hours Task Code NPT Phase Description of Operations 3/25/2008 22:30 - 00:00 1.50 CLEAN P DECOMP Circulate 247 bbls. Paraffin and unkown white substance on bottoms up. Continued to circulate hole clean. POOH with scraper racking back 4" drill pipe. 3/26/2008 00:00 - 01:00 1.00 CLEAN P DECOMP Continue to POOH with scraper racking back drill pipe, jars, drill collars, and heavy weight. 01:00 - 01:30 0.50 CLEAN P DECOMP MU a Baker cleanout BHA with full gauge 8.5" string mill. RIH to 765' MD. BHA detail: Bullnose, Scraper, Bit Sub, Upper Whipstock Mill, Jar, 9 Drill Collars, and 15 HWDP. 01:30 - 07:30 6.00 CLEAN P DECOMP RIH with 8.5" string mill to 10,130' MD picking up 4" drill pipe singles. No problems while running through previous tight spot at 2573' MD. 07:30 - 09:30 2.00 CLEAN P DECOMP Circulate a 40 bbls high vis sweep. 543 gpm, 2660 psi. PU 190K, SO 120K. Monitor well. 09:30 - 13:00 3.50 CLEAN P DECOMP POOH with string mill to 764' MD racking back stands of drill pipe. 13:00 - 14:00 1.00 CLEAN P DECOMP PJSM, rack back heavy weight pipe and drill collars. LD string mill and casing scraper. 14:00 - 18:30 4.50 EVAL P DECOMP PJSM with SLB E-line crew and rig hands. RU E-line and RIH with 8.5" gauge ring, junk basket, CCL and gamma ray to 10,150' MD. Log from 10,150' to 9500' MD. POOH with E-line. Junk basket contained a small amount of paraffin and a 1" x 6" piece of rubber. 18:30 - 20:30 2.00 DHB P DECOMP MU a 9-5/8" Halliburton EZSV bridge plug. RIH with EZSV, CCL and gamma ray on E-line to 9950' MD. Tie depths into previous E-line run and set EZSV. Top of EZSV at 9848' MD. 20:30 - 22:30 2.00 DHB P DECOMP POOH with E-line and rig down. 22:30 - 00:00 1.50 DHB P DECOMP PJSM with Halliburton and rig crew. MU Halliburton RTTS and RIH on 4" drillpipe stands to 2475' MD. 3/27/2008 00:00 - 12:00 12.00 DHB P DECOMP RIH with a Halliburton RTTS to track down leak in the 9-5/8" casing. Set RTTS at the following depth with all test to 3500 psi: 3519' MD: above good test for 30 minutes, below 400 psi bleed off in 10 minutes. 5049' MD: above good test for 10 minutes. 7528' MD: above good test for 30 minutes, below 800 psi bleed off in 10 minutes. 8580' MD: above good test for 10 minutes, below 1000 psi bleed off in 10 minutes. 9248' MD: above good test for 10 minutes, below 700 psi bleed off in 5 minutes. 9821' MD: below good test for 10 minutes. 9535' MD: above good test for 30 minutes, below 900 psi bleed off in 5 minutes. Printed: 4/21/2008 1:16:57 PM BP EXPLORATION Page 4 of 14 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ~~~ From - To 3/27/2008 00:00 - 12:00 12:00 - 15:00 15:00 - 15:30 15:30 - 16:30 16:30 - 00:00 3/28/2008 100:00 - 03:00 03:00 - 06:30 06:30 - 08:30 08:30 - 09:00 09:00 - 13:30 13:30 - 14:00 14:00 - 15:30 E~. `~$ 15:30 - 00:00 E-10 E-10 Spud Date: REENTER+COMPLETE Start: 3/23/2008 End: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 NABOBS 7ES Rig Number: Hours Task Code NPT Phase Description of Operations 12.00 DHB P DECOMP Conclusion: 9-5/8" casing leak is between 9535' and 9821' MD. 9-5/8" casing holds pressure to 3500 psi for 30 minutes from 9535' MD to surface. 3.00 DHB P DECOMP POOH with RTTS and rack back 4" drillpipe to 2379' MD. 0.50 DHB P DECOMP Perform a well kill drill with rig hands. Blow down lines. 1.00 DHB P DECOMP Continue out of hole. Rack back heavy weight drill pipe and lay down RTTS. 7.50 EVAL P DECOMP PJSM to RU SLB E-line. Spot E-line unit and rig up sheaves. MU and RIH with corrosion logging tool. Log from 9848' MD to 4000' in corrosion mode. 3.00 EVAL P DECOMP Continue to log in corrosion mode from 4000' to surface with SLB E-line. RD E-line and clear the floor. Wrap wellhead in herculite and apply steam in preparation for packoff change out. 3.50 WHSUR P DECOMP Rig up to change out 9-5/8" casing packoffs. Pull the wear bushing and pick up packoff running tool. J into casing packoff and backout the lockdown screws. Pick up 15K and work bails to free packoff. Pull packoff through stack to rig floor and run in with new packoff. Run in the lockdown screws and test packoff to 3500 psi for 30 minutes. Lay down the running tool and install the wear bushing. 2.00 STWHIP P WEXIT Clear the rig floor and rig up to run Whipstock. MU and RIH with the following Whipstock BHA to 1324': anchor, slide, window mill, lower mill, flex joint, upper mill, 1 jt HWDP, float sub, MWD w/UBHO, bumper sub, 9 drill collars, and 15jts of HWDP. 0.50 STWHIP P WEXIT Shallow hole test the MWD at 1324' MD. 500 GPM, 670 psi. Blow down the top drive and continue to trip in hole. 4.50 STWHIP P WEXIT Trip in hole with Whipstock BHA on 4" drill pipe stands to 9733' MD. Fill drill pipe every 30 stands. PU 176K, SO 142K. 0.50 STWHIP P WEXIT Bring on pumps and obtain MWD signals. Orient the Whipstock to 22 degrees right of high side. RIH and set bottom trip anchor with 20K. Pick up with 10K overpull to confirm anchor set. Set down 45K under slack off weight to shear mills from slide. Top of EZSV C~ 9838' MD. 1.50 STWHIP P WEXIT Pump a 50 bbl spacer and displace the well to 10.4 ppg LSND milling fluid. 500 GPM, 2240 psi. Obtain slow pump rates at 9807' MD, 7621' ND. 8.50 STWHIP P WEXIT Mill 8.5" window pumping 25 bbl Super Sweeps as needed. Printed: 4/21/2008 1:16:57 PM BP EXPLORATION Page 5 of 14 Operations Surnmary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours j Task .Code NPT Phase Description of Operations 3/28/2008 15:30 - 00:00 ~ 8.50 STW H I P ~ P 3/29/2008 00:00 - 09:30 9.50 STW H I P ~ P 09:30 - 10:30 1.00 STWHIP P 10:30 - 14:00 3.50 STWHIP P 14:00 - 15:30 1.50 STWHIP P 15:30 - 16:30 1.00 STWHIP P 16:30 - 19:00 2.50 STWHIP P 19:00 - 22:30 3.50 STWHIP P 22:30 - 23:30 1.00 STWHIP P 23:30 - 00:00 0.50 STWHIP P 13/30/2008 100:00 - 12:00 12.00 ~ DRILL ~ P WEXIT 80 RPM, 6K TQ off, 9K TO on, 420 GPM, 2050 psi, 152K ROT WT. Found cement behind window. To of window = 9817' MD bottom of window = 9834' M WEXIT Continue to mill 8.5" window and new formation to 9853' MD TOW=9817' MD, BOW=9834' MD PUW=174K, SOW=142K, ROT WT=155K, WOB=12K 9.4K torque on, 7K torque off, 95 RPM, 420 GPM, 2040 psi. Pumped a final HiVis Super Sweep with minimal steel return in cuttings. Worked mills through window with pumps and rotation x 2 and without pumps and rotation. Window good. Recovered 260 Ibs of metal while milling window. WEXIT Conduct FIT with 10.4 ppg MW to 11.5 ppg EMW with 440 psi surface pressure Rig down, blow down lines WEXIT Pump dry job, POH from 9853' MD to 846' MD WEXIT Rack back HWDP Lay down 9 DC's Lay down milling BHA Upper mill in guage Clean and clear floor of tools WEXIT Pull Wear Ring Rig up and jet stack Function BOP's Blow down lines Install Wear Ring WEXIT PJSM with hands PU 8.5" drilling BHA with 8 1/2" rebuilt DTX619M bit, 1.5 degree bent housing motor and DIR/GR/RES/PWD. WEXIT RIH to 1212' MD, conduct shallow test with MWD, 450 gpm and 900 psi MWD tested good Continue to RIH to 9429' MD, filling drill pipe every 30 stands WEXIT Cut 102' of drilling line Service Topdrive and Crown Inspect drawworks brakes WEXIT Continue to RIH to 9817' MD Establish clean hole ECD's;Calculated ECD=10.9 ppg PUW=180K, SOW=130K, Rot Wt=150K Torque=6K at 80 rpm Slow pump rates taken at 9817 MD, 7649' TVD Pump 1: 2 bpm=320 psi, 3 bpm=480 psi Pump 2: 2 bpm=320 psi, 3 bpm=480 psi INT1 Drilling 8 1/2" intermediate section to 10,386' MD Backream 30' full stand on connections Monitor shakers for shale cuttings W06=5-10K, GPM=497 psi on=3113, psi off=2962 Printed: nizvzuua i:iti:oi Pnn BP EXPLORATION Page 6 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date 'From - To ,Hours Task Code NPT Phase Description of Operations 3/30/2008 00:00 - 12:00 12.00 DRILL P INT1 PUW=183K, SOW=135K, ROT WT=150K, RPM=80 12:00 - 19:30 7.50 DRILL P INT1 19:30 - 20:30 1.OO DRILL P INT1 20:30 - 21:30 1.001 DRILL P INT1 21:30 - 22:00 0.50 DRILL P INT1 22:00 - 00:00 2.00 DRILL P INT1 3/31/2008 00:00 - 01:30 1.50 DRILL P INT1 01:30 - 02:00 0.50 DRILL N RREP INT1 '~ 02:00 - 05:30 3.50 DRILL P INT1 05:30 - 07:30 2.00 DRILL P INT1 07:30 - 08:00 0.50 DRILL P INT1 08:00 - 09:30 1.50 BOPSU P LNR1 09:30 - 10:00 0.50 BOPSU P LNR1 10:00 - 10:30 0.50 CASE P LNR1 10:30 - 14:00 3.50 CASE P LNR1 ADT=8.3 hrs, AST=4.5 hrs, ART=3.8, JARS=8.3 Continue drilling from 10,386' MD to 10,820' MD Pump HiVis sweep while drilling last stand to TD Control drill to 10,827' MD per Geologist W0B=5-10K, GPM=500 psi on=3360, psi off=3150 PUW=195K, SOW=140K, ROT WT=156K, RPM=80 Torque on=9K, Torque off=7K Actual ECD's=11.2 ppg, never exceeded above .3 ppg of calculated ECD's ADT=5.19 hrs, AST=.67 hrs, ART=4.52 hrs, JARS=13.51 hrs CBU for samples volume 617 bbls at 500 gpm and 3187 psi RPM=80, Torque=7.5K Monitor well, static Short trip from TD to above window at 9811' MD Dry wipe 25K overpulls at 10,525', 10,504', 10,097', 10,021', 9995' Conducted wipe of those areas RIH to TD, no problems Circulate and condition mud in preparation for running 7" liner HiVis sweep brought back very little cuttings POH from TD to window at 9811' No overpulls or tight spots PUW=195K, SOW=14K Air boot on BOP riser failed, causing a leak into cellar. Notified 5700 Change out air boot. Continue POH Note: ACS personnel inspected cellar area and determined the leak to be 15 gallons and non reportable to agencies. Clean up of area was completed after ACS assessment of area by rig crew. LD BHA Bit Grade: 1-1-WT-A-X-1-NO-TD Clear and clean rig floor Pull wear ring Change out top rams to 7" and test at 250 psi low, 3500 psi hiah RD test equipment Install wear ring Blow down lines RU equipment to run 7" liner PJSM with hands, casing crew, Baker rep, Well Site Leader MU and Baker lock float equipment, fill pipe and check floats: floats okay Ran total of 33 jts 7" 26# L-80 BTC-M liner, avg MU Torque 8600 ft/Ibs MU Baker C-2 HMC liner hanger and ZXP packer Printetl: 4/21/2008 1:16:57 PM BP EXPLORATION Page 7 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date ~' From - To ~, Hours Task Code NPT 3/31/2008 10:30 - 14:00 3.50 CASE P 14:00 - 14:30 0.50 CASE P 14:30 - 19:00 4.50 CASE P 19:00 - 20:30 1.50 CASE P 20:30 - 22:30 2.00 CEMT P Spud Date: Start: 3/23/2008 End: Rig Release: 4/9/2008 Rig Number: Phase Description of Operations LNR1 RD casing tools LNRi PU 1 stand 4" DP Circulate 1 1/2 times liner volume (78 bbls) 5bpmat130psi Blow down top drive PUW=55K, SOW=55K LNR1 RIH to 9756'MD, filling every 10 stands PUW=170K, SOW=125K LNR1 CBU 5 bpm at 640 psi LNR1 MU cement head and RIH to 10,827' MD; PU 1 1/2' Stage pumps from 1/2 to 5 bpm 1 bpm=325 psi, 2 bpm=430 psi, 3 bpm=520 psi, 4 bpm=660 psi, 5 bpm=890 psi Full returns with no losses while circulating Held PJSM for cementing with hands, Baker rep, SLB cementers, CH2MHill drivers, Toolpusher, Mud Eng, WSL Note: at 10,780' MD, PUW=200K, SOW=120K 22:30 - 00:00 1.50 CEMT P LNR1 Pressure test cement lines to 4,500 psi Pump 30 bbls of MudPUSH II ~ 11.0 ppg Pum 57 bbls of Class G tail ~ 15.8 Kick plug out, positive indication plug left cement head with tattletale Pump 5bbls clean water, switch over to rig pumps and displace cement as per SLB pumping schedule Slowed pumps to 3 bpm before expected latch with liner wiper plug; 1,653 strokes (96 bbls) to pick up liner wiper plug Stage pumps back up to 5 bpm Bumped at 2,394 total strokes (at 94.8% pump efficiency) (142.8 total bbls) to bump the plug Pressure up to 3000 psi to set Hanger; SO 65K to confirm Bled pressure and check floats; Floats held Break off cementing manifold f/TD head, LD manifold/cementing hoses Full returns throughout cement lob, no losses 14/1 /2008 ~ 00:00 - 01:30 ~ 1.50 ~ CASE ~ P TOP OF 7" LINER at 9458'. 7" shoe at 10,825' LNR1 PU to string weight neutral point, mark, SO to 15K on C2 setting tool and rotate 15 turns Pressure up to 1000 psi w/rig pumps; PU 6' to clear PBR seal f/liner top and place Rotating Dog Sub above liner top extension sleeve Circulate 30 bbls ~ 210 gpm, 575 psi Slowly pick up 9' to expose packer setting dogs Slow pumps to 1 1/2 bpm, SO 60K; Po clear indication of settin acker PU and SO 65K; clear indication that packer set PU clear of liner top w/rotating dog sub slowly Bring pump rate up to 210 gpm PU and make NOGO mark Bring pump rate up to 500 gpm/2190 psi to circulate cement out Nnnted: aizvluuss i:iti:5i rnn ~~ BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations 4/1/2008 00:00 - 01:30 1.50 CASE P LNR1 Approximate 12 bbls cement to surface 01:30 - 02:00 0.50 CASE P LNR1 RD cement head, single joint DP 02:00 - 06:00 4.00 CASE P LNR1 POH, LD liner running tool Clear and clean rig floor 06:00 - 08:30 2.50 CASE P LNR1 PU and rack back 63 joints of 4" DP 08:30 - 09:30 1.00 BOPSU P LNRi Chan a rams from 7" to 3 1/2" x 6" variable 09:30 - 15:30 6.00 BOPSU P LNR1 RU BOP test equipment Pull Wear ring Test BOPE: 250 psi low, 3500 psi high Test with 2 7/8", 4" and 4 1/2" test joints RD test equipment, install wear ring BOPE Test witnessed by AOGCC rep Lou Grimaldi, WSL Duncan Ferguson, Toolpusher Larry Wurderman 15:30 - 16:00 0.50 CASE P LNRi RU test equipment to test 7" liner and 9 5/8" casing , Pressure up to 3500 psi, hold for 30 min (chartedl Test ood 16:00 - 17:00 1.00 DRILL P PROD1 PU BHA 6 1/8" tri-cone bit with 1.83 degree bent motor housing 17:00 - 19:30 2.50 DRILL P PROD1 RIH to 1204' MD Shallow test MWD equipment gpm=240, psi=1004 Continue to RIH to 5984' MD 19:30 - 20:00 0.50 DRILL P PROD1 Service topdrive, blocks and crown Change out clutch assembly on drillers console 20:00 - 22:00 2.00 DRILL P PROD1 RIH to 10,781' MD filling every 30 stands PUW=200K, SOW=115K 22:00 - 00:00 2.00 DRILL P PROD1 Tag cement at 10,743' MD landin collar rill float equipment and cement sliding (no rotation) stop short of drilling through shoe gpm=240, psi=1835 Collar and plug debris across shakers 4/2/2008 00:00 - 03:30 3.50 DRILL P PROD1 Mud swap from 10.4 ppg to LSND Flo-Pro 8.4 ppg 100 bbl clean water rinse followed by 50 bbl HiVis spacer gpm=225, psi=1180 Total bbls pumped=692 03:30 - 04:00 0.50 DRILL P PROD1 Complete drilling out shoe with no rotation to 10,825' MD. Drill new formation to 10 855' MD SPR pump 1: 2 bpm=460 psi, 3 bpm=550 psi SPR pump 2: 2 bpm=430 psi, 3 bpm= 545 psi WOB=10K, gpm=240, RPM=30 psi on=1300, psi off=1225 torque on=6K, torque off=5K PUW=175K, SOW=135K, ROT WT=150K 04:00 - 04:30 0.50 DRILL P PROD1 Conduct FIT FIT: EMW=9.5, surface si=485, volume to ressure up=1.73 bbls TVD=8499', MD=10 855' Held and recorded on chart for 10 min 04:30 - 12:00 7.50 DRILL P PROD1 Drill ahead with 6 1/8" tri-cone bit to 11,303' MD WOB=15K, gpm=250, RPM=60 psi on=1521, psi off=1356 Printed: 4/21/2008 1:16:57 PM C~ BP EXPLORATION Page 9 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date ~ From - To ~' Hours Task Code NPT Phase Description of Operations 4/2/2008 04:30 - 12:00 7.50 DRILL P PROD1 torque on=7K, torque off=5.5K PUW=180K, SOW=135K, ROT WT=155K AST=1.95 hrs, ART=4.17 hrs, ADT=6.12 hrs 12:00 - 21:30 9.50 DRILL P PROD1 Continued drilling from 11,303' to 11,793' MD WOB=15K, gpm=250, RPM=60 psi on=1590, psi off=1380 torque on=8K, torque off=6.5K PUW=200K, SOW=140K, ROT WT=160K AST=4.77 hrs, ART=.97 hrs, ADT=5.74 hrs 21:30 - 23:30 2.00 DRILL P PROD1 Circulate bottoms up. 598 bbls at 250 gpm, 1440 psi torque 6.5K at 60 RPM 23:30 - 00:00 0.50 DRILL P PROD1 Stop circulation, monitor well Well static POH. Mud weight in and out 8.4 ppg. 20K overpull at 11,492' MD, wipe through the area 4/3/2008 00:00 - 04:30 4.50 DRILL P PROD1 POH to 248' MD (BHA) PUW=190K, SOW=142K 04:30 - 05:30 1.00 DRILL P PROD1 Lay Down BHA Clear and clean rig floor Prepare to pick up BHA for next RIH Bit came out of hole approximately 3/16" under guage Bit Grade: 2-4-LT-G-E-3-RG-BHA 05:30 - 05:45 0.25 DRILL P PROD1 PJSM with crew, SLB on loading ADN, picking up new BHA 05:45 - 07:30 1.75 DRILL P PROD1 Pick up 6 1/8" PDC BHA with 1.5 degree bent motor housing and AIM inclination at bit Load nuclear source 07:30 - 08:30 1.00 DRILL P PROD1 RIH to 1100' MD Shallow test MWD with 240 gpm at 800 psi Problems with test; changed setting on Equalizer in software program Test good 08:30 - 12:00 3.50 DRILL P PROD1 RIH to 10,790' MD 12:00 - 13:00 1.00 DRILL P PROD1 Slip and Cut 103' of drilling line Service top drive and crown Inspect brakes and drum 13:00 - 13:30 0.50 DRILL P PROD1 RIH to 11,327' MD Took 25K SOW; cleaned tight area 13:30 - 23:00 9.50 DRILL P PROD1 Wash and ream down to 11,793' MD; used pumps, minimal WOB, no rotation Worked through tight areas, gpm=100, psi=765 Orient to High Side Slide to bottom with 240 gpm, 1345 psi 23:00 - 00:00 1.00 EVAL P PROD1 MAD Pass from 11,793' to 11,600' MD at rate of 300' per hour gpm=240, psi=1375 4/4/2008 00:00 - 01:00 1.00 EVAL P PROD1 Continue to MAD Pass to 11,470' MD gpm=240, psi=1450, rate=300 fUhr 01:00 - 12:00 11.00 DRILL P PROD1 Drill ahead with 6 1/8" PDC bit to 12,320' MD WOB=10K, gpm=245, RPM=60 Printed: 4/21/2008 1:16:57 PM i BP EXPLORATION Page 10 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Cade NPT ~ Phase I Description of Operations __ _ - _- - 4/4/2008 01:00 - 12:00 11.00 DRILL P PROD1 psi on=1660, psi off=1480 12:00 - 00:00 I 12.001 DRILL I P 14/5/2008 ~ 00:00 - 02:30 ~ 2.50 ~ DRILL ~ P 02:30 - 04:30 I 2.001 DRILL I P 04:30 - 06:00 1.50 DRILL P 06:00 - 07:30 1.50 DRILL P 07:30 - 11:00 3.50 DRILL P 11:00 - 13:00 2.00 DRILL P 13:00 - 14:30 1.50 DRILL P 14:30 - 15:00 0.50 DRILL P 15:00 - 18:00 3.00 DRILL P 18:00 - 21:00 3.00 DRILL P torque on=9K, torque off=6K PUW=197K, SOW=135K, ROT WT=157K AST=3.47 hrs, ART=3.38 hrs, ADT=6.85 hrs PROD1 Continue drilling from 12,320' to 12,883' MD WOB=8K, gpm=242, RPM=60 psi on=1680, psi off=1454 torque on=8K, torque off=6K PUW=195K, SOW=130K, ROT WT=155K AST=3.12 hrs, ART=3.17 hrs, ADT=6.29 hrs PROD1 Drill ahead to TD at 13 062' MD er Geolo fists direction J WOB=10K, gpm=250, RPM=60 psi on=1650, psi off=1450 torque on=9K, torque off=6K PUW=195K, SOW=140K, ROT WT=157K AST=.18 hrs, ART=1.30 hrs, ADT= 1.48 PROD1 Pump 40 bbl HiVis (110 funnel vis) sweep, circulate surface to surface MW in and out 8.5 ppg Pipe RPM=100, gpm=245, psi=1590 PROD1 POH; no problems with trip Wiper trip to 7" drilling liner shoe PUW=195K, SOW=135K Service top drive at shoe PROD1 RIH to TD No fill, no problems PROD1 Pump 35 bbl HiVis, weighted sweep (MW=10.0 ppg) Circulate sweep around Monitor shakers for returns gpm=245, psi=1480 PROD1 POH to 7" drilling liner shoe at 10,825' MD ° Drop ball to open CCV POH to 9661' MD PUW=195K, SOW=135K PROD1 Circulate bottoms up Reci rocate CCV across liner to at 9461' M 302 psi at 82 gpm, 1555 psi at 550 gpm PROD1 Monitor well-static Pump dry job, MW=10.0 ppg Drop 2.25" rabbit with 100' wireline attached Blow down top drive PROD1 POH to BHA Drop ball to close CCV Cycle closed at 1673 psi PJSM with crew, SLB to pull nuclear source PROD1 LD BHA and nuclear source Stabilizers and bit guage okay Bit grade: 1-1-CT-G-X-I-WT-TD Clear and clean rig floor RU liner casing tongs PJSM with crew, Baker hands on running liner and using tongs rnntea: aizvzuus iae:oi rnn ~ ~ BP EXPLORATION Page 11 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 7ES Date From - To Hours ' Task 4/5/2008 21:00 - 23:45 2.75~CASE Code N'PT' P 23:45 - 00:00 I 0.251 CASE I P 4/6/2008 100:00 - 06:30 I 6.501 CASE I P 06:30 - 07:30 ~ 1.001 CASE ~ P 07:30 - 09:00 I 1.501 CASE I P 09:00 - 11:00 I 2.001 CEMT I P 11:00 - 12:30 I 1.501 CEMT I P Spud Date: Start: 3/23/2008 End: Rig Release: 4/9/2008 Rig Number: Phase i Description of Operations RUNPRD I PU Float Shoe assembly Baker locked first three connections Checked floats at 5 stands in; floats held RIH with 57 joints of 4.5" production liner to 2375' MD Average collar torque=3400 fUlbs RUNPRD Change elevators PU liner hanger and liner top packer RUNPRD Continue to RIH with 57 joints of 4.5", 12.6#, L-80, IBT-M liner. MU 5"x7" Baker ZXP liner top packer and hanger on a C-2, Cross over to 4" drill pipe and RIH with one stand. Circulate 1 1/2 times the liner volume at 2528'. Continue to RIH to 7" shoe at 10,825' MD on 4" drill pipe stands. Fill pipe every 15 stands. 165K PU, 130K SO.POO RUNPRD Circulate 1-1/2 times the liner and drill pipe volume at the 7" casing shoe. 180 bbls, 545 psi, 211 gpm. RUNPRD RIH from 10,825'to 13,062' MD and tag bottom. PU 180K, SO 135K. RUNPRD MU cement head and PU 2'. Circulate and condition the mud Stage pumps up from 1/2 to 5 bpm. 1 bpm=325 psi, 2 bpm=430 psi, 3 bpm=520 psi, 4 bpm=660 psi, 5 bpm=890 psi. Circulate first annular volume at 3 BPM. Circulate second annular volume at 5 BPM. Held PJSM for cementing with hands, Baker rep, SLB cementers, CH2MHill drivers, Toolpusher, Mud Eng, WSL. RUNPRD Pressure test cement lines to 4,500 psi. Pump 30 bbls of MudPUSH II ~ 10.0 ppg, 5 bpm. Pump 62 bbls 12.5 ppg LiteCrete with Gasblock at 5 bpm. Switch to rig pumps, drop wiper dart (positive indication plug left cement head with tattletale. Displace with 40 bbls 8.4 ppg FloPro pert pill followed by 101 bbls 8.4 ppg mud at 5 bpm. Slowed pumps to 3 bpm before expected latch with liner wiper plug; 1,837 strokes (106.5 bbls) to pick up liner wiper plus. Stage pumps back up to 5 bpm. Slow pumps down to 3 bpm 30 bbls prior to plug bump per SLB pump schedule. 2.444 total strokes (at 95% pump efficiency) (141 total bbls) to Bled pressure and check floats; Floats held. Break off cementing manifold from TD head, LD manifold and cementing hoses. Open TIW on TD head and circulate with top drive. no Pnntetl: 4/21/2008 1:1 ti:Si PM s BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/6/2008 11:00 - 12:30 1.50 CEMT P RUNPRD reciprocated pipe throughout job. 12:30 - 14:30 I 2.001 CEMT I P 14:30 - 16:00 1.50 CEMT P 16:00 - 20:00 4.00 CEMT P 20:00 - 20:45 0.75 CEMT P 20:45 - 21:45 1.00 CEMT P 21:45 - 23:30 1.75 CEMT P 23:30 - 00:00 0.50 CEMT N 4/7/2008 00:00 - 00:30 0.50 CEMT N 00:30 - 01:30 1.00 CASE P Top of 4 1/2" Production Liner at 10,652' MD, shoe at 13,060' MD, PBTD at 12,982' MD. RUNPRD PU to neutral string weight and mark pipe, SO 15K on C-2 setting tool and rotate 20 turns. Pressure up to 1000 psi w/rig pumps; PU 6' to clear PBR seal from liner top and place Rotating Dog Sub above liner top extension sleeve. Circulate 30 bbls ~ 210 gpm, 575 psi. Slowly pick up 9' to expose packer setting dogs, rotate at 20 rpm. Slow pumps to 1 1/2 bpm, SO 60K; no clear indication that packer set. PU and SO 75K; repeat several times. Slowly PU to clear liner top w/rotating dog sub. Bring pump rate up to 210 gpm. PU 20' to clear stinger from liner top and make NOGO mark. Bring pump rate up to 500 gpm/2190 psi to circulate cement out. Reciprocate string 30'+ to cross tool joints and wipe cement. A r xim t 1 I m RUNPRD Displaced well to 8.5 ppg seawater. 485 gpm, 2092 psi, 828 bbls pumped. PU 175K, SO 130K. RUNPRD POOH with 4" drill pipe to 2153' MD. RUNPRD Cut and slip 68' of drilling line. RUNPRD Continue to POOH with 4" drill pipe. LD C-2 running tool. Dog subs sheared, indicating packer set. RUNPRD Clean and clear the rig floor. RU test equipment for 3500 psi casing test. CEMT RUNPRD Wait on cement to reach 1000 psi compresive strength. Stage SLB tools on rig floor for running perforation guns. Hold PJSM with SLB and rig crew. CEMT RUNPRD Continue to wait for cement to reach 1000 psi compresive strength. RUNPRD Pressure test wellbore to 3500 psi for 30 minutes and chart.- RD test equipment and blow down lines. / 01:30 - 02:30 1.00 PERFO P OTHCMP MU 2-7/8", 6 SPF, 2906 Power Jet Omega TCP guns and RIH. PU 40 guns and RIH to 864' MD. 02:30 - 03:00 0.50 PERFO P OTHCMP Change out handling equipment to run 2-7/8" PAC pipe. 03:00 - 05:00 2.00 PERFO P OTHCMP Continue to RIH with pert guns picking up 50 joints of 2-7/8'~ PAC drill pipe to 2406'. Use dog collar on all 50 joints. 05:00 - 05:30 0.50 PERFO P OTHCMP RD PAC handling equipment and RU to RIH on 4" drill pipe. 05:30 - 10:00 4.50 PERFO P OTHCMP RIH 2 7/8" TCP guns on 4" drillpipe stands to 12,980' MD and to PBTD 4 1/2" Liner Landin Collar 10:00 - 11:00 1.00 PERFO P OTHCMP Pick up to 12,970' MD to place guns on depth. PJSM with SLB and rig hands. Run a practice firing sequence followed by the actual firing sequence. Nnrnea: ainizuua iao:ai rm s ~- BP EXPLORATION Page 13 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours i Task ~~ Code NPT Phase ', Description of Operations 4/7/2008 10:00 - 11:00 1.00 ~ PERFOB P OTHCMP I Good indication guns fired 11:00 - 13:00 I 2.001 PERFOBI P 13:00 - 00:00 I 11.001 PERFOBI P 14/8/2008 100:00 - 02:30 2.50 ~ PERFOf3~ P 02:30 - 03:30 I 1.001 RUN 03:30 - 04:30 I 1.001 RUN 04:30 - 19:30 ~ 15.00 ~ BUNCO 19:30 - 21:30 I 2.00 21:30 - 23:30 2.00 23:30 - 00:00 0.50 Perforated Interval: 100' from 12,150' - 12,250' MD~ 630' from 12,340 - 12,970' MD OTHCM POOH to 11,963' (above top perforations). PU Wt = 180K, SO Wt = 135K Circulate bottoms up. 310 gpm, 2536 psi. No gas on bottoms up. Obtain slow pump rates. Blow down top drive. Monitor well: 5 barrel per hour loss rate. OTHCMP PJSM on laying down drill pipe. POOH laying down 4" drill pipe from 11,963' to 3649'. RIH with 14 stands from derrick. Continue pulling out of hole to top of 2-7/8" PAC pipe at 2406'. Change out handling equipment and lay down 2-7/8" Pack pipe. Lost 50 bbls of seawater over 12 hours to formation. OTHCMP POOH with 40 2-7/8" perforating guns. Confirmed that all shots fired. Rig down handling equipment. Clear and clean the rig floor. RUNCMP PJSM. Change out bails and elevators. RU power tongs, compensator and torque turn to run 4.5", 12.6#, 13Cr-80, Vam Top completion RUNCMP Pick up 4.5" landing joint and 4.5" tubing hanger. Run tubing hanger down to tubing spool to ensure it sets properly. Lay down landing joint and hanger. RUNCMP RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion to 10671'. Optimum torque 4440 ft. lbs. Utilize torque turn equipment, compensator, and crummies to start joints. 130K PU, 100K SO. RUNCMP Tag up and SO 8K with WLEG at bottom of liner top extension sleeve 10,667'. PU, spaceout, land tubing hanger with mark from dummy run at rig floor. WLEG 2.0' above tag up point at bottom of liner to extension sleeve. Run in lock down screws. RUNCMP Reverse circulate 330 bbls 8.5 ppg corrosion inhibited seawater to annulus at 3 bpm/160 psi. Pressure 4/9/2008 00:00 - 00:45 0.75 BUNCO RUNCMP Pressure test tubin with ball on seat in RHC-M plug to surface to 3500 psi for 30 mins record on a chart. Bleed tubing ressure to 1500 psi. 00:45 - 01:30 0.75 BUNCO RUNCMP Pressure test 4.5" x 9-5/8" b 7" annulus from surface to S-3 roduction acker to 3500 si for 30 mins w/chart. Bleed off annulus then tubing pressure to 0 psi. 01:30 - 02:00 0.50 BUNCO RUNCMP Pressure annulus to 2410 psi and shear DCK valve in GLM #3. Nnntea: arzvluu~s i:iti:oi rnn • BP EXPLORATION Page 14 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date 'i, From - To , Hours Task Code NPT Phase Description of Operations 4/9/2008 01:30 - 02:00 0.50 BUNCO 02:00 - 03:00 1.00 WHSUR P 03:00 - 05:00 2.00 WHSUR P 05:00 - 09:00 4.00 WHSUR P 09:00 - 10:00 1.00 WHSUR P 10:00 - 11:00 1.00 WHSUR P 11:00 - 12:00 I 1.001 WHSUR I P RUNCMP Pump seawater both ways to ensure that valve is open. WHDTRE FMC install TWC and test to 1000 psi f/below. WHDTRE ND BOP stack and stand back. WHDTRE NU Tubing Head adaptor and Tree. Test tree, adaptor flange and packoff to 5000 psi for 5 mins. with diesel. WHDTRE RU Drill Site Maintenance Lubricator and pull TWC. WHDTRE RU Hot Oil Sevrice lines and test to 3500 psi. Hot Oil reverse ~ circulate 155 bbls of 75 deg F. diesel down IA and allow to U-Tube to tubing. WHDTRE RU Drill Site Maintenance and set BPV. Test to 1000 from below. Ball and rod on seat in XN nipple/RHC-M w/1-3/8" fish neck looking up. Secure well. Release rig at 12:00. Printed: 4/21/2008 1:16:57 PM by _ .__ _ _ Schlumberger t--i urs ~urvev rceport Report Date: 5-Apt-08 Survey 1 DLS Computation Method: Minimum CurvaWre / Li Client: BP Exploration Alaska Vertical Section Azimuth: 268.450° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: E-PAD 1 E-10 ND Reference Datum: Rotary Table Well: E-10 ND Reference Elevation: 59.77 ft relative to MSL Borehole: E-10B Sea Bed /Ground Level Elevation: 30.20 ft relafwe ~ MSL UWIIAPI#: 500292062302 Magnetic Declination: 23.334° Survey Name 1 Date: E-10B /April 5, 2008 Total Field Strength: 57673.081 nT ToR I AHD 1 DDI 1 ERD ratio: 257.469° / 7850.54 ft / 6.465 / 0.868 Magnetic Dip: 80.952° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 30, 2008 Location LaULong: N 70 20 33.624, W 148 39 55.017 Magnetic Declination Model: BGGM 2007 location Grid NIE YIX: N 5976710.000 ftUS, E 664449.000 (tUS North Reference: True North Grid Convergence Angle: +1.25695774° Total Corr Mag North -> True North: +23.334° L~ Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de it ft ft ft ft ft ft de 1100 ft ftUS n7C9An AA ftUS CCAAAA AA AI 7A AA 77 CnA \AI ~ AO 7A GC AA9 Krt_ U•W U.UU U,UU --J=J,// U.UV V.VV V.VV V.VV V.W V.VV V.VV JAI VI IV.VV VV171J•VV I~ IV LV JJ.VG'I Y~ 1''V JJ JJ.V II WRP 29.57 0.00 0.00 -30.20 29.57 0.00 0.00 0.00 0.00 0.00 0.00 5976710.00 664449.00 N 70 20 33.624 W 148 39 55.017 GYD CT CMS 99.24 0.21 239.32 39.47 99.24 0.11 0.13 0.13 -0.07 -0.11 0.30 5976709.93 664448.89 N 70 20 33.623 W 148 39 55.020 199.24 0.40 193.64 139.47 199.24 0.36 0.63 0.61 -0.50 -0.35 0.29 5976709.49 664448.66 N 70 20 33.619 W 148 39 55.027 299.24 0.46 197.89 239.47 299.24 0.59 1.38 1.34 -1.22 -0.56 0.07 5976708.77 664448.47 N 70 20 33.612 W 148 39 55.033 399.24 0.55 204.04 339.46 399.23 0.93 2.27 2.22 -2.04 -0.87 0.10 5976707.94 664448.17 N 70 20 33.604 W 148 39 55.043 499.24 0.82 210.44 439.45 499.22 1.52 3.46 3.41 -3.09 -1.43 0.28 5976706.87 664447.64 N 70 20 33.593 W 148 39 55.059 599.24 0.83 213.93 539.44 599.21 2.31 4.90 4.84 -4.31 -2.20 0.05 5976705.64 664446.90 N 70 20 33.581 W 148 39 55.081 699.24 0.80 220.77 639.43 699.20 3.21 6.32 6.24 -5.44 -3.06 0.10 5976704.49 664446.06 N 70 20 33.570 W 148 39 55.106 799.24 0.63 215.17 739.43 799.20 4.00 7.57 7.48 -6.42 -3.83 0.18 5976703.50 664445.31 N 70 20 33.561 W 148 39 55.129 899.24 0.30 208.61 839.42 899.19 4.46 8.38 8.29 -7.10 -4.27 0.33 5976702.81 664444.8$ N 70 20 33.554 W 148 39 55~ 999.24 0.20 194.27 939.42 999.19 4.64 8.81 8.72 -7.50 -4.44 0.12 5976702.41 664444.72 N 70 20 33.550 W 148 39 55. 1099.24 0.11 168.32 1039.42 1099.19 4.67 9.08 8.95 -7.76 -4.47 0.11 5976702.14 664444.71 N 70 20 33.547 W 148 39 55.147 1199.24 0.14 119.02 1139.42 1199.19 4.55 9.28 9.03 -7.91 -4.34 0.11 5976701.99 664444.84 N 70 20 33.546 W 148 39 55.144 1299.24 0.19 101.54 1239.42 1299.19 4.29 9.57 8.98 -8.01 -4.07 0.07 5976701.91 664445.11 N 70 20 33.545 W 148 39 55.136 1399.24 0.20 84.56 1339.42 1399.19 3.95 9.91 8.85 -8.02 -3.73 0.06 5976701.90 664445.44 N 70 20 33.545 W 148 39 55.126 1499.24 0.20 59.21 1439.42 1499.19 3.62 10.25 8.62 -7.92 -3.41 0.09 5976702.01 664445.76 N 70 20 33.546 W 148 39 55.117 1599.24 0.73 296.35 1539.42 1599.19 4.03 10.88 8.46 -7.55 -3.83 0.86 5976702.37 664445.34 N 70 20 33.549 W 148 39 55.129 1699.24 1.49 275.63 1639.40 1699.17 5.89 12.80 9.13 -7.14 -5.70 0.85 5976702.74 664443.46 N 70 20 33.554 W 148 39 55.183 1799.24 2.05 270.43 1739.35 1799.12 8.96 15.88 11.22 -6.99 -8.78 0.58 5976702.81 664440.38 N 70 20 33.555 W 148 39 55.273 1899.24 3.14 264.91 1839.25 1899.02 13.49 20.41 15.13 -7.22 -13.30 1.12 5976702.49 664435.87 N 70 20 33.553 W 148 39 55.405 1999.24 6.48 255.81 1938.88 1998.65 21.73 28.78 23.25 -8.85 -21.50 3.42 5976700.68 664427.70 N 70 20 33.537 W 148 39 55.645 2099.24 8.66 257.81 2038.00 2097.77 34.63 41.95 36.31 -11.82 -34.33 2.20 5976697.43 664414.94 N 70 20 33.507 W 148 39 56.020 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 1 of 11 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting LatiWde Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS Llytl.L4 1l.UU 'L55.63 273ti.53 11yti.3U 57.34 by.U"L 5J.3L -l5./tf -~U.`J3 2224.24 11.68 256.03 2161.04 2220.81 56.14 63.93 58.23 -16.99 -55.70 2249.24 12.40 257.00 2185.49 2245.26 61.24 69.15 63.43 -18.20 -60.77 2274.24 13.12 257.97 2209.87 2269.64 66.66 74.67 68.94 -19.40 X6.16 2299.24 13.84 258.94 2234.18 2293.95 72.40 80.50 74.75 -20.56 -71.87 2324.24 14.78 259.62 2258.41 2318.18 78.50 86.67 80.91 -21.71 -77.94 2349.24 15.48 259.44 2282.54 2342.31 84.94 93.20 87.41 -22.89 -84.36 2374.24 16.25 259.25 2306.59 2366.36 91.69 100.03 94.22 -24.16 -91.07 2399.24 17.16 259.78 2330.53 2390.30 98.79 107.22 101.39 -25.47 -98.14 2424.24 17.65 259.64 2354.39 2414.16 106.18 114.70 108.85 -26.80 -105.50 2449.24 18.50 259.39 2378.16 2437.93 113.84 122.45 116.59 -28.21 -113.12 2474.24 19.23 259.41 2401.81 2461.58 121.83 130.54 124.66 -29.70 -121.07 2499.24 19.80 259.62 2425.38 2485.15 130.08 138.89 133.00 -31.22 -129.28 2524.24 20.65 259.50 2448.83 2508.60 138.62 147.53 141.63 -32.79 -137.78 2549.24 21.36 259.53 2472.17 2531.94 147.47 156.49 150.58 -34.42 -146.59 2574.24 22.18 259.53 2495.39 2555.16 156.63 165.77 159.84 -36.10 -155.71 2599.24 23.34 259.56 2518.44 2578.21 166.18 175.44 169.50 -37.86 -165.22 2624.24 23.88 259.22 2541.35 2601.12 176.07 185.45 179.51 -39.70 -175.06 2649.24 24.55 259.20 2564.15 2623.92 186.19 195.70 189.75 -41.62 -185.13 2674.24 25.36 259.37 2586.82 2646.59 196.61 206.25 200.30 -43.58 -195.50 2699.24 25.73 259.36 2609.37 2669.14 207.25 217.03 211.07 -45.57 -206.09 2724.24 26.37 259.24 2631.83 2691.60 218.09 228.01 222.05 -47.61 -216.88 2749.24 27.61 259.85 2654.11 2713.88 229.30 239.36 233.38 -49.67 -228.04 2774.24 28.68 260.25 2676.15 2735.92 240.96 251.15 245.17 -51.70 -239.65 2799.24 30.66 260.99 2697.87 2757.64 253.22 263.52 257.53 -53.72 -251.86 2824.24 31.52 262.08 2719.28 2779.05 266.04 276.43 270.41 -55.62 -264.63 2849.24 32.33 263.34 2740.50 2800.27 279.19 289.65 283.59 -57.29 -277.74 2874.24 32.74 264.00 2761.58 2821.35 292.59 303.10 296.98 -58.77 -291.11 2899.24 33.04 264.11 2782.57 2842.34 306.13 316.67 310.50 X0.18 -304.61 2924.24 33.27 264.06 2803.50 2863.27 319.76 330.35 324.12 -61.59 -318.21 2949.24 33.65 264.12 2824.36 2884.13 333.50 344.13 337.85 -63.01 -331.92 2974.24 33.95 264.14 2845.13 2904.90 347.37 358.04 351.71 -64.43 -345.76 2999.24 34.59 263.58 2865.79 2925.56 361.40 372.11 365.74 -65.94 -359.75 3024.24 34.90 263.66 2886.33 2946.10 375.60 386.36 379.96 -67.52 -373.91 3049.24 35.15 263.72 2906.81 2966.58 389.90 400.71 394.27 -69.10 -388.17 3074.24 35.35 263.83 2927.22 2986.99 404.28 415.14 408.67 -70.66 -402.52 3099.24 35.66 264.05 2947.57 3007.34 418.75 429.66 423.16 -72.19 -416.95 3124.24 36.10 264.29 2967.83 3027.60 433.37 444.31 437.78 -73.68 -431.53 3149.24 36.16 263.59 2988.02 3047.79 448.06 459.05 452.49 -75.24 -446.19 3174.24 37.59 263.63 3008.02 3067.79 463.01 474.05 467.47 -76.91 -461.10 3199.24 37.78 263.60 3027.81 3087.58 478.24 489.34 482.73 -78.61 -476.29 Y.3/ 0`J/66U3.17 tl64J`JtS.4J N /U ZU 33.4btf W 74C 37! ~tS.DUb 2.74 5976691.80 664393.69 N 70 20 33.457 W 148 39 56.644 2.99 5976690.47 664388.65 N 70 20 33.445 W 148 39 56.792 3.00 5976689.16 664383.29 N 70 20 33.433 W 148 39 56.950 3.02 5976687.87 664377.61 N 70 20 33.421 W 148 39 57.117 3.82 5976686.59 664371.56 N 70 20 33.410 W 148 39 57.294 2.81 5976685.26 664365.17 N 70 20 33.399 W 148 39 57.481 3.09 5976683.85 664358.49 N 70 20 33.386 W 148 39 57.678 3.69 5976682.39 664351.45 N 70 20 33.373 W 148 39 57.884 1.97 5976680.89 664344.12 N TO 20 33.360 W 148 39 58. 3.41 5976679.31 664336.53 N 70 20 33.346 W 148 39 58 2.92 5976677.65 664328.62 N 70 20 33.332 W 148 39 58. 2.30 5976675.95 664320.44 N 70 20 33.317 W 148 39 58.794 3.40 5976674.20 664311.98 N 70 20 33.301 W 148 39 59.042 2.84 5976672.38 664303.21 N 70 20 33.285 W 148 39 59.299 3.28 5976670.49 664294.13 N 70 20 33.269 W 148 39 59.566 4.64 5976668.53 664284.66 N 70 20 33.251 W 148 39 59.844 2.23 5976666.47 664274.86 N 70 20 33.233 W 148 40 0.131 2.68 5976664.33 664264.84 N 70 20 33.214 W 148 40 0.425 3.25 5976662.14 664254.52 N 70 20 33.195 W 148 40 0.728 1.48 5976659.92 664243.97 N 70 20 33.175 W 148 40 1.038 2.57 5976657.65 664233.23 N 70 20 33.155 W 148 40 1.353 5.08 5976655.35 664222.12 N 70 20 33.135 W 148 40 1.679 4.35 5976653.06 664210.56 N 70 20 33.115 W 148 40 2.018 8.05 5976650.77 664198.39 N 70 20 33.095 W 148 40 2.375 4.11 5976648.60 664185.67 N 70 20 33.077 W 148 40 2.748 4.20 5976646.63 664172.60 N 70 20 33.060 W 148 40 3.131 2.17 5976644.86 664159.27 N 70 20 33.046 W 148 40 3 1.22 5976643.16 664145.80 N 70 20 33.032 W 148 40 3. 0.93 5976641.45 664132.24 N 70 20 33.018 W 148 40 4.313 1.53 5976639.73 664118.56 N 70 20 33.004 W 148 40 4.714 1.20 5976638.01 664104.77 N 70 20 32.990 W 148 40 5.118 2.85 5976636.19 664090.81 N 70 20 32.975 W 148 40 5.527 1.25 5976634.30 664076.69 N 70 20 32.960 W 148 40 5.940 1.01 5976632.41 664062.46 N 70 20 32.944 W 148 40 6.357 0.84 5976630.53 664048.16 N 70 20 32.929 W 148 40 6.776 1.34 5976628.68 664033.76 N 70 20 32.914 W 148 40 7.198 1.85 5976626.87 664019.22 N 70 20 32.899 W 148 40 7.624 1.67 5976625.00 664004.60 N 70 20 32.884 W 148 40 8.052 5.72 5976623.00 663989.73 N 70 20 32.867 W 148 40 8.487 0.76 5976620.97 663974.59 N 70 20 32.850 W 148 40 8.931 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 2 of 11 Commerds Measured Inclination Azimuth Sub•Sea TVD lYD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS SLL4.L4 3249.24 3274.24 3299.24 3324.24 3349.24 3374.24 3399.24 3424.24 3449.24 3474.24 3499.24 3524.24 3549.24 3574.24 3599.24 3624.24 3649.24 3674.24 3699.24 3724.24 3749.24 3774.24 3799.24 3824.24 3849.24 3874.24 3899.24 3924.24 3949.24 3974.24 3999.24 4024.24 4049.24 4074.24 4099.24 4124.24 4149.24 4174.24 4199.24 4224.24 su.sz 38.75 39.15 39.91 40.72 41.69 42.89 43.37 43.86 44.02 44.21 44.38 44.61 44.91 45.21 45.55 45.94 46.16 46.36 46.51 46.40 46.47 46.55 46.26 46.26 46.03 45.85 45.99 45.67 45.76 45.49 45.52 45.62 45.61 45.65 45.66 zos.s/ 263.29 263.22 263.30 263.69 264.08 264.75 264.96 265.32 266.28 267.28 267.32 266.45 264.40 262.90 262.34 261.75 261.60 261.58 261.52 261.39 261.32 261.30 261.20 261.15 261.07 260.98 260.97 261.01 261.08 261.44 261.77 261.98 262.27 262.40 262.51 3U4/.4`J 37U/.Z6 4`J3.5`J ~U4./4 4`Jt3.7L 3067.05 3126.82 509.10 520.32 513.68 3086.49 3146.26 524.75 536.03 529.38 3105.77 3165.54 540.60 551.95 545.28 3124.83 3184.60 556.71 568.12 561.44 3143.64 3203.41 573.13 584.59 577.89 3162.14 3221.91 589.91 601.41 594.68 3180.38 3240.15 606.97 618.50 611.74 3198.48 3258.25 624.18 635.75 628.94 3216.48 3276.25 641.51 653.10 646.24 3234.43 3294.20 658.91 670.50 663.57 3252.33 3270.16 3287.91 3305.57 3323.13 3340.58 3357.93 3375.21 3392.44 3409.67 3426.90 3444.10 3461.34 3478.62 3495.95 3513.33 3530.72 3548.14 3565.60 3583.08 3600.60 3618.10 3635.59 3653.07 3670.55 3312.10 3329.93 3347.68 3365.34 3382.90 3400.35 3417.70 3434.98 3452.21 3469.44 676.36 693.88 711.45 729.09 746.79 764.58 782.46 800.39 818.37 836.36 854.33 872.33 890.29 908.21 926.09 943.90 961.71 979.49 997.24 1014.97 1032.67 1050.41 1068.17 1085.94 1103.72 1121.49 1139.27 1157.06 1174.87 1192.70 687.96 705.48 723.08 740.78 758.57 776.48 794.47 812.54 830.65 848.77 866.89 885.02 903.13 921.19 939.22 957.18 975.14 993.08 1010.97 1028.84 680.95 698.40 715.97 733.66 751.45 769.36 787.36 805.42 823.53 841.65 45.59 262.54 3688.03 45.71 262.52 3705.51 45.65 262.60 3722.97 45.78 262.63 3740.43 45.85 262.75 3757.85 3486.67 3503.87 3521.11 3538.39 3555.72 3573.10 3590.49 3607.91 3625.37 3642.85 3660.37 3677.87 3695.36 3712.84 3730.32 3747.80 3765.28 3782.74 3800.20 3817.62 859.77 877.90 896.01 914.07 932.09 -iSU.:5O -82.17 -84.01 -85.88 -87.71 -89.46 -91.10 -92.63 -94.09 -95.36 -96.34 -97.16 -98.12 -99.52 -101.48 -103.76 -106.24 -108.85 -111.49 -114.15 -116.84 -119.57 -122.31 -125.06 -127.83 -130.62 -4yl.Vy -507.06 -522.67 -538.47 -554.54 -570.92 -587.66 -604.68 -621.87 -639.17 -656.54 -673.98 -691.48 -709.02 -726.61 -744.25 -761.99 -779.80 -797.66 -815.58 -833.50 -851.41 -869.34 -887.24 -905.08 -922.89 950.06 -133.42 -940.64 968.01 -136.24 -958.38 985.94 -139.05 -976.09 1003.84 -141.83 -993.77 1021.70 -144.55 -1011.43 1046.68 1039.54 1064.53 1057.39 1082.39 1075.26 1100.27 1093.13 1118.14 1111.00 1136.01 1128.87 1153.89 1146.75 1171.78 1164.63 1189.67 1182.53 1207.60 1200.46 -147.15 -149.68 -152.12 -154.51 -156.85 -159.18 -161.50 -163.82 -166.12 -168.40 -1029.07 -1046.74 -1064.44 -1082.15 -1099.88 -1117.59 -1135.32 -1153.05 -1170.80 -1188.58 L.L3 oaloola.aa ooaaaa.~c rv /V [U J6.6J3 YY 1484V `J.J/6 1.73 5976616.74 663943.90 N 70 20 32.815 W 148 40 9.830 1.61 5976614.55 663928.33 N 70 20 32.797 W 148 40 10.286 3.05 5976612.34 663912.58 N 70 20 32.779 W 148 40 10.748 3.39 5976610.15 663896.55 N 70 20 32.761 W 148 40 11.217 4.01 5976608.04 663880.22 N TO 20 32.744 W 148 40 11.695 5.13 5976606.04 663863.52 N 70 20 32.728 W 148 40 12.185 2.00 5976604.13 663846.54 N 70 20 32.712 W 148 40 12.682 2.20 5976602.30 663829.39 N 70 20 32.698 W 148 40 13.184 2.74 5976600.65 663812.12 N 70 20 32.686 W 148 40 13. 2.89 5976599.29 663794.78 N 70 20 32.676 W 148 40 14~ 0.69 5976598.08 663777.36 N 70 20 32.668 W 148 40 14.706 2.61 5976596.75 663759.89 N 70 20 32.658 W 148 40 15.217 5.90 5976594.96 663742.38 N 70 20 32.645 W 148 40 15.730 4.41 5976592.62 663724.85 N 70 20 32.625 W 148 40 16.244 2.10 5976589.94 663707.25 N 70 20 32.603 W 148 40 16.759 2.30 5976587.08 663689.58 N 70 20 32.578 W 148 40 17.277 0.98 5976584.08 663671.83 N 70 20 32.553 W 148 40 17.797 0.80 5976581.05 663654.03 N 70 20 32.527 W 148 40 18.319 0.62 5976577.99 663636.18 N 70 20 32.501 W 148 40 18.843 0.58 5976574.91 663618.32 N 70 20 32.474 W 148 40 19.366 0.35 5976571.79 663600.48 N 70 20 32.447 W 148 40 19.889 0.33 5976568.66 663582.61 N 70 20 32.420 W 148 40 20.413 1.20 5976565.52 663564.78 N 70 20 32.393 W 148 40 20.936 0.14 5976562.35 663547.00 N 70 20 32.366 W 148 40 21.457 0.95 5976559.18 663529.26 N 70 20 32.339 W 148 40 21.978 0.77 5976555.99 663511.58 N 70 20 32.311 W 148 40 22. 0.56 5976552.78 663493.91 ~ N 70 20 32.283 W 148 40 23 1.29 5976549.59 663476.27 N 70 20 32.256 W 148 40 23. 0.41 5976546.41 663458.65 N 70 20 32.228 W 148 40 24.048 1.49 5976543.31 663441.06 N 70 20 32.201 W 148 40 24.564 0.95 5976540.32 663423.48 N 70 20 32.176 W 148 40 25.079 0.72 5976537.41 863405.87 N 70 20 32.151 W 148 40 25.596 0.83 5976534.58 663388.23 N 70 20 32.127 W 148 40 26.113 0.40 5976531.80 663370.57 N 70 20 32.103 W 148 40 26.630 0.32 5976529.07 663352.91 N 70 20 32.080 W 148 40 27.148 0.29 5976526.36 663335.25 N 70 20 32.057 W 148 40 27.665 0.48 5976523.64 663317.58 N 70 20 32.034 W 148 40 28.183 0.33 5976520.94 663299.90 N 70 20 32.012 W 148 40 28.701 0.53 5976518.25 663282.21 N 70 20 31.989 W 148 40 29.220 0.44 5976515.58 663264.48 N 70 20 31.967 W 14840 29.739 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) E-10\E-10\E-106\E-1OB Generated 5/7/2008 3:41 PM Page 3 of 11 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 4249.24 4274.24 4299.24 4324.24 4349.24 4374.24 4399.24 4424.24 4449.24 4474.24 4499.24 4524.24 4549.24 4574.24 4599.24 4624.24 4649.24 4674.24 4699.24 4724.24 4749.24 4774.24 4799.24 4824.24 4849.24 4874.24 4899.24 4924.24 4949.24 4974.24 4999.24 5024.24 5049.24 5074.24 5099.24 5424.24 5149.24 5174.24 5199.24 5224.24 45.87 45.70 45.74 45.70 45.78 45.79 45.78 45.83 45.91 45.74 45.89 45.93 45.91 45.97 45.81 45.64 45.27 45.41 45.55 45.38 45.28 45.46 45.46 45.53 45.67 45.40 45.19 45.31 45.04 45.21 45.23 45.05 45.16 45.25 45.47 45.63 45.86 46.10 46.22 45.97 263.09 263.71 264.00 264.86 265.21 265.67 266.06 266.19 266.35 266.47 266.55 266.67 266.74 266.74 266.70 266.61 266.44 266.48 266.47 266.51 266.72 266.90 267.40 267.49 267.57 267.67 267.67 267.66 267.43 267.53 267.35 267.43 267.44 267.65 268.19 268.97 269.94 269.85 269.92 270.05 3775.26 3835.03 1210.56 1225.54 1218.39 -170.61 -1206.39 0.98 5976512.98 663246.73 N 70 20 31.945 W 148 40 30.259 3792.70 3852.47 1228.41 1243.46 1236.31 -172.67 -1224.19 1.90 5976510.53 663228.98 N 70 20 31.925 W 148 40 30.779 3810.15 3869.92 1246.25 1261.36 1254.19 -174.59 -1241.98 0.85 5976508.22 663211.23 N 70 20 31.906 W 148 40 31.299 3827.61 3887.38 1264.11 1279.26 1272.08 -176.32 -1259.80 2.47 5976506.10 663193.46 N 70 20 31.889 W 148 40 31.819 3845.05 3904.82 1281.98 1297.16 1289.96 -177.87 -1277.63 1.05 5976504.16 663175.67 N 70 20 31.873 W 148 40 32.341 3862.49 3922.26 1299.87 1315.08 1307.84 -179.30 -1295.50 1.32 5976502.34 663157.84 N 70 20 31.859 W 148 40 32.862 3879.92 3939.69 1317.77 1333.00 1325.72 -180.59 -1313.37 1.12 5976500.66 663140.00 N 70 20 31.846 W 148 40 33.384 3897.35 3957.12 1335.68 1350.92 1343.61 -181.80 -1331.25 0.42 5976499.05 663122.15 N 70 20 31.835 W 148 40 33.907 3914.76 3974.53 1353.61 1368.87 1361.51 -182.97 -1349.16 0.56 5976497.49 663104.28 N 70 20 31.823 W 148 40 34.430 3932 18 3991.95 1371.53 1386.80 1379.39 -184.09 -1367.05 0.76 5976495.98 663086.41 N 70 20 31.812 W 148 40 34.953 . 3949.60 4009.37 1389.45 1404.72 1397.27 -185.18 -1384.95 0.64 5976494.50 663068.55 N 70 20 31.801 W 148 40 35~ 3967.00 4026.77 1407.40 1422.68 1415.18 -186.25 -1402.87 0.38 5976493.04 663050.65 N 70 20 31.791 W 148 40 35.999 3984.39 4044.16 1425.35 1440.64 1433.09 -187.28 -1420.80 0.22 5976491.62 663032.75 N 70 20 31.781 W 148 40 36.523 4001.77 4061.54 1443.30 1458.60 1451.01 -188.30 -1438.74 0.24 5976490.20 663014.84 N 70 20 31.770 W 148 40 37.047 4019.17 4078.94 1461.25 1476.55 1468.91 -189.33 -1456.66 0.65 5976488.78 662996.95 N 70 20 31.760 W 148 40 37.570 4036.63 4096.40 1479.14 1494.45 1486.76 -190.37 -1474.53 0.73 5976487.35 662979.11 N 70 20 31.750 W 148 40 38.092 4054.16 4113.93 1496.94 1512.27 1504.54 -191.45 -1492.31 1.56 5976485.88 662961.35 N 70 20 31.739 W 148 40 38.612 4071.74 4131.51 1514.72 9530.05 1522.29 -192.55 -1510.06 0.57 5976484.39 662943.63 N 70 20 31.729 W 148 40 39.130 4089.27 4149.04 1532.53 1547.88 1540.07 -193.64 -1527.85 0.56 5976482.90 662925.87 N 70 20 31.718 W 148 40 39.650 4106.80 4166.57 1550.34 1565.70 1557.86 -194.74 -1545.64 0.69 5976481.42 662908.12 N 70 20 31.707 W 148 40 40.170 4124.37 4184.14 1568.11 1583.48 1575.60 -195.79 -1563.39 0.72 5976479.98 662890.40 N 70 20 31.697 W 148 40 40.688 4141.94 4201.71 1585.89 1601.27 1593.35 -196.78 -1581.15 0.88 5976478.60 662872.66 N 70 20 31.687 W 148 40 41.207 4159.47 4219.24 1603.71 1619.09 1611.12 -197.66 -1598.95 1.43 5976477.33 662854.89 N 70 20 31.678 W 148 40 41.727 4177.00 4236.77 1621.54 1636.92 1628.89 -198.46 -1616.76 0.38 5976476.14 662837.10 N 70 20 31.670 W 148 40 42.247 4194.49 4254.26 1639.39 1654.78 1646.70 -199.23 -1634.60 0.60 5976474.98 662819.28 N 70 20 31.663 W 148 40 42.769 4212.00 4271.77 1657.24 1672.62 1664.49 -199.97 -1652.43 1.12 5976473.85 662801.47 N 70 20 31.655 W 148 40 43.289 4229.59 4289.36 1675.00 1690.39 1682.20 -200.69 -1670.18 0.84 5976472.74 662783.74 N 70 20 31.648 W 148 40 43.808 4247.19 4306.96 1692.75 1708.15 1699.90 -201.41 -1687.92 0.48 5976471.63 662766.02 N 70 20 31.641 W 148 40 44 4264.81 4324.58 1710.48 1725.88 1717.58 -202.17 -1705.64 1.26 5976470.48 662748.33 N 70 20 31.633 W 148 40 ~ 44 4282.45 4342.22 1728.20 1743.59 1735.25 -202.95 -1723.34 0.74 5976469.31 662730.65 N 70 20 31.626 W 148 40 45.361 4300.06 4359.83 1745.94 1761.34 1752.95 -203.74 -1741.07 0.52 5976468.13 662712.95 N 70 20 31.618 W 148 40 45.879 4317.69 4377.46 1763.66 1779.06 1770.62 -204.55 -1758.77 0.75 5976466.94 662695.27 N 70 20 31.610 W 148 40 46.396 4335.34 4395.11 1781.37 1796.77 1788.29 -205.34 -1776.46 0.44 5976465.75 662677.60 N 70 20 31.602 W 148 40 46.913 4352.95 4412.72 1799.10 1814.51 1805.98 -206.10 -1794.19 0.70 5976464.61 662659.89 N 70 20 31.595 W 148 40 47.430 4370.52 4430.29 1816.89 1832.30 1823.72 -206.75 -1811.96 1.77 5976463.57 662642.14 N 70 20 31.588 W 148 40 47.950 4388.03 4447.80 1834.74 1850.14 1841.50 -207.19 -1829.80 2.32 5976462.74 662624.31 N 70 20 31.584 W 148 40 48.471 4405.47 4465.24 1852.64 1868.05 1859.31 -207.36 -1847.71 2.93 5976462.18 662606.42 N 70 20 31.582 W 148 40 48.994 4422.85 4482.62 1870.61 1886.03 1877.18 -207.39 -1865.69 0.99 5976461.75 662588.45 N 70 20 31.582 W 148 40 49.519 4440.16 4499.93 1888.64 1904.06 1895.10 -207.43 -1883.72 0.52 5976461.32 662570.42 N 70 20 31.581 W 148 40 50.046 4457.50 4517.27 1906.64 1922.07 1913.01 -207.43 -1901.73 1.07 5976460.92 662552.41 N 70 20 31.581 W 148 40 50.572 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) E-10\E-10\E-1OB\E-106 Generated 5/7/2008 3:41 PM Page 4 of 11 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing EasGng Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 5Y49.Z4 45.tf8 'L/U.7U 44/4.tiy 4534.6ti 7y14.1iU ly4U.U3 7y3U.Sti -"LU/.47 -7y1y.6`,i U.35 Dy/d40UA0 uozas4.4o rv IU N S7.aai nr 7484V ~l.Uy/ 5274.24 46.09 270.12 4492.26 4552.03 1942.57 1958.01 1948.74 -207.38 -1937.67 0.80 5976460.19 662516.48 N 70 20 31.582 W 148 40 51.622 5299.24 45.89 270.19 4509.63 4569.40 1960.54 1976.00 1966.61 -207.33 -1955.65 0.82 5976459.84 662498.51 N 70 20 31.582 W 148 40 52.147 5324.24 45.96 270.22 4527.02 4586.79 1978.50 1993.96 1984.47 -207.26 -1973.61 0.29 5976459.51 662480.55 N 70 20 31.583 W 148 40 52.672 5349.24 45.85 270.46 4544.41 4604.18 1996.44 2011.91 2002.31 -207.16 -1991.57 0.82 5976459.22 662462.60 N 70 20 31.584 W 148 40 53.196 5374.24 45.48 270.70 4561.88 4621.65 2014.31 2029.79 2020.08 -206.98 -2009.45 1.63 5976459.01 662444.72 N 70 20 31.585 W 148 40 53.719 5399.24 45.47 270.74 4579.42 4639.19 2032.12 2047.62 2037.79 -206.75 -2027.27 0.12 5976458.84 662426.90 N 70 20 31.588 W 148 40 54.239 5424.24 45.61 270.77 4596.93 4656.70 2049.95 2065.46 2055.51 -206.52 -2045.11 0.57 5976458.69 662409.06 N 70 20 31.590 W 148 40 54.761 5449.24 45.68 270.77 4614.40 4674.17 2067.81 2083.34 2073.27 -206.28 -2062.99 0.28 5976458.54 662391.18 N 70 20 31.592 W 148 40 55.283 5474.24 45.59 270.75 4631.88 4691.65 2085.67 2101.21 2091.03 -206.04 -2080.86 0.36 5976458.38 662373.31 N 70 20 31.594 W 148 40 55.805 5499.24 45.61 270.81 4649.38 4709.15 2103.52 2119.07 2108.78 -205.80 -2098.72 0.19 5976458.23 662355.45 N 70 20 31.597 W 148 40 56~ 5524.24 45.76 270.85 4666.84 4726.61 2121.39 2136.96 2126.56 -205.54 -2116.60 0.61 5976458.10 662337.57 N 70 20 31.599 W 148 40 56. 5549.24 45.77 271.06 4684.28 4744.05 2139.28 2154.87 2144.36 -205.24 -2134.51 0.60 5976458.01 662319.66 N 70 20 31.602 W 148 40 57.372 5574.24 45.90 271.51 4701.70 4761.47 2157.19 2172.80 2162.17 -204.84 -2152.44 1.39 5976458.01 662301.72 N 70 20 31.606 W 148 40 57.896 5599.24 46.09 271.75 4719.07 4778.84 2175.15 2190.78 2180.01 -204.33 -2170.42 1.03 5976458.13 662283.74 N 70 20 31.611 W 148 40 58.421 5624.24 46.41 272.64 4736.35 4796.12 2193.17 2208.84 2197.91 -203.63 -2188.46 2.87 5976458.43 662265.69 N 70 20 31.618 W 148 40 58.948 5649.24 46.66 273.40 4753.55 4813.32 2211.26 2226.99 2215.87 -202.68 -2206.58 2.42 5976458.99 662247.55 N 70 20 31.627 W 148 40 59.478 5674.24 46.94 274.45 4770.67 4830.44 2229.40 2245.21 2233.86 -201.43 -2224.76 3.26 5976459.83 662229.35 N 70 20 31.639 W 148 41 0.009 5699.24 47.19 274.86 4787.70 4847.47 2247.59 2263.52 2251.90 -199.94 -2243.00 1.56 5976460.92 662211.08 N 70 20 31.654 W 148 41 0.542 5724.24 47.38 274.92 4804.65 4864.42 2265.84 2281.88 2269.99 -198.38 -2261.31 0.78 5976462.08 662192.75 N 70 20 31.669 W 148 41 1.076 5749.24 47.51 274.97 4821.56 4881.33 2284.14 2300.30 2288.13 -196.79 -2279.65 0.54 5976463.27 662174.37 N 70 20 31.685 W 148 41 1.612 5774.24 47.75 274.97 4838.41 4898.18 2302.49 2318.77 2306.33 -195.19 -2298.05 0.96 5976464.46 662155.94 N 70 20 31.701 W 148 41 2.150 5799.24 47.97 274.98 4855.18 4914.95 2320.91 2337.31 2324.60 -193.58 -2316.52 0.88 5976465.67 662137.45 N 70 20 31.716 W 148 41 2.689 5824.24 48.09 275.03 4871.90 4931.67 2339.38 2355.89 2342.92 -191.96 -2335.04 0.50 5976466.88 662118.90 N 70 20 31.732 W 148 41 3.230 5849.24 48.28 275.20 4888.57 4948.34 2357.88 2374.53 2361.28 -190.30 -2353.60 0.91 5976468.13 662100.31 N 70 20 31.748 W 148 41 3.772 5874.24 48.49 275.31 4905.17 4964.94 2376.44 2393.22 2379.69 -188.59 -2372.21 0.90 5976469.44 662081.67 N 70 20 31.765 W 148 41 4.316 5899.24 48.71 275.84 4921.71 4981.48 2395.05 2411.97 2398.16 -186.77 -2390.87 1.82 5976470.85 662062.97 N 70 20 31.783 W 148 41 4.861 5924.24 48.95 275.96 4938.16 4997.93 2413.71 2430.79 2416.67 -184.83 -2409.59 1.03 5976472.37 662044.21 N 70 20 31.802 W 148 41 5. 5949.24 49.15 276.07 4954.55 5014.32 2432.43 2449.67 2435.24 -182.85 -2428.37 0.87 5976473.94 662025.40 N 70 20 31.821 W 148 41 5 5974.24 49.30 276.61 4970.88 5030.65 2451.18 2468.60 2453.85 -180.76 -2447.19 1.74 5976475.62 662006.54 N 70 20 31.842 W 148 41 6. 5999.24 49.57 276.79 4987.13 5046.90 2469.98 2487.60 2472.50 -178.55 -2466.05 1.21 5976477.42 661987.64 N 70 20 31.864 W 148 41 7.058 6024.24 50.09 277.17 5003.26 5063.03 2488.87 2506.70 2491.25 -176.22 -2485.01 2.38 5976479.32 661968.63 N 70 20 31.886 W 148 41 7.612 6049.24 50.19 276.93 5019.28 5079.05 2507.84 2525.89 2510.08 -173.87 -2504.05 0.84 5976481.26 661949.54 N 70 20 31.910 W 148 41 8.168 6074.24 50.13 276.15 5035.30 5095.07 2526.85 2545.08 2528.96 -171.68 -2523.13 2.41 5976483.03 661930.43 N 70 20 31.931 W 148 41 8.725 6099.24 49.92 274.74 5051.36 5111.13 2545.86 2564.24 2547.86 -169.86 -2542.20 4.40 5976484.43 661911.32 N 70 20 31.949 W 148 41 9.282 6124.24 49.18 272.27 5067.58 5127.35 2564.81 2583.27 2566.73 -168.70 -2561.18 8.08 5976485.17 661892.32 N 70 20 31.960 W 148 41 9.837 6149.24 48.91 270.82 5083.97 5143.74 2583.66 2602.15 2585.53 -168.19 -2580.05 4.51 5976485.27 661873.44 N 70 20 31.965 W 148 41 10.388 6174.24 48.68 268.82 5100.44 5160.21 2602.46 2620.95 2604.30 -168.25 -2598.86 6.09 5976484.80 661854.64 N 70 20 31.965 W 148 41 10.938 6199.24 48.13 266.44 5117.04 5176.81 2621.15 2639.65 2622.99 -169.02 -2617.54 7.45 5976483.62 661835.98 N 70 20 31.957 W 148 41 11.483 6224.24 47.86 264.76 5133.77 5193.54 2639.71 2658.23 2641.57 -170.44 -2636.06 5.11 5976481.79 661817.50 N 70 20 31.943 W 148 41 12.024 6249.24 47.39 262.94 5150.62 5210.39 2658.11 2676.69 2660.02 -172.42 -2654.42 5.70 5976479.41 661799.19 N 70 20 31.923 W 148 41 12.561 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 5 of 11 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftU5 OL/4.L4 4/.LI LOL. 1, .710/..7/ .'7GL/.J4 LO/O.J.`7 L0.7.7.U/ LV/O.J.-7 -I/Y.pl -LVIL.VY G.YJ JaIVYI V.VJ ~ Iv .I ..~ v 6299.24 47.50 262.21 5184.51 5244.28 2694.67 2713.45 2696.69 -177.31 -2690.86 1.17 5976473.72 661762.87 N 70 20 31.875 W 148 41 13.625 6324.24 47.72 262.23 5201.36 5261.13 2713.02 2731.92 2715.11 -179.81 -2709.15 0.88 5976470.82 661744.64 N 70 20 31.850 W 148 41 14.159 6349.24 47.75 262.33 5218.18 5277.95 2731.42 2750.42 2733.57 -182.29 -2727.49 0.32 5976467.94 661726.36 N 70 20 31.826 W 148 41 14.695 6374.24 47.54 262.58 5235.02 5294.79 2749.79 2768.89 2752.01 -184.72 -2745.80 1.12 5976465.11 661708.11 N 70 20 31.802 W 148 41 15.230 6399.24 47.69 262.64 5251.87 5311.64 2768.16 2787.36 2770.44 -187.09 -2764.11 0.63 5976462.34 661689.85 N 70 20 31.779 W 148 41 15.765 6424.24 47.94 262.71 5268.66 5328.43 2786.59 2805.89 2788.93 -189.45 -2782.49 1.02 5976459.57 661671.54 N 70 20 31.755 W 148 41 16.302 6449.24 48.21 262.82 5285.36 5345.13 2805.10 2824.49 2807.50 -191.80 -2800.94 1.13 5976456.82 661653.14 N 70 20 31.732 W 148 41 16.841 6474.24 48.86 263.31 5301.92 5361.69 2823.75 2843.22 2826.20 -194.06 -2819.53 2.99 5976454.16 661634.60 N 70 20 31.710 W 148 41 17.384 6499.24 49.33 263.45 5318.29 5378.06 2842.57 2862.11 2845.08 -196.24 -2838.30 1.93 5976451.57 661615.89 N 70 20 31.688 W 148 41 17.932 6524.24. 49.77 263.59 5334.51 5394.28 2861.53 2881.14 2864.09 -198.38 -2857.21 1.81 5976449.01 661597.04 N 70 20 31.667 W 148 41 1 6549.24 50.05 263.60 5350.61 5410.38 2880.58 2900.26 2883.19 -200.52 -2876.21 1.12 5976446.46 661578.08 N 70 20 31.646 W 148 41 19. 6574.24 50.34 263.59 5366.61 5426.38 2899.72 2919.47 2902.38 -202.66 -2895.30 1.16 5976443.90 661559.05 N 70 20 31.625 W 148 41 19.597 6599.24 50.60 263.64 5382.52 5442.29 2918.93 2938.75 2921.65 -204.80 -2914.46 1.05 5976441.33 661539.94 N 70 20 31.604 W 148 41 20.157 6624.24 50.72 264.43 5398.37 5458.14 2938.21 2958.09 2940.97 -206.81 -2933.69 2.49 5976438.90 661520.76 N 70 20 31.584 W 148 41 20.719 6649.24 50.98 264.89 5414.16 5473.93 2957.56 2977.47 2960.35 -208.62 -2952.99 1.77 5976436.67 661501.50 N 70 20 31.566 W 148 41 21.282 6674.24 51.22 265.53 5429.85 5489.62 2976.98 2996.93 2979.81 -210.24 -2972.38 2.21 5976434.62 661482.16 N 70 20 31.550 W 148 41 21.849 6699.24 51.43 265.64 5445.48 5505.25 2996.47 3016.45 2999.33 -211.74 -2991.84 0.91 5976432.70 661462.74 N 70 20 31.535 W 148 41 22.417 6724.24 51.63 265.71 5461.03 5520.80 3016.02 3036.02 3018.90 -213.22 -3011.36 0.83 5976430.79 661443.26 N 70 20 31.521 W 148 41 22.987 6749.24 51.65 265.81 5476.55 5536.32 3035.61 3055.62 3038.50 -214.67 -3030.91 0.32 5976428.91 661423.75 N 70 20 31.506 W 148 41 23.558 6774.24 51.70 265.83 5492.05 5551.82 3055.20 3075.24 3058.11 -216.10 -3050.47 0.21 5976427.06 661404.22 N 70 20 31.492 W 148 41 24.130 6799.24 51.64 265.81 5507.55 5567.32 3074.79 3094.85 3077.73 -217.53 -3070.03 0.25 5976425.20 661384.70 N 70 20 31.478 W 148 41 24.701 6824.24 51.48 265.82 5523.10 5582.87 3094.35 3114.43 3097.31 -218.96 -3089.56 0.64 5976423.34 661365.21 N 70 20 31.464 W 148 41 25.272 6849.24 51.61 265.80 5538.64 5598.41 3113.91 3134.01 3116.88 -220.39 -3109.08 0.52 5976421.48 661345.72 N 70 20 31.450 W 148 41 25.842 6874.24 51.50 265.86 5554.19 5613.96 3133.47 3153.59 3136.46 -221.81 -3128.61 0.48 5976419.63 661326.23 N 70 20 31.436 W 148 41 26.413 6899.24 51.42 265.98 5569.76 5629.53 3153.00 3173.14 3156.02 -223.20 -3148.12 0.49 5976417.81 661306.76 N 70 20 31.422 W 148 41 26.982 6924.24 51.47 266.06 5585.35 5645.12 3172.53 3192.69 3175.57 -224.56 -3167.62 0.32 5976416.03 661287.29 N 70 20 31.409 W 148 41 27.552 6949.24 51.18 266.31 5600.97 5660.74 3192.04 3212.21 3195.09 -225.86 -3187.09 1.40 5976414.30 661267.85 N 70 20 31.396 W 148 41 28.121 6974.24 51.28 266.38 5616.62 5676.39 3211.51 3231.70 3214.58 -227.10 -3206.55 0.46 5976412.63 661248.44 N 70 20 31.383 W 148 41 28~ 6999.24 51.38 266.49 5632.24 5692.01 3231.02 3251.22 3234.10 -228.32 -3226.03 0.53 5976410.99 661228.99 N 70 20 31.371 W 148 41 29.258 7024.24 51.22 266.60 5647.87 5707.64 3250.52 3270.73 3253.61 -229.49 -3245.50 0.73 5976409.39 661209.54 N 70 20 31.360 W 148 41 29.827 7049.24 51.25 266.64 5663.53 5723.30 3270.00 3290.22 3273.10 -230.64 -3264.96 0.17 5976407.82 661190.12 N 70 20 31.348 W 148 41 30.396 7074.24 51.29 266.71 5679.17 5738.94 3289.50 3309.73 3292.60 -231.77 -3284.43 0.27 5976406.26 661170.68 N 70 20 31.337 W 148 41 30.964 7099.24 51.20 266.76 5694.82 5754.59 3308.99 3329.22 3312.09 -232.88 -3303.89 0.39 5976404.72 661151.24 N 70 20 31.326 W 148 41 31.533 7124.24 51.40 266.80 5710.45 5770.22 3328.49 3348.73 3331.60 -233.98 -3323.37 0.81 5976403.20 661131.79 N 70 20 31.315 W 148 41 32.102 7149.24 51.41 266.89 5726.04 5785.81 3348.02 3368.27 3351.14 -235.05 -3342.88 0.28 5976401.69 661112.31 N 70 20 31.305 W 148 41 32.672 7174.24 51.41 266.94 5741.64 5801.41 3367.55 3387.81 3370.68 -236.11 -3362.40 0.16 5976400.22 661092.83 N 70 20 31.294 W 148 41 33.242 7199.24 51.55 267.03 5757.21 5816.98 3387.11 3407.37 3390.23 -237.13 -3381.93 0.63 5976398.76 661073.33 N 70 20 31.284 W 148 41 33.812 7224.24 51.41 267.11 5772.78 5832.55 3406.66 3426.93 3409.79 -238.13 -3401.46 0.61 5976397.33 661053.82 N 70 20 31.274 W 148 41 34.383 7249.24 51.36 267.14 5788.38 5848.15 3426.19 3446.47 3429.32 -239.11 -3420.97 0.22 5976395.92 661034.34 N 70 20 31.264 W 148 41 34.953 7274.24 51.43 267.16 5803.98 5863.75 3445.72 3466.00 3448.85 -240.08 -3440.49 0.29 5976394.52 661014.85 N 70 20 31.255 W 148 41 35.523 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7!2008 3:41 PM Page 6 of 11 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS rcaa.cV .7 I.J.7 LOr.LU .70IA..70 JOr A.JJ JYV:/.LJ J'W:J.JY JYVV.JV -G71.VJ - .vv + vv~vvvv. ~-. ................ •. ... r.. ....r-... .. .-... .. ........... 7324.24 51.38 267.26 5835.19 5894.96 3484.78 3505.07 3487.91 -241.99 -3479.50 0.22 5976391.76 660975.89 N 70 20 31.236 W 148 41 36.663 7349.24 51.22 267.34 5850.82 5910.59 3504.28 3524.58 3507.41 -242.91 -3498.99 0.69 5976390.42 660956.43 N 70 20 31.227 W 148 41 37.232 7374.24 51.19 267.39 5866.48 5926.25 3523.76 3544.06 3526.89 -243.80 -3518.46 0.20 5976389.10 660936.99 N 70 20 31.218 W 148 41 37.801 7399.24 51.25 267.40 5882.14 5941.91 3543.25 3563.55 3546.38 -244.69 -3537.92 0.24 5976387.78 660917.55 N 70 20 31.209 W 148 41 38.369 7424.24 50.92 267.50 5897.84 5957.61 3562.70 3583.00 3565.82 -245.56 -3557.36 1.36 5976386.49 660898.14 N 70 20 31.200 W 148 41 38.937 7449.24 50.70 267.55 5913.64 5973.41 3582.07 3602.38 3585.19 -246.39 -3576.72 0.89 5976385.23 660878.80 N 70 20 31.192 W 148 41 39.503 7474.24 50.83 267.60 5929.45 5989.22 3601.43 3621.74 3604.55 -247.21 -3596.06 0.54 5976383.99 660859.48 N 70 20 31.184 W 148 41 40.068 7499.24 50.93 267.63 5945.23 6005.00 3620.83 3641.14 3623.94 -248.02 -3615.44 0.41 5976382.75 660840.13 N 70 20 31.176 W 148 41 40.634 7524.24 50.87 267.75 5961.00 6020.77 3640.23 3660.54 3643.33 -248.80 -3634.83 0.44 5976381.55 660820.76 N 70 20 31.168 W 148 41 41 7549.24 50.72 267.89 5976.80 6036.57 3659.60 3679.91 3662.70 -249.54 -3654.18 0.74 5976380.39 660801.43 N 70 20 31.161 W 148 41 ~ 41 7574.24 50.33 268.00 5992.69 6052.46 3678.89 3699.21 3681.98 -250.23 -3673.47 1.60 5976379.27 660782.16 N 70 20 31.154 W 148 41 42. 7599.24 50.48 268.01 6008.63 6068.40 3698.16 3718.47 3701.24 -250.90 -3692.72 0.60 5976378.18 660762.93 N 70 20 31.147 W 148 41 42.891 7624.24 50.61 268.01 6024.51 6084.28 3717.46 3737.78 3720.53 -251.57 -3712.01 0.52 5976377.09 660743.66 N 70 20 31.140 W 148 41 43.455 7649.24 50.49 268.09 6040.40 6100.17 3736.76 3757.08 3739.82 -252.23 -3731.31 0.54 5976376.01 660724.39 N 70 20 31.134 W 148 41 44.019 7674.24 50.59 268.03 6056.29 6116.06 3756.07 3776.38 3759.11 -252.88 -3750.60 0.44 5976374.93 660705.12 N 70 20 31.127 W 148 41 44.582 7699.24 50.33 268.00 6072.20 6131.97 3775.34 3795.66 3778.38 -253.55 -3769.87 1.04 5976373.84 660685.87 N 70 20 31.121 W 148 41 45.145 7724.24 50.37 265.99 6088.15 6147.92 3794.59 3814.91 3797.63 -254.56 -3789.09 6.19 5976372.41 660666.68 N 70 20 31.111 W 148 41 45.706 7749.24 50.16 267.97 6104.14 6163.91 3813.80 3834.14 3816.85 -255.57 -3808.28 6.15 5976370.97 660647.51 N 70 20 31.101 W 148 41 46.267 7774.24 49.91 267.95 6120.19 6179.96 3832.96 3853.30 3836.00 -256.25 -3827.43 1.00 5976369.87 660628.38 N 70 20 31.094 W 148 41 46.827 7799.24 50.07 267.95 6136.27 6196.04 3852.11 3872.45 3855.14 -256.94 -3846.57 0.64 5976368.77 660609.27 N 70 20 31.087 W 148 41 47.386 7824.24 50.22 267.95 6152.29 6212.06 3871.30 3891.64 3874.32 -257.62 -3865.75 0.60 5976367.66 660590.11 N 70 20 31.080 W 148 41 47.946 7849.24 50.01 267.97 6168.32 6228.09 3890.48 3910.82 3893.50 -258.31 -3884.92 0.84 5976366.56 660570.96 N 70 20 31.073 W 148 41 48.506 7874.24 49.85 268.01 6184.41 6244.18 3909.62 3929.95 3912.62 -258.98 -3904.04 0.65 5976365.47 660551.86 N 70 20 31.067 W 148 41 49.064 7899.24 49.83 268.01 6200.54 6260.31 3928.72 3949.06 3931.72 -259.64 -3923.13 0.08 5976364.39 660532.79 N 70 20 31.060 W 148 41 49.622 7924.24 49.77 268.07 6216.67 6276.44 3947.82 3968.15 3950.80 -260.30 -3942.22 0.30 5976363.31 660513.72 N 70 20 31.054 W 148 41 50.180 7949.24 49.65 268.16 6232.84 6292.61 3966.88 3987.22 3969.86 -260.92 -3961.28 0.55 5976362.27 660494.68 N 70 20 31.047 W 148 41 50.736 7974.24 49.38 268.21 6249.07 6308.84 3985.90 4006.24 3988.86 -261.52 -3980.28 1.09 5976361.25 660475.70 N 70 20 31.041 W 148 41 51~ 7999.24 49.27 268.22 6265.36 6325.13 4004.86 4025.20 4007.81 -262.12 -3999.23 0.44 5976360.24 660456.76 N 70 20 31.035 W 148 41 51. 8024.24 49.36 268.19 6281.66 6341.43 4023.82 4044.15 4026.76 -262.71 -4018.18 0.37 5976359.23 660437.84 N 70 20 31.029 W 148 41 52.399 8049.24 49.16 268.20 6297.98 6357.75 4042.76 4063.10 4045.69 -263.31 -4037.11 0.80 5976358.22 660418.92 N 70 20 31.023 W 148 41 52.952 8074.24 49.07 268.22 ~63t4:34 6374.11 4061.66 4082.00 4064.58 -263.90 -4056.00 0.37 5976357.22 660400.05 N 70 20 31.018 W 148 41 53.504 8099.24 49.04 268.26' 6330.72 6390.49 4080.54 4100.88 4083.45 -264.48 -4074.88 0.17 5976356.22 660381.19 N 70 20 31.012 W 148 41 54.055 8124.24 48.83 268.24 6347.15 6406.92 4099.39 4119.73 4102.29 -265.05 -4093.72 0.84 5976355.24 660362.37 N 70 20 31.006 W 148 41 54.605 8149.24 48.97 268.24 6363.58 6423.35 4118.23 4138.57 4121.12 -265.63 -4112.55 0.56 5976354.24 660343.56 N 70 20 31.000 W 148 41 55.155 8174.24 48.79 268.22 6380.02 6439.79 4137.06 4157.40 4139.94 -266.21 -4131.37 0.72 5976353.25 660324.75 N 70 20 30.994 W 148 41 55.705 8199.24 48.58 268.27 6396.53 6456.30 4155.84 4176.18 4158.71 -266.79 -4150.14 0.85 5976352.26 660306.00 N 70 20 30.989 W 148 41 56.254 8224.24 48.61 268.30 6413.06 6472.83 4174.59 4194.93 4177.45 -267.35 -4168.89 0.15 5976351.29 660287.28 N 70 20 30.983 W 148 41 56.801 8249.24 48.35 268.31 6429.63 6489.40 4193.31 4213.65 4196.16 -267.90 -4187.60 1.04 5976350.33 660268.59 N 70 20 30.977 W 148 41 57.348 8274.24 48.36 268.29 6446.25 6506.02 4211.99 4232.33 4214.83 -268.46 -4206.27 0.07 5976349.36 660249.93 N 70 20 30.972 W 148 41 57.893 8299.24 48.32 268.27 6462.86 6522.63 4230.67 4251.01 4233.49 -269.02 -4224.94 0.17 5976348.39 660231.28 N 70 20 30.966 W 148 41 58.439 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 7 of 11 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS tS3L4.Z4 4tS.U/ YOtS.J`J 04/07..73 OD3`J.SU 4G4`J.3V 4LOb.04 4GJG. IG -GO.7 AO wC'iJ.~/ ~.vv ~awaYi.•r•s vavc ~c.v~ ~~ rv cv .+v.av ~ •• ~~cs ~ ~ w.ova 8349.24 47.86 268.44 6496.27 6556.04 4267.87 4288.21 4270.67 -270. 07 -4262.13 0.85 5976346.52 660194.13 N 70 20 30.956 W 148 41 59.525 8374.24 47.50 268.50 6513.10 6572.87 4286.36 4306.70 4289.15 -270. 57 -4280.60 1.45 5976345.62 660175.66 N 70 20 30.951 W 148 42 0.065 8399.24 47.26 268.47 6530.03 6589.80 4304.75 4325.09 4307.53 -271. 05 -4299.00 0.96 5976344.73 660157.29 N 70 20 30.946 W 148 42 0.602 8424.24 47.35 268.42 6546.98 6606.75 4323.13 4343.47 4325.89 -271. 55 -4317.36 0.39 5976343.83 660138.94 N 70 20 30.941 W 148 42 1.139 8449.24 47.16 268.41 6563.95 6623.72 4341.49 4361.83 4344.24 -272. 06 -4335.72 0.76 5976342.92 660120.60 N 70 20 30.936 W 148 42 1.675 ~I 8474.24 46.93 268.41 6580.99 6640.76 4359.78 4380.12 4362.53 -272. 57 -4354.01 0.92 5976342.01 660102.33 N 70 20 30.931 W 148 42 2.209 8499.24 46.65 268.41 6598.10 6657.87 4378.01 4398.35 4380.74 -273. 07 -4372.22 1.12 5976341.11 660084.13 N 70 20 30.926 W 148 42 2.741 8524.24 46.39 268.39 6615.30 6675.07 4396.15 4416.49 4398.87 -273. 58 -4390.35 1.04 5976340.20 660066.02 N 70 20 30.920 W 148 42 3.271 8549 24 46.34 268.44 6632.56 6692.33 4414.24 4434.58 4416.95 -274. 08 -4408.44 0.25 5976339.31 660047.95 N 70 20 30.915 W 148 42 3.799 . 8574.24 46.29 268.50 6649.82 6709.59 4432.32 4452.66 4435.02 -274. 56 -4426.51 0.26 5976338.43 660029.89 N 70 20 30.911 W 148 42 ~ 8599.24 45.87 268.55 6667.16 6726.93 4450.33 4470.67 4453.01 -275. 03 -4444.51 1.69 5976337.57 660011.91 N 70 20 30.906 W 148 42 4. I 8624.24 45.83 268.61 6684.58 6744.35 4468.26 4488.60 4470.94 -275. 47 -4462.45 0.24 5976336.73 659993.99 N 70 20 30.901 W 148 42 5.377 8649.24 45.81 268.69 6702.00 6761.77 4486.19 4506.53 4488.86 -275. 89 -4480.37 0.24 5976335.92 659976.08 N 70 20 30.897 W 148 42 5.900 8674.24 45.50 268.80 6719.48 6779.25 4504.07 4524.41 4506.72 -276. 29 -4498.24 1.28 5976335.13 659958.22 N 70 20 30.893 W 148 42 6.422 ', 8699.24 45.52 268.83 6737.00 6796.77 4521.91 4542.25 4524.54 -276. 65 -4516.07 0.12 5976334.37 659940.40 N 70 20 30.889 W 148 42 6.943 8724.24 45.24 268.84 6754.56 6814.33 4539.70 4560.04 4542.32 -277. 02 -4533.87 1.12 5976333.62 659922.62 N 70 20 30.886 W 148 42 7.463 ', 8749.24 44.99 268.84 6772.20 6831.97 4557.41 4577.75 4560.02 -277. 37 -4551.57 1.00 5976332.87 659904.93 N 70 20 30.882 W 148 42 7.980 8774.24 45.02 268.83 6789.87 6849.64 4575.09 4595.43 4577.68 -277. 73 -4569.25 0.12 5976332.13 659887.27 N 70 20 30.879 W 148 42 8.497 8799.24 44.69 268.92 6807.60 6867.37 4592.72 4613.07 4595.30 -278. 08 -4586.88 1.34 5976331.39 659869.65 N 70 20 30.875 W 148 42 9.012 8824.24 44.63 268.91 6825.38 6885.15 4610.30 4630.64 4612.86 -278. 41 -4604.45 0.24 5976330.68 659852.09 N 70 20 30.872 W 148 42 9.525 8849.24 44.67 268.93 6843.16 6902.93 4627.86 4648.21 4630.41 -278. 74 -4622.02 0.17 5976329.96 659834.54 N 70 20 30.868 W 148 42 10.038 8874.24 44.32 268.90 6861.00 6920.77 4645.38 4665.73 4647.92 -279. 08 -4639.53 1.40 5976329.24 659817.03 N 70 20 30.865 W 148 42 10.550 8899.24 44.34 268.89 6878.88 6938.65 4662.85 4683.20 4665.37 -279. 41 -4657.00 0.08 5976328.52 659799.58 N 70 20 30.861 W 148 42 11.060 8924.24 44.21 268.89 6896.78 6956.55 4680.31 4700.65 4682.81 -279. 75 -4674.45 0.52 5976327.80 659782.14 N 70 20 30.858 W 148 42 11.570 8949.24 43.77 268.88 6914.77 6974.54 4697.67 4718.01 4700.16 -280. 09 -4691.81 1.76 5976327.09 659764.80 N 70 20 30.855 W 148 42 12.077 8974.24 43.80 268.85 6932.81 6992.58 4714.97 4735.31 4717.45 -280. 43 -4709.10 0.15 5976326.36 659747.52 N 70 20 30.851 W 148 42 12.582 8999.24 43.71 268.77 6950.87 7010.64 4732.26 4752.60 4734.72 -280. 79 -4726.39 0.42 5976325.63 659730.24 N 70 20 30.847 W 148 42 13~ 9024.24 43.64 268.67 6968.95 7028.72 4749.52 4769.87 4751.98 -281. 18 -4743.65 0.39 5976324.86 659713.00 N 70 20 30.844 W 148 42 13 9049.24 43.49 268.63 6987.07 7046.84 4766.75 4787.10 4769.19 -281. 58 -4760.87 0.61 5976324.08 659695.79 N 70 20 30.839 W 148 42 14.094 9074.24 43.21 268.56 7005.25 7065.02 4783.91 4804.26 4786.35 -282. 00 -4778.03 1.14 5976323.28 659678.64 N 70 20 30.835 W 148 42 14.596 9099.24 43.20 268.51 7023.47 7083.24 4801.03 4821.37 4803.45 -282. 44 -4795.14 0.14 5976322.47 659661.55 N 70 20 30.831 W 148 42 15.095 9124.24 43.17 268.48 7041.70 7101.47 4818.13 4838.48 4820.55 -282. 89 -4812.24 0.15 5976321.64 659644.46 N 70 20 30.826 W 148 42 15.595 9149.24 42.98 268.41 7059.96 7119.73 4835.21 4855.56 4837.62 -283. 35 -4829.31 0.78 5976320.81 659627.41 N 70 20 30.822 W 148 42 16.094 9174.24 43.00 268.32 7078.25 7138.02 4852.26 4872.60 4854.66 -283. 84 -4846.35 0.26 5976319.95 659610.39 N 70 20 30.817 W 148 42 16.591 9199.24 42.87 268.29 7096.55 7156.32 4869.28 4889.63 4871.68 -284 .34 -4863.37 0.53 5976319.07 659593.38 N 70 20 30.812 W 148 42 17.089 9224.24 42.74 268.29 7114.89 7174.66 4886.27 4906.62 4888.66 -284 .85 -4880.35 0.52 5976318.19 659576.42 N 70 20 30.807 W 148 42 17.585 9249.24 42.82 268.32 7133.24 7193.01 4903.25 4923.60 4905.63 -285 .35 -4897.33 0.33 5976317.32 659559.46 N 70 20 30.802 W 148 42 18.080 9274.24 42.44 268.32 7151.64 7211.41 4920.18 4940.53 4922.56 -285 .85 -4914.25 1.52 5976316.45 659542.55 N 70 20 30.797 W 148 42 18.575 9298.24 42.30 268.27 7170.11 7229.88 4937.03 4957.38 4939.40 -286 .35 -4931.09 0.58 5976315.58 659525.73 N 70 20 30.792 W 148 42 19.067 9324.24 42.38 268.27 7188.58 7248.35 4953.87 4974.22 4956.23 -286 .86 -4947.92 0.32 5976314.70 659508.92 N 70 20 30.786 W 148 42 19.558 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 8 of 11 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de R R R ft R R R de 1100 R RUS RUS wn~n cv wnn~ n~ wm~ ne oQ~ an noae 71 1 Z7 ri07RQ1'3 Al RSAd99 1d N 7n 7n 3n 7a1 W Ida d7 7n nd9 t7.Ni27.L9 9L.VY LVO.LV /LVI.IV rLVV.vr Yar v.vr Yaa ~.v~ ~ar...v~ -~....v.. -,w,.. ..... ..... ~..._._. ___.__... ..._ __ __.. _. __ 9374.24 41.94 268.20 7225.68 7285.45 4987.39 5007.74 4989.74 -287.90 -4981.43 0.40 5976312.92 659475.44 N 70 20 30.776 W 148 42 20.537 9399.24 41.91 268.20 7244.28 7304.05 5004.09 5024.44 5006.44 -288.43 -4998.12 0.12 5976312.03 659458.76 N 70 20 30.771 W 148 42 21.025 9424.24 41.59 268.19 7262.93 7322.70 5020.74 5041.09 5023.08 -288.95 -5014.76 1.28 5976311.14 659442.14 N 70 20 30.765 W 148 42 21.511 9449.24 41.57 268.18 7281.64 7341.41 5037.33 5057.68 5039.66 -289.48 -5031.34 0.08 5976310.25 659425.58 N 70 20 30.760 W 148 42 21.995 9474.24 41.34 268.14 7300.37 7360.14 5053.88 5074.23 5056.21 -290.01 -5047.89 0.93 5976309.36 659409.05 N 70 20 30.755 W 148 42 22.479 9499.24 41.13 268.07 7319.17 7378.94 5070.36 5090.71 5072.68 -290.55 -5064.36 0.86 5976308.45 659392.60 N 70 20 30.749 W 148 42 22.960 9524.24 41.29 267.97 7337.98 7397.75 5086.83 5107.18 5089.15 -291.12 -5080.82 0.69 5976307.52 659376.15 N 70 20 30.744 W 148 42 23.441 9549.24 41.16 267.95 7356.78 7416.55 5103.31 5123.66 5105.62 -291.71 -5097.28 0.52 5976306.58 659359.71 N 70 20 30.738 W 148 42 23.922 9574.24 40.72 267.88 7375.67 7435.44 5119.69 5140.04 5122.00 -292.30 -5113.65 1.77 5976305.62 659343.35 N 70 20 30.732 W 148 42 24.400 9599.24 40.63 267.90 7394.63 7454.40 5135.98 5156.33 5138.29 -292.90 -5129.93 0.36 5976304.66 659327.09 N 70 20 30.726 W 148 42 2~ 9624.24 40.37 267.98 7413.64 7473.41 5152.22 5172.57 5154.52 -293.49 -5146.16 1.06 5976303.73 659310.88 N 70 20 30.720 W 148 42 25.349 9649.24 40.26 268.08 7432.70 7492.47 5168.39 5188.74 5170.69 -294.04 -5162.33 0.51 5976302.81 659294.73 N 70 20 30.714 W 148 42 25.822 9674.24 40.16 268.20 7451.79 7511.56 5184.53 5204.88 5186.83 -294.57 -5178.46 0.51 5976301.94 659278.62 N 70 20 30.709 W 148 42 26.293 9699.24 39.70 268.33 7470.96 7530.73 5200.58 5220.93 5202.87 -295.05 -5194.50 1.87 5976301.10 659262.60 N 70 20 30.704 W 148 42 26.761 9724.24 39.48 268.38 7490.23 7550.00 5216.51 5236.86 5218.79 -295.51 -5210.42 0.89 5976300.29 659246.69 N 70 20 30.700 W 148 42 27.227 9749.24 39.09 268.43 7509.58 7569.35 5232.34 5252.69 5234.62 -295.95 -5226.24 1.57 5976299.51 659230.88 N 70 20 30.695 W 148 42 27.689 9774.24 38.76 268.54 7529.03 7588.80 5248.05 5268.40 5250.32 -296.37 -5241.95 1.35 5976298.75 659215.19 N 70 20 30.691 W 148 42 28.148 Tie-In Survey 9799.24 38.83 268.61 7548.51 7608.28 5263.71 5284.06 5265.97 -296.76 -5257.61 0.00 5976298.01 659199.54 N 70 20 30.687 W 148 42 28.605 TOW (Blind) 9817.00 38.80 268.60 7562.35 7622.12 5274.84 5295.19 5277.10 -297.03 -5268.73 0.17 5976297.50 659188.42 N 70 20 30.684 W 148 42 28.930 BOW (Blind) 9834.00 39.24 270.00 7575.56 7635.33 5285.54 5305.90 5287.79 -297.16 -5279.44 5.79 5976297.13 659177.73 N 70 20 30.683 W 148 42 29.243 Inc+Trend 9845.36 39.24 270.00 7584.36 7644.13 5292.73 5313.08 5294.97 -297.16 -5286.62 0.00 5976296.98 659170.54 N 70 20 30.683 W 148 42 29.453 9942.22 36.07 276.00 7661.06 7720.83 5351.65 5372.21 5353.74 -294.17 -5345.65 5.00 5976298.66 659111.47 N 70 20 30.712 W 148 42 31.177 10038.00 33.11 277.00 7739.90 7799.67 5405.48 5426.58 5407.35 -288.04 -5399.67 3.15 5976303.61 659057.33 N 70 20 30.772 W 148 42 32.755 10133.31 32.68 278.00 7819.93 7879.70 5456.60 5478.34 5458.24 -281.28 -5450.99 0.73 5976309.24 659005.88 N 70 20 30.838 W 148 42 34.254 10229.63 30.99 279.00 7901.76 7961.53 5506.63 5529.15 5508.04 -273.79 -5501.23 1.84 5976315.63 658955.49 N 70 20 30.911 W 148 42 35.722 MWD+IFR+MS 10324.54 30.63 279.63 7983.27 8043.04 5554.37 5577.76 5555.57 -265.92 -5549.21 0.51 5976322.44 658907.36 N 70 20 30.988 W 148 42 37.124 10420.74 31.32 281.44 8065.76 8125.53 5602.77 5627.26 5603.76 -256.86 -5597.87 1.20 5976330.43 658858.51 N 70 20 31.077 W 148 42 3 10515.78 30.41 281.17 8147.34 8207.11 5650.31 5676.02 5651.10 -247.30 -5645.69 0.97 5976338.94 658810.50 N 70 20 31.171 W 148 42 3 10611.69 30.46 281.46 8230.03 8289.80 5697.67 5724.61 5698.29 -237.77 -5693.32 0.16 5976347.43 658762.67 N 70 20 31.264 W 148 42 41. 10707.29 30.75 282.38 8312.31 8372.08 5745.00 5773.28 5745.46 -227.71 -5740.95 0.58 5976356.43 658714.84 N 70 20 31.363 W 148 42 42.726 10766.09 30.08 281.87 8363.02 8422.79 5773.93 5803.04 5774.30 -221.46 -5770.05 1.22 5976362.05 658685.61 N 70 20 31.424 W 148 42 43.576 10836.52 31.28 283.50 8423.59 8483.36 5808.75 5838.98 5809.03 -213.56 -5805.10 2.07 5976369.17 658650.39 N 70 20 31.501 W 148 42 44.601 10869.10 36.03 283.60 8450.70 8510.47 5826.18 5857.03 5826.41 -209.33 -5822.65 14.58 5976373.02 658632.76 N 70 20 31.543 W 148 42 45.113 10902.75 41.32 284.64 8476.97 8536.74 5846.42 5878.05 5846.60 -204.19 -5843.03 15.84 5976377.71 658612.27 N 70 20 31.593 W 148 42 45.709 10934.70 43.77 287.81 8500.51 8560.28 5866.98 5899.65 5867.11 -198.14 -5863.76 10.19 5976383.30 658591.41 N 70 20 31.652 W 148 42 46.315 10967.78 43.33 286.98 8524.48 8584.25 5888.53 5922.44 5888.62 -191.33 -5885.51 2.18 5976389.63 658569.52 N 70 20 31.719 W 148 42 46.950 10998.54 43.05 286.50 8546.91 8606.68 5908.52 5943.49 5908.58 -185.27 -5905.67 1.40 5976395.25 658549.23 N 70 20 31.779 W 148 42 47.539 11031.29 43.98 281.40 8570.66 8630.43 5930.24 5966.03 5930.27 -179.84 -5927.55 11.09 5976400.20 658527.25 N 70 20 31.832 W 148 42 48.178 11063.30 44.04 279.16 8593.69 8653.46 5952.01 5988.27 5952.02 -175.87 -5949.43 4.87 5976403.68 658505.29 N 70 20 31.871 W 148 42 48.818 11095.14 43.92 279.39 8616.60 8676.37 5973.72 6010.38 5973.73 -172.31 -5971.25 0.63 5976406.77 658483.40 N 70 20 31.906 W 148 42 49.455 SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-10B Generated 5/7/2008 3:41 PM Page 9 of 11 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Eastlng Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 11126.94 43.47 280.17 8639.59 8699.36 5995.26 6032.35 5995.27 -168.58 -5992.89 2.21 5976410.02 658461.67 N 70 20 31.942 W 148 42 50.088 11159.92 43.01 279.87 8663.62 8723.39 6017.40 6054.94 6017.40 -164.65 -6015.14 1.53 5976413.46 658439.34 N 70 20 31.981 W 148 42 50.738 11190.73 42.23 279.36 8686.29 8746.06 6037.86 6075.80 6037.86 -161.16 -6035.71 2.77 5976416.50 658418.71 N 70 20 32.015 W 148 42 51.339 11223.77 41.90 279.94 8710.82 8770.59 6059.58 6097.94 6059.58 -157.45 -6057.53 1.54 5976419.73 658396.81 N 70 20 32.051 W 148 42 51.976 11255.41 41.32 280.00 8734.47 8794.24 6080.16 6118.95 6080.17 -153.81 -6078.23 1.84 5976422.91 658376.04 N 70 20 32.087 W 148 42 52.581 11285.68 40.81 280.09 8757.30 8817.07 6099.64 6138.84 6099.66 -150.35 -6097.81 1.70 5976425.95 658356.39 N 70 20 32.121 W 148 42 53.153 11317.42 43.70 281.17 8780.79 8840.56 6120.50 6160.18 6120.53 -146.40 -6118.78 9.39 5976429.43 658335.34 N 70 20 32.159 W 148 42 53.766 11350.12 45.10 283.89 8804.15 8863.92 6142.69 6183.05 6142.74 -141.44 -6141.11 7.22 5976433.91 658312.91 N 70 20 32.208 W 148 42 54.418 11381.57 47.51 283.11 8825.88 8885.65 6164.65 6205.79 6164.72 -136.13 -6163.22 7.87 5976438.72 658290.69 N 70 20 32.260 W 148 42 55.064 11412 86 53 50 283 51 8845.77 8905.54 6187.97 6229.92 6188.08 -130.57 -6186.70 19.17 5976443.77 658267.09 N 70 20 32.314 W 148 42 55.7 5O . . . i 11446.33 54.45 284.82 8865.45 8925.22 6214.03 6256.99 6214.18 -123.94 -6212.95 4.25 5976449.81 658240.71 N 70 20 32.379 W 148 42 56w 11477.42 57.37 282.40 8882.88 8942.65 6238.88 6282.74 6239.08 -117.90 -6237.97 11.39 5976455.31 658215.56 N 70 20 32.439 W 148 42 57.248 11509.05 63.99 283.28 8898.36 8958.13 6265.57 6310.30 6265.84 -111.76 -6264.84 21.07 5976460.85 658188.56 N 70 20 32.499 W 148 42 58.033 11541.98 65.61 284.87 8912.38 8972.15 6294.26 6340.09 6294.61 -104.52 -6293.74 6.58 5976467.46 658159.52 N 70 20 32.570 W 148 42 58.878 11572.96 68.20 283.92 8924.53 8984.30 6321.66 6368.59 6322.09 -97.43 -6321.34 8.82 5976473.94 658131.77 N 70 20 32.639 W 148 42 59.684 11604.89 71.47 280.92 8935.54 8995.31 6350.74 6398.56 6351.26 -91.00 -6350.60 13.51 5976479.73 658102.37 N 70 20 32.702 W 148 43 0.539 11638.13 74.35 281.08 8945.31 9005.08 6381.75 6430.33 6382.35 -84.94 -6381.79 8.68 5976485.11 658071.06 N 70 20 32.762 W 148 43 1.451 11668.85 74.60 281.87 8953.53 9013.30 6410.59 6459.92 6411.28 -79.05 -6410.80 2.61 5976490.36 658041.94 N 70 20 32.819 W 148 43 2.298 11700.83 76.93 280.80 8961.39 9021.16 6440.80 6490.92 6441.60 -72.96 -6441.19 7.97 5976495.78 658011.42 N 70 20 32.879 W 148 43 3.186 11733.08 79.70 278.87 8967.93 9027.70 6471.76 6522.50 6472.65 -67.57 -6472.30 10.40 5976500.49 657980.20 N 70 20 32.932 W 148 43 4.095 11755.20 81.65 278.98 8971.51 9031.28 6493.22 6544.33 6494.18 -64.18 -6493.86 8.83 5976503.40 657958.57 N 70 20 32.965 W 148 43 4.725 11785.15 83.59 276.94 8975.36 9035.13 6522.51 6574.03 6523.55 -60.07 -6523.28 9.36 5976506.86 657929.08 N 70 20 33.005 W 148 43 5.584 11817.13 86.55 275.75 8978.11 9037.88 6554.07 6605.88 6555.18 -56.55 -6554.94 9.97 5976509.69 657897.35 N 70 20 33.039 W 148 43 6.510 11850.34 89.46 276.95 8979.26 9039.03 6586.94 6639.07 6588.13 -52.88 -6587.92 9.48 5976512.63 657864.29 N 70 20 33.075 W 148 43 7.473 11881.35 89.60 277.49 8979.52 9039.29 6617.59 6670.08 6618.87 -48.98 -6618.68 1.80 5976515.86 657833.45 N 70 20 33.113 W 148 43 8.372 11914.12 89.87 279.13 8979.67 9039.44 6649.87 6702.85 6651.26 -44.24 -6651.11 5.07 5976519.88 657800.94 N 70 20 33.160 W 148 43 9.319 11946.34 89.19 280.34 8979.93 9039.70 6681.47 6735.07 6682.98 -38.80 -6682.86 4.31 5976524.63 657769.07 N 70 20 33.213 W 148 43 10.247 11976.92 88.64 280.79 8980.51 9040.28 6711.36 6765.64 6713.00 -33.19 -6712.92 2.32 5976529.57 657738.90 N 70 20 33.268 W 148 43 1~ 12010.75 89.26 280.38 8981.13 9040.90 6744.43 6799.47 6746.22 -26.98 -6746.17 2.20 5976535.06 657705.53 N 70 20 33.329 W 148 43 1 12043.10 89.84 280.52 8981.38 9041.15 6776.07 6831.81 6778.01 -21.11 -6777.98 1.84 5976540.22 657673.60 N 70 20 33.386 W 148 43 13.026 12072.73 89.74 281.19 8981.49 9041.26 6805.01 6861.44 6807.10 -15.53 X807.08 2.29 5976545.16 657644.38 N 70 20 33.441 W 148 43 13.876 12105.23 89.70 280.53 8981.65 9041.42 6836.75 6893.94 6839.00 -9.41 -6839.00 2.03 5976550.58 657612.34 N 70 20 33.500 W 148 43 14.809 12138.31 91.07 279.67 8981.43 9041.20 6869.15 6927.02 6871.56 -3.61 -6871.56 4.89 5976555.67 657579.66 N 70 20 33.557 W 148 43 15.761 12168.86 92.03 279.05 8980.60 9040.37 6899.13 6957.56 6901.69 1.36 -6901.69 3.74 5976559.97 657549.43 N 70 20 33.606 W 148 43 16.641 12200.87 92.72 280.56 8979.28 9039.05 6930.49 6989.54 6933.21 6.81 X933.21 5.18 5976564.73 657517.81 N 70 20 33.659 W 148 43 17.562 12234.14 92.76 280.86 8977.69 9037.46 6962.96 7022.78 6965.87 12.98 -6965.86 0.91 5976570.18 657485.03 N 70 20 33.720 W 148 43 18.516 12264.77 91.18 282.84 8976.63 9036.40 6992.74 7053.39 6995.84 19.27 -6995.82 8.27 5976575.81 657454.94 N 70 20 33.781 W 148 43 19.391 12297.14 90.01 281.44 8976.30 9036.07 7024.18 7085.75 7027.51 26.08 -7027.46 5.64 5976581.92 657423.16 N 70 20 33.848 W 148 43 20.316 12329.81 90.32 282.19 8976.20 9035.97 7055.97 7118.42 7059.51 32.76 -7059.44 2.48 5976587.91 657391.04 N 70 20 33.913 W 148 43 21.250 12359.87 90.35 281.19 8976.03 9035.80 7085.23 7148.48 7088.98 38.86 -7088.87 3.33 5976593.35 657361.48 N 70 20 33.973 W 148 43 22.110 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 10 of 11 Comments Measured Inclination Azimuth Sub-Sea ND TVp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS IL3`J7.0`J YU.LL LO 1.01 0/.7.0/ :7l/J0.09 I I IO.IJ / IOU.LU / ILU.lO 9x.10 -I I ID.ClV G.VO Ja/VJVV.aa 12426.13 90.25 281.54 8975.73 9035.50 7149.75 7214.74 7153.97 52.17 -7153.78 0.79 5976605.24 12456.07 90.05 280.19 8975.65 9035.42 7178.99 7244.68 7183.42 57.81 -7183.18 4.56 5976610.23 12487.14 90.32 278.61 8975.55 9035.32 7209.50 7275.75 7214.11 62.89 -7213.84 5.16 5976614.63 12520.72 90.66 279.90 8975.26 9035.03 7242.48 7309.33 7247.30 68.29 -7246.98 3.97 5976619.30 12551.29 90.59 278.47 8974.93 9034.70 7272.51 7339.90 7277.52 73.17 -7277.15 4.68 5976623.52 12583.64 89.19 276.84 8974.99 9034.76 7304.44 7372.25 7309.62 77.47 -7309.21 6.64 5976627.12 12615.66 89.02 276.75 8975.49 9035.26 7336.12 7404.26 7341.45 81.26 -7341.00 0.60 5976630.21 12647.04 88.74 277.88 8976.10 9035.87 7367.12 7435.64 7372.61 85.26 -7372.12 3.71 5976633.53 12678.73 88.33 275.97 8976.91 9036.68 7398.45 7467.32 7404.10 89.08 -7403.57 6.16 5976636.65 12711.28 88.67 274.80 8977.77 9037.54 7430.75 7499.86 7436.53 92.13 -7435.96 3.74 5976639.00 12742.28 88.47 275.94 8978.54 9038.31 7461.51 7530.85 7467.42 95.03 -7466.82 3.73 5976641.22 12774.36 88.33 273.73 8979.44 9039.21 7493.38 7562.91 7499.41 97.73 -7498.77 6.90 5976643.22 12807.36 88.74 272.29 8980.28 9040.05 7526.26 7595.90 7532.37 99.47 -7531.71 4.54 5976644.23 12837.62 90.15 273.98 8980.57 9040.34 7556.42 7626.16 7562.60 101.12 -7561.92 7.27 5976645.22 12870.53 90.15 274.31 8980.49 9040.26 7589.17 7659.07 7595.45 103.50 -7594.75 1.00 5976646.88 12902.89 90.25 271.80 8980.37 9040.14 7621.42 7691.43 7627.78 105.22 -7627.06 7.76 5976647.89 12933.83 90.22 273.16 8980.25 9040.02 7652.28 7722.37 7658.71 106.56 -7657.97 4.40 5976648.55 12966.11 90.05 271.81 8980.17 9039.94 7684.48 7754.65 7690.97 107.96 -7690.22 4.22 5976649.25 Last Survey 12998.41 90.08 273.33 8980.13 9039.90 7716.70 7786.95 7723.26 109.41 -7722.48 4.71 5976649.99 TD (Projected) 13062.00 90.08 273.33 8980.05 9039.82 7780.06 7850.54 7786.79 113.10 -7785.97 0.00 5976652.29 Survey Type: Definitive Survey NOTES: GYD CT CMS - (Gyrodata -cont. casing m/s - Gyrodata multishot surveys with continuous toll (RGS•CT) in casing. OD 13-3/8" or less. lNC+TREND - (Inclinometer + known azi trend -Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azi muth in known quadrant)" model. MWD + IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Les~al Description: Northing (Y) [ftUSJ Easting (X) [ftUS] Surface : 4926 FSL 501 FEL S6 T1 1N R14E UM 5976710.00 664449.00 BHL : 5035 FSL 3402 FEL S1 T71N R13E UM 5976652.29 656662.98 VJI JJV.GI 1\ IV GV J7.VJJ 657296.30 N 70 20 34.103 W 148 43 24.007 657266.79 N 70 20 34.158 W 148 43 24.866 657236.03 N 70 20 34.208 W 148 43 25.762 657202.79 N 70 20 34.261 W 148 43 26.730 657172.51 N 70 20 34.309 W 148 43 27.612 657140.37 N 70 20 34.351 W 148 43 28.548 657108.50 N 70 20 34.388 W 148 43 29.477 657077.31 N 70 20 34.427 W 148 43 30.386 657045.79 N 70 20 34.464 W 148 43 31.305 657013.34 N 70 20 34.494 W 148 43 3~ 656982.43 N 70 20 34.522 W 148 43 33. 656950.43 N 70 20 34.548 W 148 43 34.087 656917.46 N 70 20 34.565 W 148 43 35.049 656887.22 N 70 20 34.581 W 148 43 35.932 656854.35 N 70 20 34.604 W 148 43 36.891 656822.01 N 70 20 34.620 W 148 43 37.835 656791.08 N 70 20 34.633 W 148 43 38.738 656758.81 N 70 20 34.647 W 148 43 39.680 656726.53 N 70 20 34.661 W 148 43 40.623 656662.98 N 70 20 34.696 W 148 43 42.477 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) E-10\E-10\E-106\E-106 Generated 5/7/2008 3:41 PM Page 11 of 11 .^ ' E-10B 2,194` - 4-1/2" BKR 3.813" ID X Nipple 2,512` - 9-5/8" DV PKR 2,733` - 13-3/8" 72#, L-80, ID-12.347" 9,458` - 7" 26#, L-80 BTC-M Liner Hanger 9,458` 9-5/8" x 7" BKR ZXP PKR 9,817` -TOW 9834' -BOW 9,838` -Top of 9-5/8" EZSV 9,838` -Bottom of 9-5/8" Baker Whipstock TRFF = 6" CMI WELLHEAD= FMC ACTUATOR = AXELSON KB. ELEV = 28.05 BF. ELEV - 27.41 KOP = 2100' Max Angle = 92 degrees Datum MD = - 13,060 - Datum TV D = 8800' SS Minimum ID = 3.725" @ 10654' 4-1 /2" XN NIPPLE CAA S I IFT MA NI~RFI S ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3769 3500 47 KGB2-1 R DOME BK 16 04/19108 2 7348 5910 51 KGB2-1 R SO BK 20 04;19108 1 10272 7998 31 KGB2-1R DMY BK 0 03/31/08 10,559` - 4-1/2" 3.813" ID X Nipple 10,590` - 7" x 4-112" BKR S3 Packer 10,623` - 4-112" 3.813" ID X Nipple 10,654` - 4-1 /2" 3.725" ID XN Nipple 10,667` - W LEG 10,667` - 4-1/2", 12.6#, 13Cr-80 VAMTOP Tubing 10,658' - 7" x 5" ZXP w/10' TBS & Manger (Liner Tap) 10,825` - 7", 26#, L-80, BTC-M Shoe PBTD °- 12,981' MD TD --- 13,060' MD -10,100` -Tubing Cut -12,260` -TOC 13,062' MD - 4-1/2° 12.6#, L-80, IBT-MOD PERFORATION SUMMARY REF LOG: ??????? ANGLE AT TOP PERF: 91 @ 12125' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE Z-~ 6 121 - 12250 O 04/07/08 '?''? 6 12340 - 12970 O 04/07/08 PBTD - j 12718' ~' J 2-7/8" TBG, 6.4#, L-80, .00579 b/pf, ID = 2.441" I 12784' I DATE REV BY COMMENTS DATE REV BY COMMENTS 08/18/81 ORIGINAL COMPLETION 04/10/08 /TLH CORRECTIONS 05/26/99 JAM SIDETRACK(E-10A) 04/26/08 CJWSV GLV CO (04/19/08) 03/05/02 RWTP CORRECTIONS 09/21/06 DRF/PAG SET PLUG, PULL ECLIPSE PKR 07/22/07 JSR/PJC PULL PLUG/ SET LTTP (06/17/07) 04/09/08 N7ES SIDETRACK(E-10B) PRUDHOE BAY UNfr WELL: E-10B PERMIT No: ®2080300 API No: 50-029-20623-02-00 SEC 6, T11 N, R14E, 500' FNL & 353' FEL BP Exploration (Alaska) SCHLUMBERGER Survey report Client .................... BP Exploration Alaska Field ....................: Prudhoe Bay Well .....................: E-10B API number ...............: 50-029-20623-02 Engineer .................: JHudon COUNTY :................... NSB STATE :...................: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: -------------- Mean Sea Level Drillers Depth 32.36 ft NA ft 59.77 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)......... 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 0.00 degrees [(c)2008 IDEAL ID13_OC_06] w d 5-Apr-2008 09:05:08 Page 1 of 15 Spud date ................: 29-Mar-08 Last survey date.........: 05-Apr-08 Total accepted surveys...: 410 MD of first survey.......: 0.00 ft MD of last survey........: 12998.41 ft ----- Geomagnetic data --- Magnetic model...........: Magnetic date ............: Magnetic field strength..: Magnetic dec (+E/W-).....: Magnetic dip .............: ----------------- BGGM version 2007 26-Mar-2008 57672.95 GAMA 23.34 degrees 80.95 degrees ----- MWD survey Reference Criteria ----- ---- Reference G .. ............: 1002.68 meal Reference H .. ............: 57673.00 GAMA Reference Dip ............: 80.95 degrees Tolerance of G...........: (+/-) 2.50 meal Tolerance of H............ (+/-)300.00 GAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 23.34 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 23.34 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUN~ERGER Survey Report 5-Apr-2008 09:05:08 Page 2 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type ---- (deg) ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BP _LTNKNOWN- Depth Only 2 29.57 0.00 0.00 29.57 29.57 0.00 0.00 0.00 0.00 0.00 0.00 BP _UNKNOWN- Depth Only 3 99.24 0.21 239.32 69.67 99.24 -0.07 -0.07 -0.11 0.13 239.32 0.30 BP _GYD CT CMS 4 199.24 0.40 193.64 100.00 199.24 -0.50 -0.50 -0.35 0.61 215.09 0.29 BP GYD CT CMS 5 299.24 0.46 197.89 100.00 299.24 -1.22 -1.22 -0.56 1.34 204.49 0.07 BP _ _GYD CT CMS 6 399.24 0.55 204.04 100.00 399.23 -2.04 -2.04 -0.87 2.22 203.20 0.10 BP _GYD CT CMS 7 499.24 0.82 210.44 100.00 499.22 -3.09 -3.09 -1.43 3.41 204.84 0.28 BP _GYD CT CMS 8 599.24 0.83 213.93 100.00 599.21 -4.31 -4.31 -2.20 4.84 207.02 0.05 BP _GYD CT CMS 9 699.24 0.80 220.77 100.00 699.20 -5.44 -5.44 -3.06 6.24 209.34 0.10 BP _GYD CT CMS 10 799.24 0.63 215.17 100.00 799.20 -6.42 -6.42 -3.83 7.48 210.83 0.18 BP GYD CT CMS 11 899.24 0.30 208.61 100.00 899.19 -7.10 -7.10 -4.27 8.29 211.05 0.33 BP _GYD CT CMS 12 999.24 0.20 194.27 100.00 999.19 -7.50 -7.50 -4.44 8.72 210.64 0.12 BP _GYD CT CMS 13 1099.24 0.11 168.32 100.00 1099.19 -7.76 -7.76 -4.47 8.95 209.91 0.11 BP _GYD CT CMS 14 1199.24 0.14 119.02 100.00 1199.19 -7.91 -7.91 -4.34 9.03 208.73 0.11 BP _GYD CT CMS 15 1299.24 0.19 101.54 100.00 1299.19 -8.01 -8.01 -4.07 8.98 206.94 0.07 BP GYD CT CMS 16 1399.24 0.20 84.56 100.00 1399.19 -8.02 -8.02 -3.73 8.85 204.96 0.06 BP _GYD CT CMS 17 1499.24 0.20 59.21 100.00 1499.19 -7.92 -7.92 -3.41 8.62 203.30 0.09 BP _GYD CT CMS 18 1599.24 0.73 296.35 100.00 1599.19 -7.55 -7.55 -3.83 8.46 206.92 0.86 BP _GYD CT CMS 19 1699.24 1.49 275.63 100.00 1699.17 -7.14 -7.14 -5.70 9.13 218.60 0.85 BP _GYD CT CMS 20 1799.24 2.05 270.43 100.00 1799.12 -6.99 -6.99 -8.78 11.22 231.45 0.58 BP GYD CT CMS 21 1899.24 3.14 264.91 100.00 1899.02 -7.22 -7.22 -13.30 15.13 241.48 1.12 BP _GYD CT CMS 22 1999.24 6.48 255.81 100.00 1998.65 -8.85 -8.85 -21.50 23.25 247.62 3.42 BP _GYD CT CMS 23 2099.24 8.66 257.81 100.00 2097.77 -11.82 -11.82 -34.33 36.31 250.99 2.20 BP _GYD CT CMS 24 2199.24 11.00 255.63 100.00 2196.30 -15.78 -15.78 -50.93 53.32 252.78 2.37 BP _GYD CT CMS 25 2224.24 11.68 256.03 25.00 2220.81 -16.99 -16.99 -55.70 58.23 253.04 2.74 BP GYD CT CMS 26 2249.24 12.40 257.00 25.00 2245.26 -18.20 -18.20 -60.77 63.43 253.33 2.99 BP _GYD CT CMS 27 2274.24 13.12 257.97 25.00 2269.64 -19.40 -19.40 -66.16 68.94 253.66 3.00 BP _GYD CT CMS 28 2299.24 13.84 258.94 25.00 2293.95 -20.56 -20.56 -71.87 74.75 254.04 3.02 BP _GYD CT CMS 29 2324.24 14.78 259.62 25.00 2318.18 -21.71 -21.71 -77.94 80.91 254.44 3.82 BP _GYD CT CMS 30 2349.24 15.48 259.44 25.00 2342.31 -22.89 -22.89 -84.36 87.41 254.82 2.81 BP _GYD CT CMS [(c)2008 IDEAL ID13_OC_ 06] } SCHLUP'~ERGER Survey Report 5-Apr-2008 09:05:08 Page 3 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2374.24 16.25 259.25 25.00 2366.36 -24.16 -24.16 -91.07 94.22 255.14 3.09- BP _GYD CT CMS 32 2399.24 17.16 259.78 25.00 2390.30 -25.47 -25.47 -98.14 101.39 255.45 3.69 BP _GYD CT CMS 33 2424.24 17.65 259.64 25.00 2414.16 -26.80 -26.80 -105.50 108.85 255.75 1.97 BP _GYD CT CMS 34 2449.24 18.50 259.39 25.00 2437.93 -28.21 -28.21 -113.12 116.59 256.00 3.41 BP _GYD CT CMS 35 2474.24 19.23 259.41 25.00 2461.58 -29.70 -29.70 -121.07 124.66 256.22 2.92 BP GYD CT CMS 36 2499.24 19.80 259.62 25.00 2485.15 -31.22 37 2524.24 20.65 259.50 25.00 2508.60 -32.79 38 2549.24 21.36 259.53 25.00 2531.94 -34.42 39 2574.24 22.18 259.53 25.00 2555.16 -36.10 40 2599.24 23.34 259.56 25.00 2578.21 -37.86 41 2624.24 23.88 259.22 25.00 2601.12 -39.70 42 2649.24 24.55 259.20 25.00 2623.92 -41.62 43 2674.24 25.36 259.37 25.00 2646.59 -43.58 44 2699.24 25.73 259.36 25.00 2669.14 -45.57 45 2724.24 26.37 259.24 25.00 2691.60 -47.61 46 2749.24 27.61 259.85 25.00 2713.88 -49.67 47 2774.24 28.68 260.25 25.00 2735.92 -51.70 48 2799.24 30.66 260.99 25.00 2757.64 -53.72 49 2824.24 31.52 262.08 25.00 2779.05 -55.62 50 2849.24 32.33 263.34 25.00 2800.27 -57.29 51 2874.24 32.74 264.00 25.00 2821.35 -58.77 52 2899.24 33.04 264.11 25.00 2842.34 -60.18 53 2924.24 33.27 264.06 25.00 2863.27 -61.59 54 2949.24 33.65 264.12 25.00 2884.13 -63.01 55 2974.24 33.95 264.14 25.00 2904.90 -64.43 56 2999.24 34.59 263.58 25.00 2925.56 -65.94 57 3024.24 34.90 263.66 25.00 2946.10 -67.52 58 3049.24 35.15 263.72 25.00 2966.58 -69.10 59 3074.24 35.35 263.83 25.00 2986.99 -70.66 60 3099.24 35.66 264.05 25.00 3007.34 -72.19 -31.22 -129.28 -32.79 -137.78 -34.42 -146.59 -36.10 -155.71 -37.86 -165.22 -39.70 -175.06 -41.62 -185.13 -43.58 -195.50 -45.57 -206.09 -47.61 -216.88 -49.67 -228.04 -51.70 -239.65 -53.72 -251.86 -55.62 -264.63 -57.29 -277.74 -58.77 -291.11 -60.18 -304.61 -61.59 -318.21 -63.01 -331.92 -64.43 -345.76 -65.94 -359.75 -67.52 -373.91 -69.10 -388.17 -70.66 -402.52 -72.19 -416.95 133.00 256.42 141.63 256.62 150.58 256.79 159.84 256.95 169.50 257.09 179.51 257.22 189.75 257.33 200.30 257.43 211.07 257.53 222.05 257.62 233.38 257.71 245.17 257.83 257.53 257.96 270.41 258.13 283.59 258.34 296.98 258.59 310.50 258.82 324.12 259.05 337.85 259.25 351.71 259.44 365.74 259.61 379.96 259.76 394.27 259.91 408.67 260.04 423.16 260.18 2.30 BP _GYD CT CMS 3.40 BP _GYD CT CMS 2.84 BP _GYD CT CMS 3.28 BP _GYD CT CMS 4.64 BP _GYD CT CMS 2.23 BP _GYD CT CMS 2.68 BP _GYD CT CMS 3.25 BP _GYD CT CMS 1.48 BP _GYD CT CMS 2.57 BP _GYD CT CMS 5.08 BP _GYD CT CMS 4.35 BP _GYD CT CMS 8.05 BP _GYD CT CMS 4.11 BP _GYD CT CMS 4.20 BP _GYD CT CMS 2.17 BP _GYD CT CMS 1.22 BP _GYD CT CMS 0.93 BP _GYD CT CMS 1.53 BP _GYD CT CMS 1.20 BP _GYD CT CMS 2.85 BP _GYD CT CMS 1.25 BP _GYD CT CMS 1.01 BP _GYD CT CMS 0.84 BP _GYD CT CMS 1.34 BP _GYD CT CMS [(c)2008 IDEAL ID13_OC_06] 1 SCHLUNIBERGER Survey Report 5-Apr-2008 09:05:08 Page 4 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 3124.24 36.10 264.29 25.00 3027.60 -73.68 -73.68 -431.53 437.78 260.31 1.85 BP _GYD CT CMS 62 3149.24 36.16 263.59 25.00 3047.79 -75.24 -75.24 -446.19 452.49 260.43 1.67 BP _GYD CT CMS 63 3174.24 37.59 263.63 25.00 3067.79 -76.91 -76.91 -461.10 467.47 260.53 5.72 BP _GYD CT CMS 64 3199.24 37.78 263.60 25.00 3087.58 -78.61 -78.61 -476.29 482.73 260.63 0.76 BP _GYD CT CMS 65 3224.24 38.32 263.37 25.00 3107.26 -80.36 -80.36 -491.59 498.12 260.72 2.23 BP GYD CT CMS 66 3249.24 38.75 263.29 25.00 3126.82 -82.17 -82.17 -507.06 513.68 260.80 1.73 BP _GYD CT CMS i 67 .3274.24 39.15 263.22 25.00 3146.26 -84.01 -84.01 -522.67 529.38 260.87 1.61 BP _GYD CT CMS 68 3299.24 39.91 263.30 25.00 3165.54 -85.88 -85.88 -538.47 545.28 260.94 3.05 BP _GYD CT CMS 69 3324.24 40.72 263.69 25.00 3184.60 -87.71 -87.71 -554.54 561.44 261.01 3.39 BP _GYD CT CMS 70 3349.24 41.69 264.08 25.00 3203.41 -89.46 -89.46 -570.92 577.89 261.09 4.01 BP GYD CT CMS 71 3374.24 42.89 264.75 25.00 3221.91 -91.10 -91.10 -587.66 594.68 261.19 5.13 BP _GYD CT CMS 72 3399.24 43.37 264.96 25.00 3240.15 -92.63 -92.63 -604.68 611.74 261.29 2.00 BP _GYD CT CMS 73 3424.24 43.86 265.32 25.00 3258.25 -94.09 -94.09 -621.87 628.94 261.40 2.20 BP _GYD CT CMS 74 3449.24 44.02 266.28 25.00 3276.25 -95.36 -95.36 -639.17 646.24 261.51 2.74 BP _GYD CT CMS 75 3474.24 44.21 267.28 25.00 3294.20 -96.34 -96.34 -656.54 663.57 261.65 2.89 BP GYD CT CMS 76 3499.24 44.38 267.32 25.00 3312.10 -97.16 -97.16 -673.98 680.95 261.80 0.69 BP _GYD CT CMS 77 3524.24 44.61 266.45 25.00 3329.93 -98.12 -98.12 -691.48 698.40 261.92 2.61 BP _GYD CT CMS 78 3549.24 44.91 264.40 25.00 3347.68 -99.52 -99.52 -709.02 715.97 262.01 5.90 BP _GYD CT CMS 79 3574.24 45.21 262.90 25.00 3365.34 -101.48 -101.48 -726.61 733.66 262.05 4.41 BP _GYD CT CMS 80 3599.24 45.55 262.34 25.00 3382.90 -103.76 -103.76 -744.25 751.45 262.06 2.10 BP _GYD CT CMS 81 3624.24 45.94 261.75 25.00 3400.35 -106.24 -106.24 -761.99 769.36 262.06 2.30 BP _GYD CT CMS 82 3649.24 46.16 261.60 25.00 3417.70 -108.85 -108.85 -779.80 787.36 262.05 0.98 BP _GYD CT CMS 83 3674.24 46.36 261.58 25.00 3434.98 -111.49 -111.49 -797.66 805.42 262.04 0.80 BP _GYD CT CMS 84 3699.24 46.51 261.52 25.00 3452.21 -114.15 -114.15 -815.58 823.53 262.03 0.62 BP _GYD CT CMS 85 3724.24 46.40 261.39 25.00 3469.44 -116.84 -.116.84 -833.50 841.65 262.02 0.58 BP GYD CT CMS 86 3749.24 46.47 261.32 25.00 3486.67 -119.57 -119.57 -851.41 859.77 262.01 0.35 BP _GYD CT CMS 87 3774.24 46.55 261.30 25.00 3503.87 -122.31 -122.31 -869.34 877.90 261.99 0.33 BP _GYD CT CMS 88 3799.24 46.26 261.20 25.00 3521.11 -125.06 -125.06 -887.24 896.01 261.98 1.20 BP_ GYD CT CMS 89 3824.24 46.26 261.15 25.00 3538.39 -127.83 -127.83 -905.08 914.07 261.96 0.14 BP_ GYD CT CMS 90 3849.24 46.03 261.07 25.00 3555.72 -130.62 -130.62 -922.89 932.09 261.94 0.95 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] SCHLUNIBERGER Survey Report 5-Apr-2008 09:05:08 Page 5 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 3874.24 45.85 260.98 25.00 3573.10 -133.42 -133.42 -940.64 950.05 261.93 0.77 BP _GYD CT CMS 92 3"899.24 45.99 260.97 25.00 3590.49 -136.24 -136.24 -958.38 968.01 261.91 0.56 BP _GYD CT CMS 93 3924.24 45.67 261.01 25.00 3607.91 -139.05 -139.05 -976.09 985.94 261.89 1.29 BP _GYD CT CMS 94 3949.24 45.76 261.08 25.00 3625.37 -141.83 -141.83 -993.77 1003.84 261.88 0.41 BP _GYD CT CMS 95 3974.24 45.49 261.44 25.00 3642.85 -144.55 -144.55 -1011.43 1021.70 261.87 1.49 BP GYD CT CMS 96 3999.24 45.52 261.77 25.00 3660.37 -147.15 -147.15 -1029.07 1039.54 261.86 0.95 BP _GYD CT CMS 97 4024.24 45.62 261.98 25.00 3677.87 -149.68 -149.68 -1046.74 1057.39 261.86 0.72 BP _GYD CT CMS 98 4049.24 45.61 262.27 25.00 3695.36 -152.12 -152.12 -1064.44 1075.26 261.87 0.83 BP _GYD CT CMS 99 4074.24 45.65 262.40 25.00 3712.84 -154.51 -154.51 -1082.15 1093.13 261.87 0.40 BP _GYD CT CMS 100 4099.24 45.66 262.51 25.00 3730.32 -156.85 -156.85 -1099.88 1111.00 261.88 0.32 BP GYD CT CMS 101 4124.24 45.59 262.54 25.00 3747.80 -159.18 -159.18 -1117.59 1128.87 261.89 0.29 BP _GYD CT CMS 102 4149.24 45.71 262.52 25.00 3765.28 -161.50 -161.50 -1135.32 1146.75 261.90 0.48 BP _GYD CT CMS 103 4174.24 45.65 262.60 25.00 3782.74 -163.82 -163.82 -1153.05 1164.63 261.91 0.33 BP _GYD CT CMS 104 4199.24 45.78 262.63 25.00 3800.20 -166.12 -166.12 -1170.80 1182.53 261.92 0.53 BP _GYD CT CMS 105 4224.24 45.85 262.75 25.00 3817.62 -168.40 -168.40 -1188.58 1200.45 261.94 0.44 BP GYD CT CMS 106 4249.24 45.87 263.09 25.00 3835.03 -170.61 -170.61 -1206.39 1218.39 261.95 0.98 BP _GYD CT CMS 107 4274.24 45.70 263.71 25.00 3852.47 -172.67 -172.67 -1224.19 1236.31 261.97 1.90 BP _GYD CT CMS 108 4299.24 45.74 264.00 25.00 3869.92 -174.59 -174.59 -1241.98 1254.19 262.00 0.85 BP _GYD CT CMS 109 4324.24 45.70 264.86 25.00 3887.38 -176.32 -176.32 -1259.80 1272.08 262.03 2.47 BP _GYD CT CMS 110 4349.24 45.78 265.21 25.00 3904.82 -177.87 -177.87 -1277.63 1289.96 262.07 1.05 BP _GYD CT CMS 111 4374.24 45.79 265.67 25.00 3922.26 -179.30 -179.30 -1295.50 1307.84 262.12 1.32 BP _GYD CT CMS 112 4399.24 45.78 266.06 25.00 3939.69 -180.59 -180.59 -1313.37 1325.72 262.17 1.12 BP _GYD CT CMS 113 4424.24 45.83 266.19 25.00 3957.12 -181.80 -181.80 -1331.25 1343.61 262.22 0.42 BP _GYD CT CMS 114 4449.24 45.91 266.35 25.00 3974.53 -182.97 -182.97 -1349.16 1361.51 262.28 0.56 BP _GYD CT CMS 115 4474.24 45.74 266.47 25.00 3991.95 -184.09 -184.09 -1367.05 1379.39 262.33 0.76 BP GYD CT CMS 116 4499.24 45.89 266.55 25.00 4009.37 -185.18 -185.18 -1384.95 1397.27 262.38 0.64 BP _GYD CT CMS 117 4524.24 45.93 266.67 25.00 4026.77 -186.25 -186.25 -1402.87 1415.18 262.44 0.38 BP _GYD CT CMS 118 4549.24 45.91 266.74 25.00 4044.16 -187.28 -187.28 -1420.80 1433.09 262.49 0.22 BP _GYD CT CMS 119 4574.24 45.97 266.74 25.00 4061.54 -188.30 -188.30 -1438.74 1451.01 262.54 0.24 BP _GYD CT CMS 120 4599.24 45.81 266.70 25.00 4078.95 -189.33 -189.33 -1456.66 1468.91 262.59 0.65 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] SCHLLTMBERGER Survey Report 5-Apr-2008 09:05:08 Page 6 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 4624.24 45.64 266.61 25.00 4096.40 -190.37 -190.37 -1474.53 1486.76 262.64 0.73 BP _GYD CT CMS 122 4649.24 45.27 266.44 25.00 4113.93 -191.45 -191.45 -1492.31 1504.54 262.69 1.56 BP _GYD CT CMS 123 4674.24 45.41 266.48 25.00 4131.51 -192.55 -192.55 -1510.06 1522.29 262.73 0.57 BP _GYD CT CMS 124 4699.24 45.55 266.47 25.00 4149.04 -193.64 -193.64 -1527.85 1540.07 262.78 0.56 BP _GYD CT CMS 125 4724.24 45.38 266.51 25.00 4166.57 -194.74 -194.74 -1545.64 1557.86 262.82 0.69 BP GYD CT CMS 126 4749.24 45.28 266.72 25.00 4184.15 -195.79 -195.79 -1563.39 1575.60 262.86 0.72 BP _GYD CT CMS 127 4774.24 45.46 266.90 25.00 4201.71 -196.78 -196.78 -1581.15 1593.35 262.91 0.88 BP _GYD CT CMS 128 4799.24 45.46 267.40 25.00 4219.24 -197.66 -197.66 -1598.95 1611.12 262.95 1.43 BP _GYD CT CMS 129 4824.24 45.53 267.49 25.00 4236.77 -198.46 -198.46 -1616.76 1628.89 263.00 0.38 BP _GYD CT CMS 130 4849.24 45.67 267.57 25.00 4254.26 -199.23 -199.23 -1634.60 1646.70 263.05 0.60 BP GYD CT CMS 131 4874.24 45.40 267.67 25.00 4271.77 -199.97 -199.97 -1652.43 1664.49 263.10 1.12 BP _GYD CT CMS 132 4899.24 45.19 267.67 25.00 4289.36 -200.69 -200.69 -1670.18 1682.20 263.15 0.84 BP _GYD CT CMS 133 4924.24 45.31 267.66 25.00 4306.96 -201.41 -201.41 -1687.92 1699.90 263.20 0.48 BP _GYD CT CMS 134 4949.24 45.04 267.43 25.00 4324.58 -202.17 -202.17 -1705.64 1717.58 263.24 1.26 BP _GYD CT CMS 135 4974.24 45.21 267.53 25.00 4342.22 -202.95 -202.95 -1723.34 1735.25 263.28 0.74 BP GYD CT CMS 136 4999.24 45.23 267.35 25.00 4359.83 -203.74 -203.74 -1741.07 1752.95 263.33 0.52 BP _GYD CT CMS 137 5024.24 45.05 267.43 25.00 4377.46 -204.55 -204.55 -1758.77 1770.62 263.37 0.75 BP _GYD CT CMS 138 5049.24 45.16 267.44 25.00 4395.11 -205.34 -205.34 -1776.46 1788.29 263.41 0.44 BP _GYD CT CMS 139 5074.24 45.25 267.65 25.00 4412.72 -206.10 -206.10 -1794.19 1805.98 263.45 0.70 BP _GYD CT CMS 140 5099.24 45.47 268.19 25.00 4430.29 -206.75 -206.75 -1811.96 1823.72 263.49 1.77 BP _GYD CT CMS 141 5124.24 45.63 268.97 25.00 4447.80 -207.19 -207.19 -1829.80 1841.50 263.54 2.32 BP _GYD CT CMS 142 5149.24 45.86 269.94 25.00 4465.24 -207.36 -207.36 -1847.71 1859.31 263.60 2.93 BP _GYD CT CMS 143 5174.24 46.10 269.85 25.00 4482.62 -207.39 -207.39 -1865.68 1877.18 263.66 0.99 BP _GYD CT CMS 144 5199.24 46.22 269.92 25.00 4499.93 -207.43 -207.43 -1883.72 1895.10 263.72 0.52 BP _GYD CT CMS 145 5224.24 45.97 270.05 25.00 4517.27 -207.43 -207.43 -1901.73 1913.01 263.78 1.07 BP GYD CT CMS 146 5249.24 45.89 270.10 25.00 4534.66 -207.41 -207.41 -1919.69 1930.86 263.83 0.35 BP _GYD CT CMS 147 5274.24 46.09 270.12 25.00 4552.03 -207.38 -207.38 -1937.67 1948.74 263.89 0.80 BP _GYD CT CMS 148 5299.24 45.89 270.19 25.00 4569.40 -207.33 -207.33 -1955.65 1966.61 263.95 0.82 BP _GYD CT CMS 149 5324.24 45.96 270.22 25.00 4586.79 -207.26 -207.26 -1973.61 1984.47 264.00 0.29 BP _GYD CT CMS 150 5349.24 45.85 270.46 25.00 4604.18 -207.16 -207.16 -1991.57 2002.31 264.06 0.82 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] SCHLUMBERGER Survey Report 5-Apr-2008 09:05:08 Page 7 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 151 5374.24 45.48 270.70 25.00 4621.65 -206.98 -206.98 -2009.45 2020.08 264.12 1.63 BP _GYD CT CMS 152 5399.24 45.47 270.74 25.00 4639.19 -206.75 -206.75 -2027.27 2037.79 264.18 0.12 BP _GYD CT CMS 153 5424.24 45.61 270.77 25.00 4656.70 -206.52 -206.52 -2045.11 2055.51 264.23 0.57 BP _GYD CT CMS 154 5449.24 45.68 270.77 25.00 4674.17 -206.28 -206.28 -2062.99 2073.27 264.29 0.28 BP _GYD CT CMS 155 5474.24 45.59 270.75 25.00 4691.65 -206.04 -206.04 -2080.86 2091.03 264.35 0.36 BP GYD CT CMS 156 5499.24 45.61 270.81 25.00 4709.15 -205.80 -205.80 -2098.72 2108.78 264.40 0.19 BP _GYD CT CMS 157 5524.24 45.76 270.85 25.00 4726.61 -205.54 -205.54 -2116.60 2126.56 264.45 0.61 BP _GYD CT CMS 158 5549.24 45.77 271.06 25.00 4744.05 -205.24 -205.24 -2134.51 2144.36 264.51 0.60 BP _GYD CT CMS 159 5574.24 45.90 271.51 25.00 4761.47 -204.84 -204.84 -2152.44 2162.17 264.56 1.39 BP _GYD CT CMS 160 5599.24 46.09 271.75 25.00 4778.84 -204.33 -204.33 -2170.42 2180.01 264.62 1.03 BP GYD CT CMS 161 5624.24 46.41 272.64 25.00 4796.12 -203.63 -203.63 -2188.46 2197.91 264.68 2.87 BP _GYD CT CMS 162 5649.24 46.66 273.40 25.00 4813.32 -202.68 -202.68 -2206.58 2215.87 264.75 2.42 BP _GYD CT CMS 163 5674.24 46.94 274.45 25.00 4830.44 -201.43 -201.43 -2224.76 2233.86 264.83 3.26 BP _GYD CT CMS 164 5699.24 47.19 274.86 25.00 4847.47 -199.94 -199.94 -2243.00 2251.90 264.91 1.56 BP _GYD CT CMS 165 5724.24 47.38 274.92 25.00 4864.42 -198.38 -198.38 -2261.30 2269.99 264.99 0.78 BP GYD CT CMS 166 5749.24 47.51 274.97 25.00 4881.33 -196.79 -196.79 -2279.65 2288.13 265.07 0.54 BP _GYD CT CMS 167 5774.24 47.75 274.97 25.00 4898.18 -195.19 -195.19 -2298.05 2306.33 265.15 0.96 BP _GYD CT CMS 168 5799.24 47.97 274.98 25.00 4914.95 -193.58 -193.58 -2316.52 2324.59 265.22 0.88 BP _GYD CT CMS 169 5824.24 48.09 275.03 25.00 4931.67 -191.96 -191.96 -2335.04 2342.91 265.30 0.50 BP _GYD CT CMS 170 5849.24 48.28 275.20 25.00 4948.34 -190.30 -190.30 -2353.60 2361.28 265.38 0.91 BP _GYD CT CMS 171 5874.24 48.49 275.31 25.00 4964.94 -188.59 -188.59 -2372.21 2379.69 265.45 0.90 BP _GYD CT CMS 172 5899.24 48.71 275.84 25.00 4981.48 -186.77 -186.77 -2390.87 2398.16 265.53 1.82 BP _GYD CT CMS 173 5924.24 48.95 275.96 25.00 4997.93 -184.83 -184.83 -2409.59 2416.67 265.61 1.03 BP _GYD CT CMS 174 5949.24 49.15 276.07 25.00 5014.32 -182.85 -182.85 -2428.37 2435.24 265.69 0.87 BP _GYD CT CMS 175 5974.24 49.30 276.61 25.00 5030.64 -180.76 -180.76 -2447.18 2453.85 265.78 1.74 BP GYD CT CMS 176 5999.24 49.57 276.79 25.00 5046.90 -178.55 -178.55 -2466.05 2472.50 265.86 1.21 BP _GYD CT CMS 177 6024.24 50.09 277.17 25.00 5063.03 -176.22 -176.22 -2485.01 2491.25 265.94 2.38 BP _GYD CT CMS 178 6049.24 50.19 276.93 25.00 5079.05 -173.87 -173.87 -2504.05 2510.08 266.03 0.84 BP _GYD CT CMS 179 6074.24 50.13 276.15 25.00 5095.07 -171.68 -171.68 -2523.12 2528.96 266.11 2.41 BP _GYD CT CMS 180 6099.24 49.92 274.74 25.00 5111.13 -169.86 -169.86 -2542.20 2547.86 266.18 4.40 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] SCHLLTN~ERGER Survey Report 5-Apr-2008 09:05:08 Page 8 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 6124.24 49.18 272.27 25.00 5127.35 -168.70 -168.70 -2561.18 2566.73 266.23 8.08 BP _GYD CT CMS 182 6149.24 48.91 270.82 25.00 5143.74 -168.19 -168.19 -2580.05 2585.53 266.27 4.51 BP _GYD CT CMS 183 6174.24 48.68 268.82 25.00 5160.21 -168.25 -168.25 -2598.86 2604.30 266.30 6.09 BP _GYD CT CMS 184 6199.24 48.13 266.44 25.00 5176.81 -169.02 -169.02 -2617.54 2622.99 266.31 7.45 BP _GYD CT CMS 185 6224.24 47.86 264.76 25.00 5193.54 -170.44 -170.44 -2636.06 2641.56 266.30 5.11 BP GYD CT CMS 186 6249.24 47.39 262.94 25.00 5210.39 -172.42 -172.42 -2654.42 2660.02 266.28 5.70 BP _GYD CT CMS 187 6274.24 47.21 262.15 25.00 5227.34 -174.81 -174.81 -2672.64 2678.35 266.26 2.43 BP _GYD CT CMS 188 6299.24 47.50 262.21 25.00 5244.28 -177.31 -177.31 -2690.86 2696.69 266.23 1.17 BP _GYD CT CMS 189 6324.24 47.72 262.23 25.00 5261.13 -179.81 -179.81 -2709.15 2715.11 266.20 0.88 BP _GYD CT CMS 190 6349.24 47.75 262.33 25.00 5277.95 -182.29 -182.29 -2727.48 2733.57 266.18 0.32 BP GYD CT CMS 191 6374.24 47.54 262.58 25.00 5294.79 -184.72 -184.72 -2745.80 2752.01 266.15 1.12 BP _GYD CT CMS 192 6399.24 47.69 262.64 25.00 5311.64 -187.09 -187.09 -2764.11 2770.44 266.13 0.63 BP _GYD CT CMS 193 6424.24 47.94 262.71 25.00 5328.43 -189.45 -189.45 -2782.48 2788.93 266.10 1.02 BP _GYD CT CMS 194 6449.24 48.21 262.82 25.00 5345.13 -191.80 -191.80 -2800.94 2807.50 266.08 1.13 BP _GYD CT CMS 195 6474.24 48.86 263.31 25.00 5361.69 -194.06 -194.06 -2819.53 2826.20 266.06 2.99 BP GYD CT CMS 196 6499.24 49.33 263.45 25.00 5378.06 -196.24 -196.24 -2838.30 2845.08 266.04 1.93 BP _GYD CT CMS 197 6524.24 49.77 263.59 25.00 5394.28 -198.38 -198.38 -2857.21 2864.08 266.03 1.81 BP _GYD CT CMS 198 6549.24 50.05 263.60 25.00 5410.38 -200.52 -200.52 -2876.21 2883.19 266.01 1.12 BP _GYD CT CMS 199 6574.24 50.34 263.59 25.00 5426.38 -202.66 -202.66 -2895.30 2902.38 266.00 1.16 BP _GYD CT CMS 200 6599.24 50.60 263.64 25.00 5442.29 -204.80 -204.80 -2914.46 2921.65 265.98 1.05 BP _GYD CT CMS 201 6624.24 50.72 264.43 25.00 5458.14 -206.81 -206.81 -2933.69 2940.97 265.97 2.49 BP _GYD CT CMS 202 6649.24 50.98 264.89 25.00 5473.93 -208.62 -208.62 -2952.99 2960.35 265.96 1.77 BP _GYD CT CMS 203 6674.24 51.22 265.53 25.00 5489.6 -210.24 -210.24 -2972.38 2979.81 265.95 2.21 BP _GYD CT CMS 204 6699.24 51.43 265.64 25.00 5505.25 -211.74 -211.74 -2991.84 2999.32 265.95 0.91 BP _GYD CT CMS 205 6724.24 51.63 265.71 25.00 5520.80 -213.22 -213.22 -3011.36 3018.90 265.95 0.83 BP GYD CT CMS 206 6749.24 51.65 265.81 25.00 5536.31 -214.67 -214.67 -3030.91 3038.50 265.95 0.32 BP _GYD CT CMS 207 6774.24 51.70 265.83 25.00 5551.82 -216.10 -216.10 -3050.47 3058.11 265.95 0.21 BP _GYD CT CMS 208 6799.24 51.64 265.81 25.00 5567.32 -217.53 -217.53 -3070.03 3077.72 265.95 0.25 BP _GYD CT CMS 209 6824.24 51.48 265.82 25.00 5582.87 -218.96 -218.96 -3089.56 3097.31 265.95 0.64 BP _GYD CT CMS 210 6849.24 51.61 265.80 25.00 5598.41 -220.39 -220.39 -3109.08 3116.88 265.95 0.52 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] L SCHLUMBERGER Survey Report 5-Apr-2008 09:05:08 Page 9 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 6874.24 51.50 265.86 25.00 5613.96 -221.81 -221.81 -3128.61 3136.46 265.94 0.48 BP _GYD CT CMS 212 6899.24 51.42 265.98 25.00 5629.53 -223.20 -223.20 -3148.12 3156.02 265.94 0.49 BP _GYD CT CMS 213 6924.24 51.47 266.06 25.00 5645.11 -224.56 -224.56 -3167.62 3175.57 265.94 0.32 BP _GYD CT CMS 214 6949.24 51.18 266.31 25.00 5660.74 -225.86 -225.86 -3187.09 3195.09 265.95 1.40 BP _GYD CT CMS 215 6974.24 51.28 266.38 25.00 5676.39 -227.10 -227.10 -3206.54 3214.58 265.95 0.46 BP GYD CT CMS 216 6999.24 51.38 266.49 25.00 5692.01 -228.32 -228.32 -3226.03 3234.09 265.95 0.53 BP _GYD CT CMS 217 7024.24 51.22 266.60 25.00 5707.64 -229.49 -229.49 -3245.50 3253.60 265.96 0.73 BP _GYD CT CMS 218 7049.24 51.25 266.64 25.00 5723.30 -230.64 -230.64 -3264.96 3273.10 265.96 0.17 BP _GYD CT CMS 219 7074.24 51.29 266.71 25.00 5738.94 -231.77 -231.77 -3284.43 3292.60 265.96 0.27 BP _GYD CT CMS 220 7099.24 51.20 266.76 25.00 5754.59 -232.88 -232.88 -3303.89 3312.09 265.97 0.39 BP GYD CT CMS 221 7124.24 51.40 266.80 25.00 5770.22 -233.98 -233.98 -3323.37 3331.60 265.97 0.81 BP _GYD CT CMS 222 7149.24 51.41 266.89 25.00 5785.81 -235.05 -235.05 -3342.88 3351.14 265.98 0.28 BP _GYD CT CMS 223 7174.24 51.41 266.94 25.00 5801.41 -236.11 -236.11 -3362.40 3370.68 265.98 0.16 BP _GYD CT CMS 224 7199.24 51.55 267.03 25.00 5816.98 -237.13 -237.13 -3381.93 3390.23 265.99 0.63 BP _GYD CT CMS 225 7224.24 51.41 267.11 25.00 5832.55 -238.13 -238.13 -3401.46 3409.79 266.00 0.61 BP GYD CT CMS 226 7249.24 51.36 267.14 25.00 5848.15 -239.11 -239.11 -3420.97 3429.32 266.00 0.22 BP _GYD CT CMS 227 7274.24 51.43 267.16 25.00 5863.75 -240.08 -240.08 -3440.48 3448.85 266.01 0.29 BP _GYD CT CMS 228 7299.24 51.35 267.20 25.00 5879.35 -241.05 -241.05 -3460.00 3468.38 266.01 0.34 BP GAD CT CMS 229 7324.24 51.38 267.26 25.00 5894.96 -241.99 -241.99 -3479.50 3487.91 266.02 0.22 BP _GYD CT CMS 230 7349.24 51.22 267.34 25.00 5910.59 -242.91 -242.91 -3498.99 3507.41 266.03 0.69 BP _GYD CT CMS • 231 7374.24 51.19 267.39 25.00 5926.25 -243.80 -243.80 -3518.46 3526.89 266.04 0.20 BP _GYD CT CMS 232 7399.24 51.25 267.40 25.00 5941.91 -244.69 -244.69 -3537.92 3546.38 266.04 0.24 BP _GYD CT CMS 233 7424.24 50.92 267.50 25.00 5957.61 -245.56 -245.56 -3557.36 3565.82 266.05 1.36 BP _GYD CT CMS 234 7449.24 50.70 267.55 25.00 5973.41 -246.39 -246.39 -3576.71 3585.19 266.06 0.89 BP _GYD CT CMS 235 7474.24 50.83 267.60 25.00 5989.22 -247.21 -247.21 -3596.06 3604.55 266.07 0.54 BP GYD CT CMS 236 7499.24 50.93 267.63 25.00 6005.00 -248.02 -248.02 -3615.44 3623.94 266.08 0.41 BP _GYD CT CMS 237 7524.24 50.87 267.75 25.00 6020.76 -248.80 -248.80 -3634.83 3643.33 266.08 0.44 BP _GYD CT CMS 238 7549.24 50.72 267.89 25.00 6036.57 -249.54 -249.54 -3654.18 3662.69 266.09 0.74 BP _GYD CT CMS 239 7574.24 50.33 268.00 25.00 6052.46 -250.23 -250.23 -3673.47 3681.98 266.10 1.60 BP _GYD CT CMS 240 7599.24 50.48 268.01 25.00 6068.39 -250.90 -250.90 -3692.72 3701.24 266.11 0.60 BP GYD CT CMS [(0)2008 IDEAL ID13_OC_06] SCHLiTMBERGER Survey Report 5-Apr-2008 09:05:08 Page 10 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 7624.24 50.61 268.01 25.00 6084.28 -251.57 -251.57 -3712.01 3720.53 266.12 0.52 BP _GYD CT CMS 242 7649.24 50.49 268.09 25.00 6100.17 -252.23 -252.23 -3731.31 3739.82 266.13 0.54 BP _GYD CT CMS 243 7674.24 50.59 268.03 25.00 6116.06 -252.88 -252.88 -3750.60 3759.11 266.14 0.44 BP _GYD CT CM5 244 7699.24 50.33 268.00 25.00 6131.97 -253.55 -253.55 -3769.86 3778.38 266.15 1.04 BP _GYD CT CMS 245 7724.24 50.37 265.99 25.00 6147.92 -254.56 -254.56 -3789.09 3797.63 266.16 6.19 BP GYD CT CMS 246 7749.24 50.16 267.97 25.00 6163.91 -255.57 -255.57 -3808.28 3816.85 266.16 6.15 BP _GYD CT CMS 247 7774.24 49.91 267.95 25.00 6179.96 -256.25 -256.25 -3827.43 3836.00 266.17 1.00 BP _GYD CT CMS 248 7799.24 50.07 267.95 25.00 6196.04 -256.94 -256.94 -3846.57 3855.14 266.18 0.64 BP _GYD CT CMS 249 7824.24 50.22 267.95 25.00 6212.06 -257.63 -257.63 -3865.75 3874.32 266.19 0.60 BP _GYD CT CMS 250 7849.24 50.01 267.97 25.00 6228.09 -258.31 -258.31 -3884.92 3893.50 266.20 0.84 BP GYD CT CMS 251 7874.24 49.85 268.01 25.00 6244.18 -258.98 -258.98 -3904.04 3912.62 266.20 0.65 BP _GYD CT CMS 252 7899.24 49.83 268.01 25.00 6260.31 -259.64 -259.64 -3923.13 3931.71 266.21 0.08 BP _GYD CT CMS 253 7924.24 49.77 268.07 25.00 6276.44 -260.30 -260.30 -3942.22 3950.80 266.22 0.30 BP _GYD CT CMS 254 7949.24 49.65 268.16 25.00 6292.61 -260.92 -260.92 -3961.27 3969.86 266.23 0.55 BP _GYD CT CMS 255 7974.24 49.38 268.21 25.00 6308.84 -261.52 -261.52 -3980.28 3988.86 266.24 1.09 BP GYD CT CMS 256 7999.24 49.27 268.22 25.00 6325.13 -262.12 -262.12 -3999.23 4007.81 266.25 0.44 BP _GYD CT CMS 257 8024.24 49.36 268.19 25.00 6341.43 -262.71 -262.71 -4018.18 4026.76 266.26 0.37 BP _GYD CT CMS 258 8049.24 49.16 268.20 25.00 6357.75 -263.31 -263.31 -4037.11 4045.69 266.27 0.80 BP _GYD CT CMS 259 8074.24 49.07 268.22 25.00 6374.11 -263.90 -263.90 -4056.00 4064.58 266.28 0.37 BP _GYD CT CMS 260 8099.24 49.04 268.26 25.00 6390.49 -264.48 -264.48 -4074.88 4083.45 266.29 0.17 BP _GYD CT CMS • 261 8124.24 48.83 268.24 25.00 6406.92 -265.05 -265.05 -4093.72 4102.29 266.30 0.84 BP _GYD CT CMS 262 8149.24 48.97 268.24 25.00 6423.35 -265.63 -265.63 -4112.55 4121.12 266.30 0.56 BP _GYD CT CMS 263 8174.24 48.79 268.22 25.00 6439.79 -266.21 -266.21 -4131.37 4139.94 266.31 0.72 BP _GYD CT CMS 264 8199.24 48.58 268.27 25.00 6456.30 -266.79 -266.79 -4150.14 4158.71 266.32 0.85 BP _GYD CT CMS 265 8224.24 48.61 268.30 25.00 6472.83 -267.35 -267.35 -4168.88 4177.45 266.33 0.15 BP GYD CT CMS 266 8249.24 48.35 268.31 25.00 6489.40 -267.90 -267.90 -4187.59 4196.15 266.34 1.04 BP _GYD CT CMS 267 8274.24 48.36 268.29 25.00 6506.02 -268.46 -268.46 -4206.27 4214.83 266.35 0.07 BP _GYD CT CMS 268 8299.24 48.32 268.27 25.00 6522.63 -269.02 -269.02 -4224.94 4233.49 266.36 0.17 BP _GYD CT CMS 269 8324.24 48.07 268.39 25.00 6539.30 -269.56 -269.56 -4243.56 4252.12 266.37 1.06 BP _GYD CT CMS 270 8349.24 47.86 268.44 25.00 6556.04 -270.07 -270.07 -4262.13 4270.67 266.37 0.85 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] L 5CHLUMBERGER Survey Report 5-Apr-2008 09:05:08 Page 11 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 271 8374.24 47.50 268.50 25.00 6572.87 -270.57 -270.57 -4280.60 4289.15 266.38 1.45 BP _GYD CT CMS 272 8399.24 47.26 268.47 25.00 6589.80 -271.05 -271.05 -4298.99 4307.53 266.39 0.96 BP _GYD CT CMS 273 8424.24 47.35 268.42 25.00 6606.75 -271.55 -271.55 -4317.36 4325.89 266.40 0.39 BP _GYD CT CMS 274 8449.24 47.16 268.41 25.00 6623.72 -272.06 -272.06 -4335.71 4344.24 266.41 0.76 BP _GYD CT CMS 275 8474.24 46.93 268.41 25.00 6640.76 -272.57 -272.57 -4354.00 4362.53 266.42 0.92 BP GYD CT CMS 276 8499.24 46.65 268.41 25.00 6657.87 -273.07 -273.07 -4372.22 4380.74 266.43 1.12 BP _GYD CT CMS 277 8524.24 46.39 268.39 25.00 6675.07 -273.58 -273.58 -4390.35 4398.87 266.43 1.04 BP _GYD CT CMS 278 8549.24 46.34 268.44 25.00 6692.33 -274.08 -274.08 -4408.44 4416.95 266.44 0.25 BP _GYD CT CMS 279 8574.24 46.29 268.50 25.00 6709.59 -274.56 -274.56 -4426.51 4435.02 266.45 0.26 BP _GYD CT CMS 280 8599.24 45.87 268.55 25.00 6726.93 -275.03 -275.03 -4444.51 4453.01 266.46 1.69 BP GYD CT CMS 281 8624.24 45.83 268.61 25.00 6744.35 -275.47 -275.47 -4462.45 4470.94 266.47 0.24 BP _GYD CT CMS 282 8649.24 45.81 268.69 25.00 6761.77 -275.89 -275.89 -4480.37 4488.86 266.48 0.24 BP _GYD CT CMS 283 8674.24 45.50 268.80 25.00 6779.25 -276.29 -276.29 -4498.24 4506.72 266.49 1.28 BP _GYD CT CMS 284 8699.24 45.52 268.83 25.00 6796.77 -276.65 -276.65 -4516.07 4524.54 266.49 0.12 BP _GYD CT CMS 285 8724.24 45.24 268.84 25.00 6814.33 -277.02 -277.02 -4533.87 4542.32 266.50 1.12 BP GYD CT CMS 286 8749.24 44.99 268.84 25.00 6831.97 -277.37 -277.37 -4551.57 4560.02 266.51 1.00 BP _GYD CT CMS 287 8774.24 45.02 268.83 25.00 6849.64 -277.73 -277.73 -4569.25 4577.68 266.52 0.12 BP _GYD CT CMS 288 8799.24 44.69 268.92 25.00 6867.37 -278.08 -278.08 -4586.88 4595.30 266.53 1.34 BP _GYD CT CMS 289 8824.24 44.63 268.91 25.00 6885.15 -278.41 -278.41 -4604.45 4612.86 266.54 0.24 BP _GYD CT CMS 290 8849.24 44.67 268.93 25.00 6902.93 -278.74 -278.74 -4622.02 4630.41 266.55 0.17 BP _GYD CT CMS 291 8874.24 44.32 268.90 25.00 6920.77 -279.08 -279.08 -4639.53 4647.92 266.56 1.40 BP _GYD CT CMS 292 8899.24 44.34 268.89 25.00 6938.65 -279.41 -279.41 -4657.00 4665.37 266.57 0.08 BP _GYD CT CMS 293 8924.24 44.21 268.89 25.00 6956.55 -279.75 -279.75 -4674.45 4682.81 266.58 0.52 BP _GYD CT CMS 294 8949.24 43.77 268.88 25.00 6974.54 -280.09 -280.09 -4691.81 4700.16 266.58 1.76 BP _GYD CT CMS 295 8974.24 43.80 268.85 25.00 6992.58 -280.43 -280.43 -4709.10 4717.45 266.59 0.15 BP GYD CT CMS 296 8999.24 43.71 268.77 25.00 7010.64 -280.79 -280.79 -4726.39 4734.72 266.60 0.42 BP _GYD CT CMS 297 9024.24 43.64 268.67 25.00 7028.72 -281.18 -281.18 -4743.65 4751.98 266.61 0.39 BP _GYD CT CMS 298 9049.24 43.49 268.63 25.00 7046.84 -281.58 -281.58 -4760.87 4769.19 266.62 0.61 BP _GYD CT CMS 299 9074.24 43.21 268.56 25.00 7065.02 -282.00 -282.00 -4778.03 4786.35 266.62 1.14 BP _GYD CT CMS 300 9099.24 43.20 268.51 25.00 7083.24 -282.44 -282.44 -4795.14 4803.45 266.63 0.14 BP GYD CT CMS [(c)2008 IDEAL ID13_OC_06] s SCHLUMBERGER Survey Report 5-Apr-2008 09:05:08 Page 12 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 301 9124.24 43.17 268.48 25.00 7101.47 -282.89 -282.89 -4812.24 4820.55 266.64 0.15 BP _GYD CT CMS 302 9149.24 42.98 268.41 25.00 7119.73 -283.35 -283.35 -4829.31 4837.62 266.64 0.78 BP _GYD CT CMS 303 9174.24 43.00 268.32 25.00 7138.02 -283.84 -283.84 -4846.35 4854.66 266.65 0.26 BP _GYD CT CMS 304 9199.24 42.87 268.29 25.00 7156.32 -284.34 -284.34 -4863.37 4871.68 266.65 0.53 BP _GYD CT CMS 305 9224.24 42.74 268.29 25.00 7174.66 -284.85 -284.85 -4880.35 4888.66 266.66 0.52 BP GYD CT CMS 306 9249.24 42.82 268.32 25.00 7193.01 -285.35 -285.35 -4897.33 4905.63 266.67 0.33 BP _GYD CT CMS 307 9274.24 42.44 268.32 25.00 7211.40 -285.85 -285.85 -4914.25 4922.56 266.67 1.52 BP _GYD CT CMS 308 9299.24 42.30 268.27 25.00 7229.87 -286.35 -286.35 -4931.09 4939.40 266.68 0.58 BP _GYD CT CMS 309 9324.24 42.38 268.27 25.00 7248.35 -286.86 -286.86 -4947.92 4956.23 266.68 0.32 BP _GYD CT CMS 310 9349.24 42.04 268.20 25.00 7266.87 -287.38 -287.38 -4964.71 4973.02 266.69 1.37 BP GYD CT CMS 311 9374.24 41.94 268.20 25.00 7285.45 -287.90 -287.90 -4981.43 4989.74 266.69 0.40 BP _GYD CT CMS 312 9399.24 41.91 268.20 25.00 7304.05 -288.43 -288.43 -4998.12 5006.44 266.70 0.12 BP _GYD CT CMS 313 9424.24 41.59 268.19 25.00 7322.70 -288.95 -288.95 -5014.76 5023.08 266.70 1.28 BP _GYD CT CMS 314 9449.24 41.57 268.18 25.00 7341.40 -289.48 -289.48 -5031.34 5039.66 266.71 0.08 BP _GYD CT CMS 315 9474.24 41.34 268.14 25.00 7360.14 -290.01 -290.01 -5047.89 5056.21 266.71 0.93 BP GYD CT CMS 316 9499.24 41.13 268.07 25.00 7378.94 -290.55 -290.55 -5064.35 5072.68 266.72 0.86 BP _GYD CT CMS 317 9524.24 41.29 267.97 25.00 7397.75 -291.12 -291.12 -5080.82 5089.15 266.72 0.69 BP _GYD CT CMS 318 9549.24 41.16 267.95 25.00 7416.55 -291.71 -291.71 -5097.28 5105.62 266.72 0.52 BP _GYD CT CMS 319 9574.24 40.72 267.88 25.00 7435.44 -292.30 -292.30 -5113.65 5122.00 266.73 1.77 BP _GYD CT CMS 320 9599.24 40.63 267.90 25.00 7454.40 -292.90 -292.90 -5129.93 5138.29 266.73 0.36 BP _GYD CT CMS 321 9624.24 40.37 267.98 25.00 7473.41 -293.49 -293.49 -5146.16 5154.52 266.74 1.06 BP _GYD CT CMS 322 9649.24 40.26 268.08 25.00 7492.47 -294.04 -294.04 -5162.32 5170.69 266.74 0.51 BP _GYD CT CMS 323 9674.24 40.16 268.20 25.00 7511.56 -294.57 -294.57 -5178.46 5186.83 266.74 0.51 BP _GYD CT CMS 324 9699.24 39.70 268.33 25.00 7530.73 -295.05 -295.05 -5194.50 5202.87 266.75 1.87 BP _GYD CT CM5 325 9724.24 39.48 268.38 25.00 7550.00 -295.51 -295.51 -5210.42 5218.79 266.75 0.89 BP GYD CT CMS 326 9749.24 39.09 268.43 25.00 7569.35 -295.95 -295.95 -5226.24 5234.62 266.76 1.57 BP _GYD CT CMS 327 9774.24 38.76 268.54 25.00 7588.80 -296.37 -296.37 -5241.95 5250.32 266.76 1.35 BP _GYD CT CMS 328 9799.24 38.83 268.61 25.00 7608.28 -296.76 -296.76 -5257.60 5265.97 266.77 0.33 BP _GYD CT CMS 329 9817.00 38.80 268.60 17.76 7622.12 -297.03 -297.03 -5268.73 5277.10 266.77 0.17 BP _BLIND 330 9834.00 39.24 270.00 17.00 7635.33 -297.16 -297.16 -5279.44 5287.79 266.78 5.79 BP BLIND [(c)2008 IDEAL ID13_OC_06] s SCHLUNIBERGER Survey Report 5-Apr-2008 09:05:08 Page 13 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 331 9845.36 39.24 270.00 11.36 7644.13 -297.16 -297.16 - 5286.62 5294.97 266.78 0 00 BP _INC+TREND 332 9942.22 36.07 276.00 96.86 7720.83 -294.17 -294.17 - 5345.65 5353.74 266.85 5.00 BP _INC+TREND 333 10038.17 33.11 277.00 95.95 7799.81 -288.03 -288.03 - 5399.76 5407.44 266.95 3.14 BP _INC+TREND 334 10133.31 32.68 278.00 95.14 7879.70 -281.28 -281.28 - 5450.99 5458.24 267.05 0.73 BP _INC+TREND 335 10229.63 30.99 279.00 96.32 7961.52 -273.79 -273.79 - 5501.24 5508.05 267.15 1.84 BP INC+TREND 336 10324.54 30.63 279.63 94.91 8043.04 -265.92 -265.92 - 5549.21 5555.58 267.26 0.51 BP _MWD+IFR+MS • 337 10420.74 31.32 281.44 96.20 8125.52 -256.86 -256.86 - 5597.88 5603.77 267.37 1.20 BP _MWD+IFR+MS 338 10515.78 30.41 281.17 95.04 8207.10 -247.30 -247.30 - 5645.69 5651.10 267.49 0.97 BP _MWD+IFR+MS 339 10611.69 30.46 281.46 95.91 8289.80 -237.77 -237.77 - 5693.33 5698.29 267.61 0.16 BP _MWD+IFR+MS 340 10707.29 30.75 282.38 95.60 8372.08 -227.71 -227.71 - 5740.95 5745.46 267.73 0.58 BP MWD+IFR+MS 341 10766.09 342 10836.52 343 10869.10 344 10902.75 345 10934.70 346 10967.78 347 10998.54 348 11031.29 349 11063.30 350 11095.14 351 11126.94 352 11159.92 353 11190.73 354 11223.77 355 11255.41 356 11285.68 357 11317.42 358 11350.12 359 11381.57 360 11412.86 30.08 281.87 58.80 8422.79 -221.46 -221.46 -5770.05 5774.30 267.80 1.22 BP _MWD+IFR+MS 31.28 283.50 70.43 8483.36 -213.56 -213.56 -5805.10 5809.03 267.89 2.07 BP _MWD+IFR+MS 36.03 283.60 32.58 8510.47 -209.33 -209.33 -5822.65 5826.41 267.94 14.58 BP _MWD+IFR+MS 41.32 284.64 33.65 8536.73 -204.19 -204.19 -5843.04 5846.60 268.00 15.84 BP _MWD+IFR+MS 43.77 287.81 31.95 8560.27 -198.14 -198.14 -5863.77 5867.11 268.06 10.19 BP MWD+IFR+MS 43.33 286.98 33.08 8584.25 -191.33 -191.33 -5885.52 5888.63 268.14 2.18 BP _MWD+IFR+MS 43.05 286.50 30.76 8606.67 -185.27 -185.27 -5905.68 5908.58 268.20 1.40 BP _MWD+IFR+MS 43.98 281.40 32.75 8630.43 -179.84 -179.84 -5927.55 5930.28 268.26 11.09 BP _MWD+IFR+MS 44.04 279.16 32.01 8653.45 -175.87 -175.87 -5949.43 5952.03 268.31 4.87 BP _MWD+IFR+MS 43.92 279.39 31.84 8676.37 -172.31 -172.31 -5971.25 5973.73 268.35 0.63 BP _MWD+IFR+MS • 43.47 280.17 31.80 8699.36 -168.58 -168.58 -5992.90 5995.27 268.39 2.21 BP _MWD+IFR+MS 43.01 279.87 32.98 8723.38 -164.65 -164.65 -6015.15 6017.40 268.43 1.53 BP_ MWD+IFR+MS 42.23 279.36 30.81 8746.06 -161.16 -161.16 -6035.71 6037.87 268.47 2.77 BP_ MWD+IFR+MS 41.90 279.94 33.04 8770.58 -157.45 -157.45 -6057.54 6059.58 268.51 1.54 BP_ MWD+IFR+MS 41.32 280.00 31.64 8794.24 -153.82 -153.82 -6078.23 6080.18 268.55 1.84 BP MWD+IFR+MS 40.81 280.09 30.27 8817.06 -150.35 -150..35 -6097.81 6099.66 268.59 1.70 BP MWD+IFR+MS 43.70 281.17 31.74 8840.55 -146.41 -146.41 -6118.78 6120.53 268.63 9.39 BP_ MWD+IFR+MS 45.10 283.89 32.70 8863.92 -141.44 -141.44 -6141.11 6142.74 268.68 7.22 BP_ MWD+IFR+MS 47.51 283.11 31.45 8885.64 -136.13 -136.13 -6163.22 6164.72 268.73 7.87 BP_ MWD+IFR+MS 53.50 283.51 31.29 8905.53 -130.57 -130.57 -6186.71 6188.08 268.79 19.17 BP MWD+IFR+MS [(c)2008 IDEAL ID13_OC_06] J 7 ~ SCHLTJMBERGER Survey Report 5-Apr-2008 09:05:08 Page 14 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 361 11446.33 54.45 284.82 33.47 8925.22 -123.95 -123.95 -6212.95 6214.19 268.86 4.25 BP _MWD+IFR+MS 362 11477.42 57.37 282.40 31.09 8942.65 -117.90 -117.90 -6237.97 6239.09 268.92 11.39 BP _MWD+IFR+MS 363 11509.05 63.99 283.28 31.63 8958.13 -111.77 -111.77 -6264.84 6265.84 268.98 21.07 BP _MWD+IFR+MS 364 11541.98 65.61 284.87 32.93 8972.15 -104.52 -104.52 -6293.74 6294.61 269.05 6.58 BP _MWD+IFR+MS 365 11572.96 68.20 283.92 30.98 8984.30 -97.44 -97.44 -6321.34 6322.09 269.12 8.82 BP MWD+IFR+MS 366 11604.89 71.47 280.92 31.93 8995.31 -91.00 -91.00 -6350.61 6351.26 269.18 13.51 BP _MWD+IFR+MS 367 11638.13 74.35 281.08 33.24 9005.07 -84.94 -84.94 -6381.79 6382.36 269.24 8.68 BP _MWD+IFR+MS 368 11668.85 74.60 281.87 30.72 9013.30 -79.05 -79.05 -6410.80 6411.29 269.29 2.61 BP _MWD+IFR+MS 369 11700.83 76.93 280.80 31.98 9021.16 -72.96 -72.96 -6441.19 6441.60 269.35 7.97 BP _MWD+IFR+MS 370 11733.08 79.70 278.87 32.25 9027.69 -67.57 -67.57 -6472.30 6472.66 269.40 10.40 BP MWD+IFR+MS 371 11755.20 372 11785.15 373 11817.13 374 11850.34 375 11881.35 376 11914.12 377 11946.34 378 11976.92 379 12010.75 380 12043.10 381 12072.73 382 12105.23 383 12138.31 384 12168.86 385 12200.87 386 12234.14 387 12264.77 388 12297.14 389 12329.81 390 12359.87 81.65 278.98 22.12 9031.28 -64.18 -64.18 -6493.87 6494.18 269.43 8.83 BP _MWD+IFR+MS 83.59 276.94 29.95 9035.12 -60.07 -60.07 -6523.28 6523.56 269.47 9.36 BP _MWD+IFR+MS 86.55 275.75 31.98 9037.87 -56.55 -56.55 -6554.94 6555.19 269.51 9.97 BP _MWD+IFR+MS 89.46 276.95 33.21 9039.03 -52.88 -52.88 -6587.92 6588.14 269.54 9.48 BP _MWD+IFR+MS 89.60 277.49 31.01 9039.28 -48.98 -48.98 -6618.69 6618.87 269.58 1.80 BP _MWD+IFR+MS 89.87 279.13 32.77 9039.43 -44.25 -44.25 -6651.11 6651.26 269.62 5.07 BP _MWD+IFR+MS 89.19 280.34 32.22 9039.70 -38.80 -38.80 -6682.87 6682.98 269.67 4.31 BP _MWD+IFR+MS 88.64 280.79 30.58 9040.28 -33.19 -33.19 -6712.92 6713.00 269.72 2.32 BP _MWD+IFR+MS 89.26 280.38 33.83 9040.90 -26.98 -26.98 -6746.17 6746.22 269.77 2.20 BP_ MWD+IFR+MS 89.84 280.52 32.35 9041.15 -21.11 -21.11 -6777.98 6778.01 269.82 1.84 BP_ MWD+IFR+MS • 89.74 281.19 29.63 9041.26 -15.53 -15.53 -6807.08 6807.10 269.87 2.29 BP_ MWD+IFR+MS 89.70 280.53 32.50 9041.42 -9.41 -9.41 -6839.00 6839.01 269.92 2.03 BP_ MWD+IFR+MS 91.07 279.67 33.08 9041.20 -3.61 -3.61 -6871.56 6871.56 269.97 4.89 BP_ MWD+IFR+MS 92.03 279.05 30.55 9040.37 1.36 1.36 -6901.70 6901.70 270.01 3.74 BP_ MWD+IFR+MS 92.72 280.56 32.01 9039.04 6.81 6.81 -6933.21 6933.21 270.06 5.18 BP MWD+IFR+MS 92.76 280.86 33.27 9037.45 12.98 12.98 -6965.86 6965.88 270.11 0.91 BP_ MWD+IFR+MS 91.18 282.84 30.63 9036.40 19.27 19.27 -6995.82 6995.85 270.16 8.27 BP_ MWD+IFR+MS 90.01 281.44 32.37 9036.06 26.07 26.07 -7027.46 7027.51 270.21 5.64 BP_ MWD+IFR+MS 90.32 282.19 32.67 9035.97 32.76 32.76 -7059.44 7059.52 270.27 2.48 BP_ MWD+IFR+MS 90.35 281.19 30.06 9035.79 38.85 38.85 -7088.88 7088.98 270.31 3.33 BP_ MWD+IFR+MS [(c)2008 IDEAL ID13_OC_06] r ~ ~ SCHLUN~ERGER Survey Report 5-Apr-2008 09:05:08 Page 15 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 391 12391.59 90.22 281.81 31.72 9035.64 45.18 45.18 -7119.96 7120.10 270 36 2.00 BP _MWD+IFR+MS 392 12426.13 90.25 281.54 34.54 9035.49 52.17 52.17 -7153.78 7153.97 270.42 0.79 BP _MWD+IFR+MS 393 12456.07 90.05 280.19 29.94 9035.42 57.81 57.81 -7183.19 7183.42 270.46 4.56 BP _MWD+IFR+MS 394 12487.14 90.32 278.61 31.07 9035.32 62.89 62.89 -7213.84 7214.11 270.50 5.16 BP _MWD+IFR+MS 395 12520.72 90.66 279.90 33.58 9035.03 68.29 68.29 -7246.98 7247.30 270.54 3.97 BP MWD+IFR+MS 396 12551.29 90.59 278.47 30.57 9034.70 73.16 73.16 -7277.15 7277.52 270.58 4.68 BP _MWD+IFR+MS 397 12583.64 89.19 276.84 32.35 9034.76 77.47 77.47 -7309.21 7309.63 270.61 6.64 BP _MWD+IFR+MS 398 12615.66 89.02 276.75 32.02 9035.26 81.26 81.26 -7341.01 7341.46 270.63 0.60 BP _MWD+IFR+MS 399 12647.04 88.74 277.88 31.38 9035.87 85.26 85.26 -7372.12 7372.62 270.66 3.71 BP _MWD+IFR+MS 400 12678.73 88.33 275.97 31.69 9036.68 89.08 89.08 -7403.57 7404.11 270.69 6.16 BP MWD+IFR+MS 401 12711.28 88.67 274.80 32.55 9037.53 92.13 92.13 -7435.97 7436.54 270.71 3.74 BP _MWD+IFR+MS 402 12742.28 88.47 275.94 31.00 9038.31 95.03 95.03 -7466.82 7467.42 270.73 3.73 BP _MWD+IFR+MS 403 12774.36 88.33 273.73 32.08 9039.20 97.73 97.73 -7498.77 7499.41 270.75 6.90 BP _MWD+IFR+MS 404 12807.36 88.74 272.29 33.00 9040.05 99.46 99.46 -7531.71 7532.37 270.76 4.54 BP _MWD+IFR+MS 405 12837.62 90.15 273.98 30.26 9040.34 101.12 101.12 -7561.93 7562.60 270.77 7.27 BP MWD+IFR+MS 406 12870.53 90.15 274.31 32.91 9040.25 103.50 103.50 -7594.75 7595.45 270.78 1.00 BP _MWD+IFR+MS 407 12902.89 90.25 271.80 32.36 9040.14 105.22 105.22 -7627.06 7627.79 270.79 7.76 BP _MWD+IFR+MS 408 12933.83 90.22 273.16 30.94 9040.01 106.56 106.56 -7657.97 7658.71 270.80 4.40 BP _MWD+IFR+MS 409 12966.11 90.05 271.81 32.28 9039.94 107.96 107.96 -7690.22 7690.98 270.80 4.22 BP _MWD+IFR+MS 410 12998.41 90.08 273.33 32.30 9039.90 109.41 109.41 -7722.49 7723.26 270.81 4.71 BP MWD+IFR+MS 411 13062.00 90.08 273.33 73.59 9039.82 113.10 113.10 -7785.97 7786.79 270.83 0.00 Project to TD CJ [(c)2008 IDEAL ID13_OC_06] Drilling 8 Measurements [iAWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Well No E-10B Dispatched To: Christine Mahnken Date Dispatched: Installation/Rig Nabors 7ES Dispatched By: 25-Mar-08 F. Medina Data No Of Prints No of Flo ies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 Anchorage, Alaska 99501 fdarke3@slb.com Fax: 907-561-8317 LWD Log Delivery V2.1, 03-06-06 add-c~3~ ~~~ ~ ~ ~ ~ ~,~ ~ SARAH PAL/N GOV ERNOR CO1~SE8,Q0]~ ^ ~~+~ 333 W 7th AVENUE, SUITE 100 1~ l~o~~`~~'~~~iii~~•iiiiii----777 oi` ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Pool, PBU E-1 OB BP Exploration Alaska Inc Permit No: 208-030 Surface Location: 353' FNL, 500 FEL, SEC. 06, T11N, R14E, UM Bottomhole Location: 240' FNL, 3400' FEL, SEC. O1, T11N, R13E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). incerely, Daniel . Seamount, Jr. Chair DATED this ~ day of March, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ^~°« STATE OF ALASKA ~~~ ALASK~L AND GAS CONSERVATION COM IS~N PERMIT TO DRILL ~~~ Alsaka Oil F~ Gas Cops, Commission 20 AAC 25.005 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Spe ~ ' ell is fir: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. ' 6194193 11. Well Name and Number: PBU E-10B 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 13089 TVD 9039 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ~. ADL 028280 Pool FEL, SEC. 06, T11 N, R14E, UM FNL, 500 353 Top of Productive Horizon: 445' FNL, 2162' FEL, SEC. 01, T11N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: .~ April 1, 2008 Total Depth: 240' FNL, 3400' FEL, SEC. 01, T11N, R13E, UM 9. Acres in Property: ~ 2560 14. Distance to Nearest Property: 5000' 4b. Location of Well (State Base Plane Coordinates): Surface: x-664449 y-5976710 Zone-ASP4 10. KB Elevation Plan (Height above GL): 58.7 feet 15. Distance to Nearest Well Within Pool: 550' 16. Deviated Wells: Kickoff Depth: ~ g830 feet Maximum Hole An le: ti 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: ~ 3690 Surface^ 2810 t8 Casin Pr ram: S c~catio ns' To - Settin De th -Bottom uanti 'of Gement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data N/A 7" Tieback 26# L-80 TCII 9680' Surface 9680' Surface 9680' 977 cu ft Class'G' 8-1/2" 7" 26# L-80 BTC-M 1138' 9680' 7520' 10818' 8465' 266 cu ft Class'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 2416' 10668' 8336' 13084' 9039' 363 cu ft Cla s'G' 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redriltand Re-entry Operations) Total Depth MD (ft): 12784 Total Depth TVD (ft): g027 Plugs (measured): 10195 Effective Depth MD (ft): 12718 Effective Depth TVD (ft): 9023 Junk (measured): Yes, Multiple Casing Length. Size Cement Volume MD TVD Conductor !Structural 110' 20" x 30" 8 cu ds Concrete 110' 110' Surface 2733' 13-3/8" 4185 cu ft Arcticset I I 2733' 2700' Intermediate 10847' 9-5/8" 1565 cu ft Class'G' 130 cu ft Arcticset I 10847' 8412' Production Liner 1065' 7" 480 cu ft Class'G' 10340' - 11405' 8034' - 8849' Liner 1798' 2-718" 79 cu ft Class'G' 10986' - 12784' 8517' - 9027' Perforation Depth MD (ft): 11710' - 12700' Perforation Depth TVD (ft): 9010' - 9022' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the forego' g is true and correct. Contact Mehrdad Nadem, 564-5941 Printed Name Greg Title Engineering Team Leader Prepared By Name/Number: Si nature Phone 564-4191 Date 0l ZS" o Terrie Hubble, 564-4628 ..Commission Use Onl Permit To Drill Number ~ ~~~ API Number: 50-029-20623-02-00 Permi A y See cover letter for Date: ~ ~ other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me~tha~ne, gas hydrates, or gas contained shales: ,~,/ Samples Req'd: ^ )fes Lr7No Mud Log Req'd: ,^,/Yes 11~ No ~~~ ~ct ~ ~ ~ S~ HZS Measures: Yes ^ No Directional Survey Req'd: I?0 Yes ^ No Other: `"(fl t'G~~ pts=c` 210 ~C ~.~35' ~~1>~,A~~~ 1 ~bC' ~ -n~r'p~s~c-~~~p~ ~~ ~ Date APPROVED BY T COMMIn SIONER Form 10-401 Revised 12!2005 O ~ ~ ~ ~ ~ A { Submit In Duplicate • Well Name: E-10B Planned Well Summary Horizontal Target Well E-106 Well Type Sidetrack Zone 1 B Producer Objective I API Number: I 50-029-20623-01 I a Current Status I E-10f~' is Shut in Estimated Start Date: April 1, 2008 Time to Com lete: 23.79 Surface Northin Eastin Offsets TRS Location 5976710 664449 354' FNL / 501' FEL 11 N, 14E, 6 Target Northin Eastin TVDss Offsets TRS Location 5976478 657906 8,980' 445' FNL / 2162' FEL 11 N, 13E, 1 Bottom Northin Eastin TVDss Offsets TRS Location 5976657 656663.99 8,980' 240' FNL / 1879' FWL 11 N, 13E, 1 Planned KOP: 9,830' MD / 7,573' TVDss Planned TD: 13,084' MD / 8,980' TVDss Ri Nabors 7ES CBE: 30.20' RTE: 58.70' E-10B Permit to Drill Application Page 1 Directional Program A roved Well Ian: W P5 (will update after gyro of F-27) Exit oint: 9,830' MD / 7,630' TVD Maximum Hole Inclination: 38.78° (tangent sail angle). 90.02° in the 6-1/8" horizontal section. Proximity Issues: Anti collision major risk criteria fails for well F-27. This well is scheduled for ro surve re ri . Surve Pro ram: MWD Standard + IFR /Cassandra/ MS Nearest Well: 550' (F-27) Nearest Property Line 5,000' (North) Geological Prognosis Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Formation (TVDss) (eet) (Yes/No) (Psi) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells THRZ -7430 above KOP LCU -7542 above KOP KOP -7570 TJE -7616 TJD -7890 TJC -8090 TJB -8226 No TSGR -8407 Yes TSAD -8519 Yes TCGL -8628 Yes BCGL -8693 Yes 23SB -8769 Yes 22TS -8819 Yes 3150 21TS -8875 Yes TZ1B -8929 20 Yes TDF -8972 20 Yes HOT -8977 20 Yes BSAD -9008 20 No Casing/Tubing Program Hole Size Casing / Tubin O.D. Wt/Ft Grade Conn. Length Top MD /TVD Bottom MD N/A 7" Tieback 26# L-80 TCII 9,680' Surface 9,680' 8-1/2" 7" 26# L-80 BTC-M 1,138' 9,680' / 7,520' 10,818' 6-1/8" 41/z" 12.6# L-80 IBT-M 2,416' 10,668' / 8,336' 13,084' Tubing 41/z" 12.6# 13Cr-80 Vam Top 10,668' Surface 10,668' E-10B Permit to Drill Application Page 2 Mud Program Hole Section /operation: 8-1/2" Intermediate Hole Type: Fresh Water LS ND Depth (ft) Density PV YP API FL mU30min MBT pH 9,830' (Milling) 10.4 15-22 20-40 6 - 8 <10 9 - 9.5 9,830' - 10,817' 10.4 - 10.5 12-22 18-28 4.0-6.0 <15 9-10 Hole Section /operation: 6-1/8" Production Interval Type: FloPro SF Depth (ft) Density PV YP LSRV MBT pH 9,930' - 13,084' 8.4 - 8.5 6 - 12 22 - 28 >20,000 < 4 ppb 9.0 - 9.5 Logging Program 9-5/8" Surface Casin Sample Catchers -None Drilling: N/A Open Hole: N/A Cased Hole: USIT/CBVCCL 8-1/2" Intermediate: Sample Catchers -None Drilling: Dir/GR/Res/MWD/PWD Open Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/ Den/Neu - Em to ee ABI ore uivalent if available Open Hole: None Cased Hole: None NOTE Tie into arent well eolo PDC to ,insure at least 200 feet of overla . E-10B Permit to Drill Application Page 3 Cementing Program Casin Strin 7", 26#, L-80, BTC-M x TC-II Tieback Slurry Design Basis: Lead slurry: None planned. Freeze protect from 3,000' to surface. Tail slurry: 6,680' of the 9-5/8" X 7" annulus to 3,000' MD with 0% excess. Pre-Flush 20 bbls of viscosified seawater Freeze Prot 77 bbls of diesel + 10 bbls excess Fluids Sequence /Volume: S acer None lanned Lead Slur None lanned 5 ~ Ems-. Tail Slur 174 bbls / 976 cf / 7 sxs Class `G', 15.8 ; 1.16 cf/sk. Note: It is the contingency to cement the 7" tieback to surface if the leak in the 9-5/8" is determined to be above the 13-3/8" shoe. Casin Strin 7", 26#, L-80, BTC-M Intermediate Liner Lead slurry: None Planned Slurry Design Basis: Tail slurry: fully cemented 8-1/2" x 7" annulus with 40% excess for the open hole section, lus 150' of overla lus 80' of 7", 26# shoe track. Pre-Flush None Planned Fl id S /V l S acer 30 bbls of 11.0 Mud PUSH ume: u s equence o Lead Slur N/A Tail Slur 47.4 bbls / 266 ft / 227 sxs Class `G', 15.8 ; 1.17 ft /sk. Casin Strin 4-1/2", 12.6#, L-80 IBT-M Production Liner Slurry Design Basis• Taol Slurry: Fully cement the 4-1/2" x 6-1/8" annulus, plus 150' of overlap with 40 /° excess for o en hole section, lus 80 ft. of shoe track. Pre-Flush 30 bbls of 10 MUDPUSH Fl id S /V l S acer None Planned u s equence ume: o Lead Slur None Planned Tail Slur 64.7 bbls / 363.2 ft / 162 sxs Class G 12.5 ; 2.24 ft /sk. 3`s" E-106 Permit to Drill Application Page 4 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics are currently on file with the AOGCC. BOP regular test frequency for E-10B will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Well Interval: 8'/i" intermediate interval Maximum antici ated BHP: 3,690 psi at 8,867' TVD Maximum surface ressure: 2,810 pSl (based upon BHP and a full column of gas from TD C~ 0.10 psi/ft) Calculated kick tolerance: Infinite Planned BOPE test pressure: 250 psi low / 3,500 psi high - 7 day test cycle until a window is milled in 9-5/8" casing. Once a window is milled a 14 day test cycle can commence. The VBR will not be changed to accommodate the 1,138-ft 7" drilling liner. Instead, the current and best practice of picking up a joint of drill pipe, with crossover to the casing thread, will be employed in the event of a kick. This practice provides two rams capable of closing on the pipe across the BOP stack instead of just a single 7". VBR will be changed before running the 7" tieback. Planned BOPE function test 250 psi low / 3,500 psi high 7 day test cycle (Pre drilling phase) 14 da test c cle (Drillin o erations) Well Interval: 6-1/8" production liner section Maximum antici ated BHP: 3,150 psi at 8,867' TVD Maximum surface ressure: 2,263 pSl (based upon BHP and a full column of gas from TD (~3 0.10 psi/ft) Calculated kick tolerance: Infinite Planned BOPE test ressure: 250 si low / 3,500 psi hi h Planned com letion fluid: 8.4 seawater / 7.Opp Diesel Planned BOPE test ressure: 250 si low / 3,500 si hi h -14 da test c cle. E-106 Permit to Drill Application Page 5 Faults Fault Details: E-10 B trajectory does not cross any mapped faults. The proposed E-lOB well will be located in northwestern E pad. No faults are expected to be encountered with the sidetrack. The structure in the vicinity of the proposed E-lOB well is moderately complex. The sidetrack location is west of the midfield graben and south of the E-K graben. There are a number of faults in the vicinity, including one regional fault just north and west of the E-lOB location. The polygon is relatively narrow however; as three additional faults are present 115 ft and 150 ft. south of the polygon and another is 70 ft north of the polygon edge. Near the end of the planned well a large regional east-west trending fault tips out 145 ft north of the polygon. The large throw of this fault may result in a larger than normal fracture zone around the tipout so it will be important to stay within the polygon near TD. The well cannot be extended because of the presence of a possible splay off the regional fault 180 ft west of the polygon. The proposed E-lOB well lies in a moderate risk province of the field for lost circulation at faults as documented by the WURD team. Eight loss circulation events were encountered in the Kingak and Ivishak section in 8 of the surrounding 18 wells as detailed below. Although no faults are expected to be encountered with the E- l OB sidetrack, the risk of loss circulation events is rated to be moderate because of the possibility of encountering fractures off of the regional fault to the north. Loss Circulation Events Well Type Loss (bbl) MD SSTVD Formation Fault? E-04A rig/coil 60 10600 -8982 Zone 2 No (seepage) E-15A Rig 31 10063 -8475 Zone 4 Yes (Cementing) E-27A Coil 6 10457 -8948 Zone 1 No E-28A Coil 50 10900 -8909 Zone 1 Yes E-28APB 1 Coil 105 10079 -8729 Zone 2 No (Fishing) E-29 Rig 1000 11161 -8405 Kingak No (Casing Pt) F-23A Coil 6 11950 -9002 Zone 1 Yes (Casing) F-27 Rig 12 10393 -8895 Zone 2 No E-106 Permit to Drill Application Page 6 • Fault Coordinates for Ma in X Y SSTVD Estimated fault throw, ft Fault #1 First Point 658261 5976831 BSAD 10-15' Fault #1 Second Point 658410 5976246 -9005 Down to W Fault #2 First Point (re Tonal fault) 654069 5976869 BSAD ~10' (tip) to 100' (middle fault block) Fault #2 Second Point (re Tonal fault) 656786 5976890 -9045 Down to N Fault #3 First Point 656417 5977181 BSAD ~5' Fault #3 Second Point 657193 5977011 -9050 Down to N Fault #4 First Point 657193 5977011 BSAD ~5' Fault #4 Second Point 657724 5976660 -9040 Down to SW Fault #5 First Point 656278 5976862 BSAD 10' (tip) to 30' Fault #5 Second Point 656427 5976666 -9045 Down to W Fault #5 Third Point 656547 5976432 Fault #6 First Point 657679 5976326 BSAD ~5' Fault #6 Second Point 657320 5975836 -9020 Down to NW Fault #7 First Point 656786 5976432 BSAD ~5' Fault #7 Second Point 657145 5976187 -9030 Down to SW Disposal Annular Injection: No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations are to be hauled to the Grind and Inject station at DS-04. Any metal cuttings should be sent to the North Slope Borough. All drilling and completion fluids and other Class II wastes are to be hauled to DS-04 Fluid Handling: for injection. All Class I wastes are to be hauled to Pad 3 for disposal. Hydrogen Sulfide Well Name H2S Level Date of Readin #1 Closest SHL Well H2S Level E-102 0 m N/A #2 Closest SHL Well H2S Level E-104 0 m N/A #1 Closest BHL Well H2S Level F-27A 10 m 06/14/06 #2 Closest BHL Well H2S Level F-23A 10 m 04/15/05 Max. Recorded H2S on Pad/Facili E-25 20 m 05/12/07 Other Relevant H2S Data E Pad is not an H2S drill site. H2S typically < 10 ppm. (H2S alarms from ri s, etc.) E-10B Permit to Drill Application Page 7 Pre-Riq Operations: 1. Bleed OA, IA & T to zero psi. PPPOT T & IC. Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage. 2. Plug and abandon the open perforations with 18 bbls of 15.8 ppg cement leaving the top of cement at 10,260' MD. Cement volume calculations is based on placing cement on top the CIBP at 12,185' MD. 3. On E-line drift the tubing to verify TOC. 4. Jet cut the 4-1/2" tubing one full joint above the 4-1/2" PBR seal assembly at 12,245'. Tubing tally is dated May 20, 1990. 5. Circulate the wellbore clean with seawater. Freeze protects the well with. diesel (2000' TVD). CMIT T x IA to 3500 psi for 30 minutes. 6. Perform MIT-OA to 2,000 psi for 30 minutes. 7. Set a back pressure valve in the tubing hanger. 8. Remove well house and flow line. Level the pad as necessary. Riq Operations: 1. MI / RU Nabors rig 7ES 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Pressure test MIT-OA to 2,000 psi for 30 minutes. 4. Set TWC and test from below to 1,000 psi for 30 minutes. ~~ 5. Nipple down tree. Nipple up and test BOPE to 3,500 psi. Pull TWC. 6. R/U. Pull 4-'h" tubing from the pre-rig cut at 10,200' MD. 7. On E-line, RIH with HES EZSV. Set bridge plug at 9,855' MD as required to avoid cutting a casing collar while milling the window. POOH. R/D E-line. 8. RU RTTS pack off and RIH to 3,500' MD. Perform a pressure test from above and below to 2,000 psi for 30 minutes. 9. Bleed the pressure. POOH and LD RTTS. 10. Change 9-5/8" pack-off. Test 9-5/8" pack-off seals and flange to 3,500 psi, or as recommended by FMC Rep. 11. P/U and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly on 4" drill pipe. Orient whipstock per Schlumberger Rep, and set on bridge plug. Shear off the whipstock. 12. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning the 13. Mill window in 9-5/8" casing at ± 9,830' MD, plus approximately 20' beyond middle of window. Circulate well bore clean. 14. Pull up into 9 5/8" casing and perform a formation integrity test. POOH. 15. M/U 8-'/z" BHA assembly. RIH, kick off and drill the 8'/z" intermediate section with LSND drilling fluid. 16. Drill ahead to the 7" liner point at top of the Sag River, as per the directional plan. Circulate the well -~(~~~j clean, short trip to THRZ or higher as needed. POOH. \ ` 17. MU and run 7", 26#, L-80, BTC-M liner to bottom on drill pipe. Circulate and condition the hole. ~~\ 18. Cement the entire 7" liner through the 8-1/2" hole and back 150' into the 9-5/8" casing to the liner top. ~~~ Set the hanger and packer, displace cement with mud. 19. Circulate bottoms up, POOH, VD liner running tool. 20. Test liner to 3,500 psi for 30 minutes after cement reaches its compressive strength. 21. Change out to 7" rams, and test. 22. MU &RIH with 7", 26#, L-80, TCII, liner tieback. 23. Sting in and establish seal, P/U to expose ports. 24. Cement the tieback to 3000' MD, bury the seal. The top of the 9-5/8" by 7" annulus will be freeze protected with diesel to the surface. Contingency: Cement might be brought to surface if the leak in the 9-5/8" is found to be shallow. 25. Test the tieback and plug to 3,500 psi for 10 minutes. 26. ND BOP and pick up BOP at wellhead. 27. Install and set weight on slips per FMC Rep. 28. Cut the 7" casing per FMC Rep, set BOP back. 29. Install second tubing spool with secondary 7" casing in bottom. 30. Test casing hanger flange and pack-off seals to 80% of Casing Collapse or Flange rating (which ever is lower). E-10B Permit to Drill Application Page 8 i i 31. NU and test BOP. 32. Change out rams to variable and test. 33. Pick up drill pipe and stand back. 34. POOH for directional drilling BHA. 35. M/U the first 6-%8" Dir/GR/Res assembly with an insert bit. 36. RIH to drilling the tieback float equipment, test to 3,500 psi for 10 minutes, and record. 37. Drill out of cement and tieback float equipment to the 7" liner float equipment. Test the liner to 3,500 psi for 30 charted minutes. 38. Displace to 8.4 ppg Flo Pro Fluid. 39. Drill out of cement and float equipment to shoe. 40. RIH, and drill out the 7" shoe plus ~20' new formation, pull up into the shoe and perform a formation integrity test. 41. Drill the 6-1/8" production interval as per directional plan to end of the build section. 42. POOH for bit. 43. POOH, PU second BHA with a PDC bit. 44. RIH, drill ahead to TD. 45. POOH. UD BHA. 46. MU and RIH to bottom with 4-1/2", 12.6#, L-80 solid liner. This will include 150' liner lap inside the 7" drilling liner. Cement the liner. 47. Set liner top packer and displace well to clean seawater above the liner top. a. A pert pill will be left in the 4-1/2" liner. 48. POOH, VD LRT. 49. Pressure test casing and liner to 3,500 psi for 30 minutes. 50. RU DPC pert guns, RIH and perforate. Perf intervals to be supplied by asset. 51. R/U and run a 4~h", 12.6#, 13Cr, VamTop tubing completion, stinging into the 4-1/2" liner tie back sleeve. 52. Space out and make up tubing hanger per FMC Rep. 53. Land the tubing hanger, and run in lock down screws. 54. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 55. Set a BPV. 56. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 57. Freeze protect the well to 2,200' TVD. Secure the well. 58. RD and Move Off. Post-Rig Operations: 1. RU E-line. Pull the BPV. 2. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 3. Replace the DCK shear valve with a dummy GLV. 4. Install well house and instrumentation. E-10B Permit to Drill Application Page 9 ~ i E-lOB Potential Drilling Hazards (Post on Rig) • Pre-job HAZOP's and Safety meetings are recommended when there is a clear change in work scope. If at any time things don't feel or look right, STOP the job and discuss the situation before making the next move. • Flash Points o Dead Crude= <40degF o Methanol (neat)= 52degF o Diesel=100degF • Hydrogen Sulfide o Although E-106 is not an H2S drill site. It is recommended to use extra caution while working. Standard Operating Procedures for H2S precautions should still be followed at all times. • Bottom Hole Pressure 0 3,150 psi @ 8,867' TVD • Maximum anticipated wellhead pressure: 0 2,263 psi w/full column of gas • Potential for loss circulation o The proposed E-10Bwell is not expected to cross any mapped faults. As such, potential for loss circulation is low for this well. • Close Approaches o F-27 - This well scheduled to gyro surveyed pre-rig. E-10B Permit to Drill Application Page 10 E-10B ~ 2,200` - 4-1/2" BKR Land Nipple 2,512` - 9-5/8" DV PKR 2,733` - 13-3/8" 72#, L-80, ID-12.347" 3,233` - TOC 9,680` - 7" 26#, L-80 TCII Tieback 9,680` 9-5/8" x 7" BKR PKR 9,830` - KOP 9,855` - 9-5/8" EZSV ~'~ ~. a ,. ~. i TREE = 6" CNV WELLHEAD = FMC ACTUATOR AXELSON KB. ELEV = 60.53' BF. ELEV = KOP = Max Angle = Datum MD = Datum TVD = 8800' SS 10,612` - 4-1/2" BKR X Nipple 10,627` - 7" x 4-1 /2" BKR S3 Packer 10,652` - 7" 4-1 /2" BKR XN Nipple 10,622` - 4-1/2" BKR XN Nipple 10,667` - 4-1/2" - 13C-80 VAMTOP Tubing 10,667` - W LEG 10,667` - 7" x 5" ZXP w/10' TBS Hanger (Liner Top) 10,817` - 7", 26#, L-80, BTC-M PBTD 13,004` MD TD 13,084' MD .. ^;... '2" 12.6#, L-80, IBT-MOD Station Depth* Depth` Mandrel Vumber TVD MD Size #3 3500' 3775' 4-1/2" x 1" #2 5900' 7340' 4-1/2" x 1" #1 8000' 10269 4-1/2" x 1" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff 08/18/81 ORIGINALCOMPLETION 09/05/03 BJM/KK SET4-1/2"ECLIPSE PATCH WELL: E-10A 05/26/99 JAM SIDETRACK (E-10A) 09/17/03 CMO/TLP PFRF ANGLE CORRECTION PERMff No: 1990450 03/05/02 RN/TP CORRECTIONS 09/21/06 DRF/PAG SET PLUG, PULL ECLIPSE PKR API No: 50-029-20623-01 06/02/03 CJS/TLP MILL /PUSH CIBP 07/22/07 JSR/PJC PULL PLUG/ SET LTTP (06/17/07 ) SEC 6, T11 N, R14E, 353' SNL & 500' W~ 06/19/03 JCM/TLH GLV GO 08/13/03 JCMITLH GLV GO BP Exploration (Alaska) TREE = 6" CM/ WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 60.53' BF. ELEV = 32.36' KOP = 2100' Max Angle = 94 @ 12515' Datum MD = 11420' Datum TV D = 8800' SS 13-3/8" CSC, 72#, L-80, ID = 12.347" Minimum ID = 3.0" @ 10986' BKR GS SLEEVE E-10A TOP OF 7" LNR ~ 10340' 9-5/8" CSC, 47#, L-80, ID = 8.681" 10847' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.953" 11406' PERFORATION SUMMARY REF LOG: SWS NMID-GR ON 05/24/99 ANGLE AT TOP PERF: 78 @ 11710' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 4 11710 - 11730 O 04/23/01 2" 4 11780 - 11830 O 05/26/99 2" 4 11920 - 12019 O 05/26/99 2" 4 12070 - 12250 C 08/12/00 2" 4 12320 - 12700 C 08/12/00 4-1/2" BRIDGE PLUG 11474' PBTD 11758' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11800' SAFETY NOTES: 70° @ 11652' & 90° @ 12006' 20$2' )~ 4-112" SSSV CAMCO LANDING NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 3146 6008 3000 5000 36 50 CAM CAM DMY '*DMY RK RK 0 0 08/12/03 08/12/03 "" STATION #1 = DMY HAS IXTt]VDED PACKING 10195' 4-1/2" PKR SWS NIP, ID = 3.813" 10245' 4-112" BKR PBR SEAL ASSY, ID = 4.00" 10268' 9-5/8" X 4-1/2" BKR RET HB PKR, ID = 4,0" 10986' -j BKR GS SLEEVE, ID = 3.00" 11263' -11267' TUBING PUNCH MILLOUT WINDOW 11406' - 11420' BAKER ANCHOR PKR @ 11420' 11418' RA TAG UNKNOWN FISH - ECLIPSE PKR SLIP (09121/06) 12185' 2-718" BAKER CIBP \ MILLED /PUSHED DOWN 06/02/03 PBTD 1 12718' r 2-7/8" TBG, 6.4#, L-80, .00579 b/pf, ID = 2.441" 12784' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT 08/18/81 ORIGINAL COMPLETION 09/21/06 DRF/PAC SET PLUG, PULL ECLIPSE PKR WELL: E-10A 05!26199 JAM SIDETRACK (E-10A) 07/22/07 JSR/PJC PULL PLUG/ SET' LTTP (06/17107 ) PERMff No: 1990450 03/05/02 RN/TP CORRECTIONS 01/03/08 DTR/TLH LTTP PULLED (12129/07) API No: 50-029-20623-01 08/13/03 JCMITLH GLV C/O SEC 6, T11 N, R14E, 353' SNL & 500' WEL 09/05/03 BJIvYKK SET 4-1/2" ECLIPSE PATCH 09/17/03 CMO/TLP PERFANGLECORRECTION BP Exploration (Alaska) COMPANY DETALLS .may ,. BP Amoco fi'4•-°'t~ Iculation Method: Minimum Curvature Error System: LSCWSA Scaa Mehod: Tav Cylinder North Error Surface: Elliptical +Casing CASING DETAILS No. TVD MD Name Size I 8465.50 10820.70 7" 7.000 2 9038.50 13069.33 41;2" 4.500 HALLIBURTON Sperry Oriliing 8ervicez ~ "~_. 7000 ~`` _ _I _ l ~._ ~. REFERENCE INFORMATION SURVEY PROGRAM Co-ordinate (N;E)Reference: Well Cenne: E-10, Ttve North th Fm Depth To Survey/Plan Tool plan: Plan E-106 WP 5(E-IOiPlan E-IOB) Vertical (TVD) Reference: 3(1+2%.5 SR.SII Section (VS) Reference: Slot- l0 (01111N,ILUUE) %3(LINI 1311%9.33 Planed: Plan E-108 WP_5 V7 MWD*IFR+MS Created By: Sperry Drilling Date: 2%612008 Measured Depth Reference: 311+2%.5 SBSU Calculation Method: Minimum Curvature WELL DETAILS Name +N/-S +El-W Northing Fasting Latitude Lory;itude Slot E-IU 3507.14 1986.63 5976710.1W 664449.W 7U"2U'33.624N 148"39.55.017W 10 SECTION DETAILS Sec MD Inc Azi TVD +Ni-S +Ei-W DLeg TFace VSec Target 1 9830.00 38.51 268.53 7632.03 -297.26 -5277.61 0.00 0.00 5272.51 2 9850.00 38.78 272.35 7647.65 -297.17 -5290.09 12.00 85.00 5284.99 3 10055.55 31.83 279.98 7815.36 -285.11 -5407.98 4.00 150.68 5403.05 4 11172.65 31.83 279.98 8764.53 -183.01 -5988.15 0.00 0.00 5984.69 5 11734.41 88.00 279.4(1 9035.01 -104.84 -6448.39 10.00 -0.63 6446.07 - 6 11834.41 BB.00 279.46 9038.50 -88.42 -6546.97 0.00 0.00 6544.88 E-10B Tl 7 11654.57 90.02 279A6 9038.85 -85.11 -6566.86 10.00 0.00 6564.82 8 13089.33 90.02 279.46 9038.50 117.80 -7784.83 0.00 0.00 7785.72 E-108 T2 g ' - '_t-- ~ ----..._~._.... -T - TJD ~, ~ . - _ _ __._ I--- r _... _- _.~. - i -. i ~ i ..~- - ~:-- TJB - _, - t~ - - ~ ._ _ ~ 1 u 8500 ~ !!! 2 T - - ~ ' 7„ F. ~.. TSA FORMATION TOP DETAILS 1 I No. TVDPa[h MDPath Formation ~_._ __ __ ,__ ', 1 8038.50 10318.15 T]D _T_ ,_ ~ _- - ' 2 8148.50 10447.61 TJC ~ _ E-1 0 (E-IOA) ''- 3 8286.50 10610.03 TJB _ _ ~ ~ 4 8465.50 10820.70 TSGR _ 5 8577.50 10952.52 TSAD _ I _ _. _. L - 7 5751.50 I 1157.31 7 7 BCGL ~ ~ - 8 8987.50 11518.56 TZIB i 9 9030.50 116 9. 3 TDF 10 9038.50 11834.41 HOT TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape E-108 Geo-poly 9038.50 117.80 -7784.83 5976657.00 656663.99 Polygon E-108 TI 9038.50 -88.42 -6546.97 5976478.00 657906.00 Point E-IOB T2 9038.50 117.80 -7784.83 5976657.00 656663.99 Point _~ 6000 6500 7000 Vertical Section at 270.87° [SOOftlin] ~~ 7500 8000 1 r • • COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM BP Amoco Co-ordinate (N/E) Reference: Well Centre: E-10, True North Depth Fm Depth To Survey/Plan Tool plan: Plan E-IUB WP_5 (E-IU/Plan E-1081 Vertical (TVD) Reference: 311+2N.5 5%.511 Calculation Method: Minimum Curvature Section (VS)Reference: Slot-111 (ILUIIN,ILOIIE) 98311.1111 1311%9.33 Planed: Plan E-IUB WP_5 V7 MWD+IFR+MS Created By: Sperry Drilling Date: 2/6/2008 Error System: ISCWSA MeasureA Depth Reference: 311+2%.5 5%.50 Scan Method: Tray Cylinder North Calculation Method: Minimum Curvature WELL DETAILS Error Surface: Elliptical +Castng Warning Method: Rules Based Name +N/-S +E/-W Northing Fasting Latitude Longitude Slot H~~~'~. `~~on' E-10 3507.14 1986.fi3 597671U.W 664449.W 70"211'33.fi24N 148"39'SS.U17W 10 V ' V TARGET DETAILS Sperry Drilling Services - - - ~ Name 7VD +Ni-S +Ei-W Northing Easing Shape _ __._. __ ~- - - - ~ - ~ ~ ~ ~ ~ '---- ~ E-IOB Geo-poly 9038.50 117.80 -7784.83 5976657.00 656663.99 Polygon ~ _ ~ - .-- E-IOB TI 9038.50 -88.42 -6546.97 5976478.00 657906.00 Point _ ~ ~.... - ~ ~- ~ ~ - ~... .!_ E-lOB T2 9038.50 II7.80 -7784.83 5976657.00 656663.99 Point 637 _ .- __ - _ __ _ ~~ ~. _-~ ~ ~ - - ~ __ ~ ~ St ' Dir l0"~ 100' :11172.65' ' D, 8764.53'TVD ~ End Dir :10055.55' , 7815.38' TVD ' l ~ ! '. - ~ - -- - - ~ ~ ~ - - - - - - - - ~ - nd Dir : 11734.41 MD, 9 TVD 35.01 ~ , --- 318 -- Total D th :13089.33' MD, 9038. TVD -. ~ _ _ .-.. - ~1. _. ~ . S[art Dir 10"i 100' : 1 1834.41' MD, 9038.5'TVD .. ' __.. - ' -~ --~ +~ ~ 'T- i 1. ~~~~ --- T-- End Dir 11854.57 D, 91138.85' TVD I ~ _ ~ f- T ,~ 4 1.2" -, --F 106 o-poly- _-_ _ ~ -- ' 1 - _ . .. i ~ --T- -. - ~ `Z ~~ ~ ~ ~- - - ". 1 1 ' ' ' - - _ ~ Start Dv 4 10 MD, 7647.65 7 V ~ 9850 ~ _. _ ' _ -• - '-ice:.: , o N Plan - -IOB - ~ ,_ I ~- _ -10 (E-I -. ) - .. -- 9000 '~ Star Dir 7^ __ "%100' :9830' MD, 7632 ,_. ~ ~+-- 3'TVD ! - . ... - - .. _.. _ _ E-10 TI 90 _.__ 0 8500 - -~----... ._.. ..._ .._~._..-~_-~ - -318 _ _ -'-- -__-- -- 000 ----. 8000 7500 _~ - _ ~ ~ - .~_. -. ~~~-- - E-10 (E-IOA) - - - CASING DETAILS ~ - ~ -~ -~ ~ ~ ~ ~ ~ -637 No. TVD MD Name Siu 8465.50 10820.70 7" 7.000 _ 2 9038.50 13089.33 4 1/2" 4.500 FORMATION TOP DETAILS - - - - ~ -~ - -- --. _.-- - - - Y - SECTION DETAILS No. TVDPaIh MDPath Formation - . ~ - - I --- ~ }-r--~--- ~ - _. -_. _ - - - - - - Su MD Inc Azi TVD +N/-S +FJ-W DLcg TFace VSec Targct I 8038.50 10318.15 T1D - 50 10447.61 T1C 2 8148 - - ~ ~ - I 9%311.W 38.51 2fiN.53 7632.03 -297.26 -5277.61 U.W O.W 527251 . 03 TJB 50 10610 3 8286 2 9%SU.W 3%.78 272.35 764Zfi5 -297.17 -5290.09 12.00 %S.OU 5284.99 . . 4 846550 10820 70 TSGR _ ~ 3 IIHI55.55 31.%3 27998 7%15.3% -285.11 -54117.98 4.W 150.6% 5403.05 . 50 1095252 TSAD 5 8577 4 11172.fi5 JL%3 279.98 %764.53 -1 N3.111 -59%%.IS O.W O.W 5984.69 . 6 8686.50 11080.81 TCGL I ( 5 11734.41 %8.00 279.46 9035.111 -IIM.N4 -6448.39 10.011 -0.63 6445.07 41 %8.00 279.46 903%.50 -%%.42 -6546.97 0.011 U.W 6544.88 E-IUB TI 6 11834 7 8751.50 11157.31 BCGL . 7 IIR-54.57 90.02 279.46 903%.%5 -%5.11 -6566.%6 111.00 QW 6554.82 8 8987.50 11518.56 TZIB % 130%9.33 90.02 279.46 9038.50 117.811 -7784.83 O.W ILW 7785.72 EIUB T2 9 9030.50 11679.73 TDF _73 23 -7005 -6 686 -6 10 9036.50 11834.41 HOT Wes[(-);East( Sperry-Sun BP Planning Report Company: BP Amoco Date: 2/6/2008 Time: 11:23:39 Page:.-... 7 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-1Q Trtae North Site: PB f Pad Vertical (TVD) Reference: 30+28:5 58.5 Well: E-t0 Section (VS) Reference: Well (OOON,O.OOE,270~87Azi) Wellpath: Plan E-106 Survey Calculation Method: Minimum. Curvature Db: QraGe Plan: Plan E-10B WP_5 Date Composed: 12/4/2006 Version: 7 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB E Pad TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5973160.88 ft Latitude: 70 19 59.134 N From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.24 deg Well: E-10 Slot Name: 10 E-10 Well Position: +N/-S 3507.14 ft Northing: 5976710.00 ft Latitude: 70 20 33.624 N +E/-W 1986.63 ft Easting : 664449.00 ft Longitude: 148 39 55.017 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 10820.70 8465.50 7.000 8.500 7" 13089.33 9038.50 4.500 6.125 4 1 /2" Formations MD TVD Formations Lithology Dip Angle Dip Direction. ft ft deg deg 0.00 THRZ 0.00 0.00 0.00 BHRZ/THE 0.00 0.00 10318.15 8038.50 TJD 0.00 0.00 10447.61 8148.50 TJC 0.00 0.00 10610.03 8286.50 TJB 0.00 0.00 10820.70 8465.50 TSGR 0.00 0.00 10952.52 8577.50 TSAD 0.00 0.00 11080.81 8686.50 TCGL 0.00 0.00 11157.31 8751.50 BCGL 0.00 0.00 11518.56 8987.50 TZ16 0.00 0.00 11679.73 9030.50 TDF 0.00 0.00 11834.41 9038.50 HOT 0.00 0.00 0.00 BSAD 0.00 0.00 Targets Map Map <-- Lahtude -> <-- Longitude --> Name Description TVD +N/-S +E/-W 1Vorthing Fasting Deg Min Sec. Deg Min Sec .Dip, Dir. ft ft ft ft ft E-106 Geo-poly 9038.50 117.80 -7784.83 5976657.00 656663.99 70 20 34.742 N 148 43 42.445 W -Polygon 1 9038.50 -171.21 -6329.72 5976400.00 658124.99 70 20 31.914 N 148 42 59.928 W -Polygon 2 9038.50 -94.20 -6648.13 5976470.00 657804.99 70 20 32.668 N 148 43 9.231 W -Polygon 3 9038.50 36.23 -7805.63 5976575.00 656644.99 70 20 33.940 N 148 43 43.050 W -Polygon 4 9038.50 210.98 -7791.79 5976750.00 656654.99 70 20 35.659 N 148 43 42.651 W -Polygon 5 9038.50 124.76 -7053.45 5976680.00 657394.99 70 20 34.818 N 148 43 21.078 W -Polygon 6 9038.50 21.65 -6685.60 5976585.00 657764.99 70 20 33.807 N 148 43 10.329 W -Polygon 7 9038.50 -36.78 -6301.76 5976535.00 658149.99 70 20 33.236 N 148 42 59.114 W E-106 T1 9038.50 -88.42 -6546.97 5976478.00 657906.00 70 20 32.726 N 148 43 6.276 W E-10B T2 9038.50 117.80 -7784.83 5976657.00 656663.99 70 20 34.742 N 148 43 42.445 W Sperry-Sun BP Planning Report Company: BP Amoco Date: 2/6/2008 Time: 11:23:39 `Page: 2 Field:. Prudhoe Bay Co-ordinate(NE) Reference: W e1L• E-10, True North Site: PB E Pad Vertical (TVD) Reference: 30+28.5.58.5 Well: E-10 Section (VS) Reference: Weil;(O.OON,O.OOE,270.87Azi) Wellpatb': Plan E-10B Survey Caleuladon Method: Minimum Curvature ` Db: OraGe Plan Section Information MD Inch Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/1001t deg/100ft deg 9830.00 38.51 268.53 7632.03 -297.26 -5277.61 0.00 0.00 0.00 0.00 9850.00 38.78 272.35 7647.65 -297.17 -5290.09 12.00 1.36 19.10 85.00 10055.55 31.83 279.98 7815.38 -285.11 -5407.98 4.00 -3.38 3.71 150.68 11172.65 31.83 279.98 8764.53 -183.01 -5988.15 0.00 0.00 0.00 0.00 11734.41 88.00 279.46 9035.01 -104.84 -6448.39 10.00 10.00 -0.09 -0.63 11834.41 88.00 279.46 9038.50 -88.42 -6546.97 0.00 0.00 0.00 0.00 E-10 6 T1 11854.57 90.02 279.46 9038.85 -85.11 -6566.86 10.00 10.00 0.00 0.00 13089.33 90.02 279.46 9038.50 117.80 -7784.83 0.00 0.00 0.00 0.00 E-10 6 T2 Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS. MapN MapE TooUCo ft deg deg ft ft ft ft ft deg1100k ft ft 9830.00 38.51 268.53 7632.03 7573.53 5272.51 -297.26 -5277.61 0.00 5976297.06 659179.55 Start Dir 1 9850.00 38.78 272.35 7647.65 7589.15 5284.99 -297.17 -5290.09 12.00 5976296.89 659167.07 Start Dir 4° 1 9900.00 37.05 273.98 7687.10 7628.60 5315.68 -295.48 -5320.76 4.00 5976297.90 659136.37 MWD+IFR 10000.00 33.66 277.65 7768.66 7710.16 5373.30 -289.70 -5378.30 4.00 5976302.42 659078.72 MWD+IFR 10055.55 31.83 279.98 7815.38 7756.88 5403.05 -285.11 -5407.98 4.00 5976306.35 659048.94 End Dir : 1 10100.00 31.83 279.98 7853.15 7794.65 5426.20 -281.05 -5431.07 0.00 5976309.91 659025.78 MWD+IFR 10200.00 31.83 279.98 7938.11 7879.61 5478.26 -271.91 -5483.00 0.00 5976317.90 658973.66 MWD+IFR 10300.00 31.83 279.98 8023.08 7964.58 5530.33 -262.77 -5534.94 0.00 5976325.90 658921.54 MWD+IFR 10318.15 31.83 279.98 8038.50 7980.00 5539.78 -261.11 -5544.36 0.00 5976327.35 658912.08 TJD 10400.00 31.83 279.98 8108.05 8049.55 5582.40 -253.63 -5586.87 0.00 5976333.90 658869.42 MWD+IFR 10447.61 31.83 279.98 8148.50 8090.00 5607.19 -249.28 -5611.60 0.00 5976337.71 658844.60 TJC 10500.00 31.83 279.98 8193.01 8134.51 5634.46 -244.49 -5638.81 0.00 5976341.90 658817.30 MWD+IFR 10600.00 31.83 279.98 8277.98 8219.48 5686.53 -235.35 -5690.74 0.00 5976349.90 658765.18 MWD+IFR 10610.03 31.83 279.98 8286.50 8228.00 5691.75 -234.43 -5695.95 0.00 5976350.70 658759.95 TJB 10700.00 31.83 279.98 8362.94 8304.44 5738.60 -226.21 -5742.68 0.00 5976357.90 658713.06 MWD+IFR 10800.00 31.83 279.98 8447.91 8389.41 5790.67 -217.07 -5794.61 0.00 5976365.89 658660.94 MWD+IFR 10820.70 31.83 279.98 8465.50 8407.00 5801.45 -215.18 -5805.37 0.00 5976367.55 658650.15 7" 10900.00 31.83 279.98 8532.88 8474.38 5842.73 -207.93 -5846.55 0.00 5976373.89 658608.82 MWD+IFR 10952.52 31.83 279.98 8577.50 8519.00 5870.08 -203.13 -5873.83 0.00 5976378.09 658581.45 TSAD 11000.00 31.83 279.98 8617.84 8559.34 5894.80 -198.79 -5898.48 0.00 5976381.89 658556.70 MWD+IFR 11080.81 31.83 279.98 8686.50 8628.00 5936.88 -191.40 -5940.45 0.00 5976388.35 658514.59 TCGL 11100.00 31.83 279.98 8702.81 8644.31 5946.87 -189.65 -5950.42 0.00 5976389.89 658504.58 MWD+IFR 11157.31 31.83 279.98 8751.50 8693.00 5976.71 -184.41 -5980.18 0.00 5976394.47 658474.71 BCGL 11172.65 31.83 279.98 8764.53 8706.03 5984.69 -183.01 -5988.15 0.00 5976395.70 658466.72 Start Dir 1 11200.00 34.56 279.93 8787.42 8728.92 5999.48 -180.42 -6002.90 10.00 5976397.96 658451.92 MWD+IFR 11300.00 44.56 279.78 8864.42 8805.92 6062.31 -169.54 -6065.57 10.00 5976407.46 658389.03 MWD+IFR 11400.00 54.56 279.68 8929.20 8870.70 6137.41 -156.69 -6140.49 10.00 5976418.66 658313.85 MWD+IFR 11500.00 64.56 279.60 8979.80 8921.30 6222.51 -142.27 -6225.38 10.00 5976431.22 658228.67 MWD+IFR 11518.56 66.42 279.59 8987.50 8929.00 6239.20 -139.46 -6242.03 10.00 5976433.67 658211.97 TZ1 B 11600.00 74.56 279.54 9014.68 8956.18 6315.02 -126.71 -6317.66 10.00 5976444.75 658136.08 MWD+IFR 11679.73 82.53 279.49 9030.50 8972.00 6392.21 -113.81 -6394.67 10.00 5976455.96 658058.81 TDF 11700.00 84.56 279.48 9032.78 8974.28 6412.12 -110.49 -6414.53 10.00 5976458.84 658038.88 MWD+IFR 11734.41 88.00 279.46 9035.01 8976.51 6446.07 -104.84 -6448.39 10.00 5976463.74 658004.91 End Dir : 1 1 11800.00 88.00 279.46 9037.30 8978.80 6510.88 -94.07 -6513.05 0.00 5976473.09 657940.03 MWD+IFR 11834.41 88.00 279.46 9038.50 8980.00 6544.88 -88.42 -6546.97 0.00 5976478.00 657906.00 E-106 T1 11854.57 90.02 279.46 9038.85 8980.35 6564.82 -85.11 -6566.86 10.00 5976480.87 657886.05 End Dir : 1 1 11900.00 90.02 279.46 9038.84 8980.34 6609.74 -77.64 -6611.67 0.00 5976487.35 657841.08 MWD+IFR 12000.00 90.02 279.46 9038.81 8980.31 6708.62 -61.21 -6710.31 0.00 5976501.62 657742.11 MWD+IFR 12100.00 90.02 279.46 9038.78 8980.28 6807.49 -44.78 -6808.95 0.00 5976515.88 657643.14 MWD+IFR 12200.00 90.02 279.46 9038.75 8980.25 6906.37 -28.34 -6907.59 0.00 5976530.15 657544.17 MWD+IFR 12300.00 90.02 279.46 9038.72 8980.22 7005.25 -11.91 -7006.23 0.00 5976544.41 657445.20 MWD+IFR 12400.00 90.02 279.46 9038.69 8980.19 7104.13 4.52 -7104.87 0.00 5976558.67 657346.23 MWD+IFR gent • Sperry-Sun BP Planning Report Company: BP Amoco Dater 2/6/2008 Time: 11:23:39 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-10, True North Site: PB E Pad Vertical (TVD) Reference: 30+28.558.5 Well: E-1 0 Section (VS) Reference: Well (O.OON,000E,270.87Azi) Wellpath: Plan E-10B Survey Calculation Method: 'Minimum Curvature Db: trade Survey MD lncl Azim TVI) Sys TVD VS N/S E/W DLS, MapN MapE TooUGo ft deg. deg ft ft ft ft ft deg/100ft ft ff 12500.00 90.02 279.46 9038.67 8980.17 7203.01 20.95 -7203.51 0.00 5976572.94 657247.26 MWD+IFR 12600.00 90.02 279.46 9038.64 8980.14 7301.88 37.39 -7302.15 0.00 5976587.20 657148.29 MWD+IFR 12700.00 90.02 279.46 9038.61 8980.11 7400.76 53.82 -7400.79 0.00 5976601.46 657049.32 MWD+IFR 12800.00 90.02 279.46 9038.58 8980.08 7499.64 70.25 -7499.43 0.00 5976615.73 656950.35 MWD+IFR 12900.00 90.02 279.46 9038.55 8980.05 7598.52 86.68 -7598.08 0.00 5976629.99 656851.38 MWD+IFR 13000.00 90.02 279.46 9038.53 8980.03 7697.40 103.12 -7696.72 0.00 5976644.26 656752.41 MWD+IFR 13089.33 90.02 279.46 9038.50 8980.00 7785.72 117.80 -7784.83 0.00 5976657.00 656663.99 E-10B T2 lent Name ~N.'-5 1:-Ill i5U].I4 wHU-IH:rAlls ,U-W hl.inhmH Fd~g IamuJe L~ug¢uJe SL~I IYN6.6J SY]6]II)gl ldr444`1W ]020'i~624N 10.5 ?'YSS.UIJW IU pN71LOLLISION SETTINGS IratelP~lation Method:MD Interval: 25.00 D¢Ptb flange Fmm: y%311.01) ~r0: IJU%y.33 Max.lmlml Range: ISIIfi,U% Reference: Plan: Plan E-TUB WP_5 cTJMPANV urrnlls dP Am•ao ('alruYab.~u MYdW-hlinim~w C'unalua' ~~no`roi ~~l: ISui,(r1'Nk^NUM N ul siuWm: EWIx¢al ~ C1uivg w~mx Melm•a: w14. datia suxvHV Pua;NAh1 IhP~Fm UoP1A 1'o SurveY/Plm Tirol ')X?11110 IJIIX'l.?i PImaJ: PLe~IUd WP SV] MWU~IPN~MS W d1.IJ`Al d I11rAH.5 I(Q From Colour To MD PW°1~-tlitl 0 ----- 250 rem welgww: a-m 150 250 500 Ile na MU: '1X10 110 500 --~ 750 unl~: JH ass SXSUN wa' 33 0 7so looo . V.\~tiWm UnCY IN4m ScvUUg loo0 1250 Al~k N/-ti 1~-W Flom IVU 125 ~~ 1250 1500 271).%] II IXI Il fxl '_NSU 1500 5500 5500 5750 5750 6000 6000 -- 6250 ""dND 100 6250 6500 h-11111--IUI. N111X1U)w5 L-10lF-luny. Nf)FNK(IKS ' 6500 6750 1 Mapn Kivk L-IS Ui-15( 6750 7000 1 2XA IF-2XA1 hl:~h'r Nixk '-- f'_N IL-2X7. Mw'~I NUt 7000 7250 L:2YIF 2Y1 MaN' w.,k -- Y-f14 [F UJA1. Mahal Nixk 30 \ 0 7zso 7500 - F-U4IF-II4A1`tlll h1aWl wsk 75 \ 7500 7750 - 1-tin IF-2inl. hiHr"1 w.k - t n m-2)1. M„n'r uuk 7750 8000 1'L F-IUH \ p00~ 0 8250 1'I:m 1'-I UH WI' S 250 \ 8500 \ 9 0 8 0 9000 0 0 9250 0 9500 -- - 9750 9 10000 Q 270 7V ~5 ~~' ~- O 50 $~ ' F-27 Will Be gyroed, DOES NOT PASS 75 2~ MAJOR RISK 120 '~ • t~ V e 100 V Pre Plans Removed. `e ~ ~ n ~ See AC Scan for Plans ~ Parents Profile @ No Errors I ZS XFC'TN)N UFTAILS ties hID Lu Aii TVU •N'-ti ~1:'-W ULeg TFaee VSIx Ta1Pn 21 50 I '/X]0110 3X.51 2fitl.5J ]4i Z.UJ -_'Y7^_6 -527].61 0.00 0.00 i'_)'_51 ''/XSII.L51 1X.]X 273 i5 )647.65 --'_')].I) -i2/U.UY 1_'.fp XS.W 5'_X4. P7 C 11X15555 ?I.XJ 2TI.'1X ]X153N -'_X5.11 -5411].YX 4.W 150.6X 5411JLi I JO 4 11172.65 11.X? 27'/.'/X XJ64.5J -IXJ 111 -SYXX.15 0.00 U.IMI >YXi 6'I J 11)14.41 XF.gI 2)Y.46 YII15lll -104%4 {.14XJY 10.011 -0.61 644f, 11'! f, 11X]4.41 h'X Ix] 2)Y.46 •/01X511 -XX d2 -6546.Y7 U.UII n.on 6544.XX F-10H TI 160 ) 11X54.5) •Nl ll_' 2)'1.4fi `q?X.NS -X5.11 -l51~(~X6 IU INI U.W !ul.1 X2 IpO h IiI1N)?? YI1112 2]Y.46 %IiX511 11)TYl -)]N4,Xl Il Ull 111X1 J]XS ]^_ 1:-IIIH'r2 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50{ilin] u • Sperry-Sun Anticollision Report Company: BP Amoco Dates 2/6/2008 Time: 10:28:52 Page: 1 Field: Prudhoe Bay Reference Site: PB E Pad ` Co-ordinate(NE) Reference: Well: E-10, True North .Reference Well: E-1-0 Vertical (TVD) Reference: 30+28.5 58.5 Reference Weppath: Plan E-106 Db: :Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 1 00/1000 of reference -There are TIreY~iTea~mdls in this fi2h71cipal Plan & P LANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Erro r Model: ISCWSA Ellipse Depth Range: 9830.00 to 13089.33 ft Scan Method: Trav Cylinder North Maximum Radius: 1506.08 ft Error Surface: Ellipse + Casing Survey Program for Definitive Weppath Date: 12/4/2006 Validated: No Version: 1 Planned From To Survey Toolcode Tool N ame ft ft 97.97 9830.00 E-10A GYD-CT-CMS Gyrodata (97.97-1 09970il9p(•4aT-CMS Gyrodata cont.casing m/s 9830.00 13089.33 Planned : Plan E-10B WP 5 V7 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD TVI) Diameter Hole Size Name ft ft in in 10820.70 8465.50 7.000 8.500 7" 13084.40 9038.50 4.500 6.125 41/2" Summary <_~_ r_ Offset Weppath --- ----> Reference Offset Ctr-Ctr No-Go Allowable Site Well Weppath MD MD Distance Area. Deviation Warning ft ft ft ft ft PB E Pad E-10 E-10 V6 9847.96 9849.97 0.33 0.92 -0.59 FAIL: NOERRORS PB E Pad E-10 E-10A V4 9847.96 9850.00 0.33 0.81 -0.48 FAIL: NOERRORS PB E Pad E-15 E-15C V9 11270.05 12600.00 492.05 180.51 311.54 Pass: Major Risk PB E Pad E-28A E-28A V2 10981.16 12618.98 1032.44 225.21 807.23 Pass: Major Risk PB E Pad E-28 E-28 V1 11094.82 12503.98 659.23 218.34 440.89 Pass: Major Risk PB E Pad E-29 E-29 V1 9866.60 10075.00 344.77 236.59 108.18 Pass: Major Risk PB F Pad F-04 F-04A V22 Out of range PB F Pad F-04 F-04APB1 V8 Out of range PB F Pad F-23A F-23A V2 12032.14 11950.00 1029.58 256.40 773.18 Pass: Major Risk PB F Pad F-27 F-27 V1 Out of range PB F Pad F-27 F-27A V2 12953.08 10900.00 561.18 657.48 -96.30 FAIL: Major Risk Site: PB E Pad Well: E-10 Rule As signed: NOERRORS Weppath: E-10 V6 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref . Offset TFO+AZI TF0.HS CasinglHSflistance Area Deviation Wammg ft ft ft ft ft ft deg deg in ft ft ft 9847.96 7646.06 9849.97 7648.10 35.98 36.02 170.49 258.53 9.625 0.33 0.92 -0.59 FAIL 9872.93 7665.62 9874.97 7667.69 35.96 36.11 178.48 265.40 9.625 1.43 1.03 0.39 Pass 9897.88 7685.40 9899.97 7687.32 35.94 36.20 186.69 272.79 9.625 2.73 1.15 1.59 Pass 9922.79 7705.38 9924.97 7706.99 35.92 36.30 193.47 278.71 9.625 4.30 1.28 3.02 Pass 9947.65 7725.53 9949.97 7726.67 35.89 36.39 199.56 283.91 9.625 6.18 1.44 4.74 Pass 9972.45 7745.85 9974.97 7746.39 35.87 36.47 204.53 287.96 9.625 8.36 1.61 6.75 Pass 9997.19 7766.32 9999.97 7766.15 35.85 36.56 208.74 291.21 9.625 10.81 1.78 9.02 Pass 10021.85 7786.92 10024.97 7785.94 35.82 36.65 212.38 293.84 9.625 13.58 1.96 11.62 Pass 10046.42 7807.64 10049.97 7805.74 35.79 36.73 215.60 296.02 9.625 16.70 2.14 14.56 Pass 10071.07 7828.56 10074.97 7825.50 35.78 36.83 218.48 298.50 9.625 20.15 2.23 17.92 Pass 10095.81 7849.59 10099.97 7845.23 35.79 36.94 220.68 300.70 9.625 23.62 2.24 21.37 Pass 10120.56 7870.62 10124.97 7864.97 35.79 37.06 222.39 302.41 9.625 27.05 2.26 24.80 Pass 10145.31 7891.65 10149.97 7884.69 35.79 37.17 223.83 303.85 9.625 30.50 2.27 28.23 Pass 10170.07 7912.68 10174.97 7904.41 35.79 37.29 225.08 305.10 9.625 33.90 2.27 31.62 Pass 10194.84 7933.73 10199.97 7924.12 35.79 37.40 226.20 306.22 9.625 37.24 2.28 34.96 Pass 10219.60 7954.77 10224.97 7943.80 35.80 37.52 227.26 307.28 9.625 40.59 2.29 38.30 Pass 10244.35 7975.80 10249.97 7963.41 35.80 37.63 228.33 308.35 9.625 43.99 2.29 41.70 Pass 10269.10 7996.83 10274.97 7982.94 35.80 37.75 229.38 309.40 9.625 47.45 2.29 45.16 Pass 10293.85 8017.85 10299.97 8002.49 35.81 37.86 230.31 310.33 9.625 50.90 2.30 48.60 Pass 10318.58 8038.87 10324.97 8021.93 35.81 37.98 231.23 311.25 9.625 54.45 2.30 52.15 Pass Page 1 of 2 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Thursday, February 28, 2008 8:39 AM To: 'Nadem, Mehrdad' Cc: Regg, James B (DOA) Subject: RE: E-10B Mehrdad, Thanks for the discussion. On the 7" liner volume, I did not include the amount above the liner top. That does make a difference. On the 7" tieback, it appears there was a typo in the sx count and it should be 842. Nothing further is needed. Regards, Tom Maunder, PE AOGCC >From: Nadem, Mehrdad [mailto:NademM@BP.com] Sent: Thursday, February 28, 2008 7:07 AM To: Maunder, Thomas E {DOA) Cc: Regg, James B (DOA) Subject: RE: E-lOB Tom, Thank you for providing me with an opportunity to revisit my cementing volumes. Below please find my calculation method. I am available to further discuss. Please note my calculations are 2 bbls above what our contractor modeled - I opted to use their value in the application since I put more faith on the computer. I available to further discuss. Tieback Casing, 9-518", 47#, L-80 - ID=8,b81" Tieback, 7", 26#, L-80, ID=6.276" Liner top depth- 9,680' Volume =(((8.681^2 - 7^2))/1029.4) *(9680' - 3,000') =171 bbls We will probably have three bbls left in and around the ES Cementer. 7" Liner 1-Liner length in open hole = (10,818' - 9,830') = 9$8' - 40% excess 2-Liner overlap = 150' - 0 excess 3-80' shoe track 4-200' of 4" drillpipe x 9-5/8" casing 1- (((8.5^2) - (7^2))/1029.4) * 988' * 1.4 = 31.24 bbls 2- (({8.681 ^2 - 7^2))/ i 029.4) *(150') = 3.84 bbls 3- ((6.276^2)/1029.4) * 80 = 3.06 bbls 4- (((8.681^2 - 4^2))/1029.4) *(200') = 11.5 2/28/2008 Page 2 of 2 Total= 49.67 Volume calculation provided by our cementing contractor: 75.8 Tail 47.4 1338.0 9480.0 15.80 k:7.65E-3 tb#.s"nlft2 n:0.8(?4 Ty:3.07 Ibf/900ft2' Best Regards, Mehrdad Nadem Operations Drilling Engineer Phone: 907/564-5941 Celle 907/440-0213 Email: nademm@bp.com From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Wednesday, February 27, 2008 7:21 PM To: Nadem, Mehrdad Cc: lim Regg Subject: E-108 Mehrdad, I am working late trying to get things done be#ore I leave. Would you check your cementing volumes for the 7" liner and tieback? I calculate a little short for the tieback, maybe I am not counting the collars and i am a little long for the liner. Just figuring 8.5 ID with 7" from TD to liner top, I calculate 84% XS. Please copy Jim Regg with your reply. If work needs to be done next week, he will do it. Thanks, Tom Maunder, PE AOGCC 2/28/2008 Alaska Department of Natural Resources Land Administration System Page 1 of . y , ~., .... ~ ~t..- ~ i''-~!°; Recorder`s Spa; ch Sta#e Cabins ~~#t!f"~ 3~AJ1'VL~S ___ _.~_ Alaska ~NR Cass Summary File Type:.. ao~ File Number: 28280 ~ Printable Case File Summary See Township, Range, Section and Acreage? 1 New Search 1 ~` Yes ~ No ___~ ~---_. ___ !_~~ Ndenu ~ Case Abstract I Case Detail i Land Abstract y File: AllL 282ti0 ~~"~'~~~ ~ Search for 'utatus Plat U~~~ates 1; ~~F Obi? %~OOS Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: ~~ OIL & GAS LEASE COMP DNR Zh~it: 780 OIL AND GAS F'ileLocatiorz: DOG DIV OiL AND GAS Case Stators: 35 ISSUED Status Dale: 08/19/1965 Total Acres: 2560.000 Date Initialed: 05/28/1965 Office of Primary Respo~rsibility: DOG DIV OIL AND GAS I crsl Ti°ansaction Date_ 12/04/2006 Case Subtype: ~ NORTH SLOPE Lust Ti•ansaclior~: AA-NRB ASSIGNMENT APPROVED Mer•idiaa~: ~ Township: O11N Rcr~t,~,~: 013E ,S~~ctiur~: Ol ~ti~c~rio~tAcres: 640 ~e"rch Plats 1lr~r~l~li~lic l Tm~>rlship: O1 I N Rcl~r~a: U I31~~, S'eclr~~rr: U~ ,1~>cllnr] 1c~rc~~,~: 6-10 I~J~ricli~r~r: l_' %~~ticne{~rii~: O11N Rcrn~c.~ 0131'; .~'c~~tiuri: II St~c~tron;lcrc~v: 6'10 ll~~~~icliu~~: l '~ 7inr~~shtE~: 01 l N R~rr~;~r.~ O 131: ,~c ~~~iun: I ? S~'c'ur~n ,1c~j•~~s: 6=10 Leal llescription 0~-28-196 * * * S~4LE NOTICE LEGAL DESCRIPTION *'~` C1=F- 91 T11N, R13E, UNI1, 2, 11, 12 2.560.00 U?-07-1987 * * * LISBURIVE PARTICIPATING AREA DESCRIPTION T 11 N. , R.13 E., U. M. ~SEC'TIO~V I: ALL X40 ACRF_5 ,S'EC11O1V 12: ALL 64U AC'IZES http://www. dnr. state. ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber =28280&... 2/27/2008 TRANSMITTAL LETTER CHECKLIST WELL NAME _ ,0 1/ _ • ~Q,~ PTD# m?D~'0.300 / Development Service Exploratory Stratigraphic Test Non-Conventional Well 0~ ~ FIELD: ~'.~Pl/D.~/OE" ~,4Y POOL: _~.~U1~~DE" .BAY fOpL Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two di it i g s n API number permit No. ,API No. 50- - - are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and AP1 number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional Well please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/11/2008 WELL PERMIT CHECKLIST Field & Poot PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT E-106 Program DEV Well bore sag ^ PTD#:2080300 Company BP EXPLORATION (ALASKAI INC Initial ClasslType DEV! P END GeoArea 690 Unit 11650 OnlOff Shore ~__ Annular Disposal ^ Administration 1 Permitfoeattached___-___________________________ ____________NA-_-___- _-- ----------------------------------------- 2 Lease numberaRRropriate--- - - - ----- ----- -- -- - - Yes-- -- - -- - -- -- ---- --- --- - --- ---- --- 3 tlniquewollnameandnumber ---- ------ ----- ----- --- ----- Yea - ---- -- - - -- ---- --- -- -- - --- - -- -- ---- 4 Wfllllcc9tedina_defined_Pool------------------------ -----------Yes------ Prs~dhoQBaYOiIPOoI------------------------- -- --- --- -- 5 _Welt located proper distanoefrom drilling unit-boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ - - _ _ _ - ------------------------------------------ 6 Welt locatedDroperdistancefromotherweils__________________ ____________Yes------ -----_--- ---------------------- -------------------- 7 Suftic~ntacreageayailabloindrillingunit________------ ------ -----Yes------ 2560acros_--__--_______---__--__---.------------- --- _- - 6 If deviated, is_wellbore plat_inciuded - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 AporatoronlyaffectodpaRy-------~- - - - ------- Yes- - -- - -- - -- - -- --- --- ---- -- --- ---- 10 Oparatorbas_appr-opr(atebandlnforce--------------------- -----------Yes------- BlanketBond#6154183-------------------------- - --- - - .-- ---- 11 PermitoanbeissuedwithQUtconservationorder---------------- ------------Yes------- ------------------------ Appr Date 12 PermitcanbotssuedwJthcutadministrative_approval----------- ------------Yea------- ----------------------------------- --- ----------------------------- ACS 212712008 13 CanpormikbaapRrovedboforsl5•dayvYaJl------------------- ------------Yes------ ---------------------------------------- 14 Welllxatedwlthinareaandatrataauthorizedby_InjactionOrder#(putlO# in_commeots)_(Eor--NA______ ___--___-----_----_-_-_--_------------------------- -- - _- 15 All welb_wKhin 114_mtle area of review Idenkified (For service wail only)_ _ _ _ _ _ _ _ _ _ _ _ _ _NA- - - _ - - - - _ _ . - - - - - - _ _ - - - _ - ------------------------------------------------- 16 Pre•produced Injector, duration_of pre production lass than 3 months_ (For servico wolf only) _ _ _NA _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ - _ _ - -------------------------- 17 -Nonoonven,gas_confonns to AS31.05A3Q4.1.A),4.2A•t)j - - - - - - - - - - - - - - - - -NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Conductoratrinl~plQVidDd--------------------------- -------------NA-------- ConduGtorsotinE-10(161-100).--------------------------------------------- 19 SutfacecasingprgtectaallknownU;?RUys------------------- -------------NA-------- Ailac~ifarsaxempted,AEO1.--------------------------------------------- - 20 CMT-volads4uatsaociroulate_onconductor8,surfcsg------------ ----------- NA-------- Surf_acecasingaatinE•10.----.----------------- - -- - - - - ----- 21 CMT.votadequate-totte•inlcngatringtosurfcss~-_.----------- -------------NA-------- Productionoasingaetin_E•1Q--------------------------------------------- 22 CMT_wlllcoverallknawn-produotivabarizons__________________ ____________Yes------- ----------------------------------------------- ----------------- 23 CasingdeslgnsadequateforC,T~6&_permafrost--------------- ------------Yea------ --------------------------------------------- - - -- - ---- 24 Adequate tanka9e_or reserve pit _ _ _ _ _ _ - _ - - _ _ -Yes _ _ _ _ - - Rig equipped with stoel pits, No reserve pit planned._ All waste_to aRR~ved disRosal well(s), - - _ _ - - _ _ _ - - 25 If-a-ro-drill,has-a1a403fQr abandonment been approved__________ ____________Yes_______ 308.047-___-_______-_---__-_.____-____--_- ----_ --------------------- 26 Adequate wehbore separationproposed- - - - - - - - - - - - - _ - _ - _ _ _ _ _ _ _ Yes - _ _ - _ _ I?roximity analysis performed, Cloaa app-roach identfied, F~27-to be gyroed. _ _ _ _ _ _ - - _ - - _ _ - - _ - 27 If-diverterre4uirod, doesikmeetregulations- - - - - - - - - - - - - - - - - - _ _ - _ - NA_ _ _ _ _ _ BQP siack_will already_be in place, - _ - - _ - - --------------------------------------- Appr Date 28 Drilling flwjdprogram achematlc-& aquipliatadoquaks_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ Yes _ _ _ _ _ - _ Maximum oxpeciod formation prossure 6.8-EMW._ MW planned 8.5 ppg in pay zono._ Up to 10.5ppg in6.112" hol- TEM 212712008 29 BOPEa,dotheymeetroguJation__________---_-___-___ ____ --Yea------- .-forshalea._____-___----_----_-_--_---_--.- 30 BOP]:-Press [sting appropriate; test to-(put psig in commonts)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ _ _ _ _ _ -- ------------------- MASP calculated at 2810psi, 3500-paiQOP teat-proposed _ - _ _ _ - - _ - _ _ - - _ - _ _ _ - - _ _ - _ - 31 Choke-manifold ooropliea wlAPIRP-53 (Iu1aY l14)- - - - - -Yea - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - 32 Work willoccutwithoutoporationabutdown___._--__-________ ____________Yes------ --------------------------------------- - - --- ---_ - 33 I& Rresence of H2S gas probable _ _ _ _ _ _ - _ No- _ _ - - - - Minor-H2S_is reported at E Pad, _Mud should-preclude on rig. _Rigbss-sensors-and alarms_ _ _ _ _ _ _ _ _ _ _ _ _ 34 -Mechanical condition of wells within AQR varifiod For sorvico weU only) - - - - - - - _ _ - _ - - NA_ - _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ - - --------------------------------- Geology 35 Permltcan be issued wlc hydrogensuitide moassrres _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ N°- - - - - - - - Max H2S_wfllls F-2TA=1DRpm; F-23A=10_Ppm;E-25=20RRm~ - - - - - - - - - - - - - - - - - - - - . - - - . - - - - - 36 Data.pfesentodonRotentlaloverpressurezones.-___--_____- ------------NA______ ___-- --------------------------------------- Appr Date 37 Seismic analysisafshallowgas_zones_--___--_-_____._ ___. _ - NA_____- ------------------------ _-__-_______-___----_----_--__- ACS 212712008 38 Seabed condJtion aurvey_(if offshore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --_-_--_ ---_ ---__ -_ 39 Contact namolphone for woakly.progress repods_ (exploratory only] - - - -Yes _ _ Mohrdad-Nadom - 584-5941 - - _ _ _ _ _ _ - Geologic Commissioner: Date: Engineering Dete Co missio r, 3~~~ Date r 2 p c~ '~~~4 ~~